Science.gov

Sample records for power administration reporting

  1. Bonneville Power Administration 1998 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1998-01-01

    This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

  2. Southeastern Power Administration 2007 Annual Report

    SciTech Connect

    2007-12-28

    Dear Secretary Chu: I am proud to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2007 Annual Report for your review. The information included in this report reflects Southeastern’s programs, accomplishments, and financial activities for the 12-month period beginning October 1, 2006 and ending September 30, 2007. Southeastern marketed more than 5 billion kilowatt-hours of energy to 492 wholesale Federal power customers in an 11-state marketing area in FY 2007. Revenues from the sale of this power totaled approximately $219 million. Drought conditions continued to plague the southeast region of the United States during 2007 placing strains on our natural and financial resources. Southeastern purchased more than $40 million in replacement power to meet customer contract requirements to ensure the continued reliability of our nation’s power grid. With the financial assistance and support of our Federal power customers, continued funding for capitalized equipment replacements at various Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for aging facilities. Southeastern’s cyber and physical security program continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation standards and requirements. Plans for the upcoming year include communication and cooperation with DOE, Federal power customers, and the Corps to maximize the benefits of our nation’s water resources. Competition for the use of water and the prolonged drought conditions will present another challenging year for our agency. The employees at Southeastern will be proactive in meeting these challenges and providing reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E. Legg Administrator

  3. Southeastern Power Administration 2008 Annual Report

    SciTech Connect

    2008-12-29

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2008 Annual Report for your review. The information included in this document reflects our agency’s programs, accomplishments, operational and financial activities for the 12-month period beginning October 1, 2007 and ending September 30, 2008. Southeastern marketed more than 4.5 billion kilowatt-hours of energy to 491 wholesale customers in ten southeastern states this past year. Revenues from the sale of this power totaled approximately $263 million. Drought conditions persisted in the southeastern region of the United States during FY 2008 placing strains on our natural and financial resources. Power purchases for FY 2008 totaled $91 million. Approximately $44 million of this amount was for replacement power which is paid only during adverse water conditions in order to meet our customers’ contract requirements. With the continued financial assistance and support of our Federal power customers, funding for capitalized equipment purchases and replacements at U.S. Army Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for these aging facilities. Southeastern’s cyber and physical security programs continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation (NERC) standards and requirements. In the coming year, Southeastern will continue open communication and cooperation with DOE, the Federal power customers, and the Corps to maximize the benefits of our region’s water resources. Although competing uses of water and the prolonged drought conditions will present another challenging year for our agency, Southeastern’s employees will meet these challenges and continue to provide reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E.Legg Administrator

  4. Southeastern Power Administration 2012 Annual Report

    SciTech Connect

    2012-01-01

    Dear Secretary Moniz: I am pleased to submit Southeastern Power Administration’s (Southeastern) fiscal year (FY) 2012 Annual Report for your review. This report reflects our agency’s programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2011, and ending September 30, 2012. This past year, Southeastern marketed approximately 5.4 billion kilowatt-hours of energy to 487 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled about $263 million. With the financial assistance and support of Southeastern’s customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corps of Engineers (Corps) continued in FY 2012. Currently, there are more than 214 customers participating in funding infrastructure renewal efforts of powerplants feeding the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems. This funding, which totaled more than $71 million, provided much needed repairs and maintenance for aging projects in Southeastern’s marketing area. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rainfall strained our natural and financial resources. Power purchases for FY 2012 in the Georgia-Alabama-South Carolina System totaled approximately $29 million. About $8 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeastern’s customer contract requirements. Southeastern’s goal is to maximize the benefits of our region’s water resources. Competing uses of these resources will present another challenging year for Southeastern’s employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We

  5. Bonneville Power Administration 1991 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-01-01

    Congress enacted the Bonneville Project Act in 1937, creating the Bonneville Power Administration to market and transmit the power produced by Bonneville Dam on the Columbia River. Since then, Congress has directed BPA to sell at wholesale the power produced at a total of 30 Federal dams in the Pacific Northwest, and to acquire conservation and generating resources sufficient to meet the needs of BPA`s customer utilities. The dams and the electrical system are known as the Federal Columbia River Power System. Bonneville sells wholesale power to public and private utilities, rural cooperatives, large industries, and Federal agencies. BPA also sells or exchanges power with utilities in California. BPA uses revenues from the sale of power and transmission services to recover its own expenses, to repay the Federal investment in the power system, and to pay for the resources it has acquired. BPA pays for operation and maintenance expenses at the Federal dams and at non-Federal power plants. It also pays for irrigation benefits of Federal projects allocated to power to repay, and for fish and wildlife projects which offset damage to these resources by the Federal hydropower system. This document is the 1991 statement of budget, financial statement, cash flows, capitalization, expenses, and projects. An organization chart is included.

  6. Bonneville Power Administration 1997 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1998-01-01

    The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

  7. Southwestern Power Administration Annual Report 2011

    SciTech Connect

    2013-04-01

    Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2011. In FY 2011, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $167 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  8. Southwestern Power Administration Annual Report 2012

    SciTech Connect

    2013-09-01

    Dear Secretary Moniz: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2012. In FY 2012, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $195 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  9. Southwestern Power Administration Annual Report 2010

    SciTech Connect

    2012-09-01

    Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2010. In FY 2010, Southwestern delivered nearly 7.6 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Texas, and Oklahoma, generating $189 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  10. Southwestern Power Administration Annual Report 2008

    SciTech Connect

    2010-12-01

    Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers – nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwestern’s safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

  11. Southwestern Power Administration Annual Report 2007

    SciTech Connect

    2008-01-01

    “Renewable energy” isn’t just a catchphrase at Southwestern Power Administration (Southwestern). It describes the hydroelectric energy we market, and the energy that Southwestern’s employees bring to work every day, constantly challenging themselves to become more eff ective and effi cient in providing aff ordable, environmentally clean power to the American people. As Southwestern’s new Administrator, I have had the opportunity to view our operations from a fresh perspective, and I’m proud to share with you how a focus on continual improvement has been evident in accomplishments throughout the agency during fi scal year (FY) 2007. When the North American Electric Reliability Corporation (NERC) implemented new reliability standards, we met applicable implementation dates and exceeded NERC’s control performance standards throughout the year. When tasked with reducing the agency’s carbon footprint, we found ways to achieve an 8.7% reduction in energy intensity from last year without impacting our operational capabilities. And when faced with record-breaking infl ows into the reservoir projects from which we market power, we capitalized on the opportunity to provide customers with signifi cant quantities of supplemental energy. Our supplemental sales this year not only saved customers over $122 million, but increased Southwestern’s revenues -- a huge win-win for Southwestern’s ratepayers and the Nation’s taxpayers alike. Southwestern is proud of its role in protecting National and economic security by contributing to the diverse supply of domestically produced energy, operating and maintaining a safe and reliable transmission system, and ensuring good stewardship of our Nation’s water resources and environment. In FY 2007, Southwestern continued to repay all power costs to the American taxpayers by marketing and delivering approximately 5.6 billion kilowatthours of hydropower at cost-based rates to customers in our six-state region. This energy

  12. Southeastern Power Administration 2011 Annual Report

    SciTech Connect

    2011-12-31

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern) fiscal year (FY) 2011 Annual Report for your review. This report reflects our agency’s programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2010, and ending September 31, 2011. This past year, Southeastern marketed approximately 6.2 billion kilowatt-hours of energy to 489 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled more than $264 million. With the financial assistance and support of Southeastern’s customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corps of Engineers (Corps) continued in FY 2011. This funding, which totaled more than $45 million, provided much needed repairs and maintenance for aging projects in Southeastern’s marketing area. Currently, there are more than 214 customers participating in the funding efforts in the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems of projects. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rain placed strains on our natural and financial resources. Power purchases for FY 2011 totaled approximately $38 million. About $9 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeastern’s customer contract requirements. Southeastern’s goal is to maximize the benefits of our region’s water resources. Competing uses of these resources will present another challenging year for Southeastern’s employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We are committed to providing reliable hydroelectric power to

  13. Bonneville Power Administration 1991 site environmental report

    SciTech Connect

    Not Available

    1992-06-01

    In 1991, in order to provide BPA's management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA's findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  14. Bonneville Power Administration Site Environmental Report, 1991.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-06-01

    In 1991, in order to provide BPA`s management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA`s findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  15. Southwestern Power Administration 1993 annual report

    SciTech Connect

    Not Available

    1993-12-31

    This booklet is divided into an overview (mission statement, map, performance, etc.), the year in review, financial and statistical report, financial and statistical report, financial and statistical data, and SPA organization.

  16. 2012 Annual Report [WESTERN AREA POWER ADMINISTRATION

    SciTech Connect

    2012-01-01

    Fiscal Year 2012 brought some tumultuous and uncertain times to Western. The utility industry and technology continued to evolve, and the demand for constant flow of power and transmission system reliability continued to increase. Western kept pace by continuing to deliver reliable, cost-based hydropower while reviewing and updating business practices that took into account how the energy industry is evolving. During this time of exponential change, Western tackled many challenges, including: Reviewing the Transmission Infrastructure Program processes and procedures; Responding to Secretary of Energy Steven Chu’s memorandum to create a modern, efficient and reliable transmission grid; Weathering record-breaking natural disasters in our service territory; Completing our role in TIP’s flagship project—the Montana Alberta Tie Ltd. transmission line; Incorporating new, far-reaching regulations and industry trends.

  17. 2011 Annual Report [WESTERN AREA POWER ADMINISTRATION

    SciTech Connect

    2011-01-01

    Western’s achievements for 2011 are reported and include: Experienced a banner water year – meaning more hydropower delivered; Changed energy scheduling— to better support intermittent renewable resources; Maintained reliability— ensuring maximum use of the grid by reducing the frequency and duration of planned and unplanned outages; Connected communities— providing customers energy products and related services at cost-based rates; Managed transmission projects.

  18. The energy behind the power. Southwestern Power Administration 1994 annual report

    SciTech Connect

    1994-12-31

    This is the Southwestern Power Administration 1994 annual report. The topics of the report include a letter to the secretary; an overview including the mission statement, a description of the Southwestern Federal Power System, financial statement, performance measurements, national performance review; year in review, summary of results, financial and statistical data and the Southwestern Power Administration Organization.

  19. Southwestern Power Administration annual site environmental report CY 1997

    SciTech Connect

    1998-11-01

    This report provides a synopsis of Southwestern Power Administration`s (Southwestern`s) effectiveness in managing its operations in an environmentally responsible manner. In CY 1997, the Office of Environmental, Safety, and Health was reorganized and incorporated into the Division of Acquisition and Property. The Division of Acquisition, Property, and Environmental Management maintains responsibility for development, oversight, and implementation of environmental programs. Senior Management at Southwestern has taken actions to increase environmental awareness throughout the organization. During CY 1997, (Southwestern) was not involved in any known programs or activities that had adverse impacts on the environment. The 1997 Environmental Appraisal, a portion of Southwestern`s Self-Assessment and Appraisal Program, indicated approximately 90% compliance with Southwestern`s written environmental programs. Southwestern continued to function throughout CY 1997 in an operations and maintenance posture with minor substation projects.

  20. Alaska Power Administration federal power program, Juneau, Alaska. [Fiscal Year 1991 (With Independent Auditors' Report Thereon)

    SciTech Connect

    Not Available

    1992-06-30

    This report presents the results of the independent certified public accountants' audit of the Department of Energy's Alaska Power Administration (APA) financial statements as of September 30, 1991. In their opinion, the APA statements are fairly presented in all material respects in accordance with generally accepted accounting principles except as described in their report. Their reports on the APA internal control structure and on its compliance with laws and regulations are also provided. The US Government, through the Department of Energy operates APA at two sites to provide hydroelectric power to Juneau and Anchorage, Alaska.

  1. Seven Global Goals. 2013 annual report, Southwestern Power Administration

    SciTech Connect

    none,

    2014-09-01

    For over 70 years, Southwestern has marketed and delivered reliable, renewable, and affordable hydropower, partnering with Federal power stakeholders and others in the industry to make sure the lights stay on. This kind of effective, efficient, and cost conscious operation is made possible only by hard work and dedication. Southwestern employees work individually and as a team to meet seven comprehensive agency goals that touch on all aspects of the agency’s operations. Dubbed the “Seven Global Goals” by Administrator Chris Turner, these objectives identify specific, measurable targets that support Southwestern’s mission and reinforce its responsibilities toward its customers and the Nation.

  2. 2014 annual site environmental report, Southwestern Power Administration

    SciTech Connect

    none,

    2014-12-31

    Southwestern Power Administration’s Annual Site Environmental Report (ASER) serves as the chief reporting mechanism for site environmental performance information within the Department of Energy and as a valuable resource for shared and collaborative environmental protection and performance information to Agency stakeholders and members of the public living near Southwestern Power Administration’s (Southwestern) facilities and transmission line rights-of-ways. This ASER meets the requirements of Department of Energy (DOE) Order 231.B. Southwestern’s key environmental involvement includes an emphasis on the protection of ecological resources which is effectively accomplished through environmental program elements such as protecting water resources, generation of clean hydropower energy, oil spill prevention practices, elimination of green-house gas emissions, and comprehensive project reviews to ensure the protection of living organisms, migratory birds, Federally threatened or endangered species, and historic or cultural resources. Southwestern continues to actively minimize effects to natural resources and strive for continual improvement in the area of environmental compliance and sustainability while achieving the agency mission to market and deliver Federal hydroelectric power.

  3. Southwestern Power Administration Annual Report 2004-2006

    SciTech Connect

    2006-01-01

    Confidence Commitment Cooperation These are words that spring to mind regarding Southwestern Power Administration’s performance during fiscal years (FY) 2004-2006 By offering innovative, customer-oriented service, working to improve system reliability and efficiency, and partnering with customers and other Federal power stakeholders, Southwestern has certainly exhibited all three of these qualities during these challenging yet productive years In fact, our cooperative working relationships were critical to our success during the severe and widespread drought conditions which prevailed throughout Southwestern’s marketing area for much of 2005-2006 When we proposed a temporary energy deferral program, our customers came on board by voluntarily taking less Federal hydropower than they were entitled to, enabling us to preserve system storage and fulfill our contract obligations during the crucial summer months of 2006 The U S Army Corps of Engineers (Corps) also helped improve our drought situation by allowing Southwestern more operational flexibility on a regional level Despite the challenges this critical drought period presented, Southwestern remained committed to fulfilling our mission and strategic goals From FY 2004 through FY 2006, we marketed and delivered all available Federal hydropower while meeting and even exceeding the reliability standards of the North American Electric Reliability Corporation (NERC) Our Power Operations Training Center in Springfield, Missouri, was cited as an “Example of Excellence” during a NERC readiness audit in October 2006; and as we have every year since NERC began measuring, Southwestern far exceeded the accepted NERC compliance ratings for power system operations reliability Our commitment to excellence and accountability has kept our repayment goals on target as well Revenues were sufficient to repay all annual expenses and the required principal investment in the Federal hydropower facilities Furthermore, the original

  4. Report on audit of Bonneville Power Administration`s energy resource programs

    SciTech Connect

    1995-09-08

    The Bonneville Power Administration (Bonneville) must ensure that the costs of its contracts for energy resources are as low as reasonably possible and that the resources are needed. During the audit, we reviewed Bonneville`s energy resource programs and focused on its purchase of electrical output from natural gas fired combustion turbines. The objective of this audit was to determine if Bonneville paid excessive costs to acquire the electrical output from combustion turbine facilities. The audit showed that Bonneville contracted to purchase the output from a combustion turbine facility at excessive cost, and that the electricity was not needed. The cost of the electricity under this contract exceeded the amount of revenue Bonneville could obtain by selling it. Bonneville estimated it would operate the generation facility for only 6 months of the year; the contract, however, required Bonneville to pay the fixed costs of the facility during the other 6 months. Consequently, the cost of the electricity plus the fixed costs in the first year of the contract would exceed revenues by $20.9 million. The contract also contained cost escalators that exceeded the rate of inflation. These cost escalators combined with the excessive initial cost resulted in projected excessive costs of $146.8 million in the first 5 years of the contract, Finally, the contract was not needed due to competition from similar facilities and a desire by customers to diversify their sources of electricity.

  5. Alaska Power Administration combined financial statements, schedules and supplemental reports, September 30, 1995 and 1994

    SciTech Connect

    1995-12-31

    This report presents the results of the independent certified public accountant`s audit of the Department of Energy`s Alaska Power Administration`s (Alaska) financial statements as of September 30, 1995. The auditors have expressed an unqualified opinion on the 1995 statements. Their reports on Alaska`s internal control structure and on compliance with laws and regulations are also provided. The Alaska Power Administration operates and maintains two hydroelectric projects that include five generator units, three power tunnels and penstocks, and over 88 miles of transmission line. Additional information about Alaska Power Administration is provided in the notes to the financial statements. The 1995 financial statement audit was made under the provisions of the Inspector General Act (5 U.S.C. App.), as amended, the Chief Financial Officers (CFO) Act (31 U.S.C. 1500), and Office of Management and Budget implementing guidance to the CFO Act. The auditor`s work was conducted in accordance with generally accepted government auditing standards. To fulfill the audit responsibilities, the authors contracted with the independent public accounting firm of KPMG Peat Marwick (KPMG) to conduct the audit for us, subject to review. The auditor`s report on Alaska`s internal control structure disclosed no reportable conditions that could have a material effect on the financial statements. The auditor also considered the overview and performance measure data for completeness and material consistency with the basic financial statements, as noted in the internal control report. The auditor`s report on compliance with laws and regulations disclosed no instances of noncompliance by Alaska.

  6. Alaska Power Administration combined financial statements, schedules and supplemental reports, September 30, 1996 and 1995

    SciTech Connect

    1997-04-01

    This report presents the results of the independent certified public accountants` audit of the Department of Energy`s Alaska Power Administration`s (Alaska) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 combined statements of assets, Federal investment and liabilities, and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows. The auditors` report on Alaska`s internal control structure disclosed no reportable conditions that could have a material effect on the financial statements. The auditors also considered the overview and performance measure data for completeness and material consistency with the basic financial statements, as noted in the internal control report. The auditor`s report on compliance with laws and regulations disclosed no instances of noncompliance by Alaska.

  7. The Administrative Power Grab

    ERIC Educational Resources Information Center

    Sorenson, Richard D.

    2007-01-01

    Administrative power for some school teachers can be an aphrodisiac that can be applied negatively, especially when a leader has devastating instinct for the weaknesses of others. A leader's intellect and heart closes shop and ceases to function when drunk on power. In this article, the author describes how the use of administrative power can be…

  8. The Administrative Power Grab

    ERIC Educational Resources Information Center

    Sorenson, Richard D.

    2007-01-01

    Administrative power for some school teachers can be an aphrodisiac that can be applied negatively, especially when a leader has devastating instinct for the weaknesses of others. A leader's intellect and heart closes shop and ceases to function when drunk on power. In this article, the author describes how the use of administrative power can be…

  9. Western Area Power Administration. [Combined Power System Financial Statements and Supplemental Schedules. September 30, 1991. (With Independent Auditor's Report Thereon)

    SciTech Connect

    Not Available

    1991-09-30

    This report presents the results of the independent certified public accountants' audit of the Department of Energy's Western Area Power Administration (Western) financial statements as of September 30, 1991. In their opinion, Western's statements are fairly presented in all material respects in accordance with generally accepted accounting principles. Their reports on Western's internal control structure and its compliance with laws and regulations, as well as a management letter addressing needed improvements are also provided. Western was established in December 1977, and has the responsibility for the Federal electric power marketing and transmission functions in 15 central and western states. Western markets power, as required by existing law, at the lowest possible rates consistent with sound business principles to recover the costs of operation and capital invested in power facilities.

  10. Early utility experience with wind power generation. Volume 3: Bonneville Power Administration Goodnoe Hills Project. Final report

    SciTech Connect

    McCabe, T.; Henry, G.; Tennis, M.; Goldenblatt, M.

    1984-01-01

    This report is one of three presenting the results of EPRI Research Project 1590-1, Evaluation of Electric Utility Experience with Wind Power Generation. The objective of this project was to develop an improved understanding of wind power generation, in particular the process a utility must undergo to initiate and carry out a wind turbine project. The primary tasks of RP1590-1 were to document and evaluate the experience of two utilities with megawatt-scale wind turbine installations from project inception to the wind turbine's first rotation. This technical report presents the experiences of the Bonneville Power Administration (BPA) as the participating utility in the MOD-2 cluster field test program. Under this program the National Aeronautics and Space Administration (NASA) as management agent for the US Department of Energy, has installed three MOD-2 wind turbines at Bonneville's Goodnoe Hills site. All documents and reports pertaining to BPA's experience with wind energy at Goodnoe Hills were reviewed and excerpts made of the highlights. Gaps in the documentation were filled by talking with the appropriate people. Site visits were conducted to monitor current activity. The information obtained was evaluated for its generic relevance and benefit to other utilities. The chronology of the steps taken in implementing the wind turbine project and some of the lessons learned are included in the report. In each section, important activities, critical assumptions, and interesting insights which might benefit other utility wind programs are identified.

  11. Alaska Power Administration combined financial statements, schedules, and supplemental reports, September 30, 1997 and 1996 with independent auditors` report thereon

    SciTech Connect

    1998-04-01

    The Alaska Power Administration (APA) will continue to encourage economic and industrial development in Alaska through implementing the sale of APA assets in a manner consistent with the authorizing legislation while balancing all the stakeholders` interests. Alaska Power Administration will provide their employees opportunities for successful career transitions and conduct an efficient transfer of assets and closeout of APA, while continuing to provide customers reliable, low-cost hydroelectric energy during the transition. The attached report presents the results of the independent certified public accounts` audit of the Alaska Power Administration`s (APA) combined power system statements of assets; Federal investment and liabilities; and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows. The auditors` reports on APA`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance. Based on the unqualified opinion of the independent public accounting firm of KPMG Peak Marwick LLP and review of their audit work, the authors believe the financial statements fairly present the financial condition and results of the operations of APA for the period under audit.

  12. Western Area Power Administration combined power system financial statements, September 30, 1996 and 1995 (with independent auditors` report thereon)

    SciTech Connect

    1997-04-01

    This report presents the results of the independent certified public accountants` audit of the Department of Energy`s Western Area Power Administration`s (Western) combined financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statements. The auditors` report on Western`s internal control structure disclosed two new reportable conditions and discussed the status of an unresolved condition from prior years. The new conditions involved the write-off of aging accounts receivable and the understatement of interest expense for inactive construction work orders. These reportable conditions are not considered to be material weaknesses. Western concurred with the audit recommendations and is responsible for necessary corrective actions. The auditors also considered the overview and performance measure data for completeness and material consistency with the basic financial statements as noted in the internal control report. The report also disclosed an additional reportable condition directed to the Bureau of Reclamation (Reclamation) which is not considered to be a material weakness. Reclamation concurred with the audit recommendation and is responsible for necessary corrective action. The auditors` report on Western`s compliance with laws and regulations disclosed two new instances of noncompliance involving interest charges on all construction costs funded with Federal appropriations and other capitalized costs. The report also discussed the status of one instance of noncompliance from prior years. Western provided concurrence and corrective action plans for all of these instances of noncompliance.

  13. Income distribution impacts of changes in Western Area Power Administration electricity prices. Final report

    SciTech Connect

    Rose, A.; Frias, O.

    1993-06-01

    The purpose of this report is to present the methodology and results of an analysis of income distribution impacts associated with changes in the Western Area Power Administration (WAPA) marketing program. The focus will be on the distribution of personal income across eleven brackets in each of nine sub-regions of the WAPA market area. Moreover, these results will be translated into an assessment of the number of people who stand to gain or lose as a result of the policies and the size of these income changes. Most economic impact analyses are performed at an aggregate level. The results are typically presented in terms of net benefits, or a listing of changes in employment, output, income, or prices. What is neglected is the distribution of impacts across the affected population. These distributional impacts are important for several reasons. First, there is the normative judgmental issue of distributional justice, or equity. This addresses concerns about income disparities in general, or whether the poor, or any other group, are shouldering a disproportionate share of any burden or are failing to share significantly in any gain.

  14. Western Area Power Administration annual site environmental report for calendar year 2005

    SciTech Connect

    2005-12-31

    This document outlines the accomplishments and status of the environmental program of the Western Area Power Administration (Western) for calendar year 2005. In 2005, Western submitted 190 reports to state and local emergency response personnel and had 60 California Hazardous Materials Business Plans in place as required under the Emergency Planning and Community Right-to-Know Act. These reports identify the hazardous substances contained at these sites. At sites where potential oil spills could harm surrounding ecosystems and waterways, Western prepares Spill Prevention, Control, and Countermeasure (SPCC) plans. These plans identify measures to prevent spills from harming the environment, such as identifying the need for secondary containment at facilities. Western currently has SPCC plans for 154 facilities in 13 states. In 2005, Western updated 19 SPCC plans and prepared one new plan. Western operated under 107 environmental permits in 2005. Western evaluates the impact of its planned actions on the environment by preparing National Environmental Policy Act documentation. In 2005, Western completed or was working on 60 categorical exclusions, 18 environmental assessments and eight environmental impact statements, issued six Findings of No Significant Impact, and prepared four Mitigation Action Plans. Western held several public workshops/meetings and consulted with 70 American Indian Tribes for various projects. In 2005, Western was working on or had completed 11 Section 7 consultations under the Endangered Species Act. In 2005, Western recycled more than 3,600 metric tons of electrical equipment, mineral oil dielectric fluid, asphalt, fluorescent and metal halide light bulbs, wood poles and crossarms, and other items as well as office waste. Western made $437,816 worth of purchases containing recovered content materials. Western met the requirement of Executive Order 13148, Greening the Government through Leadership in Environmental Management to have its

  15. Office of Inspector General report on audit of the Western Area Power Administration`s contract with Basin Electric Power Cooperative

    SciTech Connect

    1997-06-25

    At the request of the Western Area Power Administration (Western), an audit of 17 areas was conducted with respect to possible overcharges on a power contract between Western and Basin Electric Power Cooperative (Basin), Contract No. DE-MP65-82WP-19001. The contract for Western`s purchase of electric power from Basin was entered into on April 15, 1982, and was in effect from January 1, 1986, through October 31, 1990. During this 58-month period, Basin billed Western approximately $197.6 million. Overall, it was found that Basin overcharged Western approximately $23.8 million. These overcharges occurred because Basin: (1) did not recognize or amortize as gain its overestimate of completion and correction costs for Antelope Valley Station (AVS) Unit 2; (2) did not amortize the gain on the sale/leaseback of AVS Unit 2 as an offset to lease costs; (3) billed Western prematurely for lease and interest costs; (4) overcharged for the cost of coal by including administrative and general expenses and profit, as well as incorrectly calculating discounts, royalty payments, and imputed interest costs; (5) made faulty calculations of amortization rates for deferred costs; (6) used a shorter depreciation period for AVS common facilities than it had used for other power plants; (7) retained tax benefit transfers; and (8) charged Western for interest and depreciation that had been paid by others. In addition to the $23.8 million in overcharges, interest accrued on the overcharges through December 31, 1996 was estimated to be approximately $22.1 million, resulting in a total of $45.9 million due Western.

  16. Alaska Power Administration federal power program financial statements with supplementary information September 30, 1993 and September 30, 1992 with auditors` reports thereon

    SciTech Connect

    Not Available

    1994-02-14

    The mission of the Alaska Power Administration is to operate and maintain Alaska`s Federal hydroelectric generation and transmission facilities in an efficient, reliable, safe, and environmentally sensitive manner. The power from the facilities is marketed in a manner so as to repay their federal debt and provide widespread use of the power resources at the lowest cost to consumers consistent with sound business principles. This document presents fiscal 1993 accomplishments, future plans, results of operations, sales and revenues, expenses, debt service, repayment status, net cash flow, system reliability, and a report of independent accountants.

  17. Operational Impacts of Wind Energy Resources in the Bonneville Power Administration Control Area - Phase I Report

    SciTech Connect

    Makarov, Yuri V.; Lu, Shuai

    2008-07-15

    This report presents a methodology developed to study the future impact of wind on BPA power system load following and regulation requirements. The methodology uses historical data and stochastic processes to simulate the load balancing processes in the BPA power system, by mimicking the actual power system operations. Therefore, the results are close to reality, yet the study based on this methodology is convenient to conduct. Compared with the proposed methodology, existing methodologies for doing similar analysis include dispatch model simulation and standard deviation evaluation on load and wind data. Dispatch model simulation is constrained by the design of the dispatch program, and standard deviation evaluation is artificial in separating the load following and regulation requirements, both of which usually do not reflect actual operational practice. The methodology used in this study provides not only capacity requirement information, it also analyzes the ramp rate requirements for system load following and regulation processes. The ramp rate data can be used to evaluate generator response/maneuverability requirements, which is another necessary capability of the generation fleet for the smooth integration of wind energy. The study results are presented in an innovative way such that the increased generation capacity or ramp requirements are compared for two different years, across 24 hours a day. Therefore, the impact of different levels of wind energy on generation requirements at different times can be easily visualized.

  18. Bonneville, Power Administration Timing System

    NASA Technical Reports Server (NTRS)

    Martin, Kenneth E.

    1996-01-01

    Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.

  19. Idaho Model Watershed Project : Annual Report to the Bonneville Power Administration January 1, 1997 - December 31, 1997.

    SciTech Connect

    Bradbury, Allen; Slavin, Katie

    1998-10-28

    The Model Watershed Project was initiated in the fall of 1992 with a grant from Bonneville Power Administration. The objective of this project is to protect, enhance and restore anadromous and resident fish habitat and achieve and maintain a balance between resource protection and resource use on a holistic watershed basis.

  20. Longitudinal load and cascading failure risk assessment (CASE): Bonneville Power Administration`s 230/500-kV Longview-Olympia transmission line. Final report

    SciTech Connect

    Ostendorp, M.

    1998-12-01

    The Electric Power Research Institute`s (EPRI) Cascading Failure Risk Assessment (CASE) methodology was used to determine extreme event, unbalanced loads on Bonneville Power Administration`s (BPA) 230/500-kV, single circuit, Longview-Olympia transmission line and to identify the cascading potential of the line under five different loading conditions. More specifically, BPA wanted to evaluate the cascading potential of the Type 2L, Type 2A1, and Type 238M tangent structures which comprise a significant portion of the line. While other cascading assessment methods primarily focus on the magnitude of the unbalanced loads acting on the first structure from the initiating event, EPRI`s CASE method incorporates the dynamic response and damping characteristics of the transmission line to determine the unbalanced longitudinal loads at any structure away from the initiating failure event. The CASE application constituted an investigation into the nature of the extreme loads that are expected to occur on the 230/500-kV Longview-Olympia transmission line during a cascading failure and the corresponding dynamic response. The goals of the investigation were: to quantify unbalanced longitudinal loads acting on structures adjacent to the broken insulator, shield wire, or conductor failure as well as down-line structures; and to assess the cascading potential of the Longview-Olympia transmission line by considering the energy dissipation at successive spans and supports. The results of the CASE method showed that BPA`s longitudinal loading criteria for the Type 2L, 2A1, and 238 M lattice towers satisfy BPA`s containment failure design philosophy with the addition of fiber optic cable. BPA`s longitudinal loading criteria applied simultaneously with extreme ice or wind does not provide adequate strength to prevent a cascade of less than ten towers.

  1. Western Area Power Administration. Combined power system financial statements

    SciTech Connect

    1998-02-26

    This report presents the results of the independent certified public accountants` audit of the Western Area Power Administration`s combined power system statements of assets, Federal investment and liabilities, and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows. The auditors` report on Westerns internal control structure disclosed three new reportable conditions concerning the lack of: (1) a reconciliation of stores inventory from subsidiary ledgers to summary financial information, (2) communication of interest during construction and related adjustments to interest on Federal investment, and (3) a system to prevent and detect power billing errors. None of the conditions were considered to be material weaknesses. Western provided concurrence and corrective action plans. The auditors` report on Western`s compliance with laws and regulations also disclosed two new instances of noncompliance. Western failed to calculate nonreimbursable expenses in accordance with the Grand Canyon Protection Act and had an unexplained difference in gross Federal investment balances used to calculate interest on Federal investment. Western provided concurrence and corrective action plans for the instances.

  2. Impacts of Western Area Power Administration`s power marketing alternatives on air quality and noise

    SciTech Connect

    Chun, K.C.; Chang, Y.S.; Rabchuk, J.A.

    1995-05-01

    The Western Area Power Administration, which is responsible for marketing electricity produced at the hydroelectric power-generating facilities operated by the Bureau of Reclamation on the Upper Colorado River, has proposed changes in the levels of its commitment (sales) of long-term firm capacity and energy to its customers. This report describes (1) the existing conditions of air resources (climate and meteorology, ambient air quality, and acoustic environment) of the region potentially affected by the proposed action and (2) the methodology used and the results of analyses conducted to assess the potential impacts on air resources of the proposed action and the commitment-level alternatives. Analyses were performed for the potential impacts of both commitment-level alternatives and supply options, which include combinations of electric power purchases and different operational scenarios of the hydroelectric power-generating facilities.

  3. Environmental Assessment for power marketing policy for Southwestern Power Administration

    SciTech Connect

    Not Available

    1993-12-01

    Southwestern Power Administration (Southwestern) needs to renew expiring power sales contracts with new term (10 year) sales contracts. The existing contracts have been in place for several years and many will expire over the next ten years. Southwestern completed an Environmental Assessment on the existing power allocation in June, 1979 (a copy of the EA is attached), and there are no proposed additions of any major new generation resources, service to discrete major new loads, or major changes in operating parameters, beyond those included in the existing power allocation. Impacts from a no action plan, proposed alternative, and market power for less than 10 years are described.

  4. Southwestern Power Administration site environmental report: Tulsa, Oklahoma, Williams Center Tower I, January 1, 1995--December 31, 1995

    SciTech Connect

    1995-12-31

    During CY 1995, Southwestern was not involved in any programs that had a direct effect on the environment, involving endangered species, protection of wetlands, or increased electromagnetic radiation. Southwestern continued to function throughout the year in an operations and maintenance posture with minor substation projects. Southwestern received two DOE audits, March 1991 and 1993. Southwestern has worked diligently on the DOE approved action plan and has completed the required report. The audits provided the Secretary, DOE Headquarters, and Southwestern an indication of the status of Southwestern management`s effectiveness in discharging its duties in an environmental responsible manner. Senior management at Southwestern has taken actions to increase environmental awareness throughout the organizations which is evidenced by the creation of the Environmental, Safety, Health, and Security Office, and the establishment of environmental and safety appointed representatives at various field locations.

  5. Nurse Administrators’ Perceptions of Power.

    DTIC Science & Technology

    1989-01-01

    PiCr1i, w’~nQpth Nl nay srd T1 i o TT.T York- Viking Press Le~ess 1 - .192) Effective managvement: Social Prenti~ce-Hal1l Leininge .!.. 92) The leaership...department. Recognition of nurses’ rights to power is abundant in the literature (Ashley, 1973, 1975; Leininger , 1974, 1977; McFarland & Shiflett, 1979...impotence. Leininger (1974) asserted that the modern nurse administrator must consider power because power is necessary to effective management. Leininger

  6. 76 FR 49763 - Bonneville Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Bonneville Power Administration; Notice of Filing Take notice that on August 1, 2011, the Bonneville Power Administration submitted its Proposed 2012 Wholesale Power...

  7. 75 FR 62530 - Southeastern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southeastern Power Administration; Notice of Filing October 1, 2010. Take.... and Replacement-2-A for the sale of power from Southeastern Power Administration's...

  8. Western Area Power Administration combined power system financial statements, 30 September 1995 and 1994

    SciTech Connect

    1995-12-31

    The attached report presents the results of the independent certified public accountant`s audit of the Department of Energy`s Western Area Power Administration`s (Western) combined financial statements as of September 30, 1995. The auditors have expressed an unqualified opinion on Western`s 1995 statements. Their reports on Western`s internal control structure and on compliance with laws and regulations are also provided.

  9. 75 FR 67960 - Southeastern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ...] Southeastern Power Administration; Notice of Filing October 28, 2010. Take notice that on October 6, 2010, the Southeastern Power Administration, pursuant to Order No. 714,\\1\\ submitted its Baseline Filing, to be effective...

  10. 26 CFR 1.675-1 - Administrative powers.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 8 2010-04-01 2010-04-01 false Administrative powers. 1.675-1 Section 1.675-1...) INCOME TAXES Grantors and Others Treated As Substantial Owners § 1.675-1 Administrative powers. (a... the trust. If a grantor retains a power to amend the administrative provisions of a trust...

  11. Annual Report to the Bonneville Power Administration, Reporting Period: April 2008 - February 2009 [re: "Survival and Growth in the Columbia River Plume and north California Current"].

    SciTech Connect

    Northwest Fisheries Science Center, NOAA Fisheries; Cooperative Institute for Marine Resources Studies, Oregon State University; OGI School of Science & Engineering, Oregon Health Sciences University.

    2009-07-17

    We have made substantial progress toward our objectives outlined in our BPA supported proposal entitled 'Columbia River Basin Juvenile Salmonids: Survival and Growth in the Columbia River Plume and northern California Current' which we report on herein. During 2008, we were able to successfully conduct 3 mesoscale cruises. We also were able to conduct 7 biweekly predator cruises, along with substantial shore-based visual observations of seabirds. Detailed results of the mesoscale cruises are available in the Cruise Reports and summarized in the next section. We have taken a proactive approach to getting the results of our research to fisheries managers and the general public. We have begun to make annual predictions based on ocean conditions of the relative survival of juvenile coho and Chinook salmon well before they return as adults. This is based on both biological and physical indicators that we measure during our surveys or collect from outside data sources. Examples of our predictions for 2009 and 2010 are available on the following web site: http://www.nwfsc.noaa.gov/research/divisions/fed/oeip/a-ecinhome.cfm.

  12. Impacts of Western Area Power Administration`s power marketing alternatives on electric utility systems

    SciTech Connect

    Veselka, T.D.; Portante, E.C.; Koritarov, V.

    1995-03-01

    This technical memorandum estimates the effects of alternative contractual commitments that may be initiated by the Western Area Power Administration`s Salt Lake City Area Office. It also studies hydropower operational restrictions at the Salt Lake City Area Integrated Projects in combination with these alternatives. Power marketing and hydropower operational effects are estimated in support of Western`s Electric Power Marketing Environmental Impact Statement (EIS). Electricity production and capacity expansion for utility systems that will be directly affected by alternatives specified in the EIS are simulated. Cost estimates are presented by utility type and for various activities such as capacity expansion, generation, long-term firm purchases and sales, fixed operation and maintenance expenses, and spot market activities. Operational changes at hydropower facilities are also investigated.

  13. Using Ensemble Streamflows for Power Marketing at Bonneville Power Administration

    NASA Astrophysics Data System (ADS)

    Barton, S. B.; Koski, P.

    2014-12-01

    Bonneville Power Administration (BPA) is a federal non-profit agency within the Pacific Northwest responsible for marketing the power generated from 31 federal hydro projects throughout the Columbia River Basin. The basin encompasses parts of five states and portions of British Columbia, Canada. BPA works with provincial entities, federal and state agencies, and tribal members to manage the water resources for a variety of purposes including flood risk management, power generation, fisheries, irrigation, recreation, and navigation. This basin is subject to significant hydrologic variability in terms of seasonal volume and runoff shape from year to year which presents new water management challenges each year. The power generation planning group at BPA includes a team of meteorologists and hydrologists responsible for preparing both short-term (up to three weeks) and mid-term (up to 18 months) weather and streamflow forecasts including ensemble streamflow data. Analysts within the mid-term planning group are responsible for running several different hydrologic models used for planning studies. These models rely on these streamflow ensembles as a primary input. The planning studies are run bi-weekly to help determine the amount of energy available, or energy inventory, for forward marketing (selling or purchasing energy up to a year in advance). These studies are run with the objective of meeting the numerous multi-purpose objectives of the basin under the various streamflow conditions within the ensemble set. In addition to ensemble streamflows, an ensemble of seasonal volume forecasts is also provided for the various water conditions in order to set numerous constraints on the system. After meeting all the various requirements of the system, a probabilistic energy inventory is calculated and used for marketing purposes.

  14. 43 CFR 4.1121 - Powers of administrative law judges.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Powers of administrative law judges. 4... Evidentiary Hearings § 4.1121 Powers of administrative law judges. (a) Under the regulations of this part, an administrative law judge may— (1) Administer oaths and affirmations; (2) Issue subpoenas; (3) Issue...

  15. 75 FR 65624 - Southeastern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southeastern Power Administration; Notice of Filing October 19, 2010. Take... Southeastern Power Administration (Southeastern) Rate Order No. SEPA- 53, for the sale of power...

  16. 77 FR 15096 - Bonneville Power Administration; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... Energy Regulatory Commission Bonneville Power Administration; Notice of Compliance Filing Take notice that on March 6, 2012, the Bonneville Power Administration (Bonneville) submitted a compliance filing.... Bonneville Power Admin., 137 FERC ] 61,185 (2011) (``Order''). Any person desiring to intervene or to...

  17. 77 FR 5247 - Southwestern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-02

    ... Energy Regulatory Commission Southwestern Power Administration; Notice of Filing Take notice that on... in Rate Order SWPA-63, Southwestern Power Administration Integrated System Rates, Rate Schedule P-11, Wholesale Rates for Hydro Peaking Power, Rate Schedule NFTS-11, Wholesale Rates for Non-Federal...

  18. 26 CFR 1.675-1 - Administrative powers.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 8 2011-04-01 2011-04-01 false Administrative powers. 1.675-1 Section 1.675-1... powers. (a) General rule. Section 675 provides in effect that the grantor is treated as the owner of any... the trust. If a grantor retains a power to amend the administrative provisions of a trust...

  19. 26 CFR 1.675-1 - Administrative powers.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 26 Internal Revenue 8 2012-04-01 2012-04-01 false Administrative powers. 1.675-1 Section 1.675-1... powers. (a) General rule. Section 675 provides in effect that the grantor is treated as the owner of any... the trust. If a grantor retains a power to amend the administrative provisions of a trust...

  20. 26 CFR 1.675-1 - Administrative powers.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 26 Internal Revenue 8 2014-04-01 2014-04-01 false Administrative powers. 1.675-1 Section 1.675-1... powers. (a) General rule. Section 675 provides in effect that the grantor is treated as the owner of any... the trust. If a grantor retains a power to amend the administrative provisions of a trust...

  1. 26 CFR 1.675-1 - Administrative powers.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 26 Internal Revenue 8 2013-04-01 2013-04-01 false Administrative powers. 1.675-1 Section 1.675-1... powers. (a) General rule. Section 675 provides in effect that the grantor is treated as the owner of any... the trust. If a grantor retains a power to amend the administrative provisions of a trust...

  2. 12 CFR 9.4 - Administration of fiduciary powers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... purchase services related to the exercise of fiduciary powers from another bank or other entity. (d) Bond... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Administration of fiduciary powers. 9.4 Section... OF NATIONAL BANKS Regulations § 9.4 Administration of fiduciary powers. (a) Responsibilities of the...

  3. Alaska Power Administration federal power program, Juneau, Alaska. Fiscal year 1991

    SciTech Connect

    Not Available

    1992-06-30

    This report presents the results of the independent certified public accountants` audit of the Department of Energy`s Alaska Power Administration (APA) financial statements as of September 30, 1991. In their opinion, the APA statements are fairly presented in all material respects in accordance with generally accepted accounting principles except as described in their report. Their reports on the APA internal control structure and on its compliance with laws and regulations are also provided. The US Government, through the Department of Energy operates APA at two sites to provide hydroelectric power to Juneau and Anchorage, Alaska.

  4. 29 CFR 417.6 - Powers of Administrative Law Judge.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 2 2010-07-01 2010-07-01 false Powers of Administrative Law Judge. 417.6 Section 417.6... Administrative Law Judge. The designated Administrative Law Judge shall have authority: (a) To give notice... other actions authorized by the regulations in this part. The Administrative Law Judge's authority...

  5. Administrative Management in NIE. A Report.

    ERIC Educational Resources Information Center

    Kirk, Irwin

    The purpose of this report is to recommend certain administrative management policies and procedures for the National Institute of Education (NIE). Administrative management activities for NIE are personnel, budget, finance, general services, contracts and grants, and overall administrative management. Management information is included in this…

  6. 75 FR 52527 - Southwestern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southwestern Power Administration; Notice of Filing August 19, 2010. Take notice that on August 17, 2010, the Department of Energy, Southwestern Power...

  7. 76 FR 58805 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing Take notice that on September 7, 2011, the Western Area Power Administration submitted its Rate Order No. WAPA-155 and certain...

  8. 76 FR 60015 - Southeastern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southeastern Power Administration; Notice of Filing Take notice that on September 8, 2011, the Southeastern Power Administration submitted its Rate Order No. SEPA-54 concerning...

  9. 76 FR 9771 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing Take notice that on February 7, 2011, the Western Area Power Administration submitted a notice of complete cancellation of its...

  10. 76 FR 58805 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing Take notice that on September 7, 2011, the Western Area Power Administration submitted its Rate Order No. WAPA-156, concerning...

  11. 76 FR 60015 - Southeastern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southeastern Power Administration; Notice of Filing Take notice that on September 14, 2011, the Southeastern Power Administration submitted its Rate Order No. SEPA-55 concerning...

  12. 76 FR 8726 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing Take notice that on February 3, 2011, the Western Area Power Administration, pursuant to Order No. 714,\\1\\ and the...

  13. 75 FR 65624 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing October 19, 2010. Take notice that on September 30, 2010, Western Area Power Administration submitted a tariff filing...

  14. 77 FR 56838 - Southeastern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southeastern Power Administration; Notice of Filing Take notice that on September 5, 2012, the Southeastern Power Administration submitted its Rate Order No. SEPA-56...

  15. 77 FR 65546 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing Take notice that on July 14, 2011, Western Area Power Administration submitted its revised version of its Tariff...

  16. 78 FR 62014 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing Take notice that on September 17, 2013, the Western Area Power Administration submitted its Rate Order No. WAPA-1626,...

  17. 77 FR 65545 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing Take notice that on August 13, 2012, Western Area Power Administration submitted its revised version of its Western...

  18. 76 FR 65718 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing Take notice that on September 23, 2011, Western Area Power Administration submitted its Rate Order No. WAPA-151 concerning...

  19. 76 FR 12957 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing Take notice that on March 3, 2011, the Western Area Power Administration, submitted its Open Access Transmission Tariff...

  20. 77 FR 65188 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing Take notice that on September 12, 2012, Western Area Power Administration submitted revisions to its Open Access Transmission...

  1. Western Area Power Administration. Combined power system financial statements and supplemental schedules

    SciTech Connect

    Not Available

    1991-09-30

    This report presents the results of the independent certified public accountants` audit of the Department of Energy`s Western Area Power Administration (Western) financial statements as of September 30, 1991. In their opinion, Western`s statements are fairly presented in all material respects in accordance with generally accepted accounting principles. Their reports on Western`s internal control structure and its compliance with laws and regulations, as well as a management letter addressing needed improvements are also provided. Western was established in December 1977, and has the responsibility for the Federal electric power marketing and transmission functions in 15 central and western states. Western markets power, as required by existing law, at the lowest possible rates consistent with sound business principles to recover the costs of operation and capital invested in power facilities.

  2. Bonneville Power Administration Communication Alarm Processor expert system:

    SciTech Connect

    Goeltz, R.; Purucker, S.; Tonn, B. ); Wiggen, T. ); MacGregor, D. )

    1990-06-01

    This report describes the Communications Alarm Processor (CAP), a prototype expert system developed for the Bonneville Power Administration by Oak Ridge National Laboratory. The system is designed to receive and diagnose alarms from Bonneville's Microwave Communications System (MCS). The prototype encompasses one of seven branches of the communications network and a subset of alarm systems and alarm types from each system. The expert system employs a backward chaining approach to diagnosing alarms. Alarms are fed into the expert system directly from the communication system via RS232 ports and sophisticated alarm filtering and mailbox software. Alarm diagnoses are presented to operators for their review and concurrence before the diagnoses are archived. Statistical software is incorporated to allow analysis of archived data for report generation and maintenance studies. The delivered system resides on a Digital Equipment Corporation VAX 3200 workstation and utilizes Nexpert Object and SAS for the expert system and statistical analysis, respectively. 11 refs., 23 figs., 7 tabs.

  3. Southwestern Power Administration Update, October- December 2004

    SciTech Connect

    2004-12-01

    On October 29, 2004, Southwestern and Southwest Power Pool, Inc. (SPP) reached agreement on interim arrangements to be implemented after the October 31, 2004, expiration of the membership agreement between the two parties. According to Jim McDonald, Director of Southwestern’s Division of Customer Service, the interim agreement forged between Southwestern and SPP seeks to minimize impacts to SPP as well as to Southwestern and its customers while Southwestern and SPP work on a seams/coordination agreement to succeed the expired membership agreement.

  4. Cost saving and safety issues in the Billings Area of the Western Area Power Administration

    SciTech Connect

    Not Available

    1980-09-11

    This report concerns possible cost savings that would result from a proposed transfer of power-dispatch functions from Fort Peck, Montana to Jamestown, North Dakota, in the Billings Area of the Western Area Power Administration (the Power Administration) and related issues concerning the reliability of service and the safety of personnel in the operation of the Billings Area of the Power Administration. Each of the three requests to the Inspector General (IG) raised the following questions: (1) Will the proposed transfer of the power dispatch function result in cost savings. (2) Will any detriment to the Power Administration's service to its Montana customers result from the transfer. (3) Will the safety of people who work on the electrical power systems in Montana be jeopardized by the transfer. IG recommended: (a) that the Power Administration reevaluate the adequacy of the plan to staff the Jamestown facility with a sufficient number of experienced power dispatchers familiar with the Montana power distribution system, and (b) that the Power Administration strictly enforce its published procedures for training, testing, and certifying operations and maintenance personnel.

  5. Inspection of surveillance activities and administrative leave policy at Bonneville Power Administration, Portland, Oregon

    SciTech Connect

    Not Available

    1994-04-01

    The authors conducted an inspection of surveillance activities and administrative leave policy at the Bonneville Power Administration, Portland, Oregon. The purpose of their inspection was to determine if a covert video surveillance operation conducted at Bonneville Power Administration was consistent with Department of Energy policies and procedures and other applicable regulations and procedures, and to determine if administrative leave policies and procedures used at Bonneville Power Administration in a specific instance were consistent with Department of Energy requirements and the Code of Federal Regulations. This inspection focused on a specific incident that occurred in 1989 on the 5th floor of the BPA Headquarters Building located in Portland, Oregon. The incident involved the soiling of an employee`s personal property with what appeared to be urine.

  6. 75 FR 9202 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing February 19, 2010. Take... Order No. WAPA-149, the power rate formula for the Provo River Project, for confirmation and...

  7. 75 FR 3223 - Southwestern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ... on an interim basis in Rate Order SWPA-62, Southwestern Power Administration Integrated System Rates, Rate Schedule P-09, Wholesale Rates for Hydro Peaking Power, Rate Schedule NFTS-09, Wholesale Rates for... authority vested by sections 301(b), 302(a), 402(e), 641, 642, 643, and 644, and by Delegation Order Nos. 00...

  8. Hawaiian Volcano Observatory 1956 Quarterly Administrative Reports

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. This report consists of four parts.

  9. Power Sewing Study. Final Report.

    ERIC Educational Resources Information Center

    Pommerville, Robert

    The Salt Lake City, Utah, Manpower Development and Training Act power sewing program was studied to ascertain its effectiveness in meeting the needs of the area needle craft industry. Specific factors examined were the system of referral of students to the program and qualifications of entry students, the administrative structure of the program,…

  10. Environmental audit, Bonneville Power Administration, lower Columbia area

    SciTech Connect

    Not Available

    1990-11-01

    This report documents the results of the US Department of Energy's (DOE's) Environmental Audit conducted by the DOE Headquarters Office of Environmental Audit within the Bonneville Power Administration's (BPA's) Lower Columbia Area. The BPA facilities included in the Audit are the Ross Complex in Vancouver, Washington; the substations of North Bonneville, North Bonneville Annex, Camas, and Longview within the state of Washington; and the Acton and Troutdale Substations within the state of Oregon. The independent Audit was conducted by a team of professionals from DOE and contractors. The purpose of the Audit is to provide the Secretary of Energy, Admiral James D. Watkins, Ret., with the status of environmental programs within BPA's Lower Columbia Area. The Environmental Audit team identified 25 findings dealing with the lack of conformance with federal and state laws and regulations and DOE Orders, and 7 findings in which BMPs were not attained. Although all findings require corrective action, none required cessation of operations or reflect situations that present an immediate risk to public health or the environment. The Audit team noted inadequacies in PCB management included storage, labeling, reporting, and spill control. The most significant causal factors for the findings include lack of policy implementation throughout the Lower Columbia Area, inadequate training of personnel charged with environmental protection, lack of standard operating procedures for many programs, lack of reviews and appraisals, and an inaccurate perception of low risk for environmental concerns.

  11. Southwestern Power Administration Combined Financial Statements, 2006-2009

    SciTech Connect

    2009-09-01

    We have audited the accompanying combined balance sheets of the Southwestern Federal Power System (SWFPS), as of September 30, 2009, 2008, 2007, and 2006, and the related combined statements of revenues and expenses, changes in capitalization, and cash flows for the years then ended. As described in note 1(a), the combined financial statement presentation includes the hydroelectric generation functions of another Federal agency (hereinafter referred to as the generating agency), for which Southwestern Power Administration (Southwestern) markets and transmits power. These combined financial statements are the responsibility of the management of Southwestern and the generating agency. Our responsibility is to express an opinion on these combined financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the combined financial statements are free of material misstatement. An audit includes consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of Southwestern and the generating agency’s internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the combined financial statements, assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall combined financial statement presentation. We believe that our audits provide a reasonable basis for our opinion. In our opinion, the combined financial statements referred to above present fairly, in all material respects, the respective financial position of the Southwestern Federal Power

  12. 78 FR 25433 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing Take notice that on April 24, 2013, the Secretary of the Department of Energy submitted its Rate Order No. WAPA-160...

  13. 78 FR 25434 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing Take notice that on April 4, 2013, the Deputy Secretary of the Department of Energy submitted its Rate Order No. WAPA-157...

  14. 75 FR 1050 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... [Federal Register Volume 75, Number 5 (Friday, January 8, 2010)] [Notices] [Page 1050] [FR Doc No: 2010-58] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EF10-1-000] Western Area Power Administration; Notice of Filing December 30, 2009. Take notice that on December 16, 2009,...

  15. 75 FR 62531 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing October 1, 2010. Take notice that on September 16, 2010, the Deputy Secretary of the Department of Energy, under the...

  16. 78 FR 64494 - Southwestern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southwestern Power Administration; Notice of Filing Take notice that on...), confirmed, approved, and placed in effect on an interim basis in Rate Order SWPA- 66, Southwestern...

  17. 78 FR 64494 - Southwestern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... Administration annual rate for the sale of power and energy from the Rayburn Project to the Sam Rayburn Dam Electric Cooperative, Inc. Any person desiring to intervene or to protest this filing must file in... must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions,...

  18. 75 FR 1052 - Western Area Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... [Federal Register Volume 75, Number 5 (Friday, January 8, 2010)] [Notices] [Page 1052] [FR Doc No: 2010-60] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EF10-3-000] Western Area Power Administration; Notice of Filing December 30, 2009. Take notice that on December 23, 2009,...

  19. Western Area Power Administration combined power system financial statements September 30, 1994 and 1993 and management overview and performance measurements

    SciTech Connect

    Marwick, P.

    1994-12-31

    The attached report presents the results of the independent certified public accountant`s audit of the Department of Energy`s Western Area Power Administration`s (Western) combined financial statements as of September 30, 1994. The auditors have expressed an unqualified opinion on Western`s 1994 statements. Their reports on Western`s internal control structure and on compliance with laws and regulations are also provided. Western was established in December 1977, and has the responsibility for the Federal electric power marketing and transmission functions in 15 central and western states. Western markets power, as required by existing law, at the lowest possible rates consistent with sound business principles to recover the costs of operation and capital invested in power facilities.

  20. Bonneville Power Administration 1993 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-01-01

    For the first time in a decade, Bonneville had to propose a double digit rate increase in 1993. Many of the causes were beyond our control, but self-examination and painful budget cuts put the focus squarely where it should be -- on the changes needed for BPA to compete in an increasingly market-driven business environment. As deregulation and change sweep the electricity industry, BPA has launched a major Competitiveness Project. It`s clear that we can, and will, cut costs and make ourselves more efficient. We can shape our products and services to better reflect what customers want and are willing to pay for. And more than ever we will measure and reward output -- results -- more than process. BPA today is the Northwest`s low-cost supplier of electricity and transmission services. To stay that way, we must adopt a more business-like model. The move does not signal a rejection of our role as a federal agency. In fact, close attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values.

  1. 1985 Firm Displacement Power Rate Proposal : Administrator's Record of Decision.

    SciTech Connect

    United States. Bonneville Power Administration.

    1986-06-01

    Bonneville Power Administration (BPA) first proposed a Firm Displacement Power (FD) rate in September 1984 as part of the initial 1985 wholesale rate proposal. The proposed FD rate was part of a package of rates designed to provide BPA flexibility in marketing its surplus firm power in a competitive and uncertain market. Believing that the rate needed further study, on December 11, 1984, BPA withdrew the proposed FD rate from consideration in the 1985 rate proceeding. BPA continued to pursue discussions with Pacific Northwest (PNW) and Pacific Southwest (PSW) utilities regarding potential sales of PNW surplus firm power to California markets. When several utilities expressed interest in the FD concept (in which BPA would sell its surplus firm power on a long-term basis to PNW utilities, who would use the FD power to serve their regional load and make a long-term firm sale of their own generating resources to the PSW), BPA held a series of weekly informal public meetings. The series of meetings, which began in June 1985, included discussion of contract issues. After assessing the discussions held at the first four meetings, BPA announced at the July 12, 1985, meeting that the FD rate would be developed in a hearing process pursuant to section 7(i) of the Pacific Northwest Electric Power Planning and Conservation Act (Pacific Northwest Power Act).

  2. Impacts on irrigated agriculture of changes in electricity costs resulting from Western Area Power Administration`s power marketing alternatives

    SciTech Connect

    Edwards, B.K.; Flaim, S.J.; Howitt, R.E.; Palmer, S.C.

    1995-03-01

    Irrigation is a major factor in the growth of US agricultural productivity, especially in western states, which account for more than 85% of the nation`s irrigated acreage. In some of these states, almost all cropland is irrigated, and nearly 50% of the irrigation is done with electrically powered pumps. Therefore, even small increases in the cost of electricity could have a disproportionate impact on irrigated agriculture. This technical memorandum examines the impacts that could result from proposed changes in the power marketing programs of the Western Area Power Administration`s Salt Lake City Area Office. The changes could increase the cost of power to all Western customers, including rural municipalities and irrigation districts that rely on inexpensive federal power to pump water. The impacts are assessed by translating changes in Western`s wholesale power rate into changes in the cost of pumping water as an input for agricultural production. Farmers can adapt to higher electricity prices in many ways, such as (1) using different pumping fuels, (2) adding workers and increasing management to irrigate more efficiently, and (3) growing more drought-tolerant crops. This study projects several responses, including using less groundwater and planting fewer waterintensive crops. The study finds that when dependence on Western`s power is high, the cost of power can have a major effect on energy use, agricultural practices, and the distribution of planted acreage. The biggest percentage changes in farm income would occur (1) in Nevada and Utah (however, all projected changes are less than 2% of the baseline) and (2) under the marketing alternatives that represent the lowest capacity and energy offer considered in Western`s Electric Power Marketing Environmental Impact Statement. The aggregate impact on farm incomes and the value of total farm production would be much smaller than that suggested by the changes in water use and planted acreage.

  3. Unleashing the power of administrative health data: the Scottish model.

    PubMed

    Pavis, Stephen; Morris, Andrew D

    2015-09-30

    Data and information generated through the provision and administration of health and social care provide potentially valuable untapped resources that can contribute to the development of effective and efficient services. We describe the Scottish system, which seeks to unleash, at scale, the power of administrative and health service data as part of the UK-wide Farr Institute of Health Informatics Research program. The 'Scottish model' balances current public attitudes and views around the use of administrative and health data for research purposes with researchers' data requirements, and does so within Scotland's legal framework. The past 3 years has seen the completion of more than 150 projects by researchers from industry (17%), academia (53%) and health service providers (30%). In the future, the aim will be to ensure that research findings are disseminated widely and used to both improve health service provision and further develop public trust.

  4. Hawaiian Volcano Observatory 1977 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  5. Hawaiian Volcano Observatory 1978 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  6. Hawaiian Volcano Observatory 1984 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  7. Hawaiian Volcano Observatory 1961 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  8. Hawaiian Volcano Observatory 1960 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  9. Hawaiian Volcano Observatory 1981 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  10. Hawaiian Volcano Observatory 1957 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  11. Hawaiian Volcano Observatory 1968 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  12. Hawaiian Volcano Observatory 1969 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  13. Hawaiian Volcano Observatory 1967 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  14. Hawaiian Volcano Observatory 1970 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  15. Hawaiian Volcano Observatory 1971 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  16. Hawaiian Volcano Observatory 1974 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  17. Hawaiian Volcano Observatory 1965 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  18. Hawaiian Volcano Observatory 1958 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  19. Hawaiian Volcano Observatory 1975 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  20. Hawaiian Volcano Observatory 1982 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  1. Hawaiian Volcano Observatory 1966 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  2. Hawaiian Volcano Observatory 1972 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  3. Hawaiian Volcano Observatory 1963 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  4. Hawaiian Volcano Observatory 1959 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  5. Hawaiian Volcano Observatory 1983 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  6. Hawaiian Volcano Observatory 1985 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  7. Hawaiian Volcano Observatory 1976 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  8. Hawaiian Volcano Observatory 1964 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  9. Hawaiian Volcano Observatory 1973 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  10. Hawaiian Volcano Observatory 1980 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  11. Hawaiian Volcano Observatory 1979 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  12. Hawaiian Volcano Observatory 1962 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  13. IVA. Improving Vocational Administration. Final Report.

    ERIC Educational Resources Information Center

    EPD Consortium D, Richardson, TX.

    The Texas Improving Vocational Administration (IVA) project was conceived to improve preservice and inservice programs for vocational education administrators. Primary objectives were to (1) develop a method, including a survey, to determine existing inservice and preservice administrative training program competencies; (2) determine, using the…

  14. IVA. Improving Vocational Administration. Final Report.

    ERIC Educational Resources Information Center

    EPD Consortium D, Richardson, TX.

    The Texas Improving Vocational Administration (IVA) project was conceived to improve preservice and inservice programs for vocational education administrators. Primary objectives were to (1) develop a method, including a survey, to determine existing inservice and preservice administrative training program competencies; (2) determine, using the…

  15. The inspection of power purchase contracts at the Western Area Power Administration

    SciTech Connect

    1995-05-01

    The Office of Inspector General received an allegation regarding possible irregularities in certain power purchase contracts awarded by the Western Area Power Administration (WAPA). Based on our survey of WAPA`s power purchase procedures, we expanded our allegation based inquiry to include several management issues. Thus, the purpose of this inspection was to review the specific allegation as well as to evaluate WAPA`s power purchase contracting procedures relating to competition, the documentation of the solicitation, negotiation, and award processes, and the determination of the reasonableness of the rates negotiated by WAPA.

  16. Barriers to nurses' reporting of medication administration errors in Taiwan.

    PubMed

    Chiang, Hui-Ying; Pepper, Ginette A

    2006-01-01

    To describe nurses' perceptions of reporting barriers to reporting medication administration errors (MAE) and to examine the relationship between the barriers to MAE reporting and cultural factors and nursing work environment in Taiwan. A cross-sectional, descriptive correlational design with self-administered questionnaires was conducted in one large medical center hospital in southern Taiwan. The measurement tools included the Chinese versions of the Work Environment Questionnaire, Barriers to MAE Reporting, Index of Hierarchy of Authority, and Face-Concern scale. A mail survey of 807 nurses using the Total Design Method was implemented for data collection with 597 questionnaires used in data analyses. The major perceived barrier was fear. Regression analysis showed that power hierarchy, face-saving concern, and work environment factors (e.g., quality management and peer relations) accounted for 54.6% variance in the barriers. Age, educational background, working experience, experience of having made MAEs, and failure to report MAEs were not associated with the barriers. Taiwanese nurses perceived similar barriers to MAE reporting. The more power hierarchy and face-saving concern the nurses agreed on, the more barriers they perceived. The association between the barriers and nursing work environment was negative and weak.

  17. Pulsed power peer review committee report.

    SciTech Connect

    Not Available

    2004-08-01

    As part of meeting the GRPA (Government Performance and Results Act) requirements and to provide input to Sandia's annual Performance Evaluation Assessment Report (PEAR) to the National Nuclear Security Administration in FY2004, a 14-member external review committee chaired by Dr. Alvin Trivelpiece was convened by Sandia National Laboratories (SNL) on May 4-6, 2004 to review Sandia National Laboratories' Pulsed Power Programs. The scope of the review included activities in high energy density physics (HEDP), inertial confinement fusion (ICF), radiation/weapon physics, the petawatt laser initiative (PW) and fast ignition, equation-of state studies, radiation effects science and lethality, x-ray radiography, ZR development, basic research and pulsed power technology research and development, as well as electromagnetics and work for others. In his charge to the Committee, Dr. Jeffrey P. Quintenz, Director of Pulsed Power Sciences (Org. 1600) asked that the evaluation and feedback be based on three criteria: (1) quality of technical activities in science, technology, and engineering, (2) programmatic performance, management, and planning, and (3) relevance to national needs and agency missions. In addition, the director posed specific programmatic questions. The accompanying report, produced as a SAND document, is the report of the Committee's finding.

  18. Regional economic impacts of changes in electricity rates resulting from Western Area Power Administration`s power marketing alternatives

    SciTech Connect

    Allison, T.; Griffes, P.; Edwards, B.K.

    1995-03-01

    This technical memorandum describes an analysis of regional economic impacts resulting from changes in retail electricity rates due to six power marketing programs proposed by Western Area Power Administration (Western). Regional economic impacts of changes in rates are estimated in terms of five key regional economic variables: population, gross regional product, disposable income, employment, and household income. The REMI (Regional Impact Models, Inc.) and IMPLAN (Impact Analysis for Planning) models simulate economic impacts in nine subregions in the area in which Western power is sold for the years 1993, 2000, and 2008. Estimates show that impacts on aggregate economic activity in any of the subregions or years would be minimal for three reasons. First, the utilities that buy power from Western sell only a relatively small proportion of the total electricity sold in any of the subregions. Second, reliance of Western customers on Western power is fairly low in each subregion. Finally, electricity is not a significant input cost for any industry or for households in any subregion.

  19. Evaluating Administrative Performance. An ERS Report.

    ERIC Educational Resources Information Center

    Nygaard, Debra D.

    The evaluation of administrative and supervisory personnel is receiving increasing attention by State legislatures, the public at large, and the education profession. At least nine States now mandate periodic, formal evaluations of administrative and supervisory personnel in their public schools. As a result of these State mandates and the…

  20. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  1. Early Childhood Centre Administrator Certification. Project Report.

    ERIC Educational Resources Information Center

    Ferguson, E. Elaine

    This document presents the process for obtaining certification for the position of early childhood centre administrator (ECCA) in Nova Scotia, Canada. Following an introduction describing the development of the process and its pilot testing, Chapter 1 of the document details the four-step process: (1) application, including training in the ECCA…

  2. Reporting ethics committee approval in public administration research.

    PubMed

    Jordan, Sara R; Gray, Phillip W

    2014-03-01

    While public administration research is thriving because of increased attention to social scientific rigor, lingering problems of methods and ethics remain. This article investigates the reporting of ethics approval within public administration publications. Beginning with an overview of ethics requirements regarding research with human participants, I turn to an examination of human participants protections for public administration research. Next, I present the findings of my analysis of articles published in the top five public administration journals over the period from 2000 to 2012, noting the incidences of ethics approval reporting as well as funding reporting. In explicating the importance of ethics reporting for public administration research, as it relates to replication, reputation, and vulnerable populations, I conclude with recommendations for increasing ethics approval reporting in public administration research.

  3. Report Card on Nuclear Power

    ERIC Educational Resources Information Center

    Novick, Sheldon

    1974-01-01

    Problems facing the nuclear power industry include skyrocketing construction costs, technical failures, fuel scarcity, power plant safety, and the disposal of nuclear wastes. Possible solutions include: reductions in nuclear power plant construction, a complete moratorium on new plant construction, the construction of fast breeder reactors and the…

  4. Report Card on Nuclear Power

    ERIC Educational Resources Information Center

    Novick, Sheldon

    1974-01-01

    Problems facing the nuclear power industry include skyrocketing construction costs, technical failures, fuel scarcity, power plant safety, and the disposal of nuclear wastes. Possible solutions include: reductions in nuclear power plant construction, a complete moratorium on new plant construction, the construction of fast breeder reactors and the…

  5. Audit of Bonneville Power Administration`s management of Information Resources

    SciTech Connect

    1996-04-02

    Bonneville Power Administration`s (Bonneville) information resources include computer-related equipment, spare parts, and computer software. The objective of this audit was to determine whether Bonneville acquired and accounted for computer-related equipment properly. We found positive aspects in Bonneville`s management of computer-related equipment. However, improvements could be made in implementing credit card and property procedures. Specifically, we found that improvements were needed to (1) control credit card purchases, (2) ensure that equipment was tagged and included in property records, (3) maintain accountability over spare parts, and (4) identify unused equipment. As a result, about $90,000 of equipment was bought by personnel whose authority to purchase was not properly documented, and about $182,000 of purchases lacked supporting invoices. In addition, one maintenance support group had over $109,000 of spare parts shortages. Furthermore, Bonneville could have saved about $803,000 had unused equipment been redistributed within Bonneville or to other Federal and state agencies. Management concurred with the recommendations to improve internal controls.

  6. Valuation of selected environmental impacts associated with Bonneville Power Administration Resource Program alternatives

    SciTech Connect

    Englin, J E; Gygi, K F

    1992-03-01

    This report documents work undertaken by the Pacific Northwest Laboratory (PNL) and its contractors to assist the Bonneville Power Administration (Bonneville) in assessing the potential environmental consequences of new power resources. A major purpose of this effort is to describe and evaluate the techniques available for economic valuation of environmental costs. Another is to provide estimates of the environmental costs associated with specific power resources called for under Bonneville's Resource Programs. Bonneville's efforts to extend valuation techniques to as many impacts as can be reliably assessed represents a substantial advance in the application of state-of-the-art economic techniques to environmental assessments. This economic analysis evaluates effects on human health, wildlife, crops, and visibility impacts associated with air pollution. This report also discusses river recreation (primarily fishing) which may be affected by fluctuations in water levels. 70 refs.

  7. Green Power Partnership Annual Reporting Requirements

    EPA Pesticide Factsheets

    The U.S. EPA's Green Power Partnership is a voluntary partnership program designed to reduce the environmental impact of electricity generation by promoting renewable energy. Partners commit to submitting a report on their green power use annually.

  8. 2009 Water Power Peer Review Report

    SciTech Connect

    Murphy, Michael; Higgins, Mark; Reed, Mike

    2011-04-01

    This report contains the findings of the 2009 Water Power Peer Review Panel, as well as the Water Power Program's responses to those findings. This Peer Review focused on the Program's marine and hydrokinetic energy projects.

  9. Psychological safety and error reporting within Veterans Health Administration hospitals.

    PubMed

    Derickson, Ryan; Fishman, Jonathan; Osatuke, Katerine; Teclaw, Robert; Ramsel, Dee

    2015-03-01

    In psychologically safe workplaces, employees feel comfortable taking interpersonal risks, such as pointing out errors. Previous research suggested that psychologically safe climate optimizes organizational outcomes. We evaluated psychological safety levels in Veterans Health Administration (VHA) hospitals and assessed their relationship to employee willingness of reporting medical errors. We conducted an ANOVA on psychological safety scores from a VHA employees census survey (n = 185,879), assessing variability of means across racial and supervisory levels. We examined organizational climate assessment interviews (n = 374) evaluating how many employees asserted willingness to report errors (or not) and their stated reasons. Finally, based on survey data, we identified 2 (psychologically safe versus unsafe) hospitals and compared their number of employees who would be willing/unwilling to report an error. Psychological safety increased with supervisory level (P < 0.001, η = 0.03) and was not meaningfully related to race (P < 0.001, η = 0.003). Twelve percent of employees would not report an error; retaliation fear was the most commonly mentioned deterrent. Furthermore, employees at the psychologically unsafe hospital (71% would report, 13% would not) were less willing to report an error than at the psychologically safe hospital (91% would, 0% would not). A substantial minority would not report an error and were willing to admit so in a private interview setting. Their stated reasons as well as higher psychological safety means for supervisory employees both suggest power as an important determinant. Intentions to report were associated with psychological safety, strongly suggesting this climate aspect as instrumental to improving patient safety and reducing costs.

  10. CSREES Administrator's Report to the Partnership, Fall 2008

    ERIC Educational Resources Information Center

    Cooperative State Research, Education, and Extension Service, 2008

    2008-01-01

    The "Administrator's Report to the Partnership" includes updates on legislation, grant programs, the budget, and information about other activities. The Fall 2008 report includes: (1) Message from the CSREES Administrator (Colien Hefferan); (2) Transformative Graduate Education in Natural Resources and Environment; (3) Expanding Education to…

  11. 24 CFR 2700.345 - Administrative reports and examinations.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Development (Continued) EMERGENCY MORTGAGE INSURANCE AND LOAN PROGRAMS, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT EMERGENCY HOMEOWNERS' LOAN PROGRAM Mortgage Insurance § 2700.345 Administrative reports and... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Administrative reports...

  12. 24 CFR 2700.345 - Administrative reports and examinations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Development (Continued) EMERGENCY MORTGAGE INSURANCE AND LOAN PROGRAMS, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT EMERGENCY HOMEOWNERS' LOAN PROGRAM Mortgage Insurance § 2700.345 Administrative reports and... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Administrative reports...

  13. 29 CFR 1955.12 - Administrative law judge; powers and duties.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Administrative law judge; powers and duties. 1955.12... Formal Proceeding § 1955.12 Administrative law judge; powers and duties. (a) The administrative law judge... U.S.C. 554-557 (hereinafter called the APA). (b) On any procedural question not otherwise regulated...

  14. 29 CFR 1955.12 - Administrative law judge; powers and duties.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Administrative law judge; powers and duties. 1955.12... Formal Proceeding § 1955.12 Administrative law judge; powers and duties. (a) The administrative law judge... U.S.C. 554-557 (hereinafter called the APA). (b) On any procedural question not otherwise regulated...

  15. Comparison of administrative-only versus administrative plus chart review data for reporting HEDIS hybrid measures.

    PubMed

    Pawlson, L Gregory; Scholle, Sarah Hudson; Powers, Anne

    2007-10-01

    Health plans, medical groups, and commercial vendors are using administrative data to measure clinical performance at the plan or physician level. We compared results of using administrative claims data alone versus administrative data combined with chart review for selected Healthcare Effectiveness Data and Information Set (HEDIS) measures. Cross-sectional comparison of health plan performance rates using different methods of data collection. We analyzed data reported by 283 commercial managed care plans in 2004 and 2006 for 15 HEDIS hybrid measures. Hybrid specifications included the use of administrative data supplemented with medical record review and required plans to report performance rates based on administrative data only and for administrative data supplemented with chart review. We calculated differences in rates and changes in quartile rankings of health plans between the 2 reported rates. Performance rates using administrative data alone were substantially lower than rates using combined data (average difference of 20.4 percentage points). On average, more than half of the plans had different quartile rankings based on administrative-only rates versus combined data rates. Measures relying on laboratory claims or laboratory results had the largest discrepancies. Currently available health plan administrative data alone do not appear to provide sufficiently complete results for ranking health plans on HEDIS quality-of-care measures with hybrid specifications. The results suggest that reporting of clinical performance measures using administrative data alone should include prior testing and reporting on the completeness of data, relative rates, and changes in rankings compared with the use of combined administrative data and chart review.

  16. Solar power satellite status report

    NASA Technical Reports Server (NTRS)

    Davis, H. P.

    1977-01-01

    The development of a solar power satellite program is considered. It is suggested that the solar power satellite is an engineering rather than a science program - that is, that no scientific breakthroughs are required before initiating the project. Available technology is examined, and several key questions are discussed: how efficient is microwave transfer of energy; how feasible is construction in space; and will the advantages of continuous insolation compensate for the costs of building a solar power plant in synchronous orbit 23,000 miles above the earth.

  17. Solar power satellite status report

    NASA Technical Reports Server (NTRS)

    Davis, H. P.

    1977-01-01

    The development of a solar power satellite program is considered. It is suggested that the solar power satellite is an engineering rather than a science program - that is, that no scientific breakthroughs are required before initiating the project. Available technology is examined, and several key questions are discussed: how efficient is microwave transfer of energy; how feasible is construction in space; and will the advantages of continuous insolation compensate for the costs of building a solar power plant in synchronous orbit 23,000 miles above the earth.

  18. 20 CFR 422.306 - Report of overdue administrative debts to credit reporting agencies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... reporting agencies. (a) Debts we will report. We will report to credit reporting agencies all overdue... report any administrative debt to a credit reporting agency, we will send the debtor written notice of... credit reporting agencies. 422.306 Section 422.306 Employees' Benefits SOCIAL SECURITY ADMINISTRATION...

  19. 20 CFR 422.306 - Report of overdue administrative debts to credit reporting agencies.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... reporting agencies. (a) Debts we will report. We will report to credit reporting agencies all overdue... report any administrative debt to a credit reporting agency, we will send the debtor written notice of... credit reporting agencies. 422.306 Section 422.306 Employees' Benefits SOCIAL SECURITY ADMINISTRATION...

  20. 20 CFR 422.306 - Report of overdue administrative debts to credit reporting agencies.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... reporting agencies. (a) Debts we will report. We will report to credit reporting agencies all overdue... report any administrative debt to a credit reporting agency, we will send the debtor written notice of... credit reporting agencies. 422.306 Section 422.306 Employees' Benefits SOCIAL SECURITY ADMINISTRATION...

  1. 20 CFR 422.306 - Report of overdue administrative debts to credit reporting agencies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... reporting agencies. (a) Debts we will report. We will report to credit reporting agencies all overdue... report any administrative debt to a credit reporting agency, we will send the debtor written notice of... credit reporting agencies. 422.306 Section 422.306 Employees' Benefits SOCIAL SECURITY ADMINISTRATION...

  2. 20 CFR 422.306 - Report of overdue administrative debts to credit reporting agencies.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... reporting agencies. (a) Debts we will report. We will report to credit reporting agencies all overdue... report any administrative debt to a credit reporting agency, we will send the debtor written notice of... credit reporting agencies. 422.306 Section 422.306 Employees' Benefits SOCIAL SECURITY ADMINISTRATION...

  3. School Consolidation: Easing the Transition. Administrative Report.

    ERIC Educational Resources Information Center

    Moray, Mary

    Changing population patterns, inflated housing costs, and cuts in school financing have forced many school districts to face school closures and school consolidation as a way of maintaining solvency. This report reviews the literature on school consolidation with attention to the fact that the need to consolidate now faces elementary schools as…

  4. School Consolidation: Easing the Transition. Administrative Report.

    ERIC Educational Resources Information Center

    Moray, Mary

    Changing population patterns, inflated housing costs, and cuts in school financing have forced many school districts to face school closures and school consolidation as a way of maintaining solvency. This report reviews the literature on school consolidation with attention to the fact that the need to consolidate now faces elementary schools as…

  5. Bonneville Power Administration Weatherize Program; Approved Products List (APL), June 1994.

    SciTech Connect

    United States. Bonneville Power Administration

    1994-06-01

    This document contains a listing of approved products and manufacturers for the Bonneville Power Administration`s Weatherwise Program. Product listing are arranged by sections and include: Storm windows; Weatherstripping; Caulking; Insulation; Thermostats; and Air-to-air heat exchangers.

  6. Acceptance test report: Backup power system

    SciTech Connect

    Cole, D.B.

    1996-01-26

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control.

  7. Lunar power systems. Final report

    SciTech Connect

    Not Available

    1986-12-01

    The findings of a study on the feasibility of several methods of providing electrical power for a permanently manned lunar base are provided. Two fundamentally different methods for lunar electrical power generation are considered. One is the use of a small nuclear reactor and the other is the conversion of solar energy to electricity. The baseline goal was to initially provide 300 kW of power with growth capability to one megawatt and eventually to 10 megawatts. A detailed, day by day scenario for the establishment, build-up, and operational activity of the lunar base is presented. Also presented is a conceptual approach to a supporting transportation system which identifies the number, type, and deployment of transportation vehicles required to support the base. An approach to the use of solar cells in the lunar environment was developed. There are a number of heat engines which are applicable to solar/electric conversions, and these are examined. Several approaches to energy storage which were used by the electric power utilities were examined and those which could be used at a lunar base were identified.

  8. Electrical Power Working Group report

    NASA Technical Reports Server (NTRS)

    Vanommering, Gerrit; Myers, Ira T.

    1986-01-01

    The status of and need for power technologies for Spacecraft 2000 were assessed and development programs required to establish an achievable and competitive technology base for spacecraft of the 21st century were identified. The results are summarized, including the recommendations and the underlying rationale.

  9. Washington State Nursing Home Administrator Model Curriculum. Final Report.

    ERIC Educational Resources Information Center

    Cowan, Florence Kelly

    The course outlines presented in this final report comprise a proposed Fort Steilacoom Community College curriculum to be used as a statewide model two-year associate degree curriculum for nursing home administrators. The eight courses described are introduction to nursing, home administration, financial management of nursing homes, nursing home…

  10. First Semiannual Report of the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Glennan, T. Keith

    1959-01-01

    The First Semiannual Report of the National Aeronautics and Space Administration (NASA) is submitted to Congress pursuant to section 206 (a) of the National Aeronautics and Space Act of 1958 (Public Law 85-568) to provide for research into problems of flight within and outside the Earth's atmosphere, which states: The Administration shall submit to the President for transmittal to Congress, semiannually and at such other times as it deems desirable, a report on its activities and accomplishments.

  11. Bonneville Power Administration and Rural Electrification Administration actions and activities affecting utility participation in Washington Public Power Supply System Plants 4 and 5

    SciTech Connect

    Not Available

    1982-07-30

    Congressman George Hansen asked GAO to examine the roles of the Bonneville Power Administration and the Rural Electrification Administration in development and termination of Washington Public Power Supply System Plants 4 and 5. The GAO found that BPA provided electric demand forecasting help to small regional utilities, endorsed the need for additional generating units, supported utility participation in the plants, and acted to indirectly facilitate termination of the plants; and that REA directed its borrowers to pay their debts to the Washington Public Power Supply System and implied their financial standing with REA could be affected if their obligations on plants 4 and 5 are not met.

  12. The future of the Bonneville Power Administration: Aggressive competitor or bureaucratic dinosaur?

    SciTech Connect

    Hardy, R.W.

    1999-01-01

    Splitting the Bonneville Power Administration into fully separate generating and transmission entities is the only step, short of privatization or regionalization, that would eliminate the conflict between compliance with the Federal Energy Regulatory Commission`s open access requirements and the need to maximize Bonneville Power Administration revenues for taxpayers.

  13. Teacher Views on School Administrators' Organizational Power Sources and Their Change Management Behaviours

    ERIC Educational Resources Information Center

    Argon, Türkan; Dilekçi, Ümit

    2016-01-01

    This study aimed to determine school administrators' organizational power sources and change management behaviours based on Bolu central district primary and secondary school teachers' views. The study conducted with relational screening model reached 286 teachers. School Administrators' Organizational Power Sources Scale and Change Management…

  14. 78 FR 15718 - United States Department of Energy, Bonneville Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission United States Department of Energy, Bonneville Power Administration; Notice of Filing Take notice that on March 1, 2013, the Bonneville Power Administration filed a...

  15. Power, Status, and Cognitive Territory in Educational Administration.

    ERIC Educational Resources Information Center

    Ramsey, Margaret A.

    This paper attempts to develop a greater understanding of and suggest some methods for defining day-to-day changes in policy and predicting the operation of power and status affecting educational decisions. Physical and cognitive territoriality have meaning in the study and exercise of power and status, and are essential elements in understanding,…

  16. Evaluation of the Super Efficient Refrigerator Program (SERP) in the Bonneville Power Administration service territory

    SciTech Connect

    Lee, A.D.; Conger, R.L.

    1996-06-01

    The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. it is one of the first examples of large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the evaluation of SERP ({open_quotes}the Program{close_quotes}) in the Bonneville Power Administration`s (Bonneville`s) service territory. Pacific Northwest National Laboratory (PNNL) conducted this evaluation for Bonneville. This study includes the process evaluation, preliminary impact evaluation, and market transformation assessment. It is based on site visits and interviews with refrigerator dealers and manufacturers, industry data, and Bonneville information. Results from this study are compared with those from a parallel study that examines the Program across the 24 participating utilities.

  17. 5 CFR 2423.31 - Powers and duties of the Administrative Law Judge at the hearing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Law Judge at the hearing. 2423.31 Section 2423.31 Administrative Personnel FEDERAL LABOR RELATIONS... LABOR PRACTICE PROCEEDINGS Hearing Procedures § 2423.31 Powers and duties of the Administrative Law Judge at the hearing. (a) Conduct of hearing. The Administrative Law Judge shall conduct the hearing...

  18. 5 CFR 2423.24 - Powers and duties of the Administrative Law Judge during prehearing proceedings.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 3 2013-01-01 2013-01-01 false Powers and duties of the Administrative... duties of the Administrative Law Judge during prehearing proceedings. (a) Prehearing procedures. The... from, as appropriate, introducing evidence, calling witnesses, raising objections to the introduction...

  19. Impact of the 2014 Food and Drug Administration Warnings Against Power Morcellation.

    PubMed

    Lum, Deirdre A; Sokol, Eric R; Berek, Jonathan S; Schulkin, Jay; Chen, Ling; McElwain, Cora-Ann; Wright, Jason D

    2016-01-01

    To determine whether members of the AAGL Advancing Minimally Invasive Gynecologic Surgery Worldwide (AAGL) and members of the American College of Obstetricians and Gynecologists Collaborative Ambulatory Research Network (ACOG CARN) have changed their clinical practice based on the 2014 Food and Drug Administration (FDA) warnings against power morcellation. A survey study. Participants were invited to complete this online survey (Canadian Task Force classification II-2). AAGL and ACOG CARN members. An online anonymous survey with 24 questions regarding demographics and changes to clinical practice during minimally invasive myomectomies and hysterectomies based on the 2014 FDA warnings against power morcellation. A total of 615 AAGL members and 54 ACOG CARN members responded (response rates of 8.2% and 60%, respectively). Before the FDA warnings, 85.8% and 86.9%, respectively, were using power morcellation during myomectomies and hysterectomies. After the FDA warnings, 71.1% and 75.8% of respondents reported stopping the use of power morcellation during myomectomies and hysterectomies. The most common reasons cited for discontinuing the use of power morcellation or using it less often were hospital mandate (45.6%), the concern for legal consequences (16.1%), and the April 2014 FDA warning (13.9%). Nearly half of the respondents (45.6%) reported an increase in their rate of laparotomy. Most (80.3%) believed that the 2014 FDA warnings have not led to an improvement in patient outcomes and have led to harming patients (55.1%). AAGL and ACOG CARN respondents reported decreased use of power morcellation during minimally invasive gynecologic surgery after the 2014 FDA warnings, the most common reason cited being hospital mandate. Rates of laparotomy have increased. Most members surveyed believe that the FDA warnings have not improved patient outcomes. Copyright © 2016 AAGL. Published by Elsevier Inc. All rights reserved.

  20. 2014 Water Power Program Peer Review Report

    SciTech Connect

    none,

    2014-08-18

    The Water Power Peer Review Meeting was held February 24-28, 2014 in Arlington, VA. Principle investigators from the Energy Department National Laboratories, academic, and industry representatives presented the progress of their DOE-funded research. This report documents the formal, rigorous evaluation process and findings of nine independent reviewers who examined the technical, scientific, and business results of 96 projects of the Water Power Program, as well as the productivity and management effectiveness of the Water Power Program itself.

  1. Solar-powered car. Final report

    SciTech Connect

    Plank, D.

    1982-03-30

    The work reported was to modify a commercially available electric vehicle to use power generated by solar cells. Besides the technical and financial aspects of constructing the car, media publicity and public showings of the car are discussed. (LEW)

  2. Non-Treaty Storage Agreement / Bonneville Power Administration.

    SciTech Connect

    United States. Bonneville Power Administration; B.C. Hydro

    1990-03-01

    Appendices A thru L are included in this volume. The appendices contain information dealing with: treaty and non-treaty agreements, analytical methods and assumptions, storage use, power systems effects, economic analyses, PNW hydropower systems planning and operation, wildlife studies, and other environmental impacts. (JEF)

  3. 77 FR 65679 - Southwestern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-30

    ... Sam Rayburn Municipal Power Agency. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR... become a party must file a notice of intervention or motion to intervene, as appropriate. Such...

  4. Solar thermal power systems. Summary report

    SciTech Connect

    Not Available

    1980-06-01

    The work accomplished by the Aerospace Corporation from April 1973 through November 1979 in the mission analysis of solar thermal power systems is summarized. Sponsorship of this effort was initiated by the National Science Foundation, continued by the Energy Research and Development Administration, and most recently directed by the United States Department of Energy, Division of Solar Thermal Systems. Major findings and conclusions are sumarized for large power systems, small power systems, solar total energy systems, and solar irrigation systems, as well as special studies in the areas of energy storage, industrial process heat, and solar fuels and chemicals. The various data bases and computer programs utilized in these studies are described, and tables are provided listing financial and solar cost assumptions for each study. An extensive bibliography is included to facilitate review of specific study results and methodology.

  5. Impacts of Western Area Power Administration`s power marketing alternatives on retail electricity rates and utility financial viability

    SciTech Connect

    Bodmer, E.; Fisher, R.E.; Hemphill, R.C.

    1995-03-01

    Changes in power contract terms for customers of Western`s Salt Lake City Area Office affect electricity rates for consumers of electric power in Arizona, Colorado, Nevada, New Mexico, Utah, and Wyoming. The impacts of electricity rate changes on consumers are studied by measuring impacts on the rates charged by individual utility systems, determining the average rates in regional areas, and conducting a detailed rate analysis of representative utility systems. The primary focus is an evaluation of the way retail electricity rates for Western`s preference customers vary with alternative pricing and power quantity commitment terms under Western`s long-term contracts to sell power (marketing programs). Retail rate impacts are emphasized because changes in the price of electricity are the most direct economic effect on businesses and residences arising from different Western contractual and operational policies. Retail rates are the mechanism by which changes in cost associated with Western`s contract terms are imposed on ultimate consumers, and rate changes determine the dollar level of payments for electric power incurred by the affected consumers. 41 figs., 9 tabs.

  6. Skills Enhancement Program. Performance Report, Evaluation Report, and Administration Manual.

    ERIC Educational Resources Information Center

    Wayne County Community Coll., Detroit, MI.

    This document contains three products of the Skills Enhancement Program, a cooperative venture between Industrial Technology Institute (ITI), Wayne County (Michigan) Community College (WCCC), and Great Lakes Steel (GLS). The performance report describes the project's objective of designing a job-related literacy curriculum for hourly workers and…

  7. 24 CFR 2700.440 - Administrative report and examinations.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Administrative report and examinations. 2700.440 Section 2700.440 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) EMERGENCY MORTGAGE INSURANCE AND LOAN PROGRAMS, DEPARTMENT OF HOUSING AND...

  8. 43 CFR 2372.2 - Report to General Services Administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Report to General Services Administration. 2372.2 Section 2372.2 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) RESTORATIONS AND...

  9. National Association of Physical Plant Administrators Standards Committee Report, 1966.

    ERIC Educational Resources Information Center

    National Association of Physical Plant Administrators of Universities and Colleges, Richmond, IN.

    The 1966 report of the National Standards Committee summarizes the results of the 1965 questionnaire from 89 institutions of higher education which are listed by name. Tabulations and graphs of data are given in the areas of the cost of administration of the plant operation, janitorial services, utilities, grounds, labor, traffic and security.…

  10. Development and Validation of the Medication Administration Error Reporting Survey

    DTIC Science & Technology

    2005-01-01

    failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 2005 2. REPORT TYPE N...Safety: From Research to Implementation. Volumes 1-4, AHRQ Publication Nos. 050021 (1-4). February 2005 . Agency for Healthcare Research and Quality...medication administration error rates. Am J Med Qual 1999 Mar–Apr;14(2):73–80. 44. Wakefield B, Blegen M, Uden-Holman T, et al. Organizational

  11. 78 FR 22540 - Department of Energy, Bonneville Power Administration; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Department of Energy, Bonneville Power Administration; Notice of Petition... the Federal Energy Regulatory Commission's (Commission) Rules of Practice and Procedure, 18 CFR...

  12. Status Report on Power System Transformation: A 21st Century Power Partnership Report

    SciTech Connect

    Miller, Mackay; Martinot, Eric; Cox, Sadie; Speer, Bethany; Zinaman, Owen; Booth, Sam; Zissler, Romain; Cochran, Jaquelin; Soonee, S. K.; Audinet, Pierre; Munuera, Luis; Arent, Doug

    2015-05-27

    This report has three primary goals: (1) to articulate the concept of power system transformation; (2) to explore the current global landscape of ‘innovations’ that constitute power system transformation and provide evidence of how these innovations are emerging; and (3) to suggest an analytical framework for assessing the status of power system transformation on an on-going basis.

  13. Reported analgesic administration to rabbits undergoing experimental surgical procedures.

    PubMed

    Coulter, Claire A; Flecknell, Paul A; Leach, Matthew C; Richardson, Claire A

    2011-02-21

    It has become widely accepted that whenever animals are used in scientific procedures, the 3Rs principle of replacement, reduction and refinement described by William Russell and Rex Burch should be adhered to. Animals should be replaced with non-sentient alternatives if possible, the number of animals used should be reduced and experimental procedures should be refined to minimise pain, suffering and distress. Administration of analgesic agents to animals undergoing surgical procedures is a refinement used to alleviate pain. In this study, a structured literature review was carried out to examine current trends in analgesic administration to rabbits undergoing experimental surgical procedures. 128 papers from 51 peer-reviewed journals were selected for inclusion in this review. Reporting administration of systemic analgesia to rabbits in peer-reviewed scientific papers increased significantly from 16% to 50% between 1995-1997 and 2005-2007 (P < 0.001). Papers that reported ethical approval were more likely than papers that did not specify approval to report systemic analgesic administration (P < 0.001). When systemic analgesics were administered, buprenorphine was the most frequently used agent and non-steroidal anti-inflammatory drugs were used less frequently than opioids in both time periods. Although this review provides evidence that systemic analgesic administration to rabbits undergoing surgical procedures is increasing, rabbits do not always receive analgesia when they undergo experimental surgery. Other practices in rabbit perioperative care that could be improved, highlighted by this survey include: 1) changing the timing of analgesic administration by giving systemic analgesics pre- or perioperatively rather than only postoperatively, 2) using multimodal analgesia when pain is likely to be moderate to severe and 3) increasing the use of non-steroidal anti-inflammatory drugs and use of other techniques such as epidural analgesia particularly for

  14. 14 CFR 406.109 - Administrative law judges-powers and limitations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Administrative law judges-powers and limitations. 406.109 Section 406.109 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION... Rules of Practice in FAA Space Transportation Adjudications § 406.109 Administrative law...

  15. 14 CFR 406.109 - Administrative law judges-powers and limitations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Administrative law judges-powers and limitations. 406.109 Section 406.109 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION... Rules of Practice in FAA Space Transportation Adjudications § 406.109 Administrative law...

  16. 14 CFR 406.109 - Administrative law judges-powers and limitations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Administrative law judges-powers and limitations. 406.109 Section 406.109 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION... Rules of Practice in FAA Space Transportation Adjudications § 406.109 Administrative law...

  17. 14 CFR 406.109 - Administrative law judges-powers and limitations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Administrative law judges-powers and limitations. 406.109 Section 406.109 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION... Rules of Practice in FAA Space Transportation Adjudications § 406.109 Administrative law...

  18. 14 CFR 406.109 - Administrative law judges-powers and limitations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Administrative law judges-powers and limitations. 406.109 Section 406.109 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION... Rules of Practice in FAA Space Transportation Adjudications § 406.109 Administrative law...

  19. Report on Hawaii Geothermal Power Plant Project

    SciTech Connect

    Not Available

    1983-06-01

    The report describes the design, construction, and operation of the Hawaii Geothermal Generator Project. This power plant, located in the Puna District on the island of Hawaii, produces three megawatts of electricity from the steam phase of a geothermal well. (ACR)

  20. Target Report No. 3. Student Voting Power.

    ERIC Educational Resources Information Center

    Jacobson, Dianne, Comp.

    The power of the student vote in 91 Congressional districts where college enrollment exceeds the incumbent's margin of victory in the 1976 elections is presented. The article on student voters included in this report discusses voter registration rates among students, turnout of registered student voters, voting patterns of students, student voting…

  1. 78 FR 9936 - Federal Housing Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ... URBAN DEVELOPMENT Federal Housing Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot... Home Energy Retrofit Loan Pilot Program (Retrofit Pilot Program) known as FHA PowerSaver, which is a.... The Retrofit Pilot Program is authorized by the Energy Innovation Fund of the 2010 Appropriations Act...

  2. National Aeronautics and Space Administration FY 2001 Accountability Report

    NASA Technical Reports Server (NTRS)

    2001-01-01

    The National Aeronautics and Space Administration (NASA) is an independent Agency established to plan and manage the future of the Nation's civil aeronautics and space program. This Accountability Report covers Federal Fiscal Year (FY) 2001 (October 1, 2000, through September 30, 2001), with discussion of some subsequent events The Report contains an overview addressing the Agency's critical programs and financial performance and includes highlights of performance organized by goals and objectives of the Enterprises and Crosscutting Processes. The Report also summarizes NASA's stewardship over budget and financial resources, including audited financial statements and footnotes. The financial statements reflect an overall position of offices and activities, including assets and liabilities, as well as results of operations, pursuant to requirements of Federal law (31 U.S.C. 3515(b)). The auditor's opinions on NASA's financial statements, reports on internal controls, and compliance with laws and regulations are included in this Report.

  3. National Aeronautics and Space Administration FY 2001 Accountability Report

    NASA Technical Reports Server (NTRS)

    2001-01-01

    The National Aeronautics and Space Administration (NASA) is an independent Agency established to plan and manage the future of the Nation's civil aeronautics and space program. This Accountability Report covers Federal Fiscal Year (FY) 2001 (October 1, 2000, through September 30, 2001), with discussion of some subsequent events The Report contains an overview addressing the Agency's critical programs and financial performance and includes highlights of performance organized by goals and objectives of the Enterprises and Crosscutting Processes. The Report also summarizes NASA's stewardship over budget and financial resources, including audited financial statements and footnotes. The financial statements reflect an overall position of offices and activities, including assets and liabilities, as well as results of operations, pursuant to requirements of Federal law (31 U.S.C. 3515(b)). The auditor's opinions on NASA's financial statements, reports on internal controls, and compliance with laws and regulations are included in this Report.

  4. National Aeronautics and Space Administration Fiscal Year 2001 Accountability Report

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The National Aeronautics and Space Administration (NASA) is an independent Agency established to plan and manage the future of the Nation's civil aeronautics and space program. This Accountability Report covers Federal Fiscal Year (FY) 2001 (October 1, 2000, through September 30, 2001), with discussion of some subsequent events. The Report contains an overview addressing the Agency's critical programs and financial performance and includes highlights of performance organized by goals and objectives of the Enterprises and Crosscutting Processes. The Report also summarizes NASA's stewardship over budget and financial resources, including audited financial statements and footnotes. The financial statements reflect an overall position of offices and activities, including assets and liabilities, as well as results of operations, pursuant to requirements of Federal law (31 U.S.C. 3515(b)). The auditor's opinions on NASA's financial statements, reports on internal controls, and compliance with laws and regulations are included in this report.

  5. 36 CFR 1206.45 - What rules govern subgrant distribution, cost sharing, grant administration, and reporting?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... distribution, cost sharing, grant administration, and reporting? 1206.45 Section 1206.45 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES NATIONAL HISTORICAL..., cost sharing, grant administration, and reporting? (a) The Commission will annually establish...

  6. Freeware for reporting radiation dosimetry following the administration of radiopharmaceuticals.

    PubMed

    Gómez Perales, Jesús Luis; García Mendoza, Antonio

    2015-09-01

    This work describes the development of a software application for reporting patient radiation dosimetry following radiopharmaceutical administration. The resulting report may be included within the patient's medical records. The application was developed in the Visual Basic programming language. The dosimetric calculations are based on the values given by the International Commission on Radiological Protection (ICRP). The software is available in both Spanish and English and can be downloaded at no cost from www.radiopharmacy.net. Copyright © 2015 Elsevier Ltd. All rights reserved.

  7. Advanced Power Electronics and Electric Motors Annual Report -- 2013

    SciTech Connect

    Narumanchi, S.; Bennion, K.; DeVoto, D.; Moreno, G.; Rugh, J.; Waye, S.

    2015-01-01

    This report describes the research into advanced liquid cooling, integrated power module cooling, high temperature air cooled power electronics, two-phase cooling for power electronics, and electric motor thermal management by NREL's Power Electronics group in FY13.

  8. National Aeronautics and Space Administration 1999 Accountability Report

    NASA Technical Reports Server (NTRS)

    1999-01-01

    This Accountability Report consolidates reports required by various statutes and summarizes NASA's program accomplishments and its stewardship over budget and financial resources. It is a culmination of NASA's management process, which begins with mission definition and program planning, continues with the formulation and justification of budgets for the President and Congress, and ends with the resulting scientific and engineering program accomplishments. The report covers activities from October 1, 1998, through September 30, 1999, with a discussion of some subsequent events. Program accomplishments included the deployment and operation of the Chandra X-ray Observatory, the delivery of supplies and equipment needed to live and operate on the International Space Station, and the development of the first global 3-D map of Mars. Achievements are highlighted in the Statement of the Administrator and summarized in the performance section of this report.

  9. Accuracy of hospital report cards based on administrative data.

    PubMed

    Glance, Laurent G; Dick, Andrew W; Osler, Turner M; Mukamel, Dana B

    2006-08-01

    Many of the publicly available health quality report cards are based on administrative data. ICD-9-CM codes in administrative data are not date stamped to distinguish between medical conditions present at the time of hospital admission and complications, which occur after hospital admission. Treating complications as preexisting conditions gives poor-performing hospitals "credit" for their complications and may cause some hospitals that are delivering low-quality care to be misclassified as average- or high-performing hospitals. To determine whether hospital quality assessment based on administrative data is impacted by the inclusion of condition present at admission (CPAA) modifiers in administrative data as a date stamp indicator. Retrospective cohort study based on 648,866 inpatient admissions between 1998 and 2000 for coronary artery bypass graft (CABG) surgery, coronary angioplasty (PTCA), carotid endarterectomy (CEA), abdominal aortic aneurysm (AAA) repair, total hip replacement (THR), acute MI (AMI), and stroke using the California State Inpatient Database which includes CPAA modifiers. Hierarchical logistic regression was used to create separate condition-specific risk adjustment models. For each study population, one model was constructed using only secondary diagnoses present at admission based on the CPAA modifier: "date stamp" model. The second model was constructed using all secondary diagnoses, ignoring the information present in the CPAA modifier: the "no date stamp model." Hospital quality was assessed separately using the "date stamp" and the "no date stamp" risk-adjustment models. Forty percent of the CABG hospitals, 33 percent of the PTCA hospitals, 40 percent of the THR hospitals, and 33 percent of the AMI hospitals identified as low-performance hospitals by the "date stamp" models were not classified as low-performance hospitals by the "no date stamp" models. Fifty percent of the CABG hospitals, 33 percent of the PTCA hospitals, 50 percent of

  10. 76 FR 82311 - Food and Drug Administration Transparency Initiative: Food and Drug Administration Report on Good...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... HUMAN SERVICES Food and Drug Administration Food and Drug Administration Transparency Initiative: Food...; Availability AGENCY: Food and Drug Administration, HHS. ACTION: Notice of availability; request for comments. SUMMARY: As part of the Transparency Initiative, the Food and Drug Administration (FDA or Agency) is...

  11. Nicolau syndrome in patient following diclofenac administration: a case report.

    PubMed

    Kim, Kwang-Kyoun

    2011-11-01

    Nicolau syndrome is a rare adverse reaction to a variety of intra-muscular drug preparations. The typical presentation is pain around the injection site soon after injection, followed by erythema, livedoid patch, hemorrhagic patch, and finally, necrosis of skin, subcutaneous fat, and muscle tissue. The phenomenon has been related to the administration of a variety of drugs, including non-steroidal anti-inflammatory drugs, corticosteroids, and penicillin. We report a case with typical features associated with diclofenac injection for pain control in a patient who had undergone bilateral total knee arthroplasty.

  12. Pulsed Power Peer Review Committee Report

    SciTech Connect

    BLOOMQUIST,DOUGLAS D.

    2000-12-01

    In 1993, the Government Performance and Results Act (GPRA, PL 103-62) was enacted. GPRA, which applies to all federal programs, has three components: strategic plans, annual performance plans, and metrics to show how well annual plans are being followed. As part of meeting the GRPA requirement in FY2000, a 14-member external peer review panel (the Garwin Committee) was convened on May 17-19, 2000 to review Sandia National Laboratories' Pulsed Power Programs as a component of the Performance Appraisal Process negotiated with the Department of Energy (DOE). The scope of the review included activities in inertial confinement fission (ICF), weapon physics, development of radiation sources for weapons effects simulation, x-ray radiography, basic research in high energy density physics (HEDP), and pulsed power technology research and development. In his charge to the committee, Jeffrey Quintenz, Director of Pulsed Power Sciences (1600) asked that the review be based on four criteria (1) quality of science, technology, and engineering, (2) programmatic performance, management, and planning, (3) relevance to national needs and agency missions, and (4) performance in the operation and construction of major research facilities. In addition, specific programmatic questions were posed by the director and by the DOE-Defense Programs (DP). The accompanying report, produced as a SAND document, is the report of the committee's findings.

  13. Advances in space power research and technology at the National Aeronautics and Space Administration

    SciTech Connect

    Mullin, J.P.; Randolph, L.P.; Hudson, W.R.; Ambrus, J.H.

    1981-01-01

    The mission of the National Aeronautics and Space Administration's Space Research and Technology Program is to provide a technology base that will adequately support, enhance, or enable current and future activities in the exploration and exploitation of space. This paper summarizes the current status, accomplishments, and goals in the power-system-component areas of photovoltaics, electrochemistry, thermal-to-electric conversion technology, and power management.

  14. Industry disputes administration report on oil and gas leasing

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-05-01

    Despite the Obama administration's efforts to make millions of acres of public lands available for oil and gas development, most of the acreage onshore and offshore of the contiguous United States remains idle, according to “Oil and gas lease utilization, onshore and offshore,” a 15 May report issued by the Department of the Interior (DOI). The report, which is being disputed by industry representatives, notes that 72% of the nearly 36 million leased offshore acres currently are inactive and that 50.6% of onshore leased acres (about 20.8 million acres) also are idle. “As part of the Obama administration's all-of- the-above energy strategy, we continue to make millions of acres of public lands available for safe and responsible domestic energy production on public lands and in federal waters,” said DOI secretary Ken Salazar. “These lands and waters belong to the American people, and they expect those energy supplies to be developed in a timely and responsible manner and with a fair return to taxpayers. We will continue to encourage companies to diligently bring production online quickly and safely on public lands already under lease.”

  15. Rapporteur report: MHD electric power plants

    NASA Technical Reports Server (NTRS)

    Seikel, G. R.

    1980-01-01

    Five US papers from the Proceedings of the Seventh International Conference on MHD Electrical Power Generation at the Massachusetts Institute of Technology are summarized. Results of the initial parametric phase of the US effort on the study of potential early commercial MHD plants are reported and aspects of the smaller commercial prototype plant termed the Engineering Test Facility are discussed. The alternative of using a disk geometry generator rather than a linear generator in baseload MHD plants is examined. Closed-cycle as well as open-cycle MHD plants are considered.

  16. Relationships between Western Area Power Administration`s power marketing program and hydropower operations at Salt Lake City area integrated projects

    SciTech Connect

    Veselka, T.D.; Folga, S.; Poch, L.A.

    1995-03-01

    This technical memorandum provides background information on the Western Area Power Administration (Western) and the physical characteristics of the Salt Lake City Area Integrated Projects (SLCA/IP) hydropower plants, which include the Colorado River Storage Project, the Rio Grande Project, and the Collbran Project. In addition, the history, electrical capacity, storage capacity, and flow restrictions at each dam are presented. An overview of Western`s current programs and services, including a review of statutory authorities, agency discretion, and obligations, is also provided. The variability of SLCA/IP hourly generation under various alternative marketing strategies and purchasing programs is discussed. The effects of Western`s services, such as area load control, outage assistance, and transmission, on SLCA/IP power plant operations are analyzed.

  17. Relationship between School Administrators' Organizational Power Sources and Teachers' Organizational Citizenship Behaviors

    ERIC Educational Resources Information Center

    Altinkurt, Yahya; Yilmaz, Kursad

    2012-01-01

    The main purpose of the research was to determine correlation between school administrators' organizational power sources and teachers' organizational citizenship behaviors in primary schools. The research was a correlational survey model study. 275 participants were randomly chosen for the research. The data were collected by…

  18. The Prediction Power of Servant and Ethical Leadership Behaviours of Administrators on Teachers' Job Satisfaction

    ERIC Educational Resources Information Center

    Güngör, Semra Kiranli

    2016-01-01

    The purpose of this study is to identify servant leadership and ethical leadership behaviors of administrators and the prediction power of these behaviors on teachers' job satisfaction according to the views of schoolteachers. This research, figured in accordance with the quantitative research processes. The target population of the research has…

  19. 78 FR 39279 - United States Department of Energy; Bonneville Power Administration; Notice of Petition for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ... [Federal Register Volume 78, Number 126 (Monday, July 1, 2013)] [Notices] [Pages 39279-39280] [FR Doc No: 2013-15665] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ13-10-000] United States Department of Energy; Bonneville Power Administration; Notice of Petition for...

  20. 77 FR 21764 - United States Department of Energy and Bonneville Power Administration; Notice of Petition for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission United States Department of Energy and Bonneville Power Administration; Notice of Petition for Declaratory Order Take notice that on March 29, 2012, pursuant to sections...

  1. Collaborative Power: A Grounded Theory of Administrative Instructional Leadership in the Elementary School.

    ERIC Educational Resources Information Center

    Harchar, Rayma L.

    Findings of a study that examined the key elements necessary for administrative instructional leadership in elementary schools are presented in this paper, with a focus on the conflict between the use of power and collaboration. Interviews were conducted with 8 elementary school principals (3 men and 5 women) who were identified as exemplary…

  2. Planning the School Administration Center. Report of the AASA Commission on School Administration Buildings.

    ERIC Educational Resources Information Center

    American Association of School Administrators, Washington, DC.

    Guidelines are set down for school administrators, architects, board members, and others responsible for the planning, design, and construction of administrative facilities for the schools of their districts. The need for carefully planned, functional school administration centers is evident. This publication will assist communities of people to…

  3. Southwestern Power Administration site environmental report for calendar year 1993

    SciTech Connect

    Not Available

    1994-06-01

    During CY 93, Southwestern was not involved in any programs that had a direct effect on the environment, involving endangered species, protection of wetlands, or increased electromagnetic radiation. Southwestern continued to function throughout the year in an operations and maintenance posture with minor substation projects. Southwestern received an environmental management audit by the Department of Energy`s Office of Environmental Audit (EH-24), during CY 1992. The purpose of the audit was to give Southwestern, DOE headquarters, and the Secretary an indication of the status of Southwestern management`s effectiveness in discharging its duties in an environmentally responsible manner. The audit identified 17 findings. An action plan was developed and remediation of the findings has been accomplished. Several strengths were identified during the audit with regard to the environmental programs at Southwestern. Most importantly, senior management at Southwestern has taken actions to increase environmental awareness throughout the organization which is evidenced by the creation of the Environmental, Safety, Health, and Security Office.

  4. 2007 Wholesale Power Rate Adjustment Proceeding (WP-07) : Administrator's Final Record of Decision.

    SciTech Connect

    United States. Bonneville Power Administration.

    2006-07-01

    This Record of Decision (ROD) contains the decisions of the Bonneville Power Administration (BPA), based on the record compiled in this rate proceeding, with respect to the adoption of power rates for the three-year rate period commencing October 1, 2006, through September 30, 2009. This ''2007 Wholesale Power Rate Adjustment Proceeding'' is designed to establish replacement rate schedules and General Rate Schedule Provisions (GRSPs) for those that expire on September 30, 2006. This power rate case also establishes the General Transfer Agreement (GTA) Delivery Charge for the period of October 1, 2007, through September 30, 2009. BPA's Power Subscription Strategy and Record of Decision (Subscription Strategy), as well as other Agency processes, provide much of the policy context for this rate case and are described in Section 2. This ROD follows a full evidentiary hearing and briefing, including an Oral Argument before the BPA Administrator. Sections 3 through 18, including any appendices or attachments, present the issues raised by parties in this proceeding, the parties positions, BPA staff positions on the issues, BPA's evaluations of the positions, and the Administrator's decisions. Parties had the opportunity to file briefs on exceptions to the Draft ROD, before issuance of this Final Record of Decision.

  5. 22 CFR 128.9 - Proceedings before and report of Administrative Law Judge.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Proceedings before and report of Administrative... REGULATIONS ADMINISTRATIVE PROCEDURES § 128.9 Proceedings before and report of Administrative Law Judge. (a..., will prepare a written report. The report will include findings of fact, findings of law, a finding...

  6. Knowledge of food and drug administration reportable deviations.

    PubMed

    Lam, Rebecca; Bryant, Barbara J

    2011-07-01

    As early as 2001, the Food and Drug Administration (FDA) required blood centers and hospital transfusion services to report events associated with testing, storage, or distribution of blood products that deviated from current good manufacturing practices or affected the safety, purity, or potency of the product. Between 2004 and 2009, an average of only 8.6% of hospitals reported blood product deviations. Case scenarios designed to evaluate knowledge of FDA reportable deviations were developed and sent for evaluation to the Center for Biologics Evaluation and Research (CBER) and FDA division directors for FDA reportable deviations. A final survey containing eight cases was launched in a web-based online survey tool and sent to blood bank medical technologists. Additional information was queried regarding job title/responsibilities and the size of the blood center and/or transfusion service. There were 176 respondents to the survey. Only 5.7% (10/176) answered all questions correctly. Analysis by job title and place of employment revealed no correlation to the number of correct responses. More importance was attached to deviations involving quality control, blood bank identification, unit specifications, and antibody identification. Less importance was attached to deviations involving phlebotomist's initials, failure to issue units in the computer, and using a recent sample from a previous hospitalization. This study revealed that blood bankers did not have clear understanding of what constituted an FDA reportable occurrence. Size or type of blood establishment or individual job title was not associated with more knowledge of FDA reportable deviations. © 2011 American Association of Blood Banks.

  7. SPS energy conversion and power management workshop. Final report

    SciTech Connect

    Not Available

    1980-06-01

    In 1977 a four year study, the concept Development and Evaluation Program, was initiated by the US Department of Energy and the National Aeronautics and Space Administration. As part of this program, a series of peer reviews were carried out within the technical community to allow available information on SPS to be sifted, examined and, if need be, challenged. The SPS Energy Conversion and Power Management Workshop, held in Huntsville, Alabama, February 5 to 7, 1980, was one of these reviews. The results of studies in this particular field were presented to an audience of carefully selected scientists and engineers. This first report summarizes the results of that peer review. It is not intended to be an exhaustive treatment of the subject. Rather, it is designed to look at the SPS energy conversion and power management options in breadth, not depth, to try to foresee any troublesome and/or potentially unresolvable problems and to identify the most promising areas for future research and development. Topics include photovoltaic conversion, solar thermal conversion, and electric power distribution processing and power management. (WHK)

  8. Summary Report of the NASA Management Study Group: Recommendations to the Administrator, National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Phillips, Samuel C.

    1986-01-01

    The NASA Management Study Group (NMSG) was established under the auspices of the National Acedamy of Public Administration at the request of the Administrator of NASA to assess NASA's management practices and to evaluate the effectiveness of the NASA organization. This report summarizes the conclusions and recommendations of the NMSG on the overall management and organization of NASA.

  9. Impacts of Western Area Power Administration`s power marketing alternatives on utility demand-side management and conservation and renewable energy programs

    SciTech Connect

    Cavallo, J.D.; Germer, M.F.; Tompkins, M.M.

    1995-03-01

    The Western Area Power Administration (Western) requires all of its long-term firm power customers to implement programs that promote the conservation of electric energy or facilitate the use of renewable energy resources. Western has also proposed that all customers develop integrated resource plans that include cost-effective demand-side management programs. As part of the preparation of Western`s Electric Power Marketing Environmental Impact Statement, Argonne National Laboratory (ANL) developed estimates of the reductions in energy demand resulting from Western`s conservation and renewable energy activities in its Salt Lake City Area Office. ANL has also estimated the energy-demand reductions from cost-effective, demand-side management programs that could be included in the integrated resource plans of the customers served by Western`s Salt Lake City Area Office. The results of this study have been used to adjust the expected hourly demand for Western`s major systems in the Salt Lake City Area. The expected hourly demand served as the basis for capacity expansion plans develops with ANL`s Production and Capacity Expansion (PACE) model.

  10. Follow-up process evaluation of Bonneville Power Administration's energy savings plan program

    SciTech Connect

    Jennings, J.G.; Peters, J.S. )

    1990-01-01

    The Energy $avings Plan (E$P) program has been operated by the Bonneville Power Administration (Bonneville) since late fall 1987. The program is designed to build capability in the acquisition of conservation resources in the non-aluminum industrial sector in the Pacific Northwest. According to the Northwest Power Planning Council, the non-aluminum industrial sector accounts for about 23% of the total regional electricity consumption. Five non-aluminum industries consume 85% of this total. Three major industries --- chemical producers, pulp and paper plants, and lumber mills --- account for around 68% of non-aluminum industrial consumption (i.e., 16% of the total regional electricity consumption). 1 ref.

  11. 77 FR 31396 - Reports of Injuries to Employees Operating Mechanical Power Presses; Extension of the Office of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... Occupational Safety and Health Administration Reports of Injuries to Employees Operating Mechanical Power... Employees Operating Mechanical Power Presses (29 CFR 1910.217(g)). DATES: Comments must be submitted... information (29 U.S.C. 657). In the event a worker is injured while operating a mechanical power press, 29 CFR...

  12. Space Solar Power Program. Final report

    SciTech Connect

    Arif, Humayun; Barbosa, Hugo; Bardet, Christophe; Baroud, Michel; Behar, Alberto; Berrier, Keith; Berthe, Phillipe; Bertrand, Reinhold; Bibyk, Irene; Bisson, Joel; Bloch, Lawrence; Bobadilla, Gabriel; Bourque, Denis; Bush, Lawrence; Carandang, Romeo; Chiku, Takemi; Crosby, Norma; De Seixas, Manuel; De Vries, Joha; Doll, Susan; Dufour, Francois; Eckart, Peter; Fahey, Michael; Fenot, Frederic; Foeckersperger, Stefan; Fontaine, Jean-Emmanuel; Fowler, Robert; Frey, Harald; Fujio, Hironobu; Gasa, Jaume Munich; Gleave, Janet; Godoe, Jostein; Green, Iain; Haeberli, Roman; Hanada, Toshiya; Harris, Peter; Hucteau, Mario; Jacobs, Didier Fernand; Johnson, Richard; Kanno, Yoshitsugu; Koenig, Eva Maria; Kojima, Kazuo; Kondepudi, Phani; Kottbauer, Christian; Kulper, Doede; Kulagin, Konstantin; Kumara, Pekka; Kurz, Rainer; Laaksonen, Jyrki; Lang, Andrew Neill; Lathan, Corinna; Le Fur, Thierry; Lewis, David; Louis, Alain; Mori, Takeshi; Morlanes, Juan; Murbach, Marcus; Nagatomo, Hideo; O'brien, Ivan; Paines, Justin; Palaszewski, Bryan; Palmnaes, Ulf; Paraschivolu, Marius; Pathare, Asmin; Perov, Egor; Persson, Jan; Pessoa-Lopes, Isabel; Pinto, Michel; Porro, Irene; Reichert, Michael; Ritt-Fischer, Monika; Roberts, Margaret; Robertson II, Lawrence; Rogers, Keith; Sasaki, Tetsuo; Scire, Francesca; Shibatou, Katsuya; Shirai, Tatsuya; Shiraishi, Atsushi; Soucaille, Jean-Francois; Spivack, Nova; St. Pierre, Dany; Suleman, Afzal; Sullivan, Thomas; Theelen, Bas Johan; Thonstad, Hallvard; Tsuji, Masatoshi; Uchiumi, Masaharu; Vidqvist, Jouni; Warrell, David; Watanabe, Takafumi; Willis, Richard; Wolf, Frank; Yamakawa, Hiroshi; Zhao, Hong

    1992-08-01

    Information pertaining to the Space Solar Power Program is presented on energy analysis; markets; overall development plan; organizational plan; environmental and safety issues; power systems; space transportation; space manufacturing, construction, operations; design examples; and finance.

  13. Forty-Fourth Annual Report of the National Advisory Committee for Aeronautics Administrative Report Including Technical Reports Nos. 1342 to 1392

    NASA Technical Reports Server (NTRS)

    1959-01-01

    In accordance with act of Congress, approved March 3, 1915, as amended (U.S.C., title 50, .sw 151), which established the National Advisory Committee for Aeronautics, the Committee submits its Forty-fourth Annual Report for the fiscal year 1958. This is the Committee's final report to the Congress. The National Aeronautics and Space Act of 1958 (Public Law 85-568) provides in section 301 that the NACA "shall cease to exist" and "all functions, powers, duties, and obligations, and all real and personal property, personnel (other than members of the Committee), funds, and records of the NACA shall be transferred to the National Aeronautics and Space Administration. The aforesaid act provides that "this section shall take effect 90 days after the date of the enactment of this act, or on any earlier date on which the Administrator shall determining and announce by proclamation published in the Federal Register, that the Administration has been organized and is prepared to discharge the duties and exercise the power conferred upon it by this act." The Administrator, Hon. T. Keith Glennan has advised the Committee of his intention to issue such proclamation, effective October 1,1958.

  14. Power Systems of the Future: A 21st Century Power Partnership Thought Leadership Report (Fact Sheet)

    SciTech Connect

    Not Available

    2015-01-01

    Powerful trends in technology, policy environments, financing, and business models are driving change in power sectors globally. In light of these trends, the question is no longer whether power systems will be transformed, but rather how these transformations will occur. Power Systems of the Future, a thought leadership report from the 21st Century Power Partnership, explores these pathways explores actions that policymakers and regulators can take to encourage desired power system outcomes.

  15. Class 1 overview of cultural resources for the Western Area Power Administration Salt Lake City Area Integrated Projects electric power marketing environmental impact statement

    SciTech Connect

    Moeller, K.L.; Malinowski, L.M.; Hoffecker, J.F.; Walitschek, D.A.; Shogren, L.; Mathews, J.E.; Verhaaren, B.T.

    1993-11-01

    Argonne National Laboratory conducted an inventory of known archaeological and historic sites in areas that could be affected by the hydropower operation alternatives under analysis in the power marketing environmental impact statement for the Western Area Power Administration`s Salt Lake City Area Integrated Projects. The study areas included portions of the Green River (Flaming Gorge Dam to Cub Creek) in Utah and Colorado and the Gunnison River (Blue Mesa Reservoir to Crystal Dam) in Colorado. All previous archaeological surveys and previously recorded prehistoric and historic sites, structures, and features were inventoried and plotted on maps (only survey area maps are included in this report). The surveys were classified by their level of intensity, and the sites were classified according to their age, type, and contents. These data (presented here in tabular form) permit a general assessment of the character and distribution of archaeological remains in the study areas, as well as an indication of the sampling basis for such an assessment. To provide an adequate context for the descriptions of the archaeological and historic sites, this report also presents overviews of the environmental setting and the regional prehistory, history, and ethnography for each study area.

  16. Proposed framework for the Western Area Power Administration Environmental Risk Management Program

    SciTech Connect

    Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J.; Roybal, A.L.

    1994-12-01

    The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

  17. Resource Sharing in Higher Education: Home Economics Administrators' Report.

    ERIC Educational Resources Information Center

    Ley, Connie; Webb-Lupo, Anita

    1988-01-01

    A total of 117 members of the National Council of Administrators of Home Economics completed the Resource Sharing Inventory. Forty-five percent provide some examples of how their department shared resources with other departments. Administrator attitude was the factor identified as most likely to encourage resource sharing. (CH)

  18. 29 CFR 102.35 - Duties and powers of administrative law judges; stipulations of cases to administrative law...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... consolidated or severed prior to issuance of administrative law judge decisions; (9) To approve stipulations, including stipulations of facts that waive a hearing and provide for a decision by the administrative law judge. Alternatively, the parties may agree to waive a hearing and decision by an administrative law...

  19. 29 CFR 102.35 - Duties and powers of administrative law judges; stipulations of cases to administrative law...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... consolidated or severed prior to issuance of administrative law judge decisions; (9) To approve stipulations, including stipulations of facts that waive a hearing and provide for a decision by the administrative law judge. Alternatively, the parties may agree to waive a hearing and decision by an administrative...

  20. 29 CFR 102.35 - Duties and powers of administrative law judges; stipulations of cases to administrative law...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... consolidated or severed prior to issuance of administrative law judge decisions; (9) To approve stipulations, including stipulations of facts that waive a hearing and provide for a decision by the administrative law judge. Alternatively, the parties may agree to waive a hearing and decision by an administrative...

  1. 29 CFR 102.35 - Duties and powers of administrative law judges; stipulations of cases to administrative law...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... consolidated or severed prior to issuance of administrative law judge decisions; (9) To approve stipulations, including stipulations of facts that waive a hearing and provide for a decision by the administrative law judge. Alternatively, the parties may agree to waive a hearing and decision by an administrative...

  2. Demonstration Assessment of Light-Emitting Diode (LED) Retrofit Lamps at the Lobby of the Bonneville Power Administration, Portland, OR

    SciTech Connect

    Miller, Naomi

    2011-07-01

    This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in the lobby of the Bonneville Power Administration (BPA) headquarters building in Portland, Oregon. The project involved a simple retrofit of 32 track lights used to illuminate historical black-and-white photos and printed color posters from the 1930s and 1940s. BPA is a federal power marketing agency in the Northwestern United States, and selected this prominent location to demonstrate energy efficient light-emitting diode (LED) retrofit options that not only can reduce the electric bill for their customers but also provide attractive alternatives to conventional products, in this case accent lighting for BPA's historical artwork.

  3. Teacher-Administrator Ratios: A Decade of Change. BCTF Research Report. Section IV. 2009-TD-01

    ERIC Educational Resources Information Center

    White, Margaret

    2009-01-01

    This research report examines changes in FTE teachers, FTE administrators, and teacher-administrator ratios, drawing on two data sources over two time periods. The Ministry of Education collects statistics about administrators from two different data sources. Teacher Statistics, an annual report published by the ministry uses data collected in…

  4. Citalopram: differential sleep/wake and EEG power spectrum effects after single dose and chronic administration.

    PubMed

    Neckelmann, D; Bjorvatn, B; Bjørkum, A A; Ursin, R

    1996-09-01

    The sleep/wake effects of the selective serotonin re-uptake inhibitor citalopram were studied in both a single-dose study with three dose levels (0.5, 2.0 and 5.0 mg/kg), and a 5-week chronic administration study (15 mg/kg/24 h). Single doses of citalopram resulted in a dose-dependent inhibition of rapid eye movement (REM) sleep. After chronic citalopram treatment there was a sustained REM sleep inhibition. Single doses of citalopram resulted in only minor changes in non-REM (NREM) sleep as well as in NREM EEG power spectral density. Chronic administration resulted in a major shift from SWS-2 to SWS-1. The observed corresponding changes in EEG power density were regional. A 30 to 40 percent reduction of power density in the 0.5-15 Hz range in the fronto-parietal EEG derivation was seen for the whole 8-h registration period. In the fronto-frontal EEG derivation only minor changes were seen. A decreasing trend in NREM sleep power density between 0.5 and 7 Hz, usually seen during the course of the light period, was not observed in the chronic condition, but was seen in control and single-dose condition, suggesting altered diurnal distribution of slow wave activity in the chronic condition. The data indicate that acute and chronic administration of citalopram shows clear differences in sleep effect, which may be caused by alteration of serotonergic transmission, and may be related to the antidepressant effect.

  5. Report: Office of Research and Development Needs to Improve Its Method of Measuring Administrative Savings

    EPA Pesticide Factsheets

    Report #11-P-0333, July 14, 2011. ORD’s efforts to reduce its administrative costs are noteworthy, but ORD needs to improve its measurement mechanism for assessing the effectiveness of its initiatives to reduce administrative costs.

  6. Health Services Management in the Health Administration Curriculum. Report by the Curriculum Task Force on Administration.

    ERIC Educational Resources Information Center

    Association of Univ. Programs in Health Administration, Washington, DC.

    Critical decisions that need to be made by faculties of health administration education programs when developing and assessing the health services management portion of the curriculum are identified. Decisions should draw from the information available concerning professional target roles of graduates, graduate behavior expected, resources for…

  7. Fire Organization and Administration: Report of Futuring Group 3

    Treesearch

    1987-01-01

    Futuring Group 3 identified 12 trends that determine the way fire administrators must plan and budget for efficient wildland/urban fire protection organizations in the future. Five key visions and associated strategies were also identified.

  8. Coping Power. What Works Clearinghouse Intervention Report

    ERIC Educational Resources Information Center

    What Works Clearinghouse, 2011

    2011-01-01

    "Coping Power" is based on the earlier "Anger Coping Power" program. It emphasizes social and emotional skills that are needed during the transition to middle school. The program incorporates child and parent components. The child component consists of thirty-four 50-minute group sessions and periodic individual sessions over…

  9. Alpha and beta EEG power reflects L-dopa acute administration in parkinsonian patients

    PubMed Central

    Melgari, Jean-Marc; Curcio, Giuseppe; Mastrolilli, Francesca; Salomone, Gaetano; Trotta, Laura; Tombini, Mario; di Biase, Lazzaro; Scrascia, Federica; Fini, Rita; Fabrizio, Emma; Rossini, Paolo Maria; Vernieri, Fabrizio

    2014-01-01

    Aim: To evaluate the effect of an acute L-dopa administration on eye-closed resting state electroencephalographic (EEG) activity of cognitively preserved Parkinsonian patients. Methods: We examined 24 right-handed patients diagnosed as uncomplicated probable Parkinson’s disease (PD). Each patient underwent Unified Parkinson’s Disease Rating Scale (UPDRS)-part-III evaluation before and 60 min after an oral load of L-dopa-methyl-ester/carbidopa 250/25 mg. Resting condition eyes-closed EEG data were recorded both pre- and post L-dopa load. Absolute EEG power values were calculated at each scalp derivation for Delta, Theta, Alpha and Beta frequency bands. UPDRS scores (both global and subscale scores) and EEG data (power values of different frequency bands for each scalp derivation) were submitted to a statistical analysis to compare Pre and Post L-Dopa conditions. Finally, a correlation analysis was carried out between EEG spectral content and UPDRS scores. Results: Considering EEG power spectral analysis, no statistically significant differences arose on Delta and Theta bands after L-dopa intake. Conversely, Alpha and Beta rhythms significantly increased on centro-parietal scalp derivations, as a function of L-dopa administration. Correlation analysis indicated a significant negative correlation between Beta power increase on centro-parietal areas and UPDRS subscores (Rigidity of arms and Bradykinesia). A minor significant negative correlation was also found between Alpha band increase and resting tremor. Conclusions: Assuming that a significant change in EEG power spectrum after L-dopa intake may be related to dopaminergic mechanisms, our findings are consistent with the hypothesis that dopaminergic defective networks are implicated in cortical oscillatory abnormalities at rest in non-demented PD patients. PMID:25452725

  10. Early utility experience with wind power generation. Volume 1. Summary report. Final report

    SciTech Connect

    McCabe, T.; Henry, G.; Tennis, M.; Goldenblatt, M.

    1984-01-01

    This report is one of three presenting the results of EPRI Research Project 1590-1, Evaluation of Electric Utility Experience with Wind Power Generation. The objective of this project was to develop an improved understanding of wind power generation, in particular the process a utility must undergo to initiate and carry out a wind turbine project. The primary tasks of RP1590-1 were to document and evaluate the experience of two utilities with megawatt-scale wind turbine installations from project inception to the first rotation of the wind turbine. This summary report presents in brief form the experiences of two utilities, the Pacific Gas and Electric Company and the Bonneville Power Administration, with wind turbine projects at Solano County, California and Goodnoe Hills, Washington, respectively. All documents and reports pertaining to the experiences with the wind turbine projects were reviewed and excerpts made of the highlights. Gaps in the documentation were filled by talking with appropriate people. Site visits were conducted to monitor current activity. The information obtained was evaluated for its generic relevance and benefit to other utilities. Condensed descriptions of the projects, a comparison of the projects, and highlights of the utilities' experiences are presented. Some of the insights which might benefit other utility wind programs are identified.

  11. Analysis of automated external defibrillator device failures reported to the Food and Drug Administration.

    PubMed

    DeLuca, Lawrence A; Simpson, Allan; Beskind, Dan; Grall, Kristi; Stoneking, Lisa; Stolz, Uwe; Spaite, Daniel W; Panchal, Ashish R; Denninghoff, Kurt R

    2012-02-01

    Automated external defibrillators are essential for treatment of cardiac arrest by lay rescuers and must determine when to shock and if they are functioning correctly. We seek to characterize automated external defibrillator failures reported to the Food and Drug Administration (FDA) and whether battery failures are properly detected by automated external defibrillators. FDA adverse event reports are catalogued in the Manufacturer and User Device Experience (MAUDE) database. We developed and internally validated an instrument for analyzing MAUDE data, reviewing all reports in which a fatality occurred. Two trained reviewers independently analyzed each report, and a third resolved discrepancies or passed them to a committee for resolution. One thousand two hundred eighty-four adverse events were reported between June 1993 and October 2008, of which 1,150 were failed defibrillation attempts. Thirty-seven automated external defibrillators never powered on, 252 failed to complete rhythm analysis, and 524 failed to deliver a recommended shock. In 149 cases, the operator disagreed with the device's rhythm analysis. In 54 cases, the defibrillator stated the batteries were low and in 110 other instances powered off unexpectedly. Interrater agreement between reviewers 1 and 2 ranged by question from 69.0% to 98.6% and for most likely cause was 55.9%. Agreement was obtained for 93.7% to 99.6% of questions by the third reviewer. Remaining discrepancies were resolved by the arbitration committee. MAUDE information is often incomplete and frequently no corroborating data are available. Some conditions not detected by automated external defibrillators during self-test cause units to power off unexpectedly, causing defibrillation delays. Backup units frequently provide shocks to patients. Copyright © 2011 American College of Emergency Physicians. Published by Mosby, Inc. All rights reserved.

  12. Report on audit of funding for advanced radioisotope power systems

    SciTech Connect

    1997-10-17

    The U.S. Department of Energy`s (Department) Advanced Radioisotope Power Systems Program maintains the sole national capability and facilities to produce radioisotope power systems for the National Aeronautics and Space Administration (NASA), the Department of Defense, and other Federal agencies. Projects are conducted with these agencies in accordance with written agreements and are dependent on cost sharing by the user agencies. For the past seven years the program emphasis has been on providing power systems for NASA`s Cassini mission to Saturn, which was launched earlier this month. We initiated this audit to determine whether the Department received proper reimbursement from NASA for the radioisotope power systems produced.

  13. Air quality analysis and related risk assessment for the Bonneville Power Administration's Resource Program Environmental Impact Statement

    SciTech Connect

    Glantz, C S; Burk, K W; Driver, C J; Liljegren, J C; Neitzel, D A; Schwartz, M N; Dana, M T; Laws, G L; Mahoney, L A; Rhoads, K

    1992-04-01

    The Bonneville Power Administration (BPA) is considering 12 different alternatives for acquiring energy resources over the next 20 years. Each of the alternatives utilizes a full range of energy resources (e.g., coal, cogeneration, conservation, and nuclear); however, individual alternatives place greater emphases on different types of power-producing resources and employ different timetables for implementing these resources. The environmental impacts that would result from the implementation of each alternative and the economic valuations of these impacts, will be an important consideration in the alternative selection process. In this report we discuss the methods used to estimate environmental impacts from the resource alternatives. We focus on pollutant emissions rates, ground-level air concentrations of basic criteria pollutants, the acidity of rain, particulate deposition, ozone concentrations, visibility attenuation, global warming, human health effects, agricultural and forest impacts, and wildlife impacts. For this study, pollutant emission rates are computed by processing BPA data on power production and associated pollutant emissions. The assessment of human health effects from ozone indicated little variation between the resource alternatives. Impacts on plants, crops, and wildlife populations from power plant emissions are projected to be minimal for all resource alternatives.

  14. Multi Megawatt Power System Analysis Report

    SciTech Connect

    Longhurst, Glen Reed; Harvego, Edwin Allan; Schnitzler, Bruce Gordon; Seifert, Gary Dean; Sharpe, John Phillip; Verrill, Donald Alan; Watts, Kenneth Donald; Parks, Benjamin Travis

    2001-11-01

    Missions to the outer planets or to near-by planets requiring short times and/or increased payload carrying capability will benefit from nuclear power. A concept study was undertaken to evaluate options for a multi-megawatt power source for nuclear electric propulsion. The nominal electric power requirement was set at 15 MWe with an assumed mission profile of 120 days at full power, 60 days in hot standby, and another 120 days of full power, repeated several times for 7 years of service. Of the numerous options considered, two that appeared to have the greatest promise were a gas-cooled reactor based on the NERVA Derivative design, operating a closed cycle Brayton power conversion system; and a molten lithium-cooled reactor based on SP-100 technology, driving a boiling potassium Rankine power conversion system. This study examined the relative merits of these two systems, seeking to optimize the specific mass. Conclusions were that either concept appeared capable of approaching the specific mass goal of 3-5 kg/kWe estimated to be needed for this class of mission, though neither could be realized without substantial development in reactor fuels technology, thermal radiator mass efficiency, and power conversion and distribution electronics and systems capable of operating at high temperatures. Though the gas-Brayton systems showed an apparent advantage in specific mass, differences in the degree of conservatism inherent in the models used suggests expectations for the two approaches may be similar. Brayton systems eliminate the need to deal with two-phase flows in the microgravity environment of space.

  15. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    SciTech Connect

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  16. NASA Administrator Visits Ames Research Center (Reporter Pkg - May 2013)

    NASA Image and Video Library

    2013-05-24

    NASA Administrator Charles Bolden and Congressman Mike Honda (D-San Jose, CA) were special guests at Ames Research Center recently. During their visit, they visited the SpaceShop, where they were shown demonstrations of Ames' contributions to the PhoneSat nano-satellite mission and 3D printing activity

  17. Ocean Current Power Generator. Final Report

    SciTech Connect

    O'Sullivan, G. A.

    2002-07-26

    The Ocean Power Generator is both technically and economically suitable for deployment in the Gulf Stream from the US Navy facility in Dania, Florida. Yet to be completed is the calibration test in the Chesapeake Bay with the prototype dual hydroturbine Underwater Electric Kite. For the production units a revised design includes two ballast tanks mounted as pontoons to provide buoyancy and depth control. The power rating of the Ocean Power Generator has been doubled to 200 kW ready for insertion into the utility grid. The projected cost for a 10 MW installation is $3.38 per watt, a cost that is consistent with wind power pricing when it was in its deployment infancy, and a cost that is far better than photovoltaics after 25 years of research and development. The Gulf Stream flows 24 hours per day, and water flow is both environmentally and ecologically perfect as a renewable energy source. No real estate purchases are necessary, and you cannot see, hear, smell, or touch an Ocean Power Generator.

  18. Apollo experience report: Power generation system

    NASA Technical Reports Server (NTRS)

    Bell, D., III; Plauche, F. M.

    1973-01-01

    A comprehensive review of the design philosophy and experience of the Apollo electrical power generation system is presented. The review of the system covers a period of 8 years, from conception through the Apollo 12 lunar-landing mission. The program progressed from the definition phase to hardware design, system development and qualification, and, ultimately, to the flight phase. Several problems were encountered; however, a technology evolved that enabled resolution of the problems and resulted in a fully manrated power generation system. These problems are defined and examined, and the corrective action taken is discussed. Several recommendations are made to preclude similar occurrences and to provide a more reliable fuel-cell power system.

  19. Space Power Facility Reverberation Chamber Calibration Report

    NASA Technical Reports Server (NTRS)

    Lewis, Catherine C.; Dolesh, Robert J.; Garrett, Michael J.

    2014-01-01

    This document describes the process and results of calibrating the Space Environmental Test EMI Test facility at NASA Plum Brook Space Power Facility according to the specifications of IEC61000-4-21 for susceptibility testing from 100 MHz to 40 GHz. The chamber passed the field uniformity test, in both the empty and loaded conditions, making it the world's largest Reverberation Chamber.

  20. Report on Hawaii geothermal power plant project

    SciTech Connect

    Not Available

    1983-06-01

    The Hawaii Geothermal Generator Project is the first power plant in the State of Hawaii to be powered by geothermal energy. This plant, which is located in the Puna District on the Island of Hawaii, produces three (3) megawatts of electricity utilizing the steam phase from the geothermal well. This project represents the climax of the geophysical research efforts going on for two decades in the Hawaiian Islands which resulted in the discovery of a significant reservoir of geothermal energy which could be put to practical use. In 1978 the Department of Energy, in conjunction with the State of Hawaii, entered into negotiations to design and build a power plant. The purpose and objective of this plant was to demonstrate the feasibility of constructing and operating a geothermal power plant located in a remote volcanically active area. A contract was signed in mid 1978 between the Research Corporation of the University of Hawaii (RCUH) and the Department of Energy (DOE). To date, the DOE has provided 8.3 million dollars with the State of Hawaii and others contributing 2.1 million dollars. The cost of the project exceeded its original estimates by approximately 25%. These increases in cost were principally contributed to the higher cost for construction than was originally estimated. Second, the cost of procuring the various pieces of equipment exceed their estimates by 10 to 20 percent, and third, the engineering dollar per man hour rose 20 to 25 percent.

  1. Manzanita Hybrid Power system Project Final Report

    SciTech Connect

    Trisha Frank

    2005-03-31

    The Manzanita Indian Reservation is located in southeastern San Diego County, California. The Tribe has long recognized that the Reservation has an abundant wind resource that could be commercially utilized to its benefit, and in 1995 the Tribe established the Manzanita Renewable Energy Office. Through the U.S. Department of Energy's Tribal Energy Program the Band received funds to install a hybrid renewable power system to provide electricity to one of the tribal community buildings, the Manzanita Activities Center (MAC building). The project began September 30, 1999 and was completed March 31, 2005. The system was designed and the equipment supplied by Northern Power Systems, Inc, an engineering company with expertise in renewable hybrid system design and development. Personnel of the National Renewable Energy Laboratory provided technical assistance in system design, and continued to provide technical assistance in system monitoring. The grid-connected renewable hybrid wind/photovoltaic system provides a demonstration of a solar/wind energy hybrid power-generating project on Manzanita Tribal land. During the system design phase, the National Renewable Energy Lab estimated that the wind turbine is expected to produce 10,000-kilowatt hours per year and the solar array 2,000-kilowatt hours per year. The hybrid system was designed to provide approximately 80 percent of the electricity used annually in the MAC building. The project proposed to demonstrate that this kind of a system design would provide highly reliable renewable power for community uses.

  2. Administratively required dental radiographs: radiation recommendation series. Final report

    SciTech Connect

    Not Available

    1981-09-01

    This publication is part of the continuing Radiation Recommendation Series published by the Bureau of Radiological Health. This Series was established to provide physicians, medical physicists, technologists, and others involved in the radiological process with guidance on appropriate radiological health principles in the medical radiation area. Administrative requirements for radiographs are found in many segments of the United States health care system. Such requirements are not intrinsically bad. If the resulting x-ray examinations provide a net public health benefit, they are certainly justified. However, where such examinations do not benefit the care and management of the patient, the requirements should be reviewed to determine whether they can be eliminated. This document presents an FDA radiation recommendation on administratively required dental x-ray examinations. In general such examinations are not requested to further the patient's dental health, but rather as a means of monitoring claims. However, the administrative use of radiographs that have been taken in the normal course of patient care is usually appropriate, as long as the patient's right to privacy is respected.

  3. Power system restoration - The second task force report

    SciTech Connect

    Adibi, M.M.; Borkoski, J.N.; Kafka, R.J.

    1987-11-01

    In its second report, the Power System Restoration Task Force (PSR-TF) (1) reviews the 1979-83 North American Electric Reliability Council (NERC) Reports on Major Bulk Power System Disturbances (2), identifying restoration problems which have been encountered during that 5-year period. Generally, these problems fall into three phases of restoration activities: planning for restart, reintegration and restoration of the bulk power supply; control actions during system degradation for saving and retaining critical sources of power; and restoration after a major disturbance when the power system has stabilized. The report also briefly discusses the applicability of several existing programs to the system restoration process. The opinions and conclusions expressed in this paper are those of the authors; they are based on the referenced reports and have not been reviewed with NERC or the reporting utilities.

  4. Power system restoration - The second task force report

    SciTech Connect

    Adibi, M.M.; Borkoski, J.N.; Kafka, R.J.

    1986-01-01

    In its second report, the Power System Restoration Task Force (PSR-TF) (1) reviews the 1979-83 North American Electric Reliability Council (NERC) Reports on Major Bulk Power System Disturbances (2), identifying restoration problems which have been encountered during that 5-year period. Generally, these problems fall into three phases of restoration activities: planning for restart, reintegration and restoration of the bulk power supply; control actions during system degradation for saving and retaining critical sources of power; and restoration after a major disturbance when the power system has stabilized. The report also briefly discusses the applicability of several existing programs to the system restoration process. The opinions and conclusions expressed in this paper are those of the authors; they are bases on the referenced reports and have not been reviewed with NERC or the reporting utilities.

  5. [Judicial and administrative consequences of reporting of adolescents in danger].

    PubMed

    Rey, C; Alvin, P

    1995-05-01

    Adolescent victims of abuse or neglect are regularly reported to social agencies and legal authorities. However, decisions following reports often remain unknown, leaving the question of the reporting's relevance open. POPULATION AND METHODS--Forty-one consecutive written reports sent to child protective services were reviewed, and their content analysed. These services were then contacted by telephone, in order to gather information on outcome. RESULTS--Forty-one reports concerned 40 adolescents (32 girls, 8 boys); 36 of whom had been admitted to our adolescent medicine ward. The most common reason for admission was a suicide attempt (20 cases). Thirty-nine reports were destined to legal authorities, while two to social agencies. The reason for reporting was physical or sexual abuse in more than half of the cases. In twenty-five cases, the main request was a separation from the family. Eighteen adolescents were lost from our medical follow-up after reporting. Thirty-two reports to legal authorities had led to a hearing by a juvenile judge answered favorably in two-thirds of the cases, after a mean period of 26 days. All the subjects for whom a separation from the family was not requested in the report remained at home. CONCLUSION--A simple telephone call is enough to gather information about the following of reports and enables an evaluation of the relevancy of its requests. The interface between the health care and legal systems needs improving through better coordination. Pediatricians should be leaders in this field.

  6. Fringe Benefits for Principals, Assistant Principals & Other Administrators. Administrative Information Report.

    ERIC Educational Resources Information Center

    National Association of Secondary School Principals, Reston, VA.

    The statistical data included in this report was collected from a survey of 1,052 school districts, all of which enroll at least 300 pupils. The data indicate national trends in paid vacation and leave policies, retirement plans, insurance benefits, severance pay, and school district payment of membership dues for principals, assistant principals,…

  7. National Aeronautics and Space Administration: 1998 Accountability Report

    NASA Technical Reports Server (NTRS)

    1999-01-01

    This Accountability Report summarizes NASA's program accomplishments and its stewardship over budget and financial resources. The report is the culmination of NASA's management process, which begins with mission definition and program planning, continues with formulation and justification of NASA's budgets for the President and Congress, and ends with NASA scientific and engineering program accomplishments. This report covers NASA's activities from October 1, 1997, through September 30, 1998, with discussion of some subsequent events.

  8. Energy Information Administration annual report to Congress, 1991

    SciTech Connect

    Not Available

    1992-03-04

    Created by Congress in 1977 as an independent entity within the Department of Energy, the Energy Information Administration (EIA) is the principal and authoritative source of comprehensive energy data for the Congress, the Federal Government, the States, and the public. During 1991, EIA was called upon for information and analysis required by policymakers dealing with many energy-related issues, including the Persian Gulf War, the adequacy of propane supplies during the winter heating season, issues arising from the Clean Air Act, and implementation of the Department`s National Energy Strategy.

  9. Nurses' attitudes and perceived barriers to the reporting of medication administration errors.

    PubMed

    Yung, Hai-Peng; Yu, Shu; Chu, Chi; Hou, I-Ching; Tang, Fu-In

    2016-07-01

    (1) To explore the attitudes and perceived barriers to reporting medication administration errors and (2) to understand the characteristics of - and nurses' feelings - about error reports. Under-reporting of medication administration errors is a global concern related to the safety of patient care. Understanding nurses' attitudes and perceived barriers to error reporting is the initial step to increasing the reporting rate. A cross-sectional, descriptive survey with a self-administered questionnaire was completed by the nurses of a medical centre hospital in Taiwan. A total of 306 nurses participated in the study. Nurses' attitudes towards medication administration error reporting were inclined towards positive. The major perceived barrier was fear of the consequences after reporting. The results demonstrated that 88.9% of medication administration errors were reported orally, whereas 19.0% were reported through the hospital internet system. Self-recrimination was the common feeling of nurses after the commission of an medication administration error. Even if hospital management encourages errors to be reported without recrimination, nurses' attitudes toward medication administration error reporting are not very positive and fear is the most prominent barrier contributing to underreporting. Nursing managers should establish anonymous reporting systems and counselling classes to create a secure atmosphere to reduce nurses' fear and provide incentives to encourage reporting. © 2016 John Wiley & Sons Ltd.

  10. Extension Master Gardener Intranet: Automating Administration, Motivating Volunteers, Increasing Efficiency, and Facilitating Impact Reporting

    ERIC Educational Resources Information Center

    Bradley, Lucy K.; Cook, Jonneen; Cook, Chris

    2011-01-01

    North Carolina State University has incorporated many aspects of volunteer program administration and reporting into an on-line solution that integrates impact reporting into daily program management. The Extension Master Gardener Intranet automates many of the administrative tasks associated with volunteer management, increasing efficiency, and…

  11. 31 CFR 312.3 - Collections, investigations, and reports for the Federal Housing Administration.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... UNITED STATES § 312.3 Collections, investigations, and reports for the Federal Housing Administration... 31 Money and Finance:Treasury 2 2012-07-01 2012-07-01 false Collections, investigations, and reports for the Federal Housing Administration. 312.3 Section 312.3 Money and Finance:...

  12. 31 CFR 312.3 - Collections, investigations, and reports for the Federal Housing Administration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... UNITED STATES § 312.3 Collections, investigations, and reports for the Federal Housing Administration... 31 Money and Finance:Treasury 2 2011-07-01 2011-07-01 false Collections, investigations, and reports for the Federal Housing Administration. 312.3 Section 312.3 Money and Finance:...

  13. 31 CFR 312.3 - Collections, investigations, and reports for the Federal Housing Administration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... UNITED STATES § 312.3 Collections, investigations, and reports for the Federal Housing Administration... 31 Money and Finance: Treasury 2 2014-07-01 2014-07-01 false Collections, investigations, and reports for the Federal Housing Administration. 312.3 Section 312.3 Money and Finance:...

  14. Extension Master Gardener Intranet: Automating Administration, Motivating Volunteers, Increasing Efficiency, and Facilitating Impact Reporting

    ERIC Educational Resources Information Center

    Bradley, Lucy K.; Cook, Jonneen; Cook, Chris

    2011-01-01

    North Carolina State University has incorporated many aspects of volunteer program administration and reporting into an on-line solution that integrates impact reporting into daily program management. The Extension Master Gardener Intranet automates many of the administrative tasks associated with volunteer management, increasing efficiency, and…

  15. TUESDAY: EPA Administrator to Discuss Historic Clean Power Plan to Cut U.S. Carbon Pollution and Protect Public Health

    EPA Pesticide Factsheets

    WASHINGTON - On Tuesday, August 11, EPA Administrator Gina McCarthy will be discussing the Clean Power Plan at the Resources for the Future (RFF) Leadership Forum. The Clean Power Plan will protect public health, spur clean energy investments and st

  16. Laser power beaming system analyses. Final report

    SciTech Connect

    Zeiders, G.W. Jr.

    1993-08-01

    The successful demonstration of the PAMELA adaptive optics hardware and the fabrication of the BTOS truss structure were identified by the program office as the two most critical elements of the NASA power beaming program, so it was these that received attention during this program. Much of the effort was expended in direct program support at MSFC, but detailed technical analyses of the AMP deterministic control scheme and the BTOS truss structure (both the JPL design and a spherical one) were prepared and are attached, and recommendations are given.

  17. Solar powered wastewater treatment plant. Final report

    SciTech Connect

    Venhuizen, D.

    1981-11-06

    Enhancement of the ability of a hyacinth pond to provide secondary effluent was studied. Control of flow geometry was addressed, and the hyacinth pond's role as part of an overall treatment system was emphasized. The use of greenhouses over the ponds to protect the plants during the winter was evaluated. The thermal and structural performances of the greenhouses were analyzed. It was concluded that the plants could be kept alive and green with only a tarpaulin-like cover in the winter climate of Texas, but to keep the plants actively growing would require a tightly built greenhouse with good infiltration control. The third area of investigation was the potential of wind power for providing energy for wastewater aeration. Aeration methods amenable to the use of wind power as the prime mover were investigated and found to compare favorably with standard aeration methods. The wind distribution at the site was monitored to determine whether the wind could be relied upon as a source of aeration energy.

  18. 48 CFR 1852.217-70 - Property administration and reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) shall be reported to the NASA originating office for possible reutilization before disposition. (End of... acquired for, and reimbursed by, NASA or transferred by NASA for use under this NASA-Interagency Purchase...

  19. 48 CFR 1852.217-70 - Property administration and reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) shall be reported to the NASA originating office for possible reutilization before disposition. (End of... acquired for, and reimbursed by, NASA or transferred by NASA for use under this NASA-Interagency Purchase...

  20. 48 CFR 1852.217-70 - Property administration and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) shall be reported to the NASA originating office for possible reutilization before disposition. (End of... acquired for, and reimbursed by, NASA or transferred by NASA for use under this NASA-Interagency Purchase...

  1. 48 CFR 1852.217-70 - Property administration and reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) shall be reported to the NASA originating office for possible reutilization before disposition. (End of... acquired for, and reimbursed by, NASA or transferred by NASA for use under this NASA-Interagency Purchase...

  2. 48 CFR 1852.217-70 - Property administration and reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) shall be reported to the NASA originating office for possible reutilization before disposition. (End of... acquired for, and reimbursed by, NASA or transferred by NASA for use under this NASA-Interagency Purchase...

  3. Case report: Neuromuscular block induced by rocuronium following sugammadex administration.

    PubMed

    Askin, Tugba; Unver, Suheyla; Oguz, Deniz; Kutay, Kubra

    2017-02-01

    We present a case in which rocuronium was applied for muscle relaxation following the administration of sugammadex. An emergency surgery under general anesthesia was planned for a 43-year-old male patient due to an L1 vertebral corpus and right tibia-fibula shaft fracture. Anesthesia was induced with fentanyl, propofol and lidocaine. After applying only 30mg of the total induction dose of rocuronium, it was learned that the neurological examination should be controlled again from the surgeon because of the controversial of the neurological deficit. As a result, patient awakened from anesthesia. We administered 2mg/kg sugammadex and spontaneous breathing of patient returned immediately. The patient became conscious and orientated immediately afterwards. The neurological examination of the lower extremities was performed. The patient was anesthetized once again and 0.6mg/kg rocuronium was given in order to gain neoromuscular block approximately 10min after sugammadex administration. 2min later, the patient was smoothly intubated. Neuromuscular monitorization was not used because of emergency. We administered 2mg/kg sugammadex at the end of the procedure and the patient was extubated. The most suitable time for the re-establishment of rocuronium following sugammadex is currently unclear. This case showed that neuromuscular block can be effectively re-induced by rocuronium following the reversal of rocuronium-induced neuromuscular block with sugammadex. In this case, we consider that the ability to effectively reuse normal induction doses of rocuronium is an important clinical observation. Copyright © 2016 Elsevier Inc. All rights reserved.

  4. Replacement Power Facility site selection report

    SciTech Connect

    Wike, L.D.; Toole, G.L.; Specht, W.L.

    1992-06-01

    The Department of Energy (DOE) has proposed the construction and operation of a Replacement Power Facility (RPF) for supplementing and replacing existing sources of steam and possibly electricity at the Savannah River Site (SRS). DOE is preparing an Environmental Impact Statement (EIS) for this project As part of the impact analysis of the proposed action, the EIS will include a detailed description of the environment where the RPF will be constructed. This description must be specific to the recommended site at SRS, which contains more than 300 square miles of land including streams, lakes, impoundments, wetlands, and upland areas. A formal site-selection process was designed and implemented to identify the preferred RPF site.

  5. Power Systems of the Future: A 21st Century Power Partnership Thought Leadership Report

    SciTech Connect

    Zinaman, Owen; Miller, Mackay; Adil, Ali; Arent, Douglas; Cochran, Jaquelin; Vora, Ravi; Aggarwal, Sonia; Bipath, Minnesh; Linvill, Carl; David, Ari; Kauffman, Richard; Futch, Matt; Villanueva Arcos, Efraín; Valenzuela, José María; Martinot, Eric; Bazilian, Morgan; Pillai, Reji Kumar

    2015-02-01

    This report summarizes key forces driving transformation in the power sector around the world, presents a framework for evaluating decisions regarding extent and pace of change, and defines pathways for transformation. Powerful trends in technology, policy environments, financing, and business models are driving change in power sectors globally. In light of these trends, the question is no longer whether power systems will be transformed, but rather how these transformations will occur. Three approaches to policy and technology decision-making can guide these transformations: adaptive, reconstructive, and evolutionary. Within these approaches, we explore the five pathways that have emerged as viable models for power system transformation.

  6. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA`s Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  7. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA's Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  8. Precise time dissemination and applications development on the Bonneville Power Administration system

    NASA Technical Reports Server (NTRS)

    Martin, Ken E.; Esztergalyos, J.

    1992-01-01

    The Bonneville Power Administration (BPA) uses IRIG-B transmitted over microwave as its primary system time dissemination. Problems with accuracy and reliability have led to ongoing research into better methods. BPA has also developed and deployed a unique fault locator which uses precise clocks synchronized by a pulse over microwaves. It automatically transmits the data to a central computer for analysis. A proposed system could combine fault location timing and time dissemination into a Global Position System (GPS) timing receiver and close the verification loop through a master station at the Dittmer Control Center. Such a system would have many advantages, including lower cost, higher reliability, and wider industry support. Test results indicate the GPS has sufficient accuracy and reliability for this and other current timing requirements including synchronous phase angle measurements. A phasor measurement system which provides phase angle has recently been tested with excellent results. Phase angle is a key parameter in power system control applications including dynamic braking, DC modulation, remedial action schemes, and system state estimation. Further research is required to determine the applications which can most effectively use real-time phase angle measurements and the best method to apply them.

  9. Precise time dissemination and applications development on the Bonneville Power Administration system

    NASA Technical Reports Server (NTRS)

    Martin, Ken E.; Esztergalyos, J.

    1992-01-01

    The Bonneville Power Administration (BPA) uses IRIG-B transmitted over microwave as its primary system time dissemination. Problems with accuracy and reliability have led to ongoing research into better methods. BPA has also developed and deployed a unique fault locator which uses precise clocks synchronized by a pulse over microwaves. It automatically transmits the data to a central computer for analysis. A proposed system could combine fault location timing and time dissemination into a Global Position System (GPS) timing receiver and close the verification loop through a master station at the Dittmer Control Center. Such a system would have many advantages, including lower cost, higher reliability, and wider industry support. Test results indicate the GPS has sufficient accuracy and reliability for this and other current timing requirements including synchronous phase angle measurements. A phasor measurement system which provides phase angle has recently been tested with excellent results. Phase angle is a key parameter in power system control applications including dynamic braking, DC modulation, remedial action schemes, and system state estimation. Further research is required to determine the applications which can most effectively use real-time phase angle measurements and the best method to apply them.

  10. Radioactive Effluents from Nuclear Power Plants Annual Report 2008

    SciTech Connect

    U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation

    2010-12-10

    This report describes radioactive effluents from commercial nuclear power plants (NPPs) in the United States. This information was reported by the licensees for radioactive discharges that occurred in 2008. The report provides information relevant to the potential impact of NPPs on the environment and on public health.

  11. Radioactive Effluents from Nuclear Power Plants Annual Report 2007

    SciTech Connect

    U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation

    2010-12-10

    This report describes radioactive effluents from commercial nuclear power plants (NPPs) in the United States. This information was reported by the licensees for radioactive discharges that occurred in 2007. The report provides information relevant to the potential impact of NPPs on the environment and on public health.

  12. Pulsed Power Science and Technology: A Strategic Outlook for the National Nuclear Security Administration (Summary)

    SciTech Connect

    Sinars, Daniel; Scott, Kimberly Carole; Edwards, M. John; Olson, Russell Teall

    2016-10-17

    Major advances in pulsed power technology and applications over the last twenty years have expanded the mission areas for pulsed power and created compelling new opportunities for the Stockpile Stewardship Program (SSP). This summary document is a forward look at the development of pulsed power science and technology (PPS&T) capabilities in support of the next 20 years of the SSP. This outlook was developed during a three-month-long tri-lab study on the future of PPS&T research and capabilities in support of applications to: (1) Dynamic Materials, (2) Thermonuclear Burn Physics and Inertial Confinement Fusion (ICF), and (3) Radiation Effects and Nuclear Survivability. It also considers necessary associated developments in next-generation codes and pulsed power technology as well as opportunities for academic, industry, and international engagement. The document identifies both imperatives and opportunities to address future SSP mission needs. This study was commissioned by the National Nuclear Security Administration (NNSA). A copy of the memo request is contained in the Appendix. NNSA guidance received during this study explicitly directed that it not be constrained by resource limitations and not attempt to prioritize its findings against plans and priorities in other areas of the national weapons program. That prioritization, including the relative balance amongst the three focus areas themselves, must of course occur before any action is taken on the observations presented herein. This unclassified summary document presents the principal imperatives and opportunities identified in each mission and supporting area during this study. Preceding this area-specific outlook, we discuss a cross-cutting opportunity to increase the shot capacity on the Z pulsed power facility as a near-term, cost-effective way to broadly impact PPS&T for SSP as well as advancing the science and technology to inform future SSMP milestones over the next 5-10 years. The final page of the

  13. Educational Administration and Management. Reports Studies C.95.

    ERIC Educational Resources Information Center

    Turner, Trevor; Persaud, Ganga

    This case study reports results of research on the extent of nonformal education in Guyana; comparison of commitment in private and public enterprises; and financial support, program organization and management, learners' background and objectives, content and methodology, and evaluation strategy. The first two chapters describe the study's…

  14. Final Report to Youth Development and Delinquency Prevention Administration.

    ERIC Educational Resources Information Center

    California State Dept. of the Youth Authority, Sacramento.

    The 1967 President's Crime Commission proposed the development of youth service bureaus, the concept and purpose of which were to provide needed services to youth rather than process them unnecessarily through the courts. As the Crime Commission Report provided no models for these bureaus, many types evolved. This study locates and describes…

  15. Educational Administration and Management. Reports Studies C.95.

    ERIC Educational Resources Information Center

    Turner, Trevor; Persaud, Ganga

    This case study reports results of research on the extent of nonformal education in Guyana; comparison of commitment in private and public enterprises; and financial support, program organization and management, learners' background and objectives, content and methodology, and evaluation strategy. The first two chapters describe the study's…

  16. Solar powered circulation pump development. Final report

    SciTech Connect

    Johnson, A.L.

    1980-09-01

    An iterative design and evaluation process was undertaken to develop a prototype solar powered liquid circulation pump. The first effort was to review the state-of-the-art of liquid piston heat engines. Next a morphological analysis of the original concept was performed. An analysis of the pump performance from a theoretical basis was performed by deriving and solving the equations governing the cycle. The results are documented. An experimental evaluation of the condensing phenomena was performed. The design of the boiler was then undertaken. This effort showed a fundamental physical limitation imposed by the original geometry and the physics of water boiling. In an effort to resolve this problem, a number of alternate configurations were examined, with the result being that the boiler and heat pipe elements of the design were entirely eliminated. In their stead it was assumed that the boiling could be conducted in the solar panel. A number of solar panel designs were examined, and the most appropriate type of solar panel is described in the appendix. A 1/4th scale unit was fabricated and tested. The overall efficiency was approximately 1% at the design point, compared with a theoretical limit of 1.6% for the given operating conditions. The production costs of the full size pump were examined. Finally systems integration aspects were considered and the results presented.

  17. Fringe Benefits for Administrative and Supervisory Personnel in Public Schools, 1973-74. An ERS Report.

    ERIC Educational Resources Information Center

    Stieber, Gertrude N.

    This report, the second of two major studies for 1973-74 on salary schedules and fringe benefits for administrative and supervisory personnel in public schools, presents the results of a broad national study of fringe benefits for school administrators. It provides information on the extent and nature of leave provisions (sickness, vacation,…

  18. Fringe Benefits for Administrative and Supervisory Personnel in Public Schools, 1973-74. An ERS Report.

    ERIC Educational Resources Information Center

    Stieber, Gertrude N.

    This report, the second of two major studies for 1973-74 on salary schedules and fringe benefits for administrative and supervisory personnel in public schools, presents the results of a broad national study of fringe benefits for school administrators. It provides information on the extent and nature of leave provisions (sickness, vacation,…

  19. Annual report to Congress 1994, Energy Information Administration

    SciTech Connect

    1995-04-05

    During 1994, EIA`s main goal was to assure its data and analyses were of the highest quality, relevant to its customers` needs, and easily accessible. Efforts to ensure product relevance and quality consisted of conducting new or modified surveys, issuing new information products, revising existing products to include data and analyses desired by EIA`s customers, and eliminating products that no longer meet customer needs. Efforts to improve access to energy information consisted of several electronic dissemination initiatives, including Internet services, the Energy Information Highway, and the Energy Emergency Notebook. These activities are discussed in detail in the first two sections of this report. In addition to maintaining its traditional energy information base, EIA plays an important role in developing new information resources required by policymakers and legislators around the world. Examples include data on alternative fuels and greenhouse gas emissions.

  20. Performance assessment of OTEC power systems and thermal power plants. Final report. Volume I

    SciTech Connect

    Leidenfrost, W.; Liley, P.E.; McDonald, A.T.; Mudawwar, I.; Pearson, J.T.

    1985-05-01

    The focus of this report is on closed-cycle ocean thermal energy conversion (OTEC) power systems under research at Purdue University. The working operations of an OTEC power plant are briefly discussed. Methods of improving the performance of OTEC power systems are presented. Brief discussions on the methods of heat exchanger analysis and design are provided, as are the thermophysical properties of the working fluids and seawater. An interactive code capable of analyzing OTEC power system performance is included for use with an IBM personal computer.

  1. Report: Improved Contract Administration Needed for the Customer Technology Solutions Contract

    EPA Pesticide Factsheets

    Report #13-P-0398, September 16, 2013. Based on our review of the WCF contract EPW08034, which ended September 2012, the EPA needs to improve its contract administration to assist in managing other similar type contracts.

  2. Ohio osteopathic residency directors' self-reported administrative knowledge and skills before and after participation in an administrative training program.

    PubMed

    Sheehan, Olivia Ojano; Brannan, Grace

    2013-04-01

    Residency directors require myriad skills to perform their jobs efficiently. However, many residency directors receive no training prior to obtaining their positions. To determine the effectiveness of the Residency Directors Residency Administration Program (RD RAP)--a 1-year fellowship training program for Ohio osteopathic residency directors sponsored by the Ohio University Heritage College of Osteopathic Medicine/Centers for Osteopathic Research and Education--by measuring the administrative knowledge and skills of Ohio osteopathic residency directors before and after completion of the program. The authors administered a 54-item self-assessment instrument to RD RAP participants before and after the 2009-2010 and 2010-2011 programs. The assessment asked participants to rank their knowledge and skills in administration on a 5-point Likert scale, with lower values indicating higher knowledge and skills. We analyzed data from the pre- and postprogram assessments by using the Wilcoxon signed rank nonparametric test. The 54 assessment items were categorized into 10 content domains. Ten RD RAP participants completed the assessments. Median scores were statistically significantly lower for each of the 10 content domains after the RD RAP program. The content domain with the greatest change between pre- and postprogram assessment Likert scale scores was Legal Issues in Residency Training, with a median change of 1.7 (P=.007). Role of Program Directors, Personality, and Professional Development had the smallest change in pre- and postprogram assessment Likert scores, with a median change of 0.8 (P=.011). Statistically significant improvements were found in the osteopathic residency directors' self-reported administrative knowledge and skills after participation in the RD RAP.

  3. Marketing solenoid power saving device. Third quarterly report

    SciTech Connect

    1998-06-06

    I am continuing to explore three methods of marketing the solenoid power saving device. Since the redesign reported in the last report, we are pursuing both the OEM market, the distributor market in both turf and agricultural areas, and the export market. Progress in these areas is discussed: OEM, distribution; and export.

  4. IEA Small Solar Power Systems Project: operation status report

    SciTech Connect

    Not Available

    1983-09-01

    The status of the operation of the IEA Small Solar Power Systems Project is reported for the period from January 1, 1983 to August 31, 1983. Included are reports of new hardware activities as given by the installation of both the advanced sodium receiver in the central receiver system and a 3rd collector field in the distributed collector system. (LEW)

  5. The Veterans Administration Experiments in Health Communications on the Applications Technology Satellite (ATS-6). Final Report.

    ERIC Educational Resources Information Center

    Caldwell, Kathryn S.

    Because many of the Veterans Administration hospitals in Appalachia are located great distances from medical teaching facilities, high powered communication satellites have been employed to facilitate quality two-way communication between medical personnel scattered throughout the region. To achieve diagnostic, therapeutic, and educational…

  6. Year 1 Progress Report Computational Materials and Chemical Sciences Network Administration

    SciTech Connect

    Rehr, John J.

    2012-08-02

    This document reports progress on the project “Computational Materials and Chemical Sciences Network Administration,” which is supported by DOE BES Grant DE-FG02-02ER45990 MOD 08. As stated in the original proposal, the primary goal of this project is to carry out the scientific administrative responsibilities for the Computational Materials and Chemical Sciences Network (CMCSN) of the U.S. Department of Energy, Office of Basic Energy Sciences. These responsibilities include organizing meetings, publishing and maintaining CMCSN’s website, publishing a periodic newsletter, writing original material for both the website and the newsletter, maintaining CMCSN documentation, editing scientific documents, as needed, serving as liaison for the entire Network, facilitating information exchange across the network, communicating CMCSN’s success stories to the larger community and numerous other tasks outside the purview of the scientists in the CMCSN. Given the dramatic increase in computational power, advances in computational materials science can have an enormous impact in science and technology. For many of the questions that can be addressed by computation there is a choice of theoretical techniques available, yet often there is no accepted understanding of the relative strengths and effectiveness of the competing approaches. The CMCSN fosters progress in this understanding by providing modest additional funding to research groups which engage in collaborative activities to develop, compare, and test novel computational techniques. Thus, the CMCSN provides the “glue” money which enables different groups to work together, building on their existing programs and expertise while avoiding unnecessary duplication of effort. This includes travel funding, partial postdoc salaries, and funding for periodic scientific meetings. The activities supported by this grant are briefly summarized below.

  7. Nuclear power generation and fuel cycle report 1996

    SciTech Connect

    1996-10-01

    This report presents the current status and projections through 2015 of nuclear capacity, generation, and fuel cycle requirements for all countries using nuclear power to generate electricity for commercial use. It also contains information and forecasts of developments in the worldwide nuclear fuel market. Long term projections of U.S. nuclear capacity, generation, and spent fuel discharges for two different scenarios through 2040 are developed. A discussion on decommissioning of nuclear power plants is included.

  8. Administrators' Power Usage Styles and Their Impact on the Organizational Culture in Colleges of Education: A Case Study

    ERIC Educational Resources Information Center

    Ozcan, Kenan; Karatas, Ibrahim Hakan; Caglar, Çaglar; Polat, Murat

    2014-01-01

    The main purpose of this study is to determine how power usage styles of administrators of faculties of education influence the organizational culture in their respective faculties in Turkey. Using the phenomenological method, a qualitative research method, researchers studied a group comprised of 20 academics from 7 different colleges of…

  9. 75 FR 69112 - Federal Housing Administration (FHA): Notice of FHA PowerSaver Home Energy Retrofit Loan Pilot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-10

    ... rebound effect will depend on the income of the household and the path of energy prices. Costs. The cost... URBAN DEVELOPMENT Federal Housing Administration (FHA): Notice of FHA PowerSaver Home Energy Retrofit...'s proposal to conduct an FHA Home Energy Retrofit Loan Pilot Program (Retrofit Pilot Program or...

  10. Conceptions of Power among Senior Women Administrators at Liberal Arts Colleges in the Upper Midwestern United States

    ERIC Educational Resources Information Center

    Enke, Kathryn

    2014-01-01

    Women are underrepresented in senior-level leadership positions in higher education institutions, and their experiences are underrepresented in research about leadership and power in higher education. This qualitative study engaged women senior administrators at liberal arts colleges in the Upper Midwestern United States to better understand how…

  11. Conceptions of Power among Senior Women Administrators at Liberal Arts Colleges in the Upper Midwestern United States

    ERIC Educational Resources Information Center

    Enke, Kathryn

    2014-01-01

    Women are underrepresented in senior-level leadership positions in higher education institutions, and their experiences are underrepresented in research about leadership and power in higher education. This qualitative study engaged women senior administrators at liberal arts colleges in the Upper Midwestern United States to better understand how…

  12. Communications and control for electric power systems: Final report

    SciTech Connect

    Kirkham, H.

    1998-04-01

    This report is a summary of some of the work done on the Communications and Control project, with particular emphasis on the achievements during the years 1986--1996. During those years, the project moved away from concern with dispersed storage and generation and its impact on power system operation (the team was responsible for studies in this area, and for making a power system simulator that included DSG), and became involved in more concrete work aimed at applying high-tech solutions to problems of power system communications and control. This report covers work done at JPL on the following topics: (1) the measurement of electric and magnetic fields, both ac and dc; (2) the use of optical power to supply low-power electronics; (3) the design of a fault-tolerant communication system designed for distribution automation; and (4) a digital phase locked loop that allows the use of low-power transmitting electronics to recreate a good-quality signal at the receiver. In a report of this kind, only the results and highlights of the work are described.

  13. Mandate for leadership: policy management in a conservative administration. [report by Heritage Foundation

    SciTech Connect

    Heatherly, C.L.

    1981-01-01

    Mandate for leadership was conceived in the fall of 1979 as a means of assisting the transition to a new administration in the event that a conservative President were elected in 1980. The premise was that conservatives must be prepared to answer the question, What is the conservative agenda, particularly for the first 100 days. The production of this volume has been an enterprise involving twenty project teams and over three hundred contributors. Three parts are devoted, respectively, to: (I) The Cabinet Departments (13 chapters); (II) Independent Regulatory Agencies (13 chapters); and (III) Other Agencies (6 chapters). Also, there is an epilogue, What the President Can Do by Executive Order. The authors of the chapters in this report were recruited as team chairmen for their respective agencies or groups of agencies; each then recruited a team for the production of the report according to certain guidelines. The principal credit for the success of the project belongs to these authors, who translated the concept of a transition report into a detailed and illuminating study of the executive branch of the federal government. The Environmental Protection Agency was pulled out of the regulatory reform group in mid-stream and established as an independent team with over fifty participants due to the mammoth size and unique character of the agency. Recommendations of this volume are not presented as cure-alls, but the editors feel that what is offered by the authors is a series of proposals which, if implemented, will help revitalize our economy, strengthen our national security, and halt the centralization of power in The Federal government. A separate abstract was prepared for each of three chapters, namely: (1) The Department of Energy; (2) The Department of Transportation; and (3) The Environmental Protection Agency.

  14. Electric Power Delivery Testing Feasibility Study Task 6 Final Report

    SciTech Connect

    Thomas Tobin

    2009-07-01

    This Final Report is covers the completion of the Electric Power Delivery Testing Feasibility Study. The objective of this project was to research, engineer, and demonstrate high-power laboratory testing protocols to accurately reproduce the conditions on the electric power grid representing both normal load switching and abnormalities such as short-circuit fault protection. Test circuits, equipment, and techniques were developed and proven at reduced power levels to determine the feasibility of building a large-scale high-power testing laboratory capable of testing equipment and systems at simulated high-power conditions of the U.S. power grid at distribution levels up through 38 kiloVolts (kV) and transmission levels up through 230 kV. The project delivered demonstrated testing techniques, high-voltage test equipment for load testing and synthetic short-circuit testing, and recommended designs for future implementation of a high-power testing laboratory to test equipment and systems, enabling increased reliability of the electric transmission and distribution grid.

  15. Mode Effects between Computer Self-Administration and Telephone Interviewer-Administration of the PROMIS® Pediatric Measures, Self and Proxy Report

    PubMed Central

    Magnus, Brooke E.; Liu, Yang; He, Jason; Quinn, Hally; Thissen, David; Gross, Heather E.; DeWalt, Darren A.; Reeve, Bryce B.

    2016-01-01

    Objective To test equivalence of scores obtained with the PROMIS® pediatric Depressive Symptoms, Fatigue, and Mobility measures across two modes of administration: computer self-administration and telephone interviewer-administration. If mode effects are found, to estimate the magnitude and direction of the mode effects. Methods Respondents from an internet survey panel completed the child self-report and parent proxy-report versions of the PROMIS® pediatric Depressive Symptoms, Fatigue, and Mobility measures using both computer self-administration and telephone interviewer-administration in a crossed counterbalanced design. Pearson correlations and multivariate analysis of variance (MANOVA) were used to examine the effects of mode of administration as well as order and form effects. Results Correlations between scores obtained with the two modes of administration were high. Scores were generally comparable across modes of administration, but there were some small significant effects involving mode of administration; significant differences in scores between the two modes ranged from 1.24 to 4.36 points. Conclusions Scores for these pediatric PROMIS measures are generally comparable across modes of administration. Studies planning to use multiple modes (e.g., self-administration and interviewer-administration) should exercise good study design principles to minimize possible confounding effects from mixed modes. PMID:26724944

  16. Mode effects between computer self-administration and telephone interviewer-administration of the PROMIS(®) pediatric measures, self- and proxy report.

    PubMed

    Magnus, Brooke E; Liu, Yang; He, Jason; Quinn, Hally; Thissen, David; Gross, Heather E; DeWalt, Darren A; Reeve, Bryce B

    2016-07-01

    To test equivalence of scores obtained with the PROMIS(®) pediatric Depressive Symptoms, Fatigue, and Mobility measures across two modes of administration: computer self-administration and telephone interviewer-administration. If mode effects are found, to estimate the magnitude and direction of the mode effects. Respondents from an internet survey panel completed the child self-report and parent proxy-report versions of the PROMIS(®) pediatric Depressive Symptoms, Fatigue, and Mobility measures using both computer self-administration and telephone interviewer-administration in a crossed counterbalanced design. Pearson correlations and multivariate analysis of variance were used to examine the effects of mode of administration as well as order and form effects. Correlations between scores obtained with the two modes of administration were high. Scores were generally comparable across modes of administration, but there were some small significant effects involving mode of administration; significant differences in scores between the two modes ranged from 1.24 to 4.36 points. Scores for these pediatric PROMIS measures are generally comparable across modes of administration. Studies planning to use multiple modes (e.g., self-administration and interviewer-administration) should exercise good study design principles to minimize possible confounding effects from mixed modes.

  17. Virginia "Standards of Learning" Assessments. Technical Report: 2003-2004 Administration

    ERIC Educational Resources Information Center

    Virginia Department of Education, 2005

    2005-01-01

    The purpose of this report is to inform users and other interested parties about the development, content and technical characteristics of the Virginia Standards of Learning (SOL) assessments. It provides information for the 2003 "SOL" cycle that comprises the fall 2003 and spring 2004 administrations. The report is divided into three…

  18. 30 CFR 203.83 - What is in an administrative information report?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (not required for non-oil and gas leases); (e) A description of field or lease history; (f) Full... THE INTERIOR MINERALS REVENUE MANAGEMENT RELIEF OR REDUCTION IN ROYALTY RATES OCS Oil, Gas, and Sulfur General § 203.83 What is in an administrative information report? This report identifies the field or...

  19. 30 CFR 203.83 - What is in an administrative information report?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (not required for non-oil and gas leases); (e) A description of field or lease history; (f) Full... THE INTERIOR MINERALS REVENUE MANAGEMENT RELIEF OR REDUCTION IN ROYALTY RATES OCS Oil, Gas, and Sulfur General § 203.83 What is in an administrative information report? This report identifies the field or...

  20. 49 CFR 659.39 - Oversight agency reporting to the Federal Transit Administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Oversight agency reporting to the Federal Transit...) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.39 Oversight agency reporting to the Federal...

  1. 49 CFR 659.39 - Oversight agency reporting to the Federal Transit Administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Oversight agency reporting to the Federal Transit...) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.39 Oversight agency reporting to the Federal...

  2. 49 CFR 659.39 - Oversight agency reporting to the Federal Transit Administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Oversight agency reporting to the Federal Transit...) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.39 Oversight agency reporting to the Federal...

  3. 49 CFR 659.39 - Oversight agency reporting to the Federal Transit Administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Oversight agency reporting to the Federal Transit...) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.39 Oversight agency reporting to the Federal...

  4. 49 CFR 659.39 - Oversight agency reporting to the Federal Transit Administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Oversight agency reporting to the Federal Transit...) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.39 Oversight agency reporting to the Federal...

  5. Dynamic interaction between an OTEC power plant and a power grid. Final report

    SciTech Connect

    Not Available

    1982-08-31

    The objectives of the research reported are: to identify and resolve potential technical problems that may arise from the incorporation of an OTEC power plant in the existing generation mix of Puerto Rico and to develop the tools and to identify the technical resources needed for dynamic analysis of island power systems to which OTEC power plants provide a substantial portion of the load demand. The issues addressed are system modelling and data gathering, network simplification, selection of OTEC plant site and power system, stability analysis, and economic dispatch when OTEC power plants contribute substantially to the island's load. The slow dynamics of the OTEC plant make it a reference for the rest of the power system during a transient, but this slowness is a drawback in terms of system recovery from fault-induced transients. It is found that simple dynamic models can, in most instances, describe the transient behavior of both the OTEC plant and the island's power system, but it was not possible to reduce the non-OTEC portion of the power system to a single generation point and a single load. (LEW)

  6. Acute immune-mediated thrombocytopenia due to oxaliplatin administration: a case report.

    PubMed

    Pietrantonio, Filippo; Di Bartolomeo, Maria; Buzzoni, Roberto; Bajetta, Emilio

    2010-01-01

    Drug-induced acute thrombocytopenia is an extremely rare side effect that may occur immediately after oxaliplatin infusion. This potentially fatal reaction is immune mediated and can be anticipated by mild hemorrhagic signs during previous administrations. This is the first report of acute thrombocytopenia occurring during adjuvant treatment of colorectal cancer with oxaliplatin. Clinicians should be aware of this adverse event in order to prevent possible serious consequences and stop further oxaliplatin administration.

  7. THORs Power Method for Hydrokinetic Devices - Final Report

    SciTech Connect

    J. Turner Hunt; Joel Rumker

    2012-08-08

    Ocean current energy represents a vast untapped source of renewable energy that exists on the outer continental shelf areas of the 5 major continents. Ocean currents are unidirectional in nature and are perpetuated by thermal and salinity sea gradients, as well as coriolis forces imparted from the earth's rotation. This report details THORs Power Method, a breakthrough power control method that can provide dramatic increases to the capacity factor over and above existing marine hydrokinetic (MHK) devices employed in the extraction of energy from ocean currents. THORs Power Method represents a constant speed, variable depth operational method that continually locates the ocean current turbine at a depth at which the rated power of the generator is routinely achieved. Variable depth operation is achieved by using various vertical force effectors, including ballast tanks for variable weight, a hydrodynamic wing for variable lift or down force and drag flaps for variable vehicle drag forces.

  8. Pinon Pine Power Project. Annual report, August 1992--December 1993

    SciTech Connect

    1994-11-01

    This annual report has been prepared to present the status of the Pinon Pine Power Project, a nominal 104 MWe (gross) integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient and reliable and that are able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Power Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal. The Pinon Pine Power Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV.

  9. Wind Powering America's Wind for Schools Project: Summary Report

    SciTech Connect

    Baring-Gould, I.; Newcomb, C.

    2012-06-01

    This report provides an overview of the U.S. Department of Energy, Wind Powering America, Wind for Schools project. It outlines teacher-training activities and curriculum development; discusses the affiliate program that allows school districts and states to replicate the program; and contains reports that provide an update on activities and progress in the 11 states in which the Wind for Schools project operates.

  10. MHD Advanced Power Train Phase I, Final Report, Volume 7

    SciTech Connect

    A. R. Jones

    1985-08-01

    This appendix provides additional data in support of the MHD/Steam Power Plant Analyses reported in report Volume 5. The data is in the form of 3PA/SUMARY computer code printouts. The order of presentation in all four cases is as follows: (1) Overall Performance; (2) Component/Subsystem Information; (3) Plant Cost Accounts Summary; and (4) Plant Costing Details and Cost of Electricity.

  11. Nursing home administrators' perspectives on a study feedback report: a cross sectional survey.

    PubMed

    Boström, Anne-Marie; Cranley, Lisa A; Hutchinson, Alison M; Cummings, Greta G; Norton, Peter G; Estabrooks, Carole A

    2012-09-13

    This project is part of the Translating Research in Elder Care (TREC) program of research, a multi-level and longitudinal research program being conducted in 36 nursing homes in three Canadian Prairie Provinces. The overall goal of TREC is to improve the quality of care for older persons living in nursing homes and the quality of work life for care providers. The purpose of this paper is to report on development and evaluation of facility annual reports (FARs) from facility administrators' perspectives on the usefulness, meaningfulness, and understandability of selected data from the TREC survey. A cross sectional survey design was used in this study. The feedback reports were developed in collaboration with participating facility administrators. FARs presented results in four contextual areas: workplace culture, feedback processes, job satisfaction, and staff burnout. Six weeks after FARs were mailed to each administrator, we conducted structured telephone interviews with administrators to elicit their evaluation of the FARs. Administrators were also asked if they had taken any actions as a result of the FAR. Descriptive and inferential statistics, as well as content analysis for open-ended questions, were used to summarize findings. Thirty-one facility administrators (representing thirty-two facilities) participated in the interviews. Six administrators had taken action and 18 were planning on taking action as a result of FARs. The majority found the four contextual areas addressed in FAR to be useful, meaningful, and understandable. They liked the comparisons made between data from years one and two and between their facility and other TREC study sites in their province. Twenty-two indicated that they would like to receive information on additional areas such as aggressive behaviours of residents and information sharing. Twenty-four administrators indicated that FARs contained enough information, while eight found FARs 'too short'. Administrators who reported

  12. A Comparison of Measures of Administrator Reliance on Power Bases for Influence.

    ERIC Educational Resources Information Center

    Richardson, Rita C.

    This paper compares the Hersey-Natemeyer "Power Perception Profile" with the "Richardson Power Profile (RPP)," both of which are measures of a leader's reliance on power bases to affect followers within organizations. Two previously conducted factor analyses of the normative measure--the RPP--indicate that there are fewer than…

  13. Institute of Nuclear Power Operations annual report, 1993

    SciTech Connect

    1993-12-31

    This annual report highlights the activities of the Institute of Nuclear Power Operations. The topics of the report include the president and chairmen`s joint message, overview of programs serving as the foundation for most of its activities, performance indicators for the US nuclear utility industry, and INPO`s 1993 financial reports and rosters. INPO has four technical cornerstone programs that serve as the foundation for most of its activities. (1) Evaluations of nuclear power plants operated by member utilities are conducted on a regularly scheduled basis. (2) INPO supports its member utilities in their work to achieve and maintain accreditation of training programs. (3) Events analysis programs identify and communicate lessons learned from plant events so utilities can take action to prevent similar events at their plants. (4) INPO helps members improve in nuclear operations areas through assistance programs and other activities that continually evolve to meet the changing needs of the nuclear industry.

  14. Institute of Nuclear Power Operations 1994 annual report

    SciTech Connect

    1994-12-31

    This annual report highlights the activities of the Institute of Nuclear Power Operations. The topics of the report include the president and chairmen`s joint message, overview of programs serving as the foundation for most of its activities, performance indicators for the US nuclear utility industry, and INPO`s 1994 financial reports and rosters. INPO has four technical cornerstone programs that serve as the foundation for most of its activities. (1) Evaluations of nuclear power plants operated by member utilities are conducted on a regularly scheduled basis. (2) INPO supports its member utilities in their work to achieve and maintain accreditation of training programs. (3) Events analysis programs identify and communicate lessons learned from plant events so utilities can take action to prevent similar events at their plants. (4) INPO helps members improve in nuclear operations areas through assistance programs and other activities that continually evolve to meet the changing needs of the nuclear industry

  15. Simulated coal gas MCFC power plant system verification. Final report

    SciTech Connect

    1998-07-30

    The objective of the main project is to identify the current developmental status of MCFC systems and address those technical issues that need to be resolved to move the technology from its current status to the demonstration stage in the shortest possible time. The specific objectives are separated into five major tasks as follows: Stack research; Power plant development; Test facilities development; Manufacturing facilities development; and Commercialization. This Final Report discusses the M-C power Corporation effort which is part of a general program for the development of commercial MCFC systems. This final report covers the entire subject of the Unocal 250-cell stack. Certain project activities have been funded by organizations other than DOE and are included in this report to provide a comprehensive overview of the work accomplished.

  16. Improving the safety of LWR power plants. Final report

    SciTech Connect

    Not Available

    1980-04-01

    This report documents the results of the Study to identify current, potential research issues and efforts for improving the safety of Light Water Reactor (LWR) power plants. This final report describes the work accomplished, the results obtained, the problem areas, and the recommended solutions. Specifically, for each of the issues identified in this report for improving the safety of LWR power plants, a description is provided in detail of the safety significance, the current status (including information sources, status of technical knowledge, problem solution and current activities), and the suggestions for further research and development. Further, the issues are ranked for action into high, medium, and low priority with respect to primarily (a) improved safety (e.g. potential reduction in public risk and occupational exposure), and secondly (b) reduction in safety-related costs (improving or maintaining level of safety with simpler systems or in a more cost-effective manner).

  17. Practice patterns and postoperative complications before and after US Food and Drug Administration safety communication on power morcellation.

    PubMed

    Harris, John A; Swenson, Carolyn W; Uppal, Shitanshu; Kamdar, Neil; Mahnert, Nichole; As-Sanie, Sawsan; Morgan, Daniel M

    2016-01-01

    In April 2014, the US Food and Drug Administration (FDA) published its first safety communication discouraging "the use of laparoscopic power morcellation during hysterectomy or myomectomy for the treatment of women with uterine fibroids." Due to the concern of worsening outcomes for patients with occult uterine malignancy, specifically uterine leiomyosarcoma, the FDA recommended a significant change to existing surgical planning, patient consent, and surgical technique in the United States. We sought to report temporal trends in surgical approach to hysterectomy and postoperative complications before and after the April 17, 2014, FDA safety communication concerning the use of power morcellation during myomectomy or hysterectomy. A retrospective cohort study was performed with patients undergoing hysterectomy for benign indications in the Michigan Surgical Quality Collaborative from Jan. 1, 2013, through Dec. 31, 2014. The rates of abdominal, laparoscopic, and vaginal hysterectomy, as well as the rates of major postoperative complications and 30-day hospital readmissions and reoperations, were compared before and after April 17, 2014, the date of the original FDA safety communication. Major postoperative complications included blood transfusions, vaginal cuff infection, vaginal cuff dehiscence, ureteral obstruction, vesicovaginal fistula, deep and organ space surgical site infection, acute renal failure, respiratory failure, sepsis, pulmonary embolism, deep vein thrombosis requiring therapy, cerebral vascular accident, cardiac arrest, and death. We calculated the median episode cost related to hysterectomy readmissions using Michigan Value Collaborative data. Analyses were performed using robust multivariable multinomial and logistic regression models. There were 18,299 hysterectomies available for analysis during the study period. In all, 2753 cases were excluded due to an indication for cancer, cervical dysplasia, or endometrial hyperplasia, and 174 cases were

  18. Radiant Energy Power Source for Jet Aircraft. Final performance report

    SciTech Connect

    Doellner, O.L.

    1992-02-01

    This report beings with a historical overview on the origin and early beginnings of Radiant Energy Power Source for Jet Aircraft. The report reviews the work done in Phase I (Grant DE-FG01-82CE-15144) and then gives a discussion of Phase II (Grant DE-FG01-86CE-15301). Included is a reasonably detailed discussion of photovoltaic cells and the research and development needed in this area. The report closes with a historical perspective and summary related to situations historically encountered on projects of this nature. 15 refs.

  19. Assessment of administrative claims data for public health reporting of Salmonella in Tennessee.

    PubMed

    Marder, Ellyn; Garman, Katie; Jones, Timothy F; Dunn, John; Jones, Stephen

    2015-04-01

    In the USA, approximately 4% of the estimated 1 million Salmonella infections occurring annually are reported to public health. Administrative claims data from large health insurance companies capture disease-specific data which could potentially enhance public health surveillance. To determine the utility of medical claims data for public health reporting of Salmonella, we assessed medical claims data from BlueCross BlueShield of Tennessee (BCBST) members compared to Tennessee Department of Health (TDH) surveillance data. BCBST Salmonella cases diagnosed during 2007-2011 were matched to TDH Salmonella cases reported during the same time period. Matches and non-matches were validated using medical records. Of the 450 BCBST cases identified, 72% matched TDH cases. All culture-confirmed BCBST cases were reported to TDH. Non-matched BCBST cases included clinical diagnoses which were culture negative or not tested. Our findings indicate administrative claims data are not currently a viable mechanism for enhancing routine reporting of Salmonella infections.

  20. Power Performance Test Report for the SWIFT Wind Turbine

    SciTech Connect

    Mendoza, I.; Hur, J.

    2012-12-01

    This report summarizes the results of a power performance test that NREL conducted on the SWIFT wind turbine. This test was conducted in accordance with the International Electrotechnical Commission's (IEC) standard, Wind Turbine Generator Systems Part 12: Power Performance Measurements of Electricity Producing Wind Turbines, IEC 61400-12-1 Ed.1.0, 2005-12. However, because the SWIFT is a small turbine as defined by IEC, NREL also followed Annex H that applies to small wind turbines. In these summary results, wind speed is normalized to sea-level air density.

  1. JTEC panel on nuclear power in Japan. Final report

    SciTech Connect

    Hansen, K.F.; Behnke, W.B.; Cousin, S.B.; Evans, E.A.; Olander, D.R.

    1990-10-01

    The report examines the status and direction of nuclear power-related research and development in Japan in six areas: the nuclear fuel cycle, nuclear materials, instrumentation and control technology, CAD/CAM, nuclear safety research, and nuclear plant construction. Overall findings suggest that the nuclear power industry in Japan is at an advanced state of development; in particular, Japan is now technologically self-sufficient. Long-term goals of the Japanese program include closure of the complete fuel cycle and pursuit of the liquid metal fast breeder reactor as the future base system.

  2. Pinon Pine Power Project. Annual report, January--December 1994

    SciTech Connect

    1995-01-01

    This annual report has been prepared to present the status of the Pinon Pine Project, a nominal 107 MWe (gross) integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project is a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient and reliable and that are able to achieve substantial reductions in emissions as compared with existing coal technologies.

  3. Impaired Physical Performance and Clinical Responses after a Recreational Bodybuilder's Self-Administration of Steroids: A Case Report

    PubMed Central

    Veras, Katherine; Silva-Junior, Fernando Lopes; Lima-Silva, Adriano Eduardo; De-Oliveira, Fernando Roberto

    2015-01-01

    We reported clinical and physical responses to 7 weeks of anabolic-androgenic steroid (AAS) self-administration in a male recreational bodybuilder. He was self-administrating a total of 3,250 mg of testosterone when his previous and current clinical and physical trials records were revisited. Body shape, performance, and biochemistry results were clustered into three phases labeled PRE (before the self-use), POST I (immediately at the cessation of the 7-week administration), and POST II (12 weeks after the cessation). Elevated testosterone and estradiol levels were observed in the POST I phase, while hepatic and renal functions remained altered in the POST II phase. Body mass and body fat percentages increased throughout the three phases. When adjusted according to body mass, drops in aerobic and anaerobic power and capacity (2.1% to 12.9%) were observed across the phases. This case report shows that overall performance decreased when a bodybuilding practitioner self-administered AAS. PMID:26770942

  4. 29 CFR 1955.12 - Administrative law judge; powers and duties.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) PROCEDURES FOR WITHDRAWAL OF APPROVAL OF STATE PLANS Notice of... the discovery; (4) To regulate the course of the proceeding and the conduct of the parties and...

  5. Agreement between Self-Reported and Administrative Race and Ethnicity Data among Medicaid Enrollees in Minnesota

    PubMed Central

    McAlpine, Donna D; Beebe, Timothy J; Davern, Michael; Call, Kathleen T

    2007-01-01

    Objective This paper measures agreement between survey and administrative measures of race/ethnicity for Medicaid enrollees. Level of agreement and the demographic and health-related characteristics associated with misclassification on the administrative measure are examined. Data Sources Minnesota Medicaid enrollee files matched to self-report information from a telephone/mail survey of 4,902 enrollees conducted in 2003. Study Design Measures of agreement between the two measures of race/ethnicity are computed. Using logistic regression, we also assess whether misclassification of race/ethnicity on administrative files is associated with demographic factors, health status, health care utilization, or ratings of quality of health care. Data Extraction Race/ethnicity fields from administrative Medicaid files were extracted and merged with self-report data. Principal Findings The administrative data correctly classified 94 percent of cases on race/ethnicity. Persons who self-identified as Hispanic and those whose home language was English had the greater odds (compared with persons who self-identified as white and those whose home language was not English) of being misclassified in administrative data. Persons classified as unknown/other on administrative data were more likely to self-identify as white. Conclusions In this case study in Minnesota, researchers can be reasonably confident that the racial designations on Medicaid administrative data comport with how enrollees self-identify. Moreover, misclassification is not associated with common measures of health status, utilization, and ratings of quality of care. Further replication is recommended given variation in how race information is collected and coded by Medicaid agencies in different states. PMID:17995548

  6. Global radioxenon emission inventory based on nuclear power reactor reports.

    PubMed

    Kalinowski, Martin B; Tuma, Matthias P

    2009-01-01

    Atmospheric radioactivity is monitored for the verification of the Comprehensive Nuclear-Test-Ban Treaty, with xenon isotopes 131mXe, 133Xe, 133mXe and 135Xe serving as important indicators of nuclear explosions. The treaty-relevant interpretation of atmospheric concentrations of radioxenon is enhanced by quantifying radioxenon emissions released from civilian facilities. This paper presents the first global radioxenon emission inventory for nuclear power plants, based on North American and European emission reports for the years 1995-2005. Estimations were made for all power plant sites for which emission data were unavailable. According to this inventory, a total of 1.3PBq of radioxenon isotopes are released by nuclear power plants as continuous or pulsed emissions in a generic year.

  7. Flywheel-powered shuttle car. Report of Investigations/1991

    SciTech Connect

    Bartels, J.R.; Mayercheck, W.D.; Hummer, J.A.

    1991-01-01

    The report describes the development, system-by-system evaluation, and preliminary surface testing of a flywheel-powered shuttle car. The use of a self-contained flywheel power source has the potential to eliminate the numerous safety and routing problems associated with tethered mobile equipment. An alternative to conventional power cable systems was developed consisting of the world's first seven-rotor stacked-flywheel system capable of storing 6 kW h of energy at 16,700 rpm. Numerous interdependent systems were necessary for successful interfacing with a conventional shuttle car. Each system was evaluated and tested individually. Finally, the entire shuttle car was surface-tested. The tests indicated that the flywheel energy system can function and operate a shuttle car. The economics of the system and the design of required support systems were not addressed in the project.

  8. Academic Freedom and Tenure: Savannah College of Art and Design. A Supplementary Report on a Censured Administration. Report

    ERIC Educational Resources Information Center

    American Association of University Professors, 2011

    2011-01-01

    This paper presents a supplementary report on the Savannah College of Art and Design (SCAD) censure. Placement of the Savannah College of Art and Design on the Association's censure list, by the 1993 annual meeting, followed from the SCAD administration's dismissal of two faculty members without having demonstrated cause, thereby denying them…

  9. Academic Freedom and Tenure: Savannah College of Art and Design. A Supplementary Report on a Censured Administration. Report

    ERIC Educational Resources Information Center

    American Association of University Professors, 2011

    2011-01-01

    This paper presents a supplementary report on the Savannah College of Art and Design (SCAD) censure. Placement of the Savannah College of Art and Design on the Association's censure list, by the 1993 annual meeting, followed from the SCAD administration's dismissal of two faculty members without having demonstrated cause, thereby denying them…

  10. Final Technical Report - Kotzebue Wind Power Porject - Volume I

    SciTech Connect

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-26

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  11. Report on aging of nuclear power plant reinforced concrete structures

    SciTech Connect

    Naus, D.J.; Oland, C.B.; Ellingwood, B.R.

    1996-03-01

    The Structural Aging Program provides the US Nuclear Regulatory Commission with potential structural safety issues and acceptance criteria for use in continued service assessments of nuclear power plant safety-related concrete structures. The program was organized under four task areas: Program Management, Materials Property Data Base, Structural Component Assessment/Repair Technology, and Quantitative Methodology for Continued Service Determinations. Under these tasks, over 90 papers and reports were prepared addressing pertinent aspects associated with aging management of nuclear power plant reinforced concrete structures. Contained in this report is a summary of program results in the form of information related to longevity of nuclear power plant reinforced concrete structures, a Structural Materials Information Center presenting data and information on the time variation of concrete materials under the influence of environmental stressors and aging factors, in-service inspection and condition assessments techniques, repair materials and methods, evaluation of nuclear power plant reinforced concrete structures, and a reliability-based methodology for current and future condition assessments. Recommendations for future activities are also provided. 308 refs., 61 figs., 50 tabs.

  12. Solar thermal power systems. Annual technical progress report, FY 1979

    SciTech Connect

    Braun, Gerald W.

    1980-06-01

    The Solar Thermal Power Systems Program is the key element in the national effort to establish solar thermal conversion technologies within the major sectors of the national energy market. It provides for the development of concentrating mirror/lens heat collection and conversion technologies for both central and dispersed receiver applications to produce electricity, provide heat at its point of use in industrial processes, provide heat and electricity in combination for industrial, commercial, and residential needs, and ultimately, drive processes for production of liquid and gaseous fuels. This report is the second Annual Technical Progress Report for the Solar Thermal Power Systems Program and is structured according to the organization of the Solar Thermal Power Systems Program on September 30, 1979. Emphasis is on the technical progress of the projects rather than on activities and individual contractor efforts. Each project description indicates its place in the Solar Thermal Power Systems Program, a brief history, the significant achievements and real progress during FY 1979, also future project activities as well as anticipated significant achievements are forecast. (WHK)

  13. Final Technical Report - Kotzebue Wind Power Project - Volume II

    SciTech Connect

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  14. UTC Power/Delphi SECA CBS Final Report

    SciTech Connect

    Gorman, Michael; Kerr, Rich

    2013-04-04

    The subject report summarizes the results of solid oxide fuel cell development conducted by UTC Power in conjunction with Delphi Automotive Systems under a cost-share program with from October 2008 through March of 2013. Over that period Delphi Automotive Systems developed a nearly four times larger area solid oxide fuel cell stack capable of operating on pre-reformed natural gas and simulated coal gas with durability demonstrated to 5,000 hours and projected to exceed 10,000 hours. The new stack design was scaled to 40-cell stacks with power output in excess of 6.25kW. Delphi also made significant strides in improving the manufacturability, yield and production cost of these solid oxide fuel cells over the course of the program. Concurrently, UTC Power developed a conceptual design for a 120 MW Integrated Gasification Fuel Cell (IGFC) operating on coal syngas with as high as 57% Higher Heating Value (HHV) efficiency as a measure of the feasibility of the technology. Subsequently a 400 kW on-site system preliminary design with 55% Lower Heating Value (LHV) efficiency operating on natural gas was down-selected from eighteen candidate designs. That design was used as the basis for a 25kW breadboard power plant incorporating four Delphi cell stacks that was tested on natural gas before the program was discontinued due to the sale of UTC Power in early 2013. Though the program was cut short of the endurance target of 3,000 hours, many aspects of the technology were proven including: large-area, repeatable cell manufacture, cell stack operation on simulated coal gas and natural gas and integrated power plant operation on natural gas. The potential of the technology for high efficiency stationary electric power generation is clear. Acceptable production costs, durability, and reliability in real world environments are the remaining challenges to commercialization.

  15. Malawi 1984 Final Training Report. Volume I: Administrative Summary. Volume II: Details of Sessions and Experiences.

    ERIC Educational Resources Information Center

    Clariana, Roy B.

    This combination project report and training guide describes the 1984 training program for Peace Corps volunteers in Malawi and includes most of the training materials used during the project. The first half of the package, an administrative summary of the training program, includes the following: a statement of the program's philosophy, goals,…

  16. Studies of Special Education Administrative Involvement in Computer Implementation. Final Report--Phase I.

    ERIC Educational Resources Information Center

    Robey, Elaine; And Others

    The study reported in this document examined how special education administrators and staff in 100 school districts were involved in the adoption of new educational technology. The sample was drawn from the known population list of operating school districts from the Common Core of Data of the National Center for Educational Statistics. Selection…

  17. The Administrator of a Special Library or Information Center and His Situation. Final Report

    ERIC Educational Resources Information Center

    Bundy, Mary Lee; And Others

    In the study of the special library and information center administrator, a sample of 150 special libraries and information centers reporting staffs of ten people or more was selected. Ninety-five respondents completed and returned the questionnaires. Full details of sample choice and design and an analysis of the returns are contained in the…

  18. The Social Security Administration's Youth Transition Demonstration Projects: Interim Report on Transition WORKS

    ERIC Educational Resources Information Center

    Fraker, Thomas; Black, Alison; Mamun, Arif; Manno, Michelle; Martinez, John; O'Day, Bonnie; O'Toole, Meghan; Rangarajan, Anu; Reed, Debbie

    2011-01-01

    The Social Security Administration is funding a random assignment evaluation of six demonstration projects to improve employment and other outcomes for youth ages 14 to 25 who are either receiving disability benefits or are at high risk of receiving them in the future. This report reviews the Youth Transition Demonstration (YTD) projects, located…

  19. 7 CFR 1032.45 - Market administrator's reports and announcements concerning classification.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Market administrator's reports and announcements concerning classification. 1032.45 Section 1032.45 Agriculture Regulations of the Department of Agriculture... MILK IN THE CENTRAL MARKETING AREA Order Regulating Handling Classification of Milk § 1032.45...

  20. 7 CFR 1032.45 - Market administrator's reports and announcements concerning classification.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 9 2012-01-01 2012-01-01 false Market administrator's reports and announcements concerning classification. 1032.45 Section 1032.45 Agriculture Regulations of the Department of Agriculture... MILK IN THE CENTRAL MARKETING AREA Order Regulating Handling Classification of Milk § 1032.45...

  1. 7 CFR 1032.45 - Market administrator's reports and announcements concerning classification.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 9 2011-01-01 2011-01-01 false Market administrator's reports and announcements concerning classification. 1032.45 Section 1032.45 Agriculture Regulations of the Department of Agriculture... MILK IN THE CENTRAL MARKETING AREA Order Regulating Handling Classification of Milk § 1032.45...

  2. 7 CFR 1032.45 - Market administrator's reports and announcements concerning classification.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 9 2014-01-01 2013-01-01 true Market administrator's reports and announcements concerning classification. 1032.45 Section 1032.45 Agriculture Regulations of the Department of Agriculture... MILK IN THE CENTRAL MARKETING AREA Order Regulating Handling Classification of Milk § 1032.45...

  3. 7 CFR 1032.45 - Market administrator's reports and announcements concerning classification.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 9 2013-01-01 2013-01-01 false Market administrator's reports and announcements concerning classification. 1032.45 Section 1032.45 Agriculture Regulations of the Department of Agriculture... MILK IN THE CENTRAL MARKETING AREA Order Regulating Handling Classification of Milk § 1032.45...

  4. 22 CFR 128.9 - Proceedings before and report of Administrative Law Judge.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Proceedings before and report of Administrative Law Judge. 128.9 Section 128.9 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS... shall be transmitted to the Assistant Secretary for Political-Military Affairs, Department of State. ...

  5. A Study of the Administration and Operation of Vocational-Technical Education Programs. [Interim BOAE Report].

    ERIC Educational Resources Information Center

    National Advisory Council on Vocational Education, Washington, DC.

    In compliance with legislative authority, the National Advisory Council on Vocational Education approved a two-year study of the United States Bureau of Occupational and Adult Education (BOAE). The study was to be conducted in two phases. Phase I (reported here) sought out current problems in the administration and operation of vocational…

  6. 40 CFR 600.312-86 - Labeling, reporting, and recordkeeping; Administrator reviews.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) ENERGY POLICY FUEL ECONOMY AND CARBON-RELATED EXHAUST EMISSIONS OF MOTOR VEHICLES Fuel Economy Regulations for 1977 and Later Model Year Automobiles-Labeling § 600.312-86 Labeling, reporting, and... data sufficient to calculate the label values, to the Administrator according to the...

  7. 40 CFR 600.312-86 - Labeling, reporting, and recordkeeping; Administrator reviews.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) ENERGY POLICY FUEL ECONOMY AND CARBON-RELATED EXHAUST EMISSIONS OF MOTOR VEHICLES Fuel Economy Regulations for 1977 and Later Model Year Automobiles-Labeling § 600.312-86 Labeling, reporting, and... data sufficient to calculate the label values, to the Administrator according to the...

  8. 40 CFR 600.312-08 - Labeling, reporting, and recordkeeping; Administrator reviews.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Labeling, reporting, and recordkeeping; Administrator reviews. 600.312-08 Section 600.312-08 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY AND GREENHOUSE GAS EXHAUST EMISSIONS OF MOTOR VEHICLES Fuel...

  9. 40 CFR 600.312-08 - Labeling, reporting, and recordkeeping; Administrator reviews.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 31 2012-07-01 2012-07-01 false Labeling, reporting, and recordkeeping; Administrator reviews. 600.312-08 Section 600.312-08 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY AND GREENHOUSE GAS EXHAUST EMISSIONS OF MOTOR VEHICLES Fuel...

  10. MAVA [Massachusetts Association of Vocational Administrators] 1972 Summer Workshops and Professional Improvement Project. Final Report.

    ERIC Educational Resources Information Center

    Massachusetts State Dept. of Education, Boston. Div. of Occupational Education.

    The Massachusetts Association of Vocational Administrators (MAVA), with the assistance of the State Division of Occupational Education, developed a series of four-day, in service workshops aimed at vocational teachers throughout the State, and the document provides a final report of this project's first year. Part One covers general information…

  11. Experiencing the Progress Report: An Analysis of Gender and Administration in Doctoral Candidature

    ERIC Educational Resources Information Center

    Mewburn, Inger; Cuthbert, Denise; Tokareva, Ekaterina

    2014-01-01

    Most universities around the world put in place administrative processes and systems to manage student progress. These processes usually involve filling out standardised forms and instruments: managerial tools intended to increase transparency, promote efficiency and ensure fairness by applying the same standards to all. The progress report is a…

  12. Final Scientific Report - Wind Powering America State Outreach Project

    SciTech Connect

    Sinclair, Mark; Margolis, Anne

    2012-02-01

    The goal of the Wind Powering America State Outreach Project was to facilitate the adoption of effective state legislation, policy, finance programs, and siting best practices to accelerate public acceptance and development of wind energy. This was accomplished by Clean Energy States Alliance (CESA) through provision of informational tools including reports and webinars as well as the provision of technical assistance to state leaders on wind siting, policy, and finance best practices, identification of strategic federal-state partnership activities for both onshore and offshore wind, and participation in regional wind development collaboratives. The Final Scientific Report - Wind Powering America State Outreach Project provides a summary of the objectives, activities, and outcomes of this project as accomplished by CESA over the period 12/1/2009 - 11/30/2011.

  13. JTEC panel report on nuclear power in Japan. Executive summary

    SciTech Connect

    Hansen, K.F.; Behnke, W.B.; Cousin, S.B.; Evans, E.A.; Olander, D.R.

    1990-10-01

    The report examines the status and direction of nuclear power-related research and development in Japan in six areas: the nuclear fuel cycle, nuclear materials, instrumentation and control technology, CAD/CAM, nuclear safety research, and nuclear plant construction. The report is based on a review of literature and one week trip to Japan in January 1990 during which the members of the Panel visited numerous Japanese laboratories and other nuclear facilities. The overall findings of the Panel suggest that the nuclear power industry in Japan is at an advanced state of development; in particular, Japan is now technologically self-sufficient. Long-term goals of the Japanese program include closure of the complete fuel cycle and pursuit of the liquid metal fast breeder reactor as the future base system.

  14. Fusion Power Program biannual progress report, April-September 1979

    SciTech Connect

    Not Available

    1980-02-01

    This biannual report summarizes the Argonne National Laboratory work performed for the Office of Fusion Energy during the April-September 1979 quarter in the following research and development areas: materials; energy storage and transfer; tritium containment, recovery and control; advanced reactor design; atomic data; reactor safety; fusion-fission hybrid systems; alternate applications of fusion energy; and other work related to fusion power. Separate abstracts were prepared for three sections. (MOW)

  15. DRESS Syndrome Caused by Cross-reactivity Between Vancomycin and Subsequent Teicoplanin Administration: A Case Report

    PubMed Central

    Miyazu, Daisuke; Kodama, Nobuhiro; Yamashita, Daiki; Tanaka, Hirokazu; Inoue, Sachiko; Imakyure, Osamu; Hirakawa, Masaaki; Shuto, Hideki; Kataoka, Yasufumi

    2016-01-01

    Patient: Male, 79 Final Diagnosis: DRESS Symptoms: Eosinophilia • fever • interstitial pneumonitis • skin rash Medication: Teicoplanin • vancomycin Clinical Procedure: — Specialty: Infectious Diseases Objective: Adverse events of drug therapy Background: Drug reaction with eosinophilia and systemic symptoms (DRESS) syndrome is a potentially life-threatening syndrome comprising severe skin eruption, fever, eosinophilia, lymphadenopathy, and involvement of internal organs. Here, we describe a case of DRESS syndrome caused by cross-reactivity between vancomycin and subsequent teicoplanin administration. Case Report: A 79-year-old male was admitted to our hospital for the treatment of injuries incurred in a traffic accident. Eosinophilia and lung dysfunction appeared after vancomycin administration. These symptoms were improved temporarily by withdrawal of vancomycin and administration of corticosteroid, but exacerbated by subsequent teicoplanin administration. These symptoms disappeared after discontinuation of teicoplanin. Based on comprehensive assessment of the overall clinical course, we judged that DRESS syndrome was induced by cross-reactivity between vancomycin and subsequent teicoplanin administration. Using the European Registry of Severe Cutaneous Adverse Reactions (RegiSCAR) scoring system, we categorized DRESS syndrome related to vancomycin and teicoplanin as “probable.” We describe, for the first time, DRESS syndrome (defined using the RegiSCAR scoring system) caused by cross-reactivity between vancomycin and subsequent teicoplanin administration. Conclusions: Clinicians should be aware that DRESS syndrome can be induced by cross-reactivity between vancomycin and teicoplanin. PMID:27572807

  16. DRESS Syndrome Caused by Cross-reactivity Between Vancomycin and Subsequent Teicoplanin Administration: A Case Report.

    PubMed

    Miyazu, Daisuke; Kodama, Nobuhiro; Yamashita, Daiki; Tanaka, Hirokazu; Inoue, Sachiko; Imakyure, Osamu; Hirakawa, Masaaki; Shuto, Hideki; Kataoka, Yasufumi

    2016-08-30

    BACKGROUND Drug reaction with eosinophilia and systemic symptoms (DRESS) syndrome is a potentially life-threatening syndrome comprising severe skin eruption, fever, eosinophilia, lymphadenopathy, and involvement of internal organs. Here, we describe a case of DRESS syndrome caused by cross-reactivity between vancomycin and subsequent teicoplanin administration. CASE REPORT A 79-year-old male was admitted to our hospital for the treatment of injuries incurred in a traffic accident. Eosinophilia and lung dysfunction appeared after vancomycin administration. These symptoms were improved temporarily by withdrawal of vancomycin and administration of corticosteroid, but exacerbated by subsequent teicoplanin administration. These symptoms disappeared after discontinuation of teicoplanin. Based on comprehensive assessment of the overall clinical course, we judged that DRESS syndrome was induced by cross-reactivity between vancomycin and subsequent teicoplanin administration. Using the European Registry of Severe Cutaneous Adverse Reactions (RegiSCAR) scoring system, we categorized DRESS syndrome related to vancomycin and teicoplanin as "probable." We describe, for the first time, DRESS syndrome (defined using the RegiSCAR scoring system) caused by cross-reactivity between vancomycin and subsequent teicoplanin administration. CONCLUSIONS Clinicians should be aware that DRESS syndrome can be induced by cross-reactivity between vancomycin and teicoplanin.

  17. Multimegawatt space nuclear power supply: Phase 1, Final report

    SciTech Connect

    Not Available

    1989-02-17

    The preliminary safety assessment report analyzes the potential radiological risk of the integrated MSNPS with the launch vehicle including interface with the weapon system. Most emphasis will be placed the prime power concept design. Safety problems can occur any time during the entire life cycle of the system including contingency phases. The preliminary safety assessment report is to be delivered at the end of phase 2. This assessment will be the basis of the safety requirements which will be applied to the design of the MSNPS as it develops in subsequent phases. The assessment also focuses design activities on specific high-risk scenarios and missions that may impact safety.

  18. Regulatory process for decommissioning nuclear power reactors. Final report

    SciTech Connect

    1998-03-01

    This report provides regulatory guidance for utilities consistent with the changes in the decommissioning rule, 10 CFR50.82 as revised in July 1996. The purpose of this report is to explain the new rule in the context of related industry experience and to provide practical guidance to licensees contemplating or implementing a shutdown. Because the regulatory process is still rapidly evolving, this report reflects only a current status of the acceptable methods and practices derived from a review of the current regulations, guidance documents and industry experience for decommissioning a nuclear power reactor. EPRI anticipates periodic updates of this document to incorporate various utility experiences with decommissioning, and also to reflect any regulatory changes. The report provides a summary of ongoing federal agency and industry activities and the regulatory requirements that are currently applicable, or no longer applicable, to nuclear power plants at the time of permanent shutdown through the early decommissioning stage. The report describes the major components of a typical decommissioning action plan, providing industry experience and guidance for licensees considering or implementing permanent shutdown.

  19. 78 FR 65641 - Recommendation From the Western Area Power Administration To Pursue Regional Transmission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... formal negotiations with the Southwest Power Pool (SPP), a Regional Transmission Organization (RTO... other stakeholders regarding its recommendation to pursue formal negotiations with SPP regarding... forward with formal negotiations with SPP will result in detailed membership discussions consistent with...

  20. Multifunctional data acquisition and analysis and optical sensors: a Bonneville Power Administration (BPA) update

    NASA Astrophysics Data System (ADS)

    Erickson, Dennis C.; Donnelly, Matt K.

    1995-04-01

    The authors present a design concept describing a multifunctional data acquisition and analysis architecture for advanced power system monitoring. The system is tailored to take advantage of the salient features of low energy sensors, particularly optical types. The discussion of the system concept and optical sensors is based on research at BPA and PNL and on progress made at existing BPA installations and other sites in the western power system.

  1. Annual committee reports on significant legislative, judicial, and administrative developments in 1981: Environmental-Quality Committee

    SciTech Connect

    Not Available

    1982-01-01

    The committee found significant developments under the National Environmental Policy Act (NEPA). There were no amendments to NEPA, but there were new rules affecting DOE defense-related nuclear facilities. Judicial developments continued a deference to agency discretion in environmental impact statement issues and conflicts with other laws. The administration's budget cuts effectively disabled the Council on Environmental Quality (CEQ). The report also outlines significant legislative, judicial, and administrative developments for the Federal Insecticide, Fungicide, and Rodenticide Act, the Endangered Species Act, and the Toxic Substances Act. 188 references. (DCK)

  2. 5 CFR 2423.31 - Powers and duties of the Administrative Law Judge at the hearing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Law Judge at the hearing. 2423.31 Section 2423.31 Administrative Personnel FEDERAL LABOR RELATIONS AUTHORITY, GENERAL COUNSEL OF THE FEDERAL LABOR RELATIONS AUTHORITY AND FEDERAL SERVICE IMPASSES PANEL FEDERAL LABOR RELATIONS AUTHORITY AND GENERAL COUNSEL OF THE FEDERAL LABOR RELATIONS AUTHORITY...

  3. Status limbo: analysis of nurse faculty member reports of administrator response to workplace bullying complaints.

    PubMed

    Dzurec, Laura Cox

    2013-01-01

    Increasing concern about bullying among adults in workplaces is notable internationally. Unlike blatant physical bullying, workplace bullying often involves bullies' dismissive, demeaning, and typically surreptitious, one-on-one communications with their intended victims. These communications challenge recognition when they are examined beyond the interpersonal margins of the bully-victim dyad. Thus, they tend to elude formal, administrative reproach, despite the negative, long-term outcomes they herald for workplace employees--those immediately involved as victims and those who are bystanders--and for employing organizations and the consumers they serve. This article offers a hermeneutic analysis of workplace bullying victims' narrative reports of administrator responses to their complaints of having been bullied at work. Analysis demonstrated respondent perceptions of the variability and unevenness of administrative responses to their reports and, more broadly, respondents' collective sense of administrative abandonment. That sense is characterized in this report as status limbo, a term employed by Facebook users to represent a state of perceived neglect and oblivion. © 2013 Elsevier Inc. All rights reserved.

  4. Silicone gel breast implant adverse event reports to the Food and Drug Administration, 1984-1995.

    PubMed Central

    Brown, S L; Parmentier, C M; Woo, E K; Vishnuvajjala, R L; Headrick, M L

    1998-01-01

    OBJECTIVES: To characterize the adverse event reports on silicone gel breast implants (SGBIs), including death reports, submitted to the Food and Drug Administration (FDA) from 1984 through 1995 and to analyze changes in the type and complexity of reports following extensive media coverage of breast implants. METHODS: The authors analyzed mandatory and voluntary reports from the adverse events reporting system for medical devices at the FDA. RESULTS: In 1988, adverse event reports related to SGBIs accounted for 2.4% of the 14,473 mandatory reports entered into the FDA database on medical devices. In 1992, SGBI-related reports accounted for 30.3% of the total 66,476 mandatory reports of adverse events. The most frequently reported adverse event in 1988, before the widespread publicity on breast implants, was implant burst or rupture. In contrast, in 1992 the most frequently reported event was reaction, a term used to describe a range of adverse effects. CONCLUSIONS: The numbers of mandatory and voluntary reports of SGBI-related adverse events increased exponentially, as did the complexity of the reports, following publicity over the lack of safety data on breast implants and a short voluntary moratorium on their sale. A significant proportion of reports lacked information on specific medical symptoms or diagnoses. PMID:9847926

  5. Multiple perforations and fistula formation following corticosteroid administration: A case report

    PubMed Central

    He, Jing-Ni; Tian, Zhong; Yao, Xu; Li, Hang-Yu; Yu, Yun; Liu, Yuan; Liu, Jin-Gang

    2017-01-01

    Eosinophilic granulomatosis with polyangiitis (EGPA) is a rare systemic small- and medium-sized-vessel vasculitis. The literature contains only a few reports of gastrointestinal perforation with this condition. We report a patient with EPGA treated with high-dose steroid who underwent emergency surgery for intestinal perforations. We performed a simple repair of the 11 perforations. Intestinal fistulas developed 8 d postoperatively; they healed well after 60 d of continuous washing and negative pressure suction. The clinical data of 14 additional patients with EGPA or Churg-Strauss syndrome complicated with gastrointestinal perforation, which were reported from 1996 to 2014, were also collected and compared. The formation of multiple perforations and fistulas following high dosage steroid administration can have a good outcome with appropriate management. Meticulous attention to abdominal symptoms and appropriate interventions can result in timely management. Corticosteroid administration remains a very important perioperative procedure for EPGA. PMID:28255551

  6. Multiple perforations and fistula formation following corticosteroid administration: A case report.

    PubMed

    He, Jing-Ni; Tian, Zhong; Yao, Xu; Li, Hang-Yu; Yu, Yun; Liu, Yuan; Liu, Jin-Gang

    2017-02-16

    Eosinophilic granulomatosis with polyangiitis (EGPA) is a rare systemic small- and medium-sized-vessel vasculitis. The literature contains only a few reports of gastrointestinal perforation with this condition. We report a patient with EPGA treated with high-dose steroid who underwent emergency surgery for intestinal perforations. We performed a simple repair of the 11 perforations. Intestinal fistulas developed 8 d postoperatively; they healed well after 60 d of continuous washing and negative pressure suction. The clinical data of 14 additional patients with EGPA or Churg-Strauss syndrome complicated with gastrointestinal perforation, which were reported from 1996 to 2014, were also collected and compared. The formation of multiple perforations and fistulas following high dosage steroid administration can have a good outcome with appropriate management. Meticulous attention to abdominal symptoms and appropriate interventions can result in timely management. Corticosteroid administration remains a very important perioperative procedure for EPGA.

  7. Using administrative medical claims data to supplement state disease registry systems for reporting zoonotic infections

    PubMed Central

    Coulter, Steven; Conner, William

    2013-01-01

    Objective To determine what, if any, opportunity exists in using administrative medical claims data for supplemental reporting to the state infectious disease registry system. Materials and methods Cases of five tick-borne (Lyme disease (LD), babesiosis, ehrlichiosis, Rocky Mountain spotted fever (RMSF), tularemia) and two mosquito-borne diseases (West Nile virus, La Crosse viral encephalitis) reported to the Tennessee Department of Health during 2000–2009 were selected for study. Similarly, medically diagnosed cases from a Tennessee-based managed care organization (MCO) claims data warehouse were extracted for the same time period. MCO and Tennessee Department of Health incidence rates were compared using a complete randomized block design within a general linear mixed model to measure potential supplemental reporting opportunity. Results MCO LD incidence was 7.7 times higher (p<0.001) than that reported to the state, possibly indicating significant under-reporting (∼196 unreported cases per year). MCO data also suggest about 33 cases of RMSF go unreported each year in Tennessee (p<0.001). Three cases of babesiosis were discovered using claims data, a significant finding as this disease was only recently confirmed in Tennessee. Discussion Data sharing between MCOs and health departments for vaccine information already exists (eg, the Vaccine Safety Datalink Rapid Cycle Analysis project). There may be a significant opportunity in Tennessee to supplement the current passive infectious disease reporting system with administrative claims data, particularly for LD and RMSF. Conclusions There are limitations with administrative claims data, but health plans may help bridge data gaps and support the federal administration's vision of combining public and private data into one source. PMID:22811492

  8. 20 CFR 404.452 - Reports to Social Security Administration of earnings; wages; net earnings from self-employment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Reports to Social Security Administration of...; and Nonpayments of Benefits § 404.452 Reports to Social Security Administration of earnings; wages...) Information required. If you are the beneficiary, your report should show your name, address, Social...

  9. 20 CFR 404.452 - Reports to Social Security Administration of earnings; wages; net earnings from self-employment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Reports to Social Security Administration of...; and Nonpayments of Benefits § 404.452 Reports to Social Security Administration of earnings; wages...) Information required. If you are the beneficiary, your report should show your name, address, Social...

  10. 20 CFR 404.452 - Reports to Social Security Administration of earnings; wages; net earnings from self-employment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Reports to Social Security Administration of...; and Nonpayments of Benefits § 404.452 Reports to Social Security Administration of earnings; wages...) Information required. If you are the beneficiary, your report should show your name, address, Social...

  11. 20 CFR 404.452 - Reports to Social Security Administration of earnings; wages; net earnings from self-employment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Reports to Social Security Administration of...; and Nonpayments of Benefits § 404.452 Reports to Social Security Administration of earnings; wages...) Information required. If you are the beneficiary, your report should show your name, address, Social...

  12. 20 CFR 404.452 - Reports to Social Security Administration of earnings; wages; net earnings from self-employment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Reports to Social Security Administration of...; and Nonpayments of Benefits § 404.452 Reports to Social Security Administration of earnings; wages...) Information required. If you are the beneficiary, your report should show your name, address, Social...

  13. 10 CFR 455.123 - Grantee records and reports for State grants for administrative expenses, technical assistance...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....123 Grantee records and reports for State grants for administrative expenses, technical assistance... institutions participating in the technical assistance phase of this program and upon the energy use reports... to time request. (c) Each copy of any report covering grants for State administrative,...

  14. 10 CFR 455.123 - Grantee records and reports for State grants for administrative expenses, technical assistance...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....123 Grantee records and reports for State grants for administrative expenses, technical assistance... institutions participating in the technical assistance phase of this program and upon the energy use reports... to time request. (c) Each copy of any report covering grants for State administrative,...

  15. 10 CFR 455.123 - Grantee records and reports for State grants for administrative expenses, technical assistance...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....123 Grantee records and reports for State grants for administrative expenses, technical assistance... institutions participating in the technical assistance phase of this program and upon the energy use reports... to time request. (c) Each copy of any report covering grants for State administrative,...

  16. 10 CFR 455.123 - Grantee records and reports for State grants for administrative expenses, technical assistance...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....123 Grantee records and reports for State grants for administrative expenses, technical assistance... institutions participating in the technical assistance phase of this program and upon the energy use reports... to time request. (c) Each copy of any report covering grants for State administrative,...

  17. 10 CFR 455.123 - Grantee records and reports for State grants for administrative expenses, technical assistance...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....123 Grantee records and reports for State grants for administrative expenses, technical assistance... institutions participating in the technical assistance phase of this program and upon the energy use reports... to time request. (c) Each copy of any report covering grants for State administrative,...

  18. Power Management and Distribution (PMAD) Model Development: Final Report

    NASA Technical Reports Server (NTRS)

    Metcalf, Kenneth J.

    2011-01-01

    Power management and distribution (PMAD) models were developed in the early 1990's to model candidate architectures for various Space Exploration Initiative (SEI) missions. They were used to generate "ballpark" component mass estimates to support conceptual PMAD system design studies. The initial set of models was provided to NASA Lewis Research Center (since renamed Glenn Research Center) in 1992. They were developed to estimate the characteristics of power conditioning components predicted to be available in the 2005 timeframe. Early 90's component and device designs and material technologies were projected forward to the 2005 timeframe, and algorithms reflecting those design and material improvements were incorporated into the models to generate mass, volume, and efficiency estimates for circa 2005 components. The models are about ten years old now and NASA GRC requested a review of them to determine if they should be updated to bring them into agreement with current performance projections or to incorporate unforeseen design or technology advances. This report documents the results of this review and the updated power conditioning models and new transmission line models generated to estimate post 2005 PMAD system masses and sizes. This effort continues the expansion and enhancement of a library of PMAD models developed to allow system designers to assess future power system architectures and distribution techniques quickly and consistently.

  19. Evaluating adverse drug event reporting in administrative data from emergency departments: a validation study

    PubMed Central

    2013-01-01

    Background Adverse drug events are a frequent cause of emergency department presentations. Administrative data could be used to identify patients presenting with adverse drug events for post-market surveillance, and to conduct research in patient safety and in drug safety and effectiveness. However, such data sources have not been evaluated for their completeness with regard to adverse drug event reporting. Our objective was to determine the proportion of adverse drug events to outpatient medications diagnosed at the point-of-care in emergency departments that were documented in administrative data. Methods We linked the records of patients enrolled in a prospective observational cohort study on adverse drug events conducted in two Canadian tertiary care emergency departments to their administrative data. We compared the number of adverse drug events diagnosed and recorded at the point-of-care in the prospective study with the number of adverse drug events recorded in the administrative data. Results Among 1574 emergency department visits, 221 were identified as adverse drug event-related in the prospective database. We found 15 adverse drug events documented in administrative records with ICD-10 codes clearly indicating an adverse drug event, indicating a sensitivity of 6.8% (95% CI 4.0–11.2%) of this code set. When the ICD-10 code categories were broadened to include codes indicating a very likely, likely or possible adverse event to a medication, 62 of 221 events were identifiable in administrative data, corresponding to a sensitivity of 28.1% (95% CI 22.3-34.6%). Conclusions Adverse drug events to outpatient medications were underreported in emergency department administrative data compared to the number of adverse drug events diagnosed and recorded at the point-of-care. PMID:24219303

  20. Adverse drug reaction reporting related to the administration of antibiotics in hospitalized pediatric patients in Greece.

    PubMed

    Toska, Aikaterini; Mary, Geitona; Kyriakos, Souliotis; Maria, Saridi; Costas, Demetzos

    2014-03-01

    Pharmacosurveillance during the administration of antibiotics is of extreme importance in paediatric patients given their different physiology and adverse drug reaction (ADR) profile compared to the adult population. Systematic reviews show that one in ten hospitalised children will experience ADRs. Administration of antibiotics is among the leading causes of such ADRs. The aim of this study was to assess ADRs reporting related to the administration of antibiotics in hospitalized paediatric patients in Greece. A cross-sectional study was conducted over a seven month period (January to July 2012) in paediatric departments in Greece. A self-administered questionnaire was distributed to a total of 750 health professionals providing paediatric care in 3 specialized paediatric hospitals and 33 paediatric departments in general and university hospitals. Descriptive and multivariate statistical analyses were performed. Levels of significance were two-tailed and statistical significance was set at P =0.05. Overall, 576 out of 750 questionnaires were returned completed, at a response rate of 76.8%. ADRs related to antibiotics were reported by 44.8% of nurses and 23.7% of doctors as occurring often/very often during their practice. 45% of doctors reported amoxicillin/clavulanic acid as the drug with the most frequent ADRs. Overall, 63% of nurses and 32.7% of doctors stated they had never reported ADRs. Doctors used yellow cards more often than nurses (65.2% vs 33.9%). Only 48.4% of doctors and 35.9% of nurses knew that ADR reporting constitutes part of their professional duties. ADRs following antibiotic administration are common in paediatric practice in Greece; however, underreporting remains a significant problem.

  1. Fugitive emissions from coal-fired power plants. Final report

    SciTech Connect

    Currier, E.L.; Neal, B.D.

    1984-06-01

    Potential sources of airborne and waterborne fugitive emissions at coal-fired power plants are identified and discussed. Fugitive emissions are defined as pollutant discharges that do not pass through a chimney, vent, discharge pipe, or other functionally equivalent opening. A search of the literature was conducted to locate, evaluate, and report the available data pertaining to such emissions. Data from various reports and studies are discussed and rated according to a validity rating system. Control methods and efficiencies are also discussed. Despite the uncertainty in much of the information in the literature, the most reliable data were selected and were used to estimate the quantity and quality of fugitive emissions from two hypothetical 500 MW coal-fired power plants. Airborne fugitive emissions consist primarily of particulate matter from coal handling and storage, ash handling and disposal, and vehicular traffic. Airborne fugitive emissions from a typical, well-controlled, 500 MW power plant were estimated to amount to about 71 to 75 metric tons/year. This is about 20 percent as much particulate matter as would be emitted from the boiler stack. Waterborne fugitive emissions from coal-fired power plants are comprised mainly of any uncollected and uncontrolled coal pile surface runoff or drainage and any uncollected and uncontrolled leachate from ash/sludge disposal areas. Drainage from coal piles containing eastern coal can be expected to be low in pH and any surface runoff can be expected to contain high concentrations of total suspended solids; drainage from western coal piles appears to be near neutral in pH. Leachate from ash disposal sites may contain high concentrations of total dissolved solids and trace elements. 62 references, 64 tables.

  2. Precise Time Dissemination and Applications Development on the Bonneville Power Administration System

    DTIC Science & Technology

    1991-12-01

    develop and verify the necessary strategies, hardware, and software. HVDC Modulation HVDC systems are powerful tools for improving the transient and...an AC line to modulate the parallel HVDC link. Damping of oscillations in the AC grid can also be achieved by using the rate of change of voltage

  3. 5 CFR 2423.24 - Powers and duties of the Administrative Law Judge during prehearing proceedings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... LABOR RELATIONS AUTHORITY, GENERAL COUNSEL OF THE FEDERAL LABOR RELATIONS AUTHORITY AND FEDERAL SERVICE IMPASSES PANEL FEDERAL LABOR RELATIONS AUTHORITY AND GENERAL COUNSEL OF THE FEDERAL LABOR RELATIONS AUTHORITY UNFAIR LABOR PRACTICE PROCEEDINGS Post Complaint, Prehearing Procedures § 2423.24 Powers and...

  4. Advances in space power research and technology at the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Mullin, J. P.; Randolph, L. P.; Hudson, W. R.; Ambrus, J. H.

    1981-01-01

    Progress and plans in various areas of the NASA Space Power Program are discussed. Solar cell research is narrowed to GaAs, multibandgap, and thin Si cells for arrays in planar and concentrator configurations, with further work to increase cell efficiency, radiation hardness, develop flexible encapsulants, and reduce cost. Electrochemical research is concentrating on increasing energy and power density, cycle and wet stand life, reliability and cost reduction of batteries. Further development of the Ni-H2 battery and O2-H2 fuel cell to multihundred kW with a 5 year life and 30,000 cycles is noted. Basic research is ongoing for alkali metal anodes for high energy density secondary cells. Nuclear thermoelectric propulsion is being developed for outer planets exploration propulsion systems, using Si-Ge generators, and studies with rare earth chalcogenides and sulfides are mentioned. Power Systems Management seeks to harmonize increasing power supply levels with inner and outer spacecraft environments, circuits, demands, and automatic monitoring. Concomitant development of bipolar transistors, an infrared rectenna, spacecraft charging measurement, and larger heat pipe transport capacity are noted.

  5. Women in Educational Administration: Moving from a Paradigm of Power and Control to Empowerment and Equality.

    ERIC Educational Resources Information Center

    Smith, Francie

    Factors in the development of empowerment through ethical leadership are discussed in this paper, which draws on feminist and humanist theories. A review of literature describes the conditions in patriarchal societies that lead to and lessen the exaltation of power and control; conditions of temporary and permanent inequality; ways in which…

  6. 76 FR 15221 - Organization and Delegation of Powers and Duties; Assistant Secretary for Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-21

    ... 49 CFR Part 1 RIN 9991-AA56 Organization and Delegation of Powers and Duties; Assistant Secretary for... Security Act of 2007 (Act) (Pub. L. 110-140; December 19, 2007) to the Assistant Secretary for... was signed into law. Title 49 of the Code of Federal Regulations (CFR) 1.59 delegates to the Assistant...

  7. Aluminum granuloma after administration of the quadrivalent human papillomavirus vaccine. Report of a case.

    PubMed

    Marsee, Derek K; Williams, John M; Velazquez, Elsa F

    2008-12-01

    We report the case of a young woman who developed a subcutaneous granulomatous response after administration of the quadrivalent human papillomavirus vaccine. The inciting agent was most likely an aluminum adjuvant, which previously has been reported to be associated with a granulomatous response after administration of other vaccines. Histologically, the lesion consisted of a necrotic/necrobiotic center surrounded by palisading epithelioid histiocytes closely resembling deep granuloma annulare or rheumatoid nodule. The histiocytes contained abundant intracytoplasmic violaceous/gray granular material. An ammonium aurintricarboxylate (Aluminon) stain demonstrated the presence of aluminum in the granular material. Aluminum granulomas should be included in the differential diagnosis of deep granulomatous reaction in young women, due to the high frequency of vaccination in this population.

  8. The Relationship Between Nursing Experience and Education and the Occurrence of Reported Pediatric Medication Administration Errors.

    PubMed

    Sears, Kim; O'Brien-Pallas, Linda; Stevens, Bonnie; Murphy, Gail Tomblin

    2016-01-01

    Medication errors are one of the most common incidents in the hospitals. They can be harmful, and they are even more detrimental for pediatric patients. This study explored the relationship between nursing experience, education, the frequency and severity of reported pediatric medication administration errors (PMAEs). The data for this study were collected from a larger pan Canadian study. A survey tool was developed to collect self-reported data from nurses. In addition to descriptive statistics, a Poisson regression or a multiple linear regression was completed to address the research questions, and a Boneferrai correction was conducted to adjust for the small sample size. Results demonstrated that on units with more nurses with a higher level of current experience, more PMAEs were reported (p=.001), however; the PMAEs reported by these nurses were not as severe (p=.003). Implications to advance both safe medication delivery in the pediatric setting and safe culture of reporting for both actual and potential errors are identified.

  9. Conference Report: Power and Energy Society Annual Conference

    NASA Astrophysics Data System (ADS)

    Yorino, Naoto; Mori, Hiroyuki

    The 19th Power & Energy Society Annual Conference was held on September 24-26, 2008 at Hiroshima University. The total number of technical papers was 415 and 53 sessions (52 oral sessions and 1 poster session) were organized. A panel discussion, a special lecture, technical exhibitions and technical tours were also organized. All events were very well attended and the final enrollment attained to 954 registrations. The conference has been successfully closed by the great contribution of all participants. In this article, the outline of the conference is reported.

  10. Austin Children`s Museum ``Go Power`` project. Final report

    SciTech Connect

    Not Available

    1993-10-01

    Go Power, was conceived as an interactive exhibit and related set of activities designed to promote in children and families an understanding and appreciation of energy concepts. Planned in 1990, the project culminated its first phase of activities with colorful, interactive exhibit about the pathways and transformations of energy, on display at the Austin Children`s Museum between February 5th and June 6th, 1993. The project was supported by the US Department of Energy, the National Science Foundation, the Lower Colorado River Authority and various local foundations and businesses. This report describes the process, product and outcomes of this project.

  11. Folsom-Nimbus 115 kV transmission line replacement for Western Area Power Administration: Environmental assessment

    SciTech Connect

    Not Available

    1980-07-01

    The Western Area Power Administration (Western) proposes to replace the existing Folsom-Nimbus 115 kV electrical transmission line along the American River between Folsom Dam and Nimbus Dam in Sacramento County, California. The need to replace the line is attributed to the deterioration of the existing wood pole structures by the acorn woodpecker; thus resulting in increased maintenance and hazard potential. The need for the replacement of the Folsom-Nimbus transmission line has resulted in the evaluation by Western of various routing alternatives. These alternatives were evaluated in terms of design, economic and environmental considerations. 60 refs., 19 figs., 4 tabs.

  12. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    SciTech Connect

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  13. Rehabilitation Services Administration Annual Report, Fiscal Year 2004: Report on Federal Activities under the "Rehabilitation Act"

    ERIC Educational Resources Information Center

    US Department of Education, 2007

    2007-01-01

    The "Rehabilitation Act of 1973," as amended (the act), provides the legislative basis for programs and activities that assist individuals with disabilities in the pursuit of gainful employment, independence, self-sufficiency and full integration into community life. This report is intended to provide a description of accomplishments and…

  14. Self-reported use of mental health services versus administrative records: care to recall?

    PubMed

    Rhodes, Anne E; Fung, Kinwah

    2004-01-01

    Estimates of the level of unmet need for mental health treatment often rely on self-reported use of mental health services. However, depressed persons may over-report their use in relation to administrative records if they are highly distressed. This study seeks to replicate and explicate the finding that persons at a high level of distress report more mental health service use than recorded in their healthcare records. The study sample, N = 36,892, 12 years and older, was drawn from the 1996/97 Ontario portion of the Canadian National Population Health Survey. Respondents were individually linked to their administrative mental healthcare records 12 months backward in time. Of these, 96.5% agreed to the link and 23,063 (62.5%) were linked. Almost two-thirds of those who were depressed in the past year were currently at a high level of distress. Differential reporting of use for highly distressed persons in excess of 100% remained in the use of different types of physician providers after adjustments for other potential determinants of use. Telescoping was also not an explanation. The patterns of differential reporting between groups expected to diverge and converge in their recall ability were consistent with a recall bias. As this study was not able to rule out a recall bias, it further accentuates concerns about the impact of bias in the measurement of mental health-service use and inferences made concerning the determinants of use.

  15. National Nuclear Security Administration Nonproliferation Graduate Fellowship Program Annual Report in Brief: October 2007 - May 2008

    SciTech Connect

    Berkman, Clarissa O.; Fankhauser, Jana G.; Sandusky, Jessica A.

    2009-05-01

    This abbreviated Annual Report covers program activities of the National Nuclear Security Administration (NNSA) Nonproliferation Graduate Fellowship Program (NGFP) from October 2007 through May 2008--the timeframe between the last Annual Report (which covered activities through September 2007) and the next report (which will begin with June 2008 activities). In that timeframe, the NGFP continued building a solid foundation as the program began reaping the benefits of recently implemented changes. This report is organized by Fellowship class and the pertinent program activities for each, including: October 2007 Recruiting events and final applications (Class of 2008) Winter 2007 Selection and hiring (Class of 2008) Spring 2008 Career development roundtables (Class of 2007) Orientation planning (Class of 2008) Recruitment planning and university outreach (Class of 2009) May 2008 Closing ceremony (Class of 2007)

  16. Annual Report of the National Advisory Committee for Aeronautics (1st). [Administrative Report Including Technical Reports Nos. 1 to 7

    NASA Technical Reports Server (NTRS)

    1916-01-01

    Report includes the National Advisory Committee for Aeronautics letter of submittal to the President, Congressional report, summaries of the committee's activities and research accomplished, expenditures, problems, recommendations, and a compilation of technical reports produced.

  17. Tracy Power Station -- Unit No. 4, Pinon Pine Power Project Public Design Report

    SciTech Connect

    1994-12-01

    This Public Design Report describes the Pinon Pine Project which will be located at the Sierra Pacific Power Company`s (SPPCO) Tracy Station near Reno, Nevada. The integrated gasification combined-cycle (IGCC) plant is designed to process 880 tones per day (TPD) of bituminous coal producing approximately 107 gross megawatts of electric power (MWe). This project is receiving cost-sharing from the US Department of Energy (DOE) in accordance with DOE Cooperative Agreement DE-FC2192MC29309. The plant incorporates the Kellogg-Rust-Westinghouse (KRW) fluidized bed gasification technology which produces a low-Btu gas which is used as fuel in a combined cycle power plant which has been modified to accommodate the fuel gas produced by an air-blown gasifier. The gasification system also includes hot gas removal of particulates and sulfur compounds from the fuel gas resulting in a plant with exceptionally low atmospheric emissions. Desulfurization is accomplished by a combination of limestone injection into the KRW fluidized bed gasifier and by a transport reactor system. Particulate removal is accomplished by high efficiency cyclones and a barrier filter. The Pinon Pine Project Schedule is divided into three phases. Phase I includes permitting and preliminary design. Phase II, which overlaps Phase I, covers detailed design, procurement, and construction. Phase III will cover the initial operation and demonstration portion of the project.

  18. Annual report of the National Advisory Committee for Aeronautics (40th). administrative report including Technical Report nos. 1158-1209

    NASA Technical Reports Server (NTRS)

    1956-01-01

    Report includes the National Advisory Committee for Aeronautics letter of submittal to the President, summaries of the committee's activities and research accomplished, bibliographies, and financial report.

  19. Annual report of the National Advisory Committee for Aeronautics (44th). administrative report including Technical Report nos. 1342 to 1366

    NASA Technical Reports Server (NTRS)

    1959-01-01

    Report includes the National Advisory Committee for Aeronautics letter of submittal to the President, summaries of the committee's activities and research accomplished, bibliographies, and financial report.

  20. Annual report of the National Advisory Committee for Aeronautics (34th). administrative report including Technical Report nos. 892 to 921

    NASA Technical Reports Server (NTRS)

    1951-01-01

    Report includes the National Advisory Committee for Aeronautics letter of submittal to the President, summaries of the committee's activities and research accomplished, bibliographies, and financial report.

  1. Annual report of the National Advisory Committee for Aeronautics (37th). administrative report including Technical Report nos. 1003 to 1031

    NASA Technical Reports Server (NTRS)

    1952-01-01

    Report includes the National Advisory Committee for Aeronautics letter of submittal to the President, summaries of the committee's activities and research accomplished, bibliographies, and financial report.

  2. Annual report of the National Advisory Committee for Aeronautics (42nd). administrative report including Technical Report nos. 1254 to 1295

    NASA Technical Reports Server (NTRS)

    1957-01-01

    Report includes the National Advisory Committee for Aeronautics letter of submittal to the President, summaries of the committee's activities and research accomplished, bibliographies, and financial report.

  3. Annual report of the National Advisory Committee for Aeronautics (35th). administrative report including Technical Report nos. 922 to 950

    NASA Technical Reports Server (NTRS)

    1951-01-01

    Report includes the National Advisory Committee for Aeronautics letter of submittal to the President, summaries of the committee's activities and research accomplished, bibliographies, and financial report.

  4. Annual report of the National Advisory Committee for Aeronautics (38th). administrative report including Technical Report nos. 1059 to 1110

    NASA Technical Reports Server (NTRS)

    1954-01-01

    Report includes the National Advisory Committee for Aeronautics letter of submittal to the President, summaries of the committee's activities and research accomplished, bibliographies, and financial report.

  5. Annual report of the National Advisory Committee for Aeronautics (36th). administrative report including Technical Report nos. 951 to 1002

    NASA Technical Reports Server (NTRS)

    1951-01-01

    Report includes the National Advisory Committee for Aeronautics letter of submittal to the President, summaries of the committee's activities and research accomplished, bibliographies, and financial report.

  6. Annual report of the National Advisory Committee for Aeronautics (41st). administrative report including Technical Report nos. 1210 to 1253

    NASA Technical Reports Server (NTRS)

    1957-01-01

    Report includes the National Advisory Committee for Aeronautics letter of submittal to the President, summaries of the committee's activities and research accomplished, bibliographies, and financial report.

  7. Annual report of the National Advisory Committee for Aeronautics (29th) : administrative report including Technical Report nos. 752 to 773

    NASA Technical Reports Server (NTRS)

    1948-01-01

    Report includes the National Advisory Committee for Aeronautics letter of submittal to the President, summaries of the committee's activities and research accomplished, bibliographies, and financial report.

  8. Shutdown and low-power operation at commercial nuclear power plants in the United States. Final report

    SciTech Connect

    Not Available

    1993-09-01

    The report contains the results of the NRC Staff`s evaluation of shutdown and low-power operations at US commercial nuclear power plants. The report describes studies conducted by the staff in the following areas: Operating experience related to shutdown and low-power operations, probabilistic risk assessment of shutdown and low-power conditions and utility programs for planning and conducting activities during periods the plant is shut down. The report also documents evaluations of a number of technical issues regarding shutdown and low-power operations performed by the staff, including the principal findings and conclusions. Potential new regulatory requirements are discussed, as well as potential changes in NRC programs. A draft report was issued for comment in February 1992. This report is the final version and includes the responses to the comments along with the staff regulatory analysis of potential new requirements.

  9. Improvement in Hemodynamics After Methylene Blue Administration in Drug-Induced Vasodilatory Shock: A Case Report.

    PubMed

    Laes, JoAn R; Williams, David M; Cole, Jon B

    2015-12-01

    The purpose of this study is to describe a case where methylene blue improved hemodynamics in a poisoned patient. This is a single case report where a poisoned patient developed vasodilatory shock following ingestion of atenolol, amlodipine, and valsartan. Shock persisted after multiple therapies including vasopressors, high-dose insulin, hemodialysis, and 20% intravenous fat emulsion. Methylene blue (2 mg/kg IV over 30 min) was administered in the ICU with temporal improvement as measured by pulmonary artery catheter hemodynamic data pre- and post-methylene blue administration. Within 1 h of methylene blue administration, systemic vascular resistance improved (240 dyn s/cm5 increased to 1204 dyn s/cm5), and vasopressor requirements decreased with maintenance of mean arterial pressure 60 mmHg. Methylene blue may improve hemodynamics in drug-induced vasodilatory shock and should be considered in critically ill patients poisoned with vasodilatory medications refractory to standard therapies.

  10. Transition report, United States Department of Energy: A report to the President-Elect. Volume 2

    SciTech Connect

    Not Available

    1988-11-01

    This report is a description of the Department of Energy transition issues. The topics of the report include: Congressional, Intergovernmental and Public Affairs; Conservation and Renewable Energy; Defense Programs; New Production Reactors; Economic Regulatory Administration; Energy Information Administration; energy research; environment, safety and health; fossil energy; General Counsel; hearings and appeals, Inspector General, international affairs and energy emergencies; management and administration, minority economic impact; nuclear energy; policy, planning and analysis, radioactive waste management; and power marketing administrations: Bonneville Power Administration, Western Area Power Administration, Alaska Power Administration, Southeastern Power Administration, and Southwestern Power Administration.

  11. How Women Administrators Are Perceived by Others: A Case Study Examining the Relationship between Leadership Temperament, Use of Power, and Success.

    ERIC Educational Resources Information Center

    Duncan, P. Kay; Skarstad, Kirsten

    Research indicates that others' perceptions of the success of a woman administrator are related to whether the woman fits into the range of expected behavior for women in our society, including the way in which she wields power. To explore this phenomenon, this study examined the leadership temperament of the woman administrator and how it…

  12. Relationship between tort claims and patient incident reports in the Veterans Health Administration

    PubMed Central

    Schmidek, J; Weeks, W

    2005-01-01

    Objective: The Veterans Health Administration's patient incident reporting system was established to obtain comprehensive data on adverse events that affect patients and to act as a harbinger for risk management. It maintains a dataset of tort claims that are made against Veterans Administration's employees acting within the scope of employment. In an effort to understand the thoroughness of reporting, we examined the relationship between tort claims and patient incident reports (PIRs). Methods: Using social security and record numbers, we matched 8260 tort claims and 32 207 PIRs from fiscal years 1993–2000. Tort claims and PIRs were considered to be related if the recorded dates of incident were within 1 month of each other. Descriptive statistics, odds ratios, and two sample t tests with unequal variances were used to determine the relationship between PIRs and tort claims. Results: 4.15% of claims had a related PIR. Claim payment (either settlement or judgment for plaintiff) was more likely when associated with a PIR (OR 3.62; 95% CI 2.87 to 4.60). Payment was most likely for medication errors (OR 8.37; 95% CI 2.05 to 73.25) and least likely for suicides (OR 0.25; 95% CI 0.11 to 0.55). Conclusions: Although few tort claims had a related PIR, if a PIR was present the tort claim was more likely to result in a payment; moreover, the payment was likely to be higher. Underreporting of patient incidents that developed into tort claims was evident. Our findings suggest that, in the Veterans Health Administration, there is a higher propensity to both report and settle PIRs with bad outcomes. PMID:15805457

  13. Relationship between tort claims and patient incident reports in the Veterans Health Administration.

    PubMed

    Schmidek, J M; Weeks, W B

    2005-04-01

    The Veterans Health Administration's patient incident reporting system was established to obtain comprehensive data on adverse events that affect patients and to act as a harbinger for risk management. It maintains a dataset of tort claims that are made against Veterans Administration's employees acting within the scope of employment. In an effort to understand the thoroughness of reporting, we examined the relationship between tort claims and patient incident reports (PIRs). Using social security and record numbers, we matched 8260 tort claims and 32 207 PIRs from fiscal years 1993-2000. Tort claims and PIRs were considered to be related if the recorded dates of incident were within 1 month of each other. Descriptive statistics, odds ratios, and two sample t tests with unequal variances were used to determine the relationship between PIRs and tort claims. 4.15% of claims had a related PIR. Claim payment (either settlement or judgment for plaintiff) was more likely when associated with a PIR (OR 3.62; 95% CI 2.87 to 4.60). Payment was most likely for medication errors (OR 8.37; 95% CI 2.05 to 73.25) and least likely for suicides (OR 0.25; 95% CI 0.11 to 0.55). Although few tort claims had a related PIR, if a PIR was present the tort claim was more likely to result in a payment; moreover, the payment was likely to be higher. Underreporting of patient incidents that developed into tort claims was evident. Our findings suggest that, in the Veterans Health Administration, there is a higher propensity to both report and settle PIRs with bad outcomes.

  14. Adjustable silicone gastric banding adverse events reported to the Food and Drug Administration.

    PubMed

    Brown, S Lori; Reid, Marie H; Duggirala, Hesha Jani

    2003-01-01

    A silicone adjustable gastric banding system was approved by the Food and Drug Administration (FDA) in June, 2001. The purpose of this report is to review and characterize the reports on silicone adjustable gastric banding systems received by the FDA through August 8, 2002. We also review medical literature on adverse events with silicone adjustable gastric banding systems. Manufacturers of regulated medical devices, such as adjustable silicone gastric bands, are required to report adverse events, including deaths and serious injuries, to the FDA. We reviewed all such reports received by the FDA through August 8, 2002, for adjustable silicone gastric bands and summarize the data by type of adverse event, reported device problems, and reported patient problems. The FDA received 556 reports of adverse events related to the use of adjustable silicone gastric bands. Two of these reports were for deaths, one during surgery and the other as a result of an erosion of the gastric band into the stomach 9 weeks after implantation. Forty-four reports were for injuries including band erosions, slippage, and infection. The most common type of report (499) was for device malfunction, and of these, 485 (97.2%) described a leak at or near the port. Of the 485 leaks reported as malfunctions, 99.4% were treated surgically. The majority of reports were related to disconnection, breakage, and leakage at or near the access port. Physicians and potential patients should be aware of these problems and recognize the possibility that additional surgery(ies) may be required for leaking access port/connections. The loose connection may cause pain and the device no longer performs as intended when there is a leak.

  15. Validation of the Addiction Severity Index (ASI) for internet and automated telephone self-report administration.

    PubMed

    Brodey, Benjamin B; Rosen, Craig S; Brodey, Inger S; Sheetz, Breanne M; Steinfeld, Robert R; Gastfriend, David R

    2004-06-01

    This study assesses the convergent validity of Internet (Net) and interactive voice response (IVR) automated telephone self-report versions of the Addiction Severity Index (ASI) relative to the established, clinician-administered (CA) ASI. Eighty-eight subjects were recruited from an addiction treatment program to complete three ASI assessments. The mean correlation between composite scores obtained by Net and IVR and those obtained via clinician interview was.91 (range.81-.95). For History items, the mean correlation was.77 (range.14-1.00) and the mean kappa coefficient was.75 (range.46-1.00). The results demonstrated the validity of these self-report Net and IVR versions of the ASI. Self-report Net and IVR were rated as "very satisfactory" or "extremely satisfactory" by a majority of respondents for ease of use. Automation can reduce the labor costs associated with ASI administration and may facilitate longitudinal tracking of subjects from home.

  16. Title I: Although Definitions of Administrative Expenditures Vary, Almost All School Districts Studied Spent Less Than 10 Percent on Administration. Report to Congressional Committees.

    ERIC Educational Resources Information Center

    Shaul, Marnie S.

    As mandated by the No Child Left Behind Act of 2001, the Government Accounting Office was charged with examining how school districts defined and spent Title I funds on administrative activities, and with reviewing Title I expenditures in at least six school districts. This document reports on how five studies defined Title I administrative…

  17. Power systems development facility. Quarterly report, January 1995--March 1995

    SciTech Connect

    1995-05-01

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: (1) Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. (2) Hot Gas Cleanup Units to mate to all gas streams. (3) Combustion Gas Turbine. (4) Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility and integrating the particulate control devices (PCDs) into structural and process designs.

  18. Power Systems Development Facility. Quarterly report, January--March 1996

    SciTech Connect

    1996-05-01

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particular control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the Foster Wheeler portion of the facility towards completion and integrating the balance-of-plant processes and particulate control devices (PCDs) into the structural and process designs. Substantial progress in construction activities was achieved during the quarter.

  19. Technology verification phase. Dynamic isotope power system. Final report

    SciTech Connect

    Halsey, D.G.

    1982-03-10

    The Phase I requirements of the Kilowatt Isotope Power System (KIPS) program were to make a detailed Flight System Conceptual Design (FSCD) for an isotope fueled organic Rankine cycle power system and to build and test a Ground Demonstration System (GDS) which simulated as closely as possible the operational characteristics of the FSCD. The activities and results of Phase II, the Technology Verification Phase, of the program are reported. The objectives of this phase were to increase system efficiency to 18.1% by component development, to demonstrate system reliability by a 5000 h endurance test and to update the flight system design. During Phase II, system performance was improved from 15.1% to 16.6%, an endurance test of 2000 h was performed while the flight design analysis was limited to a study of the General Purpose Heat Source, a study of the regenerator manufacturing technique and analysis of the hardness of the system to a laser threat. It was concluded from these tests that the GDS is basically prototypic of a flight design; all components necessary for satisfactory operation were demonstrated successfully at the system level; over 11,000 total h of operation without any component failure attested to the inherent reliability of this type of system; and some further development is required, specifically in the area of performance. (LCL)

  20. A Quantitative Assessment of Utility Reporting Practices for Reporting Electric Power Distribution Events

    SciTech Connect

    Hamachi La Commare, Kristina

    2011-11-11

    Metrics for reliability, such as the frequency and duration of power interruptions, have been reported by electric utilities for many years. This study examines current utility practices for collecting and reporting electricity reliability information and discusses challenges that arise in assessing reliability because of differences among these practices. The study is based on reliability information for year 2006 reported by 123 utilities in 37 states representing over 60percent of total U.S. electricity sales. We quantify the effects that inconsistencies among current utility reporting practices have on comparisons of System Average Interruption Duration Index (SAIDI) and System Average Interruption Frequency Index (SAIFI) reported by utilities. We recommend immediate adoption of IEEE Std. 1366-2003 as a consistent method for measuring and reporting reliability statistics.

  1. 78 FR 4477 - Review of Safety Analysis Reports for Nuclear Power Plants, Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... COMMISSION Review of Safety Analysis Reports for Nuclear Power Plants, Introduction AGENCY: Nuclear... subsection to NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power..., Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:...

  2. 78 FR 37324 - Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... COMMISSION 10 CFR Parts 51 and 54 RIN 3150-AI42 Preparation of Environmental Reports for Nuclear Power Plant..., Supplement 1 (RG 4.2S1), ``Preparation of Environmental Reports for Nuclear Power Plant License Renewal... reports that are submitted with the application for the renewal of a nuclear power plant operating...

  3. Total colectomy for colon perforation after kayexalate administration: a case report and literature review of a rare complication

    PubMed Central

    Dunlap, Robert Hunt; Martinez, Ryan

    2016-01-01

    Kayexalate is an ion exchange resin that is commonly used to acutely treat patients with hyperkalemia. Bowel ulceration and necrosis is a rare and uncommonly recognized complication of kayexalate administration. More often, concomitant administration with sorbitol is reported to damage the bowel; however, there are reports of kayexalate administration causing bowel necrosis without sorbitol. We present a case of a critically ill patient who underwent total colectomy for colonic necrosis secondary to oral kayexalate administration that was not recognized until late in the pathologic process. We also review the literature to further investigate this progression. PMID:27765805

  4. Evaluating and Reporting Statistical Power in Counseling Research

    ERIC Educational Resources Information Center

    Balkin, Richard S.; Sheperis, Carl J.

    2011-01-01

    Despite recommendations from the "Publication Manual of the American Psychological Association" (6th ed.) to include information on statistical power when publishing quantitative results, authors seldom include analysis or discussion of statistical power. The rationale for discussing statistical power is addressed, approaches to using "G*Power" to…

  5. Evaluating and Reporting Statistical Power in Counseling Research

    ERIC Educational Resources Information Center

    Balkin, Richard S.; Sheperis, Carl J.

    2011-01-01

    Despite recommendations from the "Publication Manual of the American Psychological Association" (6th ed.) to include information on statistical power when publishing quantitative results, authors seldom include analysis or discussion of statistical power. The rationale for discussing statistical power is addressed, approaches to using "G*Power" to…

  6. Power plant system assessment. Final report. SP-100 Program

    SciTech Connect

    Anderson, R.V.; Atkins, D.F.; Bost, D.S.; Berman, B.; Clinger, D.A.; Determan, W.R.; Drucker, G.S.; Glasgow, L.E.; Hartung, J.A.; Harty, R.B.

    1983-10-31

    The purpose of this assessment was to provide system-level insights into 100-kWe-class space reactor electric systems. Using these insights, Rockwell was to select and perform conceptual design studies on a ''most attractive'' system that met the preliminary design goals and requirements of the SP-100 Program. About 4 of the 6 months were used in the selection process. The remaining 2 months were used for the system conceptual design studies. Rockwell completed these studies at the end of FY 1983. This report summarizes the results of the power plant system assessment and describes our choice for the most attractive system - the Rockwell SR-100G System (Space Reactor, 100 kWe, Growth) - a lithium-cooled UN-fueled fast reactor/Brayton turboelectric converter system.

  7. Knolls Atomic Power Laboratory environmental monitoring report, calendar year 1999

    SciTech Connect

    2000-12-01

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the three KAPL Sites [Knolls Site, Niskayuna, New York; Kesselring Site, West Milton, New York; S1C Site, Windsor, Connecticut] during calendar year 1999 resulted in no significant release of hazardous substances or radioactivity to the environment. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each Site and at off-site background locations.

  8. HEMP interaction with an electric power distribution circuit. Final report

    SciTech Connect

    Zaininger, H.W.; Jaszewski, G.M.

    1985-08-01

    A high altitude nuclear burst, detonated at a height of 50 km or more, causes two types of electromagnetic pulses, high altitude EMP (HEMP) and magnetohydrodynamic EMP, which will interact with electric power systems. Previous work indicated that millions of miles of electric distribution systems in the United States may be especially vulnerable to HEMP incident simultaneously throughout large portions of the United States. Purpose of this work was to perform an initial assessment of HEMP induced surges on a simplified electric distribution system. This report presents the assumptions, methodology, and resulting induced transient voltages and currents at various points in the distribution circuit in the microsecond timeframe, considering the impacts of HEMP incident simultaneously throughout the distribution system for a range of parametric conditions. Results of this work suggest that EMP could induce voltage transients that far exceed the basic insulation level (BIL) of distribution systems and that a more detailed analysis is warranted.

  9. Rocketdyne Propulsion & Power DOE Operations Annual Site Environmental Report 1996

    SciTech Connect

    Tuttle, R. J.

    1997-11-10

    This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by Rocketdyne Propulsion & Power of Boeing North American. Inc. (formerly Rockwell International Corporation). These are identified as the Santa Susana Field Laboratory (SSFL and the De Soto site. The sites have been used for manufacturing; R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto site essentially comprises office space and light industry with no remaining radiological operations, and has little potential impact on the environment. The SSFL site, because of its large size (2.668 acres), warrants comprehensive monitoring to ensure protection of the environment.

  10. The performance of administrative and self-reported measures for risk adjustment of Veterans Affairs expenditures.

    PubMed

    Maciejewski, Matthew L; Liu, Chuan-Fen; Derleth, Ann; McDonell, Mary; Anderson, Steve; Fihn, Stephan D

    2005-06-01

    To evaluate the performance of different prospective risk adjustment models of outpatient, inpatient, and total expenditures of veterans who regularly use Veterans Affairs (VA) primary care. We utilized administrative, survey and expenditure data on 14,449 VA patients enrolled in a randomized trial that gave providers regular patient health assessments. This cohort study compared five administrative data-based, two self-report risk adjusters, and base year expenditures in prospective models. VA outpatient care and nonacute inpatient care expenditures were based on unit expenditures and utilization, while VA expenditures for acute inpatient care were calculated from a Medicare-based inpatient cost function. Risk adjusters for this sample were constructed from diagnosis, medication and self-report data collected during a clinical trial. Model performance was compared using adjusted R2 and predictive ratios. In all expenditure models, administrative-based measures performed better than self-reported measures, which performed better than age and gender. The Diagnosis Cost Groups (DCG) model explained total expenditure variation (R2=7.2 percent) better than other models. Prior outpatient expenditures predicted outpatient expenditures best by far (R2=42 percent). Models with multiple measures improved overall prediction, reduced over-prediction of low expenditure quintiles, and reduced under-prediction in the highest quintile of expenditures. Prediction of VA total expenditures was poor because expenditure variation reflected utilization variation, but not patient severity. Base year expenditures were the best predictor of outpatient expenditures and nearly the best for total expenditures. Models that combined two or more risk adjusters predicted expenditures better than single-measure models, but are more difficult and expensive to apply.

  11. Report of the Power Sub systems Panel. [spacecraft instrumentation technology

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Problems in spacecraft power system design, testing, integration, and operation are identified and solutions are defined. The specific technology development problems discussed include substorm and plasma design data, modeling of the power subsystem and components, power system monitoring and degraded system management, rotary joints for transmission of power and signals, nickel cadmium battery manufacturing and application, on-array power management, high voltage technology, and solar arrays.

  12. Progress in developing tidal electric power plants reported

    NASA Astrophysics Data System (ADS)

    Blokhnin, A.

    1984-12-01

    The natural energy potential of tides on the shores of the U.S.S.R. is equal to about a third of the world's total. The Achilles heel of tidal power plants is their pulsating operation. One solution to this problem was to build a hydroelectric power plant for use in tandem with the tidal power plant. During lulls in the tidal plant, the hydraulic power plant switches on at full power. Possible sites for dual plants were discussed.

  13. Report of Apollo 204 Review Board to the Administrator, National Aeronautics and Space Administration . Appendix F ; Schedule of Physical Evidence

    NASA Technical Reports Server (NTRS)

    1967-01-01

    Immediately following the Apollo 204 accident of January 27, 1961. all associated equipment and material were impounded. Release of this equipment and material for normal use was under the close control of the Apollo 204 Review Board. Apollo Review Board Administrative Procedure No. 11, February 11, 1961, established the Apollo 204 Review Board Material Release Record (MRR). This MRR was the official form used to release material from full impoundment and was valid only after being approved by the Board and signed by a Member. The form was used as the authority to place any impounded item into one of the three Categories defined in Administrative Procedure No. 11. This appendix contains all of the authorized MRR's. Each item submitted on an MRR was given a control number; a description, including the part number and serial number; the relevance and location to the accident; any constraints before release; and the control category. The categories placed on the equipment were as follows: Category A - Items which may have a significant influence or bearing on the results or findings of the Apollo 204 Review Board; Category B - All material other than Category A which is considered relevant to the Apollo 204 Review Board investigation; Category C - Material released from Board jurisdiction. Several classes of equipment were released by special Board action prior to the establishment of the MRR system. The operating procedure for release of these classes is Enclosure F-l to this appendix.

  14. Reporter gene expression in dendritic cells after gene gun administration of plasmid DNA.

    PubMed

    Watkins, Craig; Hopkins, John; Harkiss, Gordon

    2005-07-21

    Dendritic cells (DC) play an integral role in plasmid DNA vaccination. However, the interaction between plasmid DNA and DC in vivo is incompletely understood. In this report, we utilise the sheep pseudoafferent cannulation model to examine the interaction between plasmid DNA encoding enhanced green fluorescent protein (pEGFP) and afferent lymph DC (ALDC) following gene gun administration. The results show that peaks of fluorescent ALDC tended to appear around days 1-4 and 9-13, then erratically thereafter for up to 2 months. Phenotypic analysis showed that EGFP+ ALDC expressed MHC class II, WC6, CD1b, and SIRPalpha markers. Plasmid, detected by PCR, was found in lymph cells and cell-free plasma on a daily basis, and was present variably for up to 2 months. Plasmid was also detected in purified CD1b+ ALDC, but the presence of plasmid did not correlate with EGFP expression by ALDC. Free EGFP in afferent lymph plasma was detectable by luminometry only after three administrations of the plasmid. The results show that gene gun administered pEGFP persisted for extended periods after a single administration, leeching out of skin on a daily basis. The plasmid was associated with both the cellular and fluid components of afferent lymph. EGFP protein appeared in afferent lymph in a pulsatile manner, but associated only with ALDC.

  15. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    SciTech Connect

    N /A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides

  16. Bonneville Power Administration Transmission System Vegetation Management Program Draft Environmental Impact Statement

    SciTech Connect

    N /A

    1999-08-20

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from the electric facilities; (2) increase the program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This DEIS establishes Planning Steps for managing vegetation for specific projects (to be tiered to this EIS). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, they consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would factor a management approach that

  17. Bonneville Power Administration Fish & Wildlife Implementation Plan Final Environmental Impact Statement

    SciTech Connect

    N /A

    2003-05-09

    The Pacific Northwest has long prided itself on its bountiful and diverse natural resources--its forests and grasslands, minerals and rivers, fish and wildlife. The Region has also relied on these natural resources to serve multiple, and sometimes conflicting, uses. The independent demands of the whole spectrum of human uses (such as irrigation, municipal water supplies, grazing, fishing and hunting, electric power production, recreation, timber harvest, and transportation) have placed increasing stress on the natural resources of the Columbia River Basin. One consequence is that, over the last decade, the number of fish and wildlife species listed as endangered or threatened under the Endangered Species Act (ESA) has dramatically increased. The Region has sought to stem and even reverse the species decline. Unfortunately, after a decade of good intentions, there has been less progress than is necessary to reverse this trend. Here are the most important reasons: (1) Different groups have different value judgments about priorities, leading to different (and often conflicting) ideas about what recovery and mitigation efforts should be. (2) There is no clear and agreed-upon scientific answer to the problem. (3) Conflicting directives and jurisdictions of regional authorities have meant that funds dedicated to fish and wildlife mitigation and recovery efforts have often been used less efficiently and effectively than they otherwise could have been. Recently, regional entities have taken steps to work together to develop a comprehensive and coordinated planning approach for species recovery and mitigation. For example, over the past several years the Council's Columbia River Basin Fish and Wildlife Program, the Recommendations for the Protection and Restoration of Fish In The Columbia River Basin by the Governors of the four Northwestern States, and the Federal Caucus' Conservation of Columbia Basin Fish: Final Basinwide Salmon Recovery Strategy (Basinwide Strategy

  18. Transnational exchange of scientific data: The ``Bits of Power'' report

    NASA Astrophysics Data System (ADS)

    Berry, R. Stephen

    1998-07-01

    In 1994, the U.S. National Committee for the Committee on Data for Science and Technology (CODATA), organized under the Commission on Physical Sciences, Mathematics and Applications of the National Research Council established the Committee on Issues in the Transborder Flow of Scientific Data. The purpose of this Committee was to examine the current state of global access to scientific data, to identify strengths, problems and challenges confronting scientists now, or likely to arise in the next few years, and to make recommendations on building the strengths and ameliorating or avoiding the problems. The Committee's report appeared as the book Bits of Power: Issues in Global Access to Scientific Data (National Academy Press, Washington, D.C., 1997). This presentation is a brief summary of that report, particularly as it pertains to atomic and molecular data. The context is necessarily the evolution toward increasing electronic acquisition, archiving and distribution of scientific data. Thus the central issues were divided into the technological infrastructure, the issues for the sciences and scientists in the various disciplines, the economic aspects and the legal issues. For purposes of this study, the sciences fell naturally into four groups: the laboratory physical sciences, the biological sciences, the earth sciences and the astronomical and planetary sciences. Some of the substantive scientific aspects are specific to particular groups of sciences, but the matters of infrastructure, economic questions and legal issues apply, for the most part, to all the sciences.

  19. Office of Inspector General report on audit of Southwestern Federal Power System combined financial statements and supplemental schedules (with independent auditors` reports thereon) for the years ended September 30, 1997 and 1996

    SciTech Connect

    1998-10-06

    Southwestern Federal Power System (SWFPS) encompasses the operation of 24 hydroelectric power plants by the US Army Corps of Engineers and the marketing of power and energy from those plants by the Southwestern Power Administration (Southwestern) of the US Department of Energy. This report presents the results of the independent certified public accountants` audit of the SWFPS`s combined power system statements of assets, Federal investments and liabilities, and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows.

  20. Intravenous administration and abuse of bupropion: a case report and a review of the literature.

    PubMed

    Oppek, Kirsten; Koller, Gabriele; Zwergal, Andreas; Pogarell, Oliver

    2014-01-01

    Bupropion is an effective and well-tolerated second-generation antidepressant generally assumed to be without abuse potential. In the past years, several case reports about the recreational use of bupropion, mainly via nasal insufflation, have been published. Last year, a first case of intravenous bupropion dependence was reported. We present another case of intravenous administration of and dependence on bupropion in a 29-year-old woman with a history of polysubstance dependence, who consumed an extremely high daily dose of about 2400 mg of bupropion together with a daily oral dose of 2400 to 3600 mg of pregabalin. The possible impact of bupropion on subjects with a history of polysubstance dependence is discussed; physicians should be careful when prescribing bupropion in these cases.

  1. Self-reported performance improvement strategies of highly successful Veterans Health Administration facilities.

    PubMed

    Craig, Thomas J; Perlin, Jonathan B; Fleming, Barbara B

    2007-01-01

    The Veterans Health Administration (VHA) has achieved considerable success in improving health care through the use of clinical performance measures. This report examines the self-reported strategies used by the most successful facilities in the VHA system. For fiscal year 2002, facilities that scored the highest on any of 24 clinical performance measures were queried as to which strategies they used to achieve their level of performance. The most commonly cited strategies across all performance categories were organizational change (55.6%), clinical reminders (41.4%), audit and feedback to providers (39.6%), and staff education (32.5%). Certain strategies were more likely to be cited for 1 or more specific performance categories (eg, clinical reminders for immunization [61.1%], screening [60.6%]). These findings suggest that successful facilities are generally using evidence-based strategies to achieve high clinical performance. However, some evidence-based implementation strategies were rarely cited (eg, use of clinical champions).

  2. Recommendations for the standardisation of oxytocin nasal administration and guidelines for its reporting in human research.

    PubMed

    Guastella, Adam J; Hickie, Ian B; McGuinness, Margaret M; Otis, Melissa; Woods, Elizabeth A; Disinger, Hannah M; Chan, Hak-Kim; Chen, Timothy F; Banati, Richard B

    2013-05-01

    A series of studies have reported on the salubrious effects of oxytocin nasal spray on social cognition and behavior in humans, across physiology (e.g., eye gaze, heart rate variability), social cognition (e.g., attention, memory, and appraisal), and behavior (e.g., trust, generosity). Findings suggest the potential of oxytocin nasal spray as a treatment for various psychopathologies, including autism and schizophrenia. There are, however, increasing reports of variability of response to oxytocin nasal spray between experiments and individuals. In this review, we provide a summary of factors that influence transmucosal nasal drug delivery, deposition, and their impact on bioavailability. These include variations in anatomy and resultant airflow dynamic, vascularisation, status of blood vessels, mode of spray application, gallenic formulation (including presence of uptake enhancers, control release formulation), and amount and method of administration. These key variables are generally poorly described and controlled in scientific reports, in spite of their potential to alter the course of treatment outcome studies. Based on this review, it should be of no surprise that differences emerge across individuals and experiments when nasal drug delivery methods are employed. We present recommendations for researchers to use when developing and administering the spray, and guidelines for reporting on peptide nasal spray studies in humans. We hope that these recommendations assist in establishing a scientific standard that can improve the rigor and subsequent reliability of reported effects of oxytocin nasal spray in humans.

  3. Power Systems Development Facility. Quarterly report, July--September 1995

    SciTech Connect

    1995-11-01

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a fimction of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and hot gas cleanup units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility towards completion and integrating the balance-of-plant processes and particulate control devices (PCDS) into the structural and process designs. Substantial progress in construction activities was achieved during the quarter. Delivery and construction of the process structural steel is nearing completion. Nearly all equipment are set in its place and the FW equipment and the PCDs are being set in the structure.

  4. Thermal power systems small power systems applications project. Volume 2: Detailed report

    NASA Technical Reports Server (NTRS)

    Marriott, A. T.

    1979-01-01

    Small power system technology as applied to power plants up to 10 MW in size was considered. Markets for small power systems were characterized and cost goals were established for the project. Candidate power plant system design concepts were selected for evaluation and preliminary performance and cost assessments were made. Breakeven capital costs were determined for leading contenders among the candidate systems. The potential use of small power systems in providing part of the demand for pumping power by the extensive aqueduct system of California, was studied. Criteria and methodologies were developed for the ranking of candidate power plant system design concepts. Experimental power plant concepts of 1 MW rating were studied to define a power plant configuration for subsequent detail design construction, testing and evaluation. Site selection criteria and ground rules were developed.

  5. Training of Senior Public Health Administrators: Report of a WHO Working Group (Moscow, Russia, June 21-23, 1978).

    ERIC Educational Resources Information Center

    World Health Organization, Copenhagen (Denmark). Regional Office for Europe.

    A report of the World Health Organization (WHO) Working Group on the Training of Senior Public Health Administrators is presented. The working group met to review programs for specialized, advanced, and continuing training of senior public health administrators. WHO activities leading up to the working group and WHO's present policy and activities…

  6. 46 CFR Appendix III to Part 390 - U.S. Department of Transportation, Maritime Administration-Sample Semiannual Report

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false U.S. Department of Transportation, Maritime Administration-Sample Semiannual Report III Appendix III to Part 390 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS UNDER PUBLIC LAW 91-469 CAPITAL CONSTRUCTION FUND Pt. 390, App. III...

  7. 46 CFR Appendix III to Part 390 - U.S. Department of Transportation, Maritime Administration-Sample Semiannual Report

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false U.S. Department of Transportation, Maritime Administration-Sample Semiannual Report III Appendix III to Part 390 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS UNDER PUBLIC LAW 91-469 CAPITAL CONSTRUCTION FUND Pt. 390, App....

  8. Doctorate Needs in Educational Administration During the 1970's and 1980's: A Preliminary Analysis. A Report.

    ERIC Educational Resources Information Center

    Knezevich, S. J.

    There are no data in this research report that would support the generalization that educational administration will face a doctorate glut during the 1970's or 1980's. There is far more reason to be worried about a glut in the number of institutions producing doctorates in educational administration than about a glut in the number of doctorates…

  9. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT: RESIDENTIAL ELECTRIC POWER GENERATION USING THE PLUG POWER SU1 FUEL CELL SYSTEM

    EPA Science Inventory

    The Environmental Technology Verification report discusses the technology and performance of the Plug Power SU1 Fuel Cell System manufactured by Plug Power. The SU1 is a proton exchange membrane fuel cell that requires hydrogen (H2) as fuel. H2 is generally not available, so the ...

  10. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT: RESIDENTIAL ELECTRIC POWER GENERATION USING THE PLUG POWER SU1 FUEL CELL SYSTEM

    EPA Science Inventory

    The Environmental Technology Verification report discusses the technology and performance of the Plug Power SU1 Fuel Cell System manufactured by Plug Power. The SU1 is a proton exchange membrane fuel cell that requires hydrogen (H2) as fuel. H2 is generally not available, so the ...

  11. How Accurate are Self-Reports? An Analysis of Self-Reported Healthcare Utilization and Absence When Compared to Administrative Data

    PubMed Central

    Short, Meghan E.; Pei, Xiaofei; Tabrizi, Maryam J.; Ozminkowski, Ronald J.; Gibson, Teresa B.; DeJoy, Dave M.; Wilson, Mark G.

    2009-01-01

    Objective To determine the accuracy of self-reported healthcare utilization and absence reported on health risk assessments (HRAs) against administrative claims and human resource records. Methods Self-reported values of healthcare utilization and absenteeism were analyzed for concordance to administrative claims values. Percent agreement, Pearson’s correlations, and multivariate logistic regression models examined the level of agreement and characteristics of participants with concordance. Results Self-report and administrative data showed greater concordance for monthly compared to yearly healthcare utilization metrics. Percent agreement ranged from 30 to 99% with annual doctor visits having the lowest percent agreement. Younger people, males, those with higher education, and healthier individuals more accurately reported their healthcare utilization and absenteeism. Conclusions Self-reported healthcare utilization and absenteeism may be used as a proxy when medical claims and administrative data are unavailable, particularly for shorter recall periods. PMID:19528832

  12. 10 CFR 205.353 - Special investigation and reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Report of Major Electric Utility System... surrounding a specific power system disturbance, including the restoration procedures utilized. The report...

  13. 10 CFR 205.353 - Special investigation and reports.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Report of Major Electric Utility System... surrounding a specific power system disturbance, including the restoration procedures utilized. The report...

  14. 10 CFR 205.353 - Special investigation and reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Report of Major Electric Utility System... surrounding a specific power system disturbance, including the restoration procedures utilized. The report...

  15. 10 CFR 205.353 - Special investigation and reports.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Report of Major Electric Utility System... surrounding a specific power system disturbance, including the restoration procedures utilized. The report...

  16. 10 CFR 205.353 - Special investigation and reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Report of Major Electric Utility System... surrounding a specific power system disturbance, including the restoration procedures utilized. The report...

  17. Evaluation of Carrying Capacity : Measure 7.1A of the Northwest Power Planning Council`s 1994 Fish and Wildlife Program : Report 1 of 4, Final Report.

    SciTech Connect

    Neitzel, Duane A.; Johnson, Gary E.

    1996-05-01

    This report is one of four that the Pacific Northwest National Laboratory (PNNL) staff prepared to address Measure 7.1A in the Northwest Power Planning Council's (Council) Fish and Wildlife Program (Program) dated december 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for development of a study plan based on critical uncertainties and research needs identified during the evaluation. This report deals with the evaluation of carrying capacity. It describes the analysis of different views of capacity as it relates to salmon survival and abundance. The report ends with conclusions and recommendations for studying carrying capacity.

  18. Medication administration error reporting and associated factors among nurses working at the University of Gondar referral hospital, Northwest Ethiopia, 2015.

    PubMed

    Bifftu, Berhanu Boru; Dachew, Berihun Assefa; Tiruneh, Bewket Tadesse; Beshah, Debrework Tesgera

    2016-01-01

    Medication administration is the final step/phase of medication process in which its error directly affects the patient health. Due to the central role of nurses in medication administration, whether they are the source of an error, a contributor, or an observer they have the professional, legal and ethical responsibility to recognize and report. The aim of this study was to assess the prevalence of medication administration error reporting and associated factors among nurses working at The University of Gondar Referral Hospital, Northwest Ethiopia. Institution based quantitative cross - sectional study was conducted among 282 Nurses. Data were collected using semi-structured, self-administered questionnaire of the Medication Administration Errors Reporting (MAERs). Binary logistic regression with 95 % confidence interval was used to identify factors associated with medication administration errors reporting. The estimated medication administration error reporting was found to be 29.1 %. The perceived rates of medication administration errors reporting for non-intravenous related medications were ranged from 16.8 to 28.6 % and for intravenous-related from 20.6 to 33.4 %. Education status (AOR =1.38, 95 % CI: 4.009, 11.128), disagreement over time - error definition (AOR = 0.44, 95 % CI: 0.468, 0.990), administrative reason (AOR = 0.35, 95 % CI: 0.168, 0.710) and fear (AOR = 0.39, 95 % CI: 0.257, 0.838) were factors statistically significant for the refusal of reporting medication administration errors at p-value <0.05. In this study, less than one third of the study participants reported medication administration errors. Educational status, disagreement over time - error definition, administrative reason and fear were factors statistically significant for the refusal of errors reporting at p-value <0.05. Therefore, the results of this study suggest strategies that enhance the cultures of error reporting such as providing a clear definition of

  19. Knolls Atomic Power Laboratory environmental monitoring report, calendar year 1996

    SciTech Connect

    1996-12-31

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) sites are summarized and assessed in this report. The principal function at KAPL sites (Knolls, Kesselring, and Windsor) is research and development in the design and operation of Naval nuclear propulsion plants. The Kesselring Site is also used for the training of personnel in the operation of these plants. The Naval nuclear propulsion plant at the Windsor Site is currently being dismantled. Operations at the three KAPL sites resulted in no significant release of hazardous substances or radioactivity to the environment. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each site and at off-site background locations.

  20. Knolls Atomic Power Laboratory environmental monitoring report, calendar year 2001

    SciTech Connect

    2002-12-31

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the Knolls and Kesselring Sites and Site closure activities at the S1C Site (also known as the KAPL Windsor Site) continue to have no adverse effect on human health and the quality of the environment. The effluent and environmental monitoring programs conducted by KAPL at the Knolls and Kesselring Sites are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as environmental monitoring of air, water, sediment, and fish. Radiation measurements are also made around the perimeter of the Knolls and Kesselring Sites and at off-site background locations. The environmental monitoring program for the S1C Site continues to be reduced in scope from previous years due to the completion of Site dismantlement activities during 1999 and a return to green field conditions during 2000.

  1. Knolls Atomic Power Laboratory environmental monitoring report, calendar year 2000

    SciTech Connect

    2001-12-01

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the Knolls Site, Niskayuna, New York and the Kesselring Site, West Milton, New York and site closure activities at the S1C Site, Windsor, Connecticut, continued to have no adverse effect on human health and the quality of the environment during calendar year 2000. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each Site and at off-site background locations. Monitoring programs at the S1C Site were reduced in scope during calendar year 2000 due to completion of site dismantlement activities during 1999.

  2. MHD Advanced Power Train Phase I, Final Report, Volume 6

    SciTech Connect

    A. R. Jones

    1985-08-01

    Under contract to the Department of Energy, Westinghouse has prepared the definition of a program plan for the development of an MHD Advanced Power Train (APT). The scope of work of this contract includes conceptual designs of early commercial MHD/steam electric plants (topping/bottoming) ranging from 200 to 1000 Mw(e). These plant designs were prepared during 1982 and made use of a system analysis model that provides performance and design information and economic estimates. In early April 1984, DOE requested westinghouse to perform special studies under the existing APT contract to aid the Department in evaluating MHD program options. Two tasks were defined by DOE: the first task was to evaluate an 80 MW(t) integrated test system (with steam electric bottoming cycle) for installation at the CDIF in Butte, Montana; the second task was to investigate placing a 50 MW(e) MHD topping stage onto an existing steam electric plant (as a retrofit). This volume of the final report documents the results of these special studies. Highlights of the studies were presented orally to DOE on May 15, 1984.

  3. Solar powered hydrogen generating facility and hydrogen powered vehicle fleet. Final technical report, August 11, 1994--January 6, 1997

    SciTech Connect

    Provenzano, J.J.

    1997-04-01

    This final report describes activities carried out in support of a demonstration of a hydrogen powered vehicle fleet and construction of a solar powered hydrogen generation system. The hydrogen generation system was permitted for construction, constructed, and permitted for operation. It is not connected to the utility grid, either for electrolytic generation of hydrogen or for compression of the gas. Operation results from ideal and cloudy days are presented. The report also describes the achievement of licensing permits for their hydrogen powered trucks in California, safety assessments of the trucks, performance data, and information on emissions measurements which demonstrate performance better than the Ultra-Low Emission Vehicle levels.

  4. Marked alteration of glycemic profile surrounding lanreotide administration in acromegaly: A case report.

    PubMed

    Tanaka, Sho; Haketa, Akira; Yamamuro, Shun; Suzuki, Toshiko; Kobayashi, Hiroki; Hatanaka, Yoshinari; Ueno, Takahiro; Fukuda, Noboru; Abe, Masanori; Yoshino, Atsuo; Soma, Masayoshi

    2017-04-08

    Whether somatostatin analogs for acromegaly improve or worsen a patient's glycemic profile is controversial. A risk of hypoglycemia should be presumed, especially when patients receive insulin therapy, as the package inserts caution. However, a detailed clinical course of such a case has never been reported in research articles. An 80-year-old Japanese female diabetes patient treated with insulin therapy was diagnosed with acromegaly, and the somatostatin analog, lanreotide, was given. On day 4 of lanreotide treatment, repeated hypoglycemia as a result of exogenous insulin arose and the patient required inpatient care. After lanreotide treatment, the total daily insulin dose could be reduced, but her fasting C-peptide level decreased from 1.6 to 0.4 ng/mL, implying improved insulin resistance and impaired endogenous insulin secretion. In the present case, marked alteration surrounding lanreotide administration was observed; careful co-administration with insulin therapy is required, as the package insert cautions. © 2017 The Authors. Journal of Diabetes Investigation published by Asian Association for the Study of Diabetes (AASD) and John Wiley & Sons Australia, Ltd.

  5. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007 (Revised)

    SciTech Connect

    Wiser, R.; Bolinger, M.

    2008-05-01

    This report focuses on key trends in the U.S. wind power market, with an emphasis on the latest year, and presents a wealth of data, some of which has not historically been mined by wind power analysts.

  6. Establishment of the International Power Institute. Final technical report

    SciTech Connect

    Julius E. Coles

    2000-08-04

    The International Power Institute, in collaboration with American industries, seeks to address technical, political, economic and cultural issues of developing countries in the interest of facilitating profitable transactions in power related infrastructure projects. IPI works with universities, governments and commercial organizations to render project-specific recommendations for private-sector investment considerations. IPI also established the following goals: Facilitate electric power infrastructure transactions between developing countries and the US power industry; Collaborate with developing countries to identify development strategies to achieve energy stability; and Encourage market driven solutions and work collaboratively with other international trade energy, technology and banking organizations.

  7. Certification report for the CALMAC solar powered pump

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The certification of the CALMAC solar powered thermopump is presented. Each element of the specification is delineated, together with the verification, based on analysis, similarity, inspection, or testing.

  8. Accelerating Acceptance of Fuel Cell Backup Power Systems - Final Report

    SciTech Connect

    Petrecky, James; Ashley, Christopher

    2014-07-21

    Since 2001, Plug Power has installed more than 800 stationary fuel cell systems worldwide. Plug Power’s prime power systems have produced approximately 6.5 million kilowatt hours of electricity and have accumulated more than 2.5 million operating hours. Intermittent, or backup, power products have been deployed with telecommunications carriers and government and utility customers in North and South America, Europe, the United Kingdom, Japan and South Africa. Some of the largest material handling operations in North America are currently using the company’s motive power units in fuel cell-powered forklifts for their warehouses, distribution centers and manufacturing facilities. The low-temperature GenSys fuel cell system provides remote, off-grid and primary power where grid power is unreliable or nonexistent. Built reliable and designed rugged, low- temperature GenSys delivers continuous or backup power through even the most extreme conditions. Coupled with high-efficiency ratings, low-temperature GenSys reduces operating costs making it an economical solution for prime power requirements. Currently, field trials at telecommunication and industrial sites across the globe are proving the advantages of fuel cells—lower maintenance, fuel costs and emissions, as well as longer life—compared with traditional internal combustion engines.

  9. Closed Brayton Cycle Power Conversion Unit for Fission Surface Power Phase I Final Report

    NASA Technical Reports Server (NTRS)

    Fuller, Robert L.

    2010-01-01

    A Closed Brayton cycle power conversion system has been developed to support the NASA fission surface power program. The goal is to provide electricity from a small nuclear reactor heat source for surface power production for lunar and Mars environments. The selected media for a heat source is NaK 78 with water as a cooling source. The closed Brayton cycle power was selected to be 12 kWe output from the generator terminals. A heat source NaK temperature of 850 K plus or minus 25 K was selected. The cold source water was selected at 375 K plus or minus 25 K. A vacuum radiation environment of 200 K is specified for environmental operation. The major components of the system are the power converter, the power controller, and the top level data acquisition and control unit. The power converter with associated sensors resides in the vacuum radiation environment. The power controller and data acquisition system reside in an ambient laboratory environment. Signals and power are supplied across the pressure boundary electrically with hermetic connectors installed on the vacuum vessel. System level analyses were performed on working fluids, cycle design parameters, heater and cooling temperatures, and heat exchanger options that best meet the needs of the power converter specification. The goal is to provide a cost effective system that has high thermal-to-electric efficiency in a compact, lightweight package.

  10. Development and use of reporting guidelines for assessing the quality of validation studies of health administrative data.

    PubMed

    Benchimol, Eric I; Manuel, Douglas G; To, Teresa; Griffiths, Anne M; Rabeneck, Linda; Guttmann, Astrid

    2011-08-01

    Validation of health administrative data for identifying patients with different health states (diseases and conditions) is a research priority, but no guidelines exist for ensuring quality. We created reporting guidelines for studies validating administrative data identification algorithms and used them to assess the quality of reporting of validation studies in the literature. Using Standards for Reporting of Diagnostic accuracy (STARD) criteria as a guide, we created a 40-item checklist of items with which identification accuracy studies should be reported. A systematic review identified studies that validated identification algorithms using administrative data. We used the checklist to assess the quality of reporting. In 271 included articles, goals and data sources were well reported but few reported four or more statistical estimates of accuracy (36.9%). In 65.9% of studies reporting positive predictive value (PPV)/negative predictive value (NPV), the prevalence of disease in the validation cohort was higher than in the administrative data, potentially falsely elevating predictive values. Subgroup accuracy (53.1%) and 95% confidence intervals for accuracy measures (35.8%) were also underreported. The quality of studies validating health states in the administrative data varies, with significant deficits in reporting of markers of diagnostic accuracy, including the appropriate estimation of PPV and NPV. These omissions could lead to misclassification bias and incorrect estimation of incidence and health services utilization rates. Use of a reporting checklist, such as the one created for this study by modifying the STARD criteria, could improve the quality of reporting of validation studies, allowing for accurate application of algorithms, and interpretation of research using health administrative data. Copyright © 2011 Elsevier Inc. All rights reserved.

  11. Power transformer oil leak mitigation -- technology assessment. Final report

    SciTech Connect

    Braun, J.M.; Azizian, H.; Kotowicz, M.; Lewak, R.; Maak, P.; McGoey, L.

    1998-12-01

    An assessment of in-situ power transformers leak repair technologies was performed, addressing the severe multi-stress environment of an operating transformer, combining vibration, extremes of temperature (from {minus}40 C to well over 100 C), UV exposure, and thermal aging, in addition to poor application conditions on oily surfaces. Oil leaks can originate from gas relay piping, packing on valves, CT pockets, tap changers, radiators and main tank covers; focus on the present activity was on flanges for radiators and pumps for units 25 MVA and up. The range of applicability of welding technologies was established. The recommended process for field weld repairing is Flux Cored Arc (FCAW), either in the semi-automatic mode (hand held) or in a mechanized mode (travel carriage). SMAW (Shielded Metal Arc Welding) should be considered as a second choice after FCAW (only for materials 1/4 inches and thicker). Welding repairs completed with an oil backing have no risk of paint carbonization; with an air backing, 1/2 inch material and thicker can be welded without concern while a multi-pass technique should be used for welding 1/4 inch thick material. The best welding procedures were compiled into a free standing document, ``Guidelines for Repair Welding Transformer Components Using the Shielded Metal Arc Welding and Flux Cored Arc Welding Processes,`` included in the present report. It is recommended that further development be undertaken in the more challenging vertical welding position using both SMAW and FCAW. In addition, it is recommended that repair welding techniques be developed for repair of corrosion leaks on radiators.

  12. Preconstruction of the Honey Lake Hybrid Power Plant: Final report

    SciTech Connect

    Not Available

    1988-04-30

    The work undertaken under this Contract is the prosecution of the preconstruction activities, including preliminary engineering design, well field development, completion of environmental review and prosecution of permits, and the economic and financial analysis of the facility. The proposed power plant is located in northeastern California in Lassen County, approximately 25 miles east of the town of Susanville. The power plant will use a combination of wood residue and geothermal fluids for power generation. The plant, when fully constructed, will generate a combined net output of approximately 33 megawatts which will be sold to Pacific Gas and Electric Company (PGandE) under existing long-term power sales contracts. Transfer of electricity to the PGandE grid will require construction of a 22-mile transmission line from the power plant to Susanville. 11 refs., 12 figs., 4 tabs.

  13. Nuclear power generation and fuel cycle report 1997

    SciTech Connect

    1997-09-01

    Nuclear power is an important source of electric energy and the amount of nuclear-generated electricity continued to grow as the performance of nuclear power plants improved. In 1996, nuclear power plants supplied 23 percent of the electricity production for countries with nuclear units, and 17 percent of the total electricity generated worldwide. However, the likelihood of nuclear power assuming a much larger role or even retaining its current share of electricity generation production is uncertain. The industry faces a complex set of issues including economic competitiveness, social acceptance, and the handling of nuclear waste, all of which contribute to the uncertain future of nuclear power. Nevertheless, for some countries the installed nuclear generating capacity is projected to continue to grow. Insufficient indigenous energy resources and concerns over energy independence make nuclear electric generation a viable option, especially for the countries of the Far East.

  14. Static reactive power compensators for high-voltage power systems. Final report

    SciTech Connect

    Not Available

    1981-04-01

    A study conducted to summarize the role of static reactive power compensators for high voltage power system applications is described. This information should be useful to the utility system planning engineer in applying static var systems (SVS) to high voltage as (HVAC) systems. The static var system is defined as a form of reactive power compensator. The general need for reactive power compensation in HVAC systems is discussed, and the static var system is compared to other devices utilized to provide reactive power compensation. Examples are presented of applying SVS for specific functions, such as the prevention of voltage collapse. The operating principles of commercially available SVS's are discussed in detail. The perormance and active power loss characteristics of SVS types are compared.

  15. Clean air program. Use of hydrogen to power the advanced technology transit bus (ATTB): An assessment. Final report, July 1996-June 1997

    SciTech Connect

    Raj, P.K.

    1997-11-01

    The Advanced Technology Transit Bus (ATTB), developed under primary funding from the U.S. DOT/Federal Transit Administration (FTA), currently uses a power plant based on a natural gas burning IC engine-generator set. FTA is interested in demonstrating the use of a hydrogen fuel cell-based power plant on the ATTB. This report analyzes several issues related to the proposed demonstration project including hydrogen safety, hydrogen storage options, and total hydrogen requirements.

  16. Final Report: Assessment of Combined Heat and Power Premium Power Applications in California

    SciTech Connect

    Norwood, Zack; Lipman, Tim; Marnay, Chris; Kammen, Dan

    2008-09-30

    This report analyzes the current economic and environmental performance of combined heat and power (CHP) systems in power interruption intolerant commercial facilities. Through a series of three case studies, key trade-offs are analyzed with regard to the provision of black-out ridethrough capability with the CHP systems and the resutling ability to avoid the need for at least some diesel backup generator capacity located at the case study sites. Each of the selected sites currently have a CHP or combined heating, cooling, and power (CCHP) system in addition to diesel backup generators. In all cases the CHP/CCHP system have a small fraction of the electrical capacity of the diesel generators. Although none of the selected sites currently have the ability to run the CHP systems as emergency backup power, all could be retrofitted to provide this blackout ride-through capability, and new CHP systems can be installed with this capability. The following three sites/systems were used for this analysis: (1) Sierra Nevada Brewery - Using 1MW of installed Molten Carbonate Fuel Cells operating on a combination of digestor gas (from the beer brewing process) and natural gas, this facility can produce electricty and heat for the brewery and attached bottling plant. The major thermal load on-site is to keep the brewing tanks at appropriate temperatures. (2) NetApp Data Center - Using 1.125 MW of Hess Microgen natural gas fired reciprocating engine-generators, with exhaust gas and jacket water heat recovery attached to over 300 tons of of adsorption chillers, this combined cooling and power system provides electricity and cooling to a data center with a 1,200 kW peak electrical load. (3) Kaiser Permanente Hayward Hospital - With 180kW of Tecogen natural gas fired reciprocating engine-generators this CHP system generates steam for space heating, and hot water for a city hospital. For all sites, similar assumptions are made about the economic and technological constraints of the

  17. The State of Small Business: A Report of the President. Together with the Annual Report on Small Business and Competition of the Small Business Administration.

    ERIC Educational Resources Information Center

    Executive Office of the President, Washington, DC.

    This volume consists of a report of the President concerning the state of small businesses as well as the U.S. Small Business Administration annual report on small business and competition. Addressed in the President's report are the following issues: the role of small business in the economy; the foundations of small business policy; and problems…

  18. H.R. 599: A Bill to provide for the reconstitution of outstanding repayment obligations of the Administrator of the Bonneville Power Administration for the appropriated capital investments in the Federal Columbia River Power System. Introduced in the House of Representatives, One Hundred Fourth Congress, First session

    SciTech Connect

    1995-12-31

    This bill proposes to give the administrator of the Bonneville Power Administration the rights to refinance certain capital investments in the Federal Columbia River Power System. The act spells out how to distinguish old and new capital investments, how new principal amounts for old investments are calculated, interest rates and repayment dates. It also deals with interest rates for new capital investments during and after construction, appropriations for the Colville Reservation Grand Coulee Dam Settlement Act, and suggested contract provisions regarding future contracts.

  19. Sulfites--a food and drug administration review of recalls and reported adverse events.

    PubMed

    Timbo, Babgaleh; Koehler, Kathleen M; Wolyniak, Cecilia; Klontz, Karl C

    2004-08-01

    Sulfite-sensitive individuals can experience adverse reactions after consuming foods containing sulfiting agents (sulfites), and some of these reactions may be severe. In the 1980s and 1990s, the U.S. Food and Drug Administration (FDA) acted to reduce the likelihood that sulfite-sensitive individuals would unknowingly consume foods containing sulfites. The FDA prohibited the use of sulfites on fruits and vegetables (except potatoes) to be served or presented fresh to the public and required that the presence of detectable levels of sulfites be declared on food labels, even when these sulfites are used as a processing aid or are a component of another ingredient in the food. In the present study, data from FDA recall records and adverse event reports were used to examine the current status of problems of sensitivity to sulfites in foods. From 1996 through 1999, the FDA processed a total of 59 recalls of foods containing undeclared sulfites; these 59 recalls involved 93 different food products. Fifty (55%) of the recalled products were classified as class I, a designation indicating that a consumer reasonably could have ingested > or = 10 mg of undeclared sulfites on a single occasion, a level that could potentially cause a serious adverse reaction in a susceptible person. From 1996 through mid-1999, the FDA received a total of 34 reports of adverse reactions allegedly due to eating foods containing undeclared sulfites. The average of 10 reports per year, although derived from a passive surveillance system, was lower than the average of 111 reports per year that the FDA received from 1980 to 1987, a decrease that may have resulted in part from FDA regulatory action.

  20. Comparison of poisonings managed at military and Veterans Administration hospitals reported to Texas poison centers.

    PubMed

    Forrester, M B

    2017-01-01

    There is little information on poisonings managed at military and Veterans Administration (VA) hospitals. This investigation described and compared poisonings reported to Texas poison centers that were managed at military and VA hospitals. Retrospective analysis of poison centre data. Cases were poisonings among patients aged 18 years or more reported to Texas poison centers during 2000-2015 where management occurred at a military or VA hospital. The distribution of exposures for various demographic and clinical factors was determined for military and veterans hospitals and comparisons were made between the two groups. There were 4353 and 1676 poisonings managed at military and VA hospitals, resepctively. Males accounted for 50.5% of the military hospital patients and 84.9% of the VA hospital patients. The mean age for military hospital patients was 31 years and for VA hospital patients was 50 years. The proportion of poisonings managed at military hospitals and VA hospitals, respectively, were intentional (70.0% vs 64.1%), particularly suspected attempted suicide (57.3% vs 47.7%), and unintentional (25.0% vs 30.5%). More than one substance was reported in 37.7% of military and 33.2% of VA hospital poisonings. The most commonly reported substance categories for poisonings managed at military and VA hospitals, respectively, were analgesics (28.4% vs 19.7%), sedatives/hypnotics/antipsychotics (24.7% vs 23.4%), antidepressants (18.7% vs 19.7%) and alcohol (11.3% vs 10.6%). A number of differences were observed between poisonings managed at military and VA hospitals. These differing patterns of poisonings may need to be taken into account in the education, prevention and treatment of poisonings at these hospitals and among the populations they serve. Copyright © 2016 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.