46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with... radios, if installed, may be powered from a local lighting power source, such as the pilothouse lighting panel, provided each radio power source has a separate overcurrent protection device. ...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with... radios, if installed, may be powered from a local lighting power source, such as the pilothouse lighting panel, provided each radio power source has a separate overcurrent protection device. ...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with... radios, if installed, may be powered from a local lighting power source, such as the pilothouse lighting panel, provided each radio power source has a separate overcurrent protection device. ...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with... radios, if installed, may be powered from a local lighting power source, such as the pilothouse lighting panel, provided each radio power source has a separate overcurrent protection device. ...
14 CFR Appendix H to Part 23 - Installation of An Automatic Power Reserve (APR) System
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation of An Automatic Power Reserve (APR) System H Appendix H to Part 23 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... AIRPLANES Pt. 23, App. H Appendix H to Part 23—Installation of An Automatic Power Reserve (APR) System H23.1...
Lessons learned from hybrid wind/PV village power system installations in Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bergey, M.
1995-09-01
In the last three years eight decentralized village power systems utilizing small wind turbines as the primary energy source have been installed in rural Mexico. Hybrid wind/PV systems have been installed in five States and by three vendors. Seven out of the eight systems, which range i size from 9.3--71.2kW in combined wind and PV capacity, utilize one or more 10 kW wind turbines. All of these installations have battery banks and use static inverters to provide AC power for distribution to homes, businesses, and community facilities. On all but one of the systems a diesel generator is used tomore » provide back-up power. This paper attempts to summarize the range of costs and economics, performance, and operational experiences for all eight installations. Several of the systems are monitored for performance, including one that is extensively monitored under a cooperative program between the Instituto de Investigaciones Electricas and Sandia National Laboratory. Lessons learned from these systems provide insights that may allow future village power systems of this architecture to be installed at lower costs, to be operated more effectively and efficiently, and to be better able to satisfy customer requirements.« less
Optimization of hybrid power system composed of SMES and flywheel MG for large pulsed load
NASA Astrophysics Data System (ADS)
Niiyama, K.; Yagai, T.; Tsuda, M.; Hamajima, T.
2008-09-01
A superconducting magnetic storage system (SMES) has some advantages such as rapid large power response and high storage efficiency which are superior to other energy storage systems. A flywheel motor generator (FWMG) has large scaled capacity and high reliability, and hence is broadly utilized for a large pulsed load, while it has comparatively low storage efficiency due to high mechanical loss compared with SMES. A fusion power plant such as International Thermo-Nuclear Experimental Reactor (ITER) requires a large and long pulsed load which causes a frequency deviation in a utility power system. In order to keep the frequency within an allowable deviation, we propose a hybrid power system for the pulsed load, which equips the SMES and the FWMG with the utility power system. We evaluate installation cost and frequency control performance of three power systems combined with energy storage devices; (i) SMES with the utility power, (ii) FWMG with the utility power, (iii) both SMES and FWMG with the utility power. The first power system has excellent frequency power control performance but its installation cost is high. The second system has inferior frequency control performance but its installation cost is the lowest. The third system has good frequency control performance and its installation cost is attained lower than the first power system by adjusting the ratio between SMES and FWMG.
Digital control for the condensate system in a combined cycle power plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanchez Parra, M.; Fuentes Gutierrez, J.E.; Castelo Cuevas, L.
1994-12-31
This paper presents the highlights by means of which development, installation and start up of the digital control system (DCS)for the condenser and hotwell (condensate system) were performed. This system belongs to the distributed control system installed by the Instituto de Investigaciones Electricas (IIE) at the Combined Cycle Power Plant in Gomez Palacio (GP), Durango, Mexico, during the February-March period, in 1993. The main steps for development of the condenser and hotwell control system include: process modeling, definition of control strategies, algorithms, design and software development, PC simulation tests, laboratory tests with an equipment similar to the one installed atmore » the GP Power Plant, installation, and finally, start up, which was a joint effort with the GP Power Plant engineering staff.« less
Power system interface and umbilical system study
NASA Technical Reports Server (NTRS)
1980-01-01
System requirements and basic design criteria were defined for berthing or docking a payload to the 25 kW power module which will provide electrical power and attitude control, cooling, data transfer, and communication services to free-flying and Orbiter sortie payloads. The selected umbilical system concept consists of four assemblies and command and display equipment to be installed at the Orbiter payload specialist station: (1) a movable platen assembly which is attached to the power system with EVA operable devices; (2) a slave platen assembly which is attached to the payload with EVA operable devices; (3) a fixed secondary platen permanently installed in the power system; and (4) a fixed secondary platen permanently installed on the payload. Operating modes and sequences are described.
14 CFR Appendix I to Part 25 - Installation of an Automatic Takeoff Thrust Control System (ATTCS)
Code of Federal Regulations, 2010 CFR
2010-01-01
...) This appendix specifies additional requirements for installation of an engine power control system that... crew to increase thrust or power. I25.2Definitions. (a) Automatic Takeoff Thrust Control System (ATTCS... mechanical and electrical, that sense engine failure, transmit signals, actuate fuel controls or power levers...
Power Supply Changes for NSTX Resistive Wall Mode Coils
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramakrishnan, S S.
The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physics Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. Prior to 2004, the NSTX power system was feeding twelve (12) circuits in the machine. In 2004 the Resistive Wall Mode (RWM) Coils were installed on the machine to correct error fields. There are six of these coils installed around the machine in the mid-plane. Since these coils needmore » fast and accurate controls, a Switching Power Amplifier (SPA) with three sub-units was procured, installed and commissioned along with other power loop components. Two RWM Coils were connected in series and fed from one SPA sub-unit. After the initial RWM campaign, operational requirements evolved such that each of the RWM coils now requires separate power and control. Hence a second SPA with three sub-units has been procured and installed. The second unit is of improved design and has the controls and power components completely isolated. The existing thyristor rectifier is used as DC Link to both of the Switching Power Amplifiers. The controls for the RWM are integrated into the overall computer control of the DC Power systems for NSTX. This paper describes the design changes in the RWM Power system for NSTX.« less
The introduction of space technology power systems into developing countries
NASA Technical Reports Server (NTRS)
Roberts, Allen F.; Ratajczak, Anthony F.
1989-01-01
Between 1978 and 1984, NASA-Lewis was responsible for the design, fabrication, installation and operational support of 57 photovoltaic power systems in 27 countries. These systems were installed in locations not served by a central power system and ranged in size from 40 W for powering street lights to 29 kW for providing power to a complete village. Several of the system projects had socio/economic studies components that provided for an assessment of how the introduction of both electricity and a novel high technology power system affected the users and their society.
A new bipolar Qtrim power supply system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mi, C.; Bruno, D.; Drozd, J.
2015-05-03
This year marks the 15th run of RHIC (Relativistic Heavy Ion Collider) operations. The reliability of superconducting magnet power supplies is one of the essential factors in the entire accelerator complex. Besides maintaining existing power supplies and their associated equipment, newly designed systems are also required based on the physicist’s latest requirements. A bipolar power supply was required for this year’s main quadruple trim power supply. This paper will explain the design, prototype, testing, installation and operation of this recently installed power supply system.
NASA Technical Reports Server (NTRS)
Hein, G. F.
1982-01-01
The NASA Lewis Research Center in cooperation with the World Health Organization, U.S.A. I.D., the Pan American Health Organization and national government agencies in some developing countries sponsored the installation of twenty photovoltaic powered medical vaccine storage refrigerator-freezer (R/F) systems. The Solar Power Corporation was selected as the contractor to perform the design, development and installation of these twenty units. Solar Power's experiences are described herein.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McKegg, A.
On February 6, 1987, Westinghouse Industry Services Queensland and Integrated Power Corporation (IPC) of Rockville, Maryland began their joint effort to design, build and install a hybrid photovoltaic/diesel power generation station. Installation began on June 1, 1987 and the system was operational on October 30, 1987. The system combines the quality, reliability and low operating costs of photovoltaics with the lower capital cost, high energy density and high efficiency at full load of diesel generators. The performance of the Coconut Island power system has been an unquestioned success. Power availability has exceeded 99 percent, a level comparable with local utilities.more » Energy capacity has not only met projections, but the system's flexibility has allowed energy output to be increased 40 percent beyond design level to accommodate the Islanders' enthusiastic demand for power. The power describes the design, performance, installation, and acceptance of the hybrid system. A table lists technical applications.« less
Effect of distributed generation installation on power loss using genetic algorithm method
NASA Astrophysics Data System (ADS)
Hasibuan, A.; Masri, S.; Othman, W. A. F. W. B.
2018-02-01
Injection of the generator distributed in the distribution network can affect the power system significantly. The effect that occurs depends on the allocation of DG on each part of the distribution network. Implementation of this approach has been made to the IEEE 30 bus standard and shows the optimum location and size of the DG which shows a decrease in power losses in the system. This paper aims to show the impact of distributed generation on the distribution system losses. The main purpose of installing DG on a distribution system is to reduce power losses on the power system.Some problems in power systems that can be solved with the installation of DG, one of which will be explored in the use of DG in this study is to reduce the power loss in the transmission line. Simulation results from case studies on the IEEE 30 bus standard system show that the system power loss decreased from 5.7781 MW to 1,5757 MW or just 27,27%. The simulated DG is injected to the bus with the lowest voltage drop on the bus number 8.
Review of stand-alone photovoltaic application projects sponsored by US DOE and US AID
NASA Technical Reports Server (NTRS)
Bifano, W. J.
1981-01-01
Experience with dc photovoltaic systems (without backup power) and ranging in output from 23 to 3,500 peak watts, in a wide range of environmental conditions and with a wide range of insolation, is described. Cooperation of NASA with other government agencies resulted in the installation of an air pollution monitor in New Jersey, a seismic sensor in Hawaii, power for lookout towers in national forests in California, an electric power system for a Papago Indian village in Arizona, and a power system for a grain mill and water pump in Tangaye, Upper Volta. Significant operational results are discussed and system reliability is assessed for the 20 experimental systems installed since 1976. Additional systems to be installed overseas are highlighted, and economic factors are considered.
Automated installation methods for photovoltaic arrays
NASA Astrophysics Data System (ADS)
Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.
1982-11-01
Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
NASA Technical Reports Server (NTRS)
Kaszeta, William J.
1987-01-01
Five different types of public service photovoltaic power/load systems installed in the Gabonese Republic are discussed. The village settings, the systems, performance results and some problems encountered are described. Most of the systems performed well, but some of the systems had problems due to failure of components or installation errors. The project was reasonably successful in collecting and reporting data for system performance evaluation that will be useful for guiding officials and system designers involved in village power applications in developing countries.
McClellan PV system installation provides key lessons
NASA Astrophysics Data System (ADS)
Kauffman, W. R.
Design features and lessons learned in the installation of a 40 kWp solar cell array to supply power to a market on an airbase are outlined. The fixed-position modules interface with an inverter, ac and dc switchgear, controls, instrumentation, and an energy management system. The power control unit has a peak power tracking feature to maximize output from the 1142 cell modules. The inverter has functioned at over 98 percent efficiency near the 25 kW design range of the array. Moisture sealing to prevent ground faults was found necessary during the installation of the underground cabling.
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
Update on the Puerto Rico Electric Power Authority`s spinning reserve battery system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, P.A.
1996-11-01
The Puerto Rico Electric Power Authority completed start-up testing and began commercial operation of a 20MW/14MWh battery energy storage facility in April 1995. The battery system was installed to provide rapid spinning reserve and frequency control for the utility`s island electrical system. This paper outlines the needs of an island utility for rapid spinning reserve; identifies Puerto Rico`s unique challenges; reviews the technical and economic analyses that justified installation of a battery energy system; describes the storage facility that was installed; and presents preliminary operating results of the facility.
Centralized vs decentralized lunar power system study
NASA Astrophysics Data System (ADS)
Metcalf, Kenneth; Harty, Richard B.; Perronne, Gerald E.
1991-09-01
Three power-system options are considered with respect to utilization on a lunar base: the fully centralized option, the fully decentralized option, and a hybrid comprising features of the first two options. Power source, power conditioning, and power transmission are considered separately, and each architecture option is examined with ac and dc distribution, high and low voltage transmission, and buried and suspended cables. Assessments are made on the basis of mass, technological complexity, cost, reliability, and installation complexity, however, a preferred power-system architecture is not proposed. Preferred options include transmission based on ac, transmission voltages of 2000-7000 V with buried high-voltage lines and suspended low-voltage lines. Assessments of the total cost associated with the installations are required to determine the most suitable power system.
NASA Astrophysics Data System (ADS)
Chemekov, V. V.; Kharchenko, V. V.
2013-03-01
Matters concerned with setting up environmentally clean supply of heat to dwelling houses in the resort zone of the Russian Black Sea coast on the basis of air-water type heat pumps powered from wind power installations are discussed. The investigations were carried out as applied to the system supplying heat for an individual dwelling house with an area of around 300 m2 situated in the Tuapse city. The design heat load of the building's heating system is around 8.3 kW. The Viessmann Vitocal 300 AW pump is chosen as the main source of heat supply, and a 4-kW electric heater built into a storage tank is chosen as a standby source. The selected wind power installation (the EuroWind 10 unit) has a power capacity of 13 kWe.
A photovoltaic power system in the remote African village of Tangaye, Upper Volta
NASA Technical Reports Server (NTRS)
Bifano, W. J.; Ratajczak, A. F.; Martz, J. E.
1979-01-01
A photovoltaic (PV) system powering a grain mill and a water pump was installed in the remote West African village of Tangaye, Upper Volta. Village characteristics as well as system design, hardware, installation and operation to date are described. The PV system cost is discussed. A baseline socio-economic study performed and a follow-up study is planned to determine the impact of the system on the villagers.
78 FR 23685 - Airworthiness Directives; The Boeing Company
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-22
... installing new operational software for the electrical load management system and configuration database. The..., installing a new electrical power control panel, and installing new operational software for the electrical load management system and configuration database. Since the proposed AD was issued, we have received...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
An Administrator's Guide to Installing a Telephone System.
ERIC Educational Resources Information Center
Forbes, Phyllis Rossiter
1986-01-01
Guidelines for administrators concerning installation of a new campus telephone system address these issues: where to start; location and emergency power; the project team; paperwork; communication among those involved in installation; working with the local operating company; existing wiring; the external cable plant; special needs; and training…
46 CFR 129.550 - Power for cooking and heating.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Power for cooking and heating. 129.550 Section 129.550... INSTALLATIONS Miscellaneous Electrical Systems § 129.550 Power for cooking and heating. (a) Equipment for cooking and heating must be suitable for marine use. Equipment designed and installed to comply with ABYC...
46 CFR 129.356 - Battery installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...
46 CFR 129.356 - Battery installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...
46 CFR 129.356 - Battery installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...
46 CFR 129.356 - Battery installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...
46 CFR 129.356 - Battery installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Agazzone, U.; Ausiello, F.P.
1981-06-23
A power-generating installation comprises a plurality of modular power plants each comprised of an internal combustion engine connected to an electric machine. The electric machine is used to start the engine and thereafter operates as a generator supplying power to an electrical network common to all the modular plants. The installation has a control and protection system comprising a plurality of control modules each associated with a respective plant, and a central unit passing control signals to the modules to control starting and stopping of the individual power plants. Upon the detection of abnormal operation or failure of its associatedmore » power plant, each control module transmits an alarm signal back to the central unit which thereupon stops, or prevents the starting, of the corresponding power plant. Parameters monitored by each control module include generated current and inter-winding leakage current of the electric machine.« less
NASA Astrophysics Data System (ADS)
Butuzov, V. A.; Amerkhanov, R. A.; Grigorash, O. V.
2018-05-01
Solar and geothermal energy systems are shown to have received the widest use among all kinds of renewable sources of energy for heat supply purposes around the world. The power capacities and amounts of thermal energy generated by solar and geothermal heat supply systems around the world are presented by way of comparison. The thermal power capacity of solar heat supply systems installed around the world as of 2015 totaled 268.1 GW, and the thermal energy generated by them amounted to 225 TW h/year. The thermal power capacity of geothermal heat supply systems installed around the world totaled 70.3 GW, and the thermal energy generated by them amounted to 163 TW h/year. Information on the geothermal heat supply systems in the leading countries around the world based on the data reported at the World Geothermal Congress held in 2015 is presented. It is shown that China, with the installed thermal power capacities of its geothermal heat supply stations totaling 17.87 GW and the amount of thermal energy generated per annum equal to 48.435 TW h/year, is the world's leader in this respect. The structures of geothermal heat supply systems by the kinds of heat consumption used around the world are presented. The systems equipped with geothermal heat pumps accounted for 70.95% in the total installed capacity and for 55.3% in the total amount of generated heat. For systems that do not use heat pumps, those serving for pools account for the largest share amounting to 44.74% in installed capacity and to 45.43% in generated heat. A total of 2218 geothermal wells with the total length equal to 9534 km (with 38.7% of them for heat supply purposes) were drilled in 42 countries in the period from 2010 to 2014. In Russia, geothermal heat supply systems are in operation mainly in Dagestan, in Krasnodar krai, and in Kamchatka. The majority of these systems have been made without breaking the stream after the well outlet. A cyclic control arrangement is also used. The combined geothermal and solar heat supply system with an installed thermal power capacity of 5 MW that is in operation in the Rozovyi settlement, Krasnodar krai, is described. In the summer time, the solar installation with a capacity of 115 kW is used for supplying hot water to residential houses and for restoring the geothermal well pore pressure. The basic process circuit and characteristics of the geothermal heat supply system with the installed thermal power capacity of 8.7 MW operating in the Khankala settlement, the city of Groznyi, are given. The specific feature of this system is that the spent geothermal heat carrier is reinjected into a specially drilled inclined well. Advanced geothermal heat supply technologies involving reinjection of the spent geothermal heat carrier, combination with binary power units, use of heat pumps for recovering the spent heat carrier, and protection of equipment from corrosion and deposits are proposed.
14 CFR 23.1309 - Equipment, systems, and installations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... chapter and that requires a power supply is an “essential load” on the power supply. The power sources and the system must be able to supply the following power loads in probable operating combinations and for probable durations: (1) Loads connected to the power distribution system with the system functioning...
Analysis of the harmonics and power-factor effects at a utility-inertied photovoltaic system
NASA Astrophysics Data System (ADS)
Campen, G. L.
The harmonics and power factor characteristics and effects of a single residential photovoltaic (PV) installation using a line commutated inverter are outlined. The data were taken during a 5 day measurement program at a prototype residential PV installation in Arizona. The magnitude and phase of various currents and voltages from the fundamental to the 13th harmonic were recorded both with and without the operation of the PV system. A candidate method of modeling the installation for computer studies of larger concentrations is given.
77 FR 2926 - Airworthiness Directives; Agusta S.p.A. Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-20
... airworthy GCU, P/N 1152550-4 or 1152550-5, to improve electrical power generation and distribution system... installing wiring to the power distribution panel, and installing a No. 1 and No. 2 GCU with P/N 1152550-4 or... Government and the States, or on the distribution of power and responsibilities among the various levels of...
Flow Simulation of Modified Duct System Wind Turbines Installed on Vehicle
NASA Astrophysics Data System (ADS)
Rosly, N.; Mohd, S.; Zulkafli, M. F.; Ghafir, M. F. Abdul; Shamsudin, S. S.; Muhammad, W. N. A. Wan
2017-10-01
This study investigates the characteristics of airflow with a flow guide installed and output power generated by wind turbine system being installed on a pickup truck. The wind turbine models were modelled by using SolidWorks 2015 software. In order to investigate the characteristic of air flow inside the wind turbine system, a computer simulation (by using ANSYS Fluent software) is used. There were few models being designed and simulated, one without the rotor installed and another two with rotor installed in the wind turbine system. Three velocities being used for the simulation which are 16.7 m/s (60 km/h), 25 m/s (90 km/h) and 33.33 m/s (120 km/h). The study proved that the flow guide did give an impact to the output power produced by the wind turbine system. The predicted result from this study is the velocity of the air inside the ducting system of the present model is better that reference model. Besides, the flow guide implemented in the ducting system gives a big impact on the characteristics of the air flow.
NASA Astrophysics Data System (ADS)
Bezruchko, Konstantin; Davidov, Albert
2009-01-01
In the given article scientific and technical complex for modeling, researching and testing of rocket-space vehicles' power installations which was created in Power Source Laboratory of National Aerospace University "KhAI" is described. This scientific and technical complex gives the opportunity to replace the full-sized tests on model tests and to reduce financial and temporary inputs at modeling, researching and testing of rocket-space vehicles' power installations. Using the given complex it is possible to solve the problems of designing and researching of rocket-space vehicles' power installations efficiently, and also to provide experimental researches of physical processes and tests of solar and chemical batteries of rocket-space complexes and space vehicles. Scientific and technical complex also allows providing accelerated tests, diagnostics, life-time control and restoring of chemical accumulators for rocket-space vehicles' power supply systems.
New concept for a general purpose subsea installation system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Citi, G.; Cowen, S.; Radicioni, A.
1996-12-31
The first use of the Agip SAF System (Sistema Alti Fondali), an installation and maintenance system for subsea production systems up to 1,000 m water depth, was successfully performed on the Luna 40 well in 180 m w.d. The system successfully installed the christmas tree, flowline jumpers, control system and high pressure cap as well as deploying the LMRP to allow the commissioning of the well. The SAF system performed all the planned tasks during the installation of the Luna 40 subsea tree and now has to be considered an operational success. The system is based around a Master Vehiclemore » that provides hydraulic power to, and controls a set of dedicated work modules. During the 2 test and 5 working dives, the Master Vehicle and the modules were subsea for a considerable period of time, up to 75 hours continuously, without any operational failures. This installation uncovered some system deficiencies that will have to be studied to improve the reliability and operability of the system. From the experience gained during this operation it has been shown that the system of a Master Vehicle providing locally generated hydraulic power is a feasible approach to many subsea installation problems. This paper describes the SAF system including improvements to be performed before being used operationally in up to 1,000 m of water and over. It also covers the necessary modifications required to allow the system to be deployed from a wide range of installation vessel.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
A. Ilic; E. Baker; R. Hatcher
The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physic Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. The design of the NSTX electrical power system was tailored to suit the available infrastructure and electrical equipment on site. Components were analyzed to verify their suitability for use in NSTX. The total number of circuits and the location of the NSTX device drove the major changes in themore » Power system hardware. The NSTX has eleven (11) circuits to be fed as compared to the basic three power loops for TFTR. This required changes in cabling to insure that each cable tray system has the positive and negative leg of cables in the same tray. Also additional power cabling had to be installed to the new location. The hardware had to b e modified to address the need for eleven power loops. Power converters had to be reconnected and controlled in anti-parallel mode for the Ohmic heating and two of the Poloidal Field circuits. The circuit for the Coaxial Helicity Injection (CHI) System had to be carefully developed to meet this special application. Additional Protection devices were designed and installed for the magnet coils and the CHI. The thrust was to making the changes in the most cost-effective manner without compromising technical requirements. This paper describes the changes and addition to the Electrical Power System components for the NSTX magnet systems.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... processing plant or storage location, as evidenced by skeletal construction that accommodates harvest... mechanism used to stop, or hold a vehicle stationary. Brake power assist unit. A device installed in a... force on the service brake control. Brake power unit. A device installed in a brake system that provides...
Code of Federal Regulations, 2011 CFR
2011-10-01
... processing plant or storage location, as evidenced by skeletal construction that accommodates harvest... mechanism used to stop, or hold a vehicle stationary. Brake power assist unit. A device installed in a... force on the service brake control. Brake power unit. A device installed in a brake system that provides...
14 CFR 23.1310 - Power source capacity and distribution.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Power source capacity and distribution. 23... Equipment General § 23.1310 Power source capacity and distribution. (a) Each installation whose functioning... power supply system, distribution system, or other utilization system. (b) In determining compliance...
14 CFR 23.1310 - Power source capacity and distribution.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Power source capacity and distribution. 23... Equipment General § 23.1310 Power source capacity and distribution. (a) Each installation whose functioning... power supply system, distribution system, or other utilization system. (b) In determining compliance...
14 CFR 23.1310 - Power source capacity and distribution.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Power source capacity and distribution. 23... Equipment General § 23.1310 Power source capacity and distribution. (a) Each installation whose functioning... power supply system, distribution system, or other utilization system. (b) In determining compliance...
14 CFR 23.1309 - Equipment, systems, and installations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... compliance with this section with regard to the electrical power system and to equipment design and... the system must be able to supply the following power loads in probable operating combinations and for probable durations: (1) Loads connected to the power distribution system with the system functioning...
A Multi-agent Based Cooperative Voltage and Reactive Power Control
NASA Astrophysics Data System (ADS)
Ishida, Masato; Nagata, Takeshi; Saiki, Hiroshi; Shimada, Ikuhiko; Hatano, Ryousuke
In order to maintain system voltage within the optimal range and prevent voltage instability phenomena before they occur, a variety of phase modifying equipment is installed in optimal locations throughout the power system network and a variety of methods of voltage reactive control are employed. The proposed system divided the traditional method to control voltage and reactive power into two sub problems; “voltage control” to adjust the secondary bus voltage of substations, and “reactive power control” to adjust the primary bus voltage. In this system, two types of agents are installed in substations in order to cooperate “voltage control” and “reactive power control”. In order to verify the performance of the proposed method, it has been applied to the model network system. The results confirm that our proposed method is able to control violent fluctuations in load.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Coddington, M. H.; Kroposki, B. D.; Basso, T.
In 2008, a 300 kW{sub peak} photovoltaic (PV) system was installed on the rooftop of the Colorado Convention Center (CCC). The installation was unique for the electric utility, Xcel Energy, as it had not previously permitted a PV system to be interconnected on a building served by the local secondary network distribution system (network). The PV system was installed with several provisions; one to prevent reverse power flow, another called a dynamically controlled inverter (DCI), that curtails the output of the PV inverters to maintain an amount of load supplied by Xcel Energy at the CCC. The DCI system utilizesmore » current transformers (CTs) to sense power flow to insure that a minimum threshold is maintained from Xcel Energy through the network transformers. The inverters are set to track the load on each of the three phases and curtail power from the PV system when the generated PV system current reaches 95% of the current on any phase. This is achieved by the DCI, which gathers inputs from current transformers measuring the current from the PV array, Xcel, and the spot network load. Preventing reverse power flow is a critical technical requirement for the spot network which serve this part of the CCC. The PV system was designed with the expectation that the DCI system would not curtail the PV system, as the expected minimum load consumption was historically higher than the designed PV system size. However, the DCI system has operated many days during the course of a year, and the performance has been excellent. The DCI system at the CCC was installed as a secondary measure to insure that a minimum level of power flows to the CCC from the Xcel Energy network. While this DCI system was intended for localized control, the system could also reduce output percent if an external smart grid control signal was employed. This paper specifically focuses on the performance of the innovative design at this installation; however, the DCI system could also be used for new s- art grid-enabled distribution systems where renewables power contributions at certain conditions or times may need to be curtailed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hodge, Brian S; Mather, Barry A; Cho, Gyu-Jung
Capacitor banks have been generally installed and utilized to support distribution voltage during period of higher load or on longer, higher impedance, feeders. Installations of distributed energy resources in distribution systems are rapidly increasing, and many of these generation resources have variable and uncertain power output. These generators can significantly change the voltage profile across a feeder, and therefore when a new capacitor bank is needed analysis of optimal capacity and location of the capacitor bank is required. In this paper, we model a particular distribution system including essential equipment. An optimization method is adopted to determine the best capacitymore » and location sets of the newly installed capacitor banks, in the presence of distributed solar power generation. Finally we analyze the optimal capacitor banks configuration through the optimization and simulation results.« less
46 CFR 183.352 - Battery categories.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Battery categories. 183.352 Section 183.352 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.352 Battery categories. This section applies to batteries installed to meet the requirements of § 183.310 for secondary sources of power to...
46 CFR 112.55-10 - Storage battery charging.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Storage battery charging. 112.55-10 Section 112.55-10... AND POWER SYSTEMS Storage Battery Installation § 112.55-10 Storage battery charging. (a) Each storage battery installation for emergency lighting and power, and starting batteries for an emergency diesel or...
46 CFR 129.353 - Battery categories.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Battery categories. 129.353 Section 129.353 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.353 Battery categories. This section applies to batteries installed to meet the requirements of § 129.310(a) for secondary sources of power to vital loads...
Code of Federal Regulations, 2010 CFR
2010-01-01
... PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Emergency Interconnection of Electric Facilities and the Transfer of Electricity to Alleviate An Emergency Shortage of Electric Power § 205.379 Application for approval of the installation of...
46 CFR 112.55-10 - Storage battery charging.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Storage battery charging. 112.55-10 Section 112.55-10... AND POWER SYSTEMS Storage Battery Installation § 112.55-10 Storage battery charging. (a) Each storage battery installation for emergency lighting and power, and starting batteries for an emergency diesel or...
46 CFR 112.55-10 - Storage battery charging.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Storage battery charging. 112.55-10 Section 112.55-10... AND POWER SYSTEMS Storage Battery Installation § 112.55-10 Storage battery charging. (a) Each storage battery installation for emergency lighting and power, and starting batteries for an emergency diesel or...
46 CFR 183.352 - Battery categories.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Battery categories. 183.352 Section 183.352 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.352 Battery categories. This section applies to batteries installed to meet the requirements of § 183.310 for secondary sources of power to...
46 CFR 129.353 - Battery categories.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Battery categories. 129.353 Section 129.353 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.353 Battery categories. This section applies to batteries installed to meet the requirements of § 129.310(a) for secondary sources of power to vital loads...
46 CFR 129.353 - Battery categories.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Battery categories. 129.353 Section 129.353 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.353 Battery categories. This section applies to batteries installed to meet the requirements of § 129.310(a) for secondary sources of power to vital loads...
46 CFR 129.353 - Battery categories.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Battery categories. 129.353 Section 129.353 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.353 Battery categories. This section applies to batteries installed to meet the requirements of § 129.310(a) for secondary sources of power to vital loads...
46 CFR 112.55-10 - Storage battery charging.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Storage battery charging. 112.55-10 Section 112.55-10... AND POWER SYSTEMS Storage Battery Installation § 112.55-10 Storage battery charging. (a) Each storage battery installation for emergency lighting and power, and starting batteries for an emergency diesel or...
46 CFR 112.55-10 - Storage battery charging.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Storage battery charging. 112.55-10 Section 112.55-10... AND POWER SYSTEMS Storage Battery Installation § 112.55-10 Storage battery charging. (a) Each storage battery installation for emergency lighting and power, and starting batteries for an emergency diesel or...
46 CFR 183.352 - Battery categories.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Battery categories. 183.352 Section 183.352 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.352 Battery categories. This section applies to batteries installed to meet the requirements of § 183.310 for secondary sources of power to...
46 CFR 129.353 - Battery categories.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Battery categories. 129.353 Section 129.353 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.353 Battery categories. This section applies to batteries installed to meet the requirements of § 129.310(a) for secondary sources of power to vital loads...
46 CFR 183.352 - Battery categories.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Battery categories. 183.352 Section 183.352 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.352 Battery categories. This section applies to batteries installed to meet the requirements of § 183.310 for secondary sources of power to...
46 CFR 183.352 - Battery categories.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Battery categories. 183.352 Section 183.352 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.352 Battery categories. This section applies to batteries installed to meet the requirements of § 183.310 for secondary sources of power to...
Yakama Nation Renewable Energy Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rigdon, Phillip
2016-05-10
It is the intention of the Yakama Nation to make improvements on the Wapato Irrigation Project (WIP) for the benefit of all stakeholders. Water management, water conservation and water allocation on the Wapato Irrigation Project is equally as important as hydropower. Irrigation will always be the primary purpose of this water system, but the irrigation system can also generate energy. The purpose of this project is the purchase and installation of inflow water turbines to generate an additional one megawatt of hydro-electrical power. The project will occur in two phases, Environmental Assessment and Project Implementation. The core objective for thismore » proposal is to meet the Yakama Nation’s goal in hydroelectric power development. This will include the installation of inflow water turbines on the Wapato Irrigation Project. The Yakama Nation will prepare an Environmental Assessment in preparation to purchase and install new water turbines for hydropower generation of 1 Megawatt. This is a valuable economic development strategy for Yakama Nation that will create new jobs, improve and increase rural electrification, and attract private investments. This water system has an untapped low head/low power potential without the need to construct a new dam. The objective of Phase 1 is to complete an environmental assessment and obtain approval to proceed with installation of the hydroelectric power system.« less
Photovoltaic Power Without Batteries for Continuous Cathodic Protection
NASA Technical Reports Server (NTRS)
Muehl, W. W., Sr.
1993-01-01
The objective of this project was to successfully demonstrate that renewable energy can efficiently and economically replace dedicated non-renewable power sources. The COASTSYSTA designed, installed, and started up on 20 Jan. 1990, a state-of-the-art photovoltaic powered impressed current cathodic protection system (PVCPSYS) for steel and iron submerged structures. This system does not require any auxiliary/battery backup power. The PVCPSYS installed on 775 ft. of steel sheet piling of a Navy bulkhead is continuing to provide complete, continuous corrosion protection. This installation is well documented by COASTSYSTA and was verified on-site by the U.S. Army Corps of Engineers. The PVCPSYS uses only renewable energy and is environmentally clean. A patent is pending on the new technology. Other possible PVCPSYS applications are mothballed ships, docks, dams, locks, bridges, marinas, and pipelines. The Department of Defense Photovoltaic Review Committee and Sandia National Laboratories consider this successful and cost effective system a major advance in the application of photovoltaics.
46 CFR 195.05-1 - Installation and details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Installation and details. 195.05-1 Section 195.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL... Systems. Fire Detecting and Alarm Systems. Sound Powered Telephone and Voice Tube Systems. Engine Order...
46 CFR 195.05-1 - Installation and details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Installation and details. 195.05-1 Section 195.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL... Systems. Fire Detecting and Alarm Systems. Sound Powered Telephone and Voice Tube Systems. Engine Order...
46 CFR 195.05-1 - Installation and details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Installation and details. 195.05-1 Section 195.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL... Systems. Fire Detecting and Alarm Systems. Sound Powered Telephone and Voice Tube Systems. Engine Order...
46 CFR 195.05-1 - Installation and details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Installation and details. 195.05-1 Section 195.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL... Systems. Fire Detecting and Alarm Systems. Sound Powered Telephone and Voice Tube Systems. Engine Order...
A multifunctional energy-storage system with high-power lead-acid batteries
NASA Astrophysics Data System (ADS)
Wagner, R.; Schroeder, M.; Stephanblome, T.; Handschin, E.
A multifunctional energy storage system is presented which is used to improve the utilization of renewable energy supplies. This system includes three different functions: (i) uninterruptible power supply (UPS); (ii) improvement of power quality; (iii) peak-load shaving. The UPS application has a long tradition and is used whenever a reliable power supply is needed. Additionally, nowadays, there is a growing demand for high quality power arising from an increase of system perturbation of electric grids. Peak-load shaving means in this case the use of renewable energy stored in a battery for high peak-load periods. For such a multifunctional application large lead-acid batteries with high power and good charge acceptance, as well as good cycle life are needed. OCSM batteries as with positive tubular plates and negative copper grids have been used successfully for a multitude of utility applications. This paper gives two examples where multifunctional energy storage systems have started operation recently in Germany. One system was installed in combination with a 1 MW solar plant in Herne and another one was installed in combination with a 2 MW wind farm in Bocholt. At each place, a 1.2 MW h (1 h-rate) lead-acid battery has been installed. The batteries consist of OCSM cells with the standard design but modified according to the special demand of a multifunctional application.
Photovoltaic-Powered Vaccine Refrigerator: Freezer Systems Field Test Results
NASA Technical Reports Server (NTRS)
Ratajczak, A. F.
1985-01-01
A project to develop and field test photovoltaic-powered refrigerator/freezers suitable for vaccine storage was undertaken. Three refrigerator/freezers were qualified; one by Solar Power Corp. and two by Solvolt. Follow-on contracts were awarded for 19 field test systems and for 10 field test systems. A total of 29 systems were installed in 24 countries between October 1981 and October 1984. The project, systems descriptions, installation experiences, performance data for the 22 systems for which field test data was reported, an operational reliability summary, and recommendations relative to system designs and future use of such systems are explained. Performance data indicate that the systems are highly reliable and are capable of maintaining proper vaccine storage temperatures in a wide range of climatological and user environments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zvi H. Meiksin
Work has progressed on both subsystems: the Through-the-Earth (TTE) Communications system and the In-Mine Power Line (IMPL) Communications system. The TTE system: The system was fabricated and repackaged as an industrial product enclosed in a commercial rugged, waterproof housing suitable for installation in mines. Features were added to the system to appeal to the preferences of different mine managers. Arrangements were made with NIOSH to install the system in the Lake Lynn underground mine for evaluation and demonstration to potential users. The IMPL system: Voice compression was successfully implemented and incorporated into the laboratory model. Compressed voice was transmitted throughmore » a power line, expanded at the receiving end, and received with high clarity.« less
14 CFR 29.812 - Emergency lighting.
Code of Federal Regulations, 2010 CFR
2010-01-01
... lighting system, they may be recharged from the rotorcraft's main electrical power system provided the... power supply independent of the main lighting system must be installed to— (1) Illuminate each passenger... upon interruption of the rotorcraft's normal electric power. (d) Any means required to assist the...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Design description report for a photovoltaic power system for a remote satellite earth terminal
NASA Technical Reports Server (NTRS)
Marshall, N. A.; Naff, G. J.
1987-01-01
A photovoltaic (PV) power system has been installed as an adjunct to an agricultural school at Wawatobi on the large northern island of the Republic of Indonesia. Its purpose is to provide power for a satellite earth station and a classroom. The renewable energy developed supports the video and audio teleconferencing systems as well as the facility at large. The ground station may later be used to provide telephone service. The installation was made in support of the Agency for International Development's Rural Satellite Program, whose purpose is to demonstrate the use of satellite communications for rural development assistance applications. The objective of this particular PV power system is to demonstrate the suitability of a hybrid PV engine-generator configuration for remote satellite earth stations.
Automated System Tests High-Power MOSFET's
NASA Technical Reports Server (NTRS)
Huston, Steven W.; Wendt, Isabel O.
1994-01-01
Computer-controlled system tests metal-oxide/semiconductor field-effect transistors (MOSFET's) at high voltages and currents. Measures seven parameters characterizing performance of MOSFET, with view toward obtaining early indication MOSFET defective. Use of test system prior to installation of power MOSFET in high-power circuit saves time and money.
Aircraft Electric Secondary Power
NASA Technical Reports Server (NTRS)
1983-01-01
Technologies resulted to aircraft power systems and aircraft in which all secondary power is supplied electrically are discussed. A high-voltage dc power generating system for fighter aircraft, permanent magnet motors and generators for aircraft, lightweight transformers, and the installation of electric generators on turbine engines are among the topics discussed.
Numerical modelling of series-parallel cooling systems in power plant
NASA Astrophysics Data System (ADS)
Regucki, Paweł; Lewkowicz, Marek; Kucięba, Małgorzata
2017-11-01
The paper presents a mathematical model allowing one to study series-parallel hydraulic systems like, e.g., the cooling system of a power boiler's auxiliary devices or a closed cooling system including condensers and cooling towers. The analytical approach is based on a set of non-linear algebraic equations solved using numerical techniques. As a result of the iterative process, a set of volumetric flow rates of water through all the branches of the investigated hydraulic system is obtained. The calculations indicate the influence of changes in the pipeline's geometrical parameters on the total cooling water flow rate in the analysed installation. Such an approach makes it possible to analyse different variants of the modernization of the studied systems, as well as allowing for the indication of its critical elements. Basing on these results, an investor can choose the optimal variant of the reconstruction of the installation from the economic point of view. As examples of such a calculation, two hydraulic installations are described. One is a boiler auxiliary cooling installation including two screw ash coolers. The other is a closed cooling system consisting of cooling towers and condensers.
14 CFR 171.9 - Installation requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... licensing requirements. (b) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated, with a supplemental standby system, if needed. (c...
14 CFR 171.9 - Installation requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... licensing requirements. (b) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated, with a supplemental standby system, if needed. (c...
14 CFR 171.9 - Installation requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... licensing requirements. (b) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated, with a supplemental standby system, if needed. (c...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Shore power. 183.390 Section 183.390 Shipping COAST...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.390 Shore power. A vessel with an electrical system operating at more than 50 volts, which is provided with a means to connect to shore power...
46 CFR 129.315 - Power sources for OSVs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs. (a) The requirements of... 46 Shipping 4 2014-10-01 2014-10-01 false Power sources for OSVs. 129.315 Section 129.315 Shipping... subpart 111.10 of this chapter. (b) If a generator provides electrical power for any system identified as...
The 40-kw field test power plant modification and development, phase 2
NASA Technical Reports Server (NTRS)
1980-01-01
Progression on the design and development of a 40 KW fuel cell system for on-site installation for providing both thermal and electrical power is reported. Development of the steam reformer fuel processor, power section, inverter, control system, and thermal management and water treatment systems is described.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Shore power. 120.390 Section 120.390 Shipping COAST... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.390 Shore power. A vessel with an electrical system operating at more...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Shore power. 120.390 Section 120.390 Shipping COAST... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.390 Shore power. A vessel with an electrical system operating at more...
DOE/NREL supported wind energy activities in Alaska
DOE Office of Scientific and Technical Information (OSTI.GOV)
Drouilhet, S.
1997-12-01
This paper describes three wind energy projects implemented in Alaska. The first, a sustainable technology energy partnerships (STEP) wind energy deployment project in Kotzebue will install 6 AOC 15/50 wind turbines and connect to the existing village diesel grid, consisting of approximately 1 MW average load. It seeks to develop solutions to the problems of arctic wind energy installations (transport, foundations, erection, operation, and maintenance), to establish a wind turbine test site, and to establish the Kotzebue Electric Association as a training and deployment center for wind/diesel technology in rural Alaska. The second project, a large village medium-penetration wind/diesel system,more » also in Kotzebue, will install a 1-2 MW windfarm, which will supplement the AOC turbines of the STEP project. The program will investigate the impact of medium penetration wind energy on power quality and system stability. The third project, the Alaska high-penetration wind/diesel village power pilot project in Wales will install a high penetration (80-100%) wind/diesel system in a remote Alaskan village. The system will include about 180 kW installed wind capacity, meeting an average village load of about 60 kW. This program will provide a model for high penetration wind retrofits to village diesel power systems and build the capability in Alaska to operate, maintain, and replicate wind/diesel technology. The program will also address problems of: effective use of excess wind energy; reliable diesel-off operation; and the role of energy storage.« less
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Assessment of distributed solar power systems: Issues and impacts
NASA Astrophysics Data System (ADS)
Moyle, R. A.; Chernoff, H.; Schweizer, T. C.; Patton, J. B.
1982-11-01
The installation of distributed solar-power systems presents electric utilities with a host of questions. Some of the technical and economic impacts of these systems are discussed. Among the technical interconnect issues are isolated operation, power quality, line safety, and metering options. Economic issues include user purchase criteria, structures and installation costs, marketing and product distribution costs, and interconnect costs. An interactive computer program that allows easy calculation of allowable system prices and allowable generation-equipment prices was developed as part of this project. It is concluded that the technical problems raised by distributed solar systems are surmountable, but their resolution may be costly. The stringent purchase criteria likely to be imposed by many potential system users and the economies of large-scale systems make small systems (less than 10 to 20 kW) less attractive than larger systems. Utilities that consider life-cycle costs in making investment decisions and third-party investors who have tax and financial advantages are likely to place the highest value on solar-power systems.
46 CFR 195.05-1 - Installation and details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL... of this type include the following: Ship's Service Generating Systems. Ship's Service Power... Lighting and Power Systems. Electric Lifeboat Winch Systems. Electric Steering Gear and Steering Control...
Devices and methods for managing noncombustible gasses in nuclear power plants
Marquino, Wayne; Moen, Stephan C; Wachowiak, Richard M; Gels, John L; Diaz-Quiroz, Jesus; Burns, Jr., John C
2014-12-23
Systems passively eliminate noncondensable gasses from facilities susceptible to damage from combustion of built-up noncondensable gasses, such as H2 and O2 in nuclear power plants, without the need for external power and/or moving parts. Systems include catalyst plates installed in a lower header of the Passive Containment Cooling System (PCCS) condenser, a catalyst packing member, and/or a catalyst coating on an interior surface of a condensation tube of the PCCS condenser or an annular outlet of the PCCS condenser. Structures may have surfaces or hydrophobic elements that inhibit water formation and promote contact with the noncondensable gas. Noncondensable gasses in a nuclear power plant are eliminated by installing and using the systems individually or in combination. An operating pressure of the PCCS condenser may be increased to facilitate recombination of noncondensable gasses therein.
Devices and methods for managing noncondensable gasses in nuclear power plants
Marquino, Wayne; Moen, Stephan C.; Wachowiak, Richard M.; Gels, John L.; Diaz-Quiroz, Jesus; Burns, Jr., John C.
2016-11-15
Systems passively eliminate noncondensable gasses from facilities susceptible to damage from combustion of built-up noncondensable gasses, such as H2 and O2 in nuclear power plants, without the need for external power and/or moving parts. Systems include catalyst plates installed in a lower header of the Passive Containment Cooling System (PCCS) condenser, a catalyst packing member, and/or a catalyst coating on an interior surface of a condensation tube of the PCCS condenser or an annular outlet of the PCCS condenser. Structures may have surfaces or hydrophobic elements that inhibit water formation and promote contact with the noncondensable gas. Noncondensable gasses in a nuclear power plant are eliminated by installing and using the systems individually or in combination. An operating pressure of the PCCS condenser may be increased to facilitate recombination of noncondensable gasses therein.
Design and implementation of a 38 kW dish-Stirling concentrated solar power system
NASA Astrophysics Data System (ADS)
Yan, J.; Peng, Y. D.; Cheng, Z. R.; Liu, F. M.; Tang, X. H.
2017-11-01
Dish-Stirling concentrated solar power system (DS-CSP) is an important pathway for converting solar energy into electricity at high efficiency. In this study, a rated power 38 kW DS-CSP system was developed (installed in Xiangtan Electric Manufacturing Group). The heat engine adopted the alpha-type four cylinders double-acting Stirling engine (Stirling Biopower Flexgen S260). The absorber flux distribution simulation was conducted using ray tracing method and then the 204 m2 parabolic dish concentrator system (diameter is 17.70 m and focal length is 9.49 m) with single concentrator plus single pillar supporting has been designed and built. A water-cooled disc target and an absorber imitation device were adopted to test the tracking performance of the dish concentrator system, homogeneity of the focal spot and flux distribution of the absorber. Finally, the S260 Stirling engine was installed on the focal position of the dish concentrator and then the net output power date of the 38 kW DS-CSP system was tested. The absorber overheating problem on the DS-CSP system performance was discussed when the DS-CSP system was installed in different locations. The testing result shows that this system achieved the net output power of 38 kW and solar-to-electricity efficiency (SEE) of 25.3% with the direct normal irradiation (DNI) at 750 W/m2. The net output power can further increase to 40.5 kW with the SEE of 26.6% when the DNI reaches up to the maximum of 761 W/m2. The net output power of the 38 kW DS-CSP system has a linear function relationship with the DNI. The fitting function is Net power output=0.1003×DNI-36.129, where DNI is at the range of 460∼761 W/m2. This function could be used to predict the amount of the 38 kW DS-CSP system annual generation power.
7 CFR 3560.53 - Eligible use of funds.
Code of Federal Regulations, 2011 CFR
2011-01-01
... of the site immediately prior to purchase. (e) Develop and install necessary systems. Funds may be used to install streets, a water supply, sewage disposal, heating and cooling systems, electric, gas, solar, or other power sources for lighting and other features necessary for the housing. If such...
7 CFR 3560.53 - Eligible use of funds.
Code of Federal Regulations, 2014 CFR
2014-01-01
... of the site immediately prior to purchase. (e) Develop and install necessary systems. Funds may be used to install streets, a water supply, sewage disposal, heating and cooling systems, electric, gas, solar, or other power sources for lighting and other features necessary for the housing. If such...
7 CFR 3560.53 - Eligible use of funds.
Code of Federal Regulations, 2013 CFR
2013-01-01
... of the site immediately prior to purchase. (e) Develop and install necessary systems. Funds may be used to install streets, a water supply, sewage disposal, heating and cooling systems, electric, gas, solar, or other power sources for lighting and other features necessary for the housing. If such...
7 CFR 3560.53 - Eligible use of funds.
Code of Federal Regulations, 2012 CFR
2012-01-01
... of the site immediately prior to purchase. (e) Develop and install necessary systems. Funds may be used to install streets, a water supply, sewage disposal, heating and cooling systems, electric, gas, solar, or other power sources for lighting and other features necessary for the housing. If such...
Photovoltaic power without batteries for continuous cathodic protection
NASA Technical Reports Server (NTRS)
Muehl, W. W., Sr.
1994-01-01
The COASTSYSTA designed, installed, and started up on 20 Jan. 1990, a state-of-the-art stand alone photovoltaic powered impressed current cathodic protection system (PVCPSYS) not requiring any auxiliary/battery backup power for steel and iron submerged structures. The PVCPSYS installed on 775' of steel sheet piling of a Navy bulkhead is continuing to provide complete, continuous corrosion protection. This has been well documented by COASTSYSTA and verified on-site by the U.S. Army Civil Engineering Research Laboratory, Champaign, Illinois and the Navy Energy Program Office-Photovoltaic Programs, China Lake, California. The Department of Defense (DoD) Photovoltaic Review Committee and Sandia National Laboratories consider this successful and cost effective system a major advance in the application of photovoltaic power. The PVCPSYS uses only renewable energy and is environmentally clean. A patent is pending on the new technology. Other possible PVCPSYS applications are mothballed ships, docks, dams, locks, bridges, marinas, offshore structures, and pipelines. The initial cost savings by installing a PVCPSYS vs. a conventional CP system was in excess of $46,000.00.
Photovoltaic power without batteries for continuous cathodic protection
NASA Astrophysics Data System (ADS)
Muehl, W. W., Sr.
1994-02-01
The COASTSYSTA designed, installed, and started up on 20 Jan. 1990, a state-of-the-art stand alone photovoltaic powered impressed current cathodic protection system (PVCPSYS) not requiring any auxiliary/battery backup power for steel and iron submerged structures. The PVCPSYS installed on 775' of steel sheet piling of a Navy bulkhead is continuing to provide complete, continuous corrosion protection. This has been well documented by COASTSYSTA and verified on-site by the U.S. Army Civil Engineering Research Laboratory, Champaign, Illinois and the Navy Energy Program Office-Photovoltaic Programs, China Lake, California. The Department of Defense (DoD) Photovoltaic Review Committee and Sandia National Laboratories consider this successful and cost effective system a major advance in the application of photovoltaic power. The PVCPSYS uses only renewable energy and is environmentally clean. A patent is pending on the new technology. Other possible PVCPSYS applications are mothballed ships, docks, dams, locks, bridges, marinas, offshore structures, and pipelines. The initial cost savings by installing a PVCPSYS vs. a conventional CP system was in excess of $46,000.00.
Conceptual design study: Cold water pipe systems for self-mounted OTEC powerplants
NASA Astrophysics Data System (ADS)
1981-02-01
The conceptual design and installation aspects of cold water pipes (CWP) systems for shelf mounted OTEC power plants in Puerto Rico and Hawaii are considered. The CWP systems using Fiberglass Reinforced Plastic (FRP) and steel were designed; the FRP, can be controlled by varying the core thickness; and steel is used as a structural material in offshore applications. A marine railway approach was chosen for installation of the CWP. Two methods for pulling the track for the railway down the pipe fairway to its final location are presented. The track is permanently fastened to the sloping seabed with piles installed by a remotely controlled cart that rides on the track itself. Both the marine railway and the shelf mounted platform that houses the OTEC power plant require an anodic or equivalent corrosion protection system.
Design and installation of 3 photovoltaic village power systems in Tunisia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Darkazalli, G.; Rangaraian, A.; Scudder, L.
1982-09-01
A joint program sponsored by the United States Agency for International Development (U.S.A.I.D.) and the government of Tunisia was initiated to study the feasibility of using photovoltaics to supply electricity to remote villages in Tunisia. U.S.A.I.D. selected the NASA Lewis Research Center to implement the installation of three photovoltaic systems in the Tunisian village of Hammam Biadha Sud. In a competitive procurement, NASA selected a team proposed by the Solar Power Corporation, TriSolar Corporation, Esso Standard Tunisie and Development Sciences, Inc. to design and install the systems and train the villagers in the use of photovoltaics. The Tunisian Government counterpartmore » to NASA, is STEG, the Tunisian electrical generation authority. An overview of the systems designs is presented in this paper.« less
Electricity Submetering on the Cheap: Stick-on Electricity Meters
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lanzisera, Steven; Lorek, Michael; Pister, Kristofer
2014-08-17
We demonstrate a low-cost, 21 x 12 mm prototype Stick-on Electricity Meter (SEM) to replace traditional in-circuit-breaker-panel current and voltage sensors for building submetering. A SEM sensor is installed on the external face of a circuit breaker to generate voltage and current signals. This allows for the computation of real and apparent power as well as capturing harmonics created by non-linear loads. The prototype sensor is built using commercially available components, resulting in a production cost of under $10 per SEM. With no highvoltage install work requiring an electrician, home owners or other individuals can install the system in amore » few minutes with no safety implications. This leads to an installed system cost that is much lower than traditional submetering technology.. Measurement results from lab characterization as well as a real-world residential dwelling installation are presented, verifying the operation of our proposed SEM sensor. The SEM sensor can resolve breaker power levels below 10W, and it can be used to provide data for non-intrusive load monitoring systems at full sample rate.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ginn, J.W.
1995-11-01
The photovoltaic systems test facility at Sandia National Laboratories is evaluating the performance of large hybrid power-processing centers (PPC`s). The primary customer for this work has been the Strategic Environmental Research and Development Program (SERDP) of the Department of Defense. One of the goals of SERDP is to develop power-processing hardware to be used in photovoltaic-hybrid power systems at remote military installations. Power for these installations is presently provided by engine-generators. Currently, hardware for twelve such sites is in various stages of procurement. The subject of this talk is testing of the PPC for the first SERDP system, a 300-kWmore » unit for Superior Valley, a US Navy site at China Lake, California.« less
NASA Astrophysics Data System (ADS)
Stern, M.; West, R.; Fourer, G.; Whalen, W.; Van Loo, M.; Duran, G.
1997-02-01
Utility Power Group has achieved a significant reduction in the installed cost of grid-connected PV systems. The two part technical approach focused on 1) The utilization of a large area factory assembled PV panel, and 2) The integration and packaging of all sub-array power conversion and control functions within a single factory produced enclosure. Eight engineering prototype 15kW ac single axis solar tracking sub-arrays were designed, fabricated, and installed at the Sacramento Municipal Utility District's Hedge Substation site in 1996 and are being evaluated for performance and reliability. A number of design enhancements will be implemented in 1997 and demonstrated by the field deployment and operation of over twenty advanced sub-array PV power systems.
14 CFR Appendix I to Part 25 - Installation of an Automatic Takeoff Thrust Control System (ATTCS)
Code of Federal Regulations, 2011 CFR
2011-01-01
... Appendix I to Part 25—Installation of an Automatic Takeoff Thrust Control System (ATTCS) I25.1General. (a... crew to increase thrust or power. I25.2Definitions. (a) Automatic Takeoff Thrust Control System (ATTCS... Control System (ATTCS) I Appendix I to Part 25 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This inventory of small industrial electric generating systems was assembled by The Aerospace Corporation to provide a data base for analyses being conducted to estimate the potential for displacement of these fossil-fueled systems by solar thermal electric systems no larger than 10 MW in rated capacity. The approximately 2100 megawatts generating capacity of systems in this category constitutes a potential market for small solar thermal and other solar electric power systems. The sources of data for this inventory were the (former) Federal Power Commission (FPC) Form 4 Industrial Ledger and Form 12-C Ledger for 1976. Table 1 alphabetically lists generatingmore » systems located at industrial plants and at Federal government installations in each of the 50 states. These systems are differentiated by type of power plant: steam turbine, diesel generator, or gas turbine. Each listing is designated as a power system rather than a power unit because the FPC Ledgers do not provide a means of determining whether more than one unit is associated with each industrial installation. Hence, the user should consider each listing to be a system capacity rating wherein the system may consist of one or more generating units with less than 10 MW/sub e/ combined rating. (WHK)« less
You're a What? Solar Photovoltaic Installer
ERIC Educational Resources Information Center
Torpey, Elka Maria
2009-01-01
This article talks about solar photovoltaic (PV) installer and features Rebekah Hren, a solar PV installer who puts solar panels on roofs and in other sunny places to turn the sun's power into electricity. Hren enjoys promoting renewable energy, in part because it's an emerging field. In solar PV systems, solar cells--devices that convert sunlight…
Stabilization of gas turbine unit power
NASA Astrophysics Data System (ADS)
Dolotovskii, I.; Larin, E.
2017-11-01
We propose a new cycle air preparation unit which helps increasing energy power of gas turbine units (GTU) operating as a part of combined cycle gas turbine (CCGT) units of thermal power stations and energy and water supply systems of industrial enterprises as well as reducing power loss of gas turbine engines of process blowers resulting from variable ambient air temperatures. Installation of GTU power stabilizer at CCGT unit with electric and thermal power of 192 and 163 MW, respectively, has resulted in reduction of produced electrical energy production costs by 2.4% and thermal energy production costs by 1.6% while capital expenditures after installation of this equipment increased insignificantly.
Grid-connected distributed solar power systems
NASA Astrophysics Data System (ADS)
Moyle, R.; Chernoff, H.; Schweizer, T.
This paper discusses some important, though often ignored, technical and economic issues of distributed solar power systems: protection of the utility system and nonsolar customers requires suitable interfaced equipment. Purchase criteria must mirror reality; most analyses use life-cycle costing with low discount rates - most buyers use short payback periods. Distributing, installing, and marketing small, distributed solar systems is more costly than most analyses estimate. Results show that certain local conditions and uncommon purchase considerations can combine to make small, distributed solar power attractive, but lower interconnect costs (per kW), lower marketing and product distribution costs, and more favorable purchase criteria make large, centralized solar energy more attractive. Specifically, the value of dispersed solar systems to investors and utilities can be higher than $2000/kw. However, typical residential owners place a value of well under $1000 on the installed system.
Results of the harmonics measurement program at the John F. Long photovoltaic house
NASA Astrophysics Data System (ADS)
Campen, G. L.
1982-03-01
Photovoltaic (PV) systems used in single-family dwellings require an inverter to act as an interface between the direct-current (dc) power output of the PV unit and the alternating-current (ac) power needed by house loads. A type of inverter known as line commutated injects harmonic currents on the ac side and requires large amounts of reactive power. Large numbers of such PV installations could lead to unacceptable levels of harmonic voltages on the utility system, and the need to increase the utility's deliver of reactive power could result in significant cost increases. The harmonics and power-factor effects are examined for a single PV installation using a line-commutated inverter. The magnitude and phase of various currents and voltages from the fundamental to the 13th harmonic were recorded both with and without the operation of the PV system.
46 CFR 129.315 - Power sources for OSVs of 100 or more gross tons.
Code of Federal Regulations, 2013 CFR
2013-10-01
... VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs... 46 Shipping 4 2013-10-01 2013-10-01 false Power sources for OSVs of 100 or more gross tons. 129....10 of this chapter. (b) If a generator provides electrical power for any system identified as a vital...
46 CFR 129.315 - Power sources for OSVs of 100 or more gross tons.
Code of Federal Regulations, 2011 CFR
2011-10-01
... VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs... 46 Shipping 4 2011-10-01 2011-10-01 false Power sources for OSVs of 100 or more gross tons. 129....10 of this chapter. (b) If a generator provides electrical power for any system identified as a vital...
46 CFR 129.315 - Power sources for OSVs of 100 or more gross tons.
Code of Federal Regulations, 2012 CFR
2012-10-01
... VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs... 46 Shipping 4 2012-10-01 2012-10-01 false Power sources for OSVs of 100 or more gross tons. 129....10 of this chapter. (b) If a generator provides electrical power for any system identified as a vital...
Status of FEP encapsulated solar cell modules used in terrestrial applications
NASA Technical Reports Server (NTRS)
Ratajczak, A. F.; Forestieri, A. F.
1974-01-01
The Lewis Research Center has been engaged in transferring the FEP encapsulated solar cell technology developed for the space program to terrestrial applications. FEP encapsulated solar cell modules and arrays were designed and built expressly for terrestrial applications. Solar cell power systems were installed at three different land sites, while individual modules are undergoing marine environment tests. Four additional power systems are being completed for installation during the summer of 1974. These tests have revealed some minor problems which have been corrected. The results confirm the inherent utility of FEP encapsulated terrestrial solar cell systems.
NASA Technical Reports Server (NTRS)
Bloomfield, Harvey S.; Heller, Jack A.
1987-01-01
A preliminary feasibility assessment of the integration of reactor power system concepts with a projected growth space station architecture was conducted to address a variety of installation, operational disposition, and safety issues. A previous NASA sponsored study, which showed the advantages of space station - attached concepts, served as the basis for this study. A study methodology was defined and implemented to assess compatible combinations of reactor power installation concepts, disposal destinations, and propulsion methods. Three installation concepts that met a set of integration criteria were characterized from a configuration and operational viewpoint, with end-of-life disposal mass identified. Disposal destinations that met current aerospace nuclear safety criteria were identified and characterized from an operational and energy requirements viewpoint, with delta-V energy requirement as a key parameter. Chemical propulsion methods that met current and near-term application criteria were identified and payload mass and delta-V capabilities were characterized. These capabilities were matched against concept disposal mass and destination delta-V requirements to provide the feasibility of each combination.
HTS Transmission Cable System for installation in the Long Island Power Grid
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schmidt, Frank; Durand, Fabien; Maguire, James
2015-10-05
Department of Energy (DOE) Award DE-FC26-07NT43240 was issued on October 1, 2007. Referred to as LIPA2, the principal objectives of the project were to develop key components required to deploy and demonstrate second-generation (2G) high temperature superconductor (HTS) cables in a 600 meter (2000 feet) underground segment of a 138kV three-phase transmission circuit of the Long Island Power Authority (LIPA) power grid. A previous effort under DOE Award DE-FC36-03GO13032 (referred to as LIPA1) resulted in installation (and subsequent successful operation) of first-generation (1G) HTS cables at the LIPA site. As with LIPA1, American Superconductor (AMSC) led the effort for LIPA2more » and was responsible for overall management of the project and producing sufficient 2G wire to fabricate the required cable. Nexans' tasks included design/manufacture/installation of the cable, joint (splice), cable terminations and field repairable cryostat; while work by Air Liquide involved engineering and installation support for the refrigeration system modifications.« less
Power System Observation by using Synchronized Phasor Measurements as a Smart Device
NASA Astrophysics Data System (ADS)
Mitani, Yasunori
Phasor Measurement Unit (PMU) is an apparatus which detects the absolute value of phase angle in sinusoidal signal. When more than two units are located distantly apart from each other, and they are synchronized with GPS signal which tells us the information on exact time, it becomes ready to get phase differences between two distant places. Thus, PMU with GPS receiver is applied to the monitoring of AC power system dynamics and usually installed at substations of transmission lines. The states of power network are uniquely determined by the active and reactive power and the magnitude and phase angle of voltage in each node. Among these values the phase angle had not been easily obtained until the scheme of time synchronism with GPS appeared. In this report, the history of GPS and PMU, and the current status of the applications in power systems in the world are presented. In Japan we are developing a power system monitoring system with PMUs installed at University's campuses with 100V outlets, which is called Campus WAMS. This report also introduces some results from the Campus WAMS briefly.
System design optimization for stand-alone photovoltaic systems sizing by using superstructure model
NASA Astrophysics Data System (ADS)
Azau, M. A. M.; Jaafar, S.; Samsudin, K.
2013-06-01
Although the photovoltaic (PV) systems have been increasingly installed as an alternative and renewable green power generation, the initial set up cost, maintenance cost and equipment mismatch are some of the key issues that slows down the installation in small household. This paper presents the design optimization of stand-alone photovoltaic systems using superstructure model where all possible types of technology of the equipment are captured and life cycle cost analysis is formulated as a mixed integer programming (MIP). A model for investment planning of power generation and long-term decision model are developed in order to help the system engineer to build a cost effective system.
30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.
Code of Federal Regulations, 2010 CFR
2010-07-01
... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...
30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.
Code of Federal Regulations, 2011 CFR
2011-07-01
... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...
30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.
Code of Federal Regulations, 2014 CFR
2014-07-01
... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...
30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.
Code of Federal Regulations, 2012 CFR
2012-07-01
... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...
30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.
Code of Federal Regulations, 2013 CFR
2013-07-01
... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...
46 CFR 129.326 - Dual-voltage generators.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Dual-voltage generators. 129.326 Section 129.326... INSTALLATIONS Power Sources and Distribution Systems § 129.326 Dual-voltage generators. If a dual-voltage generator is installed on an OSV— (a) The neutral of the dual-voltage system must be solidly grounded at the...
Composite rotor blades for large wind energy installations
NASA Technical Reports Server (NTRS)
Kussmann, A.; Molly, J.; Muser, D.
1980-01-01
The design of large wind power systems in Germany is reviewed with attention given to elaboration of the total wind energy system, aerodynamic design of the rotor blade, and wind loading effects. Particular consideration is given to the development of composite glass fiber/plastic or carbon fiber/plastic rotor blades for such installations.
Contribution of concentrator photovoltaic installations to grid stability and power quality
NASA Astrophysics Data System (ADS)
del Toro García, Xavier; Roncero-Sánchez, Pedro; Torres, Alfonso Parreño; Vázquez, Javier
2012-10-01
Large-scale integration of Photovoltaic (PV) generation systems, including Concentrator Photovoltaic (CPV) technologies, will require the contribution and support of these technologies to the management and stability of the grid. New regulations and grid codes for PV installations in countries such as Spain have recently included dynamic voltage control support during faults. The PV installation must stay connected to the grid during voltage dips and inject reactive power in order to enhance the stability of the system. The existing PV inverter technologies based on the Voltage-Source Converter (VSC) are in general well suited to provide advanced grid-support characteristics. Nevertheless, new advanced control schemes and monitoring techniques will be necessary to meet the most demanding requirements.
14 CFR 25.904 - Automatic takeoff thrust control system (ATTCS).
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Automatic takeoff thrust control system... Automatic takeoff thrust control system (ATTCS). Each applicant seeking approval for installation of an engine power control system that automatically resets the power or thrust on the operating engine(s) when...
14 CFR 25.904 - Automatic takeoff thrust control system (ATTCS).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Automatic takeoff thrust control system... Automatic takeoff thrust control system (ATTCS). Each applicant seeking approval for installation of an engine power control system that automatically resets the power or thrust on the operating engine(s) when...
46 CFR 183.376 - Grounded distribution systems (neutral grounded).
Code of Federal Regulations, 2013 CFR
2013-10-01
... VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.376... propulsion, power, lighting, or distribution system having a neutral bus or conductor must have the neutral... 46 Shipping 7 2013-10-01 2013-10-01 false Grounded distribution systems (neutral grounded). 183...
Energy storage and alternatives to improve train voltage on a mass transit system
NASA Astrophysics Data System (ADS)
Gordon, S. P.; Rorke, W. S.
1995-04-01
The wide separation of substations in the Bay Area Rapid Transit system's transbay tunnel contributes to voltage sag when power demand is high. In the future, expansions to the system will exacerbate this problem by increasing traffic density. Typically, this situation is remedied through the installation of additional substations to increase the system's power capacity. We have evaluated the efficacy of several alternatives to this approach - specifically, installation of an 8 megajoule energy storage system, modification of the existing substations, or reduction of the resistance of the running rails or the third rail. To support this analysis, we have developed a simple model of the traction power system in the tunnel. We have concluded that the storage system does not have sufficient capacity to deal with the expected voltage sags; in this application, the alternatives present more effective solutions. We have also investigated the potential impact of these system upgrades on expected future capital outlays by BART for traction power infrastructure additions. We have found that rail or substation upgrades may reduce the need for additional substations. These upgrades may also be effective on other parts of the BART system and on other traction power systems.
A peaking-regulation-balance-based method for wind & PV power integrated accommodation
NASA Astrophysics Data System (ADS)
Zhang, Jinfang; Li, Nan; Liu, Jun
2018-02-01
Rapid development of China’s new energy in current and future should be focused on cooperation of wind and PV power. Based on the analysis of system peaking balance, combined with the statistical features of wind and PV power output characteristics, a method of comprehensive integrated accommodation analysis of wind and PV power is put forward. By the electric power balance during night peaking load period in typical day, wind power installed capacity is determined firstly; then PV power installed capacity could be figured out by midday peak load hours, which effectively solves the problem of uncertainty when traditional method hard determines the combination of the wind and solar power simultaneously. The simulation results have validated the effectiveness of the proposed method.
NASA Astrophysics Data System (ADS)
Groth, H.
1982-11-01
The utilization of photovoltaic generators in measuring and signalling installations, communication systems, water pumping, and electric power plants is discussed. The advantages of solar generators over conventional power supply equipment are outlined.
High Voltage Power Transmission for Wind Energy
NASA Astrophysics Data System (ADS)
Kim, Young il
The high wind speeds and wide available area at sea have recently increased the interests on offshore wind farms in the U.S.A. As offshore wind farms become larger and are placed further from the shore, the power transmission to the onshore grid becomes a key feature. Power transmission of the offshore wind farm, in which good wind conditions and a larger installation area than an onshore site are available, requires the use of submarine cable systems. Therefore, an underground power cable system requires unique design and installation challenges not found in the overhead power cable environment. This paper presents analysis about the benefit and drawbacks of three different transmission solutions: HVAC, LCC/VSC HVDC in the grid connecting offshore wind farms and also analyzed the electrical characteristics of underground cables. In particular, loss of HV (High Voltage) subsea power of the transmission cables was evaluated by the Brakelmann's theory, taking into account the distributions of current and temperature.
2003-03-04
Aerovironment technicians carefully line up attachments as a fuel cell electrical system is installed on the Helios Prototype solar powered flying wing. The fuel cell system will power the aircraft at night during NASA-sponsored long-endurance demonstration flight in the summer of 2003.
NASA Astrophysics Data System (ADS)
Mulyadi, Y.; Sucita, T.; Rahmawan, M. D.
2018-01-01
This study was a case study in PT. PLN (Ltd.) APJ Bandung area with the subject taken was the installation of distributed generation (DG) on 20-kV distribution channels. The purpose of this study is to find out the effect of DG to the changes in voltage profile and three-phase short circuit fault in the 20-kV distribution system with load conditions considered to be balanced. The reason for this research is to know how far DG can improve the voltage profile of the channel and to what degree DG can increase the three-phase short circuit fault on each bus. The method used in this study was comparing the simulation results of power flow and short-circuit fault using ETAP Power System software with manual calculations. The result obtained from the power current simulation before the installation of DG voltage was the drop at the end of the channel at 2.515%. Meanwhile, the three-phase short-circuit current fault before the DG installation at the beginning of the channel was 13.43 kA. After the installation of DG with injection of 50%, DG power obtained voltage drop at the end of the channel was 1.715% and the current fault at the beginning network was 14.05 kA. In addition, with injection of 90%, DG power obtained voltage drop at the end of the channel was 1.06% and the current fault at the beginning network was 14.13%.
NASA Astrophysics Data System (ADS)
Azarbayejani, M.; Jalalpour, M.; El-Osery, A. I.; Reda Taha, M. M.
2011-08-01
In this paper, an innovative field application of a structural health monitoring (SHM) system using field programmable gate array (FPGA) technology and wireless communication is presented. The new SHM system was installed to monitor a reinforced concrete (RC) bridge on Interstate 40 (I-40) in Tucumcari, New Mexico. This newly installed system allows continuous remote monitoring of this bridge using solar power. Details of the SHM component design and installation are discussed. The integration of FPGA and solar power technologies make it possible to remotely monitor infrastructure with limited access to power. Furthermore, the use of FPGA technology enables smart monitoring where data communication takes place on-need (when damage warning signs are met) and on-demand for periodic monitoring of the bridge. Such a system enables a significant cut in communication cost and power demands which are two challenges during SHM operation. Finally, a three-dimensional finite element (FE) model of the bridge was developed and calibrated using a static loading field test. This model is then used for simulating damage occurrence on the bridge. Using the proposed automation process for SHM will reduce human intervention significantly and can save millions of dollars currently spent on prescheduled inspection of critical infrastructure worldwide.
1997-07-18
Jet Propulsion Laboratory (JPL) engineers examine the interface surface on the Cassini spacecraft prior to installation of the third radioisotope thermoelectric generator (RTG). The other two RTGs, at left, already are installed on Cassini. The three RTGs will be used to power Cassini on its mission to the Saturnian system. They are undergoing mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL
NASA Astrophysics Data System (ADS)
Takahashi, K.; Konagai, M.
The fabrication, performance, and applications of a-Si solar cells are discussed, summarizing the results of recent experimental investigations and trial installations. Topics examined include the fundamental principles and design strategies of solar power installations; the characteristics of monocrystalline-Si solar cells; techniques for reducing the cost of solar cells; independent, linked, and hybrid solar power systems; proposed satellite solar power systems; and the use of solar cells in consumer appliances. Consideration is given to the history of a-Si, a-Si fabrication techniques, quality criteria for a-Si films, solar cells based on a-Si, and techniques for increasing the efficiency and lowering the cost of a-Si solar cells. Graphs, diagrams, drawings, and black-and-white and color photographs are provided.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, James; Mileva, Ana; Johnston, Josiah
2014-01-01
This study used a state-of-the-art planning model called SWITCH for the electric power system to investigate the evolution of the power systems of California and western North America from present-day to 2050 in the context of deep decarbonization of the economy. Researchers concluded that drastic power system carbon emission reductions were feasible by 2050 under a wide range of possible futures. The average cost of power in 2050 would range between $149 to $232 per megawatt hour across scenarios, a 21 to 88 percent increase relative to a business-as-usual scenario, and a 38 to 115 percent increase relative to themore » present-day cost of power. The power system would need to undergo sweeping change to rapidly decarbonize. Between present-day and 2030 the evolution of the Western Electricity Coordinating Council power system was dominated by implementing aggressive energy efficiency measures, installing renewable energy and gas-fired generation facilities and retiring coal-fired generation. Deploying wind, solar and geothermal power in the 2040 timeframe reduced power system emissions by displacing gas-fired generation. This trend continued for wind and solar in the 2050 timeframe but was accompanied by large amounts of new storage and long-distance high-voltage transmission capacity. Electricity storage was used primarily to move solar energy from the daytime into the night to charge electric vehicles and meet demand from electrified heating. Transmission capacity over the California border increased by 40 - 220 percent by 2050, implying that transmission siting, permitting, and regional cooperation will become increasingly important. California remained a net electricity importer in all scenarios investigated. Wind and solar power were key elements in power system decarbonization in 2050 if no new nuclear capacity was built. The amount of installed gas capacity remained relatively constant between present-day and 2050, although carbon capture and sequestration was installed on some gas plants by 2050.« less
46 CFR 193.05-10 - Fixed fire extinguishing systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
....05-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH... combustion engine installations; (2) Gas turbine installations; (3) Enclosed spaces containing gasoline engines; (4) Chemical storerooms; (5) Any space containing auxiliaries with an aggregate power of 1,000...
46 CFR 193.05-10 - Fixed fire extinguishing systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
....05-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH... combustion engine installations; (2) Gas turbine installations; (3) Enclosed spaces containing gasoline engines; (4) Chemical storerooms; (5) Any space containing auxiliaries with an aggregate power of 1,000...
46 CFR 193.05-10 - Fixed fire extinguishing systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
....05-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH... combustion engine installations; (2) Gas turbine installations; (3) Enclosed spaces containing gasoline engines; (4) Chemical storerooms; (5) Any space containing auxiliaries with an aggregate power of 1,000...
NASA Technical Reports Server (NTRS)
1978-01-01
A description is given of the Installation, Operation, and Maintenance Manual and information on the power panel and programmable microprocessor, a hydronic solar pump system and a hydronic heating hot water pumping system. These systems are integrated into various configurations for usages in solar energy management, control and monitoring, lighting control, data logging and other solar related applications.
46 CFR 183.310 - Power sources.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Power sources. 183.310 Section 183.310 Shipping COAST...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.310 Power sources. (a)(1) Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be...
46 CFR 183.310 - Power sources.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.310 Power sources. (a)(1) Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be... 46 Shipping 7 2013-10-01 2013-10-01 false Power sources. 183.310 Section 183.310 Shipping COAST...
46 CFR 183.310 - Power sources.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.310 Power sources. (a)(1) Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be... 46 Shipping 7 2012-10-01 2012-10-01 false Power sources. 183.310 Section 183.310 Shipping COAST...
Code of Federal Regulations, 2011 CFR
2011-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.390 Shore power. A vessel with an... at the switchboard or main distribution panel for the shore power connection; and (d) The circuit... 46 Shipping 7 2011-10-01 2011-10-01 false Shore power. 183.390 Section 183.390 Shipping COAST...
Code of Federal Regulations, 2013 CFR
2013-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.390 Shore power. A vessel with an... at the switchboard or main distribution panel for the shore power connection; and (d) The circuit... 46 Shipping 7 2013-10-01 2013-10-01 false Shore power. 183.390 Section 183.390 Shipping COAST...
46 CFR 183.310 - Power sources.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.310 Power sources. (a)(1) Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be... 46 Shipping 7 2014-10-01 2014-10-01 false Power sources. 183.310 Section 183.310 Shipping COAST...
46 CFR 183.310 - Power sources.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.310 Power sources. (a)(1) Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be... 46 Shipping 7 2011-10-01 2011-10-01 false Power sources. 183.310 Section 183.310 Shipping COAST...
Code of Federal Regulations, 2014 CFR
2014-10-01
... at a convenient location; (b) A cable connecting the shore power connection box or receptacle to the... 46 Shipping 7 2014-10-01 2014-10-01 false Shore power. 183.390 Section 183.390 Shipping COAST...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.390 Shore power. A vessel with an...
Code of Federal Regulations, 2012 CFR
2012-10-01
... at a convenient location; (b) A cable connecting the shore power connection box or receptacle to the... 46 Shipping 7 2012-10-01 2012-10-01 false Shore power. 183.390 Section 183.390 Shipping COAST...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.390 Shore power. A vessel with an...
Solar Water Heater Installation Package
NASA Technical Reports Server (NTRS)
1982-01-01
A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.
DOE/NREL supported wind energy activities in Indonesia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Drouilhet, S.
1997-12-01
This paper describes three wind energy related projects which are underway in Indonesia. The first is a USAID/Winrock Wind for Island and Nongovernmental Development (WIND) project. The objectives of this project are to train local nongovernmental organizations (NGOs) in the siting, installation, operation, and maintenance of small wind turbines. Then to install up to 20 wind systems to provide electric power for productive end uses while creating micro-enterprises which will generate enough revenue to sustain the wind energy systems. The second project is a joint Community Power Corporation/PLN (Indonesian National Electric Utility) case study of hybrid power systems in villagemore » settings. The objective is to evaluate the economic viability of various hybrid power options for several different situations involving wind/photovoltaics/batteries/diesel. The third project is a World Bank/PLN preliminary market assessment for wind/diesel hybrid systems. The objective is to estimate the size of the total potential market for wind/diesel hybrid power systems in Indonesia. The study will examine both wind retrofits to existing diesel mini-grids and new wind-diesel plants in currently unelectrified villages.« less
46 CFR 183.322 - Multiple generators.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.322 Multiple generators. When a vessel is equipped with two or more generators to supply ship's service power, the following requirements...
46 CFR 183.322 - Multiple generators.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.322 Multiple generators. When a vessel is equipped with two or more generators to supply ship's service power, the following requirements...
46 CFR 183.322 - Multiple generators.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.322 Multiple generators. When a vessel is equipped with two or more generators to supply ship's service power, the following requirements...
46 CFR 183.322 - Multiple generators.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.322 Multiple generators. When a vessel is equipped with two or more generators to supply ship's service power, the following requirements...
46 CFR 183.322 - Multiple generators.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.322 Multiple generators. When a vessel is equipped with two or more generators to supply ship's service power, the following requirements...
1997-07-18
Jet Propulsion Laboratory (JPL) workers carefully roll into place a platform with a second radioisotope thermoelectric generator (RTG) for installation on the Cassini spacecraft. In background at left, the first of three RTGs already has been installed on Cassini. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. The power units are undergoing mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL
Installation of a Roof Mounted Photovoltaic System
NASA Astrophysics Data System (ADS)
Lam, M.
2015-12-01
In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.
WORKING PARK-FUEL CELL COMBINED HEAT AND POWER SYSTEM
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allan Jones
2003-09-01
This report covers the aims and objectives of the project which was to design, install and operate a fuel cell combined heat and power (CHP) system in Woking Park, the first fuel cell CHP system in the United Kingdom. The report also covers the benefits that were expected to accrue from the work in an understanding of the full technology procurement process (including planning, design, installation, operation and maintenance), the economic and environmental performance in comparison with both conventional UK fuel supply and conventional CHP and the commercial viability of fuel cell CHP energy supply in the new deregulated energymore » markets.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mousavian, Seyedamirabbas; Valenzuela, Jorge; Wang, Jianhui
2015-02-01
Ensuring the reliability of an electrical power system requires a wide-area monitoring and full observability of the state variables. Phasor measurement units (PMUs) collect in real time synchronized phasors of voltages and currents which are used for the observability of the power grid. Due to the considerable cost of installing PMUs, it is not possible to equip all buses with PMUs. In this paper, we propose an integer linear programming model to determine the optimal PMU placement plan in two investment phases. In the first phase, PMUs are installed to achieve full observability of the power grid whereas additional PMUsmore » are installed in the second phase to guarantee the N - 1 observability of the power grid. The proposed model also accounts for transmission switching and single contingencies such as failure of a PMU or a transmission line. Results are provided on several IEEE test systems which show that our proposed approach is a promising enhancement to the methods available for the optimal placement of PMUs.« less
Hybrid Configuration of Darrieus and Savonius Rotors for Stand-alone Power Systems
NASA Astrophysics Data System (ADS)
Wakui, Tetsuya; Tanzawa, Yoshiaki; Hashizume, Takumi; Nagao, Toshio
The suitable hybrid configuration of Darrieus lift-type and Savonius drag-type rotors for stand-alone wind turbine-generator systems is discussed using our dynamic simulation model. Two types of hybrid configurations are taken up: Type-A installs the Savonius rotor inside the Darrieus rotor and Type-B installs the Savonius rotor outside the Darrieus rotor. The computed results of the output characteristics and the dynamic behaviors of the system operated at the maximum power coefficient points show that Type-A, which has fine operating behavior to wind speed changes and can be compactly designed because of a shorter rotational shaft, is an effective way for self-controlled stand-alone small-scale systems.
Feasibility study of a 270V dc flat cable aircraft electrical power distributed system
NASA Astrophysics Data System (ADS)
Musga, M. J.; Rinehart, R. J.
1982-01-01
This report documents the efforts of a one man-year feasibility study to evaluate the usage of flat conductors in place of conventional round wires for a 270 volt direct current aircraft power distribution system. This study consisted of designing electrically equivalent power distribution harnesses in flat conductor configurations for a currently operational military aircraft. Harness designs were established for installation in aircraft airframes which are: (1) All metal, or (2) All composite, or (3) a mixture of both. Flat cables have greater surface areas for heat transfer allowing higher current densities and therefore lighter weight conductors, than with round wires. Flat cables are less susceptible to electromagnetic effects. However, these positive factors are partially offset by installation and maintenance difficulties. This study concludes that the extent of these difficulties can be adequately limited with appropriate modification to present installation and maintenance practices. A comparative analysis of the flat and the round conductor power distribution harnesses was made for weight, cost, maintenance and reliability. The knowledge gained from the design and comparative analysis phases was used to generate design criteria for flat power cable harnesses and to identify and prioritize flat cable harness components and associated production tooling which require development.
EMISSIONS REDUCTION DATA FOR GRID-CONNECTED PHOTOVOLTAIC POWER SYSTEMS
This study measured the pollutant emission reduction potential of 29 photovoltaic (PV) systems installed on residential and commercial building rooftops across the U.S. from 1993 through 1997. The U.S. Environmental Protection Agency (EPA) and 21 electric power companies sponsor...
Research notes : solar powered navigational lighting system demonstration project.
DOT National Transportation Integrated Search
2011-04-01
ODOT will be installing a solar powered navigational lighting system on the AstoriaMegler Bridge as part of a pilot project approved by the Federal Highways Administration (FHWA). The coastal bridge is the connection across the Columbia River on U.S....
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Shaughnessy, Eric; Margolis, Robert
2017-04-01
The vast majority of U.S. residential solar PV installers are small local-scale companies, however the industry is relatively concentrated in a few large national-scale installers. We develop a novel approach using solar PV quote data to study the price behavior of large solar PV installers in the United States. Through a paired differences approach, we find that large installer quotes are about higher, on average, than non-large installer quotes made to the same customer. The difference is statistically significant and robust after controlling for factors such as system size, equipment quality, and time effects. The results suggest that low pricesmore » are not the primary value proposition of large installer systems. We explore several hypotheses for this finding, including that large installers are able to exercise some market power and/or earn returns from reputations.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.312 Power sources on vessels... generator sets; (b) An electrical power system that complies with the requirements of §§ 111.10-4, 111.10-5... 46 Shipping 4 2010-10-01 2010-10-01 false Power sources on vessels of more than 19.8 meters (65...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Power sources on vessels of more than 19.8 meters (65... PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.312 Power sources on vessels... generator sets; (b) An electrical power system that complies with the requirements of §§ 111.10-4, 111.10-5...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Power sources on vessels of more than 19.8 meters (65... PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.312 Power sources on vessels... generator sets; (b) An electrical power system that complies with the requirements of §§ 111.10-4, 111.10-5...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Power sources on vessels of more than 19.8 meters (65... PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.312 Power sources on vessels... generator sets; (b) An electrical power system that complies with the requirements of §§ 111.10-4, 111.10-5...
Using the adsorption chillers for waste heat utilisation from the CCS installation
NASA Astrophysics Data System (ADS)
Sztekler, Karol; Kalawa, Wojciech; Nowak, Wojciech; Stefański, Sebastian; Krzywański, Jarosław; Grabowska, Karolina
2018-06-01
Worldwide tendencies in the scope of environmental protection demonstrate the requirement for the limited carbon dioxide emission, that influences on the development of greenhouse effect. As a result of coal as a basic fuel used in the professional power industry, this industry sector is the greatest CO2 polluter and it means that works on the reduction of carbon dioxide in such industry are completely justified. In the IPSEpro programming environment, a reference block model for a conventional coal power station was elaborated, including the CO2 separation unit basing on the adsorption methods with the CO2 preparation installation to liquid state. Simulation researches were conducted with means of numeric techniques, that enabled the system analysis for the CO2 separation unit with the CO2 preparation system to the liquid state, as well as analysis was made for the use of chiller systems, basing on the adsorption technology for waste heat use originating from the compression of CO2 in a cascade system, as well as for potential opportunities for further exploitation of the produced chilled water in the CCS cycle. We analysed in these papers the opportunities for chiller systems application, based on the adsorption chillers in the CCS installation used for the reduction of CO2 emission in the coal power station and its influence on the operation of a power station cycle.
Control aspects of the Schuchuli Village stand-alone photovoltaic power system
NASA Astrophysics Data System (ADS)
Groumpos, P. P.; Culler, J. E.; Delombard, R.
1984-11-01
A photovoltaic power system in an Arizona Indian village was installed. The control subsystem of this photovoltaic power system was analyzed. The four major functions of the control subsystem are: (1) voltage regulation; (2) load management; (3) water pump control; and (4) system protection. The control subsystem functions flowcharts for the control subsystem operation, and a computer program that models the control subsystem are presented.
Control aspects of the Schuchuli Village stand-alone photovoltaic power system
NASA Technical Reports Server (NTRS)
Groumpos, P. P.; Culler, J. E.; Delombard, R.
1984-01-01
A photovoltaic power system in an Arizona Indian village was installed. The control subsystem of this photovoltaic power system was analyzed. The four major functions of the control subsystem are: (1) voltage regulation; (2) load management; (3) water pump control; and (4) system protection. The control subsystem functions flowcharts for the control subsystem operation, and a computer program that models the control subsystem are presented.
14 CFR 171.49 - Installation requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... power, either from a power distribution system or locally generated. A determination by the Administrator as to whether a facility will be required to have stand-by power for the localizer, glide slope and monitor accessories to supplement the primary power, will be made for each airport based upon...
14 CFR 171.49 - Installation requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... power, either from a power distribution system or locally generated. A determination by the Administrator as to whether a facility will be required to have stand-by power for the localizer, glide slope and monitor accessories to supplement the primary power, will be made for each airport based upon...
14 CFR 171.49 - Installation requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... power, either from a power distribution system or locally generated. A determination by the Administrator as to whether a facility will be required to have stand-by power for the localizer, glide slope and monitor accessories to supplement the primary power, will be made for each airport based upon...
49 CFR 236.516 - Power supply.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Power supply. 236.516 Section 236.516..., Train Control and Cab Signal Systems Standards § 236.516 Power supply. Automatic cab signal, train stop, or train control device hereafter installed shall operate from a separate or isolated power supply...
49 CFR 236.516 - Power supply.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Power supply. 236.516 Section 236.516..., Train Control and Cab Signal Systems Standards § 236.516 Power supply. Automatic cab signal, train stop, or train control device hereafter installed shall operate from a separate or isolated power supply...
NASA Astrophysics Data System (ADS)
Kaldellis, J. K.; Kostas, P.; Filios, A.
2006-07-01
Autonomous wind power systems are among the most interesting and environmentally friendly technological solutions for the electrification of remote consumers. In many cases, however, the battery contribution to the initial or the total operational cost is found to be dominant, discouraging further penetration of the available wind resource. This is basically the case for areas possessing a medium-low wind potential. On the other hand, several isolated consumers are located in regions having the regular benefit of an abundant and reliable solar energy supply. In this context the present study investigates the possibility of reducing the battery size of a stand-alone wind power installation by incorporating a small photovoltaic generator. For this purpose an integrated energy production installation based exclusively on renewable energy resources is hereby proposed. Subsequently a new numerical algorithm is developed that is able to estimate the appropriate dimensions of a similar system. According to the results obtained by long-term experimental measurements, the introduction of the photovoltaic panels considerably improves the operational and financial behaviour of the complete installation owing to the imposed significant battery capacity diminution. Copyright
Case study of a central-station grid-intertie photovoltaic system with V-trough concentration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Freilich, J.; Gordon, J.M.
1991-01-01
This presentation is a cast study of an installed, central-station (no storage), utility-intertie photovoltaic (PV) system in Sede Boqer, Israel (latitude 30.9{degree}N). The nominally 12 kW peak PV system is comprised of 189 polycrystalline silicon modules mounted on inexpensive, one-axis north-south horizontal trackers with V-trough mirrors for optical boost. The power conditioning unit operates at a fixed voltage rather than at maximum power point (MPP). The primary task in analyzing the installed system was to investigate the cause of measured power output significantly below the design predictions of the installers, and to recommend system design modifications. Subsequent tasks included themore » quantitative assessment of fixed-voltage operation and of the energetic value of V-trough concentration and one-axis tracking for this system. Sample results show: (1) fixed-voltage operation at the best fixed voltage (BFV) can achieve around 96% of the yearly energy of MPP operation; (2) the sensitivity of the yearly energy delivery to the selection of fixed voltage and its marked asymmetry about the BFV; (3) the influences of inverter current constraints on yearly energy delivery and BFV; and (4) how the separate effects of tracking and optical concentration increase yearly energy delivery.« less
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS... Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS... Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS... Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
1997-05-27
Jet Propulsion Laboratory (JPL) technicians finish mounting a thermal model of a radioisotope thermoelectric generator (RTG) on the installation cart which will be used to install the RTG in the Cassini spacecraft at Level 14 of Space Launch Complex 40, Cape Canaveral Air Station. The technicians use the thermal model to practice installation procedures. The three actual RTGs which will provide electrical power to Cassini on its 6.7-mile trip to the Saturnian system, and during its four-year mission at Saturn, are being tested and monitored in the Radioisotope Thermoelectric Generator Storage Building in KSC's Industrial Area. The RTGs use heat from the natural decay of plutonium to generate electric power. RTGs enable spacecraft to operate far from the Sun where solar power systems are not feasible. The RTGs on Cassini are of the same design as those flying on the already deployed Galileo and Ulysses spacecraft. The Cassini mission is targeted for an October 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL
A 10kW photovoltaic/hybrid system for Pinnacles National Monument
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ball, T.J.; DeNio, D.
1997-12-31
Visitors to the Chaparral area of the Pinnacles National Monument now can enjoy this beautiful section of the park without the constant drone of diesel generators, thanks to a recently installed photovoltaic/hybrid system. Electrical power had been supplied by two 100 KW diesel generators operating 24 hours per day. The diesels were running lightly loaded resulting in poor efficiency and high operating cost. Applied Power Corporation under contract with the National Park Service designed and supplied a 10 KW photovoltaic array, 200 KW hr battery bank and 24 KW of inverters to power the maintenance facility, visitor center and rangermore » residences. A new 20 KW propane generator was installed to provide supplemental power, totally eliminating the storage and transport of diesel fuel at this site. The Pinnacles PV/Hybrid system was brought on line in early 1996 and the park is now benefiting from the cost savings associated with the system.« less
ERIC Educational Resources Information Center
Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.
THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE DIESEL ENGINE LUBRICATION SYSTEM AND THE PROCEDURES FOR REMOVAL AND INSTALLATION OF THE DRIVE LINE USED IN DIESEL ENGINE POWER DISTRIBUTION. TOPICS ARE (1) PROLONGING ENGINE LIFE, (2) FUNCTIONS OF THE LUBRICATING SYSTEM, (3) TRACING THE LUBRICANT FLOW, (4) DETERMINING…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1977-01-01
The legislation on greater coal utilization before the committee includes S. 272 (requiring, to the extent practicable, electric power plants and major fuel-bearing installations to utilize fuels other than natural gas); S. 273 (requiring, to the extent practicable, new electric power plants and new major fuel-burning installations be constructed to utliize fuels other than natural gas or petroleum); and S. 977 (requiring, to the extent practicable, existing electric power plants and major fuel-burning installations to utilize fuels other than natural gas or petroleum). Statements were heard from seven senators and representatives from the following: American Electric Power Service Corp., Americanmore » Boiler Manufactures Association, National Electric Reliability Council, Virgina Electric and Power Co., Fossil Power Systems, Houston Lighting and Power Co., other electric utility industry representatives, and the Federal Energy Adminstration. Additional material from the Wall Street Journal and the Washington Post is included. (MCW)« less
NASA Technical Reports Server (NTRS)
Delombard, R.
1984-01-01
A photovoltaic power system which will be installed at a remote location in Indonesia to provide power for a satellite Earth station and a classroom for video and audio teleconferences are described. The Earth station may also provide telephone service to a nearby village. The use of satellite communications for development assistance applications and the suitability of a hybrid photovoltaic engine generator power system for remote satellite Earth stations are demonstrated. The Indonesian rural satellite project is discussed and the photovoltaic power system is described.
NASA Astrophysics Data System (ADS)
Erkaya, Yunus
The number of solar photovoltaic (PV) installations is growing exponentially, and to improve the energy yield and the efficiency of PV systems, it is necessary to have correct methods for simulation, measurement, and emulation. PV systems can be simulated using PV models for different configurations and technologies of PV modules. Additionally, different environmental conditions of solar irradiance, temperature, and partial shading can be incorporated in the model to accurately simulate PV systems for any given condition. The electrical measurement of PV systems both prior to and after making electrical connections is important for attaining high efficiency and reliability. Measuring PV modules using a current-voltage (I-V) curve tracer allows the installer to know whether the PV modules are 100% operational. The installed modules can be properly matched to maximize performance. Once installed, the whole system needs to be characterized similarly to detect mismatches, partial shading, or installation damage before energizing the system. This will prevent any reliability issues from the onset and ensure the system efficiency will remain high. A capacitive load is implemented in making I-V curve measurements with the goal of minimizing the curve tracer volume and cost. Additionally, the increase of measurement resolution and accuracy is possible via the use of accurate voltage and current measurement methods and accurate PV models to translate the curves to standard testing conditions. A move from mechanical relays to solid-state MOSFETs improved system reliability while significantly reducing device volume and costs. Finally, emulating PV modules is necessary for testing electrical components of a PV system. PV emulation simplifies and standardizes the tests allowing for different irradiance, temperature and partial shading levels to be easily tested. Proper emulation of PV modules requires an accurate and mathematically simple PV model that incorporates all known system variables so that any PV module can be emulated as the design requires. A non-synchronous buck converter is proposed for the emulation of a single, high-power PV module using traditional silicon devices. With the proof-of-concept working and improvements in efficiency, power density and steady-state errors made, dynamic tests were performed using an inverter connected to the PV emulator. In order to improve the dynamic characteristics, a synchronous buck converter topology is proposed along with the use of advanced GaNFET devices which resulted in very high power efficiency and improved dynamic response characteristics when emulating PV modules.
46 CFR 120.310 - Power sources.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Power sources. 120.310 Section 120.310 Shipping COAST... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.310 Power sources. (a)(1) Each vessel that relies on electricity to...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
46 CFR 120.310 - Power sources.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Power sources. 120.310 Section 120.310 Shipping COAST... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.310 Power sources. (a)(1) Each vessel that relies on electricity to...
33 CFR 164.25 - Tests before entering or getting underway.
Code of Federal Regulations, 2014 CFR
2014-07-01
... emergency lighting and power systems in vessel control and propulsion machinery spaces. (5) Main propulsion...) The main steering gear from the alternative power supply, if installed. (iv) Each rudder angle... power failure alarm. (vi) Each remote steering gear power unit failure alarm. (vii) The full movement of...
33 CFR 164.25 - Tests before entering or getting underway.
Code of Federal Regulations, 2012 CFR
2012-07-01
... emergency lighting and power systems in vessel control and propulsion machinery spaces. (5) Main propulsion...) The main steering gear from the alternative power supply, if installed. (iv) Each rudder angle... power failure alarm. (vi) Each remote steering gear power unit failure alarm. (vii) The full movement of...
Lead/acid batteries in systems to improve power quality
NASA Astrophysics Data System (ADS)
Taylor, P.; Butler, P.; Nerbun, W.
Increasing dependence on computer technology is driving needs for extremely high-quality power to prevent loss of information, material, and workers' time that represent billions of dollars annually. This cost has motivated commercial and Federal research and development of energy storage systems that detect and respond to power-quality failures in milliseconds. Electrochemical batteries are among the storage media under investigation for these systems. Battery energy storage systems that employ either flooded lead/acid or valve-regulated lead/acid battery technologies are becoming commercially available to capture a share of this emerging market. Cooperative research and development between the US Department of Energy and private industry have led to installations of lead/acid-based battery energy storage systems to improve power quality at utility and industrial sites and commercial development of fully integrated, modular battery energy storage system products for power quality. One such system by AC Battery Corporation, called the PQ2000, is installed at a test site at Pacific Gas and Electric Company (San Ramon, CA, USA) and at a customer site at Oglethorpe Power Corporation (Tucker, GA, USA). The PQ2000 employs off-the-shelf power electronics in an integrated methodology to control the factors that affect the performance and service life of production-model, low-maintenance, flooded lead/acid batteries. This system, and other members of this first generation of lead/acid-based energy storage systems, will need to compete vigorously for a share of an expanding, yet very aggressive, power quality market.
Solar cell power for field instrumentation at White Sands Missile range. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bond, J.W. Jr..; Reckart, D.H. Jr; Milway, W.B.
1978-01-01
The initial phase of an Instrumentation Development Project to explore and document what solar power can do for remote field instrumentation systems is described. The work scope consisted of selection, design, construction, test, and delivery of a solar cell power system for White Sands Missile Range. A Drone Formation Control System Interrogator was selected; a power supply was built and installed in the San Andres Mountain Range at WSMR in late August 1977.
Cassini's RTGs undergo mechanical and electrical verification testing in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
Jet Propulsion Laboratory (JPL) engineers examine the interface surface on the Cassini spacecraft prior to installation of the third radioisotope thermoelectric generator (RTG). The other two RTGs, at left, already are installed on Cassini. The three RTGs will be used to power Cassini on its mission to the Saturnian system. They are undergoing mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL.
1997-07-18
This radioisotope thermoelectric generator (RTG), at center, is ready for electrical verification testing now that it has been installed on the Cassini spacecraft in the Payload Hazardous Servicing Facility. A handling fixture, at far left, remains attached. This is the third and final RTG to be installed on Cassini for the prelaunch tests. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle
GPS synchronized power system phase angle measurements
NASA Astrophysics Data System (ADS)
Wilson, Robert E.; Sterlina, Patrick S.
1994-09-01
This paper discusses the use of Global Positioning System (GPS) synchronized equipment for the measurement and analysis of key power system quantities. Two GPS synchronized phasor measurement units (PMU) were installed before testing. It was indicated that PMUs recorded the dynamic response of the power system phase angles when the northern California power grid was excited by the artificial short circuits. Power system planning engineers perform detailed computer generated simulations of the dynamic response of the power system to naturally occurring short circuits. The computer simulations use models of transmission lines, transformers, circuit breakers, and other high voltage components. This work will compare computer simulations of the same event with field measurement.
The RE-Powering Renewable Energy project list tracks completed projects where renewable energy systems have been installed on contaminated lands, landfills, and mine sites.This resource is for informational purposes only and may not be comprehensive.
Cassini's RTGs undergo mechanical and electrical verification testing in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
Jet Propulsion Laboratory (JPL) workers carefully roll into place a platform with a second radioisotope thermoelectric generator (RTG) for installation on the Cassini spacecraft. In background at left, the first of three RTGs already has been installed on Cassini. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. The power units are undergoing mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL.
DoD Can Save Millions by Using Energy Efficient Centralized Aircraft Support Systems.
1982-05-07
recommends that the Secretary of the Air Force: -- Reevaluate the decision not to install centralized systems at tactical bases. If the systems can be...discontinue using the aircraft’s onboard auxillary power units. These units consume tremendous amounts of jet fuel in providing cabin air-conditioning...requirements. Each command has been asked to analyze its bases to determine if centralized systems should be installed. Although a final decision has not
Supply and Demand Control of Distributed Generators in a Microgrid for New Energy
NASA Astrophysics Data System (ADS)
Shimakage, Toyonari; Sumita, Jiro; Uchiyama, Noriyuki; Kato, Takeyoshi; Suzuoki, Yasuo
We report the operational results of distributed generators (DGs) in a microgrid and present the effects after incorporating photovoltaic power generation (PV) systems into the microgrid for electric power system. The microgrid was constructed at the EXPO 2005 Aichi site as part of a demonstration promoted by NEDO. A solution is needed to problems where instability in the DGs that utilize natural energy such as solar light and wind force negatively influence existing electric power systems. So, we developed energy control system and controlled DGs output to reduce the fluctuation at the grid connected point caused by PV system's instability output. Our microgrid consists of DGs such as PV systems, fuel cells, and NaS batteries, and these DGs are controlled by an energy control system. We verified practical effectiveness of the installing the microgrid as follows. (1) 99.5% of the power imbalance in the supply and demand over 30 minutes was within a range of ±3% under normal operating conditions, (2) the microgrid contributes to the load leveling, (3) energy control system smoothes the power flow fluctuation of PV system output at the grid connected point, (4) in the future, installing a microgrid will help reduce the additional LFC (Load Frequency Control) capacity.
Photovoltaics and solar thermal conversion to electricity - Status and prospects
NASA Technical Reports Server (NTRS)
Alper, M. E.
1979-01-01
Photovoltaic power system technology development includes flat-plate silicon solar arrays and concentrating solar cell systems, which use silicon and other cell materials such as gallium arsenide. System designs and applications include small remote power systems ranging in size from tens of watts to tens of kilowatts, intermediate load-center applications ranging in size from tens to hundreds of kilowatts, and large central plant installations, as well as grid-connected rooftop applications. The thermal conversion program is concerned with large central power systems and small power applications.
Army Net Zero Prove Out. Net Zero Energy Best Practices
2014-11-18
energy which is then used to drive a heat engine to generate electrical power. Geothermal Power – These systems use thermal energy generated and...stored in the earth as a generating source for electricity. Several pilot installations are investigating this technology by conducting geothermal ...concentrate solar thermal energy which is then used to drive a heat engine to generate electrical power. • Geothermal Power - These systems use thermal energy
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
NASA Astrophysics Data System (ADS)
Yokomizu, Yasunobu
Dispersed generation systems, such as micro gas-turbines and fuel cells, have been installed on some of commercial facilities. Smaller dispersed generators like solar photovoltaics have been also located on the several of individual homes. The trends in the introduction of the these generation systems seem to continue in the future and to cause the power system to have the enormous number of the dispersed generation systems. The present report discusses the near-future power distribution systems.
THROUGH-THE EARTH (TTE) SYSTEM AND THE IN-MINE POWER LINE (IMPL) SYSTEM
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zvi H. Meiksin
Work has progressed on both subsystems: the through-the-earth (TTE) system and the In-Mine Power Line (IMPL) system. After the Lab prototype of the IMPL system was perfected to function satisfactorily, the thrust of the work focused on building a first production prototype that can be installed and tested inside a mine. To obtain multi-channel voice communication through the TTE system, effort has proceeded to compress voice messages and make the format compatible with the power-line interface protocol.
Commercialization of PV-powered pumping systems for use in utility PV service programs. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-03-01
The project described in this report was a commercialization effort focused on cost-effective remote water pumping systems for use in utility-based photovoltaic (PV) service programs. The project combined a commercialization strategy tailored specifically for electric utilities with the development of a PV-powered pumping system that operates conventional ac pumps rather than relying on the more expensive and less reliable PV pumps on the market. By combining these two attributes, a project goal was established of creating sustained utility purchases of 250 PV-powered water pumping systems per year. The results of each of these tasks are presented in two parts containedmore » in this Final Summary Report. The first part summarizes the results of the Photovoltaic Services Network (PSN) as a new business venture, while the second part summarizes the results of the Golden Photon system installations. Specifically, results and photographs from each of the system installations are presented in this latter part.« less
Innovative Technology Reduces Power Plant Emissions - Commercialization Success
NASA Technical Reports Server (NTRS)
Parrish, Clyde
2004-01-01
Emission control system development includes: (1) Development of new oxidizer scrubber system to eliminate NOx waste and produce fertilizer (2) Technology licensed and a 1 to 3 MWatt-scale prototype installed on. power plant (3) Development of method to oxidize NO. to N02 (4) Experience gained from licensing NASA technology
Forecasting Electric Power Generation of Photovoltaic Power System for Energy Network
NASA Astrophysics Data System (ADS)
Kudo, Mitsuru; Takeuchi, Akira; Nozaki, Yousuke; Endo, Hisahito; Sumita, Jiro
Recently, there has been an increase in concern about the global environment. Interest is growing in developing an energy network by which new energy systems such as photovoltaic and fuel cells generate power locally and electric power and heat are controlled with a communications network. We developed the power generation forecast method for photovoltaic power systems in an energy network. The method makes use of weather information and regression analysis. We carried out forecasting power output of the photovoltaic power system installed in Expo 2005, Aichi Japan. As a result of comparing measurements with a prediction values, the average prediction error per day was about 26% of the measured power.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bergey, M.
This paper presents an overview of the electric power system in Thailand. 99% of the country is electrified, but much of this is with diesel generators which leaves high costs but a high level of service. The paper discusses renewable energy projects which have been sited in the country, and examples of hybrid systems which have been retrofit into existing diesel generator systems. Photovoltaic and hydroelectric power projects are described. Dedicated systems have been installed for water pumping and battery charging applications.
NASA Astrophysics Data System (ADS)
Erickson, Dennis C.; Donnelly, Matt K.
1995-04-01
The authors present a design concept describing a multifunctional data acquisition and analysis architecture for advanced power system monitoring. The system is tailored to take advantage of the salient features of low energy sensors, particularly optical types. The discussion of the system concept and optical sensors is based on research at BPA and PNL and on progress made at existing BPA installations and other sites in the western power system.
46 CFR 169.688 - Power supply.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST... Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The... provide electric power for any vital system listed in § 169.642 of this subchapter, at least two...
46 CFR 169.688 - Power supply.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST... Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The... provide electric power for any vital system listed in § 169.642 of this subchapter, at least two...
PROTOTYPE EICHER FISH SCREEN AND EVALUATION FACILITY, INSTALLED IN 1990 ...
PROTOTYPE EICHER FISH SCREEN AND EVALUATION FACILITY, INSTALLED IN 1990 ON #1 PENSTOCK. PROJECT SPONSORED BY THE ELECTRICAL POWER RESEARCH INSTITUTE TO TRANSFER FISH DOWNSTREAM PAST THE TURBINES. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
46 CFR 120.352 - Battery categories.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Battery categories. 120.352 Section 120.352 Shipping... and Distribution Systems § 120.352 Battery categories. This section applies to batteries installed to... sources of power to final emergency loads. (a) Large. A large battery installation is one connected to a...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Dual voltage generators. 183.324 Section 183.324... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators. (a) A dual voltage generator installed on a vessel shall be of the grounded type, where: (1) The...
46 CFR 120.352 - Battery categories.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Battery categories. 120.352 Section 120.352 Shipping... and Distribution Systems § 120.352 Battery categories. This section applies to batteries installed to... sources of power to final emergency loads. (a) Large. A large battery installation is one connected to a...
46 CFR 120.352 - Battery categories.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Battery categories. 120.352 Section 120.352 Shipping... and Distribution Systems § 120.352 Battery categories. This section applies to batteries installed to... sources of power to final emergency loads. (a) Large. A large battery installation is one connected to a...
46 CFR 120.352 - Battery categories.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Battery categories. 120.352 Section 120.352 Shipping... and Distribution Systems § 120.352 Battery categories. This section applies to batteries installed to... sources of power to final emergency loads. (a) Large. A large battery installation is one connected to a...
46 CFR 120.352 - Battery categories.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Battery categories. 120.352 Section 120.352 Shipping... and Distribution Systems § 120.352 Battery categories. This section applies to batteries installed to... sources of power to final emergency loads. (a) Large. A large battery installation is one connected to a...
Installation of automatic control at experimental breeder reactor II
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larson, H.A.; Booty, W.F.; Chick, D.R.
1985-08-01
The Experimental Breeder Reactor II (EBR-II) has been modified to permit automatic control capability. Necessary mechanical and electrical changes were made on a regular control rod position; motor, gears, and controller were replaced. A digital computer system was installed that has the programming capability for varied power profiles. The modifications permit transient testing at EBR-II. Experiments were run that increased power linearly as much as 4 MW/s (16% of initial power of 25 MW(thermal)/s), held power constant, and decreased power at a rate no slower than the increase rate. Thus the performance of the automatic control algorithm, the mechanical andmore » electrical control equipment, and the qualifications of the driver fuel for future power change experiments were all demonstrated.« less
Easily installable behavioral monitoring system with electric field sensor.
Tsukamoto, Sosuke; Machida, Yuichiro; Kameda, Noriyuki; Hoshino, Hiroshi; Tamura, Toshiyo
2007-01-01
This paper describes a wireless behavioral monitoring system equipped with an electric field sensor. The sensor unit was designed to obtain information regarding the usage of home electric appliances such as the television, microwave oven, coffee maker, etc. by measuring the electric field surrounding them. It is assumed that these usage statistics could provide information regarding the indoor behavior of a subject. Since the sensor can be used by simply attaching it to an appliance and does not require any wiring for its installation, this system can be temporarily installed in any ordinary house. A simple interface for selecting the threshold value of appliances' power on/off states was introduced. The experimental results reveal that the proposed system can be installed by individuals in their residences in a short time and the usage statistics of home appliances can be gathered.
Use of liquid metals in nuclear and thermonuclear engineering, and in other innovative technologies
NASA Astrophysics Data System (ADS)
Rachkov, V. I.; Arnol'dov, M. N.; Efanov, A. D.; Kalyakin, S. G.; Kozlov, F. A.; Loginov, N. I.; Orlov, Yu. I.; Sorokin, A. P.
2014-05-01
By now, a good deal of experience has been gained with using liquid metals as coolants in nuclear power installations; extensive knowledge has been gained about the physical, thermophysical, and physicochemical properties of these coolants; and the scientific principles and a set of methods and means for handling liquid metals as coolants for nuclear power installations have been elaborated. Prototype and commercialgrade sodium-cooled NPP power units have been developed, including the BOR-60, BN-350, and BN-600 power units (the Soviet Union); the Rapsodie, Phenix, and Superphenix power units (France), the EBR-II power unit (the United States); and the PFR power unit (the United Kingdom). In Russia, dedicated nuclear power installations have been constructed, including those with a lead-bismuth coolant for nuclear submarines and with sodium-potassium alloy for spacecraft (the Buk and Topol installations), which have no analogs around the world. Liquid metals (primarily lithium and its alloy with lead) hold promise for use in thermonuclear power engineering, where they can serve not only as a coolant, but also as tritium-producing medium. In this article, the physicochemical properties of liquid metal coolants, as well as practical experience gained from using them in nuclear and thermonuclear power engineering and in innovative technologies are considered, and the lines of further research works are formulated. New results obtained from investigations carried out on the Pb-Bi and Pb for the SVBR and BREST fast-neutron reactors (referred to henceforth as fast reactors) and for controlled accelerator systems are described.
Powered orthosis and attachable power-assist device with Hydraulic Bilateral Servo System.
Ohnishi, Kengo; Saito, Yukio; Oshima, Toru; Higashihara, Takanori
2013-01-01
This paper discusses the developments and control strategies of exoskeleton-type robot systems for the application of an upper limb powered orthosis and an attachable power-assist device for care-givers. Hydraulic Bilateral Servo System, which consist of a computer controlled motor, parallel connected hydraulic actuators, position sensors, and pressure sensors, are installed in the system to derive the joint motion of the exoskeleton arm. The types of hydraulic component structure and the control strategy are discussed in relation to the design philosophy and target joints motions.
A review of oscillating water columns.
Heath, T V
2012-01-28
This paper considers the history of oscillating water column (OWC) systems from whistling buoys to grid-connected power generation systems. The power conversion from the wave resource through to electricity via pneumatic and shaft power is discussed in general terms and with specific reference to Voith Hydro Wavegen's land installed marine energy transformer (LIMPET) plant on the Scottish island of Islay and OWC breakwater systems. A report on the progress of other OWC systems and power take-off units under commercial development is given, and the particular challenges faced by OWC developers reviewed.
Design of power-plant installations pressure-loss characteristics of duct components
NASA Technical Reports Server (NTRS)
Henry, John R
1944-01-01
A correlation of what are believed to be the most reliable data available on duct components of aircraft power-plant installations is presented. The information is given in a convenient form and is offered as an aid in designing duct systems and, subject to certain qualifications, as a guide in estimating their performance. The design and performance data include those for straight ducts; simple bends of square, circular, and elliptical cross sections; compound bends; diverging and converging bends; vaned bends; diffusers; branch ducts; internal inlets; and an angular placement of heat exchangers. Examples are included to illustrate methods of applying these data in analyzing duct systems. (author)
NASA Technical Reports Server (NTRS)
Lutwack, R.
1974-01-01
A technical assessment of a program to develop photovoltaic power system technology for large-scale national energy applications was made by analyzing and judging the alternative candidate photovoltaic systems and development tasks. A program plan was constructed based on achieving the 10 year objective of a program to establish the practicability of large-scale terrestrial power installations using photovoltaic conversion arrays costing less than $0.50/peak W. Guidelines for the tasks of a 5 year program were derived from a set of 5 year objectives deduced from the 10 year objective. This report indicates the need for an early emphasis on the development of the single-crystal Si photovoltaic system for commercial utilization; a production goal of 5 x 10 to the 8th power peak W/year of $0.50 cells was projected for the year 1985. The developments of other photovoltaic conversion systems were assigned to longer range development roles. The status of the technology developments and the applicability of solar arrays in particular power installations, ranging from houses to central power plants, was scheduled to be verified in a series of demonstration projects. The budget recommended for the first 5 year phase of the program is $268.5M.
Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
This radioisotope thermoelectric generator (RTG), at center, is ready for electrical verification testing now that it has been installed on the Cassini spacecraft in the Payload Hazardous Servicing Facility. A handling fixture, at far left, remains attached. This is the third and final RTG to be installed on Cassini for the prelaunch tests. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle.
NASA Technical Reports Server (NTRS)
Bifano, W. J.; Ratajczak, A. F.; Ice, W. J.
1978-01-01
A stand alone photovoltaic power system for installation in the Papago Indian village of Schuchuli is being designed and fabricated to provide electricity for village water pumping and basic domestic needs. The system will consist of a 3.5 kW (peak) photovoltaic array; controls, instrumentations, and storage batteries located in an electrical equipment building and a 120 volt dc village distribution network. The system will power a 2 HP dc electric motor.
A feasibility assessment of nuclear reactor power system concepts for the NASA Growth Space Station
NASA Technical Reports Server (NTRS)
Bloomfield, H. S.; Heller, J. A.
1986-01-01
A preliminary feasibility assessment of the integration of reactor power system concepts with a projected growth Space Station architecture was conducted to address a variety of installation, operational, disposition and safety issues. A previous NASA sponsored study, which showed the advantages of Space Station - attached concepts, served as the basis for this study. A study methodology was defined and implemented to assess compatible combinations of reactor power installation concepts, disposal destinations, and propulsion methods. Three installation concepts that met a set of integration criteria were characterized from a configuration and operational viewpoint, with end-of-life disposal mass identified. Disposal destinations that met current aerospace nuclear safety criteria were identified and characterized from an operational and energy requirements viewpoint, with delta-V energy requirement as a key parameter. Chemical propulsion methods that met current and near-term application criteria were identified and payload mass and delta-V capabilities were characterized. These capabilities were matched against concept disposal mass and destination delta-V requirements to provide a feasibility of each combination.
Innovative Technology Reduces Power Plant Emissions-Commercialization Success
NASA Technical Reports Server (NTRS)
Parrish, Clyde; Chung, Landy
2004-01-01
Overview of emission control system development: (1) Development of new oxidizer scrubber system to eliminate NOx waste and produce fertilizer (2) Technology licensed and a 1 to 3 MWatt-scale prototype installed on power plant (3) Development of method to oxidize NO to NO2 (4) Experience gained from licensing NASA technology.
46 CFR 112.55-15 - Capacity of storage batteries.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Capacity of storage batteries. 112.55-15 Section 112.55... LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-15 Capacity of storage batteries. (a) A storage battery for an emergency lighting and power system must have the capacity— (1) To close all...
46 CFR 112.55-15 - Capacity of storage batteries.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Capacity of storage batteries. 112.55-15 Section 112.55... LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-15 Capacity of storage batteries. (a) A storage battery for an emergency lighting and power system must have the capacity— (1) To close all...
46 CFR 112.55-15 - Capacity of storage batteries.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Capacity of storage batteries. 112.55-15 Section 112.55... LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-15 Capacity of storage batteries. (a) A storage battery for an emergency lighting and power system must have the capacity— (1) To close all...
46 CFR 112.55-15 - Capacity of storage batteries.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Capacity of storage batteries. 112.55-15 Section 112.55... LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-15 Capacity of storage batteries. (a) A storage battery for an emergency lighting and power system must have the capacity— (1) To close all...
46 CFR 112.55-15 - Capacity of storage batteries.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Capacity of storage batteries. 112.55-15 Section 112.55... LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-15 Capacity of storage batteries. (a) A storage battery for an emergency lighting and power system must have the capacity— (1) To close all...
Photovoltaic stand-alone modular systems, phase 2
NASA Technical Reports Server (NTRS)
Naff, G. J.; Marshall, N. A.
1983-01-01
The final hardware and system qualification phase of a two part stand-alone photovoltaic (PV) system development is covered. The final design incorporated modular, power blocks capable of expanding incrementally from 320 watts to twenty kilowatts (PK). The basic power unit (PU) was nominally rated 1.28 kWp. The controls units, power collection buses and main lugs, electrical protection subsystems, power switching, and load management circuits are housed in a common control enclosure. Photo-voltaic modules are electrically connected in a horizontal daisy-chain method via Amp Solarlok plugs mating with compatible connectors installed on the back side of each photovoltaic module. A pair of channel rails accommodate the mounting of the modules into a frameless panel support structure. Foundations are of a unique planter (tub-like) configuration to allow for world-wide deployment without restriction as to types of soil. One battery string capable of supplying approximately 240 ampere hours nominal of carryover power is specified for each basic power unit. Load prioritization and shedding circuits are included to protect critical loads and selectively shed and defer lower priority or noncritical power demands. The baseline system, operating at approximately 2 1/2 PUs (3.2 kW pk.) was installed and deployed. Qualification was successfully complete in March 1983; since that time, the demonstration system has logged approximately 3000 hours of continuous operation under load without major incident.
Photovoltaic stand-alone modular systems, phase 2
NASA Astrophysics Data System (ADS)
Naff, G. J.; Marshall, N. A.
1983-07-01
The final hardware and system qualification phase of a two part stand-alone photovoltaic (PV) system development is covered. The final design incorporated modular, power blocks capable of expanding incrementally from 320 watts to twenty kilowatts (PK). The basic power unit (PU) was nominally rated 1.28 kWp. The controls units, power collection buses and main lugs, electrical protection subsystems, power switching, and load management circuits are housed in a common control enclosure. Photo-voltaic modules are electrically connected in a horizontal daisy-chain method via Amp Solarlok plugs mating with compatible connectors installed on the back side of each photovoltaic module. A pair of channel rails accommodate the mounting of the modules into a frameless panel support structure. Foundations are of a unique planter (tub-like) configuration to allow for world-wide deployment without restriction as to types of soil. One battery string capable of supplying approximately 240 ampere hours nominal of carryover power is specified for each basic power unit. Load prioritization and shedding circuits are included to protect critical loads and selectively shed and defer lower priority or noncritical power demands. The baseline system, operating at approximately 2 1/2 PUs (3.2 kW pk.) was installed and deployed. Qualification was successfully complete in March 1983; since that time, the demonstration system has logged approximately 3000 hours of continuous operation under load without major incident.
Assessment and mitigation of power quality problems for PUSPATI TRIGA Reactor (RTP)
NASA Astrophysics Data System (ADS)
Zakaria, Mohd Fazli; Ramachandaramurthy, Vigna K.
2017-01-01
An electrical power systems are exposed to different types of power quality disturbances. Investigation and monitoring of power quality are necessary to maintain accurate operation of sensitive equipment especially for nuclear installations. This paper will discuss the power quality problems observed at the electrical sources of PUSPATI TRIGA Reactor (RTP). Assessment of power quality requires the identification of any anomalous behavior on a power system, which adversely affects the normal operation of electrical or electronic equipment. A power quality assessment involves gathering data resources; analyzing the data (with reference to power quality standards) then, if problems exist, recommendation of mitigation techniques must be considered. Field power quality data is collected by power quality recorder and analyzed with reference to power quality standards. Normally the electrical power is supplied to the RTP via two sources in order to keep a good reliability where each of them is designed to carry the full load. The assessment of power quality during reactor operation was performed for both electrical sources. There were several disturbances such as voltage harmonics and flicker that exceeded the thresholds. To reduce these disturbances, mitigation techniques have been proposed, such as to install passive harmonic filters to reduce harmonic distortion, dynamic voltage restorer (DVR) to reduce voltage disturbances and isolate all sensitive and critical loads.
Guidelines for traffic signal energy back\\0x2010up systems : final report.
DOT National Transportation Integrated Search
2009-07-01
Power outages affect traffic signalized intersections, leading to potentially serious problems. Current practices of responding to power failures are very basic, ranging from do nothing to installing portable generators. The purpose of this res...
46 CFR 120.324 - Dual voltage generators.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Dual voltage generators. 120.324 Section 120.324... INSTALLATION Power Sources and Distribution Systems § 120.324 Dual voltage generators. (a) A dual voltage generator installed on a vessel shall be of the grounded type, where: (1) The neutral of a dual voltage...
Analysis of Bright Harvest Remote Analysis for Residential Solar Installations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nangle, John; Simon, Joseph
Bright Harvest provides remote shading analysis and design products for residential PV system installers. The National Renewable Energy Laboratory (NREL) through the NREL Commercialization Assistance Program, completed comparative assessments between on-site measurements and remotely calculated values to validate the accuracy of Bright Harvest’s remote shading and power generation.
Prospects of very high power CO{sub 2} laser in welding
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goussain, J.C.; Vire, S.
1996-12-31
A 45 kW laser system was recently installed at Institut de Soudure (IS) in France in order to evaluate the possibilities of such high power beams in welding. Some results of welding various materials (Ta6V, C-steel, Cr-Ni alloys), different thicknesses (>30 mm) and large components (several meters) are presented. Some recent installations of high power laser equipment already integrated into production site or under development in shipbuilding and steel fabrication are described. Finally the objectives of an important R and D program launched recently for exploring the different aspects of laser welding in thick section steel fabrication is outlined.
Simulation evaluation of capacitor bank impact on increasing supply current for alumunium production
NASA Astrophysics Data System (ADS)
Hasan, S.; Badra, K.; Dinzi, R.; Suherman
2018-03-01
DC current supply to power the electrolysis process in producing aluminium at PT Indonesia Asahan Aluminium (Persero) is about 193 kA. At this condition, the load voltage regulator (LVR) transformer generates 0.89 lagging power factor. By adding the capacitor bank to reduce the harmonic distortion, it is expected that the supply current will increase. This paper evaluates capacitor bank installation impact on the system by using ETAP 12.0 simulation. It has been obtained that by installing 90 MVAR capacitor bank in the secondary part of LVR, the power factor is corrected about 8% and DC current increases about 13.5%.
78 FR 4092 - Airworthiness Directives; Cessna Aircraft Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... aircraft's hydraulic power pack wiring for incorrect installation, and if needed, correct the installation... hydraulic power pack wiring for incorrect installation, and if needed, correct the installation. Since...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mueller Steffen; Wibbing Sascha; Weigel Robert
2015-07-01
Signal acquisition and data transmission for innovative sensor systems and networks inside the containment of nuclear power plants (NPPs) is still a challenge with respect to safety, performance, reliability, availability, and costs. This especially applies to equipment upgrades for existing plants, special measurements, but also for new builds. This paper presents a novel method for efficient and cost-effective sensor signal acquisition and data transmission via power lines, in order to cope with the disadvantages of common system architectures that often suffer from poor signal integrity due to raw data transmissions via long cables, huge efforts and costs for installation, andmore » low flexibility with respect to maintenance and upgrades. A transmitter-receiver architecture is proposed that allows multiplexing of multiple sensor inputs for unidirectional point-to-point transmission by superimposing information signals on existing AC or DC supply lines, but also on active and inactive sensor wires, or spare cables, using power line communication (PLC) technology. Based on commercial off-the-shelf (COTS) electronic parts, a radiation hard transmitter hardware is designed to operate in harsh environment within the containment during full plant operation. The system's modular approach allows application specific trade-offs between redundancy and throughput regarding data transmission, as well as various sensor input front-ends which are compatible with state of the art systems. PLC technology eliminates the need for costly installation of additional cables and wall penetrations, while providing a complementary and diverse communication technology for upgrades of existing systems. At the receiver side in low dose areas, signals are extracted from the power line, demodulated, and de-multiplexed, in order to regain the original sensor signal information and provide it either in analog or digital output format. Successful laboratory qualification tests, field trails, and a demonstrator setup installation within a NPP verify the overall performance of the proposed system. (authors)« less
The design of a wireless batteryless biflash installation with high power LEDs
NASA Astrophysics Data System (ADS)
Cappelle, J.; De Geest, W.; Hanselaer, P.
2011-05-01
Adding flashlights at crosswalks may make these weak traffic points safer. Unfortunately plugging in traffic lights into the electrical grid is expensive and complex. This paper reports about the energetic, the electronic and the optical design and building of a wireless and batteryless biflash installation in the framework of a flemish SME supporting program. The energy is supplied by a small solar panel and is buffered by supercapacitors instead of batteries. This has the advantage of being maintenance free: the number of charge-discharge cycles is almost unlimited because there is no chemical reaction involved in the storage mechanism. On the other hand the limited energy storage capacity of supercapacitors requires a new approach for the system design. Based on the EN-12352 standard for warning light devices, all design choices were filled in to be as energy efficient as possible. The duty cycle and the light output of the high power led flashlights are minimized. The components for the electronic circuits for the led driver, the control and the RF communication are selected based on their energy consumption and power management techniques are implemented. A lot of energy is saved by making the biflash system active. The leds are only flashing on demand or at preprogrammed moments. A biflash installation is typically installed at both sides of a crosswalk. A call at one of the sides should result in flashing at both sides. To maintain the drag and drop principle, a wireless RF communication system is designed.
Analyzing Small Signal Stability of Power System based on Online Data by Use of SMES
NASA Astrophysics Data System (ADS)
Ishikawa, Hiroyuki; Shirai, Yasuyuki; Nitta, Tanzo; Shibata, Katsuhiko
The purpose of this study is to estimate eigen-values and eigen-vectors of a power system from on-line data to evaluate the power system stability. Power system responses due to the small power modulation of known pattern from SMES (Superconducting Magnetic Energy Storage) were analyzed, and the transfer functions between the power modulation and power oscillations of generators were obtained. Eigen-values and eigen-vectors were estimated from the transfer functions. Experiments were carried out by use of a model SMES and Advanced Power System Analyzer (APSA), which is an analogue type power system simulator of Kansai Electric Power Company Inc., Japan. Changes in system condition were observed by the estimated eigen-values and eigen-vectors. Result agreed well with the resent report and digital simulation. This method gives a new application for SMES, which will be installed for improving electric power quality.
GOES data-collection system instrumentation, installation, and maintenance manual
Blee, J.W.; Herlong, H.E.; Kaufmann, C.D.; Hardee, J.H.; Field, M.L.; Middelburg, R.F.
1986-01-01
The purpose of the manual is to describe the installation, operation, and maintenance of Geostationary Operational Environmental Satellite (GOES) data collection platforms (DCP's) and associated equipment. This manual is not a substitute for DCP manufacturers ' manuals but is additional material that describes the application of data-collection platforms in the Water Resources Division. Power supplies, encoders, antennas, Mini Monitors, voltage analog devices, and the installation of these at streamflow-gaging stations are discussed in detail. (USGS)
Flate-plate photovoltaic power systems handbook for Federal agencies
NASA Technical Reports Server (NTRS)
Cochrane, E. H.; Lawson, A. C.; Savage, C. H.
1984-01-01
The primary purpose is to provide a tool for personnel in Federal agencies to evaluate the viability of potential photovoltaic applications. A second objective is to provide descriptions of various photovoltaic systems installed by different Federal agencies under the Federal Photovoltaic Utilization Program so that other agencies may consider similar applications. A third objective is to share lessons learned to enable more effective procurement, design, installation, and operation of future photovoltaic systems. The intent is not to provide a complete handbook, but rather to provide a guide for Federal agency personnel with additional information incorporated by references. The steps to be followed in selecting, procuring, and installing a photovoltaic application are given.
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.714 Cab. The compartment of a locomotive from which the propelling power and power brakes of the train are manually...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
PV system field experience and reliability
NASA Astrophysics Data System (ADS)
Durand, Steven; Rosenthal, Andrew; Thomas, Mike
1997-02-01
Hybrid power systems consisting of battery inverters coupled with diesel, propane, or gasoline engine-driven electrical generators, and photovoltaic arrays are being used in many remote locations. The potential cost advantages of hybrid systems over simple engine-driven generator systems are causing hybrid systems to be considered for numerous applications including single-family residential, communications, and village power. This paper discusses the various design constraints of such systems and presents one technique for reducing hybrid system losses. The Southwest Technology Development Institute under contract to the National Renewable Energy Laboratory and Sandia National Laboratories has been installing data acquisition systems (DAS) on a number of small and large hybrid PV systems. These systems range from small residential systems (1 kW PV - 7 kW generator), to medium sized systems (10 kW PV - 20 kW generator), to larger systems (100 kW PV - 200 kW generator). Even larger systems are being installed with hundreds of kilowatts of PV modules, multiple wind machines, and larger diesel generators.
30 CFR 75.1101-5 - Installation of foam generator systems.
Code of Federal Regulations, 2012 CFR
2012-07-01
.... (b) Foam generator systems shall be equipped with a fire sensor which actuates the system, and each.... (d) Water, power, and chemicals required shall be adequate to maintain water or foam flow for no less...
30 CFR 75.1101-5 - Installation of foam generator systems.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... (b) Foam generator systems shall be equipped with a fire sensor which actuates the system, and each.... (d) Water, power, and chemicals required shall be adequate to maintain water or foam flow for no less...
30 CFR 75.1101-5 - Installation of foam generator systems.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... (b) Foam generator systems shall be equipped with a fire sensor which actuates the system, and each.... (d) Water, power, and chemicals required shall be adequate to maintain water or foam flow for no less...
Integrated Field Testing of Fuel Cells and Micro-Turbines
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jerome R. Temchin; Stephen J. Steffel
A technical and economic evaluation of the prospects for the deployment of distributed generation on Long Beach Island, New Jersey concluded that properly sited DG would defer upgrading of the electric power grid for 10 years. This included the deployment of fuel cells or microturbines as well as reciprocating engines. The implementation phase of this project focused on the installation of a 120 kW CHP microturbine system at the Harvey Cedars Bible Conference in Harvey Cedars, NJ. A 1.1 MW generator powered by a gas-fired reciprocating engine for additional grid support was also installed at a local substation. This reportmore » contains installation and operation issues as well as the utility perspective on DG deployment.« less
The Land-Use Efficiency of Big Solar
NASA Astrophysics Data System (ADS)
Hernandez, R. R.; Hoffacker, M.; Field, C. B.
2013-12-01
As utility-scale solar energy (USSE) systems increase in size and numbers globally, there is a growing interest in understanding environmental interactions between solar energy development and land-use decisions. Maximizing the efficient use of land for USSE is one of the major challenges in realizing the full potential of solar energy, however, the land-use efficiency (LUE; Wm-2) of USSE remains unknown. We quantified the nominal LUE of 183 USSE installations (> 20 megawatts; planned, under construction, and operating) using California as a case study. In California, we found that USSE installations are concentrated in the Central Valley and desert interior of southern California and have a LUE of 35.01 Wm-2. The installations comprise approximately 86,000 hectares (ha) and more land is allocated for photovoltaic schemes (72,294 ha) than for concentrating solar power (13,604 ha). Photovoltaic installations are greater in abundance (93%) than concentrating solar power, but technology type and nameplate capacity has no impact on LUE. More USSE installations are on private land (80%) and have a significantly greater LUE (35.83 Wm-2) than installations on public land (25.42 Wm-2). We show how LUE can be improved and how co-benefit opportunities can be integrated with USSE enterprises to maximize their economic, energetic, and environmental returns on investment. (Left) The distribution of utility-scale solar energy installations in California (constructed and in progress) by technology type: concentrating solar power and photovoltaic with county lines shown. (Right) The distribution of utility-scale solar energy installations in California (constructed and in progress) by location: public or privately owned land. Larger capacity installations (megawatts) have relatively greater point size.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maget, H.J.R.
1979-06-15
This program consists of a design study and component development for an experimental 50-kWp photovoltaic concentrator system to supply power to the San Ramon substation of the Pacific Gas and Electric Company. The photovoltaic system is optimized to produce peaking power to relieve the air conditioning load on the PG and E system during summer afternoons; and would therefore displace oil-fired power generation capacity. No electrical storage is required. The experiment would use GaAs concentrator cells with point-focus fresnel lenses operating at 400X, in independent tracking arrays of 440 cells each, generating 3.8 kWp. Fourteen arrays, each 9 feet bymore » 33 feet, are connected electrically in series to generate the 50 kWp. The high conversion efficiency possible with GaAs concentrator cells results in a projected annual average system efficiency (AC electric power output to sunlight input) of better than 15%. The capability of GaAs cells for high temperature operation made possible the design of a total energy option, whereby thermal power from selected arrays could be used to heat and cool the control center for the installation. System design and analysis, fabrication and installation, environmental assessment, and cost projections are described in detail. (WHK)« less
Installation of solar PV systems in Sri Lanka
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fernando, M.P.T.P.
1995-10-01
The tropical country of Sri Lanka has hydroelectric power plants sufficient to provide electricity to only 40% of its 25,000 villages. The electric power needs of the average Sri Lankan rural communities are basic: three or four lights to illuminate their house and a power supply for their televisions. Solar radiation is abundant throughout the year. To take advantage of this resource, the Sarvodaya Rural Technical Services launched a Solar PV pilot demonstration project in the rural areas not served by the electric grid. The systems were being installed on an individual residence basis and funded by loans. Social andmore » cultural problems which have arisen during the course of the project have slowed its implementation. This study identifies the problems and makes recommendations to resolve the current problems and avoid new ones.« less
Workers install the RTGs on the Cassini spacecraft at LC 40, CCAS
NASA Technical Reports Server (NTRS)
1997-01-01
At Launch Complex 40 on Cape Canaveral Air Station, workers are installing three Radioisotope Thermoelectric Generators (RTGs) on the Cassini spacecraft. RTGs are lightweight, compact spacecraft electrical power systems that have flown successfully on 23 previous U.S. missions over the past 37 years. These generators produce power by converting heat into electrical energy; the heat is provided by the natural radioactive decay of plutonium-238 dioxide, a non-weapons-grade material. RTGs enable spacecraft to operate at significant distances from the Sun where solar power systems would not be feasible. Cassini will travel two billion miles to reach Saturn and another 1.1 billion miles while in orbit around Saturn. Cassini is undergoing final preparations for liftoff on a Titan IVB/Centaur launch vehicle, with the launch window opening at 4:55 a.m. EDT, Oct. 13.
46 CFR 112.55-5 - Emergency lighting loads.
Code of Federal Regulations, 2010 CFR
2010-10-01
... AND POWER SYSTEMS Storage Battery Installation § 112.55-5 Emergency lighting loads. When supplying emergency lighting loads, the storage battery initial voltage must not exceed the standard system voltage by...
46 CFR 112.55-5 - Emergency lighting loads.
Code of Federal Regulations, 2011 CFR
2011-10-01
... AND POWER SYSTEMS Storage Battery Installation § 112.55-5 Emergency lighting loads. When supplying emergency lighting loads, the storage battery initial voltage must not exceed the standard system voltage by...
46 CFR 112.55-5 - Emergency lighting loads.
Code of Federal Regulations, 2013 CFR
2013-10-01
... AND POWER SYSTEMS Storage Battery Installation § 112.55-5 Emergency lighting loads. When supplying emergency lighting loads, the storage battery initial voltage must not exceed the standard system voltage by...
46 CFR 112.55-5 - Emergency lighting loads.
Code of Federal Regulations, 2014 CFR
2014-10-01
... AND POWER SYSTEMS Storage Battery Installation § 112.55-5 Emergency lighting loads. When supplying emergency lighting loads, the storage battery initial voltage must not exceed the standard system voltage by...
46 CFR 112.55-5 - Emergency lighting loads.
Code of Federal Regulations, 2012 CFR
2012-10-01
... AND POWER SYSTEMS Storage Battery Installation § 112.55-5 Emergency lighting loads. When supplying emergency lighting loads, the storage battery initial voltage must not exceed the standard system voltage by...
Solar domestic hot water system installed at Texas City, Texas
NASA Technical Reports Server (NTRS)
1980-01-01
This is the final technical report of the solar energy system located at LaQuinta Motor Inn, Texas City, Texas. The system was designed to supply 63 percent of the total hot water load for a new 98 unit motor inn. The solar energy system consists of a 2100 square feet Raypack liquid flat plate collector subsystem and a 2500 gallon storage subsystem circulating hot water producing 3.67 x 10 to the 8th power Btu/year. Abstracts from the site files, specification references, drawings, installation, operation, and maintenance instructions are included.
NASA Astrophysics Data System (ADS)
Moyer, Rachael M.
Following a proposal for the installation of high voltage power lines in northwest Arkansas, a controversial policy debate emerged. Proponents of the transmission line argue that such an installation is inevitable and necessary to efficiently and reliably support the identified electric load in the region. Opponents claim that the lines will degrade the natural environment and hamper the tourism-based local economy in affected regions, notably in Ozark Mountain areas. This study seeks to understand how local policy elites perceive the benefits and risks associated with proposed transmission lines, which is a critical step in comprehending the formation and changes of related government policies. First, based upon the dual process theory of judgment, this study systematically investigates the triadic relationships between (a) more profound personal value predispositions, (b) affects and feelings, and (c) perceived benefits and risks related to the proposed installation of high voltage power lines among local policy elites in the state of Arkansas. Next, this study focuses more specifically on the role of value predispositions, specific emotional dimensions of affect heuristics, and perceptions pertaining to high voltage power line risks and benefits. Using original data collected from a statewide Internet survey of 420 local leaders and key policymakers about their opinions on the related issues, other factors claimed by previous literature, including trust, knowledge level, and demographic characteristics are considered. Analytical results suggest that grid-group cultural predispositions, as deeply held core values within local policy elites' individual belief systems, both directly and indirectly -- through affective feelings -- shape perceived utility associated with the installation of high voltage power lines. Recognizing that risk perceptions factor into policy decisions, some practical considerations for better designing policy addressing controversial issues of this nature.
46 CFR 183.378 - Ungrounded systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Ungrounded systems. 183.378 Section 183.378 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.378 Ungrounded systems. Each ungrounded system must be provided with a suitably sensitive ground detection system located at the respective...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier systems. (a) Each semiconductor rectifier system must have an adequate heat removal system that prevents...
46 CFR 183.378 - Ungrounded systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Ungrounded systems. 183.378 Section 183.378 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.378 Ungrounded systems. Each ungrounded system must be provided with a suitably sensitive ground detection system located at the respective...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier systems. (a) Each semiconductor rectifier system must have an adequate heat removal system that prevents...
NASA Technical Reports Server (NTRS)
Eichenberg, Dennis J.
2009-01-01
The NASA Glenn Research Center (GRC) has developed, installed, and tested a 12 kW DC grid-tied photovoltaic (PV) power system at the GRC Visitor s Center. This system utilizes a unique ballast type roof mount for installing the photovoltaic panels on the roof of the Visitor s Center with no alterations or penetrations to the roof. The PV system has generated in excess of 15000 kWh since operation commenced in August 2008. The PV system is providing power to the GRC grid for use by all. Operation of the GRC Visitor s Center PV system has been completely trouble free. A grid-tied PV power system is connected directly to the utility distribution grid. Facility power can be obtained from the utility system as normal. The PV system is synchronized with the utility system to provide power for the facility, and excess power is provided to the utility. The project transfers space technology to terrestrial use via nontraditional partners. GRC personnel glean valuable experience with PV power systems that are directly applicable to various space power systems, and provides valuable space program test data. PV power systems help to reduce harmful emissions and reduce the Nation s dependence on fossil fuels. Power generated by the PV system reduces the GRC utility demand, and the surplus power aids the community. Present global energy concerns reinforce the need for the development of alternative energy systems. Modern PV panels are readily available, reliable, efficient, and economical with a life expectancy of at least 25 years. Modern electronics has been the enabling technology behind grid-tied power systems, making them safe, reliable, efficient, and economical with a life expectancy of at least 25 years. Based upon the success of the GRC Visitor s Center PV system, additional PV power system expansion at GRC is under consideration. The GRC Visitor s Center grid-tied PV power system was successfully designed and developed which served to validate the basic principles described, and the theoretical work that was performed. The report concludes that grid-tied photovoltaic power systems are reliable, maintenance free, long life power systems, and are of significant value to NASA and the community.
NASA Astrophysics Data System (ADS)
Dulǎu, Lucian Ioan
2015-12-01
This paper describes the simulation of a microgrid system with storage technologies. The microgrid comprises 6 distributed generators (DGs), 3 loads and a 150 kW storage unit. The installed capacity of the generators is 1100 kW, while the total load demand is 900 kW. The simulation is performed by using a SCADA software, considering the power generation costs, the loads demand and the system's power losses. The generators access the system in order of their power generation cost. The simulation is performed for the entire day.
Consequences of Fire: The Killing Fumes
... Electric Vehicles Fire Fighter Safety and Response for Solar Power Systems Fire Fighting Tactics Under Wind Driven ... Protection Devices Development of Fire Mitigations Solutions for PV Systems Installed on Building Roofs - Phase 1 Electric/ ...
Installation package maxi-therm S-101 heating module
NASA Technical Reports Server (NTRS)
1977-01-01
The installation, operation and maintenance of the Maxi-Therm S-101 Thermosypnon Heating Module is described. The Maxi-Therm S-101 is a packaged unit, complete with air filter, blower, electrical controls, and a thermosyphon liquid to air heat exchanger. It is intended for use in residential solar heating systems and can utilize off-peak electrical power.
On the possibility of generation of cold and additional electric energy at thermal power stations
NASA Astrophysics Data System (ADS)
Klimenko, A. V.; Agababov, V. S.; Borisova, P. N.
2017-06-01
A layout of a cogeneration plant for centralized supply of the users with electricity and cold (ECCG plant) is presented. The basic components of the plant are an expander-generator unit (EGU) and a vapor-compression thermotransformer (VCTT). At the natural-gas-pressure-reducing stations, viz., gas-distribution stations and gas-control units, the plant is connected in parallel to a throttler and replaces the latter completely or partially. The plant operates using only the energy of the natural gas flow without burning the gas; therefore, it can be classified as a fuelless installation. The authors compare the thermodynamic efficiencies of a centralized cold supply system based on the proposed plant integrated into the thermal power station scheme and a decentralized cold supply system in which the cold is generated by electrically driven vapor-compression thermotransformers installed on the user's premises. To perform comparative analysis, the exergy efficiency was taken as the criterion since in one of the systems under investigation the electricity and the cold are generated, which are energies of different kinds. It is shown that the thermodynamic efficiency of the power supply using the proposed plant proves to be higher within the entire range of the parameters under consideration. The article presents the results of investigating the impact of the gas heating temperature upstream from the expander on the electric power of the plant, its total cooling capacity, and the cooling capacities of the heat exchangers installed downstream from the EGU and the evaporator of the VCTT. The results of calculations are discussed that show that the cold generated at the gas-control unit of a powerful thermal power station can be used for the centralized supply of the cold to the ventilation and conditioning systems of both the buildings of the power station and the neighboring dwelling houses, schools, and public facilities during the summer season.
NASA Astrophysics Data System (ADS)
Kaczmarczyk, Tomasz Z.; Ihnatowicz, Eugeniusz; Żywica, Grzegorz; Kiciński, Jan
2015-11-01
The paper presents the results of experimental investigations of the ORC system with two scroll expanders which have been used as a source of electricity. Theworking fluidwas HFE7100 - a newly engineered fluid with a unique heat transfer and favourable environmental properties. In the ORC system three heat exchangers were used (evaporator, regenerator, condenser) and before expanders the droplet separator was installed. As a source of heat an innovative biomass boiler was used. Studies have been carried out for the expanders worked in series and in parallel. The paper presents the thermal and fluidflow properties of the ORC installation for the selected flow rates and different temperatures of the working medium. The characteristics of output electrical power, operating speed and vibrations for scroll expanders were also presented.
Building 865 Hypersonic Wind Tunnel Power System Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schneider, Larry X.
2015-02-01
This report documents the characterization and analysis of a high current power supply for the building 865 Hypersonic Wind Tunnel at Sandia National Laboratories. The system described in this report became operational in 2013, replacing the original 1968 system which employed an induction voltage regulator. This analysis and testing was completed to help the parent organization understand why an updated and redesigned power system was not delivering adequate power to resistive heater elements in the HWT. This analysis led to an improved understanding of the design and operation of the revised 2013 power supply system and identifies several reasons themore » revised system failed to achieve the performance of the original power supply installation. Design modifications to improve the performance of this system are discussed.« less
Final Report: Assessment of Combined Heat and Power Premium Power Applications in California
DOE Office of Scientific and Technical Information (OSTI.GOV)
Norwood, Zack; Lipman, Tim; Marnay, Chris
2008-09-30
This report analyzes the current economic and environmental performance of combined heat and power (CHP) systems in power interruption intolerant commercial facilities. Through a series of three case studies, key trade-offs are analyzed with regard to the provision of black-out ridethrough capability with the CHP systems and the resutling ability to avoid the need for at least some diesel backup generator capacity located at the case study sites. Each of the selected sites currently have a CHP or combined heating, cooling, and power (CCHP) system in addition to diesel backup generators. In all cases the CHP/CCHP system have a smallmore » fraction of the electrical capacity of the diesel generators. Although none of the selected sites currently have the ability to run the CHP systems as emergency backup power, all could be retrofitted to provide this blackout ride-through capability, and new CHP systems can be installed with this capability. The following three sites/systems were used for this analysis: (1) Sierra Nevada Brewery - Using 1MW of installed Molten Carbonate Fuel Cells operating on a combination of digestor gas (from the beer brewing process) and natural gas, this facility can produce electricty and heat for the brewery and attached bottling plant. The major thermal load on-site is to keep the brewing tanks at appropriate temperatures. (2) NetApp Data Center - Using 1.125 MW of Hess Microgen natural gas fired reciprocating engine-generators, with exhaust gas and jacket water heat recovery attached to over 300 tons of of adsorption chillers, this combined cooling and power system provides electricity and cooling to a data center with a 1,200 kW peak electrical load. (3) Kaiser Permanente Hayward Hospital - With 180kW of Tecogen natural gas fired reciprocating engine-generators this CHP system generates steam for space heating, and hot water for a city hospital. For all sites, similar assumptions are made about the economic and technological constraints of the power generation system. Using the Distributed Energy Resource Customer Adoption Model (DER-CAM) developed at the Lawrence Berkeley National Laboratory, we model three representative scenarios and find the optimal operation scheduling, yearly energy cost, and energy technology investments for each scenario below: Scenario 1 - Diesel generators and CHP/CCHP equipment as installed in the current facility. Scenario 1 represents a baseline forced investment in currently installed energy equipment. Scenario 2 - Existing CHP equipment installed with blackout ride-through capability to replace approximately the same capacity of diesel generators. In Scenario 2 the cost of the replaced diesel units is saved, however additional capital cost for the controls and switchgear for blackout ride-through capability is necessary. Scenario 3 - Fully optimized site analysis, allowing DER-CAM to specify the number of diesel and CHP/CCHP units (with blackout ride-through capability) that should be installed ignoring any constraints on backup generation. Scenario 3 allows DER-CAM to optimize scheduling and number of generation units from the currently available technologies at a particular site. The results of this analysis, using real data to model the optimal schedulding of hypothetical and actual CHP systems for a brewery, data center, and hospital, lead to some interesting conclusions. First, facilities with high heating loads will typically prove to be the most appropriate for CHP installation from a purely economic standpoint. Second, absorption/adsorption cooling systems may only be economically feasible if the technology for these chillers can increase above current best system efficiency. At a coefficient of performance (COP) of 0.8, for instance, an adsorption chiller paired with a natural gas generator with waste heat recovery at a facility with large cooling loads, like a data center, will cost no less on a yearly basis than purchasing electricity and natural gas directly from a utility. Third, at marginal additional cost, if the reliability of CHP systems proves to be at least as high as diesel generators (which we expect to be the case), the CHP system could replace the diesel generator at little or no additional cost. This is true if the thermal to electric (relative) load of those facilities was already high enough to economically justify a CHP system. Last, in terms of greenhouse gas emissions, the modeled CHP and CCHP systems provide some degree of decreased emissions relative to systems with less CHP installed. The emission reduction can be up to 10% in the optimized case (Scenario 3) in the application with the highest relative thermal load, in this case the hospital. Although these results should be qualified because they are only based on the three case studies, the general results and lessons learned are expected to be applicable across a broad range of potential and existing CCHP systems.« less
New Opportunities for Cabled Ocean Observatories
NASA Astrophysics Data System (ADS)
Duennebier, F. K.; Butler, R.; Karl, D. M.; Roger, L. B.
2002-12-01
With the decommissioning of transoceanic telecommunications cables as they become obsolete or uneconomical, there is an opportunity to use these systems for ocean observatories. Two coaxial cables, TPC-1 and HAW-2 are currently in use for observatories, and another, ANZCAN, is scheduled to be used beginning in 2004 to provide a cabled observatory at Station ALOHA, north of Oahu. The ALOHA observatory will provide several Mb/s data rates and about 1 kW of power to experiments installed at Station ALOHA. Sensors can be installed either by wet mateable connection to a junction box on the ocean floor using an ROV, or by acoustic data link to the system. In either case real-time data will be provided to users over the Internet. A Small Experiment Module, to be first installed at the Hawaii-2 Observatory, and later at Station ALOHA, will provide relatively cheap and uncomplicated access to the observatories for relatively simple sensors. Within the next few years, the first electro-optical cables installed in the 1980's will be decommissioned and could be available for scientific use. These cables could provide long "extension cords" (thousands of km) with very high bandwidth and reasonable power to several observatories in remote locations in the ocean. While they could be used in-place, a more exciting scenario is to use cable ships to pick up sections of cable and move them to locations of higher scientific interest. While such moves would not be cheap, the costs would rival the cost of installation and maintenance of a buoyed observatory, with far more bandwidth and power available for science use.
NASA Technical Reports Server (NTRS)
1979-01-01
The objectives, conclusions, and approaches for accomplishing 19 specific design and analysis activities related to the installation of the power extension package (PEP) into the Orbiter cargo bay are described as well as those related to its deployment, extension, and retraction. The proposed cable handling system designed to transmit power from PEP to the Orbiter by way of the shuttle remote manipulator system is described and a preliminary specification for the gimbal assembly, solar array drive is included.
DOE Office of Scientific and Technical Information (OSTI.GOV)
GREENE,G.A.; GUPPY,J.G.
1998-09-01
This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install andmore » make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.« less
Large Scale Integration of Renewable Power Sources into the Vietnamese Power System
NASA Astrophysics Data System (ADS)
Kies, Alexander; Schyska, Bruno; Thanh Viet, Dinh; von Bremen, Lueder; Heinemann, Detlev; Schramm, Stefan
2017-04-01
The Vietnamese Power system is expected to expand considerably in upcoming decades. Power capacities installed are projected to grow from 39 GW in 2015 to 129.5 GW by 2030. Installed wind power capacities are expected to grow to 6 GW (0.8 GW 2015) and solar power capacities to 12 GW (0.85 GW 2015). This goes hand in hand with an increase of the renewable penetration in the power mix from 1.3% from wind and photovoltaics (PV) in 2015 to 5.4% by 2030. The overall potential for wind power in Vietnam is estimated to be around 24 GW. Moreover, the up-scaling of renewable energy sources was formulated as one of the priorized targets of the Vietnamese government in the National Power Development Plan VII. In this work, we investigate the transition of the Vietnamese power system towards high shares of renewables. For this purpose, we jointly optimise the expansion of renewable generation facilities for wind and PV, and the transmission grid within renewable build-up pathways until 2030 and beyond. To simulate the Vietnamese power system and its generation from renewable sources, we use highly spatially and temporally resolved historical weather and load data and the open source modelling toolbox Python for Power System Analysis (PyPSA). We show that the highest potential of renewable generation for wind and PV is observed in southern Vietnam and discuss the resulting need for transmission grid extensions in dependency of the optimal pathway. Furthermore, we show that the smoothing effect of wind power has several considerable beneficial effects and that the Vietnamese hydro power potential can be efficiently used to provide balancing opportunities. This work is part of the R&D Project "Analysis of the Large Scale Integration of Renewable Power into the Future Vietnamese Power System" (GIZ, 2016-2018).
46 CFR 129.360 - Semiconductor-rectifier systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Semiconductor-rectifier systems. 129.360 Section 129.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.360 Semiconductor-rectifier systems. (a) Each...
46 CFR 129.360 - Semiconductor-rectifier systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Semiconductor-rectifier systems. 129.360 Section 129.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.360 Semiconductor-rectifier systems. (a) Each...
46 CFR 129.360 - Semiconductor-rectifier systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Semiconductor-rectifier systems. 129.360 Section 129.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.360 Semiconductor-rectifier systems. (a) Each...
Distribution System Reliability Analysis for Smart Grid Applications
NASA Astrophysics Data System (ADS)
Aljohani, Tawfiq Masad
Reliability of power systems is a key aspect in modern power system planning, design, and operation. The ascendance of the smart grid concept has provided high hopes of developing an intelligent network that is capable of being a self-healing grid, offering the ability to overcome the interruption problems that face the utility and cost it tens of millions in repair and loss. To address its reliability concerns, the power utilities and interested parties have spent extensive amount of time and effort to analyze and study the reliability of the generation and transmission sectors of the power grid. Only recently has attention shifted to be focused on improving the reliability of the distribution network, the connection joint between the power providers and the consumers where most of the electricity problems occur. In this work, we will examine the effect of the smart grid applications in improving the reliability of the power distribution networks. The test system used in conducting this thesis is the IEEE 34 node test feeder, released in 2003 by the Distribution System Analysis Subcommittee of the IEEE Power Engineering Society. The objective is to analyze the feeder for the optimal placement of the automatic switching devices and quantify their proper installation based on the performance of the distribution system. The measures will be the changes in the reliability system indices including SAIDI, SAIFI, and EUE. The goal is to design and simulate the effect of the installation of the Distributed Generators (DGs) on the utility's distribution system and measure the potential improvement of its reliability. The software used in this work is DISREL, which is intelligent power distribution software that is developed by General Reliability Co.
Solar power satellite life-cycle energy recovery consideration
NASA Astrophysics Data System (ADS)
Weingartner, S.; Blumenberg, J.
The construction, in-orbit installation and maintenance of a solar power satellite (SPS) will demand large amounts of energy. As a minimum requirement for an energy effective power satellite it is asked that this amount of energy be recovered. The energy effectiveness in this sense resulting in a positive net energy balance is a prerequisite for cost-effective power satellite. This paper concentrates on life-cycle energy recovery instead on monetary aspects. The trade-offs between various power generation systems (different types of solar cells, solar dynamic), various construction and installation strategies (using terrestrial or extra-terrestrial resources) and the expected/required lifetime of the SPS are reviewed. The presented work is based on a 2-year study performed at the Technical University of Munich. The study showed that the main energy which is needed to make a solar power satellite a reality is required for the production of the solar power components (up to 65%), especially for the solar cell production. Whereas transport into orbit accounts in the order of 20% and the receiving station on earth (rectenna) requires about 15% of the total energy investment. The energetic amortization time, i.e. the time the SPS has to be operational to give back the amount of energy which was needed for its production installation and operation, is about two years.
46 CFR 129.360 - Semiconductor-rectifier systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Semiconductor-rectifier systems. 129.360 Section 129.360... INSTALLATIONS Power Sources and Distribution Systems § 129.360 Semiconductor-rectifier systems. (a) Each semiconductor-rectifier system must have an adequate heat-removal system to prevent overheating. (b) If a...
46 CFR 120.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Semiconductor rectifier systems. 120.360 Section 120.360... INSTALLATION Power Sources and Distribution Systems § 120.360 Semiconductor rectifier systems. (a) Each semiconductor rectifier system must have an adequate heat removal system that prevents overheating. (b) Where a...
46 CFR 129.360 - Semiconductor-rectifier systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Semiconductor-rectifier systems. 129.360 Section 129.360... INSTALLATIONS Power Sources and Distribution Systems § 129.360 Semiconductor-rectifier systems. (a) Each semiconductor-rectifier system must have an adequate heat-removal system to prevent overheating. (b) If a...
46 CFR 120.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Semiconductor rectifier systems. 120.360 Section 120.360... INSTALLATION Power Sources and Distribution Systems § 120.360 Semiconductor rectifier systems. (a) Each semiconductor rectifier system must have an adequate heat removal system that prevents overheating. (b) Where a...
2007-07-19
KENNEDY SPACE CENTER, Fla. -- In the Orbiter Processing Facility bay 3, a crane moves the main bus switching unit that will be installed in Discovery's payload bay. The unit is part of the payload on mission STS-120. A main bus switching unit is used for power distribution, circuit protection and fault isolation on the space station's power system. The units route power to proper locations in the space station, such as from solar arrays through umbilicals into the U.S. Lab. The unit will be installed on the external stowage platform 2 attached to the Quest airlock for temporary storage. Discovery is targeted to launch mission STS-120 no earlier than Oct. 20. Photo credit: NASA/Jim Grossmann
2007-07-19
KENNEDY SPACE CENTER, Fla. -- In the Orbiter Processing Facility bay 3, a crane lifts the main bus switching unit that will be installed in Discovery's payload bay. The unit is part of the payload on mission STS-120. A main bus switching unit is used for power distribution, circuit protection and fault isolation on the space station's power system. The units route power to proper locations in the space station, such as from solar arrays through umbilicals into the U.S. Lab. The unit will be installed on the external stowage platform 2 attached to the Quest airlock for temporary storage. Discovery is targeted to launch mission STS-120 no earlier than Oct. 20. Photo credit: NASA/Jim Grossmann
Power components for the Space Station 20-kHz power distribution system
NASA Technical Reports Server (NTRS)
Renz, David D.
1988-01-01
Since 1984, NASA Lewis Research Center was developing high power, high frequency space power components as part of The Space Station Advanced Development program. The purpose of the Advanced Development program was to accelerate existing component programs to ensure their availability for use on the Space Station. These components include a rotary power transfer device, remote power controllers, remote bus isolators, high power semiconductor, a high power semiconductor package, high frequency-high power cable, high frequency-high power connectors, and high frequency-high power transformers. All the components were developed to the prototype level and will be installed in the Lewis Research Center Space Station power system test bed.
Power components for the space station 20-kHz power distribution system
NASA Technical Reports Server (NTRS)
Renz, David D.
1988-01-01
Since 1984, NASA Lewis Research Center was developing high power, high frequency space power components as part of The Space Station Advanced Development program. The purpose of The Advanced Development program was to accelerate existing component programs to ensure their availability for use on the Space Station. These components include a rotary power transfer device, remote power controllers, remote bus isolators, high power semiconductor, a high power semiconductor package, high frequency-high power cable, high frequency-high power connectors, and high frequency-high power transformers. All the components were developed to the prototype level and will be installed in the Lewis Research Center Space Station power system test bed.
The Logistics Of Installing Pacs In An Existing Medical Center
NASA Astrophysics Data System (ADS)
Saarinen, Allan O.; Goodsitt, Mitchell M.; Loop, John W.
1989-05-01
A largely overlooked issue in the Picture Archiving and Communication Systems (PACS) area is the tremendous amount of site planning activity required to install such a system in an existing medical center. Present PACS equipment requires significant hospital real estate, specialized electrical power, cabling, and environmental controls to operate properly. Marshaling the hospital resources necessary to install PACS equipment requires many different players. The site preparation costs are nontrivial and usually include a number of hidden expenses. This paper summarizes the experience of the University of Washington Department of Radiology in installing an extensive digital imaging network (DIN) and PACS throughout the Department and several clinics in the hospital. The major logistical problems encountered at the University are discussed, a few recommendations are made, and the installation costs are documented. Overall, the University's site preparation costs equalled about seven percent (7%) of the total PACS equipment expenditure at the site.
Grid-Parity Solar Power for Department of Defense Installations
2014-02-01
MW DC. Installed capacity of panels. Capacity of 1 MW DC. Capacity = 998.4 kWp DC. Photovoltaic Peak Capacity ( Power Delivered). PVSyst... Photovoltaic Annual Output ( Power Delivered) The power delivered to Camp Roberts should match or exceed results simulated using the University of Geneva...FINAL REPORT Grid-Parity Solar Power for Department of Defense Installations ESTCP Project EW-201134 FEBRUARY 2014 John Bender
Description of photovoltaic village power systems in the United States and Africa
NASA Technical Reports Server (NTRS)
Ratajczak, A. F.; Bifano, W. J.
1979-01-01
The paper describes the designs, hardware, and installations of NASA photovoltaic power systems in the village of Schuchuli in Arizona and Tangaye in Upper Volta, Africa. The projects were designed to demonstrate that current photovoltaic system technology can provide electrical power for domestic services for small, remote communities. The Schuchuli system has a 3.5 kW peak solar array which provides power for water pumping, a refrigerator for each family, lights, and community washing and sewing machines. The 1.8 kW Tangaye system provides power for pumping, flour milling, and lights in the milling building. Both are stand-alone systems operated by local personnel, and they are monitored by NASA to measure design adequacy and refine future designs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Manually Controlled Emergency Systems Having a Storage Battery or a Diesel Engine or Gas Turbine Driven Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Manually Controlled Emergency Systems Having a Storage Battery or a Diesel Engine or Gas Turbine Driven Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
14 CFR 171.271 - Installation requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... have a reliable source of suitable primary power, either from a power distribution system or locally... communications or reliable communications (at least a landline telephone) from the airport to the nearest Federal... reliable communications (at least a landline telephone) from the airport to the nearest Federal Aviation...
Voltage dips at the terminals of wind power installations
NASA Astrophysics Data System (ADS)
Bollen, Math H. J.; Olguin, Gabriel; Martins, Marcia
2005-07-01
This article gives an overview of the kind of voltage dips that can be expected at the terminals of a wind power installation. The overview is based on the study of those dips at the terminals of industrial installations and provides a guideline for the testing of wind power installations against voltage dips. For voltage dips due to faults, a classification into different types is presented. Five types appear at the terminals of sensitive equipment and thus have to be included when testing the wind power installation against disturbances coming from the grid. A distinction is made between installations connected at transmission level and those connected at distribution level. For the latter the phase angle jump has to be considered. Dips due to other causes (motor, transformer and capacitor switching) are briefly discussed as well as the voltage recovery after a dip. Finally some thoughts are presented on the way in which voltage tolerance requirements should be part of the design process for wind power installations. Copyright
46 CFR 129.315 - Power sources for OSVs of 100 or more gross tons.
Code of Federal Regulations, 2010 CFR
2010-10-01
... VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs... one set must be independent of the main propulsion plant. A generator not independent of the main propulsion plant must comply with § 111.10-4(d) of this chapter. With any one generating set stopped, the...
ERIC Educational Resources Information Center
Peterson, James N.; Hess, Herbert L.
An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…
2000-09-18
An engineer at AeroVironment's Design Development Center in Simi Valley, California, closely inspects a set of silicon solar cells for potential defects. The cells, fabricated by SunPower, Inc., of Sunnyvale, California, are among 64,000 solar cells which have been installed on the Helios Prototype solar-powered aircraft to provide power to its 14 electric motors and operating systems.
2000-09-18
A technician at AeroVironment's Design Development Center in Simi Valley, California, checks a panel of silicon solar cells for conductivity and voltage. The bi-facial cells, fabricated by SunPower, Inc., of Sunnyvale, California, are among 64,000 solar cells which have been installed on the Helios Prototype solar-powered aircraft to provide power to its 14 electric motors and operating systems.
The Recreational Pilot Practical Test Standard for Powered Parachute
DOT National Transportation Integrated Search
1997-06-01
The I-4 Surveillance and Motorist Information System (SMIS) in the Orlando metropolitan area is Florida's largest existing Freeway Management System (FMS). This system was initially installed in 1991 (Phase I) to help support the TravTek ITS Operatio...
Boston Community Energy Study - Zonal Analysis for Urban Microgrids
2016-03-01
ordinarily rural systems that have generation assets such as wind turbines (WTs) [14] or photovoltaic (PV) panels [15] that power loads such as lights and...movers powered by internal combustion engines, diesel engines, microturbines, geothermal systems, hydro systems, or wind turbines ; they also could include...can have on urban areas such as New York City. While flooding and wind damaged or destroyed some of the energy infrastructure, all installed
EPA RE-Powering Mapper Completed Installations
The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated the RE-Powering America's Land Initiative to demonstrate the enormous potential that contaminated lands, landfills, and mine sites provide for developing renewable energy in the United States. Using publically available information, RE-Powering maintains a list of completed renewable energy installations on contaminated sites and landfills. To date, the RE-Powering Initiative has identified 179 renewable energy installations on 171 contaminated lands, landfills, and mine sites, with a cumulative installed capacity of just over 1,124 megawatts (MW) and consistent growth in total installations since the inception of the RE-Powering Initiative. This dataset is current as of April 2016.
Space transportation system options for extended duration and power
NASA Technical Reports Server (NTRS)
Loftus, J. P., Jr.
1979-01-01
A modification kit for the Space Transportation System (STS) Orbiter is proposed to provide more power and mission duration for payloads. The power extension package (PEP) - a flexible-substrate solar array deployed on the Space Shuttle Orbiter remote manipulator system - can provide as much as 29 kW total power for durations of 10 to 48 days. The kit is installed only for those flights which require enhanced power or duration. Modifications to the Orbiter thermal control and life support systems to improve heat balance and to reduce consumables are proposed. The changes consist of repositioning the Orbiter forward radiators and replacing the lithium hydroxide scrubber with a regenerable solid amine.
High flexible Hydropower Generation concepts for future grids
NASA Astrophysics Data System (ADS)
Hell, Johann
2017-04-01
The ongoing changes in electric power generation are resulting in new requirements for the classical generating units. In consequence a paradigm change in operation of power systems is necessary and a new approach in finding solutions is needed. The presented paper is dealing with the new requirements on current and future energy systems with the focus on hydro power generation. A power generation landscape for some European regions is shown and generation and operational flexibility is explained. Based on the requirements from the Transmission System Operator in UK, the transient performance of a Pumped Storage installation is discussed.
1997-07-18
Jet Propulsion Laboratory (JPL) workers prepare the installation cart (atop the platform) for removal of a radioisotope thermoelectric generator (RTG) from the adjacent Cassini spacecraft. This is the second of three RTGs being removed from Cassini after undergoing mechanical and electrical verification tests in the Payload Hazardous Servicing Facility. The third RTG to be removed is in background at left. The three RTGs will then be temporarily stored before being re-installed for flight. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL
Heavy metal contamination from geothermal sources.
Sabadell, J E; Axtmann, R C
1975-01-01
Liquid-dominated hydrothermal reservoirs, which contain saline fluids at high temperatures and pressures, have a significant potential for contamination of the environment by heavy metals. The design of the power conversion cycle in a liquid-dominated geothermal plant is a key factor in determining the impact of the installation. Reinjection of the fluid into the reservoir minimizes heavy metal effluents but is routinely practiced at few installations. Binary power cycles with reinjection would provide even cleaner systems but are not yet ready for commercial application. Vapor-dominated systems, which contain superheated steam, have less potential for contamination but are relatively uncommon. Field data on heavy metal effluents from geothermal plants are sparse and confounded by contributions from "natural" sources such as geysers and hot springs which often exist nearby. Insofar as geothermal power supplies are destined to multiply, much work is required on their environmental effects including those caused by heavy metals. PMID:1227849
Heavy metal contamination from geothermal sources.
Sabadell, J E; Axtmann, R C
1975-12-01
Liquid-dominated hydrothermal reservoirs, which contain saline fluids at high temperatures and pressures, have a significant potential for contamination of the environment by heavy metals. The design of the power conversion cycle in a liquid-dominated geothermal plant is a key factor in determining the impact of the installation. Reinjection of the fluid into the reservoir minimizes heavy metal effluents but is routinely practiced at few installations. Binary power cycles with reinjection would provide even cleaner systems but are not yet ready for commercial application. Vapor-dominated systems, which contain superheated steam, have less potential for contamination but are relatively uncommon. Field data on heavy metal effluents from geothermal plants are sparse and confounded by contributions from "natural" sources such as geysers and hot springs which often exist nearby. Insofar as geothermal power supplies are destined to multiply, much work is required on their environmental effects including those caused by heavy metals.
46 CFR 183.378 - Ungrounded systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Ungrounded systems. 183.378 Section 183.378 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.378 Ungrounded systems. Each ungrounded...
46 CFR 183.378 - Ungrounded systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Ungrounded systems. 183.378 Section 183.378 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.378 Ungrounded systems. Each ungrounded...
NASA Astrophysics Data System (ADS)
Ye, X.; Tang, Q.; Li, T.; Wang, Y. L.; Zhang, X.; Ye, S. Y.
2017-05-01
The wind, photovoltaic and hydro power bundled transmission system attends to become common in Northwest and Southwest of China. To make better use of the power complementary characteristic of different power sources, the installed capacity proportion of wind, photovoltaic and hydro power, and their capacity distribution for each integration node is a significant issue to be solved in power system planning stage. An optimal capacity proportion and capacity distribution model for wind, photovoltaic and hydro power bundled transmission system is proposed here, which considers the power out characteristic of power resources with different type and in different area based on real operation data. The transmission capacity limit of power grid is also considered in this paper. Simulation cases are tested referring to one real regional system in Southwest China for planning level year 2020. The results verify the effectiveness of the model in this paper.
Photovoltaic balance-of-system designs and costs at PVUSA
NASA Astrophysics Data System (ADS)
Reyes, A. B.; Jennings, C.
1995-05-01
This report is one in a series of 1994-1995 PVUSA reports that document PVUSA lessons learned at demonstration sites in California and Texas. During the last 7 years (1988 to 1994), 16 PV systems ranging from 20 kW to 500 kW have been installed. Six 20-kW emerging module technology (EMT) arrays and three turnkey (i.e., vendor designed and integrated) utility-scale systems were procured and installed at PVUSA's main test site in Davis, California. PVUSA host utilities have installed a total of seven EMT arrays and utility-scale systems in their service areas. Additional systems at Davis and host utility sites are planned. One of PVUSA's key objectives is to evaluate the performance, reliability, and cost of PV balance-of-system (BOS). In the procurement stage PVUSA encouraged innovative design to improve upon present practice by reducing maintenance, improving reliability, or lowering manufacturing or construction costs. The project team worked closely with suppliers during the design stage not only to ensure designs met functional and safety specifications, but to provide suggestions for improvement. This report, intended for the photovoltaic (PV) industry and for utility project managers and engineers considering PV plant construction and ownership, documents PVUSA utility-scale system design and cost lessons learned. Complementary PVUSA topical reports document: construction and safety experience; five-year assessment of EMTs; validation of the Kerman 500-kW grid-support PV plant benefits; PVUSA instrumentation and data analysis techniques; procurement, acceptance, and rating practices for PV power plants; experience with power conditioning units and power quality.
Modular Biopower System Providing Combined Heat and Power for DoD Installations
2013-12-01
ISSUES ......................................................................................... 41 8.4 GASIFIER SHELL INTEGRITY...review of DoD installations revealed that 170 of them had access to significant amounts of woody biomass materials within a 25-mile radius and an...DESCRIPTION The technology uses a downdraft gasification process to convert the energy trapped in biomass into a synthesis gas that is cooled, filtered
NASA Technical Reports Server (NTRS)
Reynolds, C. N.
1985-01-01
The preliminary design of advanced technology (1992) prop-fan engines for single-rotation prop-fans, the conceptual design of the entire propulsion system, and an aircraft evaluation of the resultant designs are discussed. Four engine configurations were examined. A two-spool engine with all axial compressors and a three-spool engine with axial/centrifugal compressors were selected. Integrated propulsion systems were designed in conjunction with airframe manufacturers. The design efforts resulted in 12,000 shaft horsepower engines installed in over the installations with in-line and offset gearboxes. The prop-fan powered aircraft used 21 percent less fuel and cost 10 percent less to operate than a similar aircraft powered by turbofan engines with comparable technology.
NASA Astrophysics Data System (ADS)
Rimov, A. A.; Chukanova, T. I.; Trofimov, Yu. V.
2016-12-01
Data on the comparative analysis variants of the quality of power installations (benchmarking) applied in the power industry is systematized. It is shown that the most efficient variant of implementation of the benchmarking technique is the analysis of statistical distributions of the indicators in the composed homogenous group of the uniform power installations. The benchmarking technique aimed at revealing the available reserves on improvement of the reliability and heat efficiency indicators of the power installations of the thermal power plants is developed in the furtherance of this approach. The technique provides a possibility of reliable comparison of the quality of the power installations in their homogenous group limited by the number and adoption of the adequate decision on improving some or other technical characteristics of this power installation. The technique provides structuring of the list of the comparison indicators and internal factors affecting them represented according to the requirements of the sectoral standards and taking into account the price formation characteristics in the Russian power industry. The mentioned structuring ensures traceability of the reasons of deviation of the internal influencing factors from the specified values. The starting point for further detail analysis of the delay of the certain power installation indicators from the best practice expressed in the specific money equivalent is positioning of this power installation on distribution of the key indicator being a convolution of the comparison indicators. The distribution of the key indicator is simulated by the Monte-Carlo method after receiving the actual distributions of the comparison indicators: specific lost profit due to the short supply of electric energy and short delivery of power, specific cost of losses due to the nonoptimal expenditures for repairs, and specific cost of excess fuel equivalent consumption. The quality loss indicators are developed facilitating the analysis of the benchmarking results permitting to represent the quality loss of this power installation in the form of the difference between the actual value of the key indicator or comparison indicator and the best quartile of the existing distribution. The uncertainty of the obtained values of the quality loss indicators was evaluated by transforming the standard uncertainties of the input values into the expanded uncertainties of the output values with the confidence level of 95%. The efficiency of the technique is demonstrated in terms of benchmarking of the main thermal and mechanical equipment of the extraction power-generating units T-250 and power installations of the thermal power plants with the main steam pressure 130 atm.
Davidson, Carolyn; Steinberg, Daniel; Margolis, Robert
2015-02-04
We report that over the past several years, third-party-ownership (TPO) structures for residential photovoltaic (PV) systems have become the predominant ownership model in the US residential market. Under a TPO contract, the PV system host typically makes payments to the third-party owner of the system. Anecdotal evidence suggests that the total TPO contract payments made by the customer can differ significantly from payments in which the system host directly purchases the system. Furthermore, payments can vary depending on TPO contract structure. To date, a paucity of data on TPO contracts has precluded studies evaluating trends in TPO contract cost. Thismore » study relies on a sample of 1113 contracts for residential PV systems installed in 2010–2012 under the California Solar Initiative to evaluate how the timing of payments under a TPO contract impacts the ultimate cost of the system to the customer. Furthermore, we evaluate how the total cost of TPO systems to customers has changed through time, and the degree to which contract costs have tracked trends in the installed costs of a PV system. We find that the structure of the contract and the timing of the payments have financial implications for the customer: (1) power-purchase contracts, on average, cost more than leases, (2) no-money-down contracts are more costly than prepaid contracts, assuming a customer's discount rate is lower than 17% and (3) contracts that include escalator clauses cost more, for both power-purchase agreements and leases, at most plausible discount rates. Additionally, all contract costs exhibit a wide range, and do not parallel trends in installed costs over time.« less
NASA Astrophysics Data System (ADS)
Davidson, Carolyn; Steinberg, Daniel; Margolis, Robert
2015-02-01
Over the past several years, third-party-ownership (TPO) structures for residential photovoltaic (PV) systems have become the predominant ownership model in the US residential market. Under a TPO contract, the PV system host typically makes payments to the third-party owner of the system. Anecdotal evidence suggests that the total TPO contract payments made by the customer can differ significantly from payments in which the system host directly purchases the system. Furthermore, payments can vary depending on TPO contract structure. To date, a paucity of data on TPO contracts has precluded studies evaluating trends in TPO contract cost. This study relies on a sample of 1113 contracts for residential PV systems installed in 2010-2012 under the California Solar Initiative to evaluate how the timing of payments under a TPO contract impacts the ultimate cost of the system to the customer. Furthermore, we evaluate how the total cost of TPO systems to customers has changed through time, and the degree to which contract costs have tracked trends in the installed costs of a PV system. We find that the structure of the contract and the timing of the payments have financial implications for the customer: (1) power-purchase contracts, on average, cost more than leases, (2) no-money-down contracts are more costly than prepaid contracts, assuming a customer’s discount rate is lower than 17% and (3) contracts that include escalator clauses cost more, for both power-purchase agreements and leases, at most plausible discount rates. In addition, all contract costs exhibit a wide range, and do not parallel trends in installed costs over time.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davidson, Carolyn; Steinberg, Daniel; Margolis, Robert
We report that over the past several years, third-party-ownership (TPO) structures for residential photovoltaic (PV) systems have become the predominant ownership model in the US residential market. Under a TPO contract, the PV system host typically makes payments to the third-party owner of the system. Anecdotal evidence suggests that the total TPO contract payments made by the customer can differ significantly from payments in which the system host directly purchases the system. Furthermore, payments can vary depending on TPO contract structure. To date, a paucity of data on TPO contracts has precluded studies evaluating trends in TPO contract cost. Thismore » study relies on a sample of 1113 contracts for residential PV systems installed in 2010–2012 under the California Solar Initiative to evaluate how the timing of payments under a TPO contract impacts the ultimate cost of the system to the customer. Furthermore, we evaluate how the total cost of TPO systems to customers has changed through time, and the degree to which contract costs have tracked trends in the installed costs of a PV system. We find that the structure of the contract and the timing of the payments have financial implications for the customer: (1) power-purchase contracts, on average, cost more than leases, (2) no-money-down contracts are more costly than prepaid contracts, assuming a customer's discount rate is lower than 17% and (3) contracts that include escalator clauses cost more, for both power-purchase agreements and leases, at most plausible discount rates. Additionally, all contract costs exhibit a wide range, and do not parallel trends in installed costs over time.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-14
.... Section X(a): Installation fees for new cabinets with power. 2. Section X(b): Installation fees for... period than the install timeframes. 3. Section X(c): Installation fees for cabinet power related to an order for a new cabinet. 4. Section X(d): Installation fees for cooling fans, perforated floor tiles and...
AGUACLARA: CLEAN WATER FOR SMALL COMMUNITIES
We will systematically evaluate commercially available solar thermal collectors and thermal storage systems for use in residential scale co-generative heat and electrical power systems. Currently, reliable data is unavailable over the range of conditions and installations thes...
ERIC Educational Resources Information Center
Demski, Jennifer
2013-01-01
The University of San Diego (USD) and Point Loma Nazarene University (PLNU) are licensing the sun. Both California schools are generating solar power on campus without having to sink large amounts of capital into equipment and installation. By negotiating power purchasing agreements (PPAs) with Amsolar and Perpetual Energy Systems, respectively,…
14 CFR 171.159 - Installation requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... must have a reliable source of suitable primary power, either from a power distribution system or... by paragraph (e)(1) of this section and reliable communications (at least a landline telephone) from... (2) of this section may be reduced to reliable communications (at least a landline telephone) from...
14 CFR 171.159 - Installation requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... must have a reliable source of suitable primary power, either from a power distribution system or... by paragraph (e)(1) of this section and reliable communications (at least a landline telephone) from... (2) of this section may be reduced to reliable communications (at least a landline telephone) from...
Campo, Xandra; Méndez, Roberto; Embid, Miguel; Ortego, Alberto; Novo, Manuel; Sanz, Javier
2018-05-01
Neutron fields inside and outside the independent spent fuel storage installation of Trillo Nuclear Power Plant are characterized exhaustively in terms of neutron spectra and ambient dose equivalent, measured by Bonner sphere system and LB6411 monitor. Measurements are consistent with storage casks and building shield characteristics, and also with casks distribution inside the building. Outer values at least five times lower than dose limit for free access area are found. Measurements with LB6411 and spectrometer are consistent with each other. Copyright © 2018 Elsevier Ltd. All rights reserved.
47 CFR 15.31 - Measurement standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the installation site, such as perimeter protection systems, carrier current systems, and systems... variation of the input power or the radiated signal level of the fundamental frequency component of the... nominal rated supply voltage. For battery operated equipment, the equipment tests shall be performed using...
NASA Technical Reports Server (NTRS)
Hill, Gerald M.; Evans, Richard K.
2009-01-01
A large-scale, distributed, high-speed data acquisition system (HSDAS) is currently being installed at the Space Power Facility (SPF) at NASA Glenn Research Center s Plum Brook Station in Sandusky, OH. This installation is being done as part of a facility construction project to add Vibro-acoustic Test Capabilities (VTC) to the current thermal-vacuum testing capability of SPF in support of the Orion Project s requirement for Space Environments Testing (SET). The HSDAS architecture is a modular design, which utilizes fully-remotely managed components, enables the system to support multiple test locations with a wide-range of measurement types and a very large system channel count. The architecture of the system is presented along with details on system scalability and measurement verification. In addition, the ability of the system to automate many of its processes such as measurement verification and measurement system analysis is also discussed.
Assessing the Future of Distributed Wind: Opportunities for Behind-the-Meter Projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lantz, Eric; Sigrin, Benjamin; Gleason, Michael
2016-11-01
Wind power is one of the fastest growing sources of new electricity generation in the United States. Cumulative installed capacity was more than 74,000 megawatts (MW) at year-end 2015 and wind power supplied 4.7% of total 2015 U.S. electricity generation. Despite the growth of the wind power industry, the distributed wind market has remained limited. Cumulative installations of distributed wind through 2015 totaled 934 MW. This first-of-a-kind exploratory analysis characterizes the future opportunity for behind-the-meter distributed wind, serving primarily rural or suburban homes, farms, and manufacturing facilities. This work focuses only on the grid-connected, behind-the-meter subset of the broader distributedmore » wind market. We estimate this segment to be approximately half of the 934 MW of total installed distributed wind capacity at year-end 2015. Potential from other distributed wind market segments including systems installed in front of the meter (e.g., community wind) and in remote, off-grid locations is not assessed in this analysis and therefore, would be additive to results presented here. These other distributed wind market segments are not considered in this initial effort because of their relatively unique economic and market attributes.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mather, Barry A; Hodge, Brian S; Cho, Gyu-Jung
Voltage regulation devices have been traditionally installed and utilized to support distribution voltages. Installations of distributed energy resources (DERs) in distribution systems are rapidly increasing, and many of these generation resources have variable and uncertain power output. These generators can significantly change the voltage profile for a feeder; therefore, in the distribution system planning stage of the optimal operation and dispatch of voltage regulation devices, possible high penetrations of DERs should be considered. In this paper, we model the IEEE 34-bus test feeder, including all essential equipment. An optimization method is adopted to determine the optimal siting and operation ofmore » the voltage regulation devices in the presence of distributed solar power generation. Finally, we verify the optimal configuration of the entire system through the optimization and simulation results.« less
10 CFR 434.520 - Speculative buildings.
Code of Federal Regulations, 2014 CFR
2014-01-01
... assumed lighting power allowance. 520.5 HVAC Systems and Equipment. If the HVAC system is not completely... construction of future HVAC systems and equipment. These assumptions shall be documented so that future HVAC... calculate the Design Energy Consumption must be documented so that the future installed lighting systems may...
10 CFR 434.520 - Speculative buildings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... assumed lighting power allowance. 520.5HVAC Systems and Equipment. If the HVAC system is not completely... construction of future HVAC systems and equipment. These assumptions shall be documented so that future HVAC... calculate the Design Energy Consumption must be documented so that the future installed lighting systems may...
10 CFR 434.520 - Speculative buildings.
Code of Federal Regulations, 2011 CFR
2011-01-01
... assumed lighting power allowance. 520.5HVAC Systems and Equipment. If the HVAC system is not completely... construction of future HVAC systems and equipment. These assumptions shall be documented so that future HVAC... calculate the Design Energy Consumption must be documented so that the future installed lighting systems may...
10 CFR 434.520 - Speculative buildings.
Code of Federal Regulations, 2013 CFR
2013-01-01
... assumed lighting power allowance. 520.5HVAC Systems and Equipment. If the HVAC system is not completely... construction of future HVAC systems and equipment. These assumptions shall be documented so that future HVAC... calculate the Design Energy Consumption must be documented so that the future installed lighting systems may...
10 CFR 434.520 - Speculative buildings.
Code of Federal Regulations, 2012 CFR
2012-01-01
... assumed lighting power allowance. 520.5HVAC Systems and Equipment. If the HVAC system is not completely... construction of future HVAC systems and equipment. These assumptions shall be documented so that future HVAC... calculate the Design Energy Consumption must be documented so that the future installed lighting systems may...
NASA Technical Reports Server (NTRS)
Dickinson, R. M.
1978-01-01
The paper examines the possible environmental and societal effects of the construction, installation, and operation of the space end and earth end of the microwave power transmission subsystem that delivers satellite power system (SPS) energy (at about 5 GW per beam) to the power grid on earth. The intervening propagation medium near the earth is also considered. Separate consideration is given to the spacecraft transmitting array, propagation in the ionosphere, and the ground-based rectenna. Radio frequency interference aspects are also discussed.
151-km single-end phase-sensitive optical time-domain reflectometer assisted by optical repeater
NASA Astrophysics Data System (ADS)
Song, Muping; Zhu, Weiji; Xia, Qiaolan; Yin, Cong; Lu, Yan; Wu, Ying; Zhuang, Shouwang
2018-02-01
A phase-sensitive optical time-domain reflectometry (ϕOTDR) system that can detect intrusion over 150 km is presented. The ϕOTDR system uses nonbalanced optical repeaters to extend the sensing distance. The repeater consists of two erbium-doped optical fiber amplifiers (EDFAs) and one Raman amplifier (RA). One EDFA power amplifier amplifies the forward-transmitting pulse, and one EDFA preamplifier is used for the backscattering signal, respectively. The RA helps keeping the power along the fiber stable. The optical repeater is installed at the connection of two adjacent fibers to compensate the power decline due to fiber loss. It is easy to install the repeater midway among the fiber links in the system for longer-distance sensing since there is no need of modifying the original sensing system. The theoretical analysis of the repeater is given to describe its effect on the distributed sensing. In experiments, several ϕOTDR traces show a good agreement with theoretical results. Using the optical repeater, 35-Hz vibration at 151 km is successfully measured with signal-to-noise ratio of 8 dB without extra signal processing.
RTDS-Based Design and Simulation of Distributed P-Q Power Resources in Smart Grid
NASA Astrophysics Data System (ADS)
Taylor, Zachariah David
In this Thesis, we propose to utilize a battery system together with its power electronics interfaces and bidirectional charger as a distributed P-Q resource in power distribution networks. First, we present an optimization-based approach to operate such distributed P-Q resources based on the characteristics of the battery and charger system as well as the features and needs of the power distribution network. Then, we use the RTDS Simulator, which is an industry-standard simulation tool of power systems, to develop two RTDS-based design approaches. The first design is based on an ideal four-quadrant distributed P-Q power resource. The second design is based on a detailed four-quadrant distributed P-Q power resource that is developed using power electronics components. The hardware and power electronics circuitry as well as the control units are explained for the second design. After that, given the two-RTDS designs, we conducted extensive RTDS simulations to assess the performance of the designed distributed P-Q Power Resource in an IEEE 13 bus test system. We observed that the proposed design can noticeably improve the operational performance of the power distribution grid in at least four key aspects: reducing power loss, active power peak load shaving at substation, reactive power peak load shaving at substation, and voltage regulation. We examine these performance measures across three design cases: Case 1: There is no P-Q Power Resource available on the power distribution network. Case 2: The installed P-Q Power Resource only supports active power, i.e., it only utilizes its battery component. Case 3: The installed P-Q Power Resource supports both active and reactive power, i.e., it utilizes both its battery component and its power electronics charger component. In the end, we present insightful interpretations on the simulation results and suggest some future works.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fynan, G.A.; Sload, A.; Adamson, E.J.
This paper presents the successes and lessons learned during recent low NOx burner and SNCR projects on generating units at New England Power`s Salem Harbor Generating Station. The principals involved in the project were New England Power Company, New England Power Service Company, Stone and Webster Engineering Corp. and Deutsche-Babcock Riley Inc. One unit was retrofitted with 16 Riley CCV burners with an OFA system, the other with 12 low NOx burners only. In addition to the burners, a SNCR system was also installed on three units. Since each of the burner systems are interdependent (SNCR was treated separately duringmore » design phases and optimized along with the burner systems), close cooperation during the design stages was essential to ensuring a successful installation, startup and optimization. This paper will present the coordinated effort put forth by each company toward this goal with the hope of assisting others who may be planning a similar effort. A summary of the operating results will also be presented. The up front teamwork and advance planning that went into the design stages of the project resulted in a number of successful outcomes e.g. scanner reliability, properly operating oil supply system, compatibility of burners and burner front oil system with new Burner Management System (BMS), reliable first attempt burner ignition and more. Advance planning facilitated pre-outage work and factored into keeping schedules and budgets on track.« less
Test Results From a Simulated High-Voltage Lunar Power Transmission Line
NASA Technical Reports Server (NTRS)
Birchenough, Arthur; Hervol, David
2008-01-01
The Alternator Test Unit (ATU) in the Lunar Power System Facility (LPSF) located at the NASA Glenn Research Center (GRC) in Cleveland, Ohio was modified to simulate high-voltage transmission capability. The testbed simulated a 1 km transmission cable length from the ATU to the LPSF using resistors and inductors installed between the distribution transformers. Power factor correction circuitry was used to compensate for the reactance of the distribution system to improve the overall power factor. This test demonstrated that a permanent magnet alternator can successfully provide high-frequency ac power to a lunar facility located at a distance.
Test Results from a Simulated High Voltage Lunar Power Transmission Line
NASA Technical Reports Server (NTRS)
Birchenough, Arthur; Hervol, David
2008-01-01
The Alternator Test Unit (ATU) in the Lunar Power System Facility (LPSF) located at the NASA Glenn Research Center (GRC) in Cleveland, OH was modified to simulate high voltage transmission capability. The testbed simulated a 1 km transmission cable length from the ATU to the LPSF using resistors and inductors installed between the distribution transformers. Power factor correction circuitry was used to compensate for the reactance of the distribution system to improve the overall power factor. This test demonstrated that a permanent magnet alternator can successfully provide high frequency AC power to a lunar facility located at a distance.
Issues concerning centralized versus decentralized power deployment
NASA Technical Reports Server (NTRS)
Metcalf, Kenneth J.; Harty, Richard B.; Robin, James F.
1991-01-01
The results of a study of proposed lunar base architectures to identify issues concerning centralized and decentralized power system deployment options are presented. The power system consists of the energy producing system (power plant), the power conditioning components used to convert the generated power into the form desired for transmission, the transmission lines that conduct this power from the power sources to the loads, and the primary power conditioning hardware located at the user end. Three power system architectures, centralized, hybrid, and decentralized, were evaluated during the course of this study. Candidate power sources were characterized with respect to mass and radiator area. Two electrical models were created for each architecture to identify the preferred method of power transmission, dc or ac. Each model allowed the transmission voltage level to be varied at assess the impact on power system mass. The ac power system models also permitted the transmission line configurations and placements to determine the best conductor construction and installation location. Key parameters used to evaluate each configuration were power source and power conditioning component efficiencies, masses, and radiator areas; transmission line masses and operating temperatures; and total system mass.
Training Civil Engineering Enlisted Personnel Past, Present and Future
1989-09-01
engines, 90; diesel fuel injector systems, 60; exciters and alternators, 60; power plant installation, 60; power plant maintenance, 30; power centers, 30...ENGINEERING COURSES AND STUDENTS GRADUATED, MAY-JUNE 1946. Course Titles Weeks’ No. of Length Grads. Diesel Mechanic 8 58 Auto Equipment Mechanic 8 116...134 Power Shovel 105 Crawler Tractor 315 Miscellaneous and Well Driller 87 *Construction Technician 235 Crane Operator 66 * Diesel Mechanic 252
Fuel cells provide a revenue-generating solution to power quality problems
DOE Office of Scientific and Technical Information (OSTI.GOV)
King, J.M. Jr.
Electric power quality and reliability are becoming increasingly important as computers and microprocessors assume a larger role in commercial, health care and industrial buildings and processes. At the same time, constraints on transmission and distribution of power from central stations are making local areas vulnerable to low voltage, load addition limitations, power quality and power reliability problems. Many customers currently utilize some form of premium power in the form of standby generators and/or UPS systems. These include customers where continuous power is required because of health and safety or security reasons (hospitals, nursing homes, places of public assembly, air trafficmore » control, military installations, telecommunications, etc.) These also include customers with industrial or commercial processes which can`t tolerance an interruption of power because of product loss or equipment damage. The paper discusses the use of the PC25 fuel cell power plant for backup and parallel power supplies for critical industrial applications. Several PC25 installations are described: the use of propane in a PC25; the use by rural cooperatives; and a demonstration of PC25 technology using landfill gas.« less
Optimal reactive planning with security constraints
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomas, W.R.; Cheng, D.T.Y.; Dixon, A.M.
1995-12-31
The National Grid Company (NGC) of England and Wales has developed a computer program, SCORPION, to help system planners optimize the location and size of new reactive compensation plant on the transmission system. The reactive power requirements of the NGC system have risen as a result of increased power flows and the shorter timescale on which power stations are commissioned and withdrawn from service. In view of the high costs involved, it is important that reactive compensation be installed as economically as possible, without compromising security. Traditional methods based on iterative use of a load flow program are labor intensivemore » and subjective. SCORPION determines a near-optimal pattern of new reactive sources which are required to satisfy voltage constraints for normal and contingent states of operation of the transmission system. The algorithm processes the system states sequentially, instead of optimizing all of them simultaneously. This allows a large number of system states to be considered with an acceptable run time and computer memory requirement. Installed reactive sources are treated as continuous, rather than discrete, variables. However, the program has a restart facility which enables the user to add realistically sized reactive sources explicitly and thereby work towards a realizable solution to the planning problem.« less
Ultrawide-Bandgap Semiconductors: Research Opportunities and Challenges
2017-02-03
particularly for power electronics applications in hybrid and electric vehicles, power supplies, and photovoltaic ( PV ) inverters. Ultrawide-Bandgap...the one hand, Ga2O3-based optoelectronic devices such as solar -blind DUV photodetectors are expected to be useful for a variety of applications (e.g...system, and which are core components in aircraft, spacecraft, solar photovoltaic installations, electric vehicles, and military systems such as all
18 CFR 367.3060 - Account 306, Leasehold improvements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS... installation of additional facilities in rented offices or buildings to suit tenant's needs, placed in service...
Stroili, M; Pavan, E C; Gorela, M; Kenda, F
2015-08-01
The Technical Services and the Medical Administration of the Hospitals of Trieste have been working for years to ensure the optimal functioning of the Medicine, Surgery, Diagnostics and Research services offered to the Patients and to the University in an 800-bed hospital complex, transforming and innovating the buildings and support installations. We have dedicated special attention to the technologies necessary to guarantee the continuity of the power supply to the electromedical devices, increasingly numerous in highly specialized hospitals. We report our electricity consumption and the power of the generator sets and the UPS and our opinion that their power must be related to the overall consumption of the Hospital, with a reserve margin.
Power quality considerations for nuclear spectroscopy applications: Grounding
NASA Astrophysics Data System (ADS)
García-Hernández, J. M.; Ramírez-Jiménez, F. J.; Mondragón-Contreras, L.; López-Callejas, R.; Torres-Bribiesca, M. A.; Peña-Eguiluz, R.
2013-11-01
Traditionally the electrical installations are designed for supplying power and to assure the personnel safety. In nuclear analysis laboratories, additional issues about grounding also must be considered for proper operation of high resolution nuclear spectroscopy systems. This paper shows the traditional ways of grounding nuclear spectroscopy systems and through different scenarios, it shows the effects on the more sensitive parameter of these systems: the energy resolution, it also proposes the constant monitoring of a power quality parameter as a way to preserve or to improve the resolution of the systems, avoiding the influence of excessive extrinsic noise.
NASA Lewis Research Center photovoltaic application experiments
NASA Technical Reports Server (NTRS)
Ratajczak, A.; Bifano, W.; Martz, J.; Odonnell, P.
1978-01-01
The NASA Lewis Research Center has installed 16 geographically dispersed terrestrial photovoltaic systems as part of the DOE National Photovoltaic Program. Four additional experiments are in progress. Currently, operating systems are powering refrigerators, a highway warning sign, forest lookout towers, remote weather stations, a water chiller and insect survey traps. Experiments in progress include the world's first village power system, an air pollution monitor and seismic sensors. Under a separate activity, funded by the U.S. Agency for International Development, a PV-powered water pump and grain grinder is being prepared for an African village. System descriptions and status are included in this report.
Field Trial on a Rack-mounted DC Power Supply System with 80-Ah Lithium-ion Batteries
NASA Astrophysics Data System (ADS)
Matsushima, Toshio
Using an industrial lithium-ion battery that has higher energy density than conventional valve-regulated lead-acid batteries, a rack-mounted DC-power-supply system was assembled and tested at a base transceiver station (BTS) offering actual services. A nominal output voltage and maximum output current of the system is 53.5V and 20A, respectively. An 80-Ah lithium-ion battery composed of 13 cells connected in series was applied in the system and maintained in a floating charge method. The DC-power-supply system was installed in a 19-inch power rack in the telecommunications equipment box at BTS. The characteristics of the 80Ah lithium-ion battery, specifications of the DC-power-supply system and field-test results were shown in this paper.
Utilization of available skills and materials in fire prevention
NASA Technical Reports Server (NTRS)
Martin, H. W.
1971-01-01
Procedures for installing fire protection systems in large buildings are discussed. Factors considered in the safety management are: (1) distribution of water supply, (2) design and location of exits, (3) emergency power system, and (4) maintenance procedures.
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2014 CFR
2014-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2013 CFR
2013-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2012 CFR
2012-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2011 CFR
2011-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
Learning to build large structures in space
NASA Technical Reports Server (NTRS)
Hagler, T.; Patterson, H. G.; Nathan, C. A.
1977-01-01
The paper examines some of the key technologies and forms of construction know-how that will have to be developed and tested for eventual application to building large structures in space. Construction of a shuttle-tended space construction/demonstration platform would comprehensively demonstrate large structure technology, develop construction capability, and furnish a construction platform for a variety of operational large structures. Completion of this platform would lead to demonstrations of the Satellite Power System (SPS) concept, including microwave transmission, fabrication of 20-m-deep beams, conductor installation, rotary joint installation, and solar blanket installation.
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier...
2003-08-27
KENNEDY SPACE CENTER, FLA. - During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician moves a switch. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”
2003-08-27
KENNEDY SPACE CENTER, FLA. - During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician turns on a switch. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”
Lesson Learned from Technical and Economic Performance Assessment and Benefit Evaluation of CHP-FCS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Makhmalbaf, Atefe; Brooks, Kriston P.; Srivastava, Viraj
2014-08-22
Recent efforts and interest in combined heat and power (CHP) have increased with the momentum provided by the federal government support for penetration of CHP systems. Combined heat and power fuel cell systems (CHP-FCSs) provide consistent electrical power and utilize the heat normally wasted in power generation for useful heating or cooling with lower emissions compared to alternative sources. A recent study investigated the utilization of CHP-FCSs in the range of 5 to 50KWe in various commercial building types and geographic locations. Electricity, heating, and water heating demands were obtained from simulation of the U.S. Department of Energy (DOE) commercialmore » reference building models for various building types. Utility rates, cost of equipment, and system efficiency were used to examine economic payback in different scenarios. As a new technology in the early stages of adoption, CHP-FCSs are more expensive than alternative technologies, and the high capital cost of the CHP-FCSs results in a longer payback period than is typically acceptable for all but early-adopter market segments. However, the installation of these units as on-site power generators also provide several other benefits that make them attractive to building owners and operators. The business case for CHP-FCSs can be made more financially attractive through the provision of government incentives and when installed to support strategic infrastructure, such as military installations or data centers. The results presented in this paper intend to provide policy makers with information to define more customized incentives and tax credits based on a sample of building types and geographic locations in order to attract more business investment in this new technology.« less
Design and installation package for a solar powered pump
NASA Technical Reports Server (NTRS)
1978-01-01
The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.
Modular Seafloor and Water Column Systems for the Ocean Observatories Initiative Cabled Array
NASA Astrophysics Data System (ADS)
Delaney, J. R.; Manalang, D.; Harrington, M.; Tilley, J.; Dosher, J.; Cram, G.; Harkins, G.; McGuire, C.; Waite, P.; McRae, E.; McGinnis, T.; Kenney, M.; Siani, C.; Michel-Hart, N.; Denny, S.; Boget, E.; Kawka, O. E.; Daly, K. L.; Luther, D. S.; Kelley, D. S.; Milcic, M.
2016-02-01
Over the past decade, cabled ocean observatories have become an increasingly important way to collect continuous real-time data at remote subsea locations. This has led to the development of a class of subsea systems designed and built specifically to distribute power and bandwidth among sensing instrumentation on the seafloor and throughout the water column. Such systems are typically powered by shore-based infrastructure and involve networks of fiber optic and electrical cabling that provide real-time data access and control of remotely deployed instrumentation. Several subsea node types were developed and/or adapted for cabled use in order to complete the installation of the largest North American scientific cabled observatory in Oct, 2014. The Ocean Observatories Initiative (OOI) Cabled Array, funded by the US National Science Foundation, consists of a core infrastructure that includes 900 km of fiber optic/electrical cables, seven primary nodes, 18 seafloor junction boxes, three mooring-mounted winched profiling systems, and three wire-crawling profiler systems. In aggregate, the installed infrastructure has 200 dedicated scientific instrument ports (of which 120 are currently assigned), and is capable of further expansion. The installed system has a 25-year design life for reliable, sustained monitoring; and all nodes, profilers and instrument packages are ROV-serviceable. Now in it's second year of operation, the systems that comprise the Cabled Array are providing reliable, 24/7 real-time data collection from deployed instrumentation, and offer a modular and scalable class of subsea systems for ocean observing. This presentation will provide an overview of the observatory-class subsystems of the OOI Cabled Array, focusing on the junction boxes, moorings and profilers that power and communicate with deployed instrumentation.
NASA Astrophysics Data System (ADS)
Moskvin, L. N.; Rakov, V. T.
2015-06-01
The results obtained from testing the secondary-coolant circuit water chemistry of full-scale land-based prototype bench models of vehicular nuclear power installations equipped with water-cooled water-moderated and liquid-metal reactor plants are presented. The influence of copper-containing redox ionexchange resins intended for chemically deoxygenating steam condensate on the working fluid circulation loop's water chemistry is determined. The influence of redox ion-exchange resins on the water chemistry is evaluated by generalizing an array of data obtained in the course of extended monitoring using the methods relating to physicochemical analysis of the quality of condensate-feedwater path media and the methods relating to metallographic analysis of the state of a faulty steam generator's tube system surfaces. The deoxygenating effectiveness of the normal state turbine condensate vacuum deaeration system is experimentally determined. The refusal from applying redox ion-exchange resins in the condensate polishing ion-exchange filters is formulated based on the obtained data on the adverse effect of copper-containing redox ionexchange resins on the condensate-feedwater path water chemistry and based on the data testifying a sufficient effect from using the normal state turbine condensate vacuum deaeration system. Data on long-term operation of the prototype bench model of a vehicular nuclear power installation without subjecting the turbine condensate to chemical deoxygenation are presented.
A practical solar energy heating and cooling system
NASA Technical Reports Server (NTRS)
Oneill, M. J.; Mcdanal, A. J.; Sims, W. H.
1973-01-01
Recent study has concluded that solar-powered residential heating and cooling system is non technically and economically feasible. Proposed system provides space heating, air conditioning, and hot water. Installation costs will be greater than for conventional heating systems, but this difference will eventually be defrayed by very low operating costs.
Solar power satellite—Life-cycle energy recovery considerations
NASA Astrophysics Data System (ADS)
Weingartner, S.; Blumenberg, J.
1995-05-01
The construction, in-orbit installation and maintenance of a solar power satellite (SPS) will demand large amounts of energy. As a minimum requirement for an energy effective power satellite it is asked that this amount of energy be recovered. The energy effectiveness in this sense resulting in a positive net energy balance is a prerequisite for a cost-effective power satellite. This paper concentrates on life-cycle energy recovery instead of monetary aspects. The trade-offs between various power generation systems (different types of solar cells, solar dynamic), various construction and installation strategies (using terrestrial or extra-terrestrial resources) and the expected/required lifetime of the SPS are reviewed. The presented work is based on a 2-year study performed at the Technical University of Munich. The study showed that the main energy which is needed to make a solar power satellite a reality is required for the production of the solar power plant components (up to 65%), especially for the solar cell production. Whereas transport into orbit accounts in the order of 20% and the receiving station on Earth (rectenna) requires in the order of 15% of the total energy investment. The energetic amortization time, i.e. the time the SPS has to be operational to give back the amount of energy which was needed for its production, installation and operation, is in the order of two years.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Colella, Whitney G.; Pilli, Siva Prasad
2015-06-01
The United States (U.S.) Department of Energy (DOE)’s Pacific Northwest National Laboratory (PNNL) is spearheading a program with industry to deploy and independently monitor five kilowatt-electric (kWe) combined heat and power (CHP) fuel cell systems (FCSs) in light commercial buildings. This publication discusses results from PNNL’s research efforts to independently evaluate manufacturer-stated engineering, economic, and environmental performance of these CHP FCSs at installation sites. The analysis was done by developing parameters for economic comparison of CHP installations. Key thermodynamic terms are first defined, followed by an economic analysis using both a standard accounting approach and a management accounting approach. Keymore » economic and environmental performance parameters are evaluated, including (1) the average per unit cost of the CHP FCSs per unit of power, (2) the average per unit cost of the CHP FCSs per unit of energy, (3) the change in greenhouse gas (GHG) and air pollution emissions with a switch from conventional power plants and furnaces to CHP FCSs; (4) the change in GHG mitigation costs from the switch; and (5) the change in human health costs related to air pollution. From the power perspective, the average per unit cost per unit of electrical power is estimated to span a range from $15–19,000/ kilowatt-electric (kWe) (depending on site-specific changes in installation, fuel, and other costs), while the average per unit cost of electrical and heat recovery power varies between $7,000 and $9,000/kW. From the energy perspective, the average per unit cost per unit of electrical energy ranges from $0.38 to $0.46/kilowatt-hour-electric (kWhe), while the average per unit cost per unit of electrical and heat recovery energy varies from $0.18 to $0.23/kWh. These values are calculated from engineering and economic performance data provided by the manufacturer (not independently measured data). The GHG emissions were estimated to decrease by one-third by shifting from a conventional energy system to a CHP FCS system. The GHG mitigation costs were also proportional to the changes in the GHG gas emissions. Human health costs were estimated to decrease significantly with a switch from a conventional system to a CHP FCS system.« less
NASA Astrophysics Data System (ADS)
Hosford, Kyle S.
Clean distributed generation power plants can provide a much needed balance to our energy infrastructure in the future. A high-temperature fuel cell and an absorption chiller can be integrated to create an ideal combined cooling, heat, and power system that is efficient, quiet, fuel flexible, scalable, and environmentally friendly. With few real-world installations of this type, research remains to identify the best integration and operating strategy and to evaluate the economic viability and market potential of this system. This thesis informs and documents the design of a high-temperature fuel cell and absorption chiller demonstration system at a generic office building on the University of California, Irvine (UCI) campus. This work details the extension of prior theoretical work to a financially-viable power purchase agreement (PPA) with regard to system design, equipment sizing, and operating strategy. This work also addresses the metering and monitoring for the system showcase and research and details the development of a MATLAB code to evaluate the economics associated with different equipment selections, building loads, and economic parameters. The series configuration of a high-temperature fuel cell, heat recovery unit, and absorption chiller with chiller exhaust recirculation was identified as the optimal system design for the installation in terms of efficiency, controls, ducting, and cost. The initial economic results show that high-temperature fuel cell and absorption chiller systems are already economically competitive with utility-purchased generation, and a brief case study of a southern California hospital shows that the systems are scalable and viable for larger stationary power applications.
NASA Technical Reports Server (NTRS)
1988-01-01
ARCO Solar manufactures PV Systems tailored to a broad variety of applications. PV arrays are routinely used at remote communications installations to operate large microwave repeaters, TV and radio repeaters rural telephone, and small telemetry systems that monitor environmental conditions. Also used to power agricultural water pumping systems, to provide electricity for isolated villages and medical clinics, for corrosion protection for pipelines and bridges, to power railroad signals, air/sea navigational aids, and for many types of military systems. ARCO is now moving into large scale generation for utilities.
Development of a microprocessor controller for stand-alone photovoltaic power systems
NASA Technical Reports Server (NTRS)
Millner, A. R.; Kaufman, D. L.
1984-01-01
A controller for stand-alone photovoltaic systems has been developed using a low power CMOS microprocessor. It performs battery state of charge estimation, array control, load management, instrumentation, automatic testing, and communications functions. Array control options are sequential subarray switching and maximum power control. A calculator keypad and LCD display provides manual control, fault diagnosis and digital multimeter functions. An RS-232 port provides data logging or remote control capability. A prototype 5 kW unit has been built and tested successfully. The controller is expected to be useful in village photovoltaic power systems, large solar water pumping installations, and other battery management applications.
Design of a seismo-acoustic station for Antarctica.
Contrafatto, Danilo; Fasone, Rosario; Ferro, Angelo; Larocca, Graziano; Laudani, Giuseppe; Rapisarda, Salvatore; Scuderi, Luciano; Zuccarello, Luciano; Privitera, Eugenio; Cannata, Andrea
2018-04-01
In recent years, seismological studies in Antarctica have contributed plenty of new knowledge in many fields of earth science. Moreover, acoustic investigations are now also considered a powerful tool that provides insights for many different objectives, such as analyses of regional climate-related changes and studies of volcanic degassing and explosive activities. However, installation and maintenance of scientific instrumentation in Antarctica can be really challenging. Indeed, the instruments have to face the most extreme climate on the planet. They must be tolerant of very low temperatures and robust enough to survive strong winds. Moreover, one of the most critical tasks is powering a remote system year-round at polar latitudes. In this work, we present a novel seismo-acoustic station designed to work reliably in polar regions. To enable year-round seismo-acoustic data collection in such a remote, extreme environment, a hybrid powering system is used, integrating solar panels, a wind generator, and batteries. A power management system was specifically developed to either charge the battery bank or divert energy surplus to warm the enclosure or release the excess energy to the outside environment. Finally, due to the prohibitive environmental conditions at most Antarctic installation sites, the station was designed to be deployed quickly.
Design of a seismo-acoustic station for Antarctica
NASA Astrophysics Data System (ADS)
Contrafatto, Danilo; Fasone, Rosario; Ferro, Angelo; Larocca, Graziano; Laudani, Giuseppe; Rapisarda, Salvatore; Scuderi, Luciano; Zuccarello, Luciano; Privitera, Eugenio; Cannata, Andrea
2018-04-01
In recent years, seismological studies in Antarctica have contributed plenty of new knowledge in many fields of earth science. Moreover, acoustic investigations are now also considered a powerful tool that provides insights for many different objectives, such as analyses of regional climate-related changes and studies of volcanic degassing and explosive activities. However, installation and maintenance of scientific instrumentation in Antarctica can be really challenging. Indeed, the instruments have to face the most extreme climate on the planet. They must be tolerant of very low temperatures and robust enough to survive strong winds. Moreover, one of the most critical tasks is powering a remote system year-round at polar latitudes. In this work, we present a novel seismo-acoustic station designed to work reliably in polar regions. To enable year-round seismo-acoustic data collection in such a remote, extreme environment, a hybrid powering system is used, integrating solar panels, a wind generator, and batteries. A power management system was specifically developed to either charge the battery bank or divert energy surplus to warm the enclosure or release the excess energy to the outside environment. Finally, due to the prohibitive environmental conditions at most Antarctic installation sites, the station was designed to be deployed quickly.
46 CFR 169.673 - Installation of wiring for power and lighting circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.673 Installation of wiring for...
46 CFR 120.330 - Distribution panels and switchboards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... INSTALLATION Power Sources and Distribution Systems § 120.330 Distribution panels and switchboards. (a) Each... vessel's wiring, must not have electrically unshielded or uninsulated surfaces. (k) Switchboards and...
46 CFR 183.330 - Distribution panels and switchboards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.330... vessel's wiring, must not have any electrically unshielded or uninsulated surfaces. (j) Switchboards and...
Thermoelectric generator installation at Divide Road Weather Information Systems (RWIS).
DOT National Transportation Integrated Search
2016-04-13
The Department of Transportation and Public Facilities (DOT&PF) has a network of Road Weather Information System (RWIS) environmental sensor stations (ESS) deployed along the road network. Six of the stations do not have access to commercial power an...
10 CFR 205.352 - Information to be reported.
Code of Federal Regulations, 2014 CFR
2014-01-01
... DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Report of Major Electric Utility System Emergencies § 205... involved; and whether any known critical services such as hospitals, military installations, pumping...
10 CFR 205.352 - Information to be reported.
Code of Federal Regulations, 2013 CFR
2013-01-01
... DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Report of Major Electric Utility System Emergencies § 205... involved; and whether any known critical services such as hospitals, military installations, pumping...
10 CFR 205.352 - Information to be reported.
Code of Federal Regulations, 2012 CFR
2012-01-01
... DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Report of Major Electric Utility System Emergencies § 205... involved; and whether any known critical services such as hospitals, military installations, pumping...
10 CFR 205.352 - Information to be reported.
Code of Federal Regulations, 2011 CFR
2011-01-01
... DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Report of Major Electric Utility System Emergencies § 205... involved; and whether any known critical services such as hospitals, military installations, pumping...
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2013 CFR
2013-10-01
...); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning costs; training... upgrades for interference control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
NASA Astrophysics Data System (ADS)
Krokhin, G.; Pestunov, A.; Arakelyan, E.; Mukhin, V.
2017-11-01
During the last decades, there can be noticed an increase of interest concerning various aspects of intellectual diagnostics and management in thermal power engineering according the hybrid principle. It is conditioned by the fact that conservative static methods does not allow to reflect the actual power installation state adequately. In order to improve the diagnostics quality, we use various fuzzy systems apparatus. In this paper, we introduce the intellectual system, called SKAIS, which is intended for quick and precise diagnostics of thermal power equipment. This system was developed as the result of the research carried out by specialists from National Research University “Moscow Power Engineering Institute” and Novosibirsk State University of Economics and Management. It drastically increases the level of intelligence of the automatic power plant control system.
The Evaluation of Feasibility of Thermal Energy Storage System at Riga TPP-2
NASA Astrophysics Data System (ADS)
Ivanova, P.; Linkevics, O.; Cers, A.
2015-12-01
The installation of thermal energy storage system (TES) provides the optimisation of energy source, energy security supply, power plant operation and energy production flexibility. The aim of the present research is to evaluate the feasibility of thermal energy system installation at Riga TPP-2. The six modes were investigated: four for non-heating periods and two for heating periods. Different research methods were used: data statistic processing, data analysis, analogy, forecasting, financial method and correlation and regression method. In the end, the best mode was chosen - the increase of cogeneration unit efficiency during the summer.
View northeast of a microchip based computer control system installed ...
View northeast of a microchip based computer control system installed in the early 1980's to replace Lamokin Tower, at center of photograph; panels 1 and 2 at right of photograph are part of main supervisory board; panel 1 controlled Allen Lane sub-station #7; responsiblity for this portion of the system was transferred to southeast Pennsylvania transit authority (septa) in 1985; panel 2 at extreme right controls catenary switches in a coach storage yard adjacent to the station - Thirtieth Street Station, Power Director Center, Thirtieth & Market Streets in Amtrak Railroad Station, Philadelphia, Philadelphia County, PA
Smoothing PV System’s Output by Tuning MPPT Control
NASA Astrophysics Data System (ADS)
Ina, Nobuhiko; Yanagawa, Shigeyuki; Kato, Takeyoshi; Suzuoki, Yasuo
A PV system’s output is not stable and fluctuates depending on a weather condition. Using a battery is one of the feasible ways to stabilize a PV system’s output, although it requires an additional cost and provides an additional waste of the used battery. In this paper, we propose tuning a characteristic of Maxiumum Power Point Tracking (MPPT) control for smoothing a short term change of PV system’s output during a sharp insolation fluctuation, as an approach without additional equipments. In our proposed method, when an insolation increases rapidly, the operation point of MPPT control changes to the new point where the maximum power is not generated with present insolation, so that the speed of PV system’s output increase is limited to a certain value, i. e. 1%/min. In order to evaluate the effect of our proposed method in terms of reducing the additional operation task of the electric power system, we evaluated the additional LFC capacity for a large-scale installation of PV systems. As a result, it was revealed that the additional LFC capacity is not required even if a PV system is installed by 5% of utility system, when our proposed method is applied to all PV systems.
The dark side of photovoltaic — 3D simulation of glare assessing risk and discomfort
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rose, Thomas; Wollert, Alexander
2015-04-15
Photovoltaic (PV) systems form an important force in the implementation of renewable energies, but as we all know, the force has always its dark side. Besides efficiency considerations and discussions about architectures of power distribution networks, the increasing numbers of installations of PV systems for implementing renewable energies have secondary effects. PV systems can generate glare due to optical reflections and hence might be a serious concern. On the one hand, glare could affect safety, e.g. regarding traffic. On the other hand, glare is a constant source of discomfort in vicinities of PV systems. Hence, assessment of glare is decisivemore » for the success of renewable energies near municipalities and traffic zones for the success of solar power. Several courts decided on the change of PV systems and even on their de-installation because of glare effects. Thus, location-based assessments are required to limit potential reflections and to avoid risks for public infrastructure or discomfort of residents. The question arises on how to calculate reflections accurately according to the environment's topography. Our approach is founded in a 3D-based simulation methodology to calculate and visualize reflections based on the geometry of the environment of PV systems. This computational model is implemented by an interactive tool for simulation and visualization. Hence, project planners receive flexible assistance for adjusting the parameters of solar panels amid the planning process and in particular before the installation of a PV system. - Highlights: • Solar panels cause glare that impacts neighborhoods and traffic infrastructures. • Glare might cause disability and discomfort. • 3D environment for the calculation of glare • Interactive tool to simulate and visualize reflections • Impact assessment of solar power plant farms.« less
Development of a high power Helicon system for DIII-D
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tooker, Joseph F.; Nagy, Alexander; deGrassie, John
A mechanism for driving current off-axis in high beta tokamaks using fast electromagnetic waves, called Helicons, will be experimentally tested in the DIII-D tokamak. This method is calculated to be more efficient than current drive using electron cyclotron waves or neutral beam injection, and it may be well suited to reactor-like configurations. A low power (100 W) 476 MHz “combline” antenna, consisting of 12 inductively coupled, electrostatically shielded, modular resonators, was recently installed in DIII-D. Initial operation showed that the plasma operating conditions were achieved under which helicon waves can be launched. Plasma operations also showed that the location ofmore » the antenna has not reduced the performance of, or introduced excessive impurities into, the discharges produced in DIII-D. The development of a high power (1 MW) Helicon system is underway. This antenna consists of 30 modules mounted on the inside of the outer wall of the vacuum vessel slightly above the midplane. Carbon tiles around the antenna protect the antenna from thermal plasma streaming along field lines. A 1.2 MW, 476 MHz klystron system will be transferred from the Stanford Linear Accelerator to DIII-D to provide the RF input power to the antenna. Lastly, a description of the design and fabrication of high power antenna and the RF feeds, the klystron and RF distribution systems, and their installation will be presented.« less
Development of a high power Helicon system for DIII-D
Tooker, Joseph F.; Nagy, Alexander; deGrassie, John; ...
2017-03-29
A mechanism for driving current off-axis in high beta tokamaks using fast electromagnetic waves, called Helicons, will be experimentally tested in the DIII-D tokamak. This method is calculated to be more efficient than current drive using electron cyclotron waves or neutral beam injection, and it may be well suited to reactor-like configurations. A low power (100 W) 476 MHz “combline” antenna, consisting of 12 inductively coupled, electrostatically shielded, modular resonators, was recently installed in DIII-D. Initial operation showed that the plasma operating conditions were achieved under which helicon waves can be launched. Plasma operations also showed that the location ofmore » the antenna has not reduced the performance of, or introduced excessive impurities into, the discharges produced in DIII-D. The development of a high power (1 MW) Helicon system is underway. This antenna consists of 30 modules mounted on the inside of the outer wall of the vacuum vessel slightly above the midplane. Carbon tiles around the antenna protect the antenna from thermal plasma streaming along field lines. A 1.2 MW, 476 MHz klystron system will be transferred from the Stanford Linear Accelerator to DIII-D to provide the RF input power to the antenna. Lastly, a description of the design and fabrication of high power antenna and the RF feeds, the klystron and RF distribution systems, and their installation will be presented.« less
Description and status of NASA-LeRC/DOE photovoltaic applications systems
NASA Technical Reports Server (NTRS)
Ratajczak, A. F.
1978-01-01
Designed, fabricated and installed were 16 geographically dispersed photovoltaic systems. These systems are powering a refrigerator, highway warning sign, forest lookout towers, remote weather stations, a water chiller at a visitor center, and insect survey traps. Each of these systems is described in terms of load requirements, solar array and battery size, and instrumentation and controls. Operational experience is described and present status is given for each system. The P/V power systems have proven to be highly reliable with almost no problems with modules and very few problems overall.
Land-use efficiency of big solar.
Hernandez, Rebecca R; Hoffacker, Madison K; Field, Christopher B
2014-01-21
As utility-scale solar energy (USSE) systems increase in size and numbers globally, there is a growing interest in understanding environmental interactions between solar energy development and land-use decisions. Maximizing the efficient use of land for USSE is one of the major challenges in realizing the full potential of solar energy; however, the land-use efficiency (LUE; Wm(-2)) of USSE remains ambiguous. We quantified the capacity-based LUE of 183 USSE installations (>20 MW; planned, under construction, and operating) using California as a case study. In California, USSE installations are concentrated in the Central Valley and interior regions of southern California and have a LUE of 35.0 Wm(-2). The installations occupy approximately 86,000 ha and more land is allocated for photovoltaic schemes (72 294 ha) than for concentrating solar power (13,604 ha). Photovoltaic installations are greater in abundance (93%) than concentrating solar power, but technology type and nameplate capacity has no impact on capacity-based LUE. More USSE installations are on private land (80%) and have a significantly greater LUE (35.8 Wm(-2)) than installations on public land (25.4 Wm(-2)). Our findings can be used to better understand and improve the LUE of USSE, thereby maximizing economic, energetic, and environmental returns on investments.
NASA Astrophysics Data System (ADS)
Shishido, Seiji; Takahashi, Rion; Murata, Toshiaki; Tamura, Junji; Sugimasa, Masatoshi; Komura, Akiyoshi; Futami, Motoo; Ichinose, Masaya; Ide, Kazumasa
The spread of wind power generation is progressed hugely in recent years from a viewpoint of environmental problems including global warming. Though wind power is considered as a very prospective energy source, wind power fluctuation due to the random fluctuation of wind speed has still created some problems. Therefore, research has been performed how to smooth the wind power fluctuation. This paper proposes Energy Capacitor System (ECS) for the smoothing of wind power which consists of Electric Double-Layer Capacitor (EDLC) and power electronics devices and works as an electric power storage system. Moreover, hydrogen has received much attention in recent years from a viewpoint of exhaustion problem of fossil fuel. Therefore it is also proposed that a hydrogen generator is installed at the wind farm to generate hydrogen. In this paper, the effectiveness of the proposed system is verified by the simulation analyses using PSCAD/EMTDC.
NASA Astrophysics Data System (ADS)
Nielsen, T. K.; Kjeldsen, M.
2010-08-01
Many Norwegian hydro power plants have complex lay-out with several reservoirs, broke intakes, surge shafts and even air cushion chambers. There are kilometers of excavated tunnels as well as long tail water systems. The stations are often equipped by multiple of turbines, both in series and parallel. A number of operation modes are therefore possible. Doing transient simulations and simulations of governor stability in the design phase, the problem is to find the worst case scenario regarding these operating modes. Svartisen power plant has been of particular interest these days. The power plant is originally designed for two 350 MW Francis turbines, however, only one turbine was installed. When designed, governor stability was regarded as problematic due to the long penstock. A long penstock will give a too high time constant for the hydraulic inertia. The main problem here is, however, the water hammer frequency that interferes with the governor performance. The frequency is in the same range as the cross frequency. Therefore the governor will react on these water hammer waves, which in its nature is notoriously unstable. The common solution is to build an air cushion and thereby increase the water hammer frequency above the cross frequency. The expenses were, however, deemed too high, and it was necessary to seek for other solutions. A pressure feedback on the governor was introduced in order to have stable operation at least for two turbines. With only one turbine installed, the pressure feedback has not been activated because, based on the simulations, it was regarded unnecessary. Even if the original simulations shows good stability margins when only one turbine is running, there has been some indications that the aggregate has suffered from instability. In 2004 Svartisen Power Plant was equipped with a comprehensive monitoring system. Both the turbine and the generator performance have been observed. This gives valuable information on how the hydropower plant has performed during start ups, close downs and steady state operation. The data has for instance been used to verify the simulations of governor stability of the excising turbine.This will also secure the simulations done with an additional turbine installed.
USDOE/Russian Ministry of Fuel and Energy joint collaboration for renewable energy resources
DOE Office of Scientific and Technical Information (OSTI.GOV)
Touryan, K.
1997-12-01
This paper describes a joint collaboration between the US and Russia to develop renewable energy resources. There are five main goals of the project. First is to establish Intersolarcenter as a sister organization to NREL for joint R&D activities, and to provide training to the staff. Second is to install demonstration systems in parks and selected locations around Moscow. Third is to install pilot projects: a wind/diesel hybrid system at 21 sites in the northern territories; a 500 kW biomass power plant in the Arkhangelsk Region. Fourth is to assist in the start-up operations of a 2 MW/yr Triple Junctionmore » amorphous-Si manufacturing facility in Moscow using US technology. Fifth is to explore the possibilities of financing large-scale wind/hybrid and biomass power systems for the nouthern territories (possibly 900 sites).« less
Massey, J K
1979-01-01
The increasing usage of electronic instruments in health care systems invariably leads to some level of dependence on them. In order to maximize the utility of these tools a high degree of reliability is essential. Many of the failures being experienced in systems where electronic instruments are being utilized may be attributed not to a failure of the instrument itself but rather to the poor quality of the commercial power to which they are attached. In order to reduce the effects of power fluctuations and outages, some type of power protection equipment must be installed between the commercial power system and the instrument. This article discusses the types of "electronic noise" present on commercial power lines and the various types of equipment used to reduce its effect on electronic instrumentation. In general, the Uninterruptible Power System (UPS) is shown to be the most effective power buffering element for a health care environment. General terminology associated with specifications of a UPS is defined in the article and attached appendix.
Power quality improvement of a stand-alone power system subjected to various disturbances
NASA Astrophysics Data System (ADS)
Lone, Shameem Ahmad; Mufti, Mairaj Ud-Din
In wind-diesel stand-alone power systems, the disturbances like random nature of wind power, turbulent wind, sudden changes in load demand and the wind park disconnection effect continuously the system voltage and frequency. The satisfactory operation of such a system is not an easy task and the control design has to take in to account all these subtleties. For maintaining the power quality, generally, a short-term energy storage device is used. In this paper, the performance of a wind-diesel system associated with a superconducting magnetic energy storage (SMES) system is studied. The effect of installing SMES at wind park bus/load bus, on the system performance is investigated. To control the exchange of real and reactive powers between the SMES unit and the wind-diesel system, a control strategy based on fuzzy logic is proposed. The dynamic models of the hybrid power system for most common scenarios are developed and the results presented.
Real-time ground motions monitoring system developed by Raspberry Pi 3
NASA Astrophysics Data System (ADS)
Chen, P.; Jang, J. P.; Chang, H.; Lin, C. R.; Lin, P. P.; Wang, C. C.
2016-12-01
Ground-motions seismic stations are usually installed in the special geological area, like high possibility landslide area, active volcanoes, or nearby faults, to real-time monitor the possible geo-hazards. Base on the demands, three main issues needs to be considered: size, low-power consumption and real-time data transmission. Raspberry Pi 3 has the suitable characteristics to fit our requests. Thus, we develop a real-time ground motions monitoring system by Raspberry Pi 3. The Raspberry Pi has the credit-card-sized with single-board computers. The operating system is based on the programmable Linux system.The volume is only 85.6 by 53.98 by 17 mm with USB and Ethernet interfaces. The power supply is only needed 5 Volts and 2.1 A. It is easy to get power by using solar power and transmit the real-time data through Ethernet or by the mobile signal through USB adapter. As Raspberry Pi still a kind of small computer, the service, software or GUI can be very flexibly developed, such as the basic web server, ftp server, SSH connection, and real-time visualization interface tool etc. Until now, we have developed ten instruments with on-line/ real-time data transmission and have installed in the Taiping Mountain in Taiwan to motor the geohazard like mudslide.
Home Photovoltaic System Design in Pangkalpinang City
NASA Astrophysics Data System (ADS)
Sunanda, Wahri
2018-02-01
This research aims to obtain the design of home photovoltaic systems in Pangkalpinang and the opportunity of economic savings. The system consists of photovoltaic with batteries. Based on electricity consumption of several houses with installed power of 1300 VA and 2200 VA in Pangkalpinang for one year, the daily load of photovoltaic system is varied to 40%, 30% and 20% of the average value of the daily home electricity consumption. The investment costs, the cost of replacement parts and the cost of electricity consumption accrued to PLN during lifetime of systems (25 years) are also calculated. The result provided that there are no economic saving opportunities for photovoltaic systems with batteries at home with installed power of 1300 VA and 2200 VA in Pangkalpinang. The most economical is the photovoltaic system with the daily load of 20% of the average value of the daily home electricity consumption. The configuration of photovoltaic system for 1300 VA home consists of 10 modules of 200 wattpeak and 4 batteries 150 AH, 12 Volt while photovoltaic system for 2200 VA home consists of 15 modules of 200 wattpeak and 6 batteries 150 AH,12Volt.
Feasibility of AN Ecrh System for Jet:. Plant Layout, Auxiliaries and Services
NASA Astrophysics Data System (ADS)
Lennholm, M.; Bouquey, F.; Braune, H.; Farthing, J.; Garavaglia, S.; Giruzzi, G.; Granucci, G.; Jennison, M.; Parkin, A.
2011-02-01
A study conducted over the last year to asses the desirability and feasibility of installing an ECRH system on the JET tokamak has concluded that such a system is indeed both desirable and feasible. Details of physics studies, launcher and transmission line design, and power supplies are presented elsewhere in these proceedings. This paper concentrates on the logistical implications of installing this system at JET. The paper addresses issues such as port allocation and plant location. The study has concluded that a new building will be needed to house the ECRH plant. Building layout proposals are presented together with considerations regarding the required auxiliary equipment.
43. VIEW OF TURBINE HALL LOOKING WEST NORTHWEST FROM THE ...
43. VIEW OF TURBINE HALL LOOKING WEST NORTHWEST FROM THE MEZZANINE. IN THE CENTER OF THE PHOTOGRAPHS ARE THREE FREQUENCY CONVERTERS INSTALLED IN 1983. THE FREQUENCY CONVERTERS SUPPLEMENTED COS COB POWER. DURING THE TRANSITION TO UTILITY POWER CONVERTERS USED UTILITY INPUT POWER AT 60 CYCLES TO OUTPUT 25 CYCLE POWER FOR RAILROAD OPERATIONS. THE INTERIM SYSTEM INCREASED RELIABILITY AND ALLOWED COMPLIANCE WITH BOILER EMISSION LIMITATIONS. - New York, New Haven & Hartford Railroad, Cos Cob Power Plant, Sound Shore Drive, Greenwich, Fairfield County, CT
PERFORMANCE OF SOLAR HOT WATER COLLECTORS FOR ELECTRICITY PRODUCTION AND CLIMATE CONTROL
We will systematically evaluate commercially available solar thermal collectors and thermal storage systems for use in residential scale co-generative heat and electrical power systems. Currently, reliable data is unavailable over the range of conditions and installations thes...
30 CFR 75.1101-5 - Installation of foam generator systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... (b) Foam generator systems shall be equipped with a fire sensor which actuates the system, and each.... (d) Water, power, and chemicals required shall be adequate to maintain water or foam flow for no less than 25 minutes. (e) Water systems shall include strainers with a flush-out connection and a manual...
Update on Geothermal Direct-Use Installations in the United States
Beckers, Koenraad F.; Snyder, Diana M.; Young, Katherine R.
2017-03-02
An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of direct-use applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others; power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. A report is also included which details and analyzes current geothermal direct-use installations and barriers to further implementation.
46 CFR 129.320 - Generators and motors.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.320 Generators and motors. (a) Each generator and... windings, if DC; (7) When intended for connection in a normally grounded configuration, the grounding...
Natural Bridges National Monument photovoltaic power plant operations manual
NASA Astrophysics Data System (ADS)
Coleman, S. D.
1982-02-01
After a basic introduction and overview of the photovoltaic system at the Natural Bridges National Monument, a history of the project and a description of the installation, safety procedures essential for all operators and maintenance personnel are discussed. Locations and detailed descriptions of the equipment are provided to permit operators to identify the system controls and equipment. Step by step system operation procedures are described, including diesel generator start up and photovoltaic power system turn on. Information is provided about routine monitoring and maintenance of the system.
Demonstration of a Variable Phase Turbine Power System for Low Temperature Geothermal Resources
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, Lance G
2014-07-07
A variable phase turbine assembly will be designed and manufactured having a turbine, operable with transcritical, two-phase or vapor flow, and a generator – on the same shaft supported by process lubricated bearings. The assembly will be hermetically sealed and the generator cooled by the refrigerant. A compact plate-fin heat exchanger or tube and shell heat exchanger will be used to transfer heat from the geothermal fluid to the refrigerant. The demonstration turbine will be operated separately with two-phase flow and with vapor flow to demonstrate performance and applicability to the entire range of low temperature geothermal resources. The vapormore » leaving the turbine is condensed in a plate-fin refrigerant condenser. The heat exchanger, variable phase turbine assembly and condenser are all mounted on single skids to enable factory assembly and checkout and minimize installation costs. The system will be demonstrated using low temperature (237F) well flow from an existing large geothermal field. The net power generated, 1 megawatt, will be fed into the existing power system at the demonstration site. The system will demonstrate reliable generation of inexpensive power from low temperature resources. The system will be designed for mass manufacturing and factory assembly and should cost less than $1,200/kWe installed, when manufactured in large quantities. The estimated cost of power for 300F resources is predicted to be less than 5 cents/kWh. This should enable a substantial increase in power generated from low temperature geothermal resources.« less
NASA Astrophysics Data System (ADS)
Ramirez Camargo, Luis; Dorner, Wolfgang
2016-04-01
The yearly cumulated technical energy generation potential of grid-connected roof-top photovoltaic power plants is significantly larger than the demand of domestic buildings in sparsely populated municipalities in central Europe. However, an energy balance with cumulated annual values does not deliver the right picture about the actual potential for photovoltaics since these run on a highly variable energy source as solar radiation. The mismatch between the periods of generation and demand creates hard limitations for the deployment of the theoretical energy generation potential of roof-top photovoltaics. The actual penetration of roof-top photovoltaic is restricted by the energy quality requirements of the grid and/or the available storage capacity for the electricity production beyond the coverage of own demands. In this study we evaluate in how far small-scale storage systems can contribute to increment the grid-connected roof-top photovoltaic penetration in domestic buildings at a municipal scale. To accomplish this, we calculate, in a first step, the total technical roof-top photovoltaic energy generation potential of a municipality in a high spatiotemporal resolution using a procedure that relies on geographic information systems. Posteriorly, we constrain the set of potential photovoltaic plants to the ones that would be necessary to cover the total yearly demand of the municipality. We assume that photovoltaic plants with the highest yearly yield are the ones that should be installed. For this sub-set of photovoltaic plants we consider five scenarios: 1) no storage 2) one 7 kWh battery is installed in every building with a roof-top photovoltaic plant 3) one 10 kWh battery is installed in every building with a roof-top photovoltaic plant 4) one 7 kWh battery is installed in every domestic building in the municipality 5) one 10 kWh battery is installed in every domestic building in the municipality. Afterwards we evaluate the energy balance of the municipality using a series of indicators. These indicators include: a) the total photovoltaic installed capacity, b) the total storage installed capacity, c) the output variability, d) the total unfulfilled demand, e) total excess energy, f) total properly supplied energy, g) the loss of power supply probability, h) the amount of hours of supply higher than the highest demand in a year, i) the number of hours, when supply is 1.5. times higher than the highest demand in a year, and j) the additional storage energy capacity and power required to store all excess energy generated by the photovoltaic installations. The comparison of the proposed indicators serves to quantify the contribution that household-sized small-scale storage systems would make to the energy balance of the studied municipality. Increased installed energy storage capacity allows a higher roof-top photovoltaic share and improves energy utilization, variability and reliability indicators. The proposed methodology serves also to determine the amount of storage capacity with the highest positive impact on the local energy balance.
Fabrication and installation of the Solar Two central receiver
DOE Office of Scientific and Technical Information (OSTI.GOV)
Litwin, R.Z.; Rogers, R.D.
The heart of the Solar Two power plant is the molten salt central receiver that has been designed, fabricated, and installed over an 18 month schedule. During this time, the receiver system from Solar One was also completely disassembled and removed. The receiver tower structure, for the most part, was left intact because Solar Two was designed to fit this structure such that construction time and costs could be minimized. In order to meet this aggressive schedule, receiver panel fabrication required the parallel production of many components. The sequence for assembly of the four major receiver panel components (i.e., tubes,more » header assembly, strongback, and header oven covers) and key fabrication activities such as welding are described. Once the receiver panels were complete, their installation at the site was begun, and the order in which receiver system components were installed in the tower is described. The completion of the Solar Two receiver proved the fabricability of this important system. However, successful operation of the system at Solar Two is needed to demonstrate the technical feasibility of the molten salt central receiver concept.« less
Zinc Bromide Flow Battery Installation for Islanding and Backup Power
2016-09-18
ability to control the generation has become more difficult with the increase of renewable energy systems such as solar photovoltaics ( PV ) and wind... PV and Inverter Room Building 6311 Rooftop Solar PV 30kW 232kW STC PV Array B5-PS2T33 Pad Switchboard ZnBr Energy Storage System (ESS) PowerBoxEnergy...Agreement • 1.5 MW of Photovoltaic • PV Parking lot lights • 24 Solar Thermal systems including the Combat Training Tank (Pool) Energy/Water Efficiency
1989-08-01
installation of amp-hour meters. 3. Evaluation of th6 low temperature performanceof Willard DH-5 pure lead batteries. b. Evaluation of the low...was abnormallyI low. This is seen in Table 7 which compares the solar radiation data received during this three year period with the 30 year averages...operational hour. This can be compared with a requirement for powering the microwave repeaters of about 2Ah/hour assuming a system voltage of 15V
NASA Astrophysics Data System (ADS)
Rahman, Yuli Asmi; Manjang, Salama; Yusran, Ilham, Amil Ahmad
2018-03-01
Power loss minimization have many advantagess to the distribution system radial among others reduction of power flow in feeder lines, freeing stress on feeder loading, deterrence of power procurement from the grid and also the cost of loss compensating instruments. This paper, presents capacitor and photovoltaic (PV) placement as alternative means to decrease power system losses. The paper aims to evaluate the best alternative for decreasing power system losses and improving voltage profile in the radial distribution system. To achieve the objectives of paper, they are used three cases tested by Electric Transient and Analysis Program (ETAP) simulation. Firstly, it performs simulation of placement capacitor. Secondly, simulated placement of PV. Lastly, it runs simulation of placement capacitor and PV simultaneously. The simulations were validated using the IEEE 34-bus test system. As a result, they proved that the installation of capacitor and PV integration simultaneously leading to voltage profile correction and power losses minimization significantly.
NASA Technical Reports Server (NTRS)
Colozza, Anthony J.; George, Pat; Gambrell, Ronnie; Chapman, Chris
2013-01-01
A habitat demonstration unit (HDU) was constructed at NASA Johnson Space Center (JSC) and designed by a multicenter NASA team led out of NASA Kennedy Space Center (KSC). The HDU was subsequently utilized at the 2010 Desert Research and Technology Studies (RATS) program held at the Black Point Lava Flow in Arizona. This report describes the power system design, installation and operation for the HDU. The requirements for the power system were to provide 120 VAC, 28 VDC, and 120 VDC power to the various loads within the HDU. It also needed to be capable of providing power control and real-time operational data on the load's power consumption. The power system had to be capable of operating off of a 3 phase 480 VAC generator as well as 2 solar photovoltaic (PV) power systems. The system operated well during the 2 week Desert RATS campaign and met all of the main goals of the system. The power system is being further developed to meet the future needs of the HDU and options for this further development are discussed.
24 CFR 3280.803 - Power supply.
Code of Federal Regulations, 2010 CFR
2010-04-01
...-Wiring Devices-Dimensional Specifications). (g) The overall length of a power-supply cord, measured from... supply shall be by means of: (1) One mast weatherhead installation installed in accordance with Article... underside of the manufactured home. The manufacturer shall provide in his written installation instructions...
Moyer, Rachael M; Song, Geoboo
2016-10-01
Recently, a controversial policy debate has arisen concerning the installation of high-voltage power lines in northwest Arkansas. While proponents argue that such an installation is inevitable to efficiently and reliably support the identified electric load in the region, opponents claim that the lines will degrade the natural environment and hamper the tourism-based local economy in affected regions, notably in Ozark Mountain areas. Of particular interest is to understand how local policy elites perceive the benefits and risks associated with such divisive proposals, which is critical for comprehending the formation and changes of related government policies. Based upon the dual process theory of judgment, this study systematically investigates the triadic relationships between (a) more profound personal value predispositions, (b) affects and feelings, and (c) perceived benefits and risks related to the proposed installation of high-voltage power lines among local policy elites in the state of Arkansas. In doing so, we analyze original data collected from a statewide Internet survey of 420 local leaders and key policymakers about their opinions on the related issues, while considering other factors claimed by previous literature to influence risk perceptions, including trust, knowledge level, and demographic characteristics. Analytical results suggest that grid-group cultural predispositions, as deeply held core values within local policy elites' individual belief systems, both directly and indirectly-through affective feelings-shape perceived utility associated with the installation of high-voltage power lines. We conclude this article by suggesting some practical considerations for better designing policy addressing controversial issues of this nature. © 2016 Society for Risk Analysis.
ERIC Educational Resources Information Center
D'Alessandro, Bill
1979-01-01
Describes the world's only solar electric village power system, a photovoltaic conversion installation in a remote Papago Indian Reservation village. Notes comparative costs, electric output, and potential applications of the system, a prototype for remote rural communities and developing nations. Notes outstanding questions and key issues in…
77 FR 3752 - Commission Information Collection Activities (FERC-725I); Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-25
... the Bulk-Power System to system disturbances, including scheduled and unscheduled outages; requires each reliability coordinator to establish requirements for its area's dynamic disturbance recording... Retention--10.... 10 acquisition and installation of dynamic disturbance recorders. GO, TO, and RC to...
Design and Implementation of an Innovative Residential PV System
NASA Astrophysics Data System (ADS)
Najm, Elie Michel
This work focuses on the design and implementation of an innovative residential PV system. In chapter one, after an introduction related to the rapid growth of solar systems' installations, the most commonly used state of the art solar power electronics' configurations are discussed, which leads to introducing the proposed DC/DC parallel configuration. The advantages and disadvantages of each of the power electronics' configurations are deliberated. The scope of work in the power electronics is defined in this chapter to be related to the panel side DC/DC converter. System integration and mechanical proposals are also within the scope of work and are discussed in later chapters. Operation principle of a novel low cost PV converter is proposed in chapter 2. The proposal is based on an innovative, simplified analog implementation of a master/slave methodology resulting in an efficient, soft-switched interleaved variable frequency flybacks, operating in the boundary conduction mode (BCM). The scheme concept and circuit configuration, operation principle and theoretical waveforms, design equations, and design considerations are presented. Furthermore, design examples are also given, illustrating the significance of the newly derived frequency equation for flybacks operating in BCM. In chapters 3, 4, and 5, the design implementation and optimization of the novel DC/DC converter illustrated in chapter 2 are discussed. In chapter 3, a detailed variable frequency BCM flyback design model leading to optimizing the component selections and transformer design, detailed in chapter 4, is presented. Furthermore, in chapter 4, the method enabling the use of lower voltage rating switching devices is also discussed. In chapter 5, circuitry related to Start-UP, drive for the main switching devices, zero-voltage-switching (ZVS) as well as turn OFF soft switching and interleaving control are fully detailed. The experimental results of the proposed DC/DC converter are presented in chapter 6. In chapter 7, a novel integration method is proposed for the residential PV solar system. The proposal presents solutions to challenges experimented in the implementation of today's approaches. Faster installation time, easier system grounding, and integration of the power electronics in order to reduce the number of connectors' and system cost are detailed. Installers with special skills as well as special tools are not required for implementing the proposed system integration. Photos of the experimental results related to the installation of a 3kW system, which was fully completed in less than an hour and a half, are also presented.
Development of a 66kV Class Rectifier Type Fault Current Limiter System
NASA Astrophysics Data System (ADS)
Ohkuma, Takeshi; Sato, Yoshibumi; Takahashi, Yoshihisa; Tokuda, Noriaki; Murai, Masaki; Nagasaki, Norihisa; Yuguchi, Kyousuke
A fault current limiter (FCL) is extensively expected to suppress fault current, particularly required for trunk power systems heavily connected high-voltage transmission lines, such as 500 kV class power system which constitutes the nucleus of the electric power system. By installing such FCL in the power system, the system interconnection is possible without the need to raise the capacity of the circuit breakers, and it is expected that FCLs may be used in more efficient power system design. For these reasons, FCLs based on various principles of operation have been developed in the world. In this paper, we have proposed a new type of FCL system, consisting of solid-state diodes, DC coil and bypass AC coil, and described the specification of distribution power system and 66 kV class FCL model. Also we have proposed a 66 kV class prototype single-phase model and the current limiting performance of this model was evaluated using a short circuit generator.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bergey, M.
1997-12-01
This paper discusses the concept of battery charging stations (BCSs), designed to service rural owners of battery power sources. Many such power sources now are transported to urban areas for recharging. A BCS provides the opportunity to locate these facilities closer to the user, is often powered by renewable sources, or hybrid systems, takes advantage of economies of scale, and has the potential to provide lower cost of service, better service, and better cost recovery than other rural electrification programs. Typical systems discussed can service 200 to 1200 people, and consist of stations powered by photovoltaics, wind/PV, wind/diesel, or dieselmore » only. Examples of installed systems are presented, followed by cost figures, economic analysis, and typical system design and performance numbers.« less
Solar-Diesel Hybrid Power System Optimization and Experimental Validation
NASA Astrophysics Data System (ADS)
Jacobus, Headley Stewart
As of 2008 1.46 billion people, or 22 percent of the World's population, were without electricity. Many of these people live in remote areas where decentralized generation is the only method of electrification. Most mini-grids are powered by diesel generators, but new hybrid power systems are becoming a reliable method to incorporate renewable energy while also reducing total system cost. This thesis quantifies the measurable Operational Costs for an experimental hybrid power system in Sierra Leone. Two software programs, Hybrid2 and HOMER, are used during the system design and subsequent analysis. Experimental data from the installed system is used to validate the two programs and to quantify the savings created by each component within the hybrid system. This thesis bridges the gap between design optimization studies that frequently lack subsequent validation and experimental hybrid system performance studies.
Latorre, Victor R.; Watwood, Donald B.
1994-01-01
A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard.
Aerodynamic and propeller performance characteristics of a propfan-powered, semispan model
NASA Technical Reports Server (NTRS)
Levin, Alan D.; Smith, Ronald C.; Wood, Richard D.
1985-01-01
A semispan wing/body model with a powered propeller was tested to provide data on a total powerplant installation drag penalty of advanced propfan-powered aircraft. The test objectives were to determine the total power plant installation drag penalty on a representative propfan aircraft; to study the effect of configuration modifications on the installed powerplant drag; and to determine performance characteristics of an advanced design propeller which was mounted on a representative nacelle in the presence of a wing.
47 CFR 73.875 - Modification of transmission systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... test operations at the full authorized ERP may commence immediately upon installation pursuant to § 73... the transmitter operating power (TPO) from the authorized value, but not the ERP, must be reported in...
46 CFR 197.332 - PVHO-Decompression chambers.
Code of Federal Regulations, 2011 CFR
2011-10-01
... pressure; (d) Have a means of operating all installed man-way locking devices, except disabled shipping... (m) Have a sound-powered headset or telephone as a backup to the communications system required by...
Hardwired Control Changes For NSTX DC Power Feeds
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramakrishnan, S.
The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physics Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. The original TFTR Hardwired Control System (HCS) with electromechanical relays was used for NSTX DC Power loop control and protection during NSTX operations. As part of the NSTX Upgrade, the HCS is being changed to a PLC-based system with the same control logic. This paper gives a description ofmore » the changeover to the new PLC-based system __________________________________________________« less
49 CFR Appendix A to Part 222 - Approved Supplementary Safety Measures
Code of Federal Regulations, 2010 CFR
2010-10-01
... crossings located within New Partial Quiet Zones shall be closed from 10 p.m. until 7 a.m. every day. Public... apply only to New Quiet Zones or New Partial Quiet Zones. Constant warning time devices and power-out...-Rule Partial Quiet Zones are renewed, or new automatic warning device systems are installed, power-out...
A Practical Study of the 66kV Fault Current Limiter (FCL) System with Rectifier
NASA Astrophysics Data System (ADS)
Tokuda, Noriaki; Matsubara, Yoshio; Yuguchi, Kyosuke; Ohkuma, Takeshi; Hobara, Natsuro; Takahashi, Yoshihisa
A fault current limiter (FCL) is extensively expected to suppress fault current, particularly required for trunk power systems heavily connected high-voltage transmission lines, such as 500kV class power system which constitutes the nucleus of the electric power system. By installing such FCL in the power system, the system interconnection is possible without the need to raise the capacity of the circuit breakers, and facilities can be configured for efficiency, among other benefits. For these reasons, fault current limiters based on various principles of operation have been developed both in Japan and abroad. In this paper, we have proposed a new type of FCL system, consisting of solid-state diodes, DC coil and bypass AC coil, and described the specification of distribution power system and 66kV model at the island power system and the superconducting cable power system. Also we have made a practical study of 66kV class, which is the testing items and the future subjects of the rectifier type FCL system.
Automatic Electronic Oxygen Supply
Ford, Patricia; Hoodless, D. J.
1971-01-01
An automatic electronic oxygen system has been devised to supply an intensive care unit with a “fail-safe” supply of continuous oxygen. All parts of the system are fitted with alarms, as the oxygen powers gas-driven ventilators. Since the system is cheap it can be installed in hospitals where finance is limited. PMID:5278618
Code of Federal Regulations, 2012 CFR
2012-07-01
... improvement. An improvement to an existing dwelling or farm residence through the installation of a solar heating system, a solar heating and cooling system, or a combined solar heating and cooling system or.... (Authority: 38 U.S.C. 3703(c)(1) and 3704(d)) Lien. Lien means any interest in, or power over, real or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... improvement. An improvement to an existing dwelling or farm residence through the installation of a solar heating system, a solar heating and cooling system, or a combined solar heating and cooling system or.... (Authority: 38 U.S.C. 3703(c)(1) and 3704(d)) Lien. Lien means any interest in, or power over, real or...
Code of Federal Regulations, 2013 CFR
2013-07-01
... improvement. An improvement to an existing dwelling or farm residence through the installation of a solar heating system, a solar heating and cooling system, or a combined solar heating and cooling system or.... (Authority: 38 U.S.C. 3703(c)(1) and 3704(d)) Lien. Lien means any interest in, or power over, real or...
Automatic Identification System (AIS) Collection and Reach-back System: System Description
2014-08-20
installation. 8.1.1 Power The HPS requires three NEMA 5 outlets, one each for the RPC, BPC, and KG-175D TACLANE-micro COMSEC device. The HPS draws less than...Military Sealift Command NEMA National Electrical Manufacturers Association NMEA National Marine Electronics Association NRL Naval Research Laboratory OTH-G
46 CFR 129.540 - Remote stopping-systems on OSVs of 100 or more gross tons.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Miscellaneous Electrical Systems § 129.540 Remote stopping... subpart 111.103 of this chapter: (1) For each propulsion unit, in the pilothouse. (2) For each discharge pump for bilge slop or dirty oil, at the deck discharge. (3) For each powered ventilation system...
Dynamic Modeling of Solar Dynamic Components and Systems
NASA Technical Reports Server (NTRS)
Hochstein, John I.; Korakianitis, T.
1992-01-01
The purpose of this grant was to support NASA in modeling efforts to predict the transient dynamic and thermodynamic response of the space station solar dynamic power generation system. In order to meet the initial schedule requirement of providing results in time to support installation of the system as part of the initial phase of space station, early efforts were executed with alacrity and often in parallel. Initially, methods to predict the transient response of a Rankine as well as a Brayton cycle were developed. Review of preliminary design concepts led NASA to select a regenerative gas-turbine cycle using a helium-xenon mixture as the working fluid and, from that point forward, the modeling effort focused exclusively on that system. Although initial project planning called for a three year period of performance, revised NASA schedules moved system installation to later and later phases of station deployment. Eventually, NASA selected to halt development of the solar dynamic power generation system for space station and to reduce support for this project to two-thirds of the original level.
2003-08-27
KENNEDY SPACE CENTER, FLA. - During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician (left) looks at the circuit breaker lights in the cabin. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”
NREL Helps Consumers Tap Into Solar Energy
photovoltaic system is sold back to the utility at the same rate as power is purchased from the utility. " who, what and why of financing, purchasing and installing photovoltaic (solar electric) systems in nationwide financing programs for photovoltaic systems and solar thermal systems, which heat indoor air and
Installation of a second superconducting wiggler at SAGA-LS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kaneyasu, T., E-mail: kaneyasu@saga-ls.jp; Takabayashi, Y.; Iwasaki, Y.
The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of themore » vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.« less
A computer assisted intelligent storm outage evaluator for power distribution systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Balakrishnan, R.; Pahwa, A.
1990-07-01
The lower voltage part of the power distribution system (primary and secondary sub-systems) does not have the provision for real-time status feedback, and as a result evaluation of outages is an extremely difficult task, especially during system emergencies caused by tornadoes and ice-storms. In this paper, a knowledge based approach is proposed for evaluation of storm related outages in the distribution systems. At the outset, binary voltage sensors capable of transmitting the real-time voltage on/off symptoms are recommended to be installed at strategic locations in the distribution system.
World Geothermal Congress WGC-2015
NASA Astrophysics Data System (ADS)
Tomarov, G. V.; Shipkov, A. A.
2016-08-01
This article discusses materials and results of the World Geothermal Congress that was held in Melbourne (Australia) from April 19 to April 25, 2015. Information on the extent and technological features of utilization of geothermal resources for heat supply and power production, as well as in other economic areas, is given. A stable growth in the capacity and number of geothermal power systems that is determined by ecological cleanliness, economic efficiency, and the highest (among renewable energy sources) indicators of installed capacity utilization is shown. It was noted that combined schemes of geothermal power plants (GPPs), such as turbine units of different type (binary units, units with one or two separation pressures, etc.), have become more frequently used to increase the efficiency of utilization of geothermal heat carrier. Actual data determining room heating systems with the total worldwide capacity of nearly 50000 MW thermal (MWt) as the most currently significant segment of consumption of geothermal waters are given. In addition, geothermal resources are also utilized in soil pumps, balneological and sports basins, greenhouse complexes, and other manufactures. It was noted that geological studies were carried out in more than 40 countries, with the development of methods of simulation of tanks for the existing and new geothermal fields. Trends of development and the role of geothermal power engineering in the energy supply of many countries are shown. It was shown that prospects for the development of geothermal power generation are significantly associated with utilization of low-temperature geothermal sources in binary power generating units, as well as with the increase in installed capacity of operating geothermal power plants (GPPs) without drilling additional wells, i.e., by using waste geothermal heat carrier in binary-cycle or combined-cycle power plants. The article provides data on a pilot binary power unit at Pauzhetka GPP and on a promising Russian geothermal project to increase the installed capacity of Mutnovsk GPP (whose current capacity is 50.0 (2 × 25.0) MW of electric power) by 25% by constructing a combined binary-cycle power generating unit on the basis of waste separate utilization.
NATIONAL ASSESSMENT OF EMISSIONS REDUCTION IMPACT FROM ROOFTOP PV
This effort will determine the emissions impacts to the U.S. PV generated electricity when PV systems are installed on building rooftops and employed as demand-side power supplies. The national assessment will be based on data provided by existing rooftop PV systems that have be...
46 CFR 119.715 - Piping subject to more than 1,034 kPa (150 psig) in non-vital systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 PASSENGERS MACHINERY INSTALLATION Piping Systems § 119.715 Piping subject to more than 1,034 kPa... Standards Institute (ANSI) B 31.1 “American National Standard Code for Pressure Piping, Power Piping,” or...
46 CFR 119.715 - Piping subject to more than 1,034 kPa (150 psig) in non-vital systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 PASSENGERS MACHINERY INSTALLATION Piping Systems § 119.715 Piping subject to more than 1,034 kPa... Standards Institute (ANSI) B 31.1 “American National Standard Code for Pressure Piping, Power Piping,” or...
Hand tremor and activity sensor
NASA Technical Reports Server (NTRS)
Konigsberg, E.
1975-01-01
System detects hand tremor and activity and transmitting signals over distance of at least 3 meters to receiver system. Designed for use in studies of effect of fatigue on individual's judgement or reaction time, sensor is installed within mounting of finger-ring; no external wiring or power source is needed.
NASA Technical Reports Server (NTRS)
Dupree, David T.; Hawkins, W. Kent
1947-01-01
A study has been made of the performance of the induction and the exhaust systems on the XR60 power-plant installation as part of an investigation conducted in the Cleveland altitude wind tunnel. Altitude flight conditions from 5000 to 30,000 feet were simulated for a range of engine powers from 750 to 3000 brake horsepower. Slipstream rotation prevented normal pressure recoveries in the right side of the main duct in the region of the right intercooler cooling-air duct inlet. Total-pressure losses in the charge-air flow between the turbosupercharger and the intercoolers were as high as 2.1 inches of mercury. The total-pressure distribution of the charge air at the intercooler inlets was irregular and varied as much as 1.0 inch of mercury from the average value at extreme conditions, Total-pressure surveys at the carburetor top deck showed a variation from the average value of 0.3 inch of mercury at take-off power and 0.05 inch of mercury at maximum cruising power, The carburetor preheater system increased the temperature of the engine charge air a maximum of about 82 F at an average cowl-inlet air temperature of 9 F, a pressure altitude of 5000 feet, and a brake horsepower of 1240.
NASA Astrophysics Data System (ADS)
Mitrofanova, O. V.; Ivlev, O. A.; Urtenov, D. S.
2018-03-01
Hydrodynamics and heat exchange in the elements of thermal hydraulic tracts of ship nuclear reactors of the new generation were numerically simulated in this work. Parts of the coolant circuit in the collector and piping systems with geometries that may lead to generation of stable large-scale vortexes, causing a wide range of acoustic oscillations of the coolant, were selected as modeling objects. The purpose of the research is to develop principles of physical and mathematical modeling for scientific substantiation of optimal layout solutions that ensure enhanced operational life of icebreaker’s nuclear power installations of new generation with reactors of integral type.
Voltage regulation and power losses reduction in a wind farm integrated MV distribution network
NASA Astrophysics Data System (ADS)
Fandi, Ghaeth; Igbinovia, Famous Omar; Tlusty, Josef; Mahmoud, Rateb
2018-01-01
A medium-voltage (MV) wind production system is proposed in this paper. The system applies a medium-voltage permanent magnet synchronous generator (PMSG) as well as MV interconnection and distribution networks. The simulation scheme of an existing commercial electric-power system (Case A) and a proposed wind farm with a gearless PMSG insulated gate bipolar transistor (IGBT) power electronics converter scheme (Case B) is compared. The analyses carried out in MATLAB/Simulink environment shows an enhanced voltage profile and reduced power losses, thus, efficiency in installed IGBT power electronics devices in the wind farm. The resulting wind energy transformation scheme is a simple and controllable medium voltage application since it is not restrained by the IGBT power electronics voltage source converter (VSC) arrangement. Active and reactive power control is made possible with the aid of the gearless PMSG IGBT power converters.
NASA Astrophysics Data System (ADS)
Siswanto, Agus; Gunadin, Indar Chaerah; Said, Sri Mawar; Suyuti, Ansar
2018-03-01
The purpose of this research is to improve the stability of interconnection of South Sulawesi system caused by penetration new wind turbine in Sidrap area on bus 2 and in Jeniponto area on bus 34. The method used in this research was via software Power System analysis Toolbox (PSAT) under MATLAB. In this research, there are two problems that are evaluated, the stability of the system before and after penetration wind turbine into the system South Sulawesi system. From the simulation result shows that penetration of wind turbine on bus 2 Sidrap, bus 37 Jeniponto give effect oscillation on the system. The oscillation was damped by installation of Power System Stabilizer (PSS) on bus 29 area Sungguminasa, that South Sulawesi system stable according to normal condition.
1964-06-19
XV-5A airplane installed in 40x80ft Subsonic Wind Tunnel at NASA Ames Research Center with Tom Mills. The propulsive lift system was tested to determine power-on performance characteristics in preparation for flight tests.
1964-06-19
XV-5A airplane installed in 40x80ft Subsonic Wind Tunnel at NASA Ames Research Center with Tom Mills. The propulsive lift system was tested to determine power-on performance characteristics in preparation for flight tests.