Sample records for preparation program approval

  1. A Directory of Approved Programs in Colorado for the Preparation of Professional Educational Personnel.

    ERIC Educational Resources Information Center

    Colorado State Dept. of Education, Denver.

    This directory provides a listing of programs for the preparation of professional educational personnel currently approved by the Colorado State Board of Education. The publication is designed to be a source of information regarding available educator preparation programs in Colorado institutions of higher learning as well as an aid to…

  2. 10 CFR 851.11 - Development and approval of worker safety and health program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Development and approval of worker safety and health program. 851.11 Section 851.11 Energy DEPARTMENT OF ENERGY WORKER SAFETY AND HEALTH PROGRAM Program Requirements § 851.11 Development and approval of worker safety and health program. (a) Preparation and...

  3. School Administration Handbook for Approved Schools for Medical Record Technicians. Revised April 66.

    ERIC Educational Resources Information Center

    American Association of Medical Record Librarians, Chicago, IL.

    These guidelines are for the development and operation of approved programs to prepare medical record technicians. "School Approval" discusses the cooperative roles of the American Medical Association (AMA) Council on Medical Education and the American Association of Medical Record Librarians (AAMRL) in connection with program approval,…

  4. Program and Course Approval Handbook. Fifth Edition

    ERIC Educational Resources Information Center

    California Community Colleges, Chancellor's Office, 2013

    2013-01-01

    This "Program and Course Approval Handbook" assists California Community College (CCC) administrators, faculty, and staff in the development of programs and courses and the submission of these proposals for review by the Chancellor's Office. By law, the Chancellor is required to prepare and distribute a handbook for program and course…

  5. 10 CFR 850.10 - Development and approval of the CBDPP.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Development and approval of the CBDPP. 850.10 Section 850.10 Energy DEPARTMENT OF ENERGY CHRONIC BERYLLIUM DISEASE PREVENTION PROGRAM Administrative Requirements § 850.10 Development and approval of the CBDPP. (a) Preparation and submission of initial CBDPP to...

  6. 10 CFR 850.10 - Development and approval of the CBDPP.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Development and approval of the CBDPP. 850.10 Section 850.10 Energy DEPARTMENT OF ENERGY CHRONIC BERYLLIUM DISEASE PREVENTION PROGRAM Administrative Requirements § 850.10 Development and approval of the CBDPP. (a) Preparation and submission of initial CBDPP to...

  7. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  8. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  9. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  10. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  11. Toward a unified system of accreditation for professional preparation in health education: final report of the National Task Force on Accreditation in Health Education.

    PubMed

    Allegrante, John P; Airhihenbuwa, Collins O; Auld, M Elaine; Birch, David A; Roe, Kathleen M; Smith, Becky J

    2004-12-01

    During the past 40 years, health education has taken significant steps toward improving quality assurance in professional preparation through individual certification and program approval and accreditation. Although the profession has begun to embrace individual certification, program accreditation in health education has been neither uniformly available nor universally accepted by institutions of higher education. To further strengthen professional preparation in health education, the Society for Public Health Education (SOPHE) and the American Association for Health Education (AAHE) established the National Task Force on Accreditation in Health Education in 2001. The 3-year Task Force was charged with developing a detailed plan for a coordinated accreditation system for undergraduate and graduate programs in health education. This article summarizes the Task Force's findings and recommendations, which have been approved by the SOPHE and AAHE boards, and, if implemented, promise to lay the foundation for the highest quality professional preparation and practice in health education.

  12. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance with... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  13. A Comparison of Internships among Louisiana University Principal Preparation Programs

    ERIC Educational Resources Information Center

    Campbell, Kathleen Taylor; Parker, Randy

    2016-01-01

    After widespread accusations that universities were not adequately preparing school leadership candidates with real world experiences, the movement to reform U.S. university principal preparation began. The National Policy Board for Educational Administration approved the Educational Leadership Constituent Council (ELCC) standards as guidelines…

  14. 75 FR 72858 - Agency Information Collection Activities; Revision of a Currently-Approved Information Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... Safety Assistance Programs (MCSAP).'' The information required consists of grant application preparation, quarterly reports and electronic data documenting the results of driver/vehicle inspections performed by the... Time per Response: Grant application preparation: 79.5 hours each; quarterly report preparation: 8...

  15. 15 CFR 923.60 - Review/approval procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE... management program are not required, OCRM will prepare draft and final environmental impact statements, in... preparation and dissemination of draft and final environmental impact statements and lengthy Federal agency...

  16. Experimental Evaluation of Prepared Lesson Plans on Instruction in Vocational Agriculture.

    ERIC Educational Resources Information Center

    Ahrens, Donald Louis

    To determine the value of prepared lesson plans on instruction in vocational agriculture, 12 randomly selected Iowa high schools with approved vocational agriculture programs were randomly divided into two groups of six including a control group and a treatment group. Prepared lesson plans provided the only variance in instruction. Two meetings…

  17. 7 CFR 1416.704 - Payment calculation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PROGRAMS 2005 Hurricane Tree Assistance Program § 1416.704 Payment calculation. (a) An approved eligible... for: (1) Seedlings or cuttings, for trees, bushes or vine replanting; (2) Site preparation and debris... through natural regeneration into a productive tree stand. (b) Costs for fencing, irrigation, irrigation...

  18. Guidelines for Fitness for Health Programs in Texas.

    ERIC Educational Resources Information Center

    Texas Higher Education Coordinating Board, Austin.

    This publication presents approved guidelines for Texas institutions of higher and postsecondary education in the academic preparation of practitioners in the field of fitness for health. Developed in response to the rapid growth of this field, the guidelines identify and recommend the knowledge and expertise required in career preparation, and…

  19. Educator Preparation in Colorado, 1995-96.

    ERIC Educational Resources Information Center

    Colorado State Dept. of Education, Denver.

    This report provides data on teacher education and certification in Colorado in the following formats: (1) the number of students in each of the 16 Colorado institutions of higher education approved for educator preparation programs who were recommended for licensure and endorsements during 1995-1996 (total 2517); (2) the numbers of students…

  20. Home Economics Cooperative Education.

    ERIC Educational Resources Information Center

    Texas Tech. Univ., Lubbock. School of Home Economics.

    Prepared by home economics instructional materials center staff, this handbook is for use by home economics cooperative education teacher-coordinators in planning vocational home economics gainful employment programs and courses on the high school level. Contents include: (1) general information on the program, (2) approved occupations for the…

  1. Institutional review board-based recommendations for medical institutions pursuing protocol approval for facial transplantation.

    PubMed

    Siemionow, Maria Z; Gordon, Chad R

    2010-10-01

    Preliminary outcomes from the previous nine face transplants performed since 2005 have been encouraging and have therefore led to a rise in the number of medical centers interested in establishing face transplant programs worldwide. However, until now, very little literature has been published providing surgeons the necessary insight on how to (1) prepare a protocol for institutional review board approval and (2) establish a face transplant program. The authors' face transplant team's experience with the institutional review board at the Cleveland Clinic, beginning in 2002, was critically reviewed in a detailed, retrospective manner. The purpose was to identify and define certain criteria necessary for both the institutional review board approval process and face transplant program establishment. In 2002, unprecedented efforts from within the authors' plastic surgery department led to the world's first institutional review board approval for face transplantation, in 2004. As a result, 4 years later, the authors' face transplant team performed the nation's first successful near-total face and maxilla transplant. Every surgical department hoping to establish a face transplant program must realize that this endeavor requires both tremendous financial and long-term commitments by its medical institution. These transplants should be performed only within university-based medical centers capable of orchestrating a specialized, talented, multidisciplinary team. More importantly, facial composite tissue allotransplantation possesses an unmatched level of complexity and therefore requires most centers to prepare a carefully detailed protocol using these institutional review board-based guidelines.

  2. 30 CFR 795.10 - Qualified laboratories.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the work to be performed; (2) Has adequate space for material preparation and cleaning and sterilizing... or guidelines for data acquisition may be approved by the program administrator. (6) Has the...

  3. The State of State Policies for Principal Preparation Program Approval and Candidate Licensure

    ERIC Educational Resources Information Center

    Anderson, Erin; Reynolds, Amy

    2015-01-01

    Policies for principal preparation and licensure are important levers for improving school leadership. By developing a rubric of research-based practices, this University Council of Educational Administration study aims to provide a formative tool for policy makers. Using a policy analysis frame by Roach et al., this study explores the state code,…

  4. Colorado Commission on Higher Education Report to the General Assembly Educator Preparation, Fiscal Year 2009-2010

    ERIC Educational Resources Information Center

    Colorado Commission on Higher Education, 2011

    2011-01-01

    Pursuant to Section 23-1-121(6) Colorado Revised Statutes (CRS), the Colorado Commission on Higher Education (CCHE) reports annually to the Education Committees of the General Assembly on the effectiveness of the review of educator preparation programs. This report also includes: (1) An overview of enrollments in approved educator preparation…

  5. The Development of the George B. Pegram Award

    NASA Astrophysics Data System (ADS)

    McCay, Myron S.

    1997-11-01

    The George B. Pegram Award for Excellence in the Teaching of Physics was developed by a representative group of SESAPS members over a period of eight years with outstanding contributions as follows: Jesse Beams, APS President, with the advice of Mark Zemansky, AAPT, chose George B. Pegram as the honoree, in view of his excellent teaching career at Columbia University, his graduation from Trinity College--now Duke University, his long period of service as Treasurer of APS, and his active support of the special training program at ORAU; Earle Plyler with the assistance of Edward Burke, Jr., prepared the selection criteria for the recipients of the award; Walter Gordy coordinated the APS approval and initiated the financing of the program; Howard Carr raised the first funds and prepared the initial certificates; William G. Pollard joined the committee and completed the early funding, while preparing the formal certificate and medal; Dr. Vernet Eaton, AAPT President, stimulated the program when he urged the nomination of SESAPS members for the Oersted Award. After his lectures at the 1955 Gainesville meeting, Wendell Holladay instructed the committee to report its recommendations at the next SESAPS meeting. In 1969 SESAPS approved the George B. Pegram Award.

  6. A New Approach to Teacher Education and Teacher Certification.

    ERIC Educational Resources Information Center

    Washington Office of the State Superintendent of Public Instruction, Olympia. Div. of Teacher Education and Certification.

    New certification standards adopted by the Washington State Board of Education in 1971 were designed to develop teacher education programs that ensure the highest quality of professional performance by teachers prepared within them. Teacher education programs under the new standards are approved by the State Board of Education only when three…

  7. 33 CFR 385.13 - Projects implemented under additional program authority.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Report is prepared and approved in accordance with § 385.26; and (3) Not exceed a total cost of... RESTORATION PLAN CERP Implementation Processes § 385.13 Projects implemented under additional program authority. (a) To expedite implementation of the Plan, the Corps of Engineers and non-Federal sponsors may...

  8. Army Medical Research and Materiel Command Resident Research Associateship Program

    DTIC Science & Technology

    2017-05-01

    Award Number: W81XWH-12-2-0033 TITLE: Army Medical Research & Materiel Command Resident Research Associateship Program PRINCIPAL INVESTIGATOR...PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public...SUBTITLE NRC/AMRMC Resident Research Associateship Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER W81XWH-12-2-0033 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S

  9. 77 FR 75648 - Notice of Intent To Prepare an Environmental Impact Statement To Evaluate the Use of Three New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Prepare an Environmental Impact Statement To Evaluate the Use of Three New Herbicides on Public Lands in..., and rimsulfuron herbicides as part of the its vegetation treatment programs on public lands in 17... rimsulfuron to the BLM's approved list of herbicides for (1) Controlling noxious weeds and other invasive...

  10. 30 CFR 950.12 - State program provisions and amendments not approved.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... coal from its impurities” within the definition of “coal preparation plant” at Chapter I, section 2(m... baseline surface water data on acidity; (4) Deletion of the locational data requirements for monitoring...

  11. Planning, Preparation, and Transport of the High-Enriched Uranium Spent Nuclear Fuel from the Czech Republic to the Russian Federation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    M. J. Tyacke; I. Bolshinsky; Frantisek Svitak

    The United States, Russian Federation, and the International Atomic Energy Agency have been working together on a program called the Russian Research Reactor Fuel Return (RRRFR) Program, which is part of the Global Threat Reduction Initiative. The purpose of this program is to return Soviet or Russian-supplied high-enriched uranium (HEU) fuel, currently stored at Russian-designed research reactors throughout the world, to Russia. In February 2003, the RRRFR Program began discussions with the Nuclear Research Institute (NRI) in Rež, Czech Republic, about returning their HEU spent nuclear fuel to the Russian Federation for reprocessing. In March 2005, the U.S. Department ofmore » Energy signed a contract with NRI to perform all activities needed for transporting their HEU spent nuclear fuel to Russia. After 2 years of intense planning, preparations, and coordination at NRI and with three other countries, numerous organizations and agencies, and a Russian facility, this shipment is scheduled for completion before the end of 2007. This paper will provide a summary of activities completed for making this international shipment. This paper contains an introduction and background of the RRRFR Program and the NRI shipment project. It summarizes activities completed in preparation for the shipment, including facility preparations at NRI in Rež and FSUE “Mayak” in Ozyorsk, Russia; a new transportation cask system; regulatory approvals; transportation planning and preparation in the Czech Republic, Slovakia, Ukraine, and the Russian Federation though completion of the Unified Project and Special Ecological Programs. The paper also describes fuel loading and cask preparations at NRI and final preparations/approvals for transporting the shipment across the Czech Republic, Slovakia, Ukraine, and the Russian Federation to FSUE Mayak where the HEU spent nuclear fuel will be processed, the uranium will be downblended and made into low-enriched uranium fuel for commercial reactor use, and the high-level waste from the processing will be stabilized and stored for less than 20 years before being sent back to the Czech Republic for final disposition. Finally, the paper contains a section for the summary and conclusions.« less

  12. 32 CFR 56.9 - Ensuring compliance with this part in Federal financial assistance programs and activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... approval of these supplementary guidelines from the ASD(MRA&L), or designee, before issuing them. Prior to their issuance, the ASD(MRA&L), or designee, shall submit supplementary guidelines prepared pursuant to... Components deal with the employment of civilians in programs and activities subject to this part the ASD(MRA...

  13. 32 CFR 56.9 - Ensuring compliance with this part in Federal financial assistance programs and activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... approval of these supplementary guidelines from the ASD(MRA&L), or designee, before issuing them. Prior to their issuance, the ASD(MRA&L), or designee, shall submit supplementary guidelines prepared pursuant to... Components deal with the employment of civilians in programs and activities subject to this part the ASD(MRA...

  14. 32 CFR 56.9 - Ensuring compliance with this part in Federal financial assistance programs and activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... approval of these supplementary guidelines from the ASD(MRA&L), or designee, before issuing them. Prior to their issuance, the ASD(MRA&L), or designee, shall submit supplementary guidelines prepared pursuant to... Components deal with the employment of civilians in programs and activities subject to this part the ASD(MRA...

  15. The Teaching of the Code of Ethics and Standard Practices for Texas Educator Preparation Programs

    ERIC Educational Resources Information Center

    Davenport, Marvin; Thompson, J. Ray; Templeton, Nathan R.

    2015-01-01

    The purpose of this descriptive quantitative research study was to answer three basic informational questions: (1) To what extent ethics training, as stipulated in Texas Administrative Code Chapter 247, was included in the EPP curriculum; (2) To what extent Texas public universities with approved EPP programs provided faculty opportunities for…

  16. Mississippi CaP HBCU Undergraduate Research Training Program

    DTIC Science & Technology

    2017-11-01

    AWARD NUMBER: W81XWH-14-1-0151 TITLE: Mississippi CaP HBCU Undergraduate Research Training Program PRINCIPAL INVESTIGATOR: Christian Gomez...Final PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for...2017 4. TITLE AND SUBTITLE Mississippi CaP HBCU Undergraduate Research Training Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER W81XWH-14-1-0151 5c

  17. 30 CFR 876.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ACID MINE DRAINAGE TREATMENT AND ABATEMENT PROGRAM § 876.1 Scope. This part establishes the requirements and procedures for the preparation, submission and approval of State or Indian tribe Acid Mine...

  18. 30 CFR 876.1 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ACID MINE DRAINAGE TREATMENT AND ABATEMENT PROGRAM § 876.1 Scope. This part establishes the requirements and procedures for the preparation, submission and approval of State or Indian tribe Acid Mine...

  19. 30 CFR 876.1 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ACID MINE DRAINAGE TREATMENT AND ABATEMENT PROGRAM § 876.1 Scope. This part establishes the requirements and procedures for the preparation, submission and approval of State or Indian tribe Acid Mine...

  20. 30 CFR 876.1 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ACID MINE DRAINAGE TREATMENT AND ABATEMENT PROGRAM § 876.1 Scope. This part establishes the requirements and procedures for the preparation, submission and approval of State or Indian tribe Acid Mine...

  1. 30 CFR 876.1 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ACID MINE DRAINAGE TREATMENT AND ABATEMENT PROGRAM § 876.1 Scope. This part establishes the requirements and procedures for the preparation, submission and approval of State or Indian tribe Acid Mine...

  2. Personnel and Cargo Transport in Antarctica: Analysis of Current U.S. Transport System

    DTIC Science & Technology

    1991-03-01

    George L. Blaisdell March 1991 ,i . . 1 U - I I Prepared for DIVISION OF DOLAR PROGRAMS NATIONAL SCIENCE FOUNDATION Approved for public release...Engineering Division, U.S. Army Cold Regions Research and Engineering Laboratory. Funding was provided by the Division of Polar Programs, National Science Foundation . A...Current U.S. Transport System GEORGE L. BLAISDELL INTRODUCTION The National Science Foundation (NSF), operator of the U.S. Antarctic program, has

  3. 24 CFR 8.21 - Non-housing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... action that it can demonstrate would result in a fundamental alteration in the nature of its program or... furnishings) changes in management policies or procedures, acquisition or construction of additional... with whose assistance the plan was prepared. (Approved by the Office of Management and Budget under...

  4. 30 CFR 582.23 - Testing Plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...

  5. 30 CFR 582.23 - Testing Plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...

  6. 30 CFR 582.23 - Testing Plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...

  7. Lease-Purchase Program Applicant Handbook.

    ERIC Educational Resources Information Center

    California State Dept. of General Services, Sacramento. Office of Public School Construction.

    This manual guides applicants through the process of acquiring and managing California state funds for public school facility construction projects. Section 1 focuses on determining eligibility and on preparing application packages for Phase P approval and/or apportionment. Section 2 examines regulations and required forms for selecting school…

  8. National Apprenticeship and Training Standards for Bricklaying. Revised.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC. Bureau of Apprenticeship and Training.

    Developed as a guide for local joint apprenticeship and training committees in establishing local bricklaying apprenticeship programs, this booklet represents the sixth revision of the national apprenticeship and training standards for bricklaying apprenticeship. (The standards were prepared and approved by the National Joint Bricklaying…

  9. 46 CFR 161.002-18 - Method of application for type approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the system's instruction manual, including information concerning installation, programming, operation... section. (4) Three copies of a list prepared by the manufacturer that contains the name, model number, and... cabinet, detector, zone card, isolator, central processing unit, zener barrier, special purpose module, or...

  10. Managing the Service Supply Chain in Department of Defense: Implications for the Program Management Infrastructure

    DTIC Science & Technology

    2007-04-30

    School 4th Annual Acquisition Research Symposium of the Naval Postgraduate School: Approved for public release, distribution unlimited. Prepared ...where he teaches graduate acquisition and contract management courses . Prior to his appointment at the Naval Postgraduate School, he served for ... for the Program Management Infrastructure Published: 30 April 2007 by Rene G. Rendon, Lecturer, and Uday Apte, Professor, Naval Postgraduate

  11. WFC3 Cycle 19 Calibration Program

    NASA Astrophysics Data System (ADS)

    Sabbi, E.; WFC3 Team

    2012-03-01

    The Cycle 19 WFC3 Calibration Program runs from October 2011 through September 2012 and is designed to measure and monitor the behavior of both the UVIS and IR channels. The program was prepared with the actual usage of WFC3 in mind, to provide the best calibration data and reference les for the approved scientic programs. During Cycle 19 the WFC3 team is using 125 external and 1587 internal orbits of HST time divided in 29 di erent programs, grouped in six categories: Monitor, Photometry, Spectroscopy, Detectors, Flat-elds, and Image Quality

  12. 48 CFR 1352.209-71 - Limitation of future contracting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... feasibility, proof of design and test, or engineering of programs not yet approved for acquisition or... computer software; and may appear in cost and pricing data or involve classified information. (iv) “System...'s development, production, or support. (vi) “Systems Engineering” means preparing specifications...

  13. 48 CFR 1352.209-71 - Limitation of future contracting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... feasibility, proof of design and test, or engineering of programs not yet approved for acquisition or... computer software; and may appear in cost and pricing data or involve classified information. (iv) “System...'s development, production, or support. (vi) “Systems Engineering” means preparing specifications...

  14. 48 CFR 1352.209-71 - Limitation of future contracting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... feasibility, proof of design and test, or engineering of programs not yet approved for acquisition or... computer software; and may appear in cost and pricing data or involve classified information. (iv) “System...'s development, production, or support. (vi) “Systems Engineering” means preparing specifications...

  15. Guidelines for Certification of Media Specialists.

    ERIC Educational Resources Information Center

    Galey, Minaruth; Grady, William F.

    This certification model, which is a refined version of the 1974 AECT Certification Model, is directed to the needs of educational media specialists, their employers and educators, and to certifying and accrediting agencies that approve programs preparing educational media specialists. Included in the document are reports on accreditation and…

  16. An undergraduate program for astronomy in México

    NASA Astrophysics Data System (ADS)

    Bravo-Alfaro, Hector; Migenes, Victor

    Astronomy in Mexico has an ancient tradition, reinforced during the XXth century by groups working in theoretical and observational astronomy. During the 90s, the Great Millimeter Telescope (a single 50-m antenna) has been approved, and a 6-m infrared telescope is under study. Graduate and undergraduate programs must be improved to prepare future Mexican and Latin American astronomers to take advantage of these facilities. To meet the challenge, two traditional Mexican programs (Instituto de Astronomia-UNAM and Instituto Nacional de Astrofisica, Optica y Electronica-INAOE) are updating their graduate programs for. Similarly, the Departamento de Astronomia de la Universidad de Guanajuato is joining physicists in the first undergraduate program in Mexico in Physics and Engineering with an option in Astrophysics. This will prepare students so that they can choose between industry, academia or national laboratories, either in Physics or Astronomy. Jobs in academia have been scarce; many students had to give up their goals after one or two postdoctoral positions. Graduate and undergraduate programs must adjust, by broadening the scope of present programs so that students are better prepared for other job opportunities. We present a BSc program designed by astronomers and physicists to try to address some of these concerns and prepare the students for either continuing with graduate studies or finding employment in an ever-changing job market.

  17. Risk evaluation and mitigation strategies: a focus on the mycophenolic acid preparations.

    PubMed

    Rostas, Sara; Kim, Miae; Gabardi, Steven

    2014-03-01

    To review risks associated with mycophenolic acid (MPA) preparations and evaluate their required risk evaluation and mitigation strategies (REMS) elements. Articles were identified through a non-date-limited MEDLINE and EMBASE search using the terms fetal toxicity, teratogenicity, risk evaluation and mitigation strategies, REMS, MPA, mycophenolate mofetil, entericcoated MPA, and organ transplant. Information from the Food and Drug Administration (FDA) and the manufacturers of the MPA preparations was also evaluated. The MPA preparations are associated with several potential risks, including gastrointestinal disturbances and myelosuppression; however, their impact on the fetus in pregnant patients taking 1 of these agents poses the greatest risk. The FDA approved REMS programs for all MPA products, both innovator and generic preparations, in September 2012. With evidence of increased risk of miscarriage and birth defects associated with MPA use, the FDA instituted a REMS program that contains both a medication guide and elements to assure safe use (ETASU). The medication guides for the MPA products, which were previously FDA approved, should continue to be distributed to patients who get either an initial prescription filled or a refill. The ETASU requires prescribers to complete training and obtain patient signatures on the Patient-Prescriber Acknowledgment Form. A single, national, voluntary pregnancy registry specific to this medication has been established, and pregnant patients should be encouraged to participate. Although the impact of the MPA REMS on clinical practice is not clear, it is a step toward increasing the understanding of fetal risks with MPA.

  18. 75 FR 17155 - Preparation of an Environmental Assessment (EA) for Proposed Outer Continental Shelf (OCS) Oil...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-05

    ... all requirements of NEPA, the Coastal Zone Management Act, Outer Continental Shelf Lands Act, and... consistent with each affected state's federally approved Coastal Zone Management program. Finally, the MMS...-circulation modeling, ecological effects of oil and gas activities, and hurricane impacts on coastal...

  19. Child Nutrition Labeling for Meat and Poultry Products.

    ERIC Educational Resources Information Center

    Wade, Cheryl; And Others

    Prepared for food manufacturers, this publication contains instructions for calculating the contribution that a meat or poultry product makes toward the meal pattern requirements of child nutrition programs. It also contains instructions on how to apply for and obtain the approval for a label containing a child nutrition statement. These…

  20. Rescue Skills and Techniques.

    ERIC Educational Resources Information Center

    Defense Civil Preparedness Agency (DOD), Washington, DC.

    The guide has been prepared for use as a textbook in rescue training courses at DCPA (Defense Civil Preparedness Agency) approved training schools and is to be used in rescue training programs of State and local governments. The document explains the various types of rescue missions, command structure, the personnel of the operating unit,…

  1. 76 FR 23196 - Approval and Promulgation of Air Quality Implementation Plans; IL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... Promulgation of Air Quality Implementation Plans; IL AGENCY: Environmental Protection Agency (EPA). ACTION... VOC for purposes of preparing SIPs to attain the national ambient air quality standard for ozone under... Section, Air Programs Branch (AR-18J), U.S. Environmental Protection Agency, 77 West Jackson Boulevard...

  2. The Portfolio Creation Model Developed for the Capital Investment Program Plan Review (CIPPR)

    DTIC Science & Technology

    2014-11-12

    Basinger, Director, DCI, CFD Scientific Letter The PORTFOLIO CREATION MODEL developed for the Capital Investment Program Plan Review (CIPPR) To inform...senior management about CIPPR decision support, this scientific letter has been prepared upon request [1] to clarify some of the key concepts about...delivery process as laid out in the Defence Project Approval Directive (PAD). 1 With respect to the list above, the subject of this scientific letter is

  3. The Benefits and Limitations of Hydraulic Modeling for Ordinary High Water Mark Delineation

    DTIC Science & Technology

    2016-02-01

    ER D C/ CR RE L TR -1 6- 1 Wetland Regulatory Assistance Program (WRAP) The Benefits and Limitations of Hydraulic Modeling for Ordinary...client/default. Wetland Regulatory Assistance Program (WRAP) ERDC/CRREL TR-16-1 February 2016 The Benefits and Limitations of Hydraulic Modeling...Approved for public release; distribution is unlimited. Prepared for Headquarters, U.S. Army Corps of Engineers Washington, DC 20314-1000 Under Wetlands

  4. MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints

    DTIC Science & Technology

    2001-08-01

    progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New

  5. Preparing Preservice Teachers for Inclusive Classrooms: A State-Wide Survey of Teacher Education Faculty

    ERIC Educational Resources Information Center

    Lang, Lucinda Anne; Bell, Sherry Mee

    2017-01-01

    Faculty (N = 154) from approved Tennessee teacher education programs across the range of disciplines responded to an online survey designed to assess the extent to which they practice, teach, and express confidence in co-teaching, collaboration and implementation of universal design for learning (UDL). Faculty strongly endorsed items indicating…

  6. 7 CFR 1710.209 - Approval requirements for load forecast work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... cooperate in the preparation of and submittal of the load forecast work plan of their power supply borrower. (b) An approved load forecast work plan establishes the process for the preparation and maintenance... approved load forecast work plan must outline the coordination and preparation requirements for both the...

  7. CERCA LEU fuel assemblies testing in Maria Reactor - safety analysis summary and testing program scope.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pytel, K.; Mieleszczenko, W.; Lechniak, J.

    2010-03-01

    The presented paper contains neutronic and thermal-hydraulic (for steady and unsteady states) calculation results prepared to support annex to Safety Analysis Report for MARIA reactor in order to obtain approval for program of testing low-enriched uranium (LEU) lead test fuel assemblies (LTFA) manufactured by CERCA. This includes presentation of the limits and operational constraints to be in effect during the fuel testing investigations. Also, the scope of testing program (which began in August 2009), including additional measurements and monitoring procedures, is described.

  8. Repair, Evaluation, Maintenance, and Rehabilitation Research Program. Geotechnical Aspects of Rock Erosion in Emergency Spillway Channels. Report 4. Geologic and Hydrodynamic Controls on the Mechanics of Knickpoint Migration

    DTIC Science & Technology

    1989-12-01

    approval of the use of such commercial products. rrf .A’cierated croulon at a knickpoint produced by relatively I’vi sch argi slid unventing beneath...Report 4 of a Series Approved For Public Releae, Distilbution Unlimited Prepared for DEPARTMENT OF THE ARMY US Army Corps of Engineers Washington, DC...20314-1000 Under Civil Works Work Unit 32317 90 0.1 16 0 7 C The following two letters used as parl of the number designating technical reports of

  9. Early experience in establishing and evaluating an ACGME-approved international general surgery rotation.

    PubMed

    Tarpley, Margaret; Hansen, Erik; Tarpley, John L

    2013-01-01

    In 2011, the Accreditation Council for Graduate Medical Education Surgery Residency Review Committee first provided guidelines for elective international general surgery rotations. The Vanderbilt general surgery residency program received Surgery Residency Review Committee approval for a fourth-year elective in Kenya beginning in the 2011-2012 academic year. Because this rotation would break ground culturally and geographically, and as an educational partnership, a briefing and debriefing process was developed for this ground-breaking year. Our objectives were to prepare residents to maximize the experience without competing for cases with local trainees or overburdening the host institution and to perform continuous quality assessment and improvement as each resident returned back. Briefing included health protection strategies, a procedures manual containing step-by-step preparation activities, and cultural-sensitivity training. Institutional Review Board exemption approval was obtained to administer a questionnaire created for returning residents concerning educational value, relations with local trainees, physical environment, and personal perceptions that would provide the scaffold for the debriefing conference. The questionnaire coupled with the debriefing discussion for the first 9 participants revealed overall satisfaction with the rotation and the briefing process, good health, and no duty hours or days-off issues. Other findings include the following: (1) emotional effect of observing African families weigh cost in medical decision making; (2) satisfactory access to educational resources; (3) significant exposure to specialties such as urology and radiology; and (4) toleration of 4 weeks as a single and expressed need for leisure activity materials such as books, DVDs, or games. The responses triggered adjustments in the briefing sessions and travel preparation. The host institution invited the residents to return for the 2012-2013 year as well as 2013-2014. Detailed preparation and the follow-up evaluation for assessment and improvement of this nascent international surgery experience are associated with resident satisfaction and the host institution has agreed to continue the rotation. Copyright © 2013 Association of Program Directors in Surgery. All rights reserved.

  10. 42 CFR 137.361 - Does the Secretary have any other opportunities to approve planning or design documents prepared...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in... opportunities to approve planning or design documents prepared by the Self-Governance Tribe? Yes, but only if...

  11. 78 FR 45231 - Medicare and Medicaid Programs; Initial Approval of Center for Improvement in Healthcare Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ....23(c)(1), CIHQ modified its standards to address biologicals. To meet the requirements at Sec. 482.23... sets, and protocols for orders related to the preparation and administration of drugs and biologicals... to limit the removal of drugs and biologicals from the pharmacy or storage area only by personnel...

  12. 30 CFR 936.15 - Approval of Oklahoma regulatory program amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... “surface coal mining operations”, 701.5: definitions of “coal preparation” and “coal preparation plant....11(b)(4), and part 702, concerning an exemption for operations when the extraction of coal is incidental to the extraction of other minerals. June 21, 1990 January 9, 1991 DOM/RR 772.12(b)(12); 773.5(a...

  13. 30 CFR 936.15 - Approval of Oklahoma regulatory program amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... “surface coal mining operations”, 701.5: definitions of “coal preparation” and “coal preparation plant....11(b)(4), and part 702, concerning an exemption for operations when the extraction of coal is incidental to the extraction of other minerals. June 21, 1990 January 9, 1991 DOM/RR 772.12(b)(12); 773.5(a...

  14. Air Force JROTC: Introduction and Information Brief

    DTIC Science & Technology

    2015-04-01

    Cadets, Prepared for the Future • Cadet Programs • Citizenship, leadership, academics, & extracurricular activities - our “Immersive Learning” tools...required Extracurricular Activities • Community Service Projects • Color Guard and Drill Teams • Marksmanship • Academic Bowl (SAT/ACT...optional & require principal approval Extracurricular Activities • New! Remote Controlled (RC) Multi-copters • Flight Simulators in Classrooms

  15. Big Data Analysis of Contractor Performance Information for Services Acquisition in DoD: A Proof of Concept

    DTIC Science & Technology

    2015-09-22

    PROGRAM SPONSORED REPORT SERIES Approved for public release; distribution is unlimited. Prepared for the Naval Postgraduate School, Monterey, CA...and has been awarded the Liskin Teaching Award two times in the past two years for his teaching efforts. Dr. Dixon is a co-editor of the Production...Full- time MBA programs. Prior to his career in academia, Dr. Apte worked for over 10 years in managing operations and information systems in the

  16. A Guidance Document for Kentucky's Oil and Gas Operators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bender, Rick

    The accompanying report, manual and assimilated data represent the initial preparation for submission of an Application for Primacy under the Class II Underground Injection Control (UIC) program on behalf of the Commonwealth of Kentucky. The purpose of this study was to identify deficiencies in Kentucky law and regulation that would prevent the Kentucky Division of Oil and Gas from receiving approval of primacy of the UIC program, currently under control of the United States Environmental Protection Agency (EPA) in Atlanta, Georgia.

  17. Viking Software Data

    DTIC Science & Technology

    1977-05-01

    RADC-TR-77-168 Final Technical Report M~ay 1977 ll VIKING SOF11WARE DATA Martin Marietta Corporation Approved for public release; distribution...practices employed on a large and complex system development by the Martin Marietta Corporation. The intent of the RADC program to which this document...the technique are described. The preparation of this report could not have been accomplished without considerable assistance from fellow Martin

  18. Chemical and Mechanical Characterization of Diamond-Like Carbon Hard Coatings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poker, D B; Doughty, C

    1999-12-28

    This CRADA was intended to investigate and optimize the process used by ASTEX-PlasmaQuest for deposition of diamond-like carbon films. Approval for funding was delayed, and an unexpected move of the PlasmaQuest headquarters and research facilities prevented appropriate samples from being prepared before the end of the CRADA. Therefore, No effort was expended under this program.

  19. --No Title--

    Science.gov Websites

    -- OAS Intranet -- Sunday 27 May 2018 Approved Program-Budget 2018 Proposed Program-Budget 2018 Approved Program-Budget 2017 Proposed Program-Budget 2017 Approved Program-Budget 2016 Proposed Program -Budget 2016 Approved Program-Budget 2015 Proposed Program-Budget 2015 Approved Program-Budget 2014

  20. Analysis of the Education Program Approval Process: A Program Evaluation.

    ERIC Educational Resources Information Center

    Fountaine, Charles A.; And Others

    A study of the education program approval process involving the Veterans Administration (VA) and the State Approving Agencies (SAAs) had the following objectives: to describe the present education program approval process; to determine time and costs associated with the education program approval process; to describe the approval process at…

  1. 30 CFR 18.96 - Preparation of machines for inspection; requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.96 Preparation of machines for inspection... place at which a field approval investigation will be conducted with respect to any machine, the...

  2. 30 CFR 18.96 - Preparation of machines for inspection; requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.96 Preparation of machines for inspection... place at which a field approval investigation will be conducted with respect to any machine, the...

  3. 40 CFR 282.73 - Minnesota State-Administered Program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.73 Minnesota State-Administered Program. (a) The State of Minnesota's underground storage tank program is approved in... chapter. EPA approved the Minnesota underground storage tank program on November 30, 2001, and approval...

  4. 40 CFR 282.73 - Minnesota State-Administered Program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.73 Minnesota State-Administered Program. (a) The State of Minnesota's underground storage tank program is approved in... chapter. EPA approved the Minnesota underground storage tank program on November 30, 2001, and approval...

  5. 40 CFR 282.73 - Minnesota State-Administered Program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.73 Minnesota State-Administered Program. (a) The State of Minnesota's underground storage tank program is approved in... chapter. EPA approved the Minnesota underground storage tank program on November 30, 2001, and approval...

  6. 40 CFR 282.73 - Minnesota State-Administered Program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.73 Minnesota State-Administered Program. (a) The State of Minnesota's underground storage tank program is approved in... chapter. EPA approved the Minnesota underground storage tank program on November 30, 2001, and approval...

  7. Limited Scope Design Study for Multi-Sensor Towbody

    DTIC Science & Technology

    2016-06-01

    FINAL REPORT Limited Scope Design Study for Multi-Sensor Towbody SERDP Project MR-2501 JUNE 2016 Dr. Kevin Williams Tim McGinnis...prepared under contract to the Department of Defense Strategic Environmental Research and Development Program (SERDP). The publication of this...Left Blank REPORT DOCUMENTATION PAGE Standard Form 298 (Rev. 8/98) Prescribed by ANSI Std. Z39.18 Form Approved OMB No. 0704-0188 The public

  8. Vertical Temperature Simulation of Pegasus Runway, McMurdo Station, Antarctica

    DTIC Science & Technology

    2015-01-01

    Report Approved for public release; distribution is unlimited. Prepared for National Science Foundation , Division of Polar Programs, Antarctic...45 ERDC/CRREL TR-15-2 vii Preface This study was conducted for the National Science Foundation (NSF), Di- vision of Polar...Development Center GPR Ground-Penetrating Radar MIS McMurdo Ice Self NSF National Science Foundation PIR Precision Infrared Radiometer PLR Division of

  9. Reconstructing the Prostate Cancer Transcriptional Regulatory Network

    DTIC Science & Technology

    2010-07-01

    the Medical Scientist Training Program. The funders had no role in study design , data collection and analysis , decision to publish, or preparation of...reverse analysis , building a cell line subtype classifier to classify 86 breast tumors (from the original Stanford/Norway study defining the five tumor...Army position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public

  10. Prostate Cancer Clinical Consortium Clinical Research Site: Targeted Therapies

    DTIC Science & Technology

    2017-10-01

    AWARD NUMBER: W81XWH-14-2-0159 TITLE: Prostate Cancer Clinical Consortium Clinical Research Site: Targeted Therapies PRINCIPAL INVESTIGATOR...Annual PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for...AND SUBTITLE Prostate Cancer Clinical Consortium Clinical Research Site: Targeted Therapies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT

  11. Helicopter Dynamic Performance Program. Volume 2. User’s Manual

    DTIC Science & Technology

    1980-07-01

    Technologies Corporation Stratford, Connecticut 06602 July 1980 Final Report / • ., . Approved for public release; I distribution unlimited. ; A - Prepared...for : APPLIED TECHNOLOGY LABORATORY U. S. ARMY RESEARCH AND TECHNOLOGY LABORATORIES (AVRADCOM) Fort Eustis, Va. 23604 80 8 27 D APPLIED TECHNOLOGY ... Technology Division. Technic31 review of this report was also pro- vided by Messrs. W_ A. Pleasants of Design Integration and Analysis Technical Area

  12. Report of the Defense Science Board Summer Study on Joint Service Acquisition Programs

    DTIC Science & Technology

    1984-02-01

    ENGINEERING Washington, D. C. 20301 r! OFFICE OF THE SECRETARY OF DEFENSE WASHINGTON, D.C. 20301 I 17 April 1984S DE FENSIE SCIENCE BOARD ?M~1RAN"~’ FOR i1Z...mended. Action: JCS, Services, and OSD prepare a JKN3 cur-Ler for Secretary De -fense approval. °’ B. NEW 5000 SERIES DIRECTIVE fRdcdmmmendet tion...requirements, program, acii ecliolv t lc., ron those candidates which possess the prere<isites for suct-e -ces I Joia •, Service acquisitions. The decision to

  13. 78 FR 17200 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ... Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Chemical Preparations... information about the electronic docket, go to www.regulations.gov . Title: NESHAP for Chemical Preparations.../Affected Entities: Owners or operators of area source chemical preparation facilities. Estimated Number of...

  14. The Army Materiel Requirements Documents: Qualitative Analysis of Efficiency and Effectiveness

    DTIC Science & Technology

    2013-06-30

    Business and Public Policy Naval Postgraduate School Approved for public release; distribution is unlimited. Prepared for the Naval Postgraduate...of Business and Public Policy,Monterey,CA,93943 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10...The research presented in this report was supported by the Acquisition Research Program of the Graduate School of Business & Public Policy at the

  15. A Measure of Effectiveness - Analysis and Application.

    DTIC Science & Technology

    1981-06-01

    PODELL UNCLASSIFIED DCEC-TN-I2-81 NLEEEllllllllllI IIIIIIIIII!I IIIIEIIIIIIII2 4 LEYEV AD A10788 6 TN 2-81 DEFENSE COMMUNICATIONS ENGINEERING CENTER...AUTOR~a)8. CONTRACT OR GRANT NUMBER(&) .OBERT PODELL 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT PROJECT, TASK AREA 6 WORK UNIT...APPLICATION JUNE 1981 Prepared by: @ Robert Podell Approved for Publication: G.E.LaVE-AN Chief, Systems Engineering Division FOREWORD The Defense

  16. 2011 Annual Criticality Safety Program Performance Summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andrea Hoffman

    The 2011 review of the INL Criticality Safety Program has determined that the program is robust and effective. The review was prepared for, and fulfills Contract Data Requirements List (CDRL) item H.20, 'Annual Criticality Safety Program performance summary that includes the status of assessments, issues, corrective actions, infractions, requirements management, training, and programmatic support.' This performance summary addresses the status of these important elements of the INL Criticality Safety Program. Assessments - Assessments in 2011 were planned and scheduled. The scheduled assessments included a Criticality Safety Program Effectiveness Review, Criticality Control Area Inspections, a Protection of Controlled Unclassified Information Inspection,more » an Assessment of Criticality Safety SQA, and this management assessment of the Criticality Safety Program. All of the assessments were completed with the exception of the 'Effectiveness Review' for SSPSF, which was delayed due to emerging work. Although minor issues were identified in the assessments, no issues or combination of issues indicated that the INL Criticality Safety Program was ineffective. The identification of issues demonstrates the importance of an assessment program to the overall health and effectiveness of the INL Criticality Safety Program. Issues and Corrective Actions - There are relatively few criticality safety related issues in the Laboratory ICAMS system. Most were identified by Criticality Safety Program assessments. No issues indicate ineffectiveness in the INL Criticality Safety Program. All of the issues are being worked and there are no imminent criticality concerns. Infractions - There was one criticality safety related violation in 2011. On January 18, 2011, it was discovered that a fuel plate bundle in the Nuclear Materials Inspection and Storage (NMIS) facility exceeded the fissionable mass limit, resulting in a technical safety requirement (TSR) violation. The TSR limits fuel plate bundles to 1085 grams U-235, which is the maximum loading of an ATR fuel element. The overloaded fuel plate bundle contained 1097 grams U-235 and was assembled under an 1100 gram U-235 limit in 1982. In 2003, the limit was reduced to 1085 grams citing a new criticality safety evaluation for ATR fuel elements. The fuel plate bundle inventories were not checked for compliance prior to implementing the reduced limit. A subsequent review of the NMIS inventory did not identify further violations. Requirements Management - The INL Criticality Safety program is organized and well documented. The source requirements for the INL Criticality Safety Program are from 10 CFR 830.204, DOE Order 420.1B, Chapter III, 'Nuclear Criticality Safety,' ANSI/ANS 8-series Industry Standards, and DOE Standards. These source requirements are documented in LRD-18001, 'INL Criticality Safety Program Requirements Manual.' The majority of the criticality safety source requirements are contained in DOE Order 420.1B because it invokes all of the ANSI/ANS 8-Series Standards. DOE Order 420.1B also invokes several DOE Standards, including DOE-STD-3007, 'Guidelines for Preparing Criticality Safety Evaluations at Department of Energy Non-Reactor Nuclear Facilities.' DOE Order 420.1B contains requirements for DOE 'Heads of Field Elements' to approve the criticality safety program and specific elements of the program, namely, the qualification of criticality staff and the method for preparing criticality safety evaluations. This was accomplished by the approval of SAR-400, 'INL Standardized Nuclear Safety Basis Manual,' Chapter 6, 'Prevention of Inadvertent Criticality.' Chapter 6 of SAR-400 contains sufficient detail and/or reference to the specific DOE and contractor documents that adequately describe the INL Criticality Safety Program per the elements specified in DOE Order 420.1B. The Safety Evaluation Report for SAR-400 specifically recognizes that the approval of SAR-400 approves the INL Criticality Safety Program. No new source requirements were released in 2011. A revision to LRD-18001 is planned for 2012 to clarify design requirements for criticality alarms. Training - Criticality Safety Engineering has developed training and provides training for many employee positions, including fissionable material handlers, facility managers, criticality safety officers, firefighters, and criticality safety engineers. Criticality safety training at the INL is a program strength. A revision to the training module developed in 2010 to supplement MFC certified fissionable material handlers (operators) training was prepared and presented in August of 2011. This training, 'Applied Science of Criticality Safety,' builds upon existing training and gives operators a better understanding of how their criticality controls are derived. Improvements to 00INL189, 'INL Criticality Safety Principles' are planned for 2012 to strengthen fissionable material handler training.« less

  17. 30 CFR 946.15 - Approval of Virginia regulatory program amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...,” “coal preparation plant”. November 8, 1985 November 25, 1986 VR 480-03-19: 700 through 850; techniques... VR 480-03-19: 784.20(f)(2); 817.121(c)(2). January 16, 1987 August 17, 1987 VR 480-03-19.801.13(a)(2), .17(a). June 15, 1987, July 2, 1987 December 31, 1987 VA Code §§ 45.1-270.3:1, .4, .5:1, .6B; VR 480...

  18. 30 CFR 946.15 - Approval of Virginia regulatory program amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...,” “coal preparation plant”. November 8, 1985 November 25, 1986 VR 480-03-19: 700 through 850; techniques... VR 480-03-19: 784.20(f)(2); 817.121(c)(2). January 16, 1987 August 17, 1987 VR 480-03-19.801.13(a)(2), .17(a). June 15, 1987, July 2, 1987 December 31, 1987 VA Code §§ 45.1-270.3:1, .4, .5:1, .6B; VR 480...

  19. Kuroshio Transport East of Taiwan and the Effect of Mesoscale Eddies

    DTIC Science & Technology

    2013-09-30

    1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Kuroshio Transport East of Taiwan and the Effect of...00-00-2013 to 00-00-2013 4. TITLE AND SUBTITLE Kuroshio Transport East of Taiwan and the Effect of Mesoscale Eddies 5a. CONTRACT NUMBER 5b...COMPLETED In preparation for the field program, Vegan Mensah, a Ph.D. student from NTU, visited the Woods Hole Oceaongraphic Institution (WHOI) for two

  20. Rapid Prototyping of Application Specific Signal Processors Program

    DTIC Science & Technology

    1992-10-09

    EREQ Query optimizer generator from the University of Colorado. In the five year time frame , this trend toward convergence makes it a non- issue ...related issues . TI’s RASSP vision plans to leverage and support CALS as a baseline for addressing data formatting and handling. Previously stated CALS goals ...of the U.S. Gc;:zrnrenL Distibution Statement A. Approved for public release; distribution is unlimited. Prepared By: _-- Texas Instruments Integrated

  1. Electrically Conducting Polyaniline Microtube Blends

    DTIC Science & Technology

    2004-08-01

    SMC-TR-05-01 AEROSPACE REPORT NO. TR-2004(8565)-4 Electrically Conducting Polyaniline Microtube Blends 1 August 2004 Prepared by A. R. HOPKINS, R. A...It is published only for the exchange and stimulation of ideas. Michael Zambrana SMC/AXE Form Approved REPORT DOCUMENTATION PAGE OMB No. 0704-0188...0001 Electrically Conducting Polyaniline Microtube Blends 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER A. R. Hopkins, R

  2. Therapeutic Targeting of Lipid Droplets as Disease Markers in Ovarian Cancer

    DTIC Science & Technology

    2016-03-01

    COVERED (From - To) 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 5f...CONTENTS Page # INTRODUCTION 2 KEYWORDS 2 PROJECT SUMMARY 2-9 KEY RESEARCH ACCOMPLISHMENTS 10 CONCLUSION AND FUTIRE PLANS 10 PUBLICATION/ABSTRACTS...Time to Recurrence, PFS- Progression Free Survival, OS-Overall Survival 3. OVERALL PROJECT SUMMARY: Milestone 1: Animal Use Approval-Prepare IACUC

  3. International Academy of Astronautics 5th cosmic study—preparing for a 21st century program of integrated, Lunar and Martian exploration and development (executive summary)

    NASA Astrophysics Data System (ADS)

    Koelle, H. H.; Stephenson, D. G.

    2003-04-01

    This report is an initial review of plans for a extensive program to survey and develop the Moon and to explore the planet Mars during the 21st century. It presents current typical plans for separate, associated and fully integrated programs of Lunar and Martian research, exploration and development, and concludes that detailed integrated plans must be prepared and be subject to formal criticism. Before responsible politicians approve a new thrust into space they will demand attractive, defensible, and detailed proposals that explain the WHEN, HOW and WHY of each stage of an expanded program of 21st century space research, development and exploration. In particular, the claims of daring, innovative, but untried systems must be compared with the known performance of existing technologies. The time has come to supersede the present haphazard approach to strategic space studies with a formal international structure to plan for future advanced space missions under the aegis of the world's national space agencies, and supported by governments and the corporate sector.

  4. 50 CFR 15.26 - Approval of cooperative breeding programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... WILDLIFE AND PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.26 Approval of cooperative breeding programs. Upon receipt of a complete application, the Director... 50 Wildlife and Fisheries 1 2011-10-01 2011-10-01 false Approval of cooperative breeding programs...

  5. 40 CFR 282.61 - Hawaii State-Administered Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Hawaii State-Administered Program. 282... (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.61 Hawaii State-Administered Program. (a) The State of Hawaii's underground storage tank program is approved in lieu of the...

  6. 7 CFR 205.622 - Review of approved State organic programs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) ORGANIC FOODS PRODUCTION ACT PROVISIONS NATIONAL ORGANIC PROGRAM Administrative State Organic Programs § 205.622 Review of approved State organic programs. The Secretary will review a State organic program... 7 Agriculture 3 2010-01-01 2010-01-01 false Review of approved State organic programs. 205.622...

  7. 9 CFR 590.435 - Wholesomeness and approval of materials.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... materials. (a) Substances and ingredients used in the manufacture or preparation of any egg product capable... purpose of its use. (c) Chemical additives to be used in the preparation of egg products will be approved... adulterated or unwholesome. Scientific data acceptable to the Administrator showing that the additive meets...

  8. 14 CFR 142.37 - Approval of flight aircrew training program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES TRAINING CENTERS Aircrew Curriculum and... the Administrator for training program approval. (b) A curriculum approved under SFAR 58 of part 121... application for training program approval must indicate— (1) Which courses are part of the core curriculum and...

  9. 15 CFR 923.131 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the requirements for review of approved State coastal zone management (CZM) programs pursuant to... approved coastal zone management program or a portion of such program; and (d) Withdrawing program approval... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL...

  10. 15 CFR 923.131 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the requirements for review of approved State coastal zone management (CZM) programs pursuant to... approved coastal zone management program or a portion of such program; and (d) Withdrawing program approval... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL...

  11. IFNA approved Chinese Anaesthesia Nurse Education Program: A Delphi method.

    PubMed

    Hu, Jiale; Fallacaro, Michael D; Jiang, Lili; Wu, Junyan; Jiang, Hong; Shi, Zhen; Ruan, Hong

    2017-09-01

    Numerous nurses work in operating rooms and recovery rooms or participate in the performance of anaesthesia in China. However, the scope of practice and the education for Chinese Anaesthesia Nurses is not standardized, varying from one geographic location to another. Furthermore, most nurses are not trained sufficiently to provide anaesthesia care. This study aimed to develop the first Anaesthesia Nurse Education Program in Mainland China based on the Educational Standards of the International Federation of Nurse Anaesthetists. The Delphi technique was applied to develop the scope of practice, competencies for Chinese Anaesthesia Nurses and education program. In 2014 the Anaesthesia Nurse Education Program established by the hospital applied for recognition by the International Federation of Nurse Anaesthetists. The Program's curriculum was evaluated against the IFNA Standards and recognition was awarded in 2015. The four-category, 50-item practice scope, and the three-domain, 45-item competency list were identified for Chinese Anaesthesia Nurses. The education program, which was established based on the International Federation of Nurse Anaesthetists educational standards and Chinese context, included nine curriculum modules. In March 2015, 13 candidates received and passed the 21-month education program. The Anaesthesia Nurse Education Program became the first program approved by the International Federation of Nurse Anaesthetists in China. Policy makers and hospital leaders can be confident that anaesthesia nurses graduating from this Chinese program will be prepared to demonstrate high level patient care as reflected in the recognition by IFNA of their adoption of international nurse anaesthesia education standards. Copyright © 2017 Elsevier Ltd. All rights reserved.

  12. 77 FR 59879 - Idaho: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... ``Approved State Hazardous Waste Management Programs,'' Idaho's authorized hazardous waste program. The EPA... Federal Register, the EPA is codifying and incorporating by reference the State's hazardous waste program...

  13. 77 FR 70783 - Medicare and Medicaid Programs; Approval of the Accreditation Association for Ambulatory Health...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ...] Medicare and Medicaid Programs; Approval of the Accreditation Association for Ambulatory Health Care (AAAHC... announces our decision to approve the Accreditation Association for Ambulatory Health Care (AAAHC) for... Ambulatory Health Care's (AAAHC) current term of approval for their ASC accreditation program expires on...

  14. Manufacturing Methods and Technology (MM&T) Program. 10.6 Micrometer Carbon Dioxide TEA (Transverely Excited Atmospheric) Lasers

    DTIC Science & Technology

    1983-06-01

    TBE LV I R , VA 22060 DISTRIBUTION STATEMENT s Approved for public release, distribution unlimited. Prepared by DR. CLARENCE F. LUCK RAYTHEON COMPANY0...Polaroid photographic records of interferograms of test optical elements. xvii/xviii . i .’’ . r *’. ~ ~ s . -’- * INTRODUCTION/SUMMARY In April 1981...SEPTUM Q LASER-SIDE VALVE PINCH-OFF TUBES O oo LASER EOA-3224 Figure 7. Laser Plumbing 16 I .4. . I 4",’ : ."," , r

  15. A Design-Aid and Cost Estimate Model for Suppressive Shielding Structures

    DTIC Science & Technology

    1975-12-01

    Final Report APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIM4ITED Prepared for SAFETY ENGINEERING GRADUATE PROGRAM AND TEXAS A&1-., UNIVERSITY USAVC...Coinryuter Science Department, Texas A&1.! ’ University . 19. KEY dVOIRS (Continue an rcverse siJ~e it necessary mind lde.ifily by block lumber...1473 EDITION OF T NOV 65 IS 005OLETE SE.CURITY CLASSIFICATION OF TkIS PACE (Whtin Pa&121. ~t. SECUnITY CLASSIFICATION OF THIS PAGE(W4uio DOl’ Enteted

  16. 40 CFR 282.87 - Oregon State-Administered Program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Oregon State-Administered Program. 282... (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.87 Oregon State-Administered Program. (a) The State of Oregon is approved to administer and enforce an underground storage tank...

  17. 40 CFR 282.87 - Oregon State-Administered Program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Oregon State-Administered Program. 282... (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.87 Oregon State-Administered Program. (a) The State of Oregon is approved to administer and enforce an underground storage tank...

  18. 40 CFR 282.87 - Oregon State-Administered Program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Oregon State-Administered Program. 282... (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.87 Oregon State-Administered Program. (a) The State of Oregon is approved to administer and enforce an underground storage tank...

  19. 38 CFR 21.9765 - Program of education approval.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Program of education... (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Approval of Programs of Education § 21.9765 Program of education approval. VA may provide educational assistance for pursuit of a program of...

  20. 40 CFR 282.81 - New Mexico State-Administered Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false New Mexico State-Administered Program... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.81 New Mexico State-Administered Program. (a) The State of New Mexico is approved to administer and enforce an...

  1. 38 CFR 21.9765 - Program of education approval.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Program of education... (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Approval of Programs of Education § 21.9765 Program of education approval. VA may provide educational assistance for pursuit of a program of...

  2. 38 CFR 21.9765 - Program of education approval.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Program of education... (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Approval of Programs of Education § 21.9765 Program of education approval. VA may provide educational assistance for pursuit of a program of...

  3. 38 CFR 21.9765 - Program of education approval.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Program of education... (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Approval of Programs of Education § 21.9765 Program of education approval. VA may provide educational assistance for pursuit of a program of...

  4. 40 CFR 282.81 - New Mexico State-Administered Program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false New Mexico State-Administered Program... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.81 New Mexico State-Administered Program. (a) The State of New Mexico is approved to administer and enforce an...

  5. 38 CFR 21.9765 - Program of education approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Program of education... (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Approval of Programs of Education § 21.9765 Program of education approval. VA may provide educational assistance for pursuit of a program of...

  6. 40 CFR 282.81 - New Mexico State-Administered Program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false New Mexico State-Administered Program... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.81 New Mexico State-Administered Program. (a) The State of New Mexico is approved to administer and enforce an...

  7. 40 CFR 282.81 - New Mexico State-Administered Program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false New Mexico State-Administered Program... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.81 New Mexico State-Administered Program. (a) The State of New Mexico is approved to administer and enforce an...

  8. 40 CFR 282.81 - New Mexico State-Administered Program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false New Mexico State-Administered Program... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.81 New Mexico State-Administered Program. (a) The State of New Mexico is approved to administer and enforce an...

  9. 5 CFR 412.301 - Obtaining approval to conduct a Senior Executive Service candidate development program (SESCDP).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Obtaining approval to conduct a Senior... DEVELOPMENT Senior Executive Service Candidate Development Programs § 412.301 Obtaining approval to conduct a Senior Executive Service candidate development program (SESCDP). (a) An SESCDP is an OPM-approved...

  10. International Academy of Astronautics 5th cosmic study--preparing for a 21st century program of integrated, Lunar and Martian exploration and development (executive summary).

    PubMed

    Koelle, H H; Stephenson, D G

    2003-04-01

    This report is an initial review of plans for a extensive program to survey and develop the Moon and to explore the planet Mars during the 21st century. It presents current typical plans for separate, associated and fully integrated programs of Lunar and Martian research, exploration and development, and concludes that detailed integrated plans must be prepared and be subject to formal criticism. Before responsible politicians approve a new thrust into space they will demand attractive, defensible, and detailed proposals that explain the WHEN, HOW and WHY of each stage of an expanded program of 21st century space research, development and exploration. In particular, the claims of daring, innovative, but untried systems must be compared with the known performance of existing technologies. The time has come to supersede the present haphazard approach to strategic space studies with a formal international structure to plan for future advanced space missions under the aegis of the world's national space agencies, and supported by governments and the corporate sector. c2002 Elsevier Science Ltd. All rights reserved.

  11. Trends in utilization of FDA expedited drug development and approval programs, 1987-2014: cohort study.

    PubMed

    Kesselheim, Aaron S; Wang, Bo; Franklin, Jessica M; Darrow, Jonathan J

    2015-09-23

    To evaluate the use of special expedited development and review pathways at the US Food and Drug Administration over the past two decades. Cohort study. FDA approved novel therapeutics between 1987 and 2014. Publicly available sources provided each drug's year of approval, their innovativeness (first in class versus not first in class), World Health Organization Anatomic Therapeutic Classification, and which (if any) of the FDA's four primary expedited development and review programs or designations were associated with each drug: orphan drug, fast track, accelerated approval, and priority review. Logistic regression models evaluated trends in the proportion of drugs associated with each of the four expedited development and review programs. To evaluate the number of programs associated with each approved drug over time, Poisson models were employed, with the number of programs as the dependent variable and a linear term for year of approval. The difference in trends was compared between drugs that were first in class and those that were not. The FDA approved 774 drugs during the study period, with one third representing first in class agents. Priority review (43%) was the most prevalent of the four programs, with accelerated approval (9%) the least common. There was a significant increase of 2.6% per year in the number of expedited review and approval programs granted to each newly approved agent (incidence rate ratio 1.026, 95% confidence interval 1.017 to 1.035, P<0.001), and a 2.4% increase in the proportion of drugs associated with at least one such program (odds ratio 1.024, 95% confidence interval 1.006 to 1.043, P=0.009). Driving this trend was an increase in the proportion of approved, non-first in class drugs associated with at least one program for drugs (P=0.03 for interaction). In the past two decades, drugs newly approved by the FDA have been associated with an increasing number of expedited development or review programs. Though expedited programs should be strictly limited to drugs providing noticeable clinical advances, this trend is being driven by drugs that are not first in class and thus potentially less innovative. © Kesselheim et al 2015.

  12. RH Packaging Program Guidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Washington TRU Solutions, LLC

    The purpose of this program guidance document is to provide technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the SARP and/or C of C shall govern. The C of C states: ''...each package must be prepared for shipment and operated in accordance with themore » procedures described in Chapter 7.0, ''Operating Procedures,'' of the application.'' It further states: ''...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, ''Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC approved, users need to be familiar with 10 CFR {section} 71.11, ''Deliberate Misconduct.'' Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions. Following these instructions assures that operations are safe and meet the requirements of the SARP. This document is available on the Internet at: ttp://www.ws/library/t2omi/t2omi.htm. Users are responsible for ensuring they are using the current revision and change notices. Sites may prepare their own document using the word-for-word steps in th is document, in sequence, including Notes and cautions. Site specific information may be included as necessary. The document, and revisions, must then be submitted to CBFO at sitedocuments@wipp.ws for approval. A copy of the approval letter from CBFO shall be available for audit purposes. Users may develop site-specific procedures addressing preoperational activities, quality assurance (QA), hoisting and rigging, and radiation health physics to be used with the instructions contained in this document. Users may recommend changes to this document by submitting their recommendations (in writing) to the WIPP M&O Contractor RH Packaging Maintenance Engineer for evaluation. If approved, the change(s) will be incorporated into this document for use by ALL users. Before first use and every 12 months after, user sites will be audited to this document to ensure compliance. They will also be audited within one year from the effective date of revisions to this document.« less

  13. Preparation of medicines for children - a hierarchy of classification.

    PubMed

    Ernest, Terry B; Craig, Jo; Nunn, Anthony; Salunke, Smita; Tuleu, Catherine; Breitkreutz, Joerg; Alex, Rainer; Hempenstall, John

    2012-10-05

    There is some confusion about the types of paediatric pharmaceutical preparation (in a regulatory and pharmaceutical development context) that are acceptable for approval by medicines regulators. Some of the confusion relates to terminology which may mean different things to different stakeholders. It may not always be possible to provide authorised, commercially manufactured, age appropriate, ready-to-administer preparations. In terms of assurance of quality and bioavailability there is a continuum from this ideal through intermediate products through authorised compounding and manipulation of commercial dosage forms to ad hoc compounding using only the skills and experience of the individual pharmacist. Additionally, it is widely known that caregivers may manipulate medicines at home, for example by segmenting tablets and by addition to foods or liquids. The first intent of the manufacturer should be to provide for children an age appropriate, ready-to-administer preparation which is commercially manufactured and approved by the competent authorities. However, there will still be a place for providing other age appropriate preparations such as approved products that are 'intermediates' requiring reconstitution before use, or instructions for compounding or manipulation of a dosage form. If compounding or manipulation is likely to be required it is preferable that data are generated by Industry, approved by the competent authorities and provided in the Summary of Product Characteristics (SmPC). It is acknowledged however, that ad hoc compounding or manipulation may also take place in certain circumstances such as logistical difficulties or to satisfy the needs of the child who does not find the authorised product to be 'age appropriate'. This paper explores compounding and manipulation of medicines in relation to approval by medicines regulators and non-approved preparation to fulfil the needs of the individual patient. Definitions are proposed to provide a hierarchical classification based on assurances of quality and bioavailability. Copyright © 2012 Elsevier B.V. All rights reserved.

  14. 14 CFR 61.71 - Graduates of an approved training program other than under this part: Special rules.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Graduates of an approved training program... GROUND INSTRUCTORS Aircraft Ratings and Pilot Authorizations § 61.71 Graduates of an approved training program other than under this part: Special rules. (a) A person who graduates from an approved training...

  15. 14 CFR 61.71 - Graduates of an approved training program other than under this part: Special rules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Graduates of an approved training program... GROUND INSTRUCTORS Aircraft Ratings and Pilot Authorizations § 61.71 Graduates of an approved training program other than under this part: Special rules. (a) A person who graduates from an approved training...

  16. 14 CFR 61.71 - Graduates of an approved training program other than under this part: Special rules.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Graduates of an approved training program... GROUND INSTRUCTORS Aircraft Ratings and Pilot Authorizations § 61.71 Graduates of an approved training program other than under this part: Special rules. (a) A person who graduates from an approved training...

  17. 14 CFR 61.71 - Graduates of an approved training program other than under this part: Special rules.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Graduates of an approved training program... GROUND INSTRUCTORS Aircraft Ratings and Pilot Authorizations § 61.71 Graduates of an approved training program other than under this part: Special rules. (a) A person who graduates from an approved training...

  18. 14 CFR 61.71 - Graduates of an approved training program other than under this part: Special rules.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Graduates of an approved training program... GROUND INSTRUCTORS Aircraft Ratings and Pilot Authorizations § 61.71 Graduates of an approved training program other than under this part: Special rules. (a) A person who graduates from an approved training...

  19. Case Studies in Application of System Engineering Practices to Capstone Projects

    NASA Technical Reports Server (NTRS)

    Murphy, Gloria; vanSusante, Paul; Carmen, Christina; Morris, Tommy; Schmidt, Peter; Zalewski, Janusz

    2011-01-01

    The Exploration Systems Mission Directorate (ESMD) of the National Aeronautics and Space Administration (NASA) sponsors a faculty fellowship program that engages researchers with interests aligned with current ESMD development programs. The faculty-members are committed to run a capstone senior design project based- on the materials and experience gained during the fellowship. For the 2010 - 2011 academic year, 5 projects were approved. These projects are in the areas of mechanical and electrical hardware design and optimization, fault prediction and extra planetary civil site preparation. This work summarizes the projects, describes the student teams performing the work, and comments on the integration of Systems Engineering principles into the projects, as well as the affected course curriculums.

  20. AOA Approval of ACGME Internship and Residency Training.

    PubMed

    Duffy, Thomas; Martinez, Bulmaro

    2011-04-01

    Since the 1970s, the American Osteopathic Association (AOA) has provided a means for osteopathic physicians to apply for approval of their postdoctoral training in programs accredited by the Accreditation Council for Graduate Medical Education (ACGME). Osteopathic physicians who trained in ACGME programs need this approval to meet AOA licensure and board certification requirements. The AOA approves ACGME residency training with several different approval processes. Approval of the first year of postdoctoral training occurs through Resolution 42, specialty approval (for specialties in which the first year of training is part of the residency), or federal or military training approval. For residency training, the AOA verifies successful completion of an ACGME training program before approving the training. The AOA is using customer surveys and online applications to improve the review process for applicants.

  1. 25 CFR 273.17 - Programs approved by Indian Education Committee.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) Programs developed or approved by the Indian Education Committee pursuant to this part may, at the option... 25 Indians 1 2011-04-01 2011-04-01 false Programs approved by Indian Education Committee. 273.17... EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.17...

  2. 25 CFR 273.17 - Programs approved by Indian Education Committee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) Programs developed or approved by the Indian Education Committee pursuant to this part may, at the option... 25 Indians 1 2010-04-01 2010-04-01 false Programs approved by Indian Education Committee. 273.17... EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.17...

  3. 77 FR 52758 - Agency Information Collection Activities under OMB Review; Renewal of a Currently Approved...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... OMB Review; Renewal of a Currently Approved Collection; Reclamation Rural Water Supply Program AGENCY... and Budget (OMB) for review and approval: Reclamation Rural Water Supply Program, OMB Control Number... Supply Program (Rural Water Program) to submit information to allow the Bureau of Reclamation to evaluate...

  4. 30 CFR 931.15 - Approval of New Mexico regulatory program amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of New Mexico regulatory program..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE NEW MEXICO § 931.15 Approval of New Mexico regulatory program amendments. The following is a list of the dates...

  5. 30 CFR 931.15 - Approval of New Mexico regulatory program amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of New Mexico regulatory program..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE NEW MEXICO § 931.15 Approval of New Mexico regulatory program amendments. The following is a list of the dates...

  6. 30 CFR 931.15 - Approval of New Mexico regulatory program amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of New Mexico regulatory program..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE NEW MEXICO § 931.15 Approval of New Mexico regulatory program amendments. The following is a list of the dates...

  7. 30 CFR 931.15 - Approval of New Mexico regulatory program amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of New Mexico regulatory program..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE NEW MEXICO § 931.15 Approval of New Mexico regulatory program amendments. The following is a list of the dates...

  8. The Method of Multiple Spatial Planning Basic Map

    NASA Astrophysics Data System (ADS)

    Zhang, C.; Fang, C.

    2018-04-01

    The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.

  9. The New Accreditation Council for Graduate Medical Education Next Accreditation System Milestones Evaluation System: What Is Expected and How Are Plastic Surgery Residency Programs Preparing?

    PubMed

    Sillah, Nyama M; Ibrahim, Ahmed M S; Lau, Frank H; Shah, Jinesh; Medin, Caroline; Lee, Bernard T; Lin, Samuel J

    2015-07-01

    The Accreditation Council for Graduate Medical Education Next Accreditation System milestones were implemented for plastic surgery programs in July of 2014. Forward progress through the milestones is an indicator of trainee-appropriate development, whereas regression or stalling may indicate the need for concentrated, targeted training. Online software at www.surveymonkey.com was used to create a survey about the program's approaches to milestones and was distributed to program directors and administrators of 96 Accreditation Council for Graduate Medical Education-approved plastic surgery programs. The authors had a 63.5 percent response rate (61 of 96 plastic surgery programs). Most programs report some level of readiness, only 22 percent feel completely prepared for the Next Accreditation System milestones, and only 23 percent are completely satisfied with their planned approach for compliance. Seventy-five percent of programs claim to be using some form of electronic tracking system. Programs plan to use multiple tools to capture and report milestone data. Most programs (44.4 percent) plan to administer evaluations at the end of each rotation. Over 70 percent of respondents believe that the milestones approach would improve the quality of resident training. However, programs were less than confident that their current compliance systems would live up to their full potential. The Next Accreditation System has been implemented nationwide for plastic surgery training programs. Milestone-based resident training is a new paradigm for residency training evaluation; programs are in the process of making this transition to find ways to make milestone data meaningful for faculty and residents.

  10. Tanks Focus Area Site Needs Assessment - FY 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.

    2001-04-30

    The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less

  11. 78 FR 65419 - Approval of Noise Compatibility Program for Tucson International Airport, Tucson, Arizona

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ... demonstrated noise benefit to noncompatible land uses exposed to noise levels in the yearly day/night average... provision of the Act to approve or disapprove the program within 180 days (other than the use of new or...-day period shall be deemed to be an approval of such program. The Noise Compatibility Program...

  12. 14 CFR 121.407 - Training program: Approval of airplane simulators and other training devices.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Training program: Approval of airplane... Program § 121.407 Training program: Approval of airplane simulators and other training devices. (a) Each airplane simulator and other training device that is used in a training course permitted under § 121.409...

  13. 14 CFR 121.407 - Training program: Approval of airplane simulators and other training devices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Training program: Approval of airplane... Program § 121.407 Training program: Approval of airplane simulators and other training devices. (a) Each airplane simulator and other training device that is used in a training course permitted under § 121.409...

  14. 14 CFR 121.407 - Training program: Approval of airplane simulators and other training devices.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Training program: Approval of airplane... Program § 121.407 Training program: Approval of airplane simulators and other training devices. (a) Each airplane simulator and other training device that is used in a training course permitted under § 121.409...

  15. 14 CFR 121.407 - Training program: Approval of airplane simulators and other training devices.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Training program: Approval of airplane... Program § 121.407 Training program: Approval of airplane simulators and other training devices. Link to an amendment published at 78 FR 67836, Nov. 12, 2013. (a) Each airplane simulator and other training device...

  16. 14 CFR 121.407 - Training program: Approval of airplane simulators and other training devices.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Training program: Approval of airplane... Program § 121.407 Training program: Approval of airplane simulators and other training devices. (a) Each airplane simulator and other training device that is used in a training course permitted under § 121.409...

  17. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Approved aircraft inspection program. 135...

  18. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Approved aircraft inspection program. 135...

  19. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Approved aircraft inspection program. 135...

  20. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Approved aircraft inspection program. 135...

  1. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Approved aircraft inspection program. 135...

  2. The New Drug Conditional Approval Process in China: Challenges and Opportunities.

    PubMed

    Yao, Xuefang; Ding, Jinxi; Liu, Yingfang; Li, Penghui

    2017-05-01

    Our aim was to characterize the newly established new drug conditional approval process in China and discuss the challenges and opportunities with respect to new drug research and development and registration. We examined the new approval program through literature review, law analysis, and data analysis. Data were derived from published materials, such as journal articles, government publications, press releases, and news articles, along with statistical data from INSIGHT-China Pharma Databases, the China Food and Drug Administration website, the Center for Drug Evaluation website, the US Food and Drug Administration website, and search results published by Google. Currently, there is a large backlog of New Drug Applications in China, mainly because of the prolonged review time at the China Food and Drug Administration, resulting in a lag in drug approvals. In 2015, the Chinese government implemented the drug review and registration system reform and tackled this issue through various approaches, such as setting up a drug review fee system, adjusting the drug registration classification, and establishing innovative review pathways, including the conditional approval process. In Europe and the United States, programs comparable to the conditional approval program in China have been well developed. The conditional approval program recently established in China is an expedited new drug approval process that is expected to affect new drug development at home and abroad and profoundly influence the public health and the pharmaceutical industry in China. Like any program in its initial stage, the conditional approval program is facing several challenges, including setting up a robust system, formatting new drug clinical research requirements, and improving the regulatory agency's function for drug review and approval. The program is expected to evolve and improve as part of the government mandate of the drug registration system reform. Copyright © 2017 Elsevier HS Journals, Inc. All rights reserved.

  3. 77 FR 43136 - Approval of Noise Compatibility Program for Philadelphia International Airport, Philadelphia, PA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... have a measureable noise benefit to sensitive land uses within the Day-Night Level (DNL) 65 decibel... a provision of the Act to approve or disapprove the program within 180 days (other than the use of... within the 180-day period shall be deemed to be an approval of such program. The submitted program...

  4. 40 CFR 52.1019 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...), (C) only as it relates to the PSD program, (D)(i)(II) only as it relates to the PSD program, (D)(ii), (E)(ii), and (J) only as it relates to the PSD program. This conditional approval is contingent upon... conditionally approved for CAA elements 110(a)(2)(A), (C) only as it relates to the PSD program, (D)(i)(II) only...

  5. 40 CFR 52.1019 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...), (C) only as it relates to the PSD program, (D)(i)(II) only as it relates to the PSD program, (D)(ii), (E)(ii), and (J) only as it relates to the PSD program. This conditional approval is contingent upon... conditionally approved for CAA elements 110(a)(2)(A), (C) only as it relates to the PSD program, (D)(i)(II) only...

  6. 78 FR 34089 - Revision of a Currently Approved Information Collection for the Energy Efficiency and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... Approved Information Collection for the Energy Efficiency and Conservation Block Grant Program Status... guidance concerning the Energy Efficiency and Conservation Block Grant (EECBG) Program is available for... Conservation Block Grant (EECBG) Program Status Report''; (3) Type of Review: Revision of currently approved...

  7. 14 CFR 142.37 - Approval of flight aircrew training program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... application for training program approval must indicate— (1) Which courses are part of the core curriculum and... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Approval of flight aircrew training program... TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES TRAINING CENTERS Aircrew Curriculum and...

  8. 77 FR 73316 - Approval of Air Quality Implementation Plans; California; Eastern Kern, Imperial, Placer, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... adopt and implement a SIP- approved Prevention of Significant Deterioration (PSD) permit program. We are...--Prevention of Significant Deterioration (PSD) Permit Program, PCAPCD Rule 518--Prevention of Significant Deterioration (PSD) Permit Program, and YSAQMD Rule 3.24-- Prevention of Significant Deterioration. The approval...

  9. 75 FR 53220 - Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ...] Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... approved municipal solid waste landfill (MSWLF) program. The approved modification allows the State to..., and demonstration (RD&D) permits to be issued to certain municipal solid waste landfills by approved...

  10. 42 CFR 137.360 - Does the Secretary approve project planning and design documents prepared by the Self-Governance...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Does the Secretary approve project planning and design documents prepared by the Self-Governance Tribe? 137.360 Section 137.360 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE...

  11. 42 CFR 137.360 - Does the Secretary approve project planning and design documents prepared by the Self-Governance...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Does the Secretary approve project planning and design documents prepared by the Self-Governance Tribe? 137.360 Section 137.360 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE...

  12. 42 CFR 137.361 - Does the Secretary have any other opportunities to approve planning or design documents prepared...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Does the Secretary have any other opportunities to approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL...

  13. 42 CFR 137.361 - Does the Secretary have any other opportunities to approve planning or design documents prepared...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Does the Secretary have any other opportunities to approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL...

  14. 77 FR 3241 - Intent To Hold North Dakota Task Force Meeting as Established by the Missouri River Protection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-23

    ... duties of the Task Force are to prepare and approve a plan for the use of the funds made available under... of the Task Force are to prepare and approve a plan for the use of the funds made available under... Force Meeting as Established by the Missouri River Protection and Improvement Act of 2000 (Title VII...

  15. 40 CFR 52.241 - Interim approval of enhanced inspection and maintenance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California... Act (Pub. L. 104-59), the California SIP is approved as meeting the provisions of section 182(c)(3.... (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision...

  16. Core competencies in advanced training: what supervisors say about graduate training.

    PubMed

    Nelson, Thorana S; Graves, Todd

    2011-10-01

    In an attempt to identify needed mental health skills, many professional organizations have or are in the process of establishing core competency standards for their professions. The AAMFT identified 128 core competencies for the independent practice of MFT. The aim of this study was to learn the opinions of AAMFT Approved Supervisors as to how well prepared postgraduate trainees are when compared to the core competencies. One hundred thirty-five AAMFT Approved Supervisors provided their perspectives on (a) which competencies are most commonly learned in MFT graduate programs, (b) how well the graduates have mastered these competencies, and (c) the level to which the supervisors need the competencies to be mastered prior to entering advanced training. Results suggest that a gap exists between the level of mastery that the postgraduate trainees exhibit and the level desired by supervisors. Implications are suggested for closing this gap. © 2011 American Association for Marriage and Family Therapy.

  17. [Activities of System Studies and Simulation, Inc.

    NASA Technical Reports Server (NTRS)

    2004-01-01

    Contents include the following: 1. Launch Vehicle Interface Work Performed: a. S3 provided to KSC the new launch inclination targets needed for the April '04 launch date. 2. Prelaunch operations work performed: a. S3 updated the staffing plan for MSFC on-console personnel\\during the Final Countdown prior to launch. 3. Software Assessment Work Performed: a. S3 evaluated and recommended approval for Program Control Board (PCB) proposed change 649 for ground software changes, as well as change 650 and 650A for Stored Program Commands. 4. Education and Public Outreach Work Performed: a. S3 continues to coordinate the effort for the design and fabrication of scale models of the GP-3 for use at the launch site, education forums, and management/technical briefings. S3 also prepared a Change Request for additional funds needed for fabrication of additional scale models. S3 drafted the planned uses of these models, including the possibility of participation in the Boston, MA showings of the traveling Einstein Exhibit. 5. Program Management Support Work Performed: a. S3 prepared the input for and closed three MSFC Centerwide Action Item Tracking Systems (CAITS) actions during this period.

  18. 40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...

  19. 40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...

  20. 40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...

  1. 40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...

  2. 40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...

  3. 10 CFR 850.10 - Development and approval of the CBDPP.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DOE. (1) The responsible employer at a DOE facility must ensure that a CBDPP is prepared for the... approved or rejected by DOE earlier. (2) The responsible employer must furnish a copy of the approved CBDPP..., and affected workers or their designated representatives. (c) Update. The responsible employer must...

  4. 1 CFR 19.2 - Routing and approval of drafts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 1 General Provisions 1 2014-01-01 2012-01-01 true Routing and approval of drafts. 19.2 Section 19.2 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER PREPARATION, TRANSMITTAL, AND PROCESSING OF DOCUMENTS EXECUTIVE ORDERS AND PRESIDENTIAL PROCLAMATIONS § 19.2 Routing and approval of drafts...

  5. 1 CFR 19.2 - Routing and approval of drafts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 1 General Provisions 1 2010-01-01 2010-01-01 false Routing and approval of drafts. 19.2 Section 19.2 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER PREPARATION, TRANSMITTAL, AND PROCESSING OF DOCUMENTS EXECUTIVE ORDERS AND PRESIDENTIAL PROCLAMATIONS § 19.2 Routing and approval of drafts...

  6. 1 CFR 19.2 - Routing and approval of drafts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 1 General Provisions 1 2011-01-01 2011-01-01 false Routing and approval of drafts. 19.2 Section 19.2 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER PREPARATION, TRANSMITTAL, AND PROCESSING OF DOCUMENTS EXECUTIVE ORDERS AND PRESIDENTIAL PROCLAMATIONS § 19.2 Routing and approval of drafts...

  7. 1 CFR 19.2 - Routing and approval of drafts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 1 General Provisions 1 2012-01-01 2012-01-01 false Routing and approval of drafts. 19.2 Section 19.2 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER PREPARATION, TRANSMITTAL, AND PROCESSING OF DOCUMENTS EXECUTIVE ORDERS AND PRESIDENTIAL PROCLAMATIONS § 19.2 Routing and approval of drafts...

  8. 1 CFR 19.2 - Routing and approval of drafts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 1 General Provisions 1 2013-01-01 2012-01-01 true Routing and approval of drafts. 19.2 Section 19.2 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER PREPARATION, TRANSMITTAL, AND PROCESSING OF DOCUMENTS EXECUTIVE ORDERS AND PRESIDENTIAL PROCLAMATIONS § 19.2 Routing and approval of drafts...

  9. 76 FR 21299 - Oregon: Tentative Approval of State Underground Storage Tank Program: Public Hearing Cancellation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 281 [EPA-R10-UST-2011-0097; FRL-9296-1] Oregon: Tentative Approval of State Underground Storage Tank Program: Public Hearing Cancellation AGENCY... application for final approval of its Underground Storage Tank (UST) Program under Subtitle I of the Resource...

  10. 18 CFR 740.5 - Review and approval of State applications and programs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Review and approval of State applications and programs. 740.5 Section 740.5 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.5 Review and approval of State applications...

  11. 18 CFR 740.5 - Review and approval of State applications and programs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Review and approval of State applications and programs. 740.5 Section 740.5 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.5 Review and approval of State applications...

  12. 18 CFR 740.5 - Review and approval of State applications and programs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Review and approval of State applications and programs. 740.5 Section 740.5 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.5 Review and approval of State applications...

  13. 18 CFR 740.5 - Review and approval of State applications and programs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Review and approval of State applications and programs. 740.5 Section 740.5 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.5 Review and approval of State applications...

  14. 18 CFR 740.5 - Review and approval of State applications and programs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Review and approval of State applications and programs. 740.5 Section 740.5 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.5 Review and approval of State applications...

  15. 40 CFR 282.78 - Nevada State-Administered Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... chapter. EPA approved the Nevada program on December 24, 1992 and it was effective March 30, 1993. (b... 1976 (RCRA), as amended, 42 U.S.C. 6991 et seq. The state's program, as administered by the Nevada... application for final approval and approved by EPA on December 24, 1992. Copies may be obtained from the...

  16. 78 FR 57857 - Medicare and Medicaid Programs; Application from the Compliance Team for Initial CMS-Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ...] Medicare and Medicaid Programs; Application from the Compliance Team for Initial CMS-Approval of its Rural... Compliance Team for initial recognition as a national accrediting organization for rural health clinics (RHCs... Compliance Team's request for initial CMS approval of its RHC accreditation program. This notice also...

  17. 45 CFR 1801.31 - Approval of graduate programs by the Foundation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Graduate Study § 1801.31 Approval of... nominated for a Truman Scholarship. Factors to be used by the Foundation in considering approval include...

  18. 45 CFR 1801.31 - Approval of graduate programs by the Foundation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Graduate Study § 1801.31 Approval of... nominated for a Truman Scholarship. Factors to be used by the Foundation in considering approval include...

  19. 45 CFR 1801.31 - Approval of graduate programs by the Foundation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Graduate Study § 1801.31 Approval of... nominated for a Truman Scholarship. Factors to be used by the Foundation in considering approval include...

  20. 45 CFR 1801.31 - Approval of graduate programs by the Foundation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Graduate Study § 1801.31 Approval of... nominated for a Truman Scholarship. Factors to be used by the Foundation in considering approval include...

  1. 45 CFR 1801.31 - Approval of graduate programs by the Foundation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Graduate Study § 1801.31 Approval of... nominated for a Truman Scholarship. Factors to be used by the Foundation in considering approval include...

  2. Why Isn't There More High-fidelity Simulation Training in Diagnostic Radiology? Results of a Survey of Academic Radiologists.

    PubMed

    Cook, Tessa S; Hernandez, Jessica; Scanlon, Mary; Langlotz, Curtis; Li, Chun-Der L

    2016-07-01

    Despite its increasing use in training other medical specialties, high-fidelity simulation to prepare diagnostic radiology residents for call remains an underused educational resource. To attempt to characterize the barriers toward adoption of this technology, we conducted a survey of academic radiologists and radiology trainees. An Institutional Review Board-approved survey was distributed to the Association of University Radiologists members via e-mail. Survey results were collected electronically, tabulated, and analyzed. A total of 68 survey responses representing 51 programs were received from program directors, department chairs, chief residents, and program administrators. The most common form of educational activity for resident call preparation was lectures. Faculty supervised "baby call" was also widely reported. Actual simulated call environments were quite rare with only three programs reporting this type of educational activity. Barriers to the use of simulation include lack of faculty time, lack of faculty expertise, and lack of perceived need. High-fidelity simulation can be used to mimic the high-stress, high-stakes independent call environment that the typical radiology resident encounters during the second year of training, and can provide objective data for program directors to assess the Accreditation Council of Graduate Medical Education milestones. We predict that this technology will begin to supplement traditional diagnostic radiology teaching methods and to improve patient care and safety in the next decade. Published by Elsevier Inc.

  3. Environmental Assessment: 2005 Base Realignment and Closure Seymour Johnson Air Force Base Goldsboro, North Carolina

    DTIC Science & Technology

    2007-07-01

    clearance criteria is being prepared. Expected completion date: __ _ A temporary waiver for construction activity in the airfield vacinity was approved on...space clearance criteria is being prepared. Expected completion date: __ _ A temporary waiver for construction activity in the airfield vacinity was...construction activity in the airfield vacinity was approved on ____ (date). A permanent waiver of airfield/airspace clearance criteria was obtained on

  4. 25 CFR 1000.103 - Do Tribes/Consortia need Secretarial approval to reallocate funds between programs that the Tribe...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Do Tribes/Consortia need Secretarial approval to reallocate funds between programs that the Tribe/Consortium administers under the AFA? 1000.103 Section 1000....103 Do Tribes/Consortia need Secretarial approval to reallocate funds between programs that the Tribe...

  5. 49 CFR 381.515 - May the FMCSA remove approved participants from a pilot program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false May the FMCSA remove approved participants from a... § 381.515 May the FMCSA remove approved participants from a pilot program? The Administrator will... with the terms and conditions of the pilot program, or if continued participation is inconsistent with...

  6. 20 CFR 416.1338 - If you are participating in an appropriate program of vocational rehabilitation services...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... approved by us; providers we may approve include, but are not limited to— (A) A public or private... carried out under an individualized program or plan; (4) An individualized education program developed under policies and procedures approved by the Secretary of Education for assistance to States for the...

  7. 20 CFR 404.327 - When you are participating in an appropriate program of vocational rehabilitation services...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... services approved by us; providers we may approve include, but are not limited to— (A) A public or private... carried out under an individualized program or plan; (4) An individualized education program developed under policies and procedures approved by the Secretary of Education for assistance to States for the...

  8. 76 FR 39033 - Airworthiness Directives; Rolls-Royce Deutschland Ltd & Co KG (RRD) BR700-710 Series Turbofan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... limitation section (ALS) of their approved maintenance program (Time Limits Manual (TLM), chapters 05-00-01... airplanes used for pilot training. Revise their ALS of their approved maintenance program (TLM chapters 05... limitations section (ALS) of the operators approved maintenance program (reference the Time Limits Manual (TLM...

  9. 77 FR 15267 - Clean Air Act Full Approval of Title V Operating Permits Program; Southern Ute Indian Tribe

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-15

    ... Full Approval of Title V Operating Permits Program; Southern Ute Indian Tribe AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: The EPA is promulgating full approval of the Title V Operating Permits Program submitted by the Southern Ute Indian Tribe (Tribe). The Tribe's Title V Operating...

  10. 10 CFR 851.11 - Development and approval of worker safety and health program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... workers at multi-contractor workplaces. (3) The worker safety and health program must describe how the... may be performed at a covered workplace unless an approved worker safety and health program is in... 10 Energy 4 2010-01-01 2010-01-01 false Development and approval of worker safety and health...

  11. 45 CFR 95.611 - Prior approval conditions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-GRANT PROGRAMS (PUBLIC ASSISTANCE, MEDICAL ASSISTANCE AND STATE CHILDREN'S HEALTH INSURANCE PROGRAMS... requests for approval which affect only one approving component of HHS (CMS, OCSE, or Children's Bureau... days for major milestones. For Aid to Families with Dependent Children (AFDC) Family Assistance...

  12. 45 CFR 95.611 - Prior approval conditions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-GRANT PROGRAMS (PUBLIC ASSISTANCE, MEDICAL ASSISTANCE AND STATE CHILDREN'S HEALTH INSURANCE PROGRAMS... requests for approval which affect only one approving component of HHS (CMS, OCSE, or Children's Bureau... days for major milestones. For Aid to Families with Dependent Children (AFDC) Family Assistance...

  13. 45 CFR 95.611 - Prior approval conditions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-GRANT PROGRAMS (PUBLIC ASSISTANCE, MEDICAL ASSISTANCE AND STATE CHILDREN'S HEALTH INSURANCE PROGRAMS... requests for approval which affect only one approving component of HHS (CMS, OCSE, or Children's Bureau... days for major milestones. For Aid to Families with Dependent Children (AFDC) Family Assistance...

  14. 45 CFR 95.611 - Prior approval conditions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-GRANT PROGRAMS (PUBLIC ASSISTANCE, MEDICAL ASSISTANCE AND STATE CHILDREN'S HEALTH INSURANCE PROGRAMS... requests for approval which affect only one approving component of HHS (CMS, OCSE, or Children's Bureau... days for major milestones. For Aid to Families with Dependent Children (AFDC) Family Assistance...

  15. 25 CFR 1000.88 - Do Tribes/Consortia need Secretarial approval to redesign BIA programs that the Tribe/Consortium...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Do Tribes/Consortia need Secretarial approval to redesign BIA programs that the Tribe/Consortium administers under an AFA? 1000.88 Section 1000.88 Indians... in An Afa § 1000.88 Do Tribes/Consortia need Secretarial approval to redesign BIA programs that the...

  16. 41 CFR 300-90.5 - What factors will GSA consider in approving a request for a telework travel test program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... consider in approving a request for a telework travel test program? 300-90.5 Section 300-90.5 Public Contracts and Property Management Federal Travel Regulation System GENERAL AGENCY REQUIREMENTS 90-TELEWORK TRAVEL EXPENSES TEST PROGRAMS § 300-90.5 What factors will GSA consider in approving a request for a...

  17. University of Maryland MRSEC - For Members: Travel

    Science.gov Websites

    Educational Education Pre-College Programs Homeschool Programs Undergraduate & Graduate Programs Teacher University of Maryland requires pre-approval for all travel. Domestic travel approval requests must be

  18. 40 CFR 501.31 - Review and approval procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SLUDGE MANAGEMENT PROGRAM REGULATIONS Program Approval, Revision and Withdrawal § 501.31 Review and... sludge management program within 90 days after receiving a complete program submission. (b) Within 30... questions; and (6) Briefly outline the fundamental aspects of the State's proposed program, and the process...

  19. Electron Microscopist | Center for Cancer Research

    Cancer.gov

    PROGRAM DESCRIPTION The Cancer Research Technology Program (CRTP) develops and implements emerging technology, cancer biology expertise and research capabilities to accomplish NCI research objectives. The CRTP is an outward-facing, multi-disciplinary hub purposed to enable the external cancer research community and provides dedicated support to NCI’s intramural Center for Cancer Research (CCR). The dedicated units provide electron microscopy, protein characterization, protein expression, optical microscopy and genetics. These research efforts are an integral part of CCR at the Frederick National Laboratory for Cancer Research (FNLCR). CRTP scientists also work collaboratively with intramural NCI investigators to provide research technologies and expertise. KEY ROLES/RESPONSIBILITIES - THIS POSITION IS CONTINGENT UPON FUNDING APPROVAL The Electron Microscopist will: Operate ultramicrotomes (Leica) and other instrumentation related to the preparation of embedded samples for EM (TEM and SEM) Operate TEM microscopes, (specifically Hitachi, FEI T20 and FEI T12) as well as SEM microscopes (Hitachi); task will include loading samples, screening, and performing data collection for a variety of samples: from cells to proteins Manage maintenance for the TEM and SEM microscopes Provide technical advice to investigators on sample preparation and data collection

  20. ChemTechLinks: Alliances for Chemical Technician Education

    NASA Astrophysics Data System (ADS)

    Nameroff, Tamara

    2003-09-01

    ChemTechLinks (CTL) is a project of the American Chemical Society (ACS) Educational and International Activities Division and funded by the National Science Foundation to support and advance chemistry-based technician education. The project aims to help improve technician education programs, foster academic-industry alliances, provide professional development opportunities for faculty, and increase student recruitment into chemical technology. The CTL Web site serves as an information clearinghouse and link to other ACS resources and programs, including a Web-based, Voluntary Industry Standards (VIS) database, the Chemistry Technician Program Approval Service, the College Chemistry Consultants Service, summer workshops for high school teachers and two-year college faculty that emphasize a technology-oriented curriculum, scholarships for two-year college faculty to attend ACS Short Courses, a self-study instructional guide for faculty to use in preparing for classroom instruction, and information and free recruitment materials about career opportunities in chemistry technology.

  1. EC97-44354-1

    NASA Image and Video Library

    1997-12-16

    The F-16XL #1 (NASA 849) takes off for the first flight of the Digital Flight Control System (DFCS) on December 16, 1997. Like most first flight, the DFCS required months of preparations. During July 1997, crews worked on the engine, cockpit, canopy, seat, and instrumentation. By late August, the aircraft began combined systems tests and a flight readiness review. Although the Air Force Safety Review Board (AFSRB)- a group that provided double checks on all flight operations - approved the program in late November 1997, a problem with the aircraft flight computer delayed the functional check flight until mid-December.

  2. 24 CFR 583.405 - Program changes.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Program changes. 583.405 Section... DEVELOPMENT COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM Administration § 583.405 Program changes. (a) HUD approval. (1) A recipient may not make any significant changes to an approved program without prior HUD...

  3. 31 CFR 8.33 - Accuracy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... public accountant, and enrolled practitioner shall exercise due diligence in: (a) Preparing or assisting in the preparation of, approving, and filing returns, documents, affidavits, and other papers...

  4. 31 CFR 8.33 - Accuracy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... public accountant, and enrolled practitioner shall exercise due diligence in: (a) Preparing or assisting in the preparation of, approving, and filing returns, documents, affidavits, and other papers...

  5. 31 CFR 8.33 - Accuracy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... public accountant, and enrolled practitioner shall exercise due diligence in: (a) Preparing or assisting in the preparation of, approving, and filing returns, documents, affidavits, and other papers...

  6. 31 CFR 8.33 - Accuracy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... public accountant, and enrolled practitioner shall exercise due diligence in: (a) Preparing or assisting in the preparation of, approving, and filing returns, documents, affidavits, and other papers...

  7. 31 CFR 8.33 - Accuracy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... public accountant, and enrolled practitioner shall exercise due diligence in: (a) Preparing or assisting in the preparation of, approving, and filing returns, documents, affidavits, and other papers...

  8. 78 FR 17282 - Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ... of Application for Approval of Discontinuance or Modification of a Railroad Signal System In... approval from the Federal Railroad Administration (FRA) for the discontinuance or modification of a signal... modifications that it will make to the signal system at the A&R crossing in preparation for the installation of...

  9. 27 CFR 70.416 - Application for approval of interlocking directors and officers under section 8 of the Federal...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the appropriate TTB officer. Applications for such permission to take office must be prepared and... 27 Alcohol, Tobacco Products and Firearms 2 2010-04-01 2010-04-01 false Application for approval... Beer § 70.416 Application for approval of interlocking directors and officers under section 8 of the...

  10. 76 FR 52658 - State Program Requirements; Approval of Application for Program Revision to the National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... (ADEC) in four phases. Phases I-III have been transferred from the EPA to ADEC. In March 2011, ADEC made a submission for approval for a one year extension of the transfer of Phase IV of the APDES program... facilities not previously transferred in Phases I-III. The EPA approved the one year extension for Phase IV...

  11. 76 FR 48563 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-January Through March 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ...-7205 Ventricular Assist Device (Destination Therapy) Facilities. XIII Medicare-Approved Lung JoAnna...-Approved Ventricular Assist Device (Destination Therapy) Facilities, Addendum XIII: Lung Volume Reduction...-Approved Ventricular Assist Device (Destination Therapy) Facilities (January Through March 2011) Addendum...

  12. 33 CFR 332.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... guides modification of those projects to optimize performance. It includes the selection of appropriate... approved in-lieu fee program that are available for sale prior to being fulfilled in accordance with an approved mitigation project plan. Advance credit sales require an approved in-lieu fee program instrument...

  13. 76 FR 29747 - State Program Requirements; Proposal To Approve Maine's Base National Pollutant Discharge...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ...'s Base National Pollutant Discharge Elimination System (NPDES) Permitting Program AGENCY... of Maine's Base NPDES Permitting Program in these territories as part of the administrative record to... Maine's base program as EPA approved it in 2001. Thus, the state's program would not include regulation...

  14. 40 CFR 282.83 - North Carolina State-Administered Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (Insofar as .94A(2) subjects certain heating oil tanks and the piping connected to otherwise excluded tanks... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.83 North... an underground storage tank program in lieu of the Federal program under subtitle I of the Resource...

  15. 50 CFR 15.21 - General application procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.21 General... purposes only: Scientific research; zoological breeding or display programs; cooperative breeding programs...) A person wishing to obtain a permit under this subpart or approval of cooperative breeding programs...

  16. 50 CFR 15.21 - General application procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.21 General... purposes only: Scientific research; zoological breeding or display programs; cooperative breeding programs...) A person wishing to obtain a permit under this subpart or approval of cooperative breeding programs...

  17. 42 CFR 413.75 - Direct GME payments: General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-based providers for the costs of approved residency programs in medicine, osteopathy, dentistry, and... participates in an approved medical residency program, including programs in osteopathy, dentistry, and... programs in osteopathy, dentistry, and podiatry, as required in order to become certified by the...

  18. 7 CFR 1700.55 - Telecommunications Program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Telecommunications Program. 1700.55 Section 1700.55... AGRICULTURE GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.55 Telecommunications Program. (a..., Telecommunications Program, has the authority to approve the following loans, loan guarantees, and lien...

  19. 7 CFR 1700.55 - Telecommunications Program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Telecommunications Program. 1700.55 Section 1700.55... AGRICULTURE GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.55 Telecommunications Program. (a..., Telecommunications Program, has the authority to approve the following loans, loan guarantees, and lien...

  20. 7 CFR 1700.55 - Telecommunications Program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Telecommunications Program. 1700.55 Section 1700.55... AGRICULTURE GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.55 Telecommunications Program. (a..., Telecommunications Program, has the authority to approve the following loans, loan guarantees, and lien...

  1. 7 CFR 1700.55 - Telecommunications Program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Telecommunications Program. 1700.55 Section 1700.55... AGRICULTURE GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.55 Telecommunications Program. (a..., Telecommunications Program, has the authority to approve the following loans, loan guarantees, and lien...

  2. 7 CFR 1700.55 - Telecommunications Program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Telecommunications Program. 1700.55 Section 1700.55... AGRICULTURE GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.55 Telecommunications Program. (a..., Telecommunications Program, has the authority to approve the following loans, loan guarantees, and lien...

  3. Nuclear education and training: marriages that work

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanson, H.D.

    1985-11-01

    Public Service Electric and Gas Company is meeting the education and training needs of its nuclear department operations, support, and services personnel through a variety of activities in association with institutions of higher education. Activities include credit or credit recommendation programs at the associates, undergraduate, and graduate degree level. The paper emphasizes the process of working with a local college in the development of a new degree program for submission through the State Board of Education. The development, review, evaluation, and approval process is detailed as well as lessons learned. Plans for further development of the program toward ABET accreditationmore » are also described. Samples of the surveys conducted to determine employee interest in terms of academic area, academic level, offering strategies, etc. are presented. The process of soliciting program proposals from universities and colleges, the selection process, and implementation of the programs are also discussed. More briefly described is the preparation for credit recommendation process from regionally accredited groups. External degree programs, off-hours course presentations on-site for undergraduate and graduate credit, faculty extern, student intern, and co-op activities are also discussed.« less

  4. CROMERR Compliance for the Publicly Owned Treatment Works Pretreatment Program

    EPA Pesticide Factsheets

    Memorandum to Pretreatment Authorities who are CROMERR applicants about obligations to follow National Pretreatment Program requirements and CROMERR procedures when applying for, approving and incorporating CROMERR practices into an approved POTW program.

  5. 24 CFR 214.100 - General.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES HOUSING COUNSELING PROGRAM Approval and Disapproval of Housing Counseling Agencies § 214.100 General. An organization may be approved by HUD as a HUD-approved housing counseling agency upon meeting the requirements of § 214.103 and...

  6. 24 CFR 214.100 - General.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES HOUSING COUNSELING PROGRAM Approval and Disapproval of Housing Counseling Agencies § 214.100 General. An organization may be approved by HUD as a HUD-approved housing counseling agency upon meeting the requirements of § 214.103 and...

  7. 24 CFR 214.100 - General.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES HOUSING COUNSELING PROGRAM Approval and Disapproval of Housing Counseling Agencies § 214.100 General. An organization may be approved by HUD as a HUD-approved housing counseling agency upon meeting the requirements of § 214.103 and...

  8. 24 CFR 214.100 - General.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES HOUSING COUNSELING PROGRAM Approval and Disapproval of Housing Counseling Agencies § 214.100 General. An organization may be approved by HUD as a HUD-approved housing counseling agency upon meeting the requirements of § 214.103 and...

  9. 24 CFR 214.100 - General.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES HOUSING COUNSELING PROGRAM Approval and Disapproval of Housing Counseling Agencies § 214.100 General. An organization may be approved by HUD as a HUD-approved housing counseling agency upon meeting the requirements of § 214.103 and...

  10. WIPP Remote-Handled TRU Waste Program Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Most, W.; Kehrman, B.

    2006-07-01

    There are two major regulatory approval milestones necessary in order to commence disposal operations for remote-handled transuranic (RH TRU) waste at the Waste Isolation Pilot Plant (WIPP)-the RH TRU hazardous waste permit modification request [1] and the radiological characterization plan [2]. One of those milestones has been achieved. The US Environmental Protection Agency (EPA) issued its final decision to approve the Department of Energy's (DOE) RH TRU radiological characterization plan along with the RH TRU Waste Characterization Program Implementation Plan [3], on March 26, 2004. The RH TRU hazardous waste permit modification request still awaits agency approval. In EPA's decisionmore » to approve the DOE's RH TRU radiological characterization plan, the EPA also set forth the process for approving site-specific RH TRU waste characterization programs. Included in the March 29, 2005, RH TRU second Notice of Deficiency [4] (NOD) on the Class 3 Permit Modification Request for RH TRU Waste, the New Mexico Environment Department (NMED) requested that the Permittees combine their responses for the RH TRU Waste NOD with the Section 311 permit modification request NOD. The Combined Response Document was submitted April 28, 2005 [5]. Another NOD [6] was issued by the NMED on September 1, 2005, to clarify the Permittees' proposal and submit these clarifications to the administrative record. Combining both the chap. 311 [7] and RH TRU waste permit modification requests allows for both the regulator and Permittees to expedite action on the modification requests. The Combined Response Document preserves human resources and costs by having only one administrative process for both modification requests. Facility readiness requirements of the RH TRU waste final permit [8] must be implemented to declare that the WIPP is ready to receive RH TRU waste for storage and disposal. To demonstrate readiness, the WIPP is preparing for an Operational Readiness Review (ORR) of the RH TRU waste management equipment, system, and procedures. Required by DOE Order, the ORR demonstrates the capability of managing RH TRU waste. The Management and Operating Contractor (MOC) for the WIPP must first perform a Line Management Assessment. Upon successful completion of the Line Management Assessment, the MOC performs the Contractor ORR and presents the results to the local DOE office. At that time, the local DOE office performs its own ORR to declare readiness to DOE Headquarters. (authors)« less

  11. 24 CFR 582.405 - Program changes.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Program changes. 582.405 Section... DEVELOPMENT COMMUNITY FACILITIES SHELTER PLUS CARE Administration § 582.405 Program changes. (a) Changes. HUD must approve, in writing, any significant changes to an approved program. Significant changes that...

  12. The possibility of obtaining marketing authorization of orphan pharmaceutical compounding preparations: 3,4-DAP for Lambert-Eaton Myasthenic Syndrome.

    PubMed

    de Wilde, Sofieke; de Jong, Maria G H; Lipka, Alexander F; Guchelaar, Henk-Jan; Schimmel, Kirsten J M

    2018-03-01

    Pharmaceutical compounding preparations, produced by (hospital) pharmacies, usually do not have marketing authorization. As a consequence, some of these pharmaceutical compounding preparations can be picked-up by a pharmaceutical company to obtain marketing authorization, often leading to price increases. An example is the 3,4-diaminopyridine slow release (3,4-DAP SR) tablets for Lambert-Eaton Myasthenic Syndrome (LEMS). In 2009 marketing authorization was given for the commercial immediate release phosphate salt of the drug, including a fifty-fold price increase compared to the pharmaceutical compounding preparation. Obtaining marketing authorization for 3,4-DAP SR by academia might have been a solution to prevent this price increase. To determine whether the available data of a pharmaceutical compounding preparation with long-term experience in regular care are adequate to obtain marketing authorization, 3,4-DAP SR is used as a case study. A retrospective qualitative case-study was performed. Initially, document analysis was executed by collecting the required data for marketing authorization in general and whether data of Firdapse® and 3,4-DAP SR met these requirements. Secondly, the (non-) available data of the two formulations were compared with each other to determine the differences in availability. At the time of approval, almost all data were available for both Firdapse® and 3,4-DAP SR. Conversely, much of the data used for the approval of Firdapse® originated from the 3,4-DAP immediate release (3,4-DAP IR) formulation. Only two bioequivalence studies and one pharmacology safety study was performed with Firdapse® before marketing authorization application. In conclusion, at time Firdapse® obtained approval, the data available did not differ substantially from 3,4-DAP SR, indicating that approval with 3,4-DAP SR would have been possible. We make a plea for approval of orphan medicinal products developed and manufactured by academic institutions as to keep utilization of these products affordable. Copyright © 2017 Elsevier B.V. All rights reserved.

  13. 49 CFR 452.7 - Continuous examination program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS EXAMINATION OF CONTAINERS § 452.7 Continuous examination program. (a) In lieu of a periodic examination under § 452.1, each owner of an approved container meeting § 450.5 may examine the container or have it examined using an approved continuous examination...

  14. 49 CFR 452.7 - Continuous examination program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS EXAMINATION OF CONTAINERS § 452.7 Continuous examination program. (a) In lieu of a periodic examination under § 452.1, each owner of an approved container meeting § 450.5 may examine the container or have it examined using an approved continuous examination...

  15. 49 CFR 452.7 - Continuous examination program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS EXAMINATION OF CONTAINERS § 452.7 Continuous examination program. (a) In lieu of a periodic examination under § 452.1, each owner of an approved container meeting § 450.5 may examine the container or have it examined using an approved continuous examination...

  16. 49 CFR 452.7 - Continuous examination program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS EXAMINATION OF CONTAINERS § 452.7 Continuous examination program. (a) In lieu of a periodic examination under § 452.1, each owner of an approved container meeting § 450.5 may examine the container or have it examined using an approved continuous examination...

  17. 49 CFR 452.7 - Continuous examination program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS EXAMINATION OF CONTAINERS § 452.7 Continuous examination program. (a) In lieu of a periodic examination under § 452.1, each owner of an approved container meeting § 450.5 may examine the container or have it examined using an approved continuous examination...

  18. 7 CFR 1700.54 - Electric Program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Electric Program. 1700.54 Section 1700.54 Agriculture... GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.54 Electric Program. (a) Administrator: The... Administrator, Electric Program, has the authority to approve the following loans, loan guarantees, and lien...

  19. 7 CFR 1700.54 - Electric Program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Electric Program. 1700.54 Section 1700.54 Agriculture... GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.54 Electric Program. (a) Administrator: The... Administrator, Electric Program, has the authority to approve the following loans, loan guarantees, and lien...

  20. 7 CFR 1700.54 - Electric Program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Electric Program. 1700.54 Section 1700.54 Agriculture... GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.54 Electric Program. (a) Administrator: The... Administrator, Electric Program, has the authority to approve the following loans, loan guarantees, and lien...

  1. 40 CFR 272.2501 - Wisconsin State-administered program; final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Wisconsin § 272.2501... cited in this paragraph are incorporated by reference as part of the hazardous waste management program... Applicable to the Hazardous Waste Management Program, (dated August 9, 1993). (2) EPA Approved Wisconsin...

  2. Section 609 Technician Training and Certification Programs

    EPA Pesticide Factsheets

    EPA-approved programs for technicians who service motor vehicle air conditioning (MVAC) systems. Any person who repairs or services a MVAC system for consideration must be certified under section 609 of the Clean Air Act by an EPA-approved program.

  3. 49 CFR 240.103 - Approval of design of individual railroad programs by FRA.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Approval of design of individual railroad programs... (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION QUALIFICATION AND CERTIFICATION OF... individual railroad programs by FRA. (a) Each railroad shall submit its written certification program and a...

  4. 75 FR 28673 - Notice of Request for Extension of a Currently Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... approved information collection: 49 U.S.C. Sections 5310 and 5311--Capital Assistance Program for Elderly... Assistance Program for Elderly Persons and Persons with Disabilities and Nonurbanized Area Formula Program (OMB Number: 2132-0561) Background: The Capital Assistance Program for Elderly Persons and Persons with...

  5. 40 CFR 272.151 - Arizona State-administered program: Final authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...

  6. 40 CFR 272.151 - Arizona State-administered program: Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...

  7. 40 CFR 272.151 - Arizona State-administered program: Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...

  8. 40 CFR 272.751 - Indiana state-administered program: Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Indiana § 272.751... the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. This... Applicable to the Hazardous Waste Management Program, dated March 2001. (ii) The EPA approved Indiana...

  9. 40 CFR 272.751 - Indiana state-administered program: Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Indiana § 272.751... the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. This... Applicable to the Hazardous Waste Management Program, dated March 2001. (ii) The EPA approved Indiana...

  10. 40 CFR 272.501 - Florida State-administered program: Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...

  11. 40 CFR 272.151 - Arizona State-administered program: Final authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...

  12. 40 CFR 272.501 - Florida State-administered program: Final authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...

  13. 40 CFR 272.501 - Florida State-administered program: Final authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...

  14. 40 CFR 272.751 - Indiana state-administered program: Final authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Indiana § 272.751... the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. This... Applicable to the Hazardous Waste Management Program, dated March 2001. (ii) The EPA approved Indiana...

  15. 40 CFR 272.501 - Florida State-administered program: Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...

  16. 40 CFR 272.501 - Florida State-administered program: Final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...

  17. 40 CFR 272.151 - Arizona State-administered program: Final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...

  18. Use of Data to Develop a Code Blue Training Program

    DTIC Science & Technology

    2017-01-28

    MDW/SGVU SUBJECT: Professional Presentation Approval 7 FEB 2016 1. Your paper, entitled Use of Data to Develop a Code Blue Training Program...3039 must be submitted for review and approval.) 6. TITLE OF MATERIAL TO BE PUBLISHED OR PRESENTED: Use of Data to Develop a Code Blue Training ...January 19, 2017 D N/A 29. COMMENTS ~ APPROVED 0 DISAPPROVED Approved training presentation with appropriate disclaimers based on training curriculum

  19. 76 FR 12926 - Clean Air Act Proposed Interim Approval of Title V Operating Permits Program; Southern Ute Indian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... Proposed Interim Approval of Title V Operating Permits Program; Southern Ute Indian Tribe AGENCY... Title V Operating Permits Program submitted by the Southern Ute Indian Tribe (Tribe). The Tribe's Title V Operating Permit Program (Title V Program) was submitted for the purpose of administering a tribal...

  20. Moving granular-bed filter development program, Option III: Development of moving granular-bed filter technology for multi-contaminant control. Task 14: Test plan; Topical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haas, J.C.; Olivo, C.A.; Wilson, K.B.

    1994-04-01

    An experimental test plan has been prepared for DOE/METC review and approval to develop a filter media suitable for multi-contaminant control in granular-bed filter (GBF) applications. The plan includes identification, development, and demonstration of methods for enhanced media morphology, chemical reactivity, and mechanical strength. The test plan includes media preparation methods, physical and chemical characterization methods for fresh and reacted media, media evaluation criteria, details of test and analytical equipment, and test matrix of the proposed media testing. A filter media composed of agglomerated limestone and clay was determined to be the best candidate for multi-contaminate control in GBF operation.more » The combined limestone/clay agglomerate has the potential to remove sulfur and alkali species, in addition to particulate, and possibly halogens and trace heavy metals from coal process streams.« less

  1. 7 CFR 996.22 - USDA-approved laboratory.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS FOR DOMESTIC AND IMPORTED PEANUTS MARKETED IN THE UNITED STATES Definitions § 996.22 USDA-approved laboratory. USDA-approved laboratory means laboratories approved by the Science and Technology Programs...

  2. 77 FR 52233 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ...: EPA is approving revisions to the Puerto Rico Regulations for the Control of Atmospheric Pollution, submitted to EPA by the Puerto Rico Environmental Quality Board on July 13, 2011. This action approves... of Puerto Rico's Title V Operating Program. Generally the revisions to the regulations involve...

  3. 77 FR 31499 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-29

    ..., published on March 22, 2012, that approved revisions to the Puerto Rico Regulations for the Control of Atmospheric Pollution. Those revisions were submitted to EPA by the Puerto Rico Environmental Quality Board on...] Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of Puerto...

  4. 9 CFR 327.6 - Products for importation; program inspection, time and place; application for approval of...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... inspection, time and place; application for approval of facilities as official import inspection... § 327.6 Products for importation; program inspection, time and place; application for approval of..., wholesome, and otherwise not adulterated at the time the products are offered for importation into the...

  5. 9 CFR 327.6 - Products for importation; program inspection, time and place; application for approval of...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... inspection, time and place; application for approval of facilities as official import inspection... § 327.6 Products for importation; program inspection, time and place; application for approval of..., wholesome, and otherwise not adulterated at the time the products are offered for importation into the...

  6. 9 CFR 327.6 - Products for importation; program inspection, time and place; application for approval of...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... inspection, time and place; application for approval of facilities as official import inspection... § 327.6 Products for importation; program inspection, time and place; application for approval of..., wholesome, and otherwise not adulterated at the time the products are offered for importation into the...

  7. 9 CFR 327.6 - Products for importation; program inspection, time and place; application for approval of...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... inspection, time and place; application for approval of facilities as official import inspection... § 327.6 Products for importation; program inspection, time and place; application for approval of..., wholesome, and otherwise not adulterated at the time the products are offered for importation into the...

  8. 75 FR 58789 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-April Through June 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ...- approved carotid stent facilities. Included in this notice is a list of the American College of Cardiology... 21244-1850, or you can call (410) 786-6962. Questions concerning Medicare-approved carotid stent... listings of Medicare-approved carotid stent facilities. All facilities listed meet CMS standards for...

  9. 75 FR 79173 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-July Through September 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... collections of information in CMS regulations and a list of Medicare- approved carotid stent facilities.... Questions concerning Medicare-approved carotid stent facilities in Addendum VIII may be addressed to Sarah J... 20 of the CFR. Addendum VIII includes listings of Medicare-approved carotid stent facilities. All...

  10. 30 CFR 250.904 - What is the Platform Approval Program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... these requirements will satisfy MMS criteria for approval of fixed platforms of a proven design that... approval for a floating platform; a platform of unique design; or a platform being installed in deepwater (> 400 ft.) or a frontier area, you must also meet the requirements of the Platform Verification Program...

  11. 77 FR 59616 - Medicare and Medicaid Programs; Approval of the American Osteopathic Association/Healthcare...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Medicare & Medicaid Services [CMS-3264-FN... Accreditation Program (AOA/HFAP) Application for Continuing CMS-Approval of Its Ambulatory Surgical Center (ASC... 6 years or sooner as determined by CMS. AOA/HFAP's current term of approval for their ASC...

  12. 77 FR 59879 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; PBR and PTIO

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ... its air pollution permit program more efficient. Approving these additions will make the Permits by... revisions will make Ohio's air permit program more efficient while continuing to protect human health and...-9714-6] Approval and Promulgation of Air Quality Implementation Plans; Ohio; PBR and PTIO AGENCY...

  13. 2014 Fermilab Laboratory Directoed Research & Development Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    W. Wester

    After initiation by the Fermilab Laboratory Director, a team from the senior Laboratory leadership and a Laboratory Directed Research and Development (LDRD) Advisory Committee developed an implementation plan for LDRD at Fermilab for the first time. This implementation was captured in the approved Fermilab 2014 LDRD Program Plan and followed directions and guidance from the Department of Energy (DOE) order, DOE O 413.2B, a “Roles, Responsibilities, and Guidelines, …” document, and examples of best practices at other DOE Office of Science Laboratories. At Fermilab, a FY14 midyear Call for Proposals was issued. A LDRD Selection Committee evaluated those proposals thatmore » were received and provided a recommendation to the Laboratory Director who approved seven LDRD projects. This Annual Report focuses on the status of those seven projects and provides an overview of the current status of LDRD at Fermilab. The seven FY14 LDRD approved projects had a date of initiation late in FY14 such that this report reflects approximately six months of effort approximately through January 2015. The progress of these seven projects, the subsequent award of six additional new projects beginning in FY15, and preparations for the issuance of the FY16 Call for Proposals indicates that LDRD is now integrated into the overall annual program at Fermilab. All indications are that LDRD is improving the scientific and technical vitality of the Laboratory and providing new, novel, or cutting edge projects carried out at the forefront of science and technology and aligned with the mission and strategic visions of Fermilab and the Department of Energy.« less

  14. 15 CFR 923.80 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Amendments to and Termination of Approved Management Programs § 923... coastal state may amend or modify a management program which it has submitted and which has been approved...

  15. 15 CFR 923.80 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Amendments to and Termination of Approved Management Programs § 923... coastal state may amend or modify a management program which it has submitted and which has been approved...

  16. 42 CFR 415.152 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subpart— Approved graduate medical education (GME) program means one of the following: (1) A residency program approved by the Accreditation Council for Graduate Medical Education, by the American Osteopathic... on Podiatric Medical Education of the American Podiatric Medical Association. (2) A program otherwise...

  17. 76 FR 38220 - Submission for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... OVERSEAS PRIVATE INVESTMENT CORPORATION Submission for OMB Review AGENCY: Overseas Private... notifying the public that the agency has prepared an information collection for OMB review and approval... Form Under Review Type of Request: Extension, without change, of a currently approved collection. Title...

  18. 42 CFR 488.61 - Special procedures for approval and re-approval of organ transplant centers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Approval. Centers that have lost their Medicare approval may seek re-entry into the Medicare program at any... 42 Public Health 5 2012-10-01 2012-10-01 false Special procedures for approval and re-approval of... ENFORCEMENT PROCEDURES Special Requirements § 488.61 Special procedures for approval and re-approval of organ...

  19. 42 CFR 488.61 - Special procedures for approval and re-approval of organ transplant centers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Approval. Centers that have lost their Medicare approval may seek re-entry into the Medicare program at any... 42 Public Health 5 2011-10-01 2011-10-01 false Special procedures for approval and re-approval of... ENFORCEMENT PROCEDURES Special Requirements § 488.61 Special procedures for approval and re-approval of organ...

  20. 42 CFR 488.61 - Special procedures for approval and re-approval of organ transplant centers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Approval. Centers that have lost their Medicare approval may seek re-entry into the Medicare program at any... 42 Public Health 5 2013-10-01 2013-10-01 false Special procedures for approval and re-approval of... ENFORCEMENT PROCEDURES Special Requirements § 488.61 Special procedures for approval and re-approval of organ...

  1. 42 CFR 488.61 - Special procedures for approval and re-approval of organ transplant centers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Approval. Centers that have lost their Medicare approval may seek re-entry into the Medicare program at any... 42 Public Health 5 2010-10-01 2010-10-01 false Special procedures for approval and re-approval of... ENFORCEMENT PROCEDURES Special Requirements § 488.61 Special procedures for approval and re-approval of organ...

  2. 78 FR 65030 - Agency Requests for Renewal of a Previously Approved Information Collection(s): Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-30

    ... Previously Approved Information Collection(s): Approval of Underwriters of Marine Hull Insurance AGENCY...: Approval of Underwriters of Marine Hull Insurance. Form Numbers: None. Type of Review: Renewal of an... approval of marine hull underwriters to insure Maritime Administration program vessels. Foreign and...

  3. 30 CFR 746.14 - Approval, disapproval or conditional approval, of mining plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., of mining plan. 746.14 Section 746.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM REVIEW AND APPROVAL OF MINING PLANS § 746.14 Approval, disapproval or conditional approval, of mining plan. The Secretary shall approve, disapprove or...

  4. Petitioning process for irradiated foods and animal feeds in North America

    NASA Astrophysics Data System (ADS)

    Marcotte, Michelle; Kunstadt, Peter

    1993-07-01

    The lack of sufficient regulatory approvals continues to delay the commercial application of food irradiation in several countries. Often, the regulatory approval process itself appears too challenging and approvals are not even requested. We believe that petitions can be successful and want to encourage interested parties to submit good quality approval petitions to the regulatory authorities. The objective of this paper is to review petition requirements so that researchers and companies in other countries will be able to prepare petitions requesting approval for the import and sale of irradiated foods into North America.

  5. The Tropical Disease Priority Review Voucher: A Game-Changer for Tropical Disease Products.

    PubMed

    Berman, Jonathan; Radhakrishna, Tanya

    2017-01-11

    The Neglected Tropical Disease Voucher Program is a Congressionally-mandated program intended to promote approval of products for tropical diseases because it provides spectacular financial compensation consequent to FDA approval of a priority product. Three drug approvals-artemether/lumifantrine for malaria, bedaquiline for multidrug resistant tuberculosis, miltefosine for leishmaniasis-have received Tropical Disease Vouchers to date. We give our view of the type of products that might qualify for a Tropical Disease Voucher, financial considerations in venturing capital to support product development, clinical ramifications of a successful product approval, and an overall evaluation of the Program. © The American Society of Tropical Medicine and Hygiene.

  6. Civilian Radioactive Waste Management System Requirements Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C.A. Kouts

    2006-05-10

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.« less

  7. The state of general surgery training: a different perspective.

    PubMed

    Foley, P J; Roses, R E; Kelz, R R; Resnick, A S; Williams, N N; Mullen, J L; Kaiser, L R; Morris, Jon B

    2008-01-01

    Much has been written about the influences of Accreditation Council for Graduate Medical Education (ACGME) work restrictions, the litigious climate in American medicine, and the proliferation of subspecialty fellowships on general surgery training. Few previous studies have addressed general surgical residents' perceptions of surgical training on a national level. A 38-question Institutional Review Board-approved survey was sent via e-mail to the program directors at all ACGME-approved general surgical training programs for distribution to categorical general surgery residents. Voluntary responses to statements focusing on job satisfaction, quality of life, and the influences of operative experience, work hours, fellows, physician extenders, as well as faculty and administration on resident training were solicited. Overall, 997 responses were received from residents of all clinical levels from 40 states. Most respondents were from university-based programs (79%) with a broad representation of program sizes (mean of 6 graduates per year; range 2 to 11). Residents believe that they will be prepared to enter clinical practice at the conclusion of their training (86%), that the duration of surgical training is adequate (85%), and that they are exposed to sufficient case volume and complexity (85% and 84%, respectively). Only 360 respondents (36%) believe that they are financially compensated appropriately. Although most respondents support the ACGME work-hour restrictions (70%), far fewer feel that they improve their training or patient care (46.6% and 46.8%, respectively). Most respondents are proud to be surgical residents (88%), view surgery as a rewarding profession (87%), and would choose surgery as a profession again (77%). Surgical residents are positive regarding the quality of their training and life, although they feel poorly compensated for their work. Most residents intend to pursue fellowship training. Survey responses were consistent irrespective of gender, ethnicity, and program type.

  8. 78 FR 9807 - Utah Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 944... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We are approving an amendment to the Utah regulatory program (the ``Utah program'') under the Surface Mining...

  9. Alternative Renewable Biomass Tracking Program Document under the Renewable Fuel Standard Program

    EPA Pesticide Factsheets

    The approval letters that EPA approves a company's biomass tracking program meeting all the requirements outlined in 40 CFR part 80.1454, including elements determined necessary to achieve the level of quality assurance required under the regulation list.

  10. 40 CFR 82.160 - Approved equipment testing organizations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Recycling and Emissions Reduction § 82.160 Approved.... The application shall be mailed to: Section 608 Recycling Program Manager; Global Programs Division... verifying the performance of certified recycling and recovery equipment manufactured over the long term...

  11. 40 CFR 82.160 - Approved equipment testing organizations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Recycling and Emissions Reduction § 82.160 Approved.... The application shall be mailed to: Section 608 Recycling Program Manager; Global Programs Division... verifying the performance of certified recycling and recovery equipment manufactured over the long term...

  12. 40 CFR 82.160 - Approved equipment testing organizations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Recycling and Emissions Reduction § 82.160 Approved.... The application shall be mailed to: Section 608 Recycling Program Manager; Global Programs Division... verifying the performance of certified recycling and recovery equipment manufactured over the long term...

  13. 40 CFR 82.160 - Approved equipment testing organizations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Recycling and Emissions Reduction § 82.160 Approved.... The application shall be mailed to: Section 608 Recycling Program Manager; Global Programs Division... verifying the performance of certified recycling and recovery equipment manufactured over the long term...

  14. 40 CFR 82.160 - Approved equipment testing organizations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Recycling and Emissions Reduction § 82.160 Approved.... The application shall be mailed to: Section 608 Recycling Program Manager; Global Programs Division... verifying the performance of certified recycling and recovery equipment manufactured over the long term...

  15. 38 CFR 21.4236 - Tutorial assistance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) VOCATIONAL REHABILITATION AND EDUCATION Administration of Educational Assistance Programs Programs of... educational program on a half-time or more basis at an educational institution, and (2) Has a deficiency in a...) Approval. The Department of Veterans Affairs will grant approval when: (1) The educational institution...

  16. 38 CFR 21.4236 - Tutorial assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) VOCATIONAL REHABILITATION AND EDUCATION Administration of Educational Assistance Programs Programs of... educational program on a half-time or more basis at an educational institution, and (2) Has a deficiency in a...) Approval. The Department of Veterans Affairs will grant approval when: (1) The educational institution...

  17. 27 CFR 17.181 - Exportation of medicinal preparations and flavoring extracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Exportation of medicinal... USED IN MANUFACTURING NONBEVERAGE PRODUCTS Miscellaneous Provisions § 17.181 Exportation of medicinal preparations and flavoring extracts. Medicinal preparations and flavoring extracts, approved for drawback under...

  18. Spitzer Space Telescope proposal process

    NASA Astrophysics Data System (ADS)

    Laine, S.; Silbermann, N. A.; Rebull, L. M.; Storrie-Lombardi, L. J.

    2006-06-01

    This paper discusses the Spitzer Space Telescope General Observer proposal process. Proposals, consisting of the scientific justification, basic contact information for the observer, and observation requests, are submitted electronically using a client-server Java package called Spot. The Spitzer Science Center (SSC) uses a one-phase proposal submission process, meaning that fully-planned observations are submitted for most proposals at the time of submission, not months after acceptance. Ample documentation and tools are available to the observers on SSC web pages to support the preparation of proposals, including an email-based Helpdesk. Upon submission proposals are immediately ingested into a database which can be queried at the SSC for program information, statistics, etc. at any time. Large proposals are checked for technical feasibility and all proposals are checked against duplicates of already approved observations. Output from these tasks is made available to the Time Allocation Committee (TAC) members. At the review meeting, web-based software is used to record reviewer comments and keep track of the voted scores. After the meeting, another Java-based web tool, Griffin, is used to track the approved programs as they go through technical reviews, duplication checks and minor modifications before the observations are released for scheduling. In addition to detailing the proposal process, lessons learned from the first two General Observer proposal calls are discussed.

  19. 7 CFR 1425.4 - Approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS COOPERATIVE MARKETING ASSOCIATIONS § 1425.4 Approval. (a) For a cooperative to gain CMA status to participate in a marketing assistance loan or Loan deficiency... prepared in accordance with generally accepted accounting principles; (3) A copy of the articles of...

  20. 42 CFR 483.151 - State review and approval of nurse aide training and competency evaluation programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false State review and approval of nurse aide training... Agencies: Nurse Aide Training and Competency Evaluation, and Paid Feeding Assistants § 483.151 State review and approval of nurse aide training and competency evaluation programs. (a) State review and...

  1. 42 CFR 483.152 - Requirements for approval of a nurse aide training and competency evaluation program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Requirements for approval of a nurse aide training... Agencies: Nurse Aide Training and Competency Evaluation, and Paid Feeding Assistants § 483.152 Requirements for approval of a nurse aide training and competency evaluation program. (a) For a nurse aide training...

  2. 42 CFR 483.151 - State review and approval of nurse aide training and competency evaluation programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Agencies: Nurse Aide Training and Competency Evaluation, and Paid Feeding Assistants § 483.151 State review and approval of nurse aide training and competency evaluation programs. (a) State review and... 42 Public Health 5 2012-10-01 2012-10-01 false State review and approval of nurse aide training...

  3. 42 CFR 483.151 - State review and approval of nurse aide training and competency evaluation programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Agencies: Nurse Aide Training and Competency Evaluation, and Paid Feeding Assistants § 483.151 State review and approval of nurse aide training and competency evaluation programs. (a) State review and... 42 Public Health 5 2011-10-01 2011-10-01 false State review and approval of nurse aide training...

  4. 42 CFR 483.151 - State review and approval of nurse aide training and competency evaluation programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Agencies: Nurse Aide Training and Competency Evaluation, and Paid Feeding Assistants § 483.151 State review and approval of nurse aide training and competency evaluation programs. (a) State review and... 42 Public Health 5 2014-10-01 2014-10-01 false State review and approval of nurse aide training...

  5. 42 CFR 483.151 - State review and approval of nurse aide training and competency evaluation programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Agencies: Nurse Aide Training and Competency Evaluation, and Paid Feeding Assistants § 483.151 State review and approval of nurse aide training and competency evaluation programs. (a) State review and... 42 Public Health 5 2013-10-01 2013-10-01 false State review and approval of nurse aide training...

  6. 42 CFR 413.79 - Direct GME payments: Determination of the weighted number of FTE residents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the initial residency period for a resident in an approved child neurology program is the period of... approved preventive medicine residency or fellowship program also may be counted as a full FTE resident for... in geriatric medicine, accredited by the appropriate approving body listed in § 415.152 of this...

  7. 40 CFR 272.1800 - State authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., November 8, 1984), 42 U.S.C. 6926 (c) and (g). The Federal program for which a State may receive... Protection Agency, was approved by EPA pursuant to 42 U.S.C. 6926(b) and part 271 of this chapter. EPA's approval of Ohio's base RCRA program was effective on June 30, 1989 (see 54 FR 27173). EPA's approval of...

  8. 40 CFR 272.1800 - State authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., November 8, 1984), 42 U.S.C. 6926 (c) and (g). The Federal program for which a State may receive... Protection Agency, was approved by EPA pursuant to 42 U.S.C. 6926(b) and part 271 of this chapter. EPA's approval of Ohio's base RCRA program was effective on June 30, 1989 (see 54 FR 27173). EPA's approval of...

  9. 40 CFR 272.1800 - State authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., November 8, 1984), 42 U.S.C. 6926 (c) and (g). The Federal program for which a State may receive... Protection Agency, was approved by EPA pursuant to 42 U.S.C. 6926(b) and part 271 of this chapter. EPA's approval of Ohio's base RCRA program was effective on June 30, 1989 (see 54 FR 27173). EPA's approval of...

  10. 40 CFR 272.1800 - State authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., November 8, 1984), 42 U.S.C. 6926 (c) and (g). The Federal program for which a State may receive... Protection Agency, was approved by EPA pursuant to 42 U.S.C. 6926(b) and part 271 of this chapter. EPA's approval of Ohio's base RCRA program was effective on June 30, 1989 (see 54 FR 27173). EPA's approval of...

  11. 10 CFR 707.5 - Submission, approval, and implementation of a baseline workplace substance abuse program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Submission, approval, and implementation of a baseline... PROGRAMS AT DOE SITES Procedures § 707.5 Submission, approval, and implementation of a baseline workplace... with the requirements of this part and the guidelines of the Department of Health and Human Services...

  12. 10 CFR 707.5 - Submission, approval, and implementation of a baseline workplace substance abuse program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Submission, approval, and implementation of a baseline... PROGRAMS AT DOE SITES Procedures § 707.5 Submission, approval, and implementation of a baseline workplace... with the requirements of this part and the guidelines of the Department of Health and Human Services...

  13. A World Wide Web-based antimicrobial stewardship program improves efficiency, communication, and user satisfaction and reduces cost in a tertiary care pediatric medical center.

    PubMed

    Agwu, Allison L; Lee, Carlton K K; Jain, Sanjay K; Murray, Kara L; Topolski, Jason; Miller, Robert E; Townsend, Timothy; Lehmann, Christoph U

    2008-09-15

    Antimicrobial stewardship programs aim to reduce inappropriate hospital antimicrobial use. At the Johns Hopkins Children's Medical and Surgical Center (Baltimore, MD), we implemented a World Wide Web-based antimicrobial restriction program to address problems with the existing restriction program. A user survey identified opportunities for improvement of an existing antimicrobial restriction program and resulted in subsequent design, implementation, and evaluation of a World Wide Web-based antimicrobial restriction program at a 175-bed, tertiary care pediatric teaching hospital. The program provided automated clinical decision support, facilitated approval, and enhanced real-time communication among prescribers, pharmacists, and pediatric infectious diseases fellows. Approval status, duration, and rationale; missing request notifications; and expiring approvals were stored in a database that is accessible via a secure Intranet site. Before and after implementation of the program, user satisfaction, reports of missed and/or delayed doses, antimicrobial dispensing times, and cost were evaluated. After implementation of the program, there was a $370,069 reduction in projected annual cost associated with restricted antimicrobial use and an 11.6% reduction in the number of dispensed doses. User satisfaction increased from 22% to 68% and from 13% to 69% among prescribers and pharmacists, respectively. There were 21% and 32% reductions in the number of prescriber reports of missed and delayed doses, respectively, and there was a 37% reduction in the number of pharmacist reports of delayed approvals; measured dispensing times were unchanged (P = .24). In addition, 40% fewer restricted antimicrobial-related phone calls were noted by the pharmacy. The World Wide Web-based antimicrobial approval program led to improved communication, more-efficient antimicrobial administration, increased user satisfaction, and significant cost savings. Integrated tools, such as this World Wide Web-based antimicrobial approval program, will effectively enhance antimicrobial stewardship programs.

  14. 49 CFR 1522.113 - Withdrawal of approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY SECURITY RULES FOR ALL MODES OF TRANSPORTATION TSA-APPROVED VALIDATION FIRMS AND VALIDATORS TSA-Approved Validation Firms and Validators for the Certified Cargo Screening Program... TSA-approved validation firm if the validation firm ceases to meet the standards for approval, fails...

  15. 46 CFR 162.060-32 - Testing and evaluation requirements for active substances, preparations, and relevant chemicals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... substances, preparations, and relevant chemicals. 162.060-32 Section 162.060-32 Shipping COAST GUARD... APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-32 Testing and evaluation requirements for active substances, preparations, and relevant chemicals. (a) A ballast water management system...

  16. 46 CFR 162.060-32 - Testing and evaluation requirements for active substances, preparations, and relevant chemicals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... substances, preparations, and relevant chemicals. 162.060-32 Section 162.060-32 Shipping COAST GUARD... APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-32 Testing and evaluation requirements for active substances, preparations, and relevant chemicals. (a) A ballast water management system...

  17. 46 CFR 162.060-32 - Testing and evaluation requirements for active substances, preparations, and relevant chemicals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... substances, preparations, and relevant chemicals. 162.060-32 Section 162.060-32 Shipping COAST GUARD... APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-32 Testing and evaluation requirements for active substances, preparations, and relevant chemicals. (a) A ballast water management system...

  18. 30 CFR 18.96 - Preparation of machines for inspection; requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Preparation of machines for inspection... Field Approval of Electrically Operated Mining Equipment § 18.96 Preparation of machines for inspection; requirements. (a) Upon receipt of written notice from the Health and Safety District Manager of the time and...

  19. 30 CFR 18.96 - Preparation of machines for inspection; requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Preparation of machines for inspection... Field Approval of Electrically Operated Mining Equipment § 18.96 Preparation of machines for inspection; requirements. (a) Upon receipt of written notice from the Health and Safety District Manager of the time and...

  20. 30 CFR 18.96 - Preparation of machines for inspection; requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Preparation of machines for inspection... Field Approval of Electrically Operated Mining Equipment § 18.96 Preparation of machines for inspection; requirements. (a) Upon receipt of written notice from the Health and Safety District Manager of the time and...

  1. 24 CFR 990.300 - Preparation of operating budget.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Preparation of operating budget... Resident Management Corporations (RMCs) § 990.300 Preparation of operating budget. (a) The RMC and the PHA must submit operating budgets and calculations of operating subsidy to HUD for approval in accordance...

  2. Exercise to Counteract Loss of Bone and Muscle During Androgen Deprivation Therapy in Men with Prostate Cancer

    DTIC Science & Technology

    2009-08-01

    finishers in the current study on age and body mass index . This will enable us to evaluate BMD and body composition changes in response to exercise in men...support from the Clinical Nutrition Research Unit (CNRU) • prepare data forms • prepare data base • train research staff Final approval of the protocol...the local IRB on 19 Feb 2008. In the past year, the consent form underwent minor changes to update standard language used by the local IRB (approved

  3. Common Ground: An Interactive Visual Exploration and Discovery for Complex Health Data

    DTIC Science & Technology

    2015-12-01

    PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for public ...Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for...Maryland 21702-5012 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION / AVAILABILITY STATEMENT Approved for Public Release; Distribution

  4. 77 FR 6856 - Agency Requests Approval To Extend Information Collection(s): Section 410 Alcohol Impaired...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-09

    ... DEPARTMENT OF TRANSPORTATION National Highway Traffic Safety Administration [U.S. DOT Docket No. NHTSA-2012-0012] Agency Requests Approval To Extend Information Collection(s): Section 410 Alcohol... extend information collection. The collection involves preparation of certifications, and documents...

  5. Alabama Commission on Higher Education 1986 Annual Report.

    ERIC Educational Resources Information Center

    Alabama State Commission on Higher Education, Montgomery.

    The 1986 annual report outlines planning and coordination activities and student financial aid programs. The following planning and coordination activities are considered: statewide planning and facilities planning, a new program approval procedure, approval of off-campus offerings, studies of the state's engineering programs and needs and allied…

  6. 76 FR 22411 - Notice of Proposed Information Collection: Comment Request; Housing Counseling Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-21

    ... Information Collection: Comment Request; Housing Counseling Program--Application for Approval as a Housing Counseling Agency AGENCY: Office of the Assistant Secretary for Housing, HUD. ACTION: Notice. SUMMARY: The...: Title of Proposal: Housing Counseling Program--Application for Approval as a Housing Counseling Agency...

  7. 14 CFR 91.1437 - CAMP: Authority to perform and approve maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Ownership Operations Program Management § 91.1437 CAMP: Authority to perform and approve maintenance. A program manager who maintains program aircraft under a CAMP may employ maintenance personnel, or make... maintenance. 91.1437 Section 91.1437 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF...

  8. 40 CFR 52.241 - Inspection and maintenance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.241 Inspection and maintenance program. (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision to the California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy...

  9. 40 CFR 52.241 - Inspection and maintenance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.241 Inspection and maintenance program. (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision to the California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy...

  10. 40 CFR 52.241 - Inspection and maintenance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.241 Inspection and maintenance program. (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision to the California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy...

  11. 40 CFR 52.241 - Inspection and maintenance program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.241 Inspection and maintenance program. (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision to the California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy...

  12. 78 FR 5350 - Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ...] Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... modification of its approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final... solid waste landfills by approved states. On December 7, 2012 Massachusetts submitted an application to...

  13. 77 FR 27712 - Notice of Request for Revision and Extension of Approval of an Information Collection; National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... an Information Collection; National Veterinary Accreditation Program AGENCY: Animal and Plant Health... approval of an information collection associated with the National Veterinary Accreditation Program. DATES...: For information on the National Veterinary Accreditation Program, contact Dr. Todd Behre, Veterinary...

  14. 7 CFR 996.22 - USDA-approved laboratory.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false USDA-approved laboratory. 996.22 Section 996.22... STANDARDS FOR DOMESTIC AND IMPORTED PEANUTS MARKETED IN THE UNITED STATES Definitions § 996.22 USDA-approved laboratory. USDA-approved laboratory means laboratories approved by the Science and Technology Programs...

  15. 7 CFR 996.22 - USDA-approved laboratory.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false USDA-approved laboratory. 996.22 Section 996.22... STANDARDS FOR DOMESTIC AND IMPORTED PEANUTS MARKETED IN THE UNITED STATES Definitions § 996.22 USDA-approved laboratory. USDA-approved laboratory means laboratories approved by the Science and Technology Programs...

  16. 7 CFR 996.22 - USDA-approved laboratory.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false USDA-approved laboratory. 996.22 Section 996.22... STANDARDS FOR DOMESTIC AND IMPORTED PEANUTS MARKETED IN THE UNITED STATES Definitions § 996.22 USDA-approved laboratory. USDA-approved laboratory means laboratories approved by the Science and Technology Programs...

  17. 7 CFR 996.22 - USDA-approved laboratory.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false USDA-approved laboratory. 996.22 Section 996.22... STANDARDS FOR DOMESTIC AND IMPORTED PEANUTS MARKETED IN THE UNITED STATES Definitions § 996.22 USDA-approved laboratory. USDA-approved laboratory means laboratories approved by the Science and Technology Programs...

  18. Soil Fumigant Training for Certified Applicators

    EPA Pesticide Factsheets

    This page includes the soil fumigant training programs developed by pesticide registrants and approved by EPA, as well as EPA-approved alternatives to the registrant training programs that are available for specific states.

  19. Enzymes approved for human therapy: indications, mechanisms and adverse effects.

    PubMed

    Baldo, Brian A

    2015-02-01

    Research and drug developments fostered under orphan drug product development programs have greatly assisted the introduction of efficient and safe enzyme-based therapies for a range of rare disorders. The introduction and regulatory approval of 20 different recombinant enzymes has enabled, often for the first time, effective enzyme-replacement therapy for some lysosomal storage disorders, including Gaucher (imiglucerase, taliglucerase, and velaglucerase), Fabry (agalsidase alfa and beta), and Pompe (alglucosidase alfa) diseases and mucopolysaccharidoses I (laronidase), II (idursulfase), IVA (elosulfase), and VI (galsulfase). Approved recombinant enzymes are also now used as therapy for myocardial infarction (alteplase, reteplase, and tenecteplase), cystic fibrosis (dornase alfa), chronic gout (pegloticase), tumor lysis syndrome (rasburicase), leukemia (L-asparaginase), some collagen-based disorders such as Dupuytren's contracture (collagenase), severe combined immunodeficiency disease (pegademase bovine), detoxification of methotrexate (glucarpidase), and vitreomacular adhesion (ocriplasmin). The development of these efficacious and safe enzyme-based therapies has occurred hand in hand with some remarkable advances in the preparation of the often specifically designed recombinant enzymes; the manufacturing expertise necessary for commercial production; our understanding of underlying mechanisms operative in the different diseases; and the mechanisms of action of the relevant recombinant enzymes. Together with information on these mechanisms, safety findings recorded so far on the various adverse events and problems of immunogenicity of the recombinant enzymes used for therapy are presented.

  20. 75 FR 82535 - Limitation of Approval of Prevention of Significant Deterioration Provisions Concerning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ...This action is another in a series of steps EPA is taking to implement the Prevention of Significant Deterioration (PSD) program for greenhouse gas (GHG)-emitting sources. EPA is finalizing its proposed rulemaking to narrow its previous approval of State Implementation Plan (SIP) PSD programs in 24 states that apply to GHG-emitting sources. Specifically, EPA is withdrawing its previous approval of those programs to the extent they apply PSD to GHG-emitting sources below the thresholds in the final Tailoring Rule, which EPA promulgated by Federal Register notice dated June 3, 2010. Having narrowed its prior approval, EPA asks that each affected state withdraw from EPA consideration the part of its SIP that is no longer approved. The states for whose SIPs EPA is narrowing approval are: Alabama, California, Colorado, Georgia, Indiana, Iowa, Louisiana, Maine, Maryland, Mississippi, Missouri, New Hampshire, New Mexico, North Carolina, Ohio, Oklahoma, Rhode Island, South Carolina, South Dakota, Tennessee, Utah, Vermont, Virginia, and Wisconsin.

  1. 29 CFR 5.17 - Withdrawal of approval of a training program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTRACTS SUBJECT TO THE CONTRACT WORK HOURS AND SAFETY STANDARDS ACT) Davis-Bacon and Related Acts... for the classification of work actually performed until an acceptable program is approved. ...

  2. 29 CFR 5.17 - Withdrawal of approval of a training program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... NONCONSTRUCTION CONTRACTS SUBJECT TO THE CONTRACT WORK HOURS AND SAFETY STANDARDS ACT) Davis-Bacon and Related... for the classification of work actually performed until an acceptable program is approved. ...

  3. Independence Community College Property Appraisal/Assessment Program.

    ERIC Educational Resources Information Center

    Swender, Herbert J.

    This report to the Kansas State Department of Education supports Independence Community College's (ICC's) request for approval of a new vocational education program in Property Appraisal/Assessment. The report begins with two letters of support and the application for new program approval. Next, a project narrative provides background information…

  4. 15 CFR 923.133 - Procedure for conducting continuing reviews of approved State CZM programs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS... performance of coastal States with respect to coastal management. Each review shall include a written... and enforced the program approved by the Secretary, addressed the coastal management needs identified...

  5. 15 CFR 923.133 - Procedure for conducting continuing reviews of approved State CZM programs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS... performance of coastal States with respect to coastal management. Each review shall include a written... and enforced the program approved by the Secretary, addressed the coastal management needs identified...

  6. 7 CFR 2201.23 - Funding for the Program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the Program and operate the Program accordingly. (b) Credit Risk Premium—(1) Establishment and approval. The Board may establish and approve the acceptance of credit risk premiums with respect to a..., credit risk premiums shall be accepted from a non-Federal source on behalf of a Borrower. (2) Credit risk...

  7. 50 CFR 15.26 - Approval of cooperative breeding programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 1 2014-10-01 2014-10-01 false Approval of cooperative breeding programs. 15.26 Section 15.26 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE... program requested for the exotic bird species, including: (i) A breeding protocol, including a genetic...

  8. 50 CFR 15.26 - Approval of cooperative breeding programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 1 2013-10-01 2013-10-01 false Approval of cooperative breeding programs. 15.26 Section 15.26 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE... program requested for the exotic bird species, including: (i) A breeding protocol, including a genetic...

  9. 50 CFR 15.26 - Approval of cooperative breeding programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 1 2012-10-01 2012-10-01 false Approval of cooperative breeding programs. 15.26 Section 15.26 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE... program requested for the exotic bird species, including: (i) A breeding protocol, including a genetic...

  10. 78 FR 57208 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ... LEVEL: End of runway deicing program--phase 1, runway 34R. Taxiway S pavement reconstruction. Replace carousel 9 and oversized bag belt TU3. Terminal redevelopment program--design and associated technical... APPROVED FOR COLLECTION AND USE: PFC program administration. Design taxiways A, L and B. BRIEF DESCRIPTION...

  11. 49 CFR 242.103 - Approval of design of individual railroad programs by FRA.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Approval of design of individual railroad programs by FRA. 242.103 Section 242.103 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION QUALIFICATION AND CERTIFICATION OF CONDUCTORS Program and Eligibility Requirements...

  12. Trainee Impairment in APA Approved Internship and Graduate Programs.

    ERIC Educational Resources Information Center

    Rangel, Deborah Marie; Boxley, Russell

    All programs that are involved in training professionals have some experience with impaired trainees. A study was conducted to examine how different American Psychological Association (APA) approved pre-doctoral internship and graduate programs in psychology handle trainee difficulty and impairment. A 62-item questionnaire was completed by…

  13. 33 CFR 263.20 - Program funding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... authorities of this Program will be utilized by the Corps of Engineers in conducting studies approved by... grants of Program funds will be made to local interests for conducting studies or constructing projects... Engineer to proceed with a feasibility study, after submission of a DPR to OCE and approval of the Division...

  14. 33 CFR 263.20 - Program funding.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... authorities of this Program will be utilized by the Corps of Engineers in conducting studies approved by... grants of Program funds will be made to local interests for conducting studies or constructing projects... Engineer to proceed with a feasibility study, after submission of a DPR to OCE and approval of the Division...

  15. 76 FR 9041 - Intent To Request Approval From OMB of One New Public Collection of Information: Security Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-16

    ... measure their effectiveness. Through its voluntary Corporate Security Review (CSR) Program, TSA's Highway... DEPARTMENT OF HOMELAND SECURITY Transportation Security Administration Intent To Request Approval From OMB of One New Public Collection of Information: Security Program for Hazardous Materials Motor...

  16. 78 FR 77418 - Notice of Request for Revision of a Currently Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... to a currently approved information collection for the Advanced Biofuel Payment Program. DATES... INFORMATION: Title: Advanced Biofuel Payment Program. OMB Number: OMB No. 0570-0063. Expiration Date of... collection. Abstract: The Advanced Biofuel Payment Program was authorized under section 9005 of Title IX of...

  17. 76 FR 270 - Alaska: Adequacy of Alaska Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ...] Alaska: Adequacy of Alaska Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... approved Municipal Solid Waste Landfill (MSWLF) permit program. The approved modification allows the State..., EPA issued a final rule (69 FR 13242) amending the Municipal Solid Waste Landfill (MSWLF) criteria in...

  18. 75 FR 53268 - Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ...] Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... modification of its approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final... solid waste landfills by approved states. On June 28, 2010 New Hampshire submitted an application to EPA...

  19. 30 CFR 906.15 - Approval of Colorado regulatory program amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Colorado regulatory program amendments. 906.15 Section 906.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE COLORADO...

  20. 42 CFR 493.645 - Additional fee(s) applicable to approved State laboratory programs and laboratories issued a...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY REQUIREMENTS General Administration § 493.645 Additional fee(s) applicable to approved State laboratory programs and... laboratory programs and laboratories issued a certificate of accreditation, certificate of waiver, or...

  1. 40 CFR 282.96 - Virginia State-Administered Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...” includes heating oil tanks of greater than 5,000 gallon capacity and “Regulated substance” 9 VAC 25-580-130General requirements for all petroleum and hazardous substance UST systems, heating oil tanks of greater... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.96 Virginia...

  2. 7 CFR 1942.5 - Application review and approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Public Law 103-354 by written amendment to this letter. Any changes not approved by FmHA or its successor... Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS... complete the project summary, including written analysis and recommendations, and will prepare a draft...

  3. 15 CFR 923.60 - Review/approval procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Review/Approval Procedures § 923.60 Review/approval...

  4. 15 CFR 923.60 - Review/approval procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Review/Approval Procedures § 923.60 Review/approval...

  5. Qualitative and quantitative measures of various compounded formulations of 17-hydroxyprogesterone caproate

    PubMed Central

    CARITIS, Steve N.; ZHAO, Yang; BETTINGER, Joseph; VENKATARAMANAN, Raman

    2013-01-01

    Objectives 17-hydroxyprogesterone caproate (17-OHPC) is available both as an FDA – approved medication and as a product prepared for individual patients by compounding pharmacies. Compounding pharmacies may omit the preservative used in the FDA approved formulation or use an alternate preservative and may dispense 17-OHPC in containers that differ from the FDA-approved product. The objective of this study was to assess the stability, microbiological and pyrogen status of 17-OHPC formulations under various compounding and dispensing conditions. Methods 17-OHPC was prepared by a local compounding pharmacy. The formulations prepared included one identical to the FDA approved product with benzyl alcohol as a preservative, one with benzalkonium chloride as a preservative and one without a preservative. These various formulations were dispensed into either single dose 1 ml plastic syringes or glass vials or 10 ml glass vials. Concentration of 17-OHPC and microbial and pyrogen status were evaluated at various time intervals over the ensuing 19 weeks. Results The concentration of 17-OHPC did not change over the duration of study regardless of the dispensing medium used or the absence or presence of any preservatives. The preparations remained microbe and pyrogen free during the study period regardless of the dispensing medium used or the absence of presence of any preservatives. Conclusions Products containing 17-OPHC tested in this study were quite stable over the 19-week period of study in different dispensing containers and in absence or presence of a different preservative. The compounded products remained sterile and pyrogen free during the period of observation. PMID:23453884

  6. Administrator, National Security Education Program

    DTIC Science & Technology

    1993-01-19

    1. Administer, direct, and manage the resources for the lit program. 2. Establish and direct an international education center, as approved by the...approve the hiring of, and evaluate the performance of personnel who staff the international education center. 4. Ensure appropriate internal management...Administrator, National Security Education Program * References: (a) DoD Directive 1025.2 , "National Security * Education Program," January 13, 1993

  7. 40 CFR 403.11 - Approval procedures for POTW pretreatment programs and POTW granting of removal credits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GENERAL PRETREATMENT REGULATIONS FOR EXISTING AND NEW SOURCES OF POLLUTION § 403.11 Approval procedures for POTW pretreatment programs...

  8. 78 FR 57501 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Amendments to Vehicle...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ...EPA is approving a state implementation plan (SIP) revision submitted by the Wisconsin Department of Natural Resources on June 7, 2012, concerning the state's vehicle inspection and maintenance (I/M) program in southeast Wisconsin. The revision amends I/M program requirements in the active control measures portion of the ozone SIP to reflect changes that have been implemented at the state level since EPA fully approved the I/M program on August 16, 2001. The submittal also includes a demonstration under section 110(l) of the Clean Air Act (CAA) addressing lost emission reductions associated with the program changes.

  9. 42 CFR 137.360 - Does the Secretary approve project planning and design documents prepared by the Self-Governance...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... design documents prepared by the Self-Governance Tribe? 137.360 Section 137.360 Public Health PUBLIC... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in Establishing and... documents prepared by the Self-Governance Tribe? The Secretary shall have at least one opportunity to...

  10. 75 FR 54943 - Notice of Request To Revise a Currently-Approved Information Collection Request: Motor Carrier...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... required consists of grant application preparation, quarterly reports and electronic data documenting the...: 52. Estimated Time per Response: Grant application preparation: 79.5 hours each; quarterly report preparation: 8 hours each; and inspection and data upload: 1 minute each. Expiration Date: February 28, 2011...

  11. A Report from the Higher Education Review Board (HERB): Assessment of Undergraduate Student Learning Outcomes in Food Science

    ERIC Educational Resources Information Center

    Hartel, R. W.; Iwaoka, W. T.

    2016-01-01

    For the past 15 years, Institute of Food Technologists (IFT) has mandated assessment of undergraduate student learning outcomes as the basis for approving food science (FS) programs. No longer is a check-off course system sufficient to be an IFT-approved program. The 4 steps to gaining IFT approval include developing learning outcomes for all…

  12. 75 FR 29336 - Penobscot River Restoration Trust; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... Projects has prepared an Final Environmental Assessment (FEA) for an application filed by the Penobscot... Comprehensive Settlement Agreement. The FEA evaluates the environmental impacts that would result from approving the licensee's proposed surrenders. The FEA finds that approval of the application would not...

  13. 9 CFR 590.435 - Wholesomeness and approval of materials.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION INSPECTION OF EGGS AND EGG PRODUCTS (EGG PRODUCTS INSPECTION ACT) Entry of Material into Official Egg Products Plants § 590.435 Wholesomeness and approval of materials. (a) Substances and ingredients used in the manufacture or preparation of any egg product capable...

  14. 7 CFR 1710.206 - Approval requirements for load forecasts prepared pursuant to approved load forecast work plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... effects on electric revenues caused by competition from alternative energy sources or other electric... uncertainty or alternative futures that may determine the borrower's actual loads. Examples of economic... basis. Include alternative futures, as applicable. This summary shall be designed to accommodate the...

  15. 7 CFR 1710.206 - Approval requirements for load forecasts prepared pursuant to approved load forecast work plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... effects on electric revenues caused by competition from alternative energy sources or other electric... uncertainty or alternative futures that may determine the borrower's actual loads. Examples of economic... basis. Include alternative futures, as applicable. This summary shall be designed to accommodate the...

  16. 7 CFR 1710.206 - Approval requirements for load forecasts prepared pursuant to approved load forecast work plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... effects on electric revenues caused by competition from alternative energy sources or other electric... uncertainty or alternative futures that may determine the borrower's actual loads. Examples of economic... basis. Include alternative futures, as applicable. This summary shall be designed to accommodate the...

  17. 7 CFR 1710.206 - Approval requirements for load forecasts prepared pursuant to approved load forecast work plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... effects on electric revenues caused by competition from alternative energy sources or other electric... uncertainty or alternative futures that may determine the borrower's actual loads. Examples of economic... basis. Include alternative futures, as applicable. This summary shall be designed to accommodate the...

  18. 33 CFR 157.12g - Plan approval requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OIL IN BULK Design, Equipment, and Installation § 157.12g Plan approval requirements. Adequate documentation must be prepared well in advance of the intended installation of a monitoring system and must be... ballast handling manuals. Special considerations will be given to installations in oil tankers, which have...

  19. Schools, Parents, and Textbooks.

    ERIC Educational Resources Information Center

    Bell, T. H.

    Publishers, authors, and the schools must be more respectful of parents' values in the preparation and selection of children's books. The use of obscene words, violence, explicit sex, and seeming approval of controversial positions in texts causes many problems. Although the approval of all parents obviously cannot be won, the children's book…

  20. 78 FR 70497 - Approval and Promulgation of Air Quality Implementation Plans; Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ...] Approval and Promulgation of Air Quality Implementation Plans; Illinois AGENCY: Environmental Protection... VOC for purposes of preparing SIPs to attain the national ambient air quality standard for ozone [email protected] . 3. Fax: (312) 692-2450. 4. Mail: Pamela Blakley, Chief, Control Strategies Section, Air...

  1. 48 CFR 45.606-1 - Contractor with an approved scrap procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... production or testing under this contract without Government approval. However, if the scrap requires... schedule. (b) For scrap from other than production or testing, the contractor may prepare scrap lists in..., flight safety critical aircraft parts, and scrap that— (1) Requires demilitarization; (2) Is a classified...

  2. 48 CFR 45.606-1 - Contractor with an approved scrap procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... production or testing under this contract without Government approval. However, if the scrap requires... schedule. (b) For scrap from other than production or testing, the contractor may prepare scrap lists in..., flight safety critical aircraft parts, and scrap that— (1) Requires demilitarization; (2) Is a classified...

  3. 49 CFR 190.9 - Petitions for finding or approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Petitions for finding or approval. 190.9 Section... PROGRAMS AND RULEMAKING PROCEDURES General § 190.9 Petitions for finding or approval. (a) In circumstances... finding or approval, an operator may petition the Administrator for such a finding or approval. (b) Each...

  4. 78 FR 49736 - Revision of a Currently Approved Information Collection for the Energy Efficiency and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... Efficiency and Conservation Block Grant Program Status Report AGENCY: U.S. Department of Energy. ACTION... Conservation Block Grant (EECBG) Program is available for review at the following Web sites: http://www1.eere... and Conservation Block Grant (EECBG) Program Status Report''; (3) Revision of currently approved...

  5. 25 CFR 273.17 - Programs approved by Indian Education Committee.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Programs approved by Indian Education Committee. 273.17 Section 273.17 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.17...

  6. 25 CFR 273.17 - Programs approved by Indian Education Committee.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Programs approved by Indian Education Committee. 273.17 Section 273.17 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.17...

  7. 25 CFR 273.17 - Programs approved by Indian Education Committee.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Programs approved by Indian Education Committee. 273.17 Section 273.17 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.17...

  8. 76 FR 19739 - Approval and Promulgation of Implementation Plans; Texas; System Cap Trading Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0013; FRL-9290-1] Approval and Promulgation of Implementation Plans; Texas; System Cap Trading Program AGENCY: Environmental Protection Agency... the System Cap Trading (SCT) Program at Title 30 Texas Administrative Code, Chapter 101--General Air...

  9. 77 FR 24488 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Activities; Submission to OMB for Review and Approval; Comment Request; Landfill Methane Outreach Program... the electronic docket, go to www.regulations.gov . Title: Landfill Methane Outreach Program (Renewal... consolidated in 40 CFR part 9. Abstract: The Landfill Methane Outreach Program (LMOP), created by EPA as part...

  10. 76 FR 43649 - Notice of Request for Extension of Approval of an Information Collection; Scrapie in Sheep and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ...; Interstate Movement Restrictions and Indemnity Program AGENCY: Animal and Plant Health Inspection Service... with regulations for the interstate movement of sheep and goats and an indemnity program to control the... Movement Restrictions and Indemnity Program. OMB Number: 0579-0101. Type of Request: Extension of approval...

  11. 78 FR 25093 - Multistate Conservation Grant Program; Priority List and Approval for Conservation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... Fish Restoration Act (16 U.S.C. 777 et seq.) and established the Multistate Conservation Grant Program...-9410-0000] Multistate Conservation Grant Program; Priority List and Approval for Conservation Projects... year 2013 priority list of wildlife and sport fish conservation projects from the Association of Fish...

  12. 76 FR 709 - Guidelines for Awarding Clean Water Act Section 319 Base Grants to Indian Tribes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... in implementing approved NPS management programs developed pursuant to section 319(b). The primary goal of the NPS management program is to control NPS pollution through implementation of management... may be used for a range of activities that implement the tribe's approved NPS management program...

  13. 48 CFR 1819.7203 - Mentor approval process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...

  14. 48 CFR 1819.7203 - Mentor approval process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...

  15. 48 CFR 1819.7203 - Mentor approval process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...

  16. 48 CFR 1819.7203 - Mentor approval process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...

  17. 48 CFR 1819.7203 - Mentor approval process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...

  18. 44 CFR 361.5 - Criteria for program assistance, matching contributions, and return of program assistance funds.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... statement of work is approved. (Approved by the Office of Management and Budget under OMB control number... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Criteria for program... Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS...

  19. 77 FR 1895 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ... approve South Coast Air Quality Management District (SCAQMD) Rule 317, ``Clean Air Act Non- Attainment Fee... Rule 317, an equivalent alternative program, is not less stringent than the program required by section... equivalent alternative programs, and, if so, whether Rule 317 would constitute an approvable equivalent...

  20. 7 CFR 205.621 - Submission and determination of proposed State organic programs and amendments to approved State...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) ORGANIC FOODS PRODUCTION ACT PROVISIONS NATIONAL... 7 Agriculture 3 2010-01-01 2010-01-01 false Submission and determination of proposed State organic programs and amendments to approved State organic programs. 205.621 Section 205.621 Agriculture Regulations...

  1. 30 CFR 944.15 - Approval of Utah regulatory program amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 816/817.61; 850; Memorandum of Agreement between the Board and Division of Oil, Gas, and Mining and... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Utah regulatory program amendments..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE UTAH § 944...

  2. 30 CFR 944.15 - Approval of Utah regulatory program amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 816/817.61; 850; Memorandum of Agreement between the Board and Division of Oil, Gas, and Mining and... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of Utah regulatory program amendments..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE UTAH § 944...

  3. 30 CFR 944.15 - Approval of Utah regulatory program amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 816/817.61; 850; Memorandum of Agreement between the Board and Division of Oil, Gas, and Mining and... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of Utah regulatory program amendments..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE UTAH § 944...

  4. 30 CFR 944.15 - Approval of Utah regulatory program amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 816/817.61; 850; Memorandum of Agreement between the Board and Division of Oil, Gas, and Mining and... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of Utah regulatory program amendments..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE UTAH § 944...

  5. 30 CFR 944.15 - Approval of Utah regulatory program amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 816/817.61; 850; Memorandum of Agreement between the Board and Division of Oil, Gas, and Mining and... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of Utah regulatory program amendments..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE UTAH § 944...

  6. 77 FR 37903 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ... Activities; Submission to OMB for Review and Approval; Comment Request; Risk Management Program Requirements... information about the electronic docket, go to www.regulations.gov . Title: Risk Management Program... process develop and implement a risk management program and submit a risk management plan to EPA. The...

  7. 78 FR 43918 - Agency Information Collection Activities: Extension of a Currently Approved Collection Semi...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ... Program. The Sexual Assault Services Program (SASP), created by the Violence Against Women Act of 2005... of a Currently Approved Collection Semi-Annual Progress Report for the Tribal Sexual Assault Services Program ACTION: 60-Day Notice. The Department of Justice, Office on Violence Against Women (OVW) will be...

  8. 40 CFR 52.27 - Protection of visibility from sources in attainment areas.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... quality standards for such pollutants, and where a State PSD program has been approved as part of the... Act, in the prevention of significant deterioration (PSD) program approved as part of the applicable...

  9. 40 CFR 52.27 - Protection of visibility from sources in attainment areas.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... quality standards for such pollutants, and where a State PSD program has been approved as part of the... Act, in the prevention of significant deterioration (PSD) program approved as part of the applicable...

  10. 40 CFR 52.27 - Protection of visibility from sources in attainment areas.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... quality standards for such pollutants, and where a State PSD program has been approved as part of the... Act, in the prevention of significant deterioration (PSD) program approved as part of the applicable...

  11. 40 CFR 52.27 - Protection of visibility from sources in attainment areas.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... quality standards for such pollutants, and where a State PSD program has been approved as part of the... Act, in the prevention of significant deterioration (PSD) program approved as part of the applicable...

  12. 40 CFR 52.27 - Protection of visibility from sources in attainment areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... quality standards for such pollutants, and where a State PSD program has been approved as part of the... Act, in the prevention of significant deterioration (PSD) program approved as part of the applicable...

  13. 77 FR 49799 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-April Through June 2012

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ...-Approved Lung JoAnna Baldwin, MS.. (410) 786-7205 Volume Reduction Surgery Facilities. XIV Medicare-Approved Kate Tillman, RN, (410) 786-9252 Bariatric Surgery MAS. Facilities. XV Fluorodeoxyglucose Stuart...

  14. 77 FR 29648 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-January Through March 2012

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... (Destination Therapy) Facilities. XIII Medicare-Approved Lung Volume Reduction Surgery JoAnna Baldwin, MS (410) 786-7205 Facilities. XIV Medicare-Approved Bariatric Surgery Facilities........ Kate Tillman, RN, MAS...

  15. 76 FR 68467 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-April Through June 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ...-Approved Lung JoAnna Baldwin, (410) 786-7205 Volume Reduction Surgery MS. Facilities. XIV Medicare-Approved Kate Tillman, RN, (410) 786-9252 Bariatric Surgery Facilities. MAS. XV Fluorodeoxyglucose Positron...

  16. 24 CFR 214.107 - Approval by HUD.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... COUNSELING PROGRAM Approval and Disapproval of Housing Counseling Agencies § 214.107 Approval by HUD. (a...) Appearance on list of HUD-approved and participating housing counseling agencies. For purposes of client referrals, participating agencies that provide housing counseling services directly to clients must provide...

  17. 24 CFR 214.107 - Approval by HUD.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... COUNSELING PROGRAM Approval and Disapproval of Housing Counseling Agencies § 214.107 Approval by HUD. (a...) Appearance on list of HUD-approved and participating housing counseling agencies. For purposes of client referrals, participating agencies that provide housing counseling services directly to clients must provide...

  18. 45 CFR 1326.21 - Application approval.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO INDIAN TRIBES FOR SUPPORT AND NUTRITION SERVICES § 1326.21 Application approval. (a) Approval of any...

  19. 45 CFR 1326.21 - Application approval.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO INDIAN TRIBES FOR SUPPORT AND NUTRITION SERVICES § 1326.21 Application approval. (a) Approval of any...

  20. 45 CFR 1326.21 - Application approval.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO INDIAN TRIBES FOR SUPPORT AND NUTRITION SERVICES § 1326.21 Application approval. (a) Approval of any...

  1. 45 CFR 1326.21 - Application approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO INDIAN TRIBES FOR SUPPORT AND NUTRITION SERVICES § 1326.21 Application approval. (a) Approval of any...

  2. 45 CFR 1326.21 - Application approval.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO INDIAN TRIBES FOR SUPPORT AND NUTRITION SERVICES § 1326.21 Application approval. (a) Approval of any...

  3. 77 FR 67368 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-July through September 2012

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ...) Facilities. XIII Medicare-Approved Lung JoAnna Baldwin, MS. (410) 786-7205 Volume Reduction Surgery Facilities. XIV Medicare-Approved Bariatric Kate Tillman, RN, (410) 786-9252 Surgery Facilities. MAS. XV...

  4. Approval Letter for an Alternative Renewable Biomass Tracking Program

    EPA Pesticide Factsheets

    This January 27, 2015 letter and decision document from EPA approves the Argentine Chamber of Biofuel's (CARBIO) Alternate Biomass Traking Program meeting all the requirements outlined in 40 CFR § 80.1454, including elements determined necessary to achieve

  5. 40 CFR 52.1219 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1219 Identification of plan—conditional approval. (a) On November 12, 1993, the Minnesota Pollution Control Agency submitted a revision request to Minnesota's carbon monoxide SIP for approval of the State's basic inspection...

  6. 40 CFR 52.1219 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1219 Identification of plan—conditional approval. (a) On November 12, 1993, the Minnesota Pollution Control Agency submitted a revision request to Minnesota's carbon monoxide SIP for approval of the State's basic inspection...

  7. 40 CFR 52.1219 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1219 Identification of plan—conditional approval. (a) On November 12, 1993, the Minnesota Pollution Control Agency submitted a revision request to Minnesota's carbon monoxide SIP for approval of the State's basic inspection...

  8. 40 CFR 52.1219 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1219 Identification of plan—conditional approval. (a) On November 12, 1993, the Minnesota Pollution Control Agency submitted a revision request to Minnesota's carbon monoxide SIP for approval of the State's basic inspection...

  9. 40 CFR 52.1219 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1219 Identification of plan—conditional approval. (a) On November 12, 1993, the Minnesota Pollution Control Agency submitted a revision request to Minnesota's carbon monoxide SIP for approval of the State's basic inspection...

  10. 29 CFR 1952.385 - Changes to approved plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Puerto Rico § 1952.385 Changes to... approved Puerto Rico's plan supplement, which is generally identical to the Federal Voluntary Protection... Program. (b) Legislation. (1) On March 29, 1994, the Assistant Secretary approved Puerto Rico's revised...

  11. 29 CFR 1952.385 - Changes to approved plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Puerto Rico § 1952.385 Changes to... approved Puerto Rico's plan supplement, which is generally identical to the Federal Voluntary Protection... Program. (b) Legislation. (1) On March 29, 1994, the Assistant Secretary approved Puerto Rico's revised...

  12. 29 CFR 1952.385 - Changes to approved plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Puerto Rico § 1952.385 Changes to... approved Puerto Rico's plan supplement, which is generally identical to the Federal Voluntary Protection... Program. (b) Legislation. (1) On March 29, 1994, the Assistant Secretary approved Puerto Rico's revised...

  13. 7 CFR 1944.415 - Grant approval and other approving authorities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) HOUSING Self-Help Technical Assistance... 7 Agriculture 13 2010-01-01 2009-01-01 true Grant approval and other approving authorities. 1944.415 Section 1944.415 Agriculture Regulations of the Department of Agriculture (Continued) RURAL...

  14. 10 CFR 171.8 - Information collection requirements: OMB approval

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Information collection requirements: OMB approval 171.8..., AND QUALITY ASSURANCE PROGRAM APPROVALS AND GOVERNMENT AGENCIES LICENSED BY THE NRC § 171.8 Information collection requirements: OMB approval This part contains no information collection requirements...

  15. 45 CFR 2400.42 - Approval of Plan of Study.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Approval of Plan of Study. 2400.42 Section 2400.42... FOUNDATION FELLOWSHIP PROGRAM REQUIREMENTS Graduate Study § 2400.42 Approval of Plan of Study. The Foundation must approve each Fellow's Plan of Study. To be approved, the plan must: (a) On a part-time or full...

  16. Crop-phenology and LANDSAT-based irrigated lands inventory in the high plains. [Texas, New Mexico, Oklahma, Kansas, Colorado, Nebraska, Wyoming, and South Dakota

    NASA Technical Reports Server (NTRS)

    Martinko, E. A. (Principal Investigator); Poracsky, J.; Kipp, E. R.; Krieger, H.

    1981-01-01

    Crop calendars for 1979 and 1980 were investigated in support of an effort to develop techniques for mapping the High Plains aquifer region. Optimal LANDSAT image dates for 1980 were preliminarily identified based on ESS weekly crop weather reports and 1979 ESS agricultural statistics were entered into the computer. A questionnaire was compiled and sent to ASCS county agents with the approval of the Extension Directors in each state involved. Data from returning questionnaires were tabulated and development started on a set of computer programs to allow the preparation of computer assisted graphic displays of much of the collected data.

  17. KSC-2009-5013

    NASA Image and Video Library

    2009-08-03

    CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility in Titusville, Fla., workers prepare to lift the SV1 and mate it to the SV2 spacecraft for the Space Tracking and Surveillance System – Demonstrators, or STSS Demo, Program. STSS-Demo is a space-based sensor component of a layered Ballistic Missile Defense System designed for the overall mission of detecting, tracking and discriminating ballistic missiles. The spacecraft is capable of tracking objects after boost phase and provides trajectory information to other sensors. It will be launched by NASA for the Missile Defense Agency between 8 and 8:58 a.m. EDT Sept. 18. Approved for Public Release 09-MDA-04886 (10 SEPT 09) Photo credit: NASA/Jim Grossmann

  18. 48 CFR 1819.7207 - Agreement submission and approval process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AND SPACE ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program... approved as mentors in accordance with 1819.7203, will submit to a Small Business Specialist at a NASA Center— (1) A signed mentor-protégé agreement pursuant to 1819.7206; (2) The estimated cost of the...

  19. 48 CFR 819.7108 - Application process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS VA Mentor-Protégé Program 819.7108 Application process. (a) Firms interested in becoming approved mentor-protégé participants must submit a joint written VA Mentor-Protégé Agreement to the VA OSDBU for review and approval. The proposed Mentor-Protégé Agreement will be...

  20. 77 FR 64344 - Medicare and Medicaid Programs; Approval of the Community Health Accreditation Program for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    .... Regulations concerning provider agreements are at 42 CFR part 489 and those pertaining to activities relating to the survey and certification of facilities are at 42 CFR part 488. The regulations at 42 CFR part... accrediting organization applying for approval of its accreditation program under part 488, subpart A, must...

  1. 76 FR 28727 - Child Nutrition (CN) Labeling Program; Request for Extension and Revision of a Currently Approved...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service [Doc. No. AMS-FV-11-0015] Child Nutrition... Nutrition Labeling Program. DATES: Comments on this document must be received by July 18, 2011 to be assured... INFORMATION: Title: Child Nutrition Labeling Program. OMB Number: 0581-0261 . Expiration Date of Approval: 3...

  2. 77 FR 70748 - Information Collection Request Submitted to OMB for Review and Approval; Comment Request; Acid...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... Submitted to OMB for Review and Approval; Comment Request; Acid Rain Program Under Title IV of the Clean Air... Environmental Protection Agency has submitted an information collection request (ICR), Acid Rain Program under... http://www.epa.gov/dockets . Abstract: The Acid Rain Program was established under Title IV of the 1990...

  3. 78 FR 64423 - Children's Online Privacy Protection Rule Applications for Approval of Proposed Parental Consent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ..., Inc.; Application for Approval of Safe Harbor Program by kidSAFE Seal Program AGENCY: Federal Trade... kidSAFE Seal Program (``kidSAFE''), owned and operated by Samet Privacy, LLC, under the safe harbor... following the instructions on the web-based form. For comments concerning kidSAFE, write ``kidSAFE...

  4. 77 FR 16509 - Proposed Approval of Revision of Five California Clean Air Act Title V Operating Permits Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Approval of Revision of Five California Clean Air Act Title V Operating Permits Programs AGENCY... the Operating Permits (Title V) programs of the Monterey Bay Unified Air Pollution Control District... been previously subject to Title V for other reasons to obtain a Title V permit. See ``Prevention of...

  5. 15 CFR 923.95 - Approval of applications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Applications for Program Development or Implementation Grants § 923.95 Approval of applications. (a) The application for a grant by any coastal State which...

  6. 15 CFR 923.95 - Approval of applications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Applications for Program Development or Implementation Grants § 923.95 Approval of applications. (a) The application for a grant by any coastal State which...

  7. The Tropical Disease Priority Review Voucher: A Game-Changer for Tropical Disease Products

    PubMed Central

    Berman, Jonathan; Radhakrishna, Tanya

    2017-01-01

    The Neglected Tropical Disease Voucher Program is a Congressionally-mandated program intended to promote approval of products for tropical diseases because it provides spectacular financial compensation consequent to FDA approval of a priority product. Three drug approvals–artemether/lumifantrine for malaria, bedaquiline for multidrug resistant tuberculosis, miltefosine for leishmaniasis–have received Tropical Disease Vouchers to date. We give our view of the type of products that might qualify for a Tropical Disease Voucher, financial considerations in venturing capital to support product development, clinical ramifications of a successful product approval, and an overall evaluation of the Program. PMID:27573627

  8. 40 CFR 52.2119 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) South Carolina § 52.2119 Identification of plan-conditional approval. EPA is conditionally approving a revision to the South Carolina State Implementation Plan (SIP) consisting of a new Standard (South Carolina Regulation 61-62.5 Standard...

  9. 75 FR 983 - Cross-Media Electronic Reporting Rule State Approved Program Revision/Modification Approvals...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9099-3] Cross-Media Electronic Reporting Rule State Approved...). ACTION: Notice. SUMMARY: This notice announces EPA's approval, under regulations for Cross-Media..., [email protected] . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic...

  10. 40 CFR 52.1525 - EPA-approved new Hampshire state regulations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false EPA-approved new Hampshire state... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1525 EPA-approved new Hampshire state regulations. The following table identifies that State regulations...

  11. 40 CFR 52.1525 - EPA-approved new Hampshire state regulations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false EPA-approved new Hampshire state... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1525 EPA-approved new Hampshire state regulations. The following table identifies that State regulations...

  12. 40 CFR 52.1525 - EPA-approved new Hampshire state regulations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false EPA-approved new Hampshire state... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1525 EPA-approved new Hampshire state regulations. The following table identifies that State regulations...

  13. 40 CFR 52.1525 - EPA-approved new Hampshire state regulations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false EPA-approved new Hampshire state... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1525 EPA-approved new Hampshire state regulations. The following table identifies that State regulations...

  14. 25 CFR 286.16 - Grant approval authority.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Grant approval authority. 286.16 Section 286.16 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ECONOMIC ENTERPRISES INDIAN BUSINESS DEVELOPMENT PROGRAM § 286.16 Grant approval authority. Applications for grants require approval by the Assistant...

  15. 7 CFR 1710.206 - Approval requirements for load forecasts prepared pursuant to approved load forecast work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... narrative shall address the overall approach, time periods, and expected internal and external uses of the forecast. Examples of internal uses include providing information for developing or monitoring demand side... suppliers. Examples of external uses include meeting state and Federal regulatory requirements, obtaining...

  16. 76 FR 11779 - Notice of Public Information Collection(s) Approved by the Office of Management and Budget

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ... FEDERAL COMMUNICATIONS COMMISSION Notice of Public Information Collection(s) Approved by the Office of Management and Budget February 23, 2011. SUMMARY: The Federal Communications Commission has... information contained under OMB control number 3060-1144 is necessary to prepare one of the Commission's media...

  17. 24 CFR 990.315 - Submission and approval of operating budgets.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... operating budgets. 990.315 Section 990.315 Housing and Urban Development Regulations Relating to Housing and..., Monitoring, and Reporting § 990.315 Submission and approval of operating budgets. (a) Required documentation: (1) Prior to the beginning of its fiscal year, a PHA shall prepare an operating budget in a manner...

  18. 77 FR 2267 - Notice of Intent To Extend a Currently Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ...: 05/31/2012. Type of Request: Extension of a currently approved information collection for three years... preparing a review they do not have a conflict-of-interest with a particular application and will maintain... applications and reviews but also panel discussions. On the Conflict-of-Interest and Confidentiality...

  19. OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE - A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gordon Tibbitts; Arnis Judzis

    2001-04-01

    This document details the progress to date on the OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE -- A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING contract for the quarter starting January 2001 through March 2001. Accomplishments to date include the following: (1) On January 9th of 2001, details of the Mud Hammer Drilling Performance Testing Project were presented at a ''kick-off'' meeting held in Morgantown. (2) A preliminary test program was formulated and prepared for presentation at a meeting of the advisory board in Houston on the 8th of February. (3) The meeting was held with the advisorymore » board reviewing the test program in detail. (4) Consensus was achieved and the approved test program was initiated after thorough discussion. (5) This new program outlined the details of the drilling tests as well as scheduling the test program for the weeks of 14th and 21st of May 2001. (6) All the tasks were initiated for a completion to coincide with the test schedule. (7) By the end of March the hardware had been designed and the majority was either being fabricated or completed. (8) The rock was received and cored into cylinders.« less

  20. PM-1 NUCLEAR POWER PLANT PROGRAM. Quarterly Progress Report No. 2 for June 1 to August 31, 1959

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sieg, J.S.; Smith, E.H.

    1959-10-01

    The objective of the contract is the design, development, fabrication, installation, and initial testing and operation of a prepackaged air- transportable pressurized water reactor nuclear power plant, the PM-1. The specified output is 1 Mwe and 7 million Btu/hr of heat. The plant is to be operational by March 1962. The principal efforts were completion of the plant parametric study and preparation of the preliminary design. A summary of design parameters is given. Systems development work included study and selection of packages for full-scale testing, a survey of in-core instrumentation techniques, control and instrumentation development, and development of components formore » the steam generator, condenser, and turbine generator, which are not commercially available. Reactor development work included completion of the parametric zeropower experiments and preparrtions for a flexible zeropower test program, a revision of plans for irradiation testing PM-1 fuel elements, initiation of a reactor flow test program, outliring of a heat tnansfer test program, completion of the seven-tube test section (SETCH-1) tests, and evaluation of control rod actuators leading to specification of a magnetic jack-type control rod drive similar to that reported in ANL-5768. Completion of the prelimirary design led to initiation of the final design effort, which will be the principal activity during the next two project quarters. Preparations for core fabrication included procurement of core cladding material for the zero-power teat core, arrangement with a subcontractor to convent UF/sub 6/ to UO/sub 2/ and to commence delivery of the oxide during the next quarter, development of fuel element fabrication and ultrasonic testing techniques, study of control rod materials, UO/sub 2/ recovery techniques, and boron analysis methods. Preliminary work on site preparation was pursued with receipt of USAEC approval for a location on the eastern slope of Warren Peak at Sundance, Wyoming. A survey of this site is underway. A preliminary Hazards Summary Report is in preparation. (For preceding period see MND-M-1812.) (auth)« less

  1. 76 FR 58303 - Regular Board of Directors Meeting; Sunshine Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ..., Washington, DC 20005. STATUS: Open. CONTACT PERSON FOR MORE INFORMATION: Erica Hall, Assistant Corporate... Directors Minutes III. Approval of the Special Board of Directors Minutes IV. Approval of the Corporate Administration Committee Minutes V. Approval of the Finance, Budget and Program Committee Minutes VI. Approval of...

  2. 7 CFR 802.1 - Qualified laboratories.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... certification program having auditing capability is automatically approved by the Service. (2) Any county or... calibration is approved by the Service. The State approval may be documented by a certificate or letter. The.... (Approved by the Office of Management and Budget under control number 0580-0011) [51 FR 7052, Feb. 28, 1986...

  3. 49 CFR 22.43 - Approval or denial.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Approval or denial. 22.43 Section 22.43 Transportation Office of the Secretary of Transportation SHORT-TERM LENDING PROGRAM (STLP) Loan Application Process § 22.43 Approval or denial. If a loan guarantee is approved by DOT OSDBU, a Guarantee Agreement...

  4. 75 FR 56663 - Agency Information Collection (Quarterly Report of State Approving Agency Activities); Activity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ... INFORMATION CONTACT: Denise McLamb, Enterprise Records Service (005R1B), Department of Veterans Affairs, 810... a currently approved collection. Abstract: VA reimburses State Approving Agencies (SAAs) for expenses incurred in the approval and supervision of education and training programs. SAAs are required to...

  5. 6 CFR 27.240 - Review and approval of security vulnerability assessments.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.240 Review and approval of security vulnerability assessments. (a) Review and Approval. The Department will review and... 6 Domestic Security 1 2014-01-01 2014-01-01 false Review and approval of security vulnerability...

  6. 6 CFR 27.240 - Review and approval of security vulnerability assessments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.240 Review and approval of security vulnerability assessments. (a) Review and Approval. The Department will review and... 6 Domestic Security 1 2011-01-01 2011-01-01 false Review and approval of security vulnerability...

  7. 6 CFR 27.240 - Review and approval of security vulnerability assessments.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.240 Review and approval of security vulnerability assessments. (a) Review and Approval. The Department will review and... 6 Domestic Security 1 2013-01-01 2013-01-01 false Review and approval of security vulnerability...

  8. 6 CFR 27.240 - Review and approval of security vulnerability assessments.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.240 Review and approval of security vulnerability assessments. (a) Review and Approval. The Department will review and... 6 Domestic Security 1 2012-01-01 2012-01-01 false Review and approval of security vulnerability...

  9. 49 CFR 1522.109 - TSA review and approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY SECURITY RULES FOR ALL MODES OF TRANSPORTATION TSA-APPROVED VALIDATION FIRMS AND VALIDATORS TSA-Approved Validation Firms and Validators for the Certified Cargo Screening Program... that the applicant is qualified to be a validation firm. (b) Notice.—(1) Approval. If an application is...

  10. Finding of no significant impact: Changes in the sanitary sludge land application program on the Oak Ridge Reservation, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    The U.S. Department of Energy (DOE) has completed an environmental assessment (DOE/EA-1042) that evaluates potential impacts of proposed changes in the sanitary sludge land application program on the DOE Oak Ridge Reservation (ORR), Oak Ridge, Tennessee. Changes in lifetime sludge land application limits and radionuclide loading are proposed, and two new sources of sewage sludge from DOE facilities would be transported to the City of Oak Ridge Publicly Owned Treatment Works (COR POTW). Lifetime sludge land application limits would increase from 22 tons/acre to 50 tons/acre, which is the limit approved and permitted by the Tennessee Department of Environment andmore » Conservation (TDEC). With the approval of TDEC, the permissible radiological dose from sludge land application would change from the current limit of 2x background radionuclide concentrations in receiving soils to a risk-based dose limit of 4 millirem (mrem) per year for the maximally exposed individual. Sludge land application sites would not change from those that are currently part of the program. Based on the results of the analysis reported in the EA, DOE has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement (EIS) is not necessary, and DOE is issuing this Finding of No Significant Impact (FONSI). 70 refs., 2 figs., 17 tabs.« less

  11. 14 CFR 121.915 - Continuing qualification curriculum.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... in all tasks, procedures and subjects required in accordance with the approved program documentation, as follows: (i) For pilots in command, seconds in command, and flight engineers, First Look in accordance with the certificate holder's FAA-approved program documentation. (ii) For pilots in command...

  12. 7 CFR 1956.118 - Approval authority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Approval authority. 1956.118 Section 1956.118 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS...) PROGRAM REGULATIONS (CONTINUED) DEBT SETTLEMENT Debt Settlement-Community and Business Programs § 1956.118...

  13. 40 CFR 86.094-13 - Light-duty exhaust durability programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements. (5) In-use verification. The Standard Self-Approval Durability Program includes no requirement... selection methods, durability data vehicle compliance requirements, in-use verification requirements... Accumulation Carryover. Light-duty Trucks Tier 1 & Tier 0 Standard Self-Approval Carryover. Alternative Service...

  14. Air Permitting Delegations in EPA's New England Region

    EPA Pesticide Factsheets

    All Region 1 states have EPA-approved Title V operating permit programs. In addition, all Region 1 states have either SIP-approved NSR/PSD permitting programs or the state has been delegated as the permitting authority for NSR/PSD permits by EPA.

  15. 30 CFR 916.12 - State regulatory program and proposed program amendment provisions not approved.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... approved. (a) The following provisions of the Kansas Administrative Regulations (K.A.R.) as submitted on April 23, 1986, and January 26, 1988, are disapproved: Paragraphs (c) and (d) of K.A.R. 47-9-1 insofar...

  16. 30 CFR 916.12 - State regulatory program and proposed program amendment provisions not approved.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... approved. (a) The following provisions of the Kansas Administrative Regulations (K.A.R.) as submitted on April 23, 1986, and January 26, 1988, are disapproved: Paragraphs (c) and (d) of K.A.R. 47-9-1 insofar...

  17. 9 CFR 161.5 - Specialization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... completion of an orientation or training program approved by APHIS. For certain accredited specializations, the cost of orientation or training may be borne by the accredited veterinarian. An accredited... completion of an additional orientation or training program approved by APHIS that focuses on the specific...

  18. 75 FR 66167 - Agency Information Collection Activities: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ...) establishing the Experimental Program to Stimulate Competitive Research (EPSCoR) and the general guidelines for... (including Federal holidays). SUPPLEMENTARY INFORMATION: Title: Experimental Program to Stimulate Competitive Research (EPSCoR) Outcomes Survey. OMB Approval Number: 3145-NEW. Expiration Date of Approval: Not...

  19. 78 FR 59704 - Medicare, Medicaid, and CLIA Programs; Clinical Laboratory Improvement Amendments of 1988...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... Secretary of the Department of Health and Human Services (HHS). Under section 1861(s) of the Social Security... under its approved state licensure program within 10 days of a withdrawal of our approval of the state's...

  20. [Comparison and review on specifications of fermented Cordyceps sinensis products].

    PubMed

    Yang, Ping; Zhao, Xiao-Xia; Zhang, Yong-Wen

    2018-02-01

    There are five kinds of fermented Cordyceps crude drug and their preparations that have been approved as medicine on the market. Since the initial strains of the crude drug were all isolated from natural Cordyceps sinensis, they have similar names, chemical components and even clinical applications. However, because of the different strain species and fermentation processes, there was significant difference in quality. As a result, they should be clearly distinguished in clinical use. Most of the products were researched and developed during the 1980s and 1990s, so there was difference in quality standards for different products, and their quality control levels of some products were not perfect. At present, some of the products are approved as Chinese medicine, others are approved as chemical drugs, with a confusion in products name, management and clinical application. In this paper, the approval numbers, quality standards and clinical applications, and current problems of these products were summarized and compared; some suggestions were put forward, such as standardizing the product name, unifying the management of approval number category, and increasing the specific quality control attributes, in order to provide reference for standard implementation, quality control and drug regulation for fermented Cordyceps crude drugs and their preparations. Copyright© by the Chinese Pharmaceutical Association.

Top