The test-preparation program in this guide covers all forms of test taking to help students deal with real-world problems like test anxiety and insufficient preparation time. The chapters are: (1) "Finding Out about the Tests You Must Take"; (2) "Making a Study Plan"; (3) "Carrying Out Your Study Plan"; (4) "Learning Strategies"; (5) "Coping with…
PREPARE: guidelines for planning animal research and testing
Smith, Adrian J; Clutton, R Eddie; Lilley, Elliot; Hansen, Kristine E Aa; Brattelid, Trond
2017-01-01
There is widespread concern about the quality, reproducibility and translatability of studies involving research animals. Although there are a number of reporting guidelines available, there is very little overarching guidance on how to plan animal experiments, despite the fact that this is the logical place to start ensuring quality. In this paper we present the PREPARE guidelines: Planning Research and Experimental Procedures on Animals: Recommendations for Excellence. PREPARE covers the three broad areas which determine the quality of the preparation for animal studies: formulation, dialogue between scientists and the animal facility, and quality control of the various components in the study. Some topics overlap and the PREPARE checklist should be adapted to suit specific needs, for example in field research. Advice on use of the checklist is available on the Norecopa website, with links to guidelines for animal research and testing, at https://norecopa.no/PREPARE. PMID:28771074
PREPARE: guidelines for planning animal research and testing.
Smith, Adrian J; Clutton, R Eddie; Lilley, Elliot; Hansen, Kristine E Aa; Brattelid, Trond
2018-04-01
There is widespread concern about the quality, reproducibility and translatability of studies involving research animals. Although there are a number of reporting guidelines available, there is very little overarching guidance on how to plan animal experiments, despite the fact that this is the logical place to start ensuring quality. In this paper we present the PREPARE guidelines: Planning Research and Experimental Procedures on Animals: Recommendations for Excellence. PREPARE covers the three broad areas which determine the quality of the preparation for animal studies: formulation, dialogue between scientists and the animal facility, and quality control of the various components in the study. Some topics overlap and the PREPARE checklist should be adapted to suit specific needs, for example in field research. Advice on use of the checklist is available on the Norecopa website, with links to guidelines for animal research and testing, at https://norecopa.no/PREPARE .
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haas, J.C.; Olivo, C.A.; Wilson, K.B.
1994-04-01
An experimental test plan has been prepared for DOE/METC review and approval to develop a filter media suitable for multi-contaminant control in granular-bed filter (GBF) applications. The plan includes identification, development, and demonstration of methods for enhanced media morphology, chemical reactivity, and mechanical strength. The test plan includes media preparation methods, physical and chemical characterization methods for fresh and reacted media, media evaluation criteria, details of test and analytical equipment, and test matrix of the proposed media testing. A filter media composed of agglomerated limestone and clay was determined to be the best candidate for multi-contaminate control in GBF operation.more » The combined limestone/clay agglomerate has the potential to remove sulfur and alkali species, in addition to particulate, and possibly halogens and trace heavy metals from coal process streams.« less
9 CFR 147.8 - Procedures for preparing egg yolk samples for diagnostic tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Procedures for preparing egg yolk samples for diagnostic tests. 147.8 Section 147.8 Animals and Animal Products ANIMAL AND PLANT HEALTH... IMPROVEMENT PLAN Blood Testing Procedures § 147.8 Procedures for preparing egg yolk samples for diagnostic...
9 CFR 147.8 - Procedures for preparing egg yolk samples for diagnostic tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Procedures for preparing egg yolk samples for diagnostic tests. 147.8 Section 147.8 Animals and Animal Products ANIMAL AND PLANT HEALTH... IMPROVEMENT PLAN Blood Testing Procedures § 147.8 Procedures for preparing egg yolk samples for diagnostic...
9 CFR 147.8 - Procedures for preparing egg yolk samples for diagnostic tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Procedures for preparing egg yolk samples for diagnostic tests. 147.8 Section 147.8 Animals and Animal Products ANIMAL AND PLANT HEALTH... IMPROVEMENT PLAN Blood Testing Procedures § 147.8 Procedures for preparing egg yolk samples for diagnostic...
9 CFR 147.8 - Procedures for preparing egg yolk samples for diagnostic tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Procedures for preparing egg yolk samples for diagnostic tests. 147.8 Section 147.8 Animals and Animal Products ANIMAL AND PLANT HEALTH... IMPROVEMENT PLAN Blood Testing Procedures § 147.8 Procedures for preparing egg yolk samples for diagnostic...
Final Report for X-ray Diffraction Sample Preparation Method Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ely, T. M.; Meznarich, H. K.; Valero, T.
WRPS-1500790, “X-ray Diffraction Saltcake Sample Preparation Method Development Plan/Procedure,” was originally prepared with the intent of improving the specimen preparation methodology used to generate saltcake specimens suitable for XRD-based solid phase characterization. At the time that this test plan document was originally developed, packed powder in cavity supports with collodion binder was the established XRD specimen preparation method. An alternate specimen preparation method less vulnerable, if not completely invulnerable to preferred orientation effects, was desired as a replacement for the method.
Pilot-scale treatability test plan for the 200-BP-5 operable unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less
Low Temperature Power Coating (LTPC) Phase 2 Laboratory Test Plan and Procedures for PACAF (Rev D)
2018-03-20
Δa*, LTPC Phase II Laboratory Test Plan and Procedures Rev D (CDRL A004) BATTELLE | 20 March 2018 | 6 Δb* and ΔE will be calculated post ...BATTELLE | CONTRACT NUMBER: FA8532-17-C-0008 (CDRL A004) LTPC Phase II Laboratory Test Plan and Procedures (Rev D) Prepared by... Test Plan and Procedures Rev D (CDRL A004) BATTELLE | 20 March 2018 | i List of Acronyms AGE Aircraft Ground Equipment ASTM American
Future aerospace ground test facility requirements for the Arnold Engineering Development Center
NASA Technical Reports Server (NTRS)
Kirchner, Mark E.; Baron, Judson R.; Bogdonoff, Seymour M.; Carter, Donald I.; Couch, Lana M.; Fanning, Arthur E.; Heiser, William H.; Koff, Bernard L.; Melnik, Robert E.; Mercer, Stephen C.
1992-01-01
Arnold Engineering Development Center (AEDC) was conceived at the close of World War II, when major new developments in flight technology were presaged by new aerodynamic and propulsion concepts. During the past 40 years, AEDC has played a significant part in the development of many aerospace systems. The original plans were extended through the years by some additional facilities, particularly in the area of propulsion testing. AEDC now has undertaken development of a master plan in an attempt to project requirements and to plan for ground test and computational facilities over the coming 20 to 30 years. This report was prepared in response to an AEDC request that the National Research Council (NRC) assemble a committee to prepare guidance for planning and modernizing AEDC facilities for the development and testing of future classes of aerospace systems as envisaged by the U.S. Air Force.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chu, C.I.C.; Gillespie, B.L.
One of the most perplexing problems facing the coal industry is how to properly dispose of the waste and/or even recovery a small fraction of the Btu value of the waste, while minimizing the environmental concerns. UCC Research considers this monumental environmental problems as an opportunity to recovery useable organic materials and reduce the environmental problems created by coal waste. Mild gasification is the method used by UCC Research to realize these objectives. Coal feedstocks are fed into the mild gasification system yielding liquids, char, and gases for commercial application. The program consists of seven tasks: Task 1, Characterize Managementmore » of Coal Preparation Wastes; Task 2, Review Design Specifications and Prepare Preliminary Test Plan; Task 3, Select and Characterize Test Feedstocks; Task 4, Acquire/Construct Process Elements; Task 5, Prepare Final Test Plan; Task 6, Implement Final Test Plan; Task 7, Analyze Test Results and Assess System Economics. A schedule of the program is given. The program was initiated on September 30, 1984. Tasks 1, 2, 3, 4, 5, and 6 have been completed. Work is continuing on Task 7.« less
Process test plan, phase II: waste retrieval sluicing system emissions collection
DOE Office of Scientific and Technical Information (OSTI.GOV)
POWERS, R.L.
1999-06-01
This Process Test Plan is prepared to continue from HNF-3733 which was Phase I of the test. Supplemental operational controls and sampling requirements are defined to safely obtain gas samples from the 296-C-006 ventilation system stack during active operation of the sluicing equipment.
9 CFR 147.8 - Procedures for preparing egg yolk samples for diagnostic tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Procedures for preparing egg yolk... IMPROVEMENT PLAN Blood Testing Procedures § 147.8 Procedures for preparing egg yolk samples for diagnostic... chapter. (a) Under the supervision of an Authorized Agent or State Inspector, the eggs which are used in...
Chemical, Biological, and Radiological Contamination Survivability: Material Effects Testing
2012-06-22
form that can be compared to pretest and posttest functional performance data. If Soldiers are desired, ensure a Test Schedule and Review Committee...test execution. f. The material’s performance specification should also be reviewed before planning test execution. For example , the...test data, and conformance with specified test and operating procedures cannot be overemphasized. 3.1 Test Planning. 3.1.1 Pretest Preparation
Apollo Soyuz mission planning and operations
NASA Technical Reports Server (NTRS)
Frank, M. P., III
1976-01-01
The paper describes the Apollo Soyuz project from the points of view of working group organization, mission plan definition, joint operations concept, and mission preparation. The concept for joint operations considered contingency situations as well as nominal operations. Preparations for the joint flight included cooperative tracking tests and combined training of the flight crews and mission control personnel.
A cognitive behavioral course for at-risk senior nursing students preparing to take the NCLEX.
Poorman, Susan G; Mastorovich, Melissa L; Liberto, Terri L; Gerwick, Michele
2010-01-01
For some nursing students, the stress of preparing for and taking the NCLEX can lead to maladaptive behaviors such as poor test performance and inadequate preparation. A different approach to NCLEX preparation for at-risk seniors is described. A 3-credit course that combines cognitive behavioral techniques, metacognitive strategies, test-taking strategies, and simulated NCLEX experience with practice questions is presented. Students also develop an individualized plan of preparation from graduation until they take the NCLEX.
30 CFR 282.28 - Environmental protection measures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Section 282.28 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT... prepared in association with the review and evaluation of the approved Delineation, Testing, or Mining Plan... of a proposed Delineation, Testing, or Mining Plan, the Director may require the lessee to collect...
IDC Re-Engineering Phase 3 Development Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harris, James M.; Burns, John F.; Pollock, David L.
2017-01-01
Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Duncan, J.B.
1997-01-07
This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Single Shell Tank Saltcake from tanks 24 t -BY- I 10, 24 1 -U- 108, 24 1 -U- 109, 24 1 -A- I 0 1, and 24 t - S-102, in a bench-scale column. The cesium sorbent to be tested is crystalline siticotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-024, Hanford Single Shell Tank Saltcake Cesium Removal Test Plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; HUBER HJ
2011-06-08
This report documents the preparation of three actual Hanford tank waste samples for shipment to the Savannah River National Laboratory (SRNL). Two of the samples were dissolved saltcakes from tank 241-AN-103 (hereafter AN-103) and tank 241-SX-105 (hereafter SX-105); one sample was a supernate composite from tanks 241-AZ-101 and 241-AZ-102 (hereafter AZ-101/102). The preparation of the samples was executed following the test plans LAB-PLAN-10-00006, Test Plan for the Preparation of Samples from Hanford Tanks 241-SX-105, 241-AN-103, 241-AN-107, and LAB-PLN-10-00014, Test Plan for the Preparation of a Composite Sample from Hanford Tanks 241-AZ-101 and 241-AZ-102 for Steam Reformer Testing at the Savannahmore » River National Laboratory. All procedural steps were recorded in laboratory notebook HNF-N-274 3. Sample breakdown diagrams for AN-103 and SX-105 are presented in Appendix A. The tank samples were prepared in support of a series of treatability studies of the Fluidized Bed Steam Reforming (FBSR) process using a Bench-Scale Reformer (BSR) at SRNL. Tests with simulants have shown that the FBSR mineralized waste form is comparable to low-activity waste glass with respect to environmental durability (WSRC-STI-2008-00268, Mineralization of Radioactive Wastes by Fluidized Bed Steam Reforming (FBSR): Comparisons to Vitreous Waste Forms and Pertinent Durability Testing). However, a rigorous assessment requires long-term performance data from FB SR product formed from actual Hanford tank waste. Washington River Protection Solutions, LLC (WRPS) has initiated a Waste Form Qualification Program (WP-S.2.1-20 1 0-00 1, Fluidized Bed Steam Reformer Low-level Waste Form Qualification) to gather the data required to demonstrate that an adequate FBSR mineralized waste form can be produced. The documentation of the selection process of the three tank samples has been separately reported in RPP-48824, 'Sample Selection Process for Bench-Scale Steam Reforming Treatability Studies Using Hanford Waste Samples.'« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; HUBER HJ
2011-04-21
This report documents the preparation of three actual Hanford tank waste samples for shipment to the Savannah River National Laboratory (SRNL). Two of the samples were dissolved saltcakes from tank 241-AN-103 (hereafter AN-103) and tank 241-SX-105 (hereafter SX-105); one sample was a supernate composite from tanks 241-AZ-101 and 241-AZ-102 (hereafter AZ-101/102). The preparation of the samples was executed following the test plans LAB-PLAN-10-00006, Test Plan for the Preparation of Samples from Hanford Tanks 241-SX-105, 241-AN-103, 241-AN-107, and LAB-PLN-l0-00014, Test Plan for the Preparation of a Composite Sample from Hanford Tanks 241-AZ-101 and 241-AZ-102 for Steam Reformer Testing at the Savannahmore » River National Laboratory. All procedural steps were recorded in laboratory notebook HNF-N-274 3. Sample breakdown diagrams for AN-103 and SX-105 are presented in Appendix A. The tank samples were prepared in support of a series of treatability studies of the Fluidized Bed Steam Reforming (FBSR) process using a Bench-Scale Reformer (BSR) at SRNL. Tests with simulants have shown that the FBSR mineralized waste form is comparable to low-activity waste glass with respect to environmental durability (WSRC-STI-2008-00268, Mineralization of Radioactive Wastes by Fluidized Bed Steam Reforming (FBSR): Comparisons to Vitreous Waste Forms and Pertinent Durability Testing). However, a rigorous assessment requires long-term performance data from FBSR product formed from actual Hanford tank waste. Washington River Protection Solutions, LLC (WRPS) has initiated a Waste Form Qualification Program (WP-5.2.1-2010-001, Fluidized Bed Steam Reformer Low-level Waste Form Qualification) to gather the data required to demonstrate that an adequate FBSR mineralized waste form can be produced. The documentation of the selection process of the three tank samples has been separately reported in RPP-48824, Sample Selection Process for Bench-Scale Steam Reforming Treatability Studies Using Hanford Waste Samples.« less
ERIC Educational Resources Information Center
Berney, Mary F.
Plans for the field-testing and implementation of the Accreditation Plus Model (APM) for evaluation of teacher preparation programs are described. Field-testing is taking place in the Center for Teacher Education Evaluation at Tennessee Technological University (Cookeville). The APM is based on the professional judgment approach to program…
Flight assessment of a large supersonic drone aircraft for research use
NASA Technical Reports Server (NTRS)
Eckstrom, C. V.; Peele, E. L.
1974-01-01
An assessment is made of the capabilities of the BQM-34E supersonic drone aircraft as a test bed research vehicle. This assessment is made based on a flight conducted for the purpose of obtaining flight test measurements of wing loads at various maneuver flight conditions. Flight plan preparation, flight simulation, and conduct of the flight test are discussed along with a presentation of the test data obtained and an evaluation of how closely the flight test followed the test plan.
South Florida freight advanced traveler information system.
DOT National Transportation Integrated Search
2013-10-01
This Demonstration Plan has been prepared to provide guidance and a common definition to all parties of the testing program that will be conducted for the South Florida FRATIS Demonstration Project. More specifically, this document provides: Plan...
In situ gas treatment technology demonstration test plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thornton, E.C.; Miller, R.D.
1996-02-16
This document defines the objectives and requirements associated with undertaking a field demonstration of an in situ gas treatment appoach to remediation chromate-contaminated soil. The major tasks presented in this plan include the design and development of the surface gas treatment system, performance of permitting activities, and completion of site preparation and field testing activities.
Atay, Selma; Karabacak, Ukke
2012-06-01
It is expected that nursing education improves abilities of students in solving problems, decision making and critical thinking in different circumstances. This study was performed to analyse the effects of care plans prepared using concept maps on the critical thinking dispositions of students. An experimental group and a control group were made up of a total of 80 freshman and sophomore students from the nursing department of a health school. The study used a pre-test post-test control group design. The critical thinking dispositions of the groups were measured using the California Critical Thinking Disposition Inventory. In addition, the care plans prepared by the experimental group students were evaluated using the criteria for evaluating care plans with concept maps. T-test was used in analysing the data. The results showed that there were no statistically significant differences in the total and sub-scale pre-test scores between the experimental group and control group students. There were also significant differences in the total and sub-scale post-test scores between the experimental group and control group students. There were significant differences between concept map care plan evaluation criteria mean scores of the experimental students. In the light of these findings, it could be argued that the concept mapping strategy improves critical thinking skills of students. © 2012 Blackwell Publishing Asia Pty Ltd.
Long-range planning cost model for support of future space missions by the deep space network
NASA Technical Reports Server (NTRS)
Sherif, J. S.; Remer, D. S.; Buchanan, H. R.
1990-01-01
A simple model is suggested to do long-range planning cost estimates for Deep Space Network (DSP) support of future space missions. The model estimates total DSN preparation costs and the annual distribution of these costs for long-range budgetary planning. The cost model is based on actual DSN preparation costs from four space missions: Galileo, Voyager (Uranus), Voyager (Neptune), and Magellan. The model was tested against the four projects and gave cost estimates that range from 18 percent above the actual total preparation costs of the projects to 25 percent below. The model was also compared to two other independent projects: Viking and Mariner Jupiter/Saturn (MJS later became Voyager). The model gave cost estimates that range from 2 percent (for Viking) to 10 percent (for MJS) below the actual total preparation costs of these missions.
Test plan for performance testing of the Eaton AC-3 electric vehicle
NASA Astrophysics Data System (ADS)
Crumley, R.; Heiselmann, H. W.
1985-04-01
An alternating current (ac) propulsion system for an electric vehicle was developed and tested. The test bed vehicle is a modified 1981 Mercury Lynx. The test plan was prepared specifically for the third modification to this test bed and identified as the Eaton AC-3. The scope of the testing done on the Eaton AC-3 includes coastdown and dynamometer tests but does not include environmental, on-road, or track testing. Coastdown testing is performed in accordance with SAE J-1263 (SAE Recommended Practice for Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques).
ERIC Educational Resources Information Center
Tennessee State Board for Vocational Education, Murfreesboro. Vocational Curriculum Lab.
PRACTICAL NURSE INSTRUCTORS, IN CONFERENCE, COMPILED THIS INDIVIDUALLY PLANNED AND TESTED MATERIAL TO BE USED IN PRACTICAL NURSE EDUCATION. THIRTY-TWO LESSON PLANS ON THE SUBJECT OF MOTHER AND INFANT CARE COVER TOPICS RANGING FROM THE REPRODUCTIVE SYSTEM TO COMPLICATIONS INVOLVING THE NEWBORN. EACH PLAN INCLUDES AIM, REFERENCES, MATERIALS,…
NASA Technical Reports Server (NTRS)
Lewis, Pattie
2007-01-01
Headquarters National Aeronautics and Space Administration (NASA) chartered the NASA Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objectives of the AP2 Office are to: (1) Reduce or eliminate the use of hazardous materials or hazardous processes at manufacturing, remanufacturing, and sustainment locations. (2) Avoid duplication of effort in actions required to reduce or eliminate hazardous materials through joint center cooperation and technology sharing. The objective of this project was to qualify candidate alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel applications at NASA facilities. This project compares the surface preparation/depainting performance of the proposed alternatives to existing surface preparation/depainting systems or standards. This Joint Test Report (JTR) contains the results of testing as per the outlines of the Joint Test Protocol (JTP), Joint Test Protocol for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel, and the Field Test Plan (FTP), Field Evaluations Test Plan for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel, for critical requirements and tests necessary to qualify alternatives for coating removal systems. These tests were derived from engineering, performance, and operational impact (supportability) requirements defined by a consensus of government and industry participants. This JTR documents the results of the testing as well as any test modifications made during the execution of the project. This JTR is made available as a reference for future pollution prevention endeavors by other NASA Centers, the Department of Defense and commercial users to minimize duplication of effort. The current coating removal processes identified herein are for polyurethane, epoxy and other paint systems applied by conventional wet-spray processes. A table summarizes the target hazardous materials, processes and materials, applications, affected programs, and candidate substrates.
NASA Technical Reports Server (NTRS)
1973-01-01
Two orbital test plans were prepared to verify one of the passive cryogenic storage tank/feedline candidate designs. One plan considered the orbital test article to be launched as a dedicated payload using an Atlas F burner launching configuration. The second plan proposed to launch the orbital test article as a secondary payload on the Titan E/Centaur proof flight. The secondary payload concept was pursued until January 1973, when work to build the hardware for this phase of the contract was terminated for lack of a sponsor for the flight. The dedicated payload launched on an Atlas F is described.
Are nurses prepared for retirement?
Blakeley, Judith; Ribeiro, Violeta
2008-09-01
This study explored various factors and income sources that registered nurses believe are important in retirement planning. In many countries worldwide, many registered nurses are approaching retirement age. This raises concerns related to the level of preparedness of retiring nurses. A mail-out questionnaire was sent to 200 randomly selected nurses aged 45 and older. SPSS descriptors were used to outline the data. Multiple t-tests were conducted to test for significant differences between selected responses by staff nurses and a group of nurse managers, educators and researchers. Of 124 respondents, 71% planned to retire by age 60. Only 24% had done a large amount of planning. The top four planning strategies identified were related to keeping healthy and active, both physically and mentally; a major financial planning strategy ranked fifth. Work pensions, a government pension and a personal savings plan were ranked as the top three retirement income sources. No significant differences were found between the staff nurse and manager groups on any of the items. IMPLICATIONS FOR NURSING MANAGERS/CONCLUSIONS: The results of this study suggest that managers' preparation for retirement is no different from that of staff nurses. All nurses may need to focus more on financial preparation, and begin the process early in their careers if they are to have a comfortable and healthy retirement. Nurse managers are in a position to advocate with senior management for early and comprehensive pre-retirement education for all nurses and to promote educational sessions among their staff. Managers may find the content of this paper helpful as they work with nurses to help them better prepare for retirement. This exploratory study adds to the limited amount of research available on the topic.
Career Preparation: A Longitudinal, Process-Oriented Examination
Stringer, Kate; Kerpelman, Jennifer; Skorikov, Vladimir
2011-01-01
Preparing for an adult career through careful planning, choosing a career, and gaining confidence to achieve career goals is a primary task during adolescence and early adulthood. The current study bridged identity process literature and career construction theory (Savickas, 2005) by examining the commitment component of career adaptability, career preparation (i.e., career planning, career decision-making, and career confidence), from an identity process perspective (Luyckx, Goossens, & Soenens, 2006). Research has suggested that career preparation dimensions are interrelated during adolescence and early adulthood; however, what remains to be known is how each dimension changes over time and the interrelationships among the dimensions during the transition from high school. Drawing parallels between career preparation and identity development dimensions, the current study addressed these questions by examining the patterns of change in each career preparation dimension and parallel process models that tested associations among the slopes and intercepts of the career preparation dimensions. Results showed that the career preparation dimensions were not developing similarly over time, although each dimension was associated cross-sectionally and longitudinally with the other dimensions. Results also suggested that career planning and decision-making precede career confidence. The results of the current study supported career construction theory and showed similarities between the processes of career preparation and identity development. PMID:21804641
Career Preparation: A Longitudinal, Process-Oriented Examination.
Stringer, Kate; Kerpelman, Jennifer; Skorikov, Vladimir
2011-08-01
Preparing for an adult career through careful planning, choosing a career, and gaining confidence to achieve career goals is a primary task during adolescence and early adulthood. The current study bridged identity process literature and career construction theory (Savickas, 2005) by examining the commitment component of career adaptability, career preparation (i.e., career planning, career decision-making, and career confidence), from an identity process perspective (Luyckx, Goossens, & Soenens, 2006). Research has suggested that career preparation dimensions are interrelated during adolescence and early adulthood; however, what remains to be known is how each dimension changes over time and the interrelationships among the dimensions during the transition from high school. Drawing parallels between career preparation and identity development dimensions, the current study addressed these questions by examining the patterns of change in each career preparation dimension and parallel process models that tested associations among the slopes and intercepts of the career preparation dimensions. Results showed that the career preparation dimensions were not developing similarly over time, although each dimension was associated cross-sectionally and longitudinally with the other dimensions. Results also suggested that career planning and decision-making precede career confidence. The results of the current study supported career construction theory and showed similarities between the processes of career preparation and identity development.
40 CFR 51.371 - On-road testing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 2 2010-07-01 2010-07-01 false On-road testing. 51.371 Section 51.371... PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Inspection/Maintenance Program Requirements § 51.371 On-road testing. On-road testing is defined as testing of vehicles for conditions impacting the...
Nationwide Chains May Shake Up Admissions-Counseling Industry.
ERIC Educational Resources Information Center
Gose, Ben
1999-01-01
For-profit college-admissions counseling and college-preparation companies are expanding, and existing test-preparation centers are planning to begin offering admissions-counseling services. One company envisions a national chain. Some educators welcome the trend, while others feel the commercial enterprises may take an inappropriate approach to…
Construction and Analysis of Classroom Tests.
ERIC Educational Resources Information Center
Izard, J. F.
This material provides a discussion of the construction and analysis of tests prepared for classroom use by teachers. The initial discussion is concerned with the purposes of evaluation and the specification of objectives. This is followed by an examination of theoretical and practical considerations in planning a test. The material on test item…
The General Mission Analysis Tool (GMAT) System Test Plan
NASA Technical Reports Server (NTRS)
Conway, Darrel J.; Hughes, Steven P.
2007-01-01
This document serves as the System Test Approach for the GMAT Project. Preparation for system testing consists of three major stages: 1) The Test Approach sets the scope of system testing, the overall strategy to be adopted, the activities to be completed, the general resources required and the methods and processes to be used to test the release. It also details the activities, dependencies and effort required to conduct the System Test. 2) Test Planning details the activities, dependencies and effort required to conduct the System Test. 3) Test Cases documents the tests to be applied, the data to be processed, the automated testing coverage and the expected results. This document covers the first two of these items, and established the framework used for the GMAT test case development. The test cases themselves exist as separate components, and are managed outside of and concurrently with this System Test Plan.
Teacher Testing: I'm O.K., You're O.K., But Somebody's Not!
ERIC Educational Resources Information Center
Martin, Dawn Vincent
Concern about the preparation and competence of teachers has brought about a rapid spread of teacher competency assessment programs. Currently, 36 states test or plan to test teachers prior to certification. Two states, Arkansas and Texas, are already involved with testing teachers in service. Teacher competency testing has become embroiled in…
Shuttle environmental and thermal control/life support system computer program, supplement 1
NASA Technical Reports Server (NTRS)
Ayotte, W. J.
1975-01-01
The computer programs developed to simulate the RSECS (Representative Shuttle Environmental Control System) were described. These programs were prepared to provide pretest predictions, post-test analysis and real time problem analysis for RSECS test planning and evaluation.
40 CFR 1065.410 - Maintenance limits for stabilized test engines.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Engine Selection, Preparation, and Maintenance § 1065... scheduled maintenance on emission data engines must be representative of what is planned to be available to... no longer use it as an emission-data engine. Also, if your test engine has a major mechanical failure...
40 CFR 1065.410 - Maintenance limits for stabilized test engines.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Engine Selection, Preparation, and Maintenance § 1065... scheduled maintenance on emission data engines must be representative of what is planned to be available to... no longer use it as an emission-data engine. Also, if your test engine has a major mechanical failure...
40 CFR 1066.810 - Vehicle preparation.
Code of Federal Regulations, 2014 CFR
2014-07-01
...), prepare the fuel tank for measuring temperature and pressure as specified in 40 CFR 86.107-98(e) and (f) and 40 CFR 86.134. Vapor temperature measurement is optional during the running loss test. (d) For... notify us in advance if you plan to perform such preconditioning. This notice must include a detailed...
Development and Test Plans for the MSR EEV
NASA Technical Reports Server (NTRS)
Dillman, Robert; Laub, Bernard; Kellas, Sotiris; Schoenenberger, Mark
2005-01-01
The goal of the proposed Mars Sample Return mission is to bring samples from the surface of Mars back to Earth for thorough examination and analysis. The Earth Entry Vehicle is the passive entry body designed to protect the sample container from entry heating and deceleration loads during descent through the Earth s atmosphere to a recoverable location on the surface. This paper summarizes the entry vehicle design and outlines the subsystem development and testing currently planned in preparation for an entry vehicle flight test in 2010 and mission launch in 2013. Planned efforts are discussed for the areas of the thermal protection system, vehicle trajectory, aerodynamics and aerothermodynamics, impact energy absorption, structure and mechanisms, and the entry vehicle flight test.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Waste Injection Wells § 146.71 Closure. (a) Closure Plan. The owner or operator of a Class I hazardous waste injection well shall prepare, maintain, and comply with a plan for closure of the well that meets... of material to be used in plugging; (iv) The method of placement of the plugs; (v) Any proposed test...
ERIC Educational Resources Information Center
Brown, Irving A.; Davis, Trina J.; Kulm, Gerald
2011-01-01
This article presents our plans and initial work to explore how mathematics teacher education programs can prepare teachers for diverse middle grades classrooms. It describes the start-up of a five-year National Science Foundation project to design, develop, and test technology-enriched teacher preparation strategies to address equity in algebra…
The Impact of Vocabulary Preparation on L2 Listening Comprehension, Confidence and Strategy Use
ERIC Educational Resources Information Center
Chang, Anna Ching-Shyang
2007-01-01
Building on previous studies of the effects of planning on second language learners' (L2) oral narratives and writing, this research reports an investigation of the effects of vocabulary preparation prior to a listening comprehension test on L2 learners' vocabulary performance, listening comprehension, confidence levels and strategy use. The…
76 FR 77767 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-14
...; post-exposure management and monitoring plans; scrapie test records; application for indemnity payments... authority to promulgate regulations designed to prevent the importation, preparation, sale, or shipment of... applications, product and test report forms and field study summaries. Need and Use of the Information: APHIS...
DOT National Transportation Integrated Search
2017-04-28
The document describes the overall process for evaluating Dedicated Short Range Communication (DSRC) Roadside Units (RSU) against USDOT RSU Specification 4.1 in preparation for field evaluation. The Test Cases contained in this document only evaluate...
14 CFR 61.87 - Solo requirements for student pilots.
Code of Federal Regulations, 2014 CFR
2014-01-01
... flight preparation procedures, including preflight planning and preparation, powerplant operation, and...) Proper flight preparation procedures, including preflight planning and preparation, powerplant operation...) Proper flight preparation procedures, including preflight planning and preparation, powerplant operation...
14 CFR 61.87 - Solo requirements for student pilots.
Code of Federal Regulations, 2010 CFR
2010-01-01
... flight preparation procedures, including preflight planning and preparation, powerplant operation, and...) Proper flight preparation procedures, including preflight planning and preparation, powerplant operation...) Proper flight preparation procedures, including preflight planning and preparation, powerplant operation...
14 CFR 61.87 - Solo requirements for student pilots.
Code of Federal Regulations, 2013 CFR
2013-01-01
... flight preparation procedures, including preflight planning and preparation, powerplant operation, and...) Proper flight preparation procedures, including preflight planning and preparation, powerplant operation...) Proper flight preparation procedures, including preflight planning and preparation, powerplant operation...
14 CFR 61.87 - Solo requirements for student pilots.
Code of Federal Regulations, 2012 CFR
2012-01-01
... flight preparation procedures, including preflight planning and preparation, powerplant operation, and...) Proper flight preparation procedures, including preflight planning and preparation, powerplant operation...) Proper flight preparation procedures, including preflight planning and preparation, powerplant operation...
14 CFR 61.87 - Solo requirements for student pilots.
Code of Federal Regulations, 2011 CFR
2011-01-01
... flight preparation procedures, including preflight planning and preparation, powerplant operation, and...) Proper flight preparation procedures, including preflight planning and preparation, powerplant operation...) Proper flight preparation procedures, including preflight planning and preparation, powerplant operation...
Nutritious Meal Planning; Commercial Cooking and Baking I: 9193.02.
ERIC Educational Resources Information Center
Dade County Public Schools, Miami, FL.
This 90 clock hour course has been prepared as a guide for the tenth grade student in commercial cooking and baking or food management, production and services. It has been divided into six blocks of instruction (menu planning, recipes, condiments and their uses, introduction to cooking, food cost and accounting), and a Quinmester post-test. As a…
NASA Technical Reports Server (NTRS)
Hanley, G. M.
1980-01-01
An evolutionary Satellite Power Systems development plan was prepared. Planning analysis was directed toward the evolution of a scenario that met the stated objectives, was technically possible and economically attractive, and took into account constraining considerations, such as requirements for very large scale end-to-end demonstration in a compressed time frame, the relative cost/technical merits of ground testing versus space testing, and the need for large mass flow capability to low Earth orbit and geosynchronous orbit at reasonable cost per pound.
Site 300 Spill Prevention, Control, and Countermeasures (SPCC) Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Griffin, D.; Mertesdorf, E.
This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67more » of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Griffin, D.
This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67more » of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Geoffrey Wayne
2016-03-16
This document identifies scope and some general procedural steps for performing Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing. This Test Plan describes the requirements, responsibilities, and process for preparing and testing a range of chemical surrogates intended to mimic the energetic response of waste created during processing of legacy nitrate salts. The surrogates developed are expected to bound1 the thermal and mechanical sensitivity of such waste, allowing for the development of process parameters required to minimize the risk to worker and public when processing this waste. Such parameters will be based on the worst-case kinetic parameters as derived frommore » APTAC measurements as well as the development of controls to mitigate sensitivities that may exist due to friction, impact, and spark. This Test Plan will define the scope and technical approach for activities that implement Quality Assurance requirements relevant to formulation and testing.« less
ERIC Educational Resources Information Center
Hopley, Ken; And Others
The first of several planned volumes of Free Response Test Items contains geology questions developed by the Assessment and Evaluation Unit of the New South Wales Department of Education. Two additional geology volumes and biology and chemistry volumes are in preparation. The questions in this volume were written and reviewed by practicing…
NASA Technical Reports Server (NTRS)
Knighton, Donna L.
1992-01-01
A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.
1974-08-01
contributed substantially to the planning of the flight course used in this study and in the preparation of this report. Assistance in business matters has...CONTENTS Page INTRODUCTION 1 METHOD 5 Subjects 5 Equipment Experimental Plan 8 Procedure 14 Performance Assessment 17 Statistical Treatment 19 RESULTS...implementation of RNAV service. These documents provide the basis for future RNAV planning both procedurally and quantitatively. At the heart of the
Servicers system demonstration plan and capability development
NASA Technical Reports Server (NTRS)
Bulboaca, M. A.; Cuseo, J. A.; Derocher, W. L., Jr.; Maples, R. W.; Reynolds, P. C.; Sterrett, R. A.
1985-01-01
A plan for the demonstration of the exchange of Multi-Mission Modular Spacecraft (MMS) modules using the servicer mechanism Engineering Test Unit (ETU) was prepared and executed. The plan included: establishment of requirements, conceptual design, selection of MMS spacecraft mockup configuration, selection of MMS module mockup configuration, evaluation of adequacy of ETU load capability, and selection of a stowage rack arrangement. The MMS module exchange demonstration mockup equipment was designed, fabricated, checked out, shipped, installed, and demonstrated.
ALOS-2 current status and operation plan
NASA Astrophysics Data System (ADS)
Suzuki, Shinichi; Kankaku, Yukihiro; Osawa, Yuji
2013-10-01
The Advanced Land Observing Satellite-2 (ALOS-2) carries the state-of-the-art L-band Synthetic Aperture Radar (SAR) called PALSAR-2 which succeeds to the ALOS / PALSAR. PALSAR-2 will have enhanced performance in both high resolution and wide swath compared to PALSAR. It will allow comprehensive monitoring of disasters. Wider bandwidth and shorter revisit time will give better conference for INSAR data analysis such as crustal deformation and deforestation. The Proto Flight Test (PFT) of ALOS-2 has been conducted since June 2012. In parallel, the PFT of PALSAR-2 has been conducted since March 2012. As of August 2013, ALOS-2 system has completed the interface test with ground system and is preparing for the Vibration test, Acoustic test and Electromagnetic Compatibility test. After completing these tests, ALOS-2 will be transported to JAXA Tanegashima Space Center for launch. The initial commissioning phase of ALOS-2 is planned for six months which are comprised of LEOP (Launch and Early Orbit Phase) and initial Cal/Val phase. During the LEOP, all components will be checked with direct downlink via Xband and with data relay communication via JAXA's DRTS (Data Relay Test Satellite). During the initial Cal/Val phase, the PALSAR-2 data will be verified and calibrated by using Corner Reflectors and Geometric Calibrator at ground. The data acquisition during the commissioning phase will be consistent with the systematic acquisition strategy prepared for the routine operation. This paper describes the current status and operation plan of ALOS-2.
How to Plan Rigorous Instruction. Mastering the Principles of Great Teaching Series
ERIC Educational Resources Information Center
Jackson, Robyn R.
2010-01-01
What if you could go beyond planning and delivering tightly scripted lessons mapped to a standardized test to facilitating rich, robust learning experiences that prepare students to be critical thinkers and lifelong learners? The good news is that you can do it all when you have the steps and strategies from this guide. Drawing from the principles…
ERIC Educational Resources Information Center
Asian Cultural Centre for UNESCO, Tokyo (Japan).
The proceedings of the sixth regional workshop consist of a description of the project and the workshop; a description of the field survey, preparation, and field testing of materials by the group; five papers presented at the workshop; and notes on planned follow-up activities in the participating countries. The workshop culminated a project on…
Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A
2005-01-01
Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.
Mentoring in Medicine Program Encourages Careers in Health | NIH MedlinePlus the Magazine
... healthcare concepts and health career pathways; and College/Post-Baccalaureate—mentoring and strategic planning for school admission, including study skills, test preparation, and internships. MIM ignites an interest in ...
Thin film temperature sensors, phase 3. [for engine-test evaluation
NASA Technical Reports Server (NTRS)
Grant, H. P.; Przybyszewski, J. S.; Claing, R. G.; Anderson, W. L.
1982-01-01
A thin film thermocouple system installation suitable for engine test evaluation was designed, and an engine test plan was prepared. Film adherence, durability, accuracy, and drift characteristics were improved. Film thickness was increased to 14 microns, and drift was reduced to less than 0.02 percent of Fahrenheit temperature per hour on actual turbine blades at 1255 K.
Sudore, Rebecca L; Knight, Sara J; McMahan, Ryan D; Feuz, Mariko; Farrell, David; Miao, Yinghui; Barnes, Deborah E
2014-04-01
We have reconceptualized advance care planning (ACP) as a multistep process focused on preparing patients with skills needed for communication and in-the-moment decision making. To operationalize this paradigm, we created an easy-to-use ACP website (prepareforyourcare.org) based on a theoretical framework of behavior change and pilot-tested its efficacy to engage older adults in ACP. At baseline and 1 week after viewing the PREPARE website, we assessed behavior change in ACP by using a validated survey that includes Process Measures (knowledge, contemplation, self-efficacy, and readiness, 5-point Likert scales) and Action Measures (yes/no whether an ACP behavior was completed). We also assigned participants into behavior change stages (i.e., precontemplation, contemplation, preparation, action, maintenance) and determined the percentage of participants who moved from precontemplation at baseline to higher stages at 1 week. We also assessed PREPARE ease-of-use (10-point scale, 10 being the easiest). Changes were assessed with Wilcoxon signed rank sum tests and McNemar's tests. Mean age of the participants was 68.4 years (SD 6.6), and 65% were nonwhite. Behavior Change Process Measures average Likert scores increased from 3.1 (0.9) to 3.7 (0.7), P < 0.001. Action Measures did not change significantly. However, precontemplation significantly decreased for most actions (e.g., talking to doctor about desired medical care, 61% to 35%, P < 0.003), with a mean decrease of 21% (range, 16%-33%). PREPARE was rated a nine of ten (±1.9) for ease-of-use. A new, patient-centered ACP website that focuses on preparing patients for communication and decision making significantly improves engagement in the process of ACP and behavior change. A clinical trial of PREPARE is currently underway. Published by Elsevier Inc.
ERIC Educational Resources Information Center
Freedman, Marjorie R.; Wood, Helen
2011-01-01
This pilot study developed and tested a tool in a group of multiethnic seniors (n = 24). The tool enabled these older adults to self-assess their stage of change regarding fruit and vegetable intake, and identified those in the preparation stage who were most likely to participate in follow-up action planning classes. (Contains 1 figure.)
Bermea, Autumn M; Khaw, Lyndal; Hardesty, Jennifer L; Rosenbloom, Lindsay; Salerno, Craig
2017-02-01
Although the process of leaving abusive relationships has received increased research attention, preparing to leave is still largely understudied. Despite an emphasis on safety planning, not all women take active steps to prepare, and the characteristics and experiences of those who do or do not actively prepare are unknown. We address this gap with a secondary data analysis of interviews with 25 abused mothers in the process of leaving. All women initially engaged in mental planning, where they had emotionally disconnected from their partners. Using constructivist grounded theory techniques, we identified two distinct groups: those whose mental planning led to active planning ( n = 11), and those who moved directly from mental planning to leaving ( n = 14) with little time or need to actively plan. The groups differed on several individual, relationship, and child factors, which may have impacted the ability or decisions to prepare. This study supports the feminist view that survivors are not helpless victims but active agents who strategize for safety. Those who engage solely in mental planning still prepare to leave, even if they do not engage in active planning. Practitioners should consider factors affecting preparations and acknowledge mental planning as a necessary effort in leaving.
Independent Peer Review of the MOVES Design and Emissions Analysis Plans, and Addendum
Southwest Research Institute (SwRI) prepared this report for a work assignment under the EPA contract “Testing and Analytical Support for Regulation of Motor Vehicles, Engines, Fuels, and Fuel Additives.”
MEDICAL PLANNING FOR DISASTER—Brief Résumé of Accomplishments in California 1950-1959
Stein, Justin J.
1960-01-01
Extensive accumulation and dispersal of medical supplies and equipment has been carried out in this state since 1950. Although such medical supplies and equipment are inadequate for an all out war type disaster their addition to the medical disaster preparedness program represents a great contribution and efforts must be made to continually supplement them. All hospitals must have a disaster plan which is well understood and which must be tested by actual test exercises at least once each year. Preparations for major disasters of all types are costly and time-consuming but represent one of the best possible investments which we can make as insurance against the loss of thousands of casualties. It is the responsibility of each physician to prepare himself and his family in anticipation of being exposed to natural or man-made disasters. PMID:13834118
Dose verification with different ion chambers for SRT/SBRT plans
NASA Astrophysics Data System (ADS)
Durmus, I. F.; Tas, B.; Okumus, A.; Uzel, O. E.
2017-02-01
Verification of patient plan is very important in stereotactic treatments. VMAT plans were prepared with 6MV-FFF or 10MV-FFF energies for 25 intracranial and extracranial stereotactic patients. Absolute dose was measured for dose verification in each plans. Iba® CC01, Iba® CC04, Iba® CC13 ion chambers placed at a depth of 5cm in solid phantom (RW3). Also we scanned this phantom with ion chambers by Siemens® Biograph mCT. QA plans were prepared by transferring twenty five patient plans to phantom assemblies for three ion chambers. All plans were performed separately for three ion chambers at Elekta® Versa HD linear accelerator. Statistical analysis of results were made by Wilcoxon signed-rank test. Difference between dose values were determined %1.84±3.4 (p: 0.001) with Iba CC13 ion chamber, %1.80±3.4 (p: 0.002) with Iba CC04 ion chamber and %0.29±4.6 (p: 0.667) with Iba CC01 ion chamber. In stereotactic treatments, dosimetric uncertainty increases in small areas. We determined more accurate results with small sized detectors. Difference between TPS calculations and all measurements were founded lower than %2.
NASA Technical Reports Server (NTRS)
Perry, J. C.
1975-01-01
A series of electromagnetic compatibility (EMC) tests were conducted in May, 1975 in the Soviet Union. The purpose of the EMC tests was to determine the effects of the operating environment of the Soviet aircraft, Soyuz, upon the electrical performance of the USA's cable communications equipment located in Soyuz. The test procedures necessary to check out the cable communications test configuration in preparation for the EMC tests are presented.
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Must I prepare a waste management plan... December 1, 2008 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false Must I prepare a waste management plan... December 1, 2008 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
The Premotor theory of attention: time to move on?
Smith, Daniel T; Schenk, Thomas
2012-05-01
Spatial attention and eye-movements are tightly coupled, but the precise nature of this coupling is controversial. The influential but controversial Premotor theory of attention makes four specific predictions about the relationship between motor preparation and spatial attention. Firstly, spatial attention and motor preparation use the same neural substrates. Secondly, spatial attention is functionally equivalent to planning goal directed actions such as eye-movements (i.e. planning an action is both necessary and sufficient for a shift of spatial attention). Thirdly, planning a goal directed action with any effector system is sufficient to trigger a shift of spatial attention. Fourthly, the eye-movement system has a privileged role in orienting visual spatial attention. This article reviews empirical studies that have tested these predictions. Contrary to predictions one and two there is evidence of anatomical and functional dissociations between endogenous spatial attention and motor preparation. However, there is compelling evidence that exogenous attention is reliant on activation of the oculomotor system. With respect to the third prediction, there is correlational evidence that spatial attention is directed to the endpoint of goal-directed actions but no direct evidence that this attention shift is dependent on motor preparation. The few studies to have directly tested the fourth prediction have produced conflicting results, so the extent to which the oculomotor system has a privileged role in spatial attention remains unclear. Overall, the evidence is not consistent with the view that spatial attention is functionally equivalent to motor preparation so the Premotor theory should be rejected, although a limited version of the Premotor theory in which only exogenous attention is dependent on motor preparation may still be tenable. A plausible alternative account is that activity in the motor system contributes to biased competition between different sensory representations with the winner of the competition becoming the attended item. Copyright © 2012 Elsevier Ltd. All rights reserved.
ACT Test Preparation Course and Its Impact on Students' College- and Career-Readiness
ERIC Educational Resources Information Center
Parrott, Timothy Nolan
2012-01-01
This study examined the effectiveness of an ACT intervention course developed for high school juniors at Anderson County High School during the 2011-2012 school year. This study compared the ACT composite test scores of the treatment group to the ACT composite test scores of the control group by using their PLAN scores as a baseline, to determine…
NASA Technical Reports Server (NTRS)
Lewis, Pattie
2005-01-01
Headquarters National Aeronautics and Space Administration (NASA) chartered the Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objectives of the AP2 Office are to: (1) Reduce or eliminate the use of hazardous materials (HazMats) or hazardous processes at manufacturing, remanufacturing, and sustainment locations. (2) A void duplication of effort in actions required to reduce or eliminate HazMats through joint center cooperation and technology sharing. This project will identify, evaluate and approve alternative surface preparation technologies for use at NASA and Air Force Space Command (AFSPC) installations. Materials and processes will be evaluated with the goal of selecting those processes that will improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination and reduce the amount of hazardous waste generated. This Joint Test Protocol (JTP) contains the critical requirements and tests necessary to qualify alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel Applications. These tests were derived from engineering, performance, and operational impact (supportability) requirements defined by a consensus of NASA and Air Force Space Command (AFSPC) participants. The Field Test Plan (FTP), entitled Joint Test Protocol for Validation of Alternative Low Emission Surface Preparation/Depainting Technologies for Structural Steel, prepared by ITB, defines the field evaluation and testing requirements for validating alternative surface preparation/depainting technologies and supplements the JTP.
Giżyńska, Marta K.; Kukołowicz, Paweł F.; Kordowski, Paweł
2014-01-01
Aim The aim of this work is to present a method of beam weight and wedge angle optimization for patients with prostate cancer. Background 3D-CRT is usually realized with forward planning based on a trial and error method. Several authors have published a few methods of beam weight optimization applicable to the 3D-CRT. Still, none on these methods is in common use. Materials and methods Optimization is based on the assumption that the best plan is achieved if dose gradient at ICRU point is equal to zero. Our optimization algorithm requires beam quality index, depth of maximum dose, profiles of wedged fields and maximum dose to femoral heads. The method was tested for 10 patients with prostate cancer, treated with the 3-field technique. Optimized plans were compared with plans prepared by 12 experienced planners. Dose standard deviation in target volume, and minimum and maximum doses were analyzed. Results The quality of plans obtained with the proposed optimization algorithms was comparable to that prepared by experienced planners. Mean difference in target dose standard deviation was 0.1% in favor of the plans prepared by planners for optimization of beam weights and wedge angles. Introducing a correction factor for patient body outline for dose gradient at ICRU point improved dose distribution homogeneity. On average, a 0.1% lower standard deviation was achieved with the optimization algorithm. No significant difference in mean dose–volume histogram for the rectum was observed. Conclusions Optimization shortens very much time planning. The average planning time was 5 min and less than a minute for forward and computer optimization, respectively. PMID:25337411
RAWP Progress Report August 19, 2011 - Combined
Combines cover letter and Progress Report #2 as required in Residential Soil Remedial Action Work Plan (RAWP)-Phase 1, with the Analytical Laboratory Report of Walter Coke Inc site in Birmingham AL, August 16, 2011, prepared by TestAmerica Laboratories.
Consumer Education: A Conceptual Structure and Planning Guide for Senior High Schools in Wisconsin.
ERIC Educational Resources Information Center
Appleton Public Schools, WI.
Prepared by junior and senior high teachers, the curriculum guide is an interdisciplinary approach by the business education, home economics, and social studies departments to a consumer education course. The initial development of materials was field tested and revised; a second-year field testing of the revised curriculum and a final analysis…
Eagles, Jeremy S.; Carlsen, Anthony N.
2016-01-01
Movements that are executed or imagined activate a similar subset of cortical regions, but the extent to which this activity represents functionally equivalent neural processes is unclear. During preparation for an executed movement, presentation of a startling acoustic stimulus (SAS) evokes a premature release of the planned movement with the spatial and temporal features of the tasks essentially intact. If imagined movement incorporates the same preparatory processes as executed movement, then a SAS should release the planned movement during preparation. This hypothesis was tested using an instructed-delay cueing paradigm during which subjects were required to rapidly release a handheld weight while maintaining the posture of the arm or to perform first-person imagery of the same task while holding the weight. In a subset of trials, a SAS was presented at 1500, 500, or 200 ms prior to the release cue. Task-appropriate preparation during executed and imagined movements was confirmed by electroencephalographic recording of a contingent negative variation waveform. During preparation for executed movement, a SAS often resulted in premature release of the weight with the probability of release progressively increasing from 24 % at −1500 ms to 80 % at −200 ms. In contrast, the SAS rarely (<2 % of trials) triggered a release of the weight during imagined movement. However, the SAS frequently evoked the planned postural response (suppression of bicep brachii muscle activity) irrespective of the task or timing of stimulation (even during periods of postural hold without preparation). These findings provide evidence that neural processes mediating the preparation and release of the focal motor task (release of the weight) are markedly attenuated or absent during imagined movement and that postural and focal components of the task are prepared independently. PMID:25744055
The Preparation for and Execution of Engineering Operations for the Mars Curiosity Rover Mission
NASA Technical Reports Server (NTRS)
Samuels, Jessica A.
2013-01-01
The Mars Science Laboratory Curiosity Rover mission is the most complex and scientifically packed rover that has ever been operated on the surface of Mars. The preparation leading up to the surface mission involved various tests, contingency planning and integration of plans between various teams and scientists for determining how operation of the spacecraft (s/c) would be facilitated. In addition, a focused set of initial set of health checks needed to be defined and created in order to ensure successful operation of rover subsystems before embarking on a two year science journey. This paper will define the role and responsibilities of the Engineering Operations team, the process involved in preparing the team for rover surface operations, the predefined engineering activities performed during the early portion of the mission, and the evaluation process used for initial and day to day spacecraft operational assessment.
Test Plan: WIPP bin-scale CH TRU waste tests
DOE Office of Scientific and Technical Information (OSTI.GOV)
Molecke, M.A.
1990-08-01
This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientificmore » benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs.« less
2017-03-06
NASA Glenn engineer Dr. Peter Peterson prepares a high-power Hall thruster for ground testing in a vacuum chamber that simulates the environment in space. This high-powered solar electric propulsion thruster has been identified as a critical part of NASA’s future deep space exploration plans.
The visual standards for the selection and retention of astronauts, part 2
NASA Technical Reports Server (NTRS)
Allen, M. J.; Levene, J. R.; Heath, G. G.
1972-01-01
In preparation for the various studies planned for assessing visual capabilities and tasks in order to set vision standards for astronauts, the following pieces of equipment have been assembled and tested: a spectacle obstruction measuring device, a biometric glare susceptibility tester, a variable vergence amplitude testing device, an eye movement recorder, a lunar illumination simulation chamber, a night myopia testing apparatus, and retinal adaption measuring devices.
7 CFR 1710.209 - Approval requirements for load forecast work plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... cooperate in the preparation of and submittal of the load forecast work plan of their power supply borrower. (b) An approved load forecast work plan establishes the process for the preparation and maintenance... approved load forecast work plan must outline the coordination and preparation requirements for both the...
ERIC Educational Resources Information Center
Ohio State Dept. of Health, Columbus.
Guidelines are presented for planning a food service operation which is defined as any place kept or maintained for the purpose of preparing or serving meals or lunches for a consideration. Brief discussions are presented pertaining to the value of planning and the preparation and use of plans and specifications. Recommendations and specifications…
NASA Technical Reports Server (NTRS)
1981-01-01
The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.
Exploring Operational Test and Evaluation of Unmanned Aircraft Systems: A Qualitative Case Study
NASA Astrophysics Data System (ADS)
Saliceti, Jose A.
The purpose of this qualitative case study was to explore and identify strategies that may potentially remedy operational test and evaluation procedures used to evaluate Unmanned Aircraft Systems (UAS) technology. The sample for analysis consisted of organizations testing and evaluating UASs (e.g., U.S. Air Force, U.S. Navy, U.S. Army, U.S. Marine Corps, U.S. Coast Guard, and Customs Border Protection). A purposeful sampling technique was used to select 15 subject matter experts in the field of operational test and evaluation of UASs. A questionnaire was provided to participants to construct a descriptive and robust research. Analysis of responses revealed themes related to each research question. Findings revealed operational testers utilized requirements documents to extrapolate measures for testing UAS technology and develop critical operational issues. The requirements documents were (a) developed without the contribution of stakeholders and operational testers, (b) developed with vague or unrealistic measures, and (c) developed without a systematic method to derive requirements from mission tasks. Four approaches are recommended to develop testable operational requirements and assist operational testers: (a) use a mission task analysis tool to derive requirements for mission essential tasks for the system, (b) exercise collaboration among stakeholders and testers to ensure testable operational requirements based on mission tasks, (c) ensure testable measures are used in requirements documents, and (d) create a repository list of critical operational issues by mission areas. The preparation of operational test and evaluation processes for UAS technology is not uniform across testers. The processes in place are not standardized, thus test plan preparation and reporting are different among participants. A standard method to prepare and report UAS technology should be used when preparing and reporting on UAS technology. Using a systematic process, such as mission-based test design, resonated among participants as an analytical method to link UAS mission tasks and measures of performance to the capabilities of the system under test when developing operational test plans. Further research should examine system engineering designs for system requirements traceability matrix of mission tasks and subtasks while using an analysis tool that adequately evaluates UASs with an acceptable level of confidence in the results.
Cultural Resources Management Plan: Coralville Lake, Iowa.
1987-05-01
7 iAlf now* E-* ILA’AUKEE -.WlSCCqSIN -. THE ARCHAEOLOGY OF CORALVILLE LAKE, IOWA - FINAL CULTURAL RESOURCES MANAGEMENT PLAN Prepared By...2004 In Fulfillment of: Contract No. DACW25-86-C-0036 May 1987 (A -P. 7V. V T This report entitled, "The Archaeology of Coralville Lake, Iowa - Final...various studies include survey, testing, and geomorphic investigations. "The Archaeology of Coralville Lake, Iowa - Landscape Evolution" presents the
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hughes, Jamie D.
2012-05-30
The purpose of the Operational Testing and Evaluation (OT&E) phases of the project is to prepare for turnover of the Megaports System supplied by U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA)—located at the Export Lanes of the Port of Lazaro Cardenas, Mexico—to the Government of Mexico (GOM).
Secondary Waste Simulant Development for Cast Stone Formulation Testing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Russell, Renee L.; Westsik, Joseph H.; Rinehart, Donald E.
Washington River Protection Solutions, LLC (WRPS) funded Pacific Northwest National Laboratory (PNNL) to conduct a waste form testing program to implement aspects of the Secondary Liquid Waste Treatment Cast Stone Technology Development Plan (Ashley 2012) and the Hanford Site Secondary Waste Roadmap (PNNL 2009) related to the development and qualification of Cast Stone as a potential waste form for the solidification of aqueous wastes from the Hanford Site after the aqueous wastes are treated at the Effluent Treatment Facility (ETF). The current baseline is that the resultant Cast Stone (or grout) solid waste forms would be disposed at the Integratedmore » Disposal Facility (IDF). Data and results of this testing program will be used in the upcoming performance assessment of the IDF and in the design and operation of a solidification treatment unit planned to be added to the ETF. The purpose of the work described in this report is to 1) develop simulants for the waste streams that are currently being fed and future WTP secondary waste streams also to be fed into the ETF and 2) prepare simulants to use for preparation of grout or Cast Stone solid waste forms for testing.« less
Testing and evaluation for astronaut extravehicular activity (EVA) operability.
Shields, N; King, L C
1998-09-01
Because it is the human component that defines space mission success, careful planning is required to ensure that hardware can be operated and maintained by crews on-orbit. Several methods exist to allow researchers and designers to better predict how hardware designs will behave under the harsh environment of low Earth orbit, and whether designs incorporate the necessary features for Extra Vehicular Activity (EVA) operability. Testing under conditions of simulated microgravity can occur during the design concept phase when verifying design operability, during mission training, or concurrently with on-orbit mission operations. The bulk of testing is focused on normal operations, but also includes evaluation of credible mission contingencies or "what would happen if" planning. The astronauts and cosmonauts who fly these space missions are well prepared and trained to survive and be productive in Earth's orbit. The engineers, designers, and training crews involved in space missions subject themselves to Earth based simulation techniques that also expose them to extreme environments. Aircraft falling ten thousand feet, alternating g-loads, underwater testing at 45 foot depth, enclosure in a vacuum chamber and subject to thermal extremes, each carries with it inherent risks to the humans preparing for space missions.
Non-destructive bridge testing with advanced micro-II digital AE system.
DOT National Transportation Integrated Search
2011-02-02
The proposed research at the Coast Guard Blvd. in the City of Portsmouth was completed according to the plan of action prepared in consultation with the VDOT and the Virginia Council of Transportation Innovation and Research (VCTIR). The major elemen...
NASA Technical Reports Server (NTRS)
1968-01-01
Contents include the following: General release. Mission objectives. Mission description. Flight plan. Alternate missions. Experiments. Abort model. Spacecraft structure system. The Saturn 1B launch vehicle. Flight sequence. Launch preparations. Mission control center-Houston. Manned space flight network. Photographic equipment. Apollo 7 crew. Apollo 7 test program.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-18
...] Notice of Intent To Prepare a Resource Management Plan for the Bering Sea-Western Interior Planning Area... Management (BLM) Anchorage Field Office, Anchorage, Alaska, intends to prepare a Resource Management Plan... properties, visual resources, wildland fire management, lands with wilderness characteristics, forestry...
Guidelines for preparing a quality assurance plan for district offices of the U.S. Geological Survey
Schroder, L.J.; Shampine, W.J.
1992-01-01
The U.S. Geological Survey has a policy that requires each District office to prepare a Quality Assurance Plan. This plan is a combination of a District's management principles and quality assurance processes. The guidelines presented in this report provide a framework or expanded outline that a District can use to prepare a plan. Parti- cular emphasis is given to a District's: (1) quality assurance policies; (2) organization and staff responsibilities; and (3) program and project planning. The guidelines address the 'how', 'what', and 'who' questions that need to be answered when a District Quality Assurance Plan is prepared.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eckman, Todd J.; Hertzel, Ali K.; Lane, James J.
In 2013, the U.S. Department of Energy's (DOE) Hanford Site, located in Washington State, funded an update to the critical network infrastructure supporting the Hanford Federal Cloud (HFC). The project, called ET-50, was the final step in a plan that was initiated five years ago called "Hanford's IT Vision, 2015 and Beyond." The ET-50 project upgraded Hanford's core data center switches and routers along with a majority of the distribution layer switches. The upgrades allowed HFC the network intelligence to provide Hanford with a more reliable and resilient network architecture. The culmination of the five year plan improved network intelligencemore » and high performance computing as well as helped to provide 10 Gbps capable links between core backbone devices (10 times the previous bandwidth). These improvements allow Hanford the ability to further support bandwidth intense applications, such as video teleconferencing. The ET-50 switch upgrade, along with other upgrades implemented from the five year plan, have prepared Hanford's network for the next evolution of technology in voice, video, and data. Hand-in-hand with ET-50's major data center outage, Mission Support Alliance's (MSA) Information Management (IM) organization executed a disaster recovery (DR) exercise to perform a true integration test and capability study. The DR scope was planned within the constraints of ET-50's 14 hour datacenter outage window. This DR exercise tested Hanford's Continuity of Operations (COOP) capability and failover plans for safety and business critical Hanford Federal Cloud applications. The planned suite of services to be tested was identified prior to the outage and plans were prepared to test the services ability to failover from the primary Hanford data center to the backup data center. The services tested were: Core Network (backbone, firewall, load balancers); Voicemail; Voice over IP (VoIP); Emergency Notification; Virtual desktops; and, Select set of production applications and data. The primary objective of the exercise was to test COOP around the emergency operations at Hanford to provide information on capabilities and dependencies of the current system to insure improved focus of emergency, safety and security capacity in a disaster situation. The integration of the DR test into the ET-50 project allowed the testing of COOP at Hanford and allowed the lessons learned to be defined. These lessons learned have helped improve the understanding of Hanford's COOP capabilities and will be critical for future planning. With the completion of the Hanford Federal Cloud network upgrades and the disaster recovery exercise, the MSA has a clearer path forward for future technology implementations as well as network improvements to help shape the usability and reliability of the Hanford network in support of the cleanup mission.« less
ERIC Educational Resources Information Center
Ali, Syed Kamaruzaman Syed
2013-01-01
This article is related to the study of lesson planning prepared by secondary school Physical Education teachers in the Gombak district. Findings of the study show that Physical Education teachers have prepared lesson plans at satisfactory level (M = 4.13; SD = 0.79). All elements within the lesson planning components achieved high mean scores.…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-17
... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. This information... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-04
... a plan amendment is required to process a direct sale. The purpose of the public scoping process is...] Notice of Intent To Prepare an Amendment to the Redding Resource Management Plan and an Associated..., Redding, California, intends to prepare an amendment to the 1993 Redding Resource Management Plan (RMP...
It's Time to Develop a New "Draft Test Protocol" for a Mars Sample Return Mission (or Two…).
Rummel, John D; Kminek, Gerhard
2018-04-01
The last time NASA envisioned a sample return mission from Mars, the development of a protocol to support the analysis of the samples in a containment facility resulted in a "Draft Test Protocol" that outlined required preparations "for the safe receiving, handling, testing, distributing, and archiving of martian materials here on Earth" (Rummel et al., 2002 ). This document comprised a specific protocol to be used to conduct a biohazard test for a returned martian sample, following the recommendations of the Space Studies Board of the US National Academy of Sciences. Given the planned launch of a sample-collecting and sample-caching rover (Mars 2020) in 2 years' time, and with a sample return planned for the end of the next decade, it is time to revisit the Draft Test Protocol to develop a sample analysis and biohazard test plan to meet the needs of these future missions. Key Words: Biohazard detection-Mars sample analysis-Sample receiving facility-Protocol-New analytical techniques-Robotic sample handling. Astrobiology 18, 377-380.
DOT National Transportation Integrated Search
2013-06-01
This Demonstration Plan has been prepared to provide guidance and a common definition to all parties of the testing program that will be conducted for the LA-Gateway FRATIS Demonstration Project. More specifically, this document provides: Plannin...
Energy by the Numbers: Collegiate Wind Competition
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2016-05-19
The U.S. Department of Energy Collegiate Wind Competition prepares students from multiple disciplines to enter tomorrow’s wind energy workforce. As part of the competition, undergraduate students build and test a wind turbine, establish a deployment strategy, and develop and deliver a business plan.
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2010 CFR
2010-10-01
... services for designs, plans, specifications, and surveys. (6) Acquisition and preparation costs of... acquisition cost is under $100,000, it shall be reported as under $100,000. (g) Software acquisition costs include software costs incurred up through acceptance testing and material internal costs incurred to...
Workshop on the preparation of climate change action plans. Workshop summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-05-24
Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.
On-ground tests of the NISP infrared spectrometer instrument for Euclid
NASA Astrophysics Data System (ADS)
Jomni, Cyril; Ealet, Anne; Gillard, William; Prieto, Éric; Grupp, Frank U.
2017-09-01
Euclid is an ESA mission dedicated to understand the acceleration of the expansion of the Universe. The mission will measure hundred of millions of galaxies in spectrophotometry and photometry in the near infrared thanks to a spectro-photometer called NISP. This instrument will be assembled and tested in Marseille. To prepare the on-ground test plan and develop the test procedure, we have used simulated PSF images, based on a Zemax optical design of the instrument. We have developed the analysis tools that will be further used to build the procedure verification. We present here the method and analysis results to adjust the focus of the instrument. We will in particular show that because of the sampling of the PSF, a dithering strategy should be adapted and will constraint the development of the test plan.
LOGMIS Programmed Texts, Tests and Answers.
1979-04-01
This publication contains the programmed text and related test and answer booklets produced to teach field users correct procedures for utilization of the Army’s Logistics Management Information System (LOGMIS). It was prepared by ARINC Research Corporation under Contract DAEA18-77-C-0184 for the Logistics Evaluation Branch, Plans and Programs Division of the Assistant Chief of Staff for Logistics, U.S. Army Communications Command. (Author)
Air-liquid solar collector for solar heating, combined heating and cooling, and hot water subsystems
NASA Technical Reports Server (NTRS)
1978-01-01
A collection of quarterly reports consisting of the installation and layout design of the air collector system for commercial applications, completion of the preliminary design review, detailed design efforts, and preparation of the verification test plan are given. Performance specifications and performance testing of a prototype model of a two manifold, 144 tube air collector array is presented.
The Displacement of Water from a Steel Surface.
1982-11-08
example Report No. NADC-78015-20 indicates the fifteeth Center report for the year 1978, and prepared by the Systems. Directorate. The numerical ...50 Software Computer Directorate 60 Aircraft & Crew Systems Technology Directorate 70 Planning Assessment Resources 80 Eneing.Support Group . PRODUCT...Table I.- Water Displacement Tests TEST METHD Continuous water layer, A thin continuous layer of water is references (a) and (d) placed onto a steel
Structural assembly demonstration experiment, phase 1
NASA Astrophysics Data System (ADS)
Akin, David L.; Bowden, Mary L.; Miller, Rene H.
1983-03-01
The goal of this phase of the structural assembly and demonstration experiment (SADE) program was to begin to define a shuttle flight experiment that would yield data to compare on-orbit assembly operations of large space structures with neutral buoyancy simulations. In addition, the experiment would be an early demonstration of structural hardware and human capabilities in extravehicular activity (EVA). The objectives of the MIT study, as listed in the statement of work, were: to provide support in establishing a baseline neutral buoyancy testing data base, to develop a correlation technique between neutral buoyancy test results and on-orbit operations, and to prepare the SADE experiment plan (MSFC-PLAN-913).
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-13
... Fisheries Service (NMFS) is announcing its intent to prepare a recovery plan for the Sei Whale (Balaenoptera... the fax comments as ``Sei Whale Recovery Plan Information'' 3. Mail: National Marine Fisheries Service... and Threatened Species; Notice of Intent to Prepare a Recovery Plan for the Sei Whale AGENCY: National...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-24
... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. A notice was published... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...
The Computerization of the National Library in Paris.
ERIC Educational Resources Information Center
Lerin, Christian; Bernard, Annick
1986-01-01
Describes the organization and automation plan of the Bibliotheque Nationale (Paris, France) that was begun in 1981. Highlights include the method of moving toward computerization; technical choices; the choosing procedure (pre-qualification, bench-mark test); short term and pilot operations; and preparation for the implementation of the…
Theranostics Targeting Metastatic Breast Cancer
The emphasis of this first year of the award, as planned, has been on synthetic chemistry to obtain materials to test in histology, PET (positron...the previous, highly cytotoxic, compound maytensin A. We have also prepared an agent intended solely for PET , i.e. compound 4; this takes advantage of
Optical Navigation Preparations for New Horizons Pluto Flyby
NASA Technical Reports Server (NTRS)
Owen, William M., Jr.; Dumont, Philip J.; Jackman, Coralie D.
2012-01-01
The New Horizons spacecraft will encounter Pluto and its satellites in July 2015. As was the case for the Voyager encounters with Jupiter, Saturn, Uranus and Neptune, mission success will depend heavily on accurate spacecraft navigation, and accurate navigation will be impossible without the use of pictures of the Pluto system taken by the onboard cameras. We describe the preparations made by the New Horizons optical navigators: picture planning, image processing algorithms, software development and testing, and results from in-flight imaging.
40 CFR 51.116 - Data availability.
Code of Federal Regulations, 2011 CFR
2011-07-01
... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.116 Data availability. (a) The State must retain all detailed data and calculations used in the preparation of each plan... Administrator at his request. (b) The detailed data and calculations used in the preparation of plan revisions...
40 CFR 51.116 - Data availability.
Code of Federal Regulations, 2010 CFR
2010-07-01
... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.116 Data availability. (a) The State must retain all detailed data and calculations used in the preparation of each plan... Administrator at his request. (b) The detailed data and calculations used in the preparation of plan revisions...
Veggies in Space: Salad Crop Production on the ISS
NASA Technical Reports Server (NTRS)
Massa, Gioia
2016-01-01
NASA is currently testing Veggie, a low mass, low energy, salad crop production system on the International Space Station (ISS). Veggie grows crops with LED lights using ISS cabin air and passive watering that has presented challenges in microgravity. Initial tests included red romaine lettuce and zinnia, with testing of Chinese cabbage, and tomatoes planned. A goal is to add supplemental salad foods to the astronaut diet as we prepare for a future journey to Mars.
Project W-320 acceptance test report for AY-farm electrical distribution
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bevins, R.R.
1998-04-02
This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the AY-Farm Electrical Distribution System functions as required by the design criteria. This test is divided into three parts to support the planned construction schedule; Section 8 tests Mini-Power Pane AY102-PPI and the EES; Section 9 tests the SSS support systems; Section 10 tests the SSS and the Multi-Pak Group Control Panel. This test does not include the operation of end-use components (loads) supplied from the distribution system. Tests of the end-use components (loads) will be performed by other W-320 ATPs.
Some guidance on preparing validation plans for the DART Full System Models.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy
2009-03-01
Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generallymore » applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.« less
NASA Astrophysics Data System (ADS)
Purwaningsih, E.; Sutoyo, S.; Wasis; Prahani, B. K.
2018-03-01
This research is aimed to analyse the effectiveness of ComCoReLS (Concept Mapping Content Representation Lesson Study) model towards the improvement skills of Creating Physics Lesson Plan (CPLP) for pre-service physics teacher. This research used one group pre-test and post-test design on 12 pre-service physics teacher at University of Malang State (Indonesia) in academic year 2016/2017. Data collection was conducted through test and interview. Skills of creating physics lesson plan for pre-service physics teacher measurement were conducted through Physics Lesson Plan Evaluation Sheet (PLPES). The data analysis technique was done by using paired t-test and n-gain. The CoMCoReLS model consists of 5 phases, including (1) Preparation, (2) Coaching, (3) Guided Practice, (4) Independent Practice, and (5) Evaluation. In the first, second, third and fifth phases are done at University of Malang State, while the fourth phase (Independent Practice) is done in SMAN 1 Singosari, SMAN 2 Malang, SMA Lab UM, MAN 3 Malang. The results showed that there was a significant increase in skills of creating physics lesson plan for pre-service physics teacher at α = 5% and n-gain average of high category. Thus, the ComCoReLS model is effective for improving skills of creating physics lesson plan for pre-service physics teacher.
7 CFR 1724.53 - Preparation of plans and specifications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Preparation of plans and specifications. 1724.53... PROCEDURES Electric System Design § 1724.53 Preparation of plans and specifications. The provisions of this...) Transmission lines. Specifications and drawings, transmission line design data manual, vicinity maps of the...
When planning results in loss of control: intention-based reflexivity and working-memory
Meiran, Nachshon; Cole, Michael W.; Braver, Todd S.
2012-01-01
In this review, the authors discuss the seemingly paradoxical loss of control associated with states of high readiness to execute a plan, termed “intention-based reflexivity.” The review suggests that the neuro-cognitive systems involved in the preparation of novel plans are different than those involved in preparation of practiced plans (i.e., those that have been executed beforehand). When the plans are practiced, intention-based reflexivity depends on the prior availability of response codes in long-term memory (LTM). When the plans are novel, reflexivity is observed when the plan is pending and the goal has not yet been achieved. Intention-based reflexivity also depends on the availability of working-memory (WM) limited resources and the motivation to prepare. Reflexivity is probably related to the fact that, unlike reactive control (once a plan is prepared), proactive control tends to be relatively rigid. PMID:22586382
Design and implementation of a vegetarian food system for a closed chamber test.
Kloeris, V; Vodovotz, Y; Bye, L; Stiller, C Q; Lane, E
1998-01-01
The National Aeronautics and Space Administration (NASA) is conducting a series of closed chamber environmental tests, called the Lunar Mars Life Support Test Project (LMLSTP), which is designed to provide data for the development of surface habitats for the Moon and Mars. These surface habitats will be closed loop environmental systems that will recycle air and water and will grow crops to provide food for crew members. In conjunction with these tests, the Food Systems Engineering Facility at the Johnson Space Center (JSC) tested a 10-day vegetarian menu based on items that can be made from the projected crop list for these habitats. The planned menu met most of the nutritional requirements of the four crew members and was found highly acceptable. Automation of the food preparation and processing equipment was strongly recommended because the preparation time was judged excessive. The waste generated was largely due to leftovers.
The Impact of Geographical Trips on Geography Teaching
ERIC Educational Resources Information Center
Balci, Ali
2010-01-01
This study is prepared in Marmara University, Ataturk Faculty of Education, Geography Teacher Training Department Programme by arranging an expediency, planned and equipped trip with taking the opinions of the fifth grade students of 2007-2008 academic year. A knowledge test, which questions some geographical features about that district and out…
Effluent Monitoring Procedures: Nutrients. Staff Guide.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Water Programs.
This is one of several short-term courses developed to assist in the training of waste water treatment plant operational personnel in the tests, measurements, and report preparation required for compliance with their NPDES Permits. This Staff Guide provides step-by-step guidelines on course planning, development and implementation involving…
Effluent Monitoring Procedures: Metals Analyses. Staff Guide.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Water Programs.
This is one of several short-term courses developed to assist in the training of waste water treatment plant operational personnel in the tests, measurements, and report preparation required for compliance with their NPDES Permits. The Staff Guide provides step-by-step information on course planning, development, and implementation involving…
Fires, Earthquakes and Floods: How to Prepare Your Library and Staff.
ERIC Educational Resources Information Center
Kahn, Miriam
1994-01-01
Discusses emergency plans for dealing with disasters in information centers and describes four information centers' responses to various disasters. Topics addressed include authority and leadership; money and insurance; information resources, including computers and software; alternate locations and forms of communication; and testing. A list of…
75 FR 25884 - NIJ Body Armor Compliance Testing Program Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-10
... questions. Participants are strongly encouraged to come prepared to ask questions. Space is limited at this... to this limit may occur, should space allow. Participants planning to attend are responsible for their own travel arrangements. Please use the following http://www.justnet.org/Pages/RecordView.aspx...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartke, T.C.
Under the US Department of Energy's Underground-Coal-Conversion program, four field tests were completed in 1979 and preparations were begun in 1980 for two additional field tests to be operated in 1981. The Laramie Energy Technology Center (LETC) and Sandia National Laboratories (SNL) completed Hanna IV, an air gasification test in Wyoming subbituminous coal. The Morgantown Energy Technology Center (METC) completed Pricetown 1, an air gasification test in West Virginia bituminous coal. Lawrence Livermore National Laboratory (LLNL) completed Hoe Creek 3, a steam-oxygen gasification test in Wyoming subbituminous coal. Gulf Research and Development Co. completed Steeply Dipping Beds (SDB) Test 1,more » primarily an air gasification test in Wyoming subbituminous coal and the first SDB test in the US. In 1980, Gulf R and D Co. began preparation of SDB Test 2, scheduled for operation in the fall of 1981. The DOE project teams at LETC, METC, LLNL, and SNL, in association with the Washington Irrigation and Development Co. (WIDCo), Washington Water Power (WWP), and the State of Washington, are preparing a field test site in the Centralia-Chehalis coal district of Washington. A series of large coal block tests will be completed prior to the field test, scheduled for operation in 1982 or 1983. This field test will utilize a directionally drilled link and steam-oxygen gasification system. This paper summarizes the results of the four recently completed field tests and the plans for additional tests.« less
The structure of affective action representations: temporal binding of affective response codes.
Eder, Andreas B; Müsseler, Jochen; Hommel, Bernhard
2012-01-01
Two experiments examined the hypothesis that preparing an action with a specific affective connotation involves the binding of this action to an affective code reflecting this connotation. This integration into an action plan should lead to a temporary occupation of the affective code, which should impair the concurrent representation of affectively congruent events, such as the planning of another action with the same valence. This hypothesis was tested with a dual-task setup that required a speeded choice between approach- and avoidance-type lever movements after having planned and before having executed an evaluative button press. In line with the code-occupation hypothesis, slower lever movements were observed when the lever movement was affectively compatible with the prepared evaluative button press than when the two actions were affectively incompatible. Lever movements related to approach and avoidance and evaluative button presses thus seem to share a code that represents affective meaning. A model of affective action control that is based on the theory of event coding is discussed.
How we shipped our flip and standard too
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deigl, H.J.; Feltz, D.E.
1984-07-01
This paper highlights the planning and handling activities for the shipment of irradiated TRIGA fuel from Texas A and M University to the Argonne National Lab/West (ANL/West) reactor facility at Idaho Falls, Idaho. Attention is focused on the enormous time spent on the planning and preparations prior to the shipment. The actual handling time at the NSCR for three shipping packages containing a total 51 elements was only 4 days, but, the time spent in planning and preparation exceeded 16 months. The fuel was transferred for shipment without incident - and from a health physics standpoint the exercise went verymore » well. Whole body exposures and hand doses were minimal for such a large undertaking. ANL/West health physicists reported contamination of the lifting devices for the HFIR when they received the cask. These pieces were wipe tested and contamination was found to be less than 200 dpm. If they were contaminated we were extremely fortunate during handling not to contaminate our facility or personnel.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1992-08-01
The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads,more » drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chancellor, Christopher John
2016-11-07
The purpose of this report is to present the results of the acceptable knowledge (AK) review of oxidizers present in active waste streams, provide a technical analysis of the oxidizers, and report the results of the scoping study testing. This report will determine the fastest burning oxidizer to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-002, Sorbent Scoping Studies, contains similar information for sorbents identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scopingmore » studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.« less
Experimental Evaluation of Prepared Lesson Plans on Instruction in Vocational Agriculture.
ERIC Educational Resources Information Center
Ahrens, Donald Louis
To determine the value of prepared lesson plans on instruction in vocational agriculture, 12 randomly selected Iowa high schools with approved vocational agriculture programs were randomly divided into two groups of six including a control group and a treatment group. Prepared lesson plans provided the only variance in instruction. Two meetings…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-05
...] Notice of Intent To Amend the 1985 Wisconsin Resource Management Plan and Prepare an Associated Environmental Analysis and Notice of Realty Action for the Direct (Non-Competitive) Sale of Reversionary...) intends to amend the 1985 Wisconsin Resource Management Plan (RMP) and prepare an associated Environmental...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gillespie, B.M.; Stromatt, R.W.; Ross, G.A.
This data package contains the results obtained by Pacific Northwest Laboratory (PNL) staff in the characterization of samples for the 101-SY Hydrogen Safety Project. The samples were submitted for analysis by Westinghouse Hanford Company (WHC) under the Technical Project Plan (TPP) 17667 and the Quality Assurance Plan MCS-027. They came from a core taken during Window C'' after the May 1991 gas release event. The analytical procedures required for analysis were defined in the Test Instructions (TI) prepared by the PNL 101-SY Analytical Chemistry Laboratory (ACL) Project Management Office in accordance with the TPP and the QA Plan. The requestedmore » analysis for these samples was volatile organic analysis. The quality control (QC) requirements for each sample are defined in the Test Instructions for each sample. The QC requirements outlined in the procedures and requested in the WHC statement of work were followed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gillespie, B.M.; Stromatt, R.W.; Ross, G.A.
This data package contains the results obtained by Pacific Northwest Laboratory (PNL) staff in the characterization of samples for the 101-SY Hydrogen Safety Project. The samples were submitted for analysis by Westinghouse Hanford Company (WHC) under the Technical Project Plan (TPP) 17667 and the Quality Assurance Plan MCS-027. They came from a core taken during Window ``C`` after the May 1991 gas release event. The analytical procedures required for analysis were defined in the Test Instructions (TI) prepared by the PNL 101-SY Analytical Chemistry Laboratory (ACL) Project Management Office in accordance with the TPP and the QA Plan. The requestedmore » analysis for these samples was volatile organic analysis. The quality control (QC) requirements for each sample are defined in the Test Instructions for each sample. The QC requirements outlined in the procedures and requested in the WHC statement of work were followed.« less
Development of Guidelines for In-Situ Repair of SLS-Class Composite Flight Hardware
NASA Technical Reports Server (NTRS)
Weber, Thomas P., Jr.; Cox, Sarah B.
2018-01-01
The purpose of composite repair development at KSC (John F. Kennedy Space Center) is to provide support to the CTE (Composite Technology for Exploration) project. This is a multi-space center effort with the goal of developing bonded joint technology for SLS (Space Launch System) -scale composite hardware. At KSC, effective and efficient repair processes need to be developed to allow for any potential damage to composite components during transport or launch preparation. The focus of the composite repair development internship during the spring of 2018 was on the documentation of repair processes and requirements for process controls based on techniques developed through hands-on work with composite test panels. Three composite test panels were fabricated for the purpose of repair and surface preparation testing. The first panel included a bonded doubler and was fabricated to be damaged and repaired. The second and third panels were both fabricated to be cut into lap-shear samples to test the strength of bond of different surface preparation techniques. Additionally, jointed composite test panels were impacted at MSFC (Marshall Space Flight Center) and analyzed for damage patterns. The observations after the impact tests guided the repair procedure at KSC to focus on three repair methods. With a finalized repair plan in place, future work will include the strength testing of different surface preparation techniques, demonstration of repair methods, and repair of jointed composite test panels being impacted at MSFC.
NASA Technical Reports Server (NTRS)
Thorman, H. C.
1975-01-01
Key characteristics of the Deep Space Network Test and Training System were presented. Completion of the Mark III-75 system implementation is reported. Plans are summarized for upgrading the system to a Mark III-77 configuration to support Deep Space Network preparations for the Mariner Jupiter/Saturn 1977 and Pioneer Venus 1978 missions. A general description of the Deep Space Station, Ground Communications Facility, and Network Operations Control Center functions that comprise the Deep Space Network Test and Training System is also presented.
Orion Pad Abort 1 Flight Test - Ground and Flight Operations
NASA Technical Reports Server (NTRS)
Hackenbergy, Davis L.; Hicks, Wayne
2011-01-01
This paper discusses the ground and flight operations aspects to the Pad Abort 1 launch. The paper details the processes used to plan all operations. The paper then discussions the difficulties of integration and testing, while detailing some of the lessons learned throughout the entire launch campaign. Flight operational aspects of the launc are covered in order to provide the listener with the full suite of operational issues encountered in preparation for the first flight test of the Orion Launch Abort System.
Integrating payload design, planning, and control in the Dutch Utilisation Centre
NASA Technical Reports Server (NTRS)
Grant, T. J.
1993-01-01
Spacecraft payload design, experiment planning and scheduling, and payload control are traditionally separate areas of activity. This paper describes the development of a prototype software tool--the Activity Scheduling System (ASS)--which integrates these activity areas. ASS is part of a larger project to build a Dutch Utilisation Centre (DUC), intended eventually to support all space utilization activities in The Netherlands. ASS has been tested on the High Performance Capillary Electrophoresis payload. The paper outlines the integrated preparation and operations concept embodied in ASS. It describes the ASS prototype, including a typical session. The results of testing are summarized. Possible enhancement of ASS, including integration into DUC, is sketched.
Long-term care planning and preparation among persons with multiple sclerosis.
Putnam, Michelle; Tang, Fengyan
2008-01-01
Individuals with multiple sclerosis (MS) primarily rely on informal supports such as family members and assistive technology to meet their daily needs. As they age, formal supports may become important to compliment these supports and sustain community-based living. No previous research exists exploring plans and preparations of persons with MS for future independent living and long-term care needs. We analyzed data from a random sample survey (N = 580) to assess knowledge and perceptions of future service needs using ANOVA, chi-square, correlations, and MANOVA procedures. Results indicate that overall, most respondents are not well informed and have not planned or prepared for future care needs. Persons reporting severe MS were more likely to plan and prepare. Key "entry points" for making preparations include receiving specific education and planning information, discussions with family and professional service providers, and increased age, education, and income. We recommend greater infusion of long-term care planning into these existing entry points and creation of new entry points including healthcare provides and insurers.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-08
....HAG11-0203] Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning... Planning Area and by this notice is announcing the beginning of the scoping process to solicit public comments and identify issues. The West Eugene Wetlands Planning Area comprises approximately 1,340 acres of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-26
... Environmental Assessment (EA) to consider leasing Federal coal in response to lease application ALES-55199 for.... A mine plan scenario will be prepared for the Federal coal resource as an analytical tool to inform... Prepare a Resource Management Plan Amendment and Associated Environmental Assessment for Coal Lease by...
Code of Federal Regulations, 2010 CFR
2010-10-01
... approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in... opportunities to approve planning or design documents prepared by the Self-Governance Tribe? Yes, but only if...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Butcher, T.A.
1983-05-01
This report describes Phase I of a study of the fouling of condensing heat exchangers in residential oil-fired boiler and furnaces. The first phase consists of a review of available information on soot information in residential systems and the preparation of a work plan for Phase II. In the literature review the effects of burner type, startup and shutdown, time from tuning, fuel quality, combustion chambers, nozzles, and fuel additives are discussed. While data are available on soot emissions with current burners and fuels there are limited data available on advanced burners and degraded fuels with modern burners. The Phasemore » II work will provide an evaluation of the need for the development of advanced burner concepts for oil-fired condensing systems. Planned experimental work includes a furnace draft optimization study, extended fouling tests, a blue flame/yellow flame comparative test, and some degraded fuel teste.« less
Measuring pregnancy planning: A psychometric evaluation and comparison of two scales.
Drevin, Jennifer; Kristiansson, Per; Stern, Jenny; Rosenblad, Andreas
2017-11-01
To psychometrically test the London Measure of Unplanned Pregnancy and compare it with the Swedish Pregnancy Planning Scale. The incidence of unplanned pregnancies is an important indicator of reproductive health. The London Measure of Unplanned Pregnancy measures pregnancy planning by taking contraceptive use, timing, intention to become pregnant, desire for pregnancy, partner agreement, and pre-conceptual preparations into account. It has, however, previously not been psychometrically evaluated using confirmatory factor analysis. The Likert-scored single-item Swedish Pregnancy Planning Scale has been developed to measure the woman's own view of pregnancy planning level. Cross-sectional design. In 2012-2013, 5493 pregnant women living in Sweden were invited to participate in the Swedish Pregnancy Planning study, of whom 3327 (61%) agreed to participate and answered a questionnaire. A test-retest pilot study was conducted in 2011-2012. Thirty-two participants responded to the questionnaire on two occasions 14 days apart. Data were analysed using confirmatory factor analysis, Cohen's weighted kappa and Spearman's correlation. All items of the London Measure of Unplanned Pregnancy contributed to measuring pregnancy planning, but four items had low item-reliability. The London Measure of Unplanned Pregnancy and Swedish Pregnancy Planning Scale corresponded reasonably well with each other and both showed good test-retest reliability. The London Measure of Unplanned Pregnancy may benefit from item reduction and its usefulness may be questioned. The Swedish Pregnancy Planning Scale is time-efficient and shows acceptable reliability and construct validity, which makes it more useful for measuring pregnancy planning. © 2017 John Wiley & Sons Ltd.
Phase 2 STS new user development program. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Mcdowell, J. R.
1976-01-01
A methodology for developing new users for STS other than NASA and DoD, thereby maximizing the use of the STS system was developed. The approach to user development, reflected in the implementation plan, and attendant informational material to be used were evaluated by conducting a series of test cases with selected user organizations. These test case organizations were, in effect, used as consultants to evaluate the effectiveness, the needs, the completeness, and the adequacy of the user development approach and informational material. The selection of the test cases provided a variety of potential STS users covering industry, other government agencies, and the educational sector. The test cases covered various use areas and provided a mix of user organization types. A summary of the actual test cases conducted is given. The conduct of the test cases verified the general approach of the implementation plan, the validity of the user development strategy prepared for each test case organization and the effectiveness of the STS basic and user customized informational material.
França, Lucia H F; Hershey, Douglas A
2018-03-01
In this investigation, we attempt to replicate the Interdisciplinary Financial Planning Model advanced by Hershey et al. (International Journal of Aging and Human Development, 70, 1-38, 2010) using a sample of Brazilian adults. This model, which was originally tested on individuals from The Netherlands and the United States, posits that psychological, social, and economic forces are key determinants of retirement planning practices and perceptions of saving adequacy. Taken together, fifteen hypotheses were subject to evaluation. Participants were 167 Brazilian working adults, 21-69 years of age, who were married or cohabitating at the time of testing. A path analysis model showed substantial support for the theoretical framework, with all variables found to contribute directly or indirectly to the prediction of financial planning and saving adequacy. Furthermore, two new paths were found to emerge in the Brazilian model that were not observed in the original investigation. This cross-national replication of the Interdisciplinary Financial Planning Model extends research on the topic to a developing country in which relatively few empirical studies of retirement planning have been carried out. Other analyses in the article focus on direct comparisons between the Brazilian model and the models developed based on American and Dutch respondents, with an eye toward better understanding how cultural forces shape the retirement planning process. The discussion focuses on how models of financial planning, such as the Hershey et al. (2010) model, can inform the development of savings-oriented education and intervention programs.
NASA Technical Reports Server (NTRS)
Wilson, D. J.; Krause, M. C.; Craven, C. E.; Edwards, B. B.; Coffey, E. W.; Huang, C. C.; Jetton, J. L.; Morrison, L. K.
1974-01-01
A program plan for system evaluation of the two-dimensional Scanning Laser Doppler System (SLDS) is presented. In order to meet system evaluation and optimization objectives the following tests were conducted: (1) noise tests; (2) wind tests; (3) blower flowfield tests; (4) single unit (1-D) flyby tests; and (5) dual unit (2-D) flyby tests. Test results are reported. The final phase of the program included logistics preparation, equipment interface checkouts, and data processing. It is concluded that the SLDS is capable of accurately tracking aircraft wake vortices from small or large aircraft, and in any type of weather.
Heavy hydrocarbon main injector technology
NASA Technical Reports Server (NTRS)
Fisher, S. C.; Arbit, H. A.
1988-01-01
One of the key components of the Advanced Launch System (ALS) is a large liquid rocket, booster engine. To keep the overall vehicle size and cost down, this engine will probably use liquid oxygen (LOX) and a heavy hydrocarbon, such as RP-1, as propellants and operate at relatively high chamber pressures to increase overall performance. A technology program (Heavy Hydrocarbon Main Injector Technology) is being studied. The main objective of this effort is to develop a logic plan and supporting experimental data base to reduce the risk of developing a large scale (approximately 750,000 lb thrust), high performance main injector system. The overall approach and program plan, from initial analyses to large scale, two dimensional combustor design and test, and the current status of the program are discussed. Progress includes performance and stability analyses, cold flow tests of injector model, design and fabrication of subscale injectors and calorimeter combustors for performance, heat transfer, and dynamic stability tests, and preparation of hot fire test plans. Related, current, high pressure, LOX/RP-1 injector technology efforts are also briefly discussed.
31. Photocopy of map. Insert from Master Plan Notes Prepared ...
31. Photocopy of map. Insert from Master Plan Notes Prepared by Environmental Planning and Design, Pittsburgh, Pa. Original at Missouri Botanical Garden. 1972 MASTER PLAN 32. 'THE TREE,' SCULPTURE BY ALEXANDER CALDER, 1966 - Missouri Botanical Garden, 2345 Tower Grove Avenue, Saint Louis, Independent City, MO
40 CFR 60.258 - Reporting and recordkeeping.
Code of Federal Regulations, 2011 CFR
2011-07-01
... occurrences when the measurements of the scrubber pressure loss, water supply flow rate, or pH of the wet... stabilizer or water purchased for use in the coal preparation and processing plant. (5) Monthly certification... plan, if any, shall be noted. (9) During a performance test of a wet scrubber, and each operating day...
The Hawaii English Project: Brave New Venture.
ERIC Educational Resources Information Center
Nunes, Shiho
1967-01-01
The Hawaii English Project, the first major developmental task of the Hawaii Curriculum Center sponsored jointly by the University of Hawaii and the Hawaii Department of Education, was set up to prepare and test an English curriculum (K-12) and to develop a plan for the curriculum's establishment throughout the state. At the center of the…
40 CFR 60.258 - Reporting and recordkeeping.
Code of Federal Regulations, 2012 CFR
2012-07-01
... occurrences when the measurements of the scrubber pressure loss, water supply flow rate, or pH of the wet... stabilizer or water purchased for use in the coal preparation and processing plant. (5) Monthly certification... plan, if any, shall be noted. (9) During a performance test of a wet scrubber, and each operating day...
40 CFR 60.258 - Reporting and recordkeeping.
Code of Federal Regulations, 2014 CFR
2014-07-01
... occurrences when the measurements of the scrubber pressure loss, water supply flow rate, or pH of the wet... stabilizer or water purchased for use in the coal preparation and processing plant. (5) Monthly certification... plan, if any, shall be noted. (9) During a performance test of a wet scrubber, and each operating day...
40 CFR 60.258 - Reporting and recordkeeping.
Code of Federal Regulations, 2013 CFR
2013-07-01
... occurrences when the measurements of the scrubber pressure loss, water supply flow rate, or pH of the wet... stabilizer or water purchased for use in the coal preparation and processing plant. (5) Monthly certification... plan, if any, shall be noted. (9) During a performance test of a wet scrubber, and each operating day...
Managers Handbook for Software Development
NASA Technical Reports Server (NTRS)
Agresti, W.; Mcgarry, F.; Card, D.; Page, J.; Church, V.; Werking, R.
1984-01-01
Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.
This protocol was developed under the Environmental Protection Agency's Environmental Technology Verification (ETV) Program, and is intended to be used as a guide in preparing laboratory test plans for the purpose of verifying the performance of grouting materials used for infra...
Effluent Monitoring Procedures: Basic Parameters for Municipal Effluents. Staff Guide.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Water Programs.
This is one of several short-term courses developed to assist in the training of waste water treatment plant operational personnel in the tests, measurements, and report preparation required for compliance with their NPDES Permits. This Staff Guide provides step-by-step guidelines on course planning, development and implementation involving…
Composite-Unit Accelerated Life Testing (CUALT) of Sonar Transducers
1979-09-01
Developed and technically defended the Texas Research Institute CUALT plan, Helped prepare sections 5 and 7. Edward Hobaica and Ray Haworth - Developed...le2--Te- TT-Sonar 3R. A. Larmi, E. C. Hobaica , Failure Modes & Effects Analysis for the DT-308’ (now called the DT-605) Hydrophone, EB Div Report No.: U
Engineering Encounters: The Tightrope Challenge
ERIC Educational Resources Information Center
Burton, Bill
2014-01-01
In order to prepare students to become the next innovators, teachers need to provide real-world challenges that allow children to exercise their innovation muscles. Innovation starts with a problem and innovators work to solve a problem by planning, creating, and testing. The real-world innovation process does not happen on a worksheet, and it…
ERIC Educational Resources Information Center
De La Paz, Susan; Owen, Bonnie; Harris, Karen R.; Graham, Steve
2000-01-01
This article describes implementation of the Self-Regulated Strategy Development (SRSD) approach to help students learn a specific essay writing strategy in preparation for a state writing test. It also reviews the theoretical and research bases for using SRSD to teaching writing strategies. (Contains references.) (DB)
Whole-Grain Continuing Education for School Foodservice Personnel: Keeping Kids from Falling Short
ERIC Educational Resources Information Center
Roth-Yousey, Lori; Barno, Trina; Caskey, Mary; Asche, Kimberly; Reicks, Marla
2009-01-01
Objective: The purpose of this project was to develop and test whole-grain continuing education for school foodservice personnel. Methods: A continuing education program was developed to address planning, purchasing, preparing, and serving whole-grain food in schools. Participants completed a pre-post questionnaire to assess changes in knowledge,…
Research and development support for the Center for Seismic Studies
NASA Astrophysics Data System (ADS)
Romney, C. F.; Huszar, L.; Frazier, G. A.
1984-07-01
Work during the second and third quarters of FY1984 continued to be focused on the development of the Center for Seismic Studies, and on planning and developments to prepare for a test of Seismic data exchange and event determination, as proposed by the group of Scientific Experts, UN Committee on Disarmament. A help system was designed and partially completed, and other aids for new users of the Center's data and facilities were developed. An introduction to Ingres was prepared, and new experimental data bases were installed.
Hexographic Method of Complex Town-Planning Terrain Estimate
NASA Astrophysics Data System (ADS)
Khudyakov, A. Ju
2017-11-01
The article deals with the vital problem of a complex town-planning analysis based on the “hexographic” graphic analytic method, makes a comparison with conventional terrain estimate methods and contains the method application examples. It discloses a procedure of the author’s estimate of restrictions and building of a mathematical model which reflects not only conventional town-planning restrictions, but also social and aesthetic aspects of the analyzed territory. The method allows one to quickly get an idea of the territory potential. It is possible to use an unlimited number of estimated factors. The method can be used for the integrated assessment of urban areas. In addition, it is possible to use the methods of preliminary evaluation of the territory commercial attractiveness in the preparation of investment projects. The technique application results in simple informative graphics. Graphical interpretation is straightforward from the experts. A definite advantage is the free perception of the subject results as they are not prepared professionally. Thus, it is possible to build a dialogue between professionals and the public on a new level allowing to take into account the interests of various parties. At the moment, the method is used as a tool for the preparation of integrated urban development projects at the Department of Architecture in Federal State Autonomous Educational Institution of Higher Education “South Ural State University (National Research University)”, FSAEIHE SUSU (NRU). The methodology is included in a course of lectures as the material on architectural and urban design for architecture students. The same methodology was successfully tested in the preparation of business strategies for the development of some territories in the Chelyabinsk region. This publication is the first in a series of planned activities developing and describing the methodology of hexographical analysis in urban and architectural practice. It is also planned to create a software product that allows one to automate the process of site assessment on the basis of the methodology.
Thalmayer, Amber Gayle; Friedman, Sarah A; Azocar, Francisca; Harwood, Jessica M; Ettner, Susan L
2017-05-01
The Mental Health Parity and Addiction Equity Act (MHPAEA) significantly changed regulations governing behavioral health benefits for large, commercially insured employers. Pre-MHPAEA, many plans covered only a specific number of behavioral health treatment days or visits; post-MHPAEA, such quantitative treatment limits (QTLs) were allowed only if they were "at parity" with medical-surgical limits. This study assessed MHPAEA's effect on the prevalence of behavioral health QTLs. Analyses used 2008-2013 specialty behavioral health benefit design data for Optum large-group plans, both carve-outs (N=2,257 plan-years, corresponding to 1,527 plans and 40 employers) and carve-ins (N=11,644 plan-years, 3,569 plans, and 340 employers). Descriptive statistics were calculated for limits existing at parity implementation, distinguished by accumulation period (annual or lifetime), level of care (inpatient, intermediate, or outpatient), unit (days, visits, or courses), condition, and network level. Proportions of plans using specific limits during the preparity (2008-2009), transition (2010), and postparity (2011-2013) periods were compared with Fisher's exact tests. Preparity, the most common QTLs were annual visit or day limits. Accounting for overlap in limit types, 89% of regular carve-out plans, 90% of in-network-only carve-outs, and 77% of carve-in plans limited outpatient visits; 66% of regular carve-out plans, 74% of in-network-only carve-outs, and 73% of carve-ins limited inpatient or intermediate days. Postparity, QTLs almost entirely disappeared (p<.001). Before MHPAEA, QTLs were common. Postimplementation, virtually all plans dropped such limits, suggesting that MHPAEA was effective at eliminating QTLs. However, increasing access to behavioral health care will mean going beyond such QTL changes and looking at other areas of benefit management.
Preparation and Integration of ALHAT Precision Landing Technology for Morpheus Flight Testing
NASA Technical Reports Server (NTRS)
Carson, John M., III; Robertson, Edward A.; Pierrottet, Diego F.; Roback, Vincent E.; Trawny, Nikolas; Devolites, Jennifer L.; Hart, Jeremy J.; Estes, Jay N.; Gaddis, Gregory S.
2014-01-01
The Autonomous precision Landing and Hazard Avoidance Technology (ALHAT) project has developed a suite of prototype sensors for enabling autonomous and safe precision land- ing of robotic or crewed vehicles on solid solar bodies under varying terrain lighting condi- tions. The sensors include a Lidar-based Hazard Detection System (HDS), a multipurpose Navigation Doppler Lidar (NDL), and a long-range Laser Altimeter (LAlt). Preparation for terrestrial ight testing of ALHAT onboard the Morpheus free- ying, rocket-propelled ight test vehicle has been in progress since 2012, with ight tests over a lunar-like ter- rain eld occurring in Spring 2014. Signi cant work e orts within both the ALHAT and Morpheus projects has been required in the preparation of the sensors, vehicle, and test facilities for interfacing, integrating and verifying overall system performance to ensure readiness for ight testing. The ALHAT sensors have undergone numerous stand-alone sensor tests, simulations, and calibrations, along with integrated-system tests in special- ized gantries, trucks, helicopters and xed-wing aircraft. A lunar-like terrain environment was constructed for ALHAT system testing during Morpheus ights, and vibration and thermal testing of the ALHAT sensors was performed based on Morpheus ights prior to ALHAT integration. High- delity simulations were implemented to gain insight into integrated ALHAT sensors and Morpheus GN&C system performance, and command and telemetry interfacing and functional testing was conducted once the ALHAT sensors and electronics were integrated onto Morpheus. This paper captures some of the details and lessons learned in the planning, preparation and integration of the individual ALHAT sen- sors, the vehicle, and the test environment that led up to the joint ight tests.
Cost-Benefit Analysis for Alternatives to Aliphatic Isocyanate Polyurethanes
NASA Technical Reports Server (NTRS)
Lewis, Pattie
2007-01-01
NASA and Air Force Space Command (AFSPC) have similar missions and therefore similar facilities and structures in similar environments. The standard practice for protecting metallic substrates in atmospheric environments is the application of an applied coating system. The most common topcoats used in coating systems are polyurethanes that contain isocyanates. Isocyanates are classified as potential human carcinogens and are known to cause cancer in animals. The primary objective of this effort was to demonstrate and validate alternatives to aliphatic isocyanate polyurethanes resulting in one or more isocyanate-free coatings qualified for use at AFSPC and NASA installations participating in this project. This Cost-Benefit Analysis (CBA) quantifies the estimated capital and process costs of coating alternatives and cost savings relative to the current coatings. The estimates in this CBA are to be used for assessing the relative merits of the selected alternatives. The actual economic effects at any specific facility will depend on the alternative material or technology implemented, the number of actual applications converted, future workloads, and other factors . The participants initially considered eighteen (18) alternative coatings as described in the Potential Alternatives Report entitled Potential Alternatives Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, prepared by ITB. Of those, 8 alternatives were selected for testing in accordance with the Joint Test Protocol entitled Joint Test Protocol for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, and the Field Test Plan entitled Field Evaluations Test Plan for Validation of Alternatives 10 Aliphatic Isocyanate Polyurethanes, both of which were prepared by ITB. A joint Test Report entitled Joint Test Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, prepared by ITB, documents the results of the laboratory and field testing, as well as any test modifications made during the execution of the testing. The coatings selected for evaluation in this CBA are shown in the table below. Only one control coating system is considered in this analysis. These coatings were either downselected for Phase II or performed well enough to be included in the Qualified Products List in the NASA technical standard NASA-STD-5008, Protective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support Equipment.
Conceptual definition of a technology development mission for advanced solar dynamic power systems
NASA Technical Reports Server (NTRS)
Migra, R. P.
1986-01-01
An initial conceptual definition of a technology development mission for advanced solar dynamic power systems is provided, utilizing a space station to provide a dedicated test facility. The advanced power systems considered included Brayton, Stirling, and liquid metal Rankine systems operating in the temperature range of 1040 to 1400 K. The critical technologies for advanced systems were identified by reviewing the current state of the art of solar dynamic power systems. The experimental requirements were determined by planning a system test of a 20 kWe solar dynamic power system on the space station test facility. These requirements were documented via the Mission Requirements Working Group (MRWG) and Technology Development Advocacy Group (TDAG) forms. Various concepts or considerations of advanced concepts are discussed. A preliminary evolutionary plan for this technology development mission was prepared.
Faramarzi, Mahbobeh; Pasha, Hajar; Khafri, Sorayya; Heidary, Shima
2017-03-01
Familiarity with coping strategies is essential for stress management during pregnancy. The Revised Prenatal Coping Inventory (Nu-PCI) was developed to assess coping strategies during pregnancy. This study aimed to assess the factor structure and psychometric properties of the Persian version of the Nu-PCI. After forward-backward translation, the Nu-PCI was administered to 210 pregnant women who were enrolled in two teaching referral clinics in the North of the Islamic Republic of Iran (Babol). The participants completed the Persian Nu-PCI and Ways of Coping Questionnaire (WCQ), which was used to determine the validity of the Persian Nu-PCI. To test construct validity of the Persian Nu-PCI, a principal components factor analysis was performed. Principal components analysis with varimax rotation showed a best fitting 3-factor structure similar to the original with three coping subscales: planning-preparation, avoidance, and spiritual-positive coping. The Persian Nu-PCI was internally consistent and within the acceptable range (α=0.89-0.97). The alpha coefficients for the Nu-PCI and the subscales of planning-preparation, avoidance, and spiritual-positive coping were high. Test-retest coefficients for the Nu-PCI and subscales were 0.98-0.99. The Nu-PCI and its subscales correlated with the WCQ in the entire sample and within each trimester. The Persian version of the Nu-PCI and the subscales of planning-preparation, avoidance, and spiritual-positive coping represent the first reliable standardized tool for measuring coping strategies during pregnancy in the Islamic Republic of Iran. Therefore, it can be applied as a quick and accurate preliminary screening tool for evaluating coping strategies throughout pregnancy in clinics and other medical and research settings.
Potential Alternatives Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes
NASA Technical Reports Server (NTRS)
Lewis, pattie
2011-01-01
Identifying and selecting alternative materials and technologies that have the potential to reduce the identified HazMats and hazardous air pollutants (HAPs), while incorporating sound corrosion prevention and control technologies, is a complicated task due to the fast pace at which new technologies emerge and rules change. The alternatives are identified through literature searches, electronic database and Internet searches, surveys, and/or personal and professional contacts. Available test data was then compiled on the proposed alternatives to determine if the materials meet the test objectives or if further)laboratory or field-testing will be required. After reviewing technical information documented in the PAR, government representatives, technical representatives from the affected facilities, and other stakeholders involved in the process will select the list of viable alternative coatings for consideration and testing under the project's Joint Test Protocol entitled Joint Test Protocol for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes and Field Test Plan entitled Field Evaluations Test Plan for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, both prepared by ITB. Test results will be reported in a Joint Test Report upon completion oftesting. The selection rationale and conclusions are documented in this PAR. A cost benefit analysis will be prepared to quantify the estimated capital and process costs of coating alternatives and cost savings relative to the current coating processes, however, some initial cost data has been included in this PAR. For this coatings project, isocyanates, as found in aliphatic isocyanate polyurethanes, were identified as the target HazMat to be eliminated. Table 1-1 lists the target HazMats, the related process and application, current specifications, and affected programs.
Mass-casualty events at schools: a national preparedness survey.
Graham, James; Shirm, Steve; Liggin, Rebecca; Aitken, Mary E; Dick, Rhonda
2006-01-01
Recent school shootings and terrorist events have demonstrated the need for well-coordinated planning for school-based mass-casualty events. The objective of this study was to document the preparedness of public schools in the United States for the prevention of and the response to a mass-casualty event. A survey was mailed to 3670 school superintendents of public school districts that were chosen at random from a list of school districts from the National Center for Education Statistics of the US Department of Education in January 2004. A second mailing was sent to nonresponders in May 2004. Descriptive statistics were used for survey variables, and the chi2 test was used to compare urban versus rural preparedness. The response rate was 58.2% (2137 usable surveys returned). Most (86.3%) school superintendents reported having a response plan, but fewer (57.2%) have a plan for prevention. Most (95.6%) have an evacuation plan, but almost one third (30%) had never conducted a drill. Almost one quarter (22.1%) have no disaster plan provisions for children with special health care needs, and one quarter reported having no plans for postdisaster counseling. Almost half (42.8%) had never met with local ambulance officials to discuss emergency planning. Urban school districts were better prepared than rural districts on almost all measures in the survey. There are important deficiencies in school emergency/disaster planning. Rural districts are less well prepared than urban districts. Disaster/mass-casualty preparedness of schools should be improved through coordination of school officials and local medical and emergency officials.
NASA Technical Reports Server (NTRS)
Paliwoda, L.
1998-01-01
This document contains the procedure and the test results of the Advanced Microwave Sounding Unit-A (AMSU-A) Earth Observing System (EOS) Project, assembly part number 1356008-1, serial number 202, Electromagnetic Interference (EMI) and Electromagnetic Susceptibility (EMC) qualification test. The test was conducted in accordance with the approved EMI/EMC Test Plan/Procedure, Specification number AE-26151/8B, dated 10 September 1998. Aerojet intends that the presentation and submittal of this document, prepared in accordance with the objectives established by the aforementioned Test Plan/Procedure, document number AE-26151/8B, will satisfy the data requirement with respect to the AMSU-A/EOS instrument operational compliance of the EMI/EMC test requirement. Test for the AMSU-A/EOS instrument have been completed and all the requirements per General Interface Requirement Document (GIRD), GSFC 422-11-12-01, for EOS Common Spacecraft/Instruments, paragraph 10.11, were met with the exceptions of the test methods CE03, RE01, and RE02, as described in this document.
Decentralizing the Team Station: Simulation before Reality as a Best-Practice Approach.
Charko, Jackie; Geertsen, Alice; O'Brien, Patrick; Rouse, Wendy; Shahid, Ammarah; Hardenne, Denise
2016-01-01
The purpose of this article is to share the logistical planning requirements and simulation experience of one Canadian hospital as it prepared its staff for the change from a centralized inpatient unit model to the decentralized design planned for its new community hospital. With the commitment and support of senior leadership, project management resources and clinical leads worked collaboratively to design a decentralized prototype in the form of a pod-style environment in the hospital's current setting. Critical success factors included engaging the right stakeholders, providing an opportunity to test new workflows and technology, creating a strong communication plan and building on lessons learned as subsequent pod prototypes are launched.
NASA Processes and Requirements for Conducting Human-in-the-Loop Closed Chamber Tests
NASA Technical Reports Server (NTRS)
Barta, Daniel J.; Montz, Michael E.
2004-01-01
NASA has specific processes and requirements that must be followed for tests involving human subjects to be conducted in a safe and effective manner. There are five distinct phases of test operations. Phase one, the test request phase, consists of those activities related to initiating, processing, reviewing, and evaluating the test request. Phase two, the test preparation phase consists of those activities related to planning, coordinating, documenting, and building up the test. Phase three, the test readiness phase consists of those activities related to verifying and reviewing the planned test operations. Phase four, the test activity phase, consists of all pretest operations, functional checkouts, emergency drills, and test operations. Phase five, the post test activity phase, consists of those activities performed once the test is completed, including briefings, documentation of anomalies, data reduction and archiving, and reporting. Project management processes must be followed for facility modifications and major test buildup, which include six phases: initiation and assessment, requirements evaluation, preliminary design, detailed design, use readiness review (URR) and acceptance. Compliance with requirements for safety and quality assurance are documented throughout the test buildup and test operation processes. Tests involving human subjects must be reviewed by the applicable Institutional Review Board (IRB).
NASA Technical Reports Server (NTRS)
Raje, S.; Mcknight, J.; Willoughby, G.; Economy, R. (Principal Investigator)
1974-01-01
The author has identified the following significant results. The County of Los Angeles photointerpreted ERTS film products to define problems of interest, coordinated ground truth over the complex test site including interfaces with secondary users as well as participated in on-line analyses of the GE multispectral information extraction systems. Interactive machine analyses were carried out, developing techniques and procedures as well as evaluating the outputs for community and regional planning. Extensive aircraft underflight coverage was provided that was valuable both in inputs preparation and outputs evaluation of the machine-aided analyses. One of the nonstandard ERTS images led to the discovery of a major new fault lineament on the northern slope of the Santa Monica Mountains.
Investigation of cloud properties and atmospheric stability with MODIS
NASA Technical Reports Server (NTRS)
Menzel, P.; Ackerman, S.; Moeller, C.; Gumley, L.; Strabala, K.; Frey, R.; Prins, E.; LaPorte, D.; Lynch, M.
1996-01-01
The last half year was spent in preparing Version 1 software for delivery, and culminated in transfer of the Level 2 cloud mask production software to the SDST in April. A simulated MODIS test data set with good radiometric integrity was produced using MAS data for a clear ocean scene. ER-2 flight support and MAS data processing were provided by CIMSS personnel during the Apr-May 96 SUCCESS field campaign in Salina, Kansas. Improvements have been made in the absolute calibration of the MAS, including better characterization of the spectral response for all 50 channels. Plans were laid out for validating and testing the MODIS calibration techniques; these plans were further refined during a UW calibration meeting with MCST.
Research and technology goals and objectives for Integrated Vehicle Health Management (IVHM)
NASA Technical Reports Server (NTRS)
1992-01-01
Integrated Vehicle Health Management (IVHM) is defined herein as the capability to efficiently perform checkout, testing, and monitoring of space transportation vehicles, subsystems, and components before, during, and after operational This includes the ability to perform timely status determination, diagnostics, and prognostics. IVHM must support fault-tolerant response including system/subsystem reconfiguration to prevent catastrophic failures; and IVHM must support the planning and scheduling of post-operational maintenance. The purpose of this document is to establish the rationale for IVHM and IVHM research and technology planning, and to develop technical goals and objectives. This document is prepared to provide a broad overview of IVHM for technology and advanced development activities and, more specifically, to provide a planning reference from an avionics viewpoint under the OAST Transportation Technology Program Strategic Plan.
Report planning, preparation and review guide
Moore, J.E.; Aronson, D.A.; Green, J.H.; Puente, Celso
1990-01-01
The guide describes critical steps in the planning, preparation, and review of hydrologic projects and reports. Project and report planning and organization are discussed first. Report writing and guidelines for writing selected parts of the report are covered next. The last topics covered are editorial and technical review. The guide contains examples of good and poor writing, report checklists, and source references to assist authors in the various stages of report preparation.
Kassim, Sameer S; McGowan, Yvonne; McGee, Hannah; Whitford, David L
2016-02-09
Graduating medical students enter the workforce with substantial medical knowledge and experience, yet little is known about how well they are prepared for the transition to medical practice in diverse settings. We set out to compare perceptions of medical school graduates' career guidance with their perceptions of preparedness to practice as interns. We also set out to compare perceptions of preparedness for hospital practice between graduates from two transnational medical schools. This was a cross-sectional study. A Preparedness for Hospital Practice (PHPQ) survey and career guidance questionnaire was sent to recent medical graduates, incorporating additional free text responses on career preparation. Data was analyzed using descriptive statistics and tests of association including Chi-square, Mann-Whitney U and Kruskal-Wallis H tests. Forty three percent (240/555) of graduates responded to the survey: 39 % of respondents were domestic (Dublin, Ireland or Manama, Kingdom of Bahrain) and interning locally; 15 % were overseas students interning locally; 42 % were overseas students interning internationally and 4 % had not started internship. Two variables explained 13 % of the variation in preparedness for hospital practice score: having planned postgraduate education prior to entering medical school and having helpful career guidance in medical school. Overseas graduates interning internationally were more likely to have planned their postgraduate career path prior to entering medical school. Dublin graduates found their career guidance more helpful than Bahrain counterparts. The most cited shortcomings were lack of structured career advice and lack of advice on the Irish and Bahraini postgraduate systems. This study has demonstrated that early consideration of postgraduate career preparation and helpful medical school career guidance has a strong association with perceptions of preparedness of medical graduates for hospital practice. In an era of increasing globalization of medical education, these findings can direct ongoing efforts to ensure all medical students receive career guidance and preparation for internship appropriate to their destination.
Pressure vessel burst test program - Initial program paper
NASA Technical Reports Server (NTRS)
Cain, Maurice R.; Sharp, Douglas E.; Coleman, Michael D.; Webb, Bobby L.
1990-01-01
The current status of a pressure vessel burst test program, aimed at the study of the blast waves and fragmentation characteristics of ruptured gas-filled pressure vessels, is reported. The program includes a series of test plans, each involving multiple bursts with burst pressures ranging to 7500 psig. The discussion covers the identification of concerns and hazards, application of the data generated, and a brief review of the current methods for assessing vessel safety and burst parameters. Attention is also given to pretest activities, including completed vessel and facility/instrumentation preparation and results of completed preliminary burst tests.
Bugen's Coping with Death Scale: Reliability and Further Validation.
ERIC Educational Resources Information Center
Robbins, Rosemary A.
1991-01-01
Tested Bugen's Coping with Death Scale. Individuals who had written wills, planned estates and funerals, and signed organ donor cards scored higher on the Coping with Death Scale. Because Coping with Death scores were more consistently different in those who prepared for death, this scale may help in efforts to predict those who will engage in…
Guidance for Preparing a Facility Plan. Revised Edition.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Water Programs.
This document provides information to assist with preparing a preliminary facility plan for construction of municipal sewage treatment works. The text describes the requirements in the applicable laws and regulations and suggests a planning process by which they can be met. (CS)
Preparing for possible motor fuel shortages: a community planning guide, Roswell, New Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This guide is prepared to provide a practical approach for the community of Roswell, New Mexico, to respond to fuel supply disruptions. It contains: overviews highlighting fuel supplies and government roles in emergency transportation planning; factors in contingency planning which include community profiles, needs, resources, and constraints; and the local emergency planning process. (MHR)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-28
... recovery of Cook Inlet belugas, which are listed as endangered under the ESA. The recovery planning process... effort to expedite the recovery plan process, NMFS will work towards incorporating relevant portions of... and Threatened Species: Notice of Intent to Prepare a Recovery Plan for Cook Inlet Beluga Whales...
Intelligent Engine Systems: Bearing System
NASA Technical Reports Server (NTRS)
Singh, Arnant P.
2008-01-01
The overall requirements necessary for sensing bearing distress and the related criteria to select a particular rotating sensor were established during the phase I. The current phase II efforts performed studies to evaluate the Robustness and Durability Enhancement of the rotating sensors, and to design, and develop the Built-in Telemetry System concepts for an aircraft engine differential sump. A generic test vehicle that can test the proposed bearing diagnostic system was designed, developed, and built. The Timken Company, who also assisted with testing the GE concept of using rotating sensors for the differential bearing diagnostics during previous phase, was selected as a subcontractor to assist General Electric (GE) for the design, and procurement of the test vehicle. A purchase order was prepared to define the different sub-tasks, and deliverables for this task. The University of Akron was selected to provide the necessary support for installing, and integrating the test vehicle with their newly designed test facility capable of simulating the operating environment for the planned testing. The planned testing with good and damaged bearings will be on hold pending further continuation of this effort during next phase.
Enock, K E; Jacobs, J
2008-11-01
To undertake a review of the literature relating to public health planning and interventions at previous summer Olympic and Paralympic Games and other relevant major summer sporting events or mass gatherings, with a focus on official publications and peer-reviewed articles. Literature review. A literature review was undertaken using all biomedical databases and a freetext search using Google to widen the search beyond peer-reviewed publications. Search terms used were: Olympics; Paralympics; mass gatherings; mass gathering medicine; sporting events; weather; planning; and organisation. Citations within articles were searched to identify additional references that would inform this review. This literature review concentrates on the public health aspects of population care at mass gatherings, particularly the Olympic and Paralympic Games which are set over several weeks, focusing on surveillance, prevention and health service quality. The literature identified 10 areas of public health planning: public health command centre and communication; surveillance, assessment and control; environmental health and safety; infectious disease outbreaks; implications of weather conditions; health promotion; travel information; economic assessments; public transport and reduction of asthma events; and preparing athletes for potential allergies. The following themes emerged as crucial factors for the success of any public health interventions at Olympic and Paralympic Games: detailed planning of deliverables; pre-identification of critical success factors; management of risk; detailed contingency planning; and full testing of all plans prior to the event. The 2012 Olympic Games will provide an exciting challenge for public health providers and systems. Preparation requires early detailed planning of policies, procedures and on-site health promotion events, in addition to helping to set up the surveillance and monitoring systems that will capture public health activity alongside medical activity. Learning from the literature review will support the identification of critical success factors and help to formulate recommendations that will allow optimal utilization of public health initiatives. All plans require full costings in advance which are supported by internal and external health-related agencies, voluntary organizations and sponsors. A risk assessment should be undertaken as part of the planning process leading to risk management plans for mitigating identified potential risks. All surveillance and monitoring systems, communication, policies and procedures will require full testing prior to commencement of the Games.
Advanced on-site power plant development technology program
NASA Technical Reports Server (NTRS)
Kemp, F. S.
1985-01-01
A 30-cell stack was tested for 7200 hours. At 6000 hours the stack was successfully refilled with acid with no loss of performance. A second stack containing the advanced Configuration B cell package was fabricated and assembled for testing in 1985. A 200-kW brassboard inverter was successfully evaluated, verifying the design of the two-bridge ASCR circuit design. A fuel processing catalyst train was tested for 2000 hours verifying the catalyst for use in a 200-kW development reformer. The development reformer was fabricated for evaluation in 1985. The initial test plan was prepared for a 200-kW verification test article.
ERIC Educational Resources Information Center
Cheney, Carl K.
The steps which should be followed in planning, preparing, and giving a presentation are: (1) start planning immediately; (2) establish realistic objectives emphasizing desired results; (3) analyze the audience and the context of the presentation; (4) prepare a preliminary plan to help in selecting and organizing material including topic,…
44 CFR 334.5 - GMR system description.
Code of Federal Regulations, 2010 CFR
2010-10-01
... more levels as suits its needs. (a) Stage 3, Planning and Preparation. During the planning and preparation stage, Federal departments and agencies develop their GMR plans and maintain capability to carry... departments and agencies may need to gather additional data on selected resources or increase their...
Spacecraft servicing demonstration plan
NASA Technical Reports Server (NTRS)
Bergonz, F. H.; Bulboaca, M. A.; Derocher, W. L., Jr.
1984-01-01
A preliminary spacecraft servicing demonstration plan is prepared which leads to a fully verified operational on-orbit servicing system based on the module exchange, refueling, and resupply technologies. The resulting system can be applied at the space station, in low Earth orbit with an orbital maneuvering vehicle (OMV), or be carried with an OMV to geosynchronous orbit by an orbital transfer vehicle. The three phase plan includes ground demonstrations, cargo bay demonstrations, and free flight verifications. The plan emphasizes the exchange of multimission modular spacecraft (MMS) modules which involves space repairable satellites. Three servicer mechanism configurations are the engineering test unit, a protoflight quality unit, and two fully operational units that have been qualified and documented for use in free flight verification activity. The plan balances costs and risks by overlapping study phases, utilizing existing equipment for ground demonstrations, maximizing use of existing MMS equipment, and rental of a spacecraft bus.
Looking for trouble: revenge-planning and preattentive vigilance for angry facial expressions.
Crowe, Sarah E; Wilkowski, Benjamin M
2013-08-01
Revenge-planning refers to individual differences in the tendency to actively seek out hostile confrontations with others. Building on past theory, we hypothesized that revenge-planning would be related to preattentive vigilance for angry facial expressions. By being vigilant for such expressions, individuals could more readily notice and prepare to confront social challenges. We conducted 2 studies to test this prediction. Across studies, results indicated that participants high in revenge-planning had significantly longer color-naming latencies for masked angry expressions presented in a subliminal Stroop task, regardless of whether the expression was presented inside or outside participants' attentional focus. This phenomenon was specific to revenge-planning and did not extend to the related construct of angry rumination. Such results suggest that preattentive vigilance for angry expressions supports a confrontational social style in which a person actively seeks out hostile social encounters. PsycINFO Database Record (c) 2013 APA, all rights reserved.
Hanford Waste End Effector Phase I Test Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berglin, Eric J.; Hatchell, Brian K.; Mount, Jason C.
This test plan describes the Phase 1 testing program of the Hanford Waste End Effector (HWEE) at the Washington River Protection Solutions’ Cold Test Facility (CTF) using a Pacific Northwest National Laboratory (PNNL)-designed testing setup. This effort fulfills the informational needs for initial assessment of the HWEE to support Hanford single-shell tank A-105 retrieval. This task will install the HWEE on a PNNL-designed robotic gantry system at CTF, install and calibrate instrumentation to measure reaction forces and process parameters, prepare and characterize simulant materials, and implement the test program. The tests will involve retrieval of water, sludge, and hardpan simulantsmore » to determine pumping rate, dilution factors, and screen fouling rate.« less
SEM evaluation of metallization on semiconductors. [Scanning Electron Microscope
NASA Technical Reports Server (NTRS)
Fresh, D. L.; Adolphsen, J. W.
1974-01-01
A test method for the evaluation of metallization on semiconductors is presented and discussed. The method has been prepared in MIL-STD format for submittal as a proposed addition to MIL-STD-883. It is applicable to discrete devices and to integrated circuits and specifically addresses batch-process oriented defects. Quantitative accept/reject criteria are given for contact windows, other oxide steps, and general interconnecting metallization. Figures are provided that illustrate typical types of defects. Apparatus specifications, sampling plans, and specimen preparation and examination requirements are described. Procedures for glassivated devices and for multi-metal interconnection systems are included.
2015-11-01
collected. We determined that the methodologies were valid and the data were reliable for our purposes. In addition, we interviewed DOD officials and...of contracts and cost of labor involved in preparing program documentation, to arrive at the estimates for savings. To validate the data used in the...studies to be reasonable, and the data were sufficiently reliable for our purposes. We interviewed officials from DOD and 5 of the 12 Test Program
NASA Astrophysics Data System (ADS)
Romney, C.; Huszar, L.; Frazier, G. A.; Campanella, A.; Tiberio, M. A.
1986-01-01
This report covers preparations for and the conduct of an international seismic data exchange experiment sponsored by the Group of Scientific Experts, U.N. Conference on Disarmament. Seismic data reports from 37 countries were transmitted over circuits of the WMO/GTS. The data were analyzed at centers in Washington, Moscow and Stockholm and epicenter lists were broadcast to participants. The experiment tested a number of aspects of a proposed nuclear test monitoring system.
Kauai Test Facility hazards assessment document
DOE Office of Scientific and Technical Information (OSTI.GOV)
Swihart, A
1995-05-01
The Department of Energy Order 55003A requires facility-specific hazards assessment be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with the Kauai Test Facility, Barking Sands, Kauai, Hawaii. The Kauai Test Facility`s chemical and radiological inventories were screened according to potential airborne impact to onsite and offsite individuals. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distance to themore » Early Severe Health Effects threshold is 4.2 kilometers. The highest emergency classification is a General Emergency at the {open_quotes}Main Complex{close_quotes} and a Site Area Emergency at the Kokole Point Launch Site. The Emergency Planning Zone for the {open_quotes}Main Complex{close_quotes} is 5 kilometers. The Emergency Planning Zone for the Kokole Point Launch Site is the Pacific Missile Range Facility`s site boundary.« less
How Do Women Who Plan Home Birth Prepare for Childbirth?
Lothian, Judith A.
2010-01-01
In this column, the findings of a secondary analysis of data from a larger qualitative study of the experience of home birth are discussed. The aim was to describe the ways in which women who plan home birth prepare for their births. The findings provide support for the idea of birth preparation and education occurring throughout pregnancy and describe the ways in which women planning to give birth at home develop confidence, plan for support, and make decisions related to the particulars of the labor and birth. Implications of these findings for childbirth education are explored. PMID:21629387
Koenen, F; Uttenthal, A; Meindl-Böhmer, A
2007-12-01
In order to adequately and efficiently handle outbreaks of contagious diseases such as classical swine fever (CSF), foot and mouth disease or highly pathogenic avian influenza, competent authorities and the laboratories involved have to be well prepared and must be in possession of functioning contingency plans. These plans should ensure that in the event of an outbreak access to facilities, equipment, resources, trained personnel, and all other facilities needed for the rapid and efficient eradication of the outbreak is guaranteed, and that the procedures to follow are well rehearsed. It is essential that these plans are established during 'peace-time' and are reviewed regularly. This paper provides suggestions on how to perform laboratory exercises to test preparedness and describes the experiences of two national reference laboratories for CSF. The major lesson learnt was the importance of a well-documented laboratory contingency plan. The major pitfalls encountered were shortage of space, difficulties in guaranteeing biosecurity and sufficient supplies of sterile equipment and consumables. The need for a standardised laboratory information management system, that is used by all those involved in order to reduce the administrative load, is also discussed.
Using Business Plans for Teaching Entrepreneurship
ERIC Educational Resources Information Center
Zimmerman, John
2012-01-01
Many educators use the preparation of a Business Plan as a culminating assignment in entrepreneurship courses. Additionally, a number of institutions and organizations conduct business plan competitions to further entrepreneurship education. The objective for both of these exercises is to prepare student entrepreneurs for the challenging task of…
25 CFR 273.14 - Preparing the education plan.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Preparing the education plan. 273.14 Section 273.14 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.14 Preparing...
25 CFR 273.14 - Preparing the education plan.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Preparing the education plan. 273.14 Section 273.14 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.14 Preparing...
25 CFR 273.14 - Preparing the education plan.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Preparing the education plan. 273.14 Section 273.14 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.14 Preparing...
25 CFR 273.14 - Preparing the education plan.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Preparing the education plan. 273.14 Section 273.14 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.14 Preparing...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-26
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Intent To Prepare an Environmental Impact Statement; US 41 Interstate Conversion Plan, Milwaukee, Waukesha, Washington, Dodge, Fond... Impact Statement (EIS) will be prepared for the proposed interstate conversion of U.S. Highway 41 in...
25 CFR 273.14 - Preparing the education plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Preparing the education plan. 273.14 Section 273.14 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.14 Preparing...
The Airborne Research Instrumentation Testing Opportunity (ARISTO)
NASA Astrophysics Data System (ADS)
Wolff, C.; Romashkin, P.; Lussier, L.; Baeuerle, B.; Stith, J. L.
2016-12-01
In 2015 the National Science Foundation (NSF) began a program to sponsor an annual flight campaign on one of its research aircraft (the C-130 and GV) operated by the National Center for Atmospheric Research (NCAR). The aircraft are managed by the Research Aviation Facility (RAF), which is part of the Earth Observing Laboratory (EOL) and responsible for planning and executing the campaigns. The purpose of this program, known as the Airborne Research Instrumentation Testing Opportunity or ARISTO, is to provide regular flight test opportunities for newly developed or highly modified instruments as part of their development effort. The NSF community has expressed a strong desire for regularly scheduled flight-testing programs to be able to test instrumentation, data systems, inlets, and software. ARISTO allows this testing in a low-pressure environment where any issues or problems will not affect the scientific goals of a large-scale field campaign. For this reason it is also a good experience for students who may be learning about the operation of an instrument or have not had previous exposure to a field project. They are also able to contribute to flight planning exercises and gain experience in acting as an instrument scientist during the program. A goal of the program is to incorporate students into the project operations to prepare the next generation of airborne researchers. ARISTO is conducted at the Research Aviation Facility at Rocky Mountain Metropolitan Airport in Broomfield, Colorado. The flight campaign consists of 20 flight hours, spread over three weeks. Flights are planned to allow the ARISTO participants to successfully test their instruments based on requirements they described in the initial application. Due to the limited hours most flights are focused in and around Colorado, though some have gone as far as Oklahoma and the Pacific Northwest to find the right conditions to meet testing requirements. Two ARISTO campaigns were successfully completed in 2015 and 2016, and a summary of these projects will be presented. Preparations for the 2017 campaign are underway, with flights scheduled to take place in February and March. The next ARISTO campaign is likely to occur in the summer of 2018, and details on the schedule and how to apply will be discussed.
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...
A Framework for Outreach Evaluation Plans
ERIC Educational Resources Information Center
Raven, Neil
2015-01-01
Much importance is now placed upon the evaluation of outreach interventions by higher education institutions (HEIs). Accompanying this focus are requests that HEIs prepare evaluation plans. Yet, whilst some now have plans in place, others do not. One of the challenges for those preparing such documents is that official guidance is not prescriptive…
Managerial Skills Needed by Office Support Workers.
ERIC Educational Resources Information Center
Luke, Cheryl M.
1985-01-01
Methods to help students develop the ability to plan, organize, and control are suggested. These include a simulation in which an office procedures class plans, organizes, and holds a meeting and involves such details as selecting and reserving rooms, scheduling speakers, preparing agendas, planning budgets, preparing name tags, and arranging a…
Mammalian Toxicology Testing: Problem Definition Study, Technical Plan.
1981-03-01
Acute Oral Exposure Area, Rzdent 2. Subchrcnic Oral Exposure Area, .odent 3. Chronic Oral Exposure Area, Rodent 4. Subchronic Oral Eposure Area, "og...Alarms Fire Extinguisher First Aid Fiscal Year Record Fixtures (See Jigs, Fixtures & Molds Control System) Food Preparation/Blending Forms Control...Insurance Invoicing (See Bookkeeping) Janitorial Service Jigs, Fixtures & Molds Control System Key Control System Keypunch Control System Label
2014-12-01
Aim 3: Secure FDA approval of a phase I/II clinical trial plan and obtain an amended IND in preparation for initiating human clinical testing in TBI...Neurology 6:193–201. Raineri M, Gonzalez B, Goitia B, Garcia-Rill E, Krasnova IN, Cadet JL, Urbano FJ, Bisagno V. 2012. Modafinil abrogates
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-08
..., Submission, and Negotiation of Subcontracting Plans; Correction AGENCY: General Services Administration (GSA..., Preparation, Submission, and Negotiation of Subcontracting Plans; Correction. Correction In the information...
SRB/SLEEC (Solid Rocket Booster/Shingle Lap Extendible Exit Cone) feasibility study, volume 1
NASA Technical Reports Server (NTRS)
Baker, William H., Jr.
1986-01-01
A preliminary design and analysis was completed for a SLEEC (Shingle Lap Extendible Exit Cone) which could be incorporated on the Space Transportation System (STS) Solid Rocket Booster (SRB). Studies were completed which predicted weights and performance increases and development plans were prepared for the full-scale bench and static test of SLEEC. In conjunction with the design studies, a series of supporting analyses were performed to assure the validity and feasibility of performance, fabrication, cost, and reliability for the selected design. The feasibility and required amounts of bench, static firing, and flight tests considered necessary for the successful incorporation of SLEEC on the Shuttle SRBs were determined. Preliminary plans were completed which define both a follow on study effort and a development program.
Thompson, Marcella R
2003-04-01
Fire safety is of paramount importance for everyone. In many workplaces, the occupational health nurse's scope of practice encompasses safety related activities. Included within this role is the responsibility for fire safety, emergency action, and fire prevention planning. The Three Rs of fire safety, emergency action, and fire prevention plans are rules, responsibilities, and resources. Myriad building and fire safety codes, regulations, and standards exist with which an employer must comply. An employer's responsibility for installing, testing, inspecting, and maintaining fire safety related equipment is extensive. Emergency action and fire prevention planning begins with conducting a detailed physical survey and preparing site maps. It includes making key policy decisions, writing procedures, and training employees in those procedures by practicing and executing site drills. The best resources available for emergency planning are the local fire department and the property insurer. Planning ahead means an efficient emergency response if disaster strikes. It saves lives, limits property damage, and preserves the environment.
Preparing the Mentally Retarded in the Areas of Food Preparation and Service.
ERIC Educational Resources Information Center
Mattson, Bruce D.; And Others
The report of a project for planning a training program for the mentally retarded in the areas of food preparation and service summarizes activities of the planning project and makes recommendations for possible implementation. The training program is designed for educable mentally retarded youth who would benefit from specific vocational…
jsc2017m000738_NASA Tests Orion Crew Egress_July 2017
2017-07-18
NASA Tests Orion Crew Exit Plans in Gulf of Mexico A NASA and Department of Defense team evaluated the techniques that will be used to make sure astronauts can exit Orion in a variety of scenarios upon splashdown after deep space missions, using the waters off the coast of Galveston, Texas, to test their procedures in July. The team used a mockup of the spacecraft to examine how crew will get out of Orion with assistance and alone. The testing is helping NASA prepare for Orion and Space Launch System missions with crew beginning with Exploration Mission-2 in the early 2020s.
Technology for advanced liquefaction processes: Coal/waste coprocessing studies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cugini, A.V.; Rothenberger, K.S.; Ciocco, M.V.
1995-12-31
The efforts in this project are directed toward three areas: (1) novel catalyst (supported and unsupported) research and development, (2) study and optimization of major operating parameters (specifically pressure), and (3) coal/waste coprocessing. The novel catalyst research and development activity has involved testing supported catalysts, dispersed catalysts, and use of catalyst testing units to investigate the effects of operating parameters (the second area) with both supported and unsupported catalysts. Several supported catalysts were tested in a simulated first stage coal liquefaction application at 404{degrees}C during this performance period. A Ni-Mo hydrous titanate catalyst on an Amocat support prepared by Sandiamore » National laboratories was tested. Other baseline experiments using AO-60 and Amocat, both Ni-Mo/Al{sub 2}O{sub 3} supported catalysts, were also made. These experiments were short duration (approximately 12 days) and monitored the initial activity of the catalysts. The results of these tests indicate that the Sandia catalyst performed as well as the commercially prepared catalysts. Future tests are planned with other Sandia preparations. The dispersed catalysts tested include sulfated iron oxide, Bayferrox iron oxide (iron oxide from Miles, Inc.), and Bailey iron oxide (micronized iron oxide from Bailey, Inc.). The effects of space velocity, temperature, and solvent-to-coal ratio on coal liquefaction activity with the dispersed catalysts were investigated. A comparison of the coal liquefaction activity of these catalysts relative to iron catalysts tested earlier, including FeOOH-impregnated coal, was made. These studies are discussed.« less
How to Analyze Routines in Teachers' Thinking Processes during Lesson Planning.
ERIC Educational Resources Information Center
Bromme, Rainer
A justification for the study of teachers' routines, as they affect the preparation of lesson plans, prefaces this paper on teachers' thought processes during lesson planning. In focusing on the importance of research into teachers' routines, it is pointed out that lesson preparation and classroom routines permit teachers to direct attention to…
University Strategic Planning: A Process for Change in a Principal Preparation Program
ERIC Educational Resources Information Center
Guerra, Federico R.; Zamora, Roberto; Hernandez, Rosalinda; Menchaca, Velma
2017-01-01
This study describes a strategic planning process used for developing an educational leadership program that prepares principals for leading 21st century schools. The plan is based on recommendations received from the External reviewers representing Southern Association of Colleges and Schools, the Texas Education Agency, survey responses received…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-27
... to this initial phase of developing the general management plan/wilderness study/environmental impact... DEPARTMENT OF THE INTERIOR National Park Service Notice of Intent to Prepare an Environmental Impact Statement for a General Management Plan Amendment/Wilderness Study, for Gates of the Arctic...
40 CFR 1068.510 - How do I prepare and apply my remedial plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
...) AIR POLLUTION CONTROLS GENERAL COMPLIANCE PROVISIONS FOR ENGINE PROGRAMS Reporting Defects and Recalling Engines/Equipment § 1068.510 How do I prepare and apply my remedial plan? (a) In your remedial plan, describe all of the following: (1) The class or category of engines/equipment to be recalled...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
... Oklahoma Resource Management Plan, as amended, and associated Environmental Assessment (EA) in response to... Intent To Prepare a Resource Management Plan Amendment (RMPA) and Associated Environmental Assessment Addressing Four Federal Coal Lease Applications in Haskell and LeFlore Counties, OK AGENCY: Bureau of Land...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
... Resource Management Plans for Puget Sound Hatchery Programs and Reopening of Comment Period AGENCY... prepare an Environmental Impact Statement (EIS) for two hatchery Resource Management Plans and appended Hatchery and Genetic Management Plans (HGMPs) jointly proposed by the Washington Department of Fish and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-25
... and Threatened Species; Notice of Intent To Prepare a Recovery Plan for Oregon Coast Coho Salmon... Oregon Coast coho salmon (Oncorhynchus kisutch) Evolutionarily Significant Unit (ESU) (OC coho) and... which can be accessed at http://www.nwr.noaa.gov/protected_species/salmon_steelhead/recovery_planning...
A Sensemaking Visualization Tool with Military Doctrinal Elements
2008-06-01
LeadUnderstand CDR / Staff ART / Science In short, we need to develop an integrated approach for the understanding (framing) and visualizing, describing...directing, assessing, and reframing of unified operations. Staff Running Estimates t ff i i Visualize CDR / Staff ART / Science •Planning guidance...Planning guidance •Cdr ’s Intent Describe CDR / Staff ART / Science •Plans & Orders •Preparation •Plans & Orders •Preparation •Execution WF
ERIC Educational Resources Information Center
Thompson, John A.; Chock, Mona K.O.
Part of a 13-volume series designed to be used as a group inservice or a self-learning system to train school administrators and counselors for their role in career education, this first section (4.1) of module 4 (Planning) is designed to assist principals and other school administrators to develop plans for curriculum preparation and infusion of…
ERIC Educational Resources Information Center
Sargent, Dennis J.; Chambers, Maynard N.
Designed as an aid for those investigating the possibility of opening their first business, as well as business owners with many years experience who have never prepared a written business plan, this workbook guides the reader through the steps involved in the preparation of a business plan or feasibility study. After a general discussion of the…
[Attitudes and habits of Canadians in relation to planning and preparing meals at home].
Aubé, Julie; Marquis, Marie
2011-01-01
To describe the attitudes and habits of Canadians in relation to planning and preparing meals at home, in order to identify motivations that can be used to promote home cooking. An electronic survey consisting of 39 multiple-choice questions was posted on the Dietitians of Canada website between November 16 and December 22, 2006. The statements analyzed have to do with perceived benefits associated with home cooking, obstacles preventing people from cooking, preparation time and meal planning, learning to cook, and sources of recipe ideas. A total of 4,080 people filled out the questionnaire. Although they believe that home cooking can improve diet quality and eating behaviours, respondents experience several obstacles relating to day-to-day food preparation. Among these are lack of time, energy, ideas, and planning. This study underlines the relevance of creating strategies not only for educating consumers about the benefits of home cooking, but also for providing practical information to help them overcome obstacles limiting the day-to-day preparation of food.
NASA Technical Reports Server (NTRS)
Chien, Steve; Kandt, R. Kirk; Roden, Joseph; Burleigh, Scott; King, Todd; Joy, Steve
1992-01-01
Scientific data preparation is the process of extracting usable scientific data from raw instrument data. This task involves noise detection (and subsequent noise classification and flagging or removal), extracting data from compressed forms, and construction of derivative or aggregate data (e.g. spectral densities or running averages). A software system called PIPE provides intelligent assistance to users developing scientific data preparation plans using a programming language called Master Plumber. PIPE provides this assistance capability by using a process description to create a dependency model of the scientific data preparation plan. This dependency model can then be used to verify syntactic and semantic constraints on processing steps to perform limited plan validation. PIPE also provides capabilities for using this model to assist in debugging faulty data preparation plans. In this case, the process model is used to focus the developer's attention upon those processing steps and data elements that were used in computing the faulty output values. Finally, the dependency model of a plan can be used to perform plan optimization and runtime estimation. These capabilities allow scientists to spend less time developing data preparation procedures and more time on scientific analysis tasks. Because the scientific data processing modules (called fittings) evolve to match scientists' needs, issues regarding maintainability are of prime importance in PIPE. This paper describes the PIPE system and describes how issues in maintainability affected the knowledge representation used in PIPE to capture knowledge about the behavior of fittings.
Dosimetric verification of radiotherapy treatment planning systems in Serbia: national audit
2012-01-01
Background Independent external audits play an important role in quality assurance programme in radiation oncology. The audit supported by the IAEA in Serbia was designed to review the whole chain of activities in 3D conformal radiotherapy (3D-CRT) workflow, from patient data acquisition to treatment planning and dose delivery. The audit was based on the IAEA recommendations and focused on dosimetry part of the treatment planning and delivery processes. Methods The audit was conducted in three radiotherapy departments of Serbia. An anthropomorphic phantom was scanned with a computed tomography unit (CT) and treatment plans for eight different test cases involving various beam configurations suggested by the IAEA were prepared on local treatment planning systems (TPSs). The phantom was irradiated following the treatment plans for these test cases and doses in specific points were measured with an ionization chamber. The differences between the measured and calculated doses were reported. Results The measurements were conducted for different photon beam energies and TPS calculation algorithms. The deviation between the measured and calculated values for all test cases made with advanced algorithms were within the agreement criteria, while the larger deviations were observed for simpler algorithms. The number of measurements with results outside the agreement criteria increased with the increase of the beam energy and decreased with TPS calculation algorithm sophistication. Also, a few errors in the basic dosimetry data in TPS were detected and corrected. Conclusions The audit helped the users to better understand the operational features and limitations of their TPSs and resulted in increased confidence in dose calculation accuracy using TPSs. The audit results indicated the shortcomings of simpler algorithms for the test cases performed and, therefore the transition to more advanced algorithms is highly desirable. PMID:22971539
Dosimetric verification of radiotherapy treatment planning systems in Serbia: national audit.
Rutonjski, Laza; Petrović, Borislava; Baucal, Milutin; Teodorović, Milan; Cudić, Ozren; Gershkevitsh, Eduard; Izewska, Joanna
2012-09-12
Independent external audits play an important role in quality assurance programme in radiation oncology. The audit supported by the IAEA in Serbia was designed to review the whole chain of activities in 3D conformal radiotherapy (3D-CRT) workflow, from patient data acquisition to treatment planning and dose delivery. The audit was based on the IAEA recommendations and focused on dosimetry part of the treatment planning and delivery processes. The audit was conducted in three radiotherapy departments of Serbia. An anthropomorphic phantom was scanned with a computed tomography unit (CT) and treatment plans for eight different test cases involving various beam configurations suggested by the IAEA were prepared on local treatment planning systems (TPSs). The phantom was irradiated following the treatment plans for these test cases and doses in specific points were measured with an ionization chamber. The differences between the measured and calculated doses were reported. The measurements were conducted for different photon beam energies and TPS calculation algorithms. The deviation between the measured and calculated values for all test cases made with advanced algorithms were within the agreement criteria, while the larger deviations were observed for simpler algorithms. The number of measurements with results outside the agreement criteria increased with the increase of the beam energy and decreased with TPS calculation algorithm sophistication. Also, a few errors in the basic dosimetry data in TPS were detected and corrected. The audit helped the users to better understand the operational features and limitations of their TPSs and resulted in increased confidence in dose calculation accuracy using TPSs. The audit results indicated the shortcomings of simpler algorithms for the test cases performed and, therefore the transition to more advanced algorithms is highly desirable.
Apes produce tools for future use.
Bräuer, Juliane; Call, Josep
2015-03-01
There is now growing evidence that some animal species are able to plan for the future. For example great apes save and exchange tools for future use. Here we raise the question whether chimpanzees, orangutans, and bonobos would produce tools for future use. Subjects only had access to a baited apparatus for a limited duration and therefore should use the time preceding this access to create the appropriate tools in order to get the rewards. The apes were tested in three conditions depending on the need for pre-prepared tools. Either eight tools, one tool or no tools were needed to retrieve the reward. The apes prepared tools in advance for future use and they produced them mainly in conditions when they were really needed. The fact that apes were able to solve this new task indicates that their planning skills are flexible. However, for the condition in which eight tools were needed, apes produced less than two tools per trial in advance. However, they used their chance to produce additional tools in the tool use phase-thus often obtaining most of the reward from the apparatus. Increased pressure to prepare more tools in advance did not have an effect on their performance. © 2014 Wiley Periodicals, Inc.
A New Path Forward: Four Approaches to Quality Teaching and Better Schools
ERIC Educational Resources Information Center
Weingarten, Randi
2010-01-01
In a global knowledge economy, filling in the bubbles on a standardized test isn't going to prepare children to succeed in life. This is the time to shed the old conflicts and come together. In this article, the author suggests a new path forward--toward a 21st-century education system, a serious and comprehensive reform plan to transform U.S.…
NASA Technical Reports Server (NTRS)
1976-01-01
The quality assurance program demonstrates recognition of the quality aspects and an organized approach to achieve them. It ensures that quality requirements are determined and satisfied throughout all phases of contract performance, including preliminary and engineering design, development, fabrication, processing, assembly, inspection, test, checkout, packaging, shipping, storage, maintenance field use, flight preparations, flight operations and post-flight analysis, as applicable.
Aircraft Mishap Exercise at SLF
2018-02-14
NASA Kennedy Space Center's Flight Operations prepares to rehearse a helicopter crash-landing to test new and updated emergency procedures. Called the Aircraft Mishap Preparedness and Contingency Plan, the operation was designed to validate several updated techniques the center's first responders would follow, should they ever need to rescue a crew in case of a real accident. The mishap exercise took place at the center's Shuttle Landing Facility.
The Soviet Physical Fitness Tests: An Essential Aspect of the Soviet Organizational Plan.
ERIC Educational Resources Information Center
Howell, Reet
This study analyzes the Soviet award system, in particular the Prepared for Word and Defense (PWD) program. The PWD program is composed of five stages and embraces people from ages 10 to 60. Each stage has a section of requirements and a section of norms, which take into consideration age variations. The norms section, which is the most important…
Manager's handbook for software development, revision 1
NASA Technical Reports Server (NTRS)
1990-01-01
Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences of the Software Engineering Laboratory (SEL) with flight dynamics software development. The management aspects of the following subjects are described: organizing the project, producing a development plan, estimating costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying.
ERIC Educational Resources Information Center
Turner, Steve
2008-01-01
Baking in the woods can be a lot of fun and can help to make a good trip an amazing one. It does take some time, planning, and preparation, and chosen recipes should be tested in the oven at home before trying them out with friends on a 10-day trip. Outdoor baking requires a different set of rules and equipment than those one uses at home and a…
ERIC Educational Resources Information Center
Butterfield, Sherri M.
The three units in this guide are designed to teach language, mathematics, and social studies skills associated with earning and managing money to students in grades 7-9. Each unit includes notes to aid the teacher in preparing and presenting the material, pre/post tests, and a series of one-page reproducible sheets which contain information or…
Preparing staff for intentional rounding: a process yielding success on a general surgical unit.
Patterson, Lisa M
2014-01-01
Intentional rounding is a strategicway to improve patient care through decreasing falls and hospital-acquired pressure ulcers, while increasing patient satisfaction. On the basis of literature reviews and discussions with nurses on units that pilot-tested intentional rounding, useful strategies emerged. This article will provide information about intentional rounding, a means for planning implementation, and the results of evaluating its implementation.
Shahabi, Sima; Chiniforush, Nasim; Bahramian, Hoda; Monzavi, Abbas; Baghalian, Ali; Kharazifard, Mohammad Javad
2013-01-01
The purpose of this study was to evaluate the effect of Er:YAG and Er,Cr:YSGG laser on tensile bond strength of composite resin to dentine in comparison with bur-prepared cavities. Fifteen extracted caries-free human third molars were selected. The teeth were cut at a level below the occlusal pit and fissure plan and randomly divided into three groups. Five cavities were prepared by diamond bur, five cavities prepared by Er:YAG laser, and the other group prepared by Er,Cr:YSGG laser. Then, all the cavities were restored by composite resin. The teeth were sectioned longitudinally with Isomet and the specimens prepared in dumbbelled shape (n = 36). The samples were attached to special jigs, and the tensile bond strength of the three groups was measured by universal testing machine at a speed of 0.5 mm/min. The results of the three groups were analyzed with one-way ANOVA and Tamhane test. The means and standard deviations of tensile bond strength of bur-cut, Er:YAG laser-ablated, and Er,Cr:YSGG laser-ablated dentine were 5.04 ± 0.93, 13.37 ± 3.87, and 4.85 ± 0.93 MPa, respectively. There is little difference in tensile bond strength of composite resin in Er,Cr:YSGG lased-prepared cavities in comparison with bur-prepared cavities, but the Er:YAG laser group showed higher bond strength than the other groups.
Heart Valve Surgery Recovery and Follow Up
... Winning Recovery Plan Post Surgery Milestones • Personal Stories Video: Preparing For Your Surgery Find helpful tips from ... how to plan and prepare for your surgery. Video: Recovering From Your Surgery Find helpful tips from ...
A Chief Engineer's View of the NASA X-43A Scramjet Flight Test
NASA Technical Reports Server (NTRS)
Marshall, Laurie A.; Corpening, Griffin P.; Sherrill, Robert
2005-01-01
This paper presents an overview of the preparation and execution of the first two flights of the NASA X-43A scramjet flight test project. The project consisted of three flights, two planned for Mach 7 and one for Mach 10. The first flight, conducted on June 2, 2001, was unsuccessful and resulted in a nine-month mishap investigation. A two-year return to flight effort ensued and concluded when the second Mach 7 flight was successfully conducted on March 27, 2004. The challenges faced by the project team as they prepared the first ever scramjet-powered airplane for flight are presented. Modifications made to the second flight vehicle as a result of the first flight failure and the return to flight activities are discussed. Flight results and lessons learned are also presented.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-09
... adaptive management principles; and 18. The Economic Profile System will be used as one source of... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNMP01000 L16100000 DO0000] Notice of Intent To Prepare a Resource Management Plan Amendment to the Roswell Resource Management Plan for the...
ERIC Educational Resources Information Center
Greiman, Bradley C.; Bedtke, Mary Anne
2008-01-01
Instructional planning is a curricular topic in teacher preparation programs, but limited research in agricultural education has been conducted in this area. The purpose of this study was to examine aspects of the instructional planning process that are taught to agricultural education preservice teachers. Survey research and content analysis of…
2012-06-29
CAPE CANAVERAL, Fla. - Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, technicians prepare a lifting ring to support the arrival of the Orion crew module. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. NASA's Michoud Assembly Facility in New Orleans built the crew module pressure vessel. The Orion production team will prepare the module for flight by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Gianni Woods
2012-06-28
CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, workers inside the Operations and Checkout Building high bay prepare to lift the Orion crew module, secured inside the transportation container at left. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. NASA's Michoud Assembly Facility in New Orleans built the crew module pressure vessel. The Orion production team will prepare the module for flight by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Charisse Nahser
The Process of Sensemaking in Complex Human Endeavors
2008-06-01
encompassing Joint, Interagency, and Multinational capabilities. The Art and Science of Battle Command LeadUnderstand CDR / Staff ART / Science In short, we...operations. Staff Running Estimates t ff i i Visualize CDR / Staff ART / Science •Planning guidance •Planning guidance •Cdr ’s Intent Describe CDR...Staff ART / Science •Plans & Orders •Preparation •Plans & Orders •Preparation •Execution WF • Intelligence •Maneuver •Fire Support • Protection
China Report: Science and Technology, No. 209. China Addresses Environmental Issues -- 1/83
1983-10-12
determines suc- cess or failure of a plan. The steps in planning can be divided into two stages , preparation and planning. The preparation stage ...Noise Control Legislation Requirements Surveyed (Wen Bobing; FAXUE YANJIU, No 6, 1982)........... 21 System of Two -Fines in...with constant improvement in economic results, it is necessary to adopt the two phase strategic plan of laying a good foundation in the first 10 years
ESO adaptive optics facility progress report
NASA Astrophysics Data System (ADS)
Arsenault, Robin; Madec, Pierre-Yves; Paufique, Jerome; La Penna, Paolo; Stroebele, Stefan; Vernet, Elise; Pirard, Jean-Francois; Hackenberg, Wolfgang; Kuntschner, Harald; Jochum, Lieselotte; Kolb, Johann; Muller, Nicolas; Le Louarn, Miska; Amico, Paola; Hubin, Norbert; Lizon, Jean-Louis; Ridings, Rob; Abad, Jose A.; Fischer, Gert; Heinz, Volker; Kiekebusch, Mario; Argomedo, Javier; Conzelmann, Ralf; Tordo, Sebastien; Donaldson, Robert; Soenke, Christian; Duhoux, Philippe; Fedrigo, Enrico; Delabre, Bernard; Jost, Andreas; Duchateau, Michel; Downing, Mark; Moreno, Javier R.; Dorn, Reinhold; Manescau, Antonio; Bonaccini Calia, Domenico; Quattri, Marco; Dupuy, Christophe; Guidolin, Ivan M.; Comin, Mauro; Guzman, Ronald; Buzzoni, Bernard; Quentin, Jutta; Lewis, Steffan; Jolley, Paul; Kraus, Maximilian; Pfrommer, Thomas; Biasi, Roberto; Gallieni, Daniele; Bechet, Clementine; Stuik, Remko
2012-07-01
The ESO Adaptive Optics Facility (AOF) consists in an evolution of one of the ESO VLT unit telescopes to a laser driven adaptive telescope with a deformable mirror in its optical train. The project has completed the procurement phase and several large structures have been delivered to Garching (Germany) and are being integrated (the AO modules GRAAL and GALACSI and the ASSIST test bench). The 4LGSF Laser (TOPTICA) has undergone final design review and a pre-production unit has been built and successfully tested. The Deformable Secondary Mirror is fully integrated and system tests have started with the first science grade thin shell mirror delivered by SAGEM. The integrated modules will be tested in stand-alone mode in 2012 and upon delivery of the DSM in late 2012, the system test phase will start. A commissioning strategy has been developed and will be updated before delivery to Paranal. A substantial effort has been spent in 2011-2012 to prepare the unit telescope to receive the AOF by preparing the mechanical interfaces and upgrading the cooling and electrical network. This preparation will also simplify the final installation of the facility on the telescope. A lot of attention is given to the system calibration, how to record and correct any misalignment and control the whole facility. A plan is being developed to efficiently operate the AOF after commissioning. This includes monitoring a relevant set of atmospheric parameters for scheduling and a Laser Traffic control system to assist the operator during the night and help/support the observing block preparation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garcia-Montero, Luis G., E-mail: luisgonzaga.garcia@upm.e; Lopez, Elena, E-mail: elopez@caminos.upm.e; Monzon, Andres, E-mail: amonzon@caminos.upm.e
Most Strategic Environmental Assessment (SEA) research has been concerned with SEA as a procedure, and there have been relatively few developments and tests of analytical methodologies. The first stage of the SEA is the 'screening', which is the process whereby a decision is taken on whether or not SEA is required for a particular programme or plan. The effectiveness of screening and SEA procedures will depend on how well the assessment fits into the planning from the early stages of the decision-making process. However, it is difficult to prepare the environmental screening for an infrastructure plan involving a whole country.more » To be useful, such methodologies must be fast and simple. We have developed two screening tools which would make it possible to estimate promptly the overall impact an infrastructure plan might have on biodiversity and global warming for a whole country, in order to generate planning alternatives, and to determine whether or not SEA is required for a particular infrastructure plan.« less
Landslide susceptibility map: from research to application
NASA Astrophysics Data System (ADS)
Fiorucci, Federica; Reichenbach, Paola; Ardizzone, Francesca; Rossi, Mauro; Felicioni, Giulia; Antonini, Guendalina
2014-05-01
Susceptibility map is an important and essential tool in environmental planning, to evaluate landslide hazard and risk and for a correct and responsible management of the territory. Landslide susceptibility is the likelihood of a landslide occurring in an area on the basis of local terrain conditions. Can be expressed as the probability that any given region will be affected by landslides, i.e. an estimate of "where" landslides are likely to occur. In this work we present two examples of landslide susceptibility map prepared for the Umbria Region and for the Perugia Municipality. These two maps were realized following official request from the Regional and Municipal government to the Research Institute for the Hydrogeological Protection (CNR-IRPI). The susceptibility map prepared for the Umbria Region represents the development of previous agreements focused to prepare: i) a landslide inventory map that was included in the Urban Territorial Planning (PUT) and ii) a series of maps for the Regional Plan for Multi-risk Prevention. The activities carried out for the Umbria Region were focused to define and apply methods and techniques for landslide susceptibility zonation. Susceptibility maps were prepared exploiting a multivariate statistical model (linear discriminant analysis) for the five Civil Protection Alert Zones defined in the regional territory. The five resulting maps were tested and validated using the spatial distribution of recent landslide events that occurred in the region. The susceptibility map for the Perugia Municipality was prepared to be integrated as one of the cartographic product in the Municipal development plan (PRG - Piano Regolatore Generale) as required by the existing legislation. At strategic level, one of the main objectives of the PRG, is to establish a framework of knowledge and legal aspects for the management of geo-hydrological risk. At national level most of the susceptibility maps prepared for the PRG, were and still are obtained qualitatively classifying the territory according to slope classes. For the Perugia Municipality the susceptibility map was obtained combining results of statistical multivariate models and landslide density map. In particular, in the first phase a susceptibility zonation was prepared using different single and combined probability statistical multivariate techniques. The zonation was then combined and compared with the landslide density map in order to reclassify the false negative (portion of the territory classified by the model as stable affected by slope failures). The semi-quantitative resulting map was classified in five susceptibility classes. For each class a set of technical regulation was established to manage the territory.
Motor planning flexibly optimizes performance under uncertainty about task goals.
Wong, Aaron L; Haith, Adrian M
2017-03-03
In an environment full of potential goals, how does the brain determine which movement to execute? Existing theories posit that the motor system prepares for all potential goals by generating several motor plans in parallel. One major line of evidence for such theories is that presenting two competing goals often results in a movement intermediate between them. These intermediate movements are thought to reflect an unintentional averaging of the competing plans. However, normative theories suggest instead that intermediate movements might actually be deliberate, generated because they improve task performance over a random guessing strategy. To test this hypothesis, we vary the benefit of making an intermediate movement by changing movement speed. We find that participants generate intermediate movements only at (slower) speeds where they measurably improve performance. Our findings support the normative view that the motor system selects only a single, flexible motor plan, optimized for uncertain goals.
Design and evaluation of a disaster preparedness logistics tool.
Neches, Robert; Ryutov, Tatyana; Kichkaylo, Tatiana; Burke, Rita V; Claudius, Ilene A; Upperman, Jeffrey S
2009-01-01
The purpose of this article is to describe the development and testing of the Pediatric Emergency Decision Support System (PEDSS), a dynamic tool for pediatric victim disaster planning. This is a descriptive article outlining an innovative automated approach to pediatric decision support and disaster planning. Disaster Resource Centers and umbrella hospitals in Los Angeles County. The authors use a model set of hypothetical patients for our pediatric disaster planning approach. The authors developed the PEDSS software to accomplish two goals: (a) core that supports user interaction and data management requirements (e.g., accessing demographic information about a healthcare facility's catchment area) and (b) set of modules each addressing a critical disaster preparation issue. The authors believe the PEDSS tool will help hospital disaster response personnel produce and maintain disaster response plans that apply best practice pediatric recommendations to their particular local conditions and requirements.
Aquatic toxicity of petroleum products and dispersant agents ...
The U.S. EPA Office of Research and Development has developed baseline data on the ecotoxicity of selected petroleum products and several chemical dispersants as part of its oil spills research program. Two diluted bitumens (dilbits) from the Alberta Tar Sands were tested for acute and chronic toxicity to standard freshwater and marine organisms given their spill potential during shipment within the United States. Separately, two reference crude oils representing a range of characteristics, and their mixtures with four representative dispersants, were tested to evaluate acute and chronic toxicity to marine organisms in support of Subpart J of the U.S. National Contingency Plan. Water accommodated fractions (WAF) of oil were prepared using traditional slow-stir methods and toxicity tests generally followed U.S. EPA standard effluent testing guidelines. WAFs were characterized for petroleum hydrocarbons including alkyl PAH homologs. The results of these studies will assist the U.S. EPA to assess toxicity data for unconventional oils (dilbits), and establish baseline toxicity data for selected crude oils and dispersant in support of planning and response activities. Abstract reporting the results of EPA's oil and dispersant toxicity testing program
ATLAS LTCS Vertically Challenged System Lessons Learned
NASA Technical Reports Server (NTRS)
Patel, Deepak; Garrison, Matt; Ku, Jentung
2014-01-01
Re-planning of LTCS TVAC testing and supporting RTA (Receiver Telescope Assembly) Test Plan and Procedure document preparation. The Laser Thermal Control System (LTCS) is designed to maintain the lasers onboard Advanced Topographic Laser Altimeter System (ATLAS) at their operational temperatures. In order to verify the functionality of the LTCS, a thermal balance test of the thermal hardware was performed. During the first cold start of the LTCS, the Loop Heat Pipe (LHP) was unable to control the laser mass simulators temperature. The control heaters were fully on and the loop temperature remained well below the desired setpoint. Thermal analysis of the loop did not show these results. This unpredicted behavior of the LTCS was brought up to a panel of LHP experts. Based on the testing and a review of all the data, there were multiple diagnostic performed in order to narrow down the cause. The prevailing theory is that gravity is causing oscillating flow within the loop, which artificially increased the control power needs. This resulted in a replan of the LTCS test flow and the addition of a GSE heater to allow vertical operation.
Proposed Schedule for Fenton Hill Experiments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Albright, James N.; Brown, Donald W.
To help in planning Fenton Hill experimental operations in concert with preparations for the Long-Term Flow Test (LTFT) next summer, the following schedule is proposed. This schedule fits some of the realities of the next few months, including the Laboratory closure during the Holidays, the seismic monitoring tests in Roswell, and the difficulties of operating during the winter months. Whenever possible, cyclic pumping operations during the colder months will be scheduled so that the pump will be on during the late evening and early morning hours to prevent freezeup.
NESHAP Annual Report for CY 2015 Sandia National Laboratories Tonopah Test Range
DOE Office of Scientific and Technical Information (OSTI.GOV)
Evelo, Stacie
2016-05-01
This National Emission Standards for Hazardous Air Pollutants (NESHAP) Annual Report has been prepared in a format to comply with the reporting requirements of 40 CFR 61.94 and the April 5, 1995 Memorandum of Agreement (MOA) between the Department of Energy (DOE) and the Environmental Protection Agency (EPA). According to the EPA approved NESHAP Monitoring Plan for the Tonopah Test Range (TTR), 40 CFR 61, subpart H, and the MOA, no additional monitoring or measurements are required at TTR in order to demonstrate compliance with the NESHAP regulation.
Books for the Career Counselor's Bookshelf.
ERIC Educational Resources Information Center
Career Planning and Adult Development Journal, 1990
1990-01-01
This special issue contains 29 signed book reviews on the following topics: job search, educational planning (financial aid and college guides), career counseling, interview preparation, career planning and development, outplacement, and retirement preparation. Publishers' addresses are provided. (SK)
Chemical Agents: Facts about Evacuation
... Resources for Emergency Health Professionals Training & Education Social Media What’s New Preparation & Planning More on Preparedness What CDC is ... Resources for Emergency Health Professionals Training & Education Social Media What’s New Preparation & Planning More on Preparedness What CDC is ...
Test development for the thermionic system evaluation test (TSET) project
NASA Astrophysics Data System (ADS)
Morris, D. Brent; Standley, Vaughn H.; Schuller, Michael J.
1992-01-01
The arrival of a Soviet TOPAZ-II space nuclear reactor affords the US space nuclear power (SNP) community the opportunity to study an assembled thermionic conversion power system. The TOPAZ-II will be studied via the Thermionic System Evaluation Test (TSET) Project. This paper is devoted to the discussion of TSET test development as related to the objectives contained in the TSET Project Plan (Standley et al. 1991). The objectives contained in the Project Plan are the foundation for scheduled TSET tests on TOPAZ-II and are derived from the needs of the Air Force Thermionic SNP program. Our ability to meet the objectives is bounded by unique constraints, such as procurement requirements, operational limitations, and necessary interaction between US and Soviet Scientists and engineers. The fulfillment of the test objectives involves a thorough methodology of test scheduling and data managment. The overall goals for the TSET program are gaining technical understanding of a thermionic SNP system and demonstrating the capabilities and limitations of such a system while assisting in the training of US scientist and engineers in preparation for US SNP system testing. Tests presently scheduled as part of TSET include setup, demonstration, and verification tests; normal and off-normal operating test, and system and component performance tests.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tan, J; Shi, F; Hrycushko, B
2015-06-15
Purpose: For tandem and ovoid (T&O) HDR brachytherapy in our clinic, it is required that the planning physicist manually capture ∼10 images during planning, perform a secondary dose calculation and generate a report, combine them into a single PDF document, and upload it to a record- and-verify system to prove to an independent plan checker that the case was planned correctly. Not only does this slow down the already time-consuming clinical workflow, the PDF document also limits the number of parameters that can be checked. To solve these problems, we have developed a web-based automatic quality assurance (QA) program. Methods:more » We set up a QA server accessible through a web- interface. A T&O plan and CT images are exported as DICOMRT files and uploaded to the server. The software checks 13 geometric features, e.g. if the dwell positions are reasonable, and 10 dosimetric features, e.g. secondary dose calculations via TG43 formalism and D2cc to critical structures. A PDF report is automatically generated with errors and potential issues highlighted. It also contains images showing important geometric and dosimetric aspects to prove the plan was created following standard guidelines. Results: The program has been clinically implemented in our clinic. In each of the 58 T&O plans we tested, a 14- page QA report was automatically generated. It took ∼45 sec to export the plan and CT images and ∼30 sec to perform the QA tests and generate the report. In contrast, our manual QA document preparation tooks on average ∼7 minutes under optimal conditions and up to 20 minutes when mistakes were made during the document assembly. Conclusion: We have tested the efficiency and effectiveness of an automated process for treatment plan QA of HDR T&O cases. This software was shown to improve the workflow compared to our conventional manual approach.« less
Hurricane Recovery Report 2004
NASA Technical Reports Server (NTRS)
Gordon, Joseph P.
2005-01-01
During August and September 2004, four hurricanes tested the mettle of Space Coast residents and the Kennedy Space Center (KSC) leadership and workforce. These threats underscored two important points: the very real vulnerability of KSC and its valuable space program assets to the devastating power of a hurricane, and the planning required to effectively deal with such threats. The damage was significant even though KSC did not experience sustained hurricane-force winds. To better understand and appreciate these points, this report provides an overview of the meteorological history of the Space Coast and what is involved in the planning, preparation, and recovery activities, as well as addressing the impacts of the 2004 hurricane season.
Engineering and simulation of life science Spacelab experiments
NASA Technical Reports Server (NTRS)
Bush, B.; Rummel, J.; Johnston, R. S.
1977-01-01
Approaches to the planning and realization of Spacelab life sciences experiments, which may involve as many as 16 Space Shuttle missions and 100 tests, are discussed. In particular, a Spacelab simulation program, designed to evaluate problems associated with the use of live animal specimens, the constraints imposed by zero gravity on equipment operation, training of investigators and data management, is described. The simulated facility approximates the hardware and support systems of a current European Space Agency Spacelab model. Preparations necessary for the experimental program, such as crew activity plans, payload documentation and inflight experimental procedures are developed; health problems of the crew, including human/animal microbial contamination, are also assessed.
Preparing for Science at Sea - a Chief Scientists Training Cruise on Board the RV Sikuliaq
NASA Astrophysics Data System (ADS)
Coakley, B.; Pockalny, R. A.
2017-12-01
As part of their education, marine geology and geophysics students spend time at sea, collecting, processing and interpreting data to earn their degrees. While this is a critical component of their preparation, it is an incomplete introduction to the process of doing science at sea. Most students are unfamiliar with the proposal process. Many students spend their time at sea performing assigned tasks without responsibility or participation in cruise planning and execution. In December 2016, we conducted a two-week-long, NSF-funded "Chief Scientist Training Cruise" aboard the R/V Sikuliaq designed to complete their introduction to seagoing science by giving the students the opportunity to plan and execute surveys based hypotheses they formulated. The educational process began with applicants responding to a request for proposals (RFP), which provided a framework for the scientific potential of the cruise. This process continued training through two days of workshops and presentations at the Hawai'i Institute of Geophysics. The students used existing data to define hypotheses, plan surveys, and collect/analyze data to test their hypothesis. The survey design was subject to the time constraints imposed by the ship schedule and the physical constraints imposed by the ship's equipment. The training and sea time made it possible to address all of steps of the scientific process, including proposal writing. Once underway, the combination of conducting the planned surveys and attending daily presentations helped familiarize the students with at-sea operations, the equipment on board the RV Sikuliaq, and the process of writing proposals to NSF for sea-going science. Questionnaires conducted prior to the cruise and in the final days before arriving in port document the success of this training program for developing the abilities and confidence in identifying significant scientific problems, preparing proposals to secure funding, and planning and directing ship surveys.
ERIC Educational Resources Information Center
Florida State Dept. of Education, Tallahassee. Div. of Vocational, Adult, and Community Education.
This document contains 19 lesson plans that can be used for career awareness activities in third grade. The lessons were developed by teachers and submitted as part of the Florida Blueprint for Career Preparation. The lesson plans include a topic, materials and information needed, and directions for activities. Lesson plans are designated by…
ERIC Educational Resources Information Center
Florida State Dept. of Education, Tallahassee. Div. of Vocational, Adult, and Community Education.
This document contains 17 lesson plans that can be used for career awareness activities in fifth grade. The lessons were developed by teachers and submitted as part of the Florida Blueprint for Career Preparation. The lesson plans include a topic, materials and information needed, and directions for activities. Lesson plans are designated by…
An impact evaluation of Plan Indonesia's early childhood program.
Aboud, Frances E; Proulx, Kerrie; Asrilla, Zaitu
2016-12-27
High-quality preschools are known to prepare children for success in primary school. Over half of Indonesia's children now pass through preschools whose quality and effectiveness are unknown. Our goal was to evaluate two government preschool models, namely kindergarten (TK) and the less formal health-post (PAUD), with and without capacity-building efforts of a non-governmental organization (NGO-Plan), on children's language and math skills. Thirteen TK and 17 PAUD Plan-supported and the same number of government-supported preschools were randomly selected from East Nusa Tenggara, Indonesia. Five children from each (n = 292) and five who had graduated from each and were now in first grade (n = 241) were randomly selected and tested on language and math measures. The Plan-supported preschools were assessed for quality. Mothers reported on their family's socio-demographic situation and their child's preventive health practices, illnesses and diet over the previous two weeks. Analyses of covariance adjusting for clusters indicated that children attending Plan-supported preschools performed better overall, and especially those in TK preschools. Plan-supported TKs were observed to have higher quality than Plan-supported PAUDs. First graders who graduated from Plan-supported preschools, both TK and PAUD, achieved higher scores on language and math tests than government-supported graduates. Preventive health practices were better in the Plan group, though diet and height-for-age were poor overall. Upgrades to the government preschool program are needed to raise its quality and effectiveness, specifically by introducing a mix of instructional and indoor free-choice play, resources and teacher training to support children's learning.
Disclosing medical mistakes: a communication management plan for physicians.
Petronio, Sandra; Torke, Alexia; Bosslet, Gabriel; Isenberg, Steven; Wocial, Lucia; Helft, Paul R
2013-01-01
There is a growing consensus that disclosure of medical mistakes is ethically and legally appropriate, but such disclosures are made difficult by medical traditions of concern about medical malpractice suits and by physicians' own emotional reactions. Because the physician may have compelling reasons both to keep the information private and to disclose it to the patient or family, these situations can be conceptualized as privacy dilemmas. These dilemmas may create barriers to effectively addressing the mistake and its consequences. Although a number of interventions exist to address privacy dilemmas that physicians face, current evidence suggests that physicians tend to be slow to adopt the practice of disclosing medical mistakes. This discussion proposes a theoretically based, streamlined, two-step plan that physicians can use as an initial guide for conversations with patients about medical mistakes. The mistake disclosure management plan uses the communication privacy management theory. The steps are 1) physician preparation, such as talking about the physician's emotions and seeking information about the mistake, and 2) use of mistake disclosure strategies that protect the physician-patient relationship. These include the optimal timing, context of disclosure delivery, content of mistake messages, sequencing, and apology. A case study highlighted the disclosure process. This Mistake Disclosure Management Plan may help physicians in the early stages after mistake discovery to prepare for the initial disclosure of a medical mistakes. The next step is testing implementation of the procedures suggested.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gilman, J
2005-03-15
To prepare for this project, EPRI and BWRVIP conducted a workshop at Ponte Vedra Beach, Florida during February 19-21, 2003 (EPRI report 1007822). Attendees were invited to exchange relevant information on the effects of irradiation on austenitic materials in light water reactors and to produce recommendations for further work. EPRI reviewed the data, recommendations, and conclusions derived from the workshop and developed prioritized test matrices defining new data needs. Proposals were solicited, and selected proposals are the basis for the program described in this report. Results The planned test matrix for fracture toughness testing includes 21 tests on 5 materials.
Ames Research Center life sciences payload
NASA Technical Reports Server (NTRS)
Callahan, P. X.; Tremor, J. W.
1982-01-01
In response to a recognized need for an in-flight animal housing facility to support Spacelab life sciences investigators, a rack and system compatible Research Animal Holding Facility (RAHF) has been developed. A series of ground tests is planned to insure its satisfactory performance under certain simulated conditions of flight exposure and use. However, even under the best conditions of simulation, confidence gained in ground testing will not approach that resulting from actual spaceflight operation. The Spacelab Mission 3 provides an opportunity to perform an inflight Verification Test (VT) of the RAHF. Lessons learned from the RAHF-VT and baseline performance data will be invaluable in preparation for subsequent dedicated life sciences missions.
Aircraft Mishap Exercise at SLF
2018-02-14
Members of NASA Kennedy Space Center's Flight Operations team prepare for a rehearsal of a helicopter crash-landing to test new and updated emergency procedures. Called the Aircraft Mishap Preparedness and Contingency Plan, the operation was designed to validate several updated techniques the center's first responders would follow, should they ever need to rescue a crew in case of a real accident. The mishap exercise took place at the center's Shuttle Landing Facility.
Aircraft Mishap Exercise at SLF
2018-02-14
A member of NASA Kennedy Space Center's Flight Operations team prepares for a rehearsal of a helicopter crash-landing to test new and updated emergency procedures. Called the Aircraft Mishap Preparedness and Contingency Plan, the operation was designed to validate several updated techniques the center's first responders would follow, should they ever need to rescue a crew in case of a real accident. The mishap exercise took place at the center's Shuttle Landing Facility.
Portable exhauster POR-007/Skid E and POR-008/Skid F storage plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, O.D.
1998-07-25
This document provides storage requirements for 1,000 CFM portable exhausters POR-O07/Skid E and POR-008/Skid F. These requirements are presented in three parts: preparation for storage, storage maintenance and testing, and retrieval from storage. The exhauster component identification numbers listed in this document contain the prefix POR-007 or POR-008 depending on which exhauster is being used.
A Class to Prepare Students to Manage Educational Debt.
ERIC Educational Resources Information Center
Popik, Roberta S.; And Others
1986-01-01
A counseling program prepared for Georgetown University School of Dentistry is described. It trains students in concepts associated with short- and long-term financial planning, banking relationships, credit, business planning and structuring debt into an individual student's lifestyle. (MLW)
NASA Technical Reports Server (NTRS)
Butler, Ricky W.; Munoz, Cesar A.; Siminiceanu, Radu I.
2007-01-01
This paper describes a translator from a new planning language named the Abstract Plan Preparation Language (APPL) to the Symbolic Analysis Laboratory (SAL) model checker. This translator has been developed in support of the Spacecraft Autonomy for Vehicles and Habitats (SAVH) project sponsored by the Exploration Technology Development Program, which is seeking to mature autonomy technology for the vehicles and operations centers of Project Constellation.
Liu, Fangchao; Zhang, Shikun; Liu, Jue; Wang, Qiaomei; Shen, Haiping; Zhang, Yiping; Liu, Min
2017-09-01
Infection with rubella virus during pregnancy can result in congenital defects and adverse pregnancy outcomes. The risk of rubella infection is greatly determined by the level of rubella antibodies in the serum. A survey of rubella antibody seronegativity rates was conducted in 780 000 women in rural China who were planning a pregnancy, in order to evaluate the herd susceptibility in different age groups and by high, middle, and low GDP per capita regions. In order to evaluate the herd susceptibility to rubella, a nationwide population-based study of rural Chinese women who were planning to have a baby and who were aged 21-49 years was instigated. As a part of the National Free Pre-conception Health Examination Project covering 29 provinces in 2012, a physical check-up program was provided to women who planned to become pregnant within the next 6 months. All medical data were from serological samples tested by ELISA, and the participants' immunity status was categorized based on levels of rubella antibodies. Economic data were also collected to explore the association between herd susceptibility and socioeconomic characteristics in the women of childbearing age. A total 264 306 of 782 293 recruited women preparing for pregnancy tested susceptible to rubella (33.79%). The seronegativity rate in women with a history of vaccination was significantly lower than that in women who had not received the vaccination or did not know their vaccination history (23.76%, 33.70%, and 35.68%, respectively). The seronegativity rates were 26.89%, 37.86%, and 32.61% in high, middle, and low GDP per capita areas, respectively. After stratified analysis and adjusting for other factors by multiple logistic regression, the lower seronegativity rates in women in high GDP per capita regions compared to women in middle and low GDP per capita regions remained in the different age groups and subgroups of immunization history. There is a clear difference in rubella-specific susceptibility among rural women preparing for pregnancy of different sociodemographic and economic backgrounds. The number of rubella-susceptible rural women preparing for pregnancy, especially in relatively low GDP per capita regions in China, was high. Offering rubella vaccination to women who are rubella-susceptible and who plan to become pregnant should become one of the priorities in the field of public health work in China. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.
NASA deep space network operations planning and preparation
NASA Technical Reports Server (NTRS)
Jensen, W. N.
1982-01-01
The responsibilities and structural organization of the Operations Planning Group of NASA Deep Space Network (DSN) Operations are outlined. The Operations Planning group establishes an early interface with a user's planning organization to educate the user on DSN capabilities and limitations for deep space tracking support. A team of one or two individuals works through all phases of the spacecraft launch and also provides planning and preparation for specific events such as planetary encounters. Coordinating interface is also provided for nonflight projects such as radio astronomy and VLBI experiments. The group is divided into a Long Range Support Planning element and a Near Term Operations Coordination element.
Code of Federal Regulations, 2010 CFR
2010-07-01
... month period in the three years prior to the SPCC Plan self-certification date, or since becoming... § 112.1(b), you must prepare and implement a Plan within six months after you begin operations. (c) If... individual aboveground oil storage container with a capacity greater than 5,000 U.S. gallons. (2) A Tier II...
ERIC Educational Resources Information Center
Jones, Jan; And Others
This packet contains lesson plans and an evaluation for a janitorial unit designed to teach reading and writing skills to grocery store janitors. The lesson plans were developed, using the Laubach literacy method, for a workplace literacy project at Carr Grocery Store in Anchorage, Alaska. The lesson plans, which are correlated with Laubach skills…
NASA Technical Reports Server (NTRS)
Gaines, G. B.; Thomas, R. E.; Noel, G. T.; Shilliday, T. S.; Wood, V. E.; Carmichael, D. C.
1979-01-01
Potential long-term degradation modes for the two types of modules in the Mead array were determined and judgments were made as to those environmental stresses and combinations of stresses which accelerate the degradation of the power output. Hierarchical trees representing the severity of effects of stresses (test conditions) on eleven individual degradation modes were constructed and were pruned of tests judged to be nonessential. Composites of those trees were developed so that there is now one pruned tree covering eight degradation modes, another covering two degradation modes, and a third covering one degradation mode. These three composite trees form the basis for selection of test conditions in the final test plan which is now being prepared.
Full-Scale Transport controlled Impact Demonstration
NASA Technical Reports Server (NTRS)
Hayduk, R. J. (Compiler)
1986-01-01
The controlled impact demonstration (CID) test of a transport aircraft took place on December 1, 1984, crashing at a prepared site on Rogers Dry Lakebed, Edwards Air Force Base, California. The demonstration was a setback for the antimisting kerosene (AMK) researchers. The impact conditions, considerably different from the planned scenario, exposed large quantities of degraded AMK and hydraulic fluid and caused unexpectedly hot ignition sources, bulk loss of fuel from the right wing, airflow patterns over the wings and fuselage that were untested on AMK, and fuel intrusion into the lower fuselage. The test was much more severe than planned and is generally considered to be unrepresentative of the type of survivable crash that would benefit from AMK. Ninety-seven percent of the sensors on the fuselage and wing structure, seats, dummies, restraint systems, galley, and bins were active at impact. A wealth of sensor data was collected from this once-in-a-lifetime research test. The flight data recorder experiments on board were also generally successful.
NASA Astrophysics Data System (ADS)
Lucas, G.; Lénárt, C.; Solymosi, J.
2015-08-01
This paper introduces research done on the automatic preparation of remediation plans and navigation data for the precise guidance of heavy machinery in clean-up work after an industrial disaster. The input test data consists of a pollution extent shapefile derived from the processing of hyperspectral aerial survey data from the Kolontár red mud disaster. Three algorithms were developed and the respective scripts were written in Python. The first model aims at drawing a parcel clean-up plan. The model tests four different parcel orientations (0, 90, 45 and 135 degree) and keeps the plan where clean-up parcels are less numerous considering it is an optimal spatial configuration. The second model drifts the clean-up parcel of a work plan both vertically and horizontally following a grid pattern with sampling distance of a fifth of a parcel width and keep the most optimal drifted version; here also with the belief to reduce the final number of parcel features. The last model aims at drawing a navigation line in the middle of each clean-up parcel. The models work efficiently and achieve automatic optimized plan generation (parcels and navigation lines). Applying the first model we demonstrated that depending on the size and geometry of the features of the contaminated area layer, the number of clean-up parcels generated by the model varies in a range of 4% to 38% from plan to plan. Such a significant variation with the resulting feature numbers shows that the optimal orientation identification can result in saving work, time and money in remediation. The various tests demonstrated that the model gains efficiency when 1/ the individual features of contaminated area present a significant orientation with their geometry (features are long), 2/ the size of pollution extent features becomes closer to the size of the parcels (scale effect). The second model shows only 1% difference with the variation of feature number; so this last is less interesting for planning optimization applications. Last model rather simply fulfils the task it was designed for by drawing navigation lines.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edwards, T.; Hera, K.; Coleman, C.
2011-12-05
Evaluation of Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) recently completed the evaluation of one of these opportunities - the possibility of using an Isolok sampling valve as an alternative to the Hydragard valve for taking DWPF process samples at the Slurry Mix Evaporator (SME). The use of an Isolok for SME sampling has the potential to improve operability, reduce maintenance time, and decrease CPC cycle time. The SME acceptability testingmore » for the Isolok was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 and was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNLRP-2011-00145. RW-0333P QA requirements applied to the task, and the results from the investigation were documented in SRNL-STI-2011-00693. Measurement of the chemical composition of study samples was a critical component of the SME acceptability testing of the Isolok. A sampling and analytical plan supported the investigation with the analytical plan directing that the study samples be prepared by a cesium carbonate (Cs{sub 2}CO{sub 3}) fusion dissolution method and analyzed by Inductively Coupled Plasma - Optical Emission Spectroscopy (ICP-OES). The use of the cesium carbonate preparation method for the Isolok testing provided an opportunity for an additional assessment of this dissolution method, which is being investigated as a potential replacement for the two methods (i.e., sodium peroxide fusion and mixed acid dissolution) that have been used at the DWPF for the analysis of SME samples. Earlier testing of the Cs{sub 2}CO{sub 3} method yielded promising results which led to a TTR from Savannah River Remediation, LLC (SRR) to SRNL for additional support and an associated TTQAP to direct the SRNL efforts. A technical report resulting from this work was issued that recommended that the mixed acid method be replaced by the Cs{sub 2}CO{sub 3} method for the measurement of magnesium (Mg), sodium (Na), and zirconium (Zr) with additional testing of the method by DWPF Laboratory being needed before further implementation of the Cs{sub 2}CO{sub 3} method at that laboratory. While the SME acceptability testing of the Isolok does not address any of the open issues remaining after the publication of the recommendation for the replacement of the mixed acid method by the Cs{sub 2}CO{sub 3} method (since those issues are to be addressed by the DWPF Laboratory), the Cs{sub 2}CO{sub 3} testing associated with the Isolok testing does provide additional insight into the performance of the method as conducted by SRNL. The performance is to be investigated by looking to the composition measurement data generated by the samples of a standard glass, the Analytical Reference Glass - 1 (ARG-1), that were prepared by the Cs{sub 2}CO{sub 3} method and included in the SME acceptability testing of the Isolok. The measurements of these samples were presented as part of the study results, but no statistical analysis of these measurements was conducted as part of those results. It is the purpose of this report to provide that analysis, which was supported using JMP Version 7.0.2.« less
Wang, Wen-ming; Yan, Zhen; Liu, Han-jiang; Zhang, Lei-hong; Xia, Li; Zhao, Zhen-dong
2013-12-01
To provide reference for the government to formulate policies and medical institution to formulate development plan, the present situation of medical institutions of traditional Chinese preparation and some countermeasures for developing the research of traditional Chinese preparation in Guangdong province were studied. Combined with development situation of traditional Chinese preparation of medical institutions in Guangdong province in recent years, the development countermeasure of traditional Chinese preparation was discussed. In order to promote the development of traditional Chinese preparation of medical institutions, suggestions and countermeasures for the government and related departments were proposed. Government departments should formulate policies to support the development of traditional Chinese preparation, the medical institutions should make scientific development planning, strengthen the construction of hardware and software and develop special traditional Chinese preparation to promote the healthy development of traditional Chinese preparation.
Zehnder, M S; Connert, T; Weiger, R; Krastl, G; Kühl, S
2016-10-01
To present a novel method utilizing 3D printed templates to gain guided access to root canals and to evaluate its accuracy in vitro. Sixty extracted human teeth were placed into six maxillary jaw models. Preoperative CBCT scans were matched with intra-oral scans using the coDiagnostix(™) software. Access cavities, sleeves and templates for guidance were virtually planned. Templates were produced by a 3D printer. After access cavity preparation by two operators, a postoperative CBCT scan was superimposed on the virtual planning. Accuracy was measured by calculating the deviation of planned and prepared cavities in three dimensions and angle. Ninety-five per cent confidence intervals were calculated for both operators. All root canals were accessible after cavity preparation with 'Guided Endodontics'. Deviations of planned and prepared access cavities were low with means ranging from 0.16 to 0.21 mm for different aspects at the base of the bur and 0.17-0.47 mm at the tip of the bur. Mean of angle deviation was 1.81°. Overlapping 95% confidence intervals revealed no significant difference between operators. 'Guided Endodontics' allowed an accurate access cavity preparation up to the apical third of the root utilizing printed templates for guidance. All root canals were accessible after preparation. © 2015 International Endodontic Journal. Published by John Wiley & Sons Ltd.
The Mars Climate Orbiter is prepared for a spin test in the SAEF- 2
NASA Technical Reports Server (NTRS)
1998-01-01
In the Spacecraft Assembly and Encapsulation Facility -2 (SAEF- 2), workers prepare the Mars Climate Orbiter for a spin test. Targeted for launch aboard a Delta II rocket on Dec. 10, 1998, the orbiter is heading for Mars where it will primarily support its companion Mars Polar Lander spacecraft, which is planned for launch on Jan. 3, 1999. At the extreme right can be seen the lander in another work area. The orbiter's instruments will monitor the Martian atmosphere and image the planet's surface on a daily basis for 687 Earth days. It will observe the appearance and movement of atmospheric dust and water vapor, as well as characterize seasonal changes on the surface. The detailed images of the surface features will provide important clues to the planet's early climate history and give scientists more information about possible liquid water reserves beneath the surface.
Preparing NASA InSight Spacecraft for Vibration Test
2015-08-18
Spacecraft specialists at Lockheed Martin Space Systems, Denver, prepare NASA's InSight spacecraft for vibration testing as part of assuring that it is ready for the rigors of launch from Earth and flight to Mars. The spacecraft is oriented with its heat shield facing up in this July 13, 2015, photograph. InSight, for Interior Exploration Using Seismic Investigations, Geodesy and Heat Transport, is scheduled for launch in March 2016 and landing in September 2016. It will study the deep interior of Mars to advance understanding of the early history of all rocky planets, including Earth. Note: After thorough examination, NASA managers have decided to suspend the planned March 2016 launch of the Interior Exploration using Seismic Investigations Geodesy and Heat Transport (InSight) mission. The decision follows unsuccessful attempts to repair a leak in a section of the prime instrument in the science payload. http://photojournal.jpl.nasa.gov/catalog/PIA19815
Ampe, Sophie; Sevenants, Aline; Coppens, Evelien; Spruytte, Nele; Smets, Tinne; Declercq, Anja; van Audenhove, Chantal
2015-05-01
To evaluate the effects of 'we DECide', an educational intervention for nursing home staff on shared decision-making in the context of advance care planning for residents with dementia. Advance care planning (preparing care choices for when persons no longer have decision-making capacity) is of utmost importance for nursing home residents with dementia, but is mostly not realized for this group. Advance care planning consists of discussing care choices and making decisions and corresponds to shared decision-making (the involvement of persons and their families in care and treatment decisions). This quasi-experimental pre-test-post-test study is conducted in 19 nursing homes (Belgium). Participants are nursing home staff. 'We DECide' focuses on three crucial moments for discussing advance care planning: the time of admission, crisis situations and everyday conversations. The 'ACP-audit' assesses participants' views on the organization of advance care planning (organizational level), the 'OPTION scale' evaluates the degree of shared decision-making in individual conversations (clinical level) and the 'IFC-SDM Questionnaire' assesses participants' views on Importance, Frequency and Competence of realizing shared decision-making (clinical level). (Project funded: July 2010). The study hypothesis is that 'we DECide' results in a higher realization of shared decision-making in individual conversations on advance care planning. A better implementation of advance care planning will lead to a higher quality of end-of-life care and more person-centred care. We believe our study will be of interest to researchers and to professional nursing home caregivers and policy-makers. © 2014 John Wiley & Sons Ltd.
[Management of the risks associated with allergens in school canteens in Barcelona (Spain)].
Caballé-Gavaldà, Laura; García-Cid, Ester; Fontcuberta-Famadas, Mireia; Balfagón-Marzal, Pere; Durán-Neira, Julia
2014-01-01
To determine demand for special meals and their types for students with food allergies or intolerances (FAI) in school canteens in Barcelona (Spain) during the 2011-12 school year, and to ascertain the degree of implementation of self-assessment plans and preventive measures for the management of allergens, and the relationships between the application of such measures and other variables. A descriptive study was performed of a representative sample of schools (n=129). The dependent variables collected data on the schools and students, the level of demand for special meals, and the implementation of preventive measures. Independent variables consisted of canteen management, the number of users, and whether self-assessment plans were implemented. For those schools that prepared meals (n=92), an index was calculated from the questions on preventive measures. Student t-tests were used to compare the means of the indices with stratification by the independent variables. A total of 89% of schools served special meals for students with FAI (1,507 special meals per day, 5% of all meals) and 65% had no allergen control plan. The mean of the indices was 11.6 out of 17. Externally managed canteens, with more users and with self-assessment plans, implemented more preventive measures for allergen management (p<0.05). A high proportion of schools report carrying out preventive measures in the process of preparing and serving special meals. Those with self-assessment plans have better preventive practices. To manage this food-related risk, food hygiene inspection services should promote the implementation of allergen control plans in school canteens. Copyright © 2014 SESPAS. Published by Elsevier Espana. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dave Madsen
This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less
Preparing the optics technology to observe the hot universe
NASA Astrophysics Data System (ADS)
Bavdaz, Marcos; Wille, Eric; Wallace, Kotska; Shortt, Brian; Fransen, Sebastiaan; Collon, Maximilien; Ackermann, Marcelo; Vacanti, Giuseppe; Guenther, Ramses; Haneveld, Jeroen; Riekerink, Mark Olde; van Baren, Coen; Kampf, Dirk; Zuknik, Karl-Heinz; Christensen, Finn; Della Monica Ferreira, Desiree; Jakobsen, Anders Clemen; Krumrey, Michael; Müller, Peter; Burwitz, Vadim; Pareschi, Giovanni; Ghigo, Mauro
2014-07-01
With the selection of "The hot and energetic Universe" as science theme for ESA's second large class mission (L2) in the Cosmic Vision programme, work is focusing on the technology preparation for an advanced X-ray observatory. The core enabling technology for the high performance mirror is the Silicon Pore Optics (SPO) [1 to 23], a modular X-ray optics technology, which utilises processes and equipment developed for the semiconductor industry. The paper provides an overview of the programmatic background, the status of SPO technology and gives an outline of the development roadmap and activities undertaken and planned by ESA on optics, coatings [24 to 30] and test facilities [31, 33].
Preparing tomorrow's health sciences librarians: feasibility and marketing studies.
Moran, B B; Jenkins, C G; Friedman, C P; Lipscomb, C E; Gollop, C J; Moore, M E; Morrison, M L; Tibbo, H R; Wildemuth, B M
1996-01-01
The University of North Carolina at Chapel Hill is devising and evaluating five curricular models designed to improve education for health sciences librarianship. These models fit into a continual learning process from the initial professional preparation to lifelong learning opportunities. Three of them enhance existing degree and certificate programs in the School of Information and Library Science (SILS) with a health sciences specialization, and two are new programs for working information professionals. The approaches involve partnerships among SILS, the Health Sciences Library, and the program in Medical Informatics. The planning process will study the feasibility of the proposed programs, test the marketability of the models to potential students and employers, and make recommendations about implementation. PMID:8913557
Lone-actor Terrorism and Impulsivity.
Meloy, J Reid; Pollard, Jeffrey W
2017-11-01
In some recent cases of lone-actor terrorism, there is evidence the subject acted impulsively, often in response to a triggering event which contained a loss and humiliation. Evidence suggests the subjects acted precipitously, despite planning and preparation carried out in the preceding weeks or months, and their attacks failed to include the often considerable preparation that had been done. The pathway became a runway. The authors recommend the traditional assessment of impulsivity in persons of concern for lone acts of terrorism, as well as other proximal warning behaviors for targeted violence. Both indirect and direct assessment guidelines are proposed, with an emphasis upon self-report, psychological testing, collateral data gathering, and historical records. © 2017 American Academy of Forensic Sciences.
NASA Technical Reports Server (NTRS)
Remer, Donald S.; Sherif, Josef; Buchanan, Harry R.
1993-01-01
This paper develops a cost model to do long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The paper focuses on the costs required to modify and/or enhance the DSN to prepare for future space missions. The model is a function of eight major mission cost drivers and estimates both the total cost and the annual costs of a similar future space mission. The model is derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. Estimates derived from the model are tested against actual cost data for two independent missions, Viking and Mariner Jupiter/Saturn (MJS).
7 CFR 1724.53 - Preparation of plans and specifications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.53 Preparation of plans and specifications. The provisions of this section apply to all borrower electric system facilities regardless of the source of financing. (a...
7 CFR 1724.53 - Preparation of plans and specifications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.53 Preparation of plans and specifications. The provisions of this section apply to all borrower electric system facilities regardless of the source of financing. (a...
7 CFR 1724.53 - Preparation of plans and specifications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.53 Preparation of plans and specifications. The provisions of this section apply to all borrower electric system facilities regardless of the source of financing. (a...
7 CFR 1724.53 - Preparation of plans and specifications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.53 Preparation of plans and specifications. The provisions of this section apply to all borrower electric system facilities regardless of the source of financing. (a...
NASA Astrophysics Data System (ADS)
Gruzin, A. V.; Gruzin, V. V.; Shalay, V. V.
2017-08-01
The development of technology for a directional soil compaction of tank foundations for oil and oil products storage is a relevant problem which solution will enable simultaneously provide required operational characteristics of a soil foundation and reduce time and material costs to prepare the foundation. The impact dynamics of rammers' operating elements on the soil foundation is planned to specify in the course of laboratory studies. A specialized technique is developed to justify the parameters and select the equipment for laboratory researches. The usage of this technique enabled us to calculate dimensions of the models, of a test bench and specifications of the recording equipment, and a lighting system. The necessary equipment for laboratory studies was selected. Preliminary laboratory tests were carried out. The estimate of accuracy for planned laboratory studies was given.
Observing strategies for future solar facilities: the ATST test case
NASA Astrophysics Data System (ADS)
Uitenbroek, H.; Tritschler, A.
2012-12-01
Traditionally solar observations have been scheduled and performed very differently from night time efforts, in particular because we have been observing the Sun for a long time, requiring new combinations of observables to make progress, and because solar physics observations are often event driven on time scales of hours to days. With the proposal pressure that is expected for new large-aperture facilities, we can no longer afford the time spent on custom setups, and will have to rethink our scheduling and operations. We will discuss our efforts at Sac Peak in preparing for this new era, and outline the planned scheduling and operations planning for the ATST in particular.
38 CFR 21.92 - Preparation of the plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) VOCATIONAL REHABILITATION AND EDUCATION Vocational Rehabilitation and Employment Under 38 U.S.C. Chapter 31... specialist or counseling psychologist designated as case manager has the primary role in carrying out... counseling psychologist has the primary responsibility for the preparation of plans. (Authority: 38 U.S.C...
38 CFR 21.92 - Preparation of the plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) VOCATIONAL REHABILITATION AND EDUCATION Vocational Rehabilitation and Employment Under 38 U.S.C. Chapter 31... specialist or counseling psychologist designated as case manager has the primary role in carrying out... counseling psychologist has the primary responsibility for the preparation of plans. (Authority: 38 U.S.C...
38 CFR 21.92 - Preparation of the plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) VOCATIONAL REHABILITATION AND EDUCATION Vocational Rehabilitation and Employment Under 38 U.S.C. Chapter 31... specialist or counseling psychologist designated as case manager has the primary role in carrying out... counseling psychologist has the primary responsibility for the preparation of plans. (Authority: 38 U.S.C...
38 CFR 21.92 - Preparation of the plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) VOCATIONAL REHABILITATION AND EDUCATION Vocational Rehabilitation and Employment Under 38 U.S.C. Chapter 31... specialist or counseling psychologist designated as case manager has the primary role in carrying out... counseling psychologist has the primary responsibility for the preparation of plans. (Authority: 38 U.S.C...
Guidelines for Transitional Education Plan Preparation
ERIC Educational Resources Information Center
Lattanzio, Raphaëlle Martinez; Bethke, Lynne; Haas, Anna; Perrier, Janne Kjaersgaard; De Grauwe, Anton; Sigsgaard, Morten; Bird, Lyndsay; Coury, Diane; Gay, Dorian; MacEwan, Leonora; Seeger, Anna
2016-01-01
The "Guidelines for the Transitional Education Plan Preparation" are the result of an extensive consultation process and the product of fruitful guidance and contributions from key partners active in the field of education in emergencies and protracted crises. The new global education agenda 2030 places strong emphasis on countries…
MARINER 10 LAUNCH VEHICLE ATLAS CENTAUR 34 UNDERGOES TANKING TEST AT LAUNCH COMPLEX 36B
NASA Technical Reports Server (NTRS)
1973-01-01
Atlas Centaur 34, undergoes tanking test on NASA Complex 36B at Cape Kennedy, Fla. Atlas Centaur 34 is under preparation to launch history's first duel-planet flight, the Mariner mission to Venus and Mercury, scheduled for early November. With all events going as planned, the Mariner spacecraft will fly by Venus in early February, 1974, and reach Mercury in late march, 1974. The spacecraft, Mariner 10, will carry two television cameras to photograph the planets, and six other scientific experiments to return planetary and interplanetary data back to Earth.
Acquisition/expulsion system for earth orbital propulsion system study. Volume 2: Cryogenic design
NASA Technical Reports Server (NTRS)
1973-01-01
Detailed designs were made for three earth orbital propulsion systems; (1) the space shuttle (integrated) OMS/RCS, (2) the space shuttle (dedicated) OMS (LO2), and (3) the space tug. The preferred designs from the integrated OMS/RCS were used as the basis for the flight test article design. A plan was prepared that outlines the steps, cost, and schedule required to complete the development of the prototype DSL tank and feedline (LH2 and LO2) systems. Ground testing of a subscale model using LH2 verified the expulsion characteristics of the preferred DSL designs.
2002-12-18
KENNEDY SPACE CENTER, FLA. -- STS-107 Payload Specialist Ilan Ramon, the first Israeli astronaut, participates in Terminal Countdown Demonstration Test activities, a standard part of Shuttle launch preparations. STS-107 is a mission devoted to research and will include more than 80 experiments that will study Earth and space science, advanced technology development, and astronaut health and safety. Launch is planned for Jan. 16, 2003, between 10 a.m. and 2 p.m. EST aboard Space Shuttle Columbia.
The Leader-Clinician Advocate in Advancing Student Clinical Learning.
Bleich, Michael R
2017-03-01
The visionary, think-ahead leader realizes a responsibility to ensure that a steady pipeline of qualified professionals exists. In the settings where they lead, academic partnerships can ensure that students are socialized and adequately prepared for existing and emerging job roles. Concept-based learning, NCLEX-RN test plans, and 12 strategies to ensure leader-clinician engagement with students are presented. J Contin Educ Nurs. 2017;48(3):99-101. Copyright 2017, SLACK Incorporated.
NASA Astrophysics Data System (ADS)
Wang, Zhe; Pan, Zhijuan
2015-11-01
Hierarchical structured nano-sized/porous poly(lactic acid) (PLA-N/PLA-P) composite fibrous membranes with excellent air filtration performance were prepared via an electrospinning technique. Firstly, PLA-P fibers with different morphology were fabricated by varying the relative humidity, and the nanopores on fiber surface played a key role in improving the specific surface area and filtration performance of the resultant membranes. Secondly, hierarchical structure of PLA-N/PLA-P interlaced structured membranes and PLA-N/PLA-P double-layer structured membranes with different mass ratios for further enhanced air filtration performance were also successfully prepared by combining PLA-N fibers with PLA-P fibers. Filtration tests by measuring the penetration of sodium chloride (NaCl) aerosol particles with a 260 nm mass median diameter revealed that a moderate mass ratio of PLA-P fibers and PLA-N fibers contributed to improving the filtration performance of the hierarchical structured PLA-N/PLA-P composite membrane, and the double-layer structured PLA-N/PLA-P membrane possessed a higher filtration efficiency and quality factor than that of an interlaced structured PLA-N/PLA-P membrane with the same mass ratio. The as-prepared PLA-N/PLA-P double-layer structured membrane with a mass ratio of 1/5 showed a high filtration efficiency (99.999%) and a relatively low pressure drop (93.3 Pa) at the face velocity of 5.3 cm/s.
Kamalikhah, Tahereh; Rakhshani, Fatemeh; Rahmati Najarkolaei, Fatemeh; Gholian Avval, Mehdi
2015-01-01
Background: It cannot be denied that many improvements in female and child health have been achieved worldwide through international family planning programs. More than half of the females (57%) with unintended pregnancy admitted that they had not used birth control the month before conception. Objectives: The aim of this study was to promote family planning practice among females of Zahedan (southeast of Iran) through the transtheoretical model (TTM). Patients and Methods: The current quasi-experimental study was conducted on 96 eligible females, who were allocated either to the case or the control group and were selected from homes in the border of Zahedan city (southeast of Iran) during 2010. Convenience sampling by door-to-door visits was used for finding eligible cases. A TTM-based self-administrated family planning questionnaire was used for data collection. Participants in the intervention group received education in two groups, based on their stage of change: precontemplation, contemplation, preparation, action, maintenance, and all groups were followed for three months. Results: The result of the chi-square test did not show any significant difference in the stage of change: precontemplation, contemplation, preparation, action, maintenance before education between the control and intervention groups (P = 0.55). After education, subjects in the intervention group moved forward through stage of change and got at least one step closer to the family planning behavior., with this change being significant (P < 0.001), while the movement of participants through stage of change not being significant in control group (P = 1). The results of statistical tests illustrated that the mean knowledge of the intervention group was 7.5 ± 7.1 versus 0.5 ± 4 for the control group (P < 0.001), mean of attitude of the intervention group was 5.5 ± 5.41 versus 0.09 ± 2.04 for the control group (P < 0.001), and practicing family planning methods (P < 0.007) in the intervention group was higher than the control group after education based on TTM. Conclusions: According to this study, the educational plan based on TTM was effective in changing knowledge, attitude, and practice and directing females towards taking action. Moreover, self-efficacy, perceived barriers and benefits are factors that affect the use of family planning methods. PMID:26568846
Dawdy, Krista; Bonin, Katija; Russell, Steve; Ryzynski, Agnes; Harth, Tamara; Townsend, Christopher; Liu, Stanley; Chu, William; Cheung, Patrick; Chung, Hans; Morton, Gerard; Vesprini, Danny; Loblaw, Andrew; Cao, Xingshan; Szumacher, Ewa
2018-06-01
The purpose of this study is to determine the effectiveness of multimedia educational tools to improve CT planning preparation for intensity modulated radiotherapy (IMRT) for prostate cancer. Many patients are not prepared when given verbal preparation instructions to have a full bladder and empty rectum for their IMRT and require being rescanned, which results in additional costs for the patient and the hospital. A pamphlet and video outlining the proper preparation for prostate IMRT was created to decrease additional scans and the associated costs, while increasing patient satisfaction. A controlled, randomized experimental group study was conducted to examine the effectiveness of the multimedia tools (the video and the pamphlet), as compared to the pamphlet only, in preparing patients for their planning CT appointment. We found no statistical difference between the multimedia group and the pamphlet group in patients' preparedness for their appointments and the rescanning rate. However, patients in the multimedia group indicated that they felt more prepared about their treatment after watching the video and stated that they would recommend the video to other patients with prostate cancer. Furthermore, patients who had to wait longer for their planning CT appointment felt less prepared by the materials than those with a shorter wait time. We recommend reducing wait times between appointments as much as possible to increase patients' preparedness for the planning CT. We conclude that providing multimedia treatment information and minimizing wait times increases patients' feelings of preparedness leading to a more positive treatment experience and reducing costly rescans. ClinicalTrials.gov NCT02410291.
Durability of ITO-MgF2 Films for Space-Inflatable Polymer Structures
NASA Technical Reports Server (NTRS)
Kerslake, Thomas W.; Waters, Deborah L.; Schieman, David A.; Hambourger, Paul D.
2003-01-01
This paper presents results from ITO-MgF2 film durability evaluations that included tape peel, fold, thermal cycle, and AO exposure testing. Polymer coupon preparation is described as well as ITO-MgF2 film deposition equipment, procedures and film characterization. Durability testing methods are also described. The pre- and post-test condition of the films is assessed visually, microscopically, and electrically. Results show that at 500 ITO - 9 vol% MgF2 film is suitable to protect polymer surfaces, such as those used in space-inflatable structures of the PowerSphere microsatellite concept, during a 1-year Earth orbiting mission. Future plans for ground-based and orbital testing of this film are also discussed.
NASA Technical Reports Server (NTRS)
Lewis, Pattie
2007-01-01
Stennis Space Center (SSC), Kennedy Space Center (KSC) and Air Force Space Command (AFSPC) identified particulate emissions and waste generated from the depainting process of steel structures as hazardous materials to be eliminated or reduced. A Potential Alternatives Report, Potential Alternatives Report for Validation of Alternative Low Emission Surface Preparation/Depainting Technologies for Structural Steel, provided a technical analyses of identified alternatives to the current coating removal processes, criteria used to select alternatives for further analysis, and a list of those alternatives recommended for testing. The initial coating removal alternatives list was compiled using literature searches and stakeholder recommendations. The involved project participants initially considered approximately 13 alternatives. In late 2003, core project members selected the following depainting processes to be further evaluated: (1) Plastic Blast Media-Quickstrip(R)-A. (2) Hard Abrasive-Steel-Magic(R). (3) Sponge Blasting-Sponge-Jet(R). (4) Liquid Nitrogen-NItroJet(R). (5) Mechanical Removal with Vacuum Attachment-DESCO and OCM Clean-Air (6) Laser Coating Removal Alternatives were tested in accordance with the Joint Test Protocol for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel, and the Field Evaluation Test Plan for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel. Results of the testing are documented in the Joint Test Report. This Cost-Benefit Analysis (CBA) focuses on the three alternatives (Quickstrip(R)-A, SteelMagic (R), and Sponge-Jet(R)) that were considered viable alternatives for large area operations based on the results of the field demonstration and lab testing. This CBA was created to help participants determine if implementation of the candidate alternatives is economically justified. Each of the alternatives examined reduced Environmental Activity (EA) Costs-those costs associated with complying with environmental regulations. One alternative, Steel-Magic(R), also showed reduced Direct Costs and reduced total costs.
The Hyper-X Flight Systems Validation Program
NASA Technical Reports Server (NTRS)
Redifer, Matthew; Lin, Yohan; Bessent, Courtney Amos; Barklow, Carole
2007-01-01
For the Hyper-X/X-43A program, the development of a comprehensive validation test plan played an integral part in the success of the mission. The goal was to demonstrate hypersonic propulsion technologies by flight testing an airframe-integrated scramjet engine. Preparation for flight involved both verification and validation testing. By definition, verification is the process of assuring that the product meets design requirements; whereas validation is the process of assuring that the design meets mission requirements for the intended environment. This report presents an overview of the program with emphasis on the validation efforts. It includes topics such as hardware-in-the-loop, failure modes and effects, aircraft-in-the-loop, plugs-out, power characterization, antenna pattern, integration, combined systems, captive carry, and flight testing. Where applicable, test results are also discussed. The report provides a brief description of the flight systems onboard the X-43A research vehicle and an introduction to the ground support equipment required to execute the validation plan. The intent is to provide validation concepts that are applicable to current, follow-on, and next generation vehicles that share the hybrid spacecraft and aircraft characteristics of the Hyper-X vehicle.
Preparation of regional shorebird monitoring plans
Jonathan Bart; Ann Manning; Susan Thomas; Catherine Wightman
2005-01-01
Shorebird monitoring programs in Canada and the United States are being developed under the auspices of PRISM, the Program for Regional and International Shorebird Monitoring. PRISM provides a single blueprint for implementing the monitoring proposals in the shorebird conservation plans prepared recently in Canada and the United States. It includes four segments:...
Programs for skyline planning.
Ward W. Carson
1975-01-01
This paper describes four computer programs for the logging engineer's use in planning log harvesting by skyline systems. One program prepares terrain profile plots from maps mounted on a digitizer; the other programs prepare load-carrying capability and other information for single and multispan standing skylines and single span running skylines. In general, the...
9 CFR 108.3 - Preparation of plot plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Preparation of plot plans. 108.3 Section 108.3 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF... all buildings so that they may be correlated with the respective blueprints and legends. (e) Describe...
NASA Technical Reports Server (NTRS)
Palguta, T.; Bradley, W.; Stockton, T.
1988-01-01
Guidance in preparing and updating an integrated logistics support plan (ILSP) is given. Clear, concise, and detailed instructions are provided on the preparation and content of an ILSP in order to ensure a quality document that reflects total program requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Requirement to prepare and implement a Spill Prevention, Control, and Countermeasure Plan. 112.3 Section 112.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Applicability, Definitions...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Requirement to prepare and implement a Spill Prevention, Control, and Countermeasure Plan. 112.3 Section 112.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Applicability, Definitions...
40 CFR 51.116 - Data availability.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 2 2013-07-01 2013-07-01 false Data availability. 51.116 Section 51... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.116 Data availability. (a) The State must retain all detailed data and calculations used in the preparation of each plan...
40 CFR 51.116 - Data availability.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Data availability. 51.116 Section 51... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.116 Data availability. (a) The State must retain all detailed data and calculations used in the preparation of each plan...
40 CFR 51.116 - Data availability.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 2 2012-07-01 2012-07-01 false Data availability. 51.116 Section 51... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.116 Data availability. (a) The State must retain all detailed data and calculations used in the preparation of each plan...
ERIC Educational Resources Information Center
Nevada System of Higher Education, 2011
2011-01-01
This report is prepared in accordance to state law requiring the Nevada System of Higher Education (NSHE) to prepare a biennial report for submission to the Nevada State Legislature that outlines a plan for new programs and expansions of existing programs of instruction, public service and research. This report highlights the strategic objectives…
Engaging Students in Career Planning and Preparation through Ementoring
ERIC Educational Resources Information Center
Kinkel, Doreen H.
2011-01-01
Following a developmental model of career planning and preparation, an ementoring program was devised for first semester freshmen to (1) heighten career awareness and stimulate career exploration in food and agricultural sciences; (2) expand interest and willingness to follow career opportunities beyond the regional geographic area; and (3)…
Characterization of LWRS Hybrid SiC-CMC-Zircaloy-4 Fuel Cladding after Gamma Irradiation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Isabella J van Rooyen
2012-09-01
The purpose of the gamma irradiation tests conducted at the Idaho National Laboratory (INL) was to obtain a better understanding of chemical interactions and potential changes in microstructural properties of a mock-up hybrid nuclear fuel cladding rodlet design (unfueled) in a simulated PWR water environment under irradiation conditions. The hybrid fuel rodlet design is being investigated under the Light Water Reactor Sustainability (LWRS) program for further development and testing of one of the possible advanced LWR nuclear fuel cladding designs. The gamma irradiation tests were performed in preparation for neutron irradiation tests planned for a silicon carbide (SiC) ceramic matrixmore » composite (CMC) zircaloy-4 (Zr-4) hybrid fuel rodlet that may be tested in the INL Advanced Test Reactor (ATR) if the design is selected for further development and testing« less
Tank 241-AY-101 Privatization Push Mode Core Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEMPLETON, A.M.
2000-01-12
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AY-101. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AY-101 required to satisfy Data Quality Objectives For RPP Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO) (Nguyen 1999a), Data Quality Objectives For TWRS Privatization Phase I : Confirm Tank T Is An Appropriate Feed Source For Low-Activity Waste Feed Batch X (LAW DQO) (Nguyen 1999b), Low Activitymore » Waste and High-Level Waste Feed Data Quality Objectives (L and H DQO) (Patello et al. 1999), and Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO) (Bloom 1996). Special instructions regarding support to the LAW and HLW DQOs are provided by Baldwin (1999). Push mode core samples will be obtained from risers 15G and 150 to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples; composite the liquids and solids; perform chemical analyses on composite and segment samples; archive half-segment samples; and provide subsamples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AY-101 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plans and are not within the scope of this SAP.« less
Tank 241-AY-101 Privatization Push Mode Core Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEMPLETON, A.M.
2000-05-19
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AY-101. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AY-101 required to satisfy ''Data Quality Objectives For RPP Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO)' (Nguyen 1999a), ''Data Quality Objectives For TWRS Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For Low-Activity Waste Feed Butch X (LAW DQO) (Nguyen 1999b)'', ''Low Activity Wastemore » and High-Level Waste Feed Data Quality Objectives (L&H DQO)'' (Patello et al. 1999), and ''Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO)'' (Bloom 1996). Special instructions regarding support to the LAW and HLW DQOs are provided by Baldwin (1999). Push mode core samples will be obtained from risers 15G and 150 to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples; composite the liquids and solids; perform chemical analyses on composite and segment samples; archive half-segment samples; and provide sub-samples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AY-101 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plans and are not within the scope of this SAP.« less
Isaak, Robert S; Chen, Fei; Arora, Harendra; Martinelli, Susan M; Zvara, David A; Stiegler, Marjorie P
2017-09-01
Anesthesiology residency programs may need new simulation-based programs to prepare residents for the new Objective Structured Clinical Examination (OSCE) component of the American Board of Anesthesiology (ABA) Primary Certification process. The design of such programs may require significant resources, including faculty time, expertise, and funding, as are currently needed for structured oral examination (SOE) preparation. This survey analyzed the current state of US-based anesthesiology residency programs regarding simulation-based educational programming for SOE and OSCE preparation. An online survey was distributed to every anesthesiology residency program director in the United States. The survey included 15 to 46 questions, depending on each respondent's answers. The survey queried current practices and future plans regarding resident preparation specifically for the ABA APPLIED examination, with emphasis on the OSCE. Descriptive statistics were summarized. χ and Fisher exact tests were used to test the differences in proportions across groups. Spearman rank correlation was used to examine the association between ordinal variables. The responding 66 programs (49%) were a representative sample of all anesthesiology residencies (N = 136) in terms of geographical location (χ P = .58). There was a low response rate from small programs that have 12 or fewer clinical anesthesia residents. Ninety-one percent (95% confidence interval [CI], 84%-95%) of responders agreed that it is the responsibility of the program to specifically prepare residents for primary certification, and most agreed that it is important to practice SOEs (94%; 95% CI, 88%-97%) and OSCEs (89%; 95% CI, 83%-94%). While 100% of respondents reported providing mock SOEs, only 31% (95% CI, 24%-40%) of respondents provided mock OSCE experiences. Of those without an OSCE program, 75% (95% CI, 64%-83%) reported plans to start one. The most common reasons for not having an OSCE program already in place, and the perceived challenges for implementing an OSCE program, were the same: lack of time (faculty and residents), expertise in OSCE development and assessment, and funding. The results provide data from residency programs for benchmarking their simulation curriculum and ABA APPLIED Examination preparation offerings. Despite agreement that residency programs should prepare residents for the ABA APPLIED Examination, many programs have yet to implement an OSCE preparation program, in part due to lack of financial resources, faculty expertise, and time. Additionally, in contrast to the SOE, the OSCE is a new format for ABA primary certification. As a result, the lack of consensus concerning preparation needs could be related to the amount information that is available regarding the examination content and assessment process.
Disclosing Medical Mistakes: A Communication Management Plan for Physicians
Petronio, Sandra; Torke, Alexia; Bosslet, Gabriel; Isenberg, Steven; Wocial, Lucia; Helft, Paul R
2013-01-01
Introduction: There is a growing consensus that disclosure of medical mistakes is ethically and legally appropriate, but such disclosures are made difficult by medical traditions of concern about medical malpractice suits and by physicians’ own emotional reactions. Because the physician may have compelling reasons both to keep the information private and to disclose it to the patient or family, these situations can be conceptualized as privacy dilemmas. These dilemmas may create barriers to effectively addressing the mistake and its consequences. Although a number of interventions exist to address privacy dilemmas that physicians face, current evidence suggests that physicians tend to be slow to adopt the practice of disclosing medical mistakes. Methods: This discussion proposes a theoretically based, streamlined, two-step plan that physicians can use as an initial guide for conversations with patients about medical mistakes. The mistake disclosure management plan uses the communication privacy management theory. Results: The steps are 1) physician preparation, such as talking about the physician’s emotions and seeking information about the mistake, and 2) use of mistake disclosure strategies that protect the physician-patient relationship. These include the optimal timing, context of disclosure delivery, content of mistake messages, sequencing, and apology. A case study highlighted the disclosure process. Conclusion: This Mistake Disclosure Management Plan may help physicians in the early stages after mistake discovery to prepare for the initial disclosure of a medical mistakes. The next step is testing implementation of the procedures suggested. PMID:23704848
NASA Technical Reports Server (NTRS)
1978-01-01
The Mission Control Center Shuttle (MCC) Shuttle Orbital Flight Test (OFT) Data System (OFTDS) provides facilities for flight control and data systems personnel to monitor and control the Shuttle flights from launch (tower clear) to rollout (wheels stopped on runway). It also supports the preparation for flight (flight planning, flight controller and crew training, and integrated vehicle and network testing activities). The MCC Shuttle OFTDS is described in detail. Three major support systems of the OFTDS and the data types and sources of data entering or exiting the MCC were illustrated. These systems are the communication interface system, the data computation complex, and the display and control system.
First evidence for "The backup plan paradox".
Napolitano, Christopher M; Freund, Alexandra M
2017-08-01
This research is a first test of the backup plan paradox. We hypothesized that investing in a backup plan may facilitate the conditions that it was developed to address: Plan A's insufficiency. Five studies provide initial, primarily correlative support for the undermining effect of investing in a backup plan. Study 1 (n= 160) demonstrated that the more participants perceived they had invested in developing a backup plan (preparing a "crib sheet"), the more likely they were to use it, although greater investments were unrelated to backup plan utility. Studies 2-4 used a simulated negotiation task. Study 2 (n = 247) demonstrated that when goal-relevant resources are limited, investing in developing backup plans and perceiving them as highly instrumental can decrease goal performance through the indirect effect of increased means replacing. Study 3 (n = 248) replicated this effect when goal-relevant resources were plentiful. Study 4 (n = 204) used an experimental variant of the simulated negotiation task and demonstrated that simply having a backup plan is not detrimental, but perceiving backup plans to be highly instrumental decreased goal performance, again through the indirect effect of increased means replacing. Study 5 (n = 160) replicated findings from Studies 1-4 using a lab-based motor task (throwing a ball). Together, these results provide first evidence that backup plans can introduce costs that may jeopardize goal performance. (PsycINFO Database Record (c) 2017 APA, all rights reserved).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sherman, S.J.
The scope of this document is to define a test plan for the testing of the ASEA 60/2 industrial robot at the Bardons and Oliver (B and O) cut-off lathe in Plant 6. This test plan describes the administrative procedures to be used and the general responsibilities of the Westinghouse Materials Company of Ohio (WMCO) organizations which are most involved in the preparation, coordination, and conduct of the installation, startup, and testing. Any deviations to this procedure will be approved by the test coordinator, Manager, Development, and Plant 6 Supervisor. The purpose of this test is to evaluate the ASEAmore » 60/2 industrial robot to determine the feasibility of implementing a robot at the Bardons and Oliver cut-off lathe in Plant 6 for material handling purposes. This robot will be used as a developmental robot in that it will be installed temporarily at the B and O and then be relocated to another application. The robot will be used for training purposes to familiarize personnel with programming, computer usage, maintenance, and operation of the robot. Radiation exposure reduction of the machine tool operators in Plant 6 will also be determined. Success of the testing will be measured by the amount of radiation exposure reduction and determining the complexity of incorporating automated machinery with the B and O cut-off lathe utilizing a robot.« less
Yoshida, Kunihiro; Tamai, Mariko; Kubota, Takeo; Kawame, Hiroshi; Amano, Naoji; Ikeda, Shu-ichi; Fukushima, Yoshimitsu
2002-02-01
Predictive genetic testing for hereditary neuromuscular diseases is a delicate issue for individuals at risk and their families, as well as for medical staff because these diseases are often late-onset and intractable. Therefore careful pre- and post-test genetic counseling and psychosocial support should be provided along with such genetic testing. The Division of Clinical and Molecular Genetics was established at our hospital in May 1996 to provide skilled professional genetic counseling. Since its establishment, 14 individuals have visited our clinic to request predictive genetic testing for hereditary neuromuscular diseases (4 for myotonic dystrophy, 6 for spinocerebellar ataxia, 3 for Huntington's disease, and 1 for Alzheimer's disease). The main reasons for considering testing were to remove uncertainty about the genetic status and to plan for the future. Nine of 14 individuals requested testing for making decisions about a forthcoming marriage or pregnancy (family planning). Other reasons raised by the individuals included career or financial planning, planning for their own health care, and knowing the risk for their children. At the first genetic counseling session, all of the individuals expressed hopes of not being a gene carrier and of escaping from fear of disease, and seemed not to be mentally well prepared for an increased-risk result. To date, 7 of the 14 individuals have received genetic testing and only one, who underwent predictive genetic testing for spinocerebellar ataxia, was given an increased-risk result. The seven individuals including the one with an increased-risk result, have coped well with their new knowledge about their genetic status after the testing results were disclosed. None of them has expressed regret. In pre-test genetic counseling sessions, we consider it quite important not only to determine the psychological status of the individual, but also to make the individual try to anticipate the changes in his/her life upon receiving an increased-risk or a decreased-risk result. Sufficient time should be taken to build a good relationship between the individual and his/her family and the medical staff during pre-test counseling sessions. This will help the individuals feel satisfied with their own decisions for the future, whether they receive genetic testing or not.
Ziessler, Michael; Nattkemper, Dieter; Vogt, Stefan
2012-01-01
Evidence for the anticipation of environmental effects as an integral part of response planning comes mainly from experiments in which the effects were physically presented. Thus, in these studies it cannot be excluded that effect codes were activated during response preparation only because the effects were displayed as external stimuli before response execution. In order to provide more clear-cut evidence for the anticipation of response effects in action planning, we performed a series of three experiments using a new paradigm, where displaying effect codes before the response was avoided. Participants first learned arbitrary effects of key-pressing responses. In the following test phase they were instructed to execute a response only if a Go stimulus was presented after a variable stimulus onset asynchrony (SOA). The Go stimulus was either compatible or incompatible with the effect, but independent of the response. In Experiment 1 we tested the paradigm with two responses and two effects. We found a significant compatibility effect: If the Go stimulus was compatible with the response effect, responses were initiated faster than in incompatible trials. In Experiment 2 response effects were only present in the acquisition phase, but not in the test phase. The compatibility effect disappeared, indicating that the results of Experiment 1 were indeed related to the anticipation of the forthcoming response effects. In Experiment 3 we extended this paradigm by using a larger number of stimuli and response alternatives. Again we found a robust compatibility effect, which can only be explained if the effect representations are active before response execution. The compatibility effects in Experiments 1 and 3 did not depend on the SOA. The fact that the Go stimulus affected response preparation at any time indicates that the role of effect anticipation is not limited to response selection. PMID:23293623
An Abstract Plan Preparation Language
NASA Technical Reports Server (NTRS)
Butler, Ricky W.; Munoz, Cesar A.
2006-01-01
This paper presents a new planning language that is more abstract than most existing planning languages such as the Planning Domain Definition Language (PDDL) or the New Domain Description Language (NDDL). The goal of this language is to simplify the formal analysis and specification of planning problems that are intended for safety-critical applications such as power management or automated rendezvous in future manned spacecraft. The new language has been named the Abstract Plan Preparation Language (APPL). A translator from APPL to NDDL has been developed in support of the Spacecraft Autonomy for Vehicles and Habitats Project (SAVH) sponsored by the Explorations Technology Development Program, which is seeking to mature autonomy technology for application to the new Crew Exploration Vehicle (CEV) that will replace the Space Shuttle.
(WA80 collaboration, Muenster, W. Germany, April 17--21, 1989): Foreign trip report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Young, G.R.
1989-05-11
The traveler attended a WA80 collaboration meeting held at the University of Muenster, FRG. The status of various experimental analyses was reviewed and discussed, as was the status of various papers in preparation. Plans for a joint NA35-WA80 proposal to use the lead beams to be available at the SPS in 1993 were advanced in a meeting which included several WA80 persons plus Reinhard Stock of NA35 and Rudolf Bock of GSI. Plans for a prototype of a high-resolution photon calorimeter were made. ORNL is asked to prepare much of this for a test run in December 1989. Further plansmore » for the 1990 and 1991 extended beam times at CERN with /sup 32/S were made. ORNL is asked to participate in a large upgrade of the present trigger and to collaborate with Muenster in a large upgrade and expansion of the present photon calorimeter. Other items include a rearrangement of the experimental area (GSI), new multiplicity counters (Lund-LBL), and a new data-acquisition system (GSI-Muenster).« less
25 CFR 1000.20 - What is required in a planning report?
Code of Federal Regulations, 2011 CFR
2011-04-01
... planning phase, the Tribe/Consortium must prepare and submit to the Secretary a final planning report. (a... Tribe's/Consortium's planning efforts have revealed that its current organization is adequate to assume...
FTA multi-year research program plan (FY 2009 - FY 2013).
DOT National Transportation Integrated Search
2008-09-01
The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...
DOT National Transportation Integrated Search
2009-01-01
The Flight Plan is the strategic plan for the agency, the plan to help us prepare for the future. The majority of FAAs responsibilities are our core functionsour everyday roles and responsibilitieswhich are not specifically highlighted in th...
SU-E-J-218: Novel Validation Paradigm of MRI to CT Deformation of Prostate
DOE Office of Scientific and Technical Information (OSTI.GOV)
Padgett, K; University of Miami School of Medicine - Radiology, Miami, FL; Pirozzi, S
2015-06-15
Purpose: Deformable registration algorithms are inherently difficult to characterize in the multi-modality setting due to a significant differences in the characteristics of the different modalities (CT and MRI) as well as tissue deformations. We present a unique paradigm where this is overcome by utilizing a planning-MRI acquired within an hour of the planning-CT serving as a surrogate for quantifying MRI to CT deformation by eliminating the issues of multi-modality comparisons. Methods: For nine subjects, T2 fast-spin-echo images were acquired at two different time points, the first several weeks prior to planning (diagnostic-MRI) and the second on the same day asmore » the planning-CT (planning-MRI). Significant effort in patient positioning and bowel/bladder preparation was undertaken to minimize distortion of the prostate in all datasets. The diagnostic-MRI was rigidly and deformably aligned to the planning-CT utilizing a commercially available deformable registration algorithm synthesized from local registrations. Additionally, the quality of rigid alignment was ranked by an imaging physicist. The distances between corresponding anatomical landmarks on rigid and deformed registrations (diagnostic-MR to planning-CT) were evaluated. Results: It was discovered that in cases where the rigid registration was of acceptable quality the deformable registration didn’t improve the alignment, this was true of all metrics employed. If the analysis is separated into cases where the rigid alignment was ranked as unacceptable the deformable registration significantly improved the alignment, 4.62mm residual error in landmarks as compared to 5.72mm residual error in rigid alignments with a p-value of 0.0008. Conclusion: This paradigm provides an ideal testing ground for MR to CT deformable registration algorithms by allowing for inter-modality comparisons of multi-modality registrations. Consistent positioning, bowel and bladder preparation may Result in higher quality rigid registrations than typically achieved which limits the impact of deformable registrations. In this study cases where significant differences exist, deformable registrations provide significant value.« less
48 CFR 37.604 - Quality assurance surveillance plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...
48 CFR 37.604 - Quality assurance surveillance plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...
48 CFR 37.604 - Quality assurance surveillance plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...
48 CFR 37.604 - Quality assurance surveillance plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...
48 CFR 37.604 - Quality assurance surveillance plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
..., recreation, visual resource management, public safety, law enforcement, and geographic information systems... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWY930000-L16100000-DS0000] Notice of Intent To Prepare a Resource Management Plan for the Rock Springs Field Office, Wyoming and Associated...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-25
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCOS05000 2009] Notice of Intent To Prepare a Resource Management Plan for the Uncompahgre Field Office and Associated Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with...
32 CFR Appendix D to Part 651 - Public Participation Plan
Code of Federal Regulations, 2010 CFR
2010-07-01
... involvement is a requisite element of the scoping process (40 CFR 1501.7(a)(1)). (6) Preparation of EAs will... of the preparation of environmental analyses and the tentative planning and decision-making schedule... responsible for matters related to the scoping process. If they are not the same as the proponent of the...
14 CFR 61.93 - Solo cross-country flight requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... preflight planning and preparation is correct and that the student is prepared to make the flight safely... instructor has: (1) Determined that the student's cross-country planning is correct for the flight; (2... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Solo cross-country flight requirements. 61...
14 CFR 61.93 - Solo cross-country flight requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... preflight planning and preparation is correct and that the student is prepared to make the flight safely... instructor has: (1) Determined that the student's cross-country planning is correct for the flight; (2... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Solo cross-country flight requirements. 61...
14 CFR 61.93 - Solo cross-country flight requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... preflight planning and preparation is correct and that the student is prepared to make the flight safely... instructor has: (1) Determined that the student's cross-country planning is correct for the flight; (2... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Solo cross-country flight requirements. 61...
14 CFR 61.93 - Solo cross-country flight requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... preflight planning and preparation is correct and that the student is prepared to make the flight safely... instructor has: (1) Determined that the student's cross-country planning is correct for the flight; (2... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Solo cross-country flight requirements. 61...
14 CFR 61.93 - Solo cross-country flight requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... preflight planning and preparation is correct and that the student is prepared to make the flight safely... instructor has: (1) Determined that the student's cross-country planning is correct for the flight; (2... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Solo cross-country flight requirements. 61...
76 FR 10595 - Formations of, Acquisitions by, and Mergers of Bank Holding Companies
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-25
... engage in real estate settlement servicing; trust company functions; tax planning and tax preparation..., Milwaukee, Wisconsin, and thereby engage in real estate settlement servicing; trust company functions; tax planning and tax preparation services, pursuant to sections 225.28(b)(2), (b)(5), and (b)(6) of Regulation...
42 CFR 410.68 - Antigens: Scope and conditions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... months that is— (1) Prepared for a patient by a doctor of medicine or osteopathy who has examined the patient and developed a plan of treatment including dosage levels; and (2) Administered— (i) In accord with the plan of treatment developed by the doctor of medicine or osteopathy who prepared the antigen...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-08
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Extending Scoping Period To Prepare a Programmatic Environmental Impact Statement (EIS) for the Navajo Nation Integrated Weed Management Plan Within... Integrated Weed Management Plan on the Navajo Indian Reservation. DATES: Scoping comments are due on March 20...
Failure mode analysis to predict product reliability.
NASA Technical Reports Server (NTRS)
Zemanick, P. P.
1972-01-01
The failure mode analysis (FMA) is described as a design tool to predict and improve product reliability. The objectives of the failure mode analysis are presented as they influence component design, configuration selection, the product test program, the quality assurance plan, and engineering analysis priorities. The detailed mechanics of performing a failure mode analysis are discussed, including one suggested format. Some practical difficulties of implementation are indicated, drawn from experience with preparing FMAs on the nuclear rocket engine program.
Control of Infectious Diseases in the Seven-Year Plan
1960-10-17
years of age are inoculated with the combined diphtheria-pertussis vaccine « Extensive testing of this preparation which has been accomplished in the...after careful medical examination of children before vaccination I and with proper technique of giving the inoculations the most ’ tmm Mt^^sM>mM^iml^<mW...of inactivated vaccine of the Salk type was mastered in the Soviet Union and massive inoculations were begun. During this time more than 15, 000
STS-107 Payload Specialist Ilan Ramon during TCDT
NASA Technical Reports Server (NTRS)
2002-01-01
KENNEDY SPACE CENTER, FLA. -- STS-107 Payload Specialist Ilan Ramon, the first Israeli astronaut, participates in Terminal Countdown Demonstration Test activities, a standard part of Shuttle launch preparations. STS-107 is a mission devoted to research and will include more than 80 experiments that will study Earth and space science, advanced technology development, and astronaut health and safety. Launch is planned for Jan. 16, 2003, between 10 a.m. and 2 p.m. EST aboard Space Shuttle Columbia.
ERIC Educational Resources Information Center
Congress of the U. S., Washington, DC. House Committee on Post Office and Civil Service.
This hearing, which is the first of a series of hearings on the 1990 decennial census, focuses on automation activities, pretest preparations, and proposed residency rules. Gene L. Dodaro, associate director of the General Accounting Office, calls on the committee to use special purpose tests to adequately evaluate the following: (1) potential of…
Natural Pressure-Driven Passive Bioventing
2000-09-01
8217 300’ PFFA SCALE : 1 "= 300’ LEGEND 0 ABOVE GROUND STORAGE TANK I BUILDING FENCE = = = : DRAINAGE CHANNEL \\731272\\REPORT\\FINAL\\GRA PHICS...preparation for full- scale design of a conventional bioventing system at the PFFA, a bioventing pilot test was conducted in the demonstration area prior...PFFAVW02 @ @ PFFABOS02 PFFAVMP14..6. @ PFFABOS04 • PFFABOS06 CPT-BOSSA @ PFFABOS08 ~ JM11 ~? r 1,o v SCALE IN FEET FIGURE 6 SITE PLAN PFFA
Basic research on radiant burners. Semi-annual report, through July 1991
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, J.D.
1991-10-01
Basic performance characteristics of radiant burners are explored in the broad-based study combining theoretical modeling and experimental validation of predictions. The work included fabrication of catalyzed substrates and fibers; incorporation of the catalysts into burners; testing of catalysts; and investigation of new catalyst sources. The progress of the study is detailed and further plans are outlined. A report on the preparation of palladium catalysts by Andre Blaise Kooh is included in the appendix.
MILES Training and Evaluation Test, USAREUR: Battalion Command Group Training
1980-06-01
battle. Highly artificial limitations on the re- sources available to the commander reduce the level of stress and in- volvement of the staff and could...battle but were not simulated in the field exercise. This helped stimulate staff involve- ment in the exercise, but created artificialities in the scenario...indicators that will provide the player commander and staff the necessary intellignece to do planning and any last minute changes so they are prepared to meet
Mammalian Toxicology Testing: Problem Definition Study, Personnel Plan.
1981-03-01
Technician X X Biochemist X Biologist !Bookkeeper Cage Washer X Clinical Chemist Compound Preparation Technician X Computer Cooer X Computer ...Biologist 62 Bookkeeper 60 Cage rasher 33 Clinical Chemist 26 Comp. Prep. Technician 20 Computer Coder 31 Computer Programer 31 Electron Microscope Op...29,200 * Computer Programmer BS S SFByAe 900-2.0 18,400 - $24500 e Lab Tec-inician (Chemistry) BS 5 SF Say Area 16,600- 24.000 - 14.200- ’,0 * Animal
Software engineering project management - A state-of-the-art report
NASA Technical Reports Server (NTRS)
Thayer, R. H.; Lehman, J. H.
1977-01-01
The management of software engineering projects in the aerospace industry was investigated. The survey assessed such features as contract type, specification preparation techniques, software documentation required by customers, planning and cost-estimating, quality control, the use of advanced program practices, software tools and test procedures, the education levels of project managers, programmers and analysts, work assignment, automatic software monitoring capabilities, design and coding reviews, production times, success rates, and organizational structure of the projects.
40 CFR 300.215 - Title III local emergency response plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...
40 CFR 300.215 - Title III local emergency response plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...
40 CFR 300.215 - Title III local emergency response plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...
40 CFR 300.215 - Title III local emergency response plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...
40 CFR 300.215 - Title III local emergency response plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...
The Very Specific Vortex Shedding Test on VEGA Launch Vehicle
NASA Astrophysics Data System (ADS)
Leofanti, Jose Luis; Fotio, Domenico; Grillenbeck, Anton; Dillinger, Stephan; Scaccia, Aldo
2012-07-01
When tall structures are subjected to lateral wind flow, under certain conditions, vortices are shed from alternate sides of the structure inducing periodic cross wind loads on the structure. The periodic loads, in a relatively narrow and stable frequency band, can couple with the structure’s natural frequencies. To avoid this effect the VEGA Launch System (LS) comprised a decoupling device at the launch vehicle (LV) base called Anti Vortex Shedding (AVS). During the LV-Ground Segment combined test campaign in Kourou, the LV mounted on AVS was experimentally verified, including a modal characterization test, a verification under artificial operational loads and finally tested under real wind environment. The paper gives an overview on the particular aspects of test planning, the test setup preparation inside the launch pad gantry, the test performance, test results and the conclusion for the VEGA launch system’s operational readiness.
Security Considerations and Recommendations in Computer-Based Testing
Al-Saleem, Saleh M.
2014-01-01
Many organizations and institutions around the globe are moving or planning to move their paper-and-pencil based testing to computer-based testing (CBT). However, this conversion will not be the best option for all kinds of exams and it will require significant resources. These resources may include the preparation of item banks, methods for test delivery, procedures for test administration, and last but not least test security. Security aspects may include but are not limited to the identification and authentication of examinee, the risks that are associated with cheating on the exam, and the procedures related to test delivery to the examinee. This paper will mainly investigate the security considerations associated with CBT and will provide some recommendations for the security of these kinds of tests. We will also propose a palm-based biometric authentication system incorporated with basic authentication system (username/password) in order to check the identity and authenticity of the examinee. PMID:25254250
Security considerations and recommendations in computer-based testing.
Al-Saleem, Saleh M; Ullah, Hanif
2014-01-01
Many organizations and institutions around the globe are moving or planning to move their paper-and-pencil based testing to computer-based testing (CBT). However, this conversion will not be the best option for all kinds of exams and it will require significant resources. These resources may include the preparation of item banks, methods for test delivery, procedures for test administration, and last but not least test security. Security aspects may include but are not limited to the identification and authentication of examinee, the risks that are associated with cheating on the exam, and the procedures related to test delivery to the examinee. This paper will mainly investigate the security considerations associated with CBT and will provide some recommendations for the security of these kinds of tests. We will also propose a palm-based biometric authentication system incorporated with basic authentication system (username/password) in order to check the identity and authenticity of the examinee.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1997-02-25
1.1 Purpose This Closure Report presents the information obtained from investigative actions performed to justify the decision for clean closure of CAU 430 through "No Further Action." The investigative actions were performed per the Streamlined Approach for Environmental Restoration Plan, CA UNO. 430: Buried Depleted Uranium Artille~ Round No. 1, Tonopah Test Range (DOE/NV, 1996a) (hereafter referred to as the SAFER Plan). The Buried DU Artillery Round No. 1 is located approximately 1.1 kilometers (km) (0.7 mile [mi]) south of Avenue 13 in the test area south of Area 9 (Figure 1-2). The site was thought to consist of amore » potentially unexploded W-79 Joint Test Assembly (JTA) test artillery projectile with high explosives (HE) and DU. The DU was substituted for Special Nuclear Material to prevent a nuclear explosion and yet retain the physical characteristics of uranium for ballistic and other mechanical tests. The projectile was reportedly buried in one pit, approximately 5 to 10 feet (ft) deep (Smith, 1993; Smith, 1996; Quas, 1996). The exact location of the burial pit is unknown; however, three disturbed areas (Sites A, B, and C) were identified through geophysical surveys, site visits, and employee interviews as possible locations of the test projectile (Figure 1-3). Results of the investigation are summarized within this Closure Report. Additional information about the site and investigation activities may be found in the SAFER Plan (DOE/NV, 1996a). 1.2 Scope The objectives of the SAFER Plan (DOE/NV, 1996a) activities were to prepare the site for closure through locating and identi~ing the projectile (Buried DU Artillery Round No. 1), destroying the projectile and any remaining components, collecting soil samples to detect residual contamination resulting from projectile destruction, and finally, remediating residual contamination.« less
Mapping users' expectations regarding extended-range forecasts
NASA Astrophysics Data System (ADS)
Ervasti, Tiina; Gregow, Hilppa; Vajda, Andrea; Laurila, Terhi K.; Mäkelä, Antti
2018-05-01
An online survey was used to map the needs and preferences of the Finnish general public concerning extended-range forecasts and their presentation. First analyses of the survey were used to guide the co-design process of novel extended-range forecasts to be developed and tested during the project. In addition, the survey was used to engage the respondents from the general public to participate in a one year piloting phase that started in June 2017. The respondents considered that the tailored extended-range forecasts would be beneficial in planning activities, preparing for the weather risks and scheduling the everyday life. The respondents also perceived the information about the impacts of weather conditions more important than advice on how to prepare for the impacts.
Biomass power for rural development. Technical progress report, July 1--September 30, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
The focus of the DOE/USDA sponsored biomass power for rural development project is to develop commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC).more » Phase-2 of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is underway. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-3 will represent fullscale commercialization of the energy crop and power generation on a sustainable basis. During the third quarter of 1997, much of the Consortium`s effort has focused on outreach activities, continued feedstock development, fuel supply planning, and fuel contract development, and preparation for 1998 scale-up activities. The Consortium also submitted a Phase-1 extension proposal during this period. A few of the more important milestones are outlined below. The fourth quarter of 1997 is expected to be dominated by Phase-II proposal efforts and planning for 1998 activities.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Source Survelliance § 51.210 General. Each plan... portion of the control strategy. Specifically, the plan must meet the requirements of this subpart. ...
Miller, Matthew; DuVall, Nicholas; Brewster, John; Wajdowicz, Michael N; Harris, Ashley; Roberts, Howard W
2018-02-18
To evaluate bicuspid axial wall height effect on the fracture mode of adhesively luted, all-ceramic CAD/CAM crowns with a 20° total occlusal convergence (TOC). Recently extracted premolars were randomly divided into 4 groups (n = 12) with all-ceramic crown preparations accomplished using a high-speed handpiece inserted into a milling device. Specimens were prepared containing occlusogingival axial wall heights of 3, 2, and 1 mm as well as a group containing a flat preparation surface with no axial wall height. All preparations contained a 20° TOC. Completed preparation surface area was determined, and preparation features confirmed using a digital measuring microscope. Scanned preparations (CEREC) were fitted with milled and crystallized lithium disilicate full coverage restorations and luted with a self-etching adhesive resin cement after hydrofluoric acid etching and silanation. All manufacturer recommendations were followed. Specimens were stored at 37°C/98% humidity for 24 hours. Specimens were tested to failure at a 45° angle to the long axis of the tooth root on a universal testing machine. Failure load was converted to MPa using the available bonding surface area with mean data analyzed using Kruskal-Wallis/Dunn's (p = 0.05) RESULTS: The 3 mm preparation height specimens were similar to the 2 mm specimens, and both demonstrated significantly stronger failure load than the 1 mm axial wall height and flat preparation specimens. The flat preparation and 1 mm axial wall height specimens all failed adhesively, while the 2 mm and 3 mm specimens failed largely due to tooth fracture. Further evidence is provided that CAD/CAM adhesive techniques may compensate for less than ideal preparation features. Under the conditions of this study, bicuspid preparations with a 20° TOC restored with adhesively luted, CAD/CAM e.max CAD crowns require at least 2 mm of axial wall height, but further planned fatigue studies are necessary before definitive recommendations can be made. © 2018 by the American College of Prosthodontists.
1992-08-07
AD-A5 6 ... 1... . .. .. .... INSTALLATION RESTORATION PROGRAM (IRP) STAGE 3 7m~ QUALITY ASSURANCE -k- PROJECT PLAN for McCLELLAN AFB , CALIFORNIA...FINAL.. S AUG 2. 1 1992 L PREPARED FOR: .... ... McCLELLAN AFB IEM McCLELLAN AFB , CALIFORNIA 9652-599 ................... fr pu licrele se...PLAN FINAL ’’ : " FOR McCLELLAN AFB /EM McCLELLAN AFB , CALIFORNIA 95652-5990 August 1992 AUG 2 11992 PREPARED BY: DI Radian Corporation10389 Old
Sudore, Rebecca L; Boscardin, John; Feuz, Mariko A; McMahan, Ryan D; Katen, Mary T; Barnes, Deborah E
2017-08-01
Documentation rates of patients' medical wishes are often low. It is unknown whether easy-to-use, patient-facing advance care planning (ACP) interventions can overcome barriers to planning in busy primary care settings. To compare the efficacy of an interactive, patient-centered ACP website (PREPARE) with an easy-to-read advance directive (AD) to increase planning documentation. This was a comparative effectiveness randomized clinical trial from April 2013 to July 2016 conducted at multiple primary care clinics at the San Francisco VA Medical Center. Inclusion criteria were age of a least 60 years; at least 2 chronic and/or serious conditions; and 2 or more primary care visits; and 2 or more additional clinic, hospital, or emergency room visits in the last year. Participants were randomized to review PREPARE plus an easy-to-read AD or the AD alone. There were no clinician and/or system-level interventions or education. Research staff were blinded for all follow-up measurements. The primary outcome was new ACP documentation (ie, legal forms and/or discussions) at 9 months. Secondary outcomes included patient-reported ACP engagement at 1 week, 3 months, and 6 months using validated surveys of behavior change process measures (ie, 5-point knowledge, self-efficacy, readiness scales) and action measures (eg, surrogate designation, using a 0-25 scale). We used intention-to-treat, mixed-effects logistic and linear regression, controlling for time, health literacy, race/ethnicity, baseline ACP, and clustering by physician. The mean (SD) age of 414 participants was 71 (8) years, 38 (9%) were women, 83 (20%) had limited literacy, and 179 (43%) were nonwhite. No participant characteristic differed significantly among study arms at baseline. Retention at 6 months was 90%. Advance care planning documentation 6 months after enrollment was higher in the PREPARE arm vs the AD-alone arm (adjusted 35% vs 25%; odds ratio, 1.61 [95% CI, 1.03-2.51]; P = .04). PREPARE also resulted in higher self-reported ACP engagement at each follow-up, including higher process and action scores; P <.001 at each follow-up). Easy-to-use, patient-facing ACP tools, without clinician- and/or system-level interventions, can increase planning documentation 25% to 35%. Combining the PREPARE website with an easy-to-read AD resulted in higher planning documentation than the AD alone, suggesting that PREPARE may increase planning documentation with minimal health care system resources. clinicaltrials.gov Identifier: NCT01550731.
PM-1 NUCLEAR POWER PLANT PROGRAM. Quarterly Progress Report No. 2 for June 1 to August 31, 1959
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sieg, J.S.; Smith, E.H.
1959-10-01
The objective of the contract is the design, development, fabrication, installation, and initial testing and operation of a prepackaged air- transportable pressurized water reactor nuclear power plant, the PM-1. The specified output is 1 Mwe and 7 million Btu/hr of heat. The plant is to be operational by March 1962. The principal efforts were completion of the plant parametric study and preparation of the preliminary design. A summary of design parameters is given. Systems development work included study and selection of packages for full-scale testing, a survey of in-core instrumentation techniques, control and instrumentation development, and development of components formore » the steam generator, condenser, and turbine generator, which are not commercially available. Reactor development work included completion of the parametric zeropower experiments and preparrtions for a flexible zeropower test program, a revision of plans for irradiation testing PM-1 fuel elements, initiation of a reactor flow test program, outliring of a heat tnansfer test program, completion of the seven-tube test section (SETCH-1) tests, and evaluation of control rod actuators leading to specification of a magnetic jack-type control rod drive similar to that reported in ANL-5768. Completion of the prelimirary design led to initiation of the final design effort, which will be the principal activity during the next two project quarters. Preparations for core fabrication included procurement of core cladding material for the zero-power teat core, arrangement with a subcontractor to convent UF/sub 6/ to UO/sub 2/ and to commence delivery of the oxide during the next quarter, development of fuel element fabrication and ultrasonic testing techniques, study of control rod materials, UO/sub 2/ recovery techniques, and boron analysis methods. Preliminary work on site preparation was pursued with receipt of USAEC approval for a location on the eastern slope of Warren Peak at Sundance, Wyoming. A survey of this site is underway. A preliminary Hazards Summary Report is in preparation. (For preceding period see MND-M-1812.) (auth)« less
2016-01-20
Engineers for NASA's MarCO (Mars Cube One) technology demonstration inspect the MarCO test bed, which contains components that are identical to those built for a flight to Mars. Cody Colley, left, MarCO integration and test deputy, and Shannon Statham, MarCO integration and test lead, are on the team at NASA's Jet Propulsion Laboratory, Pasadena, California, preparing twin MarCO CubeSats. The briefcase-size MarCO twins were designed to ride along with NASA's next Mars lander, InSight. Its planned March 2016 launch was suspended. InSight -- an acronym for Interior Exploration using Seismic Investigations, Geodesy and Heat Transport -- will study the interior of Mars to improve understanding of the processes that formed and shaped rocky planets, including Earth. Note: After thorough examination, NASA managers have decided to suspend the planned March 2016 launch of the Interior Exploration using Seismic Investigations Geodesy and Heat Transport (InSight) mission. The decision follows unsuccessful attempts to repair a leak in a section of the prime instrument in the science payload. http://photojournal.jpl.nasa.gov/catalog/PIA20341
The Myth of Employee Planning for Retirement
ERIC Educational Resources Information Center
Morrison, Malcolm H.
1975-01-01
A survey of male hourly-wage earners indicates employees face serious problems in planning for income security in retirement. Retirement preparation programs that supply information and technical planning expertise are needed to assist employees in realistic retirement planning. (EA)
Maritime transport in the Gulf of Bothnia 2030.
Pekkarinen, Annukka; Repka, Sari
2014-10-01
Scenarios for shipping traffic in the Gulf of Bothnia (GoB) by 2030 are described in order to identify the main factors that should be taken into account when preparing a Maritime Spatial Plan (MSP) for the area. The application of future research methodology to planning of marine areas was also assessed. The methods include applying existing large scale quantitative scenarios for maritime traffic in the GoB and using real-time Delphi in which an expert group discussed different factors contributing to future maritime traffic in the GoB to find out the probability and significance of the factors having an impact on maritime traffic. MSP was tested on transnational scale in the Bothnian sea area as a pilot project.
Polar tent for reduced perturbation of NIF ignition capsules
NASA Astrophysics Data System (ADS)
Hammel, B. A.; Pickworth, L.; Stadermann, M.; Field, J.; Robey, H.; Scott, H. A.; Smalyuk, V.
2016-10-01
In simulations, a tent that contacts the capsule near the poles and departs tangential to the capsule surface greatly reduces the capsule perturbation, and the resulting mass injected into the hot-spot, compared to current capsule support methods. Target fabrication appears feasible with a layered tent (43-nm polyimide + 8-nm C) for increased stiffness. We are planning quantitative measurements of the resulting shell- ρR perturbation near peak implosion velocity (PV) using enhanced self-emission backlighting, achieved by adding 1% Ar to the capsule fill in Symcaps (4He + H). Layered DT implosions are also planned for an integrated test of capsule performance. We will describe the design and simulation predictions. Prepared by LLNL under Contract DE-AC52-07NA27344.
10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2012 CFR
2012-01-01
... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...
10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2013 CFR
2013-01-01
... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...
10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) A cyber security plan in accordance with the criteria set forth in § 73.54 of this chapter; (iv) A... cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan, shall protect the plans and...
10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2014 CFR
2014-01-01
... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...
van Belle, Elise; Zwakhalen, Sandra M G; Caris, Josien; Van Hecke, Ann; Huisman-de Waal, Getty; Heinen, Maud
2018-02-01
To describe the tailoring of the Tell-us Card intervention for enhanced patient participation to the Dutch hospital setting using Intervention Mapping as a systematic approach. Even though patient participation is essential in any patient-to-nurse encounter, care plans often fail to take patients' preferences into account. The Tell-us Card intervention seems promising, but needs to be tailored and tested before implementation in a different setting or on large scale. Description of the Intervention Mapping framework to systematically tailor the Tell-us Card intervention to the Dutch hospital setting. Intervention Mapping consists of: (i) identification of the problem through needs assessment and determination of fit, based on patients and nurses interviews and focus group interviews; (ii) developing a logic model of change and matrices, based on literature and interviews; (iii) selection of theory-based methods and practical applications; (iv) producing programme components and piloting; (v) planning for adoption, implementation and sustainability; and (vi) preparing for programme evaluation. Knowledge, attitude, outcome expectations, self-efficacy and skills were identified as the main determinants influencing the use of the Tell-us Card. Linking identified determinants and performance objectives with behaviour change techniques from the literature resulted in a well-defined and tailored intervention and evaluation plan. The Tell-us Card intervention was adapted to fit the Dutch hospital setting and prepared for evaluation. The Medical Research Council framework was followed, and the Intervention Mapping approach was used to prepare a pilot study to confirm feasibility and relevant outcomes. This article shows how Intervention Mapping is applied within the Medical Research Council framework to adapt the Tell-us Card intervention, which could serve as a guide for the tailoring of similar interventions. © 2017 John Wiley & Sons Ltd.
25 CFR 700.93 - Relocation plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false Relocation plan. 700.93 Section 700.93 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES General Policies and Instructions Definitions § 700.93 Relocation plan. The relocation plan shall be the plan prepared...
A District Level Planning Model.
ERIC Educational Resources Information Center
McHenry, W. E.; Achilles, C. M.
This report examines school district planning models in South Carolina. It focuses on three questions: (1) Of those school districts conducting some type of systematic planning, how many are producing strategic plans? Long-range plans? Accountability reports? (2) In those same districts, how many are preparing adequate program-management…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-15
... Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San Bernardino County... Resources Management Plan/Environmental Impact Statement for Mojave National Preserve. SUMMARY: Pursuant to... preparing a Water Resources Management Plan/Environmental Impact Statement (WRMP/EIS). This plan is intended...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-13
... Management Area boundary determination; Travel management system to accommodate many uses while maintaining... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCOS06000 L12200000.DP0000] Notice of Intent To Amend the Resource Management Plan for the Gunnison Field Office and Prepare an Associated...
ERIC Educational Resources Information Center
Macconnell, James D., And Others
The twelfth in a series also including guides for facilities for medical x-ray technologist, medical assistant, and medical secretary programs, the document is intended for use in the preparation of educational specifications for facilities for dental laboratory technician programs. Designed for use by those responsible for planning facilities,…
ERIC Educational Resources Information Center
Morris, Anne K.; Hiebert, James
2017-01-01
We investigated whether the content pre-service teachers studied in elementary teacher preparation mathematics courses was related to their performance on a mathematics lesson planning task 2 and 3 years after graduation. The relevant mathematics knowledge was studied when the teachers were freshmen, 5 to 6 years earlier. Results showed that when…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-28
... involved in the planning process: Renewable energy, lands and realty, minerals management, outdoor... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNVS00000 L19200000.PH0000 LRSNCI530800 241A; 10-08807; MO 4500012623; TAS: 14X1109] Notice of Intent To Prepare a Recreation Area Management...
A National Periodicals Center Technical Development Plan.
ERIC Educational Resources Information Center
Council on Library Resources, Inc., Washington, DC.
This technical plan for developing, managing, and operating a national periodicals center (NPC), which was prepared at the request of the Library of Congress, is designed so that it could be used by the Library or any other agency prepared to assume responsibility for the creation of a major periodicals facility. The overall goal of the NPC is to…
49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...
49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...
49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...
49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...
49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-19
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNML00000 L16100000.DS0000] Notice of Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent. SUMMARY: In...
Status of Individuals' Planning to Prepare for Retirement in Turkey
ERIC Educational Resources Information Center
Gunay, Gulay; Bener, Ozgun
2008-01-01
This research was conducted in Ankara province for the purpose of examining the status of planning in preparation for retirement as an individual and as a family of individuals who show differences in educational level. Individuals who lived in Ankara province, who were 3 years from retirement according to age limit, and who had social security…
Preparing for the Market. Teacher Edition. Fashion Buying Series.
ERIC Educational Resources Information Center
Collins, Cindy
This teacher's guide presents material for a unit on preparing for the retail fashion market. Content focuses on merchandise plans, computing open-to-buy, computing turnover, the components of a model stock plan, and criteria used when selecting a supplier. The guide contains 5 objectives, 6 group learning activities keyed to the objectives, 21…
ERIC Educational Resources Information Center
Ab-Rahman, Mohammad Syuhaimi; Yusoff, Abdul Rahman Mohd; Abdul, Nasrul Amir; Hipni, Afiq
2015-01-01
Development of a robust platform is important to ensure that the engineering accreditation process can run smoothly, completely and the most important is to fulfill the criteria requirements. In case of Malaysia, the preparation for EAC (Engineering Accreditation Committee) assessment required a good strategic plan of academic management system…
Down the Road...Long Range Planning for Automation.
ERIC Educational Resources Information Center
Texas State Library, Austin. Dept. of Library Development.
The materials in this manual/workbook were prepared to assist participants in a workshop on long-range planning for library automation. Chapters cover the following topics: (1) "What Is Long-Range Planning?" (2) "Why Plan?" (3) "Who Needs to Participate?" (4) "Planning to Plan"; (5) "Determining Needs"; (6) "Description and Introduction"; (7)…
Teacher Performance Assessment Instruments: Plans for Practice Rating.
ERIC Educational Resources Information Center
Capie, William; And Others
This manual consists of lesson plans developed to train data collectors in the use of the Teacher Performance Assessment Instruments (TPAI). Each set of plans was designed for one of three purposes. Lesson plans developed for the Teaching Plans and Materials Instrument (TPM) simulate a portfolio prepared by the teacher. One-day plans developed for…
Climate Action Planning Process | Climate Neutral Research Campuses | NREL
Action Planning Process Climate Action Planning Process For research campuses, NREL has developed a five-step process to develop and implement climate action plans: Determine baseline energy consumption Analyze technology options Prepare a plan and set priorities Implement the climate action plan Measure and
Full-Scale Test and Analysis of a PRSEUS Fuselage Panel to Assess Damage-Containment Features
NASA Technical Reports Server (NTRS)
Bergan, Andrew; Bakuckas, John G.; Lovejoy, Andrew E.; Jegley, Dawn C.; Linton, Kim A.; Korkosz, Gregory; Awerbuch, Jonathan; Tan, Tein-Min
2011-01-01
Stitched composite technology has the potential to substantially decrease structural weight through enhanced damage containment capabilities. The most recent generation of stitched composite technology, the Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) concept, has been shown to successfully arrest damage at the sub-component level through tension testing of a three stringer panel with damage in the form of a two-bay notch. In a joint effort undertaken by the National Aeronautics and Space Administration (NASA), the Federal Aviation Administration (FAA), and the Boeing Company, further studies are being conducted to characterize the damage containment features of the PRSEUS concept. A full-scale residual strength test will be performed on a fuselage panel to determine if the load capacity will meet strength, deformation, and damage tolerance requirements. A curved panel was designed, fabricated, and prepared for residual strength testing. A pre-test Finite Element Model (FEM) was developed using design allowables from previous test programs to predict test panel deformation characteristics and margins of safety. Three phases of testing with increasing damage severity include: (1) as manufactured; (2) barely visible impact damage (BVID) and visible impact damage (VID); and (3) discrete source damage (DSD) where the panel will be loaded to catastrophic failure. This paper presents the background information, test plan, and experimental procedure. This paper is the first of several future articles reporting the test preparations, results, and analysis conducted in the test program.
NASA Technical Reports Server (NTRS)
Vanvalkenburgh, C. N.
1984-01-01
Underwater simulations of EVA contingency operations such as manual jettison, payload disconnect, and payload clamp actuation were used to define crew aid needs and mockup pecularities and characteristics to verify the validity of simulation using the trainer. A set of mockup instrument pointing system tests was conducted and minor modifications and refinements were made. Flight configuration struts were tested and verified to be operable by the flight crew. Tasks involved in developing the following end items are described: IPS gimbal system, payload, and payload clamp assembly; the igloos (volumetric); spacelab pallets, experiments, and hardware; experiment, and hardware; experiment 7; and EVA hand tools, support hardware (handrails and foot restraints). The test plan preparation and test support are also covered.
29 CFR 2520.101-6 - Multiemployer pension plan information made available on request.
Code of Federal Regulations, 2011 CFR
2011-07-01
... “periodic actuarial report” means any— (i) Actuarial report prepared by an actuary of the plan and received... plan from an actuary of the plan that depicts alternative funding scenarios based on a range of...
29 CFR 2520.101-6 - Multiemployer pension plan information made available on request.
Code of Federal Regulations, 2010 CFR
2010-07-01
... “periodic actuarial report” means any— (i) Actuarial report prepared by an actuary of the plan and received... plan from an actuary of the plan that depicts alternative funding scenarios based on a range of...
Identification challenges for large space structures
NASA Technical Reports Server (NTRS)
Pappa, Richard S.
1990-01-01
The paper examines the on-orbit modal identification of large space structures, stressing the importance of planning and experience, in preparation for the Space Station Structural Characterization Experiment (SSSCE) for the Space Station Freedom. The necessary information to foresee and overcome practical difficulties is considered in connection with seven key factors, including test objectives, dynamic complexity of the structure, data quality, extent of exploratory studies, availability and understanding of software tools, experience with similar problems, and pretest analytical conditions. These factors affect identification success in ground tests. Comparisons with similar ground tests of assembled systems are discussed, showing that the constraints of space tests make these factors more significant. The absence of data and experiences relating to on-orbit modal identification testing is shown to make identification a uniquely mathematical problem, although all spacecraft are constructed and verified by proven engineering methods.
NASA Astrophysics Data System (ADS)
1990-10-01
The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.
Dynamic simulations for preparing the acceptance test of JT-60SA cryogenic system
NASA Astrophysics Data System (ADS)
Cirillo, R.; Hoa, C.; Michel, F.; Poncet, J. M.; Rousset, B.
2016-12-01
Power generation in the future could be provided by thermo-nuclear fusion reactors like tokamaks. There inside, the fusion reaction takes place thanks to the generation of plasmas at hundreds of millions of degrees that must be confined magnetically with superconductive coils, cooled down to around 4.5 K. Within this frame, an experimental tokamak device, JT-60SA is currently under construction in Naka (Japan). The plasma works cyclically and the coil system is subject to pulsed heat loads. In order to size the refrigerator close to the average power and hence optimizing investment and operational costs, measures have to be taken to smooth the heat load. Here we present a dynamic model of the JT-60SA's Auxiliary Cold box (ACB) for preparing the acceptance tests of the refrigeration system planned in 2016 in Naka. The aim of this study is to simulate the pulsed load scenarios using different process controls. All the simulations have been performed with EcosimPro® and the associated cryogenic library: CRYOLIB.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Work plans. 35.107 Section 35.107... ASSISTANCE Environmental Program Grants Preparing An Application § 35.107 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional Administrator and...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Work plans. 35.507 Section 35.507... ASSISTANCE Environmental Program Grants for Tribes Preparing An Application § 35.507 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Work plans. 35.507 Section 35.507... ASSISTANCE Environmental Program Grants for Tribes Preparing An Application § 35.507 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Work plans. 35.107 Section 35.107... ASSISTANCE Environmental Program Grants Preparing An Application § 35.107 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional Administrator and...
A Call for Research on Planned vs. Unplanned Suicidal Behavior
ERIC Educational Resources Information Center
Conner, Kenneth R.
2004-01-01
Unplanned acts of suicidal behavior involve little preparation or forethought whereas planned acts may be carefully conceived and implemented. Planned acts are associated with greater depression, hopelessness, and lethality, but there are meager data on other factors associated with planning. The prevention of planned and unplanned acts may…
24 CFR 599.507 - Tax incentives utilization plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Tax incentives utilization plan....507 Tax incentives utilization plan. (a) Preliminary plan. Within six months of designation, the CoRA must prepare and submit to HUD a preliminary tax incentives utilization plan for achieving the State...
Understanding Preservice Teacher Skills to Construct Lesson Plans
ERIC Educational Resources Information Center
Lim, Woong; Son, Ji-Won; Kim, Dong-Joong
2018-01-01
This study examined preservice teachers' (PSTs) capacity for lesson planning in a university-based teacher preparation program in the USA Participants (n = 126) wrote lesson plans in three approaches: synthesis, creation, and modification. Findings indicate that PSTs who modified preexisting lesson plans produced better lesson plans than their…
Planning and Decision Making for Care Transitions
Sörensen, Silvia; Mak, Wingyun; Pinquart, Martin
2015-01-01
The need to plan for future health care and residential adjustments increases with age, growing frailty, and restrictions in coverage of long-term care and will continue to grow with population aging. Older adults’ lack of financial preparation for health care costs, insufficient knowledge about available options, and inadequate communication about care-related values has become an increasing public health challenge. This chapter describes a model of Preparation for Future Care (PFC), which encompasses different levels and domains of planning. Research about the extent to which planning is helpful in navigating care transitions is reviewed, and barriers and facilitators of planning including individual, familial, cultural, and national long-term care policy factors are discussed. Planning in the context of dementia and practical approaches that can be taken to enhance PFC is addressed, as well as recommendations for future research in the area of planning and decision making in the context of care transitions. PMID:26207079
2002-12-18
KENNEDY SPACE CENTER, FLA. -- -- STS-107 Pilot William "Willie" McCool operates an M113 armored personnel carrier during Terminal Countdown Demonstration Test activities, a standard part of launch preparations. Instructor George Hoggard (left) supervises the training. STS-107 is a mission devoted to research and will include more than 80 experiments that will study Earth and space science, advanced technology development, and astronaut health and safety. Launch is planned for Jan. 16, 2003, between 10 a.m. and 2 p.m. EST aboard Space Shuttle Columbia.
2002-12-18
KENNEDY SPACE CENTER, FLA. -- STS-107 Mission Specialist Laurel Clark (in yellow cap) is instructed on the operation of an M113 armored personnel carrier during Terminal Countdown Demonstration Test activities, a standard part of launch preparations. STS-107 is a mission devoted to research and will include more than 80 experiments that will study Earth and space science, advanced technology development, and astronaut health and safety. Launch is planned for Jan. 16, 2003, between 10 a.m. and 2 p.m. EST aboard Space Shuttle Columbia.
2002-12-18
KENNEDY SPACE CENTER, FLA. -- -- STS-107 Mission Specialist David Brown takes a break during training on the operation of an M113 armored personnel carrier during Terminal Countdown Demonstration Test activities, a standard part of launch preparations. STS-107 is a mission devoted to research and will include more than 80 experiments that will study Earth and space science, advanced technology development, and astronaut health and safety. Launch is planned for Jan. 16, 2003, between 10 a.m. and 2 p.m. EST aboard Space Shuttle Columbia.
2002-12-18
KENNEDY SPACE CENTER, FLA. -- -- STS-107 Payload Commander Michael Anderson takes a break during training on the operation of an M113 armored personnel carrier during Terminal Countdown Demonstration Test activities, a standard part of launch preparations. STS-107 is a mission devoted to research and will include more than 80 experiments that will study Earth and space science, advanced technology development, and astronaut health and safety. Launch is planned for Jan. 16, 2003, between 10 a.m. and 2 p.m. EST aboard Space Shuttle Columbia.
2002-12-18
KENNEDY SPACE CENTER, FLA. -- STS-107 Mission Specialist Kalpana Chawla takes a break during training on the operation of an M113 armored personnel carrier during Terminal Countdown Demonstration Test activities, a standard part of launch preparations. STS-107 is a mission devoted to research and will include more than 80 experiments that will study Earth and space science, advanced technology development, and astronaut health and safety. Launch is planned for Jan. 16, 2003, between 10 a.m. and 2 p.m. EST aboard Space Shuttle Columbia.
2002-12-18
KENNEDY SPACE CENTER, FLA. -- STS-107 Payload Specialist Ilan Ramon, the first Israeli astronaut, takes a break during training on the operation of an M113 armored personnel carrier during Terminal Countdown Demonstration Test activities, a standard part of launch preparations. STS-107 is a mission devoted to research and will include more than 80 experiments that will study Earth and space science, advanced technology development, and astronaut health and safety. Launch is planned for Jan. 16, 2003, between 10 a.m. and 2 p.m. EST aboard Space Shuttle Columbia.
2002-12-18
KENNEDY SPACE CENTER, FLA. -- -- STS-107 Pilot William "Willie" McCool takes a break during training on the operation of an M113 armored personnel carrier during Terminal Countdown Demonstration Test activities, a standard part of launch preparations. STS-107 is a mission devoted to research and will include more than 80 experiments that will study Earth and space science, advanced technology development, and astronaut health and safety. Launch is planned for Jan. 16, 2003, between 10 a.m. and 2 p.m. EST aboard Space Shuttle Columbia.
NASA Technical Reports Server (NTRS)
1979-01-01
Program elements of the power module (PM) system, are identified, structured, and defined according to the planned work breakdown structure. Efforts required to design, develop, manufacture, test, checkout, launch and operate a protoflight assembled 25 kW, 50 kW and 100 kW PM include the preparation and delivery of related software, government furnished equipment, space support equipment, ground support equipment, launch site verification software, orbital verification software, and all related data items.
NASA Technical Reports Server (NTRS)
Lewis, Pattie
2005-01-01
Headquarters National Aeronautics and Space Administration (NASA) chartered the Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objectives of the AP2 Office are to: (1) Reduce or eliminate the use of hazardous materials (HazMats) or hazardous processes at manufacturing, remanufacturing, and sustainment locations. (2) Avoid duplication of effort in actions required to reduce or eliminate HazMats through joint center cooperation and technology sharing. To achieve a substrate condition suitable for the application of a coating system, both new and old (in-situ) substrates must undergo some type of surface preparation and/or depainting operation to ensure adhesion of the new coating system. The level of cleanliness or anchor profile desired is typically a function of the type of coating to be applied and the specification being adhered to. In high performance environments, cleanliness and surface profile requirements for carbon steel (the dominant substrate for facilities, structures and equipment) dictates the use of abrasive media. Many of the abrasive media currently used across NASA and Air Force Space Command (AFSPC) installations generate large quantities of fugitive particulate emissions and waste. The high quantities of airborne dust and waste generated from these operations pose significant environmental concern. Efforts to contain emissions and the reduce quantity of waste generated have significant implications on project cost; this is often a deterrent to engaging in maintenance activities. In response to recent technological developments and NASA's and AFSPC's need to undertake environmentally conscious corrosion prevention projects, a review of the industry needs to be undertaken to evaluate surface preparation technologies (materials and processes) for embrace. This project will identify, evaluate and approve alternative surface preparation technologies for use at NASA and AFSPC installations. Materials and processes will be evaluated with the goal of selecting those processes that will improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination and reduce the amount of hazardous waste generated. This Field Evaluations Test Plan defines the field evaluation and testing requirements for validating alternative surface preparation/depainting technologies and supplements the JTP. The field evaluations will be performed at Stennis Space Center, Mississippi, under the oversight of the Project Engineer. Additional field evaluations may be performed at other NASA centers or AFSPC facilities.
Defense.gov - Special Report: VOTE
Voting Action Plan (pdf) 2013 USMC Voting Action Plan (pdf) 2013 Army Voting Action Plan (pdf) Air Force Voting Plan 2012-13 (pdf) Army Voting Action Plan 2012 (pdf) Marine Corps Voting Action Plan 2012 (pdf ) Navy Voting Action Plan (pdf) Overseas Vote Foundation Project Vote Smart Preparing for the 2012
With Worldmaking, Planning Models Matter.
ERIC Educational Resources Information Center
Cain, Beatrice Naff
1989-01-01
Examines two different planning models (creative and rational means-end) used in a teacher preparation program to determine what influence the different planning models had on preservice English teachers' thinking before, during, and after teaching. Finds the creative planning model more effectively encourages active worldmaking. (MS)
32 CFR 536.19 - Disaster claims planning.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 3 2010-07-01 2010-07-01 true Disaster claims planning. 536.19 Section 536.19... AGAINST THE UNITED STATES The Army Claims System § 536.19 Disaster claims planning. All ACOs will prepare... requirements related to disaster claims planning. ...
Manual for Preparing Individualized Education Programs.
ERIC Educational Resources Information Center
Baylor, Terrill D.
Presented are guidelines for developing an individualized program and services plan, an individual implementation plan, and daily activity and strategy plans for handicapped students. Instructions are outlined for utilizing forms related to planning and implementation of individualized education programs. Appended are sample forms. (SBH)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-01
... National Forest; California; Piute Mountains Travel Management Plan; Correction AGENCY: Forest Service... intent to prepare an environmental impact statement for the Piute Mountains Travel Management Plan. FOR...
Best practices in developing regional transportation plans
DOT National Transportation Integrated Search
2001-09-01
AltAlthough Regional Transportation Plans (RTPs) have been prepared for many decades, there has been little effort to comprehensively compare and evaluate the different features of these documents. Most Metropolitan Planning Organizations (MPO) typic...
Heat Pipe Powered Stirling Conversion for the Demonstration Using Flattop Fission (DUFF) Test
NASA Technical Reports Server (NTRS)
Gibson, Marc A.; Briggs, Maxwell H.; Sanzi, James L.; Brace, Michael H.
2013-01-01
Design concepts for small Fission Power Systems (FPS) have shown that heat pipe cooled reactors provide a passive, redundant, and lower mass option to transfer heat from the fuel to the power conversion system, as opposed to pumped loop designs typically associated with larger FPS. Although many systems have been conceptually designed and a few making it to electrically heated testing, none have been coupled to a real nuclear reactor. A demonstration test named DUFF Demonstration Using Flattop Fission, was planned by the Los Alamos National Lab (LANL) to use an existing criticality experiment named Flattop to provide the nuclear heat source. A team from the NASA Glenn Research Center designed, built, and tested a heat pipe and power conversion system to couple to Flattop with the end goal of making electrical power. This paper will focus on the design and testing performed in preparation for the DUFF test.
ERIC Educational Resources Information Center
Storfer-Isser, Amy; Musher-Eizenman, Dara
2013-01-01
Objective: To examine the psychometric properties of 9 quantitative items that assess time scarcity and fatigue as parent barriers to planning and preparing meals for their children. Methods: A convenience sample of 342 parents of children aged 2-6 years completed a 20-minute online survey. Exploratory factor analysis was used to examine the…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-15
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-5-000] Empire Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Planned Tioga County Extension Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting April 7, 2010. The staff of the Federal Energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-06
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-6-000] Wabash Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Wabash Gas Storage Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-31
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF14-4-000] Paiute Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned 2015 Elko Area Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-11
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Leader One Energy, LLC] Notice of Intent to Prepare an Environmental Assessment for the Planned Leader One Gas Storage Project, Request for Comments on Environmental Issues, and Notice of a Site Visit April 30, 2010. The staff of the Federal Energy Regulatory Commission (FERC or...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-15
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-19-000] Equitrans, L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned Sunrise Pipeline Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting September 3, 2010. The staff of the Federal Energy Regulatory...
School Library Media Center Disaster Response Plan Handbook.
ERIC Educational Resources Information Center
Illinois School Library Media Association, Fairfield.
The best way to deal with a disaster or an emergency is to be prepared. Librarians must be aware of the emergencies which could arise, be ready to respond to them when they occur, and recover from them afterwards. Guidelines are offered by the Illinois School Library Media Association (ISLMA) to assist in the preparation of a disaster plan and the…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-30
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [L51010000-FX0000-LVRWA09A2590-LLAZC02000; AZA34666] Notice of Intent To Prepare a Possible Land Use Plan Amendment in Conjunction With the Proposed...), in conjunction with the Quartzsite Solar Energy Project (QSEP), and by this notice is announcing the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAKA01200.L12200000.DP0000] Notice of Intent To Prepare an Amendment to the Ring of Fire Resource Management Plan for the Campbell Tract Facility, Anchorage, AK AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Intent. SUMMARY: The...
ERIC Educational Resources Information Center
Sias, Christina M.; Nadelson, Louis S.; Juth, Stephanie M.; Seifert, Anne L.
2017-01-01
Students need to be prepared for the 21st century by developing the literacy skills necessary for participating in the age of synthesis--an age that requires a progressive set of skills and knowledge. The authors identified nine educational innovations that are perceived to be effective for preparing students for the 21st century age of synthesis…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... Gas Company; Notice of Intent To Prepare an Environmental Assessment for the Planned West Leg 2014... environmental assessment (EA) that will discuss the environmental impacts of the planned West Leg 2014 Expansion...-down menu, select ``West Leg 2014''. Northern may be contacted directly at 1-888-367-6671 or by email...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
...; MO 4500018892; TAS:14X1109] Notice of Intent To Prepare an Amendment to the 1985 Wells Resource... Act of 1976, as amended, the Bureau of Land Management (BLM) Wells Field Office, Elko, Nevada, is proposing to amend the 1985 Wells Resource Management Plan (RMP) for recreation in the Spruce Mountain Area...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-07
... (EIS) for the General Management Plan (GMP) for Kings Mountain National Military Park (Park), South... Service (NPS) is terminating preparation of an EIS for the GMP for the Park, South Carolina. A Notice of Intent to prepare an EIS for the Park GMP was published in the Federal Register on October 10, 2006 (71...
2007-01-25
the joint staff (J-6) and the intelligence directorate of a joint staff (J-2). The joint restricted frequency list (JRFL) is prepared and promulgated...J-3, and J-6, prepares a joint restricted frequency list (JRFL) for approval by the J-3 (through the information operations [IO] cell or equivalent...SPECTRUM MANAGEMENT PLAN DEGRADATION REPORTS ASSESS FREQUENCY PLAN EFFECTIVENESS UPDATE ASSIGNMENTS UPDATE JOINT RESTRICTED FREQUENCY LIST (JRFL
Hydrologic characteristics of benchmark soils of Hawaii’s forest watersheds-
L. R. Ahuja; S. A. El-Swaify
1975-01-01
The project was initiated in May, 1972. the initial effort involved mapping of forest soils on the islands of Oahu and Kawaii, and collection of relevant literature for preparing the study plan. The detailed study plan (el-Swaify, 1972) was prepared after cooperative discussions with staff of the Institute of Pacific Islands Forestry, Honolulu, Hawaii, and set forth...
ERIC Educational Resources Information Center
Steele, David; Jones, Kevin
This paper describes a workshop prepared and presented by the Business Administration Department of the University of Wisconsin-Eau Claire, that is designed to provide training in evaluating a European market for an American product and preparing a plan for marketing the product in Europe. It is noted that the program can work with both students…
Williams, Janet L; Faucett, W Andrew; Smith-Packard, Bethanny; Wagner, Monisa; Williams, Marc S
2014-08-01
Whole genome sequencing (WGS) is being used for evaluation of individuals with undiagnosed disease of suspected genetic origin. Implementing WGS into clinical practice will place an increased burden upon care teams with regard to pre-test patient education and counseling about results. To quantitate the time needed for appropriate pre-test evaluation of participants in WGS testing, we documented the time spent by our clinical research group on various activities related to program preparation, participant screening, and consent prior to WGS. Participants were children or young adults with autism, intellectual or developmental disability, and/or congenital anomalies, who have remained undiagnosed despite previous evaluation, and their biologic parents. Results showed that significant time was spent in securing allocation of clinical research space to counsel participants and families, and in acquisition and review of participant's medical records. Pre-enrollment chart review identified two individuals with existing diagnoses resulting in savings of $30,000 for the genome sequencing alone, as well as saving hours of personnel time for genome interpretation and communication of WGS results. New WGS programs should plan for costs associated with additional pre-test administrative planning and patient evaluation time that will be required to provide high quality care.
Flight Test Results from the Rake Airflow Gage Experiment on the F-15B Airplane
NASA Technical Reports Server (NTRS)
Frederick, Michael A.; Ratnayake, Nalin A.
2010-01-01
The Rake Airflow Gage Experiment involves a flow-field survey rake that was flown on the Propulsion Flight Test Fixture at the NASA Dryden Flight Research Center using the Dryden F-15B research test bed airplane. The objective of this flight test was to ascertain the flow-field angularity, local Mach number profile, total pressure distortion, and dynamic pressure at the aerodynamic interface plane of the Channeled Centerbody Inlet Experiment. This new mixed-compression, supersonic inlet is planned for flight test in the near term. Knowledge of the flow-field characteristics at this location underneath the airplane is essential to flight test planning and computational modeling of the new inlet, and it is also applicable for future propulsion systems research that may use the Propulsion Flight Test Fixture. This report describes the flight test preparation and execution, and the local flowfield properties calculated from pressure measurements of the rake. Data from the two Rake Airflow Gage Experiment research flights demonstrate that the F-15B airplane, flying at a free-stream Mach number of 1.65 and a pressure altitude of 40,000 ft, would achieve the desired local Mach number for the future inlet flight test. Interface plane distortion levels of 2 percent and a local angle of attack of 2 were observed at this condition. Alternative flight conditions for future testing and an exploration of certain anomalous data also are provided.
Flight Test Results from the Rake Airflow Gage Experiment on the F-15B Airplane
NASA Technical Reports Server (NTRS)
Frederick, Michael A.; Ratnayake, Nalin A.
2011-01-01
The Rake Airflow Gage Experiment involves a flow-field survey rake that was flown on the Propulsion Flight Test Fixture at the NASA Dryden Flight Research Center using the Dryden F-15B research test bed airplane. The objective of this flight test was to ascertain the flow-field angularity, local Mach number profile, total pressure distortion, and dynamic pressure at the aerodynamic interface plane of the Channeled Centerbody Inlet Experiment. This new mixed-compression, supersonic inlet is planned for flight test in the near term. Knowledge of the flow-field characteristics at this location underneath the airplane is essential to flight test planning and computational modeling of the new inlet, an< it is also applicable for future propulsion systems research that may use the Propulsion Flight Test Fixture. This report describes the flight test preparation and execution, and the local flow-field properties calculated from pressure measurements of the rake. Data from the two Rake Airflow Gage Experiment research flights demonstrate that the F-15B airplane, flying at a free-stream Mach number of 1.65 and a pressure altitude of 40,000 ft, would achieve the desired local Mach number for the future inlet flight test. Interface plane distortion levels of 2 percent and a local angle of attack of -2 deg were observed at this condition. Alternative flight conditions for future testing and an exploration of certain anomalous data also are provided.
NASA Astrophysics Data System (ADS)
Ross, Danielle Kristina
Teachers face many challenges as we move forward into the age of the Next Generation Science Standards (NGSS) (Achieve, Inc., 2013). The NGSS aim to develop a population of scientifically literate and talented students who can participate in the "innovation-driven economy" (p. 1). In order to meet these goals, teachers must provide students with opportunities to engage in science and engineering practices (SEPs) and learn core ideas of these disciplines. This study followed pre-service secondary science teachers as they participated in a secondary science teacher preparation program intended to support the development of their pedagogical design capacity (Brown, 2009) related to planning and supporting whole-class taskbased discussions. Teacher educators in this program designed an intervention that aimed in supporting this development. This study examined a particular dimension of PDC -- specifically, PSTs effective use of resources to plan science lessons in which students engage in a high demand task, participate in SEPs, and discuss their work in a whole-class setting. In order to examine the effectiveness of the intervention, I had to define PDC a priori. I measured PDC by documenting how/whether PSTs engaged in the following instructional planning practices: developing Learning Goals, selecting and/or designing challenging tasks, anticipating student thinking, planning for monitoring student thinking, imagining the discussion storyline, planning questions, and planning marking strategies. Analyses showed a significant difference between baseline lesson plan scores and Instructional Performance scores. These findings suggest these patterns and changes were directly linked to the teacher preparation program. The mean increase in Instructional Performance scores during the course of the teacher preparation year further supports the effect of the teacher preparation coursework. Pre-service teachers with high pedagogical design capacity continually integrated the ambitious planning practices they learned in their coursework. In contrast, pre-service teachers with low pedagogical design capacity appeared to appropriate the vocabulary and language they learned in coursework, but did not integrate these practices at a high level. This study suggests that pre-service teachers who receive intensive instruction on ambitious planning practices for task-based discussion effectively develop the pedagogical design capacity to plan for task-based discussion lessons.
NASA Astrophysics Data System (ADS)
Hasyim, Fuad; Subagio, Habib; Darmawan, Mulyanto
2016-06-01
A preparation of spatial planning documents require basic geospatial information and thematic accuracies. Recently these issues become important because spatial planning maps are impartial attachment of the regional act draft on spatial planning (PERDA). The needs of geospatial information in the preparation of spatial planning maps preparation can be divided into two major groups: (i). basic geospatial information (IGD), consist of of Indonesia Topographic maps (RBI), coastal and marine environmental maps (LPI), and geodetic control network and (ii). Thematic Geospatial Information (IGT). Currently, mostly local goverment in Indonesia have not finished their regulation draft on spatial planning due to some constrain including technical aspect. Some constrain in mapping of spatial planning are as follows: the availability of large scale ofbasic geospatial information, the availability of mapping guidelines, and human resources. Ideal conditions to be achieved for spatial planning maps are: (i) the availability of updated geospatial information in accordance with the scale needed for spatial planning maps, (ii) the guideline of mapping for spatial planning to support local government in completion their PERDA, and (iii) capacity building of local goverment human resources to completed spatial planning maps. The OMP strategies formulated to achieve these conditions are: (i) accelerating of IGD at scale of 1:50,000, 1: 25,000 and 1: 5,000, (ii) to accelerate mapping and integration of Thematic Geospatial Information (IGT) through stocktaking availability and mapping guidelines, (iii) the development of mapping guidelines and dissemination of spatial utilization and (iv) training of human resource on mapping technology.
48 CFR 307.104 - General procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false General procedures. 307... ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Planning 307.104 General procedures. (a) Each contracting activity shall prepare an Annual Acquisition Plan (AAP) as far in advance of each fiscal year as...
43 CFR 1610.1 - Resource management planning guidance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... interdisciplinary approach shall be used in the preparation, amendment and revision of resource management plans as... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING... and amendment of resource management plans may be provided by the Director and State Director, as...
Disaster: Planning, Preparation, Prevention.
ERIC Educational Resources Information Center
Rutherford, Christine
1990-01-01
Discusses causes of library disasters and provides several examples of disasters. Emphasis is on the importance of awareness, insurance protection, a written disaster plan, cooperation with the fire marshall and insurance agent in planning, and staff training. Several elements of the written plan are listed. (22 references) (MES)
Lesson Planning the Kodaly Way.
ERIC Educational Resources Information Center
Boshkoff, Ruth
1991-01-01
Discusses the contribution of Zoltan Kodaly to music lesson planning. Emphasizes preparation, presentation, and practice as the three important strategies in teaching concepts and skills to be included in a lesson plan. Includes a sample lesson plan covering a semester and advice on choosing song material. (DK)
40 CFR 51.150 - Classification of regions for episode plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... plans. 51.150 Section 51.150 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Prevention of Air Pollution Emergency Episodes § 51.150 Classification of regions for episode plans. (a) This section...
Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)
NASA Technical Reports Server (NTRS)
Qureshi, Rizwan Hamid; Hughes, Steven P.
2014-01-01
The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.
43 CFR 1610.4-2 - Development of planning criteria.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Development of planning criteria. 1610.4-2... Management Planning § 1610.4-2 Development of planning criteria. (a) The Field Manager will prepare criteria to guide development of the resource management plan or revision, to ensure: (1) It is tailored to...
Effectiveness of a Case-Based System in Lesson Planning
ERIC Educational Resources Information Center
Saad, A.; Chung, P. W. H.; Dawson, C. W.
2014-01-01
Lesson planning imposes a significant burden on teachers as they need to prepare different lesson plans for different classes according to various constraints. SmartLP, a case-based lesson planning system, has been implemented as a means of assisting teachers in constructing quality lesson plans more quickly. SmartLP enables teachers to retrieve…
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Voyage plan. 122.503 Section 122.503 Shipping COAST... Emergencies § 122.503 Voyage plan. (a) The master of the following vessels shall prepare a voyage plan: (1) A... United States Great Lakes port from a Canadian Great Lakes port. (b) The voyage plan required by...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-11
... Granite Creek Watershed Mining Plans AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an... to authorize the approval of mining Plans of Operation in the Granite Creek Watershed Mining Plans... environmental analyses for proposed mining Plans in the portions of the Granite Creek Watershed under their...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-25
... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO--0315-696; 8145-8B90-SZM] Dog... Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan and Environmental Impact Statement (Plan/DEIS). The Plan...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maharrey, Sean P.; Highley, Aaron M.; Behrens, Richard, Jr.
2007-12-01
The objective of this short-term LDRD project was to acquire the tools needed to use our chemical imaging precision mass analyzer (ChIPMA) instrument to analyze tissue samples. This effort was an outgrowth of discussions with oncologists on the need to find the cellular origin of signals in mass spectra of serum samples, which provide biomarkers for ovarian cancer. The ultimate goal would be to collect chemical images of biopsy samples allowing the chemical images of diseased and nondiseased sections of a sample to be compared. The equipment needed to prepare tissue samples have been acquired and built. This equipment includesmore » an cyro-ultramicrotome for preparing thin sections of samples and a coating unit. The coating unit uses an electrospray system to deposit small droplets of a UV-photo absorbing compound on the surface of the tissue samples. Both units are operational. The tissue sample must be coated with the organic compound to enable matrix assisted laser desorption/ionization (MALDI) and matrix enhanced secondary ion mass spectrometry (ME-SIMS) measurements with the ChIPMA instrument Initial plans to test the sample preparation using human tissue samples required development of administrative procedures beyond the scope of this LDRD. Hence, it was decided to make two types of measurements: (1) Testing the spatial resolution of ME-SIMS by preparing a substrate coated with a mixture of an organic matrix and a bio standard and etching a defined pattern in the coating using a liquid metal ion beam, and (2) preparing and imaging C. elegans worms. Difficulties arose in sectioning the C. elegans for analysis and funds and time to overcome these difficulties were not available in this project. The facilities are now available for preparing biological samples for analysis with the ChIPMA instrument. Some further investment of time and resources in sample preparation should make this a useful tool for chemical imaging applications.« less
10 CFR 603.885 - Updated program plans and budgets.
Code of Federal Regulations, 2011 CFR
2011-01-01
... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision requiring the recipient to annually prepare an updated technical plan for future conduct of the research...
ITS strategic deployment plan : executive summary
DOT National Transportation Integrated Search
1997-02-27
The Salt Lake Valley ITS Early Deployment Planning Study-Phase II prepared the framework to deploy candidate Intelligent Transportation System (ITS) projects that address Salt Lake Valleys transportation needs. A planning process was used that inc...
Flagg, Lee A; Sen, Bisakha; Kilgore, Meredith; Locher, Julie L
2014-09-01
To examine the extent to which the gendered division of labour persists within households in the USA in regard to meal planning/preparation and food shopping activities. Secondary analysis of cross-sectional data. 2007-2008 US National Health and Nutrition Examination Survey. Sub-sample of 3195 adults at least 20 years old who had a spouse or partner. Analyses revealed that the majority of women and men reported they shared in both meal planning/preparing and food shopping activities (meal planning/preparation: women 54 % and men 56 %; food shopping: women 60 % and men 57 %). Results from multinomial logistic regression analyses indicated that, compared with men, women were more likely to take primary responsibility than to share this responsibility and less likely to report having no responsibility for these tasks. Gender differences were observed for age/cohort, education and household size. This study may have implications for public health nutritional initiatives and the well-being of families in the USA.