Sample records for presented finally plans

  1. AutoLock: a semiautomated system for radiotherapy treatment plan quality control

    PubMed Central

    Lowe, Matthew; Hardy, Mark J.; Boylan, Christopher J.; Whitehurst, Philip; Rowbottom, Carl G.

    2015-01-01

    A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock. PACS number: 87.55.Qr PMID:26103498

  2. AutoLock: a semiautomated system for radiotherapy treatment plan quality control.

    PubMed

    Dewhurst, Joseph M; Lowe, Matthew; Hardy, Mark J; Boylan, Christopher J; Whitehurst, Philip; Rowbottom, Carl G

    2015-05-08

    A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock.

  3. Seattle To Portland Inter-City ITS Corridor Study And Communications Plan, Final Report

    DOT National Transportation Integrated Search

    1996-03-01

    THIS DOCUMENT IS THE FINAL REPORT PRESENTING THE SEATTLE TO PORTLAND INTELLIGENT TRANSPORTATION SYSTEM (ITS) EARLY DEPLOYMENT PLAN. THE FINAL REPORT SYNTHESIZES INFORMATION FROM TECHNICAL MEMORANDUMS 1 THROUGH 5; INCLUDING EXISTING AND FUTURE CONDITI...

  4. Pretest information for a test to validate plume simulation procedures (FA-17)

    NASA Technical Reports Server (NTRS)

    Hair, L. M.

    1978-01-01

    The results of an effort to plan a final verification wind tunnel test to validate the recommended correlation parameters and application techniques were presented. The test planning effort was complete except for test site finalization and the associated coordination. Two suitable test sites were identified. Desired test conditions were shown. Subsequent sections of this report present the selected model and test site, instrumentation of this model, planned test operations, and some concluding remarks.

  5. Developing and Testing Simulated Occupational Experiences for Distributive Education Students in Rural Communities: Volume III: Training Plans: Final Report.

    ERIC Educational Resources Information Center

    Virginia Polytechnic Inst. and State Univ., Blacksburg.

    Volume 3 of a three volume final report presents prototype job training plans developed as part of a research project which pilot tested a distributive education program for rural schools utilizing a retail store simulation plan. The plans are for 15 entry-level and 15 career-level jobs in seven categories of distributive business (department…

  6. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    DOT National Transportation Integrated Search

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  7. SmartStaff: A Support Concept for Staff Planning

    DTIC Science & Technology

    2000-11-01

    facilitated time management and decreased the ambiguities of the plans presented. However, the quality of the final plan did not improve. Team decision making, Team Planning, Group Support Systems, Task Group Staff

  8. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    DOT National Transportation Integrated Search

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  9. Strategic Planning Study Team. Final Report.

    ERIC Educational Resources Information Center

    Tennessee Univ., Chattanooga.

    This final report presents the results of a University of Tennessee at Chattanooga's (UTC) strategic planning study team, which was charged with documenting computerized services currently available and recommending to the UTC administration areas in which new services should be introduced at the university. A questionnaire was administered to…

  10. Improved Virtual Planning for Bimaxillary Orthognathic Surgery.

    PubMed

    Hatamleh, Muhanad; Turner, Catherine; Bhamrah, Gurprit; Mack, Gavin; Osher, Jonas

    2016-09-01

    Conventional model surgery planning for bimaxillary orthognathic surgery can be laborious, time-consuming and may contain potential errors; hence three-dimensional (3D) virtual orthognathic planning has been proven to be an efficient, reliable, and cost-effective alternative. In this report, the 3D planning is described for a patient presenting with a Class III incisor relationship on a Skeletal III base with pan facial asymmetry complicated by reverse overjet and anterior open bite. A combined scan data of direct cone beam computer tomography and indirect dental scan were used in the planning. Additionally, a new method of establishing optimum intercuspation by scanning dental casts in final occlusion and positioning it to the composite-scans model was shown. Furthermore, conventional model surgery planning was carried out following in-house protocol. Intermediate and final intermaxillary splints were produced following the conventional method and 3D printing. Three-dimensional planning showed great accuracy and treatment outcome and reduced laboratory time in comparison with the conventional method. Establishing the final dental occlusion on casts and integrating it in final 3D planning enabled us to achieve the best possible intercuspation.

  11. Intelligent transportation systems business plan for Kentucky : final report.

    DOT National Transportation Integrated Search

    2001-09-01

    This report presents a Business Plan for Intelligent Transportation Systems (ITS) in Kentucky. The purpose of the Business Plan is to define ITS projects that are planned for implementation from 2002 through 2007. The list of projects contained withi...

  12. Planning for Multiagent Using ASP-Prolog

    NASA Astrophysics Data System (ADS)

    Son, Tran Cao; Pontelli, Enrico; Nguyen, Ngoc-Hieu

    This paper presents an Answer Set Programming based approach to multiagent planning. The proposed methodology extends the action language \\cal B in [12] to represent and reason about plans with cooperative actions of an individual agent operating in a multiagent environment. This language is used to formalize multiagent planning problems and the notion of a joint plan for multiagent in the presence of cooperative actions. Finally, the paper presents a system for computing joint plans based on the ASP-Prolog system.

  13. Pathways to Practice. A Series of Final Reports on the SREB Nursing Curriculum Project.

    ERIC Educational Resources Information Center

    Haase, Patricia T.

    Five final reports on the Nursing Curriculum Project of the Southern Regional Education Board are presented. The reports include (1) RN (Registered Nursing) Education: The Basic Issues; (2) Types of RN Programs; (3) Planning and Operating an RN Program; (4) Acclimating the Novice Nurse: Whose Responsibility? and (5) Statewide Planning for Nursing.…

  14. Miami Valley ITS : early deployment plan : final ITS strategic deployment plan

    DOT National Transportation Integrated Search

    1997-09-01

    This report presents the Strategic Deployment Plan for Intelligent Transportation Systems (ITS) in Clark, Greene, Miami and Montgomery Counties, Ohio (the Miami Valley). The report summarizes the steps that were performed in preparing the Strat...

  15. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 4: Solar electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the solar electric propulsion (SEP) concept design developed as part of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the SEP concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  16. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 2: Cryo/aerobrake vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The cryogenic/aerobrake (CAB) and the cryogenic all-propulsive (CAP) concept designs developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study are presented. The evolution of the CAB and CAP concepts is described along with the requirements, guidelines and assumptions for the designs. Operating modes and options are defined and systems descriptions of the vehicles are presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  17. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 5: Nuclear electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The nuclear electric propulsion (NEP) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study is presented. The evolution of the NEP concept is described along with the requirements, guidelines, and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  18. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 3: Nuclear thermal rocket vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the nuclear thermal rocket (NTR) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the NTR concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  19. Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment

    DOT National Transportation Integrated Search

    2003-09-22

    This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...

  20. Plan for the Class of 2000. Final Report of the Program Planning Committee.

    ERIC Educational Resources Information Center

    Wake Forest Univ., Winston Salem, NC.

    This report presents the comprehensive academic plan for undergraduate students to be phased in at Wake Forest University (North Carolina) beginning with the class entering in 1996. Four concepts are emphasized in the plan: (1) continued personalization and individualization of the professor-student relationship; (2) establishment of a first-year…

  1. Space Solar Power Program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arif, Humayun; Barbosa, Hugo; Bardet, Christophe

    1992-08-01

    Information pertaining to the Space Solar Power Program is presented on energy analysis; markets; overall development plan; organizational plan; environmental and safety issues; power systems; space transportation; space manufacturing, construction, operations; design examples; and finance.

  2. Expert systems in transmission planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Galiana, F.D.; McGillis, D.T.; Marin, M.A.

    1992-05-01

    In this paper the state of the field of expert systems and knowledge engineering in transmission planning is reviewed. A detailed analysis of the goals, definition, requirements and methodology of transmission planning is presented. Potential benefits of knowledge-based applications in transmission planning are reviewed. This is followed by a thorough review of the area broken down into subareas or important related topics. The conclusions offer a number of suggestions for possible future research and development. Finally, a detailed bibliography divided into subareas is presented.

  3. Mathematic model of regional economy development by the final result of labor resources

    NASA Astrophysics Data System (ADS)

    Zaitseva, Irina; Malafeev, Oleg; Strekopytov, Sergei; Bondarenko, Galina; Lovyannikov, Denis

    2018-04-01

    This article presents the mathematic model of regional economy development based on the result of labor resources. The solution of a region development-planning problem is considered for the period of long-lasting planning taking into account the beginning and the end of the planned period. The challenge is to find the distribution of investments in the main and additional branches of the regional economy, which will provide simultaneous transaction of all major sectors of the regional economy from the given condition to the predetermined final state.

  4. Formacion de Formadores en Planeamiento y Administracion de la Education: Informe Final. Reunion Tecnica de la Red REPLAD, Campinas, Sao Paulo, Brasil, 9-13 de noviembre de 1987. (Educational Development of Professionals in Educational Planning and Administration: Final Report. Proceedings of the Meeting of the Major Project for Education (Sao Paulo, Brazil, November 9-13, 1987).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Santiago (Chile). Regional Office for Education in Latin America and the Caribbean.

    This final report provides a synthesis of conference presentations by representatives from institutions in 17 Latin American and the Caribbean nations. The material includes descriptions about institutions of higher education planning and developing of their respective schools of education, ministries of education, and national and regional…

  5. Swimming Pools. A Guide to Their Planning, Design and Operation.

    ERIC Educational Resources Information Center

    Gabrielsen, M. Alexander, Ed.

    Information is presented regarding all phases of swimming pool development and operation from earliest planning considerations to final programing. This comprehensive book covers--(1) the steps involved in planning a pool, (2) designing the pool, (3) water circulation, filtration, and treatment, (4) community pools, school and agency pools, and…

  6. Sacramento Transportation Authority 1996-97 Final Budget

    DOT National Transportation Integrated Search

    1996-07-16

    The Governing Board of the Sacramento Transportation Authority (STA) and the : Sacramento Abandoned Vehicle Service Authority (SAVSA) present the 1996-97 Final Budget for these two entities. This document represents the operational plan for administe...

  7. Cultural Resources Management Plan: Coralville Lake, Iowa.

    DTIC Science & Technology

    1987-05-01

    7 iAlf now* E-* ILA’AUKEE -.WlSCCqSIN -. THE ARCHAEOLOGY OF CORALVILLE LAKE, IOWA - FINAL CULTURAL RESOURCES MANAGEMENT PLAN Prepared By...2004 In Fulfillment of: Contract No. DACW25-86-C-0036 May 1987 (A -P. 7V. V T This report entitled, "The Archaeology of Coralville Lake, Iowa - Final...various studies include survey, testing, and geomorphic investigations. "The Archaeology of Coralville Lake, Iowa - Landscape Evolution" presents the

  8. Developing a Career Planning Center. Occupational Education Research Project Final Report.

    ERIC Educational Resources Information Center

    Kidd, Frank E.; Embry, Judy K.

    Designed as a guide for those community college institutions developing a career planning center, this handbook presents a model for planning and implementing such a center. Options for centers are suggested for three levels of development and staffing: self-directed, intermediate, and comprehensive. Chapter 1 outlines the rationale and possible…

  9. Coosa River Storage Annex, Talladega, Alabama Environmental Investigation, Final Management and Resources Utilization Plan

    DTIC Science & Technology

    1991-02-01

    to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as

  10. Final Report Program Plan for Search and Rescue Electronics Alerting and Locating System

    DOT National Transportation Integrated Search

    1974-02-01

    This study investigates the requirements that exist for electronic devices for alerting and locating distress incidents and presents a plan for acquiring an adequate capability. Data are provided that bound the problem. Possible alternatives are exam...

  11. Automatic Abstraction in Planning

    NASA Technical Reports Server (NTRS)

    Christensen, J.

    1991-01-01

    Traditionally, abstraction in planning has been accomplished by either state abstraction or operator abstraction, neither of which has been fully automatic. We present a new method, predicate relaxation, for automatically performing state abstraction. PABLO, a nonlinear hierarchical planner, implements predicate relaxation. Theoretical, as well as empirical results are presented which demonstrate the potential advantages of using predicate relaxation in planning. We also present a new definition of hierarchical operators that allows us to guarantee a limited form of completeness. This new definition is shown to be, in some ways, more flexible than previous definitions of hierarchical operators. Finally, a Classical Truth Criterion is presented that is proven to be sound and complete for a planning formalism that is general enough to include most classical planning formalisms that are based on the STRIPS assumption.

  12. The Missions and Strategic Planning of Arizona's Universities.

    ERIC Educational Resources Information Center

    MacVicar, Robert

    As a part of the final report of the Arizona Board of Regents' Task Force on Excellence, Efficiency and Competitiveness, the history of statewide planning for postsecondary education in Arizona is presented. In 1974, the Board of Regents adopted a long-range planning document with statements of what it would not do to limit university aspirations…

  13. Models and Procedures for Improving the Planning, Management, and Evaluation of Cooperative Education Programs. Final Report. Volume I.

    ERIC Educational Resources Information Center

    Blaschke, Charles L.; Steiger, JoAnn

    This report of a project to design a set of training guidelines for planning, managing, and evaluating cooperative education programs describes briefly the procedures used in developing the guidelines and model; discusses the various components of the planning, management, and evaluation process; and presents guidelines and criteria for designing…

  14. X-43A Final Flight Observations

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie

    2011-01-01

    The presentation will provide an overview of the final flight of the NASA X-43A project. The project consisted of three flights, two planned for Mach 7 and one for Mach 10. The first flight, conducted on June 2, 2001, was unsuccessful and resulted in a nine-month mishap investigation. A two-year return to flight effort ensued and concluded when the second Mach 7 flight was successfully conducted on March 27, 2004. The third and final flight, which occurred on November 16, 2004, was the first Mach 10 flight demonstration of an airframe-integrated, scramjet-powered, hypersonic vehicle. As such, the final flight presented first time technical challenges in addition to final flight project closeout concerns. The goals and objectives for the third flight as well as those for the project will be presented. The configuration of the Hyper-X stack including the X-43A, Hyper-X launch vehicle, and Hyper-X research vehicle adapter wil also be presented. Mission differences, vehicle modifications and lessons learned from the first and second flights as they applied to the third flight will also be discussed. Although X-43A flight 3 was always planned to be the final flight of the X-43A project, the X-43 program had two other vehicles and corresponding flight phases in X-43C and X-43B. Those other projects never manifested under the X-43 banner and X-43A flight 3 also became the final flight of X-43 program.

  15. International Workshop on Communications in Family Planning Programs (Teheran, June 6-18, 1970). Final Report.

    ERIC Educational Resources Information Center

    Blake, Robert R., Ed.; Wolfe, Suzanne, R., Ed.

    This report presents some of the proceedings of a workshop on communications in family planning programs held in Teheran, Iran. A total of 82 participants from 15 Mid-Eastern and African countries attended. The purpose of the workshop was to assist each country to prepare a work plan for information and education activities related to population…

  16. Course and Class Planning

    ERIC Educational Resources Information Center

    Goodman, Sylvia J.

    1976-01-01

    The author details the various stages and considerations in planning either a full course or an individual class. Having decided upon objectives, teachers should sift through course material for relevant topics, and through teaching methods for those most appropriate. Influences bearing on the course's final presentation should be anticipated.…

  17. An assessment of a traffic monitoring system for a major traffic generator to improve regional planning : final presentation.

    DOT National Transportation Integrated Search

    2008-08-01

    Report Abstract: : The purpose of this guide is to aid the Texas Department of Transportation (TxDOT), Metropolitan Planning Organizations (MPO), and other state and local agencies to develop an effective traffic monitoring system for new major traff...

  18. Strategic Planning: The Commission on School's Final Report.

    ERIC Educational Resources Information Center

    Gose, Kenneth F.

    1995-01-01

    Presents findings from activities undertaken by the North Central Association to determine strategic planning needs for 1995-2000, including a survey of 213 member schools and an environmental scan. Indicates that 91% of the members expressed the importance of keeping schools informed about standards. Lists eight critical elements discovered in…

  19. Final definition and preliminary design study for the initial atmospheric cloud physics laboratory, a Spacelab mission payload

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.

  20. [Planning driven by health priorities. Master planning criteria].

    PubMed

    Tresserras, Ricard

    2008-12-01

    With the aim of responding to a number of problems detected in health plan evaluations, a new direction has been proposed in Catalonia which would lead to the improved unification of the strategic and operational approaches, and leadership. The master plans that tackle those health problems with the greatest impact were created along these lines. This article presents the most salient aspects of the master plans for oncology, circulatory diseases, mental health and addictions, immigration and the field of social healthcare. Their organisational structure, mission and functions are presented, commenting on the prioritisation of activities and the principal benchmark elements of the healthcare model in the definition of planning criteria for services incorporated into the Health Map. Finally, mention is made of the evaluation procedures. The in-depth study of priority settings has resulted in significant progress towards unifying health and service planning.

  1. VTAE Equity Staff Development Workshops and Services--Phase II. Final Report.

    ERIC Educational Resources Information Center

    Baldus, Lorayne; Nelson, Orville

    The Phase II Equity Staff Development project was revised in response to a need to develop an equity strategic planning model with a vision statement, goals, and objectives. The Equity Strategic Planning Model was presented to administrators of Wisconsin Vocational, Technical, and Adult Education (VTAE) colleges for their use in district strategic…

  2. Natural Channel Design Review Checklist

    EPA Pesticide Factsheets

    This document presents a brief description of the checklist items by the following sections: Watershed and Geomorphic Assessment, Preliminary Design, Final Design, and Maintenance and Monitoring Plans.

  3. Combination of an electrolytic pretreatment unit with secondary water reclamation processes

    NASA Technical Reports Server (NTRS)

    Wells, G. W.; Bonura, M. S.

    1973-01-01

    The design and fabrication of a flight concept prototype electrolytic pretreatment unit (EPU) and of a contractor-furnished air evaporation unit (AEU) are described. The integrated EPU and AEU potable water recovery system is referred to as the Electrovap and is capable of processing the urine and flush water of a six-man crew. Results of a five-day performance verification test of the Electrovap system are presented and plans are included for the extended testing of the Electrovap to produce data applicable to the combination of electrolytic pretreatment with most final potable water recovery systems. Plans are also presented for a program to define the design requirements for combining the electrolytic pretreatment unit with a reverse osmosis final processing unit.

  4. Tools for Supporting Distributed Agile Project Planning

    NASA Astrophysics Data System (ADS)

    Wang, Xin; Maurer, Frank; Morgan, Robert; Oliveira, Josyleuda

    Agile project planning plays an important part in agile software development. In distributed settings, project planning is severely impacted by the lack of face-to-face communication and the inability to share paper index cards amongst all meeting participants. To address these issues, several distributed agile planning tools were developed. The tools vary in features, functions and running platforms. In this chapter, we first summarize the requirements for distributed agile planning. Then we give an overview on existing agile planning tools. We also evaluate existing tools based on tool requirements. Finally, we present some practical advices for both designers and users of distributed agile planning tools.

  5. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...

  6. Model-Unified Planning and Execution for Distributed Autonomous System Control

    NASA Technical Reports Server (NTRS)

    Aschwanden, Pascal; Baskaran, Vijay; Bernardini, Sara; Fry, Chuck; Moreno, Maria; Muscettola, Nicola; Plaunt, Chris; Rijsman, David; Tompkins, Paul

    2006-01-01

    The Intelligent Distributed Execution Architecture (IDEA) is a real-time architecture that exploits artificial intelligence planning as the core reasoning engine for interacting autonomous agents. Rather than enforcing separate deliberation and execution layers, IDEA unifies them under a single planning technology. Deliberative and reactive planners reason about and act according to a single representation of the past, present and future domain state. The domain state behaves the rules dictated by a declarative model of the subsystem to be controlled, internal processes of the IDEA controller, and interactions with other agents. We present IDEA concepts - modeling, the IDEA core architecture, the unification of deliberation and reaction under planning - and illustrate its use in a simple example. Finally, we present several real-world applications of IDEA, and compare IDEA to other high-level control approaches.

  7. Skirting Saturn's Rings and Skimming Its Cloud Tops: Planning Cassini's End of Mission

    NASA Technical Reports Server (NTRS)

    Manor-Chapman, Emily; Magee, Kari; Brooks, Shawn; Edgington, Scott; Heventhal, William; Sturm, Erick

    2014-01-01

    In October 2010, the Cassini spacecraft embarked on the seven-year Solstice Mission. The mission will culminate with a spectacular series of orbits that bring Cassini between Saturn's innermost ring, the D ring, and the cloud tops of the planet. The spacecraft will make its closest passages ever to the planet allowing for unprecedented science to be collected on Saturn and its rings. These final orbits will expose the spacecraft to new environments, which presents a number of challenges to planning the final mission phase. While these challenges will require adaptations to planning processes and operations, they are not insurmountable. This paper describes the challenges identified and the steps taken to mitigate them to enable collection of unique Saturn system science.

  8. NOAA Office of Exploration and Research > Data Access > Publications

    Science.gov Websites

    2014 Funding Opportunities Contact Us Program Review Review Panel Final Report Review Team Documents Affiliate Locations Strategic Plan 2014 Funding Opportunities Contact Us Program Review Review Panel Final Report Review Team Documents Presentations Supporting Documents Guiding Documents Exploration Overview

  9. What is the Final Verification of Engineering Requirements?

    NASA Technical Reports Server (NTRS)

    Poole, Eric

    2010-01-01

    This slide presentation reviews the process of development through the final verification of engineering requirements. The definition of the requirements is driven by basic needs, and should be reviewed by both the supplier and the customer. All involved need to agree upon a formal requirements including changes to the original requirements document. After the requirements have ben developed, the engineering team begins to design the system. The final design is reviewed by other organizations. The final operational system must satisfy the original requirements, though many verifications should be performed during the process. The verification methods that are used are test, inspection, analysis and demonstration. The plan for verification should be created once the system requirements are documented. The plan should include assurances that every requirement is formally verified, that the methods and the responsible organizations are specified, and that the plan is reviewed by all parties. The options of having the engineering team involved in all phases of the development as opposed to having some other organization continue the process once the design has been complete is discussed.

  10. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment

    PubMed Central

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S.; Phoon, Sin Ye

    2016-01-01

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively. PMID:27271840

  11. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment.

    PubMed

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S; Phoon, Sin Ye

    2016-06-07

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively.

  12. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment

    NASA Astrophysics Data System (ADS)

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S.; Phoon, Sin Ye

    2016-06-01

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively.

  13. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  14. Superfund Record of Decision (EPA Region 4): Milan Army Ammunition Plant, Milan, TN, March 11, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-09-01

    This decision document presents the selected action for the Salvage Yard, Former Ammunition Burnout Area (ABA), and Sanitary Landfill at MLAAP, located in Gibson and Carroll Counties, TN. This ROD addresses the final response action planned for the Salvage Yard, Former ABA, and Sanitary Landfill, including soil and groundwater. NFA is the selected remedy for soil and groundwater at the Salvage Yard, Former ABA, and Sanitary landfill. The selected remedy manages the risk to acceptable levels for both human health and the environment and is the final action planned.

  15. The New Jersey Department of Higher Education's Health Manpower Planning Contract. Final Comprehensive Report.

    ERIC Educational Resources Information Center

    Tomson, Jon; Vasilenko, Patricia

    This report of the New Jersey Department of Higher Education's Health Manpower Planning Contract describes project activities and assessment methods and models, presents data on employment supply and demand, and provides samples of questionnaires and forms that were used. The department was required under contract to: survey and evaluate pertinent…

  16. Plan Multinacional de Educacion del Adulto (Multinational Plan for Adult Education).

    ERIC Educational Resources Information Center

    Eduplan Informa, 1971

    1971-01-01

    This document contains part of the final report from the first meeting of the Inter-American Council on Education, Science, and Culture, held in Vina del Mar, Chile, in 1970. The report presents general policy and guidelines which should be followed in the establishment of adult elementary education programs. The general discussion covers literacy…

  17. 78 FR 76176 - Notice of Availability of the Record of Decision for the Final Trail Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ...] Notice of Availability of the Record of Decision for the Final Trail Management Plan/Environmental Impact... (ROD) for the Final Trail Management Plan/ Environmental Impact Statement (Plan/EIS), Cuyahoga Valley... 1, the no-action alternative, the trails, authorized uses, and facilities addressed in this Plan/EIS...

  18. GIS-based planning system for managing the flow of construction and demolition waste in Brazil.

    PubMed

    Paz, Diogo Henrique Fernandes da; Lafayette, Kalinny Patrícia Vaz; Sobral, Maria do Carmo

    2018-05-01

    The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.

  19. Human Space Flight Plans Committee

    NASA Image and Video Library

    2009-08-11

    Norman Augustine, chair, listens to a speaker's presentation during the final meeting of the Human Space Flight Review Committee, Wednesday, Aug. 12, 2009, in Washington. Photo Credit: (NASA/Paul E. Alers)

  20. Automated planning for intelligent machines in energy-related applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weisbin, C.R.; de Saussure, G.; Barhen, J.

    1984-01-01

    This paper discusses the current activities of the Center for Engineering Systems Advanced Research (CESAR) program related to plan generation and execution by an intelligent machine. The system architecture for the CESAR mobile robot (named HERMIES-1) is described. The minimal cut-set approach is developed to reduce the tree search time of conventional backward chaining planning techniques. Finally, a real-time concept of an Intelligent Machine Operating System is presented in which planning and reasoning is embedded in a system for resource allocation and process management.

  1. Optimal rail container shipment planning problem in multimodal transportation

    NASA Astrophysics Data System (ADS)

    Cao, Chengxuan; Gao, Ziyou; Li, Keping

    2012-09-01

    The optimal rail container shipment planning problem in multimodal transportation is studied in this article. The characteristics of the multi-period planning problem is presented and the problem is formulated as a large-scale 0-1 integer programming model, which maximizes the total profit generated by all freight bookings accepted in a multi-period planning horizon subject to the limited capacities. Two heuristic algorithms are proposed to obtain an approximate optimal solution of the problem. Finally, numerical experiments are conducted to demonstrate the proposed formulation and heuristic algorithms.

  2. Therapy Dogs on Campus: A Counseling Outreach Activity for College Students Preparing for Final Exams

    ERIC Educational Resources Information Center

    Barker, Sandra B.; Barker, Randolph T.; Schubert, Christine M.

    2017-01-01

    A university counseling center engaged a therapy dog program for an outreach activity to reduce stress as students prepare for final exams at a large culturally diverse university. This article describes the rationale, planning, and implementation of the activity; presents an evaluation summary; and provides recommendations and implications for…

  3. Installation Restoration Program Stage 3. McClellan Air Force Base Quality Assurance Project Plan

    DTIC Science & Technology

    1989-08-30

    QUALITY ASSURANCE PROJECT PLAN TDTM FINAL ELECTE C\\ JAUG 3 119891 .. .. . .. 0.. ... PREPARD.FOR HEDURTR FL/E WRGTPATRO .. F... OHI.443 ........ 1N...P.E. Contract Program Manager \\ 0 RADMAN 0 TABLE OF CONTENTS Section Page 1.0 INTRODUCTION ................................................... 1 of 6...Section: 1.0 RADM Revision: 1 CO PO AIO NDate: 04/12/89 O Page 1 of 6 1.0 INTRODUCTION The Quality Assurance Project Plan (QAPP) presents in specific

  4. Mod-5A wind turbine generator program design report. Volume 3: Final design and system description, book 2

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The design, development and analysis of the 7.3MW MOD-5A wind turbine generator is documented. The report is divided into four volumes: Volume 1 summarizes the entire MOD-5A program, Volume 2 discusses the conceptual and preliminary design phases, Volume 3 describes the final design of the MOD-5A, and Volume 4 contains the drawings and specifications developed for the final design. Volume 3, book 2 describes the performance and characteristics of the MOD-5A wind turbine generator in its final configuration. The subsystem for power generation, control, and instrumentation subsystems is described in detail. The manufacturing and construction plans, and the preparation of a potential site on Oahu, Hawaii, are documented. The quality assurance and safety plan, and analyses of failure modes and effects, and reliability, availability and maintainability are presented.

  5. A survey of experiments and experimental facilities for active control of flexible structures

    NASA Technical Reports Server (NTRS)

    Sparks, Dean W., Jr.; Horner, Garnett C.; Juang, Jer-Nan; Klose, Gerhard

    1989-01-01

    A brief survey of large space structure control related experiments and facilities was presented. This survey covered experiments performed before and up to 1982, and those of the present period (1982-...). Finally, the future planned experiments and facilities in support of the control-structure interaction (CSI) program were reported. It was stated that new, improved ground test facilities are needed to verify the new CSI design techniques that will allow future space structures to perform planned NASA missions.

  6. Building the IOOS data management subsystem

    USGS Publications Warehouse

    de La Beaujardière, J.; Mendelssohn, R.; Ortiz, C.; Signell, R.

    2010-01-01

    We discuss progress to date and plans for the Integrated Ocean Observing System (IOOS??) Data Management and Communications (DMAC) subsystem. We begin by presenting a conceptual architecture of IOOS DMAC. We describe work done as part of a 3-year pilot project known as the Data Integration Framework and the subsequent assessment of lessons learned. We present work that has been accomplished as part of the initial version of the IOOS Data Catalog. Finally, we discuss near-term plans for augmenting IOOS DMAC capabilities.

  7. Development of a Plan for Research, Development and Instruction in Adult Vocational Education. Final Report.

    ERIC Educational Resources Information Center

    Illinois Univ., Urbana. Dept. of Vocational and Technical Education.

    This report of a project to begin to develop a plan for research, development, and instruction in adult vocational education in Illinois has two specific goals: (1) to identify the current status of adult vocational education in Illinois and (2) to recommend key directions for state actions. It presents information collected through a…

  8. The 30/20 GHz flight experiment system, phase 2. Volume 2: Experiment system description

    NASA Technical Reports Server (NTRS)

    Bronstein, L.; Kawamoto, Y.; Ribarich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.

    1981-01-01

    A detailed technical description of the 30/20 GHz flight experiment system is presented. The overall communication system is described with performance analyses, communication operations, and experiment plans. Hardware descriptions of the payload are given with the tradeoff studies that led to the final design. The spacecraft bus which carries the payload is discussed and its interface with the launch vehicle system is described. Finally, the hardwares and the operations of the terrestrial segment are presented.

  9. 77 FR 12877 - Record of Decision for the General Management Plan/Abbreviated Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Decision for the General Management Plan/Abbreviated Final Environmental Impact Statement for New River... Abbreviated Final Environmental Impact Statement for the General Management Plan for New River Gorge National... Record of Decision can be downloaded from the NPS Planning, Environment and Public Comment (PEPC) Web...

  10. Phase IV of Early Restoration | NOAA Gulf Spill Restoration

    Science.gov Websites

    Trustees published the Final Phase IV Early Restoration Plan and Environmental Assessments. The plan habitats. Useful Links: Final Phase IV Early Restoration Plan and Environmental Assessments (pdf, 4.8 MB ) Final Phase IV Early Restoration Plan and Environmental Assessments Executive Summary (pdf, 729 KB

  11. Tax treatment of cafeteria plans. Internal Revenue Service (IRS), Treasury. Final regulations.

    PubMed

    2000-03-23

    This document contains final regulations relating to section 125 cafeteria plans. The final regulations clarify the circumstances under which a section 125 cafeteria plan election may be changed. The final regulations permit an employer to allow a section 125 cafeteria plan participant to revoke an existing election and make a new election during a period of coverage for accident or health coverage or group-term life insurance coverage.

  12. 76 FR 42727 - Notice of Availability of a Record of Decision on the Final Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... of Decision for the Final Environmental Impact Statement for the General Management Plan (FEIS/GMP... Alternative contained in the FEIS/GMP issued on September 19, 2008. The following course of action will occur... events. This alternative has been modified from the Alternative B presented in the FEIS/GMP as discussed...

  13. Alternative sample sizes for verification dose experiments and dose audits

    NASA Astrophysics Data System (ADS)

    Taylor, W. A.; Hansen, J. M.

    1999-01-01

    ISO 11137 (1995), "Sterilization of Health Care Products—Requirements for Validation and Routine Control—Radiation Sterilization", provides sampling plans for performing initial verification dose experiments and quarterly dose audits. Alternative sampling plans are presented which provide equivalent protection. These sampling plans can significantly reduce the cost of testing. These alternative sampling plans have been included in a draft ISO Technical Report (type 2). This paper examines the rational behind the proposed alternative sampling plans. The protection provided by the current verification and audit sampling plans is first examined. Then methods for identifying equivalent plans are highlighted. Finally, methods for comparing the cost associated with the different plans are provided. This paper includes additional guidance for selecting between the original and alternative sampling plans not included in the technical report.

  14. 75 FR 57059 - Montana Department of Natural Resources and Conservation Final Habitat Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N175; 61130-1115-0000 F2] Montana Department of Natural Resources and Conservation Final Habitat Conservation Plan and Final... Department of Natural Resources and Conservation (DNRC) a Final Habitat Conservation Plan (HCP) and prepared...

  15. The evolutionary origin of the vertebrate body plan: the problem of head segmentation.

    PubMed

    Onai, Takayuki; Irie, Naoki; Kuratani, Shigeru

    2014-01-01

    The basic body plan of vertebrates, as typified by the complex head structure, evolved from the last common ancestor approximately 530 Mya. In this review, we present a brief overview of historical discussions to disentangle the various concepts and arguments regarding the evolutionary development of the vertebrate body plan. We then explain the historical transition of the arguments about the vertebrate body plan from merely epistemological comparative morphology to comparative embryology as a scientific treatment on this topic. Finally, we review the current progress of molecular evidence regarding the basic vertebrate body plan, focusing on the link between the basic vertebrate body plan and the evolutionarily conserved developmental stages (phylotypic stages).

  16. White Sturgeon Bibliography, 1985 Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fickeisen, Duane H.

    1986-03-01

    This bibliography presents citations to the majority of published materials on white sturgeon (Acipenser transmontanus). The purpose was to assist in planning and implementing research on white sturgeon in the Columbia River system. (ACR)

  17. A Markovian model for assessment of personnel hiring plans

    NASA Technical Reports Server (NTRS)

    Katz, L. G.

    1974-01-01

    As a result of the current economic environment, many organizations are having to operate with fewer resources. In the manpower area, these constraints have forced organizations to operate within well-defined hiring plans. Exceeding personnel ceilings is in most cases an intolerable situation. A mathematical model, based on the theory of Markov processes, is presented which can be used to assess the chances of success of personnel hiring plans. The model considers a plan to be successful if the final population size, at the end of the planning period, lies within a range specified by management. Although this model was developed to assess personnel hiring plans at the Goddard Space Flight Center, it is directly applicable wherever personnel hiring plans are used.

  18. Final consolidated action plan to Tiger Team. Volume 1, Change 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A thirdmore » purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less

  19. Final consolidated action plan to Tiger Team. Volume 2, Change 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficienciesmore » identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less

  20. WORKSHOP ON ORGANIZATION AND OPERATION OF COOPERATIVE WORK EXPERIENCE PROGRAMS IN TRADE AND INDUSTRIAL EDUCATION. (TUSKEGEE INSTITUTE, AUGUST 14-SEPTEMBER 1, 1967). FINAL REPORT.

    ERIC Educational Resources Information Center

    HARRIS, JAMES N.; SHERARD, AUSTELL O.

    THIRTY-NINE TRADE AND INDUSTRIAL AND VOCATIONAL TECHNICAL TEACHERS AND SUPERVISORS FROM 19 STATES PARTICIPATED IN A WORKSHOP TO PLAN AND EXECUTE A COMPREHENSIVE EXAMINATION AND EVALUATION OF THE COOPERATIVE WORK EXPERIENCE PLAN OF EDUCATION RELATIVE TO TRADE AND INDUSTRIAL EDUCATION. THE WORKSHOP ORGANIZATION INCLUDED CONSULTANT PRESENTATIONS,…

  1. The Impact of Court-Ordered Desegregation on Student Enrollment and Residential Patterns in the Jefferson County Kentucky Public School District, Final Report.

    ERIC Educational Resources Information Center

    Cunningham, George K.; Husk, William L.

    After reviewing the literature on school desegregation and the background of the comprehensive metropolitan school desegregation plan implemented in Louisville and Jefferson County in 1975, this report analyzes school enrollment and residential changes in the years after the plan was implemented. Data are presented for public and non-public school…

  2. National Research Conference on Day Programs for Hearing Impaired Children (Lake Mohonk, New York, May 10-13, 1967). Final Report.

    ERIC Educational Resources Information Center

    Mulholland, Ann M.; Fellendorf, George W.

    State needs in public school education for the hearing impaired and steps in the development of comprehensive state planning are presented along with recommendations of conference participants, a summary report, and models for regional planning, day programs, and the team approach. The interest of the Alexander Graham Bell Association and the U.S.…

  3. Planning for the Eighties: A Nontraditional Self-Study for the Southern Association of Colleges and Schools. Volume III: Stage Thirteen.

    ERIC Educational Resources Information Center

    Appalachian State Univ., Boone, NC.

    A report on the final phase of a self-study and planning process undertaken by Appalachian State University, North Carolina, is presented. Initiated in 1979, the effort has involved: an examination of the university's internal and external environment, the potential impact of projected societal trends and value shifts, formulation of objectives to…

  4. The Use of Probability Theory as a Basis for Planning and Controlling Overhead Costs in Education and Industry. Final Report.

    ERIC Educational Resources Information Center

    Vinson, R. B.

    In this report, the author suggests changes in the treatment of overhead costs by hypothesizing that "the effectiveness of standard costing in planning and controlling overhead costs can be increased through the use of probability theory and associated statistical techniques." To test the hypothesis, the author (1) presents an overview of the…

  5. Preliminary Specifications (Hardware and Software) for a Center for Information Services. Final Report on Mechanized Information Services in the University Library, Phase I - Planning. Part 10.

    ERIC Educational Resources Information Center

    California Univ., Los Angeles. Inst. of Library Research.

    The general conclusions of the planning study on Mechanized Information Services in the University Library are that such services represent a desirable, even necessary, extension of the library's traditional functions. Preliminary specifications for such a library-based "Center for Information Services" (CIS) are presented in this report. Covered…

  6. Preliminary design polymeric materials experiment. [for space shuttles and Spacelab missions

    NASA Technical Reports Server (NTRS)

    Mattingly, S. G.; Rude, E. T.; Marshner, R. L.

    1975-01-01

    A typical Advanced Technology Laboratory mission flight plan was developed and used as a guideline for the identification of a number of experiment considerations. The experiment logistics beginning with sample preparation and ending with sample analysis are then overlaid on the mission in order to have a complete picture of the design requirements. The results of this preliminary design study fall into two categories. First specific preliminary designs of experiment hardware which is adaptable to a variety of mission requirements. Second, identification of those mission considerations which affect hardware design and will require further definition prior to final design. Finally, a program plan is presented which will provide the necessary experiment hardware in a realistic time period to match the planned shuttle flights. A bibliography of all material reviewed and consulted but not specifically referenced is provided.

  7. Modeling, system identification, and control of ASTREX

    NASA Technical Reports Server (NTRS)

    Abhyankar, Nandu S.; Ramakrishnan, J.; Byun, K. W.; Das, A.; Cossey, Derek F.; Berg, J.

    1993-01-01

    The modeling, system identification and controller design aspects of the ASTREX precision space structure are presented in this work. Modeling of ASTREX is performed using NASTRAN, TREETOPS and I-DEAS. The models generated range from simple linear time-invariant models to nonlinear models used for large angle simulations. Identification in both the time and frequency domains are presented. The experimental set up and the results from the identification experiments are included. Finally, controller design for ASTREX is presented. Simulation results using this optimal controller demonstrate the controller performance. Finally the future directions and plans for the facility are addressed.

  8. Assisting Newcomers through Employment and Support Services: An Evaluation of the New Americans Centers Demonstration Project in Arkansas and Iowa. Final Report

    ERIC Educational Resources Information Center

    Koralek, Robin; Johnson, Heidi; Ratcliffe, Caroline; Vericker, Tracy

    2010-01-01

    This report presents the final results for the evaluation of the New Americans Centers (NACs) demonstration project in Arkansas and Iowa. It focuses on program operations and plans for program sustainability, while highlighting services provided through the demonstration projects in Arkansas and Iowa. It also documents outcomes for New Iowan…

  9. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  10. 78 FR 17835 - Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).

  11. Share the road campaign research study : final report

    DOT National Transportation Integrated Search

    2012-07-01

    This report presents the Environmental Data Test Plan for the national evaluation of the Los Angeles (LA) Congestion Reduction Demonstration (Metro ExpressLanes) under the United States Department of Transportation (U.S. DOT) Congestion Reduction Dem...

  12. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Monocacy National Battlefield

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... DEPARTMENT OF THE INTERIOR National Park Service Final Environmental Impact Statement for the... Interior. ACTION: Notice of Availability of the Final Environmental Impact Statement for the General... Environmental Impact Statement for the General Management Plan for Monocacy National Battlefield. The plan will...

  13. 75 FR 36551 - State Highway-Rail Grade Crossing Action Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ...-0032; Notice No. 5] RIN 2130-AC20 State Highway-Rail Grade Crossing Action Plans AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Final rule. SUMMARY: This final... three years, to develop State highway-rail grade crossing action plans. The final rule addresses the...

  14. Challenges of Moving IPG into Production

    NASA Technical Reports Server (NTRS)

    Schulbach, Cathy

    2004-01-01

    Over the past 5-6 years, NASA has been developing the Information Power Grid and has a persistent testbed currently based on GT2.4.2. This presentation will begin with an overview of IPG status and services, discuss key milestones in IPG development, and present early as well as expected applications. The presentation will discuss some of the issues encountered in developing a grid including the tension between providing centralized and distributed computing. These issues also affect how the grid is moved into full production. Finally, the presentation will provide current plans for moving IPG into full production, including gaining broad user input, developing acceptance criteria from the production operations group, planning upgrades, and training users.

  15. Studies in Family Planning, Volume 3, Number 5.

    ERIC Educational Resources Information Center

    Population Council, New York, NY.

    The Commission on Population Growth and the American Future was established by Congress in March, 1970, to examine the impact of population change in the United States to the year 2000. Excerpts from their final report, submitted in March, 1972, are presented in this pamphlet. The first eight chapters focus on the present and prospective…

  16. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0003-422] Coral Reef Restoration Plan... for the Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National... availability of a Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan (Plan...

  17. 77 FR 37432 - Final Springfield Plateau Regional Restoration Plan and Environmental Assessment and Finding of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ...-FF03E00000] Final Springfield Plateau Regional Restoration Plan and Environmental Assessment and Finding of... Springfield Plateau Regional Restoration Plan (Plan) and Environmental Assessment and Finding of No... Springfield Plateau Regional Restoration Plan and Environmental Assessment (77 FR 1717). The public comment...

  18. Trajectory planning and control of a 6 DOF manipulator with Stewart platform-based mechanism

    NASA Technical Reports Server (NTRS)

    Nguyen, Charles C.; Antrazi, Sami

    1990-01-01

    The trajectory planning and control was studied of a robot manipulator that has 6 degrees of freedom and was designed based on the mechanism of the Stewart Platform. First the main components of the manipulator is described along with its operation. The solutions are briefly prescribed for the forward and inverse kinematics of the manipulator. After that, two trajectory planning schemes are developed using the manipulator inverse kinematics to track straight lines and circular paths. Finally experiments conducted to study the performance of the developed planning schemes in tracking a straight line and a circle are presented and discussed.

  19. Planing Meeting on Asian/Pacific Joint Production Programme of Materials for Neo-Literates in Rural Areas (Tokyo, Japan, June 7-9, 1993). Report.

    ERIC Educational Resources Information Center

    Asia/Pacific Cultural Centre for UNESCO, Tokyo (Japan).

    This publication provides the final report of a planning meeting to discuss literacy programs of the Asia/Pacific Cultural Center for UNESCO (ACCU) to be carried out under regional cooperation and other materials from the meeting. The final report describes the purpose of the meeting and summarizes these presentations: opening addresses, reports,…

  20. Acoustics Critical Readiness Review

    NASA Technical Reports Server (NTRS)

    Ballard, Kenny

    2010-01-01

    This presentation reviews the status of the acoustic equipment from the medical operations perspective. Included is information about the acoustic dosimeters, sound level meter, and headphones that are planned for use while on orbit. Finally there is information about on-orbit hearing assessments.

  1. 77 FR 52054 - Notice of Availability of the Proposed Bakersfield Resource Management Plan and Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAC06000.L16100000.DQ0000.LXSS095B0000] Notice of Availability of the Proposed Bakersfield Resource Management Plan and Final Environmental... prepared the Proposed Resource Management Plan (RMP) and Final Environmental Impact Statement (EIS) for the...

  2. Effect of the Family and Medical Leave Act on the operation of cafeteria plans. Final regulations.

    PubMed

    2001-10-17

    This document contains final regulations relating to cafeteria plans that reflect changes made by the Family and Medical Leave Act of 1993 (Act). The final regulations provide the public with guidance needed to comply with the Act and affect employees who participate in cafeteria plans.

  3. 78 FR 44592 - Final General Management Plan, Final Wilderness Study, and Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... General Management Plan and Wilderness Study (Final EIS/GMP/WS) for Fort Pulaski National Monument... national monument, the Final EIS/GMP/WS will guide the management of the national monument over the next 20... publication of the Environmental Protection Agency's Notice of Availability of the Final EIS/GMP/WS in the...

  4. Hypersonic Vehicle Propulsion System Simplified Model Development

    NASA Technical Reports Server (NTRS)

    Stueber, Thomas J.; Raitano, Paul; Le, Dzu K.; Ouzts, Peter

    2007-01-01

    This document addresses the modeling task plan for the hypersonic GN&C GRC team members. The overall propulsion system modeling task plan is a multi-step process and the task plan identified in this document addresses the first steps (short term modeling goals). The procedures and tools produced from this effort will be useful for creating simplified dynamic models applicable to a hypersonic vehicle propulsion system. The document continues with the GRC short term modeling goal. Next, a general description of the desired simplified model is presented along with simulations that are available to varying degrees. The simulations may be available in electronic form (FORTRAN, CFD, MatLab,...) or in paper form in published documents. Finally, roadmaps outlining possible avenues towards realizing simplified model are presented.

  5. 78 FR 21245 - Continuity of Operations Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  6. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow whenmore » filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.« less

  7. 45 CFR 1386.36 - Final disapproval of the State plan or plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON DEVELOPMENTAL DISABILITIES, DEVELOPMENTAL DISABILITIES PROGRAM FORMULA GRANT PROGRAMS Federal Assistance to State Developmental Disabilities Councils § 1386.36 Final disapproval of the State plan or plan...

  8. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    PubMed

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  9. Thoracic multidisciplinary tumor board routinely impacts therapeutic plans in patients with lung and esophageal cancer: a prospective cohort study.

    PubMed

    Schmidt, Henner M; Roberts, John M; Bodnar, Artur M; Kunz, Sonia; Kirtland, Steven H; Koehler, Richard P; Hubka, Michal; Low, Donald E

    2015-05-01

    National and subspecialty guidelines for lung and esophageal cancers recommend treatment decisions to be made in a multidisciplinary tumor board (MTB). This study prospectively analyzes the actual impact of presentation at the thoracic tumor board on decision making in thoracic cancer cases. During the electronic submission process for presentation at MTB managing physicians documented their current treatment plan. The initial treatment plan was compared with the MTB final recommendation. Patient demographics, physician's proposed treatment plan, MTB recommendation, and documentation of application of MTB recommendations were prospectively recorded in an Institutional Review Board approved database. Between June 2010 and December 2012, 185 patients with esophageal and 294 patients with lung cancer were presented at the MTB. One hundred sixty-six patients were presented on more than 1 occasion, resulting in 724 assessments of 479 patients. In 48 esophageal cancer patients (26%) and 118 lung cancer patients (40%) MTB recommendations differed from the initial treatment plan. Overall, a differing MTB recommendation from the primary treatment plan occurred in 330 of 724 case presentations (46%). The MTB recommendations changed treatment plans in 40% and staging and assessment plans in 60% of patients. Follow-up in a cohort of 249 patients confirmed that MTB recommendations were followed in 97% of cases. This study validates the impact of the thoracic MTB. Recommendations will differ from the managing providers' initial plan in 26% to 40% of cases. However, MTB recommendations can be successfully initiated in the majority of patients. Complex thoracic cancer patients will benefit from multidisciplinary review and should ideally be presented at tumor board. Copyright © 2015 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  10. Determination of atmospheric dilution for emergency preparedness: a joint EPA-DOE (Environmental Protection Agency-Department of Energy) technical workshop held on October 15-17, 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rogers, S.E.

    1988-10-01

    This workshop was held in Research Triangle Park, NC in October of 1986. The objectives of the workshop were to review the current methods of determining atmospheric dilution for use in hazard identification, emergency-preparedness planning, and emergency response; to provide recommendations for choosing among these methods; and, finally, to define the role of the meteorologist in hazard identification, emergency planning, etc. Several invited papers were presented, and panel discussions were held to meet the objectives. The results are presented and discussed.

  11. Engineering calculations for communications satellite systems planning

    NASA Technical Reports Server (NTRS)

    Walton, E.; Aebker, E.; Mata, F.; Reilly, C.

    1991-01-01

    The final phase of a satellite synthesis project is described. Several methods for generating satellite positionings with improved aggregate carrier to interference characteristics were studied. Two general methods for modifying required separation values are presented. Also, two methods for improving aggregate carrier to interference (C/I) performance of given satellite synthesis solutions are presented. A perturbation of the World Administrative Radio Conference (WARC) synthesis is presented.

  12. 26 CFR 1.401(a)(5)-1 - Special rules relating to nondiscrimination requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... compensation for A's final 5 plan years is as follows: 1995 plan year $10,500 1994 plan year $20,000 1993 plan... this section, an employee's final pay from the employer as of a plan year is the employee's compensation (as defined in section 414(q)(7)) for the year (ending with or within the 5-plan-year period...

  13. Medicare program; prohibition of midyear benefit enhancements for Medicare Advantage organizations. Final rule.

    PubMed

    2008-07-28

    This final rule prohibits Medicare Advantage (MA) organizations, including organizations offering MA plans to employer and union group health plan sponsors, from making midyear changes to nonprescription drug benefits, premiums, and cost-sharing submitted in their approved bids for a given contract year. This final rule also clarifies that MA organizations offering certain kinds of plans restricted to employer and union group health plan sponsors and not open to general enrollment may continue to offer benefit enhancements as they do currently, through means other than midyear benefit enhancements (MYBEs). Programs of all-inclusive care for elderly (PACE) are not subject to the provisions of this final rule and may continue to offer enhanced benefits as specified in our guidance for PACE plans.

  14. IT strategic planning in hospitals: from theory to practice.

    PubMed

    Jaana, Mirou; Teitelbaum, Mari; Roffey, Tyson

    2014-07-01

    To date, IT strategic planning has been mostly theory-based with limited information on "best practices" in this area. This study presents the process and outcomes of IT strategic planning undertaken at a pediatric hospital (PH) in Canada. A five-stage sequential and incremental process was adopted. Various tools / approaches were used including review of existing documentation, internal survey (n = 111), fifteen interviews, and twelve workshops. IT strategic planning was informed by 230 individuals (12 percent of hospital community) and revealed consistency in the themes and concerns raised by participants (e.g., slow IT projects delivery rate, lack of understanding of IT priorities, strained communication with IT staff). Mobile and remote access to patients' information, and an integrated EMR were identified as top priorities. The methodology and used approach revealed effective, improved internal relationships, and ensured commitment to the final IT strategic plan. Several lessons were learned including: maintaining a dynamic approach capable of adapting to the fast technology evolution; involving stakeholders and ensuring continuous communication; using effective research tools to support strategic planning; and grounding the process and final product in existing models. This study contributes to the development of "best practices" in IT strategic planning, and illustrates "how" to apply the theoretical principles in this area. This is especially important as IT leaders are encouraged to integrate evidence-based management into their decision making and practices. The methodology and lessons learned may inform practitioners in other hospitals planning to engage in IT strategic planning in the future.

  15. Supersonics--Airport Noise

    NASA Technical Reports Server (NTRS)

    Bridges, James

    2007-01-01

    At this, the first year-end meeting of the Fundamental Aeronautics Program, an overview of the Airport Noise discipline of the Supersonics Project leads the presentation of technical plans and achievements in this area of the Project. The overview starts by defining the Technical Challenges targeted by Airport Noise efforts, and the Approaches planned to meet these challenges. These are fleshed out in Elements, namely Prediction, Diagnostics, and Engineering, and broken down into Tasks. The Tasks level is where individual researchers' work is defined and from whence the technical presentations to follow this presentation come. This overview also presents the Milestones accomplished to date and to be completed in the next year. Finally, the NASA Research Announcement cooperative agreement activities are covered and tied to the Tasks and Milestones.

  16. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...

  17. Application of geostatistics to coal-resource characterization and mine planning. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kauffman, P.W.; Walton, D.R.; Martuneac, L.

    1981-12-01

    Geostatistics is a proven method of ore reserve estimation in many non-coal mining areas but little has been published concerning its application to coal resources. This report presents the case for using geostatistics for coal mining applications and describes how a coal mining concern can best utilize geostatistical techniques for coal resource characterization and mine planning. An overview of the theory of geostatistics is also presented. Many of the applications discussed are documented in case studies that are a part of the report. The results of an exhaustive literature search are presented and recommendations are made for needed future researchmore » and demonstration projects.« less

  18. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... the Final Staff Guidance Standard Review Plan Section 13.6.3, Revision 1 on Physical Security--Early... NRC is issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.3, Revision 1 on Physical Security...

  19. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... the Final Staff Guidance Standard Review Plan Section 13.6.2, Revision 1 on Physical Security--Design... issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.2, Revision 1 on Physical Security--Design Certification...

  20. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... the Final Staff Guidance Standard Review Plan, Section 13.6.1, Revision 1 on Physical Security... Availability. SUMMARY: The NRC is issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.1, Revision 1 on...

  1. Time, Money, and Quality.

    ERIC Educational Resources Information Center

    Roark, Steven

    2001-01-01

    Presents the fifth installment examining the expansion and renovation project of Longview Community College's Liberal Arts Building in Kansas City (Missouri). Reviewed are the gaining of final approvals from administrators on project plans and the detailing of wall construction, structural systems, HVAC units, and finishes. (GR)

  2. Steady vibrations of wing of circular plan form

    NASA Technical Reports Server (NTRS)

    Kochin, N E

    1953-01-01

    This paper treats the problem of determining the lift, moment, and induced drag of a thin wing of circular plan form in uniform incompressible flow on the basis of linearized theory. As contrasted to a similar paper by Kinner, in which the acceleration potential method was used, the present paper utilizes the concept of the velocity potential. Calculations of the lift and moment are presented for several deformed shapes. It is shown that considerable deviations exist between the strip theory analysis and the more exact theory. The lift, moment, and induced drag are also determined for a harmonically oscillatory circular plan form wing. As contrasted to a similar paper by Schade, in which the acceleration potential method was used, the present paper utilizes the concept of the velocity potential. Expressions for lift, moment, and induced drag are given and finally specialized to the case of a slowly oscillating circular wing.

  3. Arizona Air Quality State Implementation Plans; Final Approval; Douglas, Arizona; Second 10-Year Sulfur Dioxide Maintenance Plan

    EPA Pesticide Factsheets

    EPA is taking final rulemaking action to approve, as part of the State Implementation Plan (SIP) for the State of Arizona, the second 10-year maintenance plan for the Douglas maintenance area for the 1971 National Ambient Air Quality Standards for SO2.

  4. Final rules relating to use of electronic communication and recordkeeping technologies by employee pension and welfare benefit plans. Notice of final rulemaking.

    PubMed

    2002-04-09

    This document contains final rules under Title I of the Employee Retirement Income Security Act of 1974, as amended (ERISA), concerning the disclosure of certain employee benefit plan information through electronic media, and the maintenance and retention of employee benefit plan records in electronic form. The rules establish a safe harbor pursuant to which all pension and welfare benefit plans covered by Title I of ERISA may use electronic media to satisfy disclosure obligations under Title I of ERISA. The rules also provide standards concerning the use of electronic media in the maintenance and retention of records required by sections 107 and 209 of ERISA. The rules affect employee pension and welfare benefit plans, including group health plans, plan sponsors, administrators and fiduciaries, and plan participants and beneficiaries.

  5. Quinault Indian Nation Renewable Energy Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Don Hopps, Institute for Washington's Future; Jesse Nelson, Institute for Washington's Future

    2006-11-28

    The Quinault Indian Nation (Nation) initiated this study on conservation and production of renewable energy because this approach created the opportunity: • To become self-sufficient and gain greater control over the energy the Nation uses; • To generate jobs and businesses for its members; • To better manage, sustain, and protect its resources; • To express the cultural values of the Nation in an important new arena. The Nation has relatively small energy needs. These needs are concentrated at two separate points: the Quinault Beach Resort and Casino (QBRC) and Taholah on the Quinault Indian Reservation (QIR). Except for themore » town of Queets, energy needs are small and scattered. The needs vary greatly over the season. The small scale, widely dispersed, and variable nature of these needs presents a unique challenge to the Nation. Meeting these needs requires a resource and technology that is flexible, effective, and portable. Conservation is the most cost-effective way to meet any need. It is especially effective in a situation like this where production would leave a high per unit cost. This plan is based on first gaining energy savings through conservation. Major savings are possible through: 1. Upgrading home appliances on the QIR. 2. Weatherizing homes and facilities. 3. Changes in lighting/ventilation in the QBRC pool room. These elements of the plan are already being implemented and promise to save the Nation around a quarter of its present costs. Wood biomass is the best resource available to the QIN for energy production either on-site or for commercial development. It is abundant, flexible and portable. Its harvesting has high job potential and these jobs are a good fit for the present “skill set” of the QIN. This plan focuses on using wood biomass to produce energy and other value-added products. Our study considered various technologies and approaches to using wood for energy. We considered production for both on-site and commercial production. This plan calls for commercial-scale production only, with the QIN being the first “customer” for the product. This plan favors employing the pyrolysis technology to produce bio-oil, heat, and char. We favor this approach and technology because it is the most cost effective way to use the available resource. Its main product, bio-oil, has proven utility for the production of heat and electricity. It has promise for use as an alternative fuel, which is a much higher value than present uses of wood and it meets the QIN need for flexibility, scalability, and portability. Char, the secondary product from the pyrolysis process, has proven value-added uses. In addition to these direct benefits, the use of biomass in pyrolysis technology has significant indirect benefits. These benefits include the fact that the technology is a good fit with the Nation’s cultural values, i.e., environmental protection and the holistic use of a resource. It fits well with current QIN enterprises. For example, char could be processed into a charcoal co-product for QIN fish. Finally, the QIN can become a leader in developing and demonstrating this innovative approach to the use of wood. This plan proposes key organization steps to insure both excellent implementation of the plan and taking the best advantage of the processes and facilities put in place. This plan calls for two new QIN organizations: an energy production/distribution corporation and a community development corporation. The production/distribution corporation can be either a utility or a business enterprise that develops and markets renewable energy. The community development corporation can be a not-for-profit to support the QIN in taking best advantage of its energy opportunities. The production and distribution corporation is the subject of a further business planning effort now underway. This plan envisions a community development corporation that works directly with the Business Committee on research, education, and project development. Specifically, this corporation can seek grant funding to research energy matters such as the BPA direct sale of energy proposal, identify key business opportunities like charcoal production and train QIN members in business building, and establish a renewable energy education program and center to enhance the education of QIN youth and market to schools and community colleges in Western Washington. Overall, this final report includes the final Renewable Energy Plan for the QIN, the final Financial Analysis, and appendices. The two final plans are the culmination of research and planning represented by the appendices.« less

  6. Development and Implementation of a Model Training Program to Assist Special Educators, Parks and Resource Management Personnel and Parents to Cooperatively Plan and Conduct Outdoor/Environmental Education Programs for Handicapped Children and Youth. Final Report.

    ERIC Educational Resources Information Center

    Vinton, Dennis A.; Zachmeyer, Richard F.

    This final report presents a description of a 3-year project to develop and implement a model training program (for special education personnel, park and resource management personnel, and parents of disabled children) designed to promote outdoor environmental education for disabled children. The project conducted 22 training workshops (2-5 days)…

  7. The CHEM Study Story.

    ERIC Educational Resources Information Center

    Merrill, Richard J.; Ridgway, David W.

    The history of the planning, funding, preparation of preliminary materials, teacher preparation, trial teaching, evaluation, revision and final publication of the CHEM Study materials is presented. The anecdotal account points out the difficulties encountered, the solutions found and the pitfalls avoided so that the experience gained may be useful…

  8. Picassoesque Portraits.

    ERIC Educational Resources Information Center

    Basso, Robert

    1998-01-01

    Presents a lesson plan that enabled students to create their own portraits in the style of Pablo Picasso; students utilized their initial collages/drawings, enlarging them with an overhead projector, to paint their final products using oil pastels. Indicates the students also learned about the different "periods" of Picasso's artistic…

  9. Amendment to the interim final rules for group health plans and health insurance coverage relating to status as a grandfathered health plan under the Patient Protection and Affordable Care Act. Amendment to interim final rules with request for comments.

    PubMed

    2010-11-17

    This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  10. Excavated Soils Management Plan for AOCs 44 and 52, Fort Devens

    DTIC Science & Technology

    1994-05-01

    I FORT DEVENS AOCs 44 AND 52 I I I FINAL EXCAVATED SOILS MANAGEMENT PLAN DATA ITEM A009I I U 20070424310 I CONTRACT DAAA15-91-D-0008 I U.S. ARMY...obselete FINAL EXCAVATED SOILS MANAGEMENT PLAN FOR AOCs 44 AND 52 FORT DEVENS Prepared for. U.S. Army Enviromnental Center Aberdeen Proving Ground, Maryland...BLANK 3 I I I I I I I I I I FINAL EXCAVATED SOILS MANAGEMENT PLAN FOR AOCs 44 AND 52 FORT DEVENS TABLE OF CONTENTS 1 Section Title Page No. 1.0

  11. Final Inventory Work-Off Plan for ORNL transuranic wastes (1986 version)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dickerson, L.S.

    1988-05-01

    The Final Inventory Work-Off Plan (IWOP) for ORNL Transuranic Wastes addresses ORNL's strategy for retrieval, certification, and shipment of its stored and newly generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP), the proposed geologic repository near Carlsbad, New Mexico. This document considers certification compliance with the WIPP waste acceptance criteria (WAC) and is consistent with the US Department of Energy's Long-Range Master Plan for Defense Transuranic Waste Management. This document characterizes Oak Ridge National Laboratory's (ORNL's) TRU waste by type and estimates the number of shipments required to dispose of it; describesmore » the methods, facilities, and systems required for its certification and shipment; presents work-off strategies and schedules for retrieval, certification, and transportation; discusses the resource needs and additions that will be required for the effort and forecasts costs for the long-term TRU waste management program; and lists public documentation required to support certification facilities and strategies. 22 refs., 6 figs., 10 tabs.« less

  12. Post-test navigation data analysis techniques for the shuttle ALT

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Postflight test analysis data processing techniques for shuttle approach and landing tests (ALT) navigation data are defined. Postfight test processor requirements are described along with operational and design requirements, data input requirements, and software test requirements. The postflight test data processing is described based on the natural test sequence: quick-look analysis, postflight navigation processing, and error isolation processing. Emphasis is placed on the tradeoffs that must remain open and subject to analysis until final definition is achieved in the shuttle data processing system and the overall ALT plan. A development plan for the implementation of the ALT postflight test navigation data processing system is presented. Conclusions are presented.

  13. An honest day's work: pay for performance in a pediatric radiology department.

    PubMed

    Bisset, George S

    2017-06-01

    Compensation models in radiology take a variety of forms, but regardless of practice type, successful models must reward productivity, be simple, and epitomize fairness. The ideal model should also be flexible enough to transition, based upon the changing strategic goals of a department. The plan should be constructed around rewarding the behaviors that the organization values. In this minisymposium article the author presents the value of different types of compensation plans and discusses advantages and disadvantages. Finally, the author presents a pay-for-performance model that has had long-term success at a private-turned-academic practice in pediatric radiology.

  14. 78 FR 34918 - Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Environmental Management (IDEM) submitted the State Plan on February 27, 2013. The State Plan is consistent with... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2013-0372; FRL-9821-1] Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana AGENCY...

  15. National Institute on Disability and Rehabilitation Research--Notice of Final Long-Range Plan for Fiscal Years 2005-2009. Federal Register, Part III: Department of Education

    ERIC Educational Resources Information Center

    National Archives and Records Administration, 2006

    2006-01-01

    The Assistant Secretary for Special Education and Rehabilitative Services (OSERS) publishes the Final Long-Range Plan (Final Plan) for the National Institute on Disability and Rehabilitation Research (NIDRR) for FY 2005 through 2009. As required by the Rehabilitation Act of 1973, as amended (Act), the Assistant Secretary takes this action to…

  16. Soft tissue waxup and mock-up as key factors in a treatment plan: case presentation.

    PubMed

    Viana, Pedro Couto; Correia, André; Neves, Manuel; Kovacs, Zsolt; Neugbauer, Rudiger

    2012-01-01

    Rehabilitation of edentulous spaces in esthetic areas is a challenge to the clinician due to the loss of soft tissues. In these clinical situations, it would be desirable to evaluate and predict the gingival architecture to recover in the oral rehabilitation. To fulfill this need, the diagnostic wax should anticipate the final rehabilitation with the integration of hard and soft tissue. Thus, it is essential to produce a diagnostic waxup that integrates these two components that are simultaneously seeking to recreate the harmony of white and pink esthetic. This diagnostic waxup will be the basis for the creation of the provisional prosthesis and a soft tissue mock-up. After placing the provisional prosthesis in the mouth, the soft tissue mock-up can be applied to assess its esthetic impact at facial and intraoral level. Dentist and patient should objectively assess the appearance of the final result. After approval of this rehabilitation concept, the virtual surgical planning can be performed and the surgical guide can be designed, allowing the treatment to take place. This protocol allows the development of a rigorous treatment plan based on the integration of teeth and gingiva component. The waxup and the soft tissue mock-up play a significant role, since they allow an earlier evaluation of the esthetic result, better prosthetic and surgical planning, and it allows us to anticipate the need for gingiva-colored ceramics use. The authors present a clinical case report of the importance of the wax-up and soft tissue mock-up in the treatment plan.

  17. BUYING AND SELLING A SMALL BUSINESS.

    DTIC Science & Technology

    Part One takes the form of a manual of the processes and techniques of buying and selling a small business . This material is presented in a...finalizing the transaction and planning for operation under new ownership and management . Part Two reports the nature of the research conducted during the

  18. EXPLORATION OF SIMULATION AS A RETIREMENT EDUCATION TECHNIQUE. FINAL REPORT.

    ERIC Educational Resources Information Center

    BOOCOCK, SARANE SPENCE; SPRAGUE, NORMAN

    A PILOT PROJECT EXPLORED THE ADAPTATION OF SIMULATION TECHNIQUES TO FOUR RETIREMENT PROBLEMS--FINANCIAL POSITION, PHYSICAL ENVIRONMENT (HOUSING CHOICES), HEALTH, AND SOCIAL ENVIRONMENT (PLANNING AND GAINING SKILLS BEFORE RETIREMENT). A PRELIMINARY MODEL OF A GAME IN RETIREMENT FINANCE PRESENTS PLAYERS WITH THREE INVESTMENT SITUATIONS--SAVINGS…

  19. Energy management guidelines for rail transit systems : volume I. final report

    DOT National Transportation Integrated Search

    1986-09-01

    The cost of electricity is a significant portion of the operating costs of rail transit systems. The impact of increasing energy costs is felt by those systems presently in operation and will be felt by those in the planning or construction phases. B...

  20. 76 FR 48006 - Limited Federal Implementation Plan; Prevention of Significant Deterioration; California; North...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ... Implementation Plan; Prevention of Significant Deterioration; California; North Coast Unified Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing a limited Federal Implementation Plan (FIP) for the North Coast Unified Air Quality Management...

  1. 29 CFR 1952.313 - Final approval determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 1902. Accordingly, the Hawaii plan was granted final approval and concurrent Federal enforcement... employment in Hawaii. The plan does not cover maritime employment in the private sector; Federal government... effective as operations under the Federal program; to submit plan supplements in accordance with 29 CFR part...

  2. 29 CFR 1952.294 - Final approval determination.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...

  3. 29 CFR 1952.294 - Final approval determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...

  4. Vision-based navigation in a dynamic environment for virtual human

    NASA Astrophysics Data System (ADS)

    Liu, Yan; Sun, Ji-Zhou; Zhang, Jia-Wan; Li, Ming-Chu

    2004-06-01

    Intelligent virtual human is widely required in computer games, ergonomics software, virtual environment and so on. We present a vision-based behavior modeling method to realize smart navigation in a dynamic environment. This behavior model can be divided into three modules: vision, global planning and local planning. Vision is the only channel for smart virtual actor to get information from the outside world. Then, the global and local planning module use A* and D* algorithm to find a way for virtual human in a dynamic environment. Finally, the experiments on our test platform (Smart Human System) verify the feasibility of this behavior model.

  5. Comparison of treatment plans: a retrospective study by the method of radiobiological evaluation

    NASA Astrophysics Data System (ADS)

    Puzhakkal, Niyas; Kallikuzhiyil Kochunny, Abdullah; Manthala Padannayil, Noufal; Singh, Navin; Elavan Chalil, Jumanath; Kulangarakath Umer, Jamshad

    2016-09-01

    There are many situations in radiotherapy where multiple treatment plans need to be compared for selection of an optimal plan. In this study we performed the radiobiological method of plan evaluation to verify the treatment plan comparison procedure of our clinical practice. We estimated and correlated various radiobiological dose indices with physical dose metrics for a total of 30 patients representing typical cases of head and neck, prostate and brain tumors. Three sets of plans along with a clinically approved plan (final plan) treated by either Intensity Modulated Radiation Therapy (IMRT) or Rapid Arc (RA) techniques were considered. The study yielded improved target coverage for final plans, however, no appreciable differences in doses and the complication probabilities of organs at risk were noticed. Even though all four plans showed adequate dose distributions, from dosimetric point of view, the final plan had more acceptable dose distribution. The estimated biological outcome and dose volume histogram data showed least differences between plans for IMRT when compared to RA. Our retrospective study based on 120 plans, validated the radiobiological method of plan evaluation. The tumor cure or normal tissue complication probabilities were found to be correlated with the corresponding physical dose indices.

  6. Consulta regional sobre investigacion en educacion y toma de decisiones en America Latina: Informe final (Lima, Peru, 11-15 de mayo de 1987) (Regional Meeting on Research in Education and Decision Making in Latin America: Final Report [Lima, Peru, May 11-15, 1987]).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Santiago (Chile). Regional Office for Education in Latin America and the Caribbean.

    This report presents the highlights of a United Nations Educational, Scientific, and Cultural Organization (UNESCO) conference that was convened to give impetus to and encourage research programs, to analyze research policy formation, and to establish research priorities in the field of educational planning and administration. The document…

  7. Robotic-Arm Assisted Total Knee Arthroplasty Demonstrated Greater Accuracy and Precision to Plan Compared with Manual Techniques.

    PubMed

    Hampp, Emily L; Chughtai, Morad; Scholl, Laura Y; Sodhi, Nipun; Bhowmik-Stoker, Manoshi; Jacofsky, David J; Mont, Michael A

    2018-05-01

    This study determined if robotic-arm assisted total knee arthroplasty (RATKA) allows for more accurate and precise bone cuts and component position to plan compared with manual total knee arthroplasty (MTKA). Specifically, we assessed the following: (1) final bone cuts, (2) final component position, and (3) a potential learning curve for RATKA. On six cadaver specimens (12 knees), a MTKA and RATKA were performed on the left and right knees, respectively. Bone-cut and final-component positioning errors relative to preoperative plans were compared. Median errors and standard deviations (SDs) in the sagittal, coronal, and axial planes were compared. Median values of the absolute deviation from plan defined the accuracy to plan. SDs described the precision to plan. RATKA bone cuts were as or more accurate to plan based on nominal median values in 11 out of 12 measurements. RATKA bone cuts were more precise to plan in 8 out of 12 measurements ( p  ≤ 0.05). RATKA final component positions were as or more accurate to plan based on median values in five out of five measurements. RATKA final component positions were more precise to plan in four out of five measurements ( p  ≤ 0.05). Stacked error results from all cuts and implant positions for each specimen in procedural order showed that RATKA error was less than MTKA error. Although this study analyzed a small number of cadaver specimens, there were clear differences that separated these two groups. When compared with MTKA, RATKA demonstrated more accurate and precise bone cuts and implant positioning to plan. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  8. Hitchhiker mission operations: Past, present, and future

    NASA Technical Reports Server (NTRS)

    Anderson, Kathryn

    1995-01-01

    What is mission operations? Mission operations is an iterative process aimed at achieving the greatest possible mission success with the resources available. The process involves understanding of the science objectives, investigation of which system capabilities can best meet these objectives, integration of the objectives and resources into a cohesive mission operations plan, evaluation of the plan through simulations, and implementation of the plan in real-time. In this paper, the authors present a comprehensive description of what the Hitchhiker mission operations approach is and why it is crucial to mission success. The authors describe the significance of operational considerations from the beginning and throughout the experiment ground and flight systems development. The authors also address the necessity of training and simulations. Finally, the authors cite several examples illustrating the benefits of understanding and utilizing the mission operations process.

  9. 75 FR 34669 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... Promulgation of Air Quality Implementation Plans; Maryland; Transportation Conformity Regulations AGENCY... Implementation Plan (SIP) revision submitted by Maryland for Transportation Conformity Regulations. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final...

  10. Amendments to Summary Plan Description regulations. Pension and Welfare Benefits Administration, Labor. Final rule.

    PubMed

    2000-11-21

    This document contains a final rule amending the regulations governing the content of the Summary Plan Description (SPD) required to be furnished to employee benefit plan participants and beneficiaries under the Employee Retirement Income Security Act of 1974, as amended (ERISA). These amendments implement information disclosure recommendations of the President's Advisory Commission on Consumer Protection and Quality in the Health Care Industry, as set forth in their November 20, 1997, report, "Consumer Bill of Rights and Responsibilities." Specifically, the amendments clarify benefit, medical provider, and other information required to be disclosed in, or as part of, the SPD of a group health plan and repeal the limited exemption with respect to SPDs of welfare plans providing benefits through qualified health maintenance organizations (HMOs). In addition, this document contains several amendments updating and clarifying provisions relating to the content of SPDs that affect both pension and welfare benefit plans. This document also adopts in final form certain regulations that were effective on an interim basis implementing amendments to ERISA enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA). This final rule will affect employee pension and welfare benefit plans, including group health plans, as well as administrators, fiduciaries, participants and beneficiaries of such plans.

  11. Claims Procedure for Plans Providing Disability Benefits. Final rule.

    PubMed

    2016-12-19

    This document contains a final regulation revising the claims procedure regulations under the Employee Retirement Income Security Act of 1974 (ERISA) for employee benefit plans providing disability benefits. The final rule revises and strengthens the current rules primarily by adopting certain procedural protections and safeguards for disability benefit claims that are currently applicable to claims for group health benefits pursuant to the Affordable Care Act. This rule affects plan administrators and participants and beneficiaries of plans providing disability benefits, and others who assist in the provision of these benefits, such as third-party benefits administrators and other service providers.

  12. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into amore » 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.« less

  13. Sketching Designs Using the Five Design-Sheet Methodology.

    PubMed

    Roberts, Jonathan C; Headleand, Chris; Ritsos, Panagiotis D

    2016-01-01

    Sketching designs has been shown to be a useful way of planning and considering alternative solutions. The use of lo-fidelity prototyping, especially paper-based sketching, can save time, money and converge to better solutions more quickly. However, this design process is often viewed to be too informal. Consequently users do not know how to manage their thoughts and ideas (to first think divergently, to then finally converge on a suitable solution). We present the Five Design Sheet (FdS) methodology. The methodology enables users to create information visualization interfaces through lo-fidelity methods. Users sketch and plan their ideas, helping them express different possibilities, think through these ideas to consider their potential effectiveness as solutions to the task (sheet 1); they create three principle designs (sheets 2,3 and 4); before converging on a final realization design that can then be implemented (sheet 5). In this article, we present (i) a review of the use of sketching as a planning method for visualization and the benefits of sketching, (ii) a detailed description of the Five Design Sheet (FdS) methodology, and (iii) an evaluation of the FdS using the System Usability Scale, along with a case-study of its use in industry and experience of its use in teaching.

  14. Final (Tier 1) environmental impact statement for the Galileo and Ulysses Missions

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Presented here is a Final (Tier 1) Environmental Impact Statement (EIS) addressing the potential environmental consequences associated with continuing the modifications of the Galileo and Ulysses spacecraft for launch using a booster/upper stage combination that is different from the one planned for use prior to the Challenger accident, while conducting the detailed safety and environmental analysis in order to preserve the October 1989 launch opportunity for Galileo and an October 1990 launch opportunity for Ulysses. While detailed safety and environmental analyses associated with the missions are underway, they currently are not complete. Nevertheless, sufficient information is available to enable a choice among the reconfiguration alternatives presented. Relevant assessments of the potential for environmental impacts are presented.

  15. Patient protection and Affordable Care Act; data collection to support standards related to essential health benefits; recognition of entities for the accreditation of qualified health plans. Final rule.

    PubMed

    2012-07-20

    This final rule establishes data collection standards necessary to implement aspects of section 1302 of the Patient Protection and Affordable Care Act (Affordable Care Act), which directs the Secretary of Health and Human Services to define essential health benefits. This final rule outlines the data on applicable plans to be collected from certain issuers to support the definition of essential health benefits. This final rule also establishes a process for the recognition of accrediting entities for purposes of certification of qualified health plans.

  16. 76 FR 40394 - Final Plan for Fiscal Year 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... DEPARTMENT OF JUSTICE Office of Juvenile Justice and Delinquency Prevention [OJP (OJJDP) Docket No. 1563] Final Plan for Fiscal Year 2011 AGENCY: Office of Juvenile Justice and Delinquency Prevention.... SUMMARY: The Office of Juvenile Justice and Delinquency Prevention is publishing this notice of its Final...

  17. Science and Observation Recommendations for Future NASA Carbon Cycle Research

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Collatz, G. J.; Kawa, S. R.; Gregg, W. W.; Gervin, J. C.; Abshire, J. B.; Andrews, A. E.; Behrenfeld, M. J.; Demaio, L. D.; Knox, R. G.

    2002-01-01

    Between October 2000 and June 2001, an Agency-wide planning, effort was organized by elements of NASA Goddard Space Flight Center (GSFC) to define future research and technology development activities. This planning effort was conducted at the request of the Associate Administrator of the Office of Earth Science (Code Y), Dr. Ghassem Asrar, at NASA Headquarters (HQ). The primary points of contact were Dr. Mary Cleave, Deputy Associate Administrator for Advanced Planning at NASA HQ (Headquarters) and Dr. Charles McClain of the Office of Global Carbon Studies (Code 970.2) at GSFC. During this period, GSFC hosted three workshops to define the science requirements and objectives, the observational and modeling requirements to meet the science objectives, the technology development requirements, and a cost plan for both the science program and new flight projects that will be needed for new observations beyond the present or currently planned. The plan definition process was very intensive as HQ required the final presentation package by mid-June 2001. This deadline was met and the recommendations were ultimately refined and folded into a broader program plan, which also included climate modeling, aerosol observations, and science computing technology development, for contributing to the President's Climate Change Research Initiative. This technical memorandum outlines the process and recommendations made for cross-cutting carbon cycle research as presented in June. A separate NASA document outlines the budget profiles or cost analyses conducted as part of the planning effort.

  18. Explorers of the Universe

    NASA Technical Reports Server (NTRS)

    Alvarez, Marino C.; Busby, Michael R.; Sotoohi, Goli; Rodriguez, William J.; Hennig, Lee Ann; Berenty, Jerry; King, Terry; Grener, Doreen; Kruzan, John

    1998-01-01

    The Explorers of the Universe is a multifaceted scientific/literacy project that involves teachers and their students with problem oriented situations using authentic materials. This paper presents examples of self-directed cases researched by high school students and the met acognitive tools they use in the planning, carrying out, and finalizing their reports.

  19. Assessment of Techniques for Evaluating Computer Systems for Federal Agency Procurements. Final Report.

    ERIC Educational Resources Information Center

    Letmanyi, Helen

    Developed to identify and qualitatively assess computer system evaluation techniques for use during acquisition of general purpose computer systems, this document presents several criteria for comparison and selection. An introduction discusses the automatic data processing (ADP) acquisition process and the need to plan for uncertainty through…

  20. Interactive Video Program. Final Report and Recommendations.

    ERIC Educational Resources Information Center

    Midwestern Higher Education Commission, Minneapolis, MN.

    This report presents recommendations on interactive video transmission standards, equipment, room designs, and service plans for member institutions of the Midwestern Higher Education Commission (MHEC) and reviews MHEC's efforts to find and contract for such services with vendors. The report describes the MHEC objective of establishing a dial-up,…

  1. Asset Management Plan: 1998-2003.

    ERIC Educational Resources Information Center

    Jefferson County School District R-1, Denver, CO.

    The Jefferson County School District (Denver, Colorado) presents its final scheduling and funding source information for the 1998-2003 capital improvement program and the status of the 1992-1997 completed capital improvement project costs compared to the budget. Funding data are detailed for each of the district's 182 public schools, special use…

  2. Computer-aided resource planning and scheduling for radiological services

    NASA Astrophysics Data System (ADS)

    Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.

    1996-05-01

    There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.

  3. Final Work Plan: Targeted Investigation at York, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan,more » the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.« less

  4. 75 FR 72963 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile Organic Compound Emissions From Industrial Solvent Cleaning Operations; Withdrawal of Direct Final Rule AGENCY: Environmental Protection... withdrawing the direct final rule to approve revisions to Maryland's State Implementation Plan (SIP). This SIP...

  5. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Harpers Ferry National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... guidance to park management for administration, development, and interpretation of park resources over the... General Management Plan for Harpers Ferry National Historical Park. SUMMARY: Pursuant to the National... availability of a Final Environmental Impact Statement for the General Management Plan for Harpers Ferry [[Page...

  6. 76 FR 60525 - Final Wilderness and Backcountry Management Plan and Environmental Impact Statement for Isle...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... and Environmental Impact Statement for Isle Royale National Park, MI AGENCY: National Park Service... the availability of a Final Wilderness and Backcountry Management Plan and Environmental Impact... the Internet through the NPS Planning, Environment, and Public Comment Web site ( http://parkplanning...

  7. 76 FR 77900 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  8. 76 FR 13883 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  9. 78 FR 16401 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  10. 78 FR 35754 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  11. 77 FR 56770 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  12. Medicaid program; self-directed personal assistance services program State Plan option (cash and counseling). Final rule.

    PubMed

    2008-10-03

    This final rule provides guidance to States that want to administer self-directed personal assistance services through their State Plans, as authorized by the Deficit Reduction Act of 2005. The State plan option allows beneficiaries, through an approved self-directed services plan and budget, to purchase personal assistance services. The rule also provides guidance to ensure beneficiary health and welfare and financial accountability of the State Plan option.

  13. 75 FR 69709 - Office of New Reactors; Notice of Availability of the Final Staff Guidance; Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... the Final Staff Guidance; Standard Review Plan, Section 13.6.6, Revision 0 on Cyber Security Plan... Reports for Nuclear Power Plants,'' Section 13.6.6, Revision 0 on ``Cyber Security Plan'' (Agencywide.... Disposition: On May 13, 2010, the NRC staff issued the proposed Revision 0 on SRP Section 13.6.6 on ``Cyber...

  14. Differential-Evolution Control Parameter Optimization for Unmanned Aerial Vehicle Path Planning

    PubMed Central

    Kok, Kai Yit; Rajendran, Parvathy

    2016-01-01

    The differential evolution algorithm has been widely applied on unmanned aerial vehicle (UAV) path planning. At present, four random tuning parameters exist for differential evolution algorithm, namely, population size, differential weight, crossover, and generation number. These tuning parameters are required, together with user setting on path and computational cost weightage. However, the optimum settings of these tuning parameters vary according to application. Instead of trial and error, this paper presents an optimization method of differential evolution algorithm for tuning the parameters of UAV path planning. The parameters that this research focuses on are population size, differential weight, crossover, and generation number. The developed algorithm enables the user to simply define the weightage desired between the path and computational cost to converge with the minimum generation required based on user requirement. In conclusion, the proposed optimization of tuning parameters in differential evolution algorithm for UAV path planning expedites and improves the final output path and computational cost. PMID:26943630

  15. SPANR planning and scheduling

    NASA Astrophysics Data System (ADS)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  16. Tank 241-SY-102 January 2000 Compatibility Grab Samples Analytical Results for the Final Report [SEC 1 and 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BELL, K.E.

    This document is the format IV, final report for the tank 241-SY-102 (SY-102) grab samples taken in January 2000 to address waste compatibility concerns. Chemical, radiochemical, and physical analyses on the tank SY-102 samples were performed as directed in Comparability Grab Sampling and Analysis Plan for Fiscal Year 2000 (Sasaki 1999). No notification limits were exceeded. Preliminary data on samples 2SY-99-5, -6, and -7 were reported in ''Format II Report on Tank 241-SY-102 Waste Compatibility Grab Samples Taken in January 2000'' (Lockrem 2000). The data presented here represent the final results.

  17. 76 FR 38146 - Revision to the Final Principles of Integrated Resource Planning for Use in Resource Acquisition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... DEPARTMENT OF ENERGY Western Area Power Administration Revision to the Final Principles of... Administration (Western) published proposed Principles for Integrated Resource planning (IRP) for use in its... December 6, 1994. After considering public comments on the proposed principles, Western adopted the Final...

  18. Applying new science leadership theory in planning an international nursing student practice experience in Nepal.

    PubMed

    Doyle, Rose Marie

    2004-09-01

    Planning an international practice experience for nursing students is a challenging, but rewarding, opportunity. Kwantlen University College faculty members' experience of planning for 8 Bachelor of Science in Nursing students to study abroad was no exception. Faculty members' and students' interest prompted a request for a placement in Nepal. The faculty members involved in the planning were dedicated to using a process that would enable them to remain true to the program philosophy and theoretical underpinnings throughout the entire experience, from the planning phase to the follow-up presentation. Using Wheatley's theory, the students and faculty members reexamined their personal leadership styles to ensure they remained relationship focused, rather than task focused. Wheatley maintained that because the potentiality lies in building strong relationships, it is important to support the creative power that lies in those involved in a project. This article describes new science leadership and relates it to the planning phase for the practice experience in Nepal. Then, reflections on how the philosophy of the program may have influenced the experience are shared. Finally, critical reflection on using this theory in nursing education is presented.

  19. IPG Power Grid Overview

    NASA Technical Reports Server (NTRS)

    Hinke, Thomas

    2003-01-01

    This presentation will describe what is meant by grids and then cover the current state of the IPG. This will include an overview of the middleware that is key to the operation of the grid. The presentation will then describe some of the future directions that are planned for the IPG. Finally the presentation will conclude with a brief overview of the Global Grid Forum, which is a key activity that will contribute to the successful availability of grid components.

  20. Numerical aerodynamic simulation program long haul communications prototype

    NASA Technical Reports Server (NTRS)

    Cmaylo, Bohden K.; Foo, Lee

    1987-01-01

    This document is a report of the Numerical Aerodynamic Simulation (NAS) Long Haul Communications Prototype (LHCP). It describes the accomplishments of the LHCP group, presents the results from all LHCP experiments and testing activities, makes recommendations for present and future LHCP activities, and evaluates the remote workstation accesses from Langley Research Center, Lewis Research Center, and Colorado State University to Ames Research Center. The report is the final effort of the Long Haul (Wideband) Communications Prototype Plan (PT-1133-02-N00), 3 October 1985, which defined the requirements for the development, test, and operation of the LHCP network and was the plan used to evaluate the remote user bandwidth requirements for the Numerical Aerodynamic Simulation Processing System Network.

  1. 77 FR 39180 - Withdrawal of Direct Final Rule Revising the California State Implementation Plan, South Coast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9690-9] Withdrawal of Direct Final Rule Revising the California State Implementation Plan, South Coast Air Quality Management... State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District...

  2. A Functional Plan for an Illinois Library Telecommunications Network. The Final Report.

    ERIC Educational Resources Information Center

    Calabrese, Alice; And Others

    This final report describes the plan developed by the Northern Illinois Learning Resources Cooperative, a consortium of 44 community colleges and other academic institutions, which was awarded a Library Services and Construction Act (LSCA) Title III planning grant to research the requirements for a statewide electronic network that would provide…

  3. Federal employees health benefits program: discontinuance of health plan in an emergency. Final regulation.

    PubMed

    2007-01-17

    The Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) regulations regarding discontinuance of a health plan to include situations in which a health plan becomes incapacitated, either temporarily or permanently, as the result of a disaster.

  4. 77 FR 65125 - Approval and Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... controls are enforced through the associated SIP rules or Federal Implementation Plans (FIPs). Any purchase... Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure Requirements for the 1997 and... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to approve the State Implementation...

  5. NASA/USRA advanced design program

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This report analyzes and presents a preliminary design for an experimental hypersonic vehicle. This plane will have a cruise speed of Mach 12 for one minute at an altitude of 120,000 feet. The major design areas of aerodynamics, propulsion, and weights are discussed in depth. An elementary analysis of thermal protection, trajectory, and cost is also presented. Finally, a discussion of future plans and recommendations is given, and overall conclusions are drawn.

  6. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  7. NASA strategic plan

    NASA Technical Reports Server (NTRS)

    1995-01-01

    NASA's Plan summarizes the Agency's vision, mission, and values. Specific goals are listed for each externally focused Enterprise: Mission to Planet Earth, Aeronautics, Human Exploration and Development of Space, Space Science, and Space Technology. These Enterprises satisfy the needs of customers external to NASA. The Strategic Functions (Space Communications, Human Resources, and Physical Resources) are necessary in order to meet the goals of the Enterprises. The goals of these Functions are also presented. All goals must be met while adhering to the discussed values and operating principles of NASA. A final section outlines the implementing strategy.

  8. 77 FR 28785 - Revisions to Federal Implementation Plans To Reduce Interstate Transport of Fine Particulate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Ozone AGENCY: Environmental Protection Agency (EPA). ACTION: Withdrawal of direct final rule. SUMMARY... Particulate Matter and Ozone'' as a direct final rule on February 21, 2012. Because the EPA received adverse... Implementation Plans To Reduce Interstate Transport of Fine Particulate Matter and Ozone'' as a direct final rule...

  9. United States Air Force 611th Air Support Group Civil Engineering Squadron, Elmendorf AFB, Alaska. Remedial investigation and feasibility study Point Lay Radar Installation, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karmi, S.

    1996-03-04

    The United States Air Force (Air Force) has prepared this Remedial Investigation/Feasibility Study (RI/FS) report to present the results of RI/FS activities at four sites located at the Point Lay radar installation. The remedial investigation (RI) field activities were conducted at the Point Lay radar installation during the summer of 1993. The four sites at Point Lay were investigated because they were suspected of being contaminated with hazardous substances. RI activities were conducted using methods and procedures specified in the RI/FS Work Plan, Sampling and Analysis Plan (SAP), and Health and Safety Plan.

  10. Design and Operation of Power Systems with Large Amounts of Wind Power: Final Summary Report, IEA WIND Task 25, Phase Three 2012-2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holttinen, Hannele; Kiviluoma, Juha; Forcione, Alain

    2016-06-01

    This report summarizes recent findings on wind integration from the 16 countries participating in the International Energy Agency (IEA) Wind collaboration research Task 25 in 2012-2014. Both real experience and studies are reported. The national case studies address several impacts of wind power on electric power systems. In this report, they are grouped under long-term planning issues and short-term operational impacts. Long-term planning issues include grid planning and capacity adequacy. Short-term operational impacts include reliability, stability, reserves, and maximizing the value in operational timescales (balancing related issues). The first section presents variability and uncertainty of power system-wide wind power, andmore » the last section presents recent wind integration studies for higher shares of wind power. Appendix 1 provides a summary of ongoing research in the national projects contributing to Task 25 in 2015-2017.« less

  11. Current-Sensitive Path Planning for an Underactuated Free-Floating Ocean Sensorweb

    NASA Technical Reports Server (NTRS)

    Dahl, Kristen P.; Thompson, David R.; McLaren, David; Chao, Yi; Chien, Steve

    2011-01-01

    This work investigates multi-agent path planning in strong, dynamic currents using thousands of highly under-actuated vehicles. We address the specific task of path planning for a global network of ocean-observing floats. These submersibles are typified by the Argo global network consisting of over 3000 sensor platforms. They can control their buoyancy to float at depth for data collection or rise to the surface for satellite communications. Currently, floats drift at a constant depth regardless of the local currents. However, accurate current forecasts have become available which present the possibility of intentionally controlling floats' motion by dynamically commanding them to linger at different depths. This project explores the use of these current predictions to direct float networks to some desired final formation or position. It presents multiple algorithms for such path optimization and demonstrates their advantage over the standard approach of constant-depth drifting.

  12. The production deployment of IPv6 on WLCG

    NASA Astrophysics Data System (ADS)

    Bernier, J.; Campana, S.; Chadwick, K.; Chudoba, J.; Dewhurst, A.; Eliáš, M.; Fayer, S.; Finnern, T.; Grigoras, C.; Hartmann, T.; Hoeft, B.; Idiculla, T.; Kelsey, D. P.; López Muñoz, F.; Macmahon, E.; Martelli, E.; Millar, A. P.; Nandakumar, R.; Ohrenberg, K.; Prelz, F.; Rand, D.; Sciabà, A.; Tigerstedt, U.; Voicu, R.; Walker, C. J.; Wildish, T.

    2015-12-01

    The world is rapidly running out of IPv4 addresses; the number of IPv6 end systems connected to the internet is increasing; WLCG and the LHC experiments may soon have access to worker nodes and/or virtual machines (VMs) possessing only an IPv6 routable address. The HEPiX IPv6 Working Group has been investigating, testing and planning for dual-stack services on WLCG for several years. Following feedback from our working group, many of the storage technologies in use on WLCG have recently been made IPv6-capable. This paper presents the IPv6 requirements, tests and plans of the LHC experiments together with the tests performed on the group's IPv6 test-bed. This is primarily aimed at IPv6-only worker nodes or VMs accessing several different implementations of a global dual-stack federated storage service. Finally the plans for deployment of production dual-stack WLCG services are presented.

  13. How To Write a Manual.

    ERIC Educational Resources Information Center

    Slatkin, Elizabeth

    Intended as a series of hands-on, step-by-step lessons, this book presents instructions, checklists, exercises, and examples to guide people who work in business, industry, science or government through all phases of manual preparation from planning to research to writing, all the way to getting the final piece printed. The first chapter shows how…

  14. 75 FR 30426 - Notice of Availability of Record of Decision for the Kemmerer Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... comment on expanded sage- grouse restrictions in the Proposed RMP/Final EIS. To resolve the issues raised in these protests, the Approved RMP adopts the sage- grouse restrictions originally presented in the..., Rock Springs, Newcastle, and Rawlins RMPs. These RMP amendments will revise sage-grouse and sagebrush...

  15. A Game Plan for Teaching Logic.

    ERIC Educational Resources Information Center

    Woloshin, Phyllis Lerman

    An experiment using game-theory to teach a unit on "fallacies" in logic was conducted at Oakton Community College. One experimental and two control group lecture-style classes were taught by three teachers using the same text and final test. The experimental class, after an introductory segment presented in lecture style, were involved in a…

  16. Location and Size Planning of Distributed Photovoltaic Generation in Distribution network System Based on K-means Clustering Analysis

    NASA Astrophysics Data System (ADS)

    Lu, Siqi; Wang, Xiaorong; Wu, Junyong

    2018-01-01

    The paper presents a method to generate the planning scenarios, which is based on K-means clustering analysis algorithm driven by data, for the location and size planning of distributed photovoltaic (PV) units in the network. Taken the power losses of the network, the installation and maintenance costs of distributed PV, the profit of distributed PV and the voltage offset as objectives and the locations and sizes of distributed PV as decision variables, Pareto optimal front is obtained through the self-adaptive genetic algorithm (GA) and solutions are ranked by a method called technique for order preference by similarity to an ideal solution (TOPSIS). Finally, select the planning schemes at the top of the ranking list based on different planning emphasis after the analysis in detail. The proposed method is applied to a 10-kV distribution network in Gansu Province, China and the results are discussed.

  17. 77 FR 34402 - Notice of Availability of the Final Land Use Analysis and Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... mining would occur directly beneath the lake itself and no surface mining would take place. East Lynn... Rockspring have approved mining and reclamation plans from the West Virginia Department of Environmental... plan purposes if leases were to be issued and mine plans approved. The Office of Surface Mining...

  18. Preservation Planning Program. Study Report. Iowa State University Library. Final Report.

    ERIC Educational Resources Information Center

    Galejs, John; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Iowa State University, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing plans and procedures for preserving…

  19. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  20. 75 FR 36064 - Stellwagen Bank National Marine Sanctuary Final Revised Management Plan: Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... on the Web site: http://stellwagen.noaa.gov . For a hard copy or data CD of the plan contact the sanctuary office at the contact number identified below. DATES: The final revised management plan is available to the public on June 17, 2010. FOR FURTHER INFORMATION CONTACT: Anne Smrcina, Stellwagen Bank...

  1. 75 FR 18113 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... final operations plan, contract, and environmental assessment (EA), and the Final Regulatory Flexibility... fish in a given FY, it must submit an operations plan, sector contract, and EA to NMFS by September 1... National Environmental Policy Act (NEPA), an EA was prepared for each operations plan. All sector EAs are...

  2. Technical Evaluation Motor No. 10 (TEM-10)

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Technical Evaluation Motor No. 10 (TEM-10) was static fired on 27 Apr. 1993 at the Thiokol Corporation full-scale motor static test bay, T-24. This final test report documents the procedures, performance, and results of the static test firing of TEM-10. All observations, discussions, conclusions, and recommendations contained are final. Included is a presentation and discussion of TEM-10 performance, anomalies, and test results in concurrence with the objectives outlined in CTP-0110, Revision D, Space Shuttle Technical Evaluation Motor No. 10 (TEM-10) Static Fire Test Plan.

  3. Group health plans and health insurance issuers relating to coverage of preventive services under the Patient Protection and Affordable Care Act. Final rules.

    PubMed

    2012-02-15

    These regulations finalize, without change, interim final regulations authorizing the exemption of group health plans and group health insurance coverage sponsored by certain religious employers from having to cover certain preventive health services under provisions of the Patient Protection and Affordable Care Act.

  4. 77 FR 24980 - Final General Management Plan and Environmental Impact Statement for the South Unit of Badlands...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... the availability of the Final General Management Plan and Environmental Impact Statement (GMP/EIS) for the South Unit of Badlands National Park, South Dakota. DATES: The Final GMP/EIS will remain available... Register by the Environmental Protection Agency. ADDRESSES: Copies of the GMP/EIS are available by request...

  5. Four-phase or two-phase signal plan? A study on four-leg intersection by cellular automaton simulations

    NASA Astrophysics Data System (ADS)

    Jin, Cheng-Jie; Wang, Wei; Jiang, Rui

    2016-08-01

    The proper setting of traffic signals at signalized intersections is one of the most important tasks in traffic control and management. This paper has evaluated the four-phase traffic signal plans at a four-leg intersection via cellular automaton simulations. Each leg consists of three lanes, an exclusive left-turn lane, a through lane, and a through/right-turn lane. For a comparison, we also evaluate the two-phase signal plan. The diagram of the intersection states in the space of inflow rate versus turning ratio has been presented, which exhibits four regions: In region I/II/III, congestion will propagate upstream and laterally and result in queue spillover with both signal plans/two-phase signal plan/four-phase signal plan, respectively. Therefore, neither signal plan works in region I, and only the four-phase signal plan/two-phase signal plan works in region II/III. In region IV, both signal plans work, but two-phase signal plan performs better in terms of average delays of vehicles. Finally, we study the diagram of the intersection states and average delays in the asymmetrical configurations.

  6. Feasibility Study for Low Drag Acoustic Liners Final Report

    NASA Technical Reports Server (NTRS)

    Riedel, Brian; Wu, Jackie

    2017-01-01

    This report documents the design and structural analysis as a final deliverable for the Phase 1 contract activity. Also included is a community noise test plan, which is a key deliverable for Phase 2. Finally, a high-level estimate (Phase 3 deliverable) is provided for the work statement of Phases 2-4, which covers the build of two inlet test articles, planning and execution of a flight test with the test inlets, as well as data analysis and final documentation. The two test inlets will be compared to the production baseline inlet configuration. There is also a plan to test one of the inlets "hardwalled" using speed tape or some other similar tape to block the acoustic perforations.

  7. STS-3 Induced Environment Contamination Monitor (IECM): Quick-look report

    NASA Technical Reports Server (NTRS)

    Miller, E. R. (Editor); Fountain, J. A. (Editor)

    1982-01-01

    The STS-3/Induced Environment Contamination Monitor (IECM) mission is described. The IECM system performance is discussed, and IECM mission time events are briefly described. Quick look analyses are presented for each of the 10 instruments comprising the IECM on the flight of STS-3. Finally, a short summary is presented and plans are discussed for future IECM flights, and opportunities for direct mapping of Orbiter effluents using the Remote manipulator System.

  8. 76 FR 27086 - Final General Management Plan, Wilderness Management Plan, and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... transportation opportunities would be sought to encourage visitors to come to Sand, Basswood, and Oak islands... light stations would be restored or rehabilitated, similar to the Raspberry Island light station. The...

  9. Final Rule: Community Right-To-Know Reporting Requirements Federal Register Notice

    EPA Pesticide Factsheets

    Final reporting thresholds and threshold planning quantity (TPQ) for extremely hazardous substances (EHS) and non-EHS hazardous chemicals, required under Emergency Planning and Community Right-to-Know Act, Superfund Amendments and Reauthorization Act.

  10. Supporting evaluation for the proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwatermore » Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).« less

  11. [Final Resolutions Adopted by the Conference on Planning of Rural Areas in Europe, 7 October 1978].

    ERIC Educational Resources Information Center

    Council of Europe, Strasbourg (France).

    Two final resolutions were adopted by the Council of Europe at the October 1978 European Conference of Ministers Responsible for Regional Planning. Resolution 1 focused on guidelines for the planning of rural areas in Europe. Strategies and policies called for: a more balanced development which makes the living conditions of different regions as…

  12. 40 CFR 62.14535 - When must I comply with this subpart if I plan to continue operation of my CISWI unit?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule...) You must submit a waste management plan no later than April 5, 2004. (3) You must achieve final... complete retrofit construction of control devices, as specified in the final control plan, so that, if the...

  13. Realization of planning design of mechanical manufacturing system by Petri net simulation model

    NASA Astrophysics Data System (ADS)

    Wu, Yanfang; Wan, Xin; Shi, Weixiang

    1991-09-01

    Planning design is to work out a more overall long-term plan. In order to guarantee a mechanical manufacturing system (MMS) designed to obtain maximum economical benefit, it is necessary to carry out a reasonable planning design for the system. First, some principles on planning design for MMS are introduced. Problems of production scheduling and their decision rules for computer simulation are presented. Realizable method of each production scheduling decision rule in Petri net model is discussed. Second, the solution of conflict rules for conflict problems during running Petri net is given. Third, based on the Petri net model of MMS which includes part flow and tool flow, according to the principle of minimum event time advance, a computer dynamic simulation of the Petri net model, that is, a computer dynamic simulation of MMS, is realized. Finally, the simulation program is applied to a simulation exmple, so the scheme of a planning design for MMS can be evaluated effectively.

  14. Structural evaluation of a DTHR bundle divertor particle collector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Prevenslik, T.V.

    1980-09-01

    The purpose of this report is to present a structural evaluation of the current bundle divertor particle collector BDPC design under a peak heat flux in relation to criteria that protect against coolant leakage into the plasma over replacement schedules planned during DTHR operation. In addition, an assessment of the BDPC structural integrity at higher heat fluxes is presented. Further, recommendations for modifications in the current BDPC design that would improve design reliability to be considered in future design studies are described. Finally, experimental test programs directed to establishing materials data necessary in providing greater confidence in subsequent structural evaluationsmore » of BDPC designs in relation to coolant leakage over planned replacement schedules are identified.« less

  15. Medicaid program; correction and reduction plans for intermediate care facilities for the mentally retarded--HCFA. Final rule.

    PubMed

    1991-07-05

    This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.

  16. 2013 Nutrition Risk Research Plan Review Final Report. Research Plan Review for: The Risk Factor of Inadequate Nutrition

    NASA Technical Reports Server (NTRS)

    2014-01-01

    The 2013 Nutrition Risk Standing Review Panel (from here on referred to as the SRP) was impressed by the degree of progress the nutrition discipline has made with the research plan presented since the 2012 Nutrition Risk SRP WebEx/teleconference. The scientists and staff associated with the nutrition discipline have, in addition, continued their impressive publication track record. Specifically the SRP found that the novel and important progress in the ocular health research area (Gap N7.3) represents an important advance in understanding the etiology and potential countermeasures for this condition and thinks that the work will not only be valuable for vision, but may have implications for cardiovascular health, as well. The SRP also considered the bone countermeasure data presented a potentially valuable tool for investigating bone metabolism under the unique conditions of space travel, specifically the innovation of variable use of stable Ca isotopes for bone synthesis and equal contribution for bone to investigate bone metabolism, as well as, the impact of the advanced resistive exercise device (ARED) on body composition during spaceflight. Finally, the SRP considers the planned Integrated Nutrition task to be an important and necessary strategic part of the research plan. The SRP is concerned that the risks observed in previous research on Low Earth Orbit (LEO) may not capture all the risks of longer duration flight beyond LEO. In particular, the SRP believes that there may be a much greater likelihood of an intensified chronic inflammatory response compared to the very minimal evidence seen to date and that modest effects seen in LEO, such as the reduction in appetite, may not predict an absence in longer duration flight out of LEO. The added complications of longer duration flight, greater bio-behavioral stress, radiation exposure, poorer communication, and inability to respond to unforeseen exigencies may create different risks. Thus, preparation for potential anticipated problems on long duration missions should be considered now while countermeasures can be developed even in the absence of sure knowledge as to their likelihood. Overall, the SRP thinks that all the Gaps presently in the research plan are appropriate and relevant, but there are a few missing Gaps that will help expand the research plan.

  17. Career Plans of Final-Year South African Student Teachers: Migration to "Greener Pastures"?

    ERIC Educational Resources Information Center

    de Villiers, J. J. R.

    2017-01-01

    Teacher loss due to migration is a global phenomenon that impacts both developed and developing nations the world over. The aim of this study was to find out about the career plans of final-year South African student teachers. A group of final-year Bachelor of Education student teachers from a South African university responded to a questionnaire…

  18. Final Approval of Arizona Air Plan Revision; Stationary Sources; New Source Review; Ammonia

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning issuance of New Source Review (NSR) permits for stationary sources related to ammonia.

  19. 78 FR 760 - Notice of Availability of the Final General Management Plan/Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... document is available on the internet at the NPS Planning, Environment, and Public Comment Web site at http.../EIS assesses impacts to soil resources, water quality, soundscapes, vegetation and wildlife...

  20. Multimodal corridor and capacity analysis manual. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-12-31

    This report presents the results of research carried out under NCHRP Project 8-31, Long-Term Availability of Multimodal Corridor Capacity. The report is presented as a manual on multimodal corridor and capacity analysis. Because transportation-system and corridor capacity for freight and passengers is critical for meeting current and future transportation demand, this manual will provide much needed assistance to a wide range of practitioners, particularly those engaged in performance analysis, capacity management, needs studies, systems planning, and corridor development planning--including major investment studies. It provides information regarding capacity analysis approaches for highways, rail, pipelines, and waterways and presents available options formore » enhancing corridor capacity and performance through various strategies such as new capacity development, freeing up unused capacity, or control of travel demand. Evaluation methods for these options are included.« less

  1. Cost Study of Educational Media Systems and Their Equipment Components. Volume I, Guidelines for Determining Costs of Media Systems. Final Report.

    ERIC Educational Resources Information Center

    General Learning Corp., Washington, DC.

    Objective cost estimates for planning and operating systems should be made after an assessment of administrative factors (school environment) and instructional factors (learning objectives, type of presentation). Specification of appropriate sensory stimuli and the design of alternative systems also precede cost estimations for production,…

  2. The Celebration of Death: Two Folk Tales about DEath. Mini-Module.

    ERIC Educational Resources Information Center

    African-American Inst., New York, NY. School Services Div.

    This module contains two African folk tales about death, two descriptions of African funerals, a lesson plan with 11 questions exploring the finality of and customs surrounding death, and a bibliography of five books which deal with African religious beliefs. The folk tales present concepts of death and immortality of the soul. The descriptions of…

  3. Study for Identification of Beneficial Uses of Space (BUS). Volume 2: Technical report. Book 4: Development and business analysis of space processed surface acoustic wave devices

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Preliminary development plans, analysis of required R and D and production resources, the costs of such resources, and, finally, the potential profitability of a commercial space processing opportunity for the production of very high frequency surface acoustic wave devices are presented.

  4. Facility Planning for 21st Century. Technology, Industry, and Education.

    ERIC Educational Resources Information Center

    Hill, Franklin

    When the Orange County School Board (Orlando, Florida) decided to build a new high school, they recognized Central Florida's high technology emphasis as a special challenge. The new facility needed to meet present instructional demands while being flexible enough to incorporate 21st century technologies. The final result is a new $30 million high…

  5. Tools for Teaching Cognitive Psychology: Using Public Service Announcements for Education on Environmental Sustainability

    ERIC Educational Resources Information Center

    Hager, Lisa D.

    2011-01-01

    To understand the relevance of cognitive psychology, students in a cognitive psychology course were required to complete a detailed plan for a public service announcement focusing on environmental issues. The final exam was a Microsoft Office PowerPoint presentation incorporating at least eight concepts from the course. Students in the course…

  6. NASA Technology Area 1: Launch Propulsion Systems

    NASA Technical Reports Server (NTRS)

    McConnaughey, Paul; Femminineo, Mark; Koelfgen, Syri; Lepsch, Roger; Ryan, Richard M.; Taylor, Steven A.

    2011-01-01

    This slide presentation reviews the technology advancements plans for the NASA Technology Area 1, Launch Propulsion Systems Technology Area (LPSTA). The draft roadmap reviews various propulsion system technologies that will be developed during the next 25 + years. This roadmap will be reviewed by the National Research Council which will issue a final report, that will include findings and recommendations.

  7. The Nature-Computer Camp. Final Evaluation Report, 1982-1983. E.C.I.A. Chapter 2.

    ERIC Educational Resources Information Center

    District of Columbia Public Schools, Washington, DC. Div. of Quality Assurance.

    This report presents a description and evaluation of the Nature-Computer Camp (NCC), an environmental and computer science program designed for sixth grade students in the District of Columbia public schools. Among the major components of the program were: planning for administration of operating the camp and for instruction in environmental…

  8. The Nature-Computer Camp. Final Evaluation Report, 1984-1985. E.C.I.A. Chapter 2.

    ERIC Educational Resources Information Center

    District of Columbia Public Schools, Washington, DC. Div. of Quality Assurance.

    This report presents a description and evaluation of the Nature-Computer Camp (NCC), an environmental and computer science program designed for sixth grade students in the District of Columbia public schools. Inputs, processes and outcomes based on a Planning, Monitoring and Implementing (PMI) Evaluation Model are reviewed for each of the four…

  9. Nature-Computer Camp. Final Evaluation Report. E.C.I.A. Chapter 2.

    ERIC Educational Resources Information Center

    District of Columbia Public Schools, Washington, DC. Div. of Quality Assurance.

    This report presents a description and evaluation of the Nature-Computer Camp (NCC), an environmental and computer science program designed for sixth grade students in the District of Columbia public schools. Inputs, processes and outcomes based on a Planning, Monitoring and Implementing (PMI) Evaluation Model are reviewed for each of the four…

  10. Design of the Army Chargeback and Cost Accounting System. Study Recommendations Report (Final Design and Implementation Plan),

    DTIC Science & Technology

    1987-08-07

    0MB, and Congress. Vance recommands that the marketing strategy consist of meetings to attend, presentations to give, input to request, briefings to...6.2.3.1.6 Blue Ribbon Panel. Vance recommends that as part of the marketing strategy , the Army convene a panel of senior corporate officials and

  11. Evaluation of the CAPE and CORE Programs for Sensory-Impaired Multi-Handicapped Children in the Province of Alberta. Final Report.

    ERIC Educational Resources Information Center

    Rutland Consulting Group Ltd.

    The report presents summaries of evaluations of the Coordinated Assessment and Program Planning for Education (CAPE) Program and the Coordinated Rehabilitation and Education (CORE) program for multi-handicapped sensory impaired and/or communication and behavior disordered children and their families in Alberta, Canada. Each program is evaluated…

  12. President's Task Force on Communications Policy. Staff Paper Five. Part II.

    ERIC Educational Resources Information Center

    President's Task Force on Communications Policy, Washington, DC.

    The second part of a staff paper to the President's Task Force on Communications Policy dealing with the domestic telecommunications carrier industry consists of the final two appendices. In the first, the history, structure, present services, and future plans of the Western Union Telegraph Company are discussed. Evidence is given that by allowing…

  13. Langley Research Center Strategic Plan for Education

    NASA Technical Reports Server (NTRS)

    Proctor, Sandra B.

    1994-01-01

    Research assignment centered on the preparation of final draft of the NASA Langley Strategic Plan for Education. Primary research activity consisted of data collection, through interviews with LaRC Office of Education and NASA Headquarters staff, university administrators and faculty, and school administrators / teachers; and documentary analysis. Pre-college and university programs were critically reviewed to assure effectiveness, support of NASA and Langley's mission and goals; National Education Goals; and educational reform strategies. In addition to these mandates, pre-college programs were reviewed to address present and future LaRC activities for teacher enhancement and preparation. University programs were reviewed with emphasis on student support and recruitment; faculty development and enhancement; and LaRC's role in promoting the utilization of educational technologies and distance learning. The LaRC Strategic Plan for Education will enable the Office of Education to provide a focused and well planned continuum of education programs for students, teachers and faculty. It will serve to direct and focus present activities and programs while simultaneously offering the flexibility to address new and emerging directions based on changing national, state, and agency trends.

  14. Mission Operations Planning with Preferences: An Empirical Study

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Khatib, Lina; McGann, Conor

    2006-01-01

    This paper presents an empirical study of some nonexhaustive approaches to optimizing preferences within the context of constraint-based, mixed-initiative planning for mission operations. This work is motivated by the experience of deploying and operating the MAPGEN (Mixed-initiative Activity Plan GENerator) system for the Mars Exploration Rover Mission. Responsiveness to the user is one of the important requirements for MAPGEN, hence, the additional computation time needed to optimize preferences must be kept within reasonabble bounds. This was the primary motivation for studying non-exhaustive optimization approaches. The specific goals of rhe empirical study are to assess the impact on solution quality of two greedy heuristics used in MAPGEN and to assess the improvement gained by applying a linear programming optimization technique to the final solution.

  15. Enriching mission planning approach with state transition graph heuristics for deep space exploration

    NASA Astrophysics Data System (ADS)

    Jin, Hao; Xu, Rui; Xu, Wenming; Cui, Pingyuan; Zhu, Shengying

    2017-10-01

    As to support the mission of Mars exploration in China, automated mission planning is required to enhance security and robustness of deep space probe. Deep space mission planning requires modeling of complex operations constraints and focus on the temporal state transitions of involved subsystems. Also, state transitions are ubiquitous in physical systems, but have been elusive for knowledge description. We introduce a modeling approach to cope with these difficulties that takes state transitions into consideration. The key technique we build on is the notion of extended states and state transition graphs. Furthermore, a heuristics that based on state transition graphs is proposed to avoid redundant work. Finally, we run comprehensive experiments on selected domains and our techniques present an excellent performance.

  16. Joint Planning and Development Office Work Plan FY10

    DTIC Science & Technology

    2010-01-01

    IPSA ) Division will make refinements to the NextGen Portfolio Analysis. In addition, IPSA will work with the Department of Defense (DoD) to define and...Submitted Interagency Portfolio and Systems Analysis ( IPSA ) DRAFT DoD Portfolio Analysis Criteria BASELINE DoD Portfolio Analysis Criteria DRAFT...WG Work Plan Review Prototype Capability Selected and Defined CHAs Complete Safety Metrics for IPSA Complete FINAL Prototype Report FINAL

  17. A Preservation Program for the Colorado State University Libraries. The Final Report of the ARL/OMS Preservation Planning Program.

    ERIC Educational Resources Information Center

    Green, Stephen; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Colorado State University Library (CSUL) working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). Designed to put self-help tools into the hands of library staff responsible for developing plans and procedures…

  18. Dose as a Tool for Planning and Implementing Community-Based Health Strategies.

    PubMed

    Kuo, Elena S; Harner, Lisa T; Frost, Madeline C; Cheadle, Allen; Schwartz, Pamela M

    2018-05-01

    A major challenge in community-based health promotion is implementing strategies that could realistically improve health at the population level. Population dose methodology was developed to help understand the combined impact of multiple strategies on population-level health behaviors. This paper describes one potential use of dose: as a tool for working collaboratively with communities to increase impact when planning and implementing community-level initiatives. Findings are presented from interviews conducted with 11 coordinators who used dose for planning and implementing local efforts with community coalitions. During early-stage planning, dose was used as a tool for strategic planning, and as a framework to build consensus among coalition partners. During implementation, a dose lens was used to revise strategies to increase their reach (the number of people exposed to the intervention) or strength (the relative change in behavior for each exposed person) to create population-level impact. A case study is presented, illustrating how some community coalitions and evaluators currently integrate dose into the planning and implementation of place-based healthy eating and active living strategies. Finally, a planning checklist was developed for program coordinators and evaluators. This article is part of a supplement entitled Building Thriving Communities Through Comprehensive Community Health Initiatives, which is sponsored by Kaiser Permanente, Community Health. Copyright © 2018 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  19. TVA's photovoltaic activities

    NASA Astrophysics Data System (ADS)

    Chinery, G. T.; Wood, J. M.

    1985-08-01

    This paper describes the Tennessee Valley Authority's (TVA) current photovoltaic (PV) activities. These include four roof-mounted 4 kWp residential arrays (which are also Southeast Residential Station field sites) and two 5-6 kWp commercial sites, all grid connected with no battery storage. Also included are approximately 30 kWp of non-grid-connected remote sites with storage (remote lighting, weather stations, etc.). Monitoring results from the two 'online' residential systems are presented. Finally, TVA's future PV plans are discussed, both with respect to interfacing with a multitude of residential and commercial cogenerators and with regard to possible TVA PV central station plans.

  20. Custom-made prefabricated titanium miniplates in Le Fort I osteotomies: principles, procedure and clinical insights.

    PubMed

    Philippe, B

    2013-08-01

    This paper describes a new type of miniplate system that is designed and custom made during virtual surgery planning based on an individual patient's osteotomy. These miniplates are prefabricated with commercially pure porous titanium using direct metal laser sintering. The principles that guide the conception and production of this new miniplate are presented. The surgical procedure from the stage of virtual surgery planning until the final Le Fort I osteotomy and bone fixation are described using a case example. Copyright © 2013 International Association of Oral and Maxillofacial Surgeons. Published by Elsevier Ltd. All rights reserved.

  1. Envisioning Cognitive Robots for Future Space Exploration

    NASA Technical Reports Server (NTRS)

    Huntsberger, Terry; Stoica, Adrian

    2010-01-01

    Cognitive robots in the context of space exploration are envisioned with advanced capabilities of model building, continuous planning/re-planning, self-diagnosis, as well as the ability to exhibit a level of 'understanding' of new situations. An overview of some JPL components (e.g. CASPER, CAMPOUT) and a description of the architecture CARACaS (Control Architecture for Robotic Agent Command and Sensing) that combines these in the context of a cognitive robotic system operating in a various scenarios are presented. Finally, two examples of typical scenarios of a multi-robot construction mission and a human-robot mission, involving direct collaboration with humans is given.

  2. Apollo experience report: Very high frequency ranging system

    NASA Technical Reports Server (NTRS)

    Panter, W. C.; Shores, P. W.

    1972-01-01

    The history of the Apollo very-high-frequency ranging system development program is presented from the program-planning stage through the final-test and flight-evaluation stages. Block diagrams of the equipment are presented, and a description of the theory of operation is outlined. A sample of the distribution of errors measured in the aircraft-flight test program is included. The report is concluded with guidelines or recommendations for the management of development programs having the same general constraints.

  3. Extending ACTS Operations Through a University-Based Consortium

    NASA Technical Reports Server (NTRS)

    Bauer, Robert; Krawcyzk, Richard; Irwin, Dennis; Kruse, Hans

    2001-01-01

    The Advanced Communications Technology Satellite (ACTS) program was slated for decommissioning in October 2000 as was announced at the 6th Ka-band Utilization Conference in May 2000. Quite a celebration was had at that event too centering on the decommissioning of this very successful technology program. With plans in place to move the spacecraft to an orbital graveyard and then shut the system down, NASA was challenged to consider the feasibility of extending operations for education and research purposes provided that an academic organization would be willing to cover operations costs. Continuing operations of the system was determined viable and in the fall of 2000, an announcement was made by NASA to consider extending operations. Plans are now in place to continue the operations of ACTS through a university-based consortium led by Ohio University, Athens, Ohio. Initial plans are for two more years of operations, with options to extend up to a total of four years. This paper will present the change in plans to continue operations of ACTS. A description of the multi-month transition of the spacecraft to its new and final orbital location is provided. With the spacecraft at this new location, an update on its performance is presented as well as estimates of long-term performance. The consortium development will be presented along with its organization, membership, and operations plans for using ACTS.

  4. A new methodology for inter- and intrafraction plan adaptation for the MR-linac

    NASA Astrophysics Data System (ADS)

    Kontaxis, C.; Bol, G. H.; Lagendijk, J. J. W.; Raaymakers, B. W.

    2015-10-01

    The new era of hybrid MRI and linear accelerator machines, including the MR-linac currently being installed in the University Medical Center Utrecht (Utrecht, The Netherlands), will be able to provide the actual anatomy and real-time anatomy changes of the patient’s target(s) and organ(s) at risk (OARs) during radiation delivery. In order to be able to take advantage of this input, a new generation of treatment planning systems is needed, that will allow plan adaptation to the latest anatomy state in an online regime. In this paper, we present a treatment planning algorithm for intensity-modulated radiotherapy (IMRT), which is able to compensate for patient anatomy changes. The system consists of an iterative sequencing loop open to anatomy updates and an inter- and intrafraction adaptation scheme that enables convergence to the ideal dose distribution without the need of a final segment weight optimization (SWO). The ability of the system to take into account organ motion and adapt the plan to the latest anatomy state is illustrated using artificial baseline shifts created for three different kidney cases. Firstly, for two kidney cases of different target volumes, we show that the system can account for intrafraction motion, delivering the intended dose to the target with minimal dose deposition to the surroundings compared to conventional plans. Secondly, for a third kidney case we show that our algorithm combined with the interfraction scheme can be used to deliver the prescribed dose while adapting to the changing anatomy during multi-fraction treatments without performing a final SWO.

  5. Moving survivorship care plans forward: focus on care coordination.

    PubMed

    Salz, Talya; Baxi, Shrujal

    2016-07-01

    After completing treatment for cancer, the coordination of oncology and primary care presents a challenge for cancer survivors. Many survivors need continued oncology follow-up, and all survivors require primary care. Coordinating the shared care of a cancer survivor, or facilitating an informed handoff from oncology to primary care, is essential for cancer survivors. Survivorship care plans are personalized documents that summarize cancer treatment and outline a plan of recommended ongoing care, with the goal of facilitating the coordination of post-treatment care. Despite their face validity, five trials have failed to demonstrate the effectiveness of survivorship care plans. We posit that these existing trials have critical shortcomings and do not adequately address whether survivorship care plans improve care coordination. Moving forward, we propose four criteria for future trials of survivorship care plans: focusing on high-needs survivor populations, tailoring the survivorship care plan to the care setting, facilitating implementation of the survivorship care plan in clinical practice, and selecting appropriate trial outcomes to assess care coordination. When trials meet these criteria, we can finally assess whether survivorship care plans help cancer survivors receive optimal oncology and primary care. © 2016 The Authors. Cancer Medicine published by John Wiley & Sons Ltd.

  6. 75 FR 4417 - Wind Cave National Park, Custer County, SD

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... DEPARTMENT OF THE INTERIOR Wind Cave National Park, Custer County, SD AGENCY: National Park... Final Environmental Impact Statement, Wind Cave National Park, Custer County, South Dakota. SUMMARY... Management Plan and Final Environmental Impact Statement (Plan), Wind Cave National Park, Custer County...

  7. Hazardous material transportation safety and security field operational test final detailed test plans : executive summary

    DOT National Transportation Integrated Search

    2003-09-16

    The objective of this Hazardous Material (HazMat) Transportation Safety and Security Field Operational Test (FOT) Final Detailed Test Plans evaluation is to measure the impact of technology solutions on the safety, security, and operational efficienc...

  8. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ...This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  9. Long-Range Strategic Planning for Libraries & Information Resources in the Research University. The Final Report on a Research Program on the Future of the Academic Research Library.

    ERIC Educational Resources Information Center

    California Univ., Los Angeles. Graduate School of Library and Information Science.

    This final report on a project at the University of California at Los Angeles (UCLA) on strategic planning for libraries and information resources in the research university begins with an introductory section on levels of consideration in planning; issues of current concern (effects of technology, economics of libraries, changes in the academic…

  10. Hawaii State Plan for Occupational Safety and Health. Final rule.

    PubMed

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  11. Medicare program; revisions to the Medicare Advantage and Part D prescription drug contract determinations, appeals, and intermediate sanctions processes. Final rule with comment period.

    PubMed

    2007-12-05

    This rule with comment period finalizes the Medicare program provisions relating to contract determinations involving Medicare Advantage (MA) organizations and Medicare Part D prescription drug plan sponsors, including eliminating the reconsideration process for review of contract determinations, revising the provisions related to appeals of contract determinations, and clarifying the process for MA organizations and Part D plan sponsors to complete corrective action plans. In this final rule with comment period, we also clarify the intermediate sanction and civil money penalty (CMP) provisions that apply to MA organizations and Medicare Part D prescription drug plan sponsors, modify elements of their compliance plans, retain voluntary self-reporting for Part D sponsors and implement a voluntary self-reporting recommendation for MA organizations, and revise provisions to ensure HHS has access to the books and records of MA organizations and Part D plan sponsors' first tier, downstream, and related entities. Although we have decided not to finalize the mandatory self-reporting provisions that we proposed, CMS remains committed to adopting a mandatory self-reporting requirement. To that end, we are requesting comments that will assist CMS in crafting a future proposed regulation for a mandatory self-reporting requirement.

  12. Effects of Individual Differences in Working Memory on Plan Presentational Choices

    PubMed Central

    Tintarev, Nava; Masthoff, Judith

    2016-01-01

    This paper addresses research questions that are central to the area of visualization interfaces for decision support: (RQ1) whether individual user differences in working memory should be considered when choosing how to present visualizations; (RQ2) how to present the visualization to support effective decision making and processing; and (RQ3) how to evaluate the effectiveness of presentational choices. These questions are addressed in the context of presenting plans, or sequences of actions, to users. The experiments are conducted in several domains, and the findings are relevant to applications such as semi-autonomous systems in logistics. That is, scenarios that require the attention of humans who are likely to be interrupted, and require good performance but are not time critical. Following a literature review of different types of individual differences in users that have been found to affect the effectiveness of presentational choices, we consider specifically the influence of individuals' working memory (RQ1). The review also considers metrics used to evaluate presentational choices, and types of presentational choices considered. As for presentational choices (RQ2), we consider a number of variants including interactivity, aggregation, layout, and emphasis. Finally, to evaluate the effectiveness of plan presentational choices (RQ3) we adopt a layered-evaluation approach and measure performance in a dual task paradigm, involving both task interleaving and evaluation of situational awareness. This novel methodology for evaluating visualizations is employed in a series of experiments investigating presentational choices for a plan. A key finding is that emphasizing steps (by highlighting borders) can improve effectiveness on a primary task, but only when controlling for individual variation in working memory. PMID:27899905

  13. Effects of Individual Differences in Working Memory on Plan Presentational Choices.

    PubMed

    Tintarev, Nava; Masthoff, Judith

    2016-01-01

    This paper addresses research questions that are central to the area of visualization interfaces for decision support: (RQ1) whether individual user differences in working memory should be considered when choosing how to present visualizations; (RQ2) how to present the visualization to support effective decision making and processing; and (RQ3) how to evaluate the effectiveness of presentational choices. These questions are addressed in the context of presenting plans, or sequences of actions, to users. The experiments are conducted in several domains, and the findings are relevant to applications such as semi-autonomous systems in logistics. That is, scenarios that require the attention of humans who are likely to be interrupted, and require good performance but are not time critical. Following a literature review of different types of individual differences in users that have been found to affect the effectiveness of presentational choices, we consider specifically the influence of individuals' working memory (RQ1). The review also considers metrics used to evaluate presentational choices, and types of presentational choices considered. As for presentational choices (RQ2), we consider a number of variants including interactivity, aggregation, layout, and emphasis. Finally, to evaluate the effectiveness of plan presentational choices (RQ3) we adopt a layered-evaluation approach and measure performance in a dual task paradigm, involving both task interleaving and evaluation of situational awareness. This novel methodology for evaluating visualizations is employed in a series of experiments investigating presentational choices for a plan. A key finding is that emphasizing steps (by highlighting borders) can improve effectiveness on a primary task, but only when controlling for individual variation in working memory.

  14. Earth observing system. Output data products and input requirements, version 2.0. Volume 3: Algorithm summary tables and non-EOS data products

    NASA Technical Reports Server (NTRS)

    Lu, Yun-Chi; Chang, Hyo Duck; Krupp, Brian; Kumar, Ravindar; Swaroop, Anand

    1992-01-01

    Volume 3 assists Earth Observing System (EOS) investigators in locating required non-EOS data products by identifying their non-EOS input requirements and providing the information on data sets available at various Distributed Active Archive Centers (DAAC's), including those from Pathfinder Activities and Earth Probes. Volume 3 is intended to complement, not to duplicate, the the EOSDIS Science Data Plan (SDP) by providing detailed data set information which was not presented in the SDP. Section 9 of this volume discusses the algorithm summary tables containing information on retrieval algorithms, expected outputs and required input data. Section 10 describes the non-EOS input requirements of instrument teams and IDS investigators. Also described are the current and future data holdings of the original seven DAACS and data products planned from the future missions and projects including Earth Probes and Pathfinder Activities. Section 11 describes source of information used in compiling data set information presented in this volume. A list of data set attributes used to describe various data sets is presented in section 12 along with their descriptions. Finally, Section 13 presents the SPSO's future plan to improve this report .

  15. Transportation planning performance measures : final report.

    DOT National Transportation Integrated Search

    2005-10-01

    Oregon transportation plans, including the statewide Oregon Transportation Plan, and current regional transportation plans for the Portland, Salem, Eugene, and Medford metropolitan areas, contain some policy areas that are not adequately addressed by...

  16. 76 FR 76180 - Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Suisun Marsh...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ...) Federal joint lead agencies, and the State of California Department of Fish and Game (DFG), acting as the..., Preservation, and Restoration Plan (SMP) Final EIS/EIR. The SMP is a comprehensive plan designed to address the...

  17. Final Approval of Arizona Air Plan Revision; Lead-bearing Fugitive Dust Associated With Hayden, AZ Copper Smelter

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning emissions of lead-bearing fugitive dust associated with the primary copper smelter located in Hayden, Arizona.

  18. 77 FR 38801 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Resource Management (VRM) Plan, Amendment, Class Designation, Carbon County, WY, Review Period Ends: 07/30... Final Vehicle Management Plan, Implementation, Denali National Park and Preserve, AK, Review Period Ends.... EIS No. 20120199, Final EIS, RUS, MS, ADOPTION--Kemper County Integrated Gasification Combined Cycle...

  19. Considering high occupancy vehicle alternatives in the urban transportation planning process: energy savings. Final report, August 1981-October 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford, M.J.; Wickstrom, G.V.

    1983-10-01

    Preferred treatment of high occupancy vehicles (HOV's), through strategies such as dedicated lanes, can achieve transportation energy conservation. The research presented in this report provides a method for regional planning agencies to assess such HOV facilities, from a travel demand and energy consumption standpoint. The planning process is described and applied in a case study. Products of the case study included estimates of carpool formation and associated fuel savings, and traffic operations on HOV and other facilities in the corridor. The completed process represents a method to examine HOV's under a variety of policy and operational conditions. The process ismore » within the modeling capabilities of other Metropolitan Planning Organizations (MPO's) and should be transferable to other cities and corridors. Additional applications of the HOV estimation and evaluation process are recommended.« less

  20. Motion planning: A journey of robots, molecules, digital actors, and other artifacts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Latombe, J.C.

    1999-11-01

    During the past three decades, motion planning has emerged as a crucial and productive research area in robotics. In the mid-1980s, the most advanced planners were barely able to compute collision-free paths for objects crawling in planar workspaces. Today, planners efficiently deal with robots with many degrees of freedom in complex environments. Techniques also exist to generate quasi-optimal trajectories, coordinate multiple robots, deal with dynamic and kinematic constraints, and handle dynamic environments. This paper describes some of these achievements, presents new problems that have recently emerged, discusses applications likely to motivate future research, and finally gives expectations for the comingmore » years. It stresses the fact that nonrobotics applications (e.g., graphic animation, surgical planning, computational biology) are growing in importance and are likely to shape future motion-planning research more than robotics itself.« less

  1. Current Status and Future Plans of the NEON Airborne Observation Platform (AOP): Data Products, Observatory Requirements and Opportunities for the Community

    NASA Astrophysics Data System (ADS)

    Petroy, S. B.; Leisso, N.; Goulden, T.; Gulbransen, T.

    2016-12-01

    The National Ecological Observatory Network (NEON) is a continental-scale ecological observation platform designed to collect and disseminate data that contributes to understanding and forecasting the impacts of climate change, land use change, and invasive species on ecology. NEON will collect in-situ and airborne data over 81 sites across the US, including Alaska, Hawaii, and Puerto Rico. The Airborne Observation Platform (AOP) group within the NEON project operates a payload suite that includes a waveform LiDAR, imaging spectrometer (NIS) and high resolution RGB camera. Data from this sensor suite will be collected annually over each site and processed into a set of standard data products, generally following the processing levels used by NASA (Level 1 through Level 3). We will present a summary of the first operational flight campaign (2016), where AOP flew 42 of the 81 planned NEON sites, our operational plans for 2017, and how we will ramp up to full operations by 2018. We will also describe the final set of AOP data products to be delivered as part of NEON construction and those field (observational) data products collected concurrently on the ground, that may be used to support validation efforts of algorithms for deriving vegetation characteristics from airborne data (e.g. Plant foliar physical/chemical properties, Digital Hemispherical Photos, Plant Diversity, etc.). Opportunities for future enhancements to data products or algorithms will be facilitated via NEON's cyberinfrastructure, which is designed to support wrapping/integration of externally-developed code. And finally, we will present NEON's plans for the third AOP Sensor Suite as an assignable asset and the intent of NSF to provide research opportunities to the community for developing higher level AOP data products that were removed from the NEON project in 2015.

  2. Vulnerability-based evaluation of water supply design under climate change

    NASA Astrophysics Data System (ADS)

    Umit Taner, Mehmet; Ray, Patrick; Brown, Casey

    2015-04-01

    Long-lived water supply infrastructures are strategic investments in the developing world, serving the purpose of balancing water deficits compounded by both population growth and socio-economic development. Robust infrastructure design under climate change is compelling, and often addressed by focusing on the outcomes of climate model projections ('scenario-led' planning), or by identifying design options that are less vulnerable to a wide range of plausible futures ('vulnerability-based' planning). Decision-Scaling framework combines these two approaches by first applying a climate stress test on the system to explore vulnerabilities across many traces of the future, and then employing climate projections to inform the decision-making process. In this work, we develop decision scaling's nascent risk management concepts further, directing actions on vulnerabilities identified during the climate stress test. In the process, we present a new way to inform climate vulnerability space using climate projections, and demonstrate the use of multiple decision criteria to guide to a final design recommendation. The concepts are demonstrated for a water supply project in the Mombasa Province of Kenya, planned to provide domestic and irrigation supply. Six storage design capacities (from 40 to 140 million cubic meters) are explored through a stress test, under a large number climate traces representing both natural climate variability and plausible climate changes. Design outcomes are simulated over a 40-year planning period with a coupled hydrologic-water resources systems model and using standard reservoir operation rules. Resulting performance is expressed in terms of water supply reliability and economic efficiency. Ensemble climate projections are used for assigning conditional likelihoods to the climate traces using a statistical distance measure. The final design recommendations are presented and discussed for the decision criteria of expected regret, satisficing, and conditional value-at-risk (CVaR).

  3. Reproducing Advantage: The Perspective of English School Leavers on Studying Abroad

    ERIC Educational Resources Information Center

    King, Russell; Findlay, Allan; Ahrens, Jill; Dunne, Mairead

    2011-01-01

    This paper presents results of a questionnaire survey of 1400 Year 13 (final-year) school and sixth-form pupils in two contrasting areas of England, which asked them about their thoughts and plans to study at university abroad. Key questions that the survey sought to answer were the following. How many and what proportion of all higher education…

  4. 76 FR 45667 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program; Amendment of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-01

    ... effective date because ``many employers already may have planned for their labor needs and operations for... operations, the Department is delaying implementation of this Final Rule so that the prevailing wage... seeking to hire H-2B workers for its restaurant could be presented with SCA wage rates for a ``Cook I...

  5. One-Week Pre-Service Workshop for Newly Hired VTAE Teachers. Final Report. Project No. 30-106-150-319.

    ERIC Educational Resources Information Center

    Peter, Richard; Gebhart, Richard

    Many new vocational, technical, and adult education (VTAE) teachers have never taught before and perhaps have never taken a professional education course. The Wisconsin Board of VTAE has developed a spiral curriculum for new VTAE teachers, designed to aquaint them with basic procedures for planning and presenting a lesson, supervising student…

  6. Laying the Groundwork for an Interdisciplinary Effort Aimed at Prevention of Pregnancy among Middle School Students. Final Report, from July 1978 to June 1979.

    ERIC Educational Resources Information Center

    Morse, Betty R.; And Others

    This report presents results of a project to provide useful information for planning pregnancy prevention programs. It focuses on five project objectives: (1) identification of factors associated with adolescent sexual behavior, contraceptive behavior, and pregnancy; (2) development of instructional objectives or skills associated with pregnancy…

  7. Utah Teacher Evaluation Project: The Park City Career Ladder Design. Final Report: Secretary's Discretionary Program, Planning Grant to Develop Teacher Incentive Programs.

    ERIC Educational Resources Information Center

    Peterson, Ken; And Others

    The Park City School District (Utah) career ladder design provides a system in which teachers are positioned and paid according to successful performance and differentiation of responsibilities. It includes an evaluation system to differentiate among teachers. The career ladder design presents a number of innovations; for example, excellent…

  8. Wisconsin Elementary Teacher Education Project. Volume VI, Feasibility Study: Pricing and Economic Analysis Study. Final Report.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison.

    This document is the second volume of the feasibility study report for the Wisconsin Elementary Teacher Education Project. It provides in part 1 data on program, planning and budgeting, including cost figures for preparing students in the present and new programs, marginal expenses, and costs for implementing the program on other campuses. Part 2…

  9. Highly Efficient Training, Refinement, and Validation of a Knowledge-based Planning Quality-Control System for Radiation Therapy Clinical Trials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Nan; Carmona, Ruben; Sirak, Igor

    Purpose: To demonstrate an efficient method for training and validation of a knowledge-based planning (KBP) system as a radiation therapy clinical trial plan quality-control system. Methods and Materials: We analyzed 86 patients with stage IB through IVA cervical cancer treated with intensity modulated radiation therapy at 2 institutions according to the standards of the INTERTECC (International Evaluation of Radiotherapy Technology Effectiveness in Cervical Cancer, National Clinical Trials Network identifier: 01554397) protocol. The protocol used a planning target volume and 2 primary organs at risk: pelvic bone marrow (PBM) and bowel. Secondary organs at risk were rectum and bladder. Initial unfiltered dose-volumemore » histogram (DVH) estimation models were trained using all 86 plans. Refined training sets were created by removing sub-optimal plans from the unfiltered sample, and DVH estimation models… and DVH estimation models were constructed by identifying 30 of 86 plans emphasizing PBM sparing (comparing protocol-specified dosimetric cutpoints V{sub 10} (percentage volume of PBM receiving at least 10 Gy dose) and V{sub 20} (percentage volume of PBM receiving at least 20 Gy dose) with unfiltered predictions) and another 30 of 86 plans emphasizing bowel sparing (comparing V{sub 40} (absolute volume of bowel receiving at least 40 Gy dose) and V{sub 45} (absolute volume of bowel receiving at least 45 Gy dose), 9 in common with the PBM set). To obtain deliverable KBP plans, refined models must inform patient-specific optimization objectives and/or priorities (an auto-planning “routine”). Four candidate routines emphasizing different tradeoffs were composed, and a script was developed to automatically re-plan multiple patients with each routine. After selection of the routine that best met protocol objectives in the 51-patient training sample (KBP{sub FINAL}), protocol-specific DVH metrics and normal tissue complication probability were compared for original versus KBP{sub FINAL} plans across the 35-patient validation set. Paired t tests were used to test differences between planning sets. Results: KBP{sub FINAL} plans outperformed manual planning across the validation set in all protocol-specific DVH cutpoints. The mean normal tissue complication probability for gastrointestinal toxicity was lower for KBP{sub FINAL} versus validation-set plans (48.7% vs 53.8%, P<.001). Similarly, the estimated mean white blood cell count nadir was higher (2.77 vs 2.49 k/mL, P<.001) with KBP{sub FINAL} plans, indicating lowered probability of hematologic toxicity. Conclusions: This work demonstrates that a KBP system can be efficiently trained and refined for use in radiation therapy clinical trials with minimal effort. This patient-specific plan quality control resulted in improvements on protocol-specific dosimetric endpoints.« less

  10. Robust mobility in human-populated environments

    NASA Astrophysics Data System (ADS)

    Gonzalez, Juan Pablo; Phillips, Mike; Neuman, Brad; Likhachev, Max

    2012-06-01

    Creating robots that can help humans in a variety of tasks requires robust mobility and the ability to safely navigate among moving obstacles. This paper presents an overview of recent research in the Robotics Collaborative Technology Alliance (RCTA) that addresses many of the core requirements for robust mobility in human-populated environments. Safe Interval Path Planning (SIPP) allows for very fast planning in dynamic environments when planning timeminimal trajectories. Generalized Safe Interval Path Planning extends this concept to trajectories that minimize arbitrary cost functions. Finally, generalized PPCP algorithm is used to generate plans that reason about the uncertainty in the predicted trajectories of moving obstacles and try to actively disambiguate the intentions of humans whenever necessary. We show how these approaches consider moving obstacles and temporal constraints and produce high-fidelity paths. Experiments in simulated environments show the performance of the algorithms under different controlled conditions, and experiments on physical mobile robots interacting with humans show how the algorithms perform under the uncertainties of the real world.

  11. A robust multi-objective global supplier selection model under currency fluctuation and price discount

    NASA Astrophysics Data System (ADS)

    Zarindast, Atousa; Seyed Hosseini, Seyed Mohamad; Pishvaee, Mir Saman

    2017-06-01

    Robust supplier selection problem, in a scenario-based approach has been proposed, when the demand and exchange rates are subject to uncertainties. First, a deterministic multi-objective mixed integer linear programming is developed; then, the robust counterpart of the proposed mixed integer linear programming is presented using the recent extension in robust optimization theory. We discuss decision variables, respectively, by a two-stage stochastic planning model, a robust stochastic optimization planning model which integrates worst case scenario in modeling approach and finally by equivalent deterministic planning model. The experimental study is carried out to compare the performances of the three models. Robust model resulted in remarkable cost saving and it illustrated that to cope with such uncertainties, we should consider them in advance in our planning. In our case study different supplier were selected due to this uncertainties and since supplier selection is a strategic decision, it is crucial to consider these uncertainties in planning approach.

  12. Miami Valley ITS : early deployment plan : final user service plan

    DOT National Transportation Integrated Search

    1997-07-01

    This User Service Plan is the first major product of the process to develop an Intelligent Transportation System (ITS) Early Deployment Plan (EDP) for the Miami Valley. This User Service Plan documents the travel environment, growth trends and transp...

  13. California Air Quality State Implementation Plans; Final Approval; Butte County Air Quality Management District; Stationary Source Permits

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.

  14. 76 FR 50413 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  15. 78 FR 68739 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  16. 76 FR 8649 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  17. 77 FR 22215 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  18. 76 FR 27889 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  19. 76 FR 63836 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  20. 78 FR 11093 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  1. 76 FR 21252 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  2. 77 FR 41270 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  3. 76 FR 2578 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  4. 78 FR 62426 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  5. 77 FR 28477 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  6. 78 FR 42009 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  7. 78 FR 2881 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  8. 76 FR 70639 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  9. 75 FR 69588 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  10. 77 FR 68685 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  11. 76 FR 41689 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  12. 78 FR 28490 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  13. 77 FR 2015 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  14. 77 FR 8730 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  15. 78 FR 22192 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  16. 77 FR 62433 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  17. 75 FR 63380 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  18. Patient Protection and Affordable Care Act; third party payment of qualified health plan premiums. Interim final rule with comment period.

    PubMed

    2014-03-19

    This interim final rule requires issuers of qualified health plans (QHPs), including stand-alone dental plans (SADPs), to accept premium and cost-sharing payments made on behalf of enrollees by the Ryan White HIV/AIDS Program, other Federal and State government programs that provide premium and cost sharing support for specific individuals, and Indian tribes, tribal organizations, and urban Indian organizations.

  19. MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints

    DTIC Science & Technology

    2001-08-01

    progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New

  20. Task-Based Language Learning: Old Approach, New Style. A New Lesson to Learn (Aprendizaje basado en tareas: un antiguo enfoque, un nuevo estilo. Una nueva lección para aprender)

    ERIC Educational Resources Information Center

    Rodríguez-Bonces, Mónica; Rodríguez-Bonces, Jeisson

    2010-01-01

    This paper provides an overview of Task-Based Language Learning (TBL) and its use in the teaching and learning of foreign languages. It begins by defining the concept of TBL, followed by a presentation of its framework and implications, and finally, a lesson plan based on TBL. The article presents an additional stage to be considered when planning…

  1. 25 CFR 1000.20 - What is required in a planning report?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... planning phase, the Tribe/Consortium must prepare and submit to the Secretary a final planning report. (a... Tribe's/Consortium's planning efforts have revealed that its current organization is adequate to assume...

  2. The U.S. Federal Radionavigation Plan

    NASA Astrophysics Data System (ADS)

    Shirer, Heywood O.

    The author presents an overview of the 1990 Federal Radionavigation Plan (FRP) policy and a discussion of the status of GPS (Global Positioning System), Loran-C, Omega, VOR/DME (VHF omnidirectional range/distance measuring equipment), VORTAC, TACAN, MLS (Microwave Landing System), ILS (instrument landing systems), Transit, and radiobeacons. The 1990 FRP contains significant changes regarding several of the radionavigation systems. It is concluded that it is difficult at best to ascertain the post-GPS final systems mix of federally provided radionavigation systems. The phase-out dates of other systems in favor of GPS still remain soft. Many uncertainties remain until the capabilities of GPS are verified for all classes of users. The federal radionavigation planning process accommodates such uncertainties, keeping pace with the constantly changing radionavigation user profile and rapid advancements in system technology.

  3. Periodontics, Implantology, and Prosthodontics Integrated: The Zenith-Driven Rehabilitation

    PubMed Central

    Cabral, Guilherme

    2017-01-01

    A customized treatment plan is important to reach results that will satisfy the patient providing esthetics, function, and long-term stability. This type of oral rehabilitation requires professionals from different dental specialties where communication is a major key point. Digital Smile Design allows the practitioners to plan and discuss the patient's condition to establish the proper treatment plan, which must be driven by the desired zenith position. The ideal gingival position will guide the professionals and determine the need to perform surgical procedures or orthodontic movement before placing the final restorations. In this article, the zenith-driven concept is discussed and a challenging case is presented with 4-year follow-up where tooth extraction, immediate implant placement, bone regeneration, and a connective tissue graft were performed. PMID:28713600

  4. Investigation into avian mortality in the Playa Lakes region of southeastern New Mexico: Final Report - June 1997

    USGS Publications Warehouse

    Dein, F. Joshua; Baeten, Laurie A.; Moore, Melody K.; Samuel, Michael D.; Miller, Paul D.; Murphy, Christopher; Sissler, Steven; Jeske, Clinton W.; Jehl, Joseph R.; Yaeger, J. S.; Bauer, B.; Mahoney, Shiela A.

    1997-01-01

    This Final Report is a review of work on a cooperative study undertaken by the USGS Biological Resources Division's National Wildlife Health Center (NWHC) and National Wetlands Research Center (NWRC; formerly the Southern Science Center) from 1994 through 1997. The study was initiated at the request of the Bureau of Land Management (BLM), through a request to the former National Biological Service. The Southeastern New Mexico Playa Lakes Coordinating Committee (SENMPLCC) played an important role in outlining the research needs. The initial Study Plan document, which outlines the background, objectives and methods for the first two years is available as Appendix 1. A letter indicating modifications to the Study Plan was sent to the SENMPLCC chair on April 25,1995, and is Appendix 2. An Interim Report, covering this work was completed and submitted in September 1995. The Literature Review section of the study was completed and presented to SENMPLCC in August, 1995. Following SENMPLCC review, NWHC was asked to develop a series of questions that could be posed from information gained in the initial phase (Appendix 3). The NWHC and NWRC were then directed to begin work to answer the top three questions, within the available fiscal resources. NWRC could continue with work outlined under the original Study Plan (Appendix 1), however an additional Study Plan for experiments performed by NWHC and collaborators and is available as Appendix 4.

  5. Patient Protection and Affordable Care Act; Market Stabilization. Final rule.

    PubMed

    2017-04-18

    This rule finalizes changes that will help stabilize the individual and small group markets and affirm the traditional role of State regulators. This final rule amends standards relating to special enrollment periods, guaranteed availability, and the timing of the annual open enrollment period in the individual market for the 2018 plan year; standards related to network adequacy and essential community providers for qualified health plans; and the rules around actuarial value requirements.

  6. 77 FR 60137 - Lee Metcalf National Wildlife Refuge, Ravalli County, MT; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    .... The final plan identifies goals, objectives, and strategies that describe the future management of the... management purpose, for migratory birds'' (Migratory Bird Conservation Act); and (2) ``for (a) incidental... participate in interpretive programs in the indoor and outdoor classrooms. The Refuge provides habitat for...

  7. 77 FR 24403 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    .../Infectious Waste Incinerators'' (HMIWI). The Illinois Environmental Protection Agency (IEPA) submitted the... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2012-0087; FRL-9663-4] Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated Facilities and...

  8. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  9. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  10. 76 FR 67369 - Revisions to the California State Implementation Plan, Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... the California State Implementation Plan, Joaquin Valley Unified Air Pollution Control District and Imperial County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution...

  11. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Management Plan and... Administration (NOAA), Department of Commerce (DOC). ACTION: Notice of public availability. SUMMARY: NOAA is... the wreck of the famed Civil War ironclad, USS Monitor, best known for its battle with the Confederate...

  12. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  13. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  14. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  15. Methane Hydrate Field Program: Development of a Scientific Plan for a Methane Hydrate-Focused Marine Drilling, Logging and Coring Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Myers, Greg

    This final report document summarizes the activities undertaken and the output from three primary deliverables generated during this project. This fifteen month effort comprised numerous key steps including the creation of an international methane hydrate science team, determining and reporting the current state of marine methane hydrate research, convening an international workshop to collect the ideas needed to write a comprehensive Marine Methane Hydrate Field Research Plan and the development and publication of that plan. The following documents represent the primary deliverables of this project and are discussed in summary level detail in this final report: Historical Methane Hydrate Projectmore » Review Report; Methane Hydrate Workshop Report; Topical Report: Marine Methane Hydrate Field Research Plan; and Final Scientific/Technical Report.« less

  16. Sensing systems efficiency evaluation and comparison for homeland security and homeland defense

    NASA Astrophysics Data System (ADS)

    Pakhomov, Alexander A.

    2010-04-01

    Designers and consumers of various security, intelligence, surveillance and reconnaissance (ISR) systems as well as various unattended ground sensors pay most attention to their commonly used performance characteristics such as probability of a target detection and probability of a false alarm. These characteristics are used for systems comparison and evaluation. However, it is not enough for end-users of these systems as well as for their total/final effectiveness assessment. This article presents and discusses a system approach to an efficiency estimation of the security and ISR systems. Presented approach aims at final result of the system's function and use. It allows setting up reasonable technical and structural requirements for the security and ISR systems, to make trustworthy comparison and practical application planning of such systems. It also allows finding forward-looking, perspective ways of systems development. Presented results can be guidance to both designers and consumers.

  17. Fourth Airborne Geoscience Workshop: Summary Minutes

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The general theme for the workshop revolved around global environmental change. Over 170 individuals participated in the presentations and ensuing discussions about the many agency activities using airborne platforms and sensors in support of the U.S. Global Change Research Program (GCRP). The U.S. GCRP was developed as a central component of the U.S. Government's approach to global change and its contribution to worldwide efforts. An all-encompassing U.S. plan was developed by the Committee on Earth and Environmental Sciences (CEES), which continues as the interagency coordinating group for the program. The U.S. GCRP was established as a Presidential initiative in the FY90 budget, making it a particularly relevant topic for the workshop. The following are presented in the appendices: (1) final agenda and list of registrants; (2) final list of poster presenters; (3) steering group luncheon participants; (4) the draft resolution; and (5) selected handouts.

  18. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  19. A 6-DOF parallel bone-grinding robot for cervical disc replacement surgery.

    PubMed

    Tian, Heqiang; Wang, Chenchen; Dang, Xiaoqing; Sun, Lining

    2017-12-01

    Artificial cervical disc replacement surgery has become an effective and main treatment method for cervical disease, which has become a more common and serious problem for people with sedentary work. To improve cervical disc replacement surgery significantly, a 6-DOF parallel bone-grinding robot is developed for cervical bone-grinding by image navigation and surgical plan. The bone-grinding robot including mechanical design and low level control is designed. The bone-grinding robot navigation is realized by optical positioning with spatial registration coordinate system defined. And a parametric robot bone-grinding plan and high level control have been developed for plane grinding for cervical top endplate and tail endplate grinding by a cylindrical grinding drill and spherical grinding for two articular surfaces of bones by a ball grinding drill. Finally, the surgical flow for a robot-assisted cervical disc replacement surgery procedure is present. The final experiments results verified the key technologies and performance of the robot-assisted surgery system concept excellently, which points out a promising clinical application with higher operability. Finally, study innovations, study limitations, and future works of this present study are discussed, and conclusions of this paper are also summarized further. This bone-grinding robot is still in the initial stage, and there are many problems to be solved from a clinical point of view. Moreover, the technique is promising and can give a good support for surgeons in future clinical work.

  20. Patient Protection and Affordable Care Act; health insurance market rules. Final rule.

    PubMed

    2013-02-27

    This final rule implements provisions related to fair health insurance premiums, guaranteed availability, guaranteed renewability, single risk pools, and catastrophic plans, consistent with title I of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010, referred to collectively as the Affordable Care Act. The final rule clarifies the approach used to enforce the applicable requirements of the Affordable Care Act with respect to health insurance issuers and group health plans that are non-federal governmental plans. This final rule also amends the standards for health insurance issuers and states regarding reporting, utilization, and collection of data under the federal rate review program, and revises the timeline for states to propose state-specific thresholds for review and approval by the Centers for Medicare & Medicaid Services (CMS).

  1. Wake-Sleep Cycle Management during SUSOPS and CONOPS in French Military Forces: Policy and Ethics

    DTIC Science & Technology

    2009-10-01

    sleepiness for 48 hours. Finally, Z- hypnotics are also allowed to promote pre- planned sleep episodes. Nevertheless, the use of these drugs acting on...Finally, Z- hypnotics are also allowed to promote pre- planned sleep episodes. Nevertheless, the use of these drugs acting on the central nervous system...why the individual test of tolerance, planned in the MD instruction, seems to be particularly important for modafinil before operational use. 3.2

  2. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  3. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  4. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) A cyber security plan in accordance with the criteria set forth in § 73.54 of this chapter; (iv) A... cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan, shall protect the plans and...

  5. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  6. Coordinated study of Solar-Terrestrial Observatory (STO) payloads on space station

    NASA Technical Reports Server (NTRS)

    Wu, S. T.

    1988-01-01

    Since the publication of the final report of the science study group in October 1984 on the Solar Terrestrial Observatory (STO), its science goals and objectives have been clearly defined and a conceptual design and analysis was carried out by MSFC/NASA. Plans for the possible placing of the STO aboard the Space Station were made. A series of meetings for the STO science study group were held to review the instruments to be placed on the initial STO at Space Station IOC, and the placement of these instruments on the manned space station, polar platform, and the co-orbiting platform. A summary of these initial STO instruments is presented in Section 2. A brief description of the initial plan for the placement of STO instruments is included in Section 3. Finally, in Section 4, the scenario for the operation of the STO is discussed. These results were obtained from the report of the Solar Terrestrial Observatory mini-workshop held at MSFC on 6 June 1985.

  7. Effects of planning strategies on writing dynamics and final texts.

    PubMed

    Limpo, Teresa; Alves, Rui A

    2018-06-12

    Expert writing involves the interaction among three cognitively demanding processes: planning, translating, and revising. To manage the cognitive load brought on by these processes, writers frequently use strategies. Here, we examined the effects of planning strategies on writing dynamics and final texts. Before writing an argumentative text with the triple-task technique, 63 undergraduates were asked either to elaborate an outline with the argumentative structure embedded (structure-based planning condition), to provide a written list of ideas for the text (list-based planning condition), or to do a non-writing-related filler task (no planning condition). Planning showed no effects on the length of the pre-writing pause and cognitive effort, but influenced writing processes occurrences. Compared to participants in the no-planning condition, those in the planning conditions showed a later activation of revising. Moreover, participants in the structure-based condition were mainly focused on translating in the beginning and middle of composition, whereas their peers tended to distribute their attention among all processes. Planning ahead of writing also resulted in texts with longer words, produced at a higher rate. Only the structure-based planning strategy led to an increase in the number of argumentation elements as well as in essays' persuasiveness and overall quality. There was, however, no indication that these improvements in final texts were associated with changes in the dynamics of writing. Overall, the use of structure-based plans seems to be an effective and efficient way of improving undergraduates' argumentative writing. Copyright © 2018 Elsevier B.V. All rights reserved.

  8. Minimum Value of Eligible Employer-Sponsored Plans and Other Rules Regarding the Health Insurance Premium Tax Credit. Final regulations.

    PubMed

    2015-12-18

    This document contains final regulations on the health insurance premium tax credit enacted by the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010, as amended by the Medicare and Medicaid Extenders Act of 2010, the Comprehensive 1099 Taxpayer Protection and Repayment of Exchange Subsidy Overpayments Act of 2011, and the Department of Defense and Full-Year Continuing Appropriations Act, 2011. These final regulations affect individuals who enroll in qualified health plans through Affordable Insurance Exchanges (Exchanges, sometimes called Marketplaces) and claim the health insurance premium tax credit, and Exchanges that make qualified health plans available to individuals and employers.

  9. Serving our communities better. Guidelines for planning and developing integrated delivery networks.

    PubMed

    Prybil, L; Golden, P; Ballance, X

    1995-04-01

    In 1994 the Daughters of Charity National Health System-East Central (DCNHS-East Central) adopted 11 guidelines to help corporate staff and local leaders plan and develop integrated networks. Guideline 1 emphasizes needs-based strategic planning. Guideline 2 focuses on the community-based network planning process, recommending a team approach and ongoing communication with the local ordinary. In guidelines 3 through 5, the DCNHS-East Central Board of Directors spells out key issues that must be covered in proposals ultimately presented for governance action. Guideline 6 presents three core elements that should characterize all CBNs in which DCNHS-East Central institutions participate. Guideline 7 emphasizes that all CBN proposals and agreements must be clear with respect to the Catholic identity of DCNHS-East Central institutions. Guidelines 8 and 9 require that proposed changes to traditional policies and management practices be explicit in CBN proposals. The tenth guideline requires that all CBN proposals indicate an explicit evaluation function. The final guideline underscores that regardless of the strategic fit or how well a CBN is designed, it is unlikely to succeed unless both internal and external relationships are based on a solid foundation of honesty, mutual respect, and trust.

  10. Least-cost transportation planning in ODOT : phase 2 final report.

    DOT National Transportation Integrated Search

    1996-06-01

    This project is intended to suggest ways in which least-cost planning principles could be incorporated into the transportation planning process. The Mt. Hood corridor was chosen for examination. The examination of the planning process highlighted sev...

  11. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  12. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  13. Planning for Disaster.

    ERIC Educational Resources Information Center

    Lewis, Steven

    1996-01-01

    Disaster recovery planning need not be expensive nor complete to be effective. Systematic planning involves several crucial steps, including outlining the final plan, understanding the nature of a disaster's effects and the stages of disaster recovery, prioritizing appropriately, and learning how to test the plan in a practical way for the…

  14. Regional Haze Plan for Texas and Oklahoma

    EPA Pesticide Factsheets

    EPA partially approved and partially disapproved the Texas regional haze plan. EPA also finalized a plan to limit sulfur dioxide emissions from eight Texas coal-fired electricity generating facilities

  15. Attrition/Retention of Urban Special Education Teachers: Multi-Faceted Research and Strategic Action Planning. Final Performance Report, Volume 1. [Chapter Three and Chapter Four].

    ERIC Educational Resources Information Center

    Morvant, Martha; Gersten, Russell

    This paper reports on a study investigating the issues that most significantly influence urban special education teachers' decisions to leave the field voluntarily or transfer to a different type of educational position. First, it presents the results of post-attrition interviews with 17 special educators who left their positions during or…

  16. A Proposed Modified Technical Order System and Its Impact on Maintenance, Personnel and Training. Final Report for Period December 1974-September 1975.

    ERIC Educational Resources Information Center

    Foley, John P., Jr.

    The document presents immediate and long range plans for the systematic injection of Symbolic Integrated Maintenance Systems (SIMS) and Fully Proceduralized Job Performance Aids (FPJPA) materials into the current technical order system and the inclusion of job-oriented training matched to FPJPA into the training system of the Air Force. The text…

  17. Creation of Audiovisual Presentations as a Tool to Develop Key Competences in Secondary-School Students. A Case Study in Science Class

    ERIC Educational Resources Information Center

    Ezquerra, Ángel; Manso, Javier; Burgos, Mª Esther; Hallabrin, Carla

    2014-01-01

    New curricular plans based on key competences create the need for new educational proposals that allow their development. This article describes a proposal to develop key competences through project-based learning. The project's objective is the creation of a digital video. The following study was carried out with students in their final two years…

  18. 75 FR 27944 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ...; State of California; PM-10; Determination of Attainment for the Coso Junction Nonattainment Area... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing its determination that the Coso Junction... Officer, GBUAPCD, to Doris Lo, Environmental Protection Specialist, EPA, with CosoJunction2010--MetAndTEOM...

  19. 77 FR 24483 - Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To Intervene, and...: Wausau Paper Mills, LLC. e. Name of Project: Rhinelander Hydroelectric Project. f. Location: The upper.... Applicant Contact: Mr. Tim Hasbargen, Wausau Paper Mills, LLC, 515 Davenport St., Rhinelander, Wisconsin...

  20. FOCUS: a fire management planning system -- final report

    Treesearch

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  1. Medical loss ratio rebate requirements for non-federal governmental plans. Interim final rule with request for comments.

    PubMed

    2011-12-07

    This interim final rule with comment period revises the regulations implementing medical loss ratio (MLR) requirements for health insurance issuers under the Public Health Service Act in order to establish rules governing the distribution of rebates by issuers in group markets for non-Federal governmental plans.

  2. 77 FR 64734 - Approval and Promulgation of Implementation Plans; North Dakota: Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... Permitting Authority and Tailoring Rule; PM 2.5 NSR Implementation Rule AGENCY: Environmental Protection... Implementation Plan (SIP) relating to regulation of Greenhouse Gases (GHGs) and fine particulate matter (PM 2.5... Tailoring Final Rule'' and the final rule for ``Implementation of the New Source Review (NSR) Program for PM...

  3. 78 FR 34402 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ...-FF03E15000] Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement, Ni... Environmental Impact Statement (FEIS) associated with an application received from NiSource Inc. (hereafter ``Ni... Endangered Species Act of 1973, as amended (ESA). If issued, the ITP would authorize NiSource to take 10...

  4. 76 FR 52690 - Final Environmental Impact Statement on Nabesna Off-Road Vehicle Management Plan, Wrangell-St...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ...-Road Vehicle Management Plan, Wrangell-St. Elias National Park and Preserve AGENCY: National Park... a Final Environmental Impact Statement (FEIS) on Off-Road Vehicle Management in the Nabesna District... preferred alternative and four action alternatives for management of off-road vehicles in the Nabesna...

  5. 75 FR 21342 - Notice of Availability of the Final Environmental Impact Statement for the Mona to Oquirrh...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Corridor Project, Utah, and the Proposed Pony Express Resource Management Plan Amendment AGENCY: Bureau of...)/Proposed Resource Management Plan Amendment (RMPA) for the Mona to Oquirrh Transmission Corridor Project... Final EIS/Proposed RMPA for the Mona to Oquirrh Transmission Corridor Project have been sent to affected...

  6. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  7. 77 FR 24405 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Incinerators'' (HMIWI). The Indiana Department of Environmental Management (IDEM) submitted the revised State... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2012-0086; FRL-9663-2] Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated Facilities and...

  8. An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information (Final Report)

    EPA Science Inventory

    EPA announced the availability of the final report, An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information. This report is a review of decision-making processes of selected land protection prog...

  9. National Primary and Secondary Ambient Air Quality Standards (NAAQS) for Lead (Pb) and Implementation Plans for Lead NAAQS: 1978 Final Rule (43 FR 46246 & 46264)

    EPA Pesticide Factsheets

    This document is a copy of the Federal Register publication of the October 5, 1978 Final Rules for National Primary and Secondary Ambient Air Quality Standards for Lead (Pb) and Implementation Plans for Lead (Pb) NAAQS.

  10. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. OVERVIEW AND APPLICATION. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  11. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 4: ANALYTICAL GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  12. 75 FR 6218 - New Melones Lake Area Resource Management Plan, Tuolumne and Calaveras Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation New Melones Lake Area Resource Management Plan...) has made available for public review a Final RMP/EIS for the New Melones Lake Area. The Final RMP/EIS... Dan Holsapple, Acting New Melones Resource Manager, Bureau of Reclamation, at 209-536- 9094...

  13. 77 FR 76515 - Notice of Availability of the National Petroleum Reserve-Alaska Final Integrated Activity Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAK930000.L13100000.DS0000] Notice of Availability of the National Petroleum Reserve-Alaska Final Integrated Activity Plan/Environmental Impact... of Land Management (BLM), Alaska State Office, is issuing the National Petroleum Reserve in Alaska...

  14. 75 FR 44977 - General Management Plan/Abbreviated Final Environmental Impact Statement, Roosevelt-Vanderbilt...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... Impact Statement for the General Management Plan (GMP/EIS) for Roosevelt-Vanderbilt National Historic Sites, Hyde Park, New York. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets detailing editorial corrections to...

  15. 40 CFR 62.14565 - How do I comply with the increment of progress for achieving final compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... complete retrofit construction of control devices, as specified in the final control plan, so that, when...

  16. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Historic trails. The four alternatives were: Alternative A: Continues existing management practices (no... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement...

  17. An introduction to research for primary dental care clinicians part 9: stage 10. Writing up and disseminating the results.

    PubMed

    Eaton, Kenneth A; Wiles, Laura; O'Malley, David

    2012-04-01

    This paper, the ninth and final one in the series, will address the tenth and final stage of a research project suggested in the first paper. The ten suggested stages are: 1. The initial idea (asking a research question). 2. Searching the literature. 3. Refining the research question. 4. Planning the study. 5. Writing a protocol. 6. Obtaining ethical approval and funding. 7. Piloting the methodology and project management. 8. Collecting data. 9. Analysing the data. 10. Writing up and disseminating the results. The paper outlines the steps that authors should take when seeking to publish the results of research in peer-reviewed journals and how to disseminate results through presentations at scientific conferences. These steps represent the final stage in the research process.

  18. Calibration Results and Anticipated Science Ops for the Parker Solar Probe's SWEAP/SPAN-Electron Analyzers

    NASA Astrophysics Data System (ADS)

    Whittlesey, P. L.; Larson, D. E.; Livi, R.; Abiad, R.; Parker, C.; Halekas, J. S.; Kasper, J. C.; Korreck, K. E.

    2017-12-01

    We present the SPAN-E calibration results and science operation plans this instrument on the Parker Solar Probe mission. SPAN-E is a pair of highly configurable ESA sensors, one on the RAM side of the spacecraft (SPAN-Ae) and one on anti-RAM (SPAN-B). Together, SPAN-E will jointly measure the full 3D thermal and suprathermal electron distribution function at cadences as fast as 4.58Hz. Joined with the SPAN-Ai and SPC instruments that are part of the Solar Wind Electrons, Alphas, and Protons (SWEAP) suite, SPAN-E will measure the solar coronal plasma across a range of energies and densities with a FOV over >90% of the sky, returning data over a 7 year long PSP mission lifetime. The SPAN-E instruments have passed environmental testing at the instrument level, and the final instrument calibrations are complete. This presentation details the final instrument calibration results as performed at UCB/SSL after environmental testing, and details the planned configurations for PSP's first orbit. In addition, the PSP spacecraft's magnetic fields are expected to distort the measured electron VDFs at low energies, thus we present a novel computer vision method of measuring and modeling the spacecraft magnetic fields as seen during an observatory-level "swing" test. Ultimately, the model will feed into an algorithm for ground corrections to electron VDFs distorted by these stray spacecraft magnetic fields.

  19. McClellan AFB, California, RI/FS Quality Assurance Project Plan. Installation Restoration Program (IRP) Stage 3.

    DTIC Science & Technology

    1992-08-07

    AD-A5 6 ... 1... . .. .. .... INSTALLATION RESTORATION PROGRAM (IRP) STAGE 3 7m~ QUALITY ASSURANCE -k- PROJECT PLAN for McCLELLAN AFB , CALIFORNIA...FINAL.. S AUG 2. 1 1992 L PREPARED FOR: .... ... McCLELLAN AFB IEM McCLELLAN AFB , CALIFORNIA 9652-599 ................... fr pu licrele se...PLAN FINAL ’’ : " FOR McCLELLAN AFB /EM McCLELLAN AFB , CALIFORNIA 95652-5990 August 1992 AUG 2 11992 PREPARED BY: DI Radian Corporation10389 Old

  20. Mass Transit: Implementation of FTA’s New Starts Evaluation Process and FY 2001 Funding Proposals

    DTIC Science & Technology

    2000-04-01

    formalize the process. FTA issued a proposed rule on April 7, 1999, and plans to issue final regulations by the summer of 2000. In selecting projects for...commit funds to any more New Starts projects during the last 2 years of TEA-21—through fiscal year 2003. Because there are plans for many more...regional review of alternatives, develop preliminary engineering plans , and meet FTA’s approval for the final design. TEA-21 requires that FTA evaluate

  1. Technical Evaluation Motor No. 7 (TEM-7)

    NASA Technical Reports Server (NTRS)

    Hughes, Phil

    1991-01-01

    The Technical Evaluation Motor No. 7 (TEM-7) test was a full-scale, full duration static test firing of a high performance motor-configuration solid rocket motor with nozzle vectoring. The final test report documents the procedures, performance, and results of the static test firing of TEM-7. All observations, discussions, conclusions, and recommendations included in the report are complete and final except for the TEM-7 fixed housing unbond investigation. A presentation and discussion of TEM-7 performance, anomalies, and test result concurrence with the objectives outlined in CTP-0107, Rev A, Space Shuttle Technical Evaluation Motor No. 7 (TEM-7) Static Fire Test Plan are included.

  2. Nevada State plan; final approval determination. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final State plan approval--Nevada.

    PubMed

    2000-04-18

    This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.

  3. Crew interface definition study, phase 1

    NASA Technical Reports Server (NTRS)

    Callihan, J. C.; Kraemer, J. W.; Alles, J. A.

    1971-01-01

    The timeline analysis of the Shuttle orbiter missions which was conducted in the Phase I Crew Interface Definition Study and the requirements for the man-in-the-loop simulation study are presented. Mission definitions and objectives are presented as they relate to various Shuttle Orbiter missions. The requirements for crew participation and the information required by the crew are discussed, and finally the rationale behind the display concept and calling procedures is given. The simulation objectives, the simulation mechanization, including a detailed presentation of the display and control concept, the simulator test plan and the results are discussed.

  4. AeroPropulsoServoElasticity: Dynamic Modeling of the Variable Cycle Propulsion System

    NASA Technical Reports Server (NTRS)

    Kopasakis, George

    2012-01-01

    This presentation was made at the 2012 Fundamental Aeronautics Program Technical Conference and it covers research work for the Dynamic Modeling of the Variable cycle Propulsion System that was done under the Supersonics Project, in the area of AeroPropulsoServoElasticity. The presentation covers the objective for the propulsion system dynamic modeling work, followed by the work that has been done so far to model the variable Cycle Engine, modeling of the inlet, the nozzle, the modeling that has been done to model the affects of flow distortion, and finally presenting some concluding remarks and future plans.

  5. 78 FR 28775 - Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY... a revision to the North Carolina State Implementation Plan submitted on February 3, 2010, through... particulate matter found in the Code of Federal Regulations. In the Final Rules Section of this Federal...

  6. Modeling synchronous voltage source converters in transmission system planning studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kosterev, D.N.

    1997-04-01

    A Voltage Source Converter (VSC) can be beneficial to power utilities in many ways. To evaluate the VSC performance in potential applications, the device has to be represented appropriately in planning studies. This paper addresses VSC modeling for EMTP, powerflow, and transient stability studies. First, the VSC operating principles are overviewed, and the device model for EMTP studies is presented. The ratings of VSC components are discussed, and the device operating characteristics are derived based on these ratings. A powerflow model is presented and various control modes are proposed. A detailed stability model is developed, and its step-by-step initialization proceduremore » is described. A simplified stability model is also derived under stated assumptions. Finally, validation studies are performed to demonstrate performance of developed stability models and to compare it with EMTP simulations.« less

  7. Optimization of spatiotemporally fractionated radiotherapy treatments with bounds on the achievable benefit

    NASA Astrophysics Data System (ADS)

    Gaddy, Melissa R.; Yıldız, Sercan; Unkelbach, Jan; Papp, Dávid

    2018-01-01

    Spatiotemporal fractionation schemes, that is, treatments delivering different dose distributions in different fractions, can potentially lower treatment side effects without compromising tumor control. This can be achieved by hypofractionating parts of the tumor while delivering approximately uniformly fractionated doses to the surrounding tissue. Plan optimization for such treatments is based on biologically effective dose (BED); however, this leads to computationally challenging nonconvex optimization problems. Optimization methods that are in current use yield only locally optimal solutions, and it has hitherto been unclear whether these plans are close to the global optimum. We present an optimization framework to compute rigorous bounds on the maximum achievable normal tissue BED reduction for spatiotemporal plans. The approach is demonstrated on liver tumors, where the primary goal is to reduce mean liver BED without compromising any other treatment objective. The BED-based treatment plan optimization problems are formulated as quadratically constrained quadratic programming (QCQP) problems. First, a conventional, uniformly fractionated reference plan is computed using convex optimization. Then, a second, nonconvex, QCQP model is solved to local optimality to compute a spatiotemporally fractionated plan that minimizes mean liver BED, subject to the constraints that the plan is no worse than the reference plan with respect to all other planning goals. Finally, we derive a convex relaxation of the second model in the form of a semidefinite programming problem, which provides a rigorous lower bound on the lowest achievable mean liver BED. The method is presented on five cases with distinct geometries. The computed spatiotemporal plans achieve 12-35% mean liver BED reduction over the optimal uniformly fractionated plans. This reduction corresponds to 79-97% of the gap between the mean liver BED of the uniform reference plans and our lower bounds on the lowest achievable mean liver BED. The results indicate that spatiotemporal treatments can achieve substantial reductions in normal tissue dose and BED, and that local optimization techniques provide high-quality plans that are close to realizing the maximum potential normal tissue dose reduction.

  8. 20 CFR 628.426 - Disapproval or revocation of the plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Disapproval or revocation of the plan. (a) If the Governor disapproves the SDA job training plan or plan... training plan or modification may be appealed by the PIC and chief elected official(s) of the SDA to the... and chief elected official(s) of the final disapproval of the SDA job training plan or modification...

  9. Recent developments in the French programme for radioactive waste management planning Act of 28 june 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ouzounian, G.

    2007-07-01

    In 2005, new developments on radioactive-waste management in France were marked mostly by the preparation of the 2006 milestone specified in the act of 30 December 1991. A bill on radioactive waste management has been prepared by the Government at the beginning of 2006 and passed to the French Parliament on 15 June 2006. The Planning Act on the sustainable management of radioactive materials and wastes has been drawn from the results of the 15 years of research performed by ANDRA and the CEA on 'partitioning and transmutation of long-lived radionuclides', 'deep geological disposal' and 'conditioning and long term interimmore » storage'. Major milestones during those two last years are presented, including reviews of the Dossier 2005, official reports, the Public Debate, and finally the Planning Act. (authors)« less

  10. 78 FR 37126 - Approval and Promulgation of Implementation Plans; State of Kansas; Infrastructure SIP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of four Kansas State Implementation Plan... of proposed rulemaking for this action, which was published on April 17, 2013. DATES: This rule will... those portions in the April 17, 2013, proposed rule since they had already been acted upon by EPA. With...

  11. The Collaborative Planning Outreach Project: Building Comprehensive Early Childhood Systems. Final Report.

    ERIC Educational Resources Information Center

    Smith, Barbara J.

    This final report describes the objectives, activities and outcomes of a federally funded initiative to train and assist early childhood interagency teams in a model of planning systems and services for all young children, including children with disabilities and other special needs. The project is based on the value of stakeholder ownership in…

  12. 78 FR 62455 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2013-0499; FRL-9901-35-Region3...: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to..., Associate Director, Office of Air Program Planning, Mailcode 3AP30, U.S. Environmental Protection Agency...

  13. 78 FR 57878 - Notice of Availability of the Proposed Bureau of Land Management Tres Rios Field Office and San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... and Resource Management Plan/Final Environmental Impact Statement AGENCY: Bureau of Land Management... Environmental Impact Statement (LRMP/Final EIS) for the San Juan Public Lands Planning Area in Colorado, and by... and woodlands; and other components of the biological, physical and cultural environment. Copies of...

  14. 77 FR 32022 - Direct Final Negative Declaration and Withdrawal of Large Municipal Waste Combustors State Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ... Negative Declaration and Withdrawal of Large Municipal Waste Combustors State Plan for Designated.... SUMMARY: EPA is taking direct final action to approve Illinois' negative declaration and request for EPA..., the state may submit a letter of certification to that effect, or a negative declaration, in lieu of a...

  15. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS, MODULE 3: SITE CHARACTERIZATION AND SAMPLING GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  16. 75 FR 6813 - Approval of Air Quality Implementation Plans; New Mexico; Albuquerque/Bernalillo County

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-11

    ...). ACTION: Direct final rule. SUMMARY: The EPA is approving revisions to the State Implementation Plan (SIP.... Background III. Summary of Changes to the New Mexico SIP IV. Final Action V. Statutory and Executive Order Reviews I. What Action Is EPA Taking? Today we are approving revisions to the New Mexico SIP, submitted by...

  17. 76 FR 62089 - General Management Plan/Abbreviated Final Environmental Impact Statement, New River Gorge...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... Impact Statement for the General Management Plan (GMP/EIS) for New River Gorge National River, West..., and interpretation of park resources over the next 20 years. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets...

  18. 78 FR 23588 - Final Supplementary Rules for the Morley Nelson Snake River Birds of Prey National Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... Conservation Area (NCA), addressed in the September 2008 Resource Management Plan (RMP) and Record of Decision... an array of management actions designed to conserve natural and cultural resources on BLM... analysis can be found in Chapter 4 of the Proposed Resource Management Plan and Final Environmental Impact...

  19. Examination of the Locus of Positional Effects on Children's Production of Plural -"s": Considerations from Local and Global Speech Planning

    ERIC Educational Resources Information Center

    Theodore, Rachel M.; Demuth, Katherine; Shattuck-Hufnagel, Stefanie

    2015-01-01

    Purpose: Prosodic and articulatory factors influence children's production of inflectional morphemes. For example, plural -"s" is produced more reliably in utterance-final compared to utterance-medial position (i.e., the positional effect), which has been attributed to the increased planning time in utterance-final position. In previous…

  20. Development of energy consumption and energy efficiency potential in the Brazilian industrial sector according to the Integrated Energy Planning Model (IEPM)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tolmasquim, M.T.; Szklo, A.S.; Cohen, C.

    This paper presents the development of energy consumption in the Brazilian industrial sector and energy efficiency potential based on the analysis undertaken through a model developed in the Energy Planning Program at COPPE/UFRJ, known as the Integrated Energy Planning Model (IEPM). The study starts by presenting the IEPM, which is a technical and economic parameter-based model designed to forecast energy supplies and consumption for all economic sectors in Brazil, within three scenarios. Outlines of all three scenarios are presented, as they were constructed according to certain specific assumptions. The industrial sector was broken down into eleven sub-sectors: food and beverages,more » ceramics, cement, iron and steel, mining and pelletizing, ferroalloys, non-ferrous metals and others (metallurgy), chemicals, pulp and paper, textiles and other industries (MME, 1998). All these sub-sectors will also be presented as well as the results of the scenario forecasts. Results deriving from these forecasts come from very specific studies that analyze all process steps in each sub-sector in order to propose energy replacements, efficiency improvements of structural production alterations that result in major potential energy consumption reductions. Last but not least, this paper gives the development forecasts deriving from the three scenarios over ten years, with their contributions to energy efficiency in the Brazilian industrial sector, showing that the authors can reduce energy consumption in the Brazilian industrial sector by: substituting less efficient processes by more efficient ones, through the conversion of final energy into usable energy, basically, in the cement and aluminum industries; replacing equipment and energy sources; modifying product mix of several industries (pulp and paper), assigning top priority to producing goods with higher added value that are less energy intensive, and, finally, reducing the share held by some energy intensive sectors in the industrial output.« less

  1. Performance planning for rural planning organizations - final report.

    DOT National Transportation Integrated Search

    2017-02-01

    Recent federal rules place increased emphasis on performance-based management of the multimodal : transportation system and require the use of performance based methods in state, metropolitan, and : non-metropolitan transportation planning and progra...

  2. Space transfer vehicle concepts and requirements study. Volume 2, book 3: STV system interfaces

    NASA Technical Reports Server (NTRS)

    Weber, Gary A.

    1991-01-01

    This report presents the results of systems analyses and conceptual design of space transfer vehicles (STV). The missions examined included piloted and unpiloted lunar outpost support and spacecraft servicing, and unpiloted payload delivery to various earth and solar orbits. The study goal was to examine the mission requirements and provide a decision data base for future programmatic development plans. The final lunar transfer vehicles provided a wide range of capabilities and interface requirements while maintaining a constant payload mission model. Launch vehicle and space station sensitivity was examined, with the final vehicles as point design covering the range of possible options. Development programs were defined and technology readiness levels for different options were determined. Volume 1 presents the executive summary, volume 2 provides the study results, and volume 3 the cost and WBS data.

  3. Advanced planning for ISS payload ground processing

    NASA Astrophysics Data System (ADS)

    Page, Kimberly A.

    2000-01-01

    Ground processing at John F. Kennedy Space Center (KSC) is the concluding phase of the payload/flight hardware development process and is the final opportunity to ensure safe and successful recognition of mission objectives. Planning for the ground processing of on-orbit flight hardware elements and payloads for the International Space Station is a responsibility taken seriously at KSC. Realizing that entering into this operational environment can be an enormous undertaking for a payload customer, KSC continually works to improve this process by instituting new/improved services for payload developer/owner, applying state-of-the-art technologies to the advanced planning process, and incorporating lessons learned for payload ground processing planning to ensure complete customer satisfaction. This paper will present an overview of the KSC advanced planning activities for ISS hardware/payload ground processing. It will focus on when and how KSC begins to interact with the payload developer/owner, how that interaction changes (and grows) throughout the planning process, and how KSC ensures that advanced planning is successfully implemented at the launch site. It will also briefly consider the type of advance planning conducted by the launch site that is transparent to the payload user but essential to the successful processing of the payload (i.e. resource allocation, executing documentation, etc.) .

  4. The Consensus Plan: Dutchess Community College, 1984-85.

    ERIC Educational Resources Information Center

    Donsky, Aaron P.; And Others

    This 1984-85 Consensus Plan for Dutchess Community College is the result of a comprehensive planning process characterized by three elements: (1) a cycle of departmental input directed by a voluntary planning committee and finalized by the deans and president; (2) an integrated process in which departmental plans reflect the major thrusts…

  5. Task-level robot programming: Integral part of evolution from teleoperation to autonomy

    NASA Technical Reports Server (NTRS)

    Reynolds, James C.

    1987-01-01

    An explanation is presented of task-level robot programming and of how it differs from the usual interpretation of task planning for robotics. Most importantly, it is argued that the physical and mathematical basis of task-level robot programming provides inherently greater reliability than efforts to apply better known concepts from artificial intelligence (AI) to autonomous robotics. Finally, an architecture is presented that allows the integration of task-level robot programming within an evolutionary, redundant, and multi-modal framework that spans teleoperation to autonomy.

  6. Hydraulic-fracture diagnostic research. Final report, December 1989-December 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, J.E.; Adair, R.G.; Clawson, G.E.

    1992-05-01

    The results of the research in microseismic methods to determine hydraulic fracture dimensions during the contract were significant. The GRI Hydraulic Fracture Test Site (HFTS) development planning was a major effort. Ten meetings of the Planning Team were coordinated and hosted. A statement of the HFTS mission, scope, objectives, and requirements was created. The primary objectives were to provide for interdisciplinary experiments on fracture modeling and fracture diagnostics. A Conceptual Plan for the HFTS was compiled by Teledyne Geotech and distributed at the Project Advisors Group meeting. An experiment at the Shell South Belridge Field in California was a directmore » analog of the HFTS. Multiple fracture stimulations were monitored from 3 wells with cemented-in geophones. Methods of handling and processing large data volumes in real time were established. The final fracture geometry did not fit the circular model. Fracture diagnostics were monitored at two GRI cooperative wells: the Enron S. Hogsback No. 13-8A and the Phillips Ward C No. 11. Theoretical studies indicate that crack waves might be used as an estimate of fracture length. After applying advanced signal enhancement techniques to low-frequency signals from 14 surveys, it was concluded that the data from presently available sondes is contaminated by sonde resonances.« less

  7. 75 FR 3680 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... the California State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION... Pollution Control District (SJVAPCD) portion of the California State Implementation Plan (SIP). These... are taking comments on this proposal and plan to follow with a final action. DATES: Any comments must...

  8. Patient Protection and Affordable Care Act; standards related to essential health benefits, actuarial value and accreditation. Final rule.

    PubMed

    2013-02-25

    This final rule sets forth standards for health insurance issuers consistent with title I of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010, referred to collectively as the Affordable Care Act. Specifically, this final rule outlines Exchange and issuer standards related to coverage of essential health benefits and actuarial value. This rule also finalizes a timeline for qualified health plans to be accredited in Federally-facilitated Exchanges and amends regulations providing an application process for the recognition of additional accrediting entities for purposes of certification of qualified health plans.

  9. CPE--A New Perspective: The Impact of the Technology Revolution. Proceedings of the Computer Performance Evaluation Users Group Meeting (19th, San Francisco, California, October 25-28, 1983). Final Report. Reports on Computer Science and Technology.

    ERIC Educational Resources Information Center

    Mobray, Deborah, Ed.

    Papers on local area networks (LANs), modelling techniques, software improvement, capacity planning, software engineering, microcomputers and end user computing, cost accounting and chargeback, configuration and performance management, and benchmarking presented at this conference include: (1) "Theoretical Performance Analysis of Virtual…

  10. Top Ten Tips for Assessing Project-Based Learning: Plus, a Bonus Tip on How to Assemble a PBL Tool Kit

    ERIC Educational Resources Information Center

    George Lucas Educational Foundation, 2011

    2011-01-01

    This classroom guide is intended to inspire and expand teachers' thinking about effective assessment in project-based learning (PBL). The tips listed in this guide are organized to follow the arc of a project. First comes planning, then the launch into active learning, and then a culminating presentation. Reflection is the final stage, and it's…

  11. How to benefit from the coming RBRVS changes.

    PubMed

    Doherty, R B; Ogrod, E S

    1989-09-01

    The Physician Payment Review Commission's endorsement of the Resource-Based Relative Value Scale (RBRVS) represents a major step in reform of the Medicare payment system. Under this plan, cognitive services finally would be reimbursed at the same level for the work involved. The authors present a closer look at the commission's recommendations and discuss how these might substantially improve payment of primary care physicians. They also describe how to get ready.

  12. JPL-20170915-CASSINf-0002-Cassini End of Mission Post Event Press ConferenceAVAIL

    NASA Image and Video Library

    2017-09-15

    This press briefing summarizes the end of NASA-ESA's Cassini-Huygens mission to Saturn and presents the final images made by the spacecraft before its planned disintegration in Saturn's atmosphere on September 15, 2017. Featured: Earl Maize, Cassini Program Manager, JPL; Linda Spilker, Cassini Project Scientist, JPL; Julie Webster, Cassini Spacecraft operations Manager, JPL; and Thomas Zurbuchen, Associate Administrator, Science Mission Directorate, NASA HQ.

  13. ATD-1 Operational Integration Assessment Final Report

    NASA Technical Reports Server (NTRS)

    Witzberger, Kevin E.; Sharma, Shivanjli; Martin, Lynn Hazel; Wynnyk, Mitch; McGarry, Katie

    2015-01-01

    The FAA and NASA conducted an Operational Integration Assessment (OIA) of a prototype Terminal Sequencing and Spacing (formerly TSS, now TSAS) system at the FAA's William J. Hughes Technical Center (WJHTC). The OIA took approximately one year to plan and execute, culminating in a formal data collection, referred to as the Run for Record, from May 12-21, 2015. This report presents quantitative and qualitative results from the Run for Record.

  14. Study 2.5 final report. DORCA computer program. Volume 4: Executive summary report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The functions and capabilities of the Dynamic Operational Requirements and Cost Analysis Program are explained. The existence and purpose of the program are presented to provide an evaluation of program applicability to areas of responsibility for potential users. The implementation of the program on the Univac 1108 computer is discussed. The application of the program for mission planning and project management is described.

  15. The Development of a Consumer Input Program for the National Library Service for the Blind and Physically Handicapped (NLS/BPH) and Network Libraries. Final Report.

    ERIC Educational Resources Information Center

    Cavenaugh, David

    This document presents a review of the current consumer relations activites of the National Library Service (NLS) for the Blind and Physically Handicapped of the Library of Congress, and an overall plan to improve NLS receipt of user suggestions, comments, opinions, or complaints through libraries which form the nationwide NLS distribution system.…

  16. Test Plan Development for Plastic Ammunition Containers. Volume 1

    DTIC Science & Technology

    1989-03-15

    1850 Black Canyon Stage¶I Packaging division (SMCAR-AEP) Picatinny Phoenix, Arizona 85027 Arsenal, New Jersey 07806-5000 86. NAME OF FUNDING...packaging containers. The report is presented in two separate volumes. Volume I contains the Final Technical Report and includes the analysis of... Division of the U.S. Army Armament Research, Development and Engineering Center. Mr. Jasper C. Griggs and Mr. D. E. Jones served as technical consultants

  17. Acceptance testing for PACS: from methodology to design to implementation

    NASA Astrophysics Data System (ADS)

    Liu, Brent J.; Huang, H. K.

    2004-04-01

    Acceptance Testing (AT) is a crucial step in the implementation process of a PACS within a clinical environment. AT determines whether the PACS is ready for clinical use and marks the official sign off of the PACS product. Most PACS vendors have Acceptance Testing (AT) plans, however, these plans do not provide a complete and robust evaluation of the full system. In addition, different sites will have different special requirements that vendor AT plans do not cover. The purpose of this paper is to introduce a protocol for AT design and present case studies of AT performed on clinical PACS. A methodology is presented that includes identifying testing components within PACS, quality assurance for both functionality and performance, and technical testing focusing on key single points-of-failure within the PACS product. Tools and resources that provide assistance in performing AT are discussed. In addition, implementation of the AT within the clinical environment and the overall implementation timeline of the PACS process are presented. Finally, case studies of actual AT of clinical PACS performed in the healthcare environment will be reviewed. The methodology for designing and implementing a robust AT plan for PACS was documented and has been used in PACS acceptance tests in several sites. This methodology can be applied to any PACS and can be used as a validation for the PACS product being acquired by radiology departments and hospitals. A methodology for AT design and implementation was presented that can be applied to future PACS installations. A robust AT plan for a PACS installation can increase both the utilization and satisfaction of a successful implementation of a PACS product that benefits both vendor and customer.

  18. Transfusion Indication Threshold Reduction (TITRe2) randomized controlled trial in cardiac surgery: statistical analysis plan.

    PubMed

    Pike, Katie; Nash, Rachel L; Murphy, Gavin J; Reeves, Barnaby C; Rogers, Chris A

    2015-02-22

    The Transfusion Indication Threshold Reduction (TITRe2) trial is the largest randomized controlled trial to date to compare red blood cell transfusion strategies following cardiac surgery. This update presents the statistical analysis plan, detailing how the study will be analyzed and presented. The statistical analysis plan has been written following recommendations from the International Conference on Harmonisation of Technical Requirements for Registration of Pharmaceuticals for Human Use, prior to database lock and the final analysis of trial data. Outlined analyses are in line with the Consolidated Standards of Reporting Trials (CONSORT). The study aims to randomize 2000 patients from 17 UK centres. Patients are randomized to either a restrictive (transfuse if haemoglobin concentration <7.5 g/dl) or liberal (transfuse if haemoglobin concentration <9 g/dl) transfusion strategy. The primary outcome is a binary composite outcome of any serious infectious or ischaemic event in the first 3 months following randomization. The statistical analysis plan details how non-adherence with the intervention, withdrawals from the study, and the study population will be derived and dealt with in the analysis. The planned analyses of the trial primary and secondary outcome measures are described in detail, including approaches taken to deal with multiple testing, model assumptions not being met and missing data. Details of planned subgroup and sensitivity analyses and pre-specified ancillary analyses are given, along with potential issues that have been identified with such analyses and possible approaches to overcome such issues. ISRCTN70923932 .

  19. Let the pigeon drive the bus: pigeons can plan future routes in a room.

    PubMed

    Gibson, Brett; Wilkinson, Matthew; Kelly, Debbie

    2012-05-01

    The task of determining an optimal route to several locations is called the traveling salesperson problem (TSP). The TSP has been used recently to examine spatial cognition in humans and non-human animals. It remains unclear whether or not the decision process of animals other than non-human primates utilizes rigid rule-based heuristics, or whether non-human animals are able to flexibly 'plan' future routes/behavior based on their knowledge of multiple locations. We presented pigeons in a One-way and Round-Trip group with TSPs that included two or three destinations (feeders) in a laboratory environment. The pigeons departed a start location, traveled to each feeder once before returning to a final destination. Pigeons weighed the proximity of the next location heavily, but appeared to plan ahead multiple steps when the travel costs for inefficient behavior appeared to increase. The results provide clear and strong evidence that animals other than primates are capable of planning sophisticated travel routes.

  20. Put two (and two) together to make the most of physical activity and healthy nutrition - A longitudinal online study examining cross-behavioural mechanisms in multiple health behaviour change.

    PubMed

    Paech, Juliane; Lippke, Sonia

    2017-01-01

    Recommendations for physical activity and for fruit and vegetable intake are often not translated into action due to deficits in self-regulatory strategies. The present study examines the interplay of intention, intergoal facilitation, action and coping planning and self-regulation in facilitating physical activity and healthy nutrition. In an online study, intentions and behaviours were assessed at baseline, intergoal facilitation and planning at 4-week follow-up, self-regulation, physical activity and nutrition at 6-month follow-up in a non-clinical sample. The final sample (n = 711) consisted of 27.2% men, the age ranged from 16 to 78 years. Sequential mediations were tested. Intergoal facilitation, planning and self-regulation mediated the link from intention to physical activity and nutrition; the specific indirect effects were significant. Findings suggest that intergoal facilitation and self-regulation can facilitate behaviour change, in addition to planning. Cross-behavioural mechanisms might facilitate lifestyle change in several domains.

  1. Standby gasoline rationing plan

    DOT National Transportation Integrated Search

    1980-06-01

    Title 10 - Energy, Chapter II - Department of Energy, PART 570 - Standby gasoline rationing plan regulations. Final rules adopted by the President for a Standby Gasoline Rationing Plan required by the Energy Policy and Conservation Act of 1979 (P.L. ...

  2. Weather Information Communication (WINCOMM) VDL-3 and 1090ES Final Test Requirements, Test Plans, and Test Results

    NASA Technical Reports Server (NTRS)

    Griner, James H.; Jirberg, Russ; Frantz, Brian; Kachmar, Brian A.

    2006-01-01

    NASA s Aviation Safety Program was created for the purpose of making a significant reduction in the incidents of weather related aviation accidents by improving situational awareness. The objectives of that program are being met in part through advances in weather sensor technology, and in part through advances in the communications technology that are developed for use in the National Airspace System. It is this latter element, i.e., the improvements in aviation communication technologies, that is the focus of the Weather Information Communications project. This report describes the final flight test results completed under the WINCOMM project at the NASA Glenn Research Center of the 1090 Extended Squitter (1090ES) and VDL Mode 3 (VDL-3) data links as a medium for weather data exchange. It presents the use of 1090ES to meet the program objectives of sending broadcast turbulence information and the use of VDL-3 to send graphical weather images. This report provides the test requirements and test plans, which led to flight tests, as well as final results from flight testing. The reports define the changes made to both avionics and ground-based receivers as well as the ground infrastructure to support implementation of the recommended architecture, with a focus on the issues associated with these changes.

  3. Through The Decades - Changes in Social, Economic, Legal and Planning Determinants of Residential Development across Decades - Evidence from Suburban Areas in Poland

    NASA Astrophysics Data System (ADS)

    Źróbek-Różańska, Alina; Zysk, Elżbieta; Źróbek, Ryszard

    2017-10-01

    Poland has experienced many political, legal, social and economic transformations. For the last twelve decades, this country was under foreign partition, in the war, under the influence of socialist system with centrally planned economy and finally regained autonomy and rapidly introduced market economy. Each epoch had its own characteristic, that can be recognized also in the residential buildings development. Therefore, the authors focused on the social, economic, legal and planning conditionings that shaped the development of the residential buildings with the most characteristic periods: pre-II world war, 50-ties, 60-ties, 70-ties, 80-ties, 90-ties and XXI century. Some of them are visible in the still existing residential buildings, especially in the suburban villages. The most recent process that can be observed in the study area is urban sprawl. Since the beginning of the XXI century, urban population in Poland has been gradually declining, while suburban villages transform into ‘urban-like’ districts. The aim of the study was to arrange and present in the decade-by-decade manner, the social, economic, legal and planning conditionings that were valid in particular periods. It was realized by correlating information on the contemporary social trends, economic conditions, legal framework and planning regulations. Presentation was enriched by the examples of the buildings developed in the accordance with the contemporary restrictions.

  4. 300 Area dangerous waste tank management system: Compliance plan approach. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    In its Dec. 5, 1989 letter to DOE-Richland (DOE-RL) Operations, the Washington State Dept. of Ecology requested that DOE-RL prepare ``a plant evaluating alternatives for storage and/or treatment of hazardous waste in the 300 Area...``. This document, prepared in response to that letter, presents the proposed approach to compliance of the 300 Area with the federal Resource Conservation and Recovery Act and Washington State`s Chapter 173-303 WAC, Dangerous Waste Regulations. It also contains 10 appendices which were developed as bases for preparing the compliance plan approach. It refers to the Radioactive Liquid Waste System facilities and to the radioactive mixedmore » waste.« less

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mauro, R.; Leach, S.

    This paper summarizes current and planned activities in the areas of hydrogen production and use, near-term venture opportunities, and codes and standards. The rationale for these efforts is to assess industry interest and engage in activities that move hydrogen technologies down the path to commercialization. Some of the work presented in this document is a condensed, preliminary version of reports being prepared under the DOE/NREL contract. In addition, the NHA work funded by Westinghouse Savannah River Corporation (WSRC) to explore the opportunities and industry interest in a Hydrogen Research Center is briefly described. Finally, the planned support of and industrymore » input to the Hydrogen Technical Advisory Panel (HTAP) on hydrogen demonstration projects is discussed.« less

  6. 76 FR 37207 - Group Health Plans and Health Insurance Issuers: Rules Relating to Internal Claims and Appeals...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ...This document contains amendments to interim final regulations implementing the requirements regarding internal claims and appeals and external review processes for group health plans and health insurance coverage in the group and individual markets under provisions of the Affordable Care Act. These rules are intended to respond to feedback from a wide range of stakeholders on the interim final regulations and to assist plans and issuers in coming into full compliance with the law through an orderly and expeditious implementation process.

  7. 78 FR 2655 - Uinta-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ...-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project AGENCY: Forest Service, USDA. ACTION... prepare a supplement to the Ogden Travel Plan Revision Final Supplemental Environmental Impact Statement (FSEIS). The Ogden Travel Plan Revision FSEIS evaluated six alternatives for possible travel management...

  8. 78 FR 60099 - Nontank Vessel Response Plans and Other Response Plan Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... Convention for the Prevention of Pollution From Ships MEPC Marine Environment Protection Committee NAICS... vessels to prepare and submit oil spill response plans. The Federal Water Pollution Control Act defines.... Additionally, this final rule updates the international Shipboard Oil Pollution Emergency Plan requirements...

  9. 78 FR 68005 - Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... this Federal Register, EPA is approving the State's implementation plan revision as a direct final rule...] Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP--Memorandum... proposing to approve a State Implementation Plan revision submitted by the Mississippi Department of...

  10. Determination of State Budgets for the Final Ozone Supplemental of the Transport Rule TSD

    EPA Pesticide Factsheets

    In this final rulemaking, EPA finalizes Federal Implementation Plans (FIPs) to address significant contribution to nonattainment and interference with maintenance in Iowa, Michigan, Missouri, Oklahoma, and Wisconsin.

  11. CSAPR Direct Final Rule (77 FR 10342)

    EPA Pesticide Factsheets

    EPA takes direct final action on additional revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals published August 8, 2011).

  12. 77 FR 54922 - Record of Decision for the General Management Plan/Final Environmental Impact Statement, Hampton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ...: Pursuant to 102 (2)(c) of the National Environmental Policy Act of 1969 (NEPA), the National Park Service (NPS) announces the availability of the Record of Decision for the Final General Management Plan and... to include the entire story of the park, from its beginnings in the 18th century to its heyday in the...

  13. 78 FR 28051 - Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed On or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ...This action finalizes amendments to the federal plan and the new source performance standards for hospital/medical/infectious waste incinerators. This final action implements national standards promulgated in the 2009 amendments to the hospital/medical/infectious waste incinerator emissions guidelines that will result in reductions in emissions of certain pollutants from all affected units.

  14. 77 FR 29682 - Gulf of Mexico, Outer Continental Shelf, Central Planning Area, Oil and Gas Lease Sale 216/222

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... and Gas Lease Sale: 2012 Central Planning Area (CPA) Lease Sale 216/222 Authority: This NOA is... a ROD following the completion of the Final SEIS for CPA Consolidated Lease Sale 216/222, the final... SEIS updates two previous environmental and socioeconomic analyses for CPA Lease Sale 216/222. The GOM...

  15. Task Analysis and Descriptions of Required Job Competencies for Robotics/Automated Systems Technicians. Final Report. Volume 2. Curriculum Planning Guide.

    ERIC Educational Resources Information Center

    Hull, Daniel M.; Lovett, James E.

    This volume of the final report for the Robotics/Automated Systems Technician (RAST) curriculum project is a curriculum planning guide intended for school administrators, faculty, and student counselors/advisors. It includes step-by-step procedures to help institutions evaluate their community's needs and their capabilities to meet these needs in…

  16. 76 FR 62824 - Notice of Final Supplementary Rules for Public Lands in Colorado: Bangs Canyon Special Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... Management Area Management Plan (BCSRMAMP) and the Grand Junction Resource Management Plan (GJRMP). These... 43 U.S.C. 1740, 43 U.S.C. 315a, and 43 CFR 8365.1-6 II. Background Recreation resource management... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCON03000-L12200000-PA0000] Notice of Final...

  17. Analysis of Final Energy Consumption Patterns in 10 Arab Countries

    NASA Astrophysics Data System (ADS)

    Al-Hinti, I.; Al-Ghandoor, A.

    2009-08-01

    This study presents an analysis of the energy consumption patterns in 10 Arab countries: Saudi Arabia, Kuwait, United Arab Emirates (UAE), Syria, Lebanon, Jordan, Egypt, Libya, Tunisia, and Algeria. Commonalities and variations between these countries are discussed and explained through key economic and energy indicators, and the relationship between the overall final energy consumption per capita and the GDP per capita is examined. The distribution of the final energy consumption across different sectors is also analysed, and the patterns of consumption in the industrial, transportation, and residential sectors are discussed with focus on the types of energy consumed, and the main drivers of this consumption. The findings and the conclusions of this study are believed to be beneficial to the national energy policy planners in identifying possible strengths, weaknesses, and areas of emphasis and improvement in their strategic energy plans.

  18. Cassini Attitude and Articulation Control Subsystem Fault Protection Challenges During Saturn Proximal Orbits

    NASA Technical Reports Server (NTRS)

    Bates, David M.

    2015-01-01

    NASA's Cassini Spacecraft, launched on October 15th, 1997 arrived at Saturn on June 30th, 2004, is the largest and most ambitious interplanetary spacecraft in history. As the first spacecraft to achieve orbit at Saturn, Cassini has collected science data throughout its four-year prime mission (2004-08), and has since been approved for a first and second extended mission through 2017. As part of the final extended mission, Cassini will begin an aggressive and exciting campaign of high inclination low altitude flybys within the inner most rings of Saturn, skimming Saturn's outer atmosphere, until the spacecraft is finally disposed of via planned impact with the planet. This final campaign, known as the proximal orbits, presents unique fault protection related challenges, the details of which are discussed in this paper.

  19. Improving the Operations of the Earth Observing One Mission via Automated Mission Planning

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Tran, Daniel; Rabideau, Gregg; Schaffer, Steve; Mandl, Daniel; Frye, Stuart

    2010-01-01

    We describe the modeling and reasoning about operations constraints in an automated mission planning system for an earth observing satellite - EO-1. We first discuss the large number of elements that can be naturally represented in an expressive planning and scheduling framework. We then describe a number of constraints that challenge the current state of the art in automated planning systems and discuss how we modeled these constraints as well as discuss tradeoffs in representation versus efficiency. Finally we describe the challenges in efficiently generating operations plans for this mission. These discussions involve lessons learned from an operations model that has been in use since Fall 2004 (called R4) as well as a newer more accurate operations model operational since June 2009 (called R5). We present analysis of the R5 software documenting a significant (greater than 50%) increase in the number of weekly observations scheduled by the EO-1 mission. We also show that the R5 mission planning system produces schedules within 15% of an upper bound on optimal schedules. This operational enhancement has created value of millions of dollars US over the projected remaining lifetime of the EO-1 mission.

  20. Comprehensive Environmental Assessment Applied to ...

    EPA Pesticide Factsheets

    In September 2013, EPA announced the availability of the final report, Comprehensive Environmental Assessment Applied to Multiwalled Carbon Nanotube Flame-Retardant Coatings in Upholstery Textiles: A Case Study Presenting Priority Research Gaps for Future Risk Assessments. This final report presents a case study of multiwalled carbon nanotubes (MWCNTs); it focuses on the specific example of MWCNTs as used in flame-retardant coatings applied to upholstery textiles. This case study is organized around the comprehensive environmental assessment (CEA) framework, which structures available information pertaining to the product life cycle, environmental transport and fate, exposure-dose in receptors (i.e., humans, ecological populations, and the environment), and potential impacts in these receptors. A group of experts representing multiple disciplines and multiple sector perspectives used an earlier draft of the case study in conjunction with a structured workshop process to identify and prioritize research gaps that, if pursued, could inform future MWCNT assessment efforts. The final report is not a health, risk, or exposure assessment and as such does not draw conclusions about potential risks, or present an exhaustive review of the literature. Rather, it presents the MWCNT research priorities that experts identified in this application of CEA in order to aid research planning throughout the scientific community. The outcomes of these research efforts may subsequ

  1. Patient Protection and Affordable Care Act; establishment of exchanges and qualified health plans; Small Business Health Options Program. Final rule.

    PubMed

    2013-06-04

    This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act) related to the Small Business Health Options Program (SHOP). Specifically, this final rule amends existing regulations regarding triggering events and special enrollment periods for qualified employees and their dependents and implements a transitional policy regarding employees' choice of qualified health plans (QHPs) in the SHOP.

  2. 75 FR 34537 - Interim Final Rules for Group Health Plans and Health Insurance Coverage Relating to Status as a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... 45 CFR Part 147 Group Health Plans and Health Insurance Coverage Relating to Status as a... for Group Health Plans and Health Insurance Coverage Relating to Status as a Grandfathered Health Plan... group health plans and health insurance coverage in the group and individual markets under provisions of...

  3. Care Planning, Quality Assurance, and Personnel Management in Long-Term Care Facilities. Final Report.

    ERIC Educational Resources Information Center

    Patchner, Michael A.; Balgopal, Pallassana R.

    Three studies were undertaken to examine topics of care planning, personnel management, and quality assurance in long-term care facilities. The first study examined the formulation and implementation processes of care planning for nursing home residents. The exemplary homes' care planning included the existence of strong care planning leadership,…

  4. South Dakota ITS/CVO business plan : final business plan

    DOT National Transportation Integrated Search

    1998-01-18

    This report defines an Intelligent Transportation Systems/Commercial Vehicle Operations (ITS/CVO) program for the State of South Dakota. Structured as a business plan, the document includes the following components: 1) description of the current CVO ...

  5. Freight planning support system : final summary report

    DOT National Transportation Integrated Search

    2003-07-01

    This report summarizes the activities and the findings of the Freight Planning Support System (FPSS) project conducted for the North Jersey Transportation Planning Authority (NJTPA). The underlying purpose of the project is to allow for better projec...

  6. Integrating climate change into the transportation planning process : final report

    DOT National Transportation Integrated Search

    2008-07-01

    The objective of this study is to advance the practice and application of transportation planning among state, regional, and local transportation planning agencies to successfully meet growing concerns about the relationship between transportation an...

  7. Graduate certificate in transportation planning : final report

    DOT National Transportation Integrated Search

    2008-12-12

    The purpose of this project was to develop and implement a graduate Certificate in Transportation Planning at Texas : A&M University. Texas A&M currently offers instruction in transportation through its Masters of Urban Planning and : Civil Engineeri...

  8. Employee Retirement Income Security Act of 1974: rules and regulations for administration and enforcement; claims procedure. Pension and Welfare Benefits Administration, Labor. Final regulation.

    PubMed

    2000-11-21

    This document contains a final regulation revising the minimum requirements for benefit claims procedures of employee benefit plans covered by Title I of the Employee Retirement Income Security Act of 1974 (ERISA or the Act). The regulation establishes new standards for the processing of claims under group health plans and plans providing disability benefits and further clarifies existing standards for all other employee benefit plans. The new standards are intended to ensure more timely benefit determinations, to improve access to information on which a benefit determination is made, and to assure that participants and beneficiaries will be afforded a full and fair review of denied claims. When effective, the regulation will affect participants and beneficiaries of employee benefit plans, employers who sponsor employee benefit plans, plan fiduciaries, and others who assist in the provision of plan benefits, such as third-party benefits administrators and health service providers or health maintenance organizations that provide benefits to participants and beneficiaries of employee benefit plans.

  9. Patient Protection and Affordable Care Act; HHS Notice of Benefit and Payment Parameters for 2018; Amendments to Special Enrollment Periods and the Consumer Operated and Oriented Plan Program. Final rule.

    PubMed

    2016-12-22

    This final rule sets forth payment parameters and provisions related to the risk adjustment program; cost-sharing parameters and cost-sharing reductions; and user fees for Federally-facilitated Exchanges and State-based Exchanges on the Federal platform. It also provides additional guidance relating to standardized options; qualified health plans; consumer assistance tools; network adequacy; the Small Business Health Options Programs; stand-alone dental plans; fair health insurance premiums; guaranteed availability and guaranteed renewability; the medical loss ratio program; eligibility and enrollment; appeals; consumer-operated and oriented plans; special enrollment periods; and other related topics.

  10. [Endodontically treated teeth. Success--failure. Endorestorative treatment plan].

    PubMed

    Zabalegui, B

    1990-01-01

    More and more often the general dentist is finding the presence of endodontically treated teeth during his treatment planning procedure. He has to ask himself if the endo-treated tooth functions and will continue to function function successfully, when deciding which final endo-restorative procedure to apply. For this reason the dentist or the endodontist with whom he works should clinically evaluate these teeth, establish a diagnostic criteria of their success or failure and a treatment plan according to the prognosis. The purpose of this article is to offer an organized clinical view of the steps to follow when evaluating an endodontically treated tooth and how to establish a final endo-restorative plan.

  11. Behavioral Health and Performance (BHP) Standing Review Panel (SRP) Final Report

    NASA Technical Reports Server (NTRS)

    Suedfeld, Peter; Bootzin, Richard; Harvey, Allison; Leon, Gloria; Musson, David; Oltmanns, Thomas; Paulus, Martin

    2010-01-01

    The first meeting of the Behavioral Health and Performance (BHP) Standing Review Panel (SRP) was held in Houston, TX on November 1-3, 2009. Our task was to assess the Integrated Research Plan (IRP) related to the fields covered in the SRP charge (see section VIII). Having considered and discussed the extensive materials distributed prior to the meeting, and the highly informative briefings by the NASA BHP Human Research Program (HRP) personnel during the site visit, the SRP agreed that the IRP is comprehensive and was developed carefully. Question and answer periods with the presenters were particularly productive and helpful to the SRP. The presenters' willingness to share information and positive responses to the SRP's suggestions were greatly appreciated. Although the IRP and related documents are impressive, the SRP does have a number of recommendations regarding both the overall plan and its component parts.

  12. Social survey findings on en route noise annoyance issues

    NASA Technical Reports Server (NTRS)

    Fields, James M.

    1990-01-01

    Most surveys of residents' reactions to aircraft noise were conducted in the vicinity of airports. The findings in those surveys have supported planning and regulatory actions for the airport noise environment. Now, however, aircraft noise planning and regulations are being considered for a new environment, the en route environment. As policy makers search for bases for public policy in these new noise environments, it is appropriate to ask whether the same scientific evidence which supports airport noise policy can also support en route noise policy. Several aspects of that question are considered. An introduction establishes the scope of the present study and examines alternative study methodologies. Next, the selected study methodology is described and important assumptions are listed. The body of the paper then consists of the findings on en route issues. The final section presents findings on relevant research methods and considers priorities for further research.

  13. 75 FR 55973 - Salvage and Marine Firefighting Requirements; Vessel Response Plans for Oil

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... and Marine Firefighting Requirements; Vessel Response Plans for Oil AGENCY: Coast Guard, DHS. ACTION... the vessel response plan salvage and marine firefighting requirements for tank vessels carrying oil... Marine Firefighting Requirements; Vessel Response Plans for Oil'' (73 FR 80618). The final rule amended...

  14. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  15. National Data Program for the Marine Environment Technical Development Plan. Final Report, Volume Two.

    ERIC Educational Resources Information Center

    System Development Corp., Santa Monica, CA.

    A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)

  16. 78 FR 78310 - Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... Federal Register, EPA is approving the State's implementation plan revision as a direct final rule without...] Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity Memorandum of... Implementation Plan submitted on July 12, 2013, through the North Carolina Department of Environment and Natural...

  17. Northrop TRIGA facility decommissioning plan versus actual results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gardner, F.W.

    1986-01-01

    This paper compares the TRIGA facility decontamination and decommissioning (D and D) plan to the actual results and discusses key areas where operational activities were impacted by the final US Nuclear Regulatory Commission approved D and D plan. A discussion of fuel transport, release criteria, and release survey plans is included.

  18. Community and facility-level engagement in planning and budgeting for the government health sector--a district perspective from Kenya.

    PubMed

    O'Meara, Wendy Prudhomme; Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine; McKenzie, F Ellis

    2011-03-01

    Health systems reform processes have increasingly recognized the essential contribution of communities to the success of health programs and development activities in general. Here we examine the experience from Kilifi district in Kenya of implementing annual health sector planning guidelines that included community participation in problem identification, priority setting, and planning. We describe challenges in the implementation of national planning guidelines, how these were met, and how they influenced final plans and budgets. The broad-based community engagement envisaged in the guidelines did not take place due to the delay in roll out of the Ministry of Health-trained community health workers. Instead, community engagement was conducted through facility management committees, though in a minority of facilities, even such committees were not involved. Some overlap was found in the priorities highlighted by facility staff, committee members and national indicators, but there were also many additional issues raised by committee members and not by other groups. The engagement of the community through committees influenced target and priority setting, but the emphasis on national health indicators left many local priorities unaddressed by the final work plans. Moreover, it appears that the final impact on budgets allocated at district and facility level was limited. The experience in Kilifi highlights the feasibility of engaging the community in the health planning process, and the challenges of ensuring that this engagement feeds into consolidated plans and future implementation. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.

  19. 77 FR 2993 - Final Environmental Impact Statement and Record of Decision on Oncor Electric Delivery Company's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ...-FF02ENEH00] Final Environmental Impact Statement and Record of Decision on Oncor Electric Delivery Company's... the final environmental impact statement (EIS), and final record of decision under the National... implementation of the final Oncor Electric Delivery LLC's Habitat Conservation Plan (HCP). Our decision is to...

  20. Galileo Press Conference from JPL. Parts 1 and 2

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This two-tape Jet Propulsion Laboratory (JPL) video production presents a Dec. 8, 1992 press conference held at JPL to discuss the final Galileo spacecraft encounter with Earth before beginning its journey to Jupiter. The main theme of the conference was centered on the significance of the 2nd and final Earth/Moon flyby as being the spacecraft's last planetary encounter in the solar system before reaching Jupiter, as well as final flight preparations prior to its final journey. Each person of the five member panel was introduced by Robert MacMillan (JPL Public Information Mgr.) before giving brief presentations including slides and viewgraphs covering their area of expertise regarding Galileo's current status and future plans. After the presentations, the media was given an opportunity to ask questions of the panel regarding the mission. Mr. Wesley Huntress (Dir. of Solar System Exploration (NASA)), William J. ONeill (Galileo Project Manager), Neal E. Ausman, Jr. (Galileo Mission Director), Dr. Torrence V. Johnson (Galileo Project Scientist) and Dr. Ronald Greeley (Member, Imaging Team, Colorado St. Univ.) made up the panel and discussed topics including: Galileo's interplanetary trajectory; project status and performance review; instrument calibration activities; mission timelines; lunar observation and imaging; and general lunar science. Also included in the last three minutes of the video are simulations and images of the 2nd Galileo/Moon encounter.

  1. Methodology to design a municipal solid waste pre-collection system. A case study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gallardo, A., E-mail: gallardo@uji.es; Carlos, M., E-mail: mcarlos@uji.es; Peris, M., E-mail: perism@uji.es

    Highlights: • MSW recovery starts at homes; therefore it is important to facilitate it to people. • Additionally, to optimize MSW collection a previous pre-collection must be planned. • A methodology to organize pre-collection considering several factors is presented. • The methodology has been verified applying it to a Spanish middle town. - Abstract: The municipal solid waste (MSW) management is an important task that local governments as well as private companies must take into account to protect human health, the environment and to preserve natural resources. To design an adequate MSW management plan the first step consists in definingmore » the waste generation and composition patterns of the town. As these patterns depend on several socio-economic factors it is advisable to organize them previously. Moreover, the waste generation and composition patterns may vary around the town and over the time. Generally, the data are not homogeneous around the city as the number of inhabitants is not constant nor it is the economic activity. Therefore, if all the information is showed in thematic maps, the final waste management decisions can be made more efficiently. The main aim of this paper is to present a structured methodology that allows local authorities or private companies who deal with MSW to design its own MSW management plan depending on the available data. According to these data, this paper proposes two ways of action: a direct way when detailed data are available and an indirect way when there is a lack of data and it is necessary to take into account bibliographic data. In any case, the amount of information needed is considerable. This paper combines the planning methodology with the Geographic Information Systems to present the final results in thematic maps that make easier to interpret them. The proposed methodology is a previous useful tool to organize the MSW collection routes including the selective collection. To verify the methodology it has been successfully applied to a Spanish town.« less

  2. The power of the group in Northern Ireland.

    PubMed

    Schulte, Robert; Lovett, Hallie; Rice, Cecil; Williams, Rob

    2014-10-01

    Writing in a narrative tradition, the authors report on the 14th and final convening of the Boston-Threshold Group-sponsored annual Northern Ireland Group Psychotherapy Conference. "It Can Be Done: The Power of the Group to Bear the Unbearable." They provide context and leadership perspectives on the history of the conference and the planning of its final meeting. Associations to the opening plenary presentation of the play Rounding Third, by Richard Dresser, as performed by the Red Well Theater Group, link themes of power sharing, trauma, containment, and hope to the here-and-now experience of the conference participants. Personal meanings attributed to the conference tradition and its ending are shared.

  3. Tank 241-AN-101, grab samples, 1AN-98-1, 1AN-98-2 and 1AN-98-3 analytical results for the final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FULLER, R.K.

    1999-02-24

    This document is the final report for tank 241-AN-101 grab samples. Three grab samples 1AN-98-1, 1AN-98-2 and 1AN-98-3 were taken from riser 16 of tank 241-AN-101 on April 8, 1998 and received by the 222-S Laboratory on April 9, 1998. Analyses were performed in accordance with the ''Compatability Grab Sampling and Analysis Plan'' (TSAP) and the ''Data Quality Objectives for Tank Farms Waste Compatability Program'' (DQO). The analytical results are presented in the data summary report. No notification limits were exceeded.

  4. Quantification of dose uncertainties for the bladder in prostate cancer radiotherapy based on dominant eigenmodes

    NASA Astrophysics Data System (ADS)

    Rios, Richard; Acosta, Oscar; Lafond, Caroline; Espinosa, Jairo; de Crevoisier, Renaud

    2017-11-01

    In radiotherapy for prostate cancer the dose at the treatment planning for the bladder may be a bad surrogate of the actual delivered dose as the bladder presents the largest inter-fraction shape variations during treatment. This paper presents PCA models as a virtual tool to estimate dosimetric uncertainties for the bladder produced by motion and deformation between fractions. Our goal is to propose a methodology to determine the minimum number of modes required to quantify dose uncertainties of the bladder for motion/deformation models based on PCA. We trained individual PCA models using the bladder contours available from three patients with a planning computed tomography (CT) and on-treatment cone-beam CTs (CBCTs). Based on the above models and via deformable image registration (DIR), we estimated two accumulated doses: firstly, an accumulated dose obtained by integrating the planning dose over the Gaussian probability distribution of the PCA model; and secondly, an accumulated dose obtained by simulating treatment courses via a Monte Carlo approach. We also computed a reference accumulated dose for each patient using his available images via DIR. Finally, we compared the planning dose with the three accumulated doses, and we calculated local dose variability and dose-volume histogram uncertainties.

  5. Planning the Transition to Long-Term Stewardship for the River Corridor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cearlock, C.S.; Lerch, J.A.; Sands, J.P.

    2007-07-01

    Long-term stewardship refers to all activities necessary to ensure protection of human health and the environment following completion of remediation, disposal, or stabilization of a site or a portion of a site. Efforts to establish the proposed approach and criteria to be met for long-term stewardship in the river corridor of the Hanford Site in Richland, Washington, are currently being established and a draft plan is expected to be completed in mid-2007 to facilitate planning for a smooth and seamless transition to long-term stewardship. Once the initial criteria have been established, supporting information will be gathered as the work proceeds.more » Near the end of cleanup actions under the River Corridor Closure Contract, these criteria will be finalized in a long-term stewardship plan that documents how the criteria have been met. In addition, the final long-term stewardship plan will also contain a proposed Finding of Suitability to Transfer in accordance with Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Section 120(h) [1]. This final long-term stewardship plan will provide the foundation for post-River Corridor Closure Contract and management activities in the river corridor pending actual property transfer from the U.S. Department of Energy. (authors)« less

  6. CyberArc: a non-coplanar-arc optimization algorithm for CyberKnife

    NASA Astrophysics Data System (ADS)

    Kearney, Vasant; Cheung, Joey P.; McGuinness, Christopher; Solberg, Timothy D.

    2017-07-01

    The goal of this study is to demonstrate the feasibility of a novel non-coplanar-arc optimization algorithm (CyberArc). This method aims to reduce the delivery time of conventional CyberKnife treatments by allowing for continuous beam delivery. CyberArc uses a 4 step optimization strategy, in which nodes, beams, and collimator sizes are determined, source trajectories are calculated, intermediate radiation models are generated, and final monitor units are calculated, for the continuous radiation source model. The dosimetric results as well as the time reduction factors for CyberArc are presented for 7 prostate and 2 brain cases. The dosimetric quality of the CyberArc plans are evaluated using conformity index, heterogeneity index, local confined normalized-mutual-information, and various clinically relevant dosimetric parameters. The results indicate that the CyberArc algorithm dramatically reduces the treatment time of CyberKnife plans while simultaneously preserving the dosimetric quality of the original plans.

  7. A Generalized National Planning Approach for Admission Capacity in Higher Education: A Nonlinear Integer Goal Programming Model with a Novel Differential Evolution Algorithm

    PubMed Central

    El-Qulity, Said Ali; Mohamed, Ali Wagdy

    2016-01-01

    This paper proposes a nonlinear integer goal programming model (NIGPM) for solving the general problem of admission capacity planning in a country as a whole. The work aims to satisfy most of the required key objectives of a country related to the enrollment problem for higher education. The system general outlines are developed along with the solution methodology for application to the time horizon in a given plan. The up-to-date data for Saudi Arabia is used as a case study and a novel evolutionary algorithm based on modified differential evolution (DE) algorithm is used to solve the complexity of the NIGPM generated for different goal priorities. The experimental results presented in this paper show their effectiveness in solving the admission capacity for higher education in terms of final solution quality and robustness. PMID:26819583

  8. A Generalized National Planning Approach for Admission Capacity in Higher Education: A Nonlinear Integer Goal Programming Model with a Novel Differential Evolution Algorithm.

    PubMed

    El-Qulity, Said Ali; Mohamed, Ali Wagdy

    2016-01-01

    This paper proposes a nonlinear integer goal programming model (NIGPM) for solving the general problem of admission capacity planning in a country as a whole. The work aims to satisfy most of the required key objectives of a country related to the enrollment problem for higher education. The system general outlines are developed along with the solution methodology for application to the time horizon in a given plan. The up-to-date data for Saudi Arabia is used as a case study and a novel evolutionary algorithm based on modified differential evolution (DE) algorithm is used to solve the complexity of the NIGPM generated for different goal priorities. The experimental results presented in this paper show their effectiveness in solving the admission capacity for higher education in terms of final solution quality and robustness.

  9. The development of an adolescent smoking cessation intervention--an Intervention Mapping approach to planning.

    PubMed

    Dalum, Peter; Schaalma, Herman; Kok, Gerjo

    2012-02-01

    The objective of this project was to develop a theory- and evidence-based adolescent smoking cessation intervention using both new and existing materials. We used the Intervention Mapping framework for planning health promotion programmes. Based on a needs assessment, we identified important and changeable determinants of cessation behaviour, specified change objectives for the intervention programme, selected theoretical change methods for accomplishing intervention objectives and finally operationalized change methods into practical intervention strategies. We found that guided practice, modelling, self-monitoring, coping planning, consciousness raising, dramatic relief and decisional balance were suitable methods for adolescent smoking cessation. We selected behavioural journalism, guided practice and Motivational Interviewing as strategies in our intervention. Intervention Mapping helped us to develop as systematic adolescent smoking cessation intervention with a clear link between behavioural goals, theoretical methods, practical strategies and materials and with a strong focus on implementation and recruitment. This paper does not present evaluation data.

  10. CyberArc: a non-coplanar-arc optimization algorithm for CyberKnife.

    PubMed

    Kearney, Vasant; Cheung, Joey P; McGuinness, Christopher; Solberg, Timothy D

    2017-06-26

    The goal of this study is to demonstrate the feasibility of a novel non-coplanar-arc optimization algorithm (CyberArc). This method aims to reduce the delivery time of conventional CyberKnife treatments by allowing for continuous beam delivery. CyberArc uses a 4 step optimization strategy, in which nodes, beams, and collimator sizes are determined, source trajectories are calculated, intermediate radiation models are generated, and final monitor units are calculated, for the continuous radiation source model. The dosimetric results as well as the time reduction factors for CyberArc are presented for 7 prostate and 2 brain cases. The dosimetric quality of the CyberArc plans are evaluated using conformity index, heterogeneity index, local confined normalized-mutual-information, and various clinically relevant dosimetric parameters. The results indicate that the CyberArc algorithm dramatically reduces the treatment time of CyberKnife plans while simultaneously preserving the dosimetric quality of the original plans.

  11. Migrating data from TcSE to DOORS : an evaluation of the T-Plan Integrator software application.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Post, Debra S.; Manzanares, David A.; Taylor, Jeffrey L.

    2011-02-01

    This report describes our evaluation of the T-Plan Integrator software application as it was used to transfer a real data set from the Teamcenter for Systems Engineering (TcSE) software application to the DOORS software application. The T-Plan Integrator was evaluated to determine if it would meet the needs of Sandia National Laboratories to migrate our existing data sets from TcSE to DOORS. This report presents the struggles of migrating data and focuses on how the Integrator can be used to map a data set and its data architecture from TcSE to DOORS. Finally, this report describes how the bulk ofmore » the migration can take place using the Integrator; however, about 20-30% of the data would need to be transferred from TcSE to DOORS manually. This report does not evaluate the transfer of data from DOORS to TcSE.« less

  12. [Situational profile and intervention strategy in the Mesoamerican region in maternal, neonatal and reproductive health area].

    PubMed

    Hernández-Prado, Bernardo; Kestler, Edgar; Díaz, Juan; Walker, Dilys; Langer, Ana; Lewis, Sarah; De la Vara-Salazar, Elvia; Melo-Zurita, María del Carmen; Iriarte, Emma; Danel, Isabella; Donnay, France; Alemán, Denis; Serrano, Roselyn; Morales, Evelyn; Largaespada, Natalia; González, José Douglas Jarquín; Hernández, Ma Del Carmen; Mejía, Claudia E Quiroz; González, Geneva; Carrera, Yadira; Valverde, Clelia; Luna, Rufino; Valencia-Mendoza, Atanacio; Sosa-Rubí, Sandra G; Hernández-Prado, Bernardo; Kestler, Edgar; Díaz, Juan; Walker, Dilys; Langer, Ana; Lewis, Sarah; De la Vara-Salazar, Elvia; Melo-Zurita, María Del Carmen

    2011-01-01

    To present the main results of the regional situation diagnosis and intervention plan developed in 2010 as part of the planning activities of the Mesoamerican Health System by the Working Group on Maternal, Reproductive and Neonatal Health. A group of experts and representatives from countries in the region (Central America and nine southern Mexican states) conducted an exhaustive review of available data to construct a situational analysis and a review of effective practices for improving maternal, reproductive and neonatal health. Finally, the group proposed a regional action plan, defining regional goals and specific interventions. The situational diagnosis suggests that, although there has been progress in the last 10 years, maternal and neonatal mortality rates are still unnaceptably high in the region, with a substantial variability across countries. The group proposed as a regional goal the reduction of maternal and neonatal mortality in accordance with the Millenium Development Goals. The regional plan recommends specific maternal and neonatal health interventions emphasizing obstetric and neonatal emergency care, skilled birth attendance and family planning. The plan also includes a five year implementation strategy, along with training and evaluation strategies. The regional plan for maternal, neonatal and reproductive health has the potential to be successful, provided it is effectively implemented.

  13. 48 CFR 2.101 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... include the value and size of the modification and the comparative value and size of the final product...

  14. 48 CFR 2.101 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... minor include the value and size of the modification and the comparative value and size of the final...

  15. Evaluating the distributional effects of regional transportation plans and projects : final report.

    DOT National Transportation Integrated Search

    2017-05-01

    Metropolitan planning organizations (MPOs) have long been required to consider the equity implications of their regional transportation plans and processes. Funded by the National Institute for Transportation and Communities, this research aims to pr...

  16. Transit bus stop pedestrian warning application : acceptance test plan : final report.

    DOT National Transportation Integrated Search

    2016-10-14

    This document is the Acceptance Test Plan for the Transit Bus Stop Pedestrian Warning (TSPW) application. This report describes the test and demonstration plan to verify that the application meets its functional and performance requirements.

  17. Integrating intelligent transportation systems within the transportation planning process : an interim handbook.

    DOT National Transportation Integrated Search

    1998-01-01

    The Final Rule on Statewide Planning and Metropolitan Planning issued by the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) in October, 1993 established revised and more comprehensive processes for metropolitan and sta...

  18. Metropolitan planning organizations in Texas : overview and profiles : final report.

    DOT National Transportation Integrated Search

    2017-04-01

    A metropolitan planning organization (MPO) has authority and responsibility for regional transportation planning in urbanized areas where the population is at least 50,000 and surrounding areas meet size/density criteria determined by the U.S. Census...

  19. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... Planning, Environmental Impact Analysis, and Decision- making), the NPS announces the availability of a... National Park Service will execute a Record of Decision (ROD) no sooner than 30 days following publication...

  20. Incentives for nondiscriminatory wellness programs in group health plans. Final rule.

    PubMed

    2013-06-03

    This document contains final regulations, consistent with the Affordable Care Act, regarding nondiscriminatory wellness programs in group health coverage. Specifically, these final regulations increase the maximum permissible reward under a health-contingent wellness program offered in connection with a group health plan (and any related health insurance coverage) from 20 percent to 30 percent of the cost of coverage. The final regulations further increase the maximum permissible reward to 50 percent for wellness programs designed to prevent or reduce tobacco use. These regulations also include other clarifications regarding the reasonable design of health-contingent wellness programs and the reasonable alternatives they must offer in order to avoid prohibited discrimination.

  1. Fly-By-Light/Power-By-Wire Requirements and Technology Workshop

    NASA Technical Reports Server (NTRS)

    Baker, Robert L. (Editor); Pitts, Felix L. (Editor)

    1992-01-01

    The results of the Fly-By-Light/Power-By-Wire (FBL/PBW) Workshop held on March 17-19, 1992, at the NASA Langley Research Center are presented. The FBL/PBW program is a joint NASA LeRC/LaRC effort to develop the technology base for confident application of integrated FBL/PBW systems to transport aircraft. The objectives of the workshop were to ascertain the FBL/PBW program technical requirements and satisfy the requirements and needs from the industry viewpoint, provide a forum for presenting and documenting alternative technical approaches which satisfy the requirements, and assess the plan adequacy in accomplishing plan objectives, aims, and technology transfer. Areas addressed were: optical sensor systems, power-by-wire systems, FBL/PBW fault-tolerant architectures, electromagnetic environment assessment, and system integration and demonstration. The workshop consisted of an introductory meeting, a 'keynote' presentation, a series of individual panel sessions covering the above areas, with midway presentations by the panel chairpersons, followed by a final summarizing/integrating session by the individual panels, and a closing plenary session summarizing the results of the workshop.

  2. US Forest Service and National Park Service Wilderness Aircraft Overflight Study: Sociological background and study plans

    NASA Technical Reports Server (NTRS)

    Harrison, Robin T.; Hartmann, Lawrence

    1990-01-01

    The background and sociological aspects of the combined U.S. Forest Service and National Park Service Wilderness Aircraft Overflight Study (WACOS) are presented. The WACOS broaches a new area of research by combining aspects of outdoor recreation sociology and aircraft noise response studies. The tasks faced create new challenges and require innovative solutions. Background information on the WACOS is presented with special emphasis on sociological considerations. At the time of this writing, no data have yet been collected, so this paper will present background information, related issues, and plans for data collection. Some recent studies indicate that managers of Forest Service wildernesses and National Park Service areas consider aircraft overflights to be a problem to their users in some areas. Additional relevant background research from outdoor recreation sociology is discussed, followed by presentation of the authors' opinions of the most salient sociological issues faced by this study. The goals and desired end products are identified next, followed by a review of the methods anticipated to be used to obtain these results. Finally, a discussion and conclusion section is provided.

  3. Thai-Alberta Co-Operative Assessment Project Concerning Thirty-Two Rural Secondary Schools in the Third National Economic and Social Plan, Thailand (1972-1976). Final Report.

    ERIC Educational Resources Information Center

    Chareonchai, Ruang; And Others

    This extensive assessment project report focuses on the Rural Secondary Schools (RSS) Project in Thailand. The background, design, rationale and objectives of the assessment are described, as are the eight phases of the study: reconnaissance; proposals; basic planning and pre-testing; data collection; analysis; academic review; final report; and…

  4. Final Report for the Arroyo Las Positas Maintenance Impact Study, Lawrence Livermore National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    van Hattem, M; Paterson, L

    2006-01-12

    In 2000, the Lawrence Livermore National Laboratory's (LLNL) Environmental Protection Department, in coordination with Plant Engineering (PE), began dredging sections of the Arroyo Las Positas (ALP) to alleviate concerns about flooding of sensitive facilities within the mainsite of Lawrence Livermore National Laboratory. In order to reduce potential impacts on the federally threatened California red-legged frog (Rana aurora draytonii), LLNL proposed to dredge sections of the ALP in a ''checkerboard pattern'', resulting in a mosaic of open water habitat and vegetated sections (Figure 1). The Arroyo Las Positas Management Plan (Plan) was coordinated with both state and federal agencies including themore » U.S. Fish and Wildlife Service (USFWS), California Department of Fish and Game (CDF&G), San Francisco Regional Water Quality Control Board (SFRWQCB), and the Army Corp of Engineers (ACOE). Water Discharge Requirements (WDRs) were issued for this project on December 30, 1999 (Order No. 99-086) by the SFRWQCB. Provision 19 of the WDRs outlined a five-year (2000 through 2004) Maintenance Impact Study (MIS) that LLNL began in coordination with dredging work that was conducted as part of the Arroyo Las Positas Management Plan. Provision 20 of these WDRs requires LLNL to submit a final report of the results of the Maintenance Impact Study for this project to the SFRWQCB. The purpose of this report is to present the results of the Maintenance Impact Study for Arroyo Las Positas and meet the requirements of Provision 20. A description of the annual monitoring included in this Maintenance Impact Study is included in the methods section of this report. Initially the Plan called for dredging the entire length of the Arroyo Las Positas (approximately 6,981 linear feet) over a 5-year period to minimize temporal impacts on the California red-legged frog. Dredging occurred in 2000 ({approx}1,300 ft.), 2001 ({approx}800 ft.), and 2002 ({approx}1,200 ft.), which constituted approximately 3,300 ft., or roughly half of the entire Plan (Figure 2). Logistical challenges and unanticipated cost influenced the decision to terminate the project prior to completion, and re-evaluate the long-term management goals for the ALP. No dredging was conducted in the final two years of the plan (2003 and 2004).« less

  5. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poderis, Reed J.; King, Rebecca A.

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping,more » tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or documented ? Provides instructions for implementing annual S&M inspections and activities The following facilities that were included in Revision 1 of this plan have reached final disposition and are no longer in the S&M program: ? Reactor Maintenance, Assembly, and Disassembly Facility, Building 25-3110 ? Test Cell A Facility, Building 25-3113 ? TCC Facility, Building 25-3210 ? Pluto Disassembly Facility, Building 26-2201 ? Super Kukla Facility, Building 27-5400« less

  6. A New Strategic Direction for the AAHSLD Annual Statistics: Planning, Service Roles, Performance Measures, and Management Information Systems for Academic Health Science Libraries: Final Report for Phase I.

    ERIC Educational Resources Information Center

    McClure, Charles R.; And Others

    This report presents a summary of activities, findings, and recommendations from Phase I of a project to improve the effectiveness of academic health science libraries and their provision of information services. The objectives for Phase I of the project are given: (1) to identify academic health science library requirements in the areas of…

  7. The New York Adequacy Study: "Determining the Cost of Providing All Children in New York an Adequate Education." Volume 1: Final Report [and] Volume 2: Technical Appendices

    ERIC Educational Resources Information Center

    Chambers, Jay G.; Parrish, Thomas B.; Levin, Jesse D.; Smith, James R.; Guthrie, James W.; Seder, Rich C.; Taylor, Lori

    2004-01-01

    What is the cost of providing all New York public school students a full opportunity to meet the Regents Learning Standards? This report presents the results of a fifteen-month project undertaken jointly by American Institutes for Research (AIR) and Management Analysis and Planning, Inc. (MAP) to answer this question. This is a "costing…

  8. Overview With Results and Lessons Learned of the X-43A Mach 10 Flight

    NASA Technical Reports Server (NTRS)

    Marshall, Laurie A.; Bahm, Catherine; Corpening, Griffin P.; Sherrill, Robert

    2005-01-01

    This paper provides an overview of the final flight of the NASA X-43A project. The project consisted of three flights, two planned for Mach 7 and one for Mach 10. The third and final flight, November 16, 2004, was the first Mach 10 flight demonstration of an airframe-integrated, scramjet-powered, hypersonic vehicle. The goals and objectives for the project as well as those for the third flight are presented. The configuration of the Hyper-X stack including the X-43A, Hyper-X launch vehicle, and Hyper-X research vehicle adapter is discussed. The second flight of the X-43A was successfully conducted on March 27, 2004. Mission differences, vehicle modifications and lessons learned from the second flight as they applied to the third flight are also discussed. An overview of flight 3 results is presented.

  9. Enhancing In-Flight Transoceanic Communications Using Swift-64 Packet Mode Service

    NASA Technical Reports Server (NTRS)

    Slywczak, Richard A.

    2004-01-01

    Current aeronautical communications can be divided into two segments. The first provides state of the art, packet switched technology to the cabin passengers so that they have access to e-mail and web services. The second provides basic circuit switch communication technology to the cockpit, which does not use bandwidth as efficiently as packet switching nor promotes resource sharing. This paper explores the research efforts currently being conducted by the NASA/Glenn Research Center (GRC) for transoceanic communications. The goal is to bring packet mode services to both the cabin and the cockpit of the aircraft and be able to attain benefits by sharing the data link with cabin services. First, this paper will outline the goals of the program and detail the benefits and issues related to this research. We will explain our current laboratory setup and show an architecture implemented in the testbed. Finally, we will present a work plan that will show the progression of research over the next year. This plan will describe a complete cycle from conceptual design and laboratory implementation to the final flight testing.

  10. Comprehensive plan amendment impacts on interchanges in Oregon : final report.

    DOT National Transportation Integrated Search

    2005-09-01

    This report examines the effects of amendments to local comprehensive plans on interchange performance on the Oregon highway system. Plan amendments over a 15-year period in Oregon, resulting in changes to industrial or commercial land use, were revi...

  11. MnDOT Library strategic plan : final report.

    DOT National Transportation Integrated Search

    2017-06-01

    MnDOTs Senior Leadership asked MnDOT Library to develop a Strategic Plan that identifies and reviews the challenges facing the Library over the next five years to better address the evolving needs of the department and users. The strategic plan is...

  12. 78 FR 41694 - Final Priority and Requirements; Education Facilities Clearinghouse

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... the collection and dissemination of best practices for the planning, design, financing, procurement... Facilities Clearinghouse program is to provide technical assistance and training on the planning, design... dissemination of best practices for the planning, design, financing, procurement, construction, improvement...

  13. Retention of Knowledge in Clinical Biochemistry and the Effect of the Keller Plan.

    ERIC Educational Resources Information Center

    Schwartz, Peter L.

    1981-01-01

    A controlled trial of teaching clinical biochemistry by the Keller Plan at the University of Otago Medical School is described. The Keller Plan group performed significantly better than the control group on the final examination. (MLW)

  14. Interim guidance for implementing SAFETEA-LU provisions on planning, environment, and air quality for FHWA authorities

    DOT National Transportation Integrated Search

    2007-02-14

    This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...

  15. 33 CFR 385.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE... Restoration Plan (CERP) means the plan contained in the “Final Integrated Feasibility Report and Programmatic... subsequent modification authorized in law. Comprehensive Plan Modification Report means the report prepared...

  16. 33 CFR 385.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE... Restoration Plan (CERP) means the plan contained in the “Final Integrated Feasibility Report and Programmatic... subsequent modification authorized in law. Comprehensive Plan Modification Report means the report prepared...

  17. 33 CFR 385.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE... Restoration Plan (CERP) means the plan contained in the “Final Integrated Feasibility Report and Programmatic... subsequent modification authorized in law. Comprehensive Plan Modification Report means the report prepared...

  18. 78 FR 65962 - Revision of the Land Management Plan for the Flathead National Forest

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... over time. Under the 2012 Planning Rule, the assessment of ecological, social, and economic trends and... environmental impact statement and revised Forest Plan for public review and comment, and the preparation of the final environmental impact statement and revised Forest Plan. The third stage of the process is...

  19. 75 FR 21341 - Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA AGENCY: Bureau of Reclamation, Interior. ACTION: Notice... adoption of the RMP/GP. The Final EIS/EIR outlines the formulation and evaluation of alternatives designed...

  20. 76 FR 58807 - An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ...: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information-- Release of Final... Protection Planning can Incorporate Climate Change Information, (EPA/600/R-09/142F). The document was... goal of this report is to evaluate where land protection planning can incorporate climate change...

  1. 77 FR 1873 - Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine Particulate Matter 2002...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ...] Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...

  2. 77 FR 12487 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Fine Particulate Matter 2002...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ...] Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...

  3. 77 FR 12724 - Approval and Promulgation of Implementation Plans; Georgia; Macon; Fine Particulate Matter 2002...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ...] Approval and Promulgation of Implementation Plans; Georgia; Macon; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...

  4. Ten-year urban forestry action plan

    Treesearch

    J.W." Jerry" Van Sambeek

    2017-01-01

    The Ten-year Urban Forestry Action Plan: 2016-2026 was published in September, 2015 (see http://www.urbanforestry.subr.edu/FinalActionPlan_Complete_11_17_15.pdf). This 260 page heavily illustrated document was prepared by the National Urban and Community Forestry Advisory Council (NUCFAC) under leadership and funding from the USDA Forest Service. The Plan's...

  5. The EPOS Architecture: Integrated Services for solid Earth Science

    NASA Astrophysics Data System (ADS)

    Cocco, Massimo; Consortium, Epos

    2013-04-01

    The European Plate Observing System (EPOS) represents a scientific vision and an IT approach in which innovative multidisciplinary research is made possible for a better understanding of the physical processes controlling earthquakes, volcanic eruptions, unrest episodes and tsunamis as well as those driving tectonics and Earth surface dynamics. EPOS has a long-term plan to facilitate integrated use of data, models and facilities from existing (but also new) distributed research infrastructures, for solid Earth science. One primary purpose of EPOS is to take full advantage of the new e-science opportunities coming available. The aim is to obtain an efficient and comprehensive multidisciplinary research platform for the Earth sciences in Europe. The EPOS preparatory phase (EPOS PP), funded by the European Commission within the Capacities program, started on November 1st 2010 and it has completed its first two years of activity. EPOS is presently mid-way through its preparatory phase and to date it has achieved all the objectives, milestones and deliverables planned in its roadmap towards construction. The EPOS mission is to integrate the existing research infrastructures (RIs) in solid Earth science warranting increased accessibility and usability of multidisciplinary data from monitoring networks, laboratory experiments and computational simulations. This is expected to enhance worldwide interoperability in the Earth Sciences and establish a leading, integrated European infrastructure offering services to researchers and other stakeholders. The Preparatory Phase aims at leveraging the project to the level of maturity required to implement the EPOS construction phase, with a defined legal structure, detailed technical planning and financial plan. We will present the EPOS architecture, which relies on the integration of the main outcomes from legal, governance and financial work following the strategic EPOS roadmap and according to the technical work done during the first two years in order to establish an effective implementation plan guaranteeing long term sustainability for the infrastructure and the associated services. We plan to describe the RIs to be integrated in EPOS and to illustrate the initial suite of integrated and thematic core services to be offered to the users. We will present examples of combined data analyses and we will address the importance of opening our research infrastructures to users from different communities. We will describe the use-cases identified so far in order to allow stakeholders and potential future users to understand and interact with the EPOS infrastructure. In this framework, we also discuss the global perspectives for data infrastructures in order to verify the coherency of the EPOS plans and present the EPOS contributions. We also discuss the international cooperation initiatives in which EPOS is involved emphasizing the implications for solid Earth data infrastructures. In particular, EPOS and the satellite Earth Observation communities are collaborating in order to promote the integration of data from in-situ monitoring networks and satellite observing systems. Finally, we will also discuss the priorities for the third year of activity and the key actions planned to better involve users in EPOS. In particular, we will discuss the work done to finalize the design phase as well as the activities to start the validation and testing phase of the EPOS infrastructure.

  6. Making a successful transition to cash balance. Using employee choice and financial education.

    PubMed

    Scahill, P; Wiley, P

    2000-01-01

    As employee work patterns change, the need for flexible plan design has increased. Hybrid plans such as cash balance plans offer a plan design variation that incorporates elements of the traditional defined benefit plan as well as those of defined contribution plans. This article examines plan design trends and discusses both negative and positive reactions to those trends. Finally, the solution of offering choice to plan participants is suggested, and the issues that must be considered are discussed.

  7. Computer Aided Process Planning (CAPP): The User Interface for the Fabrication Module of the Rapid Design System

    DTIC Science & Technology

    1991-01-01

    plan. The Fabrication Planning Module automatically creates a plan using information from the Feature Based Design Environment (FBDE) of the RDS. It...llll By using the user Interface, the final process plan can be modified in many different ways. The translation of a design feature to a more...for the review and modification of a process plan. The Fabrication Planning Module automatically creates a plan using information from the Feature Based

  8. 76 FR 64085 - Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... power allocation. SUMMARY: The Western Area Power Administration (Western), a Federal power marketing..., Final Power Allocation developed under the requirements of subpart C-Power Marketing Initiative of the Energy Planning and Management Program (Program) Final Rule, 10 CFR part 905. These final power...

  9. Standard and Nonstandard Craniospinal Radiotherapy Using Helical TomoTherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parker, William, E-mail: william@medphys.mcgill.c; Brodeur, Marylene; Roberge, David

    2010-07-01

    Purpose: To show the advantages of planning and delivering craniospinal radiotherapy with helical TomoTherapy (TomoTherapy Inc., Madison, WI) by presenting 4 cases treated at our institution. Methods and Materials: We first present a standard case of craniospinal irradiation in a patient with recurrent myxopapillary ependymoma (MPE) and follow this with 2 cases requiring differential dosing to multiple target volumes. One of these, a patient with recurrent medulloblastoma, required a lower dose to be delivered to the posterior fossa because the patient had been previously irradiated to the full dose, and the other required concurrent boosts to leptomeningeal metastases as partmore » of his treatment for newly diagnosed MPE. The final case presented is a patient with pronounced scoliosis who required spinal irradiation for recurrent MPE. Results: The four cases presented were planned and treated successfully with Helical Tomotherapy. Conclusions: Helical TomoTherapy delivers continuous arc-based intensity-modulated radiotherapy that gives high conformality and excellent dose homogeneity for the target volumes. Increased healthy tissue sparing is achieved at higher doses albeit at the expense of larger volumes of tissue receiving lower doses. Helical TomoTherapy allows for differential dosing of multiple targets, resulting in very elegant dose distributions. Daily megavoltage computed tomography imaging allows for precision of patient positioning, permitting a reduction in planning margins and increased healthy tissue sparing in comparison with standard techniques.« less

  10. 78 FR 13405 - Patient Protection and Affordable Care Act; Health Insurance Market Rules; Rate Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ...This final rule implements provisions related to fair health insurance premiums, guaranteed availability, guaranteed renewability, single risk pools, and catastrophic plans, consistent with title I of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010, referred to collectively as the Affordable Care Act. The final rule clarifies the approach used to enforce the applicable requirements of the Affordable Care Act with respect to health insurance issuers and group health plans that are non-federal governmental plans. This final rule also amends the standards for health insurance issuers and states regarding reporting, utilization, and collection of data under the federal rate review program, and revises the timeline for states to propose state- specific thresholds for review and approval by the Centers for Medicare & Medicaid Services (CMS).

  11. 78 FR 15011 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ..., Final EIS, DOE, TX, W.A. Parish Post-Combustion CO 2 Capture and Sequestration Project, Review Period.... 20130055, Final EIS, NPS, IA, Effigy Mounds National Monument Final General Management Plan, Review Period...] BILLING CODE 6560-50-P ...

  12. NOAA Gulf Spill Restoration |

    Science.gov Websites

    Plan, Focusing on Recreational Use and Nutrient Reduction Louisiana Trustees Release Fourth Draft Restoration Plan, Focusing on Recreational Use and Nutrient Reduction Read More... Florida Trustee Implementation Group Releases Phase V.2 Final Restoration Plan Florida Trustee Implementation Group Releases

  13. European Perceptions of Plan Colombia: A Virtual Contribution to a Virtual War and Peace Plan?

    DTIC Science & Technology

    2001-05-01

    government for more effective control of the paramilitary forces may help. A greater surge of European activism backed by development assistance funds and...economic, security, and political spillover effects for neighboring countries. Finally and logically, the author reflects the European concern that...economic, security, and political spillover effects for neighboring countries. Finally and logically, Roy reflects the European concern that whatever

  14. From Welfare to Work: Dynamic Lesson Plans for ESL Learners. Final Report. Fiscal Year 1998-99 [and] From Welfare to Work: Lessons for ESL Learners.

    ERIC Educational Resources Information Center

    Center for Literacy, Inc., Philadelphia, PA.

    This document combines a final project report and the resulting guidebook of 20 lesson plans for English as a second language (ESL) instructors to help learners work within the Temporary Assistance to Needy Families (TANF) system and acquire effective job readiness strategies, choose a career path, and pursue employment. The report describes the…

  15. Personal pervasive environments: practice and experience.

    PubMed

    Ballesteros, Francisco J; Guardiola, Gorka; Soriano, Enrique

    2012-01-01

    In this paper we present our experience designing and developing two different systems to enable personal pervasive computing environments, Plan B and the Octopus. These systems were fully implemented and have been used on a daily basis for years. Both are based on synthetic (virtual) file system interfaces and provide mechanisms to adapt to changes in the context and reconfigure the system to support pervasive applications. We also present the main differences between them, focusing on architectural and reconfiguration aspects. Finally, we analyze the pitfalls and successes of both systems and review the lessons we learned while designing, developing, and using them.

  16. Personal Pervasive Environments: Practice and Experience

    PubMed Central

    Ballesteros, Francisco J.; Guardiola, Gorka; Soriano, Enrique

    2012-01-01

    In this paper we present our experience designing and developing two different systems to enable personal pervasive computing environments, Plan B and the Octopus. These systems were fully implemented and have been used on a daily basis for years. Both are based on synthetic (virtual) file system interfaces and provide mechanisms to adapt to changes in the context and reconfigure the system to support pervasive applications. We also present the main differences between them, focusing on architectural and reconfiguration aspects. Finally, we analyze the pitfalls and successes of both systems and review the lessons we learned while designing, developing, and using them. PMID:22969340

  17. Space Shuttle Avionics: a Redundant IMU On-Board Checkout and Redundancy Management System

    NASA Technical Reports Server (NTRS)

    Mckern, R. A.; Brown, D. G.; Dove, D. W.; Gilmore, J. P.; Landey, M. E.; Musoff, H.; Amand, J. S.; Vincent, K. T., Jr.

    1972-01-01

    A failure detection and isolation philosophy applicable to multiple off-the-shelf gimbaled IMUs are discussed. The equations developed are implemented and evaluated with actual shuttle trajectory simulations. The results of these simulations are presented for both powered and unpowered flight phases and at operational levels of four, three, and two IMUs. A multiple system checkout philosophy is developed and simulation results presented. The final task develops a laboratory test plan and defines the hardware and software requirements to implement an actual multiple system and evaluate the interim study results for space shuttle application.

  18. Updated Review of Planetary Atmospheric Electricity

    NASA Astrophysics Data System (ADS)

    Yair, Y.; Fischer, G.; Simões, F.; Renno, N.; Zarka, P.

    2008-06-01

    This paper reviews the progress achieved in planetary atmospheric electricity, with focus on lightning observations by present operational spacecraft, aiming to fill the hiatus from the latest review published by Desch et al. (Rep. Prog. Phys. 65:955 997, 2002). The information is organized according to solid surface bodies (Earth, Venus, Mars and Titan) and gaseous planets (Jupiter, Saturn, Uranus and Neptune), and each section presents the latest results from space-based and ground-based observations as well as laboratory experiments. Finally, we review planned future space missions to Earth and other planets that will address some of the existing gaps in our knowledge.

  19. Updated Review of Planetary Atmospheric Electricity

    NASA Astrophysics Data System (ADS)

    Yair, Y.; Fischer, G.; Simões, F.; Renno, N.; Zarka, P.

    This paper reviews the progress achieved in planetary atmospheric electricity, with focus on lightning observations by present operational spacecraft, aiming to fill the hiatus from the latest review published by Desch et al. (Rep. Prog. Phys. 65:955-997, 2002). The information is organized according to solid surface bodies (Earth, Venus, Mars and Titan) and gaseous planets (Jupiter, Saturn, Uranus and Neptune), and each section presents the latest results from space-based and ground-based observations as well as laboratory experiments. Finally, we review planned future space missions to Earth and other planets that will address some of the existing gaps in our knowledge.

  20. Cassini Operational Sun Sensor Risk Management During Proximal Orbit Saturn Ring Plane Crossings

    NASA Technical Reports Server (NTRS)

    Bates, David M.

    2016-01-01

    NASA's Cassini Spacecraft, launched on October 15th, 1997 which arrived at Saturn on June 30th, 2004, is the largest and most ambitious interplanetary spacecraft in history. As the first spacecraft to achieve orbit at Saturn, Cassini has collected science data throughout its four-year prime mission (2004–08), and has since been approved for a first and second extended mission through 2017. As part of the final extended missions, Cassini will begin an aggressive and exciting campaign of high inclination, low altitude flybys within the inner most rings of Saturn, skimming Saturn’s outer atmosphere, until the spacecraft is finally disposed of via planned impact with the planet. This final campaign, known as the proximal orbits, requires a strategy for managing the Sun Sensor Assembly (SSA) health, the details of which are presented in this paper.

Top