Sample records for prime contractor implementation

  1. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    NASA Technical Reports Server (NTRS)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.

  2. 48 CFR 45.501 - Prime contractor alternate locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  3. 75 FR 43166 - Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ...] Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients AGENCY: Office... information collection requirement regarding Central Contractor Registration Requirements for Prime Grant... for the proper performance of functions of the Central Contractor Registration Requirements for Prime...

  4. 13 CFR 125.3 - What types of subcontracting assistance are available to small businesses?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... controlled by women. The subcontracting assistance program implements section 8(d) of the Small Business Act... percentage of total contract dollars. (3) A prime contractor has a history of unjustified untimely or reduced... disadvantaged business, or women-owned small business; and (ix) As a best practice, the contractor may provide...

  5. 48 CFR 49.108-2 - Prime contractor's rights and obligations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor's rights and obligations. 49.108-2 Section 49.108-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-2 Prime contractor's rights...

  6. 40 CFR 35.938-6 - Progress payments to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Progress payments to contractors. 35... § 35.938-6 Progress payments to contractors. (a) Policy. EPA policy is that, except as State law otherwise provides, grantees should make prompt progress payments to prime contractors and prime contractors...

  7. 48 CFR 32.504 - Subcontracts under prime contracts providing progress payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor shall not delete the references to “Contracting Officer” and “Government” in adapting paragraph (g... “Contracting Officer” may be changed to “Contracting Officer or Prime Contractor.” (ii) The term “the Government” may be changed to “the Government or Prime Contractor.” (3) The subcontract special terms...

  8. Issues with Access to Acquisition Data and Information in the Department of Defense: A Closer Look at the Origins and Implementation of Controlled Unclassified Information Labels and Security Policy

    DTIC Science & Technology

    2016-12-01

    at a high cost and is protected by contractual agreements between vendors and the government. Yet indiscriminate labeling of information as...federally funded research and development centers [FFRDCs], information technology [IT] support, or other contractor support). Proprietary...con- tractor originators of the information (prime contractors and subcontractors), the government, and nongovernmental entities assisting the

  9. Issues with Access to Acquisition Data and Information in the Department of Defense: A Closer Look at the Origins and Implementation of Controlled Unclassified Information Labels and Security Policy

    DTIC Science & Technology

    2016-12-19

    at a high cost and is protected by contractual agreements between vendors and the government. Yet indiscriminate labeling of information as...federally funded research and development centers [FFRDCs], information technology [IT] support, or other contractor support). Proprietary...con- tractor originators of the information (prime contractors and subcontractors), the government, and nongovernmental entities assisting the

  10. Searching for Contracting Patterns over Time: Do Prime Contractor and Subcontractor Relations Follow Similar Patterns for Professional Services Provision?

    ERIC Educational Resources Information Center

    Ponomariov, Branco; Kingsley, Gordon; Boardman, Craig

    2011-01-01

    This paper compares over a 12-year period (1) patterns of contracting between a state transportation agency and its prime contractors providing engineering design services with (2) patterns between these prime contractors and their subcontractors. We find evidence of different contracting patterns at each level that emerge over time and coexist in…

  11. 75 FR 22805 - Submission for OMB Review; American Recovery and Reinvestment Act-Quarterly Reporting for Prime...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Recovery and Reinvestment Act--Quarterly Reporting for Prime Contractors AGENCIES: Department of Defense... Reinvestment Act--Quarterly Reporting for Prime Contractors published in the Federal Register is being...

  12. Liabilities and Responsibilities of the Construction Manager for Implementation and Management of the Safety Program.

    DTIC Science & Technology

    1987-12-01

    acting as an agent of the owner, and the owner contracts directly with several prime or trade contractors. There are four different agreements associated...safety precautions and programs in connection with the project or for the construction manager’s obligations as the agent of the owner. AIA A201/CM...require the general contractor to exercise reasonable care for safety of the subcontractor’s employees. Owners and their agents must be careful that

  13. 78 FR 54252 - Information Collection; American Recovery and Reinvestment Act-Reporting Requirements-One Time...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... Contractors AGENCY: Department of Defense (DOD), General Services Administration (GSA), and National... Requirements for Prime Contractors. DATES: Submit comments on or before November 4, 2013. ADDRESSES: Submit... Requirements-- One Time Reporting Requirements for Prime Contractors, by any of the following methods...

  14. Littoral Combat Ship and Frigate: Congress Faced with Critical Acquisition Decisions

    DTIC Science & Technology

    2016-12-01

    D.C.: Mar. 1, 2005). 3Lockheed Martin is the prime contractor for LCS 1 and the odd numbered seaframes. For LCS 2 and LCS 4, General Dynamics was...the prime contractor for the Austal USA built ships. General Dynamics and Austal USA ended their teaming arrangement in 2010. Austal USA is the...prime contractor for the remaining even-numbered seaframes. The Course of the LCS Program Has Changed Significantly over Time Page 3 GAO

  15. 75 FR 17919 - Submission for OMB Review; American Recovery and Reinvestment Act-One-time Reporting Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... Recovery and Reinvestment Act--One-time Reporting Requirements for Prime Contractors AGENCY: Department of... requirement concerning the American Recovery and Reinvestment Act--One-time Reporting Requirements for Prime... Act--One-time Reporting Requirements for Prime Contractors, in all correspondence. FOR FURTHER...

  16. Navy Virginia (SSN 774) Class Attack Submarine Procurement: Background and Issues for Congress

    DTIC Science & Technology

    2016-10-25

    proposed plan include the following:  GD/EB is to be the prime contractor for designing and building Ohio replacement boats;  HII/NNS is to be a...boats, and HII/NNS would receive 22%-23%;  GD/EB is to continue as prime contractor for the Virginia-class program, but to help balance out projected...execute this strategy, GDEB has been selected as the prime contractor for OR with the responsibilities to deliver the twelve OR [Ohio replacement

  17. 76 FR 68044 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-54; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... implements revisions made by the Small Business Administration (SBA) in its Small Disadvantaged Business (SDB..., to allow SDBs to self-represent their SDB status to prime contractors in good faith when seeking Federal subcontracting opportunities. This FAR revision removed an administrative burden for SDB...

  18. Technology transfer from the viewpoint of a NASA prime contractor

    NASA Technical Reports Server (NTRS)

    Dyer, Gordon

    1992-01-01

    Viewgraphs on technology transfer from the viewpoint of a NASA prime contractor are provided. Technology Transfer Program for Manned Space Systems and the Technology Transfer Program status are addressed.

  19. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime... the subcontract for any reason, the recipient must require the prime contractor to employ the six good...

  20. 48 CFR 1019.202-70-5 - Incentives for prime contractor participation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for prime contractor participation. (a) Under the Small Business Act, 15 U.S.C. 637(d)(4)(E), Treasury.../management factors. (b) A mentor's performance will be evaluated against the criteria described in DTAR 1052... contracts as a factor in determining contractor responsibility under FAR 19.705-5(a)(1). (d) Mentor-protégé...

  1. 75 FR 22805 - Submission for OMB Review; American Recovery and Reinvestment Act-One-Time Reporting Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Recovery and Reinvestment Act--One-Time Reporting Requirements for Prime Contractors AGENCIES: Department... Recovery and Reinvestment Act--One-time Reporting Requirements for Prime Contractors published in the...

  2. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for Research, Development, Test, and Evaluation, Fiscal Year 1987.

    DTIC Science & Technology

    1987-01-01

    Headquarters Services Directorate for Information Operations and Reports D) ,( /NT IS lientitra on nn Iber for hIs bh act& r, s (i0 ’F H 7 FOREWORD 500...This report provides information on the 500 contractors that received the largest dollar volume in Department of Defense (DOD) prime contract awards... report presents summary data on the 500 prime contractors receiving the largest dollar volume in Department of Defense (DOD) awards over $25,000 for

  3. Lessons Learned from a Tryout of Spanish and English Versions of a State Assessment.

    ERIC Educational Resources Information Center

    Stansfield, Charles W.; Kahl, Stuart R.

    The Massachusetts Comprehensive Assessment System (MCAS) is the new Massachusetts state assessment program that is being implemented in response to state education reform legislation. The paper describes the early efforts of the state Department of Education (MDOE), its prime contractor for development of the MCAS (Advanced Systems in Measurement…

  4. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  5. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  6. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  7. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  8. 48 CFR 52.203-7 - Anti-Kickback Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Anti-Kickback Procedures. 52.203-7 Section 52.203-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... indirectly, to any prime Contractor, prime Contractor employee, subcontractor, or subcontractor employee for...

  9. 48 CFR 52.203-7 - Anti-Kickback Procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Anti-Kickback Procedures. 52.203-7 Section 52.203-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... indirectly, to any prime Contractor, prime Contractor employee, subcontractor, or subcontractor employee for...

  10. 48 CFR 52.203-7 - Anti-Kickback Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Anti-Kickback Procedures. 52.203-7 Section 52.203-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... indirectly, to any prime Contractor, prime Contractor employee, subcontractor, or subcontractor employee for...

  11. 48 CFR 3052.219-72 - Evaluation of prime contractor participation in the DHS mentor-protégé program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor participation in the DHS mentor-protégé program. 3052.219-72 Section 3052.219-72 Federal... Evaluation of prime contractor participation in the DHS mentor-protégé program. As prescribed in (HSAR) 48... the DHS Mentor-Protégé Program (JUN 2006) This solicitation contains a source selection factor or...

  12. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.

  13. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors. Decatur Mayor Tab Bowling greets David Brock.

  14. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts. MSFC Director Todd May shares opening remarks.

  15. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. Decatur Mayor Tab Bowling welcomes attendees.

  16. Government - Prime Contractor - Subcontractor Relationships: An Analysis.

    DTIC Science & Technology

    1979-12-01

    contract, prime contractor frustration and animosity due to over zealous 122 JAM ,- Government managers, and subcontractor problems of "over- reach" and...Journal, Vol. 12, No. 2,Second Quarter, 1978. 41. Singer, N.P., "The Unheard of Standard Set of Sub- contract Terms and Conditions - As Easy as Pumpkin Pie

  17. 48 CFR 49.104 - Duties of prime contractor after receipt of notice of termination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Duties of prime contractor after receipt of notice of termination. 49.104 Section 49.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.104...

  18. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  19. 48 CFR 9.604 - Limitations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...

  20. 48 CFR 9.604 - Limitations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...

  1. 48 CFR 9.604 - Limitations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...

  2. 48 CFR 9.604 - Limitations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...

  3. 48 CFR 9.604 - Limitations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...

  4. 48 CFR 719.273-3 - Incentives for prime contractor participation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Development (USAID) Mentor-Protégé Program 719.273-3 Incentives for prime contractor participation. (a... provides additional guidance. (b) Costs incurred by a Mentor to provide developmental assistance, as... reimbursable as a direct cost under a USAID contract. If USAID is the mentor's responsible audit agency under...

  5. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  6. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  7. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  8. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Prime contractor performance requirements (limitations on subcontracting). 125.6 Section 125.6 Business Credit and Assistance SMALL BUSINESS... subcontracting). (a) In order to be awarded a full or partial small business set-aside contract, an 8(a) contract...

  9. David Brock addresses the "How to Launch Your Business with NASA" forum.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. David Brock, head of Marshall's Small Business Office talks about doing business with Marshall.

  10. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts. MSFC Director Todd May and Decatur Mayor Tab Bowling enjoy a light moment.

  11. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. OSAC Director Johnny Stephenson talks about Marshall's Mission areas to audience

  12. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors. Decatur Mayor Tab Bowling chats with NASA retiree Don Odum

  13. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. City of Hartselle Mayor Randy Garrison welcomes attendees to conference.

  14. P-8A Poseidon Multi-Mission Maritime Aircraft (P-8A)

    DTIC Science & Technology

    2013-12-01

    NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND...2013 rated the P-8A as operationally effective , operationally suitable, and recommended Fleet introduction. Integrated testing of deficiency...lot through effective negotiations with the prime contractor and through development and implementation of production process improvement

  15. JCL Implementation On A Human Spaceflight Program

    NASA Technical Reports Server (NTRS)

    Kulpa, Vyga; Karpowich, Mike; Abel, Diana; Archiable, Wes; Carson, William

    2013-01-01

    Joint Confidence Level (JCL) analysis focuses on the integration of traditionally stove-piped programmatic components (schedule, cost and risk) to establish projected resource and schedule requirements at various confidence levels and to identify programmatic cost and schedule risk drivers. SLS Program consists of multiple Prime Contractors managed by independent SLS Elements which are integrated using SE&I and Program Management. SLS further integrates with GSDO and MPCV through ESD integrated working groups.

  16. 78 FR 79455 - Information Collection; System for Award Management Registration Requirements for Prime Grant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ...Under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), the Regulatory Secretariat Division will be submitting to the Office of Management and Budget (OMB) a request to review and approve a renewal of the currently approved information collection requirement regarding the pre-award registration requirements for Prime Grant Recipients. The title of the approved information collection is Central Contractor Registration Requirements for Prime Grant Recipients (OMB Control Number 3090-0290). The updated information collection title, based on the migration of the Central Contractor Registration system to the System for Award Management in late July 2012, is System for Award Management Registration Requirements for Prime Grant Recipients.

  17. 48 CFR 32.110 - Payment of subcontractors under cost-reimbursement prime contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... under cost-reimbursement prime contracts. 32.110 Section 32.110 Federal Acquisition Regulations System... Purchase Financing 32.110 Payment of subcontractors under cost-reimbursement prime contracts. If the contractor makes financing payments to a subcontractor under a cost-reimbursement prime contract, the...

  18. KSC-2010-5283

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer walk through the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  19. KSC-2010-5281

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer walk through the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  20. KSC-2010-5280

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer attend the opening ceremonies of the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  1. KSC-2010-5282

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer walk through the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  2. KSC-2010-5284

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer walk through the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  3. Subcontracting Management Handbook

    DTIC Science & Technology

    1988-05-01

    nature Government involvement with subcontracto-s must be channeled through C.. 4prime contractor directed acti’ities. Thus. onlN the prime contractor...ae’quisit~o:3 and seconcily, ,.._ 12.* Logistics Cons’sdera- t4vocias shall ,emrforri acquixtiou p’’nn~rg and tiofls rojiduct market , suveys for i..l...quantities, and (8) Other factors such as future requirements, engineering, tooling, start- * work determined by the contracting ing load costs, market

  4. Counterfeit Parts: DOD Needs to Improve Reporting and Oversight to Reduce Supply Chain Risk

    DTIC Science & Technology

    2016-02-01

    the cost accounting standards board under 41 U.S.C. § 1502. 8DOD implemented its cost principle that costs are not allowable unless 1) the...February 2016 GAO-16-236 United States Government Accountability Office United States Government Accountability Office Highlights of GAO-16-236, a...apply to prime contractors subject to cost accounting standards on acquisitions other than small business set-asides. The cost accounting standards are

  5. Establishing a Product Baseline for Global Positioning System Satellites through Functional and Physical Configuration Audits

    DTIC Science & Technology

    2011-09-01

    PBL may see changes as the design is actually implemented . Such changes are typically for practical reasons of adapting to either specific...shall use a configuration management approach to establish and control product attributes and the product baseline across the total system life cycle... practice that helps prevent government interference in subcontracts, holds the prime contractor accountable for their end product (s), limits the potential

  6. California’s Shrinking Defense Contractors: Effects on Small Suppliers,

    DTIC Science & Technology

    1996-01-01

    They did not physically segregate any parts of their operations or set up a separate data management system to do business with prime contractors...of them out of business . * Small defense aerospace suppliers are not making cutting-edge products for commercial customers. Small defense aerospace...are considered critical to their primes’ supplier base are concerned. Most Firms Are Still in Business When we checked with a random sample of small

  7. Total Quality Management in Space Shuttle Main Engine manufacturing

    NASA Technical Reports Server (NTRS)

    Ding, J.

    1992-01-01

    The Total Quality Management (TQM) philosophy developed in the Marshall Space Flight Center (MSFC) is briefly reviewed and the ongoing TQM implementation effort which is being pursued through the continuous improvement (CI) process is discussed. TQM is based on organizational excellence which integrates the new supportive culture with the technical tools necessary to identify, assess, and correct manufacturing processes. Particular attention is given to the prime contractor's change to the organizational excellence management philosophy in SSME manufacturing facilities.

  8. NASTRAN users' experience of Avco Aerostructures Division

    NASA Technical Reports Server (NTRS)

    Blackburn, C. L.; Wilhelm, C. A.

    1973-01-01

    The NASTRAN experiences of a major structural design and fabrication subcontractor that has less engineering personnel and computer facilities than those available to large prime contractors are discussed. Efforts to obtain sufficient computer capacity and the development and implementation of auxiliary programs to reduce manpower requirements are described. Applications of the NASTRAN program for training users, checking out auxiliary programs, performing in-house research and development, and structurally analyzing an Avco designed and manufactured missile case are presented.

  9. All Prime Contract Awards by State or Country, Place, and Contractor, FY 84. Part 1 (Antigua - Zaire).

    DTIC Science & Technology

    1984-01-01

    AD-RI65 86 ALL PRIME CONTRACT AWARDS BY STATE OR COUNTRY PLACE AND 1/ 9 CONTRACTOR FY 84, (U) WA HINGTON HEADQUARTERS SERVICES (DOD) DC DIRECTORATE...ISPONSORING I8b. OFFICE SYMBOL 9 . PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER *ORGANIZATION I (if applicable) 8c ADDRESS (City, State, and ZIP Code) 10...number) FIELD GROUP SUB-GROUP 9 . ABSTRACT (Continue on reverse if necessary and identify by block number) ....- 00 E / ELEGT F . _,0 ISTRIBUITION

  10. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 7: PEP logistics and training plan requirements

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Recommendations for logistics activities and logistics planning are presented based on the assumption that a system prime contractor will perform logistics functions to support all program hardware and will implement a logistics system to include the planning and provision of products and services to assure cost effective coverage of the following: maintainability; maintenance; spares and supply support; fuels; pressurants and fluids; operations and maintenance documentation training; preservation, packaging and packing; transportation and handling; storage; and logistics management information reporting. The training courses, manpower, materials, and training aids required will be identified and implemented in a training program.

  11. Air Force B-21 Long Range Strike Bomber

    DTIC Science & Technology

    2016-04-14

    and B - 52 bombers, and would possibly replace B -2s in the future. B -21 development was highly classified until the summer of 2015, when the Air Force...Air Force had indicated that its fleet of B -1, B -2, and B - 52 bombers would suffice until 2037, when advanced technologies, such as hypersonic cruise...was the prime contractor for the B -1. Boeing was the prime contractor for the B - 52 . From FY2004 to FY2009, DOD requested more than $1.4 billion in the

  12. Design Criteria for Controlling Stress Corrosion Cracking

    NASA Technical Reports Server (NTRS)

    Franklin, D. B.

    1987-01-01

    This document sets forth the criteria to be used in the selection of materials for space vehicles and associated equipment and facilities so that failure resulting from stress corrosion will be prevented. The requirements established herein apply to all metallic components proposed for use in space vehicles and other flight hardware, ground support equipment, and facilities for testing. These requirements are applicable not only to items designed and fabricated by MSFC (Marshall Space Flight Center) and its prime contractors, but also to items supplied to the prime contractor by subcontractors and vendors.

  13. 48 CFR 48.102 - Policies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... systems research and development except where the contracting officer determines and documents the file to... prime contractor has demonstrated an effective VE program during either earlier program phases, or...: (1) Extent of the change. (2) Complexity of the change. (3) Development risk (e.g., contractor's...

  14. 48 CFR 52.203-7 - Anti-Kickback Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Anti-Kickback Procedures. 52.203-7 Section 52.203-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Contractor, prime Contractor employee, subcontractor, or subcontractor employee for the purpose of improperly...

  15. JUICE: A European mission to explore the emergence of habitable worlds around gas giants

    NASA Astrophysics Data System (ADS)

    Witasse, O.

    2017-09-01

    JUICE - JUpiter ICy moons Explorer - is the first large mission in the ESA Cosmic Vision 2015-2025 programme. The mission was selected in May 2012 and adopted in November 2014. The implementation phase started in July 2015, following the selection of the prime industrial contractor, Airbus Defense and Space (Toulouse, France). Due to launch in June 2022 and arrival at Jupiter in October 2029, it will spend at least three ½ years making detailed observations of Jupiter and three of its largest moons, Ganymede, Callisto and Europa.

  16. 48 CFR 207.171-3 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... it is anticipated that a prime contract will be awarded without adequate price competition, and the prime contractor is expected to acquire any component without adequate price competition, the agency... price competition, the agency shall consider breakout of the component if substantial net cost savings...

  17. Near-Term Electric Vehicle Program. Phase II: Mid-Term Summary Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1978-08-01

    The Near Term Electric Vehicle (NTEV) Program is a constituent elements of the overall national Electric and Hybrid Vehicle Program that is being implemented by the Department of Energy in accordance with the requirements of the Electric and Hybrid Vehicle Research, Development, and Demonstration Act of 1976. Phase II of the NTEV Program is focused on the detailed design and development, of complete electric integrated test vehicles that incorporate current and near-term technology, and meet specified DOE objectives. The activities described in this Mid-Term Summary Report are being carried out by two contractor teams. The prime contractors for these contractormore » teams are the General Electric Company and the Garrett Corporation. This report is divided into two discrete parts. Part 1 describes the progress of the General Electric team and Part 2 describes the progress of the Garrett team.« less

  18. 48 CFR 22.406-9 - Withholding from or suspension of contract payments.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Standards for Contracts Involving Construction 22.406-9 Withholding from or suspension of contract payments... contract with the same prime contractor that is subject to either Construction Wage Rate Requirements... contractor or subcontractor fails or refuses to comply with the labor standards clauses of the Construction...

  19. Alphabetic List of All DoD Prime Contractors (No Dollars), FY83.

    DTIC Science & Technology

    1983-01-01

    AIRCRAFT PARTS INC UNIVERSAL LINER OF NEW MEXICO INC UNIVERSITY FACULTY ASSOCIATES UNIVERSAL APPLICATORS INC UNIVERSAL LOGISTICS CORP UNIVERSITY MICROFILMS...LTD UNIVERSAL ASPHALT PAVING CO INC UNIVERSAL LUSITANIA MFG CORP UNIVERSITY OF HEALTH SCIENCES THE CONTRACTORS RECEIVING CONTRACTS OF S25,000 OR MORE

  20. NASA Office of Small and Disadvantaged Business Utilization

    NASA Technical Reports Server (NTRS)

    2001-01-01

    The Office of Small and Disadvantaged Business Utilization (OSDBU) within NASA promotes the utilization of small, disadvantaged, and women-owned small businesses in compliance with Federal laws, regulations, and policies. We assist such firms in obtaining contracts and subcontracts with NASA and its prime contractors. The OSDBU also facilitates the participation of small businesses in NASA's technology transfer and commercialization activities. Our driving philosophy is to consider small businesses as our products. Our customers are the NASA Enterprises, Field Centers, Functional Staff Offices, major prime contractors, and other large institutions. We hone the skills of our products to make them marketable to our customers in the performance of NASA missions.

  1. 75 FR 17919 - Submission for OMB Review; American Recovery and Reinvestment Act-Quarterly Reporting for Prime...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Recovery and Reinvestment Act--Quarterly Reporting for Prime Contractors AGENCY: Department of Defense (DOD... cumulative amount from all the reports submitted for this action will be maintained by the government's on...

  2. Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farmer, Carl J.

    Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

  3. Supplier Assessment System (SAS)

    NASA Technical Reports Server (NTRS)

    Dietrich, Kristen

    2016-01-01

    Background: Sponsored by NASA Headquarters; Charter - provide information to assist the quality assurance community in evaluating and determining supplier risk; Comprehensive on-line repository of supplier information; Available to approved civil service personnel from all NASA Centers, other U.S. Government Agencies, Prime Contractors, and NASA direct support contractors; User access to specific data types or documents is controlled as needed.

  4. 48 CFR 252.209-7007 - Prohibited Financial Interests for Lead System Integrators.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor for the development or production of a major system, if the prime contractor is not expected at the time of award to perform a substantial portion of the work on the system and the major subsystems... for the procurement of services, the primary purpose of which is to perform acquisition functions...

  5. 76 FR 11363 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... management and oversight of a program or effort (rather than to directly furnish an end item or service to... prime contractor or any such first-tier subcontractor in furnishing end items or services of the type.... 2320, which applies to technical data, but not to computer software (which is expressly excluded from...

  6. 48 CFR 519.7004 - Incentives for prime contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7004 Incentives for prime...) Costs incurred by a mentor to provide developmental assistance, as described in section 519.7012 to... under a GSA contract. If GSA is the mentor's responsible audit agency under FAR 42.703-1, GSA will...

  7. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...

  8. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...

  9. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...

  10. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...

  11. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Exhibitors answer questions at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  12. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Information from NASA's Tech Transfer Office is on display at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  13. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    An exhibitor answers questions at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  14. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Attendees visit exhibitor booths at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  15. Strategic Management of Resource Markets: An Exploratory Study of Department of Defense Contractors.

    DTIC Science & Technology

    1982-04-01

    prime contractors focusing on (1) the operation and functional content of strategic management systems and their approaches to identifying, prioritizing...Introduction Strategic Planning for Procurement Approaches to Strategic Planning Relationship with the Procurement Process Organizational Demands Studies...planning/management with the same skill, content and commitment, what suggested improvements can come from a study of the approaches used by the more

  16. Acquisition Research Topics Catalog.

    DTIC Science & Technology

    1979-01-01

    tion maintenance, and redistribution Control levels based on standard formu- and marketing ) impact the acquisi- las will also change quite rapidly...production processes, the necessary lead times could be updated for like items based upon current market experience. By Air Force Logistics Command (AFLC...seller prime contractors are subcontracting situations has led to a growing realiza- significant portions of the prime tion that market theory

  17. James Webb Space Telescope: Supporting Multiple Ground System Transitions in One Year

    NASA Technical Reports Server (NTRS)

    Detter, Ryan; Fatig, Curtis; Steck, Jane

    2004-01-01

    Ideas, requirements, and concepts developed during the very early phases of the mission design often conflict with the reality of a situation once the prime contractors are awarded. This happened for the James Webb Space Telescope (JWST) as well. The high level requirement of a common real-time ground system for both the Integration and Test (I&T), as well as the Operation phase of the mission is meant to reduce the cost and time needed later in the mission development for re-certification of databases, command and control systems, scripts, display pages, etc. In the case of JWST, the early Phase A flight software development needed a real-time ground system and database prior to the spacecraft prime contractor being selected. To compound the situation, the very low level requirements for the real-time ground system were not well defined. These two situations caused the initial real-time ground system to be switched out for a system that was previously used by the Bight software development team. To meet the high-!evel requirement, a third ground system was selected based on the prime spacecraft contractor needs and JWST Project decisions. The JWST ground system team has responded to each of these changes successfully. The lessons learned from each transition have not only made each transition smoother, but have also resolved issues earlier in the mission development than what would normally occur.

  18. 40 CFR 35.938-9 - Subcontracts under construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean... prime contractor under a formally advertised, competitively bid, fixed price construction contract...

  19. Shoot, Move, Communicate, Purchase: How United States Special Forces Can Better Employ Money as a Weapon System

    DTIC Science & Technology

    2011-12-01

    and Suspension & Debarment Hearing, February 28, 2011, 9, http://www.wartimecontracting.gov/docs/hearing2011–02–28_testimony- Ginman.pdf (accessed...Counterinsurgency. December, 2006. Ginman, Richard T. Ensuring Contractor Accountability: Past Performance and Suspension & Debarment ...tied to the enemy. This vetting process helped debar or suspend 10 prime contractors with ties to criminal networks or the insurgency. In his written

  20. Capital Investment Motivational Techniques Used by Prime Contractors on Subcontractors

    DTIC Science & Technology

    1984-12-01

    by block number) Productivity; Profit Policy; Subcontractors; Weighted Guidelines; Profitability; Profit 20. ABSTRACT (Continue on reverse aide If...probably productivity gains that could be made if defense contractors increased their investment [6:39]. A major deterrent to the Weighted Guideline...any profit gained would be offset to some degree by a profit loss from a reduction in profit based on costs . This result is a consequence of the cost

  1. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Attendees speak to representatives from NASA's Office of Small Business Programs during Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  2. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    John Murray, chief executive officer of the Canaveral Port Authority, welcomes participants to the Kennedy Space Center's 27th Business Opportunities Expo at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  3. Industry perspectives on Plug-& -Play Spacecraft Avionics

    NASA Astrophysics Data System (ADS)

    Franck, R.; Graven, P.; Liptak, L.

    This paper describes the methodologies and findings from an industry survey of awareness and utility of Spacecraft Plug-& -Play Avionics (SPA). The survey was conducted via interviews, in-person and teleconference, with spacecraft prime contractors and suppliers. It focuses primarily on AFRL's SPA technology development activities but also explores the broader applicability and utility of Plug-& -Play (PnP) architectures for spacecraft. Interviews include large and small suppliers as well as large and small spacecraft prime contractors. Through these “ product marketing” interviews, awareness and attitudes can be assessed, key technical and market barriers can be identified, and opportunities for improvement can be uncovered. Although this effort focuses on a high-level assessment, similar processes can be used to develop business cases and economic models which may be necessary to support investment decisions.

  4. Risk Management for the International Space Station

    NASA Technical Reports Server (NTRS)

    Sebastian, J.; Brezovic, Philip

    2002-01-01

    The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

  5. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract... subcontract level, the CFAO for the subcontractor shall furnish a copy of the negotiation memorandum or the... the prime contractor level. ...

  6. Navy Acquisition: Cost, Schedule, and Performance of New Submarine Combat Systems

    DTIC Science & Technology

    1990-01-01

    1985). Page 8 GAO/NSIAD-90-72 Submarine Combat Systems Chapter 1 Introduction In December 1983 the Navy awarded the International Business Machines...contracts to the General Electric Com- pany and the International Business Machines. In December 1987 the Navy selected General Electric as the prime...contractor and International Business Machines as the "follower" contractor. On March 31, 1988. the Navy awarded General Electric a $1.84 billion fixed

  7. 48 CFR 919.7001 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUSINESS PROGRAMS The Department of Energy Mentor-Protege Program 919.7001 Scope of subpart. The Department of Energy (DOE) Mentor-Protege Program is designed to encourage DOE prime contractors to assist small...

  8. What We Offer | FNLCR Staging

    Cancer.gov

    Opportunities We recognize that employee benefit programs are an important part of the total compensation package, and are committed to providing you with comprehensive benefit options. The Frederick National Lab's prime contractor, Leidos Biomedi

  9. Space Shuttle Project

    NASA Image and Video Library

    1977-11-18

    This photograph shows Solid Rocket Booster segments undergoing stacking operations in Marshall Space Flight Center's Building 4707. The Solid Rocket Boosters were designed in-house at the Marshall Center with the Thiokol Corporation as the prime contractor.

  10. 78 FR 42391 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... for the Jobs Act was the belief that contracting officers and prime contractors are not reporting or... for making false claims. SBA notes that the requirements that apply in the construction arena do not...

  11. An engineering database management system for spacecraft operations

    NASA Technical Reports Server (NTRS)

    Cipollone, Gregorio; Mckay, Michael H.; Paris, Joseph

    1993-01-01

    Studies at ESOC have demonstrated the feasibility of a flexible and powerful Engineering Database Management System in support for spacecraft operations documentation. The objectives set out were three-fold: first an analysis of the problems encountered by the Operations team in obtaining and managing operations documents; secondly, the definition of a concept for operations documentation and the implementation of prototype to prove the feasibility of the concept; and thirdly, definition of standards and protocols required for the exchange of data between the top-level partners in a satellite project. The EDMS prototype was populated with ERS-l satellite design data and has been used by the operations team at ESOC to gather operational experience. An operational EDMS would be implemented at the satellite prime contractor's site as a common database for all technical information surrounding a project and would be accessible by the cocontractor's and ESA teams.

  12. Current Practices to Decrease Subcontractor Bid Shopping in the Public Sector

    DTIC Science & Technology

    1993-01-01

    rarely done because most contractors refuse to accept such a condition (6s15). Those public agencies adhering to the doctrine of promissory estoppel ...also encourage bid shopping. The doctrine of promissory estoppel dictates that a subcontractor must stand by his bid quote if it is used by the prime...Holman was not awarded the subcontract. (3) It is unfair to bind the subcontractor under promissory estoppel without binding the general contractor. (4

  13. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...

  14. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...

  15. 75 FR 57690 - Acquisition Regulation: Sustainable Acquisition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... coordinate its activities with and submit required reports through the Environmental Sustainability... reports directly to the Prime Contractor's Environmental Sustainability Coordinator at the supported... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...

  16. 48 CFR 952.223-78 - Sustainable acquisition program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... activities with and submit required reports through the Environmental Sustainability Coordinator or... Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The Subcontractor... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...

  17. 48 CFR 952.223-78 - Sustainable acquisition program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... activities with and submit required reports through the Environmental Sustainability Coordinator or... Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The Subcontractor... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...

  18. 48 CFR 952.223-78 - Sustainable acquisition program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... activities with and submit required reports through the Environmental Sustainability Coordinator or... Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The Subcontractor... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...

  19. 48 CFR 952.223-78 - Sustainable acquisition program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... activities with and submit required reports through the Environmental Sustainability Coordinator or... Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The Subcontractor... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...

  20. What We Offer | Frederick National Laboratory for Cancer Research

    Cancer.gov

    Opportunities We recognize that employee benefit programs are an important part of the total compensation package, and are committed to providing you with comprehensive benefit options. The Frederick National Laboratory's prime contractor, Leidos

  1. Prime Contract Awards Over $25,000 by Major System, Contractor and State Part 1 (AAA-NAVY-AVG NAVY)

    DTIC Science & Technology

    1990-01-01

    Q-COC’) -4 M’i (a -4 c"a(aeo - ( D 0 AC 1 -ao f-.r qva 0(%Ioa.4 ()t a. c~cv(vc4 z *Za in -0f (4Jl w -44- m - .41 C,4 Ui 0 C4 IC4 P- -a l~~II I II cLE E...AO-A236 155iiiilulll l I l 1990 ANNUAL Prime Contract Awards Over $25,000 by Major System, Contractor and State Part 1 (AAA-NAVY-AVG NAVY) WHS...Special . 1 -9 __28284 pages I1 ~ . - e21 M(%I% cm -40W -4 I4 m V .. 4 mt WC)a r a- 4-r w~l w zl- qt qt V .4- 01-4 41-4 . 40 o r Lu V) c I OL 9 C U c

  2. Orbital transfer rocket engine technology: Advanced engine study

    NASA Technical Reports Server (NTRS)

    Hayden, Warren R.

    1992-01-01

    An advanced LOX/LH2 engine study for the use of NASA and vehicle prime contractors in developing concepts for manned missions to the Moon, Mars, and Phobos is documented. Parametric design data was obtained at five engine thrusts from 7.5K lbf to 50K lbf. Also, a separate task evaluated engine throttling over a 20:1 range and operation at a mixture ratio of 12 plus or minus 1 versus the 6 plus or minus 1 nominal. Cost data was also generated for DDT&E, first unit production, and factors in other life cycle costs. The major limitation of the study was lack of contact with vehicle prime contractors to resolve the issues in vehicle/engine interfaces. The baseline Aerojet dual propellant expander cycle was shown capable of meeting all performance requirements with an expected long operational life due to the high thermal margins. The basic engine design readily accommodated the 20:1 throttling requirement and operation up to a mixture ratio of 10 without change. By using platinum for baffled injector construction the increased thermal margin allowed operation up to mixture ratio 13. An initial engine modeling with an Aerojet transient simulation code (named MLETS) indicates stable engine operation with the baseline control system. A throttle ratio of 4 to 5 seconds from 10 percent to 100 percent thrust is also predicted. Performance predictions are 483.1 sec at 7.5K lbf, 487.3 sec at 20K lbf, and 485.2 sec at 50K lbf with a mixture ratio of 6 and an area ratio of 1200. Engine envelopes varied from 120 in. length/53 in. exit diameter at 7.5K lbf to 305 in. length/136 in. exit diameter at 50 K lbf. Packaging will be an important consideration. Continued work is recommended to include more vehicle prime contractor/engine contractor joint assessment of the interface issues.

  3. Fuel cell technology program contract summary report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A fuel cell technology program which was established to advance the state-of-the-art of hydrogen-oxygen fuel cells using the P and WA PC8B technology as the base is reported. The major tasks of this program consisted of (1) fuel cell system studies of a space shuttle powerplant conceptual design (designated engineering model -1, EM-1) supported by liaison with the space shuttle prime contractors; (2) component and subsystem technology advancement and; (3) a demonstrator powerplant test. Fuel cell system studies, with the EM-1 as the focal point of design activities, included determination of voltage regulation, specific reactant consumption, weight, voltage level and performance characteristics. These studies provided the basis for coordination activities with the space shuttle vehicle prime contractor. Interface information, on-board checkout and in-flight monitoring requirements, and development cost data were also provided as part of this activity. Even though the two vehicles primes had different voltage requirements (115 volts in one case and 28 volts in the other), it was concluded that either option could be provided in the fuel cell power system by the electrical hook-up of the cells in the stack.

  4. Savannah River Site Environmental Report for 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arnett, M

    The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

  5. 48 CFR 3.502-2 - Subcontractor kickbacks.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... 8703(b)). [52 FR 6121, Feb. 27, 1987; 52 FR 9989, Mar. 27, 1987, as amended at 53 FR 34226, Sept. 2... contract price charged by a prime contractor to the United States. (b) Imposes criminal penalties on any...

  6. LOVE CANAL MONITORING PROGRAM. VOLUME 1

    EPA Science Inventory

    This report summarizes the prime contractor activities during the monitoring phase of the Love Canal project. Since GCA Corporation was only responsible for data collection, no analytical results appear in this report. The program involved a multifaceted sampling and analytical e...

  7. 76 FR 81940 - Submission for OMB Review; Biobased Procurements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Procurements AGENCY: Department of Defense (DOD), General Services Administration (GSA), and National... Products Under Service and Construction Contracts, is being revised to require prime contractors to report...

  8. Predictive Engineering Implementation at KSC

    NASA Technical Reports Server (NTRS)

    Mosconi, Jane; Schafer, Loraine

    1995-01-01

    This paper provides an overview of what the primary contractors at Kennedy Space Center (KSC) are doing in the field of predictive engineering. The technologies employed by each of the contractors and the cost savings associated with the implementation of these predictive engineering methods are discussed. The sources include predictive engineering implementation plans, published by each of the contractors and interviews with the authors of these implementation plans.

  9. 48 CFR 908.7106 - Security cabinets.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....7106 Section 908.7106 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7106 Security...) Fixed-price prime contractors and lower tier subcontractors may use GSA acquisition sources for security...

  10. 76 FR 43988 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... Sill, OK. NPAs: Professional Contract Services, Inc., Austin, TX (Prime Contractor); Work Services.... Contracting Activity: General Services Administration, Fort Worth, TX Coverage: A-List for the Total...: Department of the Army Research, Development, & Engineering Command, Natick, MA. Coverage: C-List for 100% of...

  11. 48 CFR 3.502-1 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Definitions. 3.502-1 Section 3.502-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER..., prime contractor employee, subcontractor, or subcontractor employee for the purpose of improperly...

  12. 48 CFR 3.502-1 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Definitions. 3.502-1 Section 3.502-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER..., prime contractor employee, subcontractor, or subcontractor employee for the purpose of improperly...

  13. 48 CFR 3.502-1 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Definitions. 3.502-1 Section 3.502-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER..., prime contractor employee, subcontractor, or subcontractor employee for the purpose of improperly...

  14. 24 CFR 200.215 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Officer. (See § 200.224) (e) Principal. (1) An individual, joint venture, partnership, corporation, trust... a project as sponsor, owner, prime contractor, Turnkey Developer, management agent, nursing home... or contract of assistance; (2) a hospital, group practice facility or nursing home; (3) cooperative...

  15. Subcontracting Opportunities with DoD Major Prime Contractors

    DTIC Science & Technology

    1996-06-01

    The Department of Defense (DoD) offers two markets for small business and small disadvantaged business seeking defense contracting and defense...opportunities. The publication exclusively addresses the defense subcontracting opportunities market. The DoD encourages small business and small disadvantaged

  16. 13 CFR 120.381 - Eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....381 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Special Purpose Loans Defense Economic Transition Assistance § 120.381 Eligibility. (a) Eligible small businesses. A small... Program on which the small business was a prime contractor, subcontractor, or supplier at any tier. (b...

  17. 13 CFR 120.381 - Eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....381 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Special Purpose Loans Defense Economic Transition Assistance § 120.381 Eligibility. (a) Eligible small businesses. A small... Program on which the small business was a prime contractor, subcontractor, or supplier at any tier. (b...

  18. 13 CFR 120.381 - Eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....381 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Special Purpose Loans Defense Economic Transition Assistance § 120.381 Eligibility. (a) Eligible small businesses. A small... Program on which the small business was a prime contractor, subcontractor, or supplier at any tier. (b...

  19. 13 CFR 120.381 - Eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....381 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Special Purpose Loans Defense Economic Transition Assistance § 120.381 Eligibility. (a) Eligible small businesses. A small... Program on which the small business was a prime contractor, subcontractor, or supplier at any tier. (b...

  20. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 1 (Adamsville, Alabama-Santa Clara, California).

    DTIC Science & Technology

    1984-01-01

    CITRONELLE TORRENT CORP THE 296 296 WERCO INC 25 25 TOTAL - CITRONELLE 321 321 CLAIBORNE ERNEST CONSTRUCTION COMPANY 57 57 COLUMBIANA CENTRAL ALABAMA FAB INC...WAINWRIGHT ENGRNO CO INC 136 136 WALLEY CONTRACTORS 89 89 WELDING SPECIALISTS INC 197 197 WHITESELL-GREEN INC 1,134 1,134 WILLIAMS BURT CONSTR RMDLG CO 192 192...ENi PR I S INC 35 35 IRUSSVILLE AMERADA HESS CORPORATION 16C 166 TUSCALOOSA WILLIAMS -MC WILLIAMS CC INC 1,200 1,200 MONTGOMERY AMERICANI STERILIZER

  1. 75 FR 11729 - Secretary's Order 2-2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... Order 13515, ``Increasing Participation of Asian Americans and Pacific Islanders in Federal Programs... increase the probability of participation by small businesses as prime contractors, or to facilitate small... Orders 12432 and 12928, including efforts to increase the involvement of minority businesses in the...

  2. 48 CFR 45.503 - Support property administrator findings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Support property administrator findings. 45.503 Section 45.503 Federal Acquisition Regulations System FEDERAL ACQUISITION... property administrator findings. In instances where the prime contractor does not concur with the findings...

  3. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”« less

  4. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Shane

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”« less

  5. Engineering Software Suite Validates System Design

    NASA Technical Reports Server (NTRS)

    2007-01-01

    EDAptive Computing Inc.'s (ECI) EDAstar engineering software tool suite, created to capture and validate system design requirements, was significantly funded by NASA's Ames Research Center through five Small Business Innovation Research (SBIR) contracts. These programs specifically developed Syscape, used to capture executable specifications of multi-disciplinary systems, and VectorGen, used to automatically generate tests to ensure system implementations meet specifications. According to the company, the VectorGen tests considerably reduce the time and effort required to validate implementation of components, thereby ensuring their safe and reliable operation. EDASHIELD, an additional product offering from ECI, can be used to diagnose, predict, and correct errors after a system has been deployed using EDASTAR -created models. Initial commercialization for EDASTAR included application by a large prime contractor in a military setting, and customers include various branches within the U.S. Department of Defense, industry giants like the Lockheed Martin Corporation, Science Applications International Corporation, and Ball Aerospace and Technologies Corporation, as well as NASA's Langley and Glenn Research Centers

  6. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  7. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  8. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  9. 48 CFR 17.106-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., labor learning, and other nonrecurring costs to be incurred by an “average” prime contractor or... applicable, as plant or equipment relocation or rearrangement, special tooling and special test equipment... learning. They shall not include any costs of labor or materials, or other expenses (except as indicated...

  10. Orion EM-1 Booster Preps - Aft Skirt Preps/Painting

    NASA Image and Video Library

    2016-10-28

    Technicians with Orbital ATK, prime contractor for the Space Launch System (SLS) Booster, prepare the right hand aft skirt for NASA’s SLS rocket for primer and painting inside a support building at the Hangar AF facility at Cape Canaveral Air Force Station in Florida. The space shuttle-era aft skirt, was inspected and resurfaced and will be primed and painted for use on the right hand booster of the SLS rocket for Exploration Mission 1 (EM-1). NASA is preparing for EM-1, deep-space missions, and the journey to Mars.

  11. Orion EM-1 Booster Preps - Aft Skirt Preps/Painting

    NASA Image and Video Library

    2016-10-28

    Technicians with Orbital ATK, prime contractor for the Space Launch System (SLS) Booster, prepare a paint mixture for the right hand aft skirt for NASA’s SLS in a support building at the Hangar AF facility at Cape Canaveral Air Force Station in Florida. The space shuttle-era aft skirt, was inspected and resurfaced, and will be primed and painted for use on the right hand booster of the SLS rocket for Exploration Mission 1 (EM-1). NASA is preparing for EM-1, deep-space missions, and the Journey to Mars.

  12. 76 FR 68013 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-54; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... the Small Business Administration (SBA) in its Small Disadvantaged Business (SDB) regulations. The FAR... self-represent their SDB status to prime contractors in good faith when seeking Federal subcontracting opportunities. This FAR revision removed an administrative burden for SDB subcontractors to obtain SBA...

  13. 78 FR 12745 - Accelerated Payments to Small Business Subcontractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-25

    ... Business Subcontractors AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION... Prompt Payment to Small Business Subcontractors (July 11, 2012). DoD has now discontinued the temporary... assist small business prime contractors by paying them as quickly as possible after receipt of an invoice...

  14. 48 CFR 719.273-3 - Incentives for prime contractor participation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The U.S. Agency for International...) Under the Small Business Act, 15 U.S.C. 637(d)(4)(E), USAID is authorized to provide appropriate incentives to encourage subcontracting opportunities for small business consistent with the efficient and...

  15. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  16. Dollar Summary of Prime Contract Awards by Contractor, State or Country, and Place, FY83, Part 2 (Gillespie Delorenzo Asla & Assocs-Planning Analysis Corp).

    DTIC Science & Technology

    1983-01-01

    BUILDERS INC WRIGHT PATTERSON AFS OHIO 202 202 263 202 a LOCKHART WILLIAM M CORP SAN DIEGO CALIFORNIA 125 125 125 125 LOCKHEED AIRCRAFT SERVICE CO ONTARIO...THOUSANDS) CONTRACTOR CITY STATE AGGREGATE ARMY NAVY AIR FORCE DLA OCE LORENZ a WILLIAMS INC WRIGHT PATTERSON AFB OHIO 021 821 821 821 LORENZ BEN ASSOCIATES...MONMOUTH NEW JERSEY 32 32 GIULIANI CONTRACTING CO MCGUIRE AFB NEW JERSEY 158 158 258 100 158 GIVENS ULTIMATE SERVICES INC WRIGHT PATTERSON AFB OHIO 194 194

  17. 48 CFR 819.7105 - Incentives for prime contractor participation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... VETERANS AFFAIRS SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS VA Mentor-Protégé Program 819.7105... mentor to provide developmental assistance, as described in 819.7110 to fulfill the terms of their... mentor's responsible audit agency under FAR 42.703-1, VA will consider these costs in determining...

  18. 48 CFR 31.205-33 - Professional and consultant service costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... non-Government contracts. (8) Adequacy of the contractual agreement for the service (e.g., description... the services rendered and when not contingent upon recovery of the costs from the Government (but see... the Government, or by a prime contractor or subcontractor. (3) Any other services obtained, performed...

  19. 13 CFR 124.1001 - General applicability.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Small Disadvantaged Business (SDB). It also establishes procedures by which SBA determines whether a particular concern qualifies as an SDB in response to a protest challenging the concern's status as... represent that it is an SDB in order to receive a benefit as a prime contractor on a Federal Government...

  20. 13 CFR 124.1001 - General applicability.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Small Disadvantaged Business (SDB). It also establishes procedures by which SBA determines whether a particular concern qualifies as an SDB in response to a protest challenging the concern's status as... represent that it is an SDB in order to receive a benefit as a prime contractor on a Federal Government...

  1. 13 CFR 124.1001 - General applicability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Small Disadvantaged Business (SDB). It also establishes procedures by which SBA determines whether a particular concern qualifies as an SDB in response to a protest challenging the concern's status as... represent that it is an SDB in order to receive a benefit as a prime contractor on a Federal Government...

  2. 13 CFR 124.1001 - General applicability.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Small Disadvantaged Business (SDB). It also establishes procedures by which SBA determines whether a particular concern qualifies as an SDB in response to a protest challenging the concern's status as... represent that it is an SDB in order to receive a benefit as a prime contractor on a Federal Government...

  3. 13 CFR 124.1001 - General applicability.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Small Disadvantaged Business (SDB). It also establishes procedures by which SBA determines whether a particular concern qualifies as an SDB in response to a protest challenging the concern's status as... represent that it is an SDB in order to receive a benefit as a prime contractor on a Federal Government...

  4. LOVE CANAL MONITORING PROGRAM. GCA QA/QC (QUALITY ASSURANCE/QUALITY CONTROL) SUMMARY REPORT

    EPA Science Inventory

    One of the most important responsibilities of the Love Canal prime contractor was the institution and maintenance of a quality assurance program. An important objective of the quality assurance program was to alert the subcontractors to the importance of high quality work on thei...

  5. 48 CFR 237.102-72 - Contracts for management services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... development or production of the major system ensures that Federal employees are responsible for determining— (1) Courses of action to be taken in the best interest of the Government; and (2) Best technical performance for the warfighter; and (c) The contract requires that the prime contractor for the contract may...

  6. International Space Station (ISS)

    NASA Image and Video Library

    1997-07-20

    Photograph shows the International Space Station Laboratory Module under fabrication at Marshall Space Flight Center (MSFC), Building 4708 West High Bay. Although management of the U.S. elements for the Station were consolidated in 1994, module and node development continued at MSFC by Boeing Company, the prime contractor for the Space Station.

  7. 77 FR 56709 - Proposed Information Collection (VA Subcontracting Report for Service Disabled Veteran-Owned...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ..., Federal agencies are required to publish notice in the Federal Register concerning each proposed... response to the notice. This notice solicits comments on information needed to collect information from subcontractors to compare information obtained from subcontracting plans submitted by prime contractors in order...

  8. 1401316

    NASA Image and Video Library

    2014-09-17

    RONALD BLAKELY, ASSOCIATE DIRECTOR FOR THE WHITE HOUSE INITIATIVE ON HISTORICALLY BLACK COLLEGES AND UNIVERSITIES, SPEAKS DURING NASA’S FIRST PARTNERSHIPS MEETING FOR HISTORICALLY BLACK COLLEGES AND UNIVERSITIES AND MINORITY SERVING INSTITUTIONS. NASA’S OFFICE OF SMALL BUSINESS PROGRAMS HOSTED THE EVENT, WHICH ALLOWED REPRESENTATIVES FROM 30 NATIONWIDE UNIVERSITIES AND NASA PRIME CONTRACTORS TO DISCUSS POTENTIAL SUBCONTRACTING OPPORTUNITIES

  9. 48 CFR 17.106-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., labor learning, and other nonrecurring costs to be incurred by an “average” prime contractor or..., training, and transportation to and from the job site of a specialized work force, and unrealized labor learning. They shall not include any costs of labor or materials, or other expenses (except as indicated...

  10. 78 FR 21632 - Investigative Hearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... goals of this hearing will be to gather additional information on the selection of the lithium ion (Li- ion) battery technology and how this new technology was evaluated, the role of the prime contractor... structure and findings of compliance for the Boeing 787 Li-ion battery system. Parties to the hearing...

  11. Prime Contractors | Division of Cancer Prevention

    Cancer.gov

    2015-2018 Efficacy and Intermediate Endpoint Biomarkers: The Research Institute of Fox Chase Cancer Center SRI International IIT Research Institute University of Texas MD Anderson Cancer Center University of Alabama at Birmingham Medical College of Wisconsin University of Oklahoma Health Sciences Center Weill Medical College of Cornell University Toxicology and Pharmacology

  12. 75 FR 66680 - Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ...-AG52 Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor... that contractors providing essential contractor services, as determined by the requiring activity..., implementing the requirements of DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crises...

  13. Design and development of the 2m resolution camera for ROCSAT-2

    NASA Astrophysics Data System (ADS)

    Uguen, Gilbert; Luquet, Philippe; Chassat, François

    2017-11-01

    EADS-Astrium has recently completed the development of a 2m-resolution camera, so-called RSI (Remote Sensing Instrument), for the small-satellite ROCSAT-2, which is the second component of the long-term space program of the Republic of China. The National Space Program Office of Taïwan selected EADS-Astrium as the Prime Contractor for the development of the spacecraft, including the bus and the main instrument RSI. The main challenges for the RSI development were: - to introduce innovative technologies in order to meet the high performance requirements while achieving the design simplicity necessary for the mission (low mass, low power) - to have a development approach and verification compatible with the very tight development schedule This paper describes the instrument design together with the development and verification logic that were implemented to successfully meet these objectives.

  14. KSC-05PD-0375

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, a worker inside the Multi-Purpose Logistics Module Raffaello is ready for installation of the Human Research Facility-2 (HRF-2) science rack. Raffaello will fly on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.

  15. KSC-05PD-0369

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, workers prepare the Human Research Facility-2 (HRF-2) science rack for installation into the Multi-Purpose Logistics Module Raffaello for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.

  16. KSC-05PD-0372

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, the Rack Insertion Device moves the Human Research Facility-2 (HRF-2) science rack toward the Multi-Purpose Logistics Module Raffaello (at left) for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.

  17. KSC-05PD-0368

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, the Human Research Facility-2 (HRF-2) science rack sits on a stand waiting to be installed into the Multi-Purpose Logistics Module Raffaello for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.

  18. 48 CFR 519.7009 - Application process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7009 Application process. (a) Prime contractors interested in becoming a mentor firm must apply in writing by submitting the GSA Form 3695 to the GSA Mentor-Protégé Program Manager, at GSA Office of Small Business Utilization (E...

  19. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  20. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  1. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  2. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  3. 78 FR 70475 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-71; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... amends the FAR to add Croatia as a new designated country under the World Trade Organization Government Procurement Agreement (WTO GPA). Croatia joined the European Union on July 1, 2013, which is a party to the...). This new clause requires the prime contractor, upon receipt of accelerated payments from the Government...

  4. 76 FR 68026 - Federal Acquisition Regulation; Small Disadvantaged Business Self-Certification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... Business Administration (SBA) to its small disadvantaged business (SDB) program. DATES: Effective Date... disadvantaged businesses (SDBs) to self-represent their SDB status to prime contractors in good faith when... certified by the SBA as SDB firms. DoD, GSA, and NASA received no comments in response to the interim rule...

  5. Speech Quality Measurement

    DTIC Science & Technology

    1978-05-01

    Program is a cooperative venture between RADC and some sixty-five universities eligible to participate in the program. Syracuse Uiaiversity (Department...of Electrical and Computer Engineering), Purdue University (School of Electrical Engineering), Georgia Institute of Technology (School of Electrical...Engineering), and State University of New York at Buffalo (Department of Electrical / ,./. / Engineering) act as prime contractor schools with other

  6. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  7. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  8. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  9. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  10. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (MAY 2009) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  11. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... supervision and guarantee at the highest level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into subcontracts where the functional scope of the subcontractor's obligations is...

  12. 75 FR 34286 - Federal Acquisition Regulation; FAR Case 2009-018, Payrolls and Basic Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... removed the requirement to submit complete social security numbers and home addresses of individual... of full social security numbers and home addresses of individual workers from the prime contractor on... for each employee (e.g., the last four digits of the employee's social security number). The...

  13. TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

    NASA Technical Reports Server (NTRS)

    Young, Roy M.; Adams, Charles L.

    2010-01-01

    The NASA In-Space Propulsion Technology (ISPT) Projects Office sponsored two separate, independent solar sail system design and development demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L' Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators.

  14. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    A Small Business panel discussion was held during Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. Seated at the table, from left, are Ileana Serrano, data dissemination specialist, U.S. Census Bureau; Margot Dorfman, chief executive officer, U.S. Women's Chamber of Commerce; Valerie Muck, Small Business director; U.S. Air Force; Andrew Harold, co-founder and board chairman, Florida 8(a) Alliance; and Eduardo Ramos, senior area manager, U.S. Small Business Administration. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  15. Recovery Act - Sustainable Transportation: Advanced Electric Drive Vehicle Education Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Caille, Gary

    The collective goals of this effort include: 1) reach all facets of this society with education regarding electric vehicles (EV) and plug–in hybrid electric vehicles (PHEV), 2) prepare a workforce to service these advanced vehicles, 3) create web–based learning at an unparalleled level, 4) educate secondary school students to prepare for their future and 5) train the next generation of professional engineers regarding electric vehicles. The Team provided an integrated approach combining secondary schools, community colleges, four–year colleges and community outreach to provide a consistent message (Figure 1). Colorado State University Ventures (CSUV), as the prime contractor, plays a keymore » program management and co–ordination role. CSUV is an affiliate of Colorado State University (CSU) and is a separate 501(c)(3) company. The Team consists of CSUV acting as the prime contractor subcontracted to Arapahoe Community College (ACC), CSU, Motion Reality Inc. (MRI), Georgia Institute of Technology (Georgia Tech) and Ricardo. Collaborators are Douglas County Educational Foundation/School District and Gooru (www.goorulearning.org), a nonprofit web–based learning resource and Google spin–off.« less

  16. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY 88. Part 16. (Prime Mover Company, The-Rodriguez General Contractors)

    DTIC Science & Technology

    1988-01-01

    W WZma t *0r- 0n4 0a 0 00 o W O~ z 00( (04 (0 �W-4 1(300 (3000 z40USr~cn70 acca (0 Z~n Zw zoo zovl0 ZNN""NNwIWO0-4 3.0( 400( .4.) ൰-4-403 000( 0...4-IN 0000 N 00aIN4-aN..o.0-0 0 a 8 MOM 1 -444.4-4400 .40.4 .4 .40100000-40000-480000000.4 0 WI O I00 F6 Go’t=s-r 0 - P. 3. P- f 0 0 ft 0 ft 0 w6ft 0 w...0.4(-0.4 r- 00 -0 0.4.40(0 4(0 r -~((4660t(006na"U)CF 4V蔾 0 D00L6 NNNNC) q 4 l 00:W r 4 00 (0000 I4 -00-4 -4 61L 4 -401 -4 f6 )0)00 00000"fl 4-0 L L

  17. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1976.

    DTIC Science & Technology

    1976-11-26

    section in which each contractor is located and his rank. The locations shown are those where the work was expected to be performed. Generally , the...CORP 151 B ACUPEX CORP * 72 P eENOTX CORP 2qi 8 AERCOYNE RESEARCH INC t 3’. 8 BENDIX FIELD IENGINEERING CORP 13 R AFRCJET GENERAL CORP * 42R 8 810...GFNQRAL ELECTRIC CO 33P 9 OCTY ASSCCTATFS 3 4q P GFNRFAL IkSTPUMFNT COOP 421 N DUXF UNIVERSITY * R1 P GENERAL MfTORS CORP 55 R DYNLFCTrPON CORP * 6? P

  18. The TPS Advanced Development Project for CEV

    NASA Technical Reports Server (NTRS)

    Reuther, James; Wercinski, Paul; Venkatapathy, Ethiraj; Ellerby, Don; Raiche, George; Bowman, Lynn; Jones, Craig; Kowal, John

    2006-01-01

    The CEV TPS Advanced Development Project (ADP) is a NASA in-house activity for providing two heatshield preliminary designs (a Lunar direct return as well as a LEO only return) for the CEV, including the TPS, the carrier structure, the interfaces and the attachments. The project s primary objective is the development of a single heatshield preliminary design that meets both Lunar direct return and LEO return requirements. The effort to develop the Lunar direct return capable heatshield is considered a high risk item for the NASA CEV development effort due to the low TRL (approx. 4) of the candidate TPS materials. By initiating the TPS ADP early in the development cycle, the intent is to use materials analysis and testing in combination with manufacturing demonstrations to reduce the programmatic risk of using advanced TPS technologies in the critical path for CEV. Due to the technical and schedule risks associated a Lunar return heatshield, the ADP will pursue a parallel path design approach, whereby a back-up TPS/heatshield design that only meets LEO return requirements is also developed. The TPS materials and carrier structure design concept selections will be based on testing, analysis, design and evaluation of scalability and manufacturing performed under the ADP. At the TPS PDR, the preferred programmatic strategy is to transfer the continued (detailed) design, development, testing and evaluation (DDT&E) of both the Lunar direct and LEO return designs to a government/prime contractor coordinated sub-system design team. The CEV prime contractor would have responsibility for the continued heatshield sub-system development. Continued government participation would include analysis, testing and evaluation as well as decision authority at TPS Final System Decision (FSD) (choosing between the primary and back-up heatshields) occurring between TPS PDR and TPS Critical Design Review (CDR). After TPS FSD the prime CEV contractor will complete the detailed design, certification testing, procurement, and integration of the CEV TPS.

  19. The NGST Yardstick Integrated Science Instrument Module (ISIM) Feasibility Study

    NASA Astrophysics Data System (ADS)

    Greenhouse, M. A.; NGST ISIM Team

    1999-05-01

    The Next Generation Space Telescope (NGST) Integrated Science Instrument Module (ISIM) is a distributed system consisting of a cryogenic instrument module that is integrated with the Optical Telescope Assembly (OTA) and science processors, software, and other electronics located in the Space Support Module (SSM). The ISIM system provides structure, environment, and data handling for several modular science instruments as well as several components of the OTA optics train. An ISIM baseline design and feasibility study is ongoing at GSFC. This pre-Phase A design was developed for integration with the Yardstick NGST architecture and packaging in a 5 m class EELV fairing. The goals of this study are to: [1] demonstrate mission science feasibility, [2] assess ISIM engineering and cost feasibility, [3] identify ISIM technology challenge areas,and [4] enable smart customer procurement of the NGST. In depth results from this work beyond those displayed here can be found at: http://www701.gsfc.nasa.gov/isim/isim.htm The flight ISIM will be developed by a GSFC led IPT that includes members from the STScI and, during Phase A/B, will grow to include the NGST Prime Contractor, and science instrument development teams from European, Canadian , and US science communities. Science instruments will be competitively procured from the science community, and will be integrated into the ISIM by GSFC. The flight qualified ISIM will then be delivered by GSFC to the NGST Prime Contractor for observatory level integration. At the start of NGST Phase A (Spring 1999), two competing prime contractors will begin development of separate NGST architectures, and the ISIM IPT will develop two ISIM designs corresponding to these architectures. Down selection to a single design will occur during mid 2001. The ISIM team welcomes science community feedback. Contact the IPT lead: Matt Greenhouse: matt@stars.gsfc.nasa.gov.

  20. Implementation of a Mentor-Protege Program by a Major Department of Defense Contractor

    DTIC Science & Technology

    1991-06-01

    Department of Defense contractors to furnish disadvantaged small business concerns with assistance designed to enhance their capabilities to perform...implementation by analyzing the perceptions of one large DoD contractor and the small disadvantaged business community regarding the Mentor-Protege program...offered by this program would be effective in improving the capabilities of small disadvantaged businesses. There are, however, several barriers present

  1. 78 FR 48123 - Federal Acquisition Regulation; Contractor Comment Period, Past Performance Evaluations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... Regulation; Contractor Comment Period, Past Performance Evaluations AGENCY: Department of Defense (DoD...) to implement provisions of law limiting the periods allowed for contractor comments on past....S.C. 2302 Note). Section 853, entitled ``Inclusion of Data on Contractor Performance in Past...

  2. A self-reliant RSI payload development in Taiwan

    NASA Astrophysics Data System (ADS)

    Weng, Shui-Lin; Lian, Yu-Yung

    2011-10-01

    Instead of outsourcing the whole FORMOSAT-2 satellite to a foreign prime contractor, the National Space Organization in Taiwan is stepping ahead to take the full responsibility of consolidating self-reliant space technology capabilities. A newly initiated program FORMOSAT-5 satellite, not only to build a heritage design of a spacecraft bus but also, selfreliantly, to leap a big step toward Remote Sensing Instrument payload development, is sailing on its voyage. Among the payload development effort, an integrated circuit of the kind Complementary Metal Oxide Semiconductor instead of Charge-coupled Device is chosen as the image sensor playing the lead role for the instrument. Despite the foreseen technical concerns, management issues over scheduling and documentation are constantly emerging owing to the payload development underwent is collaborated by several domestic industries and research centers. Regardless of challenges we may confront with, a carefully planned strategy especially emphasizing on the product realization processes is considered, discussed, and implemented.

  3. Report on the Loss of the Mars Polar Lander and Deep Space 2 Missions

    NASA Technical Reports Server (NTRS)

    Albee, Arden; Battel, Steven; Brace, Richard; Burdick, Garry; Casani, John; Lavell, Jeffrey; Leising, Charles; MacPherson, Duncan; Burr, Peter; Dipprey, Duane

    2000-01-01

    NASA's Mars Surveyor Program (MSP) began in 1994 with plans to send spacecraft to Mars every 26 months. Mars Global Surveyor (MGS), a global mapping mission, was launched in 1996 and is currently orbiting Mars. Mars Surveyor '98 consisted of Mars Climate Orbiter (MCO) and Mars Polar Lander (MPL). Lockheed Martin Astronautics (LMA) was the prime contractor for Mars Surveyor '98. The Jet Propulsion Laboratory (JPL), California Institute of Technology, manages the Mars Surveyor Program for NASA's Office of Space Science. MPL was developed under very tight funding constraints. The combined development cost of MPL and MCO, including the cost of the two launch vehicles, was approximately the same as the development cost of the Mars Pathfinder mission, including the cost of its single launch vehicle. The MPL project accepted the challenge to develop effective implementation methodologies consistent with programmatic requirements.

  4. ATHENA: system design and implementation for a next-generation x-ray telescope

    NASA Astrophysics Data System (ADS)

    Ayre, M.; Bavdaz, M.; Ferreira, I.; Wille, E.; Lumb, D.; Linder, M.; Stefanescu, A.

    2017-08-01

    ATHENA, Europe's next generation x-ray telescope, is currently under Assessment Phase study with parallel candidate industrial Prime contractors after selection for the 'L2' slot in ESA's Cosmic Vision Programme, with a mandate to address the 'Hot and Energetic Universe' Cosmic Vision science theme. This paper will consider the main technical requirements of the mission, and their mapping to resulting design choices at both mission and spacecraft level. The reference mission architecture and current reference spacecraft design will then be described, with particular emphasis given to description of the Science Instrument Module (SIM) design, currently under the responsibility of the ESA Study Team. The SIM is a very challenging item due primarily to the need to provide to the instruments (i) a soft ride during launch, and (ii) a very large ( 3 kW) heat dissipation capability at varying interface temperatures and locations.

  5. KSC-05PD-0371

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, the Human Research Facility-2 (HRF-2) science rack is attached to the Rack Insertion Device that will install it into the Multi-Purpose Logistics Module Raffaello (at left) for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.

  6. KSC-05PD-0374

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, a worker watches as the Rack Insertion Device slowly moves the Human Research Facility-2 (HRF-2) science rack into the Multi-Purpose Logistics Module Raffaello for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.

  7. KSC-05PD-0370

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, workers prepare to attach the Human Research Facility-2 (HRF-2) science rack onto the Rack Insertion Device. HRF-2 will be installed into the Multi-Purpose Logistics Module Raffaello (at left) for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.

  8. KSC-05PD-0373

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, a worker stands by as the Rack Insertion Device slowly moves the Human Research Facility-2 (HRF-2) science rack into the Multi-Purpose Logistics Module Raffaello for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.

  9. 75 FR 34277 - Federal Acquisition Regulation; FAR Case 2008-007, Additional Requirements for Market Research

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ...The Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) have agreed on an interim rule amending the Federal Acquisition Regulation (FAR) to implement Section 826 of the National Defense Authorization Act for Fiscal Year 2008 (FY08 NDAA). Section 826 established additional requirements in subsection (c) of 10 U.S.C. 2377. As a matter of policy, these requirements are extended to all executive agencies. Specifically, the head of the agency must conduct market research before issuing an indefinite-delivery indefinite-quantity (ID/IQ) task or delivery order for a noncommercial item in excess of the simplified acquisition threshold. In addition, a prime contractor with a contract in excess of $5 million for the procurement of items other than commercial items is required to conduct market research before making purchases that exceed the simplified acquisition threshold for or on behalf of the Government.

  10. 48 CFR 519.7003 - General policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7003 General policy. (a) A large business prime contractor that meets the requirements at section 519.7006, and is approved as a mentor firm by the Mentor-Protégé Program Manager, may enter into an Agreement with a small business concern, small...

  11. 48 CFR 719.273-2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The U.S. Agency for International Development (USAID) Mentor-Prot... 124. The determination of affiliation is a function of the SBA. (a) A “Mentor” is a prime contractor... designed to enhance the business success of the Protégé. (b) “Program” refers to the USAID Mentor-Protégé...

  12. 48 CFR 3052.209-75 - Prohibited financial interests for lead system integrators.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for the development or production of a major system, if the prime contractor is not expected at the time of award to perform a substantial portion of the work on the system and the major subsystems. (4... procurement of services, the primary purpose of which is to perform acquisition functions closely associated...

  13. 14 CFR Appendix A to Part 152 - Contract and Labor Provisions

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... paragraph L need not be included in prime contracts of $2,000 or less. A. Minimum wages. (1) All mechanics... the contractor and such laborers and mechanics; and the wage determination decision(s) shall be posted... under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages...

  14. 14 CFR Appendix A to Part 152 - Contract and Labor Provisions

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... paragraph L need not be included in prime contracts of $2,000 or less. A. Minimum wages. (1) All mechanics... the contractor and such laborers and mechanics; and the wage determination decision(s) shall be posted... under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages...

  15. 14 CFR Appendix A to Part 152 - Contract and Labor Provisions

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... paragraph L need not be included in prime contracts of $2,000 or less. A. Minimum wages. (1) All mechanics... the contractor and such laborers and mechanics; and the wage determination decision(s) shall be posted... under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages...

  16. 14 CFR Appendix A to Part 152 - Contract and Labor Provisions

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... paragraph L need not be included in prime contracts of $2,000 or less. A. Minimum wages. (1) All mechanics... the contractor and such laborers and mechanics; and the wage determination decision(s) shall be posted... under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages...

  17. 14 CFR Appendix A to Part 152 - Contract and Labor Provisions

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... paragraph L need not be included in prime contracts of $2,000 or less. A. Minimum wages. (1) All mechanics... the contractor and such laborers and mechanics; and the wage determination decision(s) shall be posted... under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages...

  18. Outlook on EDRS-C

    NASA Astrophysics Data System (ADS)

    Migliore, R.; Duncan, J.; Pulcino, V.; Bourne, D.; Voegt, S.; Perez, G.

    2017-09-01

    EDRS-C will operate on a geostationary orbit as the second node of the European Data Relay System (EDRS). The EDRS-C satellite, designed by OHB System as prime contractor, has been procured in the frame of a Public Private Partnership (PPP) between Airbus Defence and Space and ESA. EDRS-C is currently under assembly at OHB facilities in Bremen.

  19. 49 CFR Appendix A to Part 23 - Uniform Report of ACDBE Participation

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... BUSINESS ENTERPRISE IN AIRPORT CONCESSIONS Pt. 23, App. A Appendix A to Part 23—Uniform Report of ACDBE... purchased by the airport itself or by concessionaires and management contractors from certified DBEs. Block... concessionaires (prime and sub) and purchases of goods and services (ACDBE and non-ACDBE combined) at the airport...

  20. 49 CFR Appendix A to Part 23 - Uniform Report of ACDBE Participation

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUSINESS ENTERPRISE IN AIRPORT CONCESSIONS Pt. 23, App. A Appendix A to Part 23—Uniform Report of ACDBE... purchased by the airport itself or by concessionaires and management contractors from certified DBEs. Block... concessionaires (prime and sub) and purchases of goods and services (ACDBE and non-ACDBE combined) at the airport...

  1. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Register notice. (4) Decision. SBA will render its decision after the close of the comment period. If SBA decides against a change, SBA will publish notice of its decision in the Federal Register. Concurrent with the notice, SBA will advise the requester of its decision in writing. If SBA decides in favor of a...

  2. Remote Excavation of Heavily Contaminated UXO Sites

    DTIC Science & Technology

    2007-12-01

    detonation RF radio frequency RPM revolutions per minute Shaw Shaw Environmental Services SUXOS senior UXO supervisor Timberline Timberline ... Timberline Environmental Services, Inc. ( Timberline ). Timberline , and most notably Mr. Terry Northcutt, was the heart and soul of this project...the prime contractor responsible for project management and UXO support; and Timberline Environmental Services, 2 Inc. ( Timberline ) is responsible

  3. 75 FR 38684 - Federal Acquisition Regulation; FAR Case 2010-008, Recovery Act Subcontract Reporting Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... workforce. At a minimum, the subcontractor shall provide-- (A) A brief description of the types of jobs... description may rely on job titles, broader labor categories, or the subcontractor's existing practice for... funded awards of $25,000 or more, to report jobs information to the prime contractor for reporting into...

  4. 75 FR 77739 - Federal Acquisition Regulation; Uniform Suspension and Debarment Requirement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ...-the-shelf (COTS) items; and In the case of commercial items, such term includes only the first-tier subcontracts. This has the effect, except for COTS items, of expanding the requirement of 2455(a), which states... for COTS items; subcontractors for COTS items will not be required to disclose to the prime contractor...

  5. Proceedings of the DOD/Joint Services Production Readiness Reviews Conference, Dayton, Ohio, 19-20 November 1980

    DTIC Science & Technology

    1980-01-01

    reproduction cost of data furnished to the PRR team, and (3) travel cost of prime contractor personnel traveling to subcontractor PRRs, if any. The...got our first assignment - to conduct a PRR on the CH-53E Super Stallion , heavy lift helicopter being developed by Sikorsky Aircraft. The planning

  6. 77 FR 35883 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security... Contractors (DoDI 3020.50) was revised on August 1, 2011, and the final rule to implement section 862 of the NDAA for FY 2008, as amended, 32 CFR part 159, Private Security Contractors Operating in Contingency...

  7. 48 CFR 519.7008 - Selection of protégé firms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7008 Selection of protégé firms. (a) Mentor firms will be solely responsible for selecting protégé firms. Mentors are encouraged to... subcontractor or a newly selected subcontractor for the prime contractor's GSA contract. (b) Mentor firms may...

  8. 48 CFR 552.219-75 - GSA Mentor-Protégé Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false GSA Mentor-ProtégÃ....219-75 GSA Mentor-Protégé Program. As prescribed in 519.7017(a), insert the following clause: GSA Mentor-ProtéGé Program (SEP 2009) (a) Prime contractors, including small businesses, are encouraged to...

  9. 48 CFR 352.219-70 - Mentor-protégé program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Mentor-protégé program... Mentor-protégé program. As prescribed in 319.270-1(a), the Contracting Officer shall insert the following provision: Mentor-Protégé Program (January 2010) (a) Large business prime contractors serving as mentors in...

  10. A Wideband Autonomous Cognitive Radio Development and Prototyping System

    DTIC Science & Technology

    2017-11-14

    Gain, High Frequency , Circularly Polarized Planar Antenna Arrays for Space Applications”, NASA. 3. C. G. Christodoulou (Co-Principal Investigator...Investigator), “Cognitive Communications for SATCOM”, Space Vehicles (RV) University Grants Program, 04/26/16-04/25/17 ($150K), Air Force Research...Aerospace (Prime Contractor). 2. S. K. Jayaweera (Principal Investigator), “Cognitive Communications for SATCOM”, Space Vehicles (RV) University Grants

  11. 48 CFR 22.406-9 - Withholding from or suspension of contract payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... damages due the United States under the Contract Work Hours and Safety Standards Act. (See 22.302.) (1) If... the same prime contractor that is subject to either Davis-Bacon Act or Contract Work Hours and Safety... Withholdings Under the Davis-Bacon Act (40 U.S.C. 276(a)) and/or Contract Work Hours and Safety Standards Act...

  12. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E Fiscal Year 1989

    DTIC Science & Technology

    1989-01-01

    COMPUTER SCIENCES CORPORATION 84 B AVCO RESEARCH LABORATORY INC 109 B CONTEL FEDERAL SYSTEMS INC 439 B B D SYSTEMS INC 427 B CONTRAVES GOERZ CORPORATION...2,121 Costa Mesa California 2,026 Santa Ana California 52 450 COMPRHENSIVE TECHNOLOGIES INTL S 2,109 * Chant illy Virginia 2,109 427 CONTRAVES GOERZ

  13. Aircraft

    DTIC Science & Technology

    2002-01-01

    electronics, systems integration and information technology company.39 Northrop Grumman no longer seeks a position as a prime contractor/integrator of fixed...of the spares procurement and distribution processes. Finally, they recognize that excellence in Information Technology (IT) is a strategic advantage...business in export dollars, the industry has been forced to look for new markets as worldwide aircraft sales have dropped. Because the U.S. national

  14. 49 CFR 26.53 - What are the good faith efforts procedures recipients follow in situations where there are...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION FINANCIAL ASSISTANCE PROGRAMS Goals, Good Faith Efforts, and Counting § 26.53 What are the good...: (i) The names and addresses of DBE firms that will participate in the contract; (ii) A description of... in the contract as provided in the prime contractor's commitment; and (vi) If the contract goal is...

  15. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  16. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (MAY 2009) (a) Prime contractors are encouraged to participate in the...

  17. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  18. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  19. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  20. Contingency Contractor Optimization Phase 3 Sustainment Cost by JCA Implementation Guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Arguello, Bryan

    This document provides implementation guidance for implementing personnel group FTE costs by JCA Tier 1 or 2 categories in the Contingency Contractor Optimization Tool – Engineering Prototype (CCOT-P). CCOT-P currently only allows FTE costs by personnel group to differ by mission. Changes will need to be made to the user interface inputs pages and the database

  1. Subaru FATS (fault tracking system)

    NASA Astrophysics Data System (ADS)

    Winegar, Tom W.; Noumaru, Junichi

    2000-07-01

    The Subaru Telescope requires a fault tracking system to record the problems and questions that staff experience during their work, and the solutions provided by technical experts to these problems and questions. The system records each fault and routes it to a pre-selected 'solution-provider' for each type of fault. The solution provider analyzes the fault and writes a solution that is routed back to the fault reporter and recorded in a 'knowledge-base' for future reference. The specifications of our fault tracking system were unique. (1) Dual language capacity -- Our staff speak both English and Japanese. Our contractors speak Japanese. (2) Heterogeneous computers -- Our computer workstations are a mixture of SPARCstations, Macintosh and Windows computers. (3) Integration with prime contractors -- Mitsubishi and Fujitsu are primary contractors in the construction of the telescope. In many cases, our 'experts' are our contractors. (4) Operator scheduling -- Our operators spend 50% of their work-month operating the telescope, the other 50% is spent working day shift at the base facility in Hilo, or day shift at the summit. We plan for 8 operators, with a frequent rotation. We need to keep all operators informed on the current status of all faults, no matter the operator's location.

  2. Dollar Summary of Prime Contract Awards by Contractor, State or Country, and Place, FY83, Part 3 (Planning Design & Research Engr-Zytron Corp.)

    DTIC Science & Technology

    1983-01-01

    MACNEIL CONSTR CO INC AIR FORCE ACADEMY COLORADO 77 77SCHEUNER MACNEIL CONSTR CO INC FORT CARSON COLORADO 51 51SCHEUNER MACNEIL CONSTR CO INC ALPENA ...69 69 WILSON DORIITORY MANAGEMENT CO ALPENA MICHIGAN 41 41 41 41 WILSON EXCAVATING & BLDG CONTR LEXINGTON KENTUCKY 86 86 86 86 WILSON F 5 0

  3. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 3, (Anderson, Indiana-Winona, Mississippi).

    DTIC Science & Technology

    1984-01-01

    ALMONT ALMONT WELDING WORKS INC 102 102 ALPENA FLETCHER MOTEL 27 27 HARRYS OIL CO 65 65 HOMANT OIL CO 117 117 KOSS INDUSTRIES INC 538 538 PARSONS G S...COMPANY 108 Joe XEROX CORPORATION 59 59 ZOLNIEREK DAVID J INC 43 43 TOTAL - ALPENA 957 667 290 ANN ARBOR ADVERTEL COMMUNICATION INC 60 AMAX MATERIALS

  4. The Pittsburgh-Based Project To Train Educational R & D Personnel. Research Training Through a Multiple System Consortium, Paper Number 1.

    ERIC Educational Resources Information Center

    Heathers, Glen

    The Learning Research and Development Center at the University of Pittsburgh, as part of a consortium of 15 educational agencies, is the prime contractor for a project to design, conduct, and diffuse training programs for educational R & D personnel. Four training programs in the areas of curriculum development and the design and conduct of local…

  5. Pulling Up the Drawbridge: A Case Study of Rockwell International's Public Response Policy Following the Destruction of the Space Shuttle Challenger.

    ERIC Educational Resources Information Center

    Kaufman, John A.

    This paper describes the contingent media relations policy employed by Rockwell International, the prime contractor of the United States space shuttle program, following the 1986 destruction of the Challenger, and evaluates that policy in terms of its utility to Rockwell and its impact on public dissemination of information about the shuttle…

  6. International Cooperation in Acquisition, Technology and Logistics (IC in AT&L) Handbook

    DTIC Science & Technology

    2012-05-01

    Information exchanges, for instance, may lead to a cooperative RD&A project . Figure 1-1 illustrates this “ building block” concept of international...support the National Security Strategy, including the need to strengthen alliances and build partnerships. CWP projects are selected for their... projects : prime contractor (with international teaming of subcontractors), consortium and joint venture. The selection of the best industrial

  7. Production of Optical Quality Free Standing Diamond Wafer

    DTIC Science & Technology

    2008-05-19

    Title : Production of Optical Quality Free Standing Diamond Wafer Prime Contractor : Onyx Optics, Inc. 6551 Sierra Lane Dublin, Ca 94568...www.onyxoptics.com Program Manager : Helmuth Meissner Onyx Optics, Inc. 6551 Sierra Lane Dublin, CA 94568 Email: hmeissner@onyxoptics.com Ph: 925...PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Onyx Optics, Inc. 6551 Sierra Lane Dublin, Ca 94568 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING

  8. Data Rights Valuation in Software Acquisitions

    DTIC Science & Technology

    2012-09-01

    Practices (A. Krattiger et al.). MIHR (Oxford, UK), PIPRA (Davis, USA), Oswaldo Cruz Foundation (Fiocruz, Rio de Janeiro , Brazil), and bioDevelopments...are generally conveyed with software de - liverables (e.g., government purpose rights may be conveyed instead of only restricted rights to software...needed to purchase C-130J spare parts through competitive procurements. When the prime contractor de - clined to provide a technical data rights package

  9. Introduction to the novel verification concept of the instrument performances for the Meteosat third generation infrared sounder instrument (mtg-irs)

    NASA Astrophysics Data System (ADS)

    Freudling, M.; Egner, S.; Hering, M.; Carbó, F. L.; Thiele, H.

    2017-09-01

    The Meteosat Third Generation (MTG) Programme will ensure the future continuity and enhancement of meteorological data from geostationary orbit as currently provided by the Meteosat Second Generation (MSG) system. The industrial prime contractor for the space segment is Thales Alenia Space (France), with a core team consortium including OHB System AG (Germany).

  10. Classified Scrap in Lake Superior.

    DTIC Science & Technology

    1977-07-08

    DEPARTMENT OF THE ARMY St. Paul District, Corps of Engineers Lake Superior Area Canal Park Duluth, Minnesota 55802 THE DAILY MINING GAZETTE...ago. Lind concurred with the reference groupts recommendations that Reserve Mining Company’s discharge of 67,000 tons of taconite tailings into Lake...installation located ap- proximately 13 miles north of Minneapolis - St. Paul, Minnesota . The prime contractor at the plant is Federal Cartridge Corporation with

  11. NASA 2012 Small Business Industry Awards (SBIA)

    NASA Image and Video Library

    2013-04-23

    NASA Administrator Charles Bolden, left, NASA Associate Administrator for Small Business Programs Glenn A. Delgado, and NASA Deputy Administrator Lori Garver, right, pose for a photograph with Autumn Sellars, President/CEO of A2Research of Huntsville, Alabama after the company was awarded the Small Business Prime Contractor of the Year at NASA Headquarters, Tuesday, April 23, 2013 in Washington. Photo Credit: (NASA/Bill Ingalls)

  12. 13 CFR 126.618 - How does a HUBZone SBC's participation in a Mentor-Protégé relationship affect its participation...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... HUBZone SBC qualifies as small under part 121 of this chapter, SBA will not find affiliation between the... set forth in § 125.6(b) of this chapter. (ii) SBA may find affiliation between a prime HUBZone contractor and its mentor subcontractor where the mentor will perform primary and vital requirements of the...

  13. 13 CFR 126.618 - How does a HUBZone SBC's participation in a Mentor-Protégé relationship affect its participation...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... HUBZone SBC qualifies as small under part 121 of this chapter, SBA will not find affiliation between the... set forth in § 125.6(b) of this chapter. (ii) SBA may find affiliation between a prime HUBZone contractor and its mentor subcontractor where the mentor will perform primary and vital requirements of the...

  14. 13 CFR 126.618 - How does a HUBZone SBC's participation in a Mentor-Protégé relationship affect its participation...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... HUBZone SBC qualifies as small under part 121 of this chapter, SBA will not find affiliation between the... set forth in § 125.6(b) of this chapter. (ii) SBA may find affiliation between a prime HUBZone contractor and its mentor subcontractor where the mentor will perform primary and vital requirements of the...

  15. 13 CFR 126.618 - How does a HUBZone SBC's participation in a Mentor-Protégé relationship affect its participation...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... HUBZone SBC qualifies as small under part 121 of this chapter, SBA will not find affiliation between the... set forth in § 125.6(b) of this chapter. (ii) SBA may find affiliation between a prime HUBZone contractor and its mentor subcontractor where the mentor will perform primary and vital requirements of the...

  16. Adaptive Interfaces

    DTIC Science & Technology

    1991-03-01

    Project Engineer: Sharon M. Walter/COES/(315) 330-7650 Prime Contractor: lIT Research Institute (IITRI) 12a. DISTRIBUTION/AVAILABIUTY STATEMENT 12b...F30602- 87-D-0094. This contract is with IIT Research Institute (IITRI) and is sponsored by the Rome Air Development Center. The work was performed by... Research Institute (IITRI) and Rome Air Development Center (RADC) this Final Report for Project 7288, Adaptive Interfaces, Task A. This report is

  17. Kevlar Overwrap Study

    DTIC Science & Technology

    1992-04-01

    Manager, ARDE, INC. as Prime Contractor/Principal Investigator, Physics International as subcontractor for failure modeling computer calculations and Air...Force Astronautics Laboratory (EAFB) for full scale composite vessel testing. In addition, important contributions were made by Dr. Yen Pan...34 0 AND 22" 0 PSC VESSEL TESTS E-i E.1 - FULL SCALE COMPOSITE VESSEL E-1 TESTS - INSTRUMENTATION REQUIREMENTS/PROCEDURES E.2 - 16" 0 AND 22" 0 PSC

  18. 75 FR 41087 - Conforming Changes to Applicant Submission Requirements; Implementing Federal Financial Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-15

    ... Report and Central Contractor Registration Requirements AGENCY: Office of the Secretary, HUD. ACTION... codifies the requirement that applicants for HUD assistance possess an active Central Contractor... conform the reporting requirements to those provided for by the FFR. B. Requirement for Central Contractor...

  19. THE POSITIVE IMPACTS OF AMERICAN REINVESTMENT AND RECOVERY ACT (ARRA) FUNDING TO THE WASTE MANAGEMENT PROGRAM ON HANFORD'S PLATEAU REMEDIATION PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BLACKFORD LT

    In April 2009, the Department of Energy (DOE) Richland Operations Office (RL) was allocated $1.6 billion (B) in ARRA funding to be applied to cleanup projects at the Hanford Site. DOE-RL selected projects to receive ARRA funding based on 3-criteria: creating/saving jobs, reducing the footprint of the Hanford Site, and reducing life-cycle costs for cleanup. They further selected projects that were currently covered under regulatory documents and existing prime contracts, which allowed work to proceed quickly. CH2M HILL Plateau Remediation Company (CHPRC) is a prime contractor to the DOE focused on the environmental cleanup of the DOE Hanford Site Centralmore » Plateau. CHPRC was slated to receive $1.36B in ARRA funding. As of January, 2010, CHPRC has awarded over $200 million (M) in subcontracts (64% to small businesses), created more that 1,100 jobs, and touched more than 2,300 lives - all in support of long-term objectives for remediation of the Central Plateau, on or ahead of schedule. ARRA funding is being used to accelerate and augment cleanup activities already underway under the baseline Plateau Remediation Contract (PRC). This paper details challenges and accomplishments using ARRA funding to meet DOE-RL objectives of creating/saving jobs, expediting cleanup, and reducing lifecycle costs for cleanup during the first months of implementation.« less

  20. 23 CFR 230.204 - Implementation of supportive services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... majority and minority contractors, contractors' associations, minority groups, and other persons or..., such as technical assistance, managerial assistance, counseling, certification assistance, and follow...

  1. Contractor and government - Teamwork and commitment

    NASA Technical Reports Server (NTRS)

    Griffin, G. D.

    1985-01-01

    Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.

  2. Prime Contract Awards by Service Category and Federal Supply Classification, Fiscal Years 1973, 1974, 1975, 1976.

    DTIC Science & Technology

    1976-11-09

    most of the steel plate for ships is purchased by Defense prime contractors, and only a small portion is obtained by direct DoD purchase (see Code 9515...7.14S 9,0St U29 TRAINING OF GOVT PERSONNEL OTHER THAN U621-UG26 26, h13 4.7,63S 215,165 61,603 ’ TOTAL 86,092 116,316 333,121 145,039 V4...S5 M4AFID TOOLS 2.566 4,696 4,SS6 11,206 S2 EASURING TOOLS 1,46S LS6L 1,S94 16 a3 S3 MARONARE AND ABRASIVES 2 364Y 37,967 4.534 o.26 6 54

  3. Should PUS Standard Evolve?

    NASA Astrophysics Data System (ADS)

    Fourtier, Ph.; Nodet, J.; Garcia, G.

    2008-08-01

    Based on practical experience, the current paper presents position of Thales Alenia Space as a prime contractor, on the use of PUS standard. Questions have raised during past and present applications, which could be justifications for evolutions of the standard. This kind of reporting could be one of the entries for a reactivation of a working group on the PUS standard, taking into account significant experiences accumulated on diverse programs since early 2000.

  4. Crew Training - Apollo 9 - Grumman Aircraft Eng. Corp. (GAEC)

    NASA Image and Video Library

    1969-01-25

    S69-17615 (25 Jan. 1969) --- Astronaut Russell L. Schweickart, lunar module pilot of the Apollo 9 prime crew, participates in a press conference at the Grumman Aircraft Engineering Corporation. Grumman is the contractor to NASA for the Lunar Module. Schweickart is holding a model of a docked Lunar Module/Command and Service Modules. The Apollo 9 mission will evaluate spacecraft lunar module systems performance during manned Earth-orbital flight.

  5. Process Product Integrity Audits: A Hardware Auditing Technique for the '90s'

    NASA Technical Reports Server (NTRS)

    Taylor, Mike

    1994-01-01

    The Space Shuttle program has experienced hardware problems that have delayed several shuttle launches. A NASA review determined that the problems could have been prevented. NASA further concluded that a new kind of Quality emphasis at all Space Shuttle prime contractors and subcontractors was necessary to ensure mission success. To meet this challenge, NASA initiated an innovative review process called Process/Product Integrity (PPIA).

  6. Commercializing the transfer orbit stage

    NASA Technical Reports Server (NTRS)

    Miller, M. W.

    1984-01-01

    Key milestones necessary to establish the transfer orbit stage are examined. The selection of the project concept and synthesis of the company are described followed by an analysis venture capability support and the selection of a major aerospace company as prime contractor. A landmark agreement with NASA sanctioned the commercial TOS concept and provided the critical support necessary to raise the next round of venture capital. Project management and customer commitments are also discussed.

  7. A Modular and Configurable Instrument Electronics Architecture for "MiniSAR"- An Advanced Smallsat SAR Instrument

    NASA Astrophysics Data System (ADS)

    Gomez, Jaime; Pastena, Max; Bierens, Laurens

    2013-08-01

    MiniSAR is a Dutch program focused on the development of a commercial smallsat featuring a SAR instrument, led by SSBV as prime contractor. In this paper an Instrument Electronics (IEL) system concept to meet the MiniSAR demands is presented. This system has several specificities wrt similar initiatives in the European space industry, driven by our main requirement: keep it small.

  8. Composite Ceramic Superconducting Wires for Electric Motor Applications

    DTIC Science & Technology

    1989-07-07

    generators that have been built using NbTi superconducting wire at liquid 3 helium temperature (4.2*K). Most of these magnets , motors, and generators have...temperature superconductors. A magnetic diffusivity value cannot be rigorously determined for the superconductor in the superconducting state when flux jump...cv, FIRST ANNUAL REPORT FOR THE PROJECT "COMPOSITE CERAMIC SUPERCONDUCTING WIRES FOR ELECTRIC MOTOR APPLICATIONS" 2 PRIME CONTRACTOR CERAMICS PROCESS

  9. DoD Source Selection: Competencies, Deficiencies, and Remedies

    DTIC Science & Technology

    2014-04-30

    University, Ministry of National Defense, Republic of China Strategic Planning and Management in Defense Systems Acquisition Stanley Rosen, Defense... systems procurement officer. He was employed in purchasing management for prime contractors on NASA’s Hubble Space Telescope, DoE’s Positron Electron...was living the good life, “he … was squandering precious tax dollars for, among other things, systems the military didn’t ask for, didn’t need and

  10. Can Profit Policy and Contract Incentives Improve Defense Contract Outcomes?

    DTIC Science & Technology

    2008-10-01

    a metric that estimates the returns required by investors. The weighted average cost of capital ( WACC ) is the standard financial statistic that...weights the returns demanded by investors that hold equity and investors that hold debt.6 Like FCFROIC, WACC is expressed as a percentage. Consequently...previous year. 5 These defense prime contractors include Lockheed, Raytheon, Northrop Grumman, and General Dynamics. 6 Mathematically, WACC = Debt/(Debt

  11. Artist concept of the Hubble Space Telescope (HST) after STS-31 deployment

    NASA Image and Video Library

    1988-09-21

    Artist concept shows the Hubble Space Telescope (HST) placed in orbit above the Earth's distorting layer of atmosphere by Discovery, Orbiter Vehicle (OV) 103, during mission STS-31. Tracking and data relay satellite (TDRS) is visible in the background and ground station is visible below on the Earth's surface. HST is the first of the great observatories to go into service and one of NASA's highest priority scientific spacecraft. Capable of observing in both visible and ultraviolet wavelengths, HST has been termed the most important scientific instrument ever designed for use on orbit. It will literally be able to look back in time, observing the universe as it existed early in its lifetime and providing information on how matter has evolved over the eons. The largest scientific payload ever built, the 12 1/2-ton, 43-foot HST was developed by Lockheed Missiles & Space Company, spacecraft prime contractor, and Perkin-Elmer Corporation, prime contractor for the optical assembly. The European Space Agency (ESA) furnished the power generating solar array and one of the system's five major instruments. Marshall Space Flight Center (MSFC) manages the HST project; Goddard Space Flight Center (GSFC) will be responsible, when the spacecraft is in orbit, for controlling the telescope and processing the images and instrument data returns.

  12. 48 CFR 244.305-70 - Granting, withholding, or withdrawing approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... or planned decision to grant or withhold approval of the contractor's purchasing system. (b) The PSA... contractor of the decision within ten days after receipt of the report with a copy of the decision to the PSA... request the PSA to verify that the contractor has— (i) Corrected the deficiencies; and (ii) Implemented...

  13. All Prime Contract Awards by State or Country, Place, and Contractor, FY83, Part 2 (Kingman, Arizona-Petaluma, California).

    DTIC Science & Technology

    1983-01-01

    2610 000 A48 TIRES & TUBES PNEUMATIC EXCE 5 A 3 3 A 0000 0 J 1 A 42 4 )7 2017 DAAEO7-83-CO156 B C A 5 2 2 2610 000 A4B TIRES & TUBES PNEUMATIC EXCE 5 A...OAAO3 0037 OAAAO3-63-CO028 B C B 5 2 2 5610 000 B1 MINERAL CONSTRUCTION MATERIA 8 A 3 4 J O1B 1B J 1 B 32 COOPER TIRE & RUBBER CO TEXARKANA ARKANSAS...PNEUMATIC EXCE 5 A 3 3 J 0000 0 J 1 G 136 CONTRACTOR TOTAL 7 2,224 RIO AIR SERVICE INC TEXARKANA ARKANSAS 089236 3950 04 4 B 00600 1731 DLAeOO-82

  14. All Prime Contract Awards by State or Country, Place, and Contractor, FY83, Part 4 (Washington, D.C.-Lafayette, Indiana).

    DTIC Science & Technology

    1983-01-01

    6 3 J 0000 0 J 1 E 31 DADE AUTO PARTS CECIL FIELD NAS FLORIDA 078626 0585 10 2 K T4O? 0001 NOO612-61-DOT3S B C B 5 2 2 2990 000 A45 MISC ENGINE...INC JACKSONVILLE FLORIDA 002436 1740 10 0 TAIlO 0050 NOSB36-83-DO006 A C C 5 2 2 R399 000 S1 OTHER ADP SERVICES 8 A 4 4 J 018 1 B J I A 81 DE AUTO ...000 C9E BOOKS AND PAMPHLETS 3 6 4 1 J 80 CONTRACTOR TOTAL 3 216 ZIEBART AUTO RUSTPROOFING MI SHAWAK ATLANTA GEORGIA 089890 0290 11 1 I OHA09 0006

  15. Pressure Safety Program Implementation at ORNL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lower, Mark; Etheridge, Tom; Oland, C. Barry

    2013-01-01

    The Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) facility that is managed by UT-Battelle, LLC. In February 2006, DOE promulgated worker safety and health regulations to govern contractor activities at DOE sites. These regulations, which are provided in 10 CFR 851, Worker Safety and Health Program, establish requirements for worker safety and health program that reduce or prevent occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites. The regulations state that contractors must achieve compliance no later than May 25, 2007. According tomore » 10 CFR 851, Subpart C, Specific Program Requirements, contractors must have a structured approach to their worker safety and health programs that at a minimum includes provisions for pressure safety. In implementing the structured approach for pressure safety, contractors must establish safety policies and procedures to ensure that pressure systems are designed, fabricated, tested, inspected, maintained, repaired, and operated by trained, qualified personnel in accordance with applicable sound engineering principles. In addition, contractors must ensure that all pressure vessels, boilers, air receivers, and supporting piping systems conform to (1) applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (2004) Sections I through XII, including applicable code cases; (2) applicable ASME B31 piping codes; and (3) the strictest applicable state and local codes. When national consensus codes are not applicable because of pressure range, vessel geometry, use of special materials, etc., contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local codes. This report documents the work performed to address legacy pressure vessel deficiencies and comply with pressure safety requirements in 10 CFR 851. It also describes actions taken to develop and implement ORNL’s Pressure Safety Program.« less

  16. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1982.

    DTIC Science & Technology

    1982-01-01

    CONTRAVES GOEPZ CORP 309 8 FAIRCHILD CAMERA & INSTRUMENT CORP 101 B CONTROL DATA CORP 79 B FAIRCHILD INDUSTRIES IN^ 173 N CORNELL UN "’RSITY 249 B...MASS 530 383 MEGAPULSE INC S 1,276 - BEDFORD MASS 1.276 360 OPTI METRICS INC S 1,4S5 ANN ARSOR MICHIGAN 433 385 CONTRAVES GOERZ CORP 1,266 WHITE

  17. Effect of Prime Contractor Financial Position on Major Weapon System Cost and Delivery Performance

    DTIC Science & Technology

    1990-12-01

    financial healh , before before and during both development and production phases of a program. Major findings indicate that a relationship does exist...curves were constructed for 35 major military aircraft and missile weapon systems to operationalize the concept of pricing strategy. [Ref. 4:p. 14]. To...Meaningfulness of coefficients, i.e., predictors must have "correct" coefficient signs. The following discriminarit model resulted: Concept Ratio

  18. Tackling sun intrusion: a challenge of close collaboration of thermal, mechanical, structural and optical engineers

    NASA Astrophysics Data System (ADS)

    Kroneberger, Monika; Calleri, Andrea; Ulfers, Hendrik; Klossek, Andreas; Goepel, Michael

    2017-09-01

    The Meteosat Third Generation (MTG) program will ensure the continuity and enhancement of meteorological data from geostationary orbit as currently provided by the Meteosat Second Generation (MSG) system. OHB-Munich, as part of the core team consortium of the industrial prime contractor for the space segment Thales Alenia Space (France), is responsible for the Flexible Combined Imager - Telescope Assembly (FCI-TA) as well as the Infrared Sounder (IRS).

  19. Intelsat satellite scheduled for launch

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The launch schedule for Intelsat 5-B, the prime Intelsat satellite to provide communications services between the Americas, Europe, the Middle East, and Africa, is presented. The planned placement of the satellite into an elliptical transfer orbit, and circularization of the orbit at geosynchronous altitude over the equator are described. Characteristics of the Atlas Centaur launch vehicle, AC-56, are given. The launch operation is summarized and the launch sequence presented. The Intelsat team and contractors are listed.

  20. Orion European Service Module (ESM) Development, Integration and Qualification Status

    NASA Technical Reports Server (NTRS)

    Berthe, Philippe; Over, Ann P.; Picardo, Michelle; Byers, Anthony W.

    2017-01-01

    ESA and the European Industry are supplying the European Service Module for Orion. An overview of the system and subsystem configuration of the Orion European Service Module (ESM) as designed and built for the EM-1 mission is provided as well as an outline of its development, assembly, integration and verification process performed by ESA and NASA in coordination with their respective Industrial prime contractors, Airbus Defence and Space and Lockheed Martin.

  1. Town Hall Meeting Presentation

    NASA Technical Reports Server (NTRS)

    Mather, John C.

    2002-01-01

    The James Webb Space Telescope (JWST), formerly known as the Next Generation Space Telescope (NGST), will be the successor to the Hubble Space Telescope. It will carry 3 instruments to a deep space orbit around the Sun-Earth Lagrange point L2, and will cover the wavelength range from 0.6 to 28 microns. The design concepts and current status of the project will be summarized, including the telescope and observatory contract proposed by the new prime contractor, TRW.

  2. Feds deed Ward Valley site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-06-12

    This article is a review of the efforts to site a low-level waste repository in California. To resolve a long-running dispute, the US Government has agreed to deed to the state 1000 acres of land in the Mohave Desert. It was noted that environmentalists are unhappy with this action, and it was also noted by the prime contractor (US Ecology) that the facility can be finished six to nine months after the legal challenges are finished.

  3. 75 FR 76260 - Conforming Changes to Applicant Submission Requirements; Implementing Federal Financial Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... Report and Central Contractor Registration Requirements AGENCY: Office of the Secretary, HUD. ACTION... that applicants for HUD assistance possess an active Central Contractor Registration (CCR). HUD is...

  4. 76 FR 82240 - Implementing the Provisions of the Communications Act of 1934, as Enacted by the Twenty-First...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... purchased from the Commission's duplicating contractor at Portals II, 445 12th Street SW., Room CY- B402, Washington, DC 20554. Customers may contact the Commission's duplicating contractor at its web site, www... duplicating contractor, Best Copy and Printing, Inc., 445 12th Street SW., Room CY-B402, Washington, DC 20554...

  5. 48 CFR 23.900 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... WORKPLACE Contractor Compliance With Environmental Management Systems 23.900 Scope. This subpart implements the environmental management systems requirements for contractors. ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scope. 23.900 Section 23...

  6. 48 CFR 23.900 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... WORKPLACE Contractor Compliance With Environmental Management Systems 23.900 Scope. This subpart implements the environmental management systems requirements for contractors. ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scope. 23.900 Section 23...

  7. 48 CFR 23.900 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... WORKPLACE Contractor Compliance With Environmental Management Systems 23.900 Scope. This subpart implements the environmental management systems requirements for contractors. ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scope. 23.900 Section 23...

  8. 48 CFR 23.900 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... WORKPLACE Contractor Compliance With Environmental Management Systems 23.900 Scope. This subpart implements the environmental management systems requirements for contractors. ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scope. 23.900 Section 23...

  9. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY83, Part 6 (Johnson Textile & Plastics Co-McKee Robert E Gen Contractor).

    DTIC Science & Technology

    1983-01-01

    M15 0 INC TEXARKANA TEXAS 093818 7840 44 147-83-C0101 D C E 1 2 2 Y129 000 C2 CONSTRUCTION/OTHER AIRFIELD 8 A 3 4 J 018 1 B J 1 1 76 JOWETT INC 147...RENTAL OF EQ/ADP EQUIP 8 A 4 5 J 1013 5 B J 1 I 3u. KETRON INC ION TOTAL 3 825 2 F D2701 1053 N00039-8, 2 D PAlO 1345 N00140- TEXARKANA TEXAS 029859...F4265C KIEBCO FOODS INC 1 4 J 0013H 2017 DLA131 4 J 0013H 2026 DLA13) .1STING OCTOBER - SEPTEMBER FY 83. PAGE 4137 MPC613 ALPHABETIC I I SM 222 V 0

  10. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY83, Part 9 (Smith S J Co Inc-Univar Corp).

    DTIC Science & Technology

    1983-01-01

    PURPOSE 3 6 4 1 H LOCATION TOTAL 2 65 SOFIS EQUIPMENT CO TEXARKANA TEXAS 088852 7840 44 1 A OAG47 0059 DAAG47-83-CO022 0 C E 1 3 2 Y159 000 C2...8905 000 52 MEAT POULTRY AND FISH 6 2 3 5 J 09 1 B I I LOCATION TOTAL 19 1,205 SOFTWARE ASSOCIATES INC TEXARKANA TEXAS 018565 7840 44 1 I 0A347 0191...CONTRACTORS INC TEXARKANA TEXAS 070213 7840 44 1C 0AG47 0095 DAAG47-83-CO033 D C E 1 2 2 Z152 000 C2 MAINT-REPAIR-ALTER/MAINTENAN 8 A 3 4 J O1B I B J 1 C 132

  11. Korea Earth Observation Satellite Program

    NASA Astrophysics Data System (ADS)

    Baek, Myung-Jin; Kim, Zeen-Chul

    via Korea Aerospace Research Institute (KARI) as the prime contractor in the area of Korea earth observation satellite program to enhance Korea's space program development capability. In this paper, Korea's on-going and future earth observation satellite programs are introduced: KOMPSAT- 1 (Korea Multi Purpose Satellite-1), KOMPSAT-2 and Communication, Broadcasting and Meteorological Satellite (CBMS) program. KOMPSAT-1 satellite successfully launched in December 1999 with Taurus launch vehicle. Since launch, KOMPSAT-1 is downlinking images of Korea Peninsular every day. Until now, KOMPSAT-1 has been operated more than 2 and half years without any major hardware malfunction for the mission operation. KOMPSAT-1 payload has 6.6m panchromatic spatial resolution at 685 km on-orbit and the spacecraft bus had NASA TOMS-EP (Total Ozone Mapping Spectrometer-Earth Probe) spacecraft bus heritage designed and built by TRW, U.S.A.KOMPSAT-1 program was international co-development program between KARI and TRW funded by Korean Government. be launched in 2004. Main mission objective is to provide geo-information products based on the multi-spectral high resolution sensor called Multi-Spectral Camera (MSC) which will provide 1m panchromatic and 4m multi-spectral high resolution images. ELOP of Israel is the prime contractor of the MSC payload system and KARI is the total system prime contractor including spacecraft bus development and ground segment. KARI also has the contract with Astrium of Europe for the purpose of technical consultation and hardware procurement. Based on the experience throughout KOMPSAT-1 and KOMPSAT-2 space system development, Korea is expecting to establish the infrastructure of developing satellite system. Currently, KOMPSAT-2 program is in the critical design stage. are scheduled to launch in 2008 and in 2014, respectively. The mission of CBMS consists of two areas. One is of space technology test for the communications mission, and the other is of a real- time environmental observation for meteorological mission on the geosynchronous orbit for public services. The CBMS is expected to weigh about 2 ~ 2.5 tons, and 6 channels of Ka-band and S- band transponder are equipped for communications service and observation payloads such as meteorological and ocean sensors. To increase the reliability of the first CBMS, a cooperative development with advanced foreign companies of the space business is being considered.

  12. 75 FR 33237 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... from DCMA insurance/pension specialists and DCAA auditors, determines a CIPR is needed based on a risk... needs to follow up on contractor implementation of prior CIPR recommendations. (c) The DCAA auditor...

  13. Product Line Acquisition in the DoD: The Promise, The Challenges

    DTIC Science & Technology

    1999-12-01

    Organizational Structure 8 3.4 Providing an Appropriate Funding Model 9 3.5 Developing and Implementing an Acquisition Strategy 10 3.6 Contractor Interface...providing an appropriate funding model • achieving the right organizational structure • developing and implementing an acquisition strategy • contractor...organizational change rather than attempt a risky enterprise overhaul. 3.4 Providing an Appropriate Funding Model The funding model is closely

  14. Missile Defense: Assessment of DODs Reports on Status of Efforts and Options for Improving Homeland Missile Defense

    DTIC Science & Technology

    2016-02-17

    However, MDA may encounter challenges with the RKV’s contract strategy, industry collaboration efforts, and schedule because MDA has not yet...negotiated the terms of the RKV modification with the prime contractor, is relying on potential industry competitors to collaborate on developing the RKV...interfaces and standards for its subsystems, called modules. Under the DSC, MDA plans to form a cross industry team consisting of Boeing, Raytheon, and

  15. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1975.

    DTIC Science & Technology

    1975-01-01

    NEN ENGLAND EOUTPHENT CO INC • 269 8 PULSEPONER SYSTENS INC TPA N NEW NEXICO INSTITUTE WINING + TECH * 151 N PUROUE RESEARCH FOUNDATION q- NMEN MEXICO...ANAQOSf S u SHALL USyNeESS -1T -- U - - e* I.- U~ SE~tION I -U.S. aUSINEsS 3 IRMS FISCAL Ville 1979 RawN low Or G.ATOR THOUSANOS . 044K NAME OF

  16. Proceedings of the Systems Reengineering Technology Workshop (4th) held in Monterey, California on February 8 - 10, 1994

    DTIC Science & Technology

    1994-09-01

    report for the Properties of User Interface Software Architetures ", draft DISCUS Working Group, Programmers Tutorial, MITRE paper, SEI. Carnegie...execution that we have defined called asynchronous remote procedure call (ARPC) [15], which allows concurrency in amounts proportional to the amount of...demonstration project to use STARS DoD software budget and the proportion concepts. IBM is one of the prime is expected to be increased during the contractors

  17. Driving Technological Surprise: DARPA’s Mission in a Changing World

    DTIC Science & Technology

    2013-04-01

    a plethora of new weapons and techniques in the hands of many types of actors can and do threaten our way of life and endanger our democracy in...global affairs. And a look into the future only adds uncertainty. The proliferation of nuclear, chemical, and biological weapons of mass destruction...electronic device is likely to get to the Warfighter when a prime contractor incorporates it into a weapon system development contract. In some cases, the

  18. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 10 (Germer Equipment Co-Hamilton Hilton National Wembley)

    DTIC Science & Technology

    1990-01-01

    m’ 1) 00 00 00 m 1-r 0" ’m2 II ON ’r- - .- - C LOOcOaOC C> CC’m CI- t t mI ’U ’r 0(1 )0 - LN U L6 L, -4 0)C𔃼C𔃼( MPC4 C-’UN L 400 01-41 m2 T "O ’U 0

  19. Why I Won’t Be a Prime Contractor

    DTIC Science & Technology

    2015-02-01

    notes, see “Contra Proferentem and the Christian Doctrine,” below.) Rules: Uniform Commercial Code ( UCC )—270 pages Note: The UCC deals with multiple...Christian Doctrine,” below.) Rate of Rule Change: Article 2 of the UCC was issued in 2002. Potential Solicitation Provisions and Contract Clauses that may...excluding alternates: UCC 0 Notes: • On two occasions in the last four years, I have had written contracts containing clauses. One of those two

  20. A Management Strategy for the Naval Administrative Telephone System,

    DTIC Science & Technology

    1985-03-01

    story [Ref. 17]: " What the government wants is a one-stop telecommunica- tions company1 operated by a single prime contractor, that can provide and...examines the various system and environmental factor which impact upon a selection of a management strategy, and with- in the constraints imposed by...resolution technique embodied in the age-old adage "divide and conquer." The key premise of this technique is that if a complex ( macro -) problem is

  1. KSC-2012-3111

    NASA Image and Video Library

    2012-05-23

    CAPE CANAVERAL, Fla. – Joanne Maguire, executive vice president of Space Systems for Lockheed Martin, and Kennedy Space Center Director Bob Cabana, far right, are accompanied by Lockheed Martin and NASA personnel during a tour of Kennedy's Operations and Checkout Building. Lockheed Martin is the prime contractor to NASA for the Orion Multi-Purpose Crew Vehicle, which will be processed in the refurbished Operations and Checkout building. For more information, visit http://www.nasa.gov/exploration/systems/ground. Photo credit: NASA/Jim Grossmann

  2. KSC-2012-3112

    NASA Image and Video Library

    2012-05-23

    CAPE CANAVERAL, Fla. – Lockheed Martin and NASA personnel accompany Joanne Maguire, executive vice president of Space Systems for Lockheed Martin, and Kennedy Space Center Director Bob Cabana, far right, during a tour of Kennedy's Operations and Checkout Building. Lockheed Martin is the prime contractor to NASA for the Orion Multi-Purpose Crew Vehicle, which will be processed in the refurbished Operations and Checkout building. For more information, visit http://www.nasa.gov/exploration/systems/ground. Photo credit: NASA/Jim Grossmann

  3. Prime Contract Awards Over $25,000 by Major System, Contractor and State, FY83.

    DTIC Science & Technology

    1983-01-01

    SERVICES 3,074 VO R513 STUDIES/FEASIBILITY - NON- CONSTRUCTION 125 VO T013 TECHNICAL WRITING 1,347 VO 1560 AIRFRAME STRUCTURAL COMPONENTS 6,825 VO 1620...INC NCAR 1670 PARACHUTES RECOVERY SYS AND TIE DOWN EQ 49 ROCKWELL INTERNATIONAL CORP CALIF Y19 CONSTR: CONSTRUCTION /OTHER AIRFIELD STRUCTURES 28,480...INC NEW Y 1560 AIRFRAME STRUCTURAL COMPONENTS 36 GANAR INDUSTRIES I NC CALIF 1680 MISCL AIRCRAFT ACCESSORIES COMPONENTS 180 GARRETT CONSTRUCTION CO

  4. Alphabetic List of All DoD Prime Contractors (No Dollars), FY84.

    DTIC Science & Technology

    1984-01-01

    ALDEN SALES CO ALFRED A YEE DIV LEO A DALY ALBERICI J S CONSTRUCTION CO ALDER FOOD DISTRIBUTORS ALFRED KAERCHER, ALBERS BOB CONSTRUCTION INC ALDERMAN...LABORATORIES INC BISSON LUCIEN INC BILDON INC BIOMETALLICS BITO LAGERTECHNIK BITTMANN GMB BILFINGER & BERGER BIONETICS CORP THE BITTINGER W E CO BILKE OIL CO...ROOT INC BROWN LEARY INC BROOK PETROLEUM INC BROWN & SHARPE INTL CAPITAL BROWN LEO CONSTRUCTION CO INC BROOKDALE COMMUNITY BROWN & SHARPE MFG CO

  5. Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program

    NASA Technical Reports Server (NTRS)

    Johnstone, Paul M.; Blomberg, Richard D.; Gleghorn, George J.; Krone, Norris J.; Voltz, Richard A.; Dunn, Robert F.; Donlan, Charles J.; Kauderer, Bernard M.; Brill, Yvonne C.; Englar, Kenneth G.; hide

    1996-01-01

    At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.

  6. Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

    NASA Technical Reports Server (NTRS)

    Brothers, Mary Ann; Safie, Fayssal M. (Technical Monitor)

    2002-01-01

    NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

  7. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  8. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  9. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  10. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  11. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  12. Dollar Summary of Prime Contract Awards by Contractor, State or Country, and Place, FY84, Part 6, (Magnasync/Moviola Corp-Parker Marine Contracting).

    DTIC Science & Technology

    1984-01-01

    11111220 11111_L 5 . 1161 ]lllI ’° lh Ŝ MICROCOPY RESOLUTION TESI CHART N10iANAL hR111 I~ A S-7 DOLLAR SUMMARY OF PRIME CONTRACT AWARDS BY...STATE ill C!I- 0C’ 83 -- 0A9/ 1 392.’ u ’൛ / R ,’ :,q u 1 1’ LIM i -I EE; IF < _ . I’MN DE ’, CCLt , ,. DE SERVICE C O CRANO CjRiɠ AR 6 0 N DAKY1...8217:CCFORTECFORT LAJI)FRJALr <CI I DE INOROATDPANAMA C’T" FL OR ID W. 053 * ICORPORATED POMERET Mfl AN 34- N;CCPORA TED ROCKVILLE MAP)YlAN .:I 2 IlOPF’RATED NEwp)RT

  13. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY83, Part 10 (Universal Aircraft Parts Inc-Zytron Corp).

    DTIC Science & Technology

    1983-01-01

    FIELDS & ALI 33-88 B C B 5 2 2 J070 000 A7 MAINT-REPAIR OF EQ/ADP EQUIP 3 6 4 1 1 K OCAO 0029 DAC , 33-88 B C A 5 3 2 W070 000 $1 LEASE-RENTAL OF EQ...D OCW63 0071 DAC 83-C0414 B C Z 5 3 2 S206 000 SI GUARD SERVICES 7 9 3 5 L 06 1 B J 2 D 83-C0450 B C Z 5 3 2 S206 000 Si GUARD SERVICES 7 9 7 5 L 06...C2470 J085 N62’ CONTRACTOR TOTAL 9 1,541 WALLER TODD & SADLI LA JUNTA COLORADO 040309 1520 06 1 C OCA65 0055 DAC 0-82-D4446 E C B 5 3 2 9140 000 A8A

  14. Orion GN and C Model Based Development: Experience and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Jackson, Mark C.; Henry, Joel R.

    2012-01-01

    The Orion Guidance Navigation and Control (GN&C) team is charged with developing GN&C algorithms for the Exploration Flight Test One (EFT-1) vehicle. The GN&C team is a joint team consisting primarily of Prime Contractor (Lockheed Martin) and NASA personnel and contractors. Early in the GN&C development cycle the team selected MATLAB/Simulink as the tool for developing GN&C algorithms and Mathworks autocode tools as the means for converting GN&C algorithms to flight software (FSW). This paper provides an assessment of the successes and problems encountered by the GN&C team from the perspective of Orion GN&C developers, integrators, FSW engineers and management. The Orion GN&C approach to graphical development, including simulation tools, standards development and autocode approaches are scored for the main activities that the team has completed through the development phases of the program.

  15. OSD’s Obligation and Expenditure Rate Goals: An Examination of the Factors Contributing to the Interference

    DTIC Science & Technology

    2013-07-01

    or other prerequisite events 44% 32% 59% 46% 11% F22 DCAA administrative actions 44% 33% 60% 45% 10% F23 Unplanned congressional adds to PB request...Management Agency (DCMA) administration actions (F36) and Defense Contract Audit Agency (DCAA) administra- tion ( F22 ). Three contract-related factors...of business/finance personnel F31 Programmatic conflicts between government and prime contractor .81 76% Administrative Actions: F36 DCMA & F22 DCAA

  16. Saturn Apollo Program

    NASA Image and Video Library

    1968-01-01

    This view depicts engineers conducting a system test on the Saturn V instrument unit (IU) at International Business Machines (IBM) in Huntsville, Alabama. IBM is a prime contractor for development and fabrication of the IU. The IU is vital to the proper flight of the vehicle. It contains navigation, guidance, control, and sequencing equipment for the launch vehicle. Three-feet tall, twenty-one feet in diameter, and weighing about 4,000 pounds, the IU is mounted atop the S-IVB (third) stage, between the S-IVB stage and the Apollo spacecraft.

  17. High Energy Astronomy Observatory (HEAO)

    NASA Image and Video Library

    1978-01-01

    This photograph was taken during the assembly of the High Energy Astronomy Observatory (HEAO)-2 at TRW, Inc., the prime contractor for the HEAOs. The HEAO-2, the first imaging and largest x-ray telescope built to date, was capable of producing actual photographs of x-ray objects. TRW, Inc. designed and developed the HEAO, under the project management of the Marshall Space Flight Center. The HEAO-2 was originally identified as HEAO-B but the designation was changed once the spacecraft achieved orbit.

  18. All Prime Contract Awards by State or Country, Place and Contractor. Part 13. (Akron, New York-Yorktown Heights, New York)

    DTIC Science & Technology

    1989-01-01

    34 . .~ . ........... 11 .... )........P: < <C < 1<ɜ<<<CE<c U (71) < E<<<<< <<<t<<<c c H J-4Cl)0 61 M -4"< I M-" In LL0I nI I I n.L. LL i ( u. LLna . Injn.. ) nI nInI ni

  19. Prime Contract Awards Alphabetically by Contractor, By State or Country, and Place, FY 84. Part 10. (Southern Ambulance Builders - Tucci & Sons, Inc).

    DTIC Science & Technology

    1984-01-01

    9- - 0 C) N’(Y C) 0 - 0) ) C~l00) 0 C) (MCDN Co) -’C’) N, () CmIf U)N c) U ) C) C) 1700D- -’ --- -U -N to) 00 WI . (Di 4- L) I .0 0atoc iD~la 0 0...Y00 E700 ITo ITO o ITOO ITO rTO IT I IO CL-I , - - - - - - .-- - - - - E . . . . . . .0>. M. 2y . * cmIf

  20. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1980.

    DTIC Science & Technology

    1980-01-01

    2624. * ROCKET CENTER "Vg4o6 IN SCIENCE APPLICATIONS- INC 46.97 N4UNTSVILLF ALAMaM 6,736 6 9 mEMO!’ coos 33,4676 4 VUDIA A0170NA Is* 0 LOS1 ANGILTS...CORP Of AMERICA S 1.622 4 NAHUA 4 1,236 * CAN@RROGf NASS 19622 251 SUER, MARINE SVVTEMS 2.130 - . 27 AUSTIN PESEARCk ASSOCIATES 5 los1 ?* eHARLOTTESVILL

  1. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for Research, Development, Test, and Evaluation

    DTIC Science & Technology

    1993-10-01

    development (exploratory, advanced, engineering, operational systems, or management and support services). Full definitions for each of these categories are ...displays the order of ranking for each, and shows how each has been categorized for reporting purposes. The categories are business firm (B...small businesses are further identified by an "S." The net value of awards to each of the firm’s reported locations is also provided. Tables 3, 4, and

  2. Orion EM-1 Booster Preps - Aft Skirt Preps/Painting

    NASA Image and Video Library

    2016-10-28

    A technician with Orbital ATK, prime contractor for the Space Launch System (SLS) Booster, preps a section of the right hand aft skirt for primer and paint in a support building at the Hangar AF facility at Cape Canaveral Air Force Station in Florida. The space shuttle-era aft skirt will be used on the right hand booster of NASA's SLS rocket for Exploration Mission 1 (EM-1). NASA is preparing for EM-1, deep space missions, and the Journey to Mars.

  3. James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Development Status

    NASA Technical Reports Server (NTRS)

    Feinberg, Lee D.

    2004-01-01

    The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is a segmented, cryogenic telescope scheduled for launch in 2011. In September of 2002, NASA selected prime contractor Northrop Grumman Space Technology (NGST) to build the observatory including management of the OTE. NGST is teamed with subcontractors Ball Aerospace, Alliant Techsystems (ATK). and Kodak. The team has completed several significant design, technology, architecture definition, and manufacturing milestones in the past year that are summarized in this paper.

  4. n/a

    NASA Image and Video Library

    1977-09-09

    The first Space Shuttle External Tank, the Main Propulsion Test Article (MPTA), rolls off the assembly line September 9, 1977 at the Michoud Assembly Facility in New Orleans. The MPTA was then transported to the National Space Technology Laboratories in southern Mississippi where it was used in the first static firing of the three main engines. Marshall Space Flight Center had management responsibility for Space Shuttle propulsion elements, including the External Tank. Martin Marietta was the prime contractor who designed and assembled the tanks at Michoud.

  5. NASA 2012 Small Business Industry Awards (SBIA)

    NASA Image and Video Library

    2013-04-23

    NASA Administrator Charles Bolden, left, NASA Associate Administrator for Small Business Programs Glenn A. Delgado, second from left, and NASA Deputy Administrator Lori Garver, right, pose for a photograph with Patricia Rice, Manager, Supplier Diversity, Small Business Liaison Officer & Supplier Development, Pratt & Whitney Rocketdyne, Inc. and Jim Maser, President of Pratt & Whitney Rocketdyne, Inc. of East Hartford, Connecticut after the company was awarded the Large Business Prime Contractor of the Year at NASA Headquarters, Tuesday, April 23, 2013 in Washington. Photo Credit: (NASA/Bill Ingalls)

  6. Re-entry Flight Experiments Lessons Learned - The Atmospheric Reentry Demonstrator ARD

    DTIC Science & Technology

    2007-06-01

    civilian cooperative program was managed by Aerospatiale – Lanceurs Stratégiques et Spatiaux (now EADS – SPACE Transportation) as prime contractor. The...of an Al-alloy structure protected on the cone by Norcoat 62250 FI cork tiles and on the heat-shield by Aleastrasil silica-phenolic tiles (Figure 3... structure of the flight data points are meaningful even if the absolute Kp level is doubtful. Figure 19 shows CFD comparisons at Mach 10. The real gas

  7. All Prime Contract Awards by State or Country, Place, and Contractor, FY 87. Part 2. Agoura Hills, California-Lafayette, California.

    DTIC Science & Technology

    1987-01-01

    OWNGRADING SCHEDULE Approved for public release 4. PERFORMING ORGANIZATION REPORT NUMBER(S) 5. MONITORING ORGANIZATION REPORT NUMBER(S) DIOR/ST11-87...Pr- 2 6a. NAME OF PERFORMING ORGANIZATION 6b. OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION WHS, Directorate for (if applicable) nformation...SPONSORING 1Sb. OFFICE SYMBOL 9. PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION (if applicable) Sc. ADDRESS (City, State, and ZIP Code) 10. SOURCE

  8. Saturn Apollo Program

    NASA Image and Video Library

    1967-11-01

    This image depicts a Boeing worker installing an F-1 engine on the Saturn V S-IC flight stage at the Michoud Assembly Facility (MAF). The Saturn IB and Saturn V first stages were manufactured at the MAF, located 24 kilometers (approximately 15 miles) east of downtown New Orleans, Louisiana. The prime contractors, Chrysler and Boeing, jointly occupied the MAF. The basic manufacturing building boasted 43 acres under one roof. By 1964, NASA added a separate engineering and office building, vertical assembly building, and test stage building.

  9. 48 CFR 1852.234-2 - Earned Value Management System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...

  10. 48 CFR 1852.234-2 - Earned Value Management System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...

  11. 48 CFR 1852.234-2 - Earned Value Management System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...

  12. Defense Contracting Integrity. Opportunities Exist to Improve DOD’s Oversight of Contractor Ethics Programs

    DTIC Science & Technology

    2009-09-01

    NUMBER(S) 12 . DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT 15...Implementing FAR Ethics Rules 10 Table 4: Contractor Responses on Practices Now Required by the FAR for Code of Business Ethics and Conduct 12 Table 5...Fiscal Year 2006 35 Table 12 : Required FAR Components for Contractor Ethics Program Practices 43 Figure Figure 1: DOD Hotline Posters Available

  13. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    NASA Astrophysics Data System (ADS)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  14. A VLSI pipeline design of a fast prime factor DFT on a finite field

    NASA Technical Reports Server (NTRS)

    Truong, T. K.; Hsu, I. S.; Shao, H. M.; Reed, I. S.; Shyu, H. C.

    1986-01-01

    A conventional prime factor discrete Fourier transform (DFT) algorithm is used to realize a discrete Fourier-like transform on the finite field, GF(q sub n). A pipeline structure is used to implement this prime factor DFT over GF(q sub n). This algorithm is developed to compute cyclic convolutions of complex numbers and to decode Reed-Solomon codes. Such a pipeline fast prime factor DFT algorithm over GF(q sub n) is regular, simple, expandable, and naturally suitable for VLSI implementation. An example illustrating the pipeline aspect of a 30-point transform over GF(q sub n) is presented.

  15. A Single-blinded, Randomized Clinical Trial of How to Implement an Evidence-based Treatment for Generalized Anxiety Disorder [IMPLEMENT]--Effects of Three Different Strategies of Implementation.

    PubMed

    Flückiger, Christoph; Forrer, Lena; Schnider, Barbara; Bättig, Isabelle; Bodenmann, Guy; Zinbarg, Richard E

    2016-01-01

    Despite long-standing calls to disseminate evidence-based treatments for generalized anxiety (GAD), modest progress has been made in the study of how such treatments should be implemented. The primary objective of this study was to test three competing strategies on how to implement a cognitive behavioral treatment (CBT) for out-patients with GAD (i.e., comparison of one compensation vs. two capitalization models). For our three-arm, single-blinded, randomized controlled trial (implementation of CBT for GAD [IMPLEMENT]), we recruited adults with GAD using advertisements in high-circulation newspapers to participate in a 14-session cognitive behavioral treatment (Mastery of your Anxiety and Worry, MAW-packet). We randomly assigned eligible patients using a full randomization procedure (1:1:1) to three different conditions of implementation: adherence priming (compensation model), which had a systematized focus on patients' individual GAD symptoms and how to compensate for these symptoms within the MAW-packet, and resource priming and supportive resource priming (capitalization model), which had systematized focuses on patients' strengths and abilities and how these strengths can be capitalized within the same packet. In the intention-to-treat population an outcome composite of primary and secondary symptoms-related self-report questionnaires was analyzed based on a hierarchical linear growth model from intake to 6-month follow-up assessment. This trial is registered at ClinicalTrials.gov (identifier: NCT02039193) and is closed to new participants. From June 2012 to Nov. 2014, from 411 participants that were screened, 57 eligible participants were recruited and randomly assigned to three conditions. Forty-nine patients (86%) provided outcome data at post-assessment (14% dropout rate). All three conditions showed a highly significant reduction of symptoms over time. However, compared with the adherence priming condition, both resource priming conditions indicated faster symptom reduction. The observer ratings of a sub-sample of recorded videos (n = 100) showed that the therapists in the resource priming conditions conducted more strength-oriented interventions in comparison with the adherence priming condition. No patients died or attempted suicide. To our knowledge, this is the first trial that focuses on capitalization and compensation models during the implementation of one prescriptive treatment packet for GAD. We have shown that GAD related symptoms were significantly faster reduced by the resource priming conditions, although the limitations of our study included a well-educated population. If replicated, our results suggest that therapists who implement a mental health treatment for GAD might profit from a systematized focus on capitalization models. Swiss Science National Foundation (SNSF-Nr. PZ00P1_136937/1) awarded to CF.

  16. Not All Parts Are Created Equal: The Impact Of Counterfeit Parts In The Air Force Supply Chain

    DTIC Science & Technology

    2017-04-06

    Government implemented a whole of government approach to tackle this issue. This issue affects both DOD, defense contractors by increasing costs...and oversight to reduce Supply Chain Risk”.2 In other words, the issue has not been resolved. This issue affects both DOD, defense contractors by...U.S. parts distributors that sprang up virtually overnight after Congress did away with requiring primary government contractors to certify all

  17. Surface contamination analysis technology team overview

    NASA Astrophysics Data System (ADS)

    Burns, H. Dewitt, Jr.

    1996-11-01

    The surface contamination analysis technology (SCAT) team was originated as a working roup of NASA civil service, Space Shuttle contractor, and university groups. Participating members of the SCAT Team have included personnel from NASA Marshall Space Flight Center's Materials and Processes Laboratory and Langley Research Center's Instrument Development Group; contractors-Thiokol Corporation's Inspection Technology Group, AC Engineering support contractor, Aerojet, SAIC, and Lockheed MArtin/Oak Ridge Y-12 support contractor and Shuttle External Tank prime contractor; and the University of Alabama in Huntsville's Center for Robotics and Automation. The goal of the SCAT team as originally defined was to develop and integrate a multi-purpose inspection head for robotic application to in-process inspection of contamination sensitive surfaces. One area of interest was replacement of ozone depleting solvents currently used for surface cleanliness verification. The team approach brought together the appropriate personnel to determine what surface inspection techniques were applicable to multi-program surface cleanliness inspection. Major substrates of interest were chosen to simulate space shuttle critical bonding surface or surfaces sensitive to contamination such as fuel system component surfaces. Inspection techniques evaluated include optically stimulated electron emission or photoelectron emission; Fourier transform infrared spectroscopy; near infrared fiber optic spectroscopy; and, ultraviolet fluorescence. Current plans are to demonstrate an integrated system in MSFC's Productivity Enhancement Complex within five years from initiation of this effort in 1992. Instrumentation specifications and designs developed under this effort include a portable diffuse reflectance FTIR system built by Surface Optics Corporation and a third generation optically stimulated electron emission system built by LaRC. This paper will discuss the evaluation of the various techniques on a number of substrate materials contaminated with hydrocarbons, silicones, and fluorocarbons. Discussion will also include standards development for instrument calibration and testing.

  18. Independent Orbiter Assessment (IOA): FMEA/CIL assessment

    NASA Technical Reports Server (NTRS)

    Hinsdale, L. W.; Swain, L. J.; Barnes, J. E.

    1988-01-01

    The McDonnell Douglas Astronautics Company (MDAC) was selected to perform an Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL). Direction was given by the Orbiter and GFE Projects Office to perform the hardware analysis and assessment using the instructions and ground rules defined in NSTS 22206. The IOA analysis featured a top-down approach to determine hardware failure modes, criticality, and potential critical items. To preserve independence, the analysis was accomplished without reliance upon the results contained within the NASA and Prime Contractor FMEA/CIL documentation. The assessment process compared the independently derived failure modes and criticality assignments to the proposed NASA post 51-L FMEA/CIL documentation. When possible, assessment issues were discussed and resolved with the NASA subsystem managers. Unresolved issues were elevated to the Orbiter and GFE Projects Office manager, Configuration Control Board (CCB), or Program Requirements Control Board (PRCB) for further resolution. The most important Orbiter assessment finding was the previously unknown stuck autopilot push-button criticality 1/1 failure mode. The worst case effect could cause loss of crew/vehicle when the microwave landing system is not active. It is concluded that NASA and Prime Contractor Post 51-L FMEA/CIL documentation assessed by IOA is believed to be technically accurate and complete. All CIL issues were resolved. No FMEA issues remain that have safety implications. Consideration should be given, however, to upgrading NSTS 22206 with definitive ground rules which more clearly spell out the limits of redundancy.

  19. Summary Report of the Seventh Annual NASA/Contractors Conference on Quality and Productivity: "Total Quality Leadership"

    NASA Technical Reports Server (NTRS)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity on October 12-13, 1990, in Grenelefe, Florida. The panel presentations and keynote speeches revolving around the theme of 'Total Quality Leadership" provided a solid base of understanding of the importance, benefits, and principles of total quality management. The implementation of these strategies is critical if we are to effectively pursue our mission of continuous quality improvement and reliability in our products, processes, and services. The annual NASA/contractors conferences serve as catalysts for achieving success in this mission.

  20. Space Commercialization Trends and Consequences for the Workforce

    NASA Astrophysics Data System (ADS)

    Peeters, W.

    2002-01-01

    The major trend we are currently witnessing in space activities is an increasing level of commercialization. This trend is emphasized by: consolidation, mergers and forming strategic alliances. In USA, from the 20 major space companies in the 80's only 3 `prime' ones were left by 1997. A similar effect took place in Europe in the 90's, where at present only primarily 2 major space conglomerates are operating at prime contractor level. Such strategic alliances in the first place result in the creation of end-to-end capabilities, with larger internal R&D and broader access to technologies. Due to the bigger financial volume of such conglomerates there is also better access to new capital and sharing of risks. In a second step, we can at present observe the creation of transatlantic alliances to enter the worldwide market. These trends have a considerable effect on the workforce requirements in industry:

  1. Implementing Coordinative Acquisition as a Viable Streamlined Acquisition Process in the Department of Defense (DoD): Will Contractors Participate?

    DTIC Science & Technology

    2006-12-01

    These include equitable estoppel , fair competition, appearance of conflict of interests (government and contractor relationship), and most...importantly, intellectually property rights. Regarding equitable estoppel , one legal definition defines it as follows: “A type of estoppel that bars a

  2. 43 CFR 46.105 - Using a contractor to prepare environmental documents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT OF 1969 Protection and Enhancement of Environmental... contractor to prepare any environmental document in accordance with the standards of 40 CFR 1506.5(b) and (c...) Preparation and adequacy of the environmental documents; and (b) Independent evaluation of the environmental...

  3. 43 CFR 46.105 - Using a contractor to prepare environmental documents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT OF 1969 Protection and Enhancement of Environmental... contractor to prepare any environmental document in accordance with the standards of 40 CFR 1506.5(b) and (c...) Preparation and adequacy of the environmental documents; and (b) Independent evaluation of the environmental...

  4. Contractor Incentives for Success in Implementing Performance-Based Logistics: A Progress Report

    DTIC Science & Technology

    2010-04-30

    amount of risk; this, however, gives the contractor more latitude in determining and applying its methods ( KMC /OPI, 2010). The general consensus...Klevan, P. (2008, October 27). Navy success with PBL. Presentation at the DoD Maintenance Symposium. KMC /OPI. (2010, January 19). Acquisition

  5. NASA on a Strong Roll in Preparing Space Launch System Flight Engines

    NASA Image and Video Library

    2017-08-09

    NASA is on a roll when it comes to testing engines for its new Space Launch System (SLS) rocket that will send astronauts to deep-space destinations, including Mars. Just two weeks after the third test of a new RS-25 engine flight controller, the space agency recorded its fourth full-duration controller test Aug. 9 at Stennis Space Center near Bay St. Louis, Mississippi. Engineers conducted a 500-second test of the RS-25 engine controller on the A-1 Test Stand at Stennis. The test involved installing the controller on an RS-25 development engine and firing it in the same manner, and for the same length of time, as needed during an actual SLS launch. The test marked another milestone toward launch of the first integrated flight of the SLS rocket and Orion crew vehicle. Exploration Mission-1 will be an uncrewed mission into lunar orbit, designed to provide a final check-out test of rocket and Orion capabilities before astronauts are returned to deep space. The SLS rocket will be powered at launch by four RS-25 engines, providing a combined 2 million pounds of thrust, and with a pair of solid rocket boosters, providing more than 8 million pounds of total thrust. The RS-25 engines for the initial SLS flights are former space shuttle main engines that are now being used to launch the larger and heavier SLS rocket and with the new controller. The controller is a critical component that operates as the engine “brain” that communicates with SLS flight computers to receive operation performance commands and to provide diagnostic data on engine health and status. Engineers conducted early prototype tests at Stennis to collect data for development of the new controller by NASA, RS-25 prime contractor Aerojet Rocketdyne and subcontractor Honeywell. Testing of actual flight controllers began at Stennis in March. NASA is testing all controllers and engines designated for the EM-1 flight at Stennis. It also will test the SLS core stage for the flight at Stennis, which will involve installing the stage on the B-2 Test Stand and firing its four RS-25 engines simultaneously, as during an actual launch. RS-25 tests at Stennis are conducted by a team of NASA, Aerojet Rocketdyne and Syncom Space Services engineers and operators. Aerojet Rocketdyne is the RS-25 prime contractor. Syncom Space Services is the prime contractor for Stennis facilities and operations.

  6. Evaluation of the NASA Quality Surveillance System Pilot in Meeting Requirements for Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2002-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  7. Evaluation Of The NASA Quality Surveillance System Pilot In Meeting Requirements For Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2001-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  8. Current practices of construction waste reduction through 3R practice among contractors in malaysia: Case study in penang

    NASA Astrophysics Data System (ADS)

    Ng, L. S.; Tan, L. W.; Seow, T. W.

    2017-11-01

    The effectiveness of the implementation of construction waste reduction through 3R reflects the sustainability in construction waste management. Weak implementation of construction waste reduction through 3R among contractors will lead to unsustainable construction waste management. Increase in construction waste on landfills is critical especially on islands where land is very limited for solid waste disposal. This aim of this paper is to investigate current practice of construction waste reduction through 3R practice among contractors in Penang, Malaysia. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 in Penang and experts from Penang Local Authority, CIDB in Penang and its Headquarters, National Solid Waste Management Department, and Headquarters of Solid Waste and Public Cleansing Management Corporation. Interviews and questionnaire surveys have been found that 3R practice is not mandatory in construction waste management in Penang. Only 39.8% construction contractors practiced 3R in managing their waste. Therefore, 3R practices should be emphasized in construction industry. Reducing wastes through 3R practices in construction industry is a way forward towards sustainable construction waste management especially in expanding the lifetime of landfill.

  9. Safety, reliability, maintainability and quality provisions for the Space Shuttle program

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This publication establishes common safety, reliability, maintainability and quality provisions for the Space Shuttle Program. NASA Centers shall use this publication both as the basis for negotiating safety, reliability, maintainability and quality requirements with Shuttle Program contractors and as the guideline for conduct of program safety, reliability, maintainability and quality activities at the Centers. Centers shall assure that applicable provisions of the publication are imposed in lower tier contracts. Centers shall give due regard to other Space Shuttle Program planning in order to provide an integrated total Space Shuttle Program activity. In the implementation of safety, reliability, maintainability and quality activities, consideration shall be given to hardware complexity, supplier experience, state of hardware development, unit cost, and hardware use. The approach and methods for contractor implementation shall be described in the contractors safety, reliability, maintainability and quality plans. This publication incorporates provisions of NASA documents: NHB 1700.1 'NASA Safety Manual, Vol. 1'; NHB 5300.4(IA), 'Reliability Program Provisions for Aeronautical and Space System Contractors'; and NHB 5300.4(1B), 'Quality Program Provisions for Aeronautical and Space System Contractors'. It has been tailored from the above documents based on experience in other programs. It is intended that this publication be reviewed and revised, as appropriate, to reflect new experience and to assure continuing viability.

  10. All Prime Contract Awards by State or Country, Place, and Contractor, FY83, Part 1 (Argentina-Goodyear, Arizona).

    DTIC Science & Technology

    1983-01-01

    C Z 5 2 2 5110 000 69 HAND TOOLS EDGED NONPOWERED 7 9 3 5 L 06 1 B 4 1 0 100 WAESCHEREI KRAUSE GERMANY 088616 0000 GY I L OJA37 2913 DAJA37-82-00210 B...0 27 WOLFGANG PRAYON GERMANY 090010 0000 GY I D OJA37 0369 DAJA37-82-DO261 B C 2 5 3 2 V212 000 S MOTOR PASSENGER SERVICE 7 9 4 5 L 06 1 B J 1 J 34

  11. Dollar Summary of Prime Contract Awards with Principal Place of Performance Outside the U.S. by Country and Contractor, FY83.

    DTIC Science & Technology

    1983-01-01

    GERMANY 55 55 KOHLEN GRUB GERMANY 9,706 9,706 KOLLER WOLFGANG GERMANY 28 28 KOLLSMANN 0MBN SYSTEM TECHN IK GERMANY 37 37 KONTRO#4 ELEKTRONI C GMBH... KRAUSE GERMANY 56 56 WAGNER GLAS UND GEBAEUDEREINIGUNG GERMANY 374 374 WAGNER GMSM GERMANY 138 136 WAGNER H GERMANY 570 570 WAGNER H a S GARTEN... WOLFGANG PRAYON GERMANY 34 34 WOLLERSHE I M ALFRED GERMANY 47 47 WORMSER AUIOBUSSETRI ED GERMANY 178 178 WUERSCHINGER HANS GERMANY 73 73 WUEST BAU

  12. Saturn Apollo Program

    NASA Image and Video Library

    1967-10-01

    This is a view of the Saturn V instrument unit (IU) being manufactured in the east high bay at International Business Machines (IBM) in Huntsville, Alabama. IBM is a prime contractor for development and fabrication of the IU. The IU is vital to the proper flight of the vehicle. It contains navigation, guidance, control, and sequencing equipment for the launch vehicle. Three feet tall, twenty-one feet in diameter, and weighing about 4,000 pounds, the IU is mounted atop the S-IVB (third) stage, between the S-IVB stage and the Apollo spacecraft.

  13. Leadership Development Program Final Project

    NASA Technical Reports Server (NTRS)

    Parrish, Teresa C.

    2016-01-01

    TOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.

  14. Naval Reactors Prime Contractor Team (NRPCT) Experiences and Considerations With Irradiation Test Performance in an International Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MH Lane

    2006-02-15

    This letter forwards a compilation of knowledge gained regarding international interactions and issues associated with Project Prometheus. The following topics are discussed herein: (1) Assessment of international fast reactor capability and availability; (2) Japanese fast reactor (JOYO) contracting strategy; (3) NRPCT/Program Office international contract follow; (4) Completion of the Japan Atomic Energy Agency (JAEA)/Pacific Northwest National Laboratory (PNNL) contract for manufacture of reactor test components; (5) US/Japanese Departmental interactions and required Treaties and Agreements; and (6) Non-technical details--interactions and considerations.

  15. Simulation test beds for the space station electrical power system

    NASA Technical Reports Server (NTRS)

    Sadler, Gerald G.

    1988-01-01

    NASA Lewis Research Center and its prime contractor are responsible for developing the electrical power system on the space station. The power system will be controlled by a network of distributed processors. Control software will be verified, validated, and tested in hardware and software test beds. Current plans for the software test bed involve using real time and nonreal time simulations of the power system. This paper will discuss the general simulation objectives and configurations, control architecture, interfaces between simulator and controls, types of tests, and facility configurations.

  16. Prime Contract Awards Alphabetically by Contractor, By State or Country, and Place, FY 84. Part 11. (Tucker & Associates Contg - Zytron Corporation).

    DTIC Science & Technology

    1984-01-01

    5 00 Wi tO 0 * *m~M 05- a * 0 0 0 D0N M 00 0 0 0 0 0 0 0 0 00 0 0 i0- 0 , 00 0 0 0 0 0 0 0 0 00 0 0 - ~ i -. 0 0 0 0 0 0Y 0 CD...ON WN WD CLe) 0 Wi - - - - )* C D- q n N7 n - 5 n r0 N) -- .- . - -- "T Iq "r

  17. Commercial application of thermal protection system technology

    NASA Technical Reports Server (NTRS)

    Dyer, Gordon L.

    1991-01-01

    The thermal protection system process technology is examined which is used in the manufacture of the External Tank for the Space Shuttle system and how that technology is applied by private business to create new products, new markets, and new American jobs. The term 'technology transfer' means different things to different people and has become one of the buzz words of the 1980s and 1990s. Herein, technology transfer is defined as a means of transferring technology developed by NASA's prime contractors to public and private sector industries.

  18. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY83, Part 1 (Adamsville, Alabama - Ferndale, Michigan).

    DTIC Science & Technology

    1983-01-01

    ALABAMA 281 281 WESTON ROY F ANNISTON ALABAMA 585- 585- WESTON ROY F & HARRINGTON ETAL JV ANNISTON ALABAMA 52 52 WILLIAMS CONSTRUCTION CO INC ANNISTON...ALABAMA 33 33 ERNEST CONSTRUCTION CO BAY MINETTE ALABAMA 200 200 SYNTEX DENTAL CO BAY MINETTE ALABAMA 2,601 169 2,412 2,925 91 189 2,445 200 QUALITY...ALABAMA 1,235 1,235 WILLIAMS BURT CONST & REMODELNG C FORT RUCKER ALABAMA 160 160 WOODHAM & SHARPE FORT RUCKER ALABAMA 44 44 XEROX CORP FORT RUCKER

  19. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E, Fiscal Year 1992

    DTIC Science & Technology

    1992-01-01

    201 F CANADIAN COMMERCIAL CORPORATI 268 B AMTEC CORPORATION 67 N CARNEGIE MELLON UNIVERSITY 118 B ANALYSIS & TECHNOLOGY INC 192 B CAS INC 86 N...LAB INC 342 F GENERAL ELECTRIC CO PLC THE 356 B DU PONT E I DE NEMOURS & CO 3 B GENERAL ELECTRIC COMPANY 325 N DUKE UNIVERSITY 295 N GENERAL HOSPITAL...F SOREQ NUCLEAR RESEARCH CENTER 260 F PORTON INTERNATIONAL INC 55 N SOUTH CAROLINA RESCH AUTHORITY 82 B PRC INC 206 N SOUrTHEASTN CTR ELECTR ENG ED

  20. Study to forecast and determine characteristics of world satellite communications market

    NASA Technical Reports Server (NTRS)

    Filep, R. T.; Schnapf, A.; Fordyce, S. W.

    1983-01-01

    The world commercial communications satellite market during the spring and summer of 1983 was examined and characteristics and forecasts of the market extending to the year 2000 were developed. Past, present and planned satellites were documented in relation to frequencies, procurement and launch dates, costs, transponders, and prime contractor. Characteristics of the market are outlined for the periods 1965 - 1985, 1986 - 1989, and 1990 - 2000. Market share forecasts, discussions of potential competitors in various world markets, and profiles of major communication satellite manufacturing and user countries are documented.

  1. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY83, Part 2 (Flint, Michigan - Wheatland, Wyoming).

    DTIC Science & Technology

    1983-01-01

    MARK AERIAL SURVEYS INC MINNEAPOLIS MINNESOTA 538 538 HYDRAULIC SPECIALTY CO MINNEAPOLIS MINNESOTA 36 3r INTRAN CORP MINNEAPOLIS MINNESOTA 171 171 J C...OITEv sOWES INC VICKSBURG mISS 25 25 PONTCHARTRAIN MATERIALS CORP VICKSURG mISS 543 543 OUCKETT MAH4INERY C VICKSBURG MISS 217 217 IACAL DECCA SURVEY ...ASSOCIATES FORT DIX NEW JERSEY 42 42 EC INC FORT DIX NEW JERSEY 28 28 EY SHAMPOOING CO FORT DIX NEW JERSEY 475 475 JERSEY BELL TELEPHONE CO FORT DIX

  2. Dollar Summary of Prime Contract Awards by State, County, Contractor, and Place, FY83, Part 2 (Oceana, Michigan - Weston, Wyoming).

    DTIC Science & Technology

    1983-01-01

    CATERING CO MINNEAPOLIS 35 35 MINNE HENNEPI HURD MARK AERIAL SURVEYS INC MINNEAPOLIS 538 538 MINNE HENNEPI HYDRAULIC SPECIALTY CO MINNEAPOLIS 36 36...539 539 PITNEY BOWES INC VICKSBURG 25 25 PONTCHARTRAIN MATERIALS CORP VICKSBURG 543 543 PUCKETT MACHINERY CO VICKSBURG 217 217 RACAL DECCA SURVEY INC...138 138 VIEC INC FORT DIX 28 28 rLEY SHAMPOOING CO FORT DIX 475 475 rOROLA INC MCGUIRE AFB 115 29 86 L TRANSFORMERS BORDENTOWN 368 368 9 JERSEY BELL

  3. Space Nuclear Power Plant Pre-Conceptual Design Report, For Information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    B. Levine

    2006-01-27

    This letter transmits, for information, the Project Prometheus Space Nuclear Power Plant (SNPP) Pre-Conceptual Design Report completed by the Naval Reactors Prime Contractor Team (NRPCT). This report documents the work pertaining to the Reactor Module, which includes integration of the space nuclear reactor with the reactor radiation shield, energy conversion, and instrumentation and control segments. This document also describes integration of the Reactor Module with the Heat Rejection segment, the Power Conditioning and Distribution subsystem (which comprise the SNPP), and the remainder of the Prometheus spaceship.

  4. 76 FR 32846 - Defense Federal Acquisition Regulation Supplement; Representation Relating to Compensation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-06

    ... written post-employment ethics opinion before receiving compensation from a contractor. It also applies to... procurement integrity for DoD. 3. DFARS 203.171-3 is an implementation of section 847 of the NDAA for FY 2008... receiving compensation from the contractor, the post- employment ethics opinion regarding post-employment...

  5. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  6. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  7. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  8. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  9. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  10. Benefit Evaluation of Implementing BIM in Construction Projects

    NASA Astrophysics Data System (ADS)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  11. ISS Logistics Hardware Disposition and Metrics Validation

    NASA Technical Reports Server (NTRS)

    Rogers, Toneka R.

    2010-01-01

    I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.

  12. Report on audit of Department of Energy`s contractor salary increase fund

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-04

    The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractormore » employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.« less

  13. Does Verb Bias Modulate Syntactic Priming?

    ERIC Educational Resources Information Center

    Bernolet, Sarah; Hartsuiker, Robert J.

    2010-01-01

    In a corpus analysis of spontaneous speech Jaeger and Snider (2007) found that the strength of structural priming is correlated with verb alternation bias. This finding is consistent with an implicit learning account of syntactic priming: because the implicit learning model implemented by Chang (2002), Chang, Dell, and Bock (2006), and Chang,…

  14. Phasic Affective Modulation of Semantic Priming

    ERIC Educational Resources Information Center

    Topolinski, Sascha; Deutsch, Roland

    2013-01-01

    The present research demonstrates that very brief variations in affect, being around 1 s in length and changing from trial to trial independently from semantic relatedness of primes and targets, modulate the amount of semantic priming. Implementing consonant and dissonant chords (Experiments 1 and 5), naturalistic sounds (Experiment 2), and visual…

  15. Radon gas: contractor liability for an indoor health hazard.

    PubMed

    Shuko, C M

    1986-01-01

    Many families throughout the United States have recently detected dangerously high concentrations of radon gas inside their homes. Radon, a carcinogenic gas produced from uranium, has been discovered in structures overlying uranium-bearing rock. This discovery may result in litigation to determine contractor liability for building upon radon-releasing rock sites. This Note examines the strengths and weaknesses of the various theories of contractor liability and considers potential statutory claims under the Clean Air Act. The Note suggests, as an alternative approach to recovery, a proposed regulatory scheme and implementation plan.

  16. Aerospace Safety Advisory Panel

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This report provides findings, conclusions and recommendations regarding the National Space Transportation System (NSTS), the Space Station Freedom Program (SSFP), aeronautical projects and other areas of NASA activities. The main focus of the Aerospace Safety Advisory Panel (ASAP) during 1988 has been monitoring and advising NASA and its contractors on the Space Transportation System (STS) recovery program. NASA efforts have restored the flight program with a much better management organization, safety and quality assurance organizations, and management communication system. The NASA National Space Transportation System (NSTS) organization in conjunction with its prime contractors should be encouraged to continue development and incorporation of appropriate design and operational improvements which will further reduce risk. The data from each Shuttle flight should be used to determine if affordable design and/or operational improvements could further increase safety. The review of Critical Items (CILs), Failure Mode Effects and Analyses (FMEAs) and Hazard Analyses (HAs) after the Challenger accident has given the program a massive data base with which to establish a formal program with prioritized changes.

  17. Review of the Constellation Level II Safety, Reliability, and Quality Assurance (SR&QA) Requirements Documents during Participation in the Constellation Level II SR&QA Forum

    NASA Technical Reports Server (NTRS)

    Cameron, Kenneth D.; Gentz, Steven J.; Beil, Robert J.; Minute, Stephen A.; Currie, Nancy J.; Scott, Steven S.; Thomas, Walter B., III; Smiles, Michael D.; Schafer, Charles F.; Null, Cynthia H.; hide

    2009-01-01

    At the request of the Exploration Systems Mission Directorate (ESMD) and the Constellation Program (CxP) Safety, Reliability; and Quality Assurance (SR&QA) Requirements Director, the NASA Engineering and Safety Center (NESC) participated in the Cx SR&QA Requirements forum. The Requirements Forum was held June 24-26; 2008, at GRC's Plum Brook Facility. The forums purpose was to gather all stakeholders into a focused meeting to help complete the process of refining the CxP to refine its Level II SR&QA requirements or defining project-specific requirements tailoring. Element prime contractors had raised specific questions about the wording and intent of many requirements in areas they felt were driving costs without adding commensurate value. NESC was asked to provide an independent and thorough review of requirements that contractors believed were driving Program costs, by active participation in the forum. This document contains information from the forum.

  18. 10 CFR 851.12 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENERGY WORKER SAFETY AND HEALTH PROGRAM Program Requirements § 851.12 Implementation. (a) Contractors... taking any additional protective action that is determined to be necessary to protect the safety and health of workers. ...

  19. Payload specialist station study. Volume 3: Program study cost estimates. Part 1: Work breakdown structure

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The work breakdown structure (WBS) for the Payload Specialist Station (PSS) is presented. The WBS is divided into two elements--PSS contractor and mission unique requirements. In accordance with the study ground rules, it is assumed that a single contractor, hereafter referred to as PSS Contractor will perform the following: (1) provide C and D hardware (MFDS and elements of MMSE), except for GFE; (2) identify software requirements; (3) provide GSE and ground test software; and (4) perform systems engineering and integration in support of the Aft Flight Deck (AFD) C and D concept. The PSS Contractor WBS element encompasses a core or standardized PSS concept. Payload peculiar C and D requirements identified by users will originate as a part of the WBS element mission unique requirements; these requirements will be provided to the PSS Contractor for implementation.

  20. Leader-follower function for autonomous military convoys

    NASA Astrophysics Data System (ADS)

    Vasseur, Laurent; Lecointe, Olivier; Dento, Jerome; Cherfaoui, Nourrdine; Marion, Vincent; Morillon, Joel G.

    2004-09-01

    The French Military Robotic Study Program (introduced in Aerosense 2003), sponsored by the French Defense Procurement Agency and managed by Thales Airborne Systems as the prime contractor, focuses on about 15 robotic themes which can provide an immediate "operational added value." The paper details the "robotic convoy" theme (named TEL1), which main purpose is to develop a robotic leader-follower function so that several unmanned vehicles can autonomously follow teleoperated, autonomous or on-board driven leader. Two modes have been implemented: Perceptive follower: each autonomous follower anticipates the trajectory of the vehicle in front of it, thanks to a dedicated perception equipment. This mode is mainly based on the use of perceptive data, without any communication link between leader and follower (to lower the cost of future mass development and extend the operational capabilities). Delayed follower: the leader records its path and transmits it to the follower; the follower is able to follow the recorded trajectory again at any delayed time. This mode uses localization data got from inertial measurements. The paper presents both modes with detailed algorithms and the results got from the military acceptance tests performed on wheeled 4x4 vehicles (DARDS French ATD).

  1. Micro-video display with ocular tracking and interactive voice control

    NASA Technical Reports Server (NTRS)

    Miller, James E.

    1993-01-01

    In certain space-restricted environments, many of the benefits resulting from computer technology have been foregone because of the size, weight, inconvenience, and lack of mobility associated with existing computer interface devices. Accordingly, an effort to develop a highly miniaturized and 'wearable' computer display and control interface device, referred to as the Sensory Integrated Data Interface (SIDI), is underway. The system incorporates a micro-video display that provides data display and ocular tracking on a lightweight headset. Software commands are implemented by conjunctive eye movement and voice commands of the operator. In this initial prototyping effort, various 'off-the-shelf' components have been integrated into a desktop computer and with a customized menu-tree software application to demonstrate feasibility and conceptual capabilities. When fully developed as a customized system, the interface device will allow mobile, 'hand-free' operation of portable computer equipment. It will thus allow integration of information technology applications into those restrictive environments, both military and industrial, that have not yet taken advantage of the computer revolution. This effort is Phase 1 of Small Business Innovative Research (SBIR) Topic number N90-331 sponsored by the Naval Undersea Warfare Center Division, Newport. The prime contractor is Foster-Miller, Inc. of Waltham, MA.

  2. A System That Works: Highlights of Effective Intervention Strategies in a Quality Improvement System

    ERIC Educational Resources Information Center

    Sinisterra, Diana; Baker, Stephen

    2010-01-01

    This paper describes one approach to quality improvement efforts: the Quality Improvement System (QIS) implemented by Prime Time Palm Beach County (Prime Time) in Palm Beach County, Florida. Prime Time's QIS is recognized as one promising systemic effort to improve quality in the afterschool field (Yohalem, Granger, & Pittman, 2009). As a…

  3. An Introduction to Project PRIME and CAMPUS MINNESOTA. Project PRIME Report, Number 2.

    ERIC Educational Resources Information Center

    Cordes, David C.

    PRIME is an acronym for Planning Resources in Minnesota Education. The project's primary objective is to test the implementation of CAMPUS (Comprehensive Analytical Methods for Planning University Systems) in one State College, one Junior College, and in one school at the University of Minnesota. The CAMPUS model was developed by the Institute for…

  4. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY 88. Part 15. (Ogilvie Electronics-Prime Engineering Co., Inc.)

    DTIC Science & Technology

    1988-01-01

    1 MON 𔃺 cr U. WU NN U& 0 > I- I’X O 𔃺 co w A - 00 C . CL 0 0 I= 0 II ON I 0f C14 w(N 0 ~ 0 ~ N 0D zN I-- 2 -C Z ICON " 00 1-1 I4ii~iiiN 00 00 0 CO...f, r- 000000 00 00 00 00 00 0AC- 00 00 00 < ICOC’ 1 000 00 000000 000000 00 00 00 00 00 L 00 0000 00 I COON I1"-> 1’COON 1 F- 0 .I 0. LA 4C ICON 4...00 0000c00 00 0000 000000 0000 00 0000 000000 00 00 39W0 ’oq 10 40WON00 9- ICON " I .4 CIWON I90 t MON 1 1- 0 0 0 0 F.-IWO 9oi I> Z - 2 (a(00Wt0)W oLl

  5. The NASA welding assessment program

    NASA Technical Reports Server (NTRS)

    Scott-Monck, J.; Bozek, J.

    1984-01-01

    The potential cost and performance advantages of welding was understood but ignored by solar panel manufacturers in the U.S. Although NASA, DOD and COMSAT have supported welding development efforts, soldering remains the only U.S. space qualified method for interconnecting solar cells. The reason is that no U.S. satellite prime contractor found it necessary, due to mission requirements, to abandon the space proven soldering process. It appears that the proposed NASA space station program will provide an array requirement, a 10 year operation in a low Earth orbital environment, that mandates welding. The status of welding technology in the U.S. is assessed.

  6. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 4, (Allenville, Missouri-Wyoming, Pennsylvania).

    DTIC Science & Technology

    1984-01-01

    HEATHER DRUG CO INC 182 182 HEATHER DRUG CO INC 50 50 HEATHER DRUG CO INC 81 81 HUSSMANN CORPORATION 76 76 INFORMATION SPECTRUM INC 519 319 74 INFORTRON...PISCATAWAY BEECHAM INC 151 151 BLOCK DRUG COMPANY INC 29 29 DIGITAL EQUIPMENT CORPORATION 692 692 HEWLETT PACKARD CO 206 206 INGERSOLL-RAND COMPANY INC 26...FOOD & DRUG RESEARCH LABS 131 131 VALLEY FORGE FLAG CO INC 1,504 1,504 TOTAL - VERONA 2,126 131 144 35 1,816 VINCENTOWN K I M CONSTRUCTION COMPANY INC

  7. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 2 (Air Force Academy, Colorado-Zion, Illinois).

    DTIC Science & Technology

    1984-01-01

    THEODORE AND COMPANY 32 32 HOLDING HAROLD R 71 71 INTERACTIVE SYSTEMS CORP 297 297 J & R CONSTRUCTION CO INC 94 94 KETCHUM KONKEL & AUSTIN 10 150 MC...TELECOM INC 510 510 DATA SYSTEMS MARKETING 26 26 DUGGAN PETROLEUM CO INC 3,249 3,249 HONEYWELL INC 3,581 267 2,400 830 INTERACTIVE SYSTEMS CORP 424 424...FORCE DLA OCE ODA SANDERSVILLE PRENTISS DRUG & CHEMICAL CO 89 89 TOTAL - SANDERSVILLE 744 744 SAVANNAH A C S CONSTRUCTION CO MISS 550 550 A J C INTL

  8. Orion EM-1 Booster Preps - Aft Skirt Preps/Painting

    NASA Image and Video Library

    2016-10-28

    A paint technician with Orbital ATK, prime contractor for the Space Launch System (SLS) Booster, uses an air gun to apply paint to the right hand aft skirt for NASA’s SLS rocket inside a support building at the Hangar AF facility at Cape Canaveral Air Force Station. The space shuttle-era aft skirt, was inspected and resurfaced to prepare it for primer and paint. The aft skirt will be used on the right hand booster of the SLS rocket for Exploration Mission 1 (EM-1). NASA is preparing for EM-1, deep-space missions, and the journey to Mars.

  9. X-ray satellite (ROSAT)

    NASA Technical Reports Server (NTRS)

    1986-01-01

    With regards to technical performance, the project is running according to plan. An increase in total cost outlay was required. The new Dornier Systems schedule projects ROSAT launch readiness for April 27, 1988. However, as a result of the Challenger accident, no binding launch date has been received from NASA. The thirteenth status review was conducted at the prime contractor in March, 1986. Assembly of the FM mirror system has been interrupted due to irregularities in the gold damping; in addition, mission operation and simulator development are effected by understaffing. Postponements have been announced in the data transmission and components acquisition subsystems.

  10. Microgravity

    NASA Image and Video Library

    2000-01-30

    Engineers from NASA's Glenn Research Center demonstrate the access to one of the experiment racks planned for the U.S. Destiny laboratory module on the International Space Station (ISS). This mockup has the full diameter, full corridor width, and half the length of the module. The mockup includes engineering mockups of the Fluids and Combustion Facility being developed by NASA's Glenn Research Center. (The full module will be six racks long; the mockup is three racks long). Listening at center is former astronaut Brewster Shaw (center), now a program official with the Boeing Co., the ISS prime contractor. Photo credit: NASA/Marshall Space Flight Center (MSFC)

  11. All Prime Contract Awards by State or Country, Place, and Contractor. Part 10 (Croom, Maryland-Mendon, Mass)

    DTIC Science & Technology

    1990-01-01

    A -IfCJ A ACI 11 LO n (O ? )-t ((D In ((D D-0- n InW ItJ0- W MJWW W .1 ..I<(-4 it I I 1-UCI 41) 0 (04 >1 :: o c" C c14 A CA ACCA C (,j AOCANAN" C CA C...7 )0470 C )) )4))M )( DD000 )0 )0 M0) 0) M0( F8 -00 0 0 8-481I8IM(0.4 it " 0) () r-000000000000000000000000000000000 00 0 ) ) -w I(0-4 it 1A

  12. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 5, (Ashton, Rhode Island-Sinclair, Wyoming).

    DTIC Science & Technology

    1984-01-01

    ASSOCIATES INC 37 37 WARD 79 LTD DEL 242 242 WEEKS CONSTRUCTION CO 66 66 WESTINGHOUSE ELECTRIC CORP 29 29 WILLIAMS SERVICES INC 629 629 XEROX CORPORATION...UNIVERSITY OF SOUTH CAROLINA 489 242 190 57 WILLIAMS SERVICES INC 56 56 XEROX CORPORATION 202 163 39 TOTAL - COLUMBIA 28,454 17,409 791 439 2,499 7,316...CO OF LAKE C 165 165 FENNELL CNTR CO CHRLSTN 148 148 FLAD & ASSOCIATES OF FLORIDA 26 26 FREEMAN WILLIAM F INC 48 48 GENERATION III INC 51 51

  13. Apollo Soyuz test project. USA-USSR, fact sheet

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The Apollo Soyuz Test Project (ASTP) is discussed. The United States and the Soviet Union have agreed to develop compatible rendezvous and docking systems which will provide a basis for docking and rescue on future spacecraft of both nations. The ASTP mission will include testing the rendezvous system in orbit, verifying techniques for transfer of astronauts and cosmonauts, and conducting experiments while docked and undocked. Diagrams of the spacecraft and systems involved in the tests are presented. The prime contractors for the equipment are identified. Biographical data on the astronauts participating in the program are provided.

  14. Starting A New Project: Thoughts from NGST

    NASA Technical Reports Server (NTRS)

    Mather, John C.; Oegerle, William (Technical Monitor)

    2002-01-01

    Some key elements of the history of NGST (Next Generation Space Telescope) that made a new mission possible will be reviewed, from the very beginnings to the present moment in the middle of selecting a prime contractor. A few forecasts of the possible discoveries will be made that may precede the launch of a new UV telescope, in hopes of inspiring sufficiently ambitious goals that they will still be exciting in 15 or 20 years. We will also discuss the enabling technology for NGST and my thoughts on enabling technology for a UV telescope Flint: they are not all about detectors and Mirrors!

  15. All Prime Contract Awards by State or Country, Place, and Contractor. Part 3 (Lomita, California-Sand Hill, California).

    DTIC Science & Technology

    1990-01-01

    I 000 MI ~CY) CCCC1)c ) C11 IP )ClOCOCO MC = 1) CO) ~ CYO ~ C’) ~CO =1 ) v C1 = (1 11 1(00 COO f rH -r -I ,r -I * 1 ’ -- - r- 4- r- 4- r- 4- 4- 4- 4...4 < M Cf) 11 0 0-40 0 1-1-40 -400 >-400COO4000 Uo -40 r 11 103M 11 0 t-400 zo 0)0 >-MOO -Moooooooo a 0)o < 11 1 MCI) 11 (71 1-- a* 0) _j 00) >. CIO

  16. 75 FR 22556 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... implement disenrollment from TRICARE Prime, TRICARE Prime Remote or the Uniformed Services Family Health... viewing on the Internet at http://www.regulations.gov as they are received without change, including any...

  17. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  18. Work Zone Design and Operations Enhancements

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  19. Work zone and operation enhancements.

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  20. Site support program plan for ICF Kaiser Hanford Company, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    This document is the general administrative plan implemented by the Hanford Site contractor, ICF Kaiser Hanford Company. It describes the mission, administrative structure, projected staffing, to be provided by the contractor. The report breaks out the work responsibilities within the different units of the company, a baseline schedule for the different groups, and a cost summary for the different operating units.

  1. Expert Meeting Report: HVAC Fault Detection, Diagnosis, and Repair/Replacement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Springer, David

    The concept for the expert meeting described in this report was to bring together most of the stakeholders in the area of FDD, including academic researchers, manufacturers, educators, program managers and implementers, representatives of standards organizations, utilities, HVAC contractors, and home performance contractors to identify the major gaps and to develop ideas about what can be done to capitalize on the residential HVAC efficiency resource.

  2. Expert Meeting Report: HVAC Fault Detection, DIagnosis, and Repair/Replacement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Springer, David

    The concept for the expert meeting described in this report was to bring together most of the stakeholders in the area of FDD, including academic researchers, manufacturers, educators, program managers and implementers, representatives of standards organizations, utilities, HVAC contractors, and home performance contractors to identify the major gaps and to develop ideas about what can be done to capitalize on the residential HVAC efficiency resource.

  3. Implementation Science for closing the treatment gap for mental disorders by translating evidence base into practice: experiences from the PRIME project.

    PubMed

    Shidhaye, Rahul

    2015-12-01

    This paper utilizes the experience of PRIME (Programme for Improving Mental health care) to exemplify how implementation science provides key insights and approaches to closing the treatment gap for mental disorders. The real-world application of strategies described in the implementation science literature, accompanied by use of alternative, rigorous evaluation methods to assess their impact on patient outcomes, can help in closing the mental health treatment gap in disadvantaged populations. © The Royal Australian and New Zealand College of Psychiatrists 2015.

  4. Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report

    NASA Technical Reports Server (NTRS)

    Dorman, Lane

    2015-01-01

    This Corrective Measures Implementation (CMI) Progress Report, Revision 1, for Contractor's Road Heavy Equipment (CRHE) Area Solid Waste Management Unit (SWMU) Number 055 was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B, Delivery Order NNK09CA62D and Project Number PCN ENV-2324. This CMI Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site.

  5. TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

    NASA Technical Reports Server (NTRS)

    Young, Roy M.; Montgomery, Edward E.; Montgomery, Sandy; Adams, Charles L.

    2007-01-01

    The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 separate, independent system design and development hardware demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L'Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter ground demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators. Descriptions of the system designs for both the ATK and L'Garde systems will be presented. Changes, additions and evolution of the system designs will be highlighted. A description of the modeling and analyses activities performed by both teams, as well as testing conducted to raise the TRL of solar sail technology will be presented. A summary of the results of model correlation activities will be presented. Finally, technology gaps identified during the assessment and gap closure plans will be presented, along with "lessons learned", subsequent planning activities and validation flight opportunities for solar sail propulsion technology.

  6. The BepiColombo Spacecraft: The Mercury Transfer Module Structure Qualification Test Campaign Description

    NASA Astrophysics Data System (ADS)

    Martin Zurdo, M. J.

    2012-07-01

    The BepiColombo is a space mission to Mercury (ESA in cooperation with Japan Aerospace Exploration Agency). The spacecraft consist of three different structures: two orbiters responsible for the scientific mission (MPO and MMO) and one service module, Mercury Transfer Module (MTM), which provides propulsion and services during the journey to Mercury. Taking into account only the MTM structure, the companies involved are ASTRIUM GERMANY acting as the prime contractor and ASTRIUM UK acting as the co- prime contractor company. EADS CASA Espacio (ECE) in Spain is the company responsible for the final design, manufacturing and qualification of the MTM structure. The test campaign specimen is the MTM core structure, which corresponds to the central cone with the structure floors, shear panels and tank support structure. This test campaign qualifies the primary load path and its primary interfaces; the rest of the MTM structure is qualified by system level vibration test. In order to qualify the MTM structure, three different kinds of qualification tests have been performed: stiffness test, global strength test and local tests in different specific areas. The most relevant test during the campaign is the global strength test case, in which several external loads are introduced (different interfaces) simulating the load introduction for a selected critical flight case. There are two important items in the qualification test campaign: 1. The instrumentation of the structure, with two main functions: to control the specimen under test loads, and to demonstrate the qualification of the structure. 2. The set-up structure, designed by ECE to allow the correct load introduction on each testing case during the whole test campaign. This paper describes the MTM structure test campaign from the definition of the loads applied in each test to the qualification of the complete structure.

  7. Work zone design and operation enhancements : final report, March 2010.

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  8. 48 CFR 52.212-5 - Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)). (2) 52.233-3, Protest After Award (AUG 1996...), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than... indicated below, the extent of the flow down shall be as required by the clause— (i) 52.203-13, Contractor...

  9. Prime Contractors with Awards Over $25,000 by Major System, Contractor and State. Part 2. AVJ Navy OV-10 Coin (Now Bronco) thru SMR Navy Swygert Shipyards, Inc.

    DTIC Science & Technology

    1991-01-01

    L. ..4L L.C11-- -4If’ I .d m a. ə -II 01-0 -. > Ln C. 00SI. . oIL W - 4 () I- I -.40." .- 4 - 4 a-4aa4WLa r 1W.4 Iu00T -4 -14 0-I VI - n- :a 4- - 0...01 &M10.00.0 = -.0-D- CD .I 0%. 0.CA (J U I 00 - s _ 4L W))0 to1) (nO U) OIL -MMUU)flml 0U)EU )- )Cto IA0 0 0) (/) I " ZOJ 00 0- 0 0 00 0 0 . 0 0 0 0...i Cl) 0. .j zo C) cc ~ 0 10C31 C) w w <- >. ix LaJOZ < V) 0 0 f 𔃺 C- I OiL 0 -1 (Xi 0 1. 1--1- - Lu 0.L m I I .iZ 0 L 0 (1 L 0 41 0 "- M~OO 0 01

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    No, author

    This report summarizes the outcome of U.S. Department of Energy (DOE) contract DE-OE0000543, requesting the design of a Cryptographic Key Management System (CKMS) for the secure management of cryptographic keys for the energy sector infrastructure. Prime contractor Sypris Electronics, in collaboration with Oak Ridge National Laboratories (ORNL), Electric Power Research Institute (EPRI), Valicore Technologies, and Purdue University's Center for Education and Research in Information Assurance and Security (CERIAS) and Smart Meter Integration Laboratory (SMIL), has designed, developed and evaluated the CKMS solution. We provide an overview of the project in Section 3, review the core contributions of all contractors inmore » Section 4, and discuss bene ts to the DOE in Section 5. In Section 6 we describe the technical construction of the CKMS solution, and review its key contributions in Section 6.9. Section 7 describes the evaluation and demonstration of the CKMS solution in different environments. We summarize the key project objectives in Section 8, list publications resulting from the project in Section 9, and conclude with a discussion on commercialization in Section 10 and future work in Section 11.« less

  11. 76 FR 70977 - Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... Intelligence. DSS functions and responsibilities include the administration and implementation of the Defense... will be handled and marked ``For Official Use Only.'' Affected Public: Businesses, universities... will promote the implementation of the NISP. Contractors operating under DoD security cognizance are...

  12. 43 CFR 417.1 - Scope of part.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER BASIN CONTRACTORS... methods for implementing Colorado River water conservation measures on Indian Reservations will be in... for the delivery of Colorado River water, and to Federal establishments other than Indian Reservations...

  13. 43 CFR 417.1 - Scope of part.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER BASIN CONTRACTORS... methods for implementing Colorado River water conservation measures on Indian Reservations will be in... for the delivery of Colorado River water, and to Federal establishments other than Indian Reservations...

  14. 43 CFR 417.1 - Scope of part.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER BASIN CONTRACTORS... methods for implementing Colorado River water conservation measures on Indian Reservations will be in... for the delivery of Colorado River water, and to Federal establishments other than Indian Reservations...

  15. 43 CFR 417.1 - Scope of part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER BASIN CONTRACTORS... methods for implementing Colorado River water conservation measures on Indian Reservations will be in... for the delivery of Colorado River water, and to Federal establishments other than Indian Reservations...

  16. Lessons learned : pavement marking warranty contract.

    DOT National Transportation Integrated Search

    2013-12-01

    In 2012, UDOT implemented a performance-based warranty on a portion of an I-15 pavement marking : project. The awarded contract requested a contractor warranty on the implemented markings for a total : duration of six years. This is the first time th...

  17. Phasic affective modulation of semantic priming.

    PubMed

    Topolinski, Sascha; Deutsch, Roland

    2013-03-01

    The present research demonstrates that very brief variations in affect, being around 1 s in length and changing from trial to trial independently from semantic relatedness of primes and targets, modulate the amount of semantic priming. Implementing consonant and dissonant chords (Experiments 1 and 5), naturalistic sounds (Experiment 2), and visual facial primes (Experiment 3) in an (in)direct semantic priming paradigm, as well as brief facial feedback in a summative priming paradigm (Experiment 4), yielded increased priming effects under brief positive compared to negative affect. Furthermore, this modulation took place on the level of semantic spreading rather than on strategic mechanisms (Experiment 5). Alternative explanations such as distraction, motivation, arousal, and cognitive tuning could be ruled out. This phasic affective modulation constitutes a mechanism overlooked thus far that may contaminate priming effects in all priming paradigms that involve affective stimuli. Furthermore, this mechanism provides a novel explanation for the observation that priming effects are usually larger for positive than for negative stimuli. Finally, it has important implications for linguistic research, by suggesting that association norms may be biased for affective words. (c) 2013 APA, all rights reserved.

  18. Development of LM10-MIRA LOX/LNG expander cycle demonstrator engine

    NASA Astrophysics Data System (ADS)

    Rudnykh, Mikhail; Carapellese, Stefano; Liuzzi, Daniele; Arione, Luigi; Caggiano, Giuseppe; Bellomi, Paolo; D'Aversa, Emanuela; Pellegrini, Rocco; Lobov, S. D.; Gurtovoy, A. A.; Rachuk, V. S.

    2016-09-01

    This article contains results of joint works by Konstruktorskoe Buro Khimavtomatiki (KBKhA, Russia) and AVIO Company (Italy) on creation of the LM10-MIRA liquid-propellant rocket demonstrator engine for the third stage of the upgraded "Vega" launcher.Scientific and research activities conducted by KBKhA and AVIO in 2007-2014 in the frame of the LYRA Program, funded by the Italian Space Agency, with ELV as Prime contractor, and under dedicated ASI-Roscosmos inter-agencies agreement, were aimed at development and testing of a 7.5 t thrust expander cycle demonstrator engine propelled by oxygen and liquid natural gas (further referred to as LNG).

  19. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, Fiscal Year 1987. Part 6. Donnegan Systems, Incorporated-Fairfield Machine Company, Incorporated.

    DTIC Science & Technology

    1987-01-01

    go- 0 00 0C0 C 00 000 00 0 10 CC I M .COCO Z- - - r-F P- -- rI , zt zt ,r - z - z - - I-- Zol I MOOC I,4-~- CON-00N <C 0-4 00- 4 00 <o C4-4-- 00040-4...InI 1 - In I- P. - --f- 1( ar - -r 1 P rf- -QvQv0vf- - - 0L I W I (AO MOOC Ll 70 CAC co V)00 0 n 0 0120000CO0 (10000 V) 00 0 (.12 00 0 0000

  20. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 19. (Tube Manufacturing Co., Inc.-Voith-Turbo GMBH & Co. KG)

    DTIC Science & Technology

    1989-01-01

    R RT PForm Approved OMB No. 0704-0188 PuOlic reporting ourden for this collection of information is estimated to average I hour per response... collection of information. Sena comments regarding this burden estimate or any other aspect of this collection of information, including suggestions...00 0 00Oc0 oc00000000c ODK IS1 aK N K L In K 01.0 11 K -e O 1 in0 qqI 4444444444444444444444444 * 0-4C’~i ) 0-4 C’) 0II II -4C Wr MI 00 00 00 00 0

  1. Navy Tactical Ocean Optical Products from the National Polar-orbiting Operational Environmental Satellite System (NPOESS)

    NASA Astrophysics Data System (ADS)

    Lyon, P. E.; Arnone, R.

    2006-12-01

    The Naval Research Laboratory at Stennis Space Center (NRLSSC) is preparing to produce optical products for Naval operations support from the National Polar-orbiting Operational Environmental Satellite System (NPOESS). This effort will leverage existing hardware and software systems in place at NRLSSC which are currently used to produce optical products from current sensors SeaWiFS and MODIS Aqua/Terra. This effort is part of an inter agency collaboration between NASA, NOAA, IPO, NRL and the prime contractor for NPOESS, Northrop Grumman / Raytheon. This poster presents an outline of the NRLSSC's plan for achieving the best possible optical products from NPOESS.

  2. KSC-2009-2311

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – The first Ares I-X motor segment is in the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  3. Assessment of Offshore Wind System Design, Safety, and Operation Standards

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sirnivas, Senu; Musial, Walt; Bailey, Bruce

    This report is a deliverable for a project sponsored by the U.S. Department of Energy (DOE) entitled National Offshore Wind Energy Resource and Design Data Campaign -- Analysis and Collaboration (contract number DE-EE0005372; prime contractor -- AWS Truepower). The project objective is to supplement, facilitate, and enhance ongoing multiagency efforts to develop an integrated national offshore wind energy data network. The results of this initiative are intended to 1) produce a comprehensive definition of relevant met-ocean resource assets and needs and design standards, and 2) provide a basis for recommendations for meeting offshore wind energy industry data and design certificationmore » requirements.« less

  4. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 14. (Nor Cal Aerospace-PHP Healthcare Corporation)

    DTIC Science & Technology

    1989-01-01

    01111101000004 0101001011014 01 01-00101010010101010 41 it Ic - If 000000000000001 00 00 00 0000000- 00 000000000m0000000000000 cell IWN- 11 0 0 11 1 004 If I...3 If 411 W .1II 100 I0 0.10 < II CIS 0 I ’C- ) el4 of 0.4 ca 0I oc i 0 000 N3U MM I.0U mWL.WA A0 _CL.I 0 (.) 0- "I 0I 4CJ"Ŕ , 4"C4(40 4 NCJ""N0 I l 1

  5. All Prime Contract Awards by State or Country, Place, and Contractor, FY 84. Part 3 (Acampo, California - Ozol, California).

    DTIC Science & Technology

    1984-01-01

    5 NL 0 I9 1I . 128 . 1.8 11125 .il N~l 6 MICROCOPY RESOLUTION TEST CHART NAMINAL RLIAtAU OF...8217Z I-- co 0 0D 0 - W r w. La - 5 IDC~ U) -U 0 C) If) - I) U 10ID I) ID 0 00C 000a0 00 0 (Os0 00 00 ( 0 0D 0 0 0 ( 0 0 ( . 0 -r, 0 0 0 C 00C 0 0 0 ... 0 ) LW F 0 1- O < 0 < 0 <OOF- L0 LU CD < 0

  6. Prime Contract Awards Over $25,000 by Major System, Contractor and State. Part 1. (AAA-BSG)

    DTIC Science & Technology

    1989-01-01

    estimated to average I hour per response. including the time for reviewng instructions searching existing data sources,gathering and maintaining the data ...JeffersonDavis highway. Suite 1204, Arlington, VA 22202,4302, and to the Office of Management and Budget. Paperwork Reduction Prolect (0704.018I), Washington, DC...IN W) MNMP l )C)C) ciMP l l1-I z cJ~ ICC cl IN C) 0(Du’)-. It) Nr.~- (DM In- - 141 I 4~~ t 06 0. E E I I CLcIcII T . I I UcI . u ) c ct)a 4)C ) wa

  7. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, Fiscal Year 1985. Part 3 (Bay Oil Company - Burns Lumber Co. Inc).

    DTIC Science & Technology

    1985-01-01

    FIELD GROUP SUB-GROUP 18...OOOO OOOO OOOO OOOO cocomm 00 OOOO 00 U i CO CO CO OOOO 17) 131 (3) O) <<<< o Q _J X IV) LU r> _J CO 4 H OtOCOCOCDCOtDCOCOCOCO...v^^;ov%-,:vSS:>:-:-^ !" • »\\- WVA""* ».* ’.* I • •••" M’^,𔃻 ’• Mill i.’Vm’ ’.I •M»».< ’," »WP.W » »n » n ».•• ^mmii^i I ..... ^ ... .^ rm £, .

  8. Nuclear Physics Made Very, Very Easy

    NASA Technical Reports Server (NTRS)

    Hanlen, D. F.; Morse, W. J.

    1968-01-01

    The fundamental approach to nuclear physics was prepared to introduce basic reactor principles to various groups of non-nuclear technical personnel associated with NERVA Test Operations. NERVA Test Operations functions as the field test group for the Nuclear Rocket Engine Program. Nuclear Engine for Rocket Vehicle Application (NERVA) program is the combined efforts of Aerojet-General Corporation as prime contractor, and Westinghouse Astronuclear Laboratory as the major subcontractor, for the assembly and testing of nuclear rocket engines. Development of the NERVA Program is under the direction of the Space Nuclear Propulsion Office, a joint agency of the U.S. Atomic Energy Commission and the National Aeronautics and Space Administration.

  9. KSC-2012-5809

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Bob Cabana, director of the Kennedy Space Center in Florida, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  10. KSC-2012-5806

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Bruce Deardoff, Canaveral Port Authority Commission chairman, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  11. KSC-2012-5810

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Bob Cabana, director of the Kennedy Space Center in Florida, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  12. KSC-2012-5812

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – David Radzanowski, NASA chief of staff, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  13. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1977.

    DTIC Science & Technology

    1977-01-01

    ENGINEERING INC * 2 e GENERAL i:tT~ LU l4 e DEWEEY ELECI-ONICS CORP It 160 E GENERAL I % 5TkUM E’t: 61.mP 9 43 DIGITAL CCt.MUNICATIONS C3O* 49 8...NORTHROP CORP • 63 h RANE CORP -- , 424 N NORTHWESTERN UNIVERSITY 4 .27 E RAYCLPN INOUSTKIES INC 383 8 OCEAN DATA SYSTEMS INC • 481 8 RAYPhNO ENGINEERING ...CONTROL INC . 344 h VIRGLNIA UNIVEkSITY (.;F 268 a SYSTEMS ENGINE -ING LAdORATONIES * 366 e VISIDYNE INC 26? 8 SYSTEMS EXPLOQATICN INC * 62 e VOUGHT CORP

  14. Fully Integral, Flexible Composite Driveshaft

    NASA Technical Reports Server (NTRS)

    Lawrie, Duncan

    2014-01-01

    An all-composite driveshaft incorporating integral flexible diaphragms was developed for prime contractor testing. This new approach makes obsolete the split lines required to attach metallic flex elements and either metallic or composite spacing tubes in current solutions. Subcritical driveshaft weights can be achieved that are half that of incumbent technology for typical rotary wing shaft lengths. Spacing tubes compose an integral part of the initial tooling but remain part of the finished shaft and control natural frequencies and torsional stability. A concurrently engineered manufacturing process and design for performance competes with incumbent solutions at significantly lower weight and with the probability of improved damage tolerance and fatigue life.

  15. Quality assurance and control in the production and static tests of the solid rocket boosters for the Space Shuttle

    NASA Technical Reports Server (NTRS)

    Cerny, O. F.

    1979-01-01

    The paper surveys the various aspects of design and overhaul of the solid rocket boosters. It is noted that quality control is an integral part of the design specifications. Attention is given to the production process which is optimized towards highest quality. Also discussed is the role of the DCA (Defense Contract Administration) in inspecting the products of subcontractors, noting that the USAF performs this role for prime contractors. Fabrication and construction of the booster is detailed with attention given to the lining of the booster cylinder and the mixing of the propellant and the subsequent X-ray inspection.

  16. Examining Adoption of e-Procurement in Public Sector Using the Perceived Characteristics of Innovating: Indonesian Perspective

    NASA Astrophysics Data System (ADS)

    Wahid, Fathul

    This study aims to examine factors affecting adoption of e-procurement in public sector with special reference to Indonesian context. The Perceived Characteristics of Innovating defined by Moore and Benbasat [1] used as the framework. Based on a survey to 87 contractors/suppliers in the city of Yogyakarta, the study finds that only trialability that affects use intention of e-procurement among the contractors/suppliers. The survey conducted in the early stage of e-procurement implementation is of the possible explanations. Government policy that forces the contractors/suppliers to use the e-procurement also partakes in this context. Practical implication of the findings are also discussed in the paper.

  17. CASIS Fact Sheet: Hardware and Facilities

    NASA Technical Reports Server (NTRS)

    Solomon, Michael R.; Romero, Vergel

    2016-01-01

    Vencore is a proven information solutions, engineering, and analytics company that helps our customers solve their most complex challenges. For more than 40 years, we have designed, developed and delivered mission-critical solutions as our customers' trusted partner. The Engineering Services Contract, or ESC, provides engineering and design services to the NASA organizations engaged in development of new technologies at the Kennedy Space Center. Vencore is the ESC prime contractor, with teammates that include Stinger Ghaffarian Technologies, Sierra Lobo, Nelson Engineering, EASi, and Craig Technologies. The Vencore team designs and develops systems and equipment to be used for the processing of space launch vehicles, spacecraft, and payloads. We perform flight systems engineering for spaceflight hardware and software; develop technologies that serve NASA's mission requirements and operations needs for the future. Our Flight Payload Support (FPS) team at Kennedy Space Center (KSC) provides engineering, development, and certification services as well as payload integration and management services to NASA and commercial customers. Our main objective is to assist principal investigators (PIs) integrate their science experiments into payload hardware for research aboard the International Space Station (ISS), commercial spacecraft, suborbital vehicles, parabolic flight aircrafts, and ground-based studies. Vencore's FPS team is AS9100 certified and a recognized implementation partner for the Center for Advancement of Science in Space (CASIS

  18. Johnston Atoll Plutonium Contaminated Soil Cleanup Project. 5th quarterly report, 1 August 94 to 31 October 1994. Technical report, 1 August-31 October 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Doane, R.W.; Grant, R.H.

    1996-09-01

    Thermo NUtech is the prime contractor for the Defense Nuclear Agency (DNA), responsible for the operation and maintenance of the Johnston Atoll plutonium Contaminated Soil Cleanup Project. During this production period, the Scope of Work included movement of soil to and from the plant, processing contaminated soil through the Segmented Gate System (SGS) and Soil Washing System, packaging of waste soil for shipment, identification and implementation of process improvements, data collection and validation, and compliance with all applicable regulations governing environmental safety and health. The SGS utilizes arrays of sensitive radiation detectors coupled with sophisticated computer software to segregate contaminatedmore » soil from a moving feed supply on conveyor belts. Contaminated soil is diverted to a `hot path` for plutonium particles greater than 5000 Becquerels or to a supplemental soil washing process designed to remove dispersed low leve%l contamination from a soil faction consisting of very small particles. Low to intermediate levels of contamination are removed from the soil to meet DNA`s criteria for unrestricted use of less than 500 Becquerels per kilogram of soil, with no hot particles. The low level concentrate is expected to be packaged for shipment to an approved defense waste disposal site.« less

  19. Constrained navigation for unmanned systems

    NASA Astrophysics Data System (ADS)

    Vasseur, Laurent; Gosset, Philippe; Carpentier, Luc; Marion, Vincent; Morillon, Joel G.; Ropars, Patrice

    2005-05-01

    The French Military Robotic Study Program (introduced in Aerosense 2003), sponsored by the French Defense Procurement Agency and managed by Thales as the prime contractor, focuses on about 15 robotic themes which can provide an immediate "operational add-on value". The paper details the "constrained navigation" study (named TEL2), which main goal is to identify and test a well-balanced task sharing between man and machine to accomplish a robotic task that cannot be performed autonomously at the moment because of technological limitations. The chosen function is "obstacle avoidance" on rough ground and quite high speed (40 km/h). State of the art algorithms have been implemented to perform autonomous obstacle avoidance and following of forest borders, using scanner laser sensor and standard localization functions. Such an "obstacle avoidance" function works well most of the time, BUT fails sometimes. The study analyzed how the remote operator can manage such failures so that the system remains fully operationally reliable; he can act according to two ways: a) finely adjust the vehicle current heading; b) take the control of the vehicle "on the fly" (without stopping) and bring it back to autonomous behavior when motion is secured again. The paper also presents the results got from the military acceptance tests performed on French 4x4 DARDS ATD.

  20. Contracting for Asbestos Abatement: What You Need to Know.

    ERIC Educational Resources Information Center

    Bittle, Edgar H.; McAllister, Jane B.

    1990-01-01

    School districts are required to determine if asbestos-containing materials exist at school facilities and design and implement asbestos abatement. Reviews how to select a contractor, draft the contract, and ensure its proper implementation by complying with the law and avoiding liability. (MLF)

  1. 40 CFR 52.2352 - Change to approved plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) rule R307-1-8, Asbestos Work Practices, Contractor Certification, AHERA Accreditation and AHERA Implementation, is removed from Utah's approved State Implementation Plan (SIP). This rule language pertains to... plan. (a) Utah Air Conservation Regulation R307-18-1, New Source Performance Standards, is removed from...

  2. Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to managemore » and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.« less

  3. Critical factors of implementing Industrialised Building System in Sarawak: A research on SMEs

    NASA Astrophysics Data System (ADS)

    Hadi, N. A.; Muhamad, W. M. N. W.; Othman, M. K. F.

    2017-05-01

    Industrialised Building System (IBS) have been adopted in Malaysia for over five decades and is expected to grow consistent with Malaysia's economic development. In promoting the adoption of IBS in construction projects, the government has taken several steps such as levy exemption for contractors and developers. Despite its numerous advantages and efforts pulled by the government, the implementation and adoption of IBS are still below the expected figure. Many researchers investigated readiness, setbacks and issues related to the implementation of IBS in Malaysia's construction projects. However, most of the research mainly for projects located in urban areas of West Malaysia. Therefore, this paper aims to close the gap on factors affecting the implementation of IBS for SMEs in Sarawak, where the level urbanisation is low. A semi-structured interview was conducted with 10 SME's contractors to get better insight view. The study found that logistics and infrastructure problems, a limited number of the manufacturer, lack of incentive, conventional payment methods, lack of financial supports are among critical factors affecting the implementation of IBS. Therefore, it was concluded that government plays major role in providing supports, incentives and facilitating the improvement of infrastructure to successfully implementing IBS in Sarawak.

  4. 14 CFR 120.1 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM... part 135 of this chapter, all air traffic control facilities not operated by the FAA or by or under... implement a drug and alcohol testing program under this part. (d) All contractors who elect to implement a...

  5. 14 CFR 120.1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM... part 135 of this chapter, all air traffic control facilities not operated by the FAA or by or under... implement a drug and alcohol testing program under this part. (d) All contractors who elect to implement a...

  6. Thoughts on Earned Value Assessments

    NASA Technical Reports Server (NTRS)

    Pido, Kelle

    2009-01-01

    This slide presentation reviews the concepts of Earned Value reporting and Earned Value Metrics (EVM) and the implementation for the Constellation Program. EVM is used to manage both the contract and civil service workforce, and used as a measure of contractor costs and performance. The Program EVM is not as useful for Level of Effort tasking, for either contractor, or civil service employees. Some issues and concerns in reference to EVM and the process for the use of EVM for Mission assurance are reviewed,

  7. Hanford Internal Dosimetry Program Manual, PNL-MA-552

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carbaugh, Eugene H.; Bihl, Donald E.; Maclellan, Jay A.

    2009-09-24

    This manual is a guide to the services provided by the Hanford Internal Dosimetry Program (IDP), which is operated by the Pacific Northwest National Laboratory.( ) for the U.S. Department of Energy Richland Operations Office, Office of River Protection and their Hanford Site contractors. The manual describes the roles of and relationships between the IDP and the radiation protection programs of the Hanford Site contractors. Recommendations and guidance are also provided for consideration in implementing bioassay monitoring and internal dosimetry elements of radiation protection programs.

  8. $$\\mu / \\pi$$ Separation using Convolutional Neural Networks for the MicroBooNE Charged Current Inclusive Cross Section Measurement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Esquivel, Jessica Nicole

    The purpose of this thesis was to use Convolutional Neural Networks (CNN) to separatemore » $$\\mu^{\\prime}$$s and $$\\pi^{\\prime}$$s for use in increasing the acceptance rate of $$\\mu^{\\prime}$$s below the implemented 75cm track length cut in the Charged Current Inclusive (CC-Inclusive) event selection for the CC-Inclusive Cross-Section Measurement. In doing this, we increase acceptance rate for CC-Inclusive events below a specific momentum range.« less

  9. The Saturn management concept

    NASA Technical Reports Server (NTRS)

    Bilstein, R. E.

    1974-01-01

    Management of the Saturn launch vehicles was an evolutionary process, requiring constant interaction between NASA Headquarters, the Marshall Space Flight Center (particularly the Saturn 5 Program Office), and the various prime contractors. Successful Saturn management was a blend of the decades of experience of the von Braun team, management concepts from the Army, Navy, Air Force, and Government, and private industry. The Saturn 5 Program Office shared a unique relationship with the Apollo Program Office at NASA Headquarters. Much of the success of the Saturn 5 Program Office was based on its painstaking attention to detail, emphasis on individual responsibilities (backed up by comprehensive program element plans and management matrices), and a high degree of visibility as embodied in the Program Control Center.

  10. All Prime Contract Awards by State or Country, and Contractor. Part 7. (Adel Georgia - La Grange Illinois)

    DTIC Science & Technology

    1990-01-01

    Ien’) I C)(o0)N00.-40oC’) 0 -iN4 C’ ) In .-4 00 T’ 0000 11I 1 IeC )- Ir Oi404-i" N - C’) 0> N 00 1i Iec (, it 0 -4 N CN ) In t0) 00I,_ ON)l 0 -4 Tr(0 vt...N 2N Z* 0-4 ZN c" D-4 U) 11. o zo 61010 - C> 0000 .40 cno000 ILOC 1-40 (00 40 00, LL M( -.1 ck -4 W-1U0-11 I KL) .000 4ɘ -000 20 0 0) -to co0 ZNC 1

  11. Prime Contract Awards by State or Country, Place and Contractor. Part 3 (Lodi, California - Saint Helena, California), FY1991

    DTIC Science & Technology

    1991-01-01

    ea0-4 Nm z (022 222(D Z1) ( ULL. .L L. WO LL A-l.. c2Zz U’) >2z ə 0 itUN o l 0) r- 0 0o 0D 00 -4 N" IX of < ) Nf Ijww - -. 1 c") 00 -4-4 -4 -4 11 1...on v ~ (()C) n =C’) 0D K1 = 0(0 xI ZO 00 00 0000 00 0000 0000 X0000 moo Zoo M000000 ZODOOOOOO Zoo 0) K 0 I t 0(D < I to ) in inCI)11UUI) ini SALE )n ni

  12. 1st Stage Separation Aerodynamics Of VEGA Launcher

    NASA Astrophysics Data System (ADS)

    Genito, M.; Paglia, F.; Mogavero, A.; Barbagallo, D.

    2011-05-01

    VEGA is an European launch vehicle under development by the Prime Contractor ELV S.p.A. in the frame of an ESA contract. It is constituted by four stages, dedicated to the scientific/commercial market of small satellites (300 ÷ 2500 kg) into Low Earth Orbits, with inclinations ranging from 5.2° up to Sun Synchronous Orbits and with altitude ranging from 300 to 1500 km. Aim of this paper is to present a study of flow field due to retro-rockets impingement during the 1st stage VEGA separation phase. In particular the main goal of the present work is to present the aerodynamic activities performed for the justification of the separation phase.

  13. JWST Full-Scale Model on Display in Germany

    NASA Image and Video Library

    2010-03-10

    JWST Full-Scale Model on Display. A full-scale model of the James Webb Space Telescope was built by the prime contractor, Northrop Grumman, to provide a better understanding of the size, scale and complexity of this satellite. The model is constructed mainly of aluminum and steel, weighs 12,000 lb., and is approximately 80 feet long, 40 feet wide and 40 feet tall. The model requires 2 trucks to ship it and assembly takes a crew of 12 approximately four days. This model has travelled to a few sites since 2005. The photographs below were taken at some of its destinations. The model is pictured here in Munich, Germany Credit: EADS Astrium

  14. JWST Full-Scale Model on Display in Germany

    NASA Image and Video Library

    2017-12-08

    JWST Full-Scale Model on Display. A full-scale model of the James Webb Space Telescope was built by the prime contractor, Northrop Grumman, to provide a better understanding of the size, scale and complexity of this satellite. The model is constructed mainly of aluminum and steel, weighs 12,000 lb., and is approximately 80 feet long, 40 feet wide and 40 feet tall. The model requires 2 trucks to ship it and assembly takes a crew of 12 approximately four days. This model has travelled to a few sites since 2005. The photographs below were taken at some of its destinations. The model is pictured here in Munich, Germany Credit: EADS Astrium

  15. All Prime Contract Awards by State or Country, Place, and Contractor. Part 4 (San Diego, California-Victorville, California)

    DTIC Science & Technology

    1990-01-01

    4 N 41, <- ɘ) 41 - <-40 MI C-4 04 N NNNNN04N N\\CN 0 40 40 -4 ’-4 0) 0 00C Oi MC-4 Ilr-4--44l"I4.4- -1.44 -f-4 1- 0 Coco c)0 41 W C oc NOWO H1-1 W...zoo4 Cn-44.-44-4- 0)0000o00000000 =1310- it I CI t 347 ) 00 NC- o 7 f40 -100 00(0) 2 1((( (0(0 a)0 _ NO) 0 OOOOOOOOO))C)0)0)C M 14 04 1-0 1- < 0 CA: 0Z

  16. KSC-07pd3622

    NASA Image and Video Library

    2007-12-12

    WASHINGTON, D.C. -- (From left) Brewster Shaw, vice president and genral manager of Boeing Space Exploration; Jeff Hanley, Constellation Program manager; Danny Davis, Upper Stage Element manager; Steve Cook, Ares Project manager; Doug Cooke, deputy associate administrator for Exploration Systems; and Rick Gilbrech, associate administrator for Space Exploration, stand with a model of the Ares I rocket on Dec. 12, 2007, at NASA Headquarters in Washington. NASA has selected The Boeing Company of Huntsville, Ala., as the prime contractor to produce, deliver and install avionics systsems for the Ares I rocket that will launch the Orion crew exploration vehicle into orbit. The selection is the final major contract award for Ares I. Photo credit: NASA/Paul E. Alers

  17. Aerospace Safety Advisory Panel

    NASA Technical Reports Server (NTRS)

    1984-01-01

    An assessment of NASA's safety performance for 1983 affirms that NASA Headquarters and Center management teams continue to hold the safety of manned flight to be their prime concern, and that essential effort and resources are allocated for maintaining safety in all of the development and operational programs. Those conclusions most worthy of NASA management concentration are given along with recommendations for action concerning; product quality and utility; space shuttle main engine; landing gear; logistics and management; orbiter structural loads, landing speed, and pitch control; the shuttle processing contractor; and the safety of flight operations. It appears that much needs to be done before the Space Transportation System can achieve the reliability necessary for safe, high rate, low cost operations.

  18. KSC-2009-2320

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, technicians check the fit of the end cover on the Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  19. KSC-2009-2321

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the open end of the Ares I-X motor segment is seen without the end cover. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  20. KSC-2009-2319

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, a technician begins propellant grain inspection of the interior of the Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  1. KSC-2009-2316

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the Ares I-X motor segment waits for inspection after removal of the shipping container. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  2. KSC-2009-2322

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, a technician performs propellant grain inspection of the inside of the Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  3. KSC-2009-2314

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the rail car cover is moved away from the first Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  4. KSC-2009-2315

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the Ares I-X motor segment is revealed after removal of the rail car cover. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  5. KSC-2009-2313

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the rail car cover is removed from the first Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  6. KSC-2009-2312

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the rail car cover is removed from the first Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  7. All Prime Contract Awards by State or Country, Place, and Contractor, FY 85. Part 5 (Arapahoe, Colorado - Washington, D.C.).

    DTIC Science & Technology

    1985-01-01

    444444. < MW 0 U 0. U <- OU cI- 0 < :412 8-4 M" I= Ul N >9 ? -4 cc0 a* N - 00 W(0 w.1 co. o U jNNc)InD9- i901I 00 0-4 <-4 Ufl." 20 > -4 ado 30 CI0 1... Porno .....) 4 : W&P 040( 0-I4 4004444 44040000004-44-40.44.44.44-44.44.--4-4.4.4-4.-44-4-4.40.44- I.- do I I a -’ ~ ~ N I , ICPN -440flOo r ntOO40 0-N

  8. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY 88. Part 11. (International Corporation-La Ronda)

    DTIC Science & Technology

    1988-01-01

    0 0 cau ( 5 . 4A 0 . d) - W 0 4Ao 0 C00 C -4 43 CL ..4 430 o m 0 ... 0 - CL- W 4 3 U 0 0c- 0 CI 0 -4 m. 43. 03 4 5 . 0 00 ’. C 43 S -4 Sn aW ’- 4 0 4 . 0 < _4 0 4w E E -4 - 06 M4 mW cc 5 . 0 4W .o . 0 2~. ~ c .= 0 >1 0 E3 2... 0 0 003 N, *- to C) 0 N4 U 4 -% -m U 0 -4 .-.4 3 C 4 -40 0

  9. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1978.

    DTIC Science & Technology

    1978-01-01

    HEIGHT MASS FtA NEWTON MASS 317 I?r INDUSTRIAL ELECTRIC MOTORS INC S 9A0 9 WEST ALLIS WISCONSIN 960 3068 AFRODYNE RESEARCH INC s 1.07? W BEDFORD MASS...9,838 WATERTON COLORADO 1,766 PITTSFIELO MASS Z6.627 ORLANDO FLORIDA IT1,678 WEST LYNN MASS 18s.04b BALTIMORE MARYLAND 379 WILMINGTON MASS $69 IN...NEEDHAM MASS 11,.57 STRATFORD CONN 5q ,5A Q NEEDHAM HEIGHT MASS 4.0, 64f WINDSOR LOCKS rONN I.A62 WHITE SANDS MS NEW MEXICO 83 WEST PALM SFAC FLORIDA bR

  10. An Overview of the James Webb Space Telescope (JWST) Project

    NASA Technical Reports Server (NTRS)

    Sabelhaus, Phillip A.

    2004-01-01

    The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the recent selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

  11. An Overview of the James Webb Space Telescope (JWST) Project

    NASA Technical Reports Server (NTRS)

    Sabelhaus, Phillip A.; Campbell, Doug; Clampin, Mark; Decker, John; Greenhouse, Matt; Johns, Alan; Menzel, Mike; Smith, Robert; Sullivan, Pam

    2005-01-01

    The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

  12. All Prime Contract Awards by State or Country, Place and Contractor. Part 4. (San Buenaventura, California-Ventura, California)

    DTIC Science & Technology

    1989-01-01

    40 .4M %-4- -4h Ch4 InN0NN N .- 4 .W 00-o4< -s~ ti4N 40 N -,4- -.4.4"N -f 4000000a -4N -4 -- 4N < I 1 Go4N 61 U0000 (AN *0)d 40 40- IRSN ...4NCI -4 4-4I.I -40 -4-I4 -I-I .- 4-4-4 -1-4 4.4 -NN II K M -40,4 K n $13 IN 00>->-)-* fie IV> 4 La f4>)-* PON IRSN mu(00* IGO. KEIO-4o oz2 02 0222Z

  13. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY 85. Part 21 (Video Animation Systems Inc - Zytron Corporation).

    DTIC Science & Technology

    1985-01-01

    22202-4302 ; a NAM E 0- FUND’NG ’SPONSORING Bb OFFICE SYMBOL 9 PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER7 0 RGAN IZ A nON (if applicable) ’, fy Stare...CODES 18. SUBJECT TERMS (Continue on reverse if necessary and identify by block number) rIELD GROUP SUB-GROUP 9 ABSTRACT (Continue on reverse if necessary...used untl exhausted. SECURITY CLASSIFICATION OF THIS PAGE 86 3 18 135 ’- . * -’ -" LLJi -- <ZO z. I.D K Z. %.) v 0w 0- a La Z. L.-J. _ju j V) 9 , 1. caZ0 0

  14. Dollar Summary of Prime Contract Awards by State, County, Contractor and Place. Part 3 (Midland-Monroe)

    DTIC Science & Technology

    1990-01-01

    O O OM J M-J in I - 00 .4 20 W N V 6444 0 600 . 00IOU I 40 M 4cI us I WL.ICIIn0 4 M4 z I I > -0 > MIDI AD M1 1-00 0 - 0 - to0000 300 0-1 0 IW WWwo-0...C W 0 I.-. a01 " 0 Z OJO w 01- I.- &Z 4% 3% wav Ww" Z" Wl.M% W% Ř CA 0 cc .4 1. w 1. -L- W -F = -Z " " W I-~ft- Z" 0 44 2o oo o 0: a-& a-la .40amoa

  15. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 15. (Phraxos Research and Dev.-Robert E. Compton DDS)

    DTIC Science & Technology

    1989-01-01

    34* at N Ce. j C, w-jCj " L- 00 (D ( WN(N* a " -4- 4II0I(-4NIILLI >* w >* w j* Ua >>* at M ( IL( (D WAV )A V) a)N = 1, IiEI(0-40 liOZ2ZZz CZZ OZZ 022 02...4 -4N L-4N Cj-4 (D -4 l3. - : MOM : I1(D(D 0( N a)~ CD to44444 0-4-4-4 to-4 (a MIDI c0 40 000( MO CO -1 >N 04 C)C’’ .ULL)Ln InU WJ 11 1 ((0 11 W00

  16. KSC-2012-5808

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Col. Rory Welch, vice commander for the 45th Space Wing at Patrick Air Force Base, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  17. KSC-2012-5805

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Greg Weiner, senior director of Business Development for the Economic Development Commission of Florida’s Space Coast, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  18. KSC-2012-5811

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Glenn Delgado, NASA associate administrator for the Office of Small Business Programs, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  19. KSC-2012-5807

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Larry Third, NASA small business specialist at the Kennedy Space Center in Florida, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  20. KSC-2012-5804

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Larry Third, NASA small business specialist at the Kennedy Space Center in Florida, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  1. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, Fiscal Year 1985. Part 10 (Hi Plains Supply - International Cnslt Eng Inc).

    DTIC Science & Technology

    1985-01-01

    cccC’-4.4 J-4-4 0,30----44.4f. w I(0 .41 -0)0000000 (00000 0)0 0)0)00000000 0ɘ (0(0c, f6 (0 .4ICCCCC ACC 1 ococo w w Wc co 0 000 000 n o00000 0 o...W00O00000000 woo0 INNC 1(0 .41200000000 200000 zoo 200000000000 2000 2WW F.- Im "W ww ww 11C(UCAAAA -4U)nCh cnAA(A 0-4IACA C ACCA ACCWj IC(nC (n -4<< o󈧎

  2. GBI assessment checklist: Level of awareness of the contractors in the Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Marhani, M. A.; Muksain, M. A. S.

    2018-02-01

    Malaysia has developed Green Building Index (GBI) as the green rating tool for buildings and townships to encourage sustainability in the construction industry. Understanding the roles and tasks of a contractor is essential in accomplishing the GBI assessment on a green building project. However, there are challenges in adapting the GBI. The objective of this paper is to identify the knowledge of contractor for each area of assessments in GBI’s checklist. Data were collected through the questionnaire surveys to the selected contractors, which were involved in GBI projects. The findings revealed that most of the respondents agreed and acknowledged the impact of each criterion in the assessment. Thus, it is highly recommended to educate and change the public perception on the awareness of the green building. Aside, more research and development (R&D) process should be encouraged to accelerate the GBI certificate implementation in the construction industry. In conclusion, proper education training, more legislative and financial framework are essential for the future of green building projects.

  3. The Shuttle processing contractors (SPC) reliability program at the Kennedy Space Center - The real world

    NASA Astrophysics Data System (ADS)

    McCrea, Terry

    The Shuttle Processing Contract (SPC) workforce consists of Lockheed Space Operations Co. as prime contractor, with Grumman, Thiokol Corporation, and Johnson Controls World Services as subcontractors. During the design phase, reliability engineering is instrumental in influencing the development of systems that meet the Shuttle fail-safe program requirements. Reliability engineers accomplish this objective by performing FMEA (failure modes and effects analysis) to identify potential single failure points. When technology, time, or resources do not permit a redesign to eliminate a single failure point, the single failure point information is formatted into a change request and presented to senior management of SPC and NASA for risk acceptance. In parallel with the FMEA, safety engineering conducts a hazard analysis to assure that potential hazards to personnel are assessed. The combined effort (FMEA and hazard analysis) is published as a system assurance analysis. Special ground rules and techniques are developed to perform and present the analysis. The reliability program at KSC is vigorously pursued, and has been extremely successful. The ground support equipment and facilities used to launch and land the Space Shuttle maintain an excellent reliability record.

  4. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 8. (General Contractor, Inc.-H and H Industrial Instruments)

    DTIC Science & Technology

    1989-01-01

    4C>Qa0 QQ aQD1> 4 0-4 - 4 - 4-o4 - 4 - 4->Q0 o00 > > > Cell . 0c4 IC1 l’(0< 40 I O O O O O O O O O O O O O O O O O O O (n3IU 1 m C𔃾 11.0 C3 xO O O O O...In it el4 យ C-4 il.J 4 44 4 4 4 44 4 4 4 X"""NI (D00)0) 000 (0 (04C) 1 U0I co-4 1I N4 4 4 4 4 44 4 4 4 r44 QNO 40 m NQ Is .1 II 0-4 11 0 0 0 0 00 0 0...C C II C0 1- 0 1- 11 to I MN 11 - 1-4 iil Wcs n z 2 i Z - I WNC 110010>C 20 C O>l 0 a 2 - 0- Oil El4 eJ 1140 1- 0 C’ I-i-i c Il linN - I it4 ". z - I

  5. Lead-based paint awareness, work practices, and compliance during residential construction and renovation.

    PubMed

    Blando, James D; Antoine, Nickita; Lefkowitz, Daniel

    2013-05-01

    The U.S. Environmental Protection Agency recently implemented the Renovation, Repair and Painting (RRP) rule that applies to pre-1978 residences because of the potential presence of lead-based paint. Enforcement of this rule may be difficult and therefore it is crucial to understand the awareness and beliefs of contractors and the general public because these will likely be major determinants of exposures resulting from residential renovation work. The study described in this article utilized two mailed surveys: one directed to the general public and the other directed to contractors. The surveys were conducted in New Jersey and Virginia. Field observations were also recorded for work sites in New Jersey. Results indicated a high awareness among the general public about the hazards of lead, a low level of screening by children's doctors for lead exposure, frequent use of work practices that generate lots of dust, poor hygiene among contractors, and the potential for low compliance of contractors with the RRP rule. In particular, contractors who do not believe lead is a serious health hazard are expected to have the lowest compliance with the RRP rule. These findings serve as targets for effective public health interventions through education and outreach.

  6. Spreading Activation in an Attractor Network with Latching Dynamics: Automatic Semantic Priming Revisited

    ERIC Educational Resources Information Center

    Lerner, Itamar; Bentin, Shlomo; Shriki, Oren

    2012-01-01

    Localist models of spreading activation (SA) and models assuming distributed representations offer very different takes on semantic priming, a widely investigated paradigm in word recognition and semantic memory research. In this study, we implemented SA in an attractor neural network model with distributed representations and created a unified…

  7. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China.

    PubMed

    Wu, Zezhou; Yu, Ann T W; Shen, Liyin

    2017-02-01

    The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. 48 CFR 370.701 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with the implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS...

  9. 48 CFR 370.701 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with the implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS...

  10. 48 CFR 370.701 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... with the implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS...

  11. 48 CFR 370.701 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... with the implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS...

  12. Audit of Mound Plant`s reduction in force

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-17

    Objective of this audit was to determine whether the Mound Plant`s Fiscal Year 1992 reduction in force (RIF) was effectively managed and implemented properly by DOE. DOE established policy to encourage contractors to reduce staffing by voluntary separations without unreasonable separation costs. EG&G Mound`s FY 1992 RIF was accomplished by voluntary separations; however, its implementation unreasonably increased costs because DOE did not have adequate criteria or guidelines for evaluating contractors` RIF proposals, and because EG&G Mound furnished inaccurate cost data to DOE evaluators. The unreasonable costs amounted to at least $21 million. Recommendations are made that DOE develop and implementmore » guidelines to impose limitations on voluntary separation allowances, early retirement incentive payments, and inclusion of crucial employee classifications in voluntary RIFs.« less

  13. Fingerprinting of Materials

    NASA Technical Reports Server (NTRS)

    Workman, Gary L

    1992-01-01

    Recent issues emerging in our fiscal and ecological environments have promulgated that federal agencies shall promote activities which respond to the improvement of both. In response to these developments, the National Aeronautics and Space Administration (NASA) has undertaken an innovative approach to improve the control of materials used in all NASA manufacturing activities. In concert with this goal, NASA is requiring that its contractors and their sub-contractors perform a more intensive consolidation of technologies that can provide an accounting of materials, which includes in-coming materials, materials in process, end-products and waste materials. The purpose of this handbook is to provide guidelines to NASA and its contractor personnel for the planning and implementation of chemical fingerprinting programs and to illustrate the chemical and statistical fundamentals needed for successful use of chemical fingerprinting.

  14. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  15. A Rainbow View of NASA's RS-25 Engine Test

    NASA Image and Video Library

    2017-02-22

    NASA engineers conducted their first RS-25 test of 2017 on the A-1 Test Stand at Stennis Space Center near Bay St. Louis, Mississippi, on Feb. 22, continuing to collect data on the performance of the rocket engine that will help power the new Space Launch System (SLS) rocket. Shown from the viewpoint of an overhead drone, the test of development engine No. 0528 ran the scheduled 380 seconds (six minutes and 20 seconds), allowing engineers to monitor various engine operating conditions. The test represents another step forward in development of the rocket that will launch humans aboard Orion deeper into space than ever before. Four RS-25 engines, together with a pair of solid rocket boosters, will power the SLS at launch on its deep-space missions. The engines for the first four SLS flights are former space shuttle main engines, which were tested extensively at Stennis and are some of the most proven engines in the world. Engineers are conducting an ongoing series of tests this year for SLS on both development and flight engines for future flights to ensure the engine, outfitted with a new controller, can perform at the higher level under a variety of conditions and situations. Stennis is also preparing its B-2 Test Stand to test the core stage for the first SLS flight with Orion, known as Exploration Mission-1. That testing will involve installing the flight stage on the stand and firing its four RS-25 engines simultaneously, just as during an actual launch. The Feb. 22 test was conducted by Aerojet Rocketdyne and Syncom Space Services engineers and operators. Aerojet Rocketdyne is the prime contractor for the RS-25 engines. Syncom Space Services is the prime contractor for Stennis facilities and operations. PAO Name:Kim Henry Phone Number:256-544-1899 Email Address: kimberly.m.henry@nasa.gov

  16. NASA New England Outreach Center

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The NASA New England Outreach Center in Nashua, New Hampshire was established to serve as a catalyst for heightening regional business awareness of NASA procurement, technology and commercialization opportunities. Emphasis is placed on small business participation, with the highest priority given to small disadvantaged businesses, women-owned businesses, HUBZone businesses, service disabled veteran owned businesses, and historically black colleges and universities and minority institutions. The Center assists firms and organizations to understand NASA requirements and to develop strategies to capture NASA related procurement and technology opportunities. The establishment of the NASA Outreach Center serves to stimulate business in a historically underserved area. NASA direct business awards have traditionally been highly present in the West, Midwest, South, and Southeast areas of the United States. The Center guides and assists businesses and organizations in the northeast to target opportunities within NASA and its prime contractors and capture business and technology opportunities. The Center employs an array of technology access, one-on-one meetings, seminars, site visits, and targeted conferences to acquaint Northeast firms and organizations with representatives from NASA and its prime contractors to learn about and discuss opportunities to do business and access the inventory of NASA technology. This stimulus of interaction also provides firms and organizations the opportunity to propose the use of their developed technology and ideas for current and future requirements at NASA. The Center provides a complement to the NASA Northeast Regional Technology Transfer Center in developing prospects for commercialization of NASA technology. In addition, the Center responds to local requests for assistance and NASA material and documents, and is available to address immediate concerns and needs in assessing opportunities, timely support to interact with NASA Centers on a local level, and develop easy access to information. The Center acts in the manner of a "NASA Center or Field Office" with direction from NASA Headquarters, Code K.

  17. A pipeline design of a fast prime factor DFT on a finite field

    NASA Technical Reports Server (NTRS)

    Truong, T. K.; Hsu, In-Shek; Shao, H. M.; Reed, Irving S.; Shyu, Hsuen-Chyun

    1988-01-01

    A conventional prime factor discrete Fourier transform (DFT) algorithm is used to realize a discrete Fourier-like transform on the finite field, GF(q sub n). This algorithm is developed to compute cyclic convolutions of complex numbers and to decode Reed-Solomon codes. Such a pipeline fast prime factor DFT algorithm over GF(q sub n) is regular, simple, expandable, and naturally suitable for VLSI implementation. An example illustrating the pipeline aspect of a 30-point transform over GF(q sub n) is presented.

  18. 48 CFR 370.702 - Solicitation provision.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS, Tuberculosis and Malaria Act...

  19. 48 CFR 370.702 - Solicitation provision.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS, Tuberculosis and Malaria Act...

  20. 48 CFR 370.702 - Solicitation provision.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS, Tuberculosis and Malaria Act...

Top