Long-Term Effectiveness of Accelerated Hepatitis B Vaccination Schedule in Drug Users
Shah, Dimpy P.; Grimes, Carolyn Z.; Nguyen, Anh T.; Lai, Dejian
2015-01-01
Objectives. We demonstrated the effectiveness of an accelerated hepatitis B vaccination schedule in drug users. Methods. We compared the long-term effectiveness of accelerated (0–1–2 months) and standard (0–1–6 months) hepatitis B vaccination schedules in preventing hepatitis B virus (HBV) infections and anti-hepatitis B (anti-HBs) antibody loss during 2-year follow-up in 707 drug users (HIV and HBV negative at enrollment and completed 3 vaccine doses) from February 2004 to October 2009. Results. Drug users in the accelerated schedule group had significantly lower HBV infection rates, but had a similar rate of anti-HBs antibody loss compared with the standard schedule group over 2 years of follow-up. No chronic HBV infections were observed. Hepatitis C positivity at enrollment and age younger than 40 years were independent risk factors for HBV infection and antibody loss, respectively. Conclusions. An accelerated vaccination schedule was more preferable than a standard vaccination schedule in preventing HBV infections in drug users. To overcome the disadvantages of a standard vaccination schedule, an accelerated vaccination schedule should be considered in drug users with low adherence. Our study should be repeated in different cohorts to validate our findings and establish the role of an accelerated schedule in hepatitis B vaccination guidelines for drug users. PMID:25880946
Stubbs, D A; Cohen, S L
1972-11-01
Pigeons performed on a second-order schedule in which fixed-interval components were maintained under a variable-interval schedule. Completion of each fixed-interval component resulted in a brief-stimulus presentation and/or food. The relation of the brief stimulus and food was varied across conditions. Under some conditions, the brief stimulus was never paired with food. Under other conditions, the brief stimulus was paired with food; three different pairing procedures were used: (a) a response produced the simultaneous onset of the stimulus and food; (b) a response produced the stimulus before food with the stimulus remaining on during food presentation; (c) a response produced the stimulus and the offset of the stimulus was simultaneous with the onset of the food cycle. The various pairing and nonpairing operations all produced similar effects on performance. Under all conditions, response rates were positively accelerated within fixed-interval components. Total response rates and Index of Curvature measures were similar across conditions. In one condition, a blackout was paired with food; with this different stimulus in effect, less curvature resulted. The results suggest that pairing of a stimulus is not a necessary condition for within-component patterning under some second-order schedules.
Stubbs, D. Alan; Cohen, Steven L.
1972-01-01
Pigeons performed on a second-order schedule in which fixed-interval components were maintained under a variable-interval schedule. Completion of each fixed-interval component resulted in a brief-stimulus presentation and/or food. The relation of the brief stimulus and food was varied across conditions. Under some conditions, the brief stimulus was never paired with food. Under other conditions, the brief stimulus was paired with food; three different pairing procedures were used: (a) a response produced the simultaneous onset of the stimulus and food; (b) a response produced the stimulus before food with the stimulus remaining on during food presentation; (c) a response produced the stimulus and the offset of the stimulus was simultaneous with the onset of the food cycle. The various pairing and nonpairing operations all produced similar effects on performance. Under all conditions, response rates were positively accelerated within fixed-interval components. Total response rates and Index of Curvature measures were similar across conditions. In one condition, a blackout was paired with food; with this different stimulus in effect, less curvature resulted. The results suggest that pairing of a stimulus is not a necessary condition for within-component patterning under some second-order schedules. PMID:16811634
Overview of Research Transition Products
NASA Technical Reports Server (NTRS)
Robinson, John
2014-01-01
Demonstrate increased, more consistent use of Performance- Based Navigation (PBN). Accelerate transfer of NASA scheduling and spacing technologies for inclusion in late mid-term NAS. During high-fidelity human-in-the-loop simulations of Terminal Sequencing and Spacing, air traffic controllers have significantly improved their use of PBN procedures during busy traffic periods without increased workload. Executed an aggressive, short timeframe development schedule. Developed TSS prototype based upon FAA operational systems. Conducted multiple joint FAA/NASA human-in-the-loop simulations. Performed repeated incremental deliveries of tech transfer material to non-traditional RTT stakeholders. Will continue to participate in later phases of FAA acquisition process. ATD-1 transferred Terminal Sequencing and Spacing (TSS) technologies to the FAA. TSS enables routine use of underutilized advanced avionics and PBN procedures. Potential benefits to airlines operating at initial TSS sites estimated to be $300-400M/year. FAA is planning for an initial capability in the NAS in 2018.
The Launch Processing System for Space Shuttle.
NASA Technical Reports Server (NTRS)
Springer, D. A.
1973-01-01
In order to reduce costs and accelerate vehicle turnaround, a single automated system will be developed to support shuttle launch site operations, replacing a multiplicity of systems used in previous programs. The Launch Processing System will provide real-time control, data analysis, and information display for the checkout, servicing, launch, landing, and refurbishment of the launch vehicles, payloads, and all ground support systems. It will also provide real-time and historical data retrieval for management and sustaining engineering (test records and procedures, logistics, configuration control, scheduling, etc.).
MO-E-BRD-02: Accelerated Partial Breast Irradiation in Brachytherapy: Is Shorter Better?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Todor, D.
2015-06-15
Is Non-invasive Image-Guided Breast Brachytherapy Good? – Jess Hiatt, MS Non-invasive Image-Guided Breast Brachytherapy (NIBB) is an emerging therapy for breast boost treatments as well as Accelerated Partial Breast Irradiation (APBI) using HDR surface breast brachytherapy. NIBB allows for smaller treatment volumes while maintaining optimal target coverage. Considering the real-time image-guidance and immobilization provided by the NIBB modality, minimal margins around the target tissue are necessary. Accelerated Partial Breast Irradiation in brachytherapy: is shorter better? - Dorin Todor, PhD VCU A review of balloon and strut devices will be provided together with the origins of APBI: the interstitial multi-catheter implant.more » A dosimetric and radiobiological perspective will help point out the evolution in breast brachytherapy, both in terms of devices and the protocols/clinical trials under which these devices are used. Improvements in imaging, delivery modalities and convenience are among the factors driving the ultrashort fractionation schedules but our understanding of both local control and toxicities associated with various treatments is lagging. A comparison between various schedules, from a radiobiological perspective, will be given together with a critical analysis of the issues. to review and understand the evolution and development of APBI using brachytherapy methods to understand the basis and limitations of radio-biological ‘equivalence’ between fractionation schedules to review commonly used and proposed fractionation schedules Intra-operative breast brachytherapy: Is one stop shopping best?- Bruce Libby, PhD. University of Virginia A review of intraoperative breast brachytherapy will be presented, including the Targit-A and other trials that have used electronic brachytherapy. More modern approaches, in which the lumpectomy procedure is integrated into an APBI workflow, will also be discussed. Learning Objectives: To review past and current clinical trials for IORT To discuss lumpectomy-scan-plan-treat workflow for IORT.« less
Imam, Mahmoud Hamada
2017-12-01
Hemodialysis patients possess particular attributes which increase the susceptibility to hepatitis B virus (HBV) infections. HBV vaccination significantly decreased the number of new HBV-infected patients. However, the conventional vaccination schedule requires a 6-months duration. This study aimed to examine the efficacy the accelerated vaccination schedule among hemodialysis patients. In this study, 202 consecutive hemodialysis patients at New Jeddah hospital were enrolled. The inclusion criteria were: (1) age was above 18 years, (2) all patients had undetectable HBV surface antigen and antibody. Exclusion criteria included: (1) patient had a positive serum HBV surface antigen and antibody using enzyme-linked immunosorbent assay; (2) patient received a previous course of HBV vaccine, (3) patient who was pregnant. Patients were sequentially randomized to receive either Hepatitis B recombinant DNA vaccine (conventional schedule) or to receive combined hepatitis A and B vaccine injection (accelerated schedule). Testing for HBV surface antibodies was done one and three months after completion of the dosage schedule. The primary outcome was the proportion of seroprotection (defined by serum HBV surface antibodies ≥ 10 mIU/ml). Adverse reactions were evaluated regarding both fever and post-injection pain scale. Patients' age ranged from 18 to 71 years.After 1 and 3 months of completion of the vaccination schedule, there was no statistical difference in the proportion of seroprotected patients among both groups. Accelerated vaccination schedule using combined hepatitis A and B vaccine may be beneficial for HBV seroprotection among hemodialysis patients.
NASA Technical Reports Server (NTRS)
Lathrop, J. W.
1984-01-01
Research on the reliability of terrestrial solar cells was performed to identify failure/degradation modes affecting solar cells and to relate these to basic physical, chemical, and metallurgical phenomena. Particular concerns addressed were the reliability attributes of individual single crystalline, polycrystalline, and amorphous thin film silicon cells. Results of subjecting different types of crystalline cells to the Clemson accelerated test schedule are given. Preliminary step stress results on one type of thin film amorphous silicon (a:Si) cell indicated that extraneous degradation modes were introduced above 140 C. Also described is development of measurement procedures which are applicable to the reliability testing of a:Si solar cells as well as an approach to achieving the necessary repeatability of fabricating a simulated a:Si reference cell from crystalline silicon photodiodes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Is Non-invasive Image-Guided Breast Brachytherapy Good? – Jess Hiatt, MS Non-invasive Image-Guided Breast Brachytherapy (NIBB) is an emerging therapy for breast boost treatments as well as Accelerated Partial Breast Irradiation (APBI) using HDR surface breast brachytherapy. NIBB allows for smaller treatment volumes while maintaining optimal target coverage. Considering the real-time image-guidance and immobilization provided by the NIBB modality, minimal margins around the target tissue are necessary. Accelerated Partial Breast Irradiation in brachytherapy: is shorter better? - Dorin Todor, PhD VCU A review of balloon and strut devices will be provided together with the origins of APBI: the interstitial multi-catheter implant.more » A dosimetric and radiobiological perspective will help point out the evolution in breast brachytherapy, both in terms of devices and the protocols/clinical trials under which these devices are used. Improvements in imaging, delivery modalities and convenience are among the factors driving the ultrashort fractionation schedules but our understanding of both local control and toxicities associated with various treatments is lagging. A comparison between various schedules, from a radiobiological perspective, will be given together with a critical analysis of the issues. to review and understand the evolution and development of APBI using brachytherapy methods to understand the basis and limitations of radio-biological ‘equivalence’ between fractionation schedules to review commonly used and proposed fractionation schedules Intra-operative breast brachytherapy: Is one stop shopping best?- Bruce Libby, PhD. University of Virginia A review of intraoperative breast brachytherapy will be presented, including the Targit-A and other trials that have used electronic brachytherapy. More modern approaches, in which the lumpectomy procedure is integrated into an APBI workflow, will also be discussed. Learning Objectives: To review past and current clinical trials for IORT To discuss lumpectomy-scan-plan-treat workflow for IORT.« less
Immunization Schedules for Preteens and Teens
... Immunization Schedule for Preteens and Teens (7 through 18 Years) Recommend on Facebook Tweet Share Compartir On ... a Catch-Up or Accelerated Schedule Birth through 18 Years In three easy steps, you can use ...
48 CFR 208.405 - Ordering procedures for Federal Supply Schedules.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Federal Supply Schedules. 208.405 Section 208.405 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 208.405 Ordering procedures for Federal Supply Schedules. In all orders...
The algorithm for duration acceleration of repetitive projects considering the learning effect
NASA Astrophysics Data System (ADS)
Chen, Hongtao; Wang, Keke; Du, Yang; Wang, Liwan
2018-03-01
Repetitive project optimization problem is common in project scheduling. Repetitive Scheduling Method (RSM) has many irreplaceable advantages in the field of repetitive projects. As the same or similar work is repeated, the proficiency of workers will be correspondingly low to high, and workers will gain experience and improve the efficiency of operations. This is learning effect. Learning effect is one of the important factors affecting the optimization results in repetitive project scheduling. This paper analyzes the influence of the learning effect on the controlling path in RSM from two aspects: one is that the learning effect changes the controlling path, the other is that the learning effect doesn't change the controlling path. This paper proposes corresponding methods to accelerate duration for different types of critical activities and proposes the algorithm for duration acceleration based on the learning effect in RSM. And the paper chooses graphical method to identity activities' types and considers the impacts of the learning effect on duration. The method meets the requirement of duration while ensuring the lowest acceleration cost. A concrete bridge construction project is given to verify the effectiveness of the method. The results of this study will help project managers understand the impacts of the learning effect on repetitive projects, and use the learning effect to optimize project scheduling.
Gain-Scheduled Complementary Filter Design for a MEMS Based Attitude and Heading Reference System
Yoo, Tae Suk; Hong, Sung Kyung; Yoon, Hyok Min; Park, Sungsu
2011-01-01
This paper describes a robust and simple algorithm for an attitude and heading reference system (AHRS) based on low-cost MEMS inertial and magnetic sensors. The proposed approach relies on a gain-scheduled complementary filter, augmented by an acceleration-based switching architecture to yield robust performance, even when the vehicle is subject to strong accelerations. Experimental results are provided for a road captive test during which the vehicle dynamics are in high-acceleration mode and the performance of the proposed filter is evaluated against the output from a conventional linear complementary filter. PMID:22163824
12 CFR 407.3 - Procedures applicable to regularly scheduled meetings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Procedures applicable to regularly scheduled meetings. 407.3 Section 407.3 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES REGULATIONS GOVERNING PUBLIC OBSERVATION OF EX-IM BANK MEETINGS § 407.3 Procedures applicable to regularly scheduled...
MO-E-BRD-01: Is Non-Invasive Image-Guided Breast Brachytherapy Good?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hiatt, J.
2015-06-15
Is Non-invasive Image-Guided Breast Brachytherapy Good? – Jess Hiatt, MS Non-invasive Image-Guided Breast Brachytherapy (NIBB) is an emerging therapy for breast boost treatments as well as Accelerated Partial Breast Irradiation (APBI) using HDR surface breast brachytherapy. NIBB allows for smaller treatment volumes while maintaining optimal target coverage. Considering the real-time image-guidance and immobilization provided by the NIBB modality, minimal margins around the target tissue are necessary. Accelerated Partial Breast Irradiation in brachytherapy: is shorter better? - Dorin Todor, PhD VCU A review of balloon and strut devices will be provided together with the origins of APBI: the interstitial multi-catheter implant.more » A dosimetric and radiobiological perspective will help point out the evolution in breast brachytherapy, both in terms of devices and the protocols/clinical trials under which these devices are used. Improvements in imaging, delivery modalities and convenience are among the factors driving the ultrashort fractionation schedules but our understanding of both local control and toxicities associated with various treatments is lagging. A comparison between various schedules, from a radiobiological perspective, will be given together with a critical analysis of the issues. to review and understand the evolution and development of APBI using brachytherapy methods to understand the basis and limitations of radio-biological ‘equivalence’ between fractionation schedules to review commonly used and proposed fractionation schedules Intra-operative breast brachytherapy: Is one stop shopping best?- Bruce Libby, PhD. University of Virginia A review of intraoperative breast brachytherapy will be presented, including the Targit-A and other trials that have used electronic brachytherapy. More modern approaches, in which the lumpectomy procedure is integrated into an APBI workflow, will also be discussed. Learning Objectives: To review past and current clinical trials for IORT To discuss lumpectomy-scan-plan-treat workflow for IORT.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Libby, B.
2015-06-15
Is Non-invasive Image-Guided Breast Brachytherapy Good? – Jess Hiatt, MS Non-invasive Image-Guided Breast Brachytherapy (NIBB) is an emerging therapy for breast boost treatments as well as Accelerated Partial Breast Irradiation (APBI) using HDR surface breast brachytherapy. NIBB allows for smaller treatment volumes while maintaining optimal target coverage. Considering the real-time image-guidance and immobilization provided by the NIBB modality, minimal margins around the target tissue are necessary. Accelerated Partial Breast Irradiation in brachytherapy: is shorter better? - Dorin Todor, PhD VCU A review of balloon and strut devices will be provided together with the origins of APBI: the interstitial multi-catheter implant.more » A dosimetric and radiobiological perspective will help point out the evolution in breast brachytherapy, both in terms of devices and the protocols/clinical trials under which these devices are used. Improvements in imaging, delivery modalities and convenience are among the factors driving the ultrashort fractionation schedules but our understanding of both local control and toxicities associated with various treatments is lagging. A comparison between various schedules, from a radiobiological perspective, will be given together with a critical analysis of the issues. to review and understand the evolution and development of APBI using brachytherapy methods to understand the basis and limitations of radio-biological ‘equivalence’ between fractionation schedules to review commonly used and proposed fractionation schedules Intra-operative breast brachytherapy: Is one stop shopping best?- Bruce Libby, PhD. University of Virginia A review of intraoperative breast brachytherapy will be presented, including the Targit-A and other trials that have used electronic brachytherapy. More modern approaches, in which the lumpectomy procedure is integrated into an APBI workflow, will also be discussed. Learning Objectives: To review past and current clinical trials for IORT To discuss lumpectomy-scan-plan-treat workflow for IORT.« less
Development of an accelerated reliability test schedule for terrestrial solar cells
NASA Technical Reports Server (NTRS)
Lathrop, J. W.; Prince, J. L.
1981-01-01
An accelerated test schedule using a minimum amount of tests and a minimum number of cells has been developed on the basis of stress test results obtained from more than 1500 cells of seven different cell types. The proposed tests, which include bias-temperature, bias-temperature-humidity, power cycle, thermal cycle, and thermal shock tests, use as little as 10 and up to 25 cells, depending on the test type.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Schedule of fees for products and services... Procedures for Payment § 1.1182 Schedule of fees for products and services provided by the Commission in connection with competitive bidding procedures. Product or service Fee amount Payment procedure On-line...
Psychological Distance to Reward: Effects of S+ Duration and the Delay Reduction It Signals
ERIC Educational Resources Information Center
Alessandri, Jerome; Stolarz-Fantino, Stephanie; Fantino, Edmund
2011-01-01
A concurrent-chains procedure was used to examine choice between segmented (two-component chained schedules) and unsegmented schedules (simple schedules) in terminal links with equal inter-reinforcement intervals. Previous studies using this kind of experimental procedure showed preference for unsegmented schedules for both pigeons and humans. In…
Serologic response to hepatitis B vaccination among lung transplantation candidates.
Galar, Alicia; Engelson, Brian A; Kubiak, David W; Licona, Jose H; Boukedes, Steve; Goldberg, Hilary J; Baden, Lindsey R; Marty, Francisco M; Issa, Nicolas C
2014-09-27
Optimal hepatitis B (HBV) vaccination strategies for lung transplantation (LT) candidates are not well established. LT candidates with negative anti-HBs and anti-HBc antibody titers at baseline who received standard-dose HBV vaccination (Recombivax-HB 10 mcg/mL or Engerix-B 20 mcg/mL) administered at months 0, 1, and 6 or an accelerated vaccination schedule on days 0, 7 to 14, and 21 to 28 between June 1988 and October 2012 were studied. Patients who were more likely to undergo LT within 6 months of evaluation received the accelerated vaccination schedule starting in August 2009. Ninety-six HBV-seronegative patients who completed the vaccination series and had postvaccination anti-HBs titers available were identified. Median age was 60 years; 55.2% were female, and 92.7% were white. Underlying lung diseases included COPD (44.8%), idiopathic pulmonary fibrosis (22.9%), interstitial lung disease (15.6%), and cystic fibrosis (8.3%). The overall anti-HBs response rate was 54.2%. There was no significant difference in vaccine responses between accelerated and standard vaccination schedules (54.2% vs. 54.1%; P=1.0). Patients who received steroids or other immunosuppressants before transplantation had lower response rates compared with those who did not (38.9% vs. 63.3%; P=0.03). Better vaccination strategies to improve response rate are needed in this population. The accelerated HBV vaccination schedule elicited similar anti-HBs responses as the standard schedule and could be advantageous in this population, given current organ allocation practices, and it could allow repeat vaccination series for initial nonresponders before transplantation.
Dolan, Samantha B; Patel, Manish; Hampton, Lee M; Burnett, Eleanor; Ehlman, Daniel C; Garon, Julie; Cloessner, Emily; Chmielewski, Elizabeth; Hyde, Terri B; Mantel, Carsten; Wallace, Aaron S
2017-07-01
In 2013, the World Health Organization's (WHO's) Strategic Advisory Group of Experts (SAGE) recommended that all 126 countries using only oral polio vaccine (OPV) introduce at least 1 dose of inactivated polio vaccine (IPV) into their routine immunization schedules by the end of 2015. In many countries, the addition of IPV would necessitate delivery of multiple injectable vaccines (hereafter, "multiple injections") during a single visit, with infants receiving IPV alongside pentavalent vaccine (which covers diphtheria, tetanus, and whole-cell pertussis; hepatitis B; and Haemophilus influenzae type b) and pneumococcal vaccine. Unanticipated concerns emerged from countries over acceptability of multiple injections, sites of administration, and safety. We contextualized the issues surrounding multiple injections by documenting concerns associated with administration of ≥3 injections, existing evidence in the published literature, and findings of a systematic review on administration practices and techniques. Concerns associated with multiple-injection visits were documented from meetings and personal communications with immunization program managers. Published literature on the acceptability of multiple injections by providers and caregivers was summarized, and a systematic review of the literature on administration practices was completed on the following topics: spacing between injection sites (ie, vaccine spacing), site of injection, route of injection, and procedural preparedness. WHO and United Nations Children's Fund data from 2013-2015 were used to assess multiple-injection visits included in national immunization schedules. Healthcare provider and caregiver attitudes and practices indicated concerns about infant pain, potential adverse effects, and uncertainty about vaccine effectiveness with multiple-injection visits. Published literature reinforced the record of safety and acceptance of the recommended schedule of IPV by the SAGE, but the evidence was largely from developed countries. Parental acceptance of multiple injections was associated with a positive provider recommendation to the caregiver. Findings of the systematic review identified that the intramuscular route is preferred over the subcutaneous route for vaccine administration and that the vastus lateralis muscle is preferred over the deltoid muscle for intramuscular injections. Recommendations on vaccine spacing and procedural preparedness were based on practical necessities, but comparative evidence was not identified. During 2013-2015, 85 countries added IPV to their immunization schedules, 46 (55%) of which adopted a schedule resulting in 3 injectable vaccines being administered in a single visit. The multiple-injection experience identified gaps in guidance for future vaccine introductions. Global partner organizations quickly mobilized to assess, document, and communicate the existing global experience on multiple-injection visits. This evidence-based approach provided reassurance to opinion leaders, health workers, and professional societies, thus encouraging uptake of IPV as a second or third injection in an accelerated manner globally. © The Author 2017. Published by Oxford University Press for the Infectious Diseases Society of America.
Patel, Manish; Hampton, Lee M.; Burnett, Eleanor; Ehlman, Daniel C.; Garon, Julie; Cloessner, Emily; Chmielewski, Elizabeth; Hyde, Terri B.; Mantel, Carsten; Wallace, Aaron S.
2017-01-01
Abstract Background. In 2013, the World Health Organization’s (WHO’s) Strategic Advisory Group of Experts (SAGE) recommended that all 126 countries using only oral polio vaccine (OPV) introduce at least 1 dose of inactivated polio vaccine (IPV) into their routine immunization schedules by the end of 2015. In many countries, the addition of IPV would necessitate delivery of multiple injectable vaccines (hereafter, “multiple injections”) during a single visit, with infants receiving IPV alongside pentavalent vaccine (which covers diphtheria, tetanus, and whole-cell pertussis; hepatitis B; and Haemophilus influenzae type b) and pneumococcal vaccine. Unanticipated concerns emerged from countries over acceptability of multiple injections, sites of administration, and safety. We contextualized the issues surrounding multiple injections by documenting concerns associated with administration of ≥3 injections, existing evidence in the published literature, and findings of a systematic review on administration practices and techniques. Methods. Concerns associated with multiple-injection visits were documented from meetings and personal communications with immunization program managers. Published literature on the acceptability of multiple injections by providers and caregivers was summarized, and a systematic review of the literature on administration practices was completed on the following topics: spacing between injection sites (ie, vaccine spacing), site of injection, route of injection, and procedural preparedness. WHO and United Nations Children’s Fund data from 2013–2015 were used to assess multiple-injection visits included in national immunization schedules. Results. Healthcare provider and caregiver attitudes and practices indicated concerns about infant pain, potential adverse effects, and uncertainty about vaccine effectiveness with multiple-injection visits. Published literature reinforced the record of safety and acceptance of the recommended schedule of IPV by the SAGE, but the evidence was largely from developed countries. Parental acceptance of multiple injections was associated with a positive provider recommendation to the caregiver. Findings of the systematic review identified that the intramuscular route is preferred over the subcutaneous route for vaccine administration and that the vastus lateralis muscle is preferred over the deltoid muscle for intramuscular injections. Recommendations on vaccine spacing and procedural preparedness were based on practical necessities, but comparative evidence was not identified. During 2013–2015, 85 countries added IPV to their immunization schedules, 46 (55%) of which adopted a schedule resulting in 3 injectable vaccines being administered in a single visit. Conclusion. The multiple-injection experience identified gaps in guidance for future vaccine introductions. Global partner organizations quickly mobilized to assess, document, and communicate the existing global experience on multiple-injection visits. This evidence-based approach provided reassurance to opinion leaders, health workers, and professional societies, thus encouraging uptake of IPV as a second or third injection in an accelerated manner globally. PMID:28838188
NASA Astrophysics Data System (ADS)
Izah Anuar, Nurul; Saptari, Adi
2016-02-01
This paper addresses the types of particle representation (encoding) procedures in a population-based stochastic optimization technique in solving scheduling problems known in the job-shop manufacturing environment. It intends to evaluate and compare the performance of different particle representation procedures in Particle Swarm Optimization (PSO) in the case of solving Job-shop Scheduling Problems (JSP). Particle representation procedures refer to the mapping between the particle position in PSO and the scheduling solution in JSP. It is an important step to be carried out so that each particle in PSO can represent a schedule in JSP. Three procedures such as Operation and Particle Position Sequence (OPPS), random keys representation and random-key encoding scheme are used in this study. These procedures have been tested on FT06 and FT10 benchmark problems available in the OR-Library, where the objective function is to minimize the makespan by the use of MATLAB software. Based on the experimental results, it is discovered that OPPS gives the best performance in solving both benchmark problems. The contribution of this paper is the fact that it demonstrates to the practitioners involved in complex scheduling problems that different particle representation procedures can have significant effects on the performance of PSO in solving JSP.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
... Construction Permits Scheduled for March 27, 2012; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM broadcast construction permits scheduled to commence on March 27, 2012. This... construction permits and seek comment on the procedures to be used for this auction. This auction is scheduled...
Immunization Schedules for Infants and Children
... a Catch-Up or Accelerated Schedule Birth through 18 Years In three easy steps, you can use ... See Vaccines Your Child May Need Birth through 18 Years Take the Childhood Vaccine Quiz to create ...
Code of Federal Regulations, 2014 CFR
2014-01-01
... servicing options under this subpart, the lender must accelerate the guaranteed loan and, if necessary... accelerate the guaranteed loan, with a demand letter, when the account is three scheduled payments past due... State law imposes other requirements, the lender may reinstate an accelerated account only if the...
Lopez, F; Pereira, C
1985-03-01
Two experiments used response-restriction procedures in order to test the independence of the factors determining response rate and the factors determining the size of the postreinforcement pause on interval schedules. Responding was restricted by response-produced blackout or by retracting the lever. In Experiment 1 with a Conjunctive FR 1 FT schedule, the blackout procedure reduced the postreinforcement pause more than the lever-retraction procedure did, and both procedures produced shorter pauses than did the schedule without response restriction. In Experiment 2 the interreinforcement interval was also manipulated, and the size of the pause was an increasing function of the interreinforcement interval, but the rate of increase was lower than that produced by fixed interval schedules of comparable interval durations. The assumption of functional independence of the postreinforcement pause and terminal rate in fixed interval schedules is questioned since data suggest that pause reductions resulted from constraining variation in response number compared to equivalent periodic schedules in which response number was allowed to vary. Copyright © 1985. Published by Elsevier B.V.
NASA Technical Reports Server (NTRS)
Jaap, John; Davis, Elizabeth; Richardson, Lea
2004-01-01
Planning and scheduling systems organize tasks into a timeline or schedule. Tasks are logically grouped into containers called models. Models are a collection of related tasks, along with their dependencies and requirements, that when met will produce the desired result. One challenging domain for a planning and scheduling system is the operation of on-board experiments for the International Space Station. In these experiments, the equipment used is among the most complex hardware ever developed; the information sought is at the cutting edge of scientific endeavor; and the procedures are intricate and exacting. Scheduling is made more difficult by a scarcity of station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling International Space Station experiment operations calls for a maximally expressive modeling schema.
Maximally Expressive Modeling of Operations Tasks
NASA Technical Reports Server (NTRS)
Jaap, John; Richardson, Lea; Davis, Elizabeth
2002-01-01
Planning and scheduling systems organize "tasks" into a timeline or schedule. The tasks are defined within the scheduling system in logical containers called models. The dictionary might define a model of this type as "a system of things and relations satisfying a set of rules that, when applied to the things and relations, produce certainty about the tasks that are being modeled." One challenging domain for a planning and scheduling system is the operation of on-board experiments for the International Space Station. In these experiments, the equipment used is among the most complex hardware ever developed, the information sought is at the cutting edge of scientific endeavor, and the procedures are intricate and exacting. Scheduling is made more difficult by a scarcity of station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling International Space Station experiment operations calls for a "maximally expressive" modeling schema.
Tank Riser Pit Decontamination System (Pit Viper) Return on Investment and Break-Even Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Young, Joan K.; Weimar, Mark R.; Balducci, Patrick J.
2003-06-30
This study assessed the cost benefit of Pit Viper deployment for 80 tank farm pits between October 1, 2003 and September 30, 2012 under the technical baseline for applicable double-shell tank (DST) and single-shell tank (SST) projects. After this assessment had been completed, the U.S. Department of Energy (DOE) Richland Operations Office (RL) and Office of River Protection (ORP) published the Hanford Performance Management Plan (August 2003), which accelerated the schedule for SST retrieval. Then, DOE/CH2M HILL contract modification M064 (October 2002) and The Integrated Mission Acceleration Plan (March 2003) further accelerated SST retrieval and closure schedules. Twenty-six to 40more » tanks must be retrieved by 2006. Thus the schedule for SST pit entries is accelerated and the number of SST pit entries is increased. This study estimates the return on investment (ROI) and the number of pits where Pit Viper deployment would break even or save money over current manual practices. The results of the analysis indicate a positive return on the federal investment for deployment of the Pit Viper provided it is used on a sufficient number of pits.« less
Hackenberg, T D; Hineline, P N
1992-01-01
Pigeons chose between two schedules of food presentation, a fixed-interval schedule and a progressive-interval schedule that began at 0 s and increased by 20 s with each food delivery provided by that schedule. Choosing one schedule disabled the alternate schedule and stimuli until the requirements of the chosen schedule were satisfied, at which point both schedules were again made available. Fixed-interval duration remained constant within individual sessions but varied across conditions. Under reset conditions, completing the fixed-interval schedule not only produced food but also reset the progressive interval to its minimum. Blocks of sessions under the reset procedure were interspersed with sessions under a no-reset procedure, in which the progressive schedule value increased independent of fixed-interval choices. Median points of switching from the progressive to the fixed schedule varied systematically with fixed-interval value, and were consistently lower during reset than during no-reset conditions. Under the latter, each subject's choices of the progressive-interval schedule persisted beyond the point at which its requirements equaled those of the fixed-interval schedule at all but the highest fixed-interval value. Under the reset procedure, switching occurred at or prior to that equality point. These results qualitatively confirm molar analyses of schedule preference and some versions of optimality theory, but they are more adequately characterized by a model of schedule preference based on the cumulated values of multiple reinforcers, weighted in inverse proportion to the delay between the choice and each successive reinforcer. PMID:1548449
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Schedule of charges for equipment approval, experimental radio services (or service). 1.1103 Section 1.1103 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Schedule of Statutory Charges and Procedures for Payment § 1.1103...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Schedule for Diesel Cycle Vehicles Equipped With Periodically Regenerating Trap Oxidizer Systems Certifying...
DOT National Transportation Integrated Search
2013-01-01
Each railroad covered by 49 CFR 228.407 must perform an analysis of the work schedules of its train employees who are engaged in commuter or intercity rail passenger transportation and identify those schedules that, if worked by such a train employee...
4 CFR 22.22 - Accelerated and Small Claims Procedures [Rule 22].
Code of Federal Regulations, 2013 CFR
2013-01-01
... 4 Accounts 1 2013-01-01 2013-01-01 false Accelerated and Small Claims Procedures [Rule 22]. 22.22 Section 22.22 Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES RULES OF PROCEDURE OF THE GOVERNMENT ACCOUNTABILITY OFFICE CONTRACT APPEALS BOARD § 22.22 Accelerated and Small Claims Procedures [Rule...
4 CFR 22.22 - Accelerated and Small Claims Procedures [Rule 22].
Code of Federal Regulations, 2010 CFR
2010-01-01
... 4 Accounts 1 2010-01-01 2010-01-01 false Accelerated and Small Claims Procedures [Rule 22]. 22.22 Section 22.22 Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES RULES OF PROCEDURE OF THE GOVERNMENT ACCOUNTABILITY OFFICE CONTRACT APPEALS BOARD § 22.22 Accelerated and Small Claims Procedures [Rule...
4 CFR 22.22 - Accelerated and Small Claims Procedures [Rule 22].
Code of Federal Regulations, 2011 CFR
2011-01-01
... 4 Accounts 1 2011-01-01 2011-01-01 false Accelerated and Small Claims Procedures [Rule 22]. 22.22 Section 22.22 Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES RULES OF PROCEDURE OF THE GOVERNMENT ACCOUNTABILITY OFFICE CONTRACT APPEALS BOARD § 22.22 Accelerated and Small Claims Procedures [Rule...
4 CFR 22.22 - Accelerated and Small Claims Procedures [Rule 22].
Code of Federal Regulations, 2012 CFR
2012-01-01
... 4 Accounts 1 2012-01-01 2012-01-01 false Accelerated and Small Claims Procedures [Rule 22]. 22.22 Section 22.22 Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES RULES OF PROCEDURE OF THE GOVERNMENT ACCOUNTABILITY OFFICE CONTRACT APPEALS BOARD § 22.22 Accelerated and Small Claims Procedures [Rule...
Accelerated stress testing of terrestrial solar cells
NASA Technical Reports Server (NTRS)
Lathrop, J. W.; Hawkins, D. C.; Prince, J. L.; Walker, H. A.
1982-01-01
The development of an accelerated test schedule for terrestrial solar cells is described. This schedule, based on anticipated failure modes deduced from a consideration of IC failure mechanisms, involves bias-temperature testing, humidity testing (including both 85-85 and pressure cooker stress), and thermal-cycle thermal-shock testing. Results are described for 12 different unencapsulated cell types. Both gradual electrical degradation and sudden catastrophic mechanical change were observed. These effects can be used to discriminate between cell types and technologies relative to their reliability attributes. Consideration is given to identifying laboratory failure modes which might lead to severe degradation in the field through second quadrant operation. Test results indicate that the ability of most cell types to withstand accelerated stress testing depends more on the manufacturer's design, processing, and worksmanship than on the particular metallization system. Preliminary tests comparing accelerated test results on encapsulated and unencapsulated cells are described.
Accelerating the kiln drying of oak
William T. Simpson
1980-01-01
Reducing kiln-drying time for oak lumber can reduce energy requirements as well as reduce lumber inventories. In this work, l-inch northern red oak and white oak were kiln dried from green by a combination of individual accelerating techniquesâ presurfacing, presteaming, accelerated and smooth schedule, and high-temperature drying below 18 percent moisture content....
Code of Federal Regulations, 2011 CFR
2011-07-01
... Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Appendix XV to Part 86—Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test... = Total number of regeneration emission tests. (Subscript “s” refers to standard test schedule) 5. Refer...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Appendix XV to Part 86—Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test... = Total number of regeneration emission tests. (Subscript “s” refers to standard test schedule) 5. Refer...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Appendix XV to Part 86—Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test... = Total number of regeneration emission tests. (Subscript “s” refers to standard test schedule) 5. Refer...
10 CFR 474.4 - Test procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT OF...; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... Schedule and Urban Dynamometer Driving Schedule test cycles at 40 CFR parts 86 and 600. (b) The “Special...
Frey, Sharon E.; Graham, Irene; Mulligan, Mark J.; Edupuganti, Srilatha; Jackson, Lisa A.; Wald, Anna; Poland, Gregory; Jacobson, Robert; Keyserling, Harry L.; Spearman, Paul; Hill, Heather; Wolff, Mark
2011-01-01
Background. The current US national stockpile of influenza H5 vaccine was produced using the antigen from the strain A/Vietnam/1203/2004 (a clade 1 H5 virus). Recent H5 disease has been caused by antigenically divergent H5 viruses, including A/Indonesia/05/2005 (a clade 2 H5 virus). Methods. The influence of schedule on the antibody response to 2 doses of H5 vaccines (one a clade 1 hemagglutinin protein [HA] vaccine and one a clade 2 HA vaccine) containing 90 μg of antigen was evaluated in healthy adults 18–49 years of age. Results. Two doses of vaccine were required to induce antibody titers ≥1:10 in most subjects. Accelerated schedules were immunogenic, and antibody developed after vaccinations on days 0 and 7, 0 and 14, and 0 and 28, with the day 0 and 7 schedule inducing lower titers than those induced with the other schedules. With mixed vaccine schedules of clade 1 followed by clade 2 vaccine administration, the first vaccination primed for a heterologous boost. The heterologous response was improved when the second vaccination was given 6 months after the first, compared with the response when the second vaccination was given after an interval of 1 month. Conclusions. An accelerated vaccine schedule of injections administered at days 0 and 14 was as immunogenic as a vaccine schedule of injections at days 0 and 28, but both schedules were inferior to a vaccine schedule of injections administered at 0 and 6 months for priming for heterologous vaccine boosting. Clinical Trial Registry Number: NCT00703053 PMID:21282194
Preclinical Determinants of Drug Choice under Concurrent Schedules of Drug Self-Administration
Banks, Matthew L.; Negus, S. Stevens
2012-01-01
Drug self-administration procedures have played a critical role in the experimental analysis of psychoactive compounds, such as cocaine, for over 50 years. While there are numerous permutations of this procedure, this paper will specifically focus on choice procedures using concurrent schedules of intravenous drug self-administration. The aims of this paper are to first highlight the evolution of drug choice procedures and then review the subsequent preclinical body of literature utilizing these choice procedures to understand the environmental, pharmacological, and biological determinants of the reinforcing stimulus effects of drugs. A main rationale for this paper is our proposition that choice schedules are underutilized in investigating the reinforcing effects of drugs in assays of drug self-administration. Moreover, we will conclude with potential future directions and unexplored scientific space for the use of drug choice procedures. PMID:23243420
Thompson, H S; Davies, M L; Holding, F P; Fallon, R E; Mann, A E; O'Neill, T; Roberts, J S
1999-01-01
A phase I double-blind, randomized, placebo-controlled study was carried out in healthy subjects to assess the safety and immunogenicity of TA-GW, a recombinant HPV6 L2E7 fusion protein vaccine for the treatment of genital warts. Forty-two healthy male volunteers were randomised to receive three intramuscular injections of either 0, 3, 30 or 300 microg of recombinant L2E7 adsorbed onto Alhydrogel. Two vaccination schedules were compared: weeks 0, 1 and 4 (accelerated schedule) and weeks 0, 4 and 8 (classical schedule). Subjects were monitored for adverse events throughout. Immunogenicity was assessed by measuring L2E7 specific in vitro T cell proliferative responses, production of IFNgamma and IL-5 and serum antibodies. Dose-dependent and long-lived T and B cell immune responses were elicited by TA-GW with both vaccination schedules. In conclusion, TA-GW is both safe, well-tolerated and immunogenic. The results allow the selection of the 300-microg vaccine formulation and accelerated vaccination schedule for phase II trials in patients with genital warts.
Production Scheduling for Rehabilitation Workshops.
ERIC Educational Resources Information Center
Hietala, David A.
This publication examines production scheduling procedures for sheltered workshops. The manual includes three major sections: (1) the importance and benefits of production scheduling; (2) how-to information on performing basic scheduling in the workshop; and (3) answers to the question, What makes production scheduling work? The scheduling…
5 CFR 179.308 - Accelerated procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Accelerated procedures. 179.308 Section 179.308 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CLAIMS COLLECTION STANDARDS Administrative Offset § 179.308 Accelerated procedures. OPM may make an administrative...
Alternate operating scenarios for NDCX-II
NASA Astrophysics Data System (ADS)
Sharp, W. M.; Friedman, A.; Grote, D. P.; Cohen, R. H.; Lund, S. M.; Vay, J.-L.; Waldron, W. L.
2014-01-01
NDCX-II is a newly completed accelerator facility at LBNL, built to study ion-heated warm dense matter, as well as aspects of ion-driven targets and intense-beam dynamics for inertial-fusion energy. The baseline design calls for using 12 induction cells to accelerate 30-50 nC of Li+ ions to 1.2 MeV. During commissioning, though, we plan to extend the source lifetime by extracting less total charge. Over time, we expect that NDCX-II will be upgraded to substantially higher energies, necessitating the use of heavier ions to keep a suitable deposition range in targets. For operational flexibility, the option of using a helium plasma source is also being investigated. Each of these options requires development of an alternate acceleration schedule. The schedules here are worked out with a fast-running 1-D particle-in-cell code ASP.
Code of Federal Regulations, 2011 CFR
2011-10-01
... authorize other agencies to award schedule contracts and publish schedules. For example, the Department of... CONTRACTING FEDERAL SUPPLY SCHEDULE CONTRACTING Federal Supply Schedule Program 38.101 General. (a) The... discounts. Indefinite-delivery contracts are awarded using competitive procedures to firms. The firms...
4 CFR 28.55 - Scheduling the hearing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 4 Accounts 1 2010-01-01 2010-01-01 false Scheduling the hearing. 28.55 Section 28.55 Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES GOVERNMENT ACCOUNTABILITY OFFICE PERSONNEL APPEALS BOARD; PROCEDURES APPLICABLE TO CLAIMS CONCERNING EMPLOYMENT PRACTICES AT THE GOVERNMENT ACCOUNTABILITY OFFICE...
40 CFR 305.30 - Scheduling the hearing.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Scheduling the hearing. 305.30 Section 305.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...
40 CFR 305.30 - Scheduling the hearing.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Scheduling the hearing. 305.30 Section 305.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...
40 CFR 305.30 - Scheduling the hearing.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Scheduling the hearing. 305.30 Section 305.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...
A field test of procedures for evaluating and scheduling white-pine weevil control
Robert P. Ford; Robert L. Talerico; D. Gordon Mott
1965-01-01
Procedures have recently been developed that permit economic and biological information to be integrated in making decisions about the need for control against the white-pine weevil, and in scheduling control in young white pine plantations. The procedures are based upon studies of the magnitude of economic losses that result from weevil attack in white pine and upon...
López, Florente; Menez, Marina
2012-07-01
In two experiments we examined the influence of response and time factors on the speed of acquisition of temporal control on FI schedules. In Experiment 1, prior exposure to FT accelerated the development of temporal control on FI schedules of the same temporal value. It was also found that the slower acquisition on FI with prior RT was similar to that of rats with prior standard training. In Experiment 2, prior exposure to FT accelerated the development of temporal control on a FI schedule with a threefold increase in temporal value. Additionally, it was found that with prior FI 30s training, acquisition of temporal control on FI 90s was even faster than with prior FT 30s. Measures of head-entries into the feeder along the experiments indicated that temporal control was already developed during the periodic but not during the non-periodic histories and that this control transferred to lever press during FI testing phase. Copyright © 2012 Elsevier B.V. All rights reserved.
76 FR 78702 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-19
... p.m., Eastern Time. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other... the closing of the Sherwood, Michigan post office has been filed. It identifies preliminary steps and provides a procedural schedule. Publication of this document will allow the Postal Service, petitioners...
Creation of the selection list for the Experiment Scheduling Program (ESP)
NASA Technical Reports Server (NTRS)
Deuermeyer, B. L.; Shannon, R. E.; Underbrink, A. J., Jr.
1986-01-01
The efforts to develop a procedure to construct selection groups to augment the Experiment Scheduling Program (ESP) are summarized. Included is a User's Guide and a sample scenario to guide in the use of the software system that implements the developed procedures.
76 FR 76449 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-07
... steps and provides a procedural schedule. Publication of this document will allow the Postal Service... Postal Service); December 27, 2011, 4:30 p.m., Eastern Time: Deadline for notices to intervene. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other dates of interest. ADDRESSES: Submit...
76 FR 76452 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-07
... steps and provides a procedural schedule. Publication of this document will allow the Postal Service... Postal Service); December 27, 2011, 4:30 p.m., Eastern Time: Deadline for notices to intervene. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other dates of interest. ADDRESSES: Submit...
76 FR 68235 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-03
... steps and provides a procedural schedule. Publication of this document will allow the Postal Service... Postal Service); November 22, 2011, 4:30 p.m., Eastern Time: Deadline for notices to intervene. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other dates of interest. ADDRESSES: Submit...
76 FR 78953 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-20
... p.m., Eastern Time. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other... the closing of the Mount Union, Iowa post office has been filed. It identifies preliminary steps and provides a procedural schedule. Publication of this document will allow the Postal Service, petitioners...
76 FR 72457 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-23
... steps and provides a procedural schedule. Publication of this document will allow the Postal Service... Postal Service); December 12, 2011, 4:30 p.m., Eastern Time: Deadline for notices to intervene. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other dates of interest. ADDRESSES: Submit...
76 FR 68234 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-03
... steps and provides a procedural schedule. Publication of this document will allow the Postal Service... Postal Service); November 22, 2011, 4:30 p.m., Eastern Time: Deadline for notices to intervene. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other dates of interest. ADDRESSES: Submit...
NASA Technical Reports Server (NTRS)
Lathrop, J. W.
1985-01-01
If thin film cells are to be considered a viable option for terrestrial power generation their reliability attributes will need to be explored and confidence in their stability obtained through accelerated testing. Development of a thin film accelerated test program will be more difficult than was the case for crystalline cells because of the monolithic construction nature of the cells. Specially constructed test samples will need to be fabricated, requiring committment to the concept of accelerated testing by the manufacturers. A new test schedule appropriate to thin film cells will need to be developed which will be different from that used in connection with crystalline cells. Preliminary work has been started to seek thin film schedule variations to two of the simplest tests: unbiased temperature and unbiased temperature humidity. Still to be examined are tests which involve the passage of current during temperature and/or humidity stress, either by biasing in the forward (or reverse) directions or by the application of light during stress. Investigation of these current (voltage) accelerated tests will involve development of methods of reliably contacting the thin conductive films during stress.
Mena, Guillermo; García-Basteiro, Alberto L; Llupià, Anna; Díez, Consolación; Costa, Josep; Gatell, Josep-María; García, Felipe; Bayas, José-María
2013-08-12
HIV seropositivity is considered a risk factor for complications in hepatitis A virus (HAV) infection. HAV vaccination schedules are widely implemented in HIV-infected patients, but the immune response remains impaired. We analysed the response to vaccination (antiHAV titres ≥20IU/l) in 282 HIV-infected patients included in a standard (1440 Elisa Units (EU) at 0, 6 months) or rapidly accelerated schedule (720 EU at 0, 7, 21 days and 6 months) between 1997 and 2009. Factors associated with the response to vaccination were analysed using logistic regression. The overall response rate was 73.4%. Male sex (OR: 0.16, 95% CI 0.05-0.51) and hepatitis C virus co-infection (OR: 0.30, 95% CI 0.14-0.74) were associated with a lower probability of response. Protective antibody response was associated with a higher CD4/CD8 ratio (OR: 3.69, 95% CI 1.3-10.5) and having received two doses of standard schedule (compared with patients receiving only one dose of the same schedule) (OR: 2.51, 95% CI 1.22-5.15). Three doses of the rapidly accelerated schedule were not more effective than a single dose of 1440 EU (OR: 1.32, 95% CI 0.48-3.63). The low responses observed in patients receiving a single dose suggest the need to emphasize adhesion to vaccination protocols to avoid failure. The CD4/CD8 ratio may be considered as an immune status marker which could help to better choose the moment of vaccination. Our findings underscore the importance of identifying strategies that optimize the timing and effectiveness of hepatitis A vaccination in HIV-infected patients and of the need for further studies on individual factors such as sex and hepatitis C co-infection that may affect the response to vaccination. Likewise, the sub-optimal effectiveness of three doses of 720 EU in the rapidly accelerated schedule, if confirmed in future studies, might lead to a revision of the current schedule recommended for HIV-infected travellers. Copyright © 2013 Elsevier Ltd. All rights reserved.
Gain scheduling - Potential hazards and possible remedies
NASA Technical Reports Server (NTRS)
Shamma, Jeff S.; Athans, Michael
1991-01-01
A common gain scheduling rule-of-thumb is to schedule on a slow variable. In this work, it is shown how current gain scheduling practice is necessarily limited to slow variations in the scheduling variable. These limitations are revealed to be consequences of fundamental control concepts. Furthermore, it is shown how a formulation of the gain scheduling procedure can lead toward ultimately removing these restrictions.
Costumbrado, John; Stirland, Ali; Cox, Garrett; El-Amin, Alvin Nelson; Miranda, Armidia; Carter, Ann; Malek, Mark
2012-11-06
The Centers for Disease Control and Prevention recommend vaccination for men who have sex with men (MSM) and injection drug users against hepatitis A and B. This study is the first report of a hepatitis vaccination program in a United States jail with a combined vaccine using an accelerated schedule. Los Angeles County has the largest jail system in the nation and Men's Central Jail (MCJ) is the largest facility within that system. MCJ includes a unit for self-identified MSM, where approximately 2700 inmates are housed per year. Starting in August 2007, a combined hepatitis A and B vaccine was offered to all inmates housed in this special unit. Using an accelerated schedule (0-, 7-, 21-30 days, 12-month booster), a total of 3931 doses were administered to 1633 inmates as of June 2010. Of those, 77% received 2 doses, 58% received 3 doses, and 11% received the booster dose. Inmates who screened positive for a sexually transmitted infection in this unit were 1.3 times more likely to be vaccinated (95% CI 1.2-1.4) compared to others in the same housing unit who screened negative. Hepatitis vaccination initiatives can be successfully implemented in an urban jail among an extremely high-risk population using the accelerated, combined hepatitis A/B vaccine. Ours may be a useful model for other programs to vaccinate incarcerated populations. Copyright © 2012 Elsevier Ltd. All rights reserved.
Holifield Heavy-Ion Research Facility at Oak Ridge
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, C.M.
1977-01-01
A new heavy-ion accelerator facility is now under construction at the Oak Ridge National Laboratory. A brief description of the scope and schedule of this project is given, and the new large tandem accelerator, which will be a major element of the facility is discussed in some detail. Several studies which have been made or are in progress in Oak Ridge in preparation for operation of the tandem accelerator are briefly described.
Adapting the ALP Model for Student and Institutional Needs
ERIC Educational Resources Information Center
Sides, Meredith
2016-01-01
With the increasing adoption of accelerated models of learning comes the necessary step of adapting these models to fit the unique needs of the student population at each individual institution. One such college adapted the ALP (Accelerated Learning Program) model and made specific changes to the target population, structure and scheduling, and…
ERIC Educational Resources Information Center
College and University, 1977
1977-01-01
Proceedings of AACRAO's 63rd annual meeting cover: calendar conversion; publications economy; class schedules; fraudulent transcripts; student retention; student ID numbers; veteran student reporting; financial aid reporting; faculty activity analyses; time management; registration; and transcript forms for nontraditional programs. (LBH)
A Practical Variation of a Multiple-Schedule Procedure: Brief Schedule-Correlated Stimuli
ERIC Educational Resources Information Center
Tiger, Jeffrey H.; Hanley, Gregory P.; Larsen, Kylie M.
2008-01-01
Multiple schedules using continuous discriminative stimuli have been used to minimize children's disruptive requesting for teacher attention (e.g., colored floral leis; Tiger & Hanley, 2004; Tiger, Hanley, & Heal, 2006). The present study evaluated the effectiveness of, and children's preferences for, two multiple-schedule arrangements in which…
Conception of Self-Construction Production Scheduling System
NASA Astrophysics Data System (ADS)
Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru
With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.
2006-06-01
of the system (up to 3 years depending on the profiling schedule ). Shortly after deployment, each ITP begins profiling the water column at its...was programmed with accelerated sampling schedules of multiple one-way traverses per day between 10 and 750-760 m depth in order to quickly evaluate endurance and component fatigue.
NASA Technical Reports Server (NTRS)
Chang, S. C.
1986-01-01
A two-step semidirect procedure is developed to accelerate the one-step procedure described in NASA TP-2529. For a set of constant coefficient model problems, the acceleration factor increases from 1 to 2 as the one-step procedure convergence rate decreases from + infinity to 0. It is also shown numerically that the two-step procedure can substantially accelerate the convergence of the numerical solution of many partial differential equations (PDE's) with variable coefficients.
Zangrillo, Amanda N; Fisher, Wayne W; Greer, Brian D; Owen, Todd M; DeSouza, Andresa A
2016-01-01
Previous research has supported functional communication training (FCT) as an effective intervention for reducing challenging behavior. Clinicians often program schedule-thinning procedures to increase the portability of the treatment (i.e., reinforcement is provided less frequently). For individuals with escape-maintained problem behavior, chained schedules have proven effective in increasing task completion and supplemental procedures may ameliorate reemergence of challenging behavior as access to reinforcement is decreased. The present study compared the use of a chained schedule-thinning procedure with and without alternative reinforcement (e.g., toys and activities) embedded in an intervention in which escape from the task is provided contingent on a request for a break. Two individuals with escape-maintained challenging behavior participated. We compared two treatment conditions, escape-only and escape-to-tangibles, using a single-subject, alternating treatments design with each treatment implemented in a distinct academic context. With the escape-to-tangibles treatment, we reached the final schedule in both contexts with both participants (4 successes out of 4 applications). We did not reach the final schedule with either participant with the escape-only intervention (0 successes out of 2 applications). The current results provided preliminary confirmation that providing positive plus negative reinforcement would decrease destructive behavior, increase compliance, and facilitate reinforcer-schedule thinning.
Zangrillo, Amanda N.; Fisher, Wayne W.; Greer, Brian D.; Owen, Todd M.; DeSouza, Andresa A.
2016-01-01
Objective Previous research has supported functional communication training (FCT) as an effective intervention for reducing challenging behavior. Clinicians often program schedule-thinning procedures to increase the portability of the treatment (i.e., reinforcement is provided less frequently). For individuals with escape-maintained problem behavior, chained schedules have proven effective in increasing task completion and supplemental procedures may ameliorate reemergence of challenging behavior as access to reinforcement is decreased. The present study compared the use of a chained schedule-thinning procedure with and without alternative reinforcement (e.g., toys and activities) embedded in an intervention in which escape from the task is provided contingent on a request for a break. Method Two individuals with escape-maintained challenging behavior participated. We compared two treatment conditions, escape-only and escape-to-tangibles, using a single-subject, alternating treatments design with each treatment implemented in a distinct academic context. Results With the escape-to-tangibles treatment, we reached the final schedule in both contexts with both participants (4 successes out of 4 applications). We did not reach the final schedule with either participant with the escape-only intervention (0 successes out of 2 applications). Conclusion The current results provided preliminary confirmation that providing positive plus negative reinforcement would decrease destructive behavior, increase compliance, and facilitate reinforcer-schedule thinning. PMID:28626579
Stochastic online appointment scheduling of multi-step sequential procedures in nuclear medicine.
Pérez, Eduardo; Ntaimo, Lewis; Malavé, César O; Bailey, Carla; McCormack, Peter
2013-12-01
The increased demand for medical diagnosis procedures has been recognized as one of the contributors to the rise of health care costs in the U.S. in the last few years. Nuclear medicine is a subspecialty of radiology that uses advanced technology and radiopharmaceuticals for the diagnosis and treatment of medical conditions. Procedures in nuclear medicine require the use of radiopharmaceuticals, are multi-step, and have to be performed under strict time window constraints. These characteristics make the scheduling of patients and resources in nuclear medicine challenging. In this work, we derive a stochastic online scheduling algorithm for patient and resource scheduling in nuclear medicine departments which take into account the time constraints imposed by the decay of the radiopharmaceuticals and the stochastic nature of the system when scheduling patients. We report on a computational study of the new methodology applied to a real clinic. We use both patient and clinic performance measures in our study. The results show that the new method schedules about 600 more patients per year on average than a scheduling policy that was used in practice by improving the way limited resources are managed at the clinic. The new methodology finds the best start time and resources to be used for each appointment. Furthermore, the new method decreases patient waiting time for an appointment by about two days on average.
Surgical demand scheduling: a review.
Magerlein, J M; Martin, J B
1978-01-01
This article reviews the literature on scheduling of patient demand for surgery and outlines an approach to improving overall performance of hospital surgical suites. Reported scheduling systems are categorized into those that schedule patients in advance of the surgical date and those that schedule available patients on the day of surgery. Approaches to estimating surgical procedure times are also reviewed, and the article concludes with a discussion of the failure to implement the majority of reported scheduling schemes. PMID:367987
Martinón-Torres, Federico; Carmona Martinez, Alfonso; Simkó, Róbert; Infante Marquez, Pilar; Arimany, Josep-Lluis; Gimenez-Sanchez, Francisco; Couceiro Gianzo, José Antonio; Kovács, Éva; Rojo, Pablo; Wang, Huajun; Bhusal, Chiranjiwi; Toneatto, Daniela
2018-03-01
This phase IIIb, open-label, multicentre, extension study (NCT01894919) evaluated long-term antibody persistence and booster responses in participants who received a reduced 2 + 1 or licensed 3 + 1 meningococcal serogroup B vaccine (4CMenB)-schedule (infants), or 2-dose catch-up schedule (2-10-year-olds) in parent study NCT01339923. Children aged 35 months to 12 years (N = 851) were enrolled. Follow-on participants (N = 646) were randomised 2:1 to vaccination and non-vaccination subsets; vaccination subsets received an additional 4CMenB dose. Newly enrolled vaccine-naïve participants (N = 205) received 2 catch-up doses, 1 month apart (accelerated schedule). Antibody levels were determined using human serum bactericidal assay (hSBA) against MenB indicator strains for fHbp, NadA, PorA and NHBA. Safety was also evaluated. Antibody levels declined across follow-on groups at 24-36 months versus 1 month post-vaccination. Antibody persistence and booster responses were similar between infants receiving the reduced or licensed 4CMenB-schedule. An additional dose in follow-on participants induced higher hSBA titres than a first dose in vaccine-naïve children. Two catch-up doses in vaccine-naïve participants induced robust antibody responses. No safety concerns were identified. Antibody persistence, booster responses, and safety profiles were similar with either 2 + 1 or 3 + 1 vaccination schedules. The accelerated schedule in vaccine-naïve children induced robust antibody responses. Copyright © 2017 GlaxoSmithKline SA. Published by Elsevier Ltd.. All rights reserved.
Performance and control study of a low-pressure-ratio turbojet engine for a drone aircraft
NASA Technical Reports Server (NTRS)
Seldner, K.; Geyser, L. C.; Gold, H.; Walker, D.; Burgner, G.
1972-01-01
The results of analog and digital computer studies of a low-pressure-ratio turbojet engine system for use in a drone vehicle are presented. The turbojet engine consists of a four-stage axial compressor, single-stage turbine, and a fixed area exhaust nozzle. Three simplified fuel schedules and a generalized parameter fuel control for the engine system are presented and evaluated. The evaluation is based on the performance of each schedule or control during engine acceleration from a windmill start at Mach 0.8 and 6100 meters to 100 percent corrected speed. It was found that, because of the higher acceleration margin permitted by the control, the generalized parameter control exhibited the best dynamic performance.
Epstein, Richard H; Dexter, Franklin
2015-07-01
The American Society of Anesthesiologists has embraced the concept of the Perioperative Surgical Home as a means through which anesthesiologists can add value to the health systems in which they practice. One key listed element of the Perioperative Surgical Home is to support "scheduling initiatives to reduce cancellations and increase efficiency." In this study, we explored the potential benefits of the Perioperative Surgical Home with respect to inpatient cancellations and add-on case scheduling. We evaluated 6 hypotheses related to the timing of inpatient cancellations and preoperative anesthesia evaluations. Inpatient cancellations were studied during 26 consecutive 4-week intervals between July 2012 and June 2014 at a tertiary care academic hospital. All timestamps related to scheduling, rescheduling, and cancellation activities were retrieved from the operating room (OR) case scheduling system. Timestamps when patients were seen by anesthesia residents were obtained from the preoperative evaluation system database. Batch mean methods were used to calculate means and SE. For cases cancelled, we determined whether, for "most" (>50%) cancellations, a subsequent procedure (of any type) was performed on the patient within 7 days of the cancellation. Comparisons with most and other fractions were assessed using the 1 group, 1-sided Student t test. We evaluated whether a few procedures were highly represented among the cancelled cases via the Herfindahl (Simpson's) index, comparing it with <0.15. The rate of scheduling activity was assessed by computing the number of OR scheduling office decisions in each 1-hour bin between 6:00 AM and 3:59 PM. These values were compared with ≥1 decision per hour at the study hospital. Data from 24,735 scheduled inpatient cases were assessed. Cases cancelled after 7 AM on the day before or at any time on the scheduled day of surgery accounted for 22.6% ± 0.5% (SE) of the scheduled minutes all scheduled cases, and 26.8% ± 0.4% of the case volume (i.e., number of cases). Most (83.1% ± 0.6%, P < 10) cases performed were evaluated on the day before surgery. Most (67.6% ± 1.6%, P < 10) minutes of cancelled cases were evaluated on the day before surgery. Most (62.3% ± 1.5%, P < 10) cases were seen earlier than 6:00 PM of the day before surgery. The Herfindahl index among cancelled procedures was 0.021 ± 0.001 (P < 10 compared not only to <0.15 but also to <0.05), showing large heterogeneity among the cancelled procedures. A subsequent procedure was not performed for most cancelled cases (50.6% ± 0.9% compared with >50%, P = 0.12), implying that the indication for the cancelled procedure no longer existed or the patient/family decided not to proceed with surgery. When only cancellations on the scheduled day of surgery were considered, the cancellation rate was 14.0% ± 0.3% of scheduled inpatient minutes and 11.8% ± 0.2% of scheduled inpatient cases. There were 0.59 ± 0.02 OR schedule decisions per hour per 10 ORs between 6:00 AM and 3:59 PM (P < 10, corresponding to ≥1 decision per hour at the 36 OR study hospital). The study hospital had a high inpatient cancellation rate, despite the fact that most patients whose cases were cancelled were seen by an anesthesia resident by 6:00 PM of the day before surgery. This finding suggests that further efforts to reduce the cancellations by seeing patients sooner on the day before surgery, or seeing even more patients the day before surgery, would not be an economically useful focus of the Perioperative Surgical Home. The wide heterogeneity among cancelled cases indicates that focusing on a few procedures would not materially affect the overall cancellation rate. The relatively low rate of subsequent performance of a procedure on patients whose cases had been cancelled suggests that trying to decrease the cancellation rate might be medically counterproductive. The hourly rate of decisions in the scheduling office during regular work hours on the day of surgery highlights the importance of decisions made at the OR control desk and scheduling office throughout the day to reduce the hours of overused OR time. These data suggest that efforts of the Perioperative Surgical Home related to inpatient cancellations should focus on management decision-making to mitigate the disruptions to the planned OR schedule caused by inpatient case cancellations and add-on cases, more so than on efforts to reduce inpatient cancellation rates.
Estimating Surgical Procedure Times Using Anesthesia Billing Data and Operating Room Records.
Burgette, Lane F; Mulcahy, Andrew W; Mehrotra, Ateev; Ruder, Teague; Wynn, Barbara O
2017-02-01
The median time required to perform a surgical procedure is important in determining payment under Medicare's physician fee schedule. Prior studies have demonstrated that the current methodology of using physician surveys to determine surgical times results in overstated times. To measure surgical times more accurately, we developed and validated a methodology using available data from anesthesia billing data and operating room (OR) records. We estimated surgical times using Medicare 2011 anesthesia claims and New York Statewide Planning and Research Cooperative System 2011 OR times. Estimated times were validated using data from the National Surgical Quality Improvement Program. We compared our time estimates to those used by Medicare in the fee schedule. We estimate surgical times via piecewise linear median regression models. Using 3.0 million observations of anesthesia and OR times, we estimated surgical time for 921 procedures. Correlation between these time estimates and directly measured surgical time from the validation database was 0.98. Our estimates of surgical time were shorter than the Medicare fee schedule estimates for 78 percent of procedures. Anesthesia and OR times can be used to measure surgical time and thereby improve the payment for surgical procedures in the Medicare fee schedule. © Health Research and Educational Trust.
NASA Astrophysics Data System (ADS)
Divecha, Mia S.; Derby, Jeffrey J.
2017-12-01
Historically, the melt growth of II-VI crystals has benefitted from the application of the accelerated crucible rotation technique (ACRT). Here, we employ a comprehensive numerical model to assess the impact of two ACRT schedules designed for a cadmium zinc telluride growth system per the classical recommendations of Capper and co-workers. The ;flow maximizing; ACRT schedule, with higher rotation, effectively mixes the solutal field in the melt but does not reduce supercooling adjacent to the growth interface. The ACRT schedule derived for stable Ekman flow, with lower rotation, proves more effective in reducing supercooling and promoting stable growth. These counterintuitive results highlight the need for more comprehensive studies on the optimization of ACRT schedules for specific growth systems and for desired growth outcomes.
Alternate Operating Modes For NDCX-II
NASA Astrophysics Data System (ADS)
Sharp, W. M.; Friedman, A.; Grote, D. P.; Cohen, R. H.; Lund, S. M.; Vay, J.-L.; Waldron, W. L.
2012-10-01
NDCX-II is a newly completed accelerator facility at LBNL, built to study ion-heated warm dense matter and aspects of ion-driven targets for inertial-fusion energy. The baseline design calls for using twelve induction cells to accelerate 40 nC of Li+ ions to 1.2 MeV. During commissioning, though, we plan to extend the source lifetime by extracting less total charge. For operational flexibility, the option of using a helium plasma source is also being investigated. Over time, we expect that NDCX-II will be upgraded to substantially higher energies, necessitating the use of heavier ions to keep a suitable deposition range in targets. Each of these options requires development of an alternate acceleration schedule and the associated transverse focusing. The schedules here are first worked out with a fast-running 1-D particle-in-cell code ASP, then 2-D and 3-D Warp simulations are used to verify the 1-D results and to design transverse focusing.
23 CFR 140.604 - Reimbursable schedule.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Reimbursable schedule. 140.604 Section 140.604 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.604 Reimbursable schedule. Projects to be financed from other than...
23 CFR 140.604 - Reimbursable schedule.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Reimbursable schedule. 140.604 Section 140.604 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.604 Reimbursable schedule. Projects to be financed from other than...
23 CFR 140.604 - Reimbursable schedule.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Reimbursable schedule. 140.604 Section 140.604 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.604 Reimbursable schedule. Projects to be financed from other than...
23 CFR 140.604 - Reimbursable schedule.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Reimbursable schedule. 140.604 Section 140.604 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.604 Reimbursable schedule. Projects to be financed from other than...
8 CFR 1003.18 - Scheduling of cases.
Code of Federal Regulations, 2010 CFR
2010-01-01
....18 Aliens and Nationality EXECUTIVE OFFICE FOR IMMIGRATION REVIEW, DEPARTMENT OF JUSTICE GENERAL PROVISIONS EXECUTIVE OFFICE FOR IMMIGRATION REVIEW Immigration Court-Rules of Procedure § 1003.18 Scheduling of cases. (a) The Immigration Court shall be responsible for scheduling cases and providing notice to...
A heuristic approach to incremental and reactive scheduling
NASA Technical Reports Server (NTRS)
Odubiyi, Jide B.; Zoch, David R.
1989-01-01
An heuristic approach to incremental and reactive scheduling is described. Incremental scheduling is the process of modifying an existing schedule if the initial schedule does not meet its stated initial goals. Reactive scheduling occurs in near real-time in response to changes in available resources or the occurrence of targets of opportunity. Only minor changes are made during both incremental and reactive scheduling because a goal of re-scheduling procedures is to minimally impact the schedule. The described heuristic search techniques, which are employed by the Request Oriented Scheduling Engine (ROSE), a prototype generic scheduler, efficiently approximate the cost of reaching a goal from a given state and effective mechanisms for controlling search.
A Comparison of Declarative and Hybrid Declarative-Procedural Models for Rover Operations
NASA Technical Reports Server (NTRS)
Knight, Russell; Rabideau, Gregg; Lenda, Matthew; Maldague, Pierre
2012-01-01
The MAPGEN [2] (Mixed-initiative Activity Plan GENerator) planning system is a great example of a hybrid procedural/declarative system where the advantages of each are leveraged to produce an effective planner/scheduler for Mars Exploration Rover tactical planning. We explore the adaptation of the same domain to an entirely declarative planning system (ASPEN [4] Activity Scheduling and Planning ENvironment), and demonstrate that, with some translation, much of the procedural knowledge encoding is amenable to a declarative knowledge encoding.
NASA Technical Reports Server (NTRS)
Lathrop, J. W.; Davis, C. W.; Royal, E.
1982-01-01
The use of accelerated testing methods in a program to determine the reliability attributes of terrestrial silicon solar cells is discussed. Different failure modes are to be expected when cells with and without encapsulation are subjected to accelerated testing and separate test schedules for each are described. Unencapsulated test cells having slight variations in metallization are used to illustrate how accelerated testing can highlight different diffusion related failure mechanisms. The usefulness of accelerated testing when applied to encapsulated cells is illustrated by results showing that moisture related degradation may be many times worse with some forms of encapsulation than with no encapsulation at all.
Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) schedule plan
NASA Technical Reports Server (NTRS)
1994-01-01
This report describes Aerojet's methods and procedures used to control and administer contractual schedules for the EOS/AMSU-A program. Included are the following: the master, intermediate, and detail schedules; critical path analysis; and the total program logic network diagrams.
32 CFR 169a.8 - Inventory and review schedule (Report Control Symbol DD-P&L(A)).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 1 2011-07-01 2011-07-01 false Inventory and review schedule (Report Control Symbol DD-P&L(A)). 169a.8 Section 169a.8 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Procedures § 169a.8 Inventory...
32 CFR 169a.8 - Inventory and review schedule (Report Control Symbol DD-P&L(A)).
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 1 2013-07-01 2013-07-01 false Inventory and review schedule (Report Control Symbol DD-P&L(A)). 169a.8 Section 169a.8 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Procedures § 169a.8 Inventory...
32 CFR 169a.8 - Inventory and review schedule (Report Control Symbol DD-P&L(A)).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 1 2010-07-01 2010-07-01 false Inventory and review schedule (Report Control Symbol DD-P&L(A)). 169a.8 Section 169a.8 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Procedures § 169a.8 Inventory...
Influence of temporal context on value in the multiple-chains and successive-encounters procedures.
O'Daly, Matthew; Angulo, Samuel; Gipson, Cassandra; Fantino, Edmund
2006-05-01
This set of studies explored the influence of temporal context across multiple-chain and multiple-successive-encounters procedures. Following training with different temporal contexts, the value of stimuli sharing similar reinforcement schedules was assessed by presenting these stimuli in concurrent probes. The results for the multiple-chain schedule indicate that temporal context does impact the value of a conditioned reinforcer consistent with delay-reduction theory, such that a stimulus signaling a greater reduction in delay until reinforcement has greater value. Further, nonreinforced stimuli that are concurrently presented with the preferred terminal link also have greater value, consistent with value transfer. The effects of context on value for conditions with the multiple-successive-encounters procedure, however, appear to depend on whether the search schedule or alternate handling schedule was manipulated, as well as on whether the tested stimuli were the rich or lean schedules in their components. Overall, the results help delineate the conditions under which temporal context affects conditioned-reinforcement value (acting as a learning variable) and the conditions under which it does not (acting as a performance variable), an issue of relevance to theories of choice.
48 CFR 2052.216-73 - Accelerated task order procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the work, the contractor shall proceed with performance of the task order subject to the monetary... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Accelerated task order....216-73 Accelerated task order procedures. As prescribed at 2016.506-70(b), the contracting officer may...
40 CFR 86.535-90 - Dynamometer procedure.
Code of Federal Regulations, 2014 CFR
2014-07-01
... minutes. Engine startup (with all accessories turned off), operation over the driving schedule, and engine... driving schedule complete the hot start test. The exhaust emissions are diluted with ambient air and a... Administrator. (d) Practice runs over the prescribed driving schedule may be performed at test points, provided...
40 CFR 86.535-90 - Dynamometer procedure.
Code of Federal Regulations, 2011 CFR
2011-07-01
... minutes. Engine startup (with all accessories turned off), operation over the driving schedule, and engine... driving schedule complete the hot start test. The exhaust emissions are diluted with ambient air and a... Administrator. (d) Practice runs over the prescribed driving schedule may be performed at test points, provided...
40 CFR 86.535-90 - Dynamometer procedure.
Code of Federal Regulations, 2012 CFR
2012-07-01
... minutes. Engine startup (with all accessories turned off), operation over the driving schedule, and engine... driving schedule complete the hot start test. The exhaust emissions are diluted with ambient air and a... Administrator. (d) Practice runs over the prescribed driving schedule may be performed at test points, provided...
40 CFR 86.535-90 - Dynamometer procedure.
Code of Federal Regulations, 2013 CFR
2013-07-01
... minutes. Engine startup (with all accessories turned off), operation over the driving schedule, and engine... driving schedule complete the hot start test. The exhaust emissions are diluted with ambient air and a... Administrator. (d) Practice runs over the prescribed driving schedule may be performed at test points, provided...
Project Physics Teacher Guide 1, Concepts of Motion.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
Teaching procedures of Project Physics Unit 1 are presented in this manual to help teachers make effective use of learning materials. Curriculum objectives are discussed in connection with instructional materials, suggested year time schedules, multi-media schedules, schedule blocks, resource charts, and experiment summaries. Brief analyses are…
Natsopoulou, Myrsini E; McMahon, Dino P; Paxton, Robert J
Task allocation in social insect colonies is generally organised into an age-related division of labour, termed the temporal polyethism schedule, which may in part have evolved to reduce infection of the colony's brood by pests and pathogens. The temporal polyethism schedule is sensitive to colony perturbations that may lead to adaptive changes in task allocation, maintaining colony homeostasis. Though social insects can be infected by a range of parasites, little is known of how these parasites impact within-colony behaviour and the temporal polyethism schedule. We use honey bees ( Apis mellifera ) experimentally infected by two of their emerging pathogens, Deformed wing virus (DWV), which is relatively understudied concerning its behavioural impact on its host, and the exotic microsporidian Nosema ceranae . We examined parasite effects on host temporal polyethism and patterns of activity within the colony. We found that pathogens accelerated the temporal polyethism schedule, but without reducing host behavioural repertoire. Infected hosts exhibited increased hyperactivity, allocating more time to self-grooming and foraging-related tasks. The strength of behavioural alterations we observed was found to be pathogen specific; behavioural modifications were more pronounced in virus-treated hosts versus N. ceranae -treated hosts, with potential benefits for the colony in terms of reducing within-colony transmission. Investigating the effects of multiple pathogens on behavioural patterns of social insects could play a crucial role in understanding pathogen spread within a colony and their effects on colony social organisation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Divecha, Mia S.; Derby, Jeffrey J.
Historically, the melt growth of II-VI crystals has benefitted by the application of the accelerated crucible rotation technique (ACRT). Here, we employ a comprehensive numerical model to assess the impact of two ACRT schedules designed for a cadmium zinc telluride growth system per the classical recommendations of Capper and co-workers. The “flow maximizing” ACRT schedule, with higher rotation, effectively mixes the solutal field in the melt but does not reduce supercooling adjacent to the growth interface. The ACRT schedule derived for stable Ekman flow, with lower rotation, proves more effective in reducing supercooling and promoting stable growth. Furthermore, these counterintuitivemore » results highlight the need for more comprehensive studies on the optimization of ACRT schedules for specific growth systems and for desired growth outcomes.« less
Divecha, Mia S.; Derby, Jeffrey J.
2017-10-03
Historically, the melt growth of II-VI crystals has benefitted by the application of the accelerated crucible rotation technique (ACRT). Here, we employ a comprehensive numerical model to assess the impact of two ACRT schedules designed for a cadmium zinc telluride growth system per the classical recommendations of Capper and co-workers. The “flow maximizing” ACRT schedule, with higher rotation, effectively mixes the solutal field in the melt but does not reduce supercooling adjacent to the growth interface. The ACRT schedule derived for stable Ekman flow, with lower rotation, proves more effective in reducing supercooling and promoting stable growth. Furthermore, these counterintuitivemore » results highlight the need for more comprehensive studies on the optimization of ACRT schedules for specific growth systems and for desired growth outcomes.« less
Hayes, Kathryn J; Eljiz, Kathy; Dadich, Ann; Fitzgerald, Janna-Anneke; Sloan, Terry
2015-01-01
The purpose of this paper is to provide a retrospective analysis of computer simulation's role in accelerating individual innovation adoption decisions. The process innovation examined is Lean Systems Thinking, and the organizational context is the imaging department of an Australian public hospital. Intrinsic case study methods including observation, interviews with radiology and emergency personnel about scheduling procedures, mapping patient appointment processes and document analysis were used over three years and then complemented with retrospective interviews with key hospital staff. The multiple data sources and methods were combined in a pragmatic and reflexive manner to explore an extreme case that provides potential to act as an instructive template for effective change. Computer simulation of process change ideas offered by staff to improve patient-flow accelerated the adoption of the process changes, largely because animated computer simulation permitted experimentation (trialability), provided observable predictions of change results (observability) and minimized perceived risk. The difficulty of making accurate comparisons between time periods in a health care setting is acknowledged. This work has implications for policy, practice and theory, particularly for inducing the rapid diffusion of process innovations to address challenges facing health service organizations and national health systems. Originality/value - The research demonstrates the value of animated computer simulation in presenting the need for change, identifying options, and predicting change outcomes and is the first work to indicate the importance of trialability, observability and risk reduction in individual adoption decisions in health services.
Evaluations of Some Scheduling Algorithms for Hard Real-Time Systems
1990-06-01
construct because the mechanism is a dispatching procedure. Since all nonpreemptive schedules are contained in the set of all preemptive schedules, the...optimal value of Tmax in the preemptive case is at least a lower bound on the optimal Tmax for the nonpreemptive schedules. This principle is the basis...23 b. Nonpreemptable Version .............................................. 24 4. The Minimize Maximum Tardiness with Earliest Start
40 CFR 86.135-90 - Dynamometer procedure.
Code of Federal Regulations, 2012 CFR
2012-07-01
... startup and operation over the first 505 seconds of the driving schedule complete the hot start test. The... 505 seconds of the driving schedule complete the hot start test. The exhaust emissions are diluted... over the prescribed driving schedule may be performed at test point, provided an emission sample is not...
40 CFR 86.135-90 - Dynamometer procedure.
Code of Federal Regulations, 2013 CFR
2013-07-01
... startup and operation over the first 505 seconds of the driving schedule complete the hot start test. The... 505 seconds of the driving schedule complete the hot start test. The exhaust emissions are diluted... over the prescribed driving schedule may be performed at test point, provided an emission sample is not...
40 CFR 78.13 - Scheduling orders and pre-hearing conferences.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Scheduling orders and pre-hearing conferences. 78.13 Section 78.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPEAL PROCEDURES § 78.13 Scheduling orders and pre-hearing conferences. (a) If a...
Morais-Almeida, Mário; Arêde, Cristina; Sampaio, Graça; Borrego, Luis Miguel
2016-01-01
Traditional subcutaneous immunotherapy up dosing with allergenic extracts has been shown to be associated with frequent adverse reactions. In recent studies it has been demonstrated that using modified extracts, namely allergoids, it is a safe and effective procedure particularly on accelerated schedules. However data assessing its safety in paediatric age is scarce. To evaluate the safety profile in paediatric population of using modified allergen extracts, in an ultrarush schedule, to reach the maintenance dose in the first day. We included children undergoing treatment with subcutaneous immunotherapy during a five-year period, using modified aeroallergen extracts, depigmented, polymerized with glutaraldehyde and adsorbed on aluminium hydroxide using an ultrarush induction phase. The type of adverse reactions during the ultrarush protocol was recorded. We studied 100 paediatric patients (57 males) with a mean age of 11.6 years (5 to 18 years; standard deviation, 3.3), all with moderate to severe persistent rhinitis, with or without allergic conjunctivitis, asthma and atopic eczema, sensitized to mites and/or pollens. All reached the maintenance dose of 0.5 mL in the first day, except 1 child. During the ultrarush protocol the total number of injections was 199. There were 21 local adverse reactions in 11 patients, 11 immediate and 10 delayed; from those, had clinical relevance 1 immediate and 4 delayed. Systemic reactions were recorded in 2 cases, both immediate and mild. The ultrarush protocol, without premedication, was a safe alternative to be used in paediatric age during the induction phase of subcutaneous immunotherapy using allergoid depigmented extracts.
Arêde, Cristina; Sampaio, Graça; Borrego, Luis Miguel
2016-01-01
Background Traditional subcutaneous immunotherapy up dosing with allergenic extracts has been shown to be associated with frequent adverse reactions. In recent studies it has been demonstrated that using modified extracts, namely allergoids, it is a safe and effective procedure particularly on accelerated schedules. However data assessing its safety in paediatric age is scarce. Objective To evaluate the safety profile in paediatric population of using modified allergen extracts, in an ultrarush schedule, to reach the maintenance dose in the first day. Methods We included children undergoing treatment with subcutaneous immunotherapy during a five-year period, using modified aeroallergen extracts, depigmented, polymerized with glutaraldehyde and adsorbed on aluminium hydroxide using an ultrarush induction phase. The type of adverse reactions during the ultrarush protocol was recorded. Results We studied 100 paediatric patients (57 males) with a mean age of 11.6 years (5 to 18 years; standard deviation, 3.3), all with moderate to severe persistent rhinitis, with or without allergic conjunctivitis, asthma and atopic eczema, sensitized to mites and/or pollens. All reached the maintenance dose of 0.5 mL in the first day, except 1 child. During the ultrarush protocol the total number of injections was 199. There were 21 local adverse reactions in 11 patients, 11 immediate and 10 delayed; from those, had clinical relevance 1 immediate and 4 delayed. Systemic reactions were recorded in 2 cases, both immediate and mild. Conclusion The ultrarush protocol, without premedication, was a safe alternative to be used in paediatric age during the induction phase of subcutaneous immunotherapy using allergoid depigmented extracts. PMID:26844218
Hybrid glowworm swarm optimization for task scheduling in the cloud environment
NASA Astrophysics Data System (ADS)
Zhou, Jing; Dong, Shoubin
2018-06-01
In recent years many heuristic algorithms have been proposed to solve task scheduling problems in the cloud environment owing to their optimization capability. This article proposes a hybrid glowworm swarm optimization (HGSO) based on glowworm swarm optimization (GSO), which uses a technique of evolutionary computation, a strategy of quantum behaviour based on the principle of neighbourhood, offspring production and random walk, to achieve more efficient scheduling with reasonable scheduling costs. The proposed HGSO reduces the redundant computation and the dependence on the initialization of GSO, accelerates the convergence and more easily escapes from local optima. The conducted experiments and statistical analysis showed that in most cases the proposed HGSO algorithm outperformed previous heuristic algorithms to deal with independent tasks.
Space experiments with particle accelerators (SEPAC): Description of instrumentation
NASA Technical Reports Server (NTRS)
Taylor, W. W. L.; Roberts, W. T.; Reasoner, D. L.; Chappell, C. R.; Baker, B. B.; Burch, J. L.; Gibson, W. C.; Black, R. K.; Tomlinson, W. M.; Bounds, J. R.
1987-01-01
SEPAC (Space Experiments with Particle Accelerators) flew on Spacelab 1 (SL 1) in November and December 1983. SEPAC is a joint U.S.-Japan investigation of the interaction of electron, plasma, and neutral beams with the ionosphere, atmosphere and magnetosphere. It is scheduled to fly again on Atlas 1 in August 1990. On SL 1, SEPAC used an electron accelerator, a plasma accelerator, and neutral gas source as active elements and an array of diagnostics to investigate the interactions. For Atlas 1, the plasma accelerator will be replaced by a plasma contactor and charge collection devices to improve vehicle charging meutralization. This paper describes the SEPAC instrumentation in detail for the SL 1 and Atlas 1 flights and includes a bibliography of SEPAC papers.
Model-based Acceleration Control of Turbofan Engines with a Hammerstein-Wiener Representation
NASA Astrophysics Data System (ADS)
Wang, Jiqiang; Ye, Zhifeng; Hu, Zhongzhi; Wu, Xin; Dimirovsky, Georgi; Yue, Hong
2017-05-01
Acceleration control of turbofan engines is conventionally designed through either schedule-based or acceleration-based approach. With the widespread acceptance of model-based design in aviation industry, it becomes necessary to investigate the issues associated with model-based design for acceleration control. In this paper, the challenges for implementing model-based acceleration control are explained; a novel Hammerstein-Wiener representation of engine models is introduced; based on the Hammerstein-Wiener model, a nonlinear generalized minimum variance type of optimal control law is derived; the feature of the proposed approach is that it does not require the inversion operation that usually upsets those nonlinear control techniques. The effectiveness of the proposed control design method is validated through a detailed numerical study.
Yamanaka, Yujiro; Hashimoto, Satoko; Tanahashi, Yusuke; Nishide, Shin-Ya; Honma, Sato; Honma, Ken-Ichi
2010-03-01
Effects of timed physical exercise were examined on the reentrainment of sleep-wake cycle and circadian rhythms to an 8-h phase-advanced sleep schedule. Seventeen male adults spent 12 days in a temporal isolation facility with dim light conditions (<10 lux). The sleep schedule was phase-advanced by 8 h from their habitual sleep times for 4 days, which was followed by a free-run session for 6 days, during which the subjects were deprived of time cues. During the shift schedule, the exercise group (n = 9) performed physical exercise with a bicycle ergometer in the early and middle waking period for 2 h each. The control group (n = 8) sat on a chair at those times. Their sleep-wake cycles were monitored every day by polysomnography and/or weight sensor equipped with a bed. The circadian rhythm in plasma melatonin was measured on the baseline day before phase shift: on the 4th day of shift schedule and the 5th day of free-run. As a result, the sleep-onset on the first day of free-run in the exercise group was significantly phase-advanced from that in the control and from the baseline. On the other hand, the circadian melatonin rhythm was significantly phase-delayed in the both groups, showing internal desynchronization of the circadian rhythms. The sleep-wake cycle resynchronized to the melatonin rhythm by either phase-advance or phase-delay shifts in the free-run session. These findings indicate that the reentrainment of the sleep-wake cycle to a phase-advanced schedule occurs independent of the circadian pacemaker and is accelerated by timed physical exercise.
Simulation of time-control procedures for terminal area flow management
NASA Technical Reports Server (NTRS)
Alcabin, M.; Erzberger, H.; Tobias, L.; Obrien, P. J.
1985-01-01
Simulations of a terminal area traffic-management system incorporating automated scheduling and time-control (four-dimensional) techniques conducted at NASA Ames Research Center jointly with the Federal Aviation Administration, have shown that efficient procedures can be developed for handling a mix of 4D-equipped and conventionally equipped aircraft. A crucial role in this system is played by an ATC host computer algorithm, referred to as a speed advisory, that allows controllers to maintain accurate time schedules of the conventionally equipped aircraft in the traffic mix. Results are of the most recent simulations in which two important special cases were investigated. First, the effects of a speed advisory on touchdown time scheduling are examined, when unequipped aircraft are constrained to follow fuel-optimized profiles in the near-terminal area, and rescheduling procedures are developed to handle missed approaches of 4D-equipped aircraft. Various performance measures, including controller opinion, are used to evaluate the effectiveness of the procedures.
Vehicle Test Procedure Driving Schedules
DOT National Transportation Integrated Search
1977-03-01
This report discusses the salient characteristics of driving schedules which are currently being used to determine automotive fuel economy, exhaust emissions, and component characteristics. The analyses discussed and the results reported highlight th...
Bulk Leisure--Problem or Blessing?
ERIC Educational Resources Information Center
Beland, Robert M.
1983-01-01
With an increasing number of the nation's work force experiencing "bulk leisure" time because of new work scheduling procedures, parks and recreation offices are encouraged to examine their program scheduling and content. (JM)
Pigeons' Choices between Fixed-Interval and Random-Interval Schedules: Utility of Variability?
ERIC Educational Resources Information Center
Andrzejewski, Matthew E.; Cardinal, Claudia D.; Field, Douglas P.; Flannery, Barbara A.; Johnson, Michael; Bailey, Kathleen; Hineline, Philip N.
2005-01-01
Pigeons' choosing between fixed-interval and random-interval schedules of reinforcement was investigated in three experiments using a discrete-trial procedure. In all three experiments, the random-interval schedule was generated by sampling a probability distribution at an interval (and in multiples of the interval) equal to that of the…
12 CFR 404.9 - Schedule of fees.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Schedule of fees. 404.9 Section 404.9 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES INFORMATION DISCLOSURE Procedures for Disclosure of Records Under the Freedom of Information Act. § 404.9 Schedule of fees. (a) General. Ex-Im Bank shall...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-06
... Construction Permits Scheduled for March 29, 2011; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM construction permits scheduled to commence on March 29, 2011 (Auction 91). This... Telecommunications and the Media Bureaus (the Bureaus) announce an auction of certain FM Broadcast construction...
Increasing operating room efficiency through electronic medical record analysis.
Attaallah, A F; Elzamzamy, O M; Phelps, A L; Ranganthan, P; Vallejo, M C
2016-05-01
We used electronic medical record (EMR) analysis to determine errors in operating room (OR) time utilisation. Over a two year period EMR data of 44,503 surgical procedures was analysed for OR duration, on-time, first case, and add-on time performance, within 19 surgical specialties. Maximal OR time utilisation at our institution could have saved over 302,620 min or 5,044 hours of OR efficiency over a two year period. Most specialties (78.95%) had inaccurately scheduled procedure times and therefore used the OR more than their scheduled allotment time. Significant differences occurred between the mean scheduled surgical durations (101.38 ± 87.11 min) and actual durations (108.18 ± 102.27 min; P < 0.001). Significant differences also occurred between the mean scheduled add-on durations (111.4 ± 75.5 min) and the actual add-on scheduled durations (118.6 ± 90.1 minutes; P < 0.001). EMR quality improvement analysis can be used to determine scheduling error and bias, in order to improve efficiency and increase OR time utilisation.
Hubble Systems Optimize Hospital Schedules
NASA Technical Reports Server (NTRS)
2009-01-01
Don Rosenthal, a former Ames Research Center computer scientist who helped design the Hubble Space Telescope's scheduling software, co-founded Allocade Inc. of Menlo Park, California, in 2004. Allocade's OnCue software helps hospitals reclaim unused capacity and optimize constantly changing schedules for imaging procedures. After starting to use the software, one medical center soon reported noticeable improvements in efficiency, including a 12 percent increase in procedure volume, 35 percent reduction in staff overtime, and significant reductions in backlog and technician phone time. Allocade now offers versions for outpatient and inpatient magnetic resonance imaging (MRI), ultrasound, interventional radiology, nuclear medicine, Positron Emission Tomography (PET), radiography, radiography-fluoroscopy, and mammography.
Interactive experimenters' planning procedures and mission control
NASA Technical Reports Server (NTRS)
Desjardins, R. L.
1973-01-01
The computerized mission control and planning system routinely generates a 24-hour schedule in one hour of operator time by including time dimensions into experimental planning procedures. Planning is validated interactively as it is being generated segment by segment in the frame of specific event times. The planner simply points a light pen at the time mark of interest on the time line for entering specific event times into the schedule.
Construction machine control guidance implementation strategy.
DOT National Transportation Integrated Search
2010-07-01
Machine Controlled Guidance (MCG) technology may be used in roadway and bridge construction to improve construction efficiencies, potentially resulting in reduced project costs and accelerated schedules. The technology utilizes a Global Positioning S...
Intensity-Modulated Radiation Therapy (IMRT)
... specialized training in the field of radiation oncology physics, ensures the linear accelerator delivers the precise radiation ... critical normal structures, as well as the patient's health. Typically, patients are scheduled for IMRT sessions five ...
40 CFR 86.115-78 - EPA urban dynamometer driving schedule.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission.... time relationships. They each consist of a distinct nonrepetitive series of idle, acceleration, cruise...
40 CFR 86.115-78 - EPA urban dynamometer driving schedule.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission.... time relationships. They each consist of a distinct nonrepetitive series of idle, acceleration, cruise...
40 CFR 86.115-78 - EPA urban dynamometer driving schedule.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission.... time relationships. They each consist of a distinct nonrepetitive series of idle, acceleration, cruise...
Spectroscopic measurements of plasma emission light for plasma-based acceleration experiments
NASA Astrophysics Data System (ADS)
Filippi, F.; Anania, M. P.; Biagioni, A.; Chiadroni, E.; Cianchi, A.; Ferrario, M.; Mostacci, A.; Palumbo, L.; Zigler, A.
2016-09-01
Advanced particle accelerators are based on the excitation of large amplitude plasma waves driven by either electron or laser beams. Future experiments scheduled at the SPARC_LAB test facility aim to demonstrate the acceleration of high brightness electron beams through the so-called resonant Plasma Wakefield Acceleration scheme in which a train of electron bunches (drivers) resonantly excites wakefields into a preformed hydrogen plasma; the last bunch (witness) injected at the proper accelerating phase gains energy from the wake. The quality of the accelerated beam depends strongly on plasma density and its distribution along the acceleration length. The measurements of plasma density of the order of 1016-1017 cm-3 can be performed with spectroscopic measurements of the plasma-emitted light. The measured density distribution for hydrogen filled capillary discharge with both Balmer alpha and Balmer beta lines and shot-to-shot variation are here reported.
Effects of workload preview on task scheduling during simulated instrument flight.
Andre, A D; Heers, S T; Cashion, P A
1995-01-01
Our study examined pilot scheduling behavior in the context of simulated instrument flight. Over the course of the flight, pilots flew along specified routes while scheduling and performing several flight-related secondary tasks. The first phase of flight was flown under low-workload conditions, whereas the second phase of flight was flown under high-workload conditions in the form of increased turbulence and a disorganized instrument layout. Six pilots were randomly assigned to each of three workload preview groups. Subjects in the no-preview group were not given preview of the increased-workload conditions. Subjects in the declarative preview group were verbally informed of the nature of the flight workload manipulation but did not receive any practice under the high-workload conditions. Subjects in the procedural preview group received the same instructions as the declarative preview group but also flew half of the practice flight under the high-workload conditions. The results show that workload preview fostered efficient scheduling strategies. Specifically, those pilots with either declarative or procedural preview of future workload demands adopted an efficient strategy of scheduling more of the difficult secondary tasks during the low-workload phase of flight. However, those pilots given a procedural preview showed the greatest benefits in overall flight performance.
Guédon, Annetje C P; Paalvast, M; Meeuwsen, F C; Tax, D M J; van Dijke, A P; Wauben, L S G L; van der Elst, M; Dankelman, J; van den Dobbelsteen, J J
2016-12-01
Operating Room (OR) scheduling is crucial to allow efficient use of ORs. Currently, the predicted durations of surgical procedures are unreliable and the OR schedulers have to follow the progress of the procedures in order to update the daily planning accordingly. The OR schedulers often acquire the needed information through verbal communication with the OR staff, which causes undesired interruptions of the surgical process. The aim of this study was to develop a system that predicts in real-time the remaining procedure duration and to test this prediction system for reliability and usability in an OR. The prediction system was based on the activation pattern of one single piece of equipment, the electrosurgical device. The prediction system was tested during 21 laparoscopic cholecystectomies, in which the activation of the electrosurgical device was recorded and processed in real-time using pattern recognition methods. The remaining surgical procedure duration was estimated and the optimal timing to prepare the next patient for surgery was communicated to the OR staff. The mean absolute error was smaller for the prediction system (14 min) than for the OR staff (19 min). The OR staff doubted whether the prediction system could take all relevant factors into account but were positive about its potential to shorten waiting times for patients. The prediction system is a promising tool to automatically and objectively predict the remaining procedure duration, and thereby achieve optimal OR scheduling and streamline the patient flow from the nursing department to the OR.
Maximally Expressive Task Modeling
NASA Technical Reports Server (NTRS)
Japp, John; Davis, Elizabeth; Maxwell, Theresa G. (Technical Monitor)
2002-01-01
Planning and scheduling systems organize "tasks" into a timeline or schedule. The tasks are defined within the scheduling system in logical containers called models. The dictionary might define a model of this type as "a system of things and relations satisfying a set of rules that, when applied to the things and relations, produce certainty about the tasks that are being modeled." One challenging domain for a planning and scheduling system is the operation of on-board experiment activities for the Space Station. The equipment used in these experiments is some of the most complex hardware ever developed by mankind, the information sought by these experiments is at the cutting edge of scientific endeavor, and the procedures for executing the experiments are intricate and exacting. Scheduling is made more difficult by a scarcity of space station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling space station experiment operations calls for a "maximally expressive" modeling schema. Modeling even the simplest of activities cannot be automated; no sensor can be attached to a piece of equipment that can discern how to use that piece of equipment; no camera can quantify how to operate a piece of equipment. Modeling is a human enterprise-both an art and a science. The modeling schema should allow the models to flow from the keyboard of the user as easily as works of literature flowed from the pen of Shakespeare. The Ground Systems Department at the Marshall Space Flight Center has embarked on an effort to develop a new scheduling engine that is highlighted by a maximally expressive modeling schema. This schema, presented in this paper, is a synergy of technological advances and domain-specific innovations.
40 CFR 86.515-78 - EPA urban dynamometer driving schedule.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission... nonrepetitive series of idle, acceleration, cruise, and deceleration modes of various time sequences and rates...
40 CFR 86.515-78 - EPA urban dynamometer driving schedule.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission... nonrepetitive series of idle, acceleration, cruise, and deceleration modes of various time sequences and rates...
40 CFR 86.515-78 - EPA urban dynamometer driving schedule.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission... nonrepetitive series of idle, acceleration, cruise, and deceleration modes of various time sequences and rates...
40 CFR 86.115-78 - EPA dynamometer driving schedules.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission..., acceleration, cruise, and deceleration modes of various time sequences and rates. (b) The driver should attempt...
40 CFR 86.515-78 - EPA urban dynamometer driving schedule.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission... nonrepetitive series of idle, acceleration, cruise, and deceleration modes of various time sequences and rates...
Deploying Darter A Cray XC30 System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fahey, Mark R; Budiardja, Reuben D; Crosby, Lonnie D
TheUniversityofTennessee,KnoxvilleacquiredaCrayXC30 supercomputer, called Darter, with a peak performance of 248.9 Ter- aflops. Darter was deployed in late March of 2013 with a very aggressive production timeline - the system was deployed, accepted, and placed into production in only 2 weeks. The Spring Experiment for the Center for Analysis and Prediction of Storms (CAPS) largely drove the accelerated timeline, as the experiment was scheduled to start in mid-April. The Consortium for Advanced Simulation of Light Water Reactors (CASL) project also needed access and was able to meet their tight deadlines on the newly acquired XC30. Darter s accelerated deployment and op-more » erations schedule resulted in substantial scientific impacts within the re- search community as well as immediate real-world impacts such as early severe tornado warnings« less
Choice with a fixed requirement for food, and the generality of the matching relation
Stubbs, D. Alan; Dreyfus, Leon R.; Fetterman, J. Gregor; Dorman, Lana G.
1986-01-01
Pigeons were trained on choice procedures in which responses on each of two keys were reinforced probabilistically, but only after a schedule requirement had been met. Under one arrangement, a fixed-interval choice procedure was used in which responses were not reinforced until the interval was over; then a response on one key would be reinforced, with the effective key changing irregularly from interval to interval. Under a second, fixed-ratio choice procedure, responses on either key counted towards completion of the ratio and then, once the ratio had been completed, a response on the probabilistically selected key would produce food. In one experiment, the schedule requirements were varied for both fixed-interval and fixed-ratio schedules. In the second experiment, relative reinforcement rate was varied. And in a third experiment, the duration of an intertrial interval separating choices was varied. The results for 11 pigeons across all three experiments indicate that there were often large deviations between relative response rates and relative reinforcement rates. Overall performance measures were characterized by a great deal of variability across conditions. More detailed measures of choice across the schedule requirement were also quite variable across conditions. In spite of this variability, performance was consistent across conditions in its efficiency of producing food. The absence of matching of behavior allocation to reinforcement rate indicates an important difference between the present procedures and other choice procedures; that difference raises questions about the specific conditions that lead to matching as an outcome. PMID:16812452
18 CFR 154.202 - Filings to initiate a new rate schedule.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Filings to initiate a new rate schedule. 154.202 Section 154.202 Conservation of Power and Water Resources FEDERAL ENERGY... Procedures for Changing Tariffs § 154.202 Filings to initiate a new rate schedule. (a) When the filing is to...
18 CFR 154.202 - Filings to initiate a new rate schedule.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Filings to initiate a new rate schedule. 154.202 Section 154.202 Conservation of Power and Water Resources FEDERAL ENERGY... Procedures for Changing Tariffs § 154.202 Filings to initiate a new rate schedule. (a) When the filing is to...
18 CFR 154.202 - Filings to initiate a new rate schedule.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Filings to initiate a new rate schedule. 154.202 Section 154.202 Conservation of Power and Water Resources FEDERAL ENERGY... Procedures for Changing Tariffs § 154.202 Filings to initiate a new rate schedule. (a) When the filing is to...
18 CFR 154.202 - Filings to initiate a new rate schedule.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Filings to initiate a new rate schedule. 154.202 Section 154.202 Conservation of Power and Water Resources FEDERAL ENERGY... Procedures for Changing Tariffs § 154.202 Filings to initiate a new rate schedule. (a) When the filing is to...
18 CFR 154.202 - Filings to initiate a new rate schedule.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Filings to initiate a new rate schedule. 154.202 Section 154.202 Conservation of Power and Water Resources FEDERAL ENERGY... Procedures for Changing Tariffs § 154.202 Filings to initiate a new rate schedule. (a) When the filing is to...
49 CFR Appendix C to Part 221 - Schedule of Civil Penalties 1
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Schedule of Civil Penalties 1 C Appendix C to Part.... 221, App. C Appendix C to Part 221—Schedule of Civil Penalties 1 Section Violation Willful violation...,000 (b), (c) improper inspection 2,500 5,000 221.16Inspection procedure: (a) Failure to obtain...
49 CFR Appendix C to Part 221 - Schedule of Civil Penalties 1
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Schedule of Civil Penalties 1 C Appendix C to Part.... 221, App. C Appendix C to Part 221—Schedule of Civil Penalties 1 Section Violation Willful violation...,000 (b), (c) improper inspection 2,500 5,000 221.16Inspection procedure: (a) Failure to obtain...
49 CFR Appendix C to Part 221 - Schedule of Civil Penalties 1
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Schedule of Civil Penalties 1 C Appendix C to Part.... 221, App. C Appendix C to Part 221—Schedule of Civil Penalties 1 Section Violation Willful violation...,000 (b), (c) improper inspection 2,500 5,000 221.16Inspection procedure: (a) Failure to obtain...
Progress of the Felsenkeller Shallow-Underground Accelerator for Nuclear Astrophysics
NASA Astrophysics Data System (ADS)
Bemmerer, D.; Cavanna, F.; Cowan, T. E.; Grieger, M.; Hensel, T.; Junghans, A. R.; Ludwig, F.; Müller, S. E.; Rimarzig, B.; Reinicke, S.; Schulz, S.; Schwengner, R.; Stöckel, K.; Szücs, T.; Takács, M. P.; Wagner, A.; Wagner, L.; Zuber, K.
Low-background experiments with stable ion beams are an important tool for putting the model of stellar hydrogen, helium, and carbon burning on a solid experimental foundation. The pioneering work in this regard has been done by the LUNA collaboration at Gran Sasso, using a 0.4 MV accelerator. In the present contribution, the status of the project for a higher-energy underground accelerator is reviewed. Two tunnels of the Felsenkeller underground site in Dresden, Germany, are currently being refurbished for the installation of a 5 MV high-current Pelletron accelerator. Construction work is on schedule and expected to complete in August 2017. The accelerator will provide intense, 50 µA, beams of 1H+, 4He+, and 12C+ ions, enabling research on astrophysically relevant nuclear reactions with unprecedented sensitivity.
Production scheduling and rescheduling with genetic algorithms.
Bierwirth, C; Mattfeld, D C
1999-01-01
A general model for job shop scheduling is described which applies to static, dynamic and non-deterministic production environments. Next, a Genetic Algorithm is presented which solves the job shop scheduling problem. This algorithm is tested in a dynamic environment under different workload situations. Thereby, a highly efficient decoding procedure is proposed which strongly improves the quality of schedules. Finally, this technique is tested for scheduling and rescheduling in a non-deterministic environment. It is shown by experiment that conventional methods of production control are clearly outperformed at reasonable run-time costs.
Baseline tests of the power-train electric delivery van
NASA Technical Reports Server (NTRS)
Lumannick, S.; Dustin, M. O.; Bozek, J. M.
1977-01-01
Vehicle maximum speed, range at constant speed, range over stop-and-go driving schedules, maximum acceleration, gradeability, gradeability limit, road energy consumption, road power, indicated energy consumption, braking capability, battery charger efficiency, and battery characteristics were determined for a modified utility van powered by sixteen 6-volt batteries connected in series. A chopper controller actuated by a foot accelerator pedal changes the voltage applied to the 22-kilowatt (30-hp) series-wound drive motor. In addition to the conventional hydraulic braking system, the vehicle has hydraulic regenerative braking. Cycle tests and acceleration tests were conducted with and without hydraulic regeneration.
NASA Astrophysics Data System (ADS)
Ramli, Razamin; Tein, Lim Huai
2016-08-01
A good work schedule can improve hospital operations by providing better coverage with appropriate staffing levels in managing nurse personnel. Hence, constructing the best nurse work schedule is the appropriate effort. In doing so, an improved selection operator in the Evolutionary Algorithm (EA) strategy for a nurse scheduling problem (NSP) is proposed. The smart and efficient scheduling procedures were considered. Computation of the performance of each potential solution or schedule was done through fitness evaluation. The best so far solution was obtained via special Maximax&Maximin (MM) parent selection operator embedded in the EA, which fulfilled all constraints considered in the NSP.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
... Effectiveness of Proposed Rule Change To Modify Its Fee Schedule December 20, 2013. Pursuant to Section 19(b)(1... Rules & Procedures (``Rules'') of NSCC to modify its fee schedule, as more fully described below. II... The purpose of the proposed rule change is to revise NSCC's fee schedule (as listed in Addendum A of...
Scheduling for anesthesia at geographic locations remote from the operating room.
Dexter, Franklin; Wachtel, Ruth E
2014-08-01
Providing general anesthesia at locations away from the operating room, called remote locations, poses many medical and scheduling challenges. This review discusses how to schedule procedures at remote locations to maximize anesthesia productivity (see Video, Supplemental Digital Content 1). Anesthesia labour productivity can be maximized by assigning one or more 8-h or 10-h periods of allocated time every 2 weeks dedicated specifically to each remote specialty that has enough cases to fill those periods. Remote specialties can then schedule their cases themselves into their own allocated time. Periods of allocated time (called open, unblocked or first come first served time) can be used by remote locations that do not have their own allocated time. Unless cases are scheduled sequentially into allocated time, there will be substantial extra underutilized time (time during which procedures are not being performed and personnel sit idle even though staffing has been planned) and a concomitant reduction in percent productivity. Allocated time should be calculated on the basis of usage. Remote locations with sufficient hours of cases should be allocated time reserved especially for them in which to schedule their cases, with a maximum waiting time of 2 weeks, to achieve an average wait of 1 week.
Accelerating Large Scale Image Analyses on Parallel, CPU-GPU Equipped Systems
Teodoro, George; Kurc, Tahsin M.; Pan, Tony; Cooper, Lee A.D.; Kong, Jun; Widener, Patrick; Saltz, Joel H.
2014-01-01
The past decade has witnessed a major paradigm shift in high performance computing with the introduction of accelerators as general purpose processors. These computing devices make available very high parallel computing power at low cost and power consumption, transforming current high performance platforms into heterogeneous CPU-GPU equipped systems. Although the theoretical performance achieved by these hybrid systems is impressive, taking practical advantage of this computing power remains a very challenging problem. Most applications are still deployed to either GPU or CPU, leaving the other resource under- or un-utilized. In this paper, we propose, implement, and evaluate a performance aware scheduling technique along with optimizations to make efficient collaborative use of CPUs and GPUs on a parallel system. In the context of feature computations in large scale image analysis applications, our evaluations show that intelligently co-scheduling CPUs and GPUs can significantly improve performance over GPU-only or multi-core CPU-only approaches. PMID:25419545
The procedure execution manager and its application to Advanced Photon Source operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Borland, M.
1997-06-01
The Procedure Execution Manager (PEM) combines a complete scripting environment for coding accelerator operation procedures with a manager application for executing and monitoring the procedures. PEM is based on Tcl/Tk, a supporting widget library, and the dp-tcl extension for distributed processing. The scripting environment provides support for distributed, parallel execution of procedures along with join and abort operations. Nesting of procedures is supported, permitting the same code to run as a top-level procedure under operator control or as a subroutine under control of another procedure. The manager application allows an operator to execute one or more procedures in automatic, semi-automatic,more » or manual modes. It also provides a standard way for operators to interact with procedures. A number of successful applications of PEM to accelerator operations have been made to date. These include start-up, shutdown, and other control of the positron accumulator ring (PAR), low-energy transport (LET) lines, and the booster rf systems. The PAR/LET procedures make nested use of PEM`s ability to run parallel procedures. There are also a number of procedures to guide and assist tune-up operations, to make accelerator physics measurements, and to diagnose equipment. Because of the success of the existing procedures, expanded use of PEM is planned.« less
1989-12-01
to construct because the mechanism is a dispatching procedure. Since all nonpreemptive schedules are contained in the set of all preemptive schedules...the optimal value of T’.. in the preemptive case is at least a lower bound on the optimal T., for the nonpreemptive schedules. This principle is the...adapt to changes in the enviro.nment. In hard real-time systems, tasks are also distinguished as preemptable and nonpreemptable . A task is preemptable
Results of Rolling Resistance Measurements of Twelve Radial Passenger Car Tires
DOT National Transportation Integrated Search
1980-01-01
The Calspan Tire Research Facility is described, including the test procedure, a tire test schedule, and a tire identification schedule for testing low-rolling resistance radial passenger car tires. The equilibrium rolling resistance was measured on ...
Code of Federal Regulations, 2010 CFR
2010-01-01
... (CONTINUED) SALES REGULATION PROCEDURES FOR ACQUISITION OF PETROLEUM FOR THE STRATEGIC PETROLEUM RESERVE § 626.1 Purpose. This part establishes the procedures for acquiring petroleum for, and deferring contractually scheduled deliveries to, the Strategic Petroleum Reserve. The procedures do not represent actual...
Code of Federal Regulations, 2011 CFR
2011-01-01
... (CONTINUED) SALES REGULATION PROCEDURES FOR ACQUISITION OF PETROLEUM FOR THE STRATEGIC PETROLEUM RESERVE § 626.1 Purpose. This part establishes the procedures for acquiring petroleum for, and deferring contractually scheduled deliveries to, the Strategic Petroleum Reserve. The procedures do not represent actual...
NASA Astrophysics Data System (ADS)
Tang, Li; Liu, Jing-Ning; Feng, Dan; Tong, Wei
2008-12-01
Existing security solutions in network storage environment perform poorly because cryptographic operations (encryption and decryption) implemented in software can dramatically reduce system performance. In this paper we propose a cryptographic hardware accelerator on dynamically reconfigurable platform for the security of high performance network storage system. We employ a dynamic reconfigurable platform based on a FPGA to implement a PowerPCbased embedded system, which executes cryptographic algorithms. To reduce the reconfiguration latency, we apply prefetch scheduling. Moreover, the processing elements could be dynamically configured to support different cryptographic algorithms according to the request received by the accelerator. In the experiment, we have implemented AES (Rijndael) and 3DES cryptographic algorithms in the reconfigurable accelerator. Our proposed reconfigurable cryptographic accelerator could dramatically increase the performance comparing with the traditional software-based network storage systems.
The Focusing Optics X-ray Solar Imager: Second Flight and Recent Results
NASA Astrophysics Data System (ADS)
Christe, S.; Krucker, S.; Glesener, L.; Ishikawa, S. N.; Ramsey, B.; Buitrago Casas, J. C.; Foster, N.
2014-12-01
Solar flares accelerate particles up to high energies through various acceleration mechanisms which are not currently understood. Hard X-rays are the most direct diagnostic of flare-accelerated electrons. However past and current hard x-ray observation lack the sensitivity and dynamic range necessary to observe the faint signature of accelerated electrons in the acceleration region, the solar corona. These limitations can be easily overcome through the use of HXR focusing optics coupled with solid state pixelated detectors. We present on recent updates on the FOXSI sounding rocket program. During its first flight FOXSI observed imaged a microflare with simultaneous observations by RHESSI. We present recent imaging analysis of the FOXSI observations and detailed comparison with RHESSI. New detector calibration results are also presented and, time-permitting, preliminary results from the second launch of FOXSI scheduled for December 2014.
Regionally Aligned Forces: Concept Viability and Implementation
2015-03-01
forced the Army to accelerate cuts scheduled to occur by the end of FY15.5 While acceleration provides short term savings, projected cuts will affect...Concept Viability and Implementation 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER...mitigate the effects of reduced budgets, the Army will continue to reduce its overall end strength. Reduction initiatives will require the force to be
Estimating the cost of major ongoing cost plus hardware development programs
NASA Technical Reports Server (NTRS)
Bush, J. C.
1990-01-01
Approaches are developed for forecasting the cost of major hardware development programs while these programs are in the design and development C/D phase. Three approaches are developed: a schedule assessment technique for bottom-line summary cost estimation, a detailed cost estimation approach, and an intermediate cost element analysis procedure. The schedule assessment technique was developed using historical cost/schedule performance data.
ERIC Educational Resources Information Center
Allan, Blaine W., Comp.
The procedures, forms, and philosophy of the computerized modular scheduling program developed at Virgin Valley High School are outlined. The modular concept is eveloped as a new approach to course structure with explanations, examples, and worksheets included. Examples of courses of study, input information for the data processing center, output…
Alternate Operating Scenarios for NDCX-II
NASA Astrophysics Data System (ADS)
Sharp, W. M.; Friedman, A.; Grote, D. P.; Cohen, R. H.; Lund, S. M.; Vay, J.-L.; Waldron, W. L.; Yeun, A.
2011-10-01
NDCX-II is an accelerator facility being built at LBNL to study ion-heated warm dense matter and aspects of ion-driven targets for inertial-fusion energy. The baseline design calls for using twelve induction cells to accelerate 40 nC of Li+ ions to 1.2 MeV. During commissioning, though, we plan to extend the source lifetime by extracting less total charge. For operational flexibility, the option of using a helium plasma source is also being investigated. Over time, we expect that NDCX-II will be upgraded to substantially higher energies, necessitating the use of heavier ions to keep a suitable deposition range in targets. Each of these options requires development of an alternate acceleration schedule and the associated transverse focusing. The schedules here are first worked out with a fast-running 1-D particle-in-cell code ASP, then 2-D and 3-D Warp simulations are used to verify the 1-D results and to design transverse focusing. Work performed under the auspices of U.S. Department of Energy by LLNL under Contract DE-AC52-07NA27344 and by LBNL under Contract DE-AC03-76SF00098.
Efficient Execution of Microscopy Image Analysis on CPU, GPU, and MIC Equipped Cluster Systems.
Andrade, G; Ferreira, R; Teodoro, George; Rocha, Leonardo; Saltz, Joel H; Kurc, Tahsin
2014-10-01
High performance computing is experiencing a major paradigm shift with the introduction of accelerators, such as graphics processing units (GPUs) and Intel Xeon Phi (MIC). These processors have made available a tremendous computing power at low cost, and are transforming machines into hybrid systems equipped with CPUs and accelerators. Although these systems can deliver a very high peak performance, making full use of its resources in real-world applications is a complex problem. Most current applications deployed to these machines are still being executed in a single processor, leaving other devices underutilized. In this paper we explore a scenario in which applications are composed of hierarchical data flow tasks which are allocated to nodes of a distributed memory machine in coarse-grain, but each of them may be composed of several finer-grain tasks which can be allocated to different devices within the node. We propose and implement novel performance aware scheduling techniques that can be used to allocate tasks to devices. We evaluate our techniques using a pathology image analysis application used to investigate brain cancer morphology, and our experimental evaluation shows that the proposed scheduling strategies significantly outperforms other efficient scheduling techniques, such as Heterogeneous Earliest Finish Time - HEFT, in cooperative executions using CPUs, GPUs, and MICs. We also experimentally show that our strategies are less sensitive to inaccuracy in the scheduling input data and that the performance gains are maintained as the application scales.
Efficient Execution of Microscopy Image Analysis on CPU, GPU, and MIC Equipped Cluster Systems
Andrade, G.; Ferreira, R.; Teodoro, George; Rocha, Leonardo; Saltz, Joel H.; Kurc, Tahsin
2015-01-01
High performance computing is experiencing a major paradigm shift with the introduction of accelerators, such as graphics processing units (GPUs) and Intel Xeon Phi (MIC). These processors have made available a tremendous computing power at low cost, and are transforming machines into hybrid systems equipped with CPUs and accelerators. Although these systems can deliver a very high peak performance, making full use of its resources in real-world applications is a complex problem. Most current applications deployed to these machines are still being executed in a single processor, leaving other devices underutilized. In this paper we explore a scenario in which applications are composed of hierarchical data flow tasks which are allocated to nodes of a distributed memory machine in coarse-grain, but each of them may be composed of several finer-grain tasks which can be allocated to different devices within the node. We propose and implement novel performance aware scheduling techniques that can be used to allocate tasks to devices. We evaluate our techniques using a pathology image analysis application used to investigate brain cancer morphology, and our experimental evaluation shows that the proposed scheduling strategies significantly outperforms other efficient scheduling techniques, such as Heterogeneous Earliest Finish Time - HEFT, in cooperative executions using CPUs, GPUs, and MICs. We also experimentally show that our strategies are less sensitive to inaccuracy in the scheduling input data and that the performance gains are maintained as the application scales. PMID:26640423
Controls for and constraints on auto-shaping
Bilbrey, John; Winokur, Stephen
1973-01-01
Auto-shaping the pigeon's key-peck response was examined as a respondent conditioning procedure with the use of Rescorla's truly-random control procedure. In the first experiment, pigeons received presentations of brief light on the response key and brief presentations of food where the light and the food were independently presented. All birds failed to key peck after many light and food presentations, but explicit pairing of the light and food rapidly conditioned pecking to the light. Experiment 2 showed that even when an independent light/food presentation schedule was reduced to variable-time 30 sec, additional naive birds would not key peck and only one bird pecked when the schedules were variable-time 15 sec. A third experiment examined an explicit-unpairing control procedure, where the light and food were not only presented on independent schedules but were also separated by a minimum time, and found that auto-shaping did not occur. A fourth experiment investigated a number of control procedures and found them ineffective. A fifth experiment investigated the effects of a physical separation of the locus of the response key and the food dispenser, and a sixth experiment investigated using a tone in place of the light. It was concluded that pecking is generated by auto-shaping procedures only when an intermittently presented keylight is regularly paired with food. PMID:16811710
Accelerated laboratory weathering of acrylic lens materials
NASA Astrophysics Data System (ADS)
Arndt, Thomas; Richter, Steffen; Kogler, René; Pasierb, Mike; Walby, Christopher
2015-09-01
Flat samples from various poly(methyl methacrylate) (PMMA) formulations were subjected to outdoor weathering in Arizona and Florida, EMMAQUA® accelerated outdoor weathering, and two accelerated laboratory weathering procedures at 3 Sun irradiance which, imitate dry (Arizona) and wet (Florida) conditions. The main mode of degradation is yellowing and not the generation of haze for any weathering procedure within the investigated radiant exposure. Higher UV absorber concentrations lead to smaller changes in optical properties and in the resulting relative concentrator photovoltaic (CPV) module efficiencies. Comparison of sample properties after various weathering procedures reveals that the influence of weathering factors other than radiant exposure depends on the sample as well.
Constraint-based integration of planning and scheduling for space-based observatory management
NASA Technical Reports Server (NTRS)
Muscettola, Nicola; Smith, Steven F.
1994-01-01
Progress toward the development of effective, practical solutions to space-based observatory scheduling problems within the HSTS scheduling framework is reported. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) short-term observation scheduling problem. The work was motivated by the limitations of the current solution and, more generally, by the insufficiency of classical planning and scheduling approaches in this problem context. HSTS has subsequently been used to develop improved heuristic solution techniques in related scheduling domains and is currently being applied to develop a scheduling tool for the upcoming Submillimeter Wave Astronomy Satellite (SWAS) mission. The salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research are summarized. Then, some key problem decomposition techniques underlying the integrated planning and scheduling approach to the HST problem are described; research results indicate that these techniques provide leverage in solving space-based observatory scheduling problems. Finally, more recently developed constraint-posting scheduling procedures and the current SWAS application focus are summarized.
A simple procedure for the estimation of neutron skyshine from proton accelerators.
Stevenson, G R; Thomas, R H
1984-01-01
Recent calculations of neutron diffusion at an air/ground interface have enabled the establishment of a very simple procedure for estimating neutron dose equivalent at large distances from proton accelerators in the energy range 10 MeV to several tens of GeV.
21 CFR 113.83 - Establishing scheduled processes.
Code of Federal Regulations, 2011 CFR
2011-04-01
... procedures recognized by competent processing authorities. If incubation tests are necessary for process... the period of instituting the process. The incubation tests for confirmation of the scheduled... and associated incubation tests shall be prepared and shall be permanently retained by the person or...
24 CFR 982.517 - Utility allowance schedule.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., the PHA also must provide any information or procedures used in preparation of the schedule. (b) How... services according to the following general categories: space heating; air conditioning; cooking; water heating; water; sewer; trash collection (disposal of waste and refuse); other electric; refrigerator (cost...
40 CFR 155.44 - Establish schedules for registration review.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Establish schedules for registration review. 155.44 Section 155.44 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.44...
Surgeon and type of anesthesia predict variability in surgical procedure times.
Strum, D P; Sampson, A R; May, J H; Vargas, L G
2000-05-01
Variability in surgical procedure times increases the cost of healthcare delivery by increasing both the underutilization and overutilization of expensive surgical resources. To reduce variability in surgical procedure times, we must identify and study its sources. Our data set consisted of all surgeries performed over a 7-yr period at a large teaching hospital, resulting in 46,322 surgical cases. To study factors associated with variability in surgical procedure times, data mining techniques were used to segment and focus the data so that the analyses would be both technically and intellectually feasible. The data were subdivided into 40 representative segments of manageable size and variability based on headers adopted from the common procedural terminology classification. Each data segment was then analyzed using a main-effects linear model to identify and quantify specific sources of variability in surgical procedure times. The single most important source of variability in surgical procedure times was surgeon effect. Type of anesthesia, age, gender, and American Society of Anesthesiologists risk class were additional sources of variability. Intrinsic case-specific variability, unexplained by any of the preceding factors, was found to be highest for shorter surgeries relative to longer procedures. Variability in procedure times among surgeons was a multiplicative function (proportionate to time) of surgical time and total procedure time, such that as procedure times increased, variability in surgeons' surgical time increased proportionately. Surgeon-specific variability should be considered when building scheduling heuristics for longer surgeries. Results concerning variability in surgical procedure times due to factors such as type of anesthesia, age, gender, and American Society of Anesthesiologists risk class may be extrapolated to scheduling in other institutions, although specifics on individual surgeons may not. This research identifies factors associated with variability in surgical procedure times, knowledge of which may ultimately be used to improve surgical scheduling and operating room utilization.
77 FR 4550 - Promising and Practical Strategies to Increase Postsecondary Success
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-30
... Education. Appendix A: Standard Keywords and Tags Accelerated Learning Achievement Gap Closure Adult Education Affordability Assessment Technology Badges Basic Skills Blended Learning Block Scheduling [[Page... Collection/Use Degree Attainment Developmental/Remedial Education Digital Materials Dual Degrees Earn and...
A Systems Approach to Military Construction.
1982-11-01
Unclassi fled I150. OECL ASSI F1C ATI ON/ DOWNGRADING I SCHEDULE IS. DISYR1EUTION STATEMENT (ot this Repo"t) Approved for public release; distribution...30 Procurement Alternatives 30 Design Alternatives 33 Preconcept Control Data 34 AE Selection Procedure 36 Scheduling 40 Cost Estimating 44 4...data, scheduling , and cost estimating. The objectives of project coordination for a systems-oriented project do not differ from those of a
Factors associated with attendance to scheduled outpatient endoscopy
Laiyemo, Adeyinka O.; Williams, Carla D.; Burnside, Clinton; Moghadam, Sepideh; Sanasi-Bhola, Kamla D.; Kwagyan, John; Brim, Hassan; Ashktorab, Hassan; Scott, Victor F.; Smoot, Duane T.
2015-01-01
Background Non-attendance of 42% has been reported for outpatient colonoscopy among persons with low socioeconomic status (SES) in an open access system in the United States. Objectives To evaluate attendance to outpatient endoscopy among populations with low SES after in-person consultations with endoscopists prior to scheduling. Methods Retrospectively, we reviewed the endoscopy schedule from September 2009 to August 2010 in an inner city teaching hospital in Washington DC. We identified patients who came for their procedures. We defined non-attendance as when patients did not notify the facility up to 24 hours prior to their scheduled procedures and did not show up . Results A total of 3,304 patients were scheduled for outpatient endoscopy (mean age 55.2 years; 59.5% females). Only 36 (1.1%) patients were uninsured. 716 (21.7%) patients did not show up for their procedures. There were no differences in attendance by age, sex and race. Patients seen in a private endoscopist's office (OR=1.47; 95%CI: 1.07–2.04) were more likely to attend when compared to patients seen in trainees’ continuity clinic. Married patients (OR=1.40; 95%CI: 1.11–1.78) were also more likely to attend. Conversely, Medicaid and uninsured patients were less likely to attend. Restricting our analysis to patients scheduled for only colonoscopy yielded similar results except that patients who were 50 years and older were more likely to attend. Conclusions Our study suggests improved attendance to endoscopy when populations with lower SES undergo prior consultation with an endoscopist. There is a potential to further improve attendance to out-patient endoscopy by directly involving the social support of the patients. PMID:25180285
Factors associated with attendance to scheduled outpatient endoscopy.
Laiyemo, Adeyinka O; Williams, Carla D; Burnside, Clinton; Moghadam, Sepideh; Sanasi-Bhola, Kamla D; Kwagyan, John; Brim, Hassan; Ashktorab, Hassan; Scott, Victor F; Smoot, Duane T
2014-10-01
Non-attendance of 42% has been reported for outpatient colonoscopy among persons with low socioeconomic status (SES) in an open access system in the USA. To evaluate attendance to outpatient endoscopy among populations with low SES after inperson consultations with endoscopists prior to scheduling. Retrospectively, we reviewed the endoscopy schedule from September 2009 to August 2010 in an inner city teaching hospital in Washington, DC. We identified patients who came for their procedures. We defined non-attendance as when patients did not notify the facility up to 24 h prior to their scheduled procedures and did not show up. A total of 3304 patients were scheduled for outpatient endoscopy (mean age 55.2 years; 59.5% women). Only 36 (1.1%) patients were uninsured. 716 (21.7%) patients did not show up for their procedures. There were no differences in attendance by age, sex and race. Patients seen in a private endoscopist's office (OR=1.47; 95% CI 1.07 to 2.04) were more likely to attend when compared with patients seen in trainees' continuity clinic. Married patients (OR=1.40; 95% CI 1.11 to 1.78) were also more likely to attend. Conversely, Medicaid and uninsured patients were less likely to attend. Restricting our analysis to patients scheduled for only colonoscopy yielded similar results except that patients aged 50 years and older were more likely to attend. Our study suggests improved attendance to endoscopy when populations with lower SES undergo prior consultation with an endoscopist. There is a potential to further improve attendance to outpatient endoscopy by directly involving the social support of the patients. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
NASA Technical Reports Server (NTRS)
Mcdermott, P. P.
1980-01-01
The design of an accelerated life test program for electric batteries is discussed. A number of observations and suggestions on the procedures and objectives for conducting an accelerated life test program are presented. Equations based on nonlinear regression analysis for predicting the accelerated life test parameters are discussed.
Stepaniak, Pieter S; Vrijland, Wietske W; de Quelerij, Marcel; de Vries, Guus; Heij, Christiaan
2010-12-01
If variation in procedure times could be controlled or better predicted, the cost of surgeries could be reduced through improved scheduling of surgical resources. This study on the impact of similar consecutive cases on the turnover, surgical, and procedure times tests the perception that repeating the same manual tasks reduces the duration of these tasks. We hypothesize that when a fixed team works on similar consecutive cases the result will be shorter turnover and procedure duration as well as less variation as compared with the situation without a fixed team. Case-control study. St Franciscus Hospital, a large general teaching hospital in Rotterdam, the Netherlands. Two procedures, inguinal hernia repair and laparoscopic cholecystectomy, were selected and divided across a control group and a study group. Patients were randomly assigned to the study or control group. Preparation time, surgical time, procedure time, and turnover time. For inguinal hernia repair, we found a significantly lower preparation time and 10 minutes less procedure time in the study group, as compared with the control group. Variation in the study group was lower, as compared with the control group. For laparoscopic cholecystectomy, preparation time was significantly lower in the study group, as compared with the control group. For both procedures, there was a significant decrease in turnover time. Scheduling similar consecutive cases and performing with a fixed team results in lower turnover times and preparation times. The procedure time of the inguinal hernia repair decreased significantly and has practical scheduling implications. For more complex surgery, like laparoscopic cholecystectomy, there is no effect on procedure time.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biebesheimer, E.
This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Corrective Actions/Compliance Schedule Approval Report for the subject facility, contains the corrective actions required to bring the facility into compliance as a result of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. These actions are delineated in the Compliance Schedule Approvals which also contain; noncompliances, risks, compensatory measures, schedules for corrective actions, justifications for approval, and resource impacts.
Application of decentralized cooperative problem solving in dynamic flexible scheduling
NASA Astrophysics Data System (ADS)
Guan, Zai-Lin; Lei, Ming; Wu, Bo; Wu, Ya; Yang, Shuzi
1995-08-01
The object of this study is to discuss an intelligent solution to the problem of task-allocation in shop floor scheduling. For this purpose, the technique of distributed artificial intelligence (DAI) is applied. Intelligent agents (IAs) are used to realize decentralized cooperation, and negotiation is realized by using message passing based on the contract net model. Multiple agents, such as manager agents, workcell agents, and workstation agents, make game-like decisions based on multiple criteria evaluations. This procedure of decentralized cooperative problem solving makes local scheduling possible. And by integrating such multiple local schedules, dynamic flexible scheduling for the whole shop floor production can be realized.
A comparison of multiprocessor scheduling methods for iterative data flow architectures
NASA Technical Reports Server (NTRS)
Storch, Matthew
1993-01-01
A comparative study is made between the Algorithm to Architecture Mapping Model (ATAMM) and three other related multiprocessing models from the published literature. The primary focus of all four models is the non-preemptive scheduling of large-grain iterative data flow graphs as required in real-time systems, control applications, signal processing, and pipelined computations. Important characteristics of the models such as injection control, dynamic assignment, multiple node instantiations, static optimum unfolding, range-chart guided scheduling, and mathematical optimization are identified. The models from the literature are compared with the ATAMM for performance, scheduling methods, memory requirements, and complexity of scheduling and design procedures.
A Concept for Robust, High Density Terminal Air Traffic Operations
NASA Technical Reports Server (NTRS)
Isaacson, Douglas R.; Robinson, John E.; Swenson, Harry N.; Denery, Dallas G.
2010-01-01
This paper describes a concept for future high-density, terminal air traffic operations that has been developed by interpreting the Joint Planning and Development Office s vision for the Next Generation (NextGen) Air Transportation System and coupling it with emergent NASA and other technologies and procedures during the NextGen timeframe. The concept described in this paper includes five core capabilities: 1) Extended Terminal Area Routing, 2) Precision Scheduling Along Routes, 3) Merging and Spacing, 4) Tactical Separation, and 5) Off-Nominal Recovery. Gradual changes are introduced to the National Airspace System (NAS) by phased enhancements to the core capabilities in the form of increased levels of automation and decision support as well as targeted task delegation. NASA will be evaluating these conceptual technological enhancements in a series of human-in-the-loop simulations and will accelerate development of the most promising capabilities in cooperation with the FAA through the Efficient Flows Into Congested Airspace Research Transition Team.
Air Traffic Management Technology Demostration: 1 Research and Procedural Testing of Routes
NASA Technical Reports Server (NTRS)
Wilson, Sara R.; Kibler, Jennifer L.; Hubbs, Clay E.; Smail, James W.
2015-01-01
NASA's Air Traffic Management Technology Demonstration-1 (ATD-1) will operationally demonstrate the feasibility of efficient arrival operations combining ground-based and airborne NASA technologies. The ATD-1 integrated system consists of the Traffic Management Advisor with Terminal Metering which generates precise time-based schedules to the runway and merge points; Controller Managed Spacing decision support tools which provide controllers with speed advisories and other information needed to meet the schedule; and Flight deck-based Interval Management avionics and procedures which allow flight crews to adjust their speed to achieve precise relative spacing. Initial studies identified air-ground challenges related to the integration of these three scheduling and spacing technologies, and NASA's airborne spacing algorithm was modified to address some of these challenges. The Research and Procedural Testing of Routes human-in-the-loop experiment was then conducted to assess the performance of the new spacing algorithm. The results of this experiment indicate that the algorithm performed as designed, and the pilot participants found the airborne spacing concept, air-ground procedures, and crew interface to be acceptable. However, the researchers concluded that the data revealed issues with the frequency of speed changes and speed reversals.
Pathmanathan, Angela U; van As, Nicholas J; Kerkmeijer, Linda G W; Christodouleas, John; Lawton, Colleen A F; Vesprini, Danny; van der Heide, Uulke A; Frank, Steven J; Nill, Simeon; Oelfke, Uwe; van Herk, Marcel; Li, X Allen; Mittauer, Kathryn; Ritter, Mark; Choudhury, Ananya; Tree, Alison C
2018-02-01
Radiation therapy to the prostate involves increasingly sophisticated delivery techniques and changing fractionation schedules. With a low estimated α/β ratio, a larger dose per fraction would be beneficial, with moderate fractionation schedules rapidly becoming a standard of care. The integration of a magnetic resonance imaging (MRI) scanner and linear accelerator allows for accurate soft tissue tracking with the capacity to replan for the anatomy of the day. Extreme hypofractionation schedules become a possibility using the potentially automated steps of autosegmentation, MRI-only workflow, and real-time adaptive planning. The present report reviews the steps involved in hypofractionated adaptive MRI-guided prostate radiation therapy and addresses the challenges for implementation. Copyright © 2017 The Authors. Published by Elsevier Inc. All rights reserved.
29 CFR 1603.201 - Referral and scheduling for hearing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 4 2010-07-01 2010-07-01 false Referral and scheduling for hearing. 1603.201 Section 1603.201 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES FOR PREVIOUSLY EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION...
29 CFR 1603.201 - Referral and scheduling for hearing.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 4 2012-07-01 2012-07-01 false Referral and scheduling for hearing. 1603.201 Section 1603.201 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES FOR PREVIOUSLY EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION...
29 CFR 1603.201 - Referral and scheduling for hearing.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 4 2011-07-01 2011-07-01 false Referral and scheduling for hearing. 1603.201 Section 1603.201 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES FOR PREVIOUSLY EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION...
29 CFR 1603.201 - Referral and scheduling for hearing.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 4 2014-07-01 2014-07-01 false Referral and scheduling for hearing. 1603.201 Section 1603.201 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES FOR PREVIOUSLY EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION...
29 CFR 1603.201 - Referral and scheduling for hearing.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 4 2013-07-01 2013-07-01 false Referral and scheduling for hearing. 1603.201 Section 1603.201 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES FOR PREVIOUSLY EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION...
45 CFR 1801.52 - Payment schedule.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the Foundation...
45 CFR 1801.52 - Payment schedule.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the Foundation...
45 CFR 1801.52 - Payment schedule.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the Foundation...
45 CFR 1801.52 - Payment schedule.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the Foundation...
45 CFR 1801.52 - Payment schedule.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the Foundation...
State Regulation of Heliport Design
2001-05-01
Arpt Lgt Sked: Dusk-Dawn 81. Schedule for beacon; if lights on different from beacon list as a remark. If no beacon list light schedule. 82. Unicorn ...continued importance of hospital heliports and the rapidly growing use of instrument approach/departure procedures at such sites, is it appropriate
A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes.
Lee, I; Sikora, R; Shaw, M J
1997-01-01
Genetic algorithms (GAs) have been used widely for such combinatorial optimization problems as the traveling salesman problem (TSP), the quadratic assignment problem (QAP), and job shop scheduling. In all of these problems there is usually a well defined representation which GA's use to solve the problem. We present a novel approach for solving two related problems-lot sizing and sequencing-concurrently using GAs. The essence of our approach lies in the concept of using a unified representation for the information about both the lot sizes and the sequence and enabling GAs to evolve the chromosome by replacing primitive genes with good building blocks. In addition, a simulated annealing procedure is incorporated to further improve the performance. We evaluate the performance of applying the above approach to flexible flow line scheduling with variable lot sizes for an actual manufacturing facility, comparing it to such alternative approaches as pair wise exchange improvement, tabu search, and simulated annealing procedures. The results show the efficacy of this approach for flexible flow line scheduling.
Hidri, Lotfi; Gharbi, Anis; Louly, Mohamed Aly
2014-01-01
We focus on the two-center hybrid flow shop scheduling problem with identical parallel machines and removal times. The job removal time is the required duration to remove it from a machine after its processing. The objective is to minimize the maximum completion time (makespan). A heuristic and a lower bound are proposed for this NP-Hard problem. These procedures are based on the optimal solution of the parallel machine scheduling problem with release dates and delivery times. The heuristic is composed of two phases. The first one is a constructive phase in which an initial feasible solution is provided, while the second phase is an improvement one. Intensive computational experiments have been conducted to confirm the good performance of the proposed procedures.
Efficient Bounding Schemes for the Two-Center Hybrid Flow Shop Scheduling Problem with Removal Times
2014-01-01
We focus on the two-center hybrid flow shop scheduling problem with identical parallel machines and removal times. The job removal time is the required duration to remove it from a machine after its processing. The objective is to minimize the maximum completion time (makespan). A heuristic and a lower bound are proposed for this NP-Hard problem. These procedures are based on the optimal solution of the parallel machine scheduling problem with release dates and delivery times. The heuristic is composed of two phases. The first one is a constructive phase in which an initial feasible solution is provided, while the second phase is an improvement one. Intensive computational experiments have been conducted to confirm the good performance of the proposed procedures. PMID:25610911
Space network scheduling benchmark: A proof-of-concept process for technology transfer
NASA Technical Reports Server (NTRS)
Moe, Karen; Happell, Nadine; Hayden, B. J.; Barclay, Cathy
1993-01-01
This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.
Multifunctional Materials and Structures Gordon Research Conference
2016-03-08
accelerating transport or dynamic chemical changes in strong, stiff materials, optimizing interfaces between hard and soft materials, multi-physics...Forms; Discuss Future Site and Scheduling Preferences; Election of the Next Vice Chair 7:30 pm - 9:30 pm Actuation and Morphing Discussion Leader
Resource Allocation in a Repetitive Project Scheduling Using Genetic Algorithm
NASA Astrophysics Data System (ADS)
Samuel, Biju; Mathew, Jeeno
2018-03-01
Resource Allocation is procedure of doling out or allocating the accessible assets in a monetary way and productive way. Resource allocation is the scheduling of the accessible assets and accessible exercises or activities required while thinking about both the asset accessibility and the total project completion time. Asset provisioning and allocation takes care of that issue by permitting the specialist co-ops to deal with the assets for every individual demand of asset. A probabilistic selection procedure has been developed in order to ensure various selections of chromosomes
76 FR 18137 - Amendment of the Schedule of Application Fees
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... Section 309(j) of the Communications Act-- Competitive Bidding Procedures for Commercial Broadcast and... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 1 [GEN Docket No. 86-285; FCC 11-27] Amendment of the Schedule of Application Fees AGENCY: Federal Communications Commission. ACTION: Notice of proposed...
10 CFR 205.308 - Filing schedule and annual reports.
Code of Federal Regulations, 2010 CFR
2010-01-01
....308 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System... to Transmit Electric Energy to A Foreign Country § 205.308 Filing schedule and annual reports. (a) Persons authorized to transmit electric energy from the United States shall promptly file all supplements...
Conditioned Reinforcement Value and Resistance to Change
ERIC Educational Resources Information Center
Shahan, Timothy A.; Podlesnik, Christopher A.
2008-01-01
Three experiments examined the effects of conditioned reinforcement value and primary reinforcement rate on resistance to change using a multiple schedule of observing-response procedures with pigeons. In the absence of observing responses in both components, unsignaled periods of variable-interval (VI) schedule food reinforcement alternated with…
10 CFR 205.308 - Filing schedule and annual reports.
Code of Federal Regulations, 2011 CFR
2011-01-01
....308 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System... to Transmit Electric Energy to A Foreign Country § 205.308 Filing schedule and annual reports. (a) Persons authorized to transmit electric energy from the United States shall promptly file all supplements...
Dessole, Salvatore; Cosmi, Erich; Balata, Antonio; Uras, Luisa; Caserta, Donatella; Capobianco, Giampiero; Ambrosini, Guido
2004-11-01
The purpose of this study was to investigate the incidence, type, location, and risk factors of accidental fetal lacerations during cesarean delivery. Total deliveries, cesarean deliveries, and neonatal records for documented accidental fetal lacerations were reviewed retrospectively in our level III university hospital. The gestational age, the presenting part of the fetus, the cesarean delivery indication, the type of incision, and the surgeon who performed the procedure were recorded. Cesarean deliveries were divided into scheduled, unscheduled, and emergency procedures. Fetal lacerations were divided into mild, moderate, and severe. Neonatal follow-up examinations regarding laceration sequelae were available for 6 months. Of 14926 deliveries, 3108 women were delivered by cesarean birth (20.82%). Neonatal records documented 97 accidental fetal lacerations. Of these accidental lacerations, 94 were mild; 2 were moderate, and 1 was severe. The overall rate of accidental fetal laceration per cesarean delivery was 3.12%; the accidental laceration rate in the cohort of fetuses was 2.46%. The crude odds ratios were 0.34 for scheduled procedures, 0.57 for unscheduled procedures, and 1.7 for emergency procedures. The risk for fetal accidental lacerations was higher in fetuses who underwent emergency cesarean birth and lower for unscheduled and scheduled cesarean births (P < .001). Fetal accidental laceration may occur during cesarean delivery; the incidence is significantly higher during emergency cesarean delivery compared with elective procedures. The patient should be counseled about the occurrence of fetal laceration during cesarean delivery to avoid litigation.
Improving patient access to an interventional US clinic.
Steele, Joseph R; Clarke, Ryan K; Terrell, John A; Brightmon, Tonya R
2014-01-01
A continuous quality improvement project was conducted to increase patient access to a neurointerventional ultrasonography (US) clinic. The clinic was experiencing major scheduling delays because of an increasing patient volume. A multidisciplinary team was formed that included schedulers, medical assistants, nurses, technologists, and physicians. The team created an Ishikawa diagram of the possible causes of the long wait time to the next available appointment and developed a flowchart of the steps involved in scheduling and completing a diagnostic US examination and biopsy. The team then implemented a staged intervention that included adjustments to staffing and room use (stage 1); new procedures for scheduling same-day add-on appointments (stage 2); and a lead technician rotation to optimize patient flow, staffing, and workflow (stage 3). Six months after initiation of the intervention, the mean time to the next available appointment had decreased from 25 days at baseline to 1 day, and the number of available daily appointments had increased from 38 to 55. These improvements resulted from a coordinated provider effort and had a net present value of more than $275,000. This project demonstrates that structural changes in staffing, workflow, and room use can substantially reduce scheduling delays for critical imaging procedures. © RSNA, 2014.
Gallego-Delgado, María; Villacorta, Eduardo; Valenzuela-Vicente, M Carmen; Walias-Sánchez, Ángela; Ávila, Carmen; Velasco-Cañedo, M Jesús; Cano-Mozo, M Teresa; Martín-García, Agustín; García-Sánchez, María Jesús; Sánchez, Argelina; Cascón, Manuel; Sánchez, Pedro L
2018-05-21
The cardiology day hospital (CDH) is an alternative to hospitalization for scheduled cardiological procedures. The aims of this study were to analyze the activity, quality of care and the cost-effectiveness of a CDH. An observational descriptive study was conducted of the health care activity during the first year of operation of DHHA. The quality of care was analyzed through the substitution rate (outpatient procedures), cancellation rates, complications, and a satisfaction survey. For cost-effectiveness, we calculated the economic savings of avoided hospital stays. A total of 1646 patients were attended (mean age 69 ± 15 years, 60% men); 2550 procedures were scheduled with a cancellation rate of 4%. The most frequently cancelled procedure was electrical cardioversion. The substitution rate for scheduled invasive procedures was 66%. Only 1 patient required readmission after discharge from the CDH due to heart failure. Most surveyed patients (95%) considered the care received in the CDH to be good or very good. The saving due to outpatient-converted procedures made possible by the CDH was € 219 199.55, higher than the cost of the first year of operation. In our center, the CDH allowed more than two thirds of the invasive procedures to be performed on an outpatient basis, while maintaining the quality of care. In the first year of operation, the expenses due to its implementation were offset by a significant reduction in hospital admissions. Copyright © 2018 Sociedad Española de Cardiología. Published by Elsevier España, S.L.U. All rights reserved.
Waste Information Management System with 2012-13 Waste Streams - 13095
DOE Office of Scientific and Technical Information (OSTI.GOV)
Upadhyay, H.; Quintero, W.; Lagos, L.
2013-07-01
The Waste Information Management System (WIMS) 2012-13 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that wouldmore » be generated by DOE sites over the next 40 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)« less
A method for modeling aquatic toxicity date based on the theory of accelerated life testing and a procedure for maximum likelihood fitting the proposed model is presented. he procedure is computerized as software, which can predict chronic lethality of chemicals using data from a...
Bynum, T E; Koch, G G
1991-08-08
We sought to compare the efficacy of sucralfate to placebo for the prevention of duodenal ulcer recurrence and to determine that the efficacy of sucralfate was due to a true reduction in ulcer prevalence and not due to secondary effects such as analgesic activity or accelerated healing. This was a double-blind, randomized, placebo-controlled, parallel groups, multicenter clinical study with 254 patients. All patients had a past history of at least two duodenal ulcers with at least one ulcer diagnosed by endoscopic examination 3 months or less before the start of the study. Complete ulcer healing without erosions was required to enter the study. Sucralfate or placebo were dosed as a 1-g tablet twice a day for 4 months, or until ulcer recurrence. Endoscopic examinations once a month and when symptoms developed determined the presence or absence of duodenal ulcers. If a patient developed an ulcer between monthly scheduled visits, the patient was dosed with a 1-g sucralfate tablet twice a day until the next scheduled visit. Statistical analyses of the results determined the efficacy of sucralfate compared with placebo for preventing duodenal ulcer recurrence. Comparisons of therapeutic agents for preventing duodenal ulcers have usually been made by testing for statistical differences in the cumulative rates for all ulcers developed during a follow-up period, regardless of the time of detection. Statistical experts at the United States Food and Drug Administration (FDA) and on the FDA Advisory Panel expressed doubts about clinical study results based on this type of analysis. They suggested three possible mechanisms for reducing the number of observed ulcers: (a) analgesic effects, (b) accelerated healing, and (c) true ulcer prevention. Traditional ulcer analysis could miss recurring ulcers due to an analgesic effect or accelerated healing. Point-prevalence analysis could miss recurring ulcers due to accelerated healing between endoscopic examinations. Maximum ulcer analyses, a novel statistical method, eliminated analgesic effects by regularly scheduled endoscopies and accelerated healing of recurring ulcers by frequent endoscopies and an open-label phase. Maximum ulcer analysis reflects true ulcer recurrence and prevention. Sucralfate was significantly superior to placebo in reducing ulcer prevalence by all analyses. Significance (p less than 0.05) was found at months 3 and 4 for all analyses. All months were significant in the traditional analysis, months 2-4 in point-prevalence analysis, and months 3-4 in the maximal ulcer prevalence analysis. Sucralfate was shown to be effective for the prevention of duodenal ulcer recurrence by a true reduction in new ulcer development.
Pitch Guidance Optimization for the Orion Abort Flight Tests
NASA Technical Reports Server (NTRS)
Stillwater, Ryan Allanque
2010-01-01
The National Aeronautics and Space Administration created the Constellation program to develop the next generation of manned space vehicles and launch vehicles. The Orion abort system is initiated in the event of an unsafe condition during launch. The system has a controller gains schedule that can be tuned to reduce the attitude errors between the simulated Orion abort trajectories and the guidance trajectory. A program was created that uses the method of steepest descent to tune the pitch gains schedule by an automated procedure. The gains schedule optimization was applied to three potential abort scenarios; each scenario tested using the optimized gains schedule resulted in reduced attitude errors when compared to the Orion production gains schedule.
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2012 CFR
2012-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees... Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time required...
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2011 CFR
2011-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees.../Current Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time...
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2014 CFR
2014-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees... Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time required...
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2013 CFR
2013-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees... Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time required...
Project Physics Teacher Guide 3, The Triumph of Mechanics.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
Teaching procedures of Project Physics Unit 3 are presented to help teachers make effective use of learning materials. Unit contents are discussed in connection with teaching aid perspective, multi-media schedules, schedule blocks, and resource charts. Brief analyses are made for transparencies, 16mm films, and reader articles. Included is…
76 FR 67633 - Airworthiness Directives; Dassault Aviation Model Mystere-Falcon 50 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
...) of section 5-10 of the Recommended Maintenance Schedules chapter of the Aircraft Maintenance...) of section 5-10 of the Recommended Maintenance Schedules chapter of the Aircraft Maintenance... Dassault Falcon 50/ 50EX Maintenance Procedure 57-607, Non-Destructive Check of Flap Tracks 2 and 5, of...
40 CFR 86.215-94 - EPA urban dynamometer driving schedule.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 18 2011-07-01 2011-07-01 false EPA urban dynamometer driving schedule. 86.215-94 Section 86.215-94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... New Medium-Duty Passenger Vehicles; Cold Temperature Test Procedures § 86.215-94 EPA urban dynamometer...
Project Physics Teacher Guide 2, Motion in the Heavens.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
Teaching procedures of Project Physics Unit 2 are presented to help teachers make effective use of learning materials. The unit contents are discussed in connection with teaching aid perspectives, multi-media schedules, schedule blocks, and resource charts. Analyses are made for transparencies, 16mm films, and reader articles. Included is…
Project Physics Teacher Guide 6, The Nucleus.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
Teaching procedures of Project Physics Unit 6 are presented to help teachers make effective use of learning materials. Unit contents are discussed in connection with teaching aid lists, multi-media schedules, schedule blocks, and resource charts. Brief summaries are made for transparencies, 16mm films, and reader articles. Included is information…
CTEPP STANDARD OPERATING PROCEDURE FOR SETTING UP A HOUSEHOLD SAMPLING SCHEDULE (SOP-2.10)
This SOP describes the method for scheduling study subjects for field sampling activities in North Carolina (NC) and Ohio (OH). There are three field sampling teams with two staff members on each team. Two field sampling teams collect the field data simultaneously. A third fiel...
Do Conditional Reinforcers Count?
ERIC Educational Resources Information Center
Davison, Michael; Baum, William M.
2006-01-01
Six pigeons were trained on a procedure in which seven components arranged different food-delivery ratios on concurrent variable-interval schedules each session. The components were unsignaled, lasted for 10 food deliveries, and occurred in random order with a 60-s blackout between components. The schedules were arranged using a switching-key…
Project Physics Teacher Guide 4, Light and Electromagnetism.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
Teaching procedures of Project Physics Unit 4 are presented to help teachers make effective use of learning materials. Unit contents are discussed in connection with teaching aid lists, multi-media schedules, schedule blocks, and resources charts. Brief summaries are made for transparencies, 16mm films, and reader articles. Included is information…
46 CFR 282.31 - Subsidy billing procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... (a) Subsidy voucher—(1) Form. Requests for payment of ODS shall be submitted on a public voucher... affidavit. (1) The following schedules shall be used for calculating the amount of ODS payable: Schedule A (Company) ODSA No. ODS Accrued During Fiscal Year 198__ ODS Payable for the Month of Current voucher...
40 CFR 52.2720 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Emission limitation for one source in the Ponce Air Basin was submitted on March 26, 1976, by the... schedules submitted on March 13, 1974, by the Puerto Rico Environmental Quality Board. (13) Information on procedures followed in adoption of compliance schedules submitted on March 15, 1974, by the Puerto Rico...
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2010 CFR
2010-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees.../Current Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time...
19 CFR 122.154 - Notice of arrival.
Code of Federal Regulations, 2014 CFR
2014-04-01
... notice of arrival shall state: (1) Type of aircraft and registration number; (2) Name of aircraft... aircraft entering the U.S. from Cuba must give advance notice of arrival, unless it is an Office of Foreign Assets Control (OFAC) approved scheduled commercial aircraft of a scheduled airline. (b) Procedure for...
19 CFR 122.154 - Notice of arrival.
Code of Federal Regulations, 2012 CFR
2012-04-01
... notice of arrival shall state: (1) Type of aircraft and registration number; (2) Name of aircraft... aircraft entering the U.S. from Cuba must give advance notice of arrival, unless it is an Office of Foreign Assets Control (OFAC) approved scheduled commercial aircraft of a scheduled airline. (b) Procedure for...
19 CFR 122.154 - Notice of arrival.
Code of Federal Regulations, 2011 CFR
2011-04-01
... notice of arrival shall state: (1) Type of aircraft and registration number; (2) Name of aircraft... aircraft entering the U.S. from Cuba must give advance notice of arrival, unless it is an Office of Foreign Assets Control (OFAC) approved scheduled commercial aircraft of a scheduled airline. (b) Procedure for...
19 CFR 122.154 - Notice of arrival.
Code of Federal Regulations, 2013 CFR
2013-04-01
... notice of arrival shall state: (1) Type of aircraft and registration number; (2) Name of aircraft... aircraft entering the U.S. from Cuba must give advance notice of arrival, unless it is an Office of Foreign Assets Control (OFAC) approved scheduled commercial aircraft of a scheduled airline. (b) Procedure for...
1 CFR 17.4 - Procedure and timing for emergency publication.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 1 General Provisions 1 2010-01-01 2010-01-01 false Procedure and timing for emergency publication. 17.4 Section 17.4 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER PREPARATION... Schedule § 17.4 Procedure and timing for emergency publication. (a) Each agency requesting publication on...
ERIC Educational Resources Information Center
Repp, Charles A.; Brach, Ronald C.
The manual provides a rationale, procedural guidelines, time-schedules, instruments, and supporting documentation for student services program evaluation at SUNY Agricultural and Technical College, Delhi. Six procedural guidelines include: (1) all programs and services should be evaluated at least once every four years, with provision for annual…
76 FR 70664 - Policy Statement on Grant Stamp Procedure in Routine Director Orders
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-15
... grant stamp unopposed motions for an extension of time or requests for a procedural schedule to which..., Vice Chairman Begeman, and Commissioner Mulvey. Jeffrey Herzig, Clearance Clerk. Appendix [GRAPHIC...
STS-5 Fifth Space shuttle mission, first operational flight: Press Kit
NASA Technical Reports Server (NTRS)
1982-01-01
Schedules for the fifth Space Shuttle flight are provided. Launching procedure, extravehicular activity, contingency plans, satellite deployment, and onboard experiments are discussed. Landing procedures, tracking facilities, and crew data are provided.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ferdinand, Robin; Beauvais, Pierre-Yves
High Power Proton Accelerators (HPPAs) are studied for several projects based on high-flux neutron sources driven by proton or deuteron beams. Since the front end is considered as the most critical part of such accelerators, the two French national research agencies CEA and CNRS decided to collaborate in 1997 to study and build a High-Intensity Proton Injector (IPHI). The main objective of this project is to master the complex technologies used and the concepts of manufacturing and controlling the HPPAs. Recently, a collaboration agreement was signed with CERN and led to some evolutions in the design and in the schedule.more » The IPHI design current was maintained at 100 mA in Continuous Wave mode. This choice should allow to produce a high reliability beam at reduced intensity (typically 30 mA) tending to fulfill the Accelerator Driven System requirements. The output energy of the Radio Frequency Quadrupole (RFQ), was reduced from 5 to 3 MeV, allowing then the adjunction and the test, in pulsed operation of a chopper line developed by CERN for the Superconducting Proton Linac (SPL). In a final step, the IPHI RFQ and the chopper line should become parts of the SPL injector. In this paper, the IPHI project and the recent evolutions are reported together with the construction and operation schedule.« less
NASA Astrophysics Data System (ADS)
Torghabeh, A. A.; Tousi, A. M.
2007-08-01
This paper presents Fuzzy Logic and Neural Networks approach to Gas Turbine Fuel schedules. Modeling of non-linear system using feed forward artificial Neural Networks using data generated by a simulated gas turbine program is introduced. Two artificial Neural Networks are used , depicting the non-linear relationship between gas generator speed and fuel flow, and turbine inlet temperature and fuel flow respectively . Off-line fast simulations are used for engine controller design for turbojet engine based on repeated simulation. The Mamdani and Sugeno models are used to expression the Fuzzy system . The linguistic Fuzzy rules and membership functions are presents and a Fuzzy controller will be proposed to provide an Open-Loop control for the gas turbine engine during acceleration and deceleration . MATLAB Simulink was used to apply the Fuzzy Logic and Neural Networks analysis. Both systems were able to approximate functions characterizing the acceleration and deceleration schedules . Surge and Flame-out avoidance during acceleration and deceleration phases are then checked . Turbine Inlet Temperature also checked and controls by Neural Networks controller. This Fuzzy Logic and Neural Network Controllers output results are validated and evaluated by GSP software . The validation results are used to evaluate the generalization ability of these artificial Neural Networks and Fuzzy Logic controllers.
Waste information management system: a web-based system for DOE waste forecasting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Geisler, T.J.; Shoffner, P.A.; Upadhyay, U.
2007-07-01
The implementation of the Department of Energy (DOE) mandated accelerated cleanup program has created significant potential technical impediments that must be overcome. The schedule compression will require close coordination and a comprehensive review and prioritization of the barriers that may impede treatment and disposition of the waste streams at each site. Many issues related to site waste treatment and disposal have now become potential critical path issues under the accelerated schedules. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE headquarters in Washington, D.C., need timely waste forecast information regarding the volumes andmore » types of waste that will be generated by DOE sites over the next 25 years. Each local DOE site has historically collected, organized, and displayed site waste forecast information in separate and unique systems. However, waste information from all sites needs a common application to allow interested parties to understand and view the complete complex-wide picture. A common application would allow identification of total waste volumes, material classes, disposition sites, choke points, and technological or regulatory barriers to treatment and disposal. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, has completed the development of this web-based forecast system. (authors)« less
Jiang, Yuyi; Shao, Zhiqing; Guo, Yi
2014-01-01
A complex computing problem can be solved efficiently on a system with multiple computing nodes by dividing its implementation code into several parallel processing modules or tasks that can be formulated as directed acyclic graph (DAG) problems. The DAG jobs may be mapped to and scheduled on the computing nodes to minimize the total execution time. Searching an optimal DAG scheduling solution is considered to be NP-complete. This paper proposed a tuple molecular structure-based chemical reaction optimization (TMSCRO) method for DAG scheduling on heterogeneous computing systems, based on a very recently proposed metaheuristic method, chemical reaction optimization (CRO). Comparing with other CRO-based algorithms for DAG scheduling, the design of tuple reaction molecular structure and four elementary reaction operators of TMSCRO is more reasonable. TMSCRO also applies the concept of constrained critical paths (CCPs), constrained-critical-path directed acyclic graph (CCPDAG) and super molecule for accelerating convergence. In this paper, we have also conducted simulation experiments to verify the effectiveness and efficiency of TMSCRO upon a large set of randomly generated graphs and the graphs for real world problems. PMID:25143977
Jiang, Yuyi; Shao, Zhiqing; Guo, Yi
2014-01-01
A complex computing problem can be solved efficiently on a system with multiple computing nodes by dividing its implementation code into several parallel processing modules or tasks that can be formulated as directed acyclic graph (DAG) problems. The DAG jobs may be mapped to and scheduled on the computing nodes to minimize the total execution time. Searching an optimal DAG scheduling solution is considered to be NP-complete. This paper proposed a tuple molecular structure-based chemical reaction optimization (TMSCRO) method for DAG scheduling on heterogeneous computing systems, based on a very recently proposed metaheuristic method, chemical reaction optimization (CRO). Comparing with other CRO-based algorithms for DAG scheduling, the design of tuple reaction molecular structure and four elementary reaction operators of TMSCRO is more reasonable. TMSCRO also applies the concept of constrained critical paths (CCPs), constrained-critical-path directed acyclic graph (CCPDAG) and super molecule for accelerating convergence. In this paper, we have also conducted simulation experiments to verify the effectiveness and efficiency of TMSCRO upon a large set of randomly generated graphs and the graphs for real world problems.
Planning Risk-Based SQC Schedules for Bracketed Operation of Continuous Production Analyzers.
Westgard, James O; Bayat, Hassan; Westgard, Sten A
2018-02-01
To minimize patient risk, "bracketed" statistical quality control (SQC) is recommended in the new CLSI guidelines for SQC (C24-Ed4). Bracketed SQC requires that a QC event both precedes and follows (brackets) a group of patient samples. In optimizing a QC schedule, the frequency of QC or run size becomes an important planning consideration to maintain quality and also facilitate responsive reporting of results from continuous operation of high production analytic systems. Different plans for optimizing a bracketed SQC schedule were investigated on the basis of Parvin's model for patient risk and CLSI C24-Ed4's recommendations for establishing QC schedules. A Sigma-metric run size nomogram was used to evaluate different QC schedules for processes of different sigma performance. For high Sigma performance, an effective SQC approach is to employ a multistage QC procedure utilizing a "startup" design at the beginning of production and a "monitor" design periodically throughout production. Example QC schedules are illustrated for applications with measurement procedures having 6-σ, 5-σ, and 4-σ performance. Continuous production analyzers that demonstrate high σ performance can be effectively controlled with multistage SQC designs that employ a startup QC event followed by periodic monitoring or bracketing QC events. Such designs can be optimized to minimize the risk of harm to patients. © 2017 American Association for Clinical Chemistry.
Accelerated test plan for nickel cadmium spacecraft batteries
NASA Technical Reports Server (NTRS)
Hennigan, T. J.
1973-01-01
An accelerated test matrix is outlined that includes acceptance, baseline and post-cycling tests, chemical and physical analyses, and the data analysis procedures to be used in determining the feasibility of an accelerated test for sealed, nickel cadmium cells.
Stepaniak, Pieter S; Heij, Christiaan; Mannaerts, Guido H H; de Quelerij, Marcel; de Vries, Guus
2009-10-01
Gains in operating room (OR) scheduling may be obtained by using accurate statistical models to predict surgical and procedure times. The 3 main contributions of this article are the following: (i) the validation of Strum's results on the statistical distribution of case durations, including surgeon effects, using OR databases of 2 European hospitals, (ii) the use of expert prior expectations to predict durations of rarely observed cases, and (iii) the application of the proposed methods to predict case durations, with an analysis of the resulting increase in OR efficiency. We retrospectively reviewed all recorded surgical cases of 2 large European teaching hospitals from 2005 to 2008, involving 85,312 cases and 92,099 h in total. Surgical times tended to be skewed and bounded by some minimally required time. We compared the fit of the normal distribution with that of 2- and 3-parameter lognormal distributions for case durations of a range of Current Procedural Terminology (CPT)-anesthesia combinations, including possible surgeon effects. For cases with very few observations, we investigated whether supplementing the data information with surgeons' prior guesses helps to obtain better duration estimates. Finally, we used best fitting duration distributions to simulate the potential efficiency gains in OR scheduling. The 3-parameter lognormal distribution provides the best results for the case durations of CPT-anesthesia (surgeon) combinations, with an acceptable fit for almost 90% of the CPTs when segmented by the factor surgeon. The fit is best for surgical times and somewhat less for total procedure times. Surgeons' prior guesses are helpful for OR management to improve duration estimates of CPTs with very few (<10) observations. Compared with the standard way of case scheduling using the mean of the 3-parameter lognormal distribution for case scheduling reduces the mean overreserved OR time per case up to 11.9 (11.8-12.0) min (55.6%) and the mean underreserved OR time per case up to 16.7 (16.5-16.8) min (53.1%). When scheduling cases using the 4-parameter lognormal model the mean overutilized OR time is up to 20.0 (19.7-20.3) min per OR per day lower than for the standard method and 11.6 (11.3-12.0) min per OR per day lower as compared with the biased corrected mean. OR case scheduling can be improved by using the 3-parameter lognormal model with surgeon effects and by using surgeons' prior guesses for rarely observed CPTs. Using the 3-parameter lognormal model for case-duration prediction and scheduling significantly reduces both the prediction error and OR inefficiency.
Chemotherapy and treatment scheduling: the Johns Hopkins Oncology Center Outpatient Department.
Majidi, F.; Enterline, J. P.; Ashley, B.; Fowler, M. E.; Ogorzalek, L. L.; Gaudette, R.; Stuart, G. J.; Fulton, M.; Ettinger, D. S.
1993-01-01
The Chemotherapy and Treatment Scheduling System provides integrated appointment and facility scheduling for very complex procedures. It is fully integrated with other scheduling systems at The Johns Hopkins Oncology Center and is supported by the Oncology Clinical Information System (OCIS). It provides a combined visual and textual environment for the scheduling of events that have multiple dimensions and dependencies on other scheduled events. It is also fully integrated with other clinical decision support and ancillary systems within OCIS. The system has resulted in better patient flow through the ambulatory care areas of the Center. Implementing the system required changes in behavior among physicians, staff, and patients. This system provides a working example of building a sophisticated rule-based scheduling system using a relatively simple paradigm. It also is an example of what can be achieved when there is total integration between the operational and clinical components of patient care automation. PMID:8130453
Job Scheduling Under the Portable Batch System
NASA Technical Reports Server (NTRS)
Henderson, Robert L.; Woodrow, Thomas S. (Technical Monitor)
1995-01-01
The typical batch queuing system schedules jobs for execution by a set of queue controls. The controls determine from which queues jobs may be selected. Within the queue, jobs are ordered first-in, first-run. This limits the set of scheduling policies available to a site. The Portable Batch System removes this limitation by providing an external scheduling module. This separate program has full knowledge of the available queued jobs, running jobs, and system resource usage. Sites are able to implement any policy expressible in one of several procedural language. Policies may range from "bet fit" to "fair share" to purely political. Scheduling decisions can be made over the full set of jobs regardless of queue or order. The scheduling policy can be changed to fit a wide variety of computing environments and scheduling goals. This is demonstrated by the use of PBS on an IBM SP-2 system at NASA Ames.
An Example of Discovery Research Involving the Transfer of Stimulus Control
2005-01-01
The initial purpose of the present study was to replicate procedures for teaching preschool children to recruit attention at appropriate times by having an experimenter signal the availability and unavailability of attention (i.e., arrange a multiple schedule involving reinforcement and extinction; Tiger & Hanley, 2004). Following the development of discriminated social responding, the schedule-correlated stimuli were removed (i.e., a mixed schedule of reinforcement was arranged). However, discriminated responding continued during these conditions. Further evaluation suggested that stimulus control over children's social responding had transferred from the schedule-correlated stimuli to the delivery of reinforcement. The effect of a history of reinforcement under multiple-schedule conditions on performance under mixed schedules was then replicated with 2 participants in a reversal design. These findings suggest that following experience with schedule-correlated stimuli, these stimuli may be removed with only modest disruption to discriminated responding. PMID:16463530
ESSOPE: Towards S/C operations with reactive schedule planning
NASA Technical Reports Server (NTRS)
Wheadon, J.
1993-01-01
The ESSOPE is a prototype front-end tool running on a Sun workstation and interfacing to ESOC's MSSS spacecraft control system for the exchange of telecommand requests (to MSSS) and telemetry reports (from MSSS). ESSOPE combines an operations Planner-Scheduler, with a Schedule Execution Control function. Using an internal 'model' of the spacecraft, the Planner generates a schedule based on utilization requests for a variety of payload services by a community of Olympus users, and incorporating certain housekeeping operations. Conflicts based on operational constraints are automatically resolved, by employing one of several available strategies. The schedule is passed to the execution function which drives MSSS to perform it. When the schedule can no longer be met, either because the operator interferes (by delays or changes of requirements), or because ESSOPE has recognized some spacecraft anomalies, the Planner produces a modified schedule maintaining the on-going procedures as far as consistent with the new constraints or requirements.
Greven, Marcus; Wismeijer, Daniel
2017-01-01
PURPOSE To integrate extra-oral facial scanning information with CAD/CAM complete dentures to immediately rehabilitate terminal dentition. MATERIALS AND METHODS Ten patients with terminal dentition scheduled for total extraction and immediate denture placement were recruited for this study. The patients were submitted to a facial scanning procedure using the in-office PritiMirror scanner with bite registration records in-situ. Definitive stone cast models and bite records were subsequently submitted to a lab scanning procedure using the lab scanner (iSeries DWOS; Dental Wings). The scanned models were used to create a virtual teeth setup of a complete denture. Using the intra-oral bite records as a reference, the virtual setup was incorporated in the facial scan thereby facilitating a virtual clinical evaluation (teeth try-in) phase. After applying necessary adjustments, the virtual setup was submitted to a CAM procedure where a 5-axis industrial milling machine (M7 CNC; Darton AG General) was used to fabricate a full-milled PMMA immediate provisional prosthesis. RESULTS Total extractions were performed, the dentures were immediately inserted, and subjective clinical fit was evaluated. The immediate provisional prostheses were inserted and clinical fit, occlusion/articulation, and esthetics were subjectively assessed; the results were deemed satisfactory. All provisional prostheses remained three months in function with no notable technical complications. CONCLUSION Ten patients with terminal dentition were treated using a complete digital approach to fabricate complete dentures using CAD/CAM technology. The proposed technique has the potential to accelerate the rehabilitation procedure starting from immediate denture to final implant-supported prosthesis leading to more predictable functional and aesthetics outcomes. PMID:29142646
48 CFR 252.217-7001 - Surge option.
Code of Federal Regulations, 2012 CFR
2012-10-01
... sustainable rate of delivery for items in this contract. This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing... than the maximum sustainable delivery rate under paragraph (b)(2) of this clause, nor will the exercise...
48 CFR 252.217-7001 - Surge option.
Code of Federal Regulations, 2013 CFR
2013-10-01
... sustainable rate of delivery for items in this contract. This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing... than the maximum sustainable delivery rate under paragraph (b)(2) of this clause, nor will the exercise...
48 CFR 252.217-7001 - Surge option.
Code of Federal Regulations, 2014 CFR
2014-10-01
... sustainable rate of delivery for items in this contract. This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing... than the maximum sustainable delivery rate under paragraph (b)(2) of this clause, nor will the exercise...
48 CFR 252.217-7001 - Surge option.
Code of Federal Regulations, 2011 CFR
2011-10-01
... sustainable rate of delivery for items in this contract. This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing... than the maximum sustainable delivery rate under paragraph (b)(2) of this clause, nor will the exercise...
Budach, W; Hehr, T; Budach, V; Belka, C; Dietz, K
2006-01-01
Background Former meta-analyses have shown a survival benefit for the addition of chemotherapy (CHX) to radiotherapy (RT) and to some extent also for the use of hyperfractionated radiation therapy (HFRT) and accelerated radiation therapy (AFRT) in locally advanced squamous cell carcinoma (SCC) of the head and neck. However, the publication of new studies and the fact that many older studies that were included in these former meta-analyses used obsolete radiation doses, CHX schedules or study designs prompted us to carry out a new analysis using strict inclusion criteria. Methods Randomised trials testing curatively intended RT (≥60 Gy in >4 weeks/>50 Gy in <4 weeks) on SCC of the oral cavity, oropharynx, hypopharynx, and larynx published as full paper or in abstract form between 1975 and 2003 were eligible. Trials comparing RT alone with concurrent or alternating chemoradiation (5-fluorouracil (5-FU), cisplatin, carboplatin, mitomycin C) were analyzed according to the employed radiation schedule and the used CHX regimen. Studies comparing conventionally fractionated radiotherapy (CFRT) with either HFRT or AFRT without CHX were separately examined. End point of the meta-analysis was overall survival. Results Thirty-two trials with a total of 10 225 patients were included into the meta-analysis. An overall survival benefit of 12.0 months was observed for the addition of simultaneous CHX to either CFRT or HFRT/AFRT (p < 0.001). Separate analyses by cytostatic drug indicate a prolongation of survival of 24.0 months, 16.8 months, 6.7 months, and 4.0 months, respectively, for the simultaneous administration of 5-FU, cisplatin-based, carboplatin-based, and mitomycin C-based CHX to RT (each p < 0.01). Whereas no significant gain in overall survival was observed for AFRT in comparison to CFRT, a substantial prolongation of median survival (14.2 months, p < 0.001) was seen for HFRT compared to CFRT (both without CHX). Conclusion RT combined with simultaneous 5-FU, cisplatin, carboplatin, and mitomycin C as single drug or combinations of 5-FU with one of the other drugs results in a large survival advantage irrespective the employed radiation schedule. If radiation therapy is used as single modality, hyperfractionation leads to a significant improvement of overall survival. Accelerated radiation therapy alone, especially when given as split course radiation schedule or extremely accelerated treatments with decreased total dose, does not increase overall survival. PMID:16448551
A Novel Method for Vertical Acceleration Noise Suppression of a Thrust-Vectored VTOL UAV.
Li, Huanyu; Wu, Linfeng; Li, Yingjie; Li, Chunwen; Li, Hangyu
2016-12-02
Acceleration is of great importance in motion control for unmanned aerial vehicles (UAVs), especially during the takeoff and landing stages. However, the measured acceleration is inevitably polluted by severe noise. Therefore, a proper noise suppression procedure is required. This paper presents a novel method to reduce the noise in the measured vertical acceleration for a thrust-vectored tail-sitter vertical takeoff and landing (VTOL) UAV. In the new procedure, a Kalman filter is first applied to estimate the UAV mass by using the information in the vertical thrust and measured acceleration. The UAV mass is then used to compute an estimate of UAV vertical acceleration. The estimated acceleration is finally fused with the measured acceleration to obtain the minimum variance estimate of vertical acceleration. By doing this, the new approach incorporates the thrust information into the acceleration estimate. The method is applied to the data measured in a VTOL UAV takeoff experiment. Two other denoising approaches developed by former researchers are also tested for comparison. The results demonstrate that the new method is able to suppress the acceleration noise substantially. It also maintains the real-time performance in the final estimated acceleration, which is not seen in the former denoising approaches. The acceleration treated with the new method can be readily used in the motion control applications for UAVs to achieve improved accuracy.
A Novel Method for Vertical Acceleration Noise Suppression of a Thrust-Vectored VTOL UAV
Li, Huanyu; Wu, Linfeng; Li, Yingjie; Li, Chunwen; Li, Hangyu
2016-01-01
Acceleration is of great importance in motion control for unmanned aerial vehicles (UAVs), especially during the takeoff and landing stages. However, the measured acceleration is inevitably polluted by severe noise. Therefore, a proper noise suppression procedure is required. This paper presents a novel method to reduce the noise in the measured vertical acceleration for a thrust-vectored tail-sitter vertical takeoff and landing (VTOL) UAV. In the new procedure, a Kalman filter is first applied to estimate the UAV mass by using the information in the vertical thrust and measured acceleration. The UAV mass is then used to compute an estimate of UAV vertical acceleration. The estimated acceleration is finally fused with the measured acceleration to obtain the minimum variance estimate of vertical acceleration. By doing this, the new approach incorporates the thrust information into the acceleration estimate. The method is applied to the data measured in a VTOL UAV takeoff experiment. Two other denoising approaches developed by former researchers are also tested for comparison. The results demonstrate that the new method is able to suppress the acceleration noise substantially. It also maintains the real-time performance in the final estimated acceleration, which is not seen in the former denoising approaches. The acceleration treated with the new method can be readily used in the motion control applications for UAVs to achieve improved accuracy. PMID:27918422
DOT National Transportation Integrated Search
2014-11-15
The simplified procedure in design codes for determining earthquake response spectra involves : estimating site coefficients to adjust available rock accelerations to site accelerations. Several : investigators have noted concerns with the site coeff...
Project Physics Teacher Guide 5, Models of the Atom.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
Teaching procedures of Project Physics Unit 5 are presented to help teachers make effective use of learning materials. Unit contents are discussed in connection with teaching aid lists, multi-media schedules, schedule blocks, and resource charts. Brief summaries are made for transparencies, 16mm films, and reader articles. Included is information…
Human Schedule Performance, Protocol Analysis, and the "Silent Dog" Methodology
ERIC Educational Resources Information Center
Cabello, Francisco; Luciano, Carmen; Gomez, Inmaculada; Barnes-Holmes, Dermot
2004-01-01
The purpose of the current experiment was to investigate the role of private verbal behavior on the operant performances of human adults, using a protocol analysis procedure with additional methodological controls (the "silent dog" method). Twelve subjects were exposed to fixed ratio 8 and differential reinforcement of low rate 3-s schedules. For…
Course Scheduling to Find the Minimum Cost Set of Facilities Required.
ERIC Educational Resources Information Center
Seccatore, Luis A.
The problem of determining the quantity of classroom, laboratories and instructors to train sections of students attending numerous distinct courses in a school such as the Fleet Ballistic Missile School is considered. A procedure is developed for determining feasible schedules in order to graduate a fixed number of trainees over time while…
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 32 2011-07-01 2011-07-01 false Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 33 2012-07-01 2012-07-01 false Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 33 2013-07-01 2013-07-01 false Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 32 2014-07-01 2014-07-01 false Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
10 CFR 2.1322 - Participation and schedule for submissions in an oral hearing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Participation and schedule for submissions in an oral hearing. 2.1322 Section 2.1322 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer Applications § 2...
10 CFR 2.1322 - Participation and schedule for submissions in an oral hearing.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Participation and schedule for submissions in an oral hearing. 2.1322 Section 2.1322 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer Applications § 2...
ERIC Educational Resources Information Center
Falcomata, Terry S.; Muething, Colin S.; Gainey, Summer; Hoffman, Katherine; Fragale, Christina
2013-01-01
We evaluated functional communication training (FCT) combined with a chained schedule of reinforcement procedure for the treatment of challenging behavior exhibited by two individuals diagnosed with Asperger syndrome and autism. Following functional analyses that suggested that challenging behavior served multiple functions for both participants,…
14 CFR 91.1029 - Flight scheduling and locating requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... program manager must establish and use an adequate system to schedule and release program aircraft. (b) Except as provided in paragraph (d) of this section, each program manager must have adequate procedures... manager with at least the information required to be included in a VFR flight plan; (2) Provide for timely...
Discriminated Timeout Avoidance in Pigeons: The Roles of Added Stimuli
ERIC Educational Resources Information Center
DeFulio, Anthony; Hackenberg, Timothy D.
2007-01-01
Two experiments examined pigeons' postponement of a signaled extinction period, or timeout (TO), from an ongoing schedule of response-dependent food delivery. A concurrent-operant procedure was used in which responses on one (food) key produced food according to a variable-interval schedule and responses on a second (postponement) key delayed the…
46 CFR 252.41 - Subsidy billing procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for payment of ODS shall be submitted on a public voucher, Standard Forms 1034 and 1034A, which can be... schedules shall be used for calculating the amount of ODS payable: Schedule A (Company) ODSA No. ODS Accrued During Fiscal Year 19__ ODS Payable for the Month of Current voucher Previous voucher Total Total accrued...
Preference for locus of punishment in a response sequence.
NASA Technical Reports Server (NTRS)
Dardano, J. F.
1972-01-01
Study of differences in the aversiveness of response-dependent shock when scheduled on the first, middle or final response of a sequence of 70 responses of food-deprived pigeons, using a procedure to identify relative preferences. The preferred shock schedule and the strength of the preference were found to vary among the pigeons.
Capriotti, Matthew R; Turkel, Jennifer E; Johnson, Rachel A; Espil, Flint M; Woods, Douglas W
2017-01-01
Chronic tic disorders (CTDs) involve motor and/or vocal tics that often cause substantial distress and impairment. Differential reinforcement of other behavior (DRO) schedules of reinforcement produce robust, but incomplete, reductions in tic frequency in youth with CTDs; however, a more robust reduction may be needed to affect durable clinical change. Standard, fixed-amount DRO schedules have not commonly yielded such reductions, so we evaluated a novel, progressive-amount DRO schedule, based on its ability to facilitate sustained abstinence from functionally similar behaviors. Five youth with CTDs were exposed to periods of baseline, fixed-amount DRO (DRO-F), and progressive-amount DRO (DRO-P). Both DRO schedules produced decreases in tic rate and increases in intertic interval duration, but no systematic differences were seen between the two schedules on any dimension of tic occurrence. The DRO-F schedule was generally preferred to the DRO-P schedule. Possible procedural improvements and other future directions are discussed. © 2016 Society for the Experimental Analysis of Behavior.
SLS-PLAN-IT: A knowledge-based blackboard scheduling system for Spacelab life sciences missions
NASA Technical Reports Server (NTRS)
Kao, Cheng-Yan; Lee, Seok-Hua
1992-01-01
The primary scheduling tool in use during the Spacelab Life Science (SLS-1) planning phase was the operations research (OR) based, tabular form Experiment Scheduling System (ESS) developed by NASA Marshall. PLAN-IT is an artificial intelligence based interactive graphic timeline editor for ESS developed by JPL. The PLAN-IT software was enhanced for use in the scheduling of Spacelab experiments to support the SLS missions. The enhanced software SLS-PLAN-IT System was used to support the real-time reactive scheduling task during the SLS-1 mission. SLS-PLAN-IT is a frame-based blackboard scheduling shell which, from scheduling input, creates resource-requiring event duration objects and resource-usage duration objects. The blackboard structure is to keep track of the effects of event duration objects on the resource usage objects. Various scheduling heuristics are coded in procedural form and can be invoked any time at the user's request. The system architecture is described along with what has been learned with the SLS-PLAN-IT project.
MacDuff, G S; Krantz, P J; McClannahan, L E
1993-01-01
We used a graduated guidance procedure to teach 4 boys with autism to follow photographic activity schedules to increase on-task and on-schedule behavior. The multiple baseline across participants design included baseline, teaching, maintenance, resequencing of photographs, and generalization to novel photographs phases. The results indicated that photographic activity schedules (albums depicting after-school activities) produced sustained engagement, and skills generalized to a new sequence of photographs and to new photographs. The acquisition of schedule-following skills enabled these children with severe developmental disabilities to display lengthy response chains, independently change activities, and change activities in different group home settings in the absence of immediate supervision and prompts from others. PMID:8473261
Xing, KeYi; Han, LiBin; Zhou, MengChu; Wang, Feng
2012-06-01
Deadlock-free control and scheduling are vital for optimizing the performance of automated manufacturing systems (AMSs) with shared resources and route flexibility. Based on the Petri net models of AMSs, this paper embeds the optimal deadlock avoidance policy into the genetic algorithm and develops a novel deadlock-free genetic scheduling algorithm for AMSs. A possible solution of the scheduling problem is coded as a chromosome representation that is a permutation with repetition of parts. By using the one-step look-ahead method in the optimal deadlock control policy, the feasibility of a chromosome is checked, and infeasible chromosomes are amended into feasible ones, which can be easily decoded into a feasible deadlock-free schedule. The chromosome representation and polynomial complexity of checking and amending procedures together support the cooperative aspect of genetic search for scheduling problems strongly.
Geurts, Sofie; van der Werf, Sieberen P.; Kessels, Roy P. C.
2015-01-01
The main focus of this review was to evaluate whether long-term forgetting rates (delayed tests, days, to weeks, after initial learning) are more sensitive measures than standard delayed recall measures to detect memory problems in various patient groups. It has been suggested that accelerated forgetting might be characteristic for epilepsy patients, but little research has been performed in other populations. Here, we identified eleven studies in a wide range of brain injured patient groups, whose long-term forgetting patterns were compared to those of healthy controls. Signs of accelerated forgetting were found in three studies. The results of eight studies showed normal forgetting over time for the patient groups. However, most of the studies used only a recognition procedure, after optimizing initial learning. Based on these results, we recommend the use of a combined recall and recognition procedure to examine accelerated forgetting and we discuss the relevance of standard and optimized learning procedures in clinical practice. PMID:26106343
Fermi National Accelerator Laboratory Annual Program Review 1991
DOE Office of Scientific and Technical Information (OSTI.GOV)
Appel, Jeffrey A.; Jovanovic, Drasko; Pordes, Stephen
1991-01-01
This book is submitted as a written adjunct to the Annual DOE High Energy Physics Program Review of Fermilab, scheduled this year for April 10-12, 1991. In it are described the functions and activities of the various Laboratory areas plus statements of plans and goals for the coming year.
26 CFR 1.409A-3 - Permissible payments.
Code of Federal Regulations, 2010 CFR
2010-04-01
... schedule of periodic payments on a dollar-for-dollar basis by the amount of bona fide disability pay..., objective formula limitation, if the disability payments are made pursuant to a plan sponsored by the... other change in the benefit payable under, such bona fide disability plan results in an acceleration of...
Job Shop Scheduling Focusing on Role of Buffer
NASA Astrophysics Data System (ADS)
Hino, Rei; Kusumi, Tetsuya; Yoo, Jae-Kyu; Shimizu, Yoshiaki
A scheduling problem is formulated in order to consistently manage each manufacturing resource, including machine tools, assembly robots, AGV, storehouses, material shelves, and so on. The manufacturing resources are classified into three types: producer, location, and mover. This paper focuses especially on the role of the buffer, and the differences among these types are analyzed. A unified scheduling formulation is derived from the analytical results based on the resource’s roles. Scheduling procedures based on dispatching rules are also proposed in order to numerically evaluate job shop-type production having finite buffer capacity. The influences of the capacity of bottle-necked production devices and the buffer on productivity are discussed.
Landa, Robin; Hanley, Gregory P
2016-06-01
Using procedures similar to those of Tiger, Hanley, and Heal (2006), we compared two multiple-schedule variations (S+/S- and S+ only) to treat high-rate requests for edible items in the Picture Exchange Communication System (PECS). Two individuals with autism participated, after they showed persistent requests for edible items after PECS training. Stimulus control was achieved only with the multiple schedule that involved presentation of a discriminative stimulus during reinforcement components and its removal during extinction components (S+ only). Discriminated requests were maintained for the 1 participant who experienced schedule thinning. © 2016 Society for the Experimental Analysis of Behavior.
NASA Technical Reports Server (NTRS)
Callantine, Todd J.; Cabrall, Christopher; Kupfer, Michael; Omar, Faisal G.; Prevot, Thomas
2012-01-01
NASA?s Air Traffic Management Demonstration-1 (ATD-1) is a multi-year effort to demonstrate high-throughput, fuel-efficient arrivals at a major U.S. airport using NASA-developed scheduling automation, controller decision-support tools, and ADS-B-enabled Flight-Deck Interval Management (FIM) avionics. First-year accomplishments include the development of a concept of operations for managing scheduled arrivals flying Optimized Profile Descents with equipped aircraft conducting FIM operations, and the integration of laboratory prototypes of the core ATD-1 technologies. Following each integration phase, a human-in-the-loop simulation was conducted to evaluate and refine controller tools, procedures, and clearance phraseology. From a ground-side perspective, the results indicate the concept is viable and the operations are safe and acceptable. Additional training is required for smooth operations that yield notable benefits, particularly in the areas of FIM operations and clearance phraseology.
1997-05-01
KENNEDY SPACE CENTER, FLA. -- KSC payloads processing employees work to reservice the Microgravity Science Laboratory-1 (MSL-1) Spacelab module in the Space Shuttle Orbiter Columbia’s payload bay for the STS-94 mission in Orbiter Processing Facility 1. That mission is now scheduled to lift off in early July. This was the first time that this type of payload was reserviced without removing it from the payload bay. This new procedure pioneers processing efforts for quick relaunch turnaround times for future payloads. The Spacelab module was scheduled to fly again with the full complement of STS-83 experiments after that mission was cut short due to a faulty fuel cell. During the scheduled 16-day STS-94 mission, the experiments will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the flight crew conducts combustion, protein crystal growth and materials processing experiments
1997-05-01
KENNEDY SPACE CENTER, FLA. -- KSC payloads processing employees work to reservice the Microgravity Science Laboratory-1 (MSL-1) Spacelab module in the Space Shuttle Orbiter Columbia’s payload bay for the STS-94 mission in Orbiter Processing Facility 1. That mission is now scheduled to lift off in early July. This was the first time that this type of payload was reserviced without removing it from the payload bay. This new procedure pioneers processing efforts for quick relaunch turnaround times for future payloads. The Spacelab module was scheduled to fly again with the full complement of STS-83 experiments after that mission was cut short due to a faulty fuel cell. During the scheduled 16-day STS-94 mission, the experiments will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the flight crew conducts combustion, protein crystal growth and materials processing experiments
1997-05-01
KSC payloads processing employees work to reservice the Microgravity Science Laboratory-1 (MSL-1) Spacelab module in the Space Shuttle Orbiter Columbia’s payload bay for the STS-94 mission in Orbiter Processing Facility 1. That mission is now scheduled to lift off in early July. This was the first time that this type of payload was reserviced without removing it from the payload bay. This new procedure pioneers processing efforts for quick relaunch turnaround times for future payloads. The Spacelab module was scheduled to fly again with the full complement of STS-83 experiments after that mission was cut short due to a faulty fuel cell. During the scheduled 16-day STS-94 mission, the experiments will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the flight crew conducts combustion, protein crystal growth and materials processing experiments
MacDonall, James S
2017-09-01
Some have reported changing the schedule at one alternative of a concurrent schedule changed responding at the other alternative (Catania, 1969), which seems odd because no contingencies were changed there. When concurrent schedules are programmed using two schedules, one associated with each alternative that operate continuously, changing the schedule at one alternative also changes the switch schedule at the other alternative. Thus, changes in responding at the constant alternative could be due to the change in the switch schedule. To assess this possibility, six rats were exposed to a series of conditions that alternated between pairs of interval schedules at both alternatives and a pair of interval schedules at one, constant, alternative and a pair of extinction schedules at the other alternative. Comparing run lengths, visit durations and response rates at the constant alternative in the alternating conditions did not show consistent increases and decreases when a strict criterion for changes was used. Using a less stringent definition (any change in mean values) showed changes. The stay/switch analysis suggests it may be inaccurate to apply behavioral contrast to procedures that change from concurrent variable-interval variable-interval schedules to concurrent variable-interval extinction schedules because the contingencies in neither alternative are constant. © 2017 Society for the Experimental Analysis of Behavior.
Solving a Production Scheduling Problem by Means of Two Biobjective Metaheuristic Procedures
NASA Astrophysics Data System (ADS)
Toncovich, Adrián; Oliveros Colay, María José; Moreno, José María; Corral, Jiménez; Corral, Rafael
2009-11-01
Production planning and scheduling problems emphasize the need for the availability of management tools that can help to assure proper service levels to customers, maintaining, at the same time, the production costs at acceptable levels and maximizing the utilization of the production facilities. In this case, a production scheduling problem that arises in the context of the activities of a company dedicated to the manufacturing of furniture for children and teenagers is addressed. Two bicriteria metaheuristic procedures are proposed to solve the sequencing problem in a production equipment that constitutes the bottleneck of the production process of the company. The production scheduling problem can be characterized as a general flow shop with sequence dependant setup times and additional inventory constraints. Two objectives are simultaneously taken into account when the quality of the candidate solutions is evaluated: the minimization of completion time of all jobs, or makespan, and the minimization of the total flow time of all jobs. Both procedures are based on a local search strategy that responds to the structure of the simulated annealing metaheuristic. In this case, both metaheuristic approaches generate a set of solutions that provides an approximation to the optimal Pareto front. In order to evaluate the performance of the proposed techniques a series of experiments was conducted. After analyzing the results, it can be said that the solutions provided by both approaches are adequate from the viewpoint of the quality as well as the computational effort involved in their generation. Nevertheless, a further refinement of the proposed procedures should be implemented with the aim of facilitating a quasi-automatic definition of the solution parameters.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nuyts, Sandra; Dirix, Piet; Clement, Paul M.J.
2009-03-15
Purpose: To evaluate the feasibility and efficacy of a hyperfractionated accelerated radiotherapy (RT) schedule combined with concomitant chemotherapy (Cx) in patients with locally advanced head-and-neck squamous cell carcinoma. Methods and Materials: Between 2004 and 2007, a total of 90 patients with locoregionally advanced head-and-neck squamous cell carcinoma underwent irradiation according to a hybrid fractionation schedule consisting of 20 fractions of 2 Gy (once daily) followed by 20 fractions of 1.6 Gy (twice daily) to a total dose of 72 Gy. Concomitant Cx (cisplatinum 100 mg/m{sup 2}) was administered at the start of Weeks 1 and 4. Treatment outcome and toxicitymore » were retrospectively compared with a previous patient group (n = 73) treated with the same schedule, but without concomitant Cx, between 2001 and 2004. Results: The locoregional control (LRC) rate was 70% after 2 years. Two-year overall and 2-year disease-free survival rates were 74% and 60%, respectively. In comparison with the RT-only group, an improvement of 15% in both LRC (p = 0.03) and overall survival (p = 0.09) was observed. All patients were treated to full radiation dose according to protocol, although the Cx schedule had to be adjusted in 12 patients. No acute Grade 4 or 5 toxicity was seen, but incidences of Grade 3 acute mucositis (74.5% vs. 50.7%; p = 0.002) and dysphagia (82.2% vs. 47.9%; p < 0.001) were significantly higher in the chemoradiotherapy group compared with patients treated with RT alone. Conclusion: With this chemoradiotherapy regimen, excellent LRC and survival rates were achieved, with acceptable acute toxicity.« less
Online stochastic optimization of radiotherapy patient scheduling.
Legrain, Antoine; Fortin, Marie-Andrée; Lahrichi, Nadia; Rousseau, Louis-Martin
2015-06-01
The effective management of a cancer treatment facility for radiation therapy depends mainly on optimizing the use of the linear accelerators. In this project, we schedule patients on these machines taking into account their priority for treatment, the maximum waiting time before the first treatment, and the treatment duration. We collaborate with the Centre Intégré de Cancérologie de Laval to determine the best scheduling policy. Furthermore, we integrate the uncertainty related to the arrival of patients at the center. We develop a hybrid method combining stochastic optimization and online optimization to better meet the needs of central planning. We use information on the future arrivals of patients to provide an accurate picture of the expected utilization of resources. Results based on real data show that our method outperforms the policies typically used in treatment centers.
Amphetamine increases schedule-induced drinking reduced by negative punishment procedures.
Pérez-Padilla, Angeles; Pellón, Ricardo
2003-05-01
d-Amphetamine has been reported to increase schedule-induced drinking punished by lick-dependent signalled delays in food delivery. This might reflect a drug-behaviour interaction dependent on the type of punisher, because no such effect has been found when drinking was reduced by lick-contingent electric shocks. However, the anti-punishment effect of amphetamine could be mediated by other behavioural processes, such as a loss of discriminative control or an increase in the value of delayed reinforcers. To test the effects of d-amphetamine on the acquisition and maintenance of schedule-induced drinking reduced by unsignalled delays in food delivery. Rats received 10-s unsignalled delays initiated by each lick after polydipsia was induced by a fixed-time 30-s food reinforcement schedule or from the outset of the experiment. Yoked-control rats received these same delays but independently of their own behaviour. d-Amphetamine (0.1-3.0 mg/kg) was then tested IP. d-Amphetamine dose-dependently increased and then decreased punished schedule-induced drinking. The drug led to dose-dependent reductions when the delays were not contingent or when they were applied from the outset of training. These results support the contention that d-amphetamine has an increasing effect on schedule-induced drinking that has been previously reduced by a negative punishment procedure. This effect cannot be attributed to other potentially involved processes, and therefore support the idea that drug effects on punished behaviour depend on punishment being delays in food or shock deliveries.
30 CFR 56.19062 - Maximum acceleration and deceleration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Maximum acceleration and deceleration. 56.19062 Section 56.19062 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Hoisting Hoisting Procedures § 56.19062 Maximum acceleration and deceleration. Maximum normal operating...
30 CFR 57.19062 - Maximum acceleration and deceleration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Maximum acceleration and deceleration. 57.19062 Section 57.19062 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Hoisting Hoisting Procedures § 57.19062 Maximum acceleration and deceleration. Maximum normal operating...
Accelerated stress testing of terrestrial solar cells
NASA Technical Reports Server (NTRS)
Prince, J. L.; Lathrop, J. W.
1979-01-01
A program to investigate the reliability characteristics of unencapsulated low-cost terrestrial solar cells using accelerated stress testing is described. Reliability (or parametric degradation) factors appropriate to the cell technologies and use conditions were studied and a series of accelerated stress tests was synthesized. An electrical measurement procedure and a data analysis and management system was derived, and stress test fixturing and material flow procedures were set up after consideration was given to the number of cells to be stress tested and measured and the nature of the information to be obtained from the process. Selected results and conclusions are presented.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Changes in rate... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Procedures for Changing Tariffs § 154.204 Changes...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Changes in rate... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Procedures for Changing Tariffs § 154.204 Changes...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Changes in rate... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Procedures for Changing Tariffs § 154.204 Changes...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Changes in rate... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Procedures for Changing Tariffs § 154.204 Changes...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Changes in rate... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Procedures for Changing Tariffs § 154.204 Changes...
ERIC Educational Resources Information Center
Jimenez-Gomez, Corina; Shahan, Timothy A.
2012-01-01
An extensive body of research using concurrent-chains schedules of reinforcement has shown that choice for one of two differentially valued food-associated stimuli is dependent upon the overall temporal context in which those stimuli are embedded. The present experiments examined whether the concurrent chains procedure was useful for the study of…
47 CFR 1.1152 - Schedule of annual regulatory fees and filing locations for wireless radio services.
Code of Federal Regulations, 2014 CFR
2014-10-01
... locations for wireless radio services. 1.1152 Section 1.1152 Telecommunication FEDERAL COMMUNICATIONS... Procedures for Payment § 1.1152 Schedule of annual regulatory fees and filing locations for wireless radio..., St. Louis, MO 63197-9000. General Mobile Radio Service (a) New, Renew/Mod (FCC 605 & 159) 5.00 FCC, P...
47 CFR 1.1152 - Schedule of annual regulatory fees and filing locations for wireless radio services.
Code of Federal Regulations, 2012 CFR
2012-10-01
... locations for wireless radio services. 1.1152 Section 1.1152 Telecommunication FEDERAL COMMUNICATIONS... Procedures for Payment § 1.1152 Schedule of annual regulatory fees and filing locations for wireless radio..., P.O. Box 979097, St. Louis, MO 63197-9000. General Mobile Radio Service: (a) New, Renew/Mod (FCC 605...
47 CFR 1.1152 - Schedule of annual regulatory fees and filing locations for wireless radio services.
Code of Federal Regulations, 2013 CFR
2013-10-01
... locations for wireless radio services. 1.1152 Section 1.1152 Telecommunication FEDERAL COMMUNICATIONS... Procedures for Payment § 1.1152 Schedule of annual regulatory fees and filing locations for wireless radio..., P.O. Box 979097, St. Louis, MO 63197-9000. General Mobile Radio Service (a) New, Renew/Mod (FCC 605...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Participation and schedule for submission in a hearing consisting of written comments. 2.1321 Section 2.1321 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Participation and schedule for submission in a hearing consisting of written comments. 2.1321 Section 2.1321 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-02
... Broadcast Construction Permits Scheduled for May 6, 2014; Comment Sought on Competitive Bidding Procedures... announces the auction of certain AM broadcast construction permits. Auction 84 will be a ``closed'' auction..., New York. II. Construction Permits In Auction 84 2. The Bureaus will proceed to auction for 22 new...
ERIC Educational Resources Information Center
Cammilleri, Anthony P.; Tiger, Jeffrey H.; Hanley, Gregory P.
2008-01-01
Children may recruit their teachers' attention at undesirably high rates or at inconvenient times. Tiger and Hanley (2004) described a multiple-schedule procedure to reduce ill-timed requests, which involved providing children with two distinct continuous signals that were correlated with periods in which teacher attention was either available or…
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 1 2010-07-01 2010-07-01 false Commercial Activities Inventory Report and Five-Year Review Schedule B Appendix B to Part 169a National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Pt. 169a, App. B Appendix...
ERIC Educational Resources Information Center
DeFulio, Anthony; Hackenberg, Timothy D.
2008-01-01
Pigeons pecked a response key on a variable-interval (VI) schedule, in which responses produced food every 40 s, on average. These VI periods, or components, alternated in irregular fashion with extinction components in which food was unavailable. Pecks on a second (observing) key briefly produced exteroceptive stimuli (houselight flashes)…
Teleportation with Multiple Accelerated Partners
NASA Astrophysics Data System (ADS)
Sagheer, A.; Hamdoun, H.; Metwally, N.
2015-09-01
As the current revolution in communication is underway, quantum teleportation can increase the level of security in quantum communication applications. In this paper, we present a quantum teleportation procedure that capable to teleport either accelerated or non-accelerated information through different quantum channels. These quantum channels are based on accelerated multi-qubit states, where each qubit of each of these channels represents a partner. Namely, these states are the W state, Greenberger-Horne-Zeilinger (GHZ) state, and the GHZ-like state. Here, we show that the fidelity of teleporting accelerated information is higher than the fidelity of teleporting non-accelerated information, both through a quantum channel that is based on accelerated state. Also, the comparison among the performance of these three channels shows that the degree of fidelity depends on type of the used channel, type of the measurement, and value of the acceleration. The result of comparison concludes that teleporting information through channel that is based on the GHZ state is more robust than teleporting information through channels that are based on the other two states. For future work, the proposed procedure can be generalized later to achieve communication through a wider quantum network.
The Associate Principal Astronomer for AI Management of Automatic Telescopes
NASA Technical Reports Server (NTRS)
Henry, Gregory W.
1998-01-01
This research program in scheduling and management of automatic telescopes had the following objectives: 1. To field test the 1993 Automatic Telescope Instruction Set (ATIS93) programming language, which was specifically developed to allow real-time control of an automatic telescope via an artificial intelligence scheduler running on a remote computer. 2. To develop and test the procedures for two-way communication between a telescope controller and remote scheduler via the Internet. 3. To test various concepts in Al scheduling being developed at NASA Ames Research Center on an automatic telescope operated by Tennessee State University at the Fairborn Observatory site in southern Arizona. and 4. To develop a prototype software package, dubbed the Associate Principal Astronomer, for the efficient scheduling and management of automatic telescopes.
Stepaniak, Pieter S; Soliman Hamad, Mohamed A; Dekker, Lukas R C; Koolen, Jacques J
2014-01-01
In this study, we sought to analyze the stochastic behavior of Catherization Laboratories (Cath Labs) procedures in our institution. Statistical models may help to improve estimated case durations to support management in the cost-effective use of expensive surgical resources. We retrospectively analyzed all the procedures performed in the Cath Labs in 2012. The duration of procedures is strictly positive (larger than zero) and has mostly a large minimum duration. Because of the strictly positive character of the Cath Lab procedures, a fit of a lognormal model may be desirable. Having a minimum duration requires an estimate of the threshold (shift) parameter of the lognormal model. Therefore, the 3-parameter lognormal model is interesting. To avoid heterogeneous groups of observations, we tested every group-cardiologist-procedure combination for the normal, 2- and 3-parameter lognormal distribution. The total number of elective and emergency procedures performed was 6,393 (8,186 h). The final analysis included 6,135 procedures (7,779 h). Electrophysiology (intervention) procedures fit the 3-parameter lognormal model 86.1% (80.1%). Using Friedman test statistics, we conclude that the 3-parameter lognormal model is superior to the 2-parameter lognormal model. Furthermore, the 2-parameter lognormal is superior to the normal model. Cath Lab procedures are well-modelled by lognormal models. This information helps to improve and to refine Cath Lab schedules and hence their efficient use.
22 CFR 221.22 - No acceleration of Eligible Notes.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false No acceleration of Eligible Notes. 221.22 Section 221.22 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS Procedure for Obtaining Compensation § 221.22 No acceleration of Eligible Notes...
22 CFR 221.22 - No acceleration of Eligible Notes.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 22 Foreign Relations 1 2014-04-01 2014-04-01 false No acceleration of Eligible Notes. 221.22 Section 221.22 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS Procedure for Obtaining Compensation § 221.22 No acceleration of Eligible Notes...
22 CFR 221.22 - No acceleration of Eligible Notes.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 22 Foreign Relations 1 2012-04-01 2012-04-01 false No acceleration of Eligible Notes. 221.22 Section 221.22 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS Procedure for Obtaining Compensation § 221.22 No acceleration of Eligible Notes...
22 CFR 221.22 - No acceleration of Eligible Notes.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 22 Foreign Relations 1 2013-04-01 2013-04-01 false No acceleration of Eligible Notes. 221.22 Section 221.22 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS Procedure for Obtaining Compensation § 221.22 No acceleration of Eligible Notes...
22 CFR 221.22 - No acceleration of Eligible Notes.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false No acceleration of Eligible Notes. 221.22 Section 221.22 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS Procedure for Obtaining Compensation § 221.22 No acceleration of Eligible Notes...
75 FR 39281 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-08
... reports, security procedures, public relations policies and procedures, news releases and scripts of media... activities as policy development, budget development, congressional and public relations, and project... disposal or reduce the retention period of records already authorized for disposal. NARA invites public...
Automated Planning and Scheduling for Orbital Express (151)
NASA Technical Reports Server (NTRS)
Knight, Russell
2008-01-01
The challenging timeline for DARPA's Orbital Express mission demanded a flexible, responsive, and (above all) safe approach to mission planning. Because the mission was a technology demonstration, pertinent planning information was learned during actual mission execution. This information led to amendments to procedures, which led to changes in the mission plan. In general, we used the ASPEN planner scheduler to generate and validate the mission plans. We enhanced ASPEN to enable it to reason about uncertainty. We also developed a model generator that would read the text of a procedure and translate it into an ASPEN model. These technologies had a significant impact on the success of the Orbital Express mission.
Efficiency Benefits Using the Terminal Area Precision Scheduling and Spacing System
NASA Technical Reports Server (NTRS)
Thipphavong, Jane; Swenson, Harry N.; Lin, Paul; Seo, Anthony Y.; Bagasol, Leonard N.
2011-01-01
NASA has developed a capability for terminal area precision scheduling and spacing (TAPSS) to increase the use of fuel-efficient arrival procedures during periods of traffic congestion at a high-density airport. Sustained use of fuel-efficient procedures throughout the entire arrival phase of flight reduces overall fuel burn, greenhouse gas emissions and noise pollution. The TAPSS system is a 4D trajectory-based strategic planning and control tool that computes schedules and sequences for arrivals to facilitate optimal profile descents. This paper focuses on quantifying the efficiency benefits associated with using the TAPSS system, measured by reduction of level segments during aircraft descent and flight distance and time savings. The TAPSS system was tested in a series of human-in-the-loop simulations and compared to current procedures. Compared to the current use of the TMA system, simulation results indicate a reduction of total level segment distance by 50% and flight distance and time savings by 7% in the arrival portion of flight (200 nm from the airport). The TAPSS system resulted in aircraft maintaining continuous descent operations longer and with more precision, both achieved under heavy traffic demand levels.
Multi-criteria evaluation methods in the production scheduling
NASA Astrophysics Data System (ADS)
Kalinowski, K.; Krenczyk, D.; Paprocka, I.; Kempa, W.; Grabowik, C.
2016-08-01
The paper presents a discussion on the practical application of different methods of multi-criteria evaluation in the process of scheduling in manufacturing systems. Among the methods two main groups are specified: methods based on the distance function (using metacriterion) and methods that create a Pareto set of possible solutions. The basic criteria used for scheduling were also described. The overall procedure of evaluation process in production scheduling was presented. It takes into account the actions in the whole scheduling process and human decision maker (HDM) participation. The specified HDM decisions are related to creating and editing a set of evaluation criteria, selection of multi-criteria evaluation method, interaction in the searching process, using informal criteria and making final changes in the schedule for implementation. According to need, process scheduling may be completely or partially automated. Full automatization is possible in case of metacriterion based objective function and if Pareto set is selected - the final decision has to be done by HDM.
Lusby, Richard Martin; Schwierz, Martin; Range, Troels Martin; Larsen, Jesper
2016-11-01
The aim of this paper is to provide an improved method for solving the so-called dynamic patient admission scheduling (DPAS) problem. This is a complex scheduling problem that involves assigning a set of patients to hospital beds over a given time horizon in such a way that several quality measures reflecting patient comfort and treatment efficiency are maximized. Consideration must be given to uncertainty in the length of stays of patients as well as the possibility of emergency patients. We develop an adaptive large neighborhood search (ALNS) procedure to solve the problem. This procedure utilizes a Simulated Annealing framework. We thoroughly test the performance of the proposed ALNS approach on a set of 450 publicly available problem instances. A comparison with the current state-of-the-art indicates that the proposed methodology provides solutions that are of comparable quality for small and medium sized instances (up to 1000 patients); the two approaches provide solutions that differ in quality by approximately 1% on average. The ALNS procedure does, however, provide solutions in a much shorter time frame. On larger instances (between 1000-4000 patients) the improvement in solution quality by the ALNS procedure is substantial, approximately 3-14% on average, and as much as 22% on a single instance. The time taken to find such results is, however, in the worst case, a factor 12 longer on average than the time limit which is granted to the current state-of-the-art. The proposed ALNS procedure is an efficient and flexible method for solving the DPAS problem. Copyright © 2016 Elsevier B.V. All rights reserved.
An expert system for scheduling requests for communications Links between TDRSS and ERBS
NASA Technical Reports Server (NTRS)
Mclean, David R.; Littlefield, Ronald G.; Beyer, David S.
1987-01-01
An ERBS-TDRSS Contact Planning System (ERBS-TDRSS CPS) is described which uses a graphics interface and the NASA Transportable Interference Engine. The procedure involves transfer of the ERBS-TDRSS Ground Track Orbit Prediction data to the ERBS flight operations area, where the ERBS-TDRSS CPS automatically generates requests for TDRSS service. As requested events are rejected, alternative context sensitive strategies are employed to generate new requested events until a schedule is completed. A report generator builds schedule requests for separate ERBS-TDRSS contacts.
Convoy projects: a case study from Germany
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gruener, W.
The Convoy concept was formulated at a time when Kraftwerk Union (KWU) anticipated the start of five to six turnkey nuclear power plant projects within a very short time frame, related to as many customers, sites, and licensing authorities. To counteract the rapidly escalating costs and schedules of projects then under construction, a series of measures were enacted with the purpose of streamlining and optimizing the work procedures both within the company and in relation with the external partners - customers, licensing authorities and their technical advisors, suppliers, and subsuppliers. The organizational framework and the various tools deployed by themore » turnkey contractor ensured smooth and effective design and construction procedures. The adherence to the original budget and schedule is truly remarkable, encouraging further investigation into the applicability of such methods and procedures for future projects.« less
Quasi-reinforcement: control of responding by a percentage-reinforcement schedule1
Neuringer, Allen J.; Chung, Shin-Ho
1967-01-01
When a variable-interval schedule of reinforcement was segmented into small fixed-interval components, with reinforcements following some components and brief blackouts following the others, rate of responding doubled and a positively accelerated pattern within each component was obtained. Presented according to this percentage reinforcement paradigm, the blackouts approximated the functions of a food reinforcer. These effects occurred only when the behavior sequence required to produce reinforcement was identical to that required to produce blackout. The quasi-reinforcing effects of these blackout stimuli suggest that a neutral stimulus need not occasion or accompany a primary reinforcer to acquire reinforcing properties. PMID:16811304
New tax law hobbles tax-exempt hospitals.
Goldblatt, S J
1982-03-01
The Economic Recovery Tax Act of 1981 left tax-exempt hospitals at a significant disadvantage in the competition for capital. Although the new law's accelerated depreciation schedules and liberalized investment tax credits contain some marginal benefits for tax-exempt hospitals, these benefits are probably more than offset by the impact of the law on charitable giving.
A Hybrid Procedural/Deductive Executive for Autonomous Spacecraft
NASA Technical Reports Server (NTRS)
Pell, Barney; Gamble, Edward B.; Gat, Erann; Kessing, Ron; Kurien, James; Millar, William; Nayak, P. Pandurang; Plaunt, Christian; Williams, Brian C.; Lau, Sonie (Technical Monitor)
1998-01-01
The New Millennium Remote Agent (NMRA) will be the first AI system to control an actual spacecraft. The spacecraft domain places a strong premium on autonomy and requires dynamic recoveries and robust concurrent execution, all in the presence of tight real-time deadlines, changing goals, scarce resource constraints, and a wide variety of possible failures. To achieve this level of execution robustness, we have integrated a procedural executive based on generic procedures with a deductive model-based executive. A procedural executive provides sophisticated control constructs such as loops, parallel activity, locks, and synchronization which are used for robust schedule execution, hierarchical task decomposition, and routine configuration management. A deductive executive provides algorithms for sophisticated state inference and optimal failure recover), planning. The integrated executive enables designers to code knowledge via a combination of procedures and declarative models, yielding a rich modeling capability suitable to the challenges of real spacecraft control. The interface between the two executives ensures both that recovery sequences are smoothly merged into high-level schedule execution and that a high degree of reactivity is retained to effectively handle additional failures during recovery.
The reality of the surgical fasting time in the era of the ERAS protocol.
Cestonaro, Talita; Madalozzo Schieferdecker, Maria Eliana; Thieme, Rubia Daniela; Neto Cardoso, João; Ligocki Campos, Antônio Carlos
2014-02-01
Multimodal protocols to optimize perioperative care and to accelerate postoperative recovery include abbreviated pre-and postoperative fasting. The aim of this study was to investigate the pre and postoperative fasting period and the factors that influence it in patients who underwent elective operations. We included patients who underwent surgery of the digestive tract and abdominal wall. Data were collected from the patients and from their personal health records. We included 135 patients between 19 and 89 years old. Most were adults (75.55%), female (60.74%) and the most common procedures were hernioplasty (42.96%) and cholecystectomy (34.81%). The preoperative fasting periods for solids and liquids were similar, median 16.50 (5.50-56.92) and 15.75 (2.50- 56.92) hours, respectively. The preoperative fasting period was influenced by the instruction received and surgery time. Postoperative fasting period was 15.67 (1.67-90.42) hours and was influenced by type of surgery and lack of synchrony between the clinical meeting and the nutrition and dietetics service schedules. Copyright AULA MEDICA EDICIONES 2014. Published by AULA MEDICA. All rights reserved.
Ibias, Javier; Pellón, Ricardo
2011-09-30
Eight Spontaneously Hypertensive Rat (SHR), 8 Wistar-Kyoto (WKY) and 8 Wistar rats, all male, maintained at 80-85% of their free-feeding weight by controlled access to food, were exposed to a series of fixed time (FT) schedules whereby food pellets were regularly delivered regardless of the animals' behaviour. The FT values used were 9, 15, 30, 60, 120 and 180 s, with the order of presentation of the schedules among the animals being counterbalanced (except under the FT 120-s and 180-s schedules, which were successively presented as the last two of the series). Due to freely available access to water, the animals developed schedule-induced drinking under all FT schedules, marked by the characteristic bitonic function that relates the number of licks and amount of water drunk to the length of the inter-food interval. Wistar and WKY rats displayed maximum drinking under an FT 15-s schedule, with WKY rats registering lower quantities across all FT values. Among SHR rats, maximum schedule-induced polydipsia was observed under the FT 30-s schedule, with a rightward shift in the bitonic function compared to controls. For long FT values, the temporal distribution of licks within inter-food intervals was shifted slightly towards the right in the SHR rats. In a subsequent study, only the SHR and Wistar rats were used, and the animals were exposed to a delay-discounting procedure. The rats were faced with successive choices, in which they could choose between an immediate reward of one food pellet and another of four food pellets at a delay of 3, 6, 12 or 24s. In the case of the longer delays, SHR rats chose the immediate reward of lower magnitude more often than did their Wistar counterparts, and also committed a greater number of omissions during the forced-choice trials of the procedure. The results indicate that differences in schedule-induced polydipsia are related to indexes of cognitive rather than motor impulsivity, a finding in line with the theoretical idea that adjunctive behaviour is linked to operant reinforcement processes. Copyright © 2011 Elsevier B.V. All rights reserved.
77 FR 12175 - Airworthiness Directives; DASSAULT AVIATION Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... specified products. The MCAI states: The Maintenance Procedure (MP) 57-607, related to non destructive check... Recommended Maintenance Schedules chapter of the Aircraft Maintenance Documentation. After the implementation... maintenance program to include ``Non-Destructive Check of Flap Tracks 2 and 5,'' Maintenance Procedure 57-607...
DOT National Transportation Integrated Search
2008-10-01
This research effort sought to develop statistically justifiable means for developing a : schedule of liquidated damage (LD) rates to be adopted by the Alabama Department of : Transportation (ALDOT). The procedure outlined is to be used to review and...
5 CFR 1302.6 - Schedule of fees.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Administrative Personnel OFFICE OF MANAGEMENT AND BUDGET ADMINISTRATIVE PROCEDURES PRIVACY ACT PROCEDURES § 1302... and mailed or delivered to the Assistant to the Director for Administration, Office of Management and Budget, Washington, DC 20503. (5) A receipt for fees paid will be given upon request. ...
49 CFR 1111.2 - Amended and supplemental complaints.
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE COMPLAINT AND INVESTIGATION PROCEDURES... evidence to opt for a different rate reasonableness methodology, among Three-Benchmark, Simplified-SAC or Full-SAC. If so amended, the procedural schedule begins again under the new methodology as set forth at...
Smallman, Bettina; Dexter, Franklin
2010-03-01
Research in predictive variability of operating room (OR) times has been performed using data from multidisciplinary, tertiary hospitals with mostly adult patients. In this article, we discuss case-duration prediction for children receiving general anesthesia for endoscopy. We critique which of the several types of OR management decisions dependent on accuracy of prediction are relevant to series (lists) of brief pediatric anesthetics. OR information system data were obtained for all children (aged 18 years and younger) undergoing a gastroenterology procedure with an anesthesiologist over 21 months. Summaries of data were used for a qualitative, systematic review of prior studies to learn which apply to brief pediatric cases. Patient arrival times were changed to be based on the statistical method relating actual and scheduled start times (Wachtel and Dexter, Anesth Analg 2007;105:127-40). Even perfect case-duration prediction would not affect whether a brief case was performed on a certain date and/or in a certain OR. There was no evidence of usefulness in calculating the probability that one case would last longer than another or in resequencing cases to influence postanesthesia care unit staffing or patient waiting from scheduled start times. The only decision for which the accuracy of case-duration prediction mattered was for the shortest time that preceding cases in the OR may take. Knowledge of the preceding procedures in the OR was not useful for that purpose because there were hundreds of combinations of preceding procedures and some cases cancelled. Instead, patient ready times were chosen based on 5% lower prediction bounds for ratios of actual to scheduled OR times. The approach was useful based on a 30% reduction in patient waiting times from scheduled start times with corresponding expected reductions in average and peak numbers of patients in the holding area. For brief pediatric OR anesthetics, predictive variability of case durations matters principally to the extent that it affects appropriate patient ready times. Such times should not be chosen by having patients start fasting, arrive, and be ready fixed numbers of hours before their scheduled start times.
ERIC Educational Resources Information Center
Ta, Wei-Min; Pitts, Raymond C.; Hughes, Christine E.; McLean, Anthony P.; Grace, Randolph C.
2008-01-01
The purpose of this study was to examine effects of "d"-amphetamine on choice controlled by reinforcement delay. Eight pigeons responded under a concurrent-chains procedure in which one terminal-link schedule was always fixed- interval 8 s, and the other terminal-link schedule changed from session to session between fixed-interval 4 s and…
Benchmarking GNU Radio Kernels and Multi-Processor Scheduling
2013-01-14
AMD E350 APU , comparable to Atom • ARM Cortex A8 running on a Gumstix Overo on an Ettus USRP E110 The general testing procedure consists of • Build...Intel Atom, and the AMD E350 APU . 3.2 Multi-Processor Scheduling Figure 1: GFLOPs per second through an FFT array on an Intel i7. Example output from
GSFC Technology Development Center Report
NASA Technical Reports Server (NTRS)
Himwich, Ed; Gipson, John
2013-01-01
This report summarizes the activities of the GSFC Technology Development Center (TDC) for 2012 and forecasts planned activities for 2013. The GSFC TDC develops station software including the Field System (FS), scheduling software (SKED), hardware including tools for station timing and meteorology, scheduling algorithms, and operational procedures. It provides a pool of individuals to assist with station implementation, check-out, upgrades, and training.
40 CFR 86.164-08 - Supplemental Federal Test Procedure calculations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... for the test schedules of FTP, US06, and SC03. (b) The provisions of § 86.144-94(a) are applicable to... the FTP test schedule (Ywm). (c)(1) When the test vehicle is equipped with air conditioning, the final... = Mass emissions per mile for a particular pollutant weighted in terms of the contributions from the FTP...
ERIC Educational Resources Information Center
Hockey, G. Robert J.; Earle, Fiona
2006-01-01
Two experiments tested the hypothesis that task-induced mental fatigue is moderated by control over work scheduling. Participants worked for 2 hr on simulated office work, with control manipulated by a yoking procedure. Matched participants were assigned to conditions of either high control (HC) or low control (LC). HC participants decided their…
[Vaccination schedule of the Spanish association of paediatrics: recommendations 2010].
Marès Bermúdez, J; van Esso Arbolave, D; Arístegui Fernández, J; Ruiz Contreras, J; González Hachero, J; Merino Moína, M; Barrio Corrales, F; Alvarez García, F J; Cilleruelo Ortega, M J; Ortigosa Del Castillo, L; Moreno Pérez, D
2010-06-01
The Vaccine Advisory Committee of the Spanish Association of Paediatrics updates annually, the immunization schedule, taking into account epidemiological data, as well as evidence of the effectiveness and efficiency of vaccines. This vaccination schedule includes grades of recommendation. The committee has graded as universal vaccines those that all children should receive, as recommended those with a profile of universal vaccination in childhood and which are desirable that all children receive, but that can be prioritized based on resources for its public funding and for risk groups those targeting groups of people in situations of epidemiological risk. The Committee considers as a priority to achieve a common immunization schedule. The Committee reaffirms the recommendation to include pneumococcal vaccination in the routine vaccination schedule. Vaccination against varicella in the second year of life is an effective strategy and therefore a desirable goal. Vaccination against rotavirus is recommended for all infants given the morbidity and high burden on the health care system. The Committee adheres to the recommendations of the Interterritorial Council of the National Health Care System in reference to routine vaccination against HPV for all girls aged 11 to 14 years and stresses the need to vaccinate against influenza and hepatitis A all patients with risk factors for these diseases. Finally, it stresses the need to update incomplete immunization schedules using accelerated immunization schedules. Copyright 2010 Asociación Española de Pediatría. Published by Elsevier Espana. All rights reserved.
Purdue University National Biomedical Tracer Facility: Project definition phase. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Green, M.A.
The proposed National Biomedical Tracer Facility (NBTF) will house a high-current accelerator dedicated to production of short-lived radionuclides for biomedical and scientific research. The NBTF will play a vital role in repairing and maintaining the United States` research infrastructure for generation of essential accelerator-based radioisotopes. If properly designed and managed, the NBTF should also achieve international recognition as a Center-of-Excellence for research on radioisotope production methods and for associated education and training. The current report documents the results of a DOE-funded NBTF Project Definition Phase study carried out to better define the technical feasibility and projected costs of establishing andmore » operating the NBTF. This report provides an overview of recommended Facility Design and Specifications, including Accelerator Design, Building Design, and the associated Construction Cost Estimates and Schedule. It is recommended that the NBTF be established as an integrated, comprehensive facility for meeting the diverse production, research, and educational missions set forth in previous documents. Based on an analysis of the projected production demands that will be placed on the NBTF, it appears that a 70 MeV, 1 mA, negative ion cyclotron will offer a good balance between production capabilities and the costs of accelerator purchase and operation. A preliminary architectural plan is presented for a facility designed specifically to fulfill the functions of the NBTF in a cost-effective manner. This report also presents a detailed analysis of the Required Federal State, and Local Permits that may be needed to establish the NBTF, along with schedules and cost estimates for obtaining these permits. The Handling, Storage, and Disposal of Radioactive Waste will pose some significant challenges in the operation of the NBTF, but at this stage of planning the associated problems do not appear to be prohibitive.« less
Behavioral regulation of gravity - Schedule effects under escape-avoidance procedures
NASA Technical Reports Server (NTRS)
Clark, F. C.; Lange, K. O.; Belleville, R. E.
1973-01-01
Squirrel monkeys were restrained in a centrifuge capsule and trained to escape and avoid increases in artificial gravity. During escape-avoidance, lever responses reduced centrifugally simulated gravity or postponed scheduled increases. The effect of variation in the interval of postponement (equal to the duration of decrease produced by escape responses) was studied under a multiple schedule of four components. Three components were gravity escape-avoidance with postponement times of 20, 40, and 60 sec. The fourth component was extinction. Each component was associated with a different auditory stimulus. Rate of responding decreased with increasing postponement time and higher mean g-levels occurred at shorter intervals of postponement. Effects of the schedule parameter on response rate and mean g-level were similar to effects of the schedule on free-operant avoidance and on titration behavior maintained by shock.
23 CFR 1340.7 - Observation procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OBSERVATIONAL SURVEYS OF SEAT BELT USE Survey Design Requirements § 1340.7 Observation procedures. (a) Data collection dates. All survey data shall be collected through direct observation completely within the...), the survey shall be conducted in accordance to the schedule determined in § 1340.6. (b) Roadway and...
23 CFR 1340.7 - Observation procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OBSERVATIONAL SURVEYS OF SEAT BELT USE Survey Design Requirements § 1340.7 Observation procedures. (a) Data collection dates. All survey data shall be collected through direct observation completely within the...), the survey shall be conducted in accordance to the schedule determined in § 1340.6. (b) Roadway and...
23 CFR 1340.7 - Observation procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OBSERVATIONAL SURVEYS OF SEAT BELT USE Survey Design Requirements § 1340.7 Observation procedures. (a) Data collection dates. All survey data shall be collected through direct observation completely within the...), the survey shall be conducted in accordance to the schedule determined in § 1340.6. (b) Roadway and...
40 CFR 1066.410 - Dynamometer test procedure.
Code of Federal Regulations, 2014 CFR
2014-07-01
... drive mode. (For purposes of this paragraph (g), the term four-wheel drive includes other multiple drive... Dynamometer test procedure. (a) Dynamometer testing may consist of multiple drive cycles with both cold-start...-setting part identifies the driving schedules and the associated sample intervals, soak periods, engine...
CTEPP STANDARD OPERATING PROCEDURE FOR OBTAINING INFORMED CONSENT (SOP-1.13)
The CTEPP informed consent procedures are described in the SOP. After an eligible subject provides verbal consent, staff schedule a visit to meet with the subject in person to explain study activities and answer questions about the study. During the visit, staff demonstrate how...
49 CFR 1572.21 - Procedures for TWIC security threat assessment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... conducts includes a fingerprint-based criminal history records check (CHRC), an intelligence-related check, and a final disposition. (b) Fingerprint-based check. The following procedures must be completed to conduct a fingerprint-based CHRC: (1) Consistent with the implementation schedule described in 49 CFR 1572...
49 CFR 1572.21 - Procedures for TWIC security threat assessment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... conducts includes a fingerprint-based criminal history records check (CHRC), an intelligence-related check, and a final disposition. (b) Fingerprint-based check. The following procedures must be completed to conduct a fingerprint-based CHRC: (1) Consistent with the implementation schedule described in 49 CFR 1572...
49 CFR 1572.21 - Procedures for TWIC security threat assessment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... conducts includes a fingerprint-based criminal history records check (CHRC), an intelligence-related check, and a final disposition. (b) Fingerprint-based check. The following procedures must be completed to conduct a fingerprint-based CHRC: (1) Consistent with the implementation schedule described in 49 CFR 1572...
49 CFR 1572.21 - Procedures for TWIC security threat assessment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... conducts includes a fingerprint-based criminal history records check (CHRC), an intelligence-related check, and a final disposition. (b) Fingerprint-based check. The following procedures must be completed to conduct a fingerprint-based CHRC: (1) Consistent with the implementation schedule described in 49 CFR 1572...
49 CFR 1572.21 - Procedures for TWIC security threat assessment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... conducts includes a fingerprint-based criminal history records check (CHRC), an intelligence-related check, and a final disposition. (b) Fingerprint-based check. The following procedures must be completed to conduct a fingerprint-based CHRC: (1) Consistent with the implementation schedule described in 49 CFR 1572...
75 FR 67165 - Proposed Collection; Comment Request for Revenue Procedure2007-XX (RP-155430-05)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-01
... Revenue Procedure 2007- XX (RP-155430-05) AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice... soliciting comments concerning Revenue Procedure 2007-XX (RP-155430-05), Section 6707/6707A Accelerated... Procedure 2007-XX (RP-155430-05). Abstract: The collection of information this revenue procedure requires is...
Accelerated Math®. Secondary Mathematics. What Works Clearinghouse Intervention Report
ERIC Educational Resources Information Center
What Works Clearinghouse, 2017
2017-01-01
This intervention report presents findings from a systematic review of "Accelerated Math®" conducted using the WWC Procedures and Standards Handbook (version 3.0) and the Secondary Mathematics review protocol (version 3.1). No studies of "Accelerated Math®" that fall within the scope of the Secondary Mathematics review protocol…
Cartelli, D; Vento, V Thatar; Castell, W; Di Paolo, H; Kesque, J M; Bergueiro, J; Valda, A A; Erhardt, J; Kreiner, A J
2011-12-01
The accelerator tubes are essential components of the accelerator. Their function is to transport and accelerate a very intense proton or deuteron beam through the machine, from the ion source to the neutron production target, without significant losses. In this contribution, we discuss materials selected for the tube construction, the procedures used for their assembly and the testing performed to meet the stringent requirements to which it is subjected. Copyright © 2011 Elsevier Ltd. All rights reserved.
Human's choices in situations of time-based diminishing returns.
Hackenberg, T D; Axtell, S A
1993-01-01
Three experiments examined adult humans' choices in situations with contrasting short-term and long-term consequences. Subjects were given repeated choices between two time-based schedules of points exchangeable for money: a fixed schedule and a progressive schedule that began at 0 s and increased by 5 s with each point delivered by that schedule. Under "reset" conditions, choosing the fixed schedule not only produced a point but it also reset the requirements of the progressive schedule to 0 s. In the first two experiments, reset conditions alternated with "no-reset" conditions, in which progressive-schedule requirements were independent of fixed-schedule choices. Experiment 1 entailed choices between a progressive-interval schedule and a fixed-interval schedule, the duration of which varied across conditions. Switching from the progressive- to the fixed-interval schedule was systematically related to fixed-interval size in 4 of 8 subjects, and in all subjects occurred consistently sooner in the progressive-schedule sequence under reset than under no-reset procedures. The latter result was replicated in a second experiment, in which choices between progressive- and fixed-interval schedules were compared with choices between progressive- and fixed-time schedules. In Experiment 3, switching patterns under reset conditions were unrelated to variations in intertrial interval. In none of the experiments did orderly choice patterns depend on verbal descriptions of the contingencies or on schedule-controlled response patterns in the presence of the chosen schedules. The overall pattern of results indicates control of choices by temporarily remote consequences, and is consistent with versions of optimality theory that address performance in situations of diminishing returns. PMID:8315364
Rare isotope accelerator project in Korea and its application to high energy density sciences
NASA Astrophysics Data System (ADS)
Chung, M.; Chung, Y. S.; Kim, S. K.; Lee, B. J.; Hoffmann, D. H. H.
2014-01-01
As a national science project, the Korean government has recently established the Institute for Basic Science (IBS) with the goal of conducting world-class research in basic sciences. One of the core facilities for the IBS will be the rare isotope accelerator which can produce high-intensity rare isotope beams to investigate the fundamental properties of nature, and also to support a broad research program in material sciences, medical and biosciences, and future nuclear energy technologies. The construction of the accelerator is scheduled to be completed by approximately 2017. The design of the accelerator complex is optimized to deliver high average beam current on targets, and to maximize the production of rare isotope beams through the simultaneous use of Isotope Separation On-Line (ISOL) and In-Flight Fragmentation (IFF) methods. The proposed accelerator is, however, not optimal for high energy density science, which usually requires very high peak currents on the target. In this study, we present possible beam-plasma experiments that can be done within the scope of the current accelerator design, and we also investigate possible future extension paths that may enable high energy density science with intense pulsed heavy ion beams.
Tannamala, Pavan Kumar; Azhagarasan, Nagarasampatti Sivaprakasam; Shankar, K Chitra
2013-01-01
Conventional casting techniques following the manufacturers' recommendations are time consuming. Accelerated casting techniques have been reported, but their accuracy with base metal alloys has not been adequately studied. We measured the vertical marginal gap of nickel-chromium copings made by conventional and accelerated casting techniques and determined the clinical acceptability of the cast copings in this study. Experimental design, in vitro study, lab settings. Ten copings each were cast by conventional and accelerated casting techniques. All copings were identical, only their mold preparation schedules differed. Microscopic measurements were recorded at ×80 magnification on the perpendicular to the axial wall at four predetermined sites. The marginal gap values were evaluated by paired t test. The mean marginal gap by conventional technique (34.02 μm) is approximately 10 μm lesser than that of accelerated casting technique (44.62 μm). As the P value is less than 0.0001, there is highly significant difference between the two techniques with regard to vertical marginal gap. The accelerated casting technique is time saving and the marginal gap measured was within the clinically acceptable limits and could be an alternative to time-consuming conventional techniques.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leitner, M.; Bieniosek, F.; Kwan, J.
The Heavy Ion Fusion Science Virtual National Laboratory (HIFS-VNL), a collaboration between Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), and Princeton Plasma Physics Laboratory (PPPL), is currently constructing a new induction linear accelerator, called Neutralized Drift Compression eXperiment NDCX-II. The accelerator design makes effective use of existing components from LLNL's decommissioned Advanced Test Accelerator (ATA), especially induction cells and Blumlein voltage sources that have been transferred to LBNL. We have developed an aggressive acceleration 'schedule' that compresses the emitted ion pulse from 500 ns to 1 ns in just 15 meters. In the nominal design concept, 30more » nC of Li{sup +} are accelerated to 3.5 MeV and allowed to drift-compress to a peak current of about 30 A. That beam will be utilized for warm dense matter experiments investigating the interaction of ion beams with matter at high temperature and pressure. Construction of the accelerator will be complete within a period of approximately two and a half years and will provide a worldwide unique opportunity for ion-driven warm dense matter experiments as well as research related to novel beam manipulations for heavy ion fusion drivers.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ghoudjehbaklou, H.; Puttgen, H.B.
This paper outlines an optimum spot price determination procedure in the general context of the Public Utility Regulatory Policies Act, PURPA, provisions. PURPA stipulates that local utilities must offer to purchase all available excess electric energy from Qualifying Facilities, QF, at fair market prices. As a direct consequence of these PURPA regulations, a growing number of owners are installing power producing facilities and optimize their operational schedules to minimize their utility related costs or, in some cases, actually maximize their revenues from energy sales to the local utility. In turn, the utility strives to use spot prices which maximize itsmore » revenues from any given Small Power Producing Facility, SPPF, a schedule while respecting the general regulatory and contractual framework. the proposed optimum spot price determination procedure fully models the SPPF operation, it enforces the contractual and regulatory restrictions, and it ensures the uniqueness of the optimum SPPF schedule.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ghoudjehbaklou, H.; Puttgen, H.B.
The present paper outlines an optimum spot price determination procedure in the general context of the Public Utility Regulatory Policies Act, PURPA, provisions. PURPA stipulates that local utilities must offer to purchase all available excess electric energy from Qualifying Facilities, QF, at fair market prices. As a direct consequence of these PURPA regulations, a growing number of owners are installing power producing facilities and optimize their operational schedules to minimize their utility related costs or, in some cases, actually maximize their revenues from energy sales to the local utility. In turn, the utility will strive to use spot prices whichmore » maximize its revenues from any given Small Power Producing Facility, SPPF, schedule while respecting the general regulatory and contractual framework. The proposed optimum spot price determination procedure fully models the SPPF operation, it enforces the contractual and regulatory restrictions, and it ensures the uniqueness of the optimum SPPF schedule.« less
A comprehensive and efficient process for counseling patients desiring sterilization.
Haws, J M; Butta, P G; Girvin, S
1997-06-01
To optimize the time spent counseling a sterilization patient, this article presents a 10-step process that includes all steps necessary to ensure a comprehensive counseling session: (1) Discuss current contraception use and all available methods; (2) assess the client's interest in/readiness for sterilization; (3) emphasize that the procedure is meant to be permanent, but there is a possibility of failure; (4) explain the surgical procedure using visuals, and include a discussion of benefits and risks; (5) explain privately to the client the need to use condoms if engaging in risky sexual activity; (6) have the client read and sign an informed consent form; (7) schedule an appointment for the procedure and provide the patient with a copy of all necessary paperwork; (8) discuss cost and payment method; (9) provide written preoperative and postoperative instructions; and (10) schedule a postoperation visit, or a postoperation semen analysis.
NASA Astrophysics Data System (ADS)
Yusriski, R.; Sukoyo; Samadhi, T. M. A. A.; Halim, A. H.
2018-03-01
This research deals with a single machine batch scheduling model considering the influenced of learning, forgetting, and machine deterioration effects. The objective of the model is to minimize total inventory holding cost, and the decision variables are the number of batches (N), batch sizes (Q[i], i = 1, 2, .., N) and the sequence of processing the resulting batches. The parts to be processed are received at the right time and the right quantities, and all completed parts must be delivered at a common due date. We propose a heuristic procedure based on the Lagrange method to solve the problem. The effectiveness of the procedure is evaluated by comparing the resulting solution to the optimal solution obtained from the enumeration procedure using the integer composition technique and shows that the average effectiveness is 94%.
1987-03-16
CAPE CANAVERAL, Fla. -- At Cape Canaveral Air Force Station in Florida, the paylaod fairing of the Delta 182 launch vehicle is carefully moved into place as encapsulation procedures continue on the Palapa B2-P communications satellite at Launch Complex 17, Pad B. Palapa is scheduled for launch from Cape Canaveral for the government of Indonesia. Liftoff of Delta 182 and Palapa is scheduled for March 20. Photo Credit: NASA
12-hour shifts: an ethical dilemma for the nurse executive.
Lorenz, Susan G
2008-06-01
Flexible work hours, including 12-hour shifts, have become a common scheduling option for nurses. The author explores whether 12-hour shifts are an ethical scheduling option for nurses because recent research suggests that 12-hour shifts are a potential hazard to patients. A multistep model for ethical decision making, reflecting the concept of procedural justice, is used to examine this issue.
32 CFR 296.4 - Procedures for request of records.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 2 2010-07-01 2010-07-01 false Procedures for request of records. 296.4 Section 296.4 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED... of the Department of Defense, the applicable published Department rules and schedules with respect to...
32 CFR 296.4 - Procedures for request of records.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 2 2014-07-01 2014-07-01 false Procedures for request of records. 296.4 Section 296.4 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED... of the Department of Defense, the applicable published Department rules and schedules with respect to...
The purpose of this SOP is to provide an overview of field sampling procedures. This SOP details the samples taken, the responsibilities of the field staff, an approximate schedule for field operations, persons responsible for analyses, equipment used for sampling, and contents ...
Investigation of a Reinforcement-Based Toilet Training Procedure for Children with Autism.
ERIC Educational Resources Information Center
Cicero, Frank R.; Pfadt, Al
2002-01-01
This study evaluated the effectiveness of a reinforcement-based toilet training intervention with three children with autism. Procedures included positive reinforcement, graduated guidance, scheduled practice trials, and forward prompting. All three children reduced urination accidents to zero and learned to request bathroom use spontaneously…
14 CFR 302.211 - Procedures in certificate cases involving initial or continuing fitness.
Code of Federal Regulations, 2012 CFR
2012-01-01
... initial or continuing fitness. 302.211 Section 302.211 Aeronautics and Space OFFICE OF THE SECRETARY... Disposition of Applications § 302.211 Procedures in certificate cases involving initial or continuing fitness... applicant's fitness to operate. Where such applications propose the operation of scheduled service in...
14 CFR 302.211 - Procedures in certificate cases involving initial or continuing fitness.
Code of Federal Regulations, 2014 CFR
2014-01-01
... initial or continuing fitness. 302.211 Section 302.211 Aeronautics and Space OFFICE OF THE SECRETARY... Disposition of Applications § 302.211 Procedures in certificate cases involving initial or continuing fitness... applicant's fitness to operate. Where such applications propose the operation of scheduled service in...
14 CFR 302.211 - Procedures in certificate cases involving initial or continuing fitness.
Code of Federal Regulations, 2013 CFR
2013-01-01
... initial or continuing fitness. 302.211 Section 302.211 Aeronautics and Space OFFICE OF THE SECRETARY... Disposition of Applications § 302.211 Procedures in certificate cases involving initial or continuing fitness... applicant's fitness to operate. Where such applications propose the operation of scheduled service in...
47 CFR 1.1121 - Billing procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Schedule of Statutory Charges and... Telecommunications Settlements (§ 1.1103 of this subpart), Accounting and Audits Field Audits and Review of Arrest Audits (§ 1.1106 of this subpart) should not be paid with the filing or submission of the request. The...
14 CFR 302.211 - Procedures in certificate cases involving initial or continuing fitness.
Code of Federal Regulations, 2010 CFR
2010-01-01
... initial or continuing fitness. 302.211 Section 302.211 Aeronautics and Space OFFICE OF THE SECRETARY... Disposition of Applications § 302.211 Procedures in certificate cases involving initial or continuing fitness... applicant's fitness to operate. Where such applications propose the operation of scheduled service in...
14 CFR 302.211 - Procedures in certificate cases involving initial or continuing fitness.
Code of Federal Regulations, 2011 CFR
2011-01-01
... initial or continuing fitness. 302.211 Section 302.211 Aeronautics and Space OFFICE OF THE SECRETARY... Disposition of Applications § 302.211 Procedures in certificate cases involving initial or continuing fitness... applicant's fitness to operate. Where such applications propose the operation of scheduled service in...
20 CFR 416.557 - Personal conference.
Code of Federal Regulations, 2010 CFR
2010-04-01
... notified in writing and given the dates, times and place of the file review and personal conference; the procedure for reviewing the claims file prior to the personal conference; the procedure for seeking a change... individual about the personal conference. The file review is always scheduled at least 5 days before the...
20 CFR 416.557 - Personal conference.
Code of Federal Regulations, 2011 CFR
2011-04-01
... notified in writing and given the dates, times and place of the file review and personal conference; the procedure for reviewing the claims file prior to the personal conference; the procedure for seeking a change... individual about the personal conference. The file review is always scheduled at least 5 days before the...
7 CFR 1753.8 - Contract construction procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... of all bids including “Buy American” evaluations, if any, and all other evaluations required by law... Contract construction procedures. (a) Sealed, competitive bidding—(1) Bid opening date. The borrower is responsible for scheduling the bid opening date. If RUS review of P&S is required by § 1753.7, the borrower...
Motivational Control of Impulsive Behavior Interacts with Choice Opportunities
ERIC Educational Resources Information Center
Tanno, Takayuki; Kurashima, Ryo; Watanabe, Shigeru
2011-01-01
Impulsive behavior has been investigated through choice between a smaller/immediate reinforcer and a larger/delayed reinforcer, or through performance on a differential reinforcement of low rate (DRL) schedule. In the present study, we investigated a methodological divergence between these two procedures: in the former procedure, delay is a…
Laura M. Ladwig; Scott L. Collins; Paulette L. Ford; Laura B. White
2014-01-01
Land managers frequently use prescribed burning to help maintain grassland communities. Semiarid grassland dynamics following fire are linked to precipitation, with increasing soil moisture accelerating the rate of recovery. Prescribed fires are typically scheduled to follow natural fire regimes, but burning outside the natural fire season could be equally effective...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-12
... Accelerated Approval to a Proposed Rule Change Relating to the Amounts That Direct Edge ECN, in Its Capacity... Substance of the Proposed Rule Change The Exchange proposes to modify the amounts that Direct Edge ECN... immediate effectiveness a proposed rule change to amend Direct Edge ECN's (``DECN'') fee schedule for ISE...
Giving Students Extra Support to Meet Standards in Challenging Academic and Career Courses.
ERIC Educational Resources Information Center
Southern Regional Education Board (SREB), 2010
2010-01-01
Successful schools at all levels provide extra-help strategies to assist students in meeting high standards in both academic and career/technical courses. Some schools design a flexible schedule and offer virtual learning opportunities to enable at-risk students to complete high school. Middle grades schools can provide an accelerated curriculum…
1976-03-01
6- 18 6.5 Acceleration Mode - Purumeter Accuracy Comparison 6- 18 6.6 Acceleratiin Mode - Sensor Accuracy Cormpriwon 6- 0 6.7 .OP/P Surqt Control...Spool Speeds 6-42 6. 18 Fan Pressure Ratio Schedule 6-43 6.19 SFC with Control Mode 01 6-45 6.20 Optimal T4.1 vs. NHCl 6-46 6.21 Adjusted SFC for... 18 Intermediate Power to Idle Decelberation at Mach 2.2 and 36,089 Feet 7-39 7.19 Idle to Intermediate Power Acceleration at Mach 1.2 and 500 feet 7
Identifying regional opportunities for accelerated timber managemnet
David A. Gansner; Joseph E. Barnard; Samuel F. Gingrich; Samuel F. Gingrich
1973-01-01
Describes a procedure for identifying regional opportunities for accelerated timber management and demonstrates its application. Results provide a basis for rational choices among alternative management strategies and permit meaningful micro- and macro-evaluations of treatment response.
Combinations of response-reinforcer relations in periodic and aperiodic schedules.
Kuroda, Toshikazu; Cançado, Carlos R X; Lattal, Kennon A; Elcoro, Mirari; Dickson, Chata A; Cook, James E
2013-03-01
Key pecking of 4 pigeons was studied under a two-component multiple schedule in which food deliveries were arranged according to a fixed and a variable interfood interval. The percentage of response-dependent food in each component was varied, first in ascending (0, 10, 30, 70 and 100%) and then in descending orders, in successive conditions. The change in response rates was positively related to the percentage of response-dependent food in each schedule component. Across conditions, positively accelerated and linear patterns of responding occurred consistently in the fixed and variable components, respectively. These results suggest that the response-food dependency determines response rates in periodic and aperiodic schedules, and that the temporal distribution of food determines response patterns independently of the response-food dependency. Running rates, but not postfood pauses, also were positively related to the percentage of dependent food in each condition, in both fixed and variable components. Thus, the relation between overall response rate and the percentage of dependent food was mediated by responding that occurred after postfood pausing. The findings together extend previous studies wherein the dependency was either always present or absent, and increase the generality of the effects of variations in the response-food dependency from aperiodic to periodic schedules. © Society for the Experimental Analysis of Behavior.
Techniques for establishing schedules with wheel running as reinforcement in rats.
Iversen, I H
1993-07-01
In three experiments, access to wheel running was contingent on lever pressing. In each experiment, the duration of access to running was reduced gradually to 4, 5, or 6 s, and the schedule parameters were expanded gradually. The sessions lasted 2 hr. In Experiment 1, a fixed-ratio 20 schedule controlled a typical break-and-run pattern of lever pressing that was maintained throughout the session for 3 rats. In Experiment 2, a fixed-interval schedule of 6 min maintained lever pressing throughout the session for 3 rats, and for 1 rat, the rate of lever pressing was positively accelerated between reinforcements. In Experiment 3, a variable-ratio schedule of 20 or 35 was in effect and maintained lever pressing at a very stable pace throughout the session for 2 of 3 rats; for 1 rat, lever pressing was maintained at an irregular rate. When the session duration was extended to successive 24-hr periods, with food and water accessible in Experiment 3, lever pressing settled into a periodic pattern occurring at a high rate at approximately the same time each day. In each experiment, the rats that developed the highest local rates of running during wheel access also maintained the most stable and highest rates of lever pressing.
Levy, AnneMarie; Limebeer, Cheryl L.; Ferdinand, Justin; Shillingford, Ucal; Parker, Linda A.; Leri, Francesco
2014-01-01
This paper describes a novel method for studying the bio-behavioral basis of addiction to food. This method combines the surgical component of taste reactivity with the behavioral aspects of operant self-administration of drugs. Under very brief general anaesthesia, rats are implanted with an intraoral (IO) cannula that allows delivery of test solutions directly in the oral cavity. Animals are then tested in operant self-administration chambers whereby they can press a lever to receive IO infusions of test solutions. IO self-administration has several advantages over experimental procedures that involve drinking a solution from a spout or operant responding for solid pellets or solutions delivered in a receptacle. Here, we show that IO self-administration can be employed to study self-administration of high fructose corn syrup (HFCS). Rats were first tested for self-administration on a progressive ratio (PR) schedule, which assesses the maximum amount of operant behavior that will be emitted for different concentrations of HFCS (i.e. 8%, 25%, and 50%). Following this test, rats self-administered these concentrations on a continuous schedule of reinforcement (i.e. one infusion for each lever press) for 10 consecutive days (1 session/day; each lasting 3 hr), and then they were retested on the PR schedule. On the continuous reinforcement schedule, rats took fewer infusions of higher concentrations, although the lowest concentration of HFCS (8%) maintained more variable self-administration. Furthermore, the PR tests revealed that 8% had lower reinforcing value than 25% and 50%. These results indicate that IO self-administration can be employed to study acquisition and maintenance of responding for sweet solutions. The sensitivity of the operant response to differences in concentration and schedule of reinforcement makes IO self-administration an ideal procedure to investigate the neurobiology of voluntary intake of sweets. PMID:24561923
Behavioral regulation of gravity: schedule effects under escape-avoidance procedures1
Clark, Fogle C.; Lange, Karl O.; Belleville, Richard E.
1973-01-01
Squirrel monkeys were restrained in a centrifuge capsule and trained to escape and avoid increases in artificial gravity. During escape-avoidance, lever responses reduced centrifugally simulated gravity or postponed scheduled increases. The effect of variation in the interval of postponement (equal to the duration of decrease produced by escape responses) was studied under a multiple schedule of four components. Three components were gravity escape-avoidance with postponement times of 20, 40, and 60 sec. The fourth component was extinction. Each component was associated with a different auditory stimulus. Rate of responding decreased with increasing postponement time and higher mean g-levels occurred at shorter intervals of postponement. Effects of the schedule parameter on response rate and mean g-level were similar to effects of the schedule on free-operant avoidance and on titration behavior maintained by shock. ImagesFig. 1. PMID:4202386
An investigation of the use of temporal decomposition in space mission scheduling
NASA Technical Reports Server (NTRS)
Bullington, Stanley E.; Narayanan, Venkat
1994-01-01
This research involves an examination of techniques for solving scheduling problems in long-duration space missions. The mission timeline is broken up into several time segments, which are then scheduled incrementally. Three methods are presented for identifying the activities that are to be attempted within these segments. The first method is a mathematical model, which is presented primarily to illustrate the structure of the temporal decomposition problem. Since the mathematical model is bound to be computationally prohibitive for realistic problems, two heuristic assignment procedures are also presented. The first heuristic method is based on dispatching rules for activity selection, and the second heuristic assigns performances of a model evenly over timeline segments. These heuristics are tested using a sample Space Station mission and a Spacelab mission. The results are compared with those obtained by scheduling the missions without any problem decomposition. The applicability of this approach to large-scale mission scheduling problems is also discussed.
Green, L; Kagel, J H; Battalio, R C
1987-01-01
Pigeons' rates of responding and food reinforcement under simple random-ratio schedules were compared with those obtained under comparable ratio schedules in which free food deliveries were added, but the duration of each food delivery was halved. These ratio-with-free-food schedules were constructed so that, were the pigeon to maintain the same rate of responding as it had under the simple ratio schedule, total food obtained (earned plus free) would remain unchanged. However, any reduction in responding would reduce total food consumption below that under the simple ratio schedule. These "compensated wage decreases" led to decreases in responding and decreases in food consumption, as predicted by an economic model of labor supply. Moreover, the reductions in responding increased as the ratio value increased (i.e., as wage rates decreased). Pigeons, therefore, substituted leisure for consumption. The relationship between these procedures and negative-income-tax programs is noted.
Application of precomputed control laws in a reconfigurable aircraft flight control system
NASA Technical Reports Server (NTRS)
Moerder, Daniel D.; Halyo, Nesim; Broussard, John R.; Caglayan, Alper K.
1989-01-01
A self-repairing flight control system concept in which the control law is reconfigured after actuator and/or control surface damage to preserve stability and pilot command tracking is described. A key feature of the controller is reconfigurable multivariable feedback. The feedback gains are designed off-line and scheduled as a function of the aircraft control impairment status so that reconfiguration is performed simply by updating the gain schedule after detection of an impairment. A novel aspect of the gain schedule design procedure is that the schedule is calculated using a linear quadratic optimization-based simultaneous stabilization algorithm in which the scheduled gain is constrained to stabilize a collection of plant models representing the aircraft in various control failure modes. A description and numerical evaluation of a controller design for a model of a statically unstable high-performance aircraft are given.
NASA Technical Reports Server (NTRS)
Lallman, Frederick J.; Davidson, John B.; Murphy, Patrick C.
1998-01-01
A method, called pseudo controls, of integrating several airplane controls to achieve cooperative operation is presented. The method eliminates conflicting control motions, minimizes the number of feedback control gains, and reduces the complication of feedback gain schedules. The method is applied to the lateral/directional controls of a modified high-performance airplane. The airplane has a conventional set of aerodynamic controls, an experimental set of thrust-vectoring controls, and an experimental set of actuated forebody strakes. The experimental controls give the airplane additional control power for enhanced stability and maneuvering capabilities while flying over an expanded envelope, especially at high angles of attack. The flight controls are scheduled to generate independent body-axis control moments. These control moments are coordinated to produce stability-axis angular accelerations. Inertial coupling moments are compensated. Thrust-vectoring controls are engaged according to their effectiveness relative to that of the aerodynamic controls. Vane-relief logic removes steady and slowly varying commands from the thrust-vectoring controls to alleviate heating of the thrust turning devices. The actuated forebody strakes are engaged at high angles of attack. This report presents the forward-loop elements of a flight control system that positions the flight controls according to the desired stability-axis accelerations. This report does not include the generation of the required angular acceleration commands by means of pilot controls or the feedback of sensed airplane motions.
Evenden, John
2002-10-01
Psychosis and psychotomimetic drugs result in a disorganisation of the structure of thought and behaviour. Normalising these is one of the objects of antipsychotic therapy, and methods for predicting such a therapeutic effect would be of value. The effects of a number of psychotomimetic agents were examined on the way in which rats distributed responding over two response levers using two different procedures, to assay their effects on behavioural organisation. Previously, amphetamine has been found to increase response switching using these schedules. In the first, the random reinforcement procedure, one of the two levers was selected at random as "correct", and responses on this lever were reinforced with food under a random ratio schedule. No signal was given to distinguish the levers. Responding could also result in the food tray being illuminated, but no food pellet was delivered ("no-food" event). Responses on the second lever ("incorrect") had no programmed consequences. After each food delivery or "no-food" event the levers designated as "correct" and "incorrect" were reassigned at random, and the rat had to open the food tray to restart the schedule. In the second procedure, the rats were required to make 21 responses before a switch between the two levers resulted in food delivery [Fixed Ratio (FR) 21-switch]. The responses making up the FR could be distributed freely between the two levers. Phencyclidine (PCP), scopolamine, caffeine and ethanol increased switching under the random reinforcement procedure, but (+/-)-2,5-dimethoxy-4-iodoamphetamine hydrochloride (DOI) and atropine did not. PCP, caffeine, lysergic acid diethylamide (LSD) and atropine increased switching under the FR21-switch procedure, but ethanol did not. The increases in switching produced by PCP, LSD and the anticholinergics were accompanied by marked reductions in response rate, whereas those produced by amphetamine and caffeine were not. The effects of amphetamine, and PCP were strongly dependent on the baseline probability of switching, those of atropine and caffeine moderately so, and those of LSD and ethanol only weakly so. Of the agents tested, psychomotor stimulants appear to produce the most selective increases in switching. The procedures described here may be useful for assaying the disorganisation of behaviour produced by other psychotomimetics and may have value in the detection of novel antipsychotic drugs.
Caesar, Ulla; Karlsson, Jon; Hansson, Elisabeth
2018-01-01
Emergency surgery is unplanned by definition and patients are scheduled for surgery with minimal preparation. Some patients who have sustained emergency orthopaedic trauma or other conditions must be operated on immediately or within a few hours, while others can wait until the hospital's resources permit and/or the patients' health status has been optimised as needed. This may affect the prioritisation procedures for both emergency and elective surgery and might result in waiting lists, not only for planned procedures but also for emergencies. The main purpose of this retrospective, observational, single-centre study was to evaluate and describe for the number and reasons of delays, as well as waiting times in emergency orthopaedic surgery using data derived from the hospital's records and registers. All the emergency patients scheduled for emergency surgery whose procedures were rescheduled and delayed between 1 January 2007 and 31 December 2013 were studied. We found that 24% (8474) of the 36,017 patients scheduled for emergency surgeries were delayed and rescheduled at least once, some several times. Eighty per cent of these delays were due to organisational causes. Twenty-one per cent of all the delayed patients had surgery within 24 h, whilst 41% waited for more than 24 h, up to 3 days. A large number of the clinic's emergency orthopaedic procedures were rescheduled and delayed and the majority of the delays were related to organisational reasons. The results can be interpreted in two ways; first, organisational reasons are avoidable and the potential for improvement is great and, secondly and most importantly, the delays might negatively affect patient outcomes.
Boucaud-Maitre, Denis; Altman, Jean-Jacques
2016-10-01
The Food and Drug Administration (FDA) and the European Medicines Agency (EMA) have both implemented procedures in order to shorten review time for marketing authorizations with potential therapeutic added value, called priority review and accelerated assessment procedure, respectively. The aim of this study is to compare the new molecular entities (NME) assessed in shorter review time by both agencies and to investigate whether granting a shorter review time status subsequently predicts its therapeutic value attributed by a health technology assessment agency, the French Haute Autorité de Santé (HAS). All NME approved by the EMA and the FDA with a therapeutic added value between 2007 and June 30, 2015 were extracted. We assessed the sensibility, the positive predictive value, and the EMA review time. One hundred seventy-eight NME were approved by the FDA and the EMA and a therapeutic value was available for 160 NME. Eighty-eight (55.0 %) NME were on FDA priority review, 24 (15.0 %) on EMA accelerated procedure and 43 (26.9 %) were considered of high clinical added value. The sensibility was 86.0 % for the FDA and 30.2 % for the EMA. The positive predictive value was, respectively, 42.0 and 54.2 %. Twenty-five NME on FDA priority review and of high therapeutic added value were not on EMA accelerated assessment procedure, leading to a supplementary mean EMA review time of 146 days. The EMA was restrictive to grant a shorten review time status for products with therapeutic interest during the study period.
A derived heuristics based multi-objective optimization procedure for micro-grid scheduling
NASA Astrophysics Data System (ADS)
Li, Xin; Deb, Kalyanmoy; Fang, Yanjun
2017-06-01
With the availability of different types of power generators to be used in an electric micro-grid system, their operation scheduling as the load demand changes with time becomes an important task. Besides satisfying load balance constraints and the generator's rated power, several other practicalities, such as limited availability of grid power and restricted ramping of power output from generators, must all be considered during the operation scheduling process, which makes it difficult to decide whether the optimization results are accurate and satisfactory. In solving such complex practical problems, heuristics-based customized optimization algorithms are suggested. However, due to nonlinear and complex interactions of variables, it is difficult to come up with heuristics in such problems off-hand. In this article, a two-step strategy is proposed in which the first task deciphers important heuristics about the problem and the second task utilizes the derived heuristics to solve the original problem in a computationally fast manner. Specifically, the specific operation scheduling is considered from a two-objective (cost and emission) point of view. The first task develops basic and advanced level knowledge bases offline from a series of prior demand-wise optimization runs and then the second task utilizes them to modify optimized solutions in an application scenario. Results on island and grid connected modes and several pragmatic formulations of the micro-grid operation scheduling problem clearly indicate the merit of the proposed two-step procedure.
Collaborative Resource Allocation
NASA Technical Reports Server (NTRS)
Wang, Yeou-Fang; Wax, Allan; Lam, Raymond; Baldwin, John; Borden, Chester
2007-01-01
Collaborative Resource Allocation Networking Environment (CRANE) Version 0.5 is a prototype created to prove the newest concept of using a distributed environment to schedule Deep Space Network (DSN) antenna times in a collaborative fashion. This program is for all space-flight and terrestrial science project users and DSN schedulers to perform scheduling activities and conflict resolution, both synchronously and asynchronously. Project schedulers can, for the first time, participate directly in scheduling their tracking times into the official DSN schedule, and negotiate directly with other projects in an integrated scheduling system. A master schedule covers long-range, mid-range, near-real-time, and real-time scheduling time frames all in one, rather than the current method of separate functions that are supported by different processes and tools. CRANE also provides private workspaces (both dynamic and static), data sharing, scenario management, user control, rapid messaging (based on Java Message Service), data/time synchronization, workflow management, notification (including emails), conflict checking, and a linkage to a schedule generation engine. The data structure with corresponding database design combines object trees with multiple associated mortal instances and relational database to provide unprecedented traceability and simplify the existing DSN XML schedule representation. These technologies are used to provide traceability, schedule negotiation, conflict resolution, and load forecasting from real-time operations to long-range loading analysis up to 20 years in the future. CRANE includes a database, a stored procedure layer, an agent-based middle tier, a Web service wrapper, a Windows Integrated Analysis Environment (IAE), a Java application, and a Web page interface.
Programming and Runtime Support to Blaze FPGA Accelerator Deployment at Datacenter Scale
Huang, Muhuan; Wu, Di; Yu, Cody Hao; Fang, Zhenman; Interlandi, Matteo; Condie, Tyson; Cong, Jason
2017-01-01
With the end of CPU core scaling due to dark silicon limitations, customized accelerators on FPGAs have gained increased attention in modern datacenters due to their lower power, high performance and energy efficiency. Evidenced by Microsoft’s FPGA deployment in its Bing search engine and Intel’s 16.7 billion acquisition of Altera, integrating FPGAs into datacenters is considered one of the most promising approaches to sustain future datacenter growth. However, it is quite challenging for existing big data computing systems—like Apache Spark and Hadoop—to access the performance and energy benefits of FPGA accelerators. In this paper we design and implement Blaze to provide programming and runtime support for enabling easy and efficient deployments of FPGA accelerators in datacenters. In particular, Blaze abstracts FPGA accelerators as a service (FaaS) and provides a set of clean programming APIs for big data processing applications to easily utilize those accelerators. Our Blaze runtime implements an FaaS framework to efficiently share FPGA accelerators among multiple heterogeneous threads on a single node, and extends Hadoop YARN with accelerator-centric scheduling to efficiently share them among multiple computing tasks in the cluster. Experimental results using four representative big data applications demonstrate that Blaze greatly reduces the programming efforts to access FPGA accelerators in systems like Apache Spark and YARN, and improves the system throughput by 1.7 × to 3× (and energy efficiency by 1.5× to 2.7×) compared to a conventional CPU-only cluster. PMID:28317049
Programming and Runtime Support to Blaze FPGA Accelerator Deployment at Datacenter Scale.
Huang, Muhuan; Wu, Di; Yu, Cody Hao; Fang, Zhenman; Interlandi, Matteo; Condie, Tyson; Cong, Jason
2016-10-01
With the end of CPU core scaling due to dark silicon limitations, customized accelerators on FPGAs have gained increased attention in modern datacenters due to their lower power, high performance and energy efficiency. Evidenced by Microsoft's FPGA deployment in its Bing search engine and Intel's 16.7 billion acquisition of Altera, integrating FPGAs into datacenters is considered one of the most promising approaches to sustain future datacenter growth. However, it is quite challenging for existing big data computing systems-like Apache Spark and Hadoop-to access the performance and energy benefits of FPGA accelerators. In this paper we design and implement Blaze to provide programming and runtime support for enabling easy and efficient deployments of FPGA accelerators in datacenters. In particular, Blaze abstracts FPGA accelerators as a service (FaaS) and provides a set of clean programming APIs for big data processing applications to easily utilize those accelerators. Our Blaze runtime implements an FaaS framework to efficiently share FPGA accelerators among multiple heterogeneous threads on a single node, and extends Hadoop YARN with accelerator-centric scheduling to efficiently share them among multiple computing tasks in the cluster. Experimental results using four representative big data applications demonstrate that Blaze greatly reduces the programming efforts to access FPGA accelerators in systems like Apache Spark and YARN, and improves the system throughput by 1.7 × to 3× (and energy efficiency by 1.5× to 2.7×) compared to a conventional CPU-only cluster.
Yates, Justin R; Breitenstein, Kerry A; Gunkel, Benjamin T; Hughes, Mallory N; Johnson, Anthony B; Rogers, Katherine K; Shape, Sara M
Risky decision making can be measured using a probability-discounting procedure, in which animals choose between a small, certain reinforcer and a large, uncertain reinforcer. Recent evidence has identified glutamate as a mediator of risky decision making, as blocking the N-methyl-d-aspartate (NMDA) receptor with MK-801 increases preference for a large, uncertain reinforcer. Because the order in which probabilities associated with the large reinforcer can modulate the effects of drugs on choice, the current study determined if NMDA receptor ligands alter probability discounting using ascending and descending schedules. Sixteen rats were trained in a probability-discounting procedure in which the odds against obtaining the large reinforcer increased (n=8) or decreased (n=8) across blocks of trials. Following behavioral training, rats received treatments of the NMDA receptor ligands MK-801 (uncompetitive antagonist; 0, 0.003, 0.01, or 0.03mg/kg), ketamine (uncompetitive antagonist; 0, 1.0, 5.0, or 10.0mg/kg), and ifenprodil (NR2B-selective non-competitive antagonist; 0, 1.0, 3.0, or 10.0mg/kg). Results showed discounting was steeper (indicating increased risk aversion) for rats on an ascending schedule relative to rats on the descending schedule. Furthermore, the effects of MK-801, ketamine, and ifenprodil on discounting were dependent on the schedule used. Specifically, the highest dose of each drug decreased risk taking in rats in the descending schedule, but only MK-801 (0.03mg/kg) increased risk taking in rats on an ascending schedule. These results show that probability presentation order modulates the effects of NMDA receptor ligands on risky decision making. Copyright © 2016 Elsevier Inc. All rights reserved.
Verma, Akash; Lee, Mui Yok; Wang, Chunhong; Hussein, Nurmalah B M; Selvi, Kalai; Tee, Augustine
2014-04-01
The purpose of this study was to assess the efficiency of performing pulmonary procedures in the endoscopy unit in a large teaching hospital. A prospective study from May 20 to July 19, 2013, was designed. The main outcome measures were procedure delays and their reasons, duration of procedural steps starting from patient's arrival to endoscopy unit, turnaround time, total case durations, and procedure wait time. A total of 65 procedures were observed. The most common procedure was BAL (61%) followed by TBLB (31%). Overall procedures for 35 (53.8%) of 65 patients were delayed by ≥ 30 minutes, 21/35 (60%) because of "spillover" of the gastrointestinal and surgical cases into the time block of pulmonary procedure. Time elapsed between end of pulmonary procedure and start of the next procedure was ≥ 30 minutes in 8/51 (16%) of cases. In 18/51 (35%) patients there was no next case in the room after completion of the pulmonary procedure. The average idle time of the room after the end of pulmonary procedure and start of next case or end of shift at 5:00 PM if no next case was 58 ± 53 minutes. In 17/51 (33%) patients the room's idle time was >60 minutes. A total of 52.3% of patients had the wait time >2 days and 11% had it ≥ 6 days, reason in 15/21 (71%) being unavailability of the slot. Most pulmonary procedures were delayed due to spillover of the gastrointestinal and surgical cases into the block time allocated to pulmonary procedures. The most common reason for difficulty encountered in scheduling the pulmonary procedure was slot unavailability. This caused increased procedure waiting time. The strategies to reduce procedure delays and turnaround times, along with improved scheduling methods, may have a favorable impact on the volume of procedures performed in the unit thereby optimizing the existing resources.
Influence of Temporal Context on Value in the Multiple-Chains and Successive-Encounters Procedures
ERIC Educational Resources Information Center
O'Daly, Matthew; Angulo, Samuel; Gipson, Cassandra; Fantino, Edmund
2006-01-01
This set of studies explored the influence of temporal context across multiple-chain and multiple-successive-encounters procedures. Following training with different temporal contexts, the value of stimuli sharing similar reinforcement schedules was assessed by presenting these stimuli in concurrent probes. The results for the multiple-chain…
Development of an Observational Procedure for Assessment of Parent-Child Interaction.
ERIC Educational Resources Information Center
Cunningham, Jo Lynn; Boger, Robert P.
The feasibility of using an observational rating schedule to elicit information about parent-child interaction was studied. The Parent-Child Interaction Rating Procedure (P-CIRP), focusing specifically on parent-child interaction with a structured teaching task, was developed for this purpose. The interaction setting is teaching the child simple…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-25
...This document announces the procedures and minimum opening bids for the upcoming auction of licenses in the lower and upper paging bands (Auction 95). This document is intended to familiarize prospective applicants with the procedures and other requirements for participation in the auction.
23 CFR 669.21 - Procedure for evaluating state compliance.
Code of Federal Regulations, 2010 CFR
2010-04-01
... automated file as evidence that proof of payment has been received before vehicles subject to the Federal... TRAFFIC OPERATIONS ENFORCEMENT OF HEAVY VEHICLE USE TAX § 669.21 Procedure for evaluating state compliance.... In lieu of retention of Schedule 1, states may make an appropriate entry in an automated file or on...
Amirghasemi, Mehrdad; Zamani, Reza
2014-01-01
This paper presents an effective procedure for solving the job shop problem. Synergistically combining small and large neighborhood schemes, the procedure consists of four components, namely (i) a construction method for generating semi-active schedules by a forward-backward mechanism, (ii) a local search for manipulating a small neighborhood structure guided by a tabu list, (iii) a feedback-based mechanism for perturbing the solutions generated, and (iv) a very large-neighborhood local search guided by a forward-backward shifting bottleneck method. The combination of shifting bottleneck mechanism and tabu list is used as a means of the manipulation of neighborhood structures, and the perturbation mechanism employed diversifies the search. A feedback mechanism, called repeat-check, detects consequent repeats and ignites a perturbation when the total number of consecutive repeats for two identical makespan values reaches a given threshold. The results of extensive computational experiments on the benchmark instances indicate that the combination of these four components is synergetic, in the sense that they collectively make the procedure fast and robust.
Filipovic, Nenad D.
2017-01-01
Image segmentation is one of the most common procedures in medical imaging applications. It is also a very important task in breast cancer detection. Breast cancer detection procedure based on mammography can be divided into several stages. The first stage is the extraction of the region of interest from a breast image, followed by the identification of suspicious mass regions, their classification, and comparison with the existing image database. It is often the case that already existing image databases have large sets of data whose processing requires a lot of time, and thus the acceleration of each of the processing stages in breast cancer detection is a very important issue. In this paper, the implementation of the already existing algorithm for region-of-interest based image segmentation for mammogram images on High-Performance Reconfigurable Dataflow Computers (HPRDCs) is proposed. As a dataflow engine (DFE) of such HPRDC, Maxeler's acceleration card is used. The experiments for examining the acceleration of that algorithm on the Reconfigurable Dataflow Computers (RDCs) are performed with two types of mammogram images with different resolutions. There were, also, several DFE configurations and each of them gave a different acceleration value of algorithm execution. Those acceleration values are presented and experimental results showed good acceleration. PMID:28611851
Milankovic, Ivan L; Mijailovic, Nikola V; Filipovic, Nenad D; Peulic, Aleksandar S
2017-01-01
Image segmentation is one of the most common procedures in medical imaging applications. It is also a very important task in breast cancer detection. Breast cancer detection procedure based on mammography can be divided into several stages. The first stage is the extraction of the region of interest from a breast image, followed by the identification of suspicious mass regions, their classification, and comparison with the existing image database. It is often the case that already existing image databases have large sets of data whose processing requires a lot of time, and thus the acceleration of each of the processing stages in breast cancer detection is a very important issue. In this paper, the implementation of the already existing algorithm for region-of-interest based image segmentation for mammogram images on High-Performance Reconfigurable Dataflow Computers (HPRDCs) is proposed. As a dataflow engine (DFE) of such HPRDC, Maxeler's acceleration card is used. The experiments for examining the acceleration of that algorithm on the Reconfigurable Dataflow Computers (RDCs) are performed with two types of mammogram images with different resolutions. There were, also, several DFE configurations and each of them gave a different acceleration value of algorithm execution. Those acceleration values are presented and experimental results showed good acceleration.
Soremekun, Olan A; Zane, Richard D; Walls, Andrew; Allen, Matthew B; Seefeld, Kimberly J; Pallin, Daniel J
2011-06-01
The ability to generate hospital beds in response to a mass-casualty incident is an essential component of public health preparedness. Although many acute care hospitals' emergency response plans include some provision for delaying or cancelling elective procedures in the event of an inpatient surge, no standardized method for implementing and quantifying the impact of this strategy exists in the literature. The aim of this study was to develop a methodology to prospectively emergency plan for implementing a strategy of delaying procedures and quantifying the potential impact of this strategy on creating hospital bed capacity. This is a pilot study. A categorization methodology was devised and applied retrospectively to all scheduled procedures during four one-week periods chosen by convenience. The categorization scheme grouped procedures into four categories: (A) procedures with no impact on inpatient capacity; (B) procedures that could be delayed indefinitely; (C) procedures that could be delayed by one week; and (D) procedures that could not be delayed. The categorization scheme was applied by two research assistants and an emergency medicine resident. All three raters categorized the first 100 cases to allow for calculation of inter-rater reliability. Maximal hospital bed capacity was defined as the 95th percentile weekday occupancy, as this is more representative of functional bed capacity than is the number of licensed beds. The main outcome was the number of hospital beds that could be created by postponing procedures in categories B and C. Maximal hospital bed capacity was 816 beds. Mean occupancy during weekdays was 759 versus 694 on weekends. By postponing Group B and C procedures, a mean of 60 beds (51 general medical/surgical and nine intensive care unit (ICU)) could be created on weekdays, and four beds (three general medical/surgical and one ICU) on weekends. This represents 7.3% and 0.49% of maximal hospital bed capacity and ICU capacity, respectively. In the event that sustained surge is needed, delaying all category B and C procedures for one week would lead to the generation of 1,235 hospital-bed days. Inter-rater reliability was high (kappa = 0.74) indicating good agreement between all three raters. For the institution studied, the strategy of delaying scheduled procedures could generate inpatient capacity with maximal impact during weekdays and little impact on weekends. Future research is needed to validate the categorization scheme and increase the ability to predict inpatient surge capacity across various hospital types and sizes.
Surgical scheduling: a lean approach to process improvement.
Simon, Ross William; Canacari, Elena G
2014-01-01
A large teaching hospital in the northeast United States had an inefficient, paper-based process for scheduling orthopedic surgery that caused delays and contributed to site/side discrepancies. The hospital's leaders formed a team with the goals of developing a safe, effective, patient-centered, timely, efficient, and accurate orthopedic scheduling process; smoothing the schedule so that block time was allocated more evenly; and ensuring correct site/side. Under the resulting process, real-time patient information is entered into a database during the patient's preoperative visit in the surgeon's office. The team found the new process reduced the occurrence of site/side discrepancies to zero, reduced instances of changing the sequence of orthopedic procedures by 70%, and increased patient satisfaction. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.
Global effects of accelerated tariff liberalization in the forest products sector to 2010.
Shushuai Zhu; Joseph Buongiorno; David J. Brooks
2002-01-01
This study projects the effects of tariff elimination on the world sector. Projections were done for two scenarios: (1) progressive tariff elimination according to the schedule agreed to under the current General Agreement on Tariff or Trade (GATT) and (2) complete elimination of tariff on wood products as proposed within the Asia-Pacific Economic Cooperation (APEC)...
2001-06-05
KENNEDY SPACE CENTER, Fla. -- The High Energy Solar Spectroscopic Imager (HESSI) spacecraft, which will be launched by a Pegasus XL rocket, arrives at the Skid Strip at Cape Canaveral Air Force Station. Part of NASA's Small Explorer Program, HESSI's primary mission is to explore the basic physics of particle acceleration and explosive energy release in solar flares. Launch is scheduled for no earlier than June 14
2002-02-01
KENNEDY SPACE CENTER, FLA. -- This closeup shows the Pegasus XL rocket with the High Energy Solar Spectroscopic Imager (HESSI) attached at its top, on the right. The Pegasus will launch HESSI to explore the basic physics of particle acceleration and energy release in solar flares. The launch is scheduled for Feb. 5, 2002, from beneath the Orbital Sciences Corp. L-1011 aircraft seen here
78 FR 70477 - Federal Acquisition Regulation; Accelerated Payments to Small Business Subcontractors
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-25
... SPACE ADMINISTRATION 48 CFR Parts 12, 32, and 52 [FAC 2005-71; FAR Case 2012-031; Item I; Docket No... Office of Management and Budget (OMB) Memoranda M-12-16, dated July 11, 2012, and M-13-15, dated July 11... publication schedules, contact the Regulatory Secretariat at 202-501-4755. Please cite FAC 2005-71, FAR Case...
Guan, W; Meng, X F; Dong, X M
2014-12-01
Rectification error is a critical characteristic of inertial accelerometers. Accelerometers working in operational situations are stimulated by composite inputs, including constant acceleration and vibration, from multiple directions. However, traditional methods for evaluating rectification error only use one-dimensional vibration. In this paper, a double turntable centrifuge (DTC) was utilized to produce the constant acceleration and vibration simultaneously and we tested the rectification error due to the composite accelerations. At first, we deduced the expression of the rectification error with the output of the DTC and a static model of the single-axis pendulous accelerometer under test. Theoretical investigation and analysis were carried out in accordance with the rectification error model. Then a detailed experimental procedure and testing results were described. We measured the rectification error with various constant accelerations at different frequencies and amplitudes of the vibration. The experimental results showed the distinguished characteristics of the rectification error caused by the composite accelerations. The linear relation between the constant acceleration and the rectification error was proved. The experimental procedure and results presented in this context can be referenced for the investigation of the characteristics of accelerometer with multiple inputs.
Ultrafast superpixel segmentation of large 3D medical datasets
NASA Astrophysics Data System (ADS)
Leblond, Antoine; Kauffmann, Claude
2016-03-01
Even with recent hardware improvements, superpixel segmentation of large 3D medical images at interactive speed (<500 ms) remains a challenge. We will describe methods to achieve such performances using a GPU based hybrid framework implementing wavefront propagation and cellular automata resolution. Tasks will be scheduled in blocks (work units) using a wavefront propagation strategy, therefore allowing sparse scheduling. Because work units has been designed as spatially cohesive, the fast Thread Group Shared Memory can be used and reused through a Gauss-Seidel like acceleration. The work unit partitioning scheme will however vary on odd- and even-numbered iterations to reduce convergence barriers. Synchronization will be ensured by an 8-step 3D variant of the traditional Red Black Ordering scheme. An attack model and early termination will also be described and implemented as additional acceleration techniques. Using our hybrid framework and typical operating parameters, we were able to compute the superpixels of a high-resolution 512x512x512 aortic angioCT scan in 283 ms using a AMD R9 290X GPU. We achieved a 22.3X speed-up factor compared to the published reference GPU implementation.
NASA Technical Reports Server (NTRS)
Wingate, R. T.; Jones, T. C.; Stephens, M. V.
1973-01-01
The description of a transient analysis program for computing structural responses to input base accelerations is presented. A hybrid modal formulation is used and a procedure is demonstrated for generating and writing all modal input data on user tapes via NASTRAN. Use of several new Level 15 modules is illustrated along with a problem associated with reading the postprocessor program input from a user tape. An example application of the program is presented for the analysis of a spacecraft subjected to accelerations initiated by thrust transients. Experience with the program has indicated it to be very efficient and economical because of its simplicity and small central memory storage requirements.
1997-06-28
STS-94 Pilot Susan Leigh Still arrives at the Shuttle Landing Facility aboard a T-38 jet in preparation for the reflight of the Microgravity Science Laboratory-1 mission. Launch is scheduled for July 1, 1997, at 2:37 p.m. EDT. The laboratory was scheduled to fly again with the full complement of STS-83 experiments after that mission was cut short due to a faulty fuel cell. During the scheduled 16-day STS-94 mission, the experiments will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the flight crew conducts combustion, protein crystal growth and materials processing experiments
1997-06-28
STS-94 Commander James D. Halsell, Jr., arrives at the Shuttle Landing Facility aboard a T-38 jet in preparation for the reflight of the Microgravity Science Laboratory-1 mission. Launch is scheduled for July 1, 1997, at 2:37 p.m. EDT. The laboratory was scheduled to fly again with the full complement of STS-83 experiments after that mission was cut short due to a faulty fuel cell. During the scheduled 16-day STS-94 mission, the experiments will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the flight crew conducts combustion, protein crystal growth and materials processing experiments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cartmell, D.B.
1995-09-01
Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The Kmore » Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.« less
A pervasive parallel framework for visualization: final report for FWP 10-014707
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moreland, Kenneth D.
2014-01-01
We are on the threshold of a transformative change in the basic architecture of highperformance computing. The use of accelerator processors, characterized by large core counts, shared but asymmetrical memory, and heavy thread loading, is quickly becoming the norm in high performance computing. These accelerators represent significant challenges in updating our existing base of software. An intrinsic problem with this transition is a fundamental programming shift from message passing processes to much more fine thread scheduling with memory sharing. Another problem is the lack of stability in accelerator implementation; processor and compiler technology is currently changing rapidly. This report documentsmore » the results of our three-year ASCR project to address these challenges. Our project includes the development of the Dax toolkit, which contains the beginnings of new algorithms for a new generation of computers and the underlying infrastructure to rapidly prototype and build further algorithms as necessary.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Katayama, T.
On the basis of the achievement of the accelerator studies at present TARN, it is decided to construct the new ring TARN II which will be operated as an accumulator, accelerator, cooler and stretcher. It has the maximum magnetic rigidity of 7 Txm corresponding to the proton energy 1.3 GeV and the ring diameter is around 23 m. Light and heavy ions from the SF cyclotron will be injected and accelerated to the working energy where the ring will be operated as a desired mode, for example a cooler ring mode. At the cooler ring operation, the strong cooling devicesmore » such as stochastic and electron beam coolings will work together with the internal gas jet target for the precise nuclear experiments. TARN II is currently under the contruction with the schedule of completion in 1986. In this paper general features of the project are presented.« less
NASA Technical Reports Server (NTRS)
Ghaffarian, Reza; Evans, John W.
2014-01-01
For five decades, the semiconductor industry has distinguished itself by the rapid pace of improvement in miniaturization of electronics products-Moore's Law. Now, scaling hits a brick wall, a paradigm shift. The industry roadmaps recognized the scaling limitation and project that packaging technologies will meet further miniaturization needs or ak.a "More than Moore". This paper presents packaging technology trends and accelerated reliability testing methods currently being practiced. Then, it presents industry status on key advanced electronic packages, factors affecting accelerated solder joint reliability of area array packages, and IPC/JEDEC/Mil specifications for characterizations of assemblies under accelerated thermal and mechanical loading. Finally, it presents an examples demonstrating how Accelerated Testing and Analysis have been effectively employed in the development of complex spacecraft thereby reducing risk. Quantitative assessments necessarily involve the mathematics of probability and statistics. In addition, accelerated tests need to be designed which consider the desired risk posture and schedule for particular project. Such assessments relieve risks without imposing additional costs. and constraints that are not value added for a particular mission. Furthermore, in the course of development of complex systems, variances and defects will inevitably present themselves and require a decision concerning their disposition, necessitating quantitative assessments. In summary, this paper presents a comprehensive view point, from technology to systems, including the benefits and impact of accelerated testing in offsetting risk.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Castellano, T.; De Palma, L.; Laneve, D.
2015-07-01
A homemade computer code for designing a Side- Coupled Linear Accelerator (SCL) is written. It integrates a simplified model of SCL tanks with the Particle Swarm Optimization (PSO) algorithm. The computer code main aim is to obtain useful guidelines for the design of Linear Accelerator (LINAC) resonant cavities. The design procedure, assisted via the aforesaid approach seems very promising, allowing future improvements towards the optimization of actual accelerating geometries. (authors)
Applying Resource Based Relative Value Scales (RBRVS) to the Champus Program
1990-12-01
fee for the related service .[Ref. 6:p. 7] F. EFFECTS OF RBRVS When a Medicare fee schedule is fully implemented, several Important...reimbursement rates increase would be attracted to CHAMPUS. In analyzing the impact of a resource based fee schedule on the Medicare program, the PPRC...procedures performed by physicians into components of work, training costs, and practice costs. The Medicare program is planning to implement a fee
Exploiting loop level parallelism in nonprocedural dataflow programs
NASA Technical Reports Server (NTRS)
Gokhale, Maya B.
1987-01-01
Discussed are how loop level parallelism is detected in a nonprocedural dataflow program, and how a procedural program with concurrent loops is scheduled. Also discussed is a program restructuring technique which may be applied to recursive equations so that concurrent loops may be generated for a seemingly iterative computation. A compiler which generates C code for the language described below has been implemented. The scheduling component of the compiler and the restructuring transformation are described.
Assessment of Delivery Accuracy in an Operational-Like Environment
NASA Technical Reports Server (NTRS)
Sharma, Shivanjli; Wynnyk, Mitch
2016-01-01
In order to enable arrival management concepts and solutions in a Next Generation Air Transportation System (NextGen) environment, ground-based sequencing and scheduling functions were developed to support metering operations in the National Airspace System. These sequencing and scheduling tools are designed to assist air traffic controllers in developing an overall arrival strategy, from enroute down to the terminal area boundary. NASA developed a ground system concept and protoype capability called Terminal Sequencing and Spacing (TSAS) to extend metering operations into the terminal area to the runway. To demonstrate the use of these scheduling and spacing tools in an operational-like environment, the FAA, NASA, and MITRE conducted an Operational Integration Assessment (OIA) of a prototype TSAS system at the FAA's William J. Hughes Technical Center (WJHTC). This paper presents an analysis of the arrival management strategies utilized and delivery accuracy achieved during the OIA. The analysis demonstrates how en route preconditioning, in various forms, and schedule disruptions impact delivery accuracy. As the simulation spanned both enroute and terminal airspace, the use of Ground Interval Management - Spacing (GIM-S) enroute speed advisories was investigated. Delivery accuracy was measured as the difference between the Scheduled Time of Arrival (STA) and the Actual Time of Arrival (ATA). The delivery accuracy was computed across all runs conducted during the OIA, which included deviations from nominal operations which are known to commonly occur in real operations, such as schedule changes and missed approaches. Overall, 83% of all flights were delivered into the terminal airspace within +/- 30 seconds of their STA and 94% of flights were delivered within +/- 60 seconds. The meter fix delivery accuracy standard deviation was found to be between 36 and 55 seconds across all arrival procedures. The data also showed when schedule disruptions were excluded, the percentage of aircraft delivered within +/- 30 seconds was between 85 and 90% across the various arrival procedures at the meter fix. This paper illustrates the ability to meet new delivery accuracy requirements in an operational-like environment using operational systems and NATCA controller participants, while also including common events that might cause disruptions to the schedule and overall system.
A half century of scalloping in the work habits of the United States Congress.
Critchfield, Thomas S; Haley, Rebecca; Sabo, Benjamin; Colbert, Jorie; Macropoulis, Georgette
2003-01-01
It has been suggested that the work environment of the United States Congress bears similarity to a fixed-interval reinforcement schedule. Consistent with this notion, Weisberg and Waldrop (1972) described a positively accelerating pattern in annual congressional bill production (selected years from 1947 to 1968) that is reminiscent of the scalloped response pattern often attributed to fixed-interval schedules, but their analysis is now dated and does not bear on the functional relations that might yield scalloping. The present study described annual congressional bill production over a period of 52 years and empirically evaluated predictions derived from four hypotheses about the mechanisms that underlie scalloping. Scalloping occurred reliably in every year. The data supported several predictions about congressional productivity based on fixed-interval schedule performance, but did not consistently support any of three alternative accounts. These findings argue for the external validity of schedule-controlled operant behavior as measured in the laboratory. The present analysis also illustrates a largely overlooked role for applied behavior analysis: that of shedding light on the functional properties of behavior in uncontrolled settings of considerable interest to the public. PMID:14768667
Paratransit Vehicle Test and Evaluation : Volume 2. Acceleration and Interior Measurement Tests.
DOT National Transportation Integrated Search
1978-06-01
A series of tests and evaluations of two prototype vehicles for paratransit were conducted. This volume (Volume II) presents the test procedure and results of the acceleration and interior measurement test series. The tests determined the acceleratio...
Embedded Streaming Deep Neural Networks Accelerator With Applications.
Dundar, Aysegul; Jin, Jonghoon; Martini, Berin; Culurciello, Eugenio
2017-07-01
Deep convolutional neural networks (DCNNs) have become a very powerful tool in visual perception. DCNNs have applications in autonomous robots, security systems, mobile phones, and automobiles, where high throughput of the feedforward evaluation phase and power efficiency are important. Because of this increased usage, many field-programmable gate array (FPGA)-based accelerators have been proposed. In this paper, we present an optimized streaming method for DCNNs' hardware accelerator on an embedded platform. The streaming method acts as a compiler, transforming a high-level representation of DCNNs into operation codes to execute applications in a hardware accelerator. The proposed method utilizes maximum computational resources available based on a novel-scheduled routing topology that combines data reuse and data concatenation. It is tested with a hardware accelerator implemented on the Xilinx Kintex-7 XC7K325T FPGA. The system fully explores weight-level and node-level parallelizations of DCNNs and achieves a peak performance of 247 G-ops while consuming less than 4 W of power. We test our system with applications on object classification and object detection in real-world scenarios. Our results indicate high-performance efficiency, outperforming all other presented platforms while running these applications.
NASA Technical Reports Server (NTRS)
Whorton, Mark; Perkins, Brad T.
2000-01-01
For many microgravity science experiments in the International Space Station, the ambient acceleration environment will be exceed desirable levels. To provide a more quiescent acceleration environment to the microgravity payloads, a vibration isolation system named g-LIMIT (GLovebox Integrated Microgravity Isolation Technology) is being designed. g-LIMIT is a sub-rack level isolation system that can be tailored to a variety of applications. Scheduled for launch on the UF-1 mission, the initial implementation of g-LIMIT will be a Characterization Test in the Microgravity Science Glovebox (MSG). g-LIMIT will be available to glovebox investigators immediately after characterization testing. Standard MSG structural and umbilical interfaces will be used so that the isolation mount is transparent to the user with no additional accommodation requirements. g-LIMIT consists of three integrated isolator modules, each of which is comprised of a dual axis actuator, two axes of acceleration sensing, two axes of position sensing, control electronics, and data transmission capabilities in a minimum-volume package. In addition, this system provides the unique capability for measuring absolute acceleration of the experiment independent of accelerometers as a by-product of the control system and will have the capability of generating pristine accelerations to enhance experiment operations.
The g-LIMIT Microgravity Vibration Isolation System for the Microgravity Science Glovebox
NASA Technical Reports Server (NTRS)
Whorton, Mark S.; Ryan, Stephen G. (Technical Monitor)
2001-01-01
For many microgravity science experiments in the International Space Station, the ambient acceleration environment will be exceed desirable levels. To provide a more quiescent acceleration environment to the microgravity payloads, a vibration isolation system named g-LIMIT (GLovebox Integrated Microgravity Isolation Technology) is being designed. g-LIMIT is a sub-rack level isolation system for the Microgravity Science Glovebox that can be tailored to a variety of applications. Scheduled for launch on the UF-1 mission, the initial implementation of g-LIMIT will be a Characterization Test in the Microgravity Science Glovebox. g-LIMIT will be available to glovebox investigators immediately after characterization testing. Standard MSG structural and umbilical interfaces will be used so that the interface requirements are minimized. g-LIMIT consists of three integrated isolator modules, each of which is comprised of a dual axis actuator, two axes of acceleration sensing, two axes of position sensing, control electronics, and data transmission capabilities in a small-volume package. In addition, this system provides the unique capability for measuring quasi-steady acceleration of the experiment independent of accelerometers as a by-product of the control system and will have the capability of generating user-specified pristine accelerations to enhance experiment operations.
Work schedules and 11-year progression of carotid atherosclerosis in middle-aged Finnish men.
Wang, Aolin; Arah, Onyebuchi A; Kauhanen, Jussi; Krause, Niklas
2015-01-01
This study investigated the relationship between different work schedules and progression of carotid atherosclerosis, an early indicator of cardiovascular disease (CVD). We studied 621 men, aged 42-60 years, in the prospective Kuopio Ischemic Heart Disease Risk Factor Study cohort. Using multivariable regressions adjusting for 22 covariates including total time worked during follow-up, we evaluated the associations of baseline work schedules with 11-year progression of ultrasonographically assessed carotid intima-media thickness (IMT), and their variation by preexisting CVD. Standard daytime work, weekend shifts, and evening/night/rotating shifts were associated with 31%, 37%, and 33% increases in IMT, respectively. Compared to daytime workers, weekend workers experienced a faster progression of carotid atherosclerosis [relative change ratio (RCR) = 1.05, 95% CI: 1.00-1.09)]. This ratio was higher among men who had preexisting CVD. Weekend shifts, more than standard daytime work, appear to accelerate carotid atherosclerosis progression among middle-aged Finnish men, especially those with pre-existing CVD. © 2014 Wiley Periodicals, Inc.
Women's autonomy and scheduled cesarean sections in Brazil: a cautionary tale.
Potter, Joseph E; Hopkins, Kristine; Faúndes, Anibal; Perpétuo, Ignez
2008-03-01
In Brazil, one-fourth of all women deliver in the private sector, where the rate of cesarean deliveries is extremely high (70%). Most (64%) private sector cesareans are scheduled, although many women would have preferred a vaginal delivery. The question this study addresses is whether childbearing women were induced to accept the procedure by their physicians, and if so, how? Three face-to-face structured interviews were conducted with 1,612 women (519 private sector and 1,093 public sector) early in pregnancy, approximately 1 month before their due date, and approximately 1 month postpartum. For all private sector patients having a scheduled cesarean section, women's self-reported reasons given for programming surgical delivery were classified into three groups according to obstetrical justification. After loss to follow-up (19.2% of private sector and 34.4% of public sector), our final sample included 1,136 women (419 private sector and 717 public sector). Compared with public sector participants in the final sample, on average, private sector participants were older by 3.4 years (28.7 vs 25.3 yr), had 0.4 fewer previous deliveries (0.6 vs 1.0), and had 3.4 more years of education (11.0 vs 7.6 yr). The final samples also differed slightly with respect to preference for vaginal delivery: 72.3 percent among those in the private sector and 79.6 percent in public sector. The cesarean section rate was 72 percent in the private sector and 31 percent in the public sector. Of the women with reports about the timing of the cesarean decision, 64.4 percent had a scheduled cesarean delivery in the private sector compared with 23.7 percent in the public sector. Many cesarean sections were scheduled for an "unjustified" medical reason, especially among women who, during pregnancy, had declared a preference for a vaginal delivery. Among 96 women in this latter group, the reason reported for the procedure was unjustified in 33 cases. On the other hand, more cesarean deliveries were scheduled for "no medical justification," including physician's or the woman's convenience, among women who preferred to deliver by cesarean (35/65). The incidence of real medical reasons for a scheduled cesarean section diagnosed before the onset of labor among private sector patients who had no previous cesarean birth and who wanted a vaginal delivery was 13 percent (31/243). The data suggest that doctors frequently persuaded their patients to accept a scheduled cesarean section for conditions that either did not exist or did not justify this procedure. The problem identified in this paper may extend well beyond Brazil and should be of concern to those with responsibility for ethical behavior in obstetrics.
1997-04-17
The Spacelab long transfer tunnel that leads from the Space Shuttle Orbiter Columbia’s crew airlock to the Microgravity Science Laboratory-1 (MSL-1) Spacelab module in the spaceplane’s payload bay is removed by KSC paylaod processing employees in Orbiter Processing Facility 1. The tunnel was taken out to allow better access to the MSL-1 module during reservicing operations to prepare it for its reflight as MSL-1R. That mission is now scheduled to lift off July 1. This was the first time that this type of payload was reserviced without removing it from the payload bay. This new procedure pioneers processing efforts for quick relaunch turnaround times for future payloads. The Spacelab module was scheduled to fly again with the full complement of STS-83 experiments after that mission was cut short due to a faulty fuel cell. During the scheduled 16-day reflight, the experiments will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the flight crew conducts combustion, protein crystal growth and materials processing experiments
1997-04-17
The Spacelab long transfer tunnel that leads from the Space Shuttle Orbiter Columbia’s crew airlock to the Microgravity Science Laboratory-1 (MSL-1) Spacelab module in the spaceplane’s payload bay is removed in Orbiter Processing Facility 1. The tunnel was taken out to allow better access to the MSL-1 module during reservicing operations to prepare it for its reflight as MSL-1R. That mission is now scheduled to lift off July 1. This was the first time that this type of payload was reserviced without removing it from the payload bay. This new procedure pioneers processing efforts for quick relaunch turnaround times for future payloads. The Spacelab module was scheduled to fly again with the full complement of STS-83 experiments after that mission was cut short due to a faulty fuel cell. During the scheduled 16-day reflight, the experiments will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the flight crew conducts combustion, protein crystal growth and materials processing experiments
1997-05-01
KSC payload processing employees in Orbiter Processing Facility 1 prepare the Space Shuttle Orbiter Columbia’s crew airlock and payload bay for the reinstallation of the Spacelab long transfer tunnel that leads from the airlock to the Microgravity Science Laboratory-1 (MSL-1) Spacelab module. The tunnel was taken out after the STS-83 mission to allow better access to the MSL-1 module during reservicing operations to prepare it for for the STS-94 mission. That space flight is now scheduled to lift off in early July. This was the first time that this type of payload was reserviced without removing it from the payload bay. This new procedure pioneers processing efforts for quick relaunch turnaround times for future payloads. The Spacelab module was scheduled to fly again with the full complement of STS-83 experiments after that mission was cut short due to a faulty fuel cell. During the scheduled 16-day STS-94 mission, the experiments will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the flight crew conducts combustion, protein crystal growth and materials processing experiments
Reducing elective general surgery cancellations at a Canadian hospital
Azari-Rad, Solmaz; Yontef, Alanna L.; Aleman, Dionne M.; Urbach, David R.
2013-01-01
Background In Canadian hospitals, which are typically financed by global annual budgets, overuse of operating rooms is a financial risk that is frequently managed by cancelling elective surgical procedures. It is uncertain how different scheduling rules affect the rate of elective surgery cancellations. Methods We used discrete event simulation modelling to represent perioperative processes at a hospital in Toronto, Canada. We tested the effects of the following 3 scenarios on the number of surgical cancellations: scheduling surgeons’ operating days based on their patients’ average length of stay in hospital, sequencing surgical procedures by average duration and variance, and increasing the number of post-surgical ward beds. Results The number of elective cancellations was reduced by scheduling surgeons whose patients had shorter average lengths of stay in hospital earlier in the week, sequencing shorter surgeries and those with less variance in duration earlier in the day, and by adding up to 2 additional beds to the postsurgical ward. Conclusion Discrete event simulation modelling can be used to develop strategies for improving efficiency in operating rooms. PMID:23351498
Force Limited Vibration Test of HESSI Imager
NASA Technical Reports Server (NTRS)
Amato, Deborah; Pankow, David; Thomsen, Knud
2000-01-01
The High Energy Solar Spectroscopic Imager (HESSI) is a solar x-ray and gamma-ray observatory scheduled for launch in November 2000. Vibration testing of the HESSI imager flight unit was performed in August 1999. The HESSI imager consists of a composite metering tube, two aluminum trays mounted to the tube on titanium flexure mounts, and nine modulation grids mounted on each tray. The vibration tests were acceleration controlled and force limited, in order to prevent overtesting. The force limited strategy reduced the shaker force and notched the acceleration at resonances. The test set-up, test levels, and results are presented. The development of the force limits is also discussed. The imager successfully survived the vibration testing.
Some Effects of Procedural Variations on Choice Responding in Concurrent Chains
ERIC Educational Resources Information Center
Moore, J.
2009-01-01
The present research used pigeons in a three-key operant chamber and varied procedural features pertaining to both initial and terminal links of concurrent chains. The initial links randomly alternated on the side keys during a session, while the terminal links always appeared on the center key. Both equal and unequal initial-link schedules were…
23 CFR 750.304 - State policies and procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false State policies and procedures. 750.304 Section 750.304... removal program under State law and complying with 23 U.S.C. 131 and its proposed time schedule for sign... severance damages pursuant to 23 CFR 710.304(h), and the law of the State before Federal participation will...
Astronaut Curtis Brown on flight deck mockup during training
NASA Technical Reports Server (NTRS)
1994-01-01
Astronaut Curtis L. Brown, STS-66 pilot, mans the pilot's station during a rehearsal of procedures to be followed during the launch and entry phases of their scheduled November 1994 flight. This rehearsal, held in the crew compartment trainer (CCT) of JSC's Shuttle mockup and integration laboratory, was followed by a training session on emergency egress procedures.
Astronaut Scott Parazynski during egress training
NASA Technical Reports Server (NTRS)
1994-01-01
Astronaut Scott E. Parazynski looks at fellow STS-66 mission specialist Joseph R. Tanner, (foreground) during a rehearsal of procedures to be followed during the launch and entry phases of their scheduled November 1994 flight. This rehearsal, held in the crew compartment trainer (CCT) of JSC's Shuttle mockup and integration laboratory, was followed by a training session on emergency egress procedures.
40 CFR 86.164-00 - Supplemental Federal Test Procedure calculations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... test schedules of FTP, US06, and SC03. (b) The provisions of § 86.144-94(a) are applicable to this section. These provisions provide the procedures for determining the weighted mass emissions for the FTP... emissions per mile for a particular pollutant weighted in terms of the contributions from the FTP, SC03, and...
20 CFR 404.506 - When waiver may be applied and how to process the request.
Code of Federal Regulations, 2010 CFR
2010-04-01
... in writing and given the dates, times and place of the file review and personal conference; the procedure for reviewing the claims file prior to the personal conference; the procedure for seeking a change... individual about the personal conference. The file review is always scheduled at least 5 days before the...
20 CFR 404.506 - When waiver may be applied and how to process the request.
Code of Federal Regulations, 2011 CFR
2011-04-01
... in writing and given the dates, times and place of the file review and personal conference; the procedure for reviewing the claims file prior to the personal conference; the procedure for seeking a change... individual about the personal conference. The file review is always scheduled at least 5 days before the...
Queue position in the endoscopic schedule impacts effectiveness of colonoscopy.
Lee, Alexander; Iskander, John M; Gupta, Nitin; Borg, Brian B; Zuckerman, Gary; Banerjee, Bhaskar; Gyawali, C Prakash
2011-08-01
Endoscopist fatigue potentially impacts colonoscopy. Fatigue is difficult to quantitate, but polyp detection rates between non-fatigued and fatigued time periods could represent a surrogate marker. We assessed whether timing variables impacted polyp detection rates at a busy tertiary care endoscopy suite. Consecutive patients undergoing colonoscopy were retrospectively identified. Indications, clinical demographics, pre-procedural, and procedural variables were extracted from chart review; colonoscopy findings were determined from the procedure reports. Three separate timing variables were assessed as surrogate markers for endoscopist fatigue: morning vs. afternoon procedures, start times throughout the day, and queue position, a unique variable that takes into account the number of procedures performed before the colonoscopy of interest. Univariate and multivariate analyses were performed to determine whether timing variables and other clinical, pre-procedural, and procedural variables predicted polyp detection. During the 4-month study period, 1,083 outpatient colonoscopy procedures (57.5±0.5 years, 59.5% female) were identified, performed by 28 endoscopists (mean 38.7 procedures/endoscopist), with a mean polyp detection rate of 0.851/colonoscopy. At least, one adenoma was detected in 297 procedures (27.4%). A 12.4% reduction in mean detected polyps was detected between morning and afternoon procedures (0.90±0.06 vs. 0.76±0.06, P=0.15). Using start time on a continuous scale, however, each elapsed hour in the day was associated with a 4.6% reduction in polyp detection (P=0.005). When queue position was assessed, a 5.4% reduction in polyp detection was noted with each increase in queue position (P=0.016). These results remained significant when controlled for each individual endoscopist. Polyp detection rates decline as time passes during an endoscopist's schedule, potentially from endoscopist fatigue. Queue position may be a novel surrogate measure for operator fatigue.
A Study on Real-Time Scheduling Methods in Holonic Manufacturing Systems
NASA Astrophysics Data System (ADS)
Iwamura, Koji; Taimizu, Yoshitaka; Sugimura, Nobuhiro
Recently, new architectures of manufacturing systems have been proposed to realize flexible control structures of the manufacturing systems, which can cope with the dynamic changes in the volume and the variety of the products and also the unforeseen disruptions, such as failures of manufacturing resources and interruptions by high priority jobs. They are so called as the autonomous distributed manufacturing system, the biological manufacturing system and the holonic manufacturing system. Rule-based scheduling methods were proposed and applied to the real-time production scheduling problems of the HMS (Holonic Manufacturing System) in the previous report. However, there are still remaining problems from the viewpoint of the optimization of the whole production schedules. New procedures are proposed, in the present paper, to select the production schedules, aimed at generating effective production schedules in real-time. The proposed methods enable the individual holons to select suitable machining operations to be carried out in the next time period. Coordination process among the holons is also proposed to carry out the coordination based on the effectiveness values of the individual holons.
On the distinction between open and closed economies.
Timberlake, W; Peden, B F
1987-01-01
Open and closed economies have been assumed to produce opposite relations between responding and the programmed density of reward (the amount of reward divided by its cost). Experimental procedures that are treated as open economies typically dissociate responding and total reward by providing supplemental income outside the experimental session; procedures construed as closed economies do not. In an open economy responding is assumed to be directly related to reward density, whereas in a closed economy responding is assumed to be inversely related to reward density. In contrast to this predicted correlation between response-reward relations and type of economy, behavior regulation theory predicts both direct and inverse relations in both open and closed economies. Specifically, responding should be a bitonic function of reward density regardless of the type of economy and is dependent only on the ratio of the schedule terms rather than on their absolute size. These predictions were tested by four experiments in which pigeons' key pecking produced food on fixed-ratio and variable-interval schedules over a range of reward magnitudes and under several open- and closed-economy procedures. The results better supported the behavior regulation view by showing a general bitonic function between key pecking and food density in all conditions. In most cases, the absolute size of the schedule requirement and the magnitude of reward had no effect; equal ratios of these terms produced approximately equal responding. PMID:3625103
Travelers with Disabilities and Medical Conditions
... Rule Special Procedures Disabilities & Medical Military Children Seniors Law Enforcement Cultural TSA Pre✓® Airports & Airlines Schedule FAQ Passenger Support Civil Rights Travel Redress Claims Travel Tips Travel Checklist ...
[Small-cell lung cancer: epidemiology, diagnostics and therapy].
Pešek, Miloš; Mužík, Jan
Authors present actual overview of information on diagnostic and therapeutic procedures in small-cell lung cancer (SCLC). This highly aggressive type of lung cancer is diagnosed in 14.8 % of Czech lung cancer patients. Vast majority of those patients (87 %) suffer from advanced and metastatic disease in the time of diagnosis. In this issue are presented prognostic factors, staging diagnostic procedures and therapeutic recommendations. The backbone of actual SCLC treatment is combined chemotherapy and radiotherapy and less frequently, carefully in selected cases, surgical procedures. SCLC should be have as chemosensitive, chemoresistent or chemorefractory disease. Actual cytostatic combinations used in 1st line treatment, different schedules of chemoradiotherapy, drugs used in second line treatment and schedules and timing of prophylactic brain irradiation are presented. In near future, perspectively, there are some promissible data on antitumour immunotherapy based on anti CTLA-4 and anti PD-1/PE-L1 antibodies also in SCLC patients.Key words: cancer immunotherapy - concomitant chemoradiotherapy - chemotherapy - chest radiotherapy - lung resections - prophylactic brain irradiation - small cell lung cancer.
NASA Technical Reports Server (NTRS)
2011-01-01
NASA is interested in developing technology that leads to more routine, safe, and affordable access to space. Access to space using airbreathing propulsion systems has potential to meet these objectives based on Airbreathing Access to Space (AAS) system studies. To this end, the NASA Fundamental Aeronautics Program (FAP) Hypersonic Project is conducting fundamental research on a Turbine Based Combined Cycle (TBCC) propulsion system. The TBCC being studied considers a dual flow-path inlet system. One flow-path includes variable geometry to regulate airflow to a turbine engine cycle. The turbine cycle provides propulsion from take-off to supersonic flight. The second flow-path supports a dual-mode scramjet (DMSJ) cycle which would be initiated at supersonic speed to further accelerate the vehicle to hypersonic speed. For a TBCC propulsion system to accelerate a vehicle from supersonic to hypersonic speed, a critical enabling technology is the ability to safely and effectively transition from the turbine to the DMSJ-referred to as mode transition. To experimentally test methods of mode transition, a Combined Cycle Engine (CCE) Large-scale Inlet testbed was designed with two flow paths-a low speed flow-path sized for a turbine cycle and a high speed flow-path designed for a DMSJ. This testbed system is identified as the CCE Large-Scale Inlet for Mode Transition studies (CCE-LIMX). The test plan for the CCE-LIMX in the NASA Glenn Research Center (GRC) 10- by 10-ft Supersonic Wind Tunnel (10x10 SWT) is segmented into multiple phases. The first phase is a matrix of inlet characterization (IC) tests to evaluate the inlet performance and establish the mode transition schedule. The second phase is a matrix of dynamic system identification (SysID) experiments designed to support closed-loop control development at mode transition schedule operating points for the CCE-LIMX. The third phase includes a direct demonstration of controlled mode transition using a closed loop control system developed with the data obtained from the first two phases. Plans for a fourth phase include mode transition experiments with a turbine engine. This paper, focusing on the first two phases of experiments, presents developed operational and analysis tools for streamlined testing and data reduction procedures.
Ulloa, Jesus G; Russell, Marika D; Chen, Alice Hm; Tuot, Delphine S
2017-06-23
Electronic consultation (eConsult) systems have enhanced access to specialty expertise and enhanced care coordination among primary care and specialty care providers, while maintaining high primary care provider (PCP), specialist and patient satisfaction. Little is known about their impact on the efficiency of specialty care delivery, in particular surgical yield (percent of ambulatory visits resulting in a scheduled surgical case). Retrospective cohort of a random selection of 150 electronic consults from PCPs to a safety-net general surgery clinic for the three most common general surgery procedures (herniorrhaphy, cholecystectomy, anorectal procedures) in 2014. Electronic consultation requests were reviewed for the presence/absence of consult domains: symptom acuity/severity, diagnostic evaluation, concurrent medical conditions, and attempted diagnosis. Logic regression was used to examine the association between completeness of consult requests and scheduling an ambulatory clinic visit. Surgical yield was also calculated, as was the percentage of patients requiring unanticipated healthcare visits. In 2014, 1743 electronic consultations were submitted to general surgery. Among the 150 abstracted, the presence of consult domains ranged from 49% to 99%. Consult completeness was not associated with greater likelihood of scheduling an ambulatory visit. Seventy-six percent of consult requests (114/150) were scheduled for a clinic appointment and surgical yield was 46%; without an eConsult system, surgical yield would have been 35% (p=0.07). Among patients not scheduled for a clinic visit (n=36), 4 had related unanticipated emergency department visits. Econsult systems can be used to safely optimize the surgical yield of a safety-net general surgery service.
40 CFR 305.27 - Accelerated order, order to dismiss.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Accelerated order, order to dismiss. 305.27 Section 305.27 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND..., AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...
40 CFR 305.27 - Accelerated order, order to dismiss.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Accelerated order, order to dismiss. 305.27 Section 305.27 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND..., AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...
40 CFR 305.27 - Accelerated order, order to dismiss.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Accelerated order, order to dismiss. 305.27 Section 305.27 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND..., AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...
DOT National Transportation Integrated Search
1986-09-01
A standard accelerated weathering test using Dimethyl Sulfoxide (DMSO) was developed to simulate the chemical degradation of basaltic rocks. After a thorough study of the parameters affecting the current procedure, such as container geometry, aggrega...
40 CFR 1065.630 - Local acceleration of gravity.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Local acceleration of gravity. 1065.630 Section 1065.630 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Calculations and Data Requirements § 1065.630 Local...
Dexter, Franklin; Dexter, Elisabeth U; Masursky, Danielle; Nussmeier, Nancy A
2008-04-01
Previous studies of operating room (OR) information systems data over the past two decades have shown how to predict case durations using the combination of scheduled procedure(s), individual surgeon and assistant(s), and type of anesthetic(s). We hypothesized that the accuracy of case duration prediction could be improved by the use of other electronic medical record data (e.g., patient weight or surgeon notes using standardized vocabularies). General thoracic surgery was used as a model specialty because much of its workload is elective (scheduled) and many of its cases are long. PubMed was searched for thoracic surgery papers reporting operative time, surgical time, etc. The systematic literature review identified 48 papers reporting statistically significant differences in perioperative times. There were multiple reports of differences in OR times based on the procedure(s), perioperative team including primary surgeon, and type of anesthetic, in that sequence of importance. All such detail may not be known when the case is originally scheduled and thus may require an updated duration the day before surgery. Although the use of these categorical data from OR systems can result in few historical data for estimating each case's duration, bias and imprecision of case duration estimates are unlikely to be affected. There was a report of a difference in case duration based on additional information. However, the incidence of the procedure for the diagnosis was so uncommon as to be unlikely to affect OR management. Matching findings of prior studies using OR information system data, multiple case series show that it is important to rely on the precise procedure(s), surgical team, and type of anesthetic when estimating case durations. OR information systems need to incorporate the statistical methods designed for small numbers of prior surgical cases. Future research should focus on the most effective methods to update the prediction of each case's duration as these data become available. The case series did not reveal additional data which could be cost-effectively integrated with OR information systems data to improve the accuracy of predicted durations for general thoracic surgery cases.
Decomposition of timed automata for solving scheduling problems
NASA Astrophysics Data System (ADS)
Nishi, Tatsushi; Wakatake, Masato
2014-03-01
A decomposition algorithm for scheduling problems based on timed automata (TA) model is proposed. The problem is represented as an optimal state transition problem for TA. The model comprises of the parallel composition of submodels such as jobs and resources. The procedure of the proposed methodology can be divided into two steps. The first step is to decompose the TA model into several submodels by using decomposable condition. The second step is to combine individual solution of subproblems for the decomposed submodels by the penalty function method. A feasible solution for the entire model is derived through the iterated computation of solving the subproblem for each submodel. The proposed methodology is applied to solve flowshop and jobshop scheduling problems. Computational experiments demonstrate the effectiveness of the proposed algorithm compared with a conventional TA scheduling algorithm without decomposition.
Optimization Models for Scheduling of Jobs
Indika, S. H. Sathish; Shier, Douglas R.
2006-01-01
This work is motivated by a particular scheduling problem that is faced by logistics centers that perform aircraft maintenance and modification. Here we concentrate on a single facility (hangar) which is equipped with several work stations (bays). Specifically, a number of jobs have already been scheduled for processing at the facility; the starting times, durations, and work station assignments for these jobs are assumed to be known. We are interested in how best to schedule a number of new jobs that the facility will be processing in the near future. We first develop a mixed integer quadratic programming model (MIQP) for this problem. Since the exact solution of this MIQP formulation is time consuming, we develop a heuristic procedure, based on existing bin packing techniques. This heuristic is further enhanced by application of certain local optimality conditions. PMID:27274921
NASA Technical Reports Server (NTRS)
1994-01-01
This handbook sets forth the minimum retention periods of official records of NASA. Its provisions are applicable to NASA Headquarters and all field installations. This revised edition has been correlated to the 'NASA Uniform Files Index (UFI) (NHB 1442.1B), the General Records Schedules' produced by the National Archives and Records Administration (NARA), and has been enlarged in scope to cover Privacy Act Systems of Records and record series previously omitted. Guidance is provided in the areas of record retirement, transfer, and retrieval from Federal Record Centers (FRC) and disposal actions. Included are provisions for making changes to these schedules by addition of new items or revision of current items. The NASA Records Retention Schedules (NRRS) were approved for NASA use by NARA, the General Services Administration, and the General Accounting Office.
2011-09-01
with an accelerated schedule Convection-Enhanced Delivery ( CED ), Malignant Peripheral Nerve Sheath ( MPNST ), Plexiform Neurofibromas (PN...the distribution of macromolecules delivered to intraneural PNs and MPNST via CED . Design: Orthotopic xenograft models of sciatic intraneural NF1...determine the efficacy CED of the epidermal growth factor receptor (EGFR) inhibitor erlotinib in animal models of intraneural PNs and MPNST
Solar thermal power storage applications lead laboratory overview
NASA Technical Reports Server (NTRS)
Radosevich, L. G.
1980-01-01
The implementation of the applications elements of the thermal energy storage for Solar Thermal Applications program is described. The program includes the accelerated development of thermal storage technologies matched to solar thermal power system requirements and scheduled milestones. The program concentrates on storage development in the FY80 to 85 time period with emphasis on the more near-term solar thermal power system application.
2002-01-10
VANDENBERG AFB, CALIF. -- Technicians ready the Pegasus XL rocket, the vehicle that will launch the High Energy Solar Spectroscopic Imager (HESSI), for flight to Florida. The primary mission of HESSI is to explore the basic physics of particle acceleration and energy release in solar flares. The launch of PegasusXL/HESSI is scheduled for Feb. 5, 2002, from beneath an Orbital Sciences Corp. L-1011 aircraft over the Atlantic Ocean
Allal, Abdelkarim S; Taussky, Daniel; Mach, Nicolas; Becker, Minerva; Bieri, Sabine; Dulguerov, Pavel
2004-04-01
Accelerated schedules are effective in overcoming repopulation during radiotherapy (RT) for head-and-neck cancers, but their feasibility is compromised by increased toxicity. The therapeutic ratio may be particularly favorable for 5-week regimens. This study reports the 10-year experience of a single institution in the routine use of concomitant boost RT as standard radical treatment in all but the most favorable stage patients. Between February 1991 and June 2001, 296 patients (mean age, 59 years) were treated with concomitant boost RT either alone (67%) or combined with cisplatin-based chemotherapy (33%), with a median tumor dose of 69.9 Gy. Tumors were located in the oropharynx in 52%, hypopharynx in 20%, larynx in 15%, nasopharynx in 7%, and oral cavity in 6%. International Union Against Cancer Stage III-IV disease represented 77% of tumors. The median follow-up for surviving patients was 55 months (range, 10-138 months). The RT schedule was completed to the prescribed dose in all but 1 patient. Twenty patients (7%) had a treatment interruption (median, 5 days; range, 2-35 days). Grade 3-4 Radiation Therapy Oncology Group acute toxicity was observed in 77% of patients, and nutritional support was required in 110 patients (37%). For all patients, the 5-year actuarial locoregional control and disease-free survival rate was 72% and 61%, respectively. In a multivariate analysis, only T and N stage was significantly associated with locoregional control and disease-free survival. Grade 3-4 late toxicity occurred in 14%, mostly bone and cartilage necrosis. The present, moderately accelerated, concomitant boost regimen is logistically feasible, causing minimal inconvenience to the technical staff and yielding a high rate of patient compliance. Concomitant chemotherapy administration is feasible provided that patients are carefully selected and supportive care is introduced in a timely fashion. Considering the manageable toxicity and the satisfactory tumor control obtained, this regimen represents a good choice when considering implementation of an altered RT fractionation schedule as standard treatment for head-and-neck cancers.
Seismic design parameters - A user guide
Leyendecker, E.V.; Frankel, A.D.; Rukstales, K.S.
2001-01-01
The 1997 NEHRP Recommended Provisions for Seismic Regulations for New Buildings (1997 NEHRP Provisions) introduced seismic design procedure that is based on the explicit use of spectral response acceleration rather than the traditional peak ground acceleration and/or peak ground velocity or zone factors. The spectral response accelerations are obtained from spectral response acceleration maps accompanying the report. Maps are available for the United States and a number of U.S. territories. Since 1997 additional codes and standards have also adopted seismic design approaches based on the same procedure used in the NEHRP Provisions and the accompanying maps. The design documents using the 1997 NEHRP Provisions procedure may be divided into three categories -(1) Design of New Construction, (2) Design and Evaluation of Existing Construction, and (3) Design of Residential Construction. A CD-ROM has been prepared for use in conjunction with the design documents in each of these three categories. The spectral accelerations obtained using the software on the CD are the same as those that would be obtained by using the maps accompanying the design documents. The software has been prepared to operate on a personal computer using a Windows (Microsoft Corporation) operating environment and a point and click type of interface. The user can obtain the spectral acceleration values that would be obtained by use of the maps accompanying the design documents, include site factors appropriate for the Site Class provided by the user, calculate a response spectrum that includes the site factor, and plot a response spectrum. Sites may be located by providing the latitude-longitude or zip code for all areas covered by the maps. All of the maps used in the various documents are also included on the CDROM
19 CFR 111.13 - Written examination for individual license.
Code of Federal Regulations, 2010 CFR
2010-04-01
... and procedures, bookkeeping, accounting, and all other appropriate matters necessary to render... first Monday in April and October unless the regularly scheduled examination date conflicts with a...
Run-time parallelization and scheduling of loops
NASA Technical Reports Server (NTRS)
Saltz, Joel H.; Mirchandaney, Ravi; Crowley, Kay
1991-01-01
Run-time methods are studied to automatically parallelize and schedule iterations of a do loop in certain cases where compile-time information is inadequate. The methods presented involve execution time preprocessing of the loop. At compile-time, these methods set up the framework for performing a loop dependency analysis. At run-time, wavefronts of concurrently executable loop iterations are identified. Using this wavefront information, loop iterations are reordered for increased parallelism. Symbolic transformation rules are used to produce: inspector procedures that perform execution time preprocessing, and executors or transformed versions of source code loop structures. These transformed loop structures carry out the calculations planned in the inspector procedures. Performance results are presented from experiments conducted on the Encore Multimax. These results illustrate that run-time reordering of loop indexes can have a significant impact on performance.
Lehmann, Deborah; Kirarock, Wendy; van den Biggelaar, Anita H J; Passey, Megan; Jacoby, Peter; Saleu, Gerard; Masiria, Geraldine; Nivio, Birunu; Greenhill, Andrew; Orami, Tilda; Francis, Jacinta; Ford, Rebecca; Kirkham, Lea-Ann; Solomon, Vela; Richmond, Peter C; Pomat, William S
2017-01-01
Children in third-world settings including Papua New Guinea (PNG) experience early onset of carriage with a broad range of pneumococcal serotypes, resulting in a high incidence of severe pneumococcal disease and deaths in the first 2 years of life. Vaccination trials in high endemicity settings are needed to provide evidence and guidance on optimal strategies to protect children in these settings against pneumococcal infections. This report describes the rationale, objectives, methods, study population, follow-up and specimen collection for a vaccination trial conducted in an endemic and logistically challenging setting in PNG. The trial aimed to determine whether currently available pneumococcal conjugate vaccines (PCV) are suitable for use under PNG's accelerated immunization schedule, and that a schedule including pneumococcal polysaccharide vaccine (PPV) in later infancy is safe and immunogenic in this high-risk population. This open randomized-controlled trial was conducted between November 2011 and March 2016, enrolling 262 children aged 1 month between November 2011 and April 2014. The participants were randomly allocated (1:1) to receive 10-valent PCV (10vPCV) or 13-valent PCV (13vPCV) in a 1-2-3-month schedule, with further randomization to receive PPV or no PPV at age 9 months, followed by a 1/5 th PPV challenge at age 23 months. A total of 1229 blood samples were collected to measure humoral and cellular immune responses and 1238 nasopharyngeal swabs to assess upper respiratory tract colonization and carriage load. Serious adverse events were monitored throughout the study. Of the 262 children enrolled, 87% received 3 doses of PCV, 79% were randomized to receive PPV or no PPV at age 9 months, and 67% completed the study at 24 months of age with appropriate immunization and challenge. Laboratory testing of the many samples collected during this trial will determine the impact of the different vaccine schedules and formulations on nasopharyngeal carriage, antibody production and function, and immune memory. The final data will inform policy on pneumococcal vaccine schedules in countries with children at high risk of pneumococcal disease by providing direct comparison of an accelerated schedule of 10vPCV and 13vPCV and the potential advantages of PPV following PCV immunization. ClinicalTrials.gov CTN NCT01619462, retrospectively registered on May 28, 2012.
NASA Technical Reports Server (NTRS)
Prevot, Thomas; Mercer, Joey S.; Martin, Lynne Hazel; Homola, Jeffrey R.; Cabrall, Christopher D.; Brasil, Connie L.
2011-01-01
In this paper we discuss the development and evaluation of our prototype technologies and procedures for far-term air traffic control operations with automation for separation assurance, weather avoidance and schedule conformance. Controller-in-the-loop simulations in the Airspace Operations Laboratory at the NASA Ames Research Center in 2010 have shown very promising results. We found the operations to provide high airspace throughput, excellent efficiency and schedule conformance. The simulation also highlighted areas for improvements: Short-term conflict situations sometimes resulted in separation violations, particularly for transitioning aircraft in complex traffic flows. The combination of heavy metering and growing weather resulted in an increased number of aircraft penetrating convective weather cells. To address these shortcomings technologies and procedures have been improved and the operations are being re-evaluated with the same scenarios. In this paper we will first describe the concept and technologies for automating separation assurance, weather avoidance, and schedule conformance. Second, the results from the 2010 simulation will be reviewed. We report human-systems integration aspects, safety and efficiency results as well as airspace throughput, workload, and operational acceptability. Next, improvements will be discussed that were made to address identified shortcomings. We conclude that, with further refinements, air traffic control operations with ground-based automated separation assurance can routinely provide currently unachievable levels of traffic throughput in the en route airspace.
40 CFR 131.7 - Dispute resolution mechanism.
Code of Federal Regulations, 2010 CFR
2010-07-01
... parties, to study the problem and recommend an appropriate solution. (iv) The procedure and schedule for... dischargers, comparative risks to public health and the environment, economic impacts, present and historical...
40 CFR 131.7 - Dispute resolution mechanism.
Code of Federal Regulations, 2011 CFR
2011-07-01
... parties, to study the problem and recommend an appropriate solution. (iv) The procedure and schedule for... dischargers, comparative risks to public health and the environment, economic impacts, present and historical...
40 CFR 131.7 - Dispute resolution mechanism.
Code of Federal Regulations, 2014 CFR
2014-07-01
... parties, to study the problem and recommend an appropriate solution. (iv) The procedure and schedule for... dischargers, comparative risks to public health and the environment, economic impacts, present and historical...
40 CFR 131.7 - Dispute resolution mechanism.
Code of Federal Regulations, 2013 CFR
2013-07-01
... parties, to study the problem and recommend an appropriate solution. (iv) The procedure and schedule for... dischargers, comparative risks to public health and the environment, economic impacts, present and historical...
40 CFR 131.7 - Dispute resolution mechanism.
Code of Federal Regulations, 2012 CFR
2012-07-01
... parties, to study the problem and recommend an appropriate solution. (iv) The procedure and schedule for... dischargers, comparative risks to public health and the environment, economic impacts, present and historical...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Castellana, Vito G.; Tumeo, Antonino; Ferrandi, Fabrizio
Emerging applications such as data mining, bioinformatics, knowledge discovery, social network analysis are irregular. They use data structures based on pointers or linked lists, such as graphs, unbalanced trees or unstructures grids, which generates unpredictable memory accesses. These data structures usually are large, but difficult to partition. These applications mostly are memory bandwidth bounded and have high synchronization intensity. However, they also have large amounts of inherent dynamic parallelism, because they potentially perform a task for each one of the element they are exploring. Several efforts are looking at accelerating these applications on hybrid architectures, which integrate general purpose processorsmore » with reconfigurable devices. Some solutions, which demonstrated significant speedups, include custom-hand tuned accelerators or even full processor architectures on the reconfigurable logic. In this paper we present an approach for the automatic synthesis of accelerators from C, targeted at irregular applications. In contrast to typical High Level Synthesis paradigms, which construct a centralized Finite State Machine, our approach generates dynamically scheduled hardware components. While parallelism exploitation in typical HLS-generated accelerators is usually bound within a single execution flow, our solution allows concurrently running multiple execution flow, thus also exploiting the coarser grain task parallelism of irregular applications. Our approach supports multiple, multi-ported and distributed memories, and atomic memory operations. Its main objective is parallelizing as many memory operations as possible, independently from their execution time, to maximize the memory bandwidth utilization. This significantly differs from current HLS flows, which usually consider a single memory port and require precise scheduling of memory operations. A key innovation of our approach is the generation of a memory interface controller, which dynamically maps concurrent memory accesses to multiple ports. We present a case study on a typical irregular kernel, Graph Breadth First search (BFS), exploring different tradeoffs in terms of parallelism and number of memories.« less
A Solution Method of Scheduling Problem with Worker Allocation by a Genetic Algorithm
NASA Astrophysics Data System (ADS)
Osawa, Akira; Ida, Kenichi
In a scheduling problem with worker allocation (SPWA) proposed by Iima et al, the worker's skill level to each machine is all the same. However, each worker has a different skill level for each machine in the real world. For that reason, we propose a new model of SPWA in which a worker has the different skill level to each machine. To solve the problem, we propose a new GA for SPWA consisting of the following new three procedures, shortening of idle time, modifying infeasible solution to feasible solution, and a new selection method for GA. The effectiveness of the proposed algorithm is clarified by numerical experiments using benchmark problems for job-shop scheduling.
DORCA computer program. Volume 1: User's guide
NASA Technical Reports Server (NTRS)
Wray, S. T., Jr.
1971-01-01
The Dynamic Operational Requirements and Cost Analysis Program (DORCA) was written to provide a top level analysis tool for NASA. DORCA relies on a man-machine interaction to optimize results based on external criteria. DORCA relies heavily on outside sources to provide cost information and vehicle performance parameters as the program does not determine these quantities but rather uses them. Given data describing missions, vehicles, payloads, containers, space facilities, schedules, cost values and costing procedures, the program computes flight schedules, cargo manifests, vehicle fleet requirements, acquisition schedules and cost summaries. The program is designed to consider the Earth Orbit, Lunar, Interplanetary and Automated Satellite Programs. A general outline of the capabilities of the program are provided.
AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT VII, ENGINE TUNE-UP--DETROIT DIESEL ENGINE.
ERIC Educational Resources Information Center
Human Engineering Inst., Cleveland, OH.
THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF TUNE-UP PROCEDURES FOR DIESEL ENGINES. TOPICS ARE SCHEDULING TUNE-UPS, AND TUNE-UP PROCEDURES. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM "ENGINE TUNE-UP--DETROIT DIESEL ENGINE" AND OTHER MATERIALS. SEE VT 005 655 FOR FURTHER INFORMATION.…
Choice in a Successive-Encounters Procedure and Hyperbolic Decay of Reinforcement
ERIC Educational Resources Information Center
Mazur, James E.
2007-01-01
Pigeons responded in a successive-encounters procedure that consisted of a search state, a choice state, and a handling state. The search state was either a fixed-interval or mixed-interval schedule presented on the center key of a three-key chamber. Upon completion of the search state, the choice state was presented, in which the center key was…
Astronaut Scott Parazynski during egress training
NASA Technical Reports Server (NTRS)
1994-01-01
Astronaut Scott E. Parazynski looks at fellow STS-66 mission specialist Joseph R. Tanner, (partially visible in foreground) during a rehearsal of procedures to be followed during the launch and entry phases of their scheduled November 1994 flight. This rehearsal, held in the crew compartment trainer (CCT) of JSC's Shuttle mockup and integration laboratory, was followed by a training session on emergency egress procedures.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-04
...This document announces the procedures, reserve price, and minimum opening bids for the upcoming auction of H Block licenses (Auction 96) and provides the revised schedule for Auction 96. This document is intended to familiarize prospective applicants with the procedures and other requirements for participation in the auction.
Comparison of Everyday and Every-Fourth-Day Probe Sessions with the Simultaneous Prompting Procedure
ERIC Educational Resources Information Center
Reichow, Brian; Wolery, Mark
2009-01-01
Simultaneous prompting is a response-prompting procedure requiring two daily sessions: an instructional session in which a controlling prompt is provided on all trials, and a probe session in which no prompt is provided on any trials. In this study, two schedules of conducting the probe sessions (daily vs. every fourth day) were compared using the…
The USL NASA PC R and D development environment standards
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Moreau, Dennis R.
1984-01-01
The development environment standards which have been established in order to control usage of the IBM PC/XT development systems and to prevent interference between projects being currently developed on the PC's are discussed. The standards address the following areas: scheduling PC resources; login/logout procedures; training; file naming conventions; hard disk organization; diskette care; backup procedures; and copying policies.
Practices & Procedures of Mason Tending I & II. Instructor Manual. Trainee Manual.
ERIC Educational Resources Information Center
Laborers-AGC Education and Training Fund, Pomfret Center, CT.
This packet consists of the instructor and trainee manuals for two courses: practices and procedures of mason tending I and II. The instructor manual for mason tending I contains a schedule for a 40-hour, 5-day course and instructor outline. The outline provides a step-by-step description of the instructor's activities and includes answer sheets…
The Use of a Discrimination-Training Procedure to Teach Mand Variability to Children with Autism
ERIC Educational Resources Information Center
Brodhead, Matthew T.; Higbee, Thomas S.; Gerencser, Kristina R.; Akers, Jessica S.
2016-01-01
We investigated the effects of a script-fading and discrimination-training procedure on mand variability in preschoolers with autism. Participants were taught to vary their vocal mands in the presence of written scripts, a green placemat, and a lag schedule of reinforcement. They were also taught to engage in repetitive mands in the presence of…
A theory of behaviour on progressive ratio schedules, with applications in behavioural pharmacology.
Bradshaw, C M; Killeen, P R
2012-08-01
Mathematical principles of reinforcement (MPR) provide the theoretical basis for a family of models of schedule-controlled behaviour. A model of fixed-ratio schedule performance that was applied to behaviour on progressive ratio (PR) schedules showed systematic departures from the data. This study aims to derive a new model from MPR that will account for overall and running response rates in the component ratios of PR schedules, and their decline toward 0, the breakpoint. The role of pausing is represented in a real-time model containing four parameters: T (0) and k are the intercept and slope of the linear relation between post-reinforcement pause duration and the prior inter-reinforcer interval; a (specific activation) measures the incentive value of the reinforcer; δ (response time) sets biomechanical limits on response rate. Running rate is predicted to decrease with negative acceleration as ratio size increments, overall rate to increase and then decrease. Differences due to type of progression are explained as hysteresis in the control by reinforcement rates. Re-analysis of extant data focuses on the effects of acute treatment with antipsychotic drugs, lesions of the nucleus accumbens core, and destruction of orexinergic neurones of the lateral hypothalamus. The new model resolves some anomalies evident in earlier analyses, and provides new insights to the results of these interventions. Because they can render biologically relevant parameters, mathematical models can provide greater power in interpreting the effects of interventions on the processes underlying schedule-controlled behaviour than is possible for first-order data such as the breakpoint.
21 CFR 606.65 - Supplies and reagents.
Code of Federal Regulations, 2014 CFR
2014-04-01
... solutions shall be tested on a regularly scheduled basis by methods described in the Standard Operating Procedures Manual to determine their capacity to perform as required: Reagent or solution Frequency of...
21 CFR 606.65 - Supplies and reagents.
Code of Federal Regulations, 2012 CFR
2012-04-01
... solutions shall be tested on a regularly scheduled basis by methods described in the Standard Operating Procedures Manual to determine their capacity to perform as required: Reagent or solution Frequency of...
21 CFR 606.65 - Supplies and reagents.
Code of Federal Regulations, 2013 CFR
2013-04-01
... solutions shall be tested on a regularly scheduled basis by methods described in the Standard Operating Procedures Manual to determine their capacity to perform as required: Reagent or solution Frequency of...
21 CFR 606.65 - Supplies and reagents.
Code of Federal Regulations, 2011 CFR
2011-04-01
... solutions shall be tested on a regularly scheduled basis by methods described in the Standard Operating Procedures Manual to determine their capacity to perform as required: Reagent or solution Frequency of...
Development of an accelerated creep testing procedure for geosynthetics.
DOT National Transportation Integrated Search
1997-09-01
The report presents a procedure for predicting creep strains of geosynthetics using creep tests at elevated temperatures. Creep testing equipment was constructed and tests were performed on two types of geosynthetics: High Density Polyethylene (HDPE)...
Development of an accelerated creep testing procedure for geosynthetics : technical summary.
DOT National Transportation Integrated Search
1997-09-01
Temperature-creep relationships in geosynthetics vary for each type of geogrid and depend on many factors such as polymer structure, manufacture process, degree of crystallinity, and glass-transition temperature. The extrapolation procedures to predi...