An expert system for scheduling requests for communications Links between TDRSS and ERBS
NASA Technical Reports Server (NTRS)
Mclean, David R.; Littlefield, Ronald G.; Beyer, David S.
1987-01-01
An ERBS-TDRSS Contact Planning System (ERBS-TDRSS CPS) is described which uses a graphics interface and the NASA Transportable Interference Engine. The procedure involves transfer of the ERBS-TDRSS Ground Track Orbit Prediction data to the ERBS flight operations area, where the ERBS-TDRSS CPS automatically generates requests for TDRSS service. As requested events are rejected, alternative context sensitive strategies are employed to generate new requested events until a schedule is completed. A report generator builds schedule requests for separate ERBS-TDRSS contacts.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
... boundary determinations, coastal engineering, storm warnings and hazard mitigation, emergency management... shoreline depiction may need to be updated on the next regularly scheduled chart edition. Although... Web site ( http://www.tidesandcurrents.noaa.gov ) or contact the Center for Operational Oceanographic...
A COTS-Based Attitude Dependent Contact Scheduling System
NASA Technical Reports Server (NTRS)
DeGumbia, Jonathan D.; Stezelberger, Shane T.; Woodard, Mark
2006-01-01
The mission architecture of the Gamma-ray Large Area Space Telescope (GLAST) requires a sophisticated ground system component for scheduling the downlink of science data. Contacts between the ````````````````` satellite and the Tracking and Data Relay Satellite System (TDRSS) are restricted by the limited field-of-view of the science data downlink antenna. In addition, contacts must be scheduled when permitted by the satellite s complex and non-repeating attitude profile. Complicating the matter further, the long lead-time required to schedule TDRSS services, combined with the short duration of the downlink contact opportunities, mandates accurate GLAST orbit and attitude modeling. These circumstances require the development of a scheduling system that is capable of predictively and accurately modeling not only the orbital position of GLAST but also its attitude. This paper details the methods used in the design of a Commercial Off The Shelf (COTS)-based attitude-dependent. TDRSS contact Scheduling system that meets the unique scheduling requirements of the GLAST mission, and it suggests a COTS-based scheduling approach to support future missions. The scheduling system applies filtering and smoothing algorithms to telemetered GPS data to produce high-accuracy predictive GLAST orbit ephemerides. Next, bus pointing commands from the GLAST Science Support Center are used to model the complexities of the two dynamic science gathering attitude modes. Attitude-dependent view periods are then generated between GLAST and each of the supporting TDRSs. Numerous scheduling constraints are then applied to account for various mission specific resource limitations. Next, an optimization engine is used to produce an optimized TDRSS contact schedule request which is sent to TDRSS scheduling for confirmation. Lastly, the confirmed TDRSS contact schedule is rectified with an updated ephemeris and adjusted bus pointing commands to produce a final science downlink contact schedule.
77 FR 32668 - Pure Magnesium (Granular) From China; Scheduling of an Expedited Five-Year Review
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-01
... Commission's Rules of Practice and Procedure, part 201, subparts A through E (19 CFR part 201), and part 207, subparts A, D, E, and F (19 CFR part 207). DATES: Effective Date: May 7, 2012. FOR FURTHER INFORMATION CONTACT: Mary Messer (202-205-3193), Office of Investigations, U.S. International Trade Commission, 500 E...
The costs of reducing loss to follow-up in South African cervical cancer screening
Goldhaber-Fiebert, Jeremy D; Denny, Lynette E; De Souza, Michelle; Wright, Thomas C; Kuhn, Louise; Goldie, Sue J
2005-01-01
Background This study was designed to quantify the resources used in reestablishing contact with women who missed their scheduled cervical cancer screening visits and to assess the success of this effort in reducing loss to follow-up in a developing country setting. Methods Women were enrolled in this Cape Town, South Africa-based screening study between 2000 and 2003, and all had scheduled follow-up visits in 2003. Community health worker (CHW) time, vehicle use, maintenance, and depreciation were estimated from weekly logs and cost accounting systems. The percentage of women who attended their scheduled visit, those who attended after CHW contact(s), and those who never returned despite attempted contact(s) were determined. The number of CHW visits per woman was also estimated. Results 3,711 visits were scheduled in 2003. Of these, 2,321 (62.5%) occurred without CHW contact, 918 (24.8%) occurred after contact(s), and 472 (12.7%) did not occur despite contact(s). Loss to follow-up was reduced from 21% to 6%, 39% to 10%, and 50% to 24% for 6, 12, and 24-month visits. CHWs attempted 3,200 contacts in 530 trips. On average, 3 CHWs attempted to contact 6 participants over each 111 minute trip. The per-person cost (2003 Rand) for these activities was 12.75, 24.92, and 40.50 for 6, 12, and 24-month visits. Conclusion CHW contact with women who missed scheduled visits increased their return rate. Cost-effectiveness analyses aimed at policy decisions about cervical cancer screening in developing countries should incorporate these findings. PMID:16288646
Satellite antenna management system and method
NASA Technical Reports Server (NTRS)
Leath, Timothy T (Inventor); Azzolini, John D (Inventor)
1999-01-01
The antenna management system and method allow a satellite to communicate with a ground station either directly or by an intermediary of a second satellite, thus permitting communication even when the satellite is not within range of the ground station. The system and method employ five major software components, which are the control and initialization module, the command and telemetry handler module, the contact schedule processor module, the contact state machining module, and the telemetry state machine module. The control and initialization module initializes the system and operates the main control cycle, in which the other modules are called. The command and telemetry handler module handles communication to and from the ground station. The contact scheduler processor module handles the contact entry schedules to allow scheduling of contacts with the second satellite. The contact and telemetry state machine modules handle the various states of the satellite in beginning, maintaining and ending contact with the second satellite and in beginning, maintaining and ending communication with the satellite.
Using Percentile Schedules to Increase Eye Contact in Children with Fragile X Syndrome
ERIC Educational Resources Information Center
Hall, Scott S.; Maynes, Natalee P.; Reiss, Allan L.
2009-01-01
Aversion to eye contact is a common behavior of individuals diagnosed with Fragile X syndrome (FXS); however, no studies to date have attempted to increase eye-contact duration in these individuals. In this study, we employed a percentile reinforcement schedule with and without overcorrection to shape eye-contact duration of 6 boys with FXS.…
2001-12-01
Government Version: 07/02/96 Date of Last EDR Contact* 09/16/96 Database Release Frequency: N/A Date of Next Scheduled EDR Contact: 12/16,/96 SONOMA COUNTY : LUST...Sites Source: Sonoma County Public Health Department Telephone: 707-525-6565 Date of Government Version: 05/10/96 Date of Last EDR Contact: 09...N/A Date of Next Scheduled EDR Contact: 12116/96 SONOMA COUNTY : LUST Sites Source: Sonoma County Public Health Department Telephone: 707-525-6565
An Arrival and Departure Time Predictor for Scheduling Communication in Opportunistic IoT
Pozza, Riccardo; Georgoulas, Stylianos; Moessner, Klaus; Nati, Michele; Gluhak, Alexander; Krco, Srdjan
2016-01-01
In this article, an Arrival and Departure Time Predictor (ADTP) for scheduling communication in opportunistic Internet of Things (IoT) is presented. The proposed algorithm learns about temporal patterns of encounters between IoT devices and predicts future arrival and departure times, therefore future contact durations. By relying on such predictions, a neighbour discovery scheduler is proposed, capable of jointly optimizing discovery latency and power consumption in order to maximize communication time when contacts are expected with high probability and, at the same time, saving power when contacts are expected with low probability. A comprehensive performance evaluation with different sets of synthetic and real world traces shows that ADTP performs favourably with respect to previous state of the art. This prediction framework opens opportunities for transmission planners and schedulers optimizing not only neighbour discovery, but the entire communication process. PMID:27827909
An Arrival and Departure Time Predictor for Scheduling Communication in Opportunistic IoT.
Pozza, Riccardo; Georgoulas, Stylianos; Moessner, Klaus; Nati, Michele; Gluhak, Alexander; Krco, Srdjan
2016-11-04
In this article, an Arrival and Departure Time Predictor (ADTP) for scheduling communication in opportunistic Internet of Things (IoT) is presented. The proposed algorithm learns about temporal patterns of encounters between IoT devices and predicts future arrival and departure times, therefore future contact durations. By relying on such predictions, a neighbour discovery scheduler is proposed, capable of jointly optimizing discovery latency and power consumption in order to maximize communication time when contacts are expected with high probability and, at the same time, saving power when contacts are expected with low probability. A comprehensive performance evaluation with different sets of synthetic and real world traces shows that ADTP performs favourably with respect to previous state of the art. This prediction framework opens opportunities for transmission planners and schedulers optimizing not only neighbour discovery, but the entire communication process.
48 CFR 208.405 - Ordering procedures for Federal Supply Schedules.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Federal Supply Schedules. 208.405 Section 208.405 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 208.405 Ordering procedures for Federal Supply Schedules. In all orders...
12 CFR 407.3 - Procedures applicable to regularly scheduled meetings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Procedures applicable to regularly scheduled meetings. 407.3 Section 407.3 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES REGULATIONS GOVERNING PUBLIC OBSERVATION OF EX-IM BANK MEETINGS § 407.3 Procedures applicable to regularly scheduled...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Schedule of fees for products and services... Procedures for Payment § 1.1182 Schedule of fees for products and services provided by the Commission in connection with competitive bidding procedures. Product or service Fee amount Payment procedure On-line...
Psychological Distance to Reward: Effects of S+ Duration and the Delay Reduction It Signals
ERIC Educational Resources Information Center
Alessandri, Jerome; Stolarz-Fantino, Stephanie; Fantino, Edmund
2011-01-01
A concurrent-chains procedure was used to examine choice between segmented (two-component chained schedules) and unsegmented schedules (simple schedules) in terminal links with equal inter-reinforcement intervals. Previous studies using this kind of experimental procedure showed preference for unsegmented schedules for both pigeons and humans. In…
NASA Astrophysics Data System (ADS)
Izah Anuar, Nurul; Saptari, Adi
2016-02-01
This paper addresses the types of particle representation (encoding) procedures in a population-based stochastic optimization technique in solving scheduling problems known in the job-shop manufacturing environment. It intends to evaluate and compare the performance of different particle representation procedures in Particle Swarm Optimization (PSO) in the case of solving Job-shop Scheduling Problems (JSP). Particle representation procedures refer to the mapping between the particle position in PSO and the scheduling solution in JSP. It is an important step to be carried out so that each particle in PSO can represent a schedule in JSP. Three procedures such as Operation and Particle Position Sequence (OPPS), random keys representation and random-key encoding scheme are used in this study. These procedures have been tested on FT06 and FT10 benchmark problems available in the OR-Library, where the objective function is to minimize the makespan by the use of MATLAB software. Based on the experimental results, it is discovered that OPPS gives the best performance in solving both benchmark problems. The contribution of this paper is the fact that it demonstrates to the practitioners involved in complex scheduling problems that different particle representation procedures can have significant effects on the performance of PSO in solving JSP.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
... Construction Permits Scheduled for March 27, 2012; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM broadcast construction permits scheduled to commence on March 27, 2012. This... construction permits and seek comment on the procedures to be used for this auction. This auction is scheduled...
Suchecki, Jeanine K; Donshik, Peter; Ehlers, William H
2003-09-01
Complications associated with contact lenses range from mild to severe and occur with all lens modalities. Contact lens wear can cause a change in corneal physiology, which can lead to epithelial, stromal, and endothelial compromise. Other complications include lens deposition, allergic conjunctivitis, giant papillary conjunctivitis, peripheral infiltrates, microbial keratitis, and neovascularization. Pre-existing conditions can contribute to these complications, or they can occur in association with contact lens wear and care regimens. Patient-related factors, such as alteration of the recommended wearing or replacement schedules and noncompliance with recommended contact lens care regimens for economic reasons, convenience, or in error, contribute to contact lens-related complications and have led to difficulty in accurate determination of complication rates among the various lens wear modalities. Complications may require discontinuation of contact lenses, topical therapy, and changes in contact lens wearing schedules, materials, and care solutions. On initial lens fitting and follow-up evaluations, practitioners should review contact lens replacement and cleaning regimens with patients and discuss complications. To avoid serious complications, patients should be reminded to remove their contact lenses as soon as ocular irritation occurs, and to call their eye care practitioner immediately if symptoms persist.
Phase-shifting human circadian rhythms: influence of sleep timing, social contact and light exposure
NASA Technical Reports Server (NTRS)
Duffy, J. F.; Kronauer, R. E.; Czeisler, C. A.
1996-01-01
1. Both the timing of behavioural events (activity, sleep and social interactions) and the environmental light-dark cycle have been reported to contribute to entrainment of human circadian rhythms to the 24 h day. Yet, the relative contribution of those putative behavioural synchronizers to that of light exposure remains unclear. 2. To investigate this, we inverted the schedule of rest, sedentary activity and social contact of thirty-two young men either with or without exposure to bright light. 3. On this inverted schedule, the endogenous component of the core temperature rhythm of subjects who were exposed to bright light showed a significant phase shift, demonstrating that they were adapting to the new schedule. In contrast, the core temperature rhythm of subjects who were not exposed to bright light moved on average 0.2 h later per day and after 10 days had not significantly adapted to the new schedule. 4. The direction of phase shift in the groups exposed to bright light was dependent on the time of bright light exposure, while control subjects drifted to a later hour regardless of the timing of their schedule of sleep timing, social contact and meals. 5. These results support the concept that the light-dark cycle is the most important synchronizer of the human circadian system. They suggest that inversion of the sleep-wake, rest-activity and social contact cycles provides relatively minimal drive for resetting the human circadian pacemaker. 6. These data indicate that interventions designed to phase shift human circadian rhythms for adjustment to time zone changes or altered work schedules should focus on properly timed light exposure.
Lopez, F; Pereira, C
1985-03-01
Two experiments used response-restriction procedures in order to test the independence of the factors determining response rate and the factors determining the size of the postreinforcement pause on interval schedules. Responding was restricted by response-produced blackout or by retracting the lever. In Experiment 1 with a Conjunctive FR 1 FT schedule, the blackout procedure reduced the postreinforcement pause more than the lever-retraction procedure did, and both procedures produced shorter pauses than did the schedule without response restriction. In Experiment 2 the interreinforcement interval was also manipulated, and the size of the pause was an increasing function of the interreinforcement interval, but the rate of increase was lower than that produced by fixed interval schedules of comparable interval durations. The assumption of functional independence of the postreinforcement pause and terminal rate in fixed interval schedules is questioned since data suggest that pause reductions resulted from constraining variation in response number compared to equivalent periodic schedules in which response number was allowed to vary. Copyright © 1985. Published by Elsevier B.V.
76 FR 18262 - January 2011 Pay Schedules
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... OFFICE OF PERSONNEL MANAGEMENT January 2011 Pay Schedules AGENCY: U.S. Office of Personnel... civilian employee pay schedules are not adjusted in 2011 and remain at 2010 levels. This notice serves as documentation for the public record. FOR FURTHER INFORMATION CONTACT: Lisa Dismond, Pay and Leave, Employee...
NASA Technical Reports Server (NTRS)
Jaap, John; Davis, Elizabeth; Richardson, Lea
2004-01-01
Planning and scheduling systems organize tasks into a timeline or schedule. Tasks are logically grouped into containers called models. Models are a collection of related tasks, along with their dependencies and requirements, that when met will produce the desired result. One challenging domain for a planning and scheduling system is the operation of on-board experiments for the International Space Station. In these experiments, the equipment used is among the most complex hardware ever developed; the information sought is at the cutting edge of scientific endeavor; and the procedures are intricate and exacting. Scheduling is made more difficult by a scarcity of station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling International Space Station experiment operations calls for a maximally expressive modeling schema.
Maximally Expressive Modeling of Operations Tasks
NASA Technical Reports Server (NTRS)
Jaap, John; Richardson, Lea; Davis, Elizabeth
2002-01-01
Planning and scheduling systems organize "tasks" into a timeline or schedule. The tasks are defined within the scheduling system in logical containers called models. The dictionary might define a model of this type as "a system of things and relations satisfying a set of rules that, when applied to the things and relations, produce certainty about the tasks that are being modeled." One challenging domain for a planning and scheduling system is the operation of on-board experiments for the International Space Station. In these experiments, the equipment used is among the most complex hardware ever developed, the information sought is at the cutting edge of scientific endeavor, and the procedures are intricate and exacting. Scheduling is made more difficult by a scarcity of station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling International Space Station experiment operations calls for a "maximally expressive" modeling schema.
78 FR 46794 - Federal Acquisition Regulation; Update to Biobased Reporting Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
... contact. DATE: Effective: September 3, 2013 FOR FURTHER INFORMATION CONTACT: Ms. Marissa Petrusek... publication schedules, contact the Regulatory Secretariat at 202-501-4755. Please cite FAC 2005-69, FAR Case... Web site rather than to an agency point of contact. For reporting in 2012, the Department of...
78 FR 71528 - Federal Management Regulation (FMR); Transportation Payment and Audit
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-29
... and contact information of the Civilian Board of Contract Appeals (CBCA) from the previously named... INFORMATION CONTACT: For clarification of content, contact Lee Gregory, Office of Government-wide Policy, at... schedules, contact the Regulatory Secretariat (MVCB), 1800 F Street NW., Washington, DC 20405, 202-501-4755...
Hackenberg, T D; Hineline, P N
1992-01-01
Pigeons chose between two schedules of food presentation, a fixed-interval schedule and a progressive-interval schedule that began at 0 s and increased by 20 s with each food delivery provided by that schedule. Choosing one schedule disabled the alternate schedule and stimuli until the requirements of the chosen schedule were satisfied, at which point both schedules were again made available. Fixed-interval duration remained constant within individual sessions but varied across conditions. Under reset conditions, completing the fixed-interval schedule not only produced food but also reset the progressive interval to its minimum. Blocks of sessions under the reset procedure were interspersed with sessions under a no-reset procedure, in which the progressive schedule value increased independent of fixed-interval choices. Median points of switching from the progressive to the fixed schedule varied systematically with fixed-interval value, and were consistently lower during reset than during no-reset conditions. Under the latter, each subject's choices of the progressive-interval schedule persisted beyond the point at which its requirements equaled those of the fixed-interval schedule at all but the highest fixed-interval value. Under the reset procedure, switching occurred at or prior to that equality point. These results qualitatively confirm molar analyses of schedule preference and some versions of optimality theory, but they are more adequately characterized by a model of schedule preference based on the cumulated values of multiple reinforcers, weighted in inverse proportion to the delay between the choice and each successive reinforcer. PMID:1548449
Centralized mission planning and scheduling system for the Landsat Data Continuity Mission
Kavelaars, Alicia; Barnoy, Assaf M.; Gregory, Shawna; Garcia, Gonzalo; Talon, Cesar; Greer, Gregory; Williams, Jason; Dulski, Vicki
2014-01-01
Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Schedule of charges for equipment approval, experimental radio services (or service). 1.1103 Section 1.1103 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Schedule of Statutory Charges and Procedures for Payment § 1.1103...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Schedule for Diesel Cycle Vehicles Equipped With Periodically Regenerating Trap Oxidizer Systems Certifying...
DOT National Transportation Integrated Search
2013-01-01
Each railroad covered by 49 CFR 228.407 must perform an analysis of the work schedules of its train employees who are engaged in commuter or intercity rail passenger transportation and identify those schedules that, if worked by such a train employee...
75 FR 55965 - Adoption of Updated EDGAR Filer Manual
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-15
... (Monthly Schedule of Portfolio Holdings of Money Market Funds) and any amendments to the form. The EDGAR... Schedule of Portfolio Holdings of Money Market Funds) contact Adam Glazer, Senior Counsel, or C. Hunter...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Appendix XV to Part 86—Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test... = Total number of regeneration emission tests. (Subscript “s” refers to standard test schedule) 5. Refer...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Appendix XV to Part 86—Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test... = Total number of regeneration emission tests. (Subscript “s” refers to standard test schedule) 5. Refer...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Appendix XV to Part 86—Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test... = Total number of regeneration emission tests. (Subscript “s” refers to standard test schedule) 5. Refer...
78 FR 58342 - Proposed Fee Schedule for Commercial Filming and Still Photography Permits
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... ; put ``Commercial Filming Fee Schedule'' in the subject line. Mail: Lee Dickinson, Special Park Uses... FURTHER INFORMATION CONTACT: Lee Dickinson, National Park Service at 202-513-7092 or by email at lee...
78 FR 16523 - Notice of Public Meeting: Concessions Management Advisory Board
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
... previously scheduled for March 20 is cancelled. FOR FURTHER INFORMATION CONTACT: For further information contact Deborah Harvey, Acting Chief, National Park Service, Commercial Services Program, 1201 Eye Street...
29 CFR 42.10 - Farm labor contact persons and regional coordinators (OSHA).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 1 2011-07-01 2011-07-01 false Farm labor contact persons and regional coordinators (OSHA... contact persons and regional coordinators (OSHA). (a) OSHA Area Directors shall be responsible for... taken; and (2) migrant farmworker camp inspections are scheduled promptly. (b) OSHA Area Directors shall...
10 CFR 474.4 - Test procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT OF...; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... Schedule and Urban Dynamometer Driving Schedule test cycles at 40 CFR parts 86 and 600. (b) The “Special...
Preclinical Determinants of Drug Choice under Concurrent Schedules of Drug Self-Administration
Banks, Matthew L.; Negus, S. Stevens
2012-01-01
Drug self-administration procedures have played a critical role in the experimental analysis of psychoactive compounds, such as cocaine, for over 50 years. While there are numerous permutations of this procedure, this paper will specifically focus on choice procedures using concurrent schedules of intravenous drug self-administration. The aims of this paper are to first highlight the evolution of drug choice procedures and then review the subsequent preclinical body of literature utilizing these choice procedures to understand the environmental, pharmacological, and biological determinants of the reinforcing stimulus effects of drugs. A main rationale for this paper is our proposition that choice schedules are underutilized in investigating the reinforcing effects of drugs in assays of drug self-administration. Moreover, we will conclude with potential future directions and unexplored scientific space for the use of drug choice procedures. PMID:23243420
Production Scheduling for Rehabilitation Workshops.
ERIC Educational Resources Information Center
Hietala, David A.
This publication examines production scheduling procedures for sheltered workshops. The manual includes three major sections: (1) the importance and benefits of production scheduling; (2) how-to information on performing basic scheduling in the workshop; and (3) answers to the question, What makes production scheduling work? The scheduling…
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Scheduling. 665.21 Section 665.21 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF... available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting the...
76 FR 50736 - HIT Standards Committee's Workgroup Meetings; Notice of Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-16
... additional information and schedules as it becomes available. Contact Person: Judy Sparrow, Office of the...: judy.sparrow@hhs.gov Please call the contact person for up-to-date information on these meetings. A... special accommodations due to a disability, please contact Judy Sparrow at least seven (7) days in advance...
Code of Federal Regulations, 2011 CFR
2011-10-01
... authorize other agencies to award schedule contracts and publish schedules. For example, the Department of... CONTRACTING FEDERAL SUPPLY SCHEDULE CONTRACTING Federal Supply Schedule Program 38.101 General. (a) The... discounts. Indefinite-delivery contracts are awarded using competitive procedures to firms. The firms...
Dynamic Routing for Delay-Tolerant Networking in Space Flight Operations
NASA Technical Reports Server (NTRS)
Burleigh, Scott C.
2008-01-01
Contact Graph Routing (CGR) is a dynamic routing system that computes routes through a time-varying topology composed of scheduled, bounded communication contacts in a network built on the Delay-Tolerant Networking (DTN) architecture. It is designed to support operations in a space network based on DTN, but it also could be used in terrestrial applications where operation according to a predefined schedule is preferable to opportunistic communication, as in a low-power sensor network. This paper will describe the operation of the CGR system and explain how it can enable data delivery over scheduled transmission opportunities, fully utilizing the available transmission capacity, without knowing the current state of any bundle protocol node (other than the local node itself) and without exhausting processing resources at any bundle router.
4 CFR 28.55 - Scheduling the hearing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 4 Accounts 1 2010-01-01 2010-01-01 false Scheduling the hearing. 28.55 Section 28.55 Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES GOVERNMENT ACCOUNTABILITY OFFICE PERSONNEL APPEALS BOARD; PROCEDURES APPLICABLE TO CLAIMS CONCERNING EMPLOYMENT PRACTICES AT THE GOVERNMENT ACCOUNTABILITY OFFICE...
40 CFR 305.30 - Scheduling the hearing.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Scheduling the hearing. 305.30 Section 305.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...
40 CFR 305.30 - Scheduling the hearing.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Scheduling the hearing. 305.30 Section 305.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...
40 CFR 305.30 - Scheduling the hearing.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Scheduling the hearing. 305.30 Section 305.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...
van den Berg, M H; Ronday, H K; Peeters, A J; Voogt-van der Harst, E M; Munneke, M; Breedveld, F C; Vliet Vlieland, T P M
2007-03-01
To assess the engagement in and satisfaction with an Internet-mediated physical activity intervention with individual supervision in patients with rheumatoid arthritis (RA). The intervention studied was one of the two strategies aimed at enhancing physical activity in RA patients that were being compared in a randomized controlled trial. A total of 82 patients, all experienced in using Internet and e-mail and registered at three different rheumatology out-patient clinics, were randomly allocated to the Internet-mediated individualized intervention (52 weeks). They had access to personal physical activity schedules and received individual supervision by a physical therapist by means of weekly e-mail feedback. In addition, telephone contacts, an online discussion forum, six face-to-face group meetings and electronic newsletters were offered. Besides registration of returned physical activity schedules, engagement and satisfaction were measured through questionnaires. The median physical activity schedule return rate of the 82 participants was 55%. The mean number of patients logging into the website at least once a week was 53 (70%) over 12 months. Of all patients, 69 returned the questionnaires (response 84%). Telephone contacts were used by 38/67 patients (57%), the mean (SD) number of attended group meetings was 3.1 (1.5) and the discussion forum comprised 15 posted messages. Overall, the proportions of patients being (very) satisfied with the amount of e-mail contacts, telephone contacts, usefulness of website information, physical activity schedules, group meetings and website layout were >/=85%. A smaller proportion of patients were satisfied with the links to other websites (68%), the newsletters (55%) and the online discussion forum (32%). Physical activity schedules with weekly feedback by e-mail, telephone contacts and a limited number of group meetings were frequently used website tools and modes of communication of an Internet-based physical activity intervention, with high-satisfaction rates from RA patients. Discussion forum and newsletters were less used and appreciated. Caution should be taken when extrapolating the results found to groups of patients who are not experienced Internet and e-mail users or patients with more severe physical disabilities.
A field test of procedures for evaluating and scheduling white-pine weevil control
Robert P. Ford; Robert L. Talerico; D. Gordon Mott
1965-01-01
Procedures have recently been developed that permit economic and biological information to be integrated in making decisions about the need for control against the white-pine weevil, and in scheduling control in young white pine plantations. The procedures are based upon studies of the magnitude of economic losses that result from weevil attack in white pine and upon...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-17
...-0001; Sequence 21] General Services Administration Acquisition Regulation: Modifications (Multiple... Modifications (Multiple Award Schedule). DATES: Submit comments on or before: February 15, 2013. FOR FURTHER INFORMATION CONTACT: Ms. Dana Munson, General Services Acquisition Policy Division, GSA, (202) 357-9652 or...
76 FR 78702 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-19
... p.m., Eastern Time. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other... the closing of the Sherwood, Michigan post office has been filed. It identifies preliminary steps and provides a procedural schedule. Publication of this document will allow the Postal Service, petitioners...
78 FR 64533 - Silica Bricks and Shapes From China; Revised Schedule for the Subject Investigation
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-29
... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-1205 (Final)] Silica Bricks and Shapes From China; Revised Schedule for the Subject Investigation AGENCY: United States International Trade Commission. ACTION: Notice. DATES: Effective Date: October 23, 2013. FOR FURTHER INFORMATION CONTACT: Cynthia...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-26
...; Modifications 552.243-72 (Multiple Award Schedules) AGENCY: Office of Acquisition Policy, General Services... information collection requirement regarding the Modifications (Multiple Award Schedule) clause. DATES: Submit comments on or before: April 25, 2013. FOR FURTHER INFORMATION CONTACT: Ms. Dana Munson, General Services...
77 FR 67835 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-14
... Records Management Services (ACNR) using one of the following means: Mail: NARA (ACNR), 8601 Adelphi Road... their request. FOR FURTHER INFORMATION CONTACT: Margaret Hawkins, Director, Records Management Services... indicates agency- wide applicability in the case of schedules that cover records that may be accumulated...
78 FR 2293 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-10
... Records Management Services (ACNR) using one of the following means: Mail: NARA (ACNR), 8601 Adelphi Road... their request. FOR FURTHER INFORMATION CONTACT: Margaret Hawkins, Director, Records Management Services... applicability in the case of schedules that cover records that may be accumulated throughout an agency. This...
Creation of the selection list for the Experiment Scheduling Program (ESP)
NASA Technical Reports Server (NTRS)
Deuermeyer, B. L.; Shannon, R. E.; Underbrink, A. J., Jr.
1986-01-01
The efforts to develop a procedure to construct selection groups to augment the Experiment Scheduling Program (ESP) are summarized. Included is a User's Guide and a sample scenario to guide in the use of the software system that implements the developed procedures.
76 FR 76449 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-07
... steps and provides a procedural schedule. Publication of this document will allow the Postal Service... Postal Service); December 27, 2011, 4:30 p.m., Eastern Time: Deadline for notices to intervene. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other dates of interest. ADDRESSES: Submit...
76 FR 76452 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-07
... steps and provides a procedural schedule. Publication of this document will allow the Postal Service... Postal Service); December 27, 2011, 4:30 p.m., Eastern Time: Deadline for notices to intervene. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other dates of interest. ADDRESSES: Submit...
76 FR 68235 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-03
... steps and provides a procedural schedule. Publication of this document will allow the Postal Service... Postal Service); November 22, 2011, 4:30 p.m., Eastern Time: Deadline for notices to intervene. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other dates of interest. ADDRESSES: Submit...
76 FR 78953 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-20
... p.m., Eastern Time. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other... the closing of the Mount Union, Iowa post office has been filed. It identifies preliminary steps and provides a procedural schedule. Publication of this document will allow the Postal Service, petitioners...
76 FR 72457 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-23
... steps and provides a procedural schedule. Publication of this document will allow the Postal Service... Postal Service); December 12, 2011, 4:30 p.m., Eastern Time: Deadline for notices to intervene. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other dates of interest. ADDRESSES: Submit...
76 FR 68234 - Post Office Closing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-03
... steps and provides a procedural schedule. Publication of this document will allow the Postal Service... Postal Service); November 22, 2011, 4:30 p.m., Eastern Time: Deadline for notices to intervene. See the Procedural Schedule in the SUPPLEMENTARY INFORMATION section for other dates of interest. ADDRESSES: Submit...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-04
... Smith at the address below. Please contact Ms. Smith to schedule an inspection. FOR FURTHER INFORMATION CONTACT: Diane Smith, Environmental Protection Specialist, Water Quality Protection Division, U.S. EPA...
Gain scheduling - Potential hazards and possible remedies
NASA Technical Reports Server (NTRS)
Shamma, Jeff S.; Athans, Michael
1991-01-01
A common gain scheduling rule-of-thumb is to schedule on a slow variable. In this work, it is shown how current gain scheduling practice is necessarily limited to slow variations in the scheduling variable. These limitations are revealed to be consequences of fundamental control concepts. Furthermore, it is shown how a formulation of the gain scheduling procedure can lead toward ultimately removing these restrictions.
ERIC Educational Resources Information Center
Jones, Danson; Macias, Rosemarie Lillianne; Gold, Paul B.; Barreira, Paul; Fisher, William
2008-01-01
This study compared parental psychiatric symptom severity, and the absence or presence of severe substance abuse, as predictors of contact with minor children for a representative sample of adults with diagnoses of serious mental illness (N = 45). Child contact and psychiatric symptom severity were measured during regularly scheduled 6-month…
ERIC Educational Resources Information Center
College and University, 1977
1977-01-01
Proceedings of AACRAO's 63rd annual meeting cover: calendar conversion; publications economy; class schedules; fraudulent transcripts; student retention; student ID numbers; veteran student reporting; financial aid reporting; faculty activity analyses; time management; registration; and transcript forms for nontraditional programs. (LBH)
A Practical Variation of a Multiple-Schedule Procedure: Brief Schedule-Correlated Stimuli
ERIC Educational Resources Information Center
Tiger, Jeffrey H.; Hanley, Gregory P.; Larsen, Kylie M.
2008-01-01
Multiple schedules using continuous discriminative stimuli have been used to minimize children's disruptive requesting for teacher attention (e.g., colored floral leis; Tiger & Hanley, 2004; Tiger, Hanley, & Heal, 2006). The present study evaluated the effectiveness of, and children's preferences for, two multiple-schedule arrangements in which…
NASA Astrophysics Data System (ADS)
Wang, M.; Cole, M. O. T.; Keogh, P. S.
2017-11-01
A new approach for the recovery of contact-free levitation of a rotor supported by active magnetic bearings (AMB) is assessed through control strategy design, system modelling and experimental verification. The rotor is considered to make contact with a touchdown bearing (TDB), which may lead to entrapment in a bi-stable nonlinear response. A linear matrix inequality (LMI) based gain-scheduling H∞ control technique is introduced to recover the rotor to a contact-free state. The controller formulation involves a time-varying effective stiffness parameter, which can be evaluated in terms of forces transmitted through the TDB. Rather than measuring these forces directly, an observer is introduced with a model of the base structure to transform base acceleration signals using polytopic coordinates for controller adjustment. Force transmission to the supporting base structure will occur either through an AMB alone without contact, or through the AMB and TDB with contact and this must be accounted for in the observer design. The controller is verified experimentally in terms of (a) non-contact robust stability and vibration suppression performance; (b) control action for contact-free recovery at typical running speeds with various unbalance and TDB misalignment conditions; and (c) coast-down experimental tests. The results demonstrate the effectiveness of the AMB control action whenever it operates within its dynamic load capacity.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-04
... INTERNATIONAL TRADE COMMISSION [Investigation Nos. 701-TA-488 and 731-TA-1199-1200 (Final)] Large Residential Washers From Korea and Mexico; Revised Schedule for the Subject Investigations AGENCY: United... information on this matter by contacting the Commission's TDD terminal on 202-205-1810. Persons with mobility...
Transmission Scheduling and Routing Algorithms for Delay Tolerant Networks
NASA Technical Reports Server (NTRS)
Dudukovich, Rachel; Raible, Daniel E.
2016-01-01
The challenges of data processing, transmission scheduling and routing within a space network present a multi-criteria optimization problem. Long delays, intermittent connectivity, asymmetric data rates and potentially high error rates make traditional networking approaches unsuitable. The delay tolerant networking architecture and protocols attempt to mitigate many of these issues, yet transmission scheduling is largely manually configured and routes are determined by a static contact routing graph. A high level of variability exists among the requirements and environmental characteristics of different missions, some of which may allow for the use of more opportunistic routing methods. In all cases, resource allocation and constraints must be balanced with the optimization of data throughput and quality of service. Much work has been done researching routing techniques for terrestrial-based challenged networks in an attempt to optimize contact opportunities and resource usage. This paper examines several popular methods to determine their potential applicability to space networks.
A new procedure for calculating contact stresses in gear teeth
NASA Technical Reports Server (NTRS)
Somprakit, Paisan; Huston, Ronald L.
1991-01-01
A numerical procedure for evaluating and monitoring contact stresses in meshing gear teeth is discussed. The procedure is intended to extend the range of applicability and to improve the accuracy of gear contact stress analysis. The procedure is based upon fundamental solution from the theory of elasticity. It is an iterative numerical procedure. The method is believed to have distinct advantages over the classical Hertz method, the finite-element method, and over existing approaches with the boundary element method. Unlike many classical contact stress analyses, friction effects and sliding are included. Slipping and sticking in the contact region are studied. Several examples are discussed. The results are in agreement with classical results. Applications are presented for spur gears.
The Composition of the Master Schedule
NASA Technical Reports Server (NTRS)
Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.
2010-01-01
Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.
Zangrillo, Amanda N; Fisher, Wayne W; Greer, Brian D; Owen, Todd M; DeSouza, Andresa A
2016-01-01
Previous research has supported functional communication training (FCT) as an effective intervention for reducing challenging behavior. Clinicians often program schedule-thinning procedures to increase the portability of the treatment (i.e., reinforcement is provided less frequently). For individuals with escape-maintained problem behavior, chained schedules have proven effective in increasing task completion and supplemental procedures may ameliorate reemergence of challenging behavior as access to reinforcement is decreased. The present study compared the use of a chained schedule-thinning procedure with and without alternative reinforcement (e.g., toys and activities) embedded in an intervention in which escape from the task is provided contingent on a request for a break. Two individuals with escape-maintained challenging behavior participated. We compared two treatment conditions, escape-only and escape-to-tangibles, using a single-subject, alternating treatments design with each treatment implemented in a distinct academic context. With the escape-to-tangibles treatment, we reached the final schedule in both contexts with both participants (4 successes out of 4 applications). We did not reach the final schedule with either participant with the escape-only intervention (0 successes out of 2 applications). The current results provided preliminary confirmation that providing positive plus negative reinforcement would decrease destructive behavior, increase compliance, and facilitate reinforcer-schedule thinning.
Zangrillo, Amanda N.; Fisher, Wayne W.; Greer, Brian D.; Owen, Todd M.; DeSouza, Andresa A.
2016-01-01
Objective Previous research has supported functional communication training (FCT) as an effective intervention for reducing challenging behavior. Clinicians often program schedule-thinning procedures to increase the portability of the treatment (i.e., reinforcement is provided less frequently). For individuals with escape-maintained problem behavior, chained schedules have proven effective in increasing task completion and supplemental procedures may ameliorate reemergence of challenging behavior as access to reinforcement is decreased. The present study compared the use of a chained schedule-thinning procedure with and without alternative reinforcement (e.g., toys and activities) embedded in an intervention in which escape from the task is provided contingent on a request for a break. Method Two individuals with escape-maintained challenging behavior participated. We compared two treatment conditions, escape-only and escape-to-tangibles, using a single-subject, alternating treatments design with each treatment implemented in a distinct academic context. Results With the escape-to-tangibles treatment, we reached the final schedule in both contexts with both participants (4 successes out of 4 applications). We did not reach the final schedule with either participant with the escape-only intervention (0 successes out of 2 applications). Conclusion The current results provided preliminary confirmation that providing positive plus negative reinforcement would decrease destructive behavior, increase compliance, and facilitate reinforcer-schedule thinning. PMID:28626579
Stochastic online appointment scheduling of multi-step sequential procedures in nuclear medicine.
Pérez, Eduardo; Ntaimo, Lewis; Malavé, César O; Bailey, Carla; McCormack, Peter
2013-12-01
The increased demand for medical diagnosis procedures has been recognized as one of the contributors to the rise of health care costs in the U.S. in the last few years. Nuclear medicine is a subspecialty of radiology that uses advanced technology and radiopharmaceuticals for the diagnosis and treatment of medical conditions. Procedures in nuclear medicine require the use of radiopharmaceuticals, are multi-step, and have to be performed under strict time window constraints. These characteristics make the scheduling of patients and resources in nuclear medicine challenging. In this work, we derive a stochastic online scheduling algorithm for patient and resource scheduling in nuclear medicine departments which take into account the time constraints imposed by the decay of the radiopharmaceuticals and the stochastic nature of the system when scheduling patients. We report on a computational study of the new methodology applied to a real clinic. We use both patient and clinic performance measures in our study. The results show that the new method schedules about 600 more patients per year on average than a scheduling policy that was used in practice by improving the way limited resources are managed at the clinic. The new methodology finds the best start time and resources to be used for each appointment. Furthermore, the new method decreases patient waiting time for an appointment by about two days on average.
[Development of an ophthalmological clinical information system for inpatient eye clinics].
Kortüm, K U; Müller, M; Babenko, A; Kampik, A; Kreutzer, T C
2015-12-01
In times of increased digitalization in healthcare, departments of ophthalmology are faced with the challenge of introducing electronic clinical health records (EHR); however, specialized software for ophthalmology is not available with most major EHR sytems. The aim of this project was to create specific ophthalmological user interfaces for large inpatient eye care providers within a hospitalwide EHR. Additionally the integration of ophthalmic imaging systems, scheduling and surgical documentation should be achieved. The existing EHR i.s.h.med (Siemens, Germany) was modified using advanced business application programming (ABAP) language to create specific ophthalmological user interfaces for reproduction and moreover optimization of the clinical workflow. A user interface for documentation of ambulatory patients with eight tabs was designed. From June 2013 to October 2014 a total of 61,551 patient contact details were documented. For surgical documentation a separate user interface was set up. Digital clinical orders for documentation of registration and scheduling of operations user interfaces were also set up. A direct integration of ophthalmic imaging modalities could be established. An ophthalmologist-orientated EHR for outpatient and surgical documentation for inpatient clinics was created and successfully implemented. By incorporation of imaging procedures the foundation of future smart/big data analyses was created.
Surgical demand scheduling: a review.
Magerlein, J M; Martin, J B
1978-01-01
This article reviews the literature on scheduling of patient demand for surgery and outlines an approach to improving overall performance of hospital surgical suites. Reported scheduling systems are categorized into those that schedule patients in advance of the surgical date and those that schedule available patients on the day of surgery. Approaches to estimating surgical procedure times are also reviewed, and the article concludes with a discussion of the failure to implement the majority of reported scheduling schemes. PMID:367987
78 FR 9938 - Ethyl Alcohol for Fuel Use: Determination of the Base Quantity of Imports
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-12
... to articles entered before the expiration of the effective period of Harmonized Tariff Schedule of... docket (EDIS) at http://edis.usitc.gov . FOR FURTHER INFORMATION CONTACT: For information specific to... the Commission's Office of Industries. For information on legal aspects of the investigation contact...
78 FR 33447 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-04
...-12-MR-005) NEWS MEDIA CONTACT: Telephone: (202) 314-6100. The press and public may enter the NTSB... ``News & Events'' on the NTSB home page at www.ntsb.gov . Schedule updates including weather-related... or by email at [email protected] . FOR MEDIA INFORMATION CONTACT: Terry Williams, at (202) 314-6100 or...
78 FR 34676 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-10
...-MR-005) NEWS MEDIA CONTACT: Telephone: (202) 314-6100. The press and public may enter the NTSB... ``News & Events'' on the NTSB home page at www.ntsb.gov . Schedule updates including weather-related..., (202) 314-6403 or by email at [email protected] . FOR MEDIA INFORMATION CONTACT: Terry Williams, at (202...
Epstein, Richard H; Dexter, Franklin
2015-07-01
The American Society of Anesthesiologists has embraced the concept of the Perioperative Surgical Home as a means through which anesthesiologists can add value to the health systems in which they practice. One key listed element of the Perioperative Surgical Home is to support "scheduling initiatives to reduce cancellations and increase efficiency." In this study, we explored the potential benefits of the Perioperative Surgical Home with respect to inpatient cancellations and add-on case scheduling. We evaluated 6 hypotheses related to the timing of inpatient cancellations and preoperative anesthesia evaluations. Inpatient cancellations were studied during 26 consecutive 4-week intervals between July 2012 and June 2014 at a tertiary care academic hospital. All timestamps related to scheduling, rescheduling, and cancellation activities were retrieved from the operating room (OR) case scheduling system. Timestamps when patients were seen by anesthesia residents were obtained from the preoperative evaluation system database. Batch mean methods were used to calculate means and SE. For cases cancelled, we determined whether, for "most" (>50%) cancellations, a subsequent procedure (of any type) was performed on the patient within 7 days of the cancellation. Comparisons with most and other fractions were assessed using the 1 group, 1-sided Student t test. We evaluated whether a few procedures were highly represented among the cancelled cases via the Herfindahl (Simpson's) index, comparing it with <0.15. The rate of scheduling activity was assessed by computing the number of OR scheduling office decisions in each 1-hour bin between 6:00 AM and 3:59 PM. These values were compared with ≥1 decision per hour at the study hospital. Data from 24,735 scheduled inpatient cases were assessed. Cases cancelled after 7 AM on the day before or at any time on the scheduled day of surgery accounted for 22.6% ± 0.5% (SE) of the scheduled minutes all scheduled cases, and 26.8% ± 0.4% of the case volume (i.e., number of cases). Most (83.1% ± 0.6%, P < 10) cases performed were evaluated on the day before surgery. Most (67.6% ± 1.6%, P < 10) minutes of cancelled cases were evaluated on the day before surgery. Most (62.3% ± 1.5%, P < 10) cases were seen earlier than 6:00 PM of the day before surgery. The Herfindahl index among cancelled procedures was 0.021 ± 0.001 (P < 10 compared not only to <0.15 but also to <0.05), showing large heterogeneity among the cancelled procedures. A subsequent procedure was not performed for most cancelled cases (50.6% ± 0.9% compared with >50%, P = 0.12), implying that the indication for the cancelled procedure no longer existed or the patient/family decided not to proceed with surgery. When only cancellations on the scheduled day of surgery were considered, the cancellation rate was 14.0% ± 0.3% of scheduled inpatient minutes and 11.8% ± 0.2% of scheduled inpatient cases. There were 0.59 ± 0.02 OR schedule decisions per hour per 10 ORs between 6:00 AM and 3:59 PM (P < 10, corresponding to ≥1 decision per hour at the 36 OR study hospital). The study hospital had a high inpatient cancellation rate, despite the fact that most patients whose cases were cancelled were seen by an anesthesia resident by 6:00 PM of the day before surgery. This finding suggests that further efforts to reduce the cancellations by seeing patients sooner on the day before surgery, or seeing even more patients the day before surgery, would not be an economically useful focus of the Perioperative Surgical Home. The wide heterogeneity among cancelled cases indicates that focusing on a few procedures would not materially affect the overall cancellation rate. The relatively low rate of subsequent performance of a procedure on patients whose cases had been cancelled suggests that trying to decrease the cancellation rate might be medically counterproductive. The hourly rate of decisions in the scheduling office during regular work hours on the day of surgery highlights the importance of decisions made at the OR control desk and scheduling office throughout the day to reduce the hours of overused OR time. These data suggest that efforts of the Perioperative Surgical Home related to inpatient cancellations should focus on management decision-making to mitigate the disruptions to the planned OR schedule caused by inpatient case cancellations and add-on cases, more so than on efforts to reduce inpatient cancellation rates.
Estimating Surgical Procedure Times Using Anesthesia Billing Data and Operating Room Records.
Burgette, Lane F; Mulcahy, Andrew W; Mehrotra, Ateev; Ruder, Teague; Wynn, Barbara O
2017-02-01
The median time required to perform a surgical procedure is important in determining payment under Medicare's physician fee schedule. Prior studies have demonstrated that the current methodology of using physician surveys to determine surgical times results in overstated times. To measure surgical times more accurately, we developed and validated a methodology using available data from anesthesia billing data and operating room (OR) records. We estimated surgical times using Medicare 2011 anesthesia claims and New York Statewide Planning and Research Cooperative System 2011 OR times. Estimated times were validated using data from the National Surgical Quality Improvement Program. We compared our time estimates to those used by Medicare in the fee schedule. We estimate surgical times via piecewise linear median regression models. Using 3.0 million observations of anesthesia and OR times, we estimated surgical time for 921 procedures. Correlation between these time estimates and directly measured surgical time from the validation database was 0.98. Our estimates of surgical time were shorter than the Medicare fee schedule estimates for 78 percent of procedures. Anesthesia and OR times can be used to measure surgical time and thereby improve the payment for surgical procedures in the Medicare fee schedule. © Health Research and Educational Trust.
23 CFR 140.604 - Reimbursable schedule.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Reimbursable schedule. 140.604 Section 140.604 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.604 Reimbursable schedule. Projects to be financed from other than...
23 CFR 140.604 - Reimbursable schedule.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Reimbursable schedule. 140.604 Section 140.604 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.604 Reimbursable schedule. Projects to be financed from other than...
23 CFR 140.604 - Reimbursable schedule.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Reimbursable schedule. 140.604 Section 140.604 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.604 Reimbursable schedule. Projects to be financed from other than...
23 CFR 140.604 - Reimbursable schedule.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Reimbursable schedule. 140.604 Section 140.604 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.604 Reimbursable schedule. Projects to be financed from other than...
8 CFR 1003.18 - Scheduling of cases.
Code of Federal Regulations, 2010 CFR
2010-01-01
....18 Aliens and Nationality EXECUTIVE OFFICE FOR IMMIGRATION REVIEW, DEPARTMENT OF JUSTICE GENERAL PROVISIONS EXECUTIVE OFFICE FOR IMMIGRATION REVIEW Immigration Court-Rules of Procedure § 1003.18 Scheduling of cases. (a) The Immigration Court shall be responsible for scheduling cases and providing notice to...
A heuristic approach to incremental and reactive scheduling
NASA Technical Reports Server (NTRS)
Odubiyi, Jide B.; Zoch, David R.
1989-01-01
An heuristic approach to incremental and reactive scheduling is described. Incremental scheduling is the process of modifying an existing schedule if the initial schedule does not meet its stated initial goals. Reactive scheduling occurs in near real-time in response to changes in available resources or the occurrence of targets of opportunity. Only minor changes are made during both incremental and reactive scheduling because a goal of re-scheduling procedures is to minimally impact the schedule. The described heuristic search techniques, which are employed by the Request Oriented Scheduling Engine (ROSE), a prototype generic scheduler, efficiently approximate the cost of reaching a goal from a given state and effective mechanisms for controlling search.
A Comparison of Declarative and Hybrid Declarative-Procedural Models for Rover Operations
NASA Technical Reports Server (NTRS)
Knight, Russell; Rabideau, Gregg; Lenda, Matthew; Maldague, Pierre
2012-01-01
The MAPGEN [2] (Mixed-initiative Activity Plan GENerator) planning system is a great example of a hybrid procedural/declarative system where the advantages of each are leveraged to produce an effective planner/scheduler for Mars Exploration Rover tactical planning. We explore the adaptation of the same domain to an entirely declarative planning system (ASPEN [4] Activity Scheduling and Planning ENvironment), and demonstrate that, with some translation, much of the procedural knowledge encoding is amenable to a declarative knowledge encoding.
Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) schedule plan
NASA Technical Reports Server (NTRS)
1994-01-01
This report describes Aerojet's methods and procedures used to control and administer contractual schedules for the EOS/AMSU-A program. Included are the following: the master, intermediate, and detail schedules; critical path analysis; and the total program logic network diagrams.
32 CFR 169a.8 - Inventory and review schedule (Report Control Symbol DD-P&L(A)).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 1 2011-07-01 2011-07-01 false Inventory and review schedule (Report Control Symbol DD-P&L(A)). 169a.8 Section 169a.8 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Procedures § 169a.8 Inventory...
32 CFR 169a.8 - Inventory and review schedule (Report Control Symbol DD-P&L(A)).
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 1 2013-07-01 2013-07-01 false Inventory and review schedule (Report Control Symbol DD-P&L(A)). 169a.8 Section 169a.8 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Procedures § 169a.8 Inventory...
32 CFR 169a.8 - Inventory and review schedule (Report Control Symbol DD-P&L(A)).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 1 2010-07-01 2010-07-01 false Inventory and review schedule (Report Control Symbol DD-P&L(A)). 169a.8 Section 169a.8 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Procedures § 169a.8 Inventory...
Influence of temporal context on value in the multiple-chains and successive-encounters procedures.
O'Daly, Matthew; Angulo, Samuel; Gipson, Cassandra; Fantino, Edmund
2006-05-01
This set of studies explored the influence of temporal context across multiple-chain and multiple-successive-encounters procedures. Following training with different temporal contexts, the value of stimuli sharing similar reinforcement schedules was assessed by presenting these stimuli in concurrent probes. The results for the multiple-chain schedule indicate that temporal context does impact the value of a conditioned reinforcer consistent with delay-reduction theory, such that a stimulus signaling a greater reduction in delay until reinforcement has greater value. Further, nonreinforced stimuli that are concurrently presented with the preferred terminal link also have greater value, consistent with value transfer. The effects of context on value for conditions with the multiple-successive-encounters procedure, however, appear to depend on whether the search schedule or alternate handling schedule was manipulated, as well as on whether the tested stimuli were the rich or lean schedules in their components. Overall, the results help delineate the conditions under which temporal context affects conditioned-reinforcement value (acting as a learning variable) and the conditions under which it does not (acting as a performance variable), an issue of relevance to theories of choice.
40 CFR 86.535-90 - Dynamometer procedure.
Code of Federal Regulations, 2014 CFR
2014-07-01
... minutes. Engine startup (with all accessories turned off), operation over the driving schedule, and engine... driving schedule complete the hot start test. The exhaust emissions are diluted with ambient air and a... Administrator. (d) Practice runs over the prescribed driving schedule may be performed at test points, provided...
40 CFR 86.535-90 - Dynamometer procedure.
Code of Federal Regulations, 2011 CFR
2011-07-01
... minutes. Engine startup (with all accessories turned off), operation over the driving schedule, and engine... driving schedule complete the hot start test. The exhaust emissions are diluted with ambient air and a... Administrator. (d) Practice runs over the prescribed driving schedule may be performed at test points, provided...
40 CFR 86.535-90 - Dynamometer procedure.
Code of Federal Regulations, 2012 CFR
2012-07-01
... minutes. Engine startup (with all accessories turned off), operation over the driving schedule, and engine... driving schedule complete the hot start test. The exhaust emissions are diluted with ambient air and a... Administrator. (d) Practice runs over the prescribed driving schedule may be performed at test points, provided...
40 CFR 86.535-90 - Dynamometer procedure.
Code of Federal Regulations, 2013 CFR
2013-07-01
... minutes. Engine startup (with all accessories turned off), operation over the driving schedule, and engine... driving schedule complete the hot start test. The exhaust emissions are diluted with ambient air and a... Administrator. (d) Practice runs over the prescribed driving schedule may be performed at test points, provided...
Project Physics Teacher Guide 1, Concepts of Motion.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
Teaching procedures of Project Physics Unit 1 are presented in this manual to help teachers make effective use of learning materials. Curriculum objectives are discussed in connection with instructional materials, suggested year time schedules, multi-media schedules, schedule blocks, resource charts, and experiment summaries. Brief analyses are…
Andreae, Michael H; Nair, Singh; Gabry, Jonah S; Goodrich, Ben; Hall, Charles; Shaparin, Naum
2017-11-01
We investigated if human reminder phone calls in the patient's preferred language increase adherence with scheduled appointments in an inner-city chronic pain clinic. We hypothesized that language and cultural incongruence is the underlying mechanism to explain poor attendance at clinic appointments in underserved Hispanic populations. Pragmatic randomized controlled clinical trial SETTING: Innercity academic chronic pain clinic with a diverse, predominantly African-American and Hispanic population PATIENTS: All (n=963) adult patients with a scheduled first appointment between October 2014 and October 2015 at the Montefiore Pain Center in the Bronx, New York were enrolled. Patients were randomized to receive a human reminder call in their preferred language before their appointment, or no contact. We recorded patients' demographic characteristics and as primary outcome attendance as scheduled, failure to attend and/or cancellation calls. We fit Bayesian and classical multinomial logistic regression models to test if the intervention improved adherence with scheduled appointments. Among the 953 predominantly African American and Hispanic/Latino patients, 475 patients were randomly selected to receive a language-congruent, human reminder call, while 478 were assigned to receive no prior contact, (after we excluded 10 patients, scheduled for repeat appointments). In the experimental group, 275 patients adhered to their scheduled appointment, while 84 cancelled and 116 failed to attend. In the control group, 249 patients adhered to their scheduled appointment, 31 cancelled and 198 failed to attend. Human phone reminders in the preferred language increased adherence (RR 1.89, CI95% [1.42, 1.42], (p<0.01). The intervention seemed particularly effective in Hispanic patients, supporting our hypothesis of cultural congruence as possible underlying mechanism. Human reminder phone calls prior in the patient's preferred language increased adherence with scheduled appointments. The intervention facilitated access to much needed care in an ethnically diverse, resource poor population, presumably by overcoming language barriers. Copyright © 2017 Elsevier Inc. All rights reserved.
Evaluations of Some Scheduling Algorithms for Hard Real-Time Systems
1990-06-01
construct because the mechanism is a dispatching procedure. Since all nonpreemptive schedules are contained in the set of all preemptive schedules, the...optimal value of Tmax in the preemptive case is at least a lower bound on the optimal Tmax for the nonpreemptive schedules. This principle is the basis...23 b. Nonpreemptable Version .............................................. 24 4. The Minimize Maximum Tardiness with Earliest Start
40 CFR 86.135-90 - Dynamometer procedure.
Code of Federal Regulations, 2012 CFR
2012-07-01
... startup and operation over the first 505 seconds of the driving schedule complete the hot start test. The... 505 seconds of the driving schedule complete the hot start test. The exhaust emissions are diluted... over the prescribed driving schedule may be performed at test point, provided an emission sample is not...
40 CFR 86.135-90 - Dynamometer procedure.
Code of Federal Regulations, 2013 CFR
2013-07-01
... startup and operation over the first 505 seconds of the driving schedule complete the hot start test. The... 505 seconds of the driving schedule complete the hot start test. The exhaust emissions are diluted... over the prescribed driving schedule may be performed at test point, provided an emission sample is not...
40 CFR 78.13 - Scheduling orders and pre-hearing conferences.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Scheduling orders and pre-hearing conferences. 78.13 Section 78.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPEAL PROCEDURES § 78.13 Scheduling orders and pre-hearing conferences. (a) If a...
SMS text messaging improves outpatient attendance.
Downer, Sean R; Meara, John G; Da Costa, Annette C; Sethuraman, Kannan
2006-08-01
To evaluate the operational and financial efficacy of sending short message service (SMS) text message reminders to the mobile telephones of patients with scheduled outpatient clinic appointments. Cohort study with historical control. Royal Children's Hospital, Melbourne, Victoria. Patients who gave a mobile telephone contact number and were scheduled to attend an outpatient clinic at the Royal Children's Hospital, Melbourne in October, November and December 2004 (trial group) or in October, November and December 2003 (historical control group). Failure-to-attend (FTA) rate compared between the trial group, whose members were sent a reminder, and the historical control group, whose members were not sent a reminder. Financial benefits versus cost of sending reminders. 22,658 patients with a mobile telephone contact number scheduled to attend an outpatient clinic appointment in October, November and December 2004 were sent an SMS reminder; 20,448 (90.2%) of these patients attended their appointment. The control group included 22,452 patients with a mobile telephone contact number scheduled to attend an appointment, with 18,073 (80.5%) patients attending. The FTA rate was significantly lower in the trial group than in the historical control group (9.8% v 19.5%; P < 0.001). The cost of sending the SMS reminders was small compared with the increase in patient revenue and associated benefits generated as a result of improved attendance. The observed reduction in FTA rate was in line with that found using traditional reminder methods and a prior pilot study using SMS. The FTA reduction coupled with the increase in patient revenue suggests that reminding patients using SMS is a very cost effective approach for improving patient attendance.
A sustainable genetic algorithm for satellite resource allocation
NASA Technical Reports Server (NTRS)
Abbott, R. J.; Campbell, M. L.; Krenz, W. C.
1995-01-01
A hybrid genetic algorithm is used to schedule tasks for 8 satellites, which can be modelled as a robot whose task is to retrieve objects from a two dimensional field. The objective is to find a schedule that maximizes the value of objects retrieved. Typical of the real-world tasks to which this corresponds is the scheduling of ground contacts for a communications satellite. An important feature of our application is that the amount of time available for running the scheduler is not necessarily known in advance. This requires that the scheduler produce reasonably good results after a short period but that it also continue to improve its results if allowed to run for a longer period. We satisfy this requirement by developing what we call a sustainable genetic algorithm.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-20
... additional comments and information regarding the Draft SEIS scheduled for May 17, 2011, and May 19, 2011. For additional information see SUPPLEMENTARY INFORMATION. FOR FURTHER INFORMATION CONTACT: For more information on the Draft SEIS or the public meetings, you may contact Mr. Gary D. Goeke, Bureau of Ocean...
Simulation of time-control procedures for terminal area flow management
NASA Technical Reports Server (NTRS)
Alcabin, M.; Erzberger, H.; Tobias, L.; Obrien, P. J.
1985-01-01
Simulations of a terminal area traffic-management system incorporating automated scheduling and time-control (four-dimensional) techniques conducted at NASA Ames Research Center jointly with the Federal Aviation Administration, have shown that efficient procedures can be developed for handling a mix of 4D-equipped and conventionally equipped aircraft. A crucial role in this system is played by an ATC host computer algorithm, referred to as a speed advisory, that allows controllers to maintain accurate time schedules of the conventionally equipped aircraft in the traffic mix. Results are of the most recent simulations in which two important special cases were investigated. First, the effects of a speed advisory on touchdown time scheduling are examined, when unequipped aircraft are constrained to follow fuel-optimized profiles in the near-terminal area, and rescheduling procedures are developed to handle missed approaches of 4D-equipped aircraft. Various performance measures, including controller opinion, are used to evaluate the effectiveness of the procedures.
Vehicle Test Procedure Driving Schedules
DOT National Transportation Integrated Search
1977-03-01
This report discusses the salient characteristics of driving schedules which are currently being used to determine automotive fuel economy, exhaust emissions, and component characteristics. The analyses discussed and the results reported highlight th...
Bulk Leisure--Problem or Blessing?
ERIC Educational Resources Information Center
Beland, Robert M.
1983-01-01
With an increasing number of the nation's work force experiencing "bulk leisure" time because of new work scheduling procedures, parks and recreation offices are encouraged to examine their program scheduling and content. (JM)
Pigeons' Choices between Fixed-Interval and Random-Interval Schedules: Utility of Variability?
ERIC Educational Resources Information Center
Andrzejewski, Matthew E.; Cardinal, Claudia D.; Field, Douglas P.; Flannery, Barbara A.; Johnson, Michael; Bailey, Kathleen; Hineline, Philip N.
2005-01-01
Pigeons' choosing between fixed-interval and random-interval schedules of reinforcement was investigated in three experiments using a discrete-trial procedure. In all three experiments, the random-interval schedule was generated by sampling a probability distribution at an interval (and in multiples of the interval) equal to that of the…
12 CFR 404.9 - Schedule of fees.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Schedule of fees. 404.9 Section 404.9 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES INFORMATION DISCLOSURE Procedures for Disclosure of Records Under the Freedom of Information Act. § 404.9 Schedule of fees. (a) General. Ex-Im Bank shall...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-06
... Construction Permits Scheduled for March 29, 2011; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM construction permits scheduled to commence on March 29, 2011 (Auction 91). This... Telecommunications and the Media Bureaus (the Bureaus) announce an auction of certain FM Broadcast construction...
Increasing operating room efficiency through electronic medical record analysis.
Attaallah, A F; Elzamzamy, O M; Phelps, A L; Ranganthan, P; Vallejo, M C
2016-05-01
We used electronic medical record (EMR) analysis to determine errors in operating room (OR) time utilisation. Over a two year period EMR data of 44,503 surgical procedures was analysed for OR duration, on-time, first case, and add-on time performance, within 19 surgical specialties. Maximal OR time utilisation at our institution could have saved over 302,620 min or 5,044 hours of OR efficiency over a two year period. Most specialties (78.95%) had inaccurately scheduled procedure times and therefore used the OR more than their scheduled allotment time. Significant differences occurred between the mean scheduled surgical durations (101.38 ± 87.11 min) and actual durations (108.18 ± 102.27 min; P < 0.001). Significant differences also occurred between the mean scheduled add-on durations (111.4 ± 75.5 min) and the actual add-on scheduled durations (118.6 ± 90.1 minutes; P < 0.001). EMR quality improvement analysis can be used to determine scheduling error and bias, in order to improve efficiency and increase OR time utilisation.
Hubble Systems Optimize Hospital Schedules
NASA Technical Reports Server (NTRS)
2009-01-01
Don Rosenthal, a former Ames Research Center computer scientist who helped design the Hubble Space Telescope's scheduling software, co-founded Allocade Inc. of Menlo Park, California, in 2004. Allocade's OnCue software helps hospitals reclaim unused capacity and optimize constantly changing schedules for imaging procedures. After starting to use the software, one medical center soon reported noticeable improvements in efficiency, including a 12 percent increase in procedure volume, 35 percent reduction in staff overtime, and significant reductions in backlog and technician phone time. Allocade now offers versions for outpatient and inpatient magnetic resonance imaging (MRI), ultrasound, interventional radiology, nuclear medicine, Positron Emission Tomography (PET), radiography, radiography-fluoroscopy, and mammography.
Interactive experimenters' planning procedures and mission control
NASA Technical Reports Server (NTRS)
Desjardins, R. L.
1973-01-01
The computerized mission control and planning system routinely generates a 24-hour schedule in one hour of operator time by including time dimensions into experimental planning procedures. Planning is validated interactively as it is being generated segment by segment in the frame of specific event times. The planner simply points a light pen at the time mark of interest on the time line for entering specific event times into the schedule.
Effects of workload preview on task scheduling during simulated instrument flight.
Andre, A D; Heers, S T; Cashion, P A
1995-01-01
Our study examined pilot scheduling behavior in the context of simulated instrument flight. Over the course of the flight, pilots flew along specified routes while scheduling and performing several flight-related secondary tasks. The first phase of flight was flown under low-workload conditions, whereas the second phase of flight was flown under high-workload conditions in the form of increased turbulence and a disorganized instrument layout. Six pilots were randomly assigned to each of three workload preview groups. Subjects in the no-preview group were not given preview of the increased-workload conditions. Subjects in the declarative preview group were verbally informed of the nature of the flight workload manipulation but did not receive any practice under the high-workload conditions. Subjects in the procedural preview group received the same instructions as the declarative preview group but also flew half of the practice flight under the high-workload conditions. The results show that workload preview fostered efficient scheduling strategies. Specifically, those pilots with either declarative or procedural preview of future workload demands adopted an efficient strategy of scheduling more of the difficult secondary tasks during the low-workload phase of flight. However, those pilots given a procedural preview showed the greatest benefits in overall flight performance.
Guédon, Annetje C P; Paalvast, M; Meeuwsen, F C; Tax, D M J; van Dijke, A P; Wauben, L S G L; van der Elst, M; Dankelman, J; van den Dobbelsteen, J J
2016-12-01
Operating Room (OR) scheduling is crucial to allow efficient use of ORs. Currently, the predicted durations of surgical procedures are unreliable and the OR schedulers have to follow the progress of the procedures in order to update the daily planning accordingly. The OR schedulers often acquire the needed information through verbal communication with the OR staff, which causes undesired interruptions of the surgical process. The aim of this study was to develop a system that predicts in real-time the remaining procedure duration and to test this prediction system for reliability and usability in an OR. The prediction system was based on the activation pattern of one single piece of equipment, the electrosurgical device. The prediction system was tested during 21 laparoscopic cholecystectomies, in which the activation of the electrosurgical device was recorded and processed in real-time using pattern recognition methods. The remaining surgical procedure duration was estimated and the optimal timing to prepare the next patient for surgery was communicated to the OR staff. The mean absolute error was smaller for the prediction system (14 min) than for the OR staff (19 min). The OR staff doubted whether the prediction system could take all relevant factors into account but were positive about its potential to shorten waiting times for patients. The prediction system is a promising tool to automatically and objectively predict the remaining procedure duration, and thereby achieve optimal OR scheduling and streamline the patient flow from the nursing department to the OR.
Maximally Expressive Task Modeling
NASA Technical Reports Server (NTRS)
Japp, John; Davis, Elizabeth; Maxwell, Theresa G. (Technical Monitor)
2002-01-01
Planning and scheduling systems organize "tasks" into a timeline or schedule. The tasks are defined within the scheduling system in logical containers called models. The dictionary might define a model of this type as "a system of things and relations satisfying a set of rules that, when applied to the things and relations, produce certainty about the tasks that are being modeled." One challenging domain for a planning and scheduling system is the operation of on-board experiment activities for the Space Station. The equipment used in these experiments is some of the most complex hardware ever developed by mankind, the information sought by these experiments is at the cutting edge of scientific endeavor, and the procedures for executing the experiments are intricate and exacting. Scheduling is made more difficult by a scarcity of space station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling space station experiment operations calls for a "maximally expressive" modeling schema. Modeling even the simplest of activities cannot be automated; no sensor can be attached to a piece of equipment that can discern how to use that piece of equipment; no camera can quantify how to operate a piece of equipment. Modeling is a human enterprise-both an art and a science. The modeling schema should allow the models to flow from the keyboard of the user as easily as works of literature flowed from the pen of Shakespeare. The Ground Systems Department at the Marshall Space Flight Center has embarked on an effort to develop a new scheduling engine that is highlighted by a maximally expressive modeling schema. This schema, presented in this paper, is a synergy of technological advances and domain-specific innovations.
Autoshaping, random control, and omission training in the rat1
Locurto, Charles; Terrace, H. S.; Gibbon, John
1976-01-01
The role of the stimulus-reinforcer contingency in the development and maintenance of lever contact responding was studied in hooded rats. In Experiment I, three groups of experimentally naive rats were trained either on autoshaping, omission training, or a random-control procedure. Subjects trained by the autoshaping procedure responded more consistently than did either random-control or omission-trained subjects. The probability of at least one lever contact per trial was slightly higher in subjects trained by the omission procedure than by the random-control procedure. However, these differences were not maintained during extended training, nor were they evident in total lever-contact frequencies. When omission and random-control subjects were switched to the autoshaping condition, lever contacts increased in all animals, but a pronounced retardation was observed in omission subjects relative to the random-control subjects. In addition, subjects originally exposed to the random-control procedure, and later switched to autoshaping, acquired more rapidly than naive subjects that were exposed only on the autoshaping procedure. In Experiment II, subjects originally trained by an autoshaping procedure were exposed either to an omission, a random-control, or an extinction procedure. No differences were observed among the groups either in the rate at which lever contacts decreased or in the frequency of lever contacts at the end of training. These data implicate prior experience in the interpretation of omission-training effects and suggest limitations in the influence of stimulus-reinforcer relations in autoshaping. PMID:16811960
Autoshaping, random control, and omission training in the rat.
Locurto, C; Terrace, H S; Gibbon, J
1976-11-01
The role of the stimulus-reinforcer contingency in the development and maintenance of lever contact responding was studied in hooded rats. In Experiment I, three groups of experimentally naive rats were trained either on autoshaping, omission training, or a random-control procedure. Subjects trained by the autoshaping procedure responded more consistently than did either random-control or omission-trained subjects. The probability of at least one lever contact per trial was slightly higher in subjects trained by the omission procedure than by the random-control procedure. However, these differences were not maintained during extended training, nor were they evident in total lever-contact frequencies. When omission and random-control subjects were switched to the autoshaping condition, lever contacts increased in all animals, but a pronounced retardation was observed in omission subjects relative to the random-control subjects. In addition, subjects originally exposed to the random-control procedure, and later switched to autoshaping, acquired more rapidly than naive subjects that were exposed only on the autoshaping procedure. In Experiment II, subjects originally trained by an autoshaping procedure were exposed either to an omission, a random-control, or an extinction procedure. No differences were observed among the groups either in the rate at which lever contacts decreased or in the frequency of lever contacts at the end of training. These data implicate prior experience in the interpretation of omission-training effects and suggest limitations in the influence of stimulus-reinforcer relations in autoshaping.
Choice with a fixed requirement for food, and the generality of the matching relation
Stubbs, D. Alan; Dreyfus, Leon R.; Fetterman, J. Gregor; Dorman, Lana G.
1986-01-01
Pigeons were trained on choice procedures in which responses on each of two keys were reinforced probabilistically, but only after a schedule requirement had been met. Under one arrangement, a fixed-interval choice procedure was used in which responses were not reinforced until the interval was over; then a response on one key would be reinforced, with the effective key changing irregularly from interval to interval. Under a second, fixed-ratio choice procedure, responses on either key counted towards completion of the ratio and then, once the ratio had been completed, a response on the probabilistically selected key would produce food. In one experiment, the schedule requirements were varied for both fixed-interval and fixed-ratio schedules. In the second experiment, relative reinforcement rate was varied. And in a third experiment, the duration of an intertrial interval separating choices was varied. The results for 11 pigeons across all three experiments indicate that there were often large deviations between relative response rates and relative reinforcement rates. Overall performance measures were characterized by a great deal of variability across conditions. More detailed measures of choice across the schedule requirement were also quite variable across conditions. In spite of this variability, performance was consistent across conditions in its efficiency of producing food. The absence of matching of behavior allocation to reinforcement rate indicates an important difference between the present procedures and other choice procedures; that difference raises questions about the specific conditions that lead to matching as an outcome. PMID:16812452
Sankaridurg, P R; Sharma, S; Willcox, M; Sweeney, D F; Naduvilath, T J; Holden, B A; Rao, G N
1999-05-01
To report the association between colonization of contact lenses with Streptococcus pneumoniae and the observation of corneal infiltrative events in a group of patients wearing disposable hydrogel lenses on an extended-wear schedule. In a prospective clinical trial, 330 patients wore disposable hydrogels on a 6-night extended-wear and replacement schedule. The contact lens, lid, and conjunctival microbiota of these subjects was analyzed at frequent intervals and at the time of an adverse event. Streptococcus pneumoniae was an uncommon isolate and was recovered from only one of the 3,763 conjunctival samples, five (0.1%) of the 3,764 lid samples, and 33 (0.8%) of the 4,315 contact lens samples. Of the 33 lens samples, 10 (30%) were associated with corneal infiltrative events. Many of the events were mild inflammatory responses and resolved rapidly on discontinuation of lens wear. The presence of S. pneumoniae on the contact lens was associated with a significant risk of development of corneal infiltrates (odds ratio, 3.0; p = 0.0227, logistic-regression analysis). Presence of S. pneumoniae on hydrogel lenses is a significant risk factor for the development of corneal infiltrates.
Equilibrium fluid interface behavior under low- and zero-gravity conditions
NASA Technical Reports Server (NTRS)
Concus, Paul; Finn, Robert
1994-01-01
We describe here some of our recent mathematical work, which forms a basis for the Interface Configuration Experiment scheduled for USML-2. The work relates to the design of apparatus that exploits microgravity conditions for accurate determination of contact angle. The underlying motivation for the procedures rests on a discontinuous dependence of the capillary free surface interface S on the contact angle gamma, in a cylindrical capillary tube whose section (base) omega contains a protruding corner with opening angle 2 alpha. Specifically, in a gravity-free environment, omega can be chosen so that, for all sufficiently large fluid volume, the height of S is uniquely determined as a (single-valued) function mu(x,y) entirely covering the base; the height mu is bounded over omega uniformly in gamma throughout the range absolute value of (gamma -(pion/2)) less than or equal to alpha, while for absolute value of (gamma - (pion/2)) greater than alpha fluid will necessarily move to the corner and uncover the base, rising to infinity (or falling to negative infinity) at the vertex, regardless of volume. We mention here only that procedures based on the phenomenon promise excellent accuracy when gamma is close pion/2 but may be subject to experimental error when gamma is close to zero (orpion), as the 'singular' part of the domain over which the fluid accumulates (or disappears) when a critical angle gamma theta is crossed then becomes very small and may be difficult to observe. We ignore the trivial case gamma is equal to pion/2 (planar free surface), to simplify the discussion.
From Fob to Noc: A Pathway to a Cyber Career for Combat Veterans
2014-06-01
Assurance Certifications GS general schedule HSAC Homeland Security Advisory Council IDS intrusion detection system IP internet protocol IPS...NIPRNET non-secure internet protocol router network NIST National Institute for Standards and Technology NOC network operations center NSA National...twice a day on an irregular schedule or during contact with the enemy to keep any observing enemy wary of the force protection 13 condition at any
18 CFR 154.202 - Filings to initiate a new rate schedule.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Filings to initiate a new rate schedule. 154.202 Section 154.202 Conservation of Power and Water Resources FEDERAL ENERGY... Procedures for Changing Tariffs § 154.202 Filings to initiate a new rate schedule. (a) When the filing is to...
18 CFR 154.202 - Filings to initiate a new rate schedule.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Filings to initiate a new rate schedule. 154.202 Section 154.202 Conservation of Power and Water Resources FEDERAL ENERGY... Procedures for Changing Tariffs § 154.202 Filings to initiate a new rate schedule. (a) When the filing is to...
18 CFR 154.202 - Filings to initiate a new rate schedule.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Filings to initiate a new rate schedule. 154.202 Section 154.202 Conservation of Power and Water Resources FEDERAL ENERGY... Procedures for Changing Tariffs § 154.202 Filings to initiate a new rate schedule. (a) When the filing is to...
18 CFR 154.202 - Filings to initiate a new rate schedule.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Filings to initiate a new rate schedule. 154.202 Section 154.202 Conservation of Power and Water Resources FEDERAL ENERGY... Procedures for Changing Tariffs § 154.202 Filings to initiate a new rate schedule. (a) When the filing is to...
18 CFR 154.202 - Filings to initiate a new rate schedule.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Filings to initiate a new rate schedule. 154.202 Section 154.202 Conservation of Power and Water Resources FEDERAL ENERGY... Procedures for Changing Tariffs § 154.202 Filings to initiate a new rate schedule. (a) When the filing is to...
49 CFR Appendix C to Part 221 - Schedule of Civil Penalties 1
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Schedule of Civil Penalties 1 C Appendix C to Part.... 221, App. C Appendix C to Part 221—Schedule of Civil Penalties 1 Section Violation Willful violation...,000 (b), (c) improper inspection 2,500 5,000 221.16Inspection procedure: (a) Failure to obtain...
49 CFR Appendix C to Part 221 - Schedule of Civil Penalties 1
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Schedule of Civil Penalties 1 C Appendix C to Part.... 221, App. C Appendix C to Part 221—Schedule of Civil Penalties 1 Section Violation Willful violation...,000 (b), (c) improper inspection 2,500 5,000 221.16Inspection procedure: (a) Failure to obtain...
49 CFR Appendix C to Part 221 - Schedule of Civil Penalties 1
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Schedule of Civil Penalties 1 C Appendix C to Part.... 221, App. C Appendix C to Part 221—Schedule of Civil Penalties 1 Section Violation Willful violation...,000 (b), (c) improper inspection 2,500 5,000 221.16Inspection procedure: (a) Failure to obtain...
Production scheduling and rescheduling with genetic algorithms.
Bierwirth, C; Mattfeld, D C
1999-01-01
A general model for job shop scheduling is described which applies to static, dynamic and non-deterministic production environments. Next, a Genetic Algorithm is presented which solves the job shop scheduling problem. This algorithm is tested in a dynamic environment under different workload situations. Thereby, a highly efficient decoding procedure is proposed which strongly improves the quality of schedules. Finally, this technique is tested for scheduling and rescheduling in a non-deterministic environment. It is shown by experiment that conventional methods of production control are clearly outperformed at reasonable run-time costs.
76 FR 60500 - Advisory Committee on Immunization Practices (ACIP)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-29
... schedule; human papillomavirus vaccine; hepatitis B vaccine; meningococcal vaccines; influenza; 13-valent... subject to change as priorities dictate. Contact Person for More Information: Stephanie B. Thomas...
Reverey, Julia F; Fromme, Roland; Leippe, Matthias; Selhuber-Unkel, Christine
2014-08-01
To compare the potential of different soft contact lenses to be contaminated with Acanthamoeba castellanii as a function of material parameters and cleaning procedures. Different unworn soft hydrogel and silicone hydrogel contact lenses were incubated with human pathogenic A. castellanii. The adhesion of the acanthamoebae was investigated on the contact lenses and put into relation to their material parameters. The efficacy of a recommended contact lens cleaning procedure in reducing A. castellanii adhesion was investigated. We found that material parameters such as elastic modulus, silicone content, ionic properties and swelling do not influence the adhesion of acanthamoebae to soft contact lenses. A material parameter that influenced adhesion significantly was the water content of the lens. With increasing water content, the adhesion of acanthamoebae increased. By following the cleaning instructions of the manufacturer the contamination of the lenses with A. castellanii could be reduced to a minimum, as shown both on contact lenses and in control experiments. With this study we show that for the tested lenses, the adhesion of A. castellanii to contact lenses is independent of the silicone content of the lens, but depends nonlinearly on the water content of the lens. Furthermore, we demonstrate that applying proper lens cleaning procedures minimizes the risk of acanthamoebae adhesion to contact lenses. Copyright © 2013 British Contact Lens Association. Published by Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Finch, J.L.
1994-06-01
Military Specifications call out general procedures and guidelines for conducting contact resistance measurements on chemical conversion coated panels. This paper deals with a test procedure developed at Sandia National Laboratories used to conduct contact electrical resistance on non-chromated conversion coated test panels. MIL-C-81706 {open_quotes}Chemical Conversion Materials For Coating Aluminum and Aluminum Alloys{close_quotes} was the reference specification used for guidance.
Contact stresses in meshing spur gear teeth: Use of an incremental finite element procedure
NASA Technical Reports Server (NTRS)
Hsieh, Chih-Ming; Huston, Ronald L.; Oswald, Fred B.
1992-01-01
Contact stresses in meshing spur gear teeth are examined. The analysis is based upon an incremental finite element procedure that simultaneously determines the stresses in the contact region between the meshing teeth. The teeth themselves are modeled by two dimensional plain strain elements. Friction effects are included, with the friction forces assumed to obey Coulomb's law. The analysis assumes that the displacements are small and that the tooth materials are linearly elastic. The analysis procedure is validated by comparing its results with those for the classical two contacting semicylinders obtained from the Hertz method. Agreement is excellent.
NASA Astrophysics Data System (ADS)
Ramli, Razamin; Tein, Lim Huai
2016-08-01
A good work schedule can improve hospital operations by providing better coverage with appropriate staffing levels in managing nurse personnel. Hence, constructing the best nurse work schedule is the appropriate effort. In doing so, an improved selection operator in the Evolutionary Algorithm (EA) strategy for a nurse scheduling problem (NSP) is proposed. The smart and efficient scheduling procedures were considered. Computation of the performance of each potential solution or schedule was done through fitness evaluation. The best so far solution was obtained via special Maximax&Maximin (MM) parent selection operator embedded in the EA, which fulfilled all constraints considered in the NSP.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
... Effectiveness of Proposed Rule Change To Modify Its Fee Schedule December 20, 2013. Pursuant to Section 19(b)(1... Rules & Procedures (``Rules'') of NSCC to modify its fee schedule, as more fully described below. II... The purpose of the proposed rule change is to revise NSCC's fee schedule (as listed in Addendum A of...
Scheduling for anesthesia at geographic locations remote from the operating room.
Dexter, Franklin; Wachtel, Ruth E
2014-08-01
Providing general anesthesia at locations away from the operating room, called remote locations, poses many medical and scheduling challenges. This review discusses how to schedule procedures at remote locations to maximize anesthesia productivity (see Video, Supplemental Digital Content 1). Anesthesia labour productivity can be maximized by assigning one or more 8-h or 10-h periods of allocated time every 2 weeks dedicated specifically to each remote specialty that has enough cases to fill those periods. Remote specialties can then schedule their cases themselves into their own allocated time. Periods of allocated time (called open, unblocked or first come first served time) can be used by remote locations that do not have their own allocated time. Unless cases are scheduled sequentially into allocated time, there will be substantial extra underutilized time (time during which procedures are not being performed and personnel sit idle even though staffing has been planned) and a concomitant reduction in percent productivity. Allocated time should be calculated on the basis of usage. Remote locations with sufficient hours of cases should be allocated time reserved especially for them in which to schedule their cases, with a maximum waiting time of 2 weeks, to achieve an average wait of 1 week.
76 FR 18809 - Sunshine Federal Register Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-05
... 9 a.m. Information Briefing on Emergency Preparedness (Public Meeting). (Contact: Robert Kahler, 301... on Emergency Preparedness previously scheduled on May 12, 2011, has been rescheduled on May 3, 2011...
An automated device for appetitive conditioning in zebrafish (Danio rerio).
Manabe, Kazuchika; Dooling, R J; Takaku, Shinichi
2013-12-01
An automated device and a procedure for the operant conditioning individual zebrafish were developed. The key feature of this procedure was the construction of a simple, inexpensive feeder that can deliver extremely small amounts of food, thus preventing rapid satiation. This allows the experimenter to run multiple trails in a single test session and multiple sessions in one day. In addition, small response keys made from acryl rods and fiber sensors were developed that were sufficiently sensitive to detect fish contact. To illustrate the efficiency and utility of the device for traditional learning paradigms, we trained zebrafish in a fixed ratio schedule where subjects were reinforced with food after 10 responses. Zebrafish reliably responded on the response key for sessions that lasted as long 80-reinforcements. They also showed the traditional "break and run" response pattern that has been found in many species. These results show that this system will be valuable for behavioral studies with zebrafish, especially for experiments that need many repeated trials using food reinforcer in a session. The present system can be used for sensory and learning investigations, as well applications in behavioral pharmacology, behavioral genetics, and toxicology where the zebrafish is becoming the vertebrate model of choice.
1989-12-01
to construct because the mechanism is a dispatching procedure. Since all nonpreemptive schedules are contained in the set of all preemptive schedules...the optimal value of T’.. in the preemptive case is at least a lower bound on the optimal T., for the nonpreemptive schedules. This principle is the...adapt to changes in the enviro.nment. In hard real-time systems, tasks are also distinguished as preemptable and nonpreemptable . A task is preemptable
2015-06-01
CP AP because of claustrophobia, noise, nose bleeds, dermatitis and nasal bridge sores. In many cases, these effects are due to incorrect pressure...checked for contact data in case a subject must be contacted due to scheduling problems, or some new information is learned that a subject needs to know...Subject initiated contacts via phone or email to the PI with respect to adverse events, side effects or questions will be recorded on an electronic log
Results of Rolling Resistance Measurements of Twelve Radial Passenger Car Tires
DOT National Transportation Integrated Search
1980-01-01
The Calspan Tire Research Facility is described, including the test procedure, a tire test schedule, and a tire identification schedule for testing low-rolling resistance radial passenger car tires. The equilibrium rolling resistance was measured on ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... Resolution Procedures for Protests and Contact Disputes AGENCY: Federal Aviation Administration (FAA), DOT... CONTACT: Carla Scott on (202) 385-4293, or by e-mail at: [email protected] . SUPPLEMENTARY INFORMATION: OMB Control Number: 2120-0632. Title: Office of Dispute Resolution Procedures for Protests and Contact...
Code of Federal Regulations, 2010 CFR
2010-01-01
... (CONTINUED) SALES REGULATION PROCEDURES FOR ACQUISITION OF PETROLEUM FOR THE STRATEGIC PETROLEUM RESERVE § 626.1 Purpose. This part establishes the procedures for acquiring petroleum for, and deferring contractually scheduled deliveries to, the Strategic Petroleum Reserve. The procedures do not represent actual...
Code of Federal Regulations, 2011 CFR
2011-01-01
... (CONTINUED) SALES REGULATION PROCEDURES FOR ACQUISITION OF PETROLEUM FOR THE STRATEGIC PETROLEUM RESERVE § 626.1 Purpose. This part establishes the procedures for acquiring petroleum for, and deferring contractually scheduled deliveries to, the Strategic Petroleum Reserve. The procedures do not represent actual...
Small Systems Monthly Webinar Series
Schedule for EPA's Office of Research and Development and Office of Water's monthly webinar series: challenges and treatment solutions for small drinking water systems. One continuing education contact hour is offered for each webinar.
76 FR 63957 - National Science Board; Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
... Science and Engineering Laboratory and Giant Segmented Mirrored Telescope, and Other Committee Business... Science Board Web site ( http://www.nsf.gov/nsb/notices/ ) for information or schedule updates, or contact...
7 CFR 275.5 - Scope and purpose.
Code of Federal Regulations, 2013 CFR
2013-01-01
... migrations. This requirement may be satisfied by either scheduling ME reviews to coincide with such migrations or by conducting special reviews. As part of the review the State agency shall contact local...
7 CFR 275.5 - Scope and purpose.
Code of Federal Regulations, 2012 CFR
2012-01-01
... migrations. This requirement may be satisfied by either scheduling ME reviews to coincide with such migrations or by conducting special reviews. As part of the review the State agency shall contact local...
7 CFR 275.5 - Scope and purpose.
Code of Federal Regulations, 2014 CFR
2014-01-01
... migrations. This requirement may be satisfied by either scheduling ME reviews to coincide with such migrations or by conducting special reviews. As part of the review the State agency shall contact local...
77 FR 39528 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-03
.... Briefing on the Status of Lessons Learned from the Fukushima, Dai-Ichi Accident (Public Meeting), (Contact...- 1651. * * * * * The NRC Commission Meeting Schedule can be found on the Internet at: http://www.nrc.gov...
DUF6 Conversion Facility EIS Schedule
and Uses DUF6 Conversion EIS Documents News FAQs Internet Resources Glossary Home » Conversion News | FAQs | Internet Resources | Glossary Help | Mailing Services | Contact Us | About Us | Security
7 CFR 275.5 - Scope and purpose.
Code of Federal Regulations, 2011 CFR
2011-01-01
... migrations. This requirement may be satisfied by either scheduling ME reviews to coincide with such migrations or by conducting special reviews. As part of the review the State agency shall contact local...
Estimating the cost of major ongoing cost plus hardware development programs
NASA Technical Reports Server (NTRS)
Bush, J. C.
1990-01-01
Approaches are developed for forecasting the cost of major hardware development programs while these programs are in the design and development C/D phase. Three approaches are developed: a schedule assessment technique for bottom-line summary cost estimation, a detailed cost estimation approach, and an intermediate cost element analysis procedure. The schedule assessment technique was developed using historical cost/schedule performance data.
ERIC Educational Resources Information Center
Allan, Blaine W., Comp.
The procedures, forms, and philosophy of the computerized modular scheduling program developed at Virgin Valley High School are outlined. The modular concept is eveloped as a new approach to course structure with explanations, examples, and worksheets included. Examples of courses of study, input information for the data processing center, output…
Allergic manifestations of contact lens wearing.
Solomon, Abraham
2016-10-01
Contact lens-induced papillary conjunctivitis (CLPC) is a common ocular allergic disease in contact lens wearers. In its more severe form, it can cause giant papillary conjunctivitis, resulting in contact lens intolerance and the need to discontinue the use of contact lenses. This review presents the pathogenesis, clinical manifestations and management guidelines of this common disorder. Different types of contact lenses are associated with differences in the severity of CLPC. Refitting patients with silicone hydrogel contact lenses or with daily disposable contact lenses may improve the signs and symptoms of CLPC. The recent introduction of the topical immunomodulatory agent tacrolimus in other severe allergic eye diseases may apply in suppressing the allergic inflammation in CLPC as well. CLPC is a common ocular disorder in contact lens wearers, with a significant impact on the quality of vision. It should be promptly recognized by healthcare practitioners and managed by modifications of the types and wearing schedules of contact lenses, as well as novel treatment options with topical immunomodulators.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-05
... identity or contact information unless you provide it in the body of your comment. If you send an e-mail... and other contact information in the body of your comment and with any disk or CD-ROM you submit. If..., OMB Control No. 2060-0528. ICR Status: This ICR is currently scheduled to expire on March 31, 2011. An...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-11
... CONTACT: Ms. Dana Munson, Procurement Analyst, General Services Acquisition Policy Division, GSA, at...) requires contractors submitting Multiple Award Schedule Contracts to identify in their GSA price lists...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-17
.... See SUPPLEMENTARY INFORMATION for further details. FOR FURTHER INFORMATION CONTACT: Richard A. Pearson of the Highly Migratory Species Management Division at (727) 824-5399. SUPPLEMENTARY INFORMATION...
Controls for and constraints on auto-shaping
Bilbrey, John; Winokur, Stephen
1973-01-01
Auto-shaping the pigeon's key-peck response was examined as a respondent conditioning procedure with the use of Rescorla's truly-random control procedure. In the first experiment, pigeons received presentations of brief light on the response key and brief presentations of food where the light and the food were independently presented. All birds failed to key peck after many light and food presentations, but explicit pairing of the light and food rapidly conditioned pecking to the light. Experiment 2 showed that even when an independent light/food presentation schedule was reduced to variable-time 30 sec, additional naive birds would not key peck and only one bird pecked when the schedules were variable-time 15 sec. A third experiment examined an explicit-unpairing control procedure, where the light and food were not only presented on independent schedules but were also separated by a minimum time, and found that auto-shaping did not occur. A fourth experiment investigated a number of control procedures and found them ineffective. A fifth experiment investigated the effects of a physical separation of the locus of the response key and the food dispenser, and a sixth experiment investigated using a tone in place of the light. It was concluded that pecking is generated by auto-shaping procedures only when an intermittently presented keylight is regularly paired with food. PMID:16811710
Constraint-based integration of planning and scheduling for space-based observatory management
NASA Technical Reports Server (NTRS)
Muscettola, Nicola; Smith, Steven F.
1994-01-01
Progress toward the development of effective, practical solutions to space-based observatory scheduling problems within the HSTS scheduling framework is reported. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) short-term observation scheduling problem. The work was motivated by the limitations of the current solution and, more generally, by the insufficiency of classical planning and scheduling approaches in this problem context. HSTS has subsequently been used to develop improved heuristic solution techniques in related scheduling domains and is currently being applied to develop a scheduling tool for the upcoming Submillimeter Wave Astronomy Satellite (SWAS) mission. The salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research are summarized. Then, some key problem decomposition techniques underlying the integrated planning and scheduling approach to the HST problem are described; research results indicate that these techniques provide leverage in solving space-based observatory scheduling problems. Finally, more recently developed constraint-posting scheduling procedures and the current SWAS application focus are summarized.
NASA Technical Reports Server (NTRS)
Martelli, Andrea
1994-01-01
This paper presents the capabilities implemented in the SAX system for an efficient operations management during its in-flight mission. SAX is an Italian scientific satellite for x-ray astronomy whose major mission objectives impose quite tight constraints on the implementation of both the space and ground segment. The most relevant mission characteristics require an operative lifetime of two years, performing scientific observations both in contact and in noncontact periods, with a low equatorial orbit supported by one ground station, so that only a few minutes of communications are available each orbit. This operational scenario determines the need to have a satellite capable of performing the scheduled mission automatically and reacting autonomously to contingency situations. The implementation approach of the on-board operations management, through which the necessary automation and autonomy are achieved, follows a hierarchical structure. This has been achieved adopting a distributed avionic architecture. Nine different on-board computers, in fact, constitute the on-board data management system. Each of them performs the local control and monitors its own functions while the system level control is performed at a higher level by the data handling applications software. The SAX on-board architecture provides the ground operators with different options of intervention by three classes of telecommands. The management of the scientific operations will be scheduled by the operation control center via dedicated operating plans. The SAX satellite flight mode is presently being integrated at Alenia Spazio premises in Turin for a launch scheduled for the end of 1995. Once in orbit, the SAX satellite will be subject to intensive check-out activities in order to verify the required mission performances. An overview of the envisaged procedure and of the necessary on-ground activities is therefore depicted as well.
Procedure for pressure contact on high-power semiconductor devices free of thermal fatigue
NASA Technical Reports Server (NTRS)
Knobloch, J.
1979-01-01
To eliminate thermal fatigue, a procedure for manufacturing semiconductor power devices with pure pressure contact without solid binding was developed. Pressure contact without the use of a solid binding to avoid a limitation of the maximum surface in the contact was examined. A silicon wafer covered with a relatively thick metal layer is imbedded with the aid of a soft silver foil between two identically sized hard contact discs (molybdenum or tungsten) which are rotationally symmetrical. The advantages of this concept are shown for large diameters. The pressure contact was tested successfully in many devices in a large variety of applications.
21 CFR 113.83 - Establishing scheduled processes.
Code of Federal Regulations, 2011 CFR
2011-04-01
... procedures recognized by competent processing authorities. If incubation tests are necessary for process... the period of instituting the process. The incubation tests for confirmation of the scheduled... and associated incubation tests shall be prepared and shall be permanently retained by the person or...
24 CFR 982.517 - Utility allowance schedule.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., the PHA also must provide any information or procedures used in preparation of the schedule. (b) How... services according to the following general categories: space heating; air conditioning; cooking; water heating; water; sewer; trash collection (disposal of waste and refuse); other electric; refrigerator (cost...
40 CFR 155.44 - Establish schedules for registration review.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Establish schedules for registration review. 155.44 Section 155.44 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.44...
Surgeon and type of anesthesia predict variability in surgical procedure times.
Strum, D P; Sampson, A R; May, J H; Vargas, L G
2000-05-01
Variability in surgical procedure times increases the cost of healthcare delivery by increasing both the underutilization and overutilization of expensive surgical resources. To reduce variability in surgical procedure times, we must identify and study its sources. Our data set consisted of all surgeries performed over a 7-yr period at a large teaching hospital, resulting in 46,322 surgical cases. To study factors associated with variability in surgical procedure times, data mining techniques were used to segment and focus the data so that the analyses would be both technically and intellectually feasible. The data were subdivided into 40 representative segments of manageable size and variability based on headers adopted from the common procedural terminology classification. Each data segment was then analyzed using a main-effects linear model to identify and quantify specific sources of variability in surgical procedure times. The single most important source of variability in surgical procedure times was surgeon effect. Type of anesthesia, age, gender, and American Society of Anesthesiologists risk class were additional sources of variability. Intrinsic case-specific variability, unexplained by any of the preceding factors, was found to be highest for shorter surgeries relative to longer procedures. Variability in procedure times among surgeons was a multiplicative function (proportionate to time) of surgical time and total procedure time, such that as procedure times increased, variability in surgeons' surgical time increased proportionately. Surgeon-specific variability should be considered when building scheduling heuristics for longer surgeries. Results concerning variability in surgical procedure times due to factors such as type of anesthesia, age, gender, and American Society of Anesthesiologists risk class may be extrapolated to scheduling in other institutions, although specifics on individual surgeons may not. This research identifies factors associated with variability in surgical procedure times, knowledge of which may ultimately be used to improve surgical scheduling and operating room utilization.
Tracing contacts of TB patients in Malaysia: costs and practicality.
Atif, Muhammad; Sulaiman, Syed Azhar Syed; Shafie, Asrul Akmal; Ali, Irfhan; Asif, Muhammad
2012-01-01
Tuberculin skin testing (TST) and chest X-ray are the conventional methods used for tracing suspected tuberculosis (TB) patients. The purpose of the study was to calculate the cost incurred by Penang General Hospital on performing one contact tracing procedure using an activity based costing approach. Contact tracing records (including the demographic profile of contacts and outcome of the contact tracing procedure) from March 2010 until February 2011 were retrospectively obtained from the TB contact tracing record book. The human resource cost was calculated by multiplying the mean time spent (in minutes) by employees doing a specific activity by their per-minute salaries. The costs of consumables, Purified Protein Derivative vials and clinical equipment were obtained from the procurement section of the Pharmacy and Radiology Departments. The cost of the building was calculated by multiplying the area of space used by the facility with the unit cost of the public building department. Straight-line deprecation with a discount rate of 3% was assumed for the calculation of equivalent annual costs for the building and machines. Out of 1024 contact tracing procedures, TST was positive (≥10 mm) in 38 suspects. However, chemoprophylaxis was started in none. Yield of contact tracing (active tuberculosis) was as low as 0.5%. The total unit cost of chest X-ray and TST was MYR 9.23 (2.90 USD) & MYR 11.80 (USD 3.70), respectively. The total cost incurred on a single contact tracing procedure was MYR 21.03 (USD 6.60). Our findings suggest that the yield of contact tracing was very low which may be attributed to an inappropriate prioritization process. TST may be replaced with more accurate and specific methods (interferon gamma release assay) in highly prioritized contacts; or TST-positive contacts should be administered 6H therapy (provided that the chest radiography excludes TB) in accordance with standard protocols. The unit cost of contact tracing can be significantly reduced if radiological examination is done only in TST or IRGA positive contacts.
A Systems Approach to Military Construction.
1982-11-01
Unclassi fled I150. OECL ASSI F1C ATI ON/ DOWNGRADING I SCHEDULE IS. DISYR1EUTION STATEMENT (ot this Repo"t) Approved for public release; distribution...30 Procurement Alternatives 30 Design Alternatives 33 Preconcept Control Data 34 AE Selection Procedure 36 Scheduling 40 Cost Estimating 44 4...data, scheduling , and cost estimating. The objectives of project coordination for a systems-oriented project do not differ from those of a
Factors associated with attendance to scheduled outpatient endoscopy
Laiyemo, Adeyinka O.; Williams, Carla D.; Burnside, Clinton; Moghadam, Sepideh; Sanasi-Bhola, Kamla D.; Kwagyan, John; Brim, Hassan; Ashktorab, Hassan; Scott, Victor F.; Smoot, Duane T.
2015-01-01
Background Non-attendance of 42% has been reported for outpatient colonoscopy among persons with low socioeconomic status (SES) in an open access system in the United States. Objectives To evaluate attendance to outpatient endoscopy among populations with low SES after in-person consultations with endoscopists prior to scheduling. Methods Retrospectively, we reviewed the endoscopy schedule from September 2009 to August 2010 in an inner city teaching hospital in Washington DC. We identified patients who came for their procedures. We defined non-attendance as when patients did not notify the facility up to 24 hours prior to their scheduled procedures and did not show up . Results A total of 3,304 patients were scheduled for outpatient endoscopy (mean age 55.2 years; 59.5% females). Only 36 (1.1%) patients were uninsured. 716 (21.7%) patients did not show up for their procedures. There were no differences in attendance by age, sex and race. Patients seen in a private endoscopist's office (OR=1.47; 95%CI: 1.07–2.04) were more likely to attend when compared to patients seen in trainees’ continuity clinic. Married patients (OR=1.40; 95%CI: 1.11–1.78) were also more likely to attend. Conversely, Medicaid and uninsured patients were less likely to attend. Restricting our analysis to patients scheduled for only colonoscopy yielded similar results except that patients who were 50 years and older were more likely to attend. Conclusions Our study suggests improved attendance to endoscopy when populations with lower SES undergo prior consultation with an endoscopist. There is a potential to further improve attendance to out-patient endoscopy by directly involving the social support of the patients. PMID:25180285
Factors associated with attendance to scheduled outpatient endoscopy.
Laiyemo, Adeyinka O; Williams, Carla D; Burnside, Clinton; Moghadam, Sepideh; Sanasi-Bhola, Kamla D; Kwagyan, John; Brim, Hassan; Ashktorab, Hassan; Scott, Victor F; Smoot, Duane T
2014-10-01
Non-attendance of 42% has been reported for outpatient colonoscopy among persons with low socioeconomic status (SES) in an open access system in the USA. To evaluate attendance to outpatient endoscopy among populations with low SES after inperson consultations with endoscopists prior to scheduling. Retrospectively, we reviewed the endoscopy schedule from September 2009 to August 2010 in an inner city teaching hospital in Washington, DC. We identified patients who came for their procedures. We defined non-attendance as when patients did not notify the facility up to 24 h prior to their scheduled procedures and did not show up. A total of 3304 patients were scheduled for outpatient endoscopy (mean age 55.2 years; 59.5% women). Only 36 (1.1%) patients were uninsured. 716 (21.7%) patients did not show up for their procedures. There were no differences in attendance by age, sex and race. Patients seen in a private endoscopist's office (OR=1.47; 95% CI 1.07 to 2.04) were more likely to attend when compared with patients seen in trainees' continuity clinic. Married patients (OR=1.40; 95% CI 1.11 to 1.78) were also more likely to attend. Conversely, Medicaid and uninsured patients were less likely to attend. Restricting our analysis to patients scheduled for only colonoscopy yielded similar results except that patients aged 50 years and older were more likely to attend. Our study suggests improved attendance to endoscopy when populations with lower SES undergo prior consultation with an endoscopist. There is a potential to further improve attendance to outpatient endoscopy by directly involving the social support of the patients. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
Stepaniak, Pieter S; Vrijland, Wietske W; de Quelerij, Marcel; de Vries, Guus; Heij, Christiaan
2010-12-01
If variation in procedure times could be controlled or better predicted, the cost of surgeries could be reduced through improved scheduling of surgical resources. This study on the impact of similar consecutive cases on the turnover, surgical, and procedure times tests the perception that repeating the same manual tasks reduces the duration of these tasks. We hypothesize that when a fixed team works on similar consecutive cases the result will be shorter turnover and procedure duration as well as less variation as compared with the situation without a fixed team. Case-control study. St Franciscus Hospital, a large general teaching hospital in Rotterdam, the Netherlands. Two procedures, inguinal hernia repair and laparoscopic cholecystectomy, were selected and divided across a control group and a study group. Patients were randomly assigned to the study or control group. Preparation time, surgical time, procedure time, and turnover time. For inguinal hernia repair, we found a significantly lower preparation time and 10 minutes less procedure time in the study group, as compared with the control group. Variation in the study group was lower, as compared with the control group. For laparoscopic cholecystectomy, preparation time was significantly lower in the study group, as compared with the control group. For both procedures, there was a significant decrease in turnover time. Scheduling similar consecutive cases and performing with a fixed team results in lower turnover times and preparation times. The procedure time of the inguinal hernia repair decreased significantly and has practical scheduling implications. For more complex surgery, like laparoscopic cholecystectomy, there is no effect on procedure time.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biebesheimer, E.
This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Corrective Actions/Compliance Schedule Approval Report for the subject facility, contains the corrective actions required to bring the facility into compliance as a result of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. These actions are delineated in the Compliance Schedule Approvals which also contain; noncompliances, risks, compensatory measures, schedules for corrective actions, justifications for approval, and resource impacts.
Application of decentralized cooperative problem solving in dynamic flexible scheduling
NASA Astrophysics Data System (ADS)
Guan, Zai-Lin; Lei, Ming; Wu, Bo; Wu, Ya; Yang, Shuzi
1995-08-01
The object of this study is to discuss an intelligent solution to the problem of task-allocation in shop floor scheduling. For this purpose, the technique of distributed artificial intelligence (DAI) is applied. Intelligent agents (IAs) are used to realize decentralized cooperation, and negotiation is realized by using message passing based on the contract net model. Multiple agents, such as manager agents, workcell agents, and workstation agents, make game-like decisions based on multiple criteria evaluations. This procedure of decentralized cooperative problem solving makes local scheduling possible. And by integrating such multiple local schedules, dynamic flexible scheduling for the whole shop floor production can be realized.
A comparison of multiprocessor scheduling methods for iterative data flow architectures
NASA Technical Reports Server (NTRS)
Storch, Matthew
1993-01-01
A comparative study is made between the Algorithm to Architecture Mapping Model (ATAMM) and three other related multiprocessing models from the published literature. The primary focus of all four models is the non-preemptive scheduling of large-grain iterative data flow graphs as required in real-time systems, control applications, signal processing, and pipelined computations. Important characteristics of the models such as injection control, dynamic assignment, multiple node instantiations, static optimum unfolding, range-chart guided scheduling, and mathematical optimization are identified. The models from the literature are compared with the ATAMM for performance, scheduling methods, memory requirements, and complexity of scheduling and design procedures.
Air Traffic Management Technology Demostration: 1 Research and Procedural Testing of Routes
NASA Technical Reports Server (NTRS)
Wilson, Sara R.; Kibler, Jennifer L.; Hubbs, Clay E.; Smail, James W.
2015-01-01
NASA's Air Traffic Management Technology Demonstration-1 (ATD-1) will operationally demonstrate the feasibility of efficient arrival operations combining ground-based and airborne NASA technologies. The ATD-1 integrated system consists of the Traffic Management Advisor with Terminal Metering which generates precise time-based schedules to the runway and merge points; Controller Managed Spacing decision support tools which provide controllers with speed advisories and other information needed to meet the schedule; and Flight deck-based Interval Management avionics and procedures which allow flight crews to adjust their speed to achieve precise relative spacing. Initial studies identified air-ground challenges related to the integration of these three scheduling and spacing technologies, and NASA's airborne spacing algorithm was modified to address some of these challenges. The Research and Procedural Testing of Routes human-in-the-loop experiment was then conducted to assess the performance of the new spacing algorithm. The results of this experiment indicate that the algorithm performed as designed, and the pilot participants found the airborne spacing concept, air-ground procedures, and crew interface to be acceptable. However, the researchers concluded that the data revealed issues with the frequency of speed changes and speed reversals.
49 CFR 572.176 - Knees and knee impact test procedure.
Code of Federal Regulations, 2012 CFR
2012-10-01
... procedure in subsection (c) of this section: (1) The peak resistance force as measured with the test probe.... (3) Align the test probe so that throughout its stroke and at contact with the knee it is within 2... contact between the impactor and the knee. (5) The test probe velocity at the time of contact shall be 2.1...
49 CFR 572.176 - Knees and knee impact test procedure.
Code of Federal Regulations, 2014 CFR
2014-10-01
... procedure in subsection (c) of this section: (1) The peak resistance force as measured with the test probe.... (3) Align the test probe so that throughout its stroke and at contact with the knee it is within 2... contact between the impactor and the knee. (5) The test probe velocity at the time of contact shall be 2.1...
49 CFR 572.176 - Knees and knee impact test procedure.
Code of Federal Regulations, 2013 CFR
2013-10-01
... procedure in subsection (c) of this section: (1) The peak resistance force as measured with the test probe.... (3) Align the test probe so that throughout its stroke and at contact with the knee it is within 2... contact between the impactor and the knee. (5) The test probe velocity at the time of contact shall be 2.1...
... tell you that you should not wear contact lenses during your treatment with difluprednate eye drops.you should know that difluprednate eye drops ... your regular dosing schedule. Do not apply extra eye drops to make up for a missed dose.
78 FR 25739 - Combined Notice of Filings
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-02
...: Transcontinental Gas Pipe Line Company. Description: Annual Adjustment to Rate Schedule SS-2 Storage Gas Balances.... Description: Removal of Non Conforming and Neg Rate TSAs and Points of Contact Update Filing to be effective 5...
Can Internet information on vertebroplasty be a reliable means of patient self-education?
Sullivan, T Barrett; Anderson, Joshua T; Ahn, Uri M; Ahn, Nicholas U
2014-05-01
Studies of the quality and accuracy of health and medical information available on the Internet have shown that many sources provide inadequate information. However, to our knowledge, there are no published studies analyzing the quality of information available online regarding vertebroplasty. Because this has been a high-volume procedure with highly debated efficacy, it is critical that patients receive complete, accurate, and well-balanced information before deciding a treatment course. Additionally, few studies have evaluated the merit of academic site authorship or site certification on information quality, but some studies have used measurements of quality that are based primarily on subjective criteria or information accuracy rather than information completeness. The purposes of our study were (1) to evaluate and analyze the information on vertebroplasty available to the general public through the Internet; (2) to see if sites sponsored by academic institutions offered a higher quality of information; and (3) to determine whether quality of information varied according to site approval by a certification body. Three search engines were used to identify 105 web sites (35 per engine) offering information regarding vertebroplasty. Sites were evaluated for authorship/sponsorship, content, and references cited. Information quality was rated as "excellent," "high," "moderate," "low," or "unacceptable." Sites also were evaluated for contact information to set up an appointment. Data were analyzed as a complete set, then compared between authorship types, and finally evaluated by certification status. Academic sites were compared with other authorship groups and certified sites were compared with noncertified sites using Student's t-test. Appropriate indications were referenced in 74% of sites, whereas only 45% discussed a contraindication to the procedure. Benefits were expressed by 100% of sites, but risks were outlined in only 53% (p < 0.001). Ninety-nine percent of sites provided step-by-step descriptions of the procedure, and 44% of sites also included images. Alternative treatments were mentioned by 51% of sites. Twenty-seven percent of sites referenced peer-reviewed literature, 41% offered experiential or noncited data based on American populations, and 7% offered analogous data from international populations. Thirty percent of sites provided contact information for patient appointment scheduling. Seven percent of sites were classified as excellent quality, 6% as high quality, 11% as moderate quality, 19% as poor quality, and 57% as unacceptable. Sixteen percent of sites were sponsored by academic institutions, 62% by private groups, 8% by biomedical device companies, and 14% were sponsored otherwise. Academic sites reported fewer risks of the procedure than private sites or other sites (p = 0.05 and p = 0.04), but reported more risks than industry sites (p = 0.007). Academic sites were more likely than sites classified as other to offer contact information for patient appointment scheduling (p = 0.004). Nine percent of sites evaluated were Health on the Net Foundation (HONCode) certified. No association with improved information quality was observed in these sites relative to noncertified sites (all p > 0.05). Internet information regarding vertebroplasty is not only inadequate for proper patient education, but also potentially misleading as sites are more likely to present benefits of the procedure than risks. Although academic sites might be expected to offer higher-quality information than private, industry, or other sites, our data would suggest that they do not. HONCode certification cannot be used reliably as a means of qualifying website information quality. Academic sites should be expected to set a high standard and alter their Internet presence with adequate information distribution. Certification bodies also should alter their standards to necessitate provision of complete information in addition to emphasizing accurate information. Treating physicians may want to counsel their patients regarding the limitations of information present on the Internet and the pitfalls of current certification systems. Level IV, economic and decision analyses. See the Instructions for Authors for a complete description of levels of evidence.
29 CFR 1603.201 - Referral and scheduling for hearing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 4 2010-07-01 2010-07-01 false Referral and scheduling for hearing. 1603.201 Section 1603.201 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES FOR PREVIOUSLY EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION...
29 CFR 1603.201 - Referral and scheduling for hearing.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 4 2012-07-01 2012-07-01 false Referral and scheduling for hearing. 1603.201 Section 1603.201 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES FOR PREVIOUSLY EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION...
29 CFR 1603.201 - Referral and scheduling for hearing.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 4 2011-07-01 2011-07-01 false Referral and scheduling for hearing. 1603.201 Section 1603.201 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES FOR PREVIOUSLY EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION...
29 CFR 1603.201 - Referral and scheduling for hearing.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 4 2014-07-01 2014-07-01 false Referral and scheduling for hearing. 1603.201 Section 1603.201 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES FOR PREVIOUSLY EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION...
29 CFR 1603.201 - Referral and scheduling for hearing.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 4 2013-07-01 2013-07-01 false Referral and scheduling for hearing. 1603.201 Section 1603.201 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES FOR PREVIOUSLY EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION...
45 CFR 1801.52 - Payment schedule.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the Foundation...
45 CFR 1801.52 - Payment schedule.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the Foundation...
45 CFR 1801.52 - Payment schedule.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the Foundation...
45 CFR 1801.52 - Payment schedule.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the Foundation...
45 CFR 1801.52 - Payment schedule.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the Foundation...
State Regulation of Heliport Design
2001-05-01
Arpt Lgt Sked: Dusk-Dawn 81. Schedule for beacon; if lights on different from beacon list as a remark. If no beacon list light schedule. 82. Unicorn ...continued importance of hospital heliports and the rapidly growing use of instrument approach/departure procedures at such sites, is it appropriate
A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes.
Lee, I; Sikora, R; Shaw, M J
1997-01-01
Genetic algorithms (GAs) have been used widely for such combinatorial optimization problems as the traveling salesman problem (TSP), the quadratic assignment problem (QAP), and job shop scheduling. In all of these problems there is usually a well defined representation which GA's use to solve the problem. We present a novel approach for solving two related problems-lot sizing and sequencing-concurrently using GAs. The essence of our approach lies in the concept of using a unified representation for the information about both the lot sizes and the sequence and enabling GAs to evolve the chromosome by replacing primitive genes with good building blocks. In addition, a simulated annealing procedure is incorporated to further improve the performance. We evaluate the performance of applying the above approach to flexible flow line scheduling with variable lot sizes for an actual manufacturing facility, comparing it to such alternative approaches as pair wise exchange improvement, tabu search, and simulated annealing procedures. The results show the efficacy of this approach for flexible flow line scheduling.
Hidri, Lotfi; Gharbi, Anis; Louly, Mohamed Aly
2014-01-01
We focus on the two-center hybrid flow shop scheduling problem with identical parallel machines and removal times. The job removal time is the required duration to remove it from a machine after its processing. The objective is to minimize the maximum completion time (makespan). A heuristic and a lower bound are proposed for this NP-Hard problem. These procedures are based on the optimal solution of the parallel machine scheduling problem with release dates and delivery times. The heuristic is composed of two phases. The first one is a constructive phase in which an initial feasible solution is provided, while the second phase is an improvement one. Intensive computational experiments have been conducted to confirm the good performance of the proposed procedures.
Efficient Bounding Schemes for the Two-Center Hybrid Flow Shop Scheduling Problem with Removal Times
2014-01-01
We focus on the two-center hybrid flow shop scheduling problem with identical parallel machines and removal times. The job removal time is the required duration to remove it from a machine after its processing. The objective is to minimize the maximum completion time (makespan). A heuristic and a lower bound are proposed for this NP-Hard problem. These procedures are based on the optimal solution of the parallel machine scheduling problem with release dates and delivery times. The heuristic is composed of two phases. The first one is a constructive phase in which an initial feasible solution is provided, while the second phase is an improvement one. Intensive computational experiments have been conducted to confirm the good performance of the proposed procedures. PMID:25610911
Space network scheduling benchmark: A proof-of-concept process for technology transfer
NASA Technical Reports Server (NTRS)
Moe, Karen; Happell, Nadine; Hayden, B. J.; Barclay, Cathy
1993-01-01
This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.
Resource Allocation in a Repetitive Project Scheduling Using Genetic Algorithm
NASA Astrophysics Data System (ADS)
Samuel, Biju; Mathew, Jeeno
2018-03-01
Resource Allocation is procedure of doling out or allocating the accessible assets in a monetary way and productive way. Resource allocation is the scheduling of the accessible assets and accessible exercises or activities required while thinking about both the asset accessibility and the total project completion time. Asset provisioning and allocation takes care of that issue by permitting the specialist co-ops to deal with the assets for every individual demand of asset. A probabilistic selection procedure has been developed in order to ensure various selections of chromosomes
Pardon, Marie-Christine; Kendall, David A; Pérez-Diaz, Fernando; Duxon, Mark S; Marsden, Charles A
2004-08-01
The present study investigated whether the 'psychological threat' induced by sensory contact with an aggressive conspecific would be a sufficient factor in inducing behavioural and physiological disturbances. Repeated sensory contact with an aggressive mouse (social threat) in a partitioned cage was compared with repeated exposure to a novel partitioned cage in male NMRI mice. We first examined parameters of stress responsiveness (body weight, plasma corticosterone levels, frequency of self-grooming and defecation). The temperature and physical activity responses to stress were also recorded during and after the 4 weeks of stress using radiotelemetry. Finally, cognitivo-emotional performance was assessed after acute stress and 2 and 4 weeks of stress by measuring decision making, sequential alternation performance and behaviour in the elevated T-maze. Social threat had a greater impact than novel cage exposure on most parameters of stress responsiveness, although mice did not habituate to either stressor. Social threat rapidly led to an anticipatory rise in core body temperature and physical activity before the scheduled stress sessions. Such anticipation developed within the first week and persisted for 9 days after ending the stress procedure. Some memory impairment in the sequential alternation test was found in stressed mice, independent of the stressor. After 4 weeks of stress, inhibitory avoidance in the elevated T-maze was enhanced in socially stressed mice and reduced in novel cage mice. The sustained anticipation of stress in the social threat group preceded aversive responding. It remains to be established whether anticipation contributes to the development of aversive responses.
76 FR 18137 - Amendment of the Schedule of Application Fees
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... Section 309(j) of the Communications Act-- Competitive Bidding Procedures for Commercial Broadcast and... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 1 [GEN Docket No. 86-285; FCC 11-27] Amendment of the Schedule of Application Fees AGENCY: Federal Communications Commission. ACTION: Notice of proposed...
10 CFR 205.308 - Filing schedule and annual reports.
Code of Federal Regulations, 2010 CFR
2010-01-01
....308 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System... to Transmit Electric Energy to A Foreign Country § 205.308 Filing schedule and annual reports. (a) Persons authorized to transmit electric energy from the United States shall promptly file all supplements...
Conditioned Reinforcement Value and Resistance to Change
ERIC Educational Resources Information Center
Shahan, Timothy A.; Podlesnik, Christopher A.
2008-01-01
Three experiments examined the effects of conditioned reinforcement value and primary reinforcement rate on resistance to change using a multiple schedule of observing-response procedures with pigeons. In the absence of observing responses in both components, unsignaled periods of variable-interval (VI) schedule food reinforcement alternated with…
10 CFR 205.308 - Filing schedule and annual reports.
Code of Federal Regulations, 2011 CFR
2011-01-01
....308 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System... to Transmit Electric Energy to A Foreign Country § 205.308 Filing schedule and annual reports. (a) Persons authorized to transmit electric energy from the United States shall promptly file all supplements...
Dessole, Salvatore; Cosmi, Erich; Balata, Antonio; Uras, Luisa; Caserta, Donatella; Capobianco, Giampiero; Ambrosini, Guido
2004-11-01
The purpose of this study was to investigate the incidence, type, location, and risk factors of accidental fetal lacerations during cesarean delivery. Total deliveries, cesarean deliveries, and neonatal records for documented accidental fetal lacerations were reviewed retrospectively in our level III university hospital. The gestational age, the presenting part of the fetus, the cesarean delivery indication, the type of incision, and the surgeon who performed the procedure were recorded. Cesarean deliveries were divided into scheduled, unscheduled, and emergency procedures. Fetal lacerations were divided into mild, moderate, and severe. Neonatal follow-up examinations regarding laceration sequelae were available for 6 months. Of 14926 deliveries, 3108 women were delivered by cesarean birth (20.82%). Neonatal records documented 97 accidental fetal lacerations. Of these accidental lacerations, 94 were mild; 2 were moderate, and 1 was severe. The overall rate of accidental fetal laceration per cesarean delivery was 3.12%; the accidental laceration rate in the cohort of fetuses was 2.46%. The crude odds ratios were 0.34 for scheduled procedures, 0.57 for unscheduled procedures, and 1.7 for emergency procedures. The risk for fetal accidental lacerations was higher in fetuses who underwent emergency cesarean birth and lower for unscheduled and scheduled cesarean births (P < .001). Fetal accidental laceration may occur during cesarean delivery; the incidence is significantly higher during emergency cesarean delivery compared with elective procedures. The patient should be counseled about the occurrence of fetal laceration during cesarean delivery to avoid litigation.
Stubbs, D A; Cohen, S L
1972-11-01
Pigeons performed on a second-order schedule in which fixed-interval components were maintained under a variable-interval schedule. Completion of each fixed-interval component resulted in a brief-stimulus presentation and/or food. The relation of the brief stimulus and food was varied across conditions. Under some conditions, the brief stimulus was never paired with food. Under other conditions, the brief stimulus was paired with food; three different pairing procedures were used: (a) a response produced the simultaneous onset of the stimulus and food; (b) a response produced the stimulus before food with the stimulus remaining on during food presentation; (c) a response produced the stimulus and the offset of the stimulus was simultaneous with the onset of the food cycle. The various pairing and nonpairing operations all produced similar effects on performance. Under all conditions, response rates were positively accelerated within fixed-interval components. Total response rates and Index of Curvature measures were similar across conditions. In one condition, a blackout was paired with food; with this different stimulus in effect, less curvature resulted. The results suggest that pairing of a stimulus is not a necessary condition for within-component patterning under some second-order schedules.
Stubbs, D. Alan; Cohen, Steven L.
1972-01-01
Pigeons performed on a second-order schedule in which fixed-interval components were maintained under a variable-interval schedule. Completion of each fixed-interval component resulted in a brief-stimulus presentation and/or food. The relation of the brief stimulus and food was varied across conditions. Under some conditions, the brief stimulus was never paired with food. Under other conditions, the brief stimulus was paired with food; three different pairing procedures were used: (a) a response produced the simultaneous onset of the stimulus and food; (b) a response produced the stimulus before food with the stimulus remaining on during food presentation; (c) a response produced the stimulus and the offset of the stimulus was simultaneous with the onset of the food cycle. The various pairing and nonpairing operations all produced similar effects on performance. Under all conditions, response rates were positively accelerated within fixed-interval components. Total response rates and Index of Curvature measures were similar across conditions. In one condition, a blackout was paired with food; with this different stimulus in effect, less curvature resulted. The results suggest that pairing of a stimulus is not a necessary condition for within-component patterning under some second-order schedules. PMID:16811634
Improving patient access to an interventional US clinic.
Steele, Joseph R; Clarke, Ryan K; Terrell, John A; Brightmon, Tonya R
2014-01-01
A continuous quality improvement project was conducted to increase patient access to a neurointerventional ultrasonography (US) clinic. The clinic was experiencing major scheduling delays because of an increasing patient volume. A multidisciplinary team was formed that included schedulers, medical assistants, nurses, technologists, and physicians. The team created an Ishikawa diagram of the possible causes of the long wait time to the next available appointment and developed a flowchart of the steps involved in scheduling and completing a diagnostic US examination and biopsy. The team then implemented a staged intervention that included adjustments to staffing and room use (stage 1); new procedures for scheduling same-day add-on appointments (stage 2); and a lead technician rotation to optimize patient flow, staffing, and workflow (stage 3). Six months after initiation of the intervention, the mean time to the next available appointment had decreased from 25 days at baseline to 1 day, and the number of available daily appointments had increased from 38 to 55. These improvements resulted from a coordinated provider effort and had a net present value of more than $275,000. This project demonstrates that structural changes in staffing, workflow, and room use can substantially reduce scheduling delays for critical imaging procedures. © RSNA, 2014.
Gallego-Delgado, María; Villacorta, Eduardo; Valenzuela-Vicente, M Carmen; Walias-Sánchez, Ángela; Ávila, Carmen; Velasco-Cañedo, M Jesús; Cano-Mozo, M Teresa; Martín-García, Agustín; García-Sánchez, María Jesús; Sánchez, Argelina; Cascón, Manuel; Sánchez, Pedro L
2018-05-21
The cardiology day hospital (CDH) is an alternative to hospitalization for scheduled cardiological procedures. The aims of this study were to analyze the activity, quality of care and the cost-effectiveness of a CDH. An observational descriptive study was conducted of the health care activity during the first year of operation of DHHA. The quality of care was analyzed through the substitution rate (outpatient procedures), cancellation rates, complications, and a satisfaction survey. For cost-effectiveness, we calculated the economic savings of avoided hospital stays. A total of 1646 patients were attended (mean age 69 ± 15 years, 60% men); 2550 procedures were scheduled with a cancellation rate of 4%. The most frequently cancelled procedure was electrical cardioversion. The substitution rate for scheduled invasive procedures was 66%. Only 1 patient required readmission after discharge from the CDH due to heart failure. Most surveyed patients (95%) considered the care received in the CDH to be good or very good. The saving due to outpatient-converted procedures made possible by the CDH was € 219 199.55, higher than the cost of the first year of operation. In our center, the CDH allowed more than two thirds of the invasive procedures to be performed on an outpatient basis, while maintaining the quality of care. In the first year of operation, the expenses due to its implementation were offset by a significant reduction in hospital admissions. Copyright © 2018 Sociedad Española de Cardiología. Published by Elsevier España, S.L.U. All rights reserved.
75 FR 8112 - Chloropicrin From China
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-23
... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-130 (Third Review)] Chloropicrin From China AGENCY: United States International Trade Commission. ACTION: Revised schedule for the subject review. DATES: Effective Date: February 17, 2010. FOR FURTHER INFORMATION CONTACT: Cynthia Trainor (202...
Automated Platform Management System Scheduling
NASA Technical Reports Server (NTRS)
Hull, Larry G.
1990-01-01
The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our work and results may be outdated when this paper is published.
Pitch Guidance Optimization for the Orion Abort Flight Tests
NASA Technical Reports Server (NTRS)
Stillwater, Ryan Allanque
2010-01-01
The National Aeronautics and Space Administration created the Constellation program to develop the next generation of manned space vehicles and launch vehicles. The Orion abort system is initiated in the event of an unsafe condition during launch. The system has a controller gains schedule that can be tuned to reduce the attitude errors between the simulated Orion abort trajectories and the guidance trajectory. A program was created that uses the method of steepest descent to tune the pitch gains schedule by an automated procedure. The gains schedule optimization was applied to three potential abort scenarios; each scenario tested using the optimized gains schedule resulted in reduced attitude errors when compared to the Orion production gains schedule.
Vincentini, Olimpia; Izzo, Martina; Maialetti, Francesca; Gonnelli, Elena; Neuhold, Susanna; Silano, Marco
2016-09-01
To allow celiac patients to have meals out, a growing number of restaurants and pizzas houses that simultaneously provide gluten-free (GF) pizzas and wheat-based (WB) pizzas have recently been opened in Italy. In these restaurants, GF pizzas are prepared with GF raw materials, following procedures that minimize the risk of gluten cross-contact. Here, we evaluate the risk of gluten cross-contact of GF pizzas in relation to the preparation procedures, thus aiming at identifying a safe procedure for cooking GF pizzas. Our results show that, when specific requirements are complied with, the simultaneous cooking of GF and WB pizzas is a procedure as safe as having an oven dedicated to GF pizzas or the alternate cooking of GF and WB pizzas in the same oven.
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2012 CFR
2012-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees... Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time required...
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2011 CFR
2011-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees.../Current Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time...
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2014 CFR
2014-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees... Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time required...
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2013 CFR
2013-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees... Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time required...
Project Physics Teacher Guide 3, The Triumph of Mechanics.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
Teaching procedures of Project Physics Unit 3 are presented to help teachers make effective use of learning materials. Unit contents are discussed in connection with teaching aid perspective, multi-media schedules, schedule blocks, and resource charts. Brief analyses are made for transparencies, 16mm films, and reader articles. Included is…
76 FR 67633 - Airworthiness Directives; Dassault Aviation Model Mystere-Falcon 50 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
...) of section 5-10 of the Recommended Maintenance Schedules chapter of the Aircraft Maintenance...) of section 5-10 of the Recommended Maintenance Schedules chapter of the Aircraft Maintenance... Dassault Falcon 50/ 50EX Maintenance Procedure 57-607, Non-Destructive Check of Flap Tracks 2 and 5, of...
40 CFR 86.215-94 - EPA urban dynamometer driving schedule.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 18 2011-07-01 2011-07-01 false EPA urban dynamometer driving schedule. 86.215-94 Section 86.215-94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... New Medium-Duty Passenger Vehicles; Cold Temperature Test Procedures § 86.215-94 EPA urban dynamometer...
Project Physics Teacher Guide 2, Motion in the Heavens.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
Teaching procedures of Project Physics Unit 2 are presented to help teachers make effective use of learning materials. The unit contents are discussed in connection with teaching aid perspectives, multi-media schedules, schedule blocks, and resource charts. Analyses are made for transparencies, 16mm films, and reader articles. Included is…
Project Physics Teacher Guide 6, The Nucleus.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
Teaching procedures of Project Physics Unit 6 are presented to help teachers make effective use of learning materials. Unit contents are discussed in connection with teaching aid lists, multi-media schedules, schedule blocks, and resource charts. Brief summaries are made for transparencies, 16mm films, and reader articles. Included is information…
CTEPP STANDARD OPERATING PROCEDURE FOR SETTING UP A HOUSEHOLD SAMPLING SCHEDULE (SOP-2.10)
This SOP describes the method for scheduling study subjects for field sampling activities in North Carolina (NC) and Ohio (OH). There are three field sampling teams with two staff members on each team. Two field sampling teams collect the field data simultaneously. A third fiel...
Do Conditional Reinforcers Count?
ERIC Educational Resources Information Center
Davison, Michael; Baum, William M.
2006-01-01
Six pigeons were trained on a procedure in which seven components arranged different food-delivery ratios on concurrent variable-interval schedules each session. The components were unsignaled, lasted for 10 food deliveries, and occurred in random order with a 60-s blackout between components. The schedules were arranged using a switching-key…
Project Physics Teacher Guide 4, Light and Electromagnetism.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
Teaching procedures of Project Physics Unit 4 are presented to help teachers make effective use of learning materials. Unit contents are discussed in connection with teaching aid lists, multi-media schedules, schedule blocks, and resources charts. Brief summaries are made for transparencies, 16mm films, and reader articles. Included is information…
46 CFR 282.31 - Subsidy billing procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... (a) Subsidy voucher—(1) Form. Requests for payment of ODS shall be submitted on a public voucher... affidavit. (1) The following schedules shall be used for calculating the amount of ODS payable: Schedule A (Company) ODSA No. ODS Accrued During Fiscal Year 198__ ODS Payable for the Month of Current voucher...
40 CFR 52.2720 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Emission limitation for one source in the Ponce Air Basin was submitted on March 26, 1976, by the... schedules submitted on March 13, 1974, by the Puerto Rico Environmental Quality Board. (13) Information on procedures followed in adoption of compliance schedules submitted on March 15, 1974, by the Puerto Rico...
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2010 CFR
2010-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees.../Current Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time...
19 CFR 122.154 - Notice of arrival.
Code of Federal Regulations, 2014 CFR
2014-04-01
... notice of arrival shall state: (1) Type of aircraft and registration number; (2) Name of aircraft... aircraft entering the U.S. from Cuba must give advance notice of arrival, unless it is an Office of Foreign Assets Control (OFAC) approved scheduled commercial aircraft of a scheduled airline. (b) Procedure for...
19 CFR 122.154 - Notice of arrival.
Code of Federal Regulations, 2012 CFR
2012-04-01
... notice of arrival shall state: (1) Type of aircraft and registration number; (2) Name of aircraft... aircraft entering the U.S. from Cuba must give advance notice of arrival, unless it is an Office of Foreign Assets Control (OFAC) approved scheduled commercial aircraft of a scheduled airline. (b) Procedure for...
19 CFR 122.154 - Notice of arrival.
Code of Federal Regulations, 2011 CFR
2011-04-01
... notice of arrival shall state: (1) Type of aircraft and registration number; (2) Name of aircraft... aircraft entering the U.S. from Cuba must give advance notice of arrival, unless it is an Office of Foreign Assets Control (OFAC) approved scheduled commercial aircraft of a scheduled airline. (b) Procedure for...
19 CFR 122.154 - Notice of arrival.
Code of Federal Regulations, 2013 CFR
2013-04-01
... notice of arrival shall state: (1) Type of aircraft and registration number; (2) Name of aircraft... aircraft entering the U.S. from Cuba must give advance notice of arrival, unless it is an Office of Foreign Assets Control (OFAC) approved scheduled commercial aircraft of a scheduled airline. (b) Procedure for...
1 CFR 17.4 - Procedure and timing for emergency publication.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 1 General Provisions 1 2010-01-01 2010-01-01 false Procedure and timing for emergency publication. 17.4 Section 17.4 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER PREPARATION... Schedule § 17.4 Procedure and timing for emergency publication. (a) Each agency requesting publication on...
ERIC Educational Resources Information Center
Repp, Charles A.; Brach, Ronald C.
The manual provides a rationale, procedural guidelines, time-schedules, instruments, and supporting documentation for student services program evaluation at SUNY Agricultural and Technical College, Delhi. Six procedural guidelines include: (1) all programs and services should be evaluated at least once every four years, with provision for annual…
76 FR 70664 - Policy Statement on Grant Stamp Procedure in Routine Director Orders
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-15
... grant stamp unopposed motions for an extension of time or requests for a procedural schedule to which..., Vice Chairman Begeman, and Commissioner Mulvey. Jeffrey Herzig, Clearance Clerk. Appendix [GRAPHIC...
STS-5 Fifth Space shuttle mission, first operational flight: Press Kit
NASA Technical Reports Server (NTRS)
1982-01-01
Schedules for the fifth Space Shuttle flight are provided. Launching procedure, extravehicular activity, contingency plans, satellite deployment, and onboard experiments are discussed. Landing procedures, tracking facilities, and crew data are provided.
Skin-to-skin contact and/or oral 25% dextrose for procedural pain relief for term newborn infants.
Chermont, Aurimery Gomes; Falcão, Luis Fábio Magno; de Souza Silva, Eduardo Henrique Laurindo; de Cássia Xavier Balda, Rita; Guinsburg, Ruth
2009-12-01
The goal was to compare the efficacy of oral 25% dextrose treatment and/or skin-to-skin contact for analgesia in term newborns during intramuscular injection of a hepatitis B vaccine. A prospective, randomized, partially blinded, clinical trial was performed with 640 healthy term newborns. Infants at 12 to 72 hours of life were assigned randomly to receive an intramuscular injection of hepatitis B vaccine in the right thigh according to 4 analgesia groups, that is, no analgesia (routine); oral 25% dextrose treatment, given 2 minutes before the injection; skin-to-skin contact, initiated 2 minutes before the injection and persisting throughout the procedure; and a combination of the oral dextrose treatment and skin-to-skin contact strategies. For all groups, Neonatal Facial Coding System and Neonatal Infant Pain Scale scores were evaluated before the procedure, during thigh cleansing, during the injection, and 2 minutes after the injection. Premature Infant Pain Profile scores also were assessed for all infants. Pain scores were compared among the 4 groups. The use of oral 25% dextrose treatment reduced the duration of procedural pain in the studied population. Skin-to-skin contact decreased injection pain and duration. The combination of the 2 analgesic measures was more effective than either measure separately for term newborns. Nonpharmacologic analgesic measures were effective for the treatment of procedural pain in term infants. The combination of oral 25% dextrose treatment and skin-to-skin contact acted synergistically to decrease acute pain in healthy neonates.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-09
.... SUMMARY: This notice sets forth the schedule and proposed agenda of a forthcoming meeting of the Advisory... later than Wednesday, September 21, 2011 by contacting Mr. Gregory Green (202) 693-4734. Requests made...
75 FR 20862 - Glyphosate From China
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-21
... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-1178 (Preliminary)] Glyphosate From China AGENCY: United States International Trade Commission. ACTION: Revised schedule for the subject investigation. DATES: Effective Date: April 16, 2010. FOR FURTHER INFORMATION CONTACT: Amy Sherman (202-205-3289...
75 FR 16839 - Sorbitol From France
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-02
... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-44 (Third Review)] Sorbitol From France AGENCY: United States International Trade Commission. ACTION: Revised schedule for the subject review. DATES: Effective Date: Date of Commission approval. FOR FURTHER INFORMATION CONTACT: Dana Lofgren (202...
75 FR 54854 - Science Advisory Board
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-09
... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Science Advisory Board... the schedule and proposed agenda of a forthcoming meeting of the NOAA Science Advisory Board. The... FURTHER INFORMATION CONTACT: Dr. Cynthia Decker, Executive Director, Science Advisory Board, NOAA, Rm...
South Georgia Autograph Parties.
ERIC Educational Resources Information Center
Womack, Geneva H.
1978-01-01
The manager of the South Georgia College Bookstore describes several autograph parties used as a sales promotion technique. The planning process, including initial contacts with the guest authors, are discussed, and the schedules and events of the authors' visits are reviewed. (JMD)
Planning Risk-Based SQC Schedules for Bracketed Operation of Continuous Production Analyzers.
Westgard, James O; Bayat, Hassan; Westgard, Sten A
2018-02-01
To minimize patient risk, "bracketed" statistical quality control (SQC) is recommended in the new CLSI guidelines for SQC (C24-Ed4). Bracketed SQC requires that a QC event both precedes and follows (brackets) a group of patient samples. In optimizing a QC schedule, the frequency of QC or run size becomes an important planning consideration to maintain quality and also facilitate responsive reporting of results from continuous operation of high production analytic systems. Different plans for optimizing a bracketed SQC schedule were investigated on the basis of Parvin's model for patient risk and CLSI C24-Ed4's recommendations for establishing QC schedules. A Sigma-metric run size nomogram was used to evaluate different QC schedules for processes of different sigma performance. For high Sigma performance, an effective SQC approach is to employ a multistage QC procedure utilizing a "startup" design at the beginning of production and a "monitor" design periodically throughout production. Example QC schedules are illustrated for applications with measurement procedures having 6-σ, 5-σ, and 4-σ performance. Continuous production analyzers that demonstrate high σ performance can be effectively controlled with multistage SQC designs that employ a startup QC event followed by periodic monitoring or bracketing QC events. Such designs can be optimized to minimize the risk of harm to patients. © 2017 American Association for Clinical Chemistry.
Effects of an appointment reminder call on patient show rates.
Gariti, P; Alterman, A I; Holub-Beyer, E; Volpicelli, J R; Prentice, N; O'Brien, C P
1995-01-01
A pilot study (N = 80) was conducted to determine if (1) prospective substance-dependent patients randomly selected to be reminded (TC) of their scheduled intake evaluation the day before their first appointment would have a higher show rate than those not contacted (NC); and (2) if TC subjects administered a satisfaction questionnaire 1-3 days after intake would exhibit higher treatment retention rates at one week and one month posttreatment entry than NC subjects not exposed to the questionnaire. The findings suggest that reminding prospective patients of their initial scheduled appointments and following up with phone calls to those who fail to show can improve the rate at which patients will initiate treatment, provided initial appointments are scheduled in a timely manner (7 days or less). Similarly, the combination of the reminder call and the satisfaction questionnaire were associated with higher treatment retention rates for those whose initial appointments were scheduled in a timely manner.
Stepaniak, Pieter S; Heij, Christiaan; Mannaerts, Guido H H; de Quelerij, Marcel; de Vries, Guus
2009-10-01
Gains in operating room (OR) scheduling may be obtained by using accurate statistical models to predict surgical and procedure times. The 3 main contributions of this article are the following: (i) the validation of Strum's results on the statistical distribution of case durations, including surgeon effects, using OR databases of 2 European hospitals, (ii) the use of expert prior expectations to predict durations of rarely observed cases, and (iii) the application of the proposed methods to predict case durations, with an analysis of the resulting increase in OR efficiency. We retrospectively reviewed all recorded surgical cases of 2 large European teaching hospitals from 2005 to 2008, involving 85,312 cases and 92,099 h in total. Surgical times tended to be skewed and bounded by some minimally required time. We compared the fit of the normal distribution with that of 2- and 3-parameter lognormal distributions for case durations of a range of Current Procedural Terminology (CPT)-anesthesia combinations, including possible surgeon effects. For cases with very few observations, we investigated whether supplementing the data information with surgeons' prior guesses helps to obtain better duration estimates. Finally, we used best fitting duration distributions to simulate the potential efficiency gains in OR scheduling. The 3-parameter lognormal distribution provides the best results for the case durations of CPT-anesthesia (surgeon) combinations, with an acceptable fit for almost 90% of the CPTs when segmented by the factor surgeon. The fit is best for surgical times and somewhat less for total procedure times. Surgeons' prior guesses are helpful for OR management to improve duration estimates of CPTs with very few (<10) observations. Compared with the standard way of case scheduling using the mean of the 3-parameter lognormal distribution for case scheduling reduces the mean overreserved OR time per case up to 11.9 (11.8-12.0) min (55.6%) and the mean underreserved OR time per case up to 16.7 (16.5-16.8) min (53.1%). When scheduling cases using the 4-parameter lognormal model the mean overutilized OR time is up to 20.0 (19.7-20.3) min per OR per day lower than for the standard method and 11.6 (11.3-12.0) min per OR per day lower as compared with the biased corrected mean. OR case scheduling can be improved by using the 3-parameter lognormal model with surgeon effects and by using surgeons' prior guesses for rarely observed CPTs. Using the 3-parameter lognormal model for case-duration prediction and scheduling significantly reduces both the prediction error and OR inefficiency.
Chemotherapy and treatment scheduling: the Johns Hopkins Oncology Center Outpatient Department.
Majidi, F.; Enterline, J. P.; Ashley, B.; Fowler, M. E.; Ogorzalek, L. L.; Gaudette, R.; Stuart, G. J.; Fulton, M.; Ettinger, D. S.
1993-01-01
The Chemotherapy and Treatment Scheduling System provides integrated appointment and facility scheduling for very complex procedures. It is fully integrated with other scheduling systems at The Johns Hopkins Oncology Center and is supported by the Oncology Clinical Information System (OCIS). It provides a combined visual and textual environment for the scheduling of events that have multiple dimensions and dependencies on other scheduled events. It is also fully integrated with other clinical decision support and ancillary systems within OCIS. The system has resulted in better patient flow through the ambulatory care areas of the Center. Implementing the system required changes in behavior among physicians, staff, and patients. This system provides a working example of building a sophisticated rule-based scheduling system using a relatively simple paradigm. It also is an example of what can be achieved when there is total integration between the operational and clinical components of patient care automation. PMID:8130453
Job Scheduling Under the Portable Batch System
NASA Technical Reports Server (NTRS)
Henderson, Robert L.; Woodrow, Thomas S. (Technical Monitor)
1995-01-01
The typical batch queuing system schedules jobs for execution by a set of queue controls. The controls determine from which queues jobs may be selected. Within the queue, jobs are ordered first-in, first-run. This limits the set of scheduling policies available to a site. The Portable Batch System removes this limitation by providing an external scheduling module. This separate program has full knowledge of the available queued jobs, running jobs, and system resource usage. Sites are able to implement any policy expressible in one of several procedural language. Policies may range from "bet fit" to "fair share" to purely political. Scheduling decisions can be made over the full set of jobs regardless of queue or order. The scheduling policy can be changed to fit a wide variety of computing environments and scheduling goals. This is demonstrated by the use of PBS on an IBM SP-2 system at NASA Ames.
An Example of Discovery Research Involving the Transfer of Stimulus Control
2005-01-01
The initial purpose of the present study was to replicate procedures for teaching preschool children to recruit attention at appropriate times by having an experimenter signal the availability and unavailability of attention (i.e., arrange a multiple schedule involving reinforcement and extinction; Tiger & Hanley, 2004). Following the development of discriminated social responding, the schedule-correlated stimuli were removed (i.e., a mixed schedule of reinforcement was arranged). However, discriminated responding continued during these conditions. Further evaluation suggested that stimulus control over children's social responding had transferred from the schedule-correlated stimuli to the delivery of reinforcement. The effect of a history of reinforcement under multiple-schedule conditions on performance under mixed schedules was then replicated with 2 participants in a reversal design. These findings suggest that following experience with schedule-correlated stimuli, these stimuli may be removed with only modest disruption to discriminated responding. PMID:16463530
ESSOPE: Towards S/C operations with reactive schedule planning
NASA Technical Reports Server (NTRS)
Wheadon, J.
1993-01-01
The ESSOPE is a prototype front-end tool running on a Sun workstation and interfacing to ESOC's MSSS spacecraft control system for the exchange of telecommand requests (to MSSS) and telemetry reports (from MSSS). ESSOPE combines an operations Planner-Scheduler, with a Schedule Execution Control function. Using an internal 'model' of the spacecraft, the Planner generates a schedule based on utilization requests for a variety of payload services by a community of Olympus users, and incorporating certain housekeeping operations. Conflicts based on operational constraints are automatically resolved, by employing one of several available strategies. The schedule is passed to the execution function which drives MSSS to perform it. When the schedule can no longer be met, either because the operator interferes (by delays or changes of requirements), or because ESSOPE has recognized some spacecraft anomalies, the Planner produces a modified schedule maintaining the on-going procedures as far as consistent with the new constraints or requirements.
Influence of tooth profile on the noncircular gear tooth contact
NASA Astrophysics Data System (ADS)
Cristescu, A.; Andrei, L.; Cristescu, B.
2017-02-01
With noncircular gears, the continuous modification of the tooth meshing, in terms of variation of the tooth profiles and the line of action position and inclination, makes difficult the implementation of a general standard procedure for the analysis of the noncircular gears tooth contact. In this paper, the authors present a graphical approach that enables the tooth contact static pattern to be produced and evaluated in case of a noncircular gear with complex geometry of the pitch curve. The study is virtually developed, in AutoCAD environment, by animating and investigating the gear solid models in mesh. The tooth static contact analysis enables the path of contact area and distribution to be evaluated in correlation with the following variable initial data: gear pitch curve geometry, tooth profile geometry, as a consequence of different generating procedures, and the gear pressure angle. It was found out that the noncircular gear tooth contact could be improved by choosing different procedures for the tooth flank generation in concave and convex zones and by increasing the gear pressure angle.
75 FR 20625 - Barium Chloride From China
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-20
... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-149 (Third Review)] Barium Chloride From China AGENCY: United States International Trade Commission. ACTION: Revised schedule for the subject review. DATES: Effective Date: April 9, 2010. FOR FURTHER INFORMATION CONTACT: Amy Sherman (202-205-3289...
76 FR 63325 - National Indian Gaming Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... DEPARTMENT OF THE INTERIOR National Indian Gaming Commission AGENCY: National Indian Gaming Commission. ACTION: Notice of no action. SUMMARY: On November 18, 2010, the National Indian Gaming Commission... Review Schedule. FOR FURTHER INFORMATION CONTACT: National Indian Gaming Commission, 1441 L Street NW...
75 FR 8114 - Pressure Sensitive Plastic Tape From Italy
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-23
... INTERNATIONAL TRADE COMMISSION [Investigation No. AA1921-167 (Third Review)] Pressure Sensitive Plastic Tape From Italy AGENCY: United States International Trade Commission. ACTION: Revised schedule for the subject review. DATES: Effective Date: February 16, 2010. FOR FURTHER INFORMATION CONTACT: Edward...
Project Physics Teacher Guide 5, Models of the Atom.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
Teaching procedures of Project Physics Unit 5 are presented to help teachers make effective use of learning materials. Unit contents are discussed in connection with teaching aid lists, multi-media schedules, schedule blocks, and resource charts. Brief summaries are made for transparencies, 16mm films, and reader articles. Included is information…
Human Schedule Performance, Protocol Analysis, and the "Silent Dog" Methodology
ERIC Educational Resources Information Center
Cabello, Francisco; Luciano, Carmen; Gomez, Inmaculada; Barnes-Holmes, Dermot
2004-01-01
The purpose of the current experiment was to investigate the role of private verbal behavior on the operant performances of human adults, using a protocol analysis procedure with additional methodological controls (the "silent dog" method). Twelve subjects were exposed to fixed ratio 8 and differential reinforcement of low rate 3-s schedules. For…
Course Scheduling to Find the Minimum Cost Set of Facilities Required.
ERIC Educational Resources Information Center
Seccatore, Luis A.
The problem of determining the quantity of classroom, laboratories and instructors to train sections of students attending numerous distinct courses in a school such as the Fleet Ballistic Missile School is considered. A procedure is developed for determining feasible schedules in order to graduate a fixed number of trainees over time while…
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 32 2011-07-01 2011-07-01 false Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 33 2012-07-01 2012-07-01 false Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 33 2013-07-01 2013-07-01 false Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 32 2014-07-01 2014-07-01 false Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
10 CFR 2.1322 - Participation and schedule for submissions in an oral hearing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Participation and schedule for submissions in an oral hearing. 2.1322 Section 2.1322 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer Applications § 2...
10 CFR 2.1322 - Participation and schedule for submissions in an oral hearing.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Participation and schedule for submissions in an oral hearing. 2.1322 Section 2.1322 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer Applications § 2...
ERIC Educational Resources Information Center
Falcomata, Terry S.; Muething, Colin S.; Gainey, Summer; Hoffman, Katherine; Fragale, Christina
2013-01-01
We evaluated functional communication training (FCT) combined with a chained schedule of reinforcement procedure for the treatment of challenging behavior exhibited by two individuals diagnosed with Asperger syndrome and autism. Following functional analyses that suggested that challenging behavior served multiple functions for both participants,…
14 CFR 91.1029 - Flight scheduling and locating requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... program manager must establish and use an adequate system to schedule and release program aircraft. (b) Except as provided in paragraph (d) of this section, each program manager must have adequate procedures... manager with at least the information required to be included in a VFR flight plan; (2) Provide for timely...
Discriminated Timeout Avoidance in Pigeons: The Roles of Added Stimuli
ERIC Educational Resources Information Center
DeFulio, Anthony; Hackenberg, Timothy D.
2007-01-01
Two experiments examined pigeons' postponement of a signaled extinction period, or timeout (TO), from an ongoing schedule of response-dependent food delivery. A concurrent-operant procedure was used in which responses on one (food) key produced food according to a variable-interval schedule and responses on a second (postponement) key delayed the…
46 CFR 252.41 - Subsidy billing procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for payment of ODS shall be submitted on a public voucher, Standard Forms 1034 and 1034A, which can be... schedules shall be used for calculating the amount of ODS payable: Schedule A (Company) ODSA No. ODS Accrued During Fiscal Year 19__ ODS Payable for the Month of Current voucher Previous voucher Total Total accrued...
Preference for locus of punishment in a response sequence.
NASA Technical Reports Server (NTRS)
Dardano, J. F.
1972-01-01
Study of differences in the aversiveness of response-dependent shock when scheduled on the first, middle or final response of a sequence of 70 responses of food-deprived pigeons, using a procedure to identify relative preferences. The preferred shock schedule and the strength of the preference were found to vary among the pigeons.
Contact stresses in gear teeth: A new method of analysis
NASA Technical Reports Server (NTRS)
Somprakit, Paisan; Huston, Ronald L.; Oswald, Fred B.
1991-01-01
A new, innovative procedure called point load superposition for determining the contact stresses in mating gear teeth. It is believed that this procedure will greatly extend both the range of applicability and the accuracy of gear contact stress analysis. Point load superposition is based upon fundamental solutions from the theory of elasticity. It is an iterative numerical procedure which has distinct advantages over the classical Hertz method, the finite element method, and over existing applications with the boundary element method. Specifically, friction and sliding effects, which are either excluded from or difficult to study with the classical methods, are routinely handled with the new procedure. Presented here are the basic theory and the algorithms. Several examples are given. Results are consistent with those of the classical theories. Applications to spur gears are discussed.
Capriotti, Matthew R; Turkel, Jennifer E; Johnson, Rachel A; Espil, Flint M; Woods, Douglas W
2017-01-01
Chronic tic disorders (CTDs) involve motor and/or vocal tics that often cause substantial distress and impairment. Differential reinforcement of other behavior (DRO) schedules of reinforcement produce robust, but incomplete, reductions in tic frequency in youth with CTDs; however, a more robust reduction may be needed to affect durable clinical change. Standard, fixed-amount DRO schedules have not commonly yielded such reductions, so we evaluated a novel, progressive-amount DRO schedule, based on its ability to facilitate sustained abstinence from functionally similar behaviors. Five youth with CTDs were exposed to periods of baseline, fixed-amount DRO (DRO-F), and progressive-amount DRO (DRO-P). Both DRO schedules produced decreases in tic rate and increases in intertic interval duration, but no systematic differences were seen between the two schedules on any dimension of tic occurrence. The DRO-F schedule was generally preferred to the DRO-P schedule. Possible procedural improvements and other future directions are discussed. © 2016 Society for the Experimental Analysis of Behavior.
SLS-PLAN-IT: A knowledge-based blackboard scheduling system for Spacelab life sciences missions
NASA Technical Reports Server (NTRS)
Kao, Cheng-Yan; Lee, Seok-Hua
1992-01-01
The primary scheduling tool in use during the Spacelab Life Science (SLS-1) planning phase was the operations research (OR) based, tabular form Experiment Scheduling System (ESS) developed by NASA Marshall. PLAN-IT is an artificial intelligence based interactive graphic timeline editor for ESS developed by JPL. The PLAN-IT software was enhanced for use in the scheduling of Spacelab experiments to support the SLS missions. The enhanced software SLS-PLAN-IT System was used to support the real-time reactive scheduling task during the SLS-1 mission. SLS-PLAN-IT is a frame-based blackboard scheduling shell which, from scheduling input, creates resource-requiring event duration objects and resource-usage duration objects. The blackboard structure is to keep track of the effects of event duration objects on the resource usage objects. Various scheduling heuristics are coded in procedural form and can be invoked any time at the user's request. The system architecture is described along with what has been learned with the SLS-PLAN-IT project.
MacDuff, G S; Krantz, P J; McClannahan, L E
1993-01-01
We used a graduated guidance procedure to teach 4 boys with autism to follow photographic activity schedules to increase on-task and on-schedule behavior. The multiple baseline across participants design included baseline, teaching, maintenance, resequencing of photographs, and generalization to novel photographs phases. The results indicated that photographic activity schedules (albums depicting after-school activities) produced sustained engagement, and skills generalized to a new sequence of photographs and to new photographs. The acquisition of schedule-following skills enabled these children with severe developmental disabilities to display lengthy response chains, independently change activities, and change activities in different group home settings in the absence of immediate supervision and prompts from others. PMID:8473261
Xing, KeYi; Han, LiBin; Zhou, MengChu; Wang, Feng
2012-06-01
Deadlock-free control and scheduling are vital for optimizing the performance of automated manufacturing systems (AMSs) with shared resources and route flexibility. Based on the Petri net models of AMSs, this paper embeds the optimal deadlock avoidance policy into the genetic algorithm and develops a novel deadlock-free genetic scheduling algorithm for AMSs. A possible solution of the scheduling problem is coded as a chromosome representation that is a permutation with repetition of parts. By using the one-step look-ahead method in the optimal deadlock control policy, the feasibility of a chromosome is checked, and infeasible chromosomes are amended into feasible ones, which can be easily decoded into a feasible deadlock-free schedule. The chromosome representation and polynomial complexity of checking and amending procedures together support the cooperative aspect of genetic search for scheduling problems strongly.
Job Shop Scheduling Focusing on Role of Buffer
NASA Astrophysics Data System (ADS)
Hino, Rei; Kusumi, Tetsuya; Yoo, Jae-Kyu; Shimizu, Yoshiaki
A scheduling problem is formulated in order to consistently manage each manufacturing resource, including machine tools, assembly robots, AGV, storehouses, material shelves, and so on. The manufacturing resources are classified into three types: producer, location, and mover. This paper focuses especially on the role of the buffer, and the differences among these types are analyzed. A unified scheduling formulation is derived from the analytical results based on the resource’s roles. Scheduling procedures based on dispatching rules are also proposed in order to numerically evaluate job shop-type production having finite buffer capacity. The influences of the capacity of bottle-necked production devices and the buffer on productivity are discussed.
Landa, Robin; Hanley, Gregory P
2016-06-01
Using procedures similar to those of Tiger, Hanley, and Heal (2006), we compared two multiple-schedule variations (S+/S- and S+ only) to treat high-rate requests for edible items in the Picture Exchange Communication System (PECS). Two individuals with autism participated, after they showed persistent requests for edible items after PECS training. Stimulus control was achieved only with the multiple schedule that involved presentation of a discriminative stimulus during reinforcement components and its removal during extinction components (S+ only). Discriminated requests were maintained for the 1 participant who experienced schedule thinning. © 2016 Society for the Experimental Analysis of Behavior.
Post-procedural evaluation of catheter contact force characteristics
NASA Astrophysics Data System (ADS)
Koch, Martin; Brost, Alexander; Kiraly, Atilla; Strobel, Norbert; Hornegger, Joachim
2012-03-01
Minimally invasive catheter ablation of electric foci, performed in electrophysiology labs, is an attractive treatment option for atrial fibrillation (AF) - in particular if drug therapy is no longer effective or tolerated. There are different strategies to eliminate the electric foci inducing the arrhythmia. Independent of the particular strategy, it is essential to place transmural lesions. The impact of catheter contact force on the generated lesion quality has been investigated recently, and first results are promising. There are different approaches to measure catheter-tissue contact. Besides traditional haptic feedback, there are new technologies either relying on catheter tip-to-tissue contact force or on local impedance measurements at the tip of the catheter. In this paper, we present a novel tool for post-procedural ablation point evaluation and visualization of contact force characteristics. Our method is based on localizing ablation points set during AF ablation procedures. The 3-D point positions are stored together with lesion specific catheter contact force (CF) values recorded during the ablation. The force records are mapped to the spatial 3-D positions, where the energy has been applied. The tracked positions of the ablation points can be further used to generate a 3-D mesh model of the left atrium (LA). Since our approach facilitates visualization of different force characteristics for post-procedural evaluation and verification, it has the potential to improve outcome by highlighting areas where lesion quality may be less than desired.
NASA Technical Reports Server (NTRS)
Callantine, Todd J.; Cabrall, Christopher; Kupfer, Michael; Omar, Faisal G.; Prevot, Thomas
2012-01-01
NASA?s Air Traffic Management Demonstration-1 (ATD-1) is a multi-year effort to demonstrate high-throughput, fuel-efficient arrivals at a major U.S. airport using NASA-developed scheduling automation, controller decision-support tools, and ADS-B-enabled Flight-Deck Interval Management (FIM) avionics. First-year accomplishments include the development of a concept of operations for managing scheduled arrivals flying Optimized Profile Descents with equipped aircraft conducting FIM operations, and the integration of laboratory prototypes of the core ATD-1 technologies. Following each integration phase, a human-in-the-loop simulation was conducted to evaluate and refine controller tools, procedures, and clearance phraseology. From a ground-side perspective, the results indicate the concept is viable and the operations are safe and acceptable. Additional training is required for smooth operations that yield notable benefits, particularly in the areas of FIM operations and clearance phraseology.
1997-05-01
KENNEDY SPACE CENTER, FLA. -- KSC payloads processing employees work to reservice the Microgravity Science Laboratory-1 (MSL-1) Spacelab module in the Space Shuttle Orbiter Columbia’s payload bay for the STS-94 mission in Orbiter Processing Facility 1. That mission is now scheduled to lift off in early July. This was the first time that this type of payload was reserviced without removing it from the payload bay. This new procedure pioneers processing efforts for quick relaunch turnaround times for future payloads. The Spacelab module was scheduled to fly again with the full complement of STS-83 experiments after that mission was cut short due to a faulty fuel cell. During the scheduled 16-day STS-94 mission, the experiments will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the flight crew conducts combustion, protein crystal growth and materials processing experiments
1997-05-01
KENNEDY SPACE CENTER, FLA. -- KSC payloads processing employees work to reservice the Microgravity Science Laboratory-1 (MSL-1) Spacelab module in the Space Shuttle Orbiter Columbia’s payload bay for the STS-94 mission in Orbiter Processing Facility 1. That mission is now scheduled to lift off in early July. This was the first time that this type of payload was reserviced without removing it from the payload bay. This new procedure pioneers processing efforts for quick relaunch turnaround times for future payloads. The Spacelab module was scheduled to fly again with the full complement of STS-83 experiments after that mission was cut short due to a faulty fuel cell. During the scheduled 16-day STS-94 mission, the experiments will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the flight crew conducts combustion, protein crystal growth and materials processing experiments
1997-05-01
KSC payloads processing employees work to reservice the Microgravity Science Laboratory-1 (MSL-1) Spacelab module in the Space Shuttle Orbiter Columbia’s payload bay for the STS-94 mission in Orbiter Processing Facility 1. That mission is now scheduled to lift off in early July. This was the first time that this type of payload was reserviced without removing it from the payload bay. This new procedure pioneers processing efforts for quick relaunch turnaround times for future payloads. The Spacelab module was scheduled to fly again with the full complement of STS-83 experiments after that mission was cut short due to a faulty fuel cell. During the scheduled 16-day STS-94 mission, the experiments will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the flight crew conducts combustion, protein crystal growth and materials processing experiments
MacDonall, James S
2017-09-01
Some have reported changing the schedule at one alternative of a concurrent schedule changed responding at the other alternative (Catania, 1969), which seems odd because no contingencies were changed there. When concurrent schedules are programmed using two schedules, one associated with each alternative that operate continuously, changing the schedule at one alternative also changes the switch schedule at the other alternative. Thus, changes in responding at the constant alternative could be due to the change in the switch schedule. To assess this possibility, six rats were exposed to a series of conditions that alternated between pairs of interval schedules at both alternatives and a pair of interval schedules at one, constant, alternative and a pair of extinction schedules at the other alternative. Comparing run lengths, visit durations and response rates at the constant alternative in the alternating conditions did not show consistent increases and decreases when a strict criterion for changes was used. Using a less stringent definition (any change in mean values) showed changes. The stay/switch analysis suggests it may be inaccurate to apply behavioral contrast to procedures that change from concurrent variable-interval variable-interval schedules to concurrent variable-interval extinction schedules because the contingencies in neither alternative are constant. © 2017 Society for the Experimental Analysis of Behavior.
14 CFR 145.3 - Definition of terms.
Code of Federal Regulations, 2011 CFR
2011-01-01
... maintenance resulting from unforeseen events; or (2) Scheduled checks that contain servicing and/or... regulations and serving as the primary contact with the FAA. (b) Article means an aircraft, airframe, aircraft... for the work of a certificated repair station that performs maintenance, preventive maintenance...
14 CFR 145.3 - Definition of terms.
Code of Federal Regulations, 2013 CFR
2013-01-01
... maintenance resulting from unforeseen events; or (2) Scheduled checks that contain servicing and/or... regulations and serving as the primary contact with the FAA. (b) Article means an aircraft, airframe, aircraft... for the work of a certificated repair station that performs maintenance, preventive maintenance...
14 CFR 145.3 - Definition of terms.
Code of Federal Regulations, 2012 CFR
2012-01-01
... maintenance resulting from unforeseen events; or (2) Scheduled checks that contain servicing and/or... regulations and serving as the primary contact with the FAA. (b) Article means an aircraft, airframe, aircraft... for the work of a certificated repair station that performs maintenance, preventive maintenance...
14 CFR 145.3 - Definition of terms.
Code of Federal Regulations, 2014 CFR
2014-01-01
... maintenance resulting from unforeseen events; or (2) Scheduled checks that contain servicing and/or... regulations and serving as the primary contact with the FAA. (b) Article means an aircraft, airframe, aircraft... for the work of a certificated repair station that performs maintenance, preventive maintenance...
14 CFR 145.3 - Definition of terms.
Code of Federal Regulations, 2010 CFR
2010-01-01
... maintenance resulting from unforeseen events; or (2) Scheduled checks that contain servicing and/or... regulations and serving as the primary contact with the FAA. (b) Article means an aircraft, airframe, aircraft... for the work of a certificated repair station that performs maintenance, preventive maintenance...
How Superintendents Spend Their Working Time.
ERIC Educational Resources Information Center
Friesen, David; Duignan, Patrick
1980-01-01
Observations of superintendents indicate that, within the plethora of tasks and activities, the hectic variety of demands and contacts of their jobs, the superintendents cope with rather than organize their time schedules. Still, the superintendents seem to attend to the most vital activities. (Author/IRT)
33 CFR 146.140 - Emergency Evacuation Plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... be contacted; (5) List the facility's communications equipment, its available frequencies, and the communications schedules with shore installations, standby vessels, rescue aircraft, and other OCS facilities... its personnel would be placed in jeopardy and a mass evacuation of the facility's personnel would be...
75 FR 18238 - Ironing Tables and Certain Parts Thereof From China
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-09
... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-1047 (Review)] Ironing Tables and Certain Parts Thereof From China AGENCY: United States International Trade Commission. ACTION: Revised schedule for the subject review. DATES: Effective Date: April 5, 2010. FOR FURTHER INFORMATION CONTACT...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-27
... scheduled to convene on April 2, 2013 has been cancelled. Please contact Ben O'Dell for any additional...: March 21, 2013. Ben O'Dell, Associate Director for Center for Faith-based and Neighborhood Partnerships...
Travel Information Questionnaire Vistor Support Questionaire Telescope Schedules Astronomer's Tools Contact Acknowledgments TS4 History ISPI ISPI Exposure Time Calculator OSIRIS Spartan Optical Imagers Filter list for more information on the available filters. Time Synchronization For projects that require
76 FR 58790 - Notice of Interim Approval
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-22
.... FOR FURTHER INFORMATION CONTACT: Virgil G. Hobbs, III, Assistant Administrator, Finance & Marketing... September 30, 2013. The power marketing policy provides peaking capacity, along with 1500 hours of energy... schedules have been developed to cover the differing marketing arrangements in the Cumberland System under...
76 FR 2672 - Science Advisory Board Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-14
... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Science Advisory Board... forth the schedule and proposed agenda of a forthcoming meeting of the NOAA Science Advisory Board. The... CONTACT: Dr. Cynthia Decker, Executive Director, Science Advisory Board, NOAA, Rm. 11230, 1315 East-West...
Solving a Production Scheduling Problem by Means of Two Biobjective Metaheuristic Procedures
NASA Astrophysics Data System (ADS)
Toncovich, Adrián; Oliveros Colay, María José; Moreno, José María; Corral, Jiménez; Corral, Rafael
2009-11-01
Production planning and scheduling problems emphasize the need for the availability of management tools that can help to assure proper service levels to customers, maintaining, at the same time, the production costs at acceptable levels and maximizing the utilization of the production facilities. In this case, a production scheduling problem that arises in the context of the activities of a company dedicated to the manufacturing of furniture for children and teenagers is addressed. Two bicriteria metaheuristic procedures are proposed to solve the sequencing problem in a production equipment that constitutes the bottleneck of the production process of the company. The production scheduling problem can be characterized as a general flow shop with sequence dependant setup times and additional inventory constraints. Two objectives are simultaneously taken into account when the quality of the candidate solutions is evaluated: the minimization of completion time of all jobs, or makespan, and the minimization of the total flow time of all jobs. Both procedures are based on a local search strategy that responds to the structure of the simulated annealing metaheuristic. In this case, both metaheuristic approaches generate a set of solutions that provides an approximation to the optimal Pareto front. In order to evaluate the performance of the proposed techniques a series of experiments was conducted. After analyzing the results, it can be said that the solutions provided by both approaches are adequate from the viewpoint of the quality as well as the computational effort involved in their generation. Nevertheless, a further refinement of the proposed procedures should be implemented with the aim of facilitating a quasi-automatic definition of the solution parameters.
A Procedure for 3-D Contact Stress Analysis of Spiral Bevel Gears
NASA Technical Reports Server (NTRS)
Kumar, A.; Bibel, G.
1994-01-01
Contact stress distribution of spiral bevel gears using nonlinear finite element static analysis is presented. Procedures have been developed to solve the nonlinear equations that identify the gear and pinion surface coordinates based on the kinematics of the cutting process and orientate the pinion and the gear in space to mesh with each other. Contact is simulated by connecting GAP elements along the intersection of a line from each pinion point (parallel to the normal at the contact point) with the gear surface. A three dimensional model with four gear teeth and three pinion teeth is used to determine the contact stresses at two different contact positions in a spiral bevel gearset. A summary of the elliptical contact stress distribution is given. This information will be helpful to helicopter and aircraft transmission designers who need to minimize weight of the transmission and maximize reliability.
Yun, Sang-Seok; Choi, JongSuk; Park, Sung-Kee; Bong, Gui-Young; Yoo, HeeJeong
2017-07-01
We designed a robot system that assisted in behavioral intervention programs of children with autism spectrum disorder (ASD). The eight-session intervention program was based on the discrete trial teaching protocol and focused on two basic social skills: eye contact and facial emotion recognition. The robotic interactions occurred in four modules: training element query, recognition of human activity, coping-mode selection, and follow-up action. Children with ASD who were between 4 and 7 years old and who had verbal IQ ≥ 60 were recruited and randomly assigned to the treatment group (TG, n = 8, 5.75 ± 0.89 years) or control group (CG, n = 7; 6.32 ± 1.23 years). The therapeutic robot facilitated the treatment intervention in the TG, and the human assistant facilitated the treatment intervention in the CG. The intervention procedures were identical in both groups. The primary outcome measures included parent-completed questionnaires, the Autism Diagnostic Observation Schedule (ADOS), and frequency of eye contact, which was measured with the partial interval recording method. After completing treatment, the eye contact percentages were significantly increased in both groups. For facial emotion recognition, the percentages of correct answers were increased in similar patterns in both groups compared to baseline (P > 0.05), with no difference between the TG and CG (P > 0.05). The subjects' ability to play, general behavioral and emotional symptoms were significantly diminished after treatment (p < 0.05). These results showed that the robot-facilitated and human-facilitated behavioral interventions had similar positive effects on eye contact and facial emotion recognition, which suggested that robots are useful mediators of social skills training for children with ASD. Autism Res 2017,. © 2017 International Society for Autism Research, Wiley Periodicals, Inc. Autism Res 2017, 10: 1306-1323. © 2017 International Society for Autism Research, Wiley Periodicals, Inc. © 2017 International Society for Autism Research, Wiley Periodicals, Inc.
Amphetamine increases schedule-induced drinking reduced by negative punishment procedures.
Pérez-Padilla, Angeles; Pellón, Ricardo
2003-05-01
d-Amphetamine has been reported to increase schedule-induced drinking punished by lick-dependent signalled delays in food delivery. This might reflect a drug-behaviour interaction dependent on the type of punisher, because no such effect has been found when drinking was reduced by lick-contingent electric shocks. However, the anti-punishment effect of amphetamine could be mediated by other behavioural processes, such as a loss of discriminative control or an increase in the value of delayed reinforcers. To test the effects of d-amphetamine on the acquisition and maintenance of schedule-induced drinking reduced by unsignalled delays in food delivery. Rats received 10-s unsignalled delays initiated by each lick after polydipsia was induced by a fixed-time 30-s food reinforcement schedule or from the outset of the experiment. Yoked-control rats received these same delays but independently of their own behaviour. d-Amphetamine (0.1-3.0 mg/kg) was then tested IP. d-Amphetamine dose-dependently increased and then decreased punished schedule-induced drinking. The drug led to dose-dependent reductions when the delays were not contingent or when they were applied from the outset of training. These results support the contention that d-amphetamine has an increasing effect on schedule-induced drinking that has been previously reduced by a negative punishment procedure. This effect cannot be attributed to other potentially involved processes, and therefore support the idea that drug effects on punished behaviour depend on punishment being delays in food or shock deliveries.
A Novel Face-on-Face Contact Method for Nonlinear Solid Mechanics
NASA Astrophysics Data System (ADS)
Wopschall, Steven Robert
The implicit solution to contact problems in nonlinear solid mechanics poses many difficulties. Traditional node-to-segment methods may suffer from locking and experience contact force chatter in the presence of sliding. More recent developments include mortar based methods, which resolve local contact interactions over face-pairs and feature a kinematic constraint in integral form that smoothes contact behavior, especially in the presence of sliding. These methods have been shown to perform well in the presence of geometric nonlinearities and are demonstratively more robust than node-to-segment methods. These methods are typically biased, however, interpolating contact tractions and gap equations on a designated non-mortar face, which leads to an asymmetry in the formulation. Another challenge is constraint enforcement. The general selection of the active set of constraints is brought with difficulty, often leading to non-physical solutions and easily resulting in missed face-pair interactions. Details on reliable constraint enforcement methods are lacking in the greater contact literature. This work presents an unbiased contact formulation utilizing a median-plane methodology. Up to linear polynomials are used for the discrete pressure representation and integral gap constraints are enforced using a novel subcycling procedure. This procedure reliably determines the active set of contact constraints leading to physical and kinematically admissible solutions void of heuristics and user action. The contact method presented herein successfully solves difficult quasi-static contact problems in the implicit computational setting. These problems feature finite deformations, material nonlinearity, and complex interface geometries, all of which are challenging characteristics for contact implementations and constraint enforcement algorithms. The subcycling procedure is a key feature of this method, handling active constraint selection for complex interfaces and mesh geometries.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Changes in rate... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Procedures for Changing Tariffs § 154.204 Changes...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Changes in rate... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Procedures for Changing Tariffs § 154.204 Changes...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Changes in rate... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Procedures for Changing Tariffs § 154.204 Changes...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Changes in rate... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Procedures for Changing Tariffs § 154.204 Changes...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Changes in rate... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Procedures for Changing Tariffs § 154.204 Changes...
ERIC Educational Resources Information Center
Jimenez-Gomez, Corina; Shahan, Timothy A.
2012-01-01
An extensive body of research using concurrent-chains schedules of reinforcement has shown that choice for one of two differentially valued food-associated stimuli is dependent upon the overall temporal context in which those stimuli are embedded. The present experiments examined whether the concurrent chains procedure was useful for the study of…
47 CFR 1.1152 - Schedule of annual regulatory fees and filing locations for wireless radio services.
Code of Federal Regulations, 2014 CFR
2014-10-01
... locations for wireless radio services. 1.1152 Section 1.1152 Telecommunication FEDERAL COMMUNICATIONS... Procedures for Payment § 1.1152 Schedule of annual regulatory fees and filing locations for wireless radio..., St. Louis, MO 63197-9000. General Mobile Radio Service (a) New, Renew/Mod (FCC 605 & 159) 5.00 FCC, P...
47 CFR 1.1152 - Schedule of annual regulatory fees and filing locations for wireless radio services.
Code of Federal Regulations, 2012 CFR
2012-10-01
... locations for wireless radio services. 1.1152 Section 1.1152 Telecommunication FEDERAL COMMUNICATIONS... Procedures for Payment § 1.1152 Schedule of annual regulatory fees and filing locations for wireless radio..., P.O. Box 979097, St. Louis, MO 63197-9000. General Mobile Radio Service: (a) New, Renew/Mod (FCC 605...
47 CFR 1.1152 - Schedule of annual regulatory fees and filing locations for wireless radio services.
Code of Federal Regulations, 2013 CFR
2013-10-01
... locations for wireless radio services. 1.1152 Section 1.1152 Telecommunication FEDERAL COMMUNICATIONS... Procedures for Payment § 1.1152 Schedule of annual regulatory fees and filing locations for wireless radio..., P.O. Box 979097, St. Louis, MO 63197-9000. General Mobile Radio Service (a) New, Renew/Mod (FCC 605...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Participation and schedule for submission in a hearing consisting of written comments. 2.1321 Section 2.1321 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Participation and schedule for submission in a hearing consisting of written comments. 2.1321 Section 2.1321 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-02
... Broadcast Construction Permits Scheduled for May 6, 2014; Comment Sought on Competitive Bidding Procedures... announces the auction of certain AM broadcast construction permits. Auction 84 will be a ``closed'' auction..., New York. II. Construction Permits In Auction 84 2. The Bureaus will proceed to auction for 22 new...
ERIC Educational Resources Information Center
Cammilleri, Anthony P.; Tiger, Jeffrey H.; Hanley, Gregory P.
2008-01-01
Children may recruit their teachers' attention at undesirably high rates or at inconvenient times. Tiger and Hanley (2004) described a multiple-schedule procedure to reduce ill-timed requests, which involved providing children with two distinct continuous signals that were correlated with periods in which teacher attention was either available or…
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 1 2010-07-01 2010-07-01 false Commercial Activities Inventory Report and Five-Year Review Schedule B Appendix B to Part 169a National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Pt. 169a, App. B Appendix...
ERIC Educational Resources Information Center
DeFulio, Anthony; Hackenberg, Timothy D.
2008-01-01
Pigeons pecked a response key on a variable-interval (VI) schedule, in which responses produced food every 40 s, on average. These VI periods, or components, alternated in irregular fashion with extinction components in which food was unavailable. Pecks on a second (observing) key briefly produced exteroceptive stimuli (houselight flashes)…
Effects of bolt-hole contact on bearing-bypass damage-onset strength
NASA Technical Reports Server (NTRS)
Crews, John H., Jr.; Naik, Rajiv A.
1991-01-01
A combined experimental and analytical study was conducted to investigate the effects of bolt-hole contact on the bearing bypass strength of a graphite-epoxy laminate. Tests were conducted on specimens consisting of 16-ply quasi-isotropic T300/5208 laminates with a centrally located hole. Bearing loads were applied through a clearance-fit steel bolt. Damage onset strength and damage mode were determined for each test case. A finite element procedure was used to calculate the bolt-hole stresses and bolt contact for each test case. A finite element procedure was used to calculate the bolt-hole stresses and bolt contact for each measured damage-onset strength. For the tension bearing-bypass cases tested, the bolt contact half-angle was approximately 60 degrees at damage onset. For compression, the contact angle was 20 degrees as the bypass load increased. A corresponding decrease in the bearing damage onset strength was attributed to the decrease in contact angle which made the bearing loads more severe. Hole boundary stresses were also computed by superimposing stresses for separate bearing and bypass loading. Stresses at the specimen net section were accurately approximated by the superposition procedure. However, the peak bearing stresses had large errors because the bolt contact angles were not represented correctly. For compression, peak bearing stress errors of nearly 50 percent were calculated.
The Associate Principal Astronomer for AI Management of Automatic Telescopes
NASA Technical Reports Server (NTRS)
Henry, Gregory W.
1998-01-01
This research program in scheduling and management of automatic telescopes had the following objectives: 1. To field test the 1993 Automatic Telescope Instruction Set (ATIS93) programming language, which was specifically developed to allow real-time control of an automatic telescope via an artificial intelligence scheduler running on a remote computer. 2. To develop and test the procedures for two-way communication between a telescope controller and remote scheduler via the Internet. 3. To test various concepts in Al scheduling being developed at NASA Ames Research Center on an automatic telescope operated by Tennessee State University at the Fairborn Observatory site in southern Arizona. and 4. To develop a prototype software package, dubbed the Associate Principal Astronomer, for the efficient scheduling and management of automatic telescopes.
76 FR 68037 - Federal Acquisition Regulation; Sudan Waiver Process
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
... integrity (see the Past Performance Information Retrieval System including the Federal Awardee Performance... support of the waiver request review. DATES: Effective Date: December 2, 2011. FOR FURTHER INFORMATION... information pertaining to status or publication schedules, contact the FAR Secretariat at (202) 501-4755...
77 FR 20655 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-05
... what happens to records when no longer needed for current Government business. They authorize the... Management Services (ACNR) using one of the following means: Mail: NARA (ACNR), 8601 Adelphi Road, College... request. FOR FURTHER INFORMATION CONTACT: Margaret Hawkins, Director, National Records Management Program...
77 FR 59991 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-01
... what happens to records when no longer needed for current Government business. They authorize the... Records Management Services (ACNR) using one of the following means: Mail: NARA (ACNR), 8601 Adelphi Road... their request. FOR FURTHER INFORMATION CONTACT: Margaret Hawkins, Director, Records Management Services...
77 FR 58179 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-19
... what happens to records when no longer needed for current Government business. They authorize the... notice by contacting Records Management Services (ACNR) using one of the following means: Mail: NARA..., National Records Management Program (ACNR), National Archives and Records Administration, 8601 Adelphi Road...
78 FR 30340 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-22
... what happens to records when no longer needed for current Government business. They authorize the... Management Services (ACNR) using one of the following means: Mail: NARA (ACNR), 8601 Adelphi Road, College... request. FOR FURTHER INFORMATION CONTACT: Margaret Hawkins, Director, Records Management Services (ACNR...
Code of Federal Regulations, 2010 CFR
2010-10-01
... obtaining approval of a TUS is encouraged to establish early contact with each appropriate Federal agency so... processing of an application may be tentatively scheduled. (b) Reasonable preapplication activities in areas... permanent damage to the values for which the area was established or unreasonably interfere with other...
76 FR 39108 - HIT Policy Committee's Workgroup Meetings; Notice of Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-05
...: Meaningful Use, Privacy & Security Tiger Team, Quality Measures, Governance, Adoption/Certification, and... with the Federal Health IT Strategic Plan and that includes recommendations on the areas in which... revised schedules as it becomes available. Contact Person: Judy Sparrow, Office of the National...
76 FR 46297 - HIT Policy Committee's Workgroup Meetings; Notice of Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-02
... with the Federal Health IT Strategic Plan and that includes recommendations on the areas in which... site for additional information or revised schedules as it becomes available. Contact Person: Judy...., meaningful use, information exchange, privacy and security, quality measures, governance, or adoption...
78 FR 47021 - Excepted Service
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-02
... a single agency that were established or revoked from May 1, 2013, to May 31, 2013. FOR FURTHER INFORMATION CONTACT: Senior Executive Resources Services, Senior Executive Services and Performance Management... Regulations (CFR). Schedule A, B, and C appointing authorities applicable to a single agency are not codified...
Stepaniak, Pieter S; Soliman Hamad, Mohamed A; Dekker, Lukas R C; Koolen, Jacques J
2014-01-01
In this study, we sought to analyze the stochastic behavior of Catherization Laboratories (Cath Labs) procedures in our institution. Statistical models may help to improve estimated case durations to support management in the cost-effective use of expensive surgical resources. We retrospectively analyzed all the procedures performed in the Cath Labs in 2012. The duration of procedures is strictly positive (larger than zero) and has mostly a large minimum duration. Because of the strictly positive character of the Cath Lab procedures, a fit of a lognormal model may be desirable. Having a minimum duration requires an estimate of the threshold (shift) parameter of the lognormal model. Therefore, the 3-parameter lognormal model is interesting. To avoid heterogeneous groups of observations, we tested every group-cardiologist-procedure combination for the normal, 2- and 3-parameter lognormal distribution. The total number of elective and emergency procedures performed was 6,393 (8,186 h). The final analysis included 6,135 procedures (7,779 h). Electrophysiology (intervention) procedures fit the 3-parameter lognormal model 86.1% (80.1%). Using Friedman test statistics, we conclude that the 3-parameter lognormal model is superior to the 2-parameter lognormal model. Furthermore, the 2-parameter lognormal is superior to the normal model. Cath Lab procedures are well-modelled by lognormal models. This information helps to improve and to refine Cath Lab schedules and hence their efficient use.
75 FR 39281 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-08
... reports, security procedures, public relations policies and procedures, news releases and scripts of media... activities as policy development, budget development, congressional and public relations, and project... disposal or reduce the retention period of records already authorized for disposal. NARA invites public...
Automated Planning and Scheduling for Orbital Express (151)
NASA Technical Reports Server (NTRS)
Knight, Russell
2008-01-01
The challenging timeline for DARPA's Orbital Express mission demanded a flexible, responsive, and (above all) safe approach to mission planning. Because the mission was a technology demonstration, pertinent planning information was learned during actual mission execution. This information led to amendments to procedures, which led to changes in the mission plan. In general, we used the ASPEN planner scheduler to generate and validate the mission plans. We enhanced ASPEN to enable it to reason about uncertainty. We also developed a model generator that would read the text of a procedure and translate it into an ASPEN model. These technologies had a significant impact on the success of the Orbital Express mission.
Efficiency Benefits Using the Terminal Area Precision Scheduling and Spacing System
NASA Technical Reports Server (NTRS)
Thipphavong, Jane; Swenson, Harry N.; Lin, Paul; Seo, Anthony Y.; Bagasol, Leonard N.
2011-01-01
NASA has developed a capability for terminal area precision scheduling and spacing (TAPSS) to increase the use of fuel-efficient arrival procedures during periods of traffic congestion at a high-density airport. Sustained use of fuel-efficient procedures throughout the entire arrival phase of flight reduces overall fuel burn, greenhouse gas emissions and noise pollution. The TAPSS system is a 4D trajectory-based strategic planning and control tool that computes schedules and sequences for arrivals to facilitate optimal profile descents. This paper focuses on quantifying the efficiency benefits associated with using the TAPSS system, measured by reduction of level segments during aircraft descent and flight distance and time savings. The TAPSS system was tested in a series of human-in-the-loop simulations and compared to current procedures. Compared to the current use of the TMA system, simulation results indicate a reduction of total level segment distance by 50% and flight distance and time savings by 7% in the arrival portion of flight (200 nm from the airport). The TAPSS system resulted in aircraft maintaining continuous descent operations longer and with more precision, both achieved under heavy traffic demand levels.
Development of economical improved thick film solar cell contact
NASA Technical Reports Server (NTRS)
Ross, B.
1979-01-01
Metal screened electrodes were investigated with base metal pastes and silver systems being focused upon. Contact resistance measurements were refined. A facility allowing fixing in hydrogen and other atmospheres was acquired. Several experiments were made applying screenable pastes to solar cells. Doping investigations emphasized eutectic alloys reduced to powders. Metal systems were reviewed and base metal experiments were done with nickel and copper using lead and tin as the frit metals. Severe adhesion problems were experienced with hydrogen atmospheres in all metal systems. A two step firing schedule was devised. Aluminum-silicon and aluminum-germanium eutectic doping additions to copper pastes were tried on 2 1/4 in diameter solar cell back contacts, both with good results.
Martinek, Martin; Lemes, Christine; Sigmund, Elisabeth; Derndorfer, Michael; Aichinger, Josef; Winter, Siegmund; Nesser, Hans-Joachim; Pürerfellner, Helmut
2012-11-01
Electrode-tissue contact is crucial for adequate lesion formation in radiofrequency catheter ablation (RFCA). We assessed the impact of direct catheter force measurement on acute procedural parameters during RFCA of atrial fibrillation (AF). Fifty consecutive patients (28 male) with paroxysmal AF who underwent their first procedure of circumferential pulmonary vein (PV) isolation (PVI) were assigned to either RFCA using (1) a standard 3.5-mm open-irrigated-tip catheter or (2) a catheter with contact force measurement capabilities. Using the endpoint of PVI with entry and exit block, acute procedural parameters were assessed. Procedural data showed a remarkable decline in ablation time (radiofrequency time needed for PVI) from 50.5 ± 15.9 to 39.0 ± 11.0 minutes (P = 0.007) with a reduction in overall procedure duration from 185 ± 46 to 154 ± 39 minutes (P = 0.022). In parallel, the total energy delivered could be significantly reduced from 70,926 ± 19,470 to 58,511 ± 14,655 Ws (P = 0.019). The number of acute PV reconnections declined from 36% to 12% (P = 0.095). The use of contact force sensing technology is able to significantly reduce ablation and procedure times in PVI. In addition, energy delivery is substantially reduced by avoiding radiofrequency ablation in positions with insufficient surface contact. Procedural efficacy and safety of this new feature have to be evaluated in larger cohorts. ©2012, The Authors. Journal compilation ©2012 Wiley Periodicals, Inc.
Multi-criteria evaluation methods in the production scheduling
NASA Astrophysics Data System (ADS)
Kalinowski, K.; Krenczyk, D.; Paprocka, I.; Kempa, W.; Grabowik, C.
2016-08-01
The paper presents a discussion on the practical application of different methods of multi-criteria evaluation in the process of scheduling in manufacturing systems. Among the methods two main groups are specified: methods based on the distance function (using metacriterion) and methods that create a Pareto set of possible solutions. The basic criteria used for scheduling were also described. The overall procedure of evaluation process in production scheduling was presented. It takes into account the actions in the whole scheduling process and human decision maker (HDM) participation. The specified HDM decisions are related to creating and editing a set of evaluation criteria, selection of multi-criteria evaluation method, interaction in the searching process, using informal criteria and making final changes in the schedule for implementation. According to need, process scheduling may be completely or partially automated. Full automatization is possible in case of metacriterion based objective function and if Pareto set is selected - the final decision has to be done by HDM.
Lusby, Richard Martin; Schwierz, Martin; Range, Troels Martin; Larsen, Jesper
2016-11-01
The aim of this paper is to provide an improved method for solving the so-called dynamic patient admission scheduling (DPAS) problem. This is a complex scheduling problem that involves assigning a set of patients to hospital beds over a given time horizon in such a way that several quality measures reflecting patient comfort and treatment efficiency are maximized. Consideration must be given to uncertainty in the length of stays of patients as well as the possibility of emergency patients. We develop an adaptive large neighborhood search (ALNS) procedure to solve the problem. This procedure utilizes a Simulated Annealing framework. We thoroughly test the performance of the proposed ALNS approach on a set of 450 publicly available problem instances. A comparison with the current state-of-the-art indicates that the proposed methodology provides solutions that are of comparable quality for small and medium sized instances (up to 1000 patients); the two approaches provide solutions that differ in quality by approximately 1% on average. The ALNS procedure does, however, provide solutions in a much shorter time frame. On larger instances (between 1000-4000 patients) the improvement in solution quality by the ALNS procedure is substantial, approximately 3-14% on average, and as much as 22% on a single instance. The time taken to find such results is, however, in the worst case, a factor 12 longer on average than the time limit which is granted to the current state-of-the-art. The proposed ALNS procedure is an efficient and flexible method for solving the DPAS problem. Copyright © 2016 Elsevier B.V. All rights reserved.
Laursen, Thomas Munk; Munk-Olsen, Trine; Agerbo, Esben; Gasse, Christiane; Mortensen, Preben Bo
2009-07-01
Excess mortality from heart disease is observed in patients with severe mental disorder. This excess mortality may be rooted in adverse effects of pharmacological or psychotropic treatment, lifestyle factors, or inadequate somatic care. To examine whether persons with severe mental disorder, defined as persons admitted to a psychiatric hospital with bipolar affective disorder, schizoaffective disorder, or schizophrenia, are in contact with hospitals and undergoing invasive procedures for heart disease to the same degree as the nonpsychiatric general population, and to determine whether they have higher mortality rates of heart disease. A population-based cohort of 4.6 million persons born in Denmark was followed up from 1994 to 2007. Rates of mortality, somatic contacts, and invasive procedures were estimated by survival analysis. Incidence rate ratios of heart disease admissions and heart disease mortality as well as probability of invasive cardiac procedures. The incidence rate ratio of heart disease contacts in persons with severe mental disorder compared with the rate for the nonpsychiatric general population was only slightly increased, at 1.11 (95% confidence interval, 1.08-1.14). In contrast, their excess mortality rate ratio from heart disease was 2.90 (95% confidence interval, 2.71-3.10). Five years after the first contact for somatic heart disease, the risk of dying of heart disease was 8.26% for persons with severe mental disorder (aged <70 years) but only 2.86% in patients with heart disease who had never been admitted to a psychiatric hospital. The fraction undergoing invasive procedures within 5 years was reduced among patients with severe mental disorder as compared with the nonpsychiatric general population (7.04% vs 12.27%, respectively). Individuals with severe mental disorder had only negligible excess rates of contact for heart disease. Given their excess mortality from heart disease and lower rates of invasive procedures after first contact, it would seem that the treatment for heart disease offered to these individuals in Denmark is neither sufficiently efficient nor sufficiently intensive. This undertreatment may explain part of their excess mortality.
Convoy projects: a case study from Germany
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gruener, W.
The Convoy concept was formulated at a time when Kraftwerk Union (KWU) anticipated the start of five to six turnkey nuclear power plant projects within a very short time frame, related to as many customers, sites, and licensing authorities. To counteract the rapidly escalating costs and schedules of projects then under construction, a series of measures were enacted with the purpose of streamlining and optimizing the work procedures both within the company and in relation with the external partners - customers, licensing authorities and their technical advisors, suppliers, and subsuppliers. The organizational framework and the various tools deployed by themore » turnkey contractor ensured smooth and effective design and construction procedures. The adherence to the original budget and schedule is truly remarkable, encouraging further investigation into the applicability of such methods and procedures for future projects.« less
A Hybrid Procedural/Deductive Executive for Autonomous Spacecraft
NASA Technical Reports Server (NTRS)
Pell, Barney; Gamble, Edward B.; Gat, Erann; Kessing, Ron; Kurien, James; Millar, William; Nayak, P. Pandurang; Plaunt, Christian; Williams, Brian C.; Lau, Sonie (Technical Monitor)
1998-01-01
The New Millennium Remote Agent (NMRA) will be the first AI system to control an actual spacecraft. The spacecraft domain places a strong premium on autonomy and requires dynamic recoveries and robust concurrent execution, all in the presence of tight real-time deadlines, changing goals, scarce resource constraints, and a wide variety of possible failures. To achieve this level of execution robustness, we have integrated a procedural executive based on generic procedures with a deductive model-based executive. A procedural executive provides sophisticated control constructs such as loops, parallel activity, locks, and synchronization which are used for robust schedule execution, hierarchical task decomposition, and routine configuration management. A deductive executive provides algorithms for sophisticated state inference and optimal failure recover), planning. The integrated executive enables designers to code knowledge via a combination of procedures and declarative models, yielding a rich modeling capability suitable to the challenges of real spacecraft control. The interface between the two executives ensures both that recovery sequences are smoothly merged into high-level schedule execution and that a high degree of reactivity is retained to effectively handle additional failures during recovery.
TDRS-M Sign Photos: T-4 Days Until Launch
2017-08-14
A sign just inside the gate to NASA's Kennedy Space Center in Florida notes that in four days an Atlas V rocket is scheduled to launch the agency's Tracking and Data Relay Satellite (TDRS-M). Liftoff atop the Unite Launch Alliance Atlas V rocket is scheduled to take place from Cape Canaveral's Space Launch Complex 41 on Aug. 18, 2017. TDRS-M will be the latest spacecraft destined for the agency's constellation of communications satellites that allows nearly continuous contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories.
Ibias, Javier; Pellón, Ricardo
2011-09-30
Eight Spontaneously Hypertensive Rat (SHR), 8 Wistar-Kyoto (WKY) and 8 Wistar rats, all male, maintained at 80-85% of their free-feeding weight by controlled access to food, were exposed to a series of fixed time (FT) schedules whereby food pellets were regularly delivered regardless of the animals' behaviour. The FT values used were 9, 15, 30, 60, 120 and 180 s, with the order of presentation of the schedules among the animals being counterbalanced (except under the FT 120-s and 180-s schedules, which were successively presented as the last two of the series). Due to freely available access to water, the animals developed schedule-induced drinking under all FT schedules, marked by the characteristic bitonic function that relates the number of licks and amount of water drunk to the length of the inter-food interval. Wistar and WKY rats displayed maximum drinking under an FT 15-s schedule, with WKY rats registering lower quantities across all FT values. Among SHR rats, maximum schedule-induced polydipsia was observed under the FT 30-s schedule, with a rightward shift in the bitonic function compared to controls. For long FT values, the temporal distribution of licks within inter-food intervals was shifted slightly towards the right in the SHR rats. In a subsequent study, only the SHR and Wistar rats were used, and the animals were exposed to a delay-discounting procedure. The rats were faced with successive choices, in which they could choose between an immediate reward of one food pellet and another of four food pellets at a delay of 3, 6, 12 or 24s. In the case of the longer delays, SHR rats chose the immediate reward of lower magnitude more often than did their Wistar counterparts, and also committed a greater number of omissions during the forced-choice trials of the procedure. The results indicate that differences in schedule-induced polydipsia are related to indexes of cognitive rather than motor impulsivity, a finding in line with the theoretical idea that adjunctive behaviour is linked to operant reinforcement processes. Copyright © 2011 Elsevier B.V. All rights reserved.
77 FR 12175 - Airworthiness Directives; DASSAULT AVIATION Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... specified products. The MCAI states: The Maintenance Procedure (MP) 57-607, related to non destructive check... Recommended Maintenance Schedules chapter of the Aircraft Maintenance Documentation. After the implementation... maintenance program to include ``Non-Destructive Check of Flap Tracks 2 and 5,'' Maintenance Procedure 57-607...
DOT National Transportation Integrated Search
2008-10-01
This research effort sought to develop statistically justifiable means for developing a : schedule of liquidated damage (LD) rates to be adopted by the Alabama Department of : Transportation (ALDOT). The procedure outlined is to be used to review and...
5 CFR 1302.6 - Schedule of fees.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Administrative Personnel OFFICE OF MANAGEMENT AND BUDGET ADMINISTRATIVE PROCEDURES PRIVACY ACT PROCEDURES § 1302... and mailed or delivered to the Assistant to the Director for Administration, Office of Management and Budget, Washington, DC 20503. (5) A receipt for fees paid will be given upon request. ...
49 CFR 1111.2 - Amended and supplemental complaints.
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE COMPLAINT AND INVESTIGATION PROCEDURES... evidence to opt for a different rate reasonableness methodology, among Three-Benchmark, Simplified-SAC or Full-SAC. If so amended, the procedural schedule begins again under the new methodology as set forth at...
DOT National Transportation Integrated Search
2001-12-01
The decision to use public transit as a means of alternative transportation is a somewhat complex process. The potential rider must know that a public transportation system is available, how to contact the public transportation system for information...
75 FR 41577 - VBA/VHA Musculoskeletal Forum: Improving VA's Disability Evaluation Criteria
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-16
... medical science information from presentations made by subject matter experts. VA plans to use this information to update the sections of VA's Schedule for Rating Disabilities (VASRD) that pertain to diseases... FURTHER INFORMATION CONTACT: Mr. Brad Tuttle, VASRD Coordinator, Compensation and Pension Service...
Project Shuttle simulation math model coordination catalog, revision 1
NASA Technical Reports Server (NTRS)
1974-01-01
A catalog is presented of subsystem and environment math models used or planned for space shuttle simulations. The purpose is to facilitate sharing of similar math models between shuttle simulations. It provides information on mach model requirements, formulations, schedules, and contact persons for further information.
Travel Information Questionnaire Vistor Support Questionaire Telescope Schedules Astronomer's Tools Contact Acknowledgments TS4 History ISPI ISPI Exposure Time Calculator OSIRIS Spartan Optical Imagers accuracy of 3.8% in the image size. Exposure time: the error caused by the finite exposure time is
78 FR 40780 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-08
... what, if any, matters have been added, deleted or postponed, please contact the Office of the Secretary... Closed Meeting. Certain staff members who have an interest in the matters also may be present. The...) and (10), permit consideration of the scheduled matters at the Closed Meeting. Commissioner Gallagher...
77 FR 71845 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-04
... ascertain what, if any, matters have been added, deleted or postponed, please contact: The Office of the... Meeting. Certain staff members who have an interest in the matters also may be present. The General...) and (10), permit consideration of the scheduled matters at the Closed Meeting. Commissioner Gallagher...
78 FR 48690 - Anti-Infective Drugs Advisory Committee; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-09
...., for the proposed indication of treatment of patients with visceral (involving internal organs... registrants requesting to speak is greater than can be reasonably accommodated during the scheduled open... hearing session. The contact person will notify interested persons regarding their request to speak by...
76 FR 28784 - HIT Policy Committee's Workgroup Meetings; Notice of Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-18
...: Meaningful Use, Privacy & Security Tiger Team, Quality Measures, Governance, Adoption/Certification, and... with the Federal Health IT Strategic Plan and that includes recommendations on the areas in which... information or revised schedules as it becomes available. Contact Person: Judy Sparrow, Office of the National...
76 FR 14974 - HIT Policy Committee's Workgroup Meetings; Notice of Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-18
...: Meaningful Use, Privacy & Security Tiger Team, Enrollment, Governance, Adoption/ Certification, PCAST Report... consistent with the Federal Health IT Strategic Plan and that includes recommendations on the areas in which... schedules as it becomes available. Contact Person: Judy Sparrow, Office of the National Coordinator, HHS...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-19
... Team, Enrollment, Governance, Adoption/ Certification, and Information Exchange workgroups. General... the electronic exchange and use of health information as is consistent with the Federal Health IT... site for additional information or revised schedules as it becomes available. Contact Person: Judy...
Benefits of Synchronous Online Courses
ERIC Educational Resources Information Center
Moser, Scott; Smith, Phil
2015-01-01
Most online courses are offered as "asynchronous" courses and have no real-time contact with students. The Synchronous online alternative provides normal scheduled class time and allows students to login to a virtual online classroom with the instructor. We provide an overview of two different platforms for hosting synchronous classes…
TES Instrument Decommissioning
Atmospheric Science Data Center
2018-03-20
TES Instrument Decommissioning Tuesday, March 20, 2018 ... PST during a scheduled real time satellite contact the TES IOT along with the Aura FOT commanded the TES instrument to its ... generated from an algorithm update to the base Ground Data System software and will be made available to the scientific community in the ...
Drop shape visualization and contact angle measurement on curved surfaces.
Guilizzoni, Manfredo
2011-12-01
The shape and contact angles of drops on curved surfaces is experimentally investigated. Image processing, spline fitting and numerical integration are used to extract the drop contour in a number of cross-sections. The three-dimensional surfaces which describe the surface-air and drop-air interfaces can be visualized and a simple procedure to determine the equilibrium contact angle starting from measurements on curved surfaces is proposed. Contact angles on flat surfaces serve as a reference term and a procedure to measure them is proposed. Such procedure is not as accurate as the axisymmetric drop shape analysis algorithms, but it has the advantage of requiring only a side view of the drop-surface couple and no further information. It can therefore be used also for fluids with unknown surface tension and there is no need to measure the drop volume. Examples of application of the proposed techniques for distilled water drops on gemstones confirm that they can be useful for drop shape analysis and contact angle measurement on three-dimensional sculptured surfaces. Copyright © 2011 Elsevier Inc. All rights reserved.
Smallman, Bettina; Dexter, Franklin
2010-03-01
Research in predictive variability of operating room (OR) times has been performed using data from multidisciplinary, tertiary hospitals with mostly adult patients. In this article, we discuss case-duration prediction for children receiving general anesthesia for endoscopy. We critique which of the several types of OR management decisions dependent on accuracy of prediction are relevant to series (lists) of brief pediatric anesthetics. OR information system data were obtained for all children (aged 18 years and younger) undergoing a gastroenterology procedure with an anesthesiologist over 21 months. Summaries of data were used for a qualitative, systematic review of prior studies to learn which apply to brief pediatric cases. Patient arrival times were changed to be based on the statistical method relating actual and scheduled start times (Wachtel and Dexter, Anesth Analg 2007;105:127-40). Even perfect case-duration prediction would not affect whether a brief case was performed on a certain date and/or in a certain OR. There was no evidence of usefulness in calculating the probability that one case would last longer than another or in resequencing cases to influence postanesthesia care unit staffing or patient waiting from scheduled start times. The only decision for which the accuracy of case-duration prediction mattered was for the shortest time that preceding cases in the OR may take. Knowledge of the preceding procedures in the OR was not useful for that purpose because there were hundreds of combinations of preceding procedures and some cases cancelled. Instead, patient ready times were chosen based on 5% lower prediction bounds for ratios of actual to scheduled OR times. The approach was useful based on a 30% reduction in patient waiting times from scheduled start times with corresponding expected reductions in average and peak numbers of patients in the holding area. For brief pediatric OR anesthetics, predictive variability of case durations matters principally to the extent that it affects appropriate patient ready times. Such times should not be chosen by having patients start fasting, arrive, and be ready fixed numbers of hours before their scheduled start times.
Code of Federal Regulations, 2012 CFR
2012-04-01
... TREASURY (CONTINUED) PROCEDURES AND PRACTICES PROCEDURE AND ADMINISTRATION Procedural Rules Relating to... the Bureau of Alcohol, Tobacco, Firearms and Explosives (Department of Justice), contact the Bureau of...
Code of Federal Regulations, 2014 CFR
2014-04-01
... TREASURY (CONTINUED) PROCEDURES AND PRACTICES PROCEDURE AND ADMINISTRATION Procedural Rules Relating to... the Bureau of Alcohol, Tobacco, Firearms and Explosives (Department of Justice), contact the Bureau of...
Code of Federal Regulations, 2013 CFR
2013-04-01
... TREASURY (CONTINUED) PROCEDURES AND PRACTICES PROCEDURE AND ADMINISTRATION Procedural Rules Relating to... the Bureau of Alcohol, Tobacco, Firearms and Explosives (Department of Justice), contact the Bureau of...
Code of Federal Regulations, 2011 CFR
2011-04-01
... TREASURY (CONTINUED) PROCEDURES AND PRACTICES PROCEDURE AND ADMINISTRATION Procedural Rules Relating to... the Bureau of Alcohol, Tobacco, Firearms and Explosives (Department of Justice), contact the Bureau of...
ERIC Educational Resources Information Center
Ta, Wei-Min; Pitts, Raymond C.; Hughes, Christine E.; McLean, Anthony P.; Grace, Randolph C.
2008-01-01
The purpose of this study was to examine effects of "d"-amphetamine on choice controlled by reinforcement delay. Eight pigeons responded under a concurrent-chains procedure in which one terminal-link schedule was always fixed- interval 8 s, and the other terminal-link schedule changed from session to session between fixed-interval 4 s and…
Benchmarking GNU Radio Kernels and Multi-Processor Scheduling
2013-01-14
AMD E350 APU , comparable to Atom • ARM Cortex A8 running on a Gumstix Overo on an Ettus USRP E110 The general testing procedure consists of • Build...Intel Atom, and the AMD E350 APU . 3.2 Multi-Processor Scheduling Figure 1: GFLOPs per second through an FFT array on an Intel i7. Example output from
GSFC Technology Development Center Report
NASA Technical Reports Server (NTRS)
Himwich, Ed; Gipson, John
2013-01-01
This report summarizes the activities of the GSFC Technology Development Center (TDC) for 2012 and forecasts planned activities for 2013. The GSFC TDC develops station software including the Field System (FS), scheduling software (SKED), hardware including tools for station timing and meteorology, scheduling algorithms, and operational procedures. It provides a pool of individuals to assist with station implementation, check-out, upgrades, and training.
40 CFR 86.164-08 - Supplemental Federal Test Procedure calculations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... for the test schedules of FTP, US06, and SC03. (b) The provisions of § 86.144-94(a) are applicable to... the FTP test schedule (Ywm). (c)(1) When the test vehicle is equipped with air conditioning, the final... = Mass emissions per mile for a particular pollutant weighted in terms of the contributions from the FTP...
ERIC Educational Resources Information Center
Hockey, G. Robert J.; Earle, Fiona
2006-01-01
Two experiments tested the hypothesis that task-induced mental fatigue is moderated by control over work scheduling. Participants worked for 2 hr on simulated office work, with control manipulated by a yoking procedure. Matched participants were assigned to conditions of either high control (HC) or low control (LC). HC participants decided their…
Design and Stress Analysis of Low-Noise Adjusted Bearing Contact Spiral Bevel Gears
NASA Technical Reports Server (NTRS)
Fuentes, A.; Litvin, F. L.; Mullins, B. R.; Woods, R.; Handschuh, R. F.; Lewicki, David G.
2002-01-01
An integrated computerized approach for design and stress analysis of low-noise spiral bevel gear drives with adjusted bearing contact is proposed. The procedure of computations is an iterative process that requires four separate procedures and provide: (a) a parabolic function of transmission errors that is able to reduce the effect of errors of alignment on noise and vibration, and (b) reduction of the shift of bearing contact caused by misalignment. Application of finite element analysis enables us to determine the contact and bending stresses and investigate the formation of the bearing contact. The design of finite element models and boundary conditions is automated and does not require intermediate CAD computer programs for application of general purpose computer program for finite element analysis.
Solution procedure of dynamical contact problems with friction
NASA Astrophysics Data System (ADS)
Abdelhakim, Lotfi
2017-07-01
Dynamical contact is one of the common research topics because of its wide applications in the engineering field. The main goal of this work is to develop a time-stepping algorithm for dynamic contact problems. We propose a finite element approach for elastodynamics contact problems [1]. Sticking, sliding and frictional contact can be taken into account. Lagrange multipliers are used to enforce non-penetration condition. For the time discretization, we propose a scheme equivalent to the explicit Newmark scheme. Each time step requires solving a nonlinear problem similar to a static friction problem. The nonlinearity of the system of equation needs an iterative solution procedure based on Uzawa's algorithm [2][3]. The applicability of the algorithm is illustrated by selected sample numerical solutions to static and dynamic contact problems. Results obtained with the model have been compared and verified with results from an independent numerical method.
Arias, Carlos; Spear, Norman E; Molina, Juan Carlos; Molina, Agustin; Molina, Juan Carlos
2007-09-01
Newborn rats are capable of obtaining milk by attaching to a surrogate nipple. During this procedure pups show a gradual increase in head and forelimb movements oriented towards the artificial device that are similar to those observed during nipple attachment. In the present study the probability of execution of these behaviors was analyzed as a function of their contingency with intraoral milk infusion using brief training procedures (15 min). Five-day-old pups were positioned in a smooth surface having access to a touch-sensitive sensor. Physical contact with the sensor activated an infusion pump which served to deliver intraoral milk reinforcement (Paired group). Yoked controls received the reinforcer when Paired neonates touched the sensor. Paired pups trained under a continuous reinforcement schedule emitted significantly more responses than Yoked controls following two (Experiment 1) or one training session (Experiment 2). These differences were also observed during an extinction session conducted immediately after training. The level of maternal deprivation before training (3 or 6 hr) or the volume of milk delivered (1.0 or 1.5 microl per pulse) did not affect acquisition or extinction performances. In addition, it was observed that the rate of responding of Paired pups during the early phase of the extinction session significantly predicted subsequent levels of acceptance of the reinforcer. These results indicate that the frequency of suckling-related behaviors can be rapidly modified by means of associative operant processes. The operant procedure here described represents an alternative tool for the ontogenetic analysis of self-administration or behavior processes of seeking. .
Behavioral regulation of gravity - Schedule effects under escape-avoidance procedures
NASA Technical Reports Server (NTRS)
Clark, F. C.; Lange, K. O.; Belleville, R. E.
1973-01-01
Squirrel monkeys were restrained in a centrifuge capsule and trained to escape and avoid increases in artificial gravity. During escape-avoidance, lever responses reduced centrifugally simulated gravity or postponed scheduled increases. The effect of variation in the interval of postponement (equal to the duration of decrease produced by escape responses) was studied under a multiple schedule of four components. Three components were gravity escape-avoidance with postponement times of 20, 40, and 60 sec. The fourth component was extinction. Each component was associated with a different auditory stimulus. Rate of responding decreased with increasing postponement time and higher mean g-levels occurred at shorter intervals of postponement. Effects of the schedule parameter on response rate and mean g-level were similar to effects of the schedule on free-operant avoidance and on titration behavior maintained by shock.
23 CFR 1340.7 - Observation procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OBSERVATIONAL SURVEYS OF SEAT BELT USE Survey Design Requirements § 1340.7 Observation procedures. (a) Data collection dates. All survey data shall be collected through direct observation completely within the...), the survey shall be conducted in accordance to the schedule determined in § 1340.6. (b) Roadway and...
23 CFR 1340.7 - Observation procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OBSERVATIONAL SURVEYS OF SEAT BELT USE Survey Design Requirements § 1340.7 Observation procedures. (a) Data collection dates. All survey data shall be collected through direct observation completely within the...), the survey shall be conducted in accordance to the schedule determined in § 1340.6. (b) Roadway and...
23 CFR 1340.7 - Observation procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OBSERVATIONAL SURVEYS OF SEAT BELT USE Survey Design Requirements § 1340.7 Observation procedures. (a) Data collection dates. All survey data shall be collected through direct observation completely within the...), the survey shall be conducted in accordance to the schedule determined in § 1340.6. (b) Roadway and...
40 CFR 1066.410 - Dynamometer test procedure.
Code of Federal Regulations, 2014 CFR
2014-07-01
... drive mode. (For purposes of this paragraph (g), the term four-wheel drive includes other multiple drive... Dynamometer test procedure. (a) Dynamometer testing may consist of multiple drive cycles with both cold-start...-setting part identifies the driving schedules and the associated sample intervals, soak periods, engine...
CTEPP STANDARD OPERATING PROCEDURE FOR OBTAINING INFORMED CONSENT (SOP-1.13)
The CTEPP informed consent procedures are described in the SOP. After an eligible subject provides verbal consent, staff schedule a visit to meet with the subject in person to explain study activities and answer questions about the study. During the visit, staff demonstrate how...
49 CFR 1572.21 - Procedures for TWIC security threat assessment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... conducts includes a fingerprint-based criminal history records check (CHRC), an intelligence-related check, and a final disposition. (b) Fingerprint-based check. The following procedures must be completed to conduct a fingerprint-based CHRC: (1) Consistent with the implementation schedule described in 49 CFR 1572...
49 CFR 1572.21 - Procedures for TWIC security threat assessment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... conducts includes a fingerprint-based criminal history records check (CHRC), an intelligence-related check, and a final disposition. (b) Fingerprint-based check. The following procedures must be completed to conduct a fingerprint-based CHRC: (1) Consistent with the implementation schedule described in 49 CFR 1572...
49 CFR 1572.21 - Procedures for TWIC security threat assessment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... conducts includes a fingerprint-based criminal history records check (CHRC), an intelligence-related check, and a final disposition. (b) Fingerprint-based check. The following procedures must be completed to conduct a fingerprint-based CHRC: (1) Consistent with the implementation schedule described in 49 CFR 1572...
49 CFR 1572.21 - Procedures for TWIC security threat assessment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... conducts includes a fingerprint-based criminal history records check (CHRC), an intelligence-related check, and a final disposition. (b) Fingerprint-based check. The following procedures must be completed to conduct a fingerprint-based CHRC: (1) Consistent with the implementation schedule described in 49 CFR 1572...
49 CFR 1572.21 - Procedures for TWIC security threat assessment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... conducts includes a fingerprint-based criminal history records check (CHRC), an intelligence-related check, and a final disposition. (b) Fingerprint-based check. The following procedures must be completed to conduct a fingerprint-based CHRC: (1) Consistent with the implementation schedule described in 49 CFR 1572...
Contact angle determination procedure and detection of an invisible surface film
NASA Technical Reports Server (NTRS)
Meyer, G.; Grat, R.
1990-01-01
The contact angle value, i.e., the tangent angle of liquid resting on a planar solid surface, is a basic parameter which can be applied to a wide range of applications. The goal is to provide a basic understanding of the contact angle measurement technique and to present a simple illustration that can be applied as a quality control method; namely, detection of a surface contaminant which exists on a surface that appears clean to the unaided eye. The equipment and experimental procedures are detailed.
Use of SMS text messaging to improve outpatient attendance.
Downer, Sean R; Meara, John G; Da Costa, Annette C
2005-10-03
To evaluate the effect of appointment reminders sent as short message service (SMS) text messages to patients' mobile telephones on attendance at outpatient clinics. Cohort study with historical control. Royal Children's Hospital, Melbourne, Victoria. Patients who gave a mobile telephone contact number and were scheduled to attend any of five outpatient clinics (dermatology, gastroenterology, general medicine, paediatric dentistry and plastic surgery) in September (trial group) or August (control group), 2004. Failure to attend (FTA) rate compared between the group sent a reminder and those who were not. 2151 patients were scheduled to attend a clinic in September; 1382 of these (64.2%) gave a mobile telephone contact number and were sent an SMS reminder (trial group). Corresponding numbers in the control group were 2276 scheduled to attend and 1482 (65.1%) who gave a mobile telephone number. The FTA rate for individual clinics was 12%-16% for the trial group, and 19%-39% for the control group. Overall FTA rate was significantly lower in the trial group than in the control group (14.2% v 23.4%; P < 0.001). The observed reduction in failure to attend rate was in line with that found using traditional reminder methods. The ease with which large numbers of messages can be customised and sent by SMS text messaging, along with its availability and comparatively low cost, suggest it may be a suitable means of improving patient attendance.
Nonentrained circadian rhythms of melatonin in submariners scheduled to an 18-hour day.
Kelly, T L; Neri, D F; Grill, J T; Ryman, D; Hunt, P D; Dijk, D J; Shanahan, T L; Czeisler, C A
1999-06-01
The human circadian timing system has previously been shown to free run with a period slightly longer than 24 h in subjects living in the laboratory under conditions of forced desynchrony. In forced desynchrony, subjects are shielded from bright light and periodic time cues and are required to live on a day length outside the range of circadian entrainment. The work schedule used for most personnel aboard American submarines is 6 h on duty alternating with 12 h off duty. This imposed 18-h cycle is too short for human circadian synchronization, especially given that there is no bright-light exposure aboard submarines. However, crew members are exposed to 24-h stimuli that could mediate synchronization, such as clocks and social contacts with personnel who are living on a 24-h schedule. The authors investigated circadian rhythms of salivary melatonin in 20 crew members during a prolonged voyage on a Trident nuclear submarine. The authors found that in crew members living on the 18-h duty cycle, the endogenous rhythm of melatonin showed an average period of 24.35 h (n = 12, SD = 0.18 h). These data indicate that social contacts and knowledge of clock time are insufficient for entrainment to a 24-h period in personnel living by an 18-h rest-activity cycle aboard a submarine.
New York area and worldwide: call-in radio program on HIV.
1999-07-16
Treatment activist Jules Levin, founder of the National AIDS Treatment Advocacy Group, has begun a weekly radio program called "Living Well with HIV". Listeners can call in with questions for experts featured on the show. Programs on hepatitis and AIDS have already been scheduled. Contact information is provided.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Requisitioning tabulating... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT... electrical and mechanical contact tabulating machines, including aperture cards and copy cards. Federal...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requisitioning tabulating... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT... electrical and mechanical contact tabulating machines, including aperture cards and copy cards. Federal...
21 CFR 1306.13 - Partial filling of prescriptions.
Code of Federal Regulations, 2013 CFR
2013-04-01
... prescription for a controlled substance listed in Schedule II is permissible if the pharmacist is unable to... or cannot be filled within the 72-hour period, the pharmacist shall notify the prescribing individual... as having a terminal illness, the pharmacist must contact the practitioner prior to partially filling...
21 CFR 1306.13 - Partial filling of prescriptions.
Code of Federal Regulations, 2014 CFR
2014-04-01
... prescription for a controlled substance listed in Schedule II is permissible if the pharmacist is unable to... or cannot be filled within the 72-hour period, the pharmacist shall notify the prescribing individual... as having a terminal illness, the pharmacist must contact the practitioner prior to partially filling...
21 CFR 1306.13 - Partial filling of prescriptions.
Code of Federal Regulations, 2012 CFR
2012-04-01
... prescription for a controlled substance listed in Schedule II is permissible if the pharmacist is unable to... or cannot be filled within the 72-hour period, the pharmacist shall notify the prescribing individual... as having a terminal illness, the pharmacist must contact the practitioner prior to partially filling...
21 CFR 1306.13 - Partial filling of prescriptions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... prescription for a controlled substance listed in Schedule II is permissible if the pharmacist is unable to... or cannot be filled within the 72-hour period, the pharmacist shall notify the prescribing individual... as having a terminal illness, the pharmacist must contact the practitioner prior to partially filling...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
... Regional Office's normal hours of operation. The Regional Office's official hours of business are Monday... personal information provided, unless the comment includes information claimed to be Confidential Business... INFORMATION CONTACT section to schedule your inspection. The Regional Office's official hours of business are...
77 FR 53935 - Sunshine Act Cancellation Notice-OPIC's September 6, 2012 Annual Public Hearing
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-04
... OVERSEAS PRIVATE INVESTMENT CORPORATION Sunshine Act Cancellation Notice--OPIC's September 6, 2012 Annual Public Hearing OPIC's Sunshine Act notice of its Annual Public Hearing was published in the... scheduled for 2 p.m., September 6, 2012 has been cancelled. CONTACT PERSON FOR INFORMATION: Information on...
75 FR 65497 - Science Board Advisory Committee; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-25
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-N-0001... for Food Safety and Applied Nutrition (CFSAN) will present its evaluation and review of the final... contact person on or before Monday, November 8, 2010. Oral presentations from the public will be scheduled...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-21
... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-1104 (Review)] Polyester Staple Fiber... Polyester Staple Fiber From China AGENCY: United States International Trade Commission. ACTION: Notice... CONTACT: Joanna Lo (202-205-1888), Office of Investigations, U.S. International Trade Commission, 500 E...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-28
... INTERNATIONAL TRADE COMMISSION [Investigation Nos. 701-TA-509 and 731-TA-1244 (Preliminary)] 1,1,1... and Scheduling of Preliminary Phase Investigations AGENCY: United States International Trade... CONTACT: Chris Cassise (202-708-5408), Office of Investigations, U.S. International Trade Commission, 500...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-06
... comment includes Confidential Business Information (CBI) or other information whose disclosure is... the hard copy materials, please schedule an appointment during normal business hours with the contact... compounds with a global warming potential (GWP) of 150 or greater in Multi-purpose Solvents and Paint...
Translations on USSR Resources No. 830
1978-10-06
duction of the automated control system must be continued. A second strand of the Shatlyk -Ashkhabad-Bezmein gas pipeline is to be built to increase the...schedule to Northern Tyumenskaya Oblast, to the Orenburg and Shatlyk fields. "We are in constant contact with our clients," says the plant’s deputy
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-21
...; Email [email protected]ars.usda.gov . SUPPLEMENTARY INFORMATION: The next meeting of the AC21 has been scheduled for... register by contacting Ms. Dianne Fowler at (202) 720-4074 or by Email at [email protected]ars.usda.gov at...
78 FR 42125 - Sunshine Act Meeting.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-15
... what, if any, matters have been added, deleted or postponed, please contact the Office of the Secretary... Item. The following matter will also be considered during the 4:00 p.m. Closed Meeting scheduled for Wednesday July 10, 2013: a personnel matter. The General Counsel of the Commission, or her designee, has...
78 FR 69463 - Notice of Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-19
... information and to ascertain what, if any, matters have been added, deleted or postponed, please contact the... Closed Meeting. Certain staff members who have an interest in the matters also may be present. The...) and (10), permit consideration of the scheduled matter at the Closed Meeting. Commissioner Stein, as...
78 FR 36279 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-17
... information and to ascertain what, if any, matters have been added, deleted or postponed, please contact the...: Additional Item. The following matter will also be considered during the 2:00 p.m. Closed Meeting scheduled for Thursday, June 13, 2013: a personnel matter. The General Counsel of the Commission, or her...
77 FR 71203 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-29
... information and to ascertain what, if any, matters have been added, deleted or postponed, please contact the... Commissioners, the Secretary to the Commission, and certain staff members who have an interest in the matter... CFR 200.402(a)(2) and (6), permit consideration of the scheduled matter at the Closed Meeting...
77 FR 28642 - Sunshine Act Meeting Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
... information and to ascertain what, if any, matters have been added, deleted or postponed, please contact the... scheduled matters at the Closed Meeting. Certain staff members who have an interest in the matters also may... Meeting in closed session, and determined that no earlier notice thereof was possible. The subject matter...
78 FR 14377 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-05
... information and to ascertain what, if any, matters have been added, deleted or postponed, please contact the.... Certain staff members who have an interest in the matters also may be present. The General Counsel of the...), permit consideration of the scheduled matters at the Closed Meeting. Commissioner Aguilar, as duty...
77 FR 6160 - Notice of Sunshine Act Meeting.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-07
... what, if any, matters have been added, deleted or postponed, please contact: The Office of the... attend the Closed Meeting. Certain staff members who have an interest in the matters also may be present...)(3), (5), (7), 9(ii) and (10), permit consideration of the scheduled matters at the Closed Meeting...
76 FR 63964 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
... ascertain what, if any, matters have been added, deleted or postponed, please contact: The Office of the.... Certain staff members who have an interest in the matters also may be present. The General Counsel of the...), permit consideration of the scheduled matters at the Closed Meeting. Commissioner Aguilar, as duty...
29 CFR 1404.19 - Arbitration process.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the OAS, the arbitrator must contact the parties within seven (7) calendar days. (b) The parties and the arbitrator must attempt to schedule a hearing within 30 days of the appointment date. (c) Absent mutual agreement, all hearings will be concluded within one day. No transcripts of the proceedings will...
75 FR 60371 - Requirements of a Statement Disclosing Uncertain Tax Positions; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-30
... Requirements of a Statement Disclosing Uncertain Tax Positions; Correction AGENCY: Internal Revenue Service... the IRS to require corporations to file a schedule disclosing uncertain tax positions related to the tax return as required by the IRS. FOR FURTHER INFORMATION CONTACT: Kathryn Zuba, (202) 622-3400 (not...
Advisors, Faculty, and Librarians: Collaborating for Student Success
ERIC Educational Resources Information Center
Guy, Ashley; Eimer, Lisa
2016-01-01
Librarians have continuously struggled with developing quality relationships with faculty and advisors to support students online. In 2014, Rasmussen College introduced a one-stop student support model of service that makes a student's advisor their primary point of contact for library resources, academic support, financial aid, course scheduling,…
ERIC Educational Resources Information Center
Rhode Island Department of Elementary and Secondary Education, 2007
2007-01-01
This handbook will assist principals and school testing coordinators in implementing the spring 2007 administration of the Developmental Reading Assessment (DRA). Information regarding administration timeline, reporting, process, online tools and contact personnel is discussed. Contents include: (1) Scheduling; (2) Identify Primary Test…
76 FR 4646 - Blue Ribbon Commission on America's Nuclear Future
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-26
.... ADDRESSES: Navy Shipyard, 1333 Isaac Hull Avenue, SE., Washington, DC 20376. FOR FURTHER INFORMATION CONTACT... spent nuclear fuel and nuclear waste. The Commission is scheduled to submit a draft report to the..., high-level waste, and materials derived from nuclear activities.'' In support of that effort, the...
76 FR 50735 - HIT Policy Committee's Workgroup Meetings; Notice of Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-16
... Coordinator on a policy framework for the development and adoption of a nationwide health information... with the Federal Health IT Strategic Plan and that includes recommendations on the areas in which... revised schedules as it becomes available. Contact Person: Judy Sparrow, Office of the National...
75 FR 26280 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-11
... the Life Cycle Management Division (NWML) using one of the following means: Mail: NARA (NWML), 8601... indicate in their request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle... period, and balance. 4. Department of Education, Federal Student Aid (N1-441-09-23, 9 items, 9 temporary...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-16
..., unless it displays a currently valid OMB control number. FOR FURTHER INFORMATION CONTACT: Federal Reserve... Y-9C. OMB control number: 7100-0128. Frequency: Quarterly. Reporters: Bank holding companies (BHCs... balance; A new Schedule HC-U, Loan Origination Activity (in Domestic Offices), in which institutions with...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-15
... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 48 CFR Parts 1, 2, 22, and 52 [FAC 2005-64; FAR Case 2011-028; Correction; Docket 2011-028... status or publication schedules, contact the Regulatory Secretariat at 202-501-4755. Please cite FAC 2005...
Innovations in Early Education: The International Reggio Exchange, 2000-2001.
ERIC Educational Resources Information Center
Kaminsky, Judith Allen, Ed.
2001-01-01
This document is comprised of four issues of a quarterly publication presenting information related to the Reggio Emilia approach to early childhood education. Regularly appearing features of the publication include a calendar of Reggio conferences; information on the Reggio Children organization, contacts, exhibit schedule, and study tours; and a…
78 FR 79021 - Sunshine Act Meeting Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0001] Sunshine Act Meeting Notice DATES: Weeks of December... meetings scheduled for the week of December 30, 2013. Week of January 6, 2014--Tentative Monday, January 6... to Dry Casks (Public Meeting) (Contact: Kevin Witt, 301-415-2145). This meeting will be webcast live...
Human's choices in situations of time-based diminishing returns.
Hackenberg, T D; Axtell, S A
1993-01-01
Three experiments examined adult humans' choices in situations with contrasting short-term and long-term consequences. Subjects were given repeated choices between two time-based schedules of points exchangeable for money: a fixed schedule and a progressive schedule that began at 0 s and increased by 5 s with each point delivered by that schedule. Under "reset" conditions, choosing the fixed schedule not only produced a point but it also reset the requirements of the progressive schedule to 0 s. In the first two experiments, reset conditions alternated with "no-reset" conditions, in which progressive-schedule requirements were independent of fixed-schedule choices. Experiment 1 entailed choices between a progressive-interval schedule and a fixed-interval schedule, the duration of which varied across conditions. Switching from the progressive- to the fixed-interval schedule was systematically related to fixed-interval size in 4 of 8 subjects, and in all subjects occurred consistently sooner in the progressive-schedule sequence under reset than under no-reset procedures. The latter result was replicated in a second experiment, in which choices between progressive- and fixed-interval schedules were compared with choices between progressive- and fixed-time schedules. In Experiment 3, switching patterns under reset conditions were unrelated to variations in intertrial interval. In none of the experiments did orderly choice patterns depend on verbal descriptions of the contingencies or on schedule-controlled response patterns in the presence of the chosen schedules. The overall pattern of results indicates control of choices by temporarily remote consequences, and is consistent with versions of optimality theory that address performance in situations of diminishing returns. PMID:8315364
Sankaridurg, P R; Willcox, M D; Sharma, S; Gopinathan, U; Janakiraman, D; Hickson, S; Vuppala, N; Sweeney, D F; Rao, G N; Holden, B A
1996-01-01
Ten episodes of adverse responses to contact lens wear, including contact lens-induced acute red eye (CLARE), in which Haemophilus influenzae was isolated from contact lenses and/or from one of the external ocular sites at the time of the event, are described. All episodes occurred in patients wearing disposable hydrogel lenses on a 6-night extended-wear schedule. Two of the patients had recurrent episodes. H. influenzae was usually isolated in large numbers, and other bacteria or fungi colonizing the contact lens or the external ocular surface were usually present in low numbers. Those patients who were colonized with H. influenzae were more than 100 times as likely to have had a CLARE or infiltrative response than those subjects who were not colonized with this bacterium. H. influenzae colonization of the contact lens and eye may be subsequent to colonization of the nasopharynx because four of the seven patients presented with fever at the time of the event, with concurrent upper respiratory tract infection. Contact lens wearers should be made aware of the potential risk of CLARE associated with the wearing of contact lenses for extended periods during and subsequent to upper respiratory tract infection. PMID:8880493
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ghoudjehbaklou, H.; Puttgen, H.B.
This paper outlines an optimum spot price determination procedure in the general context of the Public Utility Regulatory Policies Act, PURPA, provisions. PURPA stipulates that local utilities must offer to purchase all available excess electric energy from Qualifying Facilities, QF, at fair market prices. As a direct consequence of these PURPA regulations, a growing number of owners are installing power producing facilities and optimize their operational schedules to minimize their utility related costs or, in some cases, actually maximize their revenues from energy sales to the local utility. In turn, the utility strives to use spot prices which maximize itsmore » revenues from any given Small Power Producing Facility, SPPF, a schedule while respecting the general regulatory and contractual framework. the proposed optimum spot price determination procedure fully models the SPPF operation, it enforces the contractual and regulatory restrictions, and it ensures the uniqueness of the optimum SPPF schedule.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ghoudjehbaklou, H.; Puttgen, H.B.
The present paper outlines an optimum spot price determination procedure in the general context of the Public Utility Regulatory Policies Act, PURPA, provisions. PURPA stipulates that local utilities must offer to purchase all available excess electric energy from Qualifying Facilities, QF, at fair market prices. As a direct consequence of these PURPA regulations, a growing number of owners are installing power producing facilities and optimize their operational schedules to minimize their utility related costs or, in some cases, actually maximize their revenues from energy sales to the local utility. In turn, the utility will strive to use spot prices whichmore » maximize its revenues from any given Small Power Producing Facility, SPPF, schedule while respecting the general regulatory and contractual framework. The proposed optimum spot price determination procedure fully models the SPPF operation, it enforces the contractual and regulatory restrictions, and it ensures the uniqueness of the optimum SPPF schedule.« less
A comprehensive and efficient process for counseling patients desiring sterilization.
Haws, J M; Butta, P G; Girvin, S
1997-06-01
To optimize the time spent counseling a sterilization patient, this article presents a 10-step process that includes all steps necessary to ensure a comprehensive counseling session: (1) Discuss current contraception use and all available methods; (2) assess the client's interest in/readiness for sterilization; (3) emphasize that the procedure is meant to be permanent, but there is a possibility of failure; (4) explain the surgical procedure using visuals, and include a discussion of benefits and risks; (5) explain privately to the client the need to use condoms if engaging in risky sexual activity; (6) have the client read and sign an informed consent form; (7) schedule an appointment for the procedure and provide the patient with a copy of all necessary paperwork; (8) discuss cost and payment method; (9) provide written preoperative and postoperative instructions; and (10) schedule a postoperation visit, or a postoperation semen analysis.
NASA Astrophysics Data System (ADS)
Yusriski, R.; Sukoyo; Samadhi, T. M. A. A.; Halim, A. H.
2018-03-01
This research deals with a single machine batch scheduling model considering the influenced of learning, forgetting, and machine deterioration effects. The objective of the model is to minimize total inventory holding cost, and the decision variables are the number of batches (N), batch sizes (Q[i], i = 1, 2, .., N) and the sequence of processing the resulting batches. The parts to be processed are received at the right time and the right quantities, and all completed parts must be delivered at a common due date. We propose a heuristic procedure based on the Lagrange method to solve the problem. The effectiveness of the procedure is evaluated by comparing the resulting solution to the optimal solution obtained from the enumeration procedure using the integer composition technique and shows that the average effectiveness is 94%.
1987-03-16
CAPE CANAVERAL, Fla. -- At Cape Canaveral Air Force Station in Florida, the paylaod fairing of the Delta 182 launch vehicle is carefully moved into place as encapsulation procedures continue on the Palapa B2-P communications satellite at Launch Complex 17, Pad B. Palapa is scheduled for launch from Cape Canaveral for the government of Indonesia. Liftoff of Delta 182 and Palapa is scheduled for March 20. Photo Credit: NASA
12-hour shifts: an ethical dilemma for the nurse executive.
Lorenz, Susan G
2008-06-01
Flexible work hours, including 12-hour shifts, have become a common scheduling option for nurses. The author explores whether 12-hour shifts are an ethical scheduling option for nurses because recent research suggests that 12-hour shifts are a potential hazard to patients. A multistep model for ethical decision making, reflecting the concept of procedural justice, is used to examine this issue.
32 CFR 296.4 - Procedures for request of records.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 2 2010-07-01 2010-07-01 false Procedures for request of records. 296.4 Section 296.4 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED... of the Department of Defense, the applicable published Department rules and schedules with respect to...
32 CFR 296.4 - Procedures for request of records.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 2 2014-07-01 2014-07-01 false Procedures for request of records. 296.4 Section 296.4 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED... of the Department of Defense, the applicable published Department rules and schedules with respect to...
The purpose of this SOP is to provide an overview of field sampling procedures. This SOP details the samples taken, the responsibilities of the field staff, an approximate schedule for field operations, persons responsible for analyses, equipment used for sampling, and contents ...
Investigation of a Reinforcement-Based Toilet Training Procedure for Children with Autism.
ERIC Educational Resources Information Center
Cicero, Frank R.; Pfadt, Al
2002-01-01
This study evaluated the effectiveness of a reinforcement-based toilet training intervention with three children with autism. Procedures included positive reinforcement, graduated guidance, scheduled practice trials, and forward prompting. All three children reduced urination accidents to zero and learned to request bathroom use spontaneously…
14 CFR 302.211 - Procedures in certificate cases involving initial or continuing fitness.
Code of Federal Regulations, 2012 CFR
2012-01-01
... initial or continuing fitness. 302.211 Section 302.211 Aeronautics and Space OFFICE OF THE SECRETARY... Disposition of Applications § 302.211 Procedures in certificate cases involving initial or continuing fitness... applicant's fitness to operate. Where such applications propose the operation of scheduled service in...
14 CFR 302.211 - Procedures in certificate cases involving initial or continuing fitness.
Code of Federal Regulations, 2014 CFR
2014-01-01
... initial or continuing fitness. 302.211 Section 302.211 Aeronautics and Space OFFICE OF THE SECRETARY... Disposition of Applications § 302.211 Procedures in certificate cases involving initial or continuing fitness... applicant's fitness to operate. Where such applications propose the operation of scheduled service in...
14 CFR 302.211 - Procedures in certificate cases involving initial or continuing fitness.
Code of Federal Regulations, 2013 CFR
2013-01-01
... initial or continuing fitness. 302.211 Section 302.211 Aeronautics and Space OFFICE OF THE SECRETARY... Disposition of Applications § 302.211 Procedures in certificate cases involving initial or continuing fitness... applicant's fitness to operate. Where such applications propose the operation of scheduled service in...
47 CFR 1.1121 - Billing procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Schedule of Statutory Charges and... Telecommunications Settlements (§ 1.1103 of this subpart), Accounting and Audits Field Audits and Review of Arrest Audits (§ 1.1106 of this subpart) should not be paid with the filing or submission of the request. The...
14 CFR 302.211 - Procedures in certificate cases involving initial or continuing fitness.
Code of Federal Regulations, 2010 CFR
2010-01-01
... initial or continuing fitness. 302.211 Section 302.211 Aeronautics and Space OFFICE OF THE SECRETARY... Disposition of Applications § 302.211 Procedures in certificate cases involving initial or continuing fitness... applicant's fitness to operate. Where such applications propose the operation of scheduled service in...
14 CFR 302.211 - Procedures in certificate cases involving initial or continuing fitness.
Code of Federal Regulations, 2011 CFR
2011-01-01
... initial or continuing fitness. 302.211 Section 302.211 Aeronautics and Space OFFICE OF THE SECRETARY... Disposition of Applications § 302.211 Procedures in certificate cases involving initial or continuing fitness... applicant's fitness to operate. Where such applications propose the operation of scheduled service in...
20 CFR 416.557 - Personal conference.
Code of Federal Regulations, 2010 CFR
2010-04-01
... notified in writing and given the dates, times and place of the file review and personal conference; the procedure for reviewing the claims file prior to the personal conference; the procedure for seeking a change... individual about the personal conference. The file review is always scheduled at least 5 days before the...
20 CFR 416.557 - Personal conference.
Code of Federal Regulations, 2011 CFR
2011-04-01
... notified in writing and given the dates, times and place of the file review and personal conference; the procedure for reviewing the claims file prior to the personal conference; the procedure for seeking a change... individual about the personal conference. The file review is always scheduled at least 5 days before the...
7 CFR 1753.8 - Contract construction procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... of all bids including “Buy American” evaluations, if any, and all other evaluations required by law... Contract construction procedures. (a) Sealed, competitive bidding—(1) Bid opening date. The borrower is responsible for scheduling the bid opening date. If RUS review of P&S is required by § 1753.7, the borrower...
Motivational Control of Impulsive Behavior Interacts with Choice Opportunities
ERIC Educational Resources Information Center
Tanno, Takayuki; Kurashima, Ryo; Watanabe, Shigeru
2011-01-01
Impulsive behavior has been investigated through choice between a smaller/immediate reinforcer and a larger/delayed reinforcer, or through performance on a differential reinforcement of low rate (DRL) schedule. In the present study, we investigated a methodological divergence between these two procedures: in the former procedure, delay is a…
Advances in contact algorithms and their application to tires
NASA Technical Reports Server (NTRS)
Noor, Ahmed K.; Tanner, John A.
1988-01-01
Currently used techniques for tire contact analysis are reviewed. Discussion focuses on the different techniques used in modeling frictional forces and the treatment of contact conditions. A status report is presented on a new computational strategy for the modeling and analysis of tires, including the solution of the contact problem. The key elements of the proposed strategy are: (1) use of semianalytic mixed finite elements in which the shell variables are represented by Fourier series in the circumferential direction and piecewise polynomials in the meridional direction; (2) use of perturbed Lagrangian formulation for the determination of the contact area and pressure; and (3) application of multilevel iterative procedures and reduction techniques to generate the response of the tire. Numerical results are presented to demonstrate the effectiveness of a proposed procedure for generating the tire response associated with different Fourier harmonics.
Levy, AnneMarie; Limebeer, Cheryl L.; Ferdinand, Justin; Shillingford, Ucal; Parker, Linda A.; Leri, Francesco
2014-01-01
This paper describes a novel method for studying the bio-behavioral basis of addiction to food. This method combines the surgical component of taste reactivity with the behavioral aspects of operant self-administration of drugs. Under very brief general anaesthesia, rats are implanted with an intraoral (IO) cannula that allows delivery of test solutions directly in the oral cavity. Animals are then tested in operant self-administration chambers whereby they can press a lever to receive IO infusions of test solutions. IO self-administration has several advantages over experimental procedures that involve drinking a solution from a spout or operant responding for solid pellets or solutions delivered in a receptacle. Here, we show that IO self-administration can be employed to study self-administration of high fructose corn syrup (HFCS). Rats were first tested for self-administration on a progressive ratio (PR) schedule, which assesses the maximum amount of operant behavior that will be emitted for different concentrations of HFCS (i.e. 8%, 25%, and 50%). Following this test, rats self-administered these concentrations on a continuous schedule of reinforcement (i.e. one infusion for each lever press) for 10 consecutive days (1 session/day; each lasting 3 hr), and then they were retested on the PR schedule. On the continuous reinforcement schedule, rats took fewer infusions of higher concentrations, although the lowest concentration of HFCS (8%) maintained more variable self-administration. Furthermore, the PR tests revealed that 8% had lower reinforcing value than 25% and 50%. These results indicate that IO self-administration can be employed to study acquisition and maintenance of responding for sweet solutions. The sensitivity of the operant response to differences in concentration and schedule of reinforcement makes IO self-administration an ideal procedure to investigate the neurobiology of voluntary intake of sweets. PMID:24561923
Behavioral regulation of gravity: schedule effects under escape-avoidance procedures1
Clark, Fogle C.; Lange, Karl O.; Belleville, Richard E.
1973-01-01
Squirrel monkeys were restrained in a centrifuge capsule and trained to escape and avoid increases in artificial gravity. During escape-avoidance, lever responses reduced centrifugally simulated gravity or postponed scheduled increases. The effect of variation in the interval of postponement (equal to the duration of decrease produced by escape responses) was studied under a multiple schedule of four components. Three components were gravity escape-avoidance with postponement times of 20, 40, and 60 sec. The fourth component was extinction. Each component was associated with a different auditory stimulus. Rate of responding decreased with increasing postponement time and higher mean g-levels occurred at shorter intervals of postponement. Effects of the schedule parameter on response rate and mean g-level were similar to effects of the schedule on free-operant avoidance and on titration behavior maintained by shock. ImagesFig. 1. PMID:4202386
An investigation of the use of temporal decomposition in space mission scheduling
NASA Technical Reports Server (NTRS)
Bullington, Stanley E.; Narayanan, Venkat
1994-01-01
This research involves an examination of techniques for solving scheduling problems in long-duration space missions. The mission timeline is broken up into several time segments, which are then scheduled incrementally. Three methods are presented for identifying the activities that are to be attempted within these segments. The first method is a mathematical model, which is presented primarily to illustrate the structure of the temporal decomposition problem. Since the mathematical model is bound to be computationally prohibitive for realistic problems, two heuristic assignment procedures are also presented. The first heuristic method is based on dispatching rules for activity selection, and the second heuristic assigns performances of a model evenly over timeline segments. These heuristics are tested using a sample Space Station mission and a Spacelab mission. The results are compared with those obtained by scheduling the missions without any problem decomposition. The applicability of this approach to large-scale mission scheduling problems is also discussed.
Green, L; Kagel, J H; Battalio, R C
1987-01-01
Pigeons' rates of responding and food reinforcement under simple random-ratio schedules were compared with those obtained under comparable ratio schedules in which free food deliveries were added, but the duration of each food delivery was halved. These ratio-with-free-food schedules were constructed so that, were the pigeon to maintain the same rate of responding as it had under the simple ratio schedule, total food obtained (earned plus free) would remain unchanged. However, any reduction in responding would reduce total food consumption below that under the simple ratio schedule. These "compensated wage decreases" led to decreases in responding and decreases in food consumption, as predicted by an economic model of labor supply. Moreover, the reductions in responding increased as the ratio value increased (i.e., as wage rates decreased). Pigeons, therefore, substituted leisure for consumption. The relationship between these procedures and negative-income-tax programs is noted.
Application of precomputed control laws in a reconfigurable aircraft flight control system
NASA Technical Reports Server (NTRS)
Moerder, Daniel D.; Halyo, Nesim; Broussard, John R.; Caglayan, Alper K.
1989-01-01
A self-repairing flight control system concept in which the control law is reconfigured after actuator and/or control surface damage to preserve stability and pilot command tracking is described. A key feature of the controller is reconfigurable multivariable feedback. The feedback gains are designed off-line and scheduled as a function of the aircraft control impairment status so that reconfiguration is performed simply by updating the gain schedule after detection of an impairment. A novel aspect of the gain schedule design procedure is that the schedule is calculated using a linear quadratic optimization-based simultaneous stabilization algorithm in which the scheduled gain is constrained to stabilize a collection of plant models representing the aircraft in various control failure modes. A description and numerical evaluation of a controller design for a model of a statically unstable high-performance aircraft are given.
Evenden, John
2002-10-01
Psychosis and psychotomimetic drugs result in a disorganisation of the structure of thought and behaviour. Normalising these is one of the objects of antipsychotic therapy, and methods for predicting such a therapeutic effect would be of value. The effects of a number of psychotomimetic agents were examined on the way in which rats distributed responding over two response levers using two different procedures, to assay their effects on behavioural organisation. Previously, amphetamine has been found to increase response switching using these schedules. In the first, the random reinforcement procedure, one of the two levers was selected at random as "correct", and responses on this lever were reinforced with food under a random ratio schedule. No signal was given to distinguish the levers. Responding could also result in the food tray being illuminated, but no food pellet was delivered ("no-food" event). Responses on the second lever ("incorrect") had no programmed consequences. After each food delivery or "no-food" event the levers designated as "correct" and "incorrect" were reassigned at random, and the rat had to open the food tray to restart the schedule. In the second procedure, the rats were required to make 21 responses before a switch between the two levers resulted in food delivery [Fixed Ratio (FR) 21-switch]. The responses making up the FR could be distributed freely between the two levers. Phencyclidine (PCP), scopolamine, caffeine and ethanol increased switching under the random reinforcement procedure, but (+/-)-2,5-dimethoxy-4-iodoamphetamine hydrochloride (DOI) and atropine did not. PCP, caffeine, lysergic acid diethylamide (LSD) and atropine increased switching under the FR21-switch procedure, but ethanol did not. The increases in switching produced by PCP, LSD and the anticholinergics were accompanied by marked reductions in response rate, whereas those produced by amphetamine and caffeine were not. The effects of amphetamine, and PCP were strongly dependent on the baseline probability of switching, those of atropine and caffeine moderately so, and those of LSD and ethanol only weakly so. Of the agents tested, psychomotor stimulants appear to produce the most selective increases in switching. The procedures described here may be useful for assaying the disorganisation of behaviour produced by other psychotomimetics and may have value in the detection of novel antipsychotic drugs.
29 CFR 37.88 - Who may contact CRC about a complaint?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 1 2010-07-01 2010-07-01 true Who may contact CRC about a complaint? 37.88 Section 37.88... PROVISIONS OF THE WORKFORCE INVESTMENT ACT OF 1998 (WIA) Compliance Procedures § 37.88 Who may contact CRC... contact CRC for information about the complaint. The Director will determine what information, if any...
Caesar, Ulla; Karlsson, Jon; Hansson, Elisabeth
2018-01-01
Emergency surgery is unplanned by definition and patients are scheduled for surgery with minimal preparation. Some patients who have sustained emergency orthopaedic trauma or other conditions must be operated on immediately or within a few hours, while others can wait until the hospital's resources permit and/or the patients' health status has been optimised as needed. This may affect the prioritisation procedures for both emergency and elective surgery and might result in waiting lists, not only for planned procedures but also for emergencies. The main purpose of this retrospective, observational, single-centre study was to evaluate and describe for the number and reasons of delays, as well as waiting times in emergency orthopaedic surgery using data derived from the hospital's records and registers. All the emergency patients scheduled for emergency surgery whose procedures were rescheduled and delayed between 1 January 2007 and 31 December 2013 were studied. We found that 24% (8474) of the 36,017 patients scheduled for emergency surgeries were delayed and rescheduled at least once, some several times. Eighty per cent of these delays were due to organisational causes. Twenty-one per cent of all the delayed patients had surgery within 24 h, whilst 41% waited for more than 24 h, up to 3 days. A large number of the clinic's emergency orthopaedic procedures were rescheduled and delayed and the majority of the delays were related to organisational reasons. The results can be interpreted in two ways; first, organisational reasons are avoidable and the potential for improvement is great and, secondly and most importantly, the delays might negatively affect patient outcomes.
TDRS-M Atlas V First and Second Stage Arrival
2017-06-26
The United Launch Alliance (ULA) Mariner arrives at Port Canaveral in Florida carrying an Atlas V rocket booster bound for nearby Cape Canaveral Air Force Station. The rocket is scheduled to launch the Tracking and Data Relay Satellite, TDRS-M. It will be the latest spacecraft destined for the agency's constellation of communications satellites that allows nearly continuous contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. Liftoff atop the ULA Atlas V rocket is scheduled to take place from Cape Canaveral's Space Launch Complex 41 on Aug. 3, 2017 at 9:02 a.m. EDT.
TDRS-M Atlas V Booster and Centaur Stages Offload, Booster Trans
2017-06-27
A United Launch Alliance Atlas V rocket booster arrives at the Atlas Spaceflight Operations Center at Cape Canaveral Air Force Station in Florida. The rocket is scheduled to launch the Tracking and Data Relay Satellite, TDRS-M. It will be the latest spacecraft destined for the agency's constellation of communications satellites that allows nearly continuous contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. Liftoff atop the ULA Atlas V rocket is scheduled to take place from Cape Canaveral's Space Launch Complex 41 on Aug. 3, 2017 at 9:02 a.m. EDT.
TDRS-M Atlas V Booster and Centaur Stages Offload, Booster Trans
2017-06-27
A United Launch Alliance Atlas V rocket booster is transported to the Atlas Spaceflight Operations Center at Cape Canaveral Air Force Station in Florida. The rocket is scheduled to launch the Tracking and Data Relay Satellite, TDRS-M. It will be the latest spacecraft destined for the agency's constellation of communications satellites that allows nearly continuous contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. Liftoff atop the ULA Atlas V rocket is scheduled to take place from Cape Canaveral's Space Launch Complex 41 on Aug. 3, 2017 at 9:02 a.m. EDT.
TDRS-M Atlas V Booster and Centaur Stages Offload, Booster Trans
2017-06-27
The United Launch Alliance (ULA) Mariner arrives at Port Canaveral in Florida carrying an Atlas V rocket booster bound for nearby Cape Canaveral Air Force Station. The rocket is scheduled to launch the Tracking and Data Relay Satellite, TDRS-M. It will be the latest spacecraft destined for the agency's constellation of communications satellites that allows nearly continuous contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. Liftoff atop the ULA Atlas V rocket is scheduled to take place from Cape Canaveral's Space Launch Complex 41 on Aug. 3, 2017 at 9:02 a.m. EDT.
A derived heuristics based multi-objective optimization procedure for micro-grid scheduling
NASA Astrophysics Data System (ADS)
Li, Xin; Deb, Kalyanmoy; Fang, Yanjun
2017-06-01
With the availability of different types of power generators to be used in an electric micro-grid system, their operation scheduling as the load demand changes with time becomes an important task. Besides satisfying load balance constraints and the generator's rated power, several other practicalities, such as limited availability of grid power and restricted ramping of power output from generators, must all be considered during the operation scheduling process, which makes it difficult to decide whether the optimization results are accurate and satisfactory. In solving such complex practical problems, heuristics-based customized optimization algorithms are suggested. However, due to nonlinear and complex interactions of variables, it is difficult to come up with heuristics in such problems off-hand. In this article, a two-step strategy is proposed in which the first task deciphers important heuristics about the problem and the second task utilizes the derived heuristics to solve the original problem in a computationally fast manner. Specifically, the specific operation scheduling is considered from a two-objective (cost and emission) point of view. The first task develops basic and advanced level knowledge bases offline from a series of prior demand-wise optimization runs and then the second task utilizes them to modify optimized solutions in an application scenario. Results on island and grid connected modes and several pragmatic formulations of the micro-grid operation scheduling problem clearly indicate the merit of the proposed two-step procedure.
49 CFR 572.126 - Knees and knee impact test procedure.
Code of Federal Regulations, 2014 CFR
2014-10-01
... procedure in section 572.127(c), the peak resistance force as measured with the test probe mounted... exterior surface. (3) Align the test probe so that throughout its stroke and at contact with the knee it is... probe velocity at the time of contact shall be 2.1 ±0.03 m/s (6.9 # 0.1 ft/s). (6) No suspension...
49 CFR 572.126 - Knees and knee impact test procedure.
Code of Federal Regulations, 2011 CFR
2011-10-01
... procedure in section 572.127(c), the peak resistance force as measured with the test probe mounted... exterior surface. (3) Align the test probe so that throughout its stroke and at contact with the knee it is... probe velocity at the time of contact shall be 2.1 ±0.03 m/s (6.9 # 0.1 ft/s). (6) No suspension...
49 CFR 572.126 - Knees and knee impact test procedure.
Code of Federal Regulations, 2013 CFR
2013-10-01
... procedure in section 572.127(c), the peak resistance force as measured with the test probe mounted... exterior surface. (3) Align the test probe so that throughout its stroke and at contact with the knee it is... probe velocity at the time of contact shall be 2.1 ±0.03 m/s (6.9 # 0.1 ft/s). (6) No suspension...
49 CFR 572.126 - Knees and knee impact test procedure.
Code of Federal Regulations, 2010 CFR
2010-10-01
... procedure in section 572.127(c), the peak resistance force as measured with the test probe mounted... exterior surface. (3) Align the test probe so that throughout its stroke and at contact with the knee it is... probe velocity at the time of contact shall be 2.1 ±0.03 m/s (6.9 # 0.1 ft/s). (6) No suspension...
49 CFR 572.126 - Knees and knee impact test procedure.
Code of Federal Regulations, 2012 CFR
2012-10-01
... procedure in section 572.127(c), the peak resistance force as measured with the test probe mounted... exterior surface. (3) Align the test probe so that throughout its stroke and at contact with the knee it is... probe velocity at the time of contact shall be 2.1 ±0.03 m/s (6.9 # 0.1 ft/s). (6) No suspension...
Does telephone scheduling assistance increase mammography screening adherence?
Payton, Colleen A; Sarfaty, Mona; Beckett, Shirley; Campos, Carmen; Hilbert, Kathleen
2015-11-01
The 2 objectives were: 1) describe the use of a patient navigation process utilized to promote adherence to mammography screening within a primary care practice, and 2) determine the result of the navigation process and estimate the time required to increase mammography screening with this approach in a commercially insured patient population enrolled in a health maintenance organization. An evaluation of a nonrandomized practice improvement intervention. Women eligible for mammography (n = 298) who did not respond to 2 reminder letters were contacted via telephone by a navigator who offered scheduling assistance for mammography screening. The patient navigator scheduled appointments, documented the number of calls, and confirmed completed mammograms in the electronic health record, as well as estimated the time for calls and chart review. Of the 188 participants reached by phone, 112 (59%) scheduled appointments using the patient navigator, 35 (19%) scheduled their own appointments independently prior to the call, and 41 (22%) declined. As a result of the telephone intervention, 78 of the 188 women reached (41%) received a mammogram; also, all 35 women who had independently scheduled a mammogram received one. Chart documentation confirmed that 113 (38%) of the cohort of 298 women completed a mammogram. The estimated time burden for the entire project was 55 hours and 33 minutes, including calling patients, scheduling appointments, and chart review. A patient navigator can increase mammography adherence in a previously nonadherent population by making the screening appointment while the patient is on the phone.
Collaborative Resource Allocation
NASA Technical Reports Server (NTRS)
Wang, Yeou-Fang; Wax, Allan; Lam, Raymond; Baldwin, John; Borden, Chester
2007-01-01
Collaborative Resource Allocation Networking Environment (CRANE) Version 0.5 is a prototype created to prove the newest concept of using a distributed environment to schedule Deep Space Network (DSN) antenna times in a collaborative fashion. This program is for all space-flight and terrestrial science project users and DSN schedulers to perform scheduling activities and conflict resolution, both synchronously and asynchronously. Project schedulers can, for the first time, participate directly in scheduling their tracking times into the official DSN schedule, and negotiate directly with other projects in an integrated scheduling system. A master schedule covers long-range, mid-range, near-real-time, and real-time scheduling time frames all in one, rather than the current method of separate functions that are supported by different processes and tools. CRANE also provides private workspaces (both dynamic and static), data sharing, scenario management, user control, rapid messaging (based on Java Message Service), data/time synchronization, workflow management, notification (including emails), conflict checking, and a linkage to a schedule generation engine. The data structure with corresponding database design combines object trees with multiple associated mortal instances and relational database to provide unprecedented traceability and simplify the existing DSN XML schedule representation. These technologies are used to provide traceability, schedule negotiation, conflict resolution, and load forecasting from real-time operations to long-range loading analysis up to 20 years in the future. CRANE includes a database, a stored procedure layer, an agent-based middle tier, a Web service wrapper, a Windows Integrated Analysis Environment (IAE), a Java application, and a Web page interface.
Yates, Justin R; Breitenstein, Kerry A; Gunkel, Benjamin T; Hughes, Mallory N; Johnson, Anthony B; Rogers, Katherine K; Shape, Sara M
Risky decision making can be measured using a probability-discounting procedure, in which animals choose between a small, certain reinforcer and a large, uncertain reinforcer. Recent evidence has identified glutamate as a mediator of risky decision making, as blocking the N-methyl-d-aspartate (NMDA) receptor with MK-801 increases preference for a large, uncertain reinforcer. Because the order in which probabilities associated with the large reinforcer can modulate the effects of drugs on choice, the current study determined if NMDA receptor ligands alter probability discounting using ascending and descending schedules. Sixteen rats were trained in a probability-discounting procedure in which the odds against obtaining the large reinforcer increased (n=8) or decreased (n=8) across blocks of trials. Following behavioral training, rats received treatments of the NMDA receptor ligands MK-801 (uncompetitive antagonist; 0, 0.003, 0.01, or 0.03mg/kg), ketamine (uncompetitive antagonist; 0, 1.0, 5.0, or 10.0mg/kg), and ifenprodil (NR2B-selective non-competitive antagonist; 0, 1.0, 3.0, or 10.0mg/kg). Results showed discounting was steeper (indicating increased risk aversion) for rats on an ascending schedule relative to rats on the descending schedule. Furthermore, the effects of MK-801, ketamine, and ifenprodil on discounting were dependent on the schedule used. Specifically, the highest dose of each drug decreased risk taking in rats in the descending schedule, but only MK-801 (0.03mg/kg) increased risk taking in rats on an ascending schedule. These results show that probability presentation order modulates the effects of NMDA receptor ligands on risky decision making. Copyright © 2016 Elsevier Inc. All rights reserved.
Keith, D; Hong, B; Christensen, M
1997-05-01
A quick, simple, and efficient extraction technique was developed for the removal of protein from soft hydrophilic contact lenses. An extraction solvent consisting of a 50:50 mix of 0.2% trifluoroacetic acid and acetonitrile was used to remove protein from in vitro laboratory-deposited and human-worn contact lenses. The protein removed was analyzed using HPLC, bicinchoninic acid (BCA) analysis, and SDS-PAGE gel electreophoresis. Extraction efficiency for lysozyme from laboratory-deposited Group IV lenses was determined to be approximately 100%. Group IV human-worn contact lenses were extracted and analyzed for lysozyme by HPLC and total protein by bicinchoninic acid (BCA) analysis. Groups I, II, III, and IV contact lenses deposited with an artificial tear protein solution and human-worn lenses were extracted and analyzed by SDS-PAGE gel electreophoresis and micro-BCA. The ACN/TFA procedure offers a simple, quick, and efficient extraction technique for removal of protein from contact lenses for subsequent analysis.
Verma, Akash; Lee, Mui Yok; Wang, Chunhong; Hussein, Nurmalah B M; Selvi, Kalai; Tee, Augustine
2014-04-01
The purpose of this study was to assess the efficiency of performing pulmonary procedures in the endoscopy unit in a large teaching hospital. A prospective study from May 20 to July 19, 2013, was designed. The main outcome measures were procedure delays and their reasons, duration of procedural steps starting from patient's arrival to endoscopy unit, turnaround time, total case durations, and procedure wait time. A total of 65 procedures were observed. The most common procedure was BAL (61%) followed by TBLB (31%). Overall procedures for 35 (53.8%) of 65 patients were delayed by ≥ 30 minutes, 21/35 (60%) because of "spillover" of the gastrointestinal and surgical cases into the time block of pulmonary procedure. Time elapsed between end of pulmonary procedure and start of the next procedure was ≥ 30 minutes in 8/51 (16%) of cases. In 18/51 (35%) patients there was no next case in the room after completion of the pulmonary procedure. The average idle time of the room after the end of pulmonary procedure and start of next case or end of shift at 5:00 PM if no next case was 58 ± 53 minutes. In 17/51 (33%) patients the room's idle time was >60 minutes. A total of 52.3% of patients had the wait time >2 days and 11% had it ≥ 6 days, reason in 15/21 (71%) being unavailability of the slot. Most pulmonary procedures were delayed due to spillover of the gastrointestinal and surgical cases into the block time allocated to pulmonary procedures. The most common reason for difficulty encountered in scheduling the pulmonary procedure was slot unavailability. This caused increased procedure waiting time. The strategies to reduce procedure delays and turnaround times, along with improved scheduling methods, may have a favorable impact on the volume of procedures performed in the unit thereby optimizing the existing resources.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
... requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272... information provided, unless the comment includes Confidential Business Information (CBI) or other information... the hard copy materials, please schedule an appointment during normal business hours with the contact...
21 CFR 1306.13 - Partial filling of prescriptions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... listed in Schedule II is permissible, if the pharmacist is unable to supply the full quantity called for... remaining portion is not or cannot be filled within the 72-hour period, the pharmacist shall so notify the... patient may be classified as having a terminal illness, the pharmacist must contact the practitioner prior...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-23
... to capture public comment and current medical science information from presentations made by subject matter experts. This Forum is scheduled for January 17-26, 2012. VA plans to use this information to... first-come, first-served basis. FOR FURTHER INFORMATION CONTACT: Nick Olmos-Lau, M.D., Regulation Staff...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... included in the public docket without change and may be made available online at www.regulations.gov , including any personal information provided, unless the comment includes Confidential Business Information... materials, please schedule an appointment during normal business hours with the contact listed in the FOR...
Locations & Contacts | Cancer Prevention Fellowship Program
The Principles and Practice of Cancer Prevention and Control course is held in July. The Molecular Prevention course is held in early August. Both courses will be held in Bethesda or Rockville, Maryland. Lectures are usually scheduled Monday through Friday, from 9:00 a.m. to 3:30 p.m. (lecture times may vary year to year).
ERIC Educational Resources Information Center
Fuhrman, Ashley M.; Fisher, Wayne W.; Greer, Brian D.
2016-01-01
Despite the effectiveness and widespread use of functional communication training (FCT), resurgence of destructive behavior can occur if the functional communication response (FCR) contacts a challenge, such as lapses in treatment integrity. We evaluated a method to mitigate resurgence by conducting FCT using a multiple schedule of reinforcement…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-25
... INFORMATION CONTACT: Crystal Rennie, Enterprise Records Service (005R1B), Department of Veterans Affairs, 810 Vermont Avenue NW., Washington, DC 20420, (202) 632-7492 or email crystal[email protected] . Please refer to... and scheduled to become residents of permanent housing within a specified time period, or after...
Chemical Sciences and Engineering - US China Electric Vehicle and Battery
Technology Workshop Argonne National Laboratory Chemical Sciences & Engineering DOE Logo Photo Gallery Hotels Maps Bus Schedule Contact Us TCS Building and Conference Center, Argonne National Lab TCS Building and Conference Center United States Flag China flag 2011 U.S.-China Electric Vehicle
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-06
... index, some information is not publicly available, i.e., Confidential Business Information (CBI) or... INFORMATION CONTACT section to schedule your inspection. The Regional Office's official hours of business are... assumptions made about the relationship drive model results and, thus, are important in evaluating the result...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-25
...: Small Entity Compliance Guide. SUMMARY: This document is issued under the joint authority of DOD, GSA... the FAR case number. For information pertaining to status or publication schedules, contact the Regulatory Secretariat at 202- 501-4755. Rules Listed in FAC 2005-71 Item Subject FAR Case Analyst *I...
United States Southern Command * Home
Office offers various tests to service members for professional development. To schedule a test or for Proficiency Test (DLPT), DANTES/CLEP , Air Force E-Exam program and more please contact us via email or call ROTC | GoArmyEd | Green to Gold | National Guard Education | Westpoint Coast Guard: College Pre
76 FR 22077 - Gogebic Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-20
... building to view comments. FOR FURTHER INFORMATION CONTACT: Lisa Klaus, RAC coordinator, USDA, Ottawa National Forest, E6248 U.S. Hwy. 2, Ironwood, MI, (906) 932- 1330, ext. 328; e-mail [email protected] scheduled on the agenda. Written comments and requests for time for oral comments must be sent to Lisa Klaus...
Production Process for Strong, Light Ceramic Tiles
NASA Technical Reports Server (NTRS)
Holmquist, G. R.; Cordia, E. R.; Tomer, R. S.
1985-01-01
Proportions of ingredients and sintering time/temperature schedule changed. Production process for lightweight, high-strength ceramic insulating tiles for Space Shuttle more than just scaled-up version of laboratory process for making small tiles. Boron in aluminum borosilicate fibers allows fusion at points where fibers contact each other during sintering, thereby greatly strengthening tiles structure.
77 FR 27671 - State of Hawaii; Regional Haze Federal Implementation Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-11
... material, large maps), and some may not be publicly available in either location (e.g., CBI). To inspect the hard copy materials, please schedule an appointment during normal business hours with the contact... questions and discussion, EPA will hold open houses prior to the public hearings. During these open houses...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-07
... Toronto Reservoir, part of the Swinging Bridge Hydroelectric Project, is located on Black Lake Creek in.... Applicant Contact: Robert A. Gates, Senior Vice President Operations, Eagle Creek RE, LLC, 65 Madison Avenue... regarding recreation activities, hours of operation and maintenance scheduling. l. Locations of the...
Image Use Fees | Galaxy of Images
This site has moved! Please go to our new Image Gallery site! dot header Image Use Fees Licensing , research and study purposes only. For current pricing, please download our Image Use Fee Schedule See our Frequently Asked Questions (FAQ) list for additional information. Purchase an image now Contact Information
ERIC Educational Resources Information Center
Horner, Beth
1984-01-01
Discusses aspects inherent in maintaining a library position while developing a separate freelance career as exemplified by personal experiences as a children's librarian and freelance storyteller. Potential problems (fatigue, clear boundaries, scheduling) and advantages for the individual (financial security, professional contacts) and the…
A Closed Mars Analog Simulation: The Approach of Crew 5 At the Mars Desert Research Station
NASA Technical Reports Server (NTRS)
Clancey, William J.; Koga, Dennis (Technical Monitor)
2002-01-01
For twelve days in April 2002 we performed a closed simulation in the Mars Desert Research Station, isolated from other people, as on Mars, while performing systematic surface exploration and life support chores. Email provided our only means of contact; no phone or radio conversations were possible. All mission-related messages were mediated by a remote mission support team. This protocol enabled a systematic and controlled study of crew activities, scheduling, and use of space. The analysis presented here focuses on two questions: Where did the time go-why did people feel rushed and unable to complete their work? How can we measure and model productivity, to compare habitat designs, schedules, roles, and tools? Analysis suggests that a simple scheduling change-having lunch and dinner earlier, plus eliminating afternoon meetings-increased the available productive time by 41%.
Influence of Temporal Context on Value in the Multiple-Chains and Successive-Encounters Procedures
ERIC Educational Resources Information Center
O'Daly, Matthew; Angulo, Samuel; Gipson, Cassandra; Fantino, Edmund
2006-01-01
This set of studies explored the influence of temporal context across multiple-chain and multiple-successive-encounters procedures. Following training with different temporal contexts, the value of stimuli sharing similar reinforcement schedules was assessed by presenting these stimuli in concurrent probes. The results for the multiple-chain…
Development of an Observational Procedure for Assessment of Parent-Child Interaction.
ERIC Educational Resources Information Center
Cunningham, Jo Lynn; Boger, Robert P.
The feasibility of using an observational rating schedule to elicit information about parent-child interaction was studied. The Parent-Child Interaction Rating Procedure (P-CIRP), focusing specifically on parent-child interaction with a structured teaching task, was developed for this purpose. The interaction setting is teaching the child simple…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-25
...This document announces the procedures and minimum opening bids for the upcoming auction of licenses in the lower and upper paging bands (Auction 95). This document is intended to familiarize prospective applicants with the procedures and other requirements for participation in the auction.
23 CFR 669.21 - Procedure for evaluating state compliance.
Code of Federal Regulations, 2010 CFR
2010-04-01
... automated file as evidence that proof of payment has been received before vehicles subject to the Federal... TRAFFIC OPERATIONS ENFORCEMENT OF HEAVY VEHICLE USE TAX § 669.21 Procedure for evaluating state compliance.... In lieu of retention of Schedule 1, states may make an appropriate entry in an automated file or on...
Amirghasemi, Mehrdad; Zamani, Reza
2014-01-01
This paper presents an effective procedure for solving the job shop problem. Synergistically combining small and large neighborhood schemes, the procedure consists of four components, namely (i) a construction method for generating semi-active schedules by a forward-backward mechanism, (ii) a local search for manipulating a small neighborhood structure guided by a tabu list, (iii) a feedback-based mechanism for perturbing the solutions generated, and (iv) a very large-neighborhood local search guided by a forward-backward shifting bottleneck method. The combination of shifting bottleneck mechanism and tabu list is used as a means of the manipulation of neighborhood structures, and the perturbation mechanism employed diversifies the search. A feedback mechanism, called repeat-check, detects consequent repeats and ignites a perturbation when the total number of consecutive repeats for two identical makespan values reaches a given threshold. The results of extensive computational experiments on the benchmark instances indicate that the combination of these four components is synergetic, in the sense that they collectively make the procedure fast and robust.
Dental scanning in CAD/CAM technologies: laser beams
NASA Astrophysics Data System (ADS)
Sinescu, Cosmin; Negrutiu, Meda; Faur, Nicolae; Negru, Radu; Romînu, Mihai; Cozarov, Dalibor
2008-02-01
Scanning, also called digitizing, is the process of gathering the requisite data from an object. Many different technologies are used to collect three dimensional data. They range from mechanical and very slow, to radiation-based and highly-automated. Each technology has its advantages and disadvantages, and their applications and specifications overlap. The aims of this study are represented by establishing a viable method of digitally representing artifacts of dental casts, proposing a suitable scanner and post-processing software and obtaining 3D Models for the dental applications. The method is represented by the scanning procedure made by different scanners as the implicated materials. Scanners are the medium of data capture. 3D scanners aim to measure and record the relative distance between the object's surface and a known point in space. This geometric data is represented in the form of point cloud data. The contact and no contact scanners were presented. The results show that contact scanning procedures uses a touch probe to record the relative position of points on the objects' surface. This procedure is commonly used in Reverse engineering applications. Its merits are represented by efficiency for objects with low geometric surface detail. Disadvantages are represented by time consuming, this procedure being impractical for artifacts digitization. The non contact scanning procedure implies laser scanning (laser triangulation technology) and photogrammetry. As a conclusion it can be drawn that different types of dental structure needs different types of scanning procedures in order to obtain a competitive complex 3D virtual model that can be used in CAD/CAM technologies.
Soremekun, Olan A; Zane, Richard D; Walls, Andrew; Allen, Matthew B; Seefeld, Kimberly J; Pallin, Daniel J
2011-06-01
The ability to generate hospital beds in response to a mass-casualty incident is an essential component of public health preparedness. Although many acute care hospitals' emergency response plans include some provision for delaying or cancelling elective procedures in the event of an inpatient surge, no standardized method for implementing and quantifying the impact of this strategy exists in the literature. The aim of this study was to develop a methodology to prospectively emergency plan for implementing a strategy of delaying procedures and quantifying the potential impact of this strategy on creating hospital bed capacity. This is a pilot study. A categorization methodology was devised and applied retrospectively to all scheduled procedures during four one-week periods chosen by convenience. The categorization scheme grouped procedures into four categories: (A) procedures with no impact on inpatient capacity; (B) procedures that could be delayed indefinitely; (C) procedures that could be delayed by one week; and (D) procedures that could not be delayed. The categorization scheme was applied by two research assistants and an emergency medicine resident. All three raters categorized the first 100 cases to allow for calculation of inter-rater reliability. Maximal hospital bed capacity was defined as the 95th percentile weekday occupancy, as this is more representative of functional bed capacity than is the number of licensed beds. The main outcome was the number of hospital beds that could be created by postponing procedures in categories B and C. Maximal hospital bed capacity was 816 beds. Mean occupancy during weekdays was 759 versus 694 on weekends. By postponing Group B and C procedures, a mean of 60 beds (51 general medical/surgical and nine intensive care unit (ICU)) could be created on weekdays, and four beds (three general medical/surgical and one ICU) on weekends. This represents 7.3% and 0.49% of maximal hospital bed capacity and ICU capacity, respectively. In the event that sustained surge is needed, delaying all category B and C procedures for one week would lead to the generation of 1,235 hospital-bed days. Inter-rater reliability was high (kappa = 0.74) indicating good agreement between all three raters. For the institution studied, the strategy of delaying scheduled procedures could generate inpatient capacity with maximal impact during weekdays and little impact on weekends. Future research is needed to validate the categorization scheme and increase the ability to predict inpatient surge capacity across various hospital types and sizes.
Surgical scheduling: a lean approach to process improvement.
Simon, Ross William; Canacari, Elena G
2014-01-01
A large teaching hospital in the northeast United States had an inefficient, paper-based process for scheduling orthopedic surgery that caused delays and contributed to site/side discrepancies. The hospital's leaders formed a team with the goals of developing a safe, effective, patient-centered, timely, efficient, and accurate orthopedic scheduling process; smoothing the schedule so that block time was allocated more evenly; and ensuring correct site/side. Under the resulting process, real-time patient information is entered into a database during the patient's preoperative visit in the surgeon's office. The team found the new process reduced the occurrence of site/side discrepancies to zero, reduced instances of changing the sequence of orthopedic procedures by 70%, and increased patient satisfaction. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.
Development of a Contact Permeation Test Fixture and Method
2013-04-01
direct contact with the skin, indicates the need for a quantitative contact test method. Comparison tests were conducted with VX on a standardized...Guide for the Care and Use of Laboratory Animals (8th ed.; National Research Council: Washington, DC, 2011). This test was also performed in...1 1.2 Development of a Contact-Based Permeation Test Method ........................................ 1 2. EXPERIMENTAL PROCEDURES
Integrated dynamic modeling of rail vehicles and infrastructure : modeling switch geometry.
DOT National Transportation Integrated Search
2015-08-27
Many procedures have been proposed to solve the wheel/rail contact problem, most of which belong to one of two categories: off-line and on-line contact search methods. This investigation is focused on the development of a contact surface model for th...
45 CFR 160.510 - Ex parte contacts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 1 2013-10-01 2013-10-01 false Ex parte contacts. 160.510 Section 160.510 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS GENERAL ADMINISTRATIVE REQUIREMENTS Procedures for Hearings § 160.510 Ex parte contacts. No party or...
45 CFR 160.510 - Ex parte contacts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 1 2010-10-01 2010-10-01 false Ex parte contacts. 160.510 Section 160.510 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS GENERAL ADMINISTRATIVE REQUIREMENTS Procedures for Hearings § 160.510 Ex parte contacts. No party or...
5 CFR 297.106 - Contact point for Privacy Act matters.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Contact point for Privacy Act matters. 297.106 Section 297.106 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PRIVACY PROCEDURES FOR PERSONNEL RECORDS General Provisions § 297.106 Contact point for Privacy...
5 CFR 297.106 - Contact point for Privacy Act matters.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Contact point for Privacy Act matters. 297.106 Section 297.106 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PRIVACY PROCEDURES FOR PERSONNEL RECORDS General Provisions § 297.106 Contact point for Privacy...
2007-03-01
self -reporting. The interview process and resulting data analysis may be impacted by research bias since both were conducted by the same individual...the processes you employ? Answer: 97 MAJCOM CONTACTS RESPOSIBLE FOR GENERAL TCNO PROCEDURES SECTION 1: INTERVIEWEE INFO Question 1: Please...BASE-LEVEL NCC CONTACTS RESPOSIBLE FOR GENERAL TCNO PROCEDURES SECTION 1: INTERVIEWEE INFO Question 1: Please provide your general job description
Contact laser prostatectomy in a patient on chronic anticoagulation
NASA Astrophysics Data System (ADS)
Mueller, Edward J.
1995-05-01
The `gold standard' therapy for patients with symptomatic bladder outlet obstruction secondary to benign prostatic hyperplasia has always been electrocautery TURP. However, in patients with medical problems requiring chronic anticoagulation, this procedure is contraindicated due to the extreme risk of hemorrhage, both during the procedure and the immediate post operative period. With the recent development of contact laser prostatectomy the patient on chronic anticoagulation can safely undergo the procedure. Herein, I present a case of a 60 year old with significant bladder outlet obstruction yielding an AUA symptom score of 18. The patient had a history of multiple episodes of deep venous thrombosis of the left leg with three prior pulmonary emboli. He was maintained on chronic anticoagulation with alternating days of 3.5 mg. and 5.0 mg. of warfarin sodium (coumadin). Preoperative cystoscopy showed a 4 cm prostatic fossa obstructed by tri-lobar hypertrophy, with large kissing lateral lobes and visual obstruction from the verumontanum. The patient underwent a contact laser prostatectomy with the SLT Nd:YAG laser at 50 watts. There was minimal bleeding both during the procedure and in the immediate postoperative period. At three months post-op the AUA symptom score had decreased to 2. This case demonstrated that contact laser prostatectomy can be safely and effectively performed in patients on chronic anticoagulation.
Mascareñas, A; Salinas, J; Tasset-Tisseau, A; Mascareñas, C; Khan, M M
2005-06-01
The World Health Organization recommends that all children aged less than 5 years should be vaccinated against polio through intensive immunization programmes as well as routine immunization. A national immunization week (NIW) was held in February 2002 in the Monterrey district of Mexico. A prospective micro-costing study was conducted to measure the total cost to the state of the NIW, the cost profile, and the ratio of cost per immunization contact to cost per dose of oral polio vaccine (OPV), and to compare OPV and inactive polio vaccine (IPV) in economic terms. Two scenarios were used as the basis for calculation. The cost of volunteers was excluded from the "lower-cost scenario" and included in the "upper-cost scenario". The total cost of the NIW was USD 100,454 for the lower-cost scenario and USD 156,614 for the upper-cost scenario. The major part of the costs was personnel costs (67.30 and 77.53% of the total costs in the lower- and upper-cost scenario, respectively). The ratio of cost per immunization contact to cost per dose of OPV was 6.45 for the lower-cost scenario and 10.05 for the upper-cost scenario. Changing from the current OPV-based intensive and routine schedule to a sequential IPV-OPV routine schedule would save USD 14.52 per vaccinated child, and changing to a full IPV routine schedule would save USD 9.41 per vaccinated child.
1997-06-28
STS-94 Pilot Susan Leigh Still arrives at the Shuttle Landing Facility aboard a T-38 jet in preparation for the reflight of the Microgravity Science Laboratory-1 mission. Launch is scheduled for July 1, 1997, at 2:37 p.m. EDT. The laboratory was scheduled to fly again with the full complement of STS-83 experiments after that mission was cut short due to a faulty fuel cell. During the scheduled 16-day STS-94 mission, the experiments will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the flight crew conducts combustion, protein crystal growth and materials processing experiments