Sample records for process appendixes include

  1. Petroleum Market Model of the National Energy Modeling System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-01-01

    The purpose of this report is to define the objectives of the Petroleum Market Model (PMM), describe its basic approach, and provide detail on how it works. This report is intended as a reference document for model analysts, users, and the public. The PMM models petroleum refining activities, the marketing of petroleum products to consumption regions. The production of natural gas liquids in gas processing plants, and domestic methanol production. The PMM projects petroleum product prices and sources of supply for meeting petroleum product demand. The sources of supply include crude oil, both domestic and imported; other inputs including alcoholsmore » and ethers; natural gas plant liquids production; petroleum product imports; and refinery processing gain. In addition, the PMM estimates domestic refinery capacity expansion and fuel consumption. Product prices are estimated at the Census division level and much of the refining activity information is at the Petroleum Administration for Defense (PAD) District level. This report is organized as follows: Chapter 2, Model Purpose; Chapter 3, Model Overview and Rationale; Chapter 4, Model Structure; Appendix A, Inventory of Input Data, Parameter Estimates, and Model Outputs; Appendix B, Detailed Mathematical Description of the Model; Appendix C, Bibliography; Appendix D, Model Abstract; Appendix E, Data Quality; Appendix F, Estimation methodologies; Appendix G, Matrix Generator documentation; Appendix H, Historical Data Processing; and Appendix I, Biofuels Supply Submodule.« less

  2. RMP Guidance for Warehouses - Appendix D: OSHA Guidance on PSM

    EPA Pesticide Factsheets

    This text is taken directly from OSHA's appendix C to the Process Safety Management standard (29 CFR 1910.119). Compiled information required by this standard, including material safety data sheets (MSDS), is essential to process hazards analysis (PHA).

  3. Attentional Processes in Children's Learning. Appendix A: Project Papers.

    ERIC Educational Resources Information Center

    White, Sheldon H.

    This appendix includes seven papers which focus on various aspects of the learning processes of children ages 5-7: (1) S. Thompson, "Transitions to concrete operations: A survey of Piaget's writings" (in outline form); (2) S. H. White, "Changes in learning processes in the late preschool years," an examination of cross-cultural…

  4. Breckinridge Project, initial effort. Report XI, Volume V. Critical review of the design basis. [Critical review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1982-01-01

    Report XI, Technical Audit, is a compendium of research material used during the Initial Effort in making engineering comparisons and decisions. Volumes 4 and 5 of Report XI present those studies which provide a Critical Review of the Design Basis. The Critical Review Report, prepared by Intercontinental Econergy Associates, Inc., summarizes findings from an extensive review of the data base for the H-Coal process design. Volume 4 presents this review and assessment, and includes supporting material; specifically, Design Data Tabulation (Appendix A), Process Flow Sheets (Appendix B), and References (Appendix C). Volume 5 is a continuation of the references ofmore » Appendix C. Studies of a proprietary nature are noted and referenced, but are not included in these volumes. They are included in the Limited Access versions of these reports and may be reviewed by properly cleared personnel in the offices of Ashland Synthetic Fuels, Inc.« less

  5. Operational Control Procedures for the Activated Sludge Process: Appendix.

    ERIC Educational Resources Information Center

    West, Alfred W.

    This document is the appendix for a series of documents developed by the National Training and Operational Technology Center describing operational control procedures for the activated sludge process used in wastewater treatment. Categories discussed include: control test data, trend charts, moving averages, semi-logarithmic plots, probability…

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Szluha, A.T.; Summers, J.R.; Nicholas, W.D.

    Current response technologies for floating hazardous chemicals were organized into a response manual. Technologies for spill containment, vapor suppression, and spill removal were included. A decision-making process was developed and work sheets included in an appendix. Physical properties and response information are also included in an appendix for each of the floating CHRIS chemicals. This information has been organized into a computerized data base for easy access.

  7. General RMP Guidance - Appendix D: OSHA Guidance on PSM

    EPA Pesticide Factsheets

    OSHA's Process Safety Management (PSM) Guidance on providing complete and accurate written information concerning process chemicals, process technology, and process equipment; including process hazard analysis and material safety data sheets.

  8. RMP Guidance for Chemical Distributors - Appendix D: OSHA Guidance on PSM

    EPA Pesticide Factsheets

    Guidance on the Process Safety Management standard says information (including MSDS) about chemicals, including process intermediates, must enable accurate assessment of fire/explosion characteristics, reactivity hazards, and corrosing/erosion effects.

  9. 32 CFR Appendix D to Part 282 - Processing a Claim

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Processing a Claim D Appendix D to Part 282.... 282, App. D Appendix D to Part 282—Processing a Claim (a) Initial Component Processing. Upon receipt... apply for a waiver. (Paragraph (d) of this Appendix explains which claims qualify and the procedures for...

  10. 10 CFR Appendix A to Part 725 - Categories of Restricted Data Available

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... and radiation studies. b. Chemistry, chemical engineering and radiochemistry of all the elements and their compounds. Included are techniques and processes of chemical separations, radioactive waste..., including chemical engineering, processes and techniques. Reactor physics, engineering and criticality...

  11. 40 CFR Appendix A to Part 419 - Processes Included in the Determination of BAT Effluent Limitations for Total Chromium...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 29 2011-07-01 2009-07-01 true Processes Included in the Determination of BAT Effluent Limitations for Total Chromium, Hexavalent Chromium, and Phenolic Compounds (4AAP) A...—Processes Included in the Determination of BAT Effluent Limitations for Total Chromium, Hexavalent Chromium...

  12. 40 CFR Appendix A to Part 419 - Processes Included in the Determination of BAT Effluent Limitations for Total Chromium...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 28 2010-07-01 2010-07-01 true Processes Included in the Determination of BAT Effluent Limitations for Total Chromium, Hexavalent Chromium, and Phenolic Compounds (4AAP) A...—Processes Included in the Determination of BAT Effluent Limitations for Total Chromium, Hexavalent Chromium...

  13. 40 CFR Appendix A to Part 419 - Processes Included in the Determination of BAT Effluent Limitations for Total Chromium...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 29 2014-07-01 2012-07-01 true Processes Included in the Determination of BAT Effluent Limitations for Total Chromium, Hexavalent Chromium, and Phenolic Compounds (4AAP) A...—Processes Included in the Determination of BAT Effluent Limitations for Total Chromium, Hexavalent Chromium...

  14. 40 CFR Appendix A to Part 419 - Processes Included in the Determination of BAT Effluent Limitations for Total Chromium...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 30 2012-07-01 2012-07-01 false Processes Included in the Determination of BAT Effluent Limitations for Total Chromium, Hexavalent Chromium, and Phenolic Compounds (4AAP... Part 419—Processes Included in the Determination of BAT Effluent Limitations for Total Chromium...

  15. Global mineral resource assessment: porphyry copper assessment of Mexico: Chapter A in Global mineral resource assessment

    USGS Publications Warehouse

    Hammarstrom, Jane M.; Robinson, Gilpin R.; Ludington, Steve; Gray, Floyd; Drenth, Benjamin J.; Cendejas-Cruz, Francisco; Espinosa, Enrique; Pérez-Segura, Efrén; Valencia-Moreno, Martín; Rodríguez-Castañeda, José Luis; Vásquez-Mendoza, Rigobert; Zürcher, Lukas

    2010-01-01

    This report includes a brief overview of porphyry copper deposits in Mexico, a description of the assessment process used, a summary of results, and appendixes. Appendixes A through K contain summary information for each tract, as follows: location, the geologic feature assessed, the rationale for tract delineation, tables and descriptions of known deposits and significant prospects, exploration history, model selection, rationale for the estimates, assessment results, and references. The accompanying digital map files (shapefiles) provide permissive tract outlines, assessment results, and data for deposits and prospects in a GIS format (appendix L).

  16. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix J: Recreation.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Columbia River System Operation Review

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.

  17. VARIATIONS IN INSTRUCTIONAL MEDIA, PROCESSES, CONTENT AND APTITUDE VARIABLES IN RELATION TO EFFICIENCY OF COGNITIVE GOAL ATTAINMENT, VOLUME 2.

    ERIC Educational Resources Information Center

    FATTU, N.A.

    THE REPORT, THE SECOND OF A SERIES (ACCESSION NUMBERS ED 003 239 THROUGH ED 003 241), INCLUDES SEVEN APPENDIXES TO AN EARLIER STUDY. THE APPENDIXES ARE TITLED, (1) PROBLEMS OF MEANING AND REFERENCE IN BLOOM'S TAXONOMY, (2) SCALE FOR APPRAISING A MODEL, (3) EXPLORATION OF INTERACTIONS AMONG INSTRUCTIONAL CONTENT AND APTITUDE VARIABLES, (4) AN…

  18. 49 CFR Appendix A to Part 580 - Secure Printing Processes and Other Secure Processes

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Secure Printing Processes and Other Secure Processes A Appendix A to Part 580 Transportation Other Regulations Relating to Transportation (Continued... DISCLOSURE REQUIREMENTS Pt. 580, App. A Appendix A to Part 580—Secure Printing Processes and Other Secure...

  19. 49 CFR Appendix A to Part 580 - Secure Printing Processes and Other Secure Processes

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Secure Printing Processes and Other Secure Processes A Appendix A to Part 580 Transportation Other Regulations Relating to Transportation (Continued... DISCLOSURE REQUIREMENTS Pt. 580, App. A Appendix A to Part 580—Secure Printing Processes and Other Secure...

  20. 49 CFR Appendix A to Part 580 - Secure Printing Processes and Other Secure Processes

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Secure Printing Processes and Other Secure Processes A Appendix A to Part 580 Transportation Other Regulations Relating to Transportation (Continued... DISCLOSURE REQUIREMENTS Pt. 580, App. A Appendix A to Part 580—Secure Printing Processes and Other Secure...

  1. 49 CFR Appendix A to Part 580 - Secure Printing Processes and Other Secure Processes

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Secure Printing Processes and Other Secure Processes A Appendix A to Part 580 Transportation Other Regulations Relating to Transportation (Continued... DISCLOSURE REQUIREMENTS Pt. 580, App. A Appendix A to Part 580—Secure Printing Processes and Other Secure...

  2. An Investigation of Synthetic Aperture Radar Autofocus,

    DTIC Science & Technology

    1985-04-01

    uniform straight line motion of the aircraft. Unknown aircraft motions alter the matched filter required for processing . Autofocussing involves determi...REFERENCES APPENDIX 1 RESOLUTION OF SAR APPENDIX 2 AIRCRAFT MOTION TOLERANCE APPENDIX 3 INITIAL RESOLUTION FOR FOLLOW-DOWN PROCESSING APPENDIX 4 DEPENDENCE OF...Range resolution is achieved using on-board pulse-compression techniques, while azimuth processing is currently done at RSRE on a Marconi hardware

  3. 40 CFR Appendix A to Part 419 - Processes Included in the Determination of BAT Effluent Limitations for Total Chromium...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Hydrotreating Asphalt Processes 18. Asphalt Production 32. 200 °F Softening Point Unfluxed Asphalt 43. Asphalt Oxidizing 89. Asphalt Emulsifying Lube Processes 21. Hydrofining, Hydrofinishing, Lube Hydrofining 22. White...

  4. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix C: Anadromous Fish and Juvenile Fish Transportation.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Columbia River System Operation Review

    1995-11-01

    This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings.

  5. Proceedings: An international workshop on offshore lease abandonment and platform disposal: Technology, regulation, and environmental effects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pulsipher, A.

    This Proceedings volume includes papers prepared for an international workshop on lease abandonment and offshore platform disposal. The workshop was held April 15, 16, and 17, 1996, in New Orleans, Louisiana. Included in the volume are several plenary speeches and issue papers. prepared by six working groups, who discussed: Abandoning Wells; Abandoning Pipelines; Removing Facilities; Site Clearance; Habitat Management, Maintenance, and Planning; and Regulation and Policy. Also included are an introduction, an afterword (reprinted with the permission of its author, John Lohrenz), and, as Appendix C, the complete report of the National Research Council Marine Boards An Assessment of Techniquesmore » for Removing Fixed Offshore Structures, around which much of the discussion at the workshop was organized. Short biographies of many speakers, organizers, and chairpersons are included as Appendix A. Appendix B is a list of conference participants. Selected papers have been processes separately for inclusion in the Energy Science and Technology database.« less

  6. Coastal and Marine Bird Data Base

    USGS Publications Warehouse

    Anderson, S.H.; Geissler, P.H.; Dawson, D.K.

    1980-01-01

    Summary: This report discusses the development of a coastal and marine bird data base at the Migratory Bird and Habitat Research Laboratory. The system is compared with other data bases, and suggestions for future development, such as possible adaptations for other taxonomic groups, are included. The data base is based on the Statistical Analysis System but includes extensions programmed in PL/I. The Appendix shows how the system evolved. Output examples are given for heron data and pelagic bird data which indicate the types of analyses that can be conducted and output figures. The Appendixes include a retrieval language user's guide and description of the retrieval process and listing of translator program.

  7. Stirling Space Engine Program. Volume 2; Appendixes A, B, C and D

    NASA Technical Reports Server (NTRS)

    Dhar, Manmohan

    1999-01-01

    The objective of this program was to develop the technology necessary for operating Stirling power converters in a space environment and to demonstrate this technology in full-scale engine tests. Volume 2 of the report includes the following appendices: Appendix A: Heater Head Development (Starfish Heater Head Program, 1/10th Segment and Full-Scale Heat Pipes, and Sodium Filling and Processing); Appendix B: Component Test Power Converter (CTPC) Component Development (High-temperature Organic Materials, Heat Exchanger Fabrication, Beryllium Issues, Sodium Issues, Wear Couple Tests, Pressure Boundary Penetrations, Heating System Heaters, and Cooler Flow Test); Appendix C: Udimet Testing (Selection of the Reference Material for the Space Stirling Engine Heater Head, Udimet 720LI Creep Test Result Update, Final Summary of Space Stirling Endurance Engine Udimet 720L1 Fatigue Testing Results, Udimet 720l1 Weld Development Summary, and Udimet 720L1 Creep Test Final Results Summary), and Appendix D: CTPC Component Development Photos.

  8. 33 CFR Appendix C to Part 331 - Administrative Appeal Process for Approved Jurisdictional Determinations

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Approved Jurisdictional Determinations C Appendix C to Part 331 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE APPEAL PROCESS Pt. 331, App. C Appendix C to Part 331—Administrative Appeal Process for Approved Jurisdictional Determinations ER28MR00...

  9. 33 CFR Appendix C to Part 331 - Administrative Appeal Process for Approved Jurisdictional Determinations

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Approved Jurisdictional Determinations C Appendix C to Part 331 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE APPEAL PROCESS Pt. 331, App. C Appendix C to Part 331—Administrative Appeal Process for Approved Jurisdictional Determinations ER28MR00...

  10. 33 CFR Appendix C to Part 331 - Administrative Appeal Process for Approved Jurisdictional Determinations

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Approved Jurisdictional Determinations C Appendix C to Part 331 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE APPEAL PROCESS Pt. 331, App. C Appendix C to Part 331—Administrative Appeal Process for Approved Jurisdictional Determinations ER28MR00...

  11. 12 CFR Appendix A to Part 343 - Consumer Grievance Process

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 4 2011-01-01 2011-01-01 false Consumer Grievance Process A Appendix A to Part... POLICY CONSUMER PROTECTION IN SALES OF INSURANCE Pt. 343, App. A Appendix A to Part 343—Consumer Grievance Process Any consumer who believes that any bank or any other person selling, soliciting...

  12. 32 CFR Appendix E to Part 284 - Processing a Waiver Application When the Debt Is More Than $1,500

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... More Than $1,500 E Appendix E to Part 284 National Defense Department of Defense (Continued) OFFICE OF... ERRONEOUS PAYMENTS OF PAY AND ALLOWANCES Pt. 284, App. E Appendix E to Part 284—Processing a Waiver... administrative report (as explained in paragraphs D and E to this Appendix) with the application. B. Untimely...

  13. 32 CFR Appendix D to Part 284 - Processing a Waiver Application When the Debt Is $1,500 or Less

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... $1,500 or Less D Appendix D to Part 284 National Defense Department of Defense (Continued) OFFICE OF... ERRONEOUS PAYMENTS OF PAY AND ALLOWANCES Pt. 284, App. D Appendix D to Part 284—Processing a Waiver... the procedures in paragraph D to this Appendix. In addition, if the determining official finds that...

  14. 12 CFR Appendix A to Part 14 - Consumer Grievance Process

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Consumer Grievance Process A Appendix A to Part 14 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY CONSUMER PROTECTION IN SALES OF INSURANCE Pt. 14, App. A Appendix A to Part 14—Consumer Grievance Process Any consumer who...

  15. 12 CFR Appendix A to Part 536 - Consumer Grievance Process

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Consumer Grievance Process A Appendix A to Part 536 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY CONSUMER PROTECTION IN SALES OF INSURANCE Pt. 536, App. A Appendix A to Part 536—Consumer Grievance Process Any consumer who...

  16. 41 CFR Appendix C to Part 60 - 250-Review of Personnel Processes

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true 250-Review of Personnel Processes C Appendix C to Part 60 Public Contracts and Property Management Other Provisions Relating to... PROTECTED VETERANS Pt. 60-250, App. C Appendix C to Part 60-250—Review of Personnel Processes The following...

  17. 41 CFR Appendix C to Part 60 - 250-Review of Personnel Processes

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false 250-Review of Personnel Processes C Appendix C to Part 60 Public Contracts and Property Management Other Provisions Relating to... PROTECTED VETERANS Pt. 60-250, App. C Appendix C to Part 60-250—Review of Personnel Processes The following...

  18. 44 CFR Appendix A to Part 9 - Decision-making Process for E.O. 11988

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Decision-making Process for E.O. 11988 A Appendix A to Part 9 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT..., App. A Appendix A to Part 9—Decision-making Process for E.O. 11988 EC02FE91.074 ...

  19. 41 CFR Appendix C to Part 60 - 250-Review of Personnel Processes

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true 250-Review of Personnel Processes C Appendix C to Part 60 Public Contracts and Property Management Other Provisions Relating to... PROTECTED VETERANS Pt. 60-250, App. C Appendix C to Part 60-250—Review of Personnel Processes The following...

  20. 41 CFR Appendix C to Part 60 - 300-Review of Personnel Processes

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true 300-Review of Personnel Processes C Appendix C to Part 60 Public Contracts and Property Management Other Provisions Relating to... MEDAL VETERANS Pt. 60-300, App. C Appendix C to Part 60-300—Review of Personnel Processes The following...

  1. 23 CFR Appendix D to Subpart D of... - Equal Opportunity Compliance Review Process Flow Chart

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Equal Opportunity Compliance Review Process Flow Chart D Appendix D to Subpart D of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION..., Subpt. D, App. D Appendix D to Subpart D of Part 230—Equal Opportunity Compliance Review Process Flow...

  2. 41 CFR Appendix C to Part 60 - 300-Review of Personnel Processes

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true 300-Review of Personnel Processes C Appendix C to Part 60 Public Contracts and Property Management Other Provisions Relating to... MEDAL VETERANS Pt. 60-300, App. C Appendix C to Part 60-300—Review of Personnel Processes The following...

  3. 41 CFR Appendix C to Part 60 - 250-Review of Personnel Processes

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true 250-Review of Personnel Processes C Appendix C to Part 60 Public Contracts and Property Management Other Provisions Relating to... PROTECTED VETERANS Pt. 60-250, App. C Appendix C to Part 60-250—Review of Personnel Processes The following...

  4. 12 CFR Appendix A to Part 14 - Consumer Grievance Process

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 1 2011-01-01 2011-01-01 false Consumer Grievance Process A Appendix A to Part 14 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY CONSUMER PROTECTION IN SALES OF INSURANCE Pt. 14, App. A Appendix A to Part 14—Consumer Grievance Process Any consumer who...

  5. Process Synchronization and Data Communication between Processes in Real Time Local Area Networks.

    DTIC Science & Technology

    1985-12-01

    52 APPENDIX A: PROCEDURE MAKETABLE .............. 54 APPENDIX B: PROCEDURE MAKEMESSAGE ............. 56 APPENDIX C: PROCEDURE...item. The relation table is built by the driver during system initialization by the procedure maketable , see Appendix A. This procedure reads the file... MAKETABLE Procedure maketable is the first procedure called by the driver. It sets up the relation table in local RAM of SBC 1 by reading the information

  6. STS-56, RSRM-031, 360L031 KSC processing configuration and data report

    NASA Technical Reports Server (NTRS)

    1993-01-01

    KSC Processing Configuration and Data Report is being provided as a historical document and as an enhancement to future RSRM manufacturing and processing operations. The following sections provide information on segment receipt, aft booster build-up, booster assembly, and closeout for STS-56, RSRM flight set 36OL031. Section 2.0 contains a summary of RSRM-031 processing. Section 3.0 discusses any significant problems or special issues that require special attention. Sections 4.0 through 6.0 contain narrative descriptions of all key events, including any related processing problems. Appendix A provides engineering specifications and changes. A list and matrix of all problem reports (PR's) pertinent to this flight set is provided in Appendix B. The matrix was provided by the Thiokol LSS Quality Engineering office. Copies of the PR's generated during the processing of RSRM-031 will be provided upon request. Appendix C contains the motor set status matrix, which provides milestone dates for the RSRM-031 flow. Section 7.0 provides recommendations, if any, for the improvement of flight hardware processing. Section 8.0 contains data sheets that provide flight hardware parts and consumables information installed during the booster build-up and stacking operations by location, lot/serial number, expiration and cure dates/times, and installation dates.

  7. STS-51, RSRM-033, 360T033 KSC processing configuration and data report

    NASA Technical Reports Server (NTRS)

    Hillard, Robert C.

    1993-01-01

    KSC Processing Configuration and Data Report is being provided as a historical document and as an enhancement to future RSRM manufacturing and processing operations. The following sections provide information on segment receipt, aft booster build up, motor assembly, and closeout for STS-51, RSRM flight set 360T033. Section 2.0 contains a summary of RSRM-033 processing. Section 3.0 discusses any significant problems or special issues that require special attention. Sections 4.0 through 6.0 contain narrative descriptions of all key events, including any related processing problems. Appendix A provides engineering specifications and changes. A list and matrix of all problem reports (PR's) pertinent to this flight set is provided in Appendix B. The matrix was provided by the Thiokol LSS Quality Engineering office. Copies of the PR's generated during the processing of RSRM-033 will be provided upon request. Appendix C contains the motor set status matrix, which provides milestone dates for the RSRM-033 flow. Section 7.0 provides recommendations for the improvement of flight hardware processing. Section 8.0 contains data sheets that provide flight hardware parts and consumable information installed during the booster build-up and stacking operations by location, lot/serial number, expiration and cure dates/times, and installation dates.

  8. 14 CFR Appendix H to Part 141 - Ground Instructor Certification Course

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) Ground training must include the following aeronautical knowledge areas: (1) Learning process; (2) Elements of effective teaching; (3) Student evaluation and testing; (4) Course development; (5) Lesson...

  9. 14 CFR Appendix H to Part 141 - Ground Instructor Certification Course

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) Ground training must include the following aeronautical knowledge areas: (1) Learning process; (2) Elements of effective teaching; (3) Student evaluation and testing; (4) Course development; (5) Lesson...

  10. 14 CFR Appendix H to Part 141 - Ground Instructor Certification Course

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) Ground training must include the following aeronautical knowledge areas: (1) Learning process; (2) Elements of effective teaching; (3) Student evaluation and testing; (4) Course development; (5) Lesson...

  11. Numerical Solution of Laminar and Turbulent Boundary Layer Equations Including Transition, and Experimenmtal Study of a Flat Plate with a Blunt Fin at Incidence.

    DTIC Science & Technology

    1986-03-01

    93 3.6.5.4 Data Acquisition- Electrical Analog. . 95 3.6.6 Co-axial Thermocouple Gages ...... 97 3.6.6.1 Theory .................... 101 3.6.6.2...Preparation of Liquid Crystal Model . . . 233 Appendix G: Digital Image Processing . ........ 235 Appendix H: Electrical Analog Circuits ....... . 237...m. 232 H.la Thermal Circuit ..... ................. . 237 H.Ib Electrical Circuit ..... ............... 237 H.2 Electrical Analog Using Equal Sections

  12. 10 CFR Appendix I to Part 110 - Illustrative List of Reprocessing Plant Components Under NRC Export Licensing Authority

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... transuranic elements. Different technical processes can accomplish this separation. However, over the years Purex has become the most commonly used and accepted process. Purex involves the dissolution of... facilities have process functions similar to each other, including: irradiated fuel element chopping, fuel...

  13. 49 CFR Appendix C- to Part 544... - Appendix C- to Part 544 Motor Vehicle Rental and Leasing Companies (Including Licensees and...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Appendix C- to Part 544 Motor Vehicle Rental and Leasing Companies (Including Licensees and Franchisees) Subject to the Reporting Requirements of Part 544 C Appendix C- to Part 544 Motor Vehicle Rental and Leasing Companies (Including Licensees and...

  14. Image Guidance

    EPA Pesticide Factsheets

    Guidance that explains the process for getting images approved in One EPA Web microsites and resource directories. includes an appendix that shows examples of what makes some images better than others, how some images convey meaning more than others

  15. 12 CFR Appendix A to Part 343 - Consumer Grievance Process

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... POLICY CONSUMER PROTECTION IN SALES OF INSURANCE Pt. 343, App. A Appendix A to Part 343—Consumer... Consumer Protection (DSC), Federal Deposit Insurance Corporation, at the following address: 550 17th Street... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Consumer Grievance Process A Appendix A to Part...

  16. Functional Integration

    NASA Astrophysics Data System (ADS)

    Cartier, Pierre; DeWitt-Morette, Cecile

    2006-11-01

    Acknowledgements; List symbols, conventions, and formulary; Part I. The Physical and Mathematical Environment: 1. The physical and mathematical environment; Part II. Quantum Mechanics: 2. First lesson: gaussian integrals; 3. Selected examples; 4. Semiclassical expansion: WKB; 5. Semiclassical expansion: beyond WKB; 6. Quantum dynamics: path integrals and operator formalism; Part III. Methods from Differential Geometry: 7. Symmetries; 8. Homotopy; 9. Grassmann analysis: basics; 10. Grassmann analysis: applications; 11. Volume elements, divergences, gradients; Part IV. Non-Gaussian Applications: 12. Poisson processes in physics; 13. A mathematical theory of Poisson processes; 14. First exit time: energy problems; Part V. Problems in Quantum Field Theory: 15. Renormalization 1: an introduction; 16. Renormalization 2: scaling; 17. Renormalization 3: combinatorics; 18. Volume elements in quantum field theory Bryce DeWitt; Part VI. Projects: 19. Projects; Appendix A. Forward and backward integrals: spaces of pointed paths; Appendix B. Product integrals; Appendix C. A compendium of gaussian integrals; Appendix D. Wick calculus Alexander Wurm; Appendix E. The Jacobi operator; Appendix F. Change of variables of integration; Appendix G. Analytic properties of covariances; Appendix H. Feynman's checkerboard; Bibliography; Index.

  17. Functional Integration

    NASA Astrophysics Data System (ADS)

    Cartier, Pierre; DeWitt-Morette, Cecile

    2010-06-01

    Acknowledgements; List symbols, conventions, and formulary; Part I. The Physical and Mathematical Environment: 1. The physical and mathematical environment; Part II. Quantum Mechanics: 2. First lesson: gaussian integrals; 3. Selected examples; 4. Semiclassical expansion: WKB; 5. Semiclassical expansion: beyond WKB; 6. Quantum dynamics: path integrals and operator formalism; Part III. Methods from Differential Geometry: 7. Symmetries; 8. Homotopy; 9. Grassmann analysis: basics; 10. Grassmann analysis: applications; 11. Volume elements, divergences, gradients; Part IV. Non-Gaussian Applications: 12. Poisson processes in physics; 13. A mathematical theory of Poisson processes; 14. First exit time: energy problems; Part V. Problems in Quantum Field Theory: 15. Renormalization 1: an introduction; 16. Renormalization 2: scaling; 17. Renormalization 3: combinatorics; 18. Volume elements in quantum field theory Bryce DeWitt; Part VI. Projects: 19. Projects; Appendix A. Forward and backward integrals: spaces of pointed paths; Appendix B. Product integrals; Appendix C. A compendium of gaussian integrals; Appendix D. Wick calculus Alexander Wurm; Appendix E. The Jacobi operator; Appendix F. Change of variables of integration; Appendix G. Analytic properties of covariances; Appendix H. Feynman's checkerboard; Bibliography; Index.

  18. Human Factors Process Task Analysis Liquid Oxygen Pump Acceptance Test Procedure for the Advanced Technology Development Center

    NASA Technical Reports Server (NTRS)

    Diorio, Kimberly A.

    2002-01-01

    A process task analysis effort was undertaken by Dynacs Inc. commencing in June 2002 under contract from NASA YA-D6. Funding was provided through NASA's Ames Research Center (ARC), Code M/HQ, and Industrial Engineering and Safety (IES). The John F. Kennedy Space Center (KSC) Engineering Development Contract (EDC) Task Order was 5SMA768. The scope of the effort was to conduct a Human Factors Process Failure Modes and Effects Analysis (HF PFMEA) of a hazardous activity and provide recommendations to eliminate or reduce the effects of errors caused by human factors. The Liquid Oxygen (LOX) Pump Acceptance Test Procedure (ATP) was selected for this analysis. The HF PFMEA table (see appendix A) provides an analysis of six major categories evaluated for this study. These categories include Personnel Certification, Test Procedure Format, Test Procedure Safety Controls, Test Article Data, Instrumentation, and Voice Communication. For each specific requirement listed in appendix A, the following topics were addressed: Requirement, Potential Human Error, Performance-Shaping Factors, Potential Effects of the Error, Barriers and Controls, Risk Priority Numbers, and Recommended Actions. This report summarizes findings and gives recommendations as determined by the data contained in appendix A. It also includes a discussion of technology barriers and challenges to performing task analyses, as well as lessons learned. The HF PFMEA table in appendix A recommends the use of accepted and required safety criteria in order to reduce the risk of human error. The items with the highest risk priority numbers should receive the greatest amount of consideration. Implementation of the recommendations will result in a safer operation for all personnel.

  19. Advanced technology applications for second and third generation coal gasification systems. Appendix

    NASA Technical Reports Server (NTRS)

    Bradford, R.; Hyde, J. D.; Mead, C. W.

    1980-01-01

    Sixteen coal conversion processes are described and their projected goals listed. Tables show the reactants used, products derived, typical operating data, and properties of the feed coal. A history of the development of each process is included along with a drawing of the chemical reactor used.

  20. 33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Appendix A to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. A Appendix A to Part 230—Processing... integrating the draft EIS or EA and draft FONSI (as appropriate), or a separate NEPA document and circulate it...

  1. 33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Appendix A to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. A Appendix A to Part 230—Processing... integrating the draft EIS or EA and draft FONSI (as appropriate), or a separate NEPA document and circulate it...

  2. 33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Appendix A to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. A Appendix A to Part 230—Processing... integrating the draft EIS or EA and draft FONSI (as appropriate), or a separate NEPA document and circulate it...

  3. 33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Appendix A to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. A Appendix A to Part 230—Processing... integrating the draft EIS or EA and draft FONSI (as appropriate), or a separate NEPA document and circulate it...

  4. 41 CFR Appendix C to Part 60 - 300-Review of Personnel Processes

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 1 2014-07-01 2014-07-01 false 300-Review of Personnel Processes C Appendix C to Part 60 Public Contracts and Property Management Other Provisions Relating to... VETERANS, AND ARMED FORCES SERVICE MEDAL VETERANS Pt. 60-300, App. C Appendix C to Part 60-300—Review of...

  5. 41 CFR Appendix C to Part 60 - 741-Review of Personnel Processes

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true 741-Review of Personnel Processes C Appendix C to Part 60 Public Contracts and Property Management Other Provisions Relating to... REGARDING INDIVIDUALS WITH DISABILITIES Pt. 60-741, App. C Appendix C to Part 60-741—Review of Personnel...

  6. 41 CFR Appendix C to Part 60 - 741-Review of Personnel Processes

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true 741-Review of Personnel Processes C Appendix C to Part 60 Public Contracts and Property Management Other Provisions Relating to... REGARDING INDIVIDUALS WITH DISABILITIES Pt. 60-741, App. C Appendix C to Part 60-741—Review of Personnel...

  7. Columbia Accident Investigation Board Report. Volume Two

    NASA Technical Reports Server (NTRS)

    Barry, J. R.; Jenkins, D. R.; White, D. J.; Goodman, P. A.; Reingold, L. A.

    2003-01-01

    Volume II of the Report contains appendices that were cited in Volume I. The Columbia Accident Investigation Board produced many of these appendices as working papers during the investigation into the February 1, 2003 destruction of the Space Shuttle Columbia. Other appendices were produced by other organizations (mainly NASA) in support of the Board investigation. In the case of documents that have been published by others, they are included here in the interest of establishing a complete record, but often at less than full page size. Contents include: CAIB Technical Documents Cited in the Report: Reader's Guide to Volume II; Appendix D. a Supplement to the Report; Appendix D.b Corrections to Volume I of the Report; Appendix D.1 STS-107 Training Investigation; Appendix D.2 Payload Operations Checklist 3; Appendix D.3 Fault Tree Closure Summary; Appendix D.4 Fault Tree Elements - Not Closed; Appendix D.5 Space Weather Conditions; Appendix D.6 Payload and Payload Integration; Appendix D.7 Working Scenario; Appendix D.8 Debris Transport Analysis; Appendix D.9 Data Review and Timeline Reconstruction Report; Appendix D.10 Debris Recovery; Appendix D.11 STS-107 Columbia Reconstruction Report; Appendix D.12 Impact Modeling; Appendix D.13 STS-107 In-Flight Options Assessment; Appendix D.14 Orbiter Major Modification (OMM) Review; Appendix D.15 Maintenance, Material, and Management Inputs; Appendix D.16 Public Safety Analysis; Appendix D.17 MER Manager's Tiger Team Checklist; Appendix D.18 Past Reports Review; Appendix D.19 Qualification and Interpretation of Sensor Data from STS-107; Appendix D.20 Bolt Catcher Debris Analysis.

  8. Geology and undiscovered resource assessment of the potash-bearing Central Asia Salt Basin, Turkmenistan, Uzbekistan, Tajikistan, and Afghanistan: Chapter AA in Global mineral resource assessment

    USGS Publications Warehouse

    Wynn, Jeff; Orris, Greta J.; Dunlap, Pamela; Cocker, Mark D.; Bliss, James D.

    2016-03-23

    Chapter 1 of this report provides an overview of the history of the CASB and summarizes evaporite potash deposition, halokinesis, and dissolution processes that have affected the current distribution of potash-bearing salt in the CASB. Chapter 2 describes the Gissar tract, an uplifted region that contains a mix of stratabound and halokinetic potash deposits and all of the discovered and exploited potash deposits of the CASB. Chapter 3 describes the Amu Darya tract, where evaporite deposits remain flat-lying and undeformed since their original deposition. Chapter 4 describes the highly deformed and compressed Afghan-Tajik tract and what is known of the deeply-buried Jurassic salt. Chapter 5 describes the spatial databases included with this report, which contain a collection of CASB potash information. Appendixes A and B summarize descriptive models for stratabound and halokinetic potash-bearing salt deposits, respectively. Appendix C summarizes the AGE method used to evaluate the Gissar and Amu Darya tracts. Appendixes D and E contain grade and thickness data for the Gissar and Amu Darya tracts. Appendix F provides the SYSTAT script used to estimate undiscovered K2 O in a CASB tract. Appendix G provides a potash glossary, and appendix H provides biographies of assessment participants.

  9. 40 CFR Appendix S to Part 51 - Emission Offset Interpretative Ruling

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... included in NAICS codes 325193 or 312140; (u) Fossil-fuel boilers (or combination thereof) totaling more... fiber processing plants; (y) Charcoal production plants; (z) Fossil fuel-fired steam electric plants of... and PM10 emissions shall include gaseous emissions from a source or activity which condense to form...

  10. 40 CFR Appendix S to Part 51 - Emission Offset Interpretative Ruling

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... included in NAICS codes 325193 or 312140; (u) Fossil-fuel boilers (or combination thereof) totaling more... fiber processing plants; (y) Charcoal production plants; (z) Fossil fuel-fired steam electric plants of... and PM10 emissions shall include gaseous emissions from a source or activity which condense to form...

  11. 40 CFR Appendix S to Part 51 - Emission Offset Interpretative Ruling

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... included in NAICS codes 325193 or 312140; (u) Fossil-fuel boilers (or combination thereof) totaling more... fiber processing plants; (y) Charcoal production plants; (z) Fossil fuel-fired steam electric plants of... and PM10 emissions shall include gaseous emissions from a source or activity which condense to form...

  12. 10 CFR Appendix III to Part 960 - Application of the System and Technical Guidelines During the Siting Process

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Application of the System and Technical Guidelines During the Siting Process III Appendix III to Part 960 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Pt. 960, App. III Appendix III to Part...

  13. 10 CFR Appendix III to Part 960 - Application of the System and Technical Guidelines During the Siting Process

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Application of the System and Technical Guidelines During the Siting Process III Appendix III to Part 960 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Pt. 960, App. III Appendix III to Part...

  14. 10 CFR Appendix III to Part 960 - Application of the System and Technical Guidelines During the Siting Process

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Application of the System and Technical Guidelines During the Siting Process III Appendix III to Part 960 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Pt. 960, App. III Appendix III to Part...

  15. 10 CFR Appendix III to Part 960 - Application of the System and Technical Guidelines During the Siting Process

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Application of the System and Technical Guidelines During the Siting Process III Appendix III to Part 960 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Pt. 960, App. III Appendix III to Part...

  16. 32 CFR Appendix D to Part 113 - Sample DD Form 2654, “Involuntary Allotment Notice and Processing”

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Sample DD Form 2654, âInvoluntary Allotment Notice and Processingâ D Appendix D to Part 113 National Defense Department of Defense OFFICE OF THE..., App. D Appendix D to Part 113—Sample DD Form 2654, “Involuntary Allotment Notice and Processing...

  17. General RMP Guidance - Appendix C: Technical Assistance

    EPA Pesticide Factsheets

    Contacts for resources available to facilities in complying with 40 CFR part 68 (risk management program) include Office of Emergency Prevention Preparedness and Response, EPCRA/Superfund/RCRA/CAA Call Center, and the Center for Chemical Process Safety.

  18. 47 CFR Appendix A to Part 64 - Telecommunications Service Priority (TSP) System for National Security Emergency Preparedness (NSEP)

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., emission, or reception of signals, signs, writing, images, sounds, or intelligence of any nature, by wire... System which includes: (a) Receiving, processing, and evaluating requests for priority actions from... doubt. However, processing of Emergency NSEP service requests will not be delayed for verification...

  19. 47 CFR Appendix A to Part 64 - Telecommunications Service Priority (TSP) System for National Security Emergency Preparedness (NSEP)

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., emission, or reception of signals, signs, writing, images, sounds, or intelligence of any nature, by wire... System which includes: (a) Receiving, processing, and evaluating requests for priority actions from... doubt. However, processing of Emergency NSEP service requests will not be delayed for verification...

  20. Coal gasification systems engineering and analysis. Appendix A: Coal gasification catalog

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The scope of work in preparing the Coal Gasification Data Catalog included the following subtasks: (1) candidate system subsystem definition, (2) raw materials analysis, (3) market analysis for by-products, (4) alternate products analysis, (5) preliminary integrated facility requirements. Definition of candidate systems/subsystems includes the identity of and alternates for each process unit, raw material requirements, and the cost and design drivers for each process design.

  1. Developing an Intelligent Automatic Appendix Extraction Method from Ultrasonography Based on Fuzzy ART and Image Processing.

    PubMed

    Kim, Kwang Baek; Park, Hyun Jun; Song, Doo Heon; Han, Sang-suk

    2015-01-01

    Ultrasound examination (US) does a key role in the diagnosis and management of the patients with clinically suspected appendicitis which is the most common abdominal surgical emergency. Among the various sonographic findings of appendicitis, outer diameter of the appendix is most important. Therefore, clear delineation of the appendix on US images is essential. In this paper, we propose a new intelligent method to extract appendix automatically from abdominal sonographic images as a basic building block of developing such an intelligent tool for medical practitioners. Knowing that the appendix is located at the lower organ area below the bottom fascia line, we conduct a series of image processing techniques to find the fascia line correctly. And then we apply fuzzy ART learning algorithm to the organ area in order to extract appendix accurately. The experiment verifies that the proposed method is highly accurate (successful in 38 out of 40 cases) in extracting appendix.

  2. Appendix Y. The Integrated Communications Experiment (ICE) Summary.

    ERIC Educational Resources Information Center

    Coffin, Robert

    This appendix describes the Integrated Communications Experiment (ICE), a comprehensive computer software capability developed for the ComField Project. Each major characteristic of the data processing system is treated separately: natural language processing, flexibility, noninterference with the educational process, multipurposeness,…

  3. 23 CFR 450.318 - Transportation planning studies and project development.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... and the FTA, as appropriate. (c) By agreement of the NEPA lead agencies, the above integration may be... processes is contained in Appendix A to this part, including an explanation that it is non-binding guidance...

  4. 23 CFR 450.318 - Transportation planning studies and project development.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... and the FTA, as appropriate. (c) By agreement of the NEPA lead agencies, the above integration may be... processes is contained in Appendix A to this part, including an explanation that it is non-binding guidance...

  5. 23 CFR 450.318 - Transportation planning studies and project development.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... and the FTA, as appropriate. (c) By agreement of the NEPA lead agencies, the above integration may be... processes is contained in Appendix A to this part, including an explanation that it is non-binding guidance...

  6. Earth Observing System. Volume 1, Part 2: Science and Mission Requirements. Working Group Report Appendix

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Areas of global hydrologic cycles, global biogeochemical cycles geophysical processes are addressed including biological oceanography, inland aquatic resources, land biology, tropospheric chemistry, oceanic transport, polar glaciology, sea ice and atmospheric chemistry.

  7. Northeastern Gulf of Mexico coastal and marine ecosystem program: Data search and synthesis, annotated bibliography. Appendix A: Physical oceanography. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This study summarizes environmental and socioeconomic information related to the Florida Panhandle Outer Continental Shelf (OCS). It contains a conceptual model of active processes and identification of information gaps that will be useful in the design of future environmental studies in the geographic area. The annotated bibliography for this study is printer in six volumes, each pertaining to a specific topic. They are as follows: Appendix A--Physical Oceanography; Appendix B--Meteorology; Appendix C--Geology; Appendix D--Chemistry; Appendix E--Biology; and Appendix F--Socioeconomics. This volume contains bibliographic references pertaining to physical oceanography.

  8. 32 CFR Appendix C to Part 286 - DD Form 2086, “Record of Freedom of Information (FOI) Processing Cost”

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false DD Form 2086, âRecord of Freedom of Information (FOI) Processing Costâ C Appendix C to Part 286 National Defense Department of Defense (Continued... INFORMATION ACT PROGRAM REGULATION Pt. 286, App. C Appendix C to Part 286—DD Form 2086, “Record of Freedom of...

  9. 10 CFR Appendix O to Part 110 - Illustrative List of Fuel Element Fabrication Plant Equipment and Components Under NRC's Export...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... performance and safety during reactor operation. Also, in all cases precise control of processes, procedures... elements include equipment that: (1) Normally comes in direct contact with, or directly processes or... pellets; (2) Automatic welding machines especially designed or prepared for welding end caps onto the fuel...

  10. 49 CFR Appendix A to Part 580 - Secure Printing Processes and Other Secure Processes

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Secure Printing Processes and Other Secure... DISCLOSURE REQUIREMENTS Pt. 580, App. A Appendix A to Part 580—Secure Printing Processes and Other Secure... printing—a printing process utilized in the production of bank-notes and other security documents whereby...

  11. 33 CFR Appendix C to Part 331 - Administrative Appeal Process for Approved Jurisdictional Determinations

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Administrative Appeal Process for... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE APPEAL PROCESS Pt. 331, App. C Appendix C to Part 331—Administrative Appeal Process for Approved Jurisdictional Determinations ER28MR00...

  12. 32 CFR Appendix D to Part 286 - DD Form 2086-1, “Record of Freedom of Information (FOI) Processing Cost for Technical Data”

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false DD Form 2086-1, âRecord of Freedom of Information (FOI) Processing Cost for Technical Dataâ D Appendix D to Part 286 National Defense Department of... FREEDOM OF INFORMATION ACT PROGRAM REGULATION Pt. 286, App. D Appendix D to Part 286—DD Form 2086-1...

  13. 49 CFR Appendix C to Part 544 - Motor Vehicle Rental and Leasing Companies (Including Licensees and Franchisees) Subject to the...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 6 2012-10-01 2012-10-01 false Motor Vehicle Rental and Leasing Companies (Including Licensees and Franchisees) Subject to the Reporting Requirements of Part 544 C Appendix C to Part... Appendix C to Part 544—Motor Vehicle Rental and Leasing Companies (Including Licensees and Franchisees...

  14. 49 CFR Appendix C to Part 544 - Motor Vehicle Rental and Leasing Companies (Including Licensees and Franchisees) Subject to the...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 6 2011-10-01 2011-10-01 false Motor Vehicle Rental and Leasing Companies (Including Licensees and Franchisees) Subject to the Reporting Requirements of Part 544 C Appendix C to Part... Appendix C to Part 544—Motor Vehicle Rental and Leasing Companies (Including Licensees and Franchisees...

  15. Synthesis Gas Demonstration Plant, Baskett, Kentucky: environmental report. [Contains chapter 4 and appendix 4A

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume contains chapter 4 and Appendix 4A which include descriptions of use of adjacent land and water (within miles of the proposed site), baseline ecology, air quality, meteorology, noise, hydrology, water quality, geology, soils and socio-economic factors. Appendix 4A includes detailed ecological surveys made in the area including the methods used. (LTN)

  16. Crew appliance concepts. Volume 5, appendix C: Modular space station appliances supporting engineering data

    NASA Technical Reports Server (NTRS)

    Proctor, B. W.; Reysa, R. P.; Russell, D. J.

    1975-01-01

    Housekeeping, off-duty, and medical data concerning the appliances considered for the space station are presented. Appliance functions analyzed include: cleanup, collection, processing and storage of refuse; crew entertainment and physical exercise, and the autoclaves and ergometers.

  17. Definition and means of maintaining the criticality detectors and alarms portion of the PFP safety envelope

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, W.F.

    The purpose of this document is to provide the definition and means of maintaining the Safety Envelope (SE) related to the Criticality Alarm System (CAS). This document provides amplification of the Limiting Condition for Operation (LCO) described in the Plutonium Finishing Plant (PFP) Operational Safety Requirements (OSR), WHC-SD-CP-OSR-010, Rev. 0, 1994, Section 3.1.2, Criticality Detectors and Alarms. This document, with its appendices, provides the following: (1) System functional requirements for determining system operability (Section 3); (2) A list of annotated system block diagrams which indicate the safety envelope boundaries (Appendix C); (3) A list of the Safety Class 1 andmore » 2 Safety Envelope (SC-1/2 SE) equipment for input into the Master Component Index (Appendix B); (4) Functional requirements for individual SC-1/2 SE components, including appropriate setpoints and process parameters (Section 6 and Appendix A); (5) A list of the operational, maintenance and surveillance procedures necessary to operate and maintain the SC-1/2 SE components as required by the LCO (Section 6 and Appendix A).« less

  18. 14 CFR Appendix C to Part 151 - Appendix C to Part 151

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Appendix C to Part 151 C Appendix C to Part...) AIRPORTS FEDERAL AID TO AIRPORTS Pt. 151, App. C Appendix C to Part 151 There is set forth below an... Items 1. Maintenance-type work, including: (a) Seal coats. (b) Crack filling. (c) Resealing joints. (d...

  19. Hubble Space Telescope: SRM/QA observations and lessons learned

    NASA Technical Reports Server (NTRS)

    Rodney, George A.

    1990-01-01

    The Hubble Space Telescope (HST) Optical Systems Board of Investigation was established on July 2, 1990 to review, analyze, and evaluate the facts and circumstances regarding the manufacture, development, and testing of the HST Optical Telescope Assembly (OTA). Specifically, the board was tasked to ascertain what caused the spherical aberration and how it escaped notice until on-orbit operation. The error that caused the on-orbit spherical aberration in the primary mirror was traced to the assembly process of the Reflective Null Corrector, one of the three Null Correctors developed as special test equipment (STE) to measure and test the primary mirror. Therefore, the safety, reliability, maintainability, and quality assurance (SRM&QA) investigation covers the events and the overall product assurance environment during the manufacturing phase of the primary mirror and Null Correctors (from 1978 through 1981). The SRM&QA issues that were identified during the HST investigation are summarized. The crucial product assurance requirements (including nonconformance processing) for the HST are examined. The history of Quality Assurance (QA) practices at Perkin-Elmer (P-E) for the period under investigation are reviewed. The importance of the information management function is discussed relative to data retention/control issues. Metrology and other critical technical issues also are discussed. The SRM&QA lessons learned from the investigation are presented along with specific recommendations. Appendix A provides the MSFC SRM&QA report. Appendix B provides supplemental reference materials. Appendix C presents the findings of the independent optical consultants, Optical Research Associates (ORA). Appendix D provides further details of the fault-tree analysis portion of the investigation process.

  20. Development of iFab (Instant Foundry Adaptive Through Bits) Manufacturing Process and Machine Library

    DTIC Science & Technology

    2012-08-01

    loaded joints including bearing -type shear loaded joints and friction type shear loaded joints . Appendix Figure 2f.A-3 shows an illustration of each... Loaded Joint Bearing Type Shear Loaded Joint Friction Type Shear Loaded Joint Tension Loaded Joint 62 Approved for public release...Joining of materials and structures: from pragmatic process to enabling technology.

  1. NAC Aftermarket Brake Components Project (Secondary Items)

    DTIC Science & Technology

    2007-02-06

    2. Appendix B. Test Plans and Sample Assignments for Disc Brake Pads and (Foundation) Drum Brake Shoes. 3. Appendix C. Test Plans and Sample...Assignments for Disc Brake Rotors and Drum Brake Drums . 4. Appendix D. Off-vehicle Inertia Dynamometer Test Procedures. 5. Appendix E. “Crack & Fatigue...apples” comparison testing processes, and require project outputs documents to be proofed by actual independent testing; HMMWV-ECV ( disc ) and HEMTT

  2. Mapping and sequencing the human genome: Science, ethics, and public policy. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McInerney, J.D.

    1993-03-31

    Development of Mapping and Sequencing the Human Genome: Science, Ethics, and Public Policy followed the standard process of curriculum development at the Biological Sciences Curriculum Study (BSCS), the process is described. The production of this module was a collaborative effort between BSCS and the American Medical Association (AMA). Appendix A contains a copy of the module. Copies of reports sent to the Department of Energy (DOE) during the development process are contained in Appendix B; all reports should be on file at DOE. Appendix B also contains copies of status reports submitted to the BSCS Board of Directors.

  3. Saint Lawrence Seaway Navigation-Aid System Study : Volume I - Text and Appendixes A and D

    DOT National Transportation Integrated Search

    1978-09-01

    The requirements for a navigation guidance system which will effect an increase in the ship processing capacity of the Saint Lawrence Seaway (Lake Ontario to Montreal, Quebec) are developed. The requirements include a specification of system position...

  4. A Free Entry and Exit Experiment.

    ERIC Educational Resources Information Center

    Garratt, Rod

    2000-01-01

    Describes a two-stage experiment where students play the role of farmers who must select one of four markets (corn, wheat, rice, or soybeans). Demonstrates the process leading to equilibrium in a multimarket setting. Includes an appendix with the farmer profit chart and homework exercises. (CMK)

  5. 33 CFR Appendix A to Part 331 - Administrative Appeal Process for Permit Denials and Proffered Permits

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Administrative Appeal Process for... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE APPEAL PROCESS Pt. 331, App. A Appendix A to Part 331—Administrative Appeal Process for Permit Denials and Proffered Permits ER28MR00.000 ...

  6. Integration of Narrative Processing, Data Fusion, and Database Updating Techniques in an Automated System.

    DTIC Science & Technology

    1981-10-29

    are implemented, respectively, in the files "W-Update," "W-combine" and RW-Copy," listed in the appendix. The appendix begins with a typescript of an...the typescript ) and the copying process (steps 45 and 46) are shown as human actions in the typescript , but can be performed easily by a "master...for Natural Language, M. Marcus, MIT Press, 1980. I 29 APPENDIX: DATABASE UPDATING EXPERIMENT 30 CONTENTS Typescript of an experiment in Rosie

  7. Introduction to Plasma Physics

    NASA Astrophysics Data System (ADS)

    Gurnett, Donald A.; Bhattacharjee, Amitava

    2017-03-01

    Preface; 1. Introduction; 2. Characteristic parameters of a plasma; 3. Single particle motions; 4. Waves in a cold plasma; 5. Kinetic theory and the moment equations; 6. Magnetohydrodynamics; 7. MHD equilibria and stability; 8. Discontinuities and shock waves; 9. Electrostatic waves in a hot unmagnetized plasma; 10. Waves in a hot magnetized plasma; 11. Nonlinear effects; 12. Collisional processes; Appendix A. Symbols; Appendix B. Useful trigonometric identities; Appendix C. Vector differential operators; Appendix D. Vector calculus identities; Index.

  8. Methods of measurement for semiconductor materials, process control, and devices

    NASA Technical Reports Server (NTRS)

    Bullis, W. M. (Editor)

    1972-01-01

    Activities directed toward the development of methods of measurement for semiconductor materials, process control, and devices are described. Topics investigated include: measurements of transistor delay time; application of the infrared response technique to the study of radiation-damaged, lithium-drifted silicon detectors; and identification of a condition that minimizes wire flexure and reduces the failure rate of wire bonds in transistors and integrated circuits under slow thermal cycling conditions. Supplementary data concerning staff, standards committee activities, technical services, and publications are included as appendixes.

  9. Emergency Plan for the Locks and Dams at St. Anthony Falls Minneapolis, Minnesota

    DTIC Science & Technology

    1987-03-01

    Identification Subplan APPENDIX B Emergency Operations and Repair Subplan APPENDIX C Emergency Notification Subplan APPENDIX D Inundation Map Package...Emergency Operations and Repair Subplan 3) Appendix C , Emergency Notification Subplan 4) Appendix D , Inundation Maps and Hydraulic Data b. AP...which were selected for planning include: a. Structural Damage b. Sabotage c . Extreme Storm d . Excess Seepage e. Failure Due to Scouring A brief dis

  10. Data analysis software for the autoradiographic enhancement process. Volumes 1, 2, and 3, and appendix

    NASA Technical Reports Server (NTRS)

    Singh, S. P.

    1979-01-01

    The computer software developed to set up a method for Wiener spectrum analysis of photographic films is presented. This method is used for the quantitative analysis of the autoradiographic enhancement process. The software requirements and design for the autoradiographic enhancement process are given along with the program listings and the users manual. A software description and program listings modification of the data analysis software are included.

  11. 10 CFR Appendix A to Part 725 - Categories of Restricted Data Available

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... centrifuge or gaseous diffusion processes. b. Design, construction, and operation of any plant, facility or..., design, criticality studies and operation of reactors, reactor systems and reactor components. d... aqueous lithium hydroxide solution in packed columns. Not included is information regarding plant design...

  12. 10 CFR Appendix A to Part 725 - Categories of Restricted Data Available

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... centrifuge or gaseous diffusion processes. b. Design, construction, and operation of any plant, facility or..., design, criticality studies and operation of reactors, reactor systems and reactor components. d... aqueous lithium hydroxide solution in packed columns. Not included is information regarding plant design...

  13. 10 CFR Appendix A to Part 725 - Categories of Restricted Data Available

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... centrifuge or gaseous diffusion processes. b. Design, construction, and operation of any plant, facility or..., design, criticality studies and operation of reactors, reactor systems and reactor components. d... aqueous lithium hydroxide solution in packed columns. Not included is information regarding plant design...

  14. 10 CFR Appendix A to Part 725 - Categories of Restricted Data Available

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... centrifuge or gaseous diffusion processes. b. Design, construction, and operation of any plant, facility or..., design, criticality studies and operation of reactors, reactor systems and reactor components. d... aqueous lithium hydroxide solution in packed columns. Not included is information regarding plant design...

  15. 34 CFR Appendix to Part 5 - Unknown Title

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the Department. Research protocol, design, processing, and other technical information to the extent... report submitted for comment prior to acceptance. Research protocol, design, processing, and other...-10) Pt. 5, App. Appendix to Part 5 [The following are some examples of specific records (or specific...

  16. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Columbia River System Operation Review

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This documentmore » is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.« less

  17. 32 CFR Appendix A to Part 286 - Combatant Commands-Processing Procedures for FOIA Appeals

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Combatant Commands-Processing Procedures for... REGULATION Pt. 286, App. A Appendix A to Part 286—Combatant Commands—Processing Procedures for FOIA Appeals... Commands are placed under the jurisdiction of the Office of the Secretary of Defense, instead of the...

  18. 32 CFR Appendix A to Part 286 - Combatant Commands-Processing Procedures for FOIA Appeals

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Combatant Commands-Processing Procedures for... REGULATION Pt. 286, App. A Appendix A to Part 286—Combatant Commands—Processing Procedures for FOIA Appeals... Commands are placed under the jurisdiction of the Office of the Secretary of Defense, instead of the...

  19. 32 CFR Appendix A to Part 286 - Combatant Commands-Processing Procedures for FOIA Appeals

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Combatant Commands-Processing Procedures for... REGULATION Pt. 286, App. A Appendix A to Part 286—Combatant Commands—Processing Procedures for FOIA Appeals... Commands are placed under the jurisdiction of the Office of the Secretary of Defense, instead of the...

  20. 32 CFR Appendix A to Part 286 - Combatant Commands-Processing Procedures for FOIA Appeals

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Combatant Commands-Processing Procedures for... REGULATION Pt. 286, App. A Appendix A to Part 286—Combatant Commands—Processing Procedures for FOIA Appeals... Commands are placed under the jurisdiction of the Office of the Secretary of Defense, instead of the...

  1. 32 CFR Appendix A to Part 286 - Combatant Commands-Processing Procedures for FOIA Appeals

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Combatant Commands-Processing Procedures for... REGULATION Pt. 286, App. A Appendix A to Part 286—Combatant Commands—Processing Procedures for FOIA Appeals... Commands are placed under the jurisdiction of the Office of the Secretary of Defense, instead of the...

  2. Electric Field-Mediated Processing of Biomaterials: Toward Nanostructured Biomimetic Systems. Appendix 3

    NASA Technical Reports Server (NTRS)

    Bowlin, Gary L.; Simpson, David G.; Lam, Philippe; Wnek, Gary E.

    2001-01-01

    Significant opportunities exist for the processing of synthetic and biological polymers using electric fields ('electroprocessing'). We review casting of multi-component films and the spinning of fibers in electric fields, and indicate opportunities for the creation of smart polymer systems using these approaches. Applications include 2-D substrates for cell growth and diagnostics, scaffolds for tissue engineering and repair, and electromechanically active biosystems.

  3. 32 CFR Appendix E to Part 37 - What Provisions May a Participant Need To Include When Purchasing Goods or Services Under a TIA?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Include When Purchasing Goods or Services Under a TIA? E Appendix E to Part 37 National Defense Department... INVESTMENT AGREEMENTS Pt. 37, App. E Appendix E to Part 37—What Provisions May a Participant Need To Include When Purchasing Goods or Services Under a TIA? A. As discussed in § 37.705, you must inform recipients...

  4. 32 CFR Appendix E to Part 37 - What Provisions May a Participant Need To Include When Purchasing Goods or Services Under a TIA?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Include When Purchasing Goods or Services Under a TIA? E Appendix E to Part 37 National Defense Department... INVESTMENT AGREEMENTS Pt. 37, App. E Appendix E to Part 37—What Provisions May a Participant Need To Include When Purchasing Goods or Services Under a TIA? A. As discussed in § 37.705, you must inform recipients...

  5. 32 CFR Appendix E to Part 282 - Appeals

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Appeals E Appendix E to Part 282 National... PROCEDURES FOR SETTLING PERSONNEL AND GENERAL CLAIMS AND PROCESSING ADVANCE DECISION REQUESTS Pt. 282, App. E Appendix E to Part 282—Appeals (a) Who May Appeal. A claimant may appeal if an initial determination denies...

  6. 40 CFR Appendix Xiii to Part 266 - Mercury Bearing Wastes That May Be Processed in Exempt Mercury Recovery Units

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... are exempt mercury-bearing materials with less than 500 ppm of 40 CFR Part 261, appendix VIII organic... tank sludge 13. Mercury cell process solids 14. Recoverable levels of mercury contained in soil [59 FR...

  7. 40 CFR Appendix Xiii to Part 266 - Mercury Bearing Wastes That May Be Processed in Exempt Mercury Recovery Units

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... are exempt mercury-bearing materials with less than 500 ppm of 40 CFR Part 261, appendix VIII organic... tank sludge 13. Mercury cell process solids 14. Recoverable levels of mercury contained in soil [59 FR...

  8. 40 CFR Appendix Xiii to Part 266 - Mercury Bearing Wastes That May Be Processed in Exempt Mercury Recovery Units

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... are exempt mercury-bearing materials with less than 500 ppm of 40 CFR Part 261, appendix VIII organic... tank sludge 13. Mercury cell process solids 14. Recoverable levels of mercury contained in soil [59 FR...

  9. 40 CFR Appendix Xiii to Part 266 - Mercury Bearing Wastes That May Be Processed in Exempt Mercury Recovery Units

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... are exempt mercury-bearing materials with less than 500 ppm of 40 CFR Part 261, appendix VIII organic... tank sludge 13. Mercury cell process solids 14. Recoverable levels of mercury contained in soil [59 FR...

  10. 40 CFR Appendix Xiii to Part 266 - Mercury Bearing Wastes That May Be Processed in Exempt Mercury Recovery Units

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... are exempt mercury-bearing materials with less than 500 ppm of 40 CFR Part 261, appendix VIII organic... tank sludge 13. Mercury cell process solids 14. Recoverable levels of mercury contained in soil [59 FR...

  11. 29 CFR Appendix to Part 1400 - Code of Professional Conduct for Labor Mediators

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the principles of free and responsible collective bargaining. They must be aware that their duties and... to establish principles applicable to all professional mediators employed by city, State or Federal... to resort to economic and legal sanctions. However, the mediation process may include a...

  12. 17 CFR Appendix B to Part 145 - Schedule of Fees

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... professional personnel in searching or reviewing records. (3) When searches require the expertise of a computer... shared access network servers, the computer processing time is included in the search time for the staff... equivalent of two hours of professional search time. (d) Aggregation of requests. For purposes of determining...

  13. Saint Lawrence Seaway Navigation-Aid System Study : Volume II - Appendix B - User's Manual and Documentation of Seaway Capacity and Capacity Analysis Programs

    DOT National Transportation Integrated Search

    1978-09-01

    The requirements for a navigation guidance system which will effect an increase in the ship processing capacity of the Saint Lawrence Seaway (Lake Ontario to Montreal, Quebec) are developed. The requirements include a specification of system position...

  14. Saint Lawrence Seaway Navigation-Aid System Study : Volume III - Appendix C - User's Manual and Documentation of the Ship Maneuvering Requirements Computer Program

    DOT National Transportation Integrated Search

    1978-09-01

    The requirements for a navigation guidance system which will effect an increase in the ship processing capacity of the Saint Lawrence Seaway (Lake Ontario to Montreal, Quebec) are developed. The requirements include a specification of system position...

  15. 40 CFR Appendix S to Part 51 - Emission Offset Interpretative Ruling

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... included in NAICS codes 325193 or 312140; (u) Fossil-fuel boilers (or combination thereof) totaling more... fiber processing plants; (y) Charcoal production plants; (z) Fossil fuel-fired steam electric plants of... source or activity, which condense to form particulate matter at ambient temperatures. On or after...

  16. 40 CFR Appendix S to Part 51 - Emission Offset Interpretative Ruling

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... included in NAICS codes 325193 or 312140; (u) Fossil-fuel boilers (or combination thereof) totaling more... fiber processing plants; (y) Charcoal production plants; (z) Fossil fuel-fired steam electric plants of... source or activity, which condense to form particulate matter at ambient temperatures. On or after...

  17. 40 CFR Appendix B to Part 438 - Oily Operations Definitions

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... part. Abrasive blasting includes bead, grit, shot, and sand blasting, and may be performed either dry... between different polarity electrodes, one the part and the other the tool, separated by a small gap. The... mechanical processes such as hammer forging, shot peening, peening, coining, high-energy-rate forming...

  18. 40 CFR Appendix C to Part 438 - Metal-Bearing Operations Definitions

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... chromium. (1) In phosphate conversion, coatings are applied for one or more of the following reasons: to... electrolysis. The part is one of the electrodes and the electrolyte is usually alkaline. Electrolytic alkaline... during salt bath descaling includes spent process solutions, quenches, and rinses. Shot Tower—Lead Shot...

  19. 40 CFR Appendix B to Part 438 - Oily Operations Definitions

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... against the part. Abrasive blasting includes bead, grit, shot, and sand blasting, and may be performed... between different polarity electrodes, one the part and the other the tool, separated by a small gap. The... mechanical processes such as hammer forging, shot peening, peening, coining, high-energy-rate forming...

  20. 40 CFR Appendix B to Part 438 - Oily Operations Definitions

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... against the part. Abrasive blasting includes bead, grit, shot, and sand blasting, and may be performed... between different polarity electrodes, one the part and the other the tool, separated by a small gap. The... mechanical processes such as hammer forging, shot peening, peening, coining, high-energy-rate forming...

  1. 40 CFR Appendix C to Part 438 - Metal-Bearing Operations Definitions

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... chromium. (1) In phosphate conversion, coatings are applied for one or more of the following reasons: to... electrolysis. The part is one of the electrodes and the electrolyte is usually alkaline. Electrolytic alkaline... during salt bath descaling includes spent process solutions, quenches, and rinses. Shot Tower—Lead Shot...

  2. 40 CFR Appendix C to Part 438 - Metal-Bearing Operations Definitions

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... chromium. (1) In phosphate conversion, coatings are applied for one or more of the following reasons: to... electrolysis. The part is one of the electrodes and the electrolyte is usually alkaline. Electrolytic alkaline... during salt bath descaling includes spent process solutions, quenches, and rinses. Shot Tower—Lead Shot...

  3. 40 CFR Appendix B to Part 438 - Oily Operations Definitions

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... against the part. Abrasive blasting includes bead, grit, shot, and sand blasting, and may be performed... between different polarity electrodes, one the part and the other the tool, separated by a small gap. The... mechanical processes such as hammer forging, shot peening, peening, coining, high-energy-rate forming...

  4. 40 CFR Appendix C to Part 438 - Metal-Bearing Operations Definitions

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... chromium. (1) In phosphate conversion, coatings are applied for one or more of the following reasons: to... electrolysis. The part is one of the electrodes and the electrolyte is usually alkaline. Electrolytic alkaline... during salt bath descaling includes spent process solutions, quenches, and rinses. Shot Tower—Lead Shot...

  5. 40 CFR Appendix B to Part 438 - Oily Operations Definitions

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... part. Abrasive blasting includes bead, grit, shot, and sand blasting, and may be performed either dry... between different polarity electrodes, one the part and the other the tool, separated by a small gap. The... mechanical processes such as hammer forging, shot peening, peening, coining, high-energy-rate forming...

  6. 40 CFR Appendix C to Part 438 - Metal-Bearing Operations Definitions

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... chromium. (1) In phosphate conversion, coatings are applied for one or more of the following reasons: to... electrolysis. The part is one of the electrodes and the electrolyte is usually alkaline. Electrolytic alkaline... during salt bath descaling includes spent process solutions, quenches, and rinses. Shot Tower—Lead Shot...

  7. 32 CFR Appendix A to Part 223 - Procedures for Identifying and Controlling DoD UCNI

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... security measures, including security plans, procedures, and equipment, for the physical protection of DoD... stand-alone personal computers, or shared-logic work processing systems, if protection from unauthorized... and security by increasing significantly the likelihood of the illegal production of nuclear weapons...

  8. Applications of Subsurface Radar for Mine Detection

    DTIC Science & Technology

    1990-12-31

    sofware routines for signal/image processing and image display, which are included in the Appendix along with examples of recent images obtained of the... maxima and minima. The case of the M19 shown a main backscattering lobe only 5* wide. These results demonstrate the realiability and consistency of

  9. 12 CFR Appendix A to Subpart H of... - Consumer Grievance Process

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of the bank has violated the requirements of this subpart should contact the Consumer Complaints... 12 Banks and Banking 2 2011-01-01 2011-01-01 false Consumer Grievance Process A Appendix A to... SYSTEM MEMBERSHIP OF STATE BANKING INSTITUTIONS IN THE FEDERAL RESERVE SYSTEM (REGULATION H) Consumer...

  10. 12 CFR Appendix A to Subpart H of... - Consumer Grievance Process

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of the bank has violated the requirements of this subpart should contact the Consumer Complaints... 12 Banks and Banking 2 2012-01-01 2012-01-01 false Consumer Grievance Process A Appendix A to... SYSTEM MEMBERSHIP OF STATE BANKING INSTITUTIONS IN THE FEDERAL RESERVE SYSTEM (REGULATION H) Consumer...

  11. 12 CFR Appendix A to Subpart H of... - Consumer Grievance Process

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... of the bank has violated the requirements of this subpart should contact the Consumer Complaints... 12 Banks and Banking 2 2013-01-01 2013-01-01 false Consumer Grievance Process A Appendix A to... SYSTEM MEMBERSHIP OF STATE BANKING INSTITUTIONS IN THE FEDERAL RESERVE SYSTEM (REGULATION H) Consumer...

  12. 12 CFR Appendix A to Subpart H of... - Consumer Grievance Process

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... of the bank has violated the requirements of this subpart should contact the Consumer Complaints... 12 Banks and Banking 2 2014-01-01 2014-01-01 false Consumer Grievance Process A Appendix A to... SYSTEM MEMBERSHIP OF STATE BANKING INSTITUTIONS IN THE FEDERAL RESERVE SYSTEM (REGULATION H) Consumer...

  13. A Design Architecture for an Integrated Training System Decision Support System

    DTIC Science & Technology

    1990-07-01

    Sensory modes include visual, auditory, tactile, or kinesthetic; performance categories include time to complete , speed of response, or correct action ...procedures, and finally application and examples from the aviation proponency with emphasis on the LHX program. Appendix B is a complete bibliography...integrated analysis of ITS development. The approach was designed to provide an accurate and complete representation of the ITS development process and

  14. 33 CFR Appendix B to Part 331 - Applicant Options With Initial Proffered Permit

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Applicant Options With Initial Proffered Permit B Appendix B to Part 331 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE APPEAL PROCESS Pt. 331, App. B Appendix B to Part 331...

  15. 32 CFR Appendix C to Part 989 - Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS)

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ENVIRONMENTAL PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) Pt. 989, App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...

  16. 32 CFR Appendix C to Part 989 - Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS)

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ENVIRONMENTAL PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) Pt. 989, App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...

  17. 32 CFR Appendix D to Part 37 - What Common National Policy Requirements May Apply and Need To Be Included in TIAs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Apply and Need To Be Included in TIAs? D Appendix D to Part 37 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pt. 37, App. D Appendix D to Part 37—What Common National Policy Requirements May Apply and Need To...

  18. Manufacturing Planning Guide

    NASA Technical Reports Server (NTRS)

    Waid, Michael

    2011-01-01

    Manufacturing process, milestones and inputs are unknowns to first-time users of the manufacturing facilities. The Manufacturing Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their project engineering personnel in manufacturing planning and execution. Material covered includes a roadmap of the manufacturing process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  19. Appendix A: Ecoprovinces of the Central North American Cordillera and adjacent plains

    Treesearch

    Dennis A. Demarchi

    1994-01-01

    The fundamental difference between the map presented here and other regional ecosystem classifications is that this map's ecological units are based on climatic processes rather than vegetation communities (map appears at the end of this appendix). Macroclimatic processes are the physical and thermodynamic interaction between climatic controls, or the relatively...

  20. 32 CFR Appendix B to Part 231 - In-Store Banking

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) MISCELLANEOUS PROCEDURES GOVERNING BANKS, CREDIT UNIONS AND OTHER FINANCIAL INSTITUTIONS ON DOD INSTALLATIONS Pt. 231, App. B Appendix B to Part 231—In-Store Banking A. Selection Process. The purpose of this guidance is to assure an impartial and thorough process to select the best on-base financial institution to...

  1. 32 CFR Appendix B to Part 231 - In-Store Banking

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) MISCELLANEOUS PROCEDURES GOVERNING BANKS, CREDIT UNIONS AND OTHER FINANCIAL INSTITUTIONS ON DOD INSTALLATIONS Pt. 231, App. B Appendix B to Part 231—In-Store Banking A. Selection Process. The purpose of this guidance is to assure an impartial and thorough process to select the best on-base financial institution to...

  2. 32 CFR Appendix B to Part 231 - In-Store Banking

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) MISCELLANEOUS PROCEDURES GOVERNING BANKS, CREDIT UNIONS AND OTHER FINANCIAL INSTITUTIONS ON DOD INSTALLATIONS Pt. 231, App. B Appendix B to Part 231—In-Store Banking A. Selection Process. The purpose of this guidance is to assure an impartial and thorough process to select the best on-base financial institution to...

  3. 31 CFR Appendix N to Subpart C of... - Financial Crimes Enforcement Network

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... respect to notification and access to records and accountings of disclosures of records. This appendix... “Statements of Disagreement” may be filed, the officer designated to receive service of process and the addresses for delivery of requests, appeals, and service of process. In addition, it references the notice...

  4. 12 CFR Appendix A to Part 536 - Consumer Grievance Process

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., or telephone 202-906-6237 or 800-842-6929, or e-mail consumer.complaint@ots.treas.gov. ... 12 Banks and Banking 6 2013-01-01 2012-01-01 true Consumer Grievance Process A Appendix A to Part 536 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY CONSUMER PROTECTION IN...

  5. 12 CFR Appendix A to Part 536 - Consumer Grievance Process

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or telephone 202-906-6237 or 800-842-6929, or e-mail consumer.complaint@ots.treas.gov. ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Consumer Grievance Process A Appendix A to Part 536 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY CONSUMER PROTECTION IN...

  6. 12 CFR Appendix A to Part 536 - Consumer Grievance Process

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., or telephone 202-906-6237 or 800-842-6929, or e-mail consumer.complaint@ots.treas.gov. ... 12 Banks and Banking 6 2012-01-01 2012-01-01 false Consumer Grievance Process A Appendix A to Part 536 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY CONSUMER PROTECTION IN...

  7. 12 CFR Appendix A to Part 536 - Consumer Grievance Process

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., or telephone 202-906-6237 or 800-842-6929, or e-mail consumer.complaint@ots.treas.gov. ... 12 Banks and Banking 6 2014-01-01 2012-01-01 true Consumer Grievance Process A Appendix A to Part 536 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY CONSUMER PROTECTION IN...

  8. US Department of Energy Nevada Operations Office annual site environmental report: 1993. Volume 2: Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Black, S.C.; Glines, W.M.; Townsend, Y.E.

    1994-09-01

    This report is comprised of appendices which support monitoring and surveillance on and around the Nevada Test Site (NTS) during 1993. Appendix A contains onsite Pu-238, gross beta, and gamma-emitting radionuclides in air. Appendix B contains onsite tritium in air. Appendix C contains onsite Pu-238, Sr-90, gross alpha and beta, gamma-emitting radionuclides, Ra-226, Ra-228 and tritium in water. A summary of 1993 results of offsite radiological monitoring is included in Appendix D. Appendix E contains radioactive noble gases in air onsite. Appendix F contains onsite thermoluminescent dosimeter data. Historical trends in onsite thermoluminescent dosimeter data are contained in Appendix G.more » Appendix H summarizes 1993 compliance at the DOE/NV NTS and non-NTS facilities. Appendix I summarizes the 1993 results of non radiological monitoring.« less

  9. Definition and means of maintaining the supply ventilation system seismic shutdown portion of the PFP safety envelope

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keck, R.D.

    1997-01-21

    The purpose of this document is to record the technical evaluation of the Limiting Condition for Operation (LCO) described in the Plutonium Finishing Plant (PFP) Operational Safety Requirements, WHC-SD-CP-OSR- 010, Rev. 0. Kay 1994, Section 3.2.3, `Supply Ventilation System Seismic Shutdown.` This document, with its appendices, provides the following: 1. The system functional requirements for determining system operability (Section 3). 2. Evaluations of equipment to determine the safety boundary for the system (Section 4). 3. A list of annotated drawings which show the safety envelope boundaries (Appendix C). 4. A list of the safety envelope equipment (Appendix B). 5. Functionalmore » requirements for the individual safety envelope equipment, including appropriate setpoints and process parameters (Section 4.1). 6. A list of the operational, maintenance and surveillance procedures necessary to operate and maintain the system equipment within the safety envelope (Sections 5 and 6 and Appendix A).« less

  10. Establishing the LINC (Learning Individualized for Canadians) Program: A Manual for Administrators and Instructors.

    ERIC Educational Resources Information Center

    Tippett, Glen; Mullen, Vernon

    A manual to accompany LINC courses in communications and mathematics, containing information on background, objectives, components, individualized process, and procedures for curriculum development and implementation of LINC Program, is presented. It was formerly referred to as The LINC Program User's Manual. An appendix includes a Reading List…

  11. 40 CFR Appendix A to Subpart K of... - Criteria for evaluating a State's proposed NEPA-Like process

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SERP will adequately consider: (1) Designation of a study area comparable to the final system; (2) A...) Present and future conditions; (5) Land use and other social parameters including recreation and open... (residential, commercial, institutional and industrial) within the project study area; and (8) Other...

  12. 40 CFR Appendix A to Subpart K of... - Criteria for evaluating a State's proposed NEPA-Like process

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SERP will adequately consider: (1) Designation of a study area comparable to the final system; (2) A...) Present and future conditions; (5) Land use and other social parameters including recreation and open... (residential, commercial, institutional and industrial) within the project study area; and (8) Other...

  13. 40 CFR Appendix A to Subpart L - Criteria for Evaluating a State's Proposed NEPA-Like Process

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... consider: (1) Designation of a study area comparable to the final system; (2) A range of feasible... conditions; (5) Land use and other social parameters including relevant recreation and open-space..., institutional, and industrial) within the project study area; and (8) Other anticipated public works projects...

  14. 40 CFR Appendix A to Subpart L - Criteria for Evaluating a State's Proposed NEPA-Like Process

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... consider: (1) Designation of a study area comparable to the final system; (2) A range of feasible... conditions; (5) Land use and other social parameters including relevant recreation and open-space..., institutional, and industrial) within the project study area; and (8) Other anticipated public works projects...

  15. 40 CFR Appendix A to Subpart L of... - Criteria for Evaluating a State's Proposed NEPA-Like Process

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the SERP will adequately consider: (1) Designation of a study area comparable to the final system; (2... impacts; (4) Present and future conditions; (5) Land use and other social parameters including relevant... (residential, commercial, institutional, and industrial) within the project study area; and (8) Other...

  16. 40 CFR Appendix A to Subpart K of... - Criteria for evaluating a State's proposed NEPA-Like process

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SERP will adequately consider: (1) Designation of a study area comparable to the final system; (2) A...) Present and future conditions; (5) Land use and other social parameters including recreation and open... (residential, commercial, institutional and industrial) within the project study area; and (8) Other...

  17. 40 CFR Appendix A to Subpart K of... - Criteria for evaluating a State's proposed NEPA-Like process

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SERP will adequately consider: (1) Designation of a study area comparable to the final system; (2) A...) Present and future conditions; (5) Land use and other social parameters including recreation and open... (residential, commercial, institutional and industrial) within the project study area; and (8) Other...

  18. 40 CFR Appendix A to Subpart K of... - Criteria for evaluating a State's proposed NEPA-Like process

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... SERP will adequately consider: (1) Designation of a study area comparable to the final system; (2) A...) Present and future conditions; (5) Land use and other social parameters including recreation and open... (residential, commercial, institutional and industrial) within the project study area; and (8) Other...

  19. 40 CFR Appendix A to Subpart L of... - Criteria for Evaluating a State's Proposed NEPA-Like Process

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the SERP will adequately consider: (1) Designation of a study area comparable to the final system; (2... impacts; (4) Present and future conditions; (5) Land use and other social parameters including relevant... (residential, commercial, institutional, and industrial) within the project study area; and (8) Other...

  20. 40 CFR Appendix A to Subpart L - Criteria for Evaluating a State's Proposed NEPA-Like Process

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... consider: (1) Designation of a study area comparable to the final system; (2) A range of feasible... conditions; (5) Land use and other social parameters including relevant recreation and open-space..., institutional, and industrial) within the project study area; and (8) Other anticipated public works projects...

  1. 17 CFR Appendix B to Part 36 - Guidance on, and Acceptable Practices in, Compliance With Core Principles

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... decision-making process and the reasons for using its emergency action authority. Information on steps... have clear procedures and guidelines for decision-making regarding emergency intervention in the market, including procedures and guidelines to avoid conflicts of interest while carrying out such decision-making...

  2. Research grant handbook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This handbook prescribes policies and procedures relating to the award and administration of NASA research grants and cooperative agreements with educational institutions and other nonprofit organizations. The handbook is divided into six subparts: (1) general; (2) definitions; (3) the process; (4) provisions and special conditions; (5) administration; and (6) reports. The appendix includes a listing of exhibits.

  3. 43 CFR 2.85 - How much will I be charged?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for record production under 43 CFR part 2, appendix A. Costs must be paid by check or money order... INFORMATION ACT Legal Process: Testimony by Employees and Production of Records Responsibilities of Requesters § 2.85 How much will I be charged? We will charge you the costs, including travel expenses, for...

  4. 49 CFR Appendix C to Part 236 - Safety Assurance Criteria and Processes

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... system (all its elements including hardware and software) must be designed to assure safe operation with... unsafe errors in the software due to human error in the software specification, design, or coding phases... (hardware or software, or both) are used in combination to ensure safety. If a common mode failure exists...

  5. 40 CFR Appendix to Part 240 - Recommended Bibliography

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....S. Department of Health, Education, and Welfare, National Air Pollution Control Administration, 1969... FOR THE THERMAL PROCESSING OF SOLID WASTES Pt. 240, App. Appendix to Part 240—Recommended Bibliography...

  6. 40 CFR Appendix to Part 240 - Recommended Bibliography

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....S. Department of Health, Education, and Welfare, National Air Pollution Control Administration, 1969... FOR THE THERMAL PROCESSING OF SOLID WASTES Pt. 240, App. Appendix to Part 240—Recommended Bibliography...

  7. Preparing Students for Success in California's Community Colleges. Technical Appendix

    ERIC Educational Resources Information Center

    Mejia, Marisol Cuellar; Rodriguez, Olga; Johnson, Hans

    2016-01-01

    This document presents the technical appendix that accompanies the full report, "Preparing Students for Success in California's Community Colleges." The appendix includes Data and Methods. [Supported with funding from the Sutton Family Fund. For the full report, see ED570976.

  8. Environmental Impact Analysis Process. Draft Environmental Assessment. SAC Low-Altitude Flight Operations at the Airburst Range, Colorado

    DTIC Science & Technology

    1990-01-01

    Aircraft Descriptions Appendix D- Practice Munitions Appendix E : B-52/BDU-48 Drop Activities Appendix F: Definition of Noise Impacts Appendix G: Contact...in southcentral Colorado. 1.1 PURPOSE AN’) NEED 1.1.1 Low-Level Training Low-altitude flight operations a.- e essential to the Air Forec for a...strategic and tactical bombing, and strategic/t’. "cal air!*-".. Aircre,-, 91 (ct y is e nti" if the Air Force is to perform its assigned mission

  9. Classification of the terminal arterial vascularization of the appendix with a view to its use in reconstructive microsurgery.

    PubMed

    Ouattara, Djibril; Kipré, Yvan Zunon; Broalet, Esperance; Séri, Fréjuis Gotta; Angaté, Hervé Yangni; Bi N'Guessan, Gabriel Gnanazan; Kassanyou, Salami

    2007-12-01

    The aim of this study was to examine the arterial vascularization of the appendix, in order to propose a classification of the different vascular types of the appendix for the realization of free transfer in reconstructive microsurgery. We achieved the removal as a monobloc of the cecum, of a part of the ileum, and the upper colon, then conducted the intra-arterial injection of a mixture composed of minium, and went on to the dissection of 25 specimens of appendix from West Africa. We analyzed the appendicular territory vascularized by the different discovered arteries. The average length of the appendix was 10.5 cm, ranging from 6.5 to 13.5 cm. The vascularization of the appendix was guaranteed by three arteries: the main appendicular artery, the ceco-appendicular artery and by one or several appendicular accessory arteries. We found five types of vascularization of the appendix according to the number and type of artery needed to guarantee the vascularization of the whole of the appendix including its base. It is evident from this study that a detailed analysis of the vascularization of the appendix is necessary before its removal for a reconstructive microsurgery, because in three cases out of four, the transplant must include at least two vessels in order to guarantee the whole of its vascularization.

  10. Environmental Restoration - Expedient Methods and Technologies: A User Guide with Case Studies

    DTIC Science & Technology

    1998-03-01

    benzene, high fructose corn syrup , raw molasses, butane gas, sodium benzoate, or acetate. Enhanced anaerobic biodegradation of jet fuels in ground water...appendix discusses technology applications that are deemed impractical because of high cost, difficulty of use, or other factors. Also included is a...conversations with knowledgeable 1 Technologically sophisticated processes are not addressed in this study because of high cost, which includes the engineering

  11. 76 FR 38533 - Alphabetical Listings: Specially Designated Nationals and Blocked Persons; Blocked Vessels...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-30

    ...The Department of the Treasury's Office of Foreign Assets Control (``OFAC'') is amending 31 CFR chapter V to replace the list of persons (which includes individuals and entities) with whom transactions and dealings are prohibited by the various economic sanctions programs administered by OFAC that appears at Appendix A to 31 CFR chapter V with information on how to obtain up-to-date lists of such persons on OFAC's Web site or by other means. OFAC also is removing Appendix B to 31 CFR chapter V, which includes the names of certain blocked vessels. In addition, OFAC is amending its regulations for a number of the sanctions programs it administers to revise references to Appendix A and to remove references to Appendix B. Finally, OFAC is amending the Iranian Transactions Regulations, by republishing in alphabetical order the entire list of persons identified in Appendix A to 31 CFR Part 560, to reflect changes to the list since that appendix was last published.

  12. 29 CFR Appendix B to Part 510 - Nonmanufacturing Industries Eligible for Minimum Wage Phase-In

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 7374 1 Computer processing and data preparation and processing services. 7379 1 Computer related... industries (except those in major groups 01, 02, 08, and 09, pertaining to agriculture) for which data were... incorporated by reference in these regulations (§ 510.21). The data in this appendix are presented by major...

  13. 29 CFR Appendix B to Part 510 - Nonmanufacturing Industries Eligible for Minimum Wage Phase-In

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... 7374 1 Computer processing and data preparation and processing services. 7379 1 Computer related... industries (except those in major groups 01, 02, 08, and 09, pertaining to agriculture) for which data were... incorporated by reference in these regulations (§ 510.21). The data in this appendix are presented by major...

  14. Industrial Processes to Reduce Generation of Hazardous Waste at DoD facilities. Phase Report. Appendix A

    DTIC Science & Technology

    1985-12-01

    ITASK IWORK UNIT Roo 2󈧆 DELEMENT NO. NO. NO. IACCESSION NO ~2sI DC tn 200061 1 ift E (include Security Classification) Industrit I Processes to Reduice...SCRT LSIIAINO HSPG Bes Av ia l ther editions are obsolete. I iN 1 ALSs I F1 1- Bs Available INDUSTRIAL PROCESSES TO REDUCE GENERATION OF HAZARDOUS...Defense (DOD) by CH2M HILL and PEER Consultants, Inc., for the purpose of reducing hazardous waste generation from DOD industrial processes . It is not

  15. 105-KE Isolation Barrier Leak Rate Acceptance Test Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCracken, K.J.

    1995-06-14

    This Acceptance Test Report (ATR) contains the completed and signed Acceptance Procedure (ATP) for the 105-KE Isolations Barrier Leak Rate Test. The Test Engineer`s log, the completed sections of the ATP in the Appendix for Repeat Testing (Appendix K), the approved WHC J-7s (Appendix H), the data logger files (Appendices T and U), and the post test calibration checks (Appendix V) are included.

  16. The Future of Our Physics

    NASA Astrophysics Data System (ADS)

    Zichichi, Antonino

    The following sections are included: * Physics Problems * The Whole of our Knowledge * The Future * Appendices * Appendix A: Dirac - Antiparticles & Antimatter * Appendix B: Blackett - The discovery of the "Vacuum Polarization" (1932) [the 1st example of radiative effect: pre-the Lamb-shift (1947)] * Appendix C: The New Manhattan Project * References

  17. 20 CFR 220.134 - Medical-vocational guidelines in appendix 2 of this part.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Medical-vocational guidelines in appendix 2... THE RAILROAD RETIREMENT ACT DETERMINING DISABILITY Vocational Considerations § 220.134 Medical-vocational guidelines in appendix 2 of this part. (a) The Dictionary of Occupational Titles includes...

  18. 32 CFR Appendix D to Part 552 - Unauthorized Activities in Fort Lewis Maneuver Areas

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Areas D Appendix D to Part 552 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY... Appendix D to Part 552—Unauthorized Activities in Fort Lewis Maneuver Areas Civilian paramilitary...-detecting, including recovery of ammunition residue of fragments, archaeological or cultural artifacts, or...

  19. 40 CFR Appendix D to Subpart E of... - EPA Transition Policy-Existing Consulting Engineering Agreements

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Consulting Engineering Agreements D Appendix D to Subpart E of Part 35 Protection of Environment... Transition Policy—Existing Consulting Engineering Agreements a. access to records—audit 1. Access clause... access clause is included in the consulting engineering subagreement. The clause contained in appendix C...

  20. 40 CFR Appendix D to Subpart E of... - EPA Transition Policy-Existing Consulting Engineering Agreements

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Consulting Engineering Agreements D Appendix D to Subpart E of Part 35 Protection of Environment... Transition Policy—Existing Consulting Engineering Agreements a. access to records—audit 1. Access clause... access clause is included in the consulting engineering subagreement. The clause contained in appendix C...

  1. 40 CFR Appendix D to Subpart E of... - EPA Transition Policy-Existing Consulting Engineering Agreements

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Consulting Engineering Agreements D Appendix D to Subpart E of Part 35 Protection of Environment... Transition Policy—Existing Consulting Engineering Agreements a. access to records—audit 1. Access clause... access clause is included in the consulting engineering subagreement. The clause contained in appendix C...

  2. 40 CFR Appendix D to Subpart E of... - EPA Transition Policy-Existing Consulting Engineering Agreements

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Consulting Engineering Agreements D Appendix D to Subpart E of Part 35 Protection of Environment... Transition Policy—Existing Consulting Engineering Agreements a. access to records—audit 1. Access clause... access clause is included in the consulting engineering subagreement. The clause contained in appendix C...

  3. 40 CFR Appendix D to Subpart E of... - EPA Transition Policy-Existing Consulting Engineering Agreements

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Consulting Engineering Agreements D Appendix D to Subpart E of Part 35 Protection of Environment... Transition Policy—Existing Consulting Engineering Agreements a. access to records—audit 1. Access clause... access clause is included in the consulting engineering subagreement. The clause contained in appendix C...

  4. Antenna Test Facility (ATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Lin, Greg

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  5. Chamber B Thermal/Vacuum Chamber: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Montz, Mike E.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of Chamber B. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  6. Audio Development Laboratory (ADL) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Romero, Andy

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ADL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  7. Radiant Heat Test Facility (RHTF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    DelPapa, Steven

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the RHTF. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  8. Electronic Systems Test Laboratory (ESTL) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Robinson, Neil

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  9. Communication Systems Simulation Laboratory (CSSL): Simulation Planning Guide

    NASA Technical Reports Server (NTRS)

    Schlesinger, Adam

    2012-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the CSSL. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  10. Advanced Materials Laboratory User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Orndoff, Evelyne

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the Advanced Materials Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  11. Structures Test Laboratory (STL). User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Zipay, John J.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the STL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  12. Systems Engineering Simulator (SES) Simulator Planning Guide

    NASA Technical Reports Server (NTRS)

    McFarlane, Michael

    2011-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the SES. The Simulator Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  13. Computational Electromagnetics (CEM) Laboratory: Simulation Planning Guide

    NASA Technical Reports Server (NTRS)

    Khayat, Michael A.

    2011-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the CEM Laboratory. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  14. 40 CFR Table 4 to Subpart Dddd of... - Requirements for Performance Tests

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... THC compliance option measure emissions of total HAP as THC Method 25A in appendix A to 40 CFR part 60... the methane emissions from the emissions of total HAP as THC. (6) each process unit subject to a... § 63.2240(c) establish the site-specific operating requirements (including the parameter limits or THC...

  15. 40 CFR Table 4 to Subpart Dddd of... - Requirements for Performance Tests

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... THC compliance option measure emissions of total HAP as THC Method 25A in appendix A to 40 CFR part 60... the methane emissions from the emissions of total HAP as THC. (6) each process unit subject to a... § 63.2240(c) establish the site-specific operating requirements (including the parameter limits or THC...

  16. Upward Mobility Programs in the Service Sector for Disadvantaged and Dislocated Workers. Volume II: Technical Appendices.

    ERIC Educational Resources Information Center

    Tao, Fumiyo; And Others

    This volume contains technical and supporting materials that supplement Volume I, which describes upward mobility programs for disadvantaged and dislocated workers in the service sector. Appendix A is a detailed description of the project methodology, including data collection methods and information on data compilation, processing, and analysis.…

  17. 14 CFR Appendix E to Part 60 - Qualification Performance Standards for Quality Management Systems for Flight Simulation Training...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... data made available to the NSPM (the validation data package) includes the aircraft manufacturer's... longer in business), and if appropriate, with the person who supplied the aircraft data package for the FFS for the purposes of receiving notification of data package changes. E1.13. A policy, process, or...

  18. 14 CFR Appendix E to Part 60 - Qualification Performance Standards for Quality Management Systems for Flight Simulation Training...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... data made available to the NSPM (the validation data package) includes the aircraft manufacturer's... longer in business), and if appropriate, with the person who supplied the aircraft data package for the FFS for the purposes of receiving notification of data package changes. E1.13. A policy, process, or...

  19. Standard CMMI Appraisal Method for Process Improvement (SCAMPI) A, Version 1.3: Method Definition Document

    DTIC Science & Technology

    2011-03-01

    performance of Federal Government Contract Number FA8721-05- C -0003 with Carnegie Mellon University for the operation of the Software Engineering... C Roles and Responsibilities 195 Appendix D Reporting Requirements and Options 201 Appendix E Managed Discovery 203 Appendix F Scoping and...Upgrade Team (SUT) • Mary Busby , Lockheed Martin • Palma Buttles-Valdez, Software Engineering Institute • Paul Byrnes, Integrated System Diagnostics

  20. Choosing Between Public and Private Providers of Depot Maintenance: A Proposed New Approach

    DTIC Science & Technology

    1997-09-01

    Appendix A Mathematical Form of the Model Appendix B Assumed Distributions for Evaluation Factors vm Contents Appendix C Trial Evaluation Workbook ...Figure 4-2. Revised Factor Scale Anchors 4-5 Figure 4-3. Workbook Display Establishing Relevance of Factor 4-5 Figure 4-4. Comparing Results of...Introduction process. To fill voids we conducted additional research in the areas of classical microeconomics , transaction cost economics, public

  1. An Annotated Bibliography of Patents Related to Coastal Engineering. Volume III. 1974-1976. Appendix.

    DTIC Science & Technology

    1979-11-01

    infrared detectors produce signals which are proportional to the detected reflected radia- tion at the wavelengths k, and A,. A processing channel is con...instrument including an oscillator for sup- T___ plying AC energy to a transducer. The oscillator is keyed on /I by a multvibrator which produces clock pulses... includes dams including such units when installed, and methods of damming water flow. o- 3.786.640 .MEANS AND METHOD FOR PRODUCING STEPPED CONCRETE SLOPE

  2. T1 bright appendix sign to exclude acute appendicitis in pregnant women.

    PubMed

    Shin, Ilah; An, Chansik; Lim, Joon Seok; Kim, Myeong-Jin; Chung, Yong Eun

    2017-08-01

    To evaluate the diagnostic value of the T1 bright appendix sign for the diagnosis of acute appendicitis in pregnant women. This retrospective study included 125 pregnant women with suspected appendicitis who underwent magnetic resonance (MR) imaging. The T1 bright appendix sign was defined as a high intensity signal filling more than half length of the appendix on T1-weighted imaging. Sensitivity, specificity, positive predictive value (PPV) and negative predictive value (NPV) of the T1 bright appendix sign for normal appendix identification were calculated in all patients and in those with borderline-sized appendices (6-7 mm). The T1 bright appendix sign was seen in 51% of patients with normal appendices, but only in 4.5% of patients with acute appendicitis. The overall sensitivity, specificity, PPV, and NPV of the T1 bright appendix sign for normal appendix diagnosis were 44.9%, 95.5%, 97.6%, and 30.0%, respectively. All four patients with borderline sized appendix with appendicitis showed negative T1 bright appendix sign. The T1 bright appendix sign is a specific finding for the diagnosis of a normal appendix in pregnant women with suspected acute appendicitis. • Magnetic resonance imaging is increasingly used in emergency settings. • Acute appendicitis is the most common cause of acute abdomen. • Magnetic resonance imaging is widely used in pregnant population. • T1 bright appendix sign can be a specific sign representing normal appendix.

  3. 32 CFR Appendix D to Subpart M of... - Unauthorized Activities in Maneuver Training Areas

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Areas D Appendix D to Subpart M of Part 552 National Defense Department of Defense (Continued.... D Appendix D to Subpart M of Part 552—Unauthorized Activities in Maneuver Training Areas 1. Fort... metal-detecting, including recovery of ammunition residue or fragments, archaeological or cultural...

  4. Taking the Lead in Science Education: Forging Next-Generation Science Standards. International Science Benchmarking Report. Appendix

    ERIC Educational Resources Information Center

    Achieve, Inc., 2010

    2010-01-01

    This appendix accompanies the report "Taking the Lead in Science Education: Forging Next-Generation Science Standards. International Science Benchmarking Report," a study conducted by Achieve to compare the science standards of 10 countries. This appendix includes the following: (1) PISA and TIMSS Assessment Rankings; (2) Courses and…

  5. 15 CFR Appendix A to Part 946 - National Weather Service Modernization Criteria

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... specifically in Addendum I, Appendix D of the ASOS Site Component Commissioning Evaluation Package (the ASOS Package). Criteria: a. ASOS Acceptance Test: The site component acceptance test, which includes objective..., has been successfully completed in accordance with item 1a, p. D-2 of Appendix D of the ASOS Package...

  6. 15 CFR Appendix A to Part 946 - National Weather Service Modernization Criteria

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... specifically in Addendum I, Appendix D of the ASOS Site Component Commissioning Evaluation Package (the ASOS Package). Criteria: a. ASOS Acceptance Test: The site component acceptance test, which includes objective..., has been successfully completed in accordance with item 1a, p. D-2 of Appendix D of the ASOS Package...

  7. 15 CFR Appendix A to Part 946 - National Weather Service Modernization Criteria

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... specifically in Addendum I, Appendix D of the ASOS Site Component Commissioning Evaluation Package (the ASOS Package). Criteria: a. ASOS Acceptance Test: The site component acceptance test, which includes objective..., has been successfully completed in accordance with item 1a, p. D-2 of Appendix D of the ASOS Package...

  8. 15 CFR Appendix A to Part 946 - National Weather Service Modernization Criteria

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... specifically in Addendum I, Appendix D of the ASOS Site Component Commissioning Evaluation Package (the ASOS Package). Criteria: a. ASOS Acceptance Test: The site component acceptance test, which includes objective..., has been successfully completed in accordance with item 1a, p. D-2 of Appendix D of the ASOS Package...

  9. Standard CMMI (Registered Trademark) Appraisal Method for Process Improvement (SCAMPI (Service Mark)) A, Version 1.3: Method Definition Document

    DTIC Science & Technology

    2011-03-01

    performance of Federal Government Contract Number FA8721-05- C -0003 with Carnegie Mellon University for the operation of the Software Engineering... C Roles and Responsibilities 195 Appendix D Reporting Requirements and Options 201 Appendix E Managed Discovery 203 Appendix F Scoping and...Upgrade Team (SUT) • Mary Busby , Lockheed Martin • Palma Buttles-Valdez, Software Engineering Institute • Paul Byrnes, Integrated System Diagnostics

  10. 30 CFR 254.28 - What information must I include in the “In situ burning plan” appendix?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What information must I include in the âIn situ... include in the “In situ burning plan” appendix? Your in situ burning plan must be consistent with any... situ burning plan must include: (a) A description of the in situ burn equipment including its...

  11. Recurrence Interval and Event Age Data for Type A Faults

    USGS Publications Warehouse

    Dawson, Timothy E.; Weldon, Ray J.; Biasi, Glenn P.

    2008-01-01

    This appendix summarizes available recurrence interval, event age, and timing of most recent event data for Type A faults considered in the Earthquake Rate Model 2 (ERM 2) and used in the ERM 2 Appendix C analysis as well as Appendix N (time-dependent probabilities). These data have been compiled into an Excel workbook named Appendix B A-fault event ages_recurrence_V5.0 (herein referred to as the Appendix B workbook). For convenience, the Appendix B workbook is attached to the end of this document as a series of tables. The tables within the Appendix B workbook include site locations, event ages, and recurrence data, and in some cases, the interval of time between earthquakes is also reported. The Appendix B workbook is organized as individual worksheets, with each worksheet named by fault and paleoseismic site. Each worksheet contains the site location in latitude and longitude, as well as information on event ages, and a summary of recurrence data. Because the data has been compiled from different sources with different presentation styles, descriptions of the contents of each worksheet within the Appendix B spreadsheet are summarized.

  12. Bosonization in Space-Time

    NASA Astrophysics Data System (ADS)

    Stone, Michael

    The following sections are included: * Introduction * Free Fermi Fields * Free Bosons * The Bosonization Rules * A Quantum Pythagoras Theorem * Appendix 1A. Complex Coordinates * Appendix IB. Conformal Symmetry * References

  13. TIM Version 3.0 beta Technical Description and User Guide - Appendix B - Example input file for TIMv3.0

    EPA Pesticide Factsheets

    Terrestrial Investigation Model, TIM, has several appendices to its user guide. This is the appendix that includes an example input file in its preserved format. Both parameters and comments defining them are included.

  14. 40 CFR Table 4 to Subpart Dddd of... - Requirements for Performance Tests

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... HAP as THC compliance option measure emissions of total HAP as THC Method 25A in appendix A to 40 CFR... subtract the methane emissions from the emissions of total HAP as THC. (6) each process unit subject to a... § 63.2240(c) establish the site-specific operating requirements (including the parameter limits or THC...

  15. 40 CFR Table 4 to Subpart Dddd of... - Requirements for Performance Tests

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... HAP as THC compliance option measure emissions of total HAP as THC Method 25A in appendix A to 40 CFR... subtract the methane emissions from the emissions of total HAP as THC. (6) each process unit subject to a... § 63.2240(c) establish the site-specific operating requirements (including the parameter limits or THC...

  16. 40 CFR Table 4 to Subpart Dddd of... - Requirements for Performance Tests

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... HAP as THC compliance option measure emissions of total HAP as THC Method 25A in appendix A to 40 CFR... subtract the methane emissions from the emissions of total HAP as THC. (6) each process unit subject to a... § 63.2240(c) establish the site-specific operating requirements (including the parameter limits or THC...

  17. 12 CFR Appendix C to Part 1024 - Instructions for Completing Good Faith Estimate (GFE) Form

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., including for application, processing, or underwriting. The amount stated in Block 1 is subject to zero... chosen is zero), the mortgage broker must insert “0” in Block 2 and may check either the box indicating... subject to zero tolerance while the interest rate is locked, i.e., any credit for the interest rate chosen...

  18. 12 CFR Appendix C to Part 1024 - Instructions for Completing Good Faith Estimate (GFE) Form

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., including for application, processing, or underwriting. The amount stated in Block 1 is subject to zero... chosen is zero), the mortgage broker must insert “0” in Block 2 and may check either the box indicating... subject to zero tolerance while the interest rate is locked, i.e., any credit for the interest rate chosen...

  19. 12 CFR Appendix C to Part 1024 - Instructions for Completing Good Faith Estimate (GFE) Form

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., including for application, processing, or underwriting. The amount stated in Block 1 is subject to zero... chosen is zero), the mortgage broker must insert “0” in Block 2 and may check either the box indicating... subject to zero tolerance while the interest rate is locked, i.e., any credit for the interest rate chosen...

  20. 41 CFR Appendix B to Part 102 - 37-Elements of a State Plan of Operation

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Plan of Operation B Appendix B to Part 102 Public Contracts and Property Management Federal Property... SURPLUS PERSONAL PROPERTY Pt. 102-37, App. B Appendix B to Part 102-37—Elements of a State Plan of... title of the State official who directly supervises the State agent. (b) Operational authority Include...

  1. 49 CFR Appendix A to Part 605 - Appendix A to Part 605

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS Pt. 605, App. A Appendix A to Part 605 Comptroller General... the City originally included in its grant application a request for funds to purchase 8 buses designed... answered in the order presented. Number one: “The grant of funds to a City to purchase buses and equipment...

  2. 49 CFR Appendix A to Part 605 - Appendix A to Part 605

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS Pt. 605, App. A Appendix A to Part 605 Comptroller General... the City originally included in its grant application a request for funds to purchase 8 buses designed... answered in the order presented. Number one: “The grant of funds to a City to purchase buses and equipment...

  3. Appendix: Marketing and Student Recruitment Practices for Master's-Level Graduate Programs, 2012. Trends in Enrollment Management

    ERIC Educational Resources Information Center

    Noel-Levitz, Inc, 2012

    2012-01-01

    This paper presents the appendix to "Marketing and Student Recruitment Practices for Master's-Level Graduate Programs, 2012" report. Included in this appendix are: (1) Ratings of the primary practices measured in this study, displayed by institution type; (2) The practice of purchasing prospective student names and addresses; (3) Ratings of…

  4. Precision Cosmology

    NASA Astrophysics Data System (ADS)

    Jones, Bernard J. T.

    2017-04-01

    Preface; Notation and conventions; Part I. 100 Years of Cosmology: 1. Emerging cosmology; 2. The cosmic expansion; 3. The cosmic microwave background; 4. Recent cosmology; Part II. Newtonian Cosmology: 5. Newtonian cosmology; 6. Dark energy cosmological models; 7. The early universe; 8. The inhomogeneous universe; 9. The inflationary universe; Part III. Relativistic Cosmology: 10. Minkowski space; 11. The energy momentum tensor; 12. General relativity; 13. Space-time geometry and calculus; 14. The Einstein field equations; 15. Solutions of the Einstein equations; 16. The Robertson-Walker solution; 17. Congruences, curvature and Raychaudhuri; 18. Observing and measuring the universe; Part IV. The Physics of Matter and Radiation: 19. Physics of the CMB radiation; 20. Recombination of the primeval plasma; 21. CMB polarisation; 22. CMB anisotropy; Part V. Precision Tools for Precision Cosmology: 23. Likelihood; 24. Frequentist hypothesis testing; 25. Statistical inference: Bayesian; 26. CMB data processing; 27. Parametrising the universe; 28. Precision cosmology; 29. Epilogue; Appendix A. SI, CGS and Planck units; Appendix B. Magnitudes and distances; Appendix C. Representing vectors and tensors; Appendix D. The electromagnetic field; Appendix E. Statistical distributions; Appendix F. Functions on a sphere; Appendix G. Acknowledgements; References; Index.

  5. Losing Thomas & Ella: A Father's Story (A Research Comic).

    PubMed

    Weaver-Hightower, Marcus B

    2017-09-01

    "Losing Thomas & Ella" presents a research comic about one father's perinatal loss of twins. The comic recounts Paul's experience of the hospital and the babies' deaths, and it details the complex grieving process afterward, including themes of anger, distance, relationship stress, self-blame, religious challenges, and resignation. A methodological appendix explains the process of constructing the comic and provides a rationale for the use of comics-based research for illness, death, and grief among practitioners, policy makers, and the bereaved.

  6. Porphyry copper assessment of Europe, exclusive of the Fennoscandian Shield: Chapter K in Global mineral resource assessment

    USGS Publications Warehouse

    Sutphin, David M.; Hammarstrom, Jane M.; Drew, Lawrence J.; Large, Duncan E.; Berger, Byron R.; Dicken, Connie L.; DeMarr, Michael W.; with contributions from Billa, Mario; Briskey, Joseph A.; Cassard, Daniel; Lips, Andor; Pertold, Zdeněk; Roşu, Emilian

    2013-01-01

    The assessment includes an overview with summary tables. Detailed descriptions of each tract, including the rationales for delineation and assessment, are given in appendixes A–G. Appendix H describes a geographic information system (GIS) that includes tract boundaries and point locations of known porphyry copper deposits and significant prospects.

  7. An Analysis of Full Scale Measurements on M/V Stewart J. Cort during the 1979 and 1980 Trial Programs. Parts I and II.

    DTIC Science & Technology

    1982-02-01

    IKCuNITY CLASSIFICATION OF Tm4iS IMAGE (Vrhn Dot& Entered) .,.-’- . . . . . ... .. ... " . . ...... ....... .. . . . . . . . . TABLE OF CONTENTS...11-19 APPENDIX D: BASIC PROCESSING ............................... 11-21 APPENDIX E: SIMULATION OF DATA...equipment previously developed, and an on-board data processing system. These full scale ship trials were the first in history with the objective of directly

  8. Defense Logistics Agency Can Improve Its Product Quality Deficiency Report Processing

    DTIC Science & Technology

    2015-07-01

    Contracts for M2 Machine Gun Spare Parts in Support of Operations in Southwest Asia,” January 11, 2010 Appendixes DODIG-2015-140 │ 29 Appendix B...personnel are adequately processing product quality deficiency reports and identifying the root cause for defective spare parts . This is the first...quality deficiency report program and prevents meaningful analysis of the primary causes of spare- part quality deficiencies. In addition, the

  9. Potash: a global overview of evaporate-related potash resources, including spatial databases of deposits, occurrences, and permissive tracts: Chapter S in Global mineral resource assessment

    USGS Publications Warehouse

    Orris, Greta J.; Cocker, Mark D.; Dunlap, Pamela; Wynn, Jeff C.; Spanski, Gregory T.; Briggs, Deborah A.; Gass, Leila; Bliss, James D.; Bolm, Karen S.; Yang, Chao; Lipin, Bruce R.; Ludington, Stephen; Miller, Robert J.; Słowakiewicz, Mirosław

    2014-01-01

    This report describes a global, evaporite-related potash deposits and occurrences database and a potash tracts database. Chapter 1 summarizes potash resource history and use. Chapter 2 describes a global potash deposits and occurrences database, which contains more than 900 site records. Chapter 3 describes a potash tracts database, which contains 84 tracts with geology permissive for the presence of evaporite-hosted potash resources, including areas with active evaporite-related potash production, areas with known mineralization that has not been quantified or exploited, and areas with potential for undiscovered potash resources. Chapter 4 describes geographic information system (GIS) data files that include (1) potash deposits and occurrences data, (2) potash tract data, (3) reference databases for potash deposit and tract data, and (4) representative graphics of geologic features related to potash tracts and deposits. Summary descriptive models for stratabound potash-bearing salt and halokinetic potash-bearing salt are included in appendixes A and B, respectively. A glossary of salt- and potash-related terms is contained in appendix C and a list of database abbreviations is given in appendix D. Appendix E describes GIS data files, and appendix F is a guide to using the geodatabase.

  10. Geosoft eXecutables (GX's) Developed by the U.S. Geological Survey, Version 2.0, with Notes on GX Development from Fortran Code

    USGS Publications Warehouse

    Phillips, Jeffrey D.

    2007-01-01

    Introduction Geosoft executables (GX's) are custom software modules for use with the Geosoft Oasis montaj geophysical data processing system, which currently runs under the Microsoft Windows 2000 or XP operating systems. The U.S. Geological Survey (USGS) uses Oasis montaj primarily for the processing and display of airborne geophysical data. The ability to add custom software modules to the Oasis montaj system is a feature employed by the USGS in order to take advantage of the large number of geophysical algorithms developed by the USGS during the past half century. This main part of this report, along with Appendix 1, describes Version 2.0 GX's developed by the USGS or specifically for the USGS by contractors. These GX's perform both basic and advanced operations. Version 1.0 GX's developed by the USGS were described by Phillips and others (2003), and are included in Version 2.0. Appendix 1 contains the help files for the individual GX's. Appendix 2 describes the new method that was used to create the compiled GX files, starting from legacy Fortran source code. Although the new method shares many steps with the approach presented in the Geosoft GX Developer manual, it differs from that approach in that it uses free, open-source Fortran and C compilers and avoids all Fortran-to-C conversion.

  11. Vibration and Acoustic Test Facility (VATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Fantasia, Peter M.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the VATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  12. Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Stokes, LeBarian

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  13. Materials and Nondestructive Evaluation Laboratoriers: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Schaschl, Leslie

    2011-01-01

    The Materials and Nondestructive Evaluation Laboratory process, milestones and inputs are unknowns to first-time users. The Materials and Nondestructive Evaluation Laboratory Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware developers. It is intended to assist their project engineering personnel in materials analysis planning and execution. Material covered includes a roadmap of the analysis process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define scope of analysis, cost, and schedule are included as an appendix to the guide.

  14. Specialized Environmental Chamber Test Complex: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Montz, Michael E.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the Specialized Environmental Test Complex. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  15. Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF). User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ARMSEF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  16. Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Salinas, Michael

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  17. Electromagnetic Interference/Compatibility (EMI/EMC) Control Test and Measurement Facility: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Scully, Robert C.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  18. 32 CFR Appendix to Part 281 - Claims Description

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... advance decision functions for claims under the following statutes: (a) 31 U.S.C. 3702, concerning claims... SETTLING PERSONNEL AND GENERAL CLAIMS AND PROCESSING ADVANCE DECISION REQUESTS Pt. 281, App. Appendix to... Personnel Management performs these functions for claims involving civilian employees' compensation and...

  19. 50 CFR 23.26 - When is a U.S. or foreign CITES document valid?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Registered commercial breeding operation for Appendix-I wildlife (i) The operation is included in the... document. (16) Registered commercial nursery for Appendix-I plants The operation is included in the... IMPORTATION OF WILDLIFE AND PLANTS (CONTINUED) CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD...

  20. 50 CFR 23.26 - When is a U.S. or foreign CITES document valid?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Registered commercial breeding operation for Appendix-I wildlife (i) The operation is included in the... document. (16) Registered commercial nursery for Appendix-I plants The operation is included in the... IMPORTATION OF WILDLIFE AND PLANTS (CONTINUED) CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD...

  1. 50 CFR 23.26 - When is a U.S. or foreign CITES document valid?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Registered commercial breeding operation for Appendix-I wildlife (i) The operation is included in the... document. (16) Registered commercial nursery for Appendix-I plants The operation is included in the... IMPORTATION OF WILDLIFE AND PLANTS (CONTINUED) CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD...

  2. 50 CFR 23.26 - When is a U.S. or foreign CITES document valid?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Registered commercial breeding operation for Appendix-I wildlife (i) The operation is included in the... document. (16) Registered commercial nursery for Appendix-I plants The operation is included in the... IMPORTATION OF WILDLIFE AND PLANTS (CONTINUED) CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD...

  3. 5 CFR Appendix B to Part 2634 - Certificate of Compliance (Form Approved: OMB Control No. 3209-0007)

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...: OMB Control No. 3209-0007) B Appendix B to Part 2634 Administrative Personnel OFFICE OF GOVERNMENT... DIVESTITURE Pt. 2634, App. B Appendix B to Part 2634—Certificate of Compliance (Form Approved: OMB Control No... the Act, the implementing regulations (including 5 CFR 2634.408(d)(1)(i)), or the trust instrument; (B...

  4. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  5. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  6. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  7. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  8. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  9. 16 CFR Appendix F2 to Part 305 - Compact Clothes Washers

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 1 2014-01-01 2014-01-01 false Compact Clothes Washers F2 Appendix F2 to... LABELING RULEâ) Pt. 305, App. F2 Appendix F2 to Part 305—Compact Clothes Washers Range Information “Compact” includes all household clothes washers with a tub capacity of less than 1.6 cu. ft. Capacity Range of...

  10. 16 CFR Appendix F1 to Part 305 - Standard Clothes Washers

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 1 2014-01-01 2014-01-01 false Standard Clothes Washers F1 Appendix F1 to... LABELING RULEâ) Pt. 305, App. F1 Appendix F1 to Part 305—Standard Clothes Washers Range Information “Standard” includes all household clothes washers with a tub capacity of 1.6 cu. ft. or more. Capacity Range...

  11. Final report from VFL Technologies for the pilot-scale thermal treatment of Lower East Fork Poplar Creek floodplain soils. LEFPC appendices. Volume 5. Appendix V-D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-09-01

    This final report from VFL Technologies for the pilot-scale thermal treatment of lower East Fork Poplar Creek floodplain soils dated September 1994 contains LEFPC Appendices, Volume 5, Appendix V - D. This appendix includes the final verification run data package (PAH, TCLP herbicides, TCLP pesticides).

  12. Database interfaces on NASA's heterogeneous distributed database system

    NASA Technical Reports Server (NTRS)

    Huang, Shou-Hsuan Stephen

    1989-01-01

    The syntax and semantics of all commands used in the template are described. Template builders should consult this document for proper commands in the template. Previous documents (Semiannual reports) described other aspects of this project. Appendix 1 contains all substituting commands used in the system. Appendix 2 includes all repeating commands. Appendix 3 is a collection of DEFINE templates from eight different DBMS's.

  13. 16 CFR Appendix A to Part 660 - Interagency Guidelines Concerning the Accuracy and Integrity of Information Furnished to Consumer...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... incorrectly reflected in a consumer report; thus, the furnished information should: (A) Include appropriate... Accuracy and Integrity of Information Furnished to Consumer Reporting Agencies A Appendix A to Part 660... INFORMATION TO CONSUMER REPORTING AGENCIES (eff. 07-01-10) Pt. 660, App. A Appendix A to Part 660—Interagency...

  14. 40 CFR Appendix Xii to Part 86 - Tables for Production Compliance Auditing of Heavy-Duty Engines and Heavy-Duty Vehicles...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Tables for Production Compliance Auditing of Heavy-Duty Engines and Heavy-Duty Vehicles, Including Light-Duty Trucks XII Appendix XII to... Appendix XII to Part 86—Tables for Production Compliance Auditing of Heavy-Duty Engines and Heavy-Duty...

  15. 23 CFR Appendix C to Subpart A of... - Federal-Aid Highway Contractors Annual EEO Report (Form PR-1391)

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Federal-Aid Highway Contractors Annual EEO Report (Form PR-1391) C Appendix C to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF... Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. C Appendix C to Subpart A of...

  16. 12 CFR Appendix H to Part 222 - Appendix H-Model Forms for Risk-Based Pricing and Credit Score Disclosure Exception Notices

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... appendix are models; their use is optional. 3. A person may change the forms by rearranging the format or... when rearranging the format of the model forms. a. Acceptable changes include, for example: i. Corrections or updates to telephone numbers, mailing addresses, or Web site addresses that may change over...

  17. Test of acoustic tone source and propulsion performance of C8A Buffalo suppressor nozzle

    NASA Technical Reports Server (NTRS)

    Marrs, C. C.; Harkonen, D. L.; Okeefe, J. V.

    1974-01-01

    Results are presented for a static acoustic and propulsion performance ground test conducted at the Boeing hot nozzle facility on the C8A Buffalo noise suppressor nozzle. Various methods to remove a nozzle-associated 2000-Hz tone are evaluated. Results of testing this rectangular-array lobed nozzle for propulsion performance and acoustic directivity are reported. Recommendations for future nozzle modifications and further testing are included. Appendix A contains the test plan. Appendix B presents the test log. Appendix C contains plots of the one-third octave sound pressure levels recorded during the test. Appendix D describes the acoustic data recording and reduction systems. The performance data is tabulated in Appendix E.

  18. Installation restoration program. Site investigation report. Revision 4. Volume 2: Appendix B through Appendix E. 155th Air Refueling Group, Nebraska Air National Guard, Lincoln Municipal Airport, Lincoln, Nebraska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    This is Site investigation Report, Volume 2 Appendix B through E. A Site Investigation was performed at the 155th Air Refueling Group at Lincoln, NE to evaluate six areas of suspected contamination identified during a Preliminary Assessment. The sites that this investigation were conducted at are: Site 1 - Fuel Farm, POL Storage Area Site 2 - West End of Old Oak Creek, Site 3 - Former Tank Cleaning/Hazardous Waste Storage Area, Site 4 - Access Road, Dust Control Area, Site 5 - Army National Guard Oil Storage Area, and Site 6 - Hydraulic Pressure Check Unit Storage Area. Themore » report recommended no further action for Sites 3 through 6 due to low levels or no contamination being found. The report recommended that the portion of Site 2 that is located downstream of Site 1 should be included in Site 1. Appendix 2 consist of the following appendix: Well Data and Geologic Boring Logs (Appendix B), Survey Data (Appendix C), Quality Control (Appendix D), and Analytical Results (Appendix E).« less

  19. Second Generation Integrated Composite Analyzer (ICAN) Computer Code

    NASA Technical Reports Server (NTRS)

    Murthy, Pappu L. N.; Ginty, Carol A.; Sanfeliz, Jose G.

    1993-01-01

    This manual updates the original 1986 NASA TP-2515, Integrated Composite Analyzer (ICAN) Users and Programmers Manual. The various enhancements and newly added features are described to enable the user to prepare the appropriate input data to run this updated version of the ICAN code. For reference, the micromechanics equations are provided in an appendix and should be compared to those in the original manual for modifications. A complete output for a sample case is also provided in a separate appendix. The input to the code includes constituent material properties, factors reflecting the fabrication process, and laminate configuration. The code performs micromechanics, macromechanics, and laminate analyses, including the hygrothermal response of polymer-matrix-based fiber composites. The output includes the various ply and composite properties, the composite structural response, and the composite stress analysis results with details on failure. The code is written in FORTRAN 77 and can be used efficiently as a self-contained package (or as a module) in complex structural analysis programs. The input-output format has changed considerably from the original version of ICAN and is described extensively through the use of a sample problem.

  20. The San Francisco Bay - Delta Wastewater and Residual Solids Management Study. Volume III. Technical Appendix. Wastewater Residual Solids Management Study

    DTIC Science & Technology

    1972-08-01

    of public health hazards and may alter reuse approaches to de -emphasize the fertilizer uses of these sludges because of the heavy metals involved...materials are removed with organic sludges, or lime sludges where that process is used. Toxic solids would typically include phenols and heavy metals , 80...solids would typically include phenols and heavy metals , 80 percent and 40 percent respectively being removable with the organic sludges. - 8

  1. 30 CFR 254.28 - What information must I include in the “In situ burning plan” appendix?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What information must I include in the âIn situ... information must I include in the “In situ burning plan” appendix? Your in situ burning plan must be... Contingency Plan(s). Your in situ burning plan must include: (a) A description of the in situ burn equipment...

  2. 30 CFR 254.28 - What information must I include in the “In situ burning plan” appendix?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What information must I include in the âIn situ... information must I include in the “In situ burning plan” appendix? Your in situ burning plan must be... Contingency Plan(s). Your in situ burning plan must include: (a) A description of the in situ burn equipment...

  3. 30 CFR 254.28 - What information must I include in the “In situ burning plan” appendix?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What information must I include in the âIn situ... information must I include in the “In situ burning plan” appendix? Your in situ burning plan must be... Contingency Plan(s). Your in situ burning plan must include: (a) A description of the in situ burn equipment...

  4. 30 CFR 254.28 - What information must I include in the “In situ burning plan” appendix?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What information must I include in the âIn situ... § 254.28 What information must I include in the “In situ burning plan” appendix? Your in situ burning... appropriate Area Contingency Plan(s). Your in situ burning plan must include: (a) A description of the in situ...

  5. Image Display and Manipulation System (IDAMS) program documentation, Appendixes A-D. [including routines, convolution filtering, image expansion, and fast Fourier transformation

    NASA Technical Reports Server (NTRS)

    Cecil, R. W.; White, R. A.; Szczur, M. R.

    1972-01-01

    The IDAMS Processor is a package of task routines and support software that performs convolution filtering, image expansion, fast Fourier transformation, and other operations on a digital image tape. A unique task control card for that program, together with any necessary parameter cards, selects each processing technique to be applied to the input image. A variable number of tasks can be selected for execution by including the proper task and parameter cards in the input deck. An executive maintains control of the run; it initiates execution of each task in turn and handles any necessary error processing.

  6. 7 CFR Appendix A to Part 3434 - List of Agriculture-Related Fields

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false List of Agriculture-Related Fields A Appendix A to Part 3434 Agriculture Regulations of the Department of Agriculture (Continued) NATIONAL INSTITUTE OF FOOD AND AGRICULTURE HISPANIC-SERVING AGRICULTURAL COLLEGES AND UNIVERSITIES CERTIFICATION PROCESS...

  7. 31 CFR Appendix A to Part 132 - Model Notice

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... THE TREASURY PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING Pt. 132, App. A Appendix A to Part... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  8. 31 CFR Appendix A to Part 132 - Model Notice

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... THE TREASURY PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING Pt. 132, App. A Appendix A to Part... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  9. 31 CFR Appendix A to Part 132 - Model Notice

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... THE TREASURY PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING Pt. 132, App. A Appendix A to Part... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  10. 31 CFR Appendix A to Part 132 - Model Notice

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... THE TREASURY PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING Pt. 132, App. A Appendix A to Part... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  11. DOD Financial Management: Improvement Needed in DOD Components’ Implementation of Audit Readiness Effort

    DTIC Science & Technology

    2011-09-01

    DOD Financial Management Abbreviations AFB Air Force Base COSO Committee of Sponsoring Organizations of the Treadway... Management and mismanagement.11 All of DOD’s programs on GAO’s High- Risk List relate to its business operations, including systems and processes... Management maintains audit readiness through risk -based periodic testing of internal controls utilizing the OMB Circular No. A-123, Appendix A

  12. Windshear detection radar signal processing studies

    NASA Technical Reports Server (NTRS)

    Baxa, Ernest G., Jr.

    1993-01-01

    This final report briefly summarizes research work at Clemson in the Radar Systems Laboratory under the NASA Langley Research Grant NAG-1-928 in support of the Antenna and Microwave Branch, Guidance and Control Division, program to develop airborne sensor technology for the detection of low altitude windshear. A bibliography of all publications generated by Clemson personnel is included. An appendix provides abstracts of all publications.

  13. Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report Kennedy Space Center, Florida

    NASA Technical Reports Server (NTRS)

    Johnson, Jill W. (Compiler)

    2015-01-01

    This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.

  14. Observer Comments Provided at the Peer Consultation Workshop (Appendix E)

    EPA Pesticide Factsheets

    The peer consultation workshop included three observer comment periods, one on the first day of the workshop and two on the second day of the workshop. This appendix includes verbatim transcripts (to the extent that specific remarks were audible from recordings) of the observer comments, in the order the comments were given.

  15. 50 CFR 23.26 - When is a U.S. or foreign CITES document valid?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Registered commercial breeding operation for Appendix-I wildlife (i) The operation is included in the... document. (16) Registered commercial nursery for Appendix-I plants The operation is included in the... Secretariat and that the purpose of the import is commercial. (8) The import of a specimen designated as bred...

  16. Conditional, Time-Dependent Probabilities for Segmented Type-A Faults in the WGCEP UCERF 2

    USGS Publications Warehouse

    Field, Edward H.; Gupta, Vipin

    2008-01-01

    This appendix presents elastic-rebound-theory (ERT) motivated time-dependent probabilities, conditioned on the date of last earthquake, for the segmented type-A fault models of the 2007 Working Group on California Earthquake Probabilities (WGCEP). These probabilities are included as one option in the WGCEP?s Uniform California Earthquake Rupture Forecast 2 (UCERF 2), with the other options being time-independent Poisson probabilities and an ?Empirical? model based on observed seismicity rate changes. A more general discussion of the pros and cons of all methods for computing time-dependent probabilities, as well as the justification of those chosen for UCERF 2, are given in the main body of this report (and the 'Empirical' model is also discussed in Appendix M). What this appendix addresses is the computation of conditional, time-dependent probabilities when both single- and multi-segment ruptures are included in the model. Computing conditional probabilities is relatively straightforward when a fault is assumed to obey strict segmentation in the sense that no multi-segment ruptures occur (e.g., WGCEP (1988, 1990) or see Field (2007) for a review of all previous WGCEPs; from here we assume basic familiarity with conditional probability calculations). However, and as we?ll see below, the calculation is not straightforward when multi-segment ruptures are included, in essence because we are attempting to apply a point-process model to a non point process. The next section gives a review and evaluation of the single- and multi-segment rupture probability-calculation methods used in the most recent statewide forecast for California (WGCEP UCERF 1; Petersen et al., 2007). We then present results for the methodology adopted here for UCERF 2. We finish with a discussion of issues and possible alternative approaches that could be explored and perhaps applied in the future. A fault-by-fault comparison of UCERF 2 probabilities with those of previous studies is given in the main part of this report.

  17. 32 CFR Appendix D to Part 1290 - Ticket Sample-A Nontraffic Violation

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Ticket Sample-A Nontraffic Violation D Appendix D to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S...

  18. 7 CFR Appendix A to Part 3434 - List of Agriculture-Related Fields

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false List of Agriculture-Related Fields A Appendix A to Part 3434 Agriculture Regulations of the Department of Agriculture (Continued) NATIONAL INSTITUTE OF FOOD AND AGRICULTURE HISPANIC-SERVING AGRICULTURAL COLLEGES AND UNIVERSITIES CERTIFICATION PROCESS Pt...

  19. 12 CFR Appendix A to Part 233 - Model Notice

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING (REGULATION GG) Pt. 233, App. A Appendix A to Part 233... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  20. 12 CFR Appendix A to Part 233 - Model Notice

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING (REGULATION GG) Pt. 233, App. A Appendix A to Part 233... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  1. 12 CFR Appendix A to Part 233 - Model Notice

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING (REGULATION GG) Pt. 233, App. A Appendix A to Part 233... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  2. 48 CFR Appendix A to Part 1219 - Appendix A to Part 1219

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Rebuilding of engines, turbines, components and weapons equipment J028/J010 (5) ADP Central Processing Units... Engines, Aircraft; and Components 2840 (10) Radar Equipment (except airborne) and Navigation and Navigational Aids (basic research) 5840/AT31 * The industry categories were derived from Federal Procurement...

  3. 48 CFR Appendix A to Part 1219 - Appendix A to Part 1219

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Rebuilding of engines, turbines, components and weapons equipment J028/J010 (5) ADP Central Processing Units... Engines, Aircraft; and Components 2840 (10) Radar Equipment (except airborne) and Navigation and Navigational Aids (basic research) 5840/AT31 * The industry categories were derived from Federal Procurement...

  4. 48 CFR Appendix A to Part 1219 - Appendix A to Part 1219

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Rebuilding of engines, turbines, components and weapons equipment J028/J010 (5) ADP Central Processing Units... Engines, Aircraft; and Components 2840 (10) Radar Equipment (except airborne) and Navigation and Navigational Aids (basic research) 5840/AT31 * The industry categories were derived from Federal Procurement...

  5. 48 CFR Appendix A to Part 1219 - Appendix A to Part 1219

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Rebuilding of engines, turbines, components and weapons equipment J028/J010 (5) ADP Central Processing Units... Engines, Aircraft; and Components 2840 (10) Radar Equipment (except airborne) and Navigation and Navigational Aids (basic research) 5840/AT31 * The industry categories were derived from Federal Procurement...

  6. 32 CFR Appendix D to Part 323 - Word Processing Center (WPC) Safeguards

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DEFENSE (CONTINUED) PRIVACY PROGRAM DEFENSE LOGISTICS AGENCY PRIVACY PROGRAM Pt. 323, App. D Appendix D to.... 2. Storing media containing personal data in separate files or areas. 3. Marking the storage... the areas discussed in this enclosure, as well as any special risks that the WPC location...

  7. 32 CFR Appendix D to Part 323 - Word Processing Center (WPC) Safeguards

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DEFENSE (CONTINUED) PRIVACY PROGRAM DEFENSE LOGISTICS AGENCY PRIVACY PROGRAM Pt. 323, App. D Appendix D to.... 2. Storing media containing personal data in separate files or areas. 3. Marking the storage... the areas discussed in this enclosure, as well as any special risks that the WPC location...

  8. 32 CFR Appendix D to Part 323 - Word Processing Center (WPC) Safeguards

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... DEFENSE (CONTINUED) PRIVACY PROGRAM DEFENSE LOGISTICS AGENCY PRIVACY PROGRAM Pt. 323, App. D Appendix D to.... 2. Storing media containing personal data in separate files or areas. 3. Marking the storage... the areas discussed in this enclosure, as well as any special risks that the WPC location...

  9. 32 CFR Appendix D to Part 1290 - Ticket Sample-A Nontraffic Violation

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Ticket Sample-A Nontraffic Violation D Appendix D to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S...

  10. 32 CFR Appendix D to Part 1290 - Ticket Sample-A Nontraffic Violation

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Ticket Sample-A Nontraffic Violation D Appendix D to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S...

  11. 32 CFR Appendix D to Part 1290 - Ticket Sample-A Nontraffic Violation

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Ticket Sample-A Nontraffic Violation D Appendix D to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S...

  12. 32 CFR Appendix D to Part 1290 - Ticket Sample-A Nontraffic Violation

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Ticket Sample-A Nontraffic Violation D Appendix D to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S...

  13. 12 CFR Appendix A to Part 233 - Model Notice

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... FUNDING OF UNLAWFUL INTERNET GAMBLING (REGULATION GG) Part 233, App. A Appendix A to Part 233—Model Notice [Date] [Name of foreign sender or foreign banking office] [Address] Re: U.S. Unlawful Internet Gambling... that your institution processed payments through our facilities for Internet gambling transactions...

  14. 12 CFR Appendix A to Part 233 - Model Notice

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... FUNDING OF UNLAWFUL INTERNET GAMBLING (REGULATION GG) Part 233, App. A Appendix A to Part 233—Model Notice [Date] [Name of foreign sender or foreign banking office] [Address] Re: U.S. Unlawful Internet Gambling... that your institution processed payments through our facilities for Internet gambling transactions...

  15. 40 CFR Appendix to Part 240 - Recommended Bibliography

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Part 240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Pt. 240, App. Appendix to Part 240—Recommended Bibliography 1. The Solid Waste Disposal Act as amended; Title II of Pub. L. 89-272, 89th Cong., S. 306, Oct. 20...

  16. 48 CFR Appendix A to Part 1219 - Appendix A to Part 1219

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...* FPDS products and service code (1) Engineering Development AT94 (2) Systems Engineering Services (Only) R414 (3) Radio/TV Communication Equipment (except airborne) 5820 (4) Maintenance, Repair, and Rebuilding of engines, turbines, components and weapons equipment J028/J010 (5) ADP Central Processing Units...

  17. In Situ/On-Site Biodegradation of Refined Oils and Fuels (A Technology Review). Volume 3. Appendices B to F.

    DTIC Science & Technology

    1992-06-01

    streams (Oxitron system). The system combines the features of activated sludge and fixed-film biological processes (see Appendix F, Biotechnologies...contaminated aqueous streams. The system combines the features of activated sludge and fixed-film biological processes (see Appendix F, Biotechnologies in... marine oil spills have been estimated to average $6.50/gal of spilled oil (Bartha and Atlas, 1977). This translates to roughly $2000 per metric ton

  18. High-pT Physics in the Heavy Ion Era

    NASA Astrophysics Data System (ADS)

    Rak, Jan; Tannenbaum, Michael J.

    2013-04-01

    1. Introduction and overview; 2. Basic observables; 3. Some experimental techniques; 4. The search for structure; 5. Origins of high pT physics - the search for the W boson; 6. Discovery of hard scattering in p-p collisions; 7. Direct single lepton production and the discovery of charm; 8. J/ ψ, u and Drell-Yan pair production; 9. Two particle correlations; 10. Direct photon production; 11. The search for jets; 12. QCD in hard scattering; 13. Heavy ion physics in the high pT era; 14. RHIC and LHC; Appendix A. Probability and statistics; Appendix B. Methods of Monte Carlo calculations; Appendix C. TAB and the Glauber Monte Carlo calculation; Appendix D. Fits including systematic errors; Appendix E. The shape of the xE distribution triggered by a jet fragment, for example, π0; Appendix F. kT phenomenology and Gaussian smearing; References; Index.

  19. Morphological variations of the vermiform appendix in Iranian cadavers: a study from developing countries.

    PubMed

    Mohammadi, Shabnam; Hedjazi, Arya; Sajjadian, Maryam; Rahmani, Mahboobeh; Mohammadi, Maryam; Moghadam, Maliheh Dadgar

    2017-03-29

    The vermiform appendix is a worm like tube containing a large amount of lymphoid follicles. In our knowledge, there is a little standard data about the vermiform appendix in Iranian population. Therefore, the objective of this study was to investigate the normal appendix size in Iranian cadavers. A cross-sectional study was undertaken between June 2014 and July 2015, in the autopsy laboratory, Legal Medicine Organization, Razavi Khorasan province, Iran. A total of 693 cadavers with the mean age of 40.46±20.99 years were divided into 10 groups. After writing down position of the appendix, the length, diameter and weight of appendix were measured. Statistical analysis was performed using SPSS software. The mean values of the demographic characteristics included: age= 40.46 ± 20.99 years; weight = 63.47 ± 17.84 kg; height = 159.95 ± 28.23 cm. The mean values of the appendix length, diameter, weight and index in the cadavers were 8.52 ± 2.99 cm, 12.17 ± 4.53 mm, 6.43 ± 3.26 grams and 0.013 ± 0.01, respectively. The most common position of appendix was retrocecal in 71.7% of cases. A significant correlations were evident between the value of demographic data and appendix size (P<0.05). The diameter (P=0.002) and index of appendix (P=0.003) showed significant difference between males and females. Having standard data on the vermiform appendix is useful for clinicians as well as anthropologists. The findings of the present study can provide information about morphologic variations of the appendix in Iranian population.

  20. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.; Lantow, Tiffany A.

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.« less

  1. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  2. Mucinous cystadenoma of the appendix presenting as an umbilical hernia: A case report.

    PubMed

    Ren, Bingbing; Meng, Xiangchao; Cao, Z I; Guo, Chunli; Zhang, Zili

    2016-06-01

    Mucinous cystadenoma of the appendix is a rare condition that develops as a result of proliferation of mucin-secreting cells in an occluded appendix. Mucinous cystadenoma of the appendix presenting as an umbilical hernia is a rare clinical entity. The most common causes of this condition are known to be ascites, hepatitis and cirrhosis; however, the patient in the present study, was diagnosed as hepatitis- and cirrhosis-negative, with no history of chronic coughing or constipation. The aim of the present study was to report a rare case of mucinous cystadenoma of the appendix presenting as an umbilical hernia in a 66-year-old female patient. The patient had a 6-month history of a reducible mass in the umbilical region and was diagnosed with umbilical hernia. Computed tomography and ultrasonography were performed and revealed massive ascites. Ultimately, a laparoscopic appendectomy was performed and borderline mucinous appendiceal cystadenoma of low malignant potential was confirmed. In addition, the present study discussed the association between mucinous cystadenoma of the appendix and umbilical hernia, as well as the diagnostic process and treatment strategies.

  3. Mucinous cystadenoma of the appendix presenting as an umbilical hernia: A case report

    PubMed Central

    REN, BINGBING; MENG, XIANGCHAO; CAO, ZI; GUO, CHUNLI; ZHANG, ZILI

    2016-01-01

    Mucinous cystadenoma of the appendix is a rare condition that develops as a result of proliferation of mucin-secreting cells in an occluded appendix. Mucinous cystadenoma of the appendix presenting as an umbilical hernia is a rare clinical entity. The most common causes of this condition are known to be ascites, hepatitis and cirrhosis; however, the patient in the present study, was diagnosed as hepatitis- and cirrhosis-negative, with no history of chronic coughing or constipation. The aim of the present study was to report a rare case of mucinous cystadenoma of the appendix presenting as an umbilical hernia in a 66-year-old female patient. The patient had a 6-month history of a reducible mass in the umbilical region and was diagnosed with umbilical hernia. Computed tomography and ultrasonography were performed and revealed massive ascites. Ultimately, a laparoscopic appendectomy was performed and borderline mucinous appendiceal cystadenoma of low malignant potential was confirmed. In addition, the present study discussed the association between mucinous cystadenoma of the appendix and umbilical hernia, as well as the diagnostic process and treatment strategies. PMID:27313766

  4. Large-format high resolution microchannel plate detectors for ultraviolet astronomy

    NASA Technical Reports Server (NTRS)

    Martin, Christopher

    1995-01-01

    This report includes work on two types of two-dimensional position-sensitive detectors that were developed in this lab under this award. We worked to develop and optimize the wire-wound helical delay line detector (HDL) in the first and second years. Some early work on the HDL is contained in a paper included as Appendix A. In the second and third years we developed the concept for, then successfully designed and tested, both a lab prototype, and a flight prototype of the first, crossed delay line detector based on two orthogonal serpentine delay lines (SDL). Some of the work on the SDL is contained in a paper included as Appendix B. Appendix C contains copies of the invention report and record.

  5. Radar target classification studies: Software development and documentation

    NASA Astrophysics Data System (ADS)

    Kamis, A.; Garber, F.; Walton, E.

    1985-09-01

    Three computer programs were developed to process and analyze calibrated radar returns. The first program, called DATABASE, was developed to create and manage a random accessed data base. The second program, called FTRAN DB, was developed to process horizontal and vertical polarizations radar returns into different formats (i.e., time domain, circular polarizations and polarization parameters). The third program, called RSSE, was developed to simulate a variety of radar systems and to evaluate their ability to identify radar returns. Complete computer listings are included in the appendix volumes.

  6. MHD Modeling of the Interaction of the Solar Wind With Venus

    NASA Technical Reports Server (NTRS)

    Steinolfson, R. S.

    1996-01-01

    The primary objective of this research program is to improve our understanding of the physical processes occurring in the interaction of the solar wind with Venus. This will be accomplished through the use of numerical solutions of the two- and three-dimensional magnetohydrodynamic (MHD) equations and through comparisons of the computed results with available observations. A large portion of this effort involves the study of processes due to the presence of the magnetic field and the effects of mass loading. Published papers are included in the appendix.

  7. Identification of energy conservation research opportunities: a review and synthesis of the literature

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hopp, W.J.; Hane, G.J.; Gurwell, W.E.

    1982-03-01

    Thirty-eight studies of energy conservation research opportunities are reviewed. The 38 studies chosen for review include many of the major efforts in the identification of energy conservation research and development (R and D) opportunities and provide a representative sample of the types of studies that have been performed. The sample includes studies that focus on specific energy use (e.g., auto transport), as well as studies that focus on specific types of research (e.g., materials science). The sample also includes studies that can be further contrasted in terms of long-term vs. short-term projects, evolutionary vs. revolutionary ideas, generic vs. process-specific activities,more » and technology base research vs. hardware development. Each of these perspectives contributes toward assuring coverage of the breadth of energy conservation R and D opportunities. In each review the technical or end-use focus is described, the research ideas identified in the study are listed, and a critical summary is given. The reviews also indicate whether the studies present end-use consumption data, estimate potential energy savings, estimate times to commercialization, summarize existing research programs, or describe the identification methodology. In Section 2.0 the various research studies are compared. In Section 3.0 the characteristics of an aggregate list of research ideas are discussed. The characteristics were collected from the research opportunities studies, which are included in Appendix A. Appendix A contains a compilation of energy conservation R and D opportunities arranged by energy end-use applications. Appendix B contains an outline of the format followed in writing the critical reviews of the studies, the individual study reviews, and the extended bibliography of 88 studies that describe energy conservation research opportunities.« less

  8. Environmental Assessment for A-29 Light Air Support (LAS) Training Beddown

    DTIC Science & Technology

    2014-08-21

    Nation. Appendix A Updated to include responses/letters from federal and local agencies. Page 1 of 1 FINDING OF NO SIGNIFICANT IMPACT A-29...32 CFR §989, Environmental Impact Analysis Process, the U.S. Air Force (Air Force) assessed the potential environmental consequences associated with...protection measures to avoid or reduce adverse environmental impacts . The EA considers all potential impacts of basing this training unit at three

  9. Use of Severity of Illness Indexes for Assessing Health Care Provider Performance

    DTIC Science & Technology

    1985-07-01

    Exclusive reliance on manual selection of the inpatient records would have proven difficult and time consuming. Appendix B contains correspondence...presence of mortalities or complications following surgery. Results obtained from the two-fold PASBA screen and manual selection process represent a...information provided include the last four numbers of each patient’s social security number, register number, procedure and occurrence found. A manual

  10. ’Huts and Nuts’ or ’Hearts and Minds?’ -- Anthropologists and Operational Art

    DTIC Science & Technology

    2008-12-06

    hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and...does operational art provide anthropology? A historical look at the use of anthropologists and their data /analysis is featured in Appendix A. Its...or undermine their efforts. Anthropologists, by introducing and using their fieldwork process of mapping out and data -basing these cultural and

  11. Underbody Blast Models of TBI Caused by Hyper-Acceleration and Secondary Head Impact

    DTIC Science & Technology

    2014-02-01

    Cleveland RO, Tanzi RE, Stanton PK, McKee AC. (2012) Chronic traumatic encephalopathy in blast-exposed military veterans and a blast neurotrauma mouse model...exposure, remove brains, and process for electron microscopic analysis of cyto- and axonal ultrastructure and for histochemical evidence of acute ...of Trauma and Acute Care Surgery (see Appendix). These observations include increased axonopathy (silver staining) in the cerebellum and astrocyte

  12. Process Approach to Determining Quality Inspection Deployment

    DTIC Science & Technology

    2015-06-08

    27 B.1 The Deming Rule...inspection is effective. The Deming rule is explained in more detail in Appendix B. Basically the probability of error is compared to the cost of...cost or risk to repair defects escaped from inspection justify reducing inspectors. (See Appendix B for Deming rule discussion.) Three quantities must

  13. Strategic Mobility 21 Initial Capabilities Document (ICD)

    DTIC Science & Technology

    2006-07-28

    MANDATORY ARCHITECTURE FRAMWORK DOCUMENT .......................................A-1 APPENDIX B: REFERENCES...Document July 27, 2006 JPPSP ICD Version 1.0 A-1 APPENDIX A: MANDATORY ARCHITECTURE FRAMWORK DOCUMENT Legend next page. Initial Capabilities...SM21 will combine several end-to-end Force Projection Process enablers. Some of the enablers described below are at the conceptual stage while others

  14. 32 CFR Appendix B to Part 1290 - Ticket Sample-A Parking Violation

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Ticket Sample-A Parking Violation B Appendix B to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S. DISTRICT COURTS Pt...

  15. 32 CFR Appendix C to Part 1290 - Ticket Sample-A Moving Violation

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Ticket Sample-A Moving Violation C Appendix C to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S. DISTRICT COURTS Pt...

  16. State Compensatory Education. Final Technical Report 1975-76. Appendixes.

    ERIC Educational Resources Information Center

    Austin Independent School District, TX. Office of Research and Evaluation.

    This material consists of ten appendixes to the Final Report for 1976-77 on the implementation of the Texas state-supported compensatory education program in the Austin Independent School District as evaluated by that district's Office of Research and Evaluation. The instruments used in the evaluation process are described or presented in full,…

  17. A CMOS VLSI IC for Real-Time Opto-Electronic Two-Dimensional Histogram Generation

    DTIC Science & Technology

    1993-12-01

    large scale integration) design; MAGIC ; CMOS; optics; image processing; 93 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY CLASSIFICATiON 19...1. Sun SPARCstation ............. .............. 6 2. Magic .................. ................... 6 a. Peg ................. .................. 7 b...38 v APPENDIX B. MAGIC CELL LAYOUTS .... ............ .. 39 APPENDIX C: SIMULATION DATA ....... ............. .. 56 A. FINITE STATE MACHINE

  18. 17 CFR Appendix B to Part 36 - Guidance on, and Acceptable Practices in, Compliance With Core Principles

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... COMMODITY FUTURES TRADING COMMISSION EXEMPT MARKETS Pt. 36, App. B Appendix B to Part 36—Guidance on, and... contracts to prevent market manipulation, price distortion, and disruptions of the delivery of cash-settlement process through market surveillance, compliance and disciplinary practices and procedures...

  19. 17 CFR Appendix B to Part 36 - Guidance on, and Acceptable Practices in, Compliance With Core Principles

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... COMMODITY FUTURES TRADING COMMISSION EXEMPT MARKETS Pt. 36, App. B Appendix B to Part 36—Guidance on, and... contracts to prevent market manipulation, price distortion, and disruptions of the delivery of cash-settlement process through market surveillance, compliance and disciplinary practices and procedures...

  20. 32 CFR Appendix B to Part 1290 - Ticket Sample-A Parking Violation

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Ticket Sample-A Parking Violation B Appendix B to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S. DISTRICT COURTS Pt...

  1. 32 CFR Appendix C to Part 1290 - Ticket Sample-A Moving Violation

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Ticket Sample-A Moving Violation C Appendix C to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S. DISTRICT COURTS Pt...

  2. 32 CFR Appendix B to Part 1290 - Ticket Sample-A Parking Violation

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Ticket Sample-A Parking Violation B Appendix B to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S. DISTRICT COURTS Pt...

  3. 32 CFR Appendix B to Part 1290 - Ticket Sample-A Parking Violation

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Ticket Sample-A Parking Violation B Appendix B to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S. DISTRICT COURTS Pt...

  4. 32 CFR Appendix C to Part 1290 - Ticket Sample-A Moving Violation

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Ticket Sample-A Moving Violation C Appendix C to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S. DISTRICT COURTS Pt...

  5. 32 CFR Appendix B to Part 1290 - Ticket Sample-A Parking Violation

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Ticket Sample-A Parking Violation B Appendix B to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S. DISTRICT COURTS Pt...

  6. 14 CFR Appendix B to Part 150 - Noise Compatibility Programs

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...

  7. 14 CFR Appendix B to Part 150 - Noise Compatibility Programs

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...

  8. 14 CFR Appendix B to Part 150 - Noise Compatibility Programs

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...

  9. 14 CFR Appendix B to Part 150 - Noise Compatibility Programs

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...

  10. 14 CFR Appendix B to Part 150 - Noise Compatibility Programs

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...

  11. Introduction to Econophysics

    NASA Astrophysics Data System (ADS)

    Mantegna, Rosario N.; Stanley, H. Eugene

    2007-08-01

    Preface; 1. Introduction; 2. Efficient market hypothesis; 3. Random walk; 4. Lévy stochastic processes and limit theorems; 5. Scales in financial data; 6. Stationarity and time correlation; 7. Time correlation in financial time series; 8. Stochastic models of price dynamics; 9. Scaling and its breakdown; 10. ARCH and GARCH processes; 11. Financial markets and turbulence; 12. Correlation and anti-correlation between stocks; 13. Taxonomy of a stock portfolio; 14. Options in idealized markets; 15. Options in real markets; Appendix A: notation guide; Appendix B: martingales; References; Index.

  12. Columbia Accident Investigation Board. Volume 4

    NASA Technical Reports Server (NTRS)

    White, Donald J. (Editor); Goodman, Patrick A. (Editor); Reingold, Lester A. (Editor); Kirchhoff, Christopher M. (Editor); Simon, Ariel H. (Editor)

    2003-01-01

    The CAIB requested these data be included in this Appendix. This Appendix is a summary of present and past efforts that were initiated to characterize the moisture absorption capability of sprayed-on-foam-insulation (SOFI) and specifically, BX-250.

  13. Methodologies for optimal resource allocation to the national space program and new space utilizations. Volume 2: Resource allocation and smoothing model, programmer's manual

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Appendixes are presented that provide model input requirements, a sample case, flow charts, and a program listing. At the beginning of each appendix, descriptive details and technical comments are provided to indicate any special instructions applicable to the use of that appendix. In addition, the program listing includes comment cards that state the purpose of each subroutine in the complete program and describe operations performed within that subroutine. The input requirements includes details on the many options that adapt the program to the specific needs of the analyst for a particular problem.

  14. Big River Reservoir Project - Pawcatuck River and Narragansett Bay Drainage Basins - Water and Related Land Resources Study. Volume III. Appendices H-K.

    DTIC Science & Technology

    1981-07-01

    including a recreation impact analysis, aquatic and terrestrial ecosystems assessment and a fish and wildlife management plan), social and cultural...APPENDIX G - DESIGN AND COST ESTIMATES VOLUME III - APPENDIX H - RECREATION AND NATURAL RESOURCES Section 1 - Recreation Impact Analysis Section 2 - Aquatic... Ecosystem Assessment Section 3 - Terrestrial Ecosystem Assessment Section 4 - Fish and Wildlife Management Plan APPENDIX I - SOCIAL AND CULTURAL

  15. Powder Metallurgy of Uranium Alloy Fuels for TRU-Burning Reactors Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDeavitt, Sean M

    2011-04-29

    Overview Fast reactors were evaluated to enable the transmutation of transuranic isotopes generated by nuclear energy systems. The motivation for this was that TRU isotopes have high radiotoxicity and relatively long half-lives, making them unattractive for disposal in a long-term geologic repository. Fast reactors provide an efficient means to utilize the energy content of the TRUs while destroying them. An enabling technology that requires research and development is the fabrication metallic fuel containing TRU isotopes using powder metallurgy methods. This project focused upon developing a powder metallurgical fabrication method to produce U-Zr-transuranic (TRU) alloys at relatively low processing temperatures (500ºCmore » to 600ºC) using either hot extrusion or alpha-phase sintering for charecterization. Researchers quantified the fundamental aspects of both processing methods using surrogate metals to simulate the TRU elements. The process produced novel solutions to some of the issues relating to metallic fuels, such as fuel-cladding chemical interactions, fuel swelling, volatility losses during casting, and casting mold material losses. Workscope There were two primary tasks associated with this project: 1. Hot working fabrication using mechanical alloying and extrusion • Design, fabricate, and assemble extrusion equipment • Extrusion database on DU metal • Extrusion database on U-10Zr alloys • Extrusion database on U-20xx-10Zr alloys • Evaluation and testing of tube sheath metals 2. Low-temperature sintering of U alloys • Design, fabricate, and assemble equipment • Sintering database on DU metal • Sintering database on U-10Zr alloys • Liquid assisted phase sintering on U-20xx-10Zr alloys Appendices Outline Appendix A contains a Fuel Cycle Research & Development (FCR&D) poster and contact presentation where TAMU made primary contributions. Appendix B contains MSNE theses and final defense presentations by David Garnetti and Grant Helmreich outlining the beginning of the materials processing setup. Also included within this section is a thesis proposal by Jeff Hausaman. Appendix C contains the public papers and presentations introduced at the 2010 American Nuclear Society Winter Meeting. Appendix A—MSNE theses of David Garnetti and Grant Helmreich and proposal by Jeff Hausaman A.1 December 2009 Thesis by David Garnetti entitled “Uranium Powder Production Via Hydride Formation and Alpha Phase Sintering of Uranium and Uranium-Zirconium Alloys for Advanced Nuclear Fuel Applications” A.2 September 2009 Presentation by David Garnetti (same title as document in Appendix B.1) A.3 December 2010 Thesis by Grant Helmreich entitled “Characterization of Alpha-Phase Sintering of Uranium and Uranium-Zirconium Alloys for Advanced Nuclear Fuel Applications” A.4 October 2010 Presentation by Grant Helmreich (same title as document in Appendix B.3) A.5 Thesis Proposal by Jeffrey Hausaman entitled “Hot Extrusion of Alpha Phase Uranium-Zirconium Alloys for TRU Burning Fast Reactors” Appendix B—External presentations introduced at the 2010 ANS Winter Meeting B.1 J.S. Hausaman, D.J. Garnetti, and S.M. McDeavitt, “Powder Metallurgy of Alpha Phase Uranium Alloys for TRU Burning Fast Reactors,” Proceedings of 2010 ANS Winter Meeting, Las Vegas, Nevada, USA, November 7-10, 2010 B.2 PowerPoint Presentation Slides from C.1 B.3 G.W. Helmreich, W.J. Sames, D.J. Garnetti, and S.M. McDeavitt, “Uranium Powder Production Using a Hydride-Dehydride Process,” Proceedings of 2010 ANS Winter Meeting, Las Vegas, Nevada, USA, November 7-10, 2010 B.4. PowerPoint Presentation Slides from C.3 B.5 Poster Presentation from C.3 Appendix C—Fuel cycle research and development undergraduate materials and poster presentation C.1 Poster entitled “Characterization of Alpha-Phase Sintering of Uranium and Uranium-Zirconium Alloys” presented at the Fuel Cycle Technologies Program Annual Meeting C.2 April 2011 Honors Undergraduate Thesis by William Sames, Research Fellow, entitled “Uranium Metal Powder Production, Particle Distribution Analysis, and Reaction Rate Studies of a Hydride-Dehydride Process"« less

  16. 33 CFR Appendix B to Part 273 - Information Requirements for Aquatic Plant Control Program Reports

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE AQUATIC PLANT CONTROL Pt. 273, App. B Appendix B to... source of reinfestation; extent of infestation including estimated surface area, depth or density; nature...

  17. 33 CFR Appendix B to Part 273 - Information Requirements for Aquatic Plant Control Program Reports

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE AQUATIC PLANT CONTROL Pt. 273, App. B Appendix B to... source of reinfestation; extent of infestation including estimated surface area, depth or density; nature...

  18. Space transfer vehicle concepts and requirements. Volume 2, book 2: Appendix

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This appendix describes the work that was performed to define the Lunar transfer vehicle and Lunar excursion vehicle which were part of the 'Report of the 90-Day Study on Human Exploration of the Moon and Mars.' A detailed concept definition of both vehicles including overall dimensions, mass properties, subsystem definition, and operational flight sequences is included.

  19. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.

    2014-03-03

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence withmore » the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.« less

  20. Mineral commodity summaries 2013

    USGS Publications Warehouse

    ,

    2013-01-01

    Each chapter of the 2013 edition of the U.S. Geological Survey (USGS) Mineral Commodity Summaries (MCS) includes information on events, trends, and issues for each mineral commodity as well as discussions and tabular presentations on domestic industry structure, Government programs, tariffs, 5-year salient statistics, and world production and resources. The MCS is the earliest comprehensive source of 2012 mineral production data for the world. More than 90 individual minerals and materials are covered by two-page synopses. For mineral commodities for which there is a Government stockpile, detailed information concerning the stockpile status is included in the two-page synopsis. Abbreviations and units of measure, and definitions of selected terms used in the report, are in Appendix A and Appendix B, respectively. “Appendix C—Reserves and Resources” includes “Part A—Resource/Reserve Classification for Minerals” and “Part B—Sources of Reserves Data.” A directory of USGS minerals information country specialists and their responsibilities is Appendix D. The USGS continually strives to improve the value of its publications to users. Constructive comments and suggestions by readers of the MCS 2013 are welcomed.

  1. Mineral commodity summaries 2014

    USGS Publications Warehouse

    ,

    2014-01-01

    Each chapter of the 2014 edition of the U.S. Geological Survey (USGS) Mineral Commodity Summaries (MCS) includes information on events, trends, and issues for each mineral commodity as well as discussions and tabular presentations on domestic industry structure, Government programs, tariffs, 5-year salient statistics, and world production and resources. The MCS is the earliest comprehensive source of 2013 mineral production data for the world. More than 90 individual minerals and materials are covered by two-page synopses. For mineral commodities for which there is a Government stockpile, detailed information concerning the stockpile status is included in the two-page synopsis. Abbreviations and units of measure, and definitions of selected terms used in the report, are in Appendix A and Appendix B, respectively. “Appendix C—Reserves and Resources” includes “Part A—Resource/Reserve Classification for Minerals” and “Part B—Sources of Reserves Data.” A directory of USGS minerals information country specialists and their responsibilities is Appendix D. The USGS continually strives to improve the value of its publications to users. Constructive comments and suggestions by readers of the MCS 2014 are welcomed.

  2. 32 CFR Appendix A to Part 1290 - Preparation Guide for DD Form 1805, Violation Notice

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Preparation Guide for DD Form 1805, Violation Notice A Appendix A to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S...

  3. 7 CFR 6.37 - Supersedure of Import Regulation 1, Revision 7.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...,064 13,064 SWISS OR EMMENTHALER CHEESE OTHER THAN WITH EYE FORMATION, GRUYERE-PROCESS CHEESE AND... ofAppendix 1&2 Appendix 3 Tokyo R. Uruguay R. Harmonized tariff schedule NON-CHEESE ARTICLES BUTTER...: NON-CHEESE ARTICLES 4,737,167 17,127,614 21,864,781 21,864,781 CHEESE ARTICLES CHEESE AND SUBSTITUTES...

  4. 12 CFR Appendix E to Part 208 - Capital Adequacy Guidelines for State Member Banks; Market Risk Measure

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... A bank subject to this appendix must have a risk management system that meets the following minimum... management and is independent from business trading units. (2) The bank's internal risk measurement model must be integrated into the daily management process. (3) The bank's policies and procedures must...

  5. 32 CFR Appendix A to Part 1290 - Preparation Guide for DD Form 1805, Violation Notice

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Preparation Guide for DD Form 1805, Violation Notice A Appendix A to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S...

  6. 32 CFR Appendix A to Part 1290 - Preparation Guide for DD Form 1805, Violation Notice

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Preparation Guide for DD Form 1805, Violation Notice A Appendix A to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S...

  7. 32 CFR Appendix A to Part 1290 - Preparation Guide for DD Form 1805, Violation Notice

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Preparation Guide for DD Form 1805, Violation Notice A Appendix A to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE LOGISTICS AGENCY MISCELLANEOUS PREPARING AND PROCESSING MINOR OFFENSES AND VIOLATION NOTICES REFERRED TO U.S...

  8. 10 CFR Appendix H to Part 110 - Illustrative List of Electromagnetic Enrichment Plant Equipment and Components Under NRC Export...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Illustrative List of Electromagnetic Enrichment Plant... Appendix H to Part 110—Illustrative List of Electromagnetic Enrichment Plant Equipment and Components Under NRC Export Licensing Authority Note—In the electromagnetic process, uranium metal ions produced by...

  9. 10 CFR Appendix H to Part 110 - Illustrative List of Electromagnetic Enrichment Plant Equipment and Components Under NRC Export...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Illustrative List of Electromagnetic Enrichment Plant... Appendix H to Part 110—Illustrative List of Electromagnetic Enrichment Plant Equipment and Components Under NRC Export Licensing Authority Note—In the electromagnetic process, uranium metal ions produced by...

  10. 10 CFR Appendix H to Part 110 - Illustrative List of Electromagnetic Enrichment Plant Equipment and Components Under NRC Export...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Illustrative List of Electromagnetic Enrichment Plant... Appendix H to Part 110—Illustrative List of Electromagnetic Enrichment Plant Equipment and Components Under NRC Export Licensing Authority Note—In the electromagnetic process, uranium metal ions produced by...

  11. 10 CFR Appendix H to Part 110 - Illustrative List of Electromagnetic Enrichment Plant Equipment and Components Under NRC Export...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Illustrative List of Electromagnetic Enrichment Plant... Appendix H to Part 110—Illustrative List of Electromagnetic Enrichment Plant Equipment and Components Under NRC Export Licensing Authority Note—In the electromagnetic process, uranium metal ions produced by...

  12. 10 CFR Appendix H to Part 110 - Illustrative List of Electromagnetic Enrichment Plant Equipment and Components Under NRC Export...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Illustrative List of Electromagnetic Enrichment Plant... Appendix H to Part 110—Illustrative List of Electromagnetic Enrichment Plant Equipment and Components Under NRC Export Licensing Authority Note: In the electromagnetic process, uranium metal ions produced by...

  13. 12 CFR Appendix A to Subpart H of... - Consumer Grievance Process

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Subpart H of Part 208 Banks and Banking FEDERAL RESERVE SYSTEM BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM MEMBERSHIP OF STATE BANKING INSTITUTIONS IN THE FEDERAL RESERVE SYSTEM (REGULATION H) Consumer Protection in Sales of Insurance Pt. 208, Subpt. H, App. A Appendix A to Subpart H of Part 208—Consumer...

  14. Microelectrode Geochemcial Observatory for In Situ Monitoring of Metals Concentration and Mobility in Contaminated Sediments

    DTIC Science & Technology

    2013-09-01

    ABSTRACT 18. NUMBER OF PAGES 19a. NAME OF RESPONSIBLE PERSON a. REPORT b. ABSTRACT c . THIS PAGE 19b. TELEPHONE NUMBER (include area code) Standard Form 298...Monitoring of Metals Concentration and Mobility in Contaminated Sediments N62583-11- C -0524 NAVFAC EXWC - Nancy Ruiz, Ph.D. Geosyntec Consultants...OF APPENDICES APPENDIX A: Representative Poor Electrochemical Scans APPENDIX B: Standard Solution Test Data APPENDIX C : Bremerton Porewater Test

  15. Evaluation of Diesel Engine Performance with Intake and Exhaust System Throttling : Volume 2. Appendix 1.

    DOT National Transportation Integrated Search

    1975-11-01

    The appendix to the preceding volume presents the data for the subject diesel engine noise study, including an engine sound power level analysis and sound spectrums showing the effect of intake and exhaust restrictions.

  16. Wastewater Management Alternatives for the Cleveland - Akron, Three Rivers Watershed Area. Technical Appendix - Phase II. System Design and Estimate of Cost.

    DTIC Science & Technology

    1973-02-01

    established. Secondly, the applicable process sequence to most economically meet these requirements under local enviromental constraints must be...concentrations are highest for receiving waters containing cold water fisheries. Allowable fecal coliform bacteria counts vary seasonally and dictate...handling system has also been modified to include gravity waste activated sludge thickening and heat conditioning of the combined raw sludge after

  17. Management of Endurance Risk Factors: A Guide for Deep Draft Vessels

    DTIC Science & Technology

    2001-02-01

    Poor diet (frequent fried foods, high fat and sugar content, frequent caffeine consumption) • High workload (high physical and/or mental effort...Appendix A) q 8. Poor diet (menu includes frequent fried foods, high fat and sugar content, frequent caffeine consumption; see Section II-4, and II...into glucose (or sugar ), amino acids, and fatty acids. Cells throughout the body then process these compounds to make energy or ATP

  18. Echolocation-Based Foraging by Harbor Porpoises and Sperm Whales, Including Effects on Noise and Acoustic Propagation

    DTIC Science & Technology

    2008-09-01

    Behavioural Point Process Data 234 Appendix B: Matlab Code 258 Matlab Code Used in Chapter 2 (Porpoise Prey Capture Analysis) 258 Click Extraction and...Measurement of Click Properties 258 Envelope-based Click Detector 262 Matlab Code Used in Chapter 3 (Transmission Loss in Porpoise Habitats) ..267...Click Extraction from Data Wavefiles 267 Click Level Determination (Grand Manan Datasets) 270 Click Level Determination (Danish Datasets) 287 Matlab

  19. Investigation of Mechanical Breakdowns Leading to Lock Closures

    DTIC Science & Technology

    2017-06-01

    wide variety of issues lead to emergency clo- sures, yet no specific problem (s) that frequently cause unscheduled clo- sures were identified. Table 2-3...Reporting Used to create basic work orders, report problems or malfunctions, or request work to be done. Used to create and process work orders from...work order page for recording the failure class, problem , cause, and remedy (Figure 3-1). Appendix C includes a full list of failure classes

  20. Automated space processing payloads study. Volume 2, book 2: Technical report, appendices A through E. [instrument packages and space shuttles

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Experiment hardware and operational requirements for space shuttle experiments are discussed along with payload and system concepts. Appendixes are included in which experiment data sheets, chamber environmental control and monitoring, method for collection and storage of electrophoretically-separated samples, preliminary thermal evaluation of electromagnetic levitation facilities L1, L2, and L3, and applicable industrial automation equipment are discussed.

  1. 17 CFR 240.17h-2T - Risk assessment reporting requirements for brokers and dealers.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... maintains capital including debt subordinated in accordance with appendix D of § 240.15c3-1 equal to or... maintains capital including debt subordinated in accordance with appendix D of § 240.15c3-1 of less than..., customers or carries the accounts of or for customers. (3) In calculating capital and subordinated debt for...

  2. 17 CFR 240.17h-2T - Risk assessment reporting requirements for brokers and dealers.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... maintains capital including debt subordinated in accordance with appendix D of § 240.15c3-1 equal to or... maintains capital including debt subordinated in accordance with appendix D of § 240.15c3-1 of less than..., customers or carries the accounts of or for customers. (3) In calculating capital and subordinated debt for...

  3. 17 CFR 240.17h-2T - Risk assessment reporting requirements for brokers and dealers.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... maintains capital including debt subordinated in accordance with appendix D of § 240.15c3-1 equal to or... maintains capital including debt subordinated in accordance with appendix D of § 240.15c3-1 of less than..., customers or carries the accounts of or for customers. (3) In calculating capital and subordinated debt for...

  4. 17 CFR 240.17h-2T - Risk assessment reporting requirements for brokers and dealers.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... maintains capital including debt subordinated in accordance with appendix D of § 240.15c3-1 equal to or... maintains capital including debt subordinated in accordance with appendix D of § 240.15c3-1 of less than..., customers or carries the accounts of or for customers. (3) In calculating capital and subordinated debt for...

  5. 12 CFR Appendix C to Subpart A of... - Appendix C to Subpart A of Part 327

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (included in the Matters Requiring Attention, or MRA) of the bank's controls or administration of its asset... herein, provided the bank's PFR has not cited a criticism (included in the MRA) of the bank's controls or... reporting bank. (c) For all other C&I loans (whether term or non-revolver loans), the total amount of the...

  6. Antiproton Trapping for Advanced Space Propulsion Applications

    NASA Technical Reports Server (NTRS)

    Smith, Gerald A.

    1998-01-01

    The Summary of Research parallels the Statement of Work (Appendix I) submitted with the proposal, and funded effective Feb. 1, 1997 for one year. A proposal was submitted to CERN in October, 1996 to carry out an experiment on the synthesis and study of fundamental properties of atomic antihydrogen. Since confined atomic antihydrogen is potentially the most powerful and elegant source of propulsion energy known, its confinement and properties are of great interest to the space propulsion community. Appendix II includes an article published in the technical magazine Compressed Air, June 1997, which describes CERN antiproton facilities, and ATHENA. During the period of this grant, Prof. Michael Holzscheiter served as spokesman for ATHENA and, in collaboration with Prof. Gerald Smith, worked on the development of the antiproton confinement trap, which is an important part of the ATHENA experiment. Appendix III includes a progress report submitted to CERN on March 12, 1997 concerning development of the ATHENA detector. Section 4.1 reviews technical responsibilities within the ATHENA collaboration, including the Antiproton System, headed by Prof. Holzscheiter. The collaboration was advised (see Appendix IV) on June 13, 1997 that the CERN Research Board had approved ATHENA for operation at the new Antiproton Decelerator (AD), presently under construction. First antiproton beams are expected to be delivered to experiments in about one year. Progress toward assembly of the ATHENA detector and initial testing expected in 1999 has been excellent. Appendix V includes a copy of the minutes of the most recently documented collaboration meeting held at CERN of October 24, 1997, which provides more information on development of systems, including the antiproton trapping apparatus. On February 10, 1998 Prof. Smith gave a 3 hour lecture on the Physics of Antimatter, as part of the Physics for the Third Millennium Lecture Series held at MSFC. Included in Appendix VI are notes and graphs presented on the ATHENA experiment. Portable antiproton trap has been under development. The goal is to store and transport antiprotons from a production site, such as Fermilab near Chicago, to a distant site, such as Huntsville, AL, thus demonstrating the portability of antiprotons.

  7. Hanford Environmental Analytical Methods (methods as of March 1990). Volume 2, Appendix A1-O and appendix A1-I

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goheen, S.C.; McCulloch, M.; Daniel, J.L.

    1993-05-01

    Techniques in use at the Hanford Reservation as of March, 1990 for the analysis of liquids, organic wastes, soils, and sediments, are described. Limitations and applications of the techniques are included.

  8. Chesapeake Bay Tidal Flooding Study. Appendix A. Problem Identification. Appendix B. Plan Formulation, Assessment and Evaluation. Appendix C. Recreation and Natural Resources.

    DTIC Science & Technology

    1984-09-01

    principal coordinating mechanism for the Study. Since its establishment, the Advisory Group advised the District Engineer regarding study policy and...standards. Finfish in the vicinity of Tilghrnan Island include those species typical for Bay waters having a salinity of 9-14 parts per thousand (ppt...usually reaches its highest point during the year in January and February, reflecting the area’s dependence on farming and fisheries. INSTITUTIONAL

  9. 100-N Area underground storage tank closures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rowley, C.A.

    1993-08-01

    This report describes the removal/characterization actions concerning underground storage tanks (UST) at the 100-N Area. Included are 105-N-LFT, 182-N-1-DT, 182-N-2-DT, 182-N-3-DT, 100-N-SS-27, and 100-N-SS-28. The text of this report gives a summary of remedial activities. In addition, correspondence relating to UST closures can be found in Appendix B. Appendix C contains copies of Unusual Occurrence Reports, and validated sampling data results comprise Appendix D.

  10. Patent omphalomesenteric duct of the vermiform appendix in a neonate: congenital appendicoumbilical fistula.

    PubMed

    Crankson, S J; Ahmed, G S; Palkar, V

    1998-12-01

    Umbilical anomalies arise from fetal structures such as the omphalomesenteric duct (OMD) or urachus or from failure of closure of the umbilical fascial ring. Persistence of the OMD may lead to several anomalies including umbilical sinus, umbilical cyst, Meckel's diverticulum, or patent OMD (POMD). A POMD is usually associated with the ileum, but rarely may be with the caecum or appendix. We describe a POMD of the vermiform appendix and discuss the possible pathogenesis and management.

  11. Chesapeake Bay Tidal Flooding Study. Appendix D. Social and Cultural Resources. Appendix E. Engineering Design and Cost Estimates. Appendix F. Economics.

    DTIC Science & Technology

    1984-09-01

    provided by private airline. Facilities and services include fuel, storage and outside tiedown, instruction, rental planes, unicorn radio and aircraft...project the population to grow between 41 and 44.5 percent from 1980 to 2030. The greatest increases in population are anticipated for Chesapeake and...VIRGINIA DEMOGRAPHIC CHARACTERISTICS Poquoson has been one of the fastest growing cities in Virginia over the past 20 years. While the surrounding

  12. Automated Design of Board and MCM Level Digital Systems.

    DTIC Science & Technology

    1997-10-01

    Partitioning for Multicomponent Synthesis 159 Appendix K: Resource Constrained RTL Partitioning for Synthesis of Multi- FPGA Designs 169 Appendix L...digital signal processing) ar- chitectures. These target architectures, illustrated in Figure 1, can contain application-specific ASICS, FPGAs ...synthesis tools for ASIC, FPGA and MCM synthesis (Figure 8). Multicomponent Partitioning Engine The par- titioning engine is a hierarchical partitioning

  13. 40 CFR Appendix A to Subpart A of... - Tables

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... precursor of PM2.5. Table 2a to Appendix A of Subpart A—Data Elements for Reporting on Emissions From Point Sources, Where Required by 40 CFR 51.30 Data elements Every-yearreporting Three-yearreporting (1... phone number ✓ ✓ (6) FIPS code ✓ ✓ (7) Facility ID codes ✓ ✓ (8) Unit ID code ✓ ✓ (9) Process ID code...

  14. Laparoscopic Appendectomy.

    DTIC Science & Technology

    1992-04-14

    is a minimally invasive endoscopic surgical procedure to remove the appendix. From December 1990 to February 1991, Tripler Army Medical Center...appendectomy appears to be a safe, cost-effective, minimally invasive surgical technique that in skilled hands may be used to remove most diseased appendices...requiring surgical intervention [1]. Management of this disease process has traditionally involved the surgical removal of the appendix through a right

  15. 40 CFR 60.45c - Compliance and performance test methods and procedures for particulate matter.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and procedures for particulate matter. 60.45c Section 60.45c Protection of Environment ENVIRONMENTAL... Administrator when necessitated by process variables or other factors. (5) For Method 5 or 5B of appendix A of... (CO2) measurement shall be obtained simultaneously with each run of Method 5, 5B, or 17 of appendix A...

  16. 10 CFR Appendix G to Part 110 - Illustrative List of Plasma Separation Enrichment Plant Equipment and Components Under NRC Export...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Illustrative List of Plasma Separation Enrichment Plant... Appendix G to Part 110—Illustrative List of Plasma Separation Enrichment Plant Equipment and Components Under NRC Export Licensing Authority Note—In the plasma separation process, a plasma of uranium ions...

  17. 10 CFR Appendix G to Part 110 - Illustrative List of Plasma Separation Enrichment Plant Equipment and Components Under NRC Export...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Illustrative List of Plasma Separation Enrichment Plant... Appendix G to Part 110—Illustrative List of Plasma Separation Enrichment Plant Equipment and Components Under NRC Export Licensing Authority Note—In the plasma separation process, a plasma of uranium ions...

  18. 10 CFR Appendix G to Part 110 - Illustrative List of Plasma Separation Enrichment Plant Equipment and Components Under NRC Export...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Illustrative List of Plasma Separation Enrichment Plant... Appendix G to Part 110—Illustrative List of Plasma Separation Enrichment Plant Equipment and Components Under NRC Export Licensing Authority Note—In the plasma separation process, a plasma of uranium ions...

  19. 10 CFR Appendix G to Part 110 - Illustrative List of Plasma Separation Enrichment Plant Equipment and Components Under NRC Export...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Illustrative List of Plasma Separation Enrichment Plant... Appendix G to Part 110—Illustrative List of Plasma Separation Enrichment Plant Equipment and Components Under NRC Export Licensing Authority Note—In the plasma separation process, a plasma of uranium ions...

  20. 10 CFR Appendix G to Part 110 - Illustrative List of Plasma Separation Enrichment Plant Equipment and Components Under NRC Export...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Illustrative List of Plasma Separation Enrichment Plant... Appendix G to Part 110—Illustrative List of Plasma Separation Enrichment Plant Equipment and Components Under NRC Export Licensing Authority Note: In the plasma separation process, a plasma of uranium ions...

  1. 40 CFR Appendix E to Part 300 - Oil Spill Response

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... management authority of the United States. (b) This appendix is designed to facilitate efficient, coordinated... and Health Administration RSPA—Research and Special Programs Administration USCG—United States Coast... changes to the NCP designed to improve the effectiveness of the national response system, including...

  2. SimCenter Hawaii Technology Enabled Learning and Intervention Systems

    DTIC Science & Technology

    2008-01-01

    manikin training in acquiring triage skills and self -efficacy. Phase II includes the development of the VR training scenarios, which includes iterative...Task A5. Skills acquisition relative to self -efficacy study See Appendix F, Mass Casualty Triage Training using Human Patient Simulators Improves...relative to self -efficacy study • See Appendix F, Mass Casualty Triage Training using Human Patient Simulators Improves Speed and Accuracy of First

  3. 17 CFR 404.2 - Records to be made and kept current by registered government securities brokers and dealers...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... paragraph (a) reflecting the sale and redemption of United States Savings Bonds, United States Savings Notes... capital of at least $20,000,000, including debt subordinated in accordance with Appendix D of § 240.15c3-1...,000, including debt subordinated in accordance with Appendix D of § 240.15c3-1 of this title, as...

  4. 17 CFR 404.2 - Records to be made and kept current by registered government securities brokers and dealers...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... paragraph (a) reflecting the sale and redemption of United States Savings Bonds, United States Savings Notes... capital of at least $20,000,000, including debt subordinated in accordance with Appendix D of § 240.15c3-1...,000, including debt subordinated in accordance with Appendix D of § 240.15c3-1 of this title, as...

  5. 17 CFR 404.2 - Records to be made and kept current by registered government securities brokers and dealers...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... paragraph (a) reflecting the sale and redemption of United States Savings Bonds, United States Savings Notes... capital of at least $20,000,000, including debt subordinated in accordance with Appendix D of § 240.15c3-1...,000, including debt subordinated in accordance with Appendix D of § 240.15c3-1 of this title, as...

  6. 17 CFR 404.2 - Records to be made and kept current by registered government securities brokers and dealers...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... paragraph (a) reflecting the sale and redemption of United States Savings Bonds, United States Savings Notes... capital of at least $20,000,000, including debt subordinated in accordance with Appendix D of § 240.15c3-1...,000, including debt subordinated in accordance with Appendix D of § 240.15c3-1 of this title, as...

  7. Discovery management workshop

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Two dozen participants assembled under the direction of the NASA Solar System Exploration Division (SEED) April 13-15, 1993. Participants supported the goals of cheaper and faster solar system exploration. The workshop concluded that the Discovery Program concept and goals are viable. Management concerns are articulated in the final report. Appendix A includes lists of participants in alphabetical order, by functional area, and by organization type. Appendix B includes the agenda for the meeting.

  8. ASTP experiment support data processing

    NASA Technical Reports Server (NTRS)

    Osburn, R. K.; Barnett, E. L.; Moore, H. L.; Moore, J. B.; Ball, J. R.

    1975-01-01

    Activities associated with the generation of ASTP experiment support data in the areas of spacecraft ephemeris and orientation and instrument pointing and field-of-view are documented. It is intended that this document represent a cradle-to-grave chronicle of these activities. To satisfy this intent while facilitating the ready dissemination of information, the document is being published twice. The first publication, scheduled for release prior to ASTP liftoff, includes all preflight phases of the experiment support activity in addition to those appendixes that do not pertain to any mission-specific data. The second publication will provide any required updates to the original documentation and will add all mission-specific data, including documentation of all postflight data processing activities and data archiving information.

  9. 14 CFR Appendix D to Part 25 - Appendix D to Part 25

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... considered: (1) Flight path control. (2) Collision avoidance. (3) Navigation. (4) Communications. (5... flight, power, and equipment controls, including emergency fuel shutoff valves, electrical controls... crew action to guard against loss of hydraulic or electric power to flight controls or to other...

  10. Research Involving Children: Appendix to Report and Recommendations.

    ERIC Educational Resources Information Center

    Commission for the Protection of Human Subjects of Biomedical and Behavioral Research, Washington, DC.

    The appendix contains papers, reports, and other materials that were reviewed by the National Commission for the Protection of Human Subjects of Biomedical and Behavioral Research during its deliberations on research involving children. Entries include the following titles and authors: "Research Involving Children" (Survey Research Center); "Law…

  11. 40 CFR Appendix to Part 30 - Contract Provisions

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... NON-PROFIT ORGANIZATIONS Pt. 30, App. Appendix to Part 30—Contract Provisions All contracts awarded by a recipient, including small purchases, shall contain the following provisions as applicable: 1... unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials...

  12. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Guidelines (see Appendix E to this part, section 13, for availability), which satisfy Oil Pollution Act (OPA... contracts with response contractors shall be included in this section so that the availability of resources...: ___ Direction from City: ___ Section: ____ Township: ____ Range: ____ Borough: ____ Container Type: ___ Tank Oil...

  13. 49 CFR 256.11 - Applications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... accordance with appendix M of Office of Management and Budget Circular A-102, applicants shall use the pre... appendix M of Office of Management and Budget Circular A-102. Applicants shall include under Part IV... of Management and Budget Circular A-102, adequate procedures for financial control, accounting, and...

  14. Multinational Exchange Mechanisms of Educational Audio-Visual Materials. Appendixes.

    ERIC Educational Resources Information Center

    Center of Studies and Realizations for Permanent Education, Paris (France).

    These appendixes contain detailed information about the existing audiovisual material exchanges which served as the basis for the analysis contained in the companion report. Descriptions of the objectives, structure, financing and services of the following national and international organizations are included: (1) Educational Resources Information…

  15. Redesign of Advanced Education Processes the United States Coast Guard

    DTIC Science & Technology

    1999-09-01

    educational level. Els are assigned to help track individuals with specialized training and to facilitate statistical data collection. The El is used by...just like every other officer in the Coast Guard. Currently, the Coast Guard’s personnel database does not include data on advanced education ...Appendix A. 56 • Advanced Education is not a searchable field in the Coast Guard’s Personnel Data System. PMs and AOs do not have direct access to

  16. OCD: The offshore and coastal dispersion model. Volume 2. Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DiCristofaro, D.C.; Hanna, S.R.

    1989-11-01

    The Offshore and Coastal Dispersion (OCD) Model has been developed to simulate the effect of offshore emissions from point, area, or line sources on the air quality of coastal regions. The OCD model was adapted from the EPA guideline model MPTER (EPA, 1980). Modifications were made to incorporate overwater plume transport and dispersion as well as changes that occur as the plume crosses the shoreline. This is a revised OCD model, the fourth version to date. The volume is an appendices for the OCD documentation, included are three appendices: Appendix A the OCD computer program, Appendix B an Analysis Post-processor,more » Appendix C Offshore Meteorological data Collection Instrumentation, also included are general References.« less

  17. MRI for appendicitis in pregnancy: is seeing believing? clinical outcomes in cases of appendix nonvisualization.

    PubMed

    Al-Katib, Sayf; Sokhandon, Farnoosh; Farah, Michael

    2016-12-01

    The primary objective of this study was to determine the clinical outcomes in cases of appendix nonvisualization with MRI in pregnant patients with suspected appendicitis and the implications of appendix nonvisualization for excluding appendicitis. Fifty-eight pregnant patients with suspected appendicitis evaluated with MRI at three centers from a single institution were retrospectively reviewed by three radiologists with varying levels of abdominal imaging experience. All scans were performed on a 1.5-Tesla Siemens unit. Cases were evaluated for diagnostic quality, visualization of the appendix, presence of appendicitis, and alternate diagnoses. Clinical outcomes were gathered from the electronic medical record. Of the 58 patients who underwent MRI for suspected appendicitis, 50 cases were considered adequate diagnostic quality by all three radiologists. The rate of appendix visualization among the three radiologists ranged from 60 to 76% (p = 0.44). The appendix was nonvisualized by at least one of the three radiologists in 25 cases (50%). Of these, none had a final diagnosis of appendicitis including one patient who underwent appendectomy. MRI suggested an alternate diagnosis in 6 (24%) patients with appendix nonvisualization. For the three reviewers, the agreement level on whether or not the appendix was visualized on the MRI had a Light's kappa value of 0.526, indicating a "moderate" level of agreement (p value < 0.01). Despite only moderate level of interobserver agreement for appendix visualization, appendix nonvisualization on MRI in pregnant patients with suspected appendicitis confers a significant reduction in the risk of appendicitis compared to all comers as long as the study is adequate diagnostic quality and there are no secondary signs of appendicitis present.

  18. Validation of the AMC-71 Mobility Model. Appendix A: Vehicle Data. Appendix B: Location and Description of Test Sites. Appendix C: Definitions of Terrain Terms and Procedures Used to Collect Terrain Data for Validation Tests. Appendix D: Basic Terrain Data

    DTIC Science & Technology

    1976-03-01

    vegetation of the area, including maples, poplars, and pines dith scattered low shrubs and blueberry patches growing in loamy sand (SP-SM) with some...mostly lichens, grasses, and blueberry bushes along with scattered currant bushes as vegetable cover. Also, of the remaining 2204 ft, 568 ft was open with...NUHI1ER 4-:. TERRAIN UNIT S CONTINUES -40- -•r’ W -0 _..• ,- . STAT IO (NS q4 4 S C 1 4C I.- /=-too 7 ’o S- - S 4,- -. - 7s 4 Profile- -k-, jp" Continued

  19. One library's experience with review and selection of chat software for reference.

    PubMed

    Behm, Leslie M

    2003-01-01

    When Michigan State University (MSU) Libraries decided to make the foray into virtual reference, the first thing that needed to be done was to decide on the software to use. This article discusses the process used including the items considered essential (deal-breakers) for software to make the first cut, what other features needed to be included, and what features would be useful but were not critical. A literature review of some useful current articles on virtual reference is included. The vendor and software ultimately selected was not one of the original vendors; how MSU Libraries was able to evaluate and select Docutek is presented. A matrix for software comparison is included in the appendix.

  20. 40 CFR Appendix A to Subpart Dddd... - Alternative Procedure To Determine Capture Efficiency From Enclosures Around Hot Presses in the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of average velocity during the run and using these data, in conjunction with the pre- and post-test..., you may choose to follow the post-test calibration procedures of Method 320 in appendix A to 40 CFR... of hazardous air pollutants during the press process. This test method requires a minimum of three...

  1. Environmental Impact Analysis Process. Environmental Impact Statement for Realignment of Beale Air Force Base

    DTIC Science & Technology

    1990-04-01

    CONTACTED .......... 6-2 APPENDIX A.- Average Daily Air Emissions Inventory for Yuba County .............................. A-1 APPENDIX B...Civilian Wage and Salary Employment, Yuba City Metropolitan Statistical Area, 1987 (Yuba and Sutter Counties , CA) ................... 3-46 vii LIST OF...Beale AFB Students Enrolled in Yuba and Sutter County Public Schools, FY 1989-90, by Assistance Category and School Capacity ................... 3-50 4

  2. In-Plant Reuse of Pollution Abated Waters.

    DTIC Science & Technology

    1984-08-01

    Carbon Treatment Facility Prefilters D-10 Spent Carbon Receiving Tank EZ D-11 Powdered Carbon Feeder System E. Process Chemical Assay/Monitoring...PBA manufacturing complex, several wastewater treatment facilities were built to treat wastewater from various plants . This task deals with...all of which discharge to the Central Treatment Facility (Appendix K-I). The plant is permitted (Appendix I-I) by EPA and consists of a lime/alum

  3. Development of standardized air-blown coal gasifier/gas turbine concepts for future electric power systems, Volume 4. Appendix C: Design and performance of standardized fixed bed air-blown gasifier IGCC systems for future electric power generation: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-02-01

    This appendix is a compilation of work done to predict overall cycle performance from gasifier to generator terminals. A spreadsheet has been generated for each case to show flows within a cycle. The spreadsheet shows gaseous or solid composition of flow, temperature of flow, quantity of flow, and heat heat content of flow. Prediction of steam and gas turbine performance was obtained by the computer program GTPro. Outputs of all runs for each combined cycle reviewed has been added to this appendix. A process schematic displaying all flows predicted through GTPro and the spreadsheet is also added to this appendix.more » The numbered bubbles on the schematic correspond to columns on the top headings of the spreadsheet.« less

  4. 14 CFR Appendix A to Part 35 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS Pt. 35, App. A Appendix A to Part 35—Instructions for... Maintenance Section. (1) Introduction information that includes an explanation of the propeller's features and data to the extent necessary for maintenance or preventive maintenance. (2) A detailed description of...

  5. 14 CFR Appendix A to Part 29 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Pt. 29, App. A Appendix A to Part 29... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  6. 14 CFR Appendix A to Part 35 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS Pt. 35, App. A Appendix A to Part 35—Instructions for... Maintenance Section. (1) Introduction information that includes an explanation of the propeller's features and data to the extent necessary for maintenance or preventive maintenance. (2) A detailed description of...

  7. 14 CFR Appendix A to Part 27 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Pt. 27, App. A Appendix A to Part 27... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  8. 14 CFR Appendix A to Part 27 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Pt. 27, App. A Appendix A to Part 27... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  9. 14 CFR Appendix A to Part 27 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Pt. 27, App. A Appendix A to Part 27... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  10. 14 CFR Appendix A to Part 29 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Pt. 29, App. A Appendix A to Part 29... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  11. 14 CFR Appendix A to Part 35 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS Pt. 35, App. A Appendix A to Part 35—Instructions for... Maintenance Section. (1) Introduction information that includes an explanation of the propeller's features and data to the extent necessary for maintenance or preventive maintenance. (2) A detailed description of...

  12. 14 CFR Appendix A to Part 29 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Pt. 29, App. A Appendix A to Part 29... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  13. 14 CFR Appendix A to Part 27 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Pt. 27, App. A Appendix A to Part 27... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  14. 14 CFR Appendix A to Part 35 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS Pt. 35, App. A Appendix A to Part 35—Instructions for... Maintenance Section. (1) Introduction information that includes an explanation of the propeller's features and data to the extent necessary for maintenance or preventive maintenance. (2) A detailed description of...

  15. 14 CFR Appendix A to Part 35 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS Pt. 35, App. A Appendix A to Part 35—Instructions for... Maintenance Section. (1) Introduction information that includes an explanation of the propeller's features and data to the extent necessary for maintenance or preventive maintenance. (2) A detailed description of...

  16. 14 CFR Appendix A to Part 29 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Pt. 29, App. A Appendix A to Part 29... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  17. 14 CFR Appendix A to Part 29 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Pt. 29, App. A Appendix A to Part 29... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  18. 14 CFR Appendix A to Part 27 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Pt. 27, App. A Appendix A to Part 27... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  19. 49 CFR Appendix B to Part 192 - Qualification of Pipe

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... specification listed in section I of this appendix: (1) Physical (mechanical) properties of pipe, including...). II. Steel pipe of unknown or unlisted specification. A. Bending Properties. For pipe 2 inches (51... impair the strength or tightness of the pipe. D. Tensile Properties. If the tensile properties of the...

  20. 49 CFR Appendix B to Part 192 - Qualification of Pipe

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... specification listed in section I of this appendix: (1) Physical (mechanical) properties of pipe, including...). II. Steel pipe of unknown or unlisted specification. A. Bending Properties. For pipe 2 inches (51... impair the strength or tightness of the pipe. D. Tensile Properties. If the tensile properties of the...

  1. 32 CFR Appendix A of Part 216 - Military Recruiting Sample Letter of Inquiry

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION Information requirements. Pt. 216, App. A Appendix A of Part 216—Military..., Transportation, Labor, Health and Human Services, Education, and related agencies to institutions of higher education (including any subelements of such institutions) that have a policy or practice of denying...

  2. 32 CFR Appendix A of Part 216 - Military Recruiting Sample Letter of Inquiry

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION Information requirements. Pt. 216, App. A Appendix A of Part 216—Military..., Transportation, Labor, Health and Human Services, Education, and related agencies to institutions of higher education (including any subelements of such institutions) that have a policy or practice of denying...

  3. 32 CFR Appendix A of Part 216 - Military Recruiting Sample Letter of Inquiry

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION Information requirements. Pt. 216, App. A Appendix A of Part 216—Military..., Transportation, Labor, Health and Human Services, Education, and related agencies to institutions of higher education (including any subelements of such institutions) that have a policy or practice of denying...

  4. 14 CFR Appendix L to Part 141 - Pilot Ground School Course

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Pilot Ground School Course L Appendix L to Part 141 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... ground school must include training on the aeronautical knowledge areas that are: (a) Needed to safely...

  5. 14 CFR Appendix L to Part 141 - Pilot Ground School Course

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot Ground School Course L Appendix L to Part 141 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... ground school must include training on the aeronautical knowledge areas that are: (a) Needed to safely...

  6. 12 CFR Appendix A to Part 325 - Statement of Policy on Risk-Based Capital

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... qualifying and excess capital, calculate risk-weighted assets, calculate market risk equivalent assets and... and control financial and operating risks, including the risk presented by concentrations of credit....(6)(ii) of this appendix A), and subsidiaries that are engaged in non-financial activities are not...

  7. 36 CFR Appendix A to Part 1210 - Contract Provisions

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Pt. 1210, App. A Appendix A to Part 1210—Contract Provisions All contracts, awarded by a recipient including small purchases, shall contain the following... not apply to the purchases of supplies or materials or articles ordinarily available on the open...

  8. 24 CFR Appendix A to Part 84 - Contract Provisions

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Pt. 84, App. A Appendix A to Part 84—Contract Provisions All contracts, awarded by a recipient including small purchases, shall contain the following... which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of...

  9. 41 CFR Appendix A to Part 105 - 72-Contract Provisions

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Pt. 105-72, App. A Appendix A to Part 105-72—Contract Provisions All contracts, awarded by a recipient including small purchases, shall contain the following... not apply to the purchases of supplies or materials or articles ordinarily available on the open...

  10. 7 CFR Appendix A to Part 3019 - Contract Provisions

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Pt. 3019, App. A Appendix A to Part 3019—Contract Provisions All contracts, awarded by a recipient including small purchases, shall contain the... not apply to the purchases of supplies or materials or articles ordinarily available on the open...

  11. 15 CFR Appendix A to Part 14 - Contract Provisions

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COMMERCIAL ORGANIZATIONS Pt. 14, App. A Appendix A to Part 14—Contract Provisions All contracts, awarded by a recipient including small purchases, shall contain the following provisions as applicable: 1. Equal... dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily...

  12. 24 CFR Appendix A to Part 84 - Contract Provisions

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Pt. 84, App. A Appendix A to Part 84—Contract Provisions All contracts, awarded by a recipient including small purchases, shall contain the following... which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of...

  13. 34 CFR Appendix A to Part 74 - Contract Provisions

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Pt. 74, App. A Appendix A to Part 74—Contract Provisions All contracts, awarded by a recipient including small purchases, shall... not apply to the purchases of supplies or materials or articles ordinarily available on the open...

  14. 28 CFR Appendix A to Part 70 - Contract Provisions

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... NON-PROFIT ORGANIZATIONS Pt. 70, App. A Appendix A to Part 70—Contract Provisions All contracts, awarded by a recipient including small purchases, must contain the following provisions as applicable: 1... purchases of supplies or materials or articles ordinarily available on the open market, or contracts for...

  15. 22 CFR Appendix A to Part 226 - Contract Provisions

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...-GOVERNMENTAL ORGANIZATIONS Pt. 226, App. A Appendix A to Part 226—Contract Provisions All contracts, awarded by a recipient including small purchases, shall contain the following provisions as applicable: 1... not apply to the purchases of supplies or materials or articles ordinarily available on the open...

  16. 38 CFR Appendix A to Part 49 - Contract Provisions

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Pt. 49, App. A Appendix A to Part 49—Contract Provisions All contracts, awarded by a recipient including small purchases, shall contain the following provisions as... purchases of supplies or materials or articles ordinarily available on the open market, or contracts for...

  17. 29 CFR Appendix A to Part 32 - Appendix A to Part 32

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... permit a recipient to underemploy or job-stereotype that person. A restructured job, for example, could... assistant. (g) Decrease reliance solely on one form of communication. For example, for deaf participants or..., this may include making some communications available in braille, enlarged print, or on cassette...

  18. 25 CFR Appendix A to Subpart E - IRR Program Functions That Are Not Otherwise Contractible

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... functions listed in this appendix cannot be included in a self-determination contract or self-governance... Assistance Program, Recreational Travel and Tourism, Transit Program, ERFO Program, Presidential initiatives (Millennium Trails, Lewis & Clark, Western Tourism Policy Group); 15. Participating in and supporting tribal...

  19. 20 CFR 404.1569 - Listing of Medical-Vocational Guidelines in appendix 2.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Listing of Medical-Vocational Guidelines in appendix 2. 404.1569 Section 404.1569 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE... includes information about jobs (classified by their exertional and skill requirements) that exist in the...

  20. 12 CFR Appendix A to Part 325 - Statement of Policy on Risk-Based Capital

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... qualifying and excess capital, calculate risk-weighted assets, calculate market risk equivalent assets and... and control financial and operating risks, including the risk presented by concentrations of credit....(6)(ii) of this appendix A), and subsidiaries that are engaged in non-financial activities are not...

  1. 12 CFR Appendix A to Part 325 - Statement of Policy on Risk-Based Capital

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... qualifying and excess capital, calculate risk-weighted assets, calculate market risk equivalent assets and... and control financial and operating risks, including the risk presented by concentrations of credit....(6)(ii) of this appendix A), and subsidiaries that are engaged in non-financial activities are not...

  2. 12 CFR Appendix A to Part 325 - Statement of Policy on Risk-Based Capital

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... qualifying and excess capital, calculate risk-weighted assets, calculate market risk equivalent assets and... and control financial and operating risks, including the risk presented by concentrations of credit....(6)(ii) of this appendix A), and subsidiaries that are engaged in non-financial activities are not...

  3. Real time programming environment for Windows, Appendix A

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-04-05

    This appendix contains all source code for the RTProE system. The following file contents are included: pdb.h; hgen.l; hgen.y; igen.l; igen.y; pdm.l; pdm.y; rtdata.l; rtdata.y; framegen.c; librt.c; librt.h; rtsched.c; build.tsh; sde.tcl; rtsched.def.

  4. 25 CFR Appendix A to Subpart E - IRR Program Functions That Are Not Otherwise Contractible

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... functions listed in this appendix cannot be included in a self-determination contract or self-governance... transportation improvement programs developed by tribes or other contractors; 2. Reviewing IRR long-range.... Reviewing long-range transportation plans; 3. Reviewing and approving IRR transportation improvement...

  5. 25 CFR Appendix A to Subpart E - IRR Program Functions That Are Not Otherwise Contractible

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... functions listed in this appendix cannot be included in a self-determination contract or self-governance... transportation improvement programs developed by tribes or other contractors; 2. Reviewing IRR long-range.... Reviewing long-range transportation plans; 3. Reviewing and approving IRR transportation improvement...

  6. 14 CFR Appendix J to Part 417 - Ground Safety Analysis Report

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... information required by this appendix. J417.3Ground safety analysis report chapters (a) Introduction. A ground... analysis report must include a chapter that provides detailed safety information about each launch vehicle... data. A hazard analysis form must contain or reference all information necessary to understand the...

  7. 14 CFR Appendix J to Part 417 - Ground Safety Analysis Report

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... information required by this appendix. J417.3Ground safety analysis report chapters (a) Introduction. A ground... analysis report must include a chapter that provides detailed safety information about each launch vehicle... data. A hazard analysis form must contain or reference all information necessary to understand the...

  8. 14 CFR Appendix J to Part 417 - Ground Safety Analysis Report

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... information required by this appendix. J417.3Ground safety analysis report chapters (a) Introduction. A ground... analysis report must include a chapter that provides detailed safety information about each launch vehicle... data. A hazard analysis form must contain or reference all information necessary to understand the...

  9. 14 CFR Appendix J to Part 417 - Ground Safety Analysis Report

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... information required by this appendix. J417.3Ground safety analysis report chapters (a) Introduction. A ground... analysis report must include a chapter that provides detailed safety information about each launch vehicle... data. A hazard analysis form must contain or reference all information necessary to understand the...

  10. 14 CFR Appendix J to Part 417 - Ground Safety Analysis Report

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... information required by this appendix. J417.3Ground safety analysis report chapters (a) Introduction. A ground... analysis report must include a chapter that provides detailed safety information about each launch vehicle... data. A hazard analysis form must contain or reference all information necessary to understand the...

  11. Appendix A : glossary of terms and appendix B : list of selected publications

    DOT National Transportation Integrated Search

    1991-02-01

    Selected data on highway toll facilities in the United States are contained in Table T-1 of this report based on a survey of facilities in operation, financed, or under construction as of January 1, 1990. The data include information such as the name...

  12. 49 CFR 396.17 - Periodic inspection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... appendix G of this subchapter. The term commercial motor vehicle includes each vehicle in a combination... appendix G of this subchapter has passed an inspection in accordance with the terms of this section at... documentation, based on the inspection report (e.g., sticker or decal), which contains the following information...

  13. A Curriculum Activities Guide to Water Pollution and Environmental Studies, Volume II - Appendices.

    ERIC Educational Resources Information Center

    Hershey, John T., Ed.; And Others

    This publication, Volume II of a two volume set of water pollution studies, contains seven appendices which support the studies. Appendix 1, Water Quality Parameters, consolidates the technical aspects of water quality including chemical, biological, computer program, and equipment information. Appendix 2, Implementation, outlines techniques…

  14. Using archived ITS data to measure the operational benefits of a system-wide adaptive ramp metering system : appendix online 2 : I\\0x2010 205 NB speed flow plots.

    DOT National Transportation Integrated Search

    2008-12-01

    The appendix includes various speed flow plots, including: I-205 NB, Gladstone MP 11.05; I-205 NB, Gladstone Hway MP 12.94; I-205 NB, Lawnfield MP 13.58; I-205 NB, Sunnybrook MP 14.32; I-205 NB, Sunnyside MP 14.7; I-205 NB, Johnson Creek MP 16.2; I-2...

  15. Using archived ITS data to measure the operational benefits of a system-wide adaptive ramp metering system : appendix online 4 : I\\0x2010205 NB flow\\0x2010occupancy plots.

    DOT National Transportation Integrated Search

    2008-12-01

    The appendix includes various flow-occupancy plots, including: I-205 NB, Gladstone MP 11.05; I-205 NB, Gladstone Hway MP 12.94; I-205 NB, Lawnfield MP 13.58; I-205 NB, Sunnybrook MP 14.32; I-205 NB, Sunnyside MP 14.7; I-205 NB, Johnson Creek MP 16.2;...

  16. Using archived ITS data to measure the operational benefits of a system-wide adaptive ramp metering system : appendix online 3 : I\\0x2010205 NB speed\\0x2010occupancy plots.

    DOT National Transportation Integrated Search

    2008-12-01

    The appendix includes various speed-occupancy plots, including: I-205 NB, Gladstone MP 11.05; I-205 NB, Gladstone Hway MP 12.94; I-205 NB, Lawnfield MP 13.58; I-205 NB, Sunnybrook MP 14.32; I-205 NB, Sunnyside MP 14.7; I-205 NB, Johnson Creek MP 16.2...

  17. The Development and Implementation of a Minimum Objective System in the Hinesburg Elementary School. Hinesburg Elementary School Minimum Objectives for Science, Physical Education, Music, Library. Appendix B: Vol. 3.

    ERIC Educational Resources Information Center

    Morse, Margaret; And Others

    The appendix to the report of the minimum objective system of the Hinesburg Elementary School (Vermont) includes objectives for science, physical education, music, and library skills, from the kindergarten through grade 6 levels. Most objectives are presented in the format of condition (or task), student behavior, and criteria. Also included are…

  18. Using archived ITS data to measure the operational benefits of a system-wide adaptive ramp metering system : appendix online 5 : I-205 NB ramp flow & ML speed-flow plots.

    DOT National Transportation Integrated Search

    2008-12-01

    The appendix includes various ramp flow and ML speed-flow plots, including: I-205 NB, Gladstone MP 11.05; I-205 NB, Gladstone Hway MP 12.94; I-205 NB, Lawnfield MP 13.58; I-205 NB, Sunnybrook MP 14.32; I-205 NB, Sunnyside MP 14.7; I-205 NB, Johnson C...

  19. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspectionmore » plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.« less

  20. Space station needs, attributes and architectural options study. Volume 2: Appendix C

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Planetary science, Earth observation, space physics, astronomy, solar astronomy, life/biological sciences, materials processing, commercial materials processing, commercial communications, and technology development are discussed.

  1. Supervisory Management in the Water/Wastewater Field: Self Study Program. Revised Second Edition. Textbook and Student Manual. Lessons 1-7 and Appendix. Executive Programs of the Graduate School of Business Administration of Michigan State University.

    ERIC Educational Resources Information Center

    Liebrenz, Marilyn L., Ed.

    This document is the student manual for a self-study course on managerial principles as they relate to the water or wastewater treatment field. Each of the seven lessons is concerned with a segment of the management process and corresponds to reading material in the accompanying text. An objective and subjective test portion is included in each…

  2. Orbital flight test shuttle external tank aerothermal flight evaluation, volume 3

    NASA Technical Reports Server (NTRS)

    Praharaj, Sarat C.; Engel, Carl D.; Warmbrod, John D.

    1986-01-01

    This 3-volume report discusses the evaluation of aerothermal flight measurements made on the orbital flight test Space Shuttle External Tanks (ETs). Six ETs were instrumented to measure various quantities during flight; including heat transfer, pressure, and structural temperature. The flight data was reduced and analyzed against math models established from an extensive wind tunnel data base and empirical heat-transfer relationships. This analysis has supported the validity of the current aeroheating methodology and existing data base; and, has also identified some problem areas which require methodology modifications. Volume 1 is the Executive Summary. Volume 2 contains Appendix A (Aerothermal Comparisons), and Appendix B (Flight-Derived h sub 1/h sub u vs. M sub inf. Plots). This is Volume 3, containing Appendix C (Comparison of Interference Factors between OFT Flight, Prediction and 1H-97A Data), Appendix D (Freestream Stanton Number and Reynolds Number Correlation for Flight and Tunnel Data), and Appendix E (Flight-Derived h sub i/h sub u Tables).

  3. Orbital flight test shuttle external tank aerothermal flight evaluation, volume 2

    NASA Technical Reports Server (NTRS)

    Praharaj, Sarat C.; Engel, Carl D.; Warmbrod, John D.

    1986-01-01

    This 3-volume report discusses the evaluation of aerothermal flight measurements made on the orbital flight test Space Shuttle External Tanks (ETs). Six ETs were instrumented to measure various quantities during flight; including heat transfer, pressure, and structural temperature. The flight data was reduced and analyzed against math models established from an extensive wind tunnel data base and empirical heat-transfer relationships. This analysis has supported the validity of the current aeroheating methodology and existing data base; and, has also identified some problem areas which require methodology modifications. Volume 1 is the Executive Summary. This is volume 2, containing Appendix A (Aerothermal Comparisons), and Appendix B (Flight-Derived h sub i/h sub u vs. M sub inf. Plots). Volume 3 contains Appendix C (Comparison of Interference Factors between OFT Flight, Prediction and 1H-97A Data), Appendix D (Freestream Stanton Number and Reynolds Number Correlation for Flight and Tunnel Data), and Appendix E (Flight-Derived h sub i/h sub u Tables).

  4. 14 CFR Appendix G to Part 151 - Appendix G to Part 151

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... itemization of typical eligible and ineligible items of road construction covered by § 151.89 of this chapter: Typical Eligible Items 1. Entrance roads. 2. Service roads for access to public areas. 3. Service roads for airport maintenance (including perimeter airport service road within airport boundary and not for...

  5. 31 CFR Appendix A to Part 570 - Executive Order 13566

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... measures against the people of Libya, including by using weapons of war, mercenaries, and wanton violence... Annex to this order, and to take necessary action to give effect to that determination. Sec. 12. The... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY LIBYAN SANCTIONS REGULATIONS Pt. 570, App. A Appendix A...

  6. 31 CFR Appendix A to Part 570 - Executive Order 13566

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... measures against the people of Libya, including by using weapons of war, mercenaries, and wanton violence... Annex to this order, and to take necessary action to give effect to that determination. Sec. 12. The... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY LIBYAN SANCTIONS REGULATIONS Pt. 570, App. A Appendix A...

  7. 31 CFR Appendix A to Part 570 - Executive Order 13566

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... measures against the people of Libya, including by using weapons of war, mercenaries, and wanton violence... Annex to this order, and to take necessary action to give effect to that determination. Sec. 12. The... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY LIBYAN SANCTIONS REGULATIONS Pt. 570, App. A Appendix A...

  8. 31 CFR Appendix A to Part 570 - Executive Order 13566

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... measures against the people of Libya, including by using weapons of war, mercenaries, and wanton violence... Annex to this order, and to take necessary action to give effect to that determination. Sec. 12. The... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY LIBYAN SANCTIONS REGULATIONS Pt. 570, App. A Appendix A...

  9. 14 CFR Appendix B to Part 60 - Qualification Performance Standards for Airplane Flight Training Devices

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Qualification Performance Standards for Airplane Flight Training Devices B Appendix B to Part 60 Aeronautics and Space FEDERAL AVIATION... encourages the use of electronic media for all communication, including any record, report, request, test, or...

  10. 14 CFR Appendix B to Part 60 - Qualification Performance Standards for Airplane Flight Training Devices

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Qualification Performance Standards for Airplane Flight Training Devices B Appendix B to Part 60 Aeronautics and Space FEDERAL AVIATION... encourages the use of electronic media for all communication, including any record, report, request, test, or...

  11. 14 CFR Appendix B to Part 60 - Qualification Performance Standards for Airplane Flight Training Devices

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Qualification Performance Standards for Airplane Flight Training Devices B Appendix B to Part 60 Aeronautics and Space FEDERAL AVIATION... encourages the use of electronic media for all communication, including any record, report, request, test, or...

  12. 14 CFR Appendix B to Part 60 - Qualification Performance Standards for Airplane Flight Training Devices

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Qualification Performance Standards for Airplane Flight Training Devices B Appendix B to Part 60 Aeronautics and Space FEDERAL AVIATION... encourages the use of electronic media for all communication, including any record, report, request, test, or...

  13. 14 CFR Appendix B to Part 60 - Qualification Performance Standards for Airplane Flight Training Devices

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Qualification Performance Standards for Airplane Flight Training Devices B Appendix B to Part 60 Aeronautics and Space FEDERAL AVIATION... encourages the use of electronic media for all communication, including any record, report, request, test, or...

  14. 12 CFR Appendix A to Part 193 - Financial Statement Line Items

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REQUIREMENTS Pt. 193, App. A Appendix A to Part 193—Financial Statement Line Items I. Balance Sheet Assets 1... deposits; however, time deposits and short-term certificates of deposits are not generally included in... loans in each of the following categories: (i) Real estate mortgage; (ii) real estate construction; (iii...

  15. 12 CFR Appendix A to Part 193 - Financial Statement Line Items

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REQUIREMENTS Pt. 193, App. A Appendix A to Part 193—Financial Statement Line Items I. Balance Sheet Assets 1... deposits; however, time deposits and short-term certificates of deposits are not generally included in... loans in each of the following categories: (i) Real estate mortgage; (ii) real estate construction; (iii...

  16. Evaluation Report: ESEA Program of Compensatory Education (Including Abstract and Appendix).

    ERIC Educational Resources Information Center

    Badal, Alden W.

    This document is an evaluation of 1967-68 compensatory education programs in Oakland, California, funded by the Elementary and Secondary Education Act, Title I. It consists of three parts: (1) the evaluation report; (2) an appendix containing tables, questionnaire summaries, sample forms, etc.; and (3) an abstract of the total document. Reported…

  17. Communication Skills for Banking Report, April 1995.

    ERIC Educational Resources Information Center

    Fairfax County Public Schools, Falls Church, VA. Office of Adult and Community Education.

    This addendum to the curriculum and report consists of the appendixes to the report. The National Workplace Literacy Partnership (NWLP) Grant for banking employees was funded to improve the English language abilities of over 300 employees of 4 banking partners. Nine appendixes which make up about 90% of the publication include: class schedules;…

  18. 32 CFR Appendix B to Part 216 - ROTC Sample Letter of Inquiry

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION Pt. 216, App. B Appendix B to Part 216—ROTC Sample Letter of Inquiry (Tailor... obligated, (excluding any Federal funding to an institution of higher education, or to an individual, to be... Services, Education, and related agencies to institutions of higher education (including any subelements of...

  19. 32 CFR Appendix B to Part 216 - ROTC Sample Letter of Inquiry

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION Pt. 216, App. B Appendix B to Part 216—ROTC Sample Letter of Inquiry (Tailor... obligated, (excluding any Federal funding to an institution of higher education, or to an individual, to be... Services, Education, and related agencies to institutions of higher education (including any subelements of...

  20. 32 CFR Appendix B to Part 216 - ROTC Sample Letter of Inquiry

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION Pt. 216, App. B Appendix B to Part 216—ROTC Sample Letter of Inquiry (Tailor... obligated, (excluding any Federal funding to an institution of higher education, or to an individual, to be... Services, Education, and related agencies to institutions of higher education (including any subelements of...

Top