Sample records for process improvement projects

  1. The use of process mapping in healthcare quality improvement projects.

    PubMed

    Antonacci, Grazia; Reed, Julie E; Lennox, Laura; Barlow, James

    2018-05-01

    Introduction Process mapping provides insight into systems and processes in which improvement interventions are introduced and is seen as useful in healthcare quality improvement projects. There is little empirical evidence on the use of process mapping in healthcare practice. This study advances understanding of the benefits and success factors of process mapping within quality improvement projects. Methods Eight quality improvement projects were purposively selected from different healthcare settings within the UK's National Health Service. Data were gathered from multiple data-sources, including interviews exploring participants' experience of using process mapping in their projects and perceptions of benefits and challenges related to its use. These were analysed using inductive analysis. Results Eight key benefits related to process mapping use were reported by participants (gathering a shared understanding of the reality; identifying improvement opportunities; engaging stakeholders in the project; defining project's objectives; monitoring project progress; learning; increased empathy; simplicity of the method) and five factors related to successful process mapping exercises (simple and appropriate visual representation, information gathered from multiple stakeholders, facilitator's experience and soft skills, basic training, iterative use of process mapping throughout the project). Conclusions Findings highlight benefits and versatility of process mapping and provide practical suggestions to improve its use in practice.

  2. Generic project definitions for improvement of health care delivery: a case-based approach.

    PubMed

    Niemeijer, Gerard C; Does, Ronald J M M; de Mast, Jeroen; Trip, Albert; van den Heuvel, Jaap

    2011-01-01

    The purpose of this article is to create actionable knowledge, making the definition of process improvement projects in health care delivery more effective. This study is a retrospective analysis of process improvement projects in hospitals, facilitating a case-based reasoning approach to project definition. Data sources were project documentation and hospital-performance statistics of 271 Lean Six Sigma health care projects from 2002 to 2009 of general, teaching, and academic hospitals in the Netherlands and Belgium. Objectives and operational definitions of improvement projects in the sample, analyzed and structured in a uniform format and terminology. Extraction of reusable elements of earlier project definitions, presented in the form of 9 templates called generic project definitions. These templates function as exemplars for future process improvement projects, making the selection, definition, and operationalization of similar projects more efficient. Each template includes an explicated rationale, an operationalization in the form of metrics, and a prototypical example. Thus, a process of incremental and sustained learning based on case-based reasoning is facilitated. The quality of project definitions is a crucial success factor in pursuits to improve health care delivery. We offer 9 tried and tested improvement themes related to patient safety, patient satisfaction, and business-economic performance of hospitals.

  3. Building an outpatient imaging center: A case study at genesis healthcare system, part 2.

    PubMed

    Yanci, Jim

    2006-01-01

    In the second of 2 parts, this article will focus on process improvement projects utilizing a case study at Genesis HealthCare System located in Zanesville, OH. Operational efficiency is a key step in developing a freestanding diagnostic imaging center. The process improvement projects began with an Expert Improvement Session (EIS) on the scheduling process. An EIS session is a facilitated meeting that can last anywhere from 3 hours to 2 days. Its intention is to take a group of people involved with the problem or operational process and work to understand current failures or breakdowns in the process. Recommendations are jointly developed to overcome any current deficiencies, and a work plan is structured to create ownership over the changes. A total of 11 EIS sessions occurred over the course of this project, covering 5 sections: Scheduling/telephone call process, Pre-registration, Verification/pre-certification, MRI throughput, CT throughput. Following is a single example of a project focused on the process improvement efforts. All of the process improvement projects utilized a quasi methodology of "DMAIC" (Define, Measure, Analyze, Improve, and Control).

  4. How to conduct a clinical audit and quality improvement project.

    PubMed

    Limb, Christopher; Fowler, Alex; Gundogan, Buket; Koshy, Kiron; Agha, Riaz

    2017-07-01

    Audits and quality improvement projects are vital aspects of clinical governance and continual service improvement in medicine. In this article we describe the process of clinical audit and quality improvement project. Guidance is also provided on how to design an effective audit and bypass barriers encountered during the process.

  5. Strategy for 90% autoverification of clinical chemistry and immunoassay test results using six sigma process improvement.

    PubMed

    Randell, Edward W; Short, Garry; Lee, Natasha; Beresford, Allison; Spencer, Margaret; Kennell, Marina; Moores, Zoë; Parry, David

    2018-06-01

    Six Sigma involves a structured process improvement strategy that places processes on a pathway to continued improvement. The data presented here summarizes a project that took three clinical laboratories from autoverification processes that allowed between about 40% to 60% of tests being auto-verified to more than 90% of tests and samples auto-verified. The project schedule, metrics and targets, a description of the previous system and detailed information on the changes made to achieve greater than 90% auto-verification is presented for this Six Sigma DMAIC (Design, Measure, Analyze, Improve, Control) process improvement project.

  6. Quantitative CMMI Assessment for Offshoring through the Analysis of Project Management Repositories

    NASA Astrophysics Data System (ADS)

    Sunetnanta, Thanwadee; Nobprapai, Ni-On; Gotel, Olly

    The nature of distributed teams and the existence of multiple sites in offshore software development projects pose a challenging setting for software process improvement. Often, the improvement and appraisal of software processes is achieved through a turnkey solution where best practices are imposed or transferred from a company’s headquarters to its offshore units. In so doing, successful project health checks and monitoring for quality on software processes requires strong project management skills, well-built onshore-offshore coordination, and often needs regular onsite visits by software process improvement consultants from the headquarters’ team. This paper focuses on software process improvement as guided by the Capability Maturity Model Integration (CMMI) and proposes a model to evaluate the status of such improvement efforts in the context of distributed multi-site projects without some of this overhead. The paper discusses the application of quantitative CMMI assessment through the collection and analysis of project data gathered directly from project repositories to facilitate CMMI implementation and reduce the cost of such implementation for offshore-outsourced software development projects. We exemplify this approach to quantitative CMMI assessment through the analysis of project management data and discuss the future directions of this work in progress.

  7. The maturing of the quality improvement paradigm in the SEL

    NASA Technical Reports Server (NTRS)

    Basili, Victor R.

    1993-01-01

    The Software Engineering Laboratory uses a paradigm for improving the software process and product, called the quality improvement paradigm. This paradigm has evolved over the past 18 years, along with our software development processes and product. Since 1976, when we first began the SEL, we have learned a great deal about improving the software process and product, making a great many mistakes along the way. Quality improvement paradigm, as it is currently defined, can be broken up into six steps: characterize the current project and its environment with respect to the appropriate models and metrics; set the quantifiable goals for successful project performance and improvement; choose the appropriate process model and supporting methods and tools for this project; execute the processes, construct the products, and collect, validate, and analyze the data to provide real-time feedback for corrective action; analyze the data to evaluate the current practices, determine problems, record findings, and make recommendations for future project improvements; and package the experience gained in the form of updated and refined models and other forms of structured knowledge gained from this and prior projects and save it in an experience base to be reused on future projects.

  8. Improving Immunization Rates Using Lean Six Sigma Processes: Alliance of Independent Academic Medical Centers National Initiative III Project.

    PubMed

    Hina-Syeda, Hussaini; Kimbrough, Christina; Murdoch, William; Markova, Tsveti

    2013-01-01

    Quality improvement education and work in interdisciplinary teams is a healthcare priority. Healthcare systems are trying to meet core measures and provide excellent patient care, thus improving their Hospital Consumer Assessment of Healthcare Providers & Systems scores. Crittenton Hospital Medical Center in Rochester Hills, MI, aligned educational and clinical objectives, focusing on improving immunization rates against pneumonia and influenza prior to the rates being implemented as core measures. Improving immunization rates prevents infections, minimizes hospitalizations, and results in overall improved patient care. Teaching hospitals offer an effective way to work on clinical projects by bringing together the skill sets of residents, faculty, and hospital staff to achieve superior results. WE DESIGNED AND IMPLEMENTED A STRUCTURED CURRICULUM IN WHICH INTERDISCIPLINARY TEAMS ACQUIRED KNOWLEDGE ON QUALITY IMPROVEMENT AND TEAMWORK, WHILE FOCUSING ON A SPECIFIC CLINICAL PROJECT: improving global immunization rates. We used the Lean Six Sigma process tools to quantify the initial process capability to immunize against pneumococcus and influenza. The hospital's process to vaccinate against pneumonia overall was operating at a Z score of 3.13, and the influenza vaccination Z score was 2.53. However, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 1.96. Improvement in immunization rates of high-risk patients became the focus of the project. After the implementation of solutions, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 3.9 with a defects/million opportunities rate of 9,346 and a yield of 93.5%. Revisions to the adult assessment form fixed 80% of the problems identified. This process improvement project was not only beneficial in terms of improved quality of patient care but was also a positive learning experience for the interdisciplinary team, particularly for the residents. The hospital has completed quality improvement projects in the past; however, this project was the first in which residents were actively involved. The didactic components and experiential learning were powerfully synergistic. This and similar projects can have far-reaching implications in terms of promoting patient health and improving the quality of care delivered by the healthcare systems and teaching hospitals.

  9. Environmental Data Flow Six Sigma Process Improvement Savings Overview

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Paige, Karen S

    An overview of the Environmental Data Flow Six Sigma improvement project covers LANL’s environmental data processing following receipt from the analytical laboratories. The Six Sigma project identified thirty-three process improvements, many of which focused on cutting costs or reducing the time it took to deliver data to clients.

  10. [Improving the continuous care process in primary care during weekends and holidays: redesigning and FMEA].

    PubMed

    Cañada Dorado, A; Cárdenas Valladolid, J; Espejo Matorrales, F; García Ferradal, I; Sastre Páez, S; Vicente Martín, I

    2010-01-01

    To describe a project carried out in order to improve the process of Continuous Health Care (CHC) on Saturdays and bank holidays in Primary Care, area number 4, Madrid. The aim of this project was to guarantee a safe and error-free service to patients receiving home health care on weekends. The urgent need for improving CHC process was identified by the Risk Management Functional Unit (RMFU) of the area. In addition, some complaints had been received from the nurses involved in the process as well as from their patients. A SWOT (Strengths, Weaknesses, Opportunities and Threats) analysis performed in 2009 highlighted a number of problems with the process. As a result, a project for improvement was drawn up, to be implemented in the following stages: 1. Redesigning and improving the existing process. 2. Application of failure mode and effect analysis (FMEA) to the new process. 3. Follow up, managing and leading the project. 4. Nurse training. 5. Implementing the process in the whole area. 6. CHC nurse satisfaction surveys. After carrying out this project, the efficiency and level of automation improved considerably. Since implementation of the process enhancement measures, no complaints have been received from patients and surveys show that CHC nurse satisfaction has improved. By using FMEA, errors were given priority and enhancement steps were taken in order to: Inform professionals, back-up personnel and patients about the process. Improve the specialist follow-up report. Provide training in ulcer patient care. The process enhancement, and especially its automation, has resulted in a significant step forward toward achieving greater patient safety. FMEA was a useful tool, which helped in taking some important actions. Finally, CHC nurse satisfaction has clearly improved. Copyright © 2009 SECA. Published by Elsevier Espana. All rights reserved.

  11. Collaborative Project: Improving the Representation of Coastal and Estuarine Processes in Earth System Models

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bryan, Frank; Dennis, John; MacCready, Parker

    This project aimed to improve long term global climate simulations by resolving and enhancing the representation of the processes involved in the cycling of freshwater through estuaries and coastal regions. This was a collaborative multi-institution project consisting of physical oceanographers, climate model developers, and computational scientists. It specifically targeted the DOE objectives of advancing simulation and predictive capability of climate models through improvements in resolution and physical process representation.

  12. Final Report Collaborative Project: Improving the Representation of Coastal and Estuarine Processes in Earth System Models

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bryan, Frank; Dennis, John; MacCready, Parker

    This project aimed to improve long term global climate simulations by resolving and enhancing the representation of the processes involved in the cycling of freshwater through estuaries and coastal regions. This was a collaborative multi-institution project consisting of physical oceanographers, climate model developers, and computational scientists. It specifically targeted the DOE objectives of advancing simulation and predictive capability of climate models through improvements in resolution and physical process representation.

  13. Engaging Clinical Nurses in Quality Improvement Projects.

    PubMed

    Moore, Susan; Stichler, Jaynelle F

    2015-10-01

    Clinical nurses have the knowledge and expertise required to provide efficient and proficient patient care. Time and knowledge deficits can prevent nurses from developing and implementing quality improvement or evidence-based practice projects. This article reviews a process for professional development of clinical nurses that helped them to define, implement, and analyze quality improvement or evidence-based practice projects. The purpose of this project was to educate advanced clinical nurses to manage a change project from inception to completion, using the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) Change Acceleration Process as a framework. One-to-one mentoring and didactic in-services advanced the knowledge, appreciation, and practice of advanced practice clinicians who completed multiple change projects. The projects facilitated clinical practice changes, with improved patient outcomes; a unit cultural shift, with appreciation of quality improvement and evidence-based projects; and engagement with colleagues. Project outcomes were displayed in poster presentations at a hospital exposition for knowledge dissemination. Copyright 2015, SLACK Incorporated.

  14. Quality initiatives: planning, setting up, and carrying out radiology process improvement projects.

    PubMed

    Tamm, Eric P; Szklaruk, Janio; Puthooran, Leejo; Stone, Danna; Stevens, Brian L; Modaro, Cathy

    2012-01-01

    In the coming decades, those who provide radiologic imaging services will be increasingly challenged by the economic, demographic, and political forces affecting healthcare to improve their efficiency, enhance the value of their services, and achieve greater customer satisfaction. It is essential that radiologists master and consistently apply basic process improvement skills that have allowed professionals in many other fields to thrive in a competitive environment. The authors provide a step-by-step overview of process improvement from the perspective of a radiologic imaging practice by describing their experience in conducting a process improvement project: to increase the daily volume of body magnetic resonance imaging examinations performed at their institution. The first step in any process improvement project is to identify and prioritize opportunities for improvement in the work process. Next, an effective project team must be formed that includes representatives of all participants in the process. An achievable aim must be formulated, appropriate measures selected, and baseline data collected to determine the effects of subsequent efforts to achieve the aim. Each aspect of the process in question is then analyzed by using appropriate tools (eg, flowcharts, fishbone diagrams, Pareto diagrams) to identify opportunities for beneficial change. Plans for change are then established and implemented with regular measurements and review followed by necessary adjustments in course. These so-called PDSA (planning, doing, studying, and acting) cycles are repeated until the aim is achieved or modified and the project closed.

  15. Improving Immunization Rates Using Lean Six Sigma Processes: Alliance of Independent Academic Medical Centers National Initiative III Project

    PubMed Central

    Hina-Syeda, Hussaini; Kimbrough, Christina; Murdoch, William; Markova, Tsveti

    2013-01-01

    Background Quality improvement education and work in interdisciplinary teams is a healthcare priority. Healthcare systems are trying to meet core measures and provide excellent patient care, thus improving their Hospital Consumer Assessment of Healthcare Providers & Systems scores. Crittenton Hospital Medical Center in Rochester Hills, MI, aligned educational and clinical objectives, focusing on improving immunization rates against pneumonia and influenza prior to the rates being implemented as core measures. Improving immunization rates prevents infections, minimizes hospitalizations, and results in overall improved patient care. Teaching hospitals offer an effective way to work on clinical projects by bringing together the skill sets of residents, faculty, and hospital staff to achieve superior results. Methods We designed and implemented a structured curriculum in which interdisciplinary teams acquired knowledge on quality improvement and teamwork, while focusing on a specific clinical project: improving global immunization rates. We used the Lean Six Sigma process tools to quantify the initial process capability to immunize against pneumococcus and influenza. Results The hospital's process to vaccinate against pneumonia overall was operating at a Z score of 3.13, and the influenza vaccination Z score was 2.53. However, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 1.96. Improvement in immunization rates of high-risk patients became the focus of the project. After the implementation of solutions, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 3.9 with a defects/million opportunities rate of 9,346 and a yield of 93.5%. Revisions to the adult assessment form fixed 80% of the problems identified. Conclusions This process improvement project was not only beneficial in terms of improved quality of patient care but was also a positive learning experience for the interdisciplinary team, particularly for the residents. The hospital has completed quality improvement projects in the past; however, this project was the first in which residents were actively involved. The didactic components and experiential learning were powerfully synergistic. This and similar projects can have far-reaching implications in terms of promoting patient health and improving the quality of care delivered by the healthcare systems and teaching hospitals. PMID:24052758

  16. Improving Initiation and Tracking of Research Projects at an Academic Health Center: A Case Study.

    PubMed

    Schmidt, Susanne; Goros, Martin; Parsons, Helen M; Saygin, Can; Wan, Hung-Da; Shireman, Paula K; Gelfond, Jonathan A L

    2017-09-01

    Research service cores at academic health centers are important in driving translational advancements. Specifically, biostatistics and research design units provide services and training in data analytics, biostatistics, and study design. However, the increasing demand and complexity of assigning appropriate personnel to time-sensitive projects strains existing resources, potentially decreasing productivity and increasing costs. Improving processes for project initiation, assigning appropriate personnel, and tracking time-sensitive projects can eliminate bottlenecks and utilize resources more efficiently. In this case study, we describe our application of lean six sigma principles to our biostatistics unit to establish a systematic continual process improvement cycle for intake, allocation, and tracking of research design and data analysis projects. The define, measure, analyze, improve, and control methodology was used to guide the process improvement. Our goal was to assess and improve the efficiency and effectiveness of operations by objectively measuring outcomes, automating processes, and reducing bottlenecks. As a result, we developed a web-based dashboard application to capture, track, categorize, streamline, and automate project flow. Our workflow system resulted in improved transparency, efficiency, and workload allocation. Using the dashboard application, we reduced the average study intake time from 18 to 6 days, a 66.7% reduction over 12 months (January to December 2015).

  17. Performance excellence: using Lean Six Sigma tools to improve the US Army behavioral health surveillance process, boost team morale, and maximize value to customers and stakeholders.

    PubMed

    Watkins, Eren Youmans; Kemeter, Dave M; Spiess, Anita; Corrigan, Elizabeth; Kateley, Keri; Wills, John V; Mancha, Brent Edward; Nichols, Jerrica; Bell, Amy Millikan

    2014-01-01

    Lean Six Sigma (LSS) is a process improvement, problem-solving methodology used in business and manufacturing to improve the speed, quality, and cost of products. LSS can also be used to improve knowledge-based products integral to public health surveillance. An LSS project by the Behavioral Social Health Outcomes Program of the Army Institute of Public Health reduced the number of labor hours spent producing the routine surveillance of suicidal behavior publication. At baseline, the total number of labor hours was 448; after project completion, total labor hours were 199. Based on customer feedback, publication production was reduced from quarterly to annually. Process improvements enhanced group morale and established best practices in the form of standard operating procedures and business rules to ensure solutions are sustained. LSS project participation also fostered a change in the conceptualization of tasks and projects. These results demonstrate that LSS can be used to inform the public health process and should be considered a viable method of improving knowledge-based products and processes.

  18. The evolution of a doctor of nursing practice capstone process: programmatic revisions to improve the quality of student projects.

    PubMed

    Nelson, Joan M; Cook, Paul F; Raterink, Ginger

    2013-01-01

    The past several years have seen explosive growth in the number of doctor of nursing practice (DNP) degree programs offered by colleges of nursing in the United States. Through a process of trial and error since 2005, the faculty at the University of Colorado, College of Nursing, have revised the course structure and procedures related to the DNP capstone project to improve the quality and usefulness of these student projects. Efforts have focused on educating and involving all nursing faculty in the DNP capstone process, distinguishing between competencies for our PhD and DNP projects, clearly aligning the DNP capstone project with quality improvement methods rather than with research, working with our campus institutional review board to clarify regulatory review requirements for quality improvement studies, developing a review committee to oversee DNP students' projects, and structuring our sequential course requirements to encourage students' professional presentations and publications. Our current capstone process reflects 7 years of iterative work, which we summarize in this article in hopes that it will help institutions currently in the process of developing a DNP program. Copyright © 2013 Elsevier Inc. All rights reserved.

  19. Improving flow in the OR.

    PubMed

    Blouin-Delisle, Charles Hubert; Drolet, Renee; Gagnon, Serge; Turcotte, Stephane; Boutet, Sylvie; Coulombe, Martin; Daneau, Eric

    2018-03-12

    Purpose The purpose of this paper is to increase efficiency in ORs without affecting quality of care by improving the workflow processes. Administrative processes independent of the surgical act can be challenging and may lead to clinical impacts such as increasing delays. The authors hypothesized that a Lean project could improve efficiency of surgical processes by reducing the length of stays in the recovery ward. Design/methodology/approach Two similar Lean projects were performed in the surgery departments of two hospitals of the Centre Hospitalier Universitaire de Québec: Hôtel Dieu de Quebec (HDQ) and Hôpital de l'Enfant Jesus (HEJ). The HDQ project designed around a Define, Measure, Analyse, Improve and Control process revision and a Kaizen workshop focused on patients who were hospitalized in a specific care unit after surgery and the HEJ project targeted patients in a post-operative ambulatory context. The recovery ward output delay was measured retrospectively before and after project. Findings For the HDQ Lean project, wasted time in the recovery ward was reduced by 62 minutes (68 percent reduction) between the two groups. The authors also observed an increase of about 25 percent of all admissions made in the daytime after the project compared to the time period before the project. For the HEJ Lean project, time passed in the recovery ward was reduced by 6 min (29 percent reduction). Originality/value These projects produced an improvement in the flow of the OR without targeting clinical practices in the OR itself. They demonstrated that change in administrative processes can have a great impact on the flow of clinical pathways and highlight the need for comprehensive and precise monitoring of every step of the elective surgery patient trajectory.

  20. Information Technology Project Processes: Understanding the Barriers to Improvement and Adoption

    ERIC Educational Resources Information Center

    Williams, Bernard L.

    2009-01-01

    Every year, organizations lose millions of dollars due to IT (Information Technology) project failures. Over time, organizations have developed processes and procedures to help reduce the incidence of challenged IT projects. Research has shown that IT project processes can work to help reduce the number of challenged projects. The research in this…

  1. EMPRESS: A European Project to Enhance Process Control Through Improved Temperature Measurement

    NASA Astrophysics Data System (ADS)

    Pearce, J. V.; Edler, F.; Elliott, C. J.; Rosso, L.; Sutton, G.; Andreu, A.; Machin, G.

    2017-08-01

    A new European project called EMPRESS, funded by the EURAMET program `European Metrology Program for Innovation and Research,' is described. The 3 year project, which started in the summer of 2015, is intended to substantially augment the efficiency of high-value manufacturing processes by improving temperature measurement techniques at the point of use. The project consortium has 18 partners and 5 external collaborators, from the metrology sector, high-value manufacturing, sensor manufacturing, and academia. Accurate control of temperature is key to ensuring process efficiency and product consistency and is often not achieved to the level required for modern processes. Enhanced efficiency of processes may take several forms including reduced product rejection/waste; improved energy efficiency; increased intervals between sensor recalibration/maintenance; and increased sensor reliability, i.e., reduced amount of operator intervention. Traceability of temperature measurements to the International Temperature Scale of 1990 (ITS-90) is a critical factor in establishing low measurement uncertainty and reproducible, consistent process control. Introducing such traceability in situ (i.e., within the industrial process) is a theme running through this project.

  2. SEL's Software Process-Improvement Program

    NASA Technical Reports Server (NTRS)

    Basili, Victor; Zelkowitz, Marvin; McGarry, Frank; Page, Jerry; Waligora, Sharon; Pajerski, Rose

    1995-01-01

    The goals and operations of the Software Engineering Laboratory (SEL) is reviewed. For nearly 20 years the SEL has worked to understand, assess, and improve software and the development process within the production environment of the Flight Dynamics Division (FDD) of NASA's Goddard Space Flight Center. The SEL was established in 1976 with the goals of reducing: (1) the defect rate of delivered software, (2) the cost of software to support flight projects, and (3) the average time to produce mission-support software. After studying over 125 projects of FDD, the results have guided the standards, management practices, technologies, and the training within the division. The results of the studies have been a 75 percent reduction in defects, a 50 percent reduction in cost, and a 25 percent reduction in development time. Over time the goals of SEL have been clarified. The goals are now stated as: (1) Understand baseline processes and product characteristics, (2) Assess improvements that have been incorporated into the development projects, (3) Package and infuse improvements into the standard SEL process. The SEL improvement goal is to demonstrate continual improvement of the software process by carrying out analysis, measurement and feedback to projects with in the FDD environment. The SEL supports the understanding of the process by study of several processes including, the effort distribution, and error detection rates. The SEL assesses and refines the processes. Once the assessment and refinement of a process is completed, the SEL packages the process by capturing the process in standards, tools and training.

  3. Selecting Health Care Improvement Projects: A Methodology Integrating Cause-and-Effect Diagram and Analytical Hierarchy Process.

    PubMed

    Testik, Özlem Müge; Shaygan, Amir; Dasdemir, Erdi; Soydan, Guray

    It is often vital to identify, prioritize, and select quality improvement projects in a hospital. Yet, a methodology, which utilizes experts' opinions with different points of view, is needed for better decision making. The proposed methodology utilizes the cause-and-effect diagram to identify improvement projects and construct a project hierarchy for a problem. The right improvement projects are then prioritized and selected using a weighting scheme of analytical hierarchy process by aggregating experts' opinions. An approach for collecting data from experts and a graphical display for summarizing the obtained information are also provided. The methodology is implemented for improving a hospital appointment system. The top-ranked 2 major project categories for improvements were identified to be system- and accessibility-related causes (45%) and capacity-related causes (28%), respectively. For each of the major project category, subprojects were then ranked for selecting the improvement needs. The methodology is useful in cases where an aggregate decision based on experts' opinions is expected. Some suggestions for practical implementations are provided.

  4. WISE: Automated support for software project management and measurement. M.S. Thesis

    NASA Technical Reports Server (NTRS)

    Ramakrishnan, Sudhakar

    1995-01-01

    One important aspect of software development and IV&V is measurement. Unless a software development effort is measured in some way, it is difficult to judge the effectiveness of current efforts and predict future performances. Collection of metrics and adherence to a process are difficult tasks in a software project. Change activity is a powerful indicator of project status. Automated systems that can handle change requests, issues, and other process documents provide an excellent platform for tracking the status of the project. A World Wide Web based architecture is developed for (a) making metrics collection an implicit part of the software process, (b) providing metric analysis dynamically, (c) supporting automated tools that can complement current practices of in-process improvement, and (d) overcoming geographical barrier. An operational system (WISE) instantiates this architecture allowing for the improvement of software process in a realistic environment. The tool tracks issues in software development process, provides informal communication between the users with different roles, supports to-do lists (TDL), and helps in software process improvement. WISE minimizes the time devoted to metrics collection, analysis, and captures software change data. Automated tools like WISE focus on understanding and managing the software process. The goal is improvement through measurement.

  5. Using Lean Six Sigma Methodology to Improve a Mass Immunizations Process at the United States Naval Academy.

    PubMed

    Ha, Chrysanthy; McCoy, Donald A; Taylor, Christopher B; Kirk, Kayla D; Fry, Robert S; Modi, Jitendrakumar R

    2016-06-01

    Lean Six Sigma (LSS) is a process improvement methodology developed in the manufacturing industry to increase process efficiency while maintaining product quality. The efficacy of LSS application to the health care setting has not been adequately studied. This article presents a quality improvement project at the U.S. Naval Academy that uses LSS to improve the mass immunizations process for Midshipmen during in-processing. The process was standardized to give all vaccinations at one station instead of giving a different vaccination at each station. After project implementation, the average immunizations lead time decreased by 79% and staffing decreased by 10%. The process was shown to be in control with a capability index of 1.18 and performance index of 1.10, resulting in a defect rate of 0.04%. This project demonstrates that the LSS methodology can be applied successfully to the health care setting to make sustainable process improvements if used correctly and completely. Reprint & Copyright © 2016 Association of Military Surgeons of the U.S.

  6. Ninety to Nothing: a PDSA quality improvement project.

    PubMed

    Prybutok, Gayle Linda

    2018-05-14

    Purpose The purpose of this paper is to present a case study of a successful quality improvement project in an acute care hospital focused on reducing the time of the total patient visit in the emergency department. Design/methodology/approach A multidisciplinary quality improvement team, using the PDSA (Plan, Do, Study, Act) Cycle, analyzed the emergency department care delivery process and sequentially made process improvements that contributed to project success. Findings The average turnaround time goal of 90 minutes or less per visit was achieved in four months, and the organization enjoyed significant collateral benefits both internal to the organization and for its customers. Practical implications This successful PDSA process can be duplicated by healthcare organizations of all sizes seeking to improve a process related to timely, high-quality patient care delivery. Originality/value Extended wait time in hospital emergency departments is a universal problem in the USA that reduces the quality of the customer experience and that delays necessary patient care. This case study demonstrates that a structured quality improvement process implemented by a multidisciplinary team with the authority to make necessary process changes can successfully redefine the norm.

  7. Using Group Projects to Teach Process Improvement in a Quality Class

    ERIC Educational Resources Information Center

    Neidigh, Robert O.

    2016-01-01

    This paper provides a description of a teaching approach that uses experiential learning to teach process improvement. The teaching approach uses student groups to perform and gather process data in a senior-level quality management class that focuses on Lean Six Sigma. A strategy to link the experiential learning in the group projects to the…

  8. A Prototype for the Support of Integrated Software Process Development and Improvement

    NASA Astrophysics Data System (ADS)

    Porrawatpreyakorn, Nalinpat; Quirchmayr, Gerald; Chutimaskul, Wichian

    An efficient software development process is one of key success factors for quality software. Not only can the appropriate establishment but also the continuous improvement of integrated project management and of the software development process result in efficiency. This paper hence proposes a software process maintenance framework which consists of two core components: an integrated PMBOK-Scrum model describing how to establish a comprehensive set of project management and software engineering processes and a software development maturity model advocating software process improvement. Besides, a prototype tool to support the framework is introduced.

  9. Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success

    DTIC Science & Technology

    2009-09-01

    comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project...Milestone Documentation, Project Planning, Rational Frame, Political Frame, CMMI Project Planning Process Area, CMMI Risk Management Process Area...well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project Planning and Risk Management process areas. The intent is to

  10. Improving transition of care for veterans after total joint replacement.

    PubMed

    Green, Uthona R; Dearmon, Valorie; Taggart, Helen

    2015-01-01

    Patients transitioning from hospital to home are at risk for readmission to the hospital. Readmissions are costly and occur too often. Standardized discharge education processes have shown to decrease readmissions. The purpose of this quality improvement project was to utilize evidence-based practice changes to decrease 30-day all-cause readmissions after total joint replacement. Review of literature revealed that improved discharge education can decrease unnecessary readmissions after discharge. A quality improvement project was developed including standardized total joint replacement discharge education, teach-back education methodology, and improved postdischarge telephone follow-up. The quality improvement project was initiated and outcomes were evaluated. Improving coordination of the discharge process, enhanced education for patients/caregivers, and postdischarge follow-up decreased total joint replacement readmissions.

  11. Combining Project Management Methods: A Case Study of Dlstributed Work Practices

    NASA Astrophysics Data System (ADS)

    Backlund, Per; Lundell, Björn

    The increasing complexity of information systems development (ISD) projects call for improved project management practices. This, together with an endeavour to improve the success rate of ISD projects (Lyytinen and Robey 1999; Cooke-Davies 2002; White and Fortune 2002), has served as drivers for various efforts in process improvement such as the introduction of new development methods (Fitzgerald 1997; Iivari and Maansaari 1998).

  12. Integrated Modeling and Analysis of Physical Oceanographic and Acoustic Processes

    DTIC Science & Technology

    2015-09-30

    goal is to improve ocean physical state and acoustic state predictive capabilities. The goal fitting the scope of this project is the creation of... Project -scale objectives are to complete targeted studies of oceanographic processes in a few regimes, accompanied by studies of acoustic propagation...by the basic research efforts of this project . An additional objective is to develop improved computational tools for acoustics and for the

  13. Improving patient care through student leadership in team quality improvement projects.

    PubMed

    Tschannen, Dana; Aebersold, Michelle; Kocan, Mary Jo; Lundy, Francene; Potempa, Kathleen

    2015-01-01

    In partnership with a major medical center, senior-level nursing students completed a root cause analysis and implementation plan to address a unit-specific quality issue. To evaluate the project, unit leaders were asked their perceptions of the value of the projects and impact on patient care, as well as to provide exemplars depicting how the student root cause analysis work resulted in improved patient outcome and/or unit processes. Liaisons noted benefits of having an RCA team, with positive impact on patient outcomes and care processes.

  14. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship

    PubMed Central

    Ford, Bradley A.; Klutts, J. Stacey; Jensen, Chris S.; Briggs, Angela S.; Robinson, Robert A.; Bruch, Leslie A.; Karandikar, Nitin J.

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output. PMID:28913416

  15. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship.

    PubMed

    Krasowski, Matthew D; Ford, Bradley A; Klutts, J Stacey; Jensen, Chris S; Briggs, Angela S; Robinson, Robert A; Bruch, Leslie A; Karandikar, Nitin J

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output.

  16. An expert panel process to evaluate habitat restoration actions in the Columbia River estuary.

    PubMed

    Krueger, Kirk L; Bottom, Daniel L; Hood, W Gregory; Johnson, Gary E; Jones, Kim K; Thom, Ronald M

    2017-03-01

    We describe a process for evaluating proposed ecosystem restoration projects intended to improve survival of juvenile salmon in the Columbia River estuary (CRE). Changes in the Columbia River basin (northwestern USA), including hydropower development, have contributed to the listing of 13 salmon stocks as endangered or threatened under the U.S. Endangered Species Act. Habitat restoration in the CRE, from Bonneville Dam to the ocean, is part of a basin-wide, legally mandated effort to mitigate federal hydropower impacts on salmon survival. An Expert Regional Technical Group (ERTG) was established in 2009 to improve and implement a process for assessing and assigning "survival benefit units" (SBUs) to restoration actions. The SBU concept assumes site-specific restoration projects will increase juvenile salmon survival during migration through the 234 km CRE. Assigned SBUs are used to inform selection of restoration projects and gauge mitigation progress. The ERTG standardized the SBU assessment process to improve its scientific integrity, repeatability, and transparency. In lieu of experimental data to quantify the survival benefits of individual restoration actions, the ERTG adopted a conceptual model composed of three assessment criteria-certainty of success, fish opportunity improvements, and habitat capacity improvements-to evaluate restoration projects. Based on these criteria, an algorithm assigned SBUs by integrating potential fish density as an indicator of salmon performance. Between 2009 and 2014, the ERTG assessed SBUs for 55 proposed projects involving a total of 181 restoration actions located across 8 of 9 reaches of the CRE, largely relying on information provided in a project template based on the conceptual model, presentations, discussions with project sponsors, and site visits. Most projects restored tidal inundation to emergent wetlands, improved riparian function, and removed invasive vegetation. The scientific relationship of geomorphic and salmonid responses to restoration actions remains the foremost concern. Although not designed to establish a broad strategy for estuary restoration, the scoring process has adaptively influenced the types, designs, and locations of restoration proposals. The ERTG process may be a useful model for others who have unique ecosystem restoration goals and share some of our common challenges. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Using guided inquiry and the information search process to develop research confidence among first year anatomy students.

    PubMed

    Bentley, Danielle Christine; Robinson, Andrea Cristina; Ruscitti, Robert Joseph

    2015-01-01

    With the growing volume of obtainable medical information and scientific literature, it is crucial that students in the field of allied health professions develop and refine the research skill set necessary to effectively find, retrieve, analyze, and use this information. This skill set can be effectively developed using student inquiry; an active learning process where students answer questions using research and data analysis. Therefore, with the pedagogical goal of developing information literacy among a cohort of allied health professional trainees, first year students studying human anatomy completed inquiry-based projects that were structured within the framework of the Information Search Process. This article thoroughly describes the conceptualization, creation, improvement, implementation, and assessment of the projects beginning with version one, the Student Inquiry Projects. Following a pilot of the Student Inquiry Projects various evidence-based improvements resulted in the final project version called the Inquiry Guided Learning Projects (IGLPs). A full assessment of the IGLPs revealed that students' self-perceived confidence improved for all tested research skills including: research question development, research question selection, exploration of peer-review literature, acquisition of resources, effective communication of results, and literature citation (all P < 0.05). Furthermore, six months following project completion students retained improved confidence in research question development and effective communication of results, with 90% of students indicating the IGLPs were directly responsible for these improvements. By guiding students through the Information Search Process, the IGLPs successfully developed research confidence among allied health trainees. © 2015 American Association of Anatomists.

  18. The TAME Project: Towards improvement-oriented software environments

    NASA Technical Reports Server (NTRS)

    Basili, Victor R.; Rombach, H. Dieter

    1988-01-01

    Experience from a dozen years of analyzing software engineering processes and products is summarized as a set of software engineering and measurement principles that argue for software engineering process models that integrate sound planning and analysis into the construction process. In the TAME (Tailoring A Measurement Environment) project at the University of Maryland, such an improvement-oriented software engineering process model was developed that uses the goal/question/metric paradigm to integrate the constructive and analytic aspects of software development. The model provides a mechanism for formalizing the characterization and planning tasks, controlling and improving projects based on quantitative analysis, learning in a deeper and more systematic way about the software process and product, and feeding the appropriate experience back into the current and future projects. The TAME system is an instantiation of the TAME software engineering process model as an ISEE (integrated software engineering environment). The first in a series of TAME system prototypes has been developed. An assessment of experience with this first limited prototype is presented including a reassessment of its initial architecture.

  19. Student Team Projects in Information Systems Development: Measuring Collective Creative Efficacy

    ERIC Educational Resources Information Center

    Cheng, Hsiu-Hua; Yang, Heng-Li

    2011-01-01

    For information systems development project student teams, learning how to improve software development processes is an important training. Software process improvement is an outcome of a number of creative behaviours. Social cognitive theory states that the efficacy of judgment influences behaviours. This study explores the impact of three types…

  20. Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May 19, 1998.

    ERIC Educational Resources Information Center

    Alaska State Dept. of Education, Juneau.

    This workshop addresses the application process for capital improvement funding from the state, e.g., who should apply, applicant eligibility and evaluation criteria, the types of funding available, and project specifics to be included in application submissions. The evaluation and scoring process of applications is explained followed by the…

  1. Accelerating Project and Process Improvement using Advanced Software Simulation Technology: From the Office to the Enterprise

    DTIC Science & Technology

    2010-04-29

    Technology: From the Office Larry Smith Software Technology Support Center to the Enterprise 517 SMXS/MXDEA 6022 Fir Avenue Hill AFB, UT 84056 801...2010 to 00-00-2010 4. TITLE AND SUBTITLE Accelerating Project and Process Improvement using Advanced Software Simulation Technology: From the Office to

  2. Implementing Six Sigma in The Netherlands.

    PubMed

    van den Heuvel, Jaap; Does, Ronald J M M; Bogers, Ad J J C; Berg, Marc

    2006-07-01

    Six Sigma, a process-focused strategy and methodology for business improvement, can be used to improve care processes, eliminate waste, reduce costs, and enhance patient satisfaction. Six Sigma was introduced in 2001 at the 384-bed Red Cross Hospital (Beverwijk). During the Green Belt training, every participant was required to participate in at least one Six Sigma project. The hospital's total savings in 2004 amounted to 1.4 million dollars, for an average savings of 67,000 dollars for each of the completed 21 projects. In one project, the team designed a new admission process for the operating rooms, resulting in an average starting time nine minutes earlier. This relatively minor improvement made it possible to operate on an additional 400 patients a year and to achieve a net savings of >273,000 dollars. A second project reduced the number of patients receiving intravenous (IV) antibiotics by switching to oral administration, yielding annual savings, based on medication costs alone, of >75,000 dollars. A third project reduced the length of stay in the delivery room from 11.9 to 3.4 hours, yielding an annual savings of 68,000 dollars. The "Ultimate Cure?": Six Sigma, which entails involvement of health care workers; use of improvement tools (from industry); creation of trained project teams to tackle complex, often cross-departmental processes; data analyses; and investment in quality improvement may prove the "ultimate cure" to the current cost, quality, and safety issues that challenge health care.

  3. Reducing RN Vacancy Rate: A Nursing Recruitment Office Process Improvement Project.

    PubMed

    Hisgen, Stephanie A; Page, Nancy E; Thornlow, Deirdre K; Merwin, Elizabeth I

    2018-06-01

    The aim of this study was to reduce the RN vacancy rate at an academic medical center by improving the hiring process in the Nursing Recruitment Office. Inability to fill RN positions can lead to higher vacancy rates and negatively impact staff and patient satisfaction, quality outcomes, and the organization's bottom line. The Model for Improvement was used to design and implement a process improvement project to improve the hiring process from time of interview through the position being filled. Number of days to interview and check references decreased significantly, but no change in overall time to hire and time to fill positions was noted. RN vacancy rate also decreased significantly. Nurse manager satisfaction with the hiring process increased significantly. Redesigning the recruitment process supported operational efficiencies of the organization related to RN recruitment.

  4. Ethnographic process evaluation of a quality improvement project to improve transitions of care for older people

    PubMed Central

    Sutton, Elizabeth; Dixon-Woods, Mary; Tarrant, Carolyn

    2016-01-01

    Objectives Quality improvement projects to address transitions of care across care boundaries are increasingly common but meet with mixed success for reasons that are poorly understood. We aimed to characterise challenges in a project to improve transitions for older people between hospital and care homes. Design Independent process evaluation, using ethnographic observations and interviews, of a quality improvement project. Setting and participants An English hospital and two residential care homes for older people. Data 32 hours of non-participant observations and 12 semistructured interviews with project members, hospital and care home staff. Results A hospital-based improvement team sought to reduce unplanned readmissions from residential care homes using interventions including a community-based geriatric team that could be accessed directly by care homes and a communication tool intended to facilitate transfer of information between homes and hospital. Only very modest (if any) impacts of these interventions on readmission rates could be detected. The process evaluation identified multiple challenges in implementing interventions and securing improvement. Many of these arose because of lack of consensus on the nature of the problem and the proper solutions: while the hospital team was keen to reduce readmissions and saw the problems as lying in poor communication and lack of community-based support for care homes, the care home staff had different priorities. Care home staff were unconvinced that the improvement interventions were aligned with their needs or addressed their concerns, resulting in compromised implementation. Conclusions Process evaluations have a valuable role in quality improvement. Our study suggests that a key task for quality improvement projects aimed at transitions of care is that of developing a shared view of the problem to be addressed. A more participatory approach could help to surface assumptions, interpretations and interests and could facilitate the coproduction of solutions. This finding is likely to have broader applicability. PMID:27491666

  5. Deployment of lean six sigma in care coordination: an improved discharge process.

    PubMed

    Breslin, Susan Ellen; Hamilton, Karen Marie; Paynter, Jacquelyn

    2014-01-01

    This article presents a quality improvement project to reduce readmissions in the Medicare population related to heart failure, acute myocardial infarction, and pneumonia. The article describes a systematic approach to the discharge process aimed at improving transitions of care from hospital to post-acute care, utilizing Lean Six Sigma methodology. Inpatient acute care hospital. A coordinated discharge process, which includes postdischarge follow-up, can reduce avoidable readmissions. Implications for The quality improvement project demonstrated the significant role case management plays in preventing costly readmissions and improving outcomes for patients through better transitions of care from the hospital to the community. By utilizing Lean Six Sigma methodology, hospitals can focus on eliminating waste in their current processes and build more sustainable improvements to deliver a safe, quality, discharge process for their patients. Case managers are leading this effort to improve care transitions and assure a smoother transition into the community postdischarge..

  6. Distributed Wind Competitiveness Improvement Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. Manufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. Thismore » fact sheet describes the CIP and funding awarded as part of the project.ufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. This fact sheet describes the CIP and funding awarded as part of the project.« less

  7. Applying Lean Six Sigma to improve medication management.

    PubMed

    Nayar, Preethy; Ojha, Diptee; Fetrick, Ann; Nguyen, Anh T

    2016-01-01

    A significant proportion of veterans use dual care or health care services within and outside the Veterans Health Administration (VHA). In this study conducted at a VHA medical center in the USA, the authors used Lean Six Sigma principles to develop recommendations to eliminate wasteful processes and implement a more efficient and effective process to manage medications for dual care veteran patients. The purpose of this study is to: assess compliance with the VHA's dual care policy; collect data and describe the current process for co-management of dual care veterans' medications; and draft recommendations to improve the current process for dual care medications co-management. Input was obtained from the VHA patient care team members to draw a process map to describe the current process for filling a non-VHA prescription at a VHA facility. Data were collected through surveys and direct observation to measure the current process and to develop recommendations to redesign and improve the process. A key bottleneck in the process that was identified was the receipt of the non-VHA medical record which resulted in delays in filling prescriptions. The recommendations of this project focus on the four domains of: documentation of dual care; veteran education; process redesign; and outreach to community providers. This case study describes the application of Lean Six Sigma principles in one urban Veterans Affairs Medical Center (VAMC) in the Mid-Western USA to solve a specific organizational quality problem. Therefore, the findings may not be generalizable to other organizations. The Lean Six Sigma general principles applied in this project to develop recommendations to improve medication management for dual care veterans are applicable to any process improvement or redesign project and has valuable lessons for other VAMCs seeking to improve care for their dual care veteran patients. The findings of this project will be of value to VA providers and policy makers and health care managers who plan to apply Lean Six Sigma techniques in their organizations to improve the quality of care for their patients.

  8. Grey Comprehensive Evaluation of Biomass Power Generation Project Based on Group Judgement

    NASA Astrophysics Data System (ADS)

    Xia, Huicong; Niu, Dongxiao

    2017-06-01

    The comprehensive evaluation of benefit is an important task needed to be carried out at all stages of biomass power generation projects. This paper proposed an improved grey comprehensive evaluation method based on triangle whiten function. To improve the objectivity of weight calculation result of only reference comparison judgment method, this paper introduced group judgment to the weighting process. In the process of grey comprehensive evaluation, this paper invited a number of experts to estimate the benefit level of projects, and optimized the basic estimations based on the minimum variance principle to improve the accuracy of evaluation result. Taking a biomass power generation project as an example, the grey comprehensive evaluation result showed that the benefit level of this project was good. This example demonstrates the feasibility of grey comprehensive evaluation method based on group judgment for benefit evaluation of biomass power generation project.

  9. Advanced Hydrogen Liquefaction Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwartz, Joseph; Kromer, Brian; Neu, Ben

    2011-09-28

    The project identified and quantified ways to reduce the cost of hydrogen liquefaction, and reduce the cost of hydrogen distribution. The goal was to reduce the power consumption by 20% and then to reduce the capital cost. Optimizing the process, improving process equipment, and improving ortho-para conversion significantly reduced the power consumption of liquefaction, but by less than 20%. Because the efficiency improvement was less than the target, the program was stopped before the capital cost was addressed. These efficiency improvements could provide a benefit to the public to improve the design of future hydrogen liquefiers. The project increased themore » understanding of hydrogen liquefaction by modeling different processes and thoroughly examining ortho-para separation and conversion. The process modeling provided a benefit to the public because the project incorporated para hydrogen into the process modeling software, so liquefaction processes can be modeled more accurately than using only normal hydrogen. Adding catalyst to the first heat exchanger, a simple method to reduce liquefaction power, was identified, analyzed, and quantified. The demonstrated performance of ortho-para separation is sufficient for at least one identified process concept to show reduced power cost when compared to hydrogen liquefaction processes using conventional ortho-para conversion. The impact of improved ortho-para conversion can be significant because ortho para conversion uses about 20-25% of the total liquefaction power, but performance improvement is necessary to realize a substantial benefit. Most of the energy used in liquefaction is for gas compression. Improvements in hydrogen compression will have a significant impact on overall liquefier efficiency. Improvements to turbines, heat exchangers, and other process equipment will have less impact.« less

  10. A Lean Six Sigma quality improvement project to increase discharge paperwork completeness for admission to a comprehensive integrated inpatient rehabilitation program.

    PubMed

    Neufeld, Nathan J; Hoyer, Erik H; Cabahug, Philippines; González-Fernández, Marlís; Mehta, Megha; Walker, N Colbey; Powers, Richard L; Mayer, R Samuel

    2013-01-01

    Lean Six Sigma (LSS) process analysis can be used to increase completeness of discharge summary reports used as a critical communication tool when a patient transitions between levels of care. The authors used the LSS methodology as an intervention to improve systems process. Over the course of the project, 8 required elements were analyzed in the discharge paperwork. The authors analyzed the discharge paperwork of patients (42 patients preintervention and 143 patients postintervention) of a comprehensive integrated inpatient rehabilitation program (CIIRP). Prior to this LSS project, 61.8% of required discharge elements were present. The intervention improved the completeness to 94.2% of the required elements. The percentage of charts that were 100% complete increased from 11.9% to 67.8%. LSS is a well-established process improvement methodology that can be used to make significant improvements in complex health care workflow issues. Specifically, the completeness of discharge documentation required for transition of care to CIIRP can be improved.

  11. Reengineering the project design process

    NASA Astrophysics Data System (ADS)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  12. A Project Management Approach to an ACPE Accreditation Self-study

    PubMed Central

    Iwanowicz, Susan L.; Bailie, George R.; Clarke, David W.; McGraw, Patrick S.

    2007-01-01

    In preparation for an on-site evaluation and accreditation by the American Council on Pharmaceutical Education (ACPE), the Albany College of Pharmacy employed project management techniques to complete a comprehensive self-study. A project lifecycle approach, including planning, production, and turnover phases, was used by the project's Self-Study Steering Committee. This approach, with minimal disruption to college operations, resulted in the completion of the self-study process on schedule. Throughout the project, the Steering Committee maintained a log of functions that either were executed successfully or in hindsight, could have been improved. To assess the effectiveness of the project management approach to the the self-study process, feedback was obtained from the College community through a poststudy survey. This feedback, coupled with the Steering Committee's data on possible improvements, form the basis for the lessons learned during this self-study process. PMID:17533432

  13. A project management approach to an ACPE accreditation self-study.

    PubMed

    Dominelli, Angela; Iwanowicz, Susan L; Bailie, George R; Clarke, David W; McGraw, Patrick S

    2007-04-15

    In preparation for an on-site evaluation and accreditation by the American Council on Pharmaceutical Education (ACPE), the Albany College of Pharmacy employed project management techniques to complete a comprehensive self-study. A project lifecycle approach, including planning, production, and turnover phases, was used by the project's Self-Study Steering Committee. This approach, with minimal disruption to college operations, resulted in the completion of the self-study process on schedule. Throughout the project, the Steering Committee maintained a log of functions that either were executed successfully or in hindsight, could have been improved. To assess the effectiveness of the project management approach to the the self-study process, feedback was obtained from the College community through a poststudy survey. This feedback, coupled with the Steering Committee's data on possible improvements, form the basis for the lessons learned during this self-study process.

  14. Healthcare quality measurement in orthopaedic surgery: current state of the art.

    PubMed

    Auerbach, Andrew

    2009-10-01

    Improving quality of care in arthroplasty is of increasing importance to payors, hospitals, surgeons, and patients. Efforts to compel improvement have traditionally focused measurement and reporting of data describing structural factors, care processes (or 'quality measures'), and clinical outcomes. Reporting structural measures (eg, surgical case volume) has been used with varying degrees of success. Care process measures, exemplified by initiatives such as the Surgical Care Improvement Project measures, are chosen based on the strength of randomized trial evidence linking the process to improved outcomes. However, evidence linking improved performance on Surgical Care Improvement Project measures with improved outcomes is limited. Outcome measures in surgery are of increasing importance as an approach to compel care improvement with prominent examples represented by the National Surgical Quality Improvement Project. Although outcomes-focused approaches are often costly, when linked to active benchmarking and collaborative activities, they may improve care broadly. Moreover, implementation of computerized data systems collecting information formerly collected on paper only will facilitate benchmarking. In the end, care will only be improved if these data are used to define methods for innovating care systems that deliver better outcomes at lower or equivalent costs.

  15. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Technical Reports Server (NTRS)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  16. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Astrophysics Data System (ADS)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  17. ICT and mobile health to improve clinical process delivery. a research project for therapy management process innovation.

    PubMed

    Locatelli, Paolo; Montefusco, Vittorio; Sini, Elena; Restifo, Nicola; Facchini, Roberta; Torresani, Michele

    2013-01-01

    The volume and the complexity of clinical and administrative information make Information and Communication Technologies (ICTs) essential for running and innovating healthcare. This paper tells about a project aimed to design, develop and implement a set of organizational models, acknowledged procedures and ICT tools (Mobile & Wireless solutions and Automatic Identification and Data Capture technologies) to improve actual support, safety, reliability and traceability of a specific therapy management (stem cells). The value of the project is to design a solution based on mobile and identification technology in tight collaboration with physicians and actors involved in the process to ensure usability and effectivenes in process management.

  18. The Climate Variability & Predictability (CVP) Program at NOAA - Recent Program Advancements

    NASA Astrophysics Data System (ADS)

    Lucas, S. E.; Todd, J. F.

    2015-12-01

    The Climate Variability & Predictability (CVP) Program supports research aimed at providing process-level understanding of the climate system through observation, modeling, analysis, and field studies. This vital knowledge is needed to improve climate models and predictions so that scientists can better anticipate the impacts of future climate variability and change. To achieve its mission, the CVP Program supports research carried out at NOAA and other federal laboratories, NOAA Cooperative Institutes, and academic institutions. The Program also coordinates its sponsored projects with major national and international scientific bodies including the World Climate Research Programme (WCRP), the International and U.S. Climate Variability and Predictability (CLIVAR/US CLIVAR) Program, and the U.S. Global Change Research Program (USGCRP). The CVP program sits within NOAA's Climate Program Office (http://cpo.noaa.gov/CVP). The CVP Program currently supports multiple projects in areas that are aimed at improved representation of physical processes in global models. Some of the topics that are currently funded include: i) Improved Understanding of Intraseasonal Tropical Variability - DYNAMO field campaign and post -field projects, and the new climate model improvement teams focused on MJO processes; ii) Climate Process Teams (CPTs, co-funded with NSF) with projects focused on Cloud macrophysical parameterization and its application to aerosol indirect effects, and Internal-Wave Driven Mixing in Global Ocean Models; iii) Improved Understanding of Tropical Pacific Processes, Biases, and Climatology; iv) Understanding Arctic Sea Ice Mechanism and Predictability;v) AMOC Mechanisms and Decadal Predictability Recent results from CVP-funded projects will be summarized. Additional information can be found at http://cpo.noaa.gov/CVP.

  19. Model-based software process improvement

    NASA Technical Reports Server (NTRS)

    Zettervall, Brenda T.

    1994-01-01

    The activities of a field test site for the Software Engineering Institute's software process definition project are discussed. Products tested included the improvement model itself, descriptive modeling techniques, the CMM level 2 framework document, and the use of process definition guidelines and templates. The software process improvement model represents a five stage cyclic approach for organizational process improvement. The cycles consist of the initiating, diagnosing, establishing, acting, and leveraging phases.

  20. Improvement Strategies at Six Culturally Different Schools. Final Report FY91-FY95, Leadership for Change Project.

    ERIC Educational Resources Information Center

    Fuentes, Nancy; And Others

    School leaders have begun to understand that "change is a process." Leaders must facilitate change, not merely disseminate or direct it. This publication presents findings of the Leadership for Change Project (LFC). The LFC studied six sites at different stages of the school-improvement process, including two "developmental" sites in Arkansas and…

  1. Fully Employing Software Inspections Data

    NASA Technical Reports Server (NTRS)

    Shull, Forrest; Feldmann, Raimund L.; Seaman, Carolyn; Regardie, Myrna; Godfrey, Sally

    2009-01-01

    Software inspections provide a proven approach to quality assurance for software products of all kinds, including requirements, design, code, test plans, among others. Common to all inspections is the aim of finding and fixing defects as early as possible, and thereby providing cost savings by minimizing the amount of rework necessary later in the lifecycle. Measurement data, such as the number and type of found defects and the effort spent by the inspection team, provide not only direct feedback about the software product to the project team but are also valuable for process improvement activities. In this paper, we discuss NASA's use of software inspections and the rich set of data that has resulted. In particular, we present results from analysis of inspection data that illustrate the benefits of fully utilizing that data for process improvement at several levels. Examining such data across multiple inspections or projects allows team members to monitor and trigger cross project improvements. Such improvements may focus on the software development processes of the whole organization as well as improvements to the applied inspection process itself.

  2. Redesigning the care of fragility fracture patients to improve osteoporosis management: a health care improvement project.

    PubMed

    Harrington, J Timothy; Barash, Harvey L; Day, Sherry; Lease, Joellen

    2005-04-15

    To develop new processes that assure more reliable, population-based care of fragility fracture patients. A 4-year clinical improvement project was performed in a multispecialty, community practice health system using evidence-based guidelines and rapid cycle process improvement methods (plan-do-study-act cycles). Prior to this project, appropriate osteoporosis care was provided to only 5% of our 1999 hip fracture patients. In 2001, primary physicians were provided prompts about appropriate care (cycle 1), which resulted in improved care for only 20% of patients. A process improvement pilot in 2002 (cycle 2) and full program implementation in 2003 (cycle 3) have assured osteoporosis care for all willing and able patients with any fragility fracture. Altogether, 58% of 2003 fragility fracture patients, including 46% of those with hip fracture, have had a bone measurement, have been assigned to osteoporosis care with their primary physician or a consultant, and are being monitored regularly. Only 19% refused osteoporosis care. Key process improvements have included using orthopedic billings to identify patients, referring patients directly from orthopedics to an osteoporosis care program, organizing care with a nurse manager and process management computer software, assigning patients to primary or consultative physician care based on disease severity, and monitoring adherence to therapy by telephone. Reliable osteoporosis care is achievable by redesigning clinical processes. Performance data motivate physicians to reconsider traditional approaches. Improving the care of osteoporosis and other chronic diseases requires coordinated care across specialty boundaries and health system support.

  3. SDM Virtualness Project

    NASA Technical Reports Server (NTRS)

    Lim, Christopher Yit-Seong; Klein, Janice

    2004-01-01

    In the summer of 2001, NASA and Ford Motor Company co-sponsored a research project aimed at improving the education process and application of lessons learned through distant education. The System Design & Management Program (SDM) was used as a laboratory for improving distance learning capabilities. The research project was a follow up to previous research on globally dispersed teams.

  4. Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

    NASA Technical Reports Server (NTRS)

    Dickinson, William B.

    1995-01-01

    An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

  5. Improved Methodology for Benefit Estimation of Preservation Projects

    DOT National Transportation Integrated Search

    2018-04-01

    This research report presents an improved process for evaluating the benefits and economic tradeoffs associated with a variety of highway preservation projects. It includes a summary of results from a comprehensive phone survey concerning the use and...

  6. A developmental evaluation to enhance stakeholder engagement in a wide-scale interactive project disseminating quality improvement data: study protocol for a mixed-methods study

    PubMed Central

    Laycock, Alison; Bailie, Jodie; Matthews, Veronica; Cunningham, Frances; Harvey, Gillian; Percival, Nikki; Bailie, Ross

    2017-01-01

    Introduction Bringing together continuous quality improvement (CQI) data from multiple health services offers opportunities to identify common improvement priorities and to develop interventions at various system levels to achieve large-scale improvement in care. An important principle of CQI is practitioner participation in interpreting data and planning evidence-based change. This study will contribute knowledge about engaging diverse stakeholders in collaborative and theoretically informed processes to identify and address priority evidence-practice gaps in care delivery. This paper describes a developmental evaluation to support and refine a novel interactive dissemination project using aggregated CQI data from Aboriginal and Torres Strait Islander primary healthcare centres in Australia. The project aims to effect multilevel system improvement in Aboriginal and Torres Strait Islander primary healthcare. Methods and analysis Data will be gathered using document analysis, online surveys, interviews with participants and iterative analytical processes with the research team. These methods will enable real-time feedback to guide refinements to the design, reports, tools and processes as the interactive dissemination project is implemented. Qualitative data from interviews and surveys will be analysed and interpreted to provide in-depth understanding of factors that influence engagement and stakeholder perspectives about use of the aggregated data and generated improvement strategies. Sources of data will be triangulated to build up a comprehensive, contextualised perspective and integrated understanding of the project's development, implementation and findings. Ethics and dissemination The Human Research Ethics Committee (HREC) of the Northern Territory Department of Health and Menzies School of Health Research (Project 2015-2329), the Central Australian HREC (Project 15-288) and the Charles Darwin University HREC (Project H15030) approved the study. Dissemination will include articles in peer-reviewed journals, policy and research briefs. Results will be presented at conferences and quality improvement network meetings. Researchers, clinicians, policymakers and managers developing evidence-based system and policy interventions should benefit from this research. PMID:28710222

  7. Ethnographic process evaluation of a quality improvement project to improve transitions of care for older people.

    PubMed

    Sutton, Elizabeth; Dixon-Woods, Mary; Tarrant, Carolyn

    2016-08-04

    Quality improvement projects to address transitions of care across care boundaries are increasingly common but meet with mixed success for reasons that are poorly understood. We aimed to characterise challenges in a project to improve transitions for older people between hospital and care homes. Independent process evaluation, using ethnographic observations and interviews, of a quality improvement project. An English hospital and two residential care homes for older people. 32 hours of non-participant observations and 12 semistructured interviews with project members, hospital and care home staff. A hospital-based improvement team sought to reduce unplanned readmissions from residential care homes using interventions including a community-based geriatric team that could be accessed directly by care homes and a communication tool intended to facilitate transfer of information between homes and hospital. Only very modest (if any) impacts of these interventions on readmission rates could be detected. The process evaluation identified multiple challenges in implementing interventions and securing improvement. Many of these arose because of lack of consensus on the nature of the problem and the proper solutions: while the hospital team was keen to reduce readmissions and saw the problems as lying in poor communication and lack of community-based support for care homes, the care home staff had different priorities. Care home staff were unconvinced that the improvement interventions were aligned with their needs or addressed their concerns, resulting in compromised implementation. Process evaluations have a valuable role in quality improvement. Our study suggests that a key task for quality improvement projects aimed at transitions of care is that of developing a shared view of the problem to be addressed. A more participatory approach could help to surface assumptions, interpretations and interests and could facilitate the coproduction of solutions. This finding is likely to have broader applicability. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  8. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    NASA Astrophysics Data System (ADS)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  9. DOE-GO-14154-1 OHIO FINAL report Velocys 30Sept08

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terry J. Mazanec

    2008-09-30

    The overall goal of the OHIO project was to develop a commercially viable high intensity process to produce ethylene by controlled catalytic reaction of ethane with oxygen in a microchannel reactor. Microchannel technology provides a breakthrough solution to the challenges identified in earlier development work on catalytic ethane oxidation. Heat and mass transfer limitations at the catalyst surface create destructively high temperatures that are responsible for increased production of waste products (CO, CO2, and CH4). The OHIO project focused on microscale energy and mass transfer management, designed to alleviate these transport limitations, thereby improving catalyst selectivity and saving energy-rich feedstock.more » The OHIO project evaluated ethane oxidation in small scale microchannel laboratory reactors including catalyst test units, and full commercial length single- and multi-channel reactors. Small scale catalyst and single channel results met target values for ethylene yields, demonstrating that the microchannel concept improves mass and heat transport compared to conventional reactors and results in improved ethylene yield. Earlier economic sensitivity studies of ethane oxidation processes suggested that only modest improvements were necessary to provide a system that provides significant feedstock, energy, and capital benefits compared to conventional steam ethane cracking. The key benefit derived from the OHIO process is energy savings. Ethylene production consumes more energy than any other U.S. chemical process.1 The OHIO process offers improved feedstock utilization and substantial energy savings due to a novel reaction pathway and the unique abilities of microchannel process technology to control the reaction temperature and other critical process parameters. Based on projected economic benefits of the process, the potential energy savings could reach 150 trillion Btu/yr by the year 2020, which is the equivalent of over 25 million barrels of oil.« less

  10. Project description and crowdfunding success: an exploratory study.

    PubMed

    Zhou, Mi Jamie; Lu, Baozhou; Fan, Weiguo Patrick; Wang, G Alan

    2018-01-01

    Existing research on antecedent of funding success mainly focuses on basic project properties such as funding goal, duration, and project category. In this study, we view the process by which project owners raise funds from backers as a persuasion process through project descriptions. Guided by the unimodel theory of persuasion, this study identifies three exemplary antecedents (length, readability, and tone) from the content of project descriptions and two antecedents (past experience and past expertise) from the trustworthy cue of project descriptions. We then investigate their impacts on funding success. Using data collected from Kickstarter, a popular crowdfunding platform, we find that these antecedents are significantly associated with funding success. Empirical results show that the proposed model that incorporated these antecedents can achieve an accuracy of 73 % (70 % in F-measure). The result represents an improvement of roughly 14 percentage points over the baseline model based on informed guessing and 4 percentage points improvement over the mainstream model based on basic project properties (or 44 % improvement of mainstream's performance over informed guessing). The proposed model also has superior true positive and true negative rates. We also investigate the timeliness of project data and find that old project data is gradually becoming less relevant and losing predictive power to newly created projects. Overall, this study provides evidence that antecedents identified from project descriptions have incremental predictive power and can help project owners evaluate and improve the likelihood of funding success.

  11. The NCC project: A quality management perspective

    NASA Technical Reports Server (NTRS)

    Lee, Raymond H.

    1993-01-01

    The Network Control Center (NCC) Project introduced the concept of total quality management (TQM) in mid-1990. The CSC project team established a program which focused on continuous process improvement in software development methodology and consistent deliveries of high quality software products for the NCC. The vision of the TQM program was to produce error free software. Specific goals were established to allow continuing assessment of the progress toward meeting the overall quality objectives. The total quality environment, now a part of the NCC Project culture, has become the foundation for continuous process improvement and has resulted in the consistent delivery of quality software products over the last three years.

  12. Development of a Rolling Process Design Tool for Use in Improving Hot Roll Slab Recovery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Couch, R; Becker, R; Rhee, M

    2004-09-24

    Lawrence Livermore National Laboratory participated in a U. S. Department of Energy/Office of Industrial Technology sponsored research project 'Development of a Rolling Process Design Tool for Use in Improving Hot Roll Slab Recovery', as a Cooperative Agreement TC-02028 with the Alcoa Technical Center (ATC). The objective of the joint project with Alcoa is to develop a numerical modeling capability to optimize the hot rolling process used to produce aluminum plate. Product lost in the rolling process and subsequent recycling, wastes resources consumed in the energy-intensive steps of remelting and reprocessing the ingot. The modeling capability developed by project partners willmore » be used to produce plate more efficiently and with reduced product loss.« less

  13. Customers First: Using Process Improvement To Improve Service Quality and Efficiency.

    ERIC Educational Resources Information Center

    Larson, Catherine A.

    1998-01-01

    Describes steps in a process-improvement project for reserve book services at the University of Arizona Library: (1) plan--identify process boundaries and customer requirements, gather/analyze data, prioritize problems; (2) do--encourage divergent thinking, reach convergent thinking, find solutions; (3) check--pilot solutions, compare costs; and…

  14. Distributed Wind Competitiveness Improvement Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2016-05-01

    The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. Manufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. This fact sheet describes the CIP and funding awarded as part of the project.

  15. Implementation of advanced LCNG fueling infrastructure in Texas along the I-35/NAFTA Clean Corridor Project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, Stan; Hightower, Jared; Knight, Koby

    This report documents the process of planning, siting, and permitting recent LCNG station projects; identifying existing constraints in these processes, and recommendations for improvements; LCNG operating history.

  16. Rigor + Results = Impact: Measuring Impact with Integrity (Invited)

    NASA Astrophysics Data System (ADS)

    Davis, H. B.; Scalice, D.

    2013-12-01

    Are you struggling to measure and explain the impact of your EPO efforts? The NASA Astrobiology Institute (NAI) is using an evaluation process to determine the impact of its 15 EPO projects with over 200 activities. What is the current impact? How can it be improved in the future? We have developed a process that preserves autonomy at the project implementation level while still painting a picture of the entire portfolio. The impact evaluation process looks at an education/public outreach activity through its entire project cycle. Working with an external evaluator, education leads: 1) rate the quality/health of an activity in each stage of its cycle, and 2) determine the impact based on the results of the evaluation and the rigor of the methods used. The process has created a way to systematically codify a project's health and its impact, while offering support for improving both impact and how it is measured.

  17. A process improvement model for software verification and validation

    NASA Technical Reports Server (NTRS)

    Callahan, John; Sabolish, George

    1994-01-01

    We describe ongoing work at the NASA Independent Verification and Validation (IV&V) Facility to establish a process improvement model for software verification and validation (V&V) organizations. This model, similar to those used by some software development organizations, uses measurement-based techniques to identify problem areas and introduce incremental improvements. We seek to replicate this model for organizations involved in V&V on large-scale software development projects such as EOS and space station. At the IV&V Facility, a university research group and V&V contractors are working together to collect metrics across projects in order to determine the effectiveness of V&V and improve its application. Since V&V processes are intimately tied to development processes, this paper also examines the repercussions for development organizations in large-scale efforts.

  18. A process improvement model for software verification and validation

    NASA Technical Reports Server (NTRS)

    Callahan, John; Sabolish, George

    1994-01-01

    We describe ongoing work at the NASA Independent Verification and Validation (IV&V) Facility to establish a process improvement model for software verification and validation (V&V) organizations. This model, similar to those used by some software development organizations, uses measurement-based techniques to identify problem areas and introduce incremental improvements. We seek to replicate this model for organizations involved in V&V on large-scale software development projects such as EOS and Space Station. At the IV&V Facility, a university research group and V&V contractors are working together to collect metrics across projects in order to determine the effectiveness of V&V and improve its application. Since V&V processes are intimately tied to development processes, this paper also examines the repercussions for development organizations in large-scale efforts.

  19. Integrating Theory and Practice: Applying the Quality Improvement Paradigm to Product Line Engineering

    NASA Technical Reports Server (NTRS)

    Stark, Michael; Hennessy, Joseph F. (Technical Monitor)

    2002-01-01

    My assertion is that not only are product lines a relevant research topic, but that the tools used by empirical software engineering researchers can address observed practical problems. Our experience at NASA has been there are often externally proposed solutions available, but that we have had difficulties applying them in our particular context. We have also focused on return on investment issues when evaluating product lines, and while these are important, one can not attain objective data on success or failure until several applications from a product family have been deployed. The use of the Quality Improvement Paradigm (QIP) can address these issues: (1) Planning an adoption path from an organization's current state to a product line approach; (2) Constructing a development process to fit the organization's adoption path; (3) Evaluation of product line development processes as the project is being developed. The QIP consists of the following six steps: (1) Characterize the project and its environment; (2) Set quantifiable goals for successful project performance; (3) Choose the appropriate process models, supporting methods, and tools for the project; (4) Execute the process, analyze interim results, and provide real-time feedback for corrective action; (5) Analyze the results of completed projects and recommend improvements; and (6) Package the lessons learned as updated and refined process models. A figure shows the QIP in detail. The iterative nature of the QIP supports an incremental development approach to product lines, and the project learning and feedback provide the necessary early evaluations.

  20. Improving Organizational Productivity in NASA. Volume 2

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Recognizing that NASA has traditionally been in the forefront of technological change, the NASA Administrator challenged the Agency in 1982 to also become a leader in developing and applying advanced technology and management practices to increase productivity. One of the activities undertaken by the Agency to support this ambitious productivity goal was participation in a 2-year experimental action research project devoted to learning more about improving and assessing the performance of professional organizations. Participating with a dozen private sector organizations, NASA explored the usefulness of a productivity improvement process that addressed all aspects of organizational performance. This experience has given NASA valuable insight into the enhancement of professional productivity. More importantly, it has provided the Agency with a specific management approach that managers and supervisors can effectively use to emphasize and implement continuous improvement. This report documents the experiences of the five different NASA installations participating in the project, describes the improvement process that was applied and refined, and offers recommendations for expanded application of that process. Of particular interest is the conclusion that measuring white collar productivity may be possible, and at a minimum, the measurement process itself is beneficial to management. Volume I of the report provides a project overview, significant findings, and recommendations. Volume II presents individual case studies of the NASA pilot projects that were part of the action research effort.

  1. Using Workflow Modeling to Identify Areas to Improve Genetic Test Processes in the University of Maryland Translational Pharmacogenomics Project.

    PubMed

    Cutting, Elizabeth M; Overby, Casey L; Banchero, Meghan; Pollin, Toni; Kelemen, Mark; Shuldiner, Alan R; Beitelshees, Amber L

    Delivering genetic test results to clinicians is a complex process. It involves many actors and multiple steps, requiring all of these to work together in order to create an optimal course of treatment for the patient. We used information gained from focus groups in order to illustrate the current process of delivering genetic test results to clinicians. We propose a business process model and notation (BPMN) representation of this process for a Translational Pharmacogenomics Project being implemented at the University of Maryland Medical Center, so that personalized medicine program implementers can identify areas to improve genetic testing processes. We found that the current process could be improved to reduce input errors, better inform and notify clinicians about the implications of certain genetic tests, and make results more easily understood. We demonstrate our use of BPMN to improve this important clinical process for CYP2C19 genetic testing in patients undergoing invasive treatment of coronary heart disease.

  2. Using Workflow Modeling to Identify Areas to Improve Genetic Test Processes in the University of Maryland Translational Pharmacogenomics Project

    PubMed Central

    Cutting, Elizabeth M.; Overby, Casey L.; Banchero, Meghan; Pollin, Toni; Kelemen, Mark; Shuldiner, Alan R.; Beitelshees, Amber L.

    2015-01-01

    Delivering genetic test results to clinicians is a complex process. It involves many actors and multiple steps, requiring all of these to work together in order to create an optimal course of treatment for the patient. We used information gained from focus groups in order to illustrate the current process of delivering genetic test results to clinicians. We propose a business process model and notation (BPMN) representation of this process for a Translational Pharmacogenomics Project being implemented at the University of Maryland Medical Center, so that personalized medicine program implementers can identify areas to improve genetic testing processes. We found that the current process could be improved to reduce input errors, better inform and notify clinicians about the implications of certain genetic tests, and make results more easily understood. We demonstrate our use of BPMN to improve this important clinical process for CYP2C19 genetic testing in patients undergoing invasive treatment of coronary heart disease. PMID:26958179

  3. SU-C-207-04: Reconstruction Artifact Reduction in X-Ray Cone Beam CT Using a Treatment Couch Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lasio, G; Hu, E; Zhou, J

    2015-06-15

    Purpose: to mitigate artifacts induced by the presence of the RT treatment couch in on-board CBCT and improve image quality Methods: a model of a Varian IGRT couch is constructed using a CBCT scan of the couch in air. The model is used to generate a set of forward projections (FP) of the treatment couch at specified gantry angles. The model couch forward projections are then used to process CBCT scan projections which contain the couch in addition to the scan object (Catphan phantom), in order to remove the attenuation component of the couch at any given gantry angle. Priormore » to pre-processing with the model FP, the Catphan projection data is normalized to an air scan with bowtie filter. The filtered Catphan projections are used to reconstruct the CBCT with an in-house FDK algorithm. The artifact reduction in the processed CBCT scan is assessed visually, and the image quality improvement is measured with the CNR over a few selected ROIs of the Catphan modules. Results: Sufficient match between the forward projected data and the x-ray projections is achieved to allow filtering in attenuation space. Visual improvement of the couch induced artifacts is achieved, with a moderate expense of CNR. Conclusion: Couch model-based correction of CBCT projection data has a potential for qualitative improvement of clinical CBCT scans, without requiring position specific correction data. The technique could be used to produce models of other artifact inducing devices, such as immobilization boards, and reduce their impact on patient CBCT images.« less

  4. Improving data collection, documentation, and workflow in a dementia screening study.

    PubMed

    Read, Kevin B; LaPolla, Fred Willie Zametkin; Tolea, Magdalena I; Galvin, James E; Surkis, Alisa

    2017-04-01

    A clinical study team performing three multicultural dementia screening studies identified the need to improve data management practices and facilitate data sharing. A collaboration was initiated with librarians as part of the National Library of Medicine (NLM) informationist supplement program. The librarians identified areas for improvement in the studies' data collection, entry, and processing workflows. The librarians' role in this project was to meet needs expressed by the study team around improving data collection and processing workflows to increase study efficiency and ensure data quality. The librarians addressed the data collection, entry, and processing weaknesses through standardizing and renaming variables, creating an electronic data capture system using REDCap, and developing well-documented, reproducible data processing workflows. NLM informationist supplements provide librarians with valuable experience in collaborating with study teams to address their data needs. For this project, the librarians gained skills in project management, REDCap, and understanding of the challenges and specifics of a clinical research study. However, the time and effort required to provide targeted and intensive support for one study team was not scalable to the library's broader user community.

  5. Improving Video Game Development: Facilitating Heterogeneous Team Collaboration through Flexible Software Processes

    NASA Astrophysics Data System (ADS)

    Musil, Juergen; Schweda, Angelika; Winkler, Dietmar; Biffl, Stefan

    Based on our observations of Austrian video game software development (VGSD) practices we identified a lack of systematic processes/method support and inefficient collaboration between various involved disciplines, i.e. engineers and artists. VGSD includes heterogeneous disciplines, e.g. creative arts, game/content design, and software. Nevertheless, improving team collaboration and process support is an ongoing challenge to enable a comprehensive view on game development projects. Lessons learned from software engineering practices can help game developers to increase game development processes within a heterogeneous environment. Based on a state of the practice survey in the Austrian games industry, this paper presents (a) first results with focus on process/method support and (b) suggests a candidate flexible process approach based on Scrum to improve VGSD and team collaboration. Results showed (a) a trend to highly flexible software processes involving various disciplines and (b) identified the suggested flexible process approach as feasible and useful for project application.

  6. Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

    NASA Technical Reports Server (NTRS)

    Raiman, Laura B.

    1991-01-01

    Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

  7. An improvement project within urological care.

    PubMed

    Khatami, Annelie; Rosengren, Kristina

    2015-01-01

    The purpose of this paper is to describe staff experiences in an on-going improvement project regarding patients with ureteral stones. A qualitative descriptive study based on eight group interviews and 48 narratives, was performed. Data were analysed using qualitative content analysis. Trustworthiness was ensured by using a well-documented improvement process method during six months. The results formed three categories: an absent comprehensive view; complexity; and vulnerability within the organisation. A holistic perspective regarding urological care at the micro-, meso- and macro-levels is needed to improve planning and caring processes. This study includes one team (six members, different health professionals) within the same urology department. Results show that staff need information, such as guidelines and support throughout the improvement work to deliver high-quality care. Moreover, there is a need for evidence-based guidelines at national level to support improvement work. Healthcare staff need to pay attention to all team member needs to improve urological care. Organisational and managerial aspect are needed to support clear and common goals regarding healthcare improvement work. Urological improvement projects, generally, are lacking, which is why this study is important to improve nephrolithiasis patient care.

  8. Heat pipe with improved wick structures

    DOEpatents

    Benson, David A.; Robino, Charles V.; Palmer, David W.; Kravitz, Stanley H.

    2000-01-01

    An improved planar heat pipe wick structure having projections formed by micromachining processes. The projections form arrays of interlocking, semi-closed structures with multiple flow paths on the substrate. The projections also include overhanging caps at their tops to increase the capillary pumping action of the wick structure. The capped projections can be formed in stacked layers. Another layer of smaller, more closely spaced projections without caps can also be formed on the substrate in between the capped projections. Inexpensive materials such as Kovar can be used as substrates, and the projections can be formed by electrodepositing nickel through photoresist masks.

  9. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    ERIC Educational Resources Information Center

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  10. Overview of the Integrated Programs for Aerospace Vehicle Design (IPAD) project

    NASA Technical Reports Server (NTRS)

    Venneri, S. L.

    1983-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of data base management technology and associated software for integrated company wide management of engineering and manufacturing information. Results to date on the IPAD project include an in depth documentation of a representative design process for a large engineering project, the definition and design of computer aided design software needed to support that process, and the release of prototype software to manage engineering information. This paper provides an overview of the IPAD project and summarizes progress to date and future plans.

  11. Methodologies for Improving Flight Project Information Capture, Storage, and Dissemination

    NASA Technical Reports Server (NTRS)

    Equils, Douglas J.

    2011-01-01

    This paper will discuss the drawbacks and risks of the current documentation paradigm, how Document QuickStart improves on that process and ultimately how this stream-lined approach will reduce risk and costs to the next generation of Flight Projects at JPL

  12. Improvement in Patient Transfer Process From the Operating Room to the PICU Using a Lean and Six Sigma-Based Quality Improvement Project.

    PubMed

    Gleich, Stephen J; Nemergut, Michael E; Stans, Anthony A; Haile, Dawit T; Feigal, Scott A; Heinrich, Angela L; Bosley, Christopher L; Tripathi, Sandeep

    2016-08-01

    Ineffective and inefficient patient transfer processes can increase the chance of medical errors. Improvements in such processes are high-priority local institutional and national patient safety goals. At our institution, nonintubated postoperative pediatric patients are first admitted to the postanesthesia care unit before transfer to the PICU. This quality improvement project was designed to improve the patient transfer process from the operating room (OR) to the PICU. After direct observation of the baseline process, we introduced a structured, direct OR-PICU transfer process for orthopedic spinal fusion patients. We performed value stream mapping of the process to determine error-prone and inefficient areas. We evaluated primary outcome measures of handoff error reduction and the overall efficiency of patient transfer process time. Staff satisfaction was evaluated as a counterbalance measure. With the introduction of the new direct OR-PICU patient transfer process, the handoff communication error rate improved from 1.9 to 0.3 errors per patient handoff (P = .002). Inefficiency (patient wait time and non-value-creating activity) was reduced from 90 to 32 minutes. Handoff content was improved with fewer information omissions (P < .001). Staff satisfaction significantly improved among nearly all PICU providers. By using quality improvement methodology to design and implement a new direct OR-PICU transfer process with a structured multidisciplinary verbal handoff, we achieved sustained improvements in patient safety and efficiency. Handoff communication was enhanced, with fewer errors and content omissions. The new process improved efficiency, with high staff satisfaction. Copyright © 2016 by the American Academy of Pediatrics.

  13. 23 CFR 924.9 - Planning.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... evaluation process to analyze and assess results achieved by the HSIP and uses this information, where... program of projects, technologies, or strategies to reduce or eliminate highway safety hazards; (G) Adopts... elements to develop highway safety improvement projects. (5) A process for establishing priorities for...

  14. 23 CFR 924.9 - Planning.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... evaluation process to analyze and assess results achieved by the HSIP and uses this information, where... program of projects, technologies, or strategies to reduce or eliminate highway safety hazards; (G) Adopts... elements to develop highway safety improvement projects. (5) A process for establishing priorities for...

  15. 23 CFR 924.9 - Planning.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... evaluation process to analyze and assess results achieved by the HSIP and uses this information, where... program of projects, technologies, or strategies to reduce or eliminate highway safety hazards; (G) Adopts... elements to develop highway safety improvement projects. (5) A process for establishing priorities for...

  16. TRIHALOMETHANE PRECURSOR REMOVAL BY THE MAGNESIUM CARBONATE PROCESS

    EPA Science Inventory

    A project was conducted to determine and improve the ability of the magnesium carbonate process to remove trihalomethane (THM) precursors in treated drinking water. The project was conducted at a drinking water treatment plant in Melbourne, FL, which had been developed and instal...

  17. A review of the Virginia Department of Transportation's scoping process and options for potential improvements.

    DOT National Transportation Integrated Search

    2008-01-01

    Transportation project scoping is a process where the project's purpose and need, budget, schedule, and scope are developed. Interviews conducted with 27 staff representing VDOT, FHWA, and regional planners, coupled with a review of related literatur...

  18. How to Begin a Quality Improvement Project.

    PubMed

    Silver, Samuel A; Harel, Ziv; McQuillan, Rory; Weizman, Adam V; Thomas, Alison; Chertow, Glenn M; Nesrallah, Gihad; Bell, Chaim M; Chan, Christopher T

    2016-05-06

    Quality improvement involves a combined effort among health care staff and stakeholders to diagnose and treat problems in the health care system. However, health care professionals often lack training in quality improvement methods, which makes it challenging to participate in improvement efforts. This article familiarizes health care professionals with how to begin a quality improvement project. The initial steps involve forming an improvement team that possesses expertise in the quality of care problem, leadership, and change management. Stakeholder mapping and analysis are useful tools at this stage, and these are reviewed to help identify individuals who might have a vested interest in the project. Physician engagement is a particularly important component of project success, and the knowledge that patients/caregivers can offer as members of a quality improvement team should not be overlooked. After a team is formed, an improvement framework helps to organize the scientific process of system change. Common quality improvement frameworks include Six Sigma, Lean, and the Model for Improvement. These models are contrasted, with a focus on the Model for Improvement, because it is widely used and applicable to a variety of quality of care problems without advanced training. It involves three steps: setting aims to focus improvement, choosing a balanced set of measures to determine if improvement occurs, and testing new ideas to change the current process. These new ideas are evaluated using Plan-Do-Study-Act cycles, where knowledge is gained by testing changes and reflecting on their effect. To show the real world utility of the quality improvement methods discussed, they are applied to a hypothetical quality improvement initiative that aims to promote home dialysis (home hemodialysis and peritoneal dialysis). This provides an example that kidney health care professionals can use to begin their own quality improvement projects. Copyright © 2016 by the American Society of Nephrology.

  19. How to Begin a Quality Improvement Project

    PubMed Central

    Harel, Ziv; McQuillan, Rory; Weizman, Adam V.; Thomas, Alison; Chertow, Glenn M.; Nesrallah, Gihad; Bell, Chaim M.; Chan, Christopher T.

    2016-01-01

    Quality improvement involves a combined effort among health care staff and stakeholders to diagnose and treat problems in the health care system. However, health care professionals often lack training in quality improvement methods, which makes it challenging to participate in improvement efforts. This article familiarizes health care professionals with how to begin a quality improvement project. The initial steps involve forming an improvement team that possesses expertise in the quality of care problem, leadership, and change management. Stakeholder mapping and analysis are useful tools at this stage, and these are reviewed to help identify individuals who might have a vested interest in the project. Physician engagement is a particularly important component of project success, and the knowledge that patients/caregivers can offer as members of a quality improvement team should not be overlooked. After a team is formed, an improvement framework helps to organize the scientific process of system change. Common quality improvement frameworks include Six Sigma, Lean, and the Model for Improvement. These models are contrasted, with a focus on the Model for Improvement, because it is widely used and applicable to a variety of quality of care problems without advanced training. It involves three steps: setting aims to focus improvement, choosing a balanced set of measures to determine if improvement occurs, and testing new ideas to change the current process. These new ideas are evaluated using Plan-Do-Study-Act cycles, where knowledge is gained by testing changes and reflecting on their effect. To show the real world utility of the quality improvement methods discussed, they are applied to a hypothetical quality improvement initiative that aims to promote home dialysis (home hemodialysis and peritoneal dialysis). This provides an example that kidney health care professionals can use to begin their own quality improvement projects. PMID:27016497

  20. A developmental evaluation to enhance stakeholder engagement in a wide-scale interactive project disseminating quality improvement data: study protocol for a mixed-methods study.

    PubMed

    Laycock, Alison; Bailie, Jodie; Matthews, Veronica; Cunningham, Frances; Harvey, Gillian; Percival, Nikki; Bailie, Ross

    2017-07-13

    Bringing together continuous quality improvement (CQI) data from multiple health services offers opportunities to identify common improvement priorities and to develop interventions at various system levels to achieve large-scale improvement in care. An important principle of CQI is practitioner participation in interpreting data and planning evidence-based change. This study will contribute knowledge about engaging diverse stakeholders in collaborative and theoretically informed processes to identify and address priority evidence-practice gaps in care delivery. This paper describes a developmental evaluation to support and refine a novel interactive dissemination project using aggregated CQI data from Aboriginal and Torres Strait Islander primary healthcare centres in Australia. The project aims to effect multilevel system improvement in Aboriginal and Torres Strait Islander primary healthcare. Data will be gathered using document analysis, online surveys, interviews with participants and iterative analytical processes with the research team. These methods will enable real-time feedback to guide refinements to the design, reports, tools and processes as the interactive dissemination project is implemented. Qualitative data from interviews and surveys will be analysed and interpreted to provide in-depth understanding of factors that influence engagement and stakeholder perspectives about use of the aggregated data and generated improvement strategies. Sources of data will be triangulated to build up a comprehensive, contextualised perspective and integrated understanding of the project's development, implementation and findings. The Human Research Ethics Committee (HREC) of the Northern Territory Department of Health and Menzies School of Health Research (Project 2015-2329), the Central Australian HREC (Project 15-288) and the Charles Darwin University HREC (Project H15030) approved the study. Dissemination will include articles in peer-reviewed journals, policy and research briefs. Results will be presented at conferences and quality improvement network meetings. Researchers, clinicians, policymakers and managers developing evidence-based system and policy interventions should benefit from this research. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  1. Final Report Collaborative Project. Improving the Representation of Coastal and Estuarine Processes in Earth System Models

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bryan, Frank; Dennis, John; MacCready, Parker

    This project aimed to improve long term global climate simulations by resolving and enhancing the representation of the processes involved in the cycling of freshwater through estuaries and coastal regions. This was a collaborative multi-institution project consisting of physical oceanographers, climate model developers, and computational scientists. It specifically targeted the DOE objectives of advancing simulation and predictive capability of climate models through improvements in resolution and physical process representation. The main computational objectives were: 1. To develop computationally efficient, but physically based, parameterizations of estuary and continental shelf mixing processes for use in an Earth System Model (CESM). 2. Tomore » develop a two-way nested regional modeling framework in order to dynamically downscale the climate response of particular coastal ocean regions and to upscale the impact of the regional coastal processes to the global climate in an Earth System Model (CESM). 3. To develop computational infrastructure to enhance the efficiency of data transfer between specific sources and destinations, i.e., a point-to-point communication capability, (used in objective 1) within POP, the ocean component of CESM.« less

  2. Realizing Improvement through Team Empowerment (RITE): A Team-based, Project-based Multidisciplinary Improvement Program.

    PubMed

    Larson, David B; Mickelsen, L Jake; Garcia, Kandice

    2016-01-01

    Performance improvement in a complex health care environment depends on the cooperation of diverse individuals and groups, allocation of time and resources, and use of effective improvement methods. To address this challenge, we developed an 18-week multidisciplinary training program that would also provide a vehicle for effecting needed improvements, by using a team- and project-based model. The program began in the radiology department and subsequently expanded to include projects from throughout the medical center. Participants were taught a specific method for team-based problem solving, which included (a) articulating the problem, (b) observing the process, (c) analyzing possible causes of problems, (d) identifying key drivers, (e) testing and refining interventions, and (f) providing for sustainment of results. Progress was formally reviewed on a weekly basis. A total of 14 teams consisting of 78 participants completed the course in two cohorts; one project was discontinued. All completed projects resulted in at least modest improvement. Mean skill scores increased from 2.5/6 to 4.5/6 (P < .01), and the mean satisfaction score was 4.7/5. Identified keys to success include (a) engagement of frontline staff, (b) teams given authority to make process changes, (c) capable improvement coaches, (d) a physician-director with improvement expertise and organizational authority, (e) capable administrative direction, (f) supportive organizational leaders, (g) weekly progress reviews, (h) timely educational material, (i) structured problem-solving methods, and ( j ) multiple projects working simultaneously. The purpose of this article is to review the program, including the methods and results, and discuss perceived keys to program success. © RSNA, 2016.

  3. (abstract) Mission Operations and Control Assurance: Flight Operations Quality Improvements

    NASA Technical Reports Server (NTRS)

    Welz, Linda L.; Bruno, Kristin J.; Kazz, Sheri L.; Witkowski, Mona M.

    1993-01-01

    Mission Operations and Command Assurance (MO&CA), a recent addition to flight operations teams at JPL. provides a system level function to instill quality in mission operations. MO&CA's primary goal at JPL is to help improve the operational reliability for projects during flight. MO&CA tasks include early detection and correction of process design and procedural deficiencies within projects. Early detection and correction are essential during development of operational procedures and training of operational teams. MO&CA's effort focuses directly on reducing the probability of radiating incorrect commands to a spacecraft. Over the last seven years at JPL, MO&CA has become a valuable asset to JPL flight projects. JPL flight projects have benefited significantly from MO&CA's efforts to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit directly from previous and ongoing experience. Since MO&CA, like Total Quality Management (TQM), focuses on continuous improvement of processes and elimination of rework, we recommend that this effort be continued on NASA flight projects.

  4. Using new media to build social capital for health: a qualitative process evaluation study of participation in the CityNet project.

    PubMed

    Bolam, Bruce; McLean, Carl; Pennington, Andrew; Gillies, Pamela

    2006-03-01

    The present article presents an exploratory qualitative process evaluation study of 'Ambassador' participation in CityNet, an innovative information-communication technology-based (ICT) project that aims to build aspects of social capital and improve access to information and services among disadvantaged groups in Nottingham, UK. A purposive sample of 40 'Ambassadors' interviewees was gathered in three waves of data collection. The two emergent analytic themes highlighted how improvements in confidence, self-esteem and social networks produced via participation were mitigated by structural problems in devolving power within the project. This illustrates how concepts of power are important for understanding the process of health promotion interventions using new media.

  5. Using Pilots to Assess the Value and Approach of CMMI Implementation

    NASA Technical Reports Server (NTRS)

    Godfrey, Sara; Andary, James; Rosenberg, Linda

    2002-01-01

    At Goddard Space Flight Center (GSFC), we have chosen to use Capability Maturity Model Integrated (CMMI) to guide our process improvement program. Projects at GSFC consist of complex systems of software and hardware that control satellites, operate ground systems, run instruments, manage databases and data and support scientific research. It is a challenge to launch a process improvement program that encompasses our diverse systems, yet is manageable in terms of cost effectiveness. In order to establish the best approach for improvement, our process improvement effort was divided into three phases: 1) Pilot projects; 2) Staged implementation; and 3) Sustainment and continual improvement. During Phase 1 the focus of the activities was on a baselining process, using pre-appraisals in order to get a baseline for making a better cost and effort estimate for the improvement effort. Pilot pre-appraisals were conducted from different perspectives so different approaches for process implementation could be evaluated. Phase 1 also concentrated on establishing an improvement infrastructure and training of the improvement teams. At the time of this paper, three pilot appraisals have been completed. Our initial appraisal was performed in a flight software area, considering the flight software organization as the organization. The second appraisal was done from a project perspective, focusing on systems engineering and acquisition, and using the organization as GSFC. The final appraisal was in a ground support software area, again using GSFC as the organization. This paper will present our initial approach, lessons learned from all three pilots and the changes in our approach based on the lessons learned.

  6. Managing risks in the project pipeline.

    DOT National Transportation Integrated Search

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  7. Strategies for improving transportation project delivery performance.

    DOT National Transportation Integrated Search

    2016-09-01

    project delivery performance for the various contracting methods that are : applicable for CTDOTs use. The report is structured in two parts. Part A covers overall : project deliverability and Part B is focused on environmental review processes an...

  8. Transitioning from Distributed and Traditional to Distributed and Agile: An Experience Report

    NASA Astrophysics Data System (ADS)

    Wildt, Daniel; Prikladnicki, Rafael

    Global companies that experienced extensive waterfall phased plans are trying to improve their existing processes to expedite team engagement. Agile methodologies have become an acceptable path to follow because it comprises project management as part of its practices. Agile practices have been used with the objective of simplifying project control through simple processes, easy to update documentation and higher team iteration over exhaustive documentation, focusing rather on team continuous improvement and aiming to add value to business processes. The purpose of this chapter is to describe the experience of a global multinational company on transitioning from distributed and traditional to distributed and agile. This company has development centers across North America, South America and Asia. This chapter covers challenges faced by the project teams of two pilot projects, including strengths of using agile practices in a globally distributed environment and practical recommendations for similar endeavors.

  9. NASA/NOAA implementation of the USAID-sponsored satellite ground station and data processing facility for Bangladesh

    NASA Technical Reports Server (NTRS)

    Dodge, J. C.; Vermillion, C. H.

    1983-01-01

    A description is given of a project to transfer multiple environmental satellite data reception, processing, and interpretation capabilities from the U.S. to Bangladesh. The goal of the project is to improve the management of resources related primarily to agriculture, water development, forestry, and fisheries. It is also hoped to improve the existing cyclone/storm surge warning system. An account is given of the interagency and international cooperation underlying the project. The remote-sensing installation in Dhaka, Bangladesh, is described, and the most likely system applications are summarized. Attention is also given to the special requirements concerning this type of technology transfer, and an assessment is made of the project's practical value to Bangladesh.

  10. Benchmarking facilities providing care: An international overview of initiatives

    PubMed Central

    Thonon, Frédérique; Watson, Jonathan; Saghatchian, Mahasti

    2015-01-01

    We performed a literature review of existing benchmarking projects of health facilities to explore (1) the rationales for those projects, (2) the motivation for health facilities to participate, (3) the indicators used and (4) the success and threat factors linked to those projects. We studied both peer-reviewed and grey literature. We examined 23 benchmarking projects of different medical specialities. The majority of projects used a mix of structure, process and outcome indicators. For some projects, participants had a direct or indirect financial incentive to participate (such as reimbursement by Medicaid/Medicare or litigation costs related to quality of care). A positive impact was reported for most projects, mainly in terms of improvement of practice and adoption of guidelines and, to a lesser extent, improvement in communication. Only 1 project reported positive impact in terms of clinical outcomes. Success factors and threats are linked to both the benchmarking process (such as organisation of meetings, link with existing projects) and indicators used (such as adjustment for diagnostic-related groups). The results of this review will help coordinators of a benchmarking project to set it up successfully. PMID:26770800

  11. Process maturity progress at Motorola Cellular Systems Division

    NASA Technical Reports Server (NTRS)

    Borgstahl, Ron; Criscione, Mark; Dobson, Kim; Willey, Allan

    1994-01-01

    We believe that the key success elements are related to our recognition that Software Process Improvement (SPI) can and should be organized, planned, managed, and measured as if it were a project to develop a new process, analogous to a software product. We believe that our process improvements have come as the result of these key elements: use of a rigorous, detailed requirements set (Capability Maturity Model, CMM); use of a robust, yet flexible architecture (IEEE 1074); use of a SPI project, resourced and managed like other work, to produce the specifications and implement them; and development of both internal and external goals, with metrics to support them.

  12. Speaking the right language: the scientific method as a framework for a continuous quality improvement program within academic medical research compliance units.

    PubMed

    Nolte, Kurt B; Stewart, Douglas M; O'Hair, Kevin C; Gannon, William L; Briggs, Michael S; Barron, A Marie; Pointer, Judy; Larson, Richard S

    2008-10-01

    The authors developed a novel continuous quality improvement (CQI) process for academic biomedical research compliance administration. A challenge in developing a quality improvement program in a nonbusiness environment is that the terminology and processes are often foreign. Rather than training staff in an existing quality improvement process, the authors opted to develop a novel process based on the scientific method--a paradigm familiar to all team members. The CQI process included our research compliance units. Unit leaders identified problems in compliance administration where a resolution would have a positive impact and which could be resolved or improved with current resources. They then generated testable hypotheses about a change to standard practice expected to improve the problem, and they developed methods and metrics to assess the impact of the change. The CQI process was managed in a "peer review" environment. The program included processes to reduce the incidence of infections in animal colonies, decrease research protocol-approval times, improve compliance and protection of animal and human research subjects, and improve research protocol quality. This novel CQI approach is well suited to the needs and the unique processes of research compliance administration. Using the scientific method as the improvement paradigm fostered acceptance of the project by unit leaders and facilitated the development of specific improvement projects. These quality initiatives will allow us to improve support for investigators while ensuring that compliance standards continue to be met. We believe that our CQI process can readily be used in other academically based offices of research.

  13. Improving data collection, documentation, and workflow in a dementia screening study

    PubMed Central

    Read, Kevin B.; LaPolla, Fred Willie Zametkin; Tolea, Magdalena I.; Galvin, James E.; Surkis, Alisa

    2017-01-01

    Background A clinical study team performing three multicultural dementia screening studies identified the need to improve data management practices and facilitate data sharing. A collaboration was initiated with librarians as part of the National Library of Medicine (NLM) informationist supplement program. The librarians identified areas for improvement in the studies’ data collection, entry, and processing workflows. Case Presentation The librarians’ role in this project was to meet needs expressed by the study team around improving data collection and processing workflows to increase study efficiency and ensure data quality. The librarians addressed the data collection, entry, and processing weaknesses through standardizing and renaming variables, creating an electronic data capture system using REDCap, and developing well-documented, reproducible data processing workflows. Conclusions NLM informationist supplements provide librarians with valuable experience in collaborating with study teams to address their data needs. For this project, the librarians gained skills in project management, REDCap, and understanding of the challenges and specifics of a clinical research study. However, the time and effort required to provide targeted and intensive support for one study team was not scalable to the library’s broader user community. PMID:28377680

  14. A quality improvement project using statistical process control methods for type 2 diabetes control in a resource-limited setting.

    PubMed

    Flood, David; Douglas, Kate; Goldberg, Vera; Martinez, Boris; Garcia, Pablo; Arbour, MaryCatherine; Rohloff, Peter

    2017-08-01

    Quality improvement (QI) is a key strategy for improving diabetes care in low- and middle-income countries (LMICs). This study reports on a diabetes QI project in rural Guatemala whose primary aim was to improve glycemic control of a panel of adult diabetes patients. Formative research suggested multiple areas for programmatic improvement in ambulatory diabetes care. This project utilized the Model for Improvement and Agile Global Health, our organization's complementary healthcare implementation framework. A bundle of improvement activities were implemented at the home, clinic and institutional level. Control charts of mean hemoglobin A1C (HbA1C) and proportion of patients meeting target HbA1C showed improvement as special cause variation was identified 3 months after the intervention began. Control charts for secondary process measures offered insights into the value of different components of the intervention. Intensity of home-based diabetes education emerged as an important driver of panel glycemic control. Diabetes QI work is feasible in resource-limited settings in LMICs and can improve glycemic control. Statistical process control charts are a promising methodology for use with panels or registries of diabetes patients. © The Author 2017. Published by Oxford University Press in association with the International Society for Quality in Health Care. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com

  15. Reengineering the Project Design Process

    NASA Technical Reports Server (NTRS)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  16. 78 FR 53436 - Improving Performance of Federal Permitting and Review of Infrastructure Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... an efficient decision-making process within each agency; to the extent possible, unifying and... IIP Process, the developer is encouraged to inform DOE in writing as soon as possible of its decision... to improve the performance of Federal siting, permitting, and review processes for infrastructure...

  17. Application of the SEIPS Model to Analyze Medication Safety in a Crisis Residential Center.

    PubMed

    Steele, Maria L; Talley, Brenda; Frith, Karen H

    2018-02-01

    Medication safety and error reduction has been studied in acute and long-term care settings, but little research is found in the literature regarding mental health settings. Because mental health settings are complex, medication administration is vulnerable to a variety of errors from transcription to administration. The purpose of this study was to analyze critical factors related to a mental health work system structure and processes that threaten safe medication administration practices. The Systems Engineering Initiative for Patient Safety (SEIPS) model provides a framework to analyze factors affecting medication safety. The model approach analyzes the work system concepts of technology, tasks, persons, environment, and organization to guide the collection of data. In the study, the Lean methodology tools were used to identify vulnerabilities in the system that could be targeted later for improvement activities. The project director completed face-to-face interviews, asked nurses to record disruptions in a log, and administered a questionnaire to nursing staff. The project director also conducted medication chart reviews and recorded medication errors using a standardized taxonomy for errors that allowed categorization of the prevalent types of medication errors. Results of the study revealed disruptions during the medication process, pharmacology training needs, and documentation processes as the primary opportunities for improvement. The project engaged nurses to identify sustainable quality improvement strategies to improve patient safety. The mental health setting carries challenges for safe medication administration practices. Through analysis of the structure, process, and outcomes of medication administration, opportunities for quality improvement and sustainable interventions were identified, including minimizing the number of distractions during medication administration, training nurses on psychotropic medications, and improving the documentation system. A task force was created to analyze the descriptive data and to establish objectives aimed at improving efficiency of the work system and care process involved in medication administration at the end of the project. Copyright © 2017 Elsevier Inc. All rights reserved.

  18. Obstacles to implementation of an intervention to improve surgical services in an Ethiopian hospital: a qualitative study of an international health partnership project.

    PubMed

    Aveling, Emma-Louise; Zegeye, Desalegn Tegabu; Silverman, Michael

    2016-08-17

    Access to safe surgical care represents a critical gap in healthcare delivery and development in many low- and middle-income countries, including Ethiopia. Quality improvement (QI) initiatives at hospital level may contribute to closing this gap. Many such quality improvement initiatives are carried out through international health partnerships. Better understanding of how to optimise quality improvement in low-income settings is needed, including through partnership-based approaches. Drawing on a process evaluation of an intervention to improve surgical services in an Ethiopian hospital, this paper offers lessons to help meet this need. We conducted a qualitative process evaluation of a quality improvement project which aimed to improve access to surgical services in an Ethiopian referral hospital through better management. Data was collected longitudinally and included: 66 in-depth interviews with surgical staff and project team members; observation (135 h) in the surgery department and of project meetings; project-related documentation. Thematic analysis, guided by theoretical constructs, focused on identifying obstacles to implementation. The project largely failed to achieve its goals. Key barriers related to project design, partnership working and the implementation context, and included: confusion over project objectives and project and partner roles and responsibilities; logistical challenges concerning overseas visits; difficulties in communication; gaps between the time and authority team members had and that needed to implement and engage other staff; limited strategies for addressing adaptive-as opposed to technical-challenges; effects of hierarchy and resource scarcity on QI efforts. While many of the obstacles identified are common to diverse settings, our findings highlight ways in which some features of low-income country contexts amplify these common challenges. We identify lessons for optimising the design and planning of quality improvement interventions within such challenging healthcare contexts, with specific reference to international partnership-based approaches. These include: the need for a funded lead-in phase to clarify and agree goals, roles, mutual expectations and communication strategies; explicitly incorporating adaptive, as well as technical, solutions; transparent management of resources and opportunities; leadership which takes account of both formal and informal power structures; and articulating links between project goals and wider organisational interests.

  19. Analysis of architect’s performance indicators in project delivery process

    NASA Astrophysics Data System (ADS)

    Marisa, A.

    2018-03-01

    Architect as a professional in the construction industry should possess a good performance in project delivery process. As a design professional, architect has an important role to ensure that the process is well-conducted by delivering a high-quality product for the clients. Thus, analyzing architect’s performance indicators is crucial in the project delivery process. This study aims to analyze the relative importance of architect performance indicators in project delivery process among registered architects in North Sumatera, Indonesia. A total of five indicators that measure architect performance in project delivery process were identified and 110 completed questionnaires were obtained and used for data analysis. A relative importance index is used to rank the relative importance of architect performance indicators. Results indicate that focus on the clients is the most important indicator of architect performance in project delivery process. This study demonstrates project communication as one of crucial indicators perceived by the architects for measuring their performance, and fills a knowledge gap on the importance of identifying the most important indicator for measuring architect performance from their own perspectives which previous studies have overlooked to improve performance assessment in project delivery process.

  20. Improving ED specimen TAT using Lean Six Sigma.

    PubMed

    Sanders, Janet H; Karr, Tedd

    2015-01-01

    Lean and Six Sigma are continuous improvement methodologies that have garnered international fame for improving manufacturing and service processes. Increasingly these methodologies are demonstrating their power to also improve healthcare processes. The purpose of this paper is to discuss a case study for the application of Lean and Six Sigma tools in the reduction of turnaround time (TAT) for Emergency Department (ED) specimens. This application of the scientific methodologies uncovered opportunities to improve the entire ED to lab system for the specimens. This case study provides details on the completion of a Lean Six Sigma project in a 1,000 bed tertiary care teaching hospital. Six Sigma's Define, Measure, Analyze, Improve, and Control methodology is very similar to good medical practice: first, relevant information is obtained and assembled; second, a careful and thorough diagnosis is completed; third, a treatment is proposed and implemented; and fourth, checks are made to determine if the treatment was effective. Lean's primary goal is to do more with less work and waste. The Lean methodology was used to identify and eliminate waste through rapid implementation of change. The initial focus of this project was the reduction of turn-around-times for ED specimens. However, the results led to better processes for both the internal and external customers of this and other processes. The project results included: a 50 percent decrease in vials used for testing, a 50 percent decrease in unused or extra specimens, a 90 percent decrease in ED specimens without orders, a 30 percent decrease in complete blood count analysis (CBCA) Median TAT, a 50 percent decrease in CBCA TAT Variation, a 10 percent decrease in Troponin TAT Variation, a 18.2 percent decrease in URPN TAT Variation, and a 2-5 minute decrease in ED registered nurses rainbow draw time. This case study demonstrated how the quantitative power of Six Sigma and the speed of Lean worked in harmony to improve the blood draw process for a 1,000 bed tertiary care teaching hospital. The blood draw process is a standard process used in hospitals to collect blood chemistry and hematology information for clinicians. The methods used in this case study demonstrated valuable and practical applications of process improvement methodologies that can be used for any hospital process and/or service environment. While this is not the first case study that has demonstrated the use of continuous process improvement methodologies to improve a hospital process, it is unique in the way in which it utilizes the strength of the project focussed approach that adheres more to the structure and rigor of Six Sigma and relied less on the speed of lean. Additionally, the application of these methodologies in healthcare is emerging research.

  1. Fostering evidence-based quality improvement for patient-centered medical homes: Initiating local quality councils to transform primary care.

    PubMed

    Stockdale, Susan E; Zuchowski, Jessica; Rubenstein, Lisa V; Sapir, Negar; Yano, Elizabeth M; Altman, Lisa; Fickel, Jacqueline J; McDougall, Skye; Dresselhaus, Timothy; Hamilton, Alison B

    Although the patient-centered medical home endorses quality improvement principles, methods for supporting ongoing, systematic primary care quality improvement have not been evaluated. We introduced primary care quality councils at six Veterans Health Administration sites as an organizational intervention with three key design elements: (a) fostering interdisciplinary quality improvement leadership, (b) establishing a structured quality improvement process, and (c) facilitating organizationally aligned frontline quality improvement innovation. Our evaluation objectives were to (a) assess design element implementation, (b) describe implementation barriers and facilitators, and (c) assess successful quality improvement project completion and spread. We analyzed administrative records and conducted interviews with 85 organizational leaders. We developed and applied criteria for assessing design element implementation using hybrid deductive/inductive analytic techniques. All quality councils implemented interdisciplinary leadership and a structured quality improvement process, and all but one completed at least one quality improvement project and a toolkit for spreading improvements. Quality councils were perceived as most effective when service line leaders had well-functioning interdisciplinary communication. Matching positions within leadership hierarchies with appropriate supportive roles facilitated frontline quality improvement efforts. Two key resources were (a) a dedicated internal facilitator with project management, data collection, and presentation skills and (b) support for preparing customized data reports for identifying and addressing practice level quality issues. Overall, quality councils successfully cultivated interdisciplinary, multilevel primary care quality improvement leadership with accountability mechanisms and generated frontline innovations suitable for spread. Practice level performance data and quality improvement project management support were critical. In order to successfully facilitate systematic, sustainable primary care quality improvement, regional and executive health care system leaders should engage interdisciplinary practice level leadership in a priority-setting process that encourages frontline innovation and establish local structures such as quality councils to coordinate quality improvement initiatives, ensure accountability, and promote spread of best practices.

  2. Technical Writing in Hydrogeology.

    ERIC Educational Resources Information Center

    Tinker, John R., Jr.

    1986-01-01

    A project for Writing Across the Curriculum at the University of Wisconsin-Eau Claire is described as a method to relate the process of writing to the process of learning hydrology. The project focuses on an actual groundwater contamination case and is designed to improve the technical writing skills of students. (JN)

  3. The Virtual Intercultural Team Tool

    ERIC Educational Resources Information Center

    Rus, Calin

    2010-01-01

    This article describes the Virtual Intercultural Team Tool (VITT) and discusses its processes and benefits. VIIT is a virtual platform designed with the aim of assisting European project teams to improve intercultural communication and build on their cultural diversity for effective implementation of their projects. It is a process-focused tool,…

  4. 77 FR 61053 - Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... suggestions on improving customer service at the Internal Revenue Service. DATES: The meeting will be held... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION...

  5. 77 FR 21156 - Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-09

    ... suggestions on improving customer service at the Internal Revenue Service. DATES: The meeting will be held... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION...

  6. 77 FR 8328 - Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... suggestions on improving customer service at the Internal Revenue Service. DATES: The meeting will be held... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION...

  7. PSP, TSP, XP, CMMI...Eating the Alphabet Soup!

    DTIC Science & Technology

    2011-05-19

    Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other...4 Q tit t Continuous process improvement Organizational Performance Management Causal Analysis and Resolution Level Focus Process Areas Requirements...Project Management process standardization Risk management Decision Analysis and Resolution Product Integration 2 M d R i t t anage Basic Project

  8. NREL Algal Biofuels Projects and Partnerships

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2016-10-01

    This fact sheet highlights several algal biofuels research and development projects focused on improving the economics of the algal biofuels production process. These projects should serve as a foundation for the research efforts toward algae as a source of fuels and other chemicals.

  9. Sustainable Energy Solutions Task 3.0:Life-Cycle Database for Wind Energy Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Twomey, Janet M.

    2010-03-01

    The benefits of wind energy had previously been captured in the literature at an overview level with relatively low transparency or ability to understand the basis for that information. This has limited improvement and decision-making to larger questions such as wind versus other electrical sources (such as coal-fired plants). This research project has established a substantially different approach which is to add modular, high granularity life cycle inventory (lci) information that can be used by a wide range of decision-makers, seeking environmental improvement. Results from this project have expanded the understanding and evaluation of the underlying factors that can improvemore » both manufacturing processes and specifically wind generators. The use of life cycle inventory techniques has provided a uniform framework to understand and compare the full range of environmental improvement in manufacturing, hence the concept of green manufacturing. In this project, the focus is on 1. the manufacturing steps that transform materials and chemicals into functioning products 2. the supply chain and end-of-life influences of materials and chemicals used in industry Results have been applied to wind generators, but also impact the larger U.S. product manufacturing base. For chemicals and materials, this project has provided a standard format for each lci that contains an overview and description, a process flow diagram, detailed mass balances, detailed energy of unit processes, and an executive summary. This is suitable for integration into other life cycle databases (such as that at NREL), so that broad use can be achieved. The use of representative processes allows unrestricted use of project results. With the framework refined in this project, information gathering was initiated for chemicals and materials in wind generation. Since manufacturing is one of the most significant parts of the environmental domain for wind generation improvement, this project research has developed a fundamental approach. The emphasis was place on individual unit processes as an organizing framework to understand the life cycle of manufactured products. The rearrangement of unit processes provides an efficient and versatile means of understanding improved manufactured products such as wind generators. The taxonomy and structure of unit process lci were developed in this project. A series of ten unit process lci were developed to sample the major segments of the manufacturing unit process taxonomy. Technical and economic effectiveness has been a focus of the project research in Task three. The use of repeatable modules for the organization of information on environmental improvement has a long term impact. The information developed can be used and reused in a variety of manufacturing plants and for a range of wind generator sizes and designs. Such a modular approach will lower the cost of life cycle analysis, that is often asked questions of carbon footprint, environmental impact, and sustainability. The use of a website for dissemination, linked to NREL, adds to the economic benefit as more users have access to the lci information. Benefit to the public has been achieved by a well-attended WSU conference, as well as presentations for the Kansas Wind Energy Commission. Attendees represented public interests, land owners, wind farm developers, those interested in green jobs, and industry. Another benefit to the public is the start of information flow from manufacturers that can inform individuals about products.« less

  10. Utilizing Lean Six Sigma Methodology to Improve the Authored Works Command Approval Process at Naval Medical Center San Diego.

    PubMed

    Valdez, Michelle M; Liwanag, Maureen; Mount, Charles; Rodriguez, Rechell; Avalos-Reyes, Elisea; Smith, Andrew; Collette, David; Starsiak, Michael; Green, Richard

    2018-03-14

    Inefficiencies in the command approval process for publications and/or presentations negatively impact DoD Graduate Medical Education (GME) residency programs' ability to meet ACGME scholarly activity requirements. A preliminary review of the authored works approval process at Naval Medical Center San Diego (NMCSD) disclosed significant inefficiency, variation in process, and a low level of customer satisfaction. In order to facilitate and encourage scholarly activity at NMCSD, and meet ACGME requirements, the Executive Steering Council (ESC) chartered an interprofessional team to lead a Lean Six Sigma (LSS) Rapid Improvement Event (RIE) project. Two major outcome metrics were identified: (1) the number of authored works submissions containing all required signatures and (2) customer satisfaction with the authored works process. Primary metric baseline data were gathered utilizing a Clinical Investigations database tracking publications and presentations. Secondary metric baseline data were collected via a customer satisfaction survey to GME faculty and residents. The project team analyzed pre-survey data and utilized LSS tools and methodology including a "gemba" (environment) walk, cause and effect diagram, critical to quality tree, voice of the customer, "muda" (waste) chart, and a pre- and post-event value stream map. The team selected an electronic submission system as the intervention most likely to positively impact the RIE project outcome measures. The number of authored works compliant with all required signatures improved from 52% to 100%. Customer satisfaction rated as "completely or mostly satisfied" improved from 24% to 97%. For both outcomes, signature compliance and customer satisfaction, statistical significance was achieved with a p < 0.0001. This RIE project utilized LSS methodology and tools to improve signature compliance and increase customer satisfaction with the authored works approval process, leading to 100% signature compliance, a comprehensive longitudinal repository of all authored work requests, and a 97% "completely or mostly satisfied" customer rating of the process.

  11. Evaluation of nurse engagement in evidence-based practice.

    PubMed

    Davidson, Judy E; Brown, Caroline

    2014-01-01

    The purpose of this project was to explore nurses' willingness to question and change practice. Nurses were invited to report practice improvement opportunities, and participants were supported through the process of a practice change. The project leader engaged to the extent desired by the participant. Meetings proceeded until the participant no longer wished to continue, progress was blocked, or practice was changed. Evaluation of the evidence-based practice change process occurred. Fifteen nurses reported 23 practice improvement opportunities. The majority (12 of 15) preferred to have the project leader review the evidence. Fourteen projects changed practice; 4 were presented at conferences. Multiple barriers were identified throughout the process and included loss of momentum, the proposed change involved other disciplines, and low level or controversial evidence. Practice issues were linked to quality metrics, cost of care, patient satisfaction, regulatory compliance, and patient safety. Active engagement by nurse leaders was needed for a practice change to occur. Participants identified important problems previously unknown to hospital administrators. The majority of nurses preferred involvement in practice change based on clinical problem solving when supported by others to provide literature review and manage the process through committees. Recommendations include supporting a culture that encourages employees to report practice improvement opportunities and provide resources to assist in navigating the identified practice change.

  12. Quality Matters™: An Educational Input in an Ongoing Design-Based Research Project

    ERIC Educational Resources Information Center

    Adair, Deborah; Shattuck, Kay

    2015-01-01

    Quality Matters (QM) has been transforming established best practices and online education-based research into an applicable, scalable course level improvement process for the last decade. In this article, the authors describe QM as an ongoing design-based research project and an educational input for improving online education.

  13. The prioritization of mobility improvements using a multicriteria prioritization algorithm : final report

    DOT National Transportation Integrated Search

    1998-07-01

    A prioritization process has been prepared by the University of California, Davis, for use by the Oregon Department of Transportation (ODOT) in selecting multimodal mobility improvement projects to fund, given a budget constraint. The process involve...

  14. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    NASA Technical Reports Server (NTRS)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  15. Creating Sustainable Education Projects in Roatán, Honduras through Continuous Process Improvement

    ERIC Educational Resources Information Center

    Raven, Arjan; Randolph, Adriane B.; Heil, Shelli

    2010-01-01

    The investigators worked together with permanent residents of Roatán, Honduras on sustainable initiatives to help improve the island's troubled educational programs. Our initiatives focused on increasing the number of students eligible and likely to attend a university. Using a methodology based in continuous process improvement, we developed…

  16. System design and improvement of an emergency department using Simulation-Based Multi-Objective Optimization

    NASA Astrophysics Data System (ADS)

    Goienetxea Uriarte, A.; Ruiz Zúñiga, E.; Urenda Moris, M.; Ng, A. H. C.

    2015-05-01

    Discrete Event Simulation (DES) is nowadays widely used to support decision makers in system analysis and improvement. However, the use of simulation for improving stochastic logistic processes is not common among healthcare providers. The process of improving healthcare systems involves the necessity to deal with trade-off optimal solutions that take into consideration a multiple number of variables and objectives. Complementing DES with Multi-Objective Optimization (SMO) creates a superior base for finding these solutions and in consequence, facilitates the decision-making process. This paper presents how SMO has been applied for system improvement analysis in a Swedish Emergency Department (ED). A significant number of input variables, constraints and objectives were considered when defining the optimization problem. As a result of the project, the decision makers were provided with a range of optimal solutions which reduces considerably the length of stay and waiting times for the ED patients. SMO has proved to be an appropriate technique to support healthcare system design and improvement processes. A key factor for the success of this project has been the involvement and engagement of the stakeholders during the whole process.

  17. Advanced Information Processing. Volume II. Instructor's Materials. Curriculum Improvement Project. Region II.

    ERIC Educational Resources Information Center

    Stanford, Linda

    This course curriculum is intended for use by community college insructors and administrators in implementing an advanced information processing course. It builds on the skills developed in the previous information processing course but goes one step further by requiring students to perform in a simulated office environment and improve their…

  18. Turning Schools Around: The National Board Certification Process as a School Improvement Strategy

    ERIC Educational Resources Information Center

    Jaquith, Ann; Snyder, Jon

    2016-01-01

    Can the National Board certification process support school improvement where large proportions of students score below grade level on standardized tests? This SCOPE study examines a project that sought to seize and capitalize upon the learning opportunities embedded in the National Board certification process, particularly opportunities to learn…

  19. Turning Schools Around: The National Board Certification Process as a School Improvement Strategy. Research Brief

    ERIC Educational Resources Information Center

    Jaquith, Ann; Snyder, Jon

    2016-01-01

    Can the National Board certification process support school improvement where large proportions of students score below grade level on standardized tests? This SCOPE study examines a project that sought to seize and capitalize upon the learning opportunities embedded in the National Board certification process, particularly opportunities to learn…

  20. Research on construction quality and improvement of assembly construction

    NASA Astrophysics Data System (ADS)

    Cheng, Fei

    2017-11-01

    Based on the acceleration of the urbanization process and the improvement of the quality of life of our residents, the demand for building construction has been increasing. In this context, the construction industry in order to promote the construction efficiency, quality improvement, to meet the needs of the development of the times to strengthen the new technology, the use of new technologies. At present, China’s engineering construction units in the process of carrying out the project to strengthen the use of assembly-type construction technology, which thus achieved for the traditional construction work low-level, high time-consuming issues, and promote the steady improvement of production efficiency. Based on this, this paper focuses on the analysis of the connotation of the assembly structure and analyzes the quality problems in the construction process of the construction projects and puts forward the improvement measures to promote the improvement of the building quality and the construction of the building Construction speed. Based on this, this paper analyzes the structural system and design of prefabricated building.

  1. Spreading a medication administration intervention organizationwide in six hospitals.

    PubMed

    Kliger, Julie; Singer, Sara; Hoffman, Frank; O'Neil, Edward

    2012-02-01

    Six hospitals from the San Francisco Bay Area participated in a 12-month quality improvement project conducted by the Integrated Nurse Leadership Program (INLP). A quality improvement intervention that focused on improving medication administration accuracy was spread from two pilot units to all inpatient units in the hospitals. INLP developed a 12-month curriculum, presented in a combination of off-site training sessions and hospital-based training and consultant-led meetings, to teach clinicians the key skills needed to drive organizationwide change. Each hospital established a nurse-led project team, as well as unit teams to address six safety processes designed to improve medication administration accuracy: compare medication to the medication administration record; keep medication labeled throughout; check two patient identifications; explain drug to patient (if applicable); chart immediately after administration; and protect process from distractions and interruptions. From baseline until one year after project completion, the six hospitals improved their medication accuracy rates, on average, from 83.4% to 98.0% in the spread units. The spread units also improved safety processes overall from 83.1% to 97.2%. During the same time, the initial pilot units also continued to improve accuracy from 94.0% to 96.8% and safety processes overall from 95.3% to 97.2%. With thoughtful planning, engaging those doing the work early and focusing on the "human side of change" along with technical knowledge of improvement methodologies, organizations can spread initiatives enterprisewide. This program required significant training of frontline workers in problem-solving skills, leading change, team management, data tracking, and communication.

  2. Cultivation of students' engineering designing ability based on optoelectronic system course project

    NASA Astrophysics Data System (ADS)

    Cao, Danhua; Wu, Yubin; Li, Jingping

    2017-08-01

    We carry out teaching based on optoelectronic related course group, aiming at junior students majored in Optoelectronic Information Science and Engineering. " Optoelectronic System Course Project " is product-designing-oriented and lasts for a whole semester. It provides a chance for students to experience the whole process of product designing, and improve their abilities to search literature, proof schemes, design and implement their schemes. In teaching process, each project topic is carefully selected and repeatedly refined to guarantee the projects with the knowledge integrity, engineering meanings and enjoyment. Moreover, we set up a top team with professional and experienced teachers, and build up learning community. Meanwhile, the communication between students and teachers as well as the interaction among students are taken seriously in order to improve their team-work ability and communicational skills. Therefore, students are not only able to have a chance to review the knowledge hierarchy of optics, electronics, and computer sciences, but also are able to improve their engineering mindset and innovation consciousness.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eshraghi, Ray

    In September 2008, the U.S. Department of Energy and Martin County Economic Development Corporation entered into an agreement to further the advancement of a microtubular PEM fuel cell developed by Microcell Corporation. The overall focus of this project was on research and development related to high volume manufacturing of fuel cells and cost reduction in the fuel cell manufacturing process. The extrusion process used for the microfiber fuel cells in this project is inherently a low cost, high volume, high speed manufacturing process. In order to take advantage of the capabilities that the extrusion process provides, all subsequent manufacturing processesmore » must be enhanced to meet the extrusion line’s speed and output. Significant research and development was completed on these subsequent processes to ensure that power output and performance were not negatively impacted by the higher speeds, design changes and process improvements developed in this project. All tasks were successfully completed resulting in cost reductions, performance improvements and process enhancements in the areas of speed and quality. These results support the Department of Energy’s goal of fuel cell commercialization.« less

  4. Advanced Turbine Technology Applications Project (ATTAP)

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Reports technical effort by AlliedSignal Engines in sixth year of DOE/NASA funded project. Topics include: gas turbine engine design modifications of production APU to incorporate ceramic components; fabrication and processing of silicon nitride blades and nozzles; component and engine testing; and refinement and development of critical ceramics technologies, including: hot corrosion testing and environmental life predictive model; advanced NDE methods for internal flaws in ceramic components; and improved carbon pulverization modeling during impact. ATTAP project is oriented toward developing high-risk technology of ceramic structural component design and fabrication to carry forward to commercial production by 'bridging the gap' between structural ceramics in the laboratory and near-term commercial heat engine application. Current ATTAP project goal is to support accelerated commercialization of advanced, high-temperature engines for hybrid vehicles and other applications. Project objectives are to provide essential and substantial early field experience demonstrating ceramic component reliability and durability in modified, available, gas turbine engine applications; and to scale-up and improve manufacturing processes of ceramic turbine engine components and demonstrate application of these processes in the production environment.

  5. Development of low-cost technology for the next generation of high efficiency solar cells composed of earth abundant elements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agrawal, Rakesh

    2014-09-28

    The development of renewable, affordable, and environmentally conscious means of generating energy on a global scale represents a grand challenge of our time. Due to the “permanence” of radiation from the sun, solar energy promises to remain a viable and sustainable power source far into the future. Established single-junction photovoltaic technologies achieve high power conversion efficiencies (pce) near 20% but require complicated manufacturing processes that prohibit the marriage of large-scale throughput (e.g. on the GW scale), profitability, and quality control. Our approach to this problem begins with the synthesis of nanocrystals of semiconductor materials comprising earth abundant elements and characterizedmore » by material and optoelectronic properties ideal for photovoltaic applications, namely Cu2ZnSn(S,Se)4 (CZTSSe). Once synthesized, such nanocrystals are formulated into an ink, coated onto substrates, and processed into completed solar cells in such a way that enables scale-up to high throughput, roll-to-roll manufacturing processes. This project aimed to address the major limitation to CZTSSe solar cell pce’s – the low open-circuit voltage (Voc) reported throughout literature for devices comprised of this material. Throughout the project significant advancements have been made in fundamental understanding of the CZTSSe material and device limitations associated with this material system. Additionally, notable improvements have been made to our nanocrystal based processing technique to alleviate performance limitations due to the identified device limitations. Notably, (1) significant improvements have been made in reducing intra- and inter-nanoparticle heterogeneity, (2) improvements in device performance have been realized with novel cation substitution in Ge-alloyed CZTGeSSe absorbers, (3) systematic analysis of absorber sintering has been conducted to optimize the selenization process for large grain CZTSSe absorbers, (4) novel electrical characterization analysis techniques have been developed to identify significant limitations to traditional electrical characterization of CZTSSe devices, and (5) the developed electrical analysis techniques have been used to identify the role that band gap and electrostatic potential fluctuations have in limiting device performance for this material system. The device modeling and characterization of CZTSSe undertaken with this project have significant implications for the CZTSSe research community, as the identified limitations due to potential fluctuations are expected to be a performance limitation to high-efficiency CZTSSe devices fabricated from all current processing techniques. Additionally, improvements realized through enhanced absorber processing conditions to minimize nanoparticle and large-grain absorber heterogeneity are suggested to be beneficial processing improvements which should be applied to CZTSSe devices fabricated from all processing techniques. Ultimately, our research has indicated that improved performance for CZTSSe will be achieved through novel absorber processing which minimizes defect formation, elemental losses, secondary phase formation, and compositional uniformity in CZTSSe absorbers; we believe this novel absorber processing can be achieved through nanocrystal based processing of CZTSSe which is an active area of research at the conclusion of this award. While significant fundamental understanding of CZTSSe and the performance limitations associated with this material system, as well as notable improvements in the processing of nanocrystal based CZTSSe absorbers, have been achieved under this project, the limitation of two years of research funding towards our goals prevents further significant advancements directly identified through pce. improvements relative to those reported herein. As the characterization and modeling subtask of this project has been the main driving force for understanding device limitations, the conclusions of this analysis have just recently been applied to the processing of nanocrystal based CZTSSe absorbers -- with notable success. We expect the notable fundamental understanding of device limitations and absorber sintering achieved under this project will lead to significant improvements in device performance for CZTSSe devices in the near future for devices fabricated from a variety of processing techniques« less

  6. Useful Life Prediction for Payload Carrier Hardware

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2002-01-01

    The Space Shuttle has been identified for use through 2020. Payload carrier systems will be needed to support missions through the same time frame. To support the future decision making process with reliable systems, it is necessary to analyze design integrity, identify possible sources of undesirable risk and recognize required upgrades for carrier systems. This project analyzed the information available regarding the carriers and developed the probability of becoming obsolete under different scenarios. In addition, this project resulted in a plan for an improved information system that will improve monitoring and control of the various carriers. The information collected throughout this project is presented in this report as process flow, historical records, and statistical analysis.

  7. Characterising and improving the performance of the Sentinel-3 SRAL altimeter: A Report from SCOOP, SHAPE & SPICE Projects

    NASA Astrophysics Data System (ADS)

    Restano, Marco; Ambrózio, Américo; Cotton, David; Scoop Team; Fabry, Pierre; Shape Team; McMillan, Malcolm; Spice Team; Benveniste, Jérôme

    2017-04-01

    Under the ESA Scientific Exploitation of Operational Missions (SEOM) Programme, 3 Projects are currently underway to accurately characterise and improve the performance of the Sentinel-3 SRAL SAR mode altimeter. They are: 1) SCOOP (SAR Altimetry Coastal & Open Ocean Performance Exploitation and Roadmap Study) for Coastal and Open Ocean; 2) SHAPE (Sentinel-3 Hydrologic Altimetry PrototypE) for Inland Water; 3) SPICE (Sentinel-3 Performance improvement for ICE sheets) for Ice Sheets. As projects started before the launch of Sentinel-3 (a full SAR mission), calibrated Cryosat-2 data have been used as input to a processor replicating the Sentinel-3 baseline processing. For the SCOOP project, a first test dataset has been released to end users including data from 10 regions of interest. The successful SAMOSA retracker, adopted in the previous CP4O Project (CryoSat Plus for Oceans), has been readapted to re-track Sentinel-3 waveforms. An improved version of SAMOSA will be released at the end of the project. The SHAPE project is working towards the design and assessment of alternative/innovative techniques not implemented in the Sentinel-3 ground segment (performing no Inland Water dedicated processing). Both rivers and lakes will be studied. Amazon, Brahmaputra and Danube have been selected as rivers, whereas Titicaca and Vanern have been chosen as lakes. The study will include the assimilation of output products into hydrological models for all regions of interest. A final dataset will be provided to end users. The SPICE project is addressing four high level objectives: 1) Assess and improve the Delay-Doppler altimeter processing for ice sheets. 2) Assess and develop SAR waveform retrackers for ice sheets. 3) Evaluate the performance of SAR altimetry relative to conventional pulse limited altimetry. 4) Assess the impact on SAR altimeter measurements of radar wave interaction with the snowpack. Dataset used for validation include ICESat and IceBridge products. Vostok, Dome C and the Spirit Sector (all located in Antarctica) have been selected, along with the Russell Glacier in Greenland, as regions of interest. In the frame of both SCOOP and SHAPE projects, improved wet troposphere corrections will be estimated for all regions of interest.

  8. Project delivery acceleration tool box : improvements to the Department of Transportation's project delivery process.

    DOT National Transportation Integrated Search

    2004-05-01

    The purpose of this document is to provide to Caltrans' employees, as well as external partners, some valuable tools that can be used to help accelerate project delivery. This document contains a compilation of all the Department's recent acceleratio...

  9. Improving Self Service the Six Sigma Way at Newcastle University Library

    ERIC Educational Resources Information Center

    Kumi, Susan; Morrow, John

    2006-01-01

    Purpose: To report on the collaborative project between Newcastle University Library and 3M which aimed to increase self-issue levels using six sigma methodology. Design/methodology/approach: The six-month long project is outlined and gives an insight into the process improvement methodology called six sigma. An explanation of why we ran the…

  10. Improving a Dental School's Clinic Operations Using Lean Process Improvement.

    PubMed

    Robinson, Fonda G; Cunningham, Larry L; Turner, Sharon P; Lindroth, John; Ray, Deborah; Khan, Talib; Yates, Audrey

    2016-10-01

    The term "lean production," also known as "Lean," describes a process of operations management pioneered at the Toyota Motor Company that contributed significantly to the success of the company. Although developed by Toyota, the Lean process has been implemented at many other organizations, including those in health care, and should be considered by dental schools in evaluating their clinical operations. Lean combines engineering principles with operations management and improvement tools to optimize business and operating processes. One of the core concepts is relentless elimination of waste (non-value-added components of a process). Another key concept is utilization of individuals closest to the actual work to analyze and improve the process. When the medical center of the University of Kentucky adopted the Lean process for improving clinical operations, members of the College of Dentistry trained in the process applied the techniques to improve inefficient operations at the Walk-In Dental Clinic. The purpose of this project was to reduce patients' average in-the-door-to-out-the-door time from over four hours to three hours within 90 days. Achievement of this goal was realized by streamlining patient flow and strategically relocating key phases of the process. This initiative resulted in patient benefits such as shortening average in-the-door-to-out-the-door time by over an hour, improving satisfaction by 21%, and reducing negative comments by 24%, as well as providing opportunity to implement the electronic health record, improving teamwork, and enhancing educational experiences for students. These benefits were achieved while maintaining high-quality patient care with zero adverse outcomes during and two years following the process improvement project.

  11. A Structured Process Description of a Pragmatic Implementation Project: Improving Integrated Care for Older Persons in Residential Care Homes

    PubMed Central

    Poot, Antonius J.; de Waard, Claudia S.; Wind, Annet W.; Caljouw, Monique A. A.; Gussekloo, Jacobijn

    2017-01-01

    Evaluation of the implementation of integrated care can differ from trial-based research due to complexity. Therefore, we examined whether a theory-based method for process description of implementation can contribute to improvement of evidence-based care. MOVIT, a Dutch project aimed at implementing integrated care for older vulnerable persons in residential care homes, was used as a case study. The project activities were defined according to implementation taxonomy and mapped in a matrix of theoretical levels and domains. Project activities mainly targeted professionals (both individual and group). A few activities targeted the organizational level, whereas none targeted the policy level, or the patient, or the “social, political, and legal” domains. However, the resulting changes in care delivery arrangement had consequences for professionals, patients, organizations, and the social, political, and legal domains. A structured process description of a pragmatic implementation project can help assess the fidelity and quality of the implementation, and identify relevant contextual factors for immediate adaptation and future research. The description showed that, in the MOVIT project, there was a discrepancy between the levels and domains targeted by the implementation activities and those influenced by the resulting changes in delivery arrangement. This could have influenced, in particular, the adoption and sustainability of the project. PMID:29161944

  12. A Structured Process Description of a Pragmatic Implementation Project: Improving Integrated Care for Older Persons in Residential Care Homes.

    PubMed

    Poot, Antonius J; de Waard, Claudia S; Wind, Annet W; Caljouw, Monique A A; Gussekloo, Jacobijn

    2017-01-01

    Evaluation of the implementation of integrated care can differ from trial-based research due to complexity. Therefore, we examined whether a theory-based method for process description of implementation can contribute to improvement of evidence-based care. MOVIT, a Dutch project aimed at implementing integrated care for older vulnerable persons in residential care homes, was used as a case study. The project activities were defined according to implementation taxonomy and mapped in a matrix of theoretical levels and domains. Project activities mainly targeted professionals (both individual and group). A few activities targeted the organizational level, whereas none targeted the policy level, or the patient, or the "social, political, and legal" domains. However, the resulting changes in care delivery arrangement had consequences for professionals, patients, organizations, and the social, political, and legal domains. A structured process description of a pragmatic implementation project can help assess the fidelity and quality of the implementation, and identify relevant contextual factors for immediate adaptation and future research. The description showed that, in the MOVIT project, there was a discrepancy between the levels and domains targeted by the implementation activities and those influenced by the resulting changes in delivery arrangement. This could have influenced, in particular, the adoption and sustainability of the project.

  13. Project management - Factors leading to success or failure

    NASA Technical Reports Server (NTRS)

    Kelley, A. J.; Murphy, D. C.

    1974-01-01

    This paper presents initial findings of a study designed to detail the relationships among situational, structural, and process variables as they relate to project effectiveness. In the paper, emphasis is placed on delineating those variables which tend to improve and those which tend to impede project effectiveness.

  14. How to Sustain Change and Support Continuous Quality Improvement

    PubMed Central

    McQuillan, Rory; Harel, Ziv; Weizman, Adam V.; Thomas, Alison; Nesrallah, Gihad; Bell, Chaim M.; Chan, Christopher T.; Chertow, Glenn M.

    2016-01-01

    To achieve sustainable change, quality improvement initiatives must become the new way of working rather than something added on to routine clinical care. However, most organizational change is not maintained. In this next article in this Moving Points in Nephrology feature on quality improvement, we provide health care professionals with strategies to sustain and support quality improvement. Threats to sustainability may be identified both at the beginning of a project and when it is ready for implementation. The National Health Service Sustainability Model is reviewed as one example to help identify issues that affect long-term success of quality improvement projects. Tools to help sustain improvement include process control boards, performance boards, standard work, and improvement huddles. Process control and performance boards are methods to communicate improvement results to staff and leadership. Standard work is a written or visual outline of current best practices for a task and provides a framework to ensure that changes that have improved patient care are consistently and reliably applied to every patient encounter. Improvement huddles are short, regular meetings among staff to anticipate problems, review performance, and support a culture of improvement. Many of these tools rely on principles of visual management, which are systems transparent and simple so that every staff member can rapidly distinguish normal from abnormal working conditions. Even when quality improvement methods are properly applied, the success of a project still depends on contextual factors. Context refers to aspects of the local setting in which the project operates. Context affects resources, leadership support, data infrastructure, team motivation, and team performance. For these reasons, the same project may thrive in a supportive context and fail in a different context. To demonstrate the practical applications of these quality improvement principles, these principles are applied to a hypothetical quality improvement initiative that aims to promote home dialysis (home hemodialysis and peritoneal dialysis). PMID:27016498

  15. Use of Process Improvement Tools in Radiology.

    PubMed

    Rawson, James V; Kannan, Amogha; Furman, Melissa

    2016-01-01

    Process improvement techniques are common in manufacturing and industry. Over the past few decades these principles have been slowly introduced in select health care settings. This article reviews the Plan, Do, Study, and Act cycle, Six Sigma, the System of Profound Knowledge, Lean, and the theory of constraints. Specific process improvement tools in health care and radiology are presented in the order the radiologist is likely to encounter them in an improvement project. Copyright © 2015 Mosby, Inc. All rights reserved.

  16. Ice2sea - the future glacial contribution to sea-level rise

    NASA Astrophysics Data System (ADS)

    Vaughan, D. G.; Ice2sea Consortium

    2009-04-01

    The melting of continental ice (glaciers, ice caps and ice sheets) is a substantial source of current sea-level rise, and one that is accelerating more rapidly than was predicted even a few years ago. Indeed, the most recent report from Intergovernmental Panel on Climate Change highlighted that the uncertainty in projections of future sea-level rise is dominated by uncertainty concerning continental ice, and that understanding of the key processes that will lead to loss of continental ice must be improved before reliable projections of sea-level rise can be produced. Such projections are urgently required for effective sea-defence management and coastal adaptation planning. Ice2sea is a consortium of European institutes and international partners seeking European funding to support an integrated scientific programme to improve understanding concerning the future glacial contribution to sea-level rise. This includes improving understanding of the processes that control, past, current and future sea-level rise, and generation of improved estimates of the contribution of glacial components to sea-level rise over the next 200 years. The programme will include targeted studies of key processes in mountain glacier systems and ice caps (e.g. Svalbard), and in ice sheets in both polar regions (Greenland and Antarctica) to improve understanding of how these systems will respond to future climate change. It will include fieldwork and remote sensing studies, and develop a suite of new, cross-validated glacier and ice-sheet model. Ice2sea will deliver these results in forms accessible to scientists, policy-makers and the general public, which will include clear presentations of the sources of uncertainty. Our aim is both, to provide improved projections of the glacial contribution to sea-level rise, and to leave a legacy of improved tools and techniques that will form the basis of ongoing refinements in sea-level projection. Ice2sea will provide exciting opportunities for many early-career glaciologists and ice-modellers in a variety of host institutes.

  17. The Lunar Phases Project: A Mental Model-Based Observational Project for Undergraduate Nonscience Majors

    ERIC Educational Resources Information Center

    Meyer, Angela Osterman; Mon, Manuel J.; Hibbard, Susan T.

    2011-01-01

    We present our Lunar Phases Project, an ongoing effort utilizing students' actual observations within a mental model building framework to improve student understanding of the causes and process of the lunar phases. We implement this project with a sample of undergraduate, nonscience major students enrolled in a midsized public university located…

  18. Advanced Information Processing. Volume I. Student's Materials. Curriculum Improvement Project. Region II.

    ERIC Educational Resources Information Center

    Stanford, Linda

    This course curriculum is intended for use in an advanced information processing course. It builds on the skills developed in the previous information processing course but goes one step further by requiring students to perform in a simulated office environment and improve their decision-making skills. This volume contains two parts of the…

  19. Measurements and modeling of CO 2 concentration and isotopes to improve process-level understanding of Arctic and boreal carbon cycling. Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keeling, Ralph F.

    The major goal of this project was to improve understanding of processes that control the exchanges of CO 2 between the atmosphere and the land biosphere on decadal and longer time scales. The approach involves measuring the changes in atmospheric CO 2 concentration and the isotopes of CO 2 ( 13C/ 12C and 18O/ 16O) at background stations and uses these and other datasets to challenge and improve numerical models of the earth system. The project particularly emphasized the use of these data to improve understanding of changes occurring in boreal and arctic ecosystems over the past 50 years andmore » to seek from these data improved understanding of large-scale processes impacting carbon cycling, such as the responses to warming, CO 2 fertilization, and disturbance. The project also led to advances in the understanding of changes in water-use efficiency of land ecosystems globally based on trends in 13C/ 12C. The core element of this project was providing partial support for continuing measurements of CO 2 concentrations and isotopes from the Scripps CO 2 program, initiated by C. D. Keeling in the 1960s. The measurements included analysis of flasks collected at an array of ten stations distributed from the Arctic to the Antarctic. The project also supported modeling studies and interpretive work to help understand the origins of the large ~50% increase in the amplitude of the atmospheric CO 2 cycle detected at high northern latitudes between 1960 and present and to understand the long-term trend in carbon 13C/ 12C of CO 2. The seasonal cycle work was advanced through collaborations with colleagues at MPI Jena and Imperial College« less

  20. Faster, better, cheaper: lean labs are the key to future survival.

    PubMed

    Bryant, Patsy M; Gulling, Richard D

    2006-03-28

    Process improvement techniques have been used in manufacturing for many years to rein in costs and improve quality. Health care is now grappling with similar challenges. The Department of Laboratory Services at Good Samaritan Hospital, a 560-bed facility in Dayton, OH, used the Lean process improvement method in a 12-week project to streamline its core laboratory processes. By analyzing the flow of samples through the system and identifying value-added and non-value-added steps, both in the laboratory and during the collection process, Good Samaritan's project team redesigned systems and reconfigured the core laboratory layout to trim collection-to-results time from 65 minutes to 40 minutes. As a result, virtually all morning results are available to physicians by 7 a.m., critical values are called to nursing units within 30 minutes, and core laboratory services are optimally staffed for maximum cost-effectiveness.

  1. The PATH project in eight European countries: an evaluation.

    PubMed

    Veillard, Jeremy Henri Maurice; Schiøtz, Michaela Louise; Guisset, Ann-Lise; Brown, Adalsteinn Davidson; Klazinga, Niek S

    2013-01-01

    This paper's aim is to evaluate the perceived impact and the enabling factors and barriers experienced by hospital staff participating in an international hospital performance measurement project focused on internal quality improvement. Semi-structured interviews involving international hospital performance measurement project coordinators, including 140 hospitals from eight European countries (Belgium, Estonia, France, Germany, Hungary, Poland, Slovakia and Slovenia). Inductively analyzing the interview transcripts was carried out using the grounded theory approach. Even when public reporting is absent, the project was perceived as having stimulated performance measurement and quality improvement initiatives in participating hospitals. Attention should be paid to leadership/ownership, context, content (project intrinsic features) and processes supporting elements. Generalizing the findings is limited by the study's small sample size. Possible implications for the WHO European Regional Office and for participating hospitals would be to assess hospital preparedness to participate in the PATH project, depending on context, process and structural elements; and enhance performance and practice benchmarking through suggested approaches. This research gathered rich and unique material related to an international performance measurement project. It derived actionable findings.

  2. Environmental assessment in slum improvement programs: Some evidence from a study on infrastructure projects in two Dhaka slums

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chowdhury, Farhat Jahan; Amin, A.T.M. Nurul

    2006-08-15

    This paper reports findings from a study on slum improvement projects to show the difference that environmental assessment (EA) can make in such interventions and to suggest mechanisms for its integration into such projects. The findings are based on a field survey that was carried out in two slums of Dhaka where infrastructure projects were implemented. In one slum, the EA process was considered in designing and locating infrastructure and in the other it was not. The survey results traced the severe problems that existed in both slums before the implementation of infrastructure improvement projects and reveal that after themore » intervention the situation has considerably improved in the slum where EA was conducted. In contrast, some problems still persist in the other slum where EA was not considered. To make it worse, the newly built infrastructures have even given rise to a set of new problems. In order to avoid such negative outcomes from development interventions, the paper finally develops the mechanism for integration of EA into slum improvement project.« less

  3. Issues in NASA Program and Project Management. Special Edition: A Collection of Papers on NASA Procedures and Guidance 7120.5A. Volume 14

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1998-01-01

    A key aspect of NASA's new Strategic Management System is improving the way we plan, approve, execute and evaluate our programs and projects. To this end, NASA has developed the NASA Program and Project Management processes and Requirements-NASA Procedures and Guidelines (NPG) 7120.5A, which formally documents the "Provide Aerospace Products and Capabilities" crosscutting process, and defines the processes and requirements that are responsive to the Program/Project Management-NPD 7120.4A. The Program/Project Management-NPD 7120.4A, issued November 14, 1996, provides the policy for managing programs and projects in a new way that is aligned with the new NASA environment. An Agencywide team has spent thousands of hours developing the NASA Program and Project Management Processes and Requirements-NPG 7120.5A. We have created significant flexibility, authority and discretion for the program and project managers to exercise and carry out their duties, and have delegated the responsibility and the accountability for their programs and projects.

  4. Initial Intervention Outcomes of the Dependable Strengths Project.

    ERIC Educational Resources Information Center

    McMurrer, James E., Jr.

    Dependable Strengths Articulation Process (DSAP) is a self-development process designed to facilitate positive self-constructions and improved personal functioning. This study examined the effectiveness of DSAP interventions. Participants (N=30) were college graduates who had expressed a desire to improve their educational and career planning and…

  5. Improvement Guides for I.A. Curriculum

    ERIC Educational Resources Information Center

    Ritz, John M.; Wright, Lawrence S.

    1977-01-01

    Describes a project to revise "The Wisconsin Guide to Local Curriculum Improvement in Industrial Education, K-12", originally prepared in 1973. Four figures from the guide are included: (1) model of a field objective, (2) curriculum planning model, (3) instructional development process, and (4) process for developing objectives. (MF)

  6. Does Documenting the Regulation Process on a Blog Enhance Pre-Service Teachers' Self- and Co-Regulation in a Collaborative Project?

    ERIC Educational Resources Information Center

    Cho, Moon-Heum; Lim, Seongmi; Lee, Kyeonghwa

    2017-01-01

    Students often complain about unsatisfactory experiences resulting from disproportionate contributions to collaborative projects. To improve the experience, we applied regulation theory to design a process to document regulation on a blog and examined whether such documentation enhanced students' self-regulation and co-regulation skills while…

  7. Mathematics authentic assessment on statistics learning: the case for student mini projects

    NASA Astrophysics Data System (ADS)

    Fauziah, D.; Mardiyana; Saputro, D. R. S.

    2018-03-01

    Mathematics authentic assessment is a form of meaningful measurement of student learning outcomes for the sphere of attitude, skill and knowledge in mathematics. The construction of attitude, skill and knowledge achieved through the fulfilment of tasks which involve active and creative role of the students. One type of authentic assessment is student mini projects, started from planning, data collecting, organizing, processing, analysing and presenting the data. The purpose of this research is to learn the process of using authentic assessments on statistics learning which is conducted by teachers and to discuss specifically the use of mini projects to improving students’ learning in the school of Surakarta. This research is an action research, where the data collected through the results of the assessments rubric of student mini projects. The result of data analysis shows that the average score of rubric of student mini projects result is 82 with 96% classical completeness. This study shows that the application of authentic assessment can improve students’ mathematics learning outcomes. Findings showed that teachers and students participate actively during teaching and learning process, both inside and outside of the school. Student mini projects also provide opportunities to interact with other people in the real context while collecting information and giving presentation to the community. Additionally, students are able to exceed more on the process of statistics learning using authentic assessment.

  8. “Using Statistical Comparisons between SPartICus Cirrus Microphysical Measurements, Detailed Cloud Models, and GCM Cloud Parameterizations to Understand Physical Processes Controlling Cirrus Properties and to Improve the Cloud Parameterizations”

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woods, Sarah

    2015-12-01

    The dual objectives of this project were improving our basic understanding of processes that control cirrus microphysical properties and improvement of the representation of these processes in the parameterizations. A major effort in the proposed research was to integrate, calibrate, and better understand the uncertainties in all of these measurements.

  9. Space Shuttle Program Primary Avionics Software System (PASS) Success Legacy -Major Accomplishments and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Orr, James K.

    2010-01-01

    This presentation has shown the accomplishments of the PASS project over three decades and highlighted the lessons learned. Over the entire time, our goal has been to continuously improve our process, implement automation for both quality and increased productivity, and identify and remove all defects due to prior execution of a flawed process in addition to improving our processes following identification of significant process escapes. Morale and workforce instability have been issues, most significantly during 1993 to 1998 (period of consolidation in aerospace industry). The PASS project has also consulted with others, including the Software Engineering Institute, so as to be an early evaluator, adopter, and adapter of state-of-the-art software engineering innovations.

  10. [QUIPS: quality improvement in postoperative pain management].

    PubMed

    Meissner, Winfried

    2011-01-01

    Despite the availability of high-quality guidelines and advanced pain management techniques acute postoperative pain management is still far from being satisfactory. The QUIPS (Quality Improvement in Postoperative Pain Management) project aims to improve treatment quality by means of standardised data acquisition, analysis of quality and process indicators, and feedback and benchmarking. During a pilot phase funded by the German Ministry of Health (BMG), a total of 12,389 data sets were collected from six participating hospitals. Outcome improved in four of the six hospitals. Process indicators, such as routine pain documentation, were only poorly correlated with outcomes. To date, more than 130 German hospitals use QUIPS as a routine quality management tool. An EC-funded parallel project disseminates the concept internationally. QUIPS demonstrates that patient-reported outcomes in postoperative pain management can be benchmarked in routine clinical practice. Quality improvement initiatives should use outcome instead of structural and process parameters. The concept is transferable to other fields of medicine. Copyright © 2011. Published by Elsevier GmbH.

  11. Does Nursing Facility Use of Habilitation Therapy Improve Performance on Quality Measures?

    PubMed

    Fitzler, Sandra; Raia, Paul; Buckley, Fredrick O; Wang, Mei

    2016-12-01

    The purpose of the project, Centers for Medicare & Medicaid Services (CMS) Innovation study, was to evaluate the impact on 12 quality measures including 10 Minimum Data Set (MDS) publicly reported measures and 2 nursing home process measures using habilitation therapy techniques and a behavior team to manage dementia-related behaviors. A prospective design was used to assess the changes in the measures. A total of 30 Massachusetts nursing homes participated in the project over a 12-month period. Project participation required the creation of an interdisciplinary behavior team, habilitation therapy training, facility visit by the program coordinator, attendance at bimonthly support and sharing calls, and monthly collection of process measure data. Participating facilities showed improvement in 9 of the 12 reported measures. Findings indicate potential quality improvement in having nursing homes learn habilitation therapy techniques and know how to use the interdisciplinary team to manage problem behaviors. © The Author(s) 2016.

  12. Project CLEAN: Safe, Sanitary School Restrooms. Fastback.

    ERIC Educational Resources Information Center

    Keating, Tom

    After introducing the problem of unsafe, dirty public school restrooms, this publication describes Project CLEAN (Citizens, Learners, and Educators Against Neglect), an effort to improve the safety, cleanliness, and hygiene of student restrooms in public schools. The Project builds a five-step, school-by-school communication process that includes:…

  13. Developing Learning Strategies Based on Research Projects

    ERIC Educational Resources Information Center

    Ampuero-Canellas, Olga; Gonzalez-Del-Rio, Jimena; Jorda-Albinana, Begona; Rojas-Sola, Jose Ignacio

    2011-01-01

    Research projects are a very important part of any professor life sheet. Through these projects, they use their knowledge to solve real problems within professional area. Besides being an advance in research area, they can essentially contribute to improving teaching process. This work originates from the idea that the experienced gotten from…

  14. Interagency Planning and Support Project. Final Report.

    ERIC Educational Resources Information Center

    Salisbury, Christine

    This final report describes the activities and outcomes of a federally funded project designed to develop, implement, and evaluate a systemically oriented process model for improving the coordination of education and human services for young children with identified disabilities and their families at the local level. The project developed and used…

  15. Collaborative Learning in Technological Project Design

    ERIC Educational Resources Information Center

    Hong, Jon-Chao; Yu, Kuang-Chao; Chen, Mei-Yung

    2011-01-01

    The POWERTECH contest in Taiwan was established in an attempt to promote inventiveness and technology to elementary school pupils. The POWERTECH contest is designed as a collaborative learning system for project design. Project design is comprised of technical processes, which include the construction of an artifact and improvement of its…

  16. Effects of organizational context on Lean implementation in five hospital systems.

    PubMed

    Harrison, Michael I; Paez, Kathryn; Carman, Kristin L; Stephens, Jennifer; Smeeding, Lauren; Devers, Kelly J; Garfinkel, Steven

    2016-01-01

    Despite broad agreement among researchers about the value of examining how context shapes implementation of improvement programs and projects, limited attention has been paid to contextual effects on implementation of Lean. To help reduce gaps in knowledge of effects of intraorganizational context, we researched Lean implementation initiatives in five organizations and examined 12 of their Lean rapid improvement projects. All projects aimed at improving clinical care delivery. On the basis of the literature on Lean, innovation, and quality improvement, we developed a framework of factors likely to affect Lean implementation and outcomes. Drawing on the framework, we conducted semistructured interviews and applied qualitative codes to the transcribed interviews. Available documents, data, and observations supplemented the interviews. We constructed case studies of Lean implementation in each organization, compared implementation across organizations, and compared the 12 projects. Intraorganizational characteristics affecting organization-wide Lean initiatives and often also shaping project outcomes included CEO commitment to Lean and active support for it, prior organizational capacity for quality improvement-based performance improvement, alignment of the Lean initiative with the organizational mission, dedication of resources and experts to Lean, staff training before and during projects, establishment of measurable and relevant project targets, planning of project sequences that enhance staff capabilities and commitment without overburdening them, and ensuring communication between project members and other affected staff. Dependence of projects on inputs of new information technology was a barrier to project success. Incremental implementation of Lean produced reported improvements in operational efficiency and occasionally in care quality. However, even under the relatively favorable circumstances prevailing in our study sites, incremental implementation did not readily change organizational culture. This study should alert researchers, managers, and teachers of management to ways that contexts shape Lean implementation and may affect other types of process redesign and quality improvement.

  17. Developing a performance data suite to facilitate lean improvement in a chemotherapy day unit.

    PubMed

    Lingaratnam, Senthil; Murray, Danielle; Carle, Amber; Kirsa, Sue W; Paterson, Rebecca; Rischin, Danny

    2013-07-01

    A multidisciplinary team from the Peter MacCallum Cancer Centre in Melbourne, Australia, developed a performance data suite to support a service improvement project based on lean manufacturing principles in its 19-chair chemotherapy day unit (CDU) and cytosuite chemotherapy production facility. The aims of the project were to reduce patient wait time and improve equity of access to the CDU. A project team consisting of a pharmacist and CDU nurse supported the management team for 10 months in engaging staff and customers to identify waste in processes, analyze root causes, eliminate non-value-adding steps, reduce variation, and level workloads to improve quality and flow. Process mapping, staff and patient tracking and opinion surveys, medical record audits, and interrogation of electronic treatment records were undertaken. This project delivered a 38% reduction in median wait time on the day (from 32 to 20 minutes; P < .01), 7-day reduction in time to commencement of treatment for patients receiving combined chemoradiotherapy regimens (from 25 to 18 days; P < .01), and 22% reduction in wastage associated with expired drug and pharmacy rework (from 29% to 7%; P < .01). Improvements in efficiency enabled the cytosuite to increase the percentage of product manufactured within 10 minutes of appointment times by 29% (from 47% to 76%; P < .01). A lean improvement methodology provided a robust framework for improved understanding and management of complex system constraints within a CDU, resulting in improved access to treatment and reduced waiting times on the day.

  18. The Daily Readiness Huddle: a process to rapidly identify issues and foster improvement through problem-solving accountability.

    PubMed

    Donnelly, Lane F; Cherian, Shirley S; Chua, Kimberly B; Thankachan, Sam; Millecker, Laura A; Koroll, Alex G; Bisset, George S

    2017-01-01

    Because of the increasing complexities of providing imaging for pediatric health care services, a more reliable process to manage the daily delivery of care is necessary. Objective We describe our Daily Readiness Huddle and the effects of the process on problem identification and improvement. Our Daily Readiness Huddle has four elements: metrics review, clinical volume review, daily readiness assessment, and problem accountability. It is attended by radiologists, directors, managers, front-line staff with concerns, representatives from support services (information technology [IT] and biomedical engineering [biomed]), and representatives who join the meeting in a virtual format from off-site locations. Data are visually displayed on erasable whiteboards. The daily readiness assessment uses queues to determine whether anyone has concerns or outlier data in regard to S-MESA (Safety, Methods, Equipment, Supplies or Associates). Through this assessment, problems are identified and categorized as quick hits (will be resolved in 24-48 h, not requiring project management) and complex issues. Complex issues are assigned an owner, quality coach and report-back date. Additionally, projects are defined as improvements that are often strategic, are anticipated to take more than 60 days, and do not necessarily arise out of identified issues during the Daily Readiness Huddle. We tracked and calculated the mean, median and range of days to resolution and completion for complex issues and for projects during the first full year of implementing this process. During the first 12 months, 91 complex issues were identified and resolved, 11 projects were in progress and 33 completed, with 23 other projects active or in planning. Time to resolution of complex issues (in days) was mean 37.5, median 34.0, and range 1-105. For projects, time to completion (in days) was mean 86.0, median 84.0, and range 5-280. The Daily Readiness Huddle process has given us a framework to rapidly identify issues, bring accountability to problem-solving, and foster improvement. It has also had a positive effect on team-building and coordination.

  19. Harnessing the power of enhanced data for healthcare quality improvement: lessons from a Minnesota Hospital Association Pilot Project.

    PubMed

    Pine, Michael; Sonneborn, Mark; Schindler, Joe; Stanek, Michael; Maeda, Jared Lane; Hanlon, Carrie

    2012-01-01

    The imperative to achieve quality improvement and cost-containment goals is driving healthcare organizations to make better use of existing health information. One strategy, the construction of hybrid data sets combining clinical and administrative data, has strong potential to improve the cost-effectiveness of hospital quality reporting processes, improve the accuracy of quality measures and rankings, and strengthen data systems. Through a two-year contract with the Agency for Healthcare Research and Quality, the Minnesota Hospital Association launched a pilot project in 2007 to link hospital clinical information to administrative data. Despite some initial challenges, this project was successful. Results showed that the use of hybrid data allowed for more accurate comparisons of risk-adjusted mortality and risk-adjusted complications across Minnesota hospitals. These increases in accuracy represent an important step toward targeting quality improvement efforts in Minnesota and provide important lessons that are being leveraged through ongoing projects to construct additional enhanced data sets. We explore the implementation challenges experienced during the Minnesota Pilot Project and their implications for hospitals pursuing similar data-enhancement projects. We also highlight the key lessons learned from the pilot project's success.

  20. Process Evaluation of a Quality Improvement Project to Decrease Hospital Readmissions From Skilled Nursing Facilities.

    PubMed

    Meehan, Thomas P; Qazi, Daniel J; Van Hoof, Thomas J; Ho, Shih-Yieh; Eckenrode, Sheila; Spenard, Ann; Pandolfi, Michelle; Johnson, Florence; Quetti, Deborah

    2015-08-01

    To describe and evaluate the impact of quality improvement (QI) support provided to skilled nursing facilities (SNFs) by a Quality Improvement Organization (QIO). Retrospective, mixed-method, process evaluation of a QI project intended to decrease preventable hospital readmissions from SNFs. Five SNFs in Connecticut. SNF Administrators, Directors of Nursing, Assistant Directors of Nursing, Admissions Coordinators, Registered Nurses, Certified Nursing Assistants, Receptionists, QIO Quality Improvement Consultant. QIO staff provided training and technical assistance to SNF administrative and clinical staff to establish or enhance QI infrastructure and implement an established set of QI tools [Interventions to Reduce Acute Care Transfers (INTERACT) tools]. Baseline SNF demographic, staffing, and hospital readmission data; baseline and follow-up SNF QI structure (QI Committee), processes (general and use of INTERACT tools), and outcome (30-day all-cause hospital readmission rates); details of QIO-provided training and technical assistance; QIO-perceived barriers to quality improvement; SNF leadership-perceived barriers, accomplishments, and suggestions for improvement of QIO support. Success occurred in establishing QI Committees and targeting preventable hospital readmissions, as well as implementing INTERACT tools in all SNFs; however, hospital readmission rates decreased in only 2 facilities. QIO staff and SNF leaders noted the ongoing challenge of engaging already busy SNF staff and leadership in QI activities. SNF leaders reported that they appreciated the training and technical assistance that their institutions received, although most noted that additional support was needed to bring about improvement in readmission rates. This process evaluation documented mixed clinical results but successfully identified opportunities to improve recruitment of and provision of technical support to participating SNFs. Recommendations are offered for others who wish to conduct similar projects. Copyright © 2015 AMDA – The Society for Post-Acute and Long-Term Care Medicine. All rights reserved.

  1. Improving image quality in laboratory x-ray phase-contrast imaging

    NASA Astrophysics Data System (ADS)

    De Marco, F.; Marschner, M.; Birnbacher, L.; Viermetz, M.; Noël, P.; Herzen, J.; Pfeiffer, F.

    2017-03-01

    Grating-based X-ray phase-contrast (gbPC) is known to provide significant benefits for biomedical imaging. To investigate these benefits, a high-sensitivity gbPC micro-CT setup for small (≍ 5 cm) biological samples has been constructed. Unfortunately, high differential-phase sensitivity leads to an increased magnitude of data processing artifacts, limiting the quality of tomographic reconstructions. Most importantly, processing of phase-stepping data with incorrect stepping positions can introduce artifacts resembling Moiré fringes to the projections. Additionally, the focal spot size of the X-ray source limits resolution of tomograms. Here we present a set of algorithms to minimize artifacts, increase resolution and improve visual impression of projections and tomograms from the examined setup. We assessed two algorithms for artifact reduction: Firstly, a correction algorithm exploiting correlations of the artifacts and differential-phase data was developed and tested. Artifacts were reliably removed without compromising image data. Secondly, we implemented a new algorithm for flatfield selection, which was shown to exclude flat-fields with strong artifacts. Both procedures successfully improved image quality of projections and tomograms. Deconvolution of all projections of a CT scan can minimize blurring introduced by the finite size of the X-ray source focal spot. Application of the Richardson-Lucy deconvolution algorithm to gbPC-CT projections resulted in an improved resolution of phase-contrast tomograms. Additionally, we found that nearest-neighbor interpolation of projections can improve the visual impression of very small features in phase-contrast tomograms. In conclusion, we achieved an increase in image resolution and quality for the investigated setup, which may lead to an improved detection of very small sample features, thereby maximizing the setup's utility.

  2. The role of water vapor in climate. A strategic research plan for the proposed GEWEX water vapor project (GVaP)

    NASA Technical Reports Server (NTRS)

    Starr, D. OC. (Editor); Melfi, S. Harvey (Editor)

    1991-01-01

    The proposed GEWEX Water Vapor Project (GVaP) addresses fundamental deficiencies in the present understanding of moist atmospheric processes and the role of water vapor in the global hydrologic cycle and climate. Inadequate knowledge of the distribution of atmospheric water vapor and its transport is a major impediment to progress in achieving a fuller understanding of various hydrologic processes and a capability for reliable assessment of potential climatic change on global and regional scales. GVap will promote significant improvements in knowledge of atmospheric water vapor and moist processes as well as in present capabilities to model these processes on global and regional scales. GVaP complements a number of ongoing and planned programs focused on various aspects of the hydrologic cycle. The goal of GVaP is to improve understanding of the role of water vapor in meteorological, hydrological, and climatological processes through improved knowledge of water vapor and its variability on all scales. A detailed description of the GVaP is presented.

  3. IMPROVING TACONITE PROCESSING PLANT EFFICIENCY BY COMPUTER SIMULATION, Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    William M. Bond; Salih Ersayin

    2007-03-30

    This project involved industrial scale testing of a mineral processing simulator to improve the efficiency of a taconite processing plant, namely the Minorca mine. The Concentrator Modeling Center at the Coleraine Minerals Research Laboratory, University of Minnesota Duluth, enhanced the capabilities of available software, Usim Pac, by developing mathematical models needed for accurate simulation of taconite plants. This project provided funding for this technology to prove itself in the industrial environment. As the first step, data representing existing plant conditions were collected by sampling and sample analysis. Data were then balanced and provided a basis for assessing the efficiency ofmore » individual devices and the plant, and also for performing simulations aimed at improving plant efficiency. Performance evaluation served as a guide in developing alternative process strategies for more efficient production. A large number of computer simulations were then performed to quantify the benefits and effects of implementing these alternative schemes. Modification of makeup ball size was selected as the most feasible option for the target performance improvement. This was combined with replacement of existing hydrocyclones with more efficient ones. After plant implementation of these modifications, plant sampling surveys were carried out to validate findings of the simulation-based study. Plant data showed very good agreement with the simulated data, confirming results of simulation. After the implementation of modifications in the plant, several upstream bottlenecks became visible. Despite these bottlenecks limiting full capacity, concentrator energy improvement of 7% was obtained. Further improvements in energy efficiency are expected in the near future. The success of this project demonstrated the feasibility of a simulation-based approach. Currently, the Center provides simulation-based service to all the iron ore mining companies operating in northern Minnesota, and future proposals are pending with non-taconite mineral processing applications.« less

  4. Electrical Storm Simulation to Improve the Learning Physics Process

    ERIC Educational Resources Information Center

    Martínez Muñoz, Miriam; Jiménez Rodríguez, María Lourdes; Gutiérrez de Mesa, José Antonio

    2013-01-01

    This work is part of a research project whose main objective is to understand the impact that the use of Information and Communication Technology (ICT) has on the teaching and learning process on the subject of Physics. We will show that, with the use of a storm simulator, physics students improve their learning process on one hand they understand…

  5. The Data-to-Action Framework: A Rapid Program Improvement Process.

    PubMed

    Zakocs, Ronda; Hill, Jessica A; Brown, Pamela; Wheaton, Jocelyn; Freire, Kimberley E

    2015-08-01

    Although health education programs may benefit from quality improvement methods, scant resources exist to help practitioners apply these methods for program improvement. The purpose of this article is to describe the Data-to-Action framework, a process that guides practitioners through rapid-feedback cycles in order to generate actionable data to improve implementation of ongoing programs. The framework was designed while implementing DELTA PREP, a 3-year project aimed at building the primary prevention capacities of statewide domestic violence coalitions. The authors describe the framework's main steps and provide a case example of a rapid-feedback cycle and several examples of rapid-feedback memos produced during the project period. The authors also discuss implications for health education evaluation and practice. © 2015 Society for Public Health Education.

  6. Management strategies to effect change in intensive care units: lessons from the world of business. Part II. Quality-improvement strategies.

    PubMed

    Gershengorn, Hayley B; Kocher, Robert; Factor, Phillip

    2014-03-01

    The success of quality-improvement projects relies heavily on both project design and the metrics chosen to assess change. In Part II of this three-part American Thoracic Society Seminars series, we begin by describing methods for determining which data to collect, tools for data presentation, and strategies for data dissemination. As Avedis Donabedian detailed a half century ago, defining metrics in healthcare can be challenging; algorithmic determination of the best type of metric (outcome, process, or structure) can help intensive care unit (ICU) managers begin this process. Choosing appropriate graphical data displays (e.g., run charts) can prompt discussions about and promote quality improvement. Similarly, dashboards/scorecards are useful in presenting performance improvement data either publicly or privately in a visually appealing manner. To have compelling data to show, ICU managers must plan quality-improvement projects well. The second portion of this review details four quality-improvement tools-checklists, Six Sigma methodology, lean thinking, and Kaizen. Checklists have become commonplace in many ICUs to improve care quality; thinking about how to maximize their effectiveness is now of prime importance. Six Sigma methodology, lean thinking, and Kaizen are techniques that use multidisciplinary teams to organize thinking about process improvement, formalize change strategies, actualize initiatives, and measure progress. None originated within healthcare, but each has been used in the hospital environment with success. To conclude this part of the series, we demonstrate how to use these tools through an example of improving the timely administration of antibiotics to patients with sepsis.

  7. IPAD project overview

    NASA Technical Reports Server (NTRS)

    Fulton, R. E.

    1980-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace-Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of technology and associated software for integrated company-wide management of engineering information. The project has been underway since 1976 under the guidance of an Industry Technical Advisory Board (ITAB) composed of representatives of major engineering and computer companies and in close collaboration with the Air Force Integrated Computer-Aided Manufacturing (ICAM) program. Results to date on the IPAD project include an in-depth documentation of a representative design process for a large engineering project, the definition and design of computer-aided design software needed to support that process, and the release of prototype software to integrate selected design functions. Ongoing work concentrates on development of prototype software to manage engineering information, and initial software is nearing release.

  8. The Use of Radar to Improve Rainfall Estimation over the Tennessee and San Joaquin River Valleys

    NASA Technical Reports Server (NTRS)

    Petersen, Walter A.; Gatlin, Patrick N.; Felix, Mariana; Carey, Lawrence D.

    2010-01-01

    This slide presentation provides an overview of the collaborative radar rainfall project between the Tennessee Valley Authority (TVA), the Von Braun Center for Science & Innovation (VCSI), NASA MSFC and UAHuntsville. Two systems were used in this project, Advanced Radar for Meteorological & Operational Research (ARMOR) Rainfall Estimation Processing System (AREPS), a demonstration project of real-time radar rainfall using a research radar and NEXRAD Rainfall Estimation Processing System (NREPS). The objectives, methodology, some results and validation, operational experience and lessons learned are reviewed. The presentation. Another project that is using radar to improve rainfall estimations is in California, specifically the San Joaquin River Valley. This is part of a overall project to develop a integrated tool to assist water management within the San Joaquin River Valley. This involves integrating several components: (1) Radar precipitation estimates, (2) Distributed hydro model, (3) Snowfall measurements and Surface temperature / moisture measurements. NREPS was selected to provide precipitation component.

  9. Maintenance of Certification: How Performance in Practice Changes Improve Tobacco Cessation in Addiction Psychiatrists’ Practice

    PubMed Central

    Ford, James H.; Oliver, Karen A.; Giles, Miriam; Cates-Wessel, Kathryn; Krahn, Dean; Levin, Frances R.

    2017-01-01

    Background and Objectives In 2000, the American Board of Medical Specialties implemented the Maintenance of Certification (MOC), a structured process to help physicians identify and implement a quality improvement project to improve patient care. This study reports on findings from an MOC Performance in Practice (PIP) module designed and evaluated by addiction psychiatrists who are members of the American Academy of Addiction Psychiatry (AAAP). Method A 3-phase process was utilized to recruit AAAP members to participate in the study. The current study utilized data from 154 self-selected AAAP members who evaluated the effectiveness of the MOC Tobacco Cessation PIP. Results Of the physicians participating, 76% (n 120) completed the Tobacco PIP. A paired t-test analysis revealed that reported changes in clinical measure documentation were significant across all six measures. Targeted improvement efforts focused on a single clinical measure. Results found that simple change projects designed to improve clinical practice led to substantial changes in self-reported chart documentation for the selected measure. Conclusions The current findings suggest that addiction psychiatrists can leverage the MOC process to improve clinical care. PMID:27973746

  10. Building capacity for evidence generation, synthesis and implementation to improve the care of mothers and babies in South East Asia: methods and design of the SEA-ORCHID Project using a logical framework approach.

    PubMed

    McDonald, Steve; Turner, Tari; Chamberlain, Catherine; Lumbiganon, Pisake; Thinkhamrop, Jadsada; Festin, Mario R; Ho, Jacqueline J; Mohammad, Hakimi; Henderson-Smart, David J; Short, Jacki; Crowther, Caroline A; Martis, Ruth; Green, Sally

    2010-07-01

    Rates of maternal and perinatal mortality remain high in developing countries despite the existence of effective interventions. Efforts to strengthen evidence-based approaches to improve health in these settings are partly hindered by restricted access to the best available evidence, limited training in evidence-based practice and concerns about the relevance of existing evidence. South East Asia--Optimising Reproductive and Child Health in Developing Countries (SEA-ORCHID) was a five-year project that aimed to determine whether a multifaceted intervention designed to strengthen the capacity for research synthesis, evidence-based care and knowledge implementation improved clinical practice and led to better health outcomes for mothers and babies. This paper describes the development and design of the SEA-ORCHID intervention plan using a logical framework approach. SEA-ORCHID used a before-and-after design to evaluate the impact of a multifaceted tailored intervention at nine sites across Thailand, Malaysia, Philippines and Indonesia, supported by three centres in Australia. We used a logical framework approach to systematically prepare and summarise the project plan in a clear and logical way. The development and design of the SEA-ORCHID project was based around the three components of a logical framework (problem analysis, project plan and evaluation strategy). The SEA-ORCHID logical framework defined the project's goal and purpose (To improve the health of mothers and babies in South East Asia and To improve clinical practice in reproductive health in South East Asia), and outlined a series of project objectives and activities designed to achieve these. The logical framework also established outcome and process measures appropriate to each level of the project plan, and guided project work in each of the participating countries and hospitals. Development of a logical framework in the SEA-ORCHID project enabled a reasoned, logical approach to the project design that ensured the project activities would achieve the desired outcomes and that the evaluation plan would assess both the process and outcome of the project. The logical framework was also valuable over the course of the project to facilitate communication, assess progress and build a shared understanding of the project activities, purpose and goal.

  11. Building capacity for evidence generation, synthesis and implementation to improve the care of mothers and babies in South East Asia: methods and design of the SEA-ORCHID Project using a logical framework approach

    PubMed Central

    2010-01-01

    Background Rates of maternal and perinatal mortality remain high in developing countries despite the existence of effective interventions. Efforts to strengthen evidence-based approaches to improve health in these settings are partly hindered by restricted access to the best available evidence, limited training in evidence-based practice and concerns about the relevance of existing evidence. South East Asia - Optimising Reproductive and Child Health in Developing Countries (SEA-ORCHID) was a five-year project that aimed to determine whether a multifaceted intervention designed to strengthen the capacity for research synthesis, evidence-based care and knowledge implementation improved clinical practice and led to better health outcomes for mothers and babies. This paper describes the development and design of the SEA-ORCHID intervention plan using a logical framework approach. Methods SEA-ORCHID used a before-and-after design to evaluate the impact of a multifaceted tailored intervention at nine sites across Thailand, Malaysia, Philippines and Indonesia, supported by three centres in Australia. We used a logical framework approach to systematically prepare and summarise the project plan in a clear and logical way. The development and design of the SEA-ORCHID project was based around the three components of a logical framework (problem analysis, project plan and evaluation strategy). Results The SEA-ORCHID logical framework defined the project's goal and purpose (To improve the health of mothers and babies in South East Asia and To improve clinical practice in reproductive health in South East Asia), and outlined a series of project objectives and activities designed to achieve these. The logical framework also established outcome and process measures appropriate to each level of the project plan, and guided project work in each of the participating countries and hospitals. Conclusions Development of a logical framework in the SEA-ORCHID project enabled a reasoned, logical approach to the project design that ensured the project activities would achieve the desired outcomes and that the evaluation plan would assess both the process and outcome of the project. The logical framework was also valuable over the course of the project to facilitate communication, assess progress and build a shared understanding of the project activities, purpose and goal. PMID:20594325

  12. A Study of Technical Engineering Peer Reviews at NASA

    NASA Technical Reports Server (NTRS)

    Chao, Lawrence P.; Tumer, Irem Y.; Bell, David G.

    2003-01-01

    This report describes the state of practices of design reviews at NASA and research into what can be done to improve peer review practices. There are many types of reviews at NASA: required and not, formalized and informal, programmatic and technical. Standing project formal reviews such as the Preliminary Design Review and Critical Design Review are a required part of every project and mission development. However, the technical, engineering peer reviews that support teams' work on such projects are informal, some times ad hoc, and inconsistent across the organization. The goal of this work is to identify best practices and lessons learned from NASA's experience, supported by academic research and methodologies to ultimately improve the process. This research has determined that the organization, composition, scope, and approach of the reviews impact their success. Failure Modes and Effects Analysis (FMEA) can identify key areas of concern before or in the reviews. Product definition tools like the Project Priority Matrix, engineering-focused Customer Value Chain Analysis (CVCA), and project or system-based Quality Function Deployment (QFD) help prioritize resources in reviews. The use of information technology and structured design methodologies can strengthen the engineering peer review process to help NASA work towards error-proofing the design process.

  13. The Impact of Project Work and the Writing Process Method on Writing Production

    ERIC Educational Resources Information Center

    Díaz Ramírez, Marcela

    2014-01-01

    This article presents the outcomes of an investigation whose main goal was to implement the methodology of project work and a process approach in order to improve writing production in an English class of Colombian university students since their diagnostic tests showed that their written production had the lowest score. Based on data collected,…

  14. Introducing practice-based learning and improvement ACGME core competencies into a family medicine residency curriculum.

    PubMed

    Coleman, Mary Thoesen; Nasraty, Soraya; Ostapchuk, Michael; Wheeler, Stephen; Looney, Stephen; Rhodes, Sandra

    2003-05-01

    The Accreditation Council for Graduate Medical Education (ACGME) recommends integrating improvement activities into residency training. A curricular change was designed at the Department of Family and Community Medicine, University of Louisville, to address selected ACGME competencies by incorporating practice-based improvement activities into the routine clinical work of family medicine residents. Teams of residents, faculty, and office staff completed clinical improvement projects at three ambulatory care training sites. Residents were given academic credit for participation in team meetings. After 6 months, residents presented results to faculty, medical students, other residents, and staff from all three training sites. Residents, staff, and faculty were recognized for their participation. Resident teams demonstrated ACGME competencies in practice-based improvement: Chart audits indicated improvement in clinical projects; quality improvement tools demonstrated analysis of root causes and understanding of the process; plan-do-study-act cycle worksheets demonstrated the change process. Improvement activities that affect patient care and demonstrate selected ACGME competencies can be successfully incorporated into the daily work of family medicine residents.

  15. Visualizing the Complex Process for Deep Learning with an Authentic Programming Project

    ERIC Educational Resources Information Center

    Peng, Jun; Wang, Minhong; Sampson, Demetrios

    2017-01-01

    Project-based learning (PjBL) has been increasingly used to connect abstract knowledge and authentic tasks in educational practice, including computer programming education. Despite its promising effects on improving learning in multiple aspects, PjBL remains a struggle due to its complexity. Completing an authentic programming project involves a…

  16. Photovoltaic Manufacturing R&D Project | Photovoltaic Research | NREL

    Science.gov Websites

    Photovoltaic (PV) Manufacturing Research and Development (R&D) Project was a cost-shared partnership between NREL and a number of private-sector solar companies. The primary project goals were to reduce costs for consumers and solar companies by improving products and manufacturing processes and ensure the

  17. Learning from Experience: A Collection of Service-Learning Projects Linking Academic Standards to Curriculum.

    ERIC Educational Resources Information Center

    Babcock, Barbara, Ed.

    Service-learning projects combine community service with student learning in a practical way that enhances academic knowledge and improves community environments and fellowship. This compilation is designed to show the service-learning process in action. The collection presents outstanding examples of successful service-learning projects as…

  18. Therapeutic Use of Space: One Agency's Transformation Project

    ERIC Educational Resources Information Center

    Goelitz, Ann; Stewart-Kahn, Abigail

    2007-01-01

    The project described in this article addresses the therapeutic use of physical space in an outpatient counseling facility. It was theorized that an improved facility environment could be used as a practice tool when working with a vulnerable population. The authors undertook the project with limited time and finances. The process of the change…

  19. Critical Literacy for School Improvement: An Action Research Project

    ERIC Educational Resources Information Center

    Cooper, Karyn; White, Robert E.

    2008-01-01

    This article provides an overview of the integrative process of initiating an action research project on literacy for students "at risk" in a Canadian urban elementary school. As the article demonstrates, this requires development of a school-wide framework, which informs the action research project and desired outcomes, and a shared…

  20. Use of a structured template to facilitate practice-based learning and improvement projects.

    PubMed

    McClain, Elizabeth K; Babbott, Stewart F; Tsue, Terance T; Girod, Douglas A; Clements, Debora; Gilmer, Lisa; Persons, Diane; Unruh, Greg

    2012-06-01

    The Accreditation Council for Graduate Medical Education (ACGME) requires residency programs to meet and demonstrate outcomes across 6 competencies. Measuring residents' competency in practice-based learning and improvement (PBLI) is particularly challenging. We developed an educational tool to meet ACGME requirements for PBLI. The PBLI template helped programs document quality improvement (QI) projects and supported increased scholarly activity surrounding PBLI learning. We reviewed program requirements for 43 residency and fellowship programs and identified specific PBLI requirements for QI activities. We also examined ACGME Program Information Form responses on PBLI core competency questions surrounding QI projects for program sites visited in 2008-2009. Data were integrated by a multidisciplinary committee to develop a peer-protected PBLI template guiding programs through process, documentation, and evaluation of QI projects. All steps were reviewed and approved through our GME Committee structure. An electronic template, companion checklist, and evaluation form were developed using identified project characteristics to guide programs through the PBLI process and facilitate documentation and evaluation of the process. During a 24 month period, 27 programs have completed PBLI projects, and 15 have reviewed the template with their education committees, but have not initiated projects using the template. The development of the tool generated program leaders' support because the tool enhanced the ability to meet program-specific objectives. The peer-protected status of this document for confidentiality and from discovery has been beneficial for program usage. The document aggregates data on PBLI and QI initiatives, offers opportunities to increase scholarship in QI, and meets the ACGME goal of linking measures to outcomes important to meeting accreditation requirements at the program and institutional level.

  1. Use of a Structured Template to Facilitate Practice-Based Learning and Improvement Projects

    PubMed Central

    McClain, Elizabeth K.; Babbott, Stewart F.; Tsue, Terance T.; Girod, Douglas A.; Clements, Debora; Gilmer, Lisa; Persons, Diane; Unruh, Greg

    2012-01-01

    Background The Accreditation Council for Graduate Medical Education (ACGME) requires residency programs to meet and demonstrate outcomes across 6 competencies. Measuring residents' competency in practice-based learning and improvement (PBLI) is particularly challenging. Purpose We developed an educational tool to meet ACGME requirements for PBLI. The PBLI template helped programs document quality improvement (QI) projects and supported increased scholarly activity surrounding PBLI learning. Methods We reviewed program requirements for 43 residency and fellowship programs and identified specific PBLI requirements for QI activities. We also examined ACGME Program Information Form responses on PBLI core competency questions surrounding QI projects for program sites visited in 2008–2009. Data were integrated by a multidisciplinary committee to develop a peer-protected PBLI template guiding programs through process, documentation, and evaluation of QI projects. All steps were reviewed and approved through our GME Committee structure. Results An electronic template, companion checklist, and evaluation form were developed using identified project characteristics to guide programs through the PBLI process and facilitate documentation and evaluation of the process. During a 24 month period, 27 programs have completed PBLI projects, and 15 have reviewed the template with their education committees, but have not initiated projects using the template. Discussion The development of the tool generated program leaders' support because the tool enhanced the ability to meet program-specific objectives. The peer-protected status of this document for confidentiality and from discovery has been beneficial for program usage. The document aggregates data on PBLI and QI initiatives, offers opportunities to increase scholarship in QI, and meets the ACGME goal of linking measures to outcomes important to meeting accreditation requirements at the program and institutional level. PMID:23730444

  2. Software for improving the quality of project management, a case study: international manufacture of electrical equipment

    NASA Astrophysics Data System (ADS)

    Preradović, D. M.; Mićić, Lj S.; Barz, C.

    2017-05-01

    Production conditions in today’s world require software support at every stage of production and development of new products, for quality assurance and compliance with ISO standards. In addition to ISO standards such as usual metrics of quality, companies today are focused on other optional standards, such as CMMI (Capability Maturity Model Integrated) or prescribing they own standards. However, while there is intensive progress being made in the PM (project management), there is still a significant number of projects, at the global level, that are failures. These have failed to achieve their goals, within budget or timeframe. This paper focuses on checking the role of software tools through the rate of success in projects implemented in the case of internationally manufactured electrical equipment. The results of this research show the level of contribution of the project management software used to manage and develop new products to improve PM processes and PM functions, and how selection of the software tools affects the quality of PM processes and successfully completed projects.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lower, Mark D; Christopher, Timothy W; Oland, C Barry

    The Facilities and Operations (F&O) Directorate is sponsoring a continuous process improvement (CPI) program. Its purpose is to stimulate, promote, and sustain a culture of improvement throughout all levels of the organization. The CPI program ensures that a scientific and repeatable process exists for improving the delivery of F&O products and services in support of Oak Ridge National Laboratory (ORNL) Management Systems. Strategic objectives of the CPI program include achieving excellence in laboratory operations in the areas of safety, health, and the environment. Identifying and promoting opportunities for achieving the following critical outcomes are important business goals of the CPImore » program: improved safety performance; process focused on consumer needs; modern and secure campus; flexibility to respond to changing laboratory needs; bench strength for the future; and elimination of legacy issues. The Steam Pressure-Reducing Station (SPRS) Safety and Energy Efficiency Improvement Project, which is under the CPI program, focuses on maintaining and upgrading SPRSs that are part of the ORNL steam distribution network. This steam pipe network transports steam produced at the ORNL steam plant to many buildings in the main campus site. The SPRS Safety and Energy Efficiency Improvement Project promotes excellence in laboratory operations by (1) improving personnel safety, (2) decreasing fuel consumption through improved steam system energy efficiency, and (3) achieving compliance with applicable worker health and safety requirements. The SPRS Safety and Energy Efficiency Improvement Project being performed by F&O is helping ORNL improve both energy efficiency and worker safety by modifying, maintaining, and repairing SPRSs. Since work began in 2006, numerous energy-wasting steam leaks have been eliminated, heat losses from uninsulated steam pipe surfaces have been reduced, and deficient pressure retaining components have been replaced. These improvements helped ORNL reduce its overall utility costs by decreasing the amount of fuel used to generate steam. Reduced fuel consumption also decreased air emissions. These improvements also helped lower the risk of burn injuries to workers and helped prevent shrapnel injuries resulting from missiles produced by pressurized component failures. In most cases, the economic benefit and cost effectiveness of the SPRS Safety and Energy Efficiency Improvement Project is reflected in payback periods of 1 year or less.« less

  4. Research Progress of Building Materials Used in Construction Land

    NASA Astrophysics Data System (ADS)

    Niu, Yan

    2018-01-01

    Construction land preparation is an important aspect of land remediation project. The research of materials in the process of land improvement is the foundation and the core. Therefore, it is necessary to study the materials that may be involved in the process of building land preparation. In this paper, the research on the construction materials such as recycled concrete, geosynthetics, soil stabilizers, soil improvers, building insulation materials and inorganic fibrous insulation materials, which are commonly used in construction sites, is reviewed and discussed in this paper. Land remediation project involved in the construction of land materials to provide reference.

  5. Knowledge representation into Ada parallel processing

    NASA Technical Reports Server (NTRS)

    Masotto, Tom; Babikyan, Carol; Harper, Richard

    1990-01-01

    The Knowledge Representation into Ada Parallel Processing project is a joint NASA and Air Force funded project to demonstrate the execution of intelligent systems in Ada on the Charles Stark Draper Laboratory fault-tolerant parallel processor (FTPP). Two applications were demonstrated - a portion of the adaptive tactical navigator and a real time controller. Both systems are implemented as Activation Framework Objects on the Activation Framework intelligent scheduling mechanism developed by Worcester Polytechnic Institute. The implementations, results of performance analyses showing speedup due to parallelism and initial efficiency improvements are detailed and further areas for performance improvements are suggested.

  6. Low-gravity homogenization and solidification of aluminum antimonide. [Apollo-Soyuz test project

    NASA Technical Reports Server (NTRS)

    Ang, C.-Y.; Lacy, L. L.

    1976-01-01

    The III-V semiconducting compound AlSb shows promise as a highly efficient solar cell material, but it has not been commercially exploited because of difficulties in compound synthesis. Liquid state homogenization and solidification of AlSb were carried out in the Apollo-Soyuz Test Project Experiment MA-044 in the hope that compositional homogeneity would be improved by negating the large density difference between the two constituents. Post-flight analysis and comparative characterization of the space-processed and ground-processed samples indicate that there are major homogeneity improvements in the low-gravity solidified material.

  7. Biomass pre-extraction, hydrolysis and conversion process improvements fro an integrated biorefinery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jansen, Robert

    In this project, Virdia will show that it can improve the production of sugars suitable for the conversion into advanced biofuels from a range of woods. Several biomass feedstocks (Pine wood chips & Eucalyptus wood chips) will be tested on this new integrated biorefinery platform. The resultant drop-in biodiesel can be a cost-effective petroleum-replacement that can compete with projected market prices

  8. Implementing a Systematic Process for Consistent Nursing Care in a NICU: A Quality Improvement Project.

    PubMed

    McCarley, Renay Marie; Dowling, Donna A; Dolansky, Mary A; Bieda, Amy

    2018-03-01

    The global aim of this quality improvement project was to develop and implement a systematic process to assign and maintain consistent bedside nurses for infants and families. A systematic process based on a primary care nursing model was implemented to assign consistent care for a 48-bed, single-family room NICU. Four PDSA cycles were necessary to obtain agreement from the nursing staff as to the best process for assigning primary nurses. Post-intervention data revealed a 9.5 percent decrease of consistent caregivers for infants in the NICU ≤ 28 days and a 2.3 percent increase of consistent caregivers for infants in the NICU ≥ 29 days. Although these findings did not meet the goal of the specific aim, a systematic process was created to assign bedside nurses to infants. Further PDSAs will be needed to refine the process to reach the aim.

  9. Project prioritization and selection process : economic vitality.

    DOT National Transportation Integrated Search

    2010-05-19

    This measure will attempt to gauge how improvements in the regions transportation network reduce constraints on commerce and industry, improve productivity and labor market access, and expand opportunity for new business.

  10. Development of rational pay factors based on concrete compressive strength data

    DOT National Transportation Integrated Search

    2008-06-01

    This research project addresses the opportunity to contain the escalating costs of concrete materials in construction projects. Both statistical process control and rational acceptance criteria show that quality improvement and cost savings can be ac...

  11. Identify involved agencies addressing safety when freight centers are planned and developed : project summary.

    DOT National Transportation Integrated Search

    2017-01-01

    This project aimed to improve coordination and : cooperation among various entities in the : planning process for developing safer and more : efficient connections between intermodal : facilities and the highway network. Coordination : and cooperatio...

  12. Innovative tools and techniques in identifying highway safety improvement projects : project summary.

    DOT National Transportation Integrated Search

    2017-01-01

    Researchers completed the following activities: - Reviewed the literature, state HSIP processes and practices, and HSIP tools used by various agencies. - Evaluated the applicability of safety assessment methods and tools used by other states and loca...

  13. Digital Light Processing update: status and future applications

    NASA Astrophysics Data System (ADS)

    Hornbeck, Larry J.

    1999-05-01

    Digital Light Processing (DLP) projection displays based on the Digital Micromirror Device (DMD) were introduced to the market in 1996. Less than 3 years later, DLP-based projectors are found in such diverse applications as mobile, conference room, video wall, home theater, and large-venue. They provide high-quality, seamless, all-digital images that have exceptional stability as well as freedom from both flicker and image lag. Marked improvements have been made in the image quality of DLP-based projection display, including brightness, resolution, contrast ratio, and border image. DLP-based mobile projectors that weighted about 27 pounds in 1996 now weight only about 7 pounds. This weight reduction has been responsible for the definition of an entirely new projector class, the ultraportable. New applications are being developed for this important new projection display technology; these include digital photofinishing for high process speed minilab and maxilab applications and DLP Cinema for the digital delivery of films to audiences around the world. This paper describes the status of DLP-based projection display technology, including its manufacturing, performance improvements, and new applications, with emphasis on DLP Cinema.

  14. Improving Service Delivery in a County Health Department WIC Clinic: An Application of Statistical Process Control Techniques

    PubMed Central

    Boe, Debra Thingstad; Parsons, Helen

    2009-01-01

    Local public health agencies are challenged to continually improve service delivery, yet they frequently operate with constrained resources. Quality improvement methods and techniques such as statistical process control are commonly used in other industries, and they have recently been proposed as a means of improving service delivery and performance in public health settings. We analyzed a quality improvement project undertaken at a local Special Supplemental Nutrition Program for Women, Infants, and Children (WIC) clinic to reduce waiting times and improve client satisfaction with a walk-in nutrition education service. We used statistical process control techniques to evaluate initial process performance, implement an intervention, and assess process improvements. We found that implementation of these techniques significantly reduced waiting time and improved clients' satisfaction with the WIC service. PMID:19608964

  15. Potential Natural Vegetation of the Mississippi Alluvial Valley: Boeuf-Tensas Basin, Arkansas, Field Atlas

    DTIC Science & Technology

    2012-09-01

    under the auspices of federal and state research programs or in conjunction with Corps of Engineers project planning efforts. In the process , a...in the field effort and assembled and processed the original project GIS data. Malcolm Williamson (Center for Advanced Spatial Technologies...further improve drainage. ERDC/EL TR-12-28 5 3 Using the PNV map as a model for restoration The PNV mapping process was conceived as a way to

  16. Lightning Arrestor Connectors Production Readiness

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marten, Steve; Linder, Kim; Emmons, Jim

    2008-10-20

    The Lightning Arrestor Connector (LAC), part “M”, presented opportunities to improve the processes used to fabricate LACs. The A## LACs were the first production LACs produced at the KCP, after the product was transferred from Pinnellas. The new LAC relied on the lessons learned from the A## LACs; however, additional improvements were needed to meet the required budget, yield, and schedule requirements. Improvement projects completed since 2001 include Hermetic Connector Sealing Improvement, Contact Assembly molding Improvement, development of a second vendor for LAC shells, general process improvement, tooling improvement, reduction of the LAC production cycle time, and documention of themore » LAC granule fabrication process. This report summarizes the accomplishments achieved in improving the LAC Production Readiness.« less

  17. How to achieve and prove performance improvement - 15 years of experience in German wastewater benchmarking.

    PubMed

    Bertzbach, F; Franz, T; Möller, K

    2012-01-01

    This paper shows the results of performance improvement, which have been achieved in benchmarking projects in the wastewater industry in Germany over the last 15 years. A huge number of changes in operational practice and also in achieved annual savings can be shown, induced in particular by benchmarking at process level. Investigation of this question produces some general findings for the inclusion of performance improvement in a benchmarking project and for the communication of its results. Thus, we elaborate on the concept of benchmarking at both utility and process level, which is still a necessary distinction for the integration of performance improvement into our benchmarking approach. To achieve performance improvement via benchmarking it should be made quite clear that this outcome depends, on one hand, on a well conducted benchmarking programme and, on the other, on the individual situation within each participating utility.

  18. Cellulosic Biomass Sugars to Advantaged Jet Fuel – Catalytic Conversion of Corn Stover to Energy Dense, Low Freeze Point Paraffins and Naphthenes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cortright, Randy

    The purpose of this project was to demonstrate the technical and commercial feasibility of producing liquid fuels, particularly jet fuel, from lignocellulosic materials, such as corn stover. This project was led by Virent, Inc. (Virent) which has developed a novel chemical catalytic process (the BioForming ® platform) capable of producing “direct replacement” liquid fuels from biomass-derived feedstocks. Virent has shown it is possible to produce an advantaged jet fuel from biomass that meets or exceeds specifications for commercial and military jet fuel through Fuel Readiness Level (FRL) 5, Process Validation. This project leveraged The National Renewable Energy Lab’s (NREL) expertisemore » in converting corn stover to sugars via dilute acid pretreatment and enzymatic hydrolysis. NREL had previously developed this deconstruction technology for the conversion of corn stover to ethanol. In this project, Virent and NREL worked together to condition the NREL generated hydrolysate for use in Virent’s catalytic process through solids removal, contaminant reduction, and concentration steps. The Idaho National Laboratory (INL) was contracted in this project for the procurement, formatting, storage and analysis of corn stover and Northwestern University developed fundamental knowledge of lignin deconstruction that can help improve overall carbon recovery of the combined technologies. Virent conducted fundamental catalytic studies to improve the performance of the catalytic process and NREL provided catalyst characterization support. A technoeconomic analysis (TEA) was conducted at each stage of the project, with results from these analyses used to inform the direction of the project.« less

  19. Interrupted Time Series Versus Statistical Process Control in Quality Improvement Projects.

    PubMed

    Andersson Hagiwara, Magnus; Andersson Gäre, Boel; Elg, Mattias

    2016-01-01

    To measure the effect of quality improvement interventions, it is appropriate to use analysis methods that measure data over time. Examples of such methods include statistical process control analysis and interrupted time series with segmented regression analysis. This article compares the use of statistical process control analysis and interrupted time series with segmented regression analysis for evaluating the longitudinal effects of quality improvement interventions, using an example study on an evaluation of a computerized decision support system.

  20. INDOT-JTRP LPA process improvement.

    DOT National Transportation Integrated Search

    2016-03-01

    The Indiana Department of Transportation (INDOT) administers the INDOT Local Public Agency Program (LPA Program) to provide funds : to local public agencies for transportation related improvement projects. The funds distributed through this program a...

  1. Productivity improvement in engineering at Rocketdyne

    NASA Technical Reports Server (NTRS)

    Nordlund, R. M.; Vogt, S. T.; Woo, A. K.

    1985-01-01

    The Rocketdyne Division of Rockwell International has embarked on a productivity improvement program in engineering. This effort included participation in the White Collar Productivity Improvement (WCPI) project sponsored by the American Productivity Center. A number of things have been learned through this project. It seems that any productivity improvement project should be employee driven. The Rocketdyne project was essentially started as a result of a grassroots effort to remove some particular hindrances, and employee enthusiasm was a prime factor in the continuing progress of the effort. A significant result was that awareness of problems at all levels increased. Many issues surfaced in the diagnostic phase, and were then noted and discussed. This process added legitimacy to issues that had previously been merely unspoken concerns. The initial feelings of many members of the pilot group was that significant changes would occur relatively quickly. It is now recognized that this will have to be an ongoing, long-term effort.

  2. Total quality management: It works for aerospace information services

    NASA Technical Reports Server (NTRS)

    Erwin, James; Eberline, Carl; Colquitt, Wanda

    1993-01-01

    Today we are in the midst of information and 'total quality' revolutions. At the NASA STI Program's Center for AeroSpace Information (CASI), we are focused on using continuous improvements techniques to enrich today's services and products and to ensure that tomorrow's technology supports the TQM-based improvement of future STI program products and services. The Continuous Improvements Program at CASI is the foundation for Total Quality Management in products and services. The focus is customer-driven; its goal, to identify processes and procedures that can be improved and new technologies that can be integrated with the processes to gain efficiencies, provide effectiveness, and promote customer satisfaction. This Program seeks to establish quality through an iterative defect prevention approach that is based on the incorporation of standards and measurements into the processing cycle. Four projects are described that utilize cross-functional, problem-solving teams for identifying requirements and defining tasks and task standards, management participation, attention to critical processes, and measurable long-term goals. The implementation of these projects provides the customer with measurably improved access to information that is provided through several channels: the NASA STI Database, document requests for microfiche and hardcopy, and the Centralized Help Desk.

  3. Developing a Performance Data Suite to Facilitate Lean Improvement in a Chemotherapy Day Unit

    PubMed Central

    Lingaratnam, Senthil; Murray, Danielle; Carle, Amber; Kirsa, Sue W.; Paterson, Rebecca; Rischin, Danny

    2013-01-01

    Purpose: A multidisciplinary team from the Peter MacCallum Cancer Centre in Melbourne, Australia, developed a performance data suite to support a service improvement project based on lean manufacturing principles in its 19-chair chemotherapy day unit (CDU) and cytosuite chemotherapy production facility. The aims of the project were to reduce patient wait time and improve equity of access to the CDU. Methods: A project team consisting of a pharmacist and CDU nurse supported the management team for 10 months in engaging staff and customers to identify waste in processes, analyze root causes, eliminate non–value-adding steps, reduce variation, and level workloads to improve quality and flow. Process mapping, staff and patient tracking and opinion surveys, medical record audits, and interrogation of electronic treatment records were undertaken. Results: This project delivered a 38% reduction in median wait time on the day (from 32 to 20 minutes; P < .01), 7-day reduction in time to commencement of treatment for patients receiving combined chemoradiotherapy regimens (from 25 to 18 days; P < .01), and 22% reduction in wastage associated with expired drug and pharmacy rework (from 29% to 7%; P < .01). Improvements in efficiency enabled the cytosuite to increase the percentage of product manufactured within 10 minutes of appointment times by 29% (from 47% to 76%; P < .01). Conclusion: A lean improvement methodology provided a robust framework for improved understanding and management of complex system constraints within a CDU, resulting in improved access to treatment and reduced waiting times on the day. PMID:23942927

  4. RTEMS CENTRE- RTEMS Improvement

    NASA Astrophysics Data System (ADS)

    Silva, Helder; Constantino, Alexandre; Freitas, Daniel; Coutinho, Manuel; Faustino, Sergio; Sousa, Jose; Dias, Luis; Zulianello, Marco

    2010-08-01

    During the last two years, EDISOFT's RTEMS CENTRE team [1], jointly with the European Space Agency and with the support of the worldwide RTEMS community [2], have been developing an activity to facilitate the qualification of the real-time operating system RTEMS (Real-Time Operating System for Multiprocessor Systems). This paper intends to give a high level visibility of the progress and the results obtained in the RTEMS Improvement [3] activity. The primary objective [4] of the project is to improve the RTEMS product, its documentation and to facilitate the qualification of RTEMS for future space missions, taking into consideration the specific operational requirements. The sections below provide a brief overview of the RTEMS operating system and the activities performed in the RTEMS Improvement project, which includes the selection of API managers to be qualified, the tailoring process, the requirements analysis, the reverse engineering and design of the RTEMS, the quality assurance process, the ISVV activities, the test campaign, the results obtained, the criticality analysis and the facilitation of qualification process.

  5. Facilitating comparative effectiveness research in cancer genomics: evaluating stakeholder perceptions of the engagement process.

    PubMed

    Deverka, Patricia A; Lavallee, Danielle C; Desai, Priyanka J; Armstrong, Joanne; Gorman, Mark; Hole-Curry, Leah; O'Leary, James; Ruffner, B W; Watkins, John; Veenstra, David L; Baker, Laurence H; Unger, Joseph M; Ramsey, Scott D

    2012-07-01

    The Center for Comparative Effectiveness Research in Cancer Genomics completed a 2-year stakeholder-guided process for the prioritization of genomic tests for comparative effectiveness research studies. We sought to evaluate the effectiveness of engagement procedures in achieving project goals and to identify opportunities for future improvements. The evaluation included an online questionnaire, one-on-one telephone interviews and facilitated discussion. Responses to the online questionnaire were tabulated for descriptive purposes, while transcripts from key informant interviews were analyzed using a directed content analysis approach. A total of 11 out of 13 stakeholders completed both the online questionnaire and interview process, while nine participated in the facilitated discussion. Eighty-nine percent of questionnaire items received overall ratings of agree or strongly agree; 11% of responses were rated as neutral with the exception of a single rating of disagreement with an item regarding the clarity of how stakeholder input was incorporated into project decisions. Recommendations for future improvement included developing standard recruitment practices, role descriptions and processes for improved communication with clinical and comparative effectiveness research investigators. Evaluation of the stakeholder engagement process provided constructive feedback for future improvements and should be routinely conducted to ensure maximal effectiveness of stakeholder involvement.

  6. Advanced Metalworking Solutions for Naval Systems That Go In Harm’s Way

    DTIC Science & Technology

    2013-01-01

    quarter century of projects, including early research and development of technologies such as semi-solid metalworking; powder metallurgy; and process...modeling and simulation. More recent projects have focused on friction stir welding, hybrid laser -arc welded metallic sandwich panels, and improved...Metalworking Center has optimized a wide variety of manufacturing technologies throughout its 25-year history, including powder metallurgy processing, semi

  7. Network model of project "Lean Production"

    NASA Astrophysics Data System (ADS)

    Khisamova, E. D.

    2018-05-01

    Economical production implies primarily new approaches to culture of management and organization of production and offers a set of tools and techniques that allows reducing losses significantly and making the process cheaper and faster. Economical production tools are simple solutions that allow one to see opportunities for improvement of all aspects of the business, to reduce losses significantly, to constantly improve the whole spectrum of business processes, to increase significantly the transparency and manageability of the organization, to take advantage of the potential of each employee of the company, to increase competitiveness, and to obtain significant economic benefits without making large financial expenditures. Each of economical production tools solves a specific part of the problems, and only application of their combination will allow one to solve the problem or minimize it to acceptable values. The research of the governance process project "Lean Production" permitted studying the methods and tools of lean production and developing measures for their improvement.

  8. Project-based teaching in health informatics: a course on health care quality improvement.

    PubMed

    Moehr, J R; Berenji, G R; Green, C J; Kagolovsky, Y

    2001-01-01

    Teaching the skills and knowledge required in health informatics [1] is a challenge because the skill of applying knowledge in real life requires practice. We relate the experience with introducing a practice component to a course in "Health Care Quality Improvement". Working health care professionals were invited to bring an actual quality problem from their place of work and to work alongside students in running the problem through a quality improvement project lifecycle. Multiple technological and process oriented teaching innovations were employed including project sessions in observation rooms, video recording of these sessions, generation of demonstration examples and distance education components. Both students and their collaborators from the work place developed proficiency in applying quality improvement methods as well as in experiencing the realities of group processes, information gaps and organizational constraints. The principles used to achieve high involvement of the whole class, the employed resources and technical support are described. The resulting academic and practical achievements are discussed in relation to the alternative instructional modalities, and with respect to didactic implications for similar endeavors and beyond to other fields such as systems engineering.

  9. A practical guide to applying lean tools and management principles to health care improvement projects.

    PubMed

    Simon, Ross W; Canacari, Elena G

    2012-01-01

    Manufacturing organizations have used Lean management principles for years to help eliminate waste, streamline processes, and cut costs. This pragmatic approach to structured problem solving can be applied to health care process improvement projects. Health care leaders can use a step-by-step approach to document processes and then identify problems and opportunities for improvement using a value stream process map. Leaders can help a team identify problems and root causes and consider additional problems associated with methods, materials, manpower, machinery, and the environment by using a cause-and-effect diagram. The team then can organize the problems identified into logical groups and prioritize the groups by impact and difficulty. Leaders must manage action items carefully to instill a sense of accountability in those tasked to complete the work. Finally, the team leaders must ensure that a plan is in place to hold the gains. Copyright © 2012 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  10. Sensitivity analysis of the add-on price estimate for the silicon web growth process

    NASA Technical Reports Server (NTRS)

    Mokashi, A. R.

    1981-01-01

    The web growth process, a silicon-sheet technology option, developed for the flat plate solar array (FSA) project, was examined. Base case data for the technical and cost parameters for the technical and commercial readiness phase of the FSA project are projected. The process add on price, using the base case data for cost parameters such as equipment, space, direct labor, materials and utilities, and the production parameters such as growth rate and run length, using a computer program developed specifically to do the sensitivity analysis with improved price estimation are analyzed. Silicon price, sheet thickness and cell efficiency are also discussed.

  11. The Reflective Macintosh: A Computer-Assisted Approach to Understanding and Improving Managerial Practice. Project Report.

    ERIC Educational Resources Information Center

    Kerchner, Charles; And Others

    The early stages of a microcomputer-based project to integrate managerial knowledge and practice are described in this report. Analysis of the problem-framing process that effective principals use to reduce complex problems into more manageable ones forms the basis of the project. Three cognitive-mapping techniques are used to understand the…

  12. A Comparison of Biologic Content in Three Elementary-School Science Curriculum Projects: ESS, S-APA, SCIS

    ERIC Educational Resources Information Center

    Simpson, Ronald D.

    1974-01-01

    Three elementary school science curriculum projects, Elementary Science Study (ESS), Science - A Process Approach (S-APA), and Science Curriculum Improvement Study (SCIS), are compared concerning the biologic content each project contains. The reviewer found a lack of activities designed to represent functions at the cellular level. Two projects…

  13. Web-Based Predictive Analytics to Improve Patient Flow in the Emergency Department

    NASA Technical Reports Server (NTRS)

    Buckler, David L.

    2012-01-01

    The Emergency Department (ED) simulation project was established to demonstrate how requirements-driven analysis and process simulation can help improve the quality of patient care for the Veterans Health Administration's (VHA) Veterans Affairs Medical Centers (VAMC). This project developed a web-based simulation prototype of patient flow in EDs, validated the performance of the simulation against operational data, and documented IT requirements for the ED simulation.

  14. Improved InGaN LED System Efficacy and Cost via Droop Reduction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wildeson, Isaac

    Efficiency droop is a non-thermal process intrinsic to indium gallium nitride light emitting diodes (LEDs) in which the external quantum efficiency (EQE) decreases with increasing drive current density. Mitigating droop would allow one to reduce the size of LEDs driven at a given current or to drive LEDs of given size at higher current while maintaining high efficiencies. In other words, droop mitigation can lead to significant gains in light output per dollar and/or light output per watt of input power. This project set an EQE improvement goal at high drive current density which was to be attained by improvingmore » the LED active region design and growth process following a droop mitigation strategy. The interactions between LED active region design parameters and efficiency droop were studied by modeling and experiments. The crystal defects that tend to form in more complex LED designs intended to mitigate droop were studied with advanced characterization methods that provided insight into the structural and electronic properties of the material. This insight was applied to improve the epitaxy process both in terms of active region design and optimization of growth parameters. The final project goals were achieved on schedule and an epitaxy process leading to LEDs with EQE exceeding the project target was demonstrated.« less

  15. Using Six Sigma methodology to reduce patient transfer times from floor to critical-care beds.

    PubMed

    Silich, Stephan J; Wetz, Robert V; Riebling, Nancy; Coleman, Christine; Khoueiry, Georges; Abi Rafeh, Nidal; Bagon, Emma; Szerszen, Anita

    2012-01-01

    In response to concerns regarding delays in transferring critically ill patients to intensive care units (ICU), a quality improvement project, using the Six Sigma process, was undertaken to correct issues leading to transfer delay. To test the efficacy of a Six Sigma intervention to reduce transfer time and establish a patient transfer process that would effectively enhance communication between hospital caregivers and improve the continuum of care for patients. The project was conducted at a 714-bed tertiary care hospital in Staten Island, New York. A Six Sigma multidisciplinary team was assembled to assess areas that needed improvement, manage the intervention, and analyze the results. The Six Sigma process identified eight key steps in the transfer of patients from general medical floors to critical care areas. Preintervention data and a root-cause analysis helped to establish the goal transfer-time limits of 3 h for any individual transfer and 90 min for the average of all transfers. The Six Sigma approach is a problem-solving methodology that resulted in almost a 60% reduction in patient transfer time from a general medical floor to a critical care area. The Six Sigma process is a feasible method for implementing healthcare related quality of care projects, especially those that are complex. © 2011 National Association for Healthcare Quality.

  16. Country watch: Central African Republic (CAR).

    PubMed

    Aubel, J; Sobela, F; Voga, P

    1997-01-01

    This article describes the activities of the Community Peer AIDS Education Project, initiated in 1995 in the Central African Republic (CAR). The CAR project was created by the National AIDS Committee (NAC) and the US Peace Corps. A 4-day workshop was held at the onset for project staff and consultants. Staff developed a simple monitoring and evaluation (M&E) system that emphasizes "learning." M&E schemes measure project outputs, expenditures, and other measures of program implementation in order to help staff gradually improve implementation. M&E helps staff document activities, share information, and learn from the implementation process. Project activities are documented by maintaining community logbooks, taking photos of significant aspects of the educational activities, and leading informal discussion groups. The CAR project engaged in sharing and learning activities by holding meetings with peer leaders, team meetings, meetings with project managers, and meetings with the NAC. Once a month, peer field coordinators conducted a structured exercise with peer leaders. One aim was to gain their feedback on the successes and constraints of activities. Another was to make suggestions on how to improve activities. These structured exercises are recorded as lessons learned in a project book. Team meetings are held periodically. During meetings, staff review project books and photos and discuss successes and problems encountered. Project manager meetings provide time to share lessons learned and to suggest project strengthening options. NAC meetings between the project manager and field coordinators allow for a bottom-up learning process. CAR project staff were receptive to M&E efforts.

  17. Evaluation of the Three Gorges Dam project using multi-criteria analysis (MCA) based on a sustainable perspective

    NASA Astrophysics Data System (ADS)

    Han, Yue; Zheng, Wei; Guo, Junshan; Ma, Yihe; Ding, Junqi; Zhu, Lingkai; Che, Yongqiang; Zhang, Yanpeng

    2018-02-01

    Abstract . The Three Gorges dam of China is one of the largest and expensive hydropower projects of the world. The four main purposes of the project are flood control,energy production, improved navigation and fresh water supply. The dam project has been completed and running successfully with the potential benefits. However, this project is still a controversial issue among many environmentalists and socialists due to various impacts. This study focuses on the benefit and the impacts of the project, and also evaluates the performance of the project using multi-criteria analysis (MCA) approach from a sustainable perspective. Different sustainability criteria related with the dam project have been identified and used for the ranking and rating process. The final result of MCA comes with this scoring process and pairwise comparison, which evaluates the performance of the project considering different positive and negative aspects.

  18. Stratospheric Aerosol and Gas Experiment, SAGE III on ISS, An Earth Science Mission on the International Space Station, Schedule Risk Analysis, A Project Perspective

    NASA Technical Reports Server (NTRS)

    Bonine, Lauren

    2015-01-01

    The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.

  19. The uncertainty of crop yield projections is reduced by improved temperature response functions.

    PubMed

    Wang, Enli; Martre, Pierre; Zhao, Zhigan; Ewert, Frank; Maiorano, Andrea; Rötter, Reimund P; Kimball, Bruce A; Ottman, Michael J; Wall, Gerard W; White, Jeffrey W; Reynolds, Matthew P; Alderman, Phillip D; Aggarwal, Pramod K; Anothai, Jakarat; Basso, Bruno; Biernath, Christian; Cammarano, Davide; Challinor, Andrew J; De Sanctis, Giacomo; Doltra, Jordi; Fereres, Elias; Garcia-Vila, Margarita; Gayler, Sebastian; Hoogenboom, Gerrit; Hunt, Leslie A; Izaurralde, Roberto C; Jabloun, Mohamed; Jones, Curtis D; Kersebaum, Kurt C; Koehler, Ann-Kristin; Liu, Leilei; Müller, Christoph; Naresh Kumar, Soora; Nendel, Claas; O'Leary, Garry; Olesen, Jørgen E; Palosuo, Taru; Priesack, Eckart; Eyshi Rezaei, Ehsan; Ripoche, Dominique; Ruane, Alex C; Semenov, Mikhail A; Shcherbak, Iurii; Stöckle, Claudio; Stratonovitch, Pierre; Streck, Thilo; Supit, Iwan; Tao, Fulu; Thorburn, Peter; Waha, Katharina; Wallach, Daniel; Wang, Zhimin; Wolf, Joost; Zhu, Yan; Asseng, Senthold

    2017-07-17

    Increasing the accuracy of crop productivity estimates is a key element in planning adaptation strategies to ensure global food security under climate change. Process-based crop models are effective means to project climate impact on crop yield, but have large uncertainty in yield simulations. Here, we show that variations in the mathematical functions currently used to simulate temperature responses of physiological processes in 29 wheat models account for >50% of uncertainty in simulated grain yields for mean growing season temperatures from 14 °C to 33 °C. We derived a set of new temperature response functions that when substituted in four wheat models reduced the error in grain yield simulations across seven global sites with different temperature regimes by 19% to 50% (42% average). We anticipate the improved temperature responses to be a key step to improve modelling of crops under rising temperature and climate change, leading to higher skill of crop yield projections.

  20. The Uncertainty of Crop Yield Projections Is Reduced by Improved Temperature Response Functions

    NASA Technical Reports Server (NTRS)

    Wang, Enli; Martre, Pierre; Zhao, Zhigan; Ewert, Frank; Maiorano, Andrea; Rotter, Reimund P.; Kimball, Bruce A.; Ottman, Michael J.; White, Jeffrey W.; Reynolds, Matthew P.; hide

    2017-01-01

    Increasing the accuracy of crop productivity estimates is a key element in planning adaptation strategies to ensure global food security under climate change. Process-based crop models are effective means to project climate impact on crop yield, but have large uncertainty in yield simulations. Here, we show that variations in the mathematical functions currently used to simulate temperature responses of physiological processes in 29 wheat models account for is greater than 50% of uncertainty in simulated grain yields for mean growing season temperatures from 14 C to 33 C. We derived a set of new temperature response functions that when substituted in four wheat models reduced the error in grain yield simulations across seven global sites with different temperature regimes by 19% to 50% (42% average). We anticipate the improved temperature responses to be a key step to improve modelling of crops under rising temperature and climate change, leading to higher skill of crop yield projections.

  1. Performance Management and Optimization of Semiconductor Design Projects

    NASA Astrophysics Data System (ADS)

    Hinrichs, Neele; Olbrich, Markus; Barke, Erich

    2010-06-01

    The semiconductor industry is characterized by fast technological changes and small time-to-market windows. Improving productivity is the key factor to stand up to the competitors and thus successfully persist in the market. In this paper a Performance Management System for analyzing, optimizing and evaluating chip design projects is presented. A task graph representation is used to optimize the design process regarding time, cost and workload of resources. Key Performance Indicators are defined in the main areas cost, profit, resources, process and technical output to appraise the project.

  2. Simulation of generation of new ideas for new product development and IT services

    NASA Astrophysics Data System (ADS)

    Nasiopoulos, Dimitrios K.; Sakas, Damianos P.; Vlachos, D. S.; Mavrogianni, Amanda

    2015-02-01

    This paper describes a dynamic model of the New Product Development (NPD) process. The model has been occurring from best practice noticed in our research conducted at a range of situations. The model contributes to determine and put an IT company's NPD activities into the frame of the overall NPD process[1]. It has been found to be a useful tool for organizing data on IT company's NPD activities without enforcement an excessively restrictive research methodology refers to the model of NPD. The framework, which strengthens the model, will help to promote a research of the methods undertaken within an IT company's NPD process, thus promoting understanding and improvement of the simulation process[2]. IT companies tested many techniques with several different practices designed to improve the validity and efficacy of their NPD process[3]. Supported by the model, this research examines how widely accepted stated tactics are and what impact these best tactics have on NPD performance. The main assumption of this study is that simulation of generation of new ideas[4] will lead to greater NPD effectiveness and more successful products in IT companies. With the model implementation, practices concern the implementation strategies of NPD (product selection, objectives, leadership, marketing strategy and customer satisfaction) are all more widely accepted than best practices related with controlling the application of NPD (process control, measurements, results). In linking simulation with impact, our results states product success depends on developing strong products and ensuring organizational emphasis, through proper project selection. Project activities strengthens both product and project success. IT products and services success also depends on monitoring the NPD procedure through project management and ensuring team consistency with group rewards. Sharing experiences between projects can positively influence the NPD process.

  3. Orienting and Onboarding Clinical Nurse Specialists: A Process Improvement Project.

    PubMed

    Garcia, Mayra G; Watt, Jennifer L; Falder-Saeed, Karie; Lewis, Brennan; Patton, Lindsey

    Clinical nurse specialists (CNSs) have a unique advanced practice role. This article describes a process useful in establishing a comprehensive orientation and onboarding program for a newly hired CNS. The project team used the National Association of Clinical Nurse Specialists core competencies as a guide to construct a process for effectively onboarding and orienting newly hired CNSs. Standardized documents were created for the orientation process including a competency checklist, needs assessment template, and professional evaluation goals. In addition, other documents were revised to streamline the orientation process. Standardizing the onboarding and orientation process has demonstrated favorable results. As of 2016, 3 CNSs have successfully been oriented and onboarded using the new process. Unique healthcare roles require special focus when onboarding and orienting into a healthcare system. The use of the National Association of Clinical Nurse Specialists core competencies guided the project in establishing a successful orientation and onboarding process for newly hired CNSs.

  4. Improving patient satisfaction with pain management using Six Sigma tools.

    PubMed

    DuPree, Erin; Martin, Lisa; Anderson, Rebecca; Kathuria, Navneet; Reich, David; Porter, Carol; Chassin, Mark R

    2009-07-01

    Patient satisfaction as a direct and public measure of quality of care is changing the way hospitals address quality improvement. The feasibility of using the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) methodology to improve patient satisfaction as it relates to pain management was evaluated. This project used the DMAIC methodology to improve patients' overall satisfaction with pain management on two inpatient units in an urban academic medical center. Pre- and postintervention patient surveys were conducted. The DMAIC methodology provided a data-driven structure to determine the optimal improvement strategies, as well as a long-term plan for maintaining any improvements. In addition, the Change Acceleration Process (CAP) was used throughout the project's various DMAIC stages to further the work of the team by creating a shared need to meet the objectives of the project. Overall satisfaction with pain management "excellent" ratings increased from 37% to 54%. Both units surpassed the goal of at least 50% of responses in the "excellent" category. Several key drivers of satisfaction with pain management were uncovered in the Analyze phase of the project, and each saw rating increases from the pre-intervention to postintervention surveys. Ongoing monitoring by the hospital inpatient satisfaction survey showed that the pain satisfaction score improved in subsequent quarters as compared with the pre-intervention period. The Six Sigma DMAIC methodology can be used successfully to improve patient satisfaction. The project led to measurable improvements in patient satisfaction with pain management, which have endured past the duration of the Six Sigma project. The Control phase of DMAIC allows the improvements to be incorporated into daily operations.

  5. Project inspection using mobile technology - phase I : an investigation into existing business processes and areas for improvement using mobile technology.

    DOT National Transportation Integrated Search

    2013-08-01

    As mobile technology becomes widely available and affordable, transportation agencies can use this technology to : streamline operations involved within project inspection. This research, conducted in two phases, identified : opportunities for proces...

  6. Got (the Right) Milk? How a Blended Quality Improvement Approach Catalyzed Change.

    PubMed

    Luton, Alexandra; Bondurant, Patricia G; Campbell, Amy; Conkin, Claudia; Hernandez, Jae; Hurst, Nancy

    2015-10-01

    The expression, storage, preparation, fortification, and feeding of breast milk are common ongoing activities in many neonatal intensive care units (NICUs) today. Errors in breast milk administration are a serious issue that should be prevented to preserve the health and well-being of NICU babies and their families. This paper describes how a program to improve processes surrounding infant feeding was developed, implemented, and evaluated. The project team used a blended quality improvement approach that included the Model for Improvement, Lean and Six Sigma methodologies, and principles of High Reliability Organizations to identify and drive short-term, medium-term, and long-term improvement strategies. Through its blended quality improvement approach, the team strengthened the entire dispensation system for both human milk and formula and outlined a clear vision and plan for further improvements as well. The NICU reduced feeding errors by 83%. Be systematic in the quality improvement approach, and apply proven methods to improving processes surrounding infant feeding. Involve expert project managers with nonclinical perspective to guide work in a systematic way and provide unbiased feedback. Create multidisciplinary, cross-departmental teams that include a vast array of stakeholders in NICU feeding processes to ensure comprehensive examination of current state, identification of potential risks, and "outside the box" potential solutions. As in the realm of pharmacy, the processes involved in preparing feedings for critically ill infants should be carried out via predictable, reliable means including robust automated verification that integrates seamlessly into existing processes. The use of systems employed in pharmacy for medication preparation should be considered in the human milk and formula preparation setting.

  7. Effect of pavement resurfacing on traffic safety.

    DOT National Transportation Integrated Search

    2004-02-01

    The objectives of this study were to analyze the before and after crash history and speeds on routes which have been resurfaced , inspect resurfacing projects, make recommendations to improve the resurfacing process, and determine improvements which ...

  8. Demonstration of Advanced CO 2 Capture Process Improvements for Coal-Fired Flue Gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carroll, John

    This document summarizes the activities of Cooperative Agreement DE-FE0026590, “Demonstration of Advanced CO 2 Capture Process Improvements for Coal-Fired Flue Gas” during the performance period of October 1, 2015 through May 31, 2017. This project was funded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL). Southern Company Services, Inc. (SCS) was the prime contractor and co-funder of the project. Mitsubishi Heavy Industries America (MHIA) and AECOM were project team members. The overall project objective was to improve costs, energy requirements, and performance of an existing amine-based CO 2 capture process. This will occur via improvements inmore » three areas: 1. Reboiler design – The first objective of the program was to demonstrate performance of an integrated stripper/reboiler (termed Built-in Reboiler, or BIR) to reduce footprint, capital costs, and integration issues of the current technology. 2. Particulate management – The second objective was to carry out a Particulate Matter Management (PMM) test. This has the potential to reduce operating costs and capital costs due to the reduced or eliminated need for mechanical filtration. 3. Solvent – The third objective was to carry out a new solvent test plan (referred to as NSL) to demonstrate a new solvent (termed New Solvent A), which is expected to reduce regeneration steam. The bulk price is also expected to be lower than KS-1, which is the current solvent used in this process. NSL testing would include baseline testing, optimization, long term testing, solvent reclamation testing, and final inspection. These combine to form the Advanced Carbon Capture (ACC) technology. Much of this work will be applicable to generic solvent processes, especially in regards to improved reboiler design, and focused to meet or exceed the DOE’s overall carbon capture performance goals of 90% CO 2 capture rate with 95% CO 2 purity at a cost of $40/tonne of CO 2 by 2025 and at a cost of electricity (COE) 30% less than baseline CO 2 capture approaches by 2030. This project was divided into two phases. Phase 1 is the planning phase, and Phase 2 is the construction, operations, testing, and analysis phase. A down select occurred after Phase 1. Phase 1 activities were carried out during this reporting period, and therefore, Phase 1 activities are solely considered in this report. The project was not selected for Phase 2 funding.« less

  9. NGS' GRAV-D Project Brings Advances in Aerogravimetry

    NASA Astrophysics Data System (ADS)

    Childers, V. A.; Preaux, S. A.; Diehl, T. M.; Li, X.; Weil, C.

    2011-12-01

    NOAA's National Geodetic Survey has undertaken an extensive airborne gravity campaign to help replace the nation's vertical datum by 2022. After receiving Congressional funding in FY10 &11, the GRAV-D project has now surveyed 13.45% of the total area (as of abstract submittal time). The survey has now worked on a number of aircraft, both jets and turboprops. Early work was performed at 35,000 ft and 280 kts. Since summer of 2009, the survey altitude has been lowered to 20,000 ft to enhance signal recovery and to reduce the amplitude enhancement of noise in the downward continuation needed for gravity field blending. The high altitude and speed of the survey has forced a re-evaluation of all aspects of the airborne gravity processing methodology. This presentation will update the community on the progress of the project, summarize the various processing improvements implemented, and discuss the magnitude of their effects. Improvements and research include: a new in-house gravity processing software package called "Newton", kinematic GPS processing variables and their impacts on final gravity products, and evaluation of gravimeter off-level corrections, among other topics.

  10. SAGA: A project to automate the management of software production systems

    NASA Technical Reports Server (NTRS)

    Campbell, Roy H.; Beckman-Davies, C. S.; Benzinger, L.; Beshers, G.; Laliberte, D.; Render, H.; Sum, R.; Smith, W.; Terwilliger, R.

    1986-01-01

    Research into software development is required to reduce its production cost and to improve its quality. Modern software systems, such as the embedded software required for NASA's space station initiative, stretch current software engineering techniques. The requirements to build large, reliable, and maintainable software systems increases with time. Much theoretical and practical research is in progress to improve software engineering techniques. One such technique is to build a software system or environment which directly supports the software engineering process, i.e., the SAGA project, comprising the research necessary to design and build a software development which automates the software engineering process. Progress under SAGA is described.

  11. Software Process Improvement Journey: IBM Australia Application Management Services

    DTIC Science & Technology

    2005-03-01

    learned from its successes and mistakes and then applied that learning to the next project . 28 CMU/SEI-2005-TR...worldwide re- quirements for project management and quality; it was the organization’s staff members who played a part in the development of the ...environ- ment and that it involves personnel from a variety of areas, ideally not part of the group that developed the technology or process

  12. Continuous quality improvement for continuity of care.

    PubMed

    Kibbe, D C; Bentz, E; McLaughlin, C P

    1993-03-01

    Continuous quality improvement (CQI) techniques have been used most frequently in hospital operations such as pharmaceutical ordering, patient admitting, and billing of insurers, and less often to analyze and improve processes that are close to the clinical interaction of physicians and their patients. This paper describes a project in which CQI was implemented in a family practice setting to improve continuity of care. A CQI study team was assembled in response to patients' complaints about not being able to see their regular physician providers when they wanted. Following CQI methods, the performance of the practice in terms of provider continuity was measured. Two "customer" groups were surveyed: physician faculty members were surveyed to assess their attitudes about continuity, and patients were surveyed about their preferences for provider continuity and convenience factors. Process improvements were selected in the critical pathways that influence provider continuity. One year after implementation of selected process improvements, repeat chart audit showed that provider continuity levels had improved from .45 to .74, a 64% increase from 1 year earlier. The project's main accomplishment was to establish the practicality of using CQI methods in a primary care setting to identify a quality issue of value to both providers and patients, in this case, continuity of provider care, and to identify processes that linked the performance of health care delivery procedures with patient expectations.

  13. Quality initiatives: improving patient flow for a bone densitometry practice: results from a Mayo Clinic radiology quality initiative.

    PubMed

    Aakre, Kenneth T; Valley, Timothy B; O'Connor, Michael K

    2010-03-01

    Lean Six Sigma process improvement methodologies have been used in manufacturing for some time. However, Lean Six Sigma process improvement methodologies also are applicable to radiology as a way to identify opportunities for improvement in patient care delivery settings. A multidisciplinary team of physicians and staff conducted a 100-day quality improvement project with the guidance of a quality advisor. By using the framework of DMAIC (define, measure, analyze, improve, and control), time studies were performed for all aspects of patient and technologist involvement. From these studies, value stream maps for the current state and for the future were developed, and tests of change were implemented. Comprehensive value stream maps showed that before implementation of process changes, an average time of 20.95 minutes was required for completion of a bone densitometry study. Two process changes (ie, tests of change) were undertaken. First, the location for completion of a patient assessment form was moved from inside the imaging room to the waiting area, enabling patients to complete the form while waiting for the technologist. Second, the patient was instructed to sit in a waiting area immediately outside the imaging rooms, rather than in the main reception area, which is far removed from the imaging area. Realignment of these process steps, with reduced technologist travel distances, resulted in a 3-minute average decrease in the patient cycle time. This represented a 15% reduction in the initial patient cycle time with no change in staff or costs. Radiology process improvement projects can yield positive results despite small incremental changes.

  14. Translating 10 lessons from lean six sigma project in paper-based training site to electronic health record-based primary care practice: challenges and opportunities.

    PubMed

    Aleem, Sohaib

    2013-01-01

    Lean Six Sigma is a well-proven methodology to enhance the performance of any business, including health care. The strategy focuses on cutting out waste and variation from the processes to improve the value and efficiency of work. This article walks through the journey of "green belt" training using a Lean Six Sigma approach and the implementation of a process improvement project that focused on wait time for patients to be examined in an urban academic primary care clinic without requiring added resources. Experiences of the training and the project at an urban paper-based satellite clinic have informed the planning efforts of a data and performance team, including implementing a 15-minute nurse "pre-visit" at primary care sites of an accountable care organization.

  15. Flat-plate solar array project. Volume 3: Silicon sheet: Wafers and ribbons

    NASA Technical Reports Server (NTRS)

    Briglio, A.; Dumas, K.; Leipold, M.; Morrison, A.

    1986-01-01

    The primary objective of the Silicon Sheet Task of the Flat-Plate Solar Array (FSA) Project was the development of one or more low cost technologies for producing silicon sheet suitable for processing into cost-competitive solar cells. Silicon sheet refers to high purity crystalline silicon of size and thickness for fabrication into solar cells. Areas covered in the project were ingot growth and casting, wafering, ribbon growth, and other sheet technologies. The task made and fostered significant improvements in silicon sheet including processing of both ingot and ribbon technologies. An additional important outcome was the vastly improved understanding of the characteristics associated with high quality sheet, and the control of the parameters required for higher efficiency solar cells. Although significant sheet cost reductions were made, the technology advancements required to meet the task cost goals were not achieved.

  16. A longitudinal, collaborative, practice-based learning and improvement model to improve post-discharge heart failure outcomes.

    PubMed

    Anagnostou, Valsamo K; Bailey, Grant; Sze, Edward; Hay, Seonaid; Hyson, Anne; Federman, Daniel G

    2014-01-01

    Practice-based learning and improvement is one of the Accreditation Council of Graduate Medical Education's core competencies fortrainees. Residencyprograms have grappled with how to accomplish this goal. We describe our institution's unique, longitudinal post-graduate year process and project. West Haven, VA Medical Center. Yale University School of Medicine junior residents on ambulatory electives and faculty preceptor. Longitudinal program aimed to decrease re-admissions for hospitalized patients with congestive heart failure. We feel that our longitudinal project is a novel innovation worthy of further study.

  17. Best practice guidelines for stroke in Cameroon: An innovative and participatory knowledge translation project.

    PubMed

    Cockburn, Lynn; Fanfon, Timothy N; Bramall, Alexa; Ngole, Eta M; Kuwoh, Pius; Anjonga, Emmanuel; Difang, Brenda M E; Kiani, Shirin; Muso, Petra S; Trivedi, Navjyot; Sama, Julius; Teboh, Sylvian

    2014-01-01

    Although the adherence to stroke guidelines in high-income countries has been shown to be associated with improved patient outcomes, the research, development and implementation of rehabilitation related guidelines in African countries is lacking. The purpose of this article is to describe how a group of front-line practitioners collaborated with academics and students to develop best practice guidelines (BPG) for the management and rehabilitation of stroke in adult patients in Cameroon. A working group was established and adapted internationally recognised processes for the development of best practice guidelines. The group determined the scope of the guidelines, documented current practices, and critically appraised evidence to develop guidelines relevant to the Cameroon context. The primary result of this project is best practice guidelines which provided an overview of the provision of stroke rehabilitation services in the region, and made 83 practice recommendations to improve these services. We also report on the successes and challenges encountered during the process, and the working group's recommendations aimed at encouraging others to consider similar projects. This project demonstrated that there is interest and capacity for improving stroke rehabilitation practices and for stroke guideline development in Africa.

  18. An electromagnetic induction method for underground target detection and characterization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartel, L.C.; Cress, D.H.

    1997-01-01

    An improved capability for subsurface structure detection is needed to support military and nonproliferation requirements for inspection and for surveillance of activities of threatening nations. As part of the DOE/NN-20 program to apply geophysical methods to detect and characterize underground facilities, Sandia National Laboratories (SNL) initiated an electromagnetic induction (EMI) project to evaluate low frequency electromagnetic (EM) techniques for subsurface structure detection. Low frequency, in this case, extended from kilohertz to hundreds of kilohertz. An EMI survey procedure had already been developed for borehole imaging of coal seams and had successfully been applied in a surface mode to detect amore » drug smuggling tunnel. The SNL project has focused on building upon the success of that procedure and applying it to surface and low altitude airborne platforms. Part of SNL`s work has focused on improving that technology through improved hardware and data processing. The improved hardware development has been performed utilizing Laboratory Directed Research and Development (LDRD) funding. In addition, SNL`s effort focused on: (1) improvements in modeling of the basic geophysics of the illuminating electromagnetic field and its coupling to the underground target (partially funded using LDRD funds) and (2) development of techniques for phase-based and multi-frequency processing and spatial processing to support subsurface target detection and characterization. The products of this project are: (1) an evaluation of an improved EM gradiometer, (2) an improved gradiometer concept for possible future development, (3) an improved modeling capability, (4) demonstration of an EM wave migration method for target recognition, and a demonstration that the technology is capable of detecting targets to depths exceeding 25 meters.« less

  19. A Framework for Six Sigma Project Selection in Higher Educational Institutions, Using a Weighted Scorecard Approach

    ERIC Educational Resources Information Center

    Holmes, Monica C.; Jenicke, Lawrence O.; Hempel, Jessica L.

    2015-01-01

    Purpose: This paper discusses the importance of the Six Sigma selection process, describes a Six Sigma project in a higher educational institution and presents a weighted scorecard approach for project selection. Design/Methodology/Approach: A case study of the Six Sigma approach being used to improve student support at a university computer help…

  20. The project management office: transforming healthcare in the context of a hospital redevelopment project.

    PubMed

    Richer, Marie-Claire; Marchionni, Caroline; Lavoie-Tremblay, Melanie; Aubry, Monique

    2013-01-01

    It has been shown that classifying projects into a typology allows improved allocation of resources and promotes project success. However, a typology of healthcare projects has yet to be developed. The projects encountered by the Transition Support Office at the McGill University Health Centre in Montreal, Quebec, where a major redevelopment project is under way, were classified into a typology unique to the healthcare context. Examples of the 3 project types, Process, People, and Practice, are provided to clarify the specific support strategies and context-adapted interventions that were instrumental to their success.

  1. AIR TOXICS ASSESSMENT REFINEMENT IN RAPCA'S JURISDICTION - DAYTON, OH AREA

    EPA Science Inventory

    RAPCA has receive two grants to conduct this project. As part of the original project, RAPCA has improved and expanded their point source inventory by converting the following area sources to point sources: dry cleaners, gasoline throughput processes and halogenated solvent clea...

  2. Transit grants : need for improved predictability, data, and monitoring in application processing

    DOT National Transportation Integrated Search

    2000-08-01

    The Federal Transit Administration (FTA) provides states, local and regional transportation providers, and others with grants for the construction, acquisition, improvement, and operation of transit systems and projects through a variety of programs....

  3. VA Construction: Improved Processes Needed to Monitor Contract Modifications, Develop Schedules, and Estimate Costs

    DTIC Science & Technology

    2017-03-01

    address challenges in managing projects to build medical facilities. In response to statutory requirements and additional congressional direction, VA...is outsourcing management of certain such projects to the U.S. Army Corps of Engineers (USACE). As of October 2016, VA had 23 ongoing projects...costing $100 million or more. VA and USACE have entered into interagency agreements for 12 of these 23 projects. The agreements entail USACE’s managing

  4. Improving data quality across 3 sub-Saharan African countries using the Consolidated Framework for Implementation Research (CFIR): results from the African Health Initiative.

    PubMed

    Gimbel, Sarah; Mwanza, Moses; Nisingizwe, Marie Paul; Michel, Cathy; Hirschhorn, Lisa

    2017-12-21

    High-quality data are critical to inform, monitor and manage health programs. Over the seven-year African Health Initiative of the Doris Duke Charitable Foundation, three of the five Population Health Implementation and Training (PHIT) partnership projects in Mozambique, Rwanda, and Zambia introduced strategies to improve the quality and evaluation of routinely-collected data at the primary health care level, and stimulate its use in evidence-based decision-making. Using the Consolidated Framework for Implementation Research (CFIR) as a guide, this paper: 1) describes and categorizes data quality assessment and improvement activities of the projects, and 2) identifies core intervention components and implementation strategy adaptations introduced to improve data quality in each setting. The CFIR was adapted through a qualitative theme reduction process involving discussions with key informants from each project, who identified two domains and ten constructs most relevant to the study aim of describing and comparing each country's data quality assessment approach and implementation process. Data were collected on each project's data quality improvement strategies, activities implemented, and results via a semi-structured questionnaire with closed and open-ended items administered to health management information systems leads in each country, with complementary data abstraction from project reports. Across the three projects, intervention components that aligned with user priorities and government systems were perceived to be relatively advantageous, and more readily adapted and adopted. Activities that both assessed and improved data quality (including data quality assessments, mentorship and supportive supervision, establishment and/or strengthening of electronic medical record systems), received higher ranking scores from respondents. Our findings suggest that, at a minimum, successful data quality improvement efforts should include routine audits linked to ongoing, on-the-job mentoring at the point of service. This pairing of interventions engages health workers in data collection, cleaning, and analysis of real-world data, and thus provides important skills building with on-site mentoring. The effect of these core components is strengthened by performance review meetings that unify multiple health system levels (provincial, district, facility, and community) to assess data quality, highlight areas of weakness, and plan improvements.

  5. Participatory science and innovation for improved sanitation and hygiene: process and outcome evaluation of project SHINE, a school-based intervention in Rural Tanzania.

    PubMed

    Hetherington, Erin; Eggers, Matthijs; Wamoyi, Joyce; Hatfield, Jennifer; Manyama, Mange; Kutz, Susan; Bastien, Sheri

    2017-02-07

    Diarrheal disease is a major cause of mortality and morbidity in low and middle income countries with children being disproportionately affected. Project SHINE (Sanitation & Hygiene INnovation in Education) is a grassroots participatory science education and social entrepreneurship model to engage youth and the wider community in the development of sustainable strategies to improve sanitation and hygiene. Based in rural and remote Tanzania, this pilot study engaged pastoralist high-school students and communities in the development and evaluation of culturally and contextually relevant strategies to improve sanitation and hygiene. Using a train-the-trainer approach, key activities included teacher workshops, school-based lessons, extra-curricular activities, community events and a One Health sanitation science fair which showcased projects related to water, sanitation and hygiene in relation to human and animal health. The process and outcome of the study were evaluated through qualitative interviews and focus group discussions with diverse project participants, as well as pre- and post- questionnaires completed by students on knowledge, attitudes and practices concerning sanitation and hygiene. The questionnaire results at baseline and follow-up showed statistically significant improvements on key measures including a decrease in unhygienic behaviors, an increase in the perceived importance of handwashing and intention to use the toilet, and increased communication in the social network about the importance of clean water and improved sanitation and hygiene practices, however there were no significant changes in sanitation related knowledge. Qualitative data highlighted strong leadership emerging from youth and enthusiasm from teachers and students concerning the overall approach in the project, including the use of participatory methods. There was a high degree of community engagement with hundreds of community members participating in school-based events. Sanitation science fair projects addressed a range of pastoralist questions and concerns regarding the relationship between water, sanitation and hygiene. Several projects, such as making soap from local materials, demonstrate potential as a sustainable strategy to improve health and livelihoods in the long-term. The Project SHINE model shows promise as an innovative capacity building approach and as an engagement and empowerment strategy for youth and communities to develop locally sustainable strategies to improve sanitation and hygiene.

  6. Increasing the Number of Outpatients Receiving Spiritual Assessment: A Pain and Palliative Care Service Quality Improvement Project.

    PubMed

    Gomez-Castillo, Blanca J; Hirsch, Rosemarie; Groninger, Hunter; Baker, Karen; Cheng, M Jennifer; Phillips, Jayne; Pollack, John; Berger, Ann M

    2015-11-01

    Spirituality is a patient need that requires special attention from the Pain and Palliative Care Service team. This quality improvement project aimed to provide spiritual assessment for all new outpatients with serious life-altering illnesses. Percentage of new outpatients receiving spiritual assessment (Faith, Importance/Influence, Community, Address/Action in care, psychosocial evaluation, chaplain consults) at baseline and postinterventions. Interventions included encouraging clinicians to incorporate adequate spiritual assessment into patient care and implementing chaplain covisits for all initial outpatient visits. The quality improvement interventions increased spiritual assessment (baseline vs. postinterventions): chaplain covisits (25.5% vs. 50%), Faith, Importance/Influence, Community, Address/Action in care completion (49% vs. 72%), and psychosocial evaluation (89% vs. 94%). Improved spiritual assessment in an outpatient palliative care clinic setting can occur with a multidisciplinary approach. This project also identifies data collection and documentation processes that can be targeted for improvement. Published by Elsevier Inc.

  7. Tailoring a response to youth binge drinking in an Aboriginal Australian community: a grounded theory study.

    PubMed

    McCalman, Janya; Tsey, Komla; Bainbridge, Roxanne; Shakeshaft, Anthony; Singleton, Michele; Doran, Christopher

    2013-08-07

    While Aboriginal Australian health providers prioritise identification of local community health needs and strategies, they do not always have the opportunity to access or interpret evidence-based literature to inform health improvement innovations. Research partnerships are therefore important when designing or modifying Aboriginal Australian health improvement initiatives and their evaluation. However, there are few models that outline the pragmatic steps by which research partners negotiate to develop, implement and evaluate community-based initiatives. The objective of this paper is to provide a theoretical model of the tailoring of health improvement initiatives by Aboriginal community-based service providers and partner university researchers. It draws from the case of the Beat da Binge community-initiated youth binge drinking harm reduction project in Yarrabah. A theoretical model was developed using the constructivist grounded theory methods of concurrent sampling, data collection and analysis. Data was obtained from the recordings of reflective Community-Based Participatory Research (CBPR) processes with Aboriginal community partners and young people, and university researchers. CBPR data was supplemented with interviews with theoretically sampled project participants. The transcripts of CBPR recordings and interviews were imported into NVIVO and coded to identify categories and theoretical constructs. The identified categories were then developed into higher order concepts and the relationships between concepts identified until the central purpose of those involved in the project and the core process that facilitated that purpose were identified. The tailored alcohol harm reduction project resulted in clarification of the underlying local determinants of binge drinking, and a shift in the project design from a social marketing awareness campaign (based on short-term events) to a more robust advocacy for youth mentoring into education, employment and training. The community-based process undertaken by the research partnership to tailor the design, implementation and evaluation of the project was theorised as a model incorporating four overlapping stages of negotiating knowledges and meanings to tailor a community response. The theoretical model can be applied in spaces where local Aboriginal and scientific knowledges meet to support the tailored design, implementation and evaluation of other health improvement projects, particularly those that originate from Aboriginal communities themselves.

  8. Development of Team Action Projects in Surgery (TAPS): a multilevel team-based approach to teaching quality improvement.

    PubMed

    Waits, Seth A; Reames, Bradley N; Krell, Robert W; Bryner, Benjamin; Shih, Terry; Obi, Andrea T; Henke, Peter K; Minter, Rebecca M; Englesbe, Michael J; Wong, Sandra L

    2014-01-01

    To meet the Accreditation Council for Graduate Medical Education core competency in Practice-Based Learning and Improvement, educational curricula need to address training in quality improvement (QI). We sought to establish a program to train residents in the principles of QI and to provide practical experiences in developing and implementing improvement projects. We present a novel approach for engaging students, residents, and faculty in QI efforts-Team Action Projects in Surgery (TAPS). Large academic medical center and health system. Multiple teams consisting of undergraduate students, medical students, surgery residents, and surgery faculty were assembled and QI projects developed. Using "managing to learn" Lean principles, these multilevel groups approached each project with robust data collection, development of an A3, and implementation of QI activities. A total of 5 resident led QI projects were developed during the TAPS pilot phase. These included a living kidney donor enhanced recovery protocol, consult improvement process, venous thromboembolism prophylaxis optimization, Clostridium difficile treatment standardization, and understanding variation in operative duration of laparoscopic cholecystectomy. Qualitative and quantitative assessment showed significant value for both the learner and stakeholders of QI related projects. Through the development of TAPS, we demonstrate a novel approach to addressing the increasing focus on QI within graduate medical education. Efforts to expand this multilevel team based approach would have value for teachers and learners alike. Copyright © 2014. Published by Elsevier Inc.

  9. Overview of Progress on the LANSCE Accelerator and Target Facilities Improvement Program

    NASA Astrophysics Data System (ADS)

    Macek, R. J.; Brun, T.; Donahue, J. B.; Fitzgerald, D. H.

    1997-05-01

    Three projects to improve the performance of the accelerator and target facilities for the Los Alamos Neutron Science Center have been initiated since 1994. The LANSCE Reliability Improvement Project was separated into two phases. Phase I, completed in 1995, was targeted at near-term improvements to beam availability that could be completed in a year. Phase II, now underway, consists of two projects: 1) converting the beam injection into the Proton Storage Ring (PSR) from the present two-step process H^- to H^0 to H^+) to direct injection of H^- beam in one step (H^- to H^+), and 2) an upgrade of the spallation neutron production target which will reduce the target change-out time from about a year to about three weeks. The third project, the SPSS Enhancement Project, is aimed at increasing the PSR output beam current from the present 70 μA at 20 Hz to 200 μA at 30 Hz, plus implementing seven new neutron scattering instruments. Objectives, plans, results and progress to date will be summarized.

  10. Software life cycle methodologies and environments

    NASA Technical Reports Server (NTRS)

    Fridge, Ernest

    1991-01-01

    Products of this project will significantly improve the quality and productivity of Space Station Freedom Program software processes by: improving software reliability and safety; and broadening the range of problems that can be solved with computational solutions. Projects brings in Computer Aided Software Engineering (CASE) technology for: Environments such as Engineering Script Language/Parts Composition System (ESL/PCS) application generator, Intelligent User Interface for cost avoidance in setting up operational computer runs, Framework programmable platform for defining process and software development work flow control, Process for bringing CASE technology into an organization's culture, and CLIPS/CLIPS Ada language for developing expert systems; and methodologies such as Method for developing fault tolerant, distributed systems and a method for developing systems for common sense reasoning and for solving expert systems problems when only approximate truths are known.

  11. Projecting effects of improvements in passive safety of the New Zealand light vehicle fleet.

    PubMed

    Keall, Michael; Newstead, Stuart; Jones, Wayne

    2007-09-01

    In the year 2000, as part of the process for setting New Zealand road safety targets, a projection was made for a reduction in social cost of 15.5 percent associated with improvements in crashworthiness, which is a measure of the occupant protection of the light passenger vehicle fleet. Since that document was produced, new estimates of crashworthiness have become available, allowing for a more accurate projection. The objective of this paper is to describe a methodology for projecting changes in casualty rates associated with passive safety features and to apply this methodology to produce a new prediction. The shape of the age distribution of the New Zealand light passenger vehicle fleet was projected to 2010. Projected improvements in crashworthiness and associated reductions in social cost were also modeled based on historical trends. These projections of changes in the vehicle fleet age distribution and of improvements in crashworthiness together provided a basis for estimating the future performance of the fleet in terms of secondary safety. A large social cost reduction of about 22 percent for 2010 compared to the year 2000 was predicted due to the expected huge impact of improvements in passive vehicle features on road trauma in New Zealand. Countries experiencing improvements in their vehicle fleets can also expect significant reductions in road injury compared to a less crashworthy passenger fleet. Such road safety gains can be analyzed using some of the methodology described here.

  12. Optimizing the Costs of Solid Sorbent-Based CO 2 Capture Process Through Heat Integration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sjostrom, Sharon

    2016-03-18

    The focus of this project was the ADAsorb™ CO 2 Capture Process, a temperature-swing adsorption process that incorporates a three-stage fluidized bed as the adsorber and a single-stage fluidized bed as the regenerator. ADAsorb™ system was designed, fabricated, and tested under DOE award DEFE0004343. Two amine-based sorbents were evaluated in conjunction with the ADAsorb™ process: “BN”, an ion-exchange resin; and “OJ”, a metal organic framework (MOF) sorbent. Two cross heat exchanger designs were evaluated for use between the adsorber and regenerator: moving bed and fluidized bed. The fluidized bed approach was rejected fairly early in the project because the additionalmore » electrical load to power blowers or fans to overcome the pressure drop required for fluidization was estimated to be nominally three times the electrical power that could be generated from the steam saved through the use of the cross heat exchanger. The Energy Research Center at Lehigh University built and utilized a process model of the ADAsorb™ capture process and integrated this model into an existing model of a supercritical PC power plant. The Lehigh models verified that, for the ADAsorb™ system, the largest contributor to parasitic power was lost electrical generation, which was primarily electric power which the host plant could not generate due to the extraction of low pressure (LP) steam for sorbent heating, followed by power for the CO 2 compressor and the blower or fan power required to fluidize the adsorber and regenerator. Sorbent characteristics such as the impacts of moisture uptake, optimized adsorption and regeneration temperature, and sensitivity to changes in pressure were also included in the modeling study. Results indicate that sorbents which adsorb more than 1-2% moisture by weight are unlikely to be cost competitive unless they have an extremely high CO 2 working capacity that well exceeds 15% by weight. Modeling also revealed that reductions in adsorber pressure drop could negatively affect the CO 2 adsorption characteristics for sorbents with certain isobar adsorption characteristics like sorbent BN. Thus, reductions in pressure drop do not provide the efficiency benefits expected. A techno-economic assessment conducted during the project revealed that without heat integration, the a metal organic framework (MOF) sorbent used in conjunction with the ADAsorb™ process provided the opportunity for improved performance over the benchmark MEA process. While the addition of a cross heat exchanger and heat integration was found to significantly improve net unit heat rate, the additional equipment costs required to realize these improvements almost always outweighed the improvement in performance. The exception to this was for a supported amine sorbent and the addition of a moving bed cross heat exchanger alone or in conjunction with waste heat from the compressor used for supplemental regenerator heating. Perhaps one of the most important points to be drawn from the work conducted during this project is the significant influence of sorbent characteristics alone on the projected COE and LCOE associated with the ADAsorb™ process, and the implications associated with future improvements to solid sorbent CO 2 capture. The results from this project suggest that solid sorbent CO 2 capture will continue to see performance gains and lower system costs as further sorbent improvements are realized.« less

  13. Advanced Exploration Systems Atmosphere Resource Recovery and Environmental Monitoring

    NASA Technical Reports Server (NTRS)

    Perry, J.; Abney, M.; Conrad, R.; Garber, A.; Howard, D.; Kayatin, M.; Knox, J.; Newton, R.; Parrish, K.; Roman, M.; hide

    2016-01-01

    In September 2011, the Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project was commissioned by NASA's Advanced Exploration Systems program to advance Atmosphere Revitalization Subsystem (ARS) and Environmental Monitoring Subsystem (EMS) technologies for enabling future crewed space exploration missions beyond low Earth orbit. The ARREM project's period of performance covered U.S. Government fiscal years 2012-2014. The ARREM project critically assessed the International Space Station (ISS) ARS and EMS architectures and process technologies as the foundation for an architecture suitable for deep space exploration vehicles. The project's technical content included technical tasks focused on improving the reliability and life cycle cost of ARS and EMS technologies as well as reducing future flight project developmental risk and design, development, test, and evaluation costs. Targeted technology development and maturation tasks, including key technical trade assessments, were accomplished and integrated ARS architectures were demonstrated. The ARREM project developed, demonstrated, and tested leading process technology candidates and subsystem architectures that met or exceeded key figures of merit, addressed capability gaps, and significantly improved the efficiency, safety, and reliability over the state-of-the-art ISS figures of merit. Promising EMS instruments were developed and functionally demonstrated in a simulated cabin environment. The project's technical approach and results are described and recommendations for continued development are provided.

  14. Quality improvement primer part 1: Preparing for a quality improvement project in the emergency department.

    PubMed

    Chartier, Lucas B; Cheng, Amy H Y; Stang, Antonia S; Vaillancourt, Samuel

    2018-01-01

    Emergency medicine (EM) providers work in a fast-paced and often hectic environment that has a high risk for patient safety incidents and gaps in the quality of care. These challenges have resulted in opportunities for frontline EM providers to play a role in quality improvement (QI) projects. QI has developed into a mature field with methodologies that can dramatically improve the odds of having a successful project with a sustainable impact. However, this expertise is not yet commonly taught during professional training. In this first of three articles meant as a QI primer for EM clinicians, we will introduce QI methodology and strategic planning using a fictional case study as an example. We will review how to identify a QI problem, define components of an effective problem statement, and identify stakeholders and core change team members. We will also describe three techniques used to perform root cause analyses-Ishikawa diagrams, Pareto charts and process mapping-and how they relate to preparing for a QI project. The next two papers in this series will focus on the execution of the QI project itself using rapid-cycle testing and on the evaluation and sustainability of QI projects.

  15. Medication room madness: calming the chaos.

    PubMed

    Conrad, Carole; Fields, Willa; McNamara, Tracey; Cone, Maryann; Atkins, Patricia

    2010-01-01

    Nurses work in stressful environments, encountering interruptions and distractions at almost every turn. The aim of this medication safety project was to improve the physical design and organizational layout of the medication room, reduce nurse interruptions and distractions, and create a standard medication process for enhanced patient safety and efficiency. This successful change improved the medication administration process, decreased medication errors, and enhanced nursing satisfaction.

  16. Empowering Oncology Nurses to Lead Change Through a Shared Governance Project.

    PubMed

    Gordon, Jeanine N

    2016-11-01

    Nurses at the bed- or chairside are knowledgeable about clinical and operational concerns that need improvement and, consequently, are in the best position to generate and evaluate practical options and potential solutions to improve efficacy and care processes. Implementation of a shared governance model is effective in engaging staff nurses to make meaningful and sustainable change in patient care processes.

  17. Patient safety in the clinical laboratory: a longitudinal analysis of specimen identification errors.

    PubMed

    Wagar, Elizabeth A; Tamashiro, Lorraine; Yasin, Bushra; Hilborne, Lee; Bruckner, David A

    2006-11-01

    Patient safety is an increasingly visible and important mission for clinical laboratories. Attention to improving processes related to patient identification and specimen labeling is being paid by accreditation and regulatory organizations because errors in these areas that jeopardize patient safety are common and avoidable through improvement in the total testing process. To assess patient identification and specimen labeling improvement after multiple implementation projects using longitudinal statistical tools. Specimen errors were categorized by a multidisciplinary health care team. Patient identification errors were grouped into 3 categories: (1) specimen/requisition mismatch, (2) unlabeled specimens, and (3) mislabeled specimens. Specimens with these types of identification errors were compared preimplementation and postimplementation for 3 patient safety projects: (1) reorganization of phlebotomy (4 months); (2) introduction of an electronic event reporting system (10 months); and (3) activation of an automated processing system (14 months) for a 24-month period, using trend analysis and Student t test statistics. Of 16,632 total specimen errors, mislabeled specimens, requisition mismatches, and unlabeled specimens represented 1.0%, 6.3%, and 4.6% of errors, respectively. Student t test showed a significant decrease in the most serious error, mislabeled specimens (P < .001) when compared to before implementation of the 3 patient safety projects. Trend analysis demonstrated decreases in all 3 error types for 26 months. Applying performance-improvement strategies that focus longitudinally on specimen labeling errors can significantly reduce errors, therefore improving patient safety. This is an important area in which laboratory professionals, working in interdisciplinary teams, can improve safety and outcomes of care.

  18. A quality improvement project to improve admission temperatures in very low birth weight infants.

    PubMed

    Lee, H C; Ho, Q T; Rhine, W D

    2008-11-01

    To review the results of a quality improvement (QI) project to improve admission temperatures of very low birth weight inborn infants. The neonatal intensive care unit at Lucile Packard Children's Hospital underwent a QI project to address hypothermic preterm newborns by staff education and implementing processes such as polyethylene wraps and chemical warming mattresses. We performed retrospective chart review of all inborn infants with birth weight <1500 g during the 18 months prior to (n=134) and 15 months after (n=170) the implementation period. Temperatures were compared between periods. Multivariable logistic regression was used to account for potential confounding variables. We compared mortality rates and grade 3 or 4 intraventricular hemorrhage rates between periods. The mean temperature rose from 35.4 to 36.2 degrees C (P<0.0001) after the QI project. The improvement was consistent and persisted over a 15-month period. After risk adjustment, the strongest predictor of hypothermia was being born in the period before implementation of the QI project (odds ratio 8.12, 95% confidence interval 4.63, 14.22). Although cesarean delivery was a strong risk factor for hypothermia prior to the project, it was no longer significant after the project. There was no significant difference in death or intraventricular hemorrhage detected between periods. There was a significant improvement in admission temperatures after a QI project, which persisted beyond the initial implementation period. Although there was no difference in mortality or intraventricular hemorrhage rates, we did not have sufficient power to detect small differences in these outcomes.

  19. Writing Plays Using Creative Problem-Solving.

    ERIC Educational Resources Information Center

    Raiser, Lynne; Hinson, Shirley

    1995-01-01

    This article describes a project which involved inner city elementary grade children with disabilities in writing and performing their own plays. A four-step playwriting process focuses on theme and character development, problem finding, and writing dialogue. The project has led to improved reading skills, attention, memory skills,…

  20. The process evaluation of It's Your Move!, an Australian adolescent community-based obesity prevention project.

    PubMed

    Mathews, Louise B; Moodie, Marj M; Simmons, Annie M; Swinburn, Boyd A

    2010-07-30

    Evidence on interventions for preventing unhealthy weight gain in adolescents is urgently needed. The aim of this paper is to describe the process evaluation for a three-year (2005-2008) project conducted in five secondary schools in the East Geelong/Bellarine region of Victoria, Australia. The project, 'It's Your Move!' aimed to reduce unhealthy weight gain by promoting healthy eating patterns, regular physical activity, healthy body weight, and body size perception amongst youth; and improve the capacity of families, schools, and community organisations to sustain the promotion of healthy eating and physical activity in the region. The project was supported by Deakin University (training and evaluation), a Reference Committee (strategic direction, budgetary approval and monitoring) and a Project Management Committee (project delivery). A workshop of students, teachers and other stakeholders formulated a 10-point action plan, which was then translated into strategies and initiatives specific to each school by the School Project Officers (staff members released from teaching duties one day per week) and trained Student Ambassadors. Baseline surveys informed intervention development. Process data were collected on all intervention activities and these were collated and enumerated, where possible, into a set of mutually exclusive tables to demonstrate the types of strategies and the dose, frequency and reach of intervention activities. The action plan included three guiding objectives, four on nutrition, two on physical activity and one on body image. The process evaluation data showed that a mix of intervention strategies were implemented, including social marketing, one-off events, lunch time and curriculum programs, improvements in infrastructure, and healthy school food policies. The majority of the interventions were implemented in schools and focused on capacity building and healthy eating strategies as physical activity practices were seen by the teachers as already meeting students' needs. While substantial health-promoting activities were conducted (especially related to healthy eating), there remain further opportunities for secondary schools to use a whole-of-school approach through the school curriculum, environment, policies and ethos to improve healthy eating, physical activity and healthy body perceptions in youth. To achieve this, significant, sustained leadership will be required within the education sector generally and within schools specifically.

  1. Facilitating comparative effectiveness research in cancer genomics: evaluating stakeholder perceptions of the engagement process

    PubMed Central

    Deverka, Patricia A; Lavallee, Danielle C; Desai, Priyanka J; Armstrong, Joanne; Gorman, Mark; Hole-Curry, Leah; O’Leary, James; Ruffner, BW; Watkins, John; Veenstra, David L; Baker, Laurence H; Unger, Joseph M; Ramsey, Scott D

    2013-01-01

    Aims The Center for Comparative Effectiveness Research in Cancer Genomics completed a 2-year stakeholder-guided process for the prioritization of genomic tests for comparative effectiveness research studies. We sought to evaluate the effectiveness of engagement procedures in achieving project goals and to identify opportunities for future improvements. Materials & methods The evaluation included an online questionnaire, one-on-one telephone interviews and facilitated discussion. Responses to the online questionnaire were tabulated for descriptive purposes, while transcripts from key informant interviews were analyzed using a directed content analysis approach. Results A total of 11 out of 13 stakeholders completed both the online questionnaire and interview process, while nine participated in the facilitated discussion. Eighty-nine percent of questionnaire items received overall ratings of agree or strongly agree; 11% of responses were rated as neutral with the exception of a single rating of disagreement with an item regarding the clarity of how stakeholder input was incorporated into project decisions. Recommendations for future improvement included developing standard recruitment practices, role descriptions and processes for improved communication with clinical and comparative effectiveness research investigators. Conclusions Evaluation of the stakeholder engagement process provided constructive feedback for future improvements and should be routinely conducted to ensure maximal effectiveness of stakeholder involvement. PMID:23459832

  2. Using Quality Improvement to Improve Internal and External Coordination and Referrals.

    PubMed

    Cain, Katherine L; Collins, Ragan P

    As part of accreditation, Public Health Accreditation Board site visitors recommended that the New Orleans Health Department strengthen its quality improvement program. With support from the Public Health Accreditation Board, the New Orleans Health Department subsequently embarked on a data-driven planning process through which it prioritized quality improvement projects for 2016. One of these projects aimed to improve referrals to New Orleans Health Department's direct services programs from local clinics and hospitals to better provide our most vulnerable residents with a continuum of care. After completing a cause-and-effect analysis, we implemented a solution involving increased outreach to health care institutions and saw annual participation increase in 3 out of 4 of our programs. We leveraged this work to successfully apply for funding to create a centralized referral system, which will facilitate partnerships among local health and human service agencies and improve access to services. This is one example of how accreditation has benefited our health department and our community. We have found that the accreditation process promotes a culture of quality and helps health departments identify and address areas for improvement.

  3. Research notes : multimodal transportation funding, the ConnectOregon program.

    DOT National Transportation Integrated Search

    2009-08-01

    The study examined the ConnectOregon I and II project selection processes, public outreach, and the review and approval processes. Throughout the programs phases, program participants and observers have offered ideas and suggestions for improving ...

  4. Biochemical Conversion: Using Enzymes, Microbes, and Catalysis to Make Fuels and Chemicals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-07-26

    This fact sheet describes the Bioenergy Technologies Office's biochemical conversion work and processes. BETO conducts collaborative research, development, and demonstration projects to improve several processing routes for the conversion of cellulosic biomass.

  5. Taiwan: improving radiography through application of Six Sigma techniques.

    PubMed

    Chen, Yan-Kwang; Lin, Jerry; Chang, Cheng-Chang

    2005-01-01

    The healthcare industry has shown significant recent growth potential in Taiwan. Associated financial problems have grown considerably since 1995, when national health insurance was implemented. Taiwan's healthcare bureau began to change the primary quantity-based healthcare expense payment method to a case-based payment model. Hospitals are now challenged to minimize healthcare waste. This article examines the application of manufacturing-based Six Sigma methods to an X-ray radiography improvement project to reduce the defect ratio of films for a teaching hospital in Taiwan. It was determined that (1) analysis of customer satisfaction data helped the Six Sigma improvement team identify critical quality elements; (2) the Six Sigma Level in this healthcare project is Lower than that in the manufacturing industry; (3) the improvement opportunity and the time required for the project had a direct correlation to the importance ascribed to the project and the cooperation received; and (4) process change can be made more quickly in the healthcare industry than in the manufacturing industry.

  6. Process simulation for advanced composites production

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allendorf, M.D.; Ferko, S.M.; Griffiths, S.

    1997-04-01

    The objective of this project is to improve the efficiency and lower the cost of chemical vapor deposition (CVD) processes used to manufacture advanced ceramics by providing the physical and chemical understanding necessary to optimize and control these processes. Project deliverables include: numerical process models; databases of thermodynamic and kinetic information related to the deposition process; and process sensors and software algorithms that can be used for process control. Target manufacturing techniques include CVD fiber coating technologies (used to deposit interfacial coatings on continuous fiber ceramic preforms), chemical vapor infiltration, thin-film deposition processes used in the glass industry, and coatingmore » techniques used to deposit wear-, abrasion-, and corrosion-resistant coatings for use in the pulp and paper, metals processing, and aluminum industries.« less

  7. Improving Process Heating System Performance v3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2016-04-11

    Improving Process Heating System Performance: A Sourcebook for Industry is a development of the U.S. Department of Energy (DOE) Advanced Manufacturing Office (AMO) and the Industrial Heating Equipment Association (IHEA). The AMO and IHEA undertook this project as part of an series of sourcebook publications developed by AMO on energy-consuming industrial systems, and opportunities to improve performance. Other topics in this series include compressed air systems, pumping systems, fan systems, steam systems, and motors and drives

  8. Data linkage capabilities in Australia: practical issues identified by a Population Health Research Network 'Proof of Concept project'.

    PubMed

    Mitchell, Rebecca J; Cameron, Cate M; McClure, Rod J; Williamson, Ann M

    2015-08-01

    To describe the practical issues that need to be overcome to conduct national data linkage projects in Australia and propose recommendations to improve efficiency. Review of the processes, documentation and applications required to conduct national data linkage in Australia. The establishment of state and national data linkage centres in Australia has placed Australia at the forefront of research linking health-related administrative data collections. However, improvements are needed to reduce the clerical burden on researchers, simplify the process of obtaining ethics approval, improve data accessibility, and thus improve the efficiency of data linkage research. While a sound state and national data linkage infrastructure is in place, the current complexity, duplication and lack of cohesion undermines any attempts to conduct research involving national record linkage in a timely manner. Data linkage applications and Human Research Ethics Committee approval processes need to be streamlined and duplication removed, in order to reduce the administrative and financial burden on researchers if national data linkage research is to be viable. © 2015 Public Health Association of Australia.

  9. Developing health visitor prescribing.

    PubMed

    Brooks, Christina

    2013-04-01

    Prescribing is an essential element of the health visitor's role. However, in one inner-city locality prescribing in practice was evaluated to be at a low level. A number of barriers to prescribing were identified through a focus group. A project to support health visitors was planned and delivered. The project involved clinical updates and improvement to the registration process, thereby reducing delays for practitioners in getting prescribing pads. The result was that prescribing confidence improved and prescribing activity increased.

  10. Critical challenges in ERP implementation: A qualitative case study in the Canadian oil and gas industry

    NASA Astrophysics Data System (ADS)

    Menon, Sreekumar A.

    This exploratory qualitative single-case study examines critical challenges encountered during ERP implementation based on individual perspectives in four project roles: senior leaders, project managers, project team members, and business users, all specifically in Canadian oil and gas industry. Data was collected by interviewing participants belonging to these categories, and by analyzing project documentation about ERP implementation. The organization for the case study was a leading multinational oil and gas company having a substantial presence in the energy sector in Canada. The study results were aligned with the six management questions regarding critical challenges in ERP: (a) circumstances to implement ERP, (b) benefits and process improvements achieved, (c) best practices implemented, (d) critical challenges encountered, (e) strategies and mitigating actions used, and (f) recommendations to improve future ERP implementations. The study results highlight six key findings. First, the study provided valid circumstances for implementing ERP systems. Second, the study underscored the importance of benefits and process improvements in ERP implementation. Third, the study highlighted that adoption of best practices is crucial for ERP Implementation. Fourth, the study found that critical challenges are encountered in ERP Implementation and are significant during ERP implementation. Fifth, the study found that strategies and mitigating actions can overcome challenges in ERP implementation. Finally, the study provided ten major recommendations on how to improve future ERP implementations.

  11. Bench-Scale Development of a Non-Aqueous Solvent (NAS) CO2 Capture Process for Coal-Fired Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lail, Marty

    The project aimed to advance RTI’s non-aqueous amine solvent technology by improving the solvent to reduce volatility, demonstrating long-term continuous operation at lab- (0.5 liters solvent) and bench-scale (~120 liters solvent), showing low reboiler heat duty measured during bench-scale testing, evaluating degradation products, building a rate-based process model, and evaluating the techno-economic performance of the process. The project team (RTI, SINTEF, Linde Engineering) and the technology performed well in each area of advancement. The modifications incorporated throughout the project enabled the attainment of target absorber and regenerator conditions for the process. Reboiler duties below 2,000 kJt/kg CO2 were observed inmore » a bench-scale test unit operated at RTI.« less

  12. The Tailoring of Traditional Systems Engineering for the Morpheus Project

    NASA Technical Reports Server (NTRS)

    Devolites, Jennifer L.; Hart, Jeremy J.

    2013-01-01

    NASA's Morpheus Project has developed and tested a prototype planetary lander capable of vertical takeoff and landing that is designed to serve as a testbed for advanced spacecraft technologies. The lander vehicle, propelled by a LOX/Methane engine and sized to carry a 500kg payload to the lunar surface, provides a platform for bringing technologies from the laboratory into an integrated flight system at relatively low cost. From the beginning, one of goals for the Morpheus Project was to streamline agency processes and practices. The Morpheus project accepted a challenge to tailor the traditional NASA systems engineering approach in a way that would be appropriate for a lower cost, rapid prototype engineering effort, but retain the essence of the guiding principles. The team has produced innovative ways to create an infrastructure and approach that would challenge existing systems engineering processes while still enabling successful implementation of the current Morpheus Project. This paper describes the tailored systems engineering approach for the Morpheus project, including the processes, tools, and amount of rigor employed over the project's multiple lifecycles since the project began in FY11. Lessons learned from these trials have the potential to be scaled up and improve efficiency on a larger projects or programs.

  13. Implementation of quality management in early stages of research and development projects at a university.

    PubMed

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects.

  14. Improving Undergraduate Research Experiences With An Intentional Mentoring Program: Lessons Learned Through Assessment of Keck Geology Consortium Programs

    NASA Astrophysics Data System (ADS)

    Wirth, K. R.; Garver, J. I.; Greer, L.; Pollock, M.; Varga, R. J.; Davidson, C. M.; Frey, H. M.; Hubbard, D. K.; Peck, W. H.; Wobus, R. A.

    2015-12-01

    The Keck Geology Consortium, with support from the National Science Foundation (REU Program) and ExxonMobil, is a collaborative effort by 18 colleges to improve geoscience education through high-quality research experiences. Since its inception in 1987 more than 1350 undergraduate students and 145 faculty have been involved in 189 yearlong research projects. This non-traditional REU model offers exceptional opportunities for students to address research questions at a deep level, to learn and utilize sophisticated analytical methods, and to engage in authentic collaborative research that culminates in an undergraduate research symposium and published abstracts volume. The large numbers of student and faculty participants in Keck projects also affords a unique opportunity to study the impacts of program design on undergraduate research experiences in the geosciences. Students who participate in Keck projects generally report significant gains in personal and professional dimensions, as well as in clarification of educational and career goals. Survey data from student participants, project directors, and campus advisors identify mentoring as one of the most critical and challenging elements of successful undergraduate research experiences. Additional challenges arise from the distributed nature of Keck projects (i.e., participants, project directors, advisors, and other collaborators are at different institutions) and across the span of yearlong projects. In an endeavor to improve student learning about the nature and process of science, and to make mentoring practices more intentional, the Consortium has developed workshops and materials to support both project directors and campus research advisors (e.g., best practices for mentoring, teaching ethical professional conduct, benchmarks for progress, activities to support students during research process). The Consortium continues to evolve its practices to better support students from underrepresented groups.

  15. Pediatric Resident Academic Projects While on Global Health Electives: Ten Years of Experience at the University of Minnesota.

    PubMed

    Pitt, Michael B; Slusher, Tina M; Howard, Cynthia R; Cole, Valerie B; Gladding, Sophia P

    2017-07-01

    Many residency programs require residents to complete an academic project as part of a global health (GH) elective. However, there has been little description of the range of projects residents have pursued during GH electives or the extent to which these projects are consistent with proposed best practices. The authors conducted a document review of 67 written summaries or copies of presentations of academic projects (hereafter, summaries) completed by pediatric and medicine-pediatric residents at the University of Minnesota while on GH electives from 2005 to 2015. Two authors independently coded each summary for the type of project completed; when the project idea was generated; explicit mention of a mentor from the home institution, host institution, or both; whether a needs assessment was conducted; and whether there were plans for sustainability. Most of the 67 projects were categorized into one of three project types: quality/process improvement (28 [42%]), education (18 [27%]), or clinical research (14 [21%]). Most summaries explicitly mentioned a mentor (45 [67%]), reported conducting a needs assessment (38 [57%]), and indicated sustainability plans (45 [67%]). Of the 42 summaries that indicated the timing of idea generation, 30 (71%) indicated the idea was developed after arriving at the host site. Residents undertook a wide range of academic projects during GH electives, most commonly quality/process improvement and education projects. The projects were largely aligned with best practices, with most summaries indicating the resident worked with a mentor, conducted a needs assessment, and made plans for sustainability.

  16. Improved Geothermometry Through Multivariate Reaction-path Modeling and Evaluation of Geomicrobiological Influences on Geochemical Temperature Indicators: Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mattson, Earl; Smith, Robert; Fujita, Yoshiko

    2015-03-01

    The project was aimed at demonstrating that the geothermometric predictions can be improved through the application of multi-element reaction path modeling that accounts for lithologic and tectonic settings, while also accounting for biological influences on geochemical temperature indicators. The limited utilization of chemical signatures by individual traditional geothermometer in the development of reservoir temperature estimates may have been constraining their reliability for evaluation of potential geothermal resources. This project, however, was intended to build a geothermometry tool which can integrate multi-component reaction path modeling with process-optimization capability that can be applied to dilute, low-temperature water samples to consistently predict reservoirmore » temperature within ±30 °C. The project was also intended to evaluate the extent to which microbiological processes can modulate the geochemical signals in some thermal waters and influence the geothermometric predictions.« less

  17. Supporting the Future Air Traffic Control Projection Process

    NASA Technical Reports Server (NTRS)

    Davison, Hayley J.; Hansman, R. John, Jr.

    2002-01-01

    In air traffic control, projecting what the air traffic situation will be over the next 30 seconds to 30 minutes is a key process in identifying conflicts that may arise so that evasive action can be taken upon discovery of these conflicts. A series of field visits in the Boston and New York terminal radar approach control (TRACON) facilities and in the oceanic air traffic control facilities in New York and Reykjavik, Iceland were conducted to investigate the projection process in two different ATC domains. The results from the site visits suggest that two types of projection are currently used in ATC tasks, depending on the type of separation minima and/or traffic restriction and information display used by the controller. As technologies improve and procedures change, care should be taken by designers to support projection through displays, automation, and procedures. It is critical to prevent time/space mismatches between interfaces and restrictions. Existing structure in traffic dynamics could be utilized to provide controllers with useful behavioral models on which to build projections. Subtle structure that the controllers are unable to internalize could be incorporated into an ATC projection aid.

  18. Using quality improvement methods to optimize resources and maximize productivity in an anesthesia screening and consultation clinic.

    PubMed

    Varughese, Anna M; Hagerman, Nancy; Townsend, Mari E

    2013-07-01

    The anesthesia preoperative screening and evaluation of a patient prior to surgery is a critical element in the safe and effective delivery of anesthesia care. In this era of increased focus on cost containment, many anesthesia practices are looking for ways to maximize productivity while maintaining the quality of the preoperative evaluation process by harnessing and optimizing all available resources. We sought to develop a Nurse Practitioner-assisted Preoperative Anesthesia Screening process using quality improvement methods with the goal of maintaining the quality of the screening process, while at the same time redirecting anesthesiologists time for the provision of nonoperating room (OR) anesthesia. The Nurse practitioner (NP) time (approximately 10 h per week) directed to this project was gained as a result of an earlier resource utilization improvement project within the Department of Anesthesia. The goal of this improvement project was to increase the proportion of patient anesthesia screens conducted by NPs to 50% within 6 months. After discussion with key stakeholders of the process, a multidisciplinary improvement team identified a set of operational factors (key drivers) believed to be important to the success of the preoperative anesthesia screening process. These included the development of dedicated NP time for daily screening, NP competency and confidence with the screening process, effective mentoring by anesthesiologists, standardization of screening process, and communication with stakeholders of the process, that is, surgeons. These key drivers focused on the development of several interventions such as (i) NP education in the preoperative anesthesia screening for consultation process by a series of didactic lectures conducted by anesthesiologists, and NP's shadowing an anesthesiologist during the screening process, (ii) Anesthesiologist mentoring and assessment of NP screenings using the dual screening process whereby both anesthesiologists and NP conducted the screening process independently and results were compared and discussed, (iii) Examination and re-adjustment of NP schedules to provide time for daily screening while preserving other responsibilities, and (iv) Standardization through the development of guidelines for the preoperative screening process. Measures recorded included the percentage of patient anesthesia screens conducted by NP, the percentage of dual screens with MD and NP agreement regarding the screening decision, and the average times taken for the anesthesiologist and NP screening process. After implementation of these interventions, the percentage of successful NP-assisted anesthesia consultation screenings increased from 0% to 65% over a period of 6 months. The Anesthesiologists' time redirected to non-OR anesthesia averaged at least 8 h a week. The percentage of dual screens with agreement on the screening decision was 96% (goal >95%). The overall average time taken for a NP screen was 8.2 min vs 4.5 min for an anesthesiologist screen. The overall average operating room delays and cancelations for cases on the day of surgery remained the same. By applying quality improvement methods, we identified key drivers for the institution of an NP-assisted preoperative screening process and successfully implemented this process while redirecting anesthesiologists' time for the provision of non-OR anesthesia. This project was instrumental in improving the matching of provider skills with clinical need while maintaining superior outcomes at the lowest possible cost. © 2013 John Wiley & Sons Ltd.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cort, K. A.; Hostick, D. J.; Belzer, D. B.

    This report compiles information and conclusions gathered as part of the “Modeling EERE Deployment Programs” project. The purpose of the project was to identify and characterize the modeling of deployment programs within the EERE Technology Development (TD) programs, address possible improvements to the modeling process, and note gaps in knowledge in which future research is needed.

  20. The uncertainty of crop yield projections is reduced by improved temperature response functions

    USDA-ARS?s Scientific Manuscript database

    Increasing the accuracy of crop productivity estimates is a key Increasing the accuracy of crop productivity estimates is a key element in planning adaptation strategies to ensure global food security under climate change. Process-based crop models are effective means to project climate impact on cr...

  1. Final Report on Improvements to the External Corrosion Direct Assessment (ECDA) Process (WP # 360) Potential Measurements on Paved Areas (Project #243)

    DOT National Transportation Integrated Search

    2010-06-01

    On June 28, 2007, PHMSA released a Broad Agency Announcement (BAA), DTPH56- 07-BAA-000002, seeking white papers on individual projects and consolidated Research and Development (R&D) programs addressing topics on their pipeline safety program. Althou...

  2. Transfer: Making It Work. A Community College Report.

    ERIC Educational Resources Information Center

    Donovan, Richard A., Ed.; And Others

    In 1983, the Ford Foundation funded a two-part project, the Urban Community College Transfer Opportunities Project (UCC/TOP), designed to improve the transfer process from the community college to the four-year institution for urban minority students. Through partnership efforts with secondary schools and four-year colleges and universities, the…

  3. School-to-Work Project. Final Report.

    ERIC Educational Resources Information Center

    National Advisory Council on Vocational Education, Washington, DC.

    The document reviews the School-to-Work Project, which has been concerned with improving and developing the school component of the job placement process. Research, design, development, and dissemination phases and results are traced from 1972-1976 through the following stages: (1) Research, 1972-74, involving a literature search to identify…

  4. The human side of lean teams.

    PubMed

    Wackerbarth, Sarah B; Strawser-Srinath, Jamie R; Conigliaro, Joseph C

    2015-05-01

    Organizations use lean principles to increase quality and decrease costs. Lean projects require an understanding of systems-wide processes and utilize interdisciplinary teams. Most lean tools are straightforward, and the biggest barrier to successful implementation is often development of the team aspect of the lean approach. The purpose of this article is to share challenges experienced by a lean team charged with improving a hospital discharge process. Reflection on the experience provides an opportunity to highlight lessons from The Team Handbook by Peter Scholtes and colleagues. To improve the likelihood that process improvement initiatives, including lean projects, will be successful, organizations should consider providing training in organizational change principles and team building. The authors' lean team learned these lessons the hard way. Despite the challenges, the team successfully implemented changes throughout the organization that have had a positive impact. Training to understand the psychology of change might have decreased the resistance faced in implementing these changes. © 2014 by the American College of Medical Quality.

  5. Integrated Risk Management Within NASA Programs/Projects

    NASA Technical Reports Server (NTRS)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the chances for mission success.

  6. Biochemical Platform Processing Integration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The objective of this project is to facilitate deployment of enzyme-based biomass conversion technology. The immediate goal is to explore integration issues that impact process performance and to demonstrate improved performance of the lower-cost enzymes being developed by Genencor and Novozymes.

  7. Support Process Development for Assessing Green Infrastructure in Omaha, NE

    EPA Pesticide Factsheets

    Evaluates Omaha’s current process for assessing green infrastructure projects and recommends improvements for comparing green and gray infrastructure. Compares Omaha’s design criteria to other cities. Reviews other US programs with rights-of-way criteria.

  8. The performance evaluation model of mining project founded on the weight optimization entropy value method

    NASA Astrophysics Data System (ADS)

    Mao, Chao; Chen, Shou

    2017-01-01

    According to the traditional entropy value method still have low evaluation accuracy when evaluating the performance of mining projects, a performance evaluation model of mineral project founded on improved entropy is proposed. First establish a new weight assignment model founded on compatible matrix analysis of analytic hierarchy process (AHP) and entropy value method, when the compatibility matrix analysis to achieve consistency requirements, if it has differences between subjective weights and objective weights, moderately adjust both proportions, then on this basis, the fuzzy evaluation matrix for performance evaluation. The simulation experiments show that, compared with traditional entropy and compatible matrix analysis method, the proposed performance evaluation model of mining project based on improved entropy value method has higher accuracy assessment.

  9. A single activity with a practice quality improvement project for faculty and a quality improvement project for residents.

    PubMed

    Kim, Hyun; Malatesta, Theresa M; Simone, Nicole L; Den, Robert B; McAna, John; Dicker, Adam P; Bar Ad, Voichita

    2016-01-01

    The Next Accreditation System (NAS) requires radiation oncology residents to do a formal quality improvement project during their residency. The American Board of Radiology (ABR) Maintenance of Certification (MOC) program requires certified physicians to complete a Practice Quality Improvement (PQI) project approximately every 3 years. The purpose of our project was to develop a clinical transition of care policy via a process that resulted in quality improvement project credit for residents and PQI credit for participating faculty. Approval for project implementation was obtained from the ABR MOC committee. The PQI project consisted of an initial survey to assess resident perception on resident transition of care in our department, formal sign-out training, and 2 postintervention surveys after 1 and 11 months. The primary endpoint was the percentage of questions with ≤1 unfavorable responses. Sign-test was used to determine response difference from neutral. One hundred percent of surveyed residents completed the preintervention (n = 6), postintervention 1 (n = 7), and postintervention 2 (n = 8) surveys. In the preintervention, postintervention 1, and postintervention 2 surveys, 71.4%, 57.1%, and 57.1% of questions were answered with ≤1 unfavorable response, respectively. The number of questions with ≥75% favorable response was 7 (50%), 7 (50%), and 11 (78.5%) in the preintervention, postintervention 1, and postintervention 2 surveys, respectively (P = .13). A written sign-out template and monthly protected sign-out meetings were instituted. One resident and 3 attending physicians received credit for Accreditation Council of Graduate Medical Education NAS quality improvement and ABR MOC PQI projects, respectively. This project shows the feasibility of a combined attending and resident physician effort to improve patient care and fulfill his or her respective ABR MOC PQI and Accreditation Council of Graduate Medical Education NAS requirements. Attending and resident physicians can tailor collaborative projects to fulfill MOC and NAS requirements unique to their subspecialty. Written sign-out templates and protected sign-out time may improve transition of care. Copyright © 2016 American Society for Radiation Oncology. Published by Elsevier Inc. All rights reserved.

  10. Process Improvement Should Link to Security: SEPG 2007 Security Track Recap

    DTIC Science & Technology

    2007-09-01

    the Systems Security Engineering Capability Maturity Model (SSE- CMM / ISO 21827) and its use in system software developments ...software development life cycle ( SDLC )? 6. In what ways should process improvement support security in the SDLC ? 1.2 10BPANEL RESOURCES For each... project management, and support practices through the use of the capability maturity models including the CMMI and the Systems Security

  11. Evaluation of the implementation of an intervention to improve the street environment and promote walking for transport in deprived neighbourhoods.

    PubMed

    Adams, Emma J; Cavill, Nick; Sherar, Lauren B

    2017-08-14

    Levels of physical activity remain low, particularly in deprived areas. Improving the street environment to promote walking for transport using a community engagement approach is a potential strategy to increase physical activity. An understanding of the implementation of this intervention approach is needed to facilitate further research, replication and scale-up. The aim of this study was to evaluate the implementation of the Fitter for Walking (FFW) intervention in deprived neighbourhoods. FFW was delivered in five regions of England between August 2008 and March 2012 and aimed to use a community engagement approach to improve the street environment to promote walking for transport. Implementation was assessed in relation to reach; dosage; implementation processes and adaptation; and factors influencing implementation. Three data sources were used: focus groups and face-to-face interviews with coordinators; implementation logs; and participation records. Reach: 155 community groups participated in FFW engaging 30,230 local residents. Dosage: A wide variety of environmental improvements were implemented by local authorities (LAs) (42 projects) and by communities (46 projects). Examples of LA-led improvements included removal of encroaching vegetation, new/improved pedestrian signage, new dropped kerbs/kerb improvements and new, repaired or improved footpaths. Examples of community-led improvements included planting bulbs, shrubs or bedding plants, clean-up days and litter pick-ups. In 32 projects, no environmental improvements were implemented. Promotional and awareness-raising activities were undertaken in 81 projects. Examples included led walks, themed walks, development of maps/resources to promote improved routes and community events. Processes and adaptation: The need for a planning phase, a preparatory phase, and a delivery phase with a four step process were identified. Adaptability to local context was important. Factors influencing implementation: Five key themes were identified in relation to the barriers and facilitators of implementing FFW: local knowledge and contacts; intervention delivery; coordinator role; working with LAs and other partners; and working with communities. FFW is one of few reported interventions which have used a community engagement approach to change the street environment to promote walking for transport in deprived neighbourhoods. Delivering these types of interventions is complex and requires considerable resource and time. A set of recommendations and an implementation framework are proposed for future delivery of this and similar types of programme.

  12. Evaluation of an institutional project to improve venous thromboembolism prevention.

    PubMed

    Minami, Christina A; Yang, Anthony D; Ju, Mila; Culver, Eckford; Seifert, Kathryn; Kreutzer, Lindsey; Halverson, Terri; O'Leary, Kevin J; Bilimoria, Karl Y

    2016-12-01

    Northwestern Memorial Hospital (NMH) was historically a poor performer on the venous thromboembolism (VTE) outcome measure. As this measure has been shown to be flawed by surveillance bias, NMH embraced process-of-care measures to ensure appropriate VTE prophylaxis to assess healthcare-associated VTE prevention efforts. To evaluate the impact of an institution-wide project aimed at improving hospital performance on VTE prophylaxis measures. A retrospective observational study. NMH, an 885-bed academic medical center in Chicago, Illinois PATIENTS: Inpatients admitted to NMH from January 1, 2013 to May 1, 2013 and from October 1, 2014 to April 1, 2015 were eligible for evaluation. Using the define-measure-analyze-improve-control (DMAIC) process-improvement methodology, a multidisciplinary team implemented and iteratively improved 15 data-driven interventions in 4 broad areas: (1) electronic medical record (EMR) alerts, (2) education initiatives, (3) new EMR order sets, and (4) other EMR changes. The Joint Commission's 6 core measures and the Surgical Care Improvement Project (SCIP) SCIP-VTE-2 measure. Based on 3103 observations (1679 from January 1, 2013 to May 1, 2013, and 1424 from October 1, 2014 to April 1, 2015), performance on the core measures improved. Performance on measure 1 (chemoprophylaxis) improved from 82.5% to 90.2% on medicine services, and from 94.4% to 97.6% on surgical services. The largest improvements were seen in measure 4 (platelet monitoring), with a performance increase from 76.7% adherence to 100%, and measure 5 (warfarin discharge instructions), with a performance increase from 27.4% to 88.8%. A systematic hospital-wide DMAIC project improved VTE prophylaxis measure performance. Sustained performance has been observed, and novel control mechanisms for continued performance surveillance have been embedded in the hospital system. Journal of Hospital Medicine 2016;11:S29-S37. © 2016 Society of Hospital Medicine. © 2016 Society of Hospital Medicine.

  13. Collaborating with consumer and community representatives in health and medical research in Australia: results from an evaluation.

    PubMed

    Payne, Janet M; D'Antoine, Heather A; France, Kathryn E; McKenzie, Anne E; Henley, Nadine; Bartu, Anne E; Elliott, Elizabeth J; Bower, Carol

    2011-05-14

    To collaborate with consumer and community representatives in the Alcohol and Pregnancy Project from 2006-2008 http://www.ichr.uwa.edu.au/alcoholandpregnancy and evaluate researchers' and consumer and community representatives' perceptions of the process, context and impact of consumer and community participation in the project. We formed two reference groups and sought consumer and community representatives' perspectives on all aspects of the project over a three year period. We developed an evaluation framework and asked consumer and community representatives and researchers to complete a self-administered questionnaire at the end of the project. Fifteen researchers (93.8%) and seven (53.8%) consumer and community representatives completed a questionnaire. Most consumer and community representatives agreed that the process and context measures of their participation had been achieved. Both researchers and consumer and community representatives identified areas for improvement and offered suggestions how these could be improved for future research. Researchers thought consumer and community participation contributed to project outputs and outcomes by enhancing scientific and ethical standards, providing legitimacy and authority, and increasing the project's credibility and participation. They saw it was fundamental to the research process and acknowledged consumer and community representatives for their excellent contribution. Consumer and community representatives were able to directly influence decisions about the research. They thought that consumer and community participation had significant influence on the success of project outputs and outcomes. Consumer and community participation is an essential component of good research practice and contributed to the Alcohol and Pregnancy Project by enhancing research processes, outputs and outcomes, and this participation was valued by community and consumer representatives and researchers. The National Health and Medical Research Council in Australia expects researchers to work in partnership and involve consumer and community representatives in health and medical research, and to evaluate community and consumer participation. It is important to demonstrate whether consumer and community participation makes a difference to health and medical research.

  14. Collaborating with consumer and community representatives in health and medical research in Australia: results from an evaluation

    PubMed Central

    2011-01-01

    Objective To collaborate with consumer and community representatives in the Alcohol and Pregnancy Project from 2006-2008 http://www.ichr.uwa.edu.au/alcoholandpregnancy and evaluate researchers' and consumer and community representatives' perceptions of the process, context and impact of consumer and community participation in the project. Methods We formed two reference groups and sought consumer and community representatives' perspectives on all aspects of the project over a three year period. We developed an evaluation framework and asked consumer and community representatives and researchers to complete a self-administered questionnaire at the end of the project. Results Fifteen researchers (93.8%) and seven (53.8%) consumer and community representatives completed a questionnaire. Most consumer and community representatives agreed that the process and context measures of their participation had been achieved. Both researchers and consumer and community representatives identified areas for improvement and offered suggestions how these could be improved for future research. Researchers thought consumer and community participation contributed to project outputs and outcomes by enhancing scientific and ethical standards, providing legitimacy and authority, and increasing the project's credibility and participation. They saw it was fundamental to the research process and acknowledged consumer and community representatives for their excellent contribution. Consumer and community representatives were able to directly influence decisions about the research. They thought that consumer and community participation had significant influence on the success of project outputs and outcomes. Conclusions Consumer and community participation is an essential component of good research practice and contributed to the Alcohol and Pregnancy Project by enhancing research processes, outputs and outcomes, and this participation was valued by community and consumer representatives and researchers. The National Health and Medical Research Council in Australia expects researchers to work in partnership and involve consumer and community representatives in health and medical research, and to evaluate community and consumer participation. It is important to demonstrate whether consumer and community participation makes a difference to health and medical research. PMID:21569591

  15. Advances in Projection Moire Interferometry Development for Large Wind Tunnel Applications

    NASA Technical Reports Server (NTRS)

    Fleming, Gary A.; Soto, Hector L.; South, Bruce W.; Bartram, Scott M.

    1999-01-01

    An instrument development program aimed at using Projection Moire Interferometry (PMI) for acquiring model deformation measurements in large wind tunnels was begun at NASA Langley Research Center in 1996. Various improvements to the initial prototype PMI systems have been made throughout this development effort. This paper documents several of the most significant improvements to the optical hardware and image processing software, and addresses system implementation issues for large wind tunnel applications. The improvements have increased both measurement accuracy and instrument efficiency, promoting the routine use of PMI for model deformation measurements in production wind tunnel tests.

  16. Implementation of lean thinking: one health system's journey.

    PubMed

    Kim, Christopher S; Spahlinger, David A; Kin, Jeanne M; Coffey, Richard J; Billi, John E

    2009-08-01

    Lean Thinking is a management philosophy derived from the manufacturing industry, where Toyota has long been the gold standard. Health care organizations have started to apply this approach to patient care. After initial experimentation, the University of Michigan Health System (UMHS) has adopted Lean Thinking as its uniform approach to quality improvement and is striving to become a complete Lean organization. In 2005, the senior leadership selected an initial set of projects in areas that traced the patient's journey across different care settings within our health system. Four of the projects were as follows: orthopedic surgery clinic scheduling, radiation oncology therapy, peripherally inserted central catheter (PICC) services, and coordination of care to the outpatient setting. Lean Thinking encourages service providers to focus on value as defined by the customer and the relentless elimination of waste that impedes the flow of value. A series of learning projects were conducted to test whether Lean methods would work at UMHS. The following factors were found to be key to LEAN PROJECT SUCCESS: expert guidance for initial efforts, leadership in the form of clinical champions and senior management support of the improvement work, frontline worker engagement in mapping out "current state" processes, identifying waste and designing an improved "future state," using metrics to develop and track interventions, and defining realistic project scope. As UMHS's experience applying Lean Thinking to our patient care processes has grown, so have support, enthusiasm, and expertise within the organization. UMHS's Lean Thinking system, now known as the Michigan Quality System, has emerged as the core improvement strategy.

  17. Using adapted quality-improvement approaches to strengthen community-based health systems and improve care in high HIV-burden sub-Saharan African countries.

    PubMed

    Horwood, Christiane M; Youngleson, Michele S; Moses, Edward; Stern, Amy F; Barker, Pierre M

    2015-07-01

    Achieving long-term retention in HIV care is an important challenge for HIV management and achieving elimination of mother-to-child transmission. Sustainable, affordable strategies are required to achieve this, including strengthening of community-based interventions. Deployment of community-based health workers (CHWs) can improve health outcomes but there is a need to identify systems to support and maintain high-quality performance. Quality-improvement strategies have been successfully implemented to improve quality and coverage of healthcare in facilities and could provide a framework to support community-based interventions. Four community-based quality-improvement projects from South Africa, Malawi and Mozambique are described. Community-based improvement teams linked to the facility-based health system participated in learning networks (modified Breakthrough Series), and used quality-improvement methods to improve process performance. Teams were guided by trained quality mentors who used local data to help nurses and CHWs identify gaps in service provision and test solutions. Learning network participants gathered at intervals to share progress and identify successful strategies for improvement. CHWs demonstrated understanding of quality-improvement concepts, tools and methods, and implemented quality-improvement projects successfully. Challenges of using quality-improvement approaches in community settings included adapting processes, particularly data reporting, to the education level and first language of community members. Quality-improvement techniques can be implemented by CHWs to improve outcomes in community settings but these approaches require adaptation and additional mentoring support to be successful. More research is required to establish the effectiveness of this approach on processes and outcomes of care.

  18. Continuous Codes and Standards Improvement (CCSI)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rivkin, Carl H; Burgess, Robert M; Buttner, William J

    2015-10-21

    As of 2014, the majority of the codes and standards required to initially deploy hydrogen technologies infrastructure in the United States have been promulgated. These codes and standards will be field tested through their application to actual hydrogen technologies projects. Continuous codes and standards improvement (CCSI) is a process of identifying code issues that arise during project deployment and then developing codes solutions to these issues. These solutions would typically be proposed amendments to codes and standards. The process is continuous because as technology and the state of safety knowledge develops there will be a need to monitor the applicationmore » of codes and standards and improve them based on information gathered during their application. This paper will discuss code issues that have surfaced through hydrogen technologies infrastructure project deployment and potential code changes that would address these issues. The issues that this paper will address include (1) setback distances for bulk hydrogen storage, (2) code mandated hazard analyses, (3) sensor placement and communication, (4) the use of approved equipment, and (5) system monitoring and maintenance requirements.« less

  19. Reengineering the Acquisition/Procurement Process: A Methodology for Requirements Collection

    NASA Technical Reports Server (NTRS)

    Taylor, Randall; Vanek, Thomas

    2011-01-01

    This paper captures the systematic approach taken by JPL's Acquisition Reengineering Project team, the methodology used, challenges faced, and lessons learned. It provides pragmatic "how-to" techniques and tools for collecting requirements and for identifying areas of improvement in an acquisition/procurement process or other core process of interest.

  20. Wind and Solar Data Projections from the U.S. Energy Information Administration: Past Performance and Planned Enhancements

    EIA Publications

    2016-01-01

    In an effort to improve EIA's approach to providing accurate, comprehensive data, and useful projections for policy analysis, EIA has conducted a review of its historical data and projections of capacity, generation, and cost projections for wind and solar technologies. While EIA's internal processes and engagement with stakeholders are both continuing, this paper shares some early findings of EIA's current review of our wind and solar data and projections, focusing in part on some of the issues that have been publicly raised by EIA's critics.

  1. Manpower and project planning

    NASA Technical Reports Server (NTRS)

    Johnson, David W.

    1991-01-01

    The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.

  2. A quality improvement project to reduce the intraoperative use of single-dose fentanyl vials across multiple patients in a pediatric institution.

    PubMed

    Buck, David; Subramanyam, Rajeev; Varughese, Anna

    2016-01-01

    The use of a single-dose vial across multiple patients presents a risk to sterility and is against CDC guidelines. We initiated a quality improvement (QI) project to reduce the intraoperative use of single-dose vials of fentanyl across multiple patients at Cincinnati Children's Hospital Medical Center (CCHMC). The initial step of the improvement project was the development of a Key Driver Diagram. The diagram has the SMART aim of the project, key drivers inherent to the process we are trying to improve, and specific interventions targeting the key drivers. The number of patients each week receiving an IV dose of fentanyl, from a vial previously accessed for another patient was tracked in a high turnover operating room (OR). The improvement model used was based on the concept of building Plan-Do-Study-Act (PDSA) cycles. Tests of change included provider education, provision of an increased number of fentanyl vials, alternate wasting processes, and provision of single-use fentanyl syringes by the pharmacy. Prior to initiation of this project, it was common for a single fentanyl vial to be accessed for multiple patients. Our data showed an average percentage of failures of just over 50%. During the end of the project, after 7 months, the mean percentage failures had dropped to 5%. Preparation of 20 mcg single-use fentanyl syringes by pharmacy, combined with education of providers on appropriate use, was successful in reducing failures to below our goal of 25%. Appropriately sized fentanyl syringes prepared by pharmacy, education on correct use of single-dose vials, and reminders in the OR, reduced the percentage of patients receiving a dose of fentanyl from a vial previously accessed for another patient in a high-volume otolaryngology room. © 2015 John Wiley & Sons Ltd.

  3. Strengthening the management of ESA - the Inter-Directorate Reform of Corporate and Risk Management

    NASA Astrophysics Data System (ADS)

    Feustel-Büechl, Jörg; Arend, Harald; Derio, Eric; Infante, Giovanni; Kreiner, Gerhard; Phaler, Jesse; Tabbert, Michael

    2007-02-01

    ESA has undertaken the Inter-Directorate Reform of Corporate and Risk Management to strengthen the Agency's internal operations. The reform was completed at the end of 2006, encompassing five dedicated projects on Risk Management, Agency-Wide Controlling System, Project Plan and Integrated Project Review, General Budget Structure and Charging Policy, and Corporate Information Systems. It has contributed to improved management of the Agency's internal operations by engaging all internal stakeholders in a common objective, introducing improvements to planning and management methods, elaborating consolidated information structures and tools, contributing to enhanced transparency and accountability, and by providing qualified new policies, processes and tools.

  4. Probabilistic Weather Information Tailored to the Needs of Transmission System Operators

    NASA Astrophysics Data System (ADS)

    Alberts, I.; Stauch, V.; Lee, D.; Hagedorn, R.

    2014-12-01

    Reliable and accurate forecasts for wind and photovoltaic (PV) power production are essential for stable transmission systems. A high potential for improving the wind and PV power forecasts lies in optimizing the weather forecasts, since these energy sources are highly weather dependent. For this reason the main objective of the German research project EWeLiNE is to improve the quality the underlying numerical weather predictions towards energy operations. In this project, the German Meteorological Service (DWD), the Fraunhofer Institute for Wind Energy and Energy System Technology, and three of the German transmission system operators (TSOs) are working together to improve the weather and power forecasts. Probabilistic predictions are of particular interest, as the quantification of uncertainties provides an important tool for risk management. Theoretical considerations suggest that it can be advantageous to use probabilistic information to represent and respond to the remaining uncertainties in the forecasts. However, it remains a challenge to integrate this information into the decision making processes related to market participation and power systems operations. The project is planned and carried out in close cooperation with the involved TSOs in order to ensure the usability of the products developed. It will conclude with a demonstration phase, in which the improved models and newly developed products are combined into a process chain and used to provide information to TSOs in a real-time decision support tool. The use of a web-based development platform enables short development cycles and agile adaptation to evolving user needs. This contribution will present the EWeLiNE project and discuss ideas on how to incorporate probabilistic information into the users' current decision making processes.

  5. Improving the Quality of Services in Residential Treatment Facilities: A Strength-Based Consultative Review Process

    ERIC Educational Resources Information Center

    Pavkov, Thomas W.; Lourie, Ira S.; Hug, Richard W.; Negash, Sesen

    2010-01-01

    This descriptive case study reports on the positive impact of a consultative review methodology used to conduct quality assurance reviews as part of the Residential Treatment Center Evaluation Project. The study details improvement in the quality of services provided to youth in unmonitored residential treatment facilities. Improvements were…

  6. Linking School Effectiveness and School Improvement: The Background and Outline of the Project

    ERIC Educational Resources Information Center

    Creemers, Bert P. M.; Reezigt, Gerry J.

    2005-01-01

    School effectiveness and school improvement have different origins: School effectiveness is more directed to finding out "what works" in education and "why"; school improvement is practice and policy oriented and intended to change education in the desired direction. However, in their orientation to outcomes, input, processes,…

  7. Asset Management Process (AMP) Improvement Project: Final Report of Findings and Recommendations

    DTIC Science & Technology

    2009-10-01

    cannibalized components could no longer be sighted due to their re-use in other systems or equipment. Solution — A Rapid Improvement Event, or Kaizen , was...Property Loss Reporting domain’s lifecycle, the Green Belt recognized the opportunity for a Rapid Improvement Event (RIE), or Kaizen . A five-day RIE was

  8. Creating quality improvement culture in public health agencies.

    PubMed

    Davis, Mary V; Mahanna, Elizabeth; Joly, Brenda; Zelek, Michael; Riley, William; Verma, Pooja; Fisher, Jessica Solomon

    2014-01-01

    We conducted case studies of 10 agencies that participated in early quality improvement efforts. The agencies participated in a project conducted by the National Association of County and City Health Officials (2007-2008). Case study participants included health directors and quality improvement team leaders and members. We implemented multiple qualitative analysis processes, including cross-case analysis and logic modeling. We categorized agencies according to the extent to which they had developed a quality improvement culture. Agencies were conducting informal quality improvement projects (n = 4), conducting formal quality improvement projects (n = 3), or creating a quality improvement culture (n = 4). Agencies conducting formal quality improvement and creating a quality improvement culture had leadership support for quality improvement, participated in national quality improvement initiatives, had a greater number of staff trained in quality improvement and quality improvement teams that met regularly with decision-making authority. Agencies conducting informal quality improvement were likely to report that accreditation is the major driver for quality improvement work. Agencies creating a quality improvement culture were more likely to have a history of evidence-based decision-making and use quality improvement to address emerging issues. Our findings support previous research and add the roles of national public health accreditation and emerging issues as factors in agencies' ability to create and sustain a quality improvement culture.

  9. Integrating information from disparate sources: the Walter Reed National Surgical Quality Improvement Program Data Transfer Project.

    PubMed

    Nelson, Victoria; Nelson, Victoria Ruth; Li, Fiona; Green, Susan; Tamura, Tomoyoshi; Liu, Jun-Min; Class, Margaret

    2008-11-06

    The Walter Reed National Surgical Quality Improvement Program Data Transfer web module integrates with medical and surgical information systems, and leverages outside standards, such as the National Library of Medicine's RxNorm, to process surgical and risk assessment data. Key components of the project included a needs assessment with nurse reviewers and a data analysis for federated (standards were locally controlled) data sources. The resulting interface streamlines nurse reviewer workflow by integrating related tasks and data.

  10. Climbing the ladder: capability maturity model integration level 3

    NASA Astrophysics Data System (ADS)

    Day, Bryce; Lutteroth, Christof

    2011-02-01

    This article details the attempt to form a complete workflow model for an information and communication technologies (ICT) company in order to achieve a capability maturity model integration (CMMI) maturity rating of 3. During this project, business processes across the company's core and auxiliary sectors were documented and extended using modern enterprise modelling tools and a The Open Group Architectural Framework (TOGAF) methodology. Different challenges were encountered with regard to process customisation and tool support for enterprise modelling. In particular, there were problems with the reuse of process models, the integration of different project management methodologies and the integration of the Rational Unified Process development process framework that had to be solved. We report on these challenges and the perceived effects of the project on the company. Finally, we point out research directions that could help to improve the situation in the future.

  11. Identifying strengths and weaknesses of Quality Management Unit University of Sumatera Utara software using SCAMPI C

    NASA Astrophysics Data System (ADS)

    Gunawan, D.; Amalia, A.; Rahmat, R. F.; Muchtar, M. A.; Siregar, I.

    2018-02-01

    Identification of software maturity level is a technique to determine the quality of the software. By identifying the software maturity level, the weaknesses of the software can be observed. As a result, the recommendations might be a reference for future software maintenance and development. This paper discusses the software Capability Level (CL) with case studies on Quality Management Unit (Unit Manajemen Mutu) University of Sumatera Utara (UMM-USU). This research utilized Standard CMMI Appraisal Method for Process Improvement class C (SCAMPI C) model with continuous representation. This model focuses on activities for developing quality products and services. The observation is done in three process areas, such as Project Planning (PP), Project Monitoring and Control (PMC), and Requirements Management (REQM). According to the measurement of software capability level for UMM-USU software, turns out that the capability level for the observed process area is in the range of CL1 and CL2. Planning Project (PP) is the only process area which reaches capability level 2, meanwhile, PMC and REQM are still in CL 1 or in performed level. This research reveals several weaknesses of existing UMM-USU software. Therefore, this study proposes several recommendations for UMM-USU to improve capability level for observed process areas.

  12. Quality Improvement Initiatives in Colorectal Surgery: Value of Physician Feedback.

    PubMed

    Waters, Joshua A; Francone, Todd; Marcello, Peter W; Roberts, Patricia L; Schoetz, David J; Read, Thomas E; Stafford, Caitlin; Ricciardi, Rocco

    2017-02-01

    The impact of process improvement through surgeon feedback on outcomes is unclear. We sought to evaluate the effect of biannual surgeon-specific feedback on outcomes and adherence to departmental and Surgical Care Improvement Project process measures on colorectal surgery outcomes. This was a retrospective analysis of prospectively collected 100% capture surgical quality improvement data. This study was conducted at the department of colorectal surgery at a tertiary care teaching hospital from January 2008 through December 2013. Each surgeon was provided with biannual feedback on process adherence and surgeon-specific outcomes of urinary tract infection, deep vein thrombosis, surgical site infection, anastomotic leak, 30-day readmission, reoperation, and mortality. We recorded adherence to Surgical Care Improvement Project process measures and departmentally implemented measures (ie, anastomotic leak testing) as well as surgeon-specific outcomes. We abstracted 7975 operations. There was no difference in demographics, laparoscopy, or blood loss. Adherence to catheter removal increased from 73% to 100% (p < 0.0001), whereas urinary tract infection decreased 52% (p < 0.01). Adherence to thromboprophylaxis administration remained unchanged as did the deep vein thrombosis rate (p = not significant). Adherence to preoperative antibiotic administration increased from 72% to 100% (p < 0.0001), whereas surgical site infection did not change (7.6%-6.6%; p = 0.3). There were 2589 operative encounters with anastomoses. For right-sided anastomoses, the proportion of handsewn anastomoses declined from 19% to 1.5% (p < 0.001). For left-sided anastomoses, without diversion, anastomotic leak testing adherence increased from 88% to 95% (p < 0.01). Overall leak rate decreased from 5.2% to 2.9% (p < 0.05). Concurrent process changes make isolation of the impact from individual process improvement changes challenging. Nearly complete adherence to process measures for deep vein thrombosis and surgical site infection did not lead to measureable outcomes improvement. Process measure adherence was associated with decreased rate of anastomotic leak and urinary tract infection. Biannual surgeon-specific feedback of outcomes was associated with improved process measure adherence and improvement in surgical quality.

  13. Development and participant assessment of a practical quality improvement educational initiative for surgical residents.

    PubMed

    Sellers, Morgan M; Hanson, Kristi; Schuller, Mary; Sherman, Karen; Kelz, Rachel R; Fryer, Jonathan; DaRosa, Debra; Bilimoria, Karl Y

    2013-06-01

    As patient-safety and quality efforts spread throughout health care, the need for physician involvement is critical, yet structured training programs during surgical residency are still uncommon. Our objective was to develop an extended quality-improvement curriculum for surgical residents that included formal didactics and structured practical experience. Surgical trainees completed an 8-hour didactic program in quality-improvement methodology at the start of PGY3. Small teams developed practical quality-improvement projects based on needs identified during clinical experience. With the assistance of the hospital's process-improvement team and surgical faculty, residents worked through their selected projects during the following year. Residents were anonymously surveyed after their participation to assess the experience. During the first 3 years of the program, 17 residents participated, with 100% survey completion. Seven quality-improvement projects were developed, with 57% completing all DMAIC (Define, Measure, Analyze, Improve, Control) phases. Initial projects involved issues of clinical efficiency and later projects increasingly focused on clinical care questions. Residents found the experience educationally important (65%) and believed they were well equipped to lead similar initiatives in the future (70%). Based on feedback, the timeline was expanded from 12 to 24 months and changed to start in PGY2. Developing an extended curriculum using both didactic sessions and applied projects to teach residents the theory and implementation of quality improvement is possible and effective. It addresses the ACGME competencies of practice-based improvement and learning and systems-based practice. Our iterative experience during the past 3 years can serve as a guide for other programs. Copyright © 2013 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  14. Updating and improving methodology for prioritizing highway project locations on the strategic intermodal system (SIS).

    DOT National Transportation Integrated Search

    2016-04-01

    The Florida Department of Transportation (FDOT) District One developed the Congestion Management Process : (CMP) system to prioritize low-cost, near-term highway improvements on the Strategic Intermodal System (SIS). : The existing CMP system is desi...

  15. Research for Policy (R4P): development of a reflection tool for researchers to improve knowledge utilization.

    PubMed

    Hegger, Ingrid; Marks, Lisanne K; Janssen, Susan W J; Schuit, Albertine J; Keijsers, Jolanda F M; van Oers, Hans A M

    2016-09-30

    To improve knowledge utilization in policymaking, alignment between researchers and policymakers during knowledge production is essential, but difficult to maintain. In three previously reported case studies, we extensively evaluated complex research projects commissioned by policymakers to investigate how alignment is achieved in a research process and to discover ways to enhance knowledge contributions to health policy. In the present study, we investigated how the findings of these three research projects could be integrated into a practical tool for researchers to enhance their contribution to evidence-based policy. A cross-case analysis was conducted to integrate the findings of the evaluation of the three research projects and to identify important alignment areas in these projects. By means of an iterative process, we prepared a tool that includes reflection questions for researchers. The "Research for Policy" tool was tested with input from the project managers of three new research projects. Based on the findings, the final version of the Research for Policy tool was prepared. By cross-case analysis of the three case studies, the following important alignment areas were identified: the goal, quality, relevance, timing, and presentation of research, the tasks and authorities of actors, the consultative structure and vertical alignment within organizations, and the organizational environment. The project managers regarded the Research for Policy tool as a useful checklist for addressing the important alignment areas in a research project. Based on their feedback, the illustrative examples from the case studies were added to the reflection questions. The project managers suggested making the tool accessible not only to researchers but also to policymakers. The format of the Research for Policy tool was further adjusted to users' needs by adding clickable links. Alignment between research and policymaking requires continuous efforts and a clear understanding of process issues in the research project. The Research for Policy tool offers practical alignment guidance and facilitates reflection on process issues, which supports researchers in aligning with policymakers and in acting in a context-sensitive way.

  16. Improving assessment and modelling of climate change impacts on global terrestrial biodiversity.

    PubMed

    McMahon, Sean M; Harrison, Sandy P; Armbruster, W Scott; Bartlein, Patrick J; Beale, Colin M; Edwards, Mary E; Kattge, Jens; Midgley, Guy; Morin, Xavier; Prentice, I Colin

    2011-05-01

    Understanding how species and ecosystems respond to climate change has become a major focus of ecology and conservation biology. Modelling approaches provide important tools for making future projections, but current models of the climate-biosphere interface remain overly simplistic, undermining the credibility of projections. We identify five ways in which substantial advances could be made in the next few years: (i) improving the accessibility and efficiency of biodiversity monitoring data, (ii) quantifying the main determinants of the sensitivity of species to climate change, (iii) incorporating community dynamics into projections of biodiversity responses, (iv) accounting for the influence of evolutionary processes on the response of species to climate change, and (v) improving the biophysical rule sets that define functional groupings of species in global models. Published by Elsevier Ltd.

  17. 7 CFR 4280.102 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Improvements Program § 4280.102 General. (a) Sections 4280.103 through 4280.106 discuss definitions, exception... evaluation process, and post-grant Federal requirements for both the simplified and full application processes. Sections 4280.115 through 4280.117 address project planning, development, and completion as...

  18. Using Lean-Six Sigma to reduce hemolysis in the emergency care center in a collaborative quality improvement project with the hospital laboratory.

    PubMed

    Damato, Charlotte; Rickard, Dana

    2015-03-01

    As part of a strategic quality improvement plan, laboratory management at Sarasota Memorial Health Care System (SMHCS) focused its efforts on improving preanalytical work flow and blood collection processes-both negatively affected by hemolyzed specimens. When hemolysis is detected in a blood specimen, blood may need to be re-collected, resulting in bottlenecks and rework all along the value stream. From July through December 2009, hemolysis averaged 9.8% in the Emergency Care Center (ECC) and 3.4% housewide. The goal was set to reduce hemolysis to 2%. The project team identified hemolysis as one of seven factors contributing to non-value-added activities and bottlenecks in blood collection and preanalytical processes. Observations and interviews helped to identify error-prone practices and process variation. To verify the root causes of hemolysis, the findings were compared against best practices. The team developed a housewide protocol, standardized collection processes, created competency-based training, and enhanced ECC hiring practices. During December 2010-March 2011, following initial housewide interventions and ECC self-sustaining solutions, ECC hemolysis decreased by 91%-from 9.8% (423 hemolyzed/4,295 collected) to 0.88% (58 hemolyzed/6,560 collected). Housewide hemolysis decreased by 59%-from 3.4% (2,046 hemolyzed/60,307 collected) to 1.39% (619 hemolyzed/44,528 collected). Since the project, hemolysis has continued to trend downward; the mean percentage has consistently been < .05% for the ECC and < 1% housewide. Lean-Six Sigma tools helped to pinpoint hemolysis as a key inefficiency in blood collection and preanalytical work flow. Although focused on the ECC, the project team standardized blood collection practices and instituted quality devices to achieve hemolysis reductions housewide.

  19. [Analysis of evaluation process of research projects submitted to the Fondo de Investigación Sanitaria, Spain].

    PubMed

    Prieto Carles, C; Gómez-Gerique, J; Gutiérrez Millet, V; Veiga de Cabo, J; Sanz Martul, E; Mendoza Hernández, J L

    2000-10-07

    At the present time it seems very clear that research improvement is both an unquestionable fact and the right way to develop technological innovation, services and patents. However, such improvement and corresponding finances needs to be done under fine and rigorous evaluation process as an assessment tool under which all the research projects applying to a public or private call for proposals should be submitted to assure a coherence point according to the investment to be made. At this end, the main target of this work has been focused to analysis and study the evaluation process traditionally made by Fondo de Investigación Sanitaria (FIS) as well as to propose most adequate modifications. A sample of 431 research projects corresponding to year 1998 proposal was analysed. The evaluation from FIS and ANEP (National Evaluation and Prospective Agency) was evaluated and scored (evaluation quality) in its main contents by 3 independent evaluators, the showed results submitted to a comparative frame between these agencies at indoor (FIS) and outdoor (FIS/ANEP) level. FIS evaluation had 20 commissions or areas of knowledge. The analysis indoor (FIS) clearly showed that evaluation quality was correlated to the assigned commission (F = 3.71; p < 0.001) and to the time last of the researched proposal (F = 3.42; p < 0.05) but no related to the evaluator. On the other hand, the quality of ANEP evaluation showed a correlated dependency of the three mentioned facts. In all terms, the ANEP evaluation was better than FIS for the three years time projects, but in did not show significant differences in one or two years time projects. In all cases, the evaluation with final results as negative (financing denied) showed an average quality higher than positive evaluation. The obtained results advice about the convenience of making some changes in the evaluative structure and to review the sort of FIS technical commissions focusing an improvement of the evaluation process.

  20. Fenestration system energy performance research, implementation, and international harmonization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGowan, Raymond F

    The research conducted by the NFRC and its contractors adds significantly to the understanding of several areas of investigation. NFRC enables manufacturers to rate fenestration energy performance to comply with building energy codes, participate in ENERGY STAR, and compete fairly. NFRC continuously seeks to improve its ratings and also seeks to simplify the rating process. Several research projects investigated rating improvement potential such as • Complex Product VT Rating Research • Window 6 and Therm 6 Validation Research Project • Complex Product VT Rating Research Conclusions from these research projects led to important changes and increased confidence in the existingmore » NFRC rating process. Conclusions from the Window 6/Therm 6 project will enable window manufacturers to rate an expanded array of products and improve existing ratings. Some research lead to an improved new rating method called the Component Modeling Approach. A primary goal of the CMA was a simplification of the commercial energy rating process to increase participation and make the commercial industry more competitive and code compliant. The project below contributed towards CMA development: • Component Modeling Approach Condensation Resistance Research NFRC continues to implement the Component Modeling Approach program. The program includes the CMA software tool, CMAST, and several procedural documents to govern the certification process. This significant accomplishment was a response the commercial fenestration industry’s need for a simplification of the present NFRC energy rating method (named site built). To date, most commercial fenestration is self-rated by a variety of techniques. The CMA enables commercial fenestration manufacturers to rate according to the NFRC 100/200 as most commercial energy codes require. International Harmonization NFRC achieved significant international harmonization success by continuing its licensing agreements with the Australian Fenestration Rating Council and the Association of Architectural Aluminum Manufacturers of South Africa (AAAMSA) to produce NFRC certified product ratings in their respective nations. NFRC worked in several other nations to introduce the NFRC ratings system: • India • China • Japan • Canada • Thailand • South Africa • Brazil • Korea NFRC attended or hosted several meetings in each of these nations establishing academic, commercial, industrial, and governmental contacts. NFRC presented the NFRC process and then necessary infrastructure steps necessary to achieve harmonization with the NFRC labeling system. NFRC looks forward to continued work toward harmonization in these nations and potentially others.« less

  1. 14 CFR § 1216.303 - NEPA process in NASA planning and decision making.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NEPA process in NASA planning and decision... Act (NEPA) § 1216.303 NEPA process in NASA planning and decision making. (a) NEPA requires the... integration of the NEPA process with NASA project and program planning improves Agency decisions and ensures...

  2. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry.

    PubMed

    Ortíz, Miguel A; Felizzola, Heriberto A; Nieto Isaza, Santiago

    2015-01-01

    The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also proposed so that these methods can be applied more adequate in six sigma project selection processes in healthcare.

  3. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry

    PubMed Central

    2015-01-01

    Background The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. Methods ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. Results The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. Conclusions ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also proposed so that these methods can be applied more adequate in six sigma project selection processes in healthcare. PMID:26391445

  4. A novel pre-processing technique for improving image quality in digital breast tomosynthesis.

    PubMed

    Kim, Hyeongseok; Lee, Taewon; Hong, Joonpyo; Sabir, Sohail; Lee, Jung-Ryun; Choi, Young Wook; Kim, Hak Hee; Chae, Eun Young; Cho, Seungryong

    2017-02-01

    Nonlinear pre-reconstruction processing of the projection data in computed tomography (CT) where accurate recovery of the CT numbers is important for diagnosis is usually discouraged, for such a processing would violate the physics of image formation in CT. However, one can devise a pre-processing step to enhance detectability of lesions in digital breast tomosynthesis (DBT) where accurate recovery of the CT numbers is fundamentally impossible due to the incompleteness of the scanned data. Since the detection of lesions such as micro-calcifications and mass in breasts is the purpose of using DBT, it is justified that a technique producing higher detectability of lesions is a virtue. A histogram modification technique was developed in the projection data domain. Histogram of raw projection data was first divided into two parts: One for the breast projection data and the other for background. Background pixel values were set to a single value that represents the boundary between breast and background. After that, both histogram parts were shifted by an appropriate amount of offset and the histogram-modified projection data were log-transformed. Filtered-backprojection (FBP) algorithm was used for image reconstruction of DBT. To evaluate performance of the proposed method, we computed the detectability index for the reconstructed images from clinically acquired data. Typical breast border enhancement artifacts were greatly suppressed and the detectability of calcifications and masses was increased by use of the proposed method. Compared to a global threshold-based post-reconstruction processing technique, the proposed method produced images of higher contrast without invoking additional image artifacts. In this work, we report a novel pre-processing technique that improves detectability of lesions in DBT and has potential advantages over the global threshold-based post-reconstruction processing technique. The proposed method not only increased the lesion detectability but also reduced typical image artifacts pronounced in conventional FBP-based DBT. © 2016 American Association of Physicists in Medicine.

  5. Achieving performance breakthroughs in an HMO business process through quality planning.

    PubMed

    Hanan, K B

    1993-01-01

    Kaiser Permanente's Georgia Region commissioned a quality planning team to design a new process to improve payments to its suppliers and vendors. The result of the team's effort was a 73 percent reduction in cycle time. This team's experiences point to the advantages of process redesign as a quality planning model, as well as some general guidelines for its most effective use in teams. If quality planning project teams are carefully configured, sufficiently expert in the existing process, and properly supported by management, organizations can achieve potentially dramatic improvements in process performance using this approach.

  6. [Company Wide Quality Control (total quality): methodological principles and intervention techniques for step-by-step improvement].

    PubMed

    Corbara, F; Di Cristofaro, E

    1996-01-01

    The concept of Quality is particularly up to date and not a new one for the Journal. The need for better Quality is a must also in Medical care. Quality doesn't mean additional costs and excessive burden for the co-workers. On the contrary, initial costs can be compensated for through a more rational utilisation of the resources. The consequent better service for the patient results in an ameliorated working environment, with high profits. Fundamental requirements for reaching concrete results are: 1) the convinced involvement in the idea of all levels (division, service, laboratory) in order to have the different groups act in synergism towards common goals; 2) the knowledge of appropriate methods. The Authors examine this last point with a deep analysis of the techniques involved in Company Wide Quality Control (C.W.Q.C.) or Total Quality. The improving process has to the continuous and proceed in small steps, each time being constituted by 4 different phases, represented by the PDCA cycle, or Demining wheel, where: P = PLAN, which means plan before acting; D = DO, perform what has been planned; C = CHECK, verify the results; A = ACT, standardize if the results are positive, repeat the process if negative. Each process of improvement implies a prior precise definition of a project, i.e. a problem whose solution has been planned. The project must always presume: a specific subject--a goal--one or more people to reach it--a limited time to work it out. The most effective way to ameliorate Quality is performing projects. Step by Step amelioration is synonymous of performance of many projects. A brilliant way to produce many projects remains their "industrialization", which can be reached by means of 6 basic criteria: 1) full involvement of the Direction; 2) potential co-working in the projects of all employees; 3) employment of simple instruments; 4) respect of a few procedural formalities; 5) rewarding of personnel; 6) continuous promotion of the concepts of quality and ongoing improvement. The Authors describe for each of the previous criteria approaching methods and best operative techniques, according C.W.Q.C.

  7. Monitoring outcomes with relational databases: does it improve quality of care?

    PubMed

    Clemmer, Terry P

    2004-12-01

    There are 3 key ingredients in improving quality of medial care: 1) using a scientific process of improvement, 2) executing the process at the lowest possible level in the organization, and 3) measuring the results of any change reliably. Relational databases when used within these guidelines are of great value in these efforts if they contain reliable information that is pertinent to the project and used in a scientific process of quality improvement by a front line team. Unfortunately, the data are frequently unreliable and/or not pertinent to the local process and is used by persons at very high levels in the organization without a scientific process and without reliable measurement of the outcome. Under these circumstances the effectiveness of relational databases in improving care is marginal at best, frequently wasteful and has the potential to be harmful. This article explores examples of these concepts.

  8. Can citizen science enhance public understanding of science?

    PubMed

    Bonney, Rick; Phillips, Tina B; Ballard, Heidi L; Enck, Jody W

    2016-01-01

    Over the past 20 years, thousands of citizen science projects engaging millions of participants in collecting and/or processing data have sprung up around the world. Here we review documented outcomes from four categories of citizen science projects which are defined by the nature of the activities in which their participants engage - Data Collection, Data Processing, Curriculum-based, and Community Science. We find strong evidence that scientific outcomes of citizen science are well documented, particularly for Data Collection and Data Processing projects. We find limited but growing evidence that citizen science projects achieve participant gains in knowledge about science knowledge and process, increase public awareness of the diversity of scientific research, and provide deeper meaning to participants' hobbies. We also find some evidence that citizen science can contribute positively to social well-being by influencing the questions that are being addressed and by giving people a voice in local environmental decision making. While not all citizen science projects are intended to achieve a greater degree of public understanding of science, social change, or improved science -society relationships, those projects that do require effort and resources in four main categories: (1) project design, (2) outcomes measurement, (3) engagement of new audiences, and (4) new directions for research. © The Author(s) 2015.

  9. Subarray Processing for Projection-based RFI Mitigation in Radio Astronomical Interferometers

    NASA Astrophysics Data System (ADS)

    Burnett, Mitchell C.; Jeffs, Brian D.; Black, Richard A.; Warnick, Karl F.

    2018-04-01

    Radio Frequency Interference (RFI) is a major problem for observations in Radio Astronomy (RA). Adaptive spatial filtering techniques such as subspace projection are promising candidates for RFI mitigation; however, for radio interferometric imaging arrays, these have primarily been used in engineering demonstration experiments rather than mainstream scientific observations. This paper considers one reason that adoption of such algorithms is limited: RFI decorrelates across the interferometric array because of long baseline lengths. This occurs when the relative RFI time delay along a baseline is large compared to the frequency channel inverse bandwidth used in the processing chain. Maximum achievable excision of the RFI is limited by covariance matrix estimation error when identifying interference subspace parameters, and decorrelation of the RFI introduces errors that corrupt the subspace estimate, rendering subspace projection ineffective over the entire array. In this work, we present an algorithm that overcomes this challenge of decorrelation by applying subspace projection via subarray processing (SP-SAP). Each subarray is designed to have a set of elements with high mutual correlation in the interferer for better estimation of subspace parameters. In an RFI simulation scenario for the proposed ngVLA interferometric imaging array with 15 kHz channel bandwidth for correlator processing, we show that compared to the former approach of applying subspace projection on the full array, SP-SAP improves mitigation of the RFI on the order of 9 dB. An example of improved image synthesis and reduced RFI artifacts for a simulated image “phantom” using the SP-SAP algorithm is presented.

  10. Conceptualizing impact assessment as a learning process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sánchez, Luis E., E-mail: lsanchez@usp.br; Mitchell, Ross, E-mail: ross.mitchell@ualberta.net

    This paper explores how project developers and their consultants, government regulators and stakeholders can learn from the impact assessment (IA) process, thus potentially improving its effectiveness and enhancing project sustainability. Despite the benefits that learning can bring to an organization, failure to learn appears commonplace both within the IA process and, once approved, subsequent industrial development. To nurture organizational learning through IA, enabling structures that foster information sharing and interpretation and enhance organizational memory are needed. In this paper learning outcomes are grouped into three categories: acquisition of knowledge and skills, developing new behaviors and developing sustainability-oriented norms and values.more » Means to achieve such outcomes include education and training, experiential learning, learning through public participation (social learning) and a ‘learning organization approach’. Societal expectations increasingly demand not only projects that ‘pass’ the review criteria of regulators, financiers and the community, but IA processes capable of delivering sustainable outcomes that include learning and sharing of knowledge. It is proposed that learning be treated as a purposeful – not as an accidental – outcome of IA, and facilitated by adopting a ‘learning organization approach’ coupled with best practice such as early stakeholder engagement. - Highlights: • Proponents are challenged to develop projects that deliver sustainable outcomes. • Passing the test of government approval may be insufficient to obtain a social license. • Learning by all stakeholders is vital to meet these challenges. • Learning outcomes have to go beyond instrumental learning to reach new behaviors, norms and values. • A “learning organization approach” can promote mutual learning and improve project design.« less

  11. Macroergonomic study of food sector company distribution centres.

    PubMed

    García Acosta, Gabriel; Lange Morales, Karen

    2008-07-01

    This study focussed on the work system design to be used by a Colombian food sector company for distributing products. It considered the concept of participative ergonomics, where people from the commercial, logistics, operation, occupational health areas worked in conjunction with the industrial designers, ergonomists who methodologically led the project. As a whole, the project was conceived as having five phases: outline, diagnosis, modelling the process, scalability, instrumentation. The results of the project translate into procedures for selecting, projecting a new distribution centre, the operational process model, a description of ergonomic systems that will enable specific work stations to be designed, the procedure for adapting existing warehouses. Strategically, this work helped optimise the company's processes and ensure that knowledge would be transferred within it. In turn, it became a primary prevention strategy in the field of health, aimed at reducing occupational risks, improving the quality of life at work.

  12. 28 CFR Appendix D to Part 61 - Office of Justice Assistance, Research, and Statistics Procedures Relating to the Implementation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of the NEPA process and policies of the agencies can be obtained from: Policy and Management Planning... funded efforts; training programs, court improvement projects, research, and gathering statistical data. (2) Minor renovation projects or remodeling. (c) Actions which normally require environmental...

  13. 28 CFR Appendix D to Part 61 - Office of Justice Assistance, Research, and Statistics Procedures Relating to the Implementation...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of the NEPA process and policies of the agencies can be obtained from: Policy and Management Planning... funded efforts; training programs, court improvement projects, research, and gathering statistical data. (2) Minor renovation projects or remodeling. (c) Actions which normally require environmental...

  14. 28 CFR Appendix D to Part 61 - Office of Justice Assistance, Research, and Statistics Procedures Relating to the Implementation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of the NEPA process and policies of the agencies can be obtained from: Policy and Management Planning... funded efforts; training programs, court improvement projects, research, and gathering statistical data. (2) Minor renovation projects or remodeling. (c) Actions which normally require environmental...

  15. Tools for Regeneration: Specific Ways To Help an Economy Thrive.

    ERIC Educational Resources Information Center

    Rodale Press, Inc., Emmaus, PA.

    This paper describes some of the tools that The Regeneration Project, in Emmaus, Pennsylvania, has developed for use in the process of local economic improvement. One or more of these may be of interest to other individuals in communities that wish to undertake similar projects. Regenerative development provides markets for locally produced goods…

  16. Auditing Communication Effectiveness in Higher Education: A Team-Based Study by MBA Students

    ERIC Educational Resources Information Center

    Hart, Claudia; Plemmons, Tony; Stulz, Karin; Vroman, Margo

    2017-01-01

    A regional University in the United States implemented an AQIP (Academic Quality Improvement Program) Action Project with a goal of developing processes for effective leadership communication. An MBA (Masters of Business Administration) class conducted a university-wide communication audit to assist with the AQIP project. Quantitative and…

  17. Physically Handicapped in Science: Final Project Report.

    ERIC Educational Resources Information Center

    O'Brien, Maureen B.; And Others

    A two-year project was conducted by St. Mary's Junior College to improve the science literacy of visually-impaired students (VIS) through the adaptation of instructional methods and materials. A four-step process was used: (1) learning materials were reviewed to identify problem areas; (2) preliminary adaptations were made based on the review; (3)…

  18. Getting Girls in the Game: Action Research in the Gymnasium

    ERIC Educational Resources Information Center

    Robinson, Daniel B.

    2013-01-01

    This article presents an action research project focused on improving physical education (PE) for adolescent female students. One university researcher, three male PE teachers, and 13 of their most disengaged female students participated in the one-year, two-cycle, action research project. The process and results are offered so that future PE…

  19. Improving Student Achievement in a Multidisciplinary Context

    ERIC Educational Resources Information Center

    Chapman, Amanda; Bloxham, Sue

    2004-01-01

    This article analyses interim findings of an ongoing action research project into the use of assessment criteria and grade descriptors in the assessment process. The project is multidisciplinary and covers areas as diverse as Sports Sociology, Economics, Youth and Community Studies, and Education. The idea is to equip first-year students with the…

  20. Increasing the Utility of Information Systems in Schools: Lessons from the Literature. Multilevel Evaluation Systems Project.

    ERIC Educational Resources Information Center

    Herman, Joan

    The Multilevel Evaluation Systems Project is exploring the requirements for information systems that could help teachers and administrators sort through, analyze, and apply comprehensive information about their students, community, instructional processes, and outcomes to improve their schools. Toward this end, a multi-disciplinary literature…

  1. Controlling Curriculum Redesign with a Process Improvement Model

    ERIC Educational Resources Information Center

    Drinka, Dennis; Yen, Minnie Yi-Miin

    2008-01-01

    A portion of the curriculum for a Management Information Systems degree was redesigned to enhance the experiential learning of students by focusing it on a three-semester community-based system development project. The entire curriculum was then redesigned to have a project-centric focus with each course in the curriculum contributing to the…

  2. Improved Weather and Power Forecasts for Energy Operations - the German Research Project EWeLiNE

    NASA Astrophysics Data System (ADS)

    Lundgren, Kristina; Siefert, Malte; Hagedorn, Renate; Majewski, Detlev

    2014-05-01

    The German energy system is going through a fundamental change. Based on the energy plans of the German federal government, the share of electrical power production from renewables should increase to 35% by 2020. This means that, in the near future at certain times renewable energies will provide a major part of Germany's power production. Operating a power supply system with a large share of weather-dependent power sources in a secure way requires improved power forecasts. One of the most promising strategies to improve the existing wind power and PV power forecasts is to optimize the underlying weather forecasts and to enhance the collaboration between the meteorology and energy sectors. Deutscher Wetterdienst addresses these challenges in collaboration with Fraunhofer IWES within the research project EWeLiNE. The overarching goal of the project is to improve the wind and PV power forecasts by combining improved power forecast models and optimized weather forecasts. During the project, the numerical weather prediction models COSMO-DE and COSMO-DE-EPS (Ensemble Prediction System) by Deutscher Wetterdienst will be generally optimized towards improved wind power and PV forecasts. For instance, it will be investigated whether the assimilation of new types of data, e.g. power production data, can lead to improved weather forecasts. With regard to the probabilistic forecasts, the focus is on the generation of ensembles and ensemble calibration. One important aspect of the project is to integrate the probabilistic information into decision making processes by developing user-specified products. In this paper we give an overview of the project and present first results.

  3. Overview of the Photovoltaic Manufacturing Technology (PVMaT) project

    NASA Astrophysics Data System (ADS)

    Witt, C. E.; Mitchell, R. L.; Mooney, G. D.

    1993-08-01

    The Photovoltaic Manufacturing Technology (PVMaT) project is a historic government/industry photovoltaic (PV) manufacturing R&D partnership composed of joint efforts between the federal government (through the US Department of Energy) and members of the US PV industry. The project's ultimate goal is to ensure that the US industry retains and extends its world leadership role in the manufacture and commercial development of PV components and systems. PVMaT is designed to do this by helping the US PV industry improve manufacturing processes, accelerate manufacturing cost reductions for PV modules, improve commercial product performance, and lay the groundwork for a substantial scale-up of US-based PV manufacturing capacities. Phase 1 of the project, the problem identification phase, was completed in early 1991. Phase 2, the problem solution phase, which addresses process-specific problems of specific manufacturers, is now underway with an expected duration of 5 years. Phase 3 addresses R&D problems that are relatively common to a number of PV companies or the PV industry as a whole. These 'generic' problem areas are being addressed through a teamed research approach.

  4. Intermittent sizing on carbon fiber for composite application

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Norris, Jr, Robert E.; Paulauskas, Felix L.; Ozcan, Soydan

    Intermittent sizing is a technique designed to improve the bonding of carbon fiber to a resin when manufacturing composite parts. The purpose of this technique is to improve Sheet Molding Composites (SMC) made of non-continuous carbon fibers while using regular material. At the end of the project, tests showed that improved mechanical properties have been achieved using this technique compared to conventional process. Mechanical properties have been improved by 110% for the peak tensile stress and by 60% for the modulus at the laboratory scale. In this project, Continental Structural Plastics and ORNL have worked to demonstrate the scalability andmore » viability of commercialization of this technique.« less

  5. Development of a Multi-Domain Assessment Tool for Quality Improvement Projects.

    PubMed

    Rosenbluth, Glenn; Burman, Natalie J; Ranji, Sumant R; Boscardin, Christy K

    2017-08-01

    Improving the quality of health care and education has become a mandate at all levels within the medical profession. While several published quality improvement (QI) assessment tools exist, all have limitations in addressing the range of QI projects undertaken by learners in undergraduate medical education, graduate medical education, and continuing medical education. We developed and validated a tool to assess QI projects with learner engagement across the educational continuum. After reviewing existing tools, we interviewed local faculty who taught QI to understand how learners were engaged and what these faculty wanted in an ideal assessment tool. We then developed a list of competencies associated with QI, established items linked to these competencies, revised the items using an iterative process, and collected validity evidence for the tool. The resulting Multi-Domain Assessment of Quality Improvement Projects (MAQIP) rating tool contains 9 items, with criteria that may be completely fulfilled, partially fulfilled, or not fulfilled. Interrater reliability was 0.77. Untrained local faculty were able to use the tool with minimal guidance. The MAQIP is a 9-item, user-friendly tool that can be used to assess QI projects at various stages and to provide formative and summative feedback to learners at all levels.

  6. Improvement in Herpes Zoster Vaccination in Patients with Rheumatoid Arthritis: A Quality Improvement Project.

    PubMed

    Sheth, Heena; Moreland, Larry; Peterson, Hilary; Aggarwal, Rohit

    2017-01-01

    To improve herpes zoster (HZ) vaccination rates in high-risk patients with rheumatoid arthritis (RA) being treated with immunosuppressive therapy. This quality improvement project was based on the pre- and post-intervention design. The project targeted all patients with RA over the age of 60 years while being treated with immunosuppressive therapy (not with biologics) seen in 13 rheumatology outpatient clinics. The study period was from July 2012 to June 2013 for the pre-intervention and February 2014 to January 2015 for the post-intervention phase. The electronic best practice alert (BPA) for HZ vaccination was developed; it appeared on electronic medical records during registration and medication reconciliation of the eligible patient by the medical assistant. The BPA was designed to electronically identify patient eligibility and to enable the physician to order the vaccine or to document refusal or deferral reason. Education regarding vaccine guidelines, BPA, vaccination process, and feedback were crucial components of the project interventions. The vaccination rates were compared using the chi-square test. We evaluated 1823 and 1554 eligible patients with RA during the pre-intervention and post-intervention phases, respectively. The HZ vaccination rates, reported as patients vaccinated among all eligible patients, improved significantly from the pre-intervention period of 10.1% (184/1823) to 51.7% (804/1554) during the intervention phase (p < 0.0001). The documentation rates (vaccine received, vaccine ordered, patient refusal, and deferral reasons) increased from 28% (510/1823) to 72.9% (1133/1554; p < 0.0001). The HZ infection rates decreased significantly from 2% to 0.3% (p = 0.002). Electronic identification of vaccine eligibility and BPA significantly improved HZ vaccination rates. The process required minimal modification of clinic work flow and did not burden the physician's time, and has the potential for self-sustainability and generalizability.

  7. Effectiveness of Systems Engineering (SE) Tailored for the Science & Technology (S&T) Environment: Improvement of USAF Airdrop Accuracy

    DTIC Science & Technology

    2011-10-27

    public release; distribution is unlimited  Dr. Keith Bowman, AFRL, Precision Airdrop ( PAD ) Program Manager  Ms. Carol Ventresca, SynGenics Corporation...Presentation Outline  Entrance Criteria for PAD  Integrated Product Team (IPT)  S&T SE Process Steps  Initial Project S&T Development Strategy...Entrance Criteria for PAD  Integrated Product Team (IPT)  S&T SE Process Steps  Initial Project S&T Development Strategy  User Understanding of

  8. Dimensions of Improving School Districts.

    ERIC Educational Resources Information Center

    Pajak, Edward; Glickman, Carl D.

    To broaden the scope of effective schools research by including change processes and a wider unit of study, this project investigated three Georgia school districts demonstrating improvements in student achievement for three consecutive years. Research identified these elements: (1) the sequence and influence of events, factors, and people…

  9. Increasing Productivity with Microcomputers: Key to Improvement of Special Educattion in the 1980s.

    ERIC Educational Resources Information Center

    Brady, Richard C.; Dodge, Bernard J.

    1982-01-01

    Five microcomputer applications which may improve the management of teacher education programs are noted (database management, word processing, spread sheets, project scheduling and management, and test scoring), and six steps in introducing microcomputers into a department are discussed. (CL)

  10. Curbing variations in packaging process through Six Sigma way in a large-scale food-processing industry

    NASA Astrophysics Data System (ADS)

    Desai, Darshak A.; Kotadiya, Parth; Makwana, Nikheel; Patel, Sonalinkumar

    2015-03-01

    Indian industries need overall operational excellence for sustainable profitability and growth in the present age of global competitiveness. Among different quality and productivity improvement techniques, Six Sigma has emerged as one of the most effective breakthrough improvement strategies. Though Indian industries are exploring this improvement methodology to their advantage and reaping the benefits, not much has been presented and published regarding experience of Six Sigma in the food-processing industries. This paper is an effort to exemplify the application of Six Sigma quality improvement drive to one of the large-scale food-processing sectors in India. The paper discusses the phase wiz implementation of define, measure, analyze, improve, and control (DMAIC) on one of the chronic problems, variations in the weight of milk powder pouch. The paper wraps up with the improvements achieved and projected bottom-line gain to the unit by application of Six Sigma methodology.

  11. Process Improvements: Aerobic Food Waste Composting at ISF Academy

    NASA Astrophysics Data System (ADS)

    Lau, Y. K.

    2015-12-01

    ISF Academy, a school with 1500 students in Hong Kong, installed an aerobic food waste composting system in November of 2013. The system has been operational for over seven months; we will be making improvements to the system to ensure the continued operational viability and quality of the compost. As a school we are committed to reducing our carbon footprint and the amount of waste we send to the local landfill. Over an academic year we produce approximately 27 metric tons of food waste. Our system processes the food waste to compost in 14 days and the compost is used by our primary school students in a organic farming project.There are two areas of improvement: a) if the composting system becomes anaerobic, there is an odor problem that is noticed by the school community; we will be testing the use of a bio-filter to eliminate the odor problem and, b) we will be working with an equipment vendor from Australia to install an improved grease trap system. The grease and oil that is collected will be sold to a local company here in Hong Kong that processes used cooking oil for making biofuels. This system will include a two stage filtration system and a heated vessel for separating the oil from the waste water.The third project will be to evaluate biodegradable cutlery for the compositing in the system. Currently, we use a significant quantity of non-biodegradable cutlery that is then thrown away after one use. Several local HK companies are selling biodegradable cutlery, but we need to evaluate the different products to determine which ones will work with our composting system. The food waste composting project at ISF Academy demonstrates the commitment of the school community to a greener environment for HK, the above listed projects will improve the operation of the system.

  12. BIOWINOL TECHNOLOGIES: A HYBRID GREEN PROCESS FOR BIOFUEL PRODUCTION – PHASE 2

    EPA Science Inventory

    The development of hollow fiber membrane (HFM) reactor will result in improved gas utilization that will positively impact overall process efficiencies. Successful completion of this project could result in the development of many decentralized biofuel production systems near ...

  13. Progress towards CSR RL06 GRACE gravity solutions

    NASA Astrophysics Data System (ADS)

    Save, Himanshu

    2017-04-01

    The GRACE project plans to re-processes the GRACE mission data in order to be consistent with the first gravity products released by the GRACE-FO project. The next generation Release-06 (RL06) gravity products from GRACE will include the improvements in GRACE Level-1 data products, background gravity models and the processing methodology. This paper will outline the planned improvements for CSR - RL06 and discuss the preliminary results. This paper will discuss the evolution of the quality of the GRACE solutions, especially over the past few years. We will also discuss the possible challenges we may face in connecting/extending the measurements of mass fluxes from the GRACE era to the GRACE-FO era due quality of the GRACE solutions from recent years.

  14. Process-Improvement Cost Model for the Emergency Department.

    PubMed

    Dyas, Sheila R; Greenfield, Eric; Messimer, Sherri; Thotakura, Swati; Gholston, Sampson; Doughty, Tracy; Hays, Mary; Ivey, Richard; Spalding, Joseph; Phillips, Robin

    2015-01-01

    The objective of this report is to present a simplified, activity-based costing approach for hospital emergency departments (EDs) to use with Lean Six Sigma cost-benefit analyses. The cost model complexity is reduced by removing diagnostic and condition-specific costs, thereby revealing the underlying process activities' cost inefficiencies. Examples are provided for evaluating the cost savings from reducing discharge delays and the cost impact of keeping patients in the ED (boarding) after the decision to admit has been made. The process-improvement cost model provides a needed tool in selecting, prioritizing, and validating Lean process-improvement projects in the ED and other areas of patient care that involve multiple dissimilar diagnoses.

  15. Experimental power density distribution benchmark in the TRIGA Mark II reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Snoj, L.; Stancar, Z.; Radulovic, V.

    2012-07-01

    In order to improve the power calibration process and to benchmark the existing computational model of the TRIGA Mark II reactor at the Josef Stefan Inst. (JSI), a bilateral project was started as part of the agreement between the French Commissariat a l'energie atomique et aux energies alternatives (CEA) and the Ministry of higher education, science and technology of Slovenia. One of the objectives of the project was to analyze and improve the power calibration process of the JSI TRIGA reactor (procedural improvement and uncertainty reduction) by using absolutely calibrated CEA fission chambers (FCs). This is one of the fewmore » available power density distribution benchmarks for testing not only the fission rate distribution but also the absolute values of the fission rates. Our preliminary calculations indicate that the total experimental uncertainty of the measured reaction rate is sufficiently low that the experiments could be considered as benchmark experiments. (authors)« less

  16. Using the integrated nurse leadership program to reduce sepsis mortality.

    PubMed

    Kliger, Julie; Singer, Sara J; Hoffman, Frank H

    2015-06-01

    The Integrated Nurse Leadership Program (INLP) is a collaborative improvement model focused on developing practical leadership skills of nurses and other frontline clinicians to lead quality improvement efforts. Sepsis is a major challenge to treat because it arises unpredictably and can progress rapidly. Nine San Francisco Bay Area hospitals participated in a 22-month INLP Sepsis Mortality Reduction Project to improve sepsis detection and management. The INLP focused on developing leadership and process improvement skills of nurses and other frontline clinicians. Teams of trained clinicians then implemented three strategies to improve early identification and timely treatment of sepsis: (1) sepsis screening of all patients, with diagnostic testing according to protocol; (2) timely treatment on the basis of key elements of Early Goal-Directed Therapy (EGDT); and (3) ongoing data review. Each hospital agreed to pursue the goal of reducing sepsis mortality by 15% by the end of the project. In the data collection period (baseline, July-December 2008 and project completion, January-June 2011), team members showed strong improvement in perceived leadership skills, team effectiveness, and ability to improve care quality. During this period, sepsis mortality for eight of the participating hospitals (Hospital 9 joined the project six months after it began) decreased by 43.7%-from 28% in the baseline period to 16% at project completion. Sepsis mortality rates trended downward for all hospitals, significantly decreasing (p<.05 at one hospital, p<.01 for four hospitals). In addition to improvement in safety culture and management of septic patients, hospitals participating in the INLP Sepsis Mortality Reduction Project achieved reductions in sepsis mortality during the study period and sustained reductions for more than one year later. The INLP model can be readily applied beyond sepsis management and mortality to other quality problems.

  17. Advanced process control framework initiative

    NASA Astrophysics Data System (ADS)

    Hill, Tom; Nettles, Steve

    1997-01-01

    The semiconductor industry, one the world's most fiercely competitive industries, is driven by increasingly complex process technologies and global competition to improve cycle time, quality, and process flexibility. Due to the complexity of these problems, current process control techniques are generally nonautomated, time-consuming, reactive, nonadaptive, and focused on individual fabrication tools and processes. As the semiconductor industry moves into higher density processes, radical new approaches are required. To address the need for advanced factory-level process control in this environment, Honeywell, Advanced Micro Devices (AMD), and SEMATECH formed the Advanced Process Control Framework Initiative (APCFI) joint research project. The project defines and demonstrates an Advanced Process Control (APC) approach based on SEMATECH's Computer Integrated Manufacturing (CIM) Framework. Its scope includes the coordination of Manufacturing Execution Systems, process control tools, and wafer fabrication equipment to provide necessary process control capabilities. Moreover, it takes advantage of the CIM Framework to integrate and coordinate applications from other suppliers that provide services necessary for the overall system to function. This presentation discusses the key concept of model-based process control that differentiates the APC Framework. This major improvement over current methods enables new systematic process control by linking the knowledge of key process settings to desired product characteristics that reside in models created with commercial model development tools The unique framework-based approach facilitates integration of commercial tools and reuse of their data by tying them together in an object-based structure. The presentation also explores the perspective of each organization's involvement in the APCFI project. Each has complementary goals and expertise to contribute; Honeywell represents the supplier viewpoint, AMD represents the user with 'real customer requirements', and SEMATECH provides a consensus-building organization that widely disseminates technology to suppliers and users in the semiconductor industry that face similar equipment and factory control systems challenges.

  18. Mission operations and command assurance: Flight operations quality improvements

    NASA Technical Reports Server (NTRS)

    Welz, Linda L.; Bruno, Kristin J.; Kazz, Sheri L.; Potts, Sherrill S.; Witkowski, Mona M.

    1994-01-01

    Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality in flight mission operations. From a system engineering view, MO&CA facilitates communication and problem-solving among flight teams and provides continuous solving among flight teams and provides continuous process improvement to reduce risk in mission operations by addressing human factors. The MO&CA task has evolved from participating as a member of the spacecraft team, to an independent team reporting directly to flight project management and providing system level assurance. JPL flight projects have benefited significantly from MO&CA's effort to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit from previous and ongoing flight experience.

  19. A Research Planning Assessment for Applications of Artificial Intelligence in Manufacturing.

    DTIC Science & Technology

    1986-01-01

    to apply,based on their needs.___ *PROJECT OESCRIPTION/ APPROACH : -The project will apply A_ in r’ejpesent ni ri O siri ct...of this project are essential for the practical implementation of Al-based approaches to improving unit processes. This work will enable advances in ...July 1985 to 1 August 1985. The authors wish to thank all workshop participants for their contributions to this effort. In particular, we wish to

  20. Use of a Nutrition Behavior Change Counseling Tool: Lessons from a Rapid Qualitative Assessment in Eastern Zambia

    PubMed Central

    Weiss, Ingrid; Stepanovic, Serena; Chinyemba, Ulembe; Bateman, Jessica; Hemminger, Carolyn; Burrows, Emily

    2016-01-01

    The U.S. Agency for International Development Feed the Future Mawa Project – led by Catholic Relief Services – aims to improve food and economic security for farming households in Zambia’s Eastern Province. Mawa employs social and behavior change (SBC) strategies with households and communities to improve nutrition and reduce stunting among children under two (CU2). To support these strategies, sub-partner University Research Co., LLC employed a participatory process to develop a series of 35 action cards, each illustrating one project-promoted behavior, that are used at household and community group levels. Caregivers of CU2 are given a full set of action cards to promote household dialogue and support for the promoted behaviors. As a final step in the action card tool development process, a qualitative rapid assessment was conducted 1 month after implementation to investigate preliminary ways action cards were being used, and if the methods of using the cards had the potential to impact behavior change. The research team conducted nine key informant interviews and four focus group discussions with Mawa staff and administered 41 qualitative interview questionnaires with project participants in the Chipata and Lundazi districts. Although not based on a representative sampling frame, the assessment produced valuable results for program improvement purposes. It also provided a feedback mechanism for community-based staff and project participants, a crucial step in the participatory tool development process. The assessment found that Mawa staff at every level use action cards combined with at least one other social behavior change tool for each nutrition intervention. Our results suggest that Mawa staff and project participants share a common understanding of the cards’ purpose. Each group noted that the cards provide a visual cue for action and reinforce previous Mawa nutrition messages. Intended uses confirmed by the assessment include encouraging household cooperation, negotiating behavior change, telling stories, and integrating messages with other project sectors. Based on the findings, recommendations for future project activities include aligning efforts against a theory of change to optimize use of all SBC tools; leveraging action card use to strengthen cross-sectoral integration within Mawa; and specific ongoing monitoring of action card use to improve activity implementation. PMID:27630980

  1. Results of the Software Process Improvement Efforts of the Early Adopters in NAVAIR 4.0

    DTIC Science & Technology

    2007-12-01

    and customer satisfaction. AIRSpeed utilizes a structured, problem solving methodology called DMAIC (Define, Measure, Analyze, Improve, Control...widely used in business. DMAIC leads project teams through the logical steps from problem definition to problem resolution. Each phase has a specific set...costs and improving productivity and customer satisfaction. AIRSpeed utilizes the DMAIC (Define, Measure, Analyze, Improve, Control) structured problem

  2. Heather Head | NREL

    Science.gov Websites

    ; standardization, process improvement, monitoring and reporting; energy-water-food nexus project implementation efficiency and innovative renewable energy programs and policies Community solar; Energy-water-food nexus

  3. Improving the coordination of patients' medication management: a regional Finnish development project.

    PubMed

    Kivekäs, Eija; Luukkonen, Irmeli; Mykkänen, Juha; Saranto, Kaija

    2014-01-01

    In this paper, we present an overview of activities and results from a regional development project in Finland. The aim in this project was to analyze how healthcare providers produce and receive information on a patient's medication, and to identify opportunities to improve the quality, effectiveness, availability and collaboration of social and healthcare services in relation to medication information. The project focused on the most important points in patients' medication management such as home care and care transitions. In a regional development project, data was gathered by interviews and a multi professional workshop. The study revealed that medication information reached only some professionals and lay caregivers despite electronic patient record (EPR) systems and tools. Differences in work processes related to medication reconciliation and information management were discussed in the group meeting and were regarded as a considerable risk for patient safety.

  4. Assimilation of satellite altimetry data in hydrological models for improved inland surface water information: Case studies from the "Sentinel-3 Hydrologic Altimetry Processor prototypE" project (SHAPE)

    NASA Astrophysics Data System (ADS)

    Gustafsson, David; Pimentel, Rafael; Fabry, Pierre; Bercher, Nicolas; Roca, Mónica; Garcia-Mondejar, Albert; Fernandes, Joana; Lázaro, Clara; Ambrózio, Américo; Restano, Marco; Benveniste, Jérôme

    2017-04-01

    This communication is about the Sentinel-3 Hydrologic Altimetry Processor prototypE (SHAPE) project, with a focus on the components dealing with assimilation of satellite altimetry data into hydrological models. The SHAPE research and development project started in September 2015, within the Scientific Exploitation of Operational Missions (SEOM) programme of the European Space Agency. The objectives of the project are to further develop and assess recent improvement in altimetry data, processing algorithms and methods for assimilation in hydrological models, with the overarching goal to support improved scientific use of altimetry data and improved inland water information. The objective is also to take scientific steps towards a future Inland Water dedicated processor on the Sentinel-3 ground segment. The study focuses on three main variables of interest in hydrology: river stage, river discharge and lake level. The improved altimetry data from the project is used to estimate river stage, river discharge and lake level information in a data assimilation framework using the hydrological dynamic and semi-distributed model HYPE (Hydrological Predictions for the Environment). This model has been developed by SMHI and includes data assimilation module based on the Ensemble Kalman filter method. The method will be developed and assessed for a number of case studies with available in situ reference data and satellite altimetry data based on mainly the CryoSat-2 mission on which the new processor will be run; Results will be presented from case studies on the Amazon and Danube rivers and Lake Vänern (Sweden). The production of alti-hydro products (water level time series) are improved thanks to the use of water masks. This eases the geo-selection of the CryoSat-2 altimetric measurements since there are acquired from a geodetic orbit and are thus spread along the river course in space and and time. The specific processing of data from this geodetic orbit space-time pattern will be discussed as well as the subsequent possible strategies for data assimilation into models (and eventually highlight a generalized approach toward multi-mission data processing). Notably, in case of data assimilation along the course of rivers, the river slope might be estimated and compensated for, in order to produce local water level "pseudo time series" at arbitrary locations, and specifically at model's inlets.

  5. Software metrics: The key to quality software on the NCC project

    NASA Technical Reports Server (NTRS)

    Burns, Patricia J.

    1993-01-01

    Network Control Center (NCC) Project metrics are captured during the implementation and testing phases of the NCCDS software development lifecycle. The metrics data collection and reporting function has interfaces with all elements of the NCC project. Close collaboration with all project elements has resulted in the development of a defined and repeatable set of metrics processes. The resulting data are used to plan and monitor release activities on a weekly basis. The use of graphical outputs facilitates the interpretation of progress and status. The successful application of metrics throughout the NCC project has been instrumental in the delivery of quality software. The use of metrics on the NCC Project supports the needs of the technical and managerial staff. This paper describes the project, the functions supported by metrics, the data that are collected and reported, how the data are used, and the improvements in the quality of deliverable software since the metrics processes and products have been in use.

  6. Improving Neural Recording Technology at the Nanoscale

    NASA Astrophysics Data System (ADS)

    Ferguson, John Eric

    Neural recording electrodes are widely used to study normal brain function (e.g., learning, memory, and sensation) and abnormal brain function (e.g., epilepsy, addiction, and depression) and to interface with the nervous system for neuroprosthetics. With a deep understanding of the electrode interface at the nanoscale and the use of novel nanofabrication processes, neural recording electrodes can be designed that surpass previous limits and enable new applications. In this thesis, I will discuss three projects. In the first project, we created an ultralow-impedance electrode coating by controlling the nanoscale texture of electrode surfaces. In the second project, we developed a novel nanowire electrode for long-term intracellular recordings. In the third project, we created a means of wirelessly communicating with ultra-miniature, implantable neural recording devices. The techniques developed for these projects offer significant improvements in the quality of neural recordings. They can also open the door to new types of experiments and medical devices, which can lead to a better understanding of the brain and can enable novel and improved tools for clinical applications.

  7. Sentinel-3 SAR Altimetry over Coastal and Open Ocean: performance assessment and improved retrieval methods in the ESA SCOOP Project.

    NASA Astrophysics Data System (ADS)

    Benveniste, J.; Cotton, D.; Moreau, T.; Raynal, M.; Varona, E.; Cipollini, P.; Cancet, M.; Martin, F.; Fenoglio-Marc, L.; Naeije, M.; Fernandes, J.; Lazaro, C.; Restano, M.; Ambrózio, A.

    2017-12-01

    The ESA Sentinel-3 satellite, launched in February 2016 as a part of the Copernicus programme, is the second satellite to operate a SAR mode altimeter. The Sentinel 3 Synthetic Aperture Radar Altimeter (SRAL) is based on the heritage from Cryosat-2, but this time complemented by a Microwave Radiometer (MWR) to provide a wet troposphere correction, and operating at Ku and C-Bands to provide an accurate along-track ionospheric correction. The SRAL is operated in SAR mode over the whole ocean and promises increased performance w.r.t. conventional altimetry. SCOOP (SAR Altimetry Coastal & Open Ocean Performance) is a project funded under the ESA SEOM (Scientific Exploitation of Operational Missions) Programme Element, started in September 2015, to characterise the expected performance of Sentinel-3 SRAL SAR mode altimeter products, in the coastal zone and open-ocean, and then to develop and evaluate enhancements to the baseline processing scheme in terms of improvements to ocean measurements. There is also a work package to develop and evaluate an improved Wet Troposphere correction for Sentinel-3, based on the measurements from the on-board MWR, further enhanced mostly in the coastal and polar regions using third party data, and provide recommendations for use. In this presentation we present results from the SCOOP project that demonstrate the excellent performance of SRAL in terms of measurement precision, and we illustrate the development and testing of new processing approaches designed specifically to improve performance close to the coast. The SCOOP test data sets and relevant documentation are available to external researchers on application to the project team. At the end of the project recommendations for further developments and implementations will be provided through a scientific roadmap.

  8. No More Waits and Delays: Streamlining Workflow to Decrease Patient Time of Stay for Image-guided Musculoskeletal Procedures.

    PubMed

    Cheung, Yvonne Y; Goodman, Eric M; Osunkoya, Tomiwa O

    2016-01-01

    Long wait times limit our ability to provide the right care at the right time and are commonly products of inefficient workflow. In 2013, the demand for musculoskeletal (MSK) procedures increased beyond our department's ability to provide efficient and timely service. We initiated a quality improvement (QI) project to increase efficiency and decrease patient time of stay. Our project team included three MSK radiologists, one senior resident, one technologist, one administrative assistant/scheduler, and the lead technologist. We adopted and followed the Lean Six Sigma DMAIC (define, measure, analyze, improve, and control) approach. The team used tools such as voice of the customer (VOC), along with affinity and SIPOC (supplier, input, process, output, customer) diagrams, to understand the current process, identify our customers, and develop a project charter in the define stage. During the measure stage, the team collected data, created a detailed process map, and identified wastes with the value stream mapping technique. Within the analyze phase, a fishbone diagram helped the team to identify critical root causes for long wait times. Scatter plots revealed relationships among time variables. Team brainstorming sessions generated improvement ideas, and selected ideas were piloted via plan, do, study, act (PDSA) cycles. The control phase continued to enable the team to monitor progress using box plots and scheduled reviews. Our project successfully decreased patient time of stay. The highly structured and logical Lean Six Sigma approach was easy to follow and provided a clear course of action with positive results. (©)RSNA, 2016.

  9. MO-F-211-01: Methods for Completing Practice Quality Improvement (PQI).

    PubMed

    Johnson, J; Brown, K; Ibbott, G; Pawlicki, T

    2012-06-01

    Practice Quality Improvement (PQI) is becoming an expected part of routine practice in healthcare as an approach to provide more efficient, effective and high quality care. Additionally, as part of the ABR's Maintenance of Certification (MOC) pathway, medical physicists are now expected to complete a PQI project. This session will describe the history behind and benefits of the ABR's MOC program, provide details of quality improvement methods and how to successfully complete a PQI project. PQI methods include various commonly used engineering and management tools. The Plan-Do-Study-Act (PDSA) cycle will be presented as one project planning and implementation tool. Other PQI analysis instruments such as flowcharts, Pareto charts, process control charts and fishbone diagrams will also be explained with examples. Cause analysis, solution development and implementation, and post-implementation measurement will be presented. Project identification and definition as well as appropriate measurement tool selection will be offered. Methods to choose key quality metrics (key quality indicators) will also be addressed. Several sample PQI projects and templates available through the AAPM and other organizations will be described. At least three examples of completed PQI projects will be shared. 1. Identify and define a PQI project 2. Identify and select measurement methods/techniques for use with the PQI project 3. Describe example(s) of completed projects. © 2012 American Association of Physicists in Medicine.

  10. Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Starr, Stan; Steinrock, T. (Technical Monitor)

    2001-01-01

    This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.

  11. A Corporate-Wide Application of Organizational Behavior Management.

    ERIC Educational Resources Information Center

    Wikoff, Martin B.

    1984-01-01

    Describes a longitudinal project in which organizational behavior management (OBM) procedures have been applied to improve performance of plant employees, increase sales of contract furniture, accelerate response time to customer inquiries, increase orders processed, and reduce processing errors at Krueger, a contract and institutional furniture…

  12. Materials Genome Initiative

    NASA Technical Reports Server (NTRS)

    Vickers, John

    2015-01-01

    The Materials Genome Initiative (MGI) project element is a cross-Center effort that is focused on the integration of computational tools to simulate manufacturing processes and materials behavior. These computational simulations will be utilized to gain understanding of processes and materials behavior to accelerate process development and certification to more efficiently integrate new materials in existing NASA projects and to lead to the design of new materials for improved performance. This NASA effort looks to collaborate with efforts at other government agencies and universities working under the national MGI. MGI plans to develop integrated computational/experimental/ processing methodologies for accelerating discovery and insertion of materials to satisfy NASA's unique mission demands. The challenges include validated design tools that incorporate materials properties, processes, and design requirements; and materials process control to rapidly mature emerging manufacturing methods and develop certified manufacturing processes

  13. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    PubMed

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  14. A Recipe for Streamlining Mission Management

    NASA Technical Reports Server (NTRS)

    Mitchell, Andrew E.; Semancik, Susan K.

    2004-01-01

    This paper describes a project's design and implementation for streamlining mission management with knowledge capture processes across multiple organizations of a NASA directorate. Thc project's focus is on standardizing processes and reports; enabling secure information access and case of maintenance; automating and tracking appropriate workflow rules through process mapping; and infusing new technologies. This paper will describe a small team's experiences using XML technologies through an enhanced vendor suite of applications integrated on Windows-based platforms called the Wallops Integrated Scheduling and Document Management System (WISDMS). This paper describes our results using this system in a variety of endeavors, including providing range project scheduling and resource management for a Range and Mission Management Office; implementing an automated Customer Feedback system for a directorate; streamlining mission status reporting across a directorate; and initiating a document management, configuration management and portal access system for a Range Safety Office's programs. The end result is a reduction of the knowledge gap through better integration and distribution of information, improved process performance, automated metric gathering, and quicker identification of problem areas and issues. However, the real proof of the pudding comes through overcoming the user's reluctance to replace familiar, seasoned processes with new technology ingredients blended with automated procedures in an untested recipe. This paper shares some of the team's observations that led to better implementation techniques, as well as an IS0 9001 Best Practices citation. This project has provided a unique opportunity to advance NASA's competency in new technologies, as well as to strategically implement them within an organizational structure, while wetting the appetite for continued improvements in mission management.

  15. A planned care approach and patient registry to improve adherence to clinical guidelines for the diagnosis and management of attention-deficit/hyperactivity disorder.

    PubMed

    Geltman, Paul L; Fried, Lise E; Arsenault, Lisa N; Knowles, Alice M; Link, David A; Goldstein, Joel N; Perrin, James M; Hacker, Karen A

    2015-01-01

    Attention-deficit/hyperactivity disorder (ADHD) affects almost 2.4 million US children. Because American Academy of Pediatrics guidelines for ADHD recommend use of standardized diagnostic instruments, regular follow-up and the chronic care model, this pilot project sought to implement and assess an electronic registry of patients with ADHD combined with care coordination by a planned care team. This quality improvement project was structured with 2 intervention and 2 control clinics to facilitate evaluation of the use of a planned care system for management of ADHD. Care teams included a pediatrician, nurse, medical assistant, and care coordinator and tracked patients using an electronic registry with data drawn from the EMR. Clinical work flows were pilot tested to facilitate use of the Vanderbilt scales and their incorporation into the EMR at intervention sites. Outcome measures included 2 recommended clinical follow-ups based on HEDIS measures as well as use of the Vanderbilt rating scales. Initiation phase measure was for follow-up after initiating medication, while the continuation phase measure was for subsequent follow-up during the first year of treatment. Measures were monitored during the project year and then also in the ensuing period of spread of the intervention to other sites. Although the modified HEDIS initiation phase measure for patients newly on medication remained static at approximately 50% throughout the project period, the continuation phase measure showed improvement from 35% at baseline to 45% at the end of the project assessment year, a 29% increase. Follow-up for patients stable on medications also remained unchanged during the project period, but during subsequent spreading of the intervention to nonproject sites, follow-up of these patients improved to over 90%. In adjusted analyses, patients with ADHD at intervention sites were over 2 times more likely than patients at control sites to have had a Vanderbilt score documented in their records. The project achieved modest improvements in the diagnostic and treatment process for patients with ADHD. The use of a planned care system and electronic patient registry shows promise for improving the diagnosis and treatment process for patients with ADHD. Copyright © 2015 Academic Pediatric Association. Published by Elsevier Inc. All rights reserved.

  16. How an educational improvement project improved the summative evaluation of medical students.

    PubMed

    Hoffman, K G; Brown, R Margaret A; Gay, J W; Headrick, L A

    2009-08-01

    At the University of Missouri-Columbia School of Medicine (USA) "commitment to improving quality and safety in healthcare" is one of eight key characteristics set as goals for our graduates. As educators, commitment to continuous improvement in the educational experience has been modelled through improvement of the Medical Student Performance Evaluation (MSPE) letter (formerly the Dean's letter). This educational improvement project decreased waste, increased collaboration and developed locally useful knowledge. By applying continuous improvement principles to the construction of the MSPE the overall efficiency of the process could be enhanced, and the MSPE committee was able to spend less cognitive energy on structure and format and focus more on the content of the letters. Four MSPE cycles have been completed using a new Web-based system; after each cycle, additional enhancements were identified and implemented. This work adds to the literature, as it describes the application of continuous improvement principles to an educational system.

  17. How Configuration Management (CM) Can Help Project Teams To Innovate and Communicate

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis

    2009-01-01

    Traditionally, CM is relegated to a support role in project management activities. CM s traditional functions of identification, change control, status accounting, and audits/verification are still necessary and play a vital role. However, this presentation proposes CM s role in a new and innovative manner that will significantly improve communication throughout the organization and, in turn, augment the project s success. CM s new role is elevated to the project management level, above the engineering or sub-project level in the Work Breakdown Structure (WBS), where it can more effectively accommodate changes, reduce corrective actions, and ensure that requirements are clear, concise, and valid, and that results conform to the requirements. By elevating CM s role in project management and orchestrating new measures, a new communication will emerge that will improve information integrity, structured baselines, interchangeability/traceability, metrics, conformance to standards, and standardize the best practices in the organization. Overall project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements.

  18. Advanced in-duct sorbent injection for SO{sub 2} control. Final technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stouffer, M.R.; Withium, J.A.; Rosenhoover, W.A.

    1994-12-01

    The objective of this research project was to develop a second generation duct sorbent injection technology as a cost-effective compliance option for the 1990 Clean Air Act Amendments. Research and development work was focused on the Advanced Coolside process, which showed the potential for exceeding the original performance targets of 90% SO{sub 2} removal and 60% sorbent utilization. Process development was conducted in a 1000 acfm pilot plant. The pilot plant testing showed that the Advanced Coolside process can achieve 90% SO{sub 2} removal at sorbent utilizations up to 75%. The testing also showed that the process has the potentialmore » to achieve very high removal efficiency (90 to >99%). By conducting conceptual process design and economic evaluations periodically during the project, development work was focused on process design improvements which substantially lowered process capital and operating costs, A final process economic study projects capital costs less than one half of those for limestone forced oxidation wet FGD. Projected total SO{sub 2} control cost is about 25% lower than wet FGD for a 260 MWe plant burning a 2.5% sulfur coal. A waste management study showed the acceptability of landfill disposal; it also identified a potential avenue for by-product utilization which should be further investigated. Based on the pilot plant performance and on the above economic projections, future work to scale up the Advanced Coolside process is recommended.« less

  19. Integrating ecophysiology and forest landscape models to improve projections of drought effects under climate change

    Treesearch

    Eric J. Gustafson; Arjan M.G. De Bruijn; Robert E. Pangle; Jean-Marc Limousin; Nate G. McDowell; William T. Pockman; Brian R. Sturtevant; Jordan D. Muss; Mark E. Kubiske

    2015-01-01

    Fundamental drivers of ecosystem processes such as temperature and precipitation are rapidly changing and creating novel environmental conditions. Forest landscape models (FLM) are used by managers and policy-makers to make projections of future ecosystem dynamics under alternative management or policy options, but the links between the fundamental drivers and...

  20. Moving Knowledge Around: Strategies for Fostering Equity within Educational Systems

    ERIC Educational Resources Information Center

    Ainscow, Mel

    2012-01-01

    This paper describes and analyses the work of a large scale improvement project in England in order to find more effective ways of fostering equity within education systems. The project involved an approach based on an analysis of local context, and used processes of networking and collaboration in order to make better use of available expertise.…

  1. Enhancements to the Water Erosion Prediction Project (WEPP) for modeling large snow-dominated mountainous forest watersheds

    Treesearch

    Anurag Srivastava; Joan Q. Wu; William J. Elliot; Erin S. Brooks

    2015-01-01

    The Water Erosion Prediction Project (WEPP) model, originally developed for hillslope and small watershed applications, simulates complex interactive processes influencing erosion. Recent incorporations to the model have improved the subsurface hydrology components for forest applications. Incorporation of channel routing has made the WEPP model well suited for large...

  2. It's Academic: Shelf-Ready Standing Orders at the University of Florida's Smathers Library.

    ERIC Educational Resources Information Center

    Crump, Michele; Carrico, Steven

    2001-01-01

    Describes an outsourcing project at the University of Florida library in which their supplier of domestic serial standing orders supplied a large percentage of the standing orders with complete physical processing. Discusses cost effectiveness, low error rate, and the resulting improvement in workflow efficiency that made the project a success.…

  3. Connectedness Is Key: The Evolution of a Process-Driven High School Program

    ERIC Educational Resources Information Center

    Nitza, Amy; Dobias, Brian

    2015-01-01

    This article discusses a collaborative project to improve freshman transition into a high school and to increase connectedness among high school students. What started out for the authors, a high school guidance counselor and a counselor educator, as two independent projects on similar topics, evolved in a scholarly partnership that seeks to link…

  4. Creating Quality Improvement Culture in Public Health Agencies

    PubMed Central

    Mahanna, Elizabeth; Joly, Brenda; Zelek, Michael; Riley, William; Verma, Pooja; Fisher, Jessica Solomon

    2014-01-01

    Objectives. We conducted case studies of 10 agencies that participated in early quality improvement efforts. Methods. The agencies participated in a project conducted by the National Association of County and City Health Officials (2007–2008). Case study participants included health directors and quality improvement team leaders and members. We implemented multiple qualitative analysis processes, including cross-case analysis and logic modeling. We categorized agencies according to the extent to which they had developed a quality improvement culture. Results. Agencies were conducting informal quality improvement projects (n = 4), conducting formal quality improvement projects (n = 3), or creating a quality improvement culture (n = 4). Agencies conducting formal quality improvement and creating a quality improvement culture had leadership support for quality improvement, participated in national quality improvement initiatives, had a greater number of staff trained in quality improvement and quality improvement teams that met regularly with decision-making authority. Agencies conducting informal quality improvement were likely to report that accreditation is the major driver for quality improvement work. Agencies creating a quality improvement culture were more likely to have a history of evidence-based decision-making and use quality improvement to address emerging issues. Conclusions. Our findings support previous research and add the roles of national public health accreditation and emerging issues as factors in agencies’ ability to create and sustain a quality improvement culture. PMID:24228680

  5. A Web-Based Monitoring System for Multidisciplinary Design Projects

    NASA Technical Reports Server (NTRS)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  6. Application of the Ecosystem Diagnosis and Treatment Method to the Grande Ronde Model Watershed project : Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mobrand, Lars Erik; Lestelle, Lawrence C.

    In the spring of 1994 a technical planning support project was initiated by the Grande Ronde Model Watershed Board of Directors (Board) with funding from the Bonneville Power Administration. The project was motivated by a need for a science based method for prioritizing restoration actions in the basin that would promote effectiveness and accountability. In this section the authors recall the premises for the project. The authors also present a set of recommendations for implementing a watershed planning process that incorporates a science-based framework to help guide decision making. This process is intended to assist the Grande Ronde Model Watershedmore » Board in its effort to plan and implement watershed improvement measures. The process would also assist the Board in coordinating its efforts with other entities in the region. The planning process is based on an approach for developing an ecosystem management strategy referred to as the Ecosystem Diagnosis and Treatment (EDT) method (Lichatowich et al. 1995, Lestelle et al. 1996). The process consists of an on-going planning cycle. Included in this cycle is an assessment of the ability of the watershed to support and sustain natural resources and other economic and societal values. This step in the process, which the authors refer to as the diagnosis, helps guide the development of actions (also referred to as treatments) aimed at improving the conditions of the watershed to achieve long-term objectives. The planning cycle calls for routinely reviewing and updating, as necessary, the basis for the diagnosis and other analyses used by the Board in adopting actions for implementation. The recommendations offered here address this critical need to habitually update the information used in setting priorities for action.« less

  7. How can model comparison help improving species distribution models?

    PubMed

    Gritti, Emmanuel Stephan; Gaucherel, Cédric; Crespo-Perez, Maria-Veronica; Chuine, Isabelle

    2013-01-01

    Today, more than ever, robust projections of potential species range shifts are needed to anticipate and mitigate the impacts of climate change on biodiversity and ecosystem services. Such projections are so far provided almost exclusively by correlative species distribution models (correlative SDMs). However, concerns regarding the reliability of their predictive power are growing and several authors call for the development of process-based SDMs. Still, each of these methods presents strengths and weakness which have to be estimated if they are to be reliably used by decision makers. In this study we compare projections of three different SDMs (STASH, LPJ and PHENOFIT) that lie in the continuum between correlative models and process-based models for the current distribution of three major European tree species, Fagussylvatica L., Quercusrobur L. and Pinussylvestris L. We compare the consistency of the model simulations using an innovative comparison map profile method, integrating local and multi-scale comparisons. The three models simulate relatively accurately the current distribution of the three species. The process-based model performs almost as well as the correlative model, although parameters of the former are not fitted to the observed species distributions. According to our simulations, species range limits are triggered, at the European scale, by establishment and survival through processes primarily related to phenology and resistance to abiotic stress rather than to growth efficiency. The accuracy of projections of the hybrid and process-based model could however be improved by integrating a more realistic representation of the species resistance to water stress for instance, advocating for pursuing efforts to understand and formulate explicitly the impact of climatic conditions and variations on these processes.

  8. How Can Model Comparison Help Improving Species Distribution Models?

    PubMed Central

    Gritti, Emmanuel Stephan; Gaucherel, Cédric; Crespo-Perez, Maria-Veronica; Chuine, Isabelle

    2013-01-01

    Today, more than ever, robust projections of potential species range shifts are needed to anticipate and mitigate the impacts of climate change on biodiversity and ecosystem services. Such projections are so far provided almost exclusively by correlative species distribution models (correlative SDMs). However, concerns regarding the reliability of their predictive power are growing and several authors call for the development of process-based SDMs. Still, each of these methods presents strengths and weakness which have to be estimated if they are to be reliably used by decision makers. In this study we compare projections of three different SDMs (STASH, LPJ and PHENOFIT) that lie in the continuum between correlative models and process-based models for the current distribution of three major European tree species, Fagus sylvatica L., Quercus robur L. and Pinus sylvestris L. We compare the consistency of the model simulations using an innovative comparison map profile method, integrating local and multi-scale comparisons. The three models simulate relatively accurately the current distribution of the three species. The process-based model performs almost as well as the correlative model, although parameters of the former are not fitted to the observed species distributions. According to our simulations, species range limits are triggered, at the European scale, by establishment and survival through processes primarily related to phenology and resistance to abiotic stress rather than to growth efficiency. The accuracy of projections of the hybrid and process-based model could however be improved by integrating a more realistic representation of the species resistance to water stress for instance, advocating for pursuing efforts to understand and formulate explicitly the impact of climatic conditions and variations on these processes. PMID:23874779

  9. Six Sigma methods applied to cryogenic coolers assembly line

    NASA Astrophysics Data System (ADS)

    Ventre, Jean-Marc; Germain-Lacour, Michel; Martin, Jean-Yves; Cauquil, Jean-Marc; Benschop, Tonny; Griot, René

    2009-05-01

    Six Sigma method have been applied to manufacturing process of a rotary Stirling cooler: RM2. Name of the project is NoVa as main goal of the Six Sigma approach is to reduce variability (No Variability). Project has been based on the DMAIC guideline following five stages: Define, Measure, Analyse, Improve, Control. Objective has been set on the rate of coolers succeeding performance at first attempt with a goal value of 95%. A team has been gathered involving people and skills acting on the RM2 manufacturing line. Measurement System Analysis (MSA) has been applied to test bench and results after R&R gage show that measurement is one of the root cause for variability in RM2 process. Two more root causes have been identified by the team after process mapping analysis: regenerator filling factor and cleaning procedure. Causes for measurement variability have been identified and eradicated as shown by new results from R&R gage. Experimental results show that regenerator filling factor impacts process variability and affects yield. Improved process haven been set after new calibration process for test bench, new filling procedure for regenerator and an additional cleaning stage have been implemented. The objective for 95% coolers succeeding performance test at first attempt has been reached and kept for a significant period. RM2 manufacturing process is now managed according to Statistical Process Control based on control charts. Improvement in process capability have enabled introduction of sample testing procedure before delivery.

  10. Closing the loop on improvement: Packaging experience in the Software Engineering Laboratory

    NASA Technical Reports Server (NTRS)

    Waligora, Sharon R.; Landis, Linda C.; Doland, Jerry T.

    1994-01-01

    As part of its award-winning software process improvement program, the Software Engineering Laboratory (SEL) has developed an effective method for packaging organizational best practices based on real project experience into useful handbooks and training courses. This paper shares the SEL's experience over the past 12 years creating and updating software process handbooks and training courses. It provides cost models and guidelines for successful experience packaging derived from SEL experience.

  11. Research on Anaerobic Digestion: Optimization and Scalability of Mixed High-strength Food Processing Wastes for Renewable Biogas Energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yu, Zhongtang; Hitzhusen, Fredrick

    2012-12-27

    This research project developed and improved anaerobic digestion technologies, created a comprehensive Inventory of Ohio Biomass and a database of microorganisms of anaerobic digesters, and advanced knowledge and understanding of the underpinning microbiology of the anaerobic digestion process. The results and finding of this research project may be useful for future development and implementation of anaerobic digesters, especially at livestock farms. Policy makers and investors may also find the information on the biomass availability in Ohio and valuation of energy projects useful in policy making and making of investment decisions. The public may benefit from the information on biogas asmore » an energy source and the potential impact of anaerobic digester projects on their neighborhoods.« less

  12. Inpatient preanalytic process improvements.

    PubMed

    Wagar, Elizabeth A; Phipps, Ron; Del Guidice, Robert; Middleton, Lavinia P; Bingham, John; Prejean, Cheryl; Johnson-Hamilton, Martha; Philip, Pheba; Le, Ngoc Han; Muses, Waheed

    2013-12-01

    Phlebotomy services are a common target for preanalytic improvements. Many new, quality engineering tools have recently been applied in clinical laboratories. However, data on relatively few projects have been published. This example describes a complete application of current, quality engineering tools to improve preanalytic phlebotomy services. To decrease the response time in the preanalytic inpatient laboratory by 25%, to reduce the number of incident reports related to preanalytic phlebotomy, and to make systematic process changes that satisfied the stakeholders. The Department of Laboratory Medicine, General Services Section, at the University of Texas MD Anderson Cancer Center (Houston) is responsible for inpatient phlebotomy in a 24-hour operation, which serves 689 inpatient beds. The study director was project director of the Division of Pathology and Laboratory Medicine's Quality Improvement Section and was assisted by 2 quality technologists and an industrial engineer from MD Anderson Office of Performance Improvement. After implementing each solution, using well-recognized, quality tools and metrics, the response time for blood collection decreased by 23%, which was close to meeting the original responsiveness goal of 25%. The response time between collection and arrival in the laboratory decreased by 8%. Applicable laboratory-related incident reports were reduced by 43%. Comprehensive application of quality tools, such as statistical control charts, Pareto diagrams, value-stream maps, process failure modes and effects analyses, fishbone diagrams, solution prioritization matrices, and customer satisfaction surveys can significantly improve preset goals for inpatient phlebotomy.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maloney, J.; Kiepper, A.F.; Simonetta, R.J.

    The volume examines monitoring and reporting procedures applicable to performance and productivity. The managers of three transit systems of varying sizes discuss how productivity has been increased within their systems. The Pittsburgh discussion reviews a variety of capital projects and management improvement initiatives undertaken by Port Authority Transit, including development of maintenance manuals and an absenteeism reduction project. The Houston discussion describes how the property used a management study to identify needed organizational change and restructuring. The Ann Arbor discussion focuses on a set of service standards and performance indicators adopted to focus the management improvement process.

  14. Using Unified Modelling Language (UML) as a process-modelling technique for clinical-research process improvement.

    PubMed

    Kumarapeli, P; De Lusignan, S; Ellis, T; Jones, B

    2007-03-01

    The Primary Care Data Quality programme (PCDQ) is a quality-improvement programme which processes routinely collected general practice computer data. Patient data collected from a wide range of different brands of clinical computer systems are aggregated, processed, and fed back to practices in an educational context to improve the quality of care. Process modelling is a well-established approach used to gain understanding and systematic appraisal, and identify areas of improvement of a business process. Unified modelling language (UML) is a general purpose modelling technique used for this purpose. We used UML to appraise the PCDQ process to see if the efficiency and predictability of the process could be improved. Activity analysis and thinking-aloud sessions were used to collect data to generate UML diagrams. The UML model highlighted the sequential nature of the current process as a barrier for efficiency gains. It also identified the uneven distribution of process controls, lack of symmetric communication channels, critical dependencies among processing stages, and failure to implement all the lessons learned in the piloting phase. It also suggested that improved structured reporting at each stage - especially from the pilot phase, parallel processing of data and correctly positioned process controls - should improve the efficiency and predictability of research projects. Process modelling provided a rational basis for the critical appraisal of a clinical data processing system; its potential maybe underutilized within health care.

  15. Quality Management Framework for Total Diet Study centres in Europe.

    PubMed

    Pité, Marina; Pinchen, Hannah; Castanheira, Isabel; Oliveira, Luisa; Roe, Mark; Ruprich, Jiri; Rehurkova, Irena; Sirot, Veronique; Papadopoulos, Alexandra; Gunnlaugsdóttir, Helga; Reykdal, Ólafur; Lindtner, Oliver; Ritvanen, Tiina; Finglas, Paul

    2018-02-01

    A Quality Management Framework to improve quality and harmonization of Total Diet Study practices in Europe was developed within the TDS-Exposure Project. Seventeen processes were identified and hazards, Critical Control Points and associated preventive and corrective measures described. The Total Diet Study process was summarized in a flowchart divided into planning and practical (sample collection, preparation and analysis; risk assessment analysis and publication) phases. Standard Operating Procedures were developed and implemented in pilot studies in five organizations. The flowchart was used to develop a quality framework for Total Diet Studies that could be included in formal quality management systems. Pilot studies operated by four project partners were visited by project assessors who reviewed implementation of the proposed framework and identified areas that could be improved. The quality framework developed can be the starting point for any Total Diet Study centre and can be used within existing formal quality management approaches. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Domain analysis for the reuse of software development experiences

    NASA Technical Reports Server (NTRS)

    Basili, V. R.; Briand, L. C.; Thomas, W. M.

    1994-01-01

    We need to be able to learn from past experiences so we can improve our software processes and products. The Experience Factory is an organizational structure designed to support and encourage the effective reuse of software experiences. This structure consists of two organizations which separates project development concerns from organizational concerns of experience packaging and learning. The experience factory provides the processes and support for analyzing, packaging, and improving the organization's stored experience. The project organization is structured to reuse this stored experience in its development efforts. However, a number of questions arise: What past experiences are relevant? Can they all be used (reused) on our current project? How do we take advantage of what has been learned in other parts of the organization? How do we take advantage of experience in the world-at-large? Can someone else's best practices be used in our organization with confidence? This paper describes approaches to help answer these questions. We propose both quantitative and qualitative approaches for effectively reusing software development experiences.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bates, Robert; McConnell, Elizabeth

    Machining methods across many industries generally require multiple operations to machine and process advanced materials, features with micron precision, and complex shapes. The resulting multiple machining platforms can significantly affect manufacturing cycle time and the precision of the final parts, with a resultant increase in cost and energy consumption. Ultrafast lasers represent a transformative and disruptive technology that removes material with micron precision and in a single step manufacturing process. Such precision results from athermal ablation without modification or damage to the remaining material which is the key differentiator between ultrafast laser technologies and traditional laser technologies or mechanical processes.more » Athermal ablation without modification or damage to the material eliminates post-processing or multiple manufacturing steps. Combined with the appropriate technology to control the motion of the work piece, ultrafast lasers are excellent candidates to provide breakthrough machining capability for difficult-to-machine materials. At the project onset in early 2012, the project team recognized that substantial effort was necessary to improve the application of ultrafast laser and precise motion control technologies (for micromachining difficult-to-machine materials) to further the aggregate throughput and yield improvements over conventional machining methods. The project described in this report advanced these leading-edge technologies thru the development and verification of two platforms: a hybrid enhanced laser chassis and a multi-application testbed.« less

  18. Assessing the influence of Environmental Impact Assessments on science and policy: an analysis of the Three Gorges Project.

    PubMed

    Tullos, Desiree

    2009-07-01

    The need to understand and minimize negative environmental outcomes associated with large dams has both contributed to and benefited from the introduction and subsequent improvements in the Environmental Impact Assessment (EIA) process. However, several limitations in the EIA process remain, including those associated with the uncertainty and significance of impact projections. These limitations are directly related to the feedback between science and policy, with information gaps in scientific understanding discovered through the EIA process contributing valuable recommendations on critical focus areas for prioritizing and funding research within the fields of ecological conservation and river engineering. This paper presents an analysis of the EIA process for the Three Gorges Project (TGP) in China as a case study for evaluating this feedback between the EIA and science and policy. For one of the best-studied public development projects in the world, this paper presents an investigation into whether patterns exist between the scientific interest (via number of publications) in environmental impacts and (a) the identification of impacts as uncertain or priority by the EIA, (b) decisions or political events associated with the dam, and (c) impact type. This analysis includes the compilation of literature on TGP, characterization of ecosystem interactions and responses to TGP through a hierarchy of impacts, coding of EIA impacts as "uncertain" impacts that require additional study and "priority" impacts that have particularly high significance, mapping of an event chronology to relate policies, institutional changes, and decisions about TGP as "events" that could influence the focus and intensity of scientific investigation, and analysis of the number of publications by impact type and order within the impact hierarchy. From these analyses, it appears that the availability and consistency of scientific information limit the accuracy of environmental impact projections. These analyses also suggest a lack of direct feedback between the EIA process and emerging science, as indicated by the failure of literature to focus on issues related to the design and management of TGP, ultimately challenging the environmental sustainability of the project. While the EIA process has enormous potential for improving both the basic sciences and the planning and sustainability of hydrodevelopment, important institutional changes need to occur for this potential to be realized. This paper concludes with recommendations about those institutional changes needed to improve the feedback between the science and policy, and ultimately the environmental sustainability, of large dams.

  19. United States Supports Distributed Wind Technology Improvements; NREL (National Renewable Energy Laboratory)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sinclair, Karin

    2015-06-15

    This presentation provides information on the activities conducted through the Competitiveness Improvement Project (CIP), initiated in 2012 by the U.S. Department of Energy (DOE) and executed through the National Renewable Energy Laboratory (NREL) to support the distributed wind industry. The CIP provides research and development funding and technical support to improve distributed wind turbine technology and increase the competitiveness of U.S. small and midsize wind turbine manufacturers. Through this project, DOE/NREL assists U.S. manufacturers to lower the levelized cost of energy of wind turbines through component improvements, manufacturing process upgrades, and turbine testing. Ultimately, this support is expected to leadmore » to turbine certification through testing to industry-recognized wind turbine performance and safety standards.« less

  20. Business Models for Training and Performance Improvement Departments

    ERIC Educational Resources Information Center

    Carliner, Saul

    2004-01-01

    Although typically applied to entire enterprises, the concept of business models applies to training and performance improvement groups. Business models are "the method by which firm[s] build and use [their] resources to offer.. value." Business models affect the types of projects, services offered, skills required, business processes, and type of…

  1. Implementing health improvement cuttings in conifer stands in southwestern highlands

    Treesearch

    William F. Watson; B.J. Stokes; B.R. Hartsough; S.A. Haglund

    1995-01-01

    This study evaluated the costs of mechanized harvesting systems being used on forest health improvement projects on the Mescalero Reservation in New Mexico. Three feller bunchers with diiering slope capabilities were used. Grapple skidders delivered whole trees to a flail/chipper for processing into pulp quality chips.

  2. Using Technology and Inquiry to Improve Student Understanding of Watershed Concepts

    ERIC Educational Resources Information Center

    Smith, Julie M.; Edwards, Patrick M.; Raschke, Jason

    2006-01-01

    This paper presents the design, implementation and assessment of the Columbia River Basin Environmental Research Project (CERP) curriculum. CERP is an online inquiry-based, regional geographic curriculum designed to improve technology skills and content knowledge about water quality and watershed-level processes. Student attitudes and knowledge…

  3. Application of BIM technology in construction bidding

    NASA Astrophysics Data System (ADS)

    wei, Li

    2017-12-01

    bidding is a very important step of construction project. For the owners, bidding is the key link of selecting the best construction plan and saving the project cost to the maximum extent. For Construction Corporation, it is the key to show their construction technology which can improve the probability of winning the bid. this paper researches on the application of BIM technology in bidding process of construction project in detail, and discussesthe application of BIM technology in construction field comprehensively.

  4. A Science, Engineering and Technology (SET) Approach Improves Science Process Skills in 4-H Animal Science Participants

    ERIC Educational Resources Information Center

    Clarke, Katie C.

    2010-01-01

    A new Science, Engineering and Technology (SET) approach was designed for youth who participated in the Minnesota State Fair Livestock interview process. The project and evaluation were designed to determine if the new SET approach increased content knowledge and science process skills in participants. Results revealed that youth participants not…

  5. Assessing participatory practices in community-based natural resource management: experiences in community engagement from southern Africa.

    PubMed

    Dyer, J; Stringer, L C; Dougill, A J; Leventon, J; Nshimbi, M; Chama, F; Kafwifwi, A; Muledi, J I; Kaumbu, J-M K; Falcao, M; Muhorro, S; Munyemba, F; Kalaba, G M; Syampungani, S

    2014-05-01

    The emphasis on participatory environmental management within international development has started to overcome critiques of traditional exclusionary environmental policy, aligning with shifts towards decentralisation and community empowerment. However, questions are raised regarding the extent to which participation in project design and implementation is meaningful and really engages communities in the process. Calls have been made for further local-level (project and community-scale) research to identify practices that can increase the likelihood of meaningful community engagement within externally initiated projects. This paper presents data from three community-based natural resource management (CBNRM) project case studies from southern Africa, which promote Joint Forest Management (JFM), tree planting for carbon and conservation agriculture. Data collection was carried out through semi-structured interviews with key stakeholders, community-level meetings, focus groups and interviews. We find that an important first step for a meaningful community engagement process is to define 'community' in an open and participatory manner. Two-way communication at all stages of the community engagement process is shown to be critical, and charismatic leadership based on mutual respect and clarity of roles and responsibilities is vital to improve the likelihood of participants developing understanding of project aims and philosophy. This can lead to successful project outcomes through community ownership of the project goals and empowerment in project implementation. Specific engagement methods are found to be less important than the contextual and environmental factors associated with each project, but consideration should be given to identifying appropriate methods to ensure community representation. Our findings extend current thinking on the evaluation of participation by making explicit links between the community engagement process and project outcomes, and by identifying further criteria that can be considered in process and outcome-based evaluations. We highlight good practices for future CBNRM projects which can be used by project designers and initiators to further the likelihood of successful project outcomes. Copyright © 2014. Published by Elsevier Ltd.

  6. What do medical students understand by research and research skills? Identifying research opportunities within undergraduate projects.

    PubMed

    Murdoch-Eaton, Deborah; Drewery, Sarah; Elton, Sarah; Emmerson, Catherine; Marshall, Michelle; Smith, John A; Stark, Patsy; Whittle, Sue

    2010-01-01

    Undergraduate research exposure leads to increased recruitment into academic medicine, enhanced employability and improved postgraduate research productivity. Uptake of undergraduate research opportunities is reported to be disappointing, and little is known about how students perceive research. To investigate opportunities for undergraduate participation in research, recognition of such opportunities, and associated skills development. A mixed method approach, incorporating student focus and study groups, and documentary analysis at five UK medical schools. Undergraduates recognised the benefits of acquiring research skills, but identified practical difficulties and disadvantages of participating. Analysis of 905 projects in four main research skill areas - (1) research methods; (2) information gathering; (3) critical analysis and review; (4) data processing - indicated 52% of projects provided opportunities for students to develop one or more skills, only 13% offered development in all areas. In 17%, project descriptions provided insufficient information to determine opportunities. Supplied with information from a representative sample of projects (n = 80), there was little consensus in identifying skills among students or between students and researchers. Consensus improved dramatically following guidance on how to identify skills. Undergraduates recognise the benefits of research experience but need a realistic understanding of the research process. Opportunities for research skill development may not be obvious. Undergraduates require training to recognise the skills required for research and enhanced transparency in potential project outcomes.

  7. 77 FR 21157 - Internal Revenue Service; Open Meeting of the Taxpayer Advocacy Panel Refund Processing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-09

    ... public comments, ideas, and suggestions on improving customer service at the Internal Revenue Service... DEPARTMENT OF THE TREASURY Internal Revenue Service; Open Meeting of the Taxpayer Advocacy Panel Refund Processing Communications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury...

  8. Acoustic Signal Processing for Pipe Condition Assessment (WaterRF Report 4360)

    EPA Science Inventory

    Unique to prestressed concrete cylinder pipe (PCCP), individual wire breaks create an excitation in the pipe wall that may vary in response to the remaining compression of the pipe core. This project was designed to improve acoustic signal processing for pipe condition assessment...

  9. Energy conversion and storage program

    NASA Astrophysics Data System (ADS)

    Cairns, E. J.

    1992-03-01

    The Energy Conversion and Storage Program applies chemistry and materials science principles to solve problems in: (1) production of new synthetic fuels; (2) development of high-performance rechargeable batteries and fuel cells; (3) development of advanced thermochemical processes for energy conversion; (4) characterization of complex chemical processes; and (5) application of novel materials for energy conversion and transmission. Projects focus on transport-process principles, chemical kinetics, thermodynamics, separation processes, organic and physical chemistry, novel materials, and advanced methods of analysis. Electrochemistry research aims to develop advanced power systems for electric vehicle and stationary energy storage applications. Topics include identification of new electrochemical couples for advanced rechargeable batteries, improvements in battery and fuel-cell materials, and the establishment of engineering principles applicable to electrochemical energy storage and conversion. Chemical Applications research includes topics such as separations, catalysis, fuels, and chemical analyses. Included in this program area are projects to develop improved, energy-efficient methods for processing waste streams from synfuel plants and coal gasifiers. Other research projects seek to identify and characterize the constituents of liquid fuel-system streams and to devise energy-efficient means for their separation. Materials Applications research includes the evaluation of the properties of advanced materials, as well as the development of novel preparation techniques. For example, the use of advanced techniques, such as sputtering and laser ablation, are being used to produce high-temperature superconducting films.

  10. a New Protocol for Texture Mapping Process and 2d Representation of Rupestrian Architecture

    NASA Astrophysics Data System (ADS)

    Carnevali, L.; Carpiceci, M.; Angelini, A.

    2018-05-01

    The development of the survey techniques for architecture and archaeology requires a general review in the methods used for the representation of numerical data. The possibilities offered by data processing allow to find new paths for studying issues connected to the drawing discipline. The research project aimed at experimenting different approaches for the representation of the rupestrian architecture and the texture mapping process. The nature of the rupestrian architecture does not allow a traditional representation of sections and projections of edges and outlines. The paper presents a method, the Equidistant Multiple Sections (EMS), inspired by cartography and based on the use of isohipses generated from different geometric plane. A specific paragraph is dedicated to the texture mapping process for unstructured surface models. One of the main difficulty in the image projection consists in the recognition of homologous points between image and point cloud, above all in the areas with most deformations. With the aid of the "virtual scan" tool a different procedure was developed for improving the correspondences of the image. The result show a sensible improvement of the entire process above all for the architectural vaults. A detailed study concerned the unfolding of the straight line surfaces; the barrel vault of the analyzed chapel has been unfolded for observing the paintings in the real shapes out of the morphological context.

  11. New procedures of ergonomics design in a large oil company.

    PubMed

    Alhadeff, Cynthia Mossé; Silva, Rosana Fernandes da; Reis, Márcia Sales dos

    2012-01-01

    This study presents the challenge involved in the negotiation and construction of a standard process in a major petroleum company that has the purpose of guiding the implementation of ergonomic studies in the development of projects, systemising the implementation of ergonomics design. The standard was created by a multi-disciplinary working group consisting of specialists in ergonomics, who work in a number of different areas of the company. The objective was to guide "how to" undertake ergonomics in all projects, taking into consideration the development of the ergonomic appraisals of work. It also established that all the process, in each project phase, should be accompanied by a specialist in ergonomics. This process as an innovation in the conception of projects in this company, signals a change of culture, and, for this reason requires broad dissemination throughout the several company leadership levels, and training of professionals in projects of ergonomics design. An implementation plan was also prepared and approved by the corporate governance, complementing the proposed challenge. In this way, this major oil company will implement new procedures of ergonomics design to promote health, safety, and wellbeing of the workforce, besides improving the performance and reliability of its systems and processes.

  12. Ares Project Overview - Quality in Design

    NASA Technical Reports Server (NTRS)

    Cianciola, Chris; Crane, Kenneth

    2008-01-01

    This presentation introduces the audience to the overall goals of the Ares Project, which include providing human access to low-Earth orbit, the Moon, and beyond. The presentation also provides an overview of with the vehicles that will execute those goals and progress made on the vehicles to date. The briefing will provide an introduction to Lean, Six Sigma, and Kaizen practices Ares will use to improve the overall effectiveness and quality of its efforts. Finally, the briefing includes a summary of Safety and Mission Assurance practices being implemented within[Ares to ensure safety and quality early in the design process. Integrating Safety and Mission Assurance in Design: This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safer T and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

  13. Warpage improvement on wheel caster by optimizing the process parameters using genetic algorithm (GA)

    NASA Astrophysics Data System (ADS)

    Safuan, N. S.; Fathullah, M.; Shayfull, Z.; Nasir, S. M.; Hazwan, M. H. M.

    2017-09-01

    In injection moulding process, the defects will always encountered and affected the final product shape and functionality. This study is concerning on minimizing warpage and optimizing the process parameter of injection moulding part. Apart from eliminating product wastes, this project also giving out best recommended parameters setting. This research studied on five parameters. The optimization showed that warpage have been improved 42.64% from 0.6524 mm to 0.30879 mm in Autodesk Moldflow Insight (AMI) simulation result and Genetic Algorithm (GA) respectively.

  14. Evaluation and recommendations for work group integration within the Materials and Processes Lab

    NASA Technical Reports Server (NTRS)

    Farrington, Phillip A.

    1992-01-01

    The goal of this study was to evaluate and make recommendations for improving the level of integration of several work groups within the Materials and Processes Lab at the Marshall Space Flight Center. This evaluation has uncovered a variety of projects that could improve the efficiency and operation of the work groups as well as the overall integration of the system. In addition, this study provides the foundation for specification of a computer integrated manufacturing test bed environment in the Materials and Processes Lab.

  15. The Use of Journals To Improve Writing Skills in Commercial Spanish: State of a Research Project.

    ERIC Educational Resources Information Center

    Alvarez-Ruf, Hersilia

    Recent writing theory, research, and pedagogy have aided in the development of several models for improving second language writing skills. Attention is focused more on writing as a process, the importance of practice in writing improvement, and the need to learn cognitive structures contributing to writing. Daily journal writing is one method of…

  16. Enhancing Outcomes for Outpatient Percutaneous Coronary Interventions

    PubMed Central

    Spruce, Kevin; Butler, Chondra

    2017-01-01

    Purpose and Objectives: A quality improvement project was conducted to create a sustainable continuum of care for increased volumes of outpatients receiving percutaneous coronary interventions. Dramatic growth exposed system vulnerabilities and left staff overwhelmed. Four postinterventional project objectives included reducing preprocedural preparation times, reducing bleeding complications, reducing hospital length of stay, and collectively increasing patient satisfaction. Description of the Project: Amidst creating a specialized postintervention coronary recovery area and acquiring and training existing preregistration and recovery nurses, a fragmented system of care was united. The clinical nurse specialist–led project used a systematic and evidence-based implementation process to harmoniously acclimate perioperative staff. An evaluation process further defined new opportunities to support a growing service line. Outcomes: Postimplementation data were collected over a 3-month period. An overall improvement was found in all targeted objectives, despite an upsurge in case volumes. A moderately significant correlation (r [105] = 0.424, P < .001) was found between bleeding occurrences and hospital length of stay. Conclusion: The synergy between interdepartmental collaboration and strategic staffing reallocation was shown to be invaluable to alleviate procedural areas of service, such as the cardiac catheterization laboratory. As a project champion, the clinical nurse specialist is an essential catalyst to identify and creatively surmount system-level challenges. PMID:28991015

  17. Overcoming obstacles to implementation: addressing political, institutional and behavioral problems in earthquake hazard mitigation policies

    NASA Astrophysics Data System (ADS)

    Alesch, Daniel J.; Petak, William J.

    2002-06-01

    This project is aimed at bridging the three planes, from basic research, through enabling processes, to engineered systems. At the basic research plane, we have been working to improve our collective understanding about obstacles to implementing mitigation practices, owner decision processes (in connection with other MCEER projects), and public policy processes. At the level of enabling processes, we have been seeking to develop an understanding of how obstacles to greater mitigation can be overcome by improved policy design and processes. At the engineered systems plane, our work is intended to result in practical guidelines for devising policies and programs with appropriate motivation and incentives for implementing policies and programs once adopted. This phase of the research has been aimed, first, at a thorough, multidisciplinary review of the literature concerning obstacles to implementation. Second, the research has focused on advancing the state of the art by developing means for integrating the insights offered by diverse perspectives on the implementation process from the several social, behavioral, and decision sciences. The research establishes a basis for testing our understanding of these processes in the case of hospital retrofit decisions.

  18. Six Sigma arises from the ashes of TQM with a twist.

    PubMed

    Black, Ken; Revere, Lee

    2006-01-01

    This paper sets out to analyse the use of the Six Sigma methodology to improve quality in healthcare. It looks at how Six Sigma grew out of the concept of Total Quality Management (TQM). Six Sigma is a quality improvement methodology that has been widely adopted by companies since the early 1990s and has grown exponentially in the healthcare industry during the past five years. Some of the main tenets of Six Sigma have emerged from the principles of TQM, including the notion that the entire organization must support the quality effort; that there should be a vigorous education effort; and that a quality improvement process should emphasize root cause analysis. In spite of its early success, TQM "crashed and burned" for several reasons including the fact that financial benefits were difficult to assign to TQM efforts, root cause was not always determined resulting in recurring errors, there was no common metric to measure the level of quality attained, and quality efforts were sometimes aimed at processes or operations that were not critical to the customer. Six Sigma filled the vacuums created by these TQM failures in several ways. Under the Six Sigma methodology, quality improvement projects are carefully defined so that they can be successfully completed within a relatively short time frame. Financials are applied to each completed project so that management knows how much the project saves the institution. On each project, intense study is used to determine root cause analysis; and in the end, a metric known as "sigma level" can be assigned to signify the level of quality. Six Sigma has a "critical to quality" dimension that keeps the quality effort focused on improving only those things that really matter to the customer.

  19. Recent trends, drivers, and projections of carbon cycle processes in forests and grasslands of North America

    NASA Astrophysics Data System (ADS)

    Domke, G. M.; Williams, C. A.; Birdsey, R.; Pendall, E.

    2017-12-01

    In North America forest and grassland ecosystems play a major role in the carbon cycle. Here we present the latest trends and projections of United States and North American carbon cycle processes, stocks, and flows in the context of interactions with global scale budgets and climate change impacts in managed and unmanaged grassland and forest ecosystems. We describe recent trends in natural and anthropogenic disturbances in these ecosystems as well as the carbon dynamics associated with land use and land cover change. We also highlight carbon management science and tools for informing decisions and opportunities for improving carbon measurements, observations, and projections in forests and grasslands.

  20. Total Ore Processing Integration and Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leslie Gertsch; Richard Gertsch

    2006-01-30

    This report outlines the technical progress achieved for project DE-FC26-03NT41785 (Total Ore Processing Integration and Management) during the period 01 July through 30 September of 2005. This ninth quarterly report discusses the activities of the project team during the period 1 July through 30 September 2005. Richard Gertsch's unexpected death due to natural causes while in Minnesota to work on this project has temporarily slowed progress. Statistical analysis of the Minntac Mine data set for late 2004 is continuing. Preliminary results raised several questions that could be amenable to further study. Detailed geotechnical characterization is being applied to improve themore » predictability of mill and agglomerator performance at Hibtac Mine.« less

  1. [Improving inpatient pharmacoterapeutic process by Lean Six Sigma methodology].

    PubMed

    Font Noguera, I; Fernández Megía, M J; Ferrer Riquelme, A J; Balasch I Parisi, S; Edo Solsona, M D; Poveda Andres, J L

    2013-01-01

    Lean Six Sigma methodology has been used to improve care processes, eliminate waste, reduce costs, and increase patient satisfaction. To analyse the results obtained with Lean Six Sigma methodology in the diagnosis and improvement of the inpatient pharmacotherapy process during structural and organisational changes in a tertiary hospital. 1.000 beds tertiary hospital. prospective observational study. The define, measure, analyse, improve and control (DMAIC), were deployed from March to September 2011. An Initial Project Charter was updated as results were obtained. 131 patients with treatments prescribed within 24h after admission and with 4 drugs. safety indicators (medication errors), and efficiency indicators (complaints and time delays). Proportion of patients with a medication error was reduced from 61.0% (25/41 patients) to 55.7% (39/70 patients) in four months. Percentage of errors (regarding the opportunities for error) decreased in the different phases of the process: Prescription: from 5.1% (19/372 opportunities) to 3.3% (19/572 opportunities); Preparation: from 2.7% (14/525 opportunities) to 1.3% (11/847 opportunities); and administration: from 4.9% (16/329 opportunities) to 3.0% (13/433 opportunities). Nursing complaints decreased from 10.0% (2119/21038 patients) to 5.7% (1779/31097 patients). The estimated economic impact was 76,800 euros saved. An improvement in the pharmacotherapeutic process and a positive economic impact was observed, as well as enhancing patient safety and efficiency of the organization. Standardisation and professional training are future Lean Six Sigma candidate projects. Copyright © 2012 SECA. Published by Elsevier Espana. All rights reserved.

  2. Improving Life-Cycle Cost Management of Spacecraft Missions

    NASA Technical Reports Server (NTRS)

    Clardy, Dennon

    2010-01-01

    This presentation will explore the results of a recent NASA Life-Cycle Cost study and how project managers can use the findings and recommendations to improve planning and coordination early in the formulation cycle and avoid common pitfalls resulting in cost overruns. The typical NASA space science mission will exceed both the initial estimated and the confirmed life-cycle costs by the end of the mission. In a fixed-budget environment, these overruns translate to delays in starting or launching future missions, or in the worst case can lead to cancelled missions. Some of these overruns are due to issues outside the control of the project; others are due to the unpredictable problems (unknown unknowns) that can affect any development project. However, a recent study of life-cycle cost growth by the Discovery and New Frontiers Program Office identified a number of areas that are within the scope of project management to address. The study also found that the majority of the underlying causes for cost overruns are embedded in the project approach during the formulation and early design phases, but the actual impacts typically are not experienced until late in the project life cycle. Thus, project management focus in key areas such as integrated schedule development, management structure and contractor communications processes, heritage and technology assumptions, and operations planning, can be used to validate initial cost assumptions and set in place management processes to avoid the common pitfalls resulting in cost overruns.

  3. Comprehensive review of the evidence regarding the effectiveness of community-based primary health care in improving maternal, neonatal and child health: 5. equity effects for neonates and children.

    PubMed

    Schleiff, Meike; Kumapley, Richard; Freeman, Paul A; Gupta, Sundeep; Rassekh, Bahie M; Perry, Henry B

    2017-06-01

    The degree to which investments in health programs improve the health of the most disadvantaged segments of the population-where utilization of health services and health status is often the worst-is a growing concern throughout the world. Therefore, questions about the degree to which community-based primary health care (CBPHC) can or actually does improve utilization of health services and the health status of the most disadvantaged children in a population is an important one. Using a database containing information about the assessment of 548 interventions, projects or programs (referred to collectively as projects) that used CBPHC to improve child health, we extracted evidence related to equity from a sub-set of 42 projects, identified through a multi-step process, that included an equity analysis. We organized our findings conceptually around a logical framework matrix. Our analysis indicates that these CBPHC projects, all of which implemented child health interventions, achieved equitable effects. The vast majority (87%) of the 82 equity measurements carried out and reported for these 42 projects demonstrated "pro-equitable" or "equitable" effects, meaning that the project's equity indicator(s) improved to the same degree or more in the disadvantaged segments of the project population as in the more advantaged segments. Most (78%) of the all the measured equity effects were "pro-equitable," meaning that the equity criterion improved more in the most disadvantaged segment of the project population than in the other segments of the population. Based on the observation that CBPHC projects commonly provide services that are readily accessible to the entire project population and that even often reach down to all households, such projects are inherently likely to be more equitable than projects that strengthen services only at facilities, where utilization diminishes greatly with one's distance away. The decentralization of services and attention to and tracking of metrics across all phases of project implementation with attention to the underserved, as can be done in CBPHC projects, are important for reducing inequities in countries with a high burden of child mortality. Strengthening CBPHC is a necessary strategy for reducing inequities in child health and for achieving universal coverage of essential services for children.

  4. Development, implementation, and process evaluation of a regional palliative care quality improvement project.

    PubMed

    Dudgeon, Deborah J; Knott, Christine; Chapman, Cheryl; Coulson, Kathy; Jeffery, Elizabeth; Preston, Sharon; Eichholz, Mary; Van Dijk, Janice P; Smith, Anne

    2009-10-01

    The delivery of optimal palliative care requires an integrated and coordinated approach of many health care providers across the continuum of care. In response to identified gaps in the region, the Palliative Care Integration Project (PCIP) was developed to improve continuity and decrease variability of care to palliative patients with cancer. The infrastructure for the project included multi-institutional and multisectoral representation on the Steering Committee and on the Development, Implementation and Evaluation Working Groups. After review of the literature, five Collaborative Care Plans and Symptom Management Guidelines were developed and integrated with validated assessment tools (Edmonton Symptom Assessment System and Palliative Performance Scale). These project resources were implemented in the community, the palliative care unit, and the cancer center. Surveys were completed by frontline health professionals (defined as health professionals providing direct care), and two independent focus groups were conducted to capture information regarding: 1) the development of the project and 2) the processes of implementation and usefulness of the different components of the project. Over 90 individuals from more than 30 organizations were involved in the development, implementation, and evaluation of the PCIP. Approximately 600 regulated health professionals and allied health professionals who provided direct care, and over 200 family physicians and medical residents, received education/training on the use of the PCIP resources. Despite unanticipated challenges, frontline health professionals reported that the PCIP added value to their practice, particularly in the community sector. The PCIP showed that a network in which each organization had ownership and where no organization lost its autonomy, was an effective way to improve integration and coordination of care delivery.

  5. Building a generalized distributed system model

    NASA Technical Reports Server (NTRS)

    Mukkamala, R.

    1993-01-01

    The key elements in the 1992-93 period of the project are the following: (1) extensive use of the simulator to implement and test - concurrency control algorithms, interactive user interface, and replica control algorithms; and (2) investigations into the applicability of data and process replication in real-time systems. In the 1993-94 period of the project, we intend to accomplish the following: (1) concentrate on efforts to investigate the effects of data and process replication on hard and soft real-time systems - especially we will concentrate on the impact of semantic-based consistency control schemes on a distributed real-time system in terms of improved reliability, improved availability, better resource utilization, and reduced missed task deadlines; and (2) use the prototype to verify the theoretically predicted performance of locking protocols, etc.

  6. Introduction of a quality improvement curriculum in the Department of Internal Medicine, Lincoln Medical Center.

    PubMed

    Venugopal, Usha; Kasubhai, Moiz; Paruchuri, Vikram

    2017-01-01

    Community hospitals with limited resources struggle to engage physicians in Quality improvement initiatives. We introduced Quality Improvement (QI) curriculum for residents in response to ACGME requirements and surveyed the residents understanding of QI and their involvement in QI projects before and after the introduction of the curriculum. The current article describes our experiences with the process, the challenges and possible solutions to have a successful resident led QI initiative in a community hospital. Methods: A formal QI curriculum was introduced in the Department of Internal Medicine from September to October 2015 using the Model for Improvement from Institute for Health care Improvement (IHI). Learners were expected to read the online modules, discuss in small group sessions and later encouraged to draft their QI projects using the Charter form and PDSA form available on the HI website. Online surveys were conducted a week prior and 3 months after completion of the curriculum Results: 80% (100/117) of residents completed the pre-curriculum survey and 52% (61/117) completed the survey post curriculum. 96.7% of residents report that physicians should lead QI projects and training rather than the hospital administrators. Residents had 20% increase in understanding and confidence in leading quality improvement projects post curriculum once initiated. Most Residents (72%) feel QI should be taught during residency. Active involvement of residents with interest was seen after the initiation of Open School Institute of health improvement (IHI) curriculum as compared to Institutional led QI's. The resident interventions, pitfalls with change processes with an example of PDSA cycle are discussed. Conclusion: A Dedicated QI curriculum is necessary to prepare the physicians deliver quality care in an increasing complex health care delivery system. The strength of the curriculum is the ease of understanding the material, easily available to all, and can be easily replicated in a Community Hospital program with limited resources. Participation in QI by residents may promote constructive competitiveness among related hospitals in public system to improve delivery of safe care. Abbreviations: ACGME: Accreditation Council for Graduate Medical Education; IHI: Institute of Healthcare Improvement; PDSA: Plan-Do-Study-Act; PGY: QI: Quality improvement.

  7. Implementing clinical process management of vascular wounds in a tertiary facility: impact evaluation of a performance improvement project.

    PubMed

    Avruscio, Giampiero; Tocco-Tussardi, Ilaria; Bordignon, Greta; Vindigni, Vincenzo

    2017-01-01

    Chronic vascular wounds have a significant economic and social impact on our society calling for allocation of a great deal of attention and resources. Efforts should be oriented toward the achievement of the most effective and efficient clinical management. The Angiology Unit at the University Hospital of Padova, Italy, developed a performance improvement project to enhance the quality of practice for vascular ulcers. The project consisted in a multistep process comprising a critical revision of the previous clinical process management, staff education, tightening connections between operators and services, and creation of a position for a wound care nurse. The previous standard of practice was modified according to the results of revision and the current evidence-based practice. The new standard of practice reached its full application in September 2015. The number of patients treated and the number of visits in 2015 remained almost unvaried from 2014. However, the total annual expenditure for treating vascular ulcers was reduced by ~60% from the previous year. Standardization of guidelines and practice is effective in creating an efficient clinical management and in reducing the economic burden of vascular ulcers.

  8. Growing organizational capacity through a systems approach: one health network's experience.

    PubMed

    MacKenzie, Richard; Capuano, Terry; Durishin, Linda Drexinger; Stern, Glen; Burke, James B

    2008-02-01

    Hospitals are reporting unexpected surges in demand for services. Lehigh Valley Hospital challenged its clinical and administrative staff to increase capacity by at least 4% per year using an interdepartmental, systemwide initiative, Growing Organizational Capacity (GOC). Following a systemwide leadership retreat that yielded more than 1,000 ideas, the initiative's principal sponsor convened a cross-functional improvement team. During a two-year period, 17 projects were implemented. Using a complex systems approach, improvement ideas "emerged" from microsystems at the points of care. Through rigorous reporting and testing of process adaptations, need, data, and people drove innovation. Hundreds of multilevel clinical and administrative staff redesigned processes and roles to increase organizational capacity. Admissions rose by 6.1%, 5.5 %, 8.7%, 5.0%, and 3.8% in fiscal years 2003 through 2007, respectively. Process enhancements cost approximately $1 million, while increased revenues attributable to increased capacity totaled $2.5 million. Multiple, coordinated, and concurrent projects created a greater impact than that possible with a single project. GOC and its success, best explained in the context of complex adaptive systems and microsystem theories, are transferrable to throughput issues that challenge efficiency and effectiveness in other health care systems.

  9. Application of the enterprise management tools Lean Six Sigma and PMBOK in developing a program of research management.

    PubMed

    Hors, Cora; Goldberg, Anna Carla; Almeida, Ederson Haroldo Pereira de; Babio Júnior, Fernando Galan; Rizzo, Luiz Vicente

    2012-01-01

    Introduce a program for the management of scientific research in a General Hospital employing the business management tools Lean Six Sigma and PMBOK for project management in this area. The Lean Six Sigma methodology was used to improve the management of the institution's scientific research through a specific tool (DMAIC) for identification, implementation and posterior analysis based on PMBOK practices of the solutions found. We present our solutions for the management of institutional research projects at the Sociedade Beneficente Israelita Brasileira Albert Einstein. The solutions were classified into four headings: people, processes, systems and organizational culture. A preliminary analysis of these solutions showed them to be completely or partially compliant to the processes described in the PMBOK Guide. In this post facto study, we verified that the solutions drawn from a project using Lean Six Sigma methodology and based on PMBOK enabled the improvement of our processes dealing with the management of scientific research carried out in the institution and constitutes a model to contribute to the search of innovative science management solutions by other institutions dealing with scientific research in Brazil.

  10. Early‐Stage Capital Cost Estimation of Biorefinery Processes: A Comparative Study of Heuristic Techniques

    PubMed Central

    Couturier, Jean‐Luc; Kokossis, Antonis; Dubois, Jean‐Luc

    2016-01-01

    Abstract Biorefineries offer a promising alternative to fossil‐based processing industries and have undergone rapid development in recent years. Limited financial resources and stringent company budgets necessitate quick capital estimation of pioneering biorefinery projects at the early stages of their conception to screen process alternatives, decide on project viability, and allocate resources to the most promising cases. Biorefineries are capital‐intensive projects that involve state‐of‐the‐art technologies for which there is no prior experience or sufficient historical data. This work reviews existing rapid cost estimation practices, which can be used by researchers with no previous cost estimating experience. It also comprises a comparative study of six cost methods on three well‐documented biorefinery processes to evaluate their accuracy and precision. The results illustrate discrepancies among the methods because their extrapolation on biorefinery data often violates inherent assumptions. This study recommends the most appropriate rapid cost methods and urges the development of an improved early‐stage capital cost estimation tool suitable for biorefinery processes. PMID:27484398

  11. Combustion research for gas turbine engines

    NASA Technical Reports Server (NTRS)

    Mularz, E. J.; Claus, R. W.

    1985-01-01

    Research on combustion is being conducted at Lewis Research Center to provide improved analytical models of the complex flow and chemical reaction processes which occur in the combustor of gas turbine engines and other aeropropulsion systems. The objective of the research is to obtain a better understanding of the various physical processes that occur in the gas turbine combustor in order to develop models and numerical codes which can accurately describe these processes. Activities include in-house research projects, university grants, and industry contracts and are classified under the subject areas of advanced numerics, fuel sprays, fluid mixing, and radiation-chemistry. Results are high-lighted from several projects.

  12. Post-processing of multi-hydrologic model simulations for improved streamflow projections

    NASA Astrophysics Data System (ADS)

    khajehei, sepideh; Ahmadalipour, Ali; Moradkhani, Hamid

    2016-04-01

    Hydrologic model outputs are prone to bias and uncertainty due to knowledge deficiency in model and data. Uncertainty in hydroclimatic projections arises due to uncertainty in hydrologic model as well as the epistemic or aleatory uncertainties in GCM parameterization and development. This study is conducted to: 1) evaluate the recently developed multi-variate post-processing method for historical simulations and 2) assess the effect of post-processing on uncertainty and reliability of future streamflow projections in both high-flow and low-flow conditions. The first objective is performed for historical period of 1970-1999. Future streamflow projections are generated for 10 statistically downscaled GCMs from two widely used downscaling methods: Bias Corrected Statistically Downscaled (BCSD) and Multivariate Adaptive Constructed Analogs (MACA), over the period of 2010-2099 for two representative concentration pathways of RCP4.5 and RCP8.5. Three semi-distributed hydrologic models were employed and calibrated at 1/16 degree latitude-longitude resolution for over 100 points across the Columbia River Basin (CRB) in the pacific northwest USA. Streamflow outputs are post-processed through a Bayesian framework based on copula functions. The post-processing approach is relying on a transfer function developed based on bivariate joint distribution between the observation and simulation in historical period. Results show that application of post-processing technique leads to considerably higher accuracy in historical simulations and also reducing model uncertainty in future streamflow projections.

  13. An Analysis of Department of Energy Cost Proposal Process and Effectiveness

    DTIC Science & Technology

    2011-10-11

    processes to mitigate and manage risk , rather than derive upfront assessment and quantification of proposal risk (DoE, 2008a). The proposal...2. GM 2- Enhance the Federal Contract and Project Management Workforce Substantially Complete 3. GM 3 - Improve Project Risk Assessment ...proposal, contract proposal evaluation, risk , cost analysis = = ^Åèìáëáíáçå=oÉëÉ~êÅÜ=mêçÖê~ã= do^ar^qb=p`elli=lc=_rpfkbpp=C=mr_if`=mlif`v - ii

  14. Software quality: Process or people

    NASA Technical Reports Server (NTRS)

    Palmer, Regina; Labaugh, Modenna

    1993-01-01

    This paper will present data related to software development processes and personnel involvement from the perspective of software quality assurance. We examine eight years of data collected from six projects. Data collected varied by project but usually included defect and fault density with limited use of code metrics, schedule adherence, and budget growth information. The data are a blend of AFSCP 800-14 and suggested productivity measures in Software Metrics: A Practioner's Guide to Improved Product Development. A software quality assurance database tool, SQUID, was used to store and tabulate the data.

  15. Implications of recent EIA changes in Thailand

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tongcumpou, C.; Harvey, N.

    The practice of environmental impact assessment (EIA) was implemented in Thailand after the revision of the National Environmental Quality Act in 1978. This led to more than 3,000 EIA documents being prepared and officially submitted up to 1992. More recently, a new act, the Enhancement and Conservation of National Environmental Quality Act, was introduced in 1992. As a consequence, some aspects of environmental legislation have been improved including the EIA process, which is expected to be more effective under the new act. This article examines the development and implementation of the EIA process in Thailand and its effectiveness in themore » context of its performance as an environmental management tool. The strengths and weaknesses of the EIA process under the original act are analyzed and compared to the new act, using two case studies in order to gain an insight into the EIA system. The first is the Second Stage Expressway in Bangkok, and the second is the Pak Mun Hydroelectric Dam project in Ubon Rachathani, a northeastern province of Thailand. EIAs for these projects were originally submitted according to the requirements of the old act. Both are public projects that have aroused controversy for different environmental reasons, although final decisions have been made facilitating the implementation of these projects. Finally, the article presents some suggestions for improving the content and procedures for the EIA system in Thailand.« less

  16. Introducing quality improvement methods into local public health departments: structured evaluation of a statewide pilot project.

    PubMed

    Riley, William; Parsons, Helen; McCoy, Kim; Burns, Debra; Anderson, Donna; Lee, Suhna; Sainfort, François

    2009-10-01

    To test the feasibility and assess the preliminary impact of a unique statewide quality improvement (QI) training program designed for public health departments. One hundred and ninety-five public health employees/managers from 38 local health departments throughout Minnesota were selected to participate in a newly developed QI training program and 65 of those engaged in and completed eight expert-supported QI projects over a period of 10 months from June 2007 through March 2008. As part of the Minnesota Quality Improvement Initiative, a structured distance education QI training program was designed and deployed in a first large-scale pilot. To evaluate the preliminary impact of the program, a mixed-method evaluation design was used based on four dimensions: learner reaction, knowledge, intention to apply, and preliminary outcomes. Subjective ratings of three dimensions of training quality were collected from participants after each of the scheduled learning sessions. Pre- and post-QI project surveys were administered to collect participant reactions, knowledge, future intention to apply learning, and perceived outcomes. Monthly and final QI project reports were collected to further inform success and preliminary outcomes of the projects. The participants reported (1) high levels of satisfaction with the training sessions, (2) increased perception of the relevance of the QI techniques, (3) increased perceived knowledge of all specific QI methods and techniques, (4) increased confidence in applying QI techniques on future projects, (5) increased intention to apply techniques on future QI projects, and (6) high perceived success of, and satisfaction with, the projects. Finally, preliminary outcomes data show moderate to large improvements in quality and/or efficiency for six out of eight projects. QI methods and techniques can be successfully implemented in local public health agencies on a statewide basis using the collaborative model through distance training and expert facilitation. This unique training can improve both core and support processes and lead to favorable staff reactions, increased knowledge, and improved health outcomes. The program can be further improved and deployed and holds great promise to facilitate the successful dissemination of proven QI methods throughout local public health departments.

  17. The Springfield Weed and Seed Initiative: A Process Description and Evaluation.

    ERIC Educational Resources Information Center

    Hanna, Donald G.

    A process description and preliminary evaluation are provided for the Weed and Seed initiative in Springfield (Illinois). This initiative involved local, state, and federal resources in projects that included (1) facility improvement, (2) drug prevention, (3) youth education and child care, (4) jobs and vocational training, (5) resident…

  18. How to make negotiation work

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Willms, J.R.

    The siting of MSW facilities often generates controversy. Environmental negotiation can be a useful method for defusing controversy while allowing community leaders to maintain control of a proposed project. The environmental hearing process is described. The paper than discusses advantages and disadvantages in the context of MSW management and improving the hearing process.

  19. Student-Teacher Linkage Verification: Model Process and Recommendations

    ERIC Educational Resources Information Center

    Watson, Jeffery; Graham, Matthew; Thorn, Christopher A.

    2012-01-01

    As momentum grows for tracking the role of individual educators in student performance, school districts across the country are implementing projects that involve linking teachers to their students. Programs that link teachers to student outcomes require a verification process for student-teacher linkages. Linkage verification improves accuracy by…

  20. Understanding Acceptance of Software Metrics--A Developer Perspective

    ERIC Educational Resources Information Center

    Umarji, Medha

    2009-01-01

    Software metrics are measures of software products and processes. Metrics are widely used by software organizations to help manage projects, improve product quality and increase efficiency of the software development process. However, metrics programs tend to have a high failure rate in organizations, and developer pushback is one of the sources…

  1. The Contributions of Bernstein's Sociology to Education Development Research

    ERIC Educational Resources Information Center

    Sriprakash, Arathi

    2011-01-01

    Global and national agendas to improve the "quality" of Education For All have brought focus to pedagogic processes in developing country contexts. How can development research pay attention to the social and political significance of pedagogical projects and understand the micro-processes of classroom reform? This paper considers how…

  2. The communication in industrialised building system (IBS) construction project: Virtual environment

    NASA Astrophysics Data System (ADS)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cort, K. A.; Hostick, D. J.; Belzer, D. B.

    The purpose of the project was to identify and characterize the modeling of deployment programs within the EERE Technology Development (TD) programs, address possible improvements to the modeling process, and note gaps in knowledge for future research.

  4. The End-to-end Demonstrator for improved decision making in the water sector in Europe (EDgE)

    NASA Astrophysics Data System (ADS)

    Wood, Eric; Wanders, Niko; Pan, Ming; Sheffield, Justin; Samaniego, Luis; Thober, Stephan; Kumar, Rohinni; Prudhomme, Christel; Houghton-Carr, Helen

    2017-04-01

    High-resolution simulations of water resources from hydrological models are vital to supporting important climate services. Apart from a high level of detail, both spatially and temporally, it is important to provide simulations that consistently cover a range of timescales, from historical reanalysis to seasonal forecast and future projections. In the new EDgE project commissioned by the ECMWF (C3S) we try to fulfill these requirements. EDgE is a proof-of-concept project which combines climate data and state-of-the-art hydrological modelling to demonstrate a water-oriented information system implemented through a web application. EDgE is working with key European stakeholders representative of private and public sectors to jointly develop and tailor approaches and techniques. With these tools, stakeholders are assisted in using improved climate information in decision-making, and supported in the development of climate change adaptation and mitigation policies. Here, we present the first results of the EDgE modelling chain, which is divided into three main processes: 1) pre-processing and downscaling; 2) hydrological modelling; 3) post-processing. Consistent downscaling and bias corrections for historical simulations, seasonal forecasts and climate projections ensure that the results across scales are robust. The daily temporal resolution and 5km spatial resolution ensure locally relevant simulations. With the use of four hydrological models (PCR-GLOBWB, VIC, mHM, Noah-MP), uncertainty between models is properly addressed, while consistency is guaranteed by using identical input data for static land surface parameterizations. The forecast results are communicated to stakeholders via Sectoral Climate Impact Indicators (SCIIs) that have been created in collaboration with the end-user community of the EDgE project. The final product of this project is composed of 15 years of seasonal forecast and 10 climate change projections, all combined with four hydrological models. These unique high-resolution climate information simulations in the EDgE project provide an unprecedented information system for decision-making over Europe.

  5. Open the `black box' creativity and innovation: a study of activities in R&D departments. Some prospects for engineering education

    NASA Astrophysics Data System (ADS)

    Millet, Charlyne; Oget, David; Cavallucci, Denis

    2017-11-01

    Innovation is a key component to the success and longevity of companies. Our research opens the 'black box' of creativity and innovation in R&D teams. We argue that understanding the nature of R&D projects in terms of creativity/innovation, efficiency/inefficiency, is important for designing education policies and improving engineering curriculum. Our research addresses the inventive design process, a lesser known aspect of the innovation process, in 197 R&D departments of industrial sector companies in France. One fundamental issue facing companies is to evaluate processes and results of innovation. Results show that the evaluation of innovation is confined by a lack of methodology of inventive projects. We will be establishing the foundations of a formal ontology for inventive design projects and finally some recommendations for engineering education.

  6. Developing Student Voice and Participatory Pedagogy: A Case Study in a Spanish Primary School

    ERIC Educational Resources Information Center

    Susinos, Teresa; Haya, Ignacio

    2014-01-01

    This article describes a case study that is part of a broader research project in which schools set up processes of school improvement inspired by the proposals put forward by students. The project furthers the initiatives of the student voice movement and seeks to implement more participative pedagogical models. This as a whole represents a novel…

  7. Opening the Doors of Your Community. Pennsylvania Youth in Action. Project 2--Member Guide.

    ERIC Educational Resources Information Center

    Pennsylvania State Univ., University Park. Dept. of Agricultural and Extension Education.

    This student workbook is for 12- to 14-year-olds participating in the Pennsylvania 4-H "Opening the Doors of Your Community" project which is designed to involve youth in improving the quality of community life, learning about the role and functions of local government, understanding public issues, becoming involved in the process of…

  8. Development and implementation of a residency project advisory board.

    PubMed

    Dagam, Julie K; Iglar, Arlene; Kindsfater, Julie; Loeb, Al; Smith, Chad; Spexarth, Frank; Brierton, Dennis; Woller, Thomas

    2017-06-15

    The development and implementation of a residency project advisory board (RPAB) to manage multiple pharmacy residents' yearlong projects across several residency programs are described. Preceptor and resident feedback during our annual residency program review and strategic planning sessions suggested the implementation of a more-coordinated approach to the identification, selection, and oversight of all components of the residency project process. A panel of 7 department leaders actively engaged in residency training and performance improvement was formed to evaluate the residency project process and provide recommendations for change. These 7 individuals would eventually constitute the RPAB. The primary objective of the RPAB at Aurora Health Care is to provide oversight and a structured framework for the selection and execution of multiple residents' yearlong projects across all residency programs within our organization. Key roles of the RPAB include developing expectations, coordinating residency project ideas, and providing oversight and feedback. The development and implementation of the RPAB resulted in a significant overhaul of our entire yearlong resident project process. Trends toward success were realized after the first year of implementation, including consistent expectations, increased clarity and engagement in resident project ideas, and more projects meeting anticipated endpoints. The development and implementation of an RPAB have provided a framework to optimize the organization, progression, and outcomes of multiple pharmacy resident yearlong projects in all residency programs across our pharmacy enterprise. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  9. Managing large energy and mineral resources (EMR) projects in challenging environments

    NASA Astrophysics Data System (ADS)

    Chanmeka, Arpamart

    The viability of energy mineral resources (EMR) construction projects is contingent upon the state of the world economic climate. Oil sands projects in Alberta, Canada exemplify large EMR projects that are highly sensitive to fluctuations in the world market. Alberta EMR projects are constrained by high fixed production costs and are also widely recognized as one of the most challenging construction projects to successfully deliver due to impacts from extreme weather conditions, remote locations and issues with labor availability amongst others. As indicated in many studies, these hardships strain the industry's ability to execute work efficiently, resulting in declining productivity and mounting cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta EMR projects, project teams are targeting effective management strategies to enhance project performance and productivity by countering the uniquely challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking tailored to the specific constraints and challenges of Alberta. Results support quantitative assessments and identify the root causes of project performance and ineffective field productivity problems in the heavy industry sector capital projects. Customized metrics produced from the data collected through a web-based survey instrument were used to quantitatively assess project performance in the following dimensions: cost, schedule, change, rework, safety, engineering and construction productivity and construction practices. The system enables the industry to measure project performance more accurately, get meaningful comparisons, while establishing credible norms specific to Alberta projects. Data analysis to identify the root cause of performance problems was conducted. The analysis of Alberta projects substantiated lessons of previous studies to create an improved awareness of the abilities of Alberta-based companies to manage their unique projects. This investigation also compared Alberta-based projects with U.S. projects to point out the differences in project process and management strategies under different environments. The relative impact of factors affecting construction productivity were identified and validated by the input from industry experts. The findings help improve the work processes used by companies developing projects in Alberta.

  10. Using Ecosystem Experiments to Improve Vegetation Models

    DOE PAGES

    Medlyn, Belinda; Zaehle, S; DeKauwe, Martin G.; ...

    2015-05-21

    Ecosystem responses to rising CO2 concentrations are a major source of uncertainty in climate change projections. Data from ecosystem-scale Free-Air CO2 Enrichment (FACE) experiments provide a unique opportunity to reduce this uncertainty. The recent FACE Model–Data Synthesis project aimed to use the information gathered in two forest FACE experiments to assess and improve land ecosystem models. A new 'assumption-centred' model intercomparison approach was used, in which participating models were evaluated against experimental data based on the ways in which they represent key ecological processes. Identifying and evaluating the main assumptions caused differences among models, and the assumption-centered approach produced amore » clear roadmap for reducing model uncertainty. We explain this approach and summarize the resulting research agenda. We encourage the application of this approach in other model intercomparison projects to fundamentally improve predictive understanding of the Earth system.« less

  11. A case study detailing key considerations for implementing a telehealth approach to office ergonomics.

    PubMed

    Ritchie, Catherine L W; Miller, Linda L; Antle, David M

    2017-01-01

    Telehealth approaches to delivering ergonomics assessment hold great potential to improve service delivery in rural and remote settings. This case study describes a telehealth-based ergonomics service delivery process, and compares in-person and telehealth-based ergonomics approaches at an Alberta-based non-profit advocacy group. This project demonstrates that telehealth approaches to ergonomics do not lead to significantly different scoring outcomes for assessment of ergonomics issues, when compared to in-person assessments. This project also outlines the importance of live real-time video conferencing to improving communication, attaining key assessment information, and demonstrating ergonomic adjustments. However, some key considerations of bandwidth and hardware capabilities need to be taken into account. Key communication strategies are outlined to improve rapport, maintain employee confidentiality, and reduce client anxiety around telehealth ergonomics assessments. This project provides further support for telehealth approaches to office ergonomics, and outlines some key implementation strategies and barriers that should be considered.

  12. Quality improvement through implementation of discharge order reconciliation.

    PubMed

    Lu, Yun; Clifford, Pamela; Bjorneby, Andreas; Thompson, Bruce; VanNorman, Samuel; Won, Katie; Larsen, Kevin

    2013-05-01

    A coordinated multidisciplinary process to reduce medication errors related to patient discharges to skilled-nursing facilities (SNFs) is described. After determining that medication errors were a frequent cause of readmission among patients discharged to SNFs, a medical center launched a two-phase quality-improvement project focused on cardiac and medical patients. Phase one of the project entailed a three-month failure modes and effects analysis of existing procedures discharge, followed by the development and pilot testing of a multidisciplinary, closed-loop workflow process involving staff and resident physicians, clinical nurse coordinators, and clinical pharmacists. During pilot testing of the new workflow process, the rate of discharge medication errors involving SNF patients was tracked, and data on medication-related readmissions in a designated intervention group (n = 87) and a control group of patients (n = 1893) discharged to SNFs via standard procedures during a nine-month period were collected, with the data stratified using severity of illness (SOI) classification. Analysis of the collected data indicated a cumulative 30-day medication-related readmission rate for study group patients in the minor, moderate, and major SOI categories of 5.4% (4 of 74 patients), compared with a rate of 9.5% (169 of 1780 patients) in the control group. In phase 2 of the project, the revised SNF discharge medication reconciliation procedure was implemented throughout the hospital; since hospitalwide implementation of the new workflow, the readmission rate for SNF patients has been maintained at about 6.7%. Implementing a standardized discharge order reconciliation process that includes pharmacists led to decreased readmission rates and improved care for patients discharged to SNFs.

  13. Comprehensive review of the evidence regarding the effectiveness of community–based primary health care in improving maternal, neonatal and child health: 5. equity effects for neonates and children

    PubMed Central

    Schleiff, Meike; Kumapley, Richard; Freeman, Paul A; Gupta, Sundeep; Rassekh, Bahie M; Perry, Henry B

    2017-01-01

    Background The degree to which investments in health programs improve the health of the most disadvantaged segments of the population—where utilization of health services and health status is often the worst—is a growing concern throughout the world. Therefore, questions about the degree to which community–based primary health care (CBPHC) can or actually does improve utilization of health services and the health status of the most disadvantaged children in a population is an important one. Methods Using a database containing information about the assessment of 548 interventions, projects or programs (referred to collectively as projects) that used CBPHC to improve child health, we extracted evidence related to equity from a sub–set of 42 projects, identified through a multi–step process, that included an equity analysis. We organized our findings conceptually around a logical framework matrix. Results Our analysis indicates that these CBPHC projects, all of which implemented child health interventions, achieved equitable effects. The vast majority (87%) of the 82 equity measurements carried out and reported for these 42 projects demonstrated “pro–equitable” or “equitable” effects, meaning that the project’s equity indicator(s) improved to the same degree or more in the disadvantaged segments of the project population as in the more advantaged segments. Most (78%) of the all the measured equity effects were “pro–equitable,” meaning that the equity criterion improved more in the most disadvantaged segment of the project population than in the other segments of the population. Conclusions Based on the observation that CBPHC projects commonly provide services that are readily accessible to the entire project population and that even often reach down to all households, such projects are inherently likely to be more equitable than projects that strengthen services only at facilities, where utilization diminishes greatly with one’s distance away. The decentralization of services and attention to and tracking of metrics across all phases of project implementation with attention to the underserved, as can be done in CBPHC projects, are important for reducing inequities in countries with a high burden of child mortality. Strengthening CBPHC is a necessary strategy for reducing inequities in child health and for achieving universal coverage of essential services for children. PMID:28685043

  14. Changing the world: the design and implementation of comprehensive continuous integrated systems of care for individuals with co-occurring disorders.

    PubMed

    Minkoff, Kenneth; Cline, Christie A

    2004-12-01

    This article has described the CCISC model and the process of implementation of systemic implementation of co-occurring disorder services enhancements within the context of existing resources. Four projects were described as illustrations of current implementation activities. Clearly, there is need for improved services for these individuals, and increasing recognition of the need for systemic change models that are effective and efficient. The CCISC model has been recognized by SAMHSA as a consensus best practice for system design, and initial efforts at implementation appear to be promising. The existing toolkit may permit a more formal process of data-driven evaluation of system, program, clinician, and client outcomes, to better measure the effectiveness of this approach. Some projects have begun such formal evaluation processes, but more work is needed, not only with individual projects, but also to develop opportunities for multi-system evaluation, as more projects come on line.

  15. Articulating current service development practices: a qualitative analysis of eleven mental health projects

    PubMed Central

    2014-01-01

    Background The utilisation of good design practices in the development of complex health services is essential to improving quality. Healthcare organisations, however, are often seriously out of step with modern design thinking and practice. As a starting point to encourage the uptake of good design practices, it is important to understand the context of their intended use. This study aims to do that by articulating current health service development practices. Methods Eleven service development projects carried out in a large mental health service were investigated through in-depth interviews with six operation managers. The critical decision method in conjunction with diagrammatic elicitation was used to capture descriptions of these projects. Stage-gate design models were then formed to visually articulate, classify and characterise different service development practices. Results Projects were grouped into three categories according to design process patterns: new service introduction and service integration; service improvement; service closure. Three common design stages: problem exploration, idea generation and solution evaluation - were then compared across the design process patterns. Consistent across projects were a top-down, policy-driven approach to exploration, underexploited idea generation and implementation-based evaluation. Conclusions This study provides insight into where and how good design practices can contribute to the improvement of current service development practices. Specifically, the following suggestions for future service development practices are made: genuine user needs analysis for exploration; divergent thinking and innovative culture for idea generation; and fail-safe evaluation prior to implementation. Better training for managers through partnership working with design experts and researchers could be beneficial. PMID:24438471

  16. Articulating current service development practices: a qualitative analysis of eleven mental health projects.

    PubMed

    Jun, Gyuchan Thomas; Morrison, Cecily; Clarkson, P John

    2014-01-17

    The utilisation of good design practices in the development of complex health services is essential to improving quality. Healthcare organisations, however, are often seriously out of step with modern design thinking and practice. As a starting point to encourage the uptake of good design practices, it is important to understand the context of their intended use. This study aims to do that by articulating current health service development practices. Eleven service development projects carried out in a large mental health service were investigated through in-depth interviews with six operation managers. The critical decision method in conjunction with diagrammatic elicitation was used to capture descriptions of these projects. Stage-gate design models were then formed to visually articulate, classify and characterise different service development practices. Projects were grouped into three categories according to design process patterns: new service introduction and service integration; service improvement; service closure. Three common design stages: problem exploration, idea generation and solution evaluation - were then compared across the design process patterns. Consistent across projects were a top-down, policy-driven approach to exploration, underexploited idea generation and implementation-based evaluation. This study provides insight into where and how good design practices can contribute to the improvement of current service development practices. Specifically, the following suggestions for future service development practices are made: genuine user needs analysis for exploration; divergent thinking and innovative culture for idea generation; and fail-safe evaluation prior to implementation. Better training for managers through partnership working with design experts and researchers could be beneficial.

  17. The American Board of Radiology Perspective on Maintenance of Certification: Part IV: Practice quality improvement in radiologic physics.

    PubMed

    Frey, G Donald; Ibbott, Geoffrey S; Morin, Richard L; Paliwal, Bhudatt R; Thomas, Stephen R; Bosma, Jennifer

    2007-11-01

    Recent initiatives of the American Board of Medical Specialties (ABMS) in the area of maintenance of certification (MOC) have been reflective of the response of the medical community to address public concerns regarding quality of care, medical error reduction, and patient safety. In March 2000, the 24 member boards of the ABMS representing all medical subspecialties in the USA agreed to initiate specialty-specific maintenance of certification (MOC) programs. The American Board of Radiology (ABR) MOC program for diagnostic radiology, radiation oncology, and radiologic physics has been developed, approved by the ABMS, and initiated with full implementation for all three disciplines beginning in 2007. The overriding objective of MOC is to improve the quality of health care through diplomate-initiated learning and quality improvement. The four component parts to the MOC process are: Part I: Professional standing, Part II: Evidence of life long learning and periodic self-assessment, Part III: Cognitive expertise, and Part IV: Evaluation of performance in practice (with the latter being the focus of this paper). The key components of Part IV require a physicist-based response to demonstrate commitment to practice quality improvement (PQI) and progress in continuing individual competence in practice. Diplomates of radiologic physics must select a project to be completed over the ten-year cycle that potentially can improve the quality of the diplomate's individual or systems practice and enhance the quality of care. Five categories have been created from which an individual radiologic physics diplomate can select one required PQI project: (1) Safety for patients, employees, and the public, (2) accuracy of analyses and calculations, (3) report turnaround time and communication issues, (4) practice guidelines and technical standards, and (5) surveys (including peer review of self-assessment reports). Each diplomate may select a project appropriate for an individual, participate in a project within a clinical department, participate in a peer review of a self-assessment report, or choose a qualified national project sponsored by a society. Once a project has been selected, the steps are: (1) Collect baseline data relevant to the chosen project, (2) review and analyze the data, (3) create and implement an improvement plan, (4) remeasure and track, and (5) report participation to the ABR, using the template provided by the ABR. These steps begin in Year 2, following training in Year 1. Specific examples of individual PQI projects for each of the three disciplines of radiologic physics are provided. Now, through the MOC programs, the relationship between the radiologic physicist and the ABR will be continuous through the diplomate's professional career. The ABR is committed to providing an effective infrastructure that will promote and assist the process of continuing professional development including the enhancement of practice quality improvement for radiologic physicists.

  18. Productivity enhancement planning using participative management concepts

    NASA Technical Reports Server (NTRS)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dehoff, Ryan R.; List, III, Frederick Alyious; Carver, Keith

    ORNL Manufacturing Demonstration Facility worked with ECM Technologies LLC to investigate the use of precision electro-chemical machining technology to polish the surface of parts created by Arcam electron beam melting. The goals for phase one of this project have been met. The project goal was to determine whether electro-chemical machining is a viable method to improve the surface finish of Inconel 718 parts fabricated using the Arcam EBM method. The project partner (ECM) demonstrated viability for parts of both simple and complex geometry. During the course of the project, detailed process knowledge was generated. This project has resulted in themore » expansion of United States operations for ECM Technologies.« less

  20. Taking a unified approach to teaching and implementing quality improvements across multiple residency programs: the Atlantic Health experience.

    PubMed

    Daniel, Donna M; Casey, Donald E; Levine, Jeffrey L; Kaye, Susan T; Dardik, Raquel B; Varkey, Prathibha; Pierce-Boggs, Kimberly

    2009-12-01

    The Accreditation Council for Graduate Medical Education recently emphasized the importance of systems-based practice and systems-based learning; however, successful models of collaborative quality improvement (QI) initiatives in residency training curricula are not widely available. Atlantic Health successfully conceptualized and implemented a QI collaborative focused on medication safety across eight residency training programs representing 219 residents. During a six-month period, key faculty and resident leaders from 8 (of 10) Atlantic Health residency training programs participated in three half-day collaborative learning sessions focused on improving medication reconciliation. Each session included didactic presentations from a multidisciplinary team of clinical experts as well as the application of principles that identified challenges, barriers, and solutions to QI initiatives. The learning sessions emphasized the fundamental principles of medication reconciliation, its critical importance as a vital part of patient handoff in all health care settings, and the challenges of achieving successful medication reconciliation improvement in light of work hours restrictions and patient loads. Each residency program developed a detailed implementation and measurement plan for individual "action learning" projects, using the Plan-Do-Study-Act method of improvement. Each program then implemented its QI project, and expert faculty (e.g., physicians, nurses, pharmacists, QI staff) provided mentoring between learning sessions. Several projects resulted in permanent changes in medication reconciliation processes, which were then adopted by other programs. The structure, process, and outcomes of this effort are described in detail.

  1. Alternative contracting research : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    Alternative contracting methods have become popular alternatives to the traditional practice whose emphasis is on low bid acquisition. The benefits of decreased project schedule, increased job quality, and improved delivery process have demonstrated ...

  2. Implementing an interprofessional first-year teamwork project: some key reflections.

    PubMed

    McNaughton, Susan Maree

    2013-09-01

    Implementing an interprofessional teamwork project for first-year students presents pedagogical and practical challenges. While transferable skills and attributes are important, engagement of students with limited professional experience in teamwork depends on relevance to current learning needs. This report outlines principles learned from planning and implementing a teamwork project for an interprofessional health administration and service development course. Practising interprofessional teamwork as leaders and teachers, aligning with previous, current and future teamwork content and processes and responding to student feedback and achievement have been the key factors in shaping the project over three semesters. Face-to-face and online interprofessional teamwork learning has necessitated developing resources that support self-direction, using familiar technology and providing enabling physical environments. Implications for first-year interprofessional teamwork are that structured well-resourced processes, responsiveness and alignment of learning all improve student outcomes.

  3. Study of the 5E Instructional Model to Improve the Instructional Design Process of Novice Teachers

    ERIC Educational Resources Information Center

    Hu, Jiuhua; Gao, Chong; Liu, Yang

    2017-01-01

    This study investigated the effects of 5E instructional model on the teaching processes of novice teachers. First, we conducted a teaching design training project based on the 5E model for 40 novice teachers, and compared pre-texts of the teachers' teaching process from before the training with post-texts obtained immediately following the…

  4. Improving the representation of photosynthesis in Earth system models

    NASA Astrophysics Data System (ADS)

    Rogers, A.; Medlyn, B. E.; Dukes, J.; Bonan, G. B.; von Caemmerer, S.; Dietze, M.; Kattge, J.; Leakey, A. D.; Mercado, L. M.; Niinemets, U.; Prentice, I. C. C.; Serbin, S.; Sitch, S.; Way, D. A.; Zaehle, S.

    2015-12-01

    Continued use of fossil fuel drives an accelerating increase in atmospheric CO2 concentration ([CO2]) and is the principal cause of global climate change. Many of the observed and projected impacts of rising [CO2] portend increasing environmental and economic risk, yet the uncertainty surrounding the projection of our future climate by Earth System Models (ESMs) is unacceptably high. Improving confidence in our estimation of future [CO2] is essential if we seek to project global change with greater confidence. There are critical uncertainties over the long term response of terrestrial CO2 uptake to global change, more specifically, over the size of the terrestrial carbon sink and over its sensitivity to rising [CO2] and temperature. Reducing the uncertainty associated with model representation of the largest CO2 flux on the planet is therefore an essential part of improving confidence in projections of global change. Here we have examined model representation of photosynthesis in seven process models including several global models that underlie the representation of photosynthesis in the land surface model component of ESMs that were part of the recent Fifth Assessment Report from the IPCC. Our approach was to focus on how physiological responses are represented by these models, and to better understand how structural and parametric differences drive variation in model responses to light, CO2, nutrients, temperature, vapor pressure deficit and soil moisture. We challenged each model to produce leaf and canopy responses to these factors to help us identify areas in which current process knowledge and emerging data sets could be used to improve model skill, and also identify knowledge gaps in current understanding that directly impact model outputs. We hope this work will provide a roadmap for the scientific activity that is necessary to advance process representation, parameterization and scaling of photosynthesis in the next generation of Earth System Models.

  5. Develop Improved Materials to Support the Hydrogen Economy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dr. Michael C. Martin

    The Edison Materials Technology Center (EMTEC) solicited and funded hydrogen infrastructure related projects that have a near term potential for commercialization. The subject technology of each project is related to the US Department of Energy hydrogen economy goals as outlined in the multi-year plan titled, 'Hydrogen, Fuel Cells and Infrastructure Technologies Program Multi-Year Research, Development and Demonstration Plan.' Preference was given to cross cutting materials development projects that might lead to the establishment of manufacturing capability and job creation. The Edison Materials Technology Center (EMTEC) used the US Department of Energy hydrogen economy goals to find and fund projects withmore » near term commercialization potential. An RFP process aligned with this plan required performance based objectives with go/no-go technology based milestones. Protocols established for this program consisted of a RFP solicitation process, white papers and proposals with peer technology and commercialization review (including DoE), EMTEC project negotiation and definition and DoE cost share approval. Our RFP approach specified proposals/projects for hydrogen production, hydrogen storage or hydrogen infrastructure processing which may include sensor, separator, compression, maintenance, or delivery technologies. EMTEC was especially alert for projects in the appropriate subject area that have cross cutting materials technology with near term manufacturing and commercialization opportunities.« less

  6. Assessing and Improving Student Organizations: Resources for Facilitators CD-ROM. The Assessing and Improving Student Organization (AISO) Program

    ERIC Educational Resources Information Center

    Nolfi, Tricia; Ruben, Brent D.

    2010-01-01

    This companion to the "Guide for Students" and "Student Workbook" includes the complete set of PowerPoint slides, a PDF of the Facilitator's Guide in PPT (PowerPoint) slide show format, and PDFs of all scoring sheets, handouts and project planning guides needed for the AISO (Assessing and Improving Student Organization) process. The Assessing and…

  7. Manufacturing Improvement Program for the Oil and Gas Industry Supply Chain and Marketing Cluster

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, Robert

    This project supported upgrades for manufacturing companies in the oil and natural gas supply chain in Oklahoma. The goal is to provide assistance that will lead to the improved efficiency advancement of the manufacturing processes currently used by the existing manufacturing clients. The basis for the work is to improve the economic environment for the clients and the communities they serve.

  8. Assessment Practices for Advancing Transfer Student Success: Collaborating for Educational Change

    ERIC Educational Resources Information Center

    Brown, Gary R.; Rhodes, Terrel L.

    2016-01-01

    America's institutions of higher education have been challenged to develop new strategies to improve the success of all students. With more and more students attending multiple institutions, improving the transfer process is key to ensuring all students succeed. AAC&U launched the Quality Collaboratives (QC) project in 2011 with support from…

  9. A Study of Leadership and Continuous Improvement at Leadership Preparatory Academy

    ERIC Educational Resources Information Center

    Medina Araujo, Jacqueline

    2013-01-01

    This capstone project examines how an elementary school principal and her leadership team transformed Leadership Prep Academy in Capital City into a collaborative, high performing community school. This five-year process of continuous improvement involved engaging students, staff, parents, and members of the community in developing a culture of…

  10. ['Clinical auditing', a novel tool for quality assessment in surgical oncology].

    PubMed

    van Leersum, Nicoline J; Kolfschoten, Nikki E; Klinkenbijl, Jean H G; Tollenaar, Rob A E M; Wouters, Michel W J M

    2011-01-01

    To determine whether systematic audit and feedback of information about the process and outcomes improve the quality of surgical care. Systematic literature review. Embase, PubMed, and Web of Science databases were searched for publications on 'quality assessment' and 'surgery'. The references of the publications found were examined as well. Publications were included in the review if the effect of auditing on the quality of surgical care had been investigated. In the databases 2415 publications were found. After selection, 28 publications describing the effect of auditing, whether or not combined with a quality improvement project, on guideline adherence or indications of outcomes of care were included. In 21 studies, a statistically significant positive effect of auditing was reported. In 5 studies a positive effect was found, but this was either not significant or statistical significance was not determined. In 2 studies no effect was observed. 5 studies compared the combination of auditing with a quality improvement project with auditing alone; 4 of these reported an additional effect of the quality improvement project. Audit and feedback of quality information seem to have a positive effect on the quality of surgical care. The use of quality information from audits for the purpose of a quality improvement project can enhance the positive effect of the audit.

  11. Application of the Toyota Production System improves core laboratory operations.

    PubMed

    Rutledge, Joe; Xu, Min; Simpson, Joanne

    2010-01-01

    To meet the increased clinical demands of our hospital expansion, improve quality, and reduce costs, our tertiary care, pediatric core laboratory used the Toyota Production System lean processing to reorganize our 24-hour, 7 d/wk core laboratory. A 4-month, consultant-driven process removed waste, led to a physical reset of the space to match the work flow, and developed a work cell for our random access analyzers. In addition, visual controls, single piece flow, standard work, and "5S" were instituted. The new design met our goals as reflected by achieving and maintaining improved turnaround time (TAT; mean for creatinine reduced from 54 to 23 minutes) with increased testing volume (20%), monetary savings (4 full-time equivalents), decreased variability in TAT, and better space utilization (25% gain). The project had the unanticipated consequence of eliminating STAT testing because our in-laboratory TAT for routine testing was less than our prior STAT turnaround goal. The viability of this approach is demonstrated by sustained gains and further PDCA (Plan, Do, Check, Act) improvements during the 4 years after completion of the project.

  12. Destination bioeconomy - The path towards a smarter, more sustainable future.

    PubMed

    Dupont-Inglis, Joanna; Borg, Agnes

    2018-01-25

    Five years following the publication of the EU Bioeconomy Strategy, this article discusses the state of play of the bioeconomy in Europe. Placing specific focus on Industrial Biotech, it outlines ten pragmatic recommendations from BIO-TIC [BIO-TIC, A roadmap to a thriving industrial biotechnology sector in Europe, 2015], an EU FP7 funded project completed in 2015 and coordinated by EuropaBio, comprehensively examining the hurdles to the development of a bioeconomy in Europe, enabled by industrial biotech. These include improving opportunities for feedstock producers within the bioeconomy; investigating the scope for using novel biomass; developing a workforce which can maintain Europe's competitiveness in industrial biotechnology; introducing a long-term, stable and transparent policy and incentive framework to promote the bioeconomy; improving public perception and awareness of industrial biotechnology and bio-based products; identifying, leveraging and building upon EU capabilities for pilot and demonstration facilities; promoting the use of co-products from processing; improving the bioconversion and downstream processing steps; improving access to financing for large-scale biorefinery projects; developing stronger relationships between conventional and non-conventional players. Copyright © 2017. Published by Elsevier B.V.

  13. Theory-based practice in a major medical centre.

    PubMed

    Alligood, Martha Raile

    2011-11-01

    This project was designed to improve care quality and nursing staff satisfaction. Nursing theory structures thought and action as demonstrated by evidence of improvement in complex health-care settings. Nursing administrators selected Modelling and Role-Modelling (MRM) for the theory-based practice goal in their strategic plan. An action research approach structured implementation of MRM in a 1-year consultation project in 2001-2002. Quality of health care improved according to national quality assessment ratings, as well as patient satisfaction and nurse satisfaction. Modelling and Role-Modelling demonstrated capacity to structure nursing thought and action in patient care in a major medical centre. Uniformity of patient care language was valued by nurses as well as by allied health providers who wished to learn the holistic MRM style of practice. The processes of MRM and action research contributed to project success. A positive health-care change project was carried out in a large medical centre with action research. Introducing MRM theory-based practice was a beneficial decision by nursing administration that improved care and nurse satisfaction. Attention to nursing practice stimulated career development among the nurses to pursue bachelors, masters, and doctoral degrees. © 2011 Blackwell Publishing Ltd.

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peck, T; Sparkman, D; Storch, N

    ''The LLNL Site-Specific Advanced Simulation and Computing (ASCI) Software Quality Engineering Recommended Practices VI.I'' document describes a set of recommended software quality engineering (SQE) practices for ASCI code projects at Lawrence Livermore National Laboratory (LLNL). In this context, SQE is defined as the process of building quality into software products by applying the appropriate guiding principles and management practices. Continual code improvement and ongoing process improvement are expected benefits. Certain practices are recommended, although projects may select the specific activities they wish to improve, and the appropriate time lines for such actions. Additionally, projects can rely on the guidance ofmore » this document when generating ASCI Verification and Validation (VSrV) deliverables. ASCI program managers will gather information about their software engineering practices and improvement. This information can be shared to leverage the best SQE practices among development organizations. It will further be used to ensure the currency and vitality of the recommended practices. This Overview is intended to provide basic information to the LLNL ASCI software management and development staff from the ''LLNL Site-Specific ASCI Software Quality Engineering Recommended Practices VI.I'' document. Additionally the Overview provides steps to using the ''LLNL Site-Specific ASCI Software Quality Engineering Recommended Practices VI.I'' document. For definitions of terminology and acronyms, refer to the Glossary and Acronyms sections in the ''LLNL Site-Specific ASCI Software Quality Engineering Recommended Practices VI.I''.« less

  15. Climate SPHINX: High-resolution present-day and future climate simulations with an improved representation of small-scale variability

    NASA Astrophysics Data System (ADS)

    Davini, Paolo; von Hardenberg, Jost; Corti, Susanna; Subramanian, Aneesh; Weisheimer, Antje; Christensen, Hannah; Juricke, Stephan; Palmer, Tim

    2016-04-01

    The PRACE Climate SPHINX project investigates the sensitivity of climate simulations to model resolution and stochastic parameterization. The EC-Earth Earth-System Model is used to explore the impact of stochastic physics in 30-years climate integrations as a function of model resolution (from 80km up to 16km for the atmosphere). The experiments include more than 70 simulations in both a historical scenario (1979-2008) and a climate change projection (2039-2068), using RCP8.5 CMIP5 forcing. A total amount of 20 million core hours will be used at end of the project (March 2016) and about 150 TBytes of post-processed data will be available to the climate community. Preliminary results show a clear improvement in the representation of climate variability over the Euro-Atlantic following resolution increase. More specifically, the well-known atmospheric blocking negative bias over Europe is definitely resolved. High resolution runs also show improved fidelity in representation of tropical variability - such as the MJO and its propagation - over the low resolution simulations. It is shown that including stochastic parameterization in the low resolution runs help to improve some of the aspects of the MJO propagation further. These findings show the importance of representing the impact of small scale processes on the large scale climate variability either explicitly (with high resolution simulations) or stochastically (in low resolution simulations).

  16. Quantifying the impacts of land surface schemes and dynamic vegetation on the model dependency of projected changes in surface energy and water budgets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yu, Miao; Wang, Guiling; Chen, Haishan

    Assessing and quantifying the uncertainties in projected future changes of energy and water budgets over land surface are important steps toward improving our confidence in climate change projections. In our study, the contribution of land surface models to the inter-GCM variation of projected future changes in land surface energy and water fluxes are assessed based on output from 19 global climate models (GCMs) and offline Community Land Model version 4 (CLM4) simulations driven by meteorological forcing from the 19 GCMs. Similar offline simulations using CLM4 with its dynamic vegetation submodel are also conducted to investigate how dynamic vegetation feedback, amore » process that is being added to more earth system models, may amplify or moderate the intermodel variations of projected future changes. Projected changes are quantified as the difference between the 2081–2100 period from the Representative Concentration Pathway 8.5 (RCP8.5) future experiment and the 1981–2000 period from the historical simulation. Under RCP8.5, projected changes in surface water and heat fluxes show a high degree of model dependency across the globe. Although precipitation is very likely to increase in the high latitudes of the Northern Hemisphere, a high degree of model-related uncertainty exists for evapotranspiration, soil water content, and surface runoff, suggesting discrepancy among land surface models (LSMs) in simulating the surface hydrological processes and snow-related processes. Large model-related uncertainties for the surface water budget also exist in the Tropics including southeastern South America and Central Africa. Moreover, these uncertainties would be reduced in the hypothetical scenario of a single near-perfect land surface model being used across all GCMs, suggesting the potential to reduce uncertainties through the use of more consistent approaches toward land surface model development. Under such a scenario, the most significant reduction is likely to be seen in the Northern Hemisphere high latitudes. Including representation of vegetation dynamics is expected to further amplify the model-related uncertainties in projected future changes in surface water and heat fluxes as well as soil moisture content. This is especially the case in the high latitudes of the Northern Hemisphere (e.g., northwestern North America and central North Asia) where the projected vegetation changes are uncertain and in the Tropics (e.g., the Amazon and Congo Basins) where dense vegetation exists. Finally, findings from this study highlight the importance of improving land surface model parameterizations related to soil and snow processes, as well as the importance of improving the accuracy of dynamic vegetation models.« less

  17. Quantifying the impacts of land surface schemes and dynamic vegetation on the model dependency of projected changes in surface energy and water budgets

    DOE PAGES

    Yu, Miao; Wang, Guiling; Chen, Haishan

    2016-03-01

    Assessing and quantifying the uncertainties in projected future changes of energy and water budgets over land surface are important steps toward improving our confidence in climate change projections. In our study, the contribution of land surface models to the inter-GCM variation of projected future changes in land surface energy and water fluxes are assessed based on output from 19 global climate models (GCMs) and offline Community Land Model version 4 (CLM4) simulations driven by meteorological forcing from the 19 GCMs. Similar offline simulations using CLM4 with its dynamic vegetation submodel are also conducted to investigate how dynamic vegetation feedback, amore » process that is being added to more earth system models, may amplify or moderate the intermodel variations of projected future changes. Projected changes are quantified as the difference between the 2081–2100 period from the Representative Concentration Pathway 8.5 (RCP8.5) future experiment and the 1981–2000 period from the historical simulation. Under RCP8.5, projected changes in surface water and heat fluxes show a high degree of model dependency across the globe. Although precipitation is very likely to increase in the high latitudes of the Northern Hemisphere, a high degree of model-related uncertainty exists for evapotranspiration, soil water content, and surface runoff, suggesting discrepancy among land surface models (LSMs) in simulating the surface hydrological processes and snow-related processes. Large model-related uncertainties for the surface water budget also exist in the Tropics including southeastern South America and Central Africa. Moreover, these uncertainties would be reduced in the hypothetical scenario of a single near-perfect land surface model being used across all GCMs, suggesting the potential to reduce uncertainties through the use of more consistent approaches toward land surface model development. Under such a scenario, the most significant reduction is likely to be seen in the Northern Hemisphere high latitudes. Including representation of vegetation dynamics is expected to further amplify the model-related uncertainties in projected future changes in surface water and heat fluxes as well as soil moisture content. This is especially the case in the high latitudes of the Northern Hemisphere (e.g., northwestern North America and central North Asia) where the projected vegetation changes are uncertain and in the Tropics (e.g., the Amazon and Congo Basins) where dense vegetation exists. Finally, findings from this study highlight the importance of improving land surface model parameterizations related to soil and snow processes, as well as the importance of improving the accuracy of dynamic vegetation models.« less

  18. Status of the Development of Flight Power Processing Units for the NASAs Evolutionary Xenon Thruster - Commercial (NEXT-C) Project

    NASA Technical Reports Server (NTRS)

    Aulisio, Michael V.; Pinero, Luis R.; White, Brandon L.; Hickman, Tyler A.; Bontempo, James J.; Hertel, Thomas A.; Birchenough, Arthur G.

    2016-01-01

    A pathfinder prototype unit and two flight power processing units (PPUs) are being developed by the Aerojet Rocketdyne Corporation in Redmond, Washington and ZIN Technologies in Cleveland, Ohio, in support of the NEXT-C Project. This project is being led by the NASA Glenn Research Center in Cleveland, Ohio, and will also yield two flight thrusters. This hardware is being considered to be provided as Government Furnished Equipment for the New Frontiers Program, and is applicable to a variety of planetary science missions and astrophysics science missions. The design of the NEXT-C PPU evolves from the hardware fabricated under the NEXT technology development project. The power processing unit operates from two sources: a wide input 80 to 160 V high-power bus and a nominal 28 V low-power bus. The unit includes six power supplies. Four power supplies (beam, accelerator, discharge, and neutralizer keeper) are needed for steady state operation, while two cathode heater power supplies (neutralizer and discharge) are utilized during thruster startup. The unit in total delivers up to 7 kW of regulated power to a single gridded-ion thruster. Significant modifications to the initial design include: high-power adaptive-delay control, upgrade of design to EEE-INST-002 compliance, telemetry accuracy improvements, incorporation of telemetry to detect plume-mode operation, and simplification of the design in select areas to improve manufacturability and commercialization potential. The project is presently in the prototype phase and preparing for qualification level environmental testing.

  19. Integration of Value Stream Map and Healthcare Failure Mode and Effect Analysis into Six Sigma Methodology to Improve Process of Surgical Specimen Handling.

    PubMed

    Hung, Sheng-Hui; Wang, Pa-Chun; Lin, Hung-Chun; Chen, Hung-Ying; Su, Chao-Ton

    2015-01-01

    Specimen handling is a critical patient safety issue. Problematic handling process, such as misidentification (of patients, surgical site, and specimen counts), specimen loss, or improper specimen preparation can lead to serious patient harms and lawsuits. Value stream map (VSM) is a tool used to find out non-value-added works, enhance the quality, and reduce the cost of the studied process. On the other hand, healthcare failure mode and effect analysis (HFMEA) is now frequently employed to avoid possible medication errors in healthcare process. Both of them have a goal similar to Six Sigma methodology for process improvement. This study proposes a model that integrates VSM and HFMEA into the framework, which mainly consists of define, measure, analyze, improve, and control (DMAIC), of Six Sigma. A Six Sigma project for improving the process of surgical specimen handling in a hospital was conducted to demonstrate the effectiveness of the proposed model.

  20. Optimizing the electronic health record to standardize administration and documentation of nutritional supplements

    PubMed Central

    Citty, Sandra W.; Kamel, Amir; Garvan, Cynthia; Marlowe, Lee; Westhoff, Lynn

    2017-01-01

    Malnutrition in hospitalized patients is a major cause for hospital re-admission, pressure ulcers and increased hospital costs. Methods to improve the administration and documentation of nutritional supplements for hospitalized patients are needed to improve patient care, outcomes and resource utilization. Staff at a medium-sized academic health science center hospital in the southeastern United States noted that nutritional supplements ordered for patients at high risk for malnutrition were not offered or administered to patients in a standardized manner and/or not documented clearly in the electronic health record as per prescription. This paper reports on a process improvement project that redesigned the ordering, administration and documentation process of oral nutritional supplements in the electronic health record. By adding nutritional products to the medication order sets and adding an electronic nutrition administration record (ENAR) tab, the multidisciplinary team sought to standardize nutritional supplement ordering, documentation and administration at prescribed intervals. This process improvement project used a triangulated approach to evaluating pre- and post-process change including: medical record reviews, patient interviews, and nutrition formula room log reports. Staff education and training was carried out prior to initiation of the system changes. This process change resulted in an average decrease in the return of unused nutritional formula from 76% returned at baseline to 54% post-process change. The process change resulted in 100% of nutritional supplement orders having documentation about nutritional medication administration and/or reason for non-administration. Documentation in the ENAR showed that 41% of ONS orders were given and 59% were not given. Significantly more patients reported being offered the ONS product (p=0.0001) after process redesign and more patients (5% before ENAR and 86% after ENAR reported being offered the correct type, amount and frequency of nutritional products (p=0.0001). ENAR represented an effective strategy to improve administration and documentation of nutritional supplements for hospitalized patients. PMID:28243439

Top