NASA Astrophysics Data System (ADS)
Pershin, I. M.; Pervukhin, D. A.; Ilyushin, Y. V.; Afanaseva, O. V.
2017-10-01
The paper considers an important problem of designing distributed systems of hydrolithosphere processes management. The control actions on the hydrolithosphere processes under consideration are implemented by a set of extractive wells. The article shows the method of defining the approximation links for description of the dynamic characteristics of hydrolithosphere processes. The structure of distributed regulators, used in the management systems by the considered processes, is presented. The paper analyses the results of the synthesis of the distributed management system and the results of modelling the closed-loop control system by the parameters of the hydrolithosphere process.
23 CFR 970.204 - Management systems requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases with a geographical reference system that can be used to geolocate all database information. (e...
23 CFR 970.204 - Management systems requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases with a geographical reference system that can be used to geolocate all database information. (e...
23 CFR 970.204 - Management systems requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases with a geographical reference system that can be used to geolocate all database information. (e...
23 CFR 970.204 - Management systems requirements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases with a geographical reference system that can be used to geolocate all database information. (e...
ERIC Educational Resources Information Center
Dawson, Frances Trigg
A study was made to determine the relationships between (1) satisfaction of members with service club management processes and member's perception of management systems, (2) perception of service club management system to selected independent variables, and (3) satisfaction to perception of service club management systems with independent…
23 CFR 971.204 - Management systems requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases with a common or coordinated reference system, that can be used to geolocate all database information...
23 CFR 971.204 - Management systems requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases with a common or coordinated reference system, that can be used to geolocate all database information...
23 CFR 971.204 - Management systems requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases with a common or coordinated reference system, that can be used to geolocate all database information...
23 CFR 971.204 - Management systems requirements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases with a common or coordinated reference system, that can be used to geolocate all database information...
23 CFR 971.204 - Management systems requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS HIGHWAYS FOREST SERVICE... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases...
23 CFR 970.204 - Management systems requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS HIGHWAYS NATIONAL PARK... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases...
Workflow management systems in radiology
NASA Astrophysics Data System (ADS)
Wendler, Thomas; Meetz, Kirsten; Schmidt, Joachim
1998-07-01
In a situation of shrinking health care budgets, increasing cost pressure and growing demands to increase the efficiency and the quality of medical services, health care enterprises are forced to optimize or complete re-design their processes. Although information technology is agreed to potentially contribute to cost reduction and efficiency improvement, the real success factors are the re-definition and automation of processes: Business Process Re-engineering and Workflow Management. In this paper we discuss architectures for the use of workflow management systems in radiology. We propose to move forward from information systems in radiology (RIS, PACS) to Radiology Management Systems, in which workflow functionality (process definitions and process automation) is implemented through autonomous workflow management systems (WfMS). In a workflow oriented architecture, an autonomous workflow enactment service communicates with workflow client applications via standardized interfaces. In this paper, we discuss the need for and the benefits of such an approach. The separation of workflow management system and application systems is emphasized, and the consequences that arise for the architecture of workflow oriented information systems. This includes an appropriate workflow terminology, and the definition of standard interfaces for workflow aware application systems. Workflow studies in various institutions have shown that most of the processes in radiology are well structured and suited for a workflow management approach. Numerous commercially available Workflow Management Systems (WfMS) were investigated, and some of them, which are process- oriented and application independent, appear suitable for use in radiology.
A Process Management System for Networked Manufacturing
NASA Astrophysics Data System (ADS)
Liu, Tingting; Wang, Huifen; Liu, Linyan
With the development of computer, communication and network, networked manufacturing has become one of the main manufacturing paradigms in the 21st century. Under the networked manufacturing environment, there exist a large number of cooperative tasks susceptible to alterations, conflicts caused by resources and problems of cost and quality. This increases the complexity of administration. Process management is a technology used to design, enact, control, and analyze networked manufacturing processes. It supports efficient execution, effective management, conflict resolution, cost containment and quality control. In this paper we propose an integrated process management system for networked manufacturing. Requirements of process management are analyzed and architecture of the system is presented. And a process model considering process cost and quality is developed. Finally a case study is provided to explain how the system runs efficiently.
Implementation of Integrated System Fault Management Capability
NASA Technical Reports Server (NTRS)
Figueroa, Fernando; Schmalzel, John; Morris, Jon; Smith, Harvey; Turowski, Mark
2008-01-01
Fault Management to support rocket engine test mission with highly reliable and accurate measurements; while improving availability and lifecycle costs. CORE ELEMENTS: Architecture, taxonomy, and ontology (ATO) for DIaK management. Intelligent Sensor Processes; Intelligent Element Processes; Intelligent Controllers; Intelligent Subsystem Processes; Intelligent System Processes; Intelligent Component Processes.
An architecture for heuristic control of real-time processes
NASA Technical Reports Server (NTRS)
Raulefs, P.; Thorndyke, P. W.
1987-01-01
Abstract Process management combines complementary approaches of heuristic reasoning and analytical process control. Management of a continuous process requires monitoring the environment and the controlled system, assessing the ongoing situation, developing and revising planned actions, and controlling the execution of the actions. For knowledge-intensive domains, process management entails the potentially time-stressed cooperation among a variety of expert systems. By redesigning a blackboard control architecture in an object-oriented framework, researchers obtain an approach to process management that considerably extends blackboard control mechanisms and overcomes limitations of blackboard systems.
IEC 61511 and the capital project process--a protective management system approach.
Summers, Angela E
2006-03-17
This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.
Process for Managing and Customizing HPC Operating Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, David ML
2014-04-02
A process for maintaining a custom HPC operating system was developed at the Environmental Molecular Sciences Laboratory (EMSL) over the past ten years. This process is generic and flexible to manage continuous change as well as keep systems updated while managing communication through well defined pieces of software.
Yu, Wen-Kang; Dong, Ling; Pei, Wen-Xuan; Sun, Zhi-Rong; Dai, Jun-Dong; Wang, Yun
2017-12-01
The whole process quality control and management of traditional Chinese medicine (TCM) decoction pieces is a system engineering, involving the base environment, seeds and seedlings, harvesting, processing and other multiple steps, so the accurate identification of factors in TCM production process that may induce the quality risk, as well as reasonable quality control measures are very important. At present, the concept of quality risk is mainly concentrated in the aspects of management and regulations, etc. There is no comprehensive analysis on possible risks in the quality control process of TCM decoction pieces, or analysis summary of effective quality control schemes. A whole process quality control and management system for TCM decoction pieces based on TCM quality tree was proposed in this study. This system effectively combined the process analysis method of TCM quality tree with the quality risk management, and can help managers to make real-time decisions while realizing the whole process quality control of TCM. By providing personalized web interface, this system can realize user-oriented information feedback, and was convenient for users to predict, evaluate and control the quality of TCM. In the application process, the whole process quality control and management system of the TCM decoction pieces can identify the related quality factors such as base environment, cultivation and pieces processing, extend and modify the existing scientific workflow according to their own production conditions, and provide different enterprises with their own quality systems, to achieve the personalized service. As a new quality management model, this paper can provide reference for improving the quality of Chinese medicine production and quality standardization. Copyright© by the Chinese Pharmaceutical Association.
Design distributed simulation platform for vehicle management system
NASA Astrophysics Data System (ADS)
Wen, Zhaodong; Wang, Zhanlin; Qiu, Lihua
2006-11-01
Next generation military aircraft requires the airborne management system high performance. General modules, data integration, high speed data bus and so on are needed to share and manage information of the subsystems efficiently. The subsystems include flight control system, propulsion system, hydraulic power system, environmental control system, fuel management system, electrical power system and so on. The unattached or mixed architecture is changed to integrated architecture. That means the whole airborne system is regarded into one system to manage. So the physical devices are distributed but the system information is integrated and shared. The process function of each subsystem are integrated (including general process modules, dynamic reconfiguration), furthermore, the sensors and the signal processing functions are shared. On the other hand, it is a foundation for power shared. Establish a distributed vehicle management system using 1553B bus and distributed processors which can provide a validation platform for the research of airborne system integrated management. This paper establishes the Vehicle Management System (VMS) simulation platform. Discuss the software and hardware configuration and analyze the communication and fault-tolerant method.
Software And Systems Engineering Risk Management
2010-04-01
RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software
ERIC Educational Resources Information Center
Council of the Great City Schools, Washington, DC.
This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…
76 FR 46774 - Privacy Act of 1974; System of Records-Federal Student Aid Application File
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-03
... Information and Regulatory Affairs in the Office of Management and Budget (OMB), on July 21, 2011. This... altered system of records to: Director, Application Processing Division, Program Management Systems...: Director, Application Processing Division, Program Management Systems, Federal Student Aid, U.S. Department...
Scrapping Patched Computer Systems: Integrated Data Processing for Information Management.
ERIC Educational Resources Information Center
Martinson, Linda
1991-01-01
Colleges and universities must find a way to streamline and integrate information management processes across the organization. The Georgia Institute of Technology responded to an acute problem of dissimilar operating systems with a campus-wide integrated administrative system using a machine independent relational database management system. (MSE)
Synthesis of an integrated cockpit management system
NASA Technical Reports Server (NTRS)
Dasaro, J. A.; Elliott, C. T.
1982-01-01
The process used in the synthesis of an integrated cockpit management system was discussed. Areas covered included flight displays, subsystem management, checklists, and procedures (both normal and emergency). The process of evolving from the unintegrated conventional system to the integrated system is examined and a brief description of the results presented.
Establishment of Textbook Information Management System Based on Active Server Page
ERIC Educational Resources Information Center
Geng, Lihua
2011-01-01
In the process of textbook management of universities, the flow of storage, collection and check of textbook is quite complicated and daily management flow and system also seriously constrains the efficiency of the management process. Thus, in order to combine the information management model and the traditional management model, it is necessary…
Finance and supply management project execution plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENNION, S.I.
As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.
Configuration and Data Management Process and the System Safety Professional
NASA Technical Reports Server (NTRS)
Shivers, Charles Herbert; Parker, Nelson C. (Technical Monitor)
2001-01-01
This article presents a discussion of the configuration management (CM) and the Data Management (DM) functions and provides a perspective of the importance of configuration and data management processes to the success of system safety activities. The article addresses the basic requirements of configuration and data management generally based on NASA configuration and data management policies and practices, although the concepts are likely to represent processes of any public or private organization's well-designed configuration and data management program.
The six critical attributes of the next generation of quality management software systems.
Clark, Kathleen
2011-07-01
Driven by both the need to meet regulatory requirements and a genuine desire to drive improved quality, quality management systems encompassing standard operating procedure, corrective and preventative actions and related processes have existed for many years, both in paper and electronic form. The impact of quality management systems on 'actual' quality, however, is often reported as far less than desired. A quality management software system that moves beyond formal forms-driven processes to include a true closed loop design, manage disparate processes across the enterprise, provide support for collaborative processes and deliver insight into the overall state of control has the potential to close the gap between simply accomplishing regulatory compliance and delivering measurable improvements in quality and efficiency.
Adaptive management for ecosystem services (j/a) | Science ...
Management of natural resources for the production of ecosystem services, which are vital for human well-being, is necessary even when there is uncertainty regarding system response to management action. This uncertainty is the result of incomplete controllability, complex internal feedbacks, and non-linearity that often interferes with desired management outcomes, and insufficient understanding of nature and people. Adaptive management was developed to reduce such uncertainty. We present a framework for the application of adaptive management for ecosystem services that explicitly accounts for cross-scale tradeoffs in the production of ecosystem services. Our framework focuses on identifying key spatiotemporal scales (plot, patch, ecosystem, landscape, and region) that encompass dominant structures and processes in the system, and includes within- and cross-scale dynamics, ecosystem service tradeoffs, and management controllability within and across scales. Resilience theory recognizes that a limited set of ecological processes in a given system regulate ecosystem services, yet our understanding of these processes is poorly understood. If management actions erode or remove these processes, the system may shift into an alternative state unlikely to support the production of desired services. Adaptive management provides a process to assess the underlying within and cross-scale tradeoffs associated with production of ecosystem services while proceeding with manage
A conceptual persistent healthcare quality improvement process for software development management.
Lin, Jen-Chiun; Su, Mei-Ju; Cheng, Po-Hsun; Weng, Yung-Chien; Chen, Sao-Jie; Lai, Jin-Shin; Lai, Feipei
2007-01-01
This paper illustrates a sustained conceptual service quality improvement process for the management of software development within a healthcare enterprise. Our proposed process is revised from Niland's healthcare quality information system (HQIS). This process includes functions to survey the satisfaction of system functions, describe the operation bylaws on-line, and provide on-demand training. To achieve these goals, we integrate five information systems in National Taiwan University Hospital, including healthcare information systems, health quality information system, requirement management system, executive information system, and digital learning system, to form a full Deming cycle. A preliminary user satisfaction survey showed that our outpatient information system scored an average of 71.31 in 2006.
NASA Astrophysics Data System (ADS)
Pan, Tianheng
2018-01-01
In recent years, the combination of workflow management system and Multi-agent technology is a hot research field. The problem of lack of flexibility in workflow management system can be improved by introducing multi-agent collaborative management. The workflow management system adopts distributed structure. It solves the problem that the traditional centralized workflow structure is fragile. In this paper, the agent of Distributed workflow management system is divided according to its function. The execution process of each type of agent is analyzed. The key technologies such as process execution and resource management are analyzed.
From Process to Product: Your Risk Process at Work
NASA Technical Reports Server (NTRS)
Kundrot, Craig E.; Fogarty, Jenifer; Charles, John; Buquo, Lynn; Sibonga, Jean; Alexander, David; Horn, Wayne G.; Edwards, J. Michelle
2010-01-01
The Space Life Sciences Directorate (SLSD) and Human Research Program (HRP) at the NASA/Johnson Space Center work together to address and manage the human health and performance risks associated with human space flight. This includes all human system requirements before, during, and after space flight, providing for research, and managing the risk of adverse long-term health outcomes for the crew. We previously described the framework and processes developed for identifying and managing these human system risks. The focus of this panel is to demonstrate how the implementation of the framework and associated processes has provided guidance in the management and communication of human system risks. The risks of early onset osteoporosis, CO2 exposure, and intracranial hypertension in particular have all benefitted from the processes developed for human system risk management. Moreover, we are continuing to develop capabilities, particularly in the area of information architecture, which will also be described. We are working to create a system whereby all risks and associated actions can be tracked and related to one another electronically. Such a system will enhance the management and communication capabilities for the human system risks, thereby increasing the benefit to researchers and flight surgeons.
Resource Management Scheme Based on Ubiquitous Data Analysis
Lee, Heung Ki; Jung, Jaehee
2014-01-01
Resource management of the main memory and process handler is critical to enhancing the system performance of a web server. Owing to the transaction delay time that affects incoming requests from web clients, web server systems utilize several web processes to anticipate future requests. This procedure is able to decrease the web generation time because there are enough processes to handle the incoming requests from web browsers. However, inefficient process management results in low service quality for the web server system. Proper pregenerated process mechanisms are required for dealing with the clients' requests. Unfortunately, it is difficult to predict how many requests a web server system is going to receive. If a web server system builds too many web processes, it wastes a considerable amount of memory space, and thus performance is reduced. We propose an adaptive web process manager scheme based on the analysis of web log mining. In the proposed scheme, the number of web processes is controlled through prediction of incoming requests, and accordingly, the web process management scheme consumes the least possible web transaction resources. In experiments, real web trace data were used to prove the improved performance of the proposed scheme. PMID:25197692
Sens, Brigitte
2010-01-01
The concept of general process orientation as an instrument of organisation development is the core principle of quality management philosophy, i.e. the learning organisation. Accordingly, prestigious quality awards and certification systems focus on process configuration and continual improvement. In German health care organisations, particularly in hospitals, this general process orientation has not been widely implemented yet - despite enormous change dynamics and the requirements of both quality and economic efficiency of health care processes. But based on a consistent process architecture that considers key processes as well as management and support processes, the strategy of excellent health service provision including quality, safety and transparency can be realised in daily operative work. The core elements of quality (e.g., evidence-based medicine), patient safety and risk management, environmental management, health and safety at work can be embedded in daily health care processes as an integrated management system (the "all in one system" principle). Sustainable advantages and benefits for patients, staff, and the organisation will result: stable, high-quality, efficient, and indicator-based health care processes. Hospitals with their broad variety of complex health care procedures should now exploit the full potential of total process orientation. Copyright © 2010. Published by Elsevier GmbH.
Database management systems for process safety.
Early, William F
2006-03-17
Several elements of the process safety management regulation (PSM) require tracking and documentation of actions; process hazard analyses, management of change, process safety information, operating procedures, training, contractor safety programs, pre-startup safety reviews, incident investigations, emergency planning, and compliance audits. These elements can result in hundreds of actions annually that require actions. This tracking and documentation commonly is a failing identified in compliance audits, and is difficult to manage through action lists, spreadsheets, or other tools that are comfortably manipulated by plant personnel. This paper discusses the recent implementation of a database management system at a chemical plant and chronicles the improvements accomplished through the introduction of a customized system. The system as implemented modeled the normal plant workflows, and provided simple, recognizable user interfaces for ease of use.
Spectrum Situational Awareness Capability: The Military Need and Potential Implementation Issues
2006-10-01
Management Sensor Systems Frequency Management EW Systems Frequency Management Allied Battlespace Spectrum Management Restricted Frequency List Frequency...Management Restricted Frequency List Frequency Allocation Table Civil Frequency Use Data Inputs Negotiation and allocation process © Dstl 2006 26th...Management Restricted Frequency List Data Inputs Negotiation and allocation process Frequency Allocation Table SSA ES INT COP etc WWW Spectrum
Health-care process improvement decisions: a systems perspective.
Walley, Paul; Silvester, Kate; Mountford, Shaun
2006-01-01
The paper seeks to investigate decision-making processes within hospital improvement activity, to understand how performance measurement systems influence decisions and potentially lead to unsuccessful or unsustainable process changes. A longitudinal study over a 33-month period investigates key events, decisions and outcomes at one medium-sized hospital in the UK. Process improvement events are monitored using process control methods and by direct observation. The authors took a systems perspective of the health-care processes, ensuring that the impacts of decisions across the health-care supply chain were appropriately interpreted. The research uncovers the ways in which measurement systems disguise failed decisions and encourage managers to take a low-risk approach of "symptomatic relief" when trying to improve performance metrics. This prevents many managers from trying higher risk, sustainable process improvement changes. The behaviour of the health-care system is not understood by many managers and this leads to poor analysis of problem situations. Measurement using time-series methodologies, such as statistical process control are vital for a better understanding of the systems impact of changes. Senior managers must also be aware of the behavioural influence of similar performance measurement systems that discourage sustainable improvement. There is a risk that such experiences will tarnish the reputation of performance management as a discipline. Recommends process control measures as a way of creating an organization memory of how decisions affect performance--something that is currently lacking.
1979-12-01
the functional management level, a real-time production con- trol system and an order processing system at the operational level. SIDMS was designed...at any one time. 26 An overview of the major software systems in operation is listed below: a. Major Software Systems: Order processing system e Order ... processing for the supply support center/AWP locker. e Order processing for the airwing squadron material controls. e Order processing for the IMA
Radiology information system: a workflow-based approach.
Zhang, Jinyan; Lu, Xudong; Nie, Hongchao; Huang, Zhengxing; van der Aalst, W M P
2009-09-01
Introducing workflow management technology in healthcare seems to be prospective in dealing with the problem that the current healthcare Information Systems cannot provide sufficient support for the process management, although several challenges still exist. The purpose of this paper is to study the method of developing workflow-based information system in radiology department as a use case. First, a workflow model of typical radiology process was established. Second, based on the model, the system could be designed and implemented as a group of loosely coupled components. Each component corresponded to one task in the process and could be assembled by the workflow management system. The legacy systems could be taken as special components, which also corresponded to the tasks and were integrated through transferring non-work- flow-aware interfaces to the standard ones. Finally, a workflow dashboard was designed and implemented to provide an integral view of radiology processes. The workflow-based Radiology Information System was deployed in the radiology department of Zhejiang Chinese Medicine Hospital in China. The results showed that it could be adjusted flexibly in response to the needs of changing process, and enhance the process management in the department. It can also provide a more workflow-aware integration method, comparing with other methods such as IHE-based ones. The workflow-based approach is a new method of developing radiology information system with more flexibility, more functionalities of process management and more workflow-aware integration. The work of this paper is an initial endeavor for introducing workflow management technology in healthcare.
Generic Health Management: A System Engineering Process Handbook Overview and Process
NASA Technical Reports Server (NTRS)
Wilson, Moses Lee; Spruill, Jim; Hong, Yin Paw
1995-01-01
Health Management, a System Engineering Process, is one of those processes-techniques-and-technologies used to define, design, analyze, build, verify, and operate a system from the viewpoint of preventing, or minimizing, the effects of failure or degradation. It supports all ground and flight elements during manufacturing, refurbishment, integration, and operation through combined use of hardware, software, and personnel. This document will integrate Health Management Processes (six phases) into five phases in such a manner that it is never a stand alone task/effort which separately defines independent work functions.
Case management information systems: how to put the pieces together now and beyond year 2000.
Matthews, Pamela
2002-01-01
The case management process is a critical management and operational component in the delivery of customer services across the patient care continuum. Case management has transcended time and will continue to be a viable infrastructure process for successful organizations in the future. A key component of the case management infrastructure is information systems and technology support. Case management challenges include effective deployment and use of systems and technology. As more sophisticated, integrated systems are made available, case managers can use these tools to continue to expand effectively beyond the patient's episodic event to provide greater levels of cradle-to-grave management of healthcare. This article explores methods for defining case management system needs and identifying automation options available to the case manager.
NASA Astrophysics Data System (ADS)
Gleason, J. L.; Hillyer, T. N.; Wilkins, J.
2012-12-01
The CERES Science Team integrates data from 5 CERES instruments onboard the Terra, Aqua and NPP missions. The processing chain fuses CERES observations with data from 19 other unique sources. The addition of CERES Flight Model 5 (FM5) onboard NPP, coupled with ground processing system upgrades further emphasizes the need for an automated job-submission utility to manage multiple processing streams concurrently. The operator-driven, legacy-processing approach relied on manually staging data from magnetic tape to limited spinning disk attached to a shared memory architecture system. The migration of CERES production code to a distributed, cluster computing environment with approximately one petabyte of spinning disk containing all precursor input data products facilitates the development of a CERES-specific, automated workflow manager. In the cluster environment, I/O is the primary system resource in contention across jobs. Therefore, system load can be maximized with a throttling workload manager. This poster discusses a Java and Perl implementation of an automated job management tool tailored for CERES processing.
OPERATIONS RESEARCH IN THE DESIGN OF MANAGEMENT INFORMATION SYSTEMS
management information systems is concerned with the identification and detailed specification of the information and data processing...of advanced data processing techniques in management information systems today, the close coordination of operations research and data systems activities has become a practical necessity for the modern business firm.... information systems in which mathematical models are employed as the basis for analysis and systems design. Operations research provides a
Adaptive management for ecosystem services.
Birgé, Hannah E; Allen, Craig R; Garmestani, Ahjond S; Pope, Kevin L
2016-12-01
Management of natural resources for the production of ecosystem services, which are vital for human well-being, is necessary even when there is uncertainty regarding system response to management action. This uncertainty is the result of incomplete controllability, complex internal feedbacks, and non-linearity that often interferes with desired management outcomes, and insufficient understanding of nature and people. Adaptive management was developed to reduce such uncertainty. We present a framework for the application of adaptive management for ecosystem services that explicitly accounts for cross-scale tradeoffs in the production of ecosystem services. Our framework focuses on identifying key spatiotemporal scales (plot, patch, ecosystem, landscape, and region) that encompass dominant structures and processes in the system, and includes within- and cross-scale dynamics, ecosystem service tradeoffs, and management controllability within and across scales. Resilience theory recognizes that a limited set of ecological processes in a given system regulate ecosystem services, yet our understanding of these processes is poorly understood. If management actions erode or remove these processes, the system may shift into an alternative state unlikely to support the production of desired services. Adaptive management provides a process to assess the underlying within and cross-scale tradeoffs associated with production of ecosystem services while proceeding with management designed to meet the demands of a growing human population. Copyright © 2016 Elsevier Ltd. All rights reserved.
TQM (Total Quality Management) SPARC (Special Process Action Review Committees) Handbook
1989-08-01
This document describes the techniques used to support and guide the Special Process Action Review Committees for accomplishing their goals for Total Quality Management (TQM). It includes concepts and definitions, checklists, sample formats, and assessment criteria. Keywords: Continuous process improvement; Logistics information; Process analysis; Quality control; Quality assurance; Total Quality Management ; Statistical processes; Management Planning and control; Management training; Management information systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... management information system (MMIS) means a mechanized claims processing and information retrieval system—referred to as Medicaid Management Information Systems (MMIS)—that meets specified requirements and that... include claims processing and retrieval of utilization and management information necessary for program...
Systems approach provides management control of complex programs
NASA Technical Reports Server (NTRS)
Dudek, E. F., Jr.; Mc Carthy, J. F., Jr.
1970-01-01
Integrated program management process provides management visual assistance through three interrelated charts - system model that identifies each function to be performed, matrix that identifies personnel responsibilities for these functions, process chart that breaks down the functions into discrete tasks.
General RMP Guidance - Chapter 5: Management System
If you have at least one Program 2 or Program 3 process, you are required to develop a management system to oversee the implementation of the risk management program elements, and designate responsibility for making process safety a constant priority.
Engineering Supply Management System: The Next Generation
1991-09-01
010 Partia! receipts 0018 Automatic inventory update 0 048 Discrepant material 0 004 Order processing requirements Transaction reversal capability 0 012...August 1991. 2-5 sys.em’s modules that support the DEH’s needs are the Sales Order Processing , Register Sales, Purchase Order Processing , Inventory...modular system developed by PIC Business Systems, Incorporated. This system possesses Order Processing , Inventory Management, Purchase Orders, and
Information systems for material flow management in construction processes
NASA Astrophysics Data System (ADS)
Mesároš, P.; Mandičák, T.
2015-01-01
The article describes the options for the management of material flows in the construction process. Management and resource planning is one of the key factors influencing the effectiveness of construction project. It is very difficult to set these flows correctly. The current period offers several options and tools to do this. Information systems and their modules can be used just for the management of materials in the construction process.
Wiemuth, M; Junger, D; Leitritz, M A; Neumann, J; Neumuth, T; Burgert, O
2017-08-01
Medical processes can be modeled using different methods and notations. Currently used modeling systems like Business Process Model and Notation (BPMN) are not capable of describing the highly flexible and variable medical processes in sufficient detail. We combined two modeling systems, Business Process Management (BPM) and Adaptive Case Management (ACM), to be able to model non-deterministic medical processes. We used the new Standards Case Management Model and Notation (CMMN) and Decision Management Notation (DMN). First, we explain how CMMN, DMN and BPMN could be used to model non-deterministic medical processes. We applied this methodology to model 79 cataract operations provided by University Hospital Leipzig, Germany, and four cataract operations provided by University Eye Hospital Tuebingen, Germany. Our model consists of 85 tasks and about 20 decisions in BPMN. We were able to expand the system with more complex situations that might appear during an intervention. An effective modeling of the cataract intervention is possible using the combination of BPM and ACM. The combination gives the possibility to depict complex processes with complex decisions. This combination allows a significant advantage for modeling perioperative processes.
NASA Astrophysics Data System (ADS)
Levchenko, N. G.; Glushkov, S. V.; Sobolevskaya, E. Yu; Orlov, A. P.
2018-05-01
The method of modeling the transport and logistics process using fuzzy neural network technologies has been considered. The analysis of the implemented fuzzy neural network model of the information management system of transnational multimodal transportation of the process showed the expediency of applying this method to the management of transport and logistics processes in the Arctic and Subarctic conditions. The modular architecture of this model can be expanded by incorporating additional modules, since the working conditions in the Arctic and the subarctic themselves will present more and more realistic tasks. The architecture allows increasing the information management system, without affecting the system or the method itself. The model has a wide range of application possibilities, including: analysis of the situation and behavior of interacting elements; dynamic monitoring and diagnostics of management processes; simulation of real events and processes; prediction and prevention of critical situations.
NASA Technical Reports Server (NTRS)
Elden, N. C.; Winkler, H. E.; Price, D. F.; Reysa, R. P.
1983-01-01
Water recovery subsystems are being tested at the NASA Lyndon B. Johnson Space Center for Space Station use to process waste water generated from urine and wash water collection facilities. These subsystems are being integrated into a water management system that will incorporate wash water and urine processing through the use of hyperfiltration and vapor compression distillation subsystems. Other hardware in the water management system includes a whole body shower, a clothes washing facility, a urine collection and pretreatment unit, a recovered water post-treatment system, and a water quality monitor. This paper describes the integrated test configuration, pertinent performance data, and feasibility and design compatibility conclusions of the integrated water management system.
Assessment of reservoir system variable forecasts
NASA Astrophysics Data System (ADS)
Kistenmacher, Martin; Georgakakos, Aris P.
2015-05-01
Forecast ensembles are a convenient means to model water resources uncertainties and to inform planning and management processes. For multipurpose reservoir systems, forecast types include (i) forecasts of upcoming inflows and (ii) forecasts of system variables and outputs such as reservoir levels, releases, flood damage risks, hydropower production, water supply withdrawals, water quality conditions, navigation opportunities, and environmental flows, among others. Forecasts of system variables and outputs are conditional on forecasted inflows as well as on specific management policies and can provide useful information for decision-making processes. Unlike inflow forecasts (in ensemble or other forms), which have been the subject of many previous studies, reservoir system variable and output forecasts are not formally assessed in water resources management theory or practice. This article addresses this gap and develops methods to rectify potential reservoir system forecast inconsistencies and improve the quality of management-relevant information provided to stakeholders and managers. The overarching conclusion is that system variable and output forecast consistency is critical for robust reservoir management and needs to be routinely assessed for any management model used to inform planning and management processes. The above are demonstrated through an application from the Sacramento-American-San Joaquin reservoir system in northern California.
Management of local economic and ecological system of coal processing company
NASA Astrophysics Data System (ADS)
Kiseleva, T. V.; Mikhailov, V. G.; Karasev, V. A.
2016-10-01
The management issues of local ecological and economic system of coal processing company - coal processing plant - are considered in the article. The objectives of the research are the identification and the analysis of local ecological and economic system (coal processing company) performance and the proposals for improving the mechanism to support the management decision aimed at improving its environmental safety. The data on the structure of run-of-mine coal processing products are shown. The analysis of main ecological and economic indicators of coal processing enterprises, characterizing the state of its environmental safety, is done. The main result of the study is the development of proposals to improve the efficiency of local enterprise ecological and economic system management, including technical, technological and business measures. The results of the study can be recommended to industrial enterprises to improve their ecological and economic efficiency.
NASA Astrophysics Data System (ADS)
Pershin, I. M.; Pervukhin, D. A.; Ilyushin, Y. V.; Afanaseva, O. V.
2017-10-01
The article considers the important issue of designing the distributed systems of hydrolithospere processes management. Control effects on the hydrolithospere processes are implemented by a set of extractive wells. The article shows how to determine the optimal number of extractive wells that provide a distributed control impact on the management object.
Tamaki, Edson Mamoru; Tanaka, Oswaldo Yoshimi; Felisberto, Eronildo; Alves, Cinthia Kalyne de Almeida; Drumond Junior, Marcos; Bezerra, Luciana Caroline de Albuquerque; Calvo, Maria Cristina Marino; Miranda, Alcides Silva de
2012-04-01
This study sought to develop methodology for the construction of a Panel for the Monitoring and Evaluation of Management of the Unified Health System (SUS). The participative process used in addition to the systematization conducted made it possible to identify an effective strategy for building management tools in partnership with researchers, academic institutions and managers of the SUS. The final systematization of the Panel selected indicators for the management of the SUS in terms of Demand, Inputs, Processes, Outputs and Outcomes in order to provide a simple, versatile and useful tool for evaluation at any level of management and more transparent and easier communication with all stakeholders in decision-making. Taking the management of the SUS as the scope of these processes and practices in all normative aspects enabled dialog between systemic theories and those which consider the centrality of the social actor in the decision-making process.
Management of major system programs and projects. Handbook
NASA Technical Reports Server (NTRS)
1993-01-01
This Handbook establishes the detailed policies and processes for implementing NMI 7120.4, 'Management of Major System Programs and Projects'. It constitutes a comprehensive source of the specific policies and processes governing management of major development programs/projects and is intended as a resource to the entire program/project management (PPM) community.
Requirements for company-wide management
NASA Technical Reports Server (NTRS)
Southall, J. W.
1980-01-01
Computing system requirements were developed for company-wide management of information and computer programs in an engineering data processing environment. The requirements are essential to the successful implementation of a computer-based engineering data management system; they exceed the capabilities provided by the commercially available data base management systems. These requirements were derived from a study entitled The Design Process, which was prepared by design engineers experienced in development of aerospace products.
Modeling Business Processes in Public Administration
NASA Astrophysics Data System (ADS)
Repa, Vaclav
During more than 10 years of its existence business process modeling became a regular part of organization management practice. It is mostly regarded. as a part of information system development or even as a way to implement some supporting technology (for instance workflow system). Although I do not agree with such reduction of the real meaning of a business process, it is necessary to admit that information technologies play an essential role in business processes (see [1] for more information), Consequently, an information system is inseparable from a business process itself because it is a cornerstone of the general basic infrastructure of a business. This fact impacts on all dimensions of business process management. One of these dimensions is the methodology that postulates that the information systems development provide the business process management with exact methods and tools for modeling business processes. Also the methodology underlying the approach presented in this paper has its roots in the information systems development methodology.
Officer Computer Utilization Report
1992-03-01
Shipboard Non-tactical ADP Program (SNAP),Navy Intelligence Processing System (NIPS), Retail Operation Management (ROM)). Mainframe - An extremely...ADP Program (SNAP), Navy Intelligence Processing System (NIPS), Retail Operation Management (ROM), etc.) @0230@6 7 7. Technical/tactical systems (e.g
Kawakami, Tomoya; Fujita, Naotaka; Yoshihisa, Tomoki; Tsukamoto, Masahiko
2014-01-01
In recent years, sensors become popular and Home Energy Management System (HEMS) takes an important role in saving energy without decrease in QoL (Quality of Life). Currently, many rule-based HEMSs have been proposed and almost all of them assume "IF-THEN" rules. The Rete algorithm is a typical pattern matching algorithm for IF-THEN rules. Currently, we have proposed a rule-based Home Energy Management System (HEMS) using the Rete algorithm. In the proposed system, rules for managing energy are processed by smart taps in network, and the loads for processing rules and collecting data are distributed to smart taps. In addition, the number of processes and collecting data are reduced by processing rules based on the Rete algorithm. In this paper, we evaluated the proposed system by simulation. In the simulation environment, rules are processed by a smart tap that relates to the action part of each rule. In addition, we implemented the proposed system as HEMS using smart taps.
Grounding explanations in evolving, diagnostic situations
NASA Technical Reports Server (NTRS)
Johannesen, Leila J.; Cook, Richard I.; Woods, David D.
1994-01-01
Certain fields of practice involve the management and control of complex dynamic systems. These include flight deck operations in commercial aviation, control of space systems, anesthetic management during surgery or chemical or nuclear process control. Fault diagnosis of these dynamic systems generally must occur with the monitored process on-line and in conjunction with maintaining system integrity.This research seeks to understand in more detail what it means for an intelligent system to function cooperatively, or as a 'team player' in complex, dynamic environments. The approach taken was to study human practitioners engaged in the management of a complex, dynamic process: anesthesiologists during neurosurgical operations. The investigation focused on understanding how team members cooperate in management and fault diagnosis and comparing this interaction to the situation with an Artificial Intelligence(AI) system that provides diagnoses and explanations. Of particular concern was to study the ways in which practitioners support one another in keeping aware of relevant information concerning the state of the monitored process and of the problem solving process.
Quality management of manufacturing process based on manufacturing execution system
NASA Astrophysics Data System (ADS)
Zhang, Jian; Jiang, Yang; Jiang, Weizhuo
2017-04-01
Quality control elements in manufacturing process are elaborated. And the approach of quality management of manufacturing process based on manufacturing execution system (MES) is discussed. The functions of MES for a microcircuit production line are introduced conclusively.
How to Take HRMS Process Management to the Next Level with Workflow Business Event System
NASA Technical Reports Server (NTRS)
Rajeshuni, Sarala; Yagubian, Aram; Kunamaneni, Krishna
2006-01-01
Oracle Workflow with the Business Event System offers a complete process management solution for enterprises to manage business processes cost-effectively. Using Workflow event messaging, event subscriptions, AQ Servlet and advanced queuing technologies, this presentation will demonstrate the step-by-step design and implementation of system solutions in order to integrate two dissimilar systems and establish communication remotely. As a case study, the presentation walks you through the process of propagating organization name changes in other applications that originated from the HRMS module without changing applications code. The solution can be applied to your particular business cases for streamlining or modifying business processes across Oracle and non-Oracle applications.
Lemmens, Karin; Strating, Mathilde; Huijsman, Robbert; Nieboer, Anna
2009-08-01
The aim of this exploratory study was to investigate to what extent primary care professionals are able to change their systems for delivering care to chronic obstructive pulmonary disease (COPD) patients and what professional and organizational factors are associated with the degree of process implementation. Quasi-experimental design with 1 year follow-up after intervention. Three regional COPD management programmes in the Netherlands, in which general practices cooperated with regional hospitals. All participating primary care professionals (n = 52). COPD management programme. Professional commitment, organizational context and degree of process implementation. Professionals significantly changed their systems for delivering care to COPD patients, namely self-management support, decision support, delivery system design and clinical information systems. Associations were found between organizational factors, professional commitment and changes in processes of care. Group culture and professional commitment appeared to be, to a moderate degree, predictors of process implementation. COPD management was effective; all processes improved significantly. Moreover, theoretically expected associations between organizational context and professional factors with the implementation of COPD management were indeed confirmed to some extent. Group culture and professional commitment are important facilitators.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, R.E.
1994-11-02
This document provides the software development plan for the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store, and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.
Integrating policy-based management and SLA performance monitoring
NASA Astrophysics Data System (ADS)
Liu, Tzong-Jye; Lin, Chin-Yi; Chang, Shu-Hsin; Yen, Meng-Tzu
2001-10-01
Policy-based management system provides the configuration capability for the system administrators to focus on the requirements of customers. The service level agreement performance monitoring mechanism helps system administrators to verify the correctness of policies. However, it is difficult for a device to process the policies directly because the policies are the management concept. This paper proposes a mechanism to decompose a policy into rules that can be efficiently processed by a device. Thus, the device may process the rule and collect the performance statistics information efficiently; and the policy-based management system may collect these performance statistics information and report the service-level agreement performance monitoring information to the system administrator. The proposed policy-based management system achieves both the policy configuration and service-level agreement performance monitoring requirements. A policy consists of a condition part and an action part. The condition part is a Boolean expression of a source host IP group, a destination host IP group, etc. The action part is the parameters of services. We say that an address group is compact if it only consists of a range of IP address that can be denoted by a pair of IP address and corresponding IP mask. If the condition part of a policy only consists of the compact address group, we say that the policy is a rule. Since a device can efficiently process a compact address and a system administrator prefers to define a range of IP address, the policy-based management system has to translate policy into rules and supplements the gaps between policy and rules. The proposed policy-based management system builds the relationships between VPN and policies, policy and rules. Since the system administrator wants to monitor the system performance information of VPNs and policies, the proposed policy-based management system downloads the relationships among VPNs, policies and rules to the SNMP agents. The SNMP agents build the management information base (MIB) of all VPNs, policies and rules according to the relationships obtained from the management server. Thus, the proposed policy-based management system may get all performance monitoring information of VPNs and policies from agents. The proposed policy-based manager achieves two goals: a) provide a management environment for the system administrator to configure their network only considering the policy requirement issues and b) let the device have only to process the packet and then collect the required performance information. These two things make the proposed management system satisfy both the user and device requirements.
ERIC Educational Resources Information Center
Mohammadi, Hadi
2014-01-01
Use of the Patch Vulnerability Management (PVM) process should be seriously considered for any networked computing system. The PVM process prevents the operating system (OS) and software applications from being attacked due to security vulnerabilities, which lead to system failures and critical data leakage. The purpose of this research is to…
Research on the Intensive Material Management System of Biomass Power Plant
NASA Astrophysics Data System (ADS)
Zhang, Ruosi; Hao, Tianyi; Li, Yunxiao; Zhang, Fangqing; Ding, Sheng
2017-05-01
In view of the universal problem which the material management is loose, and lack of standardization and interactive real-time in the biomass power plant, a system based on the method of intensive management is proposed in this paper to control the whole process of power plant material. By analysing the whole process of power plant material management and applying the Internet of Things, the method can simplify the management process. By making use of the resources to maximize and data mining, material utilization, circulation rate and quality control management can be improved. The system has been applied in Gaotang power plant, which raised the level of materials management and economic effectiveness greatly. It has an important significance for safe, cost-effective and highly efficient operation of the plant.
Manufacturing Bms/Iso System Review
NASA Technical Reports Server (NTRS)
Gomez, Yazmin
2004-01-01
The Quality Management System (QMS) is one that recognizes the need to continuously change and improve an organization s products and services as determined by system feedback, and corresponding management decisions. The purpose of a Quality Management System is to minimize quality variability of an organization's products and services. The optimal Quality Management System balances the need for an organization to maintain flexibility in the products and services it provides with the need for providing the appropriate level of discipline and control over the processes used to provide them. The goal of a Quality Management System is to ensure the quality of the products and services while consistently (through minimizing quality variability) meeting or exceeding customer expectations. The GRC Business Management System (BMS) is the foundation of the Center's ISO 9001:2000 registered quality system. ISO 9001 is a quality system model developed by the International Organization for Standardization. BMS supports and promote the Glenn Research Center Quality Policy and wants to ensure the customer satisfaction while also meeting quality standards. My assignment during this summer is to examine the manufacturing processes used to develop research hardware, which in most cases are one of a kind hardware, made with non conventional equipment and materials. During this process of observation I will make a determination, based on my observations of the hardware development processes the best way to meet customer requirements and at the same time achieve the GRC quality standards. The purpose of my task is to review the manufacturing processes identifying opportunities in which to optimize the efficiency of the processes and establish a plan for implementation and continuous improvement.
The Management and Demonstration System at Murray State University.
ERIC Educational Resources Information Center
Schroeder, Gary G.
The management system in use at the Murray State University Teacher Corps Project is described. The system uses management by objectives and the demonstration approach, and encourages managers to focus on the development and demonstration of ideas, processes, and structures. The system's operating concepts of time management and human resources…
Data management in pattern recognition and image processing systems
NASA Technical Reports Server (NTRS)
Zobrist, A. L.; Bryant, N. A.
1976-01-01
Data management considerations are important to any system which handles large volumes of data or where the manipulation of data is technically sophisticated. A particular problem is the introduction of image-formatted files into the mainstream of data processing application. This report describes a comprehensive system for the manipulation of image, tabular, and graphical data sets which involve conversions between the various data types. A key characteristic is the use of image processing technology to accomplish data management tasks. Because of this, the term 'image-based information system' has been adopted.
Process-driven information management system at a biotech company: concept and implementation.
Gobbi, Alberto; Funeriu, Sandra; Ioannou, John; Wang, Jinyi; Lee, Man-Ling; Palmer, Chris; Bamford, Bob; Hewitt, Robin
2004-01-01
While established pharmaceutical companies have chemical information systems in place to manage their compounds and the associated data, new startup companies need to implement these systems from scratch. Decisions made early in the design phase usually have long lasting effects on the expandability, maintenance effort, and costs associated with the information management system. Careful analysis of work and data flows, both inter- and intradepartmental, and identification of existing dependencies between activities are important. This knowledge is required to implement an information management system, which enables the research community to work efficiently by avoiding redundant registration and processing of data and by timely provision of the data whenever needed. This paper first presents the workflows existing at Anadys, then ARISE, the research information management system developed in-house at Anadys. ARISE was designed to support the preclinical drug discovery process and covers compound registration, analytical quality control, inventory management, high-throughput screening, lower throughput screening, and data reporting.
Due Process in Appraisal: A Quasi-Experiment in Procedural Justice.
ERIC Educational Resources Information Center
Taylor, M. Susan; And Others
1995-01-01
Extended research on procedural justice by examining effects of a due-process performance-appraisal system on (government) employees' and managers' reactions. Employee-management pairs were randomly assigned to either a due-process appraisal system or the existing one. Although due-process employees received lower evaluations, both employees and…
Building a competent health manager at district level: a grounded theory study from Eastern Uganda.
Tetui, Moses; Hurtig, Anna-Karin; Ekirpa-Kiracho, Elizabeth; Kiwanuka, Suzanne N; Coe, Anna-Britt
2016-11-21
Health systems in low-income countries are often characterized by poor health outcomes. While many reasons have been advanced to explain the persistently poor outcomes, management of the system has been found to play a key role. According to a WHO framework, the management of health systems is central to its ability to deliver needed health services. In this study, we examined how district managers in a rural setting in Uganda perceived existing approaches to strengthening management so as to provide a pragmatic and synergistic model for improving management capacity building. Twenty-two interviews were conducted with district level administrative and political managers, district level health managers and health facility managers to understand their perceptions and definitions of management and capacity building. Kathy Charmaz's constructive approach to grounded theory informed the data analysis process. An interative, dynamic and complex model with three sub-process of building a competent health manager was developed. A competent manager was understood as one who knew his/her roles, was well informed and was empowered to execute management functions. Professionalizing health managers which was viewed as the foundation, the use of engaging learning approaches as the inside contents and having a supportive work environment the frame of the model were the sub-processes involved in the model. The sub-processes were interconnected although the respondents agreed that having a supportive work environment was more time and effort intensive relative to the other two sub-processes. The model developed in our study makes four central contributions to enhance the WHO framework and the existing literature. First, it emphasizes management capacity building as an iterative, dynamic and complex process rather than a set of characteristics of competent managers. Second, our model suggests the need for professionalization of health managers at different levels of the health system. Third, our model underscores the benefits that could be accrued from the use of engaging learning approaches through prolonged and sustained processes that act in synergy. Lastly, our model postulates that different resource investments and a varied range of stakeholders could be required at each of the sub-processes.
Model medication management process in Australian nursing homes using business process modeling.
Qian, Siyu; Yu, Ping
2013-01-01
One of the reasons for end user avoidance or rejection to use health information systems is poor alignment of the system with healthcare workflow, likely causing by system designers' lack of thorough understanding about healthcare process. Therefore, understanding the healthcare workflow is the essential first step for the design of optimal technologies that will enable care staff to complete the intended tasks faster and better. The often use of multiple or "high risk" medicines by older people in nursing homes has the potential to increase medication error rate. To facilitate the design of information systems with most potential to improve patient safety, this study aims to understand medication management process in nursing homes using business process modeling method. The paper presents study design and preliminary findings from interviewing two registered nurses, who were team leaders in two nursing homes. Although there were subtle differences in medication management between the two homes, major medication management activities were similar. Further field observation will be conducted. Based on the data collected from observations, an as-is process model for medication management will be developed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ROOT, R.W.
1999-05-18
This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.
NASA Technical Reports Server (NTRS)
Stewart, Helen; Spence, Matt Chew; Holm, Jeanne; Koga, Dennis (Technical Monitor)
2001-01-01
This white paper explores how to increase the success and operation of critical, complex, national systems by effectively capturing knowledge management requirements within the federal acquisition process. Although we focus on aerospace flight systems, the principles outlined within may have a general applicability to other critical federal systems as well. Fundamental design deficiencies in federal, mission-critical systems have contributed to recent, highly visible system failures, such as the V-22 Osprey and the Delta rocket family. These failures indicate that the current mechanisms for knowledge management and risk management are inadequate to meet the challenges imposed by the rising complexity of critical systems. Failures of aerospace system operations and vehicles may have been prevented or lessened through utilization of better knowledge management and information management techniques.
1987-12-01
Normally, the system is decomposed into manageable parts with accurately defined interfaces. By rigidly controlling this process, aerospace companies have...Reference A CHANGE IN SYSTEM DESIGN EMPHASIS: FROM MACHINE TO MAN by M.L.Metersky and J.L.Ryder 16 SESSION I1 - MANAGING THE FUl URE SYSTEM DESIGN...PROCESS MANAGING ADVANCED AVIONIC SYSTEM DESIGN by P.Simons 17 ERGONOMIE PSYCHOSENSORIELLE DES COCKPITS, INTERET DES SYSTEMES INFORMATIQUES INTELLIGENTS
Systems Management of Air Force Standard Communications-Computer systems: There is a Better Way
1988-04-01
upgrade or replacement of systems. AFR 700-6, Information Systems Operation Management , AFR 700-7, Information Processing Center Opera- tions Management...and AFR 700-8, Telephone Systems Operation Management provide USAF guidance, policy and procedures governing this phase. 4 2. 800-Series Regulations
[Design of medical devices management system supporting full life-cycle process management].
Su, Peng; Zhong, Jianping
2014-03-01
Based on the analysis of the present status of medical devices management, this paper optimized management process, developed a medical devices management system with Web technologies. With information technology to dynamic master the use of state of the entire life-cycle of medical devices. Through the closed-loop management with pre-event budget, mid-event control and after-event analysis, improved the delicacy management level of medical devices, optimized asset allocation, promoted positive operation of devices.
2005-03-01
Materials management information systems (MMISs) incorporate information tools that hospitals can use to automate certain business processes, increase staff compliance with these processes, and identify opportunities for cost savings. Recently, there has been a push by hospital administration to purchase enterprise resource planning (ERP) systems, information systems that promise to integrate many more facets of healthcare business. We offer this article to help materials managers, administrators, and others involved with information system selection understand the changes that have taken place in materials management information systems, decide whether they need a new system and, if so, whether a stand-alone MMIS or an ERP system will be the best choice.
1988-09-01
could use the assistance of a microcomputer-based management information system . However, adequate system design and development requires an in-depth...understanding of the Equipment Management Section and the environment in which it functions were asked and answered. Then, a management information system was...designed, developed, and tested. The management information system is called the Equipment Management Information System (EMIS).
Akiyama, M
2007-01-01
The concept of our system is not only to manage material flows, but also to provide an integrated management resource, a means of correcting errors in medical treatment, and applications to EBM (evidence-based medicine) through the data mining of medical records. Prior to the development of this system, electronic processing systems in hospitals did a poor job of accurately grasping medical practice and medical material flows. With POAS (Point of Act System), hospital managers can solve the so-called, "man, money, material, and information" issues inherent in the costs of healthcare. The POAS system synchronizes with each department system, from finance and accounting, to pharmacy, to imaging, and allows information exchange. We can manage Man (Business Process), Material (Medical Materials and Medicine), Money (Expenditure for purchase and Receipt), and Information (Medical Records) completely by this system. Our analysis has shown that this system has a remarkable investment effect - saving over four million dollars per year - through cost savings in logistics and business process efficiencies. In addition, the quality of care has been improved dramatically while error rates have been reduced - nearly to zero in some cases.
Code of Federal Regulations, 2011 CFR
2011-04-01
.... Congestion management means the application of strategies to improve system performance and reliability by... SYSTEMS Management Systems § 500.109 CMS. (a) For purposes of this part, congestion means the level at... management system or process is a systematic and regionally accepted approach for managing congestion that...
Code of Federal Regulations, 2010 CFR
2010-04-01
.... Congestion management means the application of strategies to improve system performance and reliability by... SYSTEMS Management Systems § 500.109 CMS. (a) For purposes of this part, congestion means the level at... management system or process is a systematic and regionally accepted approach for managing congestion that...
Code of Federal Regulations, 2013 CFR
2013-04-01
... SYSTEMS Management Systems § 500.109 CMS. (a) For purposes of this part, congestion means the level at.... Congestion management means the application of strategies to improve system performance and reliability by... management system or process is a systematic and regionally accepted approach for managing congestion that...
Code of Federal Regulations, 2014 CFR
2014-04-01
... SYSTEMS Management Systems § 500.109 CMS. (a) For purposes of this part, congestion means the level at.... Congestion management means the application of strategies to improve system performance and reliability by... management system or process is a systematic and regionally accepted approach for managing congestion that...
Code of Federal Regulations, 2012 CFR
2012-04-01
... SYSTEMS Management Systems § 500.109 CMS. (a) For purposes of this part, congestion means the level at.... Congestion management means the application of strategies to improve system performance and reliability by... management system or process is a systematic and regionally accepted approach for managing congestion that...
NASA Technical Reports Server (NTRS)
Strand, Albert A.; Jackson, Darryl J.
1992-01-01
As the nation redefines priorities to deal with a rapidly changing world order, both government and industry require new approaches for oversight of management systems, particularly for high technology products. Declining defense budgets will lead to significant reductions in government contract management personnel. Concurrently, defense contractors are reducing administrative and overhead staffing to control costs. These combined pressures require bold approaches for the oversight of management systems. In the Spring of 1991, the DPRO and TRW created a Process Action Team (PAT) to jointly prepare a Performance Based Management (PBM) system titled Teamwork for Oversight of Processes and Systems (TOPS). The primary goal is implementation of a performance based management system based on objective data to review critical TRW processes with an emphasis on continuous improvement. The processes are: Finance and Business Systems, Engineering and Manufacturing Systems, Quality Assurance, and Software Systems. The team established a number of goals: delivery of quality products to contractual terms and conditions; ensure that TRW management systems meet government guidance and good business practices; use of objective data to measure critical processes; elimination of wasteful/duplicative reviews and audits; emphasis on teamwork--all efforts must be perceived to add value by both sides and decisions are made by consensus; and synergy and the creation of a strong working trust between TRW and the DPRO. TOPS permits the adjustment of oversight resources when conditions change or when TRW systems performance indicate either an increase or decrease in surveillance is appropriate. Monthly Contractor Performance Assessments (CPA) are derived from a summary of supporting system level and process-level ratings obtained from objective process-level data. Tiered, objective, data-driven metrics are highly successful in achieving a cooperative and effective method of measuring performance. The teamwork-based culture developed by TOPS proved an unequaled success in removing adversarial relationships and creating an atmosphere of continuous improvement in quality processes at TRW. The new working relationship does not decrease the responsibility or authority of the DPRO to ensure contract compliance and it permits both parties to work more effectively to improve total quality and reduce cost. By emphasizing teamwork in developing a stronger approach to efficient management of the defense industrial base TOPS is a singular success.
NASA Astrophysics Data System (ADS)
Strand, Albert A.; Jackson, Darryl J.
As the nation redefines priorities to deal with a rapidly changing world order, both government and industry require new approaches for oversight of management systems, particularly for high technology products. Declining defense budgets will lead to significant reductions in government contract management personnel. Concurrently, defense contractors are reducing administrative and overhead staffing to control costs. These combined pressures require bold approaches for the oversight of management systems. In the Spring of 1991, the DPRO and TRW created a Process Action Team (PAT) to jointly prepare a Performance Based Management (PBM) system titled Teamwork for Oversight of Processes and Systems (TOPS). The primary goal is implementation of a performance based management system based on objective data to review critical TRW processes with an emphasis on continuous improvement. The processes are: Finance and Business Systems, Engineering and Manufacturing Systems, Quality Assurance, and Software Systems. The team established a number of goals: delivery of quality products to contractual terms and conditions; ensure that TRW management systems meet government guidance and good business practices; use of objective data to measure critical processes; elimination of wasteful/duplicative reviews and audits; emphasis on teamwork--all efforts must be perceived to add value by both sides and decisions are made by consensus; and synergy and the creation of a strong working trust between TRW and the DPRO. TOPS permits the adjustment of oversight resources when conditions change or when TRW systems performance indicate either an increase or decrease in surveillance is appropriate. Monthly Contractor Performance Assessments (CPA) are derived from a summary of supporting system level and process-level ratings obtained from objective process-level data. Tiered, objective, data-driven metrics are highly successful in achieving a cooperative and effective method of measuring performance. The teamwork-based culture developed by TOPS proved an unequaled success in removing adversarial relationships and creating an atmosphere of continuous improvement in quality processes at TRW. The new working relationship does not decrease the responsibility or authority of the DPRO to ensure contract compliance and it permits both parties to work more effectively to improve total quality and reduce cost. By emphasizing teamwork in developing a stronger approach to efficient management of the defense industrial base TOPS is a singular success.
Fault management for data systems
NASA Technical Reports Server (NTRS)
Boyd, Mark A.; Iverson, David L.; Patterson-Hine, F. Ann
1993-01-01
Issues related to automating the process of fault management (fault diagnosis and response) for data management systems are considered. Substantial benefits are to be gained by successful automation of this process, particularly for large, complex systems. The use of graph-based models to develop a computer assisted fault management system is advocated. The general problem is described and the motivation behind choosing graph-based models over other approaches for developing fault diagnosis computer programs is outlined. Some existing work in the area of graph-based fault diagnosis is reviewed, and a new fault management method which was developed from existing methods is offered. Our method is applied to an automatic telescope system intended as a prototype for future lunar telescope programs. Finally, an application of our method to general data management systems is described.
An Information-Processing Model of Crisis Management.
ERIC Educational Resources Information Center
Egelhoff, William G.; Sen, Falguni
1992-01-01
Develops a contingency model for managing a variety of corporate crises. Views crisis management as an information-processing situation and organizations that must cope with crisis as information-processing systems. Attempts to fit appropriate information-processing mechanisms to different categories of crises. (PRA)
Wayne Elmore
1989-01-01
The management and recovery of degraded riparian systems is a major conservation issue. Presently there are many grazing management strategies being applied based on the name of the technique with little incorporation of basic stream processes. Managers must understand the exact workings of grazing strategies and the individual processes of each stream before...
NASA Technical Reports Server (NTRS)
Jellicorse, John J.; Rahman, Shamin A.
2016-01-01
NASA is currently developing the next generation crewed spacecraft and launch vehicle for exploration beyond earth orbit including returning to the Moon and making the transit to Mars. Managing the design integration of major hardware elements of a space transportation system is critical for overcoming both the technical and programmatic challenges in taking a complex system from concept to space operations. An established method of accomplishing this is formal interface management. In this paper we set forth an argument that the interface management process implemented by NASA between the Orion Multi-Purpose Crew Vehicle (MPCV) and the Space Launch System (SLS) achieves the Level 3 tier of the EIA 731.1 System Engineering Capability Model (SECM) for Generic Practices. We describe the relevant NASA systems and associated organizations, and define the EIA SECM Level 3 Generic Practices. We then provide evidence for our compliance with those practices. This evidence includes discussions of: NASA Systems Engineering Interface (SE) Management standard process and best practices; the tailoring of that process for implementation on the Orion to SLS interface; changes made over time to improve the tailored process, and; the opportunities to take the resulting lessons learned and propose improvements to our institutional processes and best practices. We compare this evidence against the practices to form the rationale for the declared SECM maturity level.
1986-09-01
differentiation between the systems. This study will investigate an appropriate Order Processing and Management Information System (OP&MIS) to link base-level...methodology: 1. Reviewed the current order processing and information model of the TUAF Logistics System. (centralized-manual model) 2. Described the...RDS program’s order processing and information system. (centralized-computerized model) 3. Described the order irocessing and information system of
Adaptive Management for Urban Watersheds: The Slavic Village Pilot Project
Adaptive management is an environmental management strategy that uses an iterative process of decision-making to reduce the uncertainty in environmental management via system monitoring. A central tenet of adaptive management is that management involves a learning process that ca...
Quicker, slicker, and better? An evaluation of a web-based human resource management system
NASA Astrophysics Data System (ADS)
Gibb, Stephen; McBride, Andrew
2001-10-01
This paper reviews the design and development of a web based Human Resource Management (HRM) system which has as its foundation a 'capability profiler' tool for analysing individual or team roles in organisations. This provides a foundation for managing a set of integrated activities in recruitment and selection, performance and career management, and training and development for individuals, teams, and whole organisations. The challenges of representing and processing information about the human side of organisation encountered in the design and implementation of such systems are evident. There is a combination of legal, practical, technical and philosophical issues to be faced in the processes of defining roles, selecting staff, monitoring and managing the performance of employees in the design and implementation of such systems. The strengths and weaknesses of web based systems in this context are evaluated. This evaluation highlights both the potential, given the evolution of broader Enterprise Resource Planning (ERP) systems and strategies in manufacturing, and concerns about the migration of HRM processes to such systems.
Generalized File Management System or Proto-DBMS?
ERIC Educational Resources Information Center
Braniff, Tom
1979-01-01
The use of a data base management system (DBMS) as opposed to traditional data processing is discussed. The generalized file concept is viewed as an entry level step to the DBMS. The transition process from one system to the other is detailed. (SF)
Reengineering a database for clinical trials management: lessons for system architects.
Brandt, C A; Nadkarni, P; Marenco, L; Karras, B T; Lu, C; Schacter, L; Fisk, J M; Miller, P L
2000-10-01
This paper describes the process of enhancing Trial/DB, a database system for clinical studies management. The system's enhancements have been driven by the need to maximize the effectiveness of developer personnel in supporting numerous and diverse users, of study designers in setting up new studies, and of administrators in managing ongoing studies. Trial/DB was originally designed to work over a local area network within a single institution, and basic architectural changes were necessary to make it work over the Internet efficiently as well as securely. Further, as its use spread to diverse communities of users, changes were made to let the processes of study design and project management adapt to the working styles of the principal investigators and administrators for each study. The lessons learned in the process should prove instructive for system architects as well as managers of electronic patient record systems.
Systems Engineering and Management Applications of ISO 9001:2015 for Government
NASA Technical Reports Server (NTRS)
Shepherd, Christena C.
2016-01-01
The manufacturing segment of the business world is busy assessing the impact of ISO 9001:2015, and updating their management systems to meet the required compliance date. What does the new revision mean for government agencies that deliver large engineering projects rather than mass production? In fact, the standard, especially the new revision, can be used quite readily for government agencies, or applied to specific projects, once it is understood in terms of the similarities with systems engineering and project management. From there it can be extrapolated to "mission realization" systems, and a Quality Management System (QMS) is a logical result that can bring order to processes and systems that likely already exist in some fashion. ISO 9001:2015 is less product-oriented than previous versions. It can be more broadly applied to public organizations as well as private; and to services (missions) as well as products. The emphasis on risk management in the revised standard provides the needed balance for weighing decisions with respect to cost, schedule, technical, safety, and regulatory compliance; so if this is not part of agency governance already, this is a good place to start, especially for large engineering projects. The Systems Engineering standard used for this analysis is from NASA's NPR 7123.1 NASA Systems Engineering Processes and Requirements; however, those who are more familiar with ISO/IEC 26702 Systems Engineering-application and management of the systems engineering process, or SAE/EIA 632 Processes for Engineering a System will also recognize the similarities. In reality, the QMS outlined by ISO 9001 reinforces the systems engineering processes, and serves to ensure that they are adequately implemented, although most of the ISO 9001 literature emphasizes the production and process aspects of the standard. Rather than beginning with ISO 9001and getting lost in the vocabulary, it is useful to begin with the systems engineering lifecycle. Identification of stakeholder expectations, identifying solutions, creating specific product or service designs, production of the product or service, delivery to the public, and the associated management, planning, and control processes, are a familiar place to begin thinking of the overall system of identifying, designing, and competing a project or mission. Lining up this lifecycle with the ISO requirements (see Figure 1) illustrates how a quality management system is concerned with the same processes, and provides a governance and assurance function. If implemented properly, there are cost savings resulting from less rework, repair, reprocessing, failures, misplaced documents, and similar types of deficiencies1. Starting with an organization's systems engineering processes allows the organization to use their own terminology for a QMS plan, and tailor the plan to their own project or organization, so that it is more easily developed, understood, and implemented.
Managing clinical integration in integrated delivery systems: a framework for action.
Young, D W; Barrett, D
1997-01-01
An integrated delivery system (IDS) in healthcare must coordinate patient care across multiple functions, activities, and operating units. To achieve this clinical integration, senior management confronts many challenges. This paper uses a cross-functional-process (CFP) framework to discuss these challenges. There are ten CFPs that fall into three categories: planning processes (strategy formulation, program adaptation, budget formulation), organizational processes (authority and influence, client management, conflict resolution, motivation, and cultural maintenance), and measurement and reporting processes (financial and programmatic). Each process typically spans several functional units. Senior management must consider how to improve both the functioning of each CFP, as well as its "fit" with the other nine. The result can be greater clinical integration, improved cost management, and more coordinated care for enrollees.
Management Information Systems, Planning, and Public Community Colleges.
ERIC Educational Resources Information Center
Ritch, Stephen W.; Munro, Robert J.
Management Information Systems (MIS), originally developed in the areas of accounting, management science, and computer processing, are now being applied to decision-making in educational settings. Definitions of MIS are numerous and often vague, but management systems (as distinguished from other information systems) should promote real-time…
Beck, Susan L; Eaton, Linda H; Echeverria, Christina; Mooney, Kathi H
2017-10-01
SymptomCare@Home, an integrated symptom monitoring and management system, was designed as part of randomized clinical trials to help patients with cancer who receive chemotherapy in ambulatory clinics and often experience significant symptoms at home. An iterative design process was informed by chronic disease management theory and features of assessment and clinical decision support systems used in other diseases. Key stakeholders participated in the design process: nurse scientists, clinical experts, bioinformatics experts, and computer programmers. Especially important was input from end users, patients, and nurse practitioners participating in a series of studies testing the system. The system includes both a patient and clinician interface and fully integrates two electronic subsystems: a telephone computer-linked interactive voice response system and a Web-based Decision Support-Symptom Management System. Key features include (1) daily symptom monitoring, (2) self-management coaching, (3) alerting, and (4) nurse practitioner follow-up. The nurse practitioner is distinctively positioned to provide assessment, education, support, and pharmacologic and nonpharmacologic interventions to intensify management of poorly controlled symptoms at home. SymptomCare@Home is a model for providing telehealth. The system facilitates using evidence-based guidelines as part of a comprehensive symptom management approach. The design process and system features can be applied to other diseases and conditions.
Congestion Management System Process Report
DOT National Transportation Integrated Search
1996-03-01
In January 1995, the Indianapolis Metropolitan Planning Organization with the help of an interagency Study Review Committee began the process of developing a Congestion Management System (CMS) Plan resulting in this report. This report documents the ...
NASA Technical Reports Server (NTRS)
Perera, Jeevan S.
2013-01-01
Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zaelen, Gunter van; Verheyen, Annick
2007-07-01
The management of radioactive waste in Belgium is undertaken by the national agency for radioactive waste and enriched fissile materials, ONDRAF/NIRAS, and its industrial partner Belgoprocess. ONDRAF/NIRAS has set up a management system designed to guarantee that the general public and the environment are protected against the potential hazards arising from radioactive waste. Belgoprocess is a private company, founded in 1984 and located in Dessel, Belgium. It is a subsidiary of ONDRAF/NIRAS and its activities focus on the safe processing and storage of radioactive waste. The management system of ONDRAF/NIRAS includes two aspects: a) an integrated system and b) anmore » acceptance system. The integrated system covers all aspects of management ranging from the origin of waste to its transport, processing, interim storage and long-term management. The safety of radioactive waste management not only depends on the quality of the design and construction of the processing, temporary storage or disposal infrastructure, but also on the quality of the waste accepted by ONDRAF/NIRAS. In order to be manage d safely, both in the short and the long term, the waste transferred to ONDRAF/NIRAS must meet certain specific requirements. To that end, ONDRAF/NIRAS has developed an acceptance system. (authors)« less
NASA Technical Reports Server (NTRS)
Dickinson, William B.
1995-01-01
An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.
[A medical consumable material management information system].
Tang, Guoping; Hu, Liang
2014-05-01
Medical consumables material is essential supplies to carry out medical work, which has a wide range of varieties and a large amount of usage. How to manage it feasibly and efficiently that has been a topic of concern to everyone. This article discussed about how to design a medical consumable material management information system that has a set of standardized processes, bring together medical supplies administrator, suppliers and clinical departments. Advanced management mode, enterprise resource planning (ERP) applied to the whole system design process.
42 CFR 456.709 - Retrospective drug use review.
Code of Federal Regulations, 2010 CFR
2010-10-01
... through the State's mechanized drug claims processing and information retrieval systems approved by CMS (that is, the Medicaid Management Information System (MMIS)) or an electronic drug claims processing... Claims Management System for Outpatient Drug Claims § 456.709 Retrospective drug use review. (a) General...
Quality data collection and management technology of aerospace complex product assembly process
NASA Astrophysics Data System (ADS)
Weng, Gang; Liu, Jianhua; He, Yongxi; Zhuang, Cunbo
2017-04-01
Aiming at solving problems of difficult management and poor traceability for discrete assembly process quality data, a data collection and management method is proposed which take the assembly process and BOM as the core. Data collection method base on workflow technology, data model base on BOM and quality traceability of assembly process is included in the method. Finally, assembly process quality data management system is developed and effective control and management of quality information for complex product assembly process is realized.
ERIC Educational Resources Information Center
Jewer, Jennifer; Evermann, Joerg
2015-01-01
Enterprise systems and business process management are the two key information technologies to integrate the functions of a modern business into a coherent and efficient system. While the benefits of these systems are easy to describe, students, especially those without business experience, have difficulty appreciating how these systems are used…
Planning and Resource Management in an Intelligent Automated Power Management System
NASA Technical Reports Server (NTRS)
Morris, Robert A.
1991-01-01
Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.
Management Information System Based on the Balanced Scorecard
ERIC Educational Resources Information Center
Kettunen, Juha; Kantola, Ismo
2005-01-01
Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…
Process Management inside ATLAS DAQ
NASA Astrophysics Data System (ADS)
Alexandrov, I.; Amorim, A.; Badescu, E.; Burckhart-Chromek, D.; Caprini, M.; Dobson, M.; Duval, P. Y.; Hart, R.; Jones, R.; Kazarov, A.; Kolos, S.; Kotov, V.; Liko, D.; Lucio, L.; Mapelli, L.; Mineev, M.; Moneta, L.; Nassiakou, M.; Pedro, L.; Ribeiro, A.; Roumiantsev, V.; Ryabov, Y.; Schweiger, D.; Soloviev, I.; Wolters, H.
2002-10-01
The Process Management component of the online software of the future ATLAS experiment data acquisition system is presented. The purpose of the Process Manager is to perform basic job control of the software components of the data acquisition system. It is capable of starting, stopping and monitoring the status of those components on the data acquisition processors independent of the underlying operating system. Its architecture is designed on the basis of a server client model using CORBA based communication. The server part relies on C++ software agent objects acting as an interface between the local operating system and client applications. Some of the major design challenges of the software agents were to achieve the maximum degree of autonomy possible, to create processes aware of dynamic conditions in their environment and with the ability to determine corresponding actions. Issues such as the performance of the agents in terms of time needed for process creation and destruction, the scalability of the system taking into consideration the final ATLAS configuration and minimizing the use of hardware resources were also of critical importance. Besides the details given on the architecture and the implementation, we also present scalability and performance tests results of the Process Manager system.
Managing Analysis Models in the Design Process
NASA Technical Reports Server (NTRS)
Briggs, Clark
2006-01-01
Design of large, complex space systems depends on significant model-based support for exploration of the design space. Integrated models predict system performance in mission-relevant terms given design descriptions and multiple physics-based numerical models. Both the design activities and the modeling activities warrant explicit process definitions and active process management to protect the project from excessive risk. Software and systems engineering processes have been formalized and similar formal process activities are under development for design engineering and integrated modeling. JPL is establishing a modeling process to define development and application of such system-level models.
23 CFR 973.204 - Management systems requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS HIGHWAYS MANAGEMENT... system; (2) A process to operate and maintain the management systems and their associated databases; (3... systems shall use databases with a common or coordinated reference system that can be used to geolocate...
23 CFR 973.204 - Management systems requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS HIGHWAYS MANAGEMENT... system; (2) A process to operate and maintain the management systems and their associated databases; (3... systems shall use databases with a common or coordinated reference system that can be used to geolocate...
Dissociated neural processing for decisions in managers and non-managers.
Caspers, Svenja; Heim, Stefan; Lucas, Marc G; Stephan, Egon; Fischer, Lorenz; Amunts, Katrin; Zilles, Karl
2012-01-01
Functional neuroimaging studies of decision-making so far mainly focused on decisions under uncertainty or negotiation with other persons. Dual process theory assumes that, in such situations, decision making relies on either a rapid intuitive, automated or a slower rational processing system. However, it still remains elusive how personality factors or professional requirements might modulate the decision process and the underlying neural mechanisms. Since decision making is a key task of managers, we hypothesized that managers, facing higher pressure for frequent and rapid decisions than non-managers, prefer the heuristic, automated decision strategy in contrast to non-managers. Such different strategies may, in turn, rely on different neural systems. We tested managers and non-managers in a functional magnetic resonance imaging study using a forced-choice paradigm on word-pairs. Managers showed subcortical activation in the head of the caudate nucleus, and reduced hemodynamic response within the cortex. In contrast, non-managers revealed the opposite pattern. With the head of the caudate nucleus being an initiating component for process automation, these results supported the initial hypothesis, hinting at automation during decisions in managers. More generally, the findings reveal how different professional requirements might modulate cognitive decision processing.
Dissociated Neural Processing for Decisions in Managers and Non-Managers
Caspers, Svenja; Heim, Stefan; Lucas, Marc G.; Stephan, Egon; Fischer, Lorenz; Amunts, Katrin; Zilles, Karl
2012-01-01
Functional neuroimaging studies of decision-making so far mainly focused on decisions under uncertainty or negotiation with other persons. Dual process theory assumes that, in such situations, decision making relies on either a rapid intuitive, automated or a slower rational processing system. However, it still remains elusive how personality factors or professional requirements might modulate the decision process and the underlying neural mechanisms. Since decision making is a key task of managers, we hypothesized that managers, facing higher pressure for frequent and rapid decisions than non-managers, prefer the heuristic, automated decision strategy in contrast to non-managers. Such different strategies may, in turn, rely on different neural systems. We tested managers and non-managers in a functional magnetic resonance imaging study using a forced-choice paradigm on word-pairs. Managers showed subcortical activation in the head of the caudate nucleus, and reduced hemodynamic response within the cortex. In contrast, non-managers revealed the opposite pattern. With the head of the caudate nucleus being an initiating component for process automation, these results supported the initial hypothesis, hinting at automation during decisions in managers. More generally, the findings reveal how different professional requirements might modulate cognitive decision processing. PMID:22927984
Code of Federal Regulations, 2011 CFR
2011-04-01
... Management Systems: Good Practices for Development and Implementation.” 3 An effective SMS should include, at... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT MANAGEMENT AND MONITORING SYSTEMS Management Systems § 500.108 SMS. An SMS is a systematic process with the goal of reducing the...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Management Systems: Good Practices for Development and Implementation.” 3 An effective SMS should include, at... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT MANAGEMENT AND MONITORING SYSTEMS Management Systems § 500.108 SMS. An SMS is a systematic process with the goal of reducing the...
Educational Management Information Systems: Progress and Prospectives.
ERIC Educational Resources Information Center
Evans, John A.
An educational management information system is a network of communication channels, information sources, computer storage and retrieval devices, and processing routines that provide data to educational managers at different levels, places, and times to facilitate decisionmaking. Management information systems should be differentiated from…
Russom, Diana; Ahmed, Amira; Gonzalez, Nancy; Alvarnas, Joseph; DiGiusto, David
2012-01-01
Regulatory requirements for the manufacturing of cell products for clinical investigation require a significant level of record-keeping, starting early in process development and continuing through to the execution and requisite follow-up of patients on clinical trials. Central to record-keeping is the management of documentation related to patients, raw materials, processes, assays and facilities. To support these requirements, we evaluated several laboratory information management systems (LIMS), including their cost, flexibility, regulatory compliance, ongoing programming requirements and ability to integrate with laboratory equipment. After selecting a system, we performed a pilot study to develop a user-configurable LIMS for our laboratory in support of our pre-clinical and clinical cell-production activities. We report here on the design and utilization of this system to manage accrual with a healthy blood-donor protocol, as well as manufacturing operations for the production of a master cell bank and several patient-specific stem cell products. The system was used successfully to manage blood donor eligibility, recruiting, appointments, billing and serology, and to provide annual accrual reports. Quality management reporting features of the system were used to capture, report and investigate process and equipment deviations that occurred during the production of a master cell bank and patient products. Overall the system has served to support the compliance requirements of process development and phase I/II clinical trial activities for our laboratory and can be easily modified to meet the needs of similar laboratories.
Low-temperature plasma technology as part of a closed-loop resource management system
NASA Technical Reports Server (NTRS)
Hetland, Melanie D.; Rindt, John R.; Jones, Frank A.; Sauer, Randal S.
1990-01-01
The results of this testing indicate that the agitated low-temperature plasma reactor system successfully converted carbon, hydrogen, and nitrogen into gaseous products at residence times that were about ten times shorter than those achieved by stationary processing. The inorganic matrix present was virtually unchanged by the processing technique. It was concluded that this processing technique is feasible for use as part of a close-looped processing resource management system.
Carvalho, Andre Luis Bonifácio de; Jesus, Washington Luiz Abreu de; Senra, Isabel Maria Vilas Boas
2017-04-01
This article examines the regionalization process in the Brazilian Health System, identifying frameworks and challenges of this process from critical dialogue on the subject, contextualized by the experience of the management system and in the light of an established theoretical debate in the last decade. We used the thematic content analysis of legal and documentary surveys of the regionalization process in SUS, collated by elements of the historical and political context in the period. As evidence, it appears that the regionalization process has been incremental decentralization/deconcentration of management and health actions and services. There are important challenges, particularly in relation to ensuring access and system governance structure, which contributes to critical thinking and construction of new perspectives by those who lead their implementation.
Understanding human management of automation errors
McBride, Sara E.; Rogers, Wendy A.; Fisk, Arthur D.
2013-01-01
Automation has the potential to aid humans with a diverse set of tasks and support overall system performance. Automated systems are not always reliable, and when automation errs, humans must engage in error management, which is the process of detecting, understanding, and correcting errors. However, this process of error management in the context of human-automation interaction is not well understood. Therefore, we conducted a systematic review of the variables that contribute to error management. We examined relevant research in human-automation interaction and human error to identify critical automation, person, task, and emergent variables. We propose a framework for management of automation errors to incorporate and build upon previous models. Further, our analysis highlights variables that may be addressed through design and training to positively influence error management. Additional efforts to understand the error management process will contribute to automation designed and implemented to support safe and effective system performance. PMID:25383042
Understanding human management of automation errors.
McBride, Sara E; Rogers, Wendy A; Fisk, Arthur D
2014-01-01
Automation has the potential to aid humans with a diverse set of tasks and support overall system performance. Automated systems are not always reliable, and when automation errs, humans must engage in error management, which is the process of detecting, understanding, and correcting errors. However, this process of error management in the context of human-automation interaction is not well understood. Therefore, we conducted a systematic review of the variables that contribute to error management. We examined relevant research in human-automation interaction and human error to identify critical automation, person, task, and emergent variables. We propose a framework for management of automation errors to incorporate and build upon previous models. Further, our analysis highlights variables that may be addressed through design and training to positively influence error management. Additional efforts to understand the error management process will contribute to automation designed and implemented to support safe and effective system performance.
System safety management lessons learned from the US Army acquisition process
DOE Office of Scientific and Technical Information (OSTI.GOV)
Piatt, J.A.
1989-05-01
The Assistant Secretary of the Army for Research, Development and Acquisition directed the Army Safety Center to provide an audit of the causes of accidents and safety of use restrictions on recently fielded systems by tracking residual hazards back through the acquisition process. The objective was to develop lessons learned'' that could be applied to the acquisition process to minimize mishaps in fielded systems. System safety management lessons learned are defined as Army practices or policies, derived from past successes and failures, that are expected to be effective in eliminating or reducing specific systemic causes of residual hazards. They aremore » broadly applicable and supportive of the Army structure and acquisition objectives. Pacific Northwest Laboratory (PNL) was given the task of conducting an independent, objective appraisal of the Army's system safety program in the context of the Army materiel acquisition process by focusing on four fielded systems which are products of that process. These systems included the Apache helicopter, the Bradley Fighting Vehicle (BFV), the Tube Launched, Optically Tracked, Wire Guided (TOW) Missile and the High Mobility Multipurpose Wheeled Vehicle (HMMWV). The objective of this study was to develop system safety management lessons learned associated with the acquisition process. The first step was to identify residual hazards associated with the selected systems. Since it was impossible to track all residual hazards through the acquisition process, certain well-known, high visibility hazards were selected for detailed tracking. These residual hazards illustrate a variety of systemic problems. Systemic or process causes were identified for each residual hazard and analyzed to determine why they exist. System safety management lessons learned were developed to address related systemic causal factors. 29 refs., 5 figs.« less
A characterization of workflow management systems for extreme-scale applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ferreira da Silva, Rafael; Filgueira, Rosa; Pietri, Ilia
We present that the automation of the execution of computational tasks is at the heart of improving scientific productivity. Over the last years, scientific workflows have been established as an important abstraction that captures data processing and computation of large and complex scientific applications. By allowing scientists to model and express entire data processing steps and their dependencies, workflow management systems relieve scientists from the details of an application and manage its execution on a computational infrastructure. As the resource requirements of today’s computational and data science applications that process vast amounts of data keep increasing, there is a compellingmore » case for a new generation of advances in high-performance computing, commonly termed as extreme-scale computing, which will bring forth multiple challenges for the design of workflow applications and management systems. This paper presents a novel characterization of workflow management systems using features commonly associated with extreme-scale computing applications. We classify 15 popular workflow management systems in terms of workflow execution models, heterogeneous computing environments, and data access methods. Finally, the paper also surveys workflow applications and identifies gaps for future research on the road to extreme-scale workflows and management systems.« less
A characterization of workflow management systems for extreme-scale applications
Ferreira da Silva, Rafael; Filgueira, Rosa; Pietri, Ilia; ...
2017-02-16
We present that the automation of the execution of computational tasks is at the heart of improving scientific productivity. Over the last years, scientific workflows have been established as an important abstraction that captures data processing and computation of large and complex scientific applications. By allowing scientists to model and express entire data processing steps and their dependencies, workflow management systems relieve scientists from the details of an application and manage its execution on a computational infrastructure. As the resource requirements of today’s computational and data science applications that process vast amounts of data keep increasing, there is a compellingmore » case for a new generation of advances in high-performance computing, commonly termed as extreme-scale computing, which will bring forth multiple challenges for the design of workflow applications and management systems. This paper presents a novel characterization of workflow management systems using features commonly associated with extreme-scale computing applications. We classify 15 popular workflow management systems in terms of workflow execution models, heterogeneous computing environments, and data access methods. Finally, the paper also surveys workflow applications and identifies gaps for future research on the road to extreme-scale workflows and management systems.« less
Policy implications in developing a land use management information systems
NASA Technical Reports Server (NTRS)
Landini, A. J.
1975-01-01
The current land use map for the city of Los Angeles was developed by the guesstimation process and provides single stage information for each level in the critical geographical hierarchy for land use planning management. Processing and incorporation of LANDSAT data in the land use information system requires special funding; however, computergraphic maps are able to provide a viable information system for city planning and management.
NASA Technical Reports Server (NTRS)
1973-01-01
Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.
Integrating automated support for a software management cycle into the TAME system
NASA Technical Reports Server (NTRS)
Sunazuka, Toshihiko; Basili, Victor R.
1989-01-01
Software managers are interested in the quantitative management of software quality, cost and progress. An integrated software management methodology, which can be applied throughout the software life cycle for any number purposes, is required. The TAME (Tailoring A Measurement Environment) methodology is based on the improvement paradigm and the goal/question/metric (GQM) paradigm. This methodology helps generate a software engineering process and measurement environment based on the project characteristics. The SQMAR (software quality measurement and assurance technology) is a software quality metric system and methodology applied to the development processes. It is based on the feed forward control principle. Quality target setting is carried out before the plan-do-check-action activities are performed. These methodologies are integrated to realize goal oriented measurement, process control and visual management. A metric setting procedure based on the GQM paradigm, a management system called the software management cycle (SMC), and its application to a case study based on NASA/SEL data are discussed. The expected effects of SMC are quality improvement, managerial cost reduction, accumulation and reuse of experience, and a highly visual management reporting system.
Resource Management for Distributed Parallel Systems
NASA Technical Reports Server (NTRS)
Neuman, B. Clifford; Rao, Santosh
1993-01-01
Multiprocessor systems should exist in the the larger context of distributed systems, allowing multiprocessor resources to be shared by those that need them. Unfortunately, typical multiprocessor resource management techniques do not scale to large networks. The Prospero Resource Manager (PRM) is a scalable resource allocation system that supports the allocation of processing resources in large networks and multiprocessor systems. To manage resources in such distributed parallel systems, PRM employs three types of managers: system managers, job managers, and node managers. There exist multiple independent instances of each type of manager, reducing bottlenecks. The complexity of each manager is further reduced because each is designed to utilize information at an appropriate level of abstraction.
NASA Astrophysics Data System (ADS)
Huang, Hong-bin; Liu, Wei-ping; Chen, Shun-er; Zheng, Liming
2005-02-01
A new type of CATV network management system developed by universal MCU, which supports SNMP, is proposed in this paper. From the point of view in both hardware and software, the function and method of every modules inside the system, which include communications in the physical layer, protocol process, data process, and etc, are analyzed. In our design, the management system takes IP MAN as data transmission channel and every controlled object in the management structure has a SNMP agent. In the SNMP agent developed, there are four function modules, including physical layer communication module, protocol process module, internal data process module and MIB management module. In the paper, the structure and function of every module are designed and demonstrated while the related hardware circuit, software flow as well as the experimental results are tested. Furthermore, by introducing RTOS into the software programming, the universal MCU procedure can conducts such multi-thread management as fast Ethernet controller driving, TCP/IP process, serial port signal monitoring and so on, which greatly improves efficiency of CPU.
ERIC Educational Resources Information Center
McDonald, Joseph
1986-01-01
Focusing on management decisions in academic libraries, this article compares management information systems (MIS) with decision support systems (DSS) and discusses the decision-making process, information needs of library managers, sources of data, reasons for choosing microcomputer, preprogrammed application software, prototyping a system, and…
Systemic safety project selection tool.
DOT National Transportation Integrated Search
2013-07-01
"The Systemic Safety Project Selection Tool presents a process for incorporating systemic safety planning into traditional safety management processes. The Systemic Tool provides a step-by-step process for conducting systemic safety analysis; conside...
Open source cardiology electronic health record development for DIGICARDIAC implementation
NASA Astrophysics Data System (ADS)
Dugarte, Nelson; Medina, Rubén.; Huiracocha, Lourdes; Rojas, Rubén.
2015-12-01
This article presents the development of a Cardiology Electronic Health Record (CEHR) system. Software consists of a structured algorithm designed under Health Level-7 (HL7) international standards. Novelty of the system is the integration of high resolution ECG (HRECG) signal acquisition and processing tools, patient information management tools and telecardiology tools. Acquisition tools are for management and control of the DIGICARDIAC electrocardiograph functions. Processing tools allow management of HRECG signal analysis searching for indicative patterns of cardiovascular pathologies. Telecardiology tools incorporation allows system communication with other health care centers decreasing access time to the patient information. CEHR system was completely developed using open source software. Preliminary results of process validation showed the system efficiency.
On the management and processing of earth resources information
NASA Technical Reports Server (NTRS)
Skinner, C. W.; Gonzalez, R. C.
1973-01-01
The basic concepts of a recently completed large-scale earth resources information system plan are reported. Attention is focused throughout the paper on the information management and processing requirements. After the development of the principal system concepts, a model system for implementation at the state level is discussed.
5 CFR 9701.222 - Reconsideration of classification decisions.
Code of Federal Regulations, 2012 CFR
2012-01-01
... RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.222...
5 CFR 9701.222 - Reconsideration of classification decisions.
Code of Federal Regulations, 2013 CFR
2013-01-01
... RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.222...
5 CFR 9701.222 - Reconsideration of classification decisions.
Code of Federal Regulations, 2014 CFR
2014-01-01
... RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.222...
5 CFR 9701.222 - Reconsideration of classification decisions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.222...
Structured decision making as a proactive approach to dealing with sea level rise in Florida
Martin, Julien; Fackler, Paul L.; Nichols, James D.; Lubow, Bruce C.; Eaton, Mitchell J.; Runge, Michael C.; Stith, Bradley M.; Langtimm, Catherine A.
2011-01-01
Sea level rise (SLR) projections along the coast of Florida present an enormous challenge for management and conservation over the long term. Decision makers need to recognize and adopt strategies to adapt to the potentially detrimental effects of SLR. Structured decision making (SDM) provides a rigorous framework for the management of natural resources. The aim of SDM is to identify decisions that are optimal with respect to management objectives and knowledge of the system. Most applications of SDM have assumed that the managed systems are governed by stationary processes. However, in the context of SLR it may be necessary to acknowledge that the processes underlying managed systems may be non-stationary, such that systems will be continuously changing. Therefore, SLR brings some unique considerations to the application of decision theory for natural resource management. In particular, SLR is expected to affect each of the components of SDM. For instance, management objectives may have to be reconsidered more frequently than under more stable conditions. The set of potential actions may also have to be adapted over time as conditions change. Models have to account for the non-stationarity of the modeled system processes. Each of the important sources of uncertainty in decision processes is expected to be exacerbated by SLR. We illustrate our ideas about adaptation of natural resource management to SLR by modeling a non-stationary system using a numerical example. We provide additional examples of an SDM approach for managing species that may be affected by SLR, with a focus on the endangered Florida manatee.
The Network Configuration of an Object Relational Database Management System
NASA Technical Reports Server (NTRS)
Diaz, Philip; Harris, W. C.
2000-01-01
The networking and implementation of the Oracle Database Management System (ODBMS) requires developers to have knowledge of the UNIX operating system as well as all the features of the Oracle Server. The server is an object relational database management system (DBMS). By using distributed processing, processes are split up between the database server and client application programs. The DBMS handles all the responsibilities of the server. The workstations running the database application concentrate on the interpretation and display of data.
Integrated Computer System of Management in Logistics
NASA Astrophysics Data System (ADS)
Chwesiuk, Krzysztof
2011-06-01
This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.
ERIC Educational Resources Information Center
Weinberger, Elizabeth
The document contains optical scannable forms for some of the instruments in the Input and Process Batteries, and guidelines for administration of the instruments in the Input Batteries of the Management Information System for Occupational Education (MISOE) Sample Data Systems. Input information describes the characteristics of the students at…
Digital processing of mesoscale analysis and space sensor data
NASA Technical Reports Server (NTRS)
Hickey, J. S.; Karitani, S.
1985-01-01
The mesoscale analysis and space sensor (MASS) data management and analysis system on the research computer system is presented. The MASS data base management and analysis system was implemented on the research computer system which provides a wide range of capabilities for processing and displaying large volumes of conventional and satellite derived meteorological data. The research computer system consists of three primary computers (HP-1000F, Harris/6, and Perkin-Elmer 3250), each of which performs a specific function according to its unique capabilities. The overall tasks performed concerning the software, data base management and display capabilities of the research computer system in terms of providing a very effective interactive research tool for the digital processing of mesoscale analysis and space sensor data is described.
This procedure identifies the specific requirements, processes and supporting documents EPA uses to electronically manage rulemaking and other docketed records in the Federal Docket Management System (FDMS).
The Design of a High Performance Earth Imagery and Raster Data Management and Processing Platform
NASA Astrophysics Data System (ADS)
Xie, Qingyun
2016-06-01
This paper summarizes the general requirements and specific characteristics of both geospatial raster database management system and raster data processing platform from a domain-specific perspective as well as from a computing point of view. It also discusses the need of tight integration between the database system and the processing system. These requirements resulted in Oracle Spatial GeoRaster, a global scale and high performance earth imagery and raster data management and processing platform. The rationale, design, implementation, and benefits of Oracle Spatial GeoRaster are described. Basically, as a database management system, GeoRaster defines an integrated raster data model, supports image compression, data manipulation, general and spatial indices, content and context based queries and updates, versioning, concurrency, security, replication, standby, backup and recovery, multitenancy, and ETL. It provides high scalability using computer and storage clustering. As a raster data processing platform, GeoRaster provides basic operations, image processing, raster analytics, and data distribution featuring high performance computing (HPC). Specifically, HPC features include locality computing, concurrent processing, parallel processing, and in-memory computing. In addition, the APIs and the plug-in architecture are discussed.
NASA Technical Reports Server (NTRS)
Shipman, D. L.
1972-01-01
The development of a model to simulate the information system of a program management type of organization is reported. The model statistically determines the following parameters: type of messages, destinations, delivery durations, type processing, processing durations, communication channels, outgoing messages, and priorites. The total management information system of the program management organization is considered, including formal and informal information flows and both facilities and equipment. The model is written in General Purpose System Simulation 2 computer programming language for use on the Univac 1108, Executive 8 computer. The model is simulated on a daily basis and collects queue and resource utilization statistics for each decision point. The statistics are then used by management to evaluate proposed resource allocations, to evaluate proposed changes to the system, and to identify potential problem areas. The model employs both empirical and theoretical distributions which are adjusted to simulate the information flow being studied.
A systems engineering management approach to resource management applications
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda Shaller
1989-01-01
The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.
NASA Technical Reports Server (NTRS)
Perera, Jeevan S.
2011-01-01
Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.
Land management: data availability and process understanding for global change studies.
Erb, Karl-Heinz; Luyssaert, Sebastiaan; Meyfroidt, Patrick; Pongratz, Julia; Don, Axel; Kloster, Silvia; Kuemmerle, Tobias; Fetzel, Tamara; Fuchs, Richard; Herold, Martin; Haberl, Helmut; Jones, Chris D; Marín-Spiotta, Erika; McCallum, Ian; Robertson, Eddy; Seufert, Verena; Fritz, Steffen; Valade, Aude; Wiltshire, Andrew; Dolman, Albertus J
2017-02-01
In the light of daunting global sustainability challenges such as climate change, biodiversity loss and food security, improving our understanding of the complex dynamics of the Earth system is crucial. However, large knowledge gaps related to the effects of land management persist, in particular those human-induced changes in terrestrial ecosystems that do not result in land-cover conversions. Here, we review the current state of knowledge of ten common land management activities for their biogeochemical and biophysical impacts, the level of process understanding and data availability. Our review shows that ca. one-tenth of the ice-free land surface is under intense human management, half under medium and one-fifth under extensive management. Based on our review, we cluster these ten management activities into three groups: (i) management activities for which data sets are available, and for which a good knowledge base exists (cropland harvest and irrigation); (ii) management activities for which sufficient knowledge on biogeochemical and biophysical effects exists but robust global data sets are lacking (forest harvest, tree species selection, grazing and mowing harvest, N fertilization); and (iii) land management practices with severe data gaps concomitant with an unsatisfactory level of process understanding (crop species selection, artificial wetland drainage, tillage and fire management and crop residue management, an element of crop harvest). Although we identify multiple impediments to progress, we conclude that the current status of process understanding and data availability is sufficient to advance with incorporating management in, for example, Earth system or dynamic vegetation models in order to provide a systematic assessment of their role in the Earth system. This review contributes to a strategic prioritization of research efforts across multiple disciplines, including land system research, ecological research and Earth system modelling. © 2016 John Wiley & Sons Ltd.
Worklist handling in workflow-enabled radiological application systems
NASA Astrophysics Data System (ADS)
Wendler, Thomas; Meetz, Kirsten; Schmidt, Joachim; von Berg, Jens
2000-05-01
For the next generation integrated information systems for health care applications, more emphasis has to be put on systems which, by design, support the reduction of cost, the increase inefficiency and the improvement of the quality of services. A substantial contribution to this will be the modeling. optimization, automation and enactment of processes in health care institutions. One of the perceived key success factors for the system integration of processes will be the application of workflow management, with workflow management systems as key technology components. In this paper we address workflow management in radiology. We focus on an important aspect of workflow management, the generation and handling of worklists, which provide workflow participants automatically with work items that reflect tasks to be performed. The display of worklists and the functions associated with work items are the visible part for the end-users of an information system using a workflow management approach. Appropriate worklist design and implementation will influence user friendliness of a system and will largely influence work efficiency. Technically, in current imaging department information system environments (modality-PACS-RIS installations), a data-driven approach has been taken: Worklist -- if present at all -- are generated from filtered views on application data bases. In a future workflow-based approach, worklists will be generated by autonomous workflow services based on explicit process models and organizational models. This process-oriented approach will provide us with an integral view of entire health care processes or sub- processes. The paper describes the basic mechanisms of this approach and summarizes its benefits.
High-volume workflow management in the ITN/FBI system
NASA Astrophysics Data System (ADS)
Paulson, Thomas L.
1997-02-01
The Identification Tasking and Networking (ITN) Federal Bureau of Investigation system will manage the processing of more than 70,000 submissions per day. The workflow manager controls the routing of each submission through a combination of automated and manual processing steps whose exact sequence is dynamically determined by the results at each step. For most submissions, one or more of the steps involve the visual comparison of fingerprint images. The ITN workflow manager is implemented within a scaleable client/server architecture. The paper describes the key aspects of the ITN workflow manager design which allow the high volume of daily processing to be successfully accomplished.
Reengineering outcomes management: an integrated approach to managing data, systems, and processes.
Neuman, K; Malloch, K; Ruetten, V
1999-01-01
The integration of outcomes management into organizational reengineering projects is often overlooked or marginalized in proportion to the entire project. Incorporation of an integrated outcomes management program strengthens the overall quality of reengineering projects and enhances their sustainability. This article presents a case study in which data, systems, and processes were reengineered to form an effective Outcomes Management program as a component of the organization's overall project. The authors describe eight steps to develop and monitor an integrated outcomes management program. An example of an integrated report format is included.
Computer Aided Management for Information Processing Projects.
ERIC Educational Resources Information Center
Akman, Ibrahim; Kocamustafaogullari, Kemal
1995-01-01
Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…
NASA Technical Reports Server (NTRS)
Isenberg, J. M.; Southall, J. W.
1979-01-01
The Integrated Programs for Aerospace Vehicle Design (IPAD) is a computing system to support company-wide design information processing. This document presents a brief description of the management system used to direct and control a product-oriented program. This document, together with the reference design process (CR 2981) and the manufacture interactions with the design process (CR 2982), comprises the reference information that forms the basis for specifying IPAD system requirements.
Going from "paper and pen" to ICT systems: Perspectives on managing the change process.
Andersson Marchesoni, Maria; Axelsson, Karin; Fältholm, Ylva; Lindberg, Inger
2017-03-01
Lack of participation from staff when developing information and communication technologies (ICT) has been shown to lead to negative consequences and might be one explanation for failure. Management during development processes has rarely been empirically studied, especially when introducing ICT systems in a municipality context. To describe and interpret experiences of the management during change processes where ICT was introduced among staff and managers in elderly care. A qualitative interpretive method was chosen for this study and content analysis for analyzing the interviews. "Clear focus-unclear process" demonstrated that focus on ICT solutions was clear but the process of introducing the ICT was not. "First-line managers receiving a system of support" gave a picture of the first-line manager as not playing an active part in the projects. First-line managers and staff described "Low power to influence" when realizing that for some reasons, they had not contributed in the change projects. "Low confirmation" represented the previous and present feelings of staff not being listened to. Lastly, "Reciprocal understanding" pictures how first-line managers and staff, although having some expectations on each other, understood each other's positions. Empowerment could be useful in creating an organization where critical awareness and reflection over daily practice becomes a routine.
Applications for radio-frequency identification technology in the perioperative setting.
Zhao, Tiyu; Zhang, Xiaoxiang; Zeng, Lili; Xia, Shuyan; Hinton, Antentor Othrell; Li, Xiuyun
2014-06-01
We implemented a two-year project to develop a security-gated management system for the perioperative setting using radio-frequency identification (RFID) technology to enhance the management efficiency of the OR. We installed RFID readers beside the entrances to the OR and changing areas to receive and process signals from the RFID tags that we sewed into surgical scrub attire and shoes. The system also required integrating automatic access control panels, computerized lockers, light-emitting diode (LED) information screens, wireless networks, and an information system. By doing this, we are able to control the flow of personnel and materials more effectively, reduce OR costs, optimize the registration and attire-changing process for personnel, and improve management efficiency. We also anticipate this system will improve patient safety by reducing the risk of surgical site infection. Application of security-gated management systems is an important and effective way to help ensure a clean, convenient, and safe management process to manage costs in the perioperative area and promote patient safety. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.
Automated management for pavement inspection system (AMPIS)
NASA Astrophysics Data System (ADS)
Chung, Hung Chi; Girardello, Roberto; Soeller, Tony; Shinozuka, Masanobu
2003-08-01
An automated in-situ road surface distress surveying and management system, AMPIS, has been developed on the basis of video images within the framework of GIS software. Video image processing techniques are introduced to acquire, process and analyze the road surface images obtained from a moving vehicle. ArcGIS platform is used to integrate the routines of image processing and spatial analysis in handling the full-scale metropolitan highway surface distress detection and data fusion/management. This makes it possible to present user-friendly interfaces in GIS and to provide efficient visualizations of surveyed results not only for the use of transportation engineers to manage road surveying documentations, data acquisition, analysis and management, but also for financial officials to plan maintenance and repair programs and further evaluate the socio-economic impacts of highway degradation and deterioration. A review performed in this study on fundamental principle of Pavement Management System (PMS) and its implementation indicates that the proposed approach of using GIS concept and its tools for PMS application will reshape PMS into a new information technology-based system providing a convenient and efficient pavement inspection and management.
GIS-based automated management of highway surface crack inspection system
NASA Astrophysics Data System (ADS)
Chung, Hung-Chi; Shinozuka, Masanobu; Soeller, Tony; Girardello, Roberto
2004-07-01
An automated in-situ road surface distress surveying and management system, AMPIS, has been developed on the basis of video images within the framework of GIS software. Video image processing techniques are introduced to acquire, process and analyze the road surface images obtained from a moving vehicle. ArcGIS platform is used to integrate the routines of image processing and spatial analysis in handling the full-scale metropolitan highway surface distress detection and data fusion/management. This makes it possible to present user-friendly interfaces in GIS and to provide efficient visualizations of surveyed results not only for the use of transportation engineers to manage road surveying documentations, data acquisition, analysis and management, but also for financial officials to plan maintenance and repair programs and further evaluate the socio-economic impacts of highway degradation and deterioration. A review performed in this study on fundamental principle of Pavement Management System (PMS) and its implementation indicates that the proposed approach of using GIS concept and its tools for PMS application will reshape PMS into a new information technology-based system that can provide convenient and efficient pavement inspection and management.
Does recyclable separation reduce the cost of municipal waste management in Japan?
Chifari, Rosaria; Lo Piano, Samuele; Matsumoto, Shigeru; Tasaki, Tomohiro
2017-02-01
Municipal solid waste (MSW) management is a system involving multiple sub-systems that typically require demanding inputs, materials and resources to properly process generated waste throughput. For this reason, MSW management is generally one of the most expensive services provided by municipalities. In this paper, we analyze the Japanese MSW management system and estimate the cost elasticity with respect to the waste volumes at three treatment stages: collection, processing, and disposal. Although we observe economies of scale at all three stages, the collection cost is less elastic than the disposal cost. We also examine whether source separation at home affects the cost of MSW management. The empirical results show that the separate collection of the recyclable fraction leads to reduced processing costs at intermediate treatment facilities, but does not change the overall waste management cost. Our analysis also reveals that the cost of waste management systems decreases when the service is provided by private companies through a public tender. The cost decreases even more when the service is performed under the coordination of adjacent municipalities. Copyright © 2017 Elsevier Ltd. All rights reserved.
Ontological Model of Business Process Management Systems
NASA Astrophysics Data System (ADS)
Manoilov, G.; Deliiska, B.
2008-10-01
The activities which constitute business process management (BPM) can be grouped into five categories: design, modeling, execution, monitoring and optimization. Dedicated software packets for business process management system (BPMS) are available on the market. But the efficiency of its exploitation depends on used ontological model in the development time and run time of the system. In the article an ontological model of BPMS in area of software industry is investigated. The model building is preceded by conceptualization of the domain and taxonomy of BPMS development. On the base of the taxonomy an simple online thesaurus is created.
Microbiological performance of a food safety management system in a food service operation.
Lahou, E; Jacxsens, L; Daelman, J; Van Landeghem, F; Uyttendaele, M
2012-04-01
The microbiological performance of a food safety management system in a food service operation was measured using a microbiological assessment scheme as a vertical sampling plan throughout the production process, from raw materials to final product. The assessment scheme can give insight into the microbiological contamination and the variability of a production process and pinpoint bottlenecks in the food safety management system. Three production processes were evaluated: a high-risk sandwich production process (involving raw meat preparation), a medium-risk hot meal production process (starting from undercooked raw materials), and a low-risk hot meal production process (reheating in a bag). Microbial quality parameters, hygiene indicators, and relevant pathogens (Listeria monocytogenes, Salmonella, Bacillus cereus, and Escherichia coli O157) were in accordance with legal criteria and/or microbiological guidelines, suggesting that the food safety management system was effective. High levels of total aerobic bacteria (>3.9 log CFU/50 cm(2)) were noted occasionally on gloves of food handlers and on food contact surfaces, especially in high contamination areas (e.g., during handling of raw material, preparation room). Core control activities such as hand hygiene of personnel and cleaning and disinfection (especially in highly contaminated areas) were considered points of attention. The present sampling plan was used to produce an overall microbiological profile (snapshot) to validate the food safety management system in place.
Evaluating the effects of ecosystem management: a case study in a Missouri Ozark forest
Wendy K. Gram; Victoria L. Sork; Robert J. Marquis; Rochelle B. Renken; Richard L. Clawson; et. al.
2002-01-01
Many federal and state management agencies have shifted from commodity-based management systems to multiple resource-based management systems that emphasize sustainable ecosystem management. Long-term sustainability of ecosystem functions and processes is at the core of ecosystem management, but a blueprint for assessing sustainability under different management...
Distributed Information System Development: Review of Some Management Issues
NASA Astrophysics Data System (ADS)
Mishra, Deepti; Mishra, Alok
Due to the proliferation of the Internet and globalization, distributed information system development is becoming popular. In this paper we have reviewed some significant management issues like process management, project management, requirements management and knowledge management issues which have received much attention in distributed development perspective. In this literature review we found that areas like quality and risk management issues could get only scant attention in distributed information system development.
Innovation in managing the referral process at a Canadian pediatric hospital.
MacGregor, Daune; Parker, Sandra; MacMillan, Sharon; Blais, Irene; Wong, Eugene; Robertson, Chris J; Bruce-Barrett, Cindy
2009-01-01
The provision of timely and optimal patient care is a priority in pediatric academic health science centres. Timely access to care is optimized when there is an efficient and consistent referral system in place. In order to improve the patient referral process and, therefore, access to care, an innovative web-based system was developed and implemented. The Ambulatory Referral Management System enables the electronic routing for submission, review, triage and management of all outpatient referrals. The implementation of this system has provided significant metrics that have informed how processes can be improved to increase access to care. Use of the system has improved efficiency in the referral process and has reduced the work associated with the previous paper-based referral system. It has also enhanced communication between the healthcare provider and the patient and family and has improved the security and confidentiality of patient information management. Referral guidelines embedded within the system have helped to ensure that referrals are more complete and that the patient being referred meets the criteria for assessment and treatment in an ambulatory setting. The system calculates and reports on wait times, as well as other measures.
Filling of orbital fluid management systems
NASA Technical Reports Server (NTRS)
Merino, F.; Blatt, M. H.; Thies, N. C.
1978-01-01
A study was performed with three objectives: (1) analyze fluid management system fill under orbital conditions; (2) determine what experimentation is needed; and (3) develop an experimental program. The fluid management system was a 1.06m (41.7 in) diameter pressure vessel with screen channel device. Analyses were conducted using liquid hydrogen and N2O4. The influence of helium and autogenous pressurization systems was considered. Analyses showed that fluid management system fill will be more difficult with a cryogen than with an earth storable. The key to a successful fill with cryogens is in devising techniques for filling without vent liquid, and removing trapped vapor from the screen device at tank fill completion. This will be accomplished with prechill, fill, and vapor condensation processes. Refill will require a vent and purge process, to dilute the residual helium, prior to introducing liquid. Neither prechill, chill, nor purge processes will be required for earth storables.
Software control and system configuration management - A process that works
NASA Technical Reports Server (NTRS)
Petersen, K. L.; Flores, C., Jr.
1983-01-01
A comprehensive software control and system configuration management process for flight-crucial digital control systems of advanced aircraft has been developed and refined to insure efficient flight system development and safe flight operations. Because of the highly complex interactions among the hardware, software, and system elements of state-of-the-art digital flight control system designs, a systems-wide approach to configuration control and management has been used. Specific procedures are implemented to govern discrepancy reporting and reconciliation, software and hardware change control, systems verification and validation testing, and formal documentation requirements. An active and knowledgeable configuration control board reviews and approves all flight system configuration modifications and revalidation tests. This flexible process has proved effective during the development and flight testing of several research aircraft and remotely piloted research vehicles with digital flight control systems that ranged from relatively simple to highly complex, integrated mechanizations.
Microvax-based data management and reduction system for the regional planetary image facilities
NASA Technical Reports Server (NTRS)
Arvidson, R.; Guinness, E.; Slavney, S.; Weiss, B.
1987-01-01
Presented is a progress report for the Regional Planetary Image Facilities (RPIF) prototype image data management and reduction system being jointly implemented by Washington University and the USGS, Flagstaff. The system will consist of a MicroVAX with a high capacity (approx 300 megabyte) disk drive, a compact disk player, an image display buffer, a videodisk player, USGS image processing software, and SYSTEM 1032 - a commercial relational database management package. The USGS, Flagstaff, will transfer their image processing software including radiometric and geometric calibration routines, to the MicroVAX environment. Washington University will have primary responsibility for developing the database management aspects of the system and for integrating the various aspects into a working system.
On the Risk Management and Auditing of SOA Based Business Processes
NASA Astrophysics Data System (ADS)
Orriens, Bart; Heuvel, Willem-Jan V./D.; Papazoglou, Mike
SOA-enabled business processes stretch across many cooperating and coordinated systems, possibly crossing organizational boundaries, and technologies like XML and Web services are used for making system-to-system interactions commonplace. Business processes form the foundation for all organizations, and as such, are impacted by industry regulations. This requires organizations to review their business processes and ensure that they meet the compliance standards set forth in legislation. In this paper we sketch a SOA-based service risk management and auditing methodology including a compliance enforcement and verification system that assures verifiable business process compliance. This is done on the basis of a knowledge-based system that allows integration of internal control systems into business processes conform pre-defined compliance rules, monitor both the normal process behavior and those of the control systems during process execution, and log these behaviors to facilitate retrospective auditing.
Managing patient complaints in China: a qualitative study in Shanghai
Jiang, Yishi; Ying, Xiaohua; Zhang, Qian; Tang, Sirui Rae; Kane, Sumit; Mukhopadhyay, Maitrayee; Qian, Xu
2014-01-01
Objectives To examine the handling system for patient complaints and to identify existing barriers that are associated with effective management of patient complaints in China. Setting Key stakeholders of the handling system for patient complaints at the national, Shanghai municipal and hospital levels in China. Participants 35 key informants including policymakers, hospital managers, healthcare providers, users and other stakeholders in Shanghai. Primary and secondary outcome measures Semistructured interviews were conducted to understand the process of handling patient complaints and factors affecting the process and outcomes of patient complaint management. Results The Chinese handling system for patient complaints was established in the past decade. Hospitals shoulder the most responsibility of patient complaint handling. Barriers to effective management of patient complaints included service users’ low awareness of the systems in the initial stage of the process; poor capacity and skills of healthcare providers, incompetence and powerlessness of complaint handlers and non-transparent exchange of information during the process of complaint handling; conflicts between relevant actors and regulations and unjustifiable complaints by patients during solution settlements; and weak enforcement of regulations, deficient information for managing patient complaints and unwillingness of the hospitals to effectively handle complaints in the postcomplaint stage. Conclusions Barriers to the effective management of patient complaints vary at the different stages of complaint handling and perspectives on these barriers differ between the service users and providers. Information, procedure design, human resources, system arrangement, unified legal system and regulations and factors shaping the social context all play important roles in effective patient complaint management. PMID:25146715
Automated Instructional Management Systems (AIMS) Version III, Users Manual.
ERIC Educational Resources Information Center
New York Inst. of Tech., Old Westbury.
This document sets forth the procedures necessary to utilize and understand the operating characteristics of the Automated Instructional Management System - Version III, a computer-based system for management of educational processes. Directions for initialization, including internal and user files; system and operational input requirements;…
Forensic Analysis of Window’s(Registered) Virtual Memory Incorporating the System’s Page-File
2008-12-01
Management and Budget, Paperwork Reduction Project (0704-0188) Washington DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE December...data in a meaningful way. One reason for this is how memory is managed by the operating system. Data belonging to one process can be distributed...way. One reason for this is how memory is managed by the operating system. Data belonging to one process can be distributed arbitrarily across
Patterns-Based IS Change Management in SMEs
NASA Astrophysics Data System (ADS)
Makna, Janis; Kirikova, Marite
The majority of information systems change management guidelines and standards are either too abstract or too bureaucratic to be easily applicable in small enterprises. This chapter proposes the approach, the method, and the prototype that are designed especially for information systems change management in small and medium enterprises. The approach is based on proven patterns of changes in the set of information systems elements. The set of elements was obtained by theoretical analysis of information systems and business process definitions and enterprise architectures. The patterns were evolved from a number of information systems theories and tested in 48 information systems change management projects. The prototype presents and helps to handle three basic change patterns, which help to anticipate the overall scope of changes related to particular elementary changes in an enterprise information system. The use of prototype requires just basic knowledge in organizational business process and information management.
Eisner, Reinhold; Patel, Rakeshkumar
2017-04-20
Quality management systems (QMS), based on ISO 9001 requirements, are applicable to government service organizations such as Health Canada's Biologics and Genetic Therapies Directorate (BGTD). This communication presents the process that the BGTD followed since the early 2000s to implement a quality management system and describes how the regulatory system was improved as a result of this project. BGTD undertook the implementation of a quality management system based on ISO 9001 and containing aspects of ISO 17025 with the goal of strengthening the regulatory system through improvements in the people, processes, and services of the organization. We discuss the strategy used by BGTD to implement the QMS and the benefits that were realized from the various stages of implementation. The eight quality principals upon which the QMS standards of the ISO 9000 series are based were used by senior management as a framework to guide QMS implementation.
NASA Astrophysics Data System (ADS)
Yin, Bo; Liu, Li; Wang, Jiahan; Li, Xiran; Liu, Zhenbo; Li, Dewei; Wang, Jun; Liu, Lu; Wu, Jun; Xu, Tingting; Cui, He
2017-10-01
Electric energy measurement as a basic work, an accurate measurements play a vital role for the economic interests of both parties of power supply, the standardized management of the measurement laboratory at all levels is a direct factor that directly affects the fairness of measurement. Currently, the management of metering laboratories generally uses one-dimensional bar code as the recognition object, advances the testing process by manual management, most of the test data requires human input to generate reports. There are many problems and potential risks in this process: Data cannot be saved completely, cannot trace the status of inspection, the inspection process isn't completely controllable and so on. For the provincial metrology center's actual requirements of the whole process management for the performance test of the power measuring appliances, using of large-capacity RF tags as a process management information media, we developed a set of general measurement experiment management system, formulated a standardized full performance test process, improved the raw data recording mode of experimental process, developed a storehouse automatic inventory device, established a strict test sample transfer and storage system, ensured that all the raw data of the inspection can be traced back, achieved full life-cycle control of the sample, significantly improved the quality control level and the effectiveness of inspection work.
Research of Manufacture Time Management System Based on PLM
NASA Astrophysics Data System (ADS)
Jing, Ni; Juan, Zhu; Liangwei, Zhong
This system is targeted by enterprises manufacturing machine shop, analyzes their business needs and builds the plant management information system of Manufacture time and Manufacture time information management. for manufacturing process Combined with WEB technology, based on EXCEL VBA development of methods, constructs a hybrid model based on PLM workshop Manufacture time management information system framework, discusses the functionality of the system architecture, database structure.
Managing computer-controlled operations
NASA Technical Reports Server (NTRS)
Plowden, J. B.
1985-01-01
A detailed discussion of Launch Processing System Ground Software Production is presented to establish the interrelationships of firing room resource utilization, configuration control, system build operations, and Shuttle data bank management. The production of a test configuration identifier is traced from requirement generation to program development. The challenge of the operational era is to implement fully automated utilities to interface with a resident system build requirements document to eliminate all manual intervention in the system build operations. Automatic update/processing of Shuttle data tapes will enhance operations during multi-flow processing.
NASA Technical Reports Server (NTRS)
Goforth, Andre
1987-01-01
The use of computers in autonomous telerobots is reaching the point where advanced distributed processing concepts and techniques are needed to support the functioning of Space Station era telerobotic systems. Three major issues that have impact on the design of data management functions in a telerobot are covered. It also presents a design concept that incorporates an intelligent systems manager (ISM) running on a spaceborne symbolic processor (SSP), to address these issues. The first issue is the support of a system-wide control architecture or control philosophy. Salient features of two candidates are presented that impose constraints on data management design. The second issue is the role of data management in terms of system integration. This referes to providing shared or coordinated data processing and storage resources to a variety of telerobotic components such as vision, mechanical sensing, real-time coordinated multiple limb and end effector control, and planning and reasoning. The third issue is hardware that supports symbolic processing in conjunction with standard data I/O and numeric processing. A SSP that currently is seen to be technologically feasible and is being developed is described and used as a baseline in the design concept.
Laadan, Oren; Nieh, Jason; Phung, Dan
2012-10-02
Methods, media and systems for managing a distributed application running in a plurality of digital processing devices are provided. In some embodiments, a method includes running one or more processes associated with the distributed application in virtualized operating system environments on a plurality of digital processing devices, suspending the one or more processes, and saving network state information relating to network connections among the one or more processes. The method further include storing process information relating to the one or more processes, recreating the network connections using the saved network state information, and restarting the one or more processes using the stored process information.
Weaknesses in Applying a Process Approach in Industry Enterprises
NASA Astrophysics Data System (ADS)
Kučerová, Marta; Mĺkva, Miroslava; Fidlerová, Helena
2012-12-01
The paper deals with a process approach as one of the main principles of the quality management. Quality management systems based on process approach currently represents one of a proofed ways how to manage an organization. The volume of sales, costs and profit levels are influenced by quality of processes and efficient process flow. As results of the research project showed, there are some weaknesses in applying of the process approach in the industrial routine and it has been often only a formal change of the functional management to process management in many organizations in Slovakia. For efficient process management it is essential that companies take attention to the way how to organize their processes and seek for their continuous improvement.
Wet weather highway accident analysis and skid resistance data management system (volume I).
DOT National Transportation Integrated Search
1992-06-01
The objectives and scope of this research are to establish an effective methodology for wet weather accident analysis and to develop a database management system to facilitate information processing and storage for the accident analysis process, skid...
RMP Guidance for Warehouses - Chapter 5: Management System
Your management system should oversee the implementation of the risk management program elements, and designate and assign responsibility in order to make process safety a constant priority. Includes sample documentation.
Tank waste remediation system systems engineering management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peck, L.G.
1998-01-08
This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves.more » The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.« less
2012-09-01
Elmendorf, D. W., & Gregory Mankiw , N. (1999). Government debt. Handbook of Macroeconomics , 1, 1615-1669. European Union. European financial stability...budget process, based on the supply chain demand management process principles of operations and it is introduced the idea of developing a Budget... principles of systems dynamics, a proposal for the development of a Budget Management Flight Simulator, that will operate as a learning and educational
Web-Based Evaluation System for Learning Management Systems
ERIC Educational Resources Information Center
Momani, Alaa
2010-01-01
E-learning systems have become an issue in recent years. A learning management system (LMS) is an electronic environment helps the educational society to communicate, exchange information, manage, and schedule the learning process. This study has provided a web-based evaluation system that may help the users to choose the convenient system…
Study on HOPE Management Mode of Coal Enterprises Based on Systematic Thinking
NASA Astrophysics Data System (ADS)
Zhaoran, Zhang; Tianzhu, Zhang; Wenjing, Tong
2018-02-01
The extensive management mode of coal enterprises is no longer applicable to the demand of enterprise development under the new economic situation. Combined with the characteristics of coal mine production, based on the system of thinking, integration of lean, people, comprehensive, job management theory, formed HOPE management model, including a core system and three support systems and 18 elements. There are three stages in the development and implementation of this model. To 6S site management for the initial stage to job process reengineering for the intermediate stage to post value process control for the advanced stage. The successful implementation of HOPE model in coal enterprises needs comprehensive control from five aspects: lean culture construction, flattening organizational structure, cost control system, performance appraisal system and lean information management platform. HOPE model can be implemented smoothly and make “win-win” between enterprises and employees.
AOIPS water resources data management system
NASA Technical Reports Server (NTRS)
Vanwie, P.
1977-01-01
The text and computer-generated displays used to demonstrate the AOIPS (Atmospheric and Oceanographic Information Processing System) water resources data management system are investigated. The system was developed to assist hydrologists in analyzing the physical processes occurring in watersheds. It was designed to alleviate some of the problems encountered while investigating the complex interrelationships of variables such as land-cover type, topography, precipitation, snow melt, surface runoff, evapotranspiration, and streamflow rates. The system has an interactive image processing capability and a color video display to display results as they are obtained.
Managing Conflict in Temporary Management Systems
ERIC Educational Resources Information Center
Wilemon, David L.
1973-01-01
As organizational tasks have grown more complex, several innovative temporary management systems such as matrix management have been developed. The Apollo space program has been an important contribution to the development of matrix management techniques. Discusses the role of conflict within the matrix, its determinants, and the process of…
Towards adaptive and integrated management paradigms to meet the challenges of water governance.
Halbe, J; Pahl-Wostl, C; Sendzimir, J; Adamowski, J
2013-01-01
Integrated Water Resource Management (IWRM) aims at finding practical and sustainable solutions to water resource issues. Research and practice have shown that innovative methods and tools are not sufficient to implement IWRM - the concept needs to also be integrated in prevailing management paradigms and institutions. Water governance science addresses this human dimension by focusing on the analysis of regulatory processes that influence the behavior of actors in water management systems. This paper proposes a new methodology for the integrated analysis of water resources management and governance systems in order to elicit and analyze case-specific management paradigms. It builds on the Management and Transition Framework (MTF) that allows for the examination of structures and processes underlying water management and governance. The new methodology presented in this paper combines participatory modeling and analysis of the governance system by using the MTF to investigate case-specific management paradigms. The linking of participatory modeling and research on complex management and governance systems allows for the transfer of knowledge between scientific, policy, engineering and local communities. In this way, the proposed methodology facilitates assessment and implementation of transformation processes towards IWRM that require also the adoption of adaptive management principles. A case study on flood management in the Tisza River Basin in Hungary is provided to illustrate the application of the proposed methodology.
González Sánchez, María José; Framiñán Torres, José Manuel; Parra Calderón, Carlos Luis; Del Río Ortega, Juan Antonio; Vigil Martín, Eduardo; Nieto Cervera, Jaime
2008-01-01
We present a methodology based on Business Process Management to guide the development of a speech recognition system in a hospital in Spain. The methodology eases the deployment of the system by 1) involving the clinical staff in the process, 2) providing the IT professionals with a description of the process and its requirements, 3) assessing advantages and disadvantages of the speech recognition system, as well as its impact in the organisation, and 4) help reorganising the healthcare process before implementing the new technology in order to identify how it can better contribute to the overall objective of the organisation.
Liu, Tongzhu; Shen, Aizong; Hu, Xiaojian; Tong, Guixian; Gu, Wei
2017-06-01
We aimed to apply collaborative business intelligence (BI) system to hospital supply, processing and distribution (SPD) logistics management model. We searched Engineering Village database, China National Knowledge Infrastructure (CNKI) and Google for articles (Published from 2011 to 2016), books, Web pages, etc., to understand SPD and BI related theories and recent research status. For the application of collaborative BI technology in the hospital SPD logistics management model, we realized this by leveraging data mining techniques to discover knowledge from complex data and collaborative techniques to improve the theories of business process. For the application of BI system, we: (i) proposed a layered structure of collaborative BI system for intelligent management in hospital logistics; (ii) built data warehouse for the collaborative BI system; (iii) improved data mining techniques such as supporting vector machines (SVM) and swarm intelligence firefly algorithm to solve key problems in hospital logistics collaborative BI system; (iv) researched the collaborative techniques oriented to data and business process optimization to improve the business processes of hospital logistics management. Proper combination of SPD model and BI system will improve the management of logistics in the hospitals. The successful implementation of the study requires: (i) to innovate and improve the traditional SPD model and make appropriate implement plans and schedules for the application of BI system according to the actual situations of hospitals; (ii) the collaborative participation of internal departments in hospital including the department of information, logistics, nursing, medical and financial; (iii) timely response of external suppliers.
Araújo, Luciano V; Malkowski, Simon; Braghetto, Kelly R; Passos-Bueno, Maria R; Zatz, Mayana; Pu, Calton; Ferreira, João E
2011-12-22
Recent medical and biological technology advances have stimulated the development of new testing systems that have been providing huge, varied amounts of molecular and clinical data. Growing data volumes pose significant challenges for information processing systems in research centers. Additionally, the routines of genomics laboratory are typically characterized by high parallelism in testing and constant procedure changes. This paper describes a formal approach to address this challenge through the implementation of a genetic testing management system applied to human genome laboratory. We introduced the Human Genome Research Center Information System (CEGH) in Brazil, a system that is able to support constant changes in human genome testing and can provide patients updated results based on the most recent and validated genetic knowledge. Our approach uses a common repository for process planning to ensure reusability, specification, instantiation, monitoring, and execution of processes, which are defined using a relational database and rigorous control flow specifications based on process algebra (ACP). The main difference between our approach and related works is that we were able to join two important aspects: 1) process scalability achieved through relational database implementation, and 2) correctness of processes using process algebra. Furthermore, the software allows end users to define genetic testing without requiring any knowledge about business process notation or process algebra. This paper presents the CEGH information system that is a Laboratory Information Management System (LIMS) based on a formal framework to support genetic testing management for Mendelian disorder studies. We have proved the feasibility and showed usability benefits of a rigorous approach that is able to specify, validate, and perform genetic testing using easy end user interfaces.
2011-01-01
Background Recent medical and biological technology advances have stimulated the development of new testing systems that have been providing huge, varied amounts of molecular and clinical data. Growing data volumes pose significant challenges for information processing systems in research centers. Additionally, the routines of genomics laboratory are typically characterized by high parallelism in testing and constant procedure changes. Results This paper describes a formal approach to address this challenge through the implementation of a genetic testing management system applied to human genome laboratory. We introduced the Human Genome Research Center Information System (CEGH) in Brazil, a system that is able to support constant changes in human genome testing and can provide patients updated results based on the most recent and validated genetic knowledge. Our approach uses a common repository for process planning to ensure reusability, specification, instantiation, monitoring, and execution of processes, which are defined using a relational database and rigorous control flow specifications based on process algebra (ACP). The main difference between our approach and related works is that we were able to join two important aspects: 1) process scalability achieved through relational database implementation, and 2) correctness of processes using process algebra. Furthermore, the software allows end users to define genetic testing without requiring any knowledge about business process notation or process algebra. Conclusions This paper presents the CEGH information system that is a Laboratory Information Management System (LIMS) based on a formal framework to support genetic testing management for Mendelian disorder studies. We have proved the feasibility and showed usability benefits of a rigorous approach that is able to specify, validate, and perform genetic testing using easy end user interfaces. PMID:22369688
Use of electronic information systems in nursing management.
Lammintakanen, Johanna; Saranto, Kaija; Kivinen, Tuula
2010-05-01
The purpose of this study is to describe nurse managers' perceptions of the use of electronic information systems in their daily work. Several kinds of software are used for administrative and information management purposes in health care organizations, but the issue has been studied less from nurse managers' perspective. The material for this qualitative study was acquired according to the principles of focus group interview. Altogether eight focus groups were held with 48 nurse managers from both primary and specialized health care organizations. The nurse managers were asked in focus groups to describe the use of information systems in their daily work in addition to some other themes. The material was analyzed by inductive content analysis using ATLAS.ti computer program. The main category "pros and cons of using information systems in nursing management" summarized the nurse managers' perceptions of using electronic information systems. The main category consisted of three sub-categories: (1) nurse managers' perceptions of the use of information technology; (2) usability of management information systems; (3) development of personnel competencies and work processes. The nurse managers made several comments on the implementation of immature electronic information systems which caused inefficiencies in working processes. However, they considered electronic information systems to be essential elements of their daily work. Furthermore, the nurse managers' descriptions of the pros and cons of using information systems reflected partly the shortcomings of strategic management and lack of coordination in health care organizations. Copyright 2010 Elsevier Ireland Ltd. All rights reserved.
Natural Resource Information System. Volume 1: Overall description
NASA Technical Reports Server (NTRS)
1972-01-01
A prototype computer-based Natural Resource Information System was designed which could store, process, and display data of maximum usefulness to land management decision making. The system includes graphic input and display, the use of remote sensing as a data source, and it is useful at multiple management levels. A survey established current decision making processes and functions, information requirements, and data collection and processing procedures. The applications of remote sensing data and processing requirements were established. Processing software was constructed and a data base established using high-altitude imagery and map coverage of selected areas of SE Arizona. Finally a demonstration of system processing functions was conducted utilizing material from the data base.
NASA Technical Reports Server (NTRS)
Kelle, Pido I.; Ratterman, Christian; Gibbs, Cecil
2009-01-01
This slide presentation reviews the Constellation Program Problem Reporting, Analysis and Corrective Action Process and System (Cx PRACA). The goal of the Cx PRACA is to incorporate Lessons learned from the Shuttle, ISS, and Orbiter programs by creating a single tool for managing the PRACA process, that clearly defines the scope of PRACA applicability and what must be reported, and defines the ownership and responsibility for managing the PRACA process including disposition approval authority. CxP PRACA is a process, supported by a single information gathering data module which will be integrated with a single CxP Information System, providing interoperability, import and export capability making the CxP PRACA a more effective and user friendly technical and management tool.
Incorporating a social-ecological-technological systems (SETS) perspective to the adaptive management process requires that stakeholders and managers conceptualize restoration projects as part of coupled human and natural systems and assess underlying social drivers and accrued b...
Medical Information Management System
NASA Technical Reports Server (NTRS)
Alterescu, S.; Hipkins, K. R.; Friedman, C. A.
1979-01-01
On-line interactive information processing system easily and rapidly handles all aspects of data management related to patient care. General purpose system is flexible enough to be applied to other data management situations found in areas such as occupational safety data, judicial information, or personnel records.
NASA Occupational Health Program FY98 Self-Assessment
NASA Technical Reports Server (NTRS)
Brisbin, Steven G.
1999-01-01
The NASA Functional Management Review process requires that each NASA Center conduct self-assessments of each functional area. Self-Assessments were completed in June 1998 and results were presented during this conference session. During FY 97 NASA Occupational Health Assessment Team activities, a decision was made to refine the NASA Self-Assessment Process. NASA Centers were involved in the ISO registration process at that time and wanted to use the management systems approach to evaluate their occupational health programs. This approach appeared to be more consistent with NASA's management philosophy and would likely confer status needed by Senior Agency Management for the program. During FY 98 the Agency Occupational Health Program Office developed a revised self-assessment methodology based on the Occupational Health and Safety Management System developed by the American Industrial Hygiene Association. This process was distributed to NASA Centers in March 1998 and completed in June 1998. The Center Self Assessment data will provide an essential baseline on the status of OHP management processes at NASA Centers. That baseline will be presented to Enterprise Associate Administrators and DASHO on September 22, 1998 and used as a basis for discussion during FY 99 visits to NASA Centers. The process surfaced several key management system elements warranting further support from the Lead Center. Input and feedback from NASA Centers will be essential to defining and refining future self assessment efforts.
An Approach for Implementation of Project Management Information Systems
NASA Astrophysics Data System (ADS)
Běrziša, Solvita; Grabis, Jānis
Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.
Requirement analysis for the one-stop logistics management of fresh agricultural products
NASA Astrophysics Data System (ADS)
Li, Jun; Gao, Hongmei; Liu, Yuchuan
2017-08-01
Issues and concerns for food safety, agro-processing, and the environmental and ecological impact of food production have been attracted many research interests. Traceability and logistics management of fresh agricultural products is faced with the technological challenges including food product label and identification, activity/process characterization, information systems for the supply chain, i.e., from farm to table. Application of one-stop logistics service focuses on the whole supply chain process integration for fresh agricultural products is studied. A collaborative research project for the supply and logistics of fresh agricultural products in Tianjin was performed. Requirement analysis for the one-stop logistics management information system is studied. The model-driven business transformation, an approach uses formal models to explicitly define the structure and behavior of a business, is applied for the review and analysis process. Specific requirements for the logistic management solutions are proposed. Development of this research is crucial for the solution of one-stop logistics management information system integration platform for fresh agricultural products.
Neubert, Sebastian; Göde, Bernd; Gu, Xiangyu; Stoll, Norbert; Thurow, Kerstin
2017-04-01
Modern business process management (BPM) is increasingly interesting for laboratory automation. End-to-end workflow automation and improved top-level systems integration for information technology (IT) and automation systems are especially prominent objectives. With the ISO Standard Business Process Model and Notation (BPMN) 2.X, a system-independent and interdisciplinary accepted graphical process control notation is provided, allowing process analysis, while also being executable. The transfer of BPM solutions to structured laboratory automation places novel demands, for example, concerning the real-time-critical process and systems integration. The article discusses the potential of laboratory execution systems (LESs) for an easier implementation of the business process management system (BPMS) in hierarchical laboratory automation. In particular, complex application scenarios, including long process chains based on, for example, several distributed automation islands and mobile laboratory robots for a material transport, are difficult to handle in BPMSs. The presented approach deals with the displacement of workflow control tasks into life science specialized LESs, the reduction of numerous different interfaces between BPMSs and subsystems, and the simplification of complex process modelings. Thus, the integration effort for complex laboratory workflows can be significantly reduced for strictly structured automation solutions. An example application, consisting of a mixture of manual and automated subprocesses, is demonstrated by the presented BPMS-LES approach.
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2013 CFR
2013-10-01
... Processing and Information Retrieval System Guide. The initial advance automatic data processing planning... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2012 CFR
2012-10-01
... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2011 CFR
2011-10-01
... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
DOT National Transportation Integrated Search
1992-06-01
The objectives and scope of this research are to establish an effective methodology for wet weather accident analysis and to develop a database management system to facilitate information processing and storage for the accident analysis process, skid...
23 CFR 972.204 - Management systems requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... to operate and maintain the management systems and their associated databases; and (5) A process for... systems will use databases with a geographical reference system that can be used to geolocate all database...
23 CFR 972.204 - Management systems requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... to operate and maintain the management systems and their associated databases; and (5) A process for... systems will use databases with a geographical reference system that can be used to geolocate all database...
23 CFR 972.204 - Management systems requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... to operate and maintain the management systems and their associated databases; and (5) A process for... systems will use databases with a geographical reference system that can be used to geolocate all database...
23 CFR 972.204 - Management systems requirements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... to operate and maintain the management systems and their associated databases; and (5) A process for... systems will use databases with a geographical reference system that can be used to geolocate all database...
A cost-benefit analysis for materials management information systems.
Slapak-Iacobelli, L; Wilde, A H
1993-02-01
The cost-benefit analysis provided the system planners with valuable information that served many purposes. It answered the following questions: Why was the CCF undertaking this project? What were the alternatives? How much was it going to cost? And what was the expected outcome? The process of developing cost-benefit the document kept the project team focused. It also motivated them to involve additional individuals from materials management and accounts payable in its development. A byproduct of this involvement was buy-in and commitment to the project by everyone in these areas. Consequently, the project became a team effort championed by many and not just one. We were also able to introduce two new information system processes: 1) a management review process with goals and anticipated results, and 2) a quality assurance process that ensured the CCF had a better product in the end. The cost-benefit analysis provided a planning tool that assisted in successful implementation of an integrated materials management information system.
Munir, Samina K; Kay, Stephen
2005-08-01
A multi-site study, conducted in two English and two Danish intensive care units, investigates the complexity of work processes in intensive care, and the implications of this complexity for information management with regards to clinical information systems. Data were collected via observations, shadowing of clinical staff, interviews and questionnaires. The construction of role activity diagrams enabled the capture of critical care work processes. Upon analysing these diagrams, it was found that intensive care work processes consist of 'simplified-complexity', these processes are changed with the introduction of information systems for the everyday use and management of all clinical information. The prevailing notion of complexity surrounding critical care clinical work processes was refuted and found to be misleading; in reality, it is not the work processes that cause the complexity, the complexity is rooted in the way in which clinical information is used and managed. This study emphasises that the potential for clinical information systems that consider integrating all clinical information requirements is not only immense but also very plausible.
NASA Technical Reports Server (NTRS)
1974-01-01
The Earth Observatory Satellite (EOS) data management system (DMS) is discussed. The DMS is composed of several subsystems or system elements which have basic purposes and are connected together so that the DMS can support the EOS program by providing the following: (1) payload data acquisition and recording, (2) data processing and product generation, (3) spacecraft and processing management and control, and (4) data user services. The configuration and purposes of the primary or high-data rate system and the secondary or local user system are explained. Diagrams of the systems are provided to support the systems analysis.
The Influence of Leadership in Implementing Management Systems
NASA Astrophysics Data System (ADS)
Nae, Ilie; Solomon, Gheorghe; Severin, Irina
2014-12-01
This paper presents a new perspective of the implementation of Management Systems within organizations in order to increase the success rate. The objective is to analyse how the leadership could influence positively or negatively the implementation, according to the leadership approach chosen. It offers a method to analyse the maturity of the leadership for any organization, based on existing leadership models, completing these models with specificities of a Management System. The Maturity Grid is extended to key elements of the Organizational Leadership: Strategic Planning, Process and Performance. The results expected are to change the current understanding of leadership during a Management System implementation(leadership seen as a principle) to an active leadership, implemented at organizational level. It propose an alternative of the classic management approach, to a Performance Management approach, that integrates naturally the leadership in all processes and methods
Risk management and measuring productivity with POAS--point of act system.
Akiyama, Masanori; Kondo, Tatsuya
2007-01-01
The concept of our system is not only to manage material flows, but also to provide an integrated management resource, a means of correcting errors in medical treatment, and applications to EBM through the data mining of medical records. Prior to the development of this system, electronic processing systems in hospitals did a poor job of accurately grasping medical practice and medical material flows. With POAS (Point of Act System), hospital managers can solve the so-called, "man, money, material, and information" issues inherent in the costs of healthcare. The POAS system synchronizes with each department system, from finance and accounting, to pharmacy, to imaging, and allows information exchange. We can manage Man, Material, Money and Information completely by this system. Our analysis has shown that this system has a remarkable investment effect - saving over four million dollars per year - through cost savings in logistics and business process efficiencies. In addition, the quality of care has been improved dramatically while error rates have been reduced - nearly to zero in some cases.
Advanced information processing system: Input/output network management software
NASA Technical Reports Server (NTRS)
Nagle, Gail; Alger, Linda; Kemp, Alexander
1988-01-01
The purpose of this document is to provide the software requirements and specifications for the Input/Output Network Management Services for the Advanced Information Processing System. This introduction and overview section is provided to briefly outline the overall architecture and software requirements of the AIPS system before discussing the details of the design requirements and specifications of the AIPS I/O Network Management software. A brief overview of the AIPS architecture followed by a more detailed description of the network architecture.
Managing laboratory automation
Saboe, Thomas J.
1995-01-01
This paper discusses the process of managing automated systems through their life cycles within the quality-control (QC) laboratory environment. The focus is on the process of directing and managing the evolving automation of a laboratory; system examples are given. The author shows how both task and data systems have evolved, and how they interrelate. A BIG picture, or continuum view, is presented and some of the reasons for success or failure of the various examples cited are explored. Finally, some comments on future automation need are discussed. PMID:18925018
Optimizing claims payment for successful risk management.
Frates, Janice; Ginty, Mary Jo; Baker, Linda
2002-05-01
Disputed claims and delayed payments are among the principal sources of provider and vendor dissatisfaction with managed care payment systems. Timely and accurate claims-payment systems are essential to ensure provider and vendor satisfaction, fiscal stability, and regulatory compliance. A focused analysis of conditions contributing to late payment of claims can disclose problems in provider, vendor, or payer operational and billing procedures, contracting processes, information systems, or human resources management. Resolution of these conditions equips claims-processing staff with tools to resolve problem claims promptly, thereby lowering costs.
Managing laboratory automation.
Saboe, T J
1995-01-01
This paper discusses the process of managing automated systems through their life cycles within the quality-control (QC) laboratory environment. The focus is on the process of directing and managing the evolving automation of a laboratory; system examples are given. The author shows how both task and data systems have evolved, and how they interrelate. A BIG picture, or continuum view, is presented and some of the reasons for success or failure of the various examples cited are explored. Finally, some comments on future automation need are discussed.
Flexible Early Warning Systems with Workflows and Decision Tables
NASA Astrophysics Data System (ADS)
Riedel, F.; Chaves, F.; Zeiner, H.
2012-04-01
An essential part of early warning systems and systems for crisis management are decision support systems that facilitate communication and collaboration. Often official policies specify how different organizations collaborate and what information is communicated to whom. For early warning systems it is crucial that information is exchanged dynamically in a timely manner and all participants get exactly the information they need to fulfil their role in the crisis management process. Information technology obviously lends itself to automate parts of the process. We have experienced however that in current operational systems the information logistics processes are hard-coded, even though they are subject to change. In addition, systems are tailored to the policies and requirements of a certain organization and changes can require major software refactoring. We seek to develop a system that can be deployed and adapted to multiple organizations with different dynamic runtime policies. A major requirement for such a system is that changes can be applied locally without affecting larger parts of the system. In addition to the flexibility regarding changes in policies and processes, the system needs to be able to evolve; when new information sources become available, it should be possible to integrate and use these in the decision process. In general, this kind of flexibility comes with a significant increase in complexity. This implies that only IT professionals can maintain a system that can be reconfigured and adapted; end-users are unable to utilise the provided flexibility. In the business world similar problems arise and previous work suggested using business process management systems (BPMS) or workflow management systems (WfMS) to guide and automate early warning processes or crisis management plans. However, the usability and flexibility of current WfMS are limited, because current notations and user interfaces are still not suitable for end-users, and workflows are usually only suited for rigid processes. We show how improvements can be achieved by using decision tables and rule-based adaptive workflows. Decision tables have been shown to be an intuitive tool that can be used by domain experts to express rule sets that can be interpreted automatically at runtime. Adaptive workflows use a rule-based approach to increase the flexibility of workflows by providing mechanisms to adapt workflows based on context changes, human intervention and availability of services. The combination of workflows, decision tables and rule-based adaption creates a framework that opens up new possibilities for flexible and adaptable workflows, especially, for use in early warning and crisis management systems.
Los Alamos Plutonium Facility Waste Management System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, K.; Montoya, A.; Wieneke, R.
1997-02-01
This paper describes the new computer-based transuranic (TRU) Waste Management System (WMS) being implemented at the Plutonium Facility at Los Alamos National Laboratory (LANL). The Waste Management System is a distributed computer processing system stored in a Sybase database and accessed by a graphical user interface (GUI) written in Omnis7. It resides on the local area network at the Plutonium Facility and is accessible by authorized TRU waste originators, count room personnel, radiation protection technicians (RPTs), quality assurance personnel, and waste management personnel for data input and verification. Future goals include bringing outside groups like the LANL Waste Management Facilitymore » on-line to participate in this streamlined system. The WMS is changing the TRU paper trail into a computer trail, saving time and eliminating errors and inconsistencies in the process.« less
Integrated management of thesis using clustering method
NASA Astrophysics Data System (ADS)
Astuti, Indah Fitri; Cahyadi, Dedy
2017-02-01
Thesis is one of major requirements for student in pursuing their bachelor degree. In fact, finishing the thesis involves a long process including consultation, writing manuscript, conducting the chosen method, seminar scheduling, searching for references, and appraisal process by the board of mentors and examiners. Unfortunately, most of students find it hard to match all the lecturers' free time to sit together in a seminar room in order to examine the thesis. Therefore, seminar scheduling process should be on the top of priority to be solved. Manual mechanism for this task no longer fulfills the need. People in campus including students, staffs, and lecturers demand a system in which all the stakeholders can interact each other and manage the thesis process without conflicting their timetable. A branch of computer science named Management Information System (MIS) could be a breakthrough in dealing with thesis management. This research conduct a method called clustering to distinguish certain categories using mathematics formulas. A system then be developed along with the method to create a well-managed tool in providing some main facilities such as seminar scheduling, consultation and review process, thesis approval, assessment process, and also a reliable database of thesis. The database plays an important role in present and future purposes.
NASA Astrophysics Data System (ADS)
Marie, I. A.; Sugiarto, D.; Surjasa, D.; Witonohadi, A.
2018-01-01
Automotive battery supply chain include battery manufacturer, sulphuric acid suppliers, polypropylene suppliers, lead suppliers, transportation service providers, warehouses, retailers and even customers. Due to the increasingly dynamic condition of the environment, supply chain actors were required to improve their ability to overcome various uncertainty issues in the environment. This paper aims to describe the process of designing a knowledge management system for risk mitigation in supply chain uncertainty. The design methodology began with the identification of the knowledge needed to solve the problems associated with uncertainty and analysis of system requirements. The design of the knowledge management system was described in the form of a data flow diagram. The results of the study indicated that key knowledge area that needs to be managed were the knowledge to maintain the stability of process in sulphuric acid process and knowledge to overcome the wastes in battery manufacturing process. The system was expected to be a media acquisition, dissemination and storage of knowledge associated with the uncertainty in the battery supply chain and increase the supply chain performance.
A Recipe for Streamlining Mission Management
NASA Technical Reports Server (NTRS)
Mitchell, Andrew E.; Semancik, Susan K.
2004-01-01
This paper describes a project's design and implementation for streamlining mission management with knowledge capture processes across multiple organizations of a NASA directorate. Thc project's focus is on standardizing processes and reports; enabling secure information access and case of maintenance; automating and tracking appropriate workflow rules through process mapping; and infusing new technologies. This paper will describe a small team's experiences using XML technologies through an enhanced vendor suite of applications integrated on Windows-based platforms called the Wallops Integrated Scheduling and Document Management System (WISDMS). This paper describes our results using this system in a variety of endeavors, including providing range project scheduling and resource management for a Range and Mission Management Office; implementing an automated Customer Feedback system for a directorate; streamlining mission status reporting across a directorate; and initiating a document management, configuration management and portal access system for a Range Safety Office's programs. The end result is a reduction of the knowledge gap through better integration and distribution of information, improved process performance, automated metric gathering, and quicker identification of problem areas and issues. However, the real proof of the pudding comes through overcoming the user's reluctance to replace familiar, seasoned processes with new technology ingredients blended with automated procedures in an untested recipe. This paper shares some of the team's observations that led to better implementation techniques, as well as an IS0 9001 Best Practices citation. This project has provided a unique opportunity to advance NASA's competency in new technologies, as well as to strategically implement them within an organizational structure, while wetting the appetite for continued improvements in mission management.
The Air Program Information Management System (APIMS)
2011-11-02
Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information Management System : Sustainability of Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement
Blair, C S; Fordyce, M; Barney, S M
1993-10-01
For a quality management transformation to occur, a healthcare organization must focus on education and development, performance management, and recognition and reward systems during the first years of implementation. Education and development are perhaps the most important human resource management functions when implementing quality management principles and processes because behavioral changes will be required at all organizational levels. Specific programs that support an organization's quality management effort will vary but should include the conceptual, cultural, and technical aspects of quality management. The essence of quality management is to always satisfy the customer and to continuously improve the services and products the organization offers. The approach to performance management should therefore rely on customer feedback and satisfaction. An organization committed to quality management should base its performance management approach on customer orientation, process improvement, employee involvement, decision making with data, and continuous improvement. Managers and trustees are being challenged to provide innovative recognition and reward systems that reinforce the values and behaviors consistent with quality management. Such systems must also be aligned with the behaviors and outcomes that support the philosophy, mission, and values of the Catholic healthcare ministry. The following components should be considered for a recognition and reward system: base pay, incentives, benefits, and nonmonetary rewards.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, Edward J., Jr.; Henry, Karen Lynne
Sandia National Laboratories develops technologies to: (1) sustain, modernize, and protect our nuclear arsenal (2) Prevent the spread of weapons of mass destruction; (3) Provide new capabilities to our armed forces; (4) Protect our national infrastructure; (5) Ensure the stability of our nation's energy and water supplies; and (6) Defend our nation against terrorist threats. We identified the need for a single overarching Integrated Workplace Management System (IWMS) that would enable us to focus on customer missions and improve FMOC processes. Our team selected highly configurable commercial-off-the-shelf (COTS) software with out-of-the-box workflow processes that integrate strategic planning, project management, facilitymore » assessments, and space management, and can interface with existing systems, such as Oracle, PeopleSoft, Maximo, Bentley, and FileNet. We selected the Integrated Workplace Management System (IWMS) from Tririga, Inc. Facility Management System (FMS) Benefits are: (1) Create a single reliable source for facility data; (2) Improve transparency with oversight organizations; (3) Streamline FMOC business processes with a single, integrated facility-management tool; (4) Give customers simple tools and real-time information; (5) Reduce indirect costs; (6) Replace approximately 30 FMOC systems and 60 homegrown tools (such as Microsoft Access databases); and (7) Integrate with FIMS.« less
2006-06-23
KENNEDY SPACE CENTER, FLA. - An overview of the new Firing Room 4 shows the expanse of computer stations and the various operations the facility will be able to manage. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis
Park, Yu Rang; Yoon, Young Jo; Koo, HaYeong; Yoo, Soyoung; Choi, Chang-Min; Beck, Sung-Ho
2018-01-01
Background Clinical trials pose potential risks in both communications and management due to the various stakeholders involved when performing clinical trials. The academic medical center has a responsibility and obligation to conduct and manage clinical trials while maintaining a sufficiently high level of quality, therefore it is necessary to build an information technology system to support standardized clinical trial processes and comply with relevant regulations. Objective The objective of the study was to address the challenges identified while performing clinical trials at an academic medical center, Asan Medical Center (AMC) in Korea, by developing and utilizing a clinical trial management system (CTMS) that complies with standardized processes from multiple departments or units, controlled vocabularies, security, and privacy regulations. Methods This study describes the methods, considerations, and recommendations for the development and utilization of the CTMS as a consolidated research database in an academic medical center. A task force was formed to define and standardize the clinical trial performance process at the site level. On the basis of the agreed standardized process, the CTMS was designed and developed as an all-in-one system complying with privacy and security regulations. Results In this study, the processes and standard mapped vocabularies of a clinical trial were established at the academic medical center. On the basis of these processes and vocabularies, a CTMS was built which interfaces with the existing trial systems such as the electronic institutional review board health information system, enterprise resource planning, and the barcode system. To protect patient data, the CTMS implements data governance and access rules, and excludes 21 personal health identifiers according to the Health Insurance Portability and Accountability Act (HIPAA) privacy rule and Korean privacy laws. Since December 2014, the CTMS has been successfully implemented and used by 881 internal and external users for managing 11,645 studies and 146,943 subjects. Conclusions The CTMS was introduced in the Asan Medical Center to manage the large amounts of data involved with clinical trial operations. Inter- and intraunit control of data and resources can be easily conducted through the CTMS system. To our knowledge, this is the first CTMS developed in-house at an academic medical center side which can enhance the efficiency of clinical trial management in compliance with privacy and security laws. PMID:29691212
5 CFR 9901.223 - Appeal to DoD for review of classification decisions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM (NSPS) Classification Classification Process § 9901... process. (1) Employee appeals to DoD must be submitted through the employee's servicing Human Resources...
Development and application of an acceptance testing model
NASA Technical Reports Server (NTRS)
Pendley, Rex D.; Noonan, Caroline H.; Hall, Kenneth R.
1992-01-01
The process of acceptance testing large software systems for NASA has been analyzed, and an empirical planning model of the process constructed. This model gives managers accurate predictions of the staffing needed, the productivity of a test team, and the rate at which the system will pass. Applying the model to a new system shows a high level of agreement between the model and actual performance. The model also gives managers an objective measure of process improvement.
1987-01-16
menus , controls user and device access to the system, manages the security features associated with menus , devices, and users, provides...in the files, or the number of files in the system. 2-2 3.0 MODULE INPUT PROCESSES 3.1 Summary of Input Processes The EE module contains many menu ...Output Processes The EE module contains many menu options which enable the user to obtain needed information from the module. These options can be
NASA Astrophysics Data System (ADS)
Liu, Yuling; Wang, Xiaoping; Zhu, Yuhui; Fei, Lanlan
2017-08-01
This paper introduces a Comprehensively Functional Integrated Management Information System designed for the Optical Engineering Major by the College of Optical Science and Engineering, Zhejiang University, which combines the functions of teaching, students learning, educational assessment and management. The system consists of 5 modules, major overview, online curriculum, experiment teaching management, graduation project management and teaching quality feedback. The major overview module introduces the development history, training program, curriculums and experiment syllabus and teaching achievements of optical engineering major in Zhejiang University. The Management Information System is convenient for students to learn in a mobile and personalized way. The online curriculum module makes it very easy for teachers to setup a website for new curriculums. On the website, teachers can help students on their problems about the curriculums in time and collect their homework online. The experiment teaching management module and the graduation project management module enables the students to fulfill their experiment process and graduation thesis under the help of their supervisors. Before students take an experiment in the lab, they must pass the pre-experiment quiz on the corresponding module. After the experiment, students need to submit the experiment report to the web server. Moreover, the module contains experiment process video recordings, which are very helpful to improve the effect of the experiment education. The management of the entire process of a student's graduation program, including the project selection, mid-term inspection, progress report of every two weeks, final thesis, et al, is completed by the graduation project management module. The teaching quality feedback module is not only helpful for teachers to know whether the education effect of curriculum is good or not, but also helpful for the administrators of the college to know whether the design of syllabus is reasonable or not. The Management Information System changes the management object from the education results to the entire education processes. And it improves the efficiency of the management. It provides an effective method to promote curriculum construction management by supervision and evaluation, which improves students' learning outcomes and the quality of curriculums. As a result, it promotes the quality system of education obviously.
5 CFR 9701.221 - Classification requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Section 9701.221 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.221 Classification...
5 CFR 9701.221 - Classification requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Section 9701.221 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.221 Classification...
5 CFR 9701.221 - Classification requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Section 9701.221 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.221 Classification...
5 CFR 9701.221 - Classification requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Section 9701.221 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.221 Classification...
Defining and reconstructing clinical processes based on IHE and BPMN 2.0.
Strasser, Melanie; Pfeifer, Franz; Helm, Emmanuel; Schuler, Andreas; Altmann, Josef
2011-01-01
This paper describes the current status and the results of our process management system for defining and reconstructing clinical care processes, which contributes to compare, analyze and evaluate clinical processes and further to identify high cost tasks or stays. The system is founded on IHE, which guarantees standardized interfaces and interoperability between clinical information systems. At the heart of the system there is BPMN, a modeling notation and specification language, which allows the definition and execution of clinical processes. The system provides functionality to define healthcare information system independent clinical core processes and to execute the processes in a workflow engine. Furthermore, the reconstruction of clinical processes is done by evaluating an IHE audit log database, which records patient movements within a health care facility. The main goal of the system is to assist hospital operators and clinical process managers to detect discrepancies between defined and actual clinical processes and as well to identify main causes of high medical costs. Beyond that, the system can potentially contribute to reconstruct and improve clinical processes and enhance cost control and patient care quality.
Efficient Evaluation System for Learning Management Systems
ERIC Educational Resources Information Center
Cavus, Nadire
2009-01-01
A learning management system (LMS) provides the platform for web-based learning environment by enabling the management, delivery, tracking of learning, testing, communication, registration process and scheduling. There are many LMS systems on the market that can be obtained for free or through payment. It has now become an important task to choose…
Business Process Reengineering towards an Integrated Learning Management System
ERIC Educational Resources Information Center
Basal, Abdelraheem Mousa
2010-01-01
The task of managing an information technology (IT) system in a school environment poses unique challenges. For example, one of the greatest challenges facing individual schools is the lack of integration among various information systems. The present situation in many schools is that there are many disconnected systems managing many different…
41 CFR 101-26.506-4 - Acceptance and processing of requests.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Acceptance and processing of requests. 101-26.506-4 Section 101-26.506-4 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26...
41 CFR 102-173.75 - How long does the process take?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...
41 CFR 102-173.75 - How long does the process take?
Code of Federal Regulations, 2012 CFR
2012-01-01
... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...
41 CFR 102-173.75 - How long does the process take?
Code of Federal Regulations, 2014 CFR
2014-01-01
... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...
41 CFR 102-173.75 - How long does the process take?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...
41 CFR 102-173.75 - How long does the process take?
Code of Federal Regulations, 2011 CFR
2011-01-01
... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...
Transitioning to Integrated Modular Avionics with a Mission Management System
2000-10-01
software structure, which is based on the use of a of interchangeable processing modules of a limited COTS Real - Time Operating System . number of...open standardised interfaces system hardware or the Real - Time Operating System directly supports the use of COTS components, which implementation, to...System RTOS Real - Time Operating System SMBP System Management Blueprint Interface SMOS System Management to Operating System Interface Figure 2: The ASAAC
41 CFR 101-6.2109 - How does the Administrator receive and respond to comments?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 6... transmits a State process recommendation for a program selected under § 101-6.2106. (b)(1) The single point... and entities where there is no State process recommendation. (2) If a State process recommendation is...
NASA Astrophysics Data System (ADS)
Cheng, Po-Hsun; Chen, Sao-Jie; Lai, Jin-Shin; Lai, Feipei
This paper illustrates a feasible health informatics domain knowledge management process which helps gather useful technology information and reduce many knowledge misunderstandings among engineers who have participated in the IBM mainframe rightsizing project at National Taiwan University (NTU) Hospital. We design an asynchronously sharing mechanism to facilitate the knowledge transfer and our health informatics domain knowledge management process can be used to publish and retrieve documents dynamically. It effectively creates an acceptable discussion environment and even lessens the traditional meeting burden among development engineers. An overall description on the current software development status is presented. Then, the knowledge management implementation of health information systems is proposed.
System Enhancements for Mechanical Inspection Processes
NASA Technical Reports Server (NTRS)
Hawkins, Myers IV
2011-01-01
Quality inspection of parts is a major component to any project that requires hardware implementation. Keeping track of all of the inspection jobs is essential to having a smooth running process. By using HTML, the programming language ColdFusion, and the MySQL database, I created a web-based job management system for the 170 Mechanical Inspection Group that will replace the Microsoft Access based management system. This will improve the ways inspectors and the people awaiting inspection view and keep track of hardware as it is in the inspection process. In the end, the management system should be able to insert jobs into a queue, place jobs in and out of a bonded state, pre-release bonded jobs, and close out inspection jobs.
An Integration of a GIS with Peatland Management
NASA Technical Reports Server (NTRS)
Hoshal, J. C.; Johnson, R. L.
1982-01-01
The complexities of peatland management in Minnesota and the use of a geographic information system, the Minnesota Land Management Information System (MLMIS) in the management process are examined. General information on the nature of peat and it quantity and distribution in Minnesota is also presented.
Intelligent Work Process Engineering System
NASA Technical Reports Server (NTRS)
Williams, Kent E.
2003-01-01
Optimizing performance on work activities and processes requires metrics of performance for management to monitor and analyze in order to support further improvements in efficiency, effectiveness, safety, reliability and cost. Information systems are therefore required to assist management in making timely, informed decisions regarding these work processes and activities. Currently information systems regarding Space Shuttle maintenance and servicing do not exist to make such timely decisions. The work to be presented details a system which incorporates various automated and intelligent processes and analysis tools to capture organize and analyze work process related data, to make the necessary decisions to meet KSC organizational goals. The advantages and disadvantages of design alternatives to the development of such a system will be discussed including technologies, which would need to bedesigned, prototyped and evaluated.
A management, leadership, and board road map to transforming care for patients.
Toussaint, John
2013-01-01
Over the last decade I have studied 115 healthcare organizations in II countries, examining them from the boardroom to the patient bedside. In that time, I have observed one critical element missing from just about every facility: a set of standards that could reliably produce zero-defect care for patients. This lack of standards is largely rooted in the Sloan management approach, a top-down management and leadership structure that is void of standardized accountability. This article offers an alternative approach: management by process--an operating system that engages frontline staff in decisions and imposes standards and processes on the act of managing. Organizations that have adopted management by process have seen quality improve and costs decrease because the people closest to the work are expected to identify problems and solve them. Also detailed are the leadership behaviors required for an organization to successfully implement the management-by-process operating system and the board of trustees' role in supporting the transformation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...
A Strategy for Improved System Assurance
2007-06-20
Quality (Measurements Life Cycle Safety, Security & Others) ISO /IEC 12207 * Software Life Cycle Processes ISO 9001 Quality Management System...14598 Software Product Evaluation Related ISO /IEC 90003 Guidelines for the Application of ISO 9001:2000 to Computer Software IEEE 12207 Industry...Implementation of International Standard ISO /IEC 12207 IEEE 1220 Standard for Application and Management of the System Engineering Process Use in
Spitzer Telemetry Processing System
NASA Technical Reports Server (NTRS)
Stanboli, Alice; Martinez, Elmain M.; McAuley, James M.
2013-01-01
The Spitzer Telemetry Processing System (SirtfTlmProc) was designed to address objectives of JPL's Multi-mission Image Processing Lab (MIPL) in processing spacecraft telemetry and distributing the resulting data to the science community. To minimize costs and maximize operability, the software design focused on automated error recovery, performance, and information management. The system processes telemetry from the Spitzer spacecraft and delivers Level 0 products to the Spitzer Science Center. SirtfTlmProc is a unique system with automated error notification and recovery, with a real-time continuous service that can go quiescent after periods of inactivity. The software can process 2 GB of telemetry and deliver Level 0 science products to the end user in four hours. It provides analysis tools so the operator can manage the system and troubleshoot problems. It automates telemetry processing in order to reduce staffing costs.
Major system acquisitions process (A-109)
NASA Technical Reports Server (NTRS)
Saric, C.
1991-01-01
The Major System examined is a combination of elements (hardware, software, facilities, and services) that function together to produce capabilities required to fulfill a mission need. The system acquisition process is a sequence of activities beginning with documentation of mission need and ending with introduction of major system into operational use or otherwise successful achievement of program objectives. It is concluded that the A-109 process makes sense and provides a systematic, integrated management approach along with appropriate management level involvement and innovative and 'best ideas' from private sector in satisfying mission needs.
TMT approach to observatory software development process
NASA Astrophysics Data System (ADS)
Buur, Hanne; Subramaniam, Annapurni; Gillies, Kim; Dumas, Christophe; Bhatia, Ravinder
2016-07-01
The purpose of the Observatory Software System (OSW) is to integrate all software and hardware components of the Thirty Meter Telescope (TMT) to enable observations and data capture; thus it is a complex software system that is defined by four principal software subsystems: Common Software (CSW), Executive Software (ESW), Data Management System (DMS) and Science Operations Support System (SOSS), all of which have interdependencies with the observatory control systems and data acquisition systems. Therefore, the software development process and plan must consider dependencies to other subsystems, manage architecture, interfaces and design, manage software scope and complexity, and standardize and optimize use of resources and tools. Additionally, the TMT Observatory Software will largely be developed in India through TMT's workshare relationship with the India TMT Coordination Centre (ITCC) and use of Indian software industry vendors, which adds complexity and challenges to the software development process, communication and coordination of activities and priorities as well as measuring performance and managing quality and risk. The software project management challenge for the TMT OSW is thus a multi-faceted technical, managerial, communications and interpersonal relations challenge. The approach TMT is using to manage this multifaceted challenge is a combination of establishing an effective geographically distributed software team (Integrated Product Team) with strong project management and technical leadership provided by the TMT Project Office (PO) and the ITCC partner to manage plans, process, performance, risk and quality, and to facilitate effective communications; establishing an effective cross-functional software management team composed of stakeholders, OSW leadership and ITCC leadership to manage dependencies and software release plans, technical complexities and change to approved interfaces, architecture, design and tool set, and to facilitate effective communications; adopting an agile-based software development process across the observatory to enable frequent software releases to help mitigate subsystem interdependencies; defining concise scope and work packages for each of the OSW subsystems to facilitate effective outsourcing of software deliverables to the ITCC partner, and to enable performance monitoring and risk management. At this stage, the architecture and high-level design of the software system has been established and reviewed. During construction each subsystem will have a final design phase with reviews, followed by implementation and testing. The results of the TMT approach to the Observatory Software development process will only be preliminary at the time of the submittal of this paper, but it is anticipated that the early results will be a favorable indication of progress.
38 CFR 21.180 - Case status system.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., treatment, and other related services, the VR&E case manager will coordinate with Veterans Health... process have been completed. The case status system will: (1) Assist VR&E staff to fulfill its case... case status at each point in the rehabilitation process. (c) Case manager. The VR&E (Vocational...
38 CFR 21.180 - Case status system.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., treatment, and other related services, the VR&E case manager will coordinate with Veterans Health... process have been completed. The case status system will: (1) Assist VR&E staff to fulfill its case... case status at each point in the rehabilitation process. (c) Case manager. The VR&E (Vocational...
45 CFR 205.35 - Mechanized claims processing and information retrieval systems; definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... State plan requirements for an automated statewide management information system, conditions for FFP and... produce utilization and management information about such aid and services as required by the single State... 45 Public Welfare 2 2010-10-01 2010-10-01 false Mechanized claims processing and information...
[Application of supply chain integration management of medical consumables].
Zhang, Jian
2013-07-01
This paper introduces the background, the content, the information management system of material supply chain integration management and the consumables management process. The system helps to expand the selection of hospital supplies varieties, to reduce consumables management costs, to improve the efficiency of supplies, to ensure supplies safety, reliability and traceability.
Digitalisierung - Management Zwischen 0 und 1
NASA Astrophysics Data System (ADS)
Friedrich, Stefan; Rachholz, Josef
2017-09-01
Digitization as a process of expressing actions and values by codes 0 and 1 has already has become part of our lives. Digitization enables enterprises to improve production, sales and to increase volume of production. However, no standard digitization strategy has been yet developed. Even in the digitized business process management system, the most important position remains to a human being. The improvement of software products, their availability and the education system in the area of introduction and use of information technology is thus a striking feature in development of managing (but also other) current processes.
Code of Federal Regulations, 2014 CFR
2014-01-01
... quantification system; data management and maintenance system; and control, oversight, and validation system for...-supervised institution's advanced IRB systems, operational risk management processes, operational risk data...-length basis between the seller and the obligor (intercompany accounts receivable and receivables subject...
Informational system as an instrument for assessing the performance of the quality management system
NASA Astrophysics Data System (ADS)
Rohan, R.; Roşu, M. M.
2017-08-01
At present there is used a significant number of techniques and methods for diagnosis and management analysis which support the decision-making process. All these methods facilitate reaching the objectives for improving the results through efficiency, quality and customer satisfaction. By developing a methodology for analysing the problems identified in the macro-productive companies there can be brought outstanding benefits to the management and there are offered new perspectives on the critical influencing factors within a system. Through this paper we present an effective management strategy, applicable to an organization with productive profile in order to design an informational system aimed to manage one of its most important and complex systems, namely the coordination of the quality management system. The informational organisation of the quality management system on management principles, ensures an optimization of the informational energy consumption, allowing the management to deal with the following: to ascertain the current situation; to seize the opportunities, but also the potential risks afferent to the organisation policy; to observe the strengths and weaknesses; to take appropriate decisions and then to control the effects obtained. In this way, the decisional factors are able to better understand the available opportunities and to base more efficiently the process of choosing the alternatives.
Integrated, automated revenue management for managed care contracts.
Burckhart, Kent
2002-04-01
Faced with increasing managed care penetration and declining net revenue in recent years, healthcare providers increasingly are emphasizing revenue management. To streamline processes and reduce costs in this area, many healthcare providers have implemented or are considering automated contract management systems. When selecting such a system, healthcare financial managers should make certain that the system can interface with both patient-accounting and decision-support systems of the organization. This integration enhances a healthcare provider's financial viability by providing integrated revenue-management capabilities to analyze projected performance of proposed managed care contracts and actual performance of existing contracts.
78 FR 4038 - Critical Parts for Airplane Propellers
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... requiring a system of processes to identify and manage these parts throughout their service life. This rule... engineering process, a manufacturing process, and a service management process for propeller critical parts... engineering process, to how the part is manufactured and to how the part is maintained in service. Engineering...
[The workplace injury trends in the petrochemical industry: from data analysis to risk management].
Campo, Giuseppe; Martini, Benedetta
2013-01-01
The most recent INAIL data show that, in 2009-2011, the accident frequency rate and the severity rate of workplace injuries in the chemical industry are lower than for the total non-agricultural workforce. The chemical industry, primarily because of the complex and hazardous work processes, requires an appropriate system for assessing and monitoring specific risks.The implementation of Responsible Care, a risk management system specific for the chemical industry, in 1984, has represented a historical step in the process of critical awareness of risk management by the chemical companies. Responsible Care is a risk management system specifically designed on the risk profiles of this type of enterprise, which integrates safety, health and environment. A risk management system, suitable for the needs of a chemical company, should extend its coverage area, beyond the responsible management of products throughout the entire production cycle, to the issues of corporate responsibility.
System Maturity and Architecture Assessment Methods, Processes, and Tools
2012-03-02
Deshmukh , and M. Sarfaraz. Development of Systems Engineering Maturity Models and Management Tools. Systems Engineering Research Center Final Technical...Ramirez- Marquez, D. Nowicki, A. Deshmukh , and M. Sarfaraz. Development of Systems Engineering Maturity Models and Management Tools. Systems Engineering
Martin, J.; Runge, M.C.; Nichols, J.D.; Lubow, B.C.; Kendall, W.L.
2009-01-01
Thresholds and their relevance to conservation have become a major topic of discussion in the ecological literature. Unfortunately, in many cases the lack of a clear conceptual framework for thinking about thresholds may have led to confusion in attempts to apply the concept of thresholds to conservation decisions. Here, we advocate a framework for thinking about thresholds in terms of a structured decision making process. The purpose of this framework is to promote a logical and transparent process for making informed decisions for conservation. Specification of such a framework leads naturally to consideration of definitions and roles of different kinds of thresholds in the process. We distinguish among three categories of thresholds. Ecological thresholds are values of system state variables at which small changes bring about substantial changes in system dynamics. Utility thresholds are components of management objectives (determined by human values) and are values of state or performance variables at which small changes yield substantial changes in the value of the management outcome. Decision thresholds are values of system state variables at which small changes prompt changes in management actions in order to reach specified management objectives. The approach that we present focuses directly on the objectives of management, with an aim to providing decisions that are optimal with respect to those objectives. This approach clearly distinguishes the components of the decision process that are inherently subjective (management objectives, potential management actions) from those that are more objective (system models, estimates of system state). Optimization based on these components then leads to decision matrices specifying optimal actions to be taken at various values of system state variables. Values of state variables separating different actions in such matrices are viewed as decision thresholds. Utility thresholds are included in the objectives component, and ecological thresholds may be embedded in models projecting consequences of management actions. Decision thresholds are determined by the above-listed components of a structured decision process. These components may themselves vary over time, inducing variation in the decision thresholds inherited from them. These dynamic decision thresholds can then be determined using adaptive management. We provide numerical examples (that are based on patch occupancy models) of structured decision processes that include all three kinds of thresholds. ?? 2009 by the Ecological Society of America.
LIU, Tongzhu; SHEN, Aizong; HU, Xiaojian; TONG, Guixian; GU, Wei
2017-01-01
Background: We aimed to apply collaborative business intelligence (BI) system to hospital supply, processing and distribution (SPD) logistics management model. Methods: We searched Engineering Village database, China National Knowledge Infrastructure (CNKI) and Google for articles (Published from 2011 to 2016), books, Web pages, etc., to understand SPD and BI related theories and recent research status. For the application of collaborative BI technology in the hospital SPD logistics management model, we realized this by leveraging data mining techniques to discover knowledge from complex data and collaborative techniques to improve the theories of business process. Results: For the application of BI system, we: (i) proposed a layered structure of collaborative BI system for intelligent management in hospital logistics; (ii) built data warehouse for the collaborative BI system; (iii) improved data mining techniques such as supporting vector machines (SVM) and swarm intelligence firefly algorithm to solve key problems in hospital logistics collaborative BI system; (iv) researched the collaborative techniques oriented to data and business process optimization to improve the business processes of hospital logistics management. Conclusion: Proper combination of SPD model and BI system will improve the management of logistics in the hospitals. The successful implementation of the study requires: (i) to innovate and improve the traditional SPD model and make appropriate implement plans and schedules for the application of BI system according to the actual situations of hospitals; (ii) the collaborative participation of internal departments in hospital including the department of information, logistics, nursing, medical and financial; (iii) timely response of external suppliers. PMID:28828316
Electronic Data Interchange in Procurement
1990-04-01
contract management and order processing systems. This conversion of automated information to paper and back to automated form is not only slow and...automated purchasing computer and the contractor’s order processing computer through telephone lines, as illustrated in Figure 1-1. Computer-to-computer...into the contractor’s order processing or contract management system. This approach - converting automated information to paper and back to automated
An operations management system for the Space Station
NASA Astrophysics Data System (ADS)
Savage, Terry R.
A description is provided of an Operations Management System (OMS) for the planned NASA Space Station. The OMS would be distributed both in space and on the ground, and provide a transparent interface to the communications and data processing facilities of the Space Station Program. The allocation of OMS responsibilities has, in the most current Space Station design, been fragmented among the Communications and Tracking Subsystem (CTS), the Data Management System (DMS), and a redefined OMS. In this current view, OMS is less of a participant in the real-time processing, and more an overseer of the health and management of the Space Station operations.
Total quality management and shared governance: synergistic processes.
Gardner, D B; Cummings, C
1994-01-01
"Synergism" accurately describes the gains that can be made when total quality management (TQM) and shared governance are employed for reciprocal development. This article explores the relationship between TQM and shared governance from a systems perspective. Systems thinking is the fundamental framework that must be learned by nursing managers. An example of this synergistic process is described from the National Institutes of Health nursing department's experience in implementing TQM and shared governance. The idea that structure is fundamental to problems and solutions when implementing change and focusing upon interdependency issues are the systemic competencies nursing managers need to develop in order to become strong nursing leaders.
Demartini, Chiara; Mella, Piero
2014-01-01
This paper shows how the use of performance management systems affects managers' perception of satisfaction, the effectiveness of the control system and the performance related to process innovation. An exploratory empirical research has been conducted on 85 managers operating in Italian healthcare organizations. Empirical findings put forward that the interactive--as opposed to diagnostic--use of performance management systems enhances managerial satisfaction with the control system and managerial perception of effectiveness. The present study then showed that it is not the control itself that is an obstacle to innovation in organizations in general (and in health organizations in particular) but the diagnostic use of the control mechanisms, which impedes the interaction between the control personnel and those subject to the control. Finally, this paper addresses managerial implications and further research avenues. Copyright © 2013 John Wiley & Sons, Ltd.
Meta-manager: a requirements analysis.
Cook, J F; Rozenblit, J W; Chacko, A K; Martinez, R; Timboe, H L
1999-05-01
The digital imaging network-picture-archiving and communications system (DIN-PACS) will be implemented in ten sites within the Great Plains Regional Medical Command (GPRMC). This network of PACS and teleradiology technology over a shared T1 network has opened the door for round the clock radiology coverage of all sites. However, the concept of a virtual radiology environment poses new issues for military medicine. A new workflow management system must be developed. This workflow management system will allow us to efficiently resolve these issues including quality of care, availability, severe capitation, and quality of the workforce. The design process of this management system must employ existing technology, operate over various telecommunication networks and protocols, be independent of platform operating systems, be flexible and scaleable, and involve the end user at the outset in the design process for which it is developed. Using the unified modeling language (UML), the specifications for this new business management system were created in concert between the University of Arizona and the GPRMC. These specifications detail a management system operating through a common object request brokered architecture (CORBA) environment. In this presentation, we characterize the Meta-Manager management system including aspects of intelligence, interfacility routing, fail-safe operations, and expected improvements in patient care and efficiency.
Incident Management: Process into Practice
ERIC Educational Resources Information Center
Isaac, Gayle; Moore, Brian
2011-01-01
Tornados, shootings, fires--these are emergencies that require fast action by school district personnel, but they are not the only incidents that require risk management. The authors have introduced the National Incident Management System (NIMS) and the Incident Command System (ICS) and assured that these systems can help educators plan for and…
Center's ballast water management system website The Marine Safety Center recently updated two tools posted to its ballast water management system website to assist industry when completing the ballast water management system type approval process, or when accessing letters of intent. 5/23/2018: Release of Mission
An Integrated Information System for Supporting Quality Management Tasks
NASA Astrophysics Data System (ADS)
Beyer, N.; Helmreich, W.
2004-08-01
In a competitive environment, well defined processes become the strategic advantage of a company. Hence, targeted Quality Management ensures efficiency, trans- parency and, ultimately, customer satisfaction. In the particular context of a Space Test Centre, a num- ber of specific Quality Management standards have to be applied. According to the revision of ISO 9001 dur- ing 2000, and due to the adaptation of ECSS-Q20-07, process orientation and data analysis are key tasks for ensuring and evaluating the efficiency of a company's processes. In line with these requirements, an integrated management system for accessing the necessary infor- mation to support Quality Management and other proc- esses has been established. Some of its test-related fea- tures are presented here. Easy access to the integrated management system from any work place at IABG's Space Test Centre is ensured by means of an intranet portal. It comprises a full set of quality-related process descriptions, information on test facilities, emergency procedures, and other relevant in- formation. The portal's web interface provides direct access to a couple of external applications. Moreover, easy updating of all information and low cost mainte- nance are features of this integrated information system. The timely and transparent management of non- conformances is covered by a dedicated NCR database which incorporates full documentation capability, elec- tronic signature and e-mail notification of concerned staff. A search interface allows for queries across all documented non-conformances. Furthermore, print ver- sions can be generated at any stage in the process, e.g. for distribution to customers. Feedback on customer satisfaction is sought through a web-based questionnaire. The process is initiated by the responsible test manager through submission of an e- mail that contains a hyperlink to a secure website, ask- ing the customer to complete the brief online form, which is directly fed to a database for subsequent evaluation by the Quality Manager. All such information can be processed and presented in an appropriate manner for internal or external audits, as well as for regular management reviews.
ERIC Educational Resources Information Center
Bozeman, William C.
This study explores the relationships between psychological types of users as identified by the Myers-Briggs Type Indicator and factors associated with the implementation and utilization of the Wisconsin System for Instructional Management (WIS-SIM), a computer management information system designed to support management processes in…
The Study Elements and Indicators of Risk Management System for Secondary Schools in Thailand
ERIC Educational Resources Information Center
Wandee, Methenan; Sirisuthi, Chaiyuth; Leamvijarn, Subunn
2017-01-01
The purposes of this research aimed 1) to study the elements and indicators of risk management system for secondary schools in Thailand. 2) to study suitable the elements and indicators of the risk management system for secondary schools in Thailand. 3) to study the results of CFA (Confirmatory Factors Analysis) risk management process of risk…
NASA Technical Reports Server (NTRS)
Sayers, R. S.
1972-01-01
An information management system is proposed for use in the space shuttle sortie, the modular space station, the tracking data relay satellite and associated ground support systems. Several different information management functions, including data acquisition, transfer, storage, processing, control and display are integrated in the system.
ERIC Educational Resources Information Center
Meier, Terre; Bundy, Larry
The Management Information System (MIS) of the Washington State system of community colleges was designed to be responsive to legislative and district requests for information and to enhance the State Board's capabilities to manage the community college system and integrate its budgeting and planning processes. The MIS consists of seven…
Advancing the practice of systems engineering at JPL
NASA Technical Reports Server (NTRS)
Jansma, Patti A.; Jones, Ross M.
2006-01-01
In FY 2004, JPL launched an initiative to improve the way it practices systems engineering. The Lab's senior management formed the Systems Engineering Advancement (SEA) Project in order to "significantly advance the practice and organizational capabilities of systems engineering at JPL on flight projects and ground support tasks." The scope of the SEA Project includes the systems engineering work performed in all three dimensions of a program, project, or task: 1. the full life-cycle, i.e., concept through end of operations 2. the full depth, i.e., Program, Project, System, Subsystem, Element (SE Levels 1 to 5) 3. the full technical scope, e.g., the flight, ground and launch systems, avionics, power, propulsion, telecommunications, thermal, etc. The initial focus of their efforts defined the following basic systems engineering functions at JPL: systems architecture, requirements management, interface definition, technical resource management, system design and analysis, system verification and validation, risk management, technical peer reviews, design process management and systems engineering task management, They also developed a list of highly valued personal behaviors of systems engineers, and are working to inculcate those behaviors into members of their systems engineering community. The SEA Project is developing products, services, and training to support managers and practitioners throughout the entire system lifecycle. As these are developed, each one needs to be systematically deployed. Hence, the SEA Project developed a deployment process that includes four aspects: infrastructure and operations, communication and outreach, education and training, and consulting support. In addition, the SEA Project has taken a proactive approach to organizational change management and customer relationship management - both concepts and approaches not usually invoked in an engineering environment. This paper'3 describes JPL's approach to advancing the practice of systems engineering at the Lab. It describes the general approach used and how they addressed the three key aspects of change: people, process and technology. It highlights a list of highly valued personal behaviors of systems engineers, discusses the various products, services and training that were developed, describes the deployment approach used, and concludes with several lessons learned.
Visual management system and timber management application
Warren R. Bacon; Asa D. (Bud) Twombly
1979-01-01
This paper includes an illustration of a planning process to guide vegetation management throughout a travel route seen area and over the time period of a total management rotation (100-300 years). The process will produce direction on visual characteristics to be created and maintained within the biological potential and coordinated with associated re-source...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-13
... Evaluation of Recommended Practice on Fatigue Risk Management Systems for Personnel in the Refining and... and Health Administration: 2001-05-I-DE-1 (Process Safety Management coverage of atmospheric storage tanks); 2005-04-I-TX-9 (Process Safety Management requirement for organizational management of change...
Online thesis guidance management information system
NASA Astrophysics Data System (ADS)
Nasution, T. H.; Pratama, F.; Tanjung, K.; Siregar, I.; Amalia, A.
2018-03-01
The development of internet technology in education is still not maximized, especially in the process of thesis guidance between students and lecturers. Difficulties met the lecturers to help students during thesis guidance is the limited communication time and the compatibility of schedule between students and lecturer. To solve this problem, we designed an online thesis guidance management information system that helps students and lecturers to do thesis tutoring process anytime, anywhere. The system consists of a web-based admin app for usage management and an android-based app for students and lecturers.
Code of Federal Regulations, 2014 CFR
2014-01-01
... internal risk rating and segmentation system; risk parameter quantification system; data management and... advanced IRB systems, operational risk management processes, operational risk data and assessment systems... generated on an arm's-length basis between the seller and the obligor (intercompany accounts receivable and...
Code of Federal Regulations, 2014 CFR
2014-01-01
... management and maintenance system; and control, oversight, and validation system for credit risk of wholesale... advanced IRB systems, operational risk management processes, operational risk data and assessment systems... the seller and the obligor (intercompany accounts receivable and receivables subject to contra...
Intelligent Integrated System Health Management
NASA Technical Reports Server (NTRS)
Figueroa, Fernando
2012-01-01
Intelligent Integrated System Health Management (ISHM) is the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system (Management: storage, distribution, sharing, maintenance, processing, reasoning, and presentation). Presentation discusses: (1) ISHM Capability Development. (1a) ISHM Knowledge Model. (1b) Standards for ISHM Implementation. (1c) ISHM Domain Models (ISHM-DM's). (1d) Intelligent Sensors and Components. (2) ISHM in Systems Design, Engineering, and Integration. (3) Intelligent Control for ISHM-Enabled Systems
5 CFR 9701.222 - Reconsideration of classification decisions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... decisions. 9701.222 Section 9701.222 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.222...
[Development and clinical evaluation of an anesthesia information management system].
Feng, Jing-yi; Chen, Hua; Zhu, Sheng-mei
2010-09-21
To study the design, implementation and clinical evaluation of an anesthesia information management system. To record, process and store peri-operative patient data automatically, all kinds of bedside monitoring equipments are connected into the system based on information integrating technology; after a statistical analysis of those patient data by data mining technology, patient status can be evaluated automatically based on risk prediction standard and decision support system, and then anesthetist could perform reasonable and safe clinical processes; with clinical processes electronically recorded, standard record tables could be generated, and clinical workflow is optimized, as well. With the system, kinds of patient data could be collected, stored, analyzed and archived, kinds of anesthesia documents could be generated, and patient status could be evaluated to support clinic decision. The anesthesia information management system is useful for improving anesthesia quality, decreasing risk of patient and clinician, and aiding to provide clinical proof.
Research a Novel Integrated and Dynamic Multi-object Trade-Off Mechanism in Software Project
NASA Astrophysics Data System (ADS)
Jiang, Weijin; Xu, Yuhui
Aiming at practical requirements of present software project management and control, the paper presented to construct integrated multi-object trade-off model based on software project process management, so as to actualize integrated and dynamic trade-oil of the multi-object system of project. Based on analyzing basic principle of dynamic controlling and integrated multi-object trade-off system process, the paper integrated method of cybernetics and network technology, through monitoring on some critical reference points according to the control objects, emphatically discussed the integrated and dynamic multi- object trade-off model and corresponding rules and mechanism in order to realize integration of process management and trade-off of multi-object system.
ADP SYSTEMS ANALYSIS - COMMITTED VS. AVAILABLE MILITARY TRANSPORTATION (LMI T1).
LOGISTICS , * MANAGEMENT ENGINEERING), (*DATA PROCESSING, LOGISTICS), INFORMATION RETRIEVAL, SYSTEMS ENGINEERING, MILITARY TRANSPORTATION, CARGO VEHICLES, SCHEDULING, COMPUTER PROGRAMMING, MANAGEMENT PLANNING AND CONTROL
Knowledge Management Enablers and Process in Hospital Organizations.
Lee, Hyun-Sook
2017-02-01
This research aimed to investigate the effects of knowledge management enablers, such as organizational structure, leadership, learning, information technology systems, trust, and collaboration, on the knowledge management process of creation, storage, sharing, and application. Using data from self-administered questionnaires in four Korean tertiary hospitals, this survey investigated the main organizational factors affecting the knowledge management process in these organizations. A total of 779 questionnaires were analyzed using SPSS 18.0 and AMOS 18.0. The results showed that organizational factors affect the knowledge management process differently in each hospital organization. From a managerial perspective, the implications of these factors for developing organizational strategies that encourage and foster the knowledge management process are discussed.
Integrating the autonomous subsystems management process
NASA Technical Reports Server (NTRS)
Ashworth, Barry R.
1992-01-01
Ways in which the ranking of the Space Station Module Power Management and Distribution testbed may be achieved and an individual subsystem's internal priorities may be managed within the complete system are examined. The application of these results in the integration and performance leveling of the autonomously managed system is discussed.
Managerial Systems as Measures of Quality Management in Universities in Uganda
ERIC Educational Resources Information Center
Neema-Abooki, P.
2014-01-01
This paper envisions that, since universities are basically consent organizations university management has an obligation to processes that engender total participation and passion of all employees. This study aimed at delving into management stances at universities. It based on Likert's systems of management, which depict the total organization…
Towards the Reconciliation of Knowledge Management and e-Collaboration Systems
ERIC Educational Resources Information Center
Le Dinh, Thang; Rinfret, Louis; Raymond, Louis; Dong Thi, Bich-Thuy
2013-01-01
Purpose: The purpose of this paper is to propose an intelligent infrastructure for the reconciliation of knowledge management and e-collaboration systems. Design/Methodology/Approach:Literature on e-collaboration, information management, knowledge management, learning process, and intellectual capital is mobilised in order to build the conceptual…
Multimedia environmental management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Soesilo, J.A.; Wiley, W.D.
1999-09-01
This book explores and supports the argument that effective environmental management must be based on a multimedia approach, which focuses simultaneously on air, water, and waste and enables managers to assess the resulting financial, operation, and management benefits. The multimedia approach, which can be used to design an effective compliance program, includes proper waste and material handling management, systematic monitoring, and record keeping requirements. This approach integrates a wide array of environmental requirements and decision processes, which the authors examine in sixteen chapters, organized into four parts: the role of environmental management; environmental aspects of business operation, environmental processes; andmore » environmental management trends. Within these parts, the authors highlight the development of modern environmental management and provide an overview of federal laws pertinent to multimedia environmental management. They examine such issues as chemical storage and transportation, tank system operations and requirements, waste determination, spill response procedures, and employee training. Environmental processes addressed in the book include the management of solid and hazardous waste, wastewater treatment systems, stormwater management, air emission control, and site remediation. The authors also briefly discuss significant initiatives in US environmental management and look toward corporate sustainable development.« less
2009-09-01
this information supports the decison - making process as it is applied to the management of risk. 2. Operational Risk Operational risk is the threat... reasonability . However, to make a software system fault tolerant, the system needs to recognize and fix a system state condition. To detect a fault, a fault...Tracking ..........................................51 C. DECISION- MAKING PROCESS................................................................51 1. Risk
ERIC Educational Resources Information Center
Schure, Alexander
A computer-based system model for the monitoring and management of the instructional process was conceived, developed and refined through the techniques of systems analysis. This report describes the various aspects and components of this project in a series of independent and self-contained units. The first unit provides an overview of the entire…
NASA Technical Reports Server (NTRS)
Gaulene, P.
1986-01-01
The SEE data processing system, developed in 1985, manages and process test results. General information is provided on the SEE system: objectives, characteristics, basic principles, general organization, and operation. Full documentation is accessible by computer using the HELP SEE command.
A Multi Agent Based Approach for Prehospital Emergency Management.
Safdari, Reza; Shoshtarian Malak, Jaleh; Mohammadzadeh, Niloofar; Danesh Shahraki, Azimeh
2017-07-01
To demonstrate an architecture to automate the prehospital emergency process to categorize the specialized care according to the situation at the right time for reducing the patient mortality and morbidity. Prehospital emergency process were analyzed using existing prehospital management systems, frameworks and the extracted process were modeled using sequence diagram in Rational Rose software. System main agents were identified and modeled via component diagram, considering the main system actors and by logically dividing business functionalities, finally the conceptual architecture for prehospital emergency management was proposed. The proposed architecture was simulated using Anylogic simulation software. Anylogic Agent Model, State Chart and Process Model were used to model the system. Multi agent systems (MAS) had a great success in distributed, complex and dynamic problem solving environments, and utilizing autonomous agents provides intelligent decision making capabilities. The proposed architecture presents prehospital management operations. The main identified agents are: EMS Center, Ambulance, Traffic Station, Healthcare Provider, Patient, Consultation Center, National Medical Record System and quality of service monitoring agent. In a critical condition like prehospital emergency we are coping with sophisticated processes like ambulance navigation health care provider and service assignment, consultation, recalling patients past medical history through a centralized EHR system and monitoring healthcare quality in a real-time manner. The main advantage of our work has been the multi agent system utilization. Our Future work will include proposed architecture implementation and evaluation of its impact on patient quality care improvement.
A Multi Agent Based Approach for Prehospital Emergency Management
Safdari, Reza; Shoshtarian Malak, Jaleh; Mohammadzadeh, Niloofar; Danesh Shahraki, Azimeh
2017-01-01
Objective: To demonstrate an architecture to automate the prehospital emergency process to categorize the specialized care according to the situation at the right time for reducing the patient mortality and morbidity. Methods: Prehospital emergency process were analyzed using existing prehospital management systems, frameworks and the extracted process were modeled using sequence diagram in Rational Rose software. System main agents were identified and modeled via component diagram, considering the main system actors and by logically dividing business functionalities, finally the conceptual architecture for prehospital emergency management was proposed. The proposed architecture was simulated using Anylogic simulation software. Anylogic Agent Model, State Chart and Process Model were used to model the system. Results: Multi agent systems (MAS) had a great success in distributed, complex and dynamic problem solving environments, and utilizing autonomous agents provides intelligent decision making capabilities. The proposed architecture presents prehospital management operations. The main identified agents are: EMS Center, Ambulance, Traffic Station, Healthcare Provider, Patient, Consultation Center, National Medical Record System and quality of service monitoring agent. Conclusion: In a critical condition like prehospital emergency we are coping with sophisticated processes like ambulance navigation health care provider and service assignment, consultation, recalling patients past medical history through a centralized EHR system and monitoring healthcare quality in a real-time manner. The main advantage of our work has been the multi agent system utilization. Our Future work will include proposed architecture implementation and evaluation of its impact on patient quality care improvement. PMID:28795061
Efficiency improvement of technological preparation of power equipment manufacturing
NASA Astrophysics Data System (ADS)
Milukov, I. A.; Rogalev, A. N.; Sokolov, V. P.; Shevchenko, I. V.
2017-11-01
Competitiveness of power equipment primarily depends on speeding-up the development and mastering of new equipment samples and technologies, enhancement of organisation and management of design, manufacturing and operation. Actual political, technological and economic conditions cause the acute need in changing the strategy and tactics of process planning. At that the issues of maintenance of equipment with simultaneous improvement of its efficiency and compatibility to domestically produced components are considering. In order to solve these problems, using the systems of computer-aided process planning for process design at all stages of power equipment life cycle is economically viable. Computer-aided process planning is developed for the purpose of improvement of process planning by using mathematical methods and optimisation of design and management processes on the basis of CALS technologies, which allows for simultaneous process design, process planning organisation and management based on mathematical and physical modelling of interrelated design objects and production system. An integration of computer-aided systems providing the interaction of informative and material processes at all stages of product life cycle is proposed as effective solution to the challenges in new equipment design and process planning.
Strategic Project Management at the NASA Kennedy Space Center
NASA Technical Reports Server (NTRS)
Lavelle, Jerome P.
2000-01-01
This paper describes Project Management at NASA's Kennedy Space Center (KSC) from a strategic perspective. It develops the historical context of the agency and center's strategic planning process and illustrates how now is the time for KSC to become a center which has excellence in project management. The author describes project management activities at the center and details observations on those efforts. Finally the author describes the Strategic Project Management Process Model as a conceptual model which could assist KSC in defining an appropriate project management process system at the center.
Quality transitivity and traceability system of herbal medicine products based on quality markers.
Liu, Changxiao; Guo, De-An; Liu, Liang
2018-05-15
Due to a variety of factors to affect the herb quality, the existing quality management model is unable to evaluate the process control. The development of the concept of "quality marker" (Q-marker) lays basis for establishing an independent process quality control system for herbal products. To ensure the highest degree of safety, effectiveness and quality process control of herbal products, it is aimed to establish a quality transitivity and traceability system of quality and process control from raw materials to finished herbal products. Based on the key issues and challenges of quality assessment, the current status of quality and process controls from raw materials to herbal medicinal products listed in Pharmacopoeia were analyzed and the research models including discovery and identification of Q-markers, analysis and quality management of risk evaluation were designed. Authors introduced a few new technologies and methodologies, such as DNA barcoding, chromatographic technologies, fingerprint analysis, chemical markers, bio-responses, risk management and solution for quality process control. The quality and process control models for herbal medicinal products were proposed and the transitivity and traceability system from raw materials to the finished products was constructed to improve the herbal quality from the entire supply and production chain. The transitivity and traceability system has been established based on quality markers, especially on how to control the production process under Good Engineering Practices, as well as to implement the risk management for quality and process control in herbal medicine production. Copyright © 2018 Elsevier GmbH. All rights reserved.
Systems Thinking for the Enterprise: A Thought Piece
NASA Astrophysics Data System (ADS)
Rebovich, George
This paper suggests a way of managing the acquisition of capabilities for large-scale government enterprises that is different from traditional "specify and build" approaches commonly employed by U.S. government agencies in acquiring individual systems or systems of systems (SoS). Enterprise capabilities evolve through the emergence and convergence of information and other technologies and their integration into social, institutional and operational organizations and processes. Enterprise capabilities evolve whether or not the enterprise has processes in place to actively manage them. Thus the critical role of enterprise system engineering (ESE) processes should be to shape, enhance and accelerate the "natural" evolution of enterprise capabilities. ESE processes do not replace or add a layer to traditional system engineering (TSE) processes used in developing individual systems or SoS. ESE processes should complement TSE processes by shaping outcome spaces and stimulating interactions among enterprise participants through marketlike mechanisms to reward those that create innovation which moves and accelerates the evolution of the enterprise.
Cartmill, Randi S; Walker, James M; Blosky, Mary Ann; Brown, Roger L; Djurkovic, Svetolik; Dunham, Deborah B; Gardill, Debra; Haupt, Marilyn T; Parry, Dean; Wetterneck, Tosha B; Wood, Kenneth E; Carayon, Pascale
2012-11-01
To examine the effect of implementing electronic order management on the timely administration of antibiotics to critical-care patients. We used a prospective pre-post design, collecting data on first-dose IV antibiotic orders before and after the implementation of an integrated electronic medication-management system, which included computerized provider order entry (CPOE), pharmacy order processing and an electronic medication administration record (eMAR). The research was performed in a 24-bed adult medical/surgical ICU in a large, rural, tertiary medical center. Data on the time of ordering, pharmacy processing and administration were prospectively collected and time intervals for each stage and the overall process were calculated. The overall turnaround time from ordering to administration significantly decreased from a median of 100 min before order management implementation to a median of 64 min after implementation. The first part of the medication use process, i.e., from order entry to pharmacy processing, improved significantly whereas no change was observed in the phase from pharmacy processing to medication administration. The implementation of an electronic order-management system improved the timeliness of antibiotic administration to critical-care patients. Additional system changes are required to further decrease the turnaround time. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.
ERIC Educational Resources Information Center
Aldowaisan, Tariq; Allahverdi, Ali
2016-01-01
This paper describes the process of developing programme educational objectives (PEOs) for the Industrial and Management Systems Engineering programme at Kuwait University, and the process of deployment of these PEOs. Input of the four constituents of the programme, faculty, students, alumni, and employers, is incorporated in the development and…
It Systems Supporting the Management of Production Capacity
NASA Astrophysics Data System (ADS)
Milewska, Elżbieta
2017-03-01
The paper presents the problem of manufacturing process flexibility in view of a company's material and information flow stream management. The author of the article has described the functions of a production process control system and presented the characteristics of production capacity intensive and extensive reserves. The MRP II/ERP, MES and APS class IT tools supporting the process of production planning, organization and control have also been discussed.
41 CFR 105-60.405 - Processing requests for confidential commercial information.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Processing requests for confidential commercial information. 105-60.405 Section 105-60.405 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional...
41 CFR 105-60.405 - Processing requests for confidential commercial information.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Processing requests for confidential commercial information. 105-60.405 Section 105-60.405 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional...
41 CFR 105-60.405 - Processing requests for confidential commercial information.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Processing requests for confidential commercial information. 105-60.405 Section 105-60.405 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional...
Benefits of an automated GLP final report preparation software solution.
Elvebak, Larry E
2011-07-01
The final product of analytical laboratories performing US FDA-regulated (or GLP) method validation and bioanalysis studies is the final report. Although there are commercial-off-the-shelf (COTS) software/instrument systems available to laboratory managers to automate and manage almost every aspect of the instrumental and sample-handling processes of GLP studies, there are few software systems available to fully manage the GLP final report preparation process. This lack of appropriate COTS tools results in the implementation of rather Byzantine and manual processes to cobble together all the information needed to generate a GLP final report. The manual nature of these processes results in the need for several iterative quality control and quality assurance events to ensure data accuracy and report formatting. The industry is in need of a COTS solution that gives laboratory managers and study directors the ability to manage as many portions as possible of the GLP final report writing process and the ability to generate a GLP final report with the click of a button. This article describes the COTS software features needed to give laboratory managers and study directors such a solution.
Exemplars in the use of technology for management of depression in primary care.
Serrano, Neftali; Molander, Rachel; Monden, Kimberley; Grosshans, Ashley; Krahn, Dean D
2012-06-01
Depression care management as part of larger efforts to integrate behavioral health care into primary care has been shown to be effective in helping patients and primary care clinicians achieve improved outcomes within the primary care environment. Central to care management systems is the use of registries which enable effective clinic population management. The aim of this article is to detail the methods and utility of technology in depression care management processes while also highlighting the real-world variations and barriers that exist in different clinical environments, namely a federally qualified health center and a Veterans Administration clinic. We analyzed descriptive data from the registries of Access Community Health Centers and the William S. Middleton Veterans Administration clinics along with historical reviews of their respective care management processes. Both registry reviews showed trend data indicating improvement in scores of depression and provided baseline data on important system variables, such as the number of patients who are not making progress, the percentage of patients who are unreachable by phone, and the kind of actions needed to ensure evidence-based and efficient care. Both sites also highlighted systemic technical barriers to more complete implementation of care management processes. Care management processes are an effective and efficient part of population-based care for depression in primary care. Implementation depends on available resources including hardware, software, and clinical personnel. Additionally, care management processes and technology have evolved over time based on local needs and are part of an integrated method to support the work of primary care clinicians in providing care for patients with depression.
TheHiveDB image data management and analysis framework.
Muehlboeck, J-Sebastian; Westman, Eric; Simmons, Andrew
2014-01-06
The hive database system (theHiveDB) is a web-based brain imaging database, collaboration, and activity system which has been designed as an imaging workflow management system capable of handling cross-sectional and longitudinal multi-center studies. It can be used to organize and integrate existing data from heterogeneous projects as well as data from ongoing studies. It has been conceived to guide and assist the researcher throughout the entire research process, integrating all relevant types of data across modalities (e.g., brain imaging, clinical, and genetic data). TheHiveDB is a modern activity and resource management system capable of scheduling image processing on both private compute resources and the cloud. The activity component supports common image archival and management tasks as well as established pipeline processing (e.g., Freesurfer for extraction of scalar measures from magnetic resonance images). Furthermore, via theHiveDB activity system algorithm developers may grant access to virtual machines hosting versioned releases of their tools to collaborators and the imaging community. The application of theHiveDB is illustrated with a brief use case based on organizing, processing, and analyzing data from the publically available Alzheimer Disease Neuroimaging Initiative.
TheHiveDB image data management and analysis framework
Muehlboeck, J-Sebastian; Westman, Eric; Simmons, Andrew
2014-01-01
The hive database system (theHiveDB) is a web-based brain imaging database, collaboration, and activity system which has been designed as an imaging workflow management system capable of handling cross-sectional and longitudinal multi-center studies. It can be used to organize and integrate existing data from heterogeneous projects as well as data from ongoing studies. It has been conceived to guide and assist the researcher throughout the entire research process, integrating all relevant types of data across modalities (e.g., brain imaging, clinical, and genetic data). TheHiveDB is a modern activity and resource management system capable of scheduling image processing on both private compute resources and the cloud. The activity component supports common image archival and management tasks as well as established pipeline processing (e.g., Freesurfer for extraction of scalar measures from magnetic resonance images). Furthermore, via theHiveDB activity system algorithm developers may grant access to virtual machines hosting versioned releases of their tools to collaborators and the imaging community. The application of theHiveDB is illustrated with a brief use case based on organizing, processing, and analyzing data from the publically available Alzheimer Disease Neuroimaging Initiative. PMID:24432000
An Introduction to Database Structure and Database Machines.
ERIC Educational Resources Information Center
Detweiler, Karen
1984-01-01
Enumerates principal management objectives of database management systems (data independence, quality, security, multiuser access, central control) and criteria for comparison (response time, size, flexibility, other features). Conventional database management systems, relational databases, and database machines used for backend processing are…
NASA Astrophysics Data System (ADS)
Koon, Phillip L.; Greene, Scott
2002-07-01
Our aerospace customers are demanding that we drastically reduce the cost of operating and supporting our products. Our space customer in particular is looking for the next generation of reusable launch vehicle systems to support more aircraft like operation. To achieve this goal requires more than an evolution in materials, processes and systems, what is required is a paradigm shift in the design of the launch vehicles and the processing systems that support the launch vehicles. This paper describes the Automated Informed Maintenance System (AIM) we are developing for NASA's Space Launch Initiative (SLI) Second Generation Reusable Launch Vehicle (RLV). Our system includes an Integrated Health Management (IHM) system for the launch vehicles and ground support systems, which features model based diagnostics and prognostics. Health Management data is used by our AIM decision support and process aids to automatically plan maintenance, generate work orders and schedule maintenance activities along with the resources required to execute these processes. Our system will automate the ground processing for a spaceport handling multiple RLVs executing multiple missions. To accomplish this task we are applying the latest web based distributed computing technologies and application development techniques.
The Careful Puppet Master: Reducing risk and fortifying acceptance testing with Jenkins CI
NASA Astrophysics Data System (ADS)
Smith, Jason A.; Richman, Gabriel; DeStefano, John; Pryor, James; Rao, Tejas; Strecker-Kellogg, William; Wong, Tony
2015-12-01
Centralized configuration management, including the use of automation tools such as Puppet, can greatly increase provisioning speed and efficiency when configuring new systems or making changes to existing systems, reduce duplication of work, and improve automated processes. However, centralized management also brings with it a level of inherent risk: a single change in just one file can quickly be pushed out to thousands of computers and, if that change is not properly and thoroughly tested and contains an error, could result in catastrophic damage to many services, potentially bringing an entire computer facility offline. Change management procedures can—and should—be formalized in order to prevent such accidents. However, like the configuration management process itself, if such procedures are not automated, they can be difficult to enforce strictly. Therefore, to reduce the risk of merging potentially harmful changes into our production Puppet environment, we have created an automated testing system, which includes the Jenkins CI tool, to manage our Puppet testing process. This system includes the proposed changes and runs Puppet on a pool of dozens of RedHat Enterprise Virtualization (RHEV) virtual machines (VMs) that replicate most of our important production services for the purpose of testing. This paper describes our automated test system and how it hooks into our production approval process for automatic acceptance testing. All pending changes that have been pushed to production must pass this validation process before they can be approved and merged into production.
AOIPS water resources data management system
NASA Technical Reports Server (NTRS)
Merritt, E. S.; Shotwell, R. L.; Place, M. C.; Belknap, N. J.
1976-01-01
A geocoded data management system applicable for hydrological applications was designed to demonstrate the utility of the Atmospheric and Oceanographic Information Processing System (AOIPS) for hydrological applications. Within that context, the geocoded hydrology data management system was designed to take advantage of the interactive capability of the AOIPS hardware. Portions of the Water Resource Data Management System which best demonstrate the interactive nature of the hydrology data management system were implemented on the AOIPS. A hydrological case study was prepared using all data supplied for the Bear River watershed located in northwest Utah, southeast Idaho, and western Wyoming.
NASA Technical Reports Server (NTRS)
Campbell, William J.
1985-01-01
Intelligent data management is the concept of interfacing a user to a database management system with a value added service that will allow a full range of data management operations at a high level of abstraction using human written language. The development of such a system will be based on expert systems and related artificial intelligence technologies, and will allow the capturing of procedural and relational knowledge about data management operations and the support of a user with such knowledge in an on-line, interactive manner. Such a system will have the following capabilities: (1) the ability to construct a model of the users view of the database, based on the query syntax; (2) the ability to transform English queries and commands into database instructions and processes; (3) the ability to use heuristic knowledge to rapidly prune the data space in search processes; and (4) the ability to use an on-line explanation system to allow the user to understand what the system is doing and why it is doing it. Additional information is given in outline form.
Traceability System For Agricultural Productsbased on Rfid and Mobile Technology
NASA Astrophysics Data System (ADS)
Sugahara, Koji
In agriculture, it is required to establish and integrate food traceability systems and risk management systems in order to improve food safety in the entire food chain. The integrated traceability system for agricultural products was developed, based on innovative technology of RFID and mobile computing. In order to identify individual products on the distribution process efficiently,small RFID tags with unique ID and handy RFID readers were applied. On the distribution process, the RFID tags are checked by using the readers, and transit records of the products are stored to the database via wireless LAN.Regarding agricultural production, the recent issues of pesticides misuse affect consumer confidence in food safety. The Navigation System for Appropriate Pesticide Use (Nouyaku-navi) was developed, which is available in the fields by Internet cell-phones. Based on it, agricultural risk management systems have been developed. These systems collaborate with traceability systems and they can be applied for process control and risk management in agriculture.
NASA Technical Reports Server (NTRS)
Southall, J. W.
1979-01-01
The engineering-specified requirements for integrated information processing by means of the Integrated Programs for Aerospace-Vehicle Design (IPAD) system are presented. A data model is described and is based on the design process of a typical aerospace vehicle. General data management requirements are specified for data storage, retrieval, generation, communication, and maintenance. Information management requirements are specified for a two-component data model. In the general portion, data sets are managed as entities, and in the specific portion, data elements and the relationships between elements are managed by the system, allowing user access to individual elements for the purpose of query. Computer program management requirements are specified for support of a computer program library, control of computer programs, and installation of computer programs into IPAD.
A support architecture for reliable distributed computing systems
NASA Technical Reports Server (NTRS)
Mckendry, Martin S.
1986-01-01
The Clouds kernel design was through several design phases and is nearly complete. The object manager, the process manager, the storage manager, the communications manager, and the actions manager are examined.
ballast water « Coast Guard Maritime Commons
updates to Marine Safety Center's ballast water management system website The Marine Safety Center recently updated two tools posted to its ballast water management system website to assist industry when completing the ballast water management system type approval process, or when accessing letters of intent. 12
Commercial Vessel Compliance « Coast Guard Maritime Commons
updates to Marine Safety Center's ballast water management system website The Marine Safety Center recently updated two tools posted to its ballast water management system website to assist industry when completing the ballast water management system type approval process, or when accessing letters of intent. 5
NASA Astrophysics Data System (ADS)
Vasil'ev, V. A.; Dobrynina, N. V.
2017-01-01
The article presents data on the influence of information upon the functioning of complex systems in the process of ensuring their effective management. Ways and methods for evaluating multidimensional information that reduce time and resources, improve the validity of the studied system management decisions, were proposed.
Decision support system for nursing management control
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ernst, C.J.
A knowledge representation approach for expert systems supporting decision processes in business is proposed. A description of a knowledge representation schema using a logic programming metalanguage is described, then the role of such a schema in a management expert system is demonstrated through the problem of nursing management control in hospitals. 18 references.
Roman-Viñas, Ramón
2010-02-01
In this work some of the fundamentals of change management techniques to ensure the introduction of information and communication technologies in health organizations are analized. Managing change is aimed at redirecting the impact of any transformation process in the organizations towards a positive attitude and enthusiasm of those involved. That is, this paper analyzes the most important of all factors that must be managed in any project for change: the human factor. If a proper change management is a critical success factor in implementing new processes and systems of information and communication technologies (ICT) in an organization, when we faced with the introduction of new processes and interoperability systems between different organizations, cooperation, leadership and motivation of individuals focused on a common goal is absolutely imperative. This is the case of the new ICT systems being introduced in the Catalan Health System. Indeed, by definition of the model itself, in Catalonia, continuity of care, increased efficiency and effectiveness and quality improvement of projects as the clinical history shared, electronic prescriptions, or scanning medical imaging, require necessarily the definition of processes in which a large number of different health organizations, different in their law status, and whose own interests should converge towards the ICT systems and processes of health care so that the contribution of all parties can make a whole. The success of these projects, a reality nowadays, is due largely to the management of the human factor conducted continuously since its inception. 2010 Elsevier España S.L. All rights reserved.
1983-03-01
Sysiem are: Order processinq coordinators Order processing management Credit and collections Accounts receivable Support management Admin ianagemenr...or sales secretary, then by order processing (OP). Phone-in orders go directly to OP. The infor- mation is next Transcribed onto an order entry... ORDER PROCESSING : The central systems validate The order items and codes t!, processing them against the customer file, the prodicT or PA? ts file, and
Event Processing and Variable Part of Sample Period Determining in Combined Systems Using GA
NASA Astrophysics Data System (ADS)
Strémy, Maximilián; Závacký, Pavol; Jedlička, Martin
2011-01-01
This article deals with combined dynamic systems and usage of modern techniques in dealing with these systems, focusing particularly on sampling period design, cyclic processing tasks and related processing algorithms in the combined event management systems using genetic algorithms.
Classification of cognitive systems dedicated to data sharing
NASA Astrophysics Data System (ADS)
Ogiela, Lidia; Ogiela, Marek R.
2017-08-01
In this paper will be presented classification of new cognitive information systems dedicated to cryptographic data splitting and sharing processes. Cognitive processes of semantic data analysis and interpretation, will be used to describe new classes of intelligent information and vision systems. In addition, cryptographic data splitting algorithms and cryptographic threshold schemes will be used to improve processes of secure and efficient information management with application of such cognitive systems. The utility of the proposed cognitive sharing procedures and distributed data sharing algorithms will be also presented. A few possible application of cognitive approaches for visual information management and encryption will be also described.
NASA Astrophysics Data System (ADS)
Maksimov, N. V.; Tikhomirov, G. V.; Golitsyna, O. L.
2017-01-01
The main problems and circumstances that influence the processes of creating effective knowledge management systems were described. These problems particularly include high species diversity of instruments for knowledge representation, lack of adequate lingware, including formal representation of semantic relationships. For semantic data descriptions development a conceptual model of the subject area and a conceptual-lexical system should be designed on proposals of ISO-15926 standard. It is proposed to conduct an information integration of educational and production processes on the basis of information systems technologies. Integrated knowledge management system information environment combines both traditional information resources and specific information resources of subject domain including task context and implicit/tacit knowledge.
Parallel processing for scientific computations
NASA Technical Reports Server (NTRS)
Alkhatib, Hasan S.
1991-01-01
The main contribution of the effort in the last two years is the introduction of the MOPPS system. After doing extensive literature search, we introduced the system which is described next. MOPPS employs a new solution to the problem of managing programs which solve scientific and engineering applications on a distributed processing environment. Autonomous computers cooperate efficiently in solving large scientific problems with this solution. MOPPS has the advantage of not assuming the presence of any particular network topology or configuration, computer architecture, or operating system. It imposes little overhead on network and processor resources while efficiently managing programs concurrently. The core of MOPPS is an intelligent program manager that builds a knowledge base of the execution performance of the parallel programs it is managing under various conditions. The manager applies this knowledge to improve the performance of future runs. The program manager learns from experience.
MONTANO, Diego
2016-01-01
The present study proposes a set of quality requirements to management practices by taking into account the empirical evidence on their potential effects on health, the systemic nature of social organisations, and the current conceptualisations of management functions within the framework of comprehensive quality management systems. Systematic reviews and meta-analyses focusing on the associations between leadership and/or supervision and health in occupational settings are evaluated, and the core elements of an ISO 9001 standardisation approach are presented. Six major occupational health requirements to high-quality management practices are identified pertaining to communication processes, organisational justice, role clarity, decision making, social influence processes and management support. It is concluded that the quality of management practices may be improved by developing a quality management system of management practices that ensures not only conformity to product but also to occupational safety and health requirements. Further research may evaluate the practicability of the proposed approach. PMID:26860787
Montano, Diego
2016-08-05
The present study proposes a set of quality requirements to management practices by taking into account the empirical evidence on their potential effects on health, the systemic nature of social organisations, and the current conceptualisations of management functions within the framework of comprehensive quality management systems. Systematic reviews and meta-analyses focusing on the associations between leadership and/or supervision and health in occupational settings are evaluated, and the core elements of an ISO 9001 standardisation approach are presented. Six major occupational health requirements to high-quality management practices are identified pertaining to communication processes, organisational justice, role clarity, decision making, social influence processes and management support. It is concluded that the quality of management practices may be improved by developing a quality management system of management practices that ensures not only conformity to product but also to occupational safety and health requirements. Further research may evaluate the practicability of the proposed approach.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hiroyoshi Ueda; Katsuhiko Ishiguro; Kazumi Kitayama
2007-07-01
NUMO (Nuclear Waste Management Organization of Japan) has a responsibility for implementing geological disposal of vitrified HLW (High-Level radioactive Waste) in the Japanese nuclear waste management programme. Its staged siting procedure was initiated in 2002 by an open call for volunteer sites. Careful management strategy and methodology for the technical decision-making at every milestone are required to prepare for the volunteer site application and the site investigation stages after that. The formal Requirement Management System (RMS) is planned to support the computerized implementation of the specific management methodology, termed the NUMO Structured Approach (NSA). This planned RMS will help formore » comprehensive management of the decision-making processes in the geological disposal project, change management towards the anticipated project deviations, efficient project driving such as well programmed R and D etc. and structured record-keeping regarding the past decisions, which leads to soundness of the project in terms of the long-term continuity. The system should have handling/management functions for the database including the decisions/requirements in the project in consideration, their associated information and the structures composed of them in every decision-making process. The information relating to the premises, boundary conditions and time plan of the project should also be prepared in the system. Effective user interface and efficient operation on the in-house network are necessary. As a living system for the long-term formal use, flexibility to updating is indispensable. In advance of the formal system development, two-year activity to develop the preliminary RMS was already started. The purpose of this preliminary system is to template the decision/requirement structure, prototype the decision making management and thus show the feasibility of the innovative RMS. The paper describes the current status of the development, focusing on the initial stage including work analysis/modeling and the system conceptualization. (authors)« less
Intelligent systems/software engineering methodology - A process to manage cost and risk
NASA Technical Reports Server (NTRS)
Friedlander, Carl; Lehrer, Nancy
1991-01-01
A systems development methodology is discussed that has been successfully applied to the construction of a number of intelligent systems. This methodology is a refinement of both evolutionary and spiral development methodologies. It is appropriate for development of intelligent systems. The application of advanced engineering methodology to the development of software products and intelligent systems is an important step toward supporting the transition of AI technology into aerospace applications. A description of the methodology and the process model from which it derives is given. Associated documents and tools are described which are used to manage the development process and record and report the emerging design.
Improving data collection processes for routine evaluation of treatment cost-effectiveness.
Monto, Sari; Penttilä, Riku; Kärri, Timo; Puolakka, Kari; Valpas, Antti; Talonpoika, Anna-Maria
2016-04-01
The healthcare system in Finland has begun routine collection of health-related quality of life (HRQoL) information for patients in hospitals to support more systematic cost-effectiveness analysis (CEA). This article describes the systematic collection of HRQoL survey data, and addresses challenges in the implementation of patient surveys and acquisition of cost data in the case hospital. Challenges include problems with incomplete data and undefined management processes. In order to support CEA of hospital treatments, improvements are sought from the process management literature and in the observation of healthcare professionals. The article has been written from an information system and process management perspective, concluding that process ownership, automation of data collection and better staff training are keys to generating more reliable data.
Engaging stakeholders for adaptive management using structured decision analysis
Irwin, Elise R.; Kathryn, D.; Kennedy, Mickett
2009-01-01
Adaptive management is different from other types of management in that it includes all stakeholders (versus only policy makers) in the process, uses resource optimization techniques to evaluate competing objectives, and recognizes and attempts to reduce uncertainty inherent in natural resource systems. Management actions are negotiated by stakeholders, monitored results are compared to predictions of how the system should respond, and management strategies are adjusted in a “monitor-compare-adjust” iterative routine. Many adaptive management projects fail because of the lack of stakeholder identification, engagement, and continued involvement. Primary reasons for this vary but are usually related to either stakeholders not having ownership (or representation) in decision processes or disenfranchisement of stakeholders after adaptive management begins. We present an example in which stakeholders participated fully in adaptive management of a southeastern regulated river. Structured decision analysis was used to define management objectives and stakeholder values and to determine initial flow prescriptions. The process was transparent, and the visual nature of the modeling software allowed stakeholders to see how their interests and values were represented in the decision process. The development of a stakeholder governance structure and communication mechanism has been critical to the success of the project.
Benefits of information technology-enabled diabetes management.
Bu, Davis; Pan, Eric; Walker, Janice; Adler-Milstein, Julia; Kendrick, David; Hook, Julie M; Cusack, Caitlin M; Bates, David W; Middleton, Blackford
2007-05-01
To determine the financial and clinical benefits of implementing information technology (IT)-enabled disease management systems. A computer model was created to project the impact of IT-enabled disease management on care processes, clinical outcomes, and medical costs for patients with type 2 diabetes aged >25 years in the U.S. Several ITs were modeled (e.g., diabetes registries, computerized decision support, remote monitoring, patient self-management systems, and payer-based systems). Estimates of care process improvements were derived from published literature. Simulations projected outcomes for both payer and provider organizations, scaled to the national level. The primary outcome was medical cost savings, in 2004 U.S. dollars discounted at 5%. Secondary measures include reduction of cardiovascular, cerebrovascular, neuropathy, nephropathy, and retinopathy clinical outcomes. All forms of IT-enabled disease management improved the health of patients with diabetes and reduced health care expenditures. Over 10 years, diabetes registries saved $14.5 billion, computerized decision support saved $10.7 billion, payer-centered technologies saved $7.10 billion, remote monitoring saved $326 million, self-management saved $285 million, and integrated provider-patient systems saved $16.9 billion. IT-enabled diabetes management has the potential to improve care processes, delay diabetes complications, and save health care dollars. Of existing systems, provider-centered technologies such as diabetes registries currently show the most potential for benefit. Fully integrated provider-patient systems would have even greater potential for benefit. These benefits must be weighed against the implementation costs.
Kollikkathara, Naushad; Feng, Huan; Yu, Danlin
2010-11-01
As planning for sustainable municipal solid waste management has to address several inter-connected issues such as landfill capacity, environmental impacts and financial expenditure, it becomes increasingly necessary to understand the dynamic nature of their interactions. A system dynamics approach designed here attempts to address some of these issues by fitting a model framework for Newark urban region in the US, and running a forecast simulation. The dynamic system developed in this study incorporates the complexity of the waste generation and management process to some extent which is achieved through a combination of simpler sub-processes that are linked together to form a whole. The impact of decision options on the generation of waste in the city, on the remaining landfill capacity of the state, and on the economic cost or benefit actualized by different waste processing options are explored through this approach, providing valuable insights into the urban waste-management process. Copyright © 2010 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kollikkathara, Naushad, E-mail: naushadkp@gmail.co; Feng Huan; Yu Danlin
2010-11-15
As planning for sustainable municipal solid waste management has to address several inter-connected issues such as landfill capacity, environmental impacts and financial expenditure, it becomes increasingly necessary to understand the dynamic nature of their interactions. A system dynamics approach designed here attempts to address some of these issues by fitting a model framework for Newark urban region in the US, and running a forecast simulation. The dynamic system developed in this study incorporates the complexity of the waste generation and management process to some extent which is achieved through a combination of simpler sub-processes that are linked together to formmore » a whole. The impact of decision options on the generation of waste in the city, on the remaining landfill capacity of the state, and on the economic cost or benefit actualized by different waste processing options are explored through this approach, providing valuable insights into the urban waste-management process.« less
Engineering the Business of Defense Acquisition: An Analysis of Program Office Processes
2015-05-01
Information Technology and Business Process Redesign | MIT Sloan Management Review . MIT Sloan Management Review . Retrieved from http://sloanreview.mit.edu...links systems management to process execution Three Phases/ Multi-Year Effort (This Phase) Literature review Model development— Formal and...estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining
Closing Intelligence Gaps: Synchronizing the Collection Management Process
information flow. The US military divides the world into six distinct geographic areas with corresponding commanders managing risk and weighing...analyzed information , creating a mismatch between supply and demand. The result is a burden on all facets of the intelligence process. However, if the target...system, or problem requiring analysis is not collected, intelligence fails. Executing collection management under the traditional tasking process
Integrating a Genetic Algorithm Into a Knowledge-Based System for Ordering Complex Design Processes
NASA Technical Reports Server (NTRS)
Rogers, James L.; McCulley, Collin M.; Bloebaum, Christina L.
1996-01-01
The design cycle associated with large engineering systems requires an initial decomposition of the complex system into design processes which are coupled through the transference of output data. Some of these design processes may be grouped into iterative subcycles. In analyzing or optimizing such a coupled system, it is essential to be able to determine the best ordering of the processes within these subcycles to reduce design cycle time and cost. Many decomposition approaches assume the capability is available to determine what design processes and couplings exist and what order of execution will be imposed during the design cycle. Unfortunately, this is often a complex problem and beyond the capabilities of a human design manager. A new feature, a genetic algorithm, has been added to DeMAID (Design Manager's Aid for Intelligent Decomposition) to allow the design manager to rapidly examine many different combinations of ordering processes in an iterative subcycle and to optimize the ordering based on cost, time, and iteration requirements. Two sample test cases are presented to show the effects of optimizing the ordering with a genetic algorithm.
Hunter, Adam; Dayalan, Saravanan; De Souza, David; Power, Brad; Lorrimar, Rodney; Szabo, Tamas; Nguyen, Thu; O'Callaghan, Sean; Hack, Jeremy; Pyke, James; Nahid, Amsha; Barrero, Roberto; Roessner, Ute; Likic, Vladimir; Tull, Dedreia; Bacic, Antony; McConville, Malcolm; Bellgard, Matthew
2017-01-01
An increasing number of research laboratories and core analytical facilities around the world are developing high throughput metabolomic analytical and data processing pipelines that are capable of handling hundreds to thousands of individual samples per year, often over multiple projects, collaborations and sample types. At present, there are no Laboratory Information Management Systems (LIMS) that are specifically tailored for metabolomics laboratories that are capable of tracking samples and associated metadata from the beginning to the end of an experiment, including data processing and archiving, and which are also suitable for use in large institutional core facilities or multi-laboratory consortia as well as single laboratory environments. Here we present MASTR-MS, a downloadable and installable LIMS solution that can be deployed either within a single laboratory or used to link workflows across a multisite network. It comprises a Node Management System that can be used to link and manage projects across one or multiple collaborating laboratories; a User Management System which defines different user groups and privileges of users; a Quote Management System where client quotes are managed; a Project Management System in which metadata is stored and all aspects of project management, including experimental setup, sample tracking and instrument analysis, are defined, and a Data Management System that allows the automatic capture and storage of raw and processed data from the analytical instruments to the LIMS. MASTR-MS is a comprehensive LIMS solution specifically designed for metabolomics. It captures the entire lifecycle of a sample starting from project and experiment design to sample analysis, data capture and storage. It acts as an electronic notebook, facilitating project management within a single laboratory or a multi-node collaborative environment. This software is being developed in close consultation with members of the metabolomics research community. It is freely available under the GNU GPL v3 licence and can be accessed from, https://muccg.github.io/mastr-ms/.
Design of a Model-Based Online Management Information System for Interlibrary Loan Networks.
ERIC Educational Resources Information Center
Rouse, Sandra H.; Rouse, William B.
1979-01-01
Discusses the design of a model-based management information system in terms of mathematical/statistical, information processing, and human factors issues and presents a prototype system for interlibrary loan networks. (Author/CWM)
Park, Yu Rang; Yoon, Young Jo; Koo, HaYeong; Yoo, Soyoung; Choi, Chang-Min; Beck, Sung-Ho; Kim, Tae Won
2018-04-24
Clinical trials pose potential risks in both communications and management due to the various stakeholders involved when performing clinical trials. The academic medical center has a responsibility and obligation to conduct and manage clinical trials while maintaining a sufficiently high level of quality, therefore it is necessary to build an information technology system to support standardized clinical trial processes and comply with relevant regulations. The objective of the study was to address the challenges identified while performing clinical trials at an academic medical center, Asan Medical Center (AMC) in Korea, by developing and utilizing a clinical trial management system (CTMS) that complies with standardized processes from multiple departments or units, controlled vocabularies, security, and privacy regulations. This study describes the methods, considerations, and recommendations for the development and utilization of the CTMS as a consolidated research database in an academic medical center. A task force was formed to define and standardize the clinical trial performance process at the site level. On the basis of the agreed standardized process, the CTMS was designed and developed as an all-in-one system complying with privacy and security regulations. In this study, the processes and standard mapped vocabularies of a clinical trial were established at the academic medical center. On the basis of these processes and vocabularies, a CTMS was built which interfaces with the existing trial systems such as the electronic institutional review board health information system, enterprise resource planning, and the barcode system. To protect patient data, the CTMS implements data governance and access rules, and excludes 21 personal health identifiers according to the Health Insurance Portability and Accountability Act (HIPAA) privacy rule and Korean privacy laws. Since December 2014, the CTMS has been successfully implemented and used by 881 internal and external users for managing 11,645 studies and 146,943 subjects. The CTMS was introduced in the Asan Medical Center to manage the large amounts of data involved with clinical trial operations. Inter- and intraunit control of data and resources can be easily conducted through the CTMS system. To our knowledge, this is the first CTMS developed in-house at an academic medical center side which can enhance the efficiency of clinical trial management in compliance with privacy and security laws. ©Yu Rang Park, Young Jo Yoon, HaYeong Koo, Soyoung Yoo, Chang-Min Choi, Sung-Ho Beck, Tae Won Kim. Originally published in the Journal of Medical Internet Research (http://www.jmir.org), 24.04.2018.
FLBEIA : A simulation model to conduct Bio-Economic evaluation of fisheries management strategies
NASA Astrophysics Data System (ADS)
Garcia, Dorleta; Sánchez, Sonia; Prellezo, Raúl; Urtizberea, Agurtzane; Andrés, Marga
Fishery systems are complex systems that need to be managed in order to ensure a sustainable and efficient exploitation of marine resources. Traditionally, fisheries management has relied on biological models. However, in recent years the focus on mathematical models which incorporate economic and social aspects has increased. Here, we present FLBEIA, a flexible software to conduct bio-economic evaluation of fisheries management strategies. The model is multi-stock, multi-fleet, stochastic and seasonal. The fishery system is described as a sum of processes, which are internally assembled in a predetermined way. There are several functions available to describe the dynamic of each process and new functions can be added to satisfy specific requirements.
Overview of the Smart Network Element Architecture and Recent Innovations
NASA Technical Reports Server (NTRS)
Perotti, Jose M.; Mata, Carlos T.; Oostdyk, Rebecca L.
2008-01-01
In industrial environments, system operators rely on the availability and accuracy of sensors to monitor processes and detect failures of components and/or processes. The sensors must be networked in such a way that their data is reported to a central human interface, where operators are tasked with making real-time decisions based on the state of the sensors and the components that are being monitored. Incorporating health management functions at this central location aids the operator by automating the decision-making process to suggest, and sometimes perform, the action required by current operating conditions. Integrated Systems Health Management (ISHM) aims to incorporate data from many sources, including real-time and historical data and user input, and extract information and knowledge from that data to diagnose failures and predict future failures of the system. By distributing health management processing to lower levels of the architecture, there is less bandwidth required for ISHM, enhanced data fusion, make systems and processes more robust, and improved resolution for the detection and isolation of failures in a system, subsystem, component, or process. The Smart Network Element (SNE) has been developed at NASA Kennedy Space Center to perform intelligent functions at sensors and actuators' level in support of ISHM.
42 CFR 456.725 - Funding of ECM system.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Claims Management System for Outpatient Drug Claims § 456.725 Funding of ECM system. (a) For funds..., and implementation of an on-line, real-time claims management system (that is, the most cost-effective... process that is integrated into a single comprehensive utilization and information reporting system. ...
76 FR 72691 - Privacy Act of 1974; System of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-25
... into the DLA accounting and financial management process. Records are used by the DOD Components who...: Financial Compliance and Process Management (J-89), Headquarters, Defense Logistics Agency, 8725 John J... DoD Components who receive accounting and financial management support from DLA under an...
College and University Systems Environment: University of Hawaii.
ERIC Educational Resources Information Center
CAUSE/EFFECT, 1983
1983-01-01
The management systems office at the University of Hawaii assists in the development and operation of an effective management information systems service. A shared computer system approach was developed to provide service in the areas of office automation and data processing. (MLW)
Study on parallel and distributed management of RS data based on spatial database
NASA Astrophysics Data System (ADS)
Chen, Yingbiao; Qian, Qinglan; Wu, Hongqiao; Liu, Shijin
2009-10-01
With the rapid development of current earth-observing technology, RS image data storage, management and information publication become a bottle-neck for its appliance and popularization. There are two prominent problems in RS image data storage and management system. First, background server hardly handle the heavy process of great capacity of RS data which stored at different nodes in a distributing environment. A tough burden has put on the background server. Second, there is no unique, standard and rational organization of Multi-sensor RS data for its storage and management. And lots of information is lost or not included at storage. Faced at the above two problems, the paper has put forward a framework for RS image data parallel and distributed management and storage system. This system aims at RS data information system based on parallel background server and a distributed data management system. Aiming at the above two goals, this paper has studied the following key techniques and elicited some revelatory conclusions. The paper has put forward a solid index of "Pyramid, Block, Layer, Epoch" according to the properties of RS image data. With the solid index mechanism, a rational organization for different resolution, different area, different band and different period of Multi-sensor RS image data is completed. In data storage, RS data is not divided into binary large objects to be stored at current relational database system, while it is reconstructed through the above solid index mechanism. A logical image database for the RS image data file is constructed. In system architecture, this paper has set up a framework based on a parallel server of several common computers. Under the framework, the background process is divided into two parts, the common WEB process and parallel process.
Study on parallel and distributed management of RS data based on spatial data base
NASA Astrophysics Data System (ADS)
Chen, Yingbiao; Qian, Qinglan; Liu, Shijin
2006-12-01
With the rapid development of current earth-observing technology, RS image data storage, management and information publication become a bottle-neck for its appliance and popularization. There are two prominent problems in RS image data storage and management system. First, background server hardly handle the heavy process of great capacity of RS data which stored at different nodes in a distributing environment. A tough burden has put on the background server. Second, there is no unique, standard and rational organization of Multi-sensor RS data for its storage and management. And lots of information is lost or not included at storage. Faced at the above two problems, the paper has put forward a framework for RS image data parallel and distributed management and storage system. This system aims at RS data information system based on parallel background server and a distributed data management system. Aiming at the above two goals, this paper has studied the following key techniques and elicited some revelatory conclusions. The paper has put forward a solid index of "Pyramid, Block, Layer, Epoch" according to the properties of RS image data. With the solid index mechanism, a rational organization for different resolution, different area, different band and different period of Multi-sensor RS image data is completed. In data storage, RS data is not divided into binary large objects to be stored at current relational database system, while it is reconstructed through the above solid index mechanism. A logical image database for the RS image data file is constructed. In system architecture, this paper has set up a framework based on a parallel server of several common computers. Under the framework, the background process is divided into two parts, the common WEB process and parallel process.
A Process-Based Knowledge Management System for Schools: A Case Study in Taiwan
ERIC Educational Resources Information Center
Lee, Chi-Lung; Lu, Hsi-Peng; Yang, Chyan; Hou, Huei-Tse
2010-01-01
Knowledge management systems, or KMSs, have been widely adopted in business organizations, yet little research exists on the actual integration of the knowledge management model and the application of KMSs in secondary schools. In the present study, the common difficulties and limitations regarding the implementation of knowledge management into…
1983-04-01
Management Information System (OHMIS). The system design includes: detailed function data flows for each of the core data processing functions of OHMIS, in the form of input/processing/output algorithms; detailed descriptions of the inputs and outputs; performance specifications of OHMIS; resources required to develop and operate OHMIS (Vol II). In addition, the report provides a summary of the rationale used to develop the recommended system design, a description of the methodology used to develop the recommended system design, and a review of existing
ERIC Educational Resources Information Center
Needham, Robbie Lee
1993-01-01
Presents the quality-focused management (QFM) system and explains the departure QFM makes from established community college management practices. Describes the system's self-directed teams engaged in a continuous improvement process driven by customer demand and long-term commitment to quality and cost control. (13 references.) (MAB)
Workflow Automation: A Collective Case Study
ERIC Educational Resources Information Center
Harlan, Jennifer
2013-01-01
Knowledge management has proven to be a sustainable competitive advantage for many organizations. Knowledge management systems are abundant, with multiple functionalities. The literature reinforces the use of workflow automation with knowledge management systems to benefit organizations; however, it was not known if process automation yielded…
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2014 CFR
2014-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2012 CFR
2012-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2013 CFR
2013-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2011 CFR
2011-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
DOT National Transportation Integrated Search
2009-04-01
This project evaluates the process that was followed by MDOT and other stakeholders for the acquisition : of new Advanced Traffic Management System (ATMS) software aiming to integrate and facilitate the : management of various Intelligent Transportat...
NASA Technical Reports Server (NTRS)
Lohr, Gary W.; Williams, Daniel M.
2008-01-01
Significant air traffic increases are anticipated for the future of the National Airspace System (NAS). To cope with future traffic increases, fundamental changes are required in many aspects of the air traffic management process including the planning and use of NAS resources. Two critical elements of this process are the selection of airport runway configurations, and the effective management of active runways. Two specific research areas in NASA's Airspace Systems Program (ASP) have been identified to address efficient runway management: Runway Configuration Management (RCM) and Arrival/Departure Runway Balancing (ADRB). This report documents efforts in assessing past as well as current work in these two areas.
Kunkel, S; Rosenqvist, U; Westerling, R
2009-02-01
To analyse whether the organisation of quality systems (structure, process, and outcome) is related to how these systems were implemented (implementation prerequisites, cooperation between managers and staff, and source of initiative). A questionnaire was developed, piloted and distributed to 600 hospital departments. Questions were included to reflect implementation prerequisites (adequate resources, competence, problem-solving capacity and high expectations), cooperative implementation, source of initiative (manager, staff and purchaser), structure (resources and administration), process (culture and cooperation) and outcome (goal evaluation and competence development). The adjusted response rate was 75%. Construct validity and reliability was assessed by confirmatory factor analysis, and Cronbach alpha scores were calculated. The relationships among the variables were analysed with structural equation modelling with LISREL. Implementation prerequisites were highly related to structure (0.51) and process (0.33). Cooperative implementation was associated with process (0.26) and outcome (0.34). High manager initiative was related to structure (0.19) and process (0.17). The numbers in parentheses can be interpreted as correlations. Construct validity was good, and reliability was excellent for all factors (Cronbach alpha>0.78). The model was a good representation of reality (model fit p value = 0.082). The implementation of organisationally demanding quality systems may require managers to direct and lead the process while assuring that their staff get opportunities to contribute to the planning and designing of the new system. This would correspond to a cooperative implementation strategy rather than to top-down or bottom-up strategies. The results of this study could be used to adjust implementation processes.
Discussion of the enabling environments for decentralised water systems.
Moglia, M; Alexander, K S; Sharma, A
2011-01-01
Decentralised water supply systems are becoming increasingly affordable and commonplace in Australia and have the potential to alleviate urban water shortages and reduce pollution into natural receiving marine and freshwater streams. Learning processes are necessary to support the efficient implementation of decentralised systems. These processes reveal the complex socio-technical and institutional factors to be considered when developing an enabling environment supporting decentralised water and wastewater servicing solutions. Critical to the technological transition towards established decentralised systems is the ability to create strategic and adaptive capacity to promote learning and dialogue. Learning processes require institutional mechanisms to ensure the lessons are incorporated into the formulation of policy and regulation, through constructive involvement of key government institutions. Engagement of stakeholders is essential to the enabling environment. Collaborative learning environments using systems analysis with communities (social learning) and adaptive management techniques are useful in refining and applying scientists' and managers' knowledge (knowledge management).
1986-08-01
Architect, troi systems, CAD CAM, and com- functional analysis , synthesis, and National Bureau of Standards, mon engineering data bases will be the trade...Recurrent analysis of a management these s h e m evolutionary chain of data processing problem combining real data and ponents of defense support system...at the Defense first constructed his support simulator Systems Management College, the by assembling appropriate analysis Data Storage and Retrieval
Development of a Logistics Support Framework for Defense Mapping Agency (DMA) Automated Systems
1990-09-01
cycle of a particular system. This research identified principles of management , design or system life cycle processes, and ILS elements needed to...Delphi results gathered from DMA expert opinions. The principles of management , depicted in the Logistics Systems Management Matrix (LSMM) portrayed...review were used to form the Delphi survey questions in Chapter III. As shown in Figure 2, the LSMM is a three-dimensional model with thp principles of management on
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies themore » close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.« less
Sampalli, Tara; Christian, Erin; Edwards, Lynn; Ryer, Ashley
2015-01-01
Improving care for chronic conditions requires system-level transformations to ensure multiple levels of adoption and sustainability of the implemented improvements. These comprehensive solutions require transformations and supports at various levels, leadership and process changes at service/program level. Recognizing the importance of an organization-wide strategy to mitigate the growing issue of chronic disease prevention and management, a novel system-level approach has been developed in a district health authority in Nova Scotia, Canada. In this paper, the contextual factors and efforts that led to the conceptual framework of the Chronic Disease Prevention and Management (CDPM) "Corridor©" to management of chronic conditions are discussed. The CDPM Corridor© essentially constitutes a system-level redesign process; common elements, tools and resources; and a hub of supports for chronic disease prevention and management. The CDPM Corridor © will include a toolkit to guide the implementation of the proposed transformations.
The Design of a Practical Enterprise Safety Management System
NASA Astrophysics Data System (ADS)
Gabbar, Hossam A.; Suzuki, Kazuhiko
This book presents design guidelines and implementation approaches for enterprise safety management system as integrated within enterprise integrated systems. It shows new model-based safety management where process design automation is integrated with enterprise business functions and components. It proposes new system engineering approach addressed to new generation chemical industry. It will help both the undergraduate and professional readers to build basic knowledge about issues and problems of designing practical enterprise safety management system, while presenting in clear way, the system and information engineering practices to design enterprise integrated solution.
Tot, Bojana; Srđević, Bojan; Vujić, Bogdana; Russo, Mário Augusto Tavares; Vujić, Goran
2016-08-01
The problems of waste management have become increasingly complex in recent decades. The increasing amount of generated waste, adopted legislation in the field of waste management, administrative issues, economic impacts and social awareness are important drivers in achieving a sustainable waste management system. However, in practice, there are many other drivers that are often mutually in conflict. The purpose of this research is to define the precise driver and their corresponding sub-drivers, which are relevant for developing a waste management system and, on the basis of their importance, to determine which has the predominant influence on the slow development of a waste management system at the national and regional level, within the Republic of Serbia and similar countries of southeast Europe. This research presents two levels of decision making: the first is a pair-wise comparison of the drivers in relation to the goal and the second is a pair-wise comparison of the sub-drivers in relation to the driver and in relation to the goal. Results of performed analyses on the waste management drivers were integrated via the decision-making process supported by an analytic hierarchy process (AHP). The final results of this research shows that the Institutional-Administrative driver is the most important for developing a sustainable waste management system. © The Author(s) 2016.
Project management techniques for highly integrated programs
NASA Technical Reports Server (NTRS)
Stewart, J. F.; Bauer, C. A.
1983-01-01
The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Katipamula, Srinivas; Gowri, Krishnan; Hernandez, George
This paper describes one such reference process that can be deployed to provide continuous automated conditioned-based maintenance management for buildings that have BIM, a building automation system (BAS) and a computerized maintenance management software (CMMS) systems. The process can be deployed using an open source transactional network platform, VOLTTRON™, designed for distributed sensing and controls and supports both energy efficiency and grid services.
Spolaore, P; Murolo, G; Sommavilla, M
2003-01-01
Recent health care reforms, the start of accreditation processes of health institutions, and the introduction also in the health system of risk management concepts and instruments, borrowed from the enterprise culture and the emphasis put on the protection of privacy, render evident the need and the urgency to define and to implement improvement processes of the organization and management of the medical documentation in the hospital with the aim of facilitation in fulfilment of regional and local health authorities policies about protection of the safety and improvement of quality of care. Currently the normative context that disciplines the management of medical records inside the hospital appears somewhat fragmentary, incomplete and however not able to clearly orientate health operators with the aim of a correct application of the enforced norms in the respect of the interests of the user and of local health authority. In this job we individuate the critical steps in the various phases of management process of the clinical folder and propose a new model of regulations, with the purpose to improve and to simplify the management processes and the modalities of compilation, conservation and release to entitled people of all clinical documentation.
Salinas La Casta, Maria; Flores Pardo, Emilio; Uris Selles, Joaquín
2009-01-01
to propose a set of indicators as a management tool for a clinical laboratory, by using the balanced scorecard internal business processes perspective. indicators proposed are obtained from different sources; external proficiency testing of the Valencia Community Government, by means of internal surveys and laboratory information system registers. One year testing process proportion indicators results are showed. internal management indicators are proposed (process, appropriateness and proficiency testing). The process indicators results show gradual improvement since its establishment. after one years of using a conceptually solid Balanced Scorecard Internal business processes perspective indicators, the obtained results validate the usefulness as a laboratory management tool.
Rodriguez, Salvador; Aziz, Ayesha; Chatwin, Chris
2014-01-01
The use of Health Information Technology (HIT) to improve healthcare service delivery is constantly increasing due to research advances in medical science and information systems. Having a fully automated process solution for a Healthcare Organization (HCO) requires a combination of organizational strategies along with a selection of technologies that facilitate the goal of improving clinical outcomes. HCOs, requires dynamic management of care capability to realize the full potential of HIT. Business Process Management (BPM) is being increasingly adopted to streamline the healthcare service delivery and management processes. Emergency Departments (EDs) provide a case in point, which require multidisciplinary resources and services to deliver effective clinical outcomes. Managed care involves the coordination of a range of services in an ED. Although fully automated processes in emergency care provide a cutting edge example of service delivery, there are many situations that require human interactions with the computerized systems; e.g. Medication Approvals, care transfer, acute patient care. This requires a coordination mechanism for all the resources, computer and human, to work side by side to provide the best care. To ensure evidence-based medical practice in ED, we have designed a Human Task Management service to model the process of coordination of ED resources based on the UK's NICE Clinical guideline for managing the care of acutely ill patients. This functionality is implemented using Java Business process Management (jBPM).
1982-12-01
Data Base Management System Aboard U.S. Naval Ships Under the Shipboard Non-tactical ADP Program by Robert Harrison Dixon December 1982 Thesis Advisor...OF REPORT a PERIOD COVIAOtt Management Principles to be Considered for Master’s Thesis Implementing a Data Base Management System December 1982 Aboard...NOTES is. KEY s0mas (Coelte on revrs side of 0..e..mp am iNe or "Neo 00111) Data Base Management System , DBMS, SNAP, SNAP I, SNAP II, Information
Managing Space System Faults: Coalescing NASA's Views
NASA Technical Reports Server (NTRS)
Muirhead, Brian; Fesq, Lorraine
2012-01-01
Managing faults and their resultant failures is a fundamental and critical part of developing and operating aerospace systems. Yet, recent studies have shown that the engineering "discipline" required to manage faults is not widely recognized nor evenly practiced within the NASA community. Attempts to simply name this discipline in recent years has been fraught with controversy among members of the Integrated Systems Health Management (ISHM), Fault Management (FM), Fault Protection (FP), Hazard Analysis (HA), and Aborts communities. Approaches to managing space system faults typically are unique to each organization, with little commonality in the architectures, processes and practices across the industry.
NASA Automatic Information Security Handbook
NASA Technical Reports Server (NTRS)
1993-01-01
This handbook details the Automated Information Security (AIS) management process for NASA. Automated information system security is becoming an increasingly important issue for all NASA managers and with rapid advancements in computer and network technologies and the demanding nature of space exploration and space research have made NASA increasingly dependent on automated systems to store, process, and transmit vast amounts of mission support information, hence the need for AIS systems and management. This handbook provides the consistent policies, procedures, and guidance to assure that an aggressive and effective AIS programs is developed, implemented, and sustained at all NASA organizations and NASA support contractors.
[Computers in nursing: development of free software application with care and management].
dos Santos, Sérgio Ribeiro
2010-06-01
This study aimed at developing an information system in nursing with the implementation of nursing care and management of the service. The SisEnf--Information System in Nursing--is a free software module that comprises the care of nursing: history, clinical examination and care plan; the management module consists of: service shifts, personnel management, hospital indicators and other elements. The system was implemented at the Medical Clinic of the Lauro Wanderley University Hospital, at Universidade Federal da Paraiba. In view of the need to bring user and developer closer, in addition to the constant change of functional requirements during the interactive process, the method of unified process was used. The SisEnf was developed on a WEB platform and using free software. Hence, the work developed aimed at assisting in the working process of nursing, which will now have the opportunity to incorporate information technology in their work routine.
Design of a Recommendation System for Adding Support in the Treatment of Chronic Patients.
Torkar, Simon; Benedik, Peter; Rajkovič, Uroš; Šušteršič, Olga; Rajkovič, Vladislav
2016-01-01
Rapid growth of chronic disease cases around the world is adding pressure on healthcare providers to ensure a structured patent follow-up during chronic disease management process. In response to the increasing demand for better chronic disease management and improved health care efficiency, nursing roles have been specialized or enhanced in the primary health care setting. Nurses become key players in chronic disease management process. Study describes a system to help nurses manage the care process of patient with chronic disease. It supports focusing nurse's attention on those resources/solutions that are likely to be most relevant to their particular situation/problem in nursing domain. System is based on multi-relational property graph representing a flexible modeling construct. Graph allows modeling a nursing ontology and the indices that partition domain into an efficient, searchable space where the solution to a problem is seen as abstractly defined traversals through its vertices and edges.
Research on Design Information Management System for Leather Goods
NASA Astrophysics Data System (ADS)
Lu, Lei; Peng, Wen-li
The idea of setting up a design information management system of leather goods was put forward to solve the problems existed in current information management of leather goods. Working principles of the design information management system for leather goods were analyzed in detail. Firstly, the acquiring approach of design information of leather goods was introduced. Secondly, the processing methods of design information were introduced. Thirdly, the management of design information in database was studied. Finally, the application of the system was discussed by taking the shoes products as an example.
ERIC Educational Resources Information Center
Coopers & Lybrand, New York, NY.
Covered in this report of the 1978 project of the Joint Committee on Printing are aspects of three selected areas. Part one, Management Review and Assessment, contains a summary of management and user interviews, a review of GPO's goals and organizational structure, and an assessment of management systems and procedures. The accounting system is…
Application of a geomorphic and temporal perspective to wetland management in North America
Smith, L.M.; Euliss, N.H.; Wilcox, D.A.; Brinson, M.M.
2008-01-01
The failure of managed wetlands to provide a broad suite of ecosystem services (e.g., carbon storage, wildlife habitat, ground-water recharge, storm-water retention) valuable to society is primarily the result of a lack of consideration of ecosystem processes that maintain productive wetland ecosystems or physical and social forces that restrict a manager's ability to apply actions that allow those processes to occur. Therefore, we outline a course of action that considers restoration of ecosystem processes in those systems where off-site land use or physical alterations restrict local management. Upon considering a wetland system, or examining a particular management regime, there are several factors that will allow successful restoration of wetland services. An initial step is examination of the political/social factors that have structured the current ecological condition and whether those realities can be addressed. Most successful restorations of wetland ecosystem services involve cooperation among multiple agencies, acquisition of funds from non-traditional sources, seeking of scientific advice on ecosystem processes, and cultivation of good working relationships among biologists, managers, and maintenance staff. Beyond that, in on-site wetland situations, management should examine the existing hydrogeomorphic situation and processes (e.g., climatic variation, tides, riverine flood-pulse events) responsible for maintenance of ecosystem services within a given temporal framework appropriate for that wetland's hydrologic pattern. We discuss these processes for five major wetland types (depressional, lacustrine, estuarine, riverine, and man-made impoundments) and then provide two case histories in which this approach was applied: Seney National Wildlife Refuge with a restored fen system and Bosque del Apache National Wildlife Refuge where riverine processes have been simulated to restore native habitat. With adequate partnerships and administrative and political support, managers faced with degraded and/or disconnected wetland processes will be able to restore ecosystem services for society in our highly altered landscape by considering wetlands in their given hydrogeomorphic setting and temporal stage. ?? 2008 The Society of Wetland Scientists.
Salary Management System for Small and Medium-sized Enterprises
NASA Astrophysics Data System (ADS)
Hao, Zhang; Guangli, Xu; Yuhuan, Zhang; Yilong, Lei
Small and Medium-sized Enterprises (SMEs) in the process of wage entry, calculation, the total number are needed to be done manually in the past, the data volume is quite large, processing speed is low, and it is easy to make error, which is resulting in low efficiency. The main purpose of writing this paper is to present the basis of salary management system, establish a scientific database, the computer payroll system, using the computer instead of a lot of past manual work in order to reduce duplication of staff labor, it will improve working efficiency.This system combines the actual needs of SMEs, through in-depth study and practice of the C/S mode, PowerBuilder10.0 development tools, databases and SQL language, Completed a payroll system needs analysis, database design, application design and development work. Wages, departments, units and personnel database file are included in this system, and have data management, department management, personnel management and other functions, through the control and management of the database query, add, delete, modify, and other functions can be realized. This system is reasonable design, a more complete function, stable operation has been tested to meet the basic needs of the work.
23 CFR 972.204 - Management systems requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS HIGHWAYS FISH AND... to operate and maintain the management systems and their associated databases; and (5) A process for... systems will use databases with a geographical reference system that can be used to geolocate all database...
NASA Technical Reports Server (NTRS)
Mulqueen, John; Maples, C. Dauphne; Fabisinski, Leo, III
2012-01-01
This paper provides an overview of Systems Engineering as it is applied in a conceptual design space systems department at the National Aeronautics and Space Administration (NASA) Marshall Spaceflight Center (MSFC) Advanced Concepts Office (ACO). Engineering work performed in the NASA MFSC's ACO is targeted toward the Exploratory Research and Concepts Development life cycle stages, as defined in the International Council on Systems Engineering (INCOSE) System Engineering Handbook. This paper addresses three ACO Systems Engineering tools that correspond to three INCOSE Technical Processes: Stakeholder Requirements Definition, Requirements Analysis, and Integration, as well as one Project Process Risk Management. These processes are used to facilitate, streamline, and manage systems engineering processes tailored for the earliest two life cycle stages, which is the environment in which ACO engineers work. The role of systems engineers and systems engineering as performed in ACO is explored in this paper. The need for tailoring Systems Engineering processes, tools, and products in the ever-changing engineering services ACO provides to its customers is addressed.
Individualizing the Teaching of Reading through Test Management Systems.
ERIC Educational Resources Information Center
Fry, Edward
Test management systems are suggested for individualizing the teaching of reading in the elementary classroom. Test management systems start with a list of objectives or specific goals which cover all or some major areas of the learning to read process. They then develop a large number of criterion referenced tests which match the skill areas at…
5 CFR 9901.223 - Appeal to DoD for review of classification decisions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM (NSPS) Classification Classification Process § 9901... an appeal. A management official may disallow an employee's representative when— (1) An individual's...
Internet-based Interactive Construction Management Learning System.
ERIC Educational Resources Information Center
Sawhney, Anil; Mund, Andre; Koczenasz, Jeremy
2001-01-01
Describes a way to incorporate practical content into the construction engineering and management curricula: the Internet-based Interactive Construction Management Learning System, which uses interactive and adaptive learning environments to train students in the areas of construction methods, equipment and processes using multimedia, databases,…
Managing Automation: A Process, Not a Project.
ERIC Educational Resources Information Center
Hoffmann, Ellen
1988-01-01
Discussion of issues in management of library automation includes: (1) hardware, including systems growth and contracts; (2) software changes, vendor relations, local systems, and microcomputer software; (3) item and authority databases; (4) automation and library staff, organizational structure, and managing change; and (5) environmental issues,…
Computer Sciences and Data Systems, volume 1
NASA Technical Reports Server (NTRS)
1987-01-01
Topics addressed include: software engineering; university grants; institutes; concurrent processing; sparse distributed memory; distributed operating systems; intelligent data management processes; expert system for image analysis; fault tolerant software; and architecture research.
42 CFR 431.806 - State plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... processing assessment system. Except in a State that has an approved Medicaid Management Information System... Medicaid quality control claims processing assessment system that meets the requirements of §§ 431.830...
NASA Astrophysics Data System (ADS)
Yang, Chunhui; Su, Zhixiong; Wang, Xin; Liu, Yang; Qi, Yongwei
2017-03-01
The new normalization of the economic situation and the implementation of a new round of electric power system reform put forward higher requirements to the daily operation of power grid companies. As an important day-to-day operation of power grid companies, investment management is directly related to the promotion of the company's operating efficiency and management level. In this context, the establishment of power grid company investment management optimization system will help to improve the level of investment management and control the company, which is of great significance for power gird companies to adapt to market environment changing as soon as possible and meet the policy environment requirements. Therefore, the purpose of this paper is to construct the investment management optimization system of power grid companies, which includes investment management system, investment process control system, investment structure optimization system, and investment project evaluation system and investment management information platform support system.
Deep Space Network equipment performance, reliability, and operations management information system
NASA Technical Reports Server (NTRS)
Cooper, T.; Lin, J.; Chatillon, M.
2002-01-01
The Deep Space Mission System (DSMS) Operations Program Office and the DeepSpace Network (DSN) facilities utilize the Discrepancy Reporting Management System (DRMS) to collect, process, communicate and manage data discrepancies, equipment resets, physical equipment status, and to maintain an internal Station Log. A collaborative effort development between JPL and the Canberra Deep Space Communication Complex delivered a system to support DSN Operations.
1992-12-01
rights or on management issues such as personnel and infrastructure investments are addresseud in the directive only at the broadest level, or in many...area with investments , including information systems. c. Functional processes improvements shall be accomplished though activity modeling and busi ass...an enterprise has invested considerable time, money and effort into the current system and has limited funds to upgrade the system (111:37). Software
Improving processes through evolutionary optimization.
Clancy, Thomas R
2011-09-01
As systems evolve over time, their natural tendency is to become increasingly more complex. Studies on complex systems have generated new perspectives on management in social organizations such as hospitals. Much of this research appears as a natural extension of the cross-disciplinary field of systems theory. This is the 18th in a series of articles applying complex systems science to the traditional management concepts of planning, organizing, directing, coordinating, and controlling. In this article, I discuss methods to optimize complex healthcare processes through learning, adaptation, and evolutionary planning.
41 CFR 102-192.50 - What payment processes are we required to use?
Code of Federal Regulations, 2010 CFR
2010-07-01
... and Collection Payment (IPAC) process associated with the Official Mail Accounting System (OMAS... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What payment processes... 192-MAIL MANAGEMENT Financial Requirements for All Agencies § 102-192.50 What payment processes are we...
Assessment of Army Contracting Command’s Contract Management Processes (TACOM and RDECOM)
2011-04-01
Management Processes (TACOM and RDECOM)” was prepared for and funded by the Acquisition Program, Graduate School of Business & Public Policy, Naval...system and the Evolved Expendable Launch Vehicle rocket program. Rendon has taught contract management courses for the UCLA Government Contracts...program; he was also a senior faculty member for the Keller Graduate School of Management, where he taught MBA courses in project management and
[Business organization theory: its potential use in the organization of the operating room].
Bartz, H-J
2005-07-01
The paradigm of patient care in the German health system is changing. The introduction of German Diagnosis Related Groups (G-DRGs), a diagnosis-related coding system, has made process-oriented thinking increasingly important. The treatment process is viewed and managed as a whole from the admission to the discharge of the patient. The interfaces of departments and sectors are diminished. A main objective of these measures is to render patient care more cost efficient. Within the hospital, the operating room (OR) is the most expensive factor accounting for 25 - 50 % of the costs of a surgical patient and is also a bottleneck in the surgical patient care. Therefore, controlling of the perioperative treatment process is getting more and more important. Here, the business organisation theory can be a very useful tool. Especially the concepts of process organisation and process management can be applied to hospitals. Process-oriented thinking uncovers and solves typical organisational problems. Competences, responsibilities and tasks are reorganised by process orientation and the enterprise is gradually transformed to a process-oriented system. Process management includes objective-oriented controlling of the value chain of an enterprise with regard to quality, time, costs and customer satisfaction. The quality of the process is continuously improved using process-management techniques. The main advantage of process management is consistent customer orientation. Customer orientation means to be aware of the customer's needs at any time during the daily routine. The performance is therefore always directed towards current market requirements. This paper presents the basics of business organisation theory and to point out its potential use in the organisation of the OR.
Helsens, Kenny; Colaert, Niklaas; Barsnes, Harald; Muth, Thilo; Flikka, Kristian; Staes, An; Timmerman, Evy; Wortelkamp, Steffi; Sickmann, Albert; Vandekerckhove, Joël; Gevaert, Kris; Martens, Lennart
2010-03-01
MS-based proteomics produces large amounts of mass spectra that require processing, identification and possibly quantification before interpretation can be undertaken. High-throughput studies require automation of these various steps, and management of the data in association with the results obtained. We here present ms_lims (http://genesis.UGent.be/ms_lims), a freely available, open-source system based on a central database to automate data management and processing in MS-driven proteomics analyses.
Marshall Space Flight Center Ground Systems Development and Integration
NASA Technical Reports Server (NTRS)
Wade, Gina
2016-01-01
Ground Systems Development and Integration performs a variety of tasks in support of the Mission Operations Laboratory (MOL) and other Center and Agency projects. These tasks include various systems engineering processes such as performing system requirements development, system architecture design, integration, verification and validation, software development, and sustaining engineering of mission operations systems that has evolved the Huntsville Operations Support Center (HOSC) into a leader in remote operations for current and future NASA space projects. The group is also responsible for developing and managing telemetry and command configuration and calibration databases. Personnel are responsible for maintaining and enhancing their disciplinary skills in the areas of project management, software engineering, software development, software process improvement, telecommunications, networking, and systems management. Domain expertise in the ground systems area is also maintained and includes detailed proficiency in the areas of real-time telemetry systems, command systems, voice, video, data networks, and mission planning systems.
Software control and system configuration management: A systems-wide approach
NASA Technical Reports Server (NTRS)
Petersen, K. L.; Flores, C., Jr.
1984-01-01
A comprehensive software control and system configuration management process for flight-crucial digital control systems of advanced aircraft has been developed and refined to insure efficient flight system development and safe flight operations. Because of the highly complex interactions among the hardware, software, and system elements of state-of-the-art digital flight control system designs, a systems-wide approach to configuration control and management has been used. Specific procedures are implemented to govern discrepancy reporting and reconciliation, software and hardware change control, systems verification and validation testing, and formal documentation requirements. An active and knowledgeable configuration control board reviews and approves all flight system configuration modifications and revalidation tests. This flexible process has proved effective during the development and flight testing of several research aircraft and remotely piloted research vehicles with digital flight control systems that ranged from relatively simple to highly complex, integrated mechanizations.
Applying management information systems to staffing.
Hanson, R L
1982-10-01
A management information system (MIS) is a tool for managing resources effectively. After reviewing some concepts and principles for effective data management, Hanson clearly applies the concepts to nurse staffing systems, which manage human resources. He defines a seven-step process for establishing an MIS, from defining the management objective to implementing the system. Pointing out that an MIS need not be computerized to be effective, Hanson presents a positive perspective and clarifies some often-misconceived notions about management information systems and the paper printouts they generate. In the next issue of JONA, a second article by Hanson will take a more detailed look at the variety, use, and usefulness of staffing statistics available from an MIS for staffing. These articles are based on material in a forthcoming book, Management Systems for Nursing Service Staffing, to be published by Aspen Systems Corporation, Rockville, Maryland.
Matrix management for aerospace 2000
NASA Technical Reports Server (NTRS)
Mccarthy, J. F., Jr.
1980-01-01
The martix management approach to program management is an organized effort for attaining program objectives by defining and structuring all elements so as to form a single system whose parts are united by interaction. The objective of the systems approach is uncompromisingly complete coverage of the program management endeavor. Starting with an analysis of the functions necessary to carry out a given program, a model must be defined; a matrix of responsibility assignment must be prepared; and each operational process must be examined to establish how it is to be carried out and how it relates to all other processes.
Including information technology project management in the nursing informatics curriculum.
Sockolow, Paulina; Bowles, Kathryn H
2008-01-01
Project management is a critical skill for nurse informaticists who are in prominent roles developing and implementing clinical information systems. It should be included in the nursing informatics curriculum, as evidenced by its inclusion in informatics competencies and surveys of important skills for informaticists. The University of Pennsylvania School of Nursing includes project management in two of the four courses in the master's level informatics minor. Course content includes the phases of the project management process; the iterative unified process methodology; and related systems analysis and project management skills. During the introductory course, students learn about the project plan, requirements development, project feasibility, and executive summary documents. In the capstone course, students apply the system development life cycle and project management skills during precepted informatics projects. During this in situ experience, students learn, the preceptors benefit, and the institution better prepares its students for the real world.
5 CFR 9901.224 - Appeal to OPM for review of classification decisions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM (NSPS) Classification Classification Process § 9901...
5 CFR 9901.224 - Appeal to OPM for review of classification decisions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM (NSPS) Classification Classification Process § 9901...
Andújar-Montoya, María Dolores
2017-01-01
The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work environment during the execution of tasks. Therefore, the high percentage of defects detected in buildings that have the root cause in the construction phase could be avoidable with a more accurate and efficient control of the process. The present work proposes a novel integration model based on information and communications technologies for the automation of both construction work and its management at the execution phase, specifically focused on the flat roof construction process. Roofs represent the second area where more defects are claimed. The proposed model is based on a Web system, supported by a service oriented architecture, for the integral management of tasks through the Last Planner System methodology, but incorporating the management of task restrictions from the physical environment variables by designing specific sensing systems. Likewise, all workers are integrated into the management process by Internet-of-Things solutions that guide them throughout the execution process in a non-intrusive and transparent way. PMID:28737693
Andújar-Montoya, María Dolores; Marcos-Jorquera, Diego; García-Botella, Francisco Manuel; Gilart-Iglesias, Virgilio
2017-07-22
The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work environment during the execution of tasks. Therefore, the high percentage of defects detected in buildings that have the root cause in the construction phase could be avoidable with a more accurate and efficient control of the process. The present work proposes a novel integration model based on information and communications technologies for the automation of both construction work and its management at the execution phase, specifically focused on the flat roof construction process. Roofs represent the second area where more defects are claimed. The proposed model is based on a Web system, supported by a service oriented architecture, for the integral management of tasks through the Last Planner System methodology, but incorporating the management of task restrictions from the physical environment variables by designing specific sensing systems. Likewise, all workers are integrated into the management process by Internet-of-Things solutions that guide them throughout the execution process in a non-intrusive and transparent way.
Application of decision science to resilience management in Jamaica Bay
Eaton, Mitchell; Fuller, Angela K.; Johnson, Fred A.; Hare, M. P.; Stedman, Richard C.; Sanderson, E.W.; Solecki, W. D.; Waldman, J.R.; Paris, A. S.
2016-01-01
This book highlights the growing interest in management interventions designed to enhance the resilience of the Jamaica Bay socio-ecological system. Effective management, whether the focus is on managing biological processes or human behavior or (most likely) both, requires decision makers to anticipate how the managed system will respond to interventions (i.e., via predictions or projections). In systems characterized by many interacting components and high uncertainty, making probabilistic predictions is often difficult and requires careful thinking not only about system dynamics, but also about how management objectives are specified and the analytic method used to select the preferred action(s). Developing a clear statement of the problem(s) and articulation of management objectives is often best achieved by including input from managers, scientists and other stakeholders affected by the decision through a process of joint problem framing (Marcot and others 2012; Keeney and others 1990). Using a deliberate, coherent and transparent framework for deciding among management alternatives to best meet these objectives then ensures a greater likelihood for successful intervention. Decision science provides the theoretical and practical basis for developing this framework and applying decision analysis methods for making complex decisions under uncertainty and risk.
The intelligent user interface for NASA's advanced information management systems
NASA Technical Reports Server (NTRS)
Campbell, William J.; Short, Nicholas, Jr.; Rolofs, Larry H.; Wattawa, Scott L.
1987-01-01
NASA has initiated the Intelligent Data Management Project to design and develop advanced information management systems. The project's primary goal is to formulate, design and develop advanced information systems that are capable of supporting the agency's future space research and operational information management needs. The first effort of the project was the development of a prototype Intelligent User Interface to an operational scientific database, using expert systems and natural language processing technologies. An overview of Intelligent User Interface formulation and development is given.
The evolution of educational information systems and nurse faculty roles.
Nelson, Ramona; Meyers, Linda; Rizzolo, Mary Anne; Rutar, Pamela; Proto, Marcia B; Newbold, Susan
2006-01-01
Institutions of higher education are purchasing and/or designing sophisticated administrative information systems to manage such functions as the application, admissions, and registration process, grants management, student records, and classroom scheduling. Although faculty also manage large amounts of data, few automated systems have been created to help faculty improve teaching and learning through the management of information related to individual students, the curriculum, educational programs, and program evaluation. This article highlights the potential benefits that comprehensive educational information systems offer nurse faculty.
NASA Astrophysics Data System (ADS)
Liang, Likai; Bi, Yushen
Considered on the distributed network management system's demand of high distributives, extensibility and reusability, a framework model of Three-tier distributed network management system based on COM/COM+ and DNA is proposed, which adopts software component technology and N-tier application software framework design idea. We also give the concrete design plan of each layer of this model. Finally, we discuss the internal running process of each layer in the distributed network management system's framework model.
NASA Astrophysics Data System (ADS)
Demyanova, O. V.; Andreeva, E. V.; Sibgatullina, D. R.; Kireeva-Karimova, A. M.; Gafurova, A. Y.; Zakirova, Ch S.
2018-05-01
ERP in a modern enterprise information system allowed optimizing internal business processes, reducing production costs and increasing the attractiveness of enterprises for investors. It is an important component of success in the competition and an important condition for attracting investments in the key sector of the state. A vivid example of these systems are enterprise information systems using the methodology of ERP (Enterprise Resource Planning - enterprise resource planning). ERP is an integrated set of methods, processes, technologies and tools. It is based on: supply chain management; advanced planning and scheduling; sales automation; tool responsible for configuring; final resource planning; intelligence business; OLAP technology; block e- Commerce; management of product data. The main purpose of ERP systems is the automation of interrelated processes of planning, accounting and management in key areas of the company. ERP systems are automated systems that effectively address complex problems, including optimal allocation of business resources, ensuring quick and efficient delivery of goods and services to the consumer. Knowledge embedded in ERP systems provided enterprise-wide automation to introduce the activities of all functional departments of the company as a single complex system. At the level of quality estimates, most managers understand that the implementations of ERP systems is a necessary and useful procedure. Assessment of the effectiveness of the information systems implementation is relevant.
NASA Astrophysics Data System (ADS)
Mohammadi, Hadi
Use of the Patch Vulnerability Management (PVM) process should be seriously considered for any networked computing system. The PVM process prevents the operating system (OS) and software applications from being attacked due to security vulnerabilities, which lead to system failures and critical data leakage. The purpose of this research is to create and design a Security and Critical Patch Management Process (SCPMP) framework based on Systems Engineering (SE) principles. This framework will assist Information Technology Department Staff (ITDS) to reduce IT operating time and costs and mitigate the risk of security and vulnerability attacks. Further, this study evaluates implementation of the SCPMP in the networked computing systems of an academic environment in order to: 1. Meet patch management requirements by applying SE principles. 2. Reduce the cost of IT operations and PVM cycles. 3. Improve the current PVM methodologies to prevent networked computing systems from becoming the targets of security vulnerability attacks. 4. Embed a Maintenance Optimization Tool (MOT) in the proposed framework. The MOT allows IT managers to make the most practicable choice of methods for deploying and installing released patches and vulnerability remediation. In recent years, there has been a variety of frameworks for security practices in every networked computing system to protect computer workstations from becoming compromised or vulnerable to security attacks, which can expose important information and critical data. I have developed a new mechanism for implementing PVM for maximizing security-vulnerability maintenance, protecting OS and software packages, and minimizing SCPMP cost. To increase computing system security in any diverse environment, particularly in academia, one must apply SCPMP. I propose an optimal maintenance policy that will allow ITDS to measure and estimate the variation of PVM cycles based on their department's requirements. My results demonstrate that MOT optimizes the process of implementing SCPMP in academic workstations.
Waste Management Information System (WMIS) User Guide
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. E. Broz
2008-12-22
This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data throuh the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal.
Total Quality Management: Implications for Educational Assessment.
ERIC Educational Resources Information Center
Rankin, Stuart C.
1992-01-01
Deming's "System of Profound Knowledge" is even more fundamental than his 14-principle system transformation guide and is based on 4 elements: systems theory, statistical variation, a theory of knowledge, and psychology. Management should revamp total system processes so that quality of product is continually improved. Implications for…
Information Systems for University Planning.
ERIC Educational Resources Information Center
Robinson, Robert J.
This paper proposes construction of a separate data base environment for university planning information, distinct from data bases and systems supporting operational functioning and management. The data base would receive some of its input from the management information systems (MIS)/transactional data bases and systems through a process of…
LONS: Learning Object Negotiation System
NASA Astrophysics Data System (ADS)
García, Antonio; García, Eva; de-Marcos, Luis; Martínez, José-Javier; Gutiérrez, José-María; Gutiérrez, José-Antonio; Barchino, Roberto; Otón, Salvador; Hilera, José-Ramón
This system comes up as a result of the increase of e-learning systems. It manages all relevant modules in this context, such as the association of digital rights with the contents (courses), management and payment processing on rights. There are three blocks:
48 CFR 1034.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2011 CFR
2011-10-01
... which the management process provides effective and integrated technical/schedule/cost planning and... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202...
Process models as tools in forestry research and management
Kurt Johnsen; Lisa Samuelson; Robert Teskey; Steve McNulty; Tom Fox
2001-01-01
Forest process models are mathematical representations of biological systems that incorporate our understanding of physiological and ecological mechanisms into predictive algorithms. These models were originally designed and used for research purposes, but are being developed for use in practical forest management. Process models designed for research...
On-Board File Management and Its Application in Flight Operations
NASA Technical Reports Server (NTRS)
Kuo, N.
1998-01-01
In this paper, the author presents the minimum functions required for an on-board file management system. We explore file manipulation processes and demonstrate how the file transfer along with the file management system will be utilized to support flight operations and data delivery.
DOT National Transportation Integrated Search
2006-08-01
A Freeway Management System (FMS) employs various tools to manage a freeway to increase throughput and reduce delay : without additional lanes. The FMS acquires data from the roadway and process these data to identify and respond to : problems. If so...
Proposal for a Security Management in Cloud Computing for Health Care
Dzombeta, Srdan; Brandis, Knud
2014-01-01
Cloud computing is actually one of the most popular themes of information systems research. Considering the nature of the processed information especially health care organizations need to assess and treat specific risks according to cloud computing in their information security management system. Therefore, in this paper we propose a framework that includes the most important security processes regarding cloud computing in the health care sector. Starting with a framework of general information security management processes derived from standards of the ISO 27000 family the most important information security processes for health care organizations using cloud computing will be identified considering the main risks regarding cloud computing and the type of information processed. The identified processes will help a health care organization using cloud computing to focus on the most important ISMS processes and establish and operate them at an appropriate level of maturity considering limited resources. PMID:24701137
Proposal for a security management in cloud computing for health care.
Haufe, Knut; Dzombeta, Srdan; Brandis, Knud
2014-01-01
Cloud computing is actually one of the most popular themes of information systems research. Considering the nature of the processed information especially health care organizations need to assess and treat specific risks according to cloud computing in their information security management system. Therefore, in this paper we propose a framework that includes the most important security processes regarding cloud computing in the health care sector. Starting with a framework of general information security management processes derived from standards of the ISO 27000 family the most important information security processes for health care organizations using cloud computing will be identified considering the main risks regarding cloud computing and the type of information processed. The identified processes will help a health care organization using cloud computing to focus on the most important ISMS processes and establish and operate them at an appropriate level of maturity considering limited resources.
Advanced information processing system: Local system services
NASA Technical Reports Server (NTRS)
Burkhardt, Laura; Alger, Linda; Whittredge, Roy; Stasiowski, Peter
1989-01-01
The Advanced Information Processing System (AIPS) is a multi-computer architecture composed of hardware and software building blocks that can be configured to meet a broad range of application requirements. The hardware building blocks are fault-tolerant, general-purpose computers, fault-and damage-tolerant networks (both computer and input/output), and interfaces between the networks and the computers. The software building blocks are the major software functions: local system services, input/output, system services, inter-computer system services, and the system manager. The foundation of the local system services is an operating system with the functions required for a traditional real-time multi-tasking computer, such as task scheduling, inter-task communication, memory management, interrupt handling, and time maintenance. Resting on this foundation are the redundancy management functions necessary in a redundant computer and the status reporting functions required for an operator interface. The functional requirements, functional design and detailed specifications for all the local system services are documented.
Simpson, Roy L
2004-08-01
The Institute of Medicine's landmark report asserted that medical error is seldom the fault of individuals, but the result of faulty healthcare policy/procedure systems. Numerous studies have shown that information technology (IT) can shore up weak systems. For nursing, IT plays a key role in eliminating nursing mistakes. However, managing IT is a function of managing the people who use it. For nursing administrators, successful IT implementations depend on adroit management of the three 'P's: People, processes and (computer) programs. This paper examines critical issues for managing each entity. It discusses the importance of developing trusting organizations, the requirements of process change, how to implement technology in harmony with the organization and the significance of vision.
Total Quality Management: Will It Work in the System Program Office?
1990-05-01
Quality Management (TQM) is a relatively new philosophy of management which has high-level Department of Defense support and is presently being implemented in the Air Force. In the Air Force Systems Command, weapon system development and acquisition are carried out in System Program Offices (SPOs), staffed with various functionally oriented specialists supplied to the System Program Director by functional ’home offices’ via a matrix management scheme. Can TQM, relying as it does on cross-functional cooperation and on processes which cross functional lines, be
NASA Technical Reports Server (NTRS)
Cooper, Lynne P.
2010-01-01
Users continuously evaluate the value and performance of their Knowledge Management Systems (KMS). As suggested by a punctuated socio-technical system process model, today's success can quickly become tomorrow's failure should the KMS fail to meet evolving needs and expectations. The more deeply a tool is embedded in the actual work process, the more vulnerable it is to emergent changes and perturbations. This paper uses the metaphor of a "3-stringed violin" to explore how differing levels of user knowledge about tools and processes can lead to system perturbations and how the active involvement of other actors can dampen the impact of perturbations, i.e., help the system survive the operational equivalent of a broken string. Recommendations suggest ways to increase system resiliency and contribute to incremental innovation.
Processing and Properties of a Phenolic Composite System
NASA Technical Reports Server (NTRS)
Hou, Tan-Hung; Bai, J. M.; Baughman, James M.
2006-01-01
Phenolic resin systems generate water as a reaction by-product via condensation reactions during curing at elevated temperatures. In the fabrication of fiber reinforced phenolic resin matrix composites, volatile management is crucial in producing void-free quality laminates. A commercial vacuum-bag moldable phenolic prepreg system was selected for this study. The traditional single-vacuum-bag (SVB) process was unable to manage the volatiles effectively, resulting in inferior voidy laminates. However, a double vacuum bag (DVB) process was shown to afford superior volatile management and consistently yielded void-free quality parts. The DVB process cure cycle (temperature /pressure profiles) for the selected composite system was designed, with the vacuum pressure application point carefully selected, to avoid excessive resin squeeze-outs and achieve the net shape and target resin content in the final consolidated laminate parts. Laminate consolidation quality was characterized by optical photomicrography for the cross sections and measurements of mechanical properties. A 40% increase in short beam shear strength, 30% greater flexural strength, 10% higher tensile and 18% higher compression strengths were obtained in composite laminates fabricated by the DVB process.
ERIC Educational Resources Information Center
Özden, Bülent
2016-01-01
The purpose of this study was to determine the changes in the perception of teacher candidates towards scientific research process and their self-efficacy in this process, during Scientific Research Methods course that has been conducted using "Learning Management System" based on out-of-class learning activities. Being designed as a…
ISO 55000: Creating an asset management system.
Bradley, Chris; Main, Kevin
2015-02-01
In the October 2014 issue of HEJ, Keith Hamer, group vice-president, Asset Management & Engineering at Sodexo, and marketing director at Asset Wisdom, Kevin Main, argued that the new ISO 55000 standards present facilities managers with an opportunity to create 'a joined-up, whole lifecycle approach' to managing and delivering value from assets. In this article, Kevin Main and Chris Bradley, who runs various asset management projects, examine the process of creating an asset management system.
Improvements to information management systems simulator
NASA Technical Reports Server (NTRS)
Bilek, R. W.
1972-01-01
The performance of personnel in the augmentation and improvement of the interactive IMSIM information management simulation model is summarized. With this augmented model, NASA now has even greater capabilities for the simulation of computer system configurations, data processing loads imposed on these configurations, and executive software to control system operations. Through these simulations, NASA has an extremely cost effective capability for the design and analysis of computer-based data management systems.
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kellie, C.L.
This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.
2017 Joint Annual NDIA/AIA Industrial Security Committee Fall Conference
2017-11-15
beyond credit data to offer the insights that government professionals need to make informed decisions and ensure citizen safety, manage compliance...business that provides information technology and professional services. We specialize in managing business processes and systems integration for both... Information Security System ISFD Industrial Security Facilities Database OBMS ODAA Business Management System STEPP Security, Training, Education and
Introduction to the Management Process (NS 222): Competency-Based Course Syllabus.
ERIC Educational Resources Information Center
Brady, Marilyn H.
"Introduction to the Management Process" (NS 222) is an associate degree nursing course offered at Chattanooga State Technical Community College to introduce students to basic management concepts, methods of nursing care delivery, patient classification systems, and methods of enacting change and working as a change agent. Upon completion of the…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-03
... submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction... found through the PHAS assessment process (management, financial, physical, or resident related) and any... in a PHA's operations found through the PHAS assessment process (management, financial, physical, or...
Operational Management System for Regulated Water Systems
NASA Astrophysics Data System (ADS)
van Loenen, A.; van Dijk, M.; van Verseveld, W.; Berger, H.
2012-04-01
Most of the Dutch large rivers, canals and lakes are controlled by the Dutch water authorities. The main reasons concern safety, navigation and fresh water supply. Historically the separate water bodies have been controlled locally. For optimizating management of these water systems an integrated approach was required. Presented is a platform which integrates data from all control objects for monitoring and control purposes. The Operational Management System for Regulated Water Systems (IWP) is an implementation of Delft-FEWS which supports operational control of water systems and actively gives advice. One of the main characteristics of IWP is that is real-time collects, transforms and presents different types of data, which all add to the operational water management. Next to that, hydrodynamic models and intelligent decision support tools are added to support the water managers during their daily control activities. An important advantage of IWP is that it uses the Delft-FEWS framework, therefore processes like central data collection, transformations, data processing and presentation are simply configured. At all control locations the same information is readily available. The operational water management itself gains from this information, but it can also contribute to cost efficiency (no unnecessary pumping), better use of available storage and advise during (water polution) calamities.
Monroe, C Douglas; Chin, Karen Y
2013-05-01
The specialty pharmaceuticals market is expanding more rapidly than the traditional pharmaceuticals market. Specialty pharmacy operations have evolved to deliver selected medications and associated clinical services. The growing role of specialty drugs requires new approaches to managing the use of these drugs. The focus, expectations, and emphasis in specialty drug management in an integrated health care delivery system such as Kaiser Permanente (KP) can vary as compared with more conventional health care systems. The KP Specialty Pharmacy (KP-SP) serves KP members across the United States. This descriptive account addresses the impetus for specialty drug management within KP, the use of tools such as an electronic health record (EHR) system and process management software, the KP-SP approach for specialty pharmacy services, and the emphasis on quality measurement of services provided. Kaiser Permanente's integrated system enables KP-SP pharmacists to coordinate the provision of specialty drugs while monitoring laboratory values, physician visits, and most other relevant elements of the patient's therapy. Process management software facilitates the counseling of patients, promotion of adherence, and interventions to resolve clinical, logistic, or pharmacy benefit issues. The integrated EHR affords KP-SP pharmacists advantages for care management that should become available to more health care systems with broadened adoption of EHRs. The KP-SP experience may help to establish models for clinical pharmacy services as health care systems and information systems become more integrated.
[Does clinical risk management require a structured conflict management?].
Neumann, Stefan
2015-01-01
A key element of clinical risk management is the analysis of errors causing near misses or patient damage. After analyzing the causes and circumstances, measures for process improvement have to be taken. Process management, human resource development and other established methods are used. If an interpersonal conflict is a contributory factor to the error, there is usually no structured conflict management available which includes selection criteria for various methods of conflict processing. The European University Viadrina in Frankfurt (Oder) has created a process model for introducing a structured conflict management system which is suitable for hospitals and could fill the gap in the methodological spectrum of clinical risk management. There is initial evidence that a structured conflict management reduces staff fluctuation and hidden conflict costs. This article should be understood as an impulse for discussion on to what extent the range of methods of clinical risk management should be complemented by conflict management.
College & University Business Administration. Third Edition.
ERIC Educational Resources Information Center
National Association of College and University Business Officers, Washington, DC.
This text presents indepth coverage of five areas of college and university business administration, including administrative management, business management, fiscal management, and financial accounting and reporting. The section on administrative management encompasses institutional planning, management information systems and data processing,…
Sapunar, Damir; Grković, Ivica; Lukšić, Davor; Marušić, Matko
2016-05-01
Our aim was to describe a comprehensive model of internal quality management (QM) at a medical school founded on the business process analysis (BPA) software tool. BPA software tool was used as the core element for description of all working processes in our medical school, and subsequently the system served as the comprehensive model of internal QM. The quality management system at the University of Split School of Medicine included the documentation and analysis of all business processes within the School. The analysis revealed 80 weak points related to one or several business processes. A precise analysis of medical school business processes allows identification of unfinished, unclear and inadequate points in these processes, and subsequently the respective improvements and increase of the QM level and ultimately a rationalization of the institution's work. Our approach offers a potential reference model for development of common QM framework allowing a continuous quality control, i.e. the adjustments and adaptation to contemporary educational needs of medical students. Copyright © 2016 by Academy of Sciences and Arts of Bosnia and Herzegovina.
Clinical process analysis and activity-based costing at a heart center.
Ridderstolpe, Lisa; Johansson, Andreas; Skau, Tommy; Rutberg, Hans; Ahlfeldt, Hans
2002-08-01
Cost studies, productivity, efficiency, and quality of care measures, the links between resources and patient outcomes, are fundamental issues for hospital management today. This paper describes the implementation of a model for process analysis and activity-based costing (ABC)/management at a Heart Center in Sweden as a tool for administrative cost information, strategic decision-making, quality improvement, and cost reduction. A commercial software package (QPR) containing two interrelated parts, "ProcessGuide and CostControl," was used. All processes at the Heart Center were mapped and graphically outlined. Processes and activities such as health care procedures, research, and education were identified together with their causal relationship to costs and products/services. The construction of the ABC model in CostControl was time-consuming. However, after the ABC/management system was created, it opened the way for new possibilities including process and activity analysis, simulation, and price calculations. Cost analysis showed large variations in the cost obtained for individual patients undergoing coronary artery bypass grafting (CABG) surgery. We conclude that a process-based costing system is applicable and has the potential to be useful in hospital management.
Implementing Earned Value Management in the CxP EVA Systems Project Office
NASA Technical Reports Server (NTRS)
Sorge, Les L.
2009-01-01
Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.
NASA Astrophysics Data System (ADS)
Cheng, Xiaoyan; Zhang, Xiaoli; Xie, Fangyi
To get a more convenience work in forest application, GIS and information system is used in forestry. GIS technology is used to build an informational management system of forest disease. For the practical requirement, the system is implemented by PDA which works outside to help completing the data collection. The major function of the system is input and output of the forest disease data and processing the report which is based on the criteria report and the assistant function of GIS. This article is aim to discuss about the theory, the process and the critical points of the information system. Besides the general information management system, GIS and PDA is introduced into the diseases system, which could combine the map and the attribute information and realize inventory data reform by PDA. The system is developed with VB and SuperMap Object (SuperMap Company).
ERIC Educational Resources Information Center
National Bureau of Standards (DOC), Washington, DC.
These guidelines provide a handbook for use by federal organizations in structuring physical security and risk management programs for their automatic data processing facilities. This publication discusses security analysis, natural disasters, supporting utilities, system reliability, procedural measures and controls, off-site facilities,…
2006-04-01
and Scalability, (2) Sensors and Platforms, (3) Distributed Computing and Processing , (4) Information Management, (5) Fusion and Resource Management...use of the deployed system. 3.3 Distributed Computing and Processing Session The Distributed Computing and Processing Session consisted of three
Non-Procedural Languages for Information Resource Management.
ERIC Educational Resources Information Center
Bearley, William L.
The future of information resources management requires new approaches to implementing systems which will include a type of data base management that frees users to solve data processing problems logically by telling the system what they want, together with powerful non-procedural languages that will permit communication in simple, concise…
Managing Change from a Quality Perspective.
ERIC Educational Resources Information Center
Snyder, Karolyn J.
This paper presents findings of a study that examined the change process in 28 schools, with a focus on how principals went about transforming traditional school-work cultures into quality systems. The principals had participated in Managing Productive Schools (MPS), a comprehensive systems-approach program based on quality management concepts.…
77 FR 68746 - Privacy Act of 1974; System of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-16
... providing comprehensive content management and enterprise search, accelerating shared business processes... Management System Office, 4800 Mark Center Drive, East Tower, 2nd Floor, Suite 02G09, Alexandria, VA 22350... Committee on Governmental Affairs, and the Office of Management and Budget (OMB) pursuant to paragraph 4c of...
Technologies for ECLSS Evolution
NASA Technical Reports Server (NTRS)
Diamant, Bryce L.
1990-01-01
Viewgraphs and discussion on technologies for Environmental Control and Life Support System (ECLSS) evolution are presented. Topics covered include: atmosphere revitalization including CO2 removal, CO2 reduction, O2 generation, and trace contaminant control; water recovery and management including urine processing, hygiene water processing, and potable water processing; and waste management. ECLSS technology schematics, process diagrams, and fluid interfaces are included.
ERIC Educational Resources Information Center
Milwaukee Area Technical Coll., WI.
A study was conducted to develop a curriculum to meet the information processing/management training needs of persons entering or continuing careers in the information marketing area. The process used for the study was based on Stufflebeam's Context, Input, Process, Product (CIPP) model of evaluation. The information gathering process included a…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elia, Valerio; Gnoni, Maria Grazia, E-mail: mariagrazia.gnoni@unisalento.it; Tornese, Fabiana
Highlights: • Pay-As-You-Throw (PAYT) schemes are becoming widespread in several countries. • Economic, organizational and technological issues have to be integrated in an efficient PAYT model design. • Efficiency refers to a PAYT system which support high citizen participation rates as well as economic sustainability. • Different steps and constraints have to be evaluated from collection services to type technologies. • An holistic approach is discussed to support PAYT systems diffusion. - Abstract: Pay-As-You-Throw (PAYT) strategies are becoming widely applied in solid waste management systems; the main purpose is to support a more sustainable – from economic, environmental and socialmore » points of view – management of waste flows. Adopting PAYT charging models increases the complexity level of the waste management service as new organizational issues have to be evaluated compared to flat charging models. In addition, innovative technological solutions could also be adopted to increase the overall efficiency of the service. Unit pricing, user identification and waste measurement represent the three most important processes to be defined in a PAYT system. The paper proposes a holistic framework to support an effective design and management process. The framework defines most critical processes and effective organizational and technological solutions for supporting waste managers as well as researchers.« less
NASA Technical Reports Server (NTRS)
Tompkins, F. G.
1983-01-01
This report presents guidance to NASA Computer security officials for developing ADP security risk management plans. The six components of the risk management process are identified and discussed. Guidance is presented on how to manage security risks that have been identified during a risk analysis performed at a data processing facility or during the security evaluation of an application system.
A plan for structured management of the Systems Approach to Training (SAT) process
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schurman, D.L.
1987-01-01
This paper describes the plan and accomplishments for development of a Systematic Management Plan for the Systems Approach to Training (SMPSAT). This project is sponsored by the United States Marine Corps Headquarters training policy branch (HQMC(TAP)). Purpose of this effort is to develop a comprehensive plan for management of the Systems Approach to Training (SAT) system in the USMC. This management plan will allow HQMC to monitor the SAT system in order to provide maximum support to the SAT system in both the formal schools and the Fleet Marine Force.
Links, Amanda E.; Draper, David; Lee, Elizabeth; Guzman, Jessica; Valivullah, Zaheer; Maduro, Valerie; Lebedev, Vlad; Didenko, Maxim; Tomlin, Garrick; Brudno, Michael; Girdea, Marta; Dumitriu, Sergiu; Haendel, Melissa A.; Mungall, Christopher J.; Smedley, Damian; Hochheiser, Harry; Arnold, Andrew M.; Coessens, Bert; Verhoeven, Steven; Bone, William; Adams, David; Boerkoel, Cornelius F.; Gahl, William A.; Sincan, Murat
2016-01-01
The National Institutes of Health Undiagnosed Diseases Program (NIH UDP) applies translational research systematically to diagnose patients with undiagnosed diseases. The challenge is to implement an information system enabling scalable translational research. The authors hypothesized that similar complex problems are resolvable through process management and the distributed cognition of communities. The team, therefore, built the NIH UDP integrated collaboration system (UDPICS) to form virtual collaborative multidisciplinary research networks or communities. UDPICS supports these communities through integrated process management, ontology-based phenotyping, biospecimen management, cloud-based genomic analysis, and an electronic laboratory notebook. UDPICS provided a mechanism for efficient, transparent, and scalable translational research and thereby addressed many of the complex and diverse research and logistical problems of the NIH UDP. Full definition of the strengths and deficiencies of UDPICS will require formal qualitative and quantitative usability and process improvement measurement. PMID:27785453
Bosch, J; Bosch, J; Kemp, W P
2002-02-01
The development of a bee species as a new crop pollinator starts with the identification of a pollination-limited crop production deficit and the selection of one or more candidate pollinator species. The process continues with a series of studies on the developmental biology, pollinating efficacy, nesting behaviour, preference for different nesting substrates, and population dynamics of the candidate pollinator. Parallel studies investigate the biology of parasites, predators and pathogens. The information gained in these studies is combined with information on the reproductive biology of the crop to design a management system. Complete management systems should provide guidelines on rearing and releasing methods, bee densities required for adequate pollination, nesting materials, and control against parasites, predators and pathogens. Management systems should also provide methods to ensure a reliable pollinator supply. Pilot tests on a commercial scale are then conducted to test and eventually refine the management system. The process culminates with the delivery of a viable system to manage and sustain the new pollinator on a commercial scale. The process is illustrated by the development of three mason bees, Osmia cornifrons (Radoszkowski), O. lignaria Say and O. cornuta (Latreille) as orchard pollinators in Japan, the USA and Europe, respectively.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
... automated case management system, to process complaints, compliance reviews, and to track the activities... comment on the new system of records. The new system report was submitted to the Office of Management and... a New Privacy Act System of Records, Title Eight Automated Paperless Office Tracking System (TEAPOTS...
Developing an Environmental Decision Support System for Stream Management: the STREAMES Experience
NASA Astrophysics Data System (ADS)
Riera, J.; Argerich, A.; Comas, J.; Llorens, E.; Martí, E.; Godé, L.; Pargament, D.; Puig, M.; Sabater, F.
2005-05-01
Transferring research knowledge to stream managers is crucial for scientifically sound management. Environmental decision support systems are advocated as an effective means to accomplish this. STREAMES (STream REAach Management: an Expert System) is a decision tree based EDSS prototype developed within the context of an European project as a tool to assist water managers in the diagnosis of problems, detection of causes, and selection of management strategies for coping with stream degradation issues related mostly to excess nutrient availability. STREAMES was developed by a team of scientists, water managers, and experts in knowledge engineering. Although the tool focuses on management at the stream reach scale, it also incorporates a mass-balance catchment nutrient emission model and a simple GIS module. We will briefly present the prototype and share our experience in its development. Emphasis will be placed on the process of knowledge acquisition, the design process, the pitfalls and benefits of the communication between scientists and managers, and the potential for future development of STREAMES, particularly in the context of the EU Water Framework Directive.
Schrader, Ulrich
2006-01-01
At the university of applied sciences in Germany a learning management system has been implemented. The migration of classic courses to a web-enhances curriculum can be categorized into three phases independent of the technology used. The first two phases "dedicated website" and "database supported content management system" are mainly concerned with bringing the learning material and current information online and making it available to the students. The goal is here to make the maintenance of the learning material easier. The third phase characterized by the use of a learning management system offers the support of more modern didactic principles like social constructionism or problem-oriented learning. In this papers the phases as they occurred with the migration of a course of nursing informatics are described and experiences discussed.. The absence of institutional goals associated with the use of a learning management system led to a bottom-up approach triggered by faculty activities that can be described by a promoter model rather than by a process management model. The use of an open source learning management systems made this process easier to realize since no financial commitment is required up front.
Mutemwa, Richard I
2006-01-01
At the onset of health system decentralization as a primary health care strategy, which constituted a key feature of health sector reforms across the developing world, efficient and effective health management information systems (HMIS) were widely acknowledged and adopted as a critical element of district health management strengthening programmes. The focal concern was about the performance and long-term sustainability of decentralized district health systems. The underlying logic was that effective and efficient HMIS would provide district health managers with the information required to make effective strategic decisions that are the vehicle for district performance and sustainability in these decentralized health systems. However, this argument is rooted in normative management and decision theory without significant unequivocal empirical corroboration. Indeed, extensive empirical evidence continues to indicate that managers' decision-making behaviour and the existence of other forms of information outside the HMIS, within the organizational environment, suggest a far more tenuous relationship between the presence of organizational management information systems (such as HMIS) and effective strategic decision-making. This qualitative comparative case-study conducted in two districts of Zambia focused on investigating the presence and behaviour of five formally identified, different information forms, including that from HMIS, in the strategic decision-making process. The aim was to determine the validity of current arguments for HMIS, and establish implications for current HMIS policies. Evidence from the eight strategic decision-making processes traced in the study confirmed the existence of different forms of information in the organizational environment, including that provided by the conventional HMIS. These information forms attach themselves to various organizational management processes and key aspects of organizational routine. The study results point to the need for a radical re-think of district health management information solutions in ways that account for the existence of other information forms outside the formal HMIS in the district health system.
Natural resources information system.
NASA Technical Reports Server (NTRS)
Leachtenauer, J. C.; Woll, A. M.
1972-01-01
A computer-based Natural Resources Information System was developed for the Bureaus of Indian Affairs and Land Management. The system stores, processes and displays data useful to the land manager in the decision making process. Emphasis is placed on the use of remote sensing as a data source. Data input consists of maps, imagery overlays, and on-site data. Maps and overlays are entered using a digitizer and stored as irregular polygons, lines and points. Processing functions include set intersection, union and difference and area, length and value computations. Data output consists of computer tabulations and overlays prepared on a drum plotter.
A new specimen management system using RFID technology.
Shim, Hun; Uh, Young; Lee, Seung Hwan; Yoon, Young Ro
2011-12-01
The specimen management system with barcode needs to be improved in order to solve inherent problems in work performance. This study describes the application of Radio Frequency Identification (RFID) which is the solution for the problems associated with specimen labeling and management. A new specimen management system and architecture with RFID technology for clinical laboratory was designed. The suggested system was tested in various conditions such as durability to temperature and aspect of effective utilization of new work flow under a virtual hospital clinical laboratory environment. This system demonstrates its potential application in clinical laboratories for improving work flow and specimen management. The suggested specimen management system with RFID technology has advantages in comparison to the traditional specimen management system with barcode in the aspect of mass specimen processing, robust durability of temperature, humidity changes, and effective specimen tracking.
Conceptual information processing: A robust approach to KBS-DBMS integration
NASA Technical Reports Server (NTRS)
Lazzara, Allen V.; Tepfenhart, William; White, Richard C.; Liuzzi, Raymond
1987-01-01
Integrating the respective functionality and architectural features of knowledge base and data base management systems is a topic of considerable interest. Several aspects of this topic and associated issues are addressed. The significance of integration and the problems associated with accomplishing that integration are discussed. The shortcomings of current approaches to integration and the need to fuse the capabilities of both knowledge base and data base management systems motivates the investigation of information processing paradigms. One such paradigm is concept based processing, i.e., processing based on concepts and conceptual relations. An approach to robust knowledge and data base system integration is discussed by addressing progress made in the development of an experimental model for conceptual information processing.
Strategic management of health care information systems: nurse managers' perceptions.
Lammintakanen, Johanna; Kivinen, Tuula; Saranto, Kaija; Kinnunen, Juha
2009-01-01
The aim of this study is to describe nurse managers' perceptions of the strategic management of information systems in health care. Lack of strategic thinking is a typical feature in health care and this may also concern information systems. The data for this study was collected by eight focus group interviews including altogether 48 nurse managers from primary and specialised health care. Five main categories described the strategic management of information systems in health care; IT as an emphasis of strategy; lack of strategic management of information systems; the importance of management; problems in privacy protection; and costs of IT. Although IT was emphasised in the strategies of many health care organisations, a typical feature was a lack of strategic management of information systems. This was seen both as an underutilisation of IT opportunities in health care organisations and as increased workload from nurse managers' perspective. Furthermore, the nurse managers reported that implementation of IT strengthened their managerial roles but also required stronger management. In conclusion, strategic management of information systems needs to be strengthened in health care and nurse managers should be more involved in this process.
Spectrum Management Guidelines for National and Service Test and Training Ranges
2017-07-12
GPS Global Positioning System ISM Installation Spectrum Manager JTIDS Joint Tactical Information Distribution System KMR Kwajalein Missile Range... information UAV unmanned aerial vehicle US&P United States and Possessions Spectrum Management Guidelines for National and Service Test and Training...frequency deconfliction processes. The AFC will inform the range or center commander and the Installation Spectrum Manager (ISM) at the
The Determination of Navy Family Housing Requirements
1992-04-01
for greater precision and responsiveness, closer scrutiny of Navy family housing programs, and internal initiatives relating to quality management ...DETERMINATION SYSTEM Overview For almost 20 years, the Navy has used a semiautomated system to project family housing requirements. This process is managed ... Family Housing Management Institute (FHMI) materials, and management specifications maintained by NAVFAC and FACSO. FINDINGS Theory We believe that the
Managing Quality and Safety in Real Time? Evidence from an Interview Study.
Randell, Rebecca; Keen, Justin; Gates, Cara; Ferguson, Emma; Long, Andrew; Ginn, Claire; McGinnis, Elizabeth; Whittle, Jackie
2016-01-01
Health systems around the world are investing increasing effort in monitoring care quality and safety. Dashboards can support this process, providing summary data on processes and outcomes of care, making use of data visualization techniques such as graphs. As part of a study exploring development and use of dashboards in English hospitals, we interviewed senior managers across 15 healthcare providers. Findings revealed substantial variation in sophistication of the dashboards in place, largely presenting retrospective data items determined by national bodies and dependent on manual collation from a number of systems. Where real time systems were in place, they supported staff in proactively managing quality and safety.
Computer versus paper system for recognition and management of sepsis in surgical intensive care.
Croft, Chasen A; Moore, Frederick A; Efron, Philip A; Marker, Peggy S; Gabrielli, Andrea; Westhoff, Lynn S; Lottenberg, Lawrence; Jordan, Janeen; Klink, Victoria; Sailors, R Matthew; McKinley, Bruce A
2014-02-01
A system to provide surveillance, diagnosis, and protocolized management of surgical intensive care unit (SICU) sepsis was undertaken as a performance improvement project. A system for sepsis management was implemented for SICU patients using paper followed by a computerized system. The hypothesis was that the computerized system would be associated with improved process and outcomes. A system was designed to provide early recognition and guide patient-specific management of sepsis including (1) modified early warning signs-sepsis recognition score (MEWS-SRS; summative point score of ranges of vital signs, mental status, white blood cell count; after every 4 hours) by bedside nurse; (2) suspected site assessment (vascular access, lung, abdomen, urinary tract, soft tissue, other) at bedside by physician or extender; (3) sepsis management protocol (replicable, point-of-care decisions) at bedside by nurse, physician, and extender. The system was implemented first using paper and then a computerized system. Sepsis severity was defined using standard criteria. In January to May 2012, a paper system was used to manage 77 consecutive sepsis encounters (3.9 ± 0.5 cases per week) in 65 patients (77% male; age, 53 ± 2 years). In June to December 2012, a computerized system was used to manage 132 consecutive sepsis encounters (4.4 ± 0.4 cases per week) in 119 patients (63% male; age, 58 ± 2 years). MEWS-SRS elicited 683 site assessments, and 201 had sepsis diagnosis and protocol management. The predominant site of infection was abdomen (paper, 58%; computer, 53%). Recognition of early sepsis tended to occur more using the computerized system (paper, 23%; computer, 35%). Hospital mortality rate for surgical ICU sepsis (paper, 20%; computer, 14%) was less with the computerized system. A computerized sepsis management system improves care process and outcome. Early sepsis is recognized and managed with greater frequency compared with severe sepsis or septic shock. The system has a beneficial effect as a clinical standard of care for SICU patients. Therapeutic study, level III.
Management. A continuing bibliography with indexes. [March 1980
NASA Technical Reports Server (NTRS)
1980-01-01
This bibliography cites 604 reports, articles, and other documents introduced into the NASA scientific and technical information system in 1979 covering the management of research and development, contracts, production, logistics, personnel, safety, reliability and quality control. Program, project, and systems management; management policy, philosophy, tools, and techniques; decision making processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting are also covered. Abstracts are provided as well as subject, personal author, and corporate source indexes.
NASA Astrophysics Data System (ADS)
Malek, A. K.; Muhammad, H. I.; Rosmaini, A.; Alaa, A. S.; Falah, A. M.
2017-09-01
Development and improvement process are essential to the companies and factories of various kinds and this necessity is related aspects of cost, time and risk that can be avoided, these aspects are available at the nuclear power stations essential demands cannot be ignored. The lean management technique is one of the recent trends in the management system. Where the lean management is stated as the system increases the customer value and reduces the wastage process in an industry or in a power plants. Therefore, there is an urgent necessity to ensure the development and improvement in nuclear power plants in the pre-established in process of being established and stage of the management and production. All of these stages according to the study are closely related to the necessity operationalize and apply lean manufacturing practices that these applications are ineffective and clear contribution to reduce costs and control of production processes and the process of reducing future risks that could be exposed to the station.
NASA Astrophysics Data System (ADS)
The effective integration of processes, systems, and procedures used in the production of aerospace systems using computer technology is managed by the Integration Technology Division (MTI). Under its auspices are the Information Management Branch, which is actively involved with information management, information sciences and integration, and the Implementation Branch, whose technology areas include computer integrated manufacturing, engineering design, operations research, and material handling and assembly. The Integration Technology Division combines design, manufacturing, and supportability functions within the same organization. The Processing and Fabrication Division manages programs to improve structural and nonstructural materials processing and fabrication. Within this division, the Metals Branch directs the manufacturing methods program for metals and metal matrix composites processing and fabrication. The Nonmetals Branch directs the manufacturing methods programs, which include all manufacturing processes for producing and utilizing propellants, plastics, resins, fibers, composites, fluid elastomers, ceramics, glasses, and coatings. The objective of the Industrial Base Analysis Division is to act as focal point for the USAF industrial base program for productivity, responsiveness, and preparedness planning.
Managing for climate change on protected areas: An adaptive management decision making framework.
Tanner-McAllister, Sherri L; Rhodes, Jonathan; Hockings, Marc
2017-12-15
Current protected area management is becoming more challenging with advancing climate change and current park management techniques may not be adequate to adapt for effective management into the future. The framework presented here provides an adaptive management decision making process to assist protected area managers with adapting on-park management to climate change. The framework sets out a 4 step process. One, a good understanding of the park's context within climate change. Secondly, a thorough understanding of the park management systems including governance, planning and management systems. Thirdly, a series of management options set out as an accept/prevent change style structure, including a systematic assessment of those options. The adaptive approaches are defined as acceptance of anthropogenic climate change impact and attempt to adapt to a new climatic environment or prevention of change and attempt to maintain current systems under new climatic variations. Last, implementation and monitoring of long term trends in response to ecological responses to management interventions and assessing management effectiveness. The framework addresses many issues currently with park management in dealing with climate change including the considerable amount of research focussing on 'off-reserve' strategies, and threats and stress focused in situ park management. Copyright © 2017 Elsevier Ltd. All rights reserved.
[Quality management in emergency departments: Lack of uniform standards for fact-based controlling].
Ries, M; Christ, M
2015-11-01
The general high occupancy of emergency departments during the winter months of 2014/2015 outlined deficits in health politics. Whether on the regional, province, or federal level, verifiable and accepted figures to enable in depth analysis and fact-based controlling of emergency care systems are lacking. As the first step, reasons for the current situation are outlined in order to developed concrete recommendations for individual hospitals. This work is based on a selective literature search with focus on quality management, ratio driven management, and process management within emergency departments as well as personal experience with implementation of a key ratio system in a German maximum care hospital. The insufficient integration of emergencies into the DRG systematic, the role as gatekeeper between inpatient and outpatient care sector, the decentralized organization of emergency departments in many hospitals, and the inconsistent representation within the medical societies can be mentioned as reasons for the lack of key ratio systems. In addition to the important role within treatment procedures, emergency departments also have an immense economic importance. Consequently, the management of individual hospitals should promote implementation of key ratio systems to enable controlling of emergency care processes. Thereby the perspectives finance, employees, processes as well as partners and patients should be equally considered. Within the process perspective, milestones could be used to enable detailed controlling of treatment procedures. An implementation of key ratio systems without IT support is not feasible; thus, existing digital data should be used and future data analysis should already be considered during implementation of new IT systems.
Management of the water balance and quality in mining areas
NASA Astrophysics Data System (ADS)
Pasanen, Antti; Krogerus, Kirsti; Mroueh, Ulla-Maija; Turunen, Kaisa; Backnäs, Soile; Vento, Tiia; Veijalainen, Noora; Hentinen, Kimmo; Korkealaakso, Juhani
2015-04-01
Although mining companies have long been conscious of water related risks they still face environmental management problems. These problems mainly emerge because mine sites' water balances have not been adequately assessed in the stage of the planning of mines. More consistent approach is required to help mining companies identify risks and opportunities related to the management of water resources in all stages of mining. This approach requires that the water cycle of a mine site is interconnected with the general hydrologic water cycle. In addition to knowledge on hydrological conditions, the control of the water balance in the mining processes require knowledge of mining processes, the ability to adjust process parameters to variable hydrological conditions, adaptation of suitable water management tools and systems, systematic monitoring of amounts and quality of water, adequate capacity in water management infrastructure to handle the variable water flows, best practices to assess the dispersion, mixing and dilution of mine water and pollutant loading to receiving water bodies, and dewatering and separation of water from tailing and precipitates. WaterSmart project aims to improve the awareness of actual quantities of water, and water balances in mine areas to improve the forecasting and the management of the water volumes. The study is executed through hydrogeological and hydrological surveys and online monitoring procedures. One of the aims is to exploit on-line water quantity and quality monitoring for the better management of the water balances. The target is to develop a practical and end-user-specific on-line input and output procedures. The second objective is to develop mathematical models to calculate combined water balances including the surface, ground and process waters. WSFS, the Hydrological Modeling and Forecasting System of SYKE is being modified for mining areas. New modelling tools are developed on spreadsheet and system dynamics platforms to systematically integrate all water balance components (groundwater, surface water, infiltration, precipitation, mine water facilities and operations etc.) into overall dynamic mine site considerations. After coupling the surface and ground water models (e.g. Feflow and WSFS) with each other, they are compared with Goldsim. The third objective is to integrate the monitoring and modelling tools into the mine management system and process control. The modelling and predictive process control can prevent flood situations, ensure water adequacy, and enable the controlled mine water treatment. The project will develop a constantly updated management system for water balance including both natural waters and process waters.
Issues Management Process Course # 38401
DOE Office of Scientific and Technical Information (OSTI.GOV)
Binion, Ula Marie
The purpose of this training it to advise Issues Management Coordinators (IMCs) on the revised Contractor Assurance System (CAS) Issues Management (IM) process. Terminal Objectives: Understand the Laboratory’s IM process; Understand your role in the Laboratory’s IM process. Learning Objectives: Describe the IM process within the context of the CAS; Describe the importance of implementing an institutional IM process at LANL; Describe the process flow for the Laboratory’s IM process; Apply the definition of an issue; Use available resources to determine initial screening risk levels for issues; Describe the required major process steps for each risk level; Describe the personnelmore » responsibilities for IM process implementation; Access available resources to support IM process implementation.« less
NASA Technical Reports Server (NTRS)
Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil
2007-01-01
The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.
5 CFR 9901.221 - Classification requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Section 9901.221 Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM (NSPS) Classification Classification Process § 9901.221 Classification...
National Airspace System interface management plan
DOT National Transportation Integrated Search
1986-01-01
This document is intended to implement Interface Management for interfacing subsystems of the National Airspace System (NAS) and for external NAS interfaces by establishing a process which assures that: Interface requirements are agreed to by interfa...
Prolong Your Roof's Performance: Roof Asset Management.
ERIC Educational Resources Information Center
Teitsma, Jerry
2001-01-01
Discusses the roof asset management process for maintaining a roof system's integrity and value in a cost-effective manner. Included is a breakdown of roofing surface characteristics for multiply and single ply roofing systems. (GR)
Integrated Work Management: Overview, Course 31881
DOE Office of Scientific and Technical Information (OSTI.GOV)
Simpson, Lewis Edward
Integrated work management (IWM) is the process used for formally implementing the five-step process associated with integrated safety management (ISM) and integrated safeguards and security management (ISSM) at Los Alamos National Laboratory (LANL). IWM also directly supports the LANL Environmental Management System (EMS). IWM helps all workers and managers perform work safely and securely and in a manner that protects people, the environment, property, and the security of the nation. The IWM process applies to all work activities at LANL, from working in the office to designing experiments to assembling and detonating explosives. The primary LANL document that establishes andmore » describes IWM requirements is Procedure (P) 300, Integrated Work Management.« less
NASA Astrophysics Data System (ADS)
Setiawan, Wawan; Munir, Senen, Syamsul Hadi; Nugroho, Eddy Prasetyo; Wihardi, Yaya; Nugraha, Eki
2017-05-01
Indonesia strengthening school management through the implementation of School Management System Based Information Technology and Communications (SMS-ICT) is intended to improve the performance of schools to accommodate the complexities of management in a computerized system that is simple but comprehensive so that it aligns with the era of the 21st century. School Management System Based Information and Communication Technology-based standards developed 12 education, adapted from 8 national standards into the system components that support the characteristics of 21st century schools. Twelfth system components include curriculum, Personal Development, Recruitment of New Student Services and Student Development, Education Labor and Education, Infrastructure, Leadership, School Management, Financing, Evaluation, and Social Communications. Development of the system is done through the stages of systematically covering Need Assessment, System Design, System Development, Testing Limited, Reveiw and Improvement, Testing Expanded, Finalize, and Packaging. SMS-ICT has gained Copyright and had seminars both nationally and internationally, and have been published by national journals, and in a book chapter. SMS-ICT applied to several schools in districy/city of West Java is based on cooperation with the Education Department of West Java. Implementation of School Management System as strengthening school management Indonesia shows the essential matters of school management. SMS-ICT managed to bring changes not only bring substantial improvements to the school how it should be managed, but also change the mindset of school leaders and teachers in ways of thinking and acting more professional in carrying out their respective duties. SMS-ICT managed as a unified system of governance that is integrated schools overall strategic component in an integrated system that implements ICT that has the capacity to process data and information quickly, accurately and reliably. SMS-ICT as a mainstay to foster confidence that their school is a superior school that can be presented and demonstrated significantly. School leaders have the managerial instrument to control and develop all essential aspects in a comprehensive school. Empowering ICT appropriately and productively in school management processes, not only as a substitute for a typewriter and not only as a display.
Determining climate change management priorities: A case study from Wisconsin
LeDee, Olivia E.; Ribic, Christine
2015-01-01
A burgeoning dialogue exists regarding how to allocate resources to maximize the likelihood of long-term biodiversity conservation within the context of climate change. To make effective decisions in natural resource management, an iterative, collaborative, and learning-based decision process may be more successful than a strictly consultative approach. One important, early step in a decision process is to identify priority species or systems. Although this promotes the conservation of select species or systems, it may inadvertently alter the future of non-target species and systems. We describe a process to screen terrestrial wildlife for potential sensitivity to climate change and then use the results to engage natural resource professionals in a process of identifying priorities for monitoring, research, and adaptation strategy implementation. We demonstrate this approach using a case study from Wisconsin. In Wisconsin, experts identified 23 out of 353 species with sufficient empirical research and management understanding to inform targeted action. Habitat management and management of hydrological conditions were the common strategies for targeted action. Although there may be an interest in adaptation strategy implementation for many species and systems, experts considered existing information inadequate to inform targeted action. According to experts, 40% of the vertebrate species in Wisconsin will require near-term intervention for climate adaptation. These results will inform state-wide conservation planning as well as regional efforts.