ERIC Educational Resources Information Center
Perley, Gordon F.
This is a guide for standard operating job procedures for the pump station process of wastewater treatment plants. Step-by-step instructions are given for pre-start up inspection, start-up procedures, continuous routine operation procedures, and shut-down procedures. A general description of the equipment used in the process is given. Two…
ERIC Educational Resources Information Center
West, Alfred W.
This is the third in a series of documents developed by the National Training and Operational Technology Center describing operational control procedures for the activated sludge process used in wastewater treatment. This document deals with the calculation procedures associated with a step-feed process. Illustrations and examples are included to…
Code of Federal Regulations, 2013 CFR
2013-07-01
... covered process have been trained or tested competent in the operating procedures provided in § 68.52 that... safely carry out the duties and responsibilities as provided in the operating procedures. (b) Refresher... operating procedures of the process. The owner or operator, in consultation with the employees operating the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... covered process have been trained or tested competent in the operating procedures provided in § 68.52 that... safely carry out the duties and responsibilities as provided in the operating procedures. (b) Refresher... operating procedures of the process. The owner or operator, in consultation with the employees operating the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... covered process have been trained or tested competent in the operating procedures provided in § 68.52 that... safely carry out the duties and responsibilities as provided in the operating procedures. (b) Refresher... operating procedures of the process. The owner or operator, in consultation with the employees operating the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... covered process have been trained or tested competent in the operating procedures provided in § 68.52 that... safely carry out the duties and responsibilities as provided in the operating procedures. (b) Refresher... operating procedures of the process. The owner or operator, in consultation with the employees operating the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... covered process have been trained or tested competent in the operating procedures provided in § 68.52 that... safely carry out the duties and responsibilities as provided in the operating procedures. (b) Refresher... operating procedures of the process. The owner or operator, in consultation with the employees operating the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
...) of the Aircraft Certification Service (AIR) Process for the Sequencing of Certification and... on the Aircraft Certification Service (AIR) standard operating procedure (SOP) describing the process... comments on the SOP : AIR-100-001; Standard Operating Procedure--Aircraft Certification Service Project...
Operational Control Procedures for the Activated Sludge Process, Part III-A: Calculation Procedures.
ERIC Educational Resources Information Center
West, Alfred W.
This is the second in a series of documents developed by the National Training and Operational Technology Center describing operational control procedures for the activated sludge process used in wastewater treatment. This document deals exclusively with the calculation procedures, including simplified mixing formulas, aeration tank…
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 2 Prevention Program § 68.52 Operating procedures. (a) The... for safely conducting activities associated with each covered process consistent with the safety information for that process. Operating procedures or instructions provided by equipment manufacturers or...
Computerized procedures system
Lipner, Melvin H.; Mundy, Roger A.; Franusich, Michael D.
2010-10-12
An online data driven computerized procedures system that guides an operator through a complex process facility's operating procedures. The system monitors plant data, processes the data and then, based upon this processing, presents the status of the current procedure step and/or substep to the operator. The system supports multiple users and a single procedure definition supports several interface formats that can be tailored to the individual user. Layered security controls access privileges and revisions are version controlled. The procedures run on a server that is platform independent of the user workstations that the server interfaces with and the user interface supports diverse procedural views.
ERIC Educational Resources Information Center
Deal, Gerald A.; Montgomery, James A.
This guide describes standard operating job procedures for the grit removal process of wastewater treatment plants. Step-by-step instructions are given for pre-start up inspection, start-up, continuous operation, and shut-down procedures. A description of the equipment used in the process is given. Some theoretical material is presented. (BB)
ERIC Educational Resources Information Center
Petrasek, Al, Jr.
This guide describes the standard operating job procedures for the tertiary chemical treatment - lime precipitation process of wastewater treatment plants. Step-by-step instructions are given for pre-start up, start-up, continuous operation, and shut-down procedures. In addition, some theoretical material is presented along with some relevant…
40 CFR 63.543 - What are my standards for process vents?
Code of Federal Regulations, 2013 CFR
2013-07-01
... available. You must develop and follow standard operating procedures designed to minimize emissions of total... the manufacturer's recommended procedures, if available, and the standard operating procedures... 40 Protection of Environment 10 2013-07-01 2013-07-01 false What are my standards for process...
40 CFR 63.543 - What are my standards for process vents?
Code of Federal Regulations, 2012 CFR
2012-07-01
... available. You must develop and follow standard operating procedures designed to minimize emissions of total... the manufacturer's recommended procedures, if available, and the standard operating procedures... 40 Protection of Environment 10 2012-07-01 2012-07-01 false What are my standards for process...
40 CFR 63.543 - What are my standards for process vents?
Code of Federal Regulations, 2014 CFR
2014-07-01
... develop and follow standard operating procedures designed to minimize emissions of total hydrocarbon for... manufacturer's recommended procedures, if available, and the standard operating procedures designed to minimize... 40 Protection of Environment 10 2014-07-01 2014-07-01 false What are my standards for process...
US EPA Base Study Standard Operating Procedure for Data Processing and Data Management
The purpose of the Standard Operating Procedures (SOP) for data management and data processing is to facilitate consistent documentation and completion of data processing duties and management responsibilities in order to maintain a high standard of data quality.
Operational Control Procedures for the Activated Sludge Process: Appendix.
ERIC Educational Resources Information Center
West, Alfred W.
This document is the appendix for a series of documents developed by the National Training and Operational Technology Center describing operational control procedures for the activated sludge process used in wastewater treatment. Categories discussed include: control test data, trend charts, moving averages, semi-logarithmic plots, probability…
ERIC Educational Resources Information Center
Schwing, Carl M.
This guide describes standard operating job procedures for the digestion process of wastewater treatment facilities. This process is for reducing the volume of sludge to be treated in subsequent units and to reduce the volatile content of sludge. The guide gives step-by-step instructions for pre-startup, startup, continuous operating, shutdown,…
ERIC Educational Resources Information Center
Petrasek, Al, Jr.
This guide describes the standard operating job procedures for the tertiary multimedia filtration process of wastewater treatment plants. The major objective of the filtration process is the removal of suspended solids from the reclaimed wastewater. The guide gives step-by-step instructions for pre-start up, start-up, continuous operation, and…
23 CFR 630.1008 - State-level processes and procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... review are intended to lead to improvements in work zone processes and procedures, data and information... 23 Highways 1 2010-04-01 2010-04-01 false State-level processes and procedures. 630.1008 Section... OPERATIONS PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1008 State-level processes and...
40 CFR 240.200-3 - Recommended procedures: Operations.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended Procedures § 240.200-3 Recommended procedures: Operations. (a) Storage areas for special wastes should be... acceptance of Special Wastes. ...
40 CFR 240.200-3 - Recommended procedures: Operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended Procedures § 240.200-3 Recommended procedures: Operations. (a) Storage areas for special wastes should be... acceptance of Special Wastes. ...
47 CFR 36.379 - Message processing expense.
Code of Federal Regulations, 2010 CFR
2010-10-01
... JURISDICTIONAL SEPARATIONS PROCEDURES; STANDARD PROCEDURES FOR SEPARATING TELECOMMUNICATIONS PROPERTY COSTS... Customer Operations Expenses § 36.379 Message processing expense. (a) This classification includes the... exchange operation. (1) Effective July 1, 2001 through June 30, 2011, study areas subject to price cap...
ERIC Educational Resources Information Center
West, Alfred W.
This is the first in a series of documents developed by the National Training and Operational Technology Center describing operational control procedures for the activated sludge process used in wastewater treatment. Part I of this document deals with physical observations which should be performed during each routine control test. Part II…
9 CFR 318.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2013 CFR
2013-01-01
... factor over the specified thermal processing operation times. Temperature/time recording devices shall... minimum initial temperatures and operating procedures for thermal processing equipment, shall be posted in... available to the thermal processing system operator and the inspector. (b) Process indicators and retort...
9 CFR 318.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2012 CFR
2012-01-01
... factor over the specified thermal processing operation times. Temperature/time recording devices shall... minimum initial temperatures and operating procedures for thermal processing equipment, shall be posted in... available to the thermal processing system operator and the inspector. (b) Process indicators and retort...
9 CFR 318.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2014 CFR
2014-01-01
... factor over the specified thermal processing operation times. Temperature/time recording devices shall... minimum initial temperatures and operating procedures for thermal processing equipment, shall be posted in... available to the thermal processing system operator and the inspector. (b) Process indicators and retort...
9 CFR 318.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2011 CFR
2011-01-01
... factor over the specified thermal processing operation times. Temperature/time recording devices shall... minimum initial temperatures and operating procedures for thermal processing equipment, shall be posted in... available to the thermal processing system operator and the inspector. (b) Process indicators and retort...
ERIC Educational Resources Information Center
Deal, Gerald A.; Montgomery, James A.
This guide describes standard operating job procedures for the screening and grinding process of wastewater treatment facilities. The objective of this process is the removal of coarse materials from the raw waste stream for the protection of subsequent equipment and processes. The guide gives step-by-step instructions for safety inspection,…
ERIC Educational Resources Information Center
Schwing, Carl M.
This guide describes standard operating job procedures for the screening and grinding process of wastewater treatment facilities. The objective of this process is the removal of coarse materials from the raw waste stream for the protection of subsequent equipment and processes. The guide gives step-by-step instructions for safety inspection,…
ERIC Educational Resources Information Center
Charles County Community Coll., La Plata, MD.
This guide describes standard operating job procedures for the primary sedimentation process of wastewater treatment plants. The primary sedimentation process involves removing settleable and suspended solids, in part, from wastewater by gravitational forces, and scum and other floatable solids from wastewater by mechanical means. Step-by-step…
40 CFR 63.11980 - What are the test methods and calculation procedures for process wastewater?
Code of Federal Regulations, 2013 CFR
2013-07-01
... calculation procedures for process wastewater? 63.11980 Section 63.11980 Protection of Environment... § 63.11980 What are the test methods and calculation procedures for process wastewater? (a) Performance... performance tests during worst-case operating conditions for the PVCPU when the process wastewater treatment...
40 CFR 63.11980 - What are the test methods and calculation procedures for process wastewater?
Code of Federal Regulations, 2012 CFR
2012-07-01
... calculation procedures for process wastewater? 63.11980 Section 63.11980 Protection of Environment... § 63.11980 What are the test methods and calculation procedures for process wastewater? (a) Performance... performance tests during worst-case operating conditions for the PVCPU when the process wastewater treatment...
40 CFR 63.11980 - What are the test methods and calculation procedures for process wastewater?
Code of Federal Regulations, 2014 CFR
2014-07-01
... calculation procedures for process wastewater? 63.11980 Section 63.11980 Protection of Environment... § 63.11980 What are the test methods and calculation procedures for process wastewater? (a) Performance... performance tests during worst-case operating conditions for the PVCPU when the process wastewater treatment...
23 CFR 630.1008 - State-level processes and procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 630.1008 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1008 State-level processes and... sustain their respective work zone safety and mobility policies. State-level processes and procedures...
23 CFR 630.1008 - State-level processes and procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 630.1008 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1008 State-level processes and... sustain their respective work zone safety and mobility policies. State-level processes and procedures...
23 CFR 630.1008 - State-level processes and procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 630.1008 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1008 State-level processes and... sustain their respective work zone safety and mobility policies. State-level processes and procedures...
ERIC Educational Resources Information Center
Mason, George J.
This guide for developing standard operating job procedures for wastewater treatment facilities is devoted to the activated sludge aeration and sedimentation process. This process is for conversion of nonsettleable and nonfloatable materials in wastewater to settleable, floculated biological groups and separation of the settleable solids from the…
Ausserhofer, Dietmar; Rakic, Severin; Novo, Ahmed; Dropic, Emira; Fisekovic, Eldin; Sredic, Ana; Van Malderen, Greet
2016-06-01
We explored how selected 'positive deviant' healthcare facilities in Bosnia and Herzegovina approach the continuous development, adaptation, implementation, monitoring and evaluation of nursing-related standard operating procedures. Standardized nursing care is internationally recognized as a critical element of safe, high-quality health care; yet very little research has examined one of its key instruments: nursing-related standard operating procedures. Despite variability in Bosnia and Herzegovina's healthcare and nursing care quality, we assumed that some healthcare facilities would have developed effective strategies to elevate nursing quality and safety through the use of standard operating procedures. Guided by the 'positive deviance' approach, we used a multiple-case study design to examine a criterion sample of four facilities (two primary healthcare centres and two hospitals), collecting data via focus groups and individual interviews. In each studied facility, certification/accreditation processes were crucial to the initiation of continuous development, adaptation, implementation, monitoring and evaluation of nursing-related SOPs. In one hospital and one primary healthcare centre, nurses working in advanced roles (i.e. quality coordinators) were responsible for developing and implementing nursing-related standard operating procedures. Across the four studied institutions, we identified a consistent approach to standard operating procedures-related processes. The certification/accreditation process is enabling necessary changes in institutions' organizational cultures, empowering nurses to take on advanced roles in improving the safety and quality of nursing care. Standardizing nursing procedures is key to improve the safety and quality of nursing care. Nursing and Health Policy are needed in Bosnia and Herzegovina to establish a functioning institutional framework, including regulatory bodies, educational systems for developing nurses' capacities or the inclusion of nursing-related standard operating procedures in certification/accreditation standards. © 2016 International Council of Nurses.
On the design of flight-deck procedures
NASA Technical Reports Server (NTRS)
Degani, Asaf; Wiener, Earl L.
1994-01-01
In complex human-machine systems, operations, training, and standardization depend on a elaborate set of procedures which are specified and mandated by the operational management of the organization. The intent is to provide guidance to the pilots, to ensure a logical, efficient, safe, and predictable means of carrying out the mission objectives. In this report the authors examine the issue of procedure use and design from a broad viewpoint. The authors recommend a process which we call 'The Four P's:' philosophy, policies, procedures, and practices. We believe that if an organization commits to this process, it can create a set of procedures that are more internally consistent, less confusing, better respected by the flight crews, and that will lead to greater conformity. The 'Four-P' model, and the guidelines for procedural development in appendix 1, resulted from cockpit observations, extensive interviews with airline management and pilots, interviews and discussion at one major airframe manufacturer, and an examination of accident and incident reports. Although this report is based on airline operations, we believe that the principles may be applicable to other complex, high-risk systems, such as nuclear power production, manufacturing process control, space flight, and military operations.
ERIC Educational Resources Information Center
Schwing, Carl M.
This guide describes standard operating job procedures for the sludge conditioning and dewatering process of wastewater treatment facilities. In this process, sludge is treated with chemicals to make the sludge coagulate and give up its water more easily. The treated sludge is then dewatered using a vacuum filter. The guide gives step-by-step…
The procedure execution manager and its application to Advanced Photon Source operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Borland, M.
1997-06-01
The Procedure Execution Manager (PEM) combines a complete scripting environment for coding accelerator operation procedures with a manager application for executing and monitoring the procedures. PEM is based on Tcl/Tk, a supporting widget library, and the dp-tcl extension for distributed processing. The scripting environment provides support for distributed, parallel execution of procedures along with join and abort operations. Nesting of procedures is supported, permitting the same code to run as a top-level procedure under operator control or as a subroutine under control of another procedure. The manager application allows an operator to execute one or more procedures in automatic, semi-automatic,more » or manual modes. It also provides a standard way for operators to interact with procedures. A number of successful applications of PEM to accelerator operations have been made to date. These include start-up, shutdown, and other control of the positron accumulator ring (PAR), low-energy transport (LET) lines, and the booster rf systems. The PAR/LET procedures make nested use of PEM`s ability to run parallel procedures. There are also a number of procedures to guide and assist tune-up operations, to make accelerator physics measurements, and to diagnose equipment. Because of the success of the existing procedures, expanded use of PEM is planned.« less
Increasingly automated procedure acquisition in dynamic systems
NASA Technical Reports Server (NTRS)
Mathe, Nathalie; Kedar, Smadar
1992-01-01
Procedures are widely used by operators for controlling complex dynamic systems. Currently, most development of such procedures is done manually, consuming a large amount of paper, time, and manpower in the process. While automated knowledge acquisition is an active field of research, not much attention has been paid to the problem of computer-assisted acquisition and refinement of complex procedures for dynamic systems. The Procedure Acquisition for Reactive Control Assistant (PARC), which is designed to assist users in more systematically and automatically encoding and refining complex procedures. PARC is able to elicit knowledge interactively from the user during operation of the dynamic system. We categorize procedure refinement into two stages: diagnosis - diagnose the failure and choose a repair - and repair - plan and perform the repair. The basic approach taken in PARC is to assist the user in all steps of this process by providing increased levels of assistance with layered tools. We illustrate the operation of PARC in refining procedures for the control of a robot arm.
21 CFR 820.70 - Production and process controls.
Code of Federal Regulations, 2011 CFR
2011-04-01
... process control procedures that describe any process controls necessary to ensure conformance to specifications. Where process controls are needed they shall include: (1) Documented instructions, standard operating procedures (SOP's), and methods that define and control the manner of production; (2) Monitoring...
21 CFR 820.70 - Production and process controls.
Code of Federal Regulations, 2013 CFR
2013-04-01
... process control procedures that describe any process controls necessary to ensure conformance to specifications. Where process controls are needed they shall include: (1) Documented instructions, standard operating procedures (SOP's), and methods that define and control the manner of production; (2) Monitoring...
21 CFR 111.103 - What are the requirements under this subpart F for written procedures?
Code of Federal Regulations, 2010 CFR
2010-04-01
... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Production and Process Control... quality control operations, including written procedures for conducting a material review and making a...
Operant Variability: Procedures and Processes
ERIC Educational Resources Information Center
Machado, Armando; Tonneau, Francois
2012-01-01
Barba's (2012) article deftly weaves three main themes in one argument about operant variability. From general theoretical considerations on operant behavior (Catania, 1973), Barba derives methodological guidelines about response differentiation and applies them to the study of operant variability. In the process, he uncovers unnoticed features of…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-06
...] Center for Devices and Radiological Health; Standard Operating Procedures for Network of Experts; Request... procedures (SOPs) for a new ``Network of Experts.'' The draft SOPs describe a new process for staff at the... FDA is announcing the availability of two draft SOPs, one entitled, ``Network of Experts--Expert...
Code of Federal Regulations, 2014 CFR
2014-07-01
... permit limit applicable to the process vent. (iv) Design analysis based on accepted chemical engineering... rates, halogenated process vent determinations, process vent TRE index values, and engineering... corrected to 2.3 percent moisture; or (2) The engineering assessment procedures in paragraph (k) of this...
Code of Federal Regulations, 2013 CFR
2013-07-01
... permit limit applicable to the process vent. (iv) Design analysis based on accepted chemical engineering... rates, halogenated process vent determinations, process vent TRE index values, and engineering... corrected to 2.3 percent moisture; or (2) The engineering assessment procedures in paragraph (k) of this...
Code of Federal Regulations, 2011 CFR
2011-07-01
... permit limit applicable to the process vent. (iv) Design analysis based on accepted chemical engineering... rates, halogenated process vent determinations, process vent TRE index values, and engineering... corrected to 2.3 percent moisture; or (2) The engineering assessment procedures in paragraph (k) of this...
Code of Federal Regulations, 2012 CFR
2012-07-01
... permit limit applicable to the process vent. (iv) Design analysis based on accepted chemical engineering... rates, halogenated process vent determinations, process vent TRE index values, and engineering... corrected to 2.3 percent moisture; or (2) The engineering assessment procedures in paragraph (k) of this...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
Harding, Keith; Benson, Erica E
2015-01-01
Standard operating procedures are a systematic way of making sure that biopreservation processes, tasks, protocols, and operations are correctly and consistently performed. They are the basic documents of biorepository quality management systems and are used in quality assurance, control, and improvement. Methodologies for constructing workflows and writing standard operating procedures and work instructions are described using a plant cryopreservation protocol as an example. This chapter is pertinent to other biopreservation sectors because how methods are written, interpreted, and implemented can affect the quality of storage outcomes.
Tuck, Melissa K; Chan, Daniel W; Chia, David; Godwin, Andrew K; Grizzle, William E; Krueger, Karl E; Rom, William; Sanda, Martin; Sorbara, Lynn; Stass, Sanford; Wang, Wendy; Brenner, Dean E
2009-01-01
Specimen collection is an integral component of clinical research. Specimens from subjects with various stages of cancers or other conditions, as well as those without disease, are critical tools in the hunt for biomarkers, predictors, or tests that will detect serious diseases earlier or more readily than currently possible. Analytic methodologies evolve quickly. Access to high-quality specimens, collected and handled in standardized ways that minimize potential bias or confounding factors, is key to the "bench to bedside" aim of translational research. It is essential that standard operating procedures, "the how" of creating the repositories, be defined prospectively when designing clinical trials. Small differences in the processing or handling of a specimen can have dramatic effects in analytical reliability and reproducibility, especially when multiplex methods are used. A representative working group, Standard Operating Procedures Internal Working Group (SOPIWG), comprised of members from across Early Detection Research Network (EDRN) was formed to develop standard operating procedures (SOPs) for various types of specimens collected and managed for our biomarker discovery and validation work. This report presents our consensus on SOPs for the collection, processing, handling, and storage of serum and plasma for biomarker discovery and validation.
40 CFR 240.208-3 - Recommended procedures: Operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Recommended procedures: Operations. 240.208-3 Section 240.208-3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended...
40 CFR 240.210-3 - Recommended procedures: Operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Recommended procedures: Operations. 240.210-3 Section 240.210-3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended...
40 CFR 240.202-3 - Recommended procedures: Operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Recommended procedures: Operations. 240.202-3 Section 240.202-3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended...
40 CFR 240.203-3 - Recommended procedures: Operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Recommended procedures: Operations. 240.203-3 Section 240.203-3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended...
Mathijssen, N M C; Sturm, P D; Pilot, P; Bloem, R M; Buma, P; Petit, P L; Schreurs, B W
2013-12-01
With bone impaction grafting, cancellous bone chips made from allograft femoral heads are impacted in a bone defect, which introduces an additional source of infection. The potential benefit of the use of pre-processed bone chips was investigated by comparing the bacterial contamination of bone chips prepared intraoperatively with the bacterial contamination of pre-processed bone chips at different stages in the surgical procedure. To investigate baseline contamination of the bone grafts, specimens were collected during 88 procedures before actual use or preparation of the bone chips: in 44 procedures intraoperatively prepared chips were used (Group A) and in the other 44 procedures pre-processed bone chips were used (Group B). In 64 of these procedures (32 using locally prepared bone chips and 32 using pre-processed bone chips) specimens were also collected later in the procedure to investigate contamination after use and preparation of the bone chips. In total, 8 procedures had one or more positive specimen(s) (12.5 %). Contamination rates were not significantly different between bone chips prepared at the operating theatre and pre-processed bone chips. In conclusion, there was no difference in bacterial contamination between bone chips prepared from whole femoral heads in the operating room and pre-processed bone chips, and therefore, both types of bone allografts are comparable with respect to risk of infection.
Code of Federal Regulations, 2010 CFR
2010-04-01
... receive due process in disciplinary actions? 670.545 Section 670.545 Employees' Benefits EMPLOYMENT AND... process in disciplinary actions? The center operator must ensure that all students receive due process in disciplinary proceedings according to procedures developed by the Secretary. These procedures must include, at...
Procedures in complex systems: the airline cockpit.
Degani, A; Wiener, E L
1997-05-01
In complex human-machine systems, successful operations depend on an elaborate set of procedures which are specified by the operational management of the organization. These procedures indicate to the human operator (in this case the pilot) the manner in which operational management intends to have various tasks done. The intent is to provide guidance to the pilots and to ensure a safe, logical, efficient, and predictable (standardized) means of carrying out the objectives of the job. However, procedures can become a hodge-podge. Inconsistent or illogical procedures may lead to noncompliance by operators. Based on a field study with three major airlines, the authors propose a model for procedure development called the "Four P's": philosophy, policies, procedures, and practices. Using this model as a framework, the authors discuss the intricate issue of designing flight-deck procedures, and propose a conceptual approach for designing any set of procedures. The various factors, both external and internal to the cockpit, that must be considered for procedure design are presented. In particular, the paper addresses the development of procedures for automated cockpits--a decade-long, and highly controversial issue in commercial aviation. Although this paper is based on airline operations, we assume that the principles discussed here are also applicable to other high-risk supervisory control systems, such as space flight, manufacturing process control, nuclear power production, and military operations.
Process for testing a xenon gas feed system of a hollow cathode assembly
NASA Technical Reports Server (NTRS)
Patterson, Michael J. (Inventor); Verhey, Timothy R. R. (Inventor); Soulas, George C. (Inventor)
2004-01-01
The design and manufacturing processes for Hollow Cathode Assemblies (HCA's) that operate over a broad range of emission currents up to 30 Amperes, at low potentials, with lifetimes in excess of 17,500 hours. The processes include contamination control procedures which cover hollow cathode component cleaning procedures, gas feed system designs and specifications, and hollow cathode activation and operating procedures to thereby produce cathode assemblies that have demonstrated stable and repeatable operating conditions, for both the discharge current and voltage. The HCA of this invention provides lifetimes of greater than 10,000 hours, and expected lifetimes of greater than 17,500 hours, whereas the present state-of-the-art is less than 500 hours at emission currents in excess of 1 Ampere. Stable operation is provided over a large range of operating emission currents, up to a 6:1 ratio, and this HCA can emit electron currents of up to 30 Amperes in magnitude to an external anode that simulates the current drawn to a space plasma, at voltages of less than 20 Volts.
Process for Ignition of Gaseous Electrical Discharge Between Electrodes of a Hollow Cathode Assembly
NASA Technical Reports Server (NTRS)
Patterson, Michael J. (Inventor); Verhey, Timothy R. R. (Inventor); Soulas, George C. (Inventor)
2000-01-01
The design and manufacturing processes for Hollow Cathode Assemblies (HCA's) that operate over a broad range of emission currents up to 30 Amperes, at low potentials, with lifetimes in excess of 17,500 hours. The processes include contamination control procedures which cover hollow cathode component cleaning procedures, gas feed system designs and specifications, and hollow cathode activation and operating procedures to thereby produce cathode assemblies that have demonstrated stable and repeatable operating conditions, for both the discharge current and voltage. The HCA of this invention provides lifetimes of greater than 10,000 hours, and expected lifetimes of greater than 17,500 hours, whereas the present state-of-the-art is less than 500 hours at emission currents in excess of 1 Ampere. Stable operation is provided over a large range of operating emission currents, up to a 6:1 ratio, and this HCA can emit electron currents of up to 30 Amperes in magnitude to an external anode that simulates the current drawn to a space plasma, at voltages of less than 20 Volts.
Naval Personnel Can Improve Compliance With the Berry Amendment and the Buy American Act
2015-08-12
Amendment. Introduction 2 │ DODIG-2015-161 • FSG 83—textiles, leather and furs,6 apparel , and shoes; • FSG 84— clothing , individual equipment and insignia...personnel amended standard operating procedures and internal processes to improve compliance with the Berry Amendment. NAWCAD-Lakehurst personnel...corrective action and amended standard operating procedures and internal processes to improve compliance with the Buy American Act. Additionally, NAWCAD
The purpose of this SOP is to describe the operation of the data processing program. These methods were used for every execution of the data processing program during the Arizona NHEXAS project and the "Border" study. Keywords: data; data processing.
The National Human Exposur...
Verbal autopsy: current practices and challenges.
Soleman, Nadia; Chandramohan, Daniel; Shibuya, Kenji
2006-01-01
Cause-of-death data derived from verbal autopsy (VA) are increasingly used for health planning, priority setting, monitoring and evaluation in countries with incomplete or no vital registration systems. In some regions of the world it is the only method available to obtain estimates on the distribution of causes of death. Currently, the VA method is routinely used at over 35 sites, mainly in Africa and Asia. In this paper, we present an overview of the VA process and the results of a review of VA tools and operating procedures used at demographic surveillance sites and sample vital registration systems. We asked for information from 36 field sites about field-operating procedures and reviewed 18 verbal autopsy questionnaires and 10 cause-of-death lists used in 13 countries. The format and content of VA questionnaires, field-operating procedures, cause-of-death lists and the procedures to derive causes of death from VA process varied substantially among sites. We discuss the consequences of using varied methods and conclude that the VA tools and procedures must be standardized and reliable in order to make accurate national and international comparisons of VA data. We also highlight further steps needed in the development of a standard VA process. PMID:16583084
Code of Federal Regulations, 2011 CFR
2011-07-01
... current process operating conditions. (iii) Design analysis based on accepted chemical engineering... quantity are production records, measurement of stream characteristics, and engineering calculations. (5...-end process operations using engineering assessment. Engineering assessment includes, but is not...
Code of Federal Regulations, 2013 CFR
2013-07-01
... current process operating conditions. (iii) Design analysis based on accepted chemical engineering... quantity are production records, measurement of stream characteristics, and engineering calculations. (5...-end process operations using engineering assessment. Engineering assessment includes, but is not...
Code of Federal Regulations, 2014 CFR
2014-07-01
... current process operating conditions. (iii) Design analysis based on accepted chemical engineering... quantity are production records, measurement of stream characteristics, and engineering calculations. (5...-end process operations using engineering assessment. Engineering assessment includes, but is not...
Code of Federal Regulations, 2012 CFR
2012-07-01
... current process operating conditions. (iii) Design analysis based on accepted chemical engineering... quantity are production records, measurement of stream characteristics, and engineering calculations. (5...-end process operations using engineering assessment. Engineering assessment includes, but is not...
Blom, E M; Verdaasdonk, E G G; Stassen, L P S; Stassen, H G; Wieringa, P A; Dankelman, J
2007-09-01
Verbal communication in the operating room during surgical procedures affects team performance, reflects individual skills, and is related to the complexity of the operation process. During the procedural training of surgeons (residents), feedback and guidance is given through verbal communication. A classification method based on structural analysis of the contents was developed to analyze verbal communication. This study aimed to evaluate whether a classification method for the contents of verbal communication in the operating room could provide insight into the teaching processes. Eight laparoscopic cholecystectomies were videotaped. Two entire cholecystectomies and the dissection phase of six additional procedures were analyzed by categorization of the communication in terms of type (4 categories: commanding, explaining, questioning, and miscellaneous) and content (9 categories: operation method, location, direction, instrument handling, visualization, anatomy and pathology, general, private, undefinable). The operation was divided into six phases: start, dissection, clipping, separating, control, closing. Classification of the communication during two entire procedures showed that each phase of the operation was dominated by different kinds of communication. A high percentage of explaining anatomy and pathology was found throughout the whole procedure except for the control and closing phases. In the dissection phases, 60% of verbal communication concerned explaining. These explaining communication events were divided as follows: 27% operation method, 19% anatomy and pathology, 25% location (positioning of the instrument-tissue interaction), 15% direction (direction of tissue manipulation), 11% instrument handling, and 3% other nonclassified instructions. The proposed classification method is feasible for analyzing verbal communication during surgical procedures. Communication content objectively reflects the interaction between surgeon and resident. This information can potentially be used to specify training needs, and may contribute to the evaluation of different training methods.
40 CFR 63.145 - Process wastewater provisions-test methods and procedures to determine compliance.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Process wastewater provisions-test... Operations, and Wastewater § 63.145 Process wastewater provisions—test methods and procedures to determine... analytical method for wastewater which has that compound as a target analyte. (7) Treatment using a series of...
40 CFR 63.145 - Process wastewater provisions-test methods and procedures to determine compliance.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Process wastewater provisions-test... Operations, and Wastewater § 63.145 Process wastewater provisions—test methods and procedures to determine... analytical method for wastewater which has that compound as a target analyte. (7) Treatment using a series of...
The purpose of this SOP is to describe the operation of the data processing program. These methods were used for every execution of the data processing program during the Arizona NHEXAS project and the Border study. Keywords: data; data processing.
The U.S.-Mexico Border Progr...
The purpose of this SOP is to define the procedure to provide a standard method for correcting electronic data errors. The procedure defines (1) when electronic data may be corrected and by whom, (2) the process of correcting the data, and (3) the process of documenting the corr...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Błaszak, Maciej, E-mail: blaszakm@amu.edu.pl; Domański, Ziemowit, E-mail: ziemowit@amu.edu.pl
In the paper is presented an invariant quantization procedure of classical mechanics on the phase space over flat configuration space. Then, the passage to an operator representation of quantum mechanics in a Hilbert space over configuration space is derived. An explicit form of position and momentum operators as well as their appropriate ordering in arbitrary curvilinear coordinates is demonstrated. Finally, the extension of presented formalism onto non-flat case and related ambiguities of the process of quantization are discussed. -- Highlights: •An invariant quantization procedure of classical mechanics on the phase space over flat configuration space is presented. •The passage tomore » an operator representation of quantum mechanics in a Hilbert space over configuration space is derived. •Explicit form of position and momentum operators and their appropriate ordering in curvilinear coordinates is shown. •The invariant form of Hamiltonian operators quadratic and cubic in momenta is derived. •The extension of presented formalism onto non-flat case and related ambiguities of the quantization process are discussed.« less
7 CFR 58.723 - Basis for selecting cheese for processing.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 3 2011-01-01 2011-01-01 false Basis for selecting cheese for processing. 58.723... Service 1 Operations and Operating Procedures § 58.723 Basis for selecting cheese for processing. A... vat of cheese shall have been examined to determine the suitability of the vat for use in process...
7 CFR 58.723 - Basis for selecting cheese for processing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 3 2010-01-01 2010-01-01 false Basis for selecting cheese for processing. 58.723... Service 1 Operations and Operating Procedures § 58.723 Basis for selecting cheese for processing. A... vat of cheese shall have been examined to determine the suitability of the vat for use in process...
Code of Federal Regulations, 2010 CFR
2010-10-01
... cause contamination of foods by oil, dust, paint, scale, fumes, grinding materials, decomposed food... partially processed food ingredients shall not be stacked in such manner as to permit contamination of the... PROCESSED FISHERY PRODUCTS, PROCESSED PRODUCTS THEREOF, AND CERTAIN OTHER PROCESSED FOOD PRODUCTS INSPECTION...
NASA Technical Reports Server (NTRS)
Randall, Roger M.
1987-01-01
Orbit Transfer Vehicle (OTV) processing at the space station is divided into two major categories: OTV processing and assembly operations, and support operations. These categories are further subdivided into major functional areas to allow development of detailed OTV processing procedures and timelines. These procedures and timelines are used to derive the specific space station accommodations necessary to support OTV activities. The overall objective is to limit impact on OTV processing requirements on space station operations, involvement of crew, and associated crew training and skill requirements. The operational concept maximizes use of automated and robotic systems to perform all required OTV servicing and maintenance tasks. Only potentially critical activities would require direct crew involvement or supervision. EVA operations are considered to be strictly contingency back-up to failure of the automated and robotic systems, with the exception of the initial assembly of Space-Based OTV accommodations at the space station, which will require manned involvement.
Apollo experience report: Systems and flight procedures development
NASA Technical Reports Server (NTRS)
Kramer, P. C.
1973-01-01
This report describes the process of crew procedures development used in the Apollo Program. The two major categories, Systems Procedures and Flight Procedures, are defined, as are the forms of documentation required. A description is provided of the operation of the procedures change control process, which includes the roles of man-in-the-loop simulations and the Crew Procedures Change Board. Brief discussions of significant aspects of the attitude control, computer, electrical power, environmental control, and propulsion subsystems procedures development are presented. Flight procedures are subdivided by mission phase: launch and translunar injection, rendezvous, lunar descent and ascent, and entry. Procedures used for each mission phase are summarized.
10 CFR 451.9 - Procedures for processing applications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... or operators of qualified renewable energy facilities using solar, wind, ocean, geothermal, and... 10 Energy 3 2010-01-01 2010-01-01 false Procedures for processing applications. 451.9 Section 451.9 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION RENEWABLE ENERGY PRODUCTION INCENTIVES § 451.9...
Supporting Studies on QDRI Project Plan. Report No. 2. Conversion Procedures for Automation.
ERIC Educational Resources Information Center
Peirce, James G.; And Others
This report describes the tasks and related efforts necessary to convert the present Qualitative Developments Requirements Information (QDRI) Program from a clerical operation into an automated information processing system. A description of the QDRI Program is presented whereby current operations, files, procedures, etc. are contrasted to planned…
Report of the Shuttle Processing Review Team
NASA Technical Reports Server (NTRS)
1993-01-01
The intent of this report is to summarize the assessment of the shuttle processing operations at the Kennedy Space Center (KSC) as requested by the NASA Administrator. He requested a team reaffirmation that safety is the number one priority and review operations to ensure confidence in the shuttle processing procedures at KSC.
NASA Astrophysics Data System (ADS)
Schmitt, Kara Anne
This research aims to prove that strict adherence to procedures and rigid compliance to process in the US Nuclear Industry may not prevent incidents or increase safety. According to the Institute of Nuclear Power Operations, the nuclear power industry has seen a recent rise in events, and this research claims that a contributing factor to this rise is organizational, cultural, and based on peoples overreliance on procedures and policy. Understanding the proper balance of function allocation, automation and human decision-making is imperative to creating a nuclear power plant that is safe, efficient, and reliable. This research claims that new generations of operators are less engaged and thinking because they have been instructed to follow procedures to a fault. According to operators, they were once to know the plant and its interrelations, but organizationally more importance is now put on following procedure and policy. Literature reviews were performed, experts were questioned, and a model for context analysis was developed. The Context Analysis Method for Identifying Design Solutions (CAMIDS) Model was created, verified and validated through both peer review and application in real world scenarios in active nuclear power plant simulators. These experiments supported the claim that strict adherence and rigid compliance to procedures may not increase safety by studying the industry's propensity for following incorrect procedures, and when it directly affects the outcome of safety or security of the plant. The findings of this research indicate that the younger generations of operators rely highly on procedures, and the organizational pressures of required compliance to procedures may lead to incidents within the plant because operators feel pressured into following the rules and policy above performing the correct actions in a timely manner. The findings support computer based procedures, efficient alarm systems, and skill of the craft matrices. The solution to the problems facing the industry include in-depth, multiple fault failure training which tests the operator's knowledge of the situation. This builds operator collaboration, competence and confidence to know what to do, and when to do it in response to an emergency situation. Strict adherence to procedures and rigid compliance to process may not prevent incidents or increase safety; building operators' fundamental skills of collaboration, competence and confidence will.
40 CFR 264.1034 - Test methods and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Test methods and procedures. 264.1034... Air Emission Standards for Process Vents § 264.1034 Test methods and procedures. (a) Each owner or operator subject to the provisions of this subpart shall comply with the test methods and procedures...
Environmental Risk Assessment of dredging processes - application to Marin harbour (NW Spain)
NASA Astrophysics Data System (ADS)
Gómez, A. G.; García Alba, J.; Puente, A.; Juanes, J. A.
2014-04-01
A methodological procedure to estimate the environmental risk of dredging operations in aquatic systems has been developed. Environmental risk estimations are based on numerical models results, which provide an appropriated spatio-temporal framework analysis to guarantee an effective decision-making process. The methodological procedure has been applied on a real dredging operation in the port of Marin (NW Spain). Results from Marin harbour confirmed the suitability of the developed methodology and the conceptual approaches as a comprehensive and practical management tool.
Kirkwood, Melissa L; Guild, Jeffrey B; Arbique, Gary M; Tsai, Shirling; Modrall, J Gregory; Anderson, Jon A; Rectenwald, John; Timaran, Carlos
2016-11-01
A new proprietary image-processing system known as AlluraClarity, developed by Philips Healthcare (Best, The Netherlands) for radiation-based interventional procedures, claims to lower radiation dose while preserving image quality using noise-reduction algorithms. This study determined whether the surgeon and patient radiation dose during complex endovascular procedures (CEPs) is decreased after the implementation of this new operating system. Radiation dose to operators, procedure type, reference air kerma, kerma area product, and patient body mass index were recorded during CEPs on two Philips Allura FD 20 fluoroscopy systems with and without Clarity. Operator dose during CEPs was measured using optically stimulable, luminescent nanoDot (Landauer Inc, Glenwood, Ill) detectors placed outside the lead apron at the left upper chest position. nanoDots were read using a microStar ii (Landauer Inc) medical dosimetry system. For the CEPs in the Clarity group, the radiation dose to surgeons was also measured by the DoseAware (Philips Healthcare) personal dosimetry system. Side-by-side measurements of DoseAware and nanoDots allowed for cross-calibration between systems. Operator effective dose was determined using a modified Niklason algorithm. To control for patient size and case complexity, the average fluoroscopy dose rate and the dose per radiographic frame were adjusted for body mass index differences and then compared between the groups with and without Clarity by procedure. Additional factors, for example, physician practice patterns, that may have affected operator dose were inferred by comparing the ratio of the operator dose to procedural kerma area product with and without Clarity. A one-sided Wilcoxon rank sum test was used to compare groups for radiation doses, reference air kermas, and operating practices for each procedure type. The analysis included 234 CEPs; 95 performed without Clarity and 139 with Clarity. Practice patterns of operators during procedures with and without Clarity were not significantly different. For all cases, procedure radiation dose to the patient and the primary and assistant operators were significantly decreased in the Clarity group by 60% compared with the non-Clarity group. By procedure type, fluorography dose rates decreased from 44% for fenestrated endovascular repair and up to 70% with lower extremity interventions. Fluoroscopy dose rates also significantly decreased, from about 37% to 47%, depending on procedure type. The AlluraClarity system reduces the patient and primary operator's radiation dose by more than half during CEPs. This feature appears to be an effective tool in lowering the radiation dose while maintaining image quality. Copyright © 2016 Society for Vascular Surgery. Published by Elsevier Inc. All rights reserved.
The purpose of this SOP is to describe the assembly of household (HH) packets into data processing batches. The batching process enables orderly tracking of packets or forms through data processing and limits the potential for packet or form loss. This procedure was used for th...
The purpose of this SOP is to describe the assembly of household (HH) packets into data processing batches. The batching process enables orderly tracking of packets or forms through data processing and limits the potential for packet or form loss. This procedure was used for th...
Designing Flight-Deck Procedures
NASA Technical Reports Server (NTRS)
Degani, Asaf; Wiener, L.; Shafto, Mike (Technical Monitor)
1995-01-01
A complex human-machine system consists of more than merely one or more human operators and a collection of hardware components. In order to operate a complex system successfully, the human-machine system must be supported by an organizational infrastructure of operating concepts, rules, guidelines, and documents. The coherency of such operating concepts, in terms of consistency and logic, is vitally important for the efficiency and safety of any complex system. In high-risk endeavors such as aircraft operations, space flight, nuclear power production, manufacturing process control, and military operations, it is essential that such support be flawless, as the price of operational error can be high. When operating rules are not adhered to, or the rules are inadequate for the task at hand, not only will the system's goals be thwarted, but there may also be tragic human and material consequences. To ensure safe and predictable operations, support to the operators, in this case flight crews, often comes in the form of standard operating procedures. These provide the crew with step-by-step guidance for carrying out their operations. Standard procedures do indeed promote uniformity, but they do so at the risk of reducing the role of human operators to a lower level. Management, however, must recognize the danger of over-procedurization, which fails to exploit one of the most valuable assets in the system, the intelligent operator who is "on the scene." The alert system designer and operations manager recognize that there cannot be a procedure for everything, and the time will come in which the operators of a complex system will face a situation for which there is no written procedure. Procedures, whether executed by humans or machines, have their place, but so does human cognition.
How to develop a Standard Operating Procedure for sorting unfixed cells
Schmid, Ingrid
2012-01-01
Written Standard Operating Procedures (SOPs) are an important tool to assure that recurring tasks in a laboratory are performed in a consistent manner. When the procedure covered in the SOP involves a high-risk activity such as sorting unfixed cells using a jet-in-air sorter, safety elements are critical components of the document. The details on sort sample handling, sorter set-up, validation, operation, troubleshooting, and maintenance, personal protective equipment (PPE), and operator training, outlined in the SOP are to be based on careful risk assessment of the procedure. This review provides background information on the hazards associated with sorting of unfixed cells and the process used to arrive at the appropriate combination of facility design, instrument placement, safety equipment, and practices to be followed. PMID:22381383
Schenk, Michael; Huppertz, Berthold; Obermayer-Pietsch, Barbara; Kastelic, Darja; Hörmann-Kröpfl, Martina; Weiss, Gregor
2017-02-01
The aim of the present study was to develop a standard operating procedure (SOP) for the collection, transport, and storage of human cumulus cells, follicular fluid, blood serum, seminal plasma, embryo culture supernatant, and embryo culture supernatant control obtained within the IVF process under approved protocols and written informed consent from participating patients. The SOP was developed at the Kinderwunsch Institut Schenk, Dobl, Austria, together with Biobank Graz of the Medical University of Graz, Austria. The SOP provides comprehensive details of laboratory procedures and sampling of the different fluids within the IVF process. Furthermore, information on sample coding, references of involved laboratory techniques (e.g., oocyte retrieval with a Steiner-TAN needle), ethical approvals, and biobanking procedures are presented. The result of the present study is a standard operating procedure. The SOP ensures a professional way for collection and scientific use of IVF samples by the Kinderwunsch Institut Schenk, Dobl, Austria, and Biobank Graz of the Medical University of Graz, Austria. It can be used as a template for other institutions to unify specimen collection procedures in the field of reproductive health research.
NASA Technical Reports Server (NTRS)
Weaver, William L.; Bush, Kathryn A.; Harris, Chris J.; Howerton, Clayton E.; Tolson, Carol J.
1991-01-01
Instruments of the Earth Radiation Budget Experiment (ERBE) are operating on three different Earth orbiting spacecrafts: the Earth Radiation Budget Satellite (ERBS), NOAA-9, and NOAA-10. An overview is presented of the ERBE mission, in-orbit environments, and instrument design and operational features. An overview of science data processing and validation procedures is also presented. In-flight operations are described for the ERBE instruments aboard the ERBS and NOAA-9. Calibration and other operational procedures are described, and operational and instrument housekeeping data are presented and discussed.
40 CFR 60.675 - Test methods and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.675... Mineral Processing Plants § 60.675 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in...
40 CFR 60.644 - Test methods and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.644... Gas Processing: SO2 Emissions § 60.644 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test...
Locating underwater objects. [technology transfer
NASA Technical Reports Server (NTRS)
Grice, C. F.
1974-01-01
Underwater search operations are considered to be engineering and operational problems. A process for proper definition of the problem and selection of instrumentation and operational procedures is described. An outline of underwater search instrumentation and techniques is given.
NASA Technical Reports Server (NTRS)
Fayyad, Kristina E.; Hill, Randall W., Jr.; Wyatt, E. J.
1993-01-01
This paper presents a case study of the knowledge engineering process employed to support the Link Monitor and Control Operator Assistant (LMCOA). The LMCOA is a prototype system which automates the configuration, calibration, test, and operation (referred to as precalibration) of the communications, data processing, metric data, antenna, and other equipment used to support space-ground communications with deep space spacecraft in NASA's Deep Space Network (DSN). The primary knowledge base in the LMCOA is the Temporal Dependency Network (TDN), a directed graph which provides a procedural representation of the precalibration operation. The TDN incorporates precedence, temporal, and state constraints and uses several supporting knowledge bases and data bases. The paper provides a brief background on the DSN, and describes the evolution of the TDN and supporting knowledge bases, the process used for knowledge engineering, and an analysis of the successes and problems of the knowledge engineering effort.
NASA Astrophysics Data System (ADS)
Meyer, F. J.; McAlpin, D. B.; Gong, W.; Ajadi, O.; Arko, S.; Webley, P. W.; Dehn, J.
2015-02-01
Remote sensing plays a critical role in operational volcano monitoring due to the often remote locations of volcanic systems and the large spatial extent of potential eruption pre-cursor signals. Despite the all-weather capabilities of radar remote sensing and its high performance in monitoring of change, the contribution of radar data to operational monitoring activities has been limited in the past. This is largely due to: (1) the high costs associated with radar data; (2) traditionally slow data processing and delivery procedures; and (3) the limited temporal sampling provided by spaceborne radars. With this paper, we present new data processing and data integration techniques that mitigate some of these limitations and allow for a meaningful integration of radar data into operational volcano monitoring decision support systems. Specifically, we present fast data access procedures as well as new approaches to multi-track processing that improve near real-time data access and temporal sampling of volcanic systems with SAR data. We introduce phase-based (coherent) and amplitude-based (incoherent) change detection procedures that are able to extract dense time series of hazard information from these data. For a demonstration, we present an integration of our processing system with an operational volcano monitoring system that was developed for use by the Alaska Volcano Observatory (AVO). Through an application to a historic eruption, we show that the integration of SAR into systems such as AVO can significantly improve the ability of operational systems to detect eruptive precursors. Therefore, the developed technology is expected to improve operational hazard detection, alerting, and management capabilities.
NASA Astrophysics Data System (ADS)
Suryono, T. J.; Gofuku, A.
2018-02-01
One of the important thing in the mitigation of accidents in nuclear power plant accidents is time management. The accidents should be resolved as soon as possible in order to prevent the core melting and the release of radioactive material to the environment. In this case, operators should follow the emergency operating procedure related with the accident, in step by step order and in allowable time. Nowadays, the advanced main control rooms are equipped with computer-based procedures (CBPs) which is make it easier for operators to do their tasks of monitoring and controlling the reactor. However, most of the CBPs do not include the time remaining display feature which informs operators of time available for them to execute procedure steps and warns them if the they reach the time limit. Furthermore, the feature will increase the awareness of operators about their current situation in the procedure. This paper investigates this issue. The simplified of emergency operating procedure (EOP) of steam generator tube rupture (SGTR) accident of PWR plant is applied. In addition, the sequence of actions on each step of the procedure is modelled using multilevel flow modelling (MFM) and influenced propagation rule. The prediction of action time on each step is acquired based on similar case accidents and the Support Vector Regression. The derived time will be processed and then displayed on a CBP user interface.
Timeliner: Automating Procedures on the ISS
NASA Technical Reports Server (NTRS)
Brown, Robert; Braunstein, E.; Brunet, Rick; Grace, R.; Vu, T.; Zimpfer, Doug; Dwyer, William K.; Robinson, Emily
2002-01-01
Timeliner has been developed as a tool to automate procedural tasks. These tasks may be sequential tasks that would typically be performed by a human operator, or precisely ordered sequencing tasks that allow autonomous execution of a control process. The Timeliner system includes elements for compiling and executing sequences that are defined in the Timeliner language. The Timeliner language was specifically designed to allow easy definition of scripts that provide sequencing and control of complex systems. The execution environment provides real-time monitoring and control based on the commands and conditions defined in the Timeliner language. The Timeliner sequence control may be preprogrammed, compiled from Timeliner "scripts," or it may consist of real-time, interactive inputs from system operators. In general, the Timeliner system lowers the workload for mission or process control operations. In a mission environment, scripts can be used to automate spacecraft operations including autonomous or interactive vehicle control, performance of preflight and post-flight subsystem checkouts, or handling of failure detection and recovery. Timeliner may also be used for mission payload operations, such as stepping through pre-defined procedures of a scientific experiment.
How to develop a standard operating procedure for sorting unfixed cells.
Schmid, Ingrid
2012-07-01
Written standard operating procedures (SOPs) are an important tool to assure that recurring tasks in a laboratory are performed in a consistent manner. When the procedure covered in the SOP involves a high-risk activity such as sorting unfixed cells using a jet-in-air sorter, safety elements are critical components of the document. The details on sort sample handling, sorter set-up, validation, operation, troubleshooting, and maintenance, personal protective equipment (PPE), and operator training, outlined in the SOP are to be based on careful risk assessment of the procedure. This review provides background information on the hazards associated with sorting of unfixed cells and the process used to arrive at the appropriate combination of facility design, instrument placement, safety equipment, and practices to be followed. Copyright © 2012 Elsevier Inc. All rights reserved.
Johnson, Steven M.; Swanson, Robert B.
1994-01-01
Prototype stream-monitoring sites were operated during part of 1992 in the Central Nebraska Basins (CNBR) and three other study areas of the National Water-Quality Assessment (NAWQ) Program of the U.S. Geological Survey. Results from the prototype project provide information needed to operate a net- work of intensive fixed station stream-monitoring sites. This report evaluates operating procedures for two NAWQA prototype sites at Maple Creek near Nickerson and the Platte River at Louisville, eastern Nebraska. Each site was sampled intensively in the spring and late summer 1992, with less intensive sampling in midsummer. In addition, multiple samples were collected during two high- flow periods at the Maple Creek site--one early and the other late in the growing season. Water-samples analyses included determination of pesticides, nutrients, major ions, suspended sediment, and measurements of physical properties. Equipment and protocols for the water-quality sampling procedures were evaluated. Operation of the prototype stream- monitoring sites included development and comparison of onsite and laboratory sample-processing proce- dures. Onsite processing was labor intensive but allowed for immediate preservation of all sampled constituents. Laboratory processing required less field labor and decreased the risk of contamination, but allowed for no immediate preservation of the samples.
77 FR 48112 - Pipeline Safety: Administrative Procedures; Updates and Technical Corrections
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-13
...This Notice of Proposed Rulemaking updates the administrative civil penalty maximums for violation of the pipeline safety regulations to conform to current law, updates the informal hearing and adjudication process for pipeline enforcement matters to conform to current law, amends other administrative procedures used by PHMSA personnel, and makes other technical corrections and updates to certain administrative procedures. The proposed amendments do not impose any new operating, maintenance, or other substantive requirements on pipeline owners or operators.
Electronic Procedures for Medical Operations
NASA Technical Reports Server (NTRS)
2015-01-01
Electronic procedures are replacing text-based documents for recording the steps in performing medical operations aboard the International Space Station. S&K Aerospace, LLC, has developed a content-based electronic system-based on the Extensible Markup Language (XML) standard-that separates text from formatting standards and tags items contained in procedures so they can be recognized by other electronic systems. For example, to change a standard format, electronic procedures are changed in a single batch process, and the entire body of procedures will have the new format. Procedures can be quickly searched to determine which are affected by software and hardware changes. Similarly, procedures are easily shared with other electronic systems. The system also enables real-time data capture and automatic bookmarking of current procedure steps. In Phase II of the project, S&K Aerospace developed a Procedure Representation Language (PRL) and tools to support the creation and maintenance of electronic procedures for medical operations. The goal is to develop these tools in such a way that new advances can be inserted easily, leading to an eventual medical decision support system.
ARM Operations and Engineering Procedure Mobile Facility Site Startup
DOE Office of Scientific and Technical Information (OSTI.GOV)
Voyles, Jimmy W
2015-05-01
This procedure exists to define the key milestones, necessary steps, and process rules required to commission and operate an Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF), with a specific focus toward on-time product delivery to the ARM Data Archive. The overall objective is to have the physical infrastructure, networking and communications, and instrument calibration, grooming, and alignment (CG&A) completed with data products available from the ARM Data Archive by the Operational Start Date milestone.
EP-DRAFT-1.1 2014-01-19 OSI-GAM-SOP-00x In Situ High-resolution Gamma Spectroscopy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wimer, N. G.; Kreek, S. A.
2014-01-27
The standard operating procedure is described for in situ high-resolution gamma spectroscopy, including operational readiness, planning, preparation, conduct, and reporting. Data analysis of in situ gamma spectrum files will be performed together with those of other gamma assay methods by a dedicated Data Analysis process, documented in companion OSI procedures.
Morgan, Lauren; New, Steve; Robertson, Eleanor; Collins, Gary; Rivero-Arias, Oliver; Catchpole, Ken; Pickering, Sharon P; Hadi, Mohammed; Griffin, Damian; McCulloch, Peter
2015-02-01
Standard operating procedures (SOPs) should improve safety in the operating theatre, but controlled studies evaluating the effect of staff-led implementation are needed. In a controlled interrupted time series, we evaluated three team process measures (compliance with WHO surgical safety checklist, non-technical skills and technical performance) and three clinical outcome measures (length of hospital stay, complications and readmissions) before and after a 3-month staff-led development of SOPs. Process measures were evaluated by direct observation, using Oxford Non-Technical Skills II for non-technical skills and the 'glitch count' for technical performance. All staff in two orthopaedic operating theatres were trained in the principles of SOPs and then assisted to develop standardised procedures. Staff in a control operating theatre underwent the same observations but received no training. The change in difference between active and control groups was compared before and after the intervention using repeated measures analysis of variance. We observed 50 operations before and 55 after the intervention and analysed clinical data on 1022 and 861 operations, respectively. The staff chose to structure their efforts around revising the 'whiteboard' which documented and prompted tasks, rather than directly addressing specific task problems. Although staff preferred and sustained the new system, we found no significant differences in process or outcome measures before/after intervention in the active versus the control group. There was a secular trend towards worse outcomes in the postintervention period, seen in both active and control theatres. SOPs when developed and introduced by frontline staff do not necessarily improve operative processes or outcomes. The inherent tension in improvement work between giving staff ownership of improvement and maintaining control of direction needs to be managed, to ensure staff are engaged but invest energy in appropriate change. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
Operational Implementation of Space Debris Mitigation Procedures
NASA Astrophysics Data System (ADS)
Gicquel, Anne-Helene; Bonaventure, Francois
2013-08-01
During the spacecraft lifetime, Astrium supports its customers to manage collision risks alerts from the Joint Space Operations Center (JSpOC). This was previously done with hot-line support and a manual operational procedure. Today, it is automated and integrated in QUARTZ, the Astrium Flight Dynamics operational tool. The algorithms and process details for this new 5- step functionality are provided in this paper. To improve this functionality, some R&D activities such as the study of dilution phenomenon and low relative velocity encounters are going on. Regarding end of life disposal, recent operational experiences as well as studies results are presented.
Automating Space Station operations planning
NASA Technical Reports Server (NTRS)
Ziemer, Kathleen A.
1989-01-01
The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...
Laparoscopic repair of inguinal hernia in adults
Yang, Xue-Fei
2016-01-01
Laparoscopic repair of inguinal hernia is mini-invasive and has confirmed effects. The procedures include intraperitoneal onlay mesh (IPOM) repair, transabdominal preperitoneal (TAPP) repair and total extraperitoneal (TEP) repair. These procedures have totally different anatomic point of view, process and technical key points from open operations. The technical details of these operations are discussed in this article, also the strategies of treatment for some special conditions. PMID:27867954
Application and Validation of Workload Assessment Techniques
1993-03-01
tech ical report documents the process and outcome of meeting this objective. Procedure: A series of eight separate studies was conducted using three...development process . The task analysis and simulation technique was shown to have the capability to track empirical workload ratings. More research is...operator workload during the systems acquisi- tion process , and (b) a pamphlet for the managers of Army systems that describes the need and some procedures
Operational Improvements From the In-Trail Procedure in the North Atlantic Organized Track System
NASA Technical Reports Server (NTRS)
Chartrand, Ryan C.; Bussink, Frank J. L.; Graff, Thomas J.; Murdoch, Jennifer L.; Jones, Kenneth M.
2008-01-01
This paper explains the computerized batch processing experiment examining the operational impacts of the introduction of Automatic Dependent Surveillance-Broadcast (ADS-B) equipment and the In-Trail Procedure (ITP) to the North Atlantic Organized Track System (NATOTS). This experiment was conducted using the Traffic Manager (TMX), a desktop simulation capable of simulating airspace environments and aircraft operations. ADS-B equipment can enable the use of new ground and airborne procedures, such as the ITP. The ITP is among the first of these new procedures, which will make use of improved situation awareness in the local surrounding airspace of ADS-B equipped aircraft to enable more efficient oceanic flight level changes. The data collected were analyzed with respect to multiple operationally relevant parameters including fuel burn, request approval rates, and the distribution of fuel savings. This experiment showed that through the use of ADS-B or ADS-B and the ITP that operational improvements and benefits could be achieved.
NASA Technical Reports Server (NTRS)
Chartrand, Ryan C.; Bussink, Frank J.; Graff, Thomas J.; Jones, Kenneth M.
2009-01-01
This paper explains the computerized batch processing experiment examining the operational impacts of the introduction of Automatic Dependent Surveillance-Broadcast (ADS-B) equipment and the In-Trail Procedure (ITP) to the North Atlantic Organized Track System. This experiment was conducted using the Traffic Manager (TMX), a desktop simulation capable of simulating airspace environments and aircraft operations. ADS-B equipment can enable the use of new ground and airborne procedures, such as the ITP. ITP is among the first of these new procedures, which will make use of improved situation awareness in the local surrounding airspace of ADS-B equipped aircraft to enable more efficient oceanic flight level changes. The collected data were analyzed with respect to multiple operationally relevant parameters including fuel burn, request approval rates, and the distribution of fuel savings. This experiment showed that through the use of ADS-B or ADS-B and the ITP that operational improvements and benefits could be achieved.
40 CFR 63.9600 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... correspond to your standard operating procedures for maintaining the proper and efficient combustion within... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Taconite Iron Ore Processing Operation...
40 CFR 63.9600 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... correspond to your standard operating procedures for maintaining the proper and efficient combustion within... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Taconite Iron Ore Processing Operation...
40 CFR 63.9600 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... correspond to your standard operating procedures for maintaining the proper and efficient combustion within... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Taconite Iron Ore Processing Operation...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cai, H.
In this dissertation we study a procedure which restarts a Markov process when the process is killed by some arbitrary multiplicative functional. The regenerative nature of this revival procedure is characterized through a Markov renewal equation. An interesting duality between the revival procedure and the classical killing operation is found. Under the condition that the multiplicative functional possesses an intensity, the generators of the revival process can be written down explicitly. An intimate connection is also found between the perturbation of the sample path of a Markov process and the perturbation of a generator (in Kato's sense). The applications ofmore » the theory include the study of the processes like piecewise-deterministic Markov process, virtual waiting time process and the first entrance decomposition (taboo probability).« less
Method and system for controlling a gasification or partial oxidation process
Rozelle, Peter L; Der, Victor K
2015-02-10
A method and system for controlling a fuel gasification system includes optimizing a conversion of solid components in the fuel to gaseous fuel components, controlling the flux of solids entrained in the product gas through equipment downstream of the gasifier, and maximizing the overall efficiencies of processes utilizing gasification. A combination of models, when utilized together, can be integrated with existing plant control systems and operating procedures and employed to develop new control systems and operating procedures. Such an approach is further applicable to gasification systems that utilize both dry feed and slurry feed.
49 CFR 240.207 - Procedures for making the determination on vision and hearing acuity.
Code of Federal Regulations, 2014 CFR
2014-10-01
... writing that the person can safely operate without using the device. [56 FR 28254, June 19, 1991, as... 49 Transportation 4 2014-10-01 2014-10-01 false Procedures for making the determination on vision... CERTIFICATION OF LOCOMOTIVE ENGINEERS Implementation of the Certification Process § 240.207 Procedures for...
49 CFR 240.207 - Procedures for making the determination on vision and hearing acuity.
Code of Federal Regulations, 2012 CFR
2012-10-01
... writing that the person can safely operate without using the device. [56 FR 28254, June 19, 1991, as... 49 Transportation 4 2012-10-01 2012-10-01 false Procedures for making the determination on vision... CERTIFICATION OF LOCOMOTIVE ENGINEERS Implementation of the Certification Process § 240.207 Procedures for...
49 CFR 240.207 - Procedures for making the determination on vision and hearing acuity.
Code of Federal Regulations, 2013 CFR
2013-10-01
... writing that the person can safely operate without using the device. [56 FR 28254, June 19, 1991, as... 49 Transportation 4 2013-10-01 2013-10-01 false Procedures for making the determination on vision... CERTIFICATION OF LOCOMOTIVE ENGINEERS Implementation of the Certification Process § 240.207 Procedures for...
[Implementation of a rational standard of hygiene for preparation of operating rooms].
Bauer, M; Scheithauer, S; Moerer, O; Pütz, H; Sliwa, B; Schmidt, C E; Russo, S G; Waeschle, R M
2015-10-01
The assurance of high standards of care is a major requirement in German hospitals while cost reduction and efficient use of resources are mandatory. These requirements are particularly evident in the high-risk and cost-intensive operating theatre field with multiple process steps. The cleaning of operating rooms (OR) between surgical procedures is of major relevance for patient safety and requires time and human resources. The hygiene procedure plan for OR cleaning between operations at the university hospital in Göttingen was revised and optimized according to the plan-do-check-act principle due to not clearly defined specifications of responsibilities, use of resources, prolonged process times and increased staff engagement. The current status was evaluated in 2012 as part of the first step "plan". The subsequent step "do" included an expert symposium with external consultants, interdisciplinary consensus conferences with an actualization of the former hygiene procedure plan and the implementation process. All staff members involved were integrated into this management change process. The penetration rate of the training and information measures as well as the acceptance and compliance with the new hygiene procedure plan were reviewed within step "check". The rates of positive swabs and air sampling as well as of postoperative wound infections were analyzed for quality control and no evidence for a reduced effectiveness of the new hygiene plan was found. After the successful implementation of these measures the next improvement cycle ("act") was performed in 2014 which led to a simplification of the hygiene plan by reduction of the number of defined cleaning and disinfection programs for preparation of the OR. The reorganization measures described led to a comprehensive commitment of the hygiene procedure plan by distinct specifications for responsibilities, for the course of action and for the use of resources. Furthermore, a simplification of the plan, a rational staff assignment and reduced process times were accomplished. Finally, potential conflicts due to an insufficient evidence-based knowledge of personnel was reduced. This present project description can be used by other hospitals as a guideline for similar changes in management processes.
The changing face of informed surgical consent.
Oosthuizen, J C; Burns, P; Timon, C
2012-03-01
To determine whether procedure-specific brochures improve patients' pre-operative knowledge, to determine the amount of information expected by patients during the consenting process, and to determine whether the recently proposed 'Request for Treatment' consenting process is viable on a large scale. A prospective, questionnaire-based study of 100 patients admitted for selected, elective surgical procedures. In total, 99 per cent of patients were satisfied with the information received in the out-patient department, regarding the proposed procedure. However, 38 per cent were unable to correctly state the nature of the surgery or specific procedure they were scheduled to undergo. Although the vast majority of patients were able to state the intended benefits to be gained from the procedure, only 54 per cent were able to list at least one potential complication, and 80 per cent indicated that they wished to be informed about all potential complications, even if these occurred in less than 1 per cent of cases. The introduction of procedure-specific brochures improved patients' pre-operative knowledge. Although the failings of current consenting practice are clear, the Request for Treatment consenting process would not appear to be a viable alternative because of the large number of patients unable to accurately recall the nature of the proposed surgery or potential complications, following consent counselling.
Low-thrust mission risk analysis, with application to a 1980 rendezvous with the comet Encke
NASA Technical Reports Server (NTRS)
Yen, C. L.; Smith, D. B.
1973-01-01
A computerized failure process simulation procedure is used to evaluate the risk in a solar electric space mission. The procedure uses currently available thrust-subsystem reliability data and performs approximate simulations of the thrust sybsystem burn operation, the system failure processes, and the retargeting operations. The method is applied to assess the risks in carrying out a 1980 rendezvous mission to the comet Encke. Analysis of the results and evaluation of the effects of various risk factors on the mission show that system component failure rates are the limiting factors in attaining a high mission relability. It is also shown that a well-designed trajectory and system operation mode can be used effectively to partially compensate for unreliable thruster performance.
42 CFR 424.58 - Accreditation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... crosswalk. (iii) A detailed description of the organization's operational processes, including procedures... survey forms, guidelines and instructions to surveyors, quality review processes for deficiencies identified with accreditation requirements, and dispute resolution processes and policies when there is a...
42 CFR 424.58 - Accreditation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... crosswalk. (iii) A detailed description of the organization's operational processes, including procedures... survey forms, guidelines and instructions to surveyors, quality review processes for deficiencies identified with accreditation requirements, and dispute resolution processes and policies when there is a...
42 CFR 424.58 - Accreditation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... crosswalk. (iii) A detailed description of the organization's operational processes, including procedures... survey forms, guidelines and instructions to surveyors, quality review processes for deficiencies identified with accreditation requirements, and dispute resolution processes and policies when there is a...
The importance of production standard operating procedure in a family business company
NASA Astrophysics Data System (ADS)
Hongdiyanto, C.
2017-12-01
Plastic industry is a growing sector, therefore UD X which engage in this business has a great potential to grow as well. The problem faced by this family business company is that no standard operating procedure is used and it lead to problem in the quality and quantity produced. This research is aim to create a production standard operating procedure for UD X. Semistructure interview is used to gather information from respondent to help writer create the SOP. There are four SOP’s created, namely: classifying SOP, sorting SOP, milling SOP and packing SOP. Having SOP will improve the effectiveness of production because employees already know how to work in each stages of production process.
Satellite land use acquisition and applications to hydrologic planning models
NASA Technical Reports Server (NTRS)
Algazi, V. R.; Suk, M.
1977-01-01
A developing operational procedure for use by the Corps of Engineers in the acquisition of land use information for hydrologic planning purposes was described. The operational conditions preclude the use of dedicated, interactive image processing facilities. Given the constraints, an approach to land use classification based on clustering seems promising and was explored in detail. The procedure is outlined and examples of application to two watersheds given.
2013-01-07
of MFOP principles on processes, procedures , and costs in acquisition planning. It investigates MFOP and reviews the results of a 2005 submarine pilot...approach be a game changer? This paper evaluates the potential impact of MFOP principles on processes, procedures , and costs in acquisition planning. It...elli=lc=_rpfkbpp=C=mr_if`=mlif`v= = - 2 - k^s^i=mlpqdo^ar^qb=p`elli= procedures , and costs in acquisition planning. The scope of the research was to
The purpose of this SOP is to describe the flow of field data forms through the data processing system and to define who is responsible for the data at any time. It applies to field data forms collected and processed by NHEXAS Arizona. This procedure was followed to ensure consi...
Test/score/report: Simulation techniques for automating the test process
NASA Technical Reports Server (NTRS)
Hageman, Barbara H.; Sigman, Clayton B.; Koslosky, John T.
1994-01-01
A Test/Score/Report capability is currently being developed for the Transportable Payload Operations Control Center (TPOCC) Advanced Spacecraft Simulator (TASS) system which will automate testing of the Goddard Space Flight Center (GSFC) Payload Operations Control Center (POCC) and Mission Operations Center (MOC) software in three areas: telemetry decommutation, spacecraft command processing, and spacecraft memory load and dump processing. Automated computer control of the acceptance test process is one of the primary goals of a test team. With the proper simulation tools and user interface, the task of acceptance testing, regression testing, and repeatability of specific test procedures of a ground data system can be a simpler task. Ideally, the goal for complete automation would be to plug the operational deliverable into the simulator, press the start button, execute the test procedure, accumulate and analyze the data, score the results, and report the results to the test team along with a go/no recommendation to the test team. In practice, this may not be possible because of inadequate test tools, pressures of schedules, limited resources, etc. Most tests are accomplished using a certain degree of automation and test procedures that are labor intensive. This paper discusses some simulation techniques that can improve the automation of the test process. The TASS system tests the POCC/MOC software and provides a score based on the test results. The TASS system displays statistics on the success of the POCC/MOC system processing in each of the three areas as well as event messages pertaining to the Test/Score/Report processing. The TASS system also provides formatted reports documenting each step performed during the tests and the results of each step. A prototype of the Test/Score/Report capability is available and currently being used to test some POCC/MOC software deliveries. When this capability is fully operational it should greatly reduce the time necessary to test a POCC/MOC software delivery, as well as improve the quality of the test process.
Code of Federal Regulations, 2011 CFR
2011-10-01
... AND CERTIFICATION Inspection and Certification of Establishments and Fishery Products for Human Consumption Requirements for Plants Operating Under Continuous Inspection on A Contract Basis 1 § 260.103... for human food shall be removed and segregated prior to any further processing operation. (c) Official...
(abstract) Mission Operations and Control Assurance: Flight Operations Quality Improvements
NASA Technical Reports Server (NTRS)
Welz, Linda L.; Bruno, Kristin J.; Kazz, Sheri L.; Witkowski, Mona M.
1993-01-01
Mission Operations and Command Assurance (MO&CA), a recent addition to flight operations teams at JPL. provides a system level function to instill quality in mission operations. MO&CA's primary goal at JPL is to help improve the operational reliability for projects during flight. MO&CA tasks include early detection and correction of process design and procedural deficiencies within projects. Early detection and correction are essential during development of operational procedures and training of operational teams. MO&CA's effort focuses directly on reducing the probability of radiating incorrect commands to a spacecraft. Over the last seven years at JPL, MO&CA has become a valuable asset to JPL flight projects. JPL flight projects have benefited significantly from MO&CA's efforts to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit directly from previous and ongoing experience. Since MO&CA, like Total Quality Management (TQM), focuses on continuous improvement of processes and elimination of rework, we recommend that this effort be continued on NASA flight projects.
Computer program for calculating the flow field of supersonic ejector nozzles
NASA Technical Reports Server (NTRS)
Anderson, B. H.
1974-01-01
An analytical procedure for computing the performance of supersonic ejector nozzles is presented. This procedure includes real sonic line effects and an interaction analysis for the mixing process between the two streams. The procedure is programmed in FORTRAN 4 and has operated successfully on IBM 7094, IBM 360, CDC 6600, and Univac 1108.
Programming and Operations Lab 1--Intermediate, Data Processing Technology: 8025.23.
ERIC Educational Resources Information Center
Dade County Public Schools, Miami, FL.
The following course outline has been prepared as a guide toward helping the student develop an understanding of operating principles and procedures necessary in processing data electronically. Students who have met the objectives of Designing the Computer Program should be admitted to this course. The class meets 2 hours per day for 90 clock…
ERIC Educational Resources Information Center
Class, Norris E.; And Others
This statement of the enforcement of child day care licensing standards identifies basic concepts of the enforcement process and operational procedures necessary to bring about this process. Two types of enforcement operations, negative and positive enforcement of standards, are identified and examined in detail. Positive enforcement is defined as…
ERIC Educational Resources Information Center
Alberta Advanced Education and Technology, 2007
2007-01-01
The graduate of the Wire Process Operator apprenticeship program is a certified journeyperson who will be able to: (1) be skillful in the fusing of metals using prescribed welding applications; (2) have a working knowledge of the welding equipment involved with the various welding procedures; (3) comprehend drawings; (4) have a thorough knowledge…
EDRN Standard Operating Procedures (SOP) — EDRN Public Portal
The NCI’s Early Detection Research Network is developing a number of standard operating procedures for assays, methods, and protocols for collection and processing of biological samples, and other reference materials to assist investigators to conduct experiments in a consistent, reliable manner. These SOPs are established by the investigators of the Early Detection Research Network to maintain constancy throughout the Network. These SOPs represent neither a consensus, nor are the recommendations of NCI.
Language and arithmetic--a study using the intracarotid amobarbital procedure.
Delazer, Margarete; Karner, Elfriede; Unterberger, Iris; Walser, Gerald; Waldenberger, Peter; Trinka, Eugen; Benke, Thomas
2005-08-22
The intracarotid amobarbital procedure is used as a standard procedure in presurgical evaluation to assess hemispheric lateralization of language and memory, but has not been applied to investigate numerical processing. Patients with medically intractable epilepsy (n=20) were consecutively recruited during a presurgical evaluation programme. All 14 patients with left-lateralized language showed better arithmetic performance with the left hemisphere (intracarotid amobarbital procedure right), while five out of six patients with bilateral or right-hemispheric language representation showed better performance with the right hemisphere (intracarotid amobarbital procedure left). Furthermore, in patients with left-lateralized language, an interaction between intracarotid amobarbital procedure and type of arithmetic operation was found. The study suggests a close association between language lateralization and hemispheric specialization for arithmetic processing.
The purpose of this SOP is to describe the flow of field data forms through the data processing system and to define who is responsible for the data at any time. It applies to field data forms collected and processed by Arizona NHEXAS. This procedure was followed to ensure cons...
ERIC Educational Resources Information Center
Streiff, Paul R.
In 1974 new sections added to the Code of Federal Regulations and the Indian Affairs Field Manual required the establishment of programs of student rights and responsibilities and due process procedures in schools operated or funded by the Bureau of Indian Affairs. This two-part filmstrip and audio tape program is designed to assist educators and…
7 CFR 1486.303 - What specific contracting procedures must be adhered to?
Code of Federal Regulations, 2010 CFR
2010-01-01
... MARKETS PROGRAM Program Operations § 1486.303 What specific contracting procedures must be adhered to? (a...) Perform some form of fee, price, or cost analysis, such as a comparison of price quotations to market...) Document the decision-making process. ...
13 CFR 134.102 - Jurisdiction of OHA.
Code of Federal Regulations, 2013 CFR
2013-01-01
... SBA Employee Dispute Resolution Process cases (Employee Disputes) under Standard Operating Procedure... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Jurisdiction of OHA. 134.102 Section 134.102 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION RULES OF PROCEDURE GOVERNING...
13 CFR 134.102 - Jurisdiction of OHA.
Code of Federal Regulations, 2014 CFR
2014-01-01
... SBA Employee Dispute Resolution Process cases (Employee Disputes) under Standard Operating Procedure... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Jurisdiction of OHA. 134.102 Section 134.102 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION RULES OF PROCEDURE GOVERNING...
13 CFR 134.102 - Jurisdiction of OHA.
Code of Federal Regulations, 2012 CFR
2012-01-01
... SBA Employee Dispute Resolution Process cases (Employee Disputes) under Standard Operating Procedure... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Jurisdiction of OHA. 134.102 Section 134.102 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION RULES OF PROCEDURE GOVERNING...
40 CFR 240.207-3 - Recommended procedures: Operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended... appearance. (b) Solid wastes that cannot be processed by the facility should be removed from the facility at...
Reducing cost with autonomous operations of the Deep Space Network radio science receiver
NASA Technical Reports Server (NTRS)
Asmar, S.; Anabtawi, A.; Connally, M.; Jongeling, A.
2003-01-01
This paper describes the Radio Science Receiver system and the savings it has brought to mission operations. The design and implementation of remote and autonomous operations will be discussed along with the process of including user feedback along the way and lessons learned and procedures avoided.
ERIC Educational Resources Information Center
Radaj, Jane M.
2013-01-01
The study examined the contributions of "orthographic processing" factors to the spelling achievement of typically developing middle-elementary students. The researcher framed orthographic processing as a multilinguistic, multidimensional construct involving process factors related to procedural orthographic operations and product…
Current surgical treatment for chronic pancreatitis.
Aimoto, Takayuki; Uchida, Eiji; Nakamura, Yoshiharu; Yamahatsu, Kazuya; Matsushita, Akira; Katsuno, Akira; Cho, Kazumitsu; Kawamoto, Masao
2011-01-01
Chronic pancreatitis (CP) is a painful, yet benign inflammatory process of the pancreas. Surgical management should be individualized because the pain is multifactorial and its mechanisms vary from patient to patient. Two main pathogenetic theories for the mechanisms of pain in CP have been proposed: the neurogenic theory and the theory of increased intraductal/intraparenchymal pressures. The latter theory is strongly supported by the good results of drainage procedures in the surgical management of CP. Other possible contributing factors include pancreatic ischemia; a centrally sensitized pain state; and the development of complications, such as pseudocysts and stenosis of the duodenum or common bile duct. Common indications for surgery include intractable pain, suspicion of neoplasm, and complications that cannot be resolved with radiological or endoscopic treatments. Operative procedures have been historically classified into 4 categories: decompression procedures for diseased and obstructed pancreatic ducts; resection procedures for the proximal, distal, or total pancreas; denervation procedures of the pancreas; and hybrid procedures. Pancreaticoduodenectomy and pylorus-preserving pancreaticoduodenectomy, once the standard operations for patients with CP, have been replaced by hybrid procedures, such as duodenum-preserving pancreatic head resection, the Frey procedure, and their variants. These procedures are safe and effective in providing long-term pain relief and in treating CP-related complications. Hybrid procedures should be the operations of choice for patients with CP.
Janß, Armin; Thorn, Johannes; Schmitz, Malte; Mildner, Alexander; Dell'Anna-Pudlik, Jasmin; Leucker, Martin; Radermacher, Klaus
2018-02-23
Nowadays, only closed and proprietary integrated operating room systems (IORS) from big manufacturers are available on the market. Hence, the interconnection of components from third-party vendors is only possible with increased time and costs. In the context of the German Federal Ministry of Education and Research (BMBF)-funded project OR.NET (2012-2016), the open integration of medical devices from different manufacturers was addressed. An integrated operating theater based on the open communication standard IEEE 11073 shall give clinical operators the opportunity to choose medical devices independently of the manufacturer. This approach would be advantageous especially for hospital operators and small- and medium-sized enterprises (SME) of medical devices. Actual standards and concepts regarding technical feasibility and the approval process do not cope with the requirements for a modular integration of medical devices in the operating room (OR), based on an open communication standard. Therefore, innovative approval strategies and corresponding certification and test procedures, which cover actual legal and normative standards, have to be developed in order to support the future risk management and the usability engineering process of open integrated medical devices in the OR. The use of standardized device and service profiles and a three-step testing procedure, including conformity, interoperability and integration tests are described in this paper and shall support the manufacturers to integrate their medical devices without disclosing the medical devices' risk analysis and related confidential expertise or proprietary information.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roger Lew; Ronald L. Boring; Thomas A. Ulrich
Operators of critical processes, such as nuclear power production, must contend with highly complex systems, procedures, and regulations. Developing human-machine interfaces (HMIs) that better support operators is a high priority for ensuring the safe and reliable operation of critical processes. Human factors engineering (HFE) provides a rich and mature set of tools for evaluating the performance of HMIs, but the set of tools for developing and designing HMIs is still in its infancy. Here we propose that Microsoft Windows Presentation Foundation (WPF) is well suited for many roles in the research and development of HMIs for process control.
9 CFR 381.65 - Operations and procedures, generally.
Code of Federal Regulations, 2010 CFR
2010-01-01
... with visible fecal material shall be prevented from entering the chilling tank. (f) Detached ova may be... only to be moved to an official egg product processing plant for processing. Ova from condemned...
9 CFR 381.65 - Operations and procedures, generally.
Code of Federal Regulations, 2011 CFR
2011-01-01
... with visible fecal material shall be prevented from entering the chilling tank. (f) Detached ova may be... only to be moved to an official egg product processing plant for processing. Ova from condemned...
9 CFR 381.65 - Operations and procedures, generally.
Code of Federal Regulations, 2013 CFR
2013-01-01
... with visible fecal material shall be prevented from entering the chilling tank. (f) Detached ova may be... only to be moved to an official egg product processing plant for processing. Ova from condemned...
9 CFR 381.65 - Operations and procedures, generally.
Code of Federal Regulations, 2014 CFR
2014-01-01
... with visible fecal material shall be prevented from entering the chilling tank. (f) Detached ova may be... only to be moved to an official egg product processing plant for processing. Ova from condemned...
9 CFR 381.65 - Operations and procedures, generally.
Code of Federal Regulations, 2012 CFR
2012-01-01
... with visible fecal material shall be prevented from entering the chilling tank. (f) Detached ova may be... only to be moved to an official egg product processing plant for processing. Ova from condemned...
Shelton, Larry R.
1994-01-01
The U.S. Geological Survey's National Water-Quality Assessment program includes extensive data- collection efforts to assess the quality of the Nations's streams. These studies require analyses of stream samples for major ions, nutrients, sediments, and organic contaminants. For the information to be comparable among studies in different parts of the Nation, consistent procedures specifically designed to produce uncontaminated samples for trace analysis in the laboratory are critical. This field guide describes the standard procedures for collecting and processing samples for major ions, nutrients, organic contaminants, sediment, and field analyses of conductivity, pH, alkalinity, and dissolved oxygen. Samples are collected and processed using modified and newly designed equipment made of Teflon to avoid contamination, including nonmetallic samplers (D-77 and DH-81) and a Teflon sample splitter. Field solid-phase extraction procedures developed to process samples for organic constituent analyses produce an extracted sample with stabilized compounds for more accurate results. Improvements to standard operational procedures include the use of processing chambers and capsule filtering systems. A modified collecting and processing procedure for organic carbon is designed to avoid contamination from equipment cleaned with methanol. Quality assurance is maintained by strict collecting and processing procedures, replicate sampling, equipment blank samples, and a rigid cleaning procedure using detergent, hydrochloric acid, and methanol.
13 CFR 134.102 - Jurisdiction of OHA.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Employee Dispute Resolution Process cases (Employee Disputes) under Standard Operating Procedure 37 71 02... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Jurisdiction of OHA. 134.102 Section 134.102 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION RULES OF PROCEDURE GOVERNING...
AMO EXPRESS: A Command and Control Experiment for Crew Autonomy
NASA Technical Reports Server (NTRS)
Stetson, Howard K.; Frank, Jeremy; Cornelius, Randy; Haddock, Angie; Wang, Lui; Garner, Larry
2015-01-01
NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control demonstration of intelligent procedures to automatically initialize a rack onboard the International Space Station (ISS) with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). The autonomous operations concept includes a reduction of the amount of data a crew operator is required to verify during activation or de-activation, as well as integration of procedure execution status and relevant data in a single integrated display. During execution, the auto-procedures provide a step-by-step messaging paradigm and a high level status upon termination. This messaging and high level status is the only data generated for operator display. To enhance situational awareness of the operator, the Web-based Procedure Display (WebPD) provides a novel approach to the issues of procedure display and execution tracking. For this demonstration, the procedure was initiated and monitored from the ground. As the Timeliner sequences executed, their high level execution status was transmitted to ground, for WebPD consumption.
Specificity of Good Manufacturing Practice (GMP) for Biomedical Cell Products.
Tulina, M A; Pyatigorskaya, N V
2018-03-01
The article describes special aspects of Good Manufacturing Practice (GMP) for biomedical cell products (BMCP) that imply high standards of aseptics throughout the entire productio process, strict requirements to donors and to the procedure of biomaterial isolation, guaranty of tracing BMCP products, defining processing procedures which allow to identify BMCP as minimally manipulated; continuous quality control and automation of the control process at all stages of manufacturing, which will ensure product release simultaneously with completion of technological operations.
NASA Technical Reports Server (NTRS)
Stokes, LeBarian
2009-01-01
This procedure establishes a system for performing testing in the Six-Degree-Of-Freedom Dynamic Test System (SDTS). Testing includes development and verification testing of customer supplied Test Articles (TAs) and other testing requirements, as requested. This procedure applies to all SDTS testing operations and equipment. The procedure provides an overview of testing performed in the SDTS including test identification requirements, test planning and procedure development, test and performance inspection, test data analysis, and test report generation.
Computer-Mediated Group Processes in Distributed Command and Control Systems
1988-06-01
Linville, "Michael J. Liebhaber, and Richard W. Obermayer Vreuls Corporation Jon J. Fallesen Army Research Institute DTIC SELECTEr • AUG I 1. 1988 ARI...control staffs who will operate in a computer- mediated environment. The Army Research Institute has initiated research to examine selected issues...computar-mediated group processes is needed. Procedure: The identification and selection of key research issues followed a three- step procedure. Previous
Amplitude image processing by diffractive optics.
Cagigal, Manuel P; Valle, Pedro J; Canales, V F
2016-02-22
In contrast to the standard digital image processing, which operates over the detected image intensity, we propose to perform amplitude image processing. Amplitude processing, like low pass or high pass filtering, is carried out using diffractive optics elements (DOE) since it allows to operate over the field complex amplitude before it has been detected. We show the procedure for designing the DOE that corresponds to each operation. Furthermore, we accomplish an analysis of amplitude image processing performances. In particular, a DOE Laplacian filter is applied to simulated astronomical images for detecting two stars one Airy ring apart. We also check by numerical simulations that the use of a Laplacian amplitude filter produces less noisy images than the standard digital image processing.
Bowermaster, Rebecca; Miller, Megan; Ashcraft, Traci; Boyd, Michael; Brar, Anoop; Manning, Peter; Eghtesady, Pirooz
2015-02-01
Cardiac surgical procedures are complex and require the coordinated action of many. This creates the potential for small failures that could be the substrate for subsequent morbidity or mortality. High-reliability science suggests that preoccupation with small failures can lead to improved outcomes. Failures of all magnitudes (ie, events) were captured within the pediatric cardiac operating room starting with a single surgeon in April 2008. As the surgical team became more familiar with the process, failure recording was extended to all surgeons and all surgical procedures performed until the conclusion of the study in December 2010. New recording processes were developed and used on a rolling basis during this study. With systematic capture, event rates increased (from occurring within 20% to 50% of operative procedures). Although we identified 9 recurrent patterns, 2 categories (ie, Equipment and Patient Instability) accounted for almost half of the events (45%). The greatest number of events occurred during the prebypass period (40.2%), compared with bypass (20.1%) and postbypass (32.3%) periods. These events were mainly difficulties in access (31.8%), equipment (42.4%), and patient instability (33.3%) in each of the epochs, respectively. Of all events, 7.3% occurred during nonbypass cases, 30.6% of these were communication events. Implementation of this initiative led to recognition of major system-wide issues (eg, need for change in the blood-product acquisition process). Preoccupation with all failures in the operating room can reveal important information about the operating room and perioperative microenvironment that can prompt substantive process changes both locally and within the larger health system. Copyright © 2015 American College of Surgeons. Published by Elsevier Inc. All rights reserved.
Computerized engineering logic for nuclear procurement and dedication processes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tulay, M.P.
1996-12-31
In an attempt to better meet the needs of operations and maintenance organizations, many nuclear utility procurement engineering groups have simplified their procedures, developed on-line tools for performing the specification of replacement items, and developed relational databases containing part-level information necessary to automate the procurement process. Although these improvements have helped to reduce the engineering necessary to properly specify and accept/dedicate items for nuclear safety-related applications, a number of utilities have recognized that additional long-term savings can be realized by integrating a computerized logic to assist technical procurement engineering personnel. The most commonly used logic follows the generic processes containedmore » in Electric Power Research Institute (EPRI) published guidelines. The processes are typically customized to some extent to accommodate each utility`s organizational structure, operating procedures, and strategic goals. This paper will discuss a typical logic that integrates the technical evaluation, acceptance, and receipt inspection and testing processes. The logic this paper will describe has been successfully integrated at a growing number of nuclear utilities and has produced numerous positive results. The application of the logic ensures that utility-wide standards or procedures, common among multi-site utilities, are followed.« less
Spokane Community College Library Serials Operation Handbook.
ERIC Educational Resources Information Center
Waesche, Betty; Cargill, Katie
Listed are general policies for handling periodicals and specific policies for their acquisition, renewal, and processing, as well as procedures for checking in and claiming periodicals and handling duplicate copies. Flowcharts accompany procedural statements for claiming and checking-in periodicals and for dealing with duplicates. Specific duties…
13 CFR 134.801 - Scope of rules.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Dispute Resolution Process (EDRP). Standard Operating Procedure (SOP) 37 71 sets out the EDRP. It is... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Scope of rules. 134.801 Section 134.801 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION RULES OF PROCEDURE GOVERNING...
13 CFR 134.801 - Scope of rules.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Dispute Resolution Process (EDRP). Standard Operating Procedure (SOP) 37 71 sets out the EDRP. It is... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Scope of rules. 134.801 Section 134.801 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION RULES OF PROCEDURE GOVERNING...
13 CFR 134.801 - Scope of rules.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Dispute Resolution Process (EDRP). Standard Operating Procedure (SOP) 37 71 sets out the EDRP. It is... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Scope of rules. 134.801 Section 134.801 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION RULES OF PROCEDURE GOVERNING...
13 CFR 134.801 - Scope of rules.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Dispute Resolution Process (EDRP). Standard Operating Procedure (SOP) 37 71 sets out the EDRP. It is... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Scope of rules. 134.801 Section 134.801 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION RULES OF PROCEDURE GOVERNING...
NASA Astrophysics Data System (ADS)
Kasiani; Suhantono, Djoko; Mirah Kencanawati, AAA
2018-01-01
Candikuning is part of the district of Baturiti, tourism village, better known by the name of Bedugul. No less interesting is the variety of chips produced by two partner groups as a souvenir after the tour, such as Chips: Spinach; beans; Tempeh. The purpose of this research were to design a Standard Operating Procedure (SOP): Production Processes on the Home Industry Bedugul Baturiti Tabanan Bali. The data technic collected use: observation; Documentation; and then interview to collect information. The data analysis technic done by using the Miles & Huberman. Result this research that the draft SOP: Production Processes Chips (Menu). The conclusion in this research SOP Production Processes use with flowchart and description on the Home Industry Bedugul Baturiti Tabanan Bali.
Major, Piotr; Wysocki, Michał; Dworak, Jadwiga; Pędziwiatr, Michał; Pisarska, Magdalena; Wierdak, Mateusz; Zub-Pokrowiecka, Anna; Natkaniec, Michał; Małczak, Piotr; Nowakowski, Michał; Budzyński, Andrzej
2018-06-01
Laparoscopic sleeve gastrectomy (LSG) has become an attractive bariatric procedure with promising treatment effects yet amount of data regarding institutional learning process is limited. Retrospective study included patients submitted to LSG at academic teaching hospital. Patients were divided into groups every 100 consecutive patients. LSG introduction was structured along with Enhanced Recovery after Surgery (ERAS) treatment protocol. Primary endpoint was determining the LSG learning curve's stabilization point, using operative time, intraoperative difficulties, intraoperative adverse events (IAE), and number of stapler firings. Secondary endpoints: influence on perioperative complications and reoperations. Five hundred patients were included (330 females, median age of 40 (33-49) years). Operative time in G1-G2 differed significantly from G3-G5. Stabilization point was the 200th procedure using operative time. Intraoperative difficulties of G1 differed significantly from G2-G5, with stabilization after the 100th procedure. IAE and number of stapler firings could not be used as predictor. Based on perioperative morbidity, the learning curve was stabilized at the 100th procedure. The morbidity rates in the groups were G1, 13%; G2, 4%; G3, 5%; G4, 5%; and G5, 2%. The reoperation rate in G1 was 3%; G2, 2%; G3, 2%; G4, 1%; and G5, 0%. The institutional learning process stabilization point for LSG in a newly established bariatric center is between the 100th and 200th operation. Initially, the morbidity rate is high, which should concern surgeons who are willing to perform bariatric surgery.
An integrated computer-based procedure for teamwork in digital nuclear power plants.
Gao, Qin; Yu, Wenzhu; Jiang, Xiang; Song, Fei; Pan, Jiajie; Li, Zhizhong
2015-01-01
Computer-based procedures (CBPs) are expected to improve operator performance in nuclear power plants (NPPs), but they may reduce the openness of interaction between team members and harm teamwork consequently. To support teamwork in the main control room of an NPP, this study proposed a team-level integrated CBP that presents team members' operation status and execution histories to one another. Through a laboratory experiment, we compared the new integrated design and the existing individual CBP design. Sixty participants, randomly divided into twenty teams of three people each, were assigned to the two conditions to perform simulated emergency operating procedures. The results showed that compared with the existing CBP design, the integrated CBP reduced the effort of team communication and improved team transparency. The results suggest that this novel design is effective to optim team process, but its impact on the behavioural outcomes may be moderated by more factors, such as task duration. The study proposed and evaluated a team-level integrated computer-based procedure, which present team members' operation status and execution history to one another. The experimental results show that compared with the traditional procedure design, the integrated design reduces the effort of team communication and improves team transparency.
Mitello, Lucia; D'Alba, Fabrizio; Milito, Francesca; Monaco, Cinzia; Orazi, Daniela; Battilana, Daniela; Marucci, Anna Rita; Longo, Angelo; Latina, Roberto
2017-01-01
The management of operating rooms (ORs) is a complex process which requires an effective organizational scheme. In order to amore convinient allocation of resources a rigorous monitoring plan is needed to ensure operating rooms performances. All the necessary actions should be taken to improve the quality of the planning and scheduling procedure. Between April-December, 2016 an organizational analysis has been carried out on the performances of the A.O. S. Camillo-Forlanini Hospital Operating Block applying the "process management" approach to the ORs efficiency. The project involved two different surgical areas of the same operating block the multi-specialist and elective surgery and cardio-vascular surgery . The analyses of the processes was made through the product, patient and safety approach and from different points of view: the "asis", process and stakeholder perspectives. Descriptive statistics was used to process raw data and Student's t-distribution was used to assess the difference between the two means (significant p value ˂0,05). The Coefficient of Variation (CV) was used to describe the variabilityamong data. The asis approach allowed us to describe the ORs inbound activities. For both operating block the most demanding weekly commitments in terms of time turned out to be the inventory management procedures of controlling and stocking medicines, general medical supplies and instruments (130[DS=±14] for BOE and 30[DS=±18] for CCH. The average time spent on preparing the operating room, separately calculated starting from the first surgical case, was of 27 minutes (SD=± 17) while for the following surgical procedures preparation time decreased to 15 minutes (SD= ± 10), which highlighted a meaningful difference of 12 minutes. A great variability was registered in CCH due to the unpredictability of these operations (CV 82%). The stakeholders' perspective revealed a reasonable level of satisfaction among nurses and surgeons (2.9 vs 2.3, respectively) and in anesthesiologist (2.8-BOE vs 2.4 CCH).Being brought to the surgical suite from an "external Unit" seems to have negatively influenced the patient's perception: preparation time turned out to be significantly lower for CCH patients rather than BOE ones (p˂0,001).The results of the safety procedure approach highlighted a moderate criticality in terms of cleaning up time and delay in the starting time of the first surgical case. More effort should be made to avoid any slowdown during the whole process. It is advisable to implement a lean system that may improve efficiency and quality of the service to reduce wastes and unproductive times. This would inevitably generate a more positive outcomes.
The purpose of this SOP is to describe the steps to be taken when field samples are received at Battelle Laboratory for further analysis. The procedure provides for the log-in, initial processing (if required), and distribution of the sample. Procedures concerning the sample Ch...
NASA Technical Reports Server (NTRS)
1976-01-01
The recommendations, procedures, and techniques are summarized which provided by the Kodak Apparatus Division to the Ames Research Center to support the Earth Resources Aircraft Program at that facility. Recommendations, procedures, and calibration data are included for sensitometry, densitometry, laboratory cleanliness, and determination of camera exposure. Additional comments are made regarding process control procedures and general laboratory operations.
NASA Technical Reports Server (NTRS)
1981-01-01
The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.
Queueing Network Models for Parallel Processing of Task Systems: an Operational Approach
NASA Technical Reports Server (NTRS)
Mak, Victor W. K.
1986-01-01
Computer performance modeling of possibly complex computations running on highly concurrent systems is considered. Earlier works in this area either dealt with a very simple program structure or resulted in methods with exponential complexity. An efficient procedure is developed to compute the performance measures for series-parallel-reducible task systems using queueing network models. The procedure is based on the concept of hierarchical decomposition and a new operational approach. Numerical results for three test cases are presented and compared to those of simulations.
NASA Astrophysics Data System (ADS)
Erickson, C. M.; Martinez, A.
1993-06-01
The 1992 Integrated Modular Engine (IME) design concept, proposed to the Air Force Space Systems Division as a candidate for a National Launch System (NLS) upper stage, emphasized a detailed Quality Functional Deployment (QFD) procedure which set the basis for its final selection. With a list of engine requirements defined and prioritized by the customer, a QFD procedure was implemented where the characteristics of a number of engine and component configurations were assessed for degree of requirement satisfaction. The QFD process emphasized operability, cost, reliability and performance, with relative importance specified by the customer. Existing technology and near-term advanced technology were surveyed to achieve the required design strategies. In the process, advanced nozzles, advanced turbomachinery, valves, controls, and operational procedures were evaluated. The integrated arrangement of three conventional bell nozzle thrust chambers with two advanced turbopump sets selected as the configuration meeting all requirements was rated significantly ahead of the other candidates, including the Aerospike and horizontal flow nozzle configurations.
The effects of type of knowledge upon human problem solving in a process control task
NASA Technical Reports Server (NTRS)
Morris, N. M.; Rouse, W. B.
1985-01-01
The question of what the operator of a dynamic system needs to know was investigated in an experiment using PLANT, a simulation of a generic dynamic production process. Knowledge of PLANT was manipulated via different types of instruction, so that four different groups were created: (1) minimal instructions only; (2) minimal instructions and guidelines for operation (procedures); (3) minimal instructions and dynamic relationships (principles); and (4) minimal instructions, and procedures, and principles. Subjects controlled PLANT in a variety of situations which required maintaining production while also diagnosing familiar and unfamiliar failures. Despite the fact that these manipulations resulted in differences in subjects' Knowledge, as assessed via a written test at the end of the experiment, instructions had no effect upon achievement of the primary goal of production, or upon subjects' ability to diagnose unfamiliar failures. However, those groups receiving procedures controlled the system in a more stable manner. Possible reasons for the failure to find an effect of principles are presented, and the implications of these results for operator training and aiding are discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... (SOP) of the Aircraft Certification Service (AIR) Project Prioritization and Resource Management ACTION... procedure (SOP) describing the process used to prioritize certification projects and manage certification project resources when local resources are not available. DATES: Comments must be received on or before...
31 CFR 206.3 - Billing policy and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., DISBURSEMENTS, AND OPERATION OF THE CASH MANAGEMENT IMPROVEMENTS FUND § 206.3 Billing policy and procedures. The billing process is considered an integral part of an effective cash management collection program. In those situations where bills are required and the failure to bill would affect the cash flow, bills will...
31 CFR 206.3 - Billing policy and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., DISBURSEMENTS, AND OPERATION OF THE CASH MANAGEMENT IMPROVEMENTS FUND § 206.3 Billing policy and procedures. The billing process is considered an integral part of an effective cash management collection program. In those situations where bills are required and the failure to bill would affect the cash flow, bills will...
31 CFR 206.3 - Billing policy and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., DISBURSEMENTS, AND OPERATION OF THE CASH MANAGEMENT IMPROVEMENTS FUND § 206.3 Billing policy and procedures. The billing process is considered an integral part of an effective cash management collection program. In those situations where bills are required and the failure to bill would affect the cash flow, bills will...
31 CFR 206.3 - Billing policy and procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., DISBURSEMENTS, AND OPERATION OF THE CASH MANAGEMENT IMPROVEMENTS FUND § 206.3 Billing policy and procedures. The billing process is considered an integral part of an effective cash management collection program. In those situations where bills are required and the failure to bill would affect the cash flow, bills will...
Procedures of Operation at Cranbrook Central Library.
ERIC Educational Resources Information Center
Cranbrook Institutions, Bloomfield Hills, MI. Central Library.
This manual outlines the ordering, cataloging and classification, and processing procedures for books, periodicals, government documents, and non-book materials for a central library serving three schools--a co-ed elementary school and separate junior-senior high schools for boys and girls--and four special libraries--a fine and rare books…
Finite machines, mental procedures, and modern physics.
Lupacchini, Rossella
2007-01-01
A Turing machine provides a mathematical definition of the natural process of calculating. It rests on trust that a procedure of reason can be reproduced mechanically. Turing's analysis of the concept of mechanical procedure in terms of a finite machine convinced Gödel of the validity of the Church thesis. And yet, Gödel's later concern was that, insofar as Turing's work shows that "mental procedure cannot go beyond mechanical procedures", it would imply the same kind of limitation on human mind. He therefore deems Turing's argument to be inconclusive. The question then arises as to which extent a computing machine operating by finite means could provide an adequate model of human intelligence. It is argued that a rigorous answer to this question can be given by developing Turing's considerations on the nature of mental processes. For Turing such processes are the consequence of physical processes and he seems to be led to the conclusion that quantum mechanics could help to find a more comprehensive explanation of them.
NASA Astrophysics Data System (ADS)
Malago`, M.; Mucchi, E.; Dalpiaz, G.
2016-03-01
Heavy duty wheels are used in applications such as automatic vehicles and are mainly composed of a polyurethane tread glued to a cast iron hub. In the manufacturing process, the adhesive application between tread and hub is a critical assembly phase, since it is completely made by an operator and a contamination of the bond area may happen. Furthermore, the presence of rust on the hub surface can contribute to worsen the adherence interface, reducing the operating life. In this scenario, a quality control procedure for fault detection to be used at the end of the manufacturing process has been developed. This procedure is based on vibration processing techniques and takes advantages of the results of a lumped parameter model. Indicators based on cyclostationarity can be considered as key parameters to be adopted in a monitoring test station at the end of the production line due to their not deterministic characteristics.
40 CFR 240.210 - General operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 24 2010-07-01 2010-07-01 false General operations. 240.210 Section 240.210 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended Procedures § 240.210 General...
Designing a process for executing projects under an international agreement
NASA Technical Reports Server (NTRS)
Mohan, S. N.
2003-01-01
Projects executed under an international agreement require special arrangements in order to operate within confines of regulations issued by the State Department and the Commerce Department. In order to communicate enterprise-level guidance and procedural information uniformly to projects based on interpretations that carry the weight of institutional authority, a process was developed. This paper provides a script for designing processes in general, using this particular process for context. While the context is incidental, the method described is applicable to any process in general. The paper will expound on novel features utilized for dissemination of the procedural details over the Internet following such process design.
Manning, T.K.; Smith, K.E.; Wood, C.D.; Williams, J.B.
1994-01-01
Water-quality samples were collected from Chicod Creek in the Coastal Plain Province of North Carolina during the summer of 1992 as part of the U.S. Geological Survey's National Water-Quality Assessment Program. Chicod Creek is in the Albemarle-Pamlico drainage area, one of four study units designated to test equipment and procedures for collecting and processing samples for the solid-phase extraction of selected pesticides, The equipment and procedures were used to isolate 47 pesticides, including organonitrogen, carbamate, organochlorine, organophosphate, and other compounds, targeted to be analyzed by gas chromatography/mass spectrometry. Sample-collection and processing equipment equipment cleaning and set-up procedures, methods pertaining to collecting, splitting, and solid-phase extraction of samples, and water-quality data resulting from the field test are presented in this report Most problems encountered during this intensive sampling exercise were operational difficulties relating to equipment used to process samples.
Zimmerman, Janice L; Sprung, Charles L
2010-04-01
To provide recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza pandemic or mass disaster with a specific focus on ensuring that adequate resources are available and appropriate protocols are developed to safely perform procedures in patients with and without influenza illness. Based on a literature review and expert opinion, a Delphi process was used to define the essential topics including performing medical procedures. Key recommendations include: (1) specify high-risk procedures (aerosol generating-procedures); (2) determine if certain procedures will not be performed during a pandemic; (3) develop protocols for safe performance of high-risk procedures that include appropriateness, qualifications of personnel, site, personal protection equipment, safe technique and equipment needs; (4) ensure adequate training of personnel in high-risk procedures; (5) procedures should be performed at the bedside whenever possible; (6) ensure safe respiratory therapy practices to avoid aerosols; (7) provide safe respiratory equipment; and (8) determine criteria for cancelling and/or altering elective procedures. Judicious planning and adoption of protocols for safe performance of medical procedures are necessary to optimize outcomes during a pandemic.
Traversari, Roberto; Goedhart, Rien; Schraagen, Jan Maarten
2013-01-01
The objective is evaluation of a traditionally designed operating room using simulation of various surgical workflows. A literature search showed that there is no evidence for an optimal operating room layout regarding the position and size of an ultraclean ventilation (UCV) canopy with a separate preparation room for laying out instruments and in which patients are induced in the operating room itself. Neither was literature found reporting on process simulation being used for this application. Many technical guidelines and designs have mainly evolved over time, and there is no evidence on whether the proposed measures are also effective for the optimization of the layout for workflows. The study was conducted by applying observational techniques to simulated typical surgical procedures. Process simulations which included complete surgical teams and equipment required for the intervention were carried out for four typical interventions. Four observers used a form to record conflicts with the clean area boundaries and the height of the supply bridge. Preferences for particular layouts were discussed with the surgical team after each simulated procedure. We established that a clean area measuring 3 × 3 m and a supply bridge height of 2.05 m was satisfactory for most situations, provided a movable operation table is used. The only cases in which conflicts with the supply bridge were observed were during the use of a surgical robot (Da Vinci) and a surgical microscope. During multiple trauma interventions, bottlenecks regarding the dimensions of the clean area will probably arise. The process simulation of four typical interventions has led to significantly different operating room layouts than were arrived at through the traditional design process. Evidence-based design, human factors, work environment, operating room, traditional design, process simulation, surgical workflowsPreferred Citation: Traversari, R., Goedhart, R., & Schraagen, J. M. (2013). Process simulation during the design process makes the difference: Process simulations applied to a traditional design. Health Environments Research & Design Journal 6(2), pp 58-76.
SSS-A attitude control prelaunch analysis and operations plan
NASA Technical Reports Server (NTRS)
Werking, R. D.; Beck, J.; Gardner, D.; Moyer, P.; Plett, M.
1971-01-01
A description of the attitude control support being supplied by the Mission and Data Operations Directorate is presented. Descriptions of the computer programs being used to support the mission for attitude determination, prediction, control, and definitive attitude processing are included. In addition, descriptions of the operating procedures which will be used to accomplish mission objectives are provided.
Code of Federal Regulations, 2014 CFR
2014-07-01
... pounds per million Btu of steam output, in Tables 1 or 2 to this subpart are an alternative applicable only to boilers and process heaters that generate steam. The output-based emission limits, in units of..., monitoring results, review of operation and maintenance procedures, review of operation and maintenance...
Code of Federal Regulations, 2013 CFR
2013-07-01
... pounds per million Btu of steam output, in Tables 1 or 2 to this subpart are an alternative applicable only to boilers and process heaters that generate steam. The output-based emission limits, in units of..., monitoring results, review of operation and maintenance procedures, review of operation and maintenance...
Software System Architecture Modeling Methodology for Naval Gun Weapon Systems
2010-12-01
Weapon System HAR Hazard Action Report HERO Hazards of Electromagnetic Radiation to Ordnance IOC Initial Operational Capability... radiation to ordnance ; and combinations therein. Equipment, systems, or procedures and processes whose malfunction would hazard the safe manufacturing...NDI Non-Development Item OPEVAL Operational Evaluation ORDALTS Ordnance Alterations O&SHA Operating and Support Hazard Analysis PDA
CTEPP STANDARD OPERATING PROCEDURE FOR PROCESSING COMPLETED DATA FORMS (SOP-4.10)
This SOP describes the methods for processing completed data forms. Key components of the SOP include (1) field editing, (2) data form Chain-of-Custody, (3) data processing verification, (4) coding, (5) data entry, (6) programming checks, (7) preparation of data dictionaries, cod...
NASA Technical Reports Server (NTRS)
Miller, L.
1980-01-01
A facility which produces electrodes for spacecraft power supplies is described. The electrode assembly procedures are discussed. A number of design features in the production process are reported including a batch operation mode and an independent equipment module design approach for transfering the electrode materials from process tank to process tank.
NASA Astrophysics Data System (ADS)
Esparza, Javier
In many areas of computer science entities can “reproduce”, “replicate”, or “create new instances”. Paramount examples are threads in multithreaded programs, processes in operating systems, and computer viruses, but many others exist: procedure calls create new incarnations of the callees, web crawlers discover new pages to be explored (and so “create” new tasks), divide-and-conquer procedures split a problem into subproblems, and leaves of tree-based data structures become internal nodes with children. For lack of a better name, I use the generic term systems with process creation to refer to all these entities.
NASA Technical Reports Server (NTRS)
HarrisonFleming, Cody; Spencer, Melissa; Leveson, Nancy; Wilkinson, Chris
2012-01-01
The generation of minimum operational, safety, performance, and interoperability requirements is an important aspect of safely integrating new NextGen components into the Communication Navigation Surveillance and Air Traffic Management (CNS/ATM) system. These requirements are used as part of the implementation and approval processes. In addition, they provide guidance to determine the levels of design assurance and performance that are needed for each element of the new NextGen procedures, including aircraft, operator, and Air Navigation and Service Provider. Using the enhanced Airborne Traffic Situational Awareness for InTrail Procedure (ATSA-ITP) as an example, this report describes some limitations of the current process used for generating safety requirements and levels of required design assurance. An alternative process is described, as well as the argument for why the alternative can generate more comprehensive requirements and greater safety assurance than the current approach.
PRODUCTION OF HEAVY WATER SAVANNAH RIVER AND DANA PLANTS. Technical Manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bebbington, W.P.; Thayer, V.R. eds.; Proctor, J.F. comp.
1959-07-01
A summary is presented of the basic technical iniormation that pertains to processes that are used at the Dana and Savannah River Plants for the production of heavy water. The manual is intended primarily for plant operating and technical personnel and was prepared to supplement and provide technical support for detailed operating procedures. Introductory sections contain some background information on the history, uses, available processes, and analytical procedures for heavy water. They also include a general comparison of the design and laserformance of the two plants and an analysis of their differences. The technology of the heavy water separation processesmore » used, namely hydrogen sulfide exchange, distillation of water, and electrolysis is discussed in detail. The manufacture and storage of hydrogen sulfide gas and the process water treatment facilities are also discussed. (auth)« less
MIRADS-2 Implementation Manual
NASA Technical Reports Server (NTRS)
1975-01-01
The Marshall Information Retrieval and Display System (MIRADS) which is a data base management system designed to provide the user with a set of generalized file capabilities is presented. The system provides a wide variety of ways to process the contents of the data base and includes capabilities to search, sort, compute, update, and display the data. The process of creating, defining, and loading a data base is generally called the loading process. The steps in the loading process which includes (1) structuring, (2) creating, (3) defining, (4) and implementing the data base for use by MIRADS are defined. The execution of several computer programs is required to successfully complete all steps of the loading process. This library must be established as a cataloged mass storage file as the first step in MIRADS implementation. The procedure for establishing the MIRADS Library is given. The system is currently operational for the UNIVAC 1108 computer system utilizing the Executive Operating System. All procedures relate to the use of MIRADS on the U-1108 computer.
Murray, Jessica R.; Svarc, Jerry L.
2017-01-01
The U.S. Geological Survey Earthquake Science Center collects and processes Global Positioning System (GPS) data throughout the western United States to measure crustal deformation related to earthquakes and tectonic processes as part of a long‐term program of research and monitoring. Here, we outline data collection procedures and present the GPS dataset built through repeated temporary deployments since 1992. This dataset consists of observations at ∼1950 locations. In addition, this article details our data processing and analysis procedures, which consist of the following. We process the raw data collected through temporary deployments, in addition to data from continuously operating western U.S. GPS stations operated by multiple agencies, using the GIPSY software package to obtain position time series. Subsequently, we align the positions to a common reference frame, determine the optimal parameters for a temporally correlated noise model, and apply this noise model when carrying out time‐series analysis to derive deformation measures, including constant interseismic velocities, coseismic offsets, and transient postseismic motion.
Natural Resource Information System. Volume 2: System operating procedures and instructions
NASA Technical Reports Server (NTRS)
1972-01-01
A total computer software system description is provided for the prototype Natural Resource Information System designed to store, process, and display data of maximum usefulness to land management decision making. Program modules are described, as are the computer file design, file updating methods, digitizing process, and paper tape conversion to magnetic tape. Operating instructions for the system, data output, printed output, and graphic output are also discussed.
Combating Terrorism: A Conceptual Framework for Targeting at the Operational Level
2004-06-17
for Joint Intelligence Preparation of the Battlespace. The key process is the JIPB which is tried and tested , offering a very logical and clear...Intelligence Preparation of the Battlespace (JIPB) process, as published in Joint Publication 2-01.3, Joint Tactics, Techniques, and Procedures for Joint...Intelligence Preparation of the Battlespace, 24 May 2000, for its application to targeting terrorism at the operational level. The
USDA-ARS?s Scientific Manuscript database
Introduction: Safety regulations are being drafted for the shell egg industry. Sanitation standard operating procedures are an important precursor to HACCP regulations. Salmonella is the pathogen was most often associated with egg-borne outbreaks. Developing effective sanitation procedures that wil...
NHEXAS PHASE I ARIZONA STUDY--STANDARD OPERATING PROCEDURE FOR FORM QA/QC CHECKS (UA-C-2.0)
The purpose of this SOP is to outline the process of Field Quality Assurance and Quality Control checks. This procedure was followed to ensure consistent data retrieval during the Arizona NHEXAS project and the "Border" study. Keywords: custody; QA/QC; field checks.
The Nation...
Operating room data management: improving efficiency and safety in a surgical block.
Agnoletti, Vanni; Buccioli, Matteo; Padovani, Emanuele; Corso, Ruggero M; Perger, Peter; Piraccini, Emanuele; Orelli, Rebecca Levy; Maitan, Stefano; Dell'amore, Davide; Garcea, Domenico; Vicini, Claudio; Montella, Teresa Maria; Gambale, Giorgio
2013-03-11
European Healthcare Systems are facing a difficult period characterized by increasing costs and spending cuts due to economic problems. There is the urgent need for new tools which sustain Hospitals decision makers work. This project aimed to develop a data recording system of the surgical process of every patient within the operating theatre. The primary goal was to create a practical and easy data processing tool to give hospital managers, anesthesiologists and surgeons the information basis to increase operating theaters efficiency and patient safety. The developed data analysis tool is embedded in an Oracle Business Intelligence Environment, which processes data to simple and understandable performance tachometers and tables. The underlying data analysis is based on scientific literature and the projects teams experience with tracked data. The system login is layered and different users have access to different data outputs depending on their professional needs. The system is divided in the tree profile types Manager, Anesthesiologist and Surgeon. Every profile includes subcategories where operators can access more detailed data analyses. The first data output screen shows general information and guides the user towards more detailed data analysis. The data recording system enabled the registration of 14.675 surgical operations performed from 2009 to 2011. Raw utilization increased from 44% in 2009 to 52% in 2011. The number of high complexity surgical procedures (≥120 minutes) has increased in certain units while decreased in others. The number of unscheduled procedures performed has been reduced (from 25% in 2009 to 14% in 2011) while maintaining the same percentage of surgical procedures. The number of overtime events decreased in 2010 (23%) and in 2011 (21%) compared to 2009 (28%) and the delays expressed in minutes are almost the same (mean 78 min). The direct link found between the complexity of surgical procedures, the number of unscheduled procedures and overtime show a positive impact of the project on OR management. Despite a consistency in the complexity of procedures (19% in 2009 and 21% in 2011), surgical groups have been successful in reducing the number of unscheduled procedures (from 25% in 2009 to 14% in 2011) and overtime (from 28% in 2009 to 21% in 2011). The developed project gives healthcare managers, anesthesiologists and surgeons useful information to increase surgical theaters efficiency and patient safety. In difficult economic times is possible to develop something that is of some value to the patient and healthcare system too.
Operating room data management: improving efficiency and safety in a surgical block
2013-01-01
Background European Healthcare Systems are facing a difficult period characterized by increasing costs and spending cuts due to economic problems. There is the urgent need for new tools which sustain Hospitals decision makers work. This project aimed to develop a data recording system of the surgical process of every patient within the operating theatre. The primary goal was to create a practical and easy data processing tool to give hospital managers, anesthesiologists and surgeons the information basis to increase operating theaters efficiency and patient safety. Methods The developed data analysis tool is embedded in an Oracle Business Intelligence Environment, which processes data to simple and understandable performance tachometers and tables. The underlying data analysis is based on scientific literature and the projects teams experience with tracked data. The system login is layered and different users have access to different data outputs depending on their professional needs. The system is divided in the tree profile types Manager, Anesthesiologist and Surgeon. Every profile includes subcategories where operators can access more detailed data analyses. The first data output screen shows general information and guides the user towards more detailed data analysis. The data recording system enabled the registration of 14.675 surgical operations performed from 2009 to 2011. Results Raw utilization increased from 44% in 2009 to 52% in 2011. The number of high complexity surgical procedures (≥120 minutes) has increased in certain units while decreased in others. The number of unscheduled procedures performed has been reduced (from 25% in 2009 to 14% in 2011) while maintaining the same percentage of surgical procedures. The number of overtime events decreased in 2010 (23%) and in 2011 (21%) compared to 2009 (28%) and the delays expressed in minutes are almost the same (mean 78 min). The direct link found between the complexity of surgical procedures, the number of unscheduled procedures and overtime show a positive impact of the project on OR management. Despite a consistency in the complexity of procedures (19% in 2009 and 21% in 2011), surgical groups have been successful in reducing the number of unscheduled procedures (from 25% in 2009 to 14% in 2011) and overtime (from 28% in 2009 to 21% in 2011). Conclusions The developed project gives healthcare managers, anesthesiologists and surgeons useful information to increase surgical theaters efficiency and patient safety. In difficult economic times is possible to develop something that is of some value to the patient and healthcare system too. PMID:23496977
40 CFR 240.210-1 - Requirement.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Requirement. 240.210-1 Section 240.210... THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended Procedures § 240.210-1 Requirement... the design requirements. An operations manual describing the various tasks to be performed, operating...
40 CFR 240.210-1 - Requirement.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Requirement. 240.210-1 Section 240.210... THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended Procedures § 240.210-1 Requirement... the design requirements. An operations manual describing the various tasks to be performed, operating...
40 CFR 240.210-1 - Requirement.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Requirement. 240.210-1 Section 240.210... THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended Procedures § 240.210-1 Requirement... the design requirements. An operations manual describing the various tasks to be performed, operating...
Automated Instructional Management Systems (AIMS) Version III, Users Manual.
ERIC Educational Resources Information Center
New York Inst. of Tech., Old Westbury.
This document sets forth the procedures necessary to utilize and understand the operating characteristics of the Automated Instructional Management System - Version III, a computer-based system for management of educational processes. Directions for initialization, including internal and user files; system and operational input requirements;…
News release from February 10, 2005 announcing a memorandum of understanding (MOU) that offers a joint framework to improve permit application procedures for surface coal mining operations that place dredged or fill material in waters of the United States.
48 CFR 52.222-2 - Payment for Overtime Premiums.
Code of Federal Regulations, 2010 CFR
2010-10-01
... in connection with administration, protection, transportation, maintenance, standby plant protection, operation of utilities, or accounting; (3) To perform tests, industrial processes, laboratory procedures...
[Standardization and modeling of surgical processes].
Strauss, G; Schmitz, P
2016-12-01
Due to the technological developments around the operating room, surgery in the twenty-first century is undergoing a paradigm shift. Which technologies have already been integrated into the surgical routine? How can a favorable cost-benefit balance be achieved by the implementation of new software-based assistance systems? This article presents the state of the art technology as exemplified by a semi-automated operation system for otorhinolaryngology surgery. The main focus is on systems for implementation of digital handbooks and navigational functions in situ. On the basis of continuous development in digital imaging, decisions may by facilitated by individual patient models thus allowing procedures to be optimized. The ongoing digitization and linking of all relevant information enable a high level of standardization in terms of operating procedures. This may be used by assistance systems as a basis for complete documentation and high process reliability. Automation of processes in the operating room results in an increase in quality, precision and standardization so that the effectiveness and efficiency of treatment can be improved; however, care must be taken that detrimental consequences, such as loss of skills and placing too much faith in technology must be avoided by adapted training concepts.
Evaluation of low-cost commercial-off-the-shelf autopilot systems for SUAS operations
NASA Astrophysics Data System (ADS)
Brown, Calvin Thomas
With this increase in unmanned aircraft system (UAS) operations, there is a need for a structured process to evaluate different commercially available systems, particularly autopilots. The Remotely Operated Aircraft Management, Interpretation, and Navigation from Ground or ROAMING scale was developed to meet this need. This scale is a modification of the widely accepted Handling Qualities Rating scale developed by George Cooper and Robert Harper Jr. The Cooper-Harper scale allows pilots to rate a vehicle's performance in completing some task. Similarly, the ROAMING scale allows UAS operators to evaluate the management and observability of UAS in completing some task. The standardized evaluative process consists of cost, size, weight, and power (SWAP) analysis, ease of implementation through procedural description of setup, ROAMING scale rating, a slightly modified NASA TLX rating, and comparison of manual operation to autonomous operation of the task. This standard for evaluation of autopilots and their software will lead to better understanding of the workload placed on UAS operators and indicate where improvements to design and operational procedures can be made. An assortment of low-cost commercial-off-the-shelf (COTS) autopilots were selected for use in the development of the evaluation and results of these tests demonstrate the commonalities and differences in these systems.
SU-E-T-419: Workflow and FMEA in a New Proton Therapy (PT) Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cheng, C; Wessels, B; Hamilton, H
2014-06-01
Purpose: Workflow is an important component in the operational planning of a new proton facility. By integrating the concept of failure mode and effect analysis (FMEA) and traditional QA requirements, a workflow for a proton therapy treatment course is set up. This workflow serves as the blue print for the planning of computer hardware/software requirements and network flow. A slight modification of the workflow generates a process map(PM) for FMEA and the planning of QA program in PT. Methods: A flowchart is first developed outlining the sequence of processes involved in a PT treatment course. Each process consists of amore » number of sub-processes to encompass a broad scope of treatment and QA procedures. For each subprocess, the personnel involved, the equipment needed and the computer hardware/software as well as network requirements are defined by a team of clinical staff, administrators and IT personnel. Results: Eleven intermediate processes with a total of 70 sub-processes involved in a PT treatment course are identified. The number of sub-processes varies, ranging from 2-12. The sub-processes within each process are used for the operational planning. For example, in the CT-Sim process, there are 12 sub-processes: three involve data entry/retrieval from a record-and-verify system, two controlled by the CT computer, two require department/hospital network, and the other five are setup procedures. IT then decides the number of computers needed and the software and network requirement. By removing the traditional QA procedures from the workflow, a PM is generated for FMEA analysis to design a QA program for PT. Conclusion: Significant efforts are involved in the development of the workflow in a PT treatment course. Our hybrid model of combining FMEA and traditional QA program serves a duo purpose of efficient operational planning and designing of a QA program in PT.« less
A method of setting limits for the purpose of quality assurance
NASA Astrophysics Data System (ADS)
Sanghangthum, Taweap; Suriyapee, Sivalee; Kim, Gwe-Ya; Pawlicki, Todd
2013-10-01
The result from any assurance measurement needs to be checked against some limits for acceptability. There are two types of limits; those that define clinical acceptability (action limits) and those that are meant to serve as a warning that the measurement is close to the action limits (tolerance limits). Currently, there is no standard procedure to set these limits. In this work, we propose an operational procedure to set tolerance limits and action limits. The approach to establish the limits is based on techniques of quality engineering using control charts and a process capability index. The method is different for tolerance limits and action limits with action limits being categorized into those that are specified and unspecified. The procedure is to first ensure process control using the I-MR control charts. Then, the tolerance limits are set equal to the control chart limits on the I chart. Action limits are determined using the Cpm process capability index with the requirements that the process must be in-control. The limits from the proposed procedure are compared to an existing or conventional method. Four examples are investigated: two of volumetric modulated arc therapy (VMAT) point dose quality assurance (QA) and two of routine linear accelerator output QA. The tolerance limits range from about 6% larger to 9% smaller than conventional action limits for VMAT QA cases. For the linac output QA, tolerance limits are about 60% smaller than conventional action limits. The operational procedure describe in this work is based on established quality management tools and will provide a systematic guide to set up tolerance and action limits for different equipment and processes.
Best practice guidelines for the operation of a donor human milk bank in an Australian NICU.
Hartmann, B T; Pang, W W; Keil, A D; Hartmann, P E; Simmer, K
2007-10-01
Until the establishment of the PREM Bank (Perron Rotary Express Milk Bank) donor human milk banking had not occurred in Australia for the past 20 years. In re-establishing donor human milk banking in Australia, the focus of the PREM Bank has been to develop a formal and consistent approach to safety and quality in processing during the operation of the human milk bank. There is currently no existing legislation in Australia that specifically regulates the operation of donor human milk banks. For this reason the PREM Bank has utilised existing and internationally recognised management practices for managing hazards during food production. These tools (specifically HACCP) have been used to guide the development of Standard Operating Procedures and Good Manufacturing Practice for the screening of donors and processing of donor human milk. Donor screening procedures are consistent with those recommended by other human milk banks operating internationally, and also consistent with the requirements for blood and tissue donation in Australia. Controlled documentation and record keep requirements have also been developed that allow complete traceability from individual donation to individual feed dispensed to recipient and maintain a record of all processing and storage conditions. These operational requirements have been developed to reduce any risk associated with feeding pasteurised donor human milk to hospitalised preterm or ill infants to acceptable levels.
Standard operating procedures for clinical research departments.
Kee, Ashley Nichole
2011-01-01
A set of standard operating procedures (SOPs) provides a clinical research department with clear roles, responsibilities, and processes to ensure compliance, accuracy, and timeliness of data. SOPs also serve as a standardized training program for new employees. A practice may have an employee that can assist in the development of SOPs. There are also consultants that specialize in working with a practice to develop and write practice-specific SOPs. Making SOPs a priority will save a practice time and money in the long run and make the research practice more attractive to corporate study sponsors.
Tsibikov, V B; Ragozin, S I; Mikheeva, L V
1985-01-01
A flow-chart is developed demonstrating the relation between medical and prophylactic institutions within the organizational structure of the rehabilitation system and main types of rehabilitation procedures. In order to ascertain the priority in equipping rehabilitation services with adequate hardware the special priority criterion is introduced. The highest priority is assigned to balneotherapeutic and fangotherapeutic services. Based on the operation-by-operation analysis of clinical processes related to service and performance of balneologic procedures the preliminary set of clinical devices designed for baths, basins and showers in hospitals and rehabilitation departments is defined in a generalized form.
2014-10-01
process will help to harmonize important work on cyber policy and procedures within NATO and at the national level to ensure that the Alliance’s...conducts and practices its Emergency Action Procedures to defend the nation through interagency emergency cyber pro- cedures. During these conferences...via cyberspace, and does so in compliance with all applicable laws, policies, and procedures . The conduct of all U.S. intelligence operations is 64
Erten-Unal, M; Gelderloos, A B; Hughes, J S
1998-07-30
A Toxicity Reduction Evaluation (TRE) was conducted on the oily wastewater treatment plant (Plant) at a Naval Fuel Depot. The Plant treats ship and ballast wastes, berm water from fuel storage areas and wastes generated in the fuel reclamation plant utilizing physical/chemical treatment processes. In the first period of the project (Period I), the TRE included chemical characterization of the plant wastewaters, monitoring the final effluent for acute toxicity and a thorough evaluation of each treatment process and Plant operating procedures. Toxicity Identification Evaluation (TIE) procedures were performed as part of the overall TRE to characterize and identify possible sources of toxicity. Several difficulties were encountered because the effluent was saline, test organisms were marine species and toxicity was sporadic and unpredictable. The treatability approach utilizing enhancements, improved housekeeping, and operational changes produced substantial reductions in the acute toxicity of the final effluent. In the second period (Period II), additional acute toxicity testing and chemical characterization were performed through the Plant to assess the long-term effects of major unit process improvements for the removal of toxicity. The TIE procedures were also modified for saline wastewaters to focus on suspected class of toxicants such as surfactants. The TRE was successful in reducing acute toxicity of the final effluent through process improvements and operational modifications. The results indicated that the cause of toxicity was most likely due to combination of pollutants (matrix effect) rather than a single pollutant.
7 CFR 58.634 - Assembling and combining mix ingredients.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 3 2014-01-01 2014-01-01 false Assembling and combining mix ingredients. 58.634... Service 1 Operations and Operating Procedures § 58.634 Assembling and combining mix ingredients. The assembling and combining of mix ingredients for processing shall be in accordance with clean and sanitary...
7 CFR 58.634 - Assembling and combining mix ingredients.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 3 2012-01-01 2012-01-01 false Assembling and combining mix ingredients. 58.634... Service 1 Operations and Operating Procedures § 58.634 Assembling and combining mix ingredients. The assembling and combining of mix ingredients for processing shall be in accordance with clean and sanitary...
7 CFR 58.634 - Assembling and combining mix ingredients.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 3 2013-01-01 2013-01-01 false Assembling and combining mix ingredients. 58.634... Service 1 Operations and Operating Procedures § 58.634 Assembling and combining mix ingredients. The assembling and combining of mix ingredients for processing shall be in accordance with clean and sanitary...
Systems Management of Air Force Standard Communications-Computer systems: There is a Better Way
1988-04-01
upgrade or replacement of systems. AFR 700-6, Information Systems Operation Management , AFR 700-7, Information Processing Center Opera- tions Management...and AFR 700-8, Telephone Systems Operation Management provide USAF guidance, policy and procedures governing this phase. 4 2. 800-Series Regulations
Flying SATS Higher Volume Operations: Training, Lessons Learned, and Pilots' Experiences
NASA Technical Reports Server (NTRS)
Conway, Sheila; Williams, Dan; Adams, Catherine; Consiglio, Maria; Murdoch, Jennifer
2005-01-01
Developments in aviation, including new surveillance technologies and quicker, more economical small aircraft, have been identified as driving factors in a potential expansion of the use of non-towered, non-radar airports. The Small Aircraft Transportation System (SATS) project has developed the Higher Volume Operations (HVO) concept that enables pilots to safely arrive and depart these airports in instrument conditions at an increased rate as compared to today's procedures. This is achieved by transferring some traffic management tasks to centralized, ground-based automation, while assigning others to participating pilots aided by on-board tools. This paper describes strategies and lessons learned while training pilots to fly these innovative operations. Pilot approaches to using the experimental displays and dynamic altering systems during training are discussed. Potential operational benefits as well as pit-falls and frustrations expressed by subjects while learning to fly these new procedures are presented. Generally, pilots were comfortable with the procedures and the training process, and expressed interest in its near-term implementation.
Fundamental procedures of geographic information analysis
NASA Technical Reports Server (NTRS)
Berry, J. K.; Tomlin, C. D.
1981-01-01
Analytical procedures common to most computer-oriented geographic information systems are composed of fundamental map processing operations. A conceptual framework for such procedures is developed and basic operations common to a broad range of applications are described. Among the major classes of primitive operations identified are those associated with: reclassifying map categories as a function of the initial classification, the shape, the position, or the size of the spatial configuration associated with each category; overlaying maps on a point-by-point, a category-wide, or a map-wide basis; measuring distance; establishing visual or optimal path connectivity; and characterizing cartographic neighborhoods based on the thematic or spatial attributes of the data values within each neighborhood. By organizing such operations in a coherent manner, the basis for a generalized cartographic modeling structure can be developed which accommodates a variety of needs in a common, flexible and intuitive manner. The use of each is limited only by the general thematic and spatial nature of the data to which it is applied.
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2010 CFR
2010-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2011 CFR
2011-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2012 CFR
2012-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2014 CFR
2014-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2013 CFR
2013-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
Ozel, Bora; Sezgin, Billur; Guney, Kirdar; Latifoglu, Osman; Celebi, Cemallettin
2015-02-01
Although aesthetic procedures are known to have a higher impact on women, men are becoming more inclined toward such procedures since the last decade. To determine the reason behind the increase in demand for male aesthetic procedures and to learn about the expectations and inquietude related to body contouring surgery, a prospective questionnaire study was conducted on 200 Turkish males from January 1, 2011-May 31, 2012. Demographic information, previous aesthetic procedures and thoughts on body contouring procedures with given reasons were questioned. The results of the study showed that 53 % of all participants considered undergoing body contouring surgery with the given reason that they believed their current body structure required it. For those who did not consider contouring operations, 92.5 % said they felt that they did not need such a procedure. The results of the statistical analysis showed that BMI was a significant factor in the decision making process for wanting to undergo body contouring procedures. The results of the study showed that men's consideration for aesthetic operations depends mainly on necessity and that the most considered region was the abdominal zone in regard to contouring. We can conclude that men are becoming more interested in body contouring operations and therefore different surgical procedures should be refined and re-defined according to the expectations of this new patient group.
Information processing requirements for on-board monitoring of automatic landing
NASA Technical Reports Server (NTRS)
Sorensen, J. A.; Karmarkar, J. S.
1977-01-01
A systematic procedure is presented for determining the information processing requirements for on-board monitoring of automatic landing systems. The monitoring system detects landing anomalies through use of appropriate statistical tests. The time-to-correct aircraft perturbations is determined from covariance analyses using a sequence of suitable aircraft/autoland/pilot models. The covariance results are used to establish landing safety and a fault recovery operating envelope via an event outcome tree. This procedure is demonstrated with examples using the NASA Terminal Configured Vehicle (B-737 aircraft). The procedure can also be used to define decision height, assess monitoring implementation requirements, and evaluate alternate autoland configurations.
NASA Technical Reports Server (NTRS)
Chien, S.
1994-01-01
This paper describes work on the Multimission VICAR Planner (MVP) system to automatically construct executable image processing procedures for custom image processing requests for the JPL Multimission Image Processing Lab (MIPL). This paper focuses on two issues. First, large search spaces caused by complex plans required the use of hand encoded control information. In order to address this in a manner similar to that used by human experts, MVP uses a decomposition-based planner to implement hierarchical/skeletal planning at the higher level and then uses a classical operator based planner to solve subproblems in contexts defined by the high-level decomposition.
Macroergonomic study of food sector company distribution centres.
García Acosta, Gabriel; Lange Morales, Karen
2008-07-01
This study focussed on the work system design to be used by a Colombian food sector company for distributing products. It considered the concept of participative ergonomics, where people from the commercial, logistics, operation, occupational health areas worked in conjunction with the industrial designers, ergonomists who methodologically led the project. As a whole, the project was conceived as having five phases: outline, diagnosis, modelling the process, scalability, instrumentation. The results of the project translate into procedures for selecting, projecting a new distribution centre, the operational process model, a description of ergonomic systems that will enable specific work stations to be designed, the procedure for adapting existing warehouses. Strategically, this work helped optimise the company's processes and ensure that knowledge would be transferred within it. In turn, it became a primary prevention strategy in the field of health, aimed at reducing occupational risks, improving the quality of life at work.
High efficiency endocrine operation protocol: From design to implementation.
Mascarella, Marco A; Lahrichi, Nadia; Cloutier, Fabienne; Kleiman, Simcha; Payne, Richard J; Rosenberg, Lawrence
2016-10-01
We developed a high efficiency endocrine operative protocol based on a mathematical programming approach, process reengineering, and value-stream mapping to increase the number of operations completed per day without increasing operating room time at a tertiary-care, academic center. Using this protocol, a case-control study of 72 patients undergoing endocrine operation during high efficiency days were age, sex, and procedure-matched to 72 patients undergoing operation during standard days. The demographic profile, operative times, and perioperative complications were noted. The average number of cases per 8-hour workday in the high efficiency and standard operating rooms were 7 and 5, respectively. Mean procedure times in both groups were similar. The turnaround time (mean ± standard deviation) in the high efficiency group was 8.5 (±2.7) minutes as compared with 15.4 (±4.9) minutes in the standard group (P < .001). Transient postoperative hypocalcemia was 6.9% (5/72) and 8.3% (6/72) for the high efficiency and standard groups, respectively (P = .99). In this study, patients undergoing high efficiency endocrine operation had similar procedure times and perioperative complications compared with the standard group. The proposed high efficiency protocol seems to better utilize operative time and decrease the backlog of patients waiting for endocrine operation in a country with a universal national health care program. Copyright © 2016 Elsevier Inc. All rights reserved.
Giordano, Anna; Barresi, Antonello A; Fissore, Davide
2011-01-01
The aim of this article is to show a procedure to build the design space for the primary drying of a pharmaceuticals lyophilization process. Mathematical simulation of the process is used to identify the operating conditions that allow preserving product quality and meeting operating constraints posed by the equipment. In fact, product temperature has to be maintained below a limit value throughout the operation, and the sublimation flux has to be lower than the maximum value allowed by the capacity of the condenser, besides avoiding choking flow in the duct connecting the drying chamber to the condenser. Few experimental runs are required to get the values of the parameters of the model: the dynamic parameters estimation algorithm, an advanced tool based on the pressure rise test, is used to this purpose. A simple procedure is proposed to take into account parameters uncertainty and, thus, it is possible to find the recipes that allow fulfilling the process constraints within the required uncertainty range. The same approach can be effective to take into account the heterogeneity of the batch when designing the freeze-drying recipe. Copyright © 2010 Wiley-Liss, Inc. and the American Pharmacists Association
NASA Technical Reports Server (NTRS)
Stetson, Howard K.; Haddock, Angie T.; Frank, Jeremy; Cornelius, Randy; Wang, Lui; Garner, Larry
2015-01-01
NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). Utilization of Draper Laboratory's Timeliner software, deployed on-board the ISS within the Command and Control (C&C) computers and the Payload computers, allowed development of the automated procedures specific to ISS without having to certify and employ novel software for procedure development and execution. The procedures contained the ground procedure logic and actions as possible to include fault detection and recovery capabilities. The autonomous operations concept includes a reduction of the amount of data a crew operator is required to verify during activation or de-activation, as well as integration of procedure execution status and relevant data in a single integrated display. During execution, the auto-procedures (via Timerliner) provide a step-by-step messaging paradigm and a high-level status upon termination. This messaging and high-level status is the only data generated for operator display. To enhance situational awareness of the operator, the Web-based Procedure Display (WebPD) provides a novel approach to the issues of procedure display and execution tracking. WebPD is a web based application that serves as the user interface for electronic procedure execution. It incorporates several aspects of the HTML5 standard. Procedures are written in a dialect of XML called Procedure Representation Language (PRL). WebPD tracks execution status in the procedure or procedures being displayed. WebPD aggregates and simplifies the auto-sequence execution status information, and formatted to be easily followed and understood by an operator who is not dedicated to actively monitoring the task. WebPD also provides an integrated data and control interface to pause or halt the execution in order to provide a check point of operation and to examine progress before starting the next sequence of activities. For this demonstration, the procedure was initiated and monitored from the ground. As the Timeliner sequences executed, their high-level execution status was written to PLMDM memory. This memory is read and downlinked via Ku-Band at a 1 Hz rate. The data containing the high-level execution status is de-commutated on the ground, and rebroadcast for WebPD consumption. A future demonstration will be performed onboard, with ISS astronauts initiating the operations instead of ground controllers. The AMO EXPRESS experiment demonstrated activation and de-activation of EXPRESS rack 7, providing the capability of future single button activations and deactivations of facility class racks. The experiment achieved numerous technical and operations 'firsts' for the ISS
Developing a preservation policy and procedure statement for a health sciences library.
Paulson, B A
1989-01-01
The preconditions for creating a preservation policy document in a health sciences library are an existing preservation policy for the institution of which it is a part and administrative support for preservation. The assumption underlying preservation activity, from the formulation of general guidelines to the detail of operating procedure, is that collection development and preservation are complementary functions. Documentation of operational procedures in some detail should be a part of the statement. Since preservation activity cuts across functional library structures, all management staff should be involved in the planning process and be made aware of their responsibilities. The creation of a preservation policy statement will highlight unaddressed issues, procedural inadequacies, and differences in staff perceptions of priorities, but a written statement provides a framework for setting priorities and making decisions. PMID:2758183
This procedure describes the process for collecting and analyzing blood and urine samples. The presence of chemical contaminants in biological specimens such as blood, urine, and hair represent a measure of the internal dose or body burden for a given individual derived from the ...
The purpose of this SOP is to describe this sub-routine within the overall field data flow and custody plan. Its purpose is to establish a uniform procedure for the tracking of physical field forms and questionnaires while at keypunch. It applies to all data processing batches ...
The purpose of this SOP is to describe the flow and custody of laboratory data generated by NHEXAS Arizona through data processing and delivery to the project data manager for creation of the master database. This procedure was followed to ensure consistent data retrieval during...
Process Design Manual for Land Treatment of Municipal Wastewater.
ERIC Educational Resources Information Center
Crites, R.; And Others
This manual presents a procedure for the design of land treatment systems. Slow rate, rapid infiltration, and overland flow processes for the treatment of municipal wastewaters are given emphasis. The basic unit operations and unit processes are discussed in detail, and the design concepts and criteria are presented. The manual includes design…
40 CFR 63.8005 - What requirements apply to my process vessels?
Code of Federal Regulations, 2011 CFR
2011-07-01
... condensers, as defined in § 63.1251, are not considered to be control devices for process vessels. (d... vessels. (2) For the initial compliance demonstration for condensers, you must determine uncontrolled... process condenser is properly operated according to the procedures specified in § 63.1257(d)(2)(i)(C)(4...
Analytical control test plan and microbiological methods for the water recovery test
NASA Technical Reports Server (NTRS)
Traweek, M. S. (Editor); Tatara, J. D. (Editor)
1994-01-01
Qualitative and quantitative laboratory results are important to the decision-making process. In some cases, they may represent the only basis for deciding between two or more given options or processes. Therefore, it is essential that handling of laboratory samples and analytical operations employed are performed at a deliberate level of conscientious effort. Reporting erroneous results can lead to faulty interpretations and result in misinformed decisions. This document provides analytical control specifications which will govern future test procedures related to all Water Recovery Test (WRT) Phase 3 activities to be conducted at the National Aeronautics and Space Administration/Marshall Space Flight Center (NASA/MSFC). This document addresses the process which will be used to verify analytical data generated throughout the test period, and to identify responsibilities of key personnel and participating laboratories, the chains of communication to be followed, and ensure that approved methodology and procedures are used during WRT activities. This document does not outline specifics, but provides a minimum guideline by which sampling protocols, analysis methodologies, test site operations, and laboratory operations should be developed.
Sheldon, Elizabeth; Vo, Kim Chi; McIntire, Ramsey A; Aghajanova, Lusine; Zelenko, Zara; Irwin, Juan C; Giudice, Linda C
2011-05-01
To develop a standard operating procedure (SOP) for collection, transport, storage of human endometrial tissue and blood samples, subject and specimen annotation, and establishing sample priorities. The SOP synthesizes sound scientific procedures, the literature on ischemia research, sample collection and gene expression profiling, good laboratory practices, and the authors' experience of workflow and sample quality. The National Institutes of Health, University of California, San Francisco, Human Endometrial Tissue and DNA Bank. Women undergoing endometrial biopsy or hysterectomy for nonmalignant indications. Collecting, processing, storing, distributing endometrial tissue and blood samples under approved institutional review board protocols and written informed consent from participating subjects. Standard operating procedure. The SOP addresses rigorous and consistent subject annotation, specimen processing and characterization, strict regulatory compliance, and a reference for researchers to track collection and storage times that may influence their research. The comprehensive and systematic approach to the procurement of human blood and endometrial tissue in this SOP ensures the high quality, reliability, and scientific usefulness of biospecimens made available to investigators by the National Institutes of Health, University of California, San Francisco, Human Endometrial Tissue and DNA Bank. The detail and perspective in this SOP also provides a blueprint for implementation of similar collection programs at other institutions. Copyright © 2011 American Society for Reproductive Medicine. Published by Elsevier Inc. All rights reserved.
Refractory Metal Heat Pipe Life Test - Test Plan and Standard Operating Procedures
NASA Technical Reports Server (NTRS)
Martin, J. J.; Reid, R. S.
2010-01-01
Refractory metal heat pipes developed during this project shall be subjected to various operating conditions to evaluate life-limiting corrosion factors. To accomplish this objective, various parameters shall be investigated, including the effect of temperature and mass fluence on long-term corrosion rate. The test series will begin with a performance test of one module to evaluate its performance and to establish the temperature and power settings for the remaining modules. The performance test will be followed by round-the-clock testing of 16 heat pipes. All heat pipes shall be nondestructively inspected at 6-month intervals. At longer intervals, specific modules will be destructively evaluated. Both the nondestructive and destructive evaluations shall be coordinated with Los Alamos National Laboratory. During the processing, setup, and testing of the heat pipes, standard operating procedures shall be developed. Initial procedures are listed here and, as hardware is developed, will be updated, incorporating findings and lessons learned.
Analyzing the test process using structural coverage
NASA Technical Reports Server (NTRS)
Ramsey, James; Basili, Victor R.
1985-01-01
A large, commercially developed FORTRAN program was modified to produce structural coverage metrics. The modified program was executed on a set of functionally generated acceptance tests and a large sample of operational usage cases. The resulting structural coverage metrics are combined with fault and error data to evaluate structural coverage. It was shown that in the software environment the functionally generated tests seem to be a good approximation of operational use. The relative proportions of the exercised statement subclasses change as the structural coverage of the program increases. A method was also proposed for evaluating if two sets of input data exercise a program in a similar manner. Evidence was provided that implies that in this environment, faults revealed in a procedure are independent of the number of times the procedure is executed and that it may be reasonable to use procedure coverage in software models that use statement coverage. Finally, the evidence suggests that it may be possible to use structural coverage to aid in the management of the acceptance test processed.
40 CFR 240.205-3 - Recommended procedures: Operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended... excessive emissions, appropriate adjustments should be made to lower the emission to acceptable levels. ...
77 FR 61400 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-09
... military imagery as part of their standard operating procedure. The completed form allows the respondents... and equipment for commercial purposes. The form prescribes processes/standards that have been...
The DACUM Job Analysis Process.
ERIC Educational Resources Information Center
Dofasco, Inc., Hamilton (Ontario).
This document explains the DACUM (Developing A Curriculum) process for analyzing task-based jobs to: identify where standard operating procedures are required; identify duplicated low value added tasks; develop performance standards; create job descriptions; and identify the elements that must be included in job-specific training programs. The…
9 CFR 318.302 - Thermal processing.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Thermal processing. 318.302 Section 318.302 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... retort come-up operating procedures and critical factors. (2) Letters or other written communications...
Computer-aided operations engineering with integrated models of systems and operations
NASA Technical Reports Server (NTRS)
Malin, Jane T.; Ryan, Dan; Fleming, Land
1994-01-01
CONFIG 3 is a prototype software tool that supports integrated conceptual design evaluation from early in the product life cycle, by supporting isolated or integrated modeling, simulation, and analysis of the function, structure, behavior, failures and operation of system designs. Integration and reuse of models is supported in an object-oriented environment providing capabilities for graph analysis and discrete event simulation. Integration is supported among diverse modeling approaches (component view, configuration or flow path view, and procedure view) and diverse simulation and analysis approaches. Support is provided for integrated engineering in diverse design domains, including mechanical and electro-mechanical systems, distributed computer systems, and chemical processing and transport systems. CONFIG supports abstracted qualitative and symbolic modeling, for early conceptual design. System models are component structure models with operating modes, with embedded time-related behavior models. CONFIG supports failure modeling and modeling of state or configuration changes that result in dynamic changes in dependencies among components. Operations and procedure models are activity structure models that interact with system models. CONFIG is designed to support evaluation of system operability, diagnosability and fault tolerance, and analysis of the development of system effects of problems over time, including faults, failures, and procedural or environmental difficulties.
Assay optimisation and technology transfer for multi-site immuno-monitoring in vaccine trials
Harris, Stephanie A.; Satti, Iman; Bryan, Donna; Walker, K. Barry; Dockrell, Hazel M.; McShane, Helen; Ho, Mei Mei
2017-01-01
Cellular immunological assays are important tools for the monitoring of responses to T-cell-inducing vaccine candidates. As these bioassays are often technically complex and require considerable experience, careful technology transfer between laboratories is critical if high quality, reproducible data that allows comparison between sites, is to be generated. The aim of this study, funded by the European Union Framework Program 7-funded TRANSVAC project, was to optimise Standard Operating Procedures and the technology transfer process to maximise the reproducibility of three bioassays for interferon-gamma responses: enzyme-linked immunosorbent assay (ELISA), ex-vivo enzyme-linked immunospot and intracellular cytokine staining. We found that the initial variability in results generated across three different laboratories reduced following a combination of Standard Operating Procedure harmonisation and the undertaking of side-by-side training sessions in which assay operators performed each assay in the presence of an assay ‘lead’ operator. Mean inter-site coefficients of variance reduced following this training session when compared with the pre-training values, most notably for the ELISA assay. There was a trend for increased inter-site variability at lower response magnitudes for the ELISA and intracellular cytokine staining assays. In conclusion, we recommend that on-site operator training is an essential component of the assay technology transfer process and combined with harmonised Standard Operating Procedures will improve the quality, reproducibility and comparability of data produced across different laboratories. These data may be helpful in ongoing discussions of the potential risk/benefit of centralised immunological assay strategies for large clinical trials versus decentralised units. PMID:29020010
Biospecimen Core Resource - TCGA
The Cancer Genome Atlas (TCGA) Biospecimen Core Resource centralized laboratory reviews and processes blood and tissue samples and their associated data using optimized standard operating procedures for the entire TCGA Research Network.
The Design and Implementation of INGRES.
ERIC Educational Resources Information Center
Stonebraker, Michael; And Others
The currently operational version of the INGRES data base management system gives a relational view of data, supports two high level, non-procedural data sublanguages, and runs as a collection of user processes on top of a UNIX operating system. The authors stress the design decisions and tradeoffs in relation to (1) structuring the system into…
Modeling of dialogue regimes of distance robot control
NASA Astrophysics Data System (ADS)
Larkin, E. V.; Privalov, A. N.
2017-02-01
Process of distance control of mobile robots is investigated. Petri-Markov net for modeling of dialogue regime is worked out. It is shown, that sequence of operations of next subjects: a human operator, a dialogue computer and an onboard computer may be simulated with use the theory of semi-Markov processes. From the semi-Markov process of the general form Markov process was obtained, which includes only states of transaction generation. It is shown, that a real transaction flow is the result of «concurrency» in states of Markov process. Iteration procedure for evaluation of transaction flow parameters, which takes into account effect of «concurrency», is proposed.
Data Elements for Workload Analysis of Armored Vehicle Crews
1990-09-01
weapon status, terrain, enemy, etc.) and 2) managing the operation of the various mental processes through which the operator interacts with the...contrive, or plan a process or procedure for carrying out a tactical action. DICTATE - To speak aloud into a recorder. DIRECT - To manage the action of...To mark or note on a map or chart; to locate by means of coordinates. POSITION - To place oneself or others in a location or posture. PREPARE - To
1988-03-01
PACKAGE BODY ) TLCSC P661 (CATALOG #P106-0) This package contains the CAMP parts required to do the vaypoint steering portion of navigation. The...3.3.4.1.6 PROCESSING The following describes the processing performed by this part: package body WaypointSteering is package body ...Steering_Vector_Operations is separate; package body Steering_Vector_Operations_with_Arcsin is separate; procedure Compute Turn_Angle_and Direction (UnitNormal C
a Novel Image Acquisition and Processing Procedure for Fast Tunnel Dsm Production
NASA Astrophysics Data System (ADS)
Roncella, R.; Umili, G.; Forlani, G.
2012-07-01
In mining operations the evaluation of the stability condition of the excavated front are critic to ensure a safe and correct planning of the subsequent activities. The procedure currently used to this aim has some shortcomings: safety for the geologist, completeness of data collection and objective documentation of the results. In the last decade it has been shown that the geostructural parameters necessary to the stability analysis can be derived from high resolution digital surface models (DSM) of rock faces. With the objective to overcome the limitation of the traditional survey and to minimize data capture times, so reducing delays on mining site operations, a photogrammetric system to generate high resolution DSM of tunnels has been realized. A fast, effective and complete data capture method has been developed and the orientation and restitution phases have been largely automated. The survey operations take no more than required to the traditional ones; no additional topographic measurements other than those available are required. To make the data processing fast and economic our Structure from Motion procedure has been slightly modified to adapt to the peculiar block geometry while, the DSM of the tunnel is created using automatic image correlation techniques. The geomechanical data are sampled on the DSM, by using the acquired images in a GUI and a segmentation procedure to select discontinuity planes. To allow an easier and faster identification of relevant features of the surface of the tunnel, using again an automatic procedure, an orthophoto of the tunnel is produced. A case study where a tunnel section of ca. 130 m has been surveyed is presented.
40 CFR 63.1323 - Batch process vents-methods and procedures for group determination.
Code of Federal Regulations, 2010 CFR
2010-07-01
... accepted chemical engineering principles, measurable process parameters, or physical or chemical laws or... recovering monomer, reaction products, by-products, or solvent from a stripper operated in batch mode, and the primary condenser recovering monomer, reaction products, by-products, or solvent from a...
NASA Wallops Flight Center GEOS-3 altimeter data processing report
NASA Technical Reports Server (NTRS)
Stanley, H. R.; Dwyer, R. E.
1980-01-01
The procedures used to process the GEOS-3 radar altimeter data from raw telemetry data to a final user data product are described. In addition, the radar altimeter hardware design and operating parameters are presented to aid the altimeter user in understanding the altimeter data.
ERIC Educational Resources Information Center
Air Univ., Gunter AFS, Ala. Extension Course Inst.
This student text is designed for use by Air Force personnel enrolled in a self-study extension course for meat cutters. Covered in the individual chapters are careers in meat processing, operation and maintenance of meat cutting equipment, receipt and storage, procedures for processing and preparing meats, techniques for wrapping and pricing…
The purpose of this SOP is to outline the process of field quality assurance and quality control checks. This procedure was followed to ensure consistent data retrieval during the Arizona NHEXAS project and the Border study. Keywords: custody; QA/QC; field checks.
The U.S.-Mex...
The purpose of this SOP is to describe the flow and custody of laboratory data generated by the Arizona Border Study through data processing and delivery to the project data manager for creation of the master database. This procedure was followed to ensure consistent data retrie...
The purpose of this SOP is to describe this sub-routine within the overall field data flow and custody plan. Its purpose is to establish a uniform procedure for the tracking of physical field forms and questionnaires while at keypunch. It applies to all data processing batches ...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-10
... governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires participants to submit and serve all... accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at...
Automated Chromium Plating Line for Gun Barrels
1979-09-01
consistent pretreatments and bath dwell times. Some of the advantages of automated processing include increased productivity (average of 20^) due to...when automated processing procedures’ are used. The current method of applying chromium electrodeposits to gun tubes is a manual, batch operation...currently practiced with rotary swaged gun tubes would substantially reduce the difficulties in automated processing . RECOMMENDATIONS
Cable Television: The Process of Franchising.
ERIC Educational Resources Information Center
Johnson, Leland L.; Botein, Michael
In an effort to insure that cable television franchising procedures at the local level are based on a competitive and well-conceived selection process, this report discusses some of the most important steps of the franchising process. Not only does it show how the community should assess its needs and appraise the merits of the cable operator, but…
Edwards, Janet P; Schofield, Adam; Paolucci, Elizabeth Oddone; Schieman, Colin; Kelly, Elizabeth; Servatyari, Ramin; Dixon, Elijah; Ball, Chad G; Grondin, Sean C
2014-01-01
To identify core thoracic surgery procedures that require increased emphasis during thoracic surgery residency for residents to achieve operative independence and to compare the perspectives of residents and program directors in this regard. A modified Delphi process was used to create a survey that was distributed electronically to all Canadian thoracic surgery residents (12) and program directors (8) addressing the residents' ability to perform 19 core thoracic surgery procedures independently after the completion of residency. Residents were also questioned about the adequacy of their operative exposure to these 19 procedures during their residency training. A descriptive summary including calculations of frequencies and proportions was conducted. The perceptions of the 2 groups were then compared using the Fisher exact test employing a Bonferroni correction. The relationship between residents' operative exposure and their perceived operative ability was explored in the same fashion. The response rate was 100% for residents and program directors. No statistical differences were found between residents' and program directors' perceptions of residents' ability to perform the 19 core procedures independently. Both groups identified lung transplantation, first rib resection, and extrapleural pneumonectomy as procedures for which residents were not adequately prepared to perform independently. Residents' subjective ratings of operative exposure were in good agreement with their reported operative ability for 13 of 19 procedures. This study provides new insight into the perceptions of thoracic surgery residents and their program directors regarding operative ability. This study points to good agreement between residents and program directors regarding residents' surgical capabilities. This study provides information regarding potential weaknesses in thoracic surgery training, which may warrant an examination of the curricula of existing programs as well as a reconsideration of what the scope of practice of a general thoracic surgeon should entail. © 2013 Published by Association of Program Directors in Surgery on behalf of Association of Program Directors in Surgery.
NASA Technical Reports Server (NTRS)
Magness, E. R. (Principal Investigator)
1980-01-01
The success of the Transition Year procedure to separate and label barley and the other small grains was assessed. It was decided that developers of the procedure would carry out the exercise in order to prevent compounding procedural problems with implementation problems. The evaluation proceeded by labeling the sping small grains first. The accuracy of this labeling was, on the average, somewhat better than that in the Transition Year operations. Other departures from the original procedure included a regionalization of the labeling process, the use of trend analysis, and the removal of time constraints from the actual processing. Segment selection, ground truth derivation, and data available for each segment in the analysis are discussed. Labeling accuracy is examined for North Dakota, South Dakota, Minnesota, and Montana as well as for the entire four-state area. Errors are characterized.
Dosimetry procedures for an industrial irradiation plant
NASA Astrophysics Data System (ADS)
Grahn, Ch.
Accurate and reliable dosimetry procedures constitute a very important part of process control and quality assurance at a radiation processing plant. γ-Dose measurements were made on the GBS 84 irradiator for food and other products on pallets or in containers. Chemical dosimeters wre exposed in the facility under conditions of the typical plant operation. The choice of the dosimeter systems employed was based on the experience in chemical dosimetry gained over several years. Dose uniformity information was obtained in air, spices, bulbs, feeds, cosmetics, plastics and surgical goods. Most products currently irradiated require dose uniformity which can be efficiently provided by pallet or box irradiators like GBS 84. The radiation performance characteristics and some dosimetry procedures are discussed.
40 CFR 240.204-3 - Recommended procedures: Operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended... acceptable levels. (b) In the event of an accidental spill, the local regulatory agency should be notified...
40 CFR 240.201-3 - Recommended procedures: Operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended... precautions to be taken if unacceptable wastes are delivered to the facility or are improperly left there...
40 CFR 240.201-3 - Recommended procedures: Operations.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended... precautions to be taken if unacceptable wastes are delivered to the facility or are improperly left there...
The Behavioral Economics of Choice and Interval Timing
Jozefowiez, J.; Staddon, J. E. R.; Cerutti, D. T.
2009-01-01
We propose a simple behavioral economic model (BEM) describing how reinforcement and interval timing interact. The model assumes a Weber-law-compliant logarithmic representation of time. Associated with each represented time value are the payoffs that have been obtained for each possible response. At a given real time, the response with the highest payoff is emitted. The model accounts for a wide range of data from procedures such as simple bisection, metacognition in animals, economic effects in free-operant psychophysical procedures and paradoxical choice in double-bisection procedures. Although it assumes logarithmic time representation, it can also account for data from the time-left procedure usually cited in support of linear time representation. It encounters some difficulties in complex free-operant choice procedures, such as concurrent mixed fixed-interval schedules as well as some of the data on double bisection, that may involve additional processes. Overall, BEM provides a theoretical framework for understanding how reinforcement and interval timing work together to determine choice between temporally differentiated reinforcers. PMID:19618985
An efficient parallel-processing method for transposing large matrices in place.
Portnoff, M R
1999-01-01
We have developed an efficient algorithm for transposing large matrices in place. The algorithm is efficient because data are accessed either sequentially in blocks or randomly within blocks small enough to fit in cache, and because the same indexing calculations are shared among identical procedures operating on independent subsets of the data. This inherent parallelism makes the method well suited for a multiprocessor computing environment. The algorithm is easy to implement because the same two procedures are applied to the data in various groupings to carry out the complete transpose operation. Using only a single processor, we have demonstrated nearly an order of magnitude increase in speed over the previously published algorithm by Gate and Twigg for transposing a large rectangular matrix in place. With multiple processors operating in parallel, the processing speed increases almost linearly with the number of processors. A simplified version of the algorithm for square matrices is presented as well as an extension for matrices large enough to require virtual memory.
Donation after cardiac death and the emergency department: ethical issues.
Simon, Jeremy R; Schears, Raquel M; Padela, Aasim I
2014-01-01
Organ donation after cardiac death (DCD) is increasingly considered as an option to address the shortage of organs available for transplantation, both in the United States and worldwide. The procedures for DCD differ from procedures for donation after brain death and are likely less familiar to emergency physicians (EPs), even as this process is increasingly involving emergency departments (EDs). This article explores the ED operational and ethical issues surrounding this procedure. © 2013 by the Society for Academic Emergency Medicine.
An iterative requirements specification procedure for decision support systems.
Brookes, C H
1987-08-01
Requirements specification is a key element in a DSS development project because it not only determines what is to be done, it also drives the evolution process. A procedure for requirements elicitation is described that is based on the decomposition of the DSS design task into a number of functions, subfunctions, and operators. It is postulated that the procedure facilitates the building of a DSS that is complete and integrates MIS, modelling and expert system components. Some examples given are drawn from the health administration field.
40 CFR 63.488 - Methods and procedures for batch front-end process vent group determination.
Code of Federal Regulations, 2010 CFR
2010-07-01
... engineering principles, measurable process parameters, or physical or chemical laws or properties. Examples of... primary condenser recovering monomer, reaction products, by-products, or solvent from a stripper operated in batch mode, and the primary condenser recovering monomer, reaction products, by-products, or...
40 CFR 98.333 - Calculating GHG emissions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Stationary Fuel Combustion Sources). (b) Calculate and report under this subpart the process CO2 emissions by... calculate and report the annual process CO2 emissions using the procedures specified in either paragraph (a... and combustion CO2 emissions by operating and maintaining a CEMS according to the Tier 4 Calculation...
40 CFR 98.333 - Calculating GHG emissions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Stationary Fuel Combustion Sources). (b) Calculate and report under this subpart the process CO2 emissions by... calculate and report the annual process CO2 emissions using the procedures specified in either paragraph (a... and combustion CO2 emissions by operating and maintaining a CEMS according to the Tier 4 Calculation...
40 CFR 98.333 - Calculating GHG emissions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Stationary Fuel Combustion Sources). (b) Calculate and report under this subpart the process CO2 emissions by... calculate and report the annual process CO2 emissions using the procedures specified in either paragraph (a... and combustion CO2 emissions by operating and maintaining a CEMS according to the Tier 4 Calculation...
Code of Federal Regulations, 2011 CFR
2011-07-01
... will communicate with the NSA person and serve as the contact point for the person and the process..., will be referred to the Visitor Control Center (VCC) at Operations Building 2A. The VCC will contact... process will not be accepted during non-duty hours unless prior arrangements have been made by the OGC...
Code of Federal Regulations, 2012 CFR
2012-07-01
... will communicate with the NSA person and serve as the contact point for the person and the process..., will be referred to the Visitor Control Center (VCC) at Operations Building 2A. The VCC will contact... process will not be accepted during non-duty hours unless prior arrangements have been made by the OGC...
Code of Federal Regulations, 2014 CFR
2014-07-01
... will communicate with the NSA person and serve as the contact point for the person and the process..., will be referred to the Visitor Control Center (VCC) at Operations Building 2A. The VCC will contact... process will not be accepted during non-duty hours unless prior arrangements have been made by the OGC...
Code of Federal Regulations, 2013 CFR
2013-07-01
... will communicate with the NSA person and serve as the contact point for the person and the process..., will be referred to the Visitor Control Center (VCC) at Operations Building 2A. The VCC will contact... process will not be accepted during non-duty hours unless prior arrangements have been made by the OGC...
Code of Federal Regulations, 2010 CFR
2010-07-01
... will communicate with the NSA person and serve as the contact point for the person and the process..., will be referred to the Visitor Control Center (VCC) at Operations Building 2A. The VCC will contact... process will not be accepted during non-duty hours unless prior arrangements have been made by the OGC...
Graphic Arts: Book Three. The Press and Related Processes.
ERIC Educational Resources Information Center
Farajollahi, Karim; And Others
The third of a three-volume set of instructional materials for a graphic arts course, this manual consists of nine instructional units dealing with presses and related processes. Covered in the units are basic press fundamentals, offset press systems, offset press operating procedures, offset inks and dampening chemistry, preventive maintenance…
1987-08-25
Department Of Computer Science University Of Utah Salt Lake City, UT 84112 August 25, 1987 C IO ,c Acessin Tor i Ifl G I . DTIC ?T3 0 ummouned 0C0 Juxtil t...generated for each instance of an alternative operation. One procedure merits special attention. CheckAndCommit(AltListr, g ): INTEGER is called by process P...in figure 2. CheckAndCommit uses a procedure CheckGuard(AltListr, g ): INTEGER that scans th, remote alternative list AltList7 looking for a matching
1983-12-30
support among the scientific community. In the absence of some agreed criteria, the economic impact and legal aspects could be overwhelming. _ 17 The...processing large numbers of people. Guidance on CCS operations needs to incl]ue release limits and procedures for receiptinq for articles held for...contaminated articles and the re-clothiny of personreJ. 5P ""N ~ ’aEMNON Better procedures and equipment with which to rapidly process large numbers of
Anaerobic sequencing batch reactors for wastewater treatment: a developing technology.
Zaiat, M; Rodrigues, J A; Ratusznei, S M; de Camargo, E F; Borzani, W
2001-01-01
This paper describes and discusses the main problems related to anaerobic batch and fed-batch processes for wastewater treatment. A critical analysis of the literature evaluated the industrial application viability and proposed alternatives to improve operation and control of this system. Two approaches were presented in order to make this anaerobic discontinuous process feasible for industrial application: (1) optimization of the operating procedures in reactors containing self-immobilized sludge as granules, and (2) design of bioreactors with inert support media for biomass immobilization.
242A Distributed Control System Year 2000 Acceptance Test Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEATS, M.C.
1999-08-31
This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct yearmore » 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.« less
Woodgate, Dawn
2006-06-01
Veterinary surgery provides an interesting context in which to address important questions about the links between formal 'book' learning and actual, personal experience of the phenomena in question, and to examine the processes through which these links are forged. Participant observation of surgical procedures suggests that surgeons initially learn about anatomy from books, pictures and demonstrations, and become skilled 'operators' through the application of enhancement and reduction procedures that have the effect of transforming the living body into something more closely resembling anatomical pictures of it. Some of these procedures can be seen as a set of formalized 'rules' for performing operations, and like most rules, they appear to decrease in importance as a surgeon gains experience. They may, however, regain importance when a practitioner meets with an anatomical variant that he or she has not previously encountered. Other practices appear to be less formalized, requiring creative, constructive use of visual aids or language practices outside formal textbook knowledge. The links between actual bodies (and operations) and textbook representations of them are thus formed within a community of 'operators'.
Operation plan for the data 100/LARS terminal system
NASA Technical Reports Server (NTRS)
Bowen, A. J., Jr.
1980-01-01
The Data 100/LARS terminal system provides an interface for processing on the IBM 3031 computer system at Purdue University's Laboratory for Applications of Remote Sensing. The environment in which the system is operated and supported is discussed. The general support responsibilities, procedural mechanisms, and training established for the benefit of the system users are defined.
ERIC Educational Resources Information Center
Carnegie, John W.
The rise time test (along with the settleometer procedure) is used to monitor sludge behavior in the secondary clarifier of an activated sludge system. The test monitors the effect of the nitrification/denitrification process and aids the operator in determining optimum clarifier sludge detention time and, to some extent, optimum degree of…
ERIC Educational Resources Information Center
Rhim, Lauren Morando
2005-01-01
Restructuring is a process initiated to substantively change the governance, operation and instruction of public schools or districts identified as failing. There are multiple definitions of restructuring, but the common thread binding all restructuring models is a substantive change of the standard operating procedures of a school or an entire…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... set forth in the First R&O, the Priority is premised on the unique ability of Tribes and Tribal... services the Tribal Priority generally operates as a dispositive preference in the application process... Tribal Priority operates as a dispositive preference in the AM commercial and FM NCE application contexts...
Procedural considerations for CPV outdoor power ratings per IEC 62670
NASA Astrophysics Data System (ADS)
Muller, Matthew; Kurtz, Sarah; Rodriguez, Jose
2013-09-01
The IEC Working Group 7 (WG7) is in the process of developing a draft procedure for an outdoor concentrating photovoltaic (CPV) module power rating at Concentrator Standard Operating Conditions (CSOC). WG7 recently achieved some consensus that using component reference cells to monitor/limit spectral variation is the preferred path for the outdoor power rating. To build on this consensus, the community must quantify these spectral limits and select a procedure for calculating and reporting a power rating. This work focuses on statistically comparing several procedures the community is considering in context with monitoring/limiting spectral variation.
Cabaleiro, Joe
2007-01-01
A key component of qualifying for accreditation with the Pharmacy Compounding Accreditation Board is having a set of comprehensive standard operating procedures that are being used by the pharmacy staff. The three criteria in standard operating procedures for which the Pharmacy Compounding Accreditation Board looks are: (1)written standard operating procedures; (2)standard operating procedures that reflect what the organization actualy does; and (3) whether the written standard operating procedures are implemented. Following specified steps in the preparation of standard operating procedures will result in procedures that meet Pharmacy Compounding Accreditation Board Requirements, thereby placing pharmacies one step closer to qualifying for accreditation.
40 CFR 792.81 - Standard operating procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 33 2013-07-01 2013-07-01 false Standard operating procedures. 792.81... operating procedures. (a) A testing facility shall have standard operating procedures in writing, setting... data generated in the course of a study. All deviations in a study from standard operating procedures...
40 CFR 792.81 - Standard operating procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 33 2012-07-01 2012-07-01 false Standard operating procedures. 792.81... operating procedures. (a) A testing facility shall have standard operating procedures in writing, setting... data generated in the course of a study. All deviations in a study from standard operating procedures...
40 CFR 792.81 - Standard operating procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 32 2014-07-01 2014-07-01 false Standard operating procedures. 792.81... operating procedures. (a) A testing facility shall have standard operating procedures in writing, setting... data generated in the course of a study. All deviations in a study from standard operating procedures...
Human Connectome Project Informatics: quality control, database services, and data visualization
Marcus, Daniel S.; Harms, Michael P.; Snyder, Abraham Z.; Jenkinson, Mark; Wilson, J Anthony; Glasser, Matthew F.; Barch, Deanna M.; Archie, Kevin A.; Burgess, Gregory C.; Ramaratnam, Mohana; Hodge, Michael; Horton, William; Herrick, Rick; Olsen, Timothy; McKay, Michael; House, Matthew; Hileman, Michael; Reid, Erin; Harwell, John; Coalson, Timothy; Schindler, Jon; Elam, Jennifer S.; Curtiss, Sandra W.; Van Essen, David C.
2013-01-01
The Human Connectome Project (HCP) has developed protocols, standard operating and quality control procedures, and a suite of informatics tools to enable high throughput data collection, data sharing, automated data processing and analysis, and data mining and visualization. Quality control procedures include methods to maintain data collection consistency over time, to measure head motion, and to establish quantitative modality-specific overall quality assessments. Database services developed as customizations of the XNAT imaging informatics platform support both internal daily operations and open access data sharing. The Connectome Workbench visualization environment enables user interaction with HCP data and is increasingly integrated with the HCP's database services. Here we describe the current state of these procedures and tools and their application in the ongoing HCP study. PMID:23707591
32 CFR 2004.20 - National Industrial Security Program Operating Manual (NISPOM) [201(a)].
Code of Federal Regulations, 2011 CFR
2011-07-01
... phases of the contracting process. (b) As a general rule, procedures for safeguarding classified information by contractors and recommendations for changes shall be addressed through the NISPOM coordination...
5 CFR 294.108 - Procedures for obtaining records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... identified by a technique or process that is not unreasonably burdensome or disruptive to OPM operations. (2... includes material published and offered for sale (e.g., by the Superintendent of Documents, Government...
77 FR 34460 - Proposed Collection; Comment Request for Form 14411
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-11
... problems may pertain to experiences with the Internal Revenue Service's processes procedures or make...) estimates of capital or start-up costs and costs of operation, maintenance, and purchase of services to...
Al-Hakim, Latif; Xiao, Jiaquan; Sengupta, Shomik
2017-12-01
The aim of this study is to examine operative flow disruption that occurs inside the surgical field, (internal operative flow disruption (OFD)), during urological laparoscopies, and to relate those events to external ergonomics environment in terms of monitor location, level of instruments' handles, and location of surgical team members. According to the our best knowledge, this is the first study of its kind. A combination of real and video-aided observational study was conducted in the operating rooms at hospitals in Australia and China. Brain storming sessions were first conducted to identify the main internal OFD events, and the observable reasons, potential external, and latent ergonomic factors were listed. A prospective observational study was then conducted. The observer's records and the related video records of internal surgical fields were analysed. Procedures were categorised into groups based on similarity in ergonomics environment. The mapping process revealed 39 types of internal OFD events resulted from six reasons. A total of 24 procedures were selected and arranged into two groups, each with twelve procedures. Group A was carried out under satisfactory ergonomics environment, while Group B was conducted under unsatisfactory ergonomics environment. A total of 1178 OFD events were detected delaying the total observed operative times (2966 min) by 220 min (7.43%). Average OFD/h in group A was less than 15, while in group B about 29 OFD/h. There are two main latent ergonomics factors affecting the surgeon's performance; non-physiological posture and long-period static posture. The delays and number of internal OFD were nearly doubled where procedures were conducted under unsatisfactory external ergonomics environment. Some events such as stopping operation and irrelevant conversations during long procedures may have a positive influence on the surgeon's performance.
NASA Technical Reports Server (NTRS)
Williams, David H.; Green, Steven M.
1993-01-01
Historically, development of airborne flight management systems (FMS) and ground-based air traffic control (ATC) systems has tended to focus on different objectives with little consideration for operational integration. A joint program, between NASA's Ames Research Center (Ames) and Langley Research Center (Langley), is underway to investigate the issues of, and develop systems for, the integration of ATC and airborne automation systems. A simulation study was conducted to evaluate a profile negotiation process (PNP) between the Center/TRACON Automation System (CTAS) and an aircraft equipped with a four-dimensional flight management system (4D FMS). Prototype procedures were developed to support the functional implementation of this process. The PNP was designed to provide an arrival trajectory solution which satisfies the separation requirements of ATC while remaining as close as possible to the aircraft's preferred trajectory. Results from the experiment indicate the potential for successful incorporation of aircraft-preferred arrival trajectories in the CTAS automation environment. Fuel savings on the order of 2 percent to 8 percent, compared to fuel required for the baseline CTAS arrival speed strategy, were achieved in the test scenarios. The data link procedures and clearances developed for this experiment, while providing the necessary functionality, were found to be operationally unacceptable to the pilots. In particular, additional pilot control and understanding of the proposed aircraft-preferred trajectory, and a simplified clearance procedure were cited as necessary for operational implementation of the concept.
How much can a single webcam tell to the operation of a water system?
NASA Astrophysics Data System (ADS)
Giuliani, Matteo; Castelletti, Andrea; Fedorov, Roman; Fraternali, Piero
2017-04-01
Recent advances in environmental monitoring are making a wide range of hydro-meteorological data available with a great potential to enhance understanding, modelling and management of environmental processes. Despite this progress, continuous monitoring of highly spatiotemporal heterogeneous processes is not well established yet, especially in inaccessible sites. In this context, the unprecedented availability of user-generated data on the web might open new opportunities for enhancing real-time monitoring and modeling of environmental systems based on data that are public, low-cost, and spatiotemporally dense. In this work, we focus on snow and contribute a novel crowdsourcing procedure for extracting snow-related information from public web images, either produced by users or generated by touristic webcams. A fully automated process fetches mountain images from multiple sources, identifies the peaks present therein, and estimates virtual snow indexes representing a proxy of the snow-covered area. The operational value of the obtained virtual snow indexes is then assessed for a real-world water-management problem, where we use these indexes for informing the daily control of a regulated lake supplying water for multiple purposes. Numerical results show that such information is effective in extending the anticipation capacity of the lake operations, ultimately improving the system performance. Our procedure has the potential for complementing traditional snow-related information, minimizing costs and efforts for obtaining the virtual snow indexes and, at the same time, maximizing the portability of the procedure to several locations where such public images are available.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lowes, Elizabeth A.
2012-07-01
Evaluating operational incidents can provide a window into the drivers most critical to establishing and maintaining a strong safety culture, thereby minimizing the potential project risk associated with safety incidents. By examining U.S. Department of Energy (DOE) versus U.S. Army drivers in terms of regulatory and contract requirements, programs implemented to address the requirements, and example case studies of operational events, a view of the elements most critical to making a positive influence on safety culture is presented. Four case studies are used in this evaluation; two from DOE and two from U.S. Army experiences. Although the standards guiding operationsmore » at these facilities are different, there are many similarities in the level of hazards, as well as the causes and the potential consequences of the events presented. Two of the incidents examined, one from a DOE operation and the other from a U.S. Army facility, resulted in workers receiving chemical burns. The remaining two incidents are similar in that significant conduct of operations failures occurred resulting in high-level radioactive waste (in the case of the DOE facility) or chemical agent (in the case of the Army facility) being transferred outside of engineering controls. A review of the investigation reports for all four events indicates the primary causes to be failures in work planning leading to ineffective hazard evaluation and control, lack of procedure adherence, and most importantly, lack of management oversight to effectively reinforce expectations for safe work planning and execution. DOE and Army safety programs are similar, and although there are some differences in contractual requirements, the expectations for safe performance are essentially the same. This analysis concludes that instilling a positive safety culture comes down to management leadership and engagement to (1) cultivate an environment that values a questioning attitude and (2) continually reinforce expectations for the appropriate level of rigor in work planning and procedure adherence. A review of the root causes and key contributing causes to the events indicate: - Three of the four root cause analyses cite lack of management engagement (oversight, involvement, ability to recognize issues, etc.) as a root cause to the events. - Two of the four root cause analyses cite work planning failures as a root cause to the events and all cause analyses reflect work planning failures as contributing factors to the events. - All events with the exception of the Tuba City plant shutdown indicate procedure noncompliance as a key contributor; in the case of Tuba City the procedure issues were primarily related to a lack of procedures, or a lack of sufficiently detailed procedures. - All events included discussion or suggestion of a lack of a questioning attitude, either on the part of management/supervision, work planners, or workers. This analysis suggests that the most critical drivers to safety culture are: - Management engagement, - Effective work planning and procedures, and - Procedure adherence with a questioning attitude to ensure procedural problems are identified and fixed. In high-hazard operational environments the importance of robust work planning processes and procedure adherence cannot be overstated. However, having the processes by themselves is not enough. Management must actively engage in expectation setting and ensure work planning that meets expectations for hazard analysis and control, develop a culture that encourages incident reporting and a questioning attitude, and routinely observe work performance to reinforce expectations for adherence to procedures/work control documents. In conclusion, the most critical driver to achieving a workforce culture that supports safe and effective project performance can be summarized as follows: 'Management engagement to continually reinforce expectations for work planning processes and procedure adherence in an environment that cultivates a questioning attitude'. (authors)« less
Test Operations Procedure (TOP) 5-2-521 Pyrotechnic Shock Test Procedures
2007-11-20
Clipping will produce a signal that resembles a square wave . (2) Filters are used to limit the frequency bandwidth of the signal . Low pass filters...video systems permit observation of explosive items under test. c. Facilities to perform non-destructive inspections such as x-ray, ultrasonic , magna...test. (1) Accelerometers (2) Signal Conditioners (3) Digital Recording System (4) Data Processing System with hardcopy output
Salehi, Mojtaba; Bahreininejad, Ardeshir
2011-08-01
Optimization of process planning is considered as the key technology for computer-aided process planning which is a rather complex and difficult procedure. A good process plan of a part is built up based on two elements: (1) the optimized sequence of the operations of the part; and (2) the optimized selection of the machine, cutting tool and Tool Access Direction (TAD) for each operation. In the present work, the process planning is divided into preliminary planning, and secondary/detailed planning. In the preliminary stage, based on the analysis of order and clustering constraints as a compulsive constraint aggregation in operation sequencing and using an intelligent searching strategy, the feasible sequences are generated. Then, in the detailed planning stage, using the genetic algorithm which prunes the initial feasible sequences, the optimized operation sequence and the optimized selection of the machine, cutting tool and TAD for each operation based on optimization constraints as an additive constraint aggregation are obtained. The main contribution of this work is the optimization of sequence of the operations of the part, and optimization of machine selection, cutting tool and TAD for each operation using the intelligent search and genetic algorithm simultaneously.
Salehi, Mojtaba
2010-01-01
Optimization of process planning is considered as the key technology for computer-aided process planning which is a rather complex and difficult procedure. A good process plan of a part is built up based on two elements: (1) the optimized sequence of the operations of the part; and (2) the optimized selection of the machine, cutting tool and Tool Access Direction (TAD) for each operation. In the present work, the process planning is divided into preliminary planning, and secondary/detailed planning. In the preliminary stage, based on the analysis of order and clustering constraints as a compulsive constraint aggregation in operation sequencing and using an intelligent searching strategy, the feasible sequences are generated. Then, in the detailed planning stage, using the genetic algorithm which prunes the initial feasible sequences, the optimized operation sequence and the optimized selection of the machine, cutting tool and TAD for each operation based on optimization constraints as an additive constraint aggregation are obtained. The main contribution of this work is the optimization of sequence of the operations of the part, and optimization of machine selection, cutting tool and TAD for each operation using the intelligent search and genetic algorithm simultaneously. PMID:21845020
8 CFR 1003.40 - Local operating procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Local operating procedures. 1003.40 Section... PROVISIONS EXECUTIVE OFFICE FOR IMMIGRATION REVIEW Immigration Court-Rules of Procedure § 1003.40 Local... establish local operating procedures, provided that: (a) Such operating procedure(s) shall not be...
8 CFR 1003.40 - Local operating procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 8 Aliens and Nationality 1 2011-01-01 2011-01-01 false Local operating procedures. 1003.40 Section... PROVISIONS EXECUTIVE OFFICE FOR IMMIGRATION REVIEW Immigration Court-Rules of Procedure § 1003.40 Local... establish local operating procedures, provided that: (a) Such operating procedure(s) shall not be...
Investigation report: H Reactor mischarging incident
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vinther, A.P.
1964-05-01
All cold reactor start-up procedures require the vertical safety rods (VSR) to be withdrawn in pairs with specific waiting periods between each pair withdrawal. This rod withdrawal procedure will assure an early and safe detection of reactor criticality should reactor reactivity conditions be different than predicted so that proper corrective actions can be taken. During the paired VSR removal of H reactor on April 17, 1964, while preparing for reactor start-up, an extremely low level rising period was detected with six VSR's still in the reactor. The withdrawn VSR's were promptly re-inserted. During the next several days other process difficultiesmore » were encountered. H Processing personnel began investigating the possibility that a number of process tubes might have been mischarged; one shift's charging effort appeared to be suspect as longitudinal peaking appeared nearly twice as severe as normal in the distorted region. Following verification of a charging error in the suspect group of 171 tubes, that group of tubes was discharged and recharged with the proper charge make-up. On April 24, during VSR removal for start-up, low level criticality was detected with three VSR's still in the unit. The VSR's were re-inserted and Operational Physics analysis requested. Following installation of additional poisoning, the Operational Physics analysis uncovered a reactivity prediction error related to the prior operation with the skewed flux distribution. However, in this case, as on April 17, the procedural paired VSR withdrawal provided safe detection of the criticality condition in adequate time to take prompt corrective action. A successful reactor start-up was then achieved later on April 24, and reactor operation has been normal since that time. 4 figs.« less
ERIC Educational Resources Information Center
Bernhard, Genore H.
A guide is presented for those unfamiliar with library procedures who wish to organize and operate a small library. Following a discussion of the modern library's role, there is detailed information about library boards, librarians, finance, legal problems, policies, equipment, supplies, and book acquisition and processing. Shelving, filing, book…
Potato Operation: automatic detection of potato diseases
NASA Astrophysics Data System (ADS)
Lefebvre, Marc; Zimmerman, Thierry; Baur, Charles; Guegerli, Paul; Pun, Thierry
1995-01-01
The Potato Operation is a collaborative, multidisciplinary project in the domain of destructive testing of agricultural products. It aims at automatizing pulp sampling of potatoes in order to detect possible viral diseases. Such viruses can decrease fields productivity by a factor of up to ten. A machine, composed of three conveyor belts, a vision system, a robotic arm and controlled by a PC has been built. Potatoes are brought one by one from a bulk to the vision system, where they are seized by a rotating holding device. The sprouts, where the viral activity is maximum, are then detected by an active vision process operating on multiple views. The 3D coordinates of the sampling point are communicated to the robot arm holding a drill. Some flesh is then sampled by the drill, then deposited into an Elisa plate. After sampling, the robot arm washes the drill in order to prevent any contamination. The PC computer simultaneously controls these processes, the conveying of the potatoes, the vision algorithms and the sampling procedure. The master process, that is the vision procedure, makes use of three methods to achieve the sprouts detection. A profile analysis first locates the sprouts as protuberances. Two frontal analyses, respectively based on fluorescence and local variance, confirm the previous detection and provide the 3D coordinate of the sampling zone. The other two processes work by interruption of the master process.
Standard operating procedures for neurophysiologic assessment of male sexual dysfunction.
Giuliano, Francois; Rowland, David L
2013-05-01
Can neurophysiological testing in male patients with sexual dysfunction benefit the decision-making process? The answer remains unclear. To provide standard operating procedures for the neurophysiologic assessment of male sexual dysfunction. Medical literature was reviewed and combined with expert opinion of the authors. Bulbocavernosus reflex latency time, pudendal somatosensory evoked potentials, and sympathetic skin responses have been considered as potential candidates for the diagnosis and assessment of erectile dysfunction (ED). Currently, there is no consensus on a standardized methodology for these neurophysiological investigations in the overall assessment of ED. These procedures are unable to assess the integrity of the efferent parasympathetic proerectile penile innervation; accordingly, none of these assessment procedures is recommended for ED patients. Corpus cavernosum electromyography (CC-EMG) can detect abnormalities in cavernous smooth muscle although these alterations can be attributed both to damage to autonomic penile innervation and to degenerative processes of the cavernous smooth muscle. CC-EMG is still considered experimental. Evidence does not support that men with premature ejaculation (PE) are consistently characterized by penile hypersensitivity; accordingly, penile threshold determination is not recommended to in the diagnosis of PE. Neurophysiological investigation of other components of the penile sensory pathways in PE patients has not provided any definitive contribution to the diagnosis. No neurophysiological assessment procedures yield additional information that consistently aids in the assessment of PE and ED. © 2013 International Society for Sexual Medicine.
The economical utilization of geothermal energy
NASA Astrophysics Data System (ADS)
Rose, G.
1982-12-01
The geothermal energy which is stored in hot dry rock could be theoretically utilized for the generation of power. The hot-dry-rock procedure can provide a flow of hot water. The considered binary system can transform the obtained thermal energy into electrical energy. The system makes use of a Rankine cycle with a working fluid having a low boiling point. Heat from the hot water is transferred to the working fluid. The present investigation is concerned with the development of a method for the calculation of the entire process. The results obtained with the computational method are to provide a basis for the determination of the operational characteristics. The development method is used for the study of a process based on the use of carbon dioxide as working fluid. The economics of a use of the hot-dry-rock process with the binary system is also investigated. It is found that the considered procedure is not economical. Economical operation requires, in particular, hot water supplied at a much lower cost.
Preparation of Effective Operating Manuals to Support Waste Management Plant Operator Training
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, S. R.
2003-02-25
Effective plant operating manuals used in a formal training program can make the difference between a successful operation and a failure. Once the plant process design and control strategies have been fixed, equipment has been ordered, and the plant is constructed, the only major variable affecting success is the capability of plant operating personnel. It is essential that the myriad details concerning plant operation are documented in comprehensive operating manuals suitable for training the non-technical personnel that will operate the plant. These manuals must cover the fundamental principles of each unit operation including how each operates, what process variables aremore » important, and the impact of each variable on the overall process. In addition, operators must know the process control strategies, process interlocks, how to respond to alarms, each of the detailed procedures required to start up and optimize the plant, and every control loop-including when it is appropriate to take manual control. More than anything else, operating mistakes during the start-up phase can lead to substantial delays in achieving design processing rates as well as to problems with government authorities if environmental permit limits are exceeded. The only way to assure return on plant investment is to ensure plant operators have the knowledge to properly run the plant from the outset. A comprehensive set of operating manuals specifically targeted toward plant operators and supervisors written by experienced operating personnel is the only effective way to provide the necessary information for formal start-up training.« less
Quantification of Gear Tooth Damage by Optimal Tracking of Vibration Signatures
NASA Technical Reports Server (NTRS)
Choy, F. K.; Veillette, R. J.; Polyshchuk, V.; Braun, M. J.; Hendricks, R. C.
1996-01-01
This paper presents a technique for quantifying the wear or damage of gear teeth in a transmission system. The procedure developed in this study can be applied as a part of either an onboard machine health-monitoring system or a health diagnostic system used during regular maintenance. As the developed methodology is based on analysis of gearbox vibration under normal operating conditions, no shutdown or special modification of operating parameters is required during the diagnostic process. The process of quantifying the wear or damage of gear teeth requires a set of measured vibration data and a model of the gear mesh dynamics. An optimization problem is formulated to determine the profile of a time-varying mesh stiffness parameter for which the model output approximates the measured data. The resulting stiffness profile is then related to the level of gear tooth wear or damage. The procedure was applied to a data set generated artificially and to another obtained experimentally from a spiral bevel gear test rig. The results demonstrate the utility of the procedure as part of an overall health-monitoring system.
49 CFR 193.2503 - Operating procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
...: FEDERAL SAFETY STANDARDS Operations § 193.2503 Operating procedures. Each operator shall follow one or more manuals of written procedures to provide safety in normal operation and in responding to an... 49 Transportation 3 2013-10-01 2013-10-01 false Operating procedures. 193.2503 Section 193.2503...
49 CFR 193.2503 - Operating procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
...: FEDERAL SAFETY STANDARDS Operations § 193.2503 Operating procedures. Each operator shall follow one or more manuals of written procedures to provide safety in normal operation and in responding to an... 49 Transportation 3 2011-10-01 2011-10-01 false Operating procedures. 193.2503 Section 193.2503...
49 CFR 193.2503 - Operating procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
...: FEDERAL SAFETY STANDARDS Operations § 193.2503 Operating procedures. Each operator shall follow one or more manuals of written procedures to provide safety in normal operation and in responding to an... 49 Transportation 3 2014-10-01 2014-10-01 false Operating procedures. 193.2503 Section 193.2503...
49 CFR 193.2503 - Operating procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
...: FEDERAL SAFETY STANDARDS Operations § 193.2503 Operating procedures. Each operator shall follow one or more manuals of written procedures to provide safety in normal operation and in responding to an... 49 Transportation 3 2012-10-01 2012-10-01 false Operating procedures. 193.2503 Section 193.2503...
48 CFR 952.227-13 - Patent rights-acquisition by the Government.
Code of Federal Regulations, 2011 CFR
2011-10-01
... a process or method; or to operate, in the case of a machine or system; and, in each case, under... procedures. (2) If the Contracting Officer learns of an unreported Contractor invention which the Contracting... upon the practice of any specific process, method, machine, manufacture, or composition of matter...
48 CFR 952.227-13 - Patent rights-acquisition by the Government.
Code of Federal Regulations, 2010 CFR
2010-10-01
... a process or method; or to operate, in the case of a machine or system; and, in each case, under... procedures. (2) If the Contracting Officer learns of an unreported Contractor invention which the Contracting... upon the practice of any specific process, method, machine, manufacture, or composition of matter...
48 CFR 952.227-13 - Patent rights-acquisition by the Government.
Code of Federal Regulations, 2014 CFR
2014-10-01
... a process or method; or to operate, in the case of a machine or system; and, in each case, under... procedures. (2) If the Contracting Officer learns of an unreported Contractor invention which the Contracting... upon the practice of any specific process, method, machine, manufacture, or composition of matter...
48 CFR 952.227-13 - Patent rights-acquisition by the Government.
Code of Federal Regulations, 2013 CFR
2013-10-01
... a process or method; or to operate, in the case of a machine or system; and, in each case, under... procedures. (2) If the Contracting Officer learns of an unreported Contractor invention which the Contracting... upon the practice of any specific process, method, machine, manufacture, or composition of matter...
48 CFR 952.227-13 - Patent rights-acquisition by the Government.
Code of Federal Regulations, 2012 CFR
2012-10-01
... a process or method; or to operate, in the case of a machine or system; and, in each case, under... procedures. (2) If the Contracting Officer learns of an unreported Contractor invention which the Contracting... upon the practice of any specific process, method, machine, manufacture, or composition of matter...
2007-12-01
37 3. Poka - yoke ............................................................................................37 4. Systems for...Standard operating procedures • Visual displays for workflow and communication • Total productive maintenance • Poka - yoke techniques to prevent...process step or eliminating non-value-added steps, and reducing the seven common wastes, will decrease the total time of a process. 3. Poka - yoke
Özden Omaygenç, Derya; Ünal, Nermin; Edipoğlu, Saadet İpek; Barca Şeker, Tuğçe; Özgül, Mehmet Akif; Turan, Demet; Özdemir, Cengiz; Karaca, İbrahim Oğuz; Çetinkaya, Erdoğan
2018-04-16
Regarding the fact that rigid bronchoscopy is generally performed under general anaesthesia and this patient subgroup is remarkably morbid, encountering procedure and/or anaesthesia related complications are highly likely. Here, we aimed to assess factors influencing recovery and detect possible determinants of adverse event occurrence during these operations performed in a tertiary referral centre. Eighty-one consecutive ASA I-IV patients were recruited for this investigation. In the operating theatre after induction of anaesthesia and advancement of the device, maintenance was provided with total intravenous anaesthesia. Neuromuscular blockage was invariably administered, and patients were ventilated manually. In addition to preoperative demographic and procedural characteristics, perioperative hemodynamic variables, recovery times and observed adverse events were noted. Basic demographic properties, ASA and Mallampati scores, and procedure specific variables as lesion localization, lesion and procedure type were comparable among groups assembled with reference to event occurrence. Patients who had experienced adverse event had higher heart rates. Recovery times were comparable between Event (-) and Event (+) groups. Relationship of recovery process were individually tested with all variables and only lesion type was detected to have an effect on respiration and extubation times. Among all parameters only procedural time seemed to be associated with adverse event occurrence (mins, 22.9 ± 11.9 vs 41.6 ± 28.8, P < .001). Recovery times related with return of spontaneous respiration were significantly lower in procedures performed for treatment of tumoral diseases in this study and procedure length was determined to be the ultimate factor which had an impact on adverse event occurrence. © 2018 John Wiley & Sons Ltd.
Suggested Operating Procedures for Aquifer Pumping Tests
This document is intended as a primer, describing the process for the design and performance of an “aquifer test” (how to obtain reliable data from a pumping test) to obtain accurate estimates of aquifer parameters.
12 CFR 1808.500 - Evaluation of Qualified Issuer Applications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... evaluation process will be based on established standard operating procedures, which may include interviews... Qualified Issuer over the life of the Bond to ensure it meets the performance standards over the life of the...
Solar industrial process heat systems: An assessment of standards for materials and components
NASA Astrophysics Data System (ADS)
Rossiter, W. J.; Shipp, W. E.
1981-09-01
A study was conducted to obtain information on the performance of materials and components in operational solar industrial process heat (PH) systems, and to provide recommendations for the development of standards including evaluative test procedures for materials and components. An assessment of the needs for standards for evaluating the long-term performance of materials and components of IPH systems was made. The assessment was based on the availability of existing standards, and information obtained from a field survey of operational systems, the literature, and discussions with individuals in the industry. Field inspections of 10 operational IPH systems were performed.
TORC3: Token-ring clearing heuristic for currency circulation
NASA Astrophysics Data System (ADS)
Humes, Carlos, Jr.; Lauretto, Marcelo S.; Nakano, Fábio; Pereira, Carlos A. B.; Rafare, Guilherme F. G.; Stern, Julio Michael
2012-10-01
Clearing algorithms are at the core of modern payment systems, facilitating the settling of multilateral credit messages with (near) minimum transfers of currency. Traditional clearing procedures use batch processing based on MILP - mixed-integer linear programming algorithms. The MILP approach demands intensive computational resources; moreover, it is also vulnerable to operational risks generated by possible defaults during the inter-batch period. This paper presents TORC3 - the Token-Ring Clearing Algorithm for Currency Circulation. In contrast to the MILP approach, TORC3 is a real time heuristic procedure, demanding modest computational resources, and able to completely shield the clearing operation against the participating agents' risk of default.
Gadhinglajkar, Shrinivas; Sreedhar, Rupa; Karunakaran, Jayakumar; Misra, Manoranjan; Somasundaram, Ganesh; Mathew, Thomas
2010-01-01
A pacing system infection may lead to infective endocarditis and systemic sepsis. Tricuspid valve surgery may be required if the valve is severely damaged in the process of endocarditis. Although, cardiopulmonary bypass is the safe choice for performing right-heart procedures, it may carry risk of inducing systemic inflammatory response and multi-organ dysfunction. Some studies have advocated TV surgery without institution of CPB. We report tricuspid valve excision using the off-pump inflow occlusion technique in a 68-year-old man. We also describe role of intra-operative TEE as a monitoring tool at different stages of the surgical procedure.
The operational processing of wind estimates from cloud motions: Past, present and future
NASA Technical Reports Server (NTRS)
Novak, C.; Young, M.
1977-01-01
Current NESS winds operations provide approximately 1800 high quality wind estimates per day to about twenty domestic and foreign users. This marked improvement in NESS winds operations was the result of computer techniques development which began in 1969 to streamline and improve operational procedures. In addition, the launch of the SMS-1 satellite in 1974, the first in the second generation of geostationary spacecraft, provided an improved source of visible and infrared scanner data for the extraction of wind estimates. Currently, operational winds processing at NESS is accomplished by the automated and manual analyses of infrared data from two geostationary spacecraft. This system uses data from SMS-2 and GOES-1 to produce wind estimates valid for 00Z, 12Z and 18Z synoptic times.
40 CFR 160.81 - Standard operating procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 25 2013-07-01 2013-07-01 false Standard operating procedures. 160.81... GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.81 Standard operating procedures. (a) A testing facility shall have standard operating procedures in writing setting forth study...
40 CFR 160.81 - Standard operating procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 24 2014-07-01 2014-07-01 false Standard operating procedures. 160.81... GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.81 Standard operating procedures. (a) A testing facility shall have standard operating procedures in writing setting forth study...
40 CFR 160.81 - Standard operating procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 25 2012-07-01 2012-07-01 false Standard operating procedures. 160.81... GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.81 Standard operating procedures. (a) A testing facility shall have standard operating procedures in writing setting forth study...
Procedure for extraction of disparate data from maps into computerized data bases
NASA Technical Reports Server (NTRS)
Junkin, B. G.
1979-01-01
A procedure is presented for extracting disparate sources of data from geographic maps and for the conversion of these data into a suitable format for processing on a computer-oriented information system. Several graphic digitizing considerations are included and related to the NASA Earth Resources Laboratory's Digitizer System. Current operating procedures for the Digitizer System are given in a simplified and logical manner. The report serves as a guide to those organizations interested in converting map-based data by using a comparable map digitizing system.
M-DAS: System for multispectral data analysis. [in Saginaw Bay, Michigan
NASA Technical Reports Server (NTRS)
Johnson, R. H.
1975-01-01
M-DAS is a ground data processing system designed for analysis of multispectral data. M-DAS operates on multispectral data from LANDSAT, S-192, M2S and other sources in CCT form. Interactive training by operator-investigators using a variable cursor on a color display was used to derive optimum processing coefficients and data on cluster separability. An advanced multivariate normal-maximum likelihood processing algorithm was used to produce output in various formats: color-coded film images, geometrically corrected map overlays, moving displays of scene sections, coverage tabulations and categorized CCTs. The analysis procedure for M-DAS involves three phases: (1) screening and training, (2) analysis of training data to compute performance predictions and processing coefficients, and (3) processing of multichannel input data into categorized results. Typical M-DAS applications involve iteration between each of these phases. A series of photographs of the M-DAS display are used to illustrate M-DAS operation.
Representing operations procedures using temporal dependency networks
NASA Technical Reports Server (NTRS)
Fayyad, Kristina E.; Cooper, Lynne P.
1993-01-01
DSN Link Monitor & Control (LMC) operations consist primarily of executing procedures to configure, calibrate, test, and operate a communications link between an interplanetary spacecraft and its mission control center. Currently the LMC operators are responsible for integrating procedures into an end-to-end series of steps. The research presented in this paper is investigating new ways of specifying operations procedures that incorporate the insight of operations, engineering, and science personnel to improve mission operations. The paper describes the rationale for using Temporal Dependency Networks (TDN's) to represent the procedures, a description of how the data is acquired, and the knowledge engineering effort required to represent operations procedures. Results of operational tests of this concept, as implemented in the LMC Operator Assistant Prototype (LMCOA), are also presented.
Kepler Science Operations Center Architecture
NASA Technical Reports Server (NTRS)
Middour, Christopher; Klaus, Todd; Jenkins, Jon; Pletcher, David; Cote, Miles; Chandrasekaran, Hema; Wohler, Bill; Girouard, Forrest; Gunter, Jay P.; Uddin, Kamal;
2010-01-01
We give an overview of the operational concepts and architecture of the Kepler Science Data Pipeline. Designed, developed, operated, and maintained by the Science Operations Center (SOC) at NASA Ames Research Center, the Kepler Science Data Pipeline is central element of the Kepler Ground Data System. The SOC charter is to analyze stellar photometric data from the Kepler spacecraft and report results to the Kepler Science Office for further analysis. We describe how this is accomplished via the Kepler Science Data Pipeline, including the hardware infrastructure, scientific algorithms, and operational procedures. The SOC consists of an office at Ames Research Center, software development and operations departments, and a data center that hosts the computers required to perform data analysis. We discuss the high-performance, parallel computing software modules of the Kepler Science Data Pipeline that perform transit photometry, pixel-level calibration, systematic error-correction, attitude determination, stellar target management, and instrument characterization. We explain how data processing environments are divided to support operational processing and test needs. We explain the operational timelines for data processing and the data constructs that flow into the Kepler Science Data Pipeline.
SOHO Mission Interruption Joint NASA/ESA Investigation Board
NASA Technical Reports Server (NTRS)
1998-01-01
Contact with the SOlar Heliospheric Observatory (SOHO) spacecraft was lost in the early morning hours of June 25, 1998, Eastern Daylight Time (EDT), during a planned period of calibrations, maneuvers, and spacecraft reconfigurations. Prior to this the SOHO operations team had concluded two years of extremely successful science operations. A joint European Space Agency (ESA)/National Aeronautics and Space Administration (NASA) engineering team has been planning and executing recovery efforts since loss of contact with some success to date. ESA and NASA management established the SOHO Mission Interruption Joint Investigation Board to determine the actual or probable cause(s) of the SOHO spacecraft mishap. The Board has concluded that there were no anomalies on-board the SOHO spacecraft but that a number of ground errors led to the major loss of attitude experienced by the spacecraft. The Board finds that the loss of the SOHO spacecraft was a direct result of operational errors, a failure to adequately monitor spacecraft status, and an erroneous decision which disabled part of the on-board autonomous failure detection. Further, following the occurrence of the emergency situation, the Board finds that insufficient time was taken by the operations team to fully assess the spacecraft status prior to initiating recovery operations. The Board discovered that a number of factors contributed to the circumstances that allowed the direct causes to occur. The Board strongly recommends that the two Agencies proceed immediately with a comprehensive review of SOHO operations addressing issues in the ground procedures, procedure implementation, management structure and process, and ground systems. This review process should be completed and process improvements initiated prior to the resumption of SOHO normal operations.
NASA Technical Reports Server (NTRS)
Martin, T. V.; Mullins, N. E.
1972-01-01
The operating and set-up procedures for the multi-satellite, multi-arc GEODYN- Orbit Determination program are described. All system output is analyzed. The GEODYN Program is the nucleus of the entire GEODYN system. It is a definitive orbit and geodetic parameter estimation program capable of simultaneously processing observations from multiple arcs of multiple satellites. GEODYN has two modes of operation: (1) the data reduction mode and (2) the orbit generation mode.
W-026, transuranic waste restricted waste management (TRU RWM) glovebox operational test report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leist, K.J.
1998-02-18
The TRU Waste/Restricted Waste Management (LLW/PWNP) Glovebox 401 is designed to accept and process waste from the Transuranic Process Glovebox 302. Waste is transferred to the glovebox via the Drath and Schraeder Bagless Transfer Port (DO-07401) on a transfer stand. The stand is removed with a hoist and the operator inspects the waste (with the aid of the Sampling and Treatment Director) to determine a course of action for each item. The waste is separated into compliant and non compliant. One Trip Port DO-07402A is designated as ``Compliant``and One Trip Port DO-07402B is designated as ``Non Compliant``. As the processingmore » (inspection, bar coding, sampling and treatment) of the transferred items takes place, residue is placed in the appropriate One Trip port. The status of the waste items is tracked by the Data Management System (DMS) via the Plant Control System (PCS) barcode interface. As an item is moved for sampling or storage or it`s state altered by treatment, the Operator will track an items location using a portable barcode reader and entry any required data on the DMS console. The Operational Test Procedure (OTP) will perform evolutions (described here) using the Plant Operating Procedures (POP) in order to verify that they are sufficient and accurate for controlled glovebox operation.« less
Gnoth, S; Jenzsch, M; Simutis, R; Lübbert, A
2007-10-31
The Process Analytical Technology (PAT) initiative of the FDA is a reaction on the increasing discrepancy between current possibilities in process supervision and control of pharmaceutical production processes and its current application in industrial manufacturing processes. With rigid approval practices based on standard operational procedures, adaptations of production reactors towards the state of the art were more or less inhibited for long years. Now PAT paves the way for continuous process and product improvements through improved process supervision based on knowledge-based data analysis, "Quality-by-Design"-concepts, and, finally, through feedback control. Examples of up-to-date implementations of this concept are presented. They are taken from one key group of processes in recombinant pharmaceutical protein manufacturing, the cultivations of genetically modified Escherichia coli bacteria.
34 CFR 602.23 - Operating procedures all agencies must have.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 3 2011-07-01 2011-07-01 false Operating procedures all agencies must have. 602.23... Criteria for Recognition Required Operating Policies and Procedures § 602.23 Operating procedures all... that is related to the agency's standards or procedures. The agency may not complete its review and...
34 CFR 602.23 - Operating procedures all agencies must have.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 34 Education 3 2013-07-01 2013-07-01 false Operating procedures all agencies must have. 602.23... Criteria for Recognition Required Operating Policies and Procedures § 602.23 Operating procedures all... that is related to the agency's standards or procedures. The agency may not complete its review and...
34 CFR 602.23 - Operating procedures all agencies must have.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 34 Education 3 2012-07-01 2012-07-01 false Operating procedures all agencies must have. 602.23... Criteria for Recognition Required Operating Policies and Procedures § 602.23 Operating procedures all... that is related to the agency's standards or procedures. The agency may not complete its review and...
34 CFR 602.23 - Operating procedures all agencies must have.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 3 2010-07-01 2010-07-01 false Operating procedures all agencies must have. 602.23... Criteria for Recognition Required Operating Policies and Procedures § 602.23 Operating procedures all... that is related to the agency's standards or procedures. The agency may not complete its review and...
Code of Federal Regulations, 2013 CFR
2013-07-01
... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...
Code of Federal Regulations, 2012 CFR
2012-07-01
... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...
Code of Federal Regulations, 2014 CFR
2014-07-01
... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...
Long-term pavement performance program manual for profile measurements and processing
DOT National Transportation Integrated Search
2008-11-01
This manual describes operational procedures for measuring longitudinal pavement profiles for the Long-Term Pavement Performance (LTPP) Program using the International Cybernetics Corporation (ICC) road profiler, Face Company Dipstick, and the rod an...
NASA Technical Reports Server (NTRS)
2002-01-01
Ames Research Center granted Reality Capture Technologies (RCT), Inc., a license to further develop NASA's Mars Map software platform. The company incorporated NASA#s innovation into software that uses the Virtual Plant Model (VPM)(TM) to structure, modify, and implement the construction sites of industrial facilities, as well as develop, validate, and train operators on procedures. The VPM orchestrates the exchange of information between engineering, production, and business transaction systems. This enables users to simulate, control, and optimize work processes while increasing the reliability of critical business decisions. Engineers can complete the construction process and test various aspects of it in virtual reality before building the actual structure. With virtual access to and simulation of the construction site, project personnel can manage, access control, and respond to changes on complex constructions more effectively. Engineers can also create operating procedures, training, and documentation. Virtual Plant Model(TM) is a trademark of Reality Capture Technologies, Inc.
The California Cooperative Remote Sensing Project
NASA Technical Reports Server (NTRS)
Hlavka, Christine A.; Sheffner, Edwin J.
1988-01-01
The USDA, the California Department of Water Resources (CDWR), the Remote Sensing Research Program of the University of California (UCB) and NASA have completed a 4-yr cooperative project on the use of remote sensing in monitoring California agriculture. This report is a summary of the project and the final report of NASA's contribution to it. The cooperators developed procedures that combined the use of LANDSAT Multispectral Scanner imagery and digital data with good ground survey data for area estimation and mapping of the major crops in California. An inventory of the Central Valley was conducted as an operational test of the procedures. The satellite and survey data were acquired by USDA and UCB and processed by CDWR and NASA. The inventory was completed on schedule, thus demonstrating the plausibility of the approach, although further development of the data processing system is necessary before it can be used efficiently in an operational environment.
NASA Technical Reports Server (NTRS)
Noor, Ahmed K.; Peters, Jeanne M.
1989-01-01
A computational procedure is presented for the nonlinear dynamic analysis of unsymmetric structures on vector multiprocessor systems. The procedure is based on a novel hierarchical partitioning strategy in which the response of the unsymmetric and antisymmetric response vectors (modes), each obtained by using only a fraction of the degrees of freedom of the original finite element model. The three key elements of the procedure which result in high degree of concurrency throughout the solution process are: (1) mixed (or primitive variable) formulation with independent shape functions for the different fields; (2) operator splitting or restructuring of the discrete equations at each time step to delineate the symmetric and antisymmetric vectors constituting the response; and (3) two level iterative process for generating the response of the structure. An assessment is made of the effectiveness of the procedure on the CRAY X-MP/4 computers.
An XML Representation for Crew Procedures
NASA Technical Reports Server (NTRS)
Simpson, Richard C.
2005-01-01
NASA ensures safe operation of complex systems through the use of formally-documented procedures, which encode the operational knowledge of the system as derived from system experts. Crew members use procedure documentation on the ground for training purposes and on-board space shuttle and space station to guide their activities. Investigators at JSC are developing a new representation for procedures that is content-based (as opposed to display-based). Instead of specifying how a procedure should look on the printed page, the content-based representation will identify the components of a procedure and (more importantly) how the components are related (e.g., how the activities within a procedure are sequenced; what resources need to be available for each activity). This approach will allow different sets of rules to be created for displaying procedures on a computer screen, on a hand-held personal digital assistant (PDA), verbally, or on a printed page, and will also allow intelligent reasoning processes to automatically interpret and use procedure definitions. During his NASA fellowship, Dr. Simpson examined how various industries represent procedures (also called business processes or workflows), in areas such as manufacturing, accounting, shipping, or customer service. A useful method for designing and evaluating workflow representation languages is by determining their ability to encode various workflow patterns, which depict abstract relationships between the components of a procedure removed from the context of a specific procedure or industry. Investigators have used this type of analysis to evaluate how well-suited existing workflow representation languages are for various industries based on the workflow patterns that commonly arise across industry-specific procedures. Based on this type of analysis, it is already clear that existing workflow representations capture discrete flow of control (i.e., when one activity should start and stop based on when other activities start and stop), but do not capture the flow of data, materials, resources or priorities. Existing workflow representation languages are also limited to representing sequences of discrete activities, and cannot encode procedures involving continuous flow of information or materials between activities.
Human Factors Analysis to Improve the Processing of Ares-1 Launch Vehicle
NASA Technical Reports Server (NTRS)
Stambolian, Damon B.; Dippolito, Gregory M.; Nyugen, Bao; Dischinger, Charles; Tran, Donald; Henderson, Gena; Barth, Tim
2011-01-01
This slide presentation reviews the use of Human Factors analysis in improving the ground processing procedures for the Ares-1 launch vehicle. The light vehicle engineering designers for Ares-l launch vehicle had to design the flight vehicle for effective, efficient and safe ground operations in the cramped dimensions in a rocket design. The use of a mockup of the area where the technician would be required to work proved to be a very effective method to promote the collaboration between the Ares-1 designers and the ground operations personnel.
Wagner, Richard J.; Mattraw, Harold C.; Ritz, George F.; Smith, Brett A.
2000-01-01
The U.S. Geological Survey uses continuous water-quality monitors to assess variations in the quality of the Nation's surface water. A common system configuration for data collection is the four-parameter water-quality monitoring system, which collects temperature, specific conductance, dissolved oxygen, and pH data, although systems can be configured to measure other properties such as turbidity or chlorophyll. The sensors that are used to measure these water properties require careful field observation, cleaning, and calibration procedures, as well as thorough procedures for the computation and publication of final records. Data from sensors can be used in conjunction with collected samples and chemical analyses to estimate chemical loads. This report provides guidelines for site-selection considerations, sensor test methods, field procedures, error correction, data computation, and review and publication processes. These procedures have evolved over the past three decades, and the process continues to evolve with newer technologies.
Objective assessment of operator performance during ultrasound-guided procedures.
Tabriz, David M; Street, Mandie; Pilgram, Thomas K; Duncan, James R
2011-09-01
Simulation permits objective assessment of operator performance in a controlled and safe environment. Image-guided procedures often require accurate needle placement, and we designed a system to monitor how ultrasound guidance is used to monitor needle advancement toward a target. The results were correlated with other estimates of operator skill. The simulator consisted of a tissue phantom, ultrasound unit, and electromagnetic tracking system. Operators were asked to guide a needle toward a visible point target. Performance was video-recorded and synchronized with the electromagnetic tracking data. A series of algorithms based on motor control theory and human information processing were used to convert raw tracking data into different performance indices. Scoring algorithms converted the tracking data into efficiency, quality, task difficulty, and targeting scores that were aggregated to create performance indices. After initial feasibility testing, a standardized assessment was developed. Operators (N = 12) with a broad spectrum of skill and experience were enrolled and tested. Overall scores were based on performance during ten simulated procedures. Prior clinical experience was used to independently estimate operator skill. When summed, the performance indices correlated well with estimated skill. Operators with minimal or no prior experience scored markedly lower than experienced operators. The overall score tended to increase according to operator's clinical experience. Operator experience was linked to decreased variation in multiple aspects of performance. The aggregated results of multiple trials provided the best correlation between estimated skill and performance. A metric for the operator's ability to maintain the needle aimed at the target discriminated between operators with different levels of experience. This study used a highly focused task model, standardized assessment, and objective data analysis to assess performance during simulated ultrasound-guided needle placement. The performance indices were closely related to operator experience.
Office-Based Procedures for the Diagnosis and Treatment of Laryngeal Pathology.
Wellenstein, David J; Schutte, Henrieke W; Takes, Robert P; Honings, Jimmie; Marres, Henri A M; Burns, James A; van den Broek, Guido B
2017-09-18
Since the development of distal chip endoscopes with a working channel, diagnostic and therapeutic possibilities in the outpatient clinic in the management of laryngeal pathology have increased. Which of these office-based procedures are currently available, and their clinical indications and possible advantages, remains unclear. Review of literature on office-based procedures in laryngology and head and neck oncology. Flexible endoscopic biopsy (FEB), vocal cord injection, and laser surgery are well-established office-based procedures that can be performed under topical anesthesia. These procedures demonstrate good patient tolerability and multiple advantages. Office-based procedures under topical anesthesia are currently an established method in the management of laryngeal pathology. These procedures offer medical and economic advantages compared with operating room-performed procedures. Furthermore, office-based procedures enhance the speed and timing of the diagnostic and therapeutic process. Copyright © 2017 The Voice Foundation. All rights reserved.
Implementing an Integrated Commitment Management System at the Savannah River Site Tank Farms
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blanchard, A.
1999-06-16
Recently, the Savannah River Site Tank Farms have been transitioning from pre-1990 Authorization Basis requirements to new 5480.22/.23 requirements. Implementation of the new Authorization Basis has resulted in more detailed requirements, a completely new set of implementing procedures, and the expectation of even more disciplined operations. Key to the success of this implementation has been the development of an Integrated Commitment Management System (ICMS) by Westinghouse Safety Management Solutions. The ICMS has two elements: the Authorization Commitment Matrix (ACM), and a Procedure Consistency Review methodology. The Authorization Commitment Matrix is a linking database, which ties requirements and implementing documents together.more » The associated Procedure Consistency Review process ensures that the procedures to be credited in the ACM do in fact correctly and completely meet all intended commitments. This Integrated Commitment Management System helps Westinghouse Safety Management Solutions and the facility operations and engineering organizations take ownership in the implementation of the requirements that have been developed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hance, R.; /Fermilab
1998-08-26
This procedure is used when it is necessary to operate the solenoid energization, controls, interlocks and quench detection system. Note that a separate procedure exists for operating the solenoid 'cryogenic' systems. Only D0 Control Room Operators or the Project Electrical Engineer are qualified to execute these procedures or operate the solenoid system. This procedure assumes that the operator is familiar with using the Distributed Manufacturing Automation and Control Software (DMACS).
Lessons Learned from Optical Payload for Lasercomm Science (OPALS) Mission Operations
NASA Technical Reports Server (NTRS)
Sindiy, Oleg V.; Abrahamson, Matthew J.; Biswas, Abhijit; Wright, Malcolm W.; Padams, Jordan H.; Konyha, Alexander L.
2015-01-01
This paper provides an overview of Optical Payload for Lasercomm Science (OPALS) activities and lessons learned during mission operations. Activities described cover the periods of commissioning, prime, and extended mission operations, during which primary and secondary mission objectives were achieved for demonstrating space-to-ground optical communications. Lessons learned cover Mission Operations System topics in areas of: architecture verification and validation, staffing, mission support area, workstations, workstation tools, interfaces with support services, supporting ground stations, team training, procedures, flight software upgrades, post-processing tools, and public outreach.
Using a 3D CAD plant model to simplify process hazard reviews
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tolpa, G.
A Hazard and Operability (HAZOP) review is a formal predictive procedure used to identify potential hazard and operability problems associated with certain processes and facilities. The HAZOP procedure takes place several times during the life cycle of the facility. Replacing plastic models, layout and detail drawings with a 3D CAD electronic model, provides access to process safety information and a detailed level of plant topology that approaches the visualization capability of the imagination. This paper describes the process that is used for adding the use of a 3D CAD model to flowsheets and proven computer programs for the conduct ofmore » hazard and operability reviews. Using flowsheets and study nodes as a road map for the review the need for layout and other detail drawings is all but eliminated. Using the 3D CAD model again for a post-P and ID HAZOP supports conformance to layout and safety requirements, provides superior visualization of the plant configuration and preserves the owners equity in the design. The response from the review teams are overwhelmingly in favor of this type of review over a review that uses only drawings. Over the long term the plant model serves more than just process hazards analysis. Ongoing use of the model can satisfy the required access to process safety information, OHSA documentation and other legal requirements. In this paper extensive instructions address the logic for the process hazards analysis and the preparation required to assist anyone who wishes to add the use of a 3D model to their review.« less
ERIC Educational Resources Information Center
Wenjuan, Hao; Rui, Liang
2016-01-01
Teaching is a spiral rising process. A complete teaching should be composed of five parts: theoretical basis, goal orientation, operating procedures, implementation conditions and assessment. On the basis of the genre knowledge, content-based approach and process approach, this text constructs the Teaching Model of College Writing Instruction, in…
The purpose of this SOP is to describe how lab results are organized and processed into the official database known as the Complete Dataset (CDS); to describe the structure and creation of the Analysis-ready Dataset (ADS); and to describe the structure and process of creating the...
Saturn S-2 production operations techniques: Production welding. Volume 1: Bulkhead welding
NASA Technical Reports Server (NTRS)
Abel, O. G.
1970-01-01
The complex Saturn S-2 welding processes and procedures required considerable development and refinement to establish a production capability that could consistently produce aluminum alloy welds within specified requirements. The special processes and techniques are defined that were established for the welding of gore-to-gore and manhole- or closeout-to-gore.
Code of Federal Regulations, 2010 CFR
2010-01-01
... performance and safety during reactor operation. Also, in all cases precise control of processes, procedures... elements include equipment that: (1) Normally comes in direct contact with, or directly processes or... pellets; (2) Automatic welding machines especially designed or prepared for welding end caps onto the fuel...
A real-time programming system.
Townsend, H R
1979-03-01
The paper describes a Basic Operating and Scheduling System (BOSS) designed for a small computer. User programs are organised as self-contained modular 'processes' and the way in which the scheduler divides the time of the computer equally between them, while arranging for any process which has to respond to an interrupt from a peripheral device to be given the necessary priority, is described in detail. Next the procedures provided by the operating system to organise communication between processes are described, and how they are used to construct dynamically self-modifying real-time systems. Finally, the general philosophy of BOSS and applications to a multi-processor assembly are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mirro, G.A.
1997-02-01
This paper presents an overview of issues related to handling NORM materials, and provides a description of a facility designed for the processing of NORM contaminated equipment. With regard to handling NORM materials the author discusses sources of NORM, problems, regulations and disposal options, potential hazards, safety equipment, and issues related to personnel protection. For the facility, the author discusses: description of the permanent facility; the operations of the facility; the license it has for handling specific radioactive material; operating and safety procedures; decontamination facilities on site; NORM waste processing capabilities; and offsite NORM services which are available.
NASA Technical Reports Server (NTRS)
Blocher, J. M., Jr.; Browning, M. F.
1979-01-01
The construction and operation of an experimental process system development unit (EPSDU) for the production of granular semiconductor grade silicon by the zinc vapor reduction of silicon tetrachloride in a fluidized bed of seed particles is presented. The construction of the process development unit (PDU) is reported. The PDU consists of four critical units of the EPSDU: the fluidized bed reactor, the reactor by product condenser, the zinc vaporizer, and the electrolytic cell. An experimental wetted wall condenser and its operation are described. Procedures are established for safe handling of SiCl4 leaks and spills from the EPSDU and PDU.
Legacy of Operational Space Medicine During the Space Shuttle Program
NASA Technical Reports Server (NTRS)
Stepaniakm, P.; Gilmore, S.; Johnston, S.; Chandler, M.; Beven, G.
2011-01-01
The Johnson Space Center s Medical Science Division branches were involved in preparing astronauts for space flight during the 30 year period of the Space Shuttle Program. These branches included the Flight Medicine Clinic, Medical Operations and the Behavioral Health Program. The components of each facet of these support services were: the Flight Medicine Clinic s medical selection process and medical care; the Medical Operations equipment, training, procedures and emergency medical services; and the Behavioral Health and Performance operations. Each presenter will discuss the evolution of its operations, implementations, lessons learned and recommendations for future vehicles and short duration space missions.
[Design of an HACCP program for a cocoa processing facility].
López D'Sola, Patrizia; Sandia, María Gabriela; Bou Rached, Lizet; Hernández Serrano, Pilar
2012-12-01
The HACCP plan is a food safety management tool used to control physical, chemical and biological hazards associated to food processing through all the processing chain. The aim of this work is to design a HACCP Plan for a Venezuelan cocoa processing facility.The production of safe food products requires that the HACCP system be built upon a solid foundation of prerequisite programs such as Good Manufacturing Practices (GMP) and Sanitation Standard Operating Procedures (SSOP). The existence and effectiveness of these prerequisite programs were previously assessed.Good Agriculture Practices (GAP) audit to cocoa nibs suppliers were performed. To develop the HACCP plan, the five preliminary tasks and the seven HACCP principles were accomplished according to Codex Alimentarius procedures. Three Critical Control Points (CCP) were identified using a decision tree: winnowing (control of ochratoxin A), roasting (Salmonella control) and metallic particles detection. For each CCP, Critical limits were established, the Monitoring procedures, Corrective actions, Procedures for Verification and Documentation concerning all procedures and records appropriate to these principles and their application was established. To implement and maintain a HACCP plan for this processing plant is suggested. Recently OchratoxinA (OTA) has been related to cocoa beans. Although the shell separation from the nib has been reported as an effective measure to control this chemical hazard, ochratoxin prevalence study in cocoa beans produced in the country is recommended, and validate the winnowing step as well
Vo, Elaine; Davila, Jessica A; Hou, Jason; Hodge, Krystle; Li, Linda T; Suliburk, James W; Kao, Lillian S; Berger, David H; Liang, Mike K
2013-08-01
Large databases provide a wealth of information for researchers, but identifying patient cohorts often relies on the use of current procedural terminology (CPT) codes. In particular, studies of stoma surgery have been limited by the accuracy of CPT codes in identifying and differentiating ileostomy procedures from colostomy procedures. It is important to make this distinction because the prevalence of complications associated with stoma formation and reversal differ dramatically between types of stoma. Natural language processing (NLP) is a process that allows text-based searching. The Automated Retrieval Console is an NLP-based software that allows investigators to design and perform NLP-assisted document classification. In this study, we evaluated the role of CPT codes and NLP in differentiating ileostomy from colostomy procedures. Using CPT codes, we conducted a retrospective study that identified all patients undergoing a stoma-related procedure at a single institution between January 2005 and December 2011. All operative reports during this time were reviewed manually to abstract the following variables: formation or reversal and ileostomy or colostomy. Sensitivity and specificity for validation of the CPT codes against the mastery surgery schedule were calculated. Operative reports were evaluated by use of NLP to differentiate ileostomy- from colostomy-related procedures. Sensitivity and specificity for identifying patients with ileostomy or colostomy procedures were calculated for CPT codes and NLP for the entire cohort. CPT codes performed well in identifying stoma procedures (sensitivity 87.4%, specificity 97.5%). A total of 664 stoma procedures were identified by CPT codes between 2005 and 2011. The CPT codes were adequate in identifying stoma formation (sensitivity 97.7%, specificity 72.4%) and stoma reversal (sensitivity 74.1%, specificity 98.7%), but they were inadequate in identifying ileostomy (sensitivity 35.0%, specificity 88.1%) and colostomy (75.2% and 80.9%). NLP performed with greater sensitivity, specificity, and accuracy than CPT codes in identifying stoma procedures and stoma types. Major differences where NLP outperformed CPT included identifying ileostomy (specificity 95.8%, sensitivity 88.3%, and accuracy 91.5%) and colostomy (97.6%, 90.5%, and 92.8%, respectively). CPT codes can identify effectively patients who have had stoma procedures and are adequate in distinguishing between formation and reversal; however, CPT codes cannot differentiate ileostomy from colostomy. NLP can be used to differentiate between ileostomy- and colostomy-related procedures. The role of NLP in conjunction with electronic medical records in data retrieval warrants further investigation. Published by Mosby, Inc.
Formalizing procedures for operations automation, operator training and spacecraft autonomy
NASA Technical Reports Server (NTRS)
Lecouat, Francois; Desaintvincent, Arnaud
1994-01-01
The generation and validation of operations procedures is a key task of mission preparation that is quite complex and costly. This has motivated the development of software applications providing support for procedures preparation. Several applications have been developed at MATRA MARCONI SPACE (MMS) over the last five years. They are presented in the first section of this paper. The main idea is that if procedures are represented in a formal language, they can be managed more easily with a computer tool and some automatic verifications can be performed. One difficulty is to define a formal language that is easy to use for operators and operations engineers. From the experience of the various procedures management tools developed in the last five years (including the POM, EOA, and CSS projects), MMS has derived OPSMAKER, a generic tool for procedure elaboration and validation. It has been applied to quite different types of missions, ranging from crew procedures (PREVISE system), ground control centers management procedures (PROCSU system), and - most relevant to the present paper - satellite operation procedures (PROCSAT developed for CNES, to support the preparation and verification of SPOT 4 operation procedures, and OPSAT for MMS telecom satellites operation procedures).
Training Community Modeling and Simulation Business Plan: 2009 Edition
2010-04-01
strategic information assurance 33 33 Provide crisis action procedures training 34 34 Provide the IC SOF-specific training at the operational level... information and products • Collaborative analysis processes • Dissemination of information throughout a command and to subordinates by redundant means...centric M&S capabilities will improve training for information warfare, assist with training for homeland defense operations, crisis -management plan- ning
Behavioral Variability, Learning Processes, and Creativity
1990-09-01
Nursery Schools . ~ 9-10 y.o. subjects, at the concrete operative stage and coming from Primary Schools . - 14-15 y.o. subjects, at the formal thought...stage and coming from General Secondary Schools (no Technical School subject has been considered). - Adults, students at the University. Cognitive...classifications combine in a single situation, the operations of seiation and of classification, as approached in the classical Piaget’s procedures
21 CFR 111.153 - What are the requirements under this subpart G for written procedures?
Code of Federal Regulations, 2012 CFR
2012-04-01
... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Production and Process Control... or Labeling as a Dietary Supplement § 111.153 What are the requirements under this subpart G for...
21 CFR 111.153 - What are the requirements under this subpart G for written procedures?
Code of Federal Regulations, 2013 CFR
2013-04-01
... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Production and Process Control... or Labeling as a Dietary Supplement § 111.153 What are the requirements under this subpart G for...
21 CFR 111.153 - What are the requirements under this subpart G for written procedures?
Code of Federal Regulations, 2014 CFR
2014-04-01
... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Production and Process Control... or Labeling as a Dietary Supplement § 111.153 What are the requirements under this subpart G for...
21 CFR 111.153 - What are the requirements under this subpart G for written procedures?
Code of Federal Regulations, 2011 CFR
2011-04-01
... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Production and Process Control... or Labeling as a Dietary Supplement § 111.153 What are the requirements under this subpart G for...
21 CFR 111.153 - What are the requirements under this subpart G for written procedures?
Code of Federal Regulations, 2010 CFR
2010-04-01
... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Production and Process Control... or Labeling as a Dietary Supplement § 111.153 What are the requirements under this subpart G for...
Student Receivables Management: Opportunities for Improved Practices.
ERIC Educational Resources Information Center
Jacquin, Jules C.; Goyal, Anil K.
1995-01-01
The college or university's business office can help reduce problems with student receivables through procedural review of the tuition revenue process, application of analytical methods, and improved operating practices. Admissions, financial aid, and billing offices must all be involved. (MSE)
40 CFR 240.200-1 - Requirement.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended Procedures § 240.200-1 Requirement. In consultation with the responsible agencies, the owner/operator shall determine what wastes shall...
40 CFR 240.200-1 - Requirement.
Code of Federal Regulations, 2011 CFR
2011-07-01
...-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR THE THERMAL PROCESSING OF SOLID WASTES Requirements and Recommended Procedures § 240.200-1 Requirement. In consultation with the responsible agencies, the owner/operator shall determine what wastes shall...
7 CFR 1470.22 - Conservation stewardship plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CONSERVATION STEWARDSHIP PROGRAM Contracts... process as outlined in the National Planning Procedures Handbook to encourage participants to address... the participant's decisions that describes the schedule of conservation activities to be implemented...
40 CFR 63.7733 - What procedures must I use to establish operating limits?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Foundries Initial Compliance Requirements § 63.7733 What procedures must I use to establish operating limits... site-specific operating limits in your operation and maintenance plan according to the procedures in... site-specific operating limit according to the procedures specified in paragraphs (c)(1) and (2) of...
40 CFR 63.7733 - What procedures must I use to establish operating limits?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Initial Compliance Requirements § 63.7733 What procedures must I use to establish operating limits? (a...-specific operating limits in your operation and maintenance plan according to the procedures in paragraphs... site-specific operating limit according to the procedures specified in paragraphs (c)(1) and (2) of...
40 CFR 63.7733 - What procedures must I use to establish operating limits?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Foundries Initial Compliance Requirements § 63.7733 What procedures must I use to establish operating limits... site-specific operating limits in your operation and maintenance plan according to the procedures in... site-specific operating limit according to the procedures specified in paragraphs (c)(1) and (2) of...
40 CFR 63.7733 - What procedures must I use to establish operating limits?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Foundries Initial Compliance Requirements § 63.7733 What procedures must I use to establish operating limits... site-specific operating limits in your operation and maintenance plan according to the procedures in... site-specific operating limit according to the procedures specified in paragraphs (c)(1) and (2) of...
Carbothermal Production of Magnesium: Csiro's Magsonic™ Process
NASA Astrophysics Data System (ADS)
Prentice, Leon H.; Nagle, Michael W.; Barton, Timothy R. D.; Tassios, Steven; Kuan, Benny T.; Witt, Peter J.; Constanti-Carey, Keri K.
Carbothermal production has been recognized as conceptually the simplest and cleanest route to magnesium metal, but has suffered from technical challenges of development and scale-up. Work by CSIRO has now successfully demonstrated the technology using supersonic quenching of magnesium vapor (the MagSonic™ Process). Key barriers to process development have been overcome: the experimental program has achieved sustained operation, no nozzle blockage, minimal reversion, and safe handling of pyrophoric powders. The laboratory equipment has been operated at industrially relevant magnesium vapor concentrations (>25% Mg) for multiple runs with no blockage. Novel computational fluid dynamics (CFD) modeling of the shock quenching and metal vapor condensation has informed nozzle design and is supported by experimental data. Reversion below 10% has been demonstrated, and magnesium successfully purified (>99.9%) from the collected powder. Safe operating procedures have been developed and demonstrated, minimizing the risk of powder explosion. The MagSonic™ Process is now ready to progress to significantly larger scale and continuous operation.
Use of Semi-Autonomous Tools for ISS Commanding and Monitoring
NASA Technical Reports Server (NTRS)
Brzezinski, Amy S.
2014-01-01
As the International Space Station (ISS) has moved into a utilization phase, operations have shifted to become more ground-based with fewer mission control personnel monitoring and commanding multiple ISS systems. This shift to fewer people monitoring more systems has prompted use of semi-autonomous console tools in the ISS Mission Control Center (MCC) to help flight controllers command and monitor the ISS. These console tools perform routine operational procedures while keeping the human operator "in the loop" to monitor and intervene when off-nominal events arise. Two such tools, the Pre-positioned Load (PPL) Loader and Automatic Operators Recorder Manager (AutoORM), are used by the ISS Communications RF Onboard Networks Utilization Specialist (CRONUS) flight control position. CRONUS is responsible for simultaneously commanding and monitoring the ISS Command & Data Handling (C&DH) and Communications and Tracking (C&T) systems. PPL Loader is used to uplink small pieces of frequently changed software data tables, called PPLs, to ISS computers to support different ISS operations. In order to uplink a PPL, a data load command must be built that contains multiple user-input fields. Next, a multiple step commanding and verification procedure must be performed to enable an onboard computer for software uplink, uplink the PPL, verify the PPL has incorporated correctly, and disable the computer for software uplink. PPL Loader provides different levels of automation in both building and uplinking these commands. In its manual mode, PPL Loader automatically builds the PPL data load commands but allows the flight controller to verify and save the commands for future uplink. In its auto mode, PPL Loader automatically builds the PPL data load commands for flight controller verification, but automatically performs the PPL uplink procedure by sending commands and performing verification checks while notifying CRONUS of procedure step completion. If an off-nominal condition occurs during procedure execution, PPL Loader notifies CRONUS through popup messages, allowing CRONUS to examine the situation and choose an option of how PPL loader should proceed with the procedure. The use of PPL Loader to perform frequent, routine PPL uplinks offloads CRONUS to better monitor two ISS systems. It also reduces procedure performance time and decreases risk of command errors. AutoORM identifies ISS communication outage periods and builds commands to lock, playback, and unlock ISS Operations Recorder files. Operation Recorder files are circular buffer files of continually recorded ISS telemetry data. Sections of these files can be locked from further writing, be played back to capture telemetry data that occurred during an ISS loss of signal (LOS) period, and then be unlocked for future recording use. Downlinked Operation Recorder files are used by mission support teams for data analysis, especially if failures occur during LOS. The commands to lock, playback, and unlock Operations Recorder files are encompassed in three different operational procedures and contain multiple user-input fields. AutoORM provides different levels of automation for building and uplinking the commands to lock, playback, and unlock Operations Recorder files. In its automatic mode, AutoORM automatically detects ISS LOS periods, then generates and uplinks the commands to lock, playback, and unlock Operations Recorder files when MCC regains signal with ISS. AutoORM also features semi-autonomous and manual modes which integrate CRONUS more into the command verification and uplink process. AutoORMs ability to automatically detect ISS LOS periods and build the necessary commands to preserve, playback, and release recorded telemetry data greatly offloads CRONUS to perform more high-level cognitive tasks, such as mission planning and anomaly troubleshooting. Additionally, since Operations Recorder commands contain numerical time input fields which are tedious for a human to manually build, AutoORM's ability to automatically build commands reduces operational command errors. PPL Loader and AutoORM demonstrate principles of semi-autonomous operational tools that will benefit future space mission operations. Both tools employ different levels of automation to perform simple and routine procedures, thereby offloading human operators to perform higher-level cognitive tasks. Because both tools provide procedure execution status and highlight off-nominal indications, the flight controller is able to intervene during procedure execution if needed. Semi-autonomous tools and systems that can perform routine procedures, yet keep human operators informed of execution, will be essential in future long-duration missions where the onboard crew will be solely responsible for spacecraft monitoring and control.
ERIC Educational Resources Information Center
Agenbroad, James E.; And Others
Included in this volume of appendices to LI 000 979 are acquisitions flow charts; a current operations questionnaire; an algorithm for splitting the Library of Congress call number; analysis of the Machine-Readable Cataloging (MARC II) format; production problems and decisions; operating procedures for information transmittal in the New England…
Ittenbach, Richard F; Baker, Cynthia L; Corsmo, Jeremy J
2014-05-01
Standard operating procedures (SOPs) were once considered the province of the pharmaceutical industry but are now viewed as a key component of quality assurance programs. To address variability and increase the rigor of clinical data management (CDM) operations, the Cincinnati Children's Hospital Medical Center (CCHMC) decided to create CDM SOPs. In response to this challenge, and as part of a broader institutional initiative, the CCHMC leadership established an executive steering committee to oversee the development and implementation of CDM SOPs. This resulted in the creation of a quality assurance review process with three review panels: an SOP development team (16 clinical data managers and technical staff members), a faculty review panel (8 senior faculty and administrators), and an expert advisory panel (3 national CDM experts). This innovative, tiered review process helped ensure that the new SOPs would be created and implemented in accord with good CDM practices and standards. Twelve fully vetted, institutionally endorsed SOPs and one CDM template resulted from the intensive, iterative 10-month process (December 2011 to early October 2012). Phased implementation, which incoporated the CDM SOPs into the existing audit process for certain types of clinical research studies, was on schedule at the time of this writing. Once CCHMC researchers have had the opportunity to use the SOPs over time and across a broad range of research settings and conditions, the SOPs will be revisited and revalidated.
Modeling operators' emergency response time for chemical processing operations.
Murray, Susan L; Harputlu, Emrah; Mentzer, Ray A; Mannan, M Sam
2014-01-01
Operators have a crucial role during emergencies at a variety of facilities such as chemical processing plants. When an abnormality occurs in the production process, the operator often has limited time to either take corrective actions or evacuate before the situation becomes deadly. It is crucial that system designers and safety professionals can estimate the time required for a response before procedures and facilities are designed and operations are initiated. There are existing industrial engineering techniques to establish time standards for tasks performed at a normal working pace. However, it is reasonable to expect the time required to take action in emergency situations will be different than working at a normal production pace. It is possible that in an emergency, operators will act faster compared to a normal pace. It would be useful for system designers to be able to establish a time range for operators' response times for emergency situations. This article develops a modeling approach to estimate the time standard range for operators taking corrective actions or following evacuation procedures in emergency situations. This will aid engineers and managers in establishing time requirements for operators in emergency situations. The methodology used for this study combines a well-established industrial engineering technique for determining time requirements (predetermined time standard system) and adjustment coefficients for emergency situations developed by the authors. Numerous videos of workers performing well-established tasks at a maximum pace were studied. As an example, one of the tasks analyzed was pit crew workers changing tires as quickly as they could during a race. The operations in these videos were decomposed into basic, fundamental motions (such as walking, reaching for a tool, and bending over) by studying the videos frame by frame. A comparison analysis was then performed between the emergency pace and the normal working pace operations to determine performance coefficients. These coefficients represent the decrease in time required for various basic motions in emergency situations and were used to model an emergency response. This approach will make hazardous operations requiring operator response, alarm management, and evacuation processes easier to design and predict. An application of this methodology is included in the article. The time required for an emergency response was roughly a one-third faster than for a normal response time.
Long-Term Planning for Open Pits for Mining Sulphide-Oxide Ores in Order to Achieve Maximum Profit
NASA Astrophysics Data System (ADS)
Kržanović, Daniel; Conić, Vesna; Stevanović, Dejan; Kolonja, Božo; Vaduvesković, Jovan
2017-12-01
Profitable exploitation of mineralised material from the earth's crust is a complex and difficult task that depends on a comprehensive planning process. Answering the question of how to plan production depends on the geometry of the deposit, as well as the concentration, distribution, and type of minerals in it. The complex nature of mineral deposits largely determines the method of exploitation and profitability of mining operations. In addition to unit operating costs and metal prices, the optimal recovery of and achievement of maximum profit from deposits of sulphide-oxide ores also depend, to a significant extent, on the level of technological recovery achieved in the ore processing procedure. Therefore, in defining a long-term development strategy for open pits, special attention must be paid to the selection of an optimal procedure for ore processing in order to achieve the main objective: maximising the Net Present Value (NPV). The effect of using two different processes, flotation processing and hydrometallurgical methods (bioleaching acid leaching), on determining the ultimate pit is shown in the case of the Kraku Bugaresku-Cementacija sulphide-oxide ore deposit in eastern Serbia. Analysis shows that the application of hydrometallurgical methods of processing sulphide-oxide ore achieved an increase in NPV of 20.42%.
Upgrading the fuel-handling machine of the Novovoronezh nuclear power plant unit no. 5
NASA Astrophysics Data System (ADS)
Terekhov, D. V.; Dunaev, V. I.
2014-02-01
The calculation of safety parameters was carried out in the process of upgrading the fuel-handling machine (FHM) of the Novovoronezh nuclear power plant (NPP) unit no. 5 based on the results of quantitative safety analysis of nuclear fuel transfer operations using a dynamic logical-and-probabilistic model of the processing procedure. Specific engineering and design concepts that made it possible to reduce the probability of damaging the fuel assemblies (FAs) when performing various technological operations by an order of magnitude and introduce more flexible algorithms into the modernized FHM control system were developed. The results of pilot operation during two refueling campaigns prove that the total reactor shutdown time is lowered.
NASA Technical Reports Server (NTRS)
Lohr, Gary W.; Williams, Dan; Abbott, Terence; Baxley, Brian; Greco, Adam; Ridgway, Richard
2005-01-01
The Small Aircraft Transportation System Higher Volume Operations (SATS HVO) concept holds the promise for increased efficiency and throughput at many of the nations under-used airports. This concept allows for concurrent operations at uncontrolled airports that under today s procedures are restricted to one arrival or one departure operation at a time, when current-day IFR separation standards are applied. To allow for concurrent operations, SATS HVO proposes several fundamental changes to today's system. These changes include: creation of dedicated airspace, development of new procedures and communications (phraseologies), and assignment of roles and responsibilities for pilots and controllers, among others. These changes would affect operations on the airborne side (pilot) as well as the groundside (controller and air traffic flow process). The focus of this paper is to discuss some of the issues and potential problems that have been considered in the development of the SATS HVO concept, in particular from the ground side perspective. Reasonable solutions to the issues raised here have been proposed by the SATS HVO team, and are discussed in this paper.
Cold Test Operation of the German VEK Vitrification Plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fleisch, J.; Schwaab, E.; Weishaupt, M.
2008-07-01
In 2007 the German High-Level Liquid Waste (HLLW) Vitrification plant VEK (Verglasungseinrichtung Karlsruhe) has passed a three months integral cold test operation as final step before entering the hot phase. The overall performance of the vitrification process equipment with a liquid-fed ceramic glass melter as main component proved to be completely in line with the requirements of the regulatory body. The retention efficiency of main radioactive-bearing elements across melter and wet off-gas treatment system exceeded the design values distinctly. The strategy to produce a specified waste glass could be successfully demonstrated. The results of the cold test operation allow enteringmore » the next step of hot commissioning, i.e. processing of approximately 2 m{sup 3} of diluted HLLW. In summary: An important step of the VEK vitrification plant towards hot operation has been the performance of the cold test operation from April to July 2007. This first integral operation was carried out under boundary conditions and rules established for radioactive operation. Operation and process control were carried out following the procedure as documented in the licensed operational manuals. The function of the process technology and the safe operation could be demonstrated. No severe problems were encountered. Based on the positive results of the cold test, application of the license for hot operation has been initiated and is expected in the near future. (authors)« less
Mechanization of Cataloging Procedures *
Kilgour, Frederick G.
1965-01-01
The Columbia-Harvard-Yale Medical Libraries Computerization Project has put into operation its mechanized procedure for the production of catalog cards. Cards produced are in final form ready to be filed into a card catalog. Catalogers prepare copy on a worksheet from which punched cards are punched. An IBM 1401 computer processes the decklets of punched cards on magnetic tape to produce the expanded decklets of punched cards needed to print the various packs of catalog cards required to go into different catalogs. Next, the computer punches the expanded decklets of cards to operate an 870 Document Writer, which types out the catalog cards in final form. Cost of cards ready to file is 12.5 cents per card. Images PMID:14271110
NASA Astrophysics Data System (ADS)
Tan, Samantha H.; Chen, Ning; Liu, Shi; Wang, Kefei
2003-09-01
As part of the semiconductor industry "contamination-free manufacturing" effort, significant emphasis has been placed on reducing potential sources of contamination from process equipment and process equipment components. Process tools contain process chambers and components that are exposed to the process environment or process chemistry and in some cases are in direct contact with production wafers. Any contamination from these sources must be controlled or eliminated in order to maintain high process yields, device performance, and device reliability. This paper discusses new nondestructive analytical methods for quantitative measurement of the cleanliness of metal, quartz, polysilicon and ceramic components that are used in process equipment tools. The goal of these new procedures is to measure the effectiveness of cleaning procedures and to verify whether a tool component part is sufficiently clean for installation and subsequent routine use in the manufacturing line. These procedures provide a reliable "qualification method" for tool component certification and also provide a routine quality control method for reliable operation of cleaning facilities. Cost advantages to wafer manufacturing include higher yields due to improved process cleanliness and elimination of yield loss and downtime resulting from the installation of "bad" components in process tools. We also discuss a representative example of wafer contamination having been linked to a specific process tool component.
Representing Operations Procedures Using Temporal Dependency Algorithms
NASA Technical Reports Server (NTRS)
Fayyad, K.; Cooper, L.
1992-01-01
The research presented in this paper is investigating new ways of specifying operations procedures that incorporate the insight of operations, engineering, and science personnel to improve mission operations. The paper describes the rationale for using Temporal Dependency Networks to represent the procedures, a description of how the data is acquired, and the knowledge engineering effort required to represent operations procedures.
On-line identification of fermentation processes for ethanol production.
Câmara, M M; Soares, R M; Feital, T; Naomi, P; Oki, S; Thevelein, J M; Amaral, M; Pinto, J C
2017-07-01
A strategy for monitoring fermentation processes, specifically, simultaneous saccharification and fermentation (SSF) of corn mash, was developed. The strategy covered the development and use of first principles, semimechanistic and unstructured process model based on major kinetic phenomena, along with mass and energy balances. The model was then used as a reference model within an identification procedure capable of running on-line. The on-line identification procedure consists on updating the reference model through the estimation of corrective parameters for certain reaction rates using the most recent process measurements. The strategy makes use of standard laboratory measurements for sugars quantification and in situ temperature and liquid level data. The model, along with the on-line identification procedure, has been tested against real industrial data and have been able to accurately predict the main variables of operational interest, i.e., state variables and its dynamics, and key process indicators. The results demonstrate that the strategy is capable of monitoring, in real time, this complex industrial biomass fermentation. This new tool provides a great support for decision-making and opens a new range of opportunities for industrial optimization.
Orbital operations study. Appendix B: Operational procedures
NASA Technical Reports Server (NTRS)
Galvin, D. M.; Mattson, H. L.; True, D. M.; Anderson, N. R.; Mehrbach, E.; Gianformaggio, A.; Steinwachs, W. L.; Turkel, S. H.
1972-01-01
Operational procedures for each alternate approach for each interfacing activity of the orbital operations study are presented. The applicability of the procedures to interfacing element pairs is identified.
2016-04-04
Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 03-2-827 Test Procedures for Video Target Scoring Using...ABSTRACT This Test Operations Procedure (TOP) describes typical equipment and procedures to setup and operate a Video Target Scoring System (VTSS) to...lights. 15. SUBJECT TERMS Video Target Scoring System, VTSS, witness screens, camera, target screen, light pole 16. SECURITY
Control of Technology Transfer at JPL
NASA Technical Reports Server (NTRS)
Oliver, Ronald
2006-01-01
Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software
NASA Astrophysics Data System (ADS)
Koike, Hiroki; Ohsawa, Takashi; Miura, Sadahiko; Honjo, Hiroaki; Ikeda, Shoji; Hanyu, Takahiro; Ohno, Hideo; Endoh, Tetsuo
2015-04-01
A spintronic-based power-gated micro-processing unit (MPU) is proposed. It includes a power control circuit activated by the newly supported power-off instruction for the deep-sleep mode. These means enable the power-off procedure for the MPU to be executed appropriately. A test chip was designed and fabricated using 90 nm CMOS and an additional 100 nm MTJ process; it was successfully operated. The guideline of the energy reduction effects for this MPU was presented, using the estimation based on the measurement results of the test chip. The result shows that a large operation energy reduction of 1/28 can be achieved when the operation duty is 10%, under the condition of a sufficient number of idle clock cycles.
Gil-Cerezo, V; Domínguez-Vilches, E; González-Barrios, A J
2017-05-01
This paper presents the results of implementing an extrajudicial environmental mediation procedure in the socioenvironmental conflict associated with routine operation of the El Cabril Disposal Facility for low- and medium- activity radioactive waste (Spain). We analyse the socio-ethical perspective of this facility's operation with regard to its nearby residents, detailing the structure and development of the environmental mediation procedure through the participation of society and interested parties who are or may become involved in such a conflict. The research, action, and participation method was used to apply the environmental mediation procedure. This experience provides lessons that could help improve decision-making processes in nuclear or radioactive facility decommissioning projects or in environmental remediation projects dealing with ageing facilities or with those in which nuclear or radioactive accidents/incidents may have occurred. Copyright © 2017 Elsevier Ltd. All rights reserved.
[Implementation of modern operating room management -- experiences made at an university hospital].
Hensel, M; Wauer, H; Bloch, A; Volk, T; Kox, W J; Spies, C
2005-07-01
Caused by structural changes in health care the general need for cost control is evident for all hospitals. As operating room is one of the most cost-intensive sectors in a hospital, optimisation of workflow processes in this area is of particular interest for health care providers. While modern operating room management is established in several clinics yet, others are less prepared for economic challenges. Therefore, the operating room statute of the Charité university hospital useful for other hospitals to develop an own concept is presented. In addition, experiences made with implementation of new management structures are described and results obtained over the last 5 years are reported. Whereas the total number of operation procedures increased by 15 %, the operating room utilization increased more markedly in terms of time and cases. Summarizing the results, central operating room management has been proved to be an effective tool to increase the efficiency of workflow processes in the operating room.
14 CFR 1274.912 - Patent rights-retention by the recipient (large business).
Code of Federal Regulations, 2010 CFR
2010-01-01
...; to practice, in the case of a process or method; or to operate, in case of a machine or system; and... complied with the procedures. (2) If the Agreement Officer learns of an unreported Recipient invention that...
NEW GIS WATERSHED ANALYSIS TOOLS FOR SOIL CHARACTERIZATION AND EROSION AND SEDIMENTATION MODELING
A comprehensive procedure for computing soil erosion and sediment delivery metrics has been developed which utilizes a suite of automated scripts and a pair of processing-intensive executable programs operating on a personal computer platform.
ERIC Educational Resources Information Center
Day, C. William
1999-01-01
Examines the planning process to identify equipment or systems within an educational facility that could be Y2K sensitive. Discusses developing a contingency plan to prevent operational shutdown. Concluding comments describe a simple Y2K equipment-testing procedure. (GR)
14 CFR 1274.912 - Patent rights-retention by the recipient (large business).
Code of Federal Regulations, 2013 CFR
2013-01-01
...; to practice, in the case of a process or method; or to operate, in case of a machine or system; and... complied with the procedures. (2) If the Agreement Officer learns of an unreported Recipient invention that...
14 CFR 1274.912 - Patent rights-retention by the recipient (large business).
Code of Federal Regulations, 2012 CFR
2012-01-01
...; to practice, in the case of a process or method; or to operate, in case of a machine or system; and... complied with the procedures. (2) If the Agreement Officer learns of an unreported Recipient invention that...
Developing an orientation program.
Edwards, K
1999-01-01
When the local area experienced tremendous growth and change, the radiology department at Maury Hospital in Columbia, Tennessee looked seriously at its orientation process in preparation for hiring additional personnel. It was an appropriate time for the department to review its orientation process and to develop a manual to serve as both a tool for supervisors and an ongoing reference for new employees. To gather information for the manual, supervisors were asked to identify information they considered vital for new employees to know concerning the daily operations of the department, its policies and procedures, the organizational structure of the hospital, and hospital and departmental computer systems. That information became the basis of the orientation manual, and provided an introduction to the hospital and radiology department; the structure of the organization; an overview of the radiology department; personnel information; operating procedures and computer systems; and various policies and procedures. With the manual complete, the radiology department concentrated on an orientation process that would meet the needs of supervisors who said they had trouble remembering the many details necessary to teach new employees. A pre-orientation checklist was developed, which contained the many details supervisors must handle between the time an employee is hired and arrives for work. The next step was the creation of a checklist for use by the supervisor during a new employee's first week on the job. A final step in the hospital's orientation program is to have each new employee evaluate the entire orientation process. That information is then used to update and revise the manual.
The Triangle of the Space Launch System Operations
NASA Astrophysics Data System (ADS)
Fayolle, Eric
2010-09-01
Firemen know it as “fire triangle”, mathematicians know it as “golden triangle”, sailormen know it as “Bermuda triangle”, politicians know it as “Weimar triangle”… This article aims to present a new aspect of that shape geometry in the space launch system world: “the triangle of the space launch system operations”. This triangle is composed of these three following topics, which have to be taken into account for any space launch system operation processing: design, safety and operational use. Design performance is of course taking into account since the early preliminary phase of a system development. This design performance is matured all along the development phases, thanks to consecutives iterations in order to respect the financial and timing constraints imposed to the development of the system. This process leads to a detailed and precise design to assess the required performance. Then, the operational use phase brings its batch of constraints during the use of the system. This phase is conducted by specific procedures for each operation. Each procedure has sequences for each sub-system, which have to be conducted in a very precise chronological way. These procedures can be processed by automatic way or manual way, with the necessity or not of the implication of operators, and in a determined environment. Safeguard aims to verify the respect of the specific constraints imposed to guarantee the safety of persons and property, the protection of public health and the environment. Safeguard has to be taken into account above the operational constraints of any space operation, without forgetting the highest safety level for the operators of the space operation, and of course without damaging the facilities or without disturbing the external environment. All space operations are the result of a “win-win” compromise between these three topics. Contrary to the fire triangle where one of the topics has to be suppressed in order to avoid the combustion, no topics at all should be suppressed in the triangle of the space launch system operations. Indeed, if safeguard is not considered since the beginning of the development phase, this development will not take into account safeguard constraints. Then, the operational phase will become very difficult because unavailable, to respect safety rules required for the operational use phase of the system. Taking into account safeguard constraints in late project phases will conduct to very high operational constraints, sometimes quite disturbing for the operator, even blocking to be able to consider the operational use phase as mature and optimized. On the contrary, if design performance is not taken into account in order to favor safeguard aspect in the operational use phase, system design will not be optimized, what will lead to high planning and timing impacts. The examples detailed in this article show the compromise for what each designer should confront with during the development of any system dealing with the safety of persons and property, the protection of public health and the environment.
In-office vs. operating room procedures for recurrent respiratory papillomatosis.
Miller, Anya J; Gardner, Glendon M
2017-01-01
We conducted a study to analyze hospital and patient costs, outcomes, and patient satisfaction among adults undergoing in-office and operating room procedures for the treatment of recurrent respiratory papillomatosis. Our final study population was made up of 17 patients-1 man and 16 women, aged 30 to 86 years (mean: 62). The mean number of in-office laser procedures per patient was 4.2, and the mean interval between procedures was 5.4 months (although 10 patients underwent only 1 office procedure); the mean number of operating room procedures was 13.5, and the mean interval between procedures was 14.3 months. An equal number of patients reported complications or adverse events with the two types of procedures-5 each. The difference in cost between the office procedure (mean: $3,413.00) and the operating room procedure (mean: $12,382.59) was almost $9,000, but these savings were offset by the fact that the office procedures needed to be performed three times as often. Patients reported slightly more anxiety and discomfort during the office procedures and, overall, they appeared to prefer the operating room procedure. We conclude that office procedures are significantly more cost-effective than operating room procedures, but their use may be limited by patient tolerance and the increased frequency of the procedure.
NASA Astrophysics Data System (ADS)
Amalia, A.; Rachmawati, D.; Lestari, I. A.; Mourisa, C.
2018-03-01
Colposcopy has been used primarily to diagnose pre-cancer and cancerous lesions because this procedure gives an exaggerated view of the tissues of the vagina and the cervix. But, the poor quality of colposcopy image sometimes makes physician challenging to recognize and analyze it. Generally, Implementation of image processing to identify cervical cancer have to implement a complex classification or clustering method. In this study, we wanted to prove that by only applying the identification of edge detection in the colposcopy image, identification of cervical cancer can be determined. In this study, we implement and comparing two edge detection operator which are isotropic and canny operator. Research methodology in this paper composed by image processing, training, and testing stages. In the image processing step, colposcopy image transformed by nth root power transformation to get better detection result and continued with edge detection process. Training is a process of labelling all dataset image with cervical cancer stage. This process involved pathology doctor as an expert in diagnosing the colposcopy image as a reference. Testing is a process of deciding cancer stage classification by comparing the similarity image of colposcopy results in the testing stage with the image of the results of the training process. We used 30 images as a dataset. The result gets same accuracy which is 80% for both Canny or Isotropic operator. Average running time for Canny operator implementation is 0.3619206 ms while Isotropic get 1.49136262 ms. The result showed that Canny operator is better than isotropic operator because Canny operator generates a more precise edge with a fast time instead.
Thermochemical water decomposition processes
NASA Technical Reports Server (NTRS)
Chao, R. E.
1974-01-01
Thermochemical processes which lead to the production of hydrogen and oxygen from water without the consumption of any other material have a number of advantages when compared to other processes such as water electrolysis. It is possible to operate a sequence of chemical steps with net work requirements equal to zero at temperatures well below the temperature required for water dissociation in a single step. Various types of procedures are discussed, giving attention to halide processes, reverse Deacon processes, iron oxide and carbon oxide processes, and metal and alkali metal processes. Economical questions are also considered.
Bernini, Patrizia; Bertini, Ivano; Luchinat, Claudio; Nincheri, Paola; Staderini, Samuele; Turano, Paola
2011-04-01
(1)H NMR metabolic profiling of urine, serum and plasma has been used to monitor the impact of the pre-analytical steps on the sample quality and stability in order to propose standard operating procedures (SOPs) for deposition in biobanks. We analyzed the quality of serum and plasma samples as a function of the elapsed time (t = 0-4 h) between blood collection and processing and of the time from processing to freezing (up to 24 h). The stability of the urine metabolic profile over time (up to 24 h) at various storage temperatures was monitored as a function of the different pre-analytical treatments like pre-storage centrifugation, filtration, and addition of the bacteriostatic preservative sodium azide. Appreciable changes in the profiles, reflecting changes in the concentration of a number of metabolites, were detected and discussed in terms of chemical and enzymatic reactions for both blood and urine samples. Appropriate procedures for blood derivatives collection and urine preservation/storage that allow maintaining as much as possible the original metabolic profile of the fresh samples emerge, and are proposed as SOPs for biobanking.
Lane, S D; Clow, J K; Innis, A; Critchfield, T S
1998-01-01
This study employed a stimulus-class rating procedure to explore whether stimulus equivalence and stimulus generalization can combine to promote the formation of open-ended categories incorporating cross-modal stimuli. A pretest of simple auditory discrimination indicated that subjects (college students) could discriminate among a range of tones used in the main study. Before beginning the main study, 10 subjects learned to use a rating procedure for categorizing sets of stimuli as class consistent or class inconsistent. After completing conditional discrimination training with new stimuli (shapes and tones), the subjects demonstrated the formation of cross-modal equivalence classes. Subsequently, the class-inclusion rating procedure was reinstituted, this time with cross-modal sets of stimuli drawn from the equivalence classes. On some occasions, the tones of the equivalence classes were replaced by novel tones. The probability that these novel sets would be rated as class consistent was generally a function of the auditory distance between the novel tone and the tone that was explicitly included in the equivalence class. These data extend prior work on generalization of equivalence classes, and support the role of operant processes in human category formation. PMID:9821680
40 CFR 63.145 - Process wastewater provisions-test methods and procedures to determine compliance.
Code of Federal Regulations, 2014 CFR
2014-07-01
... § 63.138 of this subpart. Owners or operators conducting a design evaluation shall comply with the...) Performance tests and design evaluations for treatment processes. If design steam stripper option (§ 63.138(d)) or RCRA option (§ 63.138(h)) is selected to comply with § 63.138, neither a design evaluation nor a...
40 CFR 63.145 - Process wastewater provisions-test methods and procedures to determine compliance.
Code of Federal Regulations, 2012 CFR
2012-07-01
... § 63.138 of this subpart. Owners or operators conducting a design evaluation shall comply with the...) Performance tests and design evaluations for treatment processes. If design steam stripper option (§ 63.138(d)) or RCRA option (§ 63.138(h)) is selected to comply with § 63.138, neither a design evaluation nor a...
40 CFR 63.145 - Process wastewater provisions-test methods and procedures to determine compliance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... § 63.138 of this subpart. Owners or operators conducting a design evaluation shall comply with the...) Performance tests and design evaluations for treatment processes. If design steam stripper option (§ 63.138(d)) or RCRA option (§ 63.138(h)) is selected to comply with § 63.138, neither a design evaluation nor a...
Small-Item Vapor Test Method, FY11 Release
2012-07-01
to this test procedure is provided alphabetically in the following list: absorption: The uptake of a contaminant INTO the volume of a material. The... powders , wipes), or gas-phase (fumigants, including aerosols). decontamination process: The process of making any person, object, or area safe by...with another contaminant. Generally, bare metals and glass are nonsorptive materials for some agents. operational decontamination: Decontamination
Bioreactor performance: a more scientific approach for practice.
Lübbert, A; Bay Jørgensen, S
2001-02-13
In practice, the performance of a biochemical conversion process, i.e. the bioreactor performance, is essentially determined by the benefit/cost ratio. The benefit is generally defined in terms of the amount of the desired product produced and its market price. Cost reduction is the major objective in biochemical engineering. There are two essential engineering approaches to minimizing the cost of creating a particular product in an existing plant. One is to find a control path or operational procedure that optimally uses the dynamics of the process and copes with the many constraints restricting production. The other is to remove or lower the constraints by constructive improvements of the equipment and/or the microorganisms. This paper focuses on the first approach, dealing with optimization of the operational procedure and the measures by which one can ensure that the process adheres to the predetermined path. In practice, feedforward control is the predominant control mode applied. However, as it is frequently inadequate for optimal performance, feedback control may also be employed. Relevant aspects of such performance optimization are discussed.
A procedure for automated land use mapping using remotely sensed multispectral scanner data
NASA Technical Reports Server (NTRS)
Whitley, S. L.
1975-01-01
A system of processing remotely sensed multispectral scanner data by computer programs to produce color-coded land use maps for large areas is described. The procedure is explained, the software and the hardware are described, and an analogous example of the procedure is presented. Detailed descriptions of the multispectral scanners currently in use are provided together with a summary of the background of current land use mapping techniques. The data analysis system used in the procedure and the pattern recognition software used are functionally described. Current efforts by the NASA Earth Resources Laboratory to evaluate operationally a less complex and less costly system are discussed in a separate section.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-23
... specifications and operating instructions, if available, or standard operating procedures must be developed by... manufacturer's specifications and operating instructions, if available, or standard operating procedures must... operating specifications or standard operating procedures developed by the prepared feeds manufacturer be...
Experimental and numerical research on forging with torsion
NASA Astrophysics Data System (ADS)
Petrov, Mikhail A.; Subich, Vadim N.; Petrov, Pavel A.
2017-10-01
Increasing the efficiency of the technological operations of blank production is closely related to the computer-aided technologies (CAx). On the one hand, the practical result represents reality exactly. On the other hand, the development procedure of new process development demands unrestricted resources, which are limited on the SMEs. The tools of CAx were successfully applied for development of new process of forging with torsion and result analysis as well. It was shown, that the theoretical calculations find the confirmation both in praxis and during numerical simulation. The mostly used constructional materials were under study. The torque angles were stated. The simulated results were evaluated by experimental procedure.
NASA Technical Reports Server (NTRS)
Leach, Ronald J.
1997-01-01
The purpose of this project was to study the feasibility of reusing major components of a software system that had been used to control the operations of a spacecraft launched in the 1980s. The study was done in the context of a ground data processing system that was to be rehosted from a large mainframe to an inexpensive workstation. The study concluded that a systematic approach using inexpensive tools could aid in the reengineering process by identifying a set of certified reusable components. The study also developed procedures for determining duplicate versions of software, which were created because of inadequate naming conventions. Such procedures reduced reengineering costs by approximately 19.4 percent.
Komatsu, Shohei; Scatton, Olivier; Goumard, Claire; Sepulveda, Ailton; Brustia, Raffaele; Perdigao, Fabiano; Soubrane, Olivier
2017-05-01
Laparoscopic hepatectomy continues to be a challenging operation associated with a steep learning curve. This study aimed to evaluate the learning process during 15 years of experience with laparoscopic hepatectomy and to identify approaches to standardization of this procedure. Prospectively collected data of 317 consecutive laparoscopic hepatectomies performed from January 2000 to December 2014 were reviewed retrospectively. The operative procedures were classified into 4 categories (minor hepatectomy, left lateral sectionectomy [LLS], left hepatectomy, and right hepatectomy), and indications were classified into 5 categories (benign-borderline tumor, living donor, metastatic liver tumor, biliary malignancy, and hepatocellular carcinoma). During the first 10 years, the procedures were limited mainly to minor hepatectomy and LLS, and the indications were limited to benign-borderline tumor and living donor. Implementation of major hepatectomy rapidly increased the proportion of malignant tumors, especially hepatocellular carcinoma, starting from 2011. Conversion rates decreased with experience for LLS (13.3% vs 3.4%; p = 0.054) and left hepatectomy (50.0% vs 15.0%; p = 0.012), but not for right hepatectomy (41.4% vs 35.7%; p = 0.661). Our 15-year experience clearly demonstrates the stepwise procedural evolution from LLS through left hepatectomy to right hepatectomy, as well as the trend in indications from benign-borderline tumor/living donor to malignant tumors. In contrast to LLS and left hepatectomy, a learning curve was not observed for right hepatectomy. The ongoing development process can contribute to faster standardization necessary for future advances in laparoscopic hepatectomy. Copyright © 2017 American College of Surgeons. Published by Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Kuehn, T. J.; Nawrocki, P. M.
1978-01-01
It is suggested that federal programs for hastening the adoption of alternative energy sources must operate within the free market structure. Five phases of the free market commercialization process are described. Federal role possibilities include information dissemination and funding to stimulate private sector activities within these five phases, and federally sponsored procedures for accelerating commercialization of solar thermal small power systems are considered.
1996-11-22
consolidation of financial statements , and for an automated process to transfer financial statement data from the Central Data Base to a... consolidation of financial statements . The Deputy Chief Financial Officer also indicated that the DFAS Cleveland Center approved a system change request...ently is developing Standard Operating Procedures to ensure consistency and standardization in the adjustment and consolidation of financial statements .
LV software support for supersonic flow analysis
NASA Technical Reports Server (NTRS)
Bell, William A.
1991-01-01
During 1991, the software developed allowed an operator to configure and checkout the TSI, Inc. laser velocimeter (LV) system prior to a run. This setup procedure established the operating conditions for the TSI MI-990 multichannel interface and the RMR-1989 rotating machinery resolver. In addition to initializing the instruments, the software package provides a means of specifying LV calibration constants, controlling the sampling process, and identifying the test parameters.
Systems engineering considerations for operational support systems
NASA Technical Reports Server (NTRS)
Aller, Robert O.
1993-01-01
Operations support as considered here is the infrastructure of people, procedures, facilities and systems that provide NASA with the capability to conduct space missions. This infrastructure involves most of the Centers but is concentrated principally at the Johnson Space Center, the Kennedy Space Center, the Goddard Space Flight Center, and the Jet Propulsion Laboratory. It includes mission training and planning, launch and recovery, mission control, tracking, communications, data retrieval and data processing.
Huang, Huajun; Xiang, Chunling; Zeng, Canjun; Ouyang, Hanbin; Wong, Kelvin Kian Loong; Huang, Wenhua
2015-12-01
We improved the geometrical modeling procedure for fast and accurate reconstruction of orthopedic structures. This procedure consists of medical image segmentation, three-dimensional geometrical reconstruction, and assignment of material properties. The patient-specific orthopedic structures reconstructed by this improved procedure can be used in the virtual surgical planning, 3D printing of real orthopedic structures and finite element analysis. A conventional modeling consists of: image segmentation, geometrical reconstruction, mesh generation, and assignment of material properties. The present study modified the conventional method to enhance software operating procedures. Patient's CT images of different bones were acquired and subsequently reconstructed to give models. The reconstruction procedures were three-dimensional image segmentation, modification of the edge length and quantity of meshes, and the assignment of material properties according to the intensity of gravy value. We compared the performance of our procedures to the conventional procedures modeling in terms of software operating time, success rate and mesh quality. Our proposed framework has the following improvements in the geometrical modeling: (1) processing time: (femur: 87.16 ± 5.90 %; pelvis: 80.16 ± 7.67 %; thoracic vertebra: 17.81 ± 4.36 %; P < 0.05); (2) least volume reduction (femur: 0.26 ± 0.06 %; pelvis: 0.70 ± 0.47, thoracic vertebra: 3.70 ± 1.75 %; P < 0.01) and (3) mesh quality in terms of aspect ratio (femur: 8.00 ± 7.38 %; pelvis: 17.70 ± 9.82 %; thoracic vertebra: 13.93 ± 9.79 %; P < 0.05) and maximum angle (femur: 4.90 ± 5.28 %; pelvis: 17.20 ± 19.29 %; thoracic vertebra: 3.86 ± 3.82 %; P < 0.05). Our proposed patient-specific geometrical modeling requires less operating time and workload, but the orthopedic structures were generated at a higher rate of success as compared with the conventional method. It is expected to benefit the surgical planning of orthopedic structures with less operating time and high accuracy of modeling.
NASA Astrophysics Data System (ADS)
Watanabe, Satoru; Tanaka, Masafumi; Wada, Yoshiro; Yanagihara, Dai; Tsujimoto, Naoya; Suzuki, Hideki; Kawai, Noriyo; Yamashita, Masamichi; Nagaoka, Shunji; Shoji, Takatoshi; Higashino, Shinichiro; Sudoh, Hideo
As the second telescience testbed experiment we were examined sophisticated processes of biomedical experiment, such as an implantation of a transmitter into the hmster's abdominal cavity, non-stressful blood sampling, large amountof blood collection, muscle extirpation and biopsy from the hamsters on Feburay 6-8, 1990. To make clear the differences between successful results obtained by an experienced hand and by a non-experienced one, three operators wereselected for three successive experimental days; an engineer who had never experienced any biological experiment, a non-biology student, who experienced on biological experiments, and a veterinary surgeon. Surgical procedures need much experiences on maneuvering and understanding of theory to shorten the elapse time. Especially for a non-experienced hand, graphic instructions were much helpful to understand and to maneuver the procedures. Continuous recordings of ECG from a operator and PIs were of an advantage to grasp an extent of the mental strain, which was compared with their reports requested after end of each experimental day. The mental strain was not related to degrees of scientific achievement, but showed faithfully difficulty of each experimental procedure. Training effects on PIs in successive experimental days were found in their instructions for the operator to let understand the procedures.
Pascual, Carlos; Luján, Marcos; Mora, José Ramón; Chiva, Vicente; Gamarra, Manuela
2015-01-01
The implantation of total quality management models in clinical departments can better adapt to the 2009 ISO 9004 model. An essential part of implantation of these models is the establishment of processes and their stabilization. There are four types of processes: key, management, support and operative (clinical). Management processes have four parts: process stabilization form, process procedures form, medical activities cost estimation form and, process flow chart. In this paper we will detail the creation of an essential process in a surgical department, such as the process of management of the surgery waiting list.
Best, Rebecca R; Harris, Benjamin H L; Walsh, Jason L; Manfield, Timothy
2017-05-08
Drowning is one of the leading causes of death in children. Resuscitating a child following submersion is a high-pressure situation, and standard operating procedures can reduce error. Currently, the Resuscitation Council UK guidance does not include a standard operating procedure on pediatric drowning. The objective of this project was to design a standard operating procedure to improve outcomes of drowned children. A literature review on the management of pediatric drowning was conducted. Relevant publications were used to develop a standard operating procedure for management of pediatric drowning. A concise standard operating procedure was developed for resuscitation following pediatric submersion. Specific recommendations include the following: the Heimlich maneuver should not be used in this context; however, prolonged resuscitation and therapeutic hypothermia are recommended. This standard operating procedure is a potentially useful adjunct to the Resuscitation Council UK guidance and should be considered for incorporation into its next iteration.
21 CFR 821.25 - Device tracking system and content requirements: manufacturer requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... accordance with its standard operating procedure of the information identified in paragraphs (a)(1), (a)(2... shall establish a written standard operating procedure for the collection, maintenance, and auditing of... standard operating procedure: (1) Data collection and recording procedures, which shall include a procedure...
Design, fabrication and characterization of a poly-silicon PN junction
NASA Astrophysics Data System (ADS)
Tower, Jason D.
This thesis details the design, fabrication, and characterization of a PN junction formed from p-type mono-crystalline silicon and n-type poly-crystalline silicon. The primary product of this project was a library of standard operating procedures (SOPs) for the fabrication of such devices, laying the foundations for future work and the development of a class in fabrication processes. The fabricated PN junction was characterized; in particular its current-voltage relationship was measured and fit to models. This characterization was to determine whether or not the fabrication process could produce working PN junctions with acceptable operational parameters.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, M.; Anderson, D.P.
1988-01-01
Marionette is a system for distributed parallel programming in an environment of networked heterogeneous computer systems. It is based on a master/slave model. The master process can invoke worker operations (asynchronous remote procedure calls to single slaves) and context operations (updates to the state of all slaves). The master and slaves also interact through shared data structures that can be modified only by the master. The master and slave processes are programmed in a sequential language. The Marionette runtime system manages slave process creation, propagates shared data structures to slaves as needed, queues and dispatches worker and context operations, andmore » manages recovery from slave processor failures. The Marionette system also includes tools for automated compilation of program binaries for multiple architectures, and for distributing binaries to remote fuel systems. A UNIX-based implementation of Marionette is described.« less
Operations planning simulation: Model study
NASA Technical Reports Server (NTRS)
1974-01-01
The use of simulation modeling for the identification of system sensitivities to internal and external forces and variables is discussed. The technique provides a means of exploring alternate system procedures and processes, so that these alternatives may be considered on a mutually comparative basis permitting the selection of a mode or modes of operation which have potential advantages to the system user and the operator. These advantages are measurements is system efficiency are: (1) the ability to meet specific schedules for operations, mission or mission readiness requirements or performance standards and (2) to accomplish the objectives within cost effective limits.
Computerizing Maintenance Management Improves School Processes.
ERIC Educational Resources Information Center
Conroy, Pat
2002-01-01
Describes how a Computerized Maintenance Management System (CMMS), a centralized maintenance operations database that facilitates work order procedures and staff directives, can help individual school campuses and school districts to manage maintenance. Presents the benefits of CMMS and things to consider in CMMS selection. (EV)
11 CFR 4.5 - Categories of exemptions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... business information which concerns or relates to the trade secrets, processes, operations, style of work... by law to disclose such information. These procedures shall be used for submitting business... offer to submit, business information which a submitter desires to be treated as confidential under...
77 FR 53841 - Amador County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-04
... Self-Determination Act (Pub. L. 112-141) (the Act) and operates in compliance with the Federal Advisory...'s processes and procedures, review applications, and make recommendations for projects to be.... Written comments may be submitted as described under SUPPLEMENTARY INFORMATION. All comments, including...
The report briefly describes the fundamental mechanisms and limiting factors involved in the electrostatic precipitation process. It discusses theories and procedures used in the computer model to describe the physical mechanisms, and generally describes the major operations perf...
Administrator Evaluation--Planning and Process.
ERIC Educational Resources Information Center
Sweeney, Jim
1981-01-01
Discusses five tasks basic to effective administrator evaluation: development of district philosophy; identification of activities crucial to school success; determination of operational procedures; utilization of forms and records which reflect district philosophy; and examination of the components of the system during a trial period. (JD)
Code of Federal Regulations, 2010 CFR
2010-04-01
... for examination and copying, or furnishing a copy of records. Duplication refers to the process of... organization, functions, policies, decisions, procedures, operations, or other activities of the Government or... make their products available for purchase or subscription by the general public. In the case of...
14 CFR § 1274.912 - Patent rights-retention by the recipient (large business).
Code of Federal Regulations, 2014 CFR
2014-01-01
...; to practice, in the case of a process or method; or to operate, in case of a machine or system; and... complied with the procedures. (2) If the Agreement Officer learns of an unreported Recipient invention that...
Hassanain, Mazen; Zamakhshary, Mohammed; Farhat, Ghada; Al-Badr, Ahmed
2017-04-01
The objective of this study was to assess whether an intervention on process efficiency using the Lean methodology leads to improved utilization of the operating room (OR), as measured by key performance metrics of OR efficiency. A quasi-experimental design was used to test the impact of the intervention by comparing pre-intervention and post-intervention data on five key performance indicators. The ORs of 12 hospitals were selected across regions of the Kingdom of Saudi Arabia (KSA). The participants were patients treated at these hospitals during the study period. The intervention comprised the following: (i) creation of visual dashboards that enable starting the first case on time; (ii) use of computerized surgical list management; (iii) optimization of time allocation; (iv) development of an operating model with policies and procedures for the pre-anesthesia clinic; and (iv) creation of a governance structure with policies and procedures for day surgeries. The following were the main outcome measures: on-time start for the first case, room turnover times, percent of overrun cases, average weekly procedure volume and OR utilization. The hospital exhibited statistically significant improvements in the following performance metrics: on-time start for the first case, room turnover times and percent of overrun cases. A statistically significant difference in OR utilization or average weekly procedure volumes was not detected. The implementation of a Lean-based intervention targeting process efficiency applied in ORs across various KSA hospitals resulted in encouraging results on some metrics at some sites, suggesting that the approach has the potential to produce significant benefit in the future. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.
NASA Astrophysics Data System (ADS)
Margarit, G.
2013-12-01
This paper presents the results obtained by GMV in the maritime surveillance operational activations conducted in a set of research projects. These activations have been actively supported by users, which feedback has been essential for better understanding their needs and the most urgent requested improvements. Different domains have been evaluated from pure theoretical and scientific background (in terms of processing algorithms) up to pure logistic issues (IT configuration issues, strategies for improving system performance and avoiding bottlenecks, parallelization and back-up procedures). In all the cases, automatizing is the key work because users need almost real time operations where the interaction of human operators is minimized. In addition, automatizing permits reducing human-derived errors and provides better error tracking procedures. In the paper, different examples will be depicted and analysed. For sake of space limitation, only the most representative ones will be selected. Feedback from users will be include and analysed as well.
Guidebook for solar process-heat applications
NASA Astrophysics Data System (ADS)
Fazzolare, R.; Mignon, G.; Campoy, L.; Luttmann, F.
1981-01-01
The potential for solar process heat in Arizona and some of the general technical aspects of solar, such as insolation, siting, and process analysis are explored. Major aspects of a solar plant design are presented. Collectors, storage, and heat exchange are discussed. Reducing hardware costs to annual dollar benefits is also discussed. Rate of return, cash flow, and payback are discussed as they relate to solar systems. Design analysis procedures are presented. The design cost optimization techniques using a yearly computer simulation of a solar process operation is demonstrated.
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
Strategies for concurrent processing of complex algorithms in data driven architectures
NASA Technical Reports Server (NTRS)
Stoughton, John W.; Mielke, Roland R.; Som, Sukhamony
1990-01-01
The performance modeling and enhancement for periodic execution of large-grain, decision-free algorithms in data flow architectures is examined. Applications include real-time implementation of control and signal processing algorithms where performance is required to be highly predictable. The mapping of algorithms onto the specified class of data flow architectures is realized by a marked graph model called ATAMM (Algorithm To Architecture Mapping Model). Performance measures and bounds are established. Algorithm transformation techniques are identified for performance enhancement and reduction of resource (computing element) requirements. A systematic design procedure is described for generating operating conditions for predictable performance both with and without resource constraints. An ATAMM simulator is used to test and validate the performance prediction by the design procedure. Experiments on a three resource testbed provide verification of the ATAMM model and the design procedure.
Strategies for concurrent processing of complex algorithms in data driven architectures
NASA Technical Reports Server (NTRS)
Som, Sukhamoy; Stoughton, John W.; Mielke, Roland R.
1990-01-01
Performance modeling and performance enhancement for periodic execution of large-grain, decision-free algorithms in data flow architectures are discussed. Applications include real-time implementation of control and signal processing algorithms where performance is required to be highly predictable. The mapping of algorithms onto the specified class of data flow architectures is realized by a marked graph model called algorithm to architecture mapping model (ATAMM). Performance measures and bounds are established. Algorithm transformation techniques are identified for performance enhancement and reduction of resource (computing element) requirements. A systematic design procedure is described for generating operating conditions for predictable performance both with and without resource constraints. An ATAMM simulator is used to test and validate the performance prediction by the design procedure. Experiments on a three resource testbed provide verification of the ATAMM model and the design procedure.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johanna H Oxstrand; Katya L Le Blanc
The nuclear industry is constantly trying to find ways to decrease the human error rate, especially the human errors associated with procedure use. As a step toward the goal of improving procedure use performance, researchers, together with the nuclear industry, have been looking at replacing the current paper-based procedures with computer-based procedure systems. The concept of computer-based procedures is not new by any means; however most research has focused on procedures used in the main control room. Procedures reviewed in these efforts are mainly emergency operating procedures and normal operating procedures. Based on lessons learned for these previous efforts wemore » are now exploring a more unknown application for computer based procedures - field procedures, i.e. procedures used by nuclear equipment operators and maintenance technicians. The Idaho National Laboratory, the Institute for Energy Technology, and participants from the U.S. commercial nuclear industry are collaborating in an applied research effort with the objective of developing requirements and specifications for a computer-based procedure system to be used by field operators. The goal is to identify the types of human errors that can be mitigated by using computer-based procedures and how to best design the computer-based procedures to do this. The underlying philosophy in the research effort is “Stop – Start – Continue”, i.e. what features from the use of paper-based procedures should we not incorporate (Stop), what should we keep (Continue), and what new features or work processes should be added (Start). One step in identifying the Stop – Start – Continue was to conduct a baseline study where affordances related to the current usage of paper-based procedures were identified. The purpose of the study was to develop a model of paper based procedure use which will help to identify desirable features for computer based procedure prototypes. Affordances such as note taking, markups, sharing procedures between fellow coworkers, the use of multiple procedures at once, etc. were considered. The model describes which affordances associated with paper based procedures should be transferred to computer-based procedures as well as what features should not be incorporated. The model also provides a means to identify what new features not present in paper based procedures need to be added to the computer-based procedures to further enhance performance. The next step is to use the requirements and specifications to develop concepts and prototypes of computer-based procedures. User tests and other data collection efforts will be conducted to ensure that the real issues with field procedures and their usage are being addressed and solved in the best manner possible. This paper describes the baseline study, the construction of the model of procedure use, and the requirements and specifications for computer-based procedures that were developed based on the model. It also addresses how the model and the insights gained from it were used to develop concepts and prototypes for computer based procedures.« less
In-Trail Procedure Air Traffic Control Procedures Validation Simulation Study
NASA Technical Reports Server (NTRS)
Chartrand, Ryan C.; Hewitt, Katrin P.; Sweeney, Peter B.; Graff, Thomas J.; Jones, Kenneth M.
2012-01-01
In August 2007, Airservices Australia (Airservices) and the United States National Aeronautics and Space Administration (NASA) conducted a validation experiment of the air traffic control (ATC) procedures associated with the Automatic Dependant Surveillance-Broadcast (ADS-B) In-Trail Procedure (ITP). ITP is an Airborne Traffic Situation Awareness (ATSA) application designed for near-term use in procedural airspace in which ADS-B data are used to facilitate climb and descent maneuvers. NASA and Airservices conducted the experiment in Airservices simulator in Melbourne, Australia. Twelve current operational air traffic controllers participated in the experiment, which identified aspects of the ITP that could be improved (mainly in the communication and controller approval process). Results showed that controllers viewed the ITP as valid and acceptable. This paper describes the experiment design and results.
Time-Of-Flight Camera, Optical Tracker and Computed Tomography in Pairwise Data Registration.
Pycinski, Bartlomiej; Czajkowska, Joanna; Badura, Pawel; Juszczyk, Jan; Pietka, Ewa
2016-01-01
A growing number of medical applications, including minimal invasive surgery, depends on multi-modal or multi-sensors data processing. Fast and accurate 3D scene analysis, comprising data registration, seems to be crucial for the development of computer aided diagnosis and therapy. The advancement of surface tracking system based on optical trackers already plays an important role in surgical procedures planning. However, new modalities, like the time-of-flight (ToF) sensors, widely explored in non-medical fields are powerful and have the potential to become a part of computer aided surgery set-up. Connection of different acquisition systems promises to provide a valuable support for operating room procedures. Therefore, the detailed analysis of the accuracy of such multi-sensors positioning systems is needed. We present the system combining pre-operative CT series with intra-operative ToF-sensor and optical tracker point clouds. The methodology contains: optical sensor set-up and the ToF-camera calibration procedures, data pre-processing algorithms, and registration technique. The data pre-processing yields a surface, in case of CT, and point clouds for ToF-sensor and marker-driven optical tracker representation of an object of interest. An applied registration technique is based on Iterative Closest Point algorithm. The experiments validate the registration of each pair of modalities/sensors involving phantoms of four various human organs in terms of Hausdorff distance and mean absolute distance metrics. The best surface alignment was obtained for CT and optical tracker combination, whereas the worst for experiments involving ToF-camera. The obtained accuracies encourage to further develop the multi-sensors systems. The presented substantive discussion concerning the system limitations and possible improvements mainly related to the depth information produced by the ToF-sensor is useful for computer aided surgery developers.
The cognitive architecture for chaining of two mental operations.
Sackur, Jérôme; Dehaene, Stanislas
2009-05-01
A simple view, which dates back to Turing, proposes that complex cognitive operations are composed of serially arranged elementary operations, each passing intermediate results to the next. However, whether and how such serial processing is achieved with a brain composed of massively parallel processors, remains an open question. Here, we study the cognitive architecture for chained operations with an elementary arithmetic algorithm: we required participants to add (or subtract) two to a digit, and then compare the result with five. In four experiments, we probed the internal implementation of this task with chronometric analysis, the cued-response method, the priming method, and a subliminal forced-choice procedure. We found evidence for an approximately sequential processing, with an important qualification: the second operation in the algorithm appears to start before completion of the first operation. Furthermore, initially the second operation takes as input the stimulus number rather than the output of the first operation. Thus, operations that should be processed serially are in fact executed partially in parallel. Furthermore, although each elementary operation can proceed subliminally, their chaining does not occur in the absence of conscious perception. Overall, the results suggest that chaining is slow, effortful, imperfect (resulting partly in parallel rather than serial execution) and dependent on conscious control.
NASA Technical Reports Server (NTRS)
Stetson, Howard K.; Frank, Jeremy; Cornelius, Randy; Haddock, Angie; Wang, Lui; Garner, Larry
2015-01-01
NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). Utilization of Draper Laboratory's Timeliner software, deployed on-board the ISS within the Command and Control (C&C) computers and the Payload computers, allowed development of the automated procedures specific to ISS without having to certify and employ novel software for procedure development and execution. The procedures contained the ground procedure logic and actions as possible to include fault detection and recovery capabilities.
[Perioperative mortality. Risk factors associated with anaesthesia].
Zajac, Krzysztof; Zajac, Małgorzata
2005-01-01
Perioperative mortality associated with anaesthesia has been closely monitored throughout half of the century. The breakthrough in anaesthesia safety occurred in the 80-ties and 90-ties of the last century, when we could witness 5-folded reduction in mortality associated with anaesthesia, i.e. from 1 death:2680 operations/anaesthetic procedures (the 50-ties of the 20 h century) to 1:10,000 (and even 20-folded reduction within the ASA 1 and 2 groups of the patients--1 death:185,000 procedures). However, the more detailed analysis showed that the perioperative mortality is significantly higher, namely 1 death: approximately 500 procedures, and in the ASA 5 group of patients 1:4.5 procedures; what is more meaningful, the numbers have not been changed since 50 years. This phenomenon supports the thesis of anaesthesia safety, however, it indicates the drawbacks within the models and scoring systems evaluating operative risk. Several available scoring scales which can predict death rate, at the same time are not able to assess the extent of the other than biological risk factors. The "extra-biological risk" (i.e. process of therapy) may in some cases increase the operative risk as a whole. The value of the operative risk, as the fraction given by predicted death rate, is located between the numbers 0 and 1 (or between survival and death in the binary model of the probability theory). Recognition of the "extrabiological risk" value depends however on the high sensitivity of the scales evaluating prediction of death rate.
Philosophy, policies, and procedures - The three P's of flight-deck operations
NASA Technical Reports Server (NTRS)
Degani, Asaf; Wiener, Earl L.
1991-01-01
Standard operating procedures are drafted and provided to flightcrews to dictate the manner in which tasks are carried out. Failure to conform to Standard Operating Procedures (SOP) is frequently listed as the cause of violations, incidents, and accidents. However, procedures are often designed piecemeal, rather than being based on a sound philosophy of operations and policies that follow from such a philosophy. A framework of philosophy, policies, and procedures is proposed.
40 CFR 63.7323 - What procedures must I use to establish operating limits?
Code of Federal Regulations, 2011 CFR
2011-07-01
... operating limit according to the procedures in paragraphs (c)(1), (2), or (3) of this section. (1) If you... establish a site-specific operating limit for pressure drop according to the procedures in paragraphs (d)(1... § 63.7290(a). (3) Establish revised operating limits according to the applicable procedures in...
40 CFR 63.7323 - What procedures must I use to establish operating limits?
Code of Federal Regulations, 2010 CFR
2010-07-01
... operating limit according to the procedures in paragraphs (c)(1), (2), or (3) of this section. (1) If you... establish a site-specific operating limit for pressure drop according to the procedures in paragraphs (d)(1... § 63.7290(a). (3) Establish revised operating limits according to the applicable procedures in...
40 CFR 63.7323 - What procedures must I use to establish operating limits?
Code of Federal Regulations, 2012 CFR
2012-07-01
... to the procedures in paragraphs (c)(1), (2), or (3) of this section. (1) If you elect the operating...-specific operating limit for pressure drop according to the procedures in paragraphs (d)(1) and (2) of this... § 63.7290(a). (3) Establish revised operating limits according to the applicable procedures in...
40 CFR 63.7323 - What procedures must I use to establish operating limits?
Code of Federal Regulations, 2014 CFR
2014-07-01
... operating limit according to the procedures in paragraphs (c)(1), (2), or (3) of this section. (1) If you... establish a site-specific operating limit for pressure drop according to the procedures in paragraphs (d)(1... § 63.7290(a). (3) Establish revised operating limits according to the applicable procedures in...
40 CFR 63.7323 - What procedures must I use to establish operating limits?
Code of Federal Regulations, 2013 CFR
2013-07-01
... operating limit according to the procedures in paragraphs (c)(1), (2), or (3) of this section. (1) If you... establish a site-specific operating limit for pressure drop according to the procedures in paragraphs (d)(1... § 63.7290(a). (3) Establish revised operating limits according to the applicable procedures in...
40 CFR 792.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... standardized. (b) The written standard operating procedures required under § 792.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 792.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... standardized. (b) The written standard operating procedures required under § 792.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
21 CFR 58.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2013 CFR
2013-04-01
... standardized. (b) The written standard operating procedures required under § 58.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 792.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... standardized. (b) The written standard operating procedures required under § 792.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...