Sample records for process planning system

  1. A Search Algorithm for Generating Alternative Process Plans in Flexible Manufacturing System

    NASA Astrophysics Data System (ADS)

    Tehrani, Hossein; Sugimura, Nobuhiro; Tanimizu, Yoshitaka; Iwamura, Koji

    Capabilities and complexity of manufacturing systems are increasing and striving for an integrated manufacturing environment. Availability of alternative process plans is a key factor for integration of design, process planning and scheduling. This paper describes an algorithm for generation of alternative process plans by extending the existing framework of the process plan networks. A class diagram is introduced for generating process plans and process plan networks from the viewpoint of the integrated process planning and scheduling systems. An incomplete search algorithm is developed for generating and searching the process plan networks. The benefit of this algorithm is that the whole process plan network does not have to be generated before the search algorithm starts. This algorithm is applicable to large and enormous process plan networks and also to search wide areas of the network based on the user requirement. The algorithm can generate alternative process plans and to select a suitable one based on the objective functions.

  2. Iowa in motion : transit system plan : implementing Iowa's state transportation plan

    DOT National Transportation Integrated Search

    1999-09-14

    The Iowa Transit System Plan was developed as a result of the on-going long-range transportation planning process known as Iowa In Motion This planning document, the 1999 Iowa Transit System Plan, is the result of this continuing planning process and...

  3. Autonomous Agents for Dynamic Process Planning in the Flexible Manufacturing System

    NASA Astrophysics Data System (ADS)

    Nik Nejad, Hossein Tehrani; Sugimura, Nobuhiro; Iwamura, Koji; Tanimizu, Yoshitaka

    Rapid changes of market demands and pressures of competition require manufacturers to maintain highly flexible manufacturing systems to cope with a complex manufacturing environment. This paper deals with development of an agent-based architecture of dynamic systems for incremental process planning in the manufacturing systems. In consideration of alternative manufacturing processes and machine tools, the process plans and the schedules of the manufacturing resources are generated incrementally and dynamically. A negotiation protocol is discussed, in this paper, to generate suitable process plans for the target products real-timely and dynamically, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans are searched and generated to cope with both the dynamic changes of the product specifications and the disturbances of the manufacturing resources. We initiatively combine the heuristic search algorithms of the process plan networks with the negotiation protocols, in order to generate suitable process plans in the dynamic manufacturing environment.

  4. Integrated Dynamic Process Planning and Scheduling in Flexible Manufacturing Systems via Autonomous Agents

    NASA Astrophysics Data System (ADS)

    Nejad, Hossein Tehrani Nik; Sugimura, Nobuhiro; Iwamura, Koji; Tanimizu, Yoshitaka

    Process planning and scheduling are important manufacturing planning activities which deal with resource utilization and time span of manufacturing operations. The process plans and the schedules generated in the planning phase shall be modified in the execution phase due to the disturbances in the manufacturing systems. This paper deals with a multi-agent architecture of an integrated and dynamic system for process planning and scheduling for multi jobs. A negotiation protocol is discussed, in this paper, to generate the process plans and the schedules of the manufacturing resources and the individual jobs, dynamically and incrementally, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans and schedules are searched and generated to cope with both the dynamic status and the disturbances of the manufacturing systems. We initiatively combine the heuristic search algorithms of the process plan networks with the negotiation protocols, in order to generate suitable process plans and schedules in the dynamic manufacturing environment. A simulation software has been developed to carry out case studies, aimed at verifying the performance of the proposed multi-agent architecture.

  5. Implementation of a Web-Based Collaborative Process Planning System

    NASA Astrophysics Data System (ADS)

    Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi

    Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.

  6. Enterprise resource planning for hospitals.

    PubMed

    van Merode, Godefridus G; Groothuis, Siebren; Hasman, Arie

    2004-06-30

    Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the potential of enterprise resource planning (ERP) systems for healthcare delivery organizations. First ERP systems are explained. An overview is then presented of the characteristics of the planning process in hospital environments. Problems with ERP that are due to the special characteristics of healthcare are presented. The situations in which ERP can or cannot be used are discussed. It is suggested to divide hospitals in a part that is concerned only with deterministic processes and a part that is concerned with non-deterministic processes. ERP can be very useful for planning and controlling the deterministic processes.

  7. Automated process planning system

    NASA Technical Reports Server (NTRS)

    Mann, W.

    1978-01-01

    Program helps process engineers set up manufacturing plans for machined parts. System allows one to develop and store library of similar parts characteristics, as related to particular facility. Information is then used in interactive system to help develop manufacturing plans that meet required standards.

  8. An Evaluation on Medical Education, Research and Development of AYUSH Systems of Medicine through Five Year Plans of India.

    PubMed

    Samal, Janmejaya; Dehury, Ranjit Kumar

    2016-05-01

    Indian system of medicine has its origin in India. The system is currently renamed as AYUSH, an acronym for Ayurveda, Yoga & Naturopathy, Unani, Sidha and Homeopathy. These are the six Indian systems of medicine prevalent and practiced in India and in few neighboring Asian countries. The primary objective of this review was to gain insight in to the prior and existing initiatives which would enable reflection and assist in the identification of future change. A review was carried out based on the five year plan documents, obtained from the planning commission web portal of Govt. of India, on medical education, research and development of AYUSH systems of medicine. Post independence, the process of five year planning took its birth with the initiation of long term planning in India. The planning process embraced all the social and technology sectors in it. Since the beginning of five year planning, health and family welfare planning became imperative as a social sector planning. Planning regarding Indian Systems of Medicine became a part of health and family welfare planning since then. During the entire planning process a progressive path of development could be observed as per this evaluation. A relatively sluggish process of development was observed up to seventh plan however post eighth plan the growth took its pace. Eighth plan onwards several innovative development processes could be noticed. Despite the relative developments and growth of Indian systems of medicine these systems have to face lot of criticism and appraisal owing to their various characteristic features. In the beginning the system thrived with great degree of uncertainty, as described in 1(st) five year plan, however progressed ahead with a vision to be a globally accepted system, as envisaged in 11(th) five year plan. A very strong optimistic approach in spreading India's own medical heritage is the need of the hour. The efforts are neither completely insufficient nor sufficient enough; hence a continuous endeavor for the revival and dissemination of India's own medical inheritance for the welfare of the society at large is highly desirable.

  9. An Evaluation on Medical Education, Research and Development of AYUSH Systems of Medicine through Five Year Plans of India

    PubMed Central

    Dehury, Ranjit Kumar

    2016-01-01

    Introduction Indian system of medicine has its origin in India. The system is currently renamed as AYUSH, an acronym for Ayurveda, Yoga & Naturopathy, Unani, Sidha and Homeopathy. These are the six Indian systems of medicine prevalent and practiced in India and in few neighboring Asian countries. Objective The primary objective of this review was to gain insight in to the prior and existing initiatives which would enable reflection and assist in the identification of future change. Materials and Methods A review was carried out based on the five year plan documents, obtained from the planning commission web portal of Govt. of India, on medical education, research and development of AYUSH systems of medicine. Results Post independence, the process of five year planning took its birth with the initiation of long term planning in India. The planning process embraced all the social and technology sectors in it. Since the beginning of five year planning, health and family welfare planning became imperative as a social sector planning. Planning regarding Indian Systems of Medicine became a part of health and family welfare planning since then. During the entire planning process a progressive path of development could be observed as per this evaluation. A relatively sluggish process of development was observed up to seventh plan however post eighth plan the growth took its pace. Eighth plan onwards several innovative development processes could be noticed. Despite the relative developments and growth of Indian systems of medicine these systems have to face lot of criticism and appraisal owing to their various characteristic features. In the beginning the system thrived with great degree of uncertainty, as described in 1st five year plan, however progressed ahead with a vision to be a globally accepted system, as envisaged in 11th five year plan. Conclusion A very strong optimistic approach in spreading India’s own medical heritage is the need of the hour. The efforts are neither completely insufficient nor sufficient enough; hence a continuous endeavor for the revival and dissemination of India’s own medical inheritance for the welfare of the society at large is highly desirable. PMID:27437245

  10. Challenges for Planning and Maintaining of Urban Rain Harvesting Systems- the case of Hammarby Sjöstad and Årstafältet in Stockholm

    NASA Astrophysics Data System (ADS)

    Suleiman, Lina

    2017-04-01

    Planners and policymakers' concern escalates over conventional systems dealing with rains in cities based on domination and control of nature rather than harmony and design with nature. A new spatial planning paradigm is needed to put in place systems which mimic natural water systems and promise multiple values instead of systems consider rain as a source of problem. However, such approach embodies significant planning challenges. Urban rain harvesting systems (URHs) are inherently viewed as 'sociotechnical' systems. As such, planning processes should consider the interdependence of 'social' and 'technical' aspects as essential elements if a transition towards sustainable urban water systems is to be realised. Drawing on a common understanding for what urban rain harvesting systems should deliver in terms of 'functions' and 'added values', a generic planning framework is developed to inform practitioners on how the 'socio' and 'technical' elements should be assimilated in a long-term and integrated planning processes of URHs. Using the developed framework, the paper examines the planning and maintenance processes of urban rain harvesting systems in Årstafältet and Hammarby Sjöstad respectively. Results show that planners lack a common operational understanding on how these systems should be designed holistically in a long term and integrated planning processes creating working gabs or positional conflicts. In practice, urban planners and water engineers look at these systems as either urban design component or water drainage system to deal with technical functions hindering a smooth transition path towards urban rain harvesting systems. The paper concludes on the urgency for reordering roles and relations within a new set-up organisation to incubate these systems in long-term planning and maintenance processes. Key words: 'Sociotechnical' system, Water, Planning, Urban Rain Harvesting systems (URHs), Hammarby Sjostad and Årstafältet

  11. Intensity modulated neutron radiotherapy optimization by photon proxy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Snyder, Michael; Hammoud, Ahmad; Bossenberger, Todd

    2012-08-15

    Purpose: Introducing intensity modulation into neutron radiotherapy (IMNRT) planning has the potential to mitigate some normal tissue complications seen in past neutron trials. While the hardware to deliver IMNRT plans has been in use for several years, until recently the IMNRT planning process has been cumbersome and of lower fidelity than conventional photon plans. Our in-house planning system used to calculate neutron therapy plans allows beam weight optimization of forward planned segments, but does not provide inverse optimization capabilities. Commercial treatment planning systems provide inverse optimization capabilities, but currently cannot model our neutron beam. Methods: We have developed a methodologymore » and software suite to make use of the robust optimization in our commercial planning system while still using our in-house planning system to calculate final neutron dose distributions. Optimized multileaf collimator (MLC) leaf positions for segments designed in the commercial system using a 4 MV photon proxy beam are translated into static neutron ports that can be represented within our in-house treatment planning system. The true neutron dose distribution is calculated in the in-house system and then exported back through the MATLAB software into the commercial treatment planning system for evaluation. Results: The planning process produces optimized IMNRT plans that reduce dose to normal tissue structures as compared to 3D conformal plans using static MLC apertures. The process involves standard planning techniques using a commercially available treatment planning system, and is not significantly more complex than conventional IMRT planning. Using a photon proxy in a commercial optimization algorithm produces IMNRT plans that are more conformal than those previously designed at our center and take much less time to create. Conclusions: The planning process presented here allows for the optimization of IMNRT plans by a commercial treatment planning optimization algorithm, potentially allowing IMNRT to achieve similar conformality in treatment as photon IMRT. The only remaining requirements for the delivery of very highly modulated neutron treatments are incremental improvements upon already implemented hardware systems that should be readily achievable.« less

  12. 49 CFR 659.23 - System security plan: contents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false System security plan: contents. 659.23 Section 659... State Oversight Agency § 659.23 System security plan: contents. The system security plan must, at a... system security plan; and (e) Document the rail transit agency's process for making its system security...

  13. Information technology strategic planning: art or science?

    PubMed

    Hutsell, Richard; Mancini-Newell, Lulcy

    2005-01-01

    It had been almost a decade since the hospitals that make up the Daughters of Charity Health System (DCHS) had engaged in a formal information technology strategic planning process. In the summer of 2002, as the health system re-formed, there was a unique opportunity to introduce a planning process that reflected the governance style of the new health system. DCHS embarked on this journey, with the CIO initiating and formally sponsoring the information technology strategic planning process in a dynamic and collaborative manner The system sought to develop a plan tailored to encompass both enterprise-wide and local requirements; to develop a governance model to engage the members of the local health ministries in plan development, both now and in the future; and to conduct the process in a manner that reflected the values of the Daughters of Charity. The DCHS CIO outlined a premise that the CIO would guide and be continuously involved in the development of this tailored process, in conjunction with an external resource. Together, there would be joint responsibility for introducing a flexible information technology strategic planning methodology; providing an education on the current state of healthcare IT, including future trends and success factors; facilitating support to tap into existing internal talent; cultivating a collaborative process to support both current requirements and future vision; and developing a well-functioning governance structure that would enable the plan to evolve and reflect user community requirements. This article highlights the planning process, including the lessons learned, the benchmarking during and in post-planning, and finally, but most importantly, the unexpected benefit that resulted from this planning process.

  14. The California general plan process and sustainable transportation planning

    DOT National Transportation Integrated Search

    2002-05-01

    This research project assesses California's General Plan process as a tool for implementing sustainable development, with particular emphasis on transportation systems at the local level, including the relationship of local transportation systems to ...

  15. Efficiency improvement of technological preparation of power equipment manufacturing

    NASA Astrophysics Data System (ADS)

    Milukov, I. A.; Rogalev, A. N.; Sokolov, V. P.; Shevchenko, I. V.

    2017-11-01

    Competitiveness of power equipment primarily depends on speeding-up the development and mastering of new equipment samples and technologies, enhancement of organisation and management of design, manufacturing and operation. Actual political, technological and economic conditions cause the acute need in changing the strategy and tactics of process planning. At that the issues of maintenance of equipment with simultaneous improvement of its efficiency and compatibility to domestically produced components are considering. In order to solve these problems, using the systems of computer-aided process planning for process design at all stages of power equipment life cycle is economically viable. Computer-aided process planning is developed for the purpose of improvement of process planning by using mathematical methods and optimisation of design and management processes on the basis of CALS technologies, which allows for simultaneous process design, process planning organisation and management based on mathematical and physical modelling of interrelated design objects and production system. An integration of computer-aided systems providing the interaction of informative and material processes at all stages of product life cycle is proposed as effective solution to the challenges in new equipment design and process planning.

  16. MO-B-BRB-03: Systems Engineering Tools for Treatment Planning Process Optimization in Radiation Medicine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kapur, A.

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less

  17. Planning Systems for Distributed Operations

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  18. Not planning a sustainable transport system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finnveden, Göran, E-mail: goran.finnveden@abe.kth.se; Åkerman, Jonas

    2014-04-01

    The overall objective of the Swedish transport policy is to ensure the economically efficient and sustainable provision of transport services for people and business throughout the country. More specifically, the transport sector shall, among other things, contribute to the achievement of environmental quality objectives in which the development of the transport system plays an important role in the achievement of the objectives. The aim of this study is to analyse if current transport planning supports this policy. This is done by analysing two recent cases: the National Infrastructure Plan 2010–2021, and the planning of Bypass Stockholm, a major road investment.more » Our results show that the plans are in conflict with several of the environmental quality objectives. Another interesting aspect of the planning processes is that the long-term climate goals are not included in the planning processes, neither as a clear goal nor as factor that will influence future transport systems. In this way, the long-term sustainability aspects are not present in the planning. We conclude that the two cases do not contribute to a sustainable transport system. Thus, several changes must be made in the processes, including putting up clear targets for emissions. Also, the methodology for the environmental assessments needs to be further developed and discussed. - Highlights: • Two cases are studied to analyse if current planning supports a sustainable transport system. • Results show that the plans are in conflict with several of the environmental quality objectives. • Long-term climate goals are not included in the planning processes. • Current practices do not contribute to a sustainable planning processes. • Methodology and process for environmental assessments must be further developed and discussed.« less

  19. A Comprehensive Planning Model.

    ERIC Educational Resources Information Center

    Rieley, James B.

    The key to long-term institutional effectiveness is a comprehensive planning process that identifies a few vital goals that can be measured by an institution. Effective strategic planning involves five key elements: process-based planning, a systemic approach, integration with the budget process, an effective deployment process, and appropriate…

  20. Knowledge Acquisition, Validation, and Maintenance in a Planning System for Automated Image Processing

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.

    1996-01-01

    A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintainting the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems. This paper describes a planning application of automated imaging processing and our overall approach to knowledge acquisition for this application.

  1. On Intelligent Design and Planning Method of Process Route Based on Gun Breech Machining Process

    NASA Astrophysics Data System (ADS)

    Hongzhi, Zhao; Jian, Zhang

    2018-03-01

    The paper states an approach of intelligent design and planning of process route based on gun breech machining process, against several problems, such as complex machining process of gun breech, tedious route design and long period of its traditional unmanageable process route. Based on gun breech machining process, intelligent design and planning system of process route are developed by virtue of DEST and VC++. The system includes two functional modules--process route intelligent design and its planning. The process route intelligent design module, through the analysis of gun breech machining process, summarizes breech process knowledge so as to complete the design of knowledge base and inference engine. And then gun breech process route intelligently output. On the basis of intelligent route design module, the final process route is made, edited and managed in the process route planning module.

  2. Basic Concepts Required in the Development of a Planning Information System.

    ERIC Educational Resources Information Center

    Kennedy, F. D.

    This report, the result of developmental research on a planning information system for North Carolina, describes the planning process at higher levels of State government, defines a general information system and derives a planning information system from various types of planning, provides guidelines for system design and evaluation, and…

  3. A planning language for activity scheduling

    NASA Technical Reports Server (NTRS)

    Zoch, David R.; Lavallee, David; Weinstein, Stuart; Tong, G. Michael

    1991-01-01

    Mission planning and scheduling of spacecraft operations are becoming more complex at NASA. Described here are a mission planning process; a robust, flexible planning language for spacecraft and payload operations; and a software scheduling system that generates schedules based on planning language inputs. The mission planning process often involves many people and organizations. Consequently, a planning language is needed to facilitate communication, to provide a standard interface, and to represent flexible requirements. The software scheduling system interprets the planning language and uses the resource, time duration, constraint, and alternative plan flexibilities to resolve scheduling conflicts.

  4. Advancing mission in the marketplace. Integrated strategic planning and budgeting helps a system remain accountable.

    PubMed

    Smessaert, A H

    1992-10-01

    In the late 1980s Holy Cross Health System (HCHS), South Bend, IN, began to implement a revised strategic planning and budgeting process to effectively link the system's mission with its day-to-day operations. Leaders wanted a process that would help system employees internalize and act on the four major elements articulated in the HCHS mission statement: fidelity, excellence, empowerment, and stewardship. Representatives from mission, strategic planning, and finance from the corporate office and subsidiaries examined planning and budgeting methods. From the beginning, HCHS leaders decided that the process should be implemented gradually, with each step focusing on refining methodology and improving mission integration. As the process evolved. HCHS developed a sequence in which planning preceded budgeting. The system also developed a variety of educational and collaborative initiatives to help system employees adapt to the organization's change of direction. One critical aspect of HCHS's ongoing education is an ethical reflection process that helps participants balance ethical considerations by viewing an issue from three perspectives: social vision, multiple responsibility, and self-interest.

  5. PMIS Project. Planning & Management Information System. A Project To Develop a Data Processing System for Support of the Planning and Management Needs of Local School Districts. Final Report, Year 2.

    ERIC Educational Resources Information Center

    Council of the Great City Schools, Washington, DC.

    This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…

  6. 42 CFR 433.138 - Identifying liable third parties.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval system approved by CMS under subpart C of... plan must be integrated with the mechanized claims processing and information retrieval system. (2) The...

  7. 42 CFR 433.138 - Identifying liable third parties.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval system approved by CMS under subpart C of... plan must be integrated with the mechanized claims processing and information retrieval system. (2) The...

  8. 42 CFR 433.138 - Identifying liable third parties.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval system approved by CMS under subpart C of... plan must be integrated with the mechanized claims processing and information retrieval system. (2) The...

  9. Renewable Energy Zone (REZ) Transmission Planning Process: A Guidebook for Practitioners

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Nathan; Flores-Espino, Francisco; Hurlbut, David J.

    Achieving clean energy goals may require new investments in transmission, especially if planners anticipate economic growth and increased demand for electricity. The renewable energy zone (REZ) transmission planning process can help policymakers ensure their infrastructure investments achieve national goals in the most economical manner. Policymakers, planners, and system operators around the world have used variations of the REZ process to chart the expansion of their transmission networks and overcome the barriers of traditional transmission planning. This guidebook seeks to help power system planners, key decision makers, and stakeholders understand and use the REZ transmission planning process to integrate transmission expansionmore » planning and renewable energy generation planning.« less

  10. Automating Space Station operations planning

    NASA Technical Reports Server (NTRS)

    Ziemer, Kathleen A.

    1989-01-01

    The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.

  11. PLANiTS : structuring and supporting the intelligent transportation systems planning process

    DOT National Transportation Integrated Search

    1997-01-01

    PLANiTS (Planning and Analysis Integration for Intelligent Transportation Systems) is a process-based computer system that supports a series of mutually interdependent steps progressing toward developing and programming transportation improvement pro...

  12. The use of discrete-event simulation modelling to improve radiation therapy planning processes.

    PubMed

    Werker, Greg; Sauré, Antoine; French, John; Shechter, Steven

    2009-07-01

    The planning portion of the radiation therapy treatment process at the British Columbia Cancer Agency is efficient but nevertheless contains room for improvement. The purpose of this study is to show how a discrete-event simulation (DES) model can be used to represent this complex process and to suggest improvements that may reduce the planning time and ultimately reduce overall waiting times. A simulation model of the radiation therapy (RT) planning process was constructed using the Arena simulation software, representing the complexities of the system. Several types of inputs feed into the model; these inputs come from historical data, a staff survey, and interviews with planners. The simulation model was validated against historical data and then used to test various scenarios to identify and quantify potential improvements to the RT planning process. Simulation modelling is an attractive tool for describing complex systems, and can be used to identify improvements to the processes involved. It is possible to use this technique in the area of radiation therapy planning with the intent of reducing process times and subsequent delays for patient treatment. In this particular system, reducing the variability and length of oncologist-related delays contributes most to improving the planning time.

  13. A negotiation methodology and its application to cogeneration planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, S.M.; Liu, C.C.; Luu, S.

    Power system planning has become a complex process in utilities today. This paper presents a methodology for integrated planning with multiple objectives. The methodology uses a graphical representation (Goal-Decision Network) to capture the planning knowledge. The planning process is viewed as a negotiation process that applies three negotiation operators to search for beneficial decisions in a GDN. Also, the negotiation framework is applied to the problem of planning for cogeneration interconnection. The simulation results are presented to illustrate the cogeneration planning process.

  14. Application of genetic algorithm in integrated setup planning and operation sequencing

    NASA Astrophysics Data System (ADS)

    Kafashi, Sajad; Shakeri, Mohsen

    2011-01-01

    Process planning is an essential component for linking design and manufacturing process. Setup planning and operation sequencing is two main tasks in process planning. Many researches solved these two problems separately. Considering the fact that the two functions are complementary, it is necessary to integrate them more tightly so that performance of a manufacturing system can be improved economically and competitively. This paper present a generative system and genetic algorithm (GA) approach to process plan the given part. The proposed approach and optimization methodology analyses the TAD (tool approach direction), tolerance relation between features and feature precedence relations to generate all possible setups and operations using workshop resource database. Based on these technological constraints the GA algorithm approach, which adopts the feature-based representation, optimizes the setup plan and sequence of operations using cost indices. Case study show that the developed system can generate satisfactory results in optimizing the setup planning and operation sequencing simultaneously in feasible condition.

  15. Institutional Planning as a Participative Process: A Community College Self Study.

    ERIC Educational Resources Information Center

    Sturtz, Alan J.

    In 1981, South Central Community College received funding to develop a long-range planning process. The process was to be modeled on the 3-year planning cycle developed by the National Center for Higher Education Management Systems and to use the college's existing organizational structure. Since November 1981, the planning process at the college…

  16. Apply creative thinking of decision support in electrical nursing record.

    PubMed

    Hao, Angelica Te-Hui; Hsu, Chien-Yeh; Li-Fang, Huang; Jian, Wen-Shan; Wu, Li-Bin; Kao, Ching-Chiu; Lu, Mei-Show; Chang, Her-Kung

    2006-01-01

    The nursing process consists of five interrelated steps: assessment, diagnosis, planning, intervention, and evaluation. In the nursing process, the nurse collects a great deal of data and information. The amount of data and information may exceed the amount the nurse can process efficiently and correctly. Thus, the nurse needs assistance to become proficient in the planning of nursing care, due to the difficulty of simultaneously processing a large set of information. Computer systems are viewed as tools to expand the capabilities of the nurse's mind. Using computer technology to support clinicians' decision making may provide high-quality, patient-centered, and efficient healthcare. Although some existing nursing information systems aid in the nursing process, they only provide the most fundamental decision support--i.e., standard care plans associated with common nursing diagnoses. Such a computerized decision support system helps the nurse develop a care plan step-by-step. But it does not assist the nurse in the decision-making process. The decision process about how to generate nursing diagnoses from data and how to individualize the care plans still reminds of the nurse. The purpose of this study is to develop a pilot structure in electronic nursing record system integrated with international nursing standard for improving the proficiency and accuracy of plan of care in clinical pathway process. The proposed pilot systems not only assist both student nurses and nurses who are novice in nursing practice, but also experts who need to work in a practice area which they are not familiar with.

  17. Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.; McNair, Ann R. (Technical Monitor)

    2002-01-01

    The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

  18. Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.

    2002-01-01

    The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

  19. Navy Did Not Develop Processes in the Navy Enterprise Resource Planning System to Account for Military Equipment Assets

    DTIC Science & Technology

    2013-07-18

    Department of the Navy ERP Enterprise Resource Planning FMO Office of Financial Operations NAVAIR Naval Air Systems Command NAVSEA Naval...supported by business processes in the Navy Enterprise Resource Planning ( ERP ) system for the Aircraft, Shipbuilding, and Weapons Procurement...appropriations. What We Found Department of the Navy Office of Financial Operations officials did not use the Navy ERP system to support $416 billion in

  20. Automating Acquisitions: The Planning Process.

    ERIC Educational Resources Information Center

    Bryant, Bonita

    1984-01-01

    Account of process followed at large academic library in preparing for automation of acquisition and fund accounting functions highlights planning criteria, local goals, planning process elements (selecting participants, assigning tasks, devising timetable, providing foundations, evaluating systems, determining costs, formulating recommendations).…

  1. Congestion Management System Process Report

    DOT National Transportation Integrated Search

    1996-03-01

    In January 1995, the Indianapolis Metropolitan Planning Organization with the help of an interagency Study Review Committee began the process of developing a Congestion Management System (CMS) Plan resulting in this report. This report documents the ...

  2. Computer Aided Process Planning (CAPP): The User Interface for the Fabrication Module of the Rapid Design System

    DTIC Science & Technology

    1991-01-01

    plan. The Fabrication Planning Module automatically creates a plan using information from the Feature Based Design Environment (FBDE) of the RDS. It...llll By using the user Interface, the final process plan can be modified in many different ways. The translation of a design feature to a more...for the review and modification of a process plan. The Fabrication Planning Module automatically creates a plan using information from the Feature Based

  3. 42 CFR 433.138 - Identifying liable third parties.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Integration with the State mechanized claims processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval... processing and information retrieval system. (2) The action plan must describe the actions and methodologies...

  4. 42 CFR 433.138 - Identifying liable third parties.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Integration with the State mechanized claims processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval... processing and information retrieval system. (2) The action plan must describe the actions and methodologies...

  5. The role of CQI in the strategic planning process.

    PubMed

    Sahney, V K; Warden, G L

    1993-01-01

    This article describes the strategic planning process used to define the health care needs of a region and to prepare Henry Ford Health System (HFHS) to meet the needs of the 21st century. It presents key applications of continuous quality improvement in the development and implementation of the strategic plans for HFHS; explains how HFHS adapted the Deming/Shewhart cycle of continuous improvement for the purpose of improving its planning process; and delineates how the strategic planning, financial planning, and quality planning processes have been integrated.

  6. MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feng, W.

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less

  7. MO-B-BRB-00: Optimizing the Treatment Planning Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less

  8. 48 CFR 1407.102 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANNING ACQUISITION PLANNING Acquisition Plans 1407.102 Policy. DOI has implemented its acquisition planning system in 404 DM. This system meets the criteria prescribed in FAR Subpart 7.1, 375 DM, OCIO Program Management, and 376 DM, Automated Data Processing. Each of these addresses strategic planning for...

  9. 48 CFR 1407.102 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PLANNING ACQUISITION PLANNING Acquisition Plans 1407.102 Policy. DOI has implemented its acquisition planning system in 404 DM. This system meets the criteria prescribed in FAR Subpart 7.1, 375 DM, OCIO Program Management, and 376 DM, Automated Data Processing. Each of these addresses strategic planning for...

  10. Strategies for automatic planning: A collection of ideas

    NASA Technical Reports Server (NTRS)

    Collins, Carol; George, Julia; Zamani, Elaine

    1989-01-01

    The main goal of the Jet Propulsion Laboratory (JPL) is to obtain science return from interplanetary probes. The uplink process is concerned with communicating commands to a spacecraft in order to achieve science objectives. There are two main parts to the development of the command file which is sent to a spacecraft. First, the activity planning process integrates the science requests for utilization of spacecraft time into a feasible sequence. Then the command generation process converts the sequence into a set of commands. The development of a feasible sequence plan is an expensive and labor intensive process requiring many months of effort. In order to save time and manpower in the uplink process, automation of parts of this process is desired. There is an ongoing effort to develop automatic planning systems. This has met with some success, but has also been informative about the nature of this effort. It is now clear that innovative techniques and state-of-the-art technology will be required in order to produce a system which can provide automatic sequence planning. As part of this effort to develop automatic planning systems, a survey of the literature, looking for known techniques which may be applicable to our work was conducted. Descriptions of and references for these methods are given, together with ideas for applying the techniques to automatic planning.

  11. 75 FR 66319 - State Systems Advance Planning Document (APD) Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ...) equipment and services. The APD process was designed to mitigate financial risks, avoid incompatibilities... develop a General Systems Design (GSD). Implementation APD means a recorded plan of action to request Federal financial participation (FFP) in the costs of designing, developing and implementing the system...

  12. A Five-Year Plan for Meeting the Automatic Data Processing and Telecommunications Needs of the Federal Government. Volume 2: Major Information Technology Systems Acquisition Plans of Federal Executive Agencies, 1984-1989.

    ERIC Educational Resources Information Center

    Department of Commerce, Washington, DC.

    This volume, the second of two, presents and analyzes the information technology acquisition plans of the Federal Government by agency and component. A brief description covers the outlays planned for major information technology acquisitions of general purpose data processing and telecommunications systems, facilities, and related services for 6…

  13. Improving TOGAF ADM 9.1 Migration Planning Phase by ITIL V3 Service Transition

    NASA Astrophysics Data System (ADS)

    Hanum Harani, Nisa; Akhmad Arman, Arry; Maulana Awangga, Rolly

    2018-04-01

    Modification planning of business transformation involving technological utilization required a system of transition and migration planning process. Planning of system migration activity is the most important. The migration process is including complex elements such as business re-engineering, transition scheme mapping, data transformation, application development, individual involvement by computer and trial interaction. TOGAF ADM is the framework and method of enterprise architecture implementation. TOGAF ADM provides a manual refer to the architecture and migration planning. The planning includes an implementation solution, in this case, IT solution, but when the solution becomes an IT operational planning, TOGAF could not handle it. This paper presents a new model framework detail transitions process of integration between TOGAF and ITIL. We evaluated our models in field study inside a private university.

  14. Developing an information systems strategy for nursing.

    PubMed

    Callanan, K M; Hughes, S J

    1995-01-01

    With the rapidly changing health care environment and information technology advances, organizations need to engage in strategic, planned change in order to allocate limited resources, achieve the organization's goals, and fulfill its mission [1]. One of the most important aspects of the organization's planned strategies for change concerns the information systems. The involvement of the nursing department in this process is critical. This poster presentation will communicate how nurses can develop an information systems strategic plan that will enable them to play an active role as contributors and vital participants in the strategic and business planning processes for information systems. This information systems strategy for nursing will: a) provide direction and purpose, b) guide nursing in identifying the kinds of information technology needed, c) assist in timely implementation of a system that supports nursing, and d) identify desired outcomes and benefits of an information system. The nursing information systems plan must be built on, and support, the organization's mission and business plan and integrate into the over-all information systems plans [2]. Components of the nursing strategic plan include the nursing mission statement and vision, an assessment of the current environment to identify supporting technology needed to achieve the nursing vision, expectations/anticipated outcomes, environmental considerations, and special staffing/expertise considerations. The nursing vision and mission statement is an articulation of the overall direction and purpose of the nursing organization. An assessment of the nursing organization, problem areas, opportunities for growth, the physical environment, existing systems, communications requirements, and resources is carried out to help identify areas where new technologies and automated methods of managing information could be applied. Special staffing and expertise not currently available in the organization, but necessary to the successful implementation of the plan, should be identified, and plans for filling those needs should be included in the planning and prioritization process. Based on the mission and assessment findings, goals or anticipated outcomes are developed. These goals must be realistic, financially feasible, and logistically achievable; they should also provide direction for action and decision-making [3]. Measurable objectives and detailed action plans can then be developed from these goals when implementation of this aspect of the strategic plan is begun. It is especially important, even at a strategic planning level, to consider change management techniques, including specific steps to involve individuals who will be affected by the change and to ensure open communication throughout the process. Efforts to collaborate with all affected departments and to offer input and educational opportunities to the various members of the health care team should be included in the strategic plan. A business plan describing the mission, goals, and objectives for a specific system implementation is the final step in the strategic planning process. The business plan includes expected outcomes and cost justification and may be done in cooperation with other departments (in the organization) that will be involved with this system. The business plan is used to communicate the information system's needs to the administration and governing board of the organization. With a good information systems strategy, nursing will be prepared to make more timely and better informed decisions related to applying information technology within the nursing department. The end results of this planning should be evident in the improved utilization of information technology to support the nursing vision and mission.

  15. MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chang, J.

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less

  16. Identifying Executable Plans

    NASA Technical Reports Server (NTRS)

    Bedrax-Weiss, Tania; Jonsson, Ari K.; Frank, Jeremy D.; McGann, Conor

    2003-01-01

    Generating plans for execution imposes a different set of requirements on the planning process than those imposed by planning alone. In highly unpredictable execution environments, a fully-grounded plan may become inconsistent frequently when the world fails to behave as expected. Intelligent execution permits making decisions when the most up-to-date information is available, ensuring fewer failures. Planning should acknowledge the capabilities of the execution system, both to ensure robust execution in the face of uncertainty, which also relieves the planner of the burden of making premature commitments. We present Plan Identification Functions (PIFs), which formalize what it means for a plan to be executable, md are used in conjunction with a complete model of system behavior to halt the planning process when an executable plan is found. We describe the implementation of plan identification functions for a temporal, constraint-based planner. This particular implementation allows the description of many different plan identification functions. characteristics crf the xectieonfvii rnm-enft,h e best plan to hand to the execution system will contain more or less commitment and information.

  17. Using TELOS for the planning of the information system audit

    NASA Astrophysics Data System (ADS)

    Drljaca, D. P.; Latinovic, B.

    2018-01-01

    This paper intent is to analyse different aspects of information system audit and to synthesise them into the feasibility study report in order to facilitate decision making and planning of information system audit process. The TELOS methodology provides a comprehensive and holistic review for making feasibility study in general. This paper examines the use of TELOS in the identification of possible factors that may influence the decision on implementing information system audit. The research question relates to TELOS provision of sufficient information to decision makers to plan an information system audit. It was found that the TELOS methodology can be successfully applied in the process of approving and planning of information system audit. The five aspects of the feasibility study, if performed objectively, can provide sufficient information to decision makers to commission an information system audit, and also contribute better planning of the audit. Using TELOS methodology can assure evidence-based and cost-effective decision-making process and facilitate planning of the audit. The paper proposes an original approach, not examined until now. It is usual to use TELOS for different purposes and when there is a need for conveying of the feasibility study, but not in the planning of the information system audit. This gives originality to the paper and opens further research questions about evaluation of the feasibility study and possible research on comparative and complementary methodologies.

  18. Multimodal system planning technique : an analytical approach to peak period operation

    DOT National Transportation Integrated Search

    1995-11-01

    The multimodal system planning technique described in this report is an improvement of the methodology used in the Dallas System Planning Study. The technique includes a spreadsheet-based process to identify the costs of congestion, construction, and...

  19. Instructional Systems Design and Preservice Teachers' Processes of Thinking, Teaching and Planning: What Do They Learn and How Do They Change?

    ERIC Educational Resources Information Center

    Moallem, Mahnaz; Applefield, James

    This study explored the development and processes of thinking, planning, and decision making of two preservice teachers as they progressed through their teacher education program. The effects of training in the systems approach on two preservice teachers' thinking about instruction and on their actual instructional planning documents were…

  20. Operative planning of functional sessions for multisatellite observation and communication systems

    NASA Astrophysics Data System (ADS)

    Darnopykh, Valeriy V.; Malyshev, Veniamin V.

    2012-04-01

    An important control aspect of modern satellite observation and communication systems is the control of the functional processes. Functional sessions proceed under conditions of restricted technical ability, large amounts or information to be processed by the on-board equipment, practice inequality of the received information, intentions of system management and operators, interests of customers and other factors. A large number of spacecrafts (SC) in orbital constellation is one of the most important factors affecting the functional process also. Besides that some modern projects of satellite systems are multifunctional that is mixed operations of observation and communication. Therefore the functioning of SC on-board equipment must be accurately co-ordinate. That is why the problem of operative planning the functioning of these systems, while directly affecting the efficiency of the system, is very complex and actual at present. A methodical approach and software package for operative planning of functional processes for satellite observation and communication systems, including multifunctional projects, are considered in the paper. The base scheme of this approach consists of four main stages: stage 1—modeling of SC orbital kinematics and dynamics; stage 2—modeling of system functional processes with all kind of restrictions and criterion function values; stage 3—solving an optimization tasks by numerical applicable algorithms and constructing the optimal (or accuracy) plans; stage 4—repeated plan optimization (different variants) and analyzing. Such scheme is the result of authors practical research which have been realized during last 15 years by the operative planning as for any kinds of single SC as for satellite systems with different structure of orbital constellation. The research helps to unify the procedure of operative planning, to formulate basic principles and approaches for its solving, to develop special software package. The main aspects of the approach proposed are illustrated in the paper. The results of the calculations of applied planning problems are presented. The objects of research in these problems are: projects of CBERS observation systems (1-3 SC) and projects of Iridium (66 SC) global communication system.

  1. Linking human and natural systems in the planning process

    Treesearch

    Susan I. Stewart; Miranda H. Mockrin; Roger B. Hammer

    2012-01-01

    Planning links human and natural systems in the urban-rural interface by engaging people in consideration of the future of natural resources. We review evolving ideas about what planning entails, who it involves, and what its outcomes should be. Sense of place, collaboration, emergent planning, and other new developments in planning are discussed. Smaller plans,...

  2. Rolling capital: managing investments in a value-based care world.

    PubMed

    Jasuta, Lynette

    2016-06-01

    The importance of capital planning is increasing as the healthcare industry moves toward value-based care. Replacing unwieldy and inflexible traditional capital planning processes with a rolling capital planning approach can result in: Greater standardization, facilitating better strategic planning across the whole system. Reduced labor intensity in the planning and budgeting process. Reduced costs through being able to plan better for replacement purchases and take advantage of group purchasing and bundling opportunities. Increased transparency in the decision-making process.

  3. The role of strategic health planning processes in the development of health care reform policies: a comparative study of Eritrea, Mozambique and Zimbabwe.

    PubMed

    Green, Andrew; Collins, Charles; Stefanini, Angelo; Ferrinho, Paulo; Chapman, Glyn; Hagos, Besrat; Adams, Yussuf; Omar, Mayeh

    2007-01-01

    This paper reports on comparative analysis of health planning and its relationship with health care reform in three countries, Eritrea, Mozambique and Zimbabwe. The research examined strategic planning in each country focusing in particular on its role in developing health sector reforms. The paper analyses the processes for strategic planning, the values that underpin the planning systems, and issues related to resources for planning processes. The resultant content of strategic plans is assessed and not seen to have driven the development of reforms; whilst each country had adopted strategic planning systems, in all three countries a more complex interplay of forces, including influences outside both the health sector and the country, had been critical forces behind the sectoral changes experienced over the previous decade. The key roles of different actors in developing the plans and reforms are also assessed. The paper concludes that a number of different conceptions of strategic planning exist and will depend on the particular context within which the health system is placed. Whilst similarities were discovered between strategic planning systems in the three countries, there are also key differences in terms of formality, timeframes, structures and degrees of inclusiveness. No clear leadership role for strategic planning in terms of health sector reforms was discovered. Planning appears in the three countries to be more operational than strategic. Copyright (c) 2006 John Wiley & Sons, Ltd.

  4. Modeling and analysis of power processing systems: Feasibility investigation and formulation of a methodology

    NASA Technical Reports Server (NTRS)

    Biess, J. J.; Yu, Y.; Middlebrook, R. D.; Schoenfeld, A. D.

    1974-01-01

    A review is given of future power processing systems planned for the next 20 years, and the state-of-the-art of power processing design modeling and analysis techniques used to optimize power processing systems. A methodology of modeling and analysis of power processing equipment and systems has been formulated to fulfill future tradeoff studies and optimization requirements. Computer techniques were applied to simulate power processor performance and to optimize the design of power processing equipment. A program plan to systematically develop and apply the tools for power processing systems modeling and analysis is presented so that meaningful results can be obtained each year to aid the power processing system engineer and power processing equipment circuit designers in their conceptual and detail design and analysis tasks.

  5. Reengineering the picture archiving and communication system (PACS) process for digital imaging networks PACS.

    PubMed

    Horton, M C; Lewis, T E; Kinsey, T V

    1999-05-01

    Prior to June 1997, military picture archiving and communications systems (PACS) were planned, procured, and installed with key decisions on the system, equipment, and even funding sources made through a research and development office called Medical Diagnostic Imaging Systems (MDIS). Beginning in June 1997, the Joint Imaging Technology Project Office (JITPO) initiated a collaborative and consultative process for planning and implementing PACS into military treatment facilities through a new Department of Defense (DoD) contract vehicle called digital imaging networks (DIN)-PACS. The JITPO reengineered this process incorporating multiple organizations and politics. The reengineered PACS process administered through the JITPO transformed the decision process and accountability from a single office to a consultative method that increased end-user knowledge, responsibility, and ownership in PACS. The JITPO continues to provide information and services that assist multiple groups and users in rendering PACS planning and implementation decisions. Local site project managers are involved from the outset and this end-user collaboration has made the sometimes difficult transition to PACS an easier and more acceptable process for all involved. Corporately, this process saved DoD sites millions by having PACS plans developed within the government and proposed to vendors second, and then having vendors respond specifically to those plans. The integrity and efficiency of the process have reduced the opportunity for implementing nonstandard systems while sharing resources and reducing wasted government dollars. This presentation will describe the chronology of changes, encountered obstacles, and lessons learned within the reengineering of the PACS process for DIN-PACS.

  6. Backward assembly planning with DFA analysis

    NASA Technical Reports Server (NTRS)

    Lee, Sukhan (Inventor)

    1992-01-01

    An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies is presented. The planning system analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc., that must occur during the assembly. Additionally, the planning handles nonreversible, as well as reversible, assembly tasks through backward assembly planning. In order to decrease the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.

  7. PDSS configuration control plan and procedures

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The payload development support system (PDSS) configuration control plan and procedures are presented. These plans and procedures establish the process for maintaining configuration control of the PDSS system, especially the Spacelab experiment interface device's (SEID) RAU, HRM, and PDI interface simulations and the PDSS ECOS DEP Services simulation. The plans and procedures as specified are designed to provide a simplified but complete configuration control process. The intent is to require a minimum amount of paperwork but provide total traceability of PDSS during experiment test activities.

  8. Integrating intelligent transportation systems within the transportation planning process : an interim handbook.

    DOT National Transportation Integrated Search

    1998-01-01

    The Final Rule on Statewide Planning and Metropolitan Planning issued by the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) in October, 1993 established revised and more comprehensive processes for metropolitan and sta...

  9. The California general plan process and sustainable transportation planning

    DOT National Transportation Integrated Search

    2001-11-01

    This study reviewed the current and potential utility of California's General Plan process as a tool for promoting more sustainable local transportation systems The study used multiple methods to investigate this issue, including: 1. An extensive lit...

  10. Renewable Energy Zone (REZ) Transmission Planning Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Nathan

    A REZ is a geographical area that enables the development of profitable, cost-effective, grid-connected renewable energy (RE). The REZ Transmission Planning Process is a proactive approach to plan, approve, and build transmission infrastructure connecting REZs to the power system which helps to increase the share of solar, wind and other RE resources in the power system while maintaining reliability and economics, and focuses on large-scale wind and solar resources that can be developed in sufficient quantities to warrant transmission system expansion and upgrades.

  11. Systemic safety project selection tool.

    DOT National Transportation Integrated Search

    2013-07-01

    "The Systemic Safety Project Selection Tool presents a process for incorporating systemic safety planning into traditional safety management processes. The Systemic Tool provides a step-by-step process for conducting systemic safety analysis; conside...

  12. 45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Processing and Information Retrieval System Guide. The initial advance automatic data processing planning... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...

  13. Integrated flexible manufacturing program for manufacturing automation and rapid prototyping

    NASA Technical Reports Server (NTRS)

    Brooks, S. L.; Brown, C. W.; King, M. S.; Simons, W. R.; Zimmerman, J. J.

    1993-01-01

    The Kansas City Division of Allied Signal Inc., as part of the Integrated Flexible Manufacturing Program (IFMP), is developing an integrated manufacturing environment. Several systems are being developed to produce standards and automation tools for specific activities within the manufacturing environment. The Advanced Manufacturing Development System (AMDS) is concentrating on information standards (STEP) and product data transfer; the Expert Cut Planner system (XCUT) is concentrating on machining operation process planning standards and automation capabilities; the Advanced Numerical Control system (ANC) is concentrating on NC data preparation standards and NC data generation tools; the Inspection Planning and Programming Expert system (IPPEX) is concentrating on inspection process planning, coordinate measuring machine (CMM) inspection standards and CMM part program generation tools; and the Intelligent Scheduling and Planning System (ISAPS) is concentrating on planning and scheduling tools for a flexible manufacturing system environment. All of these projects are working together to address information exchange, standardization, and information sharing to support rapid prototyping in a Flexible Manufacturing System (FMS) environment.

  14. National transport planning in Norway and Sweden : a comparison

    DOT National Transportation Integrated Search

    2001-10-01

    This report seeks to identify those differences in planning processes and planning systems that nevertheless exist and aims at analysing how such differences have influenced the process and the output. The report is based on two previous reports on t...

  15. Core and Off-Core Processes in Systems Engineering

    NASA Technical Reports Server (NTRS)

    Breidenthal, Julian; Forsberg, Kevin

    2010-01-01

    An emerging methodology of organizing systems-engineering plans is based on a concept of core and off-core processes or activities. This concept has emerged as a result of recognition of a risk in the traditional representation of systems-engineering plans by a Vee model alone, according to which a large system is decomposed into levels of smaller subsystems, then integrated through levels of increasing scope until the full system is constructed. Actual systems-engineering activity is more complicated, raising the possibility that the staff will become confused in the absence of plans which explain the nature and ordering of work beyond the traditional Vee model.

  16. Measuring Business Process Learning with Enterprise Resource Planning Systems to Improve the Value of Education

    ERIC Educational Resources Information Center

    Monk, Ellen F.; Lycett, Mark

    2016-01-01

    Enterprise Resource Planning Systems (ERP) are very large and complex software packages that run every aspect of an organization. Increasingly, ERP systems are being used in higher education as one way to teach business processes, essential knowledge for students competing in today's business environment. Past research attempting to measure…

  17. North Dakota Metropolitan Planning Organization's peer exchange on introducing performance management into the MPO planning process : A TPCB Exchange

    DOT National Transportation Integrated Search

    1997-02-01

    This technical memorandum was developed as part of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study was to define the requirements and develop a plan for a national progr...

  18. Airport Planning and Development Process: Analysis and Documentation Report

    DOT National Transportation Integrated Search

    1997-01-01

    The Federal Aviation Administration (FAA) is facing extreme resource constraints : and increasing demands on the aviation system. The Airport Planning and : Development Process (APDP) links organizations, people, and processes together : to provide c...

  19. Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

    NASA Technical Reports Server (NTRS)

    Dickinson, William B.

    1995-01-01

    An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

  20. Management Information System Based on the Balanced Scorecard

    ERIC Educational Resources Information Center

    Kettunen, Juha; Kantola, Ismo

    2005-01-01

    Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…

  1. 36 CFR 219.3 - Overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... System Land and Resource Management Planning The Framework for Planning § 219.3 Overview. (a) The planning framework. Land and resource management planning is a flexible process for fitting solutions to... responsible for national planning. National planning includes the Forest Service national strategic plan...

  2. SU-G-TeP4-06: An Integrated Application for Radiation Therapy Treatment Plan Directives, Management, and Reporting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matuszak, M; Anderson, C; Lee, C

    Purpose: With electronic medical records, patient information for the treatment planning process has become disseminated across multiple applications with limited quality control and many associated failure modes. We present the development of a single application with a centralized database to manage the planning process. Methods: The system was designed to replace current functionalities of (i) static directives representing the physician intent for the prescription and planning goals, localization information for delivery, and other information, (ii) planning objective reports, (iii) localization and image guidance documents and (iv) the official radiation therapy prescription in the medical record. Using the Eclipse Scripting Applicationmore » Programming Interface, a plug-in script with an associated domain-specific SQL Server database was created to manage the information in (i)–(iv). The system’s user interface and database were designed by a team of physicians, clinical physicists, database experts, and software engineers to ensure usability and robustness for clinical use. Results: The resulting system has been fully integrated within the TPS via a custom script and database. Planning scenario templates, version control, approvals, and logic-based quality control allow this system to fully track and document the planning process as well as physician approval of tradeoffs while improving the consistency of the data. Multiple plans and prescriptions are supported along with non-traditional dose objectives and evaluation such as biologically corrected models, composite dose limits, and management of localization goals. User-specific custom views were developed for the attending physician review, physicist plan checks, treating therapists, and peer review in chart rounds. Conclusion: A method was developed to maintain cohesive information throughout the planning process within one integrated system by using a custom treatment planning management application that interfaces directly with the TPS. Future work includes quantifying the improvements in quality, safety and efficiency that are possible with the routine clinical use of this system. Supported in part by NIH-P01-CA-059827.« less

  3. Space Station Mission Planning System (MPS) development study. Volume 2

    NASA Technical Reports Server (NTRS)

    Klus, W. J.

    1987-01-01

    The process and existing software used for Spacelab payload mission planning were studied. A complete baseline definition of the Spacelab payload mission planning process was established, along with a definition of existing software capabilities for potential extrapolation to the Space Station. This information was used as a basis for defining system requirements to support Space Station mission planning. The Space Station mission planning concept was reviewed for the purpose of identifying areas where artificial intelligence concepts might offer substantially improved capability. Three specific artificial intelligence concepts were to be investigated for applicability: natural language interfaces; expert systems; and automatic programming. The advantages and disadvantages of interfacing an artificial intelligence language with existing FORTRAN programs or of converting totally to a new programming language were identified.

  4. State/federal interaction of LANDSAT system and related technical assistance

    NASA Technical Reports Server (NTRS)

    Tesser, P. A.

    1981-01-01

    The history of state involvement in LANDSAT systems planning and related efforts is described. Currently 16 states have visual LANDSAT capabilities and 10 others are planning on developing such capabilities. The federal government's future plans for the LANDSAT system, the impacts of recent budget decisions on the systems, and the FY 82 budget process are examined.

  5. Evaluation of effectiveness of information systems implementation in organization (by example of ERP-systems)

    NASA Astrophysics Data System (ADS)

    Demyanova, O. V.; Andreeva, E. V.; Sibgatullina, D. R.; Kireeva-Karimova, A. M.; Gafurova, A. Y.; Zakirova, Ch S.

    2018-05-01

    ERP in a modern enterprise information system allowed optimizing internal business processes, reducing production costs and increasing the attractiveness of enterprises for investors. It is an important component of success in the competition and an important condition for attracting investments in the key sector of the state. A vivid example of these systems are enterprise information systems using the methodology of ERP (Enterprise Resource Planning - enterprise resource planning). ERP is an integrated set of methods, processes, technologies and tools. It is based on: supply chain management; advanced planning and scheduling; sales automation; tool responsible for configuring; final resource planning; intelligence business; OLAP technology; block e- Commerce; management of product data. The main purpose of ERP systems is the automation of interrelated processes of planning, accounting and management in key areas of the company. ERP systems are automated systems that effectively address complex problems, including optimal allocation of business resources, ensuring quick and efficient delivery of goods and services to the consumer. Knowledge embedded in ERP systems provided enterprise-wide automation to introduce the activities of all functional departments of the company as a single complex system. At the level of quality estimates, most managers understand that the implementations of ERP systems is a necessary and useful procedure. Assessment of the effectiveness of the information systems implementation is relevant.

  6. Linking the Teacher Appraisal Process to the School Improvement Plan

    ERIC Educational Resources Information Center

    Reddekopp, Therese

    2007-01-01

    If a school improvement plan includes input from all stakeholders and focuses on data-driven processes that are linked to teacher appraisal, it can be powerful in leading the school toward the common mission of achieving student success. Linking the school improvement plan to the teacher appraisal process creates a system whereby all individuals…

  7. Application of Particle Swarm Optimization in Computer Aided Setup Planning

    NASA Astrophysics Data System (ADS)

    Kafashi, Sajad; Shakeri, Mohsen; Abedini, Vahid

    2011-01-01

    New researches are trying to integrate computer aided design (CAD) and computer aided manufacturing (CAM) environments. The role of process planning is to convert the design specification into manufacturing instructions. Setup planning has a basic role in computer aided process planning (CAPP) and significantly affects the overall cost and quality of machined part. This research focuses on the development for automatic generation of setups and finding the best setup plan in feasible condition. In order to computerize the setup planning process, three major steps are performed in the proposed system: a) Extraction of machining data of the part. b) Analyzing and generation of all possible setups c) Optimization to reach the best setup plan based on cost functions. Considering workshop resources such as machine tool, cutter and fixture, all feasible setups could be generated. Then the problem is adopted with technological constraints such as TAD (tool approach direction), tolerance relationship and feature precedence relationship to have a completely real and practical approach. The optimal setup plan is the result of applying the PSO (particle swarm optimization) algorithm into the system using cost functions. A real sample part is illustrated to demonstrate the performance and productivity of the system.

  8. A plan for structured management of the Systems Approach to Training (SAT) process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schurman, D.L.

    1987-01-01

    This paper describes the plan and accomplishments for development of a Systematic Management Plan for the Systems Approach to Training (SMPSAT). This project is sponsored by the United States Marine Corps Headquarters training policy branch (HQMC(TAP)). Purpose of this effort is to develop a comprehensive plan for management of the Systems Approach to Training (SAT) system in the USMC. This management plan will allow HQMC to monitor the SAT system in order to provide maximum support to the SAT system in both the formal schools and the Fleet Marine Force.

  9. Ground data systems resource allocation process

    NASA Technical Reports Server (NTRS)

    Berner, Carol A.; Durham, Ralph; Reilly, Norman B.

    1989-01-01

    The Ground Data Systems Resource Allocation Process at the Jet Propulsion Laboratory provides medium- and long-range planning for the use of Deep Space Network and Mission Control and Computing Center resources in support of NASA's deep space missions and Earth-based science. Resources consist of radio antenna complexes and associated data processing and control computer networks. A semi-automated system was developed that allows operations personnel to interactively generate, edit, and revise allocation plans spanning periods of up to ten years (as opposed to only two or three weeks under the manual system) based on the relative merit of mission events. It also enhances scientific data return. A software system known as the Resource Allocation and Planning Helper (RALPH) merges the conventional methods of operations research, rule-based knowledge engineering, and advanced data base structures. RALPH employs a generic, highly modular architecture capable of solving a wide variety of scheduling and resource sequencing problems. The rule-based RALPH system has saved significant labor in resource allocation. Its successful use affirms the importance of establishing and applying event priorities based on scientific merit, and the benefit of continuity in planning provided by knowledge-based engineering. The RALPH system exhibits a strong potential for minimizing development cycles of resource and payload planning systems throughout NASA and the private sector.

  10. Process test plan, phase II: waste retrieval sluicing system emissions collection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    POWERS, R.L.

    1999-06-01

    This Process Test Plan is prepared to continue from HNF-3733 which was Phase I of the test. Supplemental operational controls and sampling requirements are defined to safely obtain gas samples from the 296-C-006 ventilation system stack during active operation of the sluicing equipment.

  11. Creating a nursing strategic planning framework based on evidence.

    PubMed

    Shoemaker, Lorie K; Fischer, Brenda

    2011-03-01

    This article describes an evidence-informed strategic planning process and framework used by a Magnet-recognized public health system in California. This article includes (1) an overview of the organization and its strategic planning process, (2) the structure created within nursing for collaborative strategic planning and decision making, (3) the strategic planning framework developed based on the organization's balanced scorecard domains and the new Magnet model, and (4) the process undertaken to develop the nursing strategic priorities. Outcomes associated with the structure, process, and key initiatives are discussed throughout the article. Copyright © 2011 Elsevier Inc. All rights reserved.

  12. Strategic planning--a plan for excellence for South Haven Health System.

    PubMed

    Urbanski, Joanne; Baskel, Maureen; Martelli, Mary

    2011-01-01

    South Haven Health System has developed an innovative approach to strategic planning. The key to success of this process has been the multidisciplinary involvement of all stakeholders from the first planning session through the final formation of a strategic plan with measurable objectives for each goal. The process utilizes a Conversation Café method for identifying opportunities and establishing goals, Strategic Oversight Teams to address each goal and a Champion for implementation of each objective. Progress is measured quarterly by Strategic Oversight Team report cards. Transparency of communication within the organization and the sharing of information move the plan forward. The feedback from participant evaluations has been overwhelmingly positive. They are involved and excited.

  13. 45 CFR 205.36 - State plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., of an automated statewide management information system designed effectively and efficiently, to assist management in the administration of an approved AFDC State plan. The submission process to amend... account for— (1) All the factors in the total eligibility determination process under the plan for aid...

  14. Waste receiving and processing facility module 1 data management system software project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clark, R.E.

    1994-11-02

    This document provides the software development plan for the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store, and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.

  15. Decision support systems and the healthcare strategic planning process: a case study.

    PubMed

    Lundquist, D L; Norris, R M

    1991-01-01

    The repertoire of applications that comprises health-care decision support systems (DSS) includes analyses of clinical, financial, and operational activities. As a whole, these applications facilitate developing comprehensive and interrelated business and medical models that support the complex decisions required to successfully manage today's health-care organizations. Kennestone Regional Health Care System's use of DSS to facilitate strategic planning has precipitated marked changes in the organization's method of determining capital allocations. This case study discusses Kennestone's use of DSS in the strategic planning process, including profiles of key DSS modeling components.

  16. At the Ready: Planning for Business Continuity

    ERIC Educational Resources Information Center

    Sharp, Linda

    2011-01-01

    School system leaders never know when disaster may strike. Having a plan in place to protect vital data and systems is crucial. School system leaders need to be actively involved in crisis preparedness, planned response, and recovery to ensure student and staff safety and to make certain that all important operations, services, processes, and…

  17. Information security management system planning for CBRN facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  18. Succession Planning in a Two-Year Technical College System

    ERIC Educational Resources Information Center

    Neefe, Diane Osterhaus

    2009-01-01

    The study explores the organizational characteristics of strategic planning, succession planning and career management and the processes impact on the hiring location of academic leaders from within the college, external to the college but within the system, and external to the system. The study was conducted in the 16 college Wisconsin…

  19. Artificial intelligence techniques for scheduling Space Shuttle missions

    NASA Technical Reports Server (NTRS)

    Henke, Andrea L.; Stottler, Richard H.

    1994-01-01

    Planning and scheduling of NASA Space Shuttle missions is a complex, labor-intensive process requiring the expertise of experienced mission planners. We have developed a planning and scheduling system using combinations of artificial intelligence knowledge representations and planning techniques to capture mission planning knowledge and automate the multi-mission planning process. Our integrated object oriented and rule-based approach reduces planning time by orders of magnitude and provides planners with the flexibility to easily modify planning knowledge and constraints without requiring programming expertise.

  20. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  1. The flight planning - flight management connection

    NASA Technical Reports Server (NTRS)

    Sorensen, J. A.

    1984-01-01

    Airborne flight management systems are currently being implemented to minimize direct operating costs when flying over a fixed route between a given city pair. Inherent in the design of these systems is that the horizontal flight path and wind and temperature models be defined and input into the airborne computer before flight. The wind/temperature model and horizontal path are products of the flight planning process. Flight planning consists of generating 3-D reference trajectories through a forecast wind field subject to certain ATC and transport operator constraints. The interrelationships between flight management and flight planning are reviewed, and the steps taken during the flight planning process are summarized.

  2. Opportunities for energy conservation in transportation planning and systems management.

    DOT National Transportation Integrated Search

    1978-01-01

    This report is a summary, based primarily on a literature review, of the energy-savings potential of the elements in the transportation planning process and systems management. Within the scope of long-range planning, the energy aspects of land use a...

  3. Master Plan for Data Processing Services, 1988-1993. Report.

    ERIC Educational Resources Information Center

    Connecticut Regional Community Colleges, Hartford. Board of Trustees.

    Developed in accordance with a legislative mandate, this master plan for Connecticut's regional community colleges provides baseline data on the current status of data processing; identifies issues, trends, and constraints; and sets forth specific plans for computing activities and services within the community college system. Introductory…

  4. A Process for Planning.

    ERIC Educational Resources Information Center

    Gurowitz, William D.; And Others

    1988-01-01

    Describes how Division of Campus Life at Cornell University conducted long-range planning and the results of its 2-year effort. Explains 2 (strategic and organizational) by 3 (diagnosis, formulation, and execution) matrix providing systems view from describing and evaluating long-range planning. Presents 10-step process implemented at Cornell. (NB)

  5. Backward assembly planning with DFA analysis

    NASA Technical Reports Server (NTRS)

    Lee, Sukhan (Inventor)

    1995-01-01

    An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies, and analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans is presented. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc. that must occur during the assembly, and handles nonreversible as well as reversible assembly tasks through backward assembly planning. In order to increase the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.

  6. Computer Security: Governmentwide Planning Process Had Limited Impact. Report to the Chairman, Committee on Science, Space, and Technology, House of Representatives.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC. Information Management and Technology Div.

    As required by the Computer Security Act of 1987, federal agencies have to identify systems that contain sensitive information and develop plans to safeguard them. The planning process was assessed in 10 civilian agencies as well as the extent to which they had implemented planning controls described in 22 selected plans. The National Institute of…

  7. GIS-assisted spatial analysis for urban regulatory detailed planning: designer's dimension in the Chinese code system

    NASA Astrophysics Data System (ADS)

    Yu, Yang; Zeng, Zheng

    2009-10-01

    By discussing the causes behind the high amendments ratio in the implementation of urban regulatory detailed plans in China despite its law-ensured status, the study aims to reconcile conflict between the legal authority of regulatory detailed planning and the insufficient scientific support in its decision-making and compilation by introducing into the process spatial analysis based on GIS technology and 3D modeling thus present a more scientific and flexible approach to regulatory detailed planning in China. The study first points out that the current compilation process of urban regulatory detailed plan in China employs mainly an empirical approach which renders it constantly subjected to amendments; the study then discusses the need and current utilization of GIS in the Chinese system and proposes the framework of a GIS-assisted 3D spatial analysis process from the designer's perspective which can be regarded as an alternating processes between the descriptive codes and physical design in the compilation of regulatory detailed planning. With a case study of the processes and results from the application of the framework, the paper concludes that the proposed framework can be an effective instrument which provides more rationality, flexibility and thus more efficiency to the compilation and decision-making process of urban regulatory detailed plan in China.

  8. Regional health workforce planning through action research: lessons for commissioning health services from a case study in Far North Queensland.

    PubMed

    Panzera, Annette June; Murray, Richard; Stewart, Ruth; Mills, Jane; Beaton, Neil; Larkins, Sarah

    2016-01-01

    Creating a stable and sustainable health workforce in regional, rural and remote Australia has long been a challenge to health workforce planners, policy makers and researchers alike. Traditional health workforce planning is often reactive and assumes continuation of current patterns of healthcare utilisation. This demonstration project in Far North Queensland exemplifies how participatory regional health workforce planning processes can accurately model current and projected local workforce requirements. The recent establishment of Primary Health Networks (PHNs) with the intent to commission health services tailored to individual healthcare needs underlines the relevance of such an approach. This study used action research methodology informed by World Health Organization (WHO) systems thinking. Four cyclical stages of health workforce planning were followed: needs assessment; health service model redesign; skills-set assessment and workforce redesign; and development of a workforce and training plan. This study demonstrated that needs-based loco-regional health workforce planning can be achieved successfully through participatory processes with stakeholders. Stronger health systems and workforce training solutions were delivered by facilitating linkages and planning processes based on community need involving healthcare professionals across all disciplines and sectors. By focusing upon extending competencies and skills sets, local health professionals form a stable and sustainable local workforce. Concrete examples of initiatives generated from this process include developing a chronic disease inter-professional teaching clinic in a rural town and renal dialysis being delivered locally to an Aboriginal community. The growing trend of policy makers decentralising health funding, planning and accountability and rising health system costs increase the future utility of this approach. This type of planning can also assist the new PHNs to commission health services that meet the needs of the population and contribute to service and system improvement and innovation.

  9. Integrated Design System (IDS) Tools for the Spacecraft Aeroassist/Entry Vehicle Design Process

    NASA Technical Reports Server (NTRS)

    Olynick, David; Braun, Robert; Langhoff, Steven R. (Technical Monitor)

    1997-01-01

    The definition of the Integrated Design System technology focus area as presented in the NASA Information Technology center of excellence strategic plan is described. The need for IDS tools in the aeroassist/entry vehicle design process is illustrated. Initial and future plans for spacecraft IDS tool development are discussed.

  10. Systemic Operational Design: An Alternative to Estimate Planning

    DTIC Science & Technology

    2009-05-04

    relationships found in the COE. Framing and campaign design, with emphasis on systems theory , have therefore made their way to the forefront of doctrinal...short explanation of the systems theory behind SOD, examines how the SOD process happens, and compares SOD with the time proven “Commander’s Estimate... Theory , Campaign planning, Contemporary Operating Environment, Commander’s Estimate Process, Operational design 16. SECURITY CLASSIFICATION OF

  11. Systems view on spatial planning and perception based on invariants in agent-environment dynamics

    PubMed Central

    Mettler, Bérénice; Kong, Zhaodan; Li, Bin; Andersh, Jonathan

    2015-01-01

    Modeling agile and versatile spatial behavior remains a challenging task, due to the intricate coupling of planning, control, and perceptual processes. Previous results have shown that humans plan and organize their guidance behavior by exploiting patterns in the interactions between agent or organism and the environment. These patterns, described under the concept of Interaction Patterns (IPs), capture invariants arising from equivalences and symmetries in the interaction with the environment, as well as effects arising from intrinsic properties of human control and guidance processes, such as perceptual guidance mechanisms. The paper takes a systems' perspective, considering the IP as a unit of organization, and builds on its properties to present a hierarchical model that delineates the planning, control, and perceptual processes and their integration. The model's planning process is further elaborated by showing that the IP can be abstracted, using spatial time-to-go functions. The perceptual processes are elaborated from the hierarchical model. The paper provides experimental support for the model's ability to predict the spatial organization of behavior and the perceptual processes. PMID:25628524

  12. Evaluation tools to support ITS planning process : development of a sketch planning tool in FSUTMS/cube environment.

    DOT National Transportation Integrated Search

    2008-12-15

    Intelligent Transportation Systems (ITS) planning requires the use of tools to assess the performance of ITS deployment alternatives relative to each other and to other types of transportation system improvement alternatives. This research project in...

  13. A scientific operations plan for the large space telescope. [ground support system design

    NASA Technical Reports Server (NTRS)

    West, D. K.

    1977-01-01

    The paper describes an LST ground system which is compatible with the operational requirements of the LST. The goal of the approach is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of LST science. Attention is given to cost constraints and guidelines, the telemetry operations processing systems (TELOPS), the image processing facility, ground system planning and data flow, and scientific interfaces.

  14. State involvement in and use of LANDSAT technology

    NASA Technical Reports Server (NTRS)

    Tessar, P. A.

    1981-01-01

    The background of state involvement in LANDSAT systems planning and the status of state LANDSAT use are reviewed. Major recommendations on data continuity; frequency and pattern of observation; state representation in program management; pointable sensors for a fully operational system; data processing systems; data pricing; data copyright; data archival; and technology transfer are highlighted. Plans of the government regarding the LANDSAT system are reflected in the FY-1982 budget process are examined.

  15. The Mission Operations Planning Assistant

    NASA Technical Reports Server (NTRS)

    Schuetzle, James G.

    1987-01-01

    The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

  16. The mission operations planning assistant

    NASA Technical Reports Server (NTRS)

    Schuetzle, James G.

    1987-01-01

    The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Prinicpal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZETALISP and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

  17. Resource Allocation Planning Helper (RALPH): Lessons learned

    NASA Technical Reports Server (NTRS)

    Durham, Ralph; Reilly, Norman B.; Springer, Joe B.

    1990-01-01

    The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility.

  18. Modeling Transportation Systems : an Overview

    DOT National Transportation Integrated Search

    1971-06-01

    The purpose of this report is to outline the role of systems analysis and mathematical modeling in the planning of transportation systems. The planning process is divided into three sectors (demand, supply, and policy) reflecting the demand for trans...

  19. Autonomous Vehicle Mission Planning Using AI (Artificial Intelligence) Techniques.

    DTIC Science & Technology

    1985-12-01

    it uses are declarative patterns that encode facts about how goals may give rise to - . plans. The program processes a story a sentence at a time...the planning process. By separating the knowledge about how to plan from the specific domain knowledge, an understander can use this knowledge about how ...path planning program developed in a previous thesis effort will be incorporated into the overall program in order to demonstrate the operating system

  20. Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success

    DTIC Science & Technology

    2009-09-01

    comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project...Milestone Documentation, Project Planning, Rational Frame, Political Frame, CMMI Project Planning Process Area, CMMI Risk Management Process Area...well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project Planning and Risk Management process areas. The intent is to

  1. Miami Valley ITS : early deployment plan : final user service plan

    DOT National Transportation Integrated Search

    1997-07-01

    This User Service Plan is the first major product of the process to develop an Intelligent Transportation System (ITS) Early Deployment Plan (EDP) for the Miami Valley. This User Service Plan documents the travel environment, growth trends and transp...

  2. Planning applications in image analysis

    NASA Technical Reports Server (NTRS)

    Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.

    1994-01-01

    We describe two interim results from an ongoing effort to automate the acquisition, analysis, archiving, and distribution of satellite earth science data. Both results are applications of Artificial Intelligence planning research to the automatic generation of processing steps for image analysis tasks. First, we have constructed a linear conditional planner (CPed), used to generate conditional processing plans. Second, we have extended an existing hierarchical planning system to make use of durations, resources, and deadlines, thus supporting the automatic generation of processing steps in time and resource-constrained environments.

  3. Integrated urban systems model with multiple transportation supply agents.

    DOT National Transportation Integrated Search

    2012-10-01

    This project demonstrates the feasibility of developing quantitative models that can forecast future networks under : current and alternative transportation planning processes. The current transportation planning process is modeled : based on empiric...

  4. Using community-based evidence for decentralized health planning: insights from Maharashtra, India.

    PubMed

    Shukla, Abhay; Khanna, Renu; Jadhav, Nitin

    2018-01-01

    Health planning is generally considered a technical subject, primarily the domain of health officials with minimal involvement of community representatives. The National Rural Health Mission launched in India in 2005 recognized this gap and mandated mechanisms for decentralized health planning. However, since planning develops in the context of highly unequal power relations, formal spaces for participation are necessary but not sufficient. Hence a project on capacity building for decentralized health planning was implemented in selected districts of Maharashtra, India during 2010-13. This process developed on the platform of officially supported community-based monitoring and planning, a process for community feedback and participation towards health system change. A specific project on capacity building for decentralized planning included a structured learning course and workshops for major stakeholders. An evaluation of the project, including in-depth interviews of various participants and analysis of change in local health planning processes, revealed positive changes in intervention areas, including increased capacity of key stakeholders leading to preparation of evidence-based, innovative planning proposals, significant community oriented changes in utilization of health facility funds, and inclusion of community-based proposals in village, health facility-based block and district plans. Transparency related to planning increased along with responsiveness of health providers to community suggestions. A key lesson is that active facilitation of decentralized health planning and influencing the health system to expand participation, are essential to ensure changes in planning. Effective strategies included: identifying people's health service related priorities through community-based monitoring, capacity building of diverse stakeholders regarding local health planning, and advocacy to enable participation of community-based actors in the planning process. This combination of strategies draws upon the framework of 'empowered participatory governance' which necessitates combining a degree of 'countervailing power' and acceptance of participation by the system, for new forms of governance to emerge. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine © The Author 2014; all rights reserved.

  5. Framework and components for effective discharge planning system: a delphi methodology

    PubMed Central

    2012-01-01

    Background To reduce avoidable hospital readmissions, effective discharge planning and appropriate post discharge support care are key requirements. This study is a 3-staged process to develop, pretest and pilot a framework for an effective discharge planning system in Hong Kong. This paper reports on the methodology of Delphi approach and findings of the second stage on pre-testing the framework developed so as to validate and attest to its applicability and practicability in which consensus was sought on the key components of discharge planning. Methods Delphi methodology was adopted to engage a group of experienced healthcare professionals to rate and discuss the framework and components of an effective discharge planning. The framework was consisted 36 statements under 5 major themes: initial screening, discharge planning process, coordination of discharge, implementation of discharge, and post discharge follow-up. Each statement was rated independently based on 3 aspects including clarity, validity and applicability on a 5-point Likert-scale. Statement with 75% or above of participants scoring 4–5 on all 3 aspects would be included in the discharge planning framework. For those statements not reaching 75% of consensus in any one of the aspect, it would be revised or discarded following the group discussion, and be re-rated in another round. Results A total of 24 participants participated in the consensus-building process. In round one rating, consensus was achieved in 25 out of 36 statements. Among those 11 statements not reaching consensus, the major concern was related to the “applicability” of the statements. The participants expressed a lack of manpower, skills and time in particular during weekends and long holidays in carrying out assessment and care plans within 24 h after admission. There were also timeliness and availability issue in providing transportation and necessary equipment to the patients. To make the statements more applicable, the wordings of some of the statements were revised to provide greater flexibility. Due to the lack of a statement in clarifying the role of the members of the healthcare professional team, one additional statement on the role and responsibility of the multidisciplinary team members was added. The first theme on “initial screening” was further revised to “initial screening and assessment” to better reflect the first stage of discharge planning process. After two rounds of rating process, all the 36 statements and the newly added statement reached consensus Conclusions A structured, systematic and coordinated system of hospital discharge system is required to facilitate the discharge process to ensure a smooth patient transition from the hospital to the community and improve patient health outcome in both clinical and social aspect. The findings of this paper provide a reference framework helping policymakers and hospital managers to facilitate the development of a coherent and systematized discharge planning process. Adopting a Delphi approach also demonstrates the values of the method as a pre-test (before the clinical run) of the components and requirements of a discharge planning system taking into account of the local context and system constraints, which would lead to improvements to its applicability and practicability. To confirm the applicability and practicability of this consensus framework for discharge planning system, the third stage of process of development of the discharge planning framework is to apply and pilot the framework in a hospital setting to evaluate its feasibility, applicability and impact in hospital including satisfaction from both the perspectives of staff and patients. PMID:23151173

  6. Designing urban rules from emergent patterns: co-evolving paths of informal and formal urban systems - the case of Portugal

    NASA Astrophysics Data System (ADS)

    Silva, Paulo

    2018-05-01

    In many societies, informality has been a relevant part of the construction of the urban fabric. This is valid along a city’s history and in recent urbanization processes. In the past, informality was in the origin of many of urban planning. Very soon urban planning adopted, as one of their main missions malfunctions in cities. Therefore, the need of formalization became one of the main reasons on the emergence, the control of informal processes. As an answer to informal individual solutions, urban planning responded with standardized rules and the urge of creating spaces fitting into pre-established rules instead of rules fitting into spaces. Urban planning as a discipline has gradually changed its path. The contrast between urbanization promoted under formal urban planning and informal urbanization is only one sign of the mismatch between urban planning actions and informal urbanization dynamics. Considering this tension between formal and informal dynamics, in some cases, planning rules and planning processes continue ignoring informal dynamics; in other cases, planning rules are designed to integrate informality “without losing its face” through “planning games” [1]; and a third and less explored way in which planning systems interact with informality and from that interaction learn how to improve (we consider it a process of enrichment) planning rules while they promote an upgrade of informal interventions [2]. This latter win-win situation in which both informal and formal systems benefit from their interaction is still rare: most of the time either only one side benefits or none benefit from the interaction. Nevertheless, there are signs that from this interaction co-dependent adaptation might occur with positive outcomes for the urban system – in which co-evolutionary dynamics can be traced. We propose to look at the way building rules have been designed in Europe in a context considered successful in the sense of dealing of informality – the one of Portugal. The country experienced a wave of informality associated with illegal urbanization since the 1960’s in the main urban areas. The process of interaction between informal and formal urban systems proved to be a success in statistic terms. Slum clearance reduced the existence of informal occupations to almost zero. Informal settlements involving land tenure have been dealt with in the last two decades with considerable positive impact in the urban fabric. Based on this, with this paper we will evaluate how informal and formal systems are impacting each other and changing along the time the shape of building and of planning rules. For this we will look at the planning tools created to formalize informal settlements in the Lisbon Metropolitan Area from the last forty years to see how urban and building rules were adapted to respond to the specific needs of informal settlements; how this adaptation moved from temporary and exceptional to permanent rules; finally, how were these new rules able to “contaminate” the general planning and building codes. We aim that these findings would help us to contribute to a “healthier” relation between formal and informal urban systems, not ignoring each other, not controlling each other but instead learning with each other. By achieving this, planning systems become more responsive; on the other hand, informal occupations can be upgraded without being destroyed with the contribution of the planning systems.

  7. Measuring information processing in a client with extreme agitation following traumatic brain injury using the Perceive, Recall, Plan and Perform System of Task Analysis.

    PubMed

    Nott, Melissa T; Chapparo, Christine

    2008-09-01

    Agitation following traumatic brain injury is characterised by a heightened state of activity with disorganised information processing that interferes with learning and achieving functional goals. This study aimed to identify information processing problems during task performance of a severely agitated adult using the Perceive, Recall, Plan and Perform (PRPP) System of Task Analysis. Second, this study aimed to examine the sensitivity of the PRPP System to changes in task performance over a short period of rehabilitation, and third, to evaluate the guidance provided by the PRPP in directing intervention. A case study research design was employed. The PRPP System of Task Analysis was used to assess changes in task embedded information processing capacity during occupational therapy intervention with a severely agitated adult in a rehabilitation context. Performance is assessed on three selected tasks over a one-month period. Information processing difficulties during task performance can be clearly identified when observing a severely agitated adult following a traumatic brain injury. Processing skills involving attention, sensory processing and planning were most affected at this stage of rehabilitation. These processing difficulties are linked to established descriptions of agitated behaviour. Fluctuations in performance across three tasks of differing processing complexity were evident, leading to hypothesised relationships between task complexity, environment and novelty with information processing errors. Changes in specific information processing capacity over time were evident based on repeated measures using the PRPP System of Task Analysis. This lends preliminary support for its utility as an outcome measure, and raises hypotheses about the type of therapy required to enhance information processing in people with severe agitation. The PRPP System is sensitive to information processing changes in severely agitated adults when used to reassess performance over short intervals and can provide direct guidance to occupational therapy intervention to improve task embedded information processing by categorising errors under four stages of an information processing model: Perceive, Recall, Plan and Perform.

  8. Disaster recovery plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adams, D.E.

    The BMS production implementation will be complete by October 1, 1998 and the server environment will be comprised of two types of platforms. The PassPort Supply and the PeopleSoft Financials will reside on LNIX servers and the PeopleSoft Human Resources and Payroll will reside on Microsoft NT servers. Because of the wide scope and the requirements of the COTS products to run in various environments backup and recovery responsibilities are divided between two groups in Technical Operations. The Central Computer Systems Management group provides support for the LTNIX/NT Backup Data Center, and the Network Infrastructure Systems group provides support formore » the NT Application Server Backup outside the Data Center. The disaster recovery process is dependent on a good backup and recovery process. Information and integrated system data for determining the disaster recovery process is identified from the Fluor Daniel Hanford (FDH) Risk Assessment Plan, Contingency Plan, and Backup and Recovery Plan, and Backup Form for HANDI 2000 BMS.« less

  9. SU-F-T-65: AutomaticTreatment Planning for High-Dose Rate (HDR) Brachytherapy with a VaginalCylinder Applicator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhou, Y; Tan, J; Jiang, S

    Purpose: High dose rate (HDR) brachytherapy treatment planning is conventionally performed in a manual fashion. Yet it is highly desirable to perform computerized automated planning to improve treatment planning efficiency, eliminate human errors, and reduce plan quality variation. The goal of this research is to develop an automatic treatment planning tool for HDR brachytherapy with a cylinder applicator for vaginal cancer. Methods: After inserting the cylinder applicator into the patient, a CT scan was acquired and was loaded to an in-house developed treatment planning software. The cylinder applicator was automatically segmented using image-processing techniques. CTV was generated based on user-specifiedmore » treatment depth and length. Locations of relevant points (apex point, prescription point, and vaginal surface point), central applicator channel coordinates, and dwell positions were determined according to their geometric relations with the applicator. Dwell time was computed through an inverse optimization process. The planning information was written into DICOM-RT plan and structure files to transfer the automatically generated plan to a commercial treatment planning system for plan verification and delivery. Results: We have tested the system retrospectively in nine patients treated with vaginal cylinder applicator. These cases were selected with different treatment prescriptions, lengths, depths, and cylinder diameters to represent a large patient population. Our system was able to generate treatment plans for these cases with clinically acceptable quality. Computation time varied from 3–6 min. Conclusion: We have developed a system to perform automated treatment planning for HDR brachytherapy with a cylinder applicator. Such a novel system has greatly improved treatment planning efficiency and reduced plan quality variation. It also served as a testbed to demonstrate the feasibility of automatic HDR treatment planning for more complicated cases.« less

  10. Use of information systems in Air Force medical treatment facilities in strategic planning and decision-making.

    PubMed

    Yap, Glenn A; Platonova, Elena A; Musa, Philip F

    2006-02-01

    An exploratory study used Ansoff's strategic planning model as a framework to assess perceived effectiveness of information systems in supporting strategic business plan development at Air Force medical treatment facilities (MTFs). Results showed information systems were most effective in supporting historical trend analysis, strategic business plans appeared to be a balance of operational and strategic plans, and facilities perceived a greater need for new clinical, vice administrative, information systems to support strategic planning processes. Administrators believed information systems should not be developed at the local level and perceived information systems have the greatest impact on improving clinical quality outcomes, followed by ability to deliver cost effective care and finally, ability to increase market share.

  11. Policy implications in developing a land use management information systems

    NASA Technical Reports Server (NTRS)

    Landini, A. J.

    1975-01-01

    The current land use map for the city of Los Angeles was developed by the guesstimation process and provides single stage information for each level in the critical geographical hierarchy for land use planning management. Processing and incorporation of LANDSAT data in the land use information system requires special funding; however, computergraphic maps are able to provide a viable information system for city planning and management.

  12. Planning ATES systems under uncertainty

    NASA Astrophysics Data System (ADS)

    Jaxa-Rozen, Marc; Kwakkel, Jan; Bloemendal, Martin

    2015-04-01

    Aquifer Thermal Energy Storage (ATES) can contribute to significant reductions in energy use within the built environment, by providing seasonal energy storage in aquifers for the heating and cooling of buildings. ATES systems have experienced a rapid uptake over the last two decades; however, despite successful experiments at the individual level, the overall performance of ATES systems remains below expectations - largely due to suboptimal practices for the planning and operation of systems in urban areas. The interaction between ATES systems and underground aquifers can be interpreted as a common-pool resource problem, in which thermal imbalances or interference could eventually degrade the storage potential of the subsurface. Current planning approaches for ATES systems thus typically follow the precautionary principle. For instance, the permitting process in the Netherlands is intended to minimize thermal interference between ATES systems. However, as shown in recent studies (Sommer et al., 2015; Bakr et al., 2013), a controlled amount of interference may benefit the collective performance of ATES systems. An overly restrictive approach to permitting is instead likely to create an artificial scarcity of available space, limiting the potential of the technology in urban areas. In response, master plans - which take into account the collective arrangement of multiple systems - have emerged as an increasingly popular alternative. However, permits and master plans both take a static, ex ante view of ATES governance, making it difficult to predict the effect of evolving ATES use or climactic conditions on overall performance. In particular, the adoption of new systems by building operators is likely to be driven by the available subsurface space and by the performance of existing systems; these outcomes are themselves a function of planning parameters. From this perspective, the interactions between planning authorities, ATES operators, and subsurface conditions form a complex adaptive system, for which agent-based modelling provides a useful analysis framework. This study therefore explores the interactions between endogenous ATES adoption processes and the relative performance of different planning schemes, using an agent-based adoption model coupled with a hydrologic model of the subsurface. The models are parameterized to simulate typical operating conditions for ATES systems in a dense urban area. Furthermore, uncertainties relating to planning parameters, adoption processes, and climactic conditions are explicitly considered using exploratory modelling techniques. Results are therefore presented for the performance of different planning policies over a broad range of plausible scenarios.

  13. Region Three Aerial Measurement System Flight Planning Tool - 12006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Messick, Chuck; Pham, Minh; Smith, Ron

    The Region 3 Aerial Measurement System Flight Planning Tool is used by the National Nuclear Security Agency (NNSA), United States Department of Energy, Radiological Assistance Program, Region 3, to respond to emergency radiological situations. The tool automates the flight planning package process while decreasing Aerial Measuring System response times and decreases the potential for human error. Deployment of the Region Three Aerial Measurement System Flight Planning Tool has resulted in an immediate improvement to the flight planning process in that time required for mission planning has been reduced from 1.5 hours to 15 minutes. Anecdotally, the RAP team reports thatmore » the rate of usable data acquired during surveys has improved from 40-60 percent to over 90 percent since they began using the tool. Though the primary product of the flight planning tool is a pdf format document for use by the aircraft flight crew, the RAP team has begun carrying their laptop computer on the aircraft during missions. By connecting a Global Positioning System (GPS) device to the laptop and using ESRI ArcMap's GPS tool bar to overlay the aircraft position directly on the flight plan in real time, the RAP team can evaluate and correct the aircraft position as the mission is executed. (authors)« less

  14. A College Planning Cycle. People Resources Process. A Practical Guide.

    ERIC Educational Resources Information Center

    National Association of College and University Business Officers, Washington, DC.

    The process described in this manual is one of the few systems for planning and budgeting in colleges and universities that is meticulously detailed. It includes the unique concepts of the planning team and the analytical studies team, and promotes a cooperative, integrated, and enthusiastic involvement of faculty, students, and staff from all…

  15. 36 CFR 219.3 - Overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... An interdisciplinary, collaborative approach to planning may be achieved by engaging the skills and... System Land and Resource Management Planning The Framework for Planning § 219.3 Overview. (a) The planning framework. Land and resource management planning is a flexible process for fitting solutions to...

  16. Faculty Planning, Development, and Evaluation System: Washtenaw Community College.

    ERIC Educational Resources Information Center

    Altieri, Guy; And Others

    Between 1989 and 1991, the Planning, Development and Evaluation (PDE) Committee of Washtenaw Community College (Michigan) designed a faculty assessment process focusing on professional development and academic planning. It is an approach in which all educators (faculty and administrators) work together, using the PDE system to continually define…

  17. A methodology for automatic intensity-modulated radiation treatment planning for lung cancer

    NASA Astrophysics Data System (ADS)

    Zhang, Xiaodong; Li, Xiaoqiang; Quan, Enzhuo M.; Pan, Xiaoning; Li, Yupeng

    2011-07-01

    In intensity-modulated radiotherapy (IMRT), the quality of the treatment plan, which is highly dependent upon the treatment planner's level of experience, greatly affects the potential benefits of the radiotherapy (RT). Furthermore, the planning process is complicated and requires a great deal of iteration, and is often the most time-consuming aspect of the RT process. In this paper, we describe a methodology to automate the IMRT planning process in lung cancer cases, the goal being to improve the quality and consistency of treatment planning. This methodology (1) automatically sets beam angles based on a beam angle automation algorithm, (2) judiciously designs the planning structures, which were shown to be effective for all the lung cancer cases we studied, and (3) automatically adjusts the objectives of the objective function based on a parameter automation algorithm. We compared treatment plans created in this system (mdaccAutoPlan) based on the overall methodology with plans from a clinical trial of IMRT for lung cancer run at our institution. The 'autoplans' were consistently better, or no worse, than the plans produced by experienced medical dosimetrists in terms of tumor coverage and normal tissue sparing. We conclude that the mdaccAutoPlan system can potentially improve the quality and consistency of treatment planning for lung cancer.

  18. Full Monte Carlo-Based Biologic Treatment Plan Optimization System for Intensity Modulated Carbon Ion Therapy on Graphics Processing Unit.

    PubMed

    Qin, Nan; Shen, Chenyang; Tsai, Min-Yu; Pinto, Marco; Tian, Zhen; Dedes, Georgios; Pompos, Arnold; Jiang, Steve B; Parodi, Katia; Jia, Xun

    2018-01-01

    One of the major benefits of carbon ion therapy is enhanced biological effectiveness at the Bragg peak region. For intensity modulated carbon ion therapy (IMCT), it is desirable to use Monte Carlo (MC) methods to compute the properties of each pencil beam spot for treatment planning, because of their accuracy in modeling physics processes and estimating biological effects. We previously developed goCMC, a graphics processing unit (GPU)-oriented MC engine for carbon ion therapy. The purpose of the present study was to build a biological treatment plan optimization system using goCMC. The repair-misrepair-fixation model was implemented to compute the spatial distribution of linear-quadratic model parameters for each spot. A treatment plan optimization module was developed to minimize the difference between the prescribed and actual biological effect. We used a gradient-based algorithm to solve the optimization problem. The system was embedded in the Varian Eclipse treatment planning system under a client-server architecture to achieve a user-friendly planning environment. We tested the system with a 1-dimensional homogeneous water case and 3 3-dimensional patient cases. Our system generated treatment plans with biological spread-out Bragg peaks covering the targeted regions and sparing critical structures. Using 4 NVidia GTX 1080 GPUs, the total computation time, including spot simulation, optimization, and final dose calculation, was 0.6 hour for the prostate case (8282 spots), 0.2 hour for the pancreas case (3795 spots), and 0.3 hour for the brain case (6724 spots). The computation time was dominated by MC spot simulation. We built a biological treatment plan optimization system for IMCT that performs simulations using a fast MC engine, goCMC. To the best of our knowledge, this is the first time that full MC-based IMCT inverse planning has been achieved in a clinically viable time frame. Copyright © 2017 Elsevier Inc. All rights reserved.

  19. Using a participatory evaluation design to create an online data collection and monitoring system for New Mexico's Community Health Councils.

    PubMed

    Andrews, M L; Sánchez, V; Carrillo, C; Allen-Ananins, B; Cruz, Y B

    2014-02-01

    We present the collaborative development of a web-based data collection and monitoring plan for thirty-two county councils within New Mexico's health council system. The monitoring plan, a key component in our multiyear participatory statewide evaluation process, was co-developed with the end users: representatives of the health councils. Guided by the Institute of Medicine's Community, Health Improvement Process framework, we first developed a logic model that delineated processes and intermediate systems-level outcomes in council development, planning, and community action. Through the online system, health councils reported data on intermediate outcomes, including policy changes and funds leveraged. The system captured data that were common across the health council system, yet was also flexible so that councils could report their unique accomplishments at the county level. A main benefit of the online system was that it provided the ability to assess intermediate, outcomes across the health council system. Developing the system was not without challenges, including creating processes to ensure participation across a large rural state; creating shared understanding of intermediate outcomes and indicators; and overcoming technological issues. Even through the challenges, however, the benefits of committing to using participatory processes far outweighed the challenges. Copyright © 2013 Elsevier Ltd. All rights reserved.

  20. Information Systems for University Planning.

    ERIC Educational Resources Information Center

    Robinson, Robert J.

    This paper proposes construction of a separate data base environment for university planning information, distinct from data bases and systems supporting operational functioning and management. The data base would receive some of its input from the management information systems (MIS)/transactional data bases and systems through a process of…

  1. MO-D-213-01: Workflow Monitoring for a High Volume Radiation Oncology Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laub, S; Dunn, M; Galbreath, G

    2015-06-15

    Purpose: Implement a center wide communication system that increases interdepartmental transparency and accountability while decreasing redundant work and treatment delays by actively monitoring treatment planning workflow. Methods: Intake Management System (IMS), a program developed by ProCure Treatment Centers Inc., is a multi-function database that stores treatment planning process information. It was devised to work with the oncology information system (Mosaiq) to streamline interdepartmental workflow.Each step in the treatment planning process is visually represented and timelines for completion of individual tasks are established within the software. The currently active step of each patient’s planning process is highlighted either red or greenmore » according to whether the initially allocated amount of time has passed for the given process. This information is displayed as a Treatment Planning Process Monitor (TPPM), which is shown on screens in the relevant departments throughout the center. This display also includes the individuals who are responsible for each task.IMS is driven by Mosaiq’s quality checklist (QCL) functionality. Each step in the workflow is initiated by a Mosaiq user sending the responsible party a QCL assignment. IMS is connected to Mosaiq and the sending or completing of a QCL updates the associated field in the TPPM to the appropriate status. Results: Approximately one patient a week is identified during the workflow process as needing to have his/her treatment start date modified or resources re-allocated to address the most urgent cases. Being able to identify a realistic timeline for planning each patient and having multiple departments communicate their limitations and time constraints allows for quality plans to be developed and implemented without overburdening any one department. Conclusion: Monitoring the progression of the treatment planning process has increased transparency between departments, which enables efficient communication. Having built-in timelines allows easy prioritization of tasks and resources and facilitates effective time management.« less

  2. Quality assurance of intensity-modulated radiation therapy.

    PubMed

    Palta, Jatinder R; Liu, Chihray; Li, Jonathan G

    2008-01-01

    The current paradigm for the quality assurance (QA) program for intensity-modulated radiation therapy (IMRT) includes QA of the treatment planning system, QA of the delivery system, and patient-specific QA. Although the IMRT treatment planning and delivery system is the same as for conventional three-dimensional conformal radiation therapy, it has more parameters to coordinate and verify. Because of complex beam intensity modulation, each IMRT field often includes many small irregular off-axis fields, resulting in isodose distributions for each IMRT plan that are more conformal than those from conventional treatment plans. Therefore, these features impose a new and more stringent set of QA requirements for IMRT planning and delivery. The generic test procedures to validate dose calculation and delivery accuracy for both treatment planning and IMRT delivery have to be customized for each type of IMRT planning and delivery strategy. The rationale for such an approach is that the overall accuracy of IMRT delivery is incumbent on the piecewise uncertainties in both the planning and delivery processes. The end user must have well-defined evaluation criteria for each element of the planning and delivery process. Such information can potentially be used to determine a priori the accuracy of IMRT planning and delivery.

  3. Mission activities planning for a Hermes mission by means of AI-technology

    NASA Technical Reports Server (NTRS)

    Pape, U.; Hajen, G.; Schielow, N.; Mitschdoerfer, P.; Allard, F.

    1993-01-01

    Mission Activities Planning is a complex task to be performed by mission control centers. AI technology can offer attractive solutions to the planning problem. This paper presents the use of a new AI-based Mission Planning System for crew activity planning. Based on a HERMES servicing mission to the COLUMBUS Man Tended Free Flyer (MTFF) with complex time and resource constraints, approximately 2000 activities with 50 different resources have been generated, processed, and planned with parametric variation of operationally sensitive parameters. The architecture, as well as the performance of the mission planning system, is discussed. An outlook to future planning scenarios, the requirements, and how a system like MARS can fulfill those requirements is given.

  4. Method and Tool for Design Process Navigation and Automatic Generation of Simulation Models for Manufacturing Systems

    NASA Astrophysics Data System (ADS)

    Nakano, Masaru; Kubota, Fumiko; Inamori, Yutaka; Mitsuyuki, Keiji

    Manufacturing system designers should concentrate on designing and planning manufacturing systems instead of spending their efforts on creating the simulation models to verify the design. This paper proposes a method and its tool to navigate the designers through the engineering process and generate the simulation model automatically from the design results. The design agent also supports collaborative design projects among different companies or divisions with distributed engineering and distributed simulation techniques. The idea was implemented and applied to a factory planning process.

  5. The strategic planning of health management information systems.

    PubMed

    Smith, J

    1995-01-01

    This paper discusses the roles and functions of strategic planning of information systems in health services. It selects four specialised methodologies of strategic planning for analysis with respect to their applicability in the health field. It then examines the utilisation of information planning in case studies of three health organisations (two State departments of health and community services and one acute care institution). Issues arising from the analysis concern the planning process, the use to which plans are put, and implications for management.

  6. Development of an autonomous treatment planning strategy for radiation therapy with effective use of population-based prior data.

    PubMed

    Wang, Huan; Dong, Peng; Liu, Hongcheng; Xing, Lei

    2017-02-01

    Current treatment planning remains a costly and labor intensive procedure and requires multiple trial-and-error adjustments of system parameters such as the weighting factors and prescriptions. The purpose of this work is to develop an autonomous treatment planning strategy with effective use of prior knowledge and in a clinically realistic treatment planning platform to facilitate radiation therapy workflow. Our technique consists of three major components: (i) a clinical treatment planning system (TPS); (ii) a formulation of decision-function constructed using an assemble of prior treatment plans; (iii) a plan evaluator or decision-function and an outer-loop optimization independent of the clinical TPS to assess the TPS-generated plan and to drive the search toward a solution optimizing the decision-function. Microsoft (MS) Visual Studio Coded UI is applied to record some common planner-TPS interactions as subroutines for querying and interacting with the TPS. These subroutines are called back in the outer-loop optimization program to navigate the plan selection process through the solution space iteratively. The utility of the approach is demonstrated by using clinical prostate and head-and-neck cases. An autonomous treatment planning technique with effective use of an assemble of prior treatment plans is developed to automatically maneuver the clinical treatment planning process in the platform of a commercial TPS. The process mimics the decision-making process of a human planner and provides a clinically sensible treatment plan automatically, thus reducing/eliminating the tedious manual trial-and-errors of treatment planning. It is found that the prostate and head-and-neck treatment plans generated using the approach compare favorably with that used for the patients' actual treatments. Clinical inverse treatment planning process can be automated effectively with the guidance of an assemble of prior treatment plans. The approach has the potential to significantly improve the radiation therapy workflow. © 2016 American Association of Physicists in Medicine.

  7. Improving processes through evolutionary optimization.

    PubMed

    Clancy, Thomas R

    2011-09-01

    As systems evolve over time, their natural tendency is to become increasingly more complex. Studies on complex systems have generated new perspectives on management in social organizations such as hospitals. Much of this research appears as a natural extension of the cross-disciplinary field of systems theory. This is the 18th in a series of articles applying complex systems science to the traditional management concepts of planning, organizing, directing, coordinating, and controlling. In this article, I discuss methods to optimize complex healthcare processes through learning, adaptation, and evolutionary planning.

  8. A Generalized Decision Framework Using Multi-objective Optimization for Water Resources Planning

    NASA Astrophysics Data System (ADS)

    Basdekas, L.; Stewart, N.; Triana, E.

    2013-12-01

    Colorado Springs Utilities (CSU) is currently engaged in an Integrated Water Resource Plan (IWRP) to address the complex planning scenarios, across multiple time scales, currently faced by CSU. The modeling framework developed for the IWRP uses a flexible data-centered Decision Support System (DSS) with a MODSIM-based modeling system to represent the operation of the current CSU raw water system coupled with a state-of-the-art multi-objective optimization algorithm. Three basic components are required for the framework, which can be implemented for planning horizons ranging from seasonal to interdecadal. First, a water resources system model is required that is capable of reasonable system simulation to resolve performance metrics at the appropriate temporal and spatial scales of interest. The system model should be an existing simulation model, or one developed during the planning process with stakeholders, so that 'buy-in' has already been achieved. Second, a hydrologic scenario tool(s) capable of generating a range of plausible inflows for the planning period of interest is required. This may include paleo informed or climate change informed sequences. Third, a multi-objective optimization model that can be wrapped around the system simulation model is required. The new generation of multi-objective optimization models do not require parameterization which greatly reduces problem complexity. Bridging the gap between research and practice will be evident as we use a case study from CSU's planning process to demonstrate this framework with specific competing water management objectives. Careful formulation of objective functions, choice of decision variables, and system constraints will be discussed. Rather than treating results as theoretically Pareto optimal in a planning process, we use the powerful multi-objective optimization models as tools to more efficiently and effectively move out of the inferior decision space. The use of this framework will help CSU evaluate tradeoffs in a continually changing world.

  9. Operations Research in a New Spanish Air Force Planning System

    DTIC Science & Technology

    1991-06-01

    Forces around the world can get all or almost all its means through its own national defense industry . Every year countries are reducing their Defense...Development (FSD). 4. Milestone III: Production . 5. Milestone IV: Based on the moedification of an existing weapon system. The process is much more...the USAF planning system defines their requirements at medium and long range, and the national industries follow a process that ends with the

  10. 23 CFR 470.103 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... that the parties involved in carrying out the planning, programming and management systems processes... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH HIGHWAY SYSTEMS Federal-aid Highway Systems § 470.103 Definitions. Except as otherwise provided in this part, terms defined in 23 U.S...

  11. Strategic Information Systems Planning.

    ERIC Educational Resources Information Center

    Rowley, Jennifer

    1995-01-01

    Strategic Information Systems Planning (SISP) is the process of establishing a program for implementation and use of information systems in ways that will optimize effectiveness of information resources and use them to support the objectives of the organization. Basic steps in SISP methodology are outlined. (JKP)

  12. Java RMI Software Technology for the Payload Planning System of the International Space Station

    NASA Technical Reports Server (NTRS)

    Bryant, Barrett R.

    1999-01-01

    The Payload Planning System is for experiment planning on the International Space Station. The planning process has a number of different aspects which need to be stored in a database which is then used to generate reports on the planning process in a variety of formats. This process is currently structured as a 3-tier client/server software architecture comprised of a Java applet at the front end, a Java server in the middle, and an Oracle database in the third tier. This system presently uses CGI, the Common Gateway Interface, to communicate between the user-interface and server tiers and Active Data Objects (ADO) to communicate between the server and database tiers. This project investigated other methods and tools for performing the communications between the three tiers of the current system so that both the system performance and software development time could be improved. We specifically found that for the hardware and software platforms that PPS is required to run on, the best solution is to use Java Remote Method Invocation (RMI) for communication between the client and server and SQLJ (Structured Query Language for Java) for server interaction with the database. Prototype implementations showed that RMI combined with SQLJ significantly improved performance and also greatly facilitated construction of the communication software.

  13. Automated planning for intelligent machines in energy-related applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weisbin, C.R.; de Saussure, G.; Barhen, J.

    1984-01-01

    This paper discusses the current activities of the Center for Engineering Systems Advanced Research (CESAR) program related to plan generation and execution by an intelligent machine. The system architecture for the CESAR mobile robot (named HERMIES-1) is described. The minimal cut-set approach is developed to reduce the tree search time of conventional backward chaining planning techniques. Finally, a real-time concept of an Intelligent Machine Operating System is presented in which planning and reasoning is embedded in a system for resource allocation and process management.

  14. Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Klus, W. J.

    1987-01-01

    The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.

  15. Ventilation planning at Energy West's Deer Creek mine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tonc, L.; Prosser, B.; Gamble, G.

    2009-08-15

    In 2004 ventilation planning was initiated to exploit a remote area of Deer Creek mine's reserve (near Huntington, Utah), the Mill Fork Area, located under a mountain. A push-pull ventilation system was selected. This article details the design process of the ventilation system upgrade, the procurement process for the new fans, and the new fan startup testing. 5 figs., 1 photo.

  16. Towards an Intelligent Planning Knowledge Base Development Environment

    NASA Technical Reports Server (NTRS)

    Chien, S.

    1994-01-01

    ract describes work in developing knowledge base editing and debugging tools for the Multimission VICAR Planner (MVP) system. MVP uses artificial intelligence planning techniques to automatically construct executable complex image processing procedures (using models of the smaller constituent image processing requests made to the JPL Multimission Image Processing Laboratory.

  17. Modernizing the Management of the Educational System. The Fundamentals of Educational Planning: Lecture-Discussion Series No. 35.

    ERIC Educational Resources Information Center

    Lyons, Raymond F.

    One of the main inadequacies in educational management is that planning is not firmly integrated within administration. Five basic processes may be distinguished in administration. The first is planning, or determining what shall be done. The second element of the administrative process is organizing, or defining the administrative structures and…

  18. A Historical Analysis of the Leadership and Strategic Plan of Chancellor Stephen R. Portch in the University System of Georgia

    ERIC Educational Resources Information Center

    Fairchild-Pierce, Jennifer Elis

    2008-01-01

    This dissertation provides historical insight into the design and implementation of one strategic plan of a public higher education system in an effort to inform future similar strategic planning processes. On July 1, 1994, the Board of Regents appointed Stephen R. Portch the ninth Chancellor of the University System of Georgia. The timing was…

  19. Facilitating NASA's Use of GEIA-STD-0005-1, Performance Standard for Aerospace and High Performance Electronic Systems Containing Lead-Free Solder

    NASA Technical Reports Server (NTRS)

    Plante, Jeannete

    2010-01-01

    GEIA-STD-0005-1 defines the objectives of, and requirements for, documenting processes that assure customers and regulatory agencies that AHP electronic systems containing lead-free solder, piece parts, and boards will satisfy the applicable requirements for performance, reliability, airworthiness, safety, and certify-ability throughout the specified life of performance. It communicates requirements for a Lead-Free Control Plan (LFCP) to assist suppliers in the development of their own Plans. The Plan documents the Plan Owner's (supplier's) processes, that assure their customer, and all other stakeholders that the Plan owner's products will continue to meet their requirements. The presentation reviews quality assurance requirements traceability and LFCP template instructions.

  20. Team table: a framework and tool for continuous factory planning

    NASA Astrophysics Data System (ADS)

    Sihn, Wilfried; Bischoff, Juergen; von Briel, Ralf; Josten, Marcus

    2000-10-01

    Growing market turbulences and shorter product life cycles require a continuous adaptation of factory structures resulting in a continuous factory planning process. Therefore a new framework is developed which focuses on configuration and data management process integration. This enable an online system performance evaluation based on continuous availability of current data. The use of this framework is especially helpful and will guarantee high cost and time savings, when used in the early stages of the planning, called the concept or rough planning phase. The new framework is supported by a planning round table as a tool for team-based configuration processes integrating the knowledge of all persons involved in planning processes. A case study conducted at a German company shows the advantages which can be achieved by implementing the new framework and methods.

  1. Intelligent Transportation Systems statewide architecture : final report.

    DOT National Transportation Integrated Search

    2003-06-01

    This report describes the development of Kentuckys Statewide Intelligent Transportation Systems (ITS) Architecture. The process began with the development of an ITS Strategic Plan in 1997-2000. A Business Plan, developed in 2000-2001, translated t...

  2. Application of science-based restoration planning to a desert river system.

    PubMed

    Laub, Brian G; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  3. Application of Science-Based Restoration Planning to a Desert River System

    NASA Astrophysics Data System (ADS)

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  4. Application of science-based restoration planning to a desert river system

    USGS Publications Warehouse

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-01-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  5. Application of Mathematical and Three-Dimensional Computer Modeling Tools in the Planning of Processes of Fuel and Energy Complexes

    NASA Astrophysics Data System (ADS)

    Aksenova, Olesya; Nikolaeva, Evgenia; Cehlár, Michal

    2017-11-01

    This work aims to investigate the effectiveness of mathematical and three-dimensional computer modeling tools in the planning of processes of fuel and energy complexes at the planning and design phase of a thermal power plant (TPP). A solution for purification of gas emissions at the design development phase of waste treatment systems is proposed employing mathematical and three-dimensional computer modeling - using the E-nets apparatus and the development of a 3D model of the future gas emission purification system. Which allows to visualize the designed result, to select and scientifically prove economically feasible technology, as well as to ensure the high environmental and social effect of the developed waste treatment system. The authors present results of a treatment of planned technological processes and the system for purifying gas emissions in terms of E-nets. using mathematical modeling in the Simulink application. What allowed to create a model of a device from the library of standard blocks and to perform calculations. A three-dimensional model of a system for purifying gas emissions has been constructed. It allows to visualize technological processes and compare them with the theoretical calculations at the design phase of a TPP and. if necessary, make adjustments.

  6. Software and Dataware for Energy Generation and Consumption Analysis System of Gas Processing Enterprises

    NASA Astrophysics Data System (ADS)

    Dolotovskii, I. V.; Dolotovskaya, N. V.; Larin, E. A.

    2018-05-01

    The article presents the architecture and content of a specialized analytical system for monitoring operational conditions, planning of consumption and generation of energy resources, long-term planning of production activities and development of a strategy for the development of the energy complex of gas processing enterprises. A compositional model of structured data on the equipment of the main systems of the power complex is proposed. The correctness of the use of software modules and the database of the analytical system is confirmed by comparing the results of measurements on the equipment of the electric power system and simulation at the operating gas processing plant. A high accuracy in the planning of consumption of fuel and energy resources has been achieved (the error does not exceed 1%). Information and program modules of the analytical system allow us to develop a strategy for improving the energy complex in the face of changing technological topology and partial uncertainty of economic factors.

  7. Participatory System Dynamics Modeling: Increasing Stakeholder Engagement and Precision to Improve Implementation Planning in Systems.

    PubMed

    Zimmerman, Lindsey; Lounsbury, David W; Rosen, Craig S; Kimerling, Rachel; Trafton, Jodie A; Lindley, Steven E

    2016-11-01

    Implementation planning typically incorporates stakeholder input. Quality improvement efforts provide data-based feedback regarding progress. Participatory system dynamics modeling (PSD) triangulates stakeholder expertise, data and simulation of implementation plans prior to attempting change. Frontline staff in one VA outpatient mental health system used PSD to examine policy and procedural "mechanisms" they believe underlie local capacity to implement evidence-based psychotherapies (EBPs) for PTSD and depression. We piloted the PSD process, simulating implementation plans to improve EBP reach. Findings indicate PSD is a feasible, useful strategy for building stakeholder consensus, and may save time and effort as compared to trial-and-error EBP implementation planning.

  8. Computer Disaster Recovery Planning.

    ERIC Educational Resources Information Center

    Clark, Orvin R.

    Arguing that complete, reliable, up-to-date system documentation is critical for every data processing environment, this paper on computer disaster recovery planning begins by discussing the importance of such documentation both for recovering from a systems crash, and for system maintenance and enhancement. The various components of system…

  9. An operational information systems architecture for assessing sustainable transportation planning: principles and design.

    PubMed

    Borzacchiello, Maria Teresa; Torrieri, Vincenzo; Nijkamp, Peter

    2009-11-01

    This paper offers the description of an integrated information system framework for the assessment of transportation planning and management. After an introductory exposition, in the first part of the paper, a broad overview of international experiences regarding information systems on transportation is given, focusing in particular on the relationship between transportation system's performance monitoring and the decision-making process, and on the importance of this connection in the evaluation and planning process, in Italian and European cases. Next, the methodological design of an information system to support efficient and sustainable transportation planning and management aiming to integrate inputs from several different data sources is presented. The resulting framework deploys modular and integrated databases which include data stemming from different national or regional data banks and which integrate information belonging to different transportation fields. For this reason, it allows public administrations to account for many strategic elements that influence their decisions regarding transportation, both from a systemic and infrastructural point of view.

  10. SU-F-T-100: Development and Implementation of a Treatment Planning Tracking System Into the Radiation Oncology Clinic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kabat, C; Cline, K; Li, Y

    Purpose: With increasing numbers of cancer patients being diagnosed and the complexity of radiotherapy treatments rising it’s paramount that patient plan development continues to stay fluid within the clinic. In order to maintain a high standard of care and clinical efficiency the establishment of a tracking system for patient plan development allows healthcare providers to view real time plan progression and drive clinical workflow. In addition, it provides statistical datasets which can further identify inefficiencies within the clinic. Methods: An application was developed utilizing Microsoft’s ODBC SQL database engine to track patient plan status throughout the treatment planning process whilemore » also managing key factors pertaining to the patient’s treatment. Pertinent information is accessible to staff in many locations, including tracking monitors within dosimetry, the clinic network for both computers and handheld devices, and through email notifications. Plans are initiated with a CT and continually tracked through planning stages until final approval by staff. Patient’s status is dynamically updated by the physicians, dosimetrists, and medical physicists based on the stage of the patient’s plan. Results: Our application has been running over a six month period with all patients being processed through the system. Modifications have been made to allow for new features to be implemented along with additional tracking parameters. Based on in-house feedback, the application has been supportive in streamlining patient plans through the treatment planning process and data has been accumulating to further improve procedures within the clinic. Conclusion: Over time the clinic will continue to track data with this application. As data accumulates the clinic will be able to highlight inefficiencies within the workflow and adapt accordingly. We will add in new features to help support the treatment planning process in the future.« less

  11. The Planning Wheel: Value Added Performance.

    ERIC Educational Resources Information Center

    Murk, Peter J.; Walls, Jeffrey L.

    The "Planning Wheel" is an evolution of the original Systems Approach Model (SAM) that was introduced in 1986 by Murk and Galbraith. Unlike most current planning models, which are linear in design and concept, the Planning Wheel bridges the gap between linear and nonlinear processes. The "Program Planning Wheel" is designed to…

  12. 42 CFR 431.806 - State plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... processing assessment system. Except in a State that has an approved Medicaid Management Information System... Medicaid quality control claims processing assessment system that meets the requirements of §§ 431.830...

  13. A web-based computer aided system for liver surgery planning: initial implementation on RayPlus

    NASA Astrophysics Data System (ADS)

    Luo, Ming; Yuan, Rong; Sun, Zhi; Li, Tianhong; Xie, Qingguo

    2016-03-01

    At present, computer aided systems for liver surgery design and risk evaluation are widely used in clinical all over the world. However, most systems are local applications that run on high-performance workstations, and the images have to processed offline. Compared with local applications, a web-based system is accessible anywhere and for a range of regardless of relative processing power or operating system. RayPlus (http://rayplus.life.hust.edu.cn), a B/S platform for medical image processing, was developed to give a jump start on web-based medical image processing. In this paper, we implement a computer aided system for liver surgery planning on the architecture of RayPlus. The system consists of a series of processing to CT images including filtering, segmentation, visualization and analyzing. Each processing is packaged into an executable program and runs on the server side. CT images in DICOM format are processed step by to interactive modeling on browser with zero-installation and server-side computing. The system supports users to semi-automatically segment the liver, intrahepatic vessel and tumor from the pre-processed images. Then, surface and volume models are built to analyze the vessel structure and the relative position between adjacent organs. The results show that the initial implementation meets satisfactorily its first-order objectives and provide an accurate 3D delineation of the liver anatomy. Vessel labeling and resection simulation are planned to add in the future. The system is available on Internet at the link mentioned above and an open username for testing is offered.

  14. Global positioning systems for personal travel surveys : Lexington area travel data collection test

    DOT National Transportation Integrated Search

    1986-12-01

    The urban transportation planning process is undergoing critical transformations. Of particular interest is the emergence of private sector involvement in the planning, management, financing, construction of transportation systems and provision of tr...

  15. 11. Strategic planning.

    PubMed

    2014-05-01

    There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.

  16. Case study in health information management: strategic planning.

    PubMed

    Homan, C V

    1992-08-01

    The strategic planning process has proven to be invaluable to Riverside Hospital's success. Involvement of all levels of the organization and integration of plans solidifies organizational commitments and provides a framework that assures accomplishment of overall goals. With major developments in computerization of medical records and other systems that support patient care data analysis on the horizon, Riverside's integrated plans are defining crucial information system projects. As the pool of available resources for projects continues to shrink, the planning format described assures funding of information system needs that will secure a position for Riverside in the health care marketplace of the future.

  17. Implementing Information Assurance - Beyond Process

    DTIC Science & Technology

    2009-01-01

    disabled or properly configured. Tools and scripts are available to expedite the configuration process on some platforms, For example, approved Windows...in the System Security Plan (SSP) or Information Security Plan (lSP). Any PPSs not required for operation by the system must be disabled , This...Services must be disabled , Implementing an 1M capability within the boundary carries many policy and documentation requirements. Usemame and passwords

  18. The development of a recreational land classification system

    Treesearch

    Robert W. Reinhardt; Diana Gould

    1995-01-01

    The New York State Office of Parks, Recreation, and Historic Preservation has had a land classification system in place since 1972. This system was developed during the creation of the first Statewide Comprehensive Outdoor Recreation Plan. This system has become the backbone of the Park Master Planning Process. During the past few years the New York State Park System...

  19. Computers and Information Systems in Planning and Related Governmental Functions.

    ERIC Educational Resources Information Center

    Tucker, Dorothy; Vance, Mary, Ed.

    The 266 items cited include material published since July 1960, organized in the following ten groups: (1) general discussion, and feasibility; (2) statewide electronic data processing (EDP) systems; (3) EDP in local governments; (4) intergovernmental EDP systems; (5) EDP in the planning agency; (6) data banks and information systems; (7) computer…

  20. A Comprehensive Participative Planning Model for Small Liberal Arts Colleges: Morrison, Renfro, and Boucher Meet Madan Capoor. AIR 1992 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Popovics, Alexander J.; Jonas, Peter M.

    This paper describes the use of a comprehensive participative planning model for colleges and universities that includes processes of environmental scanning, proposed by J. Morrison and others, and key elements of the Objective-Based Assessment, Planning, and Resource Allocation System (OAPRAS) proposed by M. Capoor. The process is explained…

  1. Mission Operations of the Mars Exploration Rovers

    NASA Technical Reports Server (NTRS)

    Bass, Deborah; Lauback, Sharon; Mishkin, Andrew; Limonadi, Daniel

    2007-01-01

    A document describes a system of processes involved in planning, commanding, and monitoring operations of the rovers Spirit and Opportunity of the Mars Exploration Rover mission. The system is designed to minimize command turnaround time, given that inherent uncertainties in terrain conditions and in successful completion of planned landed spacecraft motions preclude planning of some spacecraft activities until the results of prior activities are known by the ground-based operations team. The processes are partitioned into those (designated as tactical) that must be tied to the Martian clock and those (designated strategic) that can, without loss, be completed in a more leisurely fashion. The tactical processes include assessment of downlinked data, refinement and validation of activity plans, sequencing of commands, and integration and validation of sequences. Strategic processes include communications planning and generation of long-term activity plans. The primary benefit of this partition is to enable the tactical portion of the team to focus solely on tasks that contribute directly to meeting the deadlines for commanding the rover s each sol (1 sol = 1 Martian day) - achieving a turnaround time of 18 hours or less, while facilitating strategic team interactions with other organizations that do not work on a Mars time schedule.

  2. Outcome-Based School-to-Work Transition Planning for Students with Severe Disabilities.

    ERIC Educational Resources Information Center

    Steere, Daniel E.; And Others

    1990-01-01

    A transition planning process that focuses on quality-of-life outcomes is presented. The process, which views employment not as an outcome but as a vehicle for the attainment of quality of life, involves six steps: orientation, personal profile development, identification of employment outcomes, measurement system, compatibility process, and…

  3. Planning for Reduction in Force in Institutions of Higher Education.

    ERIC Educational Resources Information Center

    Westerman, Melvin Elliott

    A description of reduction in force (RIF) planning as undertaken by Pennsylvania State University is presented. It is suggested that because a university is a system, adjustments to personnel functions must follow systemic rationale to be successful. It is proposed that RIF olanning is a personnel planning process that can be evaluated by using…

  4. Plan for a Statewide On-Line Information System for Libraries (MnLINK).

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Education, St. Paul.

    The 1996 Legislature directed the Minnesota Higher Education Services Office (HESO), in cooperation with the Library Planning Task Force to, "create a plan and process to develop a statewide on-line information system for libraries"; this memo with attached information was submitted in fulfillment of that request. The name chosen for the…

  5. Post-test navigation data analysis techniques for the shuttle ALT

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Postflight test analysis data processing techniques for shuttle approach and landing tests (ALT) navigation data are defined. Postfight test processor requirements are described along with operational and design requirements, data input requirements, and software test requirements. The postflight test data processing is described based on the natural test sequence: quick-look analysis, postflight navigation processing, and error isolation processing. Emphasis is placed on the tradeoffs that must remain open and subject to analysis until final definition is achieved in the shuttle data processing system and the overall ALT plan. A development plan for the implementation of the ALT postflight test navigation data processing system is presented. Conclusions are presented.

  6. Information for Institutional Renewal.

    ERIC Educational Resources Information Center

    Spencer, Richard L.

    1979-01-01

    Discusses a planning, management, and evaluation system, an objective-based planning process, research databases, analytical reports, and transactional data as state-of-the-art tools available to generate data which link research directly to planning for institutional renewal. (RC)

  7. ITS strategic deployment plan : executive summary

    DOT National Transportation Integrated Search

    1997-02-27

    The Salt Lake Valley ITS Early Deployment Planning Study-Phase II prepared the framework to deploy candidate Intelligent Transportation System (ITS) projects that address Salt Lake Valleys transportation needs. A planning process was used that inc...

  8. Integrating Personalized and Community Services for Mobile Travel Planning and Management

    NASA Astrophysics Data System (ADS)

    Yu, Chien-Chih

    Personalized and community services have been noted as keys to enhance and facilitate e-tourism as well as mobile applications. This paper aims at proposing an integrated service framework for combining personalized and community functions to support mobile travel planning and management. Major mobile tourism related planning and decision support functions specified include personalized profile management, information search and notification, evaluation and recommendation, do-it-yourself planning and design, community and collaboration management, auction and negotiation, transaction and payment, as well as trip tracking and quality control. A system implementation process with an example prototype is also presented for illustrating the feasibility and effectiveness of the proposed system framework, process model, and development methodology.

  9. Healthcare Strategic Planning as Part of National and Regional Development in the Israeli Galilee: A Case Study of the Planning Process.

    PubMed

    Peled, Ronit; Schenirer, Jerry

    2009-10-01

    This article describes a systematic process of geographic and strategic planning for healthcare services as a part of a regional development plan in the Israeli Galilee. The planning process consisted of three stages: (a) assessment of needs, demand and existing resources; (b) prioritisation of initiatives; and (c) scheduling of theoretical priorities. For many years the region has suffered from inequities and inequalities regarding the availability and accessibility of a regional healthcare system, resulting in high mortality and morbidity rates and low quality of life. The aim of the healthcare strategic plan was to suggest initiatives and actions to be taken in order to improve healthcare provision and the health and wellbeing of local residents.

  10. Multigeneration data migration from legacy systems

    NASA Astrophysics Data System (ADS)

    Ratib, Osman M.; Liu, Brent J.; Kho, Hwa T.; Tao, Wenchao; Wang, Cun; McCoy, J. Michael

    2003-05-01

    The migration of image data from different generations of legacy archive systems represents a technical challenge and in incremental cost in transitions to newer generations of PACS. UCLA medical center has elected to completely replace the existing PACS infrastructure encompassing several generations of legacy systems by a new commercial system providing enterprise-wide image management and communication. One of the most challenging parts of the project was the migration of large volumes of legacy images into the new system. Planning of the migration required the development of specialized software and hardware, and included different phases of data mediation from existing databases to the new PACS database prior to the migration of the image data. The project plan included a detailed analysis of resources and cost of data migration to optimize the process and minimize the delay of a hybrid operation where the legacy systems need to remain operational. Our analysis and project planning showed that the data migration represents the most critical path in the process of PACS renewal. Careful planning and optimization of the project timeline and resources allocated is critical to minimize the financial impact and the time delays that such migrations can impose on the implementation plan.

  11. Strategic Planning, 2000-2005.

    ERIC Educational Resources Information Center

    Tennessee State Board of Regents, Nashville.

    This report presents cycle four of the strategic planning process at the State University and Community College System of Tennessee. The cycle extends for five fiscal years from 2000 to 2005, and is meant to: (1) provide a blueprint of the systems vision; (2) provide guidelines to facilitate setting system policy and priorities; (3) provide…

  12. Advancing the integration of hospital IT. Pitfalls and perspectives when replacing specialized software for high-risk environments with enterprise system extensions.

    PubMed

    Engelmann, Carsten; Ametowobla, Dzifa

    2017-05-17

    Planning and controlling surgical operations hugely impacts upon productivity, patient safety, and surgeons' careers. Established, specialized software for this task is being increasingly replaced by "Operating Room (OR)-modules" appended to enterprise-wide resource planning (ERP) systems. As a result, usability problems are re-emerging and require developers' attention. Systematic evaluation of the functionality and social repercussions of a global, market-leading IT business control system (SAP R3, Germany), adapted for real-time OR process steering. Field study involving document analyses, interviews, and a 73-item survey addressed to 77 qualified (> 1-year system experience) senior planning executives (end users; "planners") working in surgical departments of university hospitals. Planners reported that 57% of electronic operation requests contained contradictory information. Key screens contained clinically irrelevant areas (36 +/- 29%). Compared to the legacy system, users reported either no improvements or worse performance, in regard to co-ordination of OR stakeholders, intra-day program changes, and safety. Planners concluded that the ERP-planning module was "non-intuitive" (66%), increased planning work (56%, p=0.002), and did not impact upon either organizational mishap spectrum or frequency. Interviews evidenced intra-institutional power shifts due to increased system complexity. Planners resented e.g. a trend towards increased personal culpability for mishap. Highly complex enterprise system extensions may not be directly suited to specific process steering tasks in a high risk/low error-environment like the OR. In view of surgeons' high primary task load, the repeated call for simpler IT is an imperative for ERP extensions. System design should consider a) that current OR IT suffers from an input limitation regarding planning-relevant real-time data, and b) that there are social processes that strongly affect planning and particularly ERP use beyond algorithms. Real improvement of clinical IT tools requires their independent evaluation according to standards developed for pharmaceutical subjects.

  13. The General Mission Analysis Tool (GMAT) System Test Plan

    NASA Technical Reports Server (NTRS)

    Conway, Darrel J.; Hughes, Steven P.

    2007-01-01

    This document serves as the System Test Approach for the GMAT Project. Preparation for system testing consists of three major stages: 1) The Test Approach sets the scope of system testing, the overall strategy to be adopted, the activities to be completed, the general resources required and the methods and processes to be used to test the release. It also details the activities, dependencies and effort required to conduct the System Test. 2) Test Planning details the activities, dependencies and effort required to conduct the System Test. 3) Test Cases documents the tests to be applied, the data to be processed, the automated testing coverage and the expected results. This document covers the first two of these items, and established the framework used for the GMAT test case development. The test cases themselves exist as separate components, and are managed outside of and concurrently with this System Test Plan.

  14. Application of a computerized environmental information system to master and sector planning

    NASA Technical Reports Server (NTRS)

    Stewart, J. C.

    1978-01-01

    A computerized composite mapping system developed as an aid in the land use decision making process is described. Emphasis is placed on consideration of the environment in urban planning. The presence of alluvium, shallow bedrock, surface water, and vegetation growth are among the environmental factors considered. An analysis of the Shady Grove Sector planning is presented as an example of the use of computerized composite mapping for long range planning.

  15. Pacific Northwest National Laboratory institutional plan: FY 1996--2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-01-01

    This report contains the operation and direction plan for the Pacific Northwest National Laboratory of the US Department of Energy. The topics of the plan include the laboratory mission and core competencies, the laboratory strategic plan; the laboratory initiatives in molecular sciences, microbial biotechnology, global environmental change, complex modeling of physical systems, advanced processing technology, energy technology development, and medical technologies and systems; core business areas, critical success factors, and resource projections.

  16. Autonomous Robot Navigation in Human-Centered Environments Based on 3D Data Fusion

    NASA Astrophysics Data System (ADS)

    Steinhaus, Peter; Strand, Marcus; Dillmann, Rüdiger

    2007-12-01

    Efficient navigation of mobile platforms in dynamic human-centered environments is still an open research topic. We have already proposed an architecture (MEPHISTO) for a navigation system that is able to fulfill the main requirements of efficient navigation: fast and reliable sensor processing, extensive global world modeling, and distributed path planning. Our architecture uses a distributed system of sensor processing, world modeling, and path planning units. In this arcticle, we present implemented methods in the context of data fusion algorithms for 3D world modeling and real-time path planning. We also show results of the prototypic application of the system at the museum ZKM (center for art and media) in Karlsruhe.

  17. Planning for the semiconductor manufacturer of the future

    NASA Technical Reports Server (NTRS)

    Fargher, Hugh E.; Smith, Richard A.

    1992-01-01

    Texas Instruments (TI) is currently contracted by the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST, including the following: new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication. TI was awarded the contract in Oct., 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include the following: process control for dynamic control of factory processes; modular processing system for controlling the processing equipment; generic equipment model which provides an interface between processing equipment and the rest of the factory; specification system which maintains factory documents and product specifications; simulator for modelling the factory for analysis purposes; scheduler for scheduling work on the factory floor; and the planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the planner, scheduler, and simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.

  18. Insights into the government's role in food system policy making: improving access to healthy, local food alongside other priorities.

    PubMed

    Wegener, Jessica; Raine, Kim D; Hanning, Rhona M

    2012-11-12

    Government actors have an important role to play in creating healthy public policies and supportive environments to facilitate access to safe, affordable, nutritious food. The purpose of this research was to examine Waterloo Region (Ontario, Canada) as a case study for "what works" with respect to facilitating access to healthy, local food through regional food system policy making. Policy and planning approaches were explored through multi-sectoral perspectives of: (a) the development and adoption of food policies as part of the comprehensive planning process; (b) barriers to food system planning; and (c) the role and motivation of the Region's public health and planning departments in food system policy making. Forty-seven in-depth interviews with decision makers, experts in public health and planning, and local food system stakeholders provided rich insight into strategic government actions, as well as the local and historical context within which food system policies were developed. Grounded theory methods were used to identify key overarching themes including: "strategic positioning", "partnerships" and "knowledge transfer" and related sub-themes ("aligned agendas", "issue framing", "visioning" and "legitimacy"). A conceptual framework to illustrate the process and features of food system policy making is presented and can be used as a starting point to  engage multi-sectoral stakeholders in plans and actions to facilitate access to healthy food.

  19. Designing automatic resupply systems.

    PubMed

    Harding, M L

    1999-02-01

    This article outlines the process for designing and implementing autoresupply systems. The planning process includes determination of goals and appropriate participation. Different types of autoresupply mechanisms include kanban, breadman, consignment, systems contracts, and direct shipping from an MRP schedule.

  20. Assessing the Performance of Human-Automation Collaborative Planning Systems

    DTIC Science & Technology

    2011-06-01

    process- ing and incorporating vast amounts of incoming information into their solutions. How- ever, these algorithms are brittle and unable to account for...planning system, a descriptive Mission Performance measure may address the total travel time on the path or the cost of the path (e.g. total work...minimizing costs or collisions [4, 32, 33]. Error measures for such a path planning system may track how many collisions occur or how much threat

  1. Delaware Valley Regional Planning Commission Philadelphia Metropolitan Region : planning for congestion

    DOT National Transportation Integrated Search

    2009-04-01

    The Delaware Valley Regional Planning Commission uses a systematic process for managing traffic congestion and monitoring transportation system performance in the Philadelphia metropolitan region. Guided by an advisory team of stakeholders, the agenc...

  2. PM2006: a highly scalable urban planning management information system--Case study: Suzhou Urban Planning Bureau

    NASA Astrophysics Data System (ADS)

    Jing, Changfeng; Liang, Song; Ruan, Yong; Huang, Jie

    2008-10-01

    During the urbanization process, when facing complex requirements of city development, ever-growing urban data, rapid development of planning business and increasing planning complexity, a scalable, extensible urban planning management information system is needed urgently. PM2006 is such a system that can deal with these problems. In response to the status and problems in urban planning, the scalability and extensibility of PM2006 are introduced which can be seen as business-oriented workflow extensibility, scalability of DLL-based architecture, flexibility on platforms of GIS and database, scalability of data updating and maintenance and so on. It is verified that PM2006 system has good extensibility and scalability which can meet the requirements of all levels of administrative divisions and can adapt to ever-growing changes in urban planning business. At the end of this paper, the application of PM2006 in Urban Planning Bureau of Suzhou city is described.

  3. 3D treatment planning systems.

    PubMed

    Saw, Cheng B; Li, Sicong

    2018-01-01

    Three-dimensional (3D) treatment planning systems have evolved and become crucial components of modern radiation therapy. The systems are computer-aided designing or planning softwares that speed up the treatment planning processes to arrive at the best dose plans for the patients undergoing radiation therapy. Furthermore, the systems provide new technology to solve problems that would not have been considered without the use of computers such as conformal radiation therapy (CRT), intensity-modulated radiation therapy (IMRT), and volumetric modulated arc therapy (VMAT). The 3D treatment planning systems vary amongst the vendors and also the dose delivery systems they are designed to support. As such these systems have different planning tools to generate the treatment plans and convert the treatment plans into executable instructions that can be implemented by the dose delivery systems. The rapid advancements in computer technology and accelerators have facilitated constant upgrades and the introduction of different and unique dose delivery systems than the traditional C-arm type medical linear accelerators. The focus of this special issue is to gather relevant 3D treatment planning systems for the radiation oncology community to keep abreast of technology advancement by assess the planning tools available as well as those unique "tricks or tips" used to support the different dose delivery systems. Copyright © 2018 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.

  4. Begin the Between: Planning for the Transition from High School to Adult Life for Youth with Developmental Disabilities. Second Edition.

    ERIC Educational Resources Information Center

    Matuszak, Trish; And Others

    This guide was developed to provide an overview of the major elements of the transition planning process from school to the adult system of supports and services for youth with developmental disabilities and their families. The workbook format is intended to enable families to be proactive at each stage of the planning process. Initial sections…

  5. Care plans and care planning in long-term conditions: a conceptual model.

    PubMed

    Burt, Jenni; Rick, Jo; Blakeman, Thomas; Protheroe, Joanne; Roland, Martin; Bower, Pete

    2014-10-01

    The prevalence and impact of long-term conditions continues to rise. Care planning for people with long-term conditions has been a policy priority for chronic disease management in a number of health-care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between 'care planning' (the process by which health-care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a 'care plan' (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health-care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans.

  6. Organisational development in general practice: lessons from practice and professional development plans (PPDPs)

    PubMed Central

    Elwyn, Glyn; Hocking, Paul

    2000-01-01

    Background Improving the quality and effectiveness of clinical practice is becoming a key task within all health services. Primary medical care, as organised in the UK is composed of clinicians who work in independent partnerships (general practices) that collaborate with other health care professionals. Although many practices have successfully introduced innovations, there are no organisational development structures in place that support the evolution of primary medical care towards integrated care processes. Providing incentives for attendance at passive educational events and promoting 'teamwork' without first identifying organisational priorities are interventions that have proved to be ineffective at changing clinical processes. A practice and professional development plan feasibility study was evaluated in Wales and provided the experiential basis for a summary of the lessons learnt on how best to guide organisational development systems for primary medical care. Results Practice and professional development plans are hybrids produced by the combination of ideas from management (the applied behavioural science of organisational development) and education (self-directed adult learning theories) and, in conceptual terms, address the lack of effectiveness of passive educational strategies by making interventions relevant to identified system wide needs. In the intervention, each practice participated in a series of multidisciplinary workshops (minimum 4) where the process outcome was the production of a practice development plan and a set of personal portfolios, and the final outcome was a realised organisational change. It was apparent during the project that organisational admission to a process of developmental planning needed to be a stepwise process, where initial interest can lead to a fuller understanding, which subsequently develops into motivation and ownership, sufficient to complete the exercise. The advantages of introducing expert external facilitation were clear: evaluations of internal group processes were possible, strategic issues could be raised and explored and financial probity ensured. These areas are much more difficult to examine when only internal stakeholders are engaged in a planning process. Conclusions It is not possible to introduce practice and professional development plans (organisational development and organisational learning projects) in a publicly funded health care system without first addressing existing educational and management structures. Existing systems are based on educational credits for attendance and emerging accountability frameworks (criteria checklists) for clinical governance. Moving to systems that are less summative and more formative, and based on the philosophies of continual quality improvement, require changes to be made in the relevant support systems in order achieve policy proposals. PMID:11178111

  7. Toward a space materials systems program

    NASA Technical Reports Server (NTRS)

    Vontiesenhausen, G. F.

    1981-01-01

    A program implementation model is presented which covers the early stages of space material processing and manufacturing. The model includes descriptions of major program elements, development and experiment requirements in space materials processing and manufacturing, and an integration of the model into NASA's long range plans as well as its evolution from present Materials Processing in Space plans.

  8. STS/Spacelab payload utilization planning study: Executive summary

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The planning process recommended to meet the orbital flight requirements for the Space Transportation System and payload development, procurement, operations, and support leading to authorization and funding of STS and payload project activities is described. The rationale and rp primary products of STS utilization planning are summarized along with the implementation of the system. Major recommendations of the study are included.

  9. Optimal allocation model of construction land based on two-level system optimization theory

    NASA Astrophysics Data System (ADS)

    Liu, Min; Liu, Yanfang; Xia, Yuping; Lei, Qihong

    2007-06-01

    The allocation of construction land is an important task in land-use planning. Whether implementation of planning decisions is a success or not, usually depends on a reasonable and scientific distribution method. Considering the constitution of land-use planning system and planning process in China, multiple levels and multiple objective decision problems is its essence. Also, planning quantity decomposition is a two-level system optimization problem and an optimal resource allocation decision problem between a decision-maker in the topper and a number of parallel decision-makers in the lower. According the characteristics of the decision-making process of two-level decision-making system, this paper develops an optimal allocation model of construction land based on two-level linear planning. In order to verify the rationality and the validity of our model, Baoan district of Shenzhen City has been taken as a test case. Under the assistance of the allocation model, construction land is allocated to ten townships of Baoan district. The result obtained from our model is compared to that of traditional method, and results show that our model is reasonable and usable. In the end, the paper points out the shortcomings of the model and further research directions.

  10. A framework for planning of sustainable water and sanitation systems in peri-urban areas.

    PubMed

    Törnqvist, R; Norström, A; Kärrman, E; Malmqvist, P-A

    2008-01-01

    There are billions of people around the world that lack access to safe water supply and basic sanitation, a situation which puts the affected in severe health conditions as well as economical and social despair. Many of those lacking adequate water supply and sanitation systems can be found at the fringe of the cities in so called peri-urban areas, especially in the developing world. Planning in these areas is highly complex due to challenging environmental and physical conditions, high population density and unclear institutional boundaries. This article presents a framework aiming to support the planning process for sustainable water and sanitation systems in peri-urban areas. The suggested framework is based on different available planning approaches from a review of literature and websites of organisations and companies. It consists of a recommendation of important steps in the planning process as well as supporting tools. Further, it incorporates a set of sustainability criteria important for the peri-urban context and allows for the development of site specific systems. The framework has the aim to be flexible for different planning situations, and for suiting planners with different perspectives and amount of resources. (c) IWA Publishing 2008.

  11. Information systems for the materials management department: stand-alone and enterprise resource planning systems.

    PubMed

    2005-03-01

    Materials management information systems (MMISs) incorporate information tools that hospitals can use to automate certain business processes, increase staff compliance with these processes, and identify opportunities for cost savings. Recently, there has been a push by hospital administration to purchase enterprise resource planning (ERP) systems, information systems that promise to integrate many more facets of healthcare business. We offer this article to help materials managers, administrators, and others involved with information system selection understand the changes that have taken place in materials management information systems, decide whether they need a new system and, if so, whether a stand-alone MMIS or an ERP system will be the best choice.

  12. Options for Parallelizing a Planning and Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Estlin, Tara A.; Bornstein, Benjamin D.

    2011-01-01

    Space missions have a growing interest in putting multi-core processors onboard spacecraft. For many missions processing power significantly slows operations. We investigate how continual planning and scheduling algorithms can exploit multi-core processing and outline different potential design decisions for a parallelized planning architecture. This organization of choices and challenges helps us with an initial design for parallelizing the CASPER planning system for a mesh multi-core processor. This work extends that presented at another workshop with some preliminary results.

  13. Maintaining consistency between planning hierarchies: Techniques and applications

    NASA Technical Reports Server (NTRS)

    Zoch, David R.

    1987-01-01

    In many planning and scheduling environments, it is desirable to be able to view and manipulate plans at different levels of abstraction, allowing the users the option of viewing and manipulating either a very detailed representation of the plan or a high-level more abstract version of the plan. Generating a detailed plan from a more abstract plan requires domain-specific planning/scheduling knowledge; the reverse process of generating a high-level plan from a detailed plan Reverse Plan Maintenance, or RPM) requires having the system remember the actions it took based on its domain-specific knowledge and its reasons for taking those actions. This reverse plan maintenance process is described as implemented in a specific planning and scheduling tool, The Mission Operations Planning Assistant (MOPA), as well as the applications of RPM to other planning and scheduling problems; emphasizing the knowledge that is needed to maintain the correspondence between the different hierarchical planning levels.

  14. 49 CFR 232.503 - Process to introduce new brake system technology.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Process to introduce new brake system technology... Technology § 232.503 Process to introduce new brake system technology. (a) Pursuant to the procedures... brake system technology, prior to implementing the plan. (b) Each railroad shall complete a pre-revenue...

  15. 49 CFR 232.503 - Process to introduce new brake system technology.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Process to introduce new brake system technology... Technology § 232.503 Process to introduce new brake system technology. (a) Pursuant to the procedures... brake system technology, prior to implementing the plan. (b) Each railroad shall complete a pre-revenue...

  16. 49 CFR 232.503 - Process to introduce new brake system technology.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Process to introduce new brake system technology... Technology § 232.503 Process to introduce new brake system technology. (a) Pursuant to the procedures... brake system technology, prior to implementing the plan. (b) Each railroad shall complete a pre-revenue...

  17. 49 CFR 232.503 - Process to introduce new brake system technology.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Process to introduce new brake system technology... Technology § 232.503 Process to introduce new brake system technology. (a) Pursuant to the procedures... brake system technology, prior to implementing the plan. (b) Each railroad shall complete a pre-revenue...

  18. 49 CFR 232.503 - Process to introduce new brake system technology.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Process to introduce new brake system technology... Technology § 232.503 Process to introduce new brake system technology. (a) Pursuant to the procedures... brake system technology, prior to implementing the plan. (b) Each railroad shall complete a pre-revenue...

  19. Efficiency improvements of offline metrology job creation

    NASA Astrophysics Data System (ADS)

    Zuniga, Victor J.; Carlson, Alan; Podlesny, John C.; Knutrud, Paul C.

    1999-06-01

    Progress of the first lot of a new design through the production line is watched very closely. All performance metrics, cycle-time, in-line measurement results and final electrical performance are critical. Rapid movement of this lot through the line has serious time-to-market implications. Having this material waiting at a metrology operation for an engineer to create a measurement job plan wastes valuable turnaround time. Further, efficient use of a metrology system is compromised by the time required to create and maintain these measurement job plans. Thus, having a method to develop metrology job plans prior to the actual running of the material through the manufacture area can significantly improve both cycle time and overall equipment efficiency. Motorola and Schlumberger have worked together to develop and test such a system. The Remote Job Generator (RJG) created job plans for new device sin a manufacturing process from an NT host or workstation, offline. This increases available system tim effort making production measurements, decreases turnaround time on job plan creation and editing, and improves consistency across job plans. Most importantly this allows job plans for new devices to be available before the first wafers of the device arrive at the tool for measurement. The software also includes a database manager which allows updates of existing job plans to incorporate measurement changes required by process changes or measurement optimization. This paper will review the result of productivity enhancements through the increased metrology utilization and decreased cycle time associated with the use of RJG. Finally, improvements in process control through better control of Job Plans across different devices and layers will be discussed.

  20. SU-F-T-304: Complex Multi-PTV Treatment Evaluation Using a Remotely Processed 3D Gel Dosimeter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoisak, J; Dragojevic, I; Sutlief, S

    Purpose: A new 3D gel dosimeter (ClearView™, Modus Medical Systems) was investigated for use as a QA tool for stereotactic radiosurgery (SRS) plans exhibiting high dose gradients and spatially separated treatment targets. The unique feature of this gel dosimeter is the remote processing service provided by Modus Medical Systems. Methods: The gel dosimeters were filled in either 10 cm diameter or 15 cm diameter clear plastic jars. The jars were then shipped in ice-cooled containers to our department for irradiation. Clinical SRS plans for treatment of multiple metastases and plans with simulated concave structures were applied to a CT scanmore » of the gel dosimeter. The gel was irradiated in treatment position using modulated arcs and then returned in the cooled container for processing. The 3D gel dose was compared to the DICOM-RT dose from the treatment plan to assess dosimetric and geometric agreement. Results: There was no discernible difference between the planned and measured dose for dose gradients as high as 10%/mm, which was the highest gradient we evaluated. Geometric agreement for distant metastases separated by 6 cm was within 1.5 mm. Among three identically irradiated gels using a plan intended for nine metastases, the 3%/3mm gamma passing rate was 84.5% with a range of 14.7%, measured over the entire volume of the dosimeter. Regions of larger gamma values correlated with geometric offsets between the planned and measured data. Conclusion: The gel dosimeter exhibits the dosimetric and geometric characteristics necessary for 3D evaluation of treatment plan deliverability. The range of observed gamma passing rates suggests a high sensitivity to geometric registration. With proper management of geometric registration between planned and measured data, this service should enable a radiation oncology department to use 3D dosimetry in end-to-end testing or patient plan delivery QA without the expense of an in-house processing system.« less

  1. CPAS Preflight Drop Test Analysis Process

    NASA Technical Reports Server (NTRS)

    Englert, Megan E.; Bledsoe, Kristin J.; Romero, Leah M.

    2015-01-01

    Throughout the Capsule Parachute Assembly System (CPAS) drop test program, the CPAS Analysis Team has developed a simulation and analysis process to support drop test planning and execution. This process includes multiple phases focused on developing test simulations and communicating results to all groups involved in the drop test. CPAS Engineering Development Unit (EDU) series drop test planning begins with the development of a basic operational concept for each test. Trajectory simulation tools include the Flight Analysis and Simulation Tool (FAST) for single bodies, and the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) simulation for the mated vehicle. Results are communicated to the team at the Test Configuration Review (TCR) and Test Readiness Review (TRR), as well as at Analysis Integrated Product Team (IPT) meetings in earlier and intermediate phases of the pre-test planning. The ability to plan and communicate efficiently with rapidly changing objectives and tight schedule constraints is a necessity for safe and successful drop tests.

  2. Expert mission planning and replanning scheduling system for NASA KSC payload operations

    NASA Technical Reports Server (NTRS)

    Pierce, Roger

    1987-01-01

    EMPRESS (Expert Mission Planning and REplanning Scheduling System) is an expert system created to assist payload mission planners at Kennedy in the long range planning and scheduling of horizontal payloads for space shuttle flights. Using the current flight manifest, these planners develop mission and payload schedules detailing all processing to be performed in the Operations and Checkout building at Kennedy. With the EMPRESS system, schedules are generated quickly using standard flows that represent the tasks and resources required to process a specific horizontal carrier. Resources can be tracked and resource conflicts can be determined and resolved interactively. Constraint relationships between tasks are maintained and can be enforced when a task is moved or rescheduled. The domain, structure, and functionality of the EMPRESS system is briefly designed. The limitations of the EMPRESS system are described as well as improvements expected with the EMPRESS-2 development.

  3. Automated synthesis of image processing procedures using AI planning techniques

    NASA Technical Reports Server (NTRS)

    Chien, Steve; Mortensen, Helen

    1994-01-01

    This paper describes the Multimission VICAR (Video Image Communication and Retrieval) Planner (MVP) (Chien 1994) system, which uses artificial intelligence planning techniques (Iwasaki & Friedland, 1985, Pemberthy & Weld, 1992, Stefik, 1981) to automatically construct executable complex image processing procedures (using models of the smaller constituent image processing subprograms) in response to image processing requests made to the JPL Multimission Image Processing Laboratory (MIPL). The MVP system allows the user to specify the image processing requirements in terms of the various types of correction required. Given this information, MVP derives unspecified required processing steps and determines appropriate image processing programs and parameters to achieve the specified image processing goals. This information is output as an executable image processing program which can then be executed to fill the processing request.

  4. GCC Master Plan, 1988-89.

    ERIC Educational Resources Information Center

    Germanna Community Coll., Locust Grove, VA.

    In 1989, Germanna Community College (GCC) developed this comprehensive master plan to strengthen its planning process. Part I provides an overview of the development of the master plan, the mission statement of the Virginia Community College System (VCCS), and the mission and purpose statements of GCC. Part II summarizes demographic trends based…

  5. Advancing metropolitan planning for operations : an objectives-driven, performance-based approach : a guidebook

    DOT National Transportation Integrated Search

    2010-02-01

    This guidebook presents an approach for integrating management and operations (M&O) strategies into the metropolitan transportation planning process that is designed to maximize the performance of the existing and planned transportation system. This ...

  6. Scenario Planning: A Phenomenological Examination of Influence on Organizational Learning and Decision-Making in a K-12 Public Education System

    ERIC Educational Resources Information Center

    Deklotz, Patricia F.

    2013-01-01

    Organizations commonly engage in long range planning to direct decisions. Scenario planning, one method of private sector planning, is recognized as useful when organizations are facing uncertainty. Scenario planning engages the organization in a process that produces plausible stories, called scenarios, describing the organization in several…

  7. System-level planning, coordination, and communication: care of the critically ill and injured during pandemics and disasters: CHEST consensus statement.

    PubMed

    Dichter, Jeffrey R; Kanter, Robert K; Dries, David; Luyckx, Valerie; Lim, Matthew L; Wilgis, John; Anderson, Michael R; Sarani, Babak; Hupert, Nathaniel; Mutter, Ryan; Devereaux, Asha V; Christian, Michael D; Kissoon, Niranjan

    2014-10-01

    System-level planning involves uniting hospitals and health systems, local/regional government agencies, emergency medical services, and other health-care entities involved in coordinating and enabling care in a major disaster. We reviewed the literature and sought expert opinions concerning system-level planning and engagement for mass critical care due to disasters or pandemics and offer suggestions for system-planning, coordination, communication, and response. The suggestions in this chapter are important for all of those involved in a pandemic or disaster with multiple critically ill or injured patients, including front-line clinicians, hospital administrators, and public health or government officials. The American College of Chest Physicians (CHEST) consensus statement development process was followed in developing suggestions. Task Force members met in person to develop nine key questions believed to be most relevant for system-planning, coordination, and communication. A systematic literature review was then performed for relevant articles and documents, reports, and other publications reported since 1993. No studies of sufficient quality were identified upon which to make evidence-based recommendations. Therefore, the panel developed expert opinion-based suggestions using a modified Delphi process. Suggestions were developed and grouped according to the following thematic elements: (1) national government support of health-care coalitions/regional health authorities (HC/RHAs), (2) teamwork within HC/RHAs, (3) system-level communication, (4) system-level surge capacity and capability, (5) pediatric patients and special populations, (6) HC/RHAs and networks, (7) models of advanced regional care systems, and (8) the use of simulation for preparedness and planning. System-level planning is essential to provide care for large numbers of critically ill patients because of disaster or pandemic. It also entails a departure from the routine, independent system and involves all levels from health-care institutions to regional health authorities. National government support is critical, as are robust communication systems and advanced planning supported by realistic exercises.

  8. System-Level Planning, Coordination, and Communication

    PubMed Central

    Kanter, Robert K.; Dries, David; Luyckx, Valerie; Lim, Matthew L.; Wilgis, John; Anderson, Michael R.; Sarani, Babak; Hupert, Nathaniel; Mutter, Ryan; Devereaux, Asha V.; Christian, Michael D.; Kissoon, Niranjan; Christian, Michael D.; Devereaux, Asha V.; Dichter, Jeffrey R.; Kissoon, Niranjan; Rubinson, Lewis; Amundson, Dennis; Anderson, Michael R.; Balk, Robert; Barfield, Wanda D.; Bartz, Martha; Benditt, Josh; Beninati, William; Berkowitz, Kenneth A.; Daugherty Biddison, Lee; Braner, Dana; Branson, Richard D; Burkle, Frederick M.; Cairns, Bruce A.; Carr, Brendan G.; Courtney, Brooke; DeDecker, Lisa D.; De Jong, Marla J.; Dominguez-Cherit, Guillermo; Dries, David; Einav, Sharon; Erstad, Brian L.; Etienne, Mill; Fagbuyi, Daniel B.; Fang, Ray; Feldman, Henry; Garzon, Hernando; Geiling, James; Gomersall, Charles D.; Grissom, Colin K.; Hanfling, Dan; Hick, John L.; Hodge, James G.; Hupert, Nathaniel; Ingbar, David; Kanter, Robert K.; King, Mary A.; Kuhnley, Robert N.; Lawler, James; Leung, Sharon; Levy, Deborah A.; Lim, Matthew L.; Livinski, Alicia; Luyckx, Valerie; Marcozzi, David; Medina, Justine; Miramontes, David A.; Mutter, Ryan; Niven, Alexander S.; Penn, Matthew S.; Pepe, Paul E.; Powell, Tia; Prezant, David; Reed, Mary Jane; Rich, Preston; Rodriquez, Dario; Roxland, Beth E.; Sarani, Babak; Shah, Umair A.; Skippen, Peter; Sprung, Charles L.; Subbarao, Italo; Talmor, Daniel; Toner, Eric S.; Tosh, Pritish K.; Upperman, Jeffrey S.; Uyeki, Timothy M.; Weireter, Leonard J.; West, T. Eoin; Wilgis, John; Ornelas, Joe; McBride, Deborah; Reid, David; Baez, Amado; Baldisseri, Marie; Blumenstock, James S.; Cooper, Art; Ellender, Tim; Helminiak, Clare; Jimenez, Edgar; Krug, Steve; Lamana, Joe; Masur, Henry; Mathivha, L. Rudo; Osterholm, Michael T.; Reynolds, H. Neal; Sandrock, Christian; Sprecher, Armand; Tillyard, Andrew; White, Douglas; Wise, Robert; Yeskey, Kevin

    2014-01-01

    BACKGROUND: System-level planning involves uniting hospitals and health systems, local/regional government agencies, emergency medical services, and other health-care entities involved in coordinating and enabling care in a major disaster. We reviewed the literature and sought expert opinions concerning system-level planning and engagement for mass critical care due to disasters or pandemics and offer suggestions for system-planning, coordination, communication, and response. The suggestions in this chapter are important for all of those involved in a pandemic or disaster with multiple critically ill or injured patients, including front-line clinicians, hospital administrators, and public health or government officials. METHODS: The American College of Chest Physicians (CHEST) consensus statement development process was followed in developing suggestions. Task Force members met in person to develop nine key questions believed to be most relevant for system-planning, coordination, and communication. A systematic literature review was then performed for relevant articles and documents, reports, and other publications reported since 1993. No studies of sufficient quality were identified upon which to make evidence-based recommendations. Therefore, the panel developed expert opinion-based suggestions using a modified Delphi process. RESULTS: Suggestions were developed and grouped according to the following thematic elements: (1) national government support of health-care coalitions/regional health authorities (HC/RHAs), (2) teamwork within HC/RHAs, (3) system-level communication, (4) system-level surge capacity and capability, (5) pediatric patients and special populations, (6) HC/RHAs and networks, (7) models of advanced regional care systems, and (8) the use of simulation for preparedness and planning. CONCLUSIONS: System-level planning is essential to provide care for large numbers of critically ill patients because of disaster or pandemic. It also entails a departure from the routine, independent system and involves all levels from health-care institutions to regional health authorities. National government support is critical, as are robust communication systems and advanced planning supported by realistic exercises. PMID:25144713

  9. The Effects of Top Management Support on Strategic Information Systems Planning Success

    ERIC Educational Resources Information Center

    Elysee, Gerald

    2012-01-01

    The success of strategic information systems planning (SISP) is of paramount importance to academics as well as practitioners. SISP is a management process that enables organizations to successfully harness the power of current- and next-generation information systems (IS) applications to fulfill their business goals. Hence, by capturing the major…

  10. Role of Information in Consumer Selection of Health Plans

    PubMed Central

    Sainfort, François; Booske, Bridget C.

    1996-01-01

    Considerable efforts are underway in the public and private sectors to increase the amount of information available to consumers when making health plan choices. The objective of this study was to examine the role of information in consumer health plan decisionmaking. A computer system was developed which provides different plan descriptions with the option of accessing varying types and levels of information. The system tracked the information search processes and recorded the hypothetical plan choices of 202 subjects. Results are reported showing the relationship between information and problem perception, preference structure, choice of plan, and attitude towards the decision. PMID:10165036

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fraley, John J.; Marotz, Brian L.; DosSantos, Joseph M.

    In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is onemore » of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and other features necessary for a long-term implementation plan.« less

  12. Care plans and care planning in long term conditions: a conceptual model

    PubMed Central

    Burt, J; Rick, J; Blakeman, T; Protheroe, J; Roland, M; Bower, P

    2013-01-01

    The prevalence and impact of long term conditions continues to rise. Care planning for people with long term conditions has been a policy priority for chronic disease management in a number of health care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between ‘care planning’ (the process by which health care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a ‘care plan’ (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans. PMID:23883621

  13. Enroute flight planning: The design of cooperative planning systems

    NASA Technical Reports Server (NTRS)

    Smith, Philip J.; Layton, Chuck; Mccoy, Elaine

    1990-01-01

    Design concepts and principles to guide in the building of cooperative problem solving systems are being developed and evaluated. In particular, the design of cooperative systems for enroute flight planning is being studied. The investigation involves a three stage process, modeling human performance in existing environments, building cognitive artifacts, and studying the performance of people working in collaboration with these artifacts. The most significant design concepts and principles identified thus far are the principle focus.

  14. Issues in knowledge representation to support maintainability: A case study in scientific data preparation

    NASA Technical Reports Server (NTRS)

    Chien, Steve; Kandt, R. Kirk; Roden, Joseph; Burleigh, Scott; King, Todd; Joy, Steve

    1992-01-01

    Scientific data preparation is the process of extracting usable scientific data from raw instrument data. This task involves noise detection (and subsequent noise classification and flagging or removal), extracting data from compressed forms, and construction of derivative or aggregate data (e.g. spectral densities or running averages). A software system called PIPE provides intelligent assistance to users developing scientific data preparation plans using a programming language called Master Plumber. PIPE provides this assistance capability by using a process description to create a dependency model of the scientific data preparation plan. This dependency model can then be used to verify syntactic and semantic constraints on processing steps to perform limited plan validation. PIPE also provides capabilities for using this model to assist in debugging faulty data preparation plans. In this case, the process model is used to focus the developer's attention upon those processing steps and data elements that were used in computing the faulty output values. Finally, the dependency model of a plan can be used to perform plan optimization and runtime estimation. These capabilities allow scientists to spend less time developing data preparation procedures and more time on scientific analysis tasks. Because the scientific data processing modules (called fittings) evolve to match scientists' needs, issues regarding maintainability are of prime importance in PIPE. This paper describes the PIPE system and describes how issues in maintainability affected the knowledge representation used in PIPE to capture knowledge about the behavior of fittings.

  15. The implementation of the integrated design process in the hole-plan system

    NASA Astrophysics Data System (ADS)

    Ruy, Won-Sun; Ko, Dae-Eun; Yang, Young-Soon

    2012-12-01

    All current shipyards are using the customized CAD/CAM programs in order to improve the design quality and increase the design efficiency. Even though the data structures for ship design and construction are almost completed, the implementation related to the ship design processes are still in progress so that it has been the main causes of the bottleneck and delay during the middle of design process. In this study, we thought that the hole-plan system would be a good example which is remained to be improved. The people of outfitting division who don't have direct authority to edit the structural panels, should request the hull design division to install the holes for the outfitting equipment. For acceptance, they should calculate the hole position, determine the hole type, and find the intersected contour of panel. After consideration of the hull people, the requested holes are manually installed on the hull structure. As the above, many processes are needed such as communication and discussion between the divisions, drawings for hole-plan, and the consideration for the structural or production compatibility. However this iterative process takes a lot of working time and requires mental pressure to the related people and cross-division conflict. This paper will handle the hole-plan system in detail to automate the series of process and minimize the human efforts and time-consumption.

  16. Systemwide board assessment.

    PubMed

    Hafertepe, E C

    1987-01-01

    The Sisters of Charity Health Care System (SCHCS), Inc., Cincinnati, undertook a systemwide board evaluation project to support and enhance effective aspects of governance and to deal with obstacles that often arise due to differing beliefs and role confusion. A task force of chief executive officers developed the questionnaire, which was then administered to members of individual facilities' boards and the system's board. The documented highlighted value issues important to SCHCS's ministry and business activities: overall board responsibilities, financial responsibilities, strategic planning, the board's role, committee structures, the board's operating process, board education, and overall board effectiveness. The responses from each member were returned to the local boards, who analyzed them and developed an action plan. A summary of each facility's responses and action plans were forwarded to the system's corporate office. The CEO committee critiqued the process and reported on significant issues and action plans. In general, survey results revealed a strong influence of mission and philosophy in decision making, support for current processes, and effective interaction among board members. The system's corporate office will use the responses to respond to a dynamic environment and strengthen their role in the delivery of Catholic health care services.

  17. Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System

    PubMed Central

    Court, Laurence E.; Kisling, Kelly; McCarroll, Rachel; Zhang, Lifei; Yang, Jinzhong; Simonds, Hannah; du Toit, Monique; Trauernicht, Chris; Burger, Hester; Parkes, Jeannette; Mejia, Mike; Bojador, Maureen; Balter, Peter; Branco, Daniela; Steinmann, Angela; Baltz, Garrett; Gay, Skylar; Anderson, Brian; Cardenas, Carlos; Jhingran, Anuja; Shaitelman, Simona; Bogler, Oliver; Schmeller, Kathleen; Followill, David; Howell, Rebecca; Nelson, Christopher; Peterson, Christine; Beadle, Beth

    2018-01-01

    The Radiation Planning Assistant (RPA) is a system developed for the fully automated creation of radiotherapy treatment plans, including volume-modulated arc therapy (VMAT) plans for patients with head/neck cancer and 4-field box plans for patients with cervical cancer. It is a combination of specially developed in-house software that uses an application programming interface to communicate with a commercial radiotherapy treatment planning system. It also interfaces with a commercial secondary dose verification software. The necessary inputs to the system are a Treatment Plan Order, approved by the radiation oncologist, and a simulation computed tomography (CT) image, approved by the radiographer. The RPA then generates a complete radiotherapy treatment plan. For the cervical cancer treatment plans, no additional user intervention is necessary until the plan is complete. For head/neck treatment plans, after the normal tissue and some of the target structures are automatically delineated on the CT image, the radiation oncologist must review the contours, making edits if necessary. They also delineate the gross tumor volume. The RPA then completes the treatment planning process, creating a VMAT plan. Finally, the completed plan must be reviewed by qualified clinical staff. PMID:29708544

  18. A Domain Description Language for Data Processing

    NASA Technical Reports Server (NTRS)

    Golden, Keith

    2003-01-01

    We discuss an application of planning to data processing, a planning problem which poses unique challenges for domain description languages. We discuss these challenges and why the current PDDL standard does not meet them. We discuss DPADL (Data Processing Action Description Language), a language for describing planning domains that involve data processing. DPADL is a declarative, object-oriented language that supports constraints and embedded Java code, object creation and copying, explicit inputs and outputs for actions, and metadata descriptions of existing and desired data. DPADL is supported by the IMAGEbot system, which we are using to provide automation for an ecological forecasting application. We compare DPADL to PDDL and discuss changes that could be made to PDDL to make it more suitable for representing planning domains that involve data processing actions.

  19. Innovation in environmental streamlining and project delivery : the Oregon State Bridge Delivery Program.

    DOT National Transportation Integrated Search

    2007-01-01

    Surface transportation planning in the United States has become a complex system of intergovernmental planning : and environmental compliance requirements over the past several decades. As a result, the process from planning : stage to project implem...

  20. 76 FR 77300 - Alaska Federal Lands Long Range Transportation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... of and actions for coordinated planning and decision making among federal land management agencies... consolidate efforts through long-term coordination in transportation planning and decision-making processes... implementing projects; facilitating objective decision making for the transportation system; and developing...

  1. Bidding-based autonomous process planning and scheduling

    NASA Astrophysics Data System (ADS)

    Gu, Peihua; Balasubramanian, Sivaram; Norrie, Douglas H.

    1995-08-01

    Improving productivity through computer integrated manufacturing systems (CIMS) and concurrent engineering requires that the islands of automation in an enterprise be completely integrated. The first step in this direction is to integrate design, process planning, and scheduling. This can be achieved through a bidding-based process planning approach. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling, and schedule. Each machine has its own process planner and responds to the product's request in a different way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date, and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system with the task decomposition and planning achieved through contract nets. The examples are included to illustrate the approach.

  2. Situational analysis and future directions of AYUSH: An assessment through 5-year plans of India.

    PubMed

    Samal, Janmejaya

    2015-01-01

    AYUSH is an acronym for Ayurveda, Yoga and Naturopathy, Unani, Siddha, and Homeopathy. These are the six indigenous systems of medicine practiced in India. A department called Department of Indian System of medicine was created in March 1995 and renamed to AYUSH in November 2003 with a focus to provide increased attention for the development of these systems. Very recently, in 2014, a separate ministry was created under the union Government of India, which is headed by a minister of state. Planning regarding these systems of medicine was a part of 5-year planning process since 1951. Since then many developments have happened in this sector albeit the system was struggling with a great degree of uncertainty at the time of 1(st)5-year plan. A progressive path of development could be observed since the first to the 12(th)5-year plan. It was up to the 7(th)plan the growth was little sluggish and from 8(th)plan onward the growth took its pace and several innovative development processes could be observed thereafter. The system is gradually progressing ahead with a vision to be a globally accepted system, as envisaged in 11(th)5-year plan. Currently, AYUSH system is a part of mainstream health system implemented under National Rural Health Mission (NRHM). NRHM came into play in 2005 but implemented at ground level in 2006 and introduced the scheme of "Mainstreaming of AYUSH and revitalization of local health traditions" to strengthen public health services. This scheme is currently in operation in its second phase, since 1(st)April 2012, with the 12(th)5-year plan. The scheme was primarily brought in to operation with three important objectives; choice of treatment system to the patients, strengthen facility functionally and strengthen the implementation of national health programmes, however, in some places it seems to be a forced medical pluralism owing to a top-down approach by the union government without considerable involvement of the concerned community. In this study, the 5-year planning documents have been reviewed, from the 1(st)plan to 12(th)plan, to enable reflection and throw some light into the future directions of AYUSH system.

  3. Rapid Development: A Content Analysis Comparison of Literature and Purposive Sampling of AFRL Rapid Reaction Projects

    DTIC Science & Technology

    2011-12-01

    systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical

  4. Strategic Planning for Management Information Systems.

    ERIC Educational Resources Information Center

    Ein-Dor, Phillip; Segev, Eli

    1978-01-01

    Two factors predominate in determining the appropriateness of strategic plans for management information systems (MIS)--explicitness (the degree to which the process is conscious, formal, and documented) and situational fit (the degree to which the MIS is compatible with the specific organization and its members). (Author/IRT)

  5. Accentra Pharmaceuticals: Thrashing through ERP Systems

    ERIC Educational Resources Information Center

    Bradds, Nathan; Hills, Emily; Masters, Kelly; Weiss, Kevin; Havelka, Douglas

    2017-01-01

    Implementing and integrating an Enterprise Resource Planning (ERP) system into an organization is an enormous undertaking that requires substantial cash outlays, time commitments, and skilled IT and business personnel. It requires careful and detailed planning, thorough testing and training, and a change management process that creates a…

  6. CQI: using the Hoshin planning system to design an orientation process.

    PubMed

    Platt, D; Laird, C

    1995-01-01

    The Hoshin planning system, developed in Japan after World War II, includes management tools intended specifically for planning new processes. There are seven tools, which can be used individually or in any combination: affinity diagrams, interrelationship digraphs, systematic diagrams, matrix diagrams, process decision program charts, arrow diagrams and prioritization matrices. The radiology department at Carson-Tahoe Hospital formed a CQI team to improve the training of front office clerks. The team quickly discovered that a new orientation program was needed and decided to use Hoshin tools to create one. Using the tools, the team identified and prioritized all relevant factors, described specific tasks needed to complete the planning process and how long each would take, anticipated problems, and assigned areas of responsibility to members of the team. Each time the team grew weary or discouraged, the clarity and organization afforded by the tools helped them feel productive and in control of the process. The team was amazed at the creative ideas they generated through this 3-month-long process. Not only did they develop and implement a new orientation program, they also cultivated a stronger sense of pride and confidence in their work and each other.

  7. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  8. Minimization In Digital Design As A Meta-Planning Problem

    NASA Astrophysics Data System (ADS)

    Ho, William P. C.; Wu, Jung-Gen

    1987-05-01

    In our model-based expert system for automatic digital system design, we formalize the design process into three sub-processes - compiling high-level behavioral specifications into primitive behavioral operations, grouping primitive operations into behavioral functions, and grouping functions into modules. Consideration of design minimization explicitly controls decision-making in the last two subprocesses. Design minimization, a key task in the automatic design of digital systems, is complicated by the high degree of interaction among the time sequence and content of design decisions. In this paper, we present an AI approach which directly addresses these interactions and their consequences by modeling the minimization prob-lem as a planning problem, and the management of design decision-making as a meta-planning problem.

  9. Robot path planning using expert systems and machine vision

    NASA Astrophysics Data System (ADS)

    Malone, Denis E.; Friedrich, Werner E.

    1992-02-01

    This paper describes a system developed for the robotic processing of naturally variable products. In order to plan the robot motion path it was necessary to use a sensor system, in this case a machine vision system, to observe the variations occurring in workpieces and interpret this with a knowledge based expert system. The knowledge base was acquired by carrying out an in-depth study of the product using examination procedures not available in the robotic workplace and relates the nature of the required path to the information obtainable from the machine vision system. The practical application of this system to the processing of fish fillets is described and used to illustrate the techniques.

  10. Workshop proceedings: Information Systems for Space Astrophysics in the 21st Century, volume 1

    NASA Technical Reports Server (NTRS)

    Cutts, James (Editor); Ng, Edward (Editor)

    1991-01-01

    The Astrophysical Information Systems Workshop was one of the three Integrated Technology Planning workshops. Its objectives were to develop an understanding of future mission requirements for information systems, the potential role of technology in meeting these requirements, and the areas in which NASA investment might have the greatest impact. Workshop participants were briefed on the astrophysical mission set with an emphasis on those missions that drive information systems technology, the existing NASA space-science operations infrastructure, and the ongoing and planned NASA information systems technology programs. Program plans and recommendations were prepared in five technical areas: Mission Planning and Operations; Space-Borne Data Processing; Space-to-Earth Communications; Science Data Systems; and Data Analysis, Integration, and Visualization.

  11. The Consolidated Planning and Scheduling System for Space Transportation and Space Station operations - Successful development experience

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda S.; Willoughby, John K.; Gardner, Jo A.; Shinkle, Gerald L.

    1993-01-01

    In 1992, NASA made the decision to evolve a Consolidated Planning System (CPS) by adding the Space Transportation System (STS) requirements to the Space Station Freedom (SSF) planning software. This paper describes this evolutionary process, which began with a series of six-month design-build-test cycles, using a domain-independent architecture and a set of developmental tools known as the Advanced Scheduling Environment. It is shown that, during these tests, the CPS could be used at multiple organizational levels of planning and for integrating schedules from geographically distributed (including international) planning environments. The potential for using the CPS for other planning and scheduling tasks in the SSF program is being currently examined.

  12. Responsibility and Responsiveness. The HEW Potential for the Seventies.

    ERIC Educational Resources Information Center

    Richardson, Elliot L.

    The Secretary of HEW presents an overview of departmental undertakings for the purpose of developing more responsible and responsive personnel. The major portion of the statement focuses on internal processes of responsibility and external processes of responsiveness. Departmental strategies, a planning cycle, an operational planning system,…

  13. Implementing a Systematic Planning Process in Two Very Small Rural Public Libraries.

    ERIC Educational Resources Information Center

    Senkevitch, Judith J.

    1985-01-01

    Describes a pilot project by a regional library system in central New York State to implement systematic planning activities in rural public libraries serving populations under 5,000. Motivations for the adoption of innovation and key elements in the decision making process during implementation are examined. (CLB)

  14. SU-F-T-231: Improving the Efficiency of a Radiotherapy Peer-Review System for Quality Assurance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hsu, S; Basavatia, A; Garg, M

    Purpose: To improve the efficiency of a radiotherapy peer-review system using a commercially available software application for plan quality evaluation and documentation. Methods: A commercial application, FullAccess (Radialogica LLC, Version 1.4.4), was implemented in a Citrix platform for peer-review process and patient documentation. This application can display images, isodose lines, and dose-volume histograms and create plan reports for peer-review process. Dose metrics in the report can also be benchmarked for plan quality evaluation. Site-specific templates were generated based on departmental treatment planning policies and procedures for each disease site, which generally follow RTOG protocols as well as published prospective clinicalmore » trial data, including both conventional fractionation and hypo-fractionation schema. Once a plan is ready for review, the planner exports the plan to FullAccess, applies the site-specific template, and presents the report for plan review. The plan is still reviewed in the treatment planning system, as that is the legal record. Upon physician’s approval of a plan, the plan is packaged for peer review with the plan report and dose metrics are saved to the database. Results: The reports show dose metrics of PTVs and critical organs for the plans and also indicate whether or not the metrics are within tolerance. Graphical results with green, yellow, and red lights are displayed of whether planning objectives have been met. In addition, benchmarking statistics are collected to see where the current plan falls compared to all historical plans on each metric. All physicians in peer review can easily verify constraints by these reports. Conclusion: We have demonstrated the improvement in a radiotherapy peer-review system, which allows physicians to easily verify planning constraints for different disease sites and fractionation schema, allows for standardization in the clinic to ensure that departmental policies are maintained, and builds a comprehensive database for potential clinical outcome evaluation.« less

  15. Atmospheric and Oceanographic Information Processing System (AOIPS) system description

    NASA Technical Reports Server (NTRS)

    Bracken, P. A.; Dalton, J. T.; Billingsley, J. B.; Quann, J. J.

    1977-01-01

    The development of hardware and software for an interactive, minicomputer based processing and display system for atmospheric and oceanographic information extraction and image data analysis is described. The major applications of the system are discussed as well as enhancements planned for the future.

  16. A knowledge-based approach to improving optimization techniques in system planning

    NASA Technical Reports Server (NTRS)

    Momoh, J. A.; Zhang, Z. Z.

    1990-01-01

    A knowledge-based (KB) approach to improve mathematical programming techniques used in the system planning environment is presented. The KB system assists in selecting appropriate optimization algorithms, objective functions, constraints and parameters. The scheme is implemented by integrating symbolic computation of rules derived from operator and planner's experience and is used for generalized optimization packages. The KB optimization software package is capable of improving the overall planning process which includes correction of given violations. The method was demonstrated on a large scale power system discussed in the paper.

  17. Insights into the Government’s Role in Food System Policy Making: Improving Access to Healthy, Local Food Alongside Other Priorities

    PubMed Central

    Wegener, Jessica; Raine, Kim D.; Hanning, Rhona M.

    2012-01-01

    Government actors have an important role to play in creating healthy public policies and supportive environments to facilitate access to safe, affordable, nutritious food. The purpose of this research was to examine Waterloo Region (Ontario, Canada) as a case study for “what works” with respect to facilitating access to healthy, local food through regional food system policy making. Policy and planning approaches were explored through multi-sectoral perspectives of: (a) the development and adoption of food policies as part of the comprehensive planning process; (b) barriers to food system planning; and (c) the role and motivation of the Region’s public health and planning departments in food system policy making. Forty-seven in-depth interviews with decision makers, experts in public health and planning, and local food system stakeholders provided rich insight into strategic government actions, as well as the local and historical context within which food system policies were developed. Grounded theory methods were used to identify key overarching themes including: “strategic positioning”, “partnerships” and “knowledge transfer” and related sub-themes (“aligned agendas”, “issue framing”, “visioning” and “legitimacy”). A conceptual framework to illustrate the process and features of food system policy making is presented and can be used as a starting point to engage multi-sectoral stakeholders in plans and actions to facilitate access to healthy food. PMID:23202834

  18. PLANNING MODELS FOR URBAN WATER SUPPLY EXPANSION. VOLUME 1. PLANNING FOR THE EXPANSION OF REGIONAL WATER SUPPLY SYSTEMS

    EPA Science Inventory

    A three-volume report was developed relative to the modelling of investment strategies for regional water supply planning. Volume 1 is the study of capacity expansion over time. Models to aid decision making for the deterministic case are presented, and a planning process under u...

  19. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  20. Determining robot actions for tasks requiring sensor interaction

    NASA Technical Reports Server (NTRS)

    Budenske, John; Gini, Maria

    1989-01-01

    The performance of non-trivial tasks by a mobile robot has been a long term objective of robotic research. One of the major stumbling blocks to this goal is the conversion of the high-level planning goals and commands into the actuator and sensor processing controls. In order for a mobile robot to accomplish a non-trivial task, the task must be described in terms of primitive actions of the robot's actuators. Most non-trivial tasks require the robot to interact with its environment; thus necessitating coordination of sensor processing and actuator control to accomplish the task. The main contention is that the transformation from the high level description of the task to the primitive actions should be performed primarily at execution time, when knowledge about the environment can be obtained through sensors. It is proposed to produce the detailed plan of primitive actions by using a collection of low-level planning components that contain domain specific knowledge and knowledge about the available sensors, actuators, and sensor/actuator processing. This collection will perform signal and control processing as well as serve as a control interface between an actual mobile robot and a high-level planning system. Previous research has shown the usefulness of high-level planning systems to plan the coordination of activities such to achieve a goal, but none have been fully applied to actual mobile robots due to the complexity of interacting with sensors and actuators. This control interface is currently being implemented on a LABMATE mobile robot connected to a SUN workstation and will be developed such to enable the LABMATE to perform non-trivial, sensor-intensive tasks as specified by a planning system.

  1. Strategies for Promoting Gatekeeper Course Success among Students Needing Remediation: Research Report for the Virginia Community College System

    ERIC Educational Resources Information Center

    Roksa, Josipa; Jenkins, Davis; Jaggars, Shanna Smith; Zeidenberg, Matthew; Cho, Sung-Woo

    2009-01-01

    The Virginia Community College System (VCCS) is engaged in a strategic planning process to improve performance beyond the goals in "Dateline 2009," the system's current vision and plan. A key objective is to encourage colleges to improve retention and academic success for students, particularly the substantial numbers who arrive…

  2. Wood transportation systems-a spin-off of a computerized information and mapping technique

    Treesearch

    William W. Phillips; Thomas J. Corcoran

    1978-01-01

    A computerized mapping system originally developed for planning the control of the spruce budworm in Maine has been extended into a tool for planning road net-work development and optimizing transportation costs. A budgetary process and a mathematical linear programming routine are used interactively with the mapping and information retrieval capabilities of the system...

  3. Management plan documentation standard and Data Item Descriptions (DID). Volume of the information system life-cycle and documentation standards, volume 2

    NASA Technical Reports Server (NTRS)

    Callender, E. David; Steinbacher, Jody

    1989-01-01

    This is the second of five volumes of the Information System Life-Cycle and Documentation Standards. This volume provides a well-organized, easily used standard for management plans used in acquiring, assuring, and developing information systems and software, hardware, and operational procedures components, and related processes.

  4. World weather program

    NASA Technical Reports Server (NTRS)

    1980-01-01

    A brief description of the Global Weather Experiment is presented. The world weather watch program plan is described and includes a global observing system, a global data processing system, a global telecommunication system, and a voluntary cooperation program. A summary of Federal Agency plans and programs to meet the challenges of international meteorology for the two year period, FY 1980-1981, is presented.

  5. IUS/TUG orbital operations and mission support study. Volume 4: Project planning data

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.

  6. A planning and scheduling lexicon

    NASA Technical Reports Server (NTRS)

    Cruz, Jennifer W.; Eggemeyer, William C.

    1989-01-01

    A lexicon related to mission planning and scheduling for spacecraft is presented. Planning and scheduling work is known as sequencing. Sequencing is a multistage process of merging requests from both the science and engineering arenas to accomplish the objectives defined in the requests. The multistage process begins with the creation of science and engineering goals, continues through their integration into the sequence, and eventually concludes with command execution onboard the spacecraft. The objective of this publication is to introduce some formalism into the field of spacecraft sequencing-system technology. This formalism will make it possible for researchers and potential customers to communicate about system requirements and capabilities in a common language.

  7. Wake County Public School System Design Guidelines.

    ERIC Educational Resources Information Center

    Wake County Public School System, Raleigh, NC.

    The Wake County Public School System has published its guidelines for planning and design of functional, cost effective, and durable educational facilities that are attractive and enhance the students' educational experience. The guidelines present basic planning requirement and design criteria for the entire construction process, including: codes…

  8. Cost Benefit Analysis of Enterprise Resource Planning System for the Naval Postgraduate School

    DTIC Science & Technology

    2002-06-01

    Department-wide introduction and use of appropriate commercial financial practices and reporting • Develop a strategic plan for implementing a business... Development of a process innovation approach given the current capabilities of the system, recommend possible alternatives to close gaps. E

  9. Creating a future worth experiencing: nursing strategic planning in an integrated healthcare delivery system.

    PubMed

    Drenkard, K N

    2001-01-01

    The application of a strategic planning methodology for the discipline of nursing is described in use by a large, nonprofit integrated healthcare system. The methodology uses a transformational leadership assessment tool, quality planning methods, and large group intervention to engage nurses in the implementation of strategies. Based on systems theory, the methodology outlined by the author has application at any level in an organization, from an entire delivery network, to a patient care unit. The author discusses getting started on a strategic planning journey, tools that are useful in the process, integrating already existing business plans into the strategies for nursing, preliminary measures to monitor progress, and lessons learned along the journey.

  10. Computer-aided software development process design

    NASA Technical Reports Server (NTRS)

    Lin, Chi Y.; Levary, Reuven R.

    1989-01-01

    The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.

  11. Computerized Production Process Planning. Volume 2. Benefit Analysis.

    DTIC Science & Technology

    1976-11-01

    advantage , in the long term, Systems 2 and 3 will return greater economic benefits . Plots of the cumulative present value of the cash flow by year are...is economically viable for large parts manufac- turers and does offer significant advantages over Systems I and 2 in terms of intangible benefits ...AD-RI51 996 COMPUTERIZED PRODUCTION PROCESS PLANNING VOLUME 2 i/1.. BENEFIT ANRLYSIS(U) IIT RESEARCH INST CHICRGO IL SH H HU ET AL. NOV 76 DAAHNi-76

  12. ICESat (GLAS) Science Processing Software Document Series. Volume 2; Science Data Management Plan; 4.0

    NASA Technical Reports Server (NTRS)

    Jester, Peggy L.; Hancock, David W., III

    1999-01-01

    This document provides the Data Management Plan for the GLAS Standard Data Software (SDS) supporting the GLAS instrument of the EOS ICESat Spacecraft. The SDS encompasses the ICESat Science Investigator-led Processing System (I-SIPS) Software and the Instrument Support Facility (ISF) Software. This Plan addresses the identification, authority, and description of the interface nodes associated with the GLAS Standard Data Products and the GLAS Ancillary Data.

  13. 76 FR 27114 - Self-Regulatory Organizations; NYSE Arca, Inc.; Notice of Filing and Immediate Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... CRD Processing Fee, the NASD Annual System Processing Fee, and the NYSE Arca Transfer/Re-license... Fees, the NASD Annual System Processing Fee, and the NYSE Arca Transfer/Re-license Individual Fee. Fees... Options Regulatory Surveillance Authority (``ORSA'') national market system plan and in doing so shares...

  14. The quality of paper-based versus electronic nursing care plan in Australian aged care homes: A documentation audit study.

    PubMed

    Wang, Ning; Yu, Ping; Hailey, David

    2015-08-01

    The nursing care plan plays an essential role in supporting care provision in Australian aged care. The implementation of electronic systems in aged care homes was anticipated to improve documentation quality. Standardized nursing terminologies, developed to improve communication and advance the nursing profession, are not required in aged care practice. The language used by nurses in the nursing care plan and the effect of the electronic system on documentation quality in residential aged care need to be investigated. To describe documentation practice for the nursing care plan in Australian residential aged care homes and to compare the quantity and quality of documentation in paper-based and electronic nursing care plans. A nursing documentation audit was conducted in seven residential aged care homes in Australia. One hundred and eleven paper-based and 194 electronic nursing care plans, conveniently selected, were reviewed. The quantity of documentation in a care plan was determined by the number of phrases describing a resident problem and the number of goals and interventions. The quality of documentation was measured using 16 relevant questions in an instrument developed for the study. There was a tendency to omit 'nursing problem' or 'nursing diagnosis' in the nursing process by changing these terms (used in the paper-based care plan) to 'observation' in the electronic version. The electronic nursing care plan documented more signs and symptoms of resident problems and evaluation of care than the paper-based format (48.30 vs. 47.34 out of 60, P<0.01), but had a lower total mean quality score. The electronic care plan contained fewer problem or diagnosis statements, contributing factors and resident outcomes than the paper-based system (P<0.01). Both types of nursing care plan were weak in documenting measurable and concrete resident outcomes. The overall quality of documentation content for the nursing process was no better in the electronic system than in the paper-based system. Omission of the nursing problem or diagnosis from the nursing process may reflect a range of factors behind the practice that need to be understood. Further work is also needed on qualitative aspects of the nurse care plan, nurses' attitudes towards standardized terminologies and the effect of different documentation practice on care quality and resident outcomes. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  15. Evaluation Planning, Evaluation Management, and Utilization of Evaluation Results within Adult Literacy Campaigns, Programs and Projects (with Implications for Adult Basic Education and Nonformal Education Programs in General). A Working Paper.

    ERIC Educational Resources Information Center

    Bhola, H. S.

    Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…

  16. Development and implementation of an interdisciplinary plan of care.

    PubMed

    Lewis, Cynthia; Hoffmann, Mary Lou; Gard, Angela; Coons, Jacqueline; Bichinich, Pat; Euclid, Jeff

    2005-01-01

    In January 2002 Aurora Health Care Metro Region chartered an interdisciplinary team to develop a process and structure for patient-centered interdisciplinary care planning. This unique endeavor created a process that includes the patient, family, and all clinical disciplines involved in planning and providing care to patients from system point of entry throughout the entire acute care episode. The interdisciplinary plan of care (IPOC) demonstrates the integration of prioritized problems, outcomes, and measurement toward goal attainment. This article focuses on the journey of this team to the successful implementation of an IPOC.

  17. Strategic workforce planning for a multihospital, integrated delivery system.

    PubMed

    Datz, David; Hallberg, Colleen; Harris, Kathy; Harrison, Lisa; Samples, Patience

    2012-01-01

    Banner Health has long recognized the need to anticipate, beyond the immediate operational realities or even the annual budgeting projection exercises, the necessary workforce needs of the future. Thus, in 2011, Banner implemented a workforce planning model that included structures, processes, and tools for predicting workforce needs, with particular focus on identified critical systemwide practice areas. The model represents the incorporation of labor management tools and processes with more strategic, broad-view, long-term assessment and planning mechanisms. The sequential tying of the workforce planning lifecycle with the organization's strategy and financial planning process supports alignment of goals, objectives, and resource allocation. Collaboration among strategy, finance, human resources, and operations has provided us with the ability to identify critical position groups based on 3-year strategic priorities. By engaging leaders from across the organization, focusing on activities at facility, regional, and system levels, and building in mechanisms for accountability, we are now engaged in continuous evaluations of our delivery models, the competencies and preparations necessary for the staff to effectively function within those delivery models, and developing and implementing action plans designed to ensure adequate numbers of the staff whose competencies will be suited to the work expected of them.

  18. Uncertainty management, spatial and temporal reasoning, and validation of intelligent environmental decision support systems

    USGS Publications Warehouse

    Sànchez-Marrè, Miquel; Gilbert, Karina; Sojda, Rick S.; Steyer, Jean Philippe; Struss, Peter; Rodríguez-Roda, Ignasi; Voinov, A.A.; Jakeman, A.J.; Rizzoli, A.E.

    2006-01-01

    There are inherent open problems arising when developing and running Intelligent Environmental Decision Support Systems (IEDSS). During daily operation of IEDSS several open challenge problems appear. The uncertainty of data being processed is intrinsic to the environmental system, which is being monitored by several on-line sensors and off-line data. Thus, anomalous data values at data gathering level or even uncertain reasoning process at later levels such as in diagnosis or decision support or planning can lead the environmental process to unsafe critical operation states. At diagnosis level or even at decision support level or planning level, spatial reasoning or temporal reasoning or both aspects can influence the reasoning processes undertaken by the IEDSS. Most of Environmental systems must take into account the spatial relationships between the environmental goal area and the nearby environmental areas and the temporal relationships between the current state and the past states of the environmental system to state accurate and reliable assertions to be used within the diagnosis process or decision support process or planning process. Finally, a related issue is a crucial point: are really reliable and safe the decisions proposed by the IEDSS? Are we sure about the goodness and performance of proposed solutions? How can we ensure a correct evaluation of the IEDSS? Main goal of this paper is to analyse these four issues, review some possible approaches and techniques to cope with them, and study new trends for future research within the IEDSS field.

  19. An approach to knowledge engineering to support knowledge-based simulation of payload ground processing at the Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Mcmanus, Shawn; Mcdaniel, Michael

    1989-01-01

    Planning for processing payloads was always difficult and time-consuming. With the advent of Space Station Freedom and its capability to support a myriad of complex payloads, the planning to support this ground processing maze involves thousands of man-hours of often tedious data manipulation. To provide the capability to analyze various processing schedules, an object oriented knowledge-based simulation environment called the Advanced Generic Accomodations Planning Environment (AGAPE) is being developed. Having nearly completed the baseline system, the emphasis in this paper is directed toward rule definition and its relation to model development and simulation. The focus is specifically on the methodologies implemented during knowledge acquisition, analysis, and representation within the AGAPE rule structure. A model is provided to illustrate the concepts presented. The approach demonstrates a framework for AGAPE rule development to assist expert system development.

  20. The MSFC Systems Engineering Guide: An Overview and Plan

    NASA Technical Reports Server (NTRS)

    Shelby, Jerry; Thomas, L. Dale

    2007-01-01

    This paper describes the guiding vision, progress to date and the plan forward for development of the Marshall Space Flight Center (MSFC) Systems Engineering Guide (SEG), a virtual systems engineering handbook and archive that describes the system engineering processes used by MSFC in the development of ongoing complex space systems such as the Ares launch vehicle and forthcoming ones as well. It is the intent of this website to be a "One Stop Shop' for MSFC systems engineers that will provide tutorial information, an overview of processes and procedures and links to assist system engineering with guidance and references, and provide an archive of relevant systems engineering artifacts produced by the many NASA projects developed and managed by MSFC over the years.

  1. Software for Probabilistic Risk Reduction

    NASA Technical Reports Server (NTRS)

    Hensley, Scott; Michel, Thierry; Madsen, Soren; Chapin, Elaine; Rodriguez, Ernesto

    2004-01-01

    A computer program implements a methodology, denoted probabilistic risk reduction, that is intended to aid in planning the development of complex software and/or hardware systems. This methodology integrates two complementary prior methodologies: (1) that of probabilistic risk assessment and (2) a risk-based planning methodology, implemented in a prior computer program known as Defect Detection and Prevention (DDP), in which multiple requirements and the beneficial effects of risk-mitigation actions are taken into account. The present methodology and the software are able to accommodate both process knowledge (notably of the efficacy of development practices) and product knowledge (notably of the logical structure of a system, the development of which one seeks to plan). Estimates of the costs and benefits of a planned development can be derived. Functional and non-functional aspects of software can be taken into account, and trades made among them. It becomes possible to optimize the planning process in the sense that it becomes possible to select the best suite of process steps and design choices to maximize the expectation of success while remaining within budget.

  2. Combined Log Inventory and Process Simulation Models for the Planning and Control of Sawmill Operations

    Treesearch

    Guillermo A. Mendoza; Roger J. Meimban; Philip A. Araman; William G. Luppold

    1991-01-01

    A log inventory model and a real-time hardwood process simulation model were developed and combined into an integrated production planning and control system for hardwood sawmills. The log inventory model was designed to monitor and periodically update the status of the logs in the log yard. The process simulation model was designed to estimate various sawmill...

  3. Military Decisionmaking Process: Lessons and Best Practices

    DTIC Science & Technology

    2015-03-01

    TMs, must be obtained through your pinpoint distribution system. 1 MILITARY DECISIONMAKING PROCESS Introduction “A good plan violently executed now...agencies and organizations to contact and incorporate into the planning process. • • The staff’s experience, cohesiveness, and level of rest or stress . The...minimize and relieve civilian suffering. Establishing civil security and providing essential services such as medical care, food and water, and shelter

  4. Transport aircraft loading and balancing system: Using a CLIPS expert system for military aircraft load planning

    NASA Technical Reports Server (NTRS)

    Richardson, J.; Labbe, M.; Belala, Y.; Leduc, Vincent

    1994-01-01

    The requirement for improving aircraft utilization and responsiveness in airlift operations has been recognized for quite some time by the Canadian Forces. To date, the utilization of scarce airlift resources has been planned mainly through the employment of manpower-intensive manual methods in combination with the expertise of highly qualified personnel. In this paper, we address the problem of facilitating the load planning process for military aircraft cargo planes through the development of a computer-based system. We introduce TALBAS (Transport Aircraft Loading and BAlancing System), a knowledge-based system designed to assist personnel involved in preparing valid load plans for the C130 Hercules aircraft. The main features of this system which are accessible through a convivial graphical user interface, consists of the automatic generation of valid cargo arrangements given a list of items to be transported, the user-definition of load plans and the automatic validation of such load plans.

  5. RDD-100 and the systems engineering process

    NASA Technical Reports Server (NTRS)

    Averill, Robert D.

    1994-01-01

    An effective systems engineering approach applied through the project life cycle can help Langley produce a better product. This paper demonstrates how an enhanced systems engineering process for in-house flight projects assures that each system will achieve its goals with quality performance and within planned budgets and schedules. This paper also describes how the systems engineering process can be used in combination with available software tools.

  6. Application programming in C# environment with recorded user software interactions and its application in autopilot of VMAT/IMRT treatment planning.

    PubMed

    Wang, Henry; Xing, Lei

    2016-11-08

    An autopilot scheme of volumetric-modulated arc therapy (VMAT)/intensity-modulated radiation therapy (IMRT) planning with the guidance of prior knowl-edge is established with recorded interactions between a planner and a commercial treatment planning system (TPS). Microsoft (MS) Visual Studio Coded UI is applied to record some common planner-TPS interactions as subroutines. The TPS used in this study is a Windows-based Eclipse system. The interactions of our application program with Eclipse TPS are realized through a series of subrou-tines obtained by prerecording the mouse clicks or keyboard strokes of a planner in operating the TPS. A strategy to autopilot Eclipse VMAT/IMRT plan selection process is developed as a specific example of the proposed "scripting" method. The autopiloted planning is navigated by a decision function constructed with a reference plan that has the same prescription and similar anatomy with the case at hand. The calculation proceeds by alternating between the Eclipse optimization and the outer-loop optimization independent of the Eclipse. In the C# program, the dosimetric characteristics of a reference treatment plan are used to assess and modify the Eclipse planning parameters and to guide the search for a clinically sensible treatment plan. The approach is applied to plan a head and neck (HN) VMAT case and a prostate IMRT case. Our study demonstrated the feasibility of application programming method in C# environment with recorded interactions of planner-TPS. The process mimics a planner's planning process and automatically provides clinically sensible treatment plans that would otherwise require a large amount of manual trial and error of a planner. The proposed technique enables us to harness a commercial TPS by application programming via the use of recorded human computer interactions and provides an effective tool to greatly facilitate the treatment planning process. © 2016 The Authors.

  7. Application programming in C# environment with recorded user software interactions and its application in autopilot of VMAT/IMRT treatment planning

    PubMed Central

    Wang, Henry

    2016-01-01

    An autopilot scheme of volumetric‐modulated arc therapy (VMAT)/intensity‐modulated radiation therapy (IMRT) planning with the guidance of prior knowledge is established with recorded interactions between a planner and a commercial treatment planning system (TPS). Microsoft (MS) Visual Studio Coded UI is applied to record some common planner‐TPS interactions as subroutines. The TPS used in this study is a Windows‐based Eclipse system. The interactions of our application program with Eclipse TPS are realized through a series of subroutines obtained by prerecording the mouse clicks or keyboard strokes of a planner in operating the TPS. A strategy to autopilot Eclipse VMAT/IMRT plan selection process is developed as a specific example of the proposed “scripting” method. The autopiloted planning is navigated by a decision function constructed with a reference plan that has the same prescription and similar anatomy with the case at hand. The calculation proceeds by alternating between the Eclipse optimization and the outer‐loop optimization independent of the Eclipse. In the C# program, the dosimetric characteristics of a reference treatment plan are used to assess and modify the Eclipse planning parameters and to guide the search for a clinically sensible treatment plan. The approach is applied to plan a head and neck (HN) VMAT case and a prostate IMRT case. Our study demonstrated the feasibility of application programming method in C# environment with recorded interactions of planner‐TPS. The process mimics a planner's planning process and automatically provides clinically sensible treatment plans that would otherwise require a large amount of manual trial and error of a planner. The proposed technique enables us to harness a commercial TPS by application programming via the use of recorded human computer interactions and provides an effective tool to greatly facilitate the treatment planning process. PACS number(s): 87.55.D‐, 87.55.kd, 87.55.de PMID:27929493

  8. Principles for Health System Capacity Planning: Insights for Healthcare Leaders.

    PubMed

    Shaw, James; Wong, Ivy; Griffin, Bailey; Robertson, Michael; Bhatia, R Sacha

    2017-01-01

    Jurisdictions across Canada and around the world face the challenge of planning high-performing and sustainable health systems in response to growing healthcare demands. In this paper, we report on the process of developing principles for health system capacity planning by the Ministry of Health and Long-Term Care in Ontario. Integrating the results of a literature review on health system planning and a symposium with representatives from local health integration networks, we describe the following six principles in detail: (1) develop an aspirational vision, (2) establish clear leadership, (3) commit to stakeholder engagement, (4) engage patients and the public, (5) build analytics infrastructure and (6) revise policy when necessary.

  9. Los Angeles congestion reduction demonstration (Metro ExpressLanes) program. National evaluation : surveys, interviews, and workshops test plan.

    DOT National Transportation Integrated Search

    1997-09-01

    Integration of intelligent transportation systems (ITS) within a metropolitan area is crucial for effective deployment. The Early Deployment Planning (EDP) Process is one tool that allows transportation officials to plan for and implement ITS technol...

  10. Picture this

    Treesearch

    Gary Bentrup; Gary Wells

    2005-01-01

    Despite the use of planting plans and engineering drawings, many landowners find it difficult to conceptualize what a future conservation practice or system will actually look like on their landscape. This lack of understanding can create challenging barriers in the planning process and is exacerbated by the long-term commitment that many conservation systems require...

  11. Major Issues in the Design of New Educational Systems.

    ERIC Educational Resources Information Center

    Salisbury, David F.

    The necessity of design and planning for school restructuring with a macro focus on education systems design is discussed in this paper. Eight support and implementation strategies are identified: utilization of a formal change process; planned coordination; multiple sponsorship; formation of a grassroots collaboration network; external and…

  12. Language Planning, Naming and Character Use in China

    ERIC Educational Resources Information Center

    Zhao, Shouhui; Baldauf, Richard B., Jr.

    2007-01-01

    As Chinese characters ("hanzi") have three aspects--as a technical writing system, an aesthetic visual art (Chinese calligraphy), and a highly-charged cultural symbolic system--changing them is a complex process. In the 1950s when language planning campaigns were launched to modernise Chinese through "hanzi" standardisation,…

  13. Planning the Implementation of an Integrated On-line Acquisitions System.

    ERIC Educational Resources Information Center

    Baldwin, Paul E.

    1984-01-01

    Discusses need to consider political context of decision-making process and describes how cost data were presented to obtain management approval for implementation planning for integrated online acquisitions and fund accounting system involving Simon Fraser University, University of British Columbia, and University of Victoria. Cost, budget, and…

  14. 7 CFR 277.18 - Establishment of an Automated Data Processing (ADP) and Information Retrieval System.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) and Information Retrieval System. 277.18 Section 277.18 Agriculture Regulations of the Department of... Data Processing (ADP) and Information Retrieval System. (a) Scope and application. This section... costs of planning, design, development or installation of ADP and information retrieval systems if the...

  15. 7 CFR 277.18 - Establishment of an Automated Data Processing (ADP) and Information Retrieval System.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) and Information Retrieval System. 277.18 Section 277.18 Agriculture Regulations of the Department of... Data Processing (ADP) and Information Retrieval System. (a) Scope and application. This section... costs of planning, design, development or installation of ADP and information retrieval systems if the...

  16. 7 CFR 277.18 - Establishment of an Automated Data Processing (ADP) and Information Retrieval System.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) and Information Retrieval System. 277.18 Section 277.18 Agriculture Regulations of the Department of... Data Processing (ADP) and Information Retrieval System. (a) Scope and application. This section... costs of planning, design, development or installation of ADP and information retrieval systems if the...

  17. 7 CFR 277.18 - Establishment of an Automated Data Processing (ADP) and Information Retrieval System.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) and Information Retrieval System. 277.18 Section 277.18 Agriculture Regulations of the Department of... Data Processing (ADP) and Information Retrieval System. (a) Scope and application. This section... costs of planning, design, development or installation of ADP and information retrieval systems if the...

  18. Aligning Strategic and Information Systems Planning: A Review of Navy Efforts

    DTIC Science & Technology

    1990-03-01

    plans." [Ref. 11:p. 6] The results of the component level IR planning process are documented in Component Information Management Plans ( CIMP ). In mid...August, the CIMP’s are presented to the IR Planning Committee at the annual IR Planning Conference. Each CIMP is then distributed to all organizations...objectives promulgated in the CIMP or FASP will, if approved for development or acquisition, be further refined in project plans, which in turn, form the

  19. Using AI Planning Techniques to Automatically Generate Image Processing Procedures: A Preliminary Report

    NASA Technical Reports Server (NTRS)

    Chien, S.

    1994-01-01

    This paper describes work on the Multimission VICAR Planner (MVP) system to automatically construct executable image processing procedures for custom image processing requests for the JPL Multimission Image Processing Lab (MIPL). This paper focuses on two issues. First, large search spaces caused by complex plans required the use of hand encoded control information. In order to address this in a manner similar to that used by human experts, MVP uses a decomposition-based planner to implement hierarchical/skeletal planning at the higher level and then uses a classical operator based planner to solve subproblems in contexts defined by the high-level decomposition.

  20. Re-engineering the Federal planning process: A total Federal planning strategy, integrating NEPA with modern management tools

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eccleston, C.H.

    1997-09-05

    The National Environmental Policy Act (NEPA) of 1969 was established by Congress more than a quarter of a century ago, yet there is a surprising lack of specific tools, techniques, and methodologies for effectively implementing these regulatory requirements. Lack of professionally accepted techniques is a principal factor responsible for many inefficiencies. Often, decision makers do not fully appreciate or capitalize on the true potential which NEPA provides as a platform for planning future actions. New approaches and modem management tools must be adopted to fully achieve NEPA`s mandate. A new strategy, referred to as Total Federal Planning, is proposed formore » unifying large-scale federal planning efforts under a single, systematic, structured, and holistic process. Under this approach, the NEPA planning process provides a unifying framework for integrating all early environmental and nonenvironmental decision-making factors into a single comprehensive planning process. To promote effectiveness and efficiency, modem tools and principles from the disciplines of Value Engineering, Systems Engineering, and Total Quality Management are incorporated. Properly integrated and implemented, these planning tools provide the rigorous, structured, and disciplined framework essential in achieving effective planning. Ultimately, the goal of a Total Federal Planning strategy is to construct a unified and interdisciplinary framework that substantially improves decision-making, while reducing the time, cost, redundancy, and effort necessary to comply with environmental and other planning requirements. At a time when Congress is striving to re-engineer the governmental framework, apparatus, and process, a Total Federal Planning philosophy offers a systematic approach for uniting the disjointed and often convoluted planning process currently used by most federal agencies. Potentially this approach has widespread implications in the way federal planning is approached.« less

  1. VPipe: Virtual Pipelining for Scheduling of DAG Stream Query Plans

    NASA Astrophysics Data System (ADS)

    Wang, Song; Gupta, Chetan; Mehta, Abhay

    There are data streams all around us that can be harnessed for tremendous business and personal advantage. For an enterprise-level stream processing system such as CHAOS [1] (Continuous, Heterogeneous Analytic Over Streams), handling of complex query plans with resource constraints is challenging. While several scheduling strategies exist for stream processing, efficient scheduling of complex DAG query plans is still largely unsolved. In this paper, we propose a novel execution scheme for scheduling complex directed acyclic graph (DAG) query plans with meta-data enriched stream tuples. Our solution, called Virtual Pipelined Chain (or VPipe Chain for short), effectively extends the "Chain" pipelining scheduling approach to complex DAG query plans.

  2. Use of the self-organising map network (SOMNet) as a decision support system for regional mental health planning.

    PubMed

    Chung, Younjin; Salvador-Carulla, Luis; Salinas-Pérez, José A; Uriarte-Uriarte, Jose J; Iruin-Sanz, Alvaro; García-Alonso, Carlos R

    2018-04-25

    Decision-making in mental health systems should be supported by the evidence-informed knowledge transfer of data. Since mental health systems are inherently complex, involving interactions between its structures, processes and outcomes, decision support systems (DSS) need to be developed using advanced computational methods and visual tools to allow full system analysis, whilst incorporating domain experts in the analysis process. In this study, we use a DSS model developed for interactive data mining and domain expert collaboration in the analysis of complex mental health systems to improve system knowledge and evidence-informed policy planning. We combine an interactive visual data mining approach, the self-organising map network (SOMNet), with an operational expert knowledge approach, expert-based collaborative analysis (EbCA), to develop a DSS model. The SOMNet was applied to the analysis of healthcare patterns and indicators of three different regional mental health systems in Spain, comprising 106 small catchment areas and providing healthcare for over 9 million inhabitants. Based on the EbCA, the domain experts in the development team guided and evaluated the analytical processes and results. Another group of 13 domain experts in mental health systems planning and research evaluated the model based on the analytical information of the SOMNet approach for processing information and discovering knowledge in a real-world context. Through the evaluation, the domain experts assessed the feasibility and technology readiness level (TRL) of the DSS model. The SOMNet, combined with the EbCA, effectively processed evidence-based information when analysing system outliers, explaining global and local patterns, and refining key performance indicators with their analytical interpretations. The evaluation results showed that the DSS model was feasible by the domain experts and reached level 7 of the TRL (system prototype demonstration in operational environment). This study supports the benefits of combining health systems engineering (SOMNet) and expert knowledge (EbCA) to analyse the complexity of health systems research. The use of the SOMNet approach contributes to the demonstration of DSS for mental health planning in practice.

  3. Transmission Planning Analysis Tool

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identify weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysismore » and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less

  4. MAPGEN: Mixed-Initiative Activity Planning for the Mars Exploration Rover Mission

    NASA Technical Reports Server (NTRS)

    Ai-Chang, Mitchell; Bresina, John; Hsu, Jennifer; Jonsson, Ari; Kanefsky, Bob; McCurdy, Michael; Morris, Paul; Rajan, Kanna; Vera, Alonso; Yglesias, Jeffrey

    2004-01-01

    This document describes the Mixed initiative Activity Plan Generation system MAPGEN. This system is one of the critical tools in the Mars Exploration Rover mission surface operations, where it is used to build activity plans for each of the rovers, each Martian day. The MAPGEN system combines an existing tool for activity plan editing and resource modeling, with an advanced constraint-based reasoning and planning framework. The constraint-based planning component provides active constraint and rule enforcement, automated planning capabilities, and a variety of tools and functions that are useful for building activity plans in an interactive fashion. In this demonstration, we will show the capabilities of the system and demonstrate how the system has been used in actual Mars rover operations. In contrast to the demonstration given at ICAPS 03, significant improvement have been made to the system. These include various additional capabilities that are based on automated reasoning and planning techniques, as well as a new Constraint Editor support tool. The Constraint Editor (CE) as part of the process for generating these command loads, the MAPGEN tool provides engineers and scientists an intelligent activity planning tool that allows them to more effectively generate complex plans that maximize the science return each day. The key to the effectiveness of the MAPGEN tool is an underlying constraint-based planning and reasoning engine.

  5. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kellie, C.L.

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  6. PLANNED CHANGE AND ORGANIZATIONAL HEALTH--FIGURE AND GROUND. CHAPTER 2, CHANGE PROCESSES IN THE PUBLIC SCHOOLS.

    ERIC Educational Resources Information Center

    MILES, MATTHEW B.

    PLANNED CHANGE, CONDITIONED BY THE STATE OF THE SYSTEM IN WHICH IT OCCURS, MUST TAKE THE IMPROVEMENT OF ORGANIZATIONAL HEALTH AS A PRIMARY TARGET. THE HEALTHY SCHOOL SYSTEM IS ABLE TO FUNCTION EFFECTIVELY AND TO DEVELOP INTO A MORE FULLY FUNCTIONING SYSTEM. OF TEN ORGANIZATIONAL HEALTH DIMENSIONS APPLICABLE TO SCHOOLS, THREE ARE TASK CENTERED…

  7. Transportation Planning with Immune System Derived Approach

    NASA Astrophysics Data System (ADS)

    Sugiyama, Kenji; Yaji, Yasuhito; Ootsuki, John Takuya; Fujimoto, Yasutaka; Sekiguchi, Takashi

    This paper presents an immune system derived approach for planning transportation of materials between manufacturing processes in the factory. Transportation operations are modeled by Petri Net, and divided into submodels. Transportation orders are derived from the firing sequences of those submodels through convergence calculation by the immune system derived excitation and suppression operations. Basic evaluation of this approach is conducted by simulation-based investigation.

  8. Automated high-dose rate brachytherapy treatment planning for a single-channel vaginal cylinder applicator

    NASA Astrophysics Data System (ADS)

    Zhou, Yuhong; Klages, Peter; Tan, Jun; Chi, Yujie; Stojadinovic, Strahinja; Yang, Ming; Hrycushko, Brian; Medin, Paul; Pompos, Arnold; Jiang, Steve; Albuquerque, Kevin; Jia, Xun

    2017-06-01

    High dose rate (HDR) brachytherapy treatment planning is conventionally performed manually and/or with aids of preplanned templates. In general, the standard of care would be elevated by conducting an automated process to improve treatment planning efficiency, eliminate human error, and reduce plan quality variations. Thus, our group is developing AutoBrachy, an automated HDR brachytherapy planning suite of modules used to augment a clinical treatment planning system. This paper describes our proof-of-concept module for vaginal cylinder HDR planning that has been fully developed. After a patient CT scan is acquired, the cylinder applicator is automatically segmented using image-processing techniques. The target CTV is generated based on physician-specified treatment depth and length. Locations of the dose calculation point, apex point and vaginal surface point, as well as the central applicator channel coordinates, and the corresponding dwell positions are determined according to their geometric relationship with the applicator and written to a structure file. Dwell times are computed through iterative quadratic optimization techniques. The planning information is then transferred to the treatment planning system through a DICOM-RT interface. The entire process was tested for nine patients. The AutoBrachy cylindrical applicator module was able to generate treatment plans for these cases with clinical grade quality. Computation times varied between 1 and 3 min on an Intel Xeon CPU E3-1226 v3 processor. All geometric components in the automated treatment plans were generated accurately. The applicator channel tip positions agreed with the manually identified positions with submillimeter deviations and the channel orientations between the plans agreed within less than 1 degree. The automatically generated plans obtained clinically acceptable quality.

  9. Medical imaging and registration in computer assisted surgery.

    PubMed

    Simon, D A; Lavallée, S

    1998-09-01

    Imaging, sensing, and computing technologies that are being introduced to aid in the planning and execution of surgical procedures are providing orthopaedic surgeons with a powerful new set of tools for improving clinical accuracy, reliability, and patient outcomes while reducing costs and operating times. Current computer assisted surgery systems typically include a measurement process for collecting patient specific medical data, a decision making process for generating a surgical plan, a registration process for aligning the surgical plan to the patient, and an action process for accurately achieving the goals specified in the plan. Some of the key concepts in computer assisted surgery applied to orthopaedics with a focus on the basic framework and underlying technologies is outlined. In addition, technical challenges and future trends in the field are discussed.

  10. Aligning incentives in health care: physician practice and health system partnership.

    PubMed

    Levin, L Scott; Gustave, Lori

    2013-06-01

    The key to successfully aligning hospitals and physicians is financial integration and joint incentives for academic, quality, and clinical productivity. Many physician practices and health systems are moving toward closer integration, but mainly through consolidation and employment strategies. We describe a fully integrated physician and hospital relationship including an overview of an aligned funds flow process that affords the department support for clinical services and teaching, research, and administrative activity. We also describe a physician compensation model that provides incentive not only for increased clinical performance, but also quality and academic objectives. The content of this article was acquired through our own experience in managing the Department of Orthopaedic Surgery at the University of Pennsylvania Health System including the health system's funds flow process. Based on input from both health system leaders and the faculty, the department's compensation plan was totally redesigned to create a line-of-sight plan that credits clinical performance and academic productivity. Our model is multifactorial and provides sustainable support for the department and a compensation plan that is competitive within the local market and nationally. The health system's funds flow process has enhanced alignment of the faculty and hospitals by providing compensation for nonclinical time and assists the department's growth strategies by providing funding for new faculty and gain-sharing of improved hospital margin. The implementation of the compensation plan increased productivity by 8% in its first year with no additional resources. Academic productivity in that same year was arguably at or above any other year in the department's history in terms of accepted publications, national presentations, and research grants awarded. A model of complete integration between an academic department and a health system is achievable through a systematic process of mission-based support.

  11. Administrative and Technical Support for the U.S. Army Medical Research and Development Command Joint Working Group on Medical Chemical Defense

    DTIC Science & Technology

    1989-08-01

    microproces;qor databaAing systems for monitoring project and contract reports and program technology trans. fers, coordinating and providing administratIvo ...The JWGD 3 annual planning process generally included: - Program review by the JWGD’ membership at quarterly meetings, which consisted of the review...Office developed the program planning and budget documents associated with the planning process outlined above. Program project databases and

  12. 23 CFR 450.306 - Scope of the metropolitan transportation planning process.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... transportation improvements and State and local planned growth and economic development patterns; (6) Enhance the... transportation system development, land use, employment, economic development, human and natural environment, and... CFR part 940. (g) Preparation of the coordinated public transit-human services transportation plan, as...

  13. Instructional Television Facilities: A Planning Guide.

    ERIC Educational Resources Information Center

    Witherspoon, John P.; Kessler, William J.

    When planning an instructional television (ITV) system, it is suggested that educational objectives should outweigh technological considerations and that expert advice be secured before the planning process is far advanced. In line with the latter suggestion, the book offers a background of technical knowledge aimed at educational administrators…

  14. Multisite Assessment of Nursing Continuing Education Learning Needs Using an Electronic Tool.

    PubMed

    Winslow, Susan; Jackson, Stephanie; Cook, Lesley; Reed, Joanne Williams; Blakeney, Keshia; Zimbro, Kathie; Parker, Cindy

    2016-02-01

    A continued education needs assessment and associated education plan are required for organizations on the journey for American Nurses Credentialing Center Magnet® designation. Leveraging technology to support the assessment and analysis of continuing education needs was a new venture for a 12-hospital regional health system. The purpose of this performance improvement project was to design and conduct an enhanced process to increase the efficiency and effectiveness of gathering data on nurses' preferences and increase nurse satisfaction with the learner assessment portion of the process. Educators trialed the use of a standardized approach via an electronic survey tool to replace the highly variable processes previously used. Educators were able to view graphical summary of responses by category and setting, which substantially decreased analysis and action planning time for education implementation plans at the system, site, or setting level. Based on these findings, specific continuing education action plans were drafted for each category and classification of nurses. Copyright 2016, SLACK Incorporated.

  15. 45 CFR 309.145 - What costs are allowable for Tribal IV-D programs carried out under § 309.65(a) of this part?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...

  16. 45 CFR 309.145 - What costs are allowable for Tribal IV-D programs carried out under § 309.65(a) of this part?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...

  17. 45 CFR 309.145 - What costs are allowable for Tribal IV-D programs carried out under § 309.65(a) of this part?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...

  18. 45 CFR 309.145 - What costs are allowable for Tribal IV-D programs carried out under § 309.65(a) of this part?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...

  19. 45 CFR 309.145 - What costs are allowable for Tribal IV-D programs carried out under § 309.65(a) of this part?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...

  20. Population management, systems-based practice, and planned chronic illness care: integrating disease management competencies into primary care to improve composite diabetes quality measures.

    PubMed

    Kimura, Joe; DaSilva, Karen; Marshall, Richard

    2008-02-01

    The increasing prevalence of chronic illnesses in the United States requires a fundamental redesign of the primary care delivery system's structure and processes in order to meet the changing needs and expectations of patients. Population management, systems-based practice, and planned chronic illness care are 3 potential processes that can be integrated into primary care and are compatible with the Chronic Care Model. In 2003, Harvard Vanguard Medical Associates, a multispecialty ambulatory physician group practice based in Boston, Massachusetts, began implementing all 3 processes across its primary care practices. From 2004 to 2006, the overall diabetes composite quality measures improved from 51% to 58% for screening (HgA1c x 2, low-density lipoprotein, blood pressure in 12 months) and from 13% to 17% for intermediate outcomes (HgA1c

  1. Engineering of mechanical manufacturing from the cradle to cradle

    NASA Astrophysics Data System (ADS)

    Peralta, M. E.; Aguayo, F.; Lama, J. R.

    2012-04-01

    The sustainability of manufacturing processes lies in industrial planning and productive activity. Industrial plants are characterized by the management of resource (inputs and outputs), processing and conversion processes, which usually are organized in a linear system. Good planning will optimize the manufacturing and promoting the quality of the industrial system. Cradle to Cradle is a new paradigm for engineering and sustainable manufacturing that integrates projects (industrial parks, manufacturing plants, systems and products) in a framework consistent with the environment, adapted to the society and technology and economically viable. To carry it out, we implement this paradigm in the MGE2 (Genomic Model of Eco-innovation and Eco-design), as a methodology for designing and developing products and manufacturing systems with an approach from the cradle to cradle.

  2. SU-D-BRD-02: A Web-Based Image Processing and Plan Evaluation Platform (WIPPEP) for Future Cloud-Based Radiotherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chai, X; Liu, L; Xing, L

    Purpose: Visualization and processing of medical images and radiation treatment plan evaluation have traditionally been constrained to local workstations with limited computation power and ability of data sharing and software update. We present a web-based image processing and planning evaluation platform (WIPPEP) for radiotherapy applications with high efficiency, ubiquitous web access, and real-time data sharing. Methods: This software platform consists of three parts: web server, image server and computation server. Each independent server communicates with each other through HTTP requests. The web server is the key component that provides visualizations and user interface through front-end web browsers and relay informationmore » to the backend to process user requests. The image server serves as a PACS system. The computation server performs the actual image processing and dose calculation. The web server backend is developed using Java Servlets and the frontend is developed using HTML5, Javascript, and jQuery. The image server is based on open source DCME4CHEE PACS system. The computation server can be written in any programming language as long as it can send/receive HTTP requests. Our computation server was implemented in Delphi, Python and PHP, which can process data directly or via a C++ program DLL. Results: This software platform is running on a 32-core CPU server virtually hosting the web server, image server, and computation servers separately. Users can visit our internal website with Chrome browser, select a specific patient, visualize image and RT structures belonging to this patient and perform image segmentation running Delphi computation server and Monte Carlo dose calculation on Python or PHP computation server. Conclusion: We have developed a webbased image processing and plan evaluation platform prototype for radiotherapy. This system has clearly demonstrated the feasibility of performing image processing and plan evaluation platform through a web browser and exhibited potential for future cloud based radiotherapy.« less

  3. Technical Potential Assessment for the Renewable Energy Zone (REZ) Process: A GIS-Based Approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Nathan; Roberts, Billy J

    Geographic Information Systems (GIS)-based energy resource and technical potential assessments identify areas capable of supporting high levels of renewable energy (RE) development as part of a Renewable Energy Zone (REZ) Transmission Planning process. This document expands on the REZ Process to aid practitioners in conducting GIS-based RE resource and technical potential assessments. The REZ process is an approach to plan, approve, and build transmission infrastructure that connects REZs - geographic areas that have high-quality RE resources, suitable topography and land-use designations, and demonstrated developer interest - to the power system. The REZ process helps to increase the share of solarmore » photovoltaic (PV), wind, and other resources while also maintaining reliability and economics.« less

  4. Transformation of the California mental health system: stakeholder-driven planning as a transformational activity.

    PubMed

    Cashin, Cheryl; Scheffler, Richard; Felton, Mistique; Adams, Neal; Miller, Leonard

    2008-10-01

    This study describes strategies developed by California counties to transform their mental health systems under the 2004 Mental Health Services Act (MHSA). This voter initiative places a 1% tax on annual incomes over $1 million; tax monies are earmarked to transform county-operated mental health services into systems that are oriented more toward recovery. MHSA implementation itself can be considered "transformational" by balancing greater standardization of mental health service delivery in the state with a locally driven planning process. A qualitative content analysis of the three-year plans submitted by 12 counties to receive funds under MHSA was conducted to identify common themes, as well as innovative approaches. These 12 (out of 58) counties were chosen to represent both small and large counties, as well as geographic diversity, and they represent 62.3% of the state population. This analysis showed that the state guidelines and local planning process generated consistency across counties in establishing full-service partnerships with a "whatever it takes" approach to providing goal-directed services and supports to consumers and their families. There was, however, little convergence around the specific strategies to achieve this vision, reflecting both the local planning process and a relative lack of clear policy and guidance on evidence-based practices. There are many obstacles to the successful implementation of these ambitious plans. However, the state-guided, but stakeholder-driven, transformation in California appears to generate innovative approaches to recovery-oriented services, involve consumers and family members in service planning and delivery, and build community partnerships that create new opportunities for consumers to meet their recovery goals.

  5. Hitchhiker mission operations: Past, present, and future

    NASA Technical Reports Server (NTRS)

    Anderson, Kathryn

    1995-01-01

    What is mission operations? Mission operations is an iterative process aimed at achieving the greatest possible mission success with the resources available. The process involves understanding of the science objectives, investigation of which system capabilities can best meet these objectives, integration of the objectives and resources into a cohesive mission operations plan, evaluation of the plan through simulations, and implementation of the plan in real-time. In this paper, the authors present a comprehensive description of what the Hitchhiker mission operations approach is and why it is crucial to mission success. The authors describe the significance of operational considerations from the beginning and throughout the experiment ground and flight systems development. The authors also address the necessity of training and simulations. Finally, the authors cite several examples illustrating the benefits of understanding and utilizing the mission operations process.

  6. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... coverage determination and redetermination processes via an Internet Web site; and (iii) A system that... determination by contacting the plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8) Quality assurance policies and procedures. A description of the quality...

  7. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... coverage determination and redetermination processes via an Internet Web site; and (iii) A system that... determination by contacting the plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8) Quality assurance policies and procedures. A description of the quality...

  8. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... coverage determination and redetermination processes via an Internet Web site; and (iii) A system that... determination by contacting the plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8) Quality assurance policies and procedures. A description of the quality...

  9. How Green Is Green? Developing a Process for Determining Sustainability When Planning Campuses and Academic Buildings.

    ERIC Educational Resources Information Center

    Bernheim, Anthony

    2003-01-01

    Proposes structured workshops as the method to integrate green planning seamlessly into campus building planning. Explains that green rating systems, such as Leadership in Energy and Environmental Design (LEED), offer specific ways to gauge the environmental effectiveness of green measures. (EV)

  10. 75 FR 49928 - California Independent System Operator Corporation; Green Energy Express LLC; 21st Century...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ... (CAISO) proposed Revised Transmission Planning Process (RTPP).\\1\\ Take notice that such conference will... California Transmission Planning Group, and complies with the transmission planning principles of Order No. 890; How the various categories of transmission projects will be defined and differentiated; To what...

  11. Strategic Planning Methodology for Financial Management in the Department of the Navy

    DTIC Science & Technology

    1983-05-24

    objectives for accounting and financial management systems improvement for the Department of the Navy (DON) and for developing DON policy for overall...Strategic Financial Management Plan, in which we have provided recommendations for improving the planning process. This wedge packet is intended to provide a

  12. Family and Consumer Sciences: A Facility Planning and Design Guide for School Systems.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    This document presents design concepts and considerations for planning and developing middle and high school family and consumer sciences education facilities. It includes discussions on family and consumer sciences education trends and the facility planning process. Design concepts explore multipurpose laboratories and spaces for food/nutrition…

  13. 23 CFR 450.208 - Coordination of planning process activities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and related multistate planning efforts; (3) Consider the concerns of Federal land management agencies.... (d) States may use any one or more of the management systems (in whole or in part) described in 23 CFR part 500. (e) States may apply asset management principles and techniques in establishing planning...

  14. Project Planning and Reporting

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.

  15. LOOP: Linking Outcomes to Organizational Planning, First Quarterly Report: 25 School Board Priorities.

    ERIC Educational Resources Information Center

    Ligon, Glynn; Wicker, Maria L. R.

    The Austin Independent School District Superintendent of Schools required a process for monitoring district activities. The Office of Research and Evaluation developed LOOP (Linking Outcomes to Organizational Planning). LOOP is a management information system through which progress in a number of activities within the school system may be…

  16. The planning and control of NASA programs and resources

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.

  17. Post-Implementation Success Factors for Enterprise Resource Planning Student Administration Systems in Higher Education Institutions

    ERIC Educational Resources Information Center

    Sullivan, Linda; Bozeman, William

    2010-01-01

    Enterprise Resource Planning (ERP) systems can represent one of the largest investments of human and financial resources by a higher education institution. They also bring a significant process reengineering aspect to the institution and the associated implementation project through the integration of compiled industry best practices into the…

  18. Railroad system of Texas: A component of the state and national transportation infrastructure. Research report, September 1996--November 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roop, S.S.; Warner, J.E.; Rosa, D.

    1998-11-01

    Railroads continue to play an important role in the Texas transportation system. This study addresses the potential for implementing a rail planning process in the Texas Department of Transportation. The study is documented in three reports, produced in coordinated and parallel efforts by the Center for Transportation Research and the Texas Transportation Institute. This report documents the work performed by TTI, whereby a rail planning framework is presented which formalizes the planning process and presents the key elements as a series of discrete and logical steps. These steps may be used to guide TxDOT in the formation of goals, identificationmore » of issues and affected parties, selection of appropriate analytical methodologies, location of data sources, and implementation of results. The report also presents an in-depth discussion of several key issues facing transportation agencies. These include rail line abandonment, intermodal service planning, and urban rail rationalization. A discussion of the Texas rail system covers the Class 1 railroads, shortline railroads, Amtrak, and the Mexican rail system.« less

  19. The computer-generated treatment plan... Create the nucleus to successful systems.

    PubMed

    Bernhardt, Christene

    2004-12-01

    A well-managed, highly efficient practice relies on the comprehensive information provided through effective treatment planning. Computer-generated treatment plans are successful only if the 14 key points of information are included within the plan. Major systems such as scheduling, financial agreements, and insurance processing fail if adequate information is not provided through the treatment plan. Successful interactions with patients at the time of the consultation rely heavily on having adequate information at your fingertips. The treatment plan is truly the foundation to all communications that must occur during the patient's experience, and ensures that every team member has clear and easy access to the status of each patient as treatment unfolds.

  20. Partnership Bound: Using MAPS with Transitioning Students and Families from All Backgrounds

    ERIC Educational Resources Information Center

    Haines, Shana J.; Francis, Grace L.; Shepherd, Katharine G.; Ziegler, Meg; Mabika, Goma

    2018-01-01

    The McGill Action Planning System (also referred to as Making Action Plans or MAPS) is a supportive, strengths-based process that enables teams to understand each other and work together to support students in achieving their dreams. This process can work very well with all transitioning students with disabilities and their families, including…

  1. Benefits from remote sensing data utilization in urban planning processes and system recommendations

    NASA Technical Reports Server (NTRS)

    Mallon, H. J.; Howard, J. Y.

    1972-01-01

    The benefits of utilizing remote sensor data in the urban planning process of the Metropolitan Washington Council of Governments are investigated. An evaluation of sensor requirements, a description/ comparison of costs, benefits, levels of accuracy, ease of attainment, and frequency of update possible using sensor versus traditional data acquisition techniques are discussed.

  2. A Framework for Curriculum Research.

    ERIC Educational Resources Information Center

    Kimpston, Richard D.; Rogers, Karen B.

    1986-01-01

    A framework for generating curriculum research is proposed from a synthesis of Dunkin and Biddle's model of teaching variables with Beauchamp's "curriculum system" planning functions. The framework systematically defines variables that delineate curriculum planning processes. (CJH)

  3. PlanWorks: A Debugging Environment for Constraint Based Planning Systems

    NASA Technical Reports Server (NTRS)

    Daley, Patrick; Frank, Jeremy; Iatauro, Michael; McGann, Conor; Taylor, Will

    2005-01-01

    Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.

  4. Obtaining mathematical models for assessing efficiency of dust collectors using integrated system of analysis and data management STATISTICA Design of Experiments

    NASA Astrophysics Data System (ADS)

    Azarov, A. V.; Zhukova, N. S.; Kozlovtseva, E. Yu; Dobrinsky, D. R.

    2018-05-01

    The article considers obtaining mathematical models to assess the efficiency of the dust collectors using an integrated system of analysis and data management STATISTICA Design of Experiments. The procedure for obtaining mathematical models and data processing is considered by the example of laboratory studies on a mounted installation containing a dust collector in counter-swirling flows (CSF) using gypsum dust of various fractions. Planning of experimental studies has been carried out in order to reduce the number of experiments and reduce the cost of experimental research. A second-order non-position plan (Box-Bencken plan) was used, which reduced the number of trials from 81 to 27. The order of statistical data research of Box-Benken plan using standard tools of integrated system for analysis and data management STATISTICA Design of Experiments is considered. Results of statistical data processing with significance estimation of coefficients and adequacy of mathematical models are presented.

  5. Problem Solving for Volatilizing Situation in Nursing: Developing Thinking Process Supporting System using NursingNAVI® Contents.

    PubMed

    Tsuru, Satoko; Wako, Fumiko; Omori, Miho; Sudo, Kumiko

    2015-01-01

    We have identified three foci of the nursing observation and nursing action respectively. Using these frameworks, we have developed the structured knowledge model for a number of diseases and medical interventions. We developed this structure based NursingNAVI® contents collaborated with some quality centered hospitals. Authors analysed the nursing care documentations of post-gastrectomy patients in light of the standardized nursing care plan in the "NursingNAVI®" developed by ourselves and revealed the "failure to observe" and "failure to document", which leaded to the volatility of the patients' data, conditions and some situation. This phenomenon should have been avoided if nurses had employed a standardized nursing care plan. So, we developed thinking process support system for planning, delivering, recording and evaluating in daily nursing using NursingNAVI® contents. A hospital decided to use NursingNAVI® contents in HIS. It was suggested that the system has availability for nursing OJT and time reduction of planning and recording without volatilizing situation.

  6. Financing strategic plans for not-for-profits.

    PubMed

    Wong-Hammond, Laca; Damon, Lorie

    2013-07-01

    To succeed in today's complex economic environment, a not-for-profit health system requires an effective strategic capital planning process that harmonizes three elements: The organization's long-term business plan and mission. Existing financial resources and finance options available to support the organization's business plan. Financial risk and return on equity to the organization's stakeholders (within acceptable parameters for business risk).

  7. Supply chain planning classification

    NASA Astrophysics Data System (ADS)

    Hvolby, Hans-Henrik; Trienekens, Jacques; Bonde, Hans

    2001-10-01

    Industry experience a need to shift in focus from internal production planning towards planning in the supply network. In this respect customer oriented thinking becomes almost a common good amongst companies in the supply network. An increase in the use of information technology is needed to enable companies to better tune their production planning with customers and suppliers. Information technology opportunities and supply chain planning systems facilitate companies to monitor and control their supplier network. In spite if these developments, most links in today's supply chains make individual plans, because the real demand information is not available throughout the chain. The current systems and processes of the supply chains are not designed to meet the requirements now placed upon them. For long term relationships with suppliers and customers, an integrated decision-making process is needed in order to obtain a satisfactory result for all parties. Especially when customized production and short lead-time is in focus. An effective value chain makes inventory available and visible among the value chain members, minimizes response time and optimizes total inventory value held throughout the chain. In this paper a supply chain planning classification grid is presented based current manufacturing classifications and supply chain planning initiatives.

  8. 76 FR 34713 - Proposed Establishment of a Federally Funded Research and Development Center-Third Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... (FFRDC) to facilitate the modernization of business processes and supporting systems and their operations... processes and supporting systems and their operations. Some of the broad task areas that will be utilized..., organizational planning, research and development, continuous process improvement, Independent Verification and...

  9. An integrated decision model for the application of airborne sensors for improved response to accidental and terrorist chemical vapor releases

    NASA Astrophysics Data System (ADS)

    Kapitan, Loginn

    This research created a new model which provides an integrated approach to planning the effective selection and employment of airborne sensor systems in response to accidental or intentional chemical vapor releases. The approach taken was to use systems engineering and decision analysis methods to construct a model architecture which produced a modular structure for integrating both new and existing components into a logical procedure to assess the application of airborne sensor systems to address chemical vapor hazards. The resulting integrated process model includes an internal aggregation model which allowed differentiation among alternative airborne sensor systems. Both models were developed and validated by experts and demonstrated using appropriate hazardous chemical release scenarios. The resultant prototype integrated process model or system fills a current gap in capability allowing improved planning, training and exercise for HAZMAT teams and first responders when considering the selection and employment of airborne sensor systems. Through the research process, insights into the current response structure and how current airborne capability may be most effectively used were generated. Furthermore, the resultant prototype system is tailorable for local, state, and federal application, and can potentially be modified to help evaluate investments in new airborne sensor technology and systems. Better planning, training and preparedness exercising holds the prospect for the effective application of airborne assets for improved response to large scale chemical release incidents. Improved response will result in fewer casualties and lives lost, reduced economic impact, and increased protection of critical infrastructure when faced with accidental and intentional terrorist release of hazardous industrial chemicals. With the prospect of more airborne sensor systems becoming available, this prototype system integrates existing and new tools into an effective process for the selection and employment of airborne sensors to better plan, train and exercise ahead of potential chemical release events.

  10. NASA earth science and applications division: The program and plans for FY 1988-1989-1990

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Described here are the Division's research goals, priorities and emphases for the next several years and an outline of longer term plans. Included are highlights of recent accomplishments, current activities in FY 1988, research emphases in FY 1989, and longer term future plans. Data and information systems, the Geodynamics Program, the Land Processes Program, the Oceanic Processes Program, the Atmospheric Dynamics and Radiation Program, the Atmospheric Chemistry Program, and space flight programs are among the topic covered.

  11. The Impact of Maintenance Free Operating Period Approach to Acquisition Approaches, System Sustainment, and Costs

    DTIC Science & Technology

    2013-01-07

    of MFOP principles on processes, procedures , and costs in acquisition planning. It investigates MFOP and reviews the results of a 2005 submarine pilot...approach be a game changer? This paper evaluates the potential impact of MFOP principles on processes, procedures , and costs in acquisition planning. It...elli=lc=_rpfkbpp=C=mr_if`=mlif`v= = - 2 - k^s^i=mlpqdo^ar^qb=p`elli= procedures , and costs in acquisition planning. The scope of the research was to

  12. Building Bridges: A Comprehensive System for Healthy Development and School Readiness. Building State Early Childhood Comprehensive Systems Series, Number 1

    ERIC Educational Resources Information Center

    Halfon, Neal; Uyeda, Kimberly; Inkelas, Moira; Rice, Thomas

    2004-01-01

    This report is designed to support the planning and implementation of the Maternal and Child Health Bureau (MCHB) State Early Childhood Comprehensive Systems (SECCS) Initiative. It addresses a set of principles that these agencies can use to advance their planning process, reach out to new partners, develop collaborative strategies, and build a…

  13. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, A.G.

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  14. Combination of an electrolytic pretreatment unit with secondary water reclamation processes

    NASA Technical Reports Server (NTRS)

    Wells, G. W.; Bonura, M. S.

    1973-01-01

    The design and fabrication of a flight concept prototype electrolytic pretreatment unit (EPU) and of a contractor-furnished air evaporation unit (AEU) are described. The integrated EPU and AEU potable water recovery system is referred to as the Electrovap and is capable of processing the urine and flush water of a six-man crew. Results of a five-day performance verification test of the Electrovap system are presented and plans are included for the extended testing of the Electrovap to produce data applicable to the combination of electrolytic pretreatment with most final potable water recovery systems. Plans are also presented for a program to define the design requirements for combining the electrolytic pretreatment unit with a reverse osmosis final processing unit.

  15. Power system restoration - A task force report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adibi, M.; Clelland, P.; Link, L.

    1987-05-01

    The IEEE PES System Operation Subcommittee has established the Power System Restoration Task Force to: review operating practices, conduct a literature search, prepare relevant glossaries and bibliographies, and promote information exchange through technical papers. This is the first report of the Task Force. The problem of bulk power system restoration following a complete or partial collapse is practically as old as the electric utility industry itself. Many electric utilities have developed over the years system restoration schemes that meet the needs of their particular systems. These plans provide a great deal of insight into how the restorative process is viewedmore » by operating and planning personnel and what concerns and constraints any plan must operate under.« less

  16. FRIB cryogenic system status

    NASA Astrophysics Data System (ADS)

    Casagrande, F.; Ganni, V.; Knudsen, P.; Jones, S.; Sidi-Yekhlef, A.; Tatsumoto, H.; Nguyen, C.; Fila, A.; Vargas, G.; Dudley, C.; Joseph, N.; Stanley, S.; Dixon, K.; Norton, R.; Laverdure, N.; Yang, S.

    2017-12-01

    Construction and installation of the FRIB 4.5 K helium refrigeration system is nearing completion, with compressor system commissioning and 4.5 K refrigerator commissioning on schedule to occur in late 2017. The LINAC 4.5 K helium distribution system, all major process equipment, and the cryogenic distribution for the sub-systems have been procured and delivered. The sub-atmospheric cold box fabrication is planned to begin the summer of 2017, which is on schedule for commissioning in the spring of 2018. Commissioning of the support systems, such as the helium gas storage, helium purifier, and oil processor is planned to be complete by the summer of 2017. This paper presents details of the equipment procured, installation status and commissioning plans.

  17. Integrated system dynamics toolbox for water resources planning.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reno, Marissa Devan; Passell, Howard David; Malczynski, Leonard A.

    2006-12-01

    Public mediated resource planning is quickly becoming the norm rather than the exception. Unfortunately, supporting tools are lacking that interactively engage the public in the decision-making process and integrate over the myriad values that influence water policy. In the pages of this report we document the first steps toward developing a specialized decision framework to meet this need; specifically, a modular and generic resource-planning ''toolbox''. The technical challenge lies in the integration of the disparate systems of hydrology, ecology, climate, demographics, economics, policy and law, each of which influence the supply and demand for water. Specifically, these systems, their associatedmore » processes, and most importantly the constitutive relations that link them must be identified, abstracted, and quantified. For this reason, the toolbox forms a collection of process modules and constitutive relations that the analyst can ''swap'' in and out to model the physical and social systems unique to their problem. This toolbox with all of its modules is developed within the common computational platform of system dynamics linked to a Geographical Information System (GIS). Development of this resource-planning toolbox represents an important foundational element of the proposed interagency center for Computer Aided Dispute Resolution (CADRe). The Center's mission is to manage water conflict through the application of computer-aided collaborative decision-making methods. The Center will promote the use of decision-support technologies within collaborative stakeholder processes to help stakeholders find common ground and create mutually beneficial water management solutions. The Center will also serve to develop new methods and technologies to help federal, state and local water managers find innovative and balanced solutions to the nation's most vexing water problems. The toolbox is an important step toward achieving the technology development goals of this center.« less

  18. Teaching Tip: Using a Group Role-Play Exercise to Engage Students in Learning Business Processes and ERP

    ERIC Educational Resources Information Center

    Shen, Yide; Nicholson, Jennifer; Nicholson, Darren

    2015-01-01

    With the increasing process-centric focus and proliferation of Enterprise Resource Planning (ERP) systems in organizations, it is imperative for business graduates to understand cross-functional business processes and ERP system's role in supporting business processes. However, this topic can be rather abstract and dry to undergraduate students,…

  19. Software verification plan for GCS. [guidance and control software

    NASA Technical Reports Server (NTRS)

    Dent, Leslie A.; Shagnea, Anita M.; Hayhurst, Kelly J.

    1990-01-01

    This verification plan is written as part of an experiment designed to study the fundamental characteristics of the software failure process. The experiment will be conducted using several implementations of software that were produced according to industry-standard guidelines, namely the Radio Technical Commission for Aeronautics RTCA/DO-178A guidelines, Software Consideration in Airborne Systems and Equipment Certification, for the development of flight software. This plan fulfills the DO-178A requirements for providing instructions on the testing of each implementation of software. The plan details the verification activities to be performed at each phase in the development process, contains a step by step description of the testing procedures, and discusses all of the tools used throughout the verification process.

  20. DBMS UTILIZATION: A Corporate Information System (CIS) development approach

    NASA Technical Reports Server (NTRS)

    Rozett, P.

    1983-01-01

    The Corporate Information System (CIS), an integrated information system intended to tie the corporation together as a functioning entity, is described. In addition to being a major upgraded automated data processing system, the CIS is a management philosophy which recognizes data as a valuable corporate resource and which distinguishes between data and selected data, or information. It further recognizes that different users need different kinds of information. Plans for CIS development are discussed. It will offer its users not just after-the-fact data, but timely information in a format that is meaningful and useful to the particular user, so that the information can be applied in planning, controlling, and decision making by all levels of management. In effect, CIS will help the corporation itself to function as a total, integrated system by typing together administrative activities through information exchange. The CIS supports the operational, tactical control, and strategic planning functions of the corporation. Operational functions are the day-to-day processing necessary to support the corporation's work, such as purchasing and payroll.

  1. Assessment of Techniques for Evaluating Computer Systems for Federal Agency Procurements. Final Report.

    ERIC Educational Resources Information Center

    Letmanyi, Helen

    Developed to identify and qualitatively assess computer system evaluation techniques for use during acquisition of general purpose computer systems, this document presents several criteria for comparison and selection. An introduction discusses the automatic data processing (ADP) acquisition process and the need to plan for uncertainty through…

  2. On the management and processing of earth resources information

    NASA Technical Reports Server (NTRS)

    Skinner, C. W.; Gonzalez, R. C.

    1973-01-01

    The basic concepts of a recently completed large-scale earth resources information system plan are reported. Attention is focused throughout the paper on the information management and processing requirements. After the development of the principal system concepts, a model system for implementation at the state level is discussed.

  3. Incorporating deliverable monitor unit constraints into spot intensity optimization in intensity modulated proton therapy treatment planning

    PubMed Central

    Cao, Wenhua; Lim, Gino; Li, Xiaoqiang; Li, Yupeng; Zhu, X. Ronald; Zhang, Xiaodong

    2014-01-01

    The purpose of this study is to investigate the feasibility and impact of incorporating deliverable monitor unit (MU) constraints into spot intensity optimization in intensity modulated proton therapy (IMPT) treatment planning. The current treatment planning system (TPS) for IMPT disregards deliverable MU constraints in the spot intensity optimization (SIO) routine. It performs a post-processing procedure on an optimized plan to enforce deliverable MU values that are required by the spot scanning proton delivery system. This procedure can create a significant dose distribution deviation between the optimized and post-processed deliverable plans, especially when small spot spacings are used. In this study, we introduce a two-stage linear programming (LP) approach to optimize spot intensities and constrain deliverable MU values simultaneously, i.e., a deliverable spot intensity optimization (DSIO) model. Thus, the post-processing procedure is eliminated and the associated optimized plan deterioration can be avoided. Four prostate cancer cases at our institution were selected for study and two parallel opposed beam angles were planned for all cases. A quadratic programming (QP) based model without MU constraints, i.e., a conventional spot intensity optimization (CSIO) model, was also implemented to emulate the commercial TPS. Plans optimized by both the DSIO and CSIO models were evaluated for five different settings of spot spacing from 3 mm to 7 mm. For all spot spacings, the DSIO-optimized plans yielded better uniformity for the target dose coverage and critical structure sparing than did the CSIO-optimized plans. With reduced spot spacings, more significant improvements in target dose uniformity and critical structure sparing were observed in the DSIO- than in the CSIO-optimized plans. Additionally, better sparing of the rectum and bladder was achieved when reduced spacings were used for the DSIO-optimized plans. The proposed DSIO approach ensures the deliverability of optimized IMPT plans that take into account MU constraints. This eliminates the post-processing procedure required by the TPS as well as the resultant deteriorating effect on ultimate dose distributions. This approach therefore allows IMPT plans to adopt all possible spot spacings optimally. Moreover, dosimetric benefits can be achieved using smaller spot spacings. PMID:23835656

  4. Using artificial intelligence to automate remittance processing.

    PubMed

    Adams, W T; Snow, G M; Helmick, P M

    1998-06-01

    The consolidated business office of the Allegheny Health Education Research Foundation (AHERF), a large integrated healthcare system based in Pittsburgh, Pennsylvania, sought to improve its cash-related business office activities by implementing an automated remittance processing system that uses artificial intelligence. The goal was to create a completely automated system whereby all monies it processed would be tracked, automatically posted, analyzed, monitored, controlled, and reconciled through a central database. Using a phased approach, the automated payment system has become the central repository for all of the remittances for seven of the hospitals in the AHERF system and has allowed for the complete integration of these hospitals' existing billing systems, document imaging system, and intranet, as well as the new automated payment posting, and electronic cash tracking and reconciling systems. For such new technology, which is designed to bring about major change, factors contributing to the project's success were adequate planning, clearly articulated objectives, marketing, end-user acceptance, and post-implementation plan revision.

  5. Strategic management system in a healthcare setting--moving from strategy to results.

    PubMed

    Devitt, Rob; Klassen, Wolf; Martalog, Julian

    2005-01-01

    One of the historical challenges in the healthcare system has been the identification and collection of meaningful data to measure an organization's progress towards the achievement of its strategic goals and the concurrent alignment of internal operating practices with this strategy. Over the last 18 months the Toronto East General Hospital (TEGH) has adopted a strategic management system and organizing framework that has led to a metric-based strategic plan. It has allowed for formal and measurable linkages across a full range of internal business processes, from the annual operating plan to resource allocation decisions, to the balanced scorecard and individual performance evaluations. The Strategic Management System (SMS) aligns organizational planning and performance measurement, facilitates an appropriate balance between organizational priorities and resolving "local" problems, and encourages behaviours that are consistent with the values upon which the organization is built. The TEGH Accountability Framework serves as the foundation for the entire system. A key tool of the system is the rolling three-year strategic plan for the organization that sets out specific annual improvement targets on a number of key strategic measures. Individual program/department plans with corresponding measures ensure that the entire organization is moving forward strategically. Each year, all plans are reviewed, with course adjustments made to reflect changes in the hospital's environment and with re-calibration of performance targets for the next three years to ensure continued improvement and organizational progress. This system has been used through one annual business cycle. Results from the past year show measurable success. The hospital has improved on 12 of the 15 strategic plan metrics, including achieving the targeted 1% operating surplus while operating in an environment of tremendous change and uncertainty. This article describes the strategic management system used at TEGH and demonstrates the formal integration of the plan into its operating and decision making processes. It also provides examples of the metrics, their use in decision-making and the variance reporting and improvement mechanisms. The article also demonstrates that a measurement-oriented approach to the planning and delivery of community hospital service is both achievable and valuable in terms of accountability and organizational responsiveness.

  6. Comparison of the dose distribution obtained from dosimetric systems with intensity modulated radiotherapy planning system in the treatment of prostate cancer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gökçe, M., E-mail: mgokce@adu.edu.tr; Uslu, D. Koçyiğit; Ertunç, C.

    The aim of this study is to compare Intensity Modulated Radiation Therapy (IMRT) plan of prostate cancer patients with different dose verification systems in dosimetric aspects and to compare these systems with each other in terms of reliability, applicability and application time. Dosimetric control processes of IMRT plan of three prostate cancer patients were carried out using thermoluminescent dosimeter (TLD), ion chamber (IC) and 2D Array detector systems. The difference between the dose values obtained from the dosimetric systems and treatment planning system (TPS) were found to be about % 5. For the measured (TLD) and calculated (TPS) doses %3more » percentage differences were obtained for the points close to center while percentage differences increased at the field edges. It was found that TLD and IC measurements will increase the precision and reliability of the results of 2D Array.« less

  7. Generation capacity expansion planning in deregulated electricity markets

    NASA Astrophysics Data System (ADS)

    Sharma, Deepak

    With increasing demand of electric power in the context of deregulated electricity markets, a good strategic planning for the growth of the power system is critical for our tomorrow. There is a need to build new resources in the form of generation plants and transmission lines while considering the effects of these new resources on power system operations, market economics and the long-term dynamics of the economy. In deregulation, the exercise of generation planning has undergone a paradigm shift. The first stage of generation planning is now undertaken by the individual investors. These investors see investments in generation capacity as an increasing business opportunity because of the increasing market prices. Therefore, the main objective of such a planning exercise, carried out by individual investors, is typically that of long-term profit maximization. This thesis presents some modeling frameworks for generation capacity expansion planning applicable to independent investor firms in the context of power industry deregulation. These modeling frameworks include various technical and financing issues within the process of power system planning. The proposed modeling frameworks consider the long-term decision making process of investor firms, the discrete nature of generation capacity addition and incorporates transmission network modeling. Studies have been carried out to examine the impact of the optimal investment plans on transmission network loadings in the long-run by integrating the generation capacity expansion planning framework within a modified IEEE 30-bus transmission system network. The work assesses the importance of arriving at an optimal IRR at which the firm's profit maximization objective attains an extremum value. The mathematical model is further improved to incorporate binary variables while considering discrete unit sizes, and subsequently to include the detailed transmission network representation. The proposed models are novel in the sense that the planning horizon is split into plan sub-periods so as to minimize the overall risks associated with long-term plan models, particularly in the context of deregulation.

  8. Automation and Intensity Modulated Radiation Therapy for Individualized High-Quality Tangent Breast Treatment Plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Purdie, Thomas G., E-mail: Tom.Purdie@rmp.uhn.on.ca; Department of Radiation Oncology, University of Toronto, Toronto, Ontario; Techna Institute, University Health Network, Toronto, Ontario

    Purpose: To demonstrate the large-scale clinical implementation and performance of an automated treatment planning methodology for tangential breast intensity modulated radiation therapy (IMRT). Methods and Materials: Automated planning was used to prospectively plan tangential breast IMRT treatment for 1661 patients between June 2009 and November 2012. The automated planning method emulates the manual steps performed by the user during treatment planning, including anatomical segmentation, beam placement, optimization, dose calculation, and plan documentation. The user specifies clinical requirements of the plan to be generated through a user interface embedded in the planning system. The automated method uses heuristic algorithms to definemore » and simplify the technical aspects of the treatment planning process. Results: Automated planning was used in 1661 of 1708 patients receiving tangential breast IMRT during the time interval studied. Therefore, automated planning was applicable in greater than 97% of cases. The time for treatment planning using the automated process is routinely 5 to 6 minutes on standard commercially available planning hardware. We have shown a consistent reduction in plan rejections from plan reviews through the standard quality control process or weekly quality review multidisciplinary breast rounds as we have automated the planning process for tangential breast IMRT. Clinical plan acceptance increased from 97.3% using our previous semiautomated inverse method to 98.9% using the fully automated method. Conclusions: Automation has become the routine standard method for treatment planning of tangential breast IMRT at our institution and is clinically feasible on a large scale. The method has wide clinical applicability and can add tremendous efficiency, standardization, and quality to the current treatment planning process. The use of automated methods can allow centers to more rapidly adopt IMRT and enhance access to the documented improvements in care for breast cancer patients, using technologies that are widely available and already in clinical use.« less

  9. Automation and intensity modulated radiation therapy for individualized high-quality tangent breast treatment plans.

    PubMed

    Purdie, Thomas G; Dinniwell, Robert E; Fyles, Anthony; Sharpe, Michael B

    2014-11-01

    To demonstrate the large-scale clinical implementation and performance of an automated treatment planning methodology for tangential breast intensity modulated radiation therapy (IMRT). Automated planning was used to prospectively plan tangential breast IMRT treatment for 1661 patients between June 2009 and November 2012. The automated planning method emulates the manual steps performed by the user during treatment planning, including anatomical segmentation, beam placement, optimization, dose calculation, and plan documentation. The user specifies clinical requirements of the plan to be generated through a user interface embedded in the planning system. The automated method uses heuristic algorithms to define and simplify the technical aspects of the treatment planning process. Automated planning was used in 1661 of 1708 patients receiving tangential breast IMRT during the time interval studied. Therefore, automated planning was applicable in greater than 97% of cases. The time for treatment planning using the automated process is routinely 5 to 6 minutes on standard commercially available planning hardware. We have shown a consistent reduction in plan rejections from plan reviews through the standard quality control process or weekly quality review multidisciplinary breast rounds as we have automated the planning process for tangential breast IMRT. Clinical plan acceptance increased from 97.3% using our previous semiautomated inverse method to 98.9% using the fully automated method. Automation has become the routine standard method for treatment planning of tangential breast IMRT at our institution and is clinically feasible on a large scale. The method has wide clinical applicability and can add tremendous efficiency, standardization, and quality to the current treatment planning process. The use of automated methods can allow centers to more rapidly adopt IMRT and enhance access to the documented improvements in care for breast cancer patients, using technologies that are widely available and already in clinical use. Copyright © 2014 Elsevier Inc. All rights reserved.

  10. Planning and Resource Management in an Intelligent Automated Power Management System

    NASA Technical Reports Server (NTRS)

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  11. Tank waste remediation system systems engineering management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peck, L.G.

    1998-01-08

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves.more » The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.« less

  12. Chapter 8: Planning Tools to Simulate and Optimize Neighborhood Energy Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhivov, Alexander Michael; Case, Michael Patrick; Jank, Reinhard

    This section introduces different energy modeling tools available in Europe and the USA for community energy master planning process varying from strategic Urban Energy Planning to more detailed Local Energy Planning. Two modeling tools used for Energy Master Planning of primarily residential communities, the 3D city model with CityGML, and the Net Zero Planner tool developed for the US Department of Defense installations are described in more details.

  13. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8... redetermination processes via an Internet Web site; and (iii) A system that transmits codes to network pharmacies...— (1) A toll-free customer call center that— (i) Is open during usual business hours. (ii) Provides...

  14. Planning Programming Budgeting Systems: PPBS and Education.

    ERIC Educational Resources Information Center

    Katzenbach, Edward L.

    Continuous change in education is requiring educational administrators to plan for the distant future with as much precision as they now do for the immediate future. Recently, major advances in the planning-budgeting process have become available to educators in the form of PPBS. Fiduciary budgets, which have been used in most schools since the…

  15. 41 CFR 101-6.2104 - What are the Administrator's general responsibilities under the Order?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... development, the Administrator, to the extent permitted by law: (1) Uses the State process to determine... officials as early in a program planning cycle as is reasonably feasible to explain specific plans and... submissions; (5) Where State planning and budgeting systems are sufficient and where permitted by law...

  16. 41 CFR 101-6.2104 - What are the Administrator's general responsibilities under the Order?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... development, the Administrator, to the extent permitted by law: (1) Uses the State process to determine... officials as early in a program planning cycle as is reasonably feasible to explain specific plans and... submissions; (5) Where State planning and budgeting systems are sufficient and where permitted by law...

  17. 41 CFR 101-6.2104 - What are the Administrator's general responsibilities under the Order?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... development, the Administrator, to the extent permitted by law: (1) Uses the State process to determine... officials as early in a program planning cycle as is reasonably feasible to explain specific plans and... submissions; (5) Where State planning and budgeting systems are sufficient and where permitted by law...

  18. 41 CFR 101-6.2104 - What are the Administrator's general responsibilities under the Order?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... development, the Administrator, to the extent permitted by law: (1) Uses the State process to determine... officials as early in a program planning cycle as is reasonably feasible to explain specific plans and... submissions; (5) Where State planning and budgeting systems are sufficient and where permitted by law...

  19. Manpower Goals Planning and Accountability. Research Report 34.

    ERIC Educational Resources Information Center

    Niehaus, R. J.; Nitterhouse, D.

    Based on previous application of goal programming models to manpower goals planning for large organizations, this paper structures the extensions from the planning process to the operations and control aspects of the management cycle. Emphasis is on the accountability necessary to make such a system an effective management control tool. In order…

  20. Integrating environment into land-use planning through strategic environmental assessment in China: Towards legal frameworks and operational procedures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tao Tang; Tan Zhu; He Xu

    China currently put forwards 'striving to build an environmentally friendly society' as one of the most important development goals. The land administration authorities are facing the challenge of effectively incorporating environment considerations into their planning system. This paper aims to investigate why and how Strategic Environmental Assessment (SEA) is enacted as an effective tool to integrate the environment into land-use planning during the construction process of an environmentally friendly society in China, and identify factors that influence the integration. It presents characteristics of the land-use planning system, and reviews the progress and current state of SEA in China. Results showmore » that SEA provides many benefits in promoting environmental considerations into the land-use planning process. The legal frameworks and operational procedures, in the context of land-use master planning SEA, are summarized and an assessment made of their effectiveness. Some barriers are highlighted through examination of the latest case studies, and several recommendations are presented to overcome these obstacles.« less

  1. Engineered Barrier System: Physical and Chemical Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    P. Dixon

    2004-04-26

    The conceptual and predictive models documented in this Engineered Barrier System: Physical and Chemical Environment Model report describe the evolution of the physical and chemical conditions within the waste emplacement drifts of the repository. The modeling approaches and model output data will be used in the total system performance assessment (TSPA-LA) to assess the performance of the engineered barrier system and the waste form. These models evaluate the range of potential water compositions within the emplacement drifts, resulting from the interaction of introduced materials and minerals in dust with water seeping into the drifts and with aqueous solutions forming bymore » deliquescence of dust (as influenced by atmospheric conditions), and from thermal-hydrological-chemical (THC) processes in the drift. These models also consider the uncertainty and variability in water chemistry inside the drift and the compositions of introduced materials within the drift. This report develops and documents a set of process- and abstraction-level models that constitute the engineered barrier system: physical and chemical environment model. Where possible, these models use information directly from other process model reports as input, which promotes integration among process models used for total system performance assessment. Specific tasks and activities of modeling the physical and chemical environment are included in the technical work plan ''Technical Work Plan for: In-Drift Geochemistry Modeling'' (BSC 2004 [DIRS 166519]). As described in the technical work plan, the development of this report is coordinated with the development of other engineered barrier system analysis model reports.« less

  2. Overview and example application of the Landscape Treatment Designer

    Treesearch

    Alan A. Ager; Nicole M. Vaillant; David E. Owens; Stuart Brittain; Jeff Hamann

    2012-01-01

    The Landscape Treatment Designer (LTD) is a multicriteria spatial prioritization and optimization system to help design and explore landscape fuel treatment scenarios. The program fills a gap between fire model programs such as FlamMap, and planning systems such as ArcFuels, in the fuel treatment planning process. The LTD uses inputs on spatial treatment objectives,...

  3. 49 CFR 611.7 - Relation to planning and project development processes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (ii) Two years after the project opens for revenue service, the grantee shall collect the “after” data... the project. (i) The plan shall provide for: Collection of “before” data on the current transit system... project; collection of “after” data on the transit system two years after opening of the new start project...

  4. Designing a Strategic Plan through an Emerging Knowledge Generation Process: The ATM Experience

    ERIC Educational Resources Information Center

    Zanotti, Francesco

    2012-01-01

    Purpose: The aim of this contribution is to describe a new methodology for designing strategic plans and how it was implemented by ATM, a public transportation agency based in Milan, Italy. Design/methodology/approach: This methodology is founded on a new system theory, called "quantum systemics". It is based on models and metaphors both…

  5. Exploring Type and Amount of Parent Talk during Individualized Family Service Plan Meetings

    ERIC Educational Resources Information Center

    Ridgley, Robyn; Snyder, Patricia; McWilliam, R. A.

    2014-01-01

    We discuss the utility of a coding system designed to evaluate the amount and type of parent talk during individualized family service plan (IFSP) meetings. The iterative processes used to develop the "Parent Communication Coding System" (PCCS) and its associated codes are described. In addition, we explored whether PCCS codes could be…

  6. Improving the Way Higher Education Institutions Study Themselves: Use and Impact of Academic Improvement Systems. Professional File. Number 118, Fall 2010

    ERIC Educational Resources Information Center

    Bender, Kim K.; Jonson, Jessica L.; Siller, Thomas J.

    2010-01-01

    Can higher education institutions continue using planning and self-evaluation processes that are decades old without any reform? Several recent monographs urge institutions to embrace continuous improvement processes that engage systematic planning and department self-evaluation across whole campuses, but they do not show institutions how to do…

  7. Evaluation of an artificial intelligence guided inverse planning system: clinical case study.

    PubMed

    Yan, Hui; Yin, Fang-Fang; Willett, Christopher

    2007-04-01

    An artificial intelligence (AI) guided method for parameter adjustment of inverse planning was implemented on a commercial inverse treatment planning system. For evaluation purpose, four typical clinical cases were tested and the results from both plans achieved by automated and manual methods were compared. The procedure of parameter adjustment mainly consists of three major loops. Each loop is in charge of modifying parameters of one category, which is carried out by a specially customized fuzzy inference system. A physician prescribed multiple constraints for a selected volume were adopted to account for the tradeoff between prescription dose to the PTV and dose-volume constraints for critical organs. The searching process for an optimal parameter combination began with the first constraint, and proceeds to the next until a plan with acceptable dose was achieved. The initial setup of the plan parameters was the same for each case and was adjusted independently by both manual and automated methods. After the parameters of one category were updated, the intensity maps of all fields were re-optimized and the plan dose was subsequently re-calculated. When final plan arrived, the dose statistics were calculated from both plans and compared. For planned target volume (PTV), the dose for 95% volume is up to 10% higher in plans using the automated method than those using the manual method. For critical organs, an average decrease of the plan dose was achieved. However, the automated method cannot improve the plan dose for some critical organs due to limitations of the inference rules currently employed. For normal tissue, there was no significant difference between plan doses achieved by either automated or manual method. With the application of AI-guided method, the basic parameter adjustment task can be accomplished automatically and a comparable plan dose was achieved in comparison with that achieved by the manual method. Future improvements to incorporate case-specific inference rules are essential to fully automate the inverse planning process.

  8. Safe teleoperation based on flexible intraoperative planning for robot-assisted laser microsurgery.

    PubMed

    Mattos, Leonardo S; Caldwell, Darwin G

    2012-01-01

    This paper describes a new intraoperative planning system created to improve precision and safety in teleoperated laser microsurgeries. It addresses major safety issues related to real-time control of a surgical laser during teleoperated procedures, which are related to the reliability and robustness of the telecommunication channels. Here, a safe solution is presented, consisting in a new planning system architecture that maintains the flexibility and benefits of real-time teleoperation and keeps the surgeon in control of all surgical actions. The developed system is based on our virtual scalpel system for robot-assisted laser microsurgery, and allows the intuitive use of stylus to create surgical plans directly over live video of the surgical field. In this case, surgical plans are defined as graphic objects overlaid on the live video, which can be easily modified or replaced as needed, and which are transmitted to the main surgical system controller for subsequent safe execution. In the process of improving safety, this new planning system also resulted in improved laser aiming precision and improved capability for higher quality laser procedures, both due to the new surgical plan execution module, which allows very fast and precise laser aiming control. Experimental results presented herein show that, in addition to the safety improvements, the new planning system resulted in a 48% improvement in laser aiming precision when compared to the previous virtual scalpel system.

  9. Study on Mine Emergency Mechanism based on TARP and ICS

    NASA Astrophysics Data System (ADS)

    Xi, Jian; Wu, Zongzhi

    2018-01-01

    By analyzing the experiences and practices of mine emergency in China and abroad, especially the United States and Australia, normative principle, risk management principle and adaptability principle of constructing mine emergency mechanism based on Trigger Action Response Plans (TARP) and Incident Command System (ICS) are summarized. Classification method, framework, flow and subject of TARP and ICS which are suitable for the actual situation of domestic mine emergency are proposed. The system dynamics model of TARP and ICS is established. The parameters such as evacuation ratio, response rate, per capita emergency capability and entry rate of rescuers are set up. By simulating the operation process of TARP and ICS, the impact of these parameters on the emergency process are analyzed, which could provide a reference and basis for building emergency capacity, formulating emergency plans and setting up action plans in the emergency process.

  10. Mono-stereo-autostereo: the evolution of 3-dimensional neurosurgical planning.

    PubMed

    Stadie, Axel T; Kockro, Ralf A

    2013-01-01

    In the past decade, surgery planning has changed significantly. The main reason is the improvements in computer graphical rendering power and display technology, which turned the plain graphics of the mid-1990s into interactive stereoscopic objects. To report our experiences with 2 virtual reality systems used for planning neurosurgical operations. A series of 208 operations were planned with the Dextroscope (Bracco AMT, Singapore) requiring the use of liquid crystal display shutter glasses. The participating neurosurgeons answered a questionnaire after the planning procedure and postoperatively. In a second prospective series of 33 patients, we used an autostereoscopic monitor system (MD20-3-D; Setred SA, Sweden) to plan intracranial operations. A questionnaire regarding the value of surgery planning was answered preoperatively and postoperatively. The Dextroscope could be integrated into daily surgical routine. Surgeons regarded their understanding of the pathoanatomical situation as improved, leading to enhanced intraoperative orientation and confidence compared with conventional planning. The autostereoscopic Setred system was regarded as helpful in establishing the surgical strategy and analyzing the pathoanatomical situation compared with conventional planning. Both systems were perceived as a backup in case of failure of the standard navigation system. Improvement of display and interaction techniques adds to the realism of the planning process and enables precise structural understanding preoperatively. This minimizes intraoperative guesswork and exploratory dissection. Autostereoscopic display techniques will further increase the value and acceptance of 3-dimensional planning and intraoperative navigation.

  11. Nonterrestrial material processing and manufacturing of large space systems

    NASA Technical Reports Server (NTRS)

    Vontiesenhausen, G. F.

    1978-01-01

    An attempt is made to provide pertinent and readily usable information on the extraterrestrial processing of materials and manufacturing of components and elements of these planned large space systems from preprocessed lunar materials which are made available at a processing and manufacturing site in space. Required facilities, equipment, machinery, energy and manpower are defined.

  12. The Warning System in Disaster Situations: A Selective Analysis.

    DTIC Science & Technology

    DISASTERS, *WARNING SYSTEMS), CIVIL DEFENSE, SOCIAL PSYCHOLOGY, REACTION(PSYCHOLOGY), FACTOR ANALYSIS, CLASSIFICATION, STATISTICAL DATA, TIME ... MANAGEMENT PLANNING AND CONTROL, DAMAGE, CONTROL SYSTEMS, THREAT EVALUATION, DECISION MAKING, DATA PROCESSING, COMMUNICATION SYSTEMS, NUCLEAR EXPLOSIONS

  13. Modeling efficiency at the process level: an examination of the care planning process in nursing homes.

    PubMed

    Lee, Robert H; Bott, Marjorie J; Gajewski, Byron; Taunton, Roma Lee

    2009-02-01

    To examine the efficiency of the care planning process in nursing homes. We collected detailed primary data about the care planning process for a stratified random sample of 107 nursing homes from Kansas and Missouri. We used these data to calculate the average direct cost per care plan and used data on selected deficiencies from the Online Survey Certification and Reporting System to measure the quality of care planning. We then analyzed the efficiency of the assessment process using corrected ordinary least squares (COLS) and data envelopment analysis (DEA). Both approaches suggested that there was considerable inefficiency in the care planning process. The average COLS score was 0.43; the average DEA score was 0.48. The correlation between the two sets of scores was quite high, and there was no indication that lower costs resulted in lower quality. For-profit facilities were significantly more efficient than not-for-profit facilities. Multiple studies of nursing homes have found evidence of inefficiency, but virtually all have had measurement problems that raise questions about the results. This analysis, which focuses on a process with much simpler measurement issues, finds evidence of inefficiency that is largely consistent with earlier studies. Making nursing homes more efficient merits closer attention as a strategy for improving care. Increasing efficiency by adopting well-designed, reliable processes can simultaneously reduce costs and improve quality.

  14. Parallel plan execution with self-processing networks

    NASA Technical Reports Server (NTRS)

    Dautrechy, C. Lynne; Reggia, James A.

    1989-01-01

    A critical issue for space operations is how to develop and apply advanced automation techniques to reduce the cost and complexity of working in space. In this context, it is important to examine how recent advances in self-processing networks can be applied for planning and scheduling tasks. For this reason, the feasibility of applying self-processing network models to a variety of planning and control problems relevant to spacecraft activities is being explored. Goals are to demonstrate that self-processing methods are applicable to these problems, and that MIRRORS/II, a general purpose software environment for implementing self-processing models, is sufficiently robust to support development of a wide range of application prototypes. Using MIRRORS/II and marker passing modelling techniques, a model of the execution of a Spaceworld plan was implemented. This is a simplified model of the Voyager spacecraft which photographed Jupiter, Saturn, and their satellites. It is shown that plan execution, a task usually solved using traditional artificial intelligence (AI) techniques, can be accomplished using a self-processing network. The fact that self-processing networks were applied to other space-related tasks, in addition to the one discussed here, demonstrates the general applicability of this approach to planning and control problems relevant to spacecraft activities. It is also demonstrated that MIRRORS/II is a powerful environment for the development and evaluation of self-processing systems.

  15. Matrix evaluation of science objectives

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.

    1994-01-01

    The most fundamental objective of all robotic planetary spacecraft is to return science data. To accomplish this, a spacecraft is fabricated and built, software is planned and coded, and a ground system is designed and implemented. However, the quantitative analysis required to determine how the collection of science data drives ground system capabilities has received very little attention. This paper defines a process by which science objectives can be quantitatively evaluated. By applying it to the Cassini Mission to Saturn, this paper further illustrates the power of this technique. The results show which science objectives drive specific ground system capabilities. In addition, this process can assist system engineers and scientists in the selection of the science payload during pre-project mission planning; ground system designers during ground system development and implementation; and operations personnel during mission operations.

  16. Health Workforce Planning

    PubMed Central

    Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M.

    2015-01-01

    In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested. PMID:25685381

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    KIRKBRIDE, R.A.

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.

  18. Using ERP and WfM Systems for Implementing Business Processes: An Empirical Study

    NASA Astrophysics Data System (ADS)

    Aversano, Lerina; Tortorella, Maria

    Software systems mainly considered from enterprises for dealing with a business process automation belong to the following two categories: Workflow Management Systems (WfMS) and Enterprise Resource Planning (ERP) systems. The wider diffusion of ERP systems tends to favourite this solution, but there are several limitations of most ERP systems for automating business processes. This paper reports an empirical study aiming at comparing the ability of implementing business processes of ERP systems and WfMSs. Two different case studies have been considered in the empirical study. It evaluates and analyses the correctness and completeness of the process models implemented by using ERP and WfM systems.

  19. ATIPS: Automatic Travel Itinerary Planning System for Domestic Areas

    PubMed Central

    2016-01-01

    Leisure travel has become a topic of great interest to Taiwanese residents in recent years. Most residents expect to be able to relax on a vacation during the holidays; however, the complicated procedure of travel itinerary planning is often discouraging and leads them to abandon the idea of traveling. In this paper, we design an automatic travel itinerary planning system for the domestic area (ATIPS) using an algorithm to automatically plan a domestic travel itinerary based on user intentions that allows users to minimize the process of trip planning. Simply by entering the travel time, the departure point, and the destination location, the system can automatically generate a travel itinerary. According to the results of the experiments, 70% of users were satisfied with the result of our system, and 82% of users were satisfied with the automatic user preference learning mechanism of ATIPS. Our algorithm also provides a framework for substituting modules or weights and offers a new method for travel planning. PMID:26839529

  20. ATIPS: Automatic Travel Itinerary Planning System for Domestic Areas.

    PubMed

    Chang, Hsien-Tsung; Chang, Yi-Ming; Tsai, Meng-Tze

    2016-01-01

    Leisure travel has become a topic of great interest to Taiwanese residents in recent years. Most residents expect to be able to relax on a vacation during the holidays; however, the complicated procedure of travel itinerary planning is often discouraging and leads them to abandon the idea of traveling. In this paper, we design an automatic travel itinerary planning system for the domestic area (ATIPS) using an algorithm to automatically plan a domestic travel itinerary based on user intentions that allows users to minimize the process of trip planning. Simply by entering the travel time, the departure point, and the destination location, the system can automatically generate a travel itinerary. According to the results of the experiments, 70% of users were satisfied with the result of our system, and 82% of users were satisfied with the automatic user preference learning mechanism of ATIPS. Our algorithm also provides a framework for substituting modules or weights and offers a new method for travel planning.

  1. Intelligent control and adaptive systems; Proceedings of the Meeting, Philadelphia, PA, Nov. 7, 8, 1989

    NASA Technical Reports Server (NTRS)

    Rodriguez, Guillermo (Editor)

    1990-01-01

    Various papers on intelligent control and adaptive systems are presented. Individual topics addressed include: control architecture for a Mars walking vehicle, representation for error detection and recovery in robot task plans, real-time operating system for robots, execution monitoring of a mobile robot system, statistical mechanics models for motion and force planning, global kinematics for manipulator planning and control, exploration of unknown mechanical assemblies through manipulation, low-level representations for robot vision, harmonic functions for robot path construction, simulation of dual behavior of an autonomous system. Also discussed are: control framework for hand-arm coordination, neural network approach to multivehicle navigation, electronic neural networks for global optimization, neural network for L1 norm linear regression, planning for assembly with robot hands, neural networks in dynamical systems, control design with iterative learning, improved fuzzy process control of spacecraft autonomous rendezvous using a genetic algorithm.

  2. Operator-assisted planning and execution of proximity operations subject to operational constraints

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1991-01-01

    Future multi-vehicle operations will involve multiple scenarios that will require a planning tool for the rapid, interactive creation of fuel-efficient trajectories. The planning process must deal with higher-order, non-linear processes involving dynamics that are often counter-intuitive. The optimization of resulting trajectories can be difficult to envision. An interaction proximity operations planning system is being developed to provide the operator with easily interpreted visual feedback of trajectories and constraints. This system is hosted on an IRIS 4D graphics platform and utilizes the Clohessy-Wiltshire equations. An inverse dynamics algorithm is used to remove non-linearities while the trajectory maneuvers are decoupled and separated in a geometric spreadsheet. The operator has direct control of the position and time of trajectory waypoints to achieve the desired end conditions. Graphics provide the operator with visualization of satisfying operational constraints such as structural clearance, plume impingement, approach velocity limits, and arrival or departure corridors. Primer vector theory is combined with graphical presentation to improve operator understanding of suggested automated system solutions and to allow the operator to review, edit, or provide corrective action to the trajectory plan.

  3. 48 CFR 8.705-3 - Allocation process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Allocation process. 8.705-3 Section 8.705-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition From Nonprofit Agencies Employing People Who...

  4. APGEN Scheduling: 15 Years of Experience in Planning Automation

    NASA Technical Reports Server (NTRS)

    Maldague, Pierre F.; Wissler, Steve; Lenda, Matthew; Finnerty, Daniel

    2014-01-01

    In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.

  5. A key to success: optimizing the planning process

    NASA Astrophysics Data System (ADS)

    Turk, Huseyin; Karakaya, Kamil

    2014-05-01

    By adopting The NATO Strategic Concept Document in 2010, some important changes in the perception of threat and management of crisis were introduced. This new concept, named ''Comprehensive Approach'', includes the precautions of pre-crisis management, applications of crisis-duration management and reconstruction phase of post-intervention management. NATO will be interested in not only the political and military options , but also social, economical and informational aspects of crisis. NATO will take place in all phases of conflict. The conflicts which occur outside the borders of NATO's nations and terrorism are perceived as threat sources for peace and stability. In addition to conventional threats, cyber attacks which threaten network-supported communication systems, preventing applications from accessing to space that will be used in different fields of life. On the other hand, electronic warfare capabilities which can effect us negatively are added to threat list as new threats. In the process in which military is thought as option, a harder planning phase is waiting for NATO's decision makers who struggle for keeping peace and security. Operation planning process which depends on comprehensive approach, contains these steps: Situational awareness of battlefield, evaluation of the military intervention options, orientation, developing an operation plan, reviewing the plan and transition phases.1 To be successful in theater which is always changing with the technological advances, there has to be an accurate and timely planning on the table. So, spending time for planning can be shown as one of the biggest problem. In addition, sustaining situational awareness which is important for the whole operation planning process, technical command and control hitches, human factor, inability to determine the center of gravity of opponent in asymmetrical threat situations can be described as some of the difficulties in operation planning. In this study, a possible air operation planning process is analyzed according to a comprehensive approach. The difficulties of planning are identified. Consequently, for optimizing a decisionmaking process of an air operation, a planning process is identified in a virtual command and control structure.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barbee, D; McCarthy, A; Galavis, P

    Purpose: Errors found during initial physics plan checks frequently require replanning and reprinting, resulting decreased departmental efficiency. Additionally, errors may be missed during physics checks, resulting in potential treatment errors or interruption. This work presents a process control created using the Eclipse Scripting API (ESAPI) enabling dosimetrists and physicists to detect potential errors in the Eclipse treatment planning system prior to performing any plan approvals or printing. Methods: Potential failure modes for five categories were generated based on available ESAPI (v11) patient object properties: Images, Contours, Plans, Beams, and Dose. An Eclipse script plugin (PlanCheck) was written in C# tomore » check errors most frequently observed clinically in each of the categories. The PlanCheck algorithms were devised to check technical aspects of plans, such as deliverability (e.g. minimum EDW MUs), in addition to ensuring that policy and procedures relating to planning were being followed. The effect on clinical workflow efficiency was measured by tracking the plan document error rate and plan revision/retirement rates in the Aria database over monthly intervals. Results: The number of potential failure modes the PlanCheck script is currently capable of checking for in the following categories: Images (6), Contours (7), Plans (8), Beams (17), and Dose (4). Prior to implementation of the PlanCheck plugin, the observed error rates in errored plan documents and revised/retired plans in the Aria database was 20% and 22%, respectively. Error rates were seen to decrease gradually over time as adoption of the script improved. Conclusion: A process control created using the Eclipse scripting API enabled plan checks to occur within the planning system, resulting in reduction in error rates and improved efficiency. Future work includes: initiating full FMEA for planning workflow, extending categories to include additional checks outside of ESAPI via Aria database queries, and eventual automated plan checks.« less

  7. Utility-Scale Photovoltaic Deployment Scenarios of the Western United States: Implications for Solar Energy Zones in Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frew, Bethany; Mai, Trieu; Krishnan, Venkat

    2016-12-01

    In this study, we use the National Renewable Energy Laboratory's (NREL's) Regional Energy Deployment System (ReEDS) capacity expansion model to estimate utility-scale photovoltaic (UPV) deployment trends from present day through 2030. The analysis seeks to inform the U.S. Bureau of Land Management's (BLM's) planning activities related to UPV development on federal lands in Nevada as part of the Resource Management Plan (RMP) revision for the Las Vegas and Pahrump field offices. These planning activities include assessing the demand for new or expanded additional Solar Energy Zones (SEZ), per the process outlined in BLM's Western Solar Plan process.

  8. TRANSPORT PLANNING MODEL FOR WIDE AREA RECYCLING SYSTEM OF INDUSTRIAL WASTE PLASTIC

    NASA Astrophysics Data System (ADS)

    Arai, Yasuhiro; Kawamura, Hisashi; Koizumi, Akira; Mogi, Satoshi

    To date, the majority of industrial waste plastic generated in an urban city has been processed into landfill. However, it is now necessary to actively utilize that plastic as a useful resource to create a recycling society with a low environment influence. In order to construct a reasonable recycling system, it is necessary to address the "transportation problem," which means determining how much industrial waste plastic is to be transported to what location. With the goal of eliminating landfill processing, this study considers a transport planning model for industrial waste plastic applying linear programming. The results of running optimized calculations under given scenarios clarified not only the possibilities for recycle processing in the Metropolitan area, but also the validity of wide area recycling system.

  9. Image-guided endobronchial ultrasound

    NASA Astrophysics Data System (ADS)

    Higgins, William E.; Zang, Xiaonan; Cheirsilp, Ronnarit; Byrnes, Patrick; Kuhlengel, Trevor; Bascom, Rebecca; Toth, Jennifer

    2016-03-01

    Endobronchial ultrasound (EBUS) is now recommended as a standard procedure for in vivo verification of extraluminal diagnostic sites during cancer-staging bronchoscopy. Yet, physicians vary considerably in their skills at using EBUS effectively. Regarding existing bronchoscopy guidance systems, studies have shown their effectiveness in the lung-cancer management process. With such a system, a patient's X-ray computed tomography (CT) scan is used to plan a procedure to regions of interest (ROIs). This plan is then used during follow-on guided bronchoscopy. Recent clinical guidelines for lung cancer, however, also dictate using positron emission tomography (PET) imaging for identifying suspicious ROIs and aiding in the cancer-staging process. While researchers have attempted to use guided bronchoscopy systems in tandem with PET imaging and EBUS, no true EBUS-centric guidance system exists. We now propose a full multimodal image-based methodology for guiding EBUS. The complete methodology involves two components: 1) a procedure planning protocol that gives bronchoscope movements appropriate for live EBUS positioning; and 2) a guidance strategy and associated system graphical user interface (GUI) designed for image-guided EBUS. We present results demonstrating the operation of the system.

  10. The U.S. Federal Radionavigation Plan

    NASA Astrophysics Data System (ADS)

    Shirer, Heywood O.

    The author presents an overview of the 1990 Federal Radionavigation Plan (FRP) policy and a discussion of the status of GPS (Global Positioning System), Loran-C, Omega, VOR/DME (VHF omnidirectional range/distance measuring equipment), VORTAC, TACAN, MLS (Microwave Landing System), ILS (instrument landing systems), Transit, and radiobeacons. The 1990 FRP contains significant changes regarding several of the radionavigation systems. It is concluded that it is difficult at best to ascertain the post-GPS final systems mix of federally provided radionavigation systems. The phase-out dates of other systems in favor of GPS still remain soft. Many uncertainties remain until the capabilities of GPS are verified for all classes of users. The federal radionavigation planning process accommodates such uncertainties, keeping pace with the constantly changing radionavigation user profile and rapid advancements in system technology.

  11. Poster - Thur Eve - 29: Detecting changes in IMRT QA using statistical process control.

    PubMed

    Drever, L; Salomons, G

    2012-07-01

    Statistical process control (SPC) methods were used to analyze 239 measurement based individual IMRT QA events. The selected IMRT QA events were all head and neck (H&N) cases with 70Gy in 35 fractions, and all prostate cases with 76Gy in 38 fractions planned between March 2009 and 2012. The results were used to determine if the tolerance limits currently being used for IMRT QA were able to indicate if the process was under control. The SPC calculations were repeated for IMRT QA of the same type of cases that were planned after the treatment planning system was upgraded from Eclipse version 8.1.18 to version 10.0.39. The initial tolerance limits were found to be acceptable for two of the three metrics tested prior to the upgrade. After the upgrade to the treatment planning system the SPC analysis found that the a priori limits were no longer capable of indicating control for 2 of the 3 metrics analyzed. The changes in the IMRT QA results were clearly identified using SPC, indicating that it is a useful tool for finding changes in the IMRT QA process. Routine application of SPC to IMRT QA results would help to distinguish unintentional trends and changes from the random variation in the IMRT QA results for individual plans. © 2012 American Association of Physicists in Medicine.

  12. Central exclusive production at RHIC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adamczyk, Leszek; Guryn, Włodek; Turnau, Jacek

    The present status and future plans of the physics program of Central Exclusive Production (CEP) at RHIC are described. The measurements are based on the detection of the forward protons from the Double Pomeron Exchange (DPE) process in the Roman Pot system and of the recoil system of charged particles from the DPE process measured in the STAR experiment’s Time Projection Chamber (TPC). The data described here were taken using polarized proton-proton collisions at ps = 200 GeV. The preliminary spectra of two pion and four pion invariant mass reconstructed by STAR TPC in central region of pseudo-rapidity | |more » < 1, are presented. Near future plans to take data with the current system at center-of-mass energy ps = 200 GeV and plans to upgrade the forward proton tagging sys- tem are presented. Also a possible addition of the Roman Pots to the sPHENIX detector is discussed.« less

  13. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  14. Methods and approaches to support Indigenous water planning: An example from the Tiwi Islands, Northern Territory, Australia

    NASA Astrophysics Data System (ADS)

    Hoverman, Suzanne; Ayre, Margaret

    2012-12-01

    SummaryIndigenous land owners of the Tiwi Islands, Northern Territory Australia have begun the first formal freshwater allocation planning process in Australia entirely within Indigenous lands and waterways. The process is managed by the Northern Territory government agency responsible for water planning, the Department of Natural Resources, Environment, The Arts and Sport, in partnership with the Tiwi Land Council, the principal representative body for Tiwi Islanders on matters of land and water management and governance. Participatory planning methods ('tools') were developed to facilitate community participation in Tiwi water planning. The tools, selected for their potential to generate involvement in the planning process needed both to incorporate Indigenous knowledge of water use and management and raise awareness in the Indigenous community of Western science and water resources management. In consultation with the water planner and Tiwi Land Council officers, the researchers selected four main tools to develop, trial and evaluate. Results demonstrate that the tools provided mechanisms which acknowledge traditional management systems, improve community engagement, and build confidence in the water planning process. The researchers found that participatory planning approaches supported Tiwi natural resource management institutions both in determining appropriate institutional arrangements and clarifying roles and responsibilities in the Islands' Water Management Strategy.

  15. Mission Data System Java Edition Version 7

    NASA Technical Reports Server (NTRS)

    Reinholtz, William K.; Wagner, David A.

    2013-01-01

    The Mission Data System framework defines closed-loop control system abstractions from State Analysis including interfaces for state variables, goals, estimators, and controllers that can be adapted to implement a goal-oriented control system. The framework further provides an execution environment that includes a goal scheduler, execution engine, and fault monitor that support the expression of goal network activity plans. Using these frameworks, adapters can build a goal-oriented control system where activity coordination is verified before execution begins (plan time), and continually during execution. Plan failures including violations of safety constraints expressed in the plan can be handled through automatic re-planning. This version optimizes a number of key interfaces and features to minimize dependencies, performance overhead, and improve reliability. Fault diagnosis and real-time projection capabilities are incorporated. This version enhances earlier versions primarily through optimizations and quality improvements that raise the technology readiness level. Goals explicitly constrain system states over explicit time intervals to eliminate ambiguity about intent, as compared to command-oriented control that only implies persistent intent until another command is sent. A goal network scheduling and verification process ensures that all goals in the plan are achievable before starting execution. Goal failures at runtime can be detected (including predicted failures) and handled by adapted response logic. Responses can include plan repairs (try an alternate tactic to achieve the same goal), goal shedding, ignoring the fault, cancelling the plan, or safing the system.

  16. Integrated assessment of urban drainage system under the framework of uncertainty analysis.

    PubMed

    Dong, X; Chen, J; Zeng, S; Zhao, D

    2008-01-01

    Due to a rapid urbanization as well as the presence of large number of aging urban infrastructures in China, the urban drainage system is facing a dual pressure of construction and renovation nationwide. This leads to the need for an integrated assessment when an urban drainage system is under planning or re-design. In this paper, an integrated assessment methodology is proposed based upon the approaches of analytic hierarchy process (AHP), uncertainty analysis, mathematical simulation of urban drainage system and fuzzy assessment. To illustrate this methodology, a case study in Shenzhen City of south China has been implemented to evaluate and compare two different urban drainage system renovation plans, i.e., the distributed plan and the centralized plan. By comparing their water quality impacts, ecological impacts, technological feasibility and economic costs, the integrated performance of the distributed plan is found to be both better and robust. The proposed methodology is also found to be both effective and practical. (c) IWA Publishing 2008.

  17. Critical role of developing national strategic plans as a guide to strengthen laboratory health systems in resource-poor settings.

    PubMed

    Nkengasong, John N; Mesele, Tsehaynesh; Orloff, Sherry; Kebede, Yenew; Fonjungo, Peter N; Timperi, Ralph; Birx, Deborah

    2009-06-01

    Medical laboratory services are an essential, yet often neglected, component of health systems in developing countries. Their central role in public health, disease control and surveillance, and patient management is often poorly recognized by governments and donors. However, medical laboratory services in developing countries can be strengthened by leveraging funding from other sources of HIV/AIDS prevention, care, surveillance, and treatment programs. Strengthening these services will require coordinated efforts by national governments and partners and can be achieved by establishing and implementing national laboratory strategic plans and policies that integrate laboratory systems to combat major infectious diseases. These plans should take into account policy, legal, and regulatory frameworks; the administrative and technical management structure of the laboratories; human resources and retention strategies; laboratory quality management systems; monitoring and evaluation systems; procurement and maintenance of equipment; and laboratory infrastructure enhancement. Several countries have developed or are in the process of developing their laboratory plans, and others, such as Ethiopia, have implemented and evaluated their plan.

  18. Incorporating ITS into corridor planning : Seattle case study

    DOT National Transportation Integrated Search

    1999-08-01

    The goals of this study were to develop a methodology for incorporating Intelligent Transportation Systems (ITS) into the transportation planning process and apply the methodology to estimate ITS costs and benefits for one case study. A major result ...

  19. Entrepreneurial Spirit in Strategic Planning.

    ERIC Educational Resources Information Center

    Riggs, Donald E.

    1987-01-01

    Presents a model which merges the concepts of entrepreneurship with those of strategic planning to create a library management system. Each step of the process, including needs assessment and policy formation, strategy choice and implementation, and evaluation, is described in detail. (CLB)

  20. Incorporating ITS into corridor planning : Seattle case study

    DOT National Transportation Integrated Search

    1999-06-01

    The goals of this study were to develop a methodology for incorporating Intelligent Transportation Systems (ITS) into the transportation planning process and apply the methodology to estimate ITS costs and benefits for one case study. A major result ...

  1. KSC-2014-2028

    NASA Image and Video Library

    2014-04-10

    CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, Trey Carlson, the spaceport's master planner, describes how the Center Planning and Development Directorate CPD is working to help transform Kennedy into a multi-user spaceport through partnerships and resource planning. The event was first of what is planned to be quarterly meetings between NASA's industry partners and representatives of Kennedy's CPD, Safety and Mission Assurance, International Space Station Ground Processing, Chief Financial officer and Ground Processing and Ground Systems Development and Operations directorates. Center Planning and Development is the “front door” for partnerships with NASA’s Kennedy Space Center. Kennedy is now developing the world’s premier spaceport for government and commercial space industries using comprehensive resource planning and partnerships. Photo credit: NASA/Daniel Casper

  2. KSC-2014-2029

    NASA Image and Video Library

    2014-04-10

    CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, Trey Carlson, the spaceport's master planner, describes how the Center Planning and Development Directorate CPD is working to help transform Kennedy into a multi-user spaceport through partnerships and resource planning. The event was first of what is planned to be quarterly meetings between NASA's industry partners and representatives of Kennedy's CPD, Safety and Mission Assurance, International Space Station Ground Processing, Chief Financial officer and Ground Processing and Ground Systems Development and Operations directorates. Center Planning and Development is the “front door” for partnerships with NASA’s Kennedy Space Center. Kennedy is now developing the world’s premier spaceport for government and commercial space industries using comprehensive resource planning and partnerships. Photo credit: NASA/Daniel Casper

  3. Program planning for the community teaching hospital medical library.

    PubMed Central

    McCorkel, J; Cook, V

    1985-01-01

    To respond to the increasing demand for information from medical educators and clinicians and to persuade administrators to purchase the newly available microcomputer library systems, medical librarians in community teaching hospitals may find it useful to engage in intermediate term (for example, five-year) program planning. To increase the probability that the plan which emerges will be implemented, the planning process should fit the organizational nexus. Planning involves needs assessment, prioritized program elements, a written plan, and facilities planning (if applicable), which lead to program implementation. Components of a model program plan are presented. PMID:4027443

  4. Integration Framework of Process Planning based on Resource Independent Operation Summary to Support Collaborative Manufacturing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kulvatunyou, Boonserm; Wysk, Richard A.; Cho, Hyunbo

    2004-06-01

    In today's global manufacturing environment, manufacturing functions are distributed as never before. Design, engineering, fabrication, and assembly of new products are done routinely in many different enterprises scattered around the world. Successful business transactions require the sharing of design and engineering data on an unprecedented scale. This paper describes a framework that facilitates the collaboration of engineering tasks, particularly process planning and analysis, to support such globalized manufacturing activities. The information models of data and the software components that integrate those information models are described. The integration framework uses an Integrated Product and Process Data (IPPD) representation called a Resourcemore » Independent Operation Summary (RIOS) to facilitate the communication of business and manufacturing requirements. Hierarchical process modeling, process planning decomposition and an augmented AND/OR directed graph are used in this representation. The Resource Specific Process Planning (RSPP) module assigns required equipment and tools, selects process parameters, and determines manufacturing costs based on two-level hierarchical RIOS data. The shop floor knowledge (resource and process knowledge) and a hybrid approach (heuristic and linear programming) to linearize the AND/OR graph provide the basis for the planning. Finally, a prototype system is developed and demonstrated with an exemplary part. Java and XML (Extensible Markup Language) are used to ensure software and information portability.« less

  5. Dengue Contingency Planning: From Research to Policy and Practice.

    PubMed

    Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J; Sánchez Tejeda, Gustavo; Lloyd, Linda S; Hakim, Lokman; Bowman, Leigh R; Horstick, Olaf; Coelho, Giovanini

    2016-09-01

    Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan.

  6. 45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...

  7. 45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...

  8. A New Vision for Integrated Breast Care.

    DTIC Science & Technology

    1999-09-01

    management with recommendations for strategic information systems use and overall process improvements. " Wrote the business plan for a physician group... business and marketing plans for physician network expansion. Performed market research and internal operational and strategic analyses. Identified...Berkeley Master of Business Administration (MBA) May 1994 • Concentration: Marketing and Strategic Planning * Event Chairman, MBA Challenge for Charity

  9. Area Community College and Area Vocational School Construction.

    ERIC Educational Resources Information Center

    Iowa State Dept. of Public Instruction, Des Moines.

    The purpose of this guideline is to assist in the planning process, to encourage good school plant design, and to serve as criteria in the evaluation of area community college and area vocational school plans. It is divided into the following five sections--(1) area plant planning, (2) area sites, (3) physical facilities, (4) service systems, and…

  10. Natural resource assessment and decision support tools for bird conservation planning

    Treesearch

    Carl E. Korschgen; Melinda G. Knutson; Timothy J. Fox; Leslie Holland-Bartels; Henry C. Dehaan; Charles H. Theiling; Jason J. Rohweder; Kevin Kenow; Linda E. Leake; Tom Will

    2005-01-01

    We have used a place-based decision support system for several years to identify bird conservation issues relating to the management and planning needs of resource managers. Public and private land managers are constantly seeking better ways to incorporate landscape, species, and habitat relationships into the conservation planning process. The U.S. Fish and Wildlife...

  11. Federal Student Aid (FSA) Five-Year Strategic Plan. FY 2004-2008

    ERIC Educational Resources Information Center

    US Department of Education, 2004

    2004-01-01

    The FSA Five-Year Strategic Plan is a roadmap for FY 2004-2008 that identifies five long-range strategic objectives, tactical short-term goals, and performance management initiatives. In working toward the goals outlined in the plan, FSA will address a number of key challenges, including legacy system migration, business process re-engineering,…

  12. Trend indicators needed for effective recreation planning - a statistical blueprint for the 80's

    Treesearch

    H. Fred Kaiser; George H. Moeller

    1980-01-01

    Here we outline important elements in recreation planning and describe how the process is changing, using Federal land management agencies as our example. We outline some factors that will impact on planning in the 80's, encourage establishment of a system to monitor trends in key factors that influence recreation behavior.

  13. Planning, Management and Evaluation. Advanced Institutional Development Program (AIDP) Two-year College Consortium, Vol. 1, No. 1.

    ERIC Educational Resources Information Center

    McManis, Gerald L.

    The purpose of this manual is to offer assistance to colleges and universities involved with, or interested in, improvement in their fundamental administrative process in a manner compatible with the Planning, Management and Evaluation System (PME) approach articulated by the United States Office of Education. Planning is defined as that…

  14. Guidelines for developing NASA (National Aeronautics and Space Administration) ADP security risk management plans

    NASA Technical Reports Server (NTRS)

    Tompkins, F. G.

    1983-01-01

    This report presents guidance to NASA Computer security officials for developing ADP security risk management plans. The six components of the risk management process are identified and discussed. Guidance is presented on how to manage security risks that have been identified during a risk analysis performed at a data processing facility or during the security evaluation of an application system.

  15. A system to evaluate the scientific quality of biological and restoration objectives using National Wildlife Refuge Comprehensive Conservation Plans as a case study

    USGS Publications Warehouse

    Schroeder, R.L.

    2006-01-01

    It is widely accepted that plans for restoration projects should contain specific, measurable, and science-based objectives to guide restoration efforts. The United States Fish and Wildlife Service (USFWS) is in the process of developing Comprehensive Conservation Plans (CCPs) for more than 500 units in the National Wildlife Refuge System (NWRS). These plans contain objectives for biological and ecosystem restoration efforts on the refuges. Based on USFWS policy, a system was developed to evaluate the scientific quality of such objectives based on three critical factors: (1) Is the objective specific, measurable, achievable, results-oriented, and time-fixed? (2) What is the extent of the rationale that explains the assumptions, logic, and reasoning for the objective? (3) How well was available science used in the development of the objective? The evaluation system scores each factor on a scale of 1 (poor) to 4 (excellent) according to detailed criteria. The biological and restoration objectives from CCPs published as of September 2004 (60 total) were evaluated. The overall average score for all biological and restoration objectives was 1.73. Average scores for each factor were: Factor 1-1.97; Factor 2-1.86; Factor 3-1.38. The overall scores increased from 1997 to 2004. Future restoration efforts may benefit by using this evaluation system during the process of plan development, to ensure that biological and restoration objectives are of the highest scientific quality possible prior to the implementation of restoration plans, and to allow for improved monitoring and adaptive management.

  16. Logistics Force Planner Assistant (Log Planner)

    DTIC Science & Technology

    1989-09-01

    elements. The system is implemented on a MS-DOS based microcomputer, using the "Knowledge Pro’ software tool., 20 DISTRIBUTION/AVAILABILITY OF... service support structure. 3. A microcomputer-based knowledge system was developed and successfully demonstrated. Four modules of information are...combat service support (CSS) units planning process to Army Staff logistics planners. Personnel newly assigned to logistics planning need an

  17. [Design of a HACCP Plan for the Gouda-type cheesemaking process in a milk processing plant].

    PubMed

    Dávila, Jacqueline; Reyes, Genara; Corzo, Otoniel

    2006-03-01

    The Hazard Analysis and Critical Control Point (HACCP) is a preventive and systematic method used to identify, assess and control of the hazards related with raw material, ingredients, processing, marketing and intended consumer in order to assure the safety of the food. The aim of this study was to design a HACCP plan for implementing in a Gouda-type cheese-making process in a dairy processing plant. The used methodology was based in the application of the seven principles of the HACCP, the information from the plant about the compliment of the pre-requisite programs (70-80%), the experience of the HACCP team and the sequence of stages settles down by the COVENIN standard 3802 for implementing the HACCP system. A HACCP plan was proposed with the scope, the selection of HACCP team, the description of the product and the intended use, the flow diagram of the process, the hazard analysis and the control table of the plan with the critical control points (CCP). The following CCP were identified in the process: pasteurization, coagulation and ripening.

  18. Development of an expert planning system for OSSA

    NASA Technical Reports Server (NTRS)

    Groundwater, B.; Lembeck, M. F.; Sarsfield, L.; Diaz, Alphonso

    1988-01-01

    This paper presents concepts related to preliminary work for the development of an expert planning system for NASA's Office for Space Science and Applications (OSSA). The expert system will function as a planner's decision aid in preparing mission plans encompassing sets of proposed OSSA space science initiatives. These plans in turn will be checked against budgetary and technical constraints and tested for constraint violations. Appropriate advice will be generated by the system for making modifications to the plans to bring them in line with the constraints. The OSSA Planning Expert System (OPES) has been designed to function as an integral part of the OSSA mission planning process. It will be able to suggest a best plan, be able to accept and check a user-suggested strawman plan, and should provide a quick response to user request and actions. OPES will be written in the C programming language and have a transparent user interface running under Windows 386 on a Compaq 386/20 machine. The system's sorted knowledge and inference procedures will model the expertise of human planners familiar with the OSSA planning domain. Given mission priorities and budget guidelines, the system first sets the launch dates for each mission. It will check to make sure that planetary launch windows and precursor mission relationships are not violated. Additional levels of constraints will then be considered, checking such things as the availability of a suitable launch vehicle, total mission launch mass required vs. the identified launch mass capability, and the total power required by the payload at its destination vs. the actual power available. System output will be in the form of Gantt charts, spreadsheet hardcopy, and other presentation quality materials detailing the resulting OSSA mission plan.

  19. Route planning in a four-dimensional environment

    NASA Technical Reports Server (NTRS)

    Slack, M. G.; Miller, D. P.

    1987-01-01

    Robots must be able to function in the real world. The real world involves processes and agents that move independently of the actions of the robot, sometimes in an unpredictable manner. A real-time integrated route planning and spatial representation system for planning routes through dynamic domains is presented. The system will find the safest most efficient route through space-time as described by a set of user defined evaluation functions. Because the route planning algorthims is highly parallel and can run on an SIMD machine in O(p) time (p is the length of a path), the system will find real-time paths through unpredictable domains when used in an incremental mode. Spatial representation, an SIMD algorithm for route planning in a dynamic domain, and results from an implementation on a traditional computer architecture are discussed.

  20. Planning in Dynamic and Uncertain Environments

    DTIC Science & Technology

    1994-05-01

    particular, General Electric’s (GE) Tachyon system [2]), and uses the communication software provided in the CPE (in particular, the Cronus and Knet...and gets back information about the world and replanning requests. "* We extended SIPE-2 to interact with GE’s Tachyon system in a loosely coupled...manner. Tachyon is able to process extended temporal constraints for SIPE-2 during planning. They communicate by using the Cronus system in the CPE

  1. An Overview of ANN Application in the Power Industry

    NASA Technical Reports Server (NTRS)

    Niebur, D.

    1995-01-01

    The paper presents a survey on the development and experience with artificial neural net (ANN) applications for electric power systems, with emphasis on operational systems. The organization and constraints of electric utilities are reviewed, motivations for investigating ANN are identified, and a current assessment is given from the experience of 2400 projects using ANN for load forecasting, alarm processing, fault detection, component fault diagnosis, static and dynamic security analysis, system planning, and operation planning.

  2. Software And Systems Engineering Risk Management

    DTIC Science & Technology

    2010-04-01

    RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software

  3. Power Distribution System Planning with GIS Consideration

    NASA Astrophysics Data System (ADS)

    Wattanasophon, Sirichai; Eua-Arporn, Bundhit

    This paper proposes a method for solving radial distribution system planning problems taking into account geographical information. The proposed method can automatically determine appropriate location and size of a substation, routing of feeders, and sizes of conductors while satisfying all constraints, i.e. technical constraints (voltage drop and thermal limit) and geographical constraints (obstacle, existing infrastructure, and high-cost passages). Sequential quadratic programming (SQP) and minimum path algorithm (MPA) are applied to solve the planning problem based on net price value (NPV) consideration. In addition this method integrates planner's experience and optimization process to achieve an appropriate practical solution. The proposed method has been tested with an actual distribution system, from which the results indicate that it can provide satisfactory plans.

  4. Principles of health infrastructure planning in less developed countries.

    PubMed

    Unger, J P; Criel, B

    1995-01-01

    This article proposes a number of key principles for health infrastructure planning, based on a literature review on the one hand, and on a process of internal deduction on the other. The principles discussed are the following: an integrated health system; a thrifty planning of tiers within that health system; a specificity of tiers; a homogeneity of the tiers' structures; a minimum package of activities; a territorial responsibility and/or an explicit and discrete responsibility for a well-defined population; a necessary and sufficient population basis; a partial separation of administrative and public health planning bases; and, finally, rules for a geographical division and integration of non-governmental organizations. The definition of two strategies, primary health care and district health systems, is also revisited.

  5. ADP SYSTEMS ANALYSIS - COMMITTED VS. AVAILABLE MILITARY TRANSPORTATION (LMI T1).

    DTIC Science & Technology

    LOGISTICS , * MANAGEMENT ENGINEERING), (*DATA PROCESSING, LOGISTICS), INFORMATION RETRIEVAL, SYSTEMS ENGINEERING, MILITARY TRANSPORTATION, CARGO VEHICLES, SCHEDULING, COMPUTER PROGRAMMING, MANAGEMENT PLANNING AND CONTROL

  6. V&V Plan for FPGA-based ESF-CCS Using System Engineering Approach.

    NASA Astrophysics Data System (ADS)

    Maerani, Restu; Mayaka, Joyce; El Akrat, Mohamed; Cheon, Jung Jae

    2018-02-01

    Instrumentation and Control (I&C) systems play an important role in maintaining the safety of Nuclear Power Plant (NPP) operation. However, most current I&C safety systems are based on Programmable Logic Controller (PLC) hardware, which is difficult to verify and validate, and is susceptible to software common cause failure. Therefore, a plan for the replacement of the PLC-based safety systems, such as the Engineered Safety Feature - Component Control System (ESF-CCS), with Field Programmable Gate Arrays (FPGA) is needed. By using a systems engineering approach, which ensures traceability in every phase of the life cycle, from system requirements, design implementation to verification and validation, the system development is guaranteed to be in line with the regulatory requirements. The Verification process will ensure that the customer and stakeholder’s needs are satisfied in a high quality, trustworthy, cost efficient and schedule compliant manner throughout a system’s entire life cycle. The benefit of the V&V plan is to ensure that the FPGA based ESF-CCS is correctly built, and to ensure that the measurement of performance indicators has positive feedback that “do we do the right thing” during the re-engineering process of the FPGA based ESF-CCS.

  7. Computer Aided Process Planning for Non-Axisymmetric Deep Drawing Products

    NASA Astrophysics Data System (ADS)

    Park, Dong Hwan; Yarlagadda, Prasad K. D. V.

    2004-06-01

    In general, deep drawing products have various cross-section shapes such as cylindrical, rectangular and non-axisymmetric shapes. The application of the surface area calculation to non-axisymmetric deep drawing process has not been published yet. In this research, a surface area calculation for non-axisymmetric deep drawing products with elliptical shape was constructed for a design of blank shape of deep drawing products by using an AutoLISP function of AutoCAD software. A computer-aided process planning (CAPP) system for rotationally symmetric deep drawing products has been developed. However, the application of the system to non-axisymmetric components has not been reported yet. Thus, the CAPP system for non-axisymmetric deep drawing products with elliptical shape was constructed by using process sequence design. The system developed in this work consists of four modules. The first is recognition of shape module to recognize non-axisymmetric products. The second is a three-dimensional (3-D) modeling module to calculate the surface area for non-axisymmetric products. The third is a blank design module to create an oval-shaped blank with the identical surface area. The forth is a process planning module based on the production rules that play the best important role in an expert system for manufacturing. The production rules are generated and upgraded by interviewing field engineers. Especially, the drawing coefficient, the punch and die radii for elliptical shape products are considered as main design parameters. The suitability of this system was verified by applying to a real deep drawing product. This CAPP system constructed would be very useful to reduce lead-time for manufacturing and improve an accuracy of products.

  8. Strategic deployment plan : intelligent transportation system (ITS) : early deployment study, Kansas City metropolitan bi-state area

    DOT National Transportation Integrated Search

    1997-01-01

    Intelligent transportation systems (ITS) are systems that utilize advanced technologies, including computer, communications and process control technologies, to improve the efficiency and safety of the transportation system. These systems encompass a...

  9. Innovative applications of artificial intelligence

    NASA Astrophysics Data System (ADS)

    Schorr, Herbert; Rappaport, Alain

    Papers concerning applications of artificial intelligence are presented, covering applications in aerospace technology, banking and finance, biotechnology, emergency services, law, media planning, music, the military, operations management, personnel management, retail packaging, and manufacturing assembly and design. Specific topics include Space Shuttle telemetry monitoring, an intelligent training system for Space Shuttle flight controllers, an expert system for the diagnostics of manufacturing equipment, a logistics management system, a cooling systems design assistant, and a knowledge-based integrated circuit design critic. Additional topics include a hydraulic circuit design assistant, the use of a connector assembly specification expert system to harness detailed assembly process knowledge, a mixed initiative approach to airlift planning, naval battle management decision aids, an inventory simulation tool, a peptide synthesis expert system, and a system for planning the discharging and loading of container ships.

  10. Avionics test bed development plan

    NASA Technical Reports Server (NTRS)

    Harris, L. H.; Parks, J. M.; Murdock, C. R.

    1981-01-01

    A development plan for a proposed avionics test bed facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements is presented. A distributed data processing facility that utilizes the current laboratory resources for the test bed development is outlined. Future studies required for implementation, the management system for project control, and the baseline system configuration are defined. A background analysis of the specific hardware system for the preliminary baseline avionics test bed system is included.

  11. R and T report: Goddard Space Flight Center

    NASA Technical Reports Server (NTRS)

    Soffen, Gerald A. (Editor)

    1993-01-01

    The 1993 Research and Technology Report for Goddard Space Flight Center is presented. Research covered areas such as (1) flight projects; (2) space sciences including cosmology, high energy, stars and galaxies, and the solar system; (3) earth sciences including process modeling, hydrology/cryology, atmospheres, biosphere, and solid earth; (4) networks, planning, and information systems including support for mission operations, data distribution, advanced software and systems engineering, and planning/scheduling; and (5) engineering and materials including spacecraft systems, material and testing, optics and photonics and robotics.

  12. Finance and supply management project execution plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  13. What is the Final Verification of Engineering Requirements?

    NASA Technical Reports Server (NTRS)

    Poole, Eric

    2010-01-01

    This slide presentation reviews the process of development through the final verification of engineering requirements. The definition of the requirements is driven by basic needs, and should be reviewed by both the supplier and the customer. All involved need to agree upon a formal requirements including changes to the original requirements document. After the requirements have ben developed, the engineering team begins to design the system. The final design is reviewed by other organizations. The final operational system must satisfy the original requirements, though many verifications should be performed during the process. The verification methods that are used are test, inspection, analysis and demonstration. The plan for verification should be created once the system requirements are documented. The plan should include assurances that every requirement is formally verified, that the methods and the responsible organizations are specified, and that the plan is reviewed by all parties. The options of having the engineering team involved in all phases of the development as opposed to having some other organization continue the process once the design has been complete is discussed.

  14. Minimal-effort planning of active alignment processes for beam-shaping optics

    NASA Astrophysics Data System (ADS)

    Haag, Sebastian; Schranner, Matthias; Müller, Tobias; Zontar, Daniel; Schlette, Christian; Losch, Daniel; Brecher, Christian; Roßmann, Jürgen

    2015-03-01

    In science and industry, the alignment of beam-shaping optics is usually a manual procedure. Many industrial applications utilizing beam-shaping optical systems require more scalable production solutions and therefore effort has been invested in research regarding the automation of optics assembly. In previous works, the authors and other researchers have proven the feasibility of automated alignment of beam-shaping optics such as collimation lenses or homogenization optics. Nevertheless, the planning efforts as well as additional knowledge from the fields of automation and control required for such alignment processes are immense. This paper presents a novel approach of planning active alignment processes of beam-shaping optics with the focus of minimizing the planning efforts for active alignment. The approach utilizes optical simulation and the genetic programming paradigm from computer science for automatically extracting features from a simulated data basis with a high correlation coefficient regarding the individual degrees of freedom of alignment. The strategy is capable of finding active alignment strategies that can be executed by an automated assembly system. The paper presents a tool making the algorithm available to end-users and it discusses the results of planning the active alignment of the well-known assembly of a fast-axis collimator. The paper concludes with an outlook on the transferability to other use cases such as application specific intensity distributions which will benefit from reduced planning efforts.

  15. A public health hazard mitigation planning process.

    PubMed

    Griffith, Jennifer M; Kay Carpender, S; Crouch, Jill Artzberger; Quiram, Barbara J

    2014-01-01

    The Texas A&M Health Science Center School of Rural Public Health, a member of the Training and Education Collaborative System Preparedness and Emergency Response Learning Center (TECS-PERLC), has long-standing partnerships with 2 Health Service Regions (Regions) in Texas. TECS-PERLC was contracted by these Regions to address 2 challenges identified in meeting requirements outlined by the Risk-Based Funding Project. First, within Metropolitan Statistical Areas, there is not a formal authoritative structure. Second, preexisting tools and processes did not adequately satisfy requirements to assess public health, medical, and mental health needs and link mitigation strategies to the Public Health Preparedness Capabilities, which provide guidance to prepare for, respond to, and recover from public health incidents. TECS-PERLC, with its partners, developed a framework to interpret and apply results from the Texas Public Health Risk Assessment Tool (TxPHRAT). The 3-phase community engagement-based TxPHRAT Mitigation Planning Process (Mitigation Planning Process) and associated tools facilitated the development of mitigation plans. Tools included (1) profiles interpreting TxPHRAT results and identifying, ranking, and prioritizing hazards and capability gaps; (2) a catalog of intervention strategies and activities linked to hazards and capabilities; and (3) a template to plan, evaluate, and report mitigation planning efforts. The Mitigation Planning Process provided a framework for Regions to successfully address all funding requirements. TECS-PERLC developed more than 60 profiles, cataloged and linked 195 intervention strategies, and developed a template resulting in 20 submitted mitigation plans. A public health-focused, community engagement-based mitigation planning process was developed by TECS-PERLC and successfully implemented by the Regions. The outcomes met all requirements and reinforce the effectiveness of academic practice partnerships and importance of community engagement in mitigation planning. Additional funding has been approved to expand the Mitigation Planning Process to all counties in Texas with local health departments.

  16. Can health feasibly be considered as part of the planning process in Scotland?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Higgins, Martin; Douglas, Margaret; Muirie, Jill

    2005-10-15

    The planning system is significant because of its capacity to determine the quality of the built environment as well as the health, well-being and quality of life of the individuals and communities therein. Development planning is especially important because of the long-term impact of the decisions. This paper was developed in response to increasing recognition amongst HIA practitioners in Scotland of the importance of planning for health. It focuses on the relationship between the planning system in Scotland, specifically the Development Planning element of it, and population health and considers how the health impact assessment (HIA) approach can facilitate andmore » support joint working with planners. In particular, consideration is given to the potential impact of the introduction of Strategic Environmental Assessment (SEA) on the linkages between health, HIA and planning.« less

  17. Trial of an electronic decision support system to facilitate shared decision making in community mental health.

    PubMed

    Woltmann, Emily M; Wilkniss, Sandra M; Teachout, Alexandra; McHugo, Gregory J; Drake, Robert E

    2011-01-01

    Involvement of community mental health consumers in mental health decision making has been consistently associated with improvements in health outcomes. Electronic decision support systems (EDSSs) that support both consumer and provider decision making may be a sustainable way to improve dyadic communication in a field with approximately 50% workforce turnover per year. This study examined the feasibility of such a system and investigated proximal outcomes of the system's performance. A cluster randomized design was used to evaluate an EDSS at three urban community mental health sites. Case managers (N=20) were randomly assigned to the EDSS-supported planning group or to the usual care planning group. Consumers (N=80) were assigned to the same group as their case managers. User satisfaction with the care planning process was assessed for consumers and case managers (possible scores range from 1 to 5, with higher summary scores indicating more satisfaction). Recall of the care plan was assessed for consumers. Linear regression with adjustment for grouping by worker was used to assess satisfaction scores. A Wilcoxon rank-sum test was used to examine knowledge of the care plan. Compared with case managers in the control group, those in the intervention group were significantly more satisfied with the care planning process (mean ± SD score=4.0 ± .5 versus 3.3 ± .5; adjusted p=.01). Compared with consumers in the control group, those in the intervention group had significantly greater recall of their care plans three days after the planning session (mean proportion of plan goals recalled=75% ± 28% versus 57% ± 32%; p=.02). There were no differences between the clients in the intervention and control groups regarding satisfaction. This study demonstrated that clients can build their own care plans and negotiate and revise them with their case managers using an EDSS.

  18. Supporting local planning and budgeting for maternal, neonatal and child health in the Philippines

    PubMed Central

    2013-01-01

    Background Responsibility for planning and delivery of health services in the Philippines is devolved to the local government level. Given the recognised need to strengthen capacity for local planning and budgeting, we implemented Investment Cases (IC) for Maternal, Neonatal and Child Health (MNCH) in three selected sub-national units: two poor, rural provinces and one highly-urbanised city. The IC combines structured problem-solving by local policymakers and planners to identify key health system constraints and strategies to scale-up critical MNCH interventions with a decision-support model to estimate the cost and impact of different scaling-up scenarios. Methods We outline how the initiative was implemented, the aspects that worked well, and the key limitations identified in the sub-national application of this approach. Results Local officials found the structured analysis of health system constraints helpful to identify problems and select locally appropriate strategies. In particular the process was an improvement on standard approaches that focused only on supply-side issues. However, the lack of data available at the local level is a major impediment to planning. While the majority of the strategies recommended by the IC were incorporated into the 2011 plans and budgets in the three study sites, one key strategy in the participating city was subsequently reversed in 2012. Higher level systemic issues are likely to have influenced use of evidence in plans and budgets and implementation of strategies. Conclusions Efforts should be made to improve locally-representative data through routine information systems for planning and monitoring purposes. Even with sound plans and budgets, evidence is only one factor influencing investments in health. Political considerations at a local level and issues related to decentralisation, influence prioritisation and implementation of plans. In addition to the strengthening of capacity at local level, a parallel process at a higher level of government to relieve fund channelling and coordination issues is critical for any evidence-based planning approach to have a significant impact on health service delivery. PMID:23343218

  19. The Pilot Land Data System: Report of the Program Planning Workshops

    NASA Technical Reports Server (NTRS)

    1984-01-01

    An advisory report to be used by NASA in developing a program plan for a Pilot Land Data System (PLDS) was developed. The purpose of the PLDS is to improve the ability of NASA and NASA sponsored researchers to conduct land-related research. The goal of the planning workshops was to provide and coordinate planning and concept development between the land related science and computer science disciplines, to discuss the architecture of the PLDs, requirements for information science technology, and system evaluation. The findings and recommendations of the Working Group are presented. The pilot program establishes a limited scale distributed information system to explore scientific, technical, and management approaches to satisfying the needs of the land science community. The PLDS paves the way for a land data system to improve data access, processing, transfer, and analysis, which land sciences information synthesis occurs on a scale not previously permitted because of limits to data assembly and access.

  20. Situational analysis and future directions of AYUSH: An assessment through 5-year plans of India

    PubMed Central

    Samal, Janmejaya

    2015-01-01

    AYUSH is an acronym for Ayurveda, Yoga and Naturopathy, Unani, Siddha, and Homeopathy. These are the six indigenous systems of medicine practiced in India. A department called Department of Indian System of medicine was created in March 1995 and renamed to AYUSH in November 2003 with a focus to provide increased attention for the development of these systems. Very recently, in 2014, a separate ministry was created under the union Government of India, which is headed by a minister of state. Planning regarding these systems of medicine was a part of 5-year planning process since 1951. Since then many developments have happened in this sector albeit the system was struggling with a great degree of uncertainty at the time of 1st5-year plan. A progressive path of development could be observed since the first to the 12th5-year plan. It was up to the 7thplan the growth was little sluggish and from 8thplan onward the growth took its pace and several innovative development processes could be observed thereafter. The system is gradually progressing ahead with a vision to be a globally accepted system, as envisaged in 11th5-year plan. Currently, AYUSH system is a part of mainstream health system implemented under National Rural Health Mission (NRHM). NRHM came into play in 2005 but implemented at ground level in 2006 and introduced the scheme of “Mainstreaming of AYUSH and revitalization of local health traditions” to strengthen public health services. This scheme is currently in operation in its second phase, since 1stApril 2012, with the 12th5-year plan. The scheme was primarily brought in to operation with three important objectives; choice of treatment system to the patients, strengthen facility functionally and strengthen the implementation of national health programmes, however, in some places it seems to be a forced medical pluralism owing to a top-down approach by the union government without considerable involvement of the concerned community. In this study, the 5-year planning documents have been reviewed, from the 1stplan to 12thplan, to enable reflection and throw some light into the future directions of AYUSH system. PMID:26649240

  1. An architecture for heuristic control of real-time processes

    NASA Technical Reports Server (NTRS)

    Raulefs, P.; Thorndyke, P. W.

    1987-01-01

    Abstract Process management combines complementary approaches of heuristic reasoning and analytical process control. Management of a continuous process requires monitoring the environment and the controlled system, assessing the ongoing situation, developing and revising planned actions, and controlling the execution of the actions. For knowledge-intensive domains, process management entails the potentially time-stressed cooperation among a variety of expert systems. By redesigning a blackboard control architecture in an object-oriented framework, researchers obtain an approach to process management that considerably extends blackboard control mechanisms and overcomes limitations of blackboard systems.

  2. The application test system: Experiences to date and future plans

    NASA Technical Reports Server (NTRS)

    May, G. A.; Ashburn, P.; Hansen, H. L. (Principal Investigator)

    1979-01-01

    The ATS analysis component is presented focusing on methods by which the varied data sources are used by the ATS analyst. Analyst training and initial processing of data is discussed along with short and long plans for the ATS.

  3. Are You Ready for Y2K?

    ERIC Educational Resources Information Center

    Day, C. William

    1999-01-01

    Examines the planning process to identify equipment or systems within an educational facility that could be Y2K sensitive. Discusses developing a contingency plan to prevent operational shutdown. Concluding comments describe a simple Y2K equipment-testing procedure. (GR)

  4. NASA End-to-End Data System /NEEDS/ information adaptive system - Performing image processing onboard the spacecraft

    NASA Technical Reports Server (NTRS)

    Kelly, W. L.; Howle, W. M.; Meredith, B. D.

    1980-01-01

    The Information Adaptive System (IAS) is an element of the NASA End-to-End Data System (NEEDS) Phase II and is focused toward onbaord image processing. Since the IAS is a data preprocessing system which is closely coupled to the sensor system, it serves as a first step in providing a 'Smart' imaging sensor. Some of the functions planned for the IAS include sensor response nonuniformity correction, geometric correction, data set selection, data formatting, packetization, and adaptive system control. The inclusion of these sensor data preprocessing functions onboard the spacecraft will significantly improve the extraction of information from the sensor data in a timely and cost effective manner and provide the opportunity to design sensor systems which can be reconfigured in near real time for optimum performance. The purpose of this paper is to present the preliminary design of the IAS and the plans for its development.

  5. A contemporary view of systems engineering. [definition of system and discussion of systems approach

    NASA Technical Reports Server (NTRS)

    Miles, R. F., Jr.

    1974-01-01

    The concept of a 'system' is defined, and the 'systems approach' is discussed. Four contemporary examples of the systems approach are presented: an operations research project, the planning-programming-budgeting system, an information processing system, and aerospace programs.

  6. Manpower and project planning

    NASA Technical Reports Server (NTRS)

    Johnson, David W.

    1991-01-01

    The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.

  7. Division 1137 property control system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pastor, D.J.

    1982-01-01

    An automated data processing property control system was developed by Mobile and Remote Range Division 1137. This report describes the operation of the system and examines ways of using it in operational planning and control.

  8. Use of business planning methods to monitor global health budgets in Turkmenistan.

    PubMed Central

    Ensor, T.; Amannyazova, B.

    2000-01-01

    After undergoing many changes, the financing of health care in countries of the former Soviet Union is now showing signs of maturing. Soon after the political transition in these countries, the development of insurance systems and fee-for-service payment systems dominated the discussions on health reform. At present there is increasing emphasis on case mix adjusted payments in larger hospitals and on global budgets in smaller district hospitals. The problem is that such systems are often mistrusted for not providing sufficient financial control. At the same time, unless further planned restructuring is introduced, payment systems cannot on their own induce the fundamental change required in the health care system. As described in this article, in Tejen etrap (district), Turkmenistan, prospective business plans, which link planned objectives and activities with financial allocations, provide a framework for setting and monitoring budget expenditure. Plans can be linked to the overall objectives of the restructuring system and can be used to ensure sound financial management. The process of business planning, which calls for a major change in the way health facilities examine their activities, can be used as a vehicle to increase awareness of management issues. It also provides a way of satisfying the requirement for a rigorous, bottom-up planning of financial resources. PMID:10994288

  9. [Bone drilling simulation by three-dimensional imaging].

    PubMed

    Suto, Y; Furuhata, K; Kojima, T; Kurokawa, T; Kobayashi, M

    1989-06-01

    The three-dimensional display technique has a wide range of medical applications. Pre-operative planning is one typical application: in orthopedic surgery, three-dimensional image processing has been used very successfully. We have employed this technique in pre-operative planning for orthopedic surgery, and have developed a simulation system for bone-drilling. Positive results were obtained by pre-operative rehearsal; when a region of interest is indicated by means of a mouse on the three-dimensional image displayed on the CRT, the corresponding region appears on the slice image which is displayed simultaneously. Consequently, the status of the bone-drilling is constantly monitored. In developing this system, we have placed emphasis on the quality of the reconstructed three-dimensional images, on fast processing, and on the easy operation of the surgical planning simulation.

  10. A knowledge based expert system for propellant system monitoring at the Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Jamieson, J. R.; Delaune, C.; Scarl, E.

    1985-01-01

    The Lox Expert System (LES) is the first attempt to build a realtime expert system capable of simulating the thought processes of NASA system engineers, with regard to fluids systems analysis and troubleshooting. An overview of the hardware and software describes the techniques used, and possible applications to other process control systems. LES is now in the advanced development stage, with a full implementation planned for late 1985.

  11. SU-E-T-201: Safety-Focused Customization of Treatment Plan Documentation.

    PubMed

    Schubert, L; Westerly, D; Stuhr, K; Miften, M

    2012-06-01

    Plan report documentation contains numerous details about the treatment plan, but critical information for patient safety is often presented without special emphasis. This can make it difficult to detect errors from treatment planning and data transfer during the initial chart review. The objective of this work is to improve safety measures in radiation therapy practice by customizing the treatment plan report to emphasize safety-critical information. Commands within the template file from a commercial planning system (Eclipse, Varian Medical Systems) that automatically generates the treatment plan report were reviewed and modified. Safety-critical plan parameters were identified from published risks known to be inherent in the treatment planning process. Risks having medium to high potential impact on patient safety included incorrect patient identifiers, erroneous use of the treatment prescription, and incorrect transfer of beam parameters or consideration of accessories. Specific examples of critical information in the treatment plan report that can be overlooked during a chart review included prescribed dose per fraction and number of fractions, wedge and open field monitor units, presence of beam accessories, and table shifts for patient setup. Critical information was streamlined and concentrated. Patient and plan identification, dose prescription details, and patient positioning couch shift instructions were placed on the first page. Plan information to verify the correct data transfer to the record and verify system was re-organized in an easy to review tabular format and placed in the second page of the customized printout. Placeholders were introduced to indicate both the presence and absence of beam modifiers. Font sizes and spacing were adjusted for clarity, and departmental standards and terminology were introduced to streamline data communication among staff members. Plan reporting documentation has been customized to concentrate and emphasize safety-critical information, which should allow for a more efficient, robust chart review process. © 2012 American Association of Physicists in Medicine.

  12. Challenges in building intelligent systems for space mission operations

    NASA Technical Reports Server (NTRS)

    Hartman, Wayne

    1991-01-01

    The purpose here is to provide a top-level look at the stewardship functions performed in space operations, and to identify the major issues and challenges that must be addressed to build intelligent systems that can realistically support operations functions. The focus is on decision support activities involving monitoring, state assessment, goal generation, plan generation, and plan execution. The bottom line is that problem solving in the space operations domain is a very complex process. A variety of knowledge constructs, representations, and reasoning processes are necessary to support effective human problem solving. Emulating these kinds of capabilities in intelligent systems offers major technical challenges that the artificial intelligence community is only beginning to address.

  13. Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

  14. Electronic Nursing Documentation: Patient Care Continuity Using the Clinical Care Classification System (CCC).

    PubMed

    Whittenburg, Luann; Meetim, Aunchisa

    2016-01-01

    An innovative nursing documentation project conducted at Bumrungrad International Hospital in Bangkok, Thailand demonstrated patient care continuity between nursing patient assessments and nursing Plans of Care using the Clinical Care Classification System (CCC). The project developed a new generation of interactive nursing Plans of Care using the six steps of the American Nurses Association (ANA) Nursing process and the MEDCIN® clinical knowledgebase to present CCC coded concepts as a natural by-product of a nurse's documentation process. The MEDCIN® clinical knowledgebase is a standardized point-of-care terminology intended for use in electronic health record systems. The CCC is an ANA recognized nursing terminology.

  15. Process Correlation Analysis Model for Process Improvement Identification

    PubMed Central

    Park, Sooyong

    2014-01-01

    Software process improvement aims at improving the development process of software systems. It is initiated by process assessment identifying strengths and weaknesses and based on the findings, improvement plans are developed. In general, a process reference model (e.g., CMMI) is used throughout the process of software process improvement as the base. CMMI defines a set of process areas involved in software development and what to be carried out in process areas in terms of goals and practices. Process areas and their elements (goals and practices) are often correlated due to the iterative nature of software development process. However, in the current practice, correlations of process elements are often overlooked in the development of an improvement plan, which diminishes the efficiency of the plan. This is mainly attributed to significant efforts and the lack of required expertise. In this paper, we present a process correlation analysis model that helps identify correlations of process elements from the results of process assessment. This model is defined based on CMMI and empirical data of improvement practices. We evaluate the model using industrial data. PMID:24977170

  16. Process correlation analysis model for process improvement identification.

    PubMed

    Choi, Su-jin; Kim, Dae-Kyoo; Park, Sooyong

    2014-01-01

    Software process improvement aims at improving the development process of software systems. It is initiated by process assessment identifying strengths and weaknesses and based on the findings, improvement plans are developed. In general, a process reference model (e.g., CMMI) is used throughout the process of software process improvement as the base. CMMI defines a set of process areas involved in software development and what to be carried out in process areas in terms of goals and practices. Process areas and their elements (goals and practices) are often correlated due to the iterative nature of software development process. However, in the current practice, correlations of process elements are often overlooked in the development of an improvement plan, which diminishes the efficiency of the plan. This is mainly attributed to significant efforts and the lack of required expertise. In this paper, we present a process correlation analysis model that helps identify correlations of process elements from the results of process assessment. This model is defined based on CMMI and empirical data of improvement practices. We evaluate the model using industrial data.

  17. SU-E-T-502: Initial Results of a Comparison of Treatment Plans Produced From Automated Prioritized Planning Method and a Commercial Treatment Planning System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tiwari, P; Chen, Y; Hong, L

    2015-06-15

    Purpose We developed an automated treatment planning system based on a hierarchical goal programming approach. To demonstrate the feasibility of our method, we report the comparison of prostate treatment plans produced from the automated treatment planning system with those produced by a commercial treatment planning system. Methods In our approach, we prioritized the goals of the optimization, and solved one goal at a time. The purpose of prioritization is to ensure that higher priority dose-volume planning goals are not sacrificed to improve lower priority goals. The algorithm has four steps. The first step optimizes dose to the target structures, whilemore » sparing key sensitive organs from radiation. In the second step, the algorithm finds the best beamlet weight to reduce toxicity risks to normal tissue while holding the objective function achieved in the first step as a constraint, with a small amount of allowed slip. Likewise, the third and fourth steps introduce lower priority normal tissue goals and beam smoothing. We compared with prostate treatment plans from Memorial Sloan Kettering Cancer Center developed using Eclipse, with a prescription dose of 72 Gy. A combination of liear, quadratic, and gEUD objective functions were used with a modified open source solver code (IPOPT). Results Initial plan results on 3 different cases show that the automated planning system is capable of competing or improving on expert-driven eclipse plans. Compared to the Eclipse planning system, the automated system produced up to 26% less mean dose to rectum and 24% less mean dose to bladder while having the same D95 (after matching) to the target. Conclusion We have demonstrated that Pareto optimal treatment plans can be generated automatically without a trial-and-error process. The solver finds an optimal plan for the given patient, as opposed to database-driven approaches that set parameters based on geometry and population modeling.« less

  18. End-of-Life Care Planning in Accountable Care Organizations: Associations with Organizational Characteristics and Capabilities.

    PubMed

    Ahluwalia, Sangeeta C; Harris, Benjamin J; Lewis, Valerie A; Colla, Carrie H

    2018-06-01

    To measure the extent to which accountable care organizations (ACOs) have adopted end-of-life (EOL) care planning processes and characterize those ACOs that have established processes related to EOL. This study uses data from three waves (2012-2015) of the National Survey of ACOs. Respondents were 397 ACOs participating in Medicare, Medicaid, and commercial ACO contracts. This is a cross-sectional survey study using multivariate ordered logit regression models. We measured the extent to which the ACO had adopted EOL care planning processes as well as organizational characteristics, including care management, utilization management, health informatics, and shared decision-making capabilities, palliative care, and patient-centered medical home experience. Twenty-one percent of ACOs had few or no EOL care planning processes, 60 percent had some processes, and 19.6 percent had advanced processes. ACOs with a hospital in their system (OR: 3.07; p = .01), and ACOs with advanced care management (OR: 1.43; p = .02), utilization management (OR: 1.58, p = .00), and shared decision-making capabilities (OR: 16.3, p = .000) were more likely to have EOL care planning processes than those with no hospital or few to no capabilities. There remains considerable room for today's ACOs to increase uptake of EOL care planning, possibly by leveraging existing care management, utilization management, and shared decision-making processes. © Health Research and Educational Trust.

  19. An integrative health information systems approach for facilitating strategic planning in hospitals.

    PubMed

    Killingsworth, Brenda; Newkirk, Henry E; Seeman, Elaine

    2006-01-01

    This article presents a framework for developing strategic information systems (SISs) for hospitals. It proposes a SIS formulation process which incorporates complexity theory, strategic/organizational analysis theory, and conventional MIS development concepts. Within the formulation process, four dimensions of SIS are proposed as well as an implementation plan. A major contribution of this article is the development of a hospital SIS framework which permits an organization to fluidly respond to external, interorganizational, and intraorganizational influences. In addition, this article offers a checklist which managers can utilize in developing an SIS in health care.

  20. Ebola Preparedness Planning and Collaboration by Two Health Systems in Wisconsin, September to December 2014.

    PubMed

    Leonhardt, Kathryn Kraft; Keuler, Megan; Safdar, Nasia; Hunter, Paul

    2016-08-01

    We describe the collaborative approach used by 2 health systems in Wisconsin to plan and prepare for the threat of Ebola virus disease. This was a descriptive study of the preparedness planning, infection prevention, and collaboration with public health agencies undertaken by 2 health systems in Wisconsin between September and December 2014. The preparedness approach used by the 2 health systems relied successfully on their robust infrastructure for planning and infection prevention. In the setting of rapidly evolving guidance and unprecedented fear regarding Ebola, the 2 health systems enhanced their response through collaboration and coordination with each other and government public health agencies. Key lessons learned included the importance of a rigorous planning process, robust infection prevention practices, and coalitions between public and private health sectors. The potential threat of Ebola virus disease stimulated emergency preparedness in which acute care facilities played a leading role in the public health response. Leveraging the existing expertise of health systems is essential when faced with emerging infectious diseases. (Disaster Med Public Health Preparedness. 2016;10:691-697).

  1. Workforce planning and development in times of delivery system transformation.

    PubMed

    Pittman, Patricia; Scully-Russ, Ellen

    2016-09-23

    As implementation of the US Affordable Care Act (ACA) advances, many domestic health systems are considering major changes in how the healthcare workforce is organized. The purpose of this study is to explore the dynamic processes and interactions by which workforce planning and development (WFPD) is evolving in this new environment. Informed by the theory of loosely coupled systems (LCS), we use a case study design to examine how workforce changes are being managed in Kaiser Permanente and Montefiore Health System. We conducted site visits with in-depth interviews with 8 to 10 stakeholders in each organization. Both systems demonstrate a concern for the impact of change on their workforce and have made commitments to avoid outsourcing and layoffs. Central workforce planning mechanisms have been replaced with strategies to integrate various stakeholders and units in alignment with strategic growth plans. Features of this new approach include early and continuous engagement of labor in innovation; the development of intermediary sense-making structures to garner resources, facilitate plans, and build consensus; and a whole system perspective, rather than a focus on single professions. We also identify seven principles underlying the WFPD processes in these two cases that can aid in development of a new and more adaptive workforce strategy in healthcare. Since passage of the ACA, healthcare systems are becoming larger and more complex. Insights from these case studies suggest that while organizational history and structure determined different areas of emphasis, our results indicate that large-scale system transformations in healthcare can be managed in ways that enhance the skills and capacities of the workforce. Our findings merit attention, not just by healthcare administrators and union leaders, but by policymakers and scholars interested in making WFPD policies at a state and national level more responsive.

  2. Collaboration process for integrated social and health care strategy implementation.

    PubMed

    Korpela, Jukka; Elfvengren, Kalle; Kaarna, Tanja; Tepponen, Merja; Tuominen, Markku

    2012-01-01

    To present a collaboration process for creating a roadmap for the implementation of a strategy for integrated health and social care. The developed collaboration process includes multiple phases and uses electronic group decision support system technology (GDSS). A case study done in the South Karelia District of Social and Health Services in Finland during 2010-2011. An expert panel of 13 participants was used in the planning process of the strategy implementation. The participants were interviewed and observed during the case study. As a practical result, a roadmap for integrated health and social care strategy implementation has been developed. The strategic roadmap includes detailed plans of several projects which are needed for successful integration strategy implementation. As an academic result, a collaboration process to create such a roadmap has been developed. The collaboration process and technology seem to suit the planning process well. The participants of the meetings were satisfied with the collaboration process and the GDSS technology. The strategic roadmap was accepted by the participants, which indicates satisfaction with the developed process.

  3. [PASS neurocognitive dysfunction in attention deficit].

    PubMed

    Pérez-Alvarez, F; Timoneda-Gallart, C

    Attention deficit disorder shows both cognitive and behavioral patterns. To determine a particular PASS (planning, attention, successive and simultaneous) pattern in order to early diagnosis and remediation according to PASS theory. 80 patients were selected from the neuropediatric attendance, aged 6 to 12 years old, 55 boys and 25 girls. Inclusion criteria were inattention (80 cases) and inattention with hyperactive symptoms (40 cases) according to the Diagnostic and Statistical Manual (DSM-IV). Exclusion criteria were the criteria of phonologic awareness previously reported, considered useful to diagnose dyslexia. A control group of 300 individuals, aged 5 to 12 years old, was used, criteria above mentioned being controlled. DN:CAS (Das-Naglieri Cognitive Assessment System) battery, translated to native language, was given to assess PASS cognitive processes. Results were analyzed with cluster analysis and t-Student test. Statistical factor analysis of the control group had previously identified the four PASS processes: planning, attention, successive and simultaneous. The dendrogram of the cluster analysis discriminated three categories of attention deficit disorder: 1. The most frequent, with planning deficit; 2. Without planning deficit but with deficit in other processes, and 3. Just only a few cases, without cognitive processing deficit. Cognitive deficiency in terms of means of scores was statistically significant when compared to control group (p = 0.001). According to PASS pattern, planning deficiency is a relevant factor. Neurological planning is not exactly the same than neurological executive function. The behavioral pattern is mainly linked to planning deficiency, but also to other PASS processing deficits and even to no processing deficit.

  4. Optimal Black Start Resource Allocation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Qiu, Feng; Wang, Jianhui; Chen, Chen

    The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. Achieving this goal requires that resource procurement planning takes the restoration process into account. In this study, we integrate the BS resource procurement decision with a restoration planning model and develop an optimization model that produces a minimal cost procurement plan that satisfies the restoration time requirement.

  5. Fall of the Integrated Planning System

    DTIC Science & Technology

    2012-05-17

    operations planning processes. Any service planner can lead the implementation of JOPP because he is familiar with the process and the products . The...discontinued the use of IPS. One can ask, why was IPS withdrawn so soon after its implementation ? This monograph explores the reasons behind the short...IPS raises the question, why was IPS withdrawn so soon after its implementation . This monograph explores the reasons behind the short lifespan of the

  6. Use of image registration and fusion algorithms and techniques in radiotherapy: Report of the AAPM Radiation Therapy Committee Task Group No. 132.

    PubMed

    Brock, Kristy K; Mutic, Sasa; McNutt, Todd R; Li, Hua; Kessler, Marc L

    2017-07-01

    Image registration and fusion algorithms exist in almost every software system that creates or uses images in radiotherapy. Most treatment planning systems support some form of image registration and fusion to allow the use of multimodality and time-series image data and even anatomical atlases to assist in target volume and normal tissue delineation. Treatment delivery systems perform registration and fusion between the planning images and the in-room images acquired during the treatment to assist patient positioning. Advanced applications are beginning to support daily dose assessment and enable adaptive radiotherapy using image registration and fusion to propagate contours and accumulate dose between image data taken over the course of therapy to provide up-to-date estimates of anatomical changes and delivered dose. This information aids in the detection of anatomical and functional changes that might elicit changes in the treatment plan or prescription. As the output of the image registration process is always used as the input of another process for planning or delivery, it is important to understand and communicate the uncertainty associated with the software in general and the result of a specific registration. Unfortunately, there is no standard mathematical formalism to perform this for real-world situations where noise, distortion, and complex anatomical variations can occur. Validation of the software systems performance is also complicated by the lack of documentation available from commercial systems leading to use of these systems in undesirable 'black-box' fashion. In view of this situation and the central role that image registration and fusion play in treatment planning and delivery, the Therapy Physics Committee of the American Association of Physicists in Medicine commissioned Task Group 132 to review current approaches and solutions for image registration (both rigid and deformable) in radiotherapy and to provide recommendations for quality assurance and quality control of these clinical processes. © 2017 American Association of Physicists in Medicine.

  7. Making evolutionary history count: biodiversity planning for coral reef fishes and the conservation of evolutionary processes

    NASA Astrophysics Data System (ADS)

    von der Heyden, Sophie

    2017-03-01

    Anthropogenic activities are having devastating impacts on marine systems with numerous knock-on effects on trophic functioning, species interactions and an accelerated loss of biodiversity. Establishing conservation areas can not only protect biodiversity, but also confer resilience against changes to coral reefs and their inhabitants. Planning for protection and conservation in marine systems is complex, but usually focuses on maintaining levels of biodiversity and protecting special and unique landscape features while avoiding negative impacts to socio-economic benefits. Conversely, the integration of evolutionary processes that have shaped extant species assemblages is rarely taken into account. However, it is as important to protect processes as it is to protect patterns for maintaining the evolutionary trajectories of populations and species. This review focuses on different approaches for integrating genetic analyses, such as phylogenetic diversity, phylogeography and the delineation of management units, temporal and spatial monitoring of genetic diversity and quantification of adaptive variation for protecting evolutionary resilience, into marine spatial planning, specifically for coral reef fishes. Many of these concepts are not yet readily applied to coral reef fish studies, but this synthesis highlights their potential and the importance of including historical processes into systematic biodiversity planning for conserving not only extant, but also future, biodiversity and its evolutionary potential.

  8. Strategic financial analysis: the CFO's role in strategic planning.

    PubMed

    Litos, D M

    1985-03-01

    Strategic financial analysis, the financial information support system for the strategic planning process, provides information vital to maintaining a healthy bottom line. This article, the third in HCSM's series on the organizational components of strategic planning, reviews the role of the chief financial officer in determining which programs and services will best meet the future needs of the institution.

  9. A representation for error detection and recovery in robot task plans

    NASA Technical Reports Server (NTRS)

    Lyons, D. M.; Vijaykumar, R.; Venkataraman, S. T.

    1990-01-01

    A general definition is given of the problem of error detection and recovery in robot assembly systems, and a general representation is developed for dealing with the problem. This invariant representation involves a monitoring process which is concurrent, with one monitor per task plan. A plan hierarchy is discussed, showing how diagnosis and recovery can be handled using the representation.

  10. Strategic planning, implementation, and evaluation processes in hospital systems: a survey from Iran.

    PubMed

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2014-09-28

    Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. All the investigated hospitals had a strategic plan. The obtained percentages for the items "the rate of the compliance to requirements" and "the quantity of planning facilitators" (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved.

  11. Strategic Planning, Implementation, and Evaluation Processes in Hospital Systems: A Survey From Iran

    PubMed Central

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2015-01-01

    Aim & Background: Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. Methods: The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. Results: All the investigated hospitals had a strategic plan. The obtained percentages for the items “the rate of the compliance to requirements” and “the quantity of planning facilitators” (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). Conclusion: According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved. PMID:25716385

  12. Navstar Global Positioning System (GPS) clock program: Present and future

    NASA Technical Reports Server (NTRS)

    Tennant, D. M.

    1981-01-01

    Global Positioning System (GPS) program status are discussed and plans for ensuring the long term continuation of the program are presented. Performance of GPS clocks is presented in terms of on orbit data as portrayed by GPS master control station kalman filter processing. The GPS Clock reliability program is reviewed in depth and future plans fo the overall clock program are published.

  13. Water transportation planning for Eastern Massachusetts : a strategic assessment of passenger ferry services

    DOT National Transportation Integrated Search

    2003-03-01

    A group of existing, proposed, and potential ferry services is the subject of a comprehensive assessment to assist the strategic planning process of the Commonwealth of Massachusetts for its future transportation system. The Volpe Center developed a ...

  14. 75 FR 77652 - Notice of Intent to Prepare a Resource Management Plan for the Battle Mountain District and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... agencies where appropriate. (7) The planning process will use and observe principles of multiple use and..., sociology and economics, and Geographic Information Systems. Authority: 40 CFR 1501.7, 43 CFR 1610.2. Ron...

  15. 45 CFR 205.36 - State plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., of an automated statewide management information system designed effectively and efficiently, to assist management in the administration of an approved AFDC State plan. The submission process to amend... aid or services is changed. (c) To electronically refer and exchange information with programs under...

  16. Family Planning Education and Health Care Delivery in the People's Republic of China: Implications for Educational Alternatives

    ERIC Educational Resources Information Center

    Hawkins, John N.

    1976-01-01

    Explores the process recently employed in China (post-1966) to transfer skills and information related to family planning via a network of alternative educational institutions lodged in the health care delivery system. (Author/RK)

  17. 23 CFR 450.306 - Scope of the metropolitan transportation planning process.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...: (1) Support the economic vitality of the metropolitan area, especially by enabling global...; (7) Promote efficient system management and operation; and (8) Emphasize the preservation of the... transportation operators may apply asset management principles and techniques in establishing planning goals...

  18. 23 CFR 450.306 - Scope of the metropolitan transportation planning process.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...: (1) Support the economic vitality of the metropolitan area, especially by enabling global...; (7) Promote efficient system management and operation; and (8) Emphasize the preservation of the... transportation operators may apply asset management principles and techniques in establishing planning goals...

  19. 23 CFR 450.306 - Scope of the metropolitan transportation planning process.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...: (1) Support the economic vitality of the metropolitan area, especially by enabling global...; (7) Promote efficient system management and operation; and (8) Emphasize the preservation of the... transportation operators may apply asset management principles and techniques in establishing planning goals...

  20. Application of a distributed systems architecture for increased speed in image processing on an autonomous ground vehicle

    NASA Astrophysics Data System (ADS)

    Wright, Adam A.; Momin, Orko; Shin, Young Ho; Shakya, Rahul; Nepal, Kumud; Ahlgren, David J.

    2010-01-01

    This paper presents the application of a distributed systems architecture to an autonomous ground vehicle, Q, that participates in both the autonomous and navigation challenges of the Intelligent Ground Vehicle Competition. In the autonomous challenge the vehicle is required to follow a course, while avoiding obstacles and staying within the course boundaries, which are marked by white lines. For the navigation challenge, the vehicle is required to reach a set of target destinations, known as way points, with given GPS coordinates and avoid obstacles that it encounters in the process. Previously the vehicle utilized a single laptop to execute all processing activities including image processing, sensor interfacing and data processing, path planning and navigation algorithms and motor control. National Instruments' (NI) LabVIEW served as the programming language for software implementation. As an upgrade to last year's design, a NI compact Reconfigurable Input/Output system (cRIO) was incorporated to the system architecture. The cRIO is NI's solution for rapid prototyping that is equipped with a real time processor, an FPGA and modular input/output. Under the current system, the real time processor handles the path planning and navigation algorithms, the FPGA gathers and processes sensor data. This setup leaves the laptop to focus on running the image processing algorithm. Image processing as previously presented by Nepal et. al. is a multi-step line extraction algorithm and constitutes the largest processor load. This distributed approach results in a faster image processing algorithm which was previously Q's bottleneck. Additionally, the path planning and navigation algorithms are executed more reliably on the real time processor due to the deterministic nature of operation. The implementation of this architecture required exploration of various inter-system communication techniques. Data transfer between the laptop and the real time processor using UDP packets was established as the most reliable protocol after testing various options. Improvement can be made to the system by migrating more algorithms to the hardware based FPGA to further speed up the operations of the vehicle.

Top