The Application of Computers to Library Technical Processing
ERIC Educational Resources Information Center
Veaner, Allen B.
1970-01-01
Describes computer applications to acquisitions and technical processing and reports in detail on Stanford's development work in automated technical processing. Author is Assistant Director for Bibliographic Operation, Stanford University Libraries. (JB)
Illinois Occupational Skill Standards: Chemical Process Technical Operators.
ERIC Educational Resources Information Center
Illinois Occupational Skill Standards and Credentialing Council, Carbondale.
This document, which is intended for workforce preparation program providers, details the Illinois Occupational Skill Standards for programs preparing students for employment as chemical process technical operators. The document begins with a brief overview of the Illinois perspective on occupational skill standards and credentialing, the process…
Control of Technology Transfer at JPL
NASA Technical Reports Server (NTRS)
Oliver, Ronald
2006-01-01
Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software
9 CFR 351.14 - Processes to be supervised; extent of examinations.
Code of Federal Regulations, 2010 CFR
2010-01-01
....3 for the preparation of certified technical animal fat and the plant operator, in writing... and technical animal fats, and the plant operator, in writing, certifies that he is maintaining this... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT...
Design and Assessment of an Associate Degree-Level Plant Operations Technical Education Program
NASA Astrophysics Data System (ADS)
Selwitz, Jason Lawrence
Research was undertaken to develop and evaluate an associate degree-level technical education program in Plant Operations oriented towards training students in applied science, technology, engineering, and mathematics (STEM) skills and knowledge relevant to a spectrum of processing industries. This work focuses on four aspects of the curriculum and course development and evaluation research. First, the context of, and impetus for, what was formerly called vocational education, now referred to as technical or workforce education, is provided. Second, the research that was undertaken to design and evaluate an associate degree-level STEM workforce education program is described. Third, the adaptation of a student self-assessment of learning gains instrument is reviewed, and an analysis of the resulting data using an adapted logic model is provided, to evaluate the extent to which instructional approaches, in two process control/improvement-focused courses, were effective in meeting course-level intended learning outcomes. Finally, eight integrative multiscale exercises were designed from two example process systems, wastewater treatment and fast pyrolysis. The integrative exercises are intended for use as tools to accelerate the formation of an operator-technician's multiscale vision of systems, unit operations, underlying processes, and fundamental reactions relevant to multiple industries. Community and technical colleges serve a vital function in STEM education by training workers for medium- and high-skilled technical careers and providing employers the labor necessary to operate and maintain thriving business ventures. Through development of the curricular, course, and assessment-related instruments and tools, this research helps ensure associate degree-level technical education programs can engage in a continual process of program evaluation and improvement.
NASA Technical Reports Server (NTRS)
Ido, Haisam; Burns, Rich
2015-01-01
The NASA Goddard Space Science Mission Operations project (SSMO) is performing a technical cost-benefit analysis for centralizing and consolidating operations of a diverse set of missions into a unified and integrated technical infrastructure. The presentation will focus on the notion of normalizing spacecraft operations processes, workflows, and tools. It will also show the processes of creating a standardized open architecture, creating common security models and implementations, interfaces, services, automations, notifications, alerts, logging, publish, subscribe and middleware capabilities. The presentation will also discuss how to leverage traditional capabilities, along with virtualization, cloud computing services, control groups and containers, and possibly Big Data concepts.
Evaluation of the Hanford 200 West Groundwater Treatment System: Fluidized Bed Bioreactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Looney, Brian B.; Jackson, Dennis G.; Dickson, John O.
A fluidized bed reactor (FBR) in the 200W water treatment facility at Hanford is removing nitrate from groundwater as part of the overall pump-treat-reinject process. Control of the FBR bed solids has proven challenging, impacting equipment, increasing operations and maintenance (O&M), and limiting the throughput of the facility. In response to the operational challenges, the Department of Energy Richland Office (DOE-RL) commissioned a technical assistance team to facilitate a system engineering evaluation and provide focused support recommendations to the Hanford Team. The DOE Environmental Management (EM) technical assistance process is structured to identify and triage technologies and strategies that addressmore » the target problem(s). The process encourages brainstorming and dialog and allows rapid identification and prioritization of possible options. Recognizing that continuous operation of a large-scale FBR is complex, requiring careful attention to system monitoring data and changing conditions, the technical assistance process focused on explicit identification of the available control parameters (“knobs”), how these parameters interact and impact the FBR system, and how these can be adjusted under different scenarios to achieve operational goals. The technical assistance triage process was performed in collaboration with the Hanford team.« less
Morgan, Lauren; New, Steve; Robertson, Eleanor; Collins, Gary; Rivero-Arias, Oliver; Catchpole, Ken; Pickering, Sharon P; Hadi, Mohammed; Griffin, Damian; McCulloch, Peter
2015-02-01
Standard operating procedures (SOPs) should improve safety in the operating theatre, but controlled studies evaluating the effect of staff-led implementation are needed. In a controlled interrupted time series, we evaluated three team process measures (compliance with WHO surgical safety checklist, non-technical skills and technical performance) and three clinical outcome measures (length of hospital stay, complications and readmissions) before and after a 3-month staff-led development of SOPs. Process measures were evaluated by direct observation, using Oxford Non-Technical Skills II for non-technical skills and the 'glitch count' for technical performance. All staff in two orthopaedic operating theatres were trained in the principles of SOPs and then assisted to develop standardised procedures. Staff in a control operating theatre underwent the same observations but received no training. The change in difference between active and control groups was compared before and after the intervention using repeated measures analysis of variance. We observed 50 operations before and 55 after the intervention and analysed clinical data on 1022 and 861 operations, respectively. The staff chose to structure their efforts around revising the 'whiteboard' which documented and prompted tasks, rather than directly addressing specific task problems. Although staff preferred and sustained the new system, we found no significant differences in process or outcome measures before/after intervention in the active versus the control group. There was a secular trend towards worse outcomes in the postintervention period, seen in both active and control theatres. SOPs when developed and introduced by frontline staff do not necessarily improve operative processes or outcomes. The inherent tension in improvement work between giving staff ownership of improvement and maintaining control of direction needs to be managed, to ensure staff are engaged but invest energy in appropriate change. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).
NASA Astrophysics Data System (ADS)
Ariana, I. M.; Bagiada, I. M.
2018-01-01
Development of spreadsheet-based integrated transaction processing systems and financial reporting systems is intended to optimize the capabilities of spreadsheet in accounting data processing. The purpose of this study are: 1) to describe the spreadsheet-based integrated transaction processing systems and financial reporting systems; 2) to test its technical and operational feasibility. This study type is research and development. The main steps of study are: 1) needs analysis (need assessment); 2) developing spreadsheet-based integrated transaction processing systems and financial reporting systems; and 3) testing the feasibility of spreadsheet-based integrated transaction processing systems and financial reporting systems. The technical feasibility include the ability of hardware and operating systems to respond the application of accounting, simplicity and ease of use. Operational feasibility include the ability of users using accounting applications, the ability of accounting applications to produce information, and control applications of the accounting applications. The instrument used to assess the technical and operational feasibility of the systems is the expert perception questionnaire. The instrument uses 4 Likert scale, from 1 (strongly disagree) to 4 (strongly agree). Data were analyzed using percentage analysis by comparing the number of answers within one (1) item by the number of ideal answer within one (1) item. Spreadsheet-based integrated transaction processing systems and financial reporting systems integrate sales, purchases, and cash transaction processing systems to produce financial reports (statement of profit or loss and other comprehensive income, statement of changes in equity, statement of financial position, and statement of cash flows) and other reports. Spreadsheet-based integrated transaction processing systems and financial reporting systems is feasible from the technical aspects (87.50%) and operational aspects (84.17%).
PRODUCTION OF HEAVY WATER SAVANNAH RIVER AND DANA PLANTS. Technical Manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bebbington, W.P.; Thayer, V.R. eds.; Proctor, J.F. comp.
1959-07-01
A summary is presented of the basic technical iniormation that pertains to processes that are used at the Dana and Savannah River Plants for the production of heavy water. The manual is intended primarily for plant operating and technical personnel and was prepared to supplement and provide technical support for detailed operating procedures. Introductory sections contain some background information on the history, uses, available processes, and analytical procedures for heavy water. They also include a general comparison of the design and laserformance of the two plants and an analysis of their differences. The technology of the heavy water separation processesmore » used, namely hydrogen sulfide exchange, distillation of water, and electrolysis is discussed in detail. The manufacture and storage of hydrogen sulfide gas and the process water treatment facilities are also discussed. (auth)« less
The role of NASA for aerospace information
NASA Technical Reports Server (NTRS)
Chandler, G. P., Jr.
1980-01-01
The NASA Scientific and Technical Information Program operations are performed by two contractor operated facilities. The NASA STI Facility, located near Baltimore, Maryland, employs about 210 people who process report literature, operate the computer complex, and provide support for software maintenance and developments. A second contractor, the Technical Information Services of the American Institute of Aeronautics and Astronautics, employs approximately 80 people in New York City and processes the open literature such as journals, magazines, and books. Features of these programs include online access via RECON, announcement services, and international document exchange.
Burlakov, R I; Iurevich, V M
1981-01-01
The authors proved the advisability of complex technical provision for certain functional cycles, or parts of medical technological process. The example given is a modification of working place for anesthesiologist at the operating theatre. Principle and additional devices included in the complex are specified.
Inland Waterway Environmental Safety
NASA Astrophysics Data System (ADS)
Reshnyak, Valery; Sokolov, Sergey; Nyrkov, Anatoliy; Budnik, Vlad
2018-05-01
The article presents the results of development of the main components of the environmental safety when operating vessels on inland waterways, which include strategy selection ensuring the environmental safety of vessels, the selection and justification of a complex of environmental technical means, activities to ensure operation of vessels taking into account the environmental technical means. Measures to ensure environmental safety are developed on the basis of the principles aimed at ensuring environmental safety of vessels. They include the development of strategies for the use of environmental protection equipment, which are determined by the conditions for wastewater treatment of purified sewage and oily bilge water as well as technical characteristics of the vessels, the introduction of the process of the out-of-the-vessel processing of ship pollution as a technology for their movement. This must take into account the operating conditions of vessels on different sections of waterways. An algorithm of actions aimed at ensuring ecological safety of operated vessels is proposed.
Process Operations Program is the First of Its Kind
ERIC Educational Resources Information Center
Elements of Technology, 1973
1973-01-01
The goal of the program is to produce a graduate with the technical background and expertise necessary for direct entry into a process operator training program in a petro-chemical plant. It is a unique program offered through Lambton College, Canada, in co-operation with the process industries in Sarnia's "Chemical Valley". (Author/DS)
Design and Assessment of an Associate Degree-Level Plant Operations Technical Education Program
ERIC Educational Resources Information Center
Selwitz, Jason Lawrence
2017-01-01
Research was undertaken to develop and evaluate an associate degree-level technical education program in Plant Operations oriented towards training students in applied science, technology, engineering, and mathematics (STEM) skills and knowledge relevant to a spectrum of processing industries. This work focuses on four aspects of the curriculum…
RTO Technical Publications: A Quarterly Listing
NASA Technical Reports Server (NTRS)
2004-01-01
This is a listing of recent unclassified RTO technical publications processed by the NASA Center for AeroSpace Information. Contents include the following: RTO Technical Publications: A Quarterly Listing. Implications of Multilingual Interoperability of Speech Technology for Military Use. Non-Lethal Weapons and Future Peace Enforcement Operations.
Identifying Potential Weapon Systems That Can Be Divested
2016-04-08
List of Figures Figure 1.1 – TACOM LCMC Sustainment Systems Technical Support (SSTS) Operation Maintenance Army (OMA)……………………………………………………………………….6...LCMC Sustainment Systems Technical Support (SSTS) Operation Maintenance Army (OMA) Requirements Tracking System (TORTS) process used to develop...Force operational concepts (Peltz, 2003). The Army’s ability to keep systems operational from a maintenance standpoint is driven by two factors
Officer Computer Utilization Report
1992-03-01
Shipboard Non-tactical ADP Program (SNAP),Navy Intelligence Processing System (NIPS), Retail Operation Management (ROM)). Mainframe - An extremely...ADP Program (SNAP), Navy Intelligence Processing System (NIPS), Retail Operation Management (ROM), etc.) @0230@6 7 7. Technical/tactical systems (e.g
Operator Performance Support System (OPSS)
1992-02-01
both the military and the industry. The OPSS will propose practical application’ in how to more closely align the relationships between technical...industry. The OPSS will propose practical applications in how to more closely align the relationships between technical knowledge and equipment operator...commercial programs provide flexibility to suppori existing and futurc kourscware and "hardware enhancements. In the development process of the OPSS
2007-05-01
business processes and services. 4. Security operations management addresses the day-to-day activities that the organization performs to protect the...Management TM – Technology Management Security Operations Management SOM – Security Operations Management 5.7.2 Important Operations Competency...deals with the provision of access rights to informa- tion and technical assets SOM – Security Operations Management , which addresses the fundamental
OR2020: The Operating Room of the Future
2004-05-01
25 3.3 Technical Requirements: Standards and Tools for Improved Operating R oom Process Integration...Image processing and visualization tools must be made available to the operating room. 5. Communications issues must be addressed and aim toward...protocols for effectively performing advanced surgeries and using telecommunications-ready tools as needed. The following recommendations were made
2008-01-01
PDA Technical Report No. 14 has been written to provide current best practices, such as application of risk-based decision making, based in sound science to provide a foundation for the validation of column-based chromatography processes and to expand upon information provided in Technical Report No. 42, Process Validation of Protein Manufacturing. The intent of this technical report is to provide an integrated validation life-cycle approach that begins with the use of process development data for the definition of operational parameters as a basis for validation, confirmation, and/or minor adjustment to these parameters at manufacturing scale during production of conformance batches and maintenance of the validated state throughout the product's life cycle.
TLOG: Training and Educating Operational Logistic Planners
2008-05-22
monograph recommends specific changes to the current curriculum. Additions in operational knowledge provide the students technical knowledge and a...common frame of reference in campaign planning. The changes result in students not only technically competent to design a concept of support, but...planning process. The implementation of these changes enhance TLog’s curriculum to meet the course’s stated goal; the graduates will be the
Laparoscopic repair of inguinal hernia in adults
Yang, Xue-Fei
2016-01-01
Laparoscopic repair of inguinal hernia is mini-invasive and has confirmed effects. The procedures include intraperitoneal onlay mesh (IPOM) repair, transabdominal preperitoneal (TAPP) repair and total extraperitoneal (TEP) repair. These procedures have totally different anatomic point of view, process and technical key points from open operations. The technical details of these operations are discussed in this article, also the strategies of treatment for some special conditions. PMID:27867954
Physical Origins of Space Weather Impacts: Open Physics Questions
NASA Astrophysics Data System (ADS)
Lanzerotti, L. J.
2011-12-01
Beginning with the era of development of electrical telegraph systems in the early 19th century, physical processes in the space environment on the Sun, in the interplanetary medium, and around Earth have influenced the design and operations of ever-increasing and sophisticated technical systems, both in space and on the ground. Understanding of Earth's space environment has increased enormously in the last century and one-half. Nevertheless, many of the physical processes that produced effects on early cable and wireless technologies continue to plague modern-day systems. And as new technologies are developed for improved communications, surveillance, navigation, and conditions for human space flight, the solar-terrestrial environment often offers surprises to their safe, secure and uninterrupted operations. This talk will address some of the challenges that I see to the successful operations of some modern-day technical systems that are posed by significant deficiencies of understanding of physical processes operating from the Sun to the Earth.
Yule, Steven; Parker, Sarah Henrickson; Wilkinson, Jill; McKinley, Aileen; MacDonald, Jamie; Neill, Adrian; McAdam, Tim
2015-01-01
To investigate the effect of coaching on non-technical skills and performance during laparoscopic cholecystectomy in a simulated operating room (OR). Non-technical skills (situation awareness, decision making, teamwork, and leadership) underpin technical ability and are critical to the success of operations and the safety of patients in the OR. The rate of developing assessment tools in this area has outpaced development of workable interventions to improve non-technical skills in surgical training and beyond. A randomized trial was conducted with senior surgical residents (n = 16). Participants were randomized to receive either non-technical skills coaching (intervention) or to self-reflect (control) after each of 5 simulated operations. Coaching was based on the Non-Technical Skills For Surgeons (NOTSS) behavior observation system. Surgeon-coaches trained in this method coached participants in the intervention group for 10 minutes after each simulation. Primary outcome measure was non-technical skills, assessed from video by a surgeon using the NOTSS system. Secondary outcomes were time to call for help during bleeding, operative time, and path length of laparoscopic instruments. Non-technical skills improved in the intervention group from scenario 1 to scenario 5 compared with those in the control group (p = 0.04). The intervention group was faster to call for help when faced with unstoppable bleeding in the final scenario (no. 5; p = 0.03). Coaching improved residents' non-technical skills in the simulated OR compared with those in the control group. Important next steps are to implement non-technical skills coaching in the real OR and assess effect on clinically important process measures and patient outcomes. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.
KSC Technical Capabilities Website
NASA Technical Reports Server (NTRS)
Nufer, Brian; Bursian, Henry; Brown, Laurette L.
2010-01-01
This document is the website pages that review the technical capabilities that the Kennedy Space Center (KSC) has for partnership opportunities. The purpose of this information is to make prospective customers aware of the capabilities and provide an opportunity to form relationships with the experts at KSC. The technical capabilities fall into these areas: (1) Ground Operations and Processing Services, (2) Design and Analysis Solutions, (3) Command and Control Systems / Services, (4) Materials and Processes, (5) Research and Technology Development and (6) Laboratories, Shops and Test Facilities.
Planning for organization development in operations control centers.
DOT National Transportation Integrated Search
2012-06-01
The first step in a proposed program of organization development (OD) was to assess organizational processes within the : Technical Operations Services (TechOps) Operations Control Centers (OCCs). The aim of the OD program was to : improve effectiven...
PNNL Supports Hanford Waste Treatment
None
2018-04-16
For more than 40 years, technical assistance from PNNL has supported the operations and processing of Hanford tank waste. Our expertise in tank waste chemistry, fluid dynamics and scaling, waste forms, and safety bases has helped to shape the siteâs waste treatment baseline and solve operational challenges. The historical knowledge and unique scientific and technical expertise at PNNL are essential to the success of the Hanford mission.
NASA Technical Reports Server (NTRS)
Watson, Michael D.; Kelley, Gary W.
2012-01-01
The Department of Defense (DoD) defined System Operational Effectiveness (SOE) model provides an exceptional framework for an affordable approach to the development and operation of space launch vehicles and their supporting infrastructure. The SOE model provides a focal point from which to direct and measure technical effectiveness and process efficiencies of space launch vehicles. The application of the SOE model to a space launch vehicle's development and operation effort leads to very specific approaches and measures that require consideration during the design phase. This paper provides a mapping of the SOE model to the development of space launch vehicles for human exploration by addressing the SOE model key points of measurement including System Performance, System Availability, Technical Effectiveness, Process Efficiency, System Effectiveness, Life Cycle Cost, and Affordable Operational Effectiveness. In addition, the application of the SOE model to the launch vehicle development process is defined providing the unique aspects of space launch vehicle production and operations in lieu of the traditional broader SOE context that examines large quantities of fielded systems. The tailoring and application of the SOE model to space launch vehicles provides some key insights into the operational design drivers, capability phasing, and operational support systems.
ERIC Educational Resources Information Center
Silvester, June P.; And Others
This report describes a new automated process that pioneers full-scale operational use of subject switching by the NASA (National Aeronautics and Space Administration) Scientific and Technical Information (STI) Facility. The subject switching process routinely translates machine-readable subject terms from one controlled vocabulary into the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chevallier, J.J.; Quetier, F.P.; Marshall, D.W.
Sedco Forex has developed an integrated computer system to enhance the technical performance of the company at various operational levels and to increase the understanding and knowledge of the drill crews. This paper describes the system and how it is used for recording and processing drilling data at the rig site, for associated technical analyses, and for well design, planning, and drilling performance studies at the operational centers. Some capabilities related to the statistical analysis of the company's operational records are also described, and future development of rig computing systems for drilling applications and management tasks is discussed.
2011-01-01
Pacific theater, the 311th SC (T) is the Army’s IT service provider. They execute the activities associated with network operation , management , and...processes, and infrastructure responsible for the operation , management and health of the network under a single, administrative control entity. The...all other 311th operational entities to execute the NSC operational concept. They are primarily responsible for the technical operation
Technical information report: Plasma melter operation, reliability, and maintenance analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hendrickson, D.W.
1995-03-14
This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.
NASA Astrophysics Data System (ADS)
Zhukovskiy, Y.; Koteleva, N.
2017-10-01
Analysis of technical and technological conditions for the emergence of emergency situations during the operation of electromechanical equipment of enterprises of the mineral and raw materials complex shows that when developing the basis for ensuring safe operation, it is necessary to take into account not only the technical condition, but also the non-stationary operation of the operating conditions of equipment, and the nonstationarity of operational operating parameters of technological processes. Violations of the operation of individual parts of the machine, not detected in time, can lead to severe accidents at work, as well as to unplanned downtime and loss of profits. That is why, the issues of obtaining and processing Big data obtained during the life cycle of electromechanical equipment, for assessing the current state of the electromechanical equipment used, timely diagnostics of emergency and pre-emergency modes of its operation, estimating the residual resource, as well as prediction the technical state on the basis of machine learning are very important. This article is dedicated to developing the special method of data storing, collection and aggregation for definition of life-cycle resources of electromechanical equipment. This method can be used in working with big data and can allow extracting the knowledge from different data types: the plants’ historical data and the factory historical data. The data of the plants contains the information about electromechanical equipment operation and the data of the factory contains the information about a production of electromechanical equipment.
Boiler MACT Technical Assistance (Fact Sheet)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2012-03-01
Fact sheet describing the changes to Environmental Protection Act process standards. The DOE will offer technical assistance to ensure that major sources burning coal and oil have information on cost-effective, clean energy strategies for compliance, and to promote cleaner, more efficient boiler burning to cut harmful pollution and reduce operational costs. The U.S. Environmental Protection Agency (EPA) is expected to finalize the reconsideration process for its Clean Air Act pollution standards National Emissions Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters (known as Boiler Maximum Achievable Control Technology (MACT)), in Spring 2012.more » This rule applies to large and small boilers in a wide range of industrial facilities and institutions. The U.S. Department of Energy (DOE) will offer technical assistance to ensure that major sources burning coal or oil have information on cost-effective clean energy strategies for compliance, including combined heat and power, and to promote cleaner, more efficient boilers to cut harmful pollution and reduce operational costs.« less
Technical Objective Document. Fiscal Year 1989
1987-12-01
other special interest areas/technologies; and throuch a " delphi " process with the Center Technical Investment Committee *develop a "puts and takes...radar and larce optical systems in space, the detection and trackina of low observables, and the operation of sensors for tracking objects in space for...for reducing the processing time for adaptive beamforming in receive arrays, self-coherina techniques in larce distributed arrays and array self
DOE Office of Scientific and Technical Information (OSTI.GOV)
De Volpi, A.; Fenrick, M. R.; Stanford, G. S.
1980-10-01
Documentation often is a primary residual of research and development. Because of this important role and because of the large amount of time consumed in generating technical reports, particularly those containing formulas and graphics, an existing data-processing computer system has been adapted so as to provide text-processing of technical documents. Emphasis has been on accuracy, turnaround time, and time savings for staff and secretaries, for the types of reports normally produced in the reactor development program. The computer-assisted text-processing system, called TXT, has been implemented to benefit primarily the originator of technical reports. The system is of particular value tomore » professional staff, such as scientists and engineers, who have responsibility for generating much correspondence or lengthy, complex reports or manuscripts - especially if prompt turnaround and high accuracy are required. It can produce text that contains special Greek or mathematical symbols. Written in FORTRAN and MACRO, the program TXT operates on a PDP-11 minicomputer under the RSX-11M multitask multiuser monitor. Peripheral hardware includes videoterminals, electrostatic printers, and magnetic disks. Either data- or word-processing tasks may be performed at the terminals. The repertoire of operations has been restricted so as to minimize user training and memory burden. Spectarial staff may be readily trained to make corrections from annotated copy. Some examples of camera-ready copy are provided.« less
Weigl, Matthias; Stefan, Philipp; Abhari, Kamyar; Wucherer, Patrick; Fallavollita, Pascal; Lazarovici, Marc; Weidert, Simon; Euler, Ekkehard; Catchpole, Ken
2016-02-01
Surgical flow disruptions occur frequently and jeopardize perioperative care and surgical performance. So far, insights into subjective and cognitive implications of intra-operative disruptions for surgeons and inherent consequences for performance are inconsistent. This study aimed to investigate the effect of surgical flow disruption on surgeon's intra-operative workload and technical performance. In a full-scale OR simulation, 19 surgeons were randomly allocated to either of the two disruption scenarios (telephone call vs. patient discomfort). Using a mixed virtual reality simulator with a computerized, high-fidelity mannequin, all surgeons were trained in performing a vertebroplasty procedure and subsequently performed such a procedure under experimental conditions. Standardized measures on subjective workload and technical performance (trocar positioning deviation from expert-defined standard, number, and duration of X-ray acquisitions) were collected. Intra-operative workload during simulated disruption scenarios was significantly higher compared to training sessions (p < .01). Surgeons in the telephone call scenario experienced significantly more distraction compared to their colleagues in the patient discomfort scenario (p < .05). However, workload tended to be increased in surgeons who coped with distractions due to patient discomfort. Technical performance was not significantly different between both disruption scenarios. We found a significant association between surgeons' intra-operative workload and technical performance such that surgeons with increased mental workload tended to perform worse (β = .55, p = .04). Surgical flow disruptions affect surgeons' intra-operative workload. Increased mental workload was associated with inferior technical performance. Our simulation-based findings emphasize the need to establish smooth surgical flow which is characterized by a low level of process deviations and disruptions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less
NASA Astrophysics Data System (ADS)
Vaganova, N. A.
2017-12-01
Technogenic and climatic influences have a significant impact on the degradation of permafrost. Long-term forecasts of such changes during long-time periods have to be taken into account in the oil and gas and construction industries in view to development the Arctic and Subarctic regions. There are considered constantly operating technical systems (for example, oil and gas wells) that affect changes in permafrost, as well as the technical systems that have a short-term impact on permafrost (for example, flare systems for emergency flaring of associated gas). The second type of technical systems is rather complex for simulation, since it is required to reserve both short and long-scales in computations with variable time steps describing the complex technological processes. The main attention is paid to the simulation of long-term influence on the permafrost from the second type of the technical systems.
77 FR 48112 - Pipeline Safety: Administrative Procedures; Updates and Technical Corrections
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-13
...This Notice of Proposed Rulemaking updates the administrative civil penalty maximums for violation of the pipeline safety regulations to conform to current law, updates the informal hearing and adjudication process for pipeline enforcement matters to conform to current law, amends other administrative procedures used by PHMSA personnel, and makes other technical corrections and updates to certain administrative procedures. The proposed amendments do not impose any new operating, maintenance, or other substantive requirements on pipeline owners or operators.
The Operating Technician's Role in Video Distance Learning.
ERIC Educational Resources Information Center
Olesinski, Raymond L.; And Others
Operating technicians play a number of roles in video, or televised, distance learning programs, the most obvious being the operation and support of the technology itself. Very little information exists, however, about the non-technical activities of technicians that may influence the instruction process. This paper describes these activities…
Modeling the Technological Process for Harvesting of Agricultural Produce
NASA Astrophysics Data System (ADS)
Shepelev, S. D.; Shepelev, V. D.; Almetova, Z. V.; Shepeleva, N. P.; Cheskidov, M. V.
2018-01-01
The efficiency and the parameters of harvesting as a technological process being substantiated make it possible to reduce the cost of production and increase the profit of enterprises. To increase the efficiency of combine harvesters when the level of technical equipment declines is possible due to their efficient operating modes within daily and every season. Therefore, the correlation between the operational daily time and the seasonal load of combine harvesters is found, with the increase in the seasonal load causing the prolonged duration of operational daily time for harvesters being determined. To increase the efficient time of the seasonal load is possible due to a reasonable ratio of crop varieties according to their ripening periods, the necessary quantity of machines thereby to be reduced up to 40%. By timing and field testing the operational factor of the useful shift time of combine harvesters and the efficient modes of operating machines are defined, with the alternatives for improving the technical readiness of combine harvesters being identified.
NASA Astrophysics Data System (ADS)
Kasiani; Suhantono, Djoko; Mirah Kencanawati, AAA
2018-01-01
Candikuning is part of the district of Baturiti, tourism village, better known by the name of Bedugul. No less interesting is the variety of chips produced by two partner groups as a souvenir after the tour, such as Chips: Spinach; beans; Tempeh. The purpose of this research were to design a Standard Operating Procedure (SOP): Production Processes on the Home Industry Bedugul Baturiti Tabanan Bali. The data technic collected use: observation; Documentation; and then interview to collect information. The data analysis technic done by using the Miles & Huberman. Result this research that the draft SOP: Production Processes Chips (Menu). The conclusion in this research SOP Production Processes use with flowchart and description on the Home Industry Bedugul Baturiti Tabanan Bali.
NASA Technical Reports Server (NTRS)
1978-01-01
A technical analysis on the feasibility of commercial manufacturing of pharmaceuticals in space is presented. The method of obtaining pharmaceutical company involvement, laboratory results of the separation of serum proteins by the continuous flow electrophoresis process, the selection and study of candidate products, and their production requirements is described. The candidate products are antihemophilic factor, beta cells, erythropoietin, epidermal growth factor, alpha-1-antitrypsin and interferon. Production mass balances for antihemophelic factor, beta cells, and erythropoietin were compared for space versus ground operation. A conceptual description of a multiproduct processing system for space operation is discussed. Production requirements for epidermal growth factor of alpha-1-antitrypsin and interferon are presented.
ERIC Educational Resources Information Center
Welker, William F.; Morgan, Samuel D.
1991-01-01
Analyzes the content of the literature on community, junior, and technical colleges, utilizing a matrix with seven major classifications (i.e., governance, organization, staffing, clientele, curriculum, finance, and evaluation) and three dimensions (i.e., structure/form, function/role, and process/operations). Offers observations on effectiveness…
Innovation adoption processes for third party property management companies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shockman, Chris; Piette, Mary Ann
2000-07-01
Innovation adoption studies have never been applied to third party property management companies. These companies manage buildings for a fee as their primary business. Property management companies are influential in the adoption process for new technologies because they act as gatekeepers for technical information. This study analyzes radical and routine adoption process that are found in large, professionally operated property management companies. The process is explicated. The technical managers, and their role as technology gate keepers, are described. The distinction to the technical managers between routine and radical technology is that routine technologies do something in a new way andmore » radical technologies do something new. Observations concerning evaluation and adoption of information technologies are described. The findings suggest methods of successfully tailoring and introducing technologies to this market.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anton, David
The proposed project built on the foundation of over several years years of intensive and ground-breaking R&D work at Cellana's Kona Demonstration Facility (KDF). Phycological and engineering solutions were provided to tackle key cultivation issues and technical barriers limiting algal biomass productivity identified through work conducted outdoors at industrial (1 acre) scale. The objectives of this project were to significantly improve algal biomass productivity and reduce operational cost in a seawater-based system, using results obtained from two top-performing algal strains as the baseline while technically advancing and more importantly, integrating the various unit operations involved in algal biomass production, processing,more » and refining.« less
Technology and development requirements for advanced coal conversion systems
NASA Technical Reports Server (NTRS)
1981-01-01
A compendium of coal conversion process descriptions is presented. The SRS and MC data bases were utilized to provide information paticularly in the areas of existing process designs and process evaluations. Additional information requirements were established and arrangements were made to visit process developers, pilot plants, and process development units to obtain information that was not otherwise available. Plant designs, process descriptions and operating conditions, and performance characteristics were analyzed and requirements for further development identified and evaluated to determine the impact of these requirements on the process commercialization potential from the standpoint of economics and technical feasibility. A preliminary methodology was established for the comparative technical and economic assessment of advanced processes.
A Socio-technical Approach for Transient SME Alliances
NASA Astrophysics Data System (ADS)
Rezgui, Yacine
The paper discusses technical requirements to promote the adoption of alliance modes of operation by SMEs in the construction sector. These requirements have provided a basis for specifying a set of functionality to support the collaboration and cooperation needs of SMEs. While service-oriented architectures and semantic web services provide the middleware technology to implement the identified functionality, a number of key technical limitations have been identified, including lack of support for the dynamic and non-functional characteristics of SME alliances distributed business processes, lack of execution monitoring functionality to manage running business processes, and lack of support for semantic reasoning to enable SME business process service composition. The paper examines these issues and provides key directions for supporting SME alliances effectively.
Transportation-markings general table of contents with index
DOT National Transportation Integrated Search
2008-01-01
The T-M process outlined in these studies describes and classifies safety aids that assist operators of modes of transportation that process also includes technical and historical perspectives. However; a simple describing and classifying of safety a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LUECK, K.J.
2004-10-18
This report documents an engineering study conducted to evaluate alternatives for treating secondary waste in the secondary treatment train (STT) of the Hanford Site 200 Area Effluent Treatment Facility (ETF). The study evaluates ETF STT treatment alternatives and recommends preferred alternatives for meeting the projected future missions of the ETF. The preferred alternative(s) will process projected future ETF influents to produce a solid waste acceptable for final disposal on the Hanford Site. The main text of this report summarizes the ETF past and projected operations, lists the assumptions about projected operations that provide the basis for the engineering evaluation, andmore » summarizes the evaluation process. The evaluation process includes identification of available modifications to the current ETF process, screens those modifications for technical viability, evaluates the technically viable alternatives, and provides conclusions and recommendations based on that evaluation.« less
Lumber processing in selected sawmills in Durango and Oaxaca, Mexico
Roland Hernandez; Michael C. Wiemann
2006-01-01
This report documents a technical assistance trip to four community-owned forests and associated sawmill and secondary processing operations in the vicinities of Durango and Oaxaca, Mexico. The products and processes of these enterprises are described, and recommendations for improvement are provided.
DOT National Transportation Integrated Search
2015-04-01
Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...
Method of Individual Forecasting of Technical State of Logging Machines
NASA Astrophysics Data System (ADS)
Kozlov, V. G.; Gulevsky, V. A.; Skrypnikov, A. V.; Logoyda, V. S.; Menzhulova, A. S.
2018-03-01
Development of the model that evaluates the possibility of failure requires the knowledge of changes’ regularities of technical condition parameters of the machines in use. To study the regularities, the need to develop stochastic models that take into account physical essence of the processes of destruction of structural elements of the machines, the technology of their production, degradation and the stochastic properties of the parameters of the technical state and the conditions and modes of operation arose.
Managing the equipment service life in rendering engineering support to NPP operation
NASA Astrophysics Data System (ADS)
Ryasnyy, S. I.
2015-05-01
Apart from subjecting metal to nondestructive testing and determining its actual state, which are the traditional methods used for managing the service life of NPP equipment during its operation, other approaches closely linked with rendering engineering support to NPP operation have emerged in recent decades, which, however, have been covered in publications to a lesser extent. Service life management matters occupy the central place in the structure of engineering support measures. Application of the concept of repairing NPP equipment based on assessing its technical state and the risk of its failure makes it possible to achieve significantly smaller costs for maintenance and repairs and produce a larger amount of electricity due to shorter planned outages. Decreasing the occurrence probability of a process-related abnormality through its prediction is a further development of techniques for monitoring the technical state of equipment and systems. The proposed and implemented procedure for predicting the occurrence of process-related deviations from normal NPP operation opens the possibility to record in the online mode the trends in changes of process parameters that are likely to lead to malfunctions in equipment operation and to reduce the probability of power unit unloading when an abnormal technical state of equipment occurs and develops by recording changes in the state at an early stage and taking timely corrective measures. The article presents the structure of interconnections between the objectives and conditions of adjustment and commissioning tests, in which the management of equipment service life (saving and optimizing the service life) occupies the central place. Special attention is paid to differences in resource saving and optimization measures.
Clinical operations management in radiology.
Ondategui-Parra, Silvia; Gill, Ileana E; Bhagwat, Jui G; Intrieri, Lisa A; Gogate, Adheet; Zou, Kelly H; Nathanson, Eric; Seltzer, Steven E; Ros, Pablo R
2004-09-01
Providing radiology services is a complex and technically demanding enterprise in which the application of operations management (OM) tools can play a substantial role in process management and improvement. This paper considers the benefits of an OM process in a radiology setting. Available techniques and concepts of OM are addressed, along with gains and benefits that can be derived from these processes. A reference framework for the radiology processes is described, distinguishing two phases in the initial assessment of a unit: the diagnostic phase and the redesign phase.
ERIC Educational Resources Information Center
Chang, Liang-Te; And Others
A study was conducted to develop the electronic technical competencies of duty and task analysis by using a revised DACUM (Developing a Curriculum) method, a questionnaire survey, and a fuzzy synthesis operation. The revised DACUM process relied on inviting electronics trade professionals to analyze electronic technology for entry-level…
Multidisciplinary team simulation for the operating theatre: a review of the literature.
Tan, Shaw Boon; Pena, Guilherme; Altree, Meryl; Maddern, Guy J
2014-01-01
Analyses of adverse events inside the operating theatre has demonstrated that many errors are caused by failure in non-technical skills and teamwork. While simulation has been used successfully for teaching and improving technical skills, more recently, multidisciplinary simulation has been used for training team skills. We hypothesized that this type of training is feasible and improves team skills in the operating theatre. A systematic search of the literature for studies describing true multidisciplinary operating theatre team simulation was conducted in November and December 2012. We looked at the characteristics and outcomes of the team simulation programmes. 1636 articles were initially retrieved. Utilizing a stepwise evaluation process, 26 articles were included in the review. The studies reveal that multidisciplinary operating theatre simulation has been used to provide training in technical and non-technical skills, to help implement new techniques and technologies, and to identify latent weaknesses within a health system. Most of the studies included are descriptions of training programmes with a low level of evidence. No randomized control trial was identified. Participants' reactions to the training programme were positive in all studies; however, none of them could objectively demonstrate that skills acquired from simulation are transferred to the operating theatre or show a demonstrable benefit in patient outcomes. Multidisciplinary operating room team simulation is feasible and widely accepted by participants. More studies are required to assess the impact of this type of training on operative performance and patient safety. © 2013 Royal Australasian College of Surgeons.
Introduction to System Health Engineering and Management in Aerospace
NASA Technical Reports Server (NTRS)
Johnson, Stephen B.
2005-01-01
This paper provides a technical overview of Integrated System Health Engineering and Management (ISHEM). We define ISHEM as "the paper provides a techniques, and technologies used to design, analyze, build, verify, and operate a system to prevent faults and/or minimize their effects." This includes design and manufacturing techniques as well operational and managerial methods. ISHEM is not a "purely technical issue" as it also involves and must account for organizational, communicative, and cognitive f&ms of humans as social beings and as individuals. Thus the paper will discuss in more detail why all of these elements, h m the technical to the cognitive and social, are necessary to build dependable human-machine systems. The paper outlines a functional homework and architecture for ISHEM operations, describes the processes needed to implement ISHEM in the system life-cycle, and provides a theoretical framework to understand the relationship between the different aspects of the discipline. It then derives from these and the social and cognitive bases a set of design and operational principles for ISHEM.
Emergency Management Operations Process Mapping: Public Safety Technical Program Study
2011-02-01
Enterprise Architectures in industry, and have been successfully applied to assist companies to optimise interdependencies and relationships between...model for more in-depth analysis of EM processes, and for use in tandem with other studies that apply modeling and simulation to assess EM...for use in tandem with other studies that apply modeling and simulation to assess EM operational effectiveness before and after changing elements
NASA Technical Reports Server (NTRS)
Jacobs, Irwin M.; Salmasi, Allen; Gilhousen, Klein S.; Weaver, Lindsay A., Jr.; Bernard, Thomas J.
1990-01-01
A novel two-way mobile satellite communications and vehicle position reporting system that is currently operational in the United States and Europe is described. The system characteristics and service operations are described in detail. Technical descriptions of the equipment and signal processing techniques are provided.
Dissemination of technical information from the oil-shale program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-09-03
Auditors found cause to believe that DOE was not receiving technical information from a jointly financed demonstration project in Colorado to produce shale oil means of the modified in-situ process. The governments right to use and disseminate technical information developed under the Cooperative Agreement is seen a a contractual right spelled out in the Agreement for cost sharing. Enforcement is necessary to lessen vulnerability to charges of subsidy of private research and development without adequate benefits to the public. This final report was prepared after sending the draft report to the Assistant Secretaries of Fossil Energy (FE) and of Resourcemore » Applications (RA) for comments. IG still takes issue with some of the comments by FE, which are attached. Comments by IR, also appended, point out operational changes at the DOE Technical Information Center, Oak Ridge, TN that will improve, its publication operations time.« less
SME Acceptability Determination For DWPF Process Control (U)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edwards, T.
2017-06-12
The statistical system described in this document is called the Product Composition Control System (PCCS). K. G. Brown and R. L. Postles were the originators and developers of this system as well as the authors of the first three versions of this technical basis document for PCCS. PCCS has guided acceptability decisions for the processing at the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) since the start of radioactive operations in 1996. The author of this revision to the document gratefully acknowledges the firm technical foundation that Brown and Postles established to support the ongoing successfulmore » operation at the DWPF. Their integration of the glass propertycomposition models, developed under the direction of C. M. Jantzen, into a coherent and robust control system, has served the DWPF well over the last 20+ years, even as new challenges, such as the introduction into the DWPF flowsheet of auxiliary streams from the Actinide Removal Process (ARP) and other processes, were met. The purpose of this revision is to provide a technical basis for modifications to PCCS required to support the introduction of waste streams from the Salt Waste Processing Facility (SWPF) into the DWPF flowsheet. An expanded glass composition region is anticipated by the introduction of waste streams from SWPF, and property-composition studies of that glass region have been conducted. Jantzen, once again, directed the development of glass property-composition models applicable for this expanded composition region. The author gratefully acknowledges the technical contributions of C.M. Jantzen leading to the development of these glass property-composition models. The integration of these models into the PCCS constraints necessary to administer future acceptability decisions for the processing at DWPF is provided by this sixth revision of this document.« less
The composing process in technical communications
NASA Technical Reports Server (NTRS)
Hertz, V. L.
1981-01-01
The theoretical construct under which technical writing exercises operate and results from a survey distributed to a random sample of teachers of technical writing are described. The survey, part of a study to develop materials that did not stress prescriptive formats, drew on diverse elements in report writing to enhance writing as a process. Areas of agreement and disagreement related to problem solving, paper evaluation, and individualizing instruction were surveyed. Areas of concern in contemplating the composition process include: (1) the need to create an environment that helps students want to succeed, (2) the role of peer group activity in helping some students who might not respond through lecture or individual study, and (3) encouraging growth in abilities and helping motivate students' interest in writing projects through relevant assignments or simulations students perceive as relevant.
Data Development of Detail Standards For Outside Machinery Operations
1985-01-01
the preparation of food . oven operates differently than the conventional free heat The convection oven forces the heat to circulate by the For the...that the product at the various stages meets quality and technical workmanship established by drawings, Manufact - uring Standard Processes, as well as
Spaceflight Operations Services Grid (SOSG) Project
NASA Technical Reports Server (NTRS)
Bradford, Robert; Lisotta, Anthony
2004-01-01
The motivation, goals, and objectives of the Space Operations Services Grid Project (SOSG) are covered in this viewgraph presentation. The goals and objectives of SOSG include: 1) Developing a grid-enabled prototype providing Space-based ground operations end user services through a collaborative effort between NASA, academia, and industry to assess the technical and cost feasibility of implementation of Grid technologies in the Space Operations arena; 2) Provide to space operations organizations and processes, through a single secure portal(s), access to all the information technology (Grid and Web based) services necessary for program/project development, operations and the ultimate creation of new processes, information and knowledge.
Uranium hexafluoride: Safe handling, processing, and transporting: Conference proceedings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Strunk, W.D.; Thornton, S.G.
This conference seeks to provide a forum for the exchange of information and ideas of the safety aspects and technical issue related to the handling of uranium hexafluoride. By allowing operators, engineers, scientists, managers, educators, and others to meet and share experiences of mutual concern, the conference is also intended to provide the participants with a more complete knowledge of technical and operational issues. The topics for the papers in the proceedings are widely varied and include the results of chemical, metallurgical, mechanical, thermal, and analytical investigations, as well as the developed philosophies of operational, managerial, and regulatory guidelines. Papersmore » have been entered individually into EDB and ERA. (LTN)« less
Systems engineering and integration processes involved with manned mission operations
NASA Technical Reports Server (NTRS)
Kranz, Eugene F.; Kraft, Christopher C.
1993-01-01
This paper will discuss three mission operations functions that are illustrative of the key principles of operations SE&I and of the processes and products involved. The flight systems process was selected to illustrate the role of the systems product line in developing the depth and cross disciplinary skills needed for SE&I and providing the foundation for dialogue between participating elements. FDDD was selected to illustrate the need for a structured process to assure that SE&I provides complete and accurate results that consistently support program needs. The flight director's role in mission operations was selected to illustrate the complexity of the risk/gain tradeoffs involved in the development of the flight techniques and flight rules process as well as the absolute importance of the leadership role in developing the technical, operational, and political trades.
PCs: Key to the Future. Business Center Provides Sound Skills and Good Attitudes.
ERIC Educational Resources Information Center
Pay, Renee W.
1991-01-01
The Advanced Computing/Management Training Program at Jordan Technical Center (Sandy, Utah) simulates an automated office to teach five sets of skills: computer architecture and operating systems, word processing, data processing, communications skills, and management principles. (SK)
The Independent Technical Analysis Process Final Report 2006-2007.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Duberstein, Corey; Ham, Kenneth; Dauble, Dennis
2007-03-01
The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities. The Independent Technical Analysis Process (ITAP) was created to provide non-routine analysis for fish and wildlife agencies and tribes in particular and the public in general on matters related tomore » juvenile and adult salmon and steelhead passage through the mainstem hydrosystem. The process was designed to maintain the independence of analysts and reviewers from parties requesting analyses, to avoid potential bias in technical products. The objectives identified for this project were to administer a rigorous, transparent process to deliver unbiased technical assistance necessary to coordinate recommendations for storage reservoir and river operations that avoid potential conflicts between anadromous and resident fish. Seven work elements, designated by numbered categories in the Pisces project tracking system, were created to define and accomplish project goals as follows: (1) 118 Coordination - Coordinate technical analysis and review process: (a) Retain expertise for analyst/reviewer roles. (b) Draft research directives. (c) Send directive to the analyst. (d) Coordinate two independent reviews of the draft report. (e) Ensure reviewer comments are addressed within the final report. (2) 162 Analyze/Interpret Data - Implement the independent aspects of the project. (3) 122 Provide Technical Review - Implement the review process for the analysts. (4) 132 Produce Annual Report - FY06 annual progress report with Pisces Disseminate (5) 161 Disseminate Raw/Summary Data and Results - Post technical products on the ITAP web site. (6) 185-Produce Pisces Status Report - Provide periodic status reports to BPA. (7) 119 Manage and Administer Projects - project/contract administration.« less
He, Longjun; Xu, Lang; Ming, Xing; Liu, Qian
2015-02-01
Three-dimensional post-processing operations on the volume data generated by a series of CT or MR images had important significance on image reading and diagnosis. As a part of the DIOCM standard, WADO service defined how to access DICOM objects on the Web, but it didn't involve three-dimensional post-processing operations on the series images. This paper analyzed the technical features of three-dimensional post-processing operations on the volume data, and then designed and implemented a web service system for three-dimensional post-processing operations of medical images based on the WADO protocol. In order to improve the scalability of the proposed system, the business tasks and calculation operations were separated into two modules. As results, it was proved that the proposed system could support three-dimensional post-processing service of medical images for multiple clients at the same moment, which met the demand of accessing three-dimensional post-processing operations on the volume data on the web.
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
NASA Technical Reports Server (NTRS)
1973-01-01
Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.
Managing ISR sharing policies at the network edge using Controlled English
NASA Astrophysics Data System (ADS)
Parizas, Christos; Pizzocaro, Diego; Preece, Alun; Zerfos, Petros
2013-05-01
In domains such as emergency response and military operations the sharing of Intelligence, Surveillance and Reconnaissance (ISR) assets among different coalition partners is regulated through policies. Traditionally, poli cies are created at the center of a coalitions network by high-level decision makers and expressed in low-level policy languages (e.g. Common Information Model SPL) by technical personnel, which makes them difficult to be understood by non-technical users at the edge of the network. Moreover, policies must often be modified by negotiation among coalition partners, typically in rapid response to the changing operational situation. Com monly, the users who must cope first with situational changes are those on the edge, so it would be very effective if they were able to create and negotiate policies themselves. We investigate the use of Controlled English (CE) as a means to define a policy representation that is both human-friendly and machine processable. We show how a CE model can capture a variety of policy types, including those based on a traditional asset ownership model, and those defining team-based asset sharing across a coalition. The use of CE is intended to benefit coalition networks by bridging the gap between technical and non-technical users in terms of policy creation and negoti ation, while at the same time being directly processable by a policy-checking system without transformation to any other technical representation.
OPALS: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS
NASA Technical Reports Server (NTRS)
Abrahamson, Matthew J.; Sindiy, Oleg V.; Oaida, Bogdan V.; Fregoso, Santos; Bowles-Martinez, Jessica N.; Kokorowski, Michael; Wilkerson, Marcus W.; Konyha, Alexander L.
2014-01-01
In spring 2014, the Optical PAyload for Lasercomm Science (OPALS) will launch to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a 90-day baseline mission, OPALS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) in Wrightwood, California. To achieve mission success, interfaces to the ISS payload operations infrastructure are established. For OPALS, the interfaces facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes such as pointing prediction and data processing satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The tests have provided valuable insight into operational considerations on the ISS.
RTO Technical Publications: A Quarterly Listing
NASA Technical Reports Server (NTRS)
2004-01-01
This is a listing of recent unclassified RTO technical publications for April 1, 2004 through June 30, 2004, processed by the NASA Center for AeroSpace Information. Topics covered include: heat transfer and cooling in propulsion and power systems; assessment of operator functional state; microwaves; aerodynamics in solid rocket propulsion; command, control, communications and intelligence modeling; personal protective equipment against anti-personnel mine blast; and data fusion and visualization.
JPRS Report, Science & Technology, USSR: Science & Technology Policy
1990-02-28
Biliary, Post-Operative, and Chronic Pancreatites ." 12. Doctor of Technical Sciences Oleg Nikolayevich Kukushkin and Candidate of Technical...Motorygin: What is amazing here: established production in case of the absence of a market and in case of a chronic shortage does not like innovations...tremendous losses due to chronic shortages of serviceable equipment. Dozens of original technological processes are aimed at solving this problem
Research Notes - An Introduction to Openness and Evolvability Assessment
2016-08-01
importance of different business and technical characteristics that combine to achieve an open solution. The complexity of most large-scale systems of...process characteristic) Granularity of the architecture (size of functional blocks) Modularity (cohesion and coupling) Support for multiple...Description) OV-3 (Operational Information Exchange Matrix) SV-1 (Systems Interface Description) TV-1 ( Technical Standards Profile). Note that there
ERIC Educational Resources Information Center
Burns, Robert W., Jr.
Three contiguous schools in the upper midwest--a teacher's training college and a private four-year college in one state, and a land-grant university in another--were studied to see if their libraries could merge one of their major divisions--technical services--into a single administrative unit. Potential benefits from such a merger were felt to…
Cogeneration technology alternatives study. Volume 6: Computer data
NASA Technical Reports Server (NTRS)
1980-01-01
The potential technical capabilities of energy conversion systems in the 1985 - 2000 time period were defined with emphasis on systems using coal, coal-derived fuels or alternate fuels. Industrial process data developed for the large energy consuming industries serve as a framework for the cogeneration applications. Ground rules for the study were established and other necessary equipment (balance-of-plant) was defined. This combination of technical information, energy conversion system data ground rules, industrial process information and balance-of-plant characteristics was analyzed to evaluate energy consumption, capital and operating costs and emissions. Data in the form of computer printouts developed for 3000 energy conversion system-industrial process combinations are presented.
Energy utilization: municipal waste incineration. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaBeck, M.F.
An assessment is made of the technical and economical feasibility of converting municipal waste into useful and useable energy. The concept presented involves retrofitting an existing municipal incinerator with the systems and equipment necessary to produce process steam and electric power. The concept is economically attractive since the cost of necessary waste heat recovery equipment is usually a comparatively small percentage of the cost of the original incinerator installation. Technical data obtained from presently operating incinerators designed specifically for generating energy, documents the technical feasibility and stipulates certain design constraints. The investigation includes a cost summary; description of process andmore » facilities; conceptual design; economic analysis; derivation of costs; itemized estimated costs; design and construction schedule; and some drawings.« less
7 CFR 1486.207 - What is the Technical Issues Resolution Fund?
Code of Federal Regulations, 2010 CFR
2010-01-01
... strategic areas of longer term interest. Funding decisions are determined primarily through a review process... CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS EMERGING MARKETS...
Technical Workshop: Advanced Helicopter Cockpit Design
NASA Technical Reports Server (NTRS)
Hemingway, J. C. (Editor); Callas, G. P. (Editor)
1984-01-01
Information processing demands on both civilian and military aircrews have increased enormously as rotorcraft have come to be used for adverse weather, day/night, and remote area missions. Applied psychology, engineering, or operational research for future helicopter cockpit design criteria were identified. Three areas were addressed: (1) operational requirements, (2) advanced avionics, and (3) man-system integration.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
... Conference. The Midwest Independent Transmission System Operator, Inc. (MISO) and/or Potomac Economics, Inc... MWs? 4. MISO states that ``[i]n principle, voltage issues would be modeled using thermal constraints... committed? Please explain. b. Can units committed based on economics in the SCUC and SCED processes be...
Technical Suitability and Static Stability of Sungkur Fishing Boats for Fish and Shrimp Catching
NASA Astrophysics Data System (ADS)
Rusmilyansari; Rosadi, E.; Iriansyah
2017-10-01
Sungkur fishing gear is operated actively on one the side of fishing boat, which requires technical suitability and fishing gear stability to ensure success in fish catching. This is a case study which aimed to analyze some technical issues related to the boat, boat’s hydrostatic parameters, and the boat’s stability. The data were collected though observation, measuring the boat to obtain the offset table. The data were analyzed numerically and descriptively. The data were processed with technical formula, Microsoft Office’s Excel software, graphic display, minitab, statistical data processing, and maxsurf program. The research results showed that: (1) the sungkur fishing boat dimensional ratio L/B (6.47 - 7.00); L/D (10.90 - 11.20) and B/D (1.60 - 1.668) is within the range value of Indonesian fishing boats suitable to operate the fishing gear by towing or dragging. However, during fish catching operation, there have been problems in a hydrodynamic force due to the fishing gear movement, which affect the fish catching efficiency. (2) The boat’s coefficient of fineness is in the fine type shape; the displacement on each waterline has increased; the loads of the boat are getting larger following the increase of waterline from one to five; this is also shown from the increasing midship area value. Ton per centimeter immersion to change wl 1 by 1 cm needs 0.04 tons of weight. (3) Sungkur fishing boat have a good static stability, which is proven by the positive value of angle of maximum GZ by 79.1 - 83.6. In other words, the boat has the ability to return to its original position after tilting; however, stability dynamics happens because fishing gear operation are located on just one side of boat.
Overview of Energy Systems' safety analysis report programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-03-01
The primary purpose of an Safety Analysis Report (SAR) is to provide a basis for judging the adequacy of a facility's safety. The SAR documents the safety analyses that systematically identify the hazards posed by the facility, analyze the consequences and risk of potential accidents, and describe hazard control measures that protect the health and safety of the public and employees. In addition, some SARs document, as Technical Safety Requirements (TSRs, which include Technical Specifications and Operational Safety Requirements), technical and administrative requirements that ensure the facility is operated within prescribed safety limits. SARs also provide conveniently summarized information thatmore » may be used to support procedure development, training, inspections, and other activities necessary to facility operation. This Overview of Energy Systems Safety Analysis Report Programs'' Provides an introduction to the programs and processes used in the development and maintenance of the SARs. It also summarizes some of the uses of the SARs within Energy Systems and DOE.« less
Overview of Energy Systems` safety analysis report programs. Safety Analysis Report Update Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-03-01
The primary purpose of an Safety Analysis Report (SAR) is to provide a basis for judging the adequacy of a facility`s safety. The SAR documents the safety analyses that systematically identify the hazards posed by the facility, analyze the consequences and risk of potential accidents, and describe hazard control measures that protect the health and safety of the public and employees. In addition, some SARs document, as Technical Safety Requirements (TSRs, which include Technical Specifications and Operational Safety Requirements), technical and administrative requirements that ensure the facility is operated within prescribed safety limits. SARs also provide conveniently summarized information thatmore » may be used to support procedure development, training, inspections, and other activities necessary to facility operation. This ``Overview of Energy Systems Safety Analysis Report Programs`` Provides an introduction to the programs and processes used in the development and maintenance of the SARs. It also summarizes some of the uses of the SARs within Energy Systems and DOE.« less
Highly immersive virtual reality laparoscopy simulation: development and future aspects.
Huber, Tobias; Wunderling, Tom; Paschold, Markus; Lang, Hauke; Kneist, Werner; Hansen, Christian
2018-02-01
Virtual reality (VR) applications with head-mounted displays (HMDs) have had an impact on information and multimedia technologies. The current work aimed to describe the process of developing a highly immersive VR simulation for laparoscopic surgery. We combined a VR laparoscopy simulator (LapSim) and a VR-HMD to create a user-friendly VR simulation scenario. Continuous clinical feedback was an essential aspect of the development process. We created an artificial VR (AVR) scenario by integrating the simulator video output with VR game components of figures and equipment in an operating room. We also created a highly immersive VR surrounding (IVR) by integrating the simulator video output with a [Formula: see text] video of a standard laparoscopy scenario in the department's operating room. Clinical feedback led to optimization of the visualization, synchronization, and resolution of the virtual operating rooms (in both the IVR and the AVR). Preliminary testing results revealed that individuals experienced a high degree of exhilaration and presence, with rare events of motion sickness. The technical performance showed no significant difference compared to that achieved with the standard LapSim. Our results provided a proof of concept for the technical feasibility of an custom highly immersive VR-HMD setup. Future technical research is needed to improve the visualization, immersion, and capability of interacting within the virtual scenario.
Aquifer-yield continuum as a guide and typology for science-based groundwater management
NASA Astrophysics Data System (ADS)
Pierce, Suzanne A.; Sharp, John M.; Guillaume, Joseph H. A.; Mace, Robert E.; Eaton, David J.
2013-03-01
Groundwater availability is at the core of hydrogeology as a discipline and, simultaneously, the concept is the source of ambiguity for management and policy. Aquifer yield has undergone multiple definitions resulting in a range of scientific methods to calculate and model availability reflecting the complexity of combined scientific, management, policy, and stakeholder processes. The concept of an aquifer-yield continuum provides an approach to classify groundwater yields along a spectrum, from non-use through permissive sustained, sustainable, maximum sustained, safe, permissive mining to maximum mining yields, that builds on existing literature. Additionally, the aquifer-yield continuum provides a systems view of groundwater availability to integrate physical and social aspects in assessing management options across aquifer settings. Operational yield describes the candidate solutions for operational or technical implementation of policy, often relating to a consensus yield that incorporates human dimensions through participatory or adaptive governance processes. The concepts of operational and consensus yield address both the social and the technical nature of science-based groundwater management and governance.
ERIC Educational Resources Information Center
Anderson, Daniel; Alonzo, Julie; Tindal, Gerald
2012-01-01
The purpose of this technical report is to document the piloting and scaling of new easyCBM mathematics test items aligned with the Common Core State Standards (CCSS) and to describe the process used to revise and supplement the 2012 research version easyCBM CCSS math tests in Grades 6-8. For all operational 2012 research version test forms (10…
NASA Technical Reports Server (NTRS)
Youngblood, Robert; Dezfuli, Homayoon; Siu, Nathan
2010-01-01
In late 2009, the National Aeronautics and Space Administration (NASA) and the U.S. Nuclear Regulatory Commission (NRC) jointly organized a workshop to discuss technical issues associated with application of risk assessments to early phases of system design. The workshop, which was coordinated by the Idaho National Laboratory, involved invited presentations from a number of PRA experts in the aerospace and nuclear fields and subsequent discussion to address the following questions: (a) What technical issues limit decision-makers' confidence in PRA results, especially at a pre-operational phase of the system life cycle? (b) What is being done to address these issues'? (c) What more can be done ? The workshop resulted in participant observations and suggestions on several technical issues, including the pursuit of non-traditional approaches to risk assessment and the verification and validation of risk models. The workshop participants also identified several important non-technical issues, including risk communication with decision makers, and the integration of PRA into the overall design process.
RoMPS concept review automatic control of space robot
NASA Technical Reports Server (NTRS)
1991-01-01
The Robot operated Material Processing in Space (RoMPS) experiment is being performed to explore the marriage of two emerging space commercialization technologies: materials processing in microgravity and robotics. This concept review presents engineering drawings and limited technical descriptions of the RoMPS programs' electrical and software systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zank, G.D.
1989-05-01
The relationship between strategic offensive capabilities (reflected in the SIOP) and emerging strategic defensive capabilities (reflected by SDI) is not being adequately addressed. A summary of the existing nuclear war planning process is provided, and an analagous defensive process is postulated. Parallels and differences between the two processes are discussed. Potential areas for information exchange and cooperation are identified to enhance deterrence and improve war fighting potential. Operational, technical and political issues requiring resolution are raised and recommendations to resolve these issues are made.
Opals: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS
NASA Technical Reports Server (NTRS)
Abrahamson, Matthew J.; Sindiy, Oleg V.; Oaida, Bogdan V.; Fregoso, Santos; Bowles-Martinez, Jessica N.; Kokorowski, Michael; Wilkerson, Marcus W.; Konyha, Alexander L.
2014-01-01
In April of 2014, the Optical PAyload for Lasercomm Science (OPALS) Flight System (FS) launched to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a planned 90-day baseline mission, the OPALS FS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) ground station in Wrightwood, California. Interfaces to the ISS payload operations infrastructure have been established to facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes, such as pointing prediction and data processing, satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The ORTs have provided valuable insight into operational considerations for the instrument on the ISS.
NASA Technical Reports Server (NTRS)
Cleaveland, Rance; Luettgen, Gerald; Bushnell, Dennis M. (Technical Monitor)
2002-01-01
This paper presents the Logical Process Calculus (LPC), a formalism that supports heterogeneous system specifications containing both operational and declarative subspecifications. Syntactically, LPC extends Milner's Calculus of Communicating Systems with operators from the alternation-free linear-time mu-calculus (LT(mu)). Semantically, LPC is equipped with a behavioral preorder that generalizes Hennessy's and DeNicola's must-testing preorder as well as LT(mu's) satisfaction relation, while being compositional for all LPC operators. From a technical point of view, the new calculus is distinguished by the inclusion of: (1) both minimal and maximal fixed-point operators and (2) an unimple-mentability predicate on process terms, which tags inconsistent specifications. The utility of LPC is demonstrated by means of an example highlighting the benefits of heterogeneous system specification.
NASA Technical Reports Server (NTRS)
Fargion, Giulietta S.; McClain, Charles R.; Busalacchi, Antonio J. (Technical Monitor)
2001-01-01
The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRAI) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.
Construction of In-house Databases in a Corporation
NASA Astrophysics Data System (ADS)
Sano, Hikomaro
This report outlines “Repoir” (Report information retrieval) system of Toyota Central R & D Laboratories, Inc. as an example of in-house information retrieval system. The online system was designed to process in-house technical reports with the aid of a mainframe computer and has been in operation since 1979. Its features are multiple use of the information for technical and managerial purposes and simplicity in indexing and data input. The total number of descriptors, specially selected for the system, was minimized for ease of indexing. The report also describes the input items, processing flow and typical outputs in kanji letters.
ERIC Educational Resources Information Center
Berardi, Victor L.
2012-01-01
Using information systems to solve business problems is increasingly required of everyone in an organization, not just technical specialists. In the operations management class, spreadsheet usage has intensified with the focus on building decision models to solve operations management concerns such as forecasting, process capability, and inventory…
Applying Early Systems Engineering: Injecting Knowledge into the Capability Development Process
2012-10-01
involves early use of systems engi- neering and technical analyses to supplement the existing operational analysis techniques currently used in...complexity, and costs of systems now being developed require tight coupling between operational requirements stated in the CDD, system requirements...Fleischer » Keywords: Capability Development, Competitive Prototyping, Knowledge Points, Early Systems Engineering Applying Early Systems
Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramuhalli, Pradeep; Devanathan, Ram; Meyer, Ryan M.
As U.S. nuclear power plants look to subsequent license renewal (SLR) to operate for a 20-year period beyond 60 years, the U.S. Nuclear Regulatory Commission and the industry will be addressing technical issues around the capability of long-lived passive components to meet their functionality objectives. A key challenge will be to better understand likely materials degradation mechanisms in these components and their impacts on component functionality and margins to safety. Research addressing many of the remaining technical gaps in these areas for SLR may greatly benefit from materials sampled from plants (decommissioned or operating). Because of the cost and inefficiencymore » of piecemeal sampling, there is a need for a strategic and systematic approach to sampling materials from structures, systems, and components (SSC) in both operating and decommissioned plants. This document describes a potential approach for sampling (harvesting) materials that focuses on prioritizing materials for sampling using a number of criteria. These criteria are based on an evaluation of technical gaps identified in the literature, research needs to address these technical gaps, and lessons learned from previous harvesting campaigns. The document also describes a process for planning future harvesting campaigns; such a plan would include an understanding of the harvesting priorities, available materials, and the planned use of the materials to address the technical gaps.« less
NASA Technical Reports Server (NTRS)
Gandin, Charles-Andre; Ratke, Lorenz
2008-01-01
The Materials Science Laboratory - Columnar-to-Equiaxed Transition in Solidification Processing and Microstructure Formation in Casting of Technical Alloys under Diffusive and Magnetically Controlled Convective Conditions (MSL-CETSOL and MICAST) are two investigations which supports research into metallurgical solidification, semiconductor crystal growth (Bridgman and zone melting), and measurement of thermo-physical properties of materials. This is a cooperative investigation with the European Space Agency (ESA) and National Aeronautics and Space Administration (NASA) for accommodation and operation aboard the International Space Station (ISS). Research Summary: Materials Science Laboratory - Columnar-to-Equiaxed Transition in Solidification Processing (CETSOL) and Microstructure Formation in Casting of Technical Alloys under Diffusive and Magnetically Controlled Convective Conditions (MICAST) are two complementary investigations which will examine different growth patterns and evolution of microstructures during crystallization of metallic alloys in microgravity. The aim of these experiments is to deepen the quantitative understanding of the physical principles that govern solidification processes in cast alloys by directional solidification.
ERIC Educational Resources Information Center
Sliva, William R.
1977-01-01
The size of modern dairy plant operations has led to extreme specialization in product manufacturing, milk processing, microbiological analysis, chemical and mathematical computations. Morrisville Agricultural and Technical College, New York, has modernized its curricula to meet these changes. (HD)
STAR Algorithm Integration Team - Facilitating operational algorithm development
NASA Astrophysics Data System (ADS)
Mikles, V. J.
2015-12-01
The NOAA/NESDIS Center for Satellite Research and Applications (STAR) provides technical support of the Joint Polar Satellite System (JPSS) algorithm development and integration tasks. Utilizing data from the S-NPP satellite, JPSS generates over thirty Environmental Data Records (EDRs) and Intermediate Products (IPs) spanning atmospheric, ocean, cryosphere, and land weather disciplines. The Algorithm Integration Team (AIT) brings technical expertise and support to product algorithms, specifically in testing and validating science algorithms in a pre-operational environment. The AIT verifies that new and updated algorithms function in the development environment, enforces established software development standards, and ensures that delivered packages are functional and complete. AIT facilitates the development of new JPSS-1 algorithms by implementing a review approach based on the Enterprise Product Lifecycle (EPL) process. Building on relationships established during the S-NPP algorithm development process and coordinating directly with science algorithm developers, the AIT has implemented structured reviews with self-contained document suites. The process has supported algorithm improvements for products such as ozone, active fire, vegetation index, and temperature and moisture profiles.
The ATLAS EventIndex: architecture, design choices, deployment and first operation experience
NASA Astrophysics Data System (ADS)
Barberis, D.; Cárdenas Zárate, S. E.; Cranshaw, J.; Favareto, A.; Fernández Casaní, Á.; Gallas, E. J.; Glasman, C.; González de la Hoz, S.; Hřivnáč, J.; Malon, D.; Prokoshin, F.; Salt Cairols, J.; Sánchez, J.; Többicke, R.; Yuan, R.
2015-12-01
The EventIndex is the complete catalogue of all ATLAS events, keeping the references to all files that contain a given event in any processing stage. It replaces the TAG database, which had been in use during LHC Run 1. For each event it contains its identifiers, the trigger pattern and the GUIDs of the files containing it. Major use cases are event picking, feeding the Event Service used on some production sites, and technical checks of the completion and consistency of processing campaigns. The system design is highly modular so that its components (data collection system, storage system based on Hadoop, query web service and interfaces to other ATLAS systems) could be developed separately and in parallel during LSI. The EventIndex is in operation for the start of LHC Run 2. This paper describes the high-level system architecture, the technical design choices and the deployment process and issues. The performance of the data collection and storage systems, as well as the query services, are also reported.
Coup d’Oeil: Military Geography and the Operational Level of War
1991-05-16
afUP D’OEIL Every day I feel nmre rnd more in need of an atlas, as geogrphvy iv the minutest details. is essential to a true nli "tary education. I...categorizing terrain have provided the essential prerequisites for the development of the IPB process. The process allows for an in-depth technical analysis of...is theater whiidch define the lines of essential to the c •umnrs plan. operation. ... defined by a conpetent authority. CENTER Zi f GRAVIMI Center of
Adding the Human Element to Ship Manoeuvring Simulations
NASA Astrophysics Data System (ADS)
Aarsæther, Karl Gunnar; Moan, Torgeir
Time-domain simulation of ship manoeuvring has been utilized in risk analysis to assess the effect of changes to the ship-lane, development in traffic volume and the associated risk. The process of ship manoeuvring in a wider socio-technical context consists of the technical systems, operational procedures, the human operators and support functions. Automated manoeuvring simulations without human operators in the simulation loop have often been preferred in simulation studies due to the low time required for simulations. Automatic control has represented the human element with little effort devoted to explain the relationship between the guidance and control algorithms and the human operator which they replace. This paper describes the development and application of a model for the human element for autonomous time-domain manoeuvring simulations. The method is applicable in the time-domain, modular and found to be capable of reproducing observed manoeuvre patterns, but limited to represent the intended behaviour.
NASA Astrophysics Data System (ADS)
Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan
2016-07-01
The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.
USDI DCS technical support: Mississippi Test Facility
NASA Technical Reports Server (NTRS)
Preble, D. M.
1975-01-01
The objective of the technical support effort is to provide hardware and data processing support to DCS users so that application of the system may be simply and effectively implemented. Technical support at Mississippi Test Facility (MTF) is concerned primarily with on-site hardware. The first objective of the DCP hardware support was to assure that standard measuring apparatus and techniques used by the USGS could be adapted to the DCS. The second objective was to try to standardize the miscellaneous variety of parameters into a standard instrument set. The third objective was to provide the necessary accessories to simplify the use and complement the capabilities of the DCP. The standard USGS sites have been interfaced and are presently operating. These sites are stream gauge, ground water level and line operated quality of water. Evapotranspiration, meteorological and battery operated quality of water sites are planned for near future DCP operation. Three accessories which are under test or development are the Chu antenna, solar power supply and add-on memory. The DCP has proven to be relatively easy to interface with many monitors. The large antenna is awkward to install and transport. The DCS has met the original requirements well; it has and is proving that an operation, satellite-based data collection system is feasible.
ACHP | Historic Preservation in Technical or Scientific Facilities
with the Operation of Highly Technical or Scientific Facilities Balancing Historic Preservation Needs with the Operation of Highly Technical or Scientific Facilities 1991; 79 pages; excerpt available Needs with the Operation of Highly Technical or Scientific Facilities considers the appropriate role of
76 FR 72885 - FM Asymmetric Sideband Operation and Associated Technical Studies
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-28
... Sideband Operation and Associated Technical Studies AGENCY: Federal Communications Commission. ACTION... Asymmetric Sideband Operation and Associated Technical Studies, MM Docket No. 99-325, Public Notice, DA 11-1832 (MB rel. Nov. 1, 2011). The iBiquity and NPR request and the iBiquity and NPR technical studies...
The George C. Marshall Space Flight Center High Reynolds Number Wind Tunnel Technical Handbook
NASA Technical Reports Server (NTRS)
Gwin, H. S.
1975-01-01
The High Reynolds Number Wind Tunnel at the George C. Marshall Space Flight Center is described. The following items are presented to illustrate the operation and capabilities of the facility: facility descriptions and specifications, operational and performance characteristics, model design criteria, instrumentation and data recording equipment, data processing and presentation, and preliminary test information required.
Challenges in building intelligent systems for space mission operations
NASA Technical Reports Server (NTRS)
Hartman, Wayne
1991-01-01
The purpose here is to provide a top-level look at the stewardship functions performed in space operations, and to identify the major issues and challenges that must be addressed to build intelligent systems that can realistically support operations functions. The focus is on decision support activities involving monitoring, state assessment, goal generation, plan generation, and plan execution. The bottom line is that problem solving in the space operations domain is a very complex process. A variety of knowledge constructs, representations, and reasoning processes are necessary to support effective human problem solving. Emulating these kinds of capabilities in intelligent systems offers major technical challenges that the artificial intelligence community is only beginning to address.
2016-11-15
During a ribbon cutting ceremony in the high bay of the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, center director Bob Cabana, far left, is joined by Bill Dowdell, Kennedy's International Space Station technical director, Josephine Burnett, director of Exploration Research and Technology, Andy Allen, Jacobs vice president and general manager and Test and Operations Support Contract program manager, and Jeff McAlear, Jacobs director of Processing Services. The event celebrated completion of facility modifications to improve processing and free up zones tailored to a variety of needs supporting a robust assortment of space-bound hardware including NASA programs and commercial space companies.
Method for Household Refrigerators Efficiency Increasing
NASA Astrophysics Data System (ADS)
Lebedev, V. V.; Sumzina, L. V.; Maksimov, A. V.
2017-11-01
The relevance of working processes parameters optimization in air conditioning systems is proved in the work. The research is performed with the use of the simulation modeling method. The parameters optimization criteria are considered, the analysis of target functions is given while the key factors of technical and economic optimization are considered in the article. The search for the optimal solution at multi-purpose optimization of the system is made by finding out the minimum of the dual-target vector created by the Pareto method of linear and weight compromises from target functions of the total capital costs and total operating costs. The tasks are solved in the MathCAD environment. The research results show that the values of technical and economic parameters of air conditioning systems in the areas relating to the optimum solutions’ areas manifest considerable deviations from the minimum values. At the same time, the tendencies for significant growth in deviations take place at removal of technical parameters from the optimal values of both the capital investments and operating costs. The production and operation of conditioners with the parameters which are considerably deviating from the optimal values will lead to the increase of material and power costs. The research allows one to establish the borders of the area of the optimal values for technical and economic parameters at air conditioning systems’ design.
Szasz, Peter; Louridas, Marisa; Harris, Kenneth A; Grantcharov, Teodor P
2017-08-01
Competency-based education necessitates assessments that determine whether trainees have acquired specific competencies. The evidence on the ability of internal raters (staff surgeons) to provide accurate assessments is mixed; however, this has not yet been directly explored in the operating room. This study's objective is to compare the ratings given by internal raters vs an expert external rater (independent to the training process) in the operating room. Raters assessed general surgery residents during a laparoscopic cholecystectomy for their technical and nontechnical performance. Fifteen cases were observed. There was a moderately positive correlation (r s = .618, P = .014) for technical performance and a strong positive correlation (r s = .731, P = .002) for nontechnical performance. The internal raters were less stringent for technical (mean rank 3.33 vs 8.64, P = .007) and nontechnical (mean rank 3.83 vs 8.50, P = .01) performances. This study provides evidence to help operationalize competency-based assessments. Copyright © 2016 Elsevier Inc. All rights reserved.
Proceedings of Technical Sessions, Volumes 1 and 2: the LACIE Symposium
NASA Technical Reports Server (NTRS)
1979-01-01
The technical design of the Large Area Crop Inventory Experiment is examined and data acquired over 3 global crop years is analyzed with respect to (1) sampling and aggregation; (2) growth size estimation; (3) classification and mensuration; (4) yield estimation; and (5) accuracy assessment. Seventy-nine papers delivered at conference sessions cover system implementation and operation; data processing systems; experiment results and accuracy; supporting research and technology; and the USDA application test system.
The Study of the Phase Characteristics of Bragg Cells for Acousto-Optic Signal Processing
1998-01-01
contractor will determine the relationship of phase characteristics between TeO2 and GaAs cells with their constructive and technical parameters. Design a...Braggcell TeO2 with minimal phase distortions operating near 100 MHz. Experimentally investigate the phase characteristics for a Bragg cell on TeO2 ...follows: The contractor will determine the relationship of phase characteristics between TeO2 and GaAs cells with their constructive and technical
SIMBIOS Project 1999 Annual Report
NASA Technical Reports Server (NTRS)
McClain, Charles R.; Fargion, Giulietta S.
1999-01-01
The purpose of this technical memorandum is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.
SIMBIOS Project 1998 Annual Report
NASA Technical Reports Server (NTRS)
McClain, Charles R.; Fargion, Giulietta, S.
1999-01-01
The purpose of this series of technical reports is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Ocean Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant to substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issues by an operational project.
Chemical Stockpile Disposal Program. Monitoring Concept Plan
1987-09-10
Government Owned Contractor Operated GPL General Population Limit H Bis (2-chloroethyl) sulfide or Levinstein Mustard (75% purity) P HCI Hydrogen Chloride... government agencies, will provide technical expertise and equipment necessary to monitor affected areas and resources. 2-25 SECTIO 3 PROCESS CONTROL AND...conditions and to issue correct emergency response notifications, if required. The process sensors work in conjunction with the process control system and
Naval Surface Warfare Center Crane Contracts Awarded Without Competition Were Adequately Justified
2012-04-24
Processed Data 13 Use of Technical Assistance 14 Prior Coverage 14 B. Federal Acquisition Regulation Criteria...are operating as intended and to evaluate the effectiveness of the controls. NSWC Crane’s internal controls over their processes for issuing the...consider the problem to be systemic and are not making a recommendation. Processes at NSWC Crane Facilitate Market Research Efforts NSWC Crane
Computerized engineering logic for nuclear procurement and dedication processes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tulay, M.P.
1996-12-31
In an attempt to better meet the needs of operations and maintenance organizations, many nuclear utility procurement engineering groups have simplified their procedures, developed on-line tools for performing the specification of replacement items, and developed relational databases containing part-level information necessary to automate the procurement process. Although these improvements have helped to reduce the engineering necessary to properly specify and accept/dedicate items for nuclear safety-related applications, a number of utilities have recognized that additional long-term savings can be realized by integrating a computerized logic to assist technical procurement engineering personnel. The most commonly used logic follows the generic processes containedmore » in Electric Power Research Institute (EPRI) published guidelines. The processes are typically customized to some extent to accommodate each utility`s organizational structure, operating procedures, and strategic goals. This paper will discuss a typical logic that integrates the technical evaluation, acceptance, and receipt inspection and testing processes. The logic this paper will describe has been successfully integrated at a growing number of nuclear utilities and has produced numerous positive results. The application of the logic ensures that utility-wide standards or procedures, common among multi-site utilities, are followed.« less
Continuous flow technology vs. the batch-by-batch approach to produce pharmaceutical compounds.
Cole, Kevin P; Johnson, Martin D
2018-01-01
For the manufacture of small molecule drugs, many pharmaceutical innovator companies have recently invested in continuous processing, which can offer significant technical and economic advantages over traditional batch methodology. This Expert Review will describe the reasons for this interest as well as many considerations and challenges that exist today concerning continuous manufacturing. Areas covered: Continuous processing is defined and many reasons for its adoption are described. The current state of continuous drug substance manufacturing within the pharmaceutical industry is summarized. Current key challenges to implementation of continuous manufacturing are highlighted, and an outlook provided regarding the prospects for continuous within the industry. Expert commentary: Continuous processing at Lilly has been a journey that started with the need for increased safety and capability. Over twelve years the original small, dedicated group has grown to more than 100 Lilly employees in discovery, development, quality, manufacturing, and regulatory designing in continuous drug substance processing. Recently we have focused on linked continuous unit operations for the purpose of all-at-once pharmaceutical manufacturing, but the technical and business drivers that existed in the very beginning for stand-alone continuous unit operations in hybrid processes have persisted, which merits investment in both approaches.
Generation of useful energy from process fluids using the biphase turbine
NASA Astrophysics Data System (ADS)
Helgeson, N. L.
1981-01-01
The six largest energy consuming industries in the United States were surveyed to determine the energy savings that could result from applying the Biphase turbine to industrial process streams. A national potential energy savings of 58 million barrels of oil per year (technical market) was identified. This energy is recoverable from flashing gas liquid process streams and is separate and distinct from exhaust gas waste heat recovery. The industries surveyed in this program were the petroleum chemical, primary metals, paper and pulp, stone-clay-glass, and food. It was required to determine the applicability of the Biphase turbine to flashing operations connected with process streams, to determine the energy changes associated with these flashes if carried out in a Biphase turbine, and to determine the suitability (technical and economical feasibility) of applying the Biphase turbine to these processes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anastasia M. Gribik; Ronald E. Mizia; Harry Gatley
This project addresses both the technical and economic feasibility of replacing industrial gas in lime kilns with synthesis gas from the gasification of hog fuel. The technical assessment includes a materials evaluation, processing equipment needs, and suitability of the heat content of the synthesis gas as a replacement for industrial gas. The economic assessment includes estimations for capital, construction, operating, maintenance, and management costs for the reference plant. To perform these assessments, detailed models of the gasification and lime kiln processes were developed using Aspen Plus. The material and energy balance outputs from the Aspen Plus model were used asmore » inputs to both the material and economic evaluations.« less
Crew Transportation Technical Management Processes
NASA Technical Reports Server (NTRS)
Mckinnie, John M. (Compiler); Lueders, Kathryn L. (Compiler)
2013-01-01
Under the guidance of processes provided by Crew Transportation Plan (CCT-PLN-1100), this document, with its sister documents, International Space Station (ISS) Crew Transportation and Services Requirements Document (CCT-REQ-1130), Crew Transportation Technical Standards and Design Evaluation Criteria (CCT-STD-1140), Crew Transportation Operations Standards (CCT STD-1150), and ISS to Commercial Orbital Transportation Services Interface Requirements Document (SSP 50808), provides the basis for a National Aeronautics and Space Administration (NASA) certification for services to the ISS for the Commercial Provider. When NASA Crew Transportation System (CTS) certification is achieved for ISS transportation, the Commercial Provider will be eligible to provide services to and from the ISS during the services phase.
Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho
Packard, F.A.
1996-01-01
To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality-assurance plan does not describe detailed technical activities that are commonly termed "quality-control procedures." Instead, it focuses on current policies, operations, and responsibilities that are implemented at the management level. Contents of the plan will be reviewed annually and updated as programs and operations change.
Defense Science and Technology Strategy
1994-09-01
I 3 IV. The Science and Technology Program .................... 15 Advanced Concept Technology Demomstrations...product and process concepts that pcrmit us to tailor, modify, and optimize the manufactUriiig process; develop sensors a-t i~a Mcrials that will detect...It can be used during concept formulations to expand the range of technical, operational, and system alternatives evaluated. The technology can
NASA Technical Reports Server (NTRS)
Miller, R. E., Jr.; Southall, J. W.; Kawaguchi, A. S.; Redhed, D. D.
1973-01-01
Reports on the design process, support of the design process, IPAD System design catalog of IPAD technical program elements, IPAD System development and operation, and IPAD benefits and impact are concisely reviewed. The approach used to define the design is described. Major activities performed during the product development cycle are identified. The computer system requirements necessary to support the design process are given as computational requirements of the host system, technical program elements and system features. The IPAD computer system design is presented as concepts, a functional description and an organizational diagram of its major components. The cost and schedules and a three phase plan for IPAD implementation are presented. The benefits and impact of IPAD technology are discussed.
Solar energy in California industry - Applications, characteristics and potential
NASA Technical Reports Server (NTRS)
Barbieri, R. H.; Pivirotto, D. S.
1978-01-01
Results of a survey to determine the potential applicability of solar thermal energy to industrial processes in California are presented. It is found that if the heat for all industrial processes at temperatures below 212 F were supplied by solar energy, total state energy consumption could be reduced by 100 trillion Btus (2%), while the use of solar energy in processes between 212 and 350 F could displace 500 trillion Btus. The issues and problems with which solar energy must contend are illustrated by a description of fluid milk processing operations. Solar energy application is found to be technically feasible for processes with thermal energy requirements below 212 F, with design, and degree of technical, economic and management feasibility being site specific. It is recommended that the state provide support for federal and industrial research, development and demonstration programs in order to stimulate acceptance of solar process heat application by industry.
The Power of Process Improvement
ERIC Educational Resources Information Center
Fairfield-Sonn, James W.; Morgan, Sandra; Sumukadas, Narendar
2004-01-01
Over the last several decades many systematic management approaches, such as Total Quality Management, aimed at improving organizational performance and employee satisfaction have captured organizations' attention. Given their origins in statistics, operations management, and engineering, many of the concepts and techniques are technical. When…
OSD CALS Architecture Master Plan Study. Concept Paper. Configuration Management. Volume 28
DOT National Transportation Integrated Search
1989-10-01
The mission of CALS is to enhance operational readiness of DoD weapon systems through application of information technology to the management of technical information. CALS will automate the current paper-intensive processes involved in weapon system...
Institutional Long Range Planning.
ERIC Educational Resources Information Center
Caldwell Community Coll. and Technical Inst., Lenoir, NC.
Long-range institutional planning has been in effect at Caldwell Community College and Technical Institute since 1973. The first step in the process was the identification of planning areas: administration, organization, educational programs, learning resources, student services, faculty, facilities, maintenance/operation, and finances. The major…
Behavioral Variability, Learning Processes, and Creativity
1990-09-01
Nursery Schools . ~ 9-10 y.o. subjects, at the concrete operative stage and coming from Primary Schools . - 14-15 y.o. subjects, at the formal thought...stage and coming from General Secondary Schools (no Technical School subject has been considered). - Adults, students at the University. Cognitive...classifications combine in a single situation, the operations of seiation and of classification, as approached in the classical Piaget’s procedures
The French Space Operation Act: Technical Regulations
NASA Astrophysics Data System (ADS)
Trinchero, J. P.; Lazare, B.
2010-09-01
The French Space Operation Act(FSOA) stipulates that a prime objective of the National technical regulations is to protect people, property, public health and the environment. Compliance with these technical regulations is mandatory as of 10 December 2010 for space operations by French space operators and for space operations from French territory. The space safety requirements and regulations governing procedures are based on national and international best practices and experience. A critical design review of the space system and procedures shall be carried out by the applicant, in order to verify compliance with the Technical Regulations. An independent technical assessment of the operation is delegated to CNES. The principles applied when drafting technical regulations are as follows: requirements must as far as possible establish the rules according to the objective to be obtained, rather than how it is to be achieved; requirements must give preference to international standards recognised as being the state of the art; requirements must take previous experience into account. Technical regulations are divided into three sections covering common requirements for the launch, control and return of a space object. A dedicated section will cover specific rules to be applied at the Guiana Space Centre. The main topics addressed by the technical regulations are: operator safety management system; study of risks to people, property, public health and the Earth’s environment; impact study on the outer space environment: space debris generated by the operation; planetary protection.
West Hackberry Tertiary Project. Quarterly technical progress report, July 1--September 30, 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The goal of the West Hackberry Tertiary Project is to demonstrate the technical and economic feasibility of combining air injection with the Double Displacement Process for tertiary oil recovery. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. The target reservoir for the project is the Camerina C-1,2,3 Sand located on the West Flank of West Hackberry Field in Cameron Parish, Louisiana. If successful, this project will demonstrate that the usemore » of air injection in the Double Displacement Process can economically recover oil in reservoirs where tertiary oil recovery is presented uneconomic. During this quarter, the West Hackberry Tertiary Project completed the first ten months of air injection operations. Plots of air injection rates and cumulative air injected are included in this report as attachments. The following events are reviewed in this quarter`s technical progress report: (1) successful workovers on the Gulf Land D Nos. 44, 45 and 51 and the Watkins No. 3; (2) the unsuccessful repair attempt on the Watkins No. 16; (3) gathering of additional bottom hole pressure data; (4) air compressor operations and repairs; and (5) technology transfer activities.« less
Hanford Waste Vitrification Plant technical manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larson, D.E.; Watrous, R.A.; Kruger, O.L.
1996-03-01
A key element of the Hanford waste management strategy is the construction of a new facility, the Hanford Waste Vitrification Plant (HWVP), to vitrify existing and future liquid high-level waste produced by defense activities at the Hanford Site. The HWVP mission is to vitrify pretreated waste in borosilicate glass, cast the glass into stainless steel canisters, and store the canisters at the Hanford Site until they are shipped to a federal geological repository. The HWVP Technical Manual (Manual) documents the technical bases of the current HWVP process and provides a physical description of the related equipment and the plant. Themore » immediate purpose of the document is to provide the technical bases for preparation of project baseline documents that will be used to direct the Title 1 and Title 2 design by the A/E, Fluor. The content of the Manual is organized in the following manner. Chapter 1.0 contains the background and context within which the HWVP was designed. Chapter 2.0 describes the site, plant, equipment and supporting services and provides the context for application of the process information in the Manual. Chapter 3.0 provides plant feed and product requirements, which are primary process bases for plant operation. Chapter 4.0 summarizes the technology for each plant process. Chapter 5.0 describes the engineering principles for designing major types of HWVP equipment. Chapter 6.0 describes the general safety aspects of the plant and process to assist in safe and prudent facility operation. Chapter 7.0 includes a description of the waste form qualification program and data. Chapter 8.0 indicates the current status of quality assurance requirements for the Manual. The Appendices provide data that are too extensive to be placed in the main text, such as extensive tables and sets of figures. The Manual is a revision of the 1987 version.« less
Fecso, A B; Kuzulugil, S S; Babaoglu, C; Bener, A B; Grantcharov, T P
2018-03-30
The operating theatre is a unique environment with complex team interactions, where technical and non-technical performance affect patient outcomes. The correlation between technical and non-technical performance, however, remains underinvestigated. The purpose of this study was to explore these interactions in the operating theatre. A prospective single-centre observational study was conducted at a tertiary academic medical centre. One surgeon and three fellows participated as main operators. All patients who underwent a laparoscopic Roux-en-Y gastric bypass and had the procedures captured using the Operating Room Black Box ® platform were included. Technical assessment was performed using the Objective Structured Assessment of Technical Skills and Generic Error Rating Tool instruments. For non-technical assessment, the Non-Technical Skills for Surgeons (NOTSS) and Scrub Practitioners' List of Intraoperative Non-Technical Skills (SPLINTS) tools were used. Spearman rank-order correlation and N-gram statistics were conducted. Fifty-six patients were included in the study and 90 procedural steps (gastrojejunostomy and jejunojejunostomy) were analysed. There was a moderate to strong correlation between technical adverse events (r s = 0·417-0·687), rectifications (r s = 0·380-0·768) and non-technical performance of the surgical and nursing teams (NOTSS and SPLINTS). N-gram statistics showed that after technical errors, events and prior rectifications, the staff surgeon and the scrub nurse exhibited the most positive non-technical behaviours, irrespective of operator (staff surgeon or fellow). This study demonstrated that technical and non-technical performances are related, on both an individual and a team level. Valuable data can be obtained around intraoperative errors, events and rectifications. © 2018 BJS Society Ltd Published by John Wiley & Sons Ltd.
Human Spaceflight Safety for the Next Generation on Orbital Space Systems
NASA Technical Reports Server (NTRS)
Mango, Edward J.
2011-01-01
The National Aeronautics and Space Administration (NASA) Commercial Crew Program (CCP) has been chartered to facilitate the development of a United States (U.S.) commercial crew space transportation capability with the goal of achieving safe, reliable, and cost effective access to and from low Earth orbit (LEO) and the International Space Station (ISS) as soon as possible. Once the capability is matured and is available to the Government and other customers, NASA expects to purchase commercial services to meet its ISS crew rotation and emergency return objectives. The primary role of the CCP is to enable and ensure safe human spaceflight and processes for the next generation of earth orbital space systems. The architecture of the Program delineates the process for investment performance in safe orbital systems, Crew Transportation System (CTS) certification, and CTS Flight Readiness. A series of six technical documents build up the architecture to address the top-level CTS requirements and standards. They include Design Reference Missions, with the near term focus on ISS crew services, Certification and Service Requirements, Technical Management Processes, and Technical and Operations Standards Evaluation Processes.
Production of Magnesium and Aluminum-Magnesium Alloys from Recycled Secondary Aluminum Scrap Melts
NASA Astrophysics Data System (ADS)
Gesing, Adam J.; Das, Subodh K.; Loutfy, Raouf O.
2016-02-01
An experimental proof of concept was demonstrated for a patent-pending and trademark-pending RE12™ process for extracting a desired amount of Mg from recycled scrap secondary Al melts. Mg was extracted by electrorefining, producing a Mg product suitable as a Mg alloying hardener additive to primary-grade Al alloys. This efficient electrorefining process operates at high current efficiency, high Mg recovery and low energy consumption. The Mg electrorefining product can meet all the impurity specifications with subsequent melt treatment for removing alkali contaminants. All technical results obtained in the RE12™ project indicate that the electrorefining process for extraction of Mg from Al melt is technically feasible. A techno-economic analysis indicates high potential profitability for applications in Al foundry alloys as well as beverage—can and automotive—sheet alloys. The combination of technical feasibility and potential market profitability completes a successful proof of concept. This economical, environmentally-friendly and chlorine-free RE12™ process could be disruptive and transformational for the Mg production industry by enabling the recycling of 30,000 tonnes of primary-quality Mg annually.
Comprehensive assessment of the L-lysine production process from fermentation of sugarcane molasses.
Anaya-Reza, Omar; Lopez-Arenas, Teresa
2017-07-01
L-Lysine is an essential amino acid that can be produced by chemical processes from fossil raw materials, as well as by microbial fermentation, the latter being a more efficient and environmentally friendly procedure. In this work, the production process of L-lysine-HCl is studied using a systematic approach based on modeling and simulation, which supports decision making in the early stage of process design. The study considers two analysis stages: first, the dynamic analysis of the fermentation reactor, where the conversion of sugars from sugarcane molasses to L-lysine with a strain of Corynebacterium glutamicum is carried out. In this stage, the operation mode (either batch or fed batch) and operating conditions of the fermentation reactor are defined to reach the maximum technical criteria. Afterwards, the second analysis stage relates to the industrial production process of L-lysine-HCl, where the fermentation reactor, upstream processing, and downstream processing are included. In this stage, the influence of key parameters on the overall process performance is scrutinized through the evaluation of several technical, economic, and environmental criteria, to determine a profitable and sustainable design of the L-lysine production process. The main results show how the operating conditions, process design, and selection of evaluation criteria can influence in the conceptual design. The best plant design shows maximum product yield (0.31 g L-lysine/g glucose) and productivity (1.99 g/L/h), achieving 26.5% return on investment (ROI) with a payback period (PBP) of 3.8 years, decreasing water and energy consumption, and with a low potential environmental impact (PEI) index.
NASA Technical Reports Server (NTRS)
Scholz, A. L.; Hart, M. T.; Lowry, D. J.
1987-01-01
The Technology Information Sheet was assembled in database format during Phase I. This document was designed to provide a repository for information pertaining to 144 Operations and Maintenance Instructions (OMI) controlled operations in the Orbiter Processing Facility (OPF), Vehicle Assembly Building (VAB), and PAD. It provides a way to accumulate information about required crew sizes, operations task time duration (serial and/or parallel), special Ground Support Equipment (GSE). required, and identification of a potential application of existing technology or the need for the development of a new technolgoy item.
Development of Integrated Programs for Aerospace-vehicle design (IPAD): Reference design process
NASA Technical Reports Server (NTRS)
Meyer, D. D.
1979-01-01
The airplane design process and its interfaces with manufacturing and customer operations are documented to be used as criteria for the development of integrated programs for the analysis, design, and testing of aerospace vehicles. Topics cover: design process management, general purpose support requirements, design networks, and technical program elements. Design activity sequences are given for both supersonic and subsonic commercial transports, naval hydrofoils, and military aircraft.
The Effect of Technical Performance on Patient Outcomes in Surgery: A Systematic Review.
Fecso, Andras B; Szasz, Peter; Kerezov, Georgi; Grantcharov, Teodor P
2017-03-01
Systematic review of the effect of intraoperative technical performance on patient outcomes. The operating room is a high-stakes, high-risk environment. As a result, the quality of surgical interventions affecting patient outcomes has been the subject of discussion and research for years. MEDLINE, EMBASE, PsycINFO, and Cochrane databases were searched. All surgical specialties were eligible for inclusion. Data were reviewed in regards to the methods by which technical performance was measured, what patient outcomes were assessed, and how intraoperative technical performance affected patient outcomes. Quality of evidence was assessed using the Medical Education Research Study Quality Instrument (MERSQI). Of the 12,758 studies initially identified, 24 articles (7775 total participants) were ultimately included in this review. Seventeen studies assessed the performance of the faculty alone, 2 assessed both the faculty and trainees, 1 assessed trainees alone, and in 4 studies, the level of the operating surgeon was not specified. In 18 studies, a performance assessment tool was used. Patient outcomes were evaluated using intraoperative complications, short-term morbidity, long-term morbidity, short-term mortality, and long-term mortality. The average MERSQI score was 11.67 (range 9.5-14.5). Twenty-one studies demonstrated that superior technical performance was related to improved patient outcomes. The results of this systematic review demonstrated that superior technical performance positively affects patient outcomes. Despite this initial evidence, more robust research is needed to directly assess intraoperative technical performance and its effect on postoperative patient outcomes using meaningful assessment instruments and reliable processes.
ERIC Educational Resources Information Center
Agenbroad, James E.; And Others
Included in this volume of appendices to LI 000 979 are acquisitions flow charts; a current operations questionnaire; an algorithm for splitting the Library of Congress call number; analysis of the Machine-Readable Cataloging (MARC II) format; production problems and decisions; operating procedures for information transmittal in the New England…
NASA Technical Reports Server (NTRS)
Gill, Paul S.; Garcia, Danny; Vaughan, William W.; Parker, Nelson C. (Technical Monitor)
2002-01-01
The National Aeronautics and Space Agency consists of fourteen Facilities throughout the United States. They are organized to support the Agency's principal Enterprises: (1) Space Science, (2) Earth Science, (3) Aerospace Technology, (4) Human Exploration and Development of Space, and (5) Biological and Physical Research. Technical Standards are important to the activities of each Enterprise and have been an integral part in the development and operation of NASA Programs and Projects since the Agency was established in 1959. However, for years each Center was responsible for its own standards development and selection of non-NASA technical standards that met the needs of Programs and Projects for which they were responsible. There were few Agencywide applicable Technical Standards, mainly those in area of safety. Department of Defense Standards and Specifications were the foundation and main source for Technical Standards used by the Agency. This process existed until about 1997 when NASA embarked on a Program to convert NASA's Center-developed Technical Standards into Agencywide endorsed NASA Preferred Technical Standards. In addition, action was taken regarding the formal adoption of non-NASA Technical Standards (DOD, SAE, ASTM, ASME, IEEE, etc.) as NASA Preferred Technical Standards.
MODIS Validation, Data Merger and Other Activities Accomplished by the SIMBIOS Project: 2002-2003
NASA Technical Reports Server (NTRS)
Fargion, Giulietta S.; McClain, Charles R.
2003-01-01
The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, satellite data processing, and data product validation. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report focuses on the SIMBIOS Project s efforts in support of the Moderate-Resolution Imaging Spectroradiometer (MODIS) on the Earth Observing System (EOS) Terra platform (similar evaluations of MODIS/Aqua are underway). This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, H.E.
1981-08-01
The plant was in operation for the equivalent of 247 days, an on-stream factor of 67.7%. Kentucky 9 coals from the Lafayette, Dotiki and Fies mines were processed. During 1980, the operating conditions and equipment were adjusted to evaluate potential process improvements. These experiments produced significant results in the following areas: Operating V103 High Pressure Separator in the hot mode; varying T102 Vacuum Column operating temperature; adding light SRC (LSRC), a product of the third stage of the Critical Solvent Deashing (CSD) unit, to the process solvent; investigating the effects of the chlorine content of the feed coal on corrosionmore » in the process vessels; evaluating the effects of adding sodium carbonate on corrosion rates; operating under conditions of low severity; i.e., low reactor temperature and long residence time; and testing an alternate CSD deashing solvent. A series of simulation runs investigating the design operating conditions for a planned 6000 ton per day SRC-I demonstation plant were also completed. Numerous improvements were made in the CSD processing area, and the components for a hydrotreating unit were installed.« less
Capability Gap Assessment - Blending Warfighter Experience with Science
2013-02-15
This technical report describes the gap assessment method and the results of using it. 15. SUBJECT TERMS capability gap assessment, operational risk ...29 Challenges ...approach that blends warfighter experience with science. This paper describes the process, challenges , and opportunities associated with this technique
NASA Astrophysics Data System (ADS)
Dyachenko, F. V.; Petrova, T. I.
2017-11-01
Efficiency and reliability of the equipment in fossil power plants as well as in combined cycle power plants depend on the corrosion processes and deposit formation in steam/water circuit. In order to decrease these processes different water chemistries are used. Today the great attention is being attracted to the application of film forming amines and film forming amine products. The International Association for the Properties of Water and Steam (IAPWS) consolidated the information from all over the World, and based on the research studies and operating experience of researchers and engineers from 21 countries, developed and authorized the Technical Guidance Document: “Application of Film Forming Amines in Fossil, Combined Cycle, and Biomass Power Plants” in 2016. This article describe Russian and International technical guidance documents for the cycle water chemistries based on film forming amines at fossil and combined cycle power plants.
Technical Assessment of the National Full Scale Aerodynamic Complex Fan Blades Repair
NASA Technical Reports Server (NTRS)
Young, Clarence P., Jr.; Dixon, Peter G.; St.Clair, Terry L.; Johns, William E.
1998-01-01
This report describes the principal activities of a technical review team formed to address National Full Scale Aerodynamic Complex (NFAC) blade repair problems. In particular, the problem of lack of good adhesive bonding of the composite overwrap to the Hyduliginum wood blade material was studied extensively. Description of action plans and technical elements of the plans are provided. Results of experiments designed to optimize the bonding process and bonding strengths obtained on a full scale blade using a two-step cure process with adhesive primers are presented. Consensus recommendations developed by the review team in conjunction with the NASA Ames Fan Blade Repair Project Team are provided along with lessons learned on this program. Implementation of recommendations resulted in achieving good adhesive bonds between the composite materials and wooden blades, thereby providing assurance that the repaired fan blades will meet or exceed operational life requirements.
NASA Technical Reports Server (NTRS)
Goldman, H.; Wolf, M.
1978-01-01
Several experimental and projected Czochralski crystal growing process methods were studied and compared to available operations and cost-data of recent production Cz-pulling, in order to elucidate the role of the dominant cost contributing factors. From this analysis, it becomes apparent that substantial cost reductions can be realized from technical advancements which fall into four categories: an increase in furnace productivity; the reduction of crucible cost through use of the crucible for the equivalent of multiple state-of-the-art crystals; the combined effect of several smaller technical improvements; and a carry over effect of the expected availability of semiconductor grade polysilicon at greatly reduced prices. A format for techno-economic analysis of solar cell production processes was developed, called the University of Pennsylvania Process Characterization (UPPC) format. The accumulated Cz process data are presented.
Improving and monitoring air quality.
DuPont, André
2018-05-01
Since the authorization of the Clean Air Act Amendments of 1990, the air quality in the USA has significantly improved because of strong public support. The lessons learned over the last 25 years are being shared with the policy analysts, technical professionals, and scientist who endeavor to improve air quality in their communities. This paper will review how the USA has achieved the "high" standard of air quality that was envisioned in the early 1990s. This document will describe SO 2 gas emission reduction technology and highlight operation of emission monitoring technology. This paper describes the basic process operation of an air pollution control scrubber. A technical review of measures required to operate and maintain a large-scale pollution control system will be described. Also, the author explains how quality assurance procedures in performance of continuous emission monitoring plays a significant role in reducing air pollution.
When do drilling alliances add value? The alliance value model
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brett, J.F.; Craig, V.B.; Wadsworth, D.B.
1996-12-31
A recent GRI report details three previously unstudied aspects of alliances: specific measurable factors that improve alliance success, how a successful alliance should be structured, and when an alliance makes economic sense. The most innovative tool to emerge from the report, the Alliance Value Model, addresses the third aspect. The theory behind the Alliance Value Model is that the long-term viability of any drilling relationship hinges on its ability to create real value and achieve stability. Based upon the report`s findings, the most effective way to form such an alliance is through a detailed description and integration of the technicalmore » processes involved. This new type of process-driven alliance is characterized by a value chain which links together a common set of technical processes, mutually defined bottomline goals, and shared benefits. Building a process-driven alliance requires time and people and therefore has an associated cost. The real value generated by an alliance must exceed this start-up cost. The Alliance Value Model computes the net present value (NPV) of the cash flows for four different operating arrangements: (1) Business As Usual (conventional competitive bidding process), (2) Process-Driven Alliance (linking technical processes to accelerate production and reduce expenses), (3) Incentivized Process-Driven Alliance (linked technical processes with performance incentives to promote stability), and (4) No Drill Case (primarily used to gauge the market value of services). These arrangements test different degrees of process integration between an operator and its suppliers. They can also help determine if the alliance can add enough value to exceed startup costs and if the relationship will be stable. Each partner can test the impact of the relational structure on its own profitability. When an alliance is warranted, all participants can benefit from real value generated in a stable relationship.« less
2006-11-06
operational environment -1 No operational boundaries Pervasiveness of technology Expanding and rapidly changing risk profile High dependency on upstream...partners Successes are short-lived Skills have shorter longevity Less resources, more demands 5 © 2006 Carnegie Mellon University y Resiliency...involved Usually bolted on as an afterthought Security seen as technical problem Searching for magic bullet: CobiT , ITIL, ISO17799 Poorly defined and
ISS Crew Transportation and Services Requirements Document
NASA Technical Reports Server (NTRS)
Lueders, Kathryn L. (Compiler)
2015-01-01
Under the guidance of processes provided by Crew Transportation Plan (CCT-PLN-1100), this document with its sister documents, Crew Transportation Technical Management Processes (CCT-PLN-1120), Crew Transportation Technical Standards and Design Evaluation Criteria (CCT-STD-1140), and Crew Transportation Operations Standards (CCT-STD-1150), and International Space Station (ISS) to Commercial Orbital Transportation Services Interface Requirements Document (SSP 50808), provides the basis for a National Aeronautics and Space Administration (NASA) certification for services to the ISS for the Commercial Provider. When NASA Crew Transportation System (CTS) certification is achieved for ISS transportation, the Commercial Provider will be eligible to provide services to and from the ISS during the services phase of the NASA Commercial Crew Program (CCP).
NASA Astrophysics Data System (ADS)
Makhotkina, L. Yu; Khristoliubova, V. I.
2017-11-01
The main aim of the work is to solve the actual problem of increasing the competitiveness of tanning products by reducing the prime cost and improving the quality of finished products due to the increased durability of the working elements of tanneries. The impact of the low pressure radio frequency (RF) plasma in the processes of treating for modification of the materials for special purposes is considered in the article. The results of working elements of tanneries and the materials for special purposes sample processing by a RF low pressure plasma are described. As a result of leather materials nano structuring and nano modifying physical, mechanical and hygienic characteristics were increased. Processing of the technical purpose materials allows to increase operational performance of products and extend their lifespan.
NASA Technical Reports Server (NTRS)
Taylor, Leslie A.
1993-01-01
Technical innovations have converged with the exploding market demand for mobile telecommunications to create the impetus for low-earth orbit (LEO) communications satellite systems. The so-called 'Little LEO's' propose use of VHF and UHF spectrum to provide position - location and data messaging services. The so-called 'Big LEO's' propose to utilize the RDSS bands to provide voice and data services. In the United States, several applications were filed with the U.S. Federal Communications Commission (FCC) to construct and operate these mobile satellite systems. To enable the prompt introduction of such new technology services, the FCC is using innovative approaches to process the applications. Traditionally, when the FCC is faced with 'mutually exclusive' applications, e.g. a grant of one would preclude a grant of the others, it uses selection mechanisms such as comparative hearings or lotteries. In the case of the LEO systems, the FCC has sought to avoid these time-consuming approaches by using negotiated rulemakings. The FCC's objective is to enable the multiple applicants and other interested parties to agree on technical and service rules which will enable the grant of all qualified applications. With regard to the VHF/UHF systems, the Advisory Committee submitted a consensus report to the FCC. The process for the systems operating in the bands above 1 GHz involved more parties and more issues but still provided the FCC useful technical information to guide the adoption of rules for the new mobile satellite service.
NASA Astrophysics Data System (ADS)
Taylor, Leslie A.
Technical innovations have converged with the exploding market demand for mobile telecommunications to create the impetus for low-earth orbit (LEO) communications satellite systems. The so-called 'Little LEO's' propose use of VHF and UHF spectrum to provide position - location and data messaging services. The so-called 'Big LEO's' propose to utilize the RDSS bands to provide voice and data services. In the United States, several applications were filed with the U.S. Federal Communications Commission (FCC) to construct and operate these mobile satellite systems. To enable the prompt introduction of such new technology services, the FCC is using innovative approaches to process the applications. Traditionally, when the FCC is faced with 'mutually exclusive' applications, e.g. a grant of one would preclude a grant of the others, it uses selection mechanisms such as comparative hearings or lotteries. In the case of the LEO systems, the FCC has sought to avoid these time-consuming approaches by using negotiated rulemakings. The FCC's objective is to enable the multiple applicants and other interested parties to agree on technical and service rules which will enable the grant of all qualified applications. With regard to the VHF/UHF systems, the Advisory Committee submitted a consensus report to the FCC. The process for the systems operating in the bands above 1 GHz involved more parties and more issues but still provided the FCC useful technical information to guide the adoption of rules for the new mobile satellite service.
Streamlining and Standardizing Due Diligence to Ensure Quality of PV Power Plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kurtz, Sarah
Those investing in PV power plants would like to have confidence that the plants will provide the anticipated return on investment. While due diligence is capably performed by independent engineers today, as PV systems mature, there will be benefit in standardization and streamlining of this process. The IECRE has defined technical information that is needed as a basis for each transaction step such as approving a design to begin construction, documenting readiness to operate, quantifying performance after a year of operation, and assessing the health of the plant in preparation for sale of the plant. The technical requirements have beenmore » defined by IEC Technical Committee 82 and have been designed to be both effective and efficient in completing the assessments. This workshop will describe these new tools that are now available to the community and will include a panel/audience discussion about how and when they can be most effectively used.« less
Configuration Management Plan for K Basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weir, W.R.; Laney, T.
This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less
Possibilities of Use of UAVS for Technical Inspection of Buildings and Constructions
NASA Astrophysics Data System (ADS)
Banaszek, Anna; Banaszek, Sebastian; Cellmer, Anna
2017-12-01
In recent years, Unmanned Aerial Vehicles (UAVs) have been used in various sectors of the economy. This is due to the development of new technologies for acquiring and processing geospatial data. The paper presents the results of experiments using UAV, equipped with a high resolution digital camera, for a visual assessment of the technical condition of the building roof and for the inventory of energy infrastructure and its surroundings. The usefulness of digital images obtained from the UAV deck is presented in concrete examples. The use of UAV offers new opportunities in the area of technical inspection due to the detail and accuracy of the data, low operating costs and fast data acquisition.
Nuclear Technology Series. Course 7: Reactor Operations.
ERIC Educational Resources Information Center
Center for Occupational Research and Development, Inc., Waco, TX.
This technical specialty course is one of thirty-five courses designed for use by two-year postsecondary institutions in five nuclear technician curriculum areas: (1) radiation protection technician, (2) nuclear instrumentation and control technician, (3) nuclear materials processing technician, (4) nuclear quality-assurance/quality-control…
Performance evaluation approach for the supercritical helium cold circulators of ITER
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vaghela, H.; Sarkar, B.; Bhattacharya, R.
2014-01-29
The ITER project design foresees Supercritical Helium (SHe) forced flow cooling for the main cryogenic components, namely, the superconducting (SC) magnets and cryopumps (CP). Therefore, cold circulators have been selected to provide the required SHe mass flow rate to cope with specific operating conditions and technical requirements. Considering the availability impacts of such machines, it has been decided to perform evaluation tests of the cold circulators at operating conditions prior to the series production in order to minimize the project technical risks. A proposal has been conceptualized, evaluated and simulated to perform representative tests of the full scale SHe coldmore » circulators. The objectives of the performance tests include the validation of normal operating condition, transient and off-design operating modes as well as the efficiency measurement. A suitable process and instrumentation diagram of the test valve box (TVB) has been developed to implement the tests at the required thermodynamic conditions. The conceptual engineering design of the TVB has been developed along with the required thermal analysis for the normal operating conditions to support the performance evaluation of the SHe cold circulator.« less
NASA Technical Reports Server (NTRS)
Baldridge, P. E.; Geosling, P. H.; Leone, F.; Minshall, C.; Rodgers, R. H.; Wilhelm, C. L.
1975-01-01
The programmatic, technical, user application, and cost factors associated with the development of an operational, statewide land use inventory from LANDSAT data are described. The LANDSAT multispectral data are subjected to geometrical and categorical processing to produce map files for each of the 200 fifteen (15) minute quads covering Ohio. Computer compatible tapes are rescanned to produce inventory tapes which identify eight (8) Level I land use categories and a variety of Level II categories. The inventory tapes are processed through a series of ten (10) software programs developed by the State of Ohio. The net result is a computerized inventory which can be displayed in map or tabular form for various geographic units, at a variety of scales and for selected categories of usage. The computerized inventory data files are applied to technical programs developed by the various state agencies to be used in state, regional, and local planning programs.
Gemini Observatory base facility operations: systems engineering process and lessons learned
NASA Astrophysics Data System (ADS)
Serio, Andrew; Cordova, Martin; Arriagada, Gustavo; Adamson, Andy; Close, Madeline; Coulson, Dolores; Nitta, Atsuko; Nunez, Arturo
2016-08-01
Gemini North Observatory successfully began nighttime remote operations from the Hilo Base Facility control room in November 2015. The implementation of the Gemini North Base Facility Operations (BFO) products was a great learning experience for many of our employees, including the author of this paper, the BFO Systems Engineer. In this paper we focus on the tailored Systems Engineering processes used for the project, the various software tools used in project support, and finally discuss the lessons learned from the Gemini North implementation. This experience and the lessons learned will be used both to aid our implementation of the Gemini South BFO in 2016, and in future technical projects at Gemini Observatory.
Recent developments in photocatalytic water treatment technology: a review.
Chong, Meng Nan; Jin, Bo; Chow, Christopher W K; Saint, Chris
2010-05-01
In recent years, semiconductor photocatalytic process has shown a great potential as a low-cost, environmental friendly and sustainable treatment technology to align with the "zero" waste scheme in the water/wastewater industry. The ability of this advanced oxidation technology has been widely demonstrated to remove persistent organic compounds and microorganisms in water. At present, the main technical barriers that impede its commercialisation remained on the post-recovery of the catalyst particles after water treatment. This paper reviews the recent R&D progresses of engineered-photocatalysts, photoreactor systems, and the process optimizations and modellings of the photooxidation processes for water treatment. A number of potential and commercial photocatalytic reactor configurations are discussed, in particular the photocatalytic membrane reactors. The effects of key photoreactor operation parameters and water quality on the photo-process performances in terms of the mineralization and disinfection are assessed. For the first time, we describe how to utilize a multi-variables optimization approach to determine the optimum operation parameters so as to enhance process performance and photooxidation efficiency. Both photomineralization and photo-disinfection kinetics and their modellings associated with the photocatalytic water treatment process are detailed. A brief discussion on the life cycle assessment for retrofitting the photocatalytic technology as an alternative waste treatment process is presented. This paper will deliver a scientific and technical overview and useful information to scientists and engineers who work in this field.
Wave Phase-Sensitive Transformation of 3d-Straining of Mechanical Fields
NASA Astrophysics Data System (ADS)
Smirnov, I. N.; Speranskiy, A. A.
2015-11-01
It is the area of research of oscillatory processes in elastic mechanical systems. Technical result of innovation is creation of spectral set of multidimensional images which reflect time-correlated three-dimensional vector parameters of metrological, and\\or estimated, and\\or design parameters of oscillations in mechanical systems. Reconstructed images of different dimensionality integrated in various combinations depending on their objective function can be used as homeostatic profile or cybernetic image of oscillatory processes in mechanical systems for an objective estimation of current operational conditions in real time. The innovation can be widely used to enhance the efficiency of monitoring and research of oscillation processes in mechanical systems (objects) in construction, mechanical engineering, acoustics, etc. Concept method of vector vibrometry based on application of vector 3D phase- sensitive vibro-transducers permits unique evaluation of real stressed-strained states of power aggregates and loaded constructions and opens fundamental innovation opportunities: conduct of continuous (on-line regime) reliable monitoring of turboagregates of electrical machines, compressor installations, bases, supports, pipe-lines and other objects subjected to damaging effect of vibrations; control of operational safety of technical systems at all the stages of life cycle including design, test production, tuning, testing, operational use, repairs and resource enlargement; creation of vibro-diagnostic systems of authentic non-destructive control of anisotropic characteristics of materials resistance of power aggregates and loaded constructions under outer effects and operational flaws. The described technology is revolutionary, universal and common for all branches of engineering industry and construction building objects.
Gianico, Andrea; Bertanza, Giorgio; Braguglia, Camilla M; Canato, Matteo; Gallipoli, Agata; Laera, Giuseppe; Levantesi, Caterina; Mininni, Giuseppe
2016-05-01
Sewage sludge processing is a key issue in water resource recovery facilities due to the inefficacy of conventional treatments to produce high quality biosolids to be safely used in agriculture. Under this framework, the performances of several enhanced stabilization processes, namely ultrasound-pretreated Mesophilic Anaerobic Digestion (US+MAD), thermophilic anaerobic digestion (TAD), thermal-pretreated TAD (TH+TAD) and ultrasound-pretreated inverse Temperature Phased Anaerobic Digestion (US+iTPAD) have been investigated. Such enhanced processes resulted in higher biogas yields and higher destruction of pathogens with respect to conventional MAD process, thus suggesting their feasibility in full-scale implementation perspectives. A procedure for technical-economic comparison of new sludge processing lines against conventional ones (benchmarking) was developed, based on the definition of technical issues (e.g. reliability, complexity, etc.) which are rated for each situation. Moreover, capital and operating costs were estimated. The enhanced processes analyzed in this work showed some potentially critical items, mainly related to energy balance and reagent consumption.
NASA Astrophysics Data System (ADS)
Abdullaev, Iskandar; Rakhmatullaev, Shavkat
2014-05-01
The paper discusses vulnerability areas of water sector in arid Central Asia due to climate change projections with particular focus on adaptation to sustainable operation of physical infrastructure capacities (from legal, institutional and technical aspects). Two types of technical installations are the main focus of this paper, i.e., electrical lift irrigation systems and water reservoirs. The first set of electrical lift infrastructure is strategic for delivering water to water users via pumps, diversion structures, vertical drainage facilities and groundwater boreholes; on the other hand, the primarily task of second set of structures is to accumulate the water resources for sectors of economy. In Central Asia, approximately, 20-50% of irrigation water is lifted, yet major of lift structures are in very poor technical conditions coupled with ever increasing of electricity tariffs. Furthermore, useful volumes capacities of water reservoirs are being severely diminished due to bio-physical geomorphologic processes, improper operational regimes and chronic financing for special in-house sedimentation surveys. Most importantly, the key argument is that irrigation sector should internalize its adaptation efforts, i.e., integrate renewable energy technologies, energy audit programs and lastly design comprehensive investment prioritization processes and programs. Otherwise, water sector will be at great risk for continued provision of fundamental services to the public, food security and industry
Mars Colony in situ resource utilization: An integrated architecture and economics model
NASA Astrophysics Data System (ADS)
Shishko, Robert; Fradet, René; Do, Sydney; Saydam, Serkan; Tapia-Cortez, Carlos; Dempster, Andrew G.; Coulton, Jeff
2017-09-01
This paper reports on our effort to develop an ensemble of specialized models to explore the commercial potential of mining water/ice on Mars in support of a Mars Colony. This ensemble starts with a formal systems architecting framework to describe a Mars Colony and capture its artifacts' parameters and technical attributes. The resulting database is then linked to a variety of ;downstream; analytic models. In particular, we integrated an extraction process (i.e., ;mining;) model, a simulation of the colony's environmental control and life support infrastructure known as HabNet, and a risk-based economics model. The mining model focuses on the technologies associated with in situ resource extraction, processing, storage and handling, and delivery. This model computes the production rate as a function of the systems' technical parameters and the local Mars environment. HabNet simulates the fundamental sustainability relationships associated with establishing and maintaining the colony's population. The economics model brings together market information, investment and operating costs, along with measures of market uncertainty and Monte Carlo techniques, with the objective of determining the profitability of commercial water/ice in situ mining operations. All told, over 50 market and technical parameters can be varied in order to address ;what-if; questions, including colony location.
Preparing clinical grade Ag-specific T cells for adoptive immunotherapy trials
DiGiusto, DL; Cooper, LJN
2007-01-01
The production of clinical-grade T cells for adoptive immunotherapy has evolved from the ex vivo numerical expansion of tumor-infiltrating lymphocytes to sophisticated bioengineering processes often requiring cell selection, genetic modification and other extensive tissue culture manipulations, to produce desired cells with improved therapeutic potential. Advancements in understanding the biology of lymphocyte signaling, activation, homing and sustained in vivo proliferative potential have redefined the strategies used to produce T cells suitable for clinical investigation. When combined with new technical methods in cell processing and culturing, the therapeutic potential of T cells manufactured in academic centers has improved dramatically. Paralleling these technical achievements in cell manufacturing is the development of broadly applied regulatory standards that define the requirements for the clinical implementation of cell products with ever-increasing complexity. In concert with academic facilities operating in compliance with current good manufacturing practice, the prescribing physician can now infuse T cells with a highly selected or endowed phenotype that has been uniformly manufactured according to standard operating procedures and that meets federal guidelines for quality of investigational cell products. In this review we address salient issues related to the technical, immunologic, practical and regulatory aspects of manufacturing these advanced T-cell products for clinical use. PMID:17943498
The Australian SKA Pathfinder: project update and initial operations
NASA Astrophysics Data System (ADS)
Schinckel, Antony E. T.; Bock, Douglas C.-J.
2016-08-01
The Australian Square Kilometre Array Pathfinder (ASKAP) will be the fastest dedicated cm-wave survey telescope, and will consist of 36 12-meter 3-axis antennas, each with a large chequerboard phased array feed (PAF) receiver operating between 0.7 and 1.8 GHz, and digital beamforming prior to correlation. The large raw data rates involved ( 100 Tb/sec), and the need to do pipeline processing, has led to the antenna incorporating a third axis to fix the parallactic angle with respect to the entire optical system (blockages and phased array feed). It also results in innovative technical solutions to the data transport and processing issues. ASKAP is located at the Murchison Radio-astronomy Observatory (MRO), a new observatory developed for the Square Kilometre Array (SKA), 315 kilometres north-east of Geraldton, Western Australia. The MRO also hosts the SKA low frequency pathfinder instrument, the Murchison Widefield Array and will host the initial low frequency instrument of the SKA, SKA1-Low. Commissioning of ASKAP using six antennas equipped with first-generation PAFs is now complete and installation of second-generation PAFs and digital systems is underway. In this paper we review technical progress and commissioning to date, and refer the reader to relevant technical and scientific publications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Westendorf, Tiffany; Buddle, Stanlee; Caraher, Joel
The objective of this project is to design and build a bench-scale process for a novel phase-changing aminosilicone-based CO 2-capture solvent. The project will establish scalability and technical and economic feasibility of using a phase-changing CO 2-capture absorbent for post-combustion capture of CO 2 from coal-fired power plants. The U.S. Department of Energy’s goal for Transformational Carbon Capture Technologies is the development of technologies available for demonstration by 2025 that can capture 90% of emitted CO 2 with at least 95% CO 2 purity for less than $40/tonne of CO 2 captured. In the first budget period of the project,more » the bench-scale phase-changing CO2 capture process was designed using data and operating experience generated under a previous project (ARPA-e project DE-AR0000084). Sizing and specification of all major unit operations was completed, including detailed process and instrumentation diagrams. The system was designed to operate over a wide range of operating conditions to allow for exploration of the effect of process variables on CO 2 capture performance. In the second budget period of the project, individual bench-scale unit operations were tested to determine the performance of each of each unit. Solids production was demonstrated in dry simulated flue gas across a wide range of absorber operating conditions, with single stage CO 2 conversion rates up to 75mol%. Desorber operation was demonstrated in batch mode, resulting in desorption performance consistent with the equilibrium isotherms for GAP-0/CO 2 reaction. Important risks associated with gas humidity impact on solids consistency and desorber temperature impact on thermal degradation were explored, and adjustments to the bench-scale process were made to address those effects. Corrosion experiments were conducted to support selection of suitable materials of construction for the major unit operations in the process. The bench scale unit operations were assembled into a continuous system to support steady state system testing. In the third budget period of the project, continuous system testing was conducted, including closed-loop operation of the absorber and desober systems. Slurries of GAP-0/GAP-0 carbamate/water mixtures produced in the absorber were pumped successfully to the desorber unit, and regenerated solvent was returned to the absorber. A techno-economic analysis, EH&S risk assessment, and solvent manufacturability study were completed.« less
Preparation of Effective Operating Manuals to Support Waste Management Plant Operator Training
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, S. R.
2003-02-25
Effective plant operating manuals used in a formal training program can make the difference between a successful operation and a failure. Once the plant process design and control strategies have been fixed, equipment has been ordered, and the plant is constructed, the only major variable affecting success is the capability of plant operating personnel. It is essential that the myriad details concerning plant operation are documented in comprehensive operating manuals suitable for training the non-technical personnel that will operate the plant. These manuals must cover the fundamental principles of each unit operation including how each operates, what process variables aremore » important, and the impact of each variable on the overall process. In addition, operators must know the process control strategies, process interlocks, how to respond to alarms, each of the detailed procedures required to start up and optimize the plant, and every control loop-including when it is appropriate to take manual control. More than anything else, operating mistakes during the start-up phase can lead to substantial delays in achieving design processing rates as well as to problems with government authorities if environmental permit limits are exceeded. The only way to assure return on plant investment is to ensure plant operators have the knowledge to properly run the plant from the outset. A comprehensive set of operating manuals specifically targeted toward plant operators and supervisors written by experienced operating personnel is the only effective way to provide the necessary information for formal start-up training.« less
Guidebook for solar process-heat applications
NASA Astrophysics Data System (ADS)
Fazzolare, R.; Mignon, G.; Campoy, L.; Luttmann, F.
1981-01-01
The potential for solar process heat in Arizona and some of the general technical aspects of solar, such as insolation, siting, and process analysis are explored. Major aspects of a solar plant design are presented. Collectors, storage, and heat exchange are discussed. Reducing hardware costs to annual dollar benefits is also discussed. Rate of return, cash flow, and payback are discussed as they relate to solar systems. Design analysis procedures are presented. The design cost optimization techniques using a yearly computer simulation of a solar process operation is demonstrated.
ERIC Educational Resources Information Center
Jou, Min; Wang, Jingying
2015-01-01
This study investigated a Ubiquitous Sensor System (USS) that we developed to assess student thought process during practical lessons on a real-time basis and to provide students with a reflective learning environment. Behavioral curves and data obtained by the USS would help students understand where they had made mistakes during practical…
Operational Plan Ontology Model for Interconnection and Interoperability
NASA Astrophysics Data System (ADS)
Long, F.; Sun, Y. K.; Shi, H. Q.
2017-03-01
Aiming at the assistant decision-making system’s bottleneck of processing the operational plan data and information, this paper starts from the analysis of the problem of traditional expression and the technical advantage of ontology, and then it defines the elements of the operational plan ontology model and determines the basis of construction. Later, it builds up a semi-knowledge-level operational plan ontology model. Finally, it probes into the operational plan expression based on the operational plan ontology model and the usage of the application software. Thus, this paper has the theoretical significance and application value in the improvement of interconnection and interoperability of the operational plan among assistant decision-making systems.
When a plant shuts down: The psychology of decommissioning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schulz, J.; Crawford, A.C.
Within the next decade, 10 to 25 nuclear plants in the United States may be taken off line. Many will have reached the end of their 40-year life cycles, but others will be retired because the cost of operating them has begun to outweigh their economic benefit. Such was the case at Fort St. Vrain, the first decommissioning of a US commercial plant under new Nuclear Regulatory Commission (NRC) regulations. Two major problems associated with decommissioning plants have been obvious: (1) the technical challenges and costs of decommissioning, and (2) the cost of maintaining and finally decommissioning a plant aftermore » a safe storage (SAFSTOR) period of approximately 60 years. What has received little attention is the challenge that affects not only the people who make a plant work, but the quality of the solutions to these problems: how to maintain effective organizational performance during the process of downsizing and decommissioning and/or SAFSTOR. The quality of technical solutions for closing a plant, as well as how successfully the decommissioning process is held within or below budget, will depend largely on how effectively the nuclear organization functions as a social unit. Technical and people issues are bound together. The difficulty is how to operate a plant effectively when plant personnel have no sense of long-term security. As the nuclear power industry matures and the pace for closing operating plants accelerates, the time has come to prepare for the widespread decommissioning of plants. The industry would be well served by conducting a selective, industry-wide evaluation of plants to assess its overall readiness for the decommissioning process. A decommissioning is not likely to be trouble free, but with a healthy appreciation for the human side of the process, it will undoubtedly go more smoothly than if approached as a matter of dismantling a machine.« less
NASA Astrophysics Data System (ADS)
Meyer, K.; Ruiken, J.-P.; Illner, M.; Paul, A.; Müller, D.; Esche, E.; Wozny, G.; Maiwald, M.
2017-03-01
Reaction monitoring in disperse systems, such as emulsions, is of significant technical importance in various disciplines like biotechnological engineering, chemical industry, food science, and a growing number other technical fields. These systems pose several challenges when it comes to process analytics, such as heterogeneity of mixtures, changes in optical behavior, and low optical activity. Concerning this, online nuclear magnetic resonance (NMR) spectroscopy is a powerful technique for process monitoring in complex reaction mixtures due to its unique direct comparison abilities, while at the same time being non-invasive and independent of optical properties of the sample. In this study the applicability of online-spectroscopic methods on the homogeneously catalyzed hydroformylation system of 1-dodecene to tridecanal is investigated, which is operated in a mini-plant scale at Technische Universität Berlin. The design of a laboratory setup for process-like calibration experiments is presented, including a 500 MHz online NMR spectrometer, a benchtop NMR device with 43 MHz proton frequency as well as two Raman probes and a flow cell assembly for an ultraviolet and visible light (UV/VIS) spectrometer. Results of high-resolution online NMR spectroscopy are shown and technical as well as process-specific problems observed during the measurements are discussed.
Care and Handling of Computer Magnetic Storage Media.
ERIC Educational Resources Information Center
Geller, Sidney B.
Intended for use by data processing installation managers, operating personnel, and technical staff, this publication provides a comprehensive set of care and handling guidelines for the physical/chemical preservation of computer magnetic storage media--principally computer magnetic tapes--and their stored data. Emphasis is placed on media…
Carbothermal Production of Magnesium: Csiro's Magsonic™ Process
NASA Astrophysics Data System (ADS)
Prentice, Leon H.; Nagle, Michael W.; Barton, Timothy R. D.; Tassios, Steven; Kuan, Benny T.; Witt, Peter J.; Constanti-Carey, Keri K.
Carbothermal production has been recognized as conceptually the simplest and cleanest route to magnesium metal, but has suffered from technical challenges of development and scale-up. Work by CSIRO has now successfully demonstrated the technology using supersonic quenching of magnesium vapor (the MagSonic™ Process). Key barriers to process development have been overcome: the experimental program has achieved sustained operation, no nozzle blockage, minimal reversion, and safe handling of pyrophoric powders. The laboratory equipment has been operated at industrially relevant magnesium vapor concentrations (>25% Mg) for multiple runs with no blockage. Novel computational fluid dynamics (CFD) modeling of the shock quenching and metal vapor condensation has informed nozzle design and is supported by experimental data. Reversion below 10% has been demonstrated, and magnesium successfully purified (>99.9%) from the collected powder. Safe operating procedures have been developed and demonstrated, minimizing the risk of powder explosion. The MagSonic™ Process is now ready to progress to significantly larger scale and continuous operation.
ELECTRA © Launch and Re-Entry Safety Analysis Tool
NASA Astrophysics Data System (ADS)
Lazare, B.; Arnal, M. H.; Aussilhou, C.; Blazquez, A.; Chemama, F.
2010-09-01
French Space Operation Act gives as prime objective to National Technical Regulations to protect people, properties, public health and environment. In this frame, an independent technical assessment of French space operation is delegated to CNES. To perform this task and also for his owns operations CNES needs efficient state-of-the-art tools for evaluating risks. The development of the ELECTRA© tool, undertaken in 2007, meets the requirement for precise quantification of the risks involved in launching and re-entry of spacecraft. The ELECTRA© project draws on the proven expertise of CNES technical centers in the field of flight analysis and safety, spaceflight dynamics and the design of spacecraft. The ELECTRA© tool was specifically designed to evaluate the risks involved in the re-entry and return to Earth of all or part of a spacecraft. It will also be used for locating and visualizing nominal or accidental re-entry zones while comparing them with suitable geographic data such as population density, urban areas, and shipping lines, among others. The method chosen for ELECTRA© consists of two main steps: calculating the possible reentry trajectories for each fragment after the spacecraft breaks up; calculating the risks while taking into account the energy of the fragments, the population density and protection afforded by buildings. For launch operations and active re-entry, the risk calculation will be weighted by the probability of instantaneous failure of the spacecraft and integrated for the whole trajectory. ELECTRA©’s development is today at the end of the validation phase, last step before delivery to users. Validation process has been performed in different ways: numerical application way for the risk formulation; benchmarking process for casualty area, level of energy of the fragments entries and level of protection housing module; best practices in space transportation industries concerning dependability evaluation; benchmarking process for world population repartition leading to the choice of a worldwide used model called GPW V3. Then, the complementary part for validation has been numerous system tests, most of them by comparison with already existing tools, operationally used for example into the European Space port in French Guyana. The purpose of this article is to review the method and models chosen by CNES for describing physical phenomena and the results of validation process including comparison with other risk assessment tools.
NASA Astrophysics Data System (ADS)
Haslinger, Edith; Goldbrunner, Johann; Dietzel, Martin; Leis, Albrecht; Boch, Ronny; Knauss, Ralf; Hippler, Dorothee; Shirbaz, Andrea; Fröschl, Heinz; Wyhlidal, Stefan; Plank, Otmar; Gold, Marlies; Elster, Daniel
2017-04-01
During the exploitation of thermal water for the use in a geothermal plant a series of hydrochemical reactions such as solution and precipitation processes (scaling) or corrosion processes can be caused by pressure and temperature changes and degassing of the thermal water. Operators of hydrogeothermal plants are often confronted with precipitations in water-bearing parts of their plant, such as heat exchangers and pipes, which result in considerable costs for cleaning or remediation or the use of inhibitors. In the worst case, scaling and corrosion can lead to the abandonment of the system. The effects of the fluids on the technical facilities of hydrogeothermal plants are usually difficult to predict. This applies in particular to the long-term effects in the exploitation and use as well as the aspect of the reinjection of the fluids. In publications and guides for thermal water use in Austria, it is emphasized that the hydrochemical conditions have to be checked during the operation of geothermal plants, but precise directives and thus guidance for operators as well as a scientific investigations on this topic are almost completely missing today. The aim of the research project NoScale was the assessment of deep thermal water bodies in different geological reservoirs in Austria and Bavaria and therefore different hydrochemical compositions with regard to their scaling and corrosion potential in geothermal use. In the course of parallel chemical and mineralogical laboratory investigations, conclusions were drawn about the effects of thermal water on different technical components of hydrogeothermal plants and on the other hand a data basis for the model simulation of the relevant hydrochemical processes was developed. Subsequently, on the basis of detailed hydrochemical model calculations, possible effects of the use of the thermal waters on the technical components of the geothermal plants were shown. This approach of complex process modeling, detailed laboratory studies and experimental approaches has not been followed in Austria so far. The research results contribute significantly to the increased visibility of potential risks of the exploitation and use of thermal water. Thus, the project NoScale supports the operators of hydrogeothermal plants to assess risks of scaling in corrosion already in the pre-drilling phase, which leads to a much more energy and cost efficient operation.
Siu, Joey; Maran, Nikki; Paterson-Brown, Simon
2016-06-01
The importance of non-technical skills in improving surgical safety and performance is now well recognised. Better understanding is needed of the impact that non-technical skills of the multi-disciplinary theatre team have on intra-operative incidents in the operating room (OR) using structured theatre-based assessment. The interaction of non-technical skills that influence surgical safety of the OR team will be explored and made more transparent. Between May-August 2013, a range of procedures in general and vascular surgery in the Royal Infirmary of Edinburgh were performed. Non-technical skills behavioural markers and associated intra-operative incidents were recorded using established behavioural marking systems (NOTSS, ANTS and SPLINTS). Adherence to the surgical safety checklist was also observed. A total of 51 procedures were observed, with 90 recorded incidents - 57 of which were considered avoidable. Poor situational awareness was a common area for surgeons and anaesthetists leading to most intra-operative incidents. Poor communication and teamwork across the whole OR team had a generally large impact on intra-operative incidents. Leadership was shown to be an essential set of skills for the surgeons as demonstrated by the high correlation of poor leadership with intra-operative incidents. Team-working and management skills appeared to be especially important for anaesthetists in the recovery from an intra-operative incident. A significant number of avoidable incidents occur during operative procedures. These can all be linked to failures in non-technical skills. Better training of both individual and team in non-technical skills is needed in order to improve patient safety in the operating room. Copyright © 2014 Royal College of Surgeons of Edinburgh (Scottish charity number SC005317) and Royal College of Surgeons in Ireland. Published by Elsevier Ltd. All rights reserved.
Launch and Landing Effects Ground Operations (LLEGO) Model
NASA Technical Reports Server (NTRS)
2008-01-01
LLEGO is a model for understanding recurring launch and landing operations costs at Kennedy Space Center for human space flight. Launch and landing operations are often referred to as ground processing, or ground operations. Currently, this function is specific to the ground operations for the Space Shuttle Space Transportation System within the Space Shuttle Program. The Constellation system to follow the Space Shuttle consists of the crewed Orion spacecraft atop an Ares I launch vehicle and the uncrewed Ares V cargo launch vehicle. The Constellation flight and ground systems build upon many elements of the existing Shuttle flight and ground hardware, as well as upon existing organizations and processes. In turn, the LLEGO model builds upon past ground operations research, modeling, data, and experience in estimating for future programs. Rather than to simply provide estimates, the LLEGO model s main purpose is to improve expenses by relating complex relationships among functions (ground operations contractor, subcontractors, civil service technical, center management, operations, etc.) to tangible drivers. Drivers include flight system complexity and reliability, as well as operations and supply chain management processes and technology. Together these factors define the operability and potential improvements for any future system, from the most direct to the least direct expenses.
Applied Space Systems Engineering. Chapter 17; Manage Technical Data
NASA Technical Reports Server (NTRS)
Kent, Peter
2008-01-01
Effective space systems engineering (SSE) is conducted in a fully electronic manner. Competitive hardware, software, and system designs are created in a totally digital environment that enables rapid product design and manufacturing cycles, as well as a multitude of techniques such as modeling, simulation, and lean manufacturing that significantly reduce the lifecycle cost of systems. Because the SSE lifecycle depends on the digital environment, managing the enormous volumes of technical data needed to describe, build, deploy, and operate systems is a critical factor in the success of a project. This chapter presents the key aspects of Technical Data Management (TDM) within the SSE process. It is written from the perspective of the System Engineer tasked with establishing the TDM process and infrastructure for a major project. Additional perspectives are reflected from the point of view of the engineers on the project who work within the digital engineering environment established by the TDM toolset and infrastructure, and from the point of view of the contactors who interface via the TDM infrastructure. Table 17.1 lists the TDM process as it relates to SSE.
The report discusses technical and non-technical considerations associated with the development and operation of landfill gas to energy projects. Much of the report is based on interviews and site visits with the major developers and operators of the more than 110 projects in the...
Technical Report Cellulosic Based Black Liquor Gasification and Fuels Plant Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fornetti, Micheal; Freeman, Douglas
2012-10-31
The Cellulosic Based Black Liquor Gasification and Fuels Plant Project was developed to construct a black liquor to Methanol biorefinery in Escanaba, Michigan. The biorefinery was to be co-located at the existing pulp and paper mill, NewPage’s Escanaba Paper Mill and when in full operation would: • Generate renewable energy for Escanaba Paper Mill • Produce Methanol for transportation fuel of further refinement to Dimethyl Ether • Convert black liquor to white liquor for pulping. Black liquor is a byproduct of the pulping process and as such is generated from abundant and renewable lignocellulosic biomass. The biorefinery would serve tomore » validate the thermochemical pathway and economic models for black liquor gasification. It was a project goal to create a compelling new business model for the pulp and paper industry, and support the nation’s goal for increasing renewable fuels production and reducing its dependence on foreign oil. NewPage Corporation planned to replicate this facility at other NewPage Corporation mills after this first demonstration scale plant was operational and had proven technical and economic feasibility. An overview of the process begins with black liquor being generated in a traditional Kraft pulping process. The black liquor would then be gasified to produce synthesis gas, sodium carbonate and hydrogen sulfide. The synthesis gas is then cleaned with hydrogen sulfide and carbon dioxide removed, and fed into a Methanol reactor where the liquid product is made. The hydrogen sulfide is converted into polysulfide for use in the Kraft pulping process. Polysulfide is a known additive to the Kraft process that increases pulp yield. The sodium carbonate salts are converted to caustic soda in a traditional recausticizing process. The caustic soda is then part of the white liquor that is used in the Kraft pulping process. Cellulosic Based Black Liquor Gasification and Fuels Plant project set out to prove that black liquor gasification could produce transportation fuels and produce pulp at the same time. This has the added advantage of reducing or eliminating the need for a recovery boiler. The recovery boiler is an extremely expensive unit operation in the Kraft process and is key to the chemical recovery system that makes the Kraft process successful. Going to a gasification process with potentially higher energy efficiency, improve the pulping process and be more efficient with the use of wood. At the same time a renewable fuel product can be made. Cellulosic Based Black Liquor Gasification and Fuels Plant progressed with the design of the mill as Chemrec continued to work on their pilot plant data gathering. The design information helped to guide the pilot plant and vice versa. In the end, the design details showed that the process was technically feasible. However, at the relatively small size of this plant the specific capital cost was very high and could only be considered if the pulp operation needed to replace the recovery boiler. Some of the reasons for the costs being high are attributed to the many constraints that needed to be addressed in the pulping process. Additionally, the Methanol product did not have a vehicle fuel supply chain to enter into. A different product selection could have eliminated this issue. However, with the selected design, the installation at Escanaba Paper Mill was not economically feasible and the project was not pursued further.« less
Remotely Operating a Fourier Transform Spectrometer for Atmospheric Remote Sensing
NASA Technical Reports Server (NTRS)
Blavier, J.-F.; Toon, G. C.; Sen, B.
2000-01-01
This paper describes how the MkIV instrument was adapted for remote operation from the Barcroft site, where the harsh winter conditions make access difficult. Some of the main technical challenges will be discussed including, (i) operation from solar panels and batteries, (ii) cooling the detectors with LN2, (iii) instrument control and monitoring over a cellular phone, and (iv) data storage, processing and analysis. Finally, MkIV spectra measured from Barcroft and compared with those measured from JPL to highlight the advantages of the higher altitude site.
Quantifying technical skills during open operations using video-based motion analysis.
Glarner, Carly E; Hu, Yue-Yung; Chen, Chia-Hsiung; Radwin, Robert G; Zhao, Qianqian; Craven, Mark W; Wiegmann, Douglas A; Pugh, Carla M; Carty, Matthew J; Greenberg, Caprice C
2014-09-01
Objective quantification of technical operative skills in surgery remains poorly defined, although the delivery of and training in these skills is essential to the profession of surgery. Attempts to measure hand kinematics to quantify operative performance primarily have relied on electromagnetic sensors attached to the surgeon's hand or instrument. We sought to determine whether a similar motion analysis could be performed with a marker-less, video-based review, allowing for a scalable approach to performance evaluation. We recorded six reduction mammoplasty operations-a plastic surgery procedure in which the attending and resident surgeons operate in parallel. Segments representative of surgical tasks were identified with Multimedia Video Task Analysis software. Video digital processing was used to extract and analyze the spatiotemporal characteristics of hand movement. Attending plastic surgeons appear to use their nondominant hand more than residents when cutting with the scalpel, suggesting more use of countertraction. While suturing, attendings were more ambidextrous, with smaller differences in movement between their dominant and nondominant hands than residents. Attendings also seem to have more conservation of movement when performing instrument tying than residents, as demonstrated by less nondominant hand displacement. These observations were consistent within procedures and between the different attending plastic surgeons evaluated in this fashion. Video motion analysis can be used to provide objective measurement of technical skills without the need for sensors or markers. Such data could be valuable in better understanding the acquisition and degradation of operative skills, providing enhanced feedback to shorten the learning curve. Copyright © 2014 Mosby, Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kimmell, T.; Folga, S., Frey, G.; Molberg, J.
2001-05-04
This volume of the Technical Resource Document (TRD) for the ''Environmental Impact Statement (EIS) for the Design, Construction and Operation of One or More Pilot Test Facilities for Assembled Chemical Weapons Destruction Technologies at One or More Sites'' (PMACWA 2001g) pertains to the destruction of assembled chemical weapons (ACW) stored at Anniston Army Depot (ANAD), located outside Anniston, Alabama. This volume presents technical and process information on each of the destruction technologies applicable to treatment of the specific ACW stored at ANAD. The destruction technologies described are those that have been demonstrated as part of the Assembled Chemical Weapons Assessmentmore » (ACWA) selection process (see Volume 1).« less
NASA Astrophysics Data System (ADS)
Starikov, A. I.; Nekrasov, R. Yu; Teploukhov, O. J.; Soloviev, I. V.; Narikov, K. A.
2016-10-01
Manufactures, machinery and equipment improve of constructively as science advances and technology, and requirements are improving of quality and longevity. That is, the requirements for surface quality and precision manufacturing, oil and gas equipment parts are constantly increasing. Production of oil and gas engineering products on modern machine tools with computer numerical control - is a complex synthesis of technical and electrical equipment parts, as well as the processing procedure. Technical machine part wears during operation and in the electrical part are accumulated mathematical errors. Thus, the above-mentioned disadvantages of any of the following parts of metalworking equipment affect the manufacturing process of products in general, and as a result lead to the flaw.
Regenbogen, Scott E; Greenberg, Caprice C; Studdert, David M; Lipsitz, Stuart R; Zinner, Michael J; Gawande, Atul A
2007-11-01
To identify the most prevalent patterns of technical errors in surgery, and evaluate commonly recommended interventions in light of these patterns. The majority of surgical adverse events involve technical errors, but little is known about the nature and causes of these events. We examined characteristics of technical errors and common contributing factors among closed surgical malpractice claims. Surgeon reviewers analyzed 444 randomly sampled surgical malpractice claims from four liability insurers. Among 258 claims in which injuries due to error were detected, 52% (n = 133) involved technical errors. These technical errors were further analyzed with a structured review instrument designed by qualitative content analysis. Forty-nine percent of the technical errors caused permanent disability; an additional 16% resulted in death. Two-thirds (65%) of the technical errors were linked to manual error, 9% to errors in judgment, and 26% to both manual and judgment error. A minority of technical errors involved advanced procedures requiring special training ("index operations"; 16%), surgeons inexperienced with the task (14%), or poorly supervised residents (9%). The majority involved experienced surgeons (73%), and occurred in routine, rather than index, operations (84%). Patient-related complexities-including emergencies, difficult or unexpected anatomy, and previous surgery-contributed to 61% of technical errors, and technology or systems failures contributed to 21%. Most technical errors occur in routine operations with experienced surgeons, under conditions of increased patient complexity or systems failure. Commonly recommended interventions, including restricting high-complexity operations to experienced surgeons, additional training for inexperienced surgeons, and stricter supervision of trainees, are likely to address only a minority of technical errors. Surgical safety research should instead focus on improving decision-making and performance in routine operations for complex patients and circumstances.
Amelioration and retrofitting of educational buildings
NASA Astrophysics Data System (ADS)
Casciati, Fabio; Casciati, Sara
2018-01-01
Following a seismic event that occurred years ago in Central Italy, the public opinion was growing and growing a concern on the adequacy of educational buildings all across Italy. This activated several political decisions and a consequent technical effort is in progress. Technically speaking one has to manage the classical problem of retrofitting existing buildings. However, the legal environment goes across national codes, targeted guidelines and the professional need of achieving pragmatic solutions based on ethical and social acceptation schemes.This paper introduces the topic in its worldwide exception and focuses then on some operative aspects in the Italian situation. It outlines the consolidated steps along this technical process and emphasizes the weak aspects one meets when going across the designers' reports.
Arianespace Launch Service Operator Policy for Space Safety (Regulations and Standards for Safety)
NASA Astrophysics Data System (ADS)
Jourdainne, Laurent
2013-09-01
Since December 10, 2010, the French Space Act has entered into force. This French Law, referenced as LOS N°2008-518 ("Loi relative aux Opérations Spatiales"), is compliant with international rules. This French Space Act (LOS) is now applicable for any French private company whose business is dealing with rocket launch or in orbit satellites operations. Under CNES leadership, Arianespace contributed to the consolidation of technical regulation applicable to launch service operators.Now for each launch operation, the operator Arianespace has to apply for an authorization to proceed to the French ministry in charge of space activities. In the files issued for this purpose, the operator is able to justify a high level of warranties in the management of risks through robust processes in relation with the qualification maintenance, the configuration management, the treatment of technical facts and relevant conclusions and risks reduction implementation when needed.Thanks to the historic success of Ariane launch systems through its more than 30 years of exploitation experience (54 successes in a row for latest Ariane 5 launches), Arianespace as well as European public and industrial partners developed key experiences and knowledge as well as competences in space security and safety. Soyuz-ST and Vega launch systems are now in operation from Guiana Space Center with identical and proved risks management processes. Already existing processes have been slightly adapted to cope with the new roles and responsibilities of each actor contributing to the launch preparation and additional requirements like potential collision avoidance with inhabited space objects.Up to now, more than 12 Ariane 5 launches and 4 Soyuz-ST launches have been authorized under the French Space Act regulations. Ariane 5 and Soyuz- ST generic demonstration of conformity have been issued, including exhaustive danger and impact studies for each launch system.This article will detail how Arianespace succeeded to contribute to the maturation of the LOS. How Arianespace managed to demonstrate t he full compliance to the technical regulation for the two launch systems under exploitation (Ariane 5 andSoyuz-ST). Up to now, Vega launch system organization is still in an intermediate transition phase between development and exploitation prior to its second flight. Vega launch system will benefit of Arianespace experience capitalized through Ariane and Soyuz."Safet y is not an option". For our company regarding the mid and long term interest of space business of the launch operations and associated customers, it is a must!
Nepveux, Kevin; Sherlock, Jon-Paul; Futran, Mauricio; Thien, Michael; Krumme, Markus
2015-03-01
Continuous manufacturing (CM) is a process technology that has been used in the chemical industry for large-scale mass production of chemicals in single-purpose plants with benefit for many years. Recent interest has been raised to expand CM into the low-volume, high-value pharmaceutical business with its unique requirements regarding readiness for human use and the required quality, supply chain, and liability constraints in this business context. Using a fairly abstract set of definitions, this paper derives technical consequences of CM in different scenarios along the development-launch-supply axis in different business models and how they compare to batch processes. Impact of CM on functions in development is discussed and several operational models suitable for originators and other business models are discussed and specific aspects of CM are deduced from CM's technical characteristics. Organizational structures of current operations typically can support CM implementations with just minor refinements if the CM technology is limited to single steps or small sequences (bin-to-bin approach) and if the appropriate technical skill set is available. In such cases, a small, dedicated group focused on CM is recommended. The manufacturing strategy, as centralized versus decentralized in light of CM processes, is discussed and the potential impact of significantly shortened supply lead times on the organization that runs these processes. The ultimate CM implementation may be seen by some as a totally integrated monolithic plant, one that unifies chemistry and pharmaceutical operations into one plant. The organization supporting this approach will have to reflect this change in scope and responsibility. The other extreme, admittedly futuristic at this point, would be a highly decentralized approach with multiple smaller hubs; this would require a new and different organizational structure. This processing approach would open up new opportunities for products that, because of stability constraints or individualization to patients, do not allow centralized manufacturing approaches at all. Again, the entire enterprise needs to be restructured accordingly. The situation of CM in an outsourced operation business model is discussed. Next steps for the industry are recommended. In summary, opportunistic implementation of isolated steps in existing portfolios can be implemented with minimal organizational changes; the availability of the appropriate skills is the determining factor. The implementation of more substantial sequences requires business processes that consider the portfolio, not just single products. Exploration and implementation of complete process chains with consequences for quality decisions do require appropriate organizational support. © 2015 Wiley Periodicals, Inc. and the American Pharmacists Association.
Optimization of controlled processes in combined-cycle plant (new developments and researches)
NASA Astrophysics Data System (ADS)
Tverskoy, Yu S.; Muravev, I. K.
2017-11-01
All modern complex technical systems, including power units of TPP and nuclear power plants, work in the system-forming structure of multifunctional APCS. The development of the modern APCS mathematical support allows bringing the automation degree to the solution of complex optimization problems of equipment heat-mass-exchange processes in real time. The difficulty of efficient management of a binary power unit is related to the need to solve jointly at least three problems. The first problem is related to the physical issues of combined-cycle technologies. The second problem is determined by the criticality of the CCGT operation to changes in the regime and climatic factors. The third problem is related to a precise description of a vector of controlled coordinates of a complex technological object. To obtain a joint solution of this complex of interconnected problems, the methodology of generalized thermodynamic analysis, methods of the theory of automatic control and mathematical modeling are used. In the present report, results of new developments and studies are shown. These results allow improving the principles of process control and the automatic control systems structural synthesis of power units with combined-cycle plants that provide attainable technical and economic efficiency and operational reliability of equipment.
Bench-Scale Process for Low-Cost Carbon Dioxide (CO2) Capture Using a Phase-Changing Absorbent
DOE Office of Scientific and Technical Information (OSTI.GOV)
Westendorf, Tiffany; Caraher, Joel; Chen, Wei
2015-03-31
The objective of this project is to design and build a bench-scale process for a novel phase-changing aminosilicone-based CO2-capture solvent. The project will establish scalability and technical and economic feasibility of using a phase-changing CO2-capture absorbent for post-combustion capture of CO2 from coal-fired power plants with 90% capture efficiency and 95% CO2 purity at a cost of $40/tonne of CO2 captured by 2025 and a cost of <$10/tonne of CO2 captured by 2035. In the first budget period of this project, the bench-scale phase-changing CO2 capture process was designed using data and operating experience generated under a previous project (ARPA-emore » project DE-AR0000084). Sizing and specification of all major unit operations was completed, including detailed process and instrumentation diagrams. The system was designed to operate over a wide range of operating conditions to allow for exploration of the effect of process variables on CO2 capture performance.« less
The standards process: Technical committee X3B5 digital magnetic tape
NASA Technical Reports Server (NTRS)
Cheatham, Sam
1993-01-01
The definition of X3B5, where it fits in the national and international standards development process, and how it interfaces and influences the world community of standards developers are provided. Details concerning the focus of the committee, how it operates, and what the group sees as the future trends in the area of interchange standards utilizing the multifaceted, ubiquitous magnetic tape are presented.
Sousa, M R; Oliveira, C J S; Lopes, A C; Rodríguez, E R; Holanda, G B M; Landim, P G C; Firmino, P I M; Dos Santos, A B
2016-12-01
We studied the feasibility of the microaerobic process, in comparison with the traditional chemical absorption process (NaOH), on H 2 S removal in order to improve the biogas quality. The experiment consisted of two systems: R1, biogas from an anaerobic reactor was washed in a NaOH solution, and R2, headspace microaeration with atmospheric air in a former anaerobic reactor. The microaeration used for low sulfate concentration wastewater did not affect the anaerobic digestion, but even increased system stability. Methane production in the R2 was 14 % lower compared to R1, due to biogas dilution by the atmospheric air used. The presence of oxygen in the biogas reveals that not all the oxygen was consumed for sulfide oxidation in the liquid phase indicating mass transfer limitations. The reactor was able to rapidly recover its capacity on H 2 S removal after an operational failure. Bacterial and archaeal richness shifted due to changes in operational parameters, which match with the system functioning. Finally, the microaerobic system seems to be more advantageous for both technical and economical reasons, in which the payback of microaerobic process for H 2 S removal was 4.7 months.
Sustainable hydropower in Lower Mekong Countries: Technical assessment and training travel report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hadjerioua, Boualem; Witt, Adam M.
The U.S. Agency for International Development (USAID), through their partnership with the U.S. Department of the Interior (DOI), requested the support of Oak Ridge National Laboratory (ORNL) to provide specialized technical assistance as part of the Smart Infrastructure for the Mekong (SIM) Program in Thailand. Introduced in July 2013 by U.S. Secretary of State John Kerry, SIM is a U.S. Government Inter-Agency program that provides Lower Mekong partner countries with targeted, demand-driven technical and scientific assistance to support environmentally sound, climate conscious and socially equitable infrastructure, clean energy development, and water resources optimization. The U.S. Government is committed to supportingmore » sustainable economic development within the region by providing tools, best practices, technical assistance, and lessons learned for the benefit of partner countries. In response to a request from the Electricity Generating Authority of Thailand (EGAT), a SIM project was developed with two main activities: 1) to promote hydropower sustainability and efficiency through technical assessment training at two existing hydropower assets in Thailand, and 2) the design and implementation of one national and two or three regional science and policy workshops, to be co-hosted with EGAT, to build common understanding of and commitment to environmental and social safeguards for Mekong Basin hydropower projects. The U.S. Department of Energy (DOE) is leading the technical assessment (Activity 1), and has contracted ORNL to provide expert technical assistance focused on increasing efficiency at existing projects, with the goal of increasing renewable energy generation at little to no capital cost. ORNL is the leading national laboratory in hydropower analysis, with a nationally recognized and highly qualified team of scientists addressing small to large-scale systems (basin-, regional-, and national-scale) energy generation optimization analysis for DOE. The mission of the ORNL Water Power Program is to develop technologies, decision-support tools, and methods of analysis that enable holistic management of water-dependent energy infrastructure and natural resources in support of the DOE Energy Efficiency and Renewable Energy Office (DOE-EERE), Federal hydropower agencies, Federal Energy Regulatory Commission (FERC), Nuclear Regulatory Commission (NRC), energy producers, and other entities. In support of SIM, ORNL completed technical assessments of two hydropower plants owned and operated by the Electricity Generating Authority of Thailand (EGAT): Vajiralongkorn (VRK), with an installed capacity of 300 MW, and Rajjaprabha (RPB), with an installed capacity of 240MW. Technical assessment is defined as the assessment of hydropower operation and performance, and the identification of potential opportunities for performance improvement through plant optimization. At each plant, the assessment included an initial analysis of hydropower operating and performance metrics, provided by dam owners. After this analysis, ORNL engaged with the plant management team in a skills exchange, where best practices, operational methods, and technical challenges were discussed. The technical assessment process was outlined to plant management followed by a presentation of preliminary results and analysis based on 50 days of operational data. EGAT has agreed to provide a full year of operational data so a complete and detailed assessment that captures seasonal variability can be completed. The results of these assessments and discussions will be used to develop a set of best practices, training, and procedure recommendations to improve the efficiency of the two assessed plants« less
Resch, C; Grasmug, M; Smeets, W; Braun, R; Kirchmayr, R
2006-01-01
Anaerobic co-digestion of organic wastes from households, slaughterhouses and meat processing industries was optimised in a half technical scale plant. The plant was operated for 130 days using two different substrates under organic loading rates of 10 and 12 kgCOD.m(-3).d(-1). Since the substrates were rich in fat and protein components (TKN: 12 g.kg(-1) the treatment was challenging. The process was monitored on-line and in the laboratory. It was demonstrated that an intensive and stable co-digestion of partly hydrolysed organic waste and protein rich slaughterhouse waste can be achieved in the balance of inconsistent pH and buffering NH4-N. In the first experimental period the reduction of the substrate COD was almost complete in an overall stable process (COD reduction >82%). In the second period methane productivity increased, but certain intermediate products accumulated constantly. Process design options for a second digestion phase for advanced degradation were investigated. Potential causes for slow and reduced propionic and valeric acid degradation were assessed. Recommendations for full-scale process implementation can be made from the experimental results reported. The highly loaded and stable codigestion of these substrates may be a good technical and economic treatment alternative.
Research on the EDM Technology for Micro-holes at Complex Spatial Locations
NASA Astrophysics Data System (ADS)
Y Liu, J.; Guo, J. M.; Sun, D. J.; Cai, Y. H.; Ding, L. T.; Jiang, H.
2017-12-01
For the demands on machining micro-holes at complex spatial location, several key technical problems are conquered such as micro-Electron Discharge Machining (micro-EDM) power supply system’s development, the host structure’s design and machining process technical. Through developing low-voltage power supply circuit, high-voltage circuit, micro and precision machining circuit and clearance detection system, the narrow pulse and high frequency six-axis EDM machining power supply system is developed to meet the demands on micro-hole discharging machining. With the method of combining the CAD structure design, CAE simulation analysis, modal test, ODS (Operational Deflection Shapes) test and theoretical analysis, the host construction and key axes of the machine tool are optimized to meet the position demands of the micro-holes. Through developing the special deionized water filtration system to make sure that the machining process is stable enough. To verify the machining equipment and processing technical developed in this paper through developing the micro-hole’s processing flow and test on the real machine tool. As shown in the final test results: the efficient micro-EDM machining pulse power supply system, machine tool host system, deionized filtration system and processing method developed in this paper meet the demands on machining micro-holes at complex spatial locations.
Miyasaka, Kiyoyuki W; Buchholz, Joseph; LaMarra, Denise; Karakousis, Giorgos C; Aggarwal, Rajesh
2015-01-01
Introduction Contemporary demands on resident education call for integration of simulation. We designed and implemented a simulation-based curriculum for PGY1 surgery residents to teach technical and non-technical skills within a clinical pathway approach for a foregut surgical patient, from outpatient visit through surgery and post-op follow-up. Methods The three-day curriculum for groups of six residents comprises a combination of standardized patient (SP) encounters, didactic sessions, and hands-on training. The curriculum is underpinned by a summative simulation “pathway” repeated on days 1 and 3. The “pathway” is a series of simulated pre-op, intra-op, and post-op encounters following a single patient through a disease process. The resident sees an SP in clinic presenting with distal gastric cancer, then enters an operating room to perform a gastro-jejunostomy on a porcine tissue model. Finally, the resident engages in a simulated post-operative visit. All encounters are rated by faculty members and the residents themselves, using standardized assessment forms endorsed by the American Board of Surgery. Results 18 first-year residents underwent this curriculum. Faculty ratings of overall operative performance significantly improved following the three-day module. Ratings of preoperative and postoperative performance were not significantly changed in three days. Resident self-ratings significantly improved for all encounters assessed, as did reported confidence in meeting defined learning objectives. Conclusions Conventional surgical simulation training focuses on technical skills in isolation. Our novel “pathway” curriculum targets an important gap in training methodologies by placing both technical and non-technical skills in their clinical context as part of managing a surgical patient. Results indicate consistent improvements in assessments of performance as well as confidence and support its continued usage to educate surgery residents in foregut surgery. PMID:25869238
NASA Technical Reports Server (NTRS)
VanHeukelem, Laurie; Thomas, Crystal S.; Gilbert, Patricia M.; Fargion, Giulietta S. (Editor); McClain, Charles R. (Editor)
2002-01-01
The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project. This particular document focus on the variability in chlorophyll pigment measurements resulting from differences in methodologies and laboratories conducting the pigment analysis.
An experimental investigation of the effects of alarm processing and display on operator performance
DOE Office of Scientific and Technical Information (OSTI.GOV)
O`Hara, J.; Brown, W.; Hallbert, B.
1998-03-01
This paper describes a research program sponsored by the US Nuclear Regulatory Commission to address the human factors engineering (HFE) aspects of nuclear power plant alarm systems. The overall objective of the program is to develop HFE review guidance for advanced alarm systems. As part of this program, guidance has been developed based on a broad base of technical and research literature. In the course of guidance development, aspects of alarm system design for which the technical basis was insufficient to support complete guidance development were identified. The primary purpose of the research reported in this paper was to evaluatemore » the effects of three of these alarm system design characteristics on operator performance in order to contribute to the understanding of potential safety issues and to provide data to support the development of design review guidance in these areas. Three alarm system design characteristics studied were (1) alarm processing (degree of alarm reduction), (2) alarm availability (dynamic prioritization and suppression), and (3) alarm display (a dedicated tile format, a mixed tile and message list format, and a format in which alarm information is integrated into the process displays). A secondary purpose was to provide confirmatory evidence of selected alarm system guidance developed in an earlier phase of the project. The alarm characteristics were combined into eight separate experimental conditions. Six, two-person crews of professional nuclear power plant operators participated in the study. Following training, each crew completed 16 test trials which consisted of two trials in each of the eight experimental conditions (one with a low-complexity scenario and one with a high-complexity scenario). Measures of process performance, operator task performance, situation awareness, and workload were obtained. In addition, operator opinions and evaluations of the alarm processing and display conditions were collected. No deficient performance was observed in any of the experimental conditions, providing confirmatory support for many design review guidelines. The operators identified numerous strengths and weaknesses associated with individual alarm design characteristics.« less
Hise, Adam M; Characklis, Gregory W; Kern, Jordan; Gerlach, Robin; Viamajala, Sridhar; Gardner, Robert D; Vadlamani, Agasteswar
2016-11-01
Algal biofuels are becoming more economically competitive due to technological advances and government subsidies offering tax benefits and lower cost financing. These factors are linked, however, as the value of technical advances is affected by modeling assumptions regarding the growth conditions, process design, and financing of the production facility into which novel techniques are incorporated. Two such techniques, related to algal growth and dewatering, are evaluated in representative operating and financing scenarios using an integrated techno-economic model. Results suggest that these techniques can be valuable under specified conditions, but also that investment subsidies influence cost competitive facility design by incentivizing development of more capital intensive facilities (e.g., favoring hydrothermal liquefaction over transesterification-based facilities). Evaluating novel techniques under a variety of operational and financial scenarios highlights the set of site-specific conditions in which technical advances are most valuable, while also demonstrating the influence of subsidies linked to capital intensity. Copyright © 2016 Elsevier Ltd. All rights reserved.
Space shuttle main engine: Interactive design challenges
NASA Technical Reports Server (NTRS)
Mccarty, J. P.; Wood, B. K.
1985-01-01
The operating requirements established by NASA for the SSME were considerably more demanding than those for earlier rocket engines used in the military launch vehicles or Apollo program. The SSME, in order to achieve the high performance, low weight, long life, reusable objectives, embodied technical demands far in excess of its predecessor rocket engines. The requirements dictated the use of high combustion pressure and the staged combustion cycle which maximizes performance through total use of all propellants in the main combustion process. This approach presented a myriad of technical challenges for maximization of performance within attainable state of the art capabilities for operating pressures, operating temperatures and rotating machinery efficiencies. Controlling uniformity of the high pressure turbomachinery turbine temperature environment was a key challenge for thrust level and life capability demanding innovative engineering. New approaches in the design of the components were necessary to accommodate the multiple use, minimum maintenance objectives. Included were the use of line replaceable units to facilitate field maintenance automatic checkout and internal inspection capabilities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davis, B.E.; Ahner, P.F.; Singelton, A.H.
In situ gasification of steeply dipping coal beds (UCG-SDB) has significant advantages over the more conventional horizontal UCG. In fact, the UCG-SDB process appears to be both technically and operationally competitive with surface gasifiers. The results of the Rawlins UCG-SDB field test program suggest that the process can compete with more conventional sources of synthesis gas on an economic basis. The SDB process mechanism has several advantages over the horizontal process and performs in a fashion similar to surface packedbed reactors. The oxygen requirements for the process are quite low and the degree of process control observed at Rawlins ismore » very attractive.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davis, B.E.; Ahner, P.F.
In-situ gasification of steeply dipping coal beds (UCG-SDB) has significant advantages over the more conventional horizontal UCG. In fact, the UCG-SDB process appears to be both technically and operationally competitive with surface gasifiers. The results of the Rawlins UCG-SDB field test program suggest that the process can compete with more conventional sources of synthesis gas on an economic basis. The SDB process mechanism has several advantages over the horizontal process and performs in a fashion similar to surface packed bed reactors. The oxygen requirements for the process are quite low and the degree of process control observed at Rawlins ismore » very attractive.« less
Identification of granite varieties from colour spectrum data.
Araújo, María; Martínez, Javier; Ordóñez, Celestino; Vilán, José Antonio
2010-01-01
The granite processing sector of the northwest of Spain handles many varieties of granite with specific technical and aesthetic properties that command different prices in the natural stone market. Hence, correct granite identification and classification from the outset of processing to the end-product stage optimizes the management and control of stocks of granite slabs and tiles and facilitates the operation of traceability systems. We describe a methodology for automatically identifying granite varieties by processing spectral information captured by a spectrophotometer at various stages of processing using functional machine learning techniques.
Identification of Granite Varieties from Colour Spectrum Data
Araújo, María; Martínez, Javier; Ordóñez, Celestino; Vilán, José Antonio
2010-01-01
The granite processing sector of the northwest of Spain handles many varieties of granite with specific technical and aesthetic properties that command different prices in the natural stone market. Hence, correct granite identification and classification from the outset of processing to the end-product stage optimizes the management and control of stocks of granite slabs and tiles and facilitates the operation of traceability systems. We describe a methodology for automatically identifying granite varieties by processing spectral information captured by a spectrophotometer at various stages of processing using functional machine learning techniques. PMID:22163673
NASA Technical Reports Server (NTRS)
Prater, T. J.; Werkheiser, N. J.; Ledbetter, F. E., III
2018-01-01
In-space manufacturing seeks to develop the processes, skill sets, and certification architecture needed to provide a rapid response manufacturing capability on long-duration exploration missions. The first 3D printer on the Space Station was developed by Made in Space, Inc. and completed two rounds of operation on orbit as part of the 3D Printing in Zero-G Technology Demonstration Mission. This Technical Publication provides a comprehensive overview of the technical objections of the mission, the two phases of hardware operation conducted on orbit, and the subsequent detailed analysis of specimens produced. No engineering significant evidence of microgravity effects on material outcomes was noted. This technology demonstration mission represents the first step in developing a suite of manufacturing capabilities to meet future mission needs.
Fitness for duty in the nuclear power industry
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durbin, N.; Moore, C.; Grant, T.
1991-09-01
This report presents an overview of the NRC licensees' implementation of the FFD program during the first full year of the program's operation and provides new information on a variety of FFD technical issues. The purpose of this document is to contribute to appropriate changes to the rule, to the inspection process, and to other NRC activities. It describes the characteristics of licensee programs, discusses the results of NRC inspections, updates technical information covered in previous reports, and identifies lessons learned during the first year. Overall, the experience of the first full year of licensees' FFD program operations indicates thatmore » licensees have functioning fitness for duty programs devoted to the NRC rule's performance objectives of achieving drug-free workplaces in which nuclear power plant personnel are not impaired as they perform their duties. 96 refs., 14 tabs.« less
The oil pressure test of the hydraulic impeller blade
NASA Astrophysics Data System (ADS)
Ye, Wen-bo; Jia, Li-tao
2017-12-01
This article introduced the structure of the Kaplan runner in hydropower station and the operating process of the oil pressure test has been described. What’s more, the whole process, including filling oil to the runner hub, the movement of the runner blade, the oil circuit, have been presented in detail.Since the manipulation of the oil circuit which controlled by three Valve groups consisting of six valves was complicated, the author is planning to replace them with 3-position 3-way electromagnetic valves, so we can simplify the operation procedure.The author hopes this article can provide technical reference for the oil pressure test.
Distributed architecture and distributed processing mode in urban sewage treatment
NASA Astrophysics Data System (ADS)
Zhou, Ruipeng; Yang, Yuanming
2017-05-01
Decentralized rural sewage treatment facility over the broad area, a larger operation and management difficult, based on the analysis of rural sewage treatment model based on the response to these challenges, we describe the principle, structure and function in networking technology and network communications technology as the core of distributed remote monitoring system, through the application of case analysis to explore remote monitoring system features in a decentralized rural sewage treatment facilities in the daily operation and management. Practice shows that the remote monitoring system to provide technical support for the long-term operation and effective supervision of the facilities, and reduced operating, maintenance and supervision costs for development.
Code of Federal Regulations, 2014 CFR
2014-01-01
... the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation Operations § 610.2 Scope. (a) Conservation operations, including technical assistance, is the basic soil and water conservation program of...
Code of Federal Regulations, 2012 CFR
2012-01-01
... the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation Operations § 610.2 Scope. (a) Conservation operations, including technical assistance, is the basic soil and water conservation program of...
Code of Federal Regulations, 2013 CFR
2013-01-01
... the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation Operations § 610.2 Scope. (a) Conservation operations, including technical assistance, is the basic soil and water conservation program of...
Code of Federal Regulations, 2011 CFR
2011-01-01
... the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation Operations § 610.2 Scope. (a) Conservation operations, including technical assistance, is the basic soil and water conservation program of...
Project Interface Requirements Process Including Shuttle Lessons Learned
NASA Technical Reports Server (NTRS)
Bauch, Garland T.
2010-01-01
Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings
Introduction to Message-Bus Architectures for Space Systems
NASA Technical Reports Server (NTRS)
Smith, Dan; Gregory, Brian
2005-01-01
This course presents technical and programmatic information on the development of message-based architectures for space mission ground and flight software systems. Message-based architecture approaches provide many significant advantages over the more traditional socket-based one-of-a-kind integrated system development approaches. The course provides an overview of publish/subscribe concepts, the use of common isolation layer API's, approaches to message standardization, and other technical topics. Several examples of currently operational systems are discussed and possible changes to the system development process are presented. Benefits and lessons learned will be discussed and time for questions and answers will be provided.
76 FR 69612 - Amendment to the International Traffic in Arms Regulations: Sudan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-09
... related technical training and assistance to monitoring, verification, or peace support operations... uses, and related technical training and assistance; (3) personal protective gear for the personal use... technical training and assistance to monitoring, verification, or peace support operations, including those...
47 CFR 15.517 - Technical requirements for indoor UWB systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for indoor UWB systems. 15.517 Section 15.517 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.517 Technical requirements for indoor UWB systems. (a) Operation...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
75 FR 12740 - Wyoming Interstate Company, Inc.; Notice of Technical Conference
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-17
... additional technical, engineering, and operational support for its proposed gas quality allocation procedures... should be prepared to support its position with adequate technical, engineering, and operational information. FERC conferences are accessible under section 508 of the Rehabilitation Act of 1973. For...
Software for Managing the Process of Manpower Training for Economic and Industrial Development.
ERIC Educational Resources Information Center
Catoline, James E.
This document discusses the training capabilities, software, and related products of GTE Sylvania Training Operations (STO). With the rapid emergence and development of the Third World, the technical knowhow of large manufacturing industries has become a marketable commodity in the international transfer of technology. Manpower training and human…
Superconducting RF R&D | Technical Division
Doping Contact: Anna Grassellino annag High quality factors (Q) are extremely important to accelerators with high duty factor, due to the infrastructure and operating costs of the cryogenic plant. In 2012, a process was discovered at FNAL to achieve unprecedented Q values by treating them in a high temperature
Some Ideas on the Microcomputer and the Information/Knowledge Workstation.
ERIC Educational Resources Information Center
Boon, J. A.; Pienaar, H.
1989-01-01
Identifies the optimal goal of knowledge workstations as the harmony of technology and human decision-making behaviors. Two types of decision-making processes are described and the application of each type to experimental and/or operational situations is discussed. Suggestions for technical solutions to machine-user interfaces are then offered.…
ERIC Educational Resources Information Center
Hull, Daniel M.
A study was conducted to assist two-year postsecondary educational institutions in providing technical specialty courses for preparing nuclear technicians. As a result of project activities, curricula have been developed for five categories of nuclear technicians and operators: (1) radiation protection technician, (2) nuclear instrumentation and…
Unities in Inductive Reasoning. Technical Report No. 18.
ERIC Educational Resources Information Center
Sternberg, Robert J.; Gardner, Michael K.
Two experiments were performed to study inductive reasoning as a set of thought processes that operates on the structure, as opposed to the content, of organized memory. The content of the reasoning consisted of inductions concerning the names of mammals, assumed to occupy a Euclidean space of three dimensions (size, ferocity, and humanness) in…
Outsourcing Cataloging, Authority Work, and Physical Processing: A Checklist of Considerations.
ERIC Educational Resources Information Center
Kascus, Marie A., Ed.; Hale, Dawn, Ed.
Due to automation technology, financial restrictions, and resultant downsizing, library managers have increasingly relied on the services of contractors, rather than in-house staff, to accomplish different technical services operations. Contracted services may range from a small project for a selected group of materials to a large project for…
Feasibility of mining lunar resources for earth use: Circa 2000 AD. Volume 2: Technical discussion
NASA Technical Reports Server (NTRS)
Nishioka, K.; Arno, R. D.; Alexander, A. D.; Slye, R. E.
1973-01-01
The technologies and systems required to establish the mining base, mine, refine, and return lunar resources to earth are discussed. Gross equipment requirements, their weights and costs are estimated and documented. The operational requirements are analyzed and tabulated. Diagrams of equipment and processing facilities are provided.
ERIC Educational Resources Information Center
Klopping, Paul H.
This lesson introduces the basics of sludge incineration and focuses on the multiple hearth furnace in accomplishing this task. Attention is given to component identification and function process control fundamentals, theory of incineration, safety, and other responsibilites of furnace operation. The material is rather technical and assumes an…
NASA System Engineering Design Process
NASA Technical Reports Server (NTRS)
Roman, Jose
2011-01-01
This slide presentation reviews NASA's use of systems engineering for the complete life cycle of a project. Systems engineering is a methodical, disciplined approach for the design, realization, technical management, operations, and retirement of a system. Each phase of a NASA project is terminated with a Key decision point (KDP), which is supported by major reviews.
A Socio-Technical Analysis of Knowledgeable Practice in Radiation Therapy
ERIC Educational Resources Information Center
Lozano, Reynaldo Garza
2012-01-01
The role of the modern radiation therapist is directed and driven by the organizational system. Changes affecting their role are implemented as a response to changes in the industry. Operations of the modern cancer center, with new and changing treatment technologies bring questions regarding the learning process of radiation therapists at a time…
Coelho, Thereza Christina Bahia; Paim, Jairnilson Silva
2005-01-01
This case study is based on research performed by the Bahia State Health Secretariat (SESAB), aimed at analyzing management practices during the implementation of a State government administrative reform. The institutional agenda shows evidence of limited participation by civil society and technical and operational staff in problem selection and prioritization, resulting from a work process pressured by high-level executive government staff. Decisions regarding "output" (projects, services, and activities) were made under the responsibility of subordinate operational levels and did not appear as issues in the institutional routine. Concerns related to "input" (financial and human resources) consumed most of the high-level efforts, with internal and external negotiations and compromises to assure access to them. Meanwhile the possible "outcome", namely public health status, represents the "occult subject" of the institutional discourse. Information emerges in institutional disputes as a technical "power resource" in its medical, epidemiological, health, and administrative dimensions. The issue of government "representation" and allied interests is based on ideological dispositions and authoritarian practices, thus contradicting the need for management transparency and modernization.
Force-Mediating Magnetic Nanoparticles to Engineer Neuronal Cell Function
Gahl, Trevor J.; Kunze, Anja
2018-01-01
Cellular processes like membrane deformation, cell migration, and transport of organelles are sensitive to mechanical forces. Technically, these cellular processes can be manipulated through operating forces at a spatial precision in the range of nanometers up to a few micrometers through chaperoning force-mediating nanoparticles in electrical, magnetic, or optical field gradients. But which force-mediating tool is more suitable to manipulate cell migration, and which, to manipulate cell signaling? We review here the differences in forces sensation to control and engineer cellular processes inside and outside the cell, with a special focus on neuronal cells. In addition, we discuss technical details and limitations of different force-mediating approaches and highlight recent advancements of nanomagnetics in cell organization, communication, signaling, and intracellular trafficking. Finally, we give suggestions about how force-mediating nanoparticles can be used to our advantage in next-generation neurotherapeutic devices. PMID:29867315
Force-Mediating Magnetic Nanoparticles to Engineer Neuronal Cell Function.
Gahl, Trevor J; Kunze, Anja
2018-01-01
Cellular processes like membrane deformation, cell migration, and transport of organelles are sensitive to mechanical forces. Technically, these cellular processes can be manipulated through operating forces at a spatial precision in the range of nanometers up to a few micrometers through chaperoning force-mediating nanoparticles in electrical, magnetic, or optical field gradients. But which force-mediating tool is more suitable to manipulate cell migration, and which, to manipulate cell signaling? We review here the differences in forces sensation to control and engineer cellular processes inside and outside the cell, with a special focus on neuronal cells. In addition, we discuss technical details and limitations of different force-mediating approaches and highlight recent advancements of nanomagnetics in cell organization, communication, signaling, and intracellular trafficking. Finally, we give suggestions about how force-mediating nanoparticles can be used to our advantage in next-generation neurotherapeutic devices.
Proceedings of the Augmented VIsual Display (AVID) Research Workshop
NASA Technical Reports Server (NTRS)
Kaiser, Mary K. (Editor); Sweet, Barbara T. (Editor)
1993-01-01
The papers, abstracts, and presentations were presented at a three day workshop focused on sensor modeling and simulation, and image enhancement, processing, and fusion. The technical sessions emphasized how sensor technology can be used to create visual imagery adequate for aircraft control and operations. Participants from industry, government, and academic laboratories contributed to panels on Sensor Systems, Sensor Modeling, Sensor Fusion, Image Processing (Computer and Human Vision), and Image Evaluation and Metrics.
Nuclear Waste: Defense Waste Processing Facility-Cost, Schedule, and Technical Issues.
1992-06-17
gallons of high-level radioactive waste stored in underground tanks at the savannah major facility involved Is the Defense Waste Processing Facility ( DwPF ...As a result of concerns about potential problems with the DWPF and delays in its scheduled start-up, the Chairman of the Environment, Energy, and...Natural Resources Subcommittee, House Committee on Government Operations, asked GAO to review the status of the DWPF and other facilities. This report
Materials experiment carrier concepts definition study. Volume 2: Technical report, part 2
NASA Technical Reports Server (NTRS)
1981-01-01
A materials experiment carrier (MEC) that provides effective accommodation of the given baseline materials processing in space (MPS) payloads and demonstration of the MPS platform concept for high priority materials processing science, multidiscipline MPS investigations, host carrier for commercial MPS payloads, and system economy of orbital operations is defined. The study flow of task work is shown. Study tasks featured analysis and trades to identify the MEC system concept options.
Elegant space systems: How do we get there?
NASA Astrophysics Data System (ADS)
Salado, Alejandro; Nilchiani, Roshanak
Can the space industry produce elegant systems? If so, how? Space systems development has become process-centric, e.g., process creation or modification is the default response to most development and/or operations challenges when problems are encountered. But is that really effective? An increasing number of researchers and practitioners disagree with such an approach and suggest that elegance is as important to a system and its operation as fulfillment of technical and contractual requirements; consequently they are proposing a review and refreshment of the systems engineering practice. Elegance is generally recognizable, but hard to achieve deterministically. The research community has begun an endeavor to define what elegance is in systems engineering terms, find ways to measure or at least characterize it, and create or adapt philosophies and methodologies that promote elegance as a design objective (driver?). This paper asserts that while elegance cannot be engineered in a traditional sense, it can emerge as a natural result of design activity. This needs to be enabled and can be facilitated, but ultimately depends on the talent of the design teams as individuals and as a group. This paper summarizes existing technical definitions of elegance and discusses a) how it can be pursued and b) cultural conditions and habits that help elegance emerge during the development and operation of a space system.
Dynamic Modeling of Yield and Particle Size Distribution in Continuous Bayer Precipitation
NASA Astrophysics Data System (ADS)
Stephenson, Jerry L.; Kapraun, Chris
Process engineers at Alcoa's Point Comfort refinery are using a dynamic model of the Bayer precipitation area to evaluate options in operating strategies. The dynamic model, a joint development effort between Point Comfort and the Alcoa Technical Center, predicts process yields, particle size distributions and occluded soda levels for various flowsheet configurations of the precipitation and classification circuit. In addition to rigorous heat, material and particle population balances, the model includes mechanistic kinetic expressions for particle growth and agglomeration and semi-empirical kinetics for nucleation and attrition. The kinetic parameters have been tuned to Point Comfort's operating data, with excellent matches between the model results and plant data. The model is written for the ACSL dynamic simulation program with specifically developed input/output graphical user interfaces to provide a user-friendly tool. Features such as a seed charge controller enhance the model's usefulness for evaluating operating conditions and process control approaches.
1996 DOE technical standards program workshop: Proceedings
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
The workshop theme is `The Strategic Standardization Initiative - A Technology Exchange and Global Competitiveness Challenge for DOE.` The workshop goal is to inform the DOE technical standards community of strategic standardization activities taking place in the Department, other Government agencies, standards developing organizations, and industry. Individuals working on technical standards will be challenged to improve cooperation and communications with the involved organizations in response to the initiative. Workshop sessions include presentations by representatives from various Government agencies that focus on coordination among and participation of Government personnel in the voluntary standards process; reports by standards organizations, industry, and DOEmore » representatives on current technology exchange programs; and how the road ahead appears for `information superhighway` standardization. Another session highlights successful standardization case studies selected from several sites across the DOE complex. The workshop concludes with a panel discussion on the goals and objectives of the DOE Technical Standards Program as envisioned by senior DOE management. The annual workshop on technical standards has proven to be an effective medium for communicating information related to standards throughout the DOE community. Technical standards are used to transfer technology and standardize work processes to produce consistent, acceptable results. They provide a practical solution to the Department`s challenge to protect the environment and the health and safety of the public and workers during all facility operations. Through standards, the technologies of industries and governments worldwide are available to DOE. The DOE Technical Standards Program, a Department-wide effort that crosscuts all organizations and disciplines, links the Department to those technologies.« less
Features of electric drive sucker rod pumps for oil production
NASA Astrophysics Data System (ADS)
Gizatullin, F. A.; Khakimyanov, M. I.; Khusainov, F. F.
2018-01-01
This article is about modes of operation of electric drives of downhole sucker rod pumps. Downhole oil production processes are very energy intensive. Oil fields contain many oil wells; many of them operate in inefficient modes with significant additional losses. Authors propose technical solutions to improve energy performance of a pump unit drives: counterweight balancing, reducing of electric motor power, replacing induction motors with permanent magnet motors, replacing balancer drives with chain drives, using of variable frequency drives.
The National Geospatial Technical Operations Center
Craun, Kari J.; Constance, Eric W.; Donnelly, Jay; Newell, Mark R.
2009-01-01
The United States Geological Survey (USGS) National Geospatial Technical Operations Center (NGTOC) provides geospatial technical expertise in support of the National Geospatial Program in its development of The National Map, National Atlas of the United States, and implementation of key components of the National Spatial Data Infrastructure (NSDI).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kimmell, T.; Folga, S., Frey, G.; Molberg, J.
2001-04-30
This volume of the Technical Resource Document (TRD) for the ''Environmental Impact Statement (EIS) for the Design, Construction and Operation of One or More Pilot Test Facilities for Assembled Chemical Weapons Destruction Technologies at One or More Sites'' (PMACWA 2001c) pertains to the destruction of assembled chemical weapons (ACW) stored at Pueblo Chemical Depot (PCD), located outside Pueblo, Colorado. This volume presents technical and process information on each of the destruction technologies applicable to treatment of the specific ACW stored at PCD. The destruction technologies described are those that have been demonstrated during Phase I of the Assembled Chemical Weaponsmore » Assessment (ACWA) demonstration process (see Volume 1).« less
Work-Facilitating Information Visualization Techniques for Complex Wastewater Systems
NASA Astrophysics Data System (ADS)
Ebert, Achim; Einsfeld, Katja
The design and the operation of urban drainage systems and wastewater treatment plants (WWTP) have become increasingly complex. This complexity is due to increased requirements concerning process technology, technical, environmental, economical, and occupational safety aspects. The plant operator has access not only to some timeworn filers and measured parameters but also to numerous on-line and off-line parameters that characterize the current state of the plant in detail. Moreover, expert databases and specific support pages of plant manufactures are accessible through the World Wide Web. Thus, the operator is overwhelmed with predominantly unstructured data.
Stoller, Marco; Ochando-Pulido, Javier Miguel; Field, Robert
2017-07-14
In the last decades, membrane processes have gained a significant share of the market for wastewater purification. Although the product (i.e., purified water) is not of high added value, these processes are feasible both technically and from an economic point of view, provided the flux is relatively high and that membrane fouling is strongly inhibited. By controlling membrane fouling, the membrane may work for years without service, thus dramatically reducing operating costs and the need for membrane substitution. There is tension between operating at high permeate fluxes, which enhances fouling but reduces capital costs, and operating at lower fluxes which increases capital costs. Operating batch membrane processes leads to increased difficulties, since the feed fed to the membrane changes as a function of the recovery value. This paper is concerned with the operation of such a process. Membrane process designers should therefore avoid membrane fouling by operating membranes away from the permeate flux point where severe fouling is triggered. The design and operation of membrane purification plants is a difficult task, and the precision to properly describe the evolution of the fouling phenomenon as a function of the operating conditions is a key to success. Many reported works have reported on the control of fouling by operating below the boundary flux. On the other hand, only a few works have successfully sought to exploit super-boundary operating conditions; most super-boundary operations are reported to have led to process failures. In this work, both sub- and super-boundary operating conditions for a batch nanofiltration membrane process used for olive mill wastewater treatment were investigated. A model to identify a priori the point of transition from a sub-boundary to a super-boundary operation during a batch operation was developed, and this will provide membrane designers with a helpful tool to carefully avoid process failures.
REIMR: A Process for Utilizing Propulsion-Oriented 'Lessons-Learned' to Mitigate Development Risk
NASA Technical Reports Server (NTRS)
Ballard, Richard O.; Brown, Kendall K.
2005-01-01
This paper is a summary overview of a study conducted a t the NASA Marshall Space Flight Center (MSFC) during the initial phases of the Space Launch Initiative (SLI) program to evaluate a large number of technical problems associated with the design, development, test, evaluation and operation of several major liquid propellant rocket engine systems (i.e., SSME, Fastrac, J-2, F-1). The results of this study was the identification of the "Fundamental Root Causes" that enabled the technical problems to manifest, and practices that can be implemented to prevent them from recurring in future engine development efforts. This paper will discus the Fundamental Root Causes, cite some examples of how the technical problems arose from them, and provide a discussion of how they can be mitigated or avoided.
Procurement engineering - the productivity factor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bargerstock, S.B.
1993-01-01
The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment.more » Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station.« less
Panteleimonitis, Sofoklis; Harper, Mick; Hall, Stuart; Figueiredo, Nuno; Qureshi, Tahseen; Parvaiz, Amjad
2017-09-15
Robotic rectal surgery is becoming increasingly more popular among colorectal surgeons. However, time spent on robotic platform docking, arm clashing and undocking of the platform during the procedure are factors that surgeons often find cumbersome and time consuming. The newest surgical platform, the da Vinci Xi, coupled with integrated table motion can help to overcome these problems. This technical note aims to describe a standardised operative technique of single docking robotic rectal surgery using the da Vinci Xi system and integrated table motion. A stepwise approach of the da Vinci docking process and surgical technique is described accompanied by an intra-operative video that demonstrates this technique. We also present data collected from a prospectively maintained database. 33 consecutive rectal cancer patients (24 male, 9 female) received robotic rectal surgery with the da Vinci Xi during the preparation of this technical note. 29 (88%) patients had anterior resections, and four (12%) had abdominoperineal excisions. There were no conversions, no anastomotic leaks and no mortality. Median operation time was 331 (249-372) min, blood loss 20 (20-45) mls and length of stay 6.5 (4-8) days. 30-day readmission rate and re-operation rates were 3% (n = 1). This standardised technique of single docking robotic rectal surgery with the da Vinci Xi is safe, feasible and reproducible. The technological advances of the new robotic system facilitate the totally robotic single docking approach.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-03
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-2124-000] Midcontinent Independent System Operator, Inc.; Supplemental Notice Concerning Post-Technical Conference Comments As announced in the Notice of Technical Conference issued on October 25, 2013, and as required in the...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
CMMI (Trademark) for Acquisition, Version 1.2
2007-11-01
conjunction with the development of the operational concept to derive more detailed and prec inclu even t . The level of detail of contractual...technical solution, different products or product components ma suppliers. idate Requirem Requirements Ana t the intended operational environment will have...Technical Solutions SP 1.1 Select Technical So SP 1.2 Analyze Selected T SP 1.3 Conduct Technical SG 2 Perform Interface Managemen SP 2.1 Select
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eggeman, Tim; O'Neill, Brian
2016-08-17
ZeaChem Inc. and US DOE successfully demonstrated the ZeaChem process for producing sugars and ethanol from high-impact biomass feedstocks. The project was executed over a 5-year period under a $31.25 million cooperative agreement (80:20 Federal:ZeaChem cost share). The project was managed by dividing it into three budget periods. Activities during Budget Period 1 were limited to planning, permitting, and other pre-construction planning. Budget Period 2 activities included engineering, procurement, construction, commissioning, start-up and initial operations through the Independent Engineer Test Runs. The scope of construction was limited to the Chem Frac and Hydrogenolysis units, as the Core Facility was alreadymore » in place. Construction was complete in December 2012, and the first cellulosic ethanol was produced in February 2013. Additional operational test runs were conducted during Budget Period 3 (completed June 2015) using hybrid poplar, corn stover, and wheat straw feedstocks, resulting in the production of cellulosic ethanol and various other biorefinery intermediates. The research adds to the understanding of the Chem Frac and Hydrogenolysis technologies in that the technical performance of each unit was measured, and the resulting data and operational experience can be used as the basis for engineering designs, thus mitigating risks for deployment in future commercial facilities. The Chem Frac unit was initially designed to be operated as two-stage dilute acid hydrolysis, with first stage conditions selected to remove the hemicellulose fraction of the feedstock, and the second stage conditions selected to remove the cellulose fraction. While the Chem Frac unit met or exceeded the design capacity of 10 ton(dry)/day, the technical effectiveness of the Chem Frac unit was below expectations in its initial two-stage dilute acid configuration. The sugars yields were low, the sugars were dilute, and the sugars had poor fermentability caused by excessive inhibitors from wood breakdown products, resulting in a non-viable process from an economic point of view. Later runs with the Chem Frac unit switched to a configuration that used dilute acid pretreatment followed by enzymatic hydrolysis. This change improved yield, increased sugar concentrations, and improved fermentability of sugars. The Hydrogenolysis unit met or exceeded all expectations with respect to unit capacity, technical performance, and economic performance. The US DOE funds for the project were provided through the American Recovery and Reinvestment Act of 2009. In addition to the scientific/technical merit of the project, this project benefited the public through the creation of approximately 75 onsite direct construction-related jobs, 25 direct on-going operations-related jobs, plus numerous indirect jobs, and thus was well aligned with the goals of the American Recovery and Reinvestment Act of 2009.« less
Agarwal, Manu; Tardio, James; Venkata Mohan, S
2013-11-01
To understand the potential of cellulosic based municipal waste as a renewable feed-stock, application of pyrolysis by biorefinery approach was comprehensively studied for its practicable application towards technical and environmental viability in Indian context. In India, where the energy requirements are high, the pyrolysis of the cellulosic waste shows numerous advantages for its applicability as a potential waste-to-energy technology. The multiple energy outputs of the process viz., bio-gas, bio-oil and bio-char can serve the two major energy sectors, viz., electricity and transportation. The process suits best for high bio-gas and electrical energy production when energy input is satisfied from bio-char in form of steam (scheme-1). The bio-gas generated through the process shows its direct utility as a transportation fuel while the bio-oil produced can serve as fuel or raw material to chemical synthesis. On a commercial scale the process is a potent technology towards sustainable development. The process is self-sustained when operated on a continuous mode. Copyright © 2013 Elsevier Ltd. All rights reserved.
Hybrid laser arc welding: State-of-art review
NASA Astrophysics Data System (ADS)
Acherjee, Bappa
2018-02-01
Hybrid laser arc welding simultaneously utilizes the arc welding and the laser welding, in a common interaction zone. The synergic effects of laser beam and eclectic arc in the same weld pool results in an increase of welding speed and penetration depth along with the enhancement of gap bridging capability and process stability. This paper presents the current status of this hybrid technique in terms of research, developments and applications. Effort is made to present a comprehensive technical know-how about this process through a systematic review of research articles, industrial catalogues, technical notes, etc. In the introductory part of the review, an overview of the hybrid laser arc welding is presented, including operation principle, process requirements, historical developments, benefits and drawbacks of the process. This is followed by a detailed discussion on control parameters those govern the performance of hybrid laser arc welding process. Thereafter, a report of improvements of performance and weld qualities achieved by using hybrid welding process is presented based on review of several research papers. The succeeding sections furnish the examples of industrial applications and the concluding remarks.
NASA Technical Reports Server (NTRS)
1994-01-01
This manual presents a series of recommended techniques that can increase overall operational effectiveness of both flight and ground based NASA systems. It provides a set of tools that minimizes risk associated with: (1) restoring failed functions (both ground and flight based); (2) conducting complex and highly visible maintenance operations; and (3) sustaining a technical capability to support the NASA mission using aging equipment or facilities. It considers (1) program management - key elements of an effective maintainability effort; (2) design and development - techniques that have benefited previous programs; (3) analysis and test - quantitative and qualitative analysis processes and testing techniques; and (4) operations and operational design techniques that address NASA field experience. This document is a valuable resource for continuous improvement ideas in executing the systems development process in accordance with the NASA 'better, faster, smaller, and cheaper' goal without compromising safety.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, L.E.; McGuire, D.R.
1984-05-01
This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly totalmore » than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.« less
7 CFR 610.23 - State Technical Committee meetings.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Technical Committee member. (b) NRCS will establish and maintain national standard operating procedures... standard operating procedures will outline items such as: The best practice approach to establishing... standard operating procedures established under paragraph (b) of this section, the State Conservationist...
7 CFR 610.23 - State Technical Committee meetings.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Technical Committee member. (b) NRCS will establish and maintain national standard operating procedures... standard operating procedures will outline items such as: The best practice approach to establishing... standard operating procedures established under paragraph (b) of this section, the State Conservationist...
7 CFR 610.23 - State Technical Committee meetings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Technical Committee member. (b) NRCS will establish and maintain national standard operating procedures... standard operating procedures will outline items such as: The best practice approach to establishing... standard operating procedures established under paragraph (b) of this section, the State Conservationist...
7 CFR 610.23 - State Technical Committee meetings.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Technical Committee member. (b) NRCS will establish and maintain national standard operating procedures... standard operating procedures will outline items such as: The best practice approach to establishing... standard operating procedures established under paragraph (b) of this section, the State Conservationist...
7 CFR 610.23 - State Technical Committee meetings.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Technical Committee member. (b) NRCS will establish and maintain national standard operating procedures... standard operating procedures will outline items such as: The best practice approach to establishing... standard operating procedures established under paragraph (b) of this section, the State Conservationist...
System engineering of the Atacama Large Millimeter/submillimeter Array
NASA Astrophysics Data System (ADS)
Bhatia, Ravinder; Marti, Javier; Sugimoto, Masahiro; Sramek, Richard; Miccolis, Maurizio; Morita, Koh-Ichiro; Arancibia, Demián.; Araya, Andrea; Asayama, Shin'ichiro; Barkats, Denis; Brito, Rodrigo; Brundage, William; Grammer, Wes; Haupt, Christoph; Kurlandczyk, Herve; Mizuno, Norikazu; Napier, Peter; Pizarro, Eduardo; Saini, Kamaljeet; Stahlman, Gretchen; Verzichelli, Gianluca; Whyborn, Nick; Yagoubov, Pavel
2012-09-01
The Atacama Large Millimeter/submillimeter Array (ALMA) will be composed of 66 high precision antennae located at 5000 meters altitude in northern Chile. This paper will present the methodology, tools and processes adopted to system engineer a project of high technical complexity, by system engineering teams that are remotely located and from different cultures, and in accordance with a demanding schedule and within tight financial constraints. The technical and organizational complexity of ALMA requires a disciplined approach to the definition, implementation and verification of the ALMA requirements. During the development phase, System Engineering chairs all technical reviews and facilitates the resolution of technical conflicts. We have developed analysis tools to analyze the system performance, incorporating key parameters that contribute to the ultimate performance, and are modeled using best estimates and/or measured values obtained during test campaigns. Strict tracking and control of the technical budgets ensures that the different parts of the system can operate together as a whole within ALMA boundary conditions. System Engineering is responsible for acceptances of the thousands of hardware items delivered to Chile, and also supports the software acceptance process. In addition, System Engineering leads the troubleshooting efforts during testing phases of the construction project. Finally, the team is conducting System level verification and diagnostics activities to assess the overall performance of the observatory. This paper will also share lessons learned from these system engineering and verification approaches.
Process Modeling and Dynamic Simulation for EAST Helium Refrigerator
NASA Astrophysics Data System (ADS)
Lu, Xiaofei; Fu, Peng; Zhuang, Ming; Qiu, Lilong; Hu, Liangbing
2016-06-01
In this paper, the process modeling and dynamic simulation for the EAST helium refrigerator has been completed. The cryogenic process model is described and the main components are customized in detail. The process model is controlled by the PLC simulator, and the realtime communication between the process model and the controllers is achieved by a customized interface. Validation of the process model has been confirmed based on EAST experimental data during the cool down process of 300-80 K. Simulation results indicate that this process simulator is able to reproduce dynamic behaviors of the EAST helium refrigerator very well for the operation of long pulsed plasma discharge. The cryogenic process simulator based on control architecture is available for operation optimization and control design of EAST cryogenic systems to cope with the long pulsed heat loads in the future. supported by National Natural Science Foundation of China (No. 51306195) and Key Laboratory of Cryogenics, Technical Institute of Physics and Chemistry, CAS (No. CRYO201408)
Operation Greenhouse: Communications
1951-01-01
jottication •__ By,. , Dtsl•-bution1 TECHNICAL REPORT mailability Code’s Avait and -or Dist Special COMMUNICATIONS OPERATION GREENHOUSE 1951 COMMANDED BY...stem GREENHOUSE to include technical informa- therefrom. tion and operational experience not desirable Details of operation, such as call sign, fre- for...Atomic planning, organization, and engineering for Weapons Proving Ground. Where, in this re- Operation GREENHOUSE , since the solution port, reference is
NASA Astrophysics Data System (ADS)
Kondrashov, V. P.; Pogrebisskiy, M. Ya; Lykov, A. G.; Rabinovich, V. L.; Bulgakov, A. S.
2018-02-01
Ways of increase of ore-heating electric furnaces, used for production of silicomanganese, engineering-and-economical performance are analyzed. Questions of data of the electric, thermal and technological modes of the furnace functioning collecting and processing for use in operation of an advanced control system of the furnace providing increase in technical and economic efficiency of technological process and an adaptability to quality of burden stock are considered.
2014-09-01
elements of functional structure. Frequently the requirement for this is to ensure long- term retention of skilled people through the provision of an...operational and manufacturable, greatly reducing the design work remaining for Milestone C. 14. SUBJECT TERMS System Architecture, manufacturing...specialized ammunition technology item such as a fuze takes too long, from initial concept through final production design, which is approved for
Low Voltage Electron Beam Processing Final Report CRADA No. TC-645-93-A
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, H.; Wakalopulos, G.
This CRADA project was established to develop a small, inexpensive sealed-tube electron beam processing system having immediate applications in industrial, high speed manufacturing processes, and in the Department of Energy (DOE) waste treatment/cleanup operations. The technical work involved the development and demonstration of a compact, sealed, 50-75 kilovolt (kV) EB generator prototype, including controls and power supply. The specific goals of this project were to develop a low cost vacuum tube capable of shooting an electron beam several inches into the air, and to demonstrate that wide area materials processing is feasible by stacking the tubes to produce continuous beams.more » During the project, we successfully demonstrated the producibility of a low cost electron beam system and several material processing operations of interest to US industry, DOE and, since September 11, 2001, the Homeland Security.« less
Engineering of Impulse Mechanism for Mechanical Hander Power Tools
NASA Astrophysics Data System (ADS)
Nikolaevich Drozdov, Anatoliy
2018-03-01
The solution to the problem of human security in cities should be considered on the basis of an integrated and multidisciplinary approach, including issues of security and ecology in the application of technical means used to ensure the viability and development of technocracy. In this regard, an important task is the creation of a safe technique with improved environmental properties with high technological characteristics. This primarily relates to mechanised tool — the division of technological machines with built in engines is that their weight is fully or partially perceived by the operator’s hands, making the flow and control of the car. For this subclass of machines is characterized by certain features: a built-in motor, perception of at least part of their weight by the operator during the work, the implementation of feeding and management at the expense of the muscular power of the operator. Therefore, among the commonly accepted technical and economic characteristics, machines in this case, important ergonomic (ergonomics), regulation of levels which ensures the safety of the operator. To ergonomics include vibration, noise characteristics, mass, and force feeding machine operator. Vibration is a consequence of the dynamism of the system operator machine - processed object (environment) in which the engine energy is redistributed among all the structures, causing their instability. In the machine vibration caused by technological and constructive (transformative mechanisms) unbalance of individual parts of the drive, the presence of technological and design (impact mechanisms) clearances and other reasons. This article describes a new design of impulse mechanism for hander power tools (wrenches, screwdrivers) with enhanced torque. The article substantiates a simulation model of dynamic compression process in an operating chamber during impact, provides simulation results and outlines further lines of research.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to managemore » and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.« less
ERIC Educational Resources Information Center
Ohio State Univ., Columbus. National Center for Research in Vocational Education.
This military-developed text contains the second section of a four-part course to train environmental support specialists. Covered in the individual course blocks are operative principles of water treatment plants (principles of water treatment plants, the clarification process, water systems filters, chemical disinfection, taste and odor control,…
1985-03-20
views or attitudes of the U.S. Government. PROCUREMENT OF PUBLICATIONS JPIRS publications may be ordered from the National Technical Information...Washington, D.C. 20402. Correspondence pertaining to matters other than procurement may be addressed to Joint Publications Research Service, 1000 North Glebe...capital in Indonesia. Besides making jobs for Indonesians, such investment will afford opportunities to businesses without wood processing operations
ERIC Educational Resources Information Center
Hulse, Ira; And Others
One of six documents describing the Management Information System for Vocational Education (MISVE), this document is intended for MISVE managers and electronic data processing (EDP) operations staff who would be responsible for the implementation and maintenance of the MISVE on the computer. (MISVE was designed to provide users with an advanced…
Dredging: An Annotated Bibliography on Operations, Equipment, and Processes. Revision.
1982-03-01
establishing producing centers, enterprises, financial planning, and technical specifications for plant and equipment. Drilling and laboratory results are...summarised, and resource, market, technological and environmental bases described. Prospect drilling of calcareous sandstone (kurkar and calcarenite...Automation; Pumps and impellers; Cavitation; Cost and econ- omy of dredging; Drilling and blasting; Spoil disposal; Deep sea dredg- ing; River dredging
Dimensions of Open Research: Critical Reflections on Openness in the ROER4D Project
ERIC Educational Resources Information Center
King, Thomas; Hodgkinson-Williams, Cheryl; Willmers, Michelle; Walji, Sukaina
2016-01-01
Open Research has the potential to advance the scientific process by improving the transparency, rigour, scope and reach of research, but choosing to experiment with Open Research carries with it a set of ideological, legal, technical and operational considerations. Researchers, especially those in resource-constrained situations, may not be aware…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sorokin, A.P.; Rimkevich, V.S.; Dem'yanova, L.P.
2009-05-15
Based on the physico-technical operations involved in the mineral processing technologies, the optimal production conditions are found for refractory fiber materials, aluminium, silicium, their compounds and other valued components. Ecologically safe and efficient aggregate technologies are developed for recovery of valued components from nonmetallic minerals and anthracides (brown coals).
NASA Technical Reports Server (NTRS)
Kezirian, M. T.
2007-01-01
As NASA implements the nation's Vision for Space Exploration to return to the moon and travel to Mars, new considerations will be be given to the processes governing design and operations of manned spaceflight. New objectives bring new technical challenges; Safety will drive many of these decisions.
2006-04-01
8 Figure 5 : Threat and Operational Risk .................................................................... 9 Figure 6: Work Process...technical note might be applied to selected risk management topics. Finally, Section 5 , “Conclusion,” completes the report by summarizing the history...addressed in Section 5 . CMU/SEI-2006-TN-014 5 So far, our discussion has focused on the conceptual aspects of risk . The next section explores risk’s
Dynamic Environmental Qualification Techniques.
1981-12-01
environments peculiar to military operations and requirements. numerous dynamic qualification test methods have been established. It was the purpose...requires the achievement of the highest practicable degree in the standard- ization of items, materials and engineering practices within the...standard is described as "A document that established engineering and technical requirements for processes, pro’cedures, practices and methods that have
Operational Group Sandy technical progress report
,
2013-01-01
This report documents results from the March 2013 deployment of the OGS. It includes background information on Hurricane Sandy and the federal response; the OGS methodology; scenarios for Hurricane Sandy’s impact on coastal communities and urban ecosystems; potential interventions to improve regional resilience to future major storms; a discussion of scenario results; and lessons learned about the OGS process.
DESIGN PRINCIPLES FOR AN ON-LINE INFORMATION RETRIEVAL SYSTEM. TECHNICAL REPORT.
ERIC Educational Resources Information Center
LOWE, THOMAS C.
AREAS INVESTIGATED INCLUDE SLOW MEMORY DATA STORAGE, THE PROBLEM OF DECODING FROM AN INDEX TO A SLOW MEMORY ADDRESS, THE STRUCTURE OF DATA LISTS AND DATA LIST OPERATORS, COMMUNICATIONS BETWEEN THE HUMAN USER AND THE SYSTEM, PROCESSING OF RETRIEVAL REQUESTS, AND THE USER'S CONTROL OVER THE RETURN OF INFORMATION RETRIEVED. LINEAR, LINKED AND…
Command and Control: US Army Staffs and the Operations Process
2016-05-26
Architecture , 2nd ed. (New York: Elsevier, 2006). 2...Mainly technical experts in logistics and engineering, these proto-staff officers enabled both the Egyptian and Assyrian empires to conquer many of...Platform for Designing Business Architecture . New York: Elsevier, 2006, 2d edition. Gilbert, Felix. “Machiavelli: The Renaissance of the Art of War.” In
ATS-6 - Technical aspects of the Health/Education Telecommunications Experiment
NASA Technical Reports Server (NTRS)
Boor, J. L.; Braunstein, J.; Janky, J. M.; Ogden, D.; Potter, J. G.; Harper, E. L.; Volkmer, E.; Whalen, A. A.; Henderson, E.; Hupe, H. H.
1975-01-01
An overview is given of the HET experiment on ATS-6. The paper is divided into nine parts, including a technical overview, a preliminary evaluation of the HET demonstration, a review of operations at the Denver uplink terminal, a discussion of remote ground terminals, a review of C-band comprehensive terminals and of S-band comprehensive terminals, and parts devoted to general network operations, technical management and effectiveness of the network, and the site equipment operator.
Power system restoration - A task force report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adibi, M.; Clelland, P.; Link, L.
1987-05-01
The IEEE PES System Operation Subcommittee has established the Power System Restoration Task Force to: review operating practices, conduct a literature search, prepare relevant glossaries and bibliographies, and promote information exchange through technical papers. This is the first report of the Task Force. The problem of bulk power system restoration following a complete or partial collapse is practically as old as the electric utility industry itself. Many electric utilities have developed over the years system restoration schemes that meet the needs of their particular systems. These plans provide a great deal of insight into how the restorative process is viewedmore » by operating and planning personnel and what concerns and constraints any plan must operate under.« less
NASA Space Environments Technical Discipline Team Space Weather Activities
NASA Astrophysics Data System (ADS)
Minow, J. I.; Nicholas, A. C.; Parker, L. N.; Xapsos, M.; Walker, P. W.; Stauffer, C.
2017-12-01
The Space Environment Technical Discipline Team (TDT) is a technical organization led by NASA's Technical Fellow for Space Environments that supports NASA's Office of the Chief Engineer through the NASA Engineering and Safety Center. The Space Environments TDT conducts independent technical assessments related to the space environment and space weather impacts on spacecraft for NASA programs and provides technical expertise to NASA management and programs where required. This presentation will highlight the status of applied space weather activities within the Space Environment TDT that support development of operational space weather applications and a better understanding of the impacts of space weather on space systems. We will first discuss a tool that has been developed for evaluating space weather launch constraints that are used to protect launch vehicles from hazardous space weather. We then describe an effort to better characterize three-dimensional radiation transport for CubeSat spacecraft and processing of micro-dosimeter data from the International Space Station which the team plans to make available to the space science community. Finally, we will conclude with a quick description of an effort to maintain access to the real-time solar wind data provided by the Advanced Composition Explorer satellite at the Sun-Earth L1 point.
Nepveux, Kevin; Sherlock, Jon-Paul; Futran, Mauricio; Thien, Michael; Krumme, Markus
2015-03-01
Continuous manufacturing (CM) is a process technology that has been used in the chemical industry for large-scale mass production of chemicals in single-purpose plants with benefit for many years. Recent interest has been raised to expand CM into the low-volume, high-value pharmaceutical business with its unique requirements regarding readiness for human use and the required quality, supply chain, and liability constraints in this business context. Using a fairly abstract set of definitions, this paper derives technical consequences of CM in different scenarios along the development-launch-supply axis in different business models and how they compare to batch processes. Impact of CM on functions in development is discussed and several operational models suitable for originators and other business models are discussed and specific aspects of CM are deduced from CM's technical characteristics. Organizational structures of current operations typically can support CM implementations with just minor refinements if the CM technology is limited to single steps or small sequences (bin-to-bin approach) and if the appropriate technical skill set is available. In such cases, a small, dedicated group focused on CM is recommended. The manufacturing strategy, as centralized versus decentralized in light of CM processes, is discussed and the potential impact of significantly shortened supply lead times on the organization that runs these processes. The ultimate CM implementation may be seen by some as a totally integrated monolithic plant, one that unifies chemistry and pharmaceutical operations into one plant. The organization supporting this approach will have to reflect this change in scope and responsibility. The other extreme, admittedly futuristic at this point, would be a highly decentralized approach with multiple smaller hubs; this would require a new and different organizational structure. This processing approach would open up new opportunities for products that, because of stability constraints or individualization to patients, do not allow centralized manufacturing approaches at all. Again, the entire enterprise needs to be restructured accordingly. The situation of CM in an outsourced operation business model is discussed. Next steps for the industry are recommended. In summary, opportunistic implementation of isolated steps in existing portfolios can be implemented with minimal organizational changes; the availability of the appropriate skills is the determining factor. The implementation of more substantial sequences requires business processes that consider the portfolio, not just single products. Exploration and implementation of complete process chains with consequences for quality decisions do require appropriate organizational support. © 2015 Wiley Periodicals, Inc. and the American Pharmacists Association. © 2014 Wiley Periodicals, Inc. and the American Pharmacists Association.
Federsel, Hans-Jürgen
2009-05-19
In process research and development (PR&D), the generation and manipulation of small-molecule drugs ranges from bench-scale (laboratory) chemistry to pilot plant manufacture to commercial production. A broad range of disciplines, including process chemistry (organic synthesis), analytical chemistry, process engineering (mass and heat transfer, unit operations), process safety (chemical risk assessment), regulatory compliance, and plant operation, must be effectively applied. In the critical handover between medicinal chemistry and PR&D, compound production is typically scaled up from a few hundred grams to several kilograms. Can the methodologies applied to the former also satisfy the technical, safety, and scalability aspects that come into play in the latter? Occasionally, the transition might occur smoothly, but more often the situation is the opposite: much work and resources must be invested to design a process that is feasible for manufacturing on pilot scale and, eventually, for commercial production. Authentic examples provide enlightening illustrations of dos and don'ts for developing syntheses designed for round-flask operation into production-scale processes. Factors that are easily underestimated or even neglected in the laboratory, such as method robustness, chemical hazards, safety concerns, environmental impact, availability of starting materials and building blocks in bulk quantities, intellectual property (IP) issues, and the final cost of the product, will come into play and need to be addressed appropriately. The decision on which route will be the best for further development is a crucial event and should come into focus early on the R&D timeline. In addition to scientific and technical concerns, the parameter of speed has come to the forefront in the pharmaceutical arena. Although historically the drug industry has tolerated a total time investment of far more than 10 years from idea to market, the current worldwide paradigm requires a reduction to under 10 years for the specific segment covering preclinical development through launch. This change puts enormous pressure on the entire organization, and the implication for PR&D is that the time allowed for conducting route design and scale-up has shrunk accordingly. Furthermore, molecular complexity has become extremely challenging in many instances, and demand steadily grows for process understanding and knowledge generation about low-level byproduct, which often must be controlled even at trace concentrations to meet regulatory specifications (especially in the case of potentially genotoxic impurities). In this Account, we paint a broad picture of the technical challenges the PR&D community is grappling with today, focusing on what measures have been taken over the years to create more efficiency and effectiveness.
Technical Operating Procedures for Resource Documentation Under the Oil Pollution Act of 1990
DOT National Transportation Integrated Search
1996-06-01
Technical Operating Procedures (TOPs) for Resource Documentation under the Oil Pollution Act of 1990 (P.L.101-380) have been developed to provide guidance to users operating as, or in support of, the Federal On-Scene Coordinator(FOSC). The procedures...
NASA Astrophysics Data System (ADS)
1990-10-01
The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.
Purpose, Principles, and Challenges of the NASA Engineering and Safety Center
NASA Technical Reports Server (NTRS)
Gilbert, Michael G.
2016-01-01
NASA formed the NASA Engineering and Safety Center in 2003 following the Space Shuttle Columbia accident. It is an Agency level, program-independent engineering resource supporting NASA's missions, programs, and projects. It functions to identify, resolve, and communicate engineering issues, risks, and, particularly, alternative technical opinions, to NASA senior management. The goal is to help ensure fully informed, risk-based programmatic and operational decision-making processes. To date, the NASA Engineering and Safety Center (NESC) has conducted or is actively working over 600 technical studies and projects, spread across all NASA Mission Directorates, and for various other U.S. Government and non-governmental agencies and organizations. Since inception, NESC human spaceflight related activities, in particular, have transitioned from Shuttle Return-to-Flight and completion of the International Space Station (ISS) to ISS operations and Orion Multi-purpose Crew Vehicle (MPCV), Space Launch System (SLS), and Commercial Crew Program (CCP) vehicle design, integration, test, and certification. This transition has changed the character of NESC studies. For these development programs, the NESC must operate in a broader, system-level design and certification context as compared to the reactive, time-critical, hardware specific nature of flight operations support.
Optics education for machine operators in the semiconductor industry: moving beyond button pushing
NASA Astrophysics Data System (ADS)
Karakekes, Meg; Currier, Deborah
1995-10-01
In the competitive semiconductor manufacturing industry, employees who operate equipment are able to make greater contributions if they understand how the equipment works. By understanding the 'why' behind the 'what', the equipment operators can better partner with other technical staff to produce quality integrated circuits efficiently and effectively. This additional knowledge also opens equipment operators to job enrichment and enlargement opportunities. Advanced Micro Devices (AMD) is in the process of upgrading the skills of its equipment operators. This paper is an overview of a pilot program that employs optics education to upgrade stepper operators' skills. The paper starts with stepper tasks that require optics knowledge, examines teaching methods, reports both end-of-course and three months post-training knowledge retention, and summarizes how the training has impacted the production floor.
The composing process in technical communication
NASA Technical Reports Server (NTRS)
Masse, R. E.
1981-01-01
The theory and application of the composing process in technical communications is addressed. The composing process of engineers, some implications for composing research for the teaching and research of technical communication, and an interpretation of the processes as creative experience are also discussed. Two areas of technical communications summarized concern: the rhetorical features of technical communications, and the theoretical background for a process-based view, a problem-solving approach to technical writing.
NASA Technical Reports Server (NTRS)
Russell, Richard A.; Waiss, Richard D.
1988-01-01
A study was conducted to identify the common support equipment and Space Station interface requirements for the IOC (initial operating capabilities) model technology experiments. In particular, each principal investigator for the proposed model technology experiment was contacted and visited for technical understanding and support for the generation of the detailed technical backup data required for completion of this study. Based on the data generated, a strong case can be made for a dedicated technology experiment command and control work station consisting of a command keyboard, cathode ray tube, data processing and storage, and an alert/annunciator panel located in the pressurized laboratory.
A strawman SLR program plan for the 1990s
NASA Technical Reports Server (NTRS)
Degnan, John J.
1994-01-01
A series of programmatic and technical goals for the satellite laser ranging (SLR) network are presented. They are: (1) standardize the performance of the global SLR network; (2) improve the geographic distribution of stations; (3) reduce costs of field operations and data processing; (4) expand the 24 hour temporal coverage to better serve the growing constellation of satellites; (5) improve absolute range accuracy to 2 mm at key stations; (6) improve satellite force, radiative propagation, and station motion models and investigate alternative geodetic analysis techniques; (7) support technical intercomparison and the Terrestrial Reference Frame through global collocations; (8) investigate potential synergisms between GPS and SLR.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kimmell, T.; Folga, S., Frey, G.; Molberg, J.
2001-05-02
This volume of the Technical Resource Document (TRD) for the ''Environmental Impact Statement (EIS) for the Design, Construction and Operation of One or More Pilot Test Facilities for Assembled Chemical Weapons Destruction Technologies at One or More Sites'' (PMACWA 2001g) pertains to the destruction of assembled chemical weapons (ACW) stored in the U.S. Army's unitary chemical stockpile at Blue Grass Army Depot (BGAD), located outside Richmond, Kentucky. This volume presents technical and process information on each of the destruction technologies applicable to treatment of the specific ACW stored at BGAD. The destruction technologies described are those that have been demonstratedmore » as part of the Assembled Chemical Weapons Assessment (ACWA) selection process (see Volume 1).« less
NASA Technical Reports Server (NTRS)
Fargion, Giulietta S.; McClain, Charles R.
2002-01-01
The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project. The SIMBIOS Science Team Principal Investigators' (PIs) original contributions to this report are in chapters four and above. The purpose of these contributions is to describe the current research status of the SIMBIOS-NRA-96 funded research. The contributions are published as submitted, with the exception of minor edits to correct obvious grammatical or clerical errors.
NASA Technical Reports Server (NTRS)
Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy
1996-01-01
This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual framework, functional description, and technical report server of the Scientific and Technical Information (STI) Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware. and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices consist of (A) the STI EDD Project Plan, (B) Team members, (C) Phasing Schedules, (D) Accessing On-line Reports, and (E) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desk top publishing systems, and technical report servers, to be able to provide to NASA's engineers, researchers, scientists, and external users, the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.
A new generation of real-time DOS technology for mission-oriented system integration and operation
NASA Technical Reports Server (NTRS)
Jensen, E. Douglas
1988-01-01
Information is given on system integration and operation (SIO) requirements and a new generation of technical approaches for SIO. Real-time, distribution, survivability, and adaptability requirements and technical approaches are covered. An Alpha operating system program management overview is outlined.
WTS-4 system verification unit for wind/hydroelectric integration study
NASA Technical Reports Server (NTRS)
Watts, A. W.
1982-01-01
The Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.
Development of a cultural heritage object BIM model
NASA Astrophysics Data System (ADS)
Braila, Natalya; Vakhrusheva, Svetlana; Martynenko, Elena; Kisel, Tatyana
2017-10-01
The BIM technology during her creation has been aimed, first of all, at design and construction branch, but its application in the field of studying and operation of architectural heritage can essentially change and transfer this kind of activity to new qualitative level. The question of effective introduction of BIM technologies at the solution of administrative questions of operation and development of monuments of architecture is considered in article. Creation of the information model of the building object of cultural heritage including a full complex of information on an object is offered: historical and archival, legal, technical, administrative, etc. The 3D model of an object of cultural heritage with color marking of elements on degree of wear and a first priority of carrying out repair will become one of components of model. This model will allow to estimate visually technical condition of the building in general and to gain general idea about scales of necessary repair and construction actions that promotes improvement of quality of operation of an object, and also simplifies and accelerates processing of information and in need of a memorial building assessment as subject to investment.
NASA Astrophysics Data System (ADS)
Soraya, N. W.; El Hadi, R. M.; Chumaidiyah, E.; Tripiawan, W.
2017-12-01
Conventional drying process is constrained by weather (cloudy / rainy), and requires wide drying area, and provides low-quality product. Multi-function dual energy oven is the appropriate technology to solve these problems. The oven uses solar thermal or gas heat for drying various type of products, including tapioca crackers. Investment analysis in technical, operational, and financial aspects show that the multi-function dual energy oven is feasible to be implemented for small medium enterprise (SME) processing tapioca crackers.
EOS image data processing system definition study
NASA Technical Reports Server (NTRS)
Gilbert, J.; Honikman, T.; Mcmahon, E.; Miller, E.; Pietrzak, L.; Yorsz, W.
1973-01-01
The Image Processing System (IPS) requirements and configuration are defined for NASA-sponsored advanced technology Earth Observatory System (EOS). The scope included investigation and definition of IPS operational, functional, and product requirements considering overall system constraints and interfaces (sensor, etc.) The scope also included investigation of the technical feasibility and definition of a point design reflecting system requirements. The design phase required a survey of present and projected technology related to general and special-purpose processors, high-density digital tape recorders, and image recorders.
Eddy current X-Y scanner system
NASA Technical Reports Server (NTRS)
Kurtz, G. W.
1983-01-01
The Nondestructive Evaluation Branch of the Materials and Processes Laboratory became aware of a need for a miniature, portable X-Y scanner capable of performing eddy current or other nondestructive testing scanning operations such as ultrasonic, or small areas of flat plate. The technical description and operational theory of the X-Y scanner system designed and built to fulfill this need are covered. The scanner was given limited testing and performs according to its design intent, which is to scan flat plate areas of approximately 412 sq cm (64 sq in) during each complete cycle of scanning.
Engineering Infrastructures: Problems of Safety and Security in the Russian Federation
NASA Astrophysics Data System (ADS)
Makhutov, Nikolay A.; Reznikov, Dmitry O.; Petrov, Vitaly P.
Modern society cannot exist without stable and reliable engineering infrastructures (EI), whose operation is vital for any national economy. These infrastructures include energy, transportation, water and gas supply systems, telecommunication and cyber systems, etc. Their performance is commensurate with storing and processing huge amounts of information, energy and hazardous substances. Ageing infrastructures are deteriorating — with operating conditions declining from normal to emergency and catastrophic. The complexity of engineering infrastructures and their interdependence with other technical systems makes them vulnerable to emergency situations triggered by natural and manmade catastrophes or terrorist attacks.
DOE Office of Scientific and Technical Information (OSTI.GOV)
St. Germain, Shawn W.; Farris, Ronald K.; Whaley, April M.
This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The purpose of this research is to improve management of nuclear powermore » plant (NPP) outages through the development of an advanced outage control center (AOCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This technical report for industry implementation outlines methods and considerations for the establishment of an AOCC. This report provides a process for implementation of a change management plan, evaluation of current outage processes, the selection of technology, and guidance for the implementation of the selected technology. Methods are presented for both adoption of technologies within an existing OCC and for a complete OCC replacement, including human factors considerations for OCC design and setup.« less
Oxford NOTECHS II: a modified theatre team non-technical skills scoring system.
Robertson, Eleanor R; Hadi, Mohammed; Morgan, Lauren J; Pickering, Sharon P; Collins, Gary; New, Steve; Griffin, Damian; Griffin, Damien; McCulloch, Peter; Catchpole, Ken C
2014-01-01
We previously developed and validated the Oxford NOTECHS rating system for evaluating the non-technical skills of an entire operating theatre team. Experience with the scale identified the need for greater discrimination between levels of performance within the normal range. We report here the development of a modified scale (Oxford NOTECHS II) to facilitate this. The new measure uses an eight-point instead of a four point scale to measure each dimension of non-technical skills, and begins with a default rating of 6 for each element. We evaluated this new scale in 297 operations at five NHS sites in four surgical specialities. Measures of theatre process reliability (glitch count) and compliance with the WHO surgical safety checklist were scored contemporaneously, and relationships with NOTECHS II scores explored. Mean team Oxford NOTECHS II scores was 73.39 (range 37-92). The means for surgical, anaesthetic and nursing sub-teams were 24.61 (IQR 23, 27); 24.22 (IQR 23, 26) and 24.55 (IQR 23, 26). Oxford NOTECHS II showed good inter-rater reliability between human factors and clinical observers in each of the four domains. Teams with high WHO compliance had higher mean Oxford NOTECHS II scores (74.5) than those with low compliance (71.1) (p = 0.010). We observed only a weak correlation between Oxford NOTECHS II scores and glitch count; r = -0.26 (95% CI -0.36 to -0.15). Oxford NOTECHS II scores did not vary significantly between 5 different hospital sites, but a significant difference was seen between specialities (p = 0.001). Oxford NOTECHS II provides good discrimination between teams while retaining reliability and correlation with other measures of teamwork performance, and is not confounded by technical performance. It is therefore suitable for combined use with a technical performance scale to provide a global description of operating theatre team performance.
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...
NASA Astrophysics Data System (ADS)
Yagi, Yukio; Takahashi, Kaei
The purpose of this report is to describe how the activities for managing technical information has been and is now being conducted by the Engineering department of Nippon Kokan Corp. In addition, as a practical example of database generation promoted by the department, this book gives whole aspects of the NEW-KOTIS (background of its development, history, features, functional details, control and operation method, use in search operations, and so forth). The NEW-KOTIS (3rd-term system) is an "in-house technical information database system," which started its operation on May, 1987. This database system now contains approximately 65,000 information items (research reports, investigation reports, technical reports, etc.) generated within the company, and this information is available to anyone in any department through the network connecting all the company's structures.
ERIC Educational Resources Information Center
Bailey, Alison L.; Huang, Becky H.; Shin, Hye Won; Farnsworth, Tim; Butler, Frances A.
2007-01-01
Within an evidentiary framework for operationally defining academic English language proficiency (AELP), linguistic analyses of standards, classroom discourse, and textbooks have led to specifications for assessment of AELP. The test development process described here is novel due to the emphasis on using linguistic profiles to inform the …
ERIC Educational Resources Information Center
Goetz, Ernest T.; And Others
Two experiments using the same design and subjects drawn from the same populations tested two accounts of schema-directed text processing, the selective attention hypothesis that suggests readers identify text elements as important or unimportant on the basis of an engaged, operative, or subsuming schema; and the slot-filling hypothesis that…
Automatic Requirements Specification Extraction from Natural Language (ARSENAL)
2014-10-01
designers, implementers) involved in the design of software systems. However, natural language descriptions can be informal, incomplete, imprecise...communication of technical descriptions between the various stakeholders (e.g., customers, designers, imple- menters) involved in the design of software systems...the accuracy of the natural language processing stage, the degree of automation, and robustness to noise. 1 2 Introduction Software systems operate in
M.E.T.R.O.-Apex Gaming Simulation, Volume 28 (OS/360 Version).
ERIC Educational Resources Information Center
Michigan Univ., Ann Arbor. Environmental Simulation Lab.
Operator's instructions and technical support materials needed for processing the M.E.T.R.O.-APEX (Air Pollution Exercise) game decisions on an IBM 360 computer are compiled in this volume. M.E.T.R.O.-APEX is a computerized college and professional level "real world" simulation of a community with urban and rural problems, industrial activities,…
2016-12-10
will be 2 x failure (critical) depth. G. INSPECTION REQUIREMENTS Either the No- Bake sand or Investment process is selected based on which... Bake sand and the Investment Casting Handbook by the Investment Casting Institute has the tolerance values for investment castings. Typically there
DOE Office of Scientific and Technical Information (OSTI.GOV)
Skibo, A.
SRNL has considerable experience in designing, engineering, and operating systems for removing iodine-129 (I-129) and ruthenium-106 (Ru-106) from waste streams that are directly analogous to the Advanced Liquid Processing System (ALPS) waste streams. SRNL proposes to provide the technical background and design and engineering support for an improved I-129 and Ru-106 removal system for application to ALPS on the Fukushima Daiichi Nuclear Power Station (NPS).
DEVELOPMENT OF OPERATIONAL CONCEPTS FOR ADVANCED SMRs: THE ROLE OF COGNITIVE SYSTEMS ENGINEERING
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jacques Hugo; David Gertman
Advanced small modular reactors (AdvSMRs) will use advanced digital instrumentation and control systems, and make greater use of automation. These advances not only pose technical and operational challenges, but will inevitably have an effect on the operating and maintenance (O&M) cost of new plants. However, there is much uncertainty about the impact of AdvSMR designs on operational and human factors considerations, such as workload, situation awareness, human reliability, staffing levels, and the appropriate allocation of functions between the crew and various automated plant systems. Existing human factors and systems engineering design standards and methodologies are not current in terms ofmore » human interaction requirements for dynamic automated systems and are no longer suitable for the analysis of evolving operational concepts. New models and guidance for operational concepts for complex socio-technical systems need to adopt a state-of-the-art approach such as Cognitive Systems Engineering (CSE) that gives due consideration to the role of personnel. This approach we report on helps to identify and evaluate human challenges related to non-traditional concepts of operations. A framework - defining operational strategies was developed based on the operational analysis of Argonne National Laboratory’s Experimental Breeder Reactor-II (EBR-II), a small (20MWe) sodium-cooled reactor that was successfully operated for thirty years. Insights from the application of the systematic application of the methodology and its utility are reviewed and arguments for the formal adoption of CSE as a value-added part of the Systems Engineering process are presented.« less
Commercialization of New Beam Applications
NASA Astrophysics Data System (ADS)
McKeown, Joseph
1996-05-01
The commercialization of electron processing applications is driven by demonstrated technical advantages over current practice. Mature and reliable accelerator technology has permitted more consistent product quality and the development of new processes. However, the barriers to commercial adoption are often not amenable to solution within the laboratory alone. Aspects of the base accelerator technology, plant engineering, production, project management, financing, regulatory control, product throughput and plant operational efficiency all contribute to the business risk. Experiences in building three 10 MeV, 50 kW, IMPELA electron accelerators at approximately 8 M each and achieving cumulative operational availability greater than 98% in commercial environments have identified key parameters defining those aspects. The allowed ranges of these parameters to generate the 1.5 M annual revenue that is typically necessary to support outlays of this scale are presented. Such data have been used in proposals to displace expensive chemicals in the viscose industry, sterilize sewage sludge, detoxify chemically contaminated soils and build radiation service centers for a diversity of applications. The proposals face stiff competition from traditional chemical methods. Quantitative technical and business details of these activities are provided and an attempt is made to establish realistic expectations for the exploitation of electron beam technologies in emerging applications.
Life Cycle Systems Engineering Approach to NASA's 2nd Generation Reusable Launch Vehicle
NASA Technical Reports Server (NTRS)
Thomas, Dale; Smith, Charles; Safie, Fayssal; Kittredge, Sheryl
2002-01-01
The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd- generation system by 2 orders of magnitude - equivalent to a crew risk of 1 -in- 10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. Given a candidate architecture that possesses credible physical processes and realistic technology assumptions, the next set of analyses address the system's functionality across the spread of operational scenarios characterized by the design reference missions. The safety/reliability and cost/economics associated with operating the system will also be modeled and analyzed to answer the questions "How safe is it?" and "How much will it cost to acquire and operate?" The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.
Projects for People: An International Exchange Focused on Drinking Water Quality in Rural Peru
NASA Astrophysics Data System (ADS)
Weathers, T. S.; Tarazona Vasquez, F.; Bailey, E.; Duong, V.; Gonzales Vera, R.; LaPorte, D.; Rojas Cala, B.; Torres Atencia, S.; Vasquez Auqui, J.
2016-12-01
The integration of human-centered design with technical engineering in a classroom setting can be challenging but immensely rewarding if coupled with a community-focused experience. Undergraduate students participated in an international exchange to address drinking water quality in the community of Huamancaca, located in the Junin region of Peru. Technical research and experimentation often comes easily to students in undergraduate engineering programs, however, implementation within a community requires a social license to operate. The objectives of this study were to address the technical challenges of designing a sustainable and effective water filtration system while also ensuring community support and education, coupled with user ownership of the process. In tandem with filter media experimentation with biochar and activated carbon produced using locally available agricultural waste from potatoes and carrots, we visited the people of Huamancaca to understand their needs and concerns. This direct communication with the community was invaluable; we observed that many of the residents' water quality problems could be solved with education. For example, proper sanitation techniques and appropriate addition of bleach or sufficient boiling time may make up for inconsistent water quality provided by the local distribution system. An education plan may also be developed for water treatment plant operators covering chlorine dosage for effective residual treatment within the distribution network in addition to filtration. Upon site visitation and sample collection, we realized that open communication with city officials, operators, business owners, and residents in both technical and social settings is essential for continued collaboration within this community. Solving a tangible problem or designing a product that can be effectively adopted is not a concept that is rigorously addressed in undergraduate education, however the setbacks, challenges, and triumphs experienced when interacting with a community can provide valuable lessons for career development.
NASA Astrophysics Data System (ADS)
Arakelyan, E. K.; Andryushin, A. V.; Burtsev, S. Y.; Andryushin, K. A.
2017-11-01
The analysis of technical and parametric constraints on the adjustment range of highpower CCP and recommended technological solutions in the technical literature for their elimination. Established that in the conditions of toughening the requirements for economy, reliability and maneuverability on the part of the system operator with the participation of CCP in control the frequency and power in the power system, existing methods do not ensure the fulfillment of these requirements. The current situation in the energy sector — the lack of highly manoeuvrable power equipment leads to the need participate in control of power consumption diagrams for all types of power plants, including CCP, although initially they were intended primarily for basic loads. Large-scale research conducted at the department of Automated control systems of technological processes, showed the possibility of a significant expansion of the adjustment range of CCP when it operating in the condensing mode and in the heating mode. The report presents the main results of these research for example the CCP-450 and CCP-450T. Various technological solutions are considered: when CCP in the condensation mode — the use of bypass steam distribution schemes, the transfer of a part of the steam turbine into a low-steam mode; when CCP operation in the heating mode — bypass steam distribution and the transfer CCP to gas turbine unit — power heating plants mode with the transfer the steam turbine to the motor mode. Data on the evaluation of the technical and economic feasibility of the proposed innovative technological solutions are presented in comparison with the methods used to solve this problem, which are used in practice, such as passing through the failures of the electric load graphs by transferring the CCP to the mode of operation with incomplete equipment. When comparing, both the economics, and the maneuverability and reliability of the equipment are considered.
Dynamics of Postcombustion CO2 Capture Plants: Modeling, Validation, and Case Study
2017-01-01
The capture of CO2 from power plant flue gases provides an opportunity to mitigate emissions that are harmful to the global climate. While the process of CO2 capture using an aqueous amine solution is well-known from experience in other technical sectors (e.g., acid gas removal in the gas processing industry), its operation combined with a power plant still needs investigation because in this case, the interaction with power plants that are increasingly operated dynamically poses control challenges. This article presents the dynamic modeling of CO2 capture plants followed by a detailed validation using transient measurements recorded from the pilot plant operated at the Maasvlakte power station in the Netherlands. The model predictions are in good agreement with the experimental data related to the transient changes of the main process variables such as flow rate, CO2 concentrations, temperatures, and solvent loading. The validated model was used to study the effects of fast power plant transients on the capture plant operation. A relevant result of this work is that an integrated CO2 capture plant might enable more dynamic operation of retrofitted fossil fuel power plants because the large amount of steam needed by the capture process can be diverted rapidly to and from the power plant. PMID:28413256
A CHARACTERIZATION AND EVALUATION OF COAL LIQUEFACTION PROCESS STREAMS
DOE Office of Scientific and Technical Information (OSTI.GOV)
G.A. Robbins; R.A. Winschel; S.D. Brandes
This is the first Annual Technical Report of activities under DOE Contract No. DE-AC22-94PC93054. Activities from the first three quarters of the fiscal 1998 year were reported previously as Quarterly Technical Progress Reports (DOE/PC93054-57, DOE/PC93054-61, and DOE/PC93054-66). Activities for the period July 1 through September 30, 1998, are reported here. This report describes CONSOL's characterization of process-derived samples obtained from HTI Run PB-08. These samples were derived from operations with Black Thunder Mine Wyoming subbituminous coal, simulated mixed waste plastics, and pyrolysis oils derived from waste plastics and waste tires. Comparison of characteristics among the PB-08 samples was made tomore » ascertain the effects of feed composition changes. A comparison also was made to samples from a previous test (Run PB-06) made in the same processing unit, with Black Thunder Mine coal, and in one run condition with co-fed mixed plastics.« less
Human Exploration Framework Team: Strategy and Status
NASA Technical Reports Server (NTRS)
Muirhead, Brian K.; Sherwood, Brent; Olson, John
2011-01-01
Human Exploration Framework Team (HEFT) was formulated to create a decision framework for human space exploration that drives out the knowledge, capabilities and infrastructure NASA needs to send people to explore multiple destinations in the Solar System in an efficient, sustainable way. The specific goal is to generate an initial architecture that can evolve into a long term, enterprise-wide architecture that is the basis for a robust human space flight enterprise. This paper will discuss the initial HEFT activity which focused on starting up the cross-agency team, getting it functioning, developing a comprehensive development and analysis process and conducting multiple iterations of the process. The outcome of this process will be discussed including initial analysis of capabilities and missions for at least two decades, keeping Mars as the ultimate destination. Details are provided on strategies that span a broad technical and programmatic trade space, are analyzed against design reference missions and evaluated against a broad set of figures of merit including affordability, operational complexity, and technical and programmatic risk.
INDOT Technical Training Plan : Appendix B
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix M
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix P
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix F
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix H
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix E
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix O
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix J
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix L
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix A
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix D
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix K
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix G
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix I
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix N
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix C
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
Non-technical skills of the operating theatre scrub nurse: literature review.
Mitchell, Lucy; Flin, Rhona
2008-07-01
This paper is a report of a review to identify the non-technical (cognitive and social) skills used by scrub nurses. Recognition that failures in non-technical skills contributed to accidents in high-risk industries led to the development of research programmes to study the role of cognition and social interactions in operational safety. Recently, psychological research in operating theatres has revealed the importance of non-technical skills in safe and efficient performance. Most of the studies to date have focused on anaesthetists and surgeons. On-line sources and university library catalogues, publications of the Association for Perioperative Practice, National Association of Theatre Nurses and Association of Peri-Operative Registered Nurses were searched in 2007. Studies were included in the review if they presented data from scrub nurses on one or more of their non-technical skills. These findings were examined in relation to an existing medical non-technical skills framework with categories of communication, teamwork, leadership, situation awareness and decision-making. Of 424 publications retrieved, 13 were reviewed in detail. Ten concerned communication and eight of those also had data on teamwork. In 11 papers teamwork was examined, and one focused on nurses' situation awareness, teamwork and communication. None of the papers we reviewed examined leadership or decision-making by scrub nurses. Further work is needed to identify formally the non-technical skills which are important to the role of scrub nurse and then to design training in the identified non-technical skills during the education and development of scrub nurses.
Mroczkowski, Edward; Wielgosz, Romuald
2004-01-01
The first step to microsurgery is getting to know about technical principle and operation of the surgical microscopes. Special attention is paid to those modules and items of microscopes, which surgeon use most frequently, such as objectives, binocular tubes, eyepieces.
NASA Technical Reports Server (NTRS)
Palo, Thomas E.
2007-01-01
The safety review process for NASA spacecraft flown on Expendable Launch Vehicles (ELVs) has been guided by NASA-STD 8719.8, Expendable Launch Vehicle Payload Safety Review Process Standard. The standard focused primarily on the safety approval required to begin pre-launch processing at the launch site. Subsequent changes in the contractual, technical, and operational aspects of payload processing, combined with lessons-learned supported a need for the reassessment of the standard. This has resulted in the formation of a NASA ELV Payload Safety Program. This program has been working to address the programmatic issues that will enhance and supplement the existing process, while continuing to ensure the safety of ELV payload activities.
Research on information security system of waste terminal disposal process
NASA Astrophysics Data System (ADS)
Zhou, Chao; Wang, Ziying; Guo, Jing; Guo, Yajuan; Huang, Wei
2017-05-01
Informatization has penetrated the whole process of production and operation of electric power enterprises. It not only improves the level of lean management and quality service, but also faces severe security risks. The internal network terminal is the outermost layer and the most vulnerable node of the inner network boundary. It has the characteristics of wide distribution, long depth and large quantity. The user and operation and maintenance personnel technical level and security awareness is uneven, which led to the internal network terminal is the weakest link in information security. Through the implementation of security of management, technology and physics, we should establish an internal network terminal security protection system, so as to fully protect the internal network terminal information security.
Quantum information processing with a travelling wave of light
NASA Astrophysics Data System (ADS)
Serikawa, Takahiro; Shiozawa, Yu; Ogawa, Hisashi; Takanashi, Naoto; Takeda, Shuntaro; Yoshikawa, Jun-ichi; Furusawa, Akira
2018-02-01
We exploit quantum information processing on a traveling wave of light, expecting emancipation from thermal noise, easy coupling to fiber communication, and potentially high operation speed. Although optical memories are technically challenging, we have an alternative approach to apply multi-step operations on traveling light, that is, continuous-variable one-way computation. So far our achievement includes generation of a one-million-mode entangled chain in time-domain, mode engineering of nonlinear resource states, and real-time nonlinear feedforward. Although they are implemented with free space optics, we are also investigating photonic integration and performed quantum teleportation with a passive liner waveguide chip as a demonstration of entangling, measurement, and feedforward. We also suggest a loop-based architecture as another model of continuous-variable computing.
Mentoring SFRM: A New Approach to International Space Station Flight Control Training
NASA Technical Reports Server (NTRS)
Huning, Therese; Barshi, Immanuel; Schmidt, Lacey
2009-01-01
The Mission Operations Directorate (MOD) of the Johnson Space Center is responsible for providing continuous operations support for the International Space Station (ISS). Operations support requires flight controllers who are skilled in team performance as well as the technical operations of the ISS. Space Flight Resource Management (SFRM), a NASA adapted variant of Crew Resource Management (CRM), is the competency model used in the MOD. ISS flight controller certification has evolved to include a balanced focus on development of SFRM and technical expertise. The latest challenge the MOD faces is how to certify an ISS flight controller (Operator) to a basic level of effectiveness in 1 year. SFRM training uses a twopronged approach to expediting operator certification: 1) imbed SFRM skills training into all Operator technical training and 2) use senior flight controllers as mentors. This paper focuses on how the MOD uses senior flight controllers as mentors to train SFRM skills.
Final technical report. In-situ FT-IR monitoring of a black liquor recovery boiler
DOE Office of Scientific and Technical Information (OSTI.GOV)
James Markham; Joseph Cosgrove; David Marran
1999-05-31
This project developed and tested advanced Fourier transform infrared (FT-IR) instruments for process monitoring of black liquor recovery boilers. The state-of-the-art FT-IR instruments successfully operated in the harsh environment of a black liquor recovery boiler and provided a wealth of real-time process information. Concentrations of multiple gas species were simultaneously monitored in-situ across the combustion flow of the boiler and extractively at the stack. Sensitivity to changes of particulate fume and carryover levels in the process flow were also demonstrated. Boiler set-up and operation is a complex balance of conditions that influence the chemical and physical processes in the combustionmore » flow. Operating parameters include black liquor flow rate, liquor temperature, nozzle pressure, primary air, secondary air, tertiary air, boiler excess oxygen and others. The in-process information provided by the FT-IR monitors can be used as a boiler control tool since species indicative of combustion efficiency (carbon monoxide, methane) and pollutant emissions (sulfur dioxide, hydrochloric acid and fume) were monitored in real-time and observed to fluctuate as operating conditions were varied. A high priority need of the U.S. industrial boiler market is improved measurement and control technology. The sensor technology demonstrated in this project is applicable to the need of industry.« less
D'souza, Melroy A; Singh, Kailash; Hawaldar, Rohini V; Shukla, Parul J; Shrikhande, Shailesh V
2010-08-01
Few studies describing the use of stapling devices for uncinate process division during pancreaticoduodenectomy (PD) have data regarding outcomes. Our aim is to discuss our technique and the peri-operative outcomes with the use of the linear vascular stapler for division of the uncinate process during PD. 19 consecutive patients who underwent stapler division of the uncinate process ('stapler' group) were compared to 20 consecutive patients operated without stapler ('no-stapler' group). The overall surgical morbidity in the no-stapler group was 25% (5/20) and 31.6% (6/19) in the stapler group (p = 0.731). The mean blood loss in the no-stapler group was 1,077.5 +/- 594 ml compared to 778 +/- 302 ml in the stapler group (p = 0.113). The mean operative duration was 498 +/- 105 min in the no-stapler group and 490 +/- 60 min in the stapler group (p = 0.773). The average number of lymph nodes retrieved was 6.1 +/- 3 in the no-stapler group versus 5.9 +/- 4 in the stapler group (p = 0.627). Neither group had positive resection margins. Stapler division of the uncinate process for selected periampullary tumours compares well with the conventional method, has comparable peri-operative outcomes without compromising oncological radicality and has the potential to simplify uncinate resection.
NASA Technical Reports Server (NTRS)
1992-01-01
The Space Station Furnace Facility (SSFF) is a modular facility for materials research in the microgravity environment of the Space Station Freedom (SSF). The SSFF is designed for crystal growth and solidification research in the fields of electronic and photonic materials, metals and alloys, and glasses and ceramics and will allow for experimental determination of the role of gravitational forces in the solidification process. The facility will provide a capability for basic scientific research and will evaluate the commercial viability of low-gravity processing of selected technologically important materials. The facility is designed to support a complement of furnace modules as outlined in the Science Capabilities Requirements Document (SCRD). The SSFF is a three rack facility that provides the functions, interfaces, and equipment necessary for the processing of the furnaces and consists of two main parts: the SSFF Core Rack and the two Experiment Racks. The facility is designed to accommodate two experimenter-provided furnace modules housed within the two experiment racks, and is designed to operate these two furnace modules simultaneously. The SCRD specifies a wide range of furnace requirements and serves as the basis for the SSFF conceptual design. SSFF will support automated processing during the man-tended operations and is also designed for crew interface during the permanently manned configuration. The facility is modular in design and facilitates changes as required, so the SSFF is adept to modifications, maintenance, reconfiguration, and technology evolution.
Independent technical review, handbook
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction,more » and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.« less
Brain-Mind Operational Architectonics Imaging: Technical and Methodological Aspects
Fingelkurts, Andrew A; Fingelkurts, Alexander A
2008-01-01
This review paper deals with methodological and technical foundations of the Operational Architectonics framework of brain and mind functioning. This theory provides a framework for mapping and understanding important aspects of the brain mechanisms that constitute perception, cognition, and eventually consciousness. The methods utilized within Operational Architectonics framework allow analyzing with an incredible detail the operational behavior of local neuronal assemblies and their joint activity in the form of unified and metastable operational modules, which constitute the whole hierarchy of brain operations, operations of cognition and phenomenal consciousness. PMID:19526071
Prayon process for wet acid purification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davister, A.; Peeterbroeck, M.
Described is a process developed in Belgium which enables the upgrading technical phosphoric acid to feed and food grades. After laboratory and pilot tests, Prayon developed and patented a solvent extraction process using a mixture of di-isopropyl ether and tributyl phosphate as solvent. The purified phosphoric acid obtained complies with the quality requirements of the market and can be used for metal treatments, in the manufacture of pure phosphates, for cattle feed, by the fermentation industry, for beverages, etc. Among the advantages of this process are its simplicity of operation, its low power consumption, and minimal environmental pollution. Extensive technologicalmore » data are given.« less
Digital imaging technology assessment: Digital document storage project
NASA Technical Reports Server (NTRS)
1989-01-01
An ongoing technical assessment and requirements definition project is examining the potential role of digital imaging technology at NASA's STI facility. The focus is on the basic components of imaging technology in today's marketplace as well as the components anticipated in the near future. Presented is a requirement specification for a prototype project, an initial examination of current image processing at the STI facility, and an initial summary of image processing projects at other sites. Operational imaging systems incorporate scanners, optical storage, high resolution monitors, processing nodes, magnetic storage, jukeboxes, specialized boards, optical character recognition gear, pixel addressable printers, communications, and complex software processes.
Theory of Constraints for Services: Past, Present, and Future
NASA Astrophysics Data System (ADS)
Ricketts, John A.
Theory of constraints (TOC) is a thinking process and a set of management applications based on principles that run counter to conventional wisdom. TOC is best known in the manufacturing and distribution sectors where it originated. Awareness is growing in some service sectors, such as Health Care. And it's been adopted in some high-tech industries, such as Computer Software. Until recently, however, TOC was barely known in the Professional, Scientific, and Technical Services (PSTS) sector. Professional services include law, accounting, and consulting. Scientific services include research and development. And Technical services include development, operation, and support of various technologies. The main reason TOC took longer to reach PSTS is it's much harder to apply TOC principles when services are highly customized. Nevertheless, with the management applications described in this chapter, TOC has been successfully adapted for PSTS. Those applications cover management of resources, projects, processes, and finances.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-03-01
This report covers the H-Coal Pilot Plant facility located in Catlettsburg, Kentucky. The authorization for this project was under DOE contract No. DE-AC05-78ET11052, formally ET-78-C-01-3224. Badger Plants, Inc. carried out the construction management of this facility. The estimated total cost is $147,265,013. A brief process/technical description of the Pilot Plant covers subjects such as objectives, capacity, expected life, etc. A brief technical description of each processing unit, including its purpose in the overall operations of the plant is given. A general description of the organizational history of the project is given. Current overall organization and a description of the responsibilitiesmore » of each participant are included. Badger Plant's organization at manager level is shown.« less
2011-12-01
systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical
Automatic Control of the Concrete Mixture Homogeneity in Cycling Mixers
NASA Astrophysics Data System (ADS)
Anatoly Fedorovich, Tikhonov; Drozdov, Anatoly
2018-03-01
The article describes the factors affecting the concrete mixture quality related to the moisture content of aggregates, since the effectiveness of the concrete mixture production is largely determined by the availability of quality management tools at all stages of the technological process. It is established that the unaccounted moisture of aggregates adversely affects the concrete mixture homogeneity and, accordingly, the strength of building structures. A new control method and the automatic control system of the concrete mixture homogeneity in the technological process of mixing components have been proposed, since the tasks of providing a concrete mixture are performed by the automatic control system of processing kneading-and-mixing machinery with operational automatic control of homogeneity. Theoretical underpinnings of the control of the mixture homogeneity are presented, which are related to a change in the frequency of vibrodynamic vibrations of the mixer body. The structure of the technical means of the automatic control system for regulating the supply of water is determined depending on the change in the concrete mixture homogeneity during the continuous mixing of components. The following technical means for establishing automatic control have been chosen: vibro-acoustic sensors, remote terminal units, electropneumatic control actuators, etc. To identify the quality indicator of automatic control, the system offers a structure flowchart with transfer functions that determine the ACS operation in transient dynamic mode.
Deep Space Network (DSN), Network Operations Control Center (NOCC) computer-human interfaces
NASA Technical Reports Server (NTRS)
Ellman, Alvin; Carlton, Magdi
1993-01-01
The technical challenges, engineering solutions, and results of the NOCC computer-human interface design are presented. The use-centered design process was as follows: determine the design criteria for user concerns; assess the impact of design decisions on the users; and determine the technical aspects of the implementation (tools, platforms, etc.). The NOCC hardware architecture is illustrated. A graphical model of the DSN that represented the hierarchical structure of the data was constructed. The DSN spacecraft summary display is shown. Navigation from top to bottom is accomplished by clicking the appropriate button for the element about which the user desires more detail. The telemetry summary display and the antenna color decision table are also shown.
NASA Astrophysics Data System (ADS)
Black, Stephen T.; Eshleman, Wally
1997-01-01
This paper describes the VentureStar™ SSTO RLV and X-33 operations concepts. Applications of advanced technologies, automated ground support systems, advanced aircraft and launch vehicle lessons learned have been integrated to develop a streamlined vehicle and mission processing concept necessary to meet the goals of a commercial SSTO RLV. These concepts will be validated by the X-33 flight test program where financial and technical risk mitigation are required. The X-33 flight test program totally demonstrates the vehicle performance, technology, and efficient ground operations at the lowest possible cost. The Skunk Work's test program approach and test site proximity to the production plant are keys. The X-33 integrated flight and ground test program incrementally expands the knowledge base of the overall system allowing minimum risk progression to the next flight test program milestone. Subsequent X-33 turnaround processing flows will be performed with an aircraft operations philosophy. The differences will be based on research and development, component reliability and flight test requirements.
Truck side guard technical overview : safety and operational considerations
DOT National Transportation Integrated Search
2015-04-23
This technical overview provides safety and operational considerations for truck side guards. Truck side guards are designed to keep pedestrians, bicyclists, and motorcyclists - known as vulnerable road users (VRUs) from being run over by a large tru...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The goal of the US Department of Energy (DOE) Underground Coal Conversion (UCC) program is to develop the technology to produce clean fuels from coal deposits that are unsuitable for commercial exploitation by conventional mining techniques. The highest priority is to develop and demonstrate, in conjunction with industry, a commercially feasible process for underground gasification of low-rank coal in the 1985 to 1987 time period. The DOE program has stimulated industry interest and activity in developing UCC technology. Several major energy corporations and utilities have invested private funds in UCC research and development (R and D) projects. Results of themore » program to date indicate that, while UCC is technically feasible, it still contains some process unknowns, environmental risks, and economic risks that require R and D. In order to contribute to the national energy goals, a strong DOE program that incorporates maximum industry involvement is planned. The program's strategy is to remove the high-risk elements of UCC by resolving technical, environmental, and economic uncertainties. This will enable industry to assume responsibility for commercialization of the technology. Thus, the elements of the program have been designed to: provide detailed design and operational data that industry can scale-up with confidence; provide accurate and complete cost estimates that can be scaled-up and will allow comparison with alternative processes; provide detailed environmental impact and control data to allow industry to implement projects that will meet applicable standards; verify the reliability of continuous operation of UCC processes; and show that UCC processes have the flexibility to meet a variety of commercial needs.« less
Control of innovation activity in a competitive metallurgical business
NASA Astrophysics Data System (ADS)
Bogdanov, S. V.
2010-12-01
Certain competitive advantages of a manufacturer on a goods market can be provided if one creates conditions for bifurcation development of an innovation process in metallurgical business under conditions of market uncertainty of a demand for goods of a specified consumer quality and determines the technical-and-economic versions of stable operation of a production system for performing orders of metal product consumers.
ERIC Educational Resources Information Center
Kershner, Lois M.
The amount of change resulting from the implementation of the Bibliographic Automation of Large Library Operations using a Time-sharing System (BALLOTS) is analyzed, in terms of (1) physical room arrangement, (2) work procedure, and (3) organizational structure. Also considered is the factor of amount of time the new system has been in use.…
Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challange
NASA Technical Reports Server (NTRS)
Dubon, Lydia P.
2006-01-01
The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), responsible for project management and flight operations; Orbital Sciences Corporation (OSC), spacecraft builder and responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), responsible for science planning and operations. As a cost-capped mission, one of Dawn s implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL s ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL s GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project s commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to an overall systems engineering process and fundamental systems engineering practices: decomposition of the project request into manageable requirements; definition of a structured yet flexible development process; integration of multiple ground disciplines and experts into a focused team effort; in-process risk management; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.
Michinov, Estelle; Jamet, Eric; Dodeler, Virginie; Haegelen, Claire; Jannin, Pierre
2014-10-01
The management of non-technical skills is a major factor affecting teamwork quality and patient safety. This article presents a behavioural marker system for assessing neurosurgical non-technical skills (BMS-NNTS). We tested the BMS during deep brain stimulation surgery. We developed the BMS in three stages. First, we drew up a provisional assessment tool based on the literature and observation tools developed for other surgical specialties. We then analysed videos made in an operating room (OR) during deep brain stimulation operations in order to ensure there were no significant omissions from the skills list. Finally, we used five videos of operations to identify the behavioural markers of non-technical skills in verbal communications. Analyses of more than six hours of observations revealed 3515 behaviours from which we determined the neurosurgeon's non-technical skills behaviour pattern. The neurosurgeon frequently engaged in explicit coordination, situation awareness and leadership behaviours. In addition, the neurosurgeon's behaviours differed according to the stage of the operation and the OR staff members with whom she was communicating. Our behavioural marker system provides a structured approach to assessing non-technical skills in the field of neurosurgery. It can also be transferred to other surgical specialties and used in surgeon training curricula. © 2014 John Wiley & Sons, Ltd.
Technical Subjects. Mathematics. Science. Curriculum RP-27.
ERIC Educational Resources Information Center
Ontario Dept. of Education, Toronto.
GRADES OR AGES: Grades 9-12. SUBJECT MATTER: Technical subjects and special mathematics and science courses for technical students. Technical subjects include air conditioning, auto mechanics, carpentry, drafting, applied electronics, masonry, painting, plumbing, service station operation, welding, and woodworking. ORGANIZATION AND PHYSICAL…
Beato, Marco; Jamil, Mikael; Devereux, Gavin
2018-06-01
The Video Tracking multiple cameras system (VTS) is a technology that records two-dimensional position data (x and y) at high sampling rates (over 25 Hz). The VTS is of great interest because it can record external load variables as well as collect technical and tactical parameters. Performance analysis is mainly focused on physical demands, yet less attention has been afforded to technical and tactical factors. Digital.Stadium® VTS is a performance analysis device widely used at national and international levels (i.e. Italian Serie A, Euro 2016) and the reliability evaluation of its technical tagging analysis (e.g. shots, passes, assists, set pieces) could be paramount for its application at elite level competitions, as well as in research studies. Two professional soccer teams, with 30 male players (age 23 ± 5 years, body mass 78.3 ± 6.9 kg, body height 1.81 ± 0.06 m), were monitored in the 2016 season during a friendly match and data analysis was performed immediately after the game ended. This process was then replicated a week later (4 operators conducted the data analysis in each week). This study reports a near perfect relationship between Match and its Replication. R2 coefficients (relationships between Match and Replication) were highly significant for each of the technical variables considered (p < 0.001). In particular, a high score of interclass correlation and a small coefficient of variation were reported. This study reports meaningless differences between Match and its Replication (intra-day reliability). We concluded that the semi-automatic process behind the Digital.Stadium® VTS was more than capable of recording technical tagging data accurately.
Understanding the LANDSAT market in developing countries
NASA Technical Reports Server (NTRS)
Willard, M. R.
1980-01-01
The constraints on the growth of the market which stem from the development process itself and from a country's technical, political, and institutional attributes were examined. Four competing factors guide the development of policy regarding an operational land remote sensing system and are summarized. The factors are: there is a need to boost U.S. experts in areas where the U.S. holds a technological lead; the need to develop user applications in developing countries on their terms coincides with foreign policy; developing countries desire to take control of their own development; and the U.S. government wants to enlist the participation of major companies in the management, operation, and ownership of the operational system.
Operating a petabyte class archive at ESO
NASA Astrophysics Data System (ADS)
Suchar, Dieter; Lockhart, John S.; Burrows, Andrew
2008-07-01
The challenges of setting up and operating a Petabyte Class Archive will be described in terms of computer systems within a complex Data Centre environment. The computer systems, including the ESO Primary and Secondary Archive and the associated computational environments such as relational databases will be explained. This encompasses the entire system project cycle, including the technical specifications, procurement process, equipment installation and all further operational phases. The ESO Data Centre construction and the complexity of managing the environment will be presented. Many factors had to be considered during the construction phase, such as power consumption, targeted cooling and the accumulated load on the building structure to enable the smooth running of a Petabyte class Archive.
Streamlining: Reducing costs and increasing STS operations effectiveness
NASA Technical Reports Server (NTRS)
Petersburg, R. K.
1985-01-01
The development of streamlining as a concept, its inclusion in the space transportation system engineering and operations support (STSEOS) contract, and how it serves as an incentive to management and technical support personnel is discussed. The mechanics of encouraging and processing streamlining suggestions, reviews, feedback to submitters, recognition, and how individual employee performance evaluations are used to motivation are discussed. Several items that were implemented are mentioned. Information reported and the methodology of determining estimated dollar savings are outlined. The overall effect of this activity on the ability of the McDonnell Douglas flight preparation and mission operations team to support a rapidly increasing flight rate without a proportional increase in cost is illustrated.
Sirintrapun, Sahussapont Joseph; Rudomina, Dorota; Mazzella, Allix; Feratovic, Rusmir; Alago, William; Siegelbaum, Robert; Lin, Oscar
2017-01-01
Background: The first satellite center to offer interventional radiology procedures at Memorial Sloan Kettering Cancer Center opened in October 2014. Two of the procedures offered, fine needle aspirations and core biopsies, required rapid on-site cytologic evaluation of smears and biopsy touch imprints for cellular content and adequacy. The volume and frequency of such evaluations did not justify hiring on-site cytotechnologists, and therefore, a dynamic robotic telecytology (TC) solution was created. In this technical article, we present a detailed description of our implementation of robotic TC. Methods: Pathology devised the remote robotic TC solution after acknowledging that it would not be cost effective to staff cytotechnologists on-site at the satellite location. Sakura VisionTek was selected as our robotic TC solution. In addition to configuration of the dynamic robotic TC solution, pathology realized integrating the technology solution into operations would require a multidisciplinary effort and reevaluation of existing staffing and workflows. Results: Extensively described are the architectural framework and multidisciplinary process re-design, created to navigate the constraints of our technical, cultural, and organizational environment. Also reviewed are the benefits and challenges associated with available desktop sharing solutions, particularly accounting for information security concerns. Conclusions: Dynamic robotic TC is effective for immediate evaluations performed without on-site cytotechnology staff. Our goal is providing an extensive perspective of the implementation process, particularly technical, cultural, and operational constraints. Through this perspective, our template can serve as an extensible blueprint for other centers interested in implementing robotic TC without on-site cytotechnologists. PMID:28966832
Sirintrapun, Sahussapont Joseph; Rudomina, Dorota; Mazzella, Allix; Feratovic, Rusmir; Alago, William; Siegelbaum, Robert; Lin, Oscar
2017-01-01
The first satellite center to offer interventional radiology procedures at Memorial Sloan Kettering Cancer Center opened in October 2014. Two of the procedures offered, fine needle aspirations and core biopsies, required rapid on-site cytologic evaluation of smears and biopsy touch imprints for cellular content and adequacy. The volume and frequency of such evaluations did not justify hiring on-site cytotechnologists, and therefore, a dynamic robotic telecytology (TC) solution was created. In this technical article, we present a detailed description of our implementation of robotic TC. Pathology devised the remote robotic TC solution after acknowledging that it would not be cost effective to staff cytotechnologists on-site at the satellite location. Sakura VisionTek was selected as our robotic TC solution. In addition to configuration of the dynamic robotic TC solution, pathology realized integrating the technology solution into operations would require a multidisciplinary effort and reevaluation of existing staffing and workflows. Extensively described are the architectural framework and multidisciplinary process re-design, created to navigate the constraints of our technical, cultural, and organizational environment. Also reviewed are the benefits and challenges associated with available desktop sharing solutions, particularly accounting for information security concerns. Dynamic robotic TC is effective for immediate evaluations performed without on-site cytotechnology staff. Our goal is providing an extensive perspective of the implementation process, particularly technical, cultural, and operational constraints. Through this perspective, our template can serve as an extensible blueprint for other centers interested in implementing robotic TC without on-site cytotechnologists.
The Defense Threat Reduction Agency's Technical Nuclear Forensics Research and Development Program
NASA Astrophysics Data System (ADS)
Franks, J.
2015-12-01
The Defense Threat Reduction Agency (DTRA) Technical Nuclear Forensics (TNF) Research and Development (R&D) Program's overarching goal is to design, develop, demonstrate, and transition advanced technologies and methodologies that improve the interagency operational capability to provide forensics conclusions after the detonation of a nuclear device. This goal is attained through the execution of three focus areas covering the span of the TNF process to enable strategic decision-making (attribution): Nuclear Forensic Materials Exploitation - Development of targeted technologies, methodologies and tools enabling the timely collection, analysis and interpretation of detonation materials.Prompt Nuclear Effects Exploitation - Improve ground-based capabilities to collect prompt nuclear device outputs and effects data for rapid, complementary and corroborative information.Nuclear Forensics Device Characterization - Development of a validated and verified capability to reverse model a nuclear device with high confidence from observables (e.g., prompt diagnostics, sample analysis, etc.) seen after an attack. This presentation will outline DTRA's TNF R&D strategy and current investments, with efforts focusing on: (1) introducing new technical data collection capabilities (e.g., ground-based prompt diagnostics sensor systems; innovative debris collection and analysis); (2) developing new TNF process paradigms and concepts of operations to decrease timelines and uncertainties, and increase results confidence; (3) enhanced validation and verification (V&V) of capabilities through technology evaluations and demonstrations; and (4) updated weapon output predictions to account for the modern threat environment. A key challenge to expanding these efforts to a global capability is the need for increased post-detonation TNF international cooperation, collaboration and peer reviews.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Shiaoguo
A novel Gas Pressurized Stripping (GPS) post-combustion carbon capture (PCC) process has been developed by Carbon Capture Scientific, LLC, CONSOL Energy Inc., Nexant Inc., and Western Kentucky University in this bench-scale project. The GPS-based process presents a unique approach that uses a gas pressurized technology for CO₂ stripping at an elevated pressure to overcome the energy use and other disadvantages associated with the benchmark monoethanolamine (MEA) process. The project was aimed at performing laboratory- and bench-scale experiments to prove its technical feasibility and generate process engineering and scale-up data, and conducting a techno-economic analysis (TEA) to demonstrate its energy usemore » and cost competitiveness over the MEA process. To meet project goals and objectives, a combination of experimental work, process simulation, and technical and economic analysis studies were applied. The project conducted individual unit lab-scale tests for major process components, including a first absorption column, a GPS column, a second absorption column, and a flasher. Computer simulations were carried out to study the GPS column behavior under different operating conditions, to optimize the column design and operation, and to optimize the GPS process for an existing and a new power plant. The vapor-liquid equilibrium data under high loading and high temperature for the selected amines were also measured. The thermal and oxidative stability of the selected solvents were also tested experimentally and presented. A bench-scale column-based unit capable of achieving at least 90% CO₂ capture from a nominal 500 SLPM coal-derived flue gas slipstream was designed and built. This integrated, continuous, skid-mounted GPS system was tested using real flue gas from a coal-fired boiler at the National Carbon Capture Center (NCCC). The technical challenges of the GPS technology in stability, corrosion, and foaming of selected solvents, and environmental, health and safety risks have been addressed through experimental tests, consultation with vendors and engineering analysis. Multiple rounds of TEA were performed to improve the GPS-based PCC process design and operation, and to compare the energy use and cost performance of a nominal 550-MWe supercritical pulverized coal (PC) plant among the DOE/NETL report Case 11 (the PC plant without CO₂ capture), the DOE/NETL report Case 12 (the PC plant with benchmark MEA-based PCC), and the PC plant using GPS-based PCC. The results reveal that the net power produced in the PC plant with GPS-based PCC is 647 MWe, greater than that of the Case 12 (550 MWe). The 20-year LCOE for the PC plant with GPS-based PCC is 97.4 mills/kWh, or 152% of that of the Case 11, which is also 23% less than that of the Case 12. These results demonstrate that the GPS-based PCC process is energy-efficient and cost-effective compared with the benchmark MEA process.« less
Large Aircraft Robotic Paint Stripping (LARPS) system and the high pressure water process
NASA Astrophysics Data System (ADS)
See, David W.; Hofacker, Scott A.; Stone, M. Anthony; Harbaugh, Darcy
1993-03-01
The aircraft maintenance industry is beset by new Environmental Protection Agency (EPA) guidelines on air emissions, Occupational Safety and Health Administration (OSHA) standards, dwindling labor markets, Federal Aviation Administration (FAA) safety guidelines, and increased operating costs. In light of these factors, the USAF's Wright Laboratory Manufacturing Technology Directorate and the Aircraft Division of the Oklahoma City Air Logistics Center initiated a MANTECH/REPTECH effort to automate an alternate paint removal method and eliminate the current manual methylene chloride chemical stripping methods. This paper presents some of the background and history of the LARPS program, describes the LARPS system, documents the projected operational flow, quantifies some of the projected system benefits and describes the High Pressure Water Stripping Process. Certification of an alternative paint removal method to replace the current chemical process is being performed in two phases: Process Optimization and Process Validation. This paper also presents the results of the Process Optimization for metal substrates. Data on the coating removal rate, residual stresses, surface roughness, preliminary process envelopes, and technical plans for process Validation Testing will be discussed.
DGs for Service Restoration to Critical Loads in a Secondary Network
DOE Office of Scientific and Technical Information (OSTI.GOV)
Xu, Yin; Liu, Chen-Ching; Wang, Zhiwen
During a major outage in a secondary network distribution system, distributed generators (DGs) connected to the primary feeders as well as the secondary network can be used to serve critical loads. This paper proposed a resilience-oriented method to determine restoration strategies for secondary network distribution systems after a major disaster. Technical issues associated with the restoration process are analyzed, including the operation of network protectors, inrush currents caused by the energization of network transformers, synchronization of DGs to the network, and circulating currents among DGs. A look-ahead load restoration framework is proposed, incorporating technical issues associated with secondary networks, limitsmore » on DG capacity and generation resources, dynamic constraints, and operational limits. The entire outage duration is divided into a sequence of periods. Restoration strategies can be adjusted at the beginning of each period using the latest information. Finally, numerical simulation of the modified IEEE 342-node low voltage networked test system is performed to validate the effectiveness of the proposed method.« less
DGs for Service Restoration to Critical Loads in a Secondary Network
Xu, Yin; Liu, Chen-Ching; Wang, Zhiwen; ...
2017-08-25
During a major outage in a secondary network distribution system, distributed generators (DGs) connected to the primary feeders as well as the secondary network can be used to serve critical loads. This paper proposed a resilience-oriented method to determine restoration strategies for secondary network distribution systems after a major disaster. Technical issues associated with the restoration process are analyzed, including the operation of network protectors, inrush currents caused by the energization of network transformers, synchronization of DGs to the network, and circulating currents among DGs. A look-ahead load restoration framework is proposed, incorporating technical issues associated with secondary networks, limitsmore » on DG capacity and generation resources, dynamic constraints, and operational limits. The entire outage duration is divided into a sequence of periods. Restoration strategies can be adjusted at the beginning of each period using the latest information. Finally, numerical simulation of the modified IEEE 342-node low voltage networked test system is performed to validate the effectiveness of the proposed method.« less
The Queued Service Observing Project at CFHT
NASA Astrophysics Data System (ADS)
Martin, Pierre; Savalle, Renaud; Vermeulen, Tom; Shapiro, Joshua N.
2002-12-01
In order to maximize the scientific productivity of the CFH12K mosaic wide-field imager (and soon MegaCam), the Queued Service Observing (QSO) mode was implemented at the Canada-France-Hawaii Telescope at the beginning of 2001. The QSO system consists of an ensemble of software components allowing for the submission of programs, the preparation of queues, and finally the execution and evaluation of observations. The QSO project is part of a broader system known as the New Observing Process (NOP). This system includes data acquisition, data reduction and analysis through a pipeline named Elixir, and a data archiving and distribution component (DADS). In this paper, we review several technical and operational aspects of the QSO project. In particular, we present our strategy, technical architecture, program submission system, and the tools developed for the preparation and execution of the queues. Our successful experience of over 150 nights of QSO operations is also discussed along with the future plans for queue observing with MegaCam and other instruments at CFHT.
Automated visual imaging interface for the plant floor
NASA Astrophysics Data System (ADS)
Wutke, John R.
1991-03-01
The paper will provide an overview of the challenges facing a user of automated visual imaging (" AVI" ) machines and the philosophies that should be employed in designing them. As manufacturing tools and equipment become more sophisticated it is increasingly difficult to maintain an efficient interaction between the operator and machine. The typical user of an AVI machine in a production environment is technically unsophisticated. Also operator and machine ergonomics are often a neglected or poorly addressed part of an efficient manufacturing process. This paper presents a number of man-machine interface design techniques and philosophies that effectively solve these problems.
NASA Technical Reports Server (NTRS)
Callender, E. David; Steinbacher, Jody
1989-01-01
This is the third of five volumes on Information System Life-Cycle and Documentation Standards which present a well organized, easily used standard for providing technical information needed for developing information systems, components, and related processes. This volume states the Software Management and Assurance Program documentation standard for a product specification document and for data item descriptions. The framework can be applied to any NASA information system, software, hardware, operational procedures components, and related processes.
Earthquake Advisory Services: A prototype development project
NASA Astrophysics Data System (ADS)
Lagorio, H. J.; Levin, H.
1980-10-01
Development of the prototype Earthquake Advisory Service (EAS) is reported. The EAS is designed to provide direct technical assistance and written materials to advise people who wish to make informed decisions about earthquake hazard reduction in their residences. It is intended also to be adapted to local conditions by community-based agencies. The EAS prototype involved the testing of early assumptions about program implementation, establishment of a systematic methodology review process, and a review of published information pertinent to the project. Operational procedures of the program and the process leading to implementation guidelines are described.
Mendes, Davidson Passos; Moraes, Geraldo Fabiano de Souza; Mendes, Juliana Cristina de Lima
2012-01-01
Our objective in this study, the analysis of potential fields of risk management in nursing work in psychiatric care to adolescents and children, while settings that go from the relationship between technical and organizational determinants of work activity and the skills of operators. It was established focus on the work process of the Technical and Nursing Assistants to seek for response elements in an attempt to understand the health-disease process experienced by these workers. It was used for analysis and data collection, through the method of Ergonomic Work Analysis (EWA), fifteen workers of nursing staff - T&NA, between effectives and contractors, and the strategies of action and regulation of these workers in relation to the interface that they deal with. The results show that the workers are exposed to all charges in an intense and specific way, causing physical and mental wear, as it approaches the psychological distress, exposure to the psychic pressure, not only through contact with the object of work, but the complexity of these relationships that are involved in nursing staff.
SIMBIOS Project; 2003 Annual Report
NASA Technical Reports Server (NTRS)
McClain, Charles R.; Fargion, Giulietta S.
2003-01-01
The purpose of this technical report is to provide current documentation of the the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project. The SIMBIOS Science Team Principal Investigators (PIs) original contributions to this report are in chapters four and above. The purpose of these contributions is to describe the current research status of the SIMBIOS-NRA-99 funded research. The contributions are published as submitted, with the exception of minor edits to correct obvious grammatical or clerical errors.
Assessing Nurse Anaesthetists' Non-Technical Skills in the operating room.
Lyk-Jensen, H T; Jepsen, R M H G; Spanager, L; Dieckmann, P; Østergaard, D
2014-08-01
Incident reporting and fieldwork in operating rooms have shown that some of the errors that arise in anaesthesia relate to inadequate use of non-technical skills. To provide a tool for training and feedback on nurse anaesthetists' non-technical skills, this study aimed to adapt the Anaesthetists' Non-Technical Skills (ANTS) as a behavioural marker system for the formative assessment of nurse anaesthetists' non-technical skills in the operating room. A qualitative approach with focus group interviews was used to identify the non-technical skills of nurse anaesthetists in the operating room. The interview data were transcribed verbatim. Directed content analysis was used to code and sort data deductively into the ANTS categories: task management, team working, situation awareness and decision making. The prototype named Nurse Anaesthetists' Non-Technical Skills (N-ANTS) was presented and discussed in a group of subject matter experts to ensure face validity. The N-ANTS system consists of the same four categories as ANTS and 15 underlying elements. Three to five good and poor behavioural markers for each element were identified. The headings and definitions of the categories and elements were adjusted to encompass the behavioural markers in N-ANTS. The differences that emerged mainly reflected statements regarding the establishment of role, competence, and task delegation. A behavioural marker system, N-ANTS, for nurse anaesthetists was adapted from a behavioural marker system, ANTS, for anaesthesiologists. © 2014 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chopra, Omesh K.; Diercks, Dwight R.; Ma, David Chia-Chiun
At the request of the United States (U.S.) government, the International Atomic Energy Agency (IAEA) assembled a team of 20 senior safety experts to review the regulatory framework for the safety of operating nuclear power plants in the United States. This review focused on the effectiveness of the regulatory functions implemented by the NRC and on its commitment to nuclear safety and continuous improvement. One suggestion resulting from that review was that the U.S. Nuclear Regulatory Commission (NRC) incorporate lessons learned from periodic safety reviews (PSRs) performed in other countries as an input to the NRC’s assessment processes. In themore » U.S., commercial nuclear power plants (NPPs) are granted an initial 40-year operating license, which may be renewed for additional 20-year periods, subject to complying with regulatory requirements. The NRC has established a framework through its inspection, and operational experience processes to ensure the safe operation of licensed nuclear facilities on an ongoing basis. In contrast, most other countries do not impose a specific time limit on the operating licenses for NPPs, they instead require that the utility operating the plant perform PSRs, typically at approximately 10-year intervals, to assure continued safe operation until the next assessment. The staff contracted with Argonne National Laboratory (Argonne) to perform a pilot review of selected translated PSR assessment reports and related documentation from foreign nuclear regulatory authorities to identify any potential new regulatory insights regarding license renewal-related topics and NPP operating experience (OpE). A total of 14 PSR assessment documents from 9 countries were reviewed. For all of the countries except France, individual reports were provided for each of the plants reviewed. In the case of France, three reports were provided that reviewed the performance assessment of thirty-four 900-MWe reactors of similar design commissioned between 1978 and 1988. All of the reports reviewed were the regulator’s assessment of the PSR findings rather than the original PSR report, and all but one were English translations from the original language. In these reviews, it was found that most of the countries base their regulatory guidance to some extent (and often to a large extent) on U.S. design codes and standards, NRC regulatory guidance, and U.S. industry guidance. In addition, many of the observed operational technical issues and OpE events reported for U.S. reactors are also cited in the PSR reports. The PSR reports also identified a number of potential technical material/component performance issues and OpE events that are not commonly reported for U.S. plants.« less
Technical Operating Procedures for State Access Under the Oil Pollution Act of 1990
DOT National Transportation Integrated Search
1992-11-01
Technical Operating Procedures (TOPs) to be used by the National Pollution Funds : Center (NPFC) to provide guidance to Federal On-Scene Coordinators (FOSCs) and : Coast Guard Districts concerning a State Governor's request for access to the : Oil Sp...
ERIC Educational Resources Information Center
Frasier, James E.; Stanton, William
This publication reports the development of the vocational-technical resource consortia in Ohio and identifies the operational procedures associated with successful programs. Five exemplary consortia were studied in some depth; however, data were obtained from all of the 23 consortia in the state. The research indicates that the consortium is an…
HOPE information system review
NASA Astrophysics Data System (ADS)
Suzuki, Yoshiaki; Nishiyama, Kenji; Ono, Shuuji; Fukuda, Kouin
1992-08-01
An overview of the review conducted on H-2 Orbiting Plane (HOPE) is presented. A prototype model was constructed by inputting various technical information proposed by related laboratories. Especially operation flow which enables understanding of correlation between various analysis items, judgement criteria, technical data, and interfaces with others was constructed. Technical information data base and retrieval systems were studied. A Macintosh personal computer was selected for information shaping because of its excellent function, performance, operability, and software completeness.
NASA Institute for Advanced Concepts
NASA Technical Reports Server (NTRS)
Cassanova, Robert A.
1999-01-01
The purpose of NASA Institute for Advanced Concepts (NIAC) is to provide an independent, open forum for the external analysis and definition of space and aeronautics advanced concepts to complement the advanced concepts activities conducted within the NASA Enterprises. The NIAC will issue Calls for Proposals during each year of operation and will select revolutionary advanced concepts for grant or contract awards through a peer review process. Final selection of awards will be with the concurrence of NASA's Chief Technologist. The operation of the NIAC is reviewed biannually by the NIAC Science, Exploration and Technology Council (NSETC) whose members are drawn from the senior levels of industry and universities. The process of defining the technical scope of the initial Call for Proposals was begun with the NIAC "Grand Challenges" workshop conducted on May 21-22, 1998 in Columbia, Maryland. These "Grand Challenges" resulting from this workshop became the essence of the technical scope for the first Phase I Call for Proposals which was released on June 19, 1998 with a due date of July 31, 1998. The first Phase I Call for Proposals attracted 119 proposals. After a thorough peer review, prioritization by NIAC and technical concurrence by NASA, sixteen subgrants were awarded. The second Phase I Call for Proposals was released on November 23, 1998 with a due date of January 31, 1999. Sixty-three (63) proposals were received in response to this Call. On December 2-3, 1998, the NSETC met to review the progress and future plans of the NIAC. The next NSETC meeting is scheduled for August 5-6, 1999. The first Phase II Call for Proposals was released to the current Phase I grantees on February 3,1999 with a due date of May 31, 1999. Plans for the second year of the contract include a continuation of the sequence of Phase I and Phase II Calls for Proposals and hosting the first NIAC Annual Meeting and USRA/NIAC Technical Symposium in NASA HQ.
NASA Astrophysics Data System (ADS)
Bulega, T.; Kyeyune, A.; Onek, P.; Sseguya, R.; Mbabazi, D.; Katwiremu, E.
2011-10-01
Several publications have identified technical challenges facing Uganda's National Transmission Backbone Infrastructure project. This research addresses the technical limitations of the National Transmission Backbone Infrastructure project, evaluates the goals of the project, and compares the results against the technical capability of the backbone. The findings of the study indicate a bandwidth deficit, which will be addressed by using dense wave division multiplexing repeaters, leasing bandwidth from private companies. Microwave links for redundancy, a Network Operation Center for operation and maintenance, and deployment of wireless interoperability for microwave access as a last-mile solution are also suggested.
Engineering and Safety Partnership Enhances Safety of the Space Shuttle Program (SSP)
NASA Technical Reports Server (NTRS)
Duarte, Alberto
2007-01-01
Project Management must use the risk assessment documents (RADs) as tools to support their decision making process. Therefore, these documents have to be initiated, developed, and evolved parallel to the life of the project. Technical preparation and safety compliance of these documents require a great deal of resources. Updating these documents after-the-fact not only requires substantial increase in resources - Project Cost -, but this task is also not useful and perhaps an unnecessary expense. Hazard Reports (HRs), Failure Modes and Effects Analysis (FMEAs), Critical Item Lists (CILs), Risk Management process are, among others, within this category. A positive action resulting from a strong partnership between interested parties is one way to get these documents and related processes and requirements, released and updated in useful time. The Space Shuttle Program (SSP) at the Marshall Space Flight Center has implemented a process which is having positive results and gaining acceptance within the Agency. A hybrid Panel, with equal interest and responsibilities for the two larger organizations, Safety and Engineering, is the focal point of this process. Called the Marshall Safety and Engineering Review Panel (MSERP), its charter (Space Shuttle Program Directive 110 F, April 15, 2005), and its Operating Control Plan emphasizes the technical and safety responsibilities over the program risk documents: HRs; FMEA/CILs; Engineering Changes; anomalies/problem resolutions and corrective action implementations, and trend analysis. The MSERP has undertaken its responsibilities with objectivity, assertiveness, dedication, has operated with focus, and has shown significant results and promising perspectives. The MSERP has been deeply involved in propulsion systems and integration, real time technical issues and other relevant reviews, since its conception. These activities have transformed the propulsion MSERP in a truly participative and value added panel, making a difference for the safety of the Space Shuttle Vehicle, its crew, and personnel. Because of the MSERP's valuable contribution to the assessment of safety risk for the SSP, this paper also proposes an enhanced Panel concept that takes this successful partnership concept to a higher level of 'true partnership'. The proposed panel is aimed to be responsible for the review and assessment of all risk relative to Safety for new and future aerospace and related programs.
49 CFR 845.22 - Technical panel.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Technical panel. 845.22 Section 845.22... Technical panel. The Director, Bureau of Accident Investigation, or the Director, Bureau of Field Operations, shall designate members of the Board's technical staff to participate in the hearing and initially...
[Working conditions in operating rooms].
Kułagowska, Ewa
2007-01-01
The aim of this study was to get acquainted with the opinions of the nursing staff on working conditions at their workplace. The study was carried out in a group of 398 nurses working in various kinds of operating rooms at 11 public hospitals. A questionnaire was used as a major tool of this study. The questionnaires were filled in by 259 operating room nurses (circulating nurses) and 139 nurse-anesthetists. The collected data show that working conditions in operating rooms do not ensure safety of the nursing staff at work. The main sources of problems are: work organization, technical factors, work equipment, work space, knowledge of hazards and strenuous factors among nurses, ways of preventing and/or limiting them. These elements are serious occupational risk factors influencing the work process and health status of nurses.
WFIRST: STScI Science Operations Center (SSOC) Activities and Plans
NASA Astrophysics Data System (ADS)
Gilbert, Karoline M.; STScI WFIRST Team
2018-01-01
The science operations for the WFIRST Mission will be distributed between Goddard Space Flight Center, the Space Telescope Science Institute (STScI), and the Infrared Processing and Analysis Center (IPAC). The STScI Science Operations Center (SSOC) will schedule and archive all WFIRST observations, will calibrate and produce pipeline-reduced data products for the Wide Field Instrument, and will support the astronomical community in planning WFI observations and analyzing WFI data. During the formulation phase, WFIRST team members at STScI have developed operations concepts for scheduling, data management, and the archive; have performed technical studies investigating the impact of WFIRST design choices on data quality and analysis; and have built simulation tools to aid the community in exploring WFIRST’s capabilities. We will highlight examples of each of these efforts.
Robinson, Suzanne; Dickinson, Helen; Durrington, Learne
2016-01-01
The concept of commissioning is starting to gain traction in the Australian health system. Primary Care Networks began operations in July 2015 with a remit around commissioning health services. Despite the centrality of this concept, we know relatively little about commissioning in Australia. Other systems have experimented with it for some time, and this paper reviews the evidence and lessons inherent within the international literature. The study defines commissioning, and explores experiences of others who have adopted commissioning approaches and the evidence concerning the outcomes of these experiments. Commissioning is a difficult topic in many senses and its application to a complex area such as health reform can make it even more challenging. Ultimately, this evidence suggests that commissioning is more than simply a technical or operational process, but one that is value-based and relational. This is not to downplay the technical aspects, which in many jurisdictions have resulted in explicit and evidenced-based approaches to planning and priority setting. However, if new commissioning organisations, such as Primary Health Networks, are to have an impact, they need to balance the operational and relational elements of commissioning.
Medical Data Architecture Project Status
NASA Technical Reports Server (NTRS)
Krihak, M.; Middour, C.; Lindsey, A.; Marker, N.; Wolfe, S.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.
2017-01-01
The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current International Space Station (ISS) medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable an increasingly autonomous crew than the current ISS paradigm. The MDA will develop capabilities that support automated data collection, and the necessary functionality and challenges in executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. To attain this goal, the first year of the MDA project focused on reducing technical risk, developing documentation and instituting iterative development processes that established the basis for the first version of MDA software (or Test Bed 1). Test Bed 1 is based on a nominal operations scenario authored by the ExMC Element Scientist. This narrative was decomposed into a Concept of Operations that formed the basis for Test Bed 1 requirements. These requirements were successfully vetted through the MDA Test Bed 1 System Requirements Review, which permitted the MDA project to begin software code development and component integration. This paper highlights the MDA objectives, development processes, and accomplishments, and identifies the fiscal year 2017 milestones and deliverables in the upcoming year.
Radford, Eleanor J; Fotis, Theo
2018-01-01
Operating theatre scrub nurses (OTSNs) are not required to have undertaken a secondary or specialist post-registration theatre qualification to work in the operating theatre (OT) setting in the UK. From the systematic review there is only very limited literature or research in how technical scrub skills are acquired. This study explores the lived experiences of OTSNs learning technical scrub skills. The study employed the qualitative methodology of interpretative phenomenological analysis. Data was collected from six participating OTSNs using semi-structured interviews. Four superordinate themes emerged: How technical scrub skills are established, Gatekeepers, How the learner feels whilst learning and, Reflections of the experienced scrub nurse. The study found that the experiences of OTSNs learning technical scrub skills are varied and a variety of teaching and learning methods are utilised. These experiences were influenced by the team, mentor and surgeon within the OT environment. Lived experiences were also influenced by organisational structure and service pressures within the NHS.
47 CFR 22.383 - In-building radiation systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false In-building radiation systems. 22.383 Section... MOBILE SERVICES Operational and Technical Requirements Technical Requirements § 22.383 In-building radiation systems. Licensees may install and operate in-building radiation systems without applying for...
78 FR 33863 - Relationship Between General Design Criteria and Technical Specification Operability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-05
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0179] Relationship Between General Design Criteria and...) 2013-05, ``NRC Position on the Relationship Between General Design Criteria and Technical Specification Operability.'' This RIS clarifies the NRC staff's position on the relationship between the general design...
Numerical and Experimental Study of an Ambient Air Vaporizer Coupled with a Compact Heat Exchanger
NASA Astrophysics Data System (ADS)
Kimura, Randon
The University of Washington was tasked with designing a "21st century engine" that will make use of the thermal energy available in cryogenic gasses due to their coldness. There are currently large quantities of cryogenic gases stored throughout the U.S. at industrial facilities whereupon the regasification process, the potential for the fluid to do work is wasted. The engine proposed by the University of Washington will try to capture some of that wasted energy. One technical challenge that must be overcome during the regasification process is providing frost free operation. This thesis presents the numerical analysis and experimental testing of a passive heat exchange system that uses ambient vaporizers coupled with compact heat exchangers to provide frost free operation while minimizing pressure drop.
NASA Technical Reports Server (NTRS)
Williams, Daniel M.
2006-01-01
Described is the research process that NASA researchers used to validate the Small Aircraft Transportation System (SATS) Higher Volume Operations (HVO) concept. The four phase building-block validation and verification process included multiple elements ranging from formal analysis of HVO procedures to flight test, to full-system architecture prototype that was successfully shown to the public at the June 2005 SATS Technical Demonstration in Danville, VA. Presented are significant results of each of the four research phases that extend early results presented at ICAS 2004. HVO study results have been incorporated into the development of the Next Generation Air Transportation System (NGATS) vision and offer a validated concept to provide a significant portion of the 3X capacity improvement sought after in the United States National Airspace System (NAS).
Bench-Scale Filtration Testing in Support of the Pretreatment Engineering Platform (PEP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Billing, Justin M.; Daniel, Richard C.; Kurath, Dean E.
Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP testing program specifies that bench-scale testing is to bemore » performed in support of specific operations, including filtration, caustic leaching, and oxidative leaching.« less
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
Biogasification of Walt Disney World biomass waste blend. Final report, January 1982-December 1985
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biljetina, R.; Chynoweth, D.P.; Srivastava, V.J.
1986-10-01
The objective of the research is to develop efficient processes for conversion of biomass-waste blends to methane and other resources. To evaluate the technical and economic feasibility, an experimental test unit (ETU) was designed and operated at the Reedy Creek Wastewater Treatment Plant at Walt Disney World in Lake Buena Vista, Florida. The facility integrates a biomethanogenic-conversion process with a wastewater-treatment process employing water hyacinth ponds for secondary and tertiary treatment of sewage. Harvested water hyacinth is subsequently combined with sludge from the primary wastewater clarifier and fed at 1-wet-ton per day to the ETU digester. This results in themore » production of methane and other useful products. The digester was operated as a non-mixed, solids concentrating digester to encourage higher solids and microorganism retention times. Data collected during six steady-state operating periods confirmed earlier laboratory observations that this digester consistently produces 15 to 25% higher methane yields and conversions when compared to conventional stirred-tank digester. Digester operation was evaluated at different loading rates, solids blend ratios and feed configurations. Results from the program have provided a data base for the design of larger conversion systems.« less
The advanced linked extended reconnaissance and targeting technology demonstration project
NASA Astrophysics Data System (ADS)
Cruickshank, James; de Villers, Yves; Maheux, Jean; Edwards, Mark; Gains, David; Rea, Terry; Banbury, Simon; Gauthier, Michelle
2007-06-01
The Advanced Linked Extended Reconnaissance & Targeting (ALERT) Technology Demonstration (TD) project is addressing key operational needs of the future Canadian Army's Surveillance and Reconnaissance forces by fusing multi-sensor and tactical data, developing automated processes, and integrating beyond line-of-sight sensing. We discuss concepts for displaying and fusing multi-sensor and tactical data within an Enhanced Operator Control Station (EOCS). The sensor data can originate from the Coyote's own visible-band and IR cameras, laser rangefinder, and ground-surveillance radar, as well as beyond line-of-sight systems such as a mini-UAV and unattended ground sensors. The authors address technical issues associated with the use of fully digital IR and day video cameras and discuss video-rate image processing developed to assist the operator to recognize poorly visible targets. Automatic target detection and recognition algorithms processing both IR and visible-band images have been investigated to draw the operator's attention to possible targets. The machine generated information display requirements are presented with the human factors engineering aspects of the user interface in this complex environment, with a view to establishing user trust in the automation. The paper concludes with a summary of achievements to date and steps to project completion.
Brewin, James; Tang, Jessica; Dasgupta, Prokar; Khan, Muhammad S; Ahmed, Kamran; Bello, Fernando; Kneebone, Roger; Jaye, Peter
2015-07-01
To evaluate the face, content and construct validity of the distributed simulation (DS) environment for technical and non-technical skills training in endourology. To evaluate the educational impact of DS for urology training. DS offers a portable, low-cost simulated operating room environment that can be set up in any open space. A prospective mixed methods design using established validation methodology was conducted in this simulated environment with 10 experienced and 10 trainee urologists. All participants performed a simulated prostate resection in the DS environment. Outcome measures included surveys to evaluate the DS, as well as comparative analyses of experienced and trainee urologist's performance using real-time and 'blinded' video analysis and validated performance metrics. Non-parametric statistical methods were used to compare differences between groups. The DS environment demonstrated face, content and construct validity for both non-technical and technical skills. Kirkpatrick level 1 evidence for the educational impact of the DS environment was shown. Further studies are needed to evaluate the effect of simulated operating room training on real operating room performance. This study has shown the validity of the DS environment for non-technical, as well as technical skills training. DS-based simulation appears to be a valuable addition to traditional classroom-based simulation training. © 2014 The Authors BJU International © 2014 BJU International Published by John Wiley & Sons Ltd.
ERIC Educational Resources Information Center
National Academies Press, 2010
2010-01-01
The Air Force requires technical skills and expertise across the entire range of activities and processes associated with the development, fielding, and employment of air, space, and cyber operational capabilities. The growing complexity of both traditional and emerging missions is placing new demands on education, training, career development,…
Technical Evaluation of the RHS 200 for High Speed Ferry Applications and Coast Guard Missions
1983-12-01
considered separate hullborne and foilborne modes of operation. The TDAS computer was programmed to select the followinq calibration curve at transducer...such brief bursts of data. The computer used in the PSD analysis was niot programmed to process and average consecutive spectra from a long term data...152 27 - ilydrostatic Computer Procgram Input (03-600 Version) .................. 158 2R - Operatincr and
Technical Standards for Command and Control Information Systems (CCISs) and Information Technology
1994-02-01
formatting, transmitting, receiving, and processing imagery and imagery-related information. The N1TFS is in essence the suite of individual standards...also known as Limited Operational Capability-Europe) and the German Joint Analysis System Military Intelligence ( JASMIN ). Among the approaches being... essence , the other systems utilize a one-level address space where addressing consists of identifying the fire support unit. However, AFATDS utilizes a two
The Message Processing and Distribution System Development.
1981-06-01
are desirable to be included in the system to be developed. 15 I 4p -~I, IBM marketed a protection mechanism in its operating systems called "locks...instructors is the intense demand for individuals with high technical expertise in the civilian market . These civilian firms usually offer very high starting...salaries to qualified personnel. Since 4PDS technicians were generally some of our most highly trained sailors, their marketability was exceptionally
2014-12-01
chemical etching EDM electrical discharge machine EID enterprise identifier EOSS Engineering Operational Sequencing System F Fahrenheit...Center in Corona , California, released a DoN IUID Marking Guide, which made recommendations on how to mark legacy items. It provides technical...uploaded into the IUID registry managed by the Naval Surface Warfare Center (NSWC) in Corona , California. There is no set amount of information
Nimbus 7 Coastal Zone Color Scanner (CZCS). Level 1 data product users' guide
NASA Technical Reports Server (NTRS)
Williams, S. P.; Szajna, E. F.; Hovis, W. A.
1985-01-01
The coastal zone color scanner (CZCS) is a scanning multispectral radiometer designed specifically for the remote sensing of Ocean Color parameters from an Earth orbiting space platform. A technical manual which is intended for users of NIMBUS 7 CZCS Level 1 data products is presented. It contains information needed by investigators and data processing personnel to operate on the data using digital computers and related equipment.
2012-01-01
Background The introduction of a new method of transmitting prescriptions from general practices to community pharmacies in England (Electronic Prescription Service Release 2 (EPS2)) has generated debate on how it will change work practice. As EPS2 will be a key technical element in dispensing, we reviewed the literature to find that there were no studies on how social and technical elements come together to form work practice in community pharmacies. This means the debate has little point of reference. Our aim therefore was to study the ways social and technical elements of a community pharmacy are used to achieve dispensing through the development of a conceptual model on pharmacy work practice, and to consider how a core technical element such the EPS2 could change work practice. Method We used ethnographic methods inclusive of case-study observations and interviews to collect qualitative data from 15 community pharmacies that were in the process of adopting or were soon to adopt EPS2. We analysed the case studies thematically and used rigorous multi-dimensional and multi-disciplinary interpretive validation techniques to cross analyse findings. Results In practice, dispensing procedures were not designed to take into account variations in human and technical integration, and assumed that repetitive and collective use of socio-technical elements were at a constant. Variables such as availability of social and technical resources, and technical know-how of staff were not taken into account in formalised procedures. Yet community pharmacies were found to adapt their dispensing in relation to the balance of social and technical elements available, and how much of the social and technical elements they were willing to integrate into dispensing. While some integrated as few technical elements as possible, some depended entirely on technical artefacts. This pattern also applied to the social elements of dispensing. Through the conceptual model development process, we identified three approaches community pharmacies used to appropriate procedures in practice. These were ‘technically oriented’, ‘improvising’ or ‘socially oriented’. Conclusion We offer a model of different work approaches community pharmacies use to dispense, which suggests that when adopting a core technical element such as the EPS2 system of dispensing there could be variations in its successful adoption. Technically oriented pharmacies might find it easiest to integrate a similar artefact into work practice although needs EPS2 to synchronise effectively with existing technologies. Pharmacies adopting an improvising-approach have the potential to improve how they organise dispensing through EPS2 although they will need to improve how they apply their operating procedures. Socially oriented pharmacies will need to dramatically adapt their approach to dispensing since they usually rely on few technical tools. PMID:23256484
Harvey, Jasmine; Avery, Anthony J; Waring, Justin; Barber, Nick
2012-12-20
The introduction of a new method of transmitting prescriptions from general practices to community pharmacies in England (Electronic Prescription Service Release 2 (EPS2)) has generated debate on how it will change work practice. As EPS2 will be a key technical element in dispensing, we reviewed the literature to find that there were no studies on how social and technical elements come together to form work practice in community pharmacies. This means the debate has little point of reference. Our aim therefore was to study the ways social and technical elements of a community pharmacy are used to achieve dispensing through the development of a conceptual model on pharmacy work practice, and to consider how a core technical element such the EPS2 could change work practice. We used ethnographic methods inclusive of case-study observations and interviews to collect qualitative data from 15 community pharmacies that were in the process of adopting or were soon to adopt EPS2. We analysed the case studies thematically and used rigorous multi-dimensional and multi-disciplinary interpretive validation techniques to cross analyse findings. In practice, dispensing procedures were not designed to take into account variations in human and technical integration, and assumed that repetitive and collective use of socio-technical elements were at a constant. Variables such as availability of social and technical resources, and technical know-how of staff were not taken into account in formalised procedures. Yet community pharmacies were found to adapt their dispensing in relation to the balance of social and technical elements available, and how much of the social and technical elements they were willing to integrate into dispensing. While some integrated as few technical elements as possible, some depended entirely on technical artefacts. This pattern also applied to the social elements of dispensing. Through the conceptual model development process, we identified three approaches community pharmacies used to appropriate procedures in practice. These were 'technically oriented', 'improvising' or 'socially oriented'. We offer a model of different work approaches community pharmacies use to dispense, which suggests that when adopting a core technical element such as the EPS2 system of dispensing there could be variations in its successful adoption. Technically oriented pharmacies might find it easiest to integrate a similar artefact into work practice although needs EPS2 to synchronise effectively with existing technologies. Pharmacies adopting an improvising-approach have the potential to improve how they organise dispensing through EPS2 although they will need to improve how they apply their operating procedures. Socially oriented pharmacies will need to dramatically adapt their approach to dispensing since they usually rely on few technical tools.
2004-02-03
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers check over the Italian-built Node 2, a future element of the International Space Station. The second of three Station connecting modules, the Node 2 attaches to the end of the U.S. Lab and provides attach locations for several other elements. Kopra is currently assigned technical duties in the Space Station Branch of the Astronaut Office, where his primary focus involves the testing of crew interfaces for two future ISS modules as well as the implementation of support computers and operational Local Area Network on ISS. Node 2 is scheduled to launch on mission STS-120, Station assembly flight 10A.
Evaluation of Flight Attendant Technical Knowledge
NASA Technical Reports Server (NTRS)
Dunbar, Melisa G.; Chute, Rebecca D.; Rosekind, Mark (Technical Monitor)
1997-01-01
Accident and incident reports have indicated that flight attendants have numerous opportunities to provide the flight-deck crew with operational information that may prevent or lessen the severity of a potential problem. Additionally, as carrier fleets transition from three person to two person flight-deck crews, the reliance upon the cabin crew for the transfer of this information may increase further. Recent research indicates that flight attendants do not feel confident in their ability to describe mechanical parts or malfunctions of the aircraft, and the lack of flight attendant technical training has been referenced in a number of recent reports. Chute and Wiener describe five factors which may produce communication barriers between cockpit and cabin crews: the historical background of aviation, the physical separation of the two crews, psychosocial issues, regulatory factors, and organizational factors. By examining these areas of division we can identify possible bridges and address the implications of deficient cockpit/cabin communication on flight safety. Flight attendant operational knowledge may provide some mitigation of these barriers. The present study explored both flight attendant technical knowledge and flight attendant and pilot expectations of flight attendant technical knowledge. To assess the technical knowledge of cabin crewmembers, 177 current flight attendants from two U.S. carriers voluntarily completed a 13-item technical quiz. To investigate expectations of flight attendant technical knowledge, 181 pilots and a second sample of 96 flight attendants, from the same two airlines, completed surveys designed to capture each group's expectations of operational knowledge required of flight attendants. Analyses revealed several discrepancies between the present level of flight attendant operational knowledge and pilots' and flight attendants' expected and desired levels of technical knowledge. Implications for training will be discussed.
The financial implications of endovascular aneurysm repair in the cost containment era.
Stone, David H; Horvath, Alexander J; Goodney, Philip P; Rzucidlo, Eva M; Nolan, Brian W; Walsh, Daniel B; Zwolak, Robert M; Powell, Richard J
2014-02-01
Endovascular aneurysm repair (EVAR) is associated with significant direct device costs. Such costs place EVAR at odds with efforts to constrain healthcare expenditures. This study examines the procedure-associated costs and operating margins associated with EVAR at a tertiary care academic medical center. All infrarenal EVARs performed from April 2011 to March 2012 were identified (n = 127). Among this cohort, 49 patients met standard commercial instruction for use guidelines, were treated using a single manufacturer device, and billed to Medicare diagnosis-related group (DRG) 238. Of these 49 patients, net technical operating margins (technical revenue minus technical cost) were calculated in conjunction with the hospital finance department. EVAR implant costs were determined for each procedure. DRG 238-associated costs and length of stay were benchmarked against other academic medical centers using University Health System Consortium 2012 data. Among the studied EVAR cohort (age 75, 82% male, mean length of stay, 1.7 days), mean technical costs totaled $31,672. Graft implants accounted for 52% of the allocated technical costs. Institutional overhead was 17% ($5495) of total technical costs. Net mean total technical EVAR-associated operating margins were -$4015 per procedure. Our institutional costs and length of stay, when benchmarked against comparable centers, remained in the lowest quartile nationally using University Health System Consortium costs for DRG 238. Stent graft price did not correlate with total EVAR market share. EVAR is currently associated with significant negative operating margins among Medicare beneficiaries. Currently, device costs account for over 50% of EVAR-associated technical costs and did not impact EVAR market share, reflecting an unawareness of cost differential among surgeons. These data indicate that EVAR must undergo dramatic care delivery redesign for this practice to remain sustainable. Copyright © 2014 Society for Vascular Surgery. Published by Mosby, Inc. All rights reserved.
Quality management of nuchal translucency ultrasound measurement in Australia.
Nisbet, Debbie; Robertson, Ann; Mannil, Blessy; Pincham, Vanessa; Mclennan, Andrew
2018-02-22
Nuchal translucency measurement has an established role in first trimester screening. Accurate measurement requires that technical guidelines are followed. Performance can be monitored by auditing the distribution of measurements obtained in a series of cases. The primary aim is to develop an accessible, theory-based educational program for individuals whose distribution of measurements at audit falls outside an acceptable range, and assess operator performance following this intervention. Operators whose nuchal translucency measurement distributions fall outside a normal range (38-65% above the median) were expected to undergo a teleconference tutorial. Accessible from anywhere in Australia, the one hour tutorials were run by a senior sonographer (to explain technical ultrasound aspects) and the audit program manager (to explain the audit process). In 2011, 83 operators attended the teleconference tutorials. Compared to a random comparison group of operators meeting standard in 2011, teleconference tutorial attendees were significantly more likely to: (i) operate in rural or regional, rather than metropolitan, centres (P = 0.001); (ii) be less experienced (P < 0.0005); and (iii) have lower annual scan numbers (P = 0.0012). Improvement in nuchal translucency measurement quality was seen after one audit cycle and was maintained over subsequent years. The mean percentage of the study cohort reaching standard over the five-year audit was 77.8% which was not statistically different from the average for the comparison cohort of all other audited operators (79.3%; P = 0.61). Teleconference tutorials are a convenient, accessible and effective way to obtain immediate and sustained improvement in operator performance. © 2018 The Royal Australian and New Zealand College of Obstetricians and Gynaecologists.
Concept of Operations Visualization in Support of Ares I Production
NASA Technical Reports Server (NTRS)
Chilton, James H.; Smith, Daid Alan
2008-01-01
Boeing was selected in 2007 to manufacture Ares I Upper Stage and Instrument Unit according to NASA's design which would require the use of the latest manufacturing and integration processes to meet NASA budget and schedule targets. Past production experience has established that the majority of the life cycle cost is established during the initial design process. Concept of Operations (CONOPs) visualizations/simulations help to reduce life cycle cost during the early design stage. Production and operation visualizations can reduce tooling, factory capacity, safety, and build process risks while spreading program support across government, academic, media and public constituencies. The NASA/Boeing production visualization (DELMIA; Digital Enterprise Lean Manufacturing Interactive Application) promotes timely, concurrent and collaborative producibility analysis (Boeing)while supporting Upper Stage Design Cycles (NASA). The DELMIA CONOPs visualization reduced overall Upper Stage production flow time at the manufacturing facility by over 100 man-days to 312.5 man-days and helped to identify technical access issues. The NASA/Boeing Interactive Concept of Operations (ICON) provides interactive access to Ares using real mission parameters, allows users to configure the mission which encourages ownership and identifies areas for improvement, allows mission operations or spacecraft detail to be added as needed, and provides an effective, low coast advocacy, outreach and education tool.
Traversari, Roberto; Goedhart, Rien; Schraagen, Jan Maarten
2013-01-01
The objective is evaluation of a traditionally designed operating room using simulation of various surgical workflows. A literature search showed that there is no evidence for an optimal operating room layout regarding the position and size of an ultraclean ventilation (UCV) canopy with a separate preparation room for laying out instruments and in which patients are induced in the operating room itself. Neither was literature found reporting on process simulation being used for this application. Many technical guidelines and designs have mainly evolved over time, and there is no evidence on whether the proposed measures are also effective for the optimization of the layout for workflows. The study was conducted by applying observational techniques to simulated typical surgical procedures. Process simulations which included complete surgical teams and equipment required for the intervention were carried out for four typical interventions. Four observers used a form to record conflicts with the clean area boundaries and the height of the supply bridge. Preferences for particular layouts were discussed with the surgical team after each simulated procedure. We established that a clean area measuring 3 × 3 m and a supply bridge height of 2.05 m was satisfactory for most situations, provided a movable operation table is used. The only cases in which conflicts with the supply bridge were observed were during the use of a surgical robot (Da Vinci) and a surgical microscope. During multiple trauma interventions, bottlenecks regarding the dimensions of the clean area will probably arise. The process simulation of four typical interventions has led to significantly different operating room layouts than were arrived at through the traditional design process. Evidence-based design, human factors, work environment, operating room, traditional design, process simulation, surgical workflowsPreferred Citation: Traversari, R., Goedhart, R., & Schraagen, J. M. (2013). Process simulation during the design process makes the difference: Process simulations applied to a traditional design. Health Environments Research & Design Journal 6(2), pp 58-76.
The Kepler End-to-End Data Pipeline: From Photons to Far Away Worlds
NASA Technical Reports Server (NTRS)
Cooke, Brian; Thompson, Richard; Standley, Shaun
2012-01-01
The Kepler mission is described in overview and the Kepler technique for discovering exoplanets is discussed. The design and implementation of the Kepler spacecraft, tracing the data path from photons entering the telescope aperture through raw observation data transmitted to the ground operations team is described. The technical challenges of operating a large aperture photometer with an unprecedented 95 million pixel detector are addressed as well as the onboard technique for processing and reducing the large volume of data produced by the Kepler photometer. The technique and challenge of day-to-day mission operations that result in a very high percentage of time on target is discussed. This includes the day to day process for monitoring and managing the health of the spacecraft, the annual process for maintaining sun on the solar arrays while still keeping the telescope pointed at the fixed science target, the process for safely but rapidly returning to science operations after a spacecraft initiated safing event and the long term anomaly resolution process.The ground data processing pipeline, from the point that science data is received on the ground to the presentation of preliminary planetary candidates and supporting data to the science team for further evaluation is discussed. Ground management, control, exchange and storage of Kepler's large and growing data set is discussed as well as the process and techniques for removing noise sources and applying calibrations to intermediate data products.
Software engineering aspects of real-time programming concepts
NASA Astrophysics Data System (ADS)
Schoitsch, Erwin
1986-08-01
Real-time programming is a discipline of great importance not only in process control, but also in fields like communication, office automation, interactive databases, interactive graphics and operating systems development. General concepts of concurrent programming and constructs for process-synchronization are discussed in detail. Tasking and synchronization concepts, methods of process communication, interrupt and timeout handling in systems based on semaphores, signals, conditional critical regions or on real-time languages like Concurrent PASCAL, MODULA, CHILL and ADA are explained and compared with each other. The second part deals with structuring and modularization of technical processes to build reliable and maintainable real time systems. Software-quality and software engineering aspects are considered throughout the paper.
Automated Array Assembly, Phase 2
NASA Technical Reports Server (NTRS)
Daiello, R. V.
1978-01-01
The purpose of the overall program is to establish technological readiness and provide verification for the elements of a manufacturing sequence which would ultimately be suitable for the large-scale production of silicon solar-array modules at a selling price of less than $500/kW. A program and process plan for accomplishing this objective was developed and put into operation. Three junction-formation processes are shown; since cost analysis shows that they do not differ greatly in cost, each should be considered for technical merits and possible future cost reduction. The progress made in the various process steps of the plan is described, and conclusions are presented.
The TMIS life-cycle process document, revision A
NASA Technical Reports Server (NTRS)
1991-01-01
The Technical and Management Information System (TMIS) Life-Cycle Process Document describes the processes that shall be followed in the definition, design, development, test, deployment, and operation of all TMIS products and data base applications. This document is a roll out of TMIS Standards Document (SSP 30546). The purpose of this document is to define the life cycle methodology that the developers of all products and data base applications and any subsequent modifications shall follow. Included in this methodology are descriptions of the tasks, deliverables, reviews, and approvals that are required before a product or data base application is accepted in the TMIS environment.
Fox Valley Technical Institute Economic Development Plan.
ERIC Educational Resources Information Center
Fox Valley Technical Inst., Appleton, WI.
Designed as an operating blueprint for Fox Valley Technical Institute's (FVTI's) economic development efforts, this guide incorporates the necessary operation procedures, descriptions, and resources for those involved in FVTI's effort to assist existing businesses to expand and to attract new businesses to the area. Introductory material describes…
NASA Astrophysics Data System (ADS)
Wu, Zu-guang; Tian, Zhan-jun; Liu, Hui; Huang, Rui; Zhu, Guo-hua
2009-07-01
Being the only listed telecom operators of A share market, China Unicom has always been attracted many institutional investors under the concept of 3G recent years,which itself is a great technical progress expectation.Do the institutional investors or the concept of technical progress have signficant effect on the improving of firm's operating efficiency?Though reviewing the documentary about operating efficiency we find that schoolars study this problem useing the regress analyzing based on traditional production function and data envelopment analysis(DEA) and financial index anayzing and marginal function and capital labor ratio coefficient etc. All the methods mainly based on macrodata. This paper we use the micro-data of company to evaluate the operating efficiency.Using factor analyzing based on financial index and comparing the factor score of three years from 2005 to 2007, we find that China Unicom's operating efficiency is under the averge level of benchmark corporates and has't improved under the concept of 3G from 2005 to 2007.In other words,institutional investor or the conception of technical progress expectation have faint effect on the changes of China Unicom's operating efficiency. Selecting benchmark corporates as post to evaluate the operating efficiency is a characteristic of this method ,which is basicallly sipmly and direct.This method is suit for the operation efficiency evaluation of agriculture listed companies because agriculture listed also face technical progress and marketing concept such as tax-free etc.
Heat Melt Compactor Development Progress
NASA Technical Reports Server (NTRS)
Lee, Jeffrey M.; Fisher, John W.; Pace, Gregory
2017-01-01
The status of the Heat Melt Compactor (HMC) development project is reported. HMC Generation 2 (Gen 2) has been assembled and initial testing has begun. A baseline mission use case for trash volume reduction, water recovery, trash sterilization, and the venting of effluent gases and water vapor to space has been conceptualized. A test campaign to reduce technical risks is underway. This risk reduction testing examines the many varied operating scenarios and conditions needed for processing trash during a space mission. The test results along with performance characterization of HMC Gen 2 will be used to prescribe requirements and specifications for a future ISS flight Technology Demonstration. We report on the current status, technical risks, and test results in the context of an ISS vent-to-space Technology Demonstration.
NASA Astrophysics Data System (ADS)
1982-05-01
The technical and economic feasibility of producing motor fuel alcohol from corn in a 100 million gallon per year plant to be constructed in Myrtle Grove, Louisiana is evaluated. The evaluation includes a detailed process design using proven technology, a capital cost estimate for the plant, a detailed analysis of the annual operating cost, a market study, a socioeconomic, environmental, health and safety analysis, and a complete financial analysis. Several other considerations for production of ethanol were evaluated including: cogeneration and fuel to be used in firing the boilers; single by-products vs. multiple by-products; and use of boiler flue gas for by-product drying.
Code of Federal Regulations, 2012 CFR
2012-01-01
... technical animal fats for certification and materials for use therein; removal of wrappers, etc.; cleaning... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.11 Identification and separation of technical animal fats for certification...
Code of Federal Regulations, 2010 CFR
2010-01-01
... technical animal fats for certification and materials for use therein; removal of wrappers, etc.; cleaning... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.11 Identification and separation of technical animal fats for certification...
Code of Federal Regulations, 2013 CFR
2013-01-01
... technical animal fats for certification and materials for use therein; removal of wrappers, etc.; cleaning... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.11 Identification and separation of technical animal fats for certification...
Code of Federal Regulations, 2014 CFR
2014-01-01
... technical animal fats for certification and materials for use therein; removal of wrappers, etc.; cleaning... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.11 Identification and separation of technical animal fats for certification...
Code of Federal Regulations, 2011 CFR
2011-01-01
... technical animal fats for certification and materials for use therein; removal of wrappers, etc.; cleaning... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.11 Identification and separation of technical animal fats for certification...
International Space Station Increment Operations Services
NASA Astrophysics Data System (ADS)
Michaelis, Horst; Sielaff, Christian
2002-01-01
The Industrial Operator (IO) has defined End-to-End services to perform efficiently all required operations tasks for the Manned Space Program (MSP) as agreed during the Ministerial Council in Edinburgh in November 2001. Those services are the result of a detailed task analysis based on the operations processes as derived from the Space Station Program Implementation Plans (SPIP) and defined in the Operations Processes Documents (OPD). These services are related to ISS Increment Operations and ATV Mission Operations. Each of these End-to-End services is typically characterised by the following properties: It has a clearly defined starting point, where all requirements on the end-product are fixed and associated performance metrics of the customer are well defined. It has a clearly defined ending point, when the product or service is delivered to the customer and accepted by him, according to the performance metrics defined at the start point. The implementation of the process might be restricted by external boundary conditions and constraints mutually agreed with the customer. As far as those are respected the IO has the free choice to select methods and means of implementation. The ISS Increment Operations Service (IOS) activities required for the MSP Exploitation program cover the complete increment specific cycle starting with the support to strategic planning and ending with the post increment evaluation. These activities are divided into sub-services including the following tasks: - ISS Planning Support covering the support to strategic and tactical planning up to the generation - Development &Payload Integration Support - ISS Increment Preparation - ISS Increment Execution These processes are tight together by the Increment Integration Management, which provides the planning and scheduling of all activities as well as the technical management of the overall process . The paper describes the entire End-to-End ISS Increment Operations service and the implementation to support the Columbus Flight 1E related increment and subsequent ISS increments. Special attention is paid to the implications caused by long term operations on hardware, software and operations personnel.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Michling, R.; Braun, A.; Cristescu, I.
2015-03-15
Highly tritiated water (HTW) may be generated at ITER by various processes and, due to the excessive radio toxicity, the self-radiolysis and the exceedingly corrosive property of HTW, a potential hazard is associated with its storage and process. Therefore, the capture and exchange method for HTW utilizing Molecular Sieve Beds (MSB) was investigated in view of adsorption capacity, isotopic exchange performance and process parameters. For the MSB, different types of zeolite were selected. All zeolite materials were additionally coated with platinum. The following work comprised the selection of the most efficient zeolite candidate based on detailed parametric studies during themore » H{sub 2}/D{sub 2}O laboratory scale exchange experiments (about 25 g zeolite per bed) at the Tritium Laboratory Karlsruhe (TLK). For the zeolite, characterization analytical techniques such as Infrared Spectroscopy, Thermogravimetry and online mass spectrometry were implemented. Followed by further investigation of the selected zeolite catalyst under full technical operation, a MSB (about 22 kg zeolite) was processed with hydrogen flow rates up to 60 mol*h{sup -1} and deuterated water loads up to 1.6 kg in view of later ITER processing of arising HTW. (authors)« less
Integrated Logistics Support approach: concept for the new big projects: E-ELT, SKA, CTA
NASA Astrophysics Data System (ADS)
Marchiori, G.; Rampini, F.; Formentin, F.
2014-08-01
The Integrated Logistic Support is a process supporting strategies and optimizing activities for a correct project management and system engineering development. From the design & engineering of complex technical systems, to the erection on site, acceptance and after-sales service, EIE GROUP covers all aspects of the Integrated Logistics Support (ILS) process that includes: costing process centered around the life cycle cost and Level of Repair Analyses; engineering process which influences the design via means of reliability, modularization, etc.; technical publishing process based on international specifications; ordering administration process for supply support. Through the ILS, EIE GROUP plans and directs the identification and development of logistics support and system requirements for its products, with the goal of creating systems that last longer and require less support, thereby reducing costs and increasing return on investments. ILS therefore, addresses these aspects of supportability not only during acquisition, but also throughout the operational life cycle of the system. The impact of the ILS is often measured in terms of metrics such as reliability, availability, maintainability and testability (RAMT), and System Safety (RAMS). Example of the criteria and approach adopted by EIE GROUP during the design, manufacturing and test of the ALMA European Antennas and during the design phase of the E-ELT telescope and Dome are presented.
NASA Technical Reports Server (NTRS)
Carr, Daniel; Ellenberger, Rich
2008-01-01
The Human Factors Implementation Team (HFIT) process has been used to verify human factors requirements for NASA International Space Station (ISS) payloads since 2003, resulting in $2.4 million in avoided costs. This cost benefit has been realized by greatly reducing the need to process time-consuming formal waivers (exceptions) for individual requirements violations. The HFIT team, which includes astronauts and their technical staff, acts as the single source for human factors requirements integration of payloads. HFIT has the authority to provide inputs during early design phases, thus eliminating many potential requirements violations in a cost-effective manner. In those instances where it is not economically or technically feasible to meet the precise metric of a given requirement, HFIT can work with the payload engineers to develop common sense solutions and formally document that the resulting payload design does not materially affect the astronaut s ability to operate and interact with the payload. The HFIT process is fully ISO 9000 compliant and works concurrently with NASA s formal systems engineering work flow. Due to its success with payloads, the HFIT process is being adapted and extended to ISS systems hardware. Key aspects of this process are also being considered for NASA's Space Shuttle replacement, the Crew Exploration Vehicle.
Sortie laboratory, phase B technical summary. [design and operational requirements
NASA Technical Reports Server (NTRS)
1973-01-01
The design and operational requirements which evolved from Sortie Lab (SL) analysis are summarized. A source of requirements for systems is given along with experimental support for the SL, baseline. Basic design data covered include: configuration definition, mission analysis, experimental integration, safety, and logistics. A technical summary outlines characteristics which reflect the influence of the growth in SL capability and the results of the mission and operational analysis. Each of the selected areas is described in terms of objectives, equipment, operational concept, and support requirements.
Operation Windshield and the simplification of emergency management.
Andrews, Michael
2016-01-01
Large, complex, multi-stakeholder exercises are the culmination of years of gradual progression through a comprehensive training and exercise programme. Exercises intended to validate training, refine procedures and test processes initially tested in isolation are combined to ensure seamless response and coordination during actual crises. The challenges of integrating timely and accurate situational awareness from an array of sources, including response agencies, municipal departments, partner agencies and the public, on an ever-growing range of media platforms, increase information management complexity in emergencies. Considering that many municipal emergency operations centre roles are filled by staff whose day jobs have little to do with crisis management, there is a need to simplify emergency management and make it more intuitive. North Shore Emergency Management has accepted the challenge of making emergency management less onerous to occasional practitioners through a series of initiatives aimed to build competence and confidence by making processes easier to use as well as by introducing technical tools that can simplify processes and enhance efficiencies. These efforts culminated in the full-scale earthquake exercise, Operation Windshield, which preceded the 2015 Emergency Preparedness and Business Continuity Conference in Vancouver, British Columbia.
Technical data for concentrated solar power plants in operation, under construction and in project.
Pelay, Ugo; Luo, Lingai; Fan, Yilin; Stitou, Driss; Rood, Mark
2017-08-01
This article presents technical data for concentrated solar power (CSP) plants in operation, under construction and in project all over the world in the form of tables. These tables provide information about plants (e.g., name of the CSP plant, country of construction, owner of the plant, aim of the plant) and their technical characteristics (e.g., CSP technology, solar power, area of the plant, presence and type of hybridization system, electricity cost, presence and type of TES, power cycle fluid, heat transfer fluid, operating temperature, operating pressure, type of turbine, type and duration of storage, etc.). Further interpretation of the data and discussions on the current state-of-the-art and future trends of CSP can be found in the associated research article (Pelay et al., 2017) [1].
NASA Astrophysics Data System (ADS)
Shalkov, Anton; Mamaeva, Mariya
2017-11-01
The article considers the questions of application of nondestructive methods control of reducers of conveyor belts as a means of transport. Particular attention is paid to such types of diagnostics of technical condition as thermal control and analysis of the state of lubricants. The urgency of carrying out types of nondestructive testing presented in the article is determined by the increase of energy efficiency of transport systems of coal and mining enterprises, in particular, reducers of belt conveyors. Periodic in-depth spectral-emission diagnostics and monitoring of a temperature mode of operation oil in the operation of the control equipment and its technical condition and prevent the MTBF allows the monitoring of the actual technical condition of the gearbox of a belt conveyor. In turn, the thermal imaging diagnostics reveals defects at the earliest stage of their formation and development, which allows planning the volumes and terms of equipment repair. Presents diagnostics of the technical condition will allow monitoring in time the technical condition of the equipment and avoiding its premature failure. Thereby it will increase the energy efficiency of both the transport system and the enterprise as a whole, and also avoid unreasonable increases in operating and maintenance costs.
Health regionalization in Amazonas: progress and challenges.
Garnelo, Luiza; Sousa, Amandia Braga Lima; Silva, Clayton de Oliveira da
2017-04-01
This paper analyses the health services regionalization process in the State of Amazonas through a case study covering the health sub-region Manaus Surroundings. This is a qualitative, descriptive and analytical research, which data were collected using interviews, documents and Internet reviews, oriented by the guiding concept of health regionalization. Study findings revealed a social setting dominated by asymmetry, verticality, competitiveness and fragile multilateral relations among municipalities, associated to a bureaucratic profile of local institutions operating in the region under study. The political agents have limited acknowledgement of the sociopolitical and institutional conditions in which they operate. They usually impute healthcare networks' management and operational issues to the natural and geographical characteristics of the Amazon region, but their financing, governance and technical capacity are insufficient to overcome them.
Space shuttle main engine controller
NASA Technical Reports Server (NTRS)
Mattox, R. M.; White, J. B.
1981-01-01
A technical description of the space shuttle main engine controller, which provides engine checkout prior to launch, engine control and monitoring during launch, and engine safety and monitoring in orbit, is presented. Each of the major controller subassemblies, the central processing unit, the computer interface electronics, the input electronics, the output electronics, and the power supplies are described and discussed in detail along with engine and orbiter interfaces and operational requirements. The controller represents a unique application of digital concepts, techniques, and technology in monitoring, managing, and controlling a high performance rocket engine propulsion system. The operational requirements placed on the controller, the extremely harsh operating environment to which it is exposed, and the reliability demanded, result in the most complex and rugged digital system ever designed, fabricated, and flown.
NASA Technical Reports Server (NTRS)
Paulson, R. W.
1974-01-01
The Earth Resources Technology Satellite Data Collection System has been shown to be, from the users vantage point, a reliable and simple system for collecting data from U.S. Geological Survey operational field instrumentation. It is technically feasible to expand the ERTS system into an operational polar-orbiting data collection system to gather data from the Geological Survey's Hydrologic Data Network. This could permit more efficient internal management of the Network, and could enable the Geological Survey to make data available to cooperating agencies in near-real time. The Geological Survey is conducting an analysis of the costs and benefits of satellite data-relay systems.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... Ventilation System Surveillance Requirements To Operate for 10 Hours per Month,'' Using the Consolidated Line... currently require operating the ventilation system for at least 10 continuous hours with the heaters... Technical Specifications (TSs) Task Force (TSTF) Traveler TSTF-522, Revision 0, ``Revise Ventilation System...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
... Ventilation System Surveillance Requirements to Operate for 10 hours per Month.'' DATES: Comment period....1, which currently require operating the heaters in the respective systems for at least 10... Adoption of Technical Specifications Task Force Traveler TSTF-522, Revision 0, ``Revise Ventilation System...
Mitchell, Lucy; Flin, Rhona; Yule, Steven; Mitchell, Janet; Coutts, Kathy; Youngson, George
2013-04-01
Adverse events still occur despite ongoing efforts to reduce harm to patients. Contributory factors to adverse events are often due to limitations in clinicians' non-technical skills (e.g. communication, situation awareness), rather than deficiencies in technical competence. We developed a behavioural rating system to provide a structured means for teaching and assessing scrub practitioners' (i.e. nurse, technician, operating department practitioner) non-technical skills. Psychologists facilitated focus groups (n = 4) with experienced scrub practitioners (n = 16; 4 in each group) to develop a preliminary taxonomy. Focus groups reviewed lists of non-technical-skill-related behaviours that were extracted from an interview study. The focus groups labelled skill categories and elements and also provided examples of good and poor behaviours for those skills. An expert panel (n = 2 psychologists; n = 1 expert nurse) then used an iterative process to individually and collaboratively review and refine those data to produce a prototype skills taxonomy. A preliminary taxonomy containing eight non-technical skill categories with 28 underlying elements was produced. The expert panel reduced this to three categories (situation awareness, communication and teamwork, task management), each with three underlying elements. The system was called the Scrub Practitioners' List of Intraoperative Non-Technical Skills system. A scoring system and a user handbook were also developed. A prototype behavioural rating system for scrub practitioners' non-technical skills was developed, to aid in teaching and providing formative assessment. This important aspect of performance is not currently explicitly addressed in any educational route to qualify as a scrub practitioner. © 2012 Blackwell Publishing Ltd.
DOE Coal Gasification Multi-Test Facility: fossil fuel processing technical/professional services
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hefferan, J.K.; Lee, G.Y.; Boesch, L.P.
1979-07-13
A conceptual design, including process descriptions, heat and material balances, process flow diagrams, utility requirements, schedule, capital and operating cost estimate, and alternative design considerations, is presented for the DOE Coal Gasification Multi-Test Facility (GMTF). The GMTF, an engineering scale facility, is to provide a complete plant into which different types of gasifiers and conversion/synthesis equipment can be readily integrated for testing in an operational environment at relatively low cost. The design allows for operation of several gasifiers simultaneously at a total coal throughput of 2500 tons/day; individual gasifiers operate at up to 1200 tons/day and 600 psig using airmore » or oxygen. Ten different test gasifiers can be in place at the facility, but only three can be operated at one time. The GMTF can produce a spectrum of saleable products, including low Btu, synthesis and pipeline gases, hydrogen (for fuel cells or hydrogasification), methanol, gasoline, diesel and fuel oils, organic chemicals, and electrical power (potentially). In 1979 dollars, the base facility requires a $288 million capital investment for common-use units, $193 million for four gasification units and four synthesis units, and $305 million for six years of operation. Critical reviews of detailed vendor designs are appended for a methanol synthesis unit, three entrained flow gasifiers, a fluidized bed gasifier, and a hydrogasifier/slag-bath gasifier.« less
Second Annual Workshop on Space Operations Automation and Robotics (SOAR 1988)
NASA Technical Reports Server (NTRS)
Griffin, Sandy (Editor)
1988-01-01
Papers presented at the Second Annual Workshop on Space Operation Automation and Robotics (SOAR '88), hosted by Wright State University at Dayton, Ohio, on July 20, 21, 22, and 23, 1988, are documented herein. During the 4 days, approximately 100 technical papers were presented by experts from NASA, the USAF, universities, and technical companies. Panel discussions on Human Factors, Artificial Intelligence, Robotics, and Space Systems were held but are not documented herein. Technical topics addressed included knowledge-based systems, human factors, and robotics.
Environmental Measurements Laboratory fiscal year 1998: Accomplishments and technical activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Erickson, M.D.
1999-01-01
The Environmental Measurements Laboratory (EML) is government-owned, government-operated, and programmatically under the DOE Office of Environmental Management. The Laboratory is administered by the Chicago Operations Office. EML provides program management, technical assistance and data quality assurance for measurements of radiation and radioactivity relating to environmental restoration, global nuclear nonproliferation, and other priority issues for the Department of Energy, as well as for other government, national, and international organizations. This report presents the technical activities and accomplishments of EML for Fiscal Year 1998.
International online support to process optimisation and operation decisions.
Onnerth, T B; Eriksson, J
2002-01-01
The information level at all technical facilities has developed from almost nothing 30-40 years ago to advanced IT--Information Technology--systems based on both chemical and mechanical on-line sensors for process and equipment. Still the basic part of information is to get the right data at the right time for the decision to be made. Today a large amount of operational data is available at almost any European wastewater treatment plant, from laboratory and SCADA. The difficult part is to determine which data to keep, which to use in calculations and how and where to make data available. With the STARcontrol system it is possible to separate only process relevant data to use for on-line control and reporting at engineering level, to optimise operation. Furthermore, the use of IT makes it possible to communicate internationally, with full access to the whole amount of data on the single plant. In this way, expert supervision can be both very local in local language e.g. Polish and at the same time very professional with Danish experts advising on Danish processes in Poland or Sweden where some of the 12 STARcontrol systems are running.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ainsworth, Nathan; Heaps, Colton; Symko-Davies, Martha
The purpose of this report is to propose a technical roadmap for power supply technology to power the Tactical Assault Light Operator Suit (TALOS), an armored, powered exoskeleton currently in development for U.S. Special Operations Command operators. TALOS' power supply system must meet size targets similar to the size of a large backpack while providing significant electrical power for an entire mission cycle without resupply. This report proposes a staged development path based on three fundamental technical approaches.
NASA Astrophysics Data System (ADS)
Cahuzac, Francois
2010-09-01
This publication provides a presentation of the new French Space Operation Act(hereafter FSOA). The main objectives of FSOA are to institute a clarified legal regime for launch operations. The technical regulation associated to the act is set forth, in particular for the safety of persons and property, the protection of public health and the environment. First, we give an overview of the institutional and legal framework implemented in accordance with the act. The general purpose of this French Space Operation Act(hereafter FSOA) is to set up a coherent national regime of authorization and control of Space operations under the French jurisdiction or for which the French Government bears international liability either under UN Treaties principles(namely the 1967 Outer Space Treaty, the 1972 Liability Convention and the 1976 Registration Convention) or in accordance with its European commitments with the ESA organization and its Members States. For a given space operation, the operator must show that systems and procedures that he intends to implement are compliant with the technical regulation. The regime of authorization leads to a request of authorization for each launch operation. Thus, licences concerning operator management organization or a given space system can be obtained. These licences help to simplify the authorization file required for a given space operation. The technical regulation is presented in another article, and will be issued in 2010 by the French Minister in charge of space activities. A brief description of the organization associated to the implementation of the authorization regime in the launcher field is presented.
Demonstration of the waste tire pyrolysis process on pilot scale in a continuous auger reactor.
Martínez, Juan Daniel; Murillo, Ramón; García, Tomás; Veses, Alberto
2013-10-15
This work shows the technical feasibility for valorizing waste tires by pyrolysis using a pilot scale facility with a nominal capacity of 150 kWth. A continuous auger reactor was operated to perform thirteen independent experiments that conducted to the processing of more than 500 kg of shredded waste tires in 100 h of operation. The reaction temperature was 550°C and the pressure was 1 bar in all the runs. Under these conditions, yields to solid, liquid and gas were 40.5 ± 0.3, 42.6 ± 0.1 and 16.9 ± 0.3 wt.% respectively. Ultimate and proximate analyses as well as heating value analysis were conducted for both the solid and liquid fraction. pH, water content, total acid number (TAN), viscosity and density were also assessed for the liquid and compared to the specifications of marine fuels (standard ISO 8217). Gas chromatography was used to calculate the composition of the gaseous fraction. It was observed that all these properties remained practically invariable along the experiments without any significant technical problem. In addition, the reaction enthalpy necessary to perform the waste tire pyrolysis process (907.1 ± 40.0 kJ/kg) was determined from the combustion and formation enthalpies of waste tire and conversion products. Finally, a mass balance closure was performed showing an excellent reliability of the data obtained from the experimental campaign. Copyright © 2013 Elsevier B.V. All rights reserved.
Efficiency Management in Spaceflight Systems
NASA Technical Reports Server (NTRS)
Murphy, Karen
2016-01-01
Efficiency in spaceflight is often approached as “faster, better, cheaper – pick two”. The high levels of performance and reliability required for each mission suggest that planners can only control for two of the three. True efficiency comes by optimizing a system across all three parameters. The functional processes of spaceflight become technical requirements on three operational groups during mission planning: payload, vehicle, and launch operations. Given the interrelationships among the functions performed by the operational groups, optimizing function resources from one operational group to the others affects the efficiency of those groups and therefore the mission overall. This paper helps outline this framework and creates a context in which to understand the effects of resource trades on the overall system, improving the efficiency of the operational groups and the mission as a whole. This allows insight into and optimization of the controlling factors earlier in the mission planning stage.
NASA Astrophysics Data System (ADS)
Podimata, Marianthi V.; Yannopoulos, Panayotis C.
2015-04-01
Water managers, decision-makers, water practitioners and others involved in Integrated Water Resources Management often encounter the problem of finding a joint agreement among stakeholders concerning the management of a common water body. Handling conflict situations/disputes over water issues and finding an acceptable joint solution remain a thorny issue in water negotiation processes, since finding a formula for wise, fair and sustainable management of a water resource is a complex process that includes environmental, economic, technical, socio-political criteria and their uncertainties. Decision Support Systems and Adaptive Management are increasingly used in that direction. To assist decision makers in handling water disputes and execute negotiations, a conceptual tool is required. The Graph Model for Conflict Resolution is a Decision Support flexible tool for negotiation support regarding water conflicts. It includes efficient algorithms for estimating strategic moves of water stakeholders, even though there is a lack of detail concerning their real motives and prospects. It calculates the stability of their states and encourages what-if analyses. This paper presents a case study of water decision makers' evaluations concerning the management of up-coming technical infrastructure Peiros-Parapeiros Dam, in Achaia Region (Greece). The continuous consultations between institutions and representatives revealed that the formation of a joint agreement between stakeholders is not easy, due to arising conflicts and contradictions regarding the jurisdiction and legal status of the dam operator and the cost undertaking of the dam operation. This paper analyzes the positions of the parties involved in the consultation process and examines possible conflict resolution states, using GMCR II. This methodology tries to minimize uncertainty to a certain extent concerning the possible moves/decisions of involved parties regarding the operation and management of the dam by developing and simulating potential strategic interactions and multilateral negotiations and finding confidence-building cooperation schemes (cooperative arrangements) over water use and management.
76 FR 72902 - Materials Processing Equipment Technical Advisory Committee;
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-28
... DEPARTMENT OF COMMERCE Bureau of Industry and Security Materials Processing Equipment Technical Advisory Committee; Notice of Partially Closed Meeting The Materials Processing Equipment Technical... questions that affect the level of export controls applicable to materials processing equipment and related...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, K.D.
2006-07-01
Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering to management and technical strategies during the dismantlement, decontamination, and demolition of Building JN-1 enabled Closure Services to achieve strong ALARA performance, maintain absolute compliance under the regulatory requirements and meeting licensing conditions for decommissioning. (authors)« less
Rahimi, Sayed Ali; Pourkaveh, Maryam
2016-02-01
To present the results of occupational radiation doses investigated through a Hospitals of Mazandaran Medical Science Universities in north of Iran. Radiology unit has an important role in diagnosis of many disorders with providing suitable and high quality pictures. A good picture was provided using correct technical criteria and suitable circumstance of patient. Finally, operation and knowledge of radiology personnel directly has a primary role in determining quality of radiography. This study was done in order to determine personnel operation in the units of hospitals radiologist related to University of Mazandaran Medical Science. Data collection tools are made of a researcher check list that was used after obtaining suitable letter and validity indexes. All of the 73 personnel of radiology unit related to Mazandaran Medical Science were studied. 35 operations (in technical, protective and technological fields) of any personnel, in three distinct shifts were observed and recorded. All of them were tested regarding these three fields with a total of 40 questions. The total scores received from personnel in technical part in the morning, evening and night shift were 66.4, 53.9 and 60.2 percent respectively. Received scores from personnel in the protective fields were 68.1, 59.5 and 60.2 percent. Moreover, received scores from personnel in the technological operation fields were 47.8, 39.95 and 43.65 percent respectively. Comparison of these three scores in technical, protective and technological operation fields showed a meaningful difference (p<0.05). The overall quality of personnel operations were nearly desirable and in need of continuous education, supervision and evaluation. Emphasizing protection to beams, accessibility of necessary tools, continuous supervision regarding the usage of these equipments and respecting the other security points have an important role in decreasing patients absorbed doses.
Ontogeny of a surgical technique: Robotic kidney transplantation with regional hypothermia.
Sood, Akshay; McCulloch, Peter; Dahm, Philipp; Ahlawat, Rajesh; Jeong, Wooju; Bhandari, Mahendra; Menon, Mani
2016-01-01
Innovation is a hallmark of surgical practice. It is generally accepted that a new procedure will undergo technical changes during its evolution; however, quantitative accounts of the process are limited. Multiple groups, including our own, have recently described a minimally-invasive approach to conventional kidney transplantation (KT) operation. Unique to our experience is a structured development of the technique within the confines of a safe surgical innovation framework - the IDEAL framework (idea, development, exploration, assessment, long-term monitoring; stages 0-4). We here provide a first-hand narrative of the progress of robotic KT operation from preclinical trial to clinical application. Overall, 54 patients underwent robotic KT with regional hypothermia successfully. Major technical changes including selection of optimal patient position (flank vs. lithotomy), robotic instrumentation, vascular occlusion method (bulldog vs. tourniquet) and suture material (prolene vs. GoreTex) occurred early during the procedure development (IDEAL stage 0, preclinical). Minor technical changes such as utilization of the aortic punch for arteriotomy (case 3), use of barbed suture during ureteroneocystostomy (case 6) and extraperitonealization of the graft kidney (case 6) that increased the efficiency and safety of the procedure continued throughout procedure development (IDEAL stages 1-2, clinical stages). We demonstrate that a surgical technique evolves continually; although, the majority of technical alterations occur early in the life-cycle of the procedure. Development of a new technique within the confines a structured surgical innovation framework allows for evidence based progression of the technique and may minimize the risk of harm to the patient. Copyright © 2015 IJS Publishing Group Limited. Published by Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Wehn, Uta; Joshi, Somya; Pfeiffer, Ellen; Anema, Kim; Gharesifard, Mohammad; Momani, Abeer
2017-04-01
Owing to ICT-enabled citizen observatories, citizens can take on new roles in environmental monitoring, decision making and co-operative planning, and environmental stewardship. And yet implementing advanced citizen observatories for data collection, knowledge exchange and interactions to support policy objectives is neither always easy nor successful, given the required commitment, trust, and data reliability concerns. Many efforts are facing problems with the uptake and sustained engagement by citizens, limited scalability, unclear long-term sustainability and limited actual impact on governance processes. Similarly, to sustain the engagement of decision makers in citizen observatories, mechanisms are required from the start of the initiative in order to have them invest in and, hence, commit to and own the entire process. In order to implement sustainable citizen observatories, these social dimensions therefore need to be soundly managed. We provide empirical evidence of how the social dimensions of citizen observatories are being addressed in the Ground Truth 2.0 project, drawing on a range of relevant social science approaches. This project combines the social dimensions of citizen observatories with enabling technologies - via a socio-technical approach - so that their customisation and deployment is tailored to the envisaged societal and economic impacts of the observatories. The projects consists of the demonstration and validation of six scaled up citizen observatories in real operational conditions both in the EU and in Africa, with a specific focus on flora and fauna as well as water availability and water quality for land and natural resources management. The demonstration cases (4 EU and 2 African) cover the full 'spectrum' of citizen-sensed data usage and citizen engagement, and therefore allow testing and validation of the socio-technical concept for citizen observatories under a range of conditions.
Adaptation of non-technical skills behavioural markers for delivery room simulation.
Bracco, Fabrizio; Masini, Michele; De Tonetti, Gabriele; Brogioni, Francesca; Amidani, Arianna; Monichino, Sara; Maltoni, Alessandra; Dato, Andrea; Grattarola, Claudia; Cordone, Massimo; Torre, Giancarlo; Launo, Claudio; Chiorri, Carlo; Celleno, Danilo
2017-03-17
Simulation in healthcare has proved to be a useful method in improving skills and increasing the safety of clinical operations. The debriefing session, after the simulated scenario, is the core of the simulation, since it allows participants to integrate the experience with the theoretical frameworks and the procedural guidelines. There is consistent evidence for the relevance of non-technical skills (NTS) for the safe and efficient accomplishment of operations. However, the observation, assessment and feedback on these skills is particularly complex, because the process needs expert observers and the feedback is often provided in judgmental and ineffective ways. The aim of this study was therefore to develop and test a set of observation and rating forms for the NTS behavioural markers of multi-professional teams involved in delivery room emergency simulations (MINTS-DR, Multi-professional Inventory for Non-Technical Skills in the Delivery Room). The MINTS-DR was developed by adapting the existing tools and, when needed, by designing new tools according to the literature. We followed a bottom-up process accompanied by interviews and co-design between practitioners and psychology experts. The forms were specific for anaesthetists, gynaecologists, nurses/midwives, assistants, plus a global team assessment tool. We administered the tools in five editions of a simulation training course that involved 48 practitioners. Ratings on usability and usefulness were collected. The mean ratings of the usability and usefulness of the tools were not statistically different to or higher than 4 on a 5-point rating scale. In either case no significant differences were found across professional categories. The MINTS-DR is quick and easy to administer. It is judged to be a useful asset in maximising the learning experience that is provided by the simulation.
Skill, Judgement and Conduct for the First Generation of Neurosurgeons, 1900-1930.
Gavrus, Delia
2015-07-01
Historical contingency complicates a reading of skill as a self-explanatory and always positive attribute. By focusing on the attempts of the first generation of neurosurgeons to build a community and fashion a collective neurosurgical self, this article highlights the extent to which the relationship between surgical skill and professional judgement is reflected in broader concerns that shape the landscape of medicine at a given time. Some early twentieth-century surgeons expressed concern about the spectacularisation of surgery and the skilful but problematic work of 'brilliant operators'. The neurosurgeons' policies of inclusion and exclusion show that in the process of fashioning a neurosurgical persona, this first generation sanctioned specific norms of conduct underwritten by similar moral imperatives, such as self-control. These norms governed the doctors' work both in the operating room and on the public stage (in their engagement with the press). The meetings of the first neurosurgical society staged a critical encounter between the host neurosurgeon and the members who watched him perform surgery. These technical performances in the operating theatre, followed by discussions, were designed to encourage particular norms, to negotiate surgical knowledge, and to demonstrate the skills and character of the neurosurgeon. The performances acted as a technology of the self that aligned the operator to a community and helped that community refine its norms of surgical conduct. The awkward surgeon with inferior technical ability was preferable to the brilliant but vain operator who lacked the capacity to judge when he should not deploy his spectacular skills.
Human factors in surgery: from Three Mile Island to the operating room.
D'Addessi, Alessandro; Bongiovanni, Luca; Volpe, Andrea; Pinto, Francesco; Bassi, PierFrancesco
2009-01-01
Human factors is a definition that includes the science of understanding the properties of human capability, the application of this understanding to the design and development of systems and services, the art of ensuring their successful applications to a program. The field of human factors traces its origins to the Second World War, but Three Mile Island has been the best example of how groups of people react and make decisions under stress: this nuclear accident was exacerbated by wrong decisions made because the operators were overwhelmed with irrelevant, misleading or incorrect information. Errors and their nature are the same in all human activities. The predisposition for error is so intrinsic to human nature that scientifically it is best considered as inherently biologic. The causes of error in medical care may not be easily generalized. Surgery differs in important ways: most errors occur in the operating room and are technical in nature. Commonly, surgical error has been thought of as the consequence of lack of skill or ability, and is the result of thoughtless actions. Moreover the 'operating theatre' has a unique set of team dynamics: professionals from multiple disciplines are required to work in a closely coordinated fashion. This complex environment provides multiple opportunities for unclear communication, clashing motivations, errors arising not from technical incompetence but from poor interpersonal skills. Surgeons have to work closely with human factors specialists in future studies. By improving processes already in place in many operating rooms, safety will be enhanced and quality increased.
Robertson, Eleanor; Morgan, Lauren; New, Steve; Pickering, Sharon; Hadi, Mohammed; Collins, Gary; Rivero Arias, Oliver; Griffin, Damian; McCulloch, Peter
2015-01-01
Background To investigate the effectiveness of combining teamwork training and lean process improvement, two distinct approaches to improving surgical safety. We conducted a controlled interrupted time series study in a specialist UK Orthopaedic hospital incorporating a plastic surgery team (which received the intervention) and an Orthopaedic theatre team acting as a control. Study Design We used a 3 month intervention with 3 months data collection period before and after it. A combined teamwork training and lean process improvement intervention was delivered by an experienced specialist team. Before and after the intervention we evaluated team non-technical skills using NOTECHS II, technical performance using the glitch rate and WHO checklist compliance using a simple 3 point scale. We recorded complication rate, readmission rate and length of hospital stay data for 6 months before and after the intervention. Results In the active group, but not the control group, full compliance with WHO Time Out (T/O) increased from 14 to 71% (p = 0.032), Sign Out attempt rate (S/O) increased from 0% to 50% (p<0.001) and Oxford NOTECHS II scores increased after the intervention (P = 0.058). Glitch rate decreased in the active group and increased in the control group (p = 0.001). Complications and length of stay appeared to rise in the control group and fall in the active group. Conclusions Combining teamwork training and systems improvement enhanced both technical and non-technical operating team process measures, and were associated with a trend to better safety outcome measures in a controlled study comparison. We suggest that approaches which address both system and culture dimensions of safety may prove valuable in reducing risks to patients. PMID:26381643
Operator Performance Support System (OPSS)
NASA Technical Reports Server (NTRS)
Conklin, Marlen Z.
1993-01-01
In the complex and fast reaction world of military operations, present technologies, combined with tactical situations, have flooded the operator with assorted information that he is expected to process instantly. As technologies progress, this flow of data and information have both guided and overwhelmed the operator. However, the technologies that have confounded many operators today can be used to assist him -- thus the Operator Performance Support Team. In this paper we propose an operator support station that incorporates the elements of Video and Image Databases, productivity Software, Interactive Computer Based Training, Hypertext/Hypermedia Databases, Expert Programs, and Human Factors Engineering. The Operator Performance Support System will provide the operator with an integrating on-line information/knowledge system that will guide expert or novice to correct systems operations. Although the OPSS is being developed for the Navy, the performance of the workforce in today's competitive industry is of major concern. The concepts presented in this paper which address ASW systems software design issues are also directly applicable to industry. the OPSS will propose practical applications in how to more closely align the relationships between technical knowledge and equipment operator performance.
Factors that influence the non-technical skills performance of scrub nurses: a prospective study.
Kang, Evelyn; Massey, Debbie; Gillespie, Brigid M
2015-12-01
To identify and describe the factors that impact on the performance of scrub nurses' non-technical skills performance during the intra-operative phase of surgery. Non-technical skills have been identified as important precursors to errors in the operating room. However, few studies have investigated factors influencing non-technical skills of scrub nurses. Prospective observational study. Structured observations were performed on a sample of 182 surgical procedures across eight specialities by two trained observers from August 2012-April 2013 at two hospital sites. Participants were purposively selected scrub nurses. Bivariate correlations and a multiple linear regression model were used to identify associations among length of surgery, patients' acuity using the American Society of Anesthesiologists classification system, team familiarity, number of occasions scout nurses leave the operating room, change of scout nurse and the outcome, the non-technical skills performance of scrub nurses. Patient acuity and team familiarity were the strongest predictors of scrub nurses' non-technical skills performance at hospital site A. There were no correlations between the predictors and the performance of scrub nurses at hospital site B. A dedicated surgical team and patient acuity potentially influence the performance of scrub nurses' non-technical skills. Familiarity with team members foster advanced planning, thus minimizing distractions and interruptions that impact on scrub nurses' performance. Development of interventions aimed at improving non-technical skills has the potential to make a substantial difference and enhance patient care. © 2015 John Wiley & Sons Ltd.
ITS/CVO technical project management for non-technical managers : participant guide
DOT National Transportation Integrated Search
1998-09-01
In 1996, the FHWA Office of Motor Carriers (OMC) identified the need to develop a Technical Training Program to support the deployment of Intelligent Transportation System (ITS) technologies for Commercial Vehicle Operations (CVO). The workforce -...
Principles and Procedures in Technical Assistance: An Approach to Educational Change
ERIC Educational Resources Information Center
Lillie, David L.; Black, Talbot
1976-01-01
The Technical Assistance Development System (TADS) has developed through the years a system for technical assistance and has identified some important principles that should be followed in the operation of organizational support systems. (Author/ER)
NASA Technical Reports Server (NTRS)
Ballard, RIchard O.
2006-01-01
This paper is a summary overview of a study conducted at the NASA Marshall Space Flight Center (NASA MSFC) during the initial phases of the Space Launch Initiative (SLI) program to evaluate a large number of technical problems associated with the design, development, test, evaluation and operation of several major liquid propellant rocket engine systems (i.e., SSME, Fastrac, J-2, F-1). One of the primary results of this study was the identification of the Fundamental Root Causes that enabled the technical problems to manifest, and practices that can be implemented to prevent them from recurring in future propulsion system development efforts, such as that which is currently envisioned in the field of nuclear thermal propulsion (NTF). This paper will discuss the Fundamental Root Causes, cite some examples of how the technical problems arose from them, and provide a discussion of how they can be mitigated or avoided in the development of an NTP system
Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne; Honma, George
This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less
Technology transfer and commercialization initiatives at TRI/Austin: Resources and examples
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matzkanin, G.A.; Dingus, M.L.
1995-12-31
Located at TRI/Austin, and operated under a Department of Defense contract, is the Nondestructive Testing Information Analysis Center (NTIAC). This is a full service Information Analysis Center sponsored by the Defense Technical Information Center (DTIC), although services of NTIAC are available to other government agencies, government contractors, industry and academia. The principal objective of NTIAC is to help increase the productivity of the nation`s scientists, engineers, and technical managers involved in, or requiring, nondestructive testing by providing broad information analysis services of technical excellence. TRI/Austin is actively pursuing commercialization of several products based on results from outside funded R andmore » D programs. As a small business, TRI/Austin has limited capabilities for large scale fabrication, production, marketing or distribution. Thus, part of a successful commercialization process involves making appropriate collaboration arrangements with other organizations to augment TRI/Austin`s capabilities. Brief descriptions are given here of two recent commercialization efforts at TRI/Austin.« less
An Airborne Communications Roadmap for the U.S. Federal Air Marshal Service: Overview and Status
NASA Technical Reports Server (NTRS)
Martzaklis, Konstantinos S.
2007-01-01
Following the events of September 11, 2001, the responsibilities, operations and numbers of the U.S. Federal Air Marshal Service (FAMS) wer e greatly expanded. With this expansion, new critical research and te chnology needs were identified, including the need for air to ground telecommunications capabilities. To address this need, the FAMS has cr eated a working group to develop, deploy and enhance aviation communi cations with respect to security and law enforcement. This paper presents the working group's progress to date in generating a FAMS air-gro und communications roadmap identifying expected communications servic es, technology maturity, and technology gaps over a timeline. The paper includes a communications preliminary requirements summary and syst em performance characteristics needed to meet identified operational needs. The system engineering process utilized is presented beginning with the identification of users, their operational needs and relevant constraints. The operational needs are translated to desired airbor ne communications services. System technical performance requirements associated with the identified services are summarized. In addition, notional communications architectures addressing the requirements are presented. Finally, future plans to identify and assess potential ca ndidate systems and their associated technical architectures, gaps and barriers to implementation are discussed. The paper addresses the cu rrent, near term (within 5 years) and far term (10 years) timeframes for such an airborne communications system.
NASA Technical Reports Server (NTRS)
Patterson, Linda P.
2001-01-01
The International Space Station (ISS) has an operational mission and profile that makes it a Logistics and Maintenance (L&M) support challenge different from previous programs. It is permanently manned, assembled on orbit, and multi-national. With this technical and operational challenge, a unique approach is needed to support the hardware and crew. The key is the integration of on-orbit and ground analysis, supply, maintenance, and crew training into a coherent functional process that supports ISS goals and objectives. To integrate all the necessary aspects of hardware and personnel to support on-orbit maintenance, a myriad of products and processes must be created and coordinated, such that the right resources are in the right place at the right time to ensure continued ISS functionality. This paper will familiarize the audience with ISS On-Orbit Maintenance (OOM) concepts and capabilities for different maintenance tasks and discuss some of the logic behind their selection. It will also identify the operational maintenance support responsibility split between the U.S. and the various International Partners (IPs).
Processing and Applications of Depleted Uranium Alloy Products
1976-09-01
temperal,,r at the wheel-metal interface, thus tending to produce surface cracks and in some cases to burn the metal. Data on speeds and feeds inr...comprehensive current resource of technical information on the development and utilization of advcnlod metal- or ceramic-base materials. The Center is operated...under the sponsorship of the Department of Defense. Neither the United Staxes Government nor any person acting on be ilf of the United States Government
MPT_DOE Final Report 12-15-16 rev1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bunce, Michael
The goal of this project was to achieve breakthrough thermal efficiency on a light duty passenger car engine, with minimal impact to emissions. The enabling technology or technologies were to be relatively low cost and integrateable into existing production processes. Through the use of Turbulent Jet Ignition (TJI), an enabling technology for ultra-lean engine operation, the project team was able to meet or exceed all technical goals of this program.
Method to Select Technical Terms for Glossaries in Support of Joint Task Force Operations
2012-01-01
have been prohibitively time-consuming. Instead, we identified two publicly available terminology extractor tools: TerMine (NaCTEM, 2011) and Alchemy ...and that from the latter, by high recall. The Alchemy approach contrasts with that used in TerMine in that Alchemy will process the text with...information categories, such as person, location, and organization, in addition to returning topic keywords. Output from both TerMine and Alchemy
Technical Performance Measures and Distributed-Simulation Training Systems
2000-01-01
and Salas (1995) indicate that “ free play ” training exercises Acquisition Review Quarterly—Winter 2000 24 “The use of both process measures to...performance change from training period to training period, whereas the alternative to “ free play ”—a structured exercise—was expensive to build and...semiautomated-force operators used their “ free play ” prerogative in the second run. Specifically, units typically train against a lesser able opposing force
NASA Technical Reports Server (NTRS)
1975-01-01
Experiment hardware and operational requirements for space shuttle experiments are discussed along with payload and system concepts. Appendixes are included in which experiment data sheets, chamber environmental control and monitoring, method for collection and storage of electrophoretically-separated samples, preliminary thermal evaluation of electromagnetic levitation facilities L1, L2, and L3, and applicable industrial automation equipment are discussed.
Integrated intelligent systems in advanced reactor control rooms
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beckmeyer, R.R.
1989-01-01
An intelligent, reactor control room, information system is designed to be an integral part of an advanced control room and will assist the reactor operator's decision making process by continuously monitoring the current plant state and providing recommended operator actions to improve that state. This intelligent system is an integral part of, as well as an extension to, the plant protection and control systems. This paper describes the interaction of several functional components (intelligent information data display, technical specifications monitoring, and dynamic procedures) of the overall system and the artificial intelligence laboratory environment assembled for testing the prototype. 10 refs.,more » 5 figs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Espinosa, R.; Maldonado, O.; Menchu, J.F.
1977-01-01
An evaluation is made of the pilot plant studies on the biosynthesis of Verticillium sp. both on coffee waste waters and blackstrap molasses. The purpose of the study was two-fold: the first to produce a filamentous fungi as a source of protein and the second to alleviate the serious water pollution resulting from the processing of coffee berries. The molasses was studied as an alternative medium to enable year-round operation of the plant since coffee is a seasonal crop. The results indicated that the growth of Verticillium is technically feasible in a batch operation. (JSR)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cole, Charles R.; Bergeron, Marcel P.; Wurstner, Signe K.
2001-05-31
This report describes a new initiative to strengthen the technical defensibility of predictions made with the Hanford site-wide groundwater flow and transport model. The focus is on characterizing major uncertainties in the current model. PNNL will develop and implement a calibration approach and methodology that can be used to evaluate alternative conceptual models of the Hanford aquifer system. The calibration process will involve a three-dimensional transient inverse calibration of each numerical model to historical observations of hydraulic and water quality impacts to the unconfined aquifer system from Hanford operations since the mid-1940s.