Sample records for process vessel vent

  1. 40 CFR 63.115 - Process vent provisions-methods and procedures for process vent group determination.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... accepted chemical engineering principles, measurable process parameters, or physical or chemical laws or... From the Synthetic Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer... (d)(3) of this section. (1) Engineering assessment may be used to determine vent stream flow rate...

  2. 40 CFR 63.115 - Process vent provisions-methods and procedures for process vent group determination.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... accepted chemical engineering principles, measurable process parameters, or physical or chemical laws or... From the Synthetic Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer... (d)(3) of this section. (1) Engineering assessment may be used to determine vent stream flow rate...

  3. 40 CFR 63.115 - Process vent provisions-methods and procedures for process vent group determination.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... accepted chemical engineering principles, measurable process parameters, or physical or chemical laws or... From the Synthetic Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer... (d)(3) of this section. (1) Engineering assessment may be used to determine vent stream flow rate...

  4. 40 CFR 63.115 - Process vent provisions-methods and procedures for process vent group determination.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... accepted chemical engineering principles, measurable process parameters, or physical or chemical laws or... From the Synthetic Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer... (d)(3) of this section. (1) Engineering assessment may be used to determine vent stream flow rate...

  5. 40 CFR 63.110 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.110 Applicability. (a) This subpart applies to all process vents, storage vessels, transfer racks, wastewater streams, and in-process..., subpart III, NNN, or RRR, as applicable. (e) Overlap with other regulations for wastewater. (1) After the...

  6. 40 CFR 63.110 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.110 Applicability. (a) This subpart applies to all process vents, storage vessels, transfer racks, wastewater streams, and in-process..., subpart III, NNN, or RRR, as applicable. (e) Overlap with other regulations for wastewater. (1) After the...

  7. 40 CFR 65.143 - Closed vent systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... storage vessel, process vent, transfer rack, or equipment leaks. (1) Collection of emissions. Each closed... material from a storage vessel, transfer rack or equipment leaks. Inspection records shall be generated as... (B) Conduct annual visual inspections for visible, audible, or olfactory indications of leaks. (ii...

  8. 40 CFR 63.117 - Process vent provisions-reporting and recordkeeping requirements for group and TRE determinations...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.117 Process vent provisions—reporting... incinerators, boilers or process heaters specified in table 3 of this subpart, and averaged over the same time... content determinations, flow rate measurements, and exit velocity determinations made during the...

  9. 40 CFR 63.117 - Process vent provisions-reporting and recordkeeping requirements for group and TRE determinations...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.117 Process vent provisions—reporting... incinerators, boilers or process heaters specified in table 3 of this subpart, and averaged over the same time... content determinations, flow rate measurements, and exit velocity determinations made during the...

  10. 40 CFR 63.122 - Storage vessel provisions-reporting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Storage vessel provisions-reporting. 63... for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.122 Storage vessel provisions—reporting. (a) For each Group 1 storage vessel, the owner or operator shall comply with the...

  11. 40 CFR 63.123 - Storage vessel provisions-recordkeeping.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 10 2014-07-01 2014-07-01 false Storage vessel provisions... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.123 Storage vessel provisions—recordkeeping. (a) Each owner or operator of a Group 1 or Group 2 storage vessel shall...

  12. 40 CFR 63.122 - Storage vessel provisions-reporting.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 10 2014-07-01 2014-07-01 false Storage vessel provisions-reporting... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.122 Storage vessel provisions—reporting. (a) For each Group 1 storage vessel, the owner or operator shall comply with...

  13. 40 CFR 63.123 - Storage vessel provisions-recordkeeping.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Storage vessel provisions-recordkeeping... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.123 Storage vessel provisions—recordkeeping. (a) Each owner or operator of a Group 1 or Group 2 storage vessel shall...

  14. 40 CFR 63.122 - Storage vessel provisions-reporting.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Storage vessel provisions-reporting. 63... for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.122 Storage vessel provisions—reporting. (a) For each Group 1 storage vessel, the owner or operator shall comply with the...

  15. 40 CFR 63.123 - Storage vessel provisions-recordkeeping.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Storage vessel provisions... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.123 Storage vessel provisions—recordkeeping. (a) Each owner or operator of a Group 1 or Group 2 storage vessel shall...

  16. 40 CFR 63.123 - Storage vessel provisions-recordkeeping.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Storage vessel provisions-recordkeeping... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.123 Storage vessel provisions—recordkeeping. (a) Each owner or operator of a Group 1 or Group 2 storage vessel shall...

  17. 40 CFR 63.122 - Storage vessel provisions-reporting.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Storage vessel provisions-reporting... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.122 Storage vessel provisions—reporting. (a) For each Group 1 storage vessel, the owner or operator shall comply with...

  18. 40 CFR 63.121 - Storage vessel provisions-alternative means of emission limitation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and... account for other emission variables such as temperature and barometric pressure, or (2) An engineering...

  19. 40 CFR 63.121 - Storage vessel provisions-alternative means of emission limitation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and... account for other emission variables such as temperature and barometric pressure, or (2) An engineering...

  20. 40 CFR 63.121 - Storage vessel provisions-alternative means of emission limitation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and... account for other emission variables such as temperature and barometric pressure, or (2) An engineering...

  1. 40 CFR 63.121 - Storage vessel provisions-alternative means of emission limitation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and... account for other emission variables such as temperature and barometric pressure, or (2) An engineering...

  2. 40 CFR 63.121 - Storage vessel provisions-alternative means of emission limitation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and... account for other emission variables such as temperature and barometric pressure, or (2) An engineering...

  3. 40 CFR 63.120 - Storage vessel provisions-procedures to determine compliance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and...) each time the storage vessel is emptied and degassed, and at least once every 10 years after the... (if any) each time the storage vessel is emptied and degassed and at least once every 5 years after...

  4. 40 CFR 63.120 - Storage vessel provisions-procedures to determine compliance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and...) each time the storage vessel is emptied and degassed, and at least once every 10 years after the... (if any) each time the storage vessel is emptied and degassed and at least once every 5 years after...

  5. 40 CFR 63.120 - Storage vessel provisions-procedures to determine compliance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and...) each time the storage vessel is emptied and degassed, and at least once every 10 years after the... (if any) each time the storage vessel is emptied and degassed and at least once every 5 years after...

  6. 40 CFR 63.120 - Storage vessel provisions-procedures to determine compliance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater... time the storage vessel is emptied and degassed, and at least once every 10 years after the compliance... (if any) each time the storage vessel is emptied and degassed and at least once every 5 years after...

  7. 40 CFR 63.1332 - Emissions averaging provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... other controls for a Group 1 storage vessel, batch process vent, aggregate batch vent stream, continuous... in control after November 15, 1990. (2) Group 1 emission points, identified in paragraph (c)(3) of... applicable reference control technology or standard and the emissions allowed for the Group 1 emission point...

  8. 40 CFR 63.1332 - Emissions averaging provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... other controls for a Group 1 storage vessel, batch process vent, aggregate batch vent stream, continuous... in control after November 15, 1990. (2) Group 1 emission points, identified in paragraph (c)(3) of... reference control technology or standard and the emissions allowed for the Group 1 emission point. Said...

  9. 40 CFR Table 3 to Subpart G of... - Process Vents-Monitoring, Recordkeeping, and Reporting Requirements for Complying With 98 Weight...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Air Pollutants Emissions or a Limit of 20 Parts Per Million by Volume 3 Table 3 to Subpart G of Part... Process Vents, Storage Vessels, Transfer Operations, and Wastewater Pt. 63, Subpt. G, Table 3 Table 3 to.... Recapture devices The appropriate monitoring device identified in table 4 when, in the table, the term...

  10. 40 CFR Table 3 to Subpart G of... - Process Vents-Monitoring, Recordkeeping, and Reporting Requirements for Complying With 98 Weight...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Air Pollutants Emissions or a Limit of 20 Parts Per Million by Volume 3 Table 3 to Subpart G of Part... Process Vents, Storage Vessels, Transfer Operations, and Wastewater Pt. 63, Subpt. G, Table 3 Table 3 to.... Recapture devices The appropriate monitoring device identified in table 4 when, in the table, the term...

  11. 40 CFR Table 3 to Subpart G of... - Process Vents-Monitoring, Recordkeeping, and Reporting Requirements for Complying With 98 Weight...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Hazardous Air Pollutants Emissions or a Limit of 20 Parts Per Million by Volume 3 Table 3 to Subpart G of... Process Vents, Storage Vessels, Transfer Operations, and Wastewater Pt. 63, Subpt. G, Table 3 Table 3 to.... Recapture devices The appropriate monitoring device identified in table 4 when, in the table, the term...

  12. 40 CFR Table 3 to Subpart G of... - Process Vents-Monitoring, Recordkeeping, and Reporting Requirements for Complying With 98 Weight...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Hazardous Air Pollutants Emissions or a Limit of 20 Parts Per Million by Volume 3 Table 3 to Subpart G of... Process Vents, Storage Vessels, Transfer Operations, and Wastewater Pt. 63, Subpt. G, Table 3 Table 3 to.... Recapture devices The appropriate monitoring device identified in table 4 when, in the table, the term...

  13. 40 CFR Table 3 to Subpart G of... - Process Vents-Monitoring, Recordkeeping, and Reporting Requirements for Complying With 98 Weight...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Hazardous Air Pollutants Emissions or a Limit of 20 Parts Per Million by Volume 3 Table 3 to Subpart G of... Process Vents, Storage Vessels, Transfer Operations, and Wastewater Pt. 63, Subpt. G, Table 3 Table 3 to.... Recapture devices The appropriate monitoring device identified in table 4 when, in the table, the term...

  14. Reactor pressure vessel head vents and methods of using the same

    DOEpatents

    Gels, John L; Keck, David J; Deaver, Gerald A

    2014-10-28

    Internal head vents are usable in nuclear reactors and include piping inside of the reactor pressure vessel with a vent in the reactor upper head. Piping extends downward from the upper head and passes outside of the reactor to permit the gas to escape or be forcibly vented outside of the reactor without external piping on the upper head. The piping may include upper and lowers section that removably mate where the upper head joins to the reactor pressure vessel. The removable mating may include a compressible bellows and corresponding funnel. The piping is fabricated of nuclear-reactor-safe materials, including carbon steel, stainless steel, and/or a Ni--Cr--Fe alloy. Methods install an internal head vent in a nuclear reactor by securing piping to an internal surface of an upper head of the nuclear reactor and/or securing piping to an internal surface of a reactor pressure vessel.

  15. 40 CFR Table 4 to Subpart Uuuu of... - Requirements for Performance Tests

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of the initial compliance demonstration; or (2) carbon disulfide and/or hydrogen sulfide CEMS, as... toluene storage vessel a. each existing or new cellophane operation i. measure toluene emissions (1) EPA... continuous storage vessel vents and combinations of batch and continuous storage vessel vents at normal...

  16. 40 CFR 63.132 - Process wastewater provisions-general.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 10 2014-07-01 2014-07-01 false Process wastewater provisions-general... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.132 Process wastewater provisions—general. (a) Existing sources. This paragraph specifies the requirements applicable to...

  17. 40 CFR 63.147 - Process wastewater provisions-recordkeeping.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 10 2012-07-01 2012-07-01 false Process wastewater provisions... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.147 Process wastewater provisions—recordkeeping. (a) The owner or operator transferring a Group 1 wastewater stream or...

  18. 40 CFR 63.132 - Process wastewater provisions-general.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Process wastewater provisions-general... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.132 Process wastewater provisions—general. (a) Existing sources. This paragraph specifies the requirements applicable to...

  19. 40 CFR 63.132 - Process wastewater provisions-general.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Process wastewater provisions-general... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.132 Process wastewater provisions—general. (a) Existing sources. This paragraph specifies the requirements applicable to...

  20. 40 CFR 63.132 - Process wastewater provisions-general.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 10 2012-07-01 2012-07-01 false Process wastewater provisions-general... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.132 Process wastewater provisions—general. (a) Existing sources. This paragraph specifies the requirements applicable to...

  1. 40 CFR 63.147 - Process wastewater provisions-recordkeeping.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 10 2014-07-01 2014-07-01 false Process wastewater provisions... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.147 Process wastewater provisions—recordkeeping. (a) The owner or operator transferring a Group 1 wastewater stream or...

  2. 40 CFR 63.134 - Process wastewater provisions-surface impoundments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Process wastewater provisions-surface... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.134 Process wastewater provisions—surface impoundments. (a) For each surface impoundment that receives, manages, or...

  3. 40 CFR 63.147 - Process wastewater provisions-recordkeeping.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Process wastewater provisions... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.147 Process wastewater provisions—recordkeeping. (a) The owner or operator transferring a Group 1 wastewater stream or...

  4. 40 CFR 63.147 - Process wastewater provisions-recordkeeping.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Process wastewater provisions... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.147 Process wastewater provisions—recordkeeping. (a) The owner or operator transferring a Group 1 wastewater stream or...

  5. 40 CFR 63.132 - Process wastewater provisions-general.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Process wastewater provisions-general... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.132 Process wastewater provisions—general. (a) Existing sources. This paragraph specifies the requirements applicable to...

  6. 40 CFR 63.133 - Process wastewater provisions-wastewater tanks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 10 2014-07-01 2014-07-01 false Process wastewater provisions-wastewater tanks. 63.133 Section 63.133 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater...

  7. 40 CFR 63.133 - Process wastewater provisions-wastewater tanks.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 10 2012-07-01 2012-07-01 false Process wastewater provisions-wastewater tanks. 63.133 Section 63.133 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater...

  8. 40 CFR 63.133 - Process wastewater provisions-wastewater tanks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Process wastewater provisions-wastewater tanks. 63.133 Section 63.133 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater...

  9. 40 CFR 63.133 - Process wastewater provisions-wastewater tanks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Process wastewater provisions-wastewater tanks. 63.133 Section 63.133 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater...

  10. Improved process conditions for increasing expression of MHC class II protein from a stable Drosophila S2 cell line.

    PubMed

    Shen, Xiao; Dojcinovic, Danijel; Baldi, Lucia; Hacker, David L; Luescher, Immanuel F; Wurm, Florian M

    2018-01-01

    To investigate the effects of operational process conditions on expression of MHC class II protein from a stable Drosophila S2 cell line. When the Drosophila S2 cells were grown in vented orbitally shaken TubeSpin bioreactor 600 containers, cell growth was improved three-fold and the yield of recombinant major histocompatibility (MHC) class II protein (HLA-DR1 2xHis ) increased four-fold over the levels observed for the same cells cultivated in roller bottles (RB) without vented caps. Culturing in RB with vented caps while increasing the rotation speed from 6 rpm to 18 rpm also improved cell growth five-fold and protein productivity three-fold which is comparable to the levels observed in the orbitally shaken containers. Protein activity was found to be almost identical between the two vessel systems tested. Optimized cell culture conditions and a more efficient vessel type can enhance gas transfer and mixing and lead to substantial improvement of recombinant product yields from S2 cells.

  11. 40 CFR 63.140 - Process wastewater provisions-delay of repair.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 10 2014-07-01 2014-07-01 false Process wastewater provisions-delay of... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.140 Process wastewater provisions—delay of repair. (a) Delay of repair of equipment for which a control equipment failure...

  12. 40 CFR 63.140 - Process wastewater provisions-delay of repair.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 10 2012-07-01 2012-07-01 false Process wastewater provisions-delay of... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.140 Process wastewater provisions—delay of repair. (a) Delay of repair of equipment for which a control equipment failure...

  13. 40 CFR 63.140 - Process wastewater provisions-delay of repair.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Process wastewater provisions-delay of... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.140 Process wastewater provisions—delay of repair. (a) Delay of repair of equipment for which a control equipment failure...

  14. 40 CFR 63.140 - Process wastewater provisions-delay of repair.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Process wastewater provisions-delay of... Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.140 Process wastewater provisions—delay of repair. (a) Delay of repair of equipment for which a control equipment failure...

  15. 40 CFR 63.982 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 10 2011-07-01 2011-07-01 false Requirements. 63.982 Section 63.982... Process § 63.982 Requirements. (a) General compliance requirements for storage vessels, process vents... routing to a fuel gas system or process shall comply with the applicable requirements of paragraphs (a)(1...

  16. 40 CFR 63.982 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Requirements. 63.982 Section 63.982... Process § 63.982 Requirements. (a) General compliance requirements for storage vessels, process vents... routing to a fuel gas system or process shall comply with the applicable requirements of paragraphs (a)(1...

  17. 40 CFR Table 2 to Subpart G of... - Process Vents-Coefficients for Total Resource Effectiveness for New Source Nonhalogenated and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Nonhalogenated Flare 0.5276 0.0998 −2.096×10−3 −2.000×10−4 Thermal Incinerator 0 Percent Heat Recovery 0.4068 0.0171 8.664×10−3 −3.162×10−4 Thermal Incinerator 70 Percent Heat Recovery 0.6868 3.209×10−3 3.546×10−3 1... Process Vents, Storage Vessels, Transfer Operations, and Wastewater Pt. 63, Subpt. G, Table 2 Table 2 to...

  18. 40 CFR Table 1 to Subpart G of... - Process Vents-Coefficients for Total Resource Effectiveness for Existing Source Nonhalogenated...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Coefficients a b c d Nonhalogenated Flare 1.935 3.660×10−1 −7.687×10−3 −7.333×10−4 Thermal Incinerator 0 Percent Heat Recovery 1.492 6.267×10−2 3.177×10−2 −1.159×10−3 Thermal Incinerator 70 Percent Heat Recovery... for Process Vents, Storage Vessels, Transfer Operations, and Wastewater Pt. 63, Subpt. G, Table 1...

  19. Liquid Nitrogen Subcooler Pressure Vessel Engineering Note

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rucinski, R.; /Fermilab

    1997-04-24

    The normal operating pressure of this dewar is expected to be less than 15 psig. This vessel is open to atmospheric pressure thru a non-isolatable vent line. The backpressure in the vent line was calculated to be less than 1.5 psig at maximum anticipated flow rates.

  20. 40 CFR Table 29 to Subpart G of... - Seal Related Factors for External Floating Roof Vessels

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...: Primary seal only 1.2 1.5 1.3 1.5 With shoe-mounted secondary seal 0.8 1.2 1.4 1.2 With rim-mounted... shield 0.8 0.9 NA NA With rim-mounted secondary seal 0.7 0.4 NA NA Vapor mounted resilient seal: Primary... Synthetic Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations...

  1. 40 CFR Table 29 to Subpart G of... - Seal Related Factors for External Floating Roof Vessels

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: Primary seal only 1.2 1.5 1.3 1.5 With shoe-mounted secondary seal 0.8 1.2 1.4 1.2 With rim-mounted... shield 0.8 0.9 NA NA With rim-mounted secondary seal 0.7 0.4 NA NA Vapor mounted resilient seal: Primary... Synthetic Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations...

  2. 40 CFR Table 29 to Subpart G of... - Seal Related Factors for External Floating Roof Vessels

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...: Primary seal only 1.2 1.5 1.3 1.5 With shoe-mounted secondary seal 0.8 1.2 1.4 1.2 With rim-mounted... shield 0.8 0.9 NA NA With rim-mounted secondary seal 0.7 0.4 NA NA Vapor mounted resilient seal: Primary... Synthetic Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations...

  3. Modeling of zero gravity venting: Studies of two-phase heat transfer under reduced gravity

    NASA Technical Reports Server (NTRS)

    Merte, H., Jr.

    1986-01-01

    The objective is to predict the pressure response of a saturated liquid-vapor system when undergoing a venting or depressurization process in zero gravity at low vent rates. An experimental investigation of the venting of cylindrical containers partially filled with initially saturated liquids was previously conducted under zero-gravity conditions and compared with an analytical model which incorporated the effect of interfacial mass transfer on the ullage pressure response during venting. A new model is presented to improve the estimation of the interfacial mass transfer. Duhammel's superposition integral is incorporated to approximate the transient temperature response of the interface, treating the liquid as a semi-infinite solid with conduction heat transfer. Account is also taken of the condensation taking place within the bulk of a saturated vapor as isentropic expansion takes place. Computational results are presented for the venting of R-11 from a given vessel and initial state for five different venting rates over a period of three seconds, and compared to prior NASA experiments. An improvement in the prediction of the final pressure takes place, but is still considerably below the measurements.

  4. 10 CFR 50.46a - Acceptance criteria for reactor coolant system venting systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Acceptance criteria for reactor coolant system venting... criteria for reactor coolant system venting systems. Each nuclear power reactor must be provided with high point vents for the reactor coolant system, for the reactor vessel head, and for other systems required...

  5. 10 CFR 50.46a - Acceptance criteria for reactor coolant system venting systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Acceptance criteria for reactor coolant system venting... criteria for reactor coolant system venting systems. Each nuclear power reactor must be provided with high point vents for the reactor coolant system, for the reactor vessel head, and for other systems required...

  6. 40 CFR 63.982 - Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., transfer racks, and equipment leaks. An owner or operator who is referred to this subpart for controlling regulated material emissions from storage vessels, process vents, low and high throughput transfer racks, or... racks. (i) For low throughput transfer racks, the owner or operator shall comply with the applicable...

  7. 46 CFR 56.50-85 - Tank-vent piping.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... this requirement. (4) Tank vents must extend above the weather deck, except vents from fresh water tanks, bilge oily-water holding tanks, bilge slop tanks, and tanks containing Grade E combustible... barges in inland service and for Great Lakes vessels, the height from the deck to any point where water...

  8. 46 CFR 56.50-85 - Tank-vent piping.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... this requirement. (4) Tank vents must extend above the weather deck, except vents from fresh water tanks, bilge oily-water holding tanks, bilge slop tanks, and tanks containing Grade E combustible... barges in inland service and for Great Lakes vessels, the height from the deck to any point where water...

  9. 46 CFR 56.50-85 - Tank-vent piping.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... this requirement. (4) Tank vents must extend above the weather deck, except vents from fresh water tanks, bilge oily-water holding tanks, bilge slop tanks, and tanks containing Grade E combustible... barges in inland service and for Great Lakes vessels, the height from the deck to any point where water...

  10. 40 CFR 60.112a - Standard for volatile organic compounds (VOC).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... space vents is to provide a projection below the liquid surface. Each opening in the roof except for... for automatic bleeder vents and the rim space vents is to provide a projection below the liquid... for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification...

  11. 40 CFR 60.112a - Standard for volatile organic compounds (VOC).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... space vents is to provide a projection below the liquid surface. Each opening in the roof except for... for automatic bleeder vents and the rim space vents is to provide a projection below the liquid... for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification...

  12. 40 CFR 60.112a - Standard for volatile organic compounds (VOC).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... space vents is to provide a projection below the liquid surface. Each opening in the roof except for... for automatic bleeder vents and the rim space vents is to provide a projection below the liquid... for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification...

  13. 40 CFR 60.112a - Standard for volatile organic compounds (VOC).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... space vents is to provide a projection below the liquid surface. Each opening in the roof except for... for automatic bleeder vents and the rim space vents is to provide a projection below the liquid... for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification...

  14. 40 CFR 60.112a - Standard for volatile organic compounds (VOC).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... space vents is to provide a projection below the liquid surface. Each opening in the roof except for... for automatic bleeder vents and the rim space vents is to provide a projection below the liquid... for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification...

  15. 40 CFR 63.503 - Emissions averaging provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... used in conjunction with other controls for a Group 1 storage vessel, batch front-end process vent... will be allowed only for the increase in control after November 15, 1990. (2) Group 1 emission points... Group 1 emission points that are controlled to a level less stringent than the reference control...

  16. 40 CFR 63.503 - Emissions averaging provisions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... used in conjunction with other controls for a Group 1 storage vessel, batch front-end process vent... will be allowed only for the increase in control after November 15, 1990. (2) Group 1 emission points... Group 1 emission points that are controlled to a level less stringent than the reference control...

  17. 40 CFR 63.503 - Emissions averaging provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... used in conjunction with other controls for a Group 1 storage vessel, batch front-end process vent... will be allowed only for the increase in control after November 15, 1990. (2) Group 1 emission points... Group 1 emission points that are controlled to a level less stringent than the reference control...

  18. 40 CFR 63.503 - Emissions averaging provisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... used in conjunction with other controls for a Group 1 storage vessel, batch front-end process vent... will be allowed only for the increase in control after November 15, 1990. (2) Group 1 emission points... Group 1 emission points that are controlled to a level less stringent than the reference control...

  19. 40 CFR 63.503 - Emissions averaging provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... used in conjunction with other controls for a Group 1 storage vessel, batch front-end process vent... will be allowed only for the increase in control after November 15, 1990. (2) Group 1 emission points... Group 1 emission points that are controlled to a level less stringent than the reference control...

  20. Numerical simulation by the molecular collision theory of two-phase mixture explosion characteristics in closed or vented vessels

    NASA Astrophysics Data System (ADS)

    Pascaud, J. M.; Brossard, J.; Lombard, J. M.

    1999-09-01

    The aim of this work consists in presenting a simple modelling (the molecular collision theory), easily usable in an industrial environment in order to predict the evolution of thermodynamical characteristics of the combustion of two-phase mixtures in a closed or a vented vessel. Basic characteristics of the modelling have been developed for ignition and combustion of propulsive powders and adapted with appropriate parameters linked to simplified kinetics. A simple representation of the combustion phenomena based on energy transfers and the action of specific molecules is presented. The model is generalized to various mixtures such as dust suspensions, liquid fuel drops and hybrid mixtures composed of dust and a gaseous supply such as methane or propane in the general case of vented explosions. The pressure venting due to the vent breaking is calculated from thermodynamical characteristics given by the model and taking into account, the mass rate of discharge of the different products deduced from the standard orifice equations. The application conditions determine the fuel ratio of the used mixtures, the nature of the chemical kinetics and the calculation of a universal set of parameters. The model allows to study the influence of the fuel concentration and the supply of gaseous additives, the influence of the vessel volume (2400ell leq V_bleq 250 000ell) and the influence of the venting pressure or the vent area. The first results have been compared with various experimental works available for two phase mixtures and indicate quite correct predictions.

  1. 46 CFR 38.20-5 - Venting-T/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Venting-T/ALL. 38.20-5 Section 38.20-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS LIQUEFIED FLAMMABLE GASES Venting and Ventilation § 38.20-5 Venting—T/ALL. (a) Safety relief valves on cargo tanks in barges may be connected to...

  2. 46 CFR 38.20-5 - Venting-T/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Venting-T/ALL. 38.20-5 Section 38.20-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS LIQUEFIED FLAMMABLE GASES Venting and Ventilation § 38.20-5 Venting—T/ALL. (a) Safety relief valves on cargo tanks in barges may be connected to...

  3. 40 CFR 65.151 - Condensers used as control devices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the design evaluation for storage vessels and low-throughput transfer rack controls. As provided in... control device on a Group 1 process vent or a high-throughput transfer rack with a condenser used as a... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Condensers used as control devices. 65...

  4. 40 CFR 65.151 - Condensers used as control devices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the design evaluation for storage vessels and low-throughput transfer rack controls. As provided in... control device on a Group 1 process vent or a high-throughput transfer rack with a condenser used as a... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Condensers used as control devices. 65...

  5. 40 CFR 65.151 - Condensers used as control devices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the design evaluation for storage vessels and low-throughput transfer rack controls. As provided in... control device on a Group 1 process vent or a high-throughput transfer rack with a condenser used as a... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Condensers used as control devices. 65...

  6. 40 CFR 63.112 - Emission standard.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.112 Emission standard. (a) The... emissions from all Group 1 wastewater streams, as defined in § 63.111 of this subpart. This term is.... Σ EWW2 = Sum of emissions from all Group 2 wastewater streams, as defined in § 63.111 of this...

  7. 40 CFR 63.112 - Emission standard.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.112 Emission standard. (a) The... emissions from all Group 1 wastewater streams, as defined in § 63.111 of this subpart. This term is.... Σ EWW2 = Sum of emissions from all Group 2 wastewater streams, as defined in § 63.111 of this...

  8. 40 CFR 63.112 - Emission standard.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Process Vents, Storage Vessels, Transfer Operations, and Wastewater § 63.112 Emission standard. (a) The... emissions from all Group 1 wastewater streams, as defined in § 63.111 of this subpart. This term is.... Σ EWW2 = Sum of emissions from all Group 2 wastewater streams, as defined in § 63.111 of this...

  9. Status Report on Ex-Vessel Coolability and Water Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farmer, M. T.; Robb, K. R.

    Specific to BWR plants, current accident management guidance calls for flooding the drywell to a level of approximately 1.2 m (4 feet) above the drywell floor once vessel breach has been determined. While this action can help to submerge ex-vessel core debris, it can also result in flooding the wetwell and thereby rendering the wetwell vent path unavailable. An alternate strategy is being developed in the industry guidance for responding to the severe accident capable vent Order, EA-13-109. The alternate strategy being proposed would throttle the flooding rate to achieve a stable wetwell water level while preserving the wetwell ventmore » path. The overall objective of this work is to upgrade existing analytical tools (i.e. MELTSPREAD and CORQUENCH - which have been used as part of the DOE-sponsored Fukushima accident analyses) in order to provide flexible, analytically capable, and validated models to support the development of water throttling strategies for BWRs that are aimed at keeping ex-vessel core debris covered with water while preserving the wetwell vent path.« less

  10. 40 CFR Figure 1 to Subpart G of... - Definitions of Terms Used in Wastewater Equations

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Definitions of Terms Used in Wastewater... Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater Pt. 63, Subpt. G, Fig. 1 Figure 1 to Subpart G of Part 63—Definitions of Terms Used in Wastewater...

  11. Pressure suppression containment system

    DOEpatents

    Gluntz, Douglas M.; Townsend, Harold E.

    1994-03-15

    A pressure suppression containment system includes a containment vessel surrounding a reactor pressure vessel and defining a drywell therein containing a non-condensable gas. An enclosed wetwell pool is disposed inside the containment vessel, and a gravity driven cooling system (GDCS) pool is disposed above the wetwell pool in the containment vessel. The wetwell pool includes a plenum for receiving the non-condensable gas carried with steam from the drywell following a loss-of coolant-accident (LOCA). The wetwell plenum is vented to a plenum above the GDCS pool following the LOCA for suppressing pressure rise within the containment vessel. A method of operation includes channeling steam released into the drywell following the LOCA into the wetwell pool for cooling along with the non-condensable gas carried therewith. The GDCS pool is then drained by gravity, and the wetwell plenum is vented into the GDCS plenum for channeling the non-condensable gas thereto.

  12. Pressure suppression containment system

    DOEpatents

    Gluntz, D.M.; Townsend, H.E.

    1994-03-15

    A pressure suppression containment system includes a containment vessel surrounding a reactor pressure vessel and defining a drywell therein containing a non-condensable gas. An enclosed wetwell pool is disposed inside the containment vessel, and a gravity driven cooling system (GDCS) pool is disposed above the wetwell pool in the containment vessel. The wetwell pool includes a plenum for receiving the non-condensable gas carried with steam from the drywell following a loss-of-coolant-accident (LOCA). The wetwell plenum is vented to a plenum above the GDCS pool following the LOCA for suppressing pressure rise within the containment vessel. A method of operation includes channeling steam released into the drywell following the LOCA into the wetwell pool for cooling along with the non-condensable gas carried therewith. The GDCS pool is then drained by gravity, and the wetwell plenum is vented into the GDCS plenum for channeling the non-condensable gas thereto. 6 figures.

  13. Evaluation of Treatment Technologies for Wastewater from Insensitive Munitions Production. Phase 1: Technology Down-Selection

    DTIC Science & Technology

    2013-11-01

    the AOP reactor according to the target process formulation. Gases were vented to a GAC vessel. ERDC/EL TR-13-20 94 10.2.2 Results and Discussion...destructive and filtration methods such as biological treatment (destructive), chemical reduction (destructive), reverse osmosis (RO)/nano- filtration ... filtration ), and advanced oxidation processes (destructive). A comprehensive evaluation of alternatives relies on a detailed list of criteria, allowing for

  14. 40 CFR 63.563 - Compliance and performance testing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards for Marine Tank Vessel Loading Operations § 63.563 Compliance and performance testing. (a) The... indirectly, shall be secured closed during marine tank vessel loading operations either by using a car-seal... devices, sampling, and venting for maintenance. Marine tank vessel loading operations shall not be...

  15. 40 CFR 63.563 - Compliance and performance testing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards for Marine Tank Vessel Loading Operations § 63.563 Compliance and performance testing. (a) The... indirectly, shall be secured closed during marine tank vessel loading operations either by using a car-seal... devices, sampling, and venting for maintenance. Marine tank vessel loading operations shall not be...

  16. Filling of orbital fluid management systems

    NASA Technical Reports Server (NTRS)

    Merino, F.; Blatt, M. H.; Thies, N. C.

    1978-01-01

    A study was performed with three objectives: (1) analyze fluid management system fill under orbital conditions; (2) determine what experimentation is needed; and (3) develop an experimental program. The fluid management system was a 1.06m (41.7 in) diameter pressure vessel with screen channel device. Analyses were conducted using liquid hydrogen and N2O4. The influence of helium and autogenous pressurization systems was considered. Analyses showed that fluid management system fill will be more difficult with a cryogen than with an earth storable. The key to a successful fill with cryogens is in devising techniques for filling without vent liquid, and removing trapped vapor from the screen device at tank fill completion. This will be accomplished with prechill, fill, and vapor condensation processes. Refill will require a vent and purge process, to dilute the residual helium, prior to introducing liquid. Neither prechill, chill, nor purge processes will be required for earth storables.

  17. 46 CFR 98.25-70 - Venting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Venting. 98.25-70 Section 98.25-70 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS SPECIAL CONSTRUCTION, ARRANGEMENT, AND OTHER PROVISIONS FOR CERTAIN DANGEROUS CARGOES IN BULK Anhydrous Ammonia in Bulk § 98.25-70...

  18. 46 CFR 98.25-70 - Venting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Venting. 98.25-70 Section 98.25-70 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS SPECIAL CONSTRUCTION, ARRANGEMENT, AND OTHER PROVISIONS FOR CERTAIN DANGEROUS CARGOES IN BULK Anhydrous Ammonia in Bulk § 98.25-70...

  19. 46 CFR 98.25-70 - Venting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Venting. 98.25-70 Section 98.25-70 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS SPECIAL CONSTRUCTION, ARRANGEMENT, AND OTHER PROVISIONS FOR CERTAIN DANGEROUS CARGOES IN BULK Anhydrous Ammonia in Bulk § 98.25-70...

  20. 46 CFR 98.25-70 - Venting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Venting. 98.25-70 Section 98.25-70 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS SPECIAL CONSTRUCTION, ARRANGEMENT, AND OTHER PROVISIONS FOR CERTAIN DANGEROUS CARGOES IN BULK Anhydrous Ammonia in Bulk § 98.25-70...

  1. 46 CFR 98.25-70 - Venting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Venting. 98.25-70 Section 98.25-70 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS SPECIAL CONSTRUCTION, ARRANGEMENT, AND OTHER PROVISIONS FOR CERTAIN DANGEROUS CARGOES IN BULK Anhydrous Ammonia in Bulk § 98.25-70...

  2. 46 CFR 154.1735 - Methyl acetylene-propadiene mixture.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... mixture must have a refrigeration system without vapor compression or have a refrigeration system with the... separate cargo piping, vent piping, and refrigeration equipment for methyl acetylene-propadiene that are segregated from other cargo piping, vent piping and refrigeration equipment on the vessel. [CGD 74-289, 44 FR...

  3. 46 CFR 154.1735 - Methyl acetylene-propadiene mixture.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... mixture must have a refrigeration system without vapor compression or have a refrigeration system with the... separate cargo piping, vent piping, and refrigeration equipment for methyl acetylene-propadiene that are segregated from other cargo piping, vent piping and refrigeration equipment on the vessel. [CGD 74-289, 44 FR...

  4. 46 CFR 154.1735 - Methyl acetylene-propadiene mixture.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... mixture must have a refrigeration system without vapor compression or have a refrigeration system with the... separate cargo piping, vent piping, and refrigeration equipment for methyl acetylene-propadiene that are segregated from other cargo piping, vent piping and refrigeration equipment on the vessel. [CGD 74-289, 44 FR...

  5. 46 CFR 154.1735 - Methyl acetylene-propadiene mixture.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... mixture must have a refrigeration system without vapor compression or have a refrigeration system with the... separate cargo piping, vent piping, and refrigeration equipment for methyl acetylene-propadiene that are segregated from other cargo piping, vent piping and refrigeration equipment on the vessel. [CGD 74-289, 44 FR...

  6. 46 CFR 154.1735 - Methyl acetylene-propadiene mixture.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... mixture must have a refrigeration system without vapor compression or have a refrigeration system with the... separate cargo piping, vent piping, and refrigeration equipment for methyl acetylene-propadiene that are segregated from other cargo piping, vent piping and refrigeration equipment on the vessel. [CGD 74-289, 44 FR...

  7. CALANDRIA TYPE SODIUM GRAPHITE REACTOR

    DOEpatents

    Peterson, R.M.; Mahlmeister, J.E.; Vaughn, N.E.; Sanders, W.J.; Williams, A.C.

    1964-02-11

    A sodium graphite power reactor in which the unclad graphite moderator and fuel elements are contained within a core tank is described. The core tank is submersed in sodium within the reactor vessel. Extending longitudinally through the core thnk are process tubes with fuel elements positioned therein. A bellows sealing means allows axial expansion and construction of the tubes. Within the core tank, a leakage plenum is located below the graphite, and above the graphite is a gas space. A vent line regulates the gas pressure in the space, and another line removes sodium from the plenum. The sodium coolant flows from the lower reactor vessel through the annular space between the fuel elements and process tubes and out into the reactor vessel space above the core tank. From there, the heated coolant is drawn off through an outlet line and sent to the heat exchange. (AEC)

  8. The Measurement of the Rates of Burning at Zero Gas Velocity of some German Propellants and of a British S.U. Propellant

    DTIC Science & Technology

    1945-03-01

    of gaa ever the aurfaa« la of obvious inportöno« in the assign of ro’Jkotn. SSv* t appear to have taken considerable treublo ever the o^igä of...in the vented vessel to give tho desired pressure end tbtf and of tho vessel la opened before tha »maples aro ooiaplutely burned through, Tho...ahaokloton (aoo ref. 2.) used a nothod la whioh too propollant coder investigation won allowed to bora oospletely in K vented UmiUS. and the vat

  9. Evacuated optical structure comprising optical bench mounted to sidewall of vacuum chamber in a manner which inhibits deflection and rotation of the optical bench

    DOEpatents

    Bowers, Joel M.

    1994-01-01

    An improved evacuated optical structure is disclosed comprising an optical bench mounted in a vacuum vessel in a manner which inhibits transmission of movement of the vacuum vessel to the optical bench, yet provides a compact and economical structure. The vacuum vessel is mounted, through a sidewall thereof, to a support wall at four symmetrically positioned and spaced apart areas, each of which comprises a symmetrically positioned group of mounting structures passing through the sidewall of the vacuum vessel. The optical bench is pivotally secured to the vacuum vessel by four symmetrically spaced apart bolts and spherical bearings, each of which is centrally positioned within one of the four symmetrically positioned groups of vacuum vessel mounting structures. Cover plates and o-ring seals are further provided to seal the vacuum vessel mounting structures from the interior of the vacuum vessel, and venting bores are provided to vent trapped gases in the bores used to secure the cover plates and o-rings to the vacuum vessel. Provision for detecting leaks in the mounting structures from the rear surface of the vacuum vessel sidewall facing the support wall are also provided. Deflection to the optical bench within the vacuum vessel is further minimized by tuning the structure for a resonant frequency of at least 100 Hertz.

  10. Evacuated optical structure comprising optical bench mounted to sidewall of vacuum chamber in a manner which inhibits deflection and rotation of the optical bench

    DOEpatents

    Bowers, J.M.

    1994-04-19

    An improved evacuated optical structure is disclosed comprising an optical bench mounted in a vacuum vessel in a manner which inhibits transmission of movement of the vacuum vessel to the optical bench, yet provides a compact and economical structure. The vacuum vessel is mounted, through a sidewall thereof, to a support wall at four symmetrically positioned and spaced apart areas, each of which comprises a symmetrically positioned group of mounting structures passing through the sidewall of the vacuum vessel. The optical bench is pivotally secured to the vacuum vessel by four symmetrically spaced apart bolts and spherical bearings, each of which is centrally positioned within one of the four symmetrically positioned groups of vacuum vessel mounting structures. Cover plates and o-ring seals are further provided to seal the vacuum vessel mounting structures from the interior of the vacuum vessel, and venting bores are provided to vent trapped gases in the bores used to secure the cover plates and o-rings to the vacuum vessel. Provision for detecting leaks in the mounting structures from the rear surface of the vacuum vessel sidewall facing the support wall are also provided. Deflection to the optical bench within the vacuum vessel is further minimized by tuning the structure for a resonant frequency of at least 100 Hertz. 10 figures.

  11. Empirical Profiling of Cold Hydrogen Plumes Formed from Venting Of LH2 Storage Vessels: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buttner, William J; Rivkin, Carl H; Schmidt, Kara

    Liquid hydrogen (LH2) storage is a viable approach to assuring sufficient hydrogen capacity at commercial fuelling stations. Presently, LH2 is produced at remote facilities and then transported to the end-use site by road vehicles (i.e., LH2 tanker trucks). Venting of hydrogen to depressurize the transport storage tank is a routine part of the LH2 delivery process. The behaviour of cold hydrogen plumes has not been well-characterized because empirical field data is essentially non-existent. The NFPA 2 Hydrogen Storage Safety Task Group, which consists of hydrogen producers, safety experts, and CFD modellers, has identified the lack of understanding of hydrogen dispersionmore » during LH2 venting of storage vessel as a critical gap for establishing safety distances at LH2 facilities, especially commercial hydrogen fuelling stations. To address this need, the NREL sensor laboratory, in collaboration with the NFPA 2 Safety Task Group developed the Cold Hydrogen Plume Analyzer to empirically characterize the hydrogen plume formed during LH2 storage tank venting. A prototype Analyzer was developed and field-deployed at an actual LH2 venting operation with critical findings that included: - H2 being detected as much as 2 m lower than the release point, which is not predicted by existing models - A small and inconsistent correlation between oxygen depletion and the hydrogen concentration - A negligible to non-existent correlation between in-situ temperature and the hydrogen concentration The Analyzer is currently being upgraded for enhanced metrological capabilities including improved real-time spatial and temporal profiling of the plume and tracking of prevailing weather conditions. Additional deployments are planned to monitor plume behaviour under different wind, humidity, and temperatures. This data will be shared with the NFPA 2 Safety Task Group and ultimately will be used support theoretical models and code requirements prescribed in NFPA 2.« less

  12. 46 CFR 32.55-5 - Ventilation of tank vessels constructed between November 10, 1936, and July 1, 1951-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... actuated gas ejectors or blowers or ventilators fitted with heads for natural ventilation, will be approved... 46 Shipping 1 2010-10-01 2010-10-01 false Ventilation of tank vessels constructed between November... HOMELAND SECURITY TANK VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS Ventilation and Venting...

  13. Experimental characterization of fire-induced response of rigid polyurethane foam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chu, T.Y.; Gill, W.; Moore, J.W.

    1995-12-31

    Reported is the result of an experimental investigation of fire-induced response of a 96 kg/m{sup 3} closed cell rigid polyurethane foam. The specimen is 0.37 m in diameter, and 152 mm thick, placed in a cylindrical test vessel. The fire condition is simulated by heating the bottom of the test vessel to 1283 K using a radiant heat source. Real-time x-ray shows that the degradation process involves the progression of a charring front into the virgin material. The charred region has a regular and graded structure consisting of a packed bubble outer layer and successive layers of thin shells. Themore » layer-to-layer permeability appears to be poor. There are indications that gas vents laterally. The shell-like structure might be the result of lateral venting. Although the foam degradation process is quite complicated, the in-depth temperature responses in the uncharted foam appear to be consistent with steady state ablation. The measured temperature responses are well represented by the exponential distribution for steady state ablation. An estimate of the thermal diffusivity of the foam is obtained from the ablation model. The experiment is part of a more comprehensive program to develop material response models of foams and encapsulants.« less

  14. 46 CFR 162.017-2 - Type.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... APPROVAL ENGINEERING EQUIPMENT General Provisions; Valves, Pressure-Vacuum Relief, for Tank Vessels § 162.017-2 Type. This specification covers the design and construction of pressure-vacuum relief valves intended for use in venting systems on all tank vessels transporting inflammable or combustible liquids...

  15. 46 CFR 162.017-2 - Type.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... APPROVAL ENGINEERING EQUIPMENT General Provisions; Valves, Pressure-Vacuum Relief, for Tank Vessels § 162.017-2 Type. This specification covers the design and construction of pressure-vacuum relief valves intended for use in venting systems on all tank vessels transporting inflammable or combustible liquids...

  16. 46 CFR 162.017-2 - Type.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... APPROVAL ENGINEERING EQUIPMENT General Provisions; Valves, Pressure-Vacuum Relief, for Tank Vessels § 162.017-2 Type. This specification covers the design and construction of pressure-vacuum relief valves intended for use in venting systems on all tank vessels transporting inflammable or combustible liquids...

  17. 46 CFR 36.20-1 - Flame screens-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Flame screens-TB/ALL. 36.20-1 Section 36.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS ELEVATED TEMPERATURE CARGOES Vents and Ventilation § 36.20-1 Flame screens—TB/ALL. (a) Flame screens may be omitted in the vent lines on cargo tanks...

  18. 46 CFR 36.20-1 - Flame screens-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Flame screens-TB/ALL. 36.20-1 Section 36.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS ELEVATED TEMPERATURE CARGOES Vents and Ventilation § 36.20-1 Flame screens—TB/ALL. (a) Flame screens may be omitted in the vent lines on cargo tanks...

  19. 46 CFR 36.20-1 - Flame screens-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Flame screens-TB/ALL. 36.20-1 Section 36.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS ELEVATED TEMPERATURE CARGOES Vents and Ventilation § 36.20-1 Flame screens—TB/ALL. (a) Flame screens may be omitted in the vent lines on cargo tanks...

  20. 46 CFR 36.20-1 - Flame screens-TB/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Flame screens-TB/ALL. 36.20-1 Section 36.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS ELEVATED TEMPERATURE CARGOES Vents and Ventilation § 36.20-1 Flame screens—TB/ALL. (a) Flame screens may be omitted in the vent lines on cargo tanks...

  1. 46 CFR 36.20-1 - Flame screens-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Flame screens-TB/ALL. 36.20-1 Section 36.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS ELEVATED TEMPERATURE CARGOES Vents and Ventilation § 36.20-1 Flame screens—TB/ALL. (a) Flame screens may be omitted in the vent lines on cargo tanks...

  2. Biomass Economy

    DTIC Science & Technology

    1985-11-01

    Boiler and Pressure Vessel Code HEI Heat Exchanger Institute Heat and Material Balance c. System Description (1) Condenser... Boiler and Pressure Vessel Code "AN(SI B31.1 Power Piping d. System Description (1) Deaerator The deaerator will be d direct contact feedwater heater, and...vent, and drain piping. "b . Applicable Codes ASME Boiler and Pressure Vessel Code "ANSI B31.1 - Power Piping Code

  3. 46 CFR 162.017-2 - Type.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... APPROVAL ENGINEERING EQUIPMENT Valves, Pressure-Vacuum Relief, for Tank Vessels § 162.017-2 Type. This specification covers the design and construction of pressure-vacuum relief valves intended for use in venting systems on all tank vessels transporting inflammable or combustible liquids. [56 FR 35827, July 29, 1991] ...

  4. 46 CFR 162.017-2 - Type.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... APPROVAL ENGINEERING EQUIPMENT Valves, Pressure-Vacuum Relief, for Tank Vessels § 162.017-2 Type. This specification covers the design and construction of pressure-vacuum relief valves intended for use in venting systems on all tank vessels transporting inflammable or combustible liquids. [56 FR 35827, July 29, 1991] ...

  5. 40 CFR 60.5416 - What are the initial and continuous cover and closed vent system inspection and monitoring...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What are the initial and continuous cover and closed vent system inspection and monitoring requirements for my storage vessel and centrifugal compressor affected facility? 60.5416 Section 60.5416 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUE...

  6. 40 CFR 60.5411 - What additional requirements must I meet to determine initial compliance for my closed vent...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What additional requirements must I meet to determine initial compliance for my closed vent systems routing materials from storage vessels and centrifugal compressor wet seal degassing systems? 60.5411 Section 60.5411 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)...

  7. 40 CFR 60.5416 - What are the initial and continuous cover and closed vent system inspection and monitoring...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What are the initial and continuous cover and closed vent system inspection and monitoring requirements for my storage vessel and centrifugal compressor affected facility? 60.5416 Section 60.5416 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUE...

  8. 40 CFR 63.522 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... discrete venting episode that may be associated with a single unit operation. For example, a displacement of vapor resulting from the charging of a vessel with HAP will result in a discrete emission episode... of the charge. If the vessel is then heated, there will also be another discrete emission episode...

  9. 40 CFR 63.522 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... discrete venting episode that may be associated with a single unit operation. For example, a displacement of vapor resulting from the charging of a vessel with HAP will result in a discrete emission episode... of the charge. If the vessel is then heated, there will also be another discrete emission episode...

  10. 40 CFR 63.522 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... discrete venting episode that may be associated with a single unit operation. For example, a displacement of vapor resulting from the charging of a vessel with HAP will result in a discrete emission episode... of the charge. If the vessel is then heated, there will also be another discrete emission episode...

  11. 40 CFR 63.522 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... discrete venting episode that may be associated with a single unit operation. For example, a displacement of vapor resulting from the charging of a vessel with HAP will result in a discrete emission episode... of the charge. If the vessel is then heated, there will also be another discrete emission episode...

  12. System for venting gas from a liquid storage tank

    NASA Astrophysics Data System (ADS)

    Dugan, Regina E.

    1989-07-01

    Gas is vented from a non-cryogenic liquid storage tank while discharging pressurized liquid from a tube into the tank through a plurality of inclined jets, circumferentially spaced about an end of a vent tube positioned within the tube. Each jet is directed toward a central axis of the vent tube, such that the end of the vent tube receives gas from the vessel passing between individual jetstreams, which in combination form a conical shaped barrier to liquid droplets which would otherwise also pass to the vent tube and out the tank. Gas is thus vented through the central tube while pressurized liquid flows in an axially opposite direction in the annulus between the inner vent tube and the outer liquid tube. The system of the present invention is prarticularly well suited for venting gas from a tank being replenished with liquid at a zero or near zero gravity environment. A screen-type liquid acquisition device employing surface tension is provided for withdrawing substantially liquid from the tank. The withdrawn liquid may be resupplied to the liquid tube under pressure supplied by a circulating pump, thereby releasing substantially only gas from the storage tank to reduce the pressure in the tank.

  13. Venting and High Vacuum Performance of Low Density Multilayer Insulation

    NASA Astrophysics Data System (ADS)

    Riesco, M. E.; McLean, C. H.; Mills, G. L.; Buerger, S.; Meyer, M. L.

    2010-04-01

    The NASA Exploration Program is currently studying the use liquid oxygen, liquid methane and liquid hydrogen for propulsion in future spacecraft for Exploration of the Moon and Mars. This will require the efficient long term, on-orbit storage of these cryogenic propellants. Multilayer Insulation (MLI) will be critical to achieving the required thermal performance since it has much lower heat transfer than any other insulation when used in a vacuum. MLI with a low density (⩽10 layers/cm) has been shown in previous work to be the most mass efficient. The size and mass constraints of these propulsion systems will not allow a structural shell to be used to provide vacuum for the MLI during ground hold and launch. The baseline approach is to purge the MLI during ground hold with an inert gas which is then vented during launch ascent and on-orbit. This paper presents the results on experimental tests and modeling performed by Ball Aerospace on low density, non-perforated MLI used to insulate a cryogenic tank simulating an Exploration cryogenic propellant storage vessel. These include measurements of the rate of venting and of the heat transfer of gas filled insulation, fully evacuated insulation and during the transition in between. Results of transient computer modeling of the MLI venting and heat transfer process are also presented. Previous work by some of the authors performed vent testing using MLI with perforations and slits and a slow pump down rate.

  14. 40 CFR 65.62 - Process vent group determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., or Group 2B) for each process vent. Group 1 process vents require control, and Group 2A and 2B... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Process vent group determination. 65... (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Process Vents § 65.62 Process vent group determination. (a) Group...

  15. 46 CFR 32.55-1 - Ventilation of tank vessels constructed on or after July 1, 1951-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS Ventilation and Venting § 32.55-1 Ventilation... means of ventilation. (b) Compartments containing machinery where sources of vapor ignition are normally... approved for this purpose. Machinery spaces below the freeboard deck, in which fuels with flash point of...

  16. 46 CFR 32.55-1 - Ventilation of tank vessels constructed on or after July 1, 1951-TB/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS Ventilation and Venting § 32.55-1 Ventilation... means of ventilation. (b) Compartments containing machinery where sources of vapor ignition are normally... approved for this purpose. Machinery spaces below the freeboard deck, in which fuels with flash point of...

  17. 46 CFR 32.55-1 - Ventilation of tank vessels constructed on or after July 1, 1951-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS Ventilation and Venting § 32.55-1 Ventilation... means of ventilation. (b) Compartments containing machinery where sources of vapor ignition are normally... approved for this purpose. Machinery spaces below the freeboard deck, in which fuels with flash point of...

  18. 46 CFR 32.55-1 - Ventilation of tank vessels constructed on or after July 1, 1951-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS Ventilation and Venting § 32.55-1 Ventilation... means of ventilation. (b) Compartments containing machinery where sources of vapor ignition are normally... approved for this purpose. Machinery spaces below the freeboard deck, in which fuels with flash point of...

  19. 46 CFR 32.55-1 - Ventilation of tank vessels constructed on or after July 1, 1951-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS Ventilation and Venting § 32.55-1 Ventilation... means of ventilation. (b) Compartments containing machinery where sources of vapor ignition are normally... approved for this purpose. Machinery spaces below the freeboard deck, in which fuels with flash point of...

  20. Pipe overpack container for trasuranic waste storage and shipment

    DOEpatents

    Geinitz, Richard R.; Thorp, Donald T.; Rivera, Michael A.

    1999-01-01

    A Pipe Overpack Container for transuranic waste storage and shipment. The system consists of a vented pipe component which is positioned in a vented, insulated 55 gallon steel drum. Both the vented pipe component and the insulated drum are capable of being secured to prevent the contents from leaving the vessel. The vented pipe component is constructed of 1/4 inch stainless steel to provide radiation shielding. Thus, allowing shipment having high Americium-241 content. Several Pipe Overpack Containers are then positioned in a type B, Nuclear Regulatory Commission (NRC) approved, container. In the current embodiment, a TRUPACT-II container was employed and a maximum of fourteen Pipe Overpack Containers were placed in the TRUPACT-II. The combination received NRC approval for the shipment and storage of transuranic waste.

  1. Reactor core isolation cooling system

    DOEpatents

    Cooke, F.E.

    1992-12-08

    A reactor core isolation cooling system includes a reactor pressure vessel containing a reactor core, a drywell vessel, a containment vessel, and an isolation pool containing an isolation condenser. A turbine is operatively joined to the pressure vessel outlet steamline and powers a pump operatively joined to the pressure vessel feedwater line. In operation, steam from the pressure vessel powers the turbine which in turn powers the pump to pump makeup water from a pool to the feedwater line into the pressure vessel for maintaining water level over the reactor core. Steam discharged from the turbine is channeled to the isolation condenser and is condensed therein. The resulting heat is discharged into the isolation pool and vented to the atmosphere outside the containment vessel for removing heat therefrom. 1 figure.

  2. Reactor core isolation cooling system

    DOEpatents

    Cooke, Franklin E.

    1992-01-01

    A reactor core isolation cooling system includes a reactor pressure vessel containing a reactor core, a drywell vessel, a containment vessel, and an isolation pool containing an isolation condenser. A turbine is operatively joined to the pressure vessel outlet steamline and powers a pump operatively joined to the pressure vessel feedwater line. In operation, steam from the pressure vessel powers the turbine which in turn powers the pump to pump makeup water from a pool to the feedwater line into the pressure vessel for maintaining water level over the reactor core. Steam discharged from the turbine is channeled to the isolation condenser and is condensed therein. The resulting heat is discharged into the isolation pool and vented to the atmosphere outside the containment vessel for removing heat therefrom.

  3. Heat dissipating nuclear reactor with metal liner

    DOEpatents

    Gluekler, E.L.; Hunsbedt, A.; Lazarus, J.D.

    1985-11-21

    A nuclear reactor containment including a reactor vessel disposed within a cavity with capability for complete inherent decay heat removal in the earth and surrounded by a cast steel containment member which surrounds the vessel is described in this disclosure. The member has a thick basemat in contact with metal pilings. The basemat rests on a bed of porous particulate material, into which water is fed to produce steam which is vented to the atmosphere. There is a gap between the reactor vessel and the steel containment member. The containment member holds any sodium or core debris escaping from the reactor vessel if the core melts and breaches the vessel.

  4. Heat dissipating nuclear reactor with metal liner

    DOEpatents

    Gluekler, Emil L.; Hunsbedt, Anstein; Lazarus, Jonathan D.

    1987-01-01

    Disclosed is a nuclear reactor containment including a reactor vessel disposed within a cavity with capability for complete inherent decay heat removal in the earth and surrounded by a cast steel containment member which surrounds the vessel. The member has a thick basemat in contact with metal pilings. The basemat rests on a bed of porous particulate material, into which water is fed to produce steam which is vented to the atmosphere. There is a gap between the reactor vessel and the steel containment member. The containment member holds any sodium or core debris escaping from the reactor vessel if the core melts and breaches the vessel.

  5. Pipe overpack container for transuranic waste storage and shipment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geinitz, R.R.; Thorp, D.T.; Rivera, M.A.

    1999-12-07

    A Pipe Overpack Container is described for transuranic waste storage and shipment. The system consists of a vented pipe component which is positioned in a vented, insulated 55 gallon steel drum. Both the vented pipe component and the insulated drum are capable of being secured to prevent the contents from leaving the vessel. The vented pipe component is constructed of 1/4 inch stainless steel to provide radiation shielding, thus allowing shipment having high Americium-241 content. Several Pipe Overpack Containers are then positioned in a type B, Nuclear Regulatory Commission (NRC) approved, container. In the current embodiment, a TRUPACT-II container wasmore » employed and a maximum of fourteen Pipe Overpack Containers were placed in the TRUPACT-II. The combination received NRC approval for the shipment and storage of transuranic waste.« less

  6. Optical Detection of Organic Chemical Biosignatures at Hydrothermal Vents

    NASA Technical Reports Server (NTRS)

    Conrad, P. G.; Lane, A. L.; Bhartia, R.; Hug, W. H.

    2004-01-01

    We have developed a non-contact, optical life detection instrument that can detect organic chemical biosignatures in a number of different environments, including dry land, shallow aqueous, deep marine or in ice. Hence, the instrument is appropriate as a biosignature survey tool both for Mars exploration or in situ experiments in an ice-covered ocean such as one might wish to explore on Europa. Here, we report the results we obtained on an expedition aboard the Russian oceanographic vessel Akademik Mstislav Keldysh to hydrothermal vent sites in the Pacific Ocean using our life detection instrument MCDUVE, a multichannel, deep ultraviolet excitation fluorescence detector. MCDUVE detected organic material distribution on rocks near the vent, as well as direct detection of organisms, both microbial and microscopic. We also were able to detect organic material issuing directly from vent chimneys, measure the organic signature of the water column as we ascended, and passively observe the emission of light directly from some vents.

  7. 40 CFR 65.62 - Process vent group determination.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Process vent group determination. 65... (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Process Vents § 65.62 Process vent group determination. (a) Group status. The owner or operator of a process vent shall determine the group status (i.e., Group 1, Group 2A...

  8. 40 CFR 65.62 - Process vent group determination.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Process vent group determination. 65... (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Process Vents § 65.62 Process vent group determination. (a) Group status. The owner or operator of a process vent shall determine the group status (i.e., Group 1, Group 2A...

  9. 40 CFR 65.62 - Process vent group determination.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Process vent group determination. 65... (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Process Vents § 65.62 Process vent group determination. (a) Group status. The owner or operator of a process vent shall determine the group status (i.e., Group 1, Group 2A...

  10. Radiant vessel auxiliary cooling system

    DOEpatents

    Germer, John H.

    1987-01-01

    In a modular liquid-metal pool breeder reactor, a radiant vessel auxiliary cooling system is disclosed for removing the residual heat resulting from the shutdown of a reactor by a completely passive heat transfer system. A shell surrounds the reactor and containment vessel, separated from the containment vessel by an air passage. Natural circulation of air is provided by air vents at the lower and upper ends of the shell. Longitudinal, radial and inwardly extending fins extend from the shell into the air passage. The fins are heated by radiation from the containment vessel and convect the heat to the circulating air. Residual heat from the primary reactor vessel is transmitted from the reactor vessel through an inert gas plenum to a guard or containment vessel designed to contain any leaking coolant. The containment vessel is conventional and is surrounded by the shell.

  11. Isotopic Approaches to Allying Productivity and Sulfur Metabolism in Three Symbiotic Hydrothermal Vent Molluscs

    NASA Astrophysics Data System (ADS)

    Beinart, R.; Gartman, A.; Sanders, J. G.; Luther, G. W.; Girguis, P. R.

    2012-12-01

    Symbioses between animals and chemosynthetic bacteria predominate at hydrothermal vents. In these associations, the endosymbiotic bacteria utilize chemical reductants for the energy to support autotrophy, providing primary nutrition for the host. Despite their ubiquity at vents worldwide, little is known about the rates of productivity of these symbioses under different physico-chemical regimes or how their metabolism effects the local geochemical environment. To address this matter, we used high-pressure flow through incubations and stable isotopic tracers to maintain three genera of symbiotic mollusc - the gastropods Alviniconcha and Ifremeria, and the mussel Bathymodiolus - at vent-like conditions. Via the incorporation of isotopically labeled compounds, we assessed their productivity when using different reduced sulfur species as reductants. Using cyclic voltammetry, mass spectrometry and discrete geochemical analyses, we concurrently measured their effect on sulfur flux from the vessels. We found that the symbionts of all three genera can support autotrophy with hydrogen sulfide and thiosulfate, though at different rates. Additionally, by examining the rate of isotopic incorporation into biomass, we revealed intra-generic variability in productivity among the individuals in our experimental assemblages that are likely related to differences in the geochemical regime along the length of reactor. These geochemical gradients are due to the activity of other individuals within the vessel, since those organisms closest to the influent of the vent-like water had the highest measured carbon incorporation. Finally, we measured the uptake and excretion of sulfur species, which illustrate the degree to which these symbioses might impact local sulfur chemistry in situ. These experiments show that A) access to particular sulfur species differentially affects the productivity of vent symbioses, suggesting that competition for these substrates, both within and between host genera, could play a role in the structure of these communities, and B) that these symbioses could play a role in altering the local geochemical regime, influencing the activity and distribution of other associated microorganisms including free-living bacteria.

  12. WTP Waste Feed Qualification: Hydrogen Generation Rate Measurement Apparatus Testing Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, M. E.; Newell, J. D.; Smith, T. E.

    The generation rate of hydrogen gas in the Hanford tank waste will be measured during the qualification of the staged tank waste for processing in the Hanford Tank Waste Treatment and Immobilization Plant. Based on a review of past practices in measurement of the hydrogen generation, an apparatus to perform this measurement has been designed and tested for use during waste feed qualification. The hydrogen generation rate measurement apparatus (HGRMA) described in this document utilized a 100 milliliter sample in a continuously-purged, continuously-stirred vessel, with measurement of hydrogen concentration in the vent gas. The vessel and lid had a combinedmore » 220 milliliters of headspace. The vent gas system included a small condenser to prevent excessive evaporative losses from the sample during the test, as well as a demister and filter to prevent particle migration from the sample to the gas chromatography system. The gas chromatograph was an on line automated instrument with a large-volume sample-injection system to allow measurement of very low hydrogen concentrations. This instrument automatically sampled the vent gas from the hydrogen generation rate measurement apparatus every five minutes and performed data regression in real time. The fabrication of the hydrogen generation rate measurement apparatus was in accordance with twenty three (23) design requirements documented in the conceptual design package, as well as seven (7) required developmental activities documented in the task plan associated with this work scope. The HGRMA was initially tested for proof of concept with physical simulants, and a remote demonstration of the system was performed in the Savannah River National Laboratory Shielded Cells Mockup Facility. Final verification testing was performed using non-radioactive simulants of the Hanford tank waste. Three different simulants were tested to bound the expected rheological properties expected during waste feed qualification testing. These simulants were tested at different temperatures using purge gas spiked with varying amounts of hydrogen to provide verification that the system could accurately measure the hydrogen in the vent gas at steady state.« less

  13. Method for destroying hazardous organics and other combustible materials in a subcritical/supercritical reactor

    DOEpatents

    Janikowski, Stuart K.

    2000-01-01

    A waste destruction method using a reactor vessel to combust and destroy organic and combustible waste, including the steps of introducing a supply of waste into the reactor vessel, introducing a supply of an oxidant into the reactor vessel to mix with the waste forming a waste and oxidant mixture, introducing a supply of water into the reactor vessel to mix with the waste and oxidant mixture forming a waste, water and oxidant mixture, reciprocatingly compressing the waste, water and oxidant mixture forming a compressed mixture, igniting the compressed mixture forming a exhaust gas, and venting the exhaust gas into the surrounding atmosphere.

  14. Detecting deep sea hydrothermal vents with a split-beam echosounder

    NASA Astrophysics Data System (ADS)

    Gray, L. M.; Jerram, K.

    2016-12-01

    In May 2016, the NOAA Office of Exploration and Research exploration vessel, Okeanos Explorer, conducted a remotely operated vehicle (ROV) dive on a series of active `black smoker' hydrothermal vents at 3,300 m depth in the western Pacific Ocean near the Mariana Trench. The ROV system traversed 800 m along the seafloor and detected three distinct vent sites. The vent chimneys ranged in heights from 5 m to 30 m above the seafloor and vent fluid temperatures were measured as high as 337 °C. Immediately following the ROV dive, the Okeanos Explorer mapped the vent field with an 18 kHz split-beam echosounder traditionally used for fishery research and a 30 kHz multibeam echosounder with midwater capability. Six passes were made over the field, transiting at 4-5 knots on various headings. There was a clear and repeatable signal in the split-beam echogram from the venting but less obvious indication in the multibeam data. `Black smokers' have traditionally been detected using repeat conductivity-temperature-depth (CTD) `tow-yo' casts. Our field observations suggest an alternative, and potentially more efficient, method of detecting hydrothermal vent plumes within the beamwidth of the split-beam echosounder to inform ROV dive plans. Methods previously applied for locating marine gas seeps on the seafloor with split-beam echosounders can be applied to estimate the hydrothermal vent positions in this dataset and compared to the recorded ROV positions at each site. Additionally, assuming relatively stable venting and ambient conditions, the ROV position and CTD data recorded from the vehicles can be used to better understand the observed midwater acoustic backscatter signatures of the hydrothermal vent plumes.

  15. Process for off-gas particulate removal and apparatus therefor

    DOEpatents

    Carl, D.E.

    1997-10-21

    In the event of a breach in the off-gas line of a melter operation requiring closure of the line, a secondary vessel vent line is provided with a particulate collector utilizing atomization for removal of large particulates from the off-gas. The collector receives the gas containing particulates and directs a portion of the gas through outer and inner annular channels. The collector further receives a fluid, such as water, which is directed through the outer channel together with a second portion of the particulate-laden gas. The outer and inner channels have respective ring-like termination apertures concentrically disposed adjacent one another on the outer edge of the downstream side of the particulate collector. Each of the outer and inner channels curves outwardly away from the collector`s centerline in proceeding toward the downstream side of the collector. Gas flow in the outer channel maintains the fluid on the channel`s wall in the form of a ``wavy film,`` while the gas stream from the inner channel shears the fluid film as it exits the outer channel in reducing the fluid to small droplets. Droplets formed by the collector capture particulates in the gas stream by one of three mechanisms: impaction, interception or Brownian diffusion in removing the particulates. The particulate-laden droplets are removed from the fluid stream by a vessel vent condenser or mist eliminator. 4 figs.

  16. Analysis and Design of Cryogenic Pressure Vessels for Automotive Hydrogen Storage

    NASA Astrophysics Data System (ADS)

    Espinosa-Loza, Francisco Javier

    Cryogenic pressure vessels maximize hydrogen storage density by combining the high pressure (350-700 bar) typical of today's composite pressure vessels with the cryogenic temperature (as low as 25 K) typical of low pressure liquid hydrogen vessels. Cryogenic pressure vessels comprise a high-pressure inner vessel made of carbon fiber-coated metal (similar to those used for storage of compressed gas), a vacuum space filled with numerous sheets of highly reflective metalized plastic (for high performance thermal insulation), and a metallic outer jacket. High density of hydrogen storage is key to practical hydrogen-fueled transportation by enabling (1) long-range (500+ km) transportation with high capacity vessels that fit within available spaces in the vehicle, and (2) reduced cost per kilogram of hydrogen stored through reduced need for expensive structural material (carbon fiber composite) necessary to make the vessel. Low temperature of storage also leads to reduced expansion energy (by an order of magnitude or more vs. ambient temperature compressed gas storage), potentially providing important safety advantages. All this is accomplished while simultaneously avoiding fuel venting typical of cryogenic vessels for all practical use scenarios. This dissertation describes the work necessary for developing and demonstrating successive generations of cryogenic pressure vessels demonstrated at Lawrence Livermore National Laboratory. The work included (1) conceptual design, (2) detailed system design (3) structural analysis of cryogenic pressure vessels, (4) thermal analysis of heat transfer through cryogenic supports and vacuum multilayer insulation, and (5) experimental demonstration. Aside from succeeding in demonstrating a hydrogen storage approach that has established all the world records for hydrogen storage on vehicles (longest driving range, maximum hydrogen storage density, and maximum containment of cryogenic hydrogen without venting), the work also demonstrated a methodology for computationally efficient detailed modeling of cryogenic pressure vessels. The work continues with support of the US Department of Energy to demonstrate a new generation of cryogenic vessels anticipated to improve on the hydrogen storage performance figures previously imposed in this project. The author looks forward to further contributing to a future of long-range, inexpensive, and safe zero emissions transportation.

  17. Hydrothermal Vents of Juan de Fuca Ridge

    NASA Astrophysics Data System (ADS)

    Stark, Joyce

    As a member of REVEL (Research and Education: Volcanoes, Exploration and Life), I had an opportunity to participant in a scientific research cruise focused on the active volcanoes along the Juan de Fuca Ridge, the submarine spreading center off the Washington- Oregon-Canada coast. REVEL was sponsored by the National Science Foundation, University of Washington, Pennsylvania State University and the American Museum of Natural History. We studied the geological, chemical and biological processes associated with active hydrothermal systems and my research focused on the biological communities of the sulfide structures. We worked on board the Woods Hole Oceanographic Institution Vessel, R/V Atlantis and the submersible ALVIN was used to sample the "Black Smokers". As a member of the scientific party, I participated in collection and sorting of biological specimens from the vent communities, attended lectures by scientists, contributed to the cruise log website, maintained a journal and developed my own research project. It was my responsibility to bring this cutting-edge research back to the classroom.

  18. 40 CFR 63.1406 - Reactor batch process vent provisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 11 2011-07-01 2011-07-01 false Reactor batch process vent provisions... § 63.1406 Reactor batch process vent provisions. (a) Emission standards. Owners or operators of reactor... reactor batch process vent located at a new affected source shall control organic HAP emissions by...

  19. 40 CFR 63.1406 - Reactor batch process vent provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Reactor batch process vent provisions... § 63.1406 Reactor batch process vent provisions. (a) Emission standards. Owners or operators of reactor... reactor batch process vent located at a new affected source shall control organic HAP emissions by...

  20. 40 CFR 63.1104 - Process vents from continuous unit operations: applicability assessment procedures and methods.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... permit limit applicable to the process vent. (iv) Design analysis based on accepted chemical engineering... rates, halogenated process vent determinations, process vent TRE index values, and engineering... corrected to 2.3 percent moisture; or (2) The engineering assessment procedures in paragraph (k) of this...

  1. 40 CFR 63.1104 - Process vents from continuous unit operations: applicability assessment procedures and methods.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... permit limit applicable to the process vent. (iv) Design analysis based on accepted chemical engineering... rates, halogenated process vent determinations, process vent TRE index values, and engineering... corrected to 2.3 percent moisture; or (2) The engineering assessment procedures in paragraph (k) of this...

  2. 40 CFR 63.1104 - Process vents from continuous unit operations: applicability assessment procedures and methods.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... permit limit applicable to the process vent. (iv) Design analysis based on accepted chemical engineering... rates, halogenated process vent determinations, process vent TRE index values, and engineering... corrected to 2.3 percent moisture; or (2) The engineering assessment procedures in paragraph (k) of this...

  3. 40 CFR 63.1104 - Process vents from continuous unit operations: applicability assessment procedures and methods.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... permit limit applicable to the process vent. (iv) Design analysis based on accepted chemical engineering... rates, halogenated process vent determinations, process vent TRE index values, and engineering... corrected to 2.3 percent moisture; or (2) The engineering assessment procedures in paragraph (k) of this...

  4. 40 CFR 63.1407 - Non-reactor batch process vent provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Non-reactor batch process vent... § 63.1407 Non-reactor batch process vent provisions. (a) Emission standards. (1) Owners or operators of non-reactor batch process vents located at new or existing affected sources with 0.25 tons per year (0...

  5. 40 CFR 63.1407 - Non-reactor batch process vent provisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 11 2011-07-01 2011-07-01 false Non-reactor batch process vent... § 63.1407 Non-reactor batch process vent provisions. (a) Emission standards. (1) Owners or operators of non-reactor batch process vents located at new or existing affected sources with 0.25 tons per year (0...

  6. 40 CFR 63.1430 - Process vent reporting and recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... is subject to the Group 1 batch process vent control requirements for nonepoxide HAP emissions from...) Records to demonstrate compliance. The owner or operator complying with the process vent control...: (1) When using a flare to comply with the process vent control requirements in § 63.1425(b)(2)(i), (c...

  7. Device for accurately measuring mass flow of gases

    DOEpatents

    Hylton, J.O.; Remenyik, C.J.

    1994-08-09

    A device for measuring mass flow of gases which utilizes a substantially buoyant pressure vessel suspended within a fluid/liquid in an enclosure is disclosed. The pressure vessel is connected to a weighing device for continuously determining weight change of the vessel as a function of the amount of gas within the pressure vessel. In the preferred embodiment, this pressure vessel is formed from inner and outer right circular cylindrical hulls, with a volume between the hulls being vented to the atmosphere external the enclosure. The fluid/liquid, normally in the form of water typically with an added detergent, is contained within an enclosure with the fluid/liquid being at a level such that the pressure vessel is suspended beneath this level but above a bottom of the enclosure. The buoyant pressure vessel can be interconnected with selected valves to an auxiliary pressure vessel so that initial flow can be established to or from the auxiliary pressure vessel prior to flow to or from the buoyant pressure vessel. 5 figs.

  8. Device for accurately measuring mass flow of gases

    DOEpatents

    Hylton, James O.; Remenyik, Carl J.

    1994-01-01

    A device for measuring mass flow of gases which utilizes a substantially buoyant pressure vessel suspended within a fluid/liquid in an enclosure. The pressure vessel is connected to a weighing device for continuously determining weight change of the vessel as a function of the amount of gas within the pressure vessel. In the preferred embodiment, this pressure vessel is formed from inner and outer right circular cylindrical hulls, with a volume between the hulls being vented to the atmosphere external the enclosure. The fluid/liquid, normally in the form of water typically with an added detergent, is contained within an enclosure with the fluid/liquid being at a level such that the pressure vessel is suspended beneath this level but above a bottom of the enclosure. The buoyant pressure vessel can be interconnected with selected valves to an auxiliary pressure vessel so that initial flow can be established to or from the auxiliary pressure vessel prior to flow to or from the buoyant pressure vessel.

  9. Explosive destruction system for disposal of chemical munitions

    DOEpatents

    Tschritter, Kenneth L [Livermore, CA; Haroldsen, Brent L [Manteca, CA; Shepodd, Timothy J [Livermore, CA; Stofleth, Jerome H [Albuquerque, NM; DiBerardo, Raymond A [Baltimore, MD

    2005-04-19

    An explosive destruction system and method for safely destroying explosively configured chemical munitions. The system comprises a sealable, gas-tight explosive containment vessel, a fragment suppression system positioned in said vessel, and shaped charge means for accessing the interior of the munition when the munition is placed within the vessel and fragment suppression system. Also provided is a means for treatment and neutralization of the munition's chemical fills, and means for heating and agitating the contents of the vessel. The system is portable, rapidly deployable and provides the capability of explosively destroying and detoxifying chemical munitions within a gas-tight enclosure so that there is no venting of toxic or hazardous chemicals during detonation.

  10. 46 CFR 197.505 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... vessel. Emergency means an occurrence, such as an equipment failure, a container rupture, or a control... cargo transfer operations involving connecting or disconnecting liquid or vapor hoses; cargo tank gauging and sampling; and cargo tank gas freeing, venting, and cleaning. Performance standard means the...

  11. 46 CFR 197.505 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... vessel. Emergency means an occurrence, such as an equipment failure, a container rupture, or a control... cargo transfer operations involving connecting or disconnecting liquid or vapor hoses; cargo tank gauging and sampling; and cargo tank gas freeing, venting, and cleaning. Performance standard means the...

  12. 46 CFR 197.505 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... vessel. Emergency means an occurrence, such as an equipment failure, a container rupture, or a control... cargo transfer operations involving connecting or disconnecting liquid or vapor hoses; cargo tank gauging and sampling; and cargo tank gas freeing, venting, and cleaning. Performance standard means the...

  13. 46 CFR 197.505 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... vessel. Emergency means an occurrence, such as an equipment failure, a container rupture, or a control... cargo transfer operations involving connecting or disconnecting liquid or vapor hoses; cargo tank gauging and sampling; and cargo tank gas freeing, venting, and cleaning. Performance standard means the...

  14. 46 CFR 197.505 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... vessel. Emergency means an occurrence, such as an equipment failure, a container rupture, or a control... cargo transfer operations involving connecting or disconnecting liquid or vapor hoses; cargo tank gauging and sampling; and cargo tank gas freeing, venting, and cleaning. Performance standard means the...

  15. Submarine and Autonomous Vessel Proliferation: Implications for Future Strategic Stability at Sea

    DTIC Science & Technology

    2012-12-01

    missile.4 These important details of the legacy of the Cold War at sea are too often forgotten in today’s retelling of the story . Yet, as CDR (USN...vented deadly fumes. The damaged and still-burning vessel was scuttled with its nuclear weapons and reactors aboard. 8 Pavel Podvig, ed., Russian ...exception of China in the 1950s,13 the Russians generally did not provide production technology and refrained from offering sophisticated offensive systems

  16. 40 CFR 63.2465 - What requirements must I meet for process vents that emit hydrogen halide and halogen HAP or HAP...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... process vents that emit hydrogen halide and halogen HAP or HAP metals? 63.2465 Section 63.2465 Protection... Compliance Requirements § 63.2465 What requirements must I meet for process vents that emit hydrogen halide... section. (b) If any process vents within a process emit hydrogen halide and halogen HAP, you must...

  17. 40 CFR Table 4 to Subpart Vvvvvv... - Emission Limits and Compliance Requirements for Metal HAP Process Vents

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Requirements for Metal HAP Process Vents 4 Table 4 to Subpart VVVVVV of Part 63 Protection of Environment... of Part 63—Emission Limits and Compliance Requirements for Metal HAP Process Vents As required in § 63.11496(f), you must comply with the requirements for metal HAP process vents as shown in the...

  18. 40 CFR 63.491 - Batch front-end process vents-recordkeeping requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (b)(2): (i) For an incinerator or non-combustion control device, the percent reduction of organic HAP... the process vent stream is introduced with combustion air or is used as a secondary fuel and is not... combustion device to control halogenated batch front-end process vents or halogenated aggregate batch vent...

  19. CFD analysis of gas explosions vented through relief pipes.

    PubMed

    Ferrara, G; Di Benedetto, A; Salzano, E; Russo, G

    2006-09-21

    Vent devices for gas and dust explosions are often ducted to safe locations by means of relief pipes. However, the presence of the duct increases the severity of explosion if compared to simply vented vessels (i.e. compared to cases where no duct is present). Besides, the identification of the key phenomena controlling the violence of explosion has not yet been gained. Multidimensional models coupling, mass, momentum and energy conservation equations can be valuable tools for the analysis of such complex explosion phenomena. In this work, gas explosions vented through ducts have been modelled by a two-dimensional (2D) axi-symmetric computational fluid dynamic (CFD) model based on the unsteady Reynolds Averaged Navier Stokes (RANS) approach in which the laminar, flamelet and distributed combustion models have been implemented. Numerical test have been carried out by varying ignition position, duct diameter and length. Results have evidenced that the severity of ducted explosions is mainly driven by the vigorous secondary explosion occurring in the duct (burn-up) rather than by the duct flow resistance or acoustic enhancement. Moreover, it has been found out that the burn-up affects explosion severity due to the reduction of venting rate rather than to the burning rate enhancement through turbulization.

  20. 40 CFR 63.1361 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... hatches, sampling ports, and gauge wells provided that each opening is closed when not in use. Examples of... uncontrolled organic HAP emissions from the sum of all process vents are greater than or equal to 0.15 Mg/yr... vents are greater than or equal to 6.8 Mg/yr. Group 2 process vent means any process vent that does not...

  1. 40 CFR 63.1361 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... hatches, sampling ports, and gauge wells provided that each opening is closed when not in use. Examples of... uncontrolled organic HAP emissions from the sum of all process vents are greater than or equal to 0.15 Mg/yr... vents are greater than or equal to 6.8 Mg/yr. Group 2 process vent means any process vent that does not...

  2. Nuclear reactor vessel fuel thermal insulating barrier

    DOEpatents

    Keegan, C. Patrick; Scobel, James H.; Wright, Richard F.

    2013-03-19

    The reactor vessel of a nuclear reactor installation which is suspended from the cold leg nozzles in a reactor cavity is provided with a lower thermal insulating barrier spaced from the reactor vessel that has a hemispherical lower section that increases in volume from the center line of the reactor to the outer extent of the diameter of the thermal insulating barrier and smoothly transitions up the side walls of the vessel. The space between the thermal insulating harrier and the reactor vessel forms a chamber which can be flooded with cooling water through passive valving to directly cool the reactor vessel in the event of a severe accident. The passive inlet valve for the cooling water includes a buoyant door that is normally maintained sealed under its own weight and floats open when the cavity is Hooded. Passively opening steam vents are also provided.

  3. 40 CFR Table 2 to Subpart Ffff of... - Emission Limits and Work Practice Standards for Batch Process Vents

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: Miscellaneous Organic Chemical Manufacturing Pt. 63, Subpt. FFFF, Table 2 Table 2 to Subpart FFFF of Part 63... vents a. Reduce collective uncontrolled organic HAP emissions from the sum of all batch process vents... applicable. b. Reduce collective uncontrolled organic HAP emissions from the sum of all batch process vents...

  4. 40 CFR Table 2 to Subpart Ffff of... - Emission Limits and Work Practice Standards for Batch Process Vents

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...: Miscellaneous Organic Chemical Manufacturing Pt. 63, Subpt. FFFF, Table 2 Table 2 to Subpart FFFF of Part 63... vents a. Reduce collective uncontrolled organic HAP emissions from the sum of all batch process vents... applicable. b. Reduce collective uncontrolled organic HAP emissions from the sum of all batch process vents...

  5. 76 FR 22875 - Atlantic Coastal Fisheries Cooperative Management Act Provisions; General Provisions for Domestic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... commercial fishing vessels from the following Federal American lobster regulations: Trap escape vent... traps to collect scientific information on American lobsters, including juveniles, in Lobster... the already present New Jersey At-Sea Lobster Observer Program and New Jersey commercial fishermen...

  6. The effect of ignition location on explosion venting of hydrogen-air mixtures

    NASA Astrophysics Data System (ADS)

    Cao, Y.; Guo, J.; Hu, K.; Xie, L.; Li, B.

    2017-07-01

    The effect of ignition location and vent burst pressure on the internal pressure-time history and external flame propagation was investigated for vented explosions of hydrogen-air mixtures in a small cylindrical vessel. A high-speed camera was used to record videos of the external flame while pressure transducers were used to record pressure-time histories. It was found that central ignition always leads to the maximum internal peak overpressure, and front ignition resulted in the lowest value of internal peak overpressure. The internal peak overpressures are increased corresponding to the increase in the vent burst pressure in the cases of central and rear ignition. Because of the effect of acoustic oscillations, the phenomenon of oscillations is observed in the internal pressure profile for the case of front ignition. The pressure oscillations for the cases of rear and central ignition are triggered by external explosions. The behavior of flames outside the chamber is significantly associated with the internal pressure of the chamber so that the velocity of the jet flame is closely related to the internal overpressure peak.

  7. 40 CFR 63.1322 - Batch process vents-reference control technology.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 12 2013-07-01 2013-07-01 false Batch process vents-reference control... (CONTINUED) National Emission Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins § 63.1322 Batch process vents—reference control technology. (a) Batch process vents. The owner or...

  8. 40 CFR 63.1322 - Batch process vents-reference control technology.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 12 2012-07-01 2011-07-01 true Batch process vents-reference control technology. 63.1322 Section 63.1322 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Batch process vents—reference control technology. (a) Batch process vents. The owner or operator of a...

  9. 40 CFR 63.1322 - Batch process vents-reference control technology.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 12 2014-07-01 2014-07-01 false Batch process vents-reference control technology. 63.1322 Section 63.1322 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... § 63.1322 Batch process vents—reference control technology. (a) Batch process vents. The owner or...

  10. 40 CFR 63.1322 - Batch process vents-reference control technology.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 11 2011-07-01 2011-07-01 false Batch process vents-reference control technology. 63.1322 Section 63.1322 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Batch process vents—reference control technology. (a) Batch process vents. The owner or operator of a...

  11. 40 CFR 63.1322 - Batch process vents-reference control technology.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Batch process vents-reference control technology. 63.1322 Section 63.1322 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Batch process vents—reference control technology. (a) Batch process vents. The owner or operator of a...

  12. 46 CFR 127.270 - Location of accommodations and pilothouse.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 127.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS... waterline. (d) No hawse pipe or chain pipe may pass through accommodations for crew members or offshore... accommodations and chain lockers, cargo spaces, or machinery spaces. (f) No sounding tubes, or vents from fuel...

  13. 46 CFR 127.270 - Location of accommodations and pilothouse.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 127.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS... waterline. (d) No hawse pipe or chain pipe may pass through accommodations for crew members or offshore... accommodations and chain lockers, cargo spaces, or machinery spaces. (f) No sounding tubes, or vents from fuel...

  14. 46 CFR 127.270 - Location of accommodations and pilothouse.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 127.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS... waterline. (d) No hawse pipe or chain pipe may pass through accommodations for crew members or offshore... accommodations and chain lockers, cargo spaces, or machinery spaces. (f) No sounding tubes, or vents from fuel...

  15. 46 CFR 127.250 - Ventilation for enclosed spaces.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Ventilation for enclosed spaces. 127.250 Section 127.250... ARRANGEMENTS Particular Construction and Arrangements § 127.250 Ventilation for enclosed spaces. (a) Each enclosed space within the vessel must be properly vented or ventilated. Means must be provided for closing...

  16. 46 CFR 127.250 - Ventilation for enclosed spaces.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Ventilation for enclosed spaces. 127.250 Section 127.250... ARRANGEMENTS Particular Construction and Arrangements § 127.250 Ventilation for enclosed spaces. (a) Each enclosed space within the vessel must be properly vented or ventilated. Means must be provided for closing...

  17. 46 CFR 127.250 - Ventilation for enclosed spaces.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Ventilation for enclosed spaces. 127.250 Section 127.250... ARRANGEMENTS Particular Construction and Arrangements § 127.250 Ventilation for enclosed spaces. (a) Each enclosed space within the vessel must be properly vented or ventilated. Means must be provided for closing...

  18. 46 CFR 127.250 - Ventilation for enclosed spaces.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Ventilation for enclosed spaces. 127.250 Section 127.250... ARRANGEMENTS Particular Construction and Arrangements § 127.250 Ventilation for enclosed spaces. (a) Each enclosed space within the vessel must be properly vented or ventilated. Means must be provided for closing...

  19. 46 CFR 127.250 - Ventilation for enclosed spaces.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Ventilation for enclosed spaces. 127.250 Section 127.250... ARRANGEMENTS Particular Construction and Arrangements § 127.250 Ventilation for enclosed spaces. (a) Each enclosed space within the vessel must be properly vented or ventilated. Means must be provided for closing...

  20. 46 CFR 154.804 - Vacuum protection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Design, Construction and Equipment Cargo Vent.... (2) There must be a pressure switch that operates an audible and visual alarm in the cargo control station identifying the tank and the alarm condition and a remote group audible and visual alarm in the...

  1. 46 CFR 154.804 - Vacuum protection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Design, Construction and Equipment Cargo Vent.... (2) There must be a pressure switch that operates an audible and visual alarm in the cargo control station identifying the tank and the alarm condition and a remote group audible and visual alarm in the...

  2. 46 CFR 154.804 - Vacuum protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Design, Construction and Equipment Cargo Vent.... (2) There must be a pressure switch that operates an audible and visual alarm in the cargo control station identifying the tank and the alarm condition and a remote group audible and visual alarm in the...

  3. 46 CFR 127.270 - Location of accommodations and pilothouse.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 127.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS... waterline. (d) No hawse pipe or chain pipe may pass through accommodations for crew members or offshore... accommodations and chain lockers, cargo spaces, or machinery spaces. (f) No sounding tubes, or vents from fuel...

  4. 46 CFR 127.270 - Location of accommodations and pilothouse.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 127.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS... waterline. (d) No hawse pipe or chain pipe may pass through accommodations for crew members or offshore... accommodations and chain lockers, cargo spaces, or machinery spaces. (f) No sounding tubes, or vents from fuel...

  5. Mineralogy and Geochemistry from Trollveggen Vent Field Chimneys and Metalliferous Sediments (Mohns Ridge, West Jan Mayen Fracture Zone at 71°N)

    NASA Astrophysics Data System (ADS)

    Dias, S.; Cruz, I.; Fonseca, R.; Barriga, F. J.; Pedersen, R.

    2010-12-01

    The Jan Mayen vent fields were discovered in the Mohns Ridge during an expedition with the Norwegian research vessel "G.O. Sars" in July 2005. They comprise two main active areas: (1) Soria Moria and (2) Gallionella Garden & Trollveggen. The Trollveggen vent field is located at depths of 700-750 m. Venting takes place mainly through white smoker chimneys with fluid temperatures reaching up to 260-270°C. Here we present mineralogical and geochemical data from vent chimneys and metalliferous sediments collected at the Trollveggen vent field with an ROV. Cross-sections of chimneys present evident mineralogical zonation, showing acicular barite crystals in the outer parts and sulfide enrichments in the interior (Sph + Cpy +/- Py - Po). Sediments are mainly formed by vent fragments but also by minerals precipitated by diffuse fluid circulation, showing a mineral assemblage similar to that of chimneys. Microprobe analyses were obtained both in sulfates and sulphides revealing a particular sphalerite composition, characterized by low Fe (< 2%) and high total trace metal contents (up to 4%, including Cu, Ag and Au). Geochemical profiles of gravity cores collected in the area surrounding Jan Mayen were also performed in order to investigate the presence of additional hydrothermal activity in the area. Total geochemical analyses showed a slight enrichment in trace metals, such as Cu, Zn and Fe, with exception of one core that reached 85 ppm for Cu, 150 ppm for Zn and 20% for Fe. The metal enrichment in this core suggests hydrothermal activity in the neighboring area.

  6. Passive containment cooling system

    DOEpatents

    Billig, P.F.; Cooke, F.E.; Fitch, J.R.

    1994-01-25

    A passive containment cooling system includes a containment vessel surrounding a reactor pressure vessel and defining a drywell therein containing a non-condensable gas. An enclosed wetwell pool is disposed inside the containment vessel, and a gravity driven cooling system (GDCS) pool is disposed above the wetwell pool in the containment vessel and is vented to the drywell. An isolation pool is disposed above the GDCS pool and includes an isolation condenser therein. The condenser has an inlet line disposed in flow communication with the drywell for receiving the non-condensable gas along with any steam released therein following a loss-of-coolant accident (LOCA). The condenser also has an outlet line disposed in flow communication with the drywell for returning to the drywell both liquid condensate produced upon cooling of the steam and the non-condensable gas for reducing pressure within the containment vessel following the LOCA. 1 figure.

  7. Passive containment cooling system

    DOEpatents

    Billig, Paul F.; Cooke, Franklin E.; Fitch, James R.

    1994-01-01

    A passive containment cooling system includes a containment vessel surrounding a reactor pressure vessel and defining a drywell therein containing a non-condensable gas. An enclosed wetwell pool is disposed inside the containment vessel, and a gravity driven cooling system (GDCS) pool is disposed above the wetwell pool in the containment vessel and is vented to the drywell. An isolation pool is disposed above the GDCS pool and includes an isolation condenser therein. The condenser has an inlet line disposed in flow communication with the drywell for receiving the non-condensable gas along with any steam released therein following a loss-of-coolant accident (LOCA). The condenser also has an outlet line disposed in flow communication with the drywell for returning to the drywell both liquid condensate produced upon cooling of the steam and the non-condensable gas for reducing pressure within the containment vessel following the LOCA.

  8. 40 CFR 63.487 - Batch front-end process vents-reference control technology.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 63.487 Batch front-end process vents—reference control technology. (a) Batch front-end process vents... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Batch front-end process vents-reference control technology. 63.487 Section 63.487 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  9. Hydrogen Fire in a Storage Vessel

    NASA Technical Reports Server (NTRS)

    Hester, Zena M.

    2010-01-01

    On October 23, 2007, the operations team began a procedure to sample the Liquid Hydrogen (LH2) storage vessels ("tanks"), and associated transfer system. This procedure was being performed to determine the conditions within the system, and if necessary, to purge the system of any excess Gaseous Hydrogen (GH2) in preparation for reactivation of the system. The system had not been used since 2003. The LH2 storage system contains two (2) spherical pressure vessels of 225,000 gallons in volume, with a maximum working pressure (MAWP) of 50 psig. Eight inch transfer piping connects them to the usage point. Operations began with activation of the burnstack for the LH2 storage area. Pneumatic (GN2) systems in the storage area were then activated and checked. Pressurization of storage tank number 1 with gaseous nitrogen (GN2) was initiated, with a target pressure of 10 psig, at which point samples were planned to be taken. At 5 psig, a loud noise was heard in the upper area of tank number 2. Smoke was seen exiting the burnstack and from the insulation on vent lines for both tanks. At this time tank number 1 was vented and the pressurization system was secured. The mishap resulted in physical damage to both storage tanks, as well as to some of the piping for both tanks. Corrective action included repair of the damaged hardware by a qualified contractor. Preventive action included documented organizational policy and procedures for establishing standby and mothball conditions for facilities and equipment, including provisions as detailed in the investigation report recommendations: Recommendation 1: The using organization should define necessary activities in order to place hydrogen systems in long term periods of inactivity. The defined activities should address requirements for rendering inert, isolation (i.e., physical disconnect, double block and bleed, etc.) and periodic monitoring. Recommendation 2: The using organization should develop a process to periodically monitor hazardous systems for proper configuration (i.e., a daily/weekly/monthly check sheet to verify critical purges are active).

  10. Continuous coal processing method

    NASA Technical Reports Server (NTRS)

    Ryason, P. R. (Inventor)

    1980-01-01

    A coal pump is provided in which solid coal is heated in the barrel of an extruder under pressure to a temperature at which the coal assumes plastic properties. The coal is continuously extruded, without static zones, using, for example, screw extrusion preferably without venting through a reduced diameter die to form a dispersed spray. As a result, the dispersed coal may be continuously injected into vessels or combustors at any pressure up to the maximum pressure developed in the extrusion device. The coal may be premixed with other materials such as desulfurization aids or reducible metal ores so that reactions occur, during or after conversion to its plastic state. Alternatively, the coal may be processed and caused to react after extrusion, through the die, with, for example, liquid oxidizers, whereby a coal reactor is provided.

  11. 40 CFR 63.1321 - Batch process vents provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins § 63.1321 Batch process vents..., owners and operators of new and existing affected sources with batch process vents shall comply with the... applicable reporting requirements in § 63.1327. (b) New SAN batch affected sources. Owners and operators of...

  12. 40 CFR 63.764 - General standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in paragraphs (c)(1) through (3) of this section. (1) For each glycol dehydration unit process vent... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The owner or operator shall... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The monitoring requirements...

  13. 40 CFR 63.764 - General standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in paragraphs (c)(1) through (3) of this section. (1) For each glycol dehydration unit process vent... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The owner or operator shall... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The monitoring requirements...

  14. 40 CFR 63.764 - General standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in paragraphs (c)(1) through (3) of this section. (1) For each glycol dehydration unit process vent... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The owner or operator shall... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The monitoring requirements...

  15. 40 CFR 63.1275 - Glycol dehydration unit process vent standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 12 2014-07-01 2014-07-01 false Glycol dehydration unit process vent... Storage Facilities § 63.1275 Glycol dehydration unit process vent standards. (a) This section applies to each glycol dehydration unit subject to this subpart that must be controlled for air emissions as...

  16. 40 CFR 63.1275 - Glycol dehydration unit process vent standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 12 2013-07-01 2013-07-01 false Glycol dehydration unit process vent... Storage Facilities § 63.1275 Glycol dehydration unit process vent standards. (a) This section applies to each glycol dehydration unit subject to this subpart that must be controlled for air emissions as...

  17. 40 CFR 63.764 - General standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in paragraphs (c)(1) through (3) of this section. (1) For each glycol dehydration unit process vent... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The owner or operator shall... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The monitoring requirements...

  18. 40 CFR 63.764 - General standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... in paragraphs (c)(1) through (3) of this section. (1) For each glycol dehydration unit process vent... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The owner or operator shall... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The monitoring requirements...

  19. 40 CFR 63.1016 - Alternative means of emission limitation: Enclosed-vented process units.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Alternative means of emission limitation: Enclosed-vented process units. 63.1016 Section 63.1016 Protection of Environment ENVIRONMENTAL... § 63.1016 Alternative means of emission limitation: Enclosed-vented process units. (a) Use of closed...

  20. 40 CFR 63.1016 - Alternative means of emission limitation: Enclosed-vented process units.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 10 2011-07-01 2011-07-01 false Alternative means of emission limitation: Enclosed-vented process units. 63.1016 Section 63.1016 Protection of Environment ENVIRONMENTAL... § 63.1016 Alternative means of emission limitation: Enclosed-vented process units. (a) Use of closed...

  1. 40 CFR 63.113 - Process vent provisions-reference control technology.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 10 2012-07-01 2012-07-01 false Process vent provisions-reference control technology. 63.113 Section 63.113 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 63.113 Process vent provisions—reference control technology. (a) The owner or operator of a Group 1...

  2. 40 CFR 63.113 - Process vent provisions-reference control technology.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Process vent provisions-reference control technology. 63.113 Section 63.113 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 63.113 Process vent provisions—reference control technology. (a) The owner or operator of a Group 1...

  3. 40 CFR 63.113 - Process vent provisions-reference control technology.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Process vent provisions-reference control technology. 63.113 Section 63.113 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 63.113 Process vent provisions—reference control technology. (a) The owner or operator of a Group 1...

  4. 40 CFR 63.113 - Process vent provisions-reference control technology.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 10 2014-07-01 2014-07-01 false Process vent provisions-reference control technology. 63.113 Section 63.113 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 63.113 Process vent provisions—reference control technology. (a) The owner or operator of a Group 1...

  5. 40 CFR 63.113 - Process vent provisions-reference control technology.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Process vent provisions-reference control technology. 63.113 Section 63.113 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 63.113 Process vent provisions—reference control technology. (a) The owner or operator of a Group 1...

  6. 40 CFR 63.7885 - What are the general standards I must meet for my affected process vents?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... meet for my affected process vents? 63.7885 Section 63.7885 Protection of Environment ENVIRONMENTAL... Remediation General Standards § 63.7885 What are the general standards I must meet for my affected process...) You determine for the remediation material treated or managed by the process vented through the...

  7. 40 CFR 63.7885 - What are the general standards I must meet for my affected process vents?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... meet for my affected process vents? 63.7885 Section 63.7885 Protection of Environment ENVIRONMENTAL... Remediation General Standards § 63.7885 What are the general standards I must meet for my affected process...) You determine for the remediation material treated or managed by the process vented through the...

  8. 40 CFR 63.7885 - What are the general standards I must meet for my affected process vents?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... meet for my affected process vents? 63.7885 Section 63.7885 Protection of Environment ENVIRONMENTAL... Remediation General Standards § 63.7885 What are the general standards I must meet for my affected process...) You determine for the remediation material treated or managed by the process vented through the...

  9. 40 CFR 63.7885 - What are the general standards I must meet for my affected process vents?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... meet for my affected process vents? 63.7885 Section 63.7885 Protection of Environment ENVIRONMENTAL... Remediation General Standards § 63.7885 What are the general standards I must meet for my affected process...) You determine for the remediation material treated or managed by the process vented through the...

  10. 40 CFR 63.640 - Applicability and designation of affected source.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... plant vents; and (5) Emission points routed to a fuel gas system, as defined in § 63.641 of this subpart. No testing, monitoring, recordkeeping, or reporting is required for refinery fuel gas systems or emission points routed to refinery fuel gas systems. (e) The owner or operator of a storage vessel...

  11. 40 CFR 63.640 - Applicability and designation of affected source.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plant vents; and (5) Emission points routed to a fuel gas system, as defined in § 63.641 of this subpart. No testing, monitoring, recordkeeping, or reporting is required for refinery fuel gas systems or emission points routed to refinery fuel gas systems. (e) The owner or operator of a storage vessel...

  12. 46 CFR 169.315 - Ventilation (other than machinery spaces).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Ventilation (other than machinery spaces). 169.315... spaces). (a) All enclosed spaces within the vessel must be properly ventilated in a manner suitable for the purpose of the space. (b) A means must be provided to close off all vents and ventilators. (c...

  13. 46 CFR 169.315 - Ventilation (other than machinery spaces).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Ventilation (other than machinery spaces). 169.315... spaces). (a) All enclosed spaces within the vessel must be properly ventilated in a manner suitable for the purpose of the space. (b) A means must be provided to close off all vents and ventilators. (c...

  14. 46 CFR 154.1725 - Ethylene oxide.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Ethylene oxide. 154.1725 Section 154.1725 Shipping COAST....1725 Ethylene oxide. (a) A vessel carrying ethylene oxide must: (1) Have cargo piping, vent piping, and... space of an ethylene oxide cargo tank for a period of 30 days under the condition of paragraph (e) of...

  15. 46 CFR 169.315 - Ventilation (other than machinery spaces).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Ventilation (other than machinery spaces). 169.315... spaces). (a) All enclosed spaces within the vessel must be properly ventilated in a manner suitable for the purpose of the space. (b) A means must be provided to close off all vents and ventilators. (c...

  16. 46 CFR 169.315 - Ventilation (other than machinery spaces).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Ventilation (other than machinery spaces). 169.315... spaces). (a) All enclosed spaces within the vessel must be properly ventilated in a manner suitable for the purpose of the space. (b) A means must be provided to close off all vents and ventilators. (c...

  17. 40 CFR 63.983 - Closed vent systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Closed vent systems. 63.983 Section 63... Emission Standards for Closed Vent Systems, Control Devices, Recovery Devices and Routing to a Fuel Gas System or a Process § 63.983 Closed vent systems. (a) Closed vent system equipment and operating...

  18. 40 CFR Table 1 to Subpart Ffff of... - Emission Limits and Work Practice Standards for Continuous Process Vents

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: Miscellaneous Organic Chemical Manufacturing Pt. 63, Subpt. FFFF, Table 1 Table 1 to Subpart FFFF of Part 63... vent a. Not applicable i. Reduce emissions of total organic HAP by ≥98 percent by weight or to an outlet process concentration ≤20 ppmv as organic HAP or TOC by venting emissions through a closed-vent...

  19. 40 CFR Table 1 to Subpart Ffff of... - Emission Limits and Work Practice Standards for Continuous Process Vents

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...: Miscellaneous Organic Chemical Manufacturing Pt. 63, Subpt. FFFF, Table 1 Table 1 to Subpart FFFF of Part 63... vent a. Not applicable i. Reduce emissions of total organic HAP by ≥98 percent by weight or to an outlet process concentration ≤20 ppmv as organic HAP or TOC by venting emissions through a closed-vent...

  20. 40 CFR 63.1426 - Process vent requirements for determining organic HAP concentration, control efficiency, and...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Production § 63.1426 Process vent requirements for determining organic HAP concentration, control efficiency..., total organic HAP, or as TOC minus methane and ethane according to the procedures specified. When... methane and ethane) concentrations in all process vent streams and primary and secondary fuels introduced...

  1. 40 CFR 63.1275 - Glycol dehydration unit process vent standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 12 2012-07-01 2011-07-01 true Glycol dehydration unit process vent... Facilities § 63.1275 Glycol dehydration unit process vent standards. (a) This section applies to each glycol dehydration unit subject to this subpart with an actual annual average natural gas flowrate equal to or...

  2. 40 CFR 63.1275 - Glycol dehydration unit process vent standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Glycol dehydration unit process vent... Facilities § 63.1275 Glycol dehydration unit process vent standards. (a) This section applies to each glycol dehydration unit subject to this subpart with an actual annual average natural gas flowrate equal to or...

  3. 40 CFR 63.765 - Glycol dehydration unit process vent standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 11 2013-07-01 2013-07-01 false Glycol dehydration unit process vent... Facilities § 63.765 Glycol dehydration unit process vent standards. (a) This section applies to each glycol dehydration unit subject to this subpart that must be controlled for air emissions as specified in either...

  4. 40 CFR 63.765 - Glycol dehydration unit process vent standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 10 2011-07-01 2011-07-01 false Glycol dehydration unit process vent... Facilities § 63.765 Glycol dehydration unit process vent standards. (a) This section applies to each glycol dehydration unit subject to this subpart with an actual annual average natural gas flowrate equal to or...

  5. 40 CFR 63.765 - Glycol dehydration unit process vent standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Glycol dehydration unit process vent... Facilities § 63.765 Glycol dehydration unit process vent standards. (a) This section applies to each glycol dehydration unit subject to this subpart that must be controlled for air emissions as specified in either...

  6. 40 CFR 63.765 - Glycol dehydration unit process vent standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Glycol dehydration unit process vent... Facilities § 63.765 Glycol dehydration unit process vent standards. (a) This section applies to each glycol dehydration unit subject to this subpart with an actual annual average natural gas flowrate equal to or...

  7. 40 CFR 63.1275 - Glycol dehydration unit process vent standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 11 2011-07-01 2011-07-01 false Glycol dehydration unit process vent... Facilities § 63.1275 Glycol dehydration unit process vent standards. (a) This section applies to each glycol dehydration unit subject to this subpart with an actual annual average natural gas flowrate equal to or...

  8. 40 CFR 63.765 - Glycol dehydration unit process vent standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 11 2012-07-01 2012-07-01 false Glycol dehydration unit process vent... Facilities § 63.765 Glycol dehydration unit process vent standards. (a) This section applies to each glycol dehydration unit subject to this subpart with an actual annual average natural gas flowrate equal to or...

  9. 40 CFR 63.2455 - What requirements must I meet for continuous process vents?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CATEGORIES National Emission Standards for Hazardous Air Pollutants: Miscellaneous Organic Chemical... any continuous process vent that is combined with Group 1 batch process vents before a control device or recovery device because the requirements of § 63.2450(c)(2)(i) apply to the combined stream. (2...

  10. 40 CFR 63.118 - Process vent provisions-periodic reporting and recordkeeping requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Process vent provisions-periodic..., and Wastewater § 63.118 Process vent provisions—periodic reporting and recordkeeping requirements. (a... table 3 of this subpart or specified by the Administrator in accordance with § 63.114(c) and § 63.117(e...

  11. 40 CFR 63.118 - Process vent provisions-periodic reporting and recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Process vent provisions-periodic..., and Wastewater § 63.118 Process vent provisions—periodic reporting and recordkeeping requirements. (a... table 3 of this subpart or specified by the Administrator in accordance with §§ 63.114(c) and 63.117(e...

  12. 40 CFR 63.118 - Process vent provisions-periodic reporting and recordkeeping requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 10 2012-07-01 2012-07-01 false Process vent provisions-periodic..., and Wastewater § 63.118 Process vent provisions—periodic reporting and recordkeeping requirements. (a... table 3 of this subpart or specified by the Administrator in accordance with §§ 63.114(c) and 63.117(e...

  13. 40 CFR 63.644 - Monitoring provisions for miscellaneous process vents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) of this section, each owner or operator of a Group 1 miscellaneous process vent that uses a... detecting the presence of a pilot flame is required. (3) Any boiler or process heater with a design heat... less than 44 megawatts design heat capacity where the vent stream is not introduced into the flame zone...

  14. 40 CFR 63.644 - Monitoring provisions for miscellaneous process vents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) of this section, each owner or operator of a Group 1 miscellaneous process vent that uses a... detecting the presence of a pilot flame is required. (3) Any boiler or process heater with a design heat... less than 44 megawatts design heat capacity where the vent stream is not introduced into the flame zone...

  15. First Discovery and Investigation of a High-Temperature Hydrothermal Vent Field on the Ultra- Slow Spreading Southwest Indian Ridge

    NASA Astrophysics Data System (ADS)

    Tao, C.; Lin, J.; Guo, S.; Chen, Y. J.; Wu, G.; Han, X.; German, C. R.; Yoerger, D. R.; Zhu, J.; Zhou, N.; Su, X.; Baker, E. T.; Party, S.

    2007-12-01

    Two recent cruises on board the Chinese research vessel Dayang Yihao have successfully investigated the first active hydrothermal vent field to be located along the ultraslow spreading Southwest Indian Ridge (SWIR) and collected hydrothermal sulfide deposit samples. The newly discovered hydrothermal vent field is located on the western end of a magmatically robust spreading segment immediately west of the Gallieni transform fault. Preliminary evidence of strong turbidity anomalies was first measured during a Nov. 2005 cruise on board Dayang Yihao (InterRidge News, vol. 15, pp. 33-34, 2006). Color video footages of the seafloor in the vent-field area were first obtained by a deep-towed video camera in February 2007 during DY115-19 Leg 1, when significant water column turbidity anomalies, noticeable temperature anomalies and methane anomalies were also measured. The vent field was then precisely located, mapped, and photographed in great detail in February- March 2007 during the DY115-19 Leg 2, using the autonomous underwater vehicle ABE of the Woods Hole Oceanographic Institution. A high-resolution bathymetric map, more than 5,000 near-bottom color photos, and several types of water column data were all obtained during three phases of ABE dives. Within the approximately 120-m-long by 100-m-wide hydrothermal field, three groups of active high-temperature vents were identified and color images of black smokers and associated biological communities were obtained from ABE, flying 5 m above the seafloor. Hydrothermal sulfide deposits were then successfully obtained using a TV-guided grab.

  16. First Discovery and Investigation of a High-Temperature Hydrothermal Vent Field on the Ultra- Slow Spreading Southwest Indian Ridge

    NASA Astrophysics Data System (ADS)

    Tao, C.; Lin, J.; Guo, S.; Chen, Y. J.; Wu, G.; Han, X.; German, C. R.; Yoerger, D. R.; Zhu, J.; Zhou, N.; Su, X.; Baker, E. T.; Party, S.

    2004-12-01

    Two recent cruises on board the Chinese research vessel Dayang Yihao have successfully investigated the first active hydrothermal vent field to be located along the ultraslow spreading Southwest Indian Ridge (SWIR) and collected hydrothermal sulfide deposit samples. The newly discovered hydrothermal vent field is located on the western end of a magmatically robust spreading segment immediately west of the Gallieni transform fault. Preliminary evidence of strong turbidity anomalies was first measured during a Nov. 2005 cruise on board Dayang Yihao (InterRidge News, vol. 15, pp. 33-34, 2006). Color video footages of the seafloor in the vent-field area were first obtained by a deep-towed video camera in February 2007 during DY115-19 Leg 1, when significant water column turbidity anomalies, noticeable temperature anomalies and methane anomalies were also measured. The vent field was then precisely located, mapped, and photographed in great detail in February- March 2007 during the DY115-19 Leg 2, using the autonomous underwater vehicle ABE of the Woods Hole Oceanographic Institution. A high-resolution bathymetric map, more than 5,000 near-bottom color photos, and several types of water column data were all obtained during three phases of ABE dives. Within the approximately 120-m-long by 100-m-wide hydrothermal field, three groups of active high-temperature vents were identified and color images of black smokers and associated biological communities were obtained from ABE, flying 5 m above the seafloor. Hydrothermal sulfide deposits were then successfully obtained using a TV-guided grab.

  17. 40 CFR 63.1413 - Compliance demonstration procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... liquids, other than fuels, received by the control device. (i) For a scrubber, the design evaluation shall... scrubbing liquid. The design evaluation shall establish the design exhaust vent stream organic compound... process vent and the overall percent reduction for the collection of non-reactor batch process vents...

  18. 40 CFR 63.2465 - What requirements must I meet for process vents that emit hydrogen halide and halogen HAP or HAP...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... process vents that emit hydrogen halide and halogen HAP or HAP metals? 63.2465 Section 63.2465 Protection... hydrogen halide and halogen HAP or HAP metals? (a) You must meet each emission limit in Table 3 to this...) of this section. (b) If any process vents within a process emit hydrogen halide and halogen HAP, you...

  19. 40 CFR 63.2465 - What requirements must I meet for process vents that emit hydrogen halide and halogen HAP or HAP...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... process vents that emit hydrogen halide and halogen HAP or HAP metals? 63.2465 Section 63.2465 Protection... hydrogen halide and halogen HAP or HAP metals? (a) You must meet each emission limit in Table 3 to this...) of this section. (b) If any process vents within a process emit hydrogen halide and halogen HAP, you...

  20. 40 CFR 63.2465 - What requirements must I meet for process vents that emit hydrogen halide and halogen HAP or HAP...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... process vents that emit hydrogen halide and halogen HAP or HAP metals? 63.2465 Section 63.2465 Protection... hydrogen halide and halogen HAP or HAP metals? (a) You must meet each emission limit in Table 3 to this...) of this section. (b) If any process vents within a process emit hydrogen halide and halogen HAP, you...

  1. 46 CFR 92.15-10 - Ventilation for closed spaces.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Ventilation for closed spaces. 92.15-10 Section 92.15-10... CONSTRUCTION AND ARRANGEMENT Ventilation § 92.15-10 Ventilation for closed spaces. (a) Except as noted in paragraph (c) of this section, all enclosed spaces within the vessel shall be properly vented or ventilated...

  2. 46 CFR 92.15-10 - Ventilation for closed spaces.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Ventilation for closed spaces. 92.15-10 Section 92.15-10... CONSTRUCTION AND ARRANGEMENT Ventilation § 92.15-10 Ventilation for closed spaces. (a) Except as noted in paragraph (c) of this section, all enclosed spaces within the vessel shall be properly vented or ventilated...

  3. 46 CFR 92.15-10 - Ventilation for closed spaces.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Ventilation for closed spaces. 92.15-10 Section 92.15-10... CONSTRUCTION AND ARRANGEMENT Ventilation § 92.15-10 Ventilation for closed spaces. (a) Except as noted in paragraph (c) of this section, all enclosed spaces within the vessel shall be properly vented or ventilated...

  4. 46 CFR 92.15-10 - Ventilation for closed spaces.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Ventilation for closed spaces. 92.15-10 Section 92.15-10... CONSTRUCTION AND ARRANGEMENT Ventilation § 92.15-10 Ventilation for closed spaces. (a) Except as noted in paragraph (c) of this section, all enclosed spaces within the vessel shall be properly vented or ventilated...

  5. 46 CFR 92.15-10 - Ventilation for closed spaces.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Ventilation for closed spaces. 92.15-10 Section 92.15-10... CONSTRUCTION AND ARRANGEMENT Ventilation § 92.15-10 Ventilation for closed spaces. (a) Except as noted in paragraph (c) of this section, all enclosed spaces within the vessel shall be properly vented or ventilated...

  6. 46 CFR 36.20-5 - Ventilation of pumproom-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Ventilation of pumproom-TB/ALL. 36.20-5 Section 36.20-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS ELEVATED TEMPERATURE CARGOES Vents and Ventilation § 36.20-5 Ventilation of pumproom—TB/ALL. (a) Where personnel are required to enter pumprooms...

  7. 40 CFR 63.115 - Process vent provisions-methods and procedures for process vent group determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 2 process vent definition of this subpart shall measure either total organic HAP or TOC... either TOC (minus methane and ethane) or organic HAP shall be calculated according to paragraph (c)(3)(ii)(A) or (c)(3)(ii)(B) of this section as applicable. (A) The TOC concentration (CTOC) is the sum of...

  8. Volcanism and the atmosphere: the potential role of the atmosphere in unlocking the reactivity of volcanic emissions.

    PubMed

    Mather, Tamsin A

    2008-12-28

    Recent measurements of reactive trace gas species in volcanic plumes have offered intriguing hints at the chemistry occurring in the hot environment at volcanic vents. This has led to the recognition that volcanic vents should be regarded not only as passive sources of volcanic gases to the atmosphere, but also as 'reaction vessels' that unlock otherwise inert volcanic and atmospheric gas species. The atypical conditions created by the mixing of ambient atmosphere with the hot gases emitted from magma give rise to elevated concentrations of otherwise unexpected chemical compounds. Rapid cooling of this mixture allows these species to persist into the environment, with important consequences for gas plume chemistry and impacts. This paper discusses some examples of the implications of these high-temperature interactions in terms of nitrogen, halogen and sulphur chemistry, and their consequences in terms of the global fixed nitrogen budget, volcanically induced ozone destruction and particle fluxes to the atmosphere. Volcanically initiated atmospheric chemistry was likely to have been particularly important before biological (and latterly anthropogenic) processes started to dominate many geochemical cycles, with important consequences in terms of the evolution of the nitrogen cycle and the role of particles in modulating the Earth's climate.

  9. Thermal insulating barrier and neutron shield providing integrated protection for a nuclear reactor vessel

    DOEpatents

    Schreiber, R.B.; Fero, A.H.; Sejvar, J.

    1997-12-16

    The reactor vessel of a nuclear reactor installation which is suspended from the cold leg nozzles in a reactor cavity is provided with a lower thermal insulating barrier spaced from the reactor vessel to form a chamber which can be flooded with cooling water through passive valving to directly cool the reactor vessel in the event of a severe accident. The passive valving also includes bistable vents at the upper end of the thermal insulating barrier for releasing steam. A removable, modular neutron shield extending around the upper end of the reactor cavity below the nozzles forms with the upwardly and outwardly tapered transition on the outer surface of the reactor vessel, a labyrinthine channel which reduces neutron streaming while providing a passage for the escape of steam during a severe accident, and for the cooling air which is circulated along the reactor cavity walls outside the thermal insulating barrier during normal operation of the reactor. 8 figs.

  10. Thermal insulating barrier and neutron shield providing integrated protection for a nuclear reactor vessel

    DOEpatents

    Schreiber, Roger B.; Fero, Arnold H.; Sejvar, James

    1997-01-01

    The reactor vessel of a nuclear reactor installation which is suspended from the cold leg nozzles in a reactor cavity is provided with a lower thermal insulating barrier spaced from the reactor vessel to form a chamber which can be flooded with cooling water through passive valving to directly cool the reactor vessel in the event of a severe accident. The passive valving also includes bistable vents at the upper end of the thermal insulating barrier for releasing steam. A removable, modular neutron shield extending around the upper end of the reactor cavity below the nozzles forms with the upwardly and outwardly tapered transition on the outer surface of the reactor vessel, a labyrinthine channel which reduces neutron streaming while providing a passage for the escape of steam during a severe accident, and for the cooling air which is circulated along the reactor cavity walls outside the thermal insulating barrier during normal operation of the reactor.

  11. 40 CFR Table 1 to Subpart Ffff of... - Emission Limits and Work Practice Standards for Continuous Process Vents

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Pollutants: Miscellaneous Organic Chemical Manufacturing Pt. 63, Subpt. FFFF, Table 1 Table 1 to Subpart FFFF... continuous process vent a. Not applicable i. Reduce emissions of total organic HAP by ≥98 percent by weight or to an outlet process concentration ≤20 ppmv as organic HAP or TOC by venting emissions through a...

  12. 40 CFR 60.562-1 - Standards: Process emissions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Compound (VOC) Emissions from the Polymer Manufacturing Industry § 60.562-1 Standards: Process emissions... vent stream from a control device shall have car-sealed opened all valves in the vent system from the emission source to the control device and car-sealed closed all valves in vent system that would lead the...

  13. 40 CFR 63.11935 - What CEMS and CPMS requirements must I meet to demonstrate initial and continuous compliance with...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... process vents in Table 1 or 2 to this subpart. You must meet the CPMS requirements in paragraph (c) of... parameter specified in Table 5 to this subpart for each process vent control device specified in § 63.11925(b) that is used to comply with the emission limits for process vents in Table 1 or 2 to this subpart...

  14. 40 CFR 63.11935 - What CEMS and CPMS requirements must I meet to demonstrate initial and continuous compliance with...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... process vents in Table 1 or 2 to this subpart. You must meet the CPMS requirements in paragraph (c) of... parameter specified in Table 5 to this subpart for each process vent control device specified in § 63.11925(b) that is used to comply with the emission limits for process vents in Table 1 or 2 to this subpart...

  15. 40 CFR 63.11935 - What CEMS and CPMS requirements must I meet to demonstrate initial and continuous compliance with...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... process vents in Table 1 or 2 to this subpart. You must meet the CPMS requirements in paragraph (c) of... parameter specified in Table 5 to this subpart for each process vent control device specified in § 63.11925(b) that is used to comply with the emission limits for process vents in Table 1 or 2 to this subpart...

  16. 40 CFR 60.5411 - What additional requirements must I meet to determine initial compliance for my covers and closed...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What additional requirements must I meet to determine initial compliance for my covers and closed vent systems routing materials from storage vessels and centrifugal compressor wet seal degassing systems? 60.5411 Section 60.5411 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY ...

  17. 50 CFR 697.21 - Gear identification and marking, escape vent, maximum trap size, and ghost panel requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and marking. All lobster gear deployed or possessed in the EEZ, or, deployed or possessed by a person on or from a vessel issued a Federal limited access American lobster permit, and not permanently.... Effective through April 30, 2000, all lobster gear must be marked with the following code of identification...

  18. 50 CFR 697.21 - Gear identification and marking, escape vent, maximum trap size, and ghost panel requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and marking. All lobster gear deployed or possessed in the EEZ, or, deployed or possessed by a person on or from a vessel issued a Federal limited access American lobster permit, and not permanently.... Effective through April 30, 2000, all lobster gear must be marked with the following code of identification...

  19. 46 CFR 32.60-40 - Construction and testing of cargo tanks and bulkheads-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... cargo tanks vented at gage pressure of 4 pounds per square inch or less shall be constructed and tested... 4 pounds per square inch but not exceeding 10 pounds per square inch gage pressure will be given... square inch are considered to be pressure vessels and shall be of cylindrical or similar design and shall...

  20. 46 CFR 32.60-40 - Construction and testing of cargo tanks and bulkheads-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... cargo tanks vented at gage pressure of 4 pounds per square inch or less shall be constructed and tested... 4 pounds per square inch but not exceeding 10 pounds per square inch gage pressure will be given... square inch are considered to be pressure vessels and shall be of cylindrical or similar design and shall...

  1. 46 CFR 32.60-40 - Construction and testing of cargo tanks and bulkheads-TB/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... cargo tanks vented at gage pressure of 4 pounds per square inch or less shall be constructed and tested... 4 pounds per square inch but not exceeding 10 pounds per square inch gage pressure will be given... square inch are considered to be pressure vessels and shall be of cylindrical or similar design and shall...

  2. 46 CFR 32.60-40 - Construction and testing of cargo tanks and bulkheads-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... cargo tanks vented at gage pressure of 4 pounds per square inch or less shall be constructed and tested... 4 pounds per square inch but not exceeding 10 pounds per square inch gage pressure will be given... square inch are considered to be pressure vessels and shall be of cylindrical or similar design and shall...

  3. 46 CFR 32.60-40 - Construction and testing of cargo tanks and bulkheads-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... cargo tanks vented at gage pressure of 4 pounds per square inch or less shall be constructed and tested... 4 pounds per square inch but not exceeding 10 pounds per square inch gage pressure will be given... square inch are considered to be pressure vessels and shall be of cylindrical or similar design and shall...

  4. Development of heat transfer enhancement techniques for external cooling of an advanced reactor vessel

    NASA Astrophysics Data System (ADS)

    Yang, Jun

    Nucleate boiling is a well-recognized means for passively removing high heat loads (up to ˜106 W/m2) generated by a molten reactor core under severe accident conditions while maintaining relatively low reactor vessel temperature (<800 °C). With the upgrade and development of advanced power reactors, however, enhancing the nucleate boiling rate and its upper limit, Critical Heat Flux (CHF), becomes the key to the success of external passive cooling of reactor vessel undergoing core disrupture accidents. In the present study, two boiling heat transfer enhancement methods have been proposed, experimentally investigated and theoretically modelled. The first method involves the use of a suitable surface coating to enhance downward-facing boiling rate and CHF limit so as to substantially increase the possibility of reactor vessel surviving high thermal load attack. The second method involves the use of an enhanced vessel/insulation design to facilitate the process of steam venting through the annular channel formed between the reactor vessel and the insulation structure, which in turn would further enhance both the boiling rate and CHF limit. Among the various available surface coating techniques, metallic micro-porous layer surface coating has been identified as an appropriate coating material for use in External Reactor Vessel Cooling (ERVC) based on the overall consideration of enhanced performance, durability, the ease of manufacturing and application. Since no previous research work had explored the feasibility of applying such a metallic micro-porous layer surface coating on a large, downward facing and curved surface such as the bottom head of a reactor vessel, a series of characterization tests and experiments were performed in the present study to determine a suitable coating material composition and application method. Using the optimized metallic micro-porous surface coatings, quenching and steady-state boiling experiments were conducted in the Sub-scale Boundary Layer Boiling (SBLB) test facility at Penn State to investigate the nucleate boiling and CHF enhancement effects of the surface coatings by comparing the measurements with those for a plain vessel without coatings. An overall enhancement in nucleate boiling rates and CHF limits up to 100% were observed. Moreover, combination of data from quenching experiments and steady-state experiments produced new sets of boiling curves, which covered both the nucleate and transient boiling regimes with much greater accuracy. Beside the experimental work, a theoretical CHF model has also been developed by considering the vapor dynamics and the boiling-induced two-phase motions in three separate regions adjacent to the heating surface. The CHF model is capable of predicting the performance of micro-porous coatings with given particle diameter, porosity, media permeability and thickness. It is found that the present CHF model agrees favorably with the experimental data. Effects of an enhanced vessel/insulation structure on the local nucleate boiling rate and CHF limit have also been investigated experimentally. It is observed that the local two-phase flow quantities such as the local void fraction, quality, mean vapor velocity, mean liquid velocity, and mean vapor and liquid mass flow rates could have great impact on the local surface heat flux as boiling of water takes place on the vessel surface. An upward co-current two-phase flow model has been developed to predict the local two-phase flow behavior for different flow channel geometries, which are set by the design of insulation structures. It is found from the two-phase flow visualization experiments and the two-phase flow model calculations that the enhanced vessel/insulation structure greatly improved the steam venting process at the minimum gap location compared to the performance of thermal insulation structures without enhancement. Moveover, depending on the angular location, steady-state boiling experiments with the enhanced insulation design showed an enhancement of 1.8 to 3.0 times in the local critical heat flux. Finally, nucleate boiling and CHF correlations were developed based on the data obtained from various quenching and steady-state boiling experiments. Additionally, CHF enhancement factors were determined and examined to show the separate and integral effects of the two ERVC enhancement methods. When both vessel coating and insulation structure were used simultaneously, the integral effect on CHF enhancement was found much less than the product of the two separate effects, indicating possible competing mechanisms (i.e., interference) between the two enhancement methods.

  5. Flashback flame arrester devices for fuel cargo tank vapor vents

    NASA Technical Reports Server (NTRS)

    Bjorklund, R. A.; Kushida, R. O.

    1981-01-01

    The flame quenching capability of four types of flame arresting devices suitable for installation on fuel cargo tank vents of marine transport vessels is evaluated. A single 30 mesh screen, a dual 20 mesh screen, a spiral wound crimped metal ribbon, and a packed bed of ballast rings were tested. Flame speed and flame penetration of the test arresters were determined. Eight fuels representative of bulk cargoes were tested. The test arresters quenched a minimum of three flashback flames from all eight fuels, with one exception: high speed ethylene flames penetrated the dual 20 mesh screen on three tests. The arresters withstood the sustained flame from a propane/air mixture for 30 minutes. None of the arresters withstood the sustained flame from an ethylene/air mixture for more than 7 minutes.

  6. 40 CFR Table 19 to Subpart G of... - Wastewater-Information on Residuals To Be Submitted With Notification of Compliance Status a b

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 10 2014-07-01 2014-07-01 false Wastewater-Information on Residuals To... Vents, Storage Vessels, Transfer Operations, and Wastewater Pt. 63, Subpt. G, Table 19 Table 19 to Subpart G of Part 63—Wastewater—Information on Residuals To Be Submitted With Notification of Compliance...

  7. 40 CFR Table 19 to Subpart G of... - Wastewater-Information on Residuals To Be Submitted With Notification of Compliance Status a,b

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Wastewater-Information on Residuals To... Vents, Storage Vessels, Transfer Operations, and Wastewater Pt. 63, Subpt. G, Table 19 Table 19 to Subpart G of Part 63—Wastewater—Information on Residuals To Be Submitted With Notification of Compliance...

  8. 40 CFR Table 19 to Subpart G of... - Wastewater-Information on Residuals To Be Submitted With Notification of Compliance Status a,b

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 10 2012-07-01 2012-07-01 false Wastewater-Information on Residuals To... Vents, Storage Vessels, Transfer Operations, and Wastewater Pt. 63, Subpt. G, Table 19 Table 19 to Subpart G of Part 63—Wastewater—Information on Residuals To Be Submitted With Notification of Compliance...

  9. 40 CFR Table 19 to Subpart G of... - Wastewater-Information on Residuals To Be Submitted With Notification of Compliance Status a,b

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Wastewater-Information on Residuals To... Vents, Storage Vessels, Transfer Operations, and Wastewater Pt. 63, Subpt. G, Table 19 Table 19 to Subpart G of Part 63—Wastewater—Information on Residuals To Be Submitted With Notification of Compliance...

  10. 40 CFR Table 19 to Subpart G of... - Wastewater-Information on Residuals To Be Submitted With Notification of Compliance Status a,b

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Wastewater-Information on Residuals To... Vents, Storage Vessels, Transfer Operations, and Wastewater Pt. 63, Subpt. G, Table 19 Table 19 to Subpart G of Part 63—Wastewater—Information on Residuals To Be Submitted With Notification of Compliance...

  11. Analysis of a nuclear accident: fission and activation product releases from the Fukushima Daiichi nuclear facility as remote indicators of source identification, extent of release, and state of damaged spent nuclear fuel.

    PubMed

    Schwantes, Jon M; Orton, Christopher R; Clark, Richard A

    2012-08-21

    Researchers evaluated radionuclide measurements of environmental samples taken from the Fukushima Daiichi nuclear facility and reported on the Tokyo Electric Power Co. Website following the 2011 tsunami-initiated catastrophe. This effort identified Units 1 and 3 as the major source of radioactive contamination to the surface soil near the facility. Radionuclide trends identified in the soils suggested that: (1) chemical volatility driven by temperature and reduction potential within the vented reactors' primary containment vessels dictated the extent of release of radiation; (2) all coolant had likely evaporated by the time of venting; and (3) physical migration through the fuel matrix and across the cladding wall were minimally effective at containing volatile species, suggesting damage to fuel bundles was extensive. Plutonium isotopic ratios and their distance from the source indicated that the damaged reactors were the major contributor of plutonium to surface soil at the source, decreasing rapidly with distance from the facility. Two independent evaluations estimated the fraction of the total plutonium inventory released to the environment relative to cesium from venting Units 1 and 3 to be ∼0.002-0.004%. This study suggests significant volatile radionuclides within the spent fuel at the time of venting, but not as yet observed and reported within environmental samples, as potential analytes of concern for future environmental surveys around the site. The majority of the reactor inventories of isotopes of less volatile elements like Pu, Nb, and Sr were likely contained within the damaged reactors during venting.

  12. 40 CFR 265.1032 - Standards: Process vents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... owner or operator of a fa-cil-ity with process vents associated with distillation, fractionation, thin-film evaporation, solvent extraction or -air or steam stripping operations man-aging haz-ard-ous wastes...

  13. 40 CFR 265.1032 - Standards: Process vents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... owner or operator of a fa-cil-ity with process vents associated with distillation, fractionation, thin-film evaporation, solvent extraction or -air or steam stripping operations man-aging haz-ard-ous wastes...

  14. Heat dissipating nuclear reactor

    DOEpatents

    Hunsbedt, A.; Lazarus, J.D.

    1985-11-21

    Disclosed is a nuclear reactor containment adapted to retain and cool core debris in the unlikely event of a core meltdown and subsequent breach in the reactor vessel. The reactor vessel is seated in a cavity which has a thick metal sidewall that is integral with a thick metal basemat at the bottom of the cavity. The basemat extends beyond the perimeter of the cavity sidewall. Underneath the basemat is a porous bed with water pipes and steam pipes running into it. Water is introduced into the bed and converted into steam which is vented to the atmosphere. A plurality of metal pilings in the form of H-beams extend from the metal base plate downwardly and outwardly into the earth.

  15. Heat dissipating nuclear reactor

    DOEpatents

    Hunsbedt, Anstein; Lazarus, Jonathan D.

    1987-01-01

    Disclosed is a nuclear reactor containment adapted to retain and cool core debris in the unlikely event of a core meltdown and subsequent breach in the reactor vessel. The reactor vessel is seated in a cavity which has a thick metal sidewall that is integral with a thick metal basemat at the bottom of the cavity. The basemat extends beyond the perimeter of the cavity sidewall. Underneath the basemat is a porous bed with water pipes and steam pipes running into it. Water is introduced into the bed and converted into steam which is vented to the atmosphere. A plurality of metal pilings in the form of H-beams extends from the metal base plate downwardly and outwardly into the earth.

  16. 40 CFR 63.7885 - What are the general standards I must meet for my affected process vents?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Remediation General Standards § 63.7885 What are the general standards I must meet for my affected process...) You determine for the remediation material treated or managed by the process vented through the...

  17. 46 CFR 32.55-30 - Venting of cargo tanks of tank vessels constructed between November 10, 1936, and July 1, 1951-TB...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... carrying Grade A liquids, separate discharge pipes may be fitted to each pressure-vacuum relief valve, or... which Grade B or C liquids are to be transported shall be fitted with individual pressure-vacuum relief... arrester or a pressure-vacuum relief valve. (d) Grade D or E liquids. Cargo tanks in which Grade D or E...

  18. 46 CFR 32.55-30 - Venting of cargo tanks of tank vessels constructed between November 10, 1936, and July 1, 1951-TB...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... carrying Grade A liquids, separate discharge pipes may be fitted to each pressure-vacuum relief valve, or... which Grade B or C liquids are to be transported shall be fitted with individual pressure-vacuum relief... arrester or a pressure-vacuum relief valve. (d) Grade D or E liquids. Cargo tanks in which Grade D or E...

  19. 46 CFR 32.55-30 - Venting of cargo tanks of tank vessels constructed between November 10, 1936, and July 1, 1951-TB...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... carrying Grade A liquids, separate discharge pipes may be fitted to each pressure-vacuum relief valve, or... which Grade B or C liquids are to be transported shall be fitted with individual pressure-vacuum relief... arrester or a pressure-vacuum relief valve. (d) Grade D or E liquids. Cargo tanks in which Grade D or E...

  20. 46 CFR 32.55-30 - Venting of cargo tanks of tank vessels constructed between November 10, 1936, and July 1, 1951-TB...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... carrying Grade A liquids, separate discharge pipes may be fitted to each pressure-vacuum relief valve, or... which Grade B or C liquids are to be transported shall be fitted with individual pressure-vacuum relief... arrester or a pressure-vacuum relief valve. (d) Grade D or E liquids. Cargo tanks in which Grade D or E...

  1. 46 CFR 32.55-30 - Venting of cargo tanks of tank vessels constructed between November 10, 1936, and July 1, 1951-TB...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... carrying Grade A liquids, separate discharge pipes may be fitted to each pressure-vacuum relief valve, or... which Grade B or C liquids are to be transported shall be fitted with individual pressure-vacuum relief... arrester or a pressure-vacuum relief valve. (d) Grade D or E liquids. Cargo tanks in which Grade D or E...

  2. Development of High Temperature (3400F) and High Pressure (27,000 PSI) Gas Venting Process for Nitrogen Batch Heater

    DTIC Science & Technology

    2018-01-01

    for Mach 14 possibly degrading seals ability to contain pressure due to exposure to high temperatures. A different solution for Mach 14 case will be...AEDC-TR-18-H-1 Development of High Temperature (3400°F) and High Pressure (27,000 PSI) Gas Venting Process for Nitrogen Batch...Development of High Temperature (3400°F) and High Pressure (27,000 PSI) Gas Venting Process for Nitrogen Batch Heater FA9101-10-D-0001-0010 5b. GRANT

  3. Performance analysis of no-vent fill process for liquid hydrogen tank in terrestrial and on-orbit environments

    NASA Astrophysics Data System (ADS)

    Wang, Lei; Li, Yanzhong; Zhang, Feini; Ma, Yuan

    2015-12-01

    Two finite difference computer models, aiming at the process predictions of no-vent fill in normal gravity and microgravity environments respectively, are developed to investigate the filling performance in a liquid hydrogen (LH2) tank. In the normal gravity case model, the tank/fluid system is divided into five control volume including ullage, bulk liquid, gas-liquid interface, ullage-adjacent wall, and liquid-adjacent wall. In the microgravity case model, vapor-liquid thermal equilibrium state is maintained throughout the process, and only two nodes representing fluid and wall regions are applied. To capture the liquid-wall heat transfer accurately, a series of heat transfer mechanisms are considered and modeled successively, including film boiling, transition boiling, nucleate boiling and liquid natural convection. The two models are validated by comparing their prediction with experimental data, which shows good agreement. Then the two models are used to investigate the performance of no-vent fill in different conditions and several conclusions are obtained. It shows that in the normal gravity environment the no-vent fill experiences a continuous pressure rise during the whole process and the maximum pressure occurs at the end of the operation, while the maximum pressure of the microgravity case occurs at the beginning stage of the process. Moreover, it seems that increasing inlet mass flux has an apparent influence on the pressure evolution of no-vent fill process in normal gravity but a little influence in microgravity. The larger initial wall temperature brings about more significant liquid evaporation during the filling operation, and then causes higher pressure evolution, no matter the filling process occurs under normal gravity or microgravity conditions. Reducing inlet liquid temperature can improve the filling performance in normal gravity, but cannot significantly reduce the maximum pressure in microgravity. The presented work benefits the understanding of the no-vent fill performance and may guide the design of on-orbit no-vent fill system.

  4. 40 CFR 63.7890 - What emissions limitations and work practice standards must I meet for process vents?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Process Vents § 63.7890 What emissions limitations and work practice standards...

  5. 40 CFR 63.7890 - What emissions limitations and work practice standards must I meet for process vents?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Process Vents § 63.7890 What emissions limitations and work practice standards...

  6. 40 CFR 63.7890 - What emissions limitations and work practice standards must I meet for process vents?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Process Vents § 63.7890 What emissions limitations and work practice standards...

  7. 40 CFR 63.7890 - What emissions limitations and work practice standards must I meet for process vents?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Process Vents § 63.7890 What emissions limitations and work practice standards...

  8. 40 CFR 63.1326 - Batch process vents-recordkeeping provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins § 63.1326 Batch process vents—recordkeeping provisions. (a) Group determination records for batch... this section for each batch process vent subject to the group determination procedures of § 63.1323...

  9. 40 CFR 63.107 - Identification of process vents subject to this subpart.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CATEGORIES National Emission Standards for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry § 63.107 Identification of process vents subject to this subpart. (a) The..., distillation unit, or reactor during operation of the chemical manufacturing process unit. (c) The discharge to...

  10. 40 CFR 63.107 - Identification of process vents subject to this subpart.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CATEGORIES National Emission Standards for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry § 63.107 Identification of process vents subject to this subpart. (a) The..., distillation unit, or reactor during operation of the chemical manufacturing process unit. (c) The discharge to...

  11. 40 CFR 63.107 - Identification of process vents subject to this subpart.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CATEGORIES National Emission Standards for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry § 63.107 Identification of process vents subject to this subpart. (a) The..., distillation unit, or reactor during operation of the chemical manufacturing process unit. (c) The discharge to...

  12. 40 CFR 63.491 - Batch front-end process vents-recordkeeping requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CATEGORIES National Emission Standards for Hazardous Air Pollutant Emissions: Group I Polymers and Resins § 63.491 Batch front-end process vents—recordkeeping requirements. (a) Group determination records for...) through (a)(6) of this section for each batch front-end process vent subject to the group determination...

  13. 40 CFR 63.487 - Batch front-end process vents-reference control technology.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control technology. 63.487 Section 63.487 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... CATEGORIES National Emission Standards for Hazardous Air Pollutant Emissions: Group I Polymers and Resins § 63.487 Batch front-end process vents—reference control technology. (a) Batch front-end process vents...

  14. 40 CFR 63.491 - Batch front-end process vents-recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CATEGORIES National Emission Standards for Hazardous Air Pollutant Emissions: Group I Polymers and Resins § 63.491 Batch front-end process vents—recordkeeping requirements. (a) Group determination records for...) through (a)(6) of this section for each batch front-end process vent subject to the group determination...

  15. 40 CFR 63.491 - Batch front-end process vents-recordkeeping requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CATEGORIES National Emission Standards for Hazardous Air Pollutant Emissions: Group I Polymers and Resins § 63.491 Batch front-end process vents—recordkeeping requirements. (a) Group determination records for...) through (a)(6) of this section for each batch front-end process vent subject to the group determination...

  16. 40 CFR 63.491 - Batch front-end process vents-recordkeeping requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CATEGORIES National Emission Standards for Hazardous Air Pollutant Emissions: Group I Polymers and Resins § 63.491 Batch front-end process vents—recordkeeping requirements. (a) Group determination records for...) through (a)(6) of this section for each batch front-end process vent subject to the group determination...

  17. 40 CFR 65.85 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... permit limit applicable to the process vent. (4) Design analysis based on accepted chemical engineering principles, measurable process parameters, or physical or chemical laws or properties. (5) All data... tested for vapor tightness. (b) Engineering assessment. Engineering assessment to determine if a vent...

  18. 40 CFR 65.85 - Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... permit limit applicable to the process vent. (4) Design analysis based on accepted chemical engineering principles, measurable process parameters, or physical or chemical laws or properties. (5) All data... tested for vapor tightness. (b) Engineering assessment. Engineering assessment to determine if a vent...

  19. 40 CFR 65.85 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... permit limit applicable to the process vent. (4) Design analysis based on accepted chemical engineering principles, measurable process parameters, or physical or chemical laws or properties. (5) All data... tested for vapor tightness. (b) Engineering assessment. Engineering assessment to determine if a vent...

  20. 40 CFR 65.85 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... permit limit applicable to the process vent. (4) Design analysis based on accepted chemical engineering principles, measurable process parameters, or physical or chemical laws or properties. (5) All data... tested for vapor tightness. (b) Engineering assessment. Engineering assessment to determine if a vent...

  1. 40 CFR 65.85 - Procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... permit limit applicable to the process vent. (4) Design analysis based on accepted chemical engineering principles, measurable process parameters, or physical or chemical laws or properties. (5) All data... tested for vapor tightness. (b) Engineering assessment. Engineering assessment to determine if a vent...

  2. Using Volcanic Lightning Measurements to Discern Variations in Explosive Volcanic Activity

    NASA Astrophysics Data System (ADS)

    Behnke, S. A.; Thomas, R. J.; McNutt, S. R.; Edens, H. E.; Krehbiel, P. R.; Rison, W.

    2013-12-01

    VHF observations of volcanic lightning have been made during the recent eruptions of Augustine Volcano (2006, Alaska, USA), Redoubt Volcano (2009, Alaska, USA), and Eyjafjallajökull (2010, Iceland). These show that electrical activity occurs both on small scales at the vent of the volcano, concurrent with an eruptive event and on large scales throughout the eruption column during and subsequent to an eruptive event. The small-scale discharges at the vent of the volcano are often referred to as 'vent discharges' and are on the order of 10-100 meters in length and occur at rates on the order of 1000 per second. The high rate of vent discharges produces a distinct VHF signature that is sometimes referred to as 'continuous RF' radiation. VHF radiation from vent discharges has been observed at sensors placed as far as 100 km from the volcano. VHF and infrasound measurements have shown that vent discharges occur simultaneously with the onset of eruption, making their detection an unambiguous indicator of explosive volcanic activity. The fact that vent discharges are observed concurrent with explosive volcanic activity indicates that volcanic ejecta are charged upon eruption. VHF observations have shown that the intensity of vent discharges varies between eruptive events, suggesting that fluctuations in eruptive processes affect the electrification processes giving rise to vent discharges. These fluctuations may be variations in eruptive vigor or variations in the type of eruption; however, the data obtained so far do not show a clear relationship between eruption parameters and the intensity or occurrence of vent discharges. Further study is needed to clarify the link between vent discharges and eruptive behavior, such as more detailed lightning observations concurrent with tephra measurements and other measures of eruptive strength. Observations of vent discharges, and volcanic lightning observations in general, are a valuable tool for volcano monitoring, providing a method for rapid detection of volcanic activity in real-time.

  3. Living with the Heat. Submarine Ring of Fire--Grades 5-6. Hydrothermal Vent Ecology.

    ERIC Educational Resources Information Center

    National Oceanic and Atmospheric Administration (DOC), Rockville, MD.

    This activity is designed to teach about hydrothermal vent ecology. Students are expected to describe how hydrothermal vents are formed and characterize the physical conditions at these sites, explain chemosynthesis and contrast this process with photosynthesis, identify autotrophic bacteria as the basis for food webs in hydrothermal vent…

  4. 40 CFR 63.1260 - Reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... process vents as required in § 63.1257(d)(2)(ii). (6) Data and other information supporting the determination of annual average concentrations by process simulation as required in § 63.1257(e)(1)(ii). (7... must be performed while a process with a vent subject to § 63.1254(a)(3) will be operating. (g...

  5. Using Image Analysis to Explore Changes In Bacterial Mat Coverage at the Base of a Hydrothermal Vent within the Caldera of Axial Seamount

    NASA Astrophysics Data System (ADS)

    Knuth, F.; Crone, T. J.; Marburg, A.

    2017-12-01

    The Ocean Observatories Initiative's (OOI) Cabled Array is delivering real-time high-definition video data from an HD video camera (CAMHD), installed at the Mushroom hydrothermal vent in the ASHES hydrothermal vent field within the caldera of Axial Seamount, an active submarine volcano located approximately 450 kilometers off the coast of Washington at a depth of 1,542 m. Every three hours the camera pans, zooms and focuses in on nine distinct scenes of scientific interest across the vent, producing 14-minute-long videos during each run. This standardized video sampling routine enables scientists to programmatically analyze the content of the video using automated image analysis techniques. Each scene-specific time series dataset can service a wide range of scientific investigations, including the estimation of bacterial flux into the system by quantifying chemosynthetic bacterial clusters (floc) present in the water column, relating periodicity in hydrothermal vent fluid flow to earth tides, measuring vent chimney growth in response to changing hydrothermal fluid flow rates, or mapping the patterns of fauna colonization, distribution and composition across the vent over time. We are currently investigating the seventh scene in the sampling routine, focused on the bacterial mat covering the seafloor at the base of the vent. We quantify the change in bacterial mat coverage over time using image analysis techniques, and examine the relationship between mat coverage, fluid flow processes, episodic chimney collapse events, and other processes observed by Cabled Array instrumentation. This analysis is being conducted using cloud-enabled computer vision processing techniques, programmatic image analysis, and time-lapse video data collected over the course of the first CAMHD deployment, from November 2015 to July 2016.

  6. 40 CFR 63.7893 - How do I demonstrate continuous compliance with the emissions limitations and work practice...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...(b)(2), you maintain emissions of TOC (minus methane and ethane) from all affected process vents at...), you maintain that the emissions of TOC (minus methane and ethane) from all affected process vents are...

  7. Low Gravity venting of Refrigerant 11

    NASA Technical Reports Server (NTRS)

    Labus, T. L.; Aydelott, J. C.; Lacovic, R. F.

    1972-01-01

    An experimental investigation was conducted in a five-second zero gravity facility to examine the effects of venting initially saturated Refrigerant 11 from a cylindrical container (15-cm diameter) under reduced gravitational conditions. The system Bond numbers studied were 0 (weightlessness), 9 and 63; the liquid exhibited a nearly zero-degree contact angle on the container surface. During the venting process, both liquid-vapor interface and liquid bulk vaporization occurred. The temperature of the liquid in the immediate vicinity of the liquid-vapor interface was found to decrease during venting, while the liquid bulk temperature remained constant. Qualitative observations of the effects of system acceleration, vent rate, and vapor volume presented. Quantitative information concerning the ullage pressure decay during low gravity venting is also included.

  8. New marine community

    NASA Astrophysics Data System (ADS)

    While exploring the West Florida Escarpment, a steep slope in the Gulf of Mexico several hundred kilometers off the Florida coast, the deep submergence research vessel Alvin chanced upon a well-developed community of marine life akin to that found 7 years ago in the eastern Pacific Ocean.According to the Woods Hole Oceanographic Institution, which operates the submersible and its new tender, the Atlantis II (Eos, November 1, 1983, p. 619), the marine community contains large clams, mussels, crabs, fish, and tube worms like those found at hydrothermal vents in the eastern Pacific. While the east Pacific communities exist at spreading centers, the newly discovered group, which may stretch for almost 2 km at a depth of roughly 3200 km, lies in a passive continental margin. Also, whereas the water around the Pacific hydrothermal vents is much warmer than the surrounding seawater, the water around the new found community is apparently the same temperature as the ambient waters.

  9. Informing hazardous zones for on-board maritime hydrogen liquid and gas systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blaylock, Myra L.; Pratt, Joseph William; Bran Anleu, Gabriela A.

    The significantly higher buoyancy of hydrogen compared to natural gas means that hazardous zones defined in the IGF code may be inaccurate if applied to hydrogen. This could place undue burden on ship design or could lead to situations that are unknowingly unsafe. We present dispersion analyses to examine three vessel case studies: (1) abnormal external vents of full blowdown of a liquid hydrogen tank due to a failed relief device in still air and with crosswind; (2) vents due to naturally-occurring boil-off of liquid within the tank; and (3) a leak from the pipes leading into the fuel cellmore » room. The size of the hydrogen plumes resulting from a blowdown of the tank depend greatly on the wind conditions. It was also found that for normal operations releasing a small amount of "boil- off" gas to regulate the pressure in the tank does not create flammable concentrations.« less

  10. 40 CFR 63.441 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... or live steam. Closed-vent system means a system that is not open to the atmosphere and is composed... emissions from individual process vents, stacks, open pieces of process equipment, equipment leaks... stock chests, and their associated vacuum pumps, filtrate tanks, foam breakers or tanks, and any other...

  11. 40 CFR 63.441 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... or live steam. Closed-vent system means a system that is not open to the atmosphere and is composed... emissions from individual process vents, stacks, open pieces of process equipment, equipment leaks... stock chests, and their associated vacuum pumps, filtrate tanks, foam breakers or tanks, and any other...

  12. 40 CFR 63.1326 - Batch process vents-recordkeeping provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins... requirements for Group 2 batch process vents that are exempt from the batch mass input limitation provisions...

  13. Two Vent Fields Discovered at the Ultraslow Spreading Arctic Ridge System

    NASA Astrophysics Data System (ADS)

    Pedersen, R. B.; Thorseth, I. H.; Hellevang, B.; Schultz, A.; Taylor, P.; Knudsen, H. P.; Steinsbu, B. O.

    2005-12-01

    Two high-temperature vent fields were discovered at the Mohns Ridge during an expedition with the Norwegian research vessel "G.O. Sars" in July 2005. Both vent fields are located within the southernmost segment of the Mohns Ridge approximately 50 km north of the West Jan Mayen Fracture Zone. Water depths along this segment range from 3800 meters close to the fracture zone to ~500 meters at the segment centre where the vent fields are located. The largest field - named "Gallionella Garden" - is situated within a rift graben where high- and low-temperature venting occurs along ridge-parallel normal faults and fissures. Presently we have documented high- and low-temperature venting along more then 2 km of the fault and fissure system in the area. The high-temperature venting takes place at around 550 mbsl at the base of a 100 meter high fault wall and was traced ~500 meters along strike. The field consists of at least 10 major vent sites, each composed of multiple chimneys that are up to 5-10 meters tall. There are also large areas of diffuse flow. The temperature of the vent fluids was measured to be above 260°C at a chimney orifice. This is at the boiling point of seawater at these water depths, and gas bubbling was observed at several of the vent sites. A sample of the top of a chimney consists of anhydrite, barite, sphalerite and pyrite. Outside the high-temperature vent area mounds of ferric iron are abundant. Such deposits have presently been traced along ~2 km of the faults and fissure system in the area. The deposits are predominantly made up of branching and twisted stalks comparable to those formed by the iron oxidizing bacteria Gallionella ferruginea showing that the precipitation is mediated by microbial activity. The temperatures below the upper crust of a mound were measured to be one degree above the ambient water temperature. The Fe-oxyhydroxides show Nd-isotope compositions similar to the basaltic crust and Sr-isotope compositions close to that of seawater, and may have formed from fluids composed of 90 percent seawater and 10 percent of an end-member hydrothermal fluid. Nd-concentrations suggest Fe-precipitate/fluid ratio of one to a million (ie. that 1 kg of Fe-deposits scavenged neodymium from one million litres of fluids). A second vent field was discovered 5 km southwest of "Gallionella Garden" at ~700 mbsl. The "Soria Moria" field is located at a volcanic ridge composed of recent lava flows and is about 100 meters across. The field consists of numerous chimneys emitting buoyant white smoker fluids, as well as irregular shaped mounds with flange structures discharging fluids of higher density then the ambient waters. White bacterial mats cover the seafloor and chimneys at both fields, and shrimp, sea spiders and colonies of sea anemones, crinoids and hydroids are associated with the vent fields. The hydrothermal plumes were detected acoustically using the exceptionally sensitive scientific echo sounders on "G.O.Sars". The acoustic backscatters images show that the hydrothermal plume above "Gallionella Garden" perturb the upper hydrographical layers, implying that this shallow vent field may "fertilize" the productive hydrographical layers in the area.

  14. 40 CFR 63.7184 - What emission limitations, operating limits, and work practice standards must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Pollutants for Semiconductor Manufacturing Emission Standards § 63.7184 What emission limitations, operating... this section on and after the compliance dates specified in § 63.7183. (b) Process vents—organic HAP emissions. For each organic HAP process vent, other than process vents from storage tanks, you must limit...

  15. 40 CFR 63.7184 - What emission limitations, operating limits, and work practice standards must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Pollutants for Semiconductor Manufacturing Emission Standards § 63.7184 What emission limitations, operating... this section on and after the compliance dates specified in § 63.7183. (b) Process vents—organic HAP emissions. For each organic HAP process vent, other than process vents from storage tanks, you must limit...

  16. 40 CFR 63.441 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... flash steam from the digester or live steam. Closed-vent system means a system that is not open to the... this subpart, including emissions from individual process vents, stacks, open pieces of process... stock chests, and their associated vacuum pumps, filtrate tanks, foam breakers or tanks, and any other...

  17. 40 CFR 63.441 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... flash steam from the digester or live steam. Closed-vent system means a system that is not open to the... this subpart, including emissions from individual process vents, stacks, open pieces of process... stock chests, and their associated vacuum pumps, filtrate tanks, foam breakers or tanks, and any other...

  18. 40 CFR 63.441 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... flash steam from the digester or live steam. Closed-vent system means a system that is not open to the... this subpart, including emissions from individual process vents, stacks, open pieces of process... stock chests, and their associated vacuum pumps, filtrate tanks, foam breakers or tanks, and any other...

  19. 40 CFR 65.65 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Monitoring. 65.65 Section 65.65 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Process Vents § 65.65 Monitoring. (a) An owner or operator of a Group 2A process vent...

  20. Minutes of the Explosives Safety Seminar (19th) Held at Los Angeles, California, 9-10-11 September 1980. Volume 1

    DTIC Science & Technology

    1980-01-01

    DOUBLE-BASE EXTRUSION COMPOSITIONS ................................... 89 Messrs. Craig E. Johnson and Paul F. Dendor V I GUN PROPELLANT PROPAGATION IN...Mullins and C. F. Baker RESULTS AND ANALYSIS OF STRENGTHENED STEEL BUILDING BLAST TESTS ..... 165 Messrs. Frederic E. Sock, Norval Dobbs, Paul Price and...347 Mr. J. Paul Glenn I viLR SESSION - EXPLOSION CONTAIMENT & VENTING Moderator - Mr. Irving Forsten EXPLOSION CONTAINMENT VESSELS AND M4TERIALS

  1. 40 CFR 65.140 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FEDERAL AIR RULE Closed Vent Systems, Control Devices, and Routing to a Fuel Gas System or a Process § 65..., shutdown, and malfunction provisions in § 65.6) apply to routing emissions to processes, fuel gas systems, closed vent systems, control devices, and recovery devices where another subpart expressly references the...

  2. 40 CFR 63.1254 - Standards: Process vents.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) National Emission Standards for Pharmaceuticals Production § 63.1254 Standards: Process vents. (a) Existing... weight; and (3) The production-indexed HAP consumption factor for the 12-month period in which the..., as calibrated on methane or the predominant HAP, of 20 ppmv or less, and an outlet concentration of...

  3. 40 CFR 63.1254 - Standards: Process vents.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Standards for Pharmaceuticals Production § 63.1254 Standards: Process vents. (a) Existing sources. For each... weight; and (3) The production-indexed HAP consumption factor for the 12-month period in which the..., as calibrated on methane or the predominant HAP, of 20 ppmv or less, and an outlet concentration of...

  4. 40 CFR 63.1254 - Standards: Process vents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) National Emission Standards for Pharmaceuticals Production § 63.1254 Standards: Process vents. (a) Existing... weight; and (3) The production-indexed HAP consumption factor for the 12-month period in which the..., as calibrated on methane or the predominant HAP, of 20 ppmv or less, and an outlet concentration of...

  5. 40 CFR 63.1254 - Standards: Process vents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards for Pharmaceuticals Production § 63.1254 Standards: Process vents. (a) Existing sources. For each... weight; and (3) The production-indexed HAP consumption factor for the 12-month period in which the..., as calibrated on methane or the predominant HAP, of 20 ppmv or less, and an outlet concentration of...

  6. 40 CFR 63.1254 - Standards: Process vents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards for Pharmaceuticals Production § 63.1254 Standards: Process vents. (a) Existing sources. For each... weight; and (3) The production-indexed HAP consumption factor for the 12-month period in which the..., as calibrated on methane or the predominant HAP, of 20 ppmv or less, and an outlet concentration of...

  7. 40 CFR 63.7890 - What emissions limitations and work practice standards must I meet for process vents?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... total organic compounds (TOC) (minus methane and ethane) to a level below 1.4 kg/hr and 2.8 Mg/yr (3.0... process vents the emissions of TOC (minus methane and ethane) by 95 percent by weight or more. (c) For...

  8. 40 CFR 63.645 - Test methods and procedures for miscellaneous process vents.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applicable to the process vent. (iv) Design analysis based on accepted chemical engineering principles..., dry standard cubic meters per minute, at a temperature of 20 °C. (g) Engineering assessment may be... the highest daily emission rate. (1) Engineering assessment includes, but is not limited to, the...

  9. 40 CFR 63.7892 - What are my inspection and monitoring requirements for process vents?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 14 2014-07-01 2014-07-01 false What are my inspection and monitoring requirements for process vents? 63.7892 Section 63.7892 Protection of Environment ENVIRONMENTAL PROTECTION... SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Site Remediation...

  10. 40 CFR 63.7892 - What are my inspection and monitoring requirements for process vents?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 13 2011-07-01 2011-07-01 false What are my inspection and monitoring requirements for process vents? 63.7892 Section 63.7892 Protection of Environment ENVIRONMENTAL PROTECTION... SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Site Remediation...

  11. 40 CFR 63.7892 - What are my inspection and monitoring requirements for process vents?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What are my inspection and monitoring requirements for process vents? 63.7892 Section 63.7892 Protection of Environment ENVIRONMENTAL PROTECTION... SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Site Remediation...

  12. 40 CFR 63.7892 - What are my inspection and monitoring requirements for process vents?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my inspection and monitoring requirements for process vents? 63.7892 Section 63.7892 Protection of Environment ENVIRONMENTAL PROTECTION... SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Site Remediation...

  13. 40 CFR 63.7937 - How do I demonstrate initial compliance with the general standards?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with the general standards? 63.7937 Section 63.7937 Protection of Environment ENVIRONMENTAL PROTECTION... SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Site Remediation... remediation material treated or managed by the process vented through the affected process vents has an...

  14. 40 CFR 63.7892 - What are my inspection and monitoring requirements for process vents?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 14 2013-07-01 2013-07-01 false What are my inspection and monitoring requirements for process vents? 63.7892 Section 63.7892 Protection of Environment ENVIRONMENTAL PROTECTION... SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Site Remediation...

  15. 40 CFR 63.1428 - Process vent requirements for group determination of PMPUs using a nonepoxide organic HAP to make...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Hazardous Air Pollutant Emissions for Polyether Polyols Production § 63.1428 Process vent requirements for... make or modify a polyether polyol for a PMPU are less than 11,800 kg/yr, the owner or operator of that...

  16. 40 CFR 63.1425 - Process vent control requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards for Hazardous Air Pollutant Emissions for Polyether Polyols Production § 63.1425 Process vent... operators of all affected sources using epoxides in the production of polyether polyols are subject to the... (c) of this section only if epoxides are used in the production of polyether polyols and nonepoxide...

  17. 40 CFR 63.107 - Identification of process vents subject to this subpart.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... to this subpart. 63.107 Section 63.107 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... going to a fuel gas system as defined in § 63.101. (4) A gas stream exiting a control device used to... transfer operation vent subject to § 63.119 or § 63.126. (8) A vent from a waste management unit subject to...

  18. 40 CFR 63.2460 - What requirements must I meet for batch process vents?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (ii) When you conduct a performance test or design evaluation for a non-flare control device used to... paragraphs (c)(9)(ii)(A) through (D) of this section. The design evaluation option for small control devices...) of this section. (b) Group status. If a process has batch process vents, as defined in § 63.2550, you...

  19. 40 CFR 63.2460 - What requirements must I meet for batch process vents?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (ii) When you conduct a performance test or design evaluation for a non-flare control device used to... paragraphs (c)(9)(ii)(A) through (D) of this section. The design evaluation option for small control devices...) of this section. (b) Group status. If a process has batch process vents, as defined in § 63.2550, you...

  20. 40 CFR 63.2460 - What requirements must I meet for batch process vents?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... (ii) When you conduct a performance test or design evaluation for a non-flare control device used to... paragraphs (c)(9)(ii)(A) through (D) of this section. The design evaluation option for small control devices... (c) of this section. (b) Group status. If a process has batch process vents, as defined in § 63.2550...

  1. 40 CFR 63.2460 - What requirements must I meet for batch process vents?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... (ii) When you conduct a performance test or design evaluation for a non-flare control device used to... paragraphs (c)(9)(ii)(A) through (D) of this section. The design evaluation option for small control devices... (c) of this section. (b) Group status. If a process has batch process vents, as defined in § 63.2550...

  2. 40 CFR 63.2460 - What requirements must I meet for batch process vents?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... (ii) When you conduct a performance test or design evaluation for a non-flare control device used to... paragraphs (c)(9)(ii)(A) through (D) of this section. The design evaluation option for small control devices... (c) of this section. (b) Group status. If a process has batch process vents, as defined in § 63.2550...

  3. Spatial and Alignment Analyses for a field of Small Volcanic Vents South of Pavonis Mons Mars

    NASA Technical Reports Server (NTRS)

    Bleacher, J. E.; Glaze, L. S.; Greeley, R.; Hauber, E.; Baloga, S. M.; Sakimoto, S. E. H.; Williams, D. A.; Glotch, T. D.

    2008-01-01

    The Tharsis province of Mars displays a variety of small volcanic vent (10s krn in diameter) morphologies. These features were identified in Mariner and Viking images [1-4], and Mars Orbiter Laser Altimeter (MOLA) data show them to be more abundant than originally observed [5,6]. Recent studies are classifying their diverse morphologies [7-9]. Building on this work, we are mapping the location of small volcanic vents (small-vents) in the Tharsis province using MOLA, Thermal Emission Imaging System, and High Resolution Stereo Camera data [10]. Here we report on a preliminary study of the spatial and alignment relationships between small-vents south of Pavonis Mons, as determined by nearest neighbor and two-point azimuth statistical analyses. Terrestrial monogenetic volcanic fields display four fundamental characteristics: 1) recurrence rates of eruptions,2 ) vent abundance, 3) vent distribution, and 4) tectonic relationships [11]. While understanding recurrence rates typically requires field measurements, insight into vent abundance, distribution, and tectonic relationships can be established by mapping of remotely sensed data, and subsequent application of spatial statistical studies [11,12], the goal of which is to link the distribution of vents to causal processes.

  4. Management of turbidity current venting in reservoirs under different bed slopes.

    PubMed

    Chamoun, Sabine; De Cesare, Giovanni; Schleiss, Anton J

    2017-12-15

    The lifetime and efficiency of dams is endangered by the process of sedimentation. To ensure the sustainable use of reservoirs, many sediment management techniques exist, among which venting of turbidity currents. Nevertheless, a number of practical questions remain unanswered due to a lack of systematic investigations. The present research introduces venting and evaluates its performance using an experimental model. In the latter, turbidity currents travel on a smooth bed towards the dam and venting is applied through a rectangular bottom outlet. The combined effect of outflow discharge and bed slopes on the sediment release efficiency of venting is studied based on different criteria. Several outflow discharges are tested using three different bed slopes (i.e., 0%, 2.4% and 5.0%). Steeper slopes yield higher venting efficiency. Additionally, the optimal outflow discharge leading to the largest venting efficiency with the lowest water loss increases when moving from the horizontal bed to the inclined positions. Copyright © 2017 Elsevier Ltd. All rights reserved.

  5. 22. STEEL ARCH SEGMENT AND VENT IN OFFICE, ROOM 2351, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. STEEL ARCH SEGMENT AND VENT IN OFFICE, ROOM 2351, SECOND FLOOR, NORTH SIDE. - Hughes Aircraft Company, Processing & Electronics Building, 6775 Centinela Avenue, Los Angeles, Los Angeles County, CA

  6. 40 CFR 63.2450 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... values are available for at least two of the 15-minute periods during an hour when calibration, quality... during periods of startup, shutdown, and malfunction (SSM), and you must meet the requirements specified...., continuous process vents, batch process vents, storage tanks, transfer operations, and waste management units...

  7. 40 CFR 63.2450 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... values are available for at least two of the 15-minute periods during an hour when calibration, quality..., except during periods of startup, shutdown, and malfunction (SSM), and you must meet the requirements...., continuous process vents, batch process vents, storage tanks, transfer operations, and waste management units...

  8. 40 CFR 63.1426 - Process vent requirements for determining organic HAP concentration, control efficiency, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... National Emission Standards for Hazardous Air Pollutant Emissions for Polyether Polyols Production § 63... percent reduction may be measured as total epoxide, total organic HAP, or as TOC minus methane and ethane... TOC (minus methane and ethane) concentrations in all process vent streams and primary and secondary...

  9. 40 CFR 63.1426 - Process vent requirements for determining organic HAP concentration, control efficiency, and...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... National Emission Standards for Hazardous Air Pollutant Emissions for Polyether Polyols Production § 63... percent reduction may be measured as total epoxide, total organic HAP, or as TOC minus methane and ethane... TOC (minus methane and ethane) concentrations in all process vent streams and primary and secondary...

  10. 40 CFR 63.640 - Applicability and designation of affected source.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reformer catalyst regeneration vents, and sulfur plant vents; and (5) Emission points routed to a fuel gas... required for refinery fuel gas systems or emission points routed to refinery fuel gas systems. (e) The... petroleum refining process unit that is subject to this subpart; (3) Units processing natural gas liquids...

  11. 40 CFR 63.640 - Applicability and designation of affected source.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... reformer catalyst regeneration vents, and sulfur plant vents; and (5) Emission points routed to a fuel gas... required for refinery fuel gas systems or emission points routed to refinery fuel gas systems. (e) The... petroleum refining process unit that is subject to this subpart; (3) Units processing natural gas liquids...

  12. 40 CFR 63.1103 - Source category-specific applicability, definitions, and requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... separation of raw materials and by-products from the stabilized polymer. Front end process vent means any... vent systems, control devices, recovery devices, and routing to a fuel gas system or a process), as... allow worker access; passage of material into or out of the enclosure by conveyor, vehicles, or other...

  13. 40 CFR 65.149 - Boilers and process heaters.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... stream is not introduced as or with the primary fuel, a temperature monitoring device in the fire box...-throughput transfer racks, as applicable, shall meet the requirements of this section. (2) The vent stream... thermal units per hour) or greater. (ii) A boiler or process heater into which the vent stream is...

  14. 40 CFR 63.7937 - How do I demonstrate initial compliance with the general standards?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... compliance with the general standards? 63.7937 Section 63.7937 Protection of Environment ENVIRONMENTAL... Remediation General Compliance Requirements § 63.7937 How do I demonstrate initial compliance with the general... remediation material treated or managed by the process vented through the affected process vents has an...

  15. 40 CFR 63.7937 - How do I demonstrate initial compliance with the general standards?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... compliance with the general standards? 63.7937 Section 63.7937 Protection of Environment ENVIRONMENTAL... Remediation General Compliance Requirements § 63.7937 How do I demonstrate initial compliance with the general... remediation material treated or managed by the process vented through the affected process vents has an...

  16. 40 CFR 63.7937 - How do I demonstrate initial compliance with the general standards?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... compliance with the general standards? 63.7937 Section 63.7937 Protection of Environment ENVIRONMENTAL... Remediation General Compliance Requirements § 63.7937 How do I demonstrate initial compliance with the general... remediation material treated or managed by the process vented through the affected process vents has an...

  17. 40 CFR 63.7937 - How do I demonstrate initial compliance with the general standards?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Remediation General Compliance Requirements § 63.7937 How do I demonstrate initial compliance with the general... remediation material treated or managed by the process vented through the affected process vents has an..., according to the procedures § 63.7943, and recorded the average VOHAP concentration of the remediation...

  18. Coupled fluid and solid evolution in analogue volcanic vents

    NASA Astrophysics Data System (ADS)

    Solovitz, Stephen A.; Ogden, Darcy E.; Kim, Dave (Dae-Wook); Kim, Sang Young

    2014-07-01

    Volcanic eruptions emit rock particulates and gases at high speed and pressure, which change the shape of the surrounding rock. Simplified analytical solutions, field studies, and numerical models suggest that this process plays an important role in the behavior and hazards associated with explosive volcanic eruptions. Here we present results from a newly developed laboratory-scale apparatus designed to study this coupled process. The experiments used compressed air jets expanding into the laboratory through fabricated rock analogue material, which evolves through time during the experiment. The compressed air was injected at approximately 2.5 times atmospheric pressure. We fabricated rock analogues from sand and steel powder samples with a three-dimensional printing process. We studied the fluid development using phase-locked particle image velocimetry, while simultaneously observing the solid development via a video camera. We found that the fluid response was much more rapid than that of the solid, permitting a quasi-steady approximation. In most cases, the solid vent flared out rapidly, increasing its diameter by 20 to 100%. After the initial expansion, the vent and flow field achieved a near-steady condition for a long duration. The new expanded vent shapes permitted lower vent exit pressures and larger jet radii. In one experiment, after an initial vent shape development and establishment of steady flow behavior, rock failure occurred a second time, resulting in a new exit diameter and new steady state. This second failure was not precipitated by changes in the nozzle flow condition, and it radically changed the downstream flow dynamics. This experiment suggests that the brittle nature of volcanic host rock enables sudden vent expansion in the middle of an eruption without requiring a change in the conduit flow.

  19. 40 CFR 63.7941 - How do I conduct a performance test, design evaluation, or other type of initial compliance...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... vent; Ei, Eo = Mass rate of total organic compounds (TOC) (minus methane and ethane) or total HAP, from... reduction for all affected process vents, percent Ei = Mass rate of TOC (minus methane and ethane) or total... uncontrolled vents, as calculated in this section, kilograms TOC per hour or kilograms HAP per hour; Eo = Mass...

  20. 40 CFR 63.1015 - Closed vent systems and control devices; or emissions routed to a fuel gas system or process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Closed vent systems and control... this part, except as provided in § 63.1002(b). (2) Owners or operators of closed vent systems and... in subpart SS of this part, except as provided in § 63.1002(b). (3) Owners or operators routing...

  1. Improved thermodynamic modeling of the no-vent fill process and correlation with experimental data

    NASA Technical Reports Server (NTRS)

    Taylor, William J.; Chato, David J.

    1991-01-01

    The United States' plans to establish a permanent manned presence in space and to explore the Solar System created the need to efficiently handle large quantities of subcritical cryogenic fluids, particularly propellants such as liquid hydrogen and liquid oxygen, in low- to zero-gravity environments. One of the key technologies to be developed for fluid handling is the ability to transfer the cryogens between storage and spacecraft tanks. The no-vent fill method was identified as one way to perform this transfer. In order to understand how to apply this method, a model of the no-vent fill process is being developed and correlated with experimental data. The verified models then can be used to design and analyze configurations for tankage and subcritical fluid depots. The development of an improved macroscopic thermodynamic model is discussed of the no-vent fill process and the analytical results from the computer program implementation of the model are correlated with experimental results for two different test tanks.

  2. 40 CFR 63.1427 - Process vent requirements for processes using extended cookout as an epoxide emission reduction...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... epoxides, and that are using ECO as a control technique to reduce epoxide emissions in order to comply with... provisions of this section. The owner or operator that is using ECO in order to comply with the emission... used to further reduce the HAP emissions from a process vent already controlled by ECO, then the owner...

  3. Fissure near Cerberus Fossae with Tectonic Morphologies

    NASA Image and Video Library

    2014-01-15

    The linearity of the volcanic vent shown in this image observed by NASA Mars Reconnaissance Orbiter, in conjunction with evidence of lava flow from the vent, suggests control by combined volcano-tectonic processes.

  4. Impact of vent pipe diameter on characteristics of waste degradation in semi-aerobic bioreactor landfill.

    PubMed

    Jiang, Guobin; Liu, Dan; Chen, Weiming; Ye, Zhicheng; Liu, Hong; Li, Qibin

    2017-10-01

    The evolution mechanism of a vent pipe diameter on a waste-stabilization process in semi-aerobic bioreactor landfills was analyzed from the organic-matter concentration, biodegradability, spectral characteristics of dissolved organic matter, correlations and principal-component analysis. Waste samples were collected at different distances from the vent pipe and from different landfill layers in semi-aerobic bioreactor landfills with different vent pipe diameters. An increase in vent pipe diameter favored waste degradation. Waste degradation in landfills can be promoted slightly when the vent pipe diameter increases from 25 to 50 mm. It could be promoted significantly when the vent pipe diameter was increased to 75 mm. The vent pipe diameter is important in waste degradation in the middle layer of landfills. The dissolved organic matter in the waste is composed mainly of long-wave humus (humin), short-wave humus (fulvic acid) and tryptophan. The humification levels of the waste that was located at the center of vent pipes with 25-, 50- and 75-mm diameters were 2.2682, 4.0520 and 7.6419 Raman units, respectively. The appropriate vent pipe diameter for semi-aerobic bioreactor landfills with an 800-mm diameter was 75 mm. The effect of different vent pipe diameters on the degree of waste stabilization is reflected by two main components. Component 1 is related mainly to the content of fulvic acid, biologically degradable material and organic matter. Component 2 is related mainly to the content of tryptophan and humin from the higher vascular plants.

  5. Multipurpose Thermal Insulation Test Apparatus

    NASA Technical Reports Server (NTRS)

    Fesmire, James E. (Inventor); Augustynowicz, Stanislaw D. (Inventor)

    2002-01-01

    A multi-purpose thermal insulation test apparatus is used for testing insulation materials, or other components. The test apparatus is a fluid boil-off calorimeter system for calibrated measurement of the apparent thermal conductivity (k-value) of a specimen material at a fixed vacuum level. The apparatus includes an inner vessel for receiving a fluid with a normal boiling point below ambient temperature, such as liquid nitrogen, enclosed within a vacuum chamber. A cold mass assembly, including the inner vessel and thermal guards, is suspended from the top of the vacuum chamber. Handling tools attach to the cold mass assembly for convenient manipulation of the assembly and for the installation or wrapping of insulation test materials. Liquid nitrogen is typically supplied to the inner vessel using a fill tube with funnel. A single port through the top of the vacuum chamber facilitates both filling and venting. Aerogel composite stacks with reflective films are fastened to the top and the bottom of the inner vessel as thermal guards. The comparative k-value of the insulation material is determined by measuring the boil-off flow rate of gas, the temperature differential across the insulation thickness, and the dimensions (length and diameters) of the test specimen.

  6. Tephra Sedimentation from a Short-term Wind-affected Volcanic Plume of the 8 October 2016 Aso Nakadake Eruption, Japan

    NASA Astrophysics Data System (ADS)

    Tsuji, T.; Nishizaka, N.; Onishi, K.

    2017-12-01

    Sedimentation processes during explosive volcanic eruptions can be constrained based on detailed analysis of grain-size variation of tephra deposits. Especially, an accurate description of the amount of fine particles has also significant implications for the assessment of specific tephra hazards. Grain size studies for single short-term eruption has advantage to contribute understanding the sedimentation processes because it is simple compared to long-lasting eruption. The 2016 Aso Nakadake eruption, Japan represents an ideal for the study of short-term eruptions thanks to an accurate investigation. Then, we investigate the grain size variation with distance from the vent and sedimentological features of the deposit to discuss the sedimentation processes of the tephra fragments. The eruption provided pyroclastic flow deposit and fallout tephra which distributed NE to ENE direction from the vent. The deposits between 4 and 20 km from vent consist of fine-coated lapilli to coarse ash, ash pellet and mud droplet in ascending degree. The samples are lapilli-bearing within 20 km from vent and those outside of 20 km mainly consist of ash particles. Detailed analyses of individual samples highlight a rapid decay of maximum and mean grain size for the deposit from proximal to distal. The decay trend of maximum grain-size is approximated by three segments of exponential curves with two breaks-in-slope at 10 and 40 km from vent. Most of the sampled deposits are characterized by bimodal grain-size distributions, with the modes of the coarse subpopulation decreasing with distance from vent and those of the fine subpopulation being mostly stable. The fine subpopulation has been interpreted as being mostly associated with size-selective sedimentation processes (e.g., particle aggregation) confirmed by the existence of fine-coated particles, ash pellet and mud droplet. As the fine-coated particles generally have a higher terminal velocity than the individual constituent particles, those could be related with the rapid decrease of maximum grain-size with distance from vent at proximal area. Further detail grain-size analyses and theoretical studies can be contributed to understand the effect of fine ash aggregation on sedimentation processes quantitatively.

  7. 40 CFR 65.167 - Other reports.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FEDERAL AIR RULE Closed Vent Systems, Control Devices, and Routing to a Fuel Gas System or a Process § 65... reporting and shall include a description of any changes made to the closed vent system. (b) Startup...

  8. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...

  9. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...

  10. Fluid Flow and Sound Generation at Hydrothermal Vent Fields

    DTIC Science & Technology

    1988-04-01

    Pacific Rise The first evidence of vent sound generation came from data collected near hydrothermal vents at 21 N on the EPR where an array of ocean...associated with hydrothermal centers, one at 21 N on the East Pacific Rise (EPR) (Reidesel et al., 1982) and one on the Juan de Fuca Ridge (Bibee and Jacobson... East Pacific Rise at 210 N : the volcanic, tectonic and hydrothermal processes at

  11. Thermodynamic modeling of the no-vent fill methodology for transferring cryogens in low gravity

    NASA Technical Reports Server (NTRS)

    Chato, David J.

    1988-01-01

    The filling of tanks with cryogens in the low-gravity environment of space poses many technical challenges. Chief among these is the inability to vent only vapor from the tank as the filling proceeds. As a potential solution to this problem, the NASA Lewis Research Center is researching a technique known as No-Vent Fill. This technology potentially has broad application. The focus is the fueling of space based Orbital Transfer Vehicles. The fundamental thermodynamics of the No-Vent Fill process to develop an analytical model of No-Vent Fill is described. The model is then used to conduct a parametric investigation of the key parameters: initial tank wall temperature, liquid-vapor interface heat transfer rate, liquid inflow rate, and inflowing liquid temperatures. Liquid inflowing temperature and the liquid-vapor interface heat transfer rate seem to be the most significant since they influence the entire fill process. The initial tank wall temperature must be sufficiently low to prevent a rapid pressure rise during the initial liquid flashing stage, but then becomes less significant.

  12. 40 CFR 63.11940 - What continuous monitoring requirements must I meet for control devices required to install CPMS...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... consistent with the manufacturer's recommendations within 15 days or by the next time any process vent stream... the manufacturer's recommendations within 15 days or by the next time any process vent stream is...) Determine gas stream flow using the design blower capacity, with appropriate adjustments for pressure drop...

  13. 40 CFR Table 2 to Subpart Ffff of... - Emission Limits and Work Practice Standards for Batch Process Vents

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Pollutants: Miscellaneous Organic Chemical Manufacturing Pt. 63, Subpt. FFFF, Table 2 Table 2 to Subpart FFFF... Group 1 batch process vents a. Reduce collective uncontrolled organic HAP emissions from the sum of all... a flare); or Not applicable. b. Reduce collective uncontrolled organic HAP emissions from the sum of...

  14. 40 CFR 63.107 - Identification of process vents subject to this subpart.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... process vents associated with an air oxidation reactor, distillation unit, or reactor that is in a source.... (b) Some, or all, of the gas stream originates as a continuous flow from an air oxidation reactor... specified in paragraphs (c)(1) through (3) of this section. (1) Is directly from an air oxidation reactor...

  15. 40 CFR 63.136 - Process wastewater provisions-individual drain systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements of § 63.148 and the control device shall be designed, operated, and inspected in accordance with... that receives or manages a Group 1 wastewater stream or a residual removed from a Group 1 wastewater... cover and if vented, route the vapors to a process or through a closed vent system to a control device...

  16. 40 CFR 63.117 - Process vent provisions-reporting and recordkeeping requirements for group and TRE determinations...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and recordkeeping requirements for group and TRE determinations and performance tests. (a) Each owner or operator subject to the control provisions for Group 1 process vents in § 63.113(a) or the... recordkeeping requirements for group and TRE determinations and performance tests. 63.117 Section 63.117...

  17. 40 CFR 63.136 - Process wastewater provisions-individual drain systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements of § 63.148 and the control device shall be designed, operated, and inspected in accordance with... that receives or manages a Group 1 wastewater stream or a residual removed from a Group 1 wastewater... cover and if vented, route the vapors to a process or through a closed vent system to a control device...

  18. 40 CFR 63.136 - Process wastewater provisions-individual drain systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements of § 63.148 and the control device shall be designed, operated, and inspected in accordance with... that receives or manages a Group 1 wastewater stream or a residual removed from a Group 1 wastewater... cover and if vented, route the vapors to a process or through a closed vent system to a control device...

  19. 40 CFR 63.136 - Process wastewater provisions-individual drain systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements of § 63.148 and the control device shall be designed, operated, and inspected in accordance with... that receives or manages a Group 1 wastewater stream or a residual removed from a Group 1 wastewater... cover and if vented, route the vapors to a process or through a closed vent system to a control device...

  20. 40 CFR 63.117 - Process vent provisions-reporting and recordkeeping requirements for group and TRE determinations...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and recordkeeping requirements for group and TRE determinations and performance tests. (a) Each owner or operator subject to the control provisions for Group 1 process vents in § 63.113(a) or the... recordkeeping requirements for group and TRE determinations and performance tests. 63.117 Section 63.117...

  1. 40 CFR 65.67 - Reporting provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., organic HAP or TOC concentration, and/or TRE index value required under § 65.63(f) and recorded under § 65... 2B process vent, the organic HAP or TOC concentration of the vent stream is recalculated according to...

  2. Insights into shallow magmatic processes at Kīlauea Volcano, Hawaíi, from a multiyear continuous gravity time series

    NASA Astrophysics Data System (ADS)

    Poland, Michael P.; Carbone, Daniele

    2016-07-01

    Continuous gravity data collected near the summit eruptive vent at Kīlauea Volcano, Hawaíi, during 2011-2015 show a strong correlation with summit-area surface deformation and the level of the lava lake within the vent over periods of days to weeks, suggesting that changes in gravity reflect variations in volcanic activity. Joint analysis of gravity and lava level time series data indicates that over the entire time period studied, the average density of the lava within the upper tens to hundreds of meters of the summit eruptive vent remained low—approximately 1000-1500 kg/m3. The ratio of gravity change (adjusted for Earth tides and instrumental drift) to lava level change measured over 15 day windows rose gradually over the course of 2011-2015, probably reflecting either (1) a small increase in the density of lava within the eruptive vent or (2) an increase in the volume of lava within the vent due to gradual vent enlargement. Superimposed on the overall time series were transient spikes of mass change associated with inflation and deflation of Kīlauea's summit and coincident changes in lava level. The unexpectedly strong mass variations during these episodes suggest magma flux to and from the shallow magmatic system without commensurate deformation, perhaps indicating magma accumulation within, and withdrawal from, void space—a process that might not otherwise be apparent from lava level and deformation data alone. Continuous gravity data thus provide unique insights into magmatic processes, arguing for continued application of the method at other frequently active volcanoes.

  3. 40 CFR 65.155 - Other control devices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) CONSOLIDATED FEDERAL AIR RULE Closed Vent Systems, Control Devices, and Routing to a Fuel Gas System or a Process § 65.155 Other control devices. (a) Other control device equipment and operating requirements. (1... requirements specified in § 65.63(a)(2), or 40 CFR 60.562-1(a)(1)(i)(A) for process vents, or § 65.83(a)(1) for...

  4. 40 CFR 63.1426 - Process vent requirements for determining organic HAP concentration, control efficiency, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... percent reduction may be measured as total epoxide, total organic HAP, or as TOC minus methane and ethane... TOC (minus methane and ethane) concentrations in all process vent streams and primary and secondary... million by volume total epoxide or TOC limit in § 63.1425(b)(1)(ii) or (b)(2)(iii), the sampling site...

  5. 40 CFR 63.645 - Test methods and procedures for miscellaneous process vents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TOC emission rate, as specified under paragraph (f) of this section, the sampling site shall be after... process vent TOC mass flow rate is less than 33 kilograms per day for an existing source or less than 6.8... shall determine the TOC mass flow rate by the following procedures: (1) The sampling site shall be...

  6. 40 CFR 63.2480 - What requirements must I meet for equipment leaks?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affected source. (5) For pumps in light liquid service in an MCPU that has no continuous process vents and.../vapor and light liquid service at an existing source, you may elect to comply with the requirements in... light liquid service in an MCPU that has no continuous process vents and is part of an existing source...

  7. Removal of common organic solvents from aqueous waste streams via supercritical C02 extraction: a potential green approach to sustainable waste management in the pharmaceutical industry.

    PubMed

    Leazer, Johnnie L; Gant, Sean; Houck, Anthony; Leonard, William; Welch, Christopher J

    2009-03-15

    Supercritical CO2 extraction of aqueous streams is a convenient and effective method to remove commonly used solvents of varying polarities from aqueous waste streams. The resulting aqueous layers can potentially be sewered; whereas the organic layer can be recovered for potential reuse. Supercritical fluid extraction (SFE) is a technology that is increasingly being used in commercial processes (1). Supercritical fluids are well suited for extraction of a variety of media, including solids, natural products, and liquid products. Many supercritical fluids have low critical temperatures, allowing for extractions to be done at modestly low temperatures, thus avoiding any potential thermal decomposition of the solutes under study (2). Furthermore, the CO2 solvent strength is easily tuned by adjusting the density of the supercritical fluid (The density is proportional to the pressure of the extraction process). Since many supercritical fluids are gases at ambient temperature, the extract can be concentrated by simply venting the reaction mixture to a cyclone collection vessel, using appropriate safety protocols.

  8. Retrieving eruptive vent conditions from dynamical properties of unsteady volcanic plume using high-speed imagery and numerical simulations

    NASA Astrophysics Data System (ADS)

    Tournigand, Pierre-Yves; Taddeucci, Jacopo; José Peña Fernandez, Juan; Gaudin, Damien; Sesterhenn, Jörn; Scarlato, Piergiorgio; Del Bello, Elisabetta

    2016-04-01

    Vent conditions are key parameters controlling volcanic plume dynamics and the ensuing different hazards, such as human health issues, infrastructure damages, and air traffic disruption. Indeed, for a given magma and vent geometry, plume development and stability over time mainly depend on the mass eruption rate, function of the velocity and density of the eruptive mixture at the vent, where direct measurements are impossible. High-speed imaging of eruptive plumes and numerical jet simulations were here non-dimensionally coupled to retrieve eruptive vent conditions starting from measurable plume parameters. High-speed videos of unsteady, momentum-driven volcanic plumes (jets) from Strombolian to Vulcanian activity from three different volcanoes (Sakurajima, Japan, Stromboli, Italy, and Fuego, Guatemala) were recorded in the visible and the thermal spectral ranges by using an Optronis CR600x2 (1280x1024 pixels definition, 500 Hz frame rate) and a FLIR SC655 (640x480 pixels definition, 50 Hz frame rate) cameras. Atmospheric effects correction and pre-processing of the thermal videos were performed to increase measurement accuracy. Pre-processing consists of the extraction of the plume temperature gradient over time, combined with a temperature threshold in order to remove the image background. The velocity and the apparent surface temperature fields of the plumes, and their changes over timescales of tenths of seconds, were then measured by particle image velocimetry and thermal image analysis, respectively, of the pre-processed videos. The parameters thus obtained are representative of the outer plume surface, corresponding to its boundary shear layer at the interface with the atmosphere, and may significantly differ from conditions in the plume interior. To retrieve information on the interior of the plume, and possibly extrapolate it even at the eruptive vent level, video-derived plume parameters were non-dimensionally compared to the results of numerical simulations of momentum-driven gas jets impulsively released from a vent in a pressurized container. These simulations solve flow conditions globally, thus allowing one to set empirical relations between flow conditions in different parts of the jet, most notably the shear layer, the flow centerline, and at the vent. Applying these relations to the volcanic cases gives access to the evolution of velocity and temperature at the vent. From these, the speed of sound and flow Mach number can be obtained, which in turn can be used to estimate the pressure ratio between atmosphere and vent and finally, assuming some conduit geometry and mixture density, the total amount of erupted gas. Preliminary results suggest subsonic exit velocities of the eruptive mixture at the vent, and a plume centerline velocity that can be twice as fast as the one measured at the plume boundary.

  9. Explosive volcanism on Mercury: Analysis of vent and deposit morphology and modes of eruption

    NASA Astrophysics Data System (ADS)

    Jozwiak, Lauren M.; Head, James W.; Wilson, Lionel

    2018-03-01

    The MESSENGER mission revealed, for the first time, conclusive evidence of explosive volcanism on Mercury. Several previous works have cataloged the appearance and location of explosive volcanism on the planet using a variety of identifying characteristics, including vent presence and deposit color as seen in multispectral image mosaics. We present here a comprehensive catalog of vents of likely volcanic origin; our classification scheme emphasizes vent morphology. We have analyzed the morphologies of all vents in our catalog, and recognize three main morphologies: "simple vent", "pit vent", and "vent-with-mound". The majority of vents we identify are located within impact craters. The spatial distribution of vents does not correlate with the locations of volcanic smooth plains deposits, in contrast to the Moon, nor do vents correlate with the locations of large impact basins (except for the Caloris and Tolstoj basins). Using the degradation state of the vent host crater as a proxy for maximum age, we suggest that vent formation has been active through the Mansurian and into the Kuiperian periods, although the majority of vents were likely formed much earlier in mercurian history. The morphologies and locations of vents are used to investigate a set of plausible formation geometries. We find that the most likely and most prevalent formation geometry is that of a dike, stalled at depth, which then explosively vents to the surface. We compare the vent and deposit size of mercurian pyroclastic deposits with localized and regional lunar pyroclastic deposits, and find a range of possible eruption energies and corresponding variations in eruption style. Localized lunar pyroclastic deposits and the majority of mercurian pyroclastic deposits show evidence for eruption that is consistent with the magmatic foam at the top of a dike reaching a critical gas volume fraction. A subset of mercurian vents, including the prominent Copland-Rachmaninoff vent to the northeast of the Rachmaninoff basin, indicates eruption at enhanced gas volume fractions. This subset of vents shows a similar eruptive behavior to the lunar Orientale dark mantle ring deposit, suggesting that the dikes that formed these vents and deposits on Mercury underwent some form of additional volatile build-up either through crustal volatile incorporation or magma convection within the dike. There also exists a population of mercurian vents that no longer retain a visible associated pyroclastic deposit; we hypothesize that the visible signature of the pyroclastic deposit has been lost through space weathering and regolith mixing processes. Together, these results provide a comprehensive analysis of explosive volcanism on Mercury, and inform continued research on the thermal history of Mercury and magma composition and evolution.

  10. Repeat terrestrial lidar mapping of the new volcanic vent at Holuhraun, Iceland

    NASA Astrophysics Data System (ADS)

    Richardson, J. A.; Whelley, P.; Sutton, S.; Needham, D. H.; Byrne, S.; Hamilton, C.

    2016-12-01

    The locations and morphologies of volcanic vents are essential observations that inform models of volcanic processes on Earth and other planets. Post-eruption morphologic changes at vents are important to characterize in order to more confidently use data gathered from mapping volcanic terrains. We present two terrestrial lidar surveys of the recently formed volcanic vent that fed the Holuhraun lava flow in the Northeastern Region of Iceland. While many studies have measured erosion rate at older volcanic vents, these surveys were performed 6 and 18 months after the end of the eruption and present an opportunity to measure morphologic changes at a brand-new vent. The Holuhraun eruption began in August 2014 by effusing lava through a fissure and continued until February 2015, emplacing approximately 1.4 km³ of lava over nearly 85 km². During the eruption the predominant activity at the northern end of the fissure produced a large (50 m high, 500 m long) cinder-canyon with scoria covered flanks. Lava ponded within this vent and drained to form a primary channel to the northeast. As lava drained through the channel, high stands of lava were preserved as "bathtub rings" on the walls of the vent. Following the cessation of activity at Holuhraun, two lidar surveys were carried out inside the vent, in August 2015 and August 2016. A Riegl VZ-400 scanner was used to collect the point cloud data, which give a precise 3D model of the vent with relative accuracy of 15 cm between scan positions. Differences between the two 3D point clouds are used to distinguish between flow emplacement and post-flow modifications to the surface, and to quantify the surface erosion rate experienced by the young vent. Near-infrared (1550 nm wavelength) reflectance values can also be correlated to lava textures and materials within the vent, providing additional information about how the vent was built syn-eruption and how it degrades post-eruption.

  11. Nuclear reactor melt-retention structure to mitigate direct containment heating

    DOEpatents

    Tutu, Narinder K.; Ginsberg, Theodore; Klages, John R.

    1991-01-01

    A light water nuclear reactor melt-retention structure to mitigate the extent of direct containment heating of the reactor containment building. The structure includes a retention chamber for retaining molten core material away from the upper regions of the reactor containment building when a severe accident causes the bottom of the pressure vessel of the reactor to fail and discharge such molten material under high pressure through the reactor cavity into the retention chamber. In combination with the melt-retention chamber there is provided a passageway that includes molten core droplet deflector vanes and has gas vent means in its upper surface, which means are operable to deflect molten core droplets into the retention chamber while allowing high pressure steam and gases to be vented into the upper regions of the containment building. A plurality of platforms are mounted within the passageway and the melt-retention structure to direct the flow of molten core material and help retain it within the melt-retention chamber. In addition, ribs are mounted at spaced positions on the floor of the melt-retention chamber, and grid means are positioned at the entrance side of the retention chamber. The grid means develop gas back pressure that helps separate the molten core droplets from discharged high pressure steam and gases, thereby forcing the steam and gases to vent into the upper regions of the reactor containment building.

  12. 40 CFR 63.1034 - Closed vent systems and control devices; or emissions routed to a fuel gas system or process...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Closed vent systems and control devices; or emissions routed to a fuel gas system or process standards. 63.1034 Section 63.1034 Protection... stringent. The 20 parts per million by volume standard is not applicable to the provisions of § 63.1016. (ii...

  13. 40 CFR 63.1034 - Closed vent systems and control devices; or emissions routed to a fuel gas system or process...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 10 2011-07-01 2011-07-01 false Closed vent systems and control devices; or emissions routed to a fuel gas system or process standards. 63.1034 Section 63.1034 Protection... stringent. The 20 parts per million by volume standard is not applicable to the provisions of § 63.1016. (ii...

  14. Insights into shallow magmatic processes at Kīlauea Volcano, Hawaiʻi, from a multiyear continuous gravity time series

    USGS Publications Warehouse

    Poland, Michael P.; Carbone, Daniele

    2016-01-01

    Continuous gravity data collected near the summit eruptive vent at Kīlauea Volcano, Hawaiʻi, during 2011–2015 show a strong correlation with summit-area surface deformation and the level of the lava lake within the vent over periods of days to weeks, suggesting that changes in gravity reflect variations in volcanic activity. Joint analysis of gravity and lava level time series data indicates that over the entire time period studied, the average density of the lava within the upper tens to hundreds of meters of the summit eruptive vent remained low—approximately 1000–1500 kg/m3. The ratio of gravity change (adjusted for Earth tides and instrumental drift) to lava level change measured over 15 day windows rose gradually over the course of 2011–2015, probably reflecting either (1) a small increase in the density of lava within the eruptive vent or (2) an increase in the volume of lava within the vent due to gradual vent enlargement. Superimposed on the overall time series were transient spikes of mass change associated with inflation and deflation of Kīlauea's summit and coincident changes in lava level. The unexpectedly strong mass variations during these episodes suggest magma flux to and from the shallow magmatic system without commensurate deformation, perhaps indicating magma accumulation within, and withdrawal from, void space—a process that might not otherwise be apparent from lava level and deformation data alone. Continuous gravity data thus provide unique insights into magmatic processes, arguing for continued application of the method at other frequently active volcanoes.

  15. 40 CFR 65.142 - Standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of this subpart apply to Group 2A process vents. (c) Transfer rack requirements. The owner or... route transfer rack emissions through a closed vent system to a flare shall meet the applicable... requirements referenced therein. No other provisions of this subpart apply to transfer rack emissions routed...

  16. Temporal change in megafauna at the Rose Garden hydrothermal vent (Galapagos Rift; eastern tropical Pacific)

    NASA Astrophysics Data System (ADS)

    Hessler, Robert R.; Smithey, William M.; Boudrias, Michel A.; Keller, Clifford H.; Lutz, Richard A.; Childress, James J.

    1988-10-01

    Hydrothermal vent communities must undergo substantial temporal change because of their dynamic physical milieu. This was verified in March 1985, when the Rose Garden hydrothermal vent on the Galapagos Rift was revisited after 5 1/4 years' absence. Comparison of photographs from the two visits revealed considerable faunal change. Among the hosts to chemoautotrophic bacteria, vestimentiferans were reduced from dominance to very low numbers. The mytilid was now extremely abundant and dominated vent openings. Vesicomyids also were more abundant. In general, vent-field suspension feeders had declined; anemones were distinctly less abundant, and siphonophores and enteropneusts were virtually absent. The decline of serpulids was likely, but less obvious. Of the mobile scavengers and carnivores, both galatheids and whelks were distincly more common. These community changes appear to result from both continuing recruitment and changes in the physical milieu. While the growth of some populations could have resulted from expanding opportunities, the population of at least one, the vesicomyid, had not achieved carrying capacity in 1979, and this could have pertained to others as well. The decrease of vestimentiferans may have been caused by declining vent-water flux, a process that would favor mytilids, or more complete vent-water filtration by the mytilids themselves. The same factors also could explain the reduction of vent-field filter feeders. These observations suggest that early stages in the cycle of Galapagos-type vent communities are likely to be dominated by vestimentiferans, but that bivalves will replace them with time.

  17. Inhibition of Titanium In Fuming Nitric Acid

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RITTENHOUSE, J. B.; PAPP, C. A.

    1958-06-01

    Storage tests were conducted to determine the effectiveness of oxygen in inhibiting the corrosion reaction of titanium in fuming nitric acid (FNA). In these tests, which were of 28 days duration at a temperature of 30 C, the samples investigated were ½-inch squares (0.020 inch thick) of commercially pure titanium (75A) and a binary 8 percent-manganese alloy (C110M). The specimens were stored in Teflon-lined aluminum pressure vessels at 50 percent ullage. The pressure vessels were of the following types: vented to the atmosphere, sealed with air in the vapor space, sealed with oxygen atmosphere in the vapor space, and equippedmore » for a 1-ml/minute oxygen flow through the vapor space. Finally, results of the investigation indicated no inhibition of titanium corrosion by oxygen, but confirmed the inhibiting effect of a water content of 1 to 2 percent by weight in the FNA.« less

  18. Identification and mitigation of stray laser light in the Thomson scattering system on the Madison Symmetric Torus (MST).

    PubMed

    Jacobson, C M; Borchardt, M T; Den Hartog, D J; Falkowski, A F; Morton, L A; Thomas, M A

    2016-11-01

    The Thomson scattering diagnostic on the Madison Symmetric Torus (MST) records excessive levels of stray Nd:YAG laser light. Stray light saturates the 1064 nm spectral channel in all polychromators, which prevents absolute electron density measurements via Rayleigh scattering calibration. Furthermore, stray light contaminates adjacent spectral channels for r/a ≥ 0.75, which renders the diagnostic unable to make electron temperature measurements at these radii. In situ measurements of stray light levels during a vacuum vessel vent are used to identify stray light sources and strategies for reduction of stray light levels. Numerical modeling using Zemax OpticStudio supports these measurements. The model of the vacuum vessel and diagnostic includes synthetic collection optics to enable direct comparison of measured and simulated stray light levels. Modeling produces qualitatively similar stray light distributions to MST measurements, and quantifies the mitigation effects of stray light mitigation strategies prior to implementation.

  19. Identification and mitigation of stray laser light in the Thomson scattering system on the Madison Symmetric Torus (MST)

    NASA Astrophysics Data System (ADS)

    Jacobson, C. M.; Borchardt, M. T.; Den Hartog, D. J.; Falkowski, A. F.; Morton, L. A.; Thomas, M. A.

    2016-11-01

    The Thomson scattering diagnostic on the Madison Symmetric Torus (MST) records excessive levels of stray Nd:YAG laser light. Stray light saturates the 1064 nm spectral channel in all polychromators, which prevents absolute electron density measurements via Rayleigh scattering calibration. Furthermore, stray light contaminates adjacent spectral channels for r/a ≥ 0.75, which renders the diagnostic unable to make electron temperature measurements at these radii. In situ measurements of stray light levels during a vacuum vessel vent are used to identify stray light sources and strategies for reduction of stray light levels. Numerical modeling using Zemax OpticStudio supports these measurements. The model of the vacuum vessel and diagnostic includes synthetic collection optics to enable direct comparison of measured and simulated stray light levels. Modeling produces qualitatively similar stray light distributions to MST measurements, and quantifies the mitigation effects of stray light mitigation strategies prior to implementation.

  20. Insulation Test Cryostat with Lift Mechanism

    NASA Technical Reports Server (NTRS)

    Dokos, Adam G. (Inventor); Fesmire, James E. (Inventor)

    2014-01-01

    A multi-purpose, cylindrical thermal insulation test apparatus is used for testing insulation materials and systems of materials using a liquid boil-off calorimeter system for absolute measurement of the effective thermal conductivity (k-value) and heat flux of a specimen material at a fixed environmental condition (cold-side temperature, warm-side temperature, vacuum pressure level, and residual gas composition). The apparatus includes an inner vessel for receiving a liquid with a normal boiling point below ambient temperature, such as liquid nitrogen, enclosed within a vacuum chamber. A cold mass assembly, including the upper and lower guard chambers and a middle test vessel, is suspended from a lid of the vacuum canister. Each of the three chambers is filled and vented through a single feedthrough. All fluid and instrumentation feedthroughs are mounted and suspended from a top domed lid to allow easy removal of the cold mass. A lift mechanism allows manipulation of the cold mass assembly and insulation test article.

  1. Insulation Test Cryostat with Lift Mechanism

    NASA Technical Reports Server (NTRS)

    Fesmire, James E. (Inventor); Dokos, Adam G. (Inventor)

    2016-01-01

    A multi-purpose, cylindrical thermal insulation test apparatus is used for testing insulation materials and systems of materials using a liquid boil-off calorimeter system for absolute measurement of the effective thermal conductivity (k-value) and heat flux of a specimen material at a fixed environmental condition (cold-side temperature, warm-side temperature, vacuum pressure level, and residual gas composition). An inner vessel receives liquid with a normal boiling point below ambient temperature, such as liquid nitrogen, enclosed within a vacuum chamber. A cold mass assembly, including upper and lower guard chambers and middle test vessel, is suspended from a lid of the vacuum canister. Each of the three chambers is filled and vented through a single feedthrough. All fluid and instrumentation feedthroughs are mounted and suspended from a top domed lid allowing easy removal of the cold mass. A lift mechanism allows manipulation of the cold mass assembly and insulation test article.

  2. 40 CFR 63.118 - Process vent provisions-periodic reporting and recordkeeping requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... device or other means to achieve and maintain a TRE index value greater than 1.0 but less than 4.0 as... subpart and who elects to demonstrate compliance with the TRE index value greater than 4.0 under § 63.113... § 63.115(e) of this subpart, is made that causes a Group 2 process vent with a TRE greater than 4.0 to...

  3. 40 CFR 63.118 - Process vent provisions-periodic reporting and recordkeeping requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... device or other means to achieve and maintain a TRE index value greater than 1.0 but less than 4.0 as... subpart and who elects to demonstrate compliance with the TRE index value greater than 4.0 under § 63.113... § 63.115(e) of this subpart, is made that causes a Group 2 process vent with a TRE greater than 4.0 to...

  4. Microdistribution of Faunal Assemblages at Deep-Sea Hydrothermal Vents in the Southern Ocean

    PubMed Central

    Marsh, Leigh; Copley, Jonathan T.; Huvenne, Veerle A. I.; Linse, Katrin; Reid, William D. K.; Rogers, Alex D.; Sweeting, Christopher J.; Tyler, Paul A.

    2012-01-01

    Chemosynthetic primary production by microbes supports abundant faunal assemblages at deep-sea hydrothermal vents, with zonation of invertebrate species typically occurring along physico-chemical gradients. Recently discovered vent fields on the East Scotia Ridge (ESR) in the Southern Ocean represent a new province of vent biogeography, but the spatial dynamics of their distinct fauna have yet to be elucidated. This study determines patterns of faunal zonation, species associations, and relationships between faunal microdistribution and hydrothermal activity in a vent field at a depth of 2,400 m on the ESR. Remotely operated vehicle (ROV) dives obtained high-definition imagery of three chimney structures with varying levels of hydrothermal activity, and a mosaic image of >250 m2 of seafloor co-registered with temperature measurements. Analysis of faunal microdistribution within the mosaiced seafloor reveals a consistent pattern of faunal zonation with increasing distance from vent sources and peak temperatures. Assemblages closest to vent sources are visibly dominated by a new species of anomuran crab, Kiwa n. sp. (abundance >700 individuals m−2), followed by a peltospiroid gastropod (>1,500 individuals m−2), eolepadid barnacle (>1,500 individuals m−2), and carnivorous actinostolid anemone (>30 individuals m−2). Peripheral fauna are not dominated by a single taxon, but include predatory and scavenger taxa such as stichasterid seastars, pycnogonids and octopus. Variation in faunal microdistribution on chimneys with differing levels of activity suggests a possible successional sequence for vent fauna in this new biogeographic province. An increase in δ34S values of primary consumers with distance from vent sources, and variation in their δ13C values also indicate possible zonation of nutritional modes of the vent fauna. By using ROV videography to obtain a high-resolution representation of a vent environment over a greater extent than previous studies, these results provide a baseline for determining temporal change and investigations of processes structuring faunal assemblages at Southern Ocean vents. PMID:23144754

  5. 40 CFR 63.116 - Process vent provisions-performance test methods and procedures to determine compliance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reduce the vent stream halogen atom mass emission rate to less than 0.45 kilogram per hour prior to a combustion control device in compliance with § 63.113(c)(2) of this subpart shall determine the halogen atom...

  6. 40 CFR 63.116 - Process vent provisions-performance test methods and procedures to determine compliance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reduce the vent stream halogen atom mass emission rate to less than 0.45 kilogram per hour prior to a combustion control device in compliance with § 63.113(c)(2) of this subpart shall determine the halogen atom...

  7. 40 CFR 63.116 - Process vent provisions-performance test methods and procedures to determine compliance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... reduce the vent stream halogen atom mass emission rate to less than 0.45 kilogram per hour prior to a combustion control device in compliance with § 63.113(c)(2) of this subpart shall determine the halogen atom...

  8. 40 CFR 63.116 - Process vent provisions-performance test methods and procedures to determine compliance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... reduce the vent stream halogen atom mass emission rate to less than 0.45 kilogram per hour prior to a combustion control device in compliance with § 63.113(c)(2) of this subpart shall determine the halogen atom...

  9. 78 FR 69337 - Greenhouse Gas Reporting Program: Amendments and Confidentiality Determinations for Fluorinated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ... Classification System NF 3 nitrogen trifluoride NODA notice of data availability NTTAA National Technology... Previously Produced Fluorinated GHGs and From Venting of Residual Fluorinated GHGs From Containers 7... emissions from production and transformation processes; emissions from venting of container heels and...

  10. A sheet metal forming simulation of automotive outer panels considering the behavior of air in die cavity

    NASA Astrophysics Data System (ADS)

    Choi, Kwang Yong; Kim, Yun Chang; Choi, Hee Kwan; Kang, Chul Ho; Kim, Heon Young

    2013-12-01

    During a sheet metal forming process of automotive outer panels, the air trapped between a blank sheet and a die tool can become highly compressed, ultimately influencing the blank deformation and the press force. To prevent this problem, vent holes are drilled into die tools and needs several tens to hundreds according to the model size. The design and the drilling of vent holes are based on expert's experience and try-out result and thus the process can be one of reasons increasing development cycle. Therefore the study on the size, the number, and the position of vent holes is demanded for reducing development cycle, but there is no simulation technology for analyzing forming defects, making numerical sheet metal forming process simulations that incorporate the fluid dynamics of air. This study presents a sheet metal forming simulation of automotive outer panels (a roof and a body side outer) that simultaneously simulates the behavior of air in a die cavity. Through CAE results, the effect of air behavior and vent holes to blank deformation was analyzed. For this study, the commercial software PAM-STAMP{trade mark, serif} and PAM-SAFE{trade mark, serif} was used.

  11. Microbial community structure of hydrothermal deposits from geochemically different vent fields along the Mid-Atlantic Ridge

    USGS Publications Warehouse

    Flores, Gilberto E.; Campbell, James H.; Kirshtein, Julie D.; Meneghin, Jennifer; Podar, Mircea; Steinberg, Joshua I.; Seewald, Jeffrey S.; Tivey, Margaret Kingston; Voytek, Mary A.; Yang, Zamin K.; Reysenbach, Anna-Louise

    2011-01-01

    To evaluate the effects of local fluid geochemistry on microbial communities associated with active hydrothermal vent deposits, we examined the archaeal and bacterial communities of 12 samples collected from two very different vent fields: the basalt-hosted Lucky Strike (37°17'N, 32°16.3'W, depth 1600-1750m) and the ultramafic-hosted Rainbow (36°13'N, 33°54.1'W, depth 2270-2330m) vent fields along the Mid-Atlantic Ridge (MAR). Using multiplexed barcoded pyrosequencing of the variable region 4 (V4) of the 16S rRNA genes, we show statistically significant differences between the archaeal and bacterial communities associated with the different vent fields. Quantitative polymerase chain reaction (qPCR) assays of the functional gene diagnostic for methanogenesis (mcrA), as well as geochemical modelling to predict pore fluid chemistries within the deposits, support the pyrosequencing observations. Collectively, these results show that the less reduced, hydrogen-poor fluids at Lucky Strike limit colonization by strict anaerobes such as methanogens, and allow for hyperthermophilic microaerophiles, like Aeropyrum. In contrast, the hydrogen-rich reducing vent fluids at the ultramafic-influenced Rainbow vent field support the prevalence of methanogens and other hydrogen-oxidizing thermophiles at this site. These results demonstrate that biogeographical patterns of hydrothermal vent microorganisms are shaped in part by large scale geological and geochemical processes.

  12. Faunal composition and organic surface encrustations at hydrothermal vents on the southern Juan De Fuca Ridge

    NASA Astrophysics Data System (ADS)

    Tunnicliffe, Verena; Fontaine, A. R.

    1987-10-01

    Examination of a small collection of macroinvertebrates from three vents of the southern Juan de Fuca vent field reveals differences between the vents with respect to species composition, species habits, and microbial and metallic deposits on their surfaces. TWo apparently new vestimentiferan species were found, and for the first time the Juan de Fuca palm worm was observed to dwell on smokers. High acidity values recorded in this system may interfere with the process of shell calcification in an archaeogastropod snail. The surfaces of vestimentifer an tubes at two vents are heavily encrusted with microbial and metallic accumulations. Scanning electron microscope, transmission electron microscope, and energy dispersive X ray microanalysis observations show that iron-based crusts on orange tubes are built from accumulations of an Fe-rich particle of distinctive size and shape. Morphological evidence is presented for the microbial origin of Fe-rich particles. Zn-rich particles found on black tubes are not of microbial origin. We suggest that iron deposition on surfaces in the vent environment is initially biocatalytic but subsequent deposits may build by simple inorganic reactions.

  13. 75 FR 65032 - Notice of Lodging of Consent Decree

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-21

    ... absorber vent as a Group 2 process vent under the Hazardous Organic NESHAP regulations. For three years, Westlake will also implement an enhanced Leak Detection and Repair program to control emissions of...'s common control, and Westlake will not contest administratively or judicially a finding by the...

  14. 40 CFR 63.1259 - Recordkeeping requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... required by § 63.1253(f)(2) and the pressure relief vent setting and the leak detection records specified... human health or the environment than if the storage tanks and process vents were controlled according to... guidance that the Administrator makes available for use or any other technically sound information or...

  15. 40 CFR 65.163 - Other records.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams... FEDERAL AIR RULE Closed Vent Systems, Control Devices, and Routing to a Fuel Gas System or a Process § 65... bypass lines that could divert a vent stream away from the control device and to the atmosphere, the...

  16. 40 CFR 98.127 - Records that must be retained.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... destruction device, a facility may track dates and time periods that process vents by-pass the destruction... in your GHG Monitoring Plan. (g) Container heel records. If you vent residual fluorinated GHGs from containers, maintain the following records of the measurements and calculations used to estimate emissions of...

  17. 40 CFR 98.127 - Records that must be retained.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... destruction device, a facility may track dates and time periods that process vents by-pass the destruction... in your GHG Monitoring Plan. (g) Container heel records. If you vent residual fluorinated GHGs from containers, maintain the following records of the measurements and calculations used to estimate emissions of...

  18. 40 CFR 98.127 - Records that must be retained.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... destruction device, a facility may track dates and time periods that process vents by-pass the destruction... in your GHG Monitoring Plan. (g) Container heel records. If you vent residual fluorinated GHGs from containers, maintain the following records of the measurements and calculations used to estimate emissions of...

  19. 40 CFR 98.127 - Records that must be retained.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... destruction device, a facility may track dates and time periods that process vents by-pass the destruction... in your GHG Monitoring Plan. (g) Container heel records. If you vent residual fluorinated GHGs from containers, maintain the following records of the measurements and calculations used to estimate emissions of...

  20. The vent microbiome: patterns and drivers

    NASA Astrophysics Data System (ADS)

    Pachiadaki, M.

    2015-12-01

    Microbial processes within deep-sea hydrothermal vents affect the global biogeochemical cycles. Still, there are significant gaps in our understanding of the microbiology and the biogeochemistry of deep-sea hydrothermal systems. Vents differ in temperature, host rock composition and fluid chemistry; factors that are hypothesized to shape the distribution of the microbial communities, their metabolic capabilities and their activities. Using large-scale single cell genomics, we obtained insights into the genomic content of several linkages of a diffuse flow vent. The genomes show high metabolic versatility. Sulfur oxidation appears to be predominant but there is the potential of using a variety of e- donors and acceptors to obtain energy. To further assess the ecological importance of the vent auto- and heterotrophs, the global biogeography of the analyzed lineages will be investigated by fragment recruitment of metagenomes produced from the same site as well as other hydrothermal systems. Metatranscriptomic and metaproteomic data will be integrated to examine the expression of the predominant metabolic pathways and thus the main energy sources driving chemoautotrophic production. The comparative analysis of the key players and associated pathways among various vent sites that differ in physicochemical characteristics is anticipated to decipher the patterns and drivers of the global dispersion and the local diversification of the vent microbiome.

  1. Distribution and chemistry of suspended particles from an active hydrothermal vent site on the Mid-Atlantic Ridge at 26°N

    NASA Astrophysics Data System (ADS)

    Trocine, Robert P.; Trefry, John H.

    1988-04-01

    Suspended particles were collected from an area of active hydrothermal venting at the Trans-Atlantic Geotraverse (TAG) Hydrothermal Field on the Mid-Atlantic Ridge and analyzed for Fe, Mn, Cd, Zn, Cu, V, Ni, Cr, Pb, Mg, Ca, Al and Si. Rapid advection of vent-derived precipitates produced a lens with total suspended matter (TSM) loadings of 14-60 μg/l at 200-700 m above the seafloor; TSM concentrations > 60 μg/l were observed only at near-vent sites. The distribution of suspended particles correlated well with increased dissolved Mn concentrations and particulate Fe values near the vent source. Particulate Fe values decreased linearly relative to TSM concentrations as hydrothermal precipitates mixed with background suspended matter. Near-vent precipitates were characterized by up to 35% Fe, 2% Zn, 0.6% Cu and > 100 μg/g Cd. In comparison to Fe, particulate Cd, Zn and Cu values decreased dramatically away from the vent source. This trend supports differential settling and/or dissolution of Cd-, Zn- and Cu-bearing phases. Particulate Mn and Fe values were inversely related with only 50 μg Mn/g in the near-vent particles. At near-vent sites, > 99% of the total Mn was in solution; this fraction decreased to 75-80% at background TSM values. In contrast to Cd, Zn and Cu, particulate V levels show a continuous, linear decrease with particulate Fe values. This trend is explained by adsorption of V on Fe-oxides in the vent plume. Scavenging of Cr, Pb and Mg by hydrothermal precipitates is also suggested by the data. Nickel and Al values were low in near-vent particles at < 100 and < 3 μg/g, respectively. The complementary behavior of dissolved Mn and particulate trace metals provides a useful framework for studying broad aspects of hydrothermal plume processes.

  2. Cleaning residual NaK in the fast flux test facility fuel storage cooling system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burke, T.M.; Church, W.R.; Hodgson, K.M.

    2008-01-15

    The Fast Flux Test Facility (FFTF), located on the U.S. Department of Energy's Hanford Reservation, is a liquid metal-cooled test reactor. The FFTF was constructed to support the U.S. Liquid Metal Fast Breeder Reactor Program. The bulk of the alkali metal (sodium and NaK) has been drained and will be stored onsite prior to final disposition. Residual NaK needed to be removed from the pipes, pumps, heat exchangers, tanks, and vessels in the Fuel Storage Facility (FSF) cooling system. The cooling system was drained in 2004 leaving residual NaK in the pipes and equipment. The estimated residual NaK volume wasmore » 76 liters in the storage tank, 1.9 liters in the expansion tank, and 19-39 liters in the heat transfer loop. The residual NaK volume in the remainder of the system was expected to be very small, consisting of films, droplets, and very small pools. The NaK in the FSF Cooling System was not radiologically contaminated. The portions of the cooling system to be cleaned were divided into four groups: 1. The storage tank, filter, pump, and associated piping; 2. The heat exchanger, expansion tank, and associated piping; 3. Argon supply piping; 4. In-vessel heat transfer loop. The cleaning was contracted to Creative Engineers, Inc. (CEI) and they used their superheated steam process to clean the cooling system. It has been concluded that during the modification activities (prior to CEI coming onsite) to prepare the NaK Cooling System for cleaning, tank T-914 was pressurized relative to the In-Vessel NaK Cooler and NaK was pushed from the tank back into the Cooler and that on November 6, 2005, when the gas purge through the In-Vessel NaK Cooler was increased from 141.6 slm to 283.2 slm, NaK was forced from the In-Vessel NaK Cooler and it contacted water in the vent line and/or scrubber. The gases from the reaction then traveled back through the vent line coating the internal surface of the vent line with NaK and NaK reaction products. The hot gases also exited the scrubber through the stack and due to the temperature of the gas, the hydrogen auto ignited when it mixed with the oxygen in the air. There was no damage to equipment, no injuries, and no significant release of hazardous material. Even though the FSF Cooling System is the only system at FFTF that contains residual NaK, there are lessons to be learned from this event that can be applied to future residual sodium removal activities. The lessons learned are: - Before cleaning equipment containing residual alkali metal the volume of alkali metal in the equipment should be minimized to the extent practical. As much as possible, reconfirm the amount and location of the alkali metal immediately prior to cleaning, especially if additional evolutions have been performed or significant time has passed. This is especially true for small diameter pipe (<20.3 centimeters diameter) that is being cleaned in place since gas flow is more likely to move the alkali metal. Potential confirmation methods could include visual inspection (difficult in all-metal systems), nondestructive examination (e.g., ultrasonic measurements) and repeating previous evolutions used to drain the system. Also, expect to find alkali metal in places it would not reasonably be expected to be. - Staff with an intimate knowledge of the plant equipment and the bulk alkali metal draining activities is critical to being able to confirm the amount and locations of the alkali metal residuals and to safely clean the residuals. - Minimize the potential for movement of alkali metal during cleaning or limit the distance and locations into which alkali metal can move. - Recognize that when working with alkali metal reactions, occasional pops and bangs are to be anticipated. - Pre-plan emergency responses to unplanned events to assure responses planned for an operating reactor are appropriate for the deactivation phase.« less

  3. 46 CFR 154.519 - Piping relief valves.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Process Piping Systems § 154.519 Piping relief valves. (a) The liquid relief valve that protects the cargo piping system from liquid pressure exceeding the design pressure must discharge into: (1) A cargo tank; or (2) A cargo vent mast if that vent mast has a means for the detection and removal of the liquid...

  4. 46 CFR 154.519 - Piping relief valves.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Process Piping Systems § 154.519 Piping relief valves. (a) The liquid relief valve that protects the cargo piping system from liquid pressure exceeding the design pressure must discharge into: (1) A cargo tank; or (2) A cargo vent mast if that vent mast has a means for the detection and removal of the liquid...

  5. 46 CFR 154.519 - Piping relief valves.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Process Piping Systems § 154.519 Piping relief valves. (a) The liquid relief valve that protects the cargo piping system from liquid pressure exceeding the design pressure must discharge into: (1) A cargo tank; or (2) A cargo vent mast if that vent mast has a means for the detection and removal of the liquid...

  6. 46 CFR 154.519 - Piping relief valves.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Process Piping Systems § 154.519 Piping relief valves. (a) The liquid relief valve that protects the cargo piping system from liquid pressure exceeding the design pressure must discharge into: (1) A cargo tank; or (2) A cargo vent mast if that vent mast has a means for the detection and removal of the liquid...

  7. 40 CFR 65.150 - Absorbers used as control devices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... control device on a Group 1 process vent or a high-throughput transfer rack with an absorber used as a... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Absorbers used as control devices. 65... (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Closed Vent Systems, Control Devices, and Routing to a Fuel Gas...

  8. 40 CFR 65.150 - Absorbers used as control devices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... control device on a Group 1 process vent or a high-throughput transfer rack with an absorber used as a... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Absorbers used as control devices. 65... (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Closed Vent Systems, Control Devices, and Routing to a Fuel Gas...

  9. 40 CFR 65.150 - Absorbers used as control devices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control device on a Group 1 process vent or a high-throughput transfer rack with an absorber used as a... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Absorbers used as control devices. 65... (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Closed Vent Systems, Control Devices, and Routing to a Fuel Gas...

  10. 40 CFR 65.152 - Carbon adsorbers used as control devices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control device. If an owner or operator elects to replace a control device on a Group 1 process vent or... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Carbon adsorbers used as control... PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Closed Vent Systems, Control Devices, and Routing to a...

  11. Ash production and dispersal from sustained low-intensity Mono-Inyo eruptions

    NASA Astrophysics Data System (ADS)

    Black, Benjamin A.; Manga, Michael; Andrews, Benjamin

    2016-08-01

    Recent rhyolitic volcanism has demonstrated that prolonged low-intensity ash venting may accompany effusive dome formation. We examine the possibility and some consequences of episodes of extended, weak ash venting at the rhyolitic Mono-Inyo chain in Eastern California. We describe ash-filled cracks within one of the youngest domes, Panum Crater, which provide a textural record of ash venting during dome effusion. We use synchrotron-based X-ray computed tomography to characterize the particles in these tuffisites. Particle sizes in well-sorted tuffisite layers agree well with grain size distributions observed during weak ash venting at Soufrière Hills Volcano, Montserrat, and yield approximate upper and lower bounds on gas velocity and mass flux during the formation of those layers. We simulate ash dispersal with Ash3d to assess the consequences of long-lived Mono-Inyo ash venting for ash deposition and the accompanying volcanic hazards. Our results highlight the sensitivity of large-scale outcomes of volcanic eruptions to small-scale processes.

  12. Measure Guideline: Passive Vents

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berger, David; Neri, Robin

    2016-02-05

    This document addresses the use of passive vents as a source of outdoor air in multifamily buildings. The challenges associated with implementing passive vents and the factors affecting performance are outlined. A comprehensive design methodology and quantified performance metrics are provided. Two hypothetical design examples are provided to illustrate the process. This document is intended to be useful to designers, decision-makers, and contractors implementing passive ventilation strategies. It is also intended to be a resource for those responsible for setting high-performance building program requirements, especially pertaining to ventilation and outdoor air. To ensure good indoor air quality, a dedicated sourcemore » of outdoor air is an integral part of high-performance buildings. Presently, there is a lack of guidance pertaining to the design and installation of passive vents, resulting in poor system performance. This report details the criteria necessary for designing, constructing, and testing passive vent systems to enable them to provide consistent and reliable levels of ventilation air from outdoors.« less

  13. Heterotrophic Proteobacteria in the vicinity of diffuse hydrothermal venting.

    PubMed

    Meier, Dimitri V; Bach, Wolfgang; Girguis, Peter R; Gruber-Vodicka, Harald R; Reeves, Eoghan P; Richter, Michael; Vidoudez, Charles; Amann, Rudolf; Meyerdierks, Anke

    2016-12-01

    Deep-sea hydrothermal vents are highly dynamic habitats characterized by steep temperature and chemical gradients. The oxidation of reduced compounds dissolved in the venting fluids fuels primary production providing the basis for extensive life. Until recently studies of microbial vent communities have focused primarily on chemolithoautotrophic organisms. In our study, we targeted the change of microbial community compositions along mixing gradients, focusing on distribution and capabilities of heterotrophic microorganisms. Samples were retrieved from different venting areas within the Menez Gwen hydrothermal field, taken along mixing gradients, including diffuse fluid discharge points, their immediate surroundings and the buoyant parts of hydrothermal plumes. High throughput 16S rRNA gene amplicon sequencing, fluorescence in situ hybridization, and targeted metagenome analysis were combined with geochemical analyses. Close to diffuse venting orifices dominated by chemolithoautotrophic Epsilonproteobacteria, in areas where environmental conditions still supported chemolithoautotrophic processes, we detected microbial communities enriched for versatile heterotrophic Alpha- and Gammaproteobacteria. The potential for alkane degradation could be shown for several genera and yet uncultured clades. We propose that hotspots of chemolithoautotrophic life support a 'belt' of heterotrophic bacteria significantly different from the dominating oligotrophic microbiota of the deep sea. © 2016 Society for Applied Microbiology and John Wiley & Sons Ltd.

  14. Stratigraphic architecture of hydromagmatic volcanoes that have undergone vent migration: a review of Korean case studies

    NASA Astrophysics Data System (ADS)

    Sohn, Y.

    2011-12-01

    Recent studies show that the architecture of hydromagmatic volcanoes is far more complex than formerly expected. A number of external factors, such as paleohydrology and tectonics, in addition to magmatic processes are thought to play a role in controlling the overall characteristics and architecture of these volcanoes. One of the main consequences of these controls is the migration of the active vent during eruption. Case studies of hydromagmatic volcanoes in Korea show that those volcanoes that have undergone vent migration are characterized by superposition or juxtaposition of multiple rim deposits of partial tuff rings and/or tuff cones that have contrasting lithofacies characteristics, bed attitudes, and paleoflow directions. Various causes of vent migration are inferred from these volcanoes. Large-scale collapse of fragile substrate is interpreted to have caused vent migration in the Early Pleistocene volcanoes of Jeju Island, which were built upon still unconsolidated continental shelf sediments. Late Pleistocene to Holocene volcanoes, which were built upon a stack of rigid, shield-forming lava flows, lack features due to large-scale substrate collapse and have generally simple and circular morphologies either of a tuff ring or of a tuff cone. However, ~600 m shift of the eruptive center is inferred from one of these volcanoes (Ilchulbong tuff cone). The vent migration in this volcano is interpreted to have occurred because the eruption was sourced by multiple magma batches with significant eruptive pauses in between. The Yangpori diatreme in a Miocene terrestrial half-graben basin in SE Korea is interpreted to be a subsurface equivalent of a hydromagmatic volcano that has undergone vent migration. The vent migration here is inferred to have had both vertical and lateral components and have been caused by an abrupt tectonic activity near the basin margin. In all these cases, rimbeds or diatreme fills derived from different source vents are bounded by either prominent or subtle, commonly laterally extensive truncation surfaces or stratigraphic discontinuities. Careful documentation of these surfaces and discontinuities thus appears vital to proper interpretation of eruption history, morphologic evolution, and even deep-seated magmatic processes of a hydromagmatic volcano. In this respect, the technique known as 'allostratigraphy' appears useful in mapping, correlation, and interpretation of many hydrovolcanic edifices and sequences.

  15. Video monitoring reveals pulsating vents and propagation path of fissure eruption during the March 2011 Pu'u 'Ō'ō eruption, Kilauea volcano

    NASA Astrophysics Data System (ADS)

    Witt, Tanja; Walter, Thomas R.

    2017-01-01

    Lava fountains are a common eruptive feature of basaltic volcanoes. Many lava fountains result from fissure eruptions and are associated with the alignment of active vents and rising gas bubbles in the conduit. Visual reports suggest that lava fountain pulses may occur in chorus at adjacent vents. The mechanisms behind such a chorus of lava fountains and the underlying processes are, however, not fully understood. The March 2011 eruption at Pu'u 'Ō'ō (Kilauea volcano) was an exceptional fissure eruption that was well monitored and could be closely approached by field geologists. The fissure eruption occurred along groups of individual vents aligned above the feeding dyke. We investigate video data acquired during the early stages of the eruption to measure the height, width and velocity of the ejecta leaving eight vents. Using a Sobel edge-detection algorithm, the activity level of the lava fountains at the vents was determined, revealing a similarity in the eruption height and frequency. Based on this lava fountain time series, we estimate the direction and degree of correlation between the different vents. We find that the height and velocity of the eruptions display a small but systematic shift in time along the vents, indicating a lateral migration of lava fountaining at a rate of 11 m/s from W to E. This finding is in agreement with a propagation model of a pressure wave originating at the Kilauea volcano and propagating through the dyke at 10 m/s from W to E. Based on this approach from videos only 30 s long, we are able to obtain indirect constraints on the physical dyke parameters, with important implications for lateral magma flow processes at depth. This work shows that the recording and analysis of video data provide important constraints on the mechanisms of lava fountain pulses. Even though the video sequence is short, it allows for the confirmation of the magma propagation direction and a first-order estimation of the dyke dimensions.

  16. Volcanic Lightning, Pyroclastic Density Currents, Ballistic Fall, Vent Tremor, and One Very Loud Blast: Acoustic Analysis of the 14 July 2013 Vulcanian Eruption at Tungurahua, Ecuador.

    NASA Astrophysics Data System (ADS)

    Anderson, J.; Johnson, J. B.; Steele, A. L.; Anzieta, J. C.; Ortiz, H. D.; Hall, M. L.; Ruiz, M. C.

    2014-12-01

    Acoustic recordings reveal a variety of volcanic activities during an exceptionally loud vulcanian eruption at Tungurahua. A period of several months of mild surface activity came to an abrupt end with the emission of a powerful blast wave heard at least 180 km away. Sensors 2080 m from the vent recorded a stepped rise to its maximum overpressure of 1220 Pa (corresponding to a sound pressure level of 156 dB) and its unusually long dominant period of 5.6 s. We discuss source processes that produced the blast wave, considering that wave propagation could be nonlinear near the vent because of high overpressures. More than an hour of acoustic activity was recorded after the blast wave, including sound from falling ballistics, reflections of the blast wave from nearby mountains, pyroclastic density currents, and acoustic tremor at the vent. Glitches in the acoustic records related to plume lightning were also serendipitously observed, although thunder could not be unambiguously identified. We discuss acoustic signatures of falling ballistics and pyroclastic density currents and how array-style deployments and analytic methods can be used to reveal them. Placement of sensors high on the volcano's slopes facilitated resolving these distinct processes. This study demonstrates that near-vent, array-style acoustic installations can be used to monitor various types of volcanic activity.

  17. Development and relationship of monogenetic and polygenetic volcanic fields in time and space.

    NASA Astrophysics Data System (ADS)

    Germa, Aurelie; Connor, Chuck; Connor, Laura; Malservisi, Rocco

    2013-04-01

    The classification of volcanic systems, developed by G. P. L. Walker and colleagues, relates volcano morphology to magma transport and eruption processes. In general, distributed monogenetic volcanic fields are characterized by infrequent eruptions, low average output rate, and a low spatial intensity of the eruptive vents. In contrast, central-vent-dominated systems, such as stratovolcanoes, central volcanoes and lava shields are characterized by frequent eruptions, higher average flux rates, and higher spatial intensity of eruptive vents. However, it has been observed that a stratovolcano is often associated to parasitic monogenetic vents on its flanks, related to the central silicic systems, and surrounded by an apron of monogenetic edifices that are part of the volcanic field but independent from the principal central system. It appears from spatial distribution and time-volume relationships that surface area of monogenetic fields reflects the lateral extent of the magma source region and the lack of magma focusing mechanisms. In contrast, magma is focused through a unique conduit system for polygenetic volcanoes, provided by a thermally and mechanically favorable pathway toward the surface that is maintained by frequent and favorable stress conditions. We plan to relate surface observations of spatio-temporal location of eruptive vents and evolution of the field area through time to processes that control magma focusing during ascent and storage in the crust. We choose to study fields that range from dispersed to central-vent dominated, through transitional fields (central felsic system with peripheral field of monogenetic vents independent from the rhyolitic system). We investigate different well-studied volcanic fields in the Western US and Western Europe in order to assess influence of the geodynamic setting and tectonic stress on the spatial distribution of magmatism. In summary, incremental spatial intensity maps should reveal how fast a central conduit is created during the development of a volcanic field, and how this could influence the outbreak of dispersed monogenetic volcanoes that are not geochemically linked to the central system.

  18. 9 CFR 381.305 - Equipment and procedures for heat processing systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... plates. Whenever one or more divider plates are used between any two layers of containers or placed on... from several still retorts shall lead to the atmosphere. The manifold header shall not be controlled by...) Venting through multiple 1 inch (2.5 cm) vents discharging directly to the atmosphere. EC11SE91.047...

  19. 9 CFR 381.305 - Equipment and procedures for heat processing systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... plates. Whenever one or more divider plates are used between any two layers of containers or placed on... from several still retorts shall lead to the atmosphere. The manifold header shall not be controlled by...) Venting through multiple 1 inch (2.5 cm) vents discharging directly to the atmosphere. EC11SE91.047...

  20. 9 CFR 381.305 - Equipment and procedures for heat processing systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... plates. Whenever one or more divider plates are used between any two layers of containers or placed on... from several still retorts shall lead to the atmosphere. The manifold header shall not be controlled by...) Venting through multiple 1 inch (2.5 cm) vents discharging directly to the atmosphere. EC11SE91.047...

  1. 40 CFR 63.116 - Process vent provisions-performance test methods and procedures to determine compliance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... conduct a performance test to determine percent emission reduction or outlet organic HAP or TOC... organic HAP concentration and percent reduction may be measured as either total organic HAP or as TOC... measurement of total organic HAP or TOC (minus methane and ethane) concentrations in all vent streams and...

  2. 40 CFR 60.611 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... recovery device or series of such devices applied to the same process stream. Total organic compounds (TOC...(d)(5) and § 60.614(e) and TOC concentration as required in § 60.615(b)(4) and § 60.615(g)(4), those... requirement per unit reduction of TOC associated with an individual air oxidation vent stream, based on vent...

  3. 40 CFR Table 5 of Subpart Bbbbbbb... - Reporting Requirements

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... vent streams from equipment in target HAP service to a PM control device with a PM percent reduction efficiency of 95 percent (98 percent for new sources) or an outlet concentration of 0.03 gr/dscf or less a... requirement to route all process vent streams from equipment in target HAP service to a PM control device that...

  4. 40 CFR Table 5 of Subpart Bbbbbbb... - Reporting Requirements

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... vent streams from equipment in target HAP service to a PM control device with a PM percent reduction efficiency of 95 percent (98 percent for new sources) or an outlet concentration of 0.03 gr/dscf or less a... requirement to route all process vent streams from equipment in target HAP service to a PM control device that...

  5. 40 CFR Table 5 of Subpart Bbbbbbb... - Reporting Requirements

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... vent streams from equipment in target HAP service to a PM control device with a PM percent reduction efficiency of 95 percent (98 percent for new sources) or an outlet concentration of 0.03 gr/dscf or less a... requirement to route all process vent streams from equipment in target HAP service to a PM control device that...

  6. 40 CFR Table 5 of Subpart Bbbbbbb... - Reporting Requirements

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... vent streams from equipment in target HAP service to a PM control device with a PM percent reduction efficiency of 95 percent (98 percent for new sources) or an outlet concentration of 0.03 gr/dscf or less a... requirement to route all process vent streams from equipment in target HAP service to a PM control device that...

  7. 40 CFR Table 5 of Subpart Bbbbbbb... - Reporting Requirements

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... vent streams from equipment in target HAP service to a PM control device with a PM percent reduction efficiency of 95 percent (98 percent for new sources) or an outlet concentration of 0.03 gr/dscf or less a... requirement to route all process vent streams from equipment in target HAP service to a PM control device that...

  8. 40 CFR 63.1426 - Process vent requirements for determining organic HAP concentration, control efficiency, and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... performance test for those control techniques in accordance with paragraph (b)(6) of this section. The design..., immediately preceding the use of the control technique. A design evaluation shall also address other vent... paragraph (f)(1)(i) of this section, the design evaluation shall document the control efficiency and address...

  9. Identification of possible recent water/lava source vents in the Cerberus plains: Stratigraphic andcrater count age constraints

    NASA Astrophysics Data System (ADS)

    Thomas, Rebecca J.

    2013-04-01

    In order to investigate sources of lava and water to the Cerberus plains of Mars, geomorphological mapping on High Resolution Imaging Science Experiment (HiRISE) images was carried out to reveal the history of activity of fissures and pits which lie upstream of channels and deposits associated with a wrinkle ridge near Cerberus Fossae. The fissures and pits are superbly exposed and imaged, and flows and channels emanate directly from them, interpreted as clear evidence that these are vents. The mapping establishes stratigraphic relationships between the plains and the channels and deposits originating from the vents, establishing the vent history. For example, to the south of the wrinkle ridge, both incised channels and leveed flows extend onto the southern plain and are clearly the final phase of plains-forming activity. Conversely, to the north, vent-sourced channels only incise the plain close to the ridge—beyond that, they are overlain by large-scale regional flows that appear to have originated from the direction of Athabasca Valles. In the southeast, there is evidence of contemporaneity between vent-sourced activity and large-scale plains-forming flow that was not sourced from the vents, indicating that activity here was part of a broader process of Cerberus plains formation from multiple sources. Crater counts show all the activity to be Late Amazonian, with the latest activity tentatively dating to circa 11 Ma. Thus, this study implies that very recent outflows from these vents contributed to the formation of the Cerberus plains and constrains the timing and local flow direction of plains-forming deposits from other sources.

  10. Radioactive Air Emissions Notice of Construction for the 105-KW Basin integrated water treatment system filter vessel sparging vent

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kamberg, L.D.

    1998-02-23

    This document serves as a notice of construction (NOC), pursuant to the requirements of Washington Administrative Code (WAC) 246-247-060, and as a request for approval to construct, pursuant to 40 Code of Federal Regulations (CFR) 61.07, for the Integrated Water Treatment System (IWTS) Filter Vessel Sparging Vent at 105-KW Basin. Additionally, the following description, and references are provided as the notices of startup, pursuant to 40 CFR 61.09(a)(1) and (2) in accordance with Title 40 Code of Federal Regulations, Part 61, National Emission Standards for Hazardous Air Pollutants. The 105-K West Reactor and its associated spent nuclear fuel (SNF) storagemore » basin were constructed in the early 1950s and are located on the Hanford Site in the 100-K Area about 1,400 feet from the Columbia River. The 105-KW Basin contains 964 Metric Tons of SNF stored under water in approximately 3,800 closed canisters. This SNF has been stored for varying periods of time ranging from 8 to 17 years. The 105-KW Basin is constructed of concrete with an epoxy coating and contains approximately 1.3 million gallons of water with an asphaltic membrane beneath the pool. The IWTS, which has been described in the Radioactive Air Emissions NOC for Fuel Removal for 105-KW Basin (DOE/RL-97-28 and page changes per US Department of Energy, Richland Operations Office letter 97-EAP-814) will be used to remove radionuclides from the basin water during fuel removal operations. The purpose of the modification described herein is to provide operational flexibility for the IWTS at the 105-KW basin. The proposed modification is scheduled to begin in calendar year 1998.« less

  11. Comparing chemolithoautotrophic subseafloor communities across geochemical gradients using meta-omics and RNA-SIP

    NASA Astrophysics Data System (ADS)

    Fortunato, C. S.; Huber, J. A.

    2015-12-01

    The chemolithoautotrophic microbial community of the rocky subseafloor potentially provides a large amount of organic carbon to the deep ocean, yet our understanding of the activity and metabolic complexity of subseafloor organisms remains poorly described. Past studies have shown that the taxonomic structure of subseafloor communities differs based on the geochemical signatures of individual vents. In this study, we expanded beyond phylogeny and used a combination of metagenomic, metatranscriptomic, and RNA-based stable isotope probing (RNA-SIP) analyses to identify the metabolic potential, expression patterns, and the active autotrophic players and genomic pathways present in venting fluids from Axial Seamount, an active submarine volcano off the coast of Oregon, USA. Low-temperature diffuse vent fluids from three hydrothermal vents, Marker 113, Marker 33, and Anemone, were filtered and preserved on the seafloor for metagenome and metatranscriptome analyses. Fluid for RNA-SIP was also collected and incubated shipboard with 13C-labeled sodium bicarbonate at 30ºC, 55ºC, and 80ºC for each vent. Taxonomically, Epsilonproteobacteria comprised a significant proportion of the community at all three vents, but each vent also had distinct groups that were abundant including SUP05 at Anemone and Methanococcus at Marker 113. Functionally, vents shared many metabolic processes including genes for denitrification, sulfur reduction and sulfur, hydrogen, and ammonium oxidation, which were present and expressed in similar abundance across all three vents. One metabolic difference between vents was the presence and expression of genes for methanogenesis, which were highly abundant and expressed at Marker 113, in lower abundance and expression at Marker 33, and not present at Anemone. RNA-SIP analysis is ongoing but initial results from Marker 113 revealed that at mesophilic, thermophilic, or hyperthemophilic temperatures, different genera and autotrophic metabolisms dominated. In addition, RNA-SIP showed that at 80ºC a different hyperthermophilic group dominated at each vent. Overall, this study demonstrates the metabolic and taxonomic diversity of the subseafloor and better characterizes the subseafloor chemolithoautotrophs and their role in biogeochemical cycling.

  12. Nuclear reactor building

    DOEpatents

    Gou, P.F.; Townsend, H.E.; Barbanti, G.

    1994-04-05

    A reactor building for enclosing a nuclear reactor includes a containment vessel having a wetwell disposed therein. The wetwell includes inner and outer walls, a floor, and a roof defining a wetwell pool and a suppression chamber disposed there above. The wetwell and containment vessel define a drywell surrounding the reactor. A plurality of vents are disposed in the wetwell pool in flow communication with the drywell for channeling into the wetwell pool steam released in the drywell from the reactor during a LOCA for example, for condensing the steam. A shell is disposed inside the wetwell and extends into the wetwell pool to define a dry gap devoid of wetwell water and disposed in flow communication with the suppression chamber. In a preferred embodiment, the wetwell roof is in the form of a slab disposed on spaced apart support beams which define there between an auxiliary chamber. The dry gap, and additionally the auxiliary chamber, provide increased volume to the suppression chamber for improving pressure margin. 4 figures.

  13. Nuclear reactor building

    DOEpatents

    Gou, Perng-Fei; Townsend, Harold E.; Barbanti, Giancarlo

    1994-01-01

    A reactor building for enclosing a nuclear reactor includes a containment vessel having a wetwell disposed therein. The wetwell includes inner and outer walls, a floor, and a roof defining a wetwell pool and a suppression chamber disposed thereabove. The wetwell and containment vessel define a drywell surrounding the reactor. A plurality of vents are disposed in the wetwell pool in flow communication with the drywell for channeling into the wetwell pool steam released in the drywell from the reactor during a LOCA for example, for condensing the steam. A shell is disposed inside the wetwell and extends into the wetwell pool to define a dry gap devoid of wetwell water and disposed in flow communication with the suppression chamber. In a preferred embodiment, the wetwell roof is in the form of a slab disposed on spaced apart support beams which define therebetween an auxiliary chamber. The dry gap, and additionally the auxiliary chamber, provide increased volume to the suppression chamber for improving pressure margin.

  14. Geologic setting of massive sulfide deposits and hydrothermal vents along the southern Juan de Fuca Ridge

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Normark, W.R.; Morton, J.L.; Delaney, J.R.

    1982-01-01

    This report incorporates data from two cruises of the USGS vessel SP LEE: (1) L12-80-WF from 29 October to 13 November 1980, and (2) L11-81-WF from 4 to 15 September 1981. The 1980 cruise occurred long after the optimum weather window for this region. The natural results was that no photographic or sample stations could be attempted during nearly continuous gale- and storm-force winds, which twice forced the vessel to depart the work area for safety. A detailed bathymetric survey of a 35-km segment of the ridge axial zone was completed nonetheless, and the bathymetric map compiled from this surveymore » was used as the base for our second cruise in 1981. The second visit to the area was blessed with fair weather, and most of the cruise effort was devoted to photography and sampling, including dredging and hydrocasts in the axial valley segment, which is the central part of the area surveyed in 1980.« less

  15. Identification and mitigation of stray laser light in the Thomson scattering system on the Madison Symmetric Torus (MST)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacobson, C. M., E-mail: cjacobson@wisc.edu; Borchardt, M. T.; Den Hartog, D. J.

    The Thomson scattering diagnostic on the Madison Symmetric Torus (MST) records excessive levels of stray Nd:YAG laser light. Stray light saturates the 1064 nm spectral channel in all polychromators, which prevents absolute electron density measurements via Rayleigh scattering calibration. Furthermore, stray light contaminates adjacent spectral channels for r/a ≥ 0.75, which renders the diagnostic unable to make electron temperature measurements at these radii. In situ measurements of stray light levels during a vacuum vessel vent are used to identify stray light sources and strategies for reduction of stray light levels. Numerical modeling using Zemax OpticStudio supports these measurements. The modelmore » of the vacuum vessel and diagnostic includes synthetic collection optics to enable direct comparison of measured and simulated stray light levels. Modeling produces qualitatively similar stray light distributions to MST measurements, and quantifies the mitigation effects of stray light mitigation strategies prior to implementation.« less

  16. 40 CFR 65.107 - Standards: Pumps in light liquid service.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... or fuel gas system or connected by a closed vent system to a control device that complies with the requirements of § 65.115; or (C) Equipped with a closed-loop system that purges the barrier fluid into a... section. (3) Routed to a process or fuel gas system or equipped with a closed vent system. Any pump that...

  17. Building America Case Study: Design Guidance for Passive Vents in New Construction Multifamily Buildings, New York, New York

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2016-02-01

    This document addresses the use of passive vents as a source of outdoor air in multifamily buildings. The challenges associated with implementing passive vents and the factors affecting performance are outlined. A comprehensive design methodology and quantified performance metrics are provided. Two hypothetical design examples are provided to illustrate the process. This document is intended to be useful to designers, decision-makers, and contractors implementing passive ventilation strategies. It is also intended to be a resource for those responsible for setting high-performance building program requirements, especially pertaining to ventilation and outdoor air. To ensure good indoor air quality, a dedicated sourcemore » of outdoor air is an integral part of high-performance buildings. Presently, there is a lack of guidance pertaining to the design and installation of passive vents, resulting in poor system performance. This report details the criteria necessary for designing, constructing, and testing passive vent systems to enable them to provide consistent and reliable levels of ventilation air from outdoors.« less

  18. Experimental study of geysers through a vent pipe connected to flowing sewers.

    PubMed

    Huang, Biao; Wu, Shiqiang; Zhu, David Z; Schulz, Harry E

    2017-04-01

    Geysers of air-water mixtures in urban drainage systems is receiving considerable attention due to public safety concerns. However, the geyser formation process and its relation with air release from pressurized pipes are still relatively little known. A large-scale physical model, that consisted of a main tunnel with a diameter of 270 mm and a length of 25 m connecting two reservoirs and a vertical vent pipe, was established to investigate geyser evolution and pressure transients. Experimental results including dynamic pressure data and high speed videos were analysed in order to characterize geysering flow through the vent pipe. Pressure transients were observed during geysering events. Their amplitudes were found to be about three times the driving pressure head and their periods were close to the classic surge tank predictions. The influence of flow rate and vent pipe size were examined: geyser heights and pressure peaks decreased for small flow rate and large diameter vent pipe. It is suggested that geyser heights are related with the pressure head and the density of the air-water mixture.

  19. LOX Tank Helium Removal for Propellant Scavenging

    NASA Technical Reports Server (NTRS)

    Chato, David J.

    2009-01-01

    System studies have shown a significant advantage to reusing the hydrogen and oxygen left in these tanks after landing on the Moon in fuel cells to generate power and water for surface systems. However in the current lander concepts, the helium used to pressurize the oxygen tank can substantially degrade fuel cell power and water output by covering the reacting surface with inert gas. This presentation documents an experimental investigation of methods to remove the helium pressurant while minimizing the amount of the oxygen lost. This investigation demonstrated that significant quantities of Helium (greater than 90% mole fraction) remain in the tank after draining. Although a single vent cycle reduced the helium quantity, large amounts of helium remained. Cyclic venting appeared to be more effective. Three vent cycles were sufficient to reduce the helium to small (less than 0.2%) quantities. Two vent cycles may be sufficient since once the tank has been brought up to pressure after the second vent cycle the helium concentration has been reduced to the less than 0.2% level. The re-pressurization process seemed to contribute to diluting helium. This is as expected since in order to raise the pressure liquid oxygen must be evaporated. Estimated liquid oxygen loss is on the order of 82 pounds (assuming the third vent cycle is not required).

  20. Monitoring biodegradation of diesel fuel in bioventing processes using in situ respiration rate.

    PubMed

    Lee, T H; Byun, I G; Kim, Y O; Hwang, I S; Park, T J

    2006-01-01

    An in situ measuring system of respiration rate was applied for monitoring biodegradation of diesel fuel in a bioventing process for bioremediation of diesel contaminated soil. Two laboratory-scale soil columns were packed with 5 kg of soil that was artificially contaminated by diesel fuel as final TPH (total petroleum hydrocarbon) concentration of 8,000 mg/kg soil. Nutrient was added to make a relative concentration of C:N:P = 100:10:1. One soil column was operated with continuous venting mode, and the other one with intermittent (6 h venting/6 h rest) venting mode. On-line O2 and CO2 gas measuring system was applied to measure O2 utilisation and CO2 production during biodegradation of diesel for 5 months. Biodegradation rate of TPH was calculated from respiration rate measured by the on-line gas measuring system. There were no apparent differences between calculated biodegradation rates from two columns with different venting modes. The variation of biodegradation rates corresponded well with trend of the remaining TPH concentrations comparing other biodegradation indicators, such as C17/pristane and C18/phytane ratio, dehydrogenase activity, and the ratio of hydrocarbon utilising bacteria to total heterotrophic bacteria. These results suggested that the on-line measuring system of respiration rate would be applied to monitoring biodegradation rate and to determine the potential applicability of bioventing process for bioremediation of oil contaminated soil.

  1. Simplified Methodology to Estimate the Maximum Liquid Helium (LHe) Cryostat Pressure from a Vacuum Jacket Failure

    NASA Technical Reports Server (NTRS)

    Ungar, Eugene K.; Richards, W. Lance

    2015-01-01

    The aircraft-based Stratospheric Observatory for Infrared Astronomy (SOFIA) is a platform for multiple infrared astronomical observation experiments. These experiments carry sensors cooled to liquid helium temperatures. The liquid helium supply is contained in large (i.e., 10 liters or more) vacuum-insulated dewars. Should the dewar vacuum insulation fail, the inrushing air will condense and freeze on the dewar wall, resulting in a large heat flux on the dewar's contents. The heat flux results in a rise in pressure and the actuation of the dewar pressure relief system. A previous NASA Engineering and Safety Center (NESC) assessment provided recommendations for the wall heat flux that would be expected from a loss of vacuum and detailed an appropriate method to use in calculating the maximum pressure that would occur in a loss of vacuum event. This method involved building a detailed supercritical helium compressible flow thermal/fluid model of the vent stack and exercising the model over the appropriate range of parameters. The experimenters designing science instruments for SOFIA are not experts in compressible supercritical flows and do not generally have access to the thermal/fluid modeling packages that are required to build detailed models of the vent stacks. Therefore, the SOFIA Program engaged the NESC to develop a simplified methodology to estimate the maximum pressure in a liquid helium dewar after the loss of vacuum insulation. The method would allow the university-based science instrument development teams to conservatively determine the cryostat's vent neck sizing during preliminary design of new SOFIA Science Instruments. This report details the development of the simplified method, the method itself, and the limits of its applicability. The simplified methodology provides an estimate of the dewar pressure after a loss of vacuum insulation that can be used for the initial design of the liquid helium dewar vent stacks. However, since it is not an exact tool, final verification of the dewar pressure vessel design requires a complete, detailed real fluid compressible flow model of the vent stack. The wall heat flux resulting from a loss of vacuum insulation increases the dewar pressure, which actuates the pressure relief mechanism and results in high-speed flow through the dewar vent stack. At high pressures, the flow can be choked at the vent stack inlet, at the exit, or at an intermediate transition or restriction. During previous SOFIA analyses, it was observed that there was generally a readily identifiable section of the vent stack that would limit the flow – e.g., a small diameter entrance or an orifice. It was also found that when the supercritical helium was approximated as an ideal gas at the dewar condition, the calculated mass flow rate based on choking at the limiting entrance or transition was less than the mass flow rate calculated using the detailed real fluid model2. Using this lower mass flow rate would yield a conservative prediction of the dewar’s wall heat flux capability. The simplified method of the current work was developed by building on this observation.

  2. Dewar technology study

    NASA Technical Reports Server (NTRS)

    Davis, W.

    1975-01-01

    The development of a Dewar system for handling liquid helium under weightless conditions is described. Porous plug designs for the prevention of superfluid creep out of the dewar through the vent line were evaluated. For the purpose of designing a neck to provide a transition from the cold cavity to the outside, the loads carried by the neck and equipment supports were studied. Temperature, pressure, and mass flow instrumentation for monitoring Dewar performance were also evaluated. In addition, multilayer blankets consisting of aluminized Mylar separated by Dacron net sheets were designed to insulate the pressure vessel. The dewar system is suggested for use with the star tracking telescope aboard the relativity satellite.

  3. Near-vent chemical processes in a hydrothermal plume: Insights from an integrated study of the Endeavour segment

    NASA Astrophysics Data System (ADS)

    Coogan, L. A.; Attar, A.; Mihaly, S. F.; Jeffries, M.; Pope, M.

    2017-04-01

    The Endeavour segment of the Juan de Fuca mid-ocean ridge is one of the best studied ridge segments and has recently been instrumented as part of Ocean Networks Canada's NEPTUNE cabled observatory. Here we investigate the interaction between high-temperature vent fluids and the overlying water column. A new tow-yo survey found that the average temperature anomaly in the neutrally buoyant plume was ˜0.043°C. The water column temperature and light attenuation anomalies correlate linearly in some areas of the plume but in other areas there is a low light attenuation anomaly relative to the temperature anomaly. This temperature excess is interpreted to reflect heat input through (particle-poor) diffuse flow. If this is correct, about half of the heat flux along the Endeavour segment comes from diffuse flow. Sediment trap and push core data show that the mass accumulation rate of the hydrothermal component of the sediments decreases rapidly with distance from the major vent fields. Large changes in the composition of the hydrothermal component of the sediments also occur with distance from the vent fields. The composition of the sediments indicates (i) sulfides precipitate early and accumulate most rapidly close to the vents with a preferential order of element removal from the plume of Cd > Ag > Cu > Co ˜ Fe; (ii) barite is deposited somewhat further from the vents. Strontium and Pb appear to be strongly incorporated in barite and/or other sulfate minerals; (iii) at most a few percent of the mass of these "insoluble" elements that is vented gets deposited within 1.5 km of the vents.

  4. High-throughput sequencing and analysis of the gill tissue transcriptome from the deep-sea hydrothermal vent mussel Bathymodiolus azoricus

    PubMed Central

    2010-01-01

    Background Bathymodiolus azoricus is a deep-sea hydrothermal vent mussel found in association with large faunal communities living in chemosynthetic environments at the bottom of the sea floor near the Azores Islands. Investigation of the exceptional physiological reactions that vent mussels have adopted in their habitat, including responses to environmental microbes, remains a difficult challenge for deep-sea biologists. In an attempt to reveal genes potentially involved in the deep-sea mussel innate immunity we carried out a high-throughput sequence analysis of freshly collected B. azoricus transcriptome using gills tissues as the primary source of immune transcripts given its strategic role in filtering the surrounding waterborne potentially infectious microorganisms. Additionally, a substantial EST data set was produced and from which a comprehensive collection of genes coding for putative proteins was organized in a dedicated database, "DeepSeaVent" the first deep-sea vent animal transcriptome database based on the 454 pyrosequencing technology. Results A normalized cDNA library from gills tissue was sequenced in a full 454 GS-FLX run, producing 778,996 sequencing reads. Assembly of the high quality reads resulted in 75,407 contigs of which 3,071 were singletons. A total of 39,425 transcripts were conceptually translated into amino-sequences of which 22,023 matched known proteins in the NCBI non-redundant protein database, 15,839 revealed conserved protein domains through InterPro functional classification and 9,584 were assigned with Gene Ontology terms. Queries conducted within the database enabled the identification of genes putatively involved in immune and inflammatory reactions which had not been previously evidenced in the vent mussel. Their physical counterpart was confirmed by semi-quantitative quantitative Reverse-Transcription-Polymerase Chain Reactions (RT-PCR) and their RNA transcription level by quantitative PCR (qPCR) experiments. Conclusions We have established the first tissue transcriptional analysis of a deep-sea hydrothermal vent animal and generated a searchable catalog of genes that provides a direct method of identifying and retrieving vast numbers of novel coding sequences which can be applied in gene expression profiling experiments from a non-conventional model organism. This provides the most comprehensive sequence resource for identifying novel genes currently available for a deep-sea vent organism, in particular, genes putatively involved in immune and inflammatory reactions in vent mussels. The characterization of the B. azoricus transcriptome will facilitate research into biological processes underlying physiological adaptations to hydrothermal vent environments and will provide a basis for expanding our understanding of genes putatively involved in adaptations processes during post-capture long term acclimatization experiments, at "sea-level" conditions, using B. azoricus as a model organism. PMID:20937131

  5. In-Situ pH Measurements in Mid-Ocean Ridge Hydrothermal Vent Fluids: Constraints on Subseafloor Alteration Processes at Crustal Depths

    NASA Astrophysics Data System (ADS)

    Schaen, A. T.; Ding, K.; Seyfried, W. E.

    2013-12-01

    Developments in electrochemistry and material science have facilitated the construction of ceramic (YSZ) based chemical sensor systems that can be used to measure and monitor pH and redox in aqueous fluids at elevated temperatures and pressures. In recent years, these sensor systems have been deployed to acquire real-time and time series in-situ data for high-temperature hydrothermal vent fluids at the Main Endeavour Field (Juan de Fuca Ridge), 9oN (East Pacific Rise), and at the ultramafic-hosted Rainbow field (36oN, Mid-Atlantic Ridge). Here we review in-situ pH data measured at these sites and apply these data to estimate the pH of fluids ascending to the seafloor from hydrothermal alteration zones deeper in the crust. In general, in-situ pH measured at virtually all vent sites is well in excess of that measured shipboard owing to the effects of temperature on the distribution of aqueous species and the solubility of metal sulfides, especially Cu and Zn, originally dissolved in the vent fluids. In situ pH measurements determined at MEF (Sully vent) and EPR 9oN (P-vent) in 2005 and 2008 were 4.4 ×0.02 and 5.05×0.05, respectively. The temperature and pressure (seafloor) of the vent fluids at each of the respective sites were 356oC and 220 bar, and 380oC and 250 bar. Plotting these data with respect to fluid density reveals that the in-situ pH of each vent fluid is approximately 1.5 pH units below neutrality. The density-pH (in-situ) correlation, however, is important because it provides a means from which the vent fluids were derived. Using dissolved silica and chloride from fluid samples at the MEF (Sully) suggest T/P conditions of approximately 435oC, 380 bar, based on quartz-fluid and NaCl-H2O systems. At the fluid density calculated for these conditions, pH (in-situ) is predicted to be ~6.2. Attempts are presently underway to assess the effect of the calculated pH on metal sulfide and silicate (e.g., plagioclase, chlorite) solubility in comparison with constraints imposed by the full range of chemical components in the vent fluids sampled and analyzed in association with pH (in-situ) measurements. Since pH is a master variable in all geochemical systems, the novel approach proposed here may provide new insight on hydrothermal alteration processes at conditions difficult or impossible to assess by more traditional means, ultimately influencing hydrothermal fluid fluxes.

  6. Continuing Evolution of the Hydrothermal System at the RIDGE2000 ISS, 9-10° N EPR: 1991-2004

    NASA Astrophysics Data System (ADS)

    von Damm, K. L.; Parker, C. M.; Beers, K. A.; Hyde, A. A.

    2004-12-01

    We have been studying the evolution of the chemical composition of the mid-ocean ridge (MOR) hydrothermal system on the East Pacific Rise from 9° 46-51'N since it was impacted by volcanic eruptions in 1991/2. We have been using the chemical and temperature data to infer the processes that are occurring subseafloor in the upper oceanic crust. As of March 2004, the chemical compositions of the vent fluids from this site have not yet stabilized. This observation is helping us to better understand not only the impact of magmatic events on these systems, but also the time scales on which they occur. Centered at the RIDGE2000 ISS "bull's-eye" at 9° 50'N we have noted a striking increase in the number of hydrothermal vents as well as in their measured fluid temperatures beginning after ~2000. In November 2003 we first noted the formation of a black smoker vent at the Tica site (measured T=342° C). In March 2004 we identified another new area of robust flow near the Bio9 vents at 9° 50'N, the 'Alvinellid Mat,' that we anticipate will form an additional black smoker to the three currently active at this site. In March 2004 we measured temperatures of 388° C in fluids from both the Bio9 and Bio9' smokers, putting them essentially on the two phase curve for seawater at this depth. For all of the Bio9 vents, as well as Tica, the fluids contain less than 300 mmoles/kg of Cl, approximately half the local seawater concentration. These high temperature and low Cl concentrations are accompanied by unusually low Si concentrations, <9.5 mmoles/kg. These data suggest a relatively shallow depth of reaction for the fluids, within a few hundred meters of the seafloor. These are the hottest temperatures measured in the Bio9 vents since the eruption in 1992. In contrast, the temperatures at P vent, about 60m south have cooled by ˜15° C since 2002. About 400m south, the chlorinity of the fluids from Ty and Io vents have increased, and Tube Worm Pillar, about 400m further south has become inactive. Therefore the changes in the vent fluids vary widely and often in opposite senses, over ˜1.5km of very hydrothermally active ridge. A more complete discussion of the changes and our interpretation of their implications for processes occurring subseafloor will be presented.

  7. 40 CFR 65.115 - Standards: Closed vent systems and control devices; or emissions routed to a fuel gas system or...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Standards: Closed vent systems and control devices; or emissions routed to a fuel gas system or process. 65.115 Section 65.115 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Equipment Leaks § 65.115 Standards:...

  8. 40 CFR Table 7 to Subpart Jjj of... - Group 1 Batch Process Vents and Aggregate Batch Vent Streams-Monitoring, Recordkeeping, and...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... collected—PR. d,e Carbon Adsorber f a. Total regeneration steam flow or nitrogen flow, or pressure (gauge or absolute) during carbon bed regeneration cycle(s), and 1. Record the total regeneration steam flow or nitrogen flow, or pressure for each carbon bed regeneration cycle.2. Record and report the total...

  9. 40 CFR Table 6 to Subpart U of... - Group 1 Batch Front-End Process Vents and Aggregate Batch Vent Streams-Monitoring, Recordkeeping...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... collected—PR. d,e Carbon adsorber f a. Total regeneration steam flow or nitrogen flow, or pressure gauge or absolute) during carbon bed regeneration cycle(s), and 1. Record of total regeneration steam flow or nitrogen flow, or pressure for each carbon bed regeneration cycle. 2. Record and report the total...

  10. 40 CFR Table 6 to Subpart U of... - Group 1 Batch Front-End Process Vents and Aggregate Batch Vent Streams-Monitoring, Recordkeeping...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... collected—PR. d,e Carbon adsorber f a. Total regeneration steam flow or nitrogen flow, or pressure gauge or absolute) during carbon bed regeneration cycle(s), and 1. Record of total regeneration steam flow or nitrogen flow, or pressure for each carbon bed regeneration cycle. 2. Record and report the total...

  11. 40 CFR Table 7 to Subpart Jjj of... - Group 1 Batch Process Vents and Aggregate Batch Vent Streams-Monitoring, Recordkeeping, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... collected—PR. d,e Carbon Adsorber f a. Total regeneration steam flow or nitrogen flow, or pressure (gauge or absolute) during carbon bed regeneration cycle(s), and 1. Record the total regeneration steam flow or nitrogen flow, or pressure for each carbon bed regeneration cycle.2. Record and report the total...

  12. 40 CFR Table 6 to Subpart U of... - Group 1 Batch Front-End Process Vents and Aggregate Batch Vent Streams-Monitoring, Recordkeeping...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... collected—PR. d,e Carbon adsorber f a. Total regeneration steam flow or nitrogen flow, or pressure gauge or absolute) during carbon bed regeneration cycle(s), and 1. Record of total regeneration steam flow or nitrogen flow, or pressure for each carbon bed regeneration cycle. 2. Record and report the total...

  13. 40 CFR Table 6 to Subpart U of... - Group 1 Batch Front-End Process Vents and Aggregate Batch Vent Streams-Monitoring, Recordkeeping...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... collected—PR. d,e Carbon adsorber f a. Total regeneration steam flow or nitrogen flow, or pressure gauge or absolute) during carbon bed regeneration cycle(s), and 1. Record of total regeneration steam flow or nitrogen flow, or pressure for each carbon bed regeneration cycle. 2. Record and report the total...

  14. 40 CFR Table 7 to Subpart Jjj of... - Group 1 Batch Process Vents and Aggregate Batch Vent Streams-Monitoring, Recordkeeping, and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... collected—PR. d,e Carbon Adsorber f a. Total regeneration steam flow or nitrogen flow, or pressure (gauge or absolute) during carbon bed regeneration cycle(s), and 1. Record the total regeneration steam flow or nitrogen flow, or pressure for each carbon bed regeneration cycle.2. Record and report the total...

  15. 40 CFR Table 7 to Subpart Jjj of... - Group 1 Batch Process Vents and Aggregate Batch Vent Streams-Monitoring, Recordkeeping, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... collected—PR. d,e Carbon Adsorber f a. Total regeneration steam flow or nitrogen flow, or pressure (gauge or absolute) during carbon bed regeneration cycle(s), and 1. Record the total regeneration steam flow or nitrogen flow, or pressure for each carbon bed regeneration cycle.2. Record and report the total...

  16. 40 CFR Table 6 to Subpart U of... - Group 1 Batch Front-End Process Vents and Aggregate Batch Vent Streams-Monitoring, Recordkeeping...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... collected—PR. d e Carbon adsorber f a. Total regeneration steam flow or nitrogen flow, or pressure gauge or absolute) during carbon bed regeneration cycle(s), and 1. Record of total regeneration steam flow or nitrogen flow, or pressure for each carbon bed regeneration cycle. 2. Record and report the total...

  17. 40 CFR Table 7 to Subpart Jjj of... - Group 1 Batch Process Vents and Aggregate Batch Vent Streams-Monitoring, Recordkeeping, and...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... collected—PR. d e Carbon Adsorber f a. Total regeneration steam flow or nitrogen flow, or pressure (gauge or absolute) during carbon bed regeneration cycle(s), and 1. Record the total regeneration steam flow or nitrogen flow, or pressure for each carbon bed regeneration cycle.2. Record and report the total...

  18. 40 CFR 63.1026 - Pumps in light liquid service standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... or fuel gas system or connected by a closed-vent system to a control device that complies with the requirements of either § 63.1034 or § 63.1021(b) of this part; or (C) Equipped with a closed-loop system that... paragraph (b) of this section. (3) Routed to a process or fuel gas system or equipped with a closed vent...

  19. Mud volcano venting induced gas hydrate formation at the upper slope accretionary wedge, offshore SW Taiwan

    NASA Astrophysics Data System (ADS)

    Lin, Saulwood; Tseng, Yi-Ting; Cheng, Wan-Yen; Chou, Cheng-Tien; Chen, NeiChen; Hsieh, I.-Chih

    2016-04-01

    TsanYao Mud Volcano (TYMV) is the largest mud volcano cone in the Hengchun Mud Volcano Group (HCMVG), located at the upper slope of the accrretionary wedge, southwest of Taiwan. The region is under active tectonic activity with the Philippine Plate, moving northwestward at a rate of ~8 cm/year. This region also receives huge quantity of suspended particle load of ~100 mT/year at present time from adjacent small rivers of the Island of Taiwan. Large loads of suspended sediments influx become a major source of organic carbon and later gas and other hydrocarbon. Gas and fluid in the mud volcano are actively venting from deep to the sea floor on the upper slope of the accretionary wedge. In order to understand venting on the HCMVG, echo sounder, towcam and coring were carried out. Pore water sulfate, chloride, potassium, calcium, stable isotope O-18, gas compositions, dissolved sulfide were analysed. The HCMVG consists of 12 volcano cones of different sizes. Large quantity of gas and fluid are venting directly from deep to the TYMV structure high, as well as 50+ other vents as appeared as flares on the echo sounder. Some flares are reaching to the atmosphere and likely a source of green house gases to the atmosphere. Venting fluids include gas bubbles, suspended particle, mud, and breccia. Breccia size could reach more than 12 cm in diameter. Circular bands in different color appeared around the cone may represent stages of vent eruptions. Compositions of vent gas include methane, ethane and propane. High proportions of ethane and propane in the vent gas demonstrated that source of gas are thermogenic in origin. Patchy authigenic carbonate, bacterial mats, bivalves, tube worms and other chemosynthesis organisms were supported by venting gas AOM process near the sea floor. Pore water chloride concentrations show distinct variation pattern from center cone to the side of the volcano, with low in the center and high away from the cone. Pore water with higher than seawater chloride indicated gas hydrate formation in sediments away from the mud volcano cone.

  20. Modelling hydrothermal venting in volcanic sedimentary basins: Impact on hydrocarbon maturation and paleoclimate

    NASA Astrophysics Data System (ADS)

    Iyer, Karthik; Schmid, Daniel W.; Planke, Sverre; Millett, John

    2017-06-01

    Vent structures are intimately associated with sill intrusions in sedimentary basins globally and are thought to have been formed contemporaneously due to overpressure generated by gas generation during thermogenic breakdown of kerogen or boiling of water. Methane and other gases generated during this process may have driven catastrophic climate change in the geological past. In this study, we present a 2D FEM/FVM model that accounts for 'explosive' vent formation by fracturing of the host rock based on a case study in the Harstad Basin, offshore Norway. Overpressure generated by gas release during kerogen breakdown in the sill thermal aureole causes fracture formation. Fluid focusing and overpressure migration towards the sill tips results in vent formation after only few tens of years. The size of the vent depends on the region of overpressure accessed by the sill tip. Overpressure migration occurs in self-propagating waves before dissipating at the surface. The amount of methane generated in the system depends on TOC content and also on the type of kerogen present in the host rock. Generated methane moves with the fluids and vents at the surface through a single, large vent structure at the main sill tip matching first-order observations. Violent degassing takes place within the first couple of hundred years and occurs in bursts corresponding to the timing of overpressure waves. The amount of methane vented through a single vent is only a fraction (between 5 and 16%) of the methane generated at depth. Upscaling to the Vøring and Møre Basins, which are a part of the North Atlantic Igneous Province, and using realistic host rock carbon content and kerogen values results in a smaller amount of methane vented than previously estimated for the PETM. Our study, therefore, suggests that the negative carbon isotope excursion (CIE) observed in the fossil record could not have been caused by intrusions within the Vøring and Møre Basins alone and that a contribution from other regions in the NAIP is also required to drive catastrophic climate change.

Top