Sample records for processes including maintenance

  1. Phase 111A Crew Interface Specifications Development for Inflight Maintenance and Stowage Functions

    NASA Technical Reports Server (NTRS)

    Carl, John G.

    1973-01-01

    This report presents the findings and data products developed during the Phase IIIA Crew Interface Specification Study for Inflight Maintenance and Stowage Functions, performed by General Electric for the NASA, Johnson Space Center with a set of documentation that can be used as definitive guidelines to improve the present process of defining, controlling and managing flight crew interface requirements that are related to inflight maintenance (including assembly and servicing) and stowage functions. During the Phase IIIA contract period, the following data products were developed: 1) Projected NASA Crew Procedures/Flight Data File Development Process. 2) Inflight Maintenance Management Process Description. 3) Preliminary Draft, General Specification, Inflight Maintenance Management Requirements. 4) Inflight Maintenance Operational Process Description. 5) Preliminary Draft, General Specification, Inflight Maintenance Task and Support Requirements Analysis. 6) Suggested IFM Data Processing Reports for Logistics Management The above Inflight Maintenance data products have been developed during the Phase IIIA study after review of Space Shuttle Program Documentation, including the Level II Integrated Logistics Requirements and other DOD and NASA data relative to Payloads Accommodations and Satellite On-Orbit Servicing. These Inflight Maintenance data products were developed to be in consonance with Space Shuttle Program technical and management requirements.

  2. Deferred Maintenance Program Handbook.

    ERIC Educational Resources Information Center

    California State Dept. of General Services, Sacramento. Office of Public School Construction.

    This handbook provides process information on California's Deferred Maintenance Program, including a description of the administering body of law. Chapters discuss the program's process on the topics of basic/additional apportionment, fund release (basic/additional and critical hardship), the Deferred Maintenance Five-Year Plan, district deposit,…

  3. Innovation for maintenance technology improvements

    NASA Technical Reports Server (NTRS)

    Shives, T. R. (Editor); Willard, W. A. (Editor)

    1982-01-01

    A group of 34 submitted entries (32 papers and 2 abstracts) from the 33rd meeting of the Mechanical Failures Prevention Group whose subject was maintenance technology improvement through innovation. Areas of special emphasis included maintenance concepts, maintenance analysis systems, improved maintenance processes, innovative maintenance diagnostics and maintenance indicators, and technology improvements for power plant applications.

  4. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hendrickson, D.W.

    1995-03-14

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

  5. Airborne Oceanographic Lidar (AOL) (Global Carbon Cycle)

    NASA Technical Reports Server (NTRS)

    2003-01-01

    This bimonthly contractor progress report covers the operation, maintenance and data management of the Airborne Oceanographic Lidar and the Airborne Topographic Mapper. Monthly activities included: mission planning, sensor operation and calibration, data processing, data analysis, network development and maintenance and instrument maintenance engineering and fabrication.

  6. Emotion and working memory: evidence for domain-specific processes for affective maintenance.

    PubMed

    Mikels, Joseph A; Reuter-Lorenz, Patricia A; Beyer, Jonathan A; Fredrickson, Barbara L

    2008-04-01

    Working memory is comprised of separable subsystems for visual and verbal information, but what if the information is affective? Does the maintenance of affective information rely on the same processes that maintain nonaffective information? The authors address this question using a novel delayed-response task developed to investigate the short-term maintenance of affective memoranda. Using selective interference methods the authors find that a secondary emotion-regulation task impaired affect intensity maintenance, whereas secondary cognitive tasks disrupted brightness intensity maintenance, but facilitated affect maintenance. Additionally, performance on the affect maintenance task depends on the valence of the maintained feeling, further supporting the domain-specific nature of the task. The importance of affect maintenance per se is further supported by demonstrating that the observed valence effects depend on a memory delay and are not evident with simultaneous presentation of stimuli. These findings suggest that the working memory system may include domain-specific components that are specialized for the maintenance of affective memoranda. (Copyright) 2008 APA.

  7. Implementation of sustainability in bridge design, construction and maintenance.

    DOT National Transportation Integrated Search

    2012-12-01

    The focus of this research is to develop a framework for more sustainable design and construction : processes for new bridges, and sustainable maintenance practices for existing bridges. The framework : includes a green rating system for bridges. The...

  8. Toward full life cycle control: Adding maintenance measurement to the SEL

    NASA Technical Reports Server (NTRS)

    Rombach, H. Dieter; Ulery, Bradford T.; Valett, Jon D.

    1992-01-01

    Organization-wide measurement of software products and processes is needed to establish full life cycle control over software products. The Software Engineering Laboratory (SEL)--a joint venture between NASA GSFC, the University of Maryland, and Computer Sciences Corporation--started measurement of software development more than 15 years ago. Recently, the measurement of maintenance was added to the scope of the SEL. In this article, the maintenance measurement program is presented as an addition to the already existing and well-established SEL development measurement program and evaluated in terms of its immediate benefits and long-term improvement potential. Immediate benefits of this program for the SEL include an increased understanding of the maintenance domain, the differences and commonalities between development and maintenance, and the cause-effect relationships between development and maintenance. Initial results from a sample maintenance study are presented to substantiate these benefits. The long-term potential of this program includes the use of maintenance baselines to better plan and manage future projects and to improve development and maintenance practices for future projects wherever warranted.

  9. Pavement maintenance optimization model using Markov Decision Processes

    NASA Astrophysics Data System (ADS)

    Mandiartha, P.; Duffield, C. F.; Razelan, I. S. b. M.; Ismail, A. b. H.

    2017-09-01

    This paper presents an optimization model for selection of pavement maintenance intervention using a theory of Markov Decision Processes (MDP). There are some particular characteristics of the MDP developed in this paper which distinguish it from other similar studies or optimization models intended for pavement maintenance policy development. These unique characteristics include a direct inclusion of constraints into the formulation of MDP, the use of an average cost method of MDP, and the policy development process based on the dual linear programming solution. The limited information or discussions that are available on these matters in terms of stochastic based optimization model in road network management motivates this study. This paper uses a data set acquired from road authorities of state of Victoria, Australia, to test the model and recommends steps in the computation of MDP based stochastic optimization model, leading to the development of optimum pavement maintenance policy.

  10. [Medical Equipment Maintenance Methods].

    PubMed

    Liu, Hongbin

    2015-09-01

    Due to the high technology and the complexity of medical equipment, as well as to the safety and effectiveness, it determines the high requirements of the medical equipment maintenance work. This paper introduces some basic methods of medical instrument maintenance, including fault tree analysis, node method and exclusive method which are the three important methods in the medical equipment maintenance, through using these three methods for the instruments that have circuit drawings, hardware breakdown maintenance can be done easily. And this paper introduces the processing methods of some special fault conditions, in order to reduce little detours in meeting the same problems. Learning is very important for stuff just engaged in this area.

  11. Dynamics of Implementation and Maintenance of Organizational Health Interventions.

    PubMed

    Jalali, Mohammad S; Rahmandad, Hazhir; Bullock, Sally Lawrence; Ammerman, Alice

    2017-08-15

    In this study, we present case studies to explore the dynamics of implementation and maintenance of health interventions. We analyze how specific interventions are built and eroded, how the building and erosion mechanisms are interconnected, and why we can see significantly different erosion rates across otherwise similar organizations. We use multiple comparative obesity prevention case studies to provide empirical information on the mechanisms of interest, and use qualitative systems modeling to integrate our evolving understanding into an internally consistent and transparent theory of the phenomenon. Our preliminary results identify reinforcing feedback mechanisms, including design of organizational processes, motivation of stakeholders, and communication among stakeholders, which influence implementation and maintenance of intervention components. Over time, these feedback mechanisms may drive a wedge between otherwise similar organizations, leading to distinct configurations of implementation and maintenance processes.

  12. Dynamics of Implementation and Maintenance of Organizational Health Interventions

    PubMed Central

    Rahmandad, Hazhir; Bullock, Sally Lawrence; Ammerman, Alice

    2017-01-01

    In this study, we present case studies to explore the dynamics of implementation and maintenance of health interventions. We analyze how specific interventions are built and eroded, how the building and erosion mechanisms are interconnected, and why we can see significantly different erosion rates across otherwise similar organizations. We use multiple comparative obesity prevention case studies to provide empirical information on the mechanisms of interest, and use qualitative systems modeling to integrate our evolving understanding into an internally consistent and transparent theory of the phenomenon. Our preliminary results identify reinforcing feedback mechanisms, including design of organizational processes, motivation of stakeholders, and communication among stakeholders, which influence implementation and maintenance of intervention components. Over time, these feedback mechanisms may drive a wedge between otherwise similar organizations, leading to distinct configurations of implementation and maintenance processes. PMID:28809807

  13. Evaluation and Repair of Concrete Structures: Annotated Bibliography 1978 - 1988. Volume 1. (Repair, Evaluation, Maintenance and Rehabilitation Research Program)

    DTIC Science & Technology

    1991-06-01

    32303, "Application of New Technology to Maintenance and Minor Repair," for which Mr. James E. McDonald (CEWES-SC-R) was Principal Investigator. Dr. Tony...materials, shotcrete, and silica-fume concrete. 6. Section -D contains 710 references-on maintenance and repair tech- niques including bonding new concrote to...sys- -tem. The process problems have been resolved-by introduction of new instrumentation, static mixers, elimination of washers and high density

  14. A strategic value management approach for energy and maintenance management in a building

    NASA Astrophysics Data System (ADS)

    Nawi, Mohd Nasrun Mohd; Dahlan, Nofri Yenita; Nadarajan, Santhirasegaran

    2015-05-01

    Fragmentation process is always been highlighted by the stakeholders in the construction industry as one of the `critical' issue that diminishing the opportunity for stakeholders that involved during the operation and maintenance stage to influence design decisions. Failure of design professionals to consider how a maintenance contractor or facility manager will construct the design thus results in higher operating cost, wastage, defects during the maintenance and operation process. Moving towards team integration is considered a significant strategy for overcoming the issue. Value Management is a style of management dedicated to guiding people and promoting innovation with the aim to improve overall building performance through structured, team-oriented exercises which make explicit, and appraise subsequent decisions, by reference to the value requirements of the clients. Accordingly, this paper discusses the fragmentation issue in more detail including the definition, causes and effects to the maintenance and operation of building and at the same time will highlighted the potential of VM integrated team approach as a strategic management approach for overcoming that issue. It also explores that the team integration strategy alleviates scheduling problems, delays and disputes during the construction process, and, hence, prevent harming the overall building performance.

  15. Crew interface specification development study for in-flight maintenance and stowage functions

    NASA Technical Reports Server (NTRS)

    Carl, J. G.

    1971-01-01

    The need and potential solutions for an orderly systems engineering approach to the definition, management and documentation requirements for in-flight maintenance, assembly, servicing, and stowage process activities of the flight crews of future spacecraft were investigated. These processes were analyzed and described using a new technique (mass/function flow diagramming), developed during the study, to give visibility to crew functions and supporting requirements, including data products. This technique is usable by NASA for specification baselines and can assist the designer in identifying both upper and lower level requirements associated with these processes. These diagrams provide increased visibility into the relationships between functions and related equipments being utilized and managed and can serve as a common communicating vehicle between the designer, program management, and the operational planner. The information and data product requirements to support the above processes were identified along with optimum formats and contents of these products. The resulting data product concepts are presented to support these in-flight maintenance and stowage processes.

  16. Tools and Techniques for Evaluating the Effects of Maintenance Resource Management (MRM) in Air Safety

    NASA Technical Reports Server (NTRS)

    Taylor, James C.

    2002-01-01

    This research project was designed as part of a larger effort to help Human Factors (HF) implementers, and others in the aviation maintenance community, understand, evaluate, and validate the impact of Maintenance Resource Management (MRM) training programs, and other MRM interventions; on participant attitudes, opinions, behaviors, and ultimately on enhanced safety performance. It includes research and development of evaluation methodology as well as examination of psychological constructs and correlates of maintainer performance. In particular, during 2001, three issues were addressed. First a prototype process for measuring performance was developed and used. Second an automated calculator was developed to aid the HF implementer user in analyzing and evaluating local survey data. These results include being automatically compared with the experience from all MRM programs studied since 1991. Third the core survey (the Maintenance Resource Management Technical Operations Questionnaire, or 'MRM/TOQ') was further developed and tested to include topics of added relevance to the industry.

  17. The Social Identity Model of Cessation Maintenance: formulation and initial evidence.

    PubMed

    Frings, Daniel; Albery, Ian P

    2015-05-01

    Group therapy can be highly influential in helping addicts (individuals presenting with problematic addictive behaviors) achieve and maintain cessation. The efficacy of such groups can be understood by the effects they have on members' social identity and also through associated group processes. The current paper introduces the Social Identity Model of Cessation Maintenance (SIMCM). The SIMCM outlines how a number of processes (including self/collective efficacy and esteem, normative structure and social support and control) may affect cessation maintenance. It also provides a framework to make predictions about how automatic and/or implicit processes influence the activation of addiction relevant identities through cognitive accessibility and complexity in particular. A review of initial empirical evidence supporting some of the key specified relationships is provided, along with potential applications in therapy settings. Insights into how SIMCM could be generalized beyond treatment contexts and avenues for future research are outlined. Copyright © 2014 Elsevier Ltd. All rights reserved.

  18. Commentary on the shifting processes model: a conceptual model for weight management.

    PubMed

    Pagoto, Sherry; Rodrigues, Stephanie

    2013-12-01

    Macchi and colleagues propose a theoretical model that merges concepts from the biopsychosocial model and family systems theory to produce a broader framework for understanding weight loss and maintenance (see record 2013-28564-001). The Shifting Processes Model views individual weight loss and maintenance in the context of family dynamics, including family eating and exercise habits, home environment, and family relationships. The authors reason that traditional models put the burden of change on the individual rather than the family system, when the latter is an important context of individual behavior.

  19. Guidance on including ITS elements in transportation projects

    DOT National Transportation Integrated Search

    2001-01-01

    The purpose of this document is to provide guidance for including ITS equipment and technologies as part of traditional transportation construction or maintenance projects. This document is not intended to simplify the planning process, rather it is ...

  20. Guidelines for Contracting Microfilming Services.

    ERIC Educational Resources Information Center

    Byrne, Sherry

    1986-01-01

    Outlines the process involved in selecting an outside filming agent for the purpose of preserving a library's or archive's holdings. Guidelines include project planning, selecting a filming agent, and contract preparation and maintenance. A sample contract is included. (Author/EM)

  1. NASA IVHM Technology Experiment for X-vehicles (NITEX)

    NASA Technical Reports Server (NTRS)

    Sandra, Hayden; Bajwa, Anupa

    2001-01-01

    The purpose of the NASA IVHM Technology Experiment for X-vehicles (NITEX) is to advance the development of selected IVHM technologies in a flight environment and to demonstrate the potential for reusable launch vehicle ground processing savings. The technologies to be developed and demonstrated include system-level and detailed diagnostics for real-time fault detection and isolation, prognostics for fault prediction, automated maintenance planning based on diagnostic and prognostic results, and a microelectronics hardware platform. Complete flight The Evolution of Flexible Insulation as IVHM consists of advanced sensors, distributed data acquisition, data processing that includes model-based diagnostics, prognostics and vehicle autonomy for control or suggested action, and advanced data storage. Complete ground IVHM consists of evolved control room architectures, advanced applications including automated maintenance planning and automated ground support equipment. This experiment will advance the development of a subset of complete IVHM.

  2. [A design of software for management of hospital equipment maintenance process].

    PubMed

    Xie, Haiyuan; Liu, Yiqing

    2010-03-01

    According to the circumstance of hospital equipment maintenance, we designed a computer program for management of hospital equipment maintenance process by Java programming language. This program can control the maintenance process, increase the efficiency; and be able to fix the equipment location.

  3. 75 FR 19665 - Final Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... processes, including welding, heat treating, and nondestructive testing, are controlled and accomplished by... that when stressed under operating, maintenance, testing, and postulated accident conditions (1) the...

  4. The Implementation and Maintenance of a Behavioral Safety Process in a Petroleum Refinery

    ERIC Educational Resources Information Center

    Myers, Wanda V.; McSween, Terry E.; Medina, Rixio E.; Rost, Kristen; Alvero, Alicia M.

    2010-01-01

    A values-centered and team-based behavioral safety process was implemented in a petroleum oil refinery. Employee teams defined the refinery's safety values and related practices, which were used to guide the process design and implementation. The process included (a) a safety assessment; (b) the clarification of safety-related values and related…

  5. Chemical Processing Department monthly report, September 1956

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1956-10-18

    The September, 1956 monthly report for the Chemical Processing Department of Hanford Atomic Products Operation includes information regarding research and engineering efforts with respect to the Purex and Redox process technology. Also discussed is the production operation, finished products operation, power and general maintenance, financial operation, engineering and research operations, and employee operations. (MB)

  6. Chemical Processing Department monthly report, November 1957

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1957-12-23

    The November, 1957 monthly report for the Chemical Processing Department of the Hanford Atomic Products Operation includes information regarding research and engineering efforts with respect to the Purex and Redox process technology. Also discussed is the production operation, finished product operation, power and general maintenance, financial operation, engineering and research operations, and employee operation. (MB)

  7. Applying Lean to the AC-130 Maintenance Process for the Royal Saudi Air Force

    DTIC Science & Technology

    2016-09-01

    inventory management. Quality Management Poor quality of maintenance contributes to rework , which is an obvious form of waste. It would be very...consequences of rework are very significant. Within the C-130 maintenance squadron, quality must be achieved through continual process improvements, rather...maintenance “product” quality by lowering measurable process outputs such as amount of rework , number of maintenance-induced failures, and so on. 71

  8. Process Evaluation of an Effective Church-Based Diet Intervention: Body & Soul

    ERIC Educational Resources Information Center

    Campbell, Marci Kramish; Resnicow, Ken; Carr, Carol; Wang, Terry; Williams, Alexis

    2007-01-01

    Body & Soul has demonstrated effectiveness as a dietary intervention among African American church members. The process evaluation assessed relationships between program exposure and implementation factors and study outcomes and characterized factors important for adoption, implementation, and maintenance. Data sources included participant surveys…

  9. 30 CFR 48.22 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... underground mine and who is engaged in the extraction and production process, or engaged in shaft or slope... and blasters, who are engaged in the extraction and production process or engaged in shaft or slope... surface mine, including any delivery, office, or scientific worker or occasional, short-term maintenance...

  10. Space Station crew workload - Station operations and customer accommodations

    NASA Technical Reports Server (NTRS)

    Shinkle, G. L.

    1985-01-01

    The features of the Space Station which permit crew members to utilize work time for payload operations are discussed. The user orientation, modular design, nonstressful flight regime, in space construction, on board control, automation and robotics, and maintenance and servicing of the Space Station are examined. The proposed crew size, skills, and functions as station operator and mission specialists are described. Mission objectives and crew functions, which include performing material processing, life science and astronomy experiments, satellite and payload equipment servicing, systems monitoring and control, maintenance and repair, Orbital Maneuvering Vehicle and Mobile Remote Manipulator System operations, on board planning, housekeeping, and health maintenance and recreation, are studied.

  11. Memory plasticity in older adults: Cognitive predictors of training response and maintenance following learning of number-consonant mnemonic.

    PubMed

    Sandberg, Petra; Rönnlund, Michael; Derwinger-Hallberg, Anna; Stigsdotter Neely, Anna

    2016-10-01

    The study investigated the relationship between cognitive factors and gains in number recall following training in a number-consonant mnemonic in a sample of 112 older adults (M = 70.9 years). The cognitive factors examined included baseline episodic memory, working memory, processing speed, and verbal knowledge. In addition, predictors of maintenance of gains to a follow-up assessment, eight months later, were examined. Whereas working memory was a prominent predictor of baseline recall, the magnitude of gains in recall from pre- to post-test assessments were predicted by baseline episodic memory, processing speed, and verbal knowledge. Verbal knowledge was the only significant predictor of maintenance. Collectively, the results indicate the need to consider multiple factors to account for individual differences in memory plasticity. The potential contribution of additional factors to individual differences in memory plasticity is discussed.

  12. High temperature process steam application at the Southern Union Refining Company, Hobbs, New Mexico. Solar energy in the oil patch. Final report, Phase III: operation, maintenance, and performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, L.E.; McGuire, D.R.

    1984-05-01

    This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly totalmore » than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.« less

  13. Visualization of Big Data Through Ship Maintenance Metrics Analysis for Fleet Maintenance and Revitalization

    DTIC Science & Technology

    2014-03-01

    BIG DATA THROUGH SHIP MAINTENANCE METRICS ANALYSIS FOR FLEET MAINTENANCE AND REVITALIZATION by Isaac J. Donaldson March 2014 Thesis...March 2014 3. REPORT TYPE AND DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE VISUALIZATION OF BIG DATA THROUGH SHIP MAINTENANCE METRICS...terms of the overall performance of ship maintenance processes is clearly a big data problem. The current process for presenting data on the more than

  14. Partial maintenance of auditory-based cognitive training benefits in older adults

    PubMed Central

    Anderson, Samira; White-Schwoch, Travis; Choi, Hee Jae; Kraus, Nina

    2014-01-01

    The potential for short-term training to improve cognitive and sensory function in older adults has captured the public’s interest. Initial results have been promising. For example, eight weeks of auditory-based cognitive training decreases peak latencies and peak variability in neural responses to speech presented in a background of noise and instills gains in speed of processing, speech-in-noise recognition, and short-term memory in older adults. But while previous studies have demonstrated short-term plasticity in older adults, we must consider the long-term maintenance of training gains. To evaluate training maintenance, we invited participants from an earlier training study to return for follow-up testing six months after the completion of training. We found that improvements in response peak timing to speech in noise and speed of processing were maintained, but the participants did not maintain speech-in-noise recognition or memory gains. Future studies should consider factors that are important for training maintenance, including the nature of the training, compliance with the training schedule, and the need for booster sessions after the completion of primary training. PMID:25111032

  15. Facultative Lagoons. Student Manual. Biological Treatment Process Control.

    ERIC Educational Resources Information Center

    Andersen, Lorri

    The textual material for a unit on facultative lagoons is presented in this student manual. Topic areas discussed include: (1) loading; (2) microbial theory; (3) structure and design; (4) process control; (5) lagoon start-up; (6) data handling and analysis; (7) lagoon maintenance (considering visual observations, pond structure, safety, odor,…

  16. Development of a Prototype H-46 Helicopter Diagnostic Expert System.

    DTIC Science & Technology

    1987-09-01

    SQUADRON MAINTEN\\NCE: CURRENT PROCESS AND CA D S INTEG R ,ATIO N ........................................ 14 A. MAINTENANCE DATA SYSTEM...increasce the effectiveness of the maintenance process should enhance the ability of achieving :hee objectives. Artificial intelligence techniques offer a...completeiy validated. G. ORGANIZATION OF STUDY Chapter II contains a description of the Naval Aviation Maintenance Program’s Maintenance Data System (MDS

  17. Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fresco, A.; Subudhi, M.; Gunther, W.

    1993-12-01

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance,more » Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.« less

  18. Scheduling with non-decreasing deterioration jobs and variable maintenance activities on a single machine

    NASA Astrophysics Data System (ADS)

    Zhang, Xingong; Yin, Yunqiang; Wu, Chin-Chia

    2017-01-01

    There is a situation found in many manufacturing systems, such as steel rolling mills, fire fighting or single-server cycle-queues, where a job that is processed later consumes more time than that same job when processed earlier. The research finds that machine maintenance can improve the worsening of processing conditions. After maintenance activity, the machine will be restored. The maintenance duration is a positive and non-decreasing differentiable convex function of the total processing times of the jobs between maintenance activities. Motivated by this observation, the makespan and the total completion time minimization problems in the scheduling of jobs with non-decreasing rates of job processing time on a single machine are considered in this article. It is shown that both the makespan and the total completion time minimization problems are NP-hard in the strong sense when the number of maintenance activities is arbitrary, while the makespan minimization problem is NP-hard in the ordinary sense when the number of maintenance activities is fixed. If the deterioration rates of the jobs are identical and the maintenance duration is a linear function of the total processing times of the jobs between maintenance activities, then this article shows that the group balance principle is satisfied for the makespan minimization problem. Furthermore, two polynomial-time algorithms are presented for solving the makespan problem and the total completion time problem under identical deterioration rates, respectively.

  19. Data collection system: Earth Resources Technology Satellite-1

    NASA Technical Reports Server (NTRS)

    Cooper, S. (Editor); Ryan, P. T. (Editor)

    1975-01-01

    Subjects covered at the meeting concerned results on the overall data collection system including sensors, interface hardware, power supplies, environmental enclosures, data transmission, processing and distribution, maintenance and integration in resources management systems.

  20. Safety in the Chemical Laboratory: Fire Safety and Fire Control in the Chemistry Laboratory.

    ERIC Educational Resources Information Center

    Wilbraham, A. C.

    1979-01-01

    Discusses fire safety and fire control in the chemistry laboratory. The combustion process, extinguishing equipment, extinguisher maintenance and location, and fire safety and practices are included. (HM)

  1. Degradation modeling of mid-power white-light LEDs by using Wiener process.

    PubMed

    Huang, Jianlin; Golubović, Dušan S; Koh, Sau; Yang, Daoguo; Li, Xiupeng; Fan, Xuejun; Zhang, G Q

    2015-07-27

    The IES standard TM-21-11 provides a guideline for lifetime prediction of LED devices. As it uses average normalized lumen maintenance data and performs non-linear regression for lifetime modeling, it cannot capture dynamic and random variation of the degradation process of LED devices. In addition, this method cannot capture the failure distribution, although it is much more relevant in reliability analysis. Furthermore, the TM-21-11 only considers lumen maintenance for lifetime prediction. Color shift, as another important performance characteristic of LED devices, may also render significant degradation during service life, even though the lumen maintenance has not reached the critical threshold. In this study, a modified Wiener process has been employed for the modeling of the degradation of LED devices. By using this method, dynamic and random variations, as well as the non-linear degradation behavior of LED devices, can be easily accounted for. With a mild assumption, the parameter estimation accuracy has been improved by including more information into the likelihood function while neglecting the dependency between the random variables. As a consequence, the mean time to failure (MTTF) has been obtained and shows comparable result with IES TM-21-11 predictions, indicating the feasibility of the proposed method. Finally, the cumulative failure distribution was presented corresponding to different combinations of lumen maintenance and color shift. The results demonstrate that a joint failure distribution of LED devices could be modeled by simply considering their lumen maintenance and color shift as two independent variables.

  2. Applying Lean to the F-15 Maintenance Process for the Royal Saudi Air Force

    DTIC Science & Technology

    2014-03-01

    Royal Saudi Air Force. The research focuses on improving the F-15 maintenance process in the Royal Saudi Air Force’s Maintenance Squadrons. The F-15...and on the aircraft age condition, the researcher concludes it is time to get rid of some obstacles and use new management techniques to resolve the...processes? Research Focus This research is focusing on the Royal Saudi Air Force F-15 maintenance process. Because of the time and

  3. Mechatronics technology in predictive maintenance method

    NASA Astrophysics Data System (ADS)

    Majid, Nurul Afiqah A.; Muthalif, Asan G. A.

    2017-11-01

    This paper presents recent mechatronics technology that can help to implement predictive maintenance by combining intelligent and predictive maintenance instrument. Vibration Fault Simulation System (VFSS) is an example of mechatronics system. The focus of this study is the prediction on the use of critical machines to detect vibration. Vibration measurement is often used as the key indicator of the state of the machine. This paper shows the choice of the appropriate strategy in the vibration of diagnostic process of the mechanical system, especially rotating machines, in recognition of the failure during the working process. In this paper, the vibration signature analysis is implemented to detect faults in rotary machining that includes imbalance, mechanical looseness, bent shaft, misalignment, missing blade bearing fault, balancing mass and critical speed. In order to perform vibration signature analysis for rotating machinery faults, studies have been made on how mechatronics technology is used as predictive maintenance methods. Vibration Faults Simulation Rig (VFSR) is designed to simulate and understand faults signatures. These techniques are based on the processing of vibrational data in frequency-domain. The LabVIEW-based spectrum analyzer software is developed to acquire and extract frequency contents of faults signals. This system is successfully tested based on the unique vibration fault signatures that always occur in a rotating machinery.

  4. Competency-based on-the-job training for aviation maintenance and inspection--a human factors approach.

    PubMed

    Walter, D

    2000-08-01

    More than 90% of the critical skills that an aviation maintenance technician uses are acquired through on-the-job training (OJT). Yet many aviation maintenance technicians rely on a 'degenerating buddy system', 'follow Joe around', or unstructured approach to OJT. Many aspects of the aviation maintenance environment point to the need for a structured OJT program, but perhaps the most significant is the practice of job bidding which can create rapid turnover of technicians. The task analytic training system (TATS), a model for developing team-driven structured OJT was developed by the author, and first introduced in Boeing Commercial Airplane Group to provide competency-based OJT for aviation maintenance and inspection personnel. The goal of the model was not only to provide a comprehensive, highly structured training system that could be applied to any maintenance and inspection task, but also to improve team coordination, attitude and morale. The first goal was accomplished by following the systems eight-step process, the latter through incorporating human factors principles such as decision making, communication, team building and conflict resolution into the process itself. In general, the process helps to instill mutual respect and trust, enhance goal-directed behavior, strengthen technicians' self-esteem and responsiveness to new ideas and encourage technicians to make worthwhile contributions. The theoretical background of the model is addressed by illustrating how the proven training methodologies of job task analysis and job instruction training are blended with human factors principles resulting in a unique team-driven approach to training. The paper discusses major elements of the model including needs identification, outlining targeted jobs, writing and verifying training procedures, an approval system, sequencing of training, certifying trainers, implementing, employing tracking mechanisms, evaluating, and establishing a maintenance/audit plan. Relevance to industry. TATS has been successfully installed in several maintenance and inspection areas of The Boeing Company. Four major U.S. airlines--United Airlines, TransWorld Airlines, Northwest Airlines, and USAirways have participated in two years of development and field testing in their maintenance operations (assisted by the author and Dr. Barbara Kanki of NASA Ames Research Center).

  5. A quantitative comparison of corrective and perfective maintenance

    NASA Technical Reports Server (NTRS)

    Henry, Joel; Cain, James

    1994-01-01

    This paper presents a quantitative comparison of corrective and perfective software maintenance activities. The comparison utilizes basic data collected throughout the maintenance process. The data collected are extensive and allow the impact of both types of maintenance to be quantitatively evaluated and compared. Basic statistical techniques test relationships between and among process and product data. The results show interesting similarities and important differences in both process and product characteristics.

  6. Salience of working-memory maintenance and manipulation deficits in schizophrenia

    PubMed Central

    Hill, S. K.; Griffin, G. B.; Miura, T. Kazuto; Herbener, E. S.; Sweeney, J. A.

    2011-01-01

    Background Encoding and maintenance of information in working memory, followed by internal manipulation of that information for planning adaptive behavior, are two key components of working-memory systems. Both processes have been reported to be impaired in schizophrenia, but few studies have directly compared the relative severity of these abnormalities, or the degree to which manipulation deficits might be secondary to alterations in maintenance processes. Method Clinically stable schizophrenia patients (n=25) and a demographically similar healthy comparison group (n=24) were administered a verbal span task with three levels of working-memory load. Maintenance was assessed using sequential position questions. Manipulation processes were assessed by requiring comparison of the relative sequential position of test items, which entailed simultaneous serial search strategies regarding item order. Results Both groups showed reduced accuracy and increased reaction time for manipulation compared with maintenance processing. There were significant patient impairments across working-memory loads. There was no differential deficit in manipulation processing, and effect sizes of relative deficit in the patient group were higher for maintenance than manipulation processing. Conclusions The strong correlation for maintenance and manipulation deficits suggest that impairments in the ability to internally manipulate information stored in working-memory systems are not greater than alterations in the encoding and maintaining of information in working memory and that disturbances in maintenance processing may contribute to deficits in higher-order working-memory operations. PMID:20214839

  7. The development of memory maintenance: children's use of phonological rehearsal and attentional refreshment in working memory tasks.

    PubMed

    Tam, Helen; Jarrold, Christopher; Baddeley, Alan D; Sabatos-DeVito, Maura

    2010-11-01

    Past research suggests that children begin to phonologically rehearse at around 7 years of age. Less is known regarding the development of refreshment, an attention-based maintenance mechanism. Therefore, the use of these two maintenance methods by 6- and 8-year-olds was assessed using memory span tasks that varied in their opportunities for maintenance activity. Experiment 1 showed that nonverbal processing impaired both groups' performance to similar extents. Experiment 2 employed phonologically similar or dissimilar memory items and compared the effects of verbal versus nonverbal processing on recall. Both groups showed evidence of phonological maintenance under nonverbal processing but not under verbal processing. Furthermore, nonverbal processing again impaired recall. Verbal processing was also more detrimental to performance in 8-year-olds than in 6-year-olds. Together, the results suggest that nonverbal processing impairs recall by obstructing refreshment and that developmental change in maintenance between 6 and 8 years of age consists primarily of an increase in phonological rehearsal. Copyright (c) 2010 Elsevier Inc. All rights reserved.

  8. Qualitative Analysis for Maintenance Process Assessment

    NASA Technical Reports Server (NTRS)

    Brand, Lionel; Kim, Yong-Mi; Melo, Walcelio; Seaman, Carolyn; Basili, Victor

    1996-01-01

    In order to improve software maintenance processes, we first need to be able to characterize and assess them. These tasks must be performed in depth and with objectivity since the problems are complex. One approach is to set up a measurement-based software process improvement program specifically aimed at maintenance. However, establishing a measurement program requires that one understands the problems to be addressed by the measurement program and is able to characterize the maintenance environment and processes in order to collect suitable and cost-effective data. Also, enacting such a program and getting usable data sets takes time. A short term substitute is therefore needed. We propose in this paper a characterization process aimed specifically at maintenance and based on a general qualitative analysis methodology. This process is rigorously defined in order to be repeatable and usable by people who are not acquainted with such analysis procedures. A basic feature of our approach is that actual implemented software changes are analyzed in order to understand the flaws in the maintenance process. Guidelines are provided and a case study is shown that demonstrates the usefulness of the approach.

  9. Understanding and Predicting the Process of Software Maintenance Releases

    NASA Technical Reports Server (NTRS)

    Basili, Victor; Briand, Lionel; Condon, Steven; Kim, Yong-Mi; Melo, Walcelio L.; Valett, Jon D.

    1996-01-01

    One of the major concerns of any maintenance organization is to understand and estimate the cost of maintenance releases of software systems. Planning the next release so as to maximize the increase in functionality and the improvement in quality are vital to successful maintenance management. The objective of this paper is to present the results of a case study in which an incremental approach was used to better understand the effort distribution of releases and build a predictive effort model for software maintenance releases. This study was conducted in the Flight Dynamics Division (FDD) of NASA Goddard Space Flight Center(GSFC). This paper presents three main results: 1) a predictive effort model developed for the FDD's software maintenance release process; 2) measurement-based lessons learned about the maintenance process in the FDD; and 3) a set of lessons learned about the establishment of a measurement-based software maintenance improvement program. In addition, this study provides insights and guidelines for obtaining similar results in other maintenance organizations.

  10. Plant observation report and evaluation, Pennwalt Corporation, secondary and tertiary aliphatic monoamines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-08-27

    A site visit was made to the amine manufacturing facility of the Pennwalt Corporation, Wyandotte, Michigan, to evaluate the facility in regard to the Secondary and Tertiary Aliphatic Monoamines Criteria Document. A total of 21 people were directly in contact with the amine production process. Two to four of the maintenance personnel may also come in contact with the process. Maintenance workers ran the risk of exposure not only to primary, secondary and tertiary amine compounds, but also to several other chemicals being used in the process. The processes used to unload raw materials are described, along with reactor operations,more » decanter and recycling operations, distillation operations, product storage and shipping. Medical monitoring at the facility included chest x-ray, respiratory function tests, sight screening, urinalysis, and back x-rays. Restricted and potentially hazardous area signs were clearly posted. Employees wore hard hats and safety glasses on the job as well as gloves, rubber boots, face shields, goggles, and respirators as necessary. Emergency procedures are described, including fire protection. Sanitation and personal hygiene are discussed, along with monitoring of the workplace conditions.« less

  11. DNA Excision Repair at Telomeres

    PubMed Central

    Jia, Pingping; Her, Chengtao; Chai, Weihang

    2015-01-01

    DNA damage is caused by either endogenous cellular metabolic processes such as hydrolysis, oxidation, alkylation, and DNA base mismatches, or exogenous sources including ultraviolet (UV) light, ionizing radiation, and chemical agents. Damaged DNA that is not properly repaired can lead to genomic instability, driving tumorigenesis. To protect genomic stability, mammalian cells have evolved highly conserved DNA repair mechanisms to remove and repair DNA lesions. Telomeres are composed of long tandem TTAGGG repeats located at the ends of chromosomes. Maintenance of functional telomeres is critical for preventing genome instability. The telomeric sequence possesses unique features that predispose telomeres to a variety of DNA damage induced by environmental genotoxins. This review briefly describes the relevance of excision repair pathways in telomere maintenance, with the focus on base excision repair (BER), nucleotide excision repair (NER), and mismatch repair (MMR). By summarizing current knowledge on excision repair of telomere damage and outlining many unanswered questions, it is our hope to stimulate further interest in a better understanding of excision repair processes at telomeres and in how these processes contribute to telomere maintenance. PMID:26422132

  12. Business Process Reengineering in the Inventory Management to Improve Aircraft Maintenance Operations in the Indonesian Air Force

    DTIC Science & Technology

    2006-06-01

    research will cover an overview of business process engineering (BPR) and operation management . The focus will be on the basic process of BPR, inventory...management and improvement of the process of business operation management to appropriately provide a basic model for the Indonesian Air Force in...discuss the operation management aspects of inventory management and process improvement, including Economic Order Quantity, Material Requirement

  13. Integration of health management and support systems is key to achieving cost reduction and operational concept goals of the 2nd generation reusable launch vehicle

    NASA Astrophysics Data System (ADS)

    Koon, Phillip L.; Greene, Scott

    2002-07-01

    Our aerospace customers are demanding that we drastically reduce the cost of operating and supporting our products. Our space customer in particular is looking for the next generation of reusable launch vehicle systems to support more aircraft like operation. To achieve this goal requires more than an evolution in materials, processes and systems, what is required is a paradigm shift in the design of the launch vehicles and the processing systems that support the launch vehicles. This paper describes the Automated Informed Maintenance System (AIM) we are developing for NASA's Space Launch Initiative (SLI) Second Generation Reusable Launch Vehicle (RLV). Our system includes an Integrated Health Management (IHM) system for the launch vehicles and ground support systems, which features model based diagnostics and prognostics. Health Management data is used by our AIM decision support and process aids to automatically plan maintenance, generate work orders and schedule maintenance activities along with the resources required to execute these processes. Our system will automate the ground processing for a spaceport handling multiple RLVs executing multiple missions. To accomplish this task we are applying the latest web based distributed computing technologies and application development techniques.

  14. Economics

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Tables covering the selling price of hydrogen as a function of each process temperature studied are presented. Estimated selling price, based on capital costs and operating and maintenance costs, is included. In all cases, no credit was given for the methane component of hydrogen.

  15. Building an experience factory for maintenance

    NASA Technical Reports Server (NTRS)

    Valett, Jon D.; Condon, Steven E.; Briand, Lionel; Kim, Yong-Mi; Basili, Victor R.

    1994-01-01

    This paper reports the preliminary results of a study of the software maintenance process in the Flight Dynamics Division (FDD) of the National Aeronautics and Space Administration/Goddard Space Flight Center (NASA/GSFC). This study is being conducted by the Software Engineering Laboratory (SEL), a research organization sponsored by the Software Engineering Branch of the FDD, which investigates the effectiveness of software engineering technologies when applied to the development of applications software. This software maintenance study began in October 1993 and is being conducted using the Quality Improvement Paradigm (QIP), a process improvement strategy based on three iterative steps: understanding, assessing, and packaging. The preliminary results represent the outcome of the understanding phase, during which SEL researchers characterized the maintenance environment, product, and process. Findings indicate that a combination of quantitative and qualitative analysis is effective for studying the software maintenance process, that additional measures should be collected for maintenance (as opposed to new development), and that characteristics such as effort, error rate, and productivity are best considered on a 'release' basis rather than on a project basis. The research thus far has documented some basic differences between new development and software maintenance. It lays the foundation for further application of the QIP to investigate means of improving the maintenance process and product in the FDD.

  16. e-Learning Application for Machine Maintenance Process using Iterative Method in XYZ Company

    NASA Astrophysics Data System (ADS)

    Nurunisa, Suaidah; Kurniawati, Amelia; Pramuditya Soesanto, Rayinda; Yunan Kurnia Septo Hediyanto, Umar

    2016-02-01

    XYZ Company is a company based on manufacturing part for airplane, one of the machine that is categorized as key facility in the company is Millac 5H6P. As a key facility, the machines should be assured to work well and in peak condition, therefore, maintenance process is needed periodically. From the data gathering, it is known that there are lack of competency from the maintenance staff to maintain different type of machine which is not assigned by the supervisor, this indicate that knowledge which possessed by maintenance staff are uneven. The purpose of this research is to create knowledge-based e-learning application as a realization from externalization process in knowledge transfer process to maintain the machine. The application feature are adjusted for maintenance purpose using e-learning framework for maintenance process, the content of the application support multimedia for learning purpose. QFD is used in this research to understand the needs from user. The application is built using moodle with iterative method for software development cycle and UML Diagram. The result from this research is e-learning application as sharing knowledge media for maintenance staff in the company. From the test, it is known that the application make maintenance staff easy to understand the competencies.

  17. Technology management: case study of an integrated health system.

    PubMed

    Dahl, D H; McFarlan, T K

    1994-12-01

    Technology management has assumed a role of vital importance in today's health care environment. Capital reserves and operating income have been stretched by pervasive and expensive technologies, while overall reimbursement has been reduced. It is imperative for hospitals to develop and consistently use technology management processes that begin prior to a technology's introduction in the hospital and continue throughout its life cycle. At Samaritan Health System (SHS), an integrated health care delivery system based in Phoenix, technology management provides tools to improve decision making and assist in the system's integration strategy as well as control expenses. SHS uses a systemwide technology-specific plan to guide acquisition and/or funding decisions. This plan describes how particular technologies can help achieve SHS' organizational goals such as promoting system integration and/or improving patient outcomes while providing good economic value. After technologies are targeted in this systemwide plan they are prioritized using a two-stage capital prioritization process. The first stage of the capital prioritization process considers the quantitative and qualitative factors critical for equitable capital distribution across the system. The second stage develops a sense of ownership among the parties that affect and are affected by the allocation at a facility level. This process promotes an efficient, effective, equitable, and defensible approach to resource allocation and technology decision making. Minimizing equipment maintenance expenditures is also an integral part of technology management at SHS. The keys to reducing maintenance expenditures are having a process in place that supports a routine fiscal evaluation of maintenance coverage options and ensuring that manufacturers are obligated to provide critical maintenance resources at the time of equipment purchase. Maintenance service options under consideration in this report include full-service contracts with the manufacturer, insurance coverage, time and materials, and independent service vendors/in-house support. Careful consideration of all the ramifications of each option is warranted because there are substantial cost differences among these methods. At SHS, technology management efforts resulted in equipment purchases and maintenance negotiations representing savings of more than $1.5 million in a single year. SHS undertakes an intensive review of purchases and maintenance expenditures, using the techniques described in this report, with the objective of reducing expenses by 10% per year. This report describes the technology management methods that SHS uses to achieve these results.

  18. [The formation of the self-maintenance skills in the pre-school children presenting with locomotor and coordination disorders].

    PubMed

    Poletaeva-Dubrovina, N A; Burkova, A M

    2016-01-01

    The Ministry of Health of the Russian Federation acknowledges the sharp rise in the prevalence of congenital malformation in this country during the past 30 years. In 2010-2011, this pathology was estimated to occur in 3% of the children. It includes a variety of locomotor and coordination disorders of which the most widespread are infantile cerebral paralysis, ataxia, consequences of perinatal lesions of the central nervous system, etc. This article contains a detailed description of these locomotor and coordination disorders. The objective of the present work was to elaborate and evaluate the program for the formation of the self-maintenance skills in the pre-school children presenting with locomotor and coordination disorders under conditions of family guidance and education. The study was carried out from September 2013 till May 2014 based at MUP DOD "Semeiny klub Nadezhda" ("The Hope Family Club", Municipal unitary facility for children's additional education) and supported by B.N. El'tsin Ural Federal University. It included 10 children suffering from locomotor and coordination disorders of different severity and members of their families. The following methods were used: the self-service skills scorecard , monitoring formation of the motor skills, and Wilcoxon's T-test. The use of the program based on the cooperation with the children's families allowed to achieve positive dynamics in the patients' conditions. Moreover, 30% of them acquired the full scope of the self-maintenance skills. The most pronounced changes in the motor abilities were apparent in the movements of the upper and lower extremitis, walking, and motion in space. The proposed program for the formation of the self-maintenance skills in the pre-school children presenting with locomotor and coordination disorders proved to be highly efficacious. The study has demonstrated the importance of the parents' involvement in the process of formation of the self-maintenance skills and motor abilities. It is concluded that the formation of the self-maintenance skills and locomotor abilities are two interdependent processes.

  19. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    NASA Astrophysics Data System (ADS)

    Milana; Khan, M. K.; Munive, J. E.

    2014-07-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective.

  20. A Grounded Theory Study of Aircraft Maintenance Technician Decision-Making

    NASA Astrophysics Data System (ADS)

    Norcross, Robert

    Aircraft maintenance technician decision-making and actions have resulted in aircraft system errors causing aircraft incidents and accidents. Aircraft accident investigators and researchers examined the factors that influence aircraft maintenance technician errors and categorized the types of errors in an attempt to prevent similar occurrences. New aircraft technology introduced to improve aviation safety and efficiency incur failures that have no information contained in the aircraft maintenance manuals. According to the Federal Aviation Administration, aircraft maintenance technicians must use only approved aircraft maintenance documents to repair, modify, and service aircraft. This qualitative research used a grounded theory approach to explore the decision-making processes and actions taken by aircraft maintenance technicians when confronted with an aircraft problem not contained in the aircraft maintenance manuals. The target population for the research was Federal Aviation Administration licensed aircraft and power plant mechanics from across the United States. Nonprobability purposeful sampling was used to obtain aircraft maintenance technicians with the experience sought in the study problem. The sample population recruitment yielded 19 participants for eight focus group sessions to obtain opinions, perceptions, and experiences related to the study problem. All data collected was entered into the Atlas ti qualitative analysis software. The emergence of Aircraft Maintenance Technician decision-making themes regarding Aircraft Maintenance Manual content, Aircraft Maintenance Technician experience, and legal implications of not following Aircraft Maintenance Manuals surfaced. Conclusions from this study suggest Aircraft Maintenance Technician decision-making were influenced by experience, gaps in the Aircraft Maintenance Manuals, reliance on others, realizing the impact of decisions concerning aircraft airworthiness, management pressures, and legal concerns related to decision-making. Recommendations included an in-depth systematic review of the Aircraft Maintenance Manuals, development of a Federal Aviation Administration approved standardized Aircraft Maintenance Technician decision-making flow diagram, and implementation of risk based decision-making training. The benefit of this study is to save the airline industry revenue by preventing poor decision-making practices that result in inefficient maintenance actions and aircraft incidents and accidents.

  1. Brain function predictors and outcome of weight loss and weight loss maintenance.

    PubMed

    Szabo-Reed, Amanda N; Breslin, Florence J; Lynch, Anthony M; Patrician, Trisha M; Martin, Laura E; Lepping, Rebecca J; Powell, Joshua N; Yeh, Hung-Wen Henry; Befort, Christie A; Sullivan, Debra; Gibson, Cheryl; Washburn, Richard; Donnelly, Joseph E; Savage, Cary R

    2015-01-01

    Obesity rates are associated with public health consequences and rising health care costs. Weight loss interventions, while effective, do not work for everyone, and weight regain is a significant problem. Eating behavior is influenced by a convergence of processes in the brain, including homeostatic factors and motivational processing that are important contributors to overeating. Initial neuroimaging studies have identified brain regions that respond differently to visual food cues in obese and healthy weight individuals that are positively correlated with reports of hunger in obese participants. While these findings provide mechanisms of overeating, many important questions remain. It is not known whether brain activation patterns change after weight loss, or if they change differentially based on amount of weight lost. Also, little is understood regarding biological processes that contribute to long-term weight maintenance. This study will use neuroimaging in participants while viewing food and non-food images. Functional Magnetic Resonance Imaging will take place before and after completion of a twelve-week weight loss intervention. Obese participants will be followed though a 6-month maintenance period. The study will address three aims: 1. Characterize brain activation underlying food motivation and impulsive behaviors in obese individuals. 2. Identify brain activation changes and predictors of weight loss. 3. Identify brain activation predictors of weight loss maintenance. Findings from this study will have implications for understanding mechanisms of obesity, weight loss, and weight maintenance. Results will be significant to public health and could lead to a better understanding of how differences in brain activation relate to obesity. Copyright © 2014 Elsevier Inc. All rights reserved.

  2. Brain function predictors and outcome of weight loss and weight loss maintenance

    PubMed Central

    Szabo-Reed, Amanda N.; Breslin, Florence J.; Lynch, Anthony M.; Patrician, Trisha M.; Martin, Laura E.; Lepping, Rebecca J.; Powell, Joshua N.; Yeh, Hung-Wen (Henry); Befort, Christie A.; Sullivan, Debra; Gibson, Cheryl; Washburn, Richard; Donnelly, Joseph E.; Savage, Cary R.

    2015-01-01

    Obesity rates are associated with public health consequences and rising health care costs. Weight loss interventions, while effective, do not work for everyone, and weight regain is a significant problem. Eating behavior is influenced by a convergence of processes in the brain, including homeostatic factors and motivational processing that are important contributors to overeating. Initial neuroimaging studies have identified brain regions that respond differently to visual food cues in obese and healthy weight individuals that are positively correlated with reports of hunger in obese participants. While these findings provide mechanisms of overeating, many important questions remain. It is not known whether brain activation patterns change after weight loss, or if they change differentially based on amount of weight lost. Also, little is understood regarding biological processes that contribute to long-term weight maintenance. This study will use neuroimaging in participants while viewing food and non-food images. Functional Magnetic Resonance Imaging will take place before and after completion of a twelve-week weight loss intervention. Obese participants will be followed though a 6-month maintenance period. The study will address three aims: 1. Characterize brain activation underlying food motivation and impulsive behaviors in obese individuals. 2. Identify brain activation changes and predictors of weight loss. 3. Identify brain activation predictors of weight loss maintenance. Findings from this study will have implications for understanding mechanisms of obesity, weight loss, and weight maintenance. Results will be significant to public health and could lead to a better understanding of how differences in brain activation relate to obesity. PMID:25533729

  3. Differential effects of cognitive load on emotion: Emotion maintenance versus passive experience.

    PubMed

    DeFraine, William C

    2016-06-01

    Two separate lines of research have examined the effects of cognitive load on emotional processing with similar tasks but seemingly contradictory results. Some research has shown that the emotions elicited by passive viewing of emotional images are reduced by subsequent cognitive load. Other research has shown that such emotions are not reduced by cognitive load if the emotions are actively maintained. The present study sought to compare and resolve these 2 lines of research. Participants either passively viewed negative emotional images or maintained the emotions elicited by the images, and after a delay rated the intensity of the emotion they were feeling. Half of trials included a math task during the delay to induce cognitive load, and the other half did not. Results showed that cognitive load reduced the intensity of negative emotions during passive-viewing of emotional images but not during emotion maintenance. The present study replicates the findings of both lines of research, and shows that the key factor is whether or not emotions are actively maintained. Also, in the context of previous emotion maintenance research, the present results support the theoretical idea of a separable emotion maintenance process. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  4. Protein kinase M ζ and the maintenance of long-term memory.

    PubMed

    Zhang, Yang; Zong, Wei; Zhang, Lei; Ma, Yuanye; Wang, Jianhong

    2016-10-01

    Although various molecules have been found to mediate the processes of memory acquisition and consolidation, the molecular mechanism to maintain memory still remains elusive. In recent years, a molecular pathway focusing on protein kinase Mζ (PKMζ) has become of interest to researchers because of its potential role in long-term memory maintenance. PKMζ is an isoform of protein kinase C (PKC) and has a related structure that influences its function in maintaining memory. Considerable evidence has been gathered on PKMζ activity, including loss of function studies using PKMζ inhibitors, such as PKMζ inhibitory peptide (ZIP), suggesting PKMζ plays an important role in long-term memory maintenance. This review provides an overview of the role of PKMζ in long-term memory and outlines the molecular structure of PKMζ, the molecular mechanism of PKMζ in long-term memory maintenance and future directions of PKMζ research. Copyright © 2016 Elsevier Ltd. All rights reserved.

  5. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    NASA Astrophysics Data System (ADS)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  6. RMP Guidance for Warehouses - Chapter 6: Prevention Program (Program 2)

    EPA Pesticide Factsheets

    If substances you have above threshold are not covered by OSHA's PSM standard, you have a Program 2 process. Your prevention program must include safety information, hazard review, SOPs, training, maintenance, compliance audits, and incident investigation.

  7. Orientation to Municipal Wastewater Treatment. Training Manual.

    ERIC Educational Resources Information Center

    Office of Water Program Operations (EPA), Cincinnati, OH. National Training and Operational Technology Center.

    Introductory-level material on municipal wastewater treatment facilities and processes is presented. Course topics include sources and characteristics of municipal wastewaters; objectives of wastewater treatment; design, operation, and maintenance factors; performance testing; plant staffing; and laboratory considerations. Chapter topics include…

  8. The Microcomputer and School Transportation.

    ERIC Educational Resources Information Center

    Dembowski, Frederick L.

    1984-01-01

    Microcomputers have many cost- and time-saving uses in school transportation management. Applications include routing and scheduling, demographic analysis, fleet maintenance, and personnel and contract management. Word processing is especially promising for storing and updating documents like specifications. Enrollment forecasting and inventory…

  9. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and develop management information in order to statistically identify and analyze variances from those plans. It will also add credibility to the NASA facilities maintenance budgeting process. The key to a successful maintenance program is the understanding and support of the senior Center managers.

  10. Transmodal comparison of auditory, motor, and visual post-processing with and without intentional short-term memory maintenance.

    PubMed

    Bender, Stephan; Behringer, Stephanie; Freitag, Christine M; Resch, Franz; Weisbrod, Matthias

    2010-12-01

    To elucidate the contributions of modality-dependent post-processing in auditory, motor and visual cortical areas to short-term memory. We compared late negative waves (N700) during the post-processing of single lateralized stimuli which were separated by long intertrial intervals across the auditory, motor and visual modalities. Tasks either required or competed with attention to post-processing of preceding events, i.e. active short-term memory maintenance. N700 indicated that cortical post-processing exceeded short movements as well as short auditory or visual stimuli for over half a second without intentional short-term memory maintenance. Modality-specific topographies pointed towards sensory (respectively motor) generators with comparable time-courses across the different modalities. Lateralization and amplitude of auditory/motor/visual N700 were enhanced by active short-term memory maintenance compared to attention to current perceptions or passive stimulation. The memory-related N700 increase followed the characteristic time-course and modality-specific topography of the N700 without intentional memory-maintenance. Memory-maintenance-related lateralized negative potentials may be related to a less lateralised modality-dependent post-processing N700 component which occurs also without intentional memory maintenance (automatic memory trace or effortless attraction of attention). Encoding to short-term memory may involve controlled attention to modality-dependent post-processing. Similar short-term memory processes may exist in the auditory, motor and visual systems. Copyright © 2010 International Federation of Clinical Neurophysiology. Published by Elsevier Ireland Ltd. All rights reserved.

  11. Maintenance = reuse-oriented software development

    NASA Technical Reports Server (NTRS)

    Basili, Victor R.

    1989-01-01

    Maintenance is viewed as a reuse process. In this context, a set of models that can be used to support the maintenance process is discussed. A high level reuse framework is presented that characterizes the object of reuse, the process for adapting that object for its target application, and the reused object within its target application. Based upon this framework, a qualitative comparison is offered of the three maintenance process models with regard to their strengths and weaknesses and the circumstances in which they are appropriate. To provide a more systematic, quantitative approach for evaluating the appropriateness of the particular maintenance model, a measurement scheme is provided, based upon the reuse framework, in the form of an organized set of questions that need to be answered. To support the reuse perspective, a set of reuse enablers are discussed.

  12. To select the best tool for generating 3D maintenance data and to set the detailed process for obtaining the 3D maintenance data

    NASA Astrophysics Data System (ADS)

    Prashanth, B. N.; Roy, Kingshuk

    2017-07-01

    Three Dimensional (3D) maintenance data provides a link between design and technical documentation creating interactive 3D graphical training and maintenance material. It becomes difficult for an operator to always go through huge paper manuals or come running to the computer for doing maintenance of a machine which makes the maintenance work fatigue. Above being the case, a 3D animation makes maintenance work very simple since, there is no language barrier. The research deals with the generation of 3D maintenance data of any given machine. The best tool for obtaining the 3D maintenance is selected and the tool is analyzed. Using the same tool, a detailed process for extracting the 3D maintenance data for any machine is set. This project aims at selecting the best tool for obtaining 3D maintenance data and to select the detailed process for obtaining 3D maintenance data. 3D maintenance reduces use of big volumes of manuals which creates human errors and makes the work of an operator fatiguing. Hence 3-D maintenance would help in training and maintenance and would increase productivity. 3Dvia when compared with Cortona 3D and Deep Exploration proves to be better than them. 3Dvia is good in data translation and it has the best renderings compared to the other two 3D maintenance software. 3Dvia is very user friendly and it has various options for creating 3D animations. Its Interactive Electronic Technical Publication (IETP) integration is also better than the other two software. Hence 3Dvia proves to be the best software for obtaining 3D maintenance data of any machine.

  13. Marine fog: a review

    USGS Publications Warehouse

    Koračin, Darko; Dorman, Clive E.; Lewis, John M.; Hudson, James G.; Wilcox, Eric M.; Torregrosa, Alicia

    2014-01-01

    The objective of this review is to discuss physical processes over a wide range of spatial scales that govern the formation, evolution, and dissipation of marine fog. We consider marine fog as the collective combination of fog over the open sea along with coastal sea fog and coastal land fog. The review includes a history of sea fog research, field programs, forecasting methods, and detection of sea fog via satellite observations where similarity in radiative properties of fog top and the underlying sea induce further complexity. The main thrust of the study is to provide insight into causality of fog including its initiation, maintenance, and destruction. The interplay between the various physical processes behind the several stages of marine fog is among the most challenging aspects of the problem. An effort is made to identify this interplay between processes that include the microphysics of fog formation and maintenance, the influence of large-scale circulation and precipitation/clouds, radiation, turbulence (air-sea interaction), and advection. The environmental impact of marine fog is also addressed. The study concludes with an assessment of our current knowledge of the phenomenon, our principal areas of ignorance, and future lines of research that hold promise for advances in our understanding.

  14. STS-57 inflight maintenance (IFM) tool tray at Boeing FEPF bench review

    NASA Technical Reports Server (NTRS)

    1993-01-01

    STS-57 inflight maintenance (IFM) tool tray is displayed on a table top during the bench review at Boeing's Flight Equipment Processing Facility (FEPF) located near JSC. The tool tray will be located on Endeavour's, Orbiter Vehicle (OV) 105's, middeck in forward locker MF57K and includes pinch bar, deadblow hammer, punch, inspection mirror, speed handle assembly, robbins wrench, adjustable wrench, vise grips, connector pliers, ACCU bypass connector, connector strap wrench, locker tool, and mechanical fingers. Photo taken by NASA JSC contract photographer Benny Benavides.

  15. Maintenance manager's manual for small transit agencies. Special report 1985-1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fowler, W.

    1988-03-01

    This publication contains information to assist operators of transit agencies providing public transportation in rural and smaller urban areas to better manage their vehicle maintenance programs. The report includes discussions of maintenance management, maintenance programs preventive maintenance, recordkeeping, selection of type of maintenance operation, in-house maintenance, and maintenance practices. Also included are appendixes giving supplementary information about tire loads; lubrication oil; mechanic hand tools; shop tools; mechanic aptitude tests; technical training resources; maintenance management training resources; and lists of manufacturers of air-conditioning systems, wheelchair lifts and wheelchair ramps.

  16. Weighty Research.

    ERIC Educational Resources Information Center

    Conklin, Aaron R.

    1999-01-01

    Discusses the selection process for weight-training machines that are user-friendly and provide the best fit for the training facility. Machine factors to consider include ease of maintenance, adjustability, ease of use, its biomechanics, structural strength, the upholstery and finish used, and its safety. (GR)

  17. Implementation of sustainable and green design and construction practices for bridges.

    DOT National Transportation Integrated Search

    2012-12-01

    The focus of this research is to develop a framework for more sustainable design and construction : processes for new bridges, and sustainable maintenance practices for existing bridges. The framework : includes a green rating system for bridges. The...

  18. High-temperature pump-motor assembly

    NASA Technical Reports Server (NTRS)

    Colker, C.; Waldron, W.

    1971-01-01

    Assembly pumps liquid sodium-potassium /NaK/ eutectic at 950 K for up to 20,000 hours. Design features include - high operating-temperature capability, zero leakage, process fluid lubricant/coolant, insulation system compatible with ionizing radiation environments, and reliability and long life without maintenance.

  19. The micronutrient genomics project: a community-driven knowledge base for micronutrient research

    USDA-ARS?s Scientific Manuscript database

    Micronutrients influence multiple metabolic pathways including oxidative and inflammatory processes. Optimum micronutrient supply is important for the maintenance of homeostasis in metabolism and, ultimately, for maintaining good health. With advances in systems biology and genomics technologies, it...

  20. Advanced technologies for maintenance of electrical systems and equipment at the Savannah River Site Defense Waste Processing Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Husler, R.O.; Weir, T.J.

    1991-01-01

    An enhanced maintenance program is being established to characterize and monitor cables, components, and process response at the Savannah River Site, Defense Waste Processing Facility. This facility was designed and constructed to immobilize the radioactive waste currently stored in underground storage tanks and is expected to begin operation in 1993. The plant is initiating the program to baseline and monitor instrument and control (I C) and electrical equipment, remote process equipment, embedded instrument and control cables, and in-cell jumper cables used in the facility. This program is based on the electronic characterization and diagnostic (ECAD) system which was modified tomore » include process response analysis and to meet rigid Department of Energy equipment requirements. The system consists of computer-automated, state-of-the-art electronics. The data that are gathered are stored in a computerized database for analysis, trending, and troubleshooting. It is anticipated that the data which are gathered and trended will aid in life extension for the facility.« less

  1. Modeling of ETL-Processes and Processed Information in Clinical Data Warehousing.

    PubMed

    Tute, Erik; Steiner, Jochen

    2018-01-01

    Literature describes a big potential for reuse of clinical patient data. A clinical data warehouse (CDWH) is a means for that. To support management and maintenance of processes extracting, transforming and loading (ETL) data into CDWHs as well as to ease reuse of metadata between regular IT-management, CDWH and secondary data users by providing a modeling approach. Expert survey and literature review to find requirements and existing modeling techniques. An ETL-modeling-technique was developed extending existing modeling techniques. Evaluation by exemplarily modeling existing ETL-process and a second expert survey. Nine experts participated in the first survey. Literature review yielded 15 included publications. Six existing modeling techniques were identified. A modeling technique extending 3LGM2 and combining it with openEHR information models was developed and evaluated. Seven experts participated in the evaluation. The developed approach can help in management and maintenance of ETL-processes and could serve as interface between regular IT-management, CDWH and secondary data users.

  2. Crew interface specifications development functions, phase 3A

    NASA Technical Reports Server (NTRS)

    Carl, J. G.

    1973-01-01

    The findings and data products developed during the crew interface specification study for inflight maintenance and stowage functions are presented. Guidelines are provided for improving the present progress of defining, controlling, and managing the flight crew requirements. The following data products were developed: (1) description of inflight maintenance management process, (2) specifications for inflight maintenance management requirements, and (3) suggested inflight maintenance data processing reports for logistics management.

  3. Buying Into Maintenance.

    ERIC Educational Resources Information Center

    May, Abigail

    1998-01-01

    Describes how educational institutions are recognizing the short-sightedness of deferred maintenance. Discusses the challenges facing schools as they confront maintenance costs and what they must do to address the problem. Offers advice on proactive stances toward maintenance such as computerized work control processes, maintenance zones, and…

  4. [Development of Hospital Equipment Maintenance Information System].

    PubMed

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis.

  5. Language repetition and short-term memory: an integrative framework.

    PubMed

    Majerus, Steve

    2013-01-01

    Short-term maintenance of verbal information is a core factor of language repetition, especially when reproducing multiple or unfamiliar stimuli. Many models of language processing locate the verbal short-term maintenance function in the left posterior superior temporo-parietal area and its connections with the inferior frontal gyrus. However, research in the field of short-term memory has implicated bilateral fronto-parietal networks, involved in attention and serial order processing, as being critical for the maintenance and reproduction of verbal sequences. We present here an integrative framework aimed at bridging research in the language processing and short-term memory fields. This framework considers verbal short-term maintenance as an emergent function resulting from synchronized and integrated activation in dorsal and ventral language processing networks as well as fronto-parietal attention and serial order processing networks. To-be-maintained item representations are temporarily activated in the dorsal and ventral language processing networks, novel phoneme and word serial order information is proposed to be maintained via a right fronto-parietal serial order processing network, and activation in these different networks is proposed to be coordinated and maintained via a left fronto-parietal attention processing network. This framework provides new perspectives for our understanding of information maintenance at the non-word-, word- and sentence-level as well as of verbal maintenance deficits in case of brain injury.

  6. Language repetition and short-term memory: an integrative framework

    PubMed Central

    Majerus, Steve

    2013-01-01

    Short-term maintenance of verbal information is a core factor of language repetition, especially when reproducing multiple or unfamiliar stimuli. Many models of language processing locate the verbal short-term maintenance function in the left posterior superior temporo-parietal area and its connections with the inferior frontal gyrus. However, research in the field of short-term memory has implicated bilateral fronto-parietal networks, involved in attention and serial order processing, as being critical for the maintenance and reproduction of verbal sequences. We present here an integrative framework aimed at bridging research in the language processing and short-term memory fields. This framework considers verbal short-term maintenance as an emergent function resulting from synchronized and integrated activation in dorsal and ventral language processing networks as well as fronto-parietal attention and serial order processing networks. To-be-maintained item representations are temporarily activated in the dorsal and ventral language processing networks, novel phoneme and word serial order information is proposed to be maintained via a right fronto-parietal serial order processing network, and activation in these different networks is proposed to be coordinated and maintained via a left fronto-parietal attention processing network. This framework provides new perspectives for our understanding of information maintenance at the non-word-, word- and sentence-level as well as of verbal maintenance deficits in case of brain injury. PMID:23874280

  7. A case-control study of lung cancer among refinery workers.

    PubMed

    Rosamilia, K; Wong, O; Raabe, G K

    1999-12-01

    This case-control study examined the relationship between lung cancer and the work histories of male employees at a large Texas refinery. The study included 112 lung cancer deaths observed between 1946 and 1987 and 490 matched controls. Employment histories were obtained from personnel records, and smoking information was available from medical records. Both stratification methods and conditional logistic regression were used in data analyses. Overall employment in four general job categories (administrative, engineering/laboratory, process, maintenance/mechanical) was not associated with lung cancer mortality. Results by hire period (< 1940, 1940+) showed that workers hired into process jobs before 1940 had a nonsignificantly elevated odds ratio (OR) of 1.71 (95% confidence interval [CI] = 0.85-3.45) compared with nonprocess workers hired before 1940. Among process workers hired before 1940, there was a significant trend toward increasing OR with increasing duration of employment in process jobs, and the association with lung cancer was strongest among smokers in the highest duration category of 30+ years (OR = 2.98, 95% CI = 1.07-8.31). Latency analyses of process workers hired before 1940 indicated that their lung cancer risk had peaked between 30 and 50 years since first employment. Definitive statements about causal factors are limited because results among process workers were based on small numbers of subjects in some exposure categories, and there was no information on specific workplace exposures. The OR for maintenance/mechanical jobs after adjustment for smoking was 1.00 (95% CI = 0.55-1.82). Furthermore, there was no pattern in relation to duration of employment in maintenance/mechanical jobs. The results from this study do not support the hypothesis that work in maintenance/mechanical jobs increases lung cancer risk. On the basis of analyses in this study, it is unlikely that asbestos exposure contributed to excess lung cancer mortality. Additional analyses were conducted for specific maintenance jobs with potential exposure to asbestos and by duration in jobs with occasional or routine asbestos exposure. No significant increase in lung cancer was found in any subgroup. Furthermore, there was no significant trend toward lung cancer risk in relation to duration of employment in jobs with asbestos exposure.

  8. 77 FR 10662 - Guidance for Industry: Questions and Answers Regarding Establishment and Maintenance of Records...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... Records by Persons Who Manufacture, Process, Pack, Transport, Distribute, Receive, Hold, or Import Food... ``Questions and Answers Regarding Establishment and Maintenance of Records by Persons Who Manufacture, Process... updated information pertaining to the establishment and maintenance of records by persons who manufacture...

  9. Flexibility within working memory and the focus of attention for sequential verbal information does not depend on active maintenance.

    PubMed

    Sandry, Joshua; Schwark, Jeremy D; MacDonald, Justin

    2014-10-01

    The focus of attention seems to be a static element within working memory when verbal information is serially presented, unless additional time is available for processing or active maintenance. Experiment 1 manipulated the reward associated with early and medial list positions in a probe recognition paradigm and found evidence that these nonterminal list positions could be retrieved faster and more accurately if participants were appropriately motivated-without additional time for processing or active maintenance. Experiment 2 used articulatory suppression and demonstrated that the underlying maintenance mechanism cannot be attributed to rehearsal, leaving attentional refreshing as the more likely mechanism. These findings suggest that the focus of attention within working memory can flexibly maintain nonterminal early and medial list representations at the expense of other list representations even when there is not additional time for processing or active maintenance. Maintenance seems to be accomplished through an attentional refreshing mechanism.

  10. Male veterans with PTSD exhibit aberrant neural dynamics during working memory processing: an MEG study

    PubMed Central

    McDermott, Timothy J.; Badura-Brack, Amy S.; Becker, Katherine M.; Ryan, Tara J.; Khanna, Maya M.; Heinrichs-Graham, Elizabeth; Wilson, Tony W.

    2016-01-01

    Background Posttraumatic stress disorder (PTSD) is associated with executive functioning deficits, including disruptions in working memory. In this study, we examined the neural dynamics of working memory processing in veterans with PTSD and a matched healthy control sample using magnetoencephalography (MEG). Methods Our sample of recent combat veterans with PTSD and demographically matched participants without PTSD completed a working memory task during a 306-sensor MEG recording. The MEG data were preprocessed and transformed into the time-frequency domain. Significant oscillatory brain responses were imaged using a beamforming approach to identify spatiotemporal dynamics. Results Fifty-one men were included in our analyses: 27 combat veterans with PTSD and 24 controls. Across all participants, a dynamic wave of neural activity spread from posterior visual cortices to left frontotemporal regions during encoding, consistent with a verbal working memory task, and was sustained throughout maintenance. Differences related to PTSD emerged during early encoding, with patients exhibiting stronger α oscillatory responses than controls in the right inferior frontal gyrus (IFG). Differences spread to the right supramarginal and temporal cortices during later encoding where, along with the right IFG, they persisted throughout the maintenance period. Limitations This study focused on men with combat-related PTSD using a verbal working memory task. Future studies should evaluate women and the impact of various traumatic experiences using diverse tasks. Conclusion Posttraumatic stress disorder is associated with neurophysiological abnormalities during working memory encoding and maintenance. Veterans with PTSD engaged a bilateral network, including the inferior prefrontal cortices and supramarginal gyri. Right hemispheric neural activity likely reflects compensatory processing, as veterans with PTSD work to maintain accurate performance despite known cognitive deficits associated with the disorder. PMID:26645740

  11. A Business Process Analysis of the Surface Navys Depot Maintenance Program

    DTIC Science & Technology

    2015-12-01

    levels of maintenance and the ways in which the Navy employs these types of maintenance to accomplish the objective of sustaining the surface fleet...stripping it of inefficiencies to ensure there is no wasted movement. Toyota , Honda, and their Japanese counterparts championed the lean process and...are another way trust is built, because they cultivate the relationships necessary for process improvement and innovation. JSPs have career

  12. A Business Process Analysis of the Surface Navys Depot Maintenance Program

    DTIC Science & Technology

    2015-12-01

    In this section, I provide a breakdown of the levels of maintenance and the ways in which the Navy employs these types of maintenance to accomplish...of inefficiencies to ensure there is no wasted movement. Toyota , Honda, and their Japanese counterparts championed the lean process and served as...are another way trust is built, because they cultivate the relationships necessary for process improvement and innovation. JSPs have career

  13. Autonomous spacecraft maintenance study group

    NASA Technical Reports Server (NTRS)

    Marshall, M. H.; Low, G. D.

    1981-01-01

    A plan to incorporate autonomous spacecraft maintenance (ASM) capabilities into Air Force spacecraft by 1989 is outlined. It includes the successful operation of the spacecraft without ground operator intervention for extended periods of time. Mechanisms, along with a fault tolerant data processing system (including a nonvolatile backup memory) and an autonomous navigation capability, are needed to replace the routine servicing that is presently performed by the ground system. The state of the art fault handling capabilities of various spacecraft and computers are described, and a set conceptual design requirements needed to achieve ASM is established. Implementations for near term technology development needed for an ASM proof of concept demonstration by 1985, and a research agenda addressing long range academic research for an advanced ASM system for 1990s are established.

  14. Machine Maintenance Scheduling with Reliability Engineering Method and Maintenance Value Stream Mapping

    NASA Astrophysics Data System (ADS)

    Sembiring, N.; Nasution, A. H.

    2018-02-01

    Corrective maintenance i.e replacing or repairing the machine component after machine break down always done in a manufacturing company. It causes the production process must be stopped. Production time will decrease due to the maintenance team must replace or repair the damage machine component. This paper proposes a preventive maintenance’s schedule for a critical component of a critical machine of an crude palm oil and kernel company due to increase maintenance efficiency. The Reliability Engineering & Maintenance Value Stream Mapping is used as a method and a tool to analize the reliability of the component and reduce the wastage in any process by segregating value added and non value added activities.

  15. 30 CFR 48.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... working in an underground mine, including any delivery, office, or scientific worker or occasional, short... service worker employed by the operator or a maintenance or service worker contracted by the operator to... workers, such as drillers and blasters, who are engaged in the extraction and production process or...

  16. 30 CFR 48.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... working in an underground mine, including any delivery, office, or scientific worker or occasional, short... service worker employed by the operator or a maintenance or service worker contracted by the operator to... workers, such as drillers and blasters, who are engaged in the extraction and production process or...

  17. 30 CFR 48.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... working in an underground mine, including any delivery, office, or scientific worker or occasional, short... service worker employed by the operator or a maintenance or service worker contracted by the operator to... workers, such as drillers and blasters, who are engaged in the extraction and production process or...

  18. 30 CFR 48.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... working in an underground mine, including any delivery, office, or scientific worker or occasional, short... service worker employed by the operator or a maintenance or service worker contracted by the operator to... workers, such as drillers and blasters, who are engaged in the extraction and production process or...

  19. Handwriting Fluency and Visuospatial Generativity at Primary School

    ERIC Educational Resources Information Center

    Stievano, Paolo; Michetti, Silvia; McClintock, Shawn M.; Levi, Gabriel; Scalisi, Teresa Gloria

    2016-01-01

    Handwriting is a complex activity that involves continuous interaction between lowerlevel perceptual-motor and higher-level cognitive processes. All handwriting models describe involvement of executive functions (EF) in handwriting development. Particular EF domains associated with handwriting include maintenance of information in working memory,…

  20. High speed ground penetrating radar for road pavement and bridge structural inspection and maintenance : final report.

    DOT National Transportation Integrated Search

    2016-06-30

    The overarching objective of this research is the development of a systematic methodology of employing GPR, including instruments, subsequent data processing and interpretation that can be used regularly as part of a roadway pavement and bridge evalu...

  1. A catalog of graphic symbols used at maintenance control centers : toward a symbol standardization process.

    DOT National Transportation Integrated Search

    2002-04-01

    This document catalogs the symbols presented with the various interfaces used by Federal Aviation Administration Airway Facilities specialists. It includes a high-level overview of each system and the symbols and coding conventions used. These data w...

  2. Mechanism-based testing strategy using in vitro approaches for identification of thyroid hormone disrupting chemicals

    EPA Science Inventory

    The thyroid hormone (TH) system is involved in several important physiological processes, including regulation of energy metabolism, growth and differentiation, development and maintenance of brain function, thermo-regulation, osmo-regulation, and axis of regulation of other endo...

  3. Beyond reliability to profitability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bond, T.H.; Mitchell, J.S.

    1996-07-01

    Reliability concerns have controlled much of power generation design and operations. Emerging from a strictly regulated environment, profitability is becoming a much more important concept for today`s power generation executives. This paper discusses the conceptual advance-view power plant maintenance as a profit center, go beyond reliability, and embrace profitability. Profit Centered Maintenance begins with the premise that financial considerations, namely profitability, drive most aspects of modern process and manufacturing operations. Profit Centered Maintenance is a continuous process of reliability and administrative improvement and optimization. For the power generation executives with troublesome maintenance programs, Profit Centered Maintenance can be the blueprintmore » to increased profitability. It requires the culture change to make decisions based on value, to reengineer the administration of maintenance, and to enable the people performing and administering maintenance to make the most of available maintenance information technology. The key steps are to optimize the physical function of maintenance and to resolve recurring maintenance problems so that the need for maintenance can be reduced. Profit Centered Maintenance is more than just an attitude it is a path to profitability, be it resulting in increased profits or increased market share.« less

  4. Control of Technology Transfer at JPL

    NASA Technical Reports Server (NTRS)

    Oliver, Ronald

    2006-01-01

    Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

  5. Organize to manage reliability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ricketts, R.

    An analysis of maintenance costs in hydrocarbon processing industry (HPI) plants has revealed that attitudes and practices of personnel are the major single bottom line factor. In reaching this conclusion, Solomon Associates examined comparative analysis of plant records over the past decade. The authors learned that there was a wide range of performance independent of refinery age, capacity, processing complexity, and location. Facilities of all extremes in these attributes are included in both high-cost and low-cost categories. Those in the lowest quartile of performance posted twice the resource consumption as the best quartile. Furthermore, there was almost no similarity betweenmore » refineries within a single company. The paper discusses cost versus availability, maintenance spending, two organizational approaches used (repair focused and reliability focused), and organizational style and structure.« less

  6. Reliability based fatigue design and maintenance procedures

    NASA Technical Reports Server (NTRS)

    Hanagud, S.

    1977-01-01

    A stochastic model has been developed to describe a probability for fatigue process by assuming a varying hazard rate. This stochastic model can be used to obtain the desired probability of a crack of certain length at a given location after a certain number of cycles or time. Quantitative estimation of the developed model was also discussed. Application of the model to develop a procedure for reliability-based cost-effective fail-safe structural design is presented. This design procedure includes the reliability improvement due to inspection and repair. Methods of obtaining optimum inspection and maintenance schemes are treated.

  7. Going Paperless

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Sentel Corporation has commercialized NASA's Electronic Portable Information Collection (EPIC) System, which stemmed from a NASA Kennedy Space Center SBIR contract. NASA and Sentel designed, built, and tested work authorization procedures used as a paperless procedures system for Space Shuttle and International Space Station payload processing operations. EPIC is now being applied to various markets including; airplane maintenance, aerospace system data management, shipbuilding industries, shipping industries, law enforcement agencies, and public utilities. KSC is planning a pilot program to use EPIC at the Hypergol Maintenance Facility. In addition, Ames Research Center and KSC are working together to apply EPIC to the area of wireless communication.

  8. Crew considerations in the design for Space Station Freedom modules on-orbit maintenance

    NASA Technical Reports Server (NTRS)

    Stokes, Jack W.; Williams, Katherine A.

    1992-01-01

    The paper presents an approach to the maintenance process currently planned for the Space Station Freedom modules. In particular, it describes the planned crew interfaces with maintenance items, and the anticipated implications for the crew in performing the interior and exterior maintenance of modules developed by U.S., ESA, and NASDA. Special consideration is given to the maintenance requirements, allocations, and approach; the maintenance design; the Maintenance Workstation; the robotic mechanisms; and the developemnt of maintenance techniques.

  9. Coordination and organization of security software process for power information application environment

    NASA Astrophysics Data System (ADS)

    Wang, Qiang

    2017-09-01

    As an important part of software engineering, the software process decides the success or failure of software product. The design and development feature of security software process is discussed, so is the necessity and the present significance of using such process. Coordinating the function software, the process for security software and its testing are deeply discussed. The process includes requirement analysis, design, coding, debug and testing, submission and maintenance. In each process, the paper proposed the subprocesses to support software security. As an example, the paper introduces the above process into the power information platform.

  10. Facultative Lagoons. Instructor's Guide. Biological Treatment Process Control.

    ERIC Educational Resources Information Center

    Andersen, Lorri

    This instructor's guide contains materials needed to teach a two-lesson unit on the structure and components of facultative lagoons, the biological theory of their operation, and factors affecting their operation. Control testing recommendations, maintenance guidelines, and troubleshooting hints are also provided. These materials include: (1) an…

  11. Projecting Labor Requirements for Transportation-Related Construction. Final Report.

    ERIC Educational Resources Information Center

    Washington Technical Inst., Washington, DC. Center for Urban Services.

    This report examines the urban transportation planning process and its labor market impact, including projections of opportunities for minority participation in construction, operation, and maintenance of a transportation system and forecasts of training needed in critical occupations. It was found that transportation-related construction may be…

  12. Summaries of "You Do It" Activities Presented at the 1978 SASTA Conference in the Riverland.

    ERIC Educational Resources Information Center

    Walsh, Terry

    1980-01-01

    Summarizes "you do it" activities presented at the 1978 South Australian Science Teachers Association Conference. Topics include microscope use and maintenance, chemical slide cells, chemical models, sound waves, microwaves, astronomy, plant keys, reading geological maps, and natural dye processes. (DS)

  13. 7 CFR 1780.39 - Application processing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... profession as a whole for similar work when RUS financing is not involved. Applicants will be responsible for... services are procured separately, the selection of the engineer or architect shall be done by requesting.... Contracts or other forms of agreements for other services including management, operation, and maintenance...

  14. 30 CFR 206.259 - Determination of washing allowances.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Allowable maintenance expenses include: Maintenance of the wash plant; maintenance of equipment; maintenance..., or a cost equal to the depreciable investment in the wash plant multiplied by the rate of return in... depreciable fixed assets (including costs of delivery and installation of capital equipment) which are an...

  15. N-of-1 study of weight loss maintenance assessing predictors of physical activity, adherence to weight loss plan and weight change.

    PubMed

    Kwasnicka, Dominika; Dombrowski, Stephan U; White, Martin; Sniehotta, Falko F

    2017-06-01

    Behaviour change interventions are effective in supporting individuals to achieve clinically significant weight loss, but weight loss maintenance (WLM) is less often attained. This study examined predictive variables associated with WLM. N-of-1 study with daily ecological momentary assessment combined with objective measurement of weight and physical activity, collected with wireless devices (Fitbit™) for six months. Eight previously obese adults who had lost over 5% of their body weight in the past year took part. Data were analysed using time series methods. Predictor variables were based on five theoretical themes: maintenance motives, self-regulation, personal resources, habits, and environmental influences. Dependent variables were: objectively estimated step count and weight, and self-reported WLM plan adherence. For all participants, daily fluctuations in self-reported adherence to their WLM plan were significantly associated with most of the explanatory variables, including maintenance motivation and satisfaction with outcomes, self-regulation, habit, and stable environment. Personal resources were not a consistent predictor of plan adherence. This is the first study to assess theoretical predictions of WLM within individuals. WLM is a dynamic process including the interplay of motivation, self-regulation, habit, resources, and perceptions of environmental context. Individuals maintaining their weight have unique psychological profiles which could be accounted for in interventions.

  16. Space shuttle maintenance program planning document

    NASA Technical Reports Server (NTRS)

    Brown, D. V.

    1972-01-01

    A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

  17. The different oscillation patterns of alpha band in the early and later stages of working memory maintenance.

    PubMed

    Xie, Yuanjun; Feng, Zhengquan; Xu, Yuanyuan; Bian, Chen; Li, Min

    2016-10-28

    A putative functional role for alpha oscillations in working memory remains controversial. However, recent evidence suggests that such oscillation may reflect distinct phases of working memory processing. The present study investigated alpha band (8-13Hz) activity during the maintenance stage of working memory using a modified Sternberg working memory task. Our results reveal that alpha power was concentrated primarily in the occipital cortex and was decreased during the early stage of maintenance (0-600ms), and subsequently increased during the later stage of maintenance (1000-1600ms). We suggest that reduced alpha power may be involved in focused attention during the working memory maintenance, whereas increased alpha power may reflect suppression of visual stimuli to facilitate internal processing related to the task. This interpretation is generally consistent with recent reports suggesting that variations in alpha power are associated with the representation and processing of information in the discrete time intervals during the working memory maintenance. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  18. Computerizing Maintenance Management Improves School Processes.

    ERIC Educational Resources Information Center

    Conroy, Pat

    2002-01-01

    Describes how a Computerized Maintenance Management System (CMMS), a centralized maintenance operations database that facilitates work order procedures and staff directives, can help individual school campuses and school districts to manage maintenance. Presents the benefits of CMMS and things to consider in CMMS selection. (EV)

  19. Reverse osmosis plant maintenance and efficacy in chronic kidney disease endemic region in Sri Lanka.

    PubMed

    Jayasumana, Channa; Ranasinghe, Omesh; Ranasinghe, Sachini; Siriwardhana, Imalka; Gunatilake, Sarath; Siribaddana, Sisira

    2016-11-01

    Chronic Interstitial Nephritis in Agricultural Communities (CINAC) causes major morbidity and mortality for farmers in North-Central province (NCP) of Sri Lanka. To prevent the CINAC, reverse osmosis (RO) plants are established to purify the water and reduce the exposure to possible nephrotoxins through drinking water. We assessed RO plant maintenance and efficacy in NCP. We have interviewed 10 RO plant operators on plant establishment, maintenance, usage and funding. We also measured total dissolved solids (TDS in ppm) to assess the efficacy of the RO process. Most RO plants were operated by community-based organizations. They provide clean and sustainable water source for many in the NCP for a nominal fee, which tends to be variable. The RO plant operators carry out RO plant maintenance. However, maintenance procedures and quality management practices tend to vary from an operator to another. RO process itself has the ability to lower the TDS of the water. On average, RO process reduces the TDS to 29 ppm. The RO process reduces the impurities in water available to many individuals within CINAC endemic regions. However, there variation in maintenance, quality management, and day-to-day care between operators can be a cause for concern. This variability can affect the quality of water produced by RO plant, its maintenance cost and lifespan. Thus, uniform regulation and training is needed to reduce cost of maintenance and increase the efficacy of RO plants.

  20. Advanced Terrain Representation for the Microticcit Workstation: System Maintenance Manual

    DTIC Science & Technology

    1986-02-01

    enter the */ /* password. */ /* Inputs: passwd - password to compare userfs entry to */ /* Outputs: TRUE - if password entered correctly...include "atrdefs.h" #include "ctype.h" extern char window[]; /* useable portion of screen */ 1 i getpw( passwd ) char passwd []; { int c...blank input window */ pcvgcp(&row,*col); curs_off(); nchars - ntries - 0; len « strlen( passwd ); pcvwca(len,• *,REVIDEO); /* process keys till user

  1. HL-20 operations and support requirements for the Personnel Launch System mission

    NASA Technical Reports Server (NTRS)

    Morris, W. D.; White, Nancy H.; Caldwell, Ronald G.

    1993-01-01

    The processing, mission planning, and support requirements were defined for the HL-20 lifting-body configuration that can serve as a Personnel Launch System. These requirements were based on the assumption of an operating environment that incorporates aircraft and airline support methods and techniques that are applicable to operations. The study covered the complete turnaround process for the HL-20, including landing through launch, and mission operations, but did not address the support requirements of the launch vehicle except for the integrated activities. Support is defined in terms of manpower, staffing levels, facilities, ground support equipment, maintenance/sparing requirements, and turnaround processing time. Support results were drawn from two contracted studies, plus an in-house analysis used to define the maintenance manpower. The results of the contracted studies were used as the basis for a stochastic simulation of the support environment to determine the sufficiency of support and the effect of variance on vehicle processing. Results indicate the levels of support defined for the HL-20 through this process to be sufficient to achieve the desired flight rate of eight flights per year.

  2. Sexual function in F-111 maintenance workers: the study of health outcomes in aircraft maintenance personnel.

    PubMed

    Brown, Anthony; Gibson, Richard; Tavener, Meredith; Guest, Maya; D'Este, Catherine; Byles, Julie; Attia, John; Horsley, Keith; Harrex, Warren; Ross, James

    2009-06-01

    In Australia, four formal F-111 fuel tank deseal/reseal (DSRS) repair programs were implemented over more than two decades, each involving different processes and using a range of hazardous substances. However, health concerns were raised by a number of workers. The "Study of Health Outcomes in Aircraft Maintenance Personnel" was commissioned by the Australian Department of Defence to investigate potential adverse health outcomes as a result of being involved in the deseal/reseal processes. To compare measures of sexual function in F-111 aircraft fuel tank DSRS maintenance workers, against two appropriate comparison groups. Exposed and comparison participants completed a postal questionnaire which included general questions of health and health behavior, and two specific questions on sexual functioning. They also completed the International Index of Erectile Function (IIEF) questionnaire. Logistic regression was used to explore exposure status and outcome while adjusting for potential confounders. The three outcomes of interest for this study were the proportion of participants with erectile dysfunction (ED) according to the IIEF, the proportion with self-reported loss of interest in sex, and the proportion with self-reported problems with sexual functioning. Compared with each of the comparison groups, a larger proportion of the exposed group reported sexual problems and were classified as having ED according to the IIEF. In logistic regression, the odds of all three outcomes were higher for exposed participants relative to each comparison group and after adjustment for potentially confounding variables including anxiety and depression. There was a consistent problem with sexual functioning in the exposed group that is not explained by anxiety and depression, and it appears related to DSRS activities.

  3. 12 CFR 325.202 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... MAINTENANCE Annual Stress Test § 325.202 Definitions. For purposes of this subpart— (a) Adverse scenario means... appropriate for use in the company-run stress tests, including, but not limited to, baseline, adverse, and... of the Federal Deposit Insurance Act (12 U.S.C. 1813). (l) Stress test means the process to assess...

  4. 12 CFR 325.202 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... MAINTENANCE Annual Stress Test § 325.202 Definitions. For purposes of this subpart— (a) Adverse scenario means... appropriate for use in the company-run stress tests, including, but not limited to, baseline, adverse, and... of the Federal Deposit Insurance Act (12 U.S.C. 1813). (l) Stress test means the process to assess...

  5. Psychological Distress in Law Students and Lawyers.

    ERIC Educational Resources Information Center

    Benjamin, G. Andrew H.; And Others

    The anecdotal literature suggests that the process of legal education impairs the maintenance of emotional well-being in law students. This study examined the emotional well-being of subjects (N=706) before, during, and after law school. Data were collected using four standardized self-report instruments including the Brief Symptom Inventory, Beck…

  6. Measuring research progress in photovoltaics

    NASA Technical Reports Server (NTRS)

    Jackson, B.; Mcguire, P.

    1986-01-01

    The role and some results of the project analysis and integration function in the Flat-plate Solar Array (FSA) Project are presented. Activities included supporting the decision-making process, preparation of plans for project direction, setting goals for project activities, measuring progress within the project, and the development and maintenance of analytical models.

  7. 25 CFR 170.807 - What must BIA include when it develops an IRR Transportation Facilities Maintenance Management...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Transportation Facilities Maintenance Management System? 170.807 Section 170.807 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.807 What must BIA include when it develops an IRR Transportation Facilities Maintenance Management System...

  8. What maintains the waters flowing in our rivers?

    NASA Astrophysics Data System (ADS)

    Vasconcelos, Vitor Vieira

    2017-07-01

    This article discusses how new contributions from hydrogeological science in the 20th and 21st centuries have allowed for a better understanding of the processes that affect the maintenance of river flows. Moreover, the way in which this knowledge has been conveyed beyond academia and has been gradually incorporated into public policy for natural resource management is also discussed. This article explains the development of several approaches used to understand the relationships among the management of aquifers, vegetation and river flows, including water balance, aquifer recharge, the piston effect, seasonal effects, and safe and sustainable yields. Additionally, the current challenges regarding the modeling of hydrological processes that integrate groundwater and surface waters are discussed. Examples of studies applied in Brazil that demonstrate these processes and stimulate thought regarding water management strategies are presented. In light of the case studies, it is possible to propose different strategies, each adapted for specific hydrogeological context to maximize aquifer recharge or base flow maintenance. Based on these strategies, the role of infiltration ponds and other artificial recharge techniques is re-evaluated in the context of the mitigation of environmental impacts on the maintenance of river flows. Proposals for the improvement of public policies regarding the payment of related environmental services to stimulate investment in aquifer recharge and the maintenance of base flow, for which the goal is to attain win-win-win situations for the environment, farmers and water users, while preventing land speculation, are discussed. Lastly, a conceptual model for the dissemination of hydrogeological knowledge in public policies is provided, and its challenges and possibilities are discussed.

  9. Mapping the maintenance stage of recovery: a qualitative study among treated and non-treated former alcohol dependents in Poland.

    PubMed

    Klingemann, Justyna Iwona

    2012-01-01

    The study provides an in-depth qualitative understanding of the maintenance stage when recovering from alcohol dependence with a focus on the broader social context of change of addictive behaviour. It explores the recovery as a subjective process within the abstinence-oriented Polish treatment system organized on the basis of the Minnesota model and is probes for group differences between treated and non-treated populations. The study is based on qualitative data from a media-recruited sample of 29 treated and non-treated former alcohol dependents (ICD-10) in Warsaw/Poland 2006/2007. They reported a recovery time of at least 2 years (M(recovery) = 11, SD = 9). In-depth, semi-structured interviews were analysed according to the problem-centred interview method using ATLAS.ti software. A wide range of maintenance strategies potentially contributing to the stabilization of recovery from alcohol dependence was identified. However, from the respondents' point of view, the change process is contingent upon the subjective weighing of specific maintenance factors and the importance attributed to their interplay. This includes time management as well as one's ability to invest available resources and strengths in shaping and pursuing personal goals. More commonalities than differences can be observed between groups during the maintenance stage, regardless of respondents' type of the pathway out of addiction. However, when confronting professional concepts of recovery with subjective accounts, only a subgroup conforms to the invasive, potentially normative definitions of recovery, while others do not link their recovery with identity transformation.

  10. An enhanced reliability-oriented workforce planning model for process industry using combined fuzzy goal programming and differential evolution approach

    NASA Astrophysics Data System (ADS)

    Ighravwe, D. E.; Oke, S. A.; Adebiyi, K. A.

    2018-03-01

    This paper draws on the "human reliability" concept as a structure for gaining insight into the maintenance workforce assessment in a process industry. Human reliability hinges on developing the reliability of humans to a threshold that guides the maintenance workforce to execute accurate decisions within the limits of resources and time allocations. This concept offers a worthwhile point of deviation to encompass three elegant adjustments to literature model in terms of maintenance time, workforce performance and return-on-workforce investments. These fully explain the results of our influence. The presented structure breaks new grounds in maintenance workforce theory and practice from a number of perspectives. First, we have successfully implemented fuzzy goal programming (FGP) and differential evolution (DE) techniques for the solution of optimisation problem in maintenance of a process plant for the first time. The results obtained in this work showed better quality of solution from the DE algorithm compared with those of genetic algorithm and particle swarm optimisation algorithm, thus expressing superiority of the proposed procedure over them. Second, the analytical discourse, which was framed on stochastic theory, focusing on specific application to a process plant in Nigeria is a novelty. The work provides more insights into maintenance workforce planning during overhaul rework and overtime maintenance activities in manufacturing systems and demonstrated capacity in generating substantially helpful information for practice.

  11. Optimal Medical Equipment Maintenance Service Proposal Decision Support System combining Activity Based Costing (ABC) and the Analytic Hierarchy Process (AHP).

    PubMed

    da Rocha, Leticia; Sloane, Elliot; M Bassani, Jose

    2005-01-01

    This study describes a framework to support the choice of the maintenance service (in-house or third party contract) for each category of medical equipment based on: a) the real medical equipment maintenance management system currently used by the biomedical engineering group of the public health system of the Universidade Estadual de Campinas located in Brazil to control the medical equipment maintenance service, b) the Activity Based Costing (ABC) method, and c) the Analytic Hierarchy Process (AHP) method. Results show the cost and performance related to each type of maintenance service. Decision-makers can use these results to evaluate possible strategies for the categories of equipment.

  12. The Fanconi anaemia pathway: new players and new functions.

    PubMed

    Ceccaldi, Raphael; Sarangi, Prabha; D'Andrea, Alan D

    2016-06-01

    The Fanconi anaemia pathway repairs DNA interstrand crosslinks (ICLs) in the genome. Our understanding of this complex pathway is still evolving, as new components continue to be identified and new biochemical systems are used to elucidate the molecular steps of repair. The Fanconi anaemia pathway uses components of other known DNA repair processes to achieve proper repair of ICLs. Moreover, Fanconi anaemia proteins have functions in genome maintenance beyond their canonical roles of repairing ICLs. Such functions include the stabilization of replication forks and the regulation of cytokinesis. Thus, Fanconi anaemia proteins are emerging as master regulators of genomic integrity that coordinate several repair processes. Here, we summarize our current understanding of the functions of the Fanconi anaemia pathway in ICL repair, together with an overview of its connections with other repair pathways and its emerging roles in genome maintenance.

  13. Maneuver Recovery Analysis for the Magnetospheric Multiscale Mission

    NASA Technical Reports Server (NTRS)

    Gramling, Cheryl; Carpenter, Russell; Volle, Michael; Lee, Taesul; Long, Anne

    2007-01-01

    The use of spacecraft formations creates new and more demanding requirements for orbit determination accuracy. In addition to absolute navigation requirements, there are typically relative navigation requirements that are based on the size or shape of the formation. The difficulty in meeting these requirements is related to the relative dynamics of the spacecraft orbits and the frequency of the formation maintenance maneuvers. This paper examines the effects of bi-weekly formation maintenance maneuvers on the absolute and relative orbit determination accuracy for the four-spacecraft Magnetospheric Multiscale (MMS) formation. Results are presented from high fidelity simulations that include the effects of realistic orbit determination errors in the maneuver planning process. Solutions are determined using a high accuracy extended Kalman filter designed for onboard navigation. Three different solutions are examined, considering the effects of process noise and measurement rate on the solutions.

  14. Wiring Damage Analyses for STS OV-103

    NASA Technical Reports Server (NTRS)

    Thomas, Walter, III

    2006-01-01

    This study investigated the Shuttle Program s belief that Space Transportation System (STS) wiring damage occurrences are random, that is, a constant occurrence rate. Using Problem Reporting and Corrective Action (PRACA)-derived data for STS Space Shuttle OV-103, wiring damage was observed to increase over the vehicle s life. Causal factors could include wiring physical deterioration, maintenance and inspection induced damage, and inspection process changes resulting in more damage events being reported. Induced damage effects cannot be resolved with existent data. Growth analysis (using Crow-AMSAA, or CA) resolved maintenance/inspection effects (e.g., heightened awareness) on all wire damages and indicated an overall increase since Challenger Return-to-Flight (RTF). An increasing failure or occurrence rate per flight cycle was seen for each wire damage mode; these (individual) rates were not affected by inspection process effects, within statistical error.

  15. Contribution to the Optimization of Strategy of Maintenance by Lean Six Sigma

    NASA Astrophysics Data System (ADS)

    Youssouf, Ayadi; Rachid, Chaib; Ion, Verzea

    The efficiency of the maintenance of the industrial systems is a major economic stake for their business concern. The main difficulties and the sources of ineffectiveness live in the choice of the actions of maintenance especially when the machine plays a vital role in the process of production. But as Algeria has embarked on major infrastructure projects in transport, housing, automobile, manufacturing industry and construction (factories, housing, highway, subway, tram, etc.) requiring new implications on maintenance strategies that meet industry requirements imposed by the exploitation. From then on and seen the importance of the maintenance on the economic market and sound impacts on the performances of the installations, methods of optimization were developed. For this purpose, to ensure the survival of businesses, be credible, contributing and competitive in the market, maintenance services must continually adapt to the progress of technical areas, technological and organizational even help maintenance managers to construct or to modify maintenance strategies, objective of this work. Our contribution in this work focuses on the optimization of maintenance for industrial systems by the use of Lean six Sigma bases. Lean Six Sigma is a method of improving the quality and profitability based on mastering statically of process and it is also a management style that based on a highly regulated organization dedicated to managing project. The method is based on five main steps summarized in the acronym (DMAIC): Define Measure, Analyze, Improve and Control. Application of the method on the maintenance processes with using maintenance methods during the five phases of the method will help to reduce costs and losses in order to strive for optimum results in terms of profit and quality.

  16. BOREAS RSS-8 BIOME-BGC Model Simulations at Tower Flux Sites in 1994

    NASA Technical Reports Server (NTRS)

    Hall, Forrest G. (Editor); Nickeson, Jaime (Editor); Kimball, John

    2000-01-01

    BIOME-BGC is a general ecosystem process model designed to simulate biogeochemical and hydrologic processes across multiple scales (Running and Hunt, 1993). In this investigation, BIOME-BGC was used to estimate daily water and carbon budgets for the BOREAS tower flux sites for 1994. Carbon variables estimated by the model include gross primary production (i.e., net photosynthesis), maintenance and heterotrophic respiration, net primary production, and net ecosystem carbon exchange. Hydrologic variables estimated by the model include snowcover, evaporation, transpiration, evapotranspiration, soil moisture, and outflow. The information provided by the investigation includes input initialization and model output files for various sites in tabular ASCII format.

  17. 18 CFR 367.9350 - Account 935, Maintenance of structures and equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... POWER ACT AND NATURAL GAS ACT Operation and Maintenance Expense Chart of Accounts § 367.9350 Account 935, Maintenance of structures and equipment. This account must include materials used and expenses incurred in the maintenance of property owned, the cost of which is included in accounts 390 through 399 (§§ 367.3900 through...

  18. Informed maintenance for next generation space transportation systems

    NASA Astrophysics Data System (ADS)

    Fox, Jack J.

    2001-02-01

    Perhaps the most substantial single obstacle to progress of space exploration and utilization of space for human benefit is the safety & reliability and the inherent cost of launching to, and returning from, space. The primary influence in the high costs of current launch systems (the same is true for commercial and military aircraft and most other reusable systems) is the operations, maintenance and infrastructure portion of the program's total life cycle costs. Reusable Launch Vehicle (RLV) maintenance and design have traditionally been two separate engineering disciplines with often conflicting objectives-maximizing ease of maintenance versus optimizing performance, size and cost. Testability analysis, an element of Informed Maintenance (IM), has been an ad hoc, manual effort, in which maintenance engineers attempt to identify an efficient method of troubleshooting for the given product, with little or no control over product design. Therefore, testability deficiencies in the design cannot be rectified. It is now widely recognized that IM must be engineered into the product at the design stage itself, so that an optimal compromise is achieved between system maintainability and performance. The elements of IM include testability analysis, diagnostics/prognostics, automated maintenance scheduling, automated logistics coordination, paperless documentation and data mining. IM derives its heritage from complimentary NASA science, space and aeronautic enterprises such as the on-board autonomous Remote Agent Architecture recently flown on NASA's Deep Space 1 Probe as well as commercial industries that employ quick turnaround operations. Commercial technologies and processes supporting NASA's IM initiatives include condition based maintenance technologies from Boeing's Commercial 777 Aircraft and Lockheed-Martin's F-22 Fighter, automotive computer diagnostics and autonomous controllers that enable 100,000 mile maintenance free operations, and locomotive monitoring system software. This paper will summarize NASA's long-term strategy, development, and implementation plans for Informed Maintenance for next generation RLVs. This will be done through a convergence into a single IM vision the work being performed throughout NASA, industry and academia. Additionally, a current status of IM development throughout NASA programs such as the Space Shuttle, X-33, X-34 and X-37 will be provided and will conclude with an overview of near-term work that is being initiated in FY00 to support NASA's 2nd Generation Reusable Launch Vehicle Program. .

  19. Informed maintenance for next generation reusable launch systems

    NASA Astrophysics Data System (ADS)

    Fox, Jack J.; Gormley, Thomas J.

    2001-03-01

    Perhaps the most substantial single obstacle to progress of space exploration and utilization of space for human benefit is the safety & reliability and the inherent cost of launching to, and returning from, space. The primary influence in the high costs of current launch systems (the same is true for commercial and military aircraft and most other reusable systems) is the operations, maintenance and infrastructure portion of the program's total life cycle costs. Reusable Launch Vehicle (RLV) maintenance and design have traditionally been two separate engineering disciplines with often conflicting objectives - maximizing ease of maintenance versus optimizing performance, size and cost. Testability analysis, an element of Informed Maintenance (IM), has been an ad hoc, manual effort, in which maintenance engineers attempt to identify an efficient method of troubleshooting for the given product, with little or no control over product design. Therefore, testability deficiencies in the design cannot be rectified. It is now widely recognized that IM must be engineered into the product at the design stage itself, so that an optimal compromise is achieved between system maintainability and performance. The elements of IM include testability analysis, diagnostics/prognostics, automated maintenance scheduling, automated logistics coordination, paperless documentation and data mining. IM derives its heritage from complimentary NASA science, space and aeronautic enterprises such as the on-board autonomous Remote Agent Architecture recently flown on NASA's Deep Space 1 Probe as well as commercial industries that employ quick turnaround operations. Commercial technologies and processes supporting NASA's IM initiatives include condition based maintenance technologies from Boeing's Commercial 777 Aircraft and Lockheed-Martin's F-22 Fighter, automotive computer diagnostics and autonomous controllers that enable 100,000 mile maintenance free operations, and locomotive monitoring system software. This paper will summarize NASA's long-term strategy, development, and implementation plans for Informed Maintenance for next generation RLVs. This will be done through a convergence into a single IM vision the work being performed throughout NASA, industry and academia. Additionally, a current status of IM development throughout NASA programs such as the Space Shuttle, X-33, X-34 and X-37 will be provided and will conclude with an overview of near-term work that is being initiated in FY00 to support NASA's 2 nd Generation Reusable Launch Vehicle Program.

  20. Implementation of the fugitive emissions system program: The OxyChem experience

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deshmukh, A.

    An overview is provided for the Fugitive Emissions System (FES) that has been implemented at Occidental Chemical in conjunction with the computer-based maintenance system called PassPort{reg_sign} developed by Indus Corporation. The goal of PassPort{reg_sign} FES program has been to interface with facilities data, equipment information, work standards and work orders. Along the way, several implementation hurdles had to be overcome before a monitoring and regulatory system could be standardized for the appropriate maintenance, process and environmental groups. This presentation includes step-by-step account of several case studies that developed during the implementation of the FES system.

  1. Mitochondrial DNA repair and damage tolerance.

    PubMed

    Stein, Alexis; Sia, Elaine A

    2017-01-01

    The accurate maintenance of mitochondrial DNA (mtDNA) is required in order for eukaryotic cells to assemble a functional electron transport chain. This independently-maintained genome relies on nuclear-encoded proteins that are imported into the mitochondria to carry out replication and repair processes. Decades of research has made clear that mitochondria employ robust and varied mtDNA repair and damage tolerance mechanisms in order to ensure the proper maintenance of the mitochondrial genome. This review focuses on our current understanding of mtDNA repair and damage tolerance pathways including base excision repair, mismatch repair, homologous recombination, non-homologous end joining, translesion synthesis and mtDNA degradation in both yeast and mammalian systems.

  2. Advanced oxidation and disinfection processes for onsite net-zero greywater reuse: A review.

    PubMed

    Gassie, Lucien W; Englehardt, James D

    2017-11-15

    Net-zero greywater (NZGW) reuse, or nearly closed-loop recycle of greywater for all original uses, can recover both water and its attendant hot-water thermal energy, while avoiding the installation and maintenance of a separate greywater sewer in residential areas. Such a system, if portable, could also provide wash water for remote emergency health care units. However, such greywater reuse engenders human contact with the recycled water, and hence superior treatment. The purpose of this paper is to review processes applicable to the mineralization of organics, including control of oxidative byproducts such as bromate, and maintenance of disinfection consistent with potable reuse guidelines, in NZGW systems. Specifically, TiO 2 -UV, UV-hydrogen peroxide, hydrogen peroxide-ozone, ozone-UV advanced oxidation processes, and UV, ozone, hydrogen peroxide, filtration, and chlorine disinfection processes were reviewed for performance, energy demand, environmental impact, and operational simplicity. Based on the literature reviewed, peroxone is the most energy-efficient process for organics mineralization. However, in portable applications where delivery of chemicals to the site is a concern, the UV-ozone process appears promising, at higher energy demand. In either case, reverse osmosis, nanofiltration, or ED may be useful in controlling the bromide precursor in make-up water, and a minor side-stream of ozone may be used to prevent microbial regrowth in the treated water. Where energy is not paramount, UV-hydrogen peroxide and UV-TiO 2 can be used to mineralize organics while avoiding bromate formation, but may require a secondary process to prevent microbial regrowth. Chlorine and ozone may be useful for maintenance of disinfection residual. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Disentangling working memory processes during spatial span assessment: a modeling analysis of preferred eye movement strategies.

    PubMed

    Patt, Virginie M; Thomas, Michael L; Minassian, Arpi; Geyer, Mark A; Brown, Gregory G; Perry, William

    2014-01-01

    The neurocognitive processes involved during classic spatial working memory (SWM) assessment were investigated by examining naturally preferred eye movement strategies. Cognitively healthy adult volunteers were tested in a computerized version of the Corsi Block-Tapping Task--a spatial span task requiring the short term maintenance of a series of locations presented in a specific order--coupled with eye tracking. Modeling analysis was developed to characterize eye-tracking patterns across all task phases, including encoding, retention, and recall. Results revealed a natural preference for local gaze maintenance during both encoding and retention, with fewer than 40% fixated targets. These findings contrasted with the stimulus retracing pattern expected during recall as a result of task demands, with 80% fixated targets. Along with participants' self-reported strategies of mentally "making shapes," these results suggest the involvement of covert attention shifts and higher order cognitive Gestalt processes during spatial span tasks, challenging instrument validity as a single measure of SWM storage capacity.

  4. Maintenance Management Update.

    ERIC Educational Resources Information Center

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  5. 40 CFR 761.193 - Maintenance of monitoring records by persons who import, manufacture, process, distribute in...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... persons who import, manufacture, process, distribute in commerce, or use chemicals containing..., DISTRIBUTION IN COMMERCE, AND USE PROHIBITIONS General Records and Reports § 761.193 Maintenance of monitoring records by persons who import, manufacture, process, distribute in commerce, or use chemicals containing...

  6. EAST ELEVATION OF MAIN PROCESSING BUILDING (CPP601) LOOKING NORTHWEST. MAINTENANCE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    EAST ELEVATION OF MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTHWEST. MAINTENANCE SHOP AND OFFICE BUILDING (CPP-630) ON RIGHT IN PHOTO. INL PHOTO NUMBER HD-22-3-2. Mike Crane, Photographer, 11/1998 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  7. Elements of a Green Infrastructure Maintenance Business Plan for Milwaukee WI

    EPA Pesticide Factsheets

    This report reflects the feedback provided by MMSD and local stakeholders about different business models for conducting maintenance. The findings from this process will inform a maintenance plan for the region.

  8. Application of FBG sensors in strengthening and maintenance monitoring of old bridges

    NASA Astrophysics Data System (ADS)

    Yue, Li-na; Huang, Jun; Yang, Yan

    2009-10-01

    The various fiber Bragg grating(FBG)sensors such as FBG force rings, differential FBG displacement cells, FBG strain sensors and FBG temperature sensors had been used to monitor the strengthening and maintenance process of the continuous concrete beam bridges and the continuous concrete rigid frame bridges which are the part of Wuhan Second Yangtze River Bridge. In the strengthening and maintenance process, the tension force of the external prestressed tendons, the cracks change and intensity of cross sections had been monitored to insure the instruction safety, study the effect of strengthening and maintenance, and verify the design theories of strengthening and maintenance. Also the reference state criterion for long-term bridge health monitoring had been provided according to the monitoring results.

  9. 30 CFR 285.628 - How will MMS process my COP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... allow this to occur. (g) If MMS approves your project easement, MMS will issue an addendum to your lease specifying the terms of the project easement. A project easement may include off-lease areas that: (1... feet (61 meters) in width, unless safety and environmental factors during construction and maintenance...

  10. Discovering the Possibilities of Career Counseling in Business and Industry.

    ERIC Educational Resources Information Center

    McCharen, Belinda

    The changing nature of the workplace is increasing recognition of the fact that employee career development is a lifelong process essential to the achievement and maintenance of a high-quality, competitive work force. Offering employees the opportunity to participate in growth and development programs that include career counseling, assessment,…

  11. 40 CFR 65.3 - Compliance with standards and operation and maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...)(4)(i) and (ii) do not apply to Group 2A or Group 2B process vents. Compliance with design, equipment, work practice, and operational standards, including those for equipment leaks, shall be determined... this part. (5) Design, equipment, work practice, or operational standards. Paragraphs (b)(5)(i) and (ii...

  12. 40 CFR 63.2281 - What reports must I submit and when?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... description of control device maintenance performed while the control device was offline and one or more of the process units controlled by the control device was operating, including the information specified in paragraphs (c)(5)(i) through (iii) of this section. (i) The date and time when the control device...

  13. Recent advances in thermoregulation.

    PubMed

    Tansey, Etain A; Johnson, Christopher D

    2015-09-01

    Thermoregulation is the maintenance of a relatively constant core body temperature. Humans normally maintain a body temperature at 37°C, and maintenance of this relatively high temperature is critical to human survival. This concept is so important that control of thermoregulation is often the principal example cited when teaching physiological homeostasis. A basic understanding of the processes underpinning temperature regulation is necessary for all undergraduate students studying biology and biology-related disciplines, and a thorough understanding is necessary for those students in clinical training. Our aim in this review is to broadly present the thermoregulatory process taking into account current advances in this area. First, we summarize the basic concepts of thermoregulation and subsequently assess the physiological responses to heat and cold stress, including vasodilation and vasoconstriction, sweating, nonshivering thermogenesis, piloerection, shivering, and altered behavior. Current research is presented concerning the body's detection of thermal challenge, peripheral and central thermoregulatory control mechanisms, including brown adipose tissue in adult humans and temperature transduction by the relatively recently discovered transient receptor potential channels. Finally, we present an updated understanding of the neuroanatomic circuitry supporting thermoregulation. Copyright © 2015 The American Physiological Society.

  14. Distinct brain networks for adaptive and stable task control in humans

    PubMed Central

    Dosenbach, Nico U. F.; Fair, Damien A.; Miezin, Francis M.; Cohen, Alexander L.; Wenger, Kristin K.; Dosenbach, Ronny A. T.; Fox, Michael D.; Snyder, Abraham Z.; Vincent, Justin L.; Raichle, Marcus E.; Schlaggar, Bradley L.; Petersen, Steven E.

    2007-01-01

    Control regions in the brain are thought to provide signals that configure the brain's moment-to-moment information processing. Previously, we identified regions that carried signals related to task-control initiation, maintenance, and adjustment. Here we characterize the interactions of these regions by applying graph theory to resting state functional connectivity MRI data. In contrast to previous, more unitary models of control, this approach suggests the presence of two distinct task-control networks. A frontoparietal network included the dorsolateral prefrontal cortex and intraparietal sulcus. This network emphasized start-cue and error-related activity and may initiate and adapt control on a trial-by-trial basis. The second network included dorsal anterior cingulate/medial superior frontal cortex, anterior insula/frontal operculum, and anterior prefrontal cortex. Among other signals, these regions showed activity sustained across the entire task epoch, suggesting that this network may control goal-directed behavior through the stable maintenance of task sets. These two independent networks appear to operate on different time scales and affect downstream processing via dissociable mechanisms. PMID:17576922

  15. Associations between Poor Sleep Quality and Stages of Change of Multiple Health Behaviors among Participants of Employee Wellness Program.

    PubMed

    Hui, Siu-Kuen Azor; Grandner, Michael A

    2015-01-01

    Using the Transtheoretical Model of behavioral change, this study evaluates the relationship between sleep quality and the motivation and maintenance processes of healthy behavior change. The current study is an analysis of data collected in 2008 from an online health risk assessment (HRA) survey completed by participants of the Kansas State employee wellness program (N=13,322). Using multinomial logistic regression, associations between self-reported sleep quality and stages of change (i.e. precontemplation, contemplation, preparation, action, maintenance) in five health behaviors (stress management, weight management, physical activities, alcohol use, and smoking) were analyzed. Adjusted for covariates, poor sleep quality was associated with an increased likelihood of contemplation, preparation, and in some cases action stage when engaging in the health behavior change process, but generally a lower likelihood of maintenance of the healthy behavior. The present study demonstrated that poor sleep quality was associated with an elevated likelihood of contemplating or initiating behavior change, but a decreased likelihood of maintaining healthy behavior change. It is important to include sleep improvement as one of the lifestyle management interventions offered in EWP to comprehensively reduce health risks and promote the health of a large employee population.

  16. Energy management study: A proposed case of government building

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tahir, Mohamad Zamhari; Nawi, Mohd Nasrun Mohd; Baharum, Mohd Faizal

    Align with the current needs of the sustainable and green technology in Malaysian construction industry, this research is conducted to seek and identify opportunities to better manage energy use including the process of understand when, where, and how energy is used in a building. The purpose of this research is to provide a best practice guideline as a practical tool to assist construction industry in Malaysia to improve the energy efficiency of the office building during the post-production by reviewing the current practice of the building operation and maintenance in order to optimum the usage and reduce the amount ofmore » energy input into the building. Therefore, this paper will review the concept of maintenance management, current issue in energy management, and on how the research process will be conducted. There are several process involves and focuses on technical and management techniques such as energy metering, tracing, harvesting, and auditing based on the case study that will be accomplish soon. Accordingly, a case study is appropriate to be selected as a strategic research approach in which involves an empirical investigation of a particular contemporary phenomenon within its real life context using multiple sources of evidence for the data collection process. A Government office building will be selected as an appropriate case study for this research. In the end of this research, it will recommend a strategic approach or model in a specific guideline for enabling energy-efficient operation and maintenance in the office building.« less

  17. Energy management study: A proposed case of government building

    NASA Astrophysics Data System (ADS)

    Tahir, Mohamad Zamhari; Nawi, Mohd Nasrun Mohd; Baharum, Mohd Faizal

    2015-05-01

    Align with the current needs of the sustainable and green technology in Malaysian construction industry, this research is conducted to seek and identify opportunities to better manage energy use including the process of understand when, where, and how energy is used in a building. The purpose of this research is to provide a best practice guideline as a practical tool to assist construction industry in Malaysia to improve the energy efficiency of the office building during the post-production by reviewing the current practice of the building operation and maintenance in order to optimum the usage and reduce the amount of energy input into the building. Therefore, this paper will review the concept of maintenance management, current issue in energy management, and on how the research process will be conducted. There are several process involves and focuses on technical and management techniques such as energy metering, tracing, harvesting, and auditing based on the case study that will be accomplish soon. Accordingly, a case study is appropriate to be selected as a strategic research approach in which involves an empirical investigation of a particular contemporary phenomenon within its real life context using multiple sources of evidence for the data collection process. A Government office building will be selected as an appropriate case study for this research. In the end of this research, it will recommend a strategic approach or model in a specific guideline for enabling energy-efficient operation and maintenance in the office building.

  18. Strategies for the Management of Built Heritage Linked to Maintenance and Monitoring. Case Study of the San Roque Neighborhood, Cuenca, Ecuador

    NASA Astrophysics Data System (ADS)

    Achig-Balarezo, M. C.; Vázquez, L.; Barsallo, M. G.; Briones, J. C.; Amaya, J.

    2017-10-01

    The rehabilitation of heritage sites, as well as the implementation of monitoring and control strategies is fundamental for its conservation. In the case of Cuenca, a World Heritage City, a maintenance campaign in the traditional neighborhood of San Roque was carried out in 2014. The objective was to undertake maintenance actions on roofs and façades as well as on elements at risk. The campaign process was developed keeping in mind the cycle or phases of preventive conservation: anamnesis, diagnosis, therapy and control (ICOMOS, 2003). At the end of the maintenance campaign an impact assessment was undertaken and monitoring tools were handed out to the community in order to strengthen the citizen participation in the preservation of built heritage. The experience of the maintenance campaign unveiled a series of lessons that have been evaluated in the present investigation, being the main objective the strengthening of the processes of governance and documentation through the formulation of strategies inherent to the maintenance of heritage buildings. In this process it is shown that the participation of citizens is a strategic factor for the sustainable development of maintenance campaigns, which allow for the preservation of historical sites for future generations.

  19. Themes from a Camp Maintenance Network: Camp Maintenance and Property Personnel Share Their Insights and Challenges.

    ERIC Educational Resources Information Center

    Whyman, Wynne

    2003-01-01

    A camp maintenance survey was completed by maintenance personnel from 99 camps. Results highlighted several important considerations: ensuring sufficient maintenance funds for aging infrastructure, including camp/property personnel in decision making, publicizing completed maintenance projects, examining long-term needs of the land, and adopting…

  20. Maintaining physical activity over time: the importance of basic psychological need satisfaction in developing the physically active self.

    PubMed

    Springer, Judy B; Lamborn, Susie D; Pollard, Diane M

    2013-01-01

    Drawing from self-determination theory, this study investigated adults' perceptions of the process of long-term maintenance of physical activity and how it may relate to their self-identity. Qualitative study included 22 in-depth interviews and participants' recorded personal reflective journals. Health/fitness facility in a Midwestern city. Purposeful sample of 12 adult (age range 29-73 years) members who had engaged in regular physical activity for at least 3 years. Data were collected on participants' perceptions of processes associated with physical activity maintenance. Grounded theory data analysis techniques were used to develop an understanding of participants' long-term physical activity adherence. RESULTS. Analysis revealed three themes organized around basic psychological need satisfaction: (1) Relatedness included receiving and giving support. (2) Competence included challenge and competition, managing weight, and strategies for health management. (3) Autonomy included confidence in the established routine, valuing fitness status, and feeling self-directed. The final theme of physically active self included the personal fit of an active lifestyle, identity as an active person, and attachment to physical activity as life enhancing. Our results suggest that long-term physical activity adherence may be strengthened by promotion of the individual's basic psychological need satisfaction. Adherence is most likely to occur when the value of participation becomes internalized over time as a component of the physically active self.

  1. Building Maintenance, Management, and Budgeting.

    ERIC Educational Resources Information Center

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  2. Impaired ecosystem process despite little effects on populations: modeling combined effects of warming and toxicants.

    PubMed

    Galic, Nika; Grimm, Volker; Forbes, Valery E

    2017-08-01

    Freshwater ecosystems are exposed to many stressors, including toxic chemicals and global warming, which can impair, separately or in combination, important processes in organisms and hence higher levels of organization. Investigating combined effects of warming and toxicants has been a topic of little research, but neglecting their combined effects may seriously misguide management efforts. To explore how toxic chemicals and warming, alone and in combination, propagate across levels of biological organization, including a key ecosystem process, we developed an individual-based model (IBM) of a freshwater amphipod detritivore, Gammarus pseudolimnaeus, feeding on leaf litter. In this IBM, life history emerges from the individuals' energy budgets. We quantified, in different warming scenarios (+1-+4 °C), the effects of hypothetical toxicants on suborganismal processes, including feeding, somatic and maturity maintenance, growth, and reproduction. Warming reduced mean adult body sizes and population abundance and biomass, but only in the warmest scenarios. Leaf litter processing, a key contributor to ecosystem functioning and service delivery in streams, was consistently enhanced by warming, through strengthened interaction between the detritivorous consumer and its resource. Toxicant effects on feeding and maintenance resulted in initially small adverse effects on consumers, but ultimately led to population extinction and loss of ecosystem process. Warming in combination with toxicants had little effect at the individual and population levels, but ecosystem process was impaired in the warmer scenarios. Our results suggest that exposure to the same amount of toxicants can disproportionately compromise ecosystem processing depending on global warming scenarios; for example, reducing organismal feeding rates by 50% will reduce resource processing by 50% in current temperature conditions, but by up to 200% with warming of 4 °C. Our study has implications for assessing and monitoring impacts of chemicals on ecosystems facing global warming. We advise complementing existing monitoring approaches with directly quantifying ecosystem processes and services. © 2017 John Wiley & Sons Ltd.

  3. "WWW.MDTF.ORG": a World Wide Web forum for developing open-architecture, freely distributed, digital teaching file software by participant consensus.

    PubMed

    Katzman, G L; Morris, D; Lauman, J; Cochella, C; Goede, P; Harnsberger, H R

    2001-06-01

    To foster a community supported evaluation processes for open-source digital teaching file (DTF) development and maintenance. The mechanisms used to support this process will include standard web browsers, web servers, forum software, and custom additions to the forum software to potentially enable a mediated voting protocol. The web server will also serve as a focal point for beta and release software distribution, which is the desired end-goal of this process. We foresee that www.mdtf.org will provide for widespread distribution of open source DTF software that will include function and interface design decisions from community participation on the website forums.

  4. Cytoplasmic poly (A)-binding protein critically regulates epidermal maintenance and turnover in the planarian Schmidtea mediterranea.

    PubMed

    Bansal, Dhiru; Kulkarni, Jahnavi; Nadahalli, Kavana; Lakshmanan, Vairavan; Krishna, Srikar; Sasidharan, Vidyanand; Geo, Jini; Dilipkumar, Shilpa; Pasricha, Renu; Gulyani, Akash; Raghavan, Srikala; Palakodeti, Dasaradhi

    2017-09-01

    Identifying key cellular events that facilitate stem cell function and tissue organization is crucial for understanding the process of regeneration. Planarians are powerful model system to study regeneration and stem cell (neoblast) function. Here, using planaria, we show that the initial events of regeneration, such as epithelialization and epidermal organization are critically regulated by a novel cytoplasmic poly A-binding protein, SMED-PABPC2. Knockdown of smed-pabpc2 leads to defects in epidermal lineage specification, disorganization of epidermis and ECM, and deregulated wound healing, resulting in the selective failure of neoblast proliferation near the wound region. Polysome profiling suggests that epidermal lineage transcripts, including zfp-1 , are translationally regulated by SMED-PABPC2 . Together, our results uncover a novel role for SMED-PABPC2 in the maintenance of epidermal and ECM integrity, critical for wound healing and subsequent processes for regeneration. © 2017. Published by The Company of Biologists Ltd.

  5. Cytoplasmic poly (A)-binding protein critically regulates epidermal maintenance and turnover in the planarian Schmidtea mediterranea

    PubMed Central

    Bansal, Dhiru; Kulkarni, Jahnavi; Nadahalli, Kavana; Lakshmanan, Vairavan; Krishna, Srikar; Sasidharan, Vidyanand; Dilipkumar, Shilpa; Gulyani, Akash; Raghavan, Srikala

    2017-01-01

    Identifying key cellular events that facilitate stem cell function and tissue organization is crucial for understanding the process of regeneration. Planarians are powerful model system to study regeneration and stem cell (neoblast) function. Here, using planaria, we show that the initial events of regeneration, such as epithelialization and epidermal organization are critically regulated by a novel cytoplasmic poly A-binding protein, SMED-PABPC2. Knockdown of smed-pabpc2 leads to defects in epidermal lineage specification, disorganization of epidermis and ECM, and deregulated wound healing, resulting in the selective failure of neoblast proliferation near the wound region. Polysome profiling suggests that epidermal lineage transcripts, including zfp-1, are translationally regulated by SMED-PABPC2. Together, our results uncover a novel role for SMED-PABPC2 in the maintenance of epidermal and ECM integrity, critical for wound healing and subsequent processes for regeneration. PMID:28807897

  6. The Generation and Maintenance of Visual Mental Images: Evidence from Image Type and Aging

    ERIC Educational Resources Information Center

    De Beni, Rossana; Pazzaglia, Francesca; Gardini, Simona

    2007-01-01

    Imagery is a multi-componential process involving different mental operations. This paper addresses whether separate processes underlie the generation, maintenance and transformation of mental images or whether these cognitive processes rely on the same mental functions. We also examine the influence of age on these mental operations for…

  7. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    ERIC Educational Resources Information Center

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  8. Social facilitation maintenance treatment for adults with obesity: study protocol for a randomised-controlled feasibility study (SFM study).

    PubMed

    Hilbert, Anja

    2016-08-31

    The long-term success of non-surgical weight loss treatment in adults with obesity is limited by substantial relapse, and only a few evidence-based weight loss maintenance treatments exist. This clinical trial investigates the feasibility and efficacy of a social facilitation maintenance programme for weight loss maintenance, tailored to meet the needs of obese adults who have undergone a lifestyle weight loss intervention. In a single-centre, open feasibility trial, 72 adults currently or previously obese or overweight who have undergone a lifestyle weight loss intervention are centrally randomised to 4 months of social facilitation maintenance treatment or treatment as a usual control condition. In 16 outpatient group sessions, the social facilitation maintenance treatment, based on a socioecological model and on evidence supporting social facilitation as a key process in maintaining weight loss, focuses on promoting interpersonal relationships to build up a healthy lifestyle for long-term weight loss maintenance. Primary outcome is the amount of weight regain at 6-month follow-up, compared with pre-treatment weight, derived from measured body weight. Secondary outcomes address feasibility, including recruitment, attrition, assessment non-completion, compliance and patients' programme evaluation; and in comparison with pre-weight loss maintenance, social and interpersonal functioning, eating behaviour and physical activity, psychological and physical symptoms, body composition and risk of comorbidity, and quality of life at post-treatment and follow-up assessments. The study was approved by the Ethical Committee at the University of Leipzig (165-13-15072013). The study results will be disseminated through peer-reviewed publications. DRKS00005182. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    The ECE application forecasts annual costs of preventive and corrective maintenance for budgeting purposes. Features within the application enable the user to change the specifications of the model to customize your forecast to best fit their needs and support “what if” analysis. Based on the user's selections, the ECE model forecasts annual maintenance costs. Preventive maintenance costs include the cost of labor to perform preventive maintenance activities at the specific frequency and labor rate. Corrective maintenance costs include the cost of labor and the cost of replacement parts. The application presents forecasted maintenance costs for the next five years inmore » two tables: costs by year and costs by site.« less

  10. 77 FR 12175 - Airworthiness Directives; DASSAULT AVIATION Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... specified products. The MCAI states: The Maintenance Procedure (MP) 57-607, related to non destructive check... Recommended Maintenance Schedules chapter of the Aircraft Maintenance Documentation. After the implementation... maintenance program to include ``Non-Destructive Check of Flap Tracks 2 and 5,'' Maintenance Procedure 57-607...

  11. Liquid and Gaseous Waste Operations Department annual operating report CY 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maddox, J.J.; Scott, C.B.

    1997-03-01

    This annual report summarizes operating activities dealing with the process waste system, the liquid low-level waste system, and the gaseous waste system. It also describes upgrade activities dealing with the process and liquid low-level waste systems, the cathodic protection system, a stack ventilation system, and configuration control. Maintenance activities are described dealing with nonradiological wastewater treatment plant, process waste treatment plant and collection system, liquid low-level waste system, and gaseous waste system. Miscellaneous activities include training, audits/reviews/tours, and environmental restoration support.

  12. Parietal EEG alpha suppression time of memory retrieval reflects memory load while the alpha power of memory maintenance is a composite of the visual process according to simultaneous and successive Sternberg memory tasks.

    PubMed

    Okuhata, Shiho; Kusanagi, Takuya; Kobayashi, Tetsuo

    2013-10-25

    The present study investigated EEG alpha activity during visual Sternberg memory tasks using two different stimulus presentation modes to elucidate how the presentation mode affected parietal alpha activity. EEGs were recorded from 10 healthy adults during the Sternberg tasks in which memory items were presented simultaneously and successively. EEG power and suppression time (ST) in the alpha band (8-13Hz) were computed for the memory maintenance and retrieval phases. The alpha activity differed according to the presentation mode during the maintenance phase but not during the retrieval phase. Results indicated that parietal alpha power recorded during the maintenance phase did not reflect the memory load alone. In contrast, ST during the retrieval phase increased with the memory load for both presentation modes, indicating a serial memory scanning process, regardless of the presentation mode. These results indicate that there was a dynamic transition in the memory process from the maintenance phase, which was sensitive to external factors, toward the retrieval phase, during which the process converged on the sequential scanning process, the Sternberg task essentially required. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  13. Design local exhaust ventilation on sieve machine at PT.Perkebunan Nusantara VIII Ciater using design for assembly (DFA) approach with Boothroyd and Dewhurst method

    NASA Astrophysics Data System (ADS)

    Khalqihi, K. I.; Rahayu, M.; Rendra, M.

    2017-12-01

    PT Perkebunan Nusantara VIII Ciater is a company produced black tea orthodox more or less 4 tons every day. At the production section, PT Perkebunan Nusantara VIII will use local exhaust ventilation specially at sortation area on sieve machine. To maintain the quality of the black tea orthodox, all machine must be scheduled for maintenance every once a month and takes time 2 hours in workhours, with additional local exhaust ventilation, it will increase time for maintenance process, if maintenance takes time more than 2 hours it will caused production process delayed. To support maintenance process in PT Perkebunan Nusantara VIII Ciater, designing local exhaust ventilation using design for assembly approach with Boothroyd and Dewhurst method, design for assembly approach is choosen to simplify maintenance process which required assembly process. There are 2 LEV designs for this research. Design 1 with 94 components, assembly time 647.88 seconds and assembly efficiency level 23.62%. Design 2 with 82 components, assembly time 567.84 seconds and assembly efficiency level 24.83%. Design 2 is choosen for this research based on DFA goals, minimum total part that use, optimization assembly time, and assembly efficiency level.

  14. The impact of storage on processing: how is information maintained in working memory?

    PubMed

    Vergauwe, Evie; Camos, Valérie; Barrouillet, Pierre

    2014-07-01

    Working memory is typically defined as a system devoted to the simultaneous maintenance and processing of information. However, the interplay between these 2 functions is still a matter of debate in the literature, with views ranging from complete independence to complete dependence. The time-based resource-sharing model assumes that a central bottleneck constrains the 2 functions to alternate in such a way that maintenance activities postpone concurrent processing, with each additional piece of information to be maintained resulting in an additional postponement. Using different kinds of memoranda, we examined in a series of 7 experiments the effect of increasing memory load on different processing tasks. The results reveal that, insofar as attention is needed for maintenance, processing times linearly increase at a rate of about 50 ms per verbal or visuospatial memory item, suggesting a very fast refresh rate in working memory. Our results also show an asymmetry between verbal and spatial information, in that spatial information can solely rely on attention for its maintenance while verbal information can also rely on a domain-specific maintenance mechanism independent from attention. The implications for the functioning of working memory are discussed, with a specific focus on how information is maintained in working memory. PsycINFO Database Record (c) 2014 APA, all rights reserved.

  15. Design and implementation of an interactive website to support long-term maintenance of weight loss.

    PubMed

    Stevens, Victor J; Funk, Kristine L; Brantley, Phillip J; Erlinger, Thomas P; Myers, Valerie H; Champagne, Catherine M; Bauck, Alan; Samuel-Hodge, Carmen D; Hollis, Jack F

    2008-01-25

    For most individuals, long-term maintenance of weight loss requires long-term, supportive intervention. Internet-based weight loss maintenance programs offer considerable potential for meeting this need. Careful design processes are required to maximize adherence and minimize attrition. This paper describes the development, implementation and use of a Web-based intervention program designed to help those who have recently lost weight sustain their weight loss over 1 year. The weight loss maintenance website was developed over a 1-year period by an interdisciplinary team of public health researchers, behavior change intervention experts, applications developers, and interface designers. Key interactive features of the final site include social support, self-monitoring, written guidelines for diet and physical activity, links to appropriate websites, supportive tools for behavior change, check-in accountability, tailored reinforcement messages, and problem solving and relapse prevention training. The weight loss maintenance program included a reminder system (automated email and telephone messages) that prompted participants to return to the website if they missed their check-in date. If there was no log-in response to the email and telephone automated prompts, a staff member called the participant. We tracked the proportion of participants with at least one log-in per month, and analyzed log-ins as a result of automated prompts. The mean age of the 348 participants enrolled in an ongoing randomized trial and assigned to use the website was 56 years; 63% were female, and 38% were African American. While weight loss data will not be available until mid-2008, website use remained high during the first year with over 80% of the participants still using the website during month 12. During the first 52 weeks, participants averaged 35 weeks with at least one log-in. Email and telephone prompts appear to be very effective at helping participants sustain ongoing website use. Developing interactive websites is expensive, complex, and time consuming. We found that extensive paper prototyping well in advance of programming and a versatile product manager who could work with project staff at all levels of detail were essential to keeping the development process efficient. clinicaltrials.gov NCT00054925.

  16. Prevention of needless deaths from drowning.

    PubMed

    Modell, Jerome H

    2010-07-01

    To determine whether faulty pool maintenance and substandard lifeguard performance critically delayed retrieval and resuscitation of a significant number of pool drowning victims. One hundred and eighty drowning incidents that resulted in litigation from 1998 to 2008 were studied to determine whether faulty pool maintenance and/or substandard lifeguard performance delayed retrieval and thereby contributed to the death of these persons. A total of 180 swimming pools-commercial and private-were included. Ninety-seven of these pools were manned by lifeguards. Subjects who underwent the drowning process and suffered severe brain injury or death were reviewed to determine the rescue and resuscitation attempts by lifeguards or bystanders at the pool. One hundred and seventy-seven of the 180 persons who underwent the drowning process died. Cases were analyzed as to whether faulty pool maintenance and/or substandard lifeguard performance contributed to their demise. At fault were cloudy or dirty water; drain pipes that created underwater suction to trap victims; inadequate fencing around pools through which small children gained access; permitting small children to be at the pool without adult supervision; permitting dangerous exercises such as hyperventilation while underwater swimming, resulting in shallow water blackout; lifeguards not being attentive, being distracted by other persons, performing nonrelated chores, leaving their positions without proper relief, while failure to enter the water when told persons were submerged. Faculty pool maintenance and substandard lifeguard performance critically delayed retrieval and resuscitation of a significant number of pool drowning victims.

  17. Brain activity related to working memory for temporal order and object information.

    PubMed

    Roberts, Brooke M; Libby, Laura A; Inhoff, Marika C; Ranganath, Charan

    2017-06-08

    Maintaining items in an appropriate sequence is important for many daily activities; however, remarkably little is known about the neural basis of human temporal working memory. Prior work suggests that the prefrontal cortex (PFC) and medial temporal lobe (MTL), including the hippocampus, play a role in representing information about temporal order. The involvement of these areas in successful temporal working memory, however, is less clear. Additionally, it is unknown whether regions in the PFC and MTL support temporal working memory across different timescales, or at coarse or fine levels of temporal detail. To address these questions, participants were scanned while completing 3 working memory task conditions (Group, Position and Item) that were matched in terms of difficulty and the number of items to be actively maintained. Group and Position trials probed temporal working memory processes, requiring the maintenance of hierarchically organized coarse and fine temporal information, respectively. To isolate activation related to temporal working memory, Group and Position trials were contrasted against Item trials, which required detailed working memory maintenance of visual objects. Results revealed that working memory encoding and maintenance of temporal information relative to visual information was associated with increased activation in dorsolateral PFC (DLPFC), and perirhinal cortex (PRC). In contrast, maintenance of visual details relative to temporal information was characterized by greater activation of parahippocampal cortex (PHC), medial and anterior PFC, and retrosplenial cortex. In the hippocampus, a dissociation along the longitudinal axis was observed such that the anterior hippocampus was more active for working memory encoding and maintenance of visual detail information relative to temporal information, whereas the posterior hippocampus displayed the opposite effect. Posterior parietal cortex was the only region to show sensitivity to temporal working memory across timescales, and was particularly involved in the encoding and maintenance of fine temporal information relative to maintenance of temporal information at more coarse timescales. Collectively, these results highlight the involvement of PFC and MTL in temporal working memory processes, and suggest a dissociation in the type of working memory information represented along the longitudinal axis of the hippocampus. Copyright © 2017 Elsevier B.V. All rights reserved.

  18. STS-57 inflight maintenance (IFM) tool tray at Boeing FEPF bench review

    NASA Technical Reports Server (NTRS)

    1993-01-01

    STS-57 inflight maintenance (IFM) tool tray is displayed on a table top during the bench review at Boeing's Flight Equipment Processing Facility (FEPF) located near JSC. The tool tray will be located on Endeavour's, Orbiter Vehicle (OV) 105's, middeck in forward locker MF57K and includes modified forceps, L-shaped hex wrenches, jeweler screwdrivers, adjustable wrench, bone saw, combination wrenches, override devices, switch guards, tape measure, torque driver, short screwdriver, long screwdriver, phillips screwdrivers, ratchet wrench, needlenose pliers, torque tips, adapter, universal joint, deepwell sockets, sockets, driver handle, seat adjustment tool, extensions, torque wrench, allen head drivers, hacksaw, and blades. Photo taken by NASA JSC contract photographer Benny Benavides.

  19. Grounds Maintenance Equipment and Procedures. Building Maintenance. Module VI. Instructor's Guide.

    ERIC Educational Resources Information Center

    Crank, Virgil

    This curriculum guide, one of six modules keyed to the building maintenance competency profile developed by industry and education professionals, provides materials for two units on grounds maintenance equipment and procedures. The first unit deals with grounds maintenance equipment and includes the following lessons: safety; changing oil/filter…

  20. 40 CFR 63.1187 - What do I need to know about operations, maintenance, and monitoring plans?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations, maintenance, and monitoring plans? 63.1187 Section 63.1187 Protection of Environment... about operations, maintenance, and monitoring plans? (a) An operations, maintenance, and monitoring plan... title V permit. (b) The operations, maintenance, and monitoring plan must include the following: (1...

  1. 40 CFR 1051.125 - What maintenance instructions must I give to buyers?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... maintenance steps to address engine operation that is not atypical, or that the maintenance is unlikely to... (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM RECREATIONAL ENGINES AND VEHICLES Emission... maintenance step, recommend the maximum feasible interval for this maintenance, include your rationale with...

  2. Description and Results of the Air Force Research and Development Program for the Improvement of Maintenance Efficiency.

    ERIC Educational Resources Information Center

    Foley, John P., Jr.

    An overview of the Air Force's Research and Development Program for the Improvement of Maintenance Efficiency is provided. First described are the steps found in any detailed task analysis, a process which results in the complete specification of each task involved in an overall maintenance effort. The factors influencing maintenance effectiveness…

  3. Maintenance Process Strategic Analysis

    NASA Astrophysics Data System (ADS)

    Jasiulewicz-Kaczmarek, M.; Stachowiak, A.

    2016-08-01

    The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.

  4. Engagement in New Dietary Habits-Obese Women's Experiences from Participating in a 2-Year Diet Intervention.

    PubMed

    Ahlgren, Christina; Hammarström, Anne; Sandberg, Susanne; Lindahl, Bernt; Olsson, Tommy; Larsson, Christel; Fjellman-Wiklund, Anncristine

    2016-02-01

    Dietary weight loss interventions most often result in weight loss, but weight maintenance on a long-term basis is the main problem in obesity treatment. There is a need for an increased understanding of the behaviour patterns involved in adopting a new dietary behavior and to maintain the behaviour over time. The purpose of this paper is to explore overweight and obese middle-aged women's experiences of the dietary change processes when participating in a 2-year-long diet intervention. Qualitative semi-structured interviews with 12 overweight and obese women (54-71 years) were made after their participation in a diet intervention programme. The programme was designed as a RCT study comparing a diet according to the Nordic nutrition recommendations (NNR diet) and a Palaeolithic diet (PD). Interviews were analysed according to Grounded Theory principles. A core category "Engagement phases in the process of a diet intervention" concluded the analysis. Four categories included the informants' experiences during different stages of the process of dietary change: "Honeymoon phase", "Everyday life phase", "It's up to you phase" and "Crossroads phase". The early part of the intervention period was called "Honeymoon phase" and was characterised by positive experiences, including perceived weight loss and extensive support. The next phases, the "Everyday life phase" and "It's up to you phase", contained the largest obstacles to change. The home environment appeared as a crucial factor, which could be decisive for maintenance of the new dietary habits or relapse into old habits in the last phase called "Crossroads phase". We identified various phases of engagement in the process of a long-term dietary intervention among middle-aged women. A clear personal goal and support from family and friends seem to be of major importance for long-term maintenance of new dietary habits. Gender relations within the household must be considered as a possible obstacle for women engaging in diet intervention.

  5. Analysis of Railroad Track Maintenance Expenditures for Class I Railroads 1962-1977

    DOT National Transportation Integrated Search

    1982-02-01

    This study investigates the decision-making process for railroad track maintenance (T/M) expenditures. The objectives are to (1) describe how Federal track safety standards have influenced this process and (2) try to predict the impact of changes in ...

  6. "You Can't Hustle All Your Life": An Exploratory Investigation of the Exit Process among Street-Level Prostituted Women

    ERIC Educational Resources Information Center

    Dalla, Rochelle L.

    2006-01-01

    Between 1998 and 1999, 43 street-level prostituted women were interviewed regarding their developmental experiences, including prostitution entry, maintenance, and exit attempts. Three years later, 18 of the original 43 participants were located and interviewed. This exploratory follow-up investigation focused on the women's life experiences…

  7. Ecological genetics of the Bromus tectorum (Poaceae) - Ustilago Bullata (Ustilaginaceae): A role for frequency dependent selection?

    Treesearch

    Susan E. Meyer; David L. Nelson; Suzette Clement; Alisa Ramakrishnan

    2010-01-01

    Evolutionary processes that maintain genetic diversity in plants are likely to include selection imposed by pathogens. Negative frequency-dependent selection is a mechanism for maintenance of resistance polymorphism in plant - pathogen interactions. We explored whether such selection operates in the Bromus tectorum - Ustilago bullata pathosystem. Gene-for-gene...

  8. Soil and Water Indicators of the Sustainable Rangelands Roundtable

    Treesearch

    M.G. Sherm Karl; D.A. Pyke; P.T. Tueller; G.E. Schuman; R.W. Shafer; S.J. Borchard; D.T. Booth; W.G. Ypsilantis; R.H. Jr. Barrett

    2006-01-01

    The Sustainable Rangelands Roundtable (SRR) has explicitly included conservation and maintenance of soil and water resources as a criterion, a category of conditions or processes that can be assessed nationally to determine if the current level of rangeland management will ensure sustainability. Within the soil/water criterion, 10 indicators, 5 soil-based and 5 water-...

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jain, Abhilasha, E-mail: abhilasha.vnit@gmail.com; Kumar, Ashwini; Peshwe, D. R.

    Rare earth activated hybrid phosphors have made significant progress in terms of better light output, color properties and potential for long life. All these features coupled with low cost production and reduced maintenance have offered phosphor converted LEDs for diverse optoelectronic applications including signal lighting in advanced aviation. The present paper explores the effect of various processing parameters on luminescent hybrid phosphors fabricated through combustion synthesis.

  10. Hydrology and landscape connectivity of vernal pools. Chapter 3.

    Treesearch

    Scott G. Liebowitz; Robert T. Brooks

    2008-01-01

    Hydrology is fundamental to wetland establishment and maintenance of wetland processes (Cole et al. 2002). Hydrology has been shown to affect, if not control, many aspects of wetland ecology, including litter decomposition and the accumulation of organic matter and sediment (Barlocher et al. 1978), the composition and productivity of pool fauna (Paton and Couch 2002),...

  11. 40 CFR 65.3 - Compliance with standards and operation and maintenance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...)(4)(i) and (ii) do not apply to Group 2A or Group 2B process vents. Compliance with design, equipment... include, but are not limited to, air pollution control technologies, recovery technologies, work practices... control devices are not required but may be used if available. This paragraph (a)(3) does not apply to...

  12. 40 CFR 65.3 - Compliance with standards and operation and maintenance requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...)(4)(i) and (ii) do not apply to Group 2A or Group 2B process vents. Compliance with design, equipment... include, but are not limited to, air pollution control technologies, recovery technologies, work practices... control devices are not required but may be used if available. This paragraph (a)(3) does not apply to...

  13. Integrating fire management into land management planning for west-side forests

    Treesearch

    Peter D. Teensma

    1996-01-01

    Fire management's integration into land management planning is critical to the successful management of nearly all wildland ecosystems, including westside forests, which lie west of the Cascade crest in Oregon and the northern coastal ranges in California. Restoration and maintenance of fire as an ecosystem process is critical to retention of biological diversity...

  14. Reliability Centered Maintenance - Methodologies

    NASA Technical Reports Server (NTRS)

    Kammerer, Catherine C.

    2009-01-01

    Journal article about Reliability Centered Maintenance (RCM) methodologies used by United Space Alliance, LLC (USA) in support of the Space Shuttle Program at Kennedy Space Center. The USA Reliability Centered Maintenance program differs from traditional RCM programs because various methodologies are utilized to take advantage of their respective strengths for each application. Based on operational experience, USA has customized the traditional RCM methodology into a streamlined lean logic path and has implemented the use of statistical tools to drive the process. USA RCM has integrated many of the L6S tools into both RCM methodologies. The tools utilized in the Measure, Analyze, and Improve phases of a Lean Six Sigma project lend themselves to application in the RCM process. All USA RCM methodologies meet the requirements defined in SAE JA 1011, Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes. The proposed article explores these methodologies.

  15. Intervention planning for the REDUCE maintenance intervention: a digital intervention to reduce reulceration risk among patients with a history of diabetic foot ulcers

    PubMed Central

    Sivyer, Katy; Vedhara, Kavita; Yardley, Lucy; Game, Frances; Chalder, Trudie; Richards, Gayle; Drake, Nikki; Gray, Katie; Weinman, John; Bradbury, Katherine

    2018-01-01

    Objectives To develop a comprehensive intervention plan for the REDUCE maintenance intervention to support people who have had diabetic foot ulcers (DFUs) to sustain behaviours that reduce reulceration risk. Methods Theory-based, evidence-based and person-based approaches to intervention development were used. In phase I of intervention planning, evidence was collated from a scoping review of the literature and qualitative interviews with patients who have had DFUs (n=20). This was used to identify the psychosocial needs and challenges of this population and barriers and facilitators to the intervention’s target behaviours: regular foot checking, rapid self-referral in the event of changes in foot health, graded and regular physical activity and emotional management. In phase II, this evidence was combined with expert consultation to develop the intervention plan. Brief ‘guiding principles’ for shaping intervention development were created. ‘Behavioural analysis’ and ‘logic modelling’ were used to map intervention content onto behaviour change theory to comprehensively describe the intervention and its hypothesised mechanisms. Results Key challenges to the intervention’s target behaviours included patients’ uncertainty regarding when to self-refer, physical limitations affecting foot checking and physical activity and, for some, difficulties managing negative emotions. Important considerations for the intervention design included a need to increase patients’ confidence in making a self-referral and in using the maintenance intervention and a need to acknowledge that some intervention content might be relevant to only some patients (emotional management, physical activity). The behavioural analysis identified the following processes hypothesised to facilitate long-term behaviour maintenance including increasing patients’ skills, self-efficacy, knowledge, positive outcome expectancies, sense of personal control, social support and physical opportunity. Conclusions This research provides a transparent description of the intervention planning for the REDUCE maintenance intervention. It provides insights into potential barriers and facilitators to the target behaviours and potentially useful behaviour change techniques to use in clinical practice. PMID:29779008

  16. On-Orbit Maintenance Operations Strategy for the International Space Station - Concept and Implementation

    NASA Technical Reports Server (NTRS)

    Patterson, Linda P.

    2001-01-01

    The International Space Station (ISS) has an operational mission and profile that makes it a Logistics and Maintenance (L&M) support challenge different from previous programs. It is permanently manned, assembled on orbit, and multi-national. With this technical and operational challenge, a unique approach is needed to support the hardware and crew. The key is the integration of on-orbit and ground analysis, supply, maintenance, and crew training into a coherent functional process that supports ISS goals and objectives. To integrate all the necessary aspects of hardware and personnel to support on-orbit maintenance, a myriad of products and processes must be created and coordinated, such that the right resources are in the right place at the right time to ensure continued ISS functionality. This paper will familiarize the audience with ISS On-Orbit Maintenance (OOM) concepts and capabilities for different maintenance tasks and discuss some of the logic behind their selection. It will also identify the operational maintenance support responsibility split between the U.S. and the various International Partners (IPs).

  17. Leadership Maintenance: Filling the Gap for Leadership Competences

    ERIC Educational Resources Information Center

    Rajbhandari, Mani Man Singh; Rajbhandari, Smriti

    2015-01-01

    In this study, leadership maintenance employs psychological, sociological and physiological paradigms in creating a conducive environment for both leaders' and followers' well-being in educational settings. Leadership maintenance is an ongoing process, which entails the understanding of leader's cognitive complexity, relational approaches towards…

  18. Final Exam.

    ERIC Educational Resources Information Center

    Coullahan, Richard

    1998-01-01

    Explains the use of a maintenance-management assessment process that educational facility managers can use to improve facility conditions and to provide evidence for future capital investments in maintenance management. Discusses questions a maintenance-management audit can answer and describes how to analyze the data to gain maximum understanding…

  19. Human factors in aviation maintenance, phase 1 : progress report.

    DOT National Transportation Integrated Search

    1991-11-01

    This human factors research in aviation maintenance addresses four tasks including studies of organizational behavior, job and task analysis in maintenance and inspection, advanced technology for training, and the application of job aiding to mainten...

  20. 77 FR 73560 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Redesignation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... the Area. The maintenance plan includes an insignificance determination for the on-road motor vehicle... redesignation. The maintenance plan includes an insignificance determination for the on-road motor vehicle...) Nonattainment Area to Attainment and Approval of the Associated Maintenance Plan AGENCY: Environmental...

  1. Comprehensive Characterization of Minichromosome Maintenance Complex (MCM) Protein Interactions Using Affinity and Proximity Purifications Coupled to Mass Spectrometry.

    PubMed

    Dubois, Marie-Line; Bastin, Charlotte; Lévesque, Dominique; Boisvert, François-Michel

    2016-09-02

    The extensive identification of protein-protein interactions under different conditions is an important challenge to understand the cellular functions of proteins. Here we use and compare different approaches including affinity purification and purification by proximity coupled to mass spectrometry to identify protein complexes. We explore the complete interactome of the minichromosome maintenance (MCM) complex by using both approaches for all of the different MCM proteins. Overall, our analysis identified unique and shared interaction partners and proteins enriched for distinct biological processes including DNA replication, DNA repair, and cell cycle regulation. Furthermore, we mapped the changes in protein interactions of the MCM complex in response to DNA damage, identifying a new role for this complex in DNA repair. In summary, we demonstrate the complementarity of these approaches for the characterization of protein interactions within the MCM complex.

  2. Smart Screening System (S3) In Taconite Processing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daryoush Allaei; Ryan Wartman; David Tarnowski

    2006-03-01

    The conventional screening machines used in processing plants have had undesirable high noise and vibration levels. They also have had unsatisfactorily low screening efficiency, high energy consumption, high maintenance cost, low productivity, and poor worker safety. These conventional vibrating machines have been used in almost every processing plant. Most of the current material separation technology uses heavy and inefficient electric motors with an unbalanced rotating mass to generate the shaking. In addition to being excessively noisy, inefficient, and high-maintenance, these vibrating machines are often the bottleneck in the entire process. Furthermore, these motors, along with the vibrating machines and supportingmore » structure, shake other machines and structures in the vicinity. The latter increases maintenance costs while reducing worker health and safety. The conventional vibrating fine screens at taconite processing plants have had the same problems as those listed above. This has resulted in lower screening efficiency, higher energy and maintenance cost, and lower productivity and workers safety concerns. The focus of this work is on the design of a high performance screening machine suitable for taconite processing plants. SmartScreens{trademark} technology uses miniaturized motors, based on smart materials, to generate the shaking. The underlying technologies are Energy Flow Control{trademark} and Vibration Control by Confinement{trademark}. These concepts are used to direct energy flow and confine energy efficiently and effectively to the screen function. The SmartScreens{trademark} technology addresses problems related to noise and vibration, screening efficiency, productivity, and maintenance cost and worker safety. Successful development of SmartScreens{trademark} technology will bring drastic changes to the screening and physical separation industry. The final designs for key components of the SmartScreens{trademark} have been developed. The key components include smart motor and associated electronics, resonators, and supporting structural elements. It is shown that the smart motors have an acceptable life and performance. Resonator (or motion amplifier) designs are selected based on the final system requirement and vibration characteristics. All the components for a fully functional prototype are fabricated. The development program is on schedule. The last semi-annual report described the completion of the design refinement phase. This phase resulted in a Smart Screen design that meets performance targets both in the dry condition and with taconite slurry flow using PZT motors. This system was successfully demonstrated for the DOE and partner companies at the Coleraine Mineral Research Laboratory in Coleraine, Minnesota. Since then, the fabrication of the dry application prototype (incorporating an electromagnetic drive mechanism and a new deblinding concept) has been completed and successfully tested at QRDC's lab.« less

  3. Elaborative rehearsal of nontemporal information interferes with temporal processing of durations in the range of seconds but not milliseconds.

    PubMed

    Rammsayer, Thomas; Ulrich, Rolf

    2011-05-01

    The distinct timing hypothesis suggests a sensory mechanism for processing of durations in the range of milliseconds and a cognitively controlled mechanism for processing of longer durations. To test this hypothesis, we employed a dual-task approach to investigate the effects of maintenance and elaborative rehearsal on temporal processing of brief and long durations. Unlike mere maintenance rehearsal, elaborative rehearsal as a secondary task involved transfer of information from working to long-term memory and elaboration of information to enhance storage in long-term memory. Duration discrimination of brief intervals was not affected by a secondary cognitive task that required either maintenance or elaborative rehearsal. Concurrent elaborative rehearsal, however, impaired discrimination of longer durations as compared to maintenance rehearsal and a control condition with no secondary task. These findings endorse the distinct timing hypothesis and are in line with the notion that executive functions, such as continuous memory updating and active transfer of information into long-term memory interfere with temporal processing of durations in the second, but not in the millisecond range. 2011 Elsevier B.V. All rights reserved.

  4. [The maintenance of automatic analysers and associated documentation].

    PubMed

    Adjidé, V; Fournier, P; Vassault, A

    2010-12-01

    The maintenance of automatic analysers and associated documentation taking part in the requirements of the ISO 15189 Standard and the French regulation as well have to be defined in the laboratory policy. The management of the periodic maintenance and documentation shall be implemented and fulfilled. The organisation of corrective maintenance has to be managed to avoid interruption of the task of the laboratory. The different recommendations concern the identification of materials including automatic analysers, the environmental conditions to take into account, the documentation provided by the manufacturer and documents prepared by the laboratory including procedures for maintenance.

  5. Identifying the hazard characteristics of powder byproducts generated from semiconductor fabrication processes.

    PubMed

    Choi, Kwang-Min; An, Hee-Chul; Kim, Kwan-Sick

    2015-01-01

    Semiconductor manufacturing processes generate powder particles as byproducts which potentially could affect workers' health. The chemical composition, size, shape, and crystal structure of these powder particles were investigated by scanning electron microscopy equipped with an energy dispersive spectrometer, Fourier transform infrared spectrometry, and X-ray diffractometry. The powders generated in diffusion and chemical mechanical polishing processes were amorphous silica. The particles in the chemical vapor deposition (CVD) and etch processes were TiO(2) and Al(2)O(3), and Al(2)O(3) particles, respectively. As for metallization, WO(3), TiO(2), and Al(2)O(3) particles were generated from equipment used for tungsten and barrier metal (TiN) operations. In photolithography, the size and shape of the powder particles showed 1-10 μm and were of spherical shape. In addition, the powders generated from high-current and medium-current processes for ion implantation included arsenic (As), whereas the high-energy process did not include As. For all samples collected using a personal air sampler during preventive maintenance of process equipment, the mass concentrations of total airborne particles were < 1 μg, which is the detection limit of the microbalance. In addition, the mean mass concentrations of airborne PM10 (particles less than 10 μm in diameter) using direct-reading aerosol monitor by area sampling were between 0.00 and 0.02 μg/m(3). Although the exposure concentration of airborne particles during preventive maintenance is extremely low, it is necessary to make continuous improvements to the process and work environment, because the influence of chronic low-level exposure cannot be excluded.

  6. Earth observation archive activities at DRA Farnborough

    NASA Technical Reports Server (NTRS)

    Palmer, M. D.; Williams, J. M.

    1993-01-01

    Space Sector, Defence Research Agency (DRA), Farnborough have been actively involved in the acquisition and processing of Earth Observation data for over 15 years. During that time an archive of over 20,000 items has been built up. This paper describes the major archive activities, including: operation and maintenance of the main DRA Archive, the development of a prototype Optical Disc Archive System (ODAS), the catalog systems in use at DRA, the UK Processing and Archive Facility for ERS-1 data, and future plans for archiving activities.

  7. Crew interface specifications preparation for in-flight maintenance and stowage functions

    NASA Technical Reports Server (NTRS)

    Parker, F. W.; Carlton, B. E.

    1972-01-01

    The findings and data products developed during the Phase 2 crew interface specification study are presented. Five new NASA general specifications were prepared: operations location coding system for crew interfaces; loose equipment and stowage management requirements; loose equipment and stowage data base information requirements; spacecraft loose equipment stowage drawing requirements; and inflight stowage management data requirements. Additional data was developed defining inflight maintenance processes and related data concepts for inflight troubleshooting, remove/repair/replace and scheduled maintenance activities. The process of maintenance task and equipment definition during spacecraft design and development was also defined and related data concepts were identified for futher development into formal NASA specifications during future follow-on study phases of the contract.

  8. The impact of ageing and gender on visual mental imagery processes: A study of performance on tasks from the Complete Visual Mental Imagery Battery (CVMIB).

    PubMed

    Palermo, Liana; Piccardi, Laura; Nori, Raffaella; Giusberti, Fiorella; Guariglia, Cecilia

    2016-09-01

    In this study we aim to evaluate the impact of ageing and gender on different visual mental imagery processes. Two hundred and fifty-one participants (130 women and 121 men; age range = 18-77 years) were given an extensive neuropsychological battery including tasks probing the generation, maintenance, inspection, and transformation of visual mental images (Complete Visual Mental Imagery Battery, CVMIB). Our results show that all mental imagery processes with the exception of the maintenance are affected by ageing, suggesting that other deficits, such as working memory deficits, could account for this effect. However, the analysis of the transformation process, investigated in terms of mental rotation and mental folding skills, shows a steeper decline in mental rotation, suggesting that age could affect rigid transformations of objects and spare non-rigid transformations. Our study also adds to previous ones in showing gender differences favoring men across the lifespan in the transformation process, and, interestingly, it shows a steeper decline in men than in women in inspecting mental images, which could partially account for the mixed results about the effect of ageing on this specific process. We also discuss the possibility to introduce the CVMIB in clinical assessment in the context of theoretical models of mental imagery.

  9. Maintenance of phenotypic variation: repeatibility, heritability, and size-dependent processes in a wild brook trout population

    Treesearch

    Benjamin H. Letcher; Jason A Coombs; Keith H. Nislow

    2011-01-01

    Phenotypic variation in body size can result from within-cohort variation in birth dates, among-individual growth variation and size-selective processes. We explore the relative effects of these processes on the maintenance of wide observed body size variation in stream-dwelling brook trout (Salvelinus fontinalis). Based on the analyses of multiple...

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anastasia M. Gribik; Ronald E. Mizia; Harry Gatley

    This project addresses both the technical and economic feasibility of replacing industrial gas in lime kilns with synthesis gas from the gasification of hog fuel. The technical assessment includes a materials evaluation, processing equipment needs, and suitability of the heat content of the synthesis gas as a replacement for industrial gas. The economic assessment includes estimations for capital, construction, operating, maintenance, and management costs for the reference plant. To perform these assessments, detailed models of the gasification and lime kiln processes were developed using Aspen Plus. The material and energy balance outputs from the Aspen Plus model were used asmore » inputs to both the material and economic evaluations.« less

  11. Development of a wheelchair maintenance training programme and questionnaire for clinicians and wheelchair users.

    PubMed

    Toro, Maria Luisa; Bird, Emily; Oyster, Michelle; Worobey, Lynn; Lain, Michael; Bucior, Samuel; Cooper, Rory A; Pearlman, Jonathan

    2017-11-01

    Purpose of state: The aims of this study were to develop a Wheelchair Maintenance Training Programme (WMTP) as a tool for clinicians to teach wheelchair users (and caregivers when applicable) in a group setting to perform basic maintenance at home in the USA and to develop a Wheelchair Maintenance Training Questionnaire (WMT-Q) to evaluate wheelchair maintenance knowledge in clinicians, manual and power wheelchair users. The WMTP and WMT-Q were developed through an iterative process. A convenience sample of clinicians (n = 17), manual wheelchair (n ∞ 5), power wheelchair users (n = 4) and caregivers (n = 4) provided feedback on the training programme. A convenience sample of clinicians (n = 38), manual wheelchair (n = 25), and power wheelchair users (n = 30) answered the WMT-Q throughout different phases of development. The subscores of the WMT-Q achieved a reliability that ranged between ICC(3,1) = 0.48 to ICC(3,1) = 0.89. The WMTP and WMT-Q were implemented with 15 clinicians who received in-person training in the USA using the materials developed and showed a significant increase in all except one of the WMT-Q subscores after the WMTP (p < 0.007). The WMTP will continue to be revised as it is further implemented. The WMT-Q is an acceptable instrument to measure pre- and post-training maintenance knowledge. Implications for Rehabilitation The Wheelchair Maintenance Training Program can be used to educate rehabilitation clinicians and technicians to improve wheelchair service and delivery to end users. This training complements the World Health Organization basic wheelchair service curriculum, which only includes training of the clinicians, but does not include detailed information to train wheelchair users and caregivers. This training program offers a time efficient method for providing education to end users in a group setting that may mitigate adverse consequences resulting from wheelchair breakdown. This training program has significant potential for impact among wheelchair users in areas where access to repair services is limited.

  12. RCT of a Psychological Intervention for Patients With Cancer: I. Mechanisms of Change

    PubMed Central

    Andersen, Barbara L.; Shelby, Rebecca A.; Golden-Kreutz, Deanna M.

    2008-01-01

    Little is known about the therapeutic processes contributing to efficacy of psychological interventions for patients with cancer. Data from a randomized clinical trial yielding robust biobehavioral and health effects (B. L. Andersen et al., 2004, 2007) were used to examine associations between process variables, treatment utilization, and outcomes. Novel findings emerged. Patients were highly satisfied with the treatment, but their higher levels of felt support (group cohesion) covaried with lower distress and fewer symptoms. Also, specific. treatment strategies were associated with specific outcomes, including lower distress, improved dietary habits, reduced symptomatology, and higher chemotherapy dose intensity. These data provide a comprehensive test of multiple therapeutic processes and mechanisms for biobehavioral change with an intervention including both intensive and maintenance phases. PMID:18085909

  13. Reliability centered maintenance : a case study of railway transit maintenance to achieve optimal performance.

    DOT National Transportation Integrated Search

    2010-12-01

    The purpose of this qualitative case study was to identify the types of obstacles and patterns experienced by a single heavy rail transit agency located in North America that embedded a Reliability Centered Maintenance (RCM) Process. The outcome of t...

  14. The Development and Evaluation of the Psychometric Properties of the Negative Beliefs about Post-Event Processing Scale.

    PubMed

    Rodriguez, Hayley; Kissell, Kellie; Lucas, Lloyd; Fisak, Brian

    2017-11-01

    Although negative beliefs have been found to be associated with worry symptoms and depressive rumination, negative beliefs have yet to be examined in relation to post-event processing and social anxiety symptoms. The purpose of the current study was to examine the psychometric properties of the Negative Beliefs about Post-Event Processing Questionnaire (NB-PEPQ). A large, non-referred undergraduate sample completed the NB-PEPQ along with validation measures, including a measure of post-event processing and social anxiety symptoms. Based on factor analysis, a single-factor model was obtained, and the NB-PEPQ was found to exhibit good validity, including positive associations with measures of post-event processing and social anxiety symptoms. These findings add to the literature on the metacognitive variables that may lead to the development and maintenance of post-event processing and social anxiety symptoms, and have relevant clinical applications.

  15. Excess thyroid hormone inhibits embryonic neural stem/progenitor cells proliferation and maintenance through STAT3 signalling pathway.

    PubMed

    Chen, Chunhai; Zhou, Zhou; Zhong, Min; Li, Maoquan; Yang, Xuesen; Zhang, Yanwen; Wang, Yuan; Wei, Aimin; Qu, Mingyue; Zhang, Lei; Xu, Shangcheng; Chen, Shude; Yu, Zhengping

    2011-07-01

    Hyperthyroidism is prevalent during pregnancy, but little is known about the effects of excess thyroid hormone on the development of embryonic neural stem/progenitor cells (NSCs), and the mechanisms underlying these effects. Previous studies indicate that STAT3 plays a crucial role in determining NSC fate during neurodevelopment. In this study, we investigated the effects of a supraphysiological dose of 3,5,3'-L-triiodothyronine (T3) on the proliferation and maintenance of NSCs derived from embryonic day 13.5 mouse neocortex, and the involvement of STAT3 in this process. Our results suggest that excess T3 treatment inhibits NSC proliferation and maintenance. T3 decreased tyrosine phosphorylation of JAK1, JAK2 and STAT3, and subsequently inhibited STAT3-DNA binding activity. Furthermore, proliferation and maintenance of NSCs were decreased by inhibitors of JAKs and STAT3, indicating that the STAT3 signalling pathway is involved in the process of NSC proliferation and maintenance. Taken together, these results suggest that the STAT3 signalling pathway is involved in the process of T3-induced inhibition of embryonic NSC proliferation and maintenance. These findings provide data for understanding the effects of hyperthyroidism during pregnancy on fetal brain development, and the mechanisms underlying these effects.

  16. Performance of a Water Recirculation Loop Maintenance Device and Process for the Advanced Spacesuit Water Membrane Evaporator

    NASA Technical Reports Server (NTRS)

    Rector, Tony; Steele, John W.; Bue, Grant C.; Campbell, Colin; Makinen, Janice

    2012-01-01

    A water loop maintenance device and process to maintain the water quality of the Advanced Spacesuit Water Membrane Evaporation (SWME) water recirculation loop has been undergoing a performance evaluation. The SWME is a heat rejection device under development at the NASA Johnson Space Center to perform thermal control for advanced spacesuits. One advantage to this technology is the potential for a significantly greater degree of tolerance to contamination when compared to the existing Sublimator technology. The driver for the water recirculation maintenance device and process is to further enhance this advantage through the leveraging of fluid loop management lessons-learned from the International Space Station (ISS). A bed design that was developed for a Hamilton Sundstrand military application, and considered for a potential ISS application with the Urine Processor Assembly, provides a low pressure drop means for water maintenance in a recirculation loop. The bed design is coupled with high capacity ion exchange resins, organic adsorbents, and a cyclic methodology developed for the Extravehicular Mobility Unit (EMU) Transport Water loop. The maintenance process further leverages a sorbent developed for ISS that introduces a biocide in a microgravity-compatible manner for the Internal Active Thermal Control System (IATCS). The leveraging of these water maintenance technologies to the SWME recirculation loop is a unique demonstration of applying the valuable lessons learned on the ISS to the next generation of manned spaceflight Environmental Control and Life Support System (ECLSS) hardware. This

  17. Autophagy: a new player in skeletal maintenance?

    PubMed

    Hocking, Lynne J; Whitehouse, Caroline; Helfrich, Miep H

    2012-07-01

    Imbalances between bone resorption and formation lie at the root of disorders such as osteoporosis, Paget's disease of bone (PDB), and osteopetrosis. Recently, genetic and functional studies have implicated proteins involved in autophagic protein degradation as important mediators of bone cell function in normal physiology and in pathology. Autophagy is the conserved process whereby aggregated proteins, intracellular pathogens, and damaged organelles are degraded and recycled. This process is important both for normal cellular quality control and in response to environmental or internal stressors, particularly in terminally-differentiated cells. Autophagic structures can also act as hubs for the spatial organization of recycling and synthetic process in secretory cells. Alterations to autophagy (reduction, hyperactivation, or impairment) are associated with a number of disorders, including neurodegenerative diseases and cancers, and are now being implicated in maintenance of skeletal homoeostasis. Here, we introduce the topic of autophagy, describe the new findings that are starting to emerge from the bone field, and consider the therapeutic potential of modifying this pathway for the treatment of age-related bone disorders. Copyright © 2012 American Society for Bone and Mineral Research.

  18. Automatic programming for critical applications

    NASA Technical Reports Server (NTRS)

    Loganantharaj, Raj L.

    1988-01-01

    The important phases of a software life cycle include verification and maintenance. Usually, the execution performance is an expected requirement in a software development process. Unfortunately, the verification and the maintenance of programs are the time consuming and the frustrating aspects of software engineering. The verification cannot be waived for the programs used for critical applications such as, military, space, and nuclear plants. As a consequence, synthesis of programs from specifications, an alternative way of developing correct programs, is becoming popular. The definition, or what is understood by automatic programming, has been changed with our expectations. At present, the goal of automatic programming is the automation of programming process. Specifically, it means the application of artificial intelligence to software engineering in order to define techniques and create environments that help in the creation of high level programs. The automatic programming process may be divided into two phases: the problem acquisition phase and the program synthesis phase. In the problem acquisition phase, an informal specification of the problem is transformed into an unambiguous specification while in the program synthesis phase such a specification is further transformed into a concrete, executable program.

  19. Associations between poor sleep quality and stages of change of multiple health behaviors among participants of employee wellness program

    PubMed Central

    Hui, Siu-kuen Azor; Grandner, Michael A.

    2015-01-01

    Objective Using the Transtheoretical Model of behavioral change, this study evaluates the relationship between sleep quality and the motivation and maintenance processes of healthy behavior change. Methods The current study is an analysis of data collected in 2008 from an online health risk assessment (HRA) survey completed by participants of the Kansas State employee wellness program (N = 13,322). Using multinomial logistic regression, associations between self-reported sleep quality and stages of change (i.e. precontemplation, contemplation, preparation, action, maintenance) in five health behaviors (stress management, weight management, physical activities, alcohol use, and smoking) were analyzed. Results Adjusted for covariates, poor sleep quality was associated with an increased likelihood of contemplation, preparation, and in some cases action stage when engaging in the health behavior change process, but generally a lower likelihood of maintenance of the healthy behavior. Conclusions The present study demonstrated that poor sleep quality was associated with an elevated likelihood of contemplating or initiating behavior change, but a decreased likelihood of maintaining healthy behavior change. It is important to include sleep improvement as one of the lifestyle management interventions offered in EWP to comprehensively reduce health risks and promote the health of a large employee population. PMID:26046013

  20. Maintenance of Social Anxiety in Stuttering: A Cognitive-Behavioral Model.

    PubMed

    Iverach, Lisa; Rapee, Ronald M; Wong, Quincy J J; Lowe, Robyn

    2017-05-17

    Stuttering is a speech disorder frequently accompanied by anxiety in social-evaluative situations. A growing body of research has confirmed a significant rate of social anxiety disorder among adults who stutter. Social anxiety disorder is a chronic and disabling anxiety disorder associated with substantial life impairment. Several influential models have described cognitive-behavioral factors that contribute to the maintenance of social anxiety in nonstuttering populations. The purpose of the present article is to apply these leading models to the experience of social anxiety for people who stutter. Components from existing models were applied to stuttering in order to determine cognitive-behavioral processes that occur before, during, and after social-evaluative situations, which may increase the likelihood of stuttering-related social fears persisting. Maintenance of social anxiety in stuttering may be influenced by a host of interrelated factors, including fear of negative evaluation, negative social-evaluative cognitions, attentional biases, self-focused attention, safety behaviors, and anticipatory and postevent processing. Given the chronic nature of social anxiety disorder, identifying factors that contribute to the persistence of stuttering-related social fears has the potential to inform clinical practice and the development of psychological treatment programs to address the speech and psychological needs of people who stutter with social anxiety.

  1. Review of Procurement Practices in the Montgomery County Public Schools. Final Report.

    ERIC Educational Resources Information Center

    Touche Ross and Co., Washington, DC.

    Following a management summary and introduction, chapters 3 and 4 of this report present findings and recommendations related to the Montgomery County, Maryland, Public Schools process of procuring supplies and equipment (food supplies, fuel oil, warehouse supplies, and maintenance parts) and contractual services (data processing maintenance,…

  2. Zinc thermal spray coatings for reinforced concrete: An AWS process standard

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sulit, R.A.

    Zinc and aluminum thermal spray coatings (TSC) have been used for lining concrete weir in Great Britain since the 1950`s to maintain the dimensions of the weir for flow control concomitant with reduced wear and erosion of the concrete surfaces. This paper reports the development and the content of the ANSI/AWS C2.20-XX standard for the application of An TSC on concrete using flame and arc spray processes. This standard is formatted as an industrial process instruction: job description; safety; feedstock materials; equipment; a step-by-step method for surface preparation, thermal spraying; quality control; repair and maintenance of surface preparation, thermal spraying;more » quality control; repair and maintenance of Zn TSC on concrete; and a Job Control Record. Job planning and training and certification requirements are presented for An TSC inspectors and thermal spray operators. Four annexes are included in the standard: (a) historical summary of Zn TSC on concrete (b) sample job control record; (c) thermal spray operator qualification; and (d) portable adhesion testing for An TSC on concrete. This standard is based on the current literature and industrial equipment, process, and practices.« less

  3. The Influence of Software Complexity on the Maintenance Effort: Case Study on Software Developed within Educational Process

    ERIC Educational Resources Information Center

    Radulescu, Iulian Ionut

    2006-01-01

    Software complexity is the most important software quality attribute and a very useful instrument in the study of software quality. Is one of the factors that affect most of the software quality characteristics, including maintainability. It is very important to quantity this influence and identify the means to keep it under control; by using…

  4. A landscape plan based on historical fire regimes for a managed forest ecosystem: the Augusta Creek study.

    Treesearch

    John H. Cissel; Frederick J. Swanson; Gordon E. Grant; Deanna H. Olson; Gregory V. Stanley; Steven L. Garman; Linda R. Ashkenas; Matthew G. Hunter; Jane A. Kertis; James H. Mayo; Michelle D. McSwain; Sam G. Swetland; Keith A. Swindle; David O. Wallin

    1998-01-01

    The Augusta Creek project was initiated to establish and integrate landscape and watershed objectives into a landscape plan to guide management activities within a 7600-hectare (19,000-acre) planning area in western Oregon. Primary objectives included the maintenance of native species, ecosystem processes and structures, and long-term ecosystem productivity in a...

  5. Developing a Continuous Improvement System

    DTIC Science & Technology

    2016-09-16

    disagree that continuous improvement is critical to an organization’s suc-cess, since conducting business using a status quo philosophy will not work...for implementing one of these processes include: better operational efficiency, increased customer satisfaction, improved employee morale ...when a problem in reliability or maintenance may become the greatest opportunity. As described in the January-February 2011 issue of Defense AT&L

  6. Image quality specification and maintenance for airborne SAR

    NASA Astrophysics Data System (ADS)

    Clinard, Mark S.

    2004-08-01

    Specification, verification, and maintenance of image quality over the lifecycle of an operational airborne SAR begin with the specification for the system itself. Verification of image quality-oriented specification compliance can be enhanced by including a specification requirement that a vendor provide appropriate imagery at the various phases of the system life cycle. The nature and content of the imagery appropriate for each stage of the process depends on the nature of the test, the economics of collection, and the availability of techniques to extract the desired information from the data. At the earliest lifecycle stages, Concept and Technology Development (CTD) and System Development and Demonstration (SDD), the test set could include simulated imagery to demonstrate the mathematical and engineering concepts being implemented thus allowing demonstration of compliance, in part, through simulation. For Initial Operational Test and Evaluation (IOT&E), imagery collected from precisely instrumented test ranges and targets of opportunity consisting of a priori or a posteriori ground-truthed cultural and natural features are of value to the analysis of product quality compliance. Regular monitoring of image quality is possible using operational imagery and automated metrics; more precise measurements can be performed with imagery of instrumented scenes, when available. A survey of image quality measurement techniques is presented along with a discussion of the challenges of managing an airborne SAR program with the scarce resources of time, money, and ground-truthed data. Recommendations are provided that should allow an improvement in the product quality specification and maintenance process with a minimal increase in resource demands on the customer, the vendor, the operational personnel, and the asset itself.

  7. Dietary polyphenols and chromatin remodeling.

    PubMed

    Russo, Gian Luigi; Vastolo, Viviana; Ciccarelli, Marco; Albano, Luigi; Macchia, Paolo Emidio; Ungaro, Paola

    2017-08-13

    Polyphenols are the most abundant phytochemicals in fruits, vegetables, and plant-derived beverages. Recent findings suggest that polyphenols display the ability to reverse adverse epigenetic regulation involved in pathological conditions, such as obesity, metabolic disorder, cardiovascular and neurodegenerative diseases, and various forms of cancer. Epigenetics, defined as heritable changes to the transcriptome, independent from those occurring in the genome, includes DNA methylation, histone modifications, and posttranscriptional gene regulation by noncoding RNAs. Sinergistically and cooperatively, these processes regulate gene expression by changing chromatin organization and DNA accessibility. Such induced epigenetic changes can be inherited during cell division, resulting in permanent maintenance of the acquired phenotype, but they may also occur throughout an individual life-course and may ultimately influence phenotypic outcomes (health and disease risk). In the last decade, a number of studies have shown that nutrients can affect metabolic traits by altering the structure of chromatin and directly regulate both transcription and translational processes. In this context, dietary polyphenol-targeted epigenetics becomes an attractive approach for disease prevention and intervention. Here, we will review how polyphenols, including flavonoids, curcuminoids, and stilbenes, modulate the establishment and maintenance of key epigenetic marks, thereby influencing gene expression and, hence, disease risk and health.

  8. 21 CFR 211.58 - Maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 4 2012-04-01 2012-04-01 false Maintenance. 211.58 Section 211.58 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL... Maintenance. Any building used in the manufacture, processing, packing, or holding of a drug product shall be...

  9. 21 CFR 211.58 - Maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 4 2013-04-01 2013-04-01 false Maintenance. 211.58 Section 211.58 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL... Maintenance. Any building used in the manufacture, processing, packing, or holding of a drug product shall be...

  10. 21 CFR 211.58 - Maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Maintenance. 211.58 Section 211.58 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL... Maintenance. Any building used in the manufacture, processing, packing, or holding of a drug product shall be...

  11. 21 CFR 211.58 - Maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 4 2014-04-01 2014-04-01 false Maintenance. 211.58 Section 211.58 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL... Maintenance. Any building used in the manufacture, processing, packing, or holding of a drug product shall be...

  12. 21 CFR 211.58 - Maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 4 2011-04-01 2011-04-01 false Maintenance. 211.58 Section 211.58 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL... Maintenance. Any building used in the manufacture, processing, packing, or holding of a drug product shall be...

  13. Cognitive Load and Maintenance Rehearsal.

    ERIC Educational Resources Information Center

    Naveh-Benjamin, Moshe; and Jonides, John

    1984-01-01

    Studies the much-debated issue of the role of rote, repetitive rehearsal (maintenance rehearsal) on the establishment of memory traces that outlast the rehearsal process itself. Results show that there is an effect of maintenance rehearsal on long-term recognition performance and that this effect depends on the mental resources devoted to the…

  14. Research on gesture recognition of augmented reality maintenance guiding system based on improved SVM

    NASA Astrophysics Data System (ADS)

    Zhao, Shouwei; Zhang, Yong; Zhou, Bin; Ma, Dongxi

    2014-09-01

    Interaction is one of the key techniques of augmented reality (AR) maintenance guiding system. Because of the complexity of the maintenance guiding system's image background and the high dimensionality of gesture characteristics, the whole process of gesture recognition can be divided into three stages which are gesture segmentation, gesture characteristic feature modeling and trick recognition. In segmentation stage, for solving the misrecognition of skin-like region, a segmentation algorithm combing background mode and skin color to preclude some skin-like regions is adopted. In gesture characteristic feature modeling of image attributes stage, plenty of characteristic features are analyzed and acquired, such as structure characteristics, Hu invariant moments features and Fourier descriptor. In trick recognition stage, a classifier based on Support Vector Machine (SVM) is introduced into the augmented reality maintenance guiding process. SVM is a novel learning method based on statistical learning theory, processing academic foundation and excellent learning ability, having a lot of issues in machine learning area and special advantages in dealing with small samples, non-linear pattern recognition at high dimension. The gesture recognition of augmented reality maintenance guiding system is realized by SVM after the granulation of all the characteristic features. The experimental results of the simulation of number gesture recognition and its application in augmented reality maintenance guiding system show that the real-time performance and robustness of gesture recognition of AR maintenance guiding system can be greatly enhanced by improved SVM.

  15. System-level biomechanical approach for the evaluation of term and preterm pregnancy maintenance.

    PubMed

    Mahmoud, Hussam; Wagoner Johnson, Amy; Chien, Edward K; Poellmann, Michael J; McFarlin, Barbara

    2013-02-01

    Preterm birth is the primary contributor to perinatal morbidity and mortality, with those born prior to 32 weeks disproportionately contributing compared to those born at 32-37 weeks. Outcomes for babies born prematurely can be devastating. Parturition is recognized as a mechanical process that involves the two processes that are required to initiate labor: rhythmic myometrial contractions and cervical remodeling with subsequent dilation. Studies of parturition tend to separate these two processes rather than evaluate them as a unified system. The mechanical property characterization of the cervix has been primarily performed on isolated cervical tissue, with an implied understanding of the contribution from the uterine corpus. Few studies have evaluated the function of the uterine corpus in the absence of myometrial contractions or in relationship to retaining the fetus. Therefore, the cervical-uterine interaction has largely been neglected in the literature. We suggest that a system-level biomechanical approach is needed to understand pregnancy maintenance. To that end, this paper has two main goals. One goal is to highlight the gaps in current knowledge that need to be addressed in order to develop any comprehensive and clinically relevant models of the system. The second goal is to illustrate the utility of finite element models in understanding pregnancy maintenance of the cervical-uterine system. The paper targets an audience that includes the reproductive biologist/clinician and the engineer/physical scientist interested in biomechanics and the system level behavior of tissues.

  16. Radar Unix: a complete package for GPR data processing

    NASA Astrophysics Data System (ADS)

    Grandjean, Gilles; Durand, Herve

    1999-03-01

    A complete package for ground penetrating radar data interpretation including data processing, forward modeling and a case history database consultation is presented. Running on an Unix operating system, its architecture consists of a graphical user interface generating batch files transmitted to a library of processing routines. This design allows a better software maintenance and the possibility for the user to run processing or modeling batch files by itself and differed in time. A case history data base is available and consists of an hypertext document which can be consulted by using a standard HTML browser. All the software specifications are presented through a realistic example.

  17. Laboratory services series: a programmed maintenance system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuxbury, D.C.; Srite, B.E.

    1980-01-01

    The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

  18. Fuel quality/processing study. Volume 4: On site processing studies

    NASA Technical Reports Server (NTRS)

    Jones, G. E., Jr.; Cutrone, M.; Doering, H.; Hickey, J.

    1981-01-01

    Fuel treated at the turbine and the turbine exhaust gas processed at the turbine site are studied. Fuel treatments protect the turbine from contaminants or impurities either in the upgrading fuel as produced or picked up by the fuel during normal transportation. Exhaust gas treatments provide for the reduction of NOx and SOx to environmentally acceptable levels. The impact of fuel quality upon turbine maintenance and deterioration is considered. On site costs include not only the fuel treatment costs as such, but also incremental costs incurred by the turbine operator if a turbine fuel of low quality is not acceptably upgraded.

  19. Smart Screening System (S3) In Taconite Processing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daryoush Allaei; Angus Morison; David Tarnowski

    2005-09-01

    The conventional screening machines used in processing plants have had undesirable high noise and vibration levels. They also have had unsatisfactorily low screening efficiency, high energy consumption, high maintenance cost, low productivity, and poor worker safety. These conventional vibrating machines have been used in almost every processing plant. Most of the current material separation technology uses heavy and inefficient electric motors with an unbalanced rotating mass to generate the shaking. In addition to being excessively noisy, inefficient, and high-maintenance, these vibrating machines are often the bottleneck in the entire process. Furthermore, these motors, along with the vibrating machines and supportingmore » structure, shake other machines and structures in the vicinity. The latter increases maintenance costs while reducing worker health and safety. The conventional vibrating fine screens at taconite processing plants have had the same problems as those listed above. This has resulted in lower screening efficiency, higher energy and maintenance cost, and lower productivity and workers safety concerns. The focus of this work is on the design of a high performance screening machine suitable for taconite processing plants. SmartScreens{trademark} technology uses miniaturized motors, based on smart materials, to generate the shaking. The underlying technologies are Energy Flow Control{trademark} and Vibration Control by Confinement{trademark}. These concepts are used to direct energy flow and confine energy efficiently and effectively to the screen function. The SmartScreens{trademark} technology addresses problems related to noise and vibration, screening efficiency, productivity, and maintenance cost and worker safety. Successful development of SmartScreens{trademark} technology will bring drastic changes to the screening and physical separation industry. The final designs for key components of the SmartScreens{trademark} have been developed. The key components include smart motor and associated electronics, resonators, and supporting structural elements. It is shown that the smart motors have an acceptable life and performance. Resonator (or motion amplifier) designs are selected based on the final system requirement and vibration characteristics. All the components for a fully functional prototype are fabricated. The development program is on schedule. The last semi-annual report described the process of FE model validation and correlation with experimental data in terms of dynamic performance and predicted stresses. It also detailed efforts into making the supporting structure less important to system performance. Finally, an introduction into the dry application concept was presented. Since then, the design refinement phase was completed. This has resulted in a Smart Screen design that meets performance targets both in the dry condition and with taconite slurry flow using PZT motors. Furthermore, this system was successfully demonstrated for the DOE and partner companies at the Coleraine Mineral Research Laboratory in Coleraine, Minnesota.« less

  20. Modeling a maintenance simulation of the geosynchronous platform

    NASA Technical Reports Server (NTRS)

    Kleiner, A. F., Jr.

    1980-01-01

    A modeling technique used to conduct a simulation study comparing various maintenance routines for a space platform is dicussed. A system model is described and illustrated, the basic concepts of a simulation pass are detailed, and sections on failures and maintenance are included. The operation of the system across time is best modeled by a discrete event approach with two basic events - failure and maintenance of the system. Each overall simulation run consists of introducing a particular model of the physical system, together with a maintenance policy, demand function, and mission lifetime. The system is then run through many passes, each pass corresponding to one mission and the model is re-initialized before each pass. Statistics are compiled at the end of each pass and after the last pass a report is printed. Items of interest typically include the time to first maintenance, total number of maintenance trips for each pass, average capability of the system, etc.

  1. Guide for preparing active solar heating systems operation and maintenance manuals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-01-01

    This book presents a systematic and standardized approach to the preparation of operation and maintenance manuals for active solar heating systems. Provides an industry consensus of the best operating and maintenance procedures for large commercial-scale solar service water and space heating systems. A sample O M manual is included. 3-ring binder included.

  2. A Comparison of the Preferred Teaching Styles of Oklahoma Aviation Maintenance Instructors and Flight Instructors

    ERIC Educational Resources Information Center

    King, Deann Marie

    2013-01-01

    The purpose of this study was to compare the preferred teaching styles of Oklahoma aviation maintenance instructors and flight instructors. The scope of this study included maintenance instructors in CareerTech schools (Part 147 programs) and ground/flight instructors in Part 141 flight schools in Oklahoma. The methodology included administering…

  3. A Fuzzy analytical hierarchy process approach in irrigation networks maintenance

    NASA Astrophysics Data System (ADS)

    Riza Permana, Angga; Rintis Hadiani, Rr.; Syafi'i

    2017-11-01

    Ponorogo Regency has 440 Irrigation Area with a total area of 17,950 Ha. Due to the limited budget and lack of maintenance cause decreased function on the irrigation. The aim of this study is to make an appropriate system to determine the indices weighted of the rank prioritization criteria for irrigation network maintenance using a fuzzy-based methodology. The criteria that are used such as the physical condition of irrigation networks, area of service, estimated maintenance cost, and efficiency of irrigation water distribution. 26 experts in the field of water resources in the Dinas Pekerjaan Umum were asked to fill out the questionnaire, and the result will be used as a benchmark to determine the rank of irrigation network maintenance priority. The results demonstrate that the physical condition of irrigation networks criterion (W1) = 0,279 has the greatest impact on the assessment process. The area of service (W2) = 0,270, efficiency of irrigation water distribution (W4) = 0,249, and estimated maintenance cost (W3) = 0,202 criteria rank next in effectiveness, respectively. The proposed methodology deals with uncertainty and vague data using triangular fuzzy numbers, and, moreover, it provides a comprehensive decision-making technique to assess maintenance priority on irrigation network.

  4. Extraterrestrial processing and manufacturing of large space systems, volume 2, chapters 7-14 and appendices

    NASA Technical Reports Server (NTRS)

    Miller, R. H.; Smith, D. B. S.

    1979-01-01

    Production and support equipment specifications are described for the space manufacturing facility (SMF). Defined production equipment includes electromagnetic pumps for liquid metal, metal alloying furnaces, die casters, electron beam welders and cutters, glass forming for structural elements, and rolling. A cost analysis is presented which includes the development, the aquisition of all SMF elements, initial operating cost, maintenance and logistics cost, cost of terrestrial materials, and transportation cost for each major element. Computer program listings and outputs are appended.

  5. KSC-08pd3583

    NASA Image and Video Library

    2008-10-15

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the NASA Railroad Maintenance Crew and Railroad and Transportation Management Team pose alongside NASA Railroad locomotive 3. From left, in front are Rick Koury, Chris Bryant and Tony Andrade. Behind, from left, are Will Eriksen, Mike Stephens, Kurt Bush, Gary Steele, John Muzzy, Mike Fitch, Chuck Sturgill and Jesse Crews. The maintenance team completed the refurbishment of locomotive 3 in October. The 15-month process, including a new paint scheme, dealt with extensive corrosion to the locomotive because of Kennedy's proximity to the Atlantic Ocean. Locomotives 1 and 2 also will be refurbished eventually. The NASA Railroad locomotives are SW-1500 switch engines built by Electro Motive Diesel (EMD). Photo credit: NASA/Amanda Diller

  6. 47 CFR 54.301 - Local switching support.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Deferred Maintenance and Retirements Included in Account 1438 Deferred Charges Included in Account 1438... 4300); and Deferred Maintenance and Retirements (Included in Account 1438) shall be allocated according... Amortization Included in Accounts 2005, 2680, 2690, 3410 Net Deferred Operating Income Taxes Accounts 4100...

  7. How verbal and spatial manipulation networks contribute to calculation: an fMRI study.

    PubMed

    Zago, Laure; Petit, Laurent; Turbelin, Marie-Renée; Andersson, Frédéric; Vigneau, Mathieu; Tzourio-Mazoyer, Nathalie

    2008-01-01

    The manipulation of numbers required during calculation is known to rely on working memory (WM) resources. Here, we investigated the respective contributions of verbal and/or spatial WM manipulation brain networks during the addition of four numbers performed by adults, using functional magnetic resonance imaging (fMRI). Both manipulation and maintenance tasks were proposed with syllables, locations, or two-digit numbers. As compared to their maintenance, numbers manipulation (addition) elicited increased activation within a widespread cortical network including inferior temporal, parietal, and prefrontal regions. Our results demonstrate that mastery of arithmetic calculation requires the cooperation of three WM manipulation systems: an executive manipulation system conjointly recruited by the three manipulation tasks, including the anterior cingulate cortex (ACC), the orbital part of the inferior frontal gyrus, and the caudate nuclei; a left-lateralized, language-related, inferior fronto-temporal system elicited by numbers and syllables manipulation tasks required for retrieval, selection, and association of symbolic information; and a right superior and posterior fronto-parietal system elicited by numbers and locations manipulation tasks for spatial WM and attentional processes. Our results provide new information that the anterior intraparietal sulcus (IPS) is involved in tasks requiring a magnitude processing with symbolic (numbers) and nonsymbolic (locations) stimuli. Furthermore, the specificity of arithmetic processing is mediated by a left-hemispheric specialization of the anterior and posterior parts of the IPS as compared to a spatial task involving magnitude processing with nonsymbolic material.

  8. Management Tools for Bus Maintenance: Current Practices and New Methods. Final Report.

    ERIC Educational Resources Information Center

    Foerster, James; And Others

    Management of bus fleet maintenance requires systematic recordkeeping, management reporting, and work scheduling procedures. Tools for controlling and monitoring routine maintenance activities are in common use. These include defect and fluid consumption reports, work order systems, historical maintenance records, and performance and cost…

  9. 49 CFR 214.341 - Roadway maintenance machines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Roadway maintenance machines. 214.341 Section 214... Roadway maintenance machines. (a) Each employer shall include in its on-track safety program specific provisions for the safety of roadway workers who operate or work near roadway maintenance machines. Those...

  10. Theoretical explanations for maintenance of behaviour change: a systematic review of behaviour theories.

    PubMed

    Kwasnicka, Dominika; Dombrowski, Stephan U; White, Martin; Sniehotta, Falko

    2016-09-01

    Behaviour change interventions are effective in supporting individuals in achieving temporary behaviour change. Behaviour change maintenance, however, is rarely attained. The aim of this review was to identify and synthesise current theoretical explanations for behaviour change maintenance to inform future research and practice. Potentially relevant theories were identified through systematic searches of electronic databases (Ovid MEDLINE, Embase, PsycINFO). In addition, an existing database of 80 theories was searched, and 25 theory experts were consulted. Theories were included if they formulated hypotheses about behaviour change maintenance. Included theories were synthesised thematically to ascertain overarching explanations for behaviour change maintenance. Initial theoretical themes were cross-validated. One hundred and seventeen behaviour theories were identified, of which 100 met the inclusion criteria. Five overarching, interconnected themes representing theoretical explanations for behaviour change maintenance emerged. Theoretical explanations of behaviour change maintenance focus on the differential nature and role of motives, self-regulation, resources (psychological and physical), habits, and environmental and social influences from initiation to maintenance. There are distinct patterns of theoretical explanations for behaviour change and for behaviour change maintenance. The findings from this review can guide the development and evaluation of interventions promoting maintenance of health behaviours and help in the development of an integrated theory of behaviour change maintenance.

  11. Theoretical explanations for maintenance of behaviour change: a systematic review of behaviour theories

    PubMed Central

    Kwasnicka, Dominika; Dombrowski, Stephan U; White, Martin; Sniehotta, Falko

    2016-01-01

    ABSTRACT Background: Behaviour change interventions are effective in supporting individuals in achieving temporary behaviour change. Behaviour change maintenance, however, is rarely attained. The aim of this review was to identify and synthesise current theoretical explanations for behaviour change maintenance to inform future research and practice. Methods: Potentially relevant theories were identified through systematic searches of electronic databases (Ovid MEDLINE, Embase, PsycINFO). In addition, an existing database of 80 theories was searched, and 25 theory experts were consulted. Theories were included if they formulated hypotheses about behaviour change maintenance. Included theories were synthesised thematically to ascertain overarching explanations for behaviour change maintenance. Initial theoretical themes were cross-validated. Findings: One hundred and seventeen behaviour theories were identified, of which 100 met the inclusion criteria. Five overarching, interconnected themes representing theoretical explanations for behaviour change maintenance emerged. Theoretical explanations of behaviour change maintenance focus on the differential nature and role of motives, self-regulation, resources (psychological and physical), habits, and environmental and social influences from initiation to maintenance. Discussion: There are distinct patterns of theoretical explanations for behaviour change and for behaviour change maintenance. The findings from this review can guide the development and evaluation of interventions promoting maintenance of health behaviours and help in the development of an integrated theory of behaviour change maintenance. PMID:26854092

  12. The Evaluation of Screening Process and Local Bureaucracy in Determining the Priority of Urban Roads Maintenance and Rehabilitation

    NASA Astrophysics Data System (ADS)

    Hendhratmoyo, Andri; Syafi'i; Pungky Pramesti, Florentina

    2017-11-01

    Due to the limited budget of urban roads maintenance and rehabilitation, its prioritizationis inevitable. Many models have been developed to solve these problems. That is the reason why the purpose of this study was to evaluate the screening process in the decision making of the urban roads maintenance and rehabilitation priority. The prioritization that have to be taken into account on the effect of important criteria are road condition, traffic volume, budget processing and land use. 30 stakeholders were asked to fill in the questionnaires. The object of this case study are 188 urban roads sections at Ponorogo in order to examine the priorities. The researchers collected the data from Surface Distress Index (SDI), traffic volume, budget processing and land use of these road sections. Based on analysis, the weights of the criteria were: road condition (W1) = 0,411; traffic volume (W2) = 0,122; budget processing (W3) = 0,363 and land use (W4) = 0,105. The result of this study by the comparison of the index values of the alternatives priorities, Nyi Ageng Serang Street, was revealed to have the highest priority over the other streets regarding of maintenance and rehabilitation activities.

  13. Two fuzzy possibilistic bi-objective zero-one programming models for outsourcing the equipment maintenance problem

    NASA Astrophysics Data System (ADS)

    Vahdani, Behnam; Jolai, Fariborz; Tavakkoli-Moghaddam, Reza; Meysam Mousavi, S.

    2012-07-01

    Maintenance outsourcing can be regarded as a strategic weapon to increase productivity and customer satisfaction in many companies, and this critical activity can be performed in a more efficient and effective way. This article presents two novel fuzzy possibilistic bi-objective zero-one programming (FPBOZOP) models for outsourcing of the equipment maintenance. In these models, cost parameters, including outsourcing cost, risk cost, time operations for performing the equipment maintenance and reliability level, as well as other influential parameters are considered through the outsourcing process. Moreover, the presented models can measure the capability of the company in doing different activities, unlike previous studies, in order to see the possibility of maintenance in-house, and can lead to make a best decision on the basis of the models' results. Both models are developed under uncertainty, which bring top managers the possibility of assigning more than one equipment or project to the supplier so that the profit is maximized, and the cost is minimized by considering bi-objectives concurrently. Then, a new fuzzy mathematical programming based possibilistic approach is introduced as a solution methodology from the recent literature to solve the proposed bi-objective zero-one programming (BOZOP) models and to reach a preferred compromise solution. Furthermore, a real-case study is utilized to demonstrate and to validate the effectiveness of the presented models. The computational results revealed that the models can be implemented in variety of problems in the domain of the equipment maintenance outsourcing and project outsourcing either from theory or application perspectives.

  14. Views of policy makers and health promotion professionals on factors facilitating implementation and maintenance of interventions and policies promoting physical activity and healthy eating: results of the DEDIPAC project.

    PubMed

    Muellmann, Saskia; Steenbock, Berit; De Cocker, Katrien; De Craemer, Marieke; Hayes, Catherine; O'Shea, Miriam P; Horodyska, Karolina; Bell, Justyna; Luszczynska, Aleksandra; Roos, Gun; Langøien, Lars Jørun; Rugseth, Gro; Terragni, Laura; De Bourdeaudhuij, Ilse; Brug, Johannes; Pischke, Claudia R

    2017-12-06

    The uptake, implementation, and maintenance of effective interventions promoting physical activity (PA) and a healthy diet and the implementation of policies targeting these behaviors are processes not well understood. We aimed to gain a better understanding of what health promotion professionals and policy makers think are important factors facilitating adoption, implementation, and maintenance of multi-level interventions and policies promoting healthy eating and PA in Belgium, Germany, Ireland, Norway, and Poland. Six interventions and six policies were identified based on pre-defined criteria. Forty semi-structured interviews were conducted with stakeholders from various sectors to elicit information on factors impacting adoption, implementation, and maintenance of these interventions and policies. All interview transcripts were coded in NVivo, using a common categorization matrix. Coding in the respective countries was done by one researcher and validated by a second researcher. Active involvement of relevant stakeholders and good communication between coordinating organizations were described as important factors contributing to successful adoption and implementation of both interventions and policies. Additional facilitating factors included sufficient training of staff and tailoring of materials to match needs of various target groups. The respondents indicated that maintenance of implemented interventions/policies depended on whether they were embedded in existing or newly created organizational structures in different settings and whether continued funding was secured. Despite considerable heterogeneity of interventions and health policies in the five countries, stakeholders across these countries identify similar factors facilitating adoption, implementation, and maintenance of these interventions and policies.

  15. The Effects of Beacons, Comments, and Tasks on Program Comprehension Process in Software Maintenance

    ERIC Educational Resources Information Center

    Fan, Quyin

    2010-01-01

    Program comprehension is the most important and frequent process in software maintenance. Extensive research has found that individual characteristics of programmers, differences of computer programs, and differences of task-driven motivations are the major factors that affect the program comprehension results. There is no study specifically…

  16. 76 FR 7102 - Simplified Network Application Processing System, On-line Registration and Account Maintenance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-09

    ... DEPARTMENT OF COMMERCE Bureau of Industry and Security 15 CFR Part 748 [Docket No. 100826397-1059-02] RIN 0694-AE98 Simplified Network Application Processing System, On-line Registration and Account Maintenance AGENCY: Bureau of Industry and Security, Commerce. ACTION: Final rule. SUMMARY: The Bureau of...

  17. Multirate state and parameter estimation in an antibiotic fermentation with delayed measurements.

    PubMed

    Gudi, R D; Shah, S L; Gray, M R

    1994-12-01

    This article discusses issues related to estimation and monitoring of fermentation processes that exhibit endogenous metabolism and time-varying maintenance activity. Such culture-related activities hamper the use of traditional, software sensor-based algorithms, such as the extended kalman filter (EKF). In the approach presented here, the individual effects of the endogenous decay and the true maintenance processes have been lumped to represent a modified maintenance coefficient, m(c). Model equations that relate measurable process outputs, such as the carbon dioxide evolution rate (CER) and biomass, to the observable process parameters (such as net specific growth rate and the modified maintenance coefficient) are proposed. These model equations are used in an estimator that can formally accommodate delayed, infrequent measurements of the culture states (such as the biomass) as well as frequent, culture-related secondary measurements (such as the CER). The resulting multirate software sensor-based estimation strategy is used to monitor biomass profiles as well as profiles of critical fermentation parameters, such as the specific growth for a fed-batch fermentation of Streptomyces clavuligerus.

  18. 40 CFR 90.1204 - Maintenance, aging and testing of engines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Maintenance, aging and testing of... Voluntary In-Use Testing § 90.1204 Maintenance, aging and testing of engines. (a) Prior to aging the engines... assure that the engines and equipment were properly used and maintained during the field aging process...

  19. 40 CFR 90.1204 - Maintenance, aging and testing of engines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Maintenance, aging and testing of... Voluntary In-Use Testing § 90.1204 Maintenance, aging and testing of engines. (a) Prior to aging the engines... assure that the engines and equipment were properly used and maintained during the field aging process...

  20. 40 CFR 90.1204 - Maintenance, aging and testing of engines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Maintenance, aging and testing of... Voluntary In-Use Testing § 90.1204 Maintenance, aging and testing of engines. (a) Prior to aging the engines... assure that the engines and equipment were properly used and maintained during the field aging process...

  1. 40 CFR 90.1204 - Maintenance, aging and testing of engines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Maintenance, aging and testing of... Voluntary In-Use Testing § 90.1204 Maintenance, aging and testing of engines. (a) Prior to aging the engines... assure that the engines and equipment were properly used and maintained during the field aging process...

  2. 40 CFR 90.1204 - Maintenance, aging and testing of engines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Maintenance, aging and testing of... Voluntary In-Use Testing § 90.1204 Maintenance, aging and testing of engines. (a) Prior to aging the engines... assure that the engines and equipment were properly used and maintained during the field aging process...

  3. 40 CFR 63.2251 - What are the requirements for the routine control device maintenance exemption?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the routine control device maintenance exemption? (a) You may request a routine control device..., explain why the maintenance cannot be accomplished during process shutdowns, describe how you plan to make... device is used to control a green rotary dryer, tube dryer, rotary strand dryer, or pressurized refiner...

  4. A Capacity Forecast Model for Volatile Data in Maintenance Logistics

    NASA Astrophysics Data System (ADS)

    Berkholz, Daniel

    2009-05-01

    Maintenance, repair and overhaul processes (MRO processes) are elaborate and complex. Rising demands on these after sales services require reliable production planning and control methods particularly for maintaining valuable capital goods. Downtimes lead to high costs and an inability to meet delivery due dates results in severe contract penalties. Predicting the required capacities for maintenance orders in advance is often difficult due to unknown part conditions unless the goods are actually inspected. This planning uncertainty results in extensive capital tie-up by rising stock levels within the whole MRO network. The article outlines an approach to planning capacities when maintenance data forecasting is volatile. It focuses on the development of prerequisites for a reliable capacity planning model. This enables a quick response to maintenance orders by employing appropriate measures. The information gained through the model is then systematically applied to forecast both personnel capacities and the demand for spare parts. The improved planning reliability can support MRO service providers in shortening delivery times and reducing stock levels in order to enhance the performance of their maintenance logistics.

  5. The 50 Most Important Questions Relating to the Maintenance and Restoration of an Ecological Continuum in the European Alps

    PubMed Central

    Walzer, Chris; Kowalczyk, Christine; Alexander, Jake M.; Baur, Bruno; Bogliani, Giuseppe; Brun, Jean-Jacques; Füreder, Leopold; Guth, Marie-Odile; Haller, Ruedi; Holderegger, Rolf; Kohler, Yann; Kueffer, Christoph; Righetti, Antonio; Spaar, Reto; Sutherland, William J.; Ullrich-Schneider, Aurelia; Vanpeene-Bruhier, Sylvie N.; Scheurer, Thomas

    2013-01-01

    The European Alps harbour a unique and species-rich biodiversity, which is increasingly impacted by habitat fragmentation through land-use changes, urbanization and expanding transport infrastructure. In this study, we identified the 50 most important questions relating to the maintenance and restoration of an ecological continuum – the connectedness of ecological processes across many scales including trophic relationship and disturbance processes and hydro-ecological flows in the European Alps. We initiated and implemented a trans-national priority setting exercise, inviting 48 institutions including researchers, conservation practitioners, NGOs, policymakers and administrators from the Alpine region. The exercise was composed of an initial call for pertinent questions, a first online evaluation of the received questions and a final discussion and selection process during a joint workshop. The participating institutions generated 484 initial questions, which were condensed to the 50 most important questions by 16 workshop participants. We suggest new approaches in tackling the issue of an ecological continuum in the Alps by analysing and classifying the characteristics of the resulting questions in a non-prioritized form as well as in a visual conceptualisation of the inter-dependencies among these questions. This priority setting exercise will support research and funding institutions in channelling their capacities and resources towards questions that need to be urgently addressed in order to facilitate significant progress in biodiversity conservation in the European Alps. PMID:23341928

  6. 20. SITE BUILDING 002 SCANNER BUILDING IN COMPUTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. SITE BUILDING 002 - SCANNER BUILDING - IN COMPUTER ROOM LOOKING AT "CONSOLIDATED MAINTENANCE OPERATIONS CENTER" JOB AREA AND OPERATION WORK CENTER. TASKS INCLUDE RADAR MAINTENANCE, COMPUTER MAINTENANCE, CYBER COMPUTER MAINTENANCE AND RELATED ACTIVITIES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  7. Asphalt in Pavement Maintenance.

    ERIC Educational Resources Information Center

    Asphalt Inst., College Park, MD.

    Maintenance methods that can be used equally well in all regions of the country have been developed for the use of asphalt in pavement maintenance. Specific information covering methods, equipment and terminology that applies to the use of asphalt in the maintenance of all types of pavement structures, including shoulders, is provided. In many…

  8. Ground Vehicle Condition Based Maintenance

    DTIC Science & Technology

    2010-10-04

    Diagnostic Process Map 32 FMEAs Developed : • Diesel Engine • Transmission • Alternators Analysis : • Identify failure modes • Derive design factors and...S&T Initiatives  TARDEC P&D Process Map  Component Testing  ARL CBM Research  AMSAA SDC & Terrain Modeling UNCLASSIFIED 3 CBM+ Overview...UNCLASSIFIED 4 RCM and CBM are core processes for CBM+ System Development • Army Regulation 750-1, 20 Sep 2007, p. 79 - Reliability Centered Maintenance (RCM

  9. 75 FR 9816 - Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model ERJ 170 and ERJ...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... maintenance plan to include repetitive functional tests of the low-stage check valve. For certain other... program to include maintenance Task Number 36-11-02- 002 (Low Stage Bleed Check Valve), specified in... Check Valve) in Section 1 of the EMBRAER 170 Maintenance Review Board Report MRB-1621. Issued in Renton...

  10. Working memory maintenance is sufficient to reduce state anxiety.

    PubMed

    Balderston, Nicholas L; Quispe-Escudero, David; Hale, Elizabeth; Davis, Andrew; O'Connell, Katherine; Ernst, Monique; Grillon, Christian

    2016-11-01

    According to the attentional control theory (ACT) proposed by Eysenck and colleagues, anxiety interferes with cognitive processing by prioritizing bottom-up attentional processes over top-down attentional processes, leading to competition for access to limited resources in working memory, particularly the central executive (Eysenck, Derakshan, Santos, & Calvo, ). However, previous research using the n-back working memory task suggests that working memory load also reduces state anxiety. Assuming that similar mechanisms underlie the effect of anxiety on cognition, and the effect of cognition on anxiety, one possible implication of the ACT would suggest that the reduction of state anxiety with increasing working memory load is driven by activation of central executive attentional control processes. We tested this hypothesis using the Sternberg working memory paradigm, where maintenance processes can be isolated from central executive processes (Altamura et al., ; Sternberg, ). Consistent with the n-back results, subjects showed decreased state anxiety during the maintenance period of high-load trials relative to low-load trials, suggesting that maintenance processes alone are sufficient to achieve this state anxiety reduction. Given that the Sternberg task does not require central executive engagement, these results are not consistent with an implication of the ACT where the cognition/anxiety relationship and anxiety/cognition relationship are mediated by similar central executive mechanisms. Instead, we propose an extension of the ACT such that engaging working memory maintenance suppresses state anxiety in a load-dependent manner. Furthermore, we hypothesize that the efficacy of this effect may moderate the effect of trait anxiety on cognition. Published 2016. This article is a U.S. Government work and is in the public domain in the USA.

  11. Characterizing and Assessing a Large-Scale Software Maintenance Organization

    NASA Technical Reports Server (NTRS)

    Briand, Lionel; Melo, Walcelio; Seaman, Carolyn; Basili, Victor

    1995-01-01

    One important component of a software process is the organizational context in which the process is enacted. This component is often missing or incomplete in current process modeling approaches. One technique for modeling this perspective is the Actor-Dependency (AD) Model. This paper reports on a case study which used this approach to analyze and assess a large software maintenance organization. Our goal was to identify the approach's strengths and weaknesses while providing practical recommendations for improvement and research directions. The AD model was found to be very useful in capturing the important properties of the organizational context of the maintenance process, and aided in the understanding of the flaws found in this process. However, a number of opportunities for extending and improving the AD model were identified. Among others, there is a need to incorporate quantitative information to complement the qualitative model.

  12. Basing assessment and treatment of problem behavior on behavioral momentum theory: Analyses of behavioral persistence.

    PubMed

    Schieltz, Kelly M; Wacker, David P; Ringdahl, Joel E; Berg, Wendy K

    2017-08-01

    The connection, or bridge, between applied and basic behavior analysis has been long-established (Hake, 1982; Mace & Critchfield, 2010). In this article, we describe how clinical decisions can be based more directly on behavioral processes and how basing clinical procedures on behavioral processes can lead to improved clinical outcomes. As a case in point, we describe how applied behavior analyses of maintenance, and specifically the long-term maintenance of treatment effects related to problem behavior, can be adjusted and potentially enhanced by basing treatment on Behavioral Momentum Theory. We provide a brief review of the literature including descriptions of two translational studies that proposed changes in how differential reinforcement of alternative behavior treatments are conducted based on Behavioral Momentum Theory. We then describe current clinical examples of how these translations are continuing to impact the definitions, designs, analyses, and treatment procedures used in our clinical practice. Copyright © 2017 Elsevier B.V. All rights reserved.

  13. Computer Assisted Multi-Center Creation of Medical Knowledge Bases

    PubMed Central

    Giuse, Nunzia Bettinsoli; Giuse, Dario A.; Miller, Randolph A.

    1988-01-01

    Computer programs which support different aspects of medical care have been developed in recent years. Their capabilities range from diagnosis to medical imaging, and include hospital management systems and therapy prescription. In spite of their diversity these systems have one commonality: their reliance on a large body of medical knowledge in computer-readable form. This knowledge enables such programs to draw inferences, validate hypotheses, and in general to perform their intended task. As has been clear to developers of such systems, however, the creation and maintenance of medical knowledge bases are very expensive. Practical and economical difficulties encountered during this long-term process have discouraged most attempts. This paper discusses knowledge base creation and maintenance, with special emphasis on medical applications. We first describe the methods currently used and their limitations. We then present our recent work on developing tools and methodologies which will assist in the process of creating a medical knowledge base. We focus, in particular, on the possibility of multi-center creation of the knowledge base.

  14. Reusable Rocket Engine Operability Modeling and Analysis

    NASA Technical Reports Server (NTRS)

    Christenson, R. L.; Komar, D. R.

    1998-01-01

    This paper describes the methodology, model, input data, and analysis results of a reusable launch vehicle engine operability study conducted with the goal of supporting design from an operations perspective. Paralleling performance analyses in schedule and method, this requires the use of metrics in a validated operations model useful for design, sensitivity, and trade studies. Operations analysis in this view is one of several design functions. An operations concept was developed given an engine concept and the predicted operations and maintenance processes incorporated into simulation models. Historical operations data at a level of detail suitable to model objectives were collected, analyzed, and formatted for use with the models, the simulations were run, and results collected and presented. The input data used included scheduled and unscheduled timeline and resource information collected into a Space Transportation System (STS) Space Shuttle Main Engine (SSME) historical launch operations database. Results reflect upon the importance not only of reliable hardware but upon operations and corrective maintenance process improvements.

  15. Assessing cognitive processes related to insomnia: A review and measurement guide for Harvey's cognitive model for the maintenance of insomnia.

    PubMed

    Hiller, Rachel M; Johnston, Anna; Dohnt, Hayley; Lovato, Nicole; Gradisar, Michael

    2015-10-01

    Cognitive processes play an important role in the maintenance, and treatment of sleep difficulties, including insomnia. In 2002, a comprehensive model was proposed by Harvey. Since its inception the model has received >300 citations, and provided researchers and clinicians with a framework for understanding and treating insomnia. The aim of this review is two-fold. First, we review the current literature investigating each factor proposed in Harvey's cognitive model of insomnia. Second, we summarise the psychometric properties of key measures used to assess the model's factors and mechanisms. From these aims, we demonstrate both strengths and limitations of the current knowledge of appropriate measurements associated with the model. This review aims to stimulate and guide future research in this area; and provide an understanding of the resources available to measure, target, and resolve cognitive factors that may maintain chronic insomnia. Copyright © 2014 Elsevier Ltd. All rights reserved.

  16. Interactions between parasites and microbial communities in the human gut.

    PubMed

    Berrilli, Federica; Di Cave, David; Cavallero, Serena; D'Amelio, Stefano

    2012-01-01

    The interactions between intestinal microbiota, immune system, and pathogens describe the human gut as a complex ecosystem, where all components play a relevant role in modulating each other and in the maintenance of homeostasis. The balance among the gut microbiota and the human body appear to be crucial for health maintenance. Intestinal parasites, both protozoans and helminths, interact with the microbial community modifying the balance between host and commensal microbiota. On the other hand, gut microbiota represents a relevant factor that may strongly interfere with the pathophysiology of the infections. In addition to the function that gut commensal microbiota may have in the processes that determine the survival and the outcome of many parasitic infections, including the production of nutritive macromolecules, also probiotics can play an important role in reducing the pathogenicity of many parasites. On these bases, there is a growing interest in explaining the rationale on the possible interactions between the microbiota, immune response, inflammatory processes, and intestinal parasites.

  17. Interactions between parasites and microbial communities in the human gut

    PubMed Central

    Berrilli, Federica; Di Cave, David; Cavallero, Serena; D'Amelio, Stefano

    2012-01-01

    The interactions between intestinal microbiota, immune system, and pathogens describe the human gut as a complex ecosystem, where all components play a relevant role in modulating each other and in the maintenance of homeostasis. The balance among the gut microbiota and the human body appear to be crucial for health maintenance. Intestinal parasites, both protozoans and helminths, interact with the microbial community modifying the balance between host and commensal microbiota. On the other hand, gut microbiota represents a relevant factor that may strongly interfere with the pathophysiology of the infections. In addition to the function that gut commensal microbiota may have in the processes that determine the survival and the outcome of many parasitic infections, including the production of nutritive macromolecules, also probiotics can play an important role in reducing the pathogenicity of many parasites. On these bases, there is a growing interest in explaining the rationale on the possible interactions between the microbiota, immune response, inflammatory processes, and intestinal parasites. PMID:23162802

  18. Developing a comprehensive training curriculum for integrated predictive maintenance

    NASA Astrophysics Data System (ADS)

    Wurzbach, Richard N.

    2002-03-01

    On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of key technologies such as vibration analysis, infrared thermography, and oil analysis not as singular entities, but as a toolbox resource from which to address overall equipment and plant reliability in a structured program and decision environment.

  19. A B-52H, tail number 61-0025, arrives at NASA's Dryden Flight Research Center after landing July 30,

    NASA Technical Reports Server (NTRS)

    2001-01-01

    NASA Dryden Flight Research Center, Edwards, California, received an 'H' model B-52 Stratofortress aircraft on July 30, 2001. The B-52H will be used as an air-launch aircraft supporting NASA's flight research and advanced technology demonstration efforts. Dryden received the B-52H from the U.S. Air Force's (USAF) 23rd Bomb Squadron, 5th Bombardment Wing (Air Combat Command), located at Minot AFB, N.D. A USAF crew flew the aircraft to Dryden. The aircraft, USAF tail number 61-0025, will be loaned initially, then later transferred from the USAF to NASA. The B-52H is scheduled to leave Dryden Aug. 2 for de-militarization and Programmed Depot Maintenance (PDM) at Tinker Air Force Base (AFB), Oklahoma. The depot-level maintenance is scheduled to last about six months and includes a thorough maintenance and inspection process. The newly arrived B-52H is slated to replace Dryden's famous B-52B '008,' in the 2003-2004 timeframe. It will take about one year for the B-52H to be ready for flight research duties. This time includes PDM, construction of the new pylon, installation of the flight research instrumentation equipment, and aircraft envelope clearance flights.

  20. Mutational landscape of yeast mutator strains.

    PubMed

    Serero, Alexandre; Jubin, Claire; Loeillet, Sophie; Legoix-Né, Patricia; Nicolas, Alain G

    2014-02-04

    The acquisition of mutations is relevant to every aspect of genetics, including cancer and evolution of species on Darwinian selection. Genome variations arise from rare stochastic imperfections of cellular metabolism and deficiencies in maintenance genes. Here, we established the genome-wide spectrum of mutations that accumulate in a WT and in nine Saccharomyces cerevisiae mutator strains deficient for distinct genome maintenance processes: pol32Δ and rad27Δ (replication), msh2Δ (mismatch repair), tsa1Δ (oxidative stress), mre11Δ (recombination), mec1Δ tel1Δ (DNA damage/S-phase checkpoints), pif1Δ (maintenance of mitochondrial genome and telomere length), cac1Δ cac3Δ (nucleosome deposition), and clb5Δ (cell cycle progression). This study reveals the diversity, complexity, and ultimate unique nature of each mutational spectrum, composed of punctual mutations, chromosomal structural variations, and/or aneuploidies. The mutations produced in clb5Δ/CCNB1, mec1Δ/ATR, tel1Δ/ATM, and rad27Δ/FEN1 strains extensively reshape the genome, following a trajectory dependent on previous events. It comprises the transmission of unstable genomes that lead to colony mosaicisms. This comprehensive analytical approach of mutator defects provides a model to understand how genome variations might accumulate during clonal evolution of somatic cell populations, including tumor cells.

  1. A B-52H, on loan to NASA's Dryden Flight Research Center, makes a pass down the runway prior to land

    NASA Technical Reports Server (NTRS)

    2001-01-01

    NASA Dryden Flight Research Center, Edwards, California, received an 'H' model B-52 Stratofortress aircraft on July 30, 2001. The B-52H will be used as an air-launch aircraft supporting NASA's flight research and advanced technology demonstration efforts. Dryden received the B-52H from the U.S. Air Force's (USAF) 23rd Bomb Squadron, 5th Bombardment Wing (Air Combat Command), located at Minot AFB, N.D. A USAF crew flew the aircraft to Dryden. The aircraft, USAF tail number 61-0025, will be loaned initially, then later transferred from the USAF to NASA. The B-52H is scheduled to leave Dryden Aug. 2 for de-militarization and Programmed Depot Maintenance (PDM) at Tinker Air Force Base (AFB), Oklahoma. The depot-level maintenance is scheduled to last about six months and includes a thorough maintenance and inspection process. The newly arrived B-52H is slated to replace Dryden's famous B-52B '008,' in the 2003-2004 timeframe. It will take about one year for the B-52H to be ready for flight research duties. This time includes PDM, construction of the new pylon, installation of the flight research instrumentation equipment, and aircraft envelope clearance flights.

  2. Maintenance Chemotherapy for Advanced Non–Small-Cell Lung Cancer: New Life for an Old Idea

    PubMed Central

    Gerber, David E.; Schiller, Joan H.

    2013-01-01

    Although well established for the treatment of certain hematologic malignancies, maintenance therapy has only recently become a treatment paradigm for advanced non–small-cell lung cancer. Maintenance therapy, which is designed to prolong a clinically favorable state after completion of a predefined number of induction chemotherapy cycles, has two principal paradigms. Continuation maintenance therapy entails the ongoing administration of a component of the initial chemotherapy regimen, generally the nonplatinum cytotoxic drug or a molecular targeted agent. With switch maintenance (also known as sequential therapy), a new and potentially non–cross-resistant agent is introduced immediately on completion of first-line chemotherapy. Potential rationales for maintenance therapy include increased exposure to effective therapies, decreasing chemotherapy resistance, optimizing efficacy of chemotherapeutic agents, antiangiogenic effects, and altering antitumor immunity. To date, switch maintenance therapy strategies with pemetrexed and erlotinib have demonstrated improved overall survival, resulting in US Food and Drug Administration approval for this indication. Recently, continuation maintenance with pemetrexed was found to prolong overall survival as well. Factors predicting benefit from maintenance chemotherapy include the degree of response to first-line therapy, performance status, the likelihood of receiving further therapy at the time of progression, and tumor histology and molecular characteristics. Several aspects of maintenance therapy have raised considerable debate in the thoracic oncology community, including clinical trial end points, the prevalence of second-line chemotherapy administration, the role of treatment-free intervals, quality of life, economic considerations, and whether progression-free survival is a worthy therapeutic goal in this disease setting. PMID:23401441

  3. Operation and maintenance, fire rescue air-pack. Volume 2: Communications

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The operation and maintenance procedures are described for the development model of the fire rescue air pack (FRAP) voice amplifier assembly, including the battery charger. Operational instructions include a general description of the assembly, specifications, and installation and operation. Maintenance instructions include theory of operation, preventive maintenance, repair, adjustment, and a parts list. The FRAP is intended to permit fire rescue personnel to enter a smoke-filled, toxic or oxygen depleted environment carrying their own source of breathing air. The voice amplifier assembly permits the wearer to communicate by voice with other persons in the vicinity. The battery charger assembly provides a means of keeping the amplifier batteries fully charged.

  4. Reliability-centered maintenance for ground-based large optical telescopes and radio antenna arrays

    NASA Astrophysics Data System (ADS)

    Marchiori, G.; Formentin, F.; Rampini, F.

    2014-07-01

    In the last years, EIE GROUP has been more and more involved in large optical telescopes and radio antennas array projects. In this frame, the paper describes a fundamental aspect of the Logistic Support Analysis (LSA) process, that is the application of the Reliability-Centered Maintenance (RCM) methodology for the generation of maintenance plans for ground-based large optical telescopes and radio antennas arrays. This helps maintenance engineers to make sure that the telescopes continue to work properly, doing what their users require them to do in their present operating conditions. The main objective of the RCM process is to establish the complete maintenance regime, with the safe minimum required maintenance, carried out without any risk to personnel, telescope and subsystems. At the same time, a correct application of the RCM allows to increase the cost effectiveness, telescope uptime and items availability, and to provide greater understanding of the level of risk that the organization is managing. At the same time, engineers shall make a great effort since the initial phase of the project to obtain a telescope requiring easy maintenance activities and simple replacement of the major assemblies, taking special care on the accesses design and items location, implementation and design of special lifting equipment and handling devices for the heavy items. This maintenance engineering framework is based on seven points, which lead to the main steps of the RCM program. The initial steps of the RCM process consist of: system selection and data collection (MTBF, MTTR, etc.), definition of system boundaries and operating context, telescope description with the use of functional block diagrams, and the running of a FMECA to address the dominant causes of equipment failure and to lay down the Critical Items List. In the second part of the process the RCM logic is applied, which helps to determine the appropriate maintenance tasks for each identified failure mode. Once the logic is completed for all the analyzed items, the resulting Maintenance Program is compiled in order to preserve all the system important functions and to rationalize the tasks periodicities. Lastly, the RCM is kept alive throughout the entire life of the telescope, where the effectiveness of the maintenance is constantly reviewed and adjusted on the basis of the "lesson learned". In addition to the RCM analysis methodology, a second basic concept is applied for the telescope maintenance: to design and install components in such a manner to restore a failure and to perform servicing procedures as close as possible to the telescope, maximizing the replacement of Line Replaceable Units (LRUs) or Shop Replaceable Units (SRUs), rather than repair on-equipment.

  5. Optimisation of maintenance concept choice using risk-decision factor - a case study

    NASA Astrophysics Data System (ADS)

    Popovic, Vladimir M.; Vasic, Branko M.; Rakicevic, Branislav B.; Vorotovic, Goran S.

    2012-10-01

    The design of maintenance system and the corresponding logistic support is a very complex process, during which the aim is to find the compromise solutions regarding the relations among different maintenance procedures and the ways of their implementation. As a result of this, various solutions can be adopted, since this is conditioned by a series of important factors and criteria, which can be contradictory sometimes. There are different perspectives on ways of solving practical maintenance problems, that is dilemmas when it comes to the choice of maintenance concept. The principal dilemma is how and when to decide on carrying out maintenance procedures. Should the decision be based on theoretical grounds or experience, how does one reconcile those two extremes, who is to decide upon this? In this article we have offered one, basically new solution as a possibility for maintenance concept choice, based on a significant modification of the widely used failure modes and effects analysis (FMEA) method. This solution is risk-decision factor (RDF). This is a result of seven parameters (of different importance and weight) that have the key impact on the process of production and logistic support. The application of this factor is illustrated by the example of planning, organisation and functioning of the maintenance system applied in The Institute for Manufacturing Banknotes and Coins (ZIN) in Belgrade.

  6. Preventive maintenance study : interim report.

    DOT National Transportation Integrated Search

    2017-09-01

    This interim report details the performance of 69 test sites treated with various preventive maintenance treatments. The maintenance treatments applied included crack sealing, full lane chip sealing, wheel path chip sealing, dig outs (mill and fill),...

  7. Method and computer program product for maintenance and modernization backlogging

    DOEpatents

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  8. Quality assurance plan for Solar Maximum Mission (SSM) Instruments electronic assembly - HRUV spectrometer/polarimeter

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The quality assurance program demonstrates recognition of the quality aspects and an organized approach to achieve them. It ensures that quality requirements are determined and satisfied throughout all phases of contract performance, including preliminary and engineering design, development, fabrication, processing, assembly, inspection, test, checkout, packaging, shipping, storage, maintenance field use, flight preparations, flight operations and post-flight analysis, as applicable.

  9. Up and running. Choosing the right equipment service option.

    PubMed

    2011-08-01

    If you're trying to decide between servicing your equipment in-house or using an outside party, you know that finding the best option can be complicated. To help manage the decision process, this article includes a matrix to organize and assess all relevant factors. We also discuss equipment maintenance insurance, which allows you to cap your service costs for some or all of your equipment.

  10. Tropospheric Chemistry

    NASA Technical Reports Server (NTRS)

    Mohnen, V.

    1984-01-01

    The fundamental processes that control the chemical composition and cycles of the global troposphere and how these processes and properties affect the physical behavior of the atmosphere are examined. The long-term information needs for tropospheric chemistry are: to be able to predict tropospheric responses to perturbations, both natural and anthropogenic, of these cycles, and to provide the information required for the maintenance and effective future management of the atmospheric component of our global life support system. The processes controlling global tropospheric biogeochemical cycles include: the input of trace species into the troposphere, their long-range transport and distribution as affected by the mean wind and vertical venting, their chemical transformations, including gas to particle conversion, leading to the appearance of aerosols or aqueous phase reactions inside cloud droplets, and their removal from the troposphere via wet (precipitation) and dry deposition.

  11. Design and Implementation of an Interactive Website to Support Long-Term Maintenance of Weight Loss

    PubMed Central

    Stevens, Victor J; Brantley, Phillip J; Erlinger, Thomas P; Myers, Valerie H; Champagne, Catherine M; Bauck, Alan; Samuel-Hodge, Carmen D; Hollis, Jack F

    2008-01-01

    Background For most individuals, long-term maintenance of weight loss requires long-term, supportive intervention. Internet-based weight loss maintenance programs offer considerable potential for meeting this need. Careful design processes are required to maximize adherence and minimize attrition. Objective This paper describes the development, implementation and use of a Web-based intervention program designed to help those who have recently lost weight sustain their weight loss over 1 year. Methods The weight loss maintenance website was developed over a 1-year period by an interdisciplinary team of public health researchers, behavior change intervention experts, applications developers, and interface designers. Key interactive features of the final site include social support, self-monitoring, written guidelines for diet and physical activity, links to appropriate websites, supportive tools for behavior change, check-in accountability, tailored reinforcement messages, and problem solving and relapse prevention training. The weight loss maintenance program included a reminder system (automated email and telephone messages) that prompted participants to return to the website if they missed their check-in date. If there was no log-in response to the email and telephone automated prompts, a staff member called the participant. We tracked the proportion of participants with at least one log-in per month, and analyzed log-ins as a result of automated prompts. Results The mean age of the 348 participants enrolled in an ongoing randomized trial and assigned to use the website was 56 years; 63% were female, and 38% were African American. While weight loss data will not be available until mid-2008, website use remained high during the first year with over 80% of the participants still using the website during month 12. During the first 52 weeks, participants averaged 35 weeks with at least one log-in. Email and telephone prompts appear to be very effective at helping participants sustain ongoing website use. Conclusions Developing interactive websites is expensive, complex, and time consuming. We found that extensive paper prototyping well in advance of programming and a versatile product manager who could work with project staff at all levels of detail were essential to keeping the development process efficient. Trial Registration clinicaltrials.gov NCT00054925 PMID:18244892

  12. AN OPTIMAL MAINTENANCE MANAGEMENT MODEL FOR AIRPORT CONCRETE PAVEMENT

    NASA Astrophysics Data System (ADS)

    Shimomura, Taizo; Fujimori, Yuji; Kaito, Kiyoyuki; Obama, Kengo; Kobayashi, Kiyoshi

    In this paper, an optimal management model is formulated for the performance-based rehabilitation/maintenance contract for airport concrete pavement, whereby two types of life cycle cost risks, i.e., ground consolidation risk and concrete depreciation risk, are explicitly considered. The non-homogenous Markov chain model is formulated to represent the deterioration processes of concrete pavement which are conditional upon the ground consolidation processes. The optimal non-homogenous Markov decision model with multiple types of risk is presented to design the optimal rehabilitation/maintenance plans. And the methodology to revise the optimal rehabilitation/maintenance plans based upon the monitoring data by the Bayesian up-to-dating rules. The validity of the methodology presented in this paper is examined based upon the case studies carried out for the H airport.

  13. Latent human error analysis and efficient improvement strategies by fuzzy TOPSIS in aviation maintenance tasks.

    PubMed

    Chiu, Ming-Chuan; Hsieh, Min-Chih

    2016-05-01

    The purposes of this study were to develop a latent human error analysis process, to explore the factors of latent human error in aviation maintenance tasks, and to provide an efficient improvement strategy for addressing those errors. First, we used HFACS and RCA to define the error factors related to aviation maintenance tasks. Fuzzy TOPSIS with four criteria was applied to evaluate the error factors. Results show that 1) adverse physiological states, 2) physical/mental limitations, and 3) coordination, communication, and planning are the factors related to airline maintenance tasks that could be addressed easily and efficiently. This research establishes a new analytic process for investigating latent human error and provides a strategy for analyzing human error using fuzzy TOPSIS. Our analysis process complements shortages in existing methodologies by incorporating improvement efficiency, and it enhances the depth and broadness of human error analysis methodology. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  14. Biasing the brain's attentional set: I. cue driven deployments of intersensory selective attention.

    PubMed

    Foxe, John J; Simpson, Gregory V; Ahlfors, Seppo P; Saron, Clifford D

    2005-10-01

    Brain activity associated with directing attention to one of two possible sensory modalities was examined using high-density mapping of human event-related potentials. The deployment of selective attention was based on visually presented symbolic cue-words instructing subjects on a trial-by-trial basis, which sensory modality to attend. We measured the spatio-temporal pattern of activation in the approximately 1 second period between the cue-instruction and a subsequent compound auditory-visual imperative stimulus. This allowed us to assess the flow of processing across brain regions involved in deploying and sustaining inter-sensory selective attention, prior to the actual selective processing of the compound audio-visual target stimulus. Activity over frontal and parietal areas showed sensory specific increases in activation during the early part of the anticipatory period (~230 ms), probably representing the activation of fronto-parietal attentional deployment systems for top-down control of attention. In the later period preceding the arrival of the "to-be-attended" stimulus, sustained differential activity was seen over fronto-central regions and parieto-occipital regions, suggesting the maintenance of sensory-specific biased attentional states that would allow for subsequent selective processing. Although there was clear sensory biasing in this late sustained period, it was also clear that both sensory systems were being prepared during the cue-target period. These late sensory-specific biasing effects were also accompanied by sustained activations over frontal cortices that also showed both common and sensory specific activation patterns, suggesting that maintenance of the biased state includes top-down inputs from generators in frontal cortices, some of which are sensory-specific regions. These data support extensive interactions between sensory, parietal and frontal regions during processing of cue information, deployment of attention, and maintenance of the focus of attention in anticipation of impending attentionally relevant input.

  15. Electroflotation

    NASA Astrophysics Data System (ADS)

    Chen, Xueming; Chen, Guohua

    Electroflotation (EF) is the flotation using electrolytically generated bubbles of hydrogen and oxygen for separating suspended substances from aqueous phases. This process was first proposed by Elmore in 1905 for flotation of valuable minerals from ores. Compared with the conventional dissolved air flotation (DAF), EF has many advantages, including high flotation efficiency, compact units, easy operation, and less maintenance. Therefore, EF is an attractive alternative to DAF. This technique has been proven very effective in treating oily wastewater or oil-water emulsion, mining wastewater, groundwater, food processing wastewater, restaurant wastewater, industrial sewage, heavy metals containing effluent, and many other water and wastewaters.

  16. The role of NASA for aerospace information

    NASA Technical Reports Server (NTRS)

    Chandler, G. P., Jr.

    1980-01-01

    The NASA Scientific and Technical Information Program operations are performed by two contractor operated facilities. The NASA STI Facility, located near Baltimore, Maryland, employs about 210 people who process report literature, operate the computer complex, and provide support for software maintenance and developments. A second contractor, the Technical Information Services of the American Institute of Aeronautics and Astronautics, employs approximately 80 people in New York City and processes the open literature such as journals, magazines, and books. Features of these programs include online access via RECON, announcement services, and international document exchange.

  17. Manufacturing engineering: Principles for optimization

    NASA Astrophysics Data System (ADS)

    Koenig, Daniel T.

    Various subjects in the area of manufacturing engineering are addressed. The topics considered include: manufacturing engineering organization concepts and management techniques, factory capacity and loading techniques, capital equipment programs, machine tool and equipment selection and implementation, producibility engineering, methods, planning and work management, and process control engineering in job shops. Also discussed are: maintenance engineering, numerical control of machine tools, fundamentals of computer-aided design/computer-aided manufacture, computer-aided process planning and data collection, group technology basis for plant layout, environmental control and safety, and the Integrated Productivity Improvement Program.

  18. 76 FR 53348 - Airworthiness Directives; BAE SYSTEMS (Operations) Limited Model BAe 146 Airplanes and Model Avro...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    ... Maintenance Manual (AMM) includes chapters 05-10 ``Time Limits'', 05-15 ``Critical Design Configuration... 05, ``Time Limits/Maintenance Checks,'' of BAe 146 Series/AVRO 146-RJ Series Aircraft Maintenance... Chapter 05, ``Time Limits/ Maintenance Checks,'' of the BAE SYSTEMS (Operations) Limited BAe 146 Series...

  19. 49 CFR 214.355 - Training and qualification in on-track safety for operators of roadway maintenance machines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... operators of roadway maintenance machines. 214.355 Section 214.355 Transportation Other Regulations Relating... operators of roadway maintenance machines. (a) The training and qualification of roadway workers who operate roadway maintenance machines shall include, as a minimum: (1) Procedures to prevent a person from being...

  20. 49 CFR 214.355 - Training and qualification in on-track safety for operators of roadway maintenance machines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operators of roadway maintenance machines. 214.355 Section 214.355 Transportation Other Regulations Relating... operators of roadway maintenance machines. (a) The training and qualification of roadway workers who operate roadway maintenance machines shall include, as a minimum: (1) Procedures to prevent a person from being...

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Katipamula, Srinivas; Gowri, Krishnan; Hernandez, George

    This paper describes one such reference process that can be deployed to provide continuous automated conditioned-based maintenance management for buildings that have BIM, a building automation system (BAS) and a computerized maintenance management software (CMMS) systems. The process can be deployed using an open source transactional network platform, VOLTTRON™, designed for distributed sensing and controls and supports both energy efficiency and grid services.

  2. Burbank performs the WHC Yearly Maintenance in the Node 3

    NASA Image and Video Library

    2012-01-11

    ISS030-E-032750 (11 Jan. 2012) --- NASA astronaut Dan Burbank, Expedition 30 flight commander, performs the Waste and Hygiene Compartment (WHC) yearly maintenance in the Tranquility node of the International Space Station. The maintenance included removing and replacing the urine hydraulic components which include urine lines, urine valve block and urine pressure sensors, and removing and replacing the Flush Water Tank Pressure Sensor.

  3. The Key Points of Maintenance Therapy for Dental Implants: A Literature Review.

    PubMed

    Pirc, Miha; Dragan, Irina F

    2017-04-01

    Dental implants require lifelong maintenance and care. Success is defined by biologic factors (presence of inflamed soft tissues surrounding dental implants and radiographic changes in the crestal bone levels) and mechanical factors (stability of the implant fixture and implant supported restoration, etc). Most implant failures are initiated by incipient stages of inflammatory processes, which lead to peri-mucositis and peri-implantitis. The evidence regarding the value of maintenance protocol regarding implants is sparse compared with the one for teeth. This article addresses the existing literature on processes for oral hygiene for implant care.

  4. Optimal maintenance of a multi-unit system under dependencies

    NASA Astrophysics Data System (ADS)

    Sung, Ho-Joon

    The availability, or reliability, of an engineering component greatly influences the operational cost and safety characteristics of a modern system over its life-cycle. Until recently, the reliance on past empirical data has been the industry-standard practice to develop maintenance policies that provide the minimum level of system reliability. Because such empirically-derived policies are vulnerable to unforeseen or fast-changing external factors, recent advancements in the study of topic on maintenance, which is known as optimal maintenance problem, has gained considerable interest as a legitimate area of research. An extensive body of applicable work is available, ranging from those concerned with identifying maintenance policies aimed at providing required system availability at minimum possible cost, to topics on imperfect maintenance of multi-unit system under dependencies. Nonetheless, these existing mathematical approaches to solve for optimal maintenance policies must be treated with caution when considered for broader applications, as they are accompanied by specialized treatments to ease the mathematical derivation of unknown functions in both objective function and constraint for a given optimal maintenance problem. These unknown functions are defined as reliability measures in this thesis, and theses measures (e.g., expected number of failures, system renewal cycle, expected system up time, etc.) do not often lend themselves to possess closed-form formulas. It is thus quite common to impose simplifying assumptions on input probability distributions of components' lifetime or repair policies. Simplifying the complex structure of a multi-unit system to a k-out-of-n system by neglecting any sources of dependencies is another commonly practiced technique intended to increase the mathematical tractability of a particular model. This dissertation presents a proposal for an alternative methodology to solve optimal maintenance problems by aiming to achieve the same end-goals as Reliability Centered Maintenance (RCM). RCM was first introduced to the aircraft industry in an attempt to bridge the gap between the empirically-driven and theory-driven approaches to establishing optimal maintenance policies. Under RCM, qualitative processes that enable the prioritizing of functions based on the criticality and influence would be combined with mathematical modeling to obtain the optimal maintenance policies. Where this thesis work deviates from RCM is its proposal to directly apply quantitative processes to model the reliability measures in optimal maintenance problem. First, Monte Carlo (MC) simulation, in conjunction with a pre-determined Design of Experiments (DOE) table, can be used as a numerical means of obtaining the corresponding discrete simulated outcomes of the reliability measures based on the combination of decision variables (e.g., periodic preventive maintenance interval, trigger age for opportunistic maintenance, etc.). These discrete simulation results can then be regressed as Response Surface Equations (RSEs) with respect to the decision variables. Such an approach to represent the reliability measures with continuous surrogate functions (i.e., the RSEs) not only enables the application of the numerical optimization technique to solve for optimal maintenance policies, but also obviates the need to make mathematical assumptions or impose over-simplifications on the structure of a multi-unit system for the sake of mathematical tractability. The applicability of the proposed methodology to a real-world optimal maintenance problem is showcased through its application to a Time Limited Dispatch (TLD) of Full Authority Digital Engine Control (FADEC) system. In broader terms, this proof-of-concept exercise can be described as a constrained optimization problem, whose objective is to identify the optimal system inspection interval that guarantees a certain level of availability for a multi-unit system. A variety of reputable numerical techniques were used to model the problem as accurately as possible, including algorithms for the MC simulation, imperfect maintenance model from quasi renewal processes, repair time simulation, and state transition rules. Variance Reduction Techniques (VRTs) were also used in an effort to enhance MC simulation efficiency. After accurate MC simulation results are obtained, the RSEs are generated based on the goodness-of-fit measure to yield as parsimonious model as possible to construct the optimization problem. Under the assumption of constant failure rate for lifetime distributions, the inspection interval from the proposed methodology was found to be consistent with the one from the common approach used in industry that leverages Continuous Time Markov Chain (CTMC). While the latter does not consider maintenance cost settings, the proposed methodology enables an operator to consider different types of maintenance cost settings, e.g., inspection cost, system corrective maintenance cost, etc., to result in more flexible maintenance policies. When the proposed methodology was applied to the same TLD of FADEC example, but under the more generalized assumption of strictly Increasing Failure Rate (IFR) for lifetime distribution, it was shown to successfully capture component wear-out, as well as the economic dependencies among the system components.

  5. Louisiana DOTD maintenance budget allocation system: final report.

    DOT National Transportation Integrated Search

    2002-11-01

    This project developed a computer system to assist Louisiana Department of Transportation and Development (LA DOTD) maintenance managers in the preparation of zero-based, needs-driven annual budget plans for routine maintenance. This includes pavemen...

  6. Maintenance & construction operations user service : an addendum to the ITS program plan

    DOT National Transportation Integrated Search

    2001-01-26

    The Maintenance and Construction Operations User Service describes the need for integrating key activities. Generally, key Maintenance and Construction Operations (MCO) activities include monitoring, operating, maintaining, improving, and managing th...

  7. 47 CFR 54.301 - Local switching support.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Items Account 7500 IV Other Non-Current Assets Included in Account 1410 Deferred Maintenance and... Liabilities (Included in Account 4300); and Deferred Maintenance and Retirements (Included in Account 1438... Accounts 2005, 2680, 2690, 3410 Net Deferred Operating Income Taxes Accounts 4100, 4340 Network Support...

  8. 47 CFR 54.301 - Local switching support.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Items Account 7500 IV Other Non-Current Assets Included in Account 1410 Deferred Maintenance and... Liabilities (Included in Account 4300); and Deferred Maintenance and Retirements (Included in Account 1438... Accounts 2005, 2680, 2690, 3410 Net Deferred Operating Income Taxes Accounts 4100, 4340 Network Support...

  9. 47 CFR 54.301 - Local switching support.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Items Account 7500 IV Other Non-Current Assets Included in Account 1410 Deferred Maintenance and... Liabilities (Included in Account 4300); and Deferred Maintenance and Retirements (Included in Account 1438... Accounts 2005, 2680, 2690, 3410 Net Deferred Operating Income Taxes Accounts 4100, 4340 Network Support...

  10. Attentional and non-attentional systems in the maintenance of verbal information in working memory: the executive and phonological loops

    PubMed Central

    Camos, Valérie; Barrouillet, Pierre

    2014-01-01

    Working memory is the structure devoted to the maintenance of information at short term during concurrent processing activities. In this respect, the question regarding the nature of the mechanisms and systems fulfilling this maintenance function is of particular importance and has received various responses in the recent past. In the time-based resource-sharing (TBRS) model, we suggest that only two systems sustain the maintenance of information at the short term, counteracting the deleterious effect of temporal decay and interference. A non-attentional mechanism of verbal rehearsal, similar to the one described by Baddeley in the phonological loop model, uses language processes to reactivate phonological memory traces. Besides this domain-specific mechanism, an executive loop allows the reconstruction of memory traces through an attention-based mechanism of refreshing. The present paper reviews evidence of the involvement of these two independent systems in the maintenance of verbal memory items. PMID:25426049

  11. Analysis of EA-18G Growler Engine Maintenance at Naval Air Station Whidbey Island, WA

    DTIC Science & Technology

    2013-06-01

    maintenance. A. NAVAL AVIATION MAINTENANCE PROGRAM The aviation maintenance community considers the NAMP its bible . “The NAMP applies to all...will increase to 114, which is the total number of aircraft at the completion of the acquisition process in year 2018 (increasing by 12 per year...until 2018 where eight will complete the acquisition)  The cost of the F414-GE-400 engine is about 3.7 million dollars. B. CALCULATING THE ENGINE Aₒ

  12. Maintaining close relationships: gratitude as a motivator and a detector of maintenance behavior.

    PubMed

    Kubacka, Kaska E; Finkenauer, Catrin; Rusbult, Caryl E; Keijsers, Loes

    2011-10-01

    This research examined the dual function of gratitude for relationship maintenance in close relationships. In a longitudinal study among married couples, the authors tested the dyadic effects of gratitude over three time points for approximately 4 years following marriage. They found that feelings of gratitude toward a partner stem from the partner's relationship maintenance behaviors, partly because such behaviors create the perception of responsiveness to one's needs. In turn, gratitude motivates partners to engage in relationship maintenance. Hence, the present model emphasizes that gratitude between close partners (a) originates from partners' relationship maintenance behaviors and the perception of a partner's responsiveness and (b) promotes a partner's reciprocal maintenance behaviors. Thus, the authors' findings add credence to their model, in that gratitude contributes to a reciprocal process of relationship maintenance, whereby each partner's maintenance behaviors, perceptions of responsiveness, and feelings of gratitude feed back on and influence the other's behaviors, perceptions, and feelings.

  13. A Brain System for Auditory Working Memory.

    PubMed

    Kumar, Sukhbinder; Joseph, Sabine; Gander, Phillip E; Barascud, Nicolas; Halpern, Andrea R; Griffiths, Timothy D

    2016-04-20

    The brain basis for auditory working memory, the process of actively maintaining sounds in memory over short periods of time, is controversial. Using functional magnetic resonance imaging in human participants, we demonstrate that the maintenance of single tones in memory is associated with activation in auditory cortex. In addition, sustained activation was observed in hippocampus and inferior frontal gyrus. Multivoxel pattern analysis showed that patterns of activity in auditory cortex and left inferior frontal gyrus distinguished the tone that was maintained in memory. Functional connectivity during maintenance was demonstrated between auditory cortex and both the hippocampus and inferior frontal cortex. The data support a system for auditory working memory based on the maintenance of sound-specific representations in auditory cortex by projections from higher-order areas, including the hippocampus and frontal cortex. In this work, we demonstrate a system for maintaining sound in working memory based on activity in auditory cortex, hippocampus, and frontal cortex, and functional connectivity among them. Specifically, our work makes three advances from the previous work. First, we robustly demonstrate hippocampal involvement in all phases of auditory working memory (encoding, maintenance, and retrieval): the role of hippocampus in working memory is controversial. Second, using a pattern classification technique, we show that activity in the auditory cortex and inferior frontal gyrus is specific to the maintained tones in working memory. Third, we show long-range connectivity of auditory cortex to hippocampus and frontal cortex, which may be responsible for keeping such representations active during working memory maintenance. Copyright © 2016 Kumar et al.

  14. Support and Maintenance of the International Monitoring System network

    NASA Astrophysics Data System (ADS)

    Pereira, Jose; Bazarragchaa, Sergelen; Kilgour, Owen; Pretorius, Jacques; Werzi, Robert; Beziat, Guillaume; Hamani, Wacel; Mohammad, Walid; Brely, Natalie

    2014-05-01

    The Monitoring Facilities Support Section of the Provisional Technical Secretariat (PTS) has as its main task to ensure optimal support and maintenance of an array of 321 monitoring stations and 16 radionuclide laboratories distributed worldwide. Raw seismic, infrasonic, hydroacoustic and radionuclide data from these facilities constitutes the basic product delivered by the International Monitoring System (IMS). In the process of maintaining such a wide array of stations of different technologies, the Support Section contributes to ensuring station mission capability. Mission capable data availability according to the IMS requirements should be at least 98% annually (no more than 7 days down time per year per waveform stations - 14 continuous for radionuclide stations) for continuous data sending stations. In this presentation, we will present our case regarding our intervention at stations to address equipment supportability and maintainability, as these are particularly large activities requiring the removal of a substantial part of the station equipment and installation of new equipment. The objective is always to plan these activities while minimizing downtime and continuing to meet all IMS requirements, including those of data availability mentioned above. We postulate that these objectives are better achieved by planning and making use of preventive maintenance, as opposed to "run-to-failure" with associated corrective maintenance. We use two recently upgraded Infrasound Stations (IS39 Palau and IS52 BIOT) as a case study and establish a comparison between these results and several other stations where corrective maintenance was performed, to demonstrate our hypothesis.

  15. 75 FR 7411 - Schedule of Water Charges

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... sale revenues, while the costs of reservoir maintenance and operations, contractual services and..., ``including debt service, operation, maintenance, replacement, reserves, and associated administrative costs... holds funds dedicated to pay the costs of project construction, operation, maintenance, and replacement...

  16. The Impact Of Occupational Hazards In Workplaces - Maintenance, A Main Target For Ensuring The Safety Of Working Equipment

    NASA Astrophysics Data System (ADS)

    Antonov, Anca Elena; Buica, Georgeta; Darabont, Doru Costin; Beiu, Constantin

    2015-07-01

    For use of work equipment having the economic performance and the highest level of safety, it must be ensured that it complies with the conditions set by the manufacturer in terms of putting into service, use and maintenance operations, ensuring appropriate technical and environmental requirements, including appropriate measures and means of protection. The research aimed to identify and analyze the occupational hazards associated to maintenance operations, in terms of the history of the adjustments, maintenance, cleaning and repair, including the case that occur after the incidents, capital repairs and upgrades. The results of the research consisted in the development of recommendations on the effective management of maintenance activities of work equipment and a software model to enable an efficient management of maintenance, as a tool for occupational hazards in companies - premise for increasing the competitiveness of employers in the market economy.

  17. AN INVESTIGATION OF THE TRAINING AND SKILL REQUIREMENTS OF INDUSTRIAL MACHINERY MAINTENANCE WORKERS. VOLUME II. FINAL REPORT.

    ERIC Educational Resources Information Center

    LYNN, FRANK

    THE APPENDIXES FOR "AN INVESTIGATION OF THE TRAINING AND SKILL REQUIREMENTS OF INDUSTRIAL MACHINERY MAINTENANCE WORKERS, FINAL REPORT, VOLUME I" (VT 004 006) INCLUDE (1) TWO LETTERS FROM PLANT ENGINEERS STRESSING THE IMPORTANCE OF TRAINING MACHINERY MAINTENANCE WORKERS, (2) A DESCRIPTION OF THE MAINTENANCE TRAINING SURVEY, A SAMPLE QUESTIONNAIRE,…

  18. Working memory load and distraction: dissociable effects of visual maintenance and cognitive control.

    PubMed

    Konstantinou, Nikos; Beal, Eleanor; King, Jean-Remi; Lavie, Nilli

    2014-10-01

    We establish a new dissociation between the roles of working memory (WM) cognitive control and visual maintenance in selective attention as measured by the efficiency of distractor rejection. The extent to which focused selective attention can prevent distraction has been shown to critically depend on the level and type of load involved in the task. High perceptual load that consumes perceptual capacity leads to reduced distractor processing, whereas high WM load that reduces WM ability to exert priority-based executive cognitive control over the task results in increased distractor processing (e.g., Lavie, Trends in Cognitive Sciences, 9(2), 75-82, 2005). WM also serves to maintain task-relevant visual representations, and such visual maintenance is known to recruit the same sensory cortices as those involved in perception (e.g., Pasternak & Greenlee, Nature Reviews Neuroscience, 6(2), 97-107, 2005). These findings led us to hypothesize that loading WM with visual maintenance would reduce visual capacity involved in perception, thus resulting in reduced distractor processing-similar to perceptual load and opposite to WM cognitive control load. Distractor processing was assessed in a response competition task, presented during the memory interval (or during encoding; Experiment 1a) of a WM task. Loading visual maintenance or encoding by increased set size for a memory sample of shapes, colors, and locations led to reduced distractor response competition effects. In contrast, loading WM cognitive control with verbal rehearsal of a random letter set led to increased distractor effects. These findings confirm load theory predictions and provide a novel functional distinction between the roles of WM maintenance and cognitive control in selective attention.

  19. Future-oriented maintenance strategy based on automated processes is finding its way into large astronomical facilities at remote observing sites

    NASA Astrophysics Data System (ADS)

    Silber, Armin; Gonzalez, Christian; Pino, Francisco; Escarate, Patricio; Gairing, Stefan

    2014-08-01

    With expanding sizes and increasing complexity of large astronomical observatories on remote observing sites, the call for an efficient and recourses saving maintenance concept becomes louder. The increasing number of subsystems on telescopes and instruments forces large observatories, like in industries, to rethink conventional maintenance strategies for reaching this demanding goal. The implementation of full-, or semi-automatic processes for standard service activities can help to keep the number of operating staff on an efficient level and to reduce significantly the consumption of valuable consumables or equipment. In this contribution we will demonstrate on the example of the 80 Cryogenic subsystems of the ALMA Front End instrument, how an implemented automatic service process increases the availability of spare parts and Line Replaceable Units. Furthermore how valuable staff recourses can be freed from continuous repetitive maintenance activities, to allow focusing more on system diagnostic tasks, troubleshooting and the interchanging of line replaceable units. The required service activities are decoupled from the day-to-day work, eliminating dependencies on workload peaks or logistic constrains. The automatic refurbishing processes running in parallel to the operational tasks with constant quality and without compromising the performance of the serviced system components. Consequentially that results in an efficiency increase, less down time and keeps the observing schedule on track. Automatic service processes in combination with proactive maintenance concepts are providing the necessary flexibility for the complex operational work structures of large observatories. The gained planning flexibility is allowing an optimization of operational procedures and sequences by considering the required cost efficiency.

  20. Inertial Fusion Power Plant Concept of Operations and Maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anklam, T.; Knutson, B.; Dunne, A. M.

    2015-01-15

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oilmore » refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.« less

  1. Inertial fusion power plant concept of operations and maintenance

    NASA Astrophysics Data System (ADS)

    Knutson, Brad; Dunne, Mike; Kasper, Jack; Sheehan, Timothy; Lang, Dwight; Anklam, Tom; Roberts, Valerie; Mau, Derek

    2015-02-01

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

  2. Data Processing Aspects of MEDLARS

    PubMed Central

    Austin, Charles J.

    1964-01-01

    The speed and volume requirements of MEDLARS necessitate the use of high-speed data processing equipment, including paper-tape typewriters, a digital computer, and a special device for producing photo-composed output. Input to the system is of three types: variable source data, including citations from the literature and search requests; changes to such master files as the medical subject headings list and the journal record file; and operating instructions such as computer programs and procedures for machine operators. MEDLARS builds two major stores of data on magnetic tape. The Processed Citation File includes bibliographic citations in expanded form for high-quality printing at periodic intervals. The Compressed Citation File is a coded, time-sequential citation store which is used for high-speed searching against demand request input. Major design considerations include converting variable-length, alphanumeric data to mechanical form quickly and accurately; serial searching by the computer within a reasonable period of time; high-speed printing that must be of graphic quality; and efficient maintenance of various complex computer files. PMID:14119287

  3. DATA PROCESSING ASPECTS OF MEDLARS.

    PubMed

    AUSTIN, C J

    1964-01-01

    The speed and volume requirements of MEDLARS necessitate the use of high-speed data processing equipment, including paper-tape typewriters, a digital computer, and a special device for producing photo-composed output. Input to the system is of three types: variable source data, including citations from the literature and search requests; changes to such master files as the medical subject headings list and the journal record file; and operating instructions such as computer programs and procedures for machine operators. MEDLARS builds two major stores of data on magnetic tape. The Processed Citation File includes bibliographic citations in expanded form for high-quality printing at periodic intervals. The Compressed Citation File is a coded, time-sequential citation store which is used for high-speed searching against demand request input. Major design considerations include converting variable-length, alphanumeric data to mechanical form quickly and accurately; serial searching by the computer within a reasonable period of time; high-speed printing that must be of graphic quality; and efficient maintenance of various complex computer files.

  4. The ratio of NPP to GPP: evidence of change over the course of stand development.

    PubMed

    Mäkelä, A; Valentine, H T

    2001-09-01

    Using Scots pine (Pinus sylvestris L.) in Fenno-Scandia as a case study, we investigate whether net primary production (NPP) and maintenance respiration are constant fractions of gross primary production (GPP) as even-aged mono-specific stands progress from initiation to old age. A model of the ratio of NPP to GPP is developed based on (1) the classical model of respiration, which divides total respiration into construction and maintenance components, and (2) a process-based model, which derives respiration from processes including construction, nitrate uptake and reduction, ion uptake, phloem loading and maintenance. Published estimates of specific respiration and production rates, and some recent measurements of components of dry matter in stands of different ages, are used to quantify the two approaches over the course of stand development in an average environment. Both approaches give similar results, showing a decrease in the NPP/GPP ratio with increasing tree height. In addition, we show that stand-growth models fitted under three different sets of assumptions-(i) annual specific rates of maintenance respiration of sapwood (mW) and photosynthesis (sC) are constant; (ii) m(W) is constant, but sC decreases with increasing tree height; and (iii) total maintenance respiration is a constant fraction of GPP and s(C) decreases with increasing tree height-can lead to nearly identical model projections that agree with empirical observations of NPP and stand-growth variables. Remeasurements of GPP and respiration over time in chronosequences of stands may be needed to discern which set of assumptions is correct. Total (construction + maintenance) sapwood respiration per unit mass of sapwood (kg C (kg C year)-1) decreased with increasing stand age, sapwood stock, and average tree height under all three assumptions. However, total sapwood respiration (kg C (ha year)-1) increased over the course of stand development under (i) and (ii), contributing to a downward trend in the time course of the NPP/GPP ratio after closure. A moderate decrease in mW with increasing tree height or sapwood cross-sectional area had little effect on the downward trend. On the basis of this evidence, we argue that a significant decline in the NPP/GPP ratio with tree size or age seems highly probable, although the decline may appear insignificant over some segments of stand development. We also argue that, because stand-growth models can give correct answers for the wrong reasons, statistical calibration of such models should be avoided whenever possible; instead, values of physiological parameters should come from measurements of the physiological processes themselves.

  5. Turnaround Time Modeling for Conceptual Rocket Engines

    NASA Technical Reports Server (NTRS)

    Nix, Michael; Staton, Eric J.

    2004-01-01

    Recent years have brought about a paradigm shift within NASA and the Space Launch Community regarding the performance of conceptual design. Reliability, maintainability, supportability, and operability are no longer effects of design; they have moved to the forefront and are affecting design. A primary focus of this shift has been a planned decrease in vehicle turnaround time. Potentials for instituting this decrease include attacking the issues of removing, refurbishing, and replacing the engines after each flight. less, it is important to understand the operational affects of an engine on turnaround time, ground support personnel and equipment. One tool for visualizing this relationship involves the creation of a Discrete Event Simulation (DES). A DES model can be used to run a series of trade studies to determine if the engine is meeting its requirements, and, if not, what can be altered to bring it into compliance. Using DES, it is possible to look at the ways in which labor requirements, parallel maintenance versus serial maintenance, and maintenance scheduling affect the overall turnaround time. A detailed DES model of the Space Shuttle Main Engines (SSME) has been developed. Trades may be performed using the SSME Processing Model to see where maintenance bottlenecks occur, what the benefits (if any) are of increasing the numbers of personnel, or the number and location of facilities, in addition to trades previously mentioned, all with the goal of optimizing the operational turnaround time and minimizing operational cost. The SSME Processing Model was developed in such a way that it can easily be used as a foundation for developing DES models of other operational or developmental reusable engines. Performing a DES on a developmental engine during the conceptual phase makes it easier to affect the design and make changes to bring about a decrease in turnaround time and costs.

  6. Does your equipment maintenance management program measure up?

    PubMed

    Deinstadt, Deborah C

    2003-01-01

    Identifying a clear maintenance philosophy is the first step toward choosing the right program for your healthcare organization. The second step is gaining a clear understanding of how proposed savings and improvements will be delivered. The third and last step is requiring that the proposed company or manager have specific tools in place for measuring and analyzing program performance. There are three primary philosophies underlying current equipment management options. These include risk-transfer philosophy (e.g., maintenance insurance, service contracts, multi-vendor and outsource programs), asset management philosophy (e.g., programs delivering a management system based on managed time-and-materials), and internal management (in-house managed programs). The last step in selecting the right program is insisting that proper performance measurements be built into the proposed management program. A well-managed program provides results in three general areas: financial outcomes, operational improvements and process improvements. Financial outcomes are the easiest to measure. Operational and process improvements are more challenging to assess but equally important to the program's overall success. To accurately identify results in these three areas, the overall management program should measure the following eight separate components: procedures and support for department staff; equipment inventory, benchmark costs, and budget guidelines; experienced equipment support team; objective, independent analysis of maintenance events; repair documentation and reporting; vendor relations; equipment acquisition analysis; and recommendations for improvement. Do everything you reasonably can to assure that the selected company can work side-by-side with you, providing objective, measurable advice that is ultimately in your best interest. You will then know that you have been thorough in your marketplace selection and can confidently move into implementation, expecting tangible and successful results.

  7. Economic comparison of conventional maintenance and electrochemical oxidation to warrant water safety in dental unit water lines.

    PubMed

    Fischer, Sebastian; Meyer, Georg; Kramer, Axel

    2012-01-01

    In preparation for implementation of a central water processing system at a dental department, we analyzed the costs of conventional decentralized disinfection of dental units against a central water treatment concept based on electrochemical disinfection. The cost evaluation included only the costs of annually required antimicrobial consumables and additional water usage of a decentralize conventional maintenance system for dental water lines build in the respective dental units and the central electrochemical water disinfection system, BLUE SAFETY™ Technologies. In total, analysis of costs of 6 dental departments reviled additional annual costs for hygienic preventive measures of € 4,448.37. For the BLUE SAFETY™ Technology, the additional annual total agent consumption costs were € 2.18, accounting for approximately 0.05% of the annual total agent consumption costs of the conventional maintenance system. For both water processing concepts, the additional costs for energy could not be calculated, since the required data was not obtainable from the manufacturers. For both concepts, the investment and maintenance costs were not calculated due to lack of manufacturer's data. Therefore, the results indicate the difference of costs for the required consumables only. Aside of the significantly lower annual costs for required consumables and disinfectants; a second advantage for the BLUE SAFETY™ Technology is its constant and automatic operation, which does not require additional staff resources. This not only safety human resources, but add additionally to cost saving. Since the antimicrobial disinfection capacity of the BLUE SAFETY™ was demonstrated previously and is well known, this technology, which is comparable or even superior in its non-corrosive effect, may be regarded as method of choice for continuous disinfection and prevention of biofilm formation in dental units' water lines.

  8. Economic comparison of conventional maintenance and electrochemical oxidation to warrant water safety in dental unit water lines

    PubMed Central

    Fischer, Sebastian; Meyer, Georg; Kramer, Axel

    2012-01-01

    Background: In preparation for implementation of a central water processing system at a dental department, we analyzed the costs of conventional decentralized disinfection of dental units against a central water treatment concept based on electrochemical disinfection. Methods: The cost evaluation included only the costs of annually required antimicrobial consumables and additional water usage of a decentralize conventional maintenance system for dental water lines build in the respective dental units and the central electrochemical water disinfection system, BLUE SAFETY™ Technologies. Results: In total, analysis of costs of 6 dental departments reviled additional annual costs for hygienic preventive measures of € 4,448.37. For the BLUE SAFETY™ Technology, the additional annual total agent consumption costs were € 2.18, accounting for approximately 0.05% of the annual total agent consumption costs of the conventional maintenance system. For both water processing concepts, the additional costs for energy could not be calculated, since the required data was not obtainable from the manufacturers. Discussion: For both concepts, the investment and maintenance costs were not calculated due to lack of manufacturer's data. Therefore, the results indicate the difference of costs for the required consumables only. Aside of the significantly lower annual costs for required consumables and disinfectants; a second advantage for the BLUE SAFETY™ Technology is its constant and automatic operation, which does not require additional staff resources. This not only safety human resources, but add additionally to cost saving. Conclusion: Since the antimicrobial disinfection capacity of the BLUE SAFETY™ was demonstrated previously and is well known, this technology, which is comparable or even superior in its non-corrosive effect, may be regarded as method of choice for continuous disinfection and prevention of biofilm formation in dental units’ water lines. PMID:22558042

  9. Ethnobotany, diverse food uses, claimed health benefits and implications on conservation of barley landraces in North Eastern Ethiopia highlands

    PubMed Central

    2011-01-01

    Background Barley is the number one food crop in the highland parts of North Eastern Ethiopia produced by subsistence farmers grown as landraces. Information on the ethnobotany, food utilization and maintenance of barley landraces is valuable to design and plan germplasm conservation strategies as well as to improve food utilization of barley. Methods A study, involving field visits and household interviews, was conducted in three administrative zones. Eleven districts from the three zones, five kebeles in each district and five households from each kebele were visited to gather information on the ethnobotany, the utilization of barley and how barley end-uses influence the maintenance of landrace diversity. Results According to farmers, barley is the "king of crops" and it is put for diverse uses with more than 20 types of barley dishes and beverages reportedly prepared in the study area. The products are prepared from either boiled/roasted whole grain, raw- and roasted-milled grain, or cracked grain as main, side, ceremonial, and recuperating dishes. The various barley traditional foods have perceived qualities and health benefits by the farmers. Fifteen diverse barley landraces were reported by farmers, and the ethnobotany of the landraces reflects key quantitative and qualitative traits. Some landraces that are preferred for their culinary qualities are being marginalized due to moisture shortage and soil degradation. Conclusions Farmers' preference of different landraces for various end-use qualities is one of the important factors that affect the decision process of landraces maintenance, which in turn affect genetic diversity. Further studies on improving maintenance of landraces, developing suitable varieties and improving the food utilization of barley including processing techniques could contribute to food security of the area. PMID:21711566

  10. Intelligent Work Process Engineering System

    NASA Technical Reports Server (NTRS)

    Williams, Kent E.

    2003-01-01

    Optimizing performance on work activities and processes requires metrics of performance for management to monitor and analyze in order to support further improvements in efficiency, effectiveness, safety, reliability and cost. Information systems are therefore required to assist management in making timely, informed decisions regarding these work processes and activities. Currently information systems regarding Space Shuttle maintenance and servicing do not exist to make such timely decisions. The work to be presented details a system which incorporates various automated and intelligent processes and analysis tools to capture organize and analyze work process related data, to make the necessary decisions to meet KSC organizational goals. The advantages and disadvantages of design alternatives to the development of such a system will be discussed including technologies, which would need to bedesigned, prototyped and evaluated.

  11. 37 CFR 1.17 - Patent application and reexamination processing fees.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... decision on petition refusing to accept delayed payment of maintenance fee in an expired patent. § 1.741(b... and record payment of a maintenance fee filed prior to expiration of a patent. § 1.550(c)—for patent... application from issue. § 1.314—to defer issuance of a patent. (i) Processing fee for taking action under one...

  12. Space shuttle recommendations based on aircraft maintenance experience

    NASA Technical Reports Server (NTRS)

    Spears, J. M.; Fox, C. L.

    1972-01-01

    Space shuttle design recommendations based on aircraft maintenance experience are developed. The recommendations are specifically applied to the landing gear system, nondestructive inspection techniques, hydraulic system design, materials and processes, and program support.

  13. Serial recall of visuospatial and verbal information with and without material-specific interference: implications for contemporary models of working memory.

    PubMed

    Davis, Lynne C; Rane, Shruti; Hiscock, Merrill

    2013-01-01

    A longstanding question in working memory (WM) research concerns the fractionation of verbal and nonverbal processing. Although some contemporary models include both domain-specific and general-purpose mechanisms, the necessity to postulate differential processing of verbal and nonverbal material remains unclear. In the present two-experiment series we revisit the order reconstruction paradigm that Jones, Farrand, Stuart, and Morris (1995) used to support a unitary model of WM. Goals were to assess (1) whether serial position curves for dot positions differ from curves for letter names; and (2) whether selective interference can be demonstrated. Although we replicated Jones et al.'s finding of similar serial position curves for the two tasks, this similarity could reflect the demands of the order reconstruction paradigm rather than undifferentiated processing of verbal and nonverbal stimuli. Both generalised and material-specific interference was found, which can be attributed to competition between primary and secondary tasks for attentional resources. As performance levels for the combined primary and secondary tasks exceed active WM capacity limits, primary task items apparently are removed from active memory during processing of the secondary list and held temporarily in maintenance storage. We conclude that active WM is multimodal but maintenance stores may be domain specific.

  14. Omcg1 is critically required for mitosis in rapidly dividing mouse intestinal progenitors and embryonic stem cells.

    PubMed

    Léguillier, Teddy; Vandormael-Pournin, Sandrine; Artus, Jérôme; Houlard, Martin; Picard, Christel; Bernex, Florence; Robine, Sylvie; Cohen-Tannoudji, Michel

    2012-07-15

    Recent studies have shown that factors involved in transcription-coupled mRNA processing are important for the maintenance of genome integrity. How these processes are linked and regulated in vivo remains largely unknown. In this study, we addressed in the mouse model the function of Omcg1, which has been shown to participate in co-transcriptional processes, including splicing and transcription-coupled repair. Using inducible mouse models, we found that Omcg1 is most critically required in intestinal progenitors. In absence of OMCG1, proliferating intestinal epithelial cells underwent abnormal mitosis followed by apoptotic cell death. As a consequence, the crypt proliferative compartment of the small intestine was quickly and totally abrogated leading to the rapid death of the mice. Lack of OMCG1 in embryonic stem cells led to a similar cellular phenotype, with multiple mitotic defects and rapid cell death. We showed that mutant intestinal progenitors and embryonic stem cells exhibited a reduced cell cycle arrest following irradiation, suggesting that mitotic defects may be consecutive to M phase entry with unrepaired DNA damages. These findings unravel a crucial role for pre-mRNA processing in the homeostasis of the small intestine and point to a major role of OMCG1 in the maintenance of genome integrity.

  15. Effect of cognitive load on working memory forgetting in aging.

    PubMed

    Baumans, Christine; Adam, Stephane; Seron, Xavier

    2012-01-01

    Functional approaches to working memory (WM) have been proposed recently to better investigate "maintenance" and "processing" mechanisms. The cognitive load (CL) hypothesis presented in the "Time-Based Resource-Sharing" model (Barrouillet & Camos, 2007) suggests that forgetting from WM (maintenance) can be investigated by varying the presentation rate and processing speed (processing). In this study, young and elderly participants were compared on WM tasks in which the difference in processing speed was controlled by CL manipulations. Two main results were found. First, when time constraints (CL) were matched for the two groups, no aging effect was observed. Second, whereas a large variation in CL affected WM performance, a small CL manipulation had no effect on the elderly. This suggests that WM forgetting cannot be completely accounted for by the CL hypothesis. Rather, it highlights the need to explore restoration times in particular, and the nature of the refreshment mechanisms within maintenance.

  16. Selective attention supports working memory maintenance by modulating perceptual processing of distractors.

    PubMed

    Sreenivasan, Kartik K; Jha, Amishi P

    2007-01-01

    Selective attention has been shown to bias sensory processing in favor of relevant stimuli and against irrelevant or distracting stimuli in perceptual tasks. Increasing evidence suggests that selective attention plays an important role during working memory maintenance, possibly by biasing sensory processing in favor of to-be-remembered items. In the current study, we investigated whether selective attention may also support working memory by biasing processing against irrelevant and potentially distracting information. Event-related potentials (ERPs) were recorded while subjects (n = 22) performed a delayed-recognition task for faces and shoes. The delay period was filled with face or shoe distractors. Behavioral performance was impaired when distractors were congruent with the working memory domain (e.g., face distractor during working memory for faces) relative to when distractors were incongruent with the working memory domain (e.g., face distractor during shoe working memory). If attentional biasing against distractor processing is indeed functionally relevant in supporting working memory maintenance, perceptual processing of distractors is predicted to be attenuated when distractors are more behaviorally intrusive relative to when they are nonintrusive. As such, we predicted that perceptual processing of distracting faces, as measured by the face-sensitive N170 ERP component, would be reduced in the context of congruent (face) working memory relative to incongruent (shoe) working memory. The N170 elicited by distracting faces demonstrated reduced amplitude during congruent versus incongruent working memory. These results suggest that perceptual processing of distracting faces may be attenuated due to attentional biasing against sensory processing of distractors that are most behaviorally intrusive during working memory maintenance.

  17. Using virtual reality to investigate psychological processes and mechanisms associated with the onset and maintenance of psychosis: a systematic review.

    PubMed

    Valmaggia, Lucia R; Day, Fern; Rus-Calafell, Mar

    2016-07-01

    In the last decade researchers have embraced virtual reality to explore the psychological processes and mechanisms that are involved in the onset and maintenance of psychosis. A systematic review was conducted to synthesise the evidence of using virtual reality to investigate these mechanisms. Web of Science, PsycINFO, Embase, and Medline were searched. Reference lists of collected papers were also visually inspected to locate any relevant cited journal articles. In total 6001 articles were potentially eligible for inclusion; of these, 16 studies were included in the review. The review identified studies investigating the effect of interpersonal sensitivity, childhood bullying victimisation, physical assault, perceived ethnic discrimination, social defeat, population density and ethnic density on the real-time appraisal of VR social situations. Further studies demonstrated the potential of VR to investigate paranoid ideation, anomalous experiences, self-confidence, self-comparison, physiological activation and behavioural response. The reviewed studies suggest that VR can be used to investigate psychological processes and mechanisms associated with psychosis. Implications for further experimental research, as well as for assessment and clinical practise are discussed. The present review has been registered in the PROSPERO register: CRD42016038085.

  18. ORAM-SENTINEL{trademark} demonstration at Fitzpatrick. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, L.K.; Anderson, V.M.; Mohammadi, K.

    1998-06-01

    New York Power Authority, in cooperation with EPRI, installed the ORAM-SENTINEL{trademark} software at James A. Fitzpatrick (JAF) Nuclear Power Plant. This software incorporates models of safety systems and support systems that are used for defense-in-depth in the plant during outage and on-line periods. A secondary goal was to include some pre-analyzed risk results to validate the methodology for quantitative assessment of the plant risks during proposed on-line maintenance. During the past year, New York Power Authority personnel have become familiar with the formal computerized Safety Assessment process associated with on-line and outage maintenance. The report describes techniques and lessons learnedmore » during development of the ORAM-SENTINEL model at JAF. It overviews the systems important to the Safety Function Assessment Process and provides details on development of the Plant Transient Assessment process using the station emergency operating procedures. The assessment results are displayed by color (green, yellow, orange, red) to show decreasing safety conditions. The report describes use of the JAF Probabilistic Safety Assessment within the ORAM-SENTINEL code to calculate an instantaneous core damage frequency and the criteria by which this frequency is translated to a color indicator.« less

  19. Continuous Energy Improvement in Motor Driven Systems - A Guidebook for Industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilbert A. McCoy and John G. Douglass

    2014-02-01

    This guidebook provides a step-by-step approach to developing a motor system energy-improvement action plan. An action plan includes which motors should be repaired or replaced with higher efficiency models, recommendations on maintaining a spares inventory, and discussion of improvements in maintenance practices. The guidebook is the successor to DOE’s 1997 Energy Management for Motor Driven Systems. It builds on its predecessor publication by including topics such as power transmission systems and matching driven equipment to process requirements in addition to motors.

  20. TCMS operations and maintenance philosophy

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Griffin, Rock E.

    1992-01-01

    The purpose is to describe the basic philosophies of operating and maintaining the Test, Control, and Monitor System (TCMS) equipment. TCMS is a complex and sophisticated checkout system. Operations and maintenance processes developed to support it will be based upon current experience, but will be focused on the specific needs of TCMS in support of Space Station Freedom Program (SSFP) and related activities. An overview of the operations and maintenance goals and philosophies are presented. The assumptions, roles and responsibilities, concepts and interfaces for operation, on-line maintenance, off-line support, and Operations and Maintenance (O&M) personnel training on all TCMS equipment located at KSC are described.

  1. Research and development plan for the Slagging Pyrolysis Incinerator. [For TRU waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hedahl, T.G.; McCormack, M.D.

    1979-01-01

    Objective is to develop an incinerator for processing disposed transuranium waste. This R and D plan describes the R and D efforts required to begin conceptual design of the Slagging Pyrolysis Incinerator (Andco-Torrax). The program includes: incinerator, off-gas treatment, waste handling, instrumentation, immobilization analyses, migration studies, regulations, Belgium R and D test plan, Disney World test plan, and remote operation and maintenance. (DLC)

  2. 2010 Annual Report (National Defense Center for Energy and Environment)

    DTIC Science & Technology

    2010-01-01

    a prototype system for reforming JP-8 to enable the use of fuel cells in theater. Energy, water, and waste reduction are tied to NDCEE efforts to...modernize Army ammunition plants , reducing costs and ensuring a steady supply of ammunition to the warfighter. At Fort Campbell, KY, newly...operating costs at Holston and Radford Army Ammunition Plants . Weapon systems ESOHE efforts also included optimizing various depot maintenance processes

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simpson, L.; Britt, J.; Birkmire, R.

    ITN Energy Systems, Inc., and Global Solar Energy, Inc., assisted by NREL's PV Manufacturing R&D program, have continued to advance CIGS production technology by developing trajectory-oriented predictive/control models, fault-tolerance control, control platform development, in-situ sensors, and process improvements. Modeling activities included developing physics-based and empirical models for CIGS and sputter-deposition processing, implementing model-based control, and applying predictive models to the construction of new evaporation sources and for control. Model-based control is enabled by implementing reduced or empirical models into a control platform. Reliability improvement activities include implementing preventive maintenance schedules; detecting failed sensors/equipment and reconfiguring to tinue processing; and systematicmore » development of fault prevention and reconfiguration strategies for the full range of CIGS PV production deposition processes. In-situ sensor development activities have resulted in improved control and indicated the potential for enhanced process status monitoring and control of the deposition processes. Substantial process improvements have been made, including significant improvement in CIGS uniformity, thickness control, efficiency, yield, and throughput. In large measure, these gains have been driven by process optimization, which in turn have been enabled by control and reliability improvements due to this PV Manufacturing R&D program.« less

  4. Development of ergonomics audits for bagging, haul truck and maintenance and repair operations in mining.

    PubMed

    Dempsey, Patrick G; Pollard, Jonisha; Porter, William L; Mayton, Alan; Heberger, John R; Gallagher, Sean; Reardon, Leanna; Drury, Colin G

    2017-12-01

    The development and testing of ergonomics and safety audits for small and bulk bag filling, haul truck and maintenance and repair operations in coal preparation and mineral processing plants found at surface mine sites is described. The content for the audits was derived from diverse sources of information on ergonomics and safety deficiencies including: analysis of injury, illness and fatality data and reports; task analysis; empirical laboratory studies of particular tasks; field studies and observations at mine sites; and maintenance records. These diverse sources of information were utilised to establish construct validity of the modular audits that were developed for use by mine safety personnel. User and interrater reliability testing was carried out prior to finalising the audits. The audits can be implemented using downloadable paper versions or with a free mobile NIOSH-developed Android application called ErgoMine. Practitioner Summary: The methodology used to develop ergonomics audits for three types of mining operations is described. Various sources of audit content are compared and contrasted to serve as a guide for developing ergonomics audits for other occupational contexts.

  5. A performance improvement case study in aircraft maintenance and its implications for hazard identification.

    PubMed

    Ward, Marie; McDonald, Nick; Morrison, Rabea; Gaynor, Des; Nugent, Tony

    2010-02-01

    Aircraft maintenance is a highly regulated, safety critical, complex and competitive industry. There is a need to develop innovative solutions to address process efficiency without compromising safety and quality. This paper presents the case that in order to improve a highly complex system such as aircraft maintenance, it is necessary to develop a comprehensive and ecologically valid model of the operational system, which represents not just what is meant to happen, but what normally happens. This model then provides the backdrop against which to change or improve the system. A performance report, the Blocker Report, specific to aircraft maintenance and related to the model was developed gathering data on anything that 'blocks' task or check performance. A Blocker Resolution Process was designed to resolve blockers and improve the current check system. Significant results were obtained for the company in the first trial and implications for safety management systems and hazard identification are discussed. Statement of Relevance: Aircraft maintenance is a safety critical, complex, competitive industry with a need to develop innovative solutions to address process and safety efficiency. This research addresses this through the development of a comprehensive and ecologically valid model of the system linked with a performance reporting and resolution system.

  6. Air Vehicle Integration and Technology Research (AVIATR). Task Order 0003: Condition-Based Maintenance Plus Structural Integrity (CBM+SI) Demonstration (April 2011 to August 2011)

    DTIC Science & Technology

    2011-08-01

    investigated. Implementation of this technology into the maintenance framework depends on several factors, including safety of the structural system, cost... Maintenance Parameters The F-15 Program has indicated that, in practice , maintenance actions are generally performed on flight hour multiples of 200...Risk Analysis or the Perform Cost Benefit Analysis sections of the flowchart. 4.6. Determine System Configurations The current maintenance practice

  7. 40 CFR 63.2987 - What must my operation, maintenance, and monitoring (OMM) plan include?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., maintenance, and monitoring (OMM) plan include? (a) You must prescribe the monitoring that will be performed...) For the burn cycle that follows the inspection, document that the thermal oxidizer is operating...

  8. 78 FR 33230 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-04

    ...'') section 110(k)(3), EPA is approving a maintenance plan for the 1997 8-hour ozone standard (``San Diego 8-hour maintenance plan'') for the San Diego County 1997 ozone nonattainment area (``San Diego 8-hour... maintenance plan is included in a document titled Redesignation Request and Maintenance Plan for the 1997...

  9. The Coming Paradigm-Shift in Maintenance: From Metals to Composites

    NASA Technical Reports Server (NTRS)

    Hobbs, Alan; Brasil, Connie; Kanki, Barbara

    2009-01-01

    The purpose of this study is to examine the current maintenance practices of airline operators in the detection and repair of damage to composite structures, with the aim of learning lessons that will be applicable to the maintenance of future advanced composite airplanes. A process map was created to capture the events and activities that occur from the moment a damage event occurs, through damage detection, assessment and repair. The study is identifying areas where operational risks may negatively impact the process, where personnel are required to make judgments in the absence of procedural guidance, and areas where future tools or techniques may be of assistance.

  10. Life Cycle Costs in Education: Operations & Maintenance Considered.

    ERIC Educational Resources Information Center

    Moussatche, Helena; Languell-Urquhart, Jennifer; Woodson, Carol

    2000-01-01

    Discusses life cycle cost analysis when deciding on flooring finishes and examines operations and maintenance cost effectiveness relative to hard, resilient, and soft flooring. A chart of evaluated flooring materials' characteristics, appropriate maintenance procedures, and recommended frequency is included. (GR)

  11. Strategic Gang Scheduling for Railroad Maintenance

    DOT National Transportation Integrated Search

    2012-08-14

    We address the railway track maintenance scheduling problem. The problem stems from the : significant percentage of the annual budget invested by the railway industry for maintaining its railway : tracks. The process requires consideration of human r...

  12. 21 CFR 211.182 - Equipment cleaning and use log.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... individual equipment logs that show the date, time, product, and lot number of each batch processed. If... maintenance (or, if the cleaning and maintenance is performed using automated equipment under § 211.68, just...

  13. 27 CFR 19.987 - Maintenance and retention of records.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Accounting for Spirits § 19.987 Maintenance and retention of records. The proprietor shall retain at the... continued use the proprietor shall reproduce the record by a process approved by the appropriate TTB officer...

  14. Extracellular Matrix Degradation and Remodeling in Development and Disease

    PubMed Central

    Lu, Pengfei; Takai, Ken; Weaver, Valerie M.; Werb, Zena

    2011-01-01

    The extracellular matrix (ECM) serves diverse functions and is a major component of the cellular microenvironment. The ECM is a highly dynamic structure, constantly undergoing a remodeling process where ECM components are deposited, degraded, or otherwise modified. ECM dynamics are indispensible during restructuring of tissue architecture. ECM remodeling is an important mechanism whereby cell differentiation can be regulated, including processes such as the establishment and maintenance of stem cell niches, branching morphogenesis, angiogenesis, bone remodeling, and wound repair. In contrast, abnormal ECM dynamics lead to deregulated cell proliferation and invasion, failure of cell death, and loss of cell differentiation, resulting in congenital defects and pathological processes including tissue fibrosis and cancer. Understanding the mechanisms of ECM remodeling and its regulation, therefore, is essential for developing new therapeutic interventions for diseases and novel strategies for tissue engineering and regenerative medicine. PMID:21917992

  15. Savannah River Site Eastern Transportation Hub: A Concept For a DOE Eastern Packaging, Staging and Maintenance Center - 13143

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    England, Jeffery L.; Adams, Karen; Maxted, Maxcine

    2013-07-01

    The Department of Energy (DOE) is working to de-inventory sites and consolidate hazardous materials for processing and disposal. The DOE administers a wide range of certified shipping packages for the transport of hazardous materials to include Special Nuclear Material (SNM), radioactive materials, sealed sources and radioactive wastes. A critical element to successful and safe transportation of these materials is the availability of certified shipping packages. There are over seven thousand certified packagings (i.e., Type B/Type AF) utilized within the DOE for current missions. The synergistic effects of consolidated maintenance, refurbishment, testing, certification, and costing of these services would allow formore » efficient management of the packagings inventory and to support anticipated future in-commerce shipping needs. The Savannah River Site (SRS) receives and ships radioactive materials (including SNM) and waste on a regular basis for critical missions such as consolidated storage, stabilization, purification, or disposition using H-Canyon and HB-Line. The Savannah River National Laboratory (SRNL) has the technical capability and equipment for all aspects of packaging management. SRS has the only active material processing facility in the DOE complex and is one of the sites of choice for nuclear material consolidation. SRS is a logical location to perform maintenance and periodic testing of the DOE fleet of certified packagings. This initiative envisions a DOE Eastern Packaging Staging and Maintenance Center (PSMC) at the SRS and a western hub at the Nevada National Security Site (NNSS), an active DOE Regional Disposal Site. The PSMC's would be the first place DOE would go to meet their radioactive packaging needs and the primary locations projects would go to disposition excess packaging for beneficial reuse. These two hubs would provide the centralized management of a packaging fleet rather than the current approach to design, procure, maintain and dispose of packagings on a project-by-project basis. This initiative provides significant savings in packaging costs and acceleration of project schedules. In addition to certified packaging, the PSMC would be well suited for select designs of 7A Type A packaging and Industrial Packaging. (authors)« less

  16. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    PubMed

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  17. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices

    PubMed Central

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices. PMID:27195666

  18. Apparatus and process for controlling fluidized beds

    DOEpatents

    Rehmat, Amirali G.; Patel, Jitendra G.

    1985-10-01

    An apparatus and process for control and maintenance of fluidized beds under non-steady state conditions. An ash removal conduit is provided for removing solid particulates from a fluidized bed separate from an ash discharge conduit in the lower portion of the grate supporting such a bed. The apparatus and process of this invention is particularly suitable for use in ash agglomerating fluidized beds and provides control of the fluidized bed before ash agglomeration is initiated and during upset conditions resulting in stable, sinter-free fluidized bed maintenance.

  19. Cognitive Reserve and Brain Maintenance: Orthogonal Concepts in Theory and Practice.

    PubMed

    Habeck, C; Razlighi, Q; Gazes, Y; Barulli, D; Steffener, J; Stern, Y

    2017-08-01

    Cognitive Reserve and Brain Maintenance have traditionally been understood as complementary concepts: Brain Maintenance captures the processes underlying the structural preservation of the brain with age, and might be assessed relative to age-matched peers. Cognitive Reserve, on the other hand, refers to how cognitive processing can be performed regardless of how well brain structure has been maintained. Thus, Brain Maintenance concerns the "hardware," whereas Cognitive Reserve concerns "software," that is, brain functioning explained by factors beyond mere brain structure. We used structural brain data from 368 community-dwelling adults, age 20-80, to derive measures of Brain Maintenance and Cognitive Reserve. We found that Brain Maintenance and Cognitive were uncorrelated such that values on one measure did not imply anything about the other measure. Further, both measures were positively correlated with verbal intelligence and education, hinting at formative influences of the latter to both measures. We performed extensive split-half simulations to check our derived measures' statistical robustness. Our approach enables the out-of-sample quantification of Brain Maintenance and Cognitive Reserve for single subjects on the basis of chronological age, neuropsychological performance and structural brain measures. Future work will investigate the prognostic power of these measures with regard to future cognitive status. © The Author 2016. Published by Oxford University Press. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  20. Computer-aided acquisition and logistics support (CALS): Concept of Operations for Depot Maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bourgeois, N.C.; Greer, D.K.

    1993-04-01

    This CALS Concept of Operations for Depot Maintenance provides the foundation strategy and the near term tactical plan for CALS implementation in the depot maintenance environment. The user requirements enumerated and the overarching architecture outlined serve as the primary framework for implementation planning. The seamless integration of depot maintenance business processes and supporting information systems with the emerging global CALS environment will be critical to the efficient realization of depot user's information requirements, and as, such will be a fundamental theme in depot implementations.

  1. Improvement/Maintenance and Reorientation as Central Features of Coping with Major Life Change and Loss: Contributions of Three Life-Span Theories

    ERIC Educational Resources Information Center

    Boerner, Kathrin; Jopp, Daniela

    2007-01-01

    This article focuses on the common and unique contributions of three major life-span theories in addressing improvement/maintenance and reorientation, which represent central processes of coping with major life change and loss. For this purpose, we review and compare the dual-process model of assimilative and accommodative coping, the model of…

  2. Detailed requirements document for the Interactive Financial Management System (IFMS), volume 1

    NASA Technical Reports Server (NTRS)

    Dodson, D. B.

    1975-01-01

    The detailed requirements for phase 1 (online fund control, subauthorization accounting, and accounts receivable functional capabilities) of the Interactive Financial Management System (IFMS) are described. This includes information on the following: systems requirements, performance requirements, test requirements, and production implementation. Most of the work is centered on systems requirements, and includes discussions on the following processes: resources authority, allotment, primary work authorization, reimbursable order acceptance, purchase request, obligation, cost accrual, cost distribution, disbursement, subauthorization performance, travel, accounts receivable, payroll, property, edit table maintenance, end-of-year, backup input. Other subjects covered include: external systems interfaces, general inquiries, general report requirements, communication requirements, and miscellaneous. Subjects covered under performance requirements include: response time, processing volumes, system reliability, and accuracy. Under test requirements come test data sources, general test approach, and acceptance criteria. Under production implementation come data base establishment, operational stages, and operational requirements.

  3. General aviation avionics equipment maintenance

    NASA Technical Reports Server (NTRS)

    Parker, C. D.; Tommerdahl, J. B.

    1978-01-01

    Maintenance of general aviation avionics equipment was investigated with emphasis on single engine and light twin engine general aviation aircraft. Factors considered include the regulatory agencies, avionics manufacturers, avionics repair stations, the statistical character of the general aviation community, and owners and operators. The maintenance, environment, and performance, repair costs, and reliability of avionics were defined. It is concluded that a significant economic stratification is reflected in the maintenance problems encountered, that careful attention to installations and use practices can have a very positive impact on maintenance problems, and that new technologies and a general growth in general aviation will impact maintenance.

  4. Landscaping With Maintenance in Mind.

    ERIC Educational Resources Information Center

    Sorensen, Randy

    2000-01-01

    Examines school ground landscape design that enhances attractive of the school and provides for easier maintenance. Landscape design issues discussed include choice of grass, trees, and shrubs; irrigation; and safety and access. Other considerations for lessening maintenance problems for facility managers are also highlighted. (GR)

  5. Custodial Standards. Revised.

    ERIC Educational Resources Information Center

    Brevard County School District, Rockledge, FL.

    The Brevard County School Board has issued this document detailing maintenance and custodial standards district wide for its schools. The document first addresses the general procedures and maintenance for the school, including universal precautions for the protection of the custodial staff. It then details maintenance and cleaning requirements…

  6. 49 CFR 214.341 - Roadway maintenance machines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY Roadway Worker Protection § 214.341 Roadway maintenance machines. (a) Each employer shall include in its on-track safety program specific provisions for the safety of roadway workers who operate or work near roadway maintenance machines. Those...

  7. 47 CFR 32.1438 - Deferred maintenance and retirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Deferred maintenance and retirements. 32.1438 Section 32.1438 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES....1438 Deferred maintenance and retirements. (a) This account shall include such items as: (1) The...

  8. 47 CFR 32.1438 - Deferred maintenance and retirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Deferred maintenance and retirements. 32.1438 Section 32.1438 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES....1438 Deferred maintenance and retirements. (a) This account shall include such items as: (1) The...

  9. 47 CFR 32.1438 - Deferred maintenance and retirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Deferred maintenance and retirements. 32.1438 Section 32.1438 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES....1438 Deferred maintenance and retirements. (a) This account shall include such items as: (1) The...

  10. 14 CFR 171.161 - Maintenance and operations requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility, including proficiency in maintenance... facility. (2) Maintenance and operations by authorized persons only. (3) Federal Communications Commission...

  11. 14 CFR 171.161 - Maintenance and operations requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility, including proficiency in maintenance... facility. (2) Maintenance and operations by authorized persons only. (3) Federal Communications Commission...

  12. 14 CFR 171.161 - Maintenance and operations requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility, including proficiency in maintenance... facility. (2) Maintenance and operations by authorized persons only. (3) Federal Communications Commission...

  13. 14 CFR 171.161 - Maintenance and operations requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility, including proficiency in maintenance... facility. (2) Maintenance and operations by authorized persons only. (3) Federal Communications Commission...

  14. Design of preventive maintenance system using the reliability engineering and maintenance value stream mapping methods in PT. XYZ

    NASA Astrophysics Data System (ADS)

    Sembiring, N.; Panjaitan, N.; Angelita, S.

    2018-02-01

    PT. XYZ is a company owned by non-governmental organizations engaged in the field of production of rubber processing becoming crumb rubber. Part of the production is supported by some of machines and interacting equipment to achieve optimal productivity. Types of the machine that are used in the production process are Conveyor Breaker, Breaker, Rolling Pin, Hammer Mill, Mill Roll, Conveyor, Shredder Crumb, and Dryer. Maintenance system in PT. XYZ is corrective maintenance i.e. repairing or replacing the engine components after the crash on the machine. Replacement of engine components on corrective maintenance causes the machine to stop operating during the production process is in progress. The result is in the loss of production time due to the operator must replace the damaged engine components. The loss of production time can impact on the production targets which were not reached and lead to high loss costs. The cost for all components is Rp. 4.088.514.505. This cost is really high just for maintaining a Mill Roll Machine. Therefore PT. XYZ is needed to do preventive maintenance i.e. scheduling engine components and improving maintenance efficiency. The used methods are Reliability Engineering and Maintenance Value Stream Mapping (MVSM). The needed data in this research are the interval of time damage to engine components, opportunity cost, labor cost, component cost, corrective repair time, preventive repair time, Mean Time To Opportunity (MTTO), Mean Time To Repair (MTTR), and Mean Time To Yield (MTTY). In this research, the critical components of Mill Roll machine are Spier, Bushing, Bearing, Coupling and Roll. Determination of damage distribution, reliability, MTTF, cost of failure, cost of preventive, current state map, and future state map are done so that the replacement time for each critical component with the lowest maintenance cost and preparation of Standard Operation Procedure (SOP) are developed. For the critical component that has been determined, the Spier component replacement time interval is 228 days with a reliability value of 0,503171, Bushing component is 240 days with reliability value of 0.36861, Bearing component is 202 days with reliability value of 0,503058, Coupling component is 247 days with reliability value of 0,50108 and Roll component is 301 days with reliability value of 0,373525. The results show that the cost decreases from Rp 300,688,114 to Rp 244,384,371 obtained from corrective maintenance to preventive maintenance. While maintenance efficiency increases with the application of preventive maintenance i.e. for Spier component from 54,0540541% to 74,07407%, Bushing component from 52,3809524% to 68,75%, Bearing component from 40% to 52,63158%, Coupling component from 60.9756098% to 71.42857%, and Roll components from 64.516129% to 74.7663551%.

  15. Methods for medical device and equipment procurement and prioritization within low- and middle-income countries: findings of a systematic literature review.

    PubMed

    Diaconu, Karin; Chen, Yen-Fu; Cummins, Carole; Jimenez Moyao, Gabriela; Manaseki-Holland, Semira; Lilford, Richard

    2017-08-18

    Forty to 70 % of medical devices and equipment in low- and middle-income countries are broken, unused or unfit for purpose; this impairs service delivery to patients and results in lost resources. Undiscerning procurement processes are at the heart of this issue. We conducted a systematic review of the literature to August 2013 with no time or language restrictions to identify what product selection or prioritization methods are recommended or used for medical device and equipment procurement planning within low- and middle-income countries. We explore the factors/evidence-base proposed for consideration within such methods and identify prioritization criteria. We included 217 documents (corresponding to 250 texts) in the narrative synthesis. Of these 111 featured in the meta-summary. We identify experience and needs-based methods used to reach procurement decisions. Equipment costs (including maintenance) and health needs are the dominant issues considered. Extracted data suggest that procurement officials should prioritize devices with low- and middle-income country appropriate technical specifications - i.e. devices and equipment that can be used given available human resources, infrastructure and maintenance capacity. Suboptimal device use is directly linked to incomplete costing and inadequate consideration of maintenance services and user training during procurement planning. Accurate estimation of life-cycle costing and careful consideration of device servicing are of crucial importance.

  16. An end-to-end communications architecture for condition-based maintenance applications

    NASA Astrophysics Data System (ADS)

    Kroculick, Joseph

    2014-06-01

    This paper explores challenges in implementing an end-to-end communications architecture for Condition-Based Maintenance Plus (CBM+) data transmission which aligns with the Army's Network Modernization Strategy. The Army's Network Modernization strategy is based on rolling out network capabilities which connect the smallest unit and Soldier level to enterprise systems. CBM+ is a continuous improvement initiative over the life cycle of a weapon system or equipment to improve the reliability and maintenance effectiveness of Department of Defense (DoD) systems. CBM+ depends on the collection, processing and transport of large volumes of data. An important capability that enables CBM+ is an end-to-end network architecture that enables data to be uploaded from the platform at the tactical level to enterprise data analysis tools. To connect end-to-end maintenance processes in the Army's supply chain, a CBM+ network capability can be developed from available network capabilities.

  17. Sensitive maintenance: a cognitive process underlying individual differences in memory for threatening information.

    PubMed

    Peters, Jan H; Hock, Michael; Krohne, Heinz Walter

    2012-01-01

    Dispositional styles of coping with threat influence memory for threatening information. In particular, sensitizers excel over repressors in their memory for threatening information after long retention intervals, but not after short ones. We therefore suggested that sensitizers, but not repressors, employ active maintenance processes during the retention interval to selectively retain threatening material. Sensitive maintenance was studied in 2 experiments in which participants were briefly exposed to threatening and nonthreatening pictures (Experiment 1, N = 128) or words (Experiment 2, N = 145). Following, we administered unannounced recognition tests before and after an intervening task that generated either high or low cognitive load, assuming that high cognitive load would impede sensitizers' memory maintenance of threatening material. Supporting our hypotheses, the same pattern of results was obtained in both experiments: Under low cognitive load, sensitizers forgot less threat material than repressors did; no such differences were observed under high cognitive load.

  18. BIM authoring for an image-based bridge maintenance system of existing cable-supported bridges

    NASA Astrophysics Data System (ADS)

    Dang, N. S.; Shim, C. S.

    2018-04-01

    Infrastructure nowadays is increasingly become the main backbone for the metropolitan development in general. Along with the rise of new facilities, the demand in term of maintenance for the existing bridges is indispensable. Recently, the terminology of “preventive maintenance” is not unfamiliar with the engineer, literally is the use of a bridge maintenance system (BMS) based on a BIM-oriented model. In this paper, the process of generating a BMS based on BIM model is introduced in detail. Data management for this BMS is separated into two modules: site inspection system and information management system. The noteworthy aspect of this model lays on the closed and automatic process of “capture image, generate the technical damage report, and upload/feedback to the BMS” in real-time. A pilot BMS system for a cable-supported bridge is presented which showed a good performance and potential to further development of preventive maintenance.

  19. Working memory training in older adults: evidence of transfer and maintenance effects.

    PubMed

    Borella, Erika; Carretti, Barbara; Riboldi, Francesco; De Beni, Rossana

    2010-12-01

    Few studies have examined working memory (WM) training-related gains and their transfer and maintenance effects in older adults. This present research investigates the efficacy of a verbal WM training program in adults aged 65-75 years, considering specific training gains on a verbal WM (criterion) task as well as transfer effects on measures of visuospatial WM, short-term memory, inhibition, processing speed, and fluid intelligence. Maintenance of training benefits was evaluated at 8-month follow-up. Trained older adults showed higher performance than did controls on the criterion task and maintained this benefit after 8 months. Substantial general transfer effects were found for the trained group, but not for the control one. Transfer maintenance gains were found at follow-up, but only for fluid intelligence and processing speed tasks. The results are discussed in terms of cognitive plasticity in older adults. (c) 2010 APA, all rights reserved).

  20. On-Line Modal State Monitoring of Slowly Time-Varying Structures

    NASA Technical Reports Server (NTRS)

    Johnson, Erik A.; Bergman, Lawrence A.; Voulgaris, Petros G.

    1997-01-01

    Monitoring the dynamic response of structures is often performed for a variety of reasons. These reasons include condition-based maintenance, health monitoring, performance improvements, and control. In many cases the data analysis that is performed is part of a repetitive decision-making process, and in these cases the development of effective on-line monitoring schemes help to speed the decision-making process and reduce the risk of erroneous decisions. This report investigates the use of spatial modal filters for tracking the dynamics of slowly time-varying linear structures. The report includes an overview of modal filter theory followed by an overview of several structural system identification methods. Included in this discussion and comparison are H-infinity, eigensystem realization, and several time-domain least squares approaches. Finally, a two-stage adaptive on-line monitoring scheme is developed and evaluated.

  1. Consumables data base workbook: Formulation of consumables management models

    NASA Technical Reports Server (NTRS)

    Zamora, M. A.

    1977-01-01

    Activity consumables data specifications and data applications are presented. The data are structured in a series of "Consumable Data Worksheets" for each activity that includes a profile of its operations and the rate of each consumable required to support the given activity. The data worksheets provide for the uniform specification of consumables data, allows for the ready identification of the consumables affected by a given activity, and facilitates the updating process. An activity is defined and the data that must be included in the data worksheets are specified. An example of its use and application is given, i.e. consumables data requirements for the performance of the EVA. The consumables data for the activities currently identified for the shuttle spacecraft are included. The consumables data sources are identified and information to facilitate the maintenance process is detailed.

  2. 7 CFR 1467.11 - Easement and 30-year contract participation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., including the restoration, protection, enhancement, maintenance, and management of wetland and other land..., including the restoration, protection, enhancement, maintenance, and management of wetland and other land...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS WETLANDS...

  3. 7 CFR 1467.11 - Easement and 30-year contract participation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., including the restoration, protection, enhancement, maintenance, and management of wetland and other land..., including the restoration, protection, enhancement, maintenance, and management of wetland and other land...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS WETLANDS...

  4. 78 FR 50026 - Basin Electric Power Cooperative, Inc.: Notice of Intent To Prepare a Supplemental Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... transmission lines, 5 new substations, modifications to 4 existing substations, maintenance access roads... address the construction, operation, and maintenance of Basin Electric's proposed Project. The Project includes construction, operation and maintenance of approximately 275 [[Page 50027

  5. 14 CFR 91.1109 - Aircraft maintenance: Inspection program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Aircraft maintenance: Inspection program... Ownership Operations Program Management § 91.1109 Aircraft maintenance: Inspection program. Each program... conduct of inspections for the particular make and model aircraft, including necessary tests and checks...

  6. 14 CFR 91.1109 - Aircraft maintenance: Inspection program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Aircraft maintenance: Inspection program... Ownership Operations Program Management § 91.1109 Aircraft maintenance: Inspection program. Each program... conduct of inspections for the particular make and model aircraft, including necessary tests and checks...

  7. 14 CFR 91.1109 - Aircraft maintenance: Inspection program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Aircraft maintenance: Inspection program... Ownership Operations Program Management § 91.1109 Aircraft maintenance: Inspection program. Each program... conduct of inspections for the particular make and model aircraft, including necessary tests and checks...

  8. The Chemistry of Swimming Pool Maintenance

    ERIC Educational Resources Information Center

    Salter, Carl; Langhus, David L.

    2007-01-01

    The study of chemistry involved in the maintenance of a swimming pool provides a lot of chemical education to the students, including the demonstration of the importance of pH in water chemistry. The various chemical aspects hidden in the maintenance of the pool are being described.

  9. 14 CFR 91.1433 - CAMP: Maintenance and preventive maintenance training program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1433 CAMP: Maintenance and preventive... each person (including inspection personnel) who determines the adequacy of work done is fully informed...

  10. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  11. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  12. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  13. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  14. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  15. Chargemaster maintenance: think 'spring cleaning' all year round.

    PubMed

    Barton, Shawn; Lancaster, Dani; Bieker, Mike

    2008-11-01

    Steps toward maintaining a standardized chargemaster include: Building a corporate chargemaster maintenance team. Developing a core research function. Designating hospital liaisons. Publishing timely reports on facility compliance. Using system codes to identify charges. Selecting chargemaster maintenance software. Developing a standard chargemaster data repository. Educating staff.

  16. Lunar laser ranging data identification and management

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Activity under the subject grant during the first half of fiscal year 1979 at the University of Texas at Austin is reported. Raw lunar laser ranging data submitted by McDonald Observatory, Fort Davis, Texas and by the Australian Division of National Mapping at Orroral Valley, Australia were processed. This processing includes the filtering of signal events from noise photons, normal point formation, data archive management, and data distribution. System-wide program maintenance and up-grade carried out wherever and whenever necessary. Lunar laser ranging data is being transmitted from Austin to Paris for the extraction of earth rotation information during the EROLD campaign.

  17. Facilitating the openEHR approach - organizational structures for defining high-quality archetypes.

    PubMed

    Kohl, Christian Dominik; Garde, Sebastian; Knaup, Petra

    2008-01-01

    Using openEHR archetypes to establish an electronic patient record promises rapid development and system interoperability by using or adopting existing archetypes. However, internationally accepted, high quality archetypes which enable a comprehensive semantic interoperability require adequate development and maintenance processes. Therefore, structures have to be created involving different health professions. In the following we present a model which facilitates and governs distributed but cooperative development and adoption of archetypes by different professionals including peer reviews. Our model consists of a hierarchical structure of professional committees and descriptions of the archetype development process considering these different committees.

  18. Application of dynamic flux balance analysis to an industrial Escherichia coli fermentation.

    PubMed

    Meadows, Adam L; Karnik, Rahi; Lam, Harry; Forestell, Sean; Snedecor, Brad

    2010-03-01

    We have developed a reactor-scale model of Escherichia coli metabolism and growth in a 1000 L process for the production of a recombinant therapeutic protein. The model consists of two distinct parts: (1) a dynamic, process specific portion that describes the time evolution of 37 process variables of relevance and (2) a flux balance based, 123-reaction metabolic model of E. coli metabolism. This model combines several previously reported modeling approaches including a growth rate-dependent biomass composition, maximum growth rate objective function, and dynamic flux balancing. In addition, we introduce concentration-dependent boundary conditions of transport fluxes, dynamic maintenance demands, and a state-dependent cellular objective. This formulation was able to describe specific runs with high-fidelity over process conditions including rich media, simultaneous acetate and glucose consumption, glucose minimal media, and phosphate depleted media. Furthermore, the model accurately describes the effect of process perturbations--such as glucose overbatching and insufficient aeration--on growth, metabolism, and titer. (c) 2009 Elsevier Inc. All rights reserved.

  19. Infrastructure sensing.

    PubMed

    Soga, Kenichi; Schooling, Jennifer

    2016-08-06

    Design, construction, maintenance and upgrading of civil engineering infrastructure requires fresh thinking to minimize use of materials, energy and labour. This can only be achieved by understanding the performance of the infrastructure, both during its construction and throughout its design life, through innovative monitoring. Advances in sensor systems offer intriguing possibilities to radically alter methods of condition assessment and monitoring of infrastructure. In this paper, it is hypothesized that the future of infrastructure relies on smarter information; the rich information obtained from embedded sensors within infrastructure will act as a catalyst for new design, construction, operation and maintenance processes for integrated infrastructure systems linked directly with user behaviour patterns. Some examples of emerging sensor technologies for infrastructure sensing are given. They include distributed fibre-optics sensors, computer vision, wireless sensor networks, low-power micro-electromechanical systems, energy harvesting and citizens as sensors.

  20. Infrastructure sensing

    PubMed Central

    Soga, Kenichi; Schooling, Jennifer

    2016-01-01

    Design, construction, maintenance and upgrading of civil engineering infrastructure requires fresh thinking to minimize use of materials, energy and labour. This can only be achieved by understanding the performance of the infrastructure, both during its construction and throughout its design life, through innovative monitoring. Advances in sensor systems offer intriguing possibilities to radically alter methods of condition assessment and monitoring of infrastructure. In this paper, it is hypothesized that the future of infrastructure relies on smarter information; the rich information obtained from embedded sensors within infrastructure will act as a catalyst for new design, construction, operation and maintenance processes for integrated infrastructure systems linked directly with user behaviour patterns. Some examples of emerging sensor technologies for infrastructure sensing are given. They include distributed fibre-optics sensors, computer vision, wireless sensor networks, low-power micro-electromechanical systems, energy harvesting and citizens as sensors. PMID:27499845

  1. A Novel Method for Electroplating Ultra-High-Strength Glassy Metals

    NASA Technical Reports Server (NTRS)

    Ramsey, Brian; Engelhaupt, Darell; Six, N. Frank (Technical Monitor)

    2002-01-01

    A novel method for electroplating ultra-high-strength glassy metals, nickel-phosphorous and nickel-cobalt-phosphorous, has been developed at NASA Marshall Space Flight Center, cooperatively with the University of Alabama in Huntsville. Traditionally, thin coatings of these metals are achieved via electroless deposition. Benefits of the new electrolytic process include thick, low-stress deposits, free standing shapes, lower plating temperature, low maintenance, and safer operation with substantially lower cost.

  2. Time for a second look at SOX compliance.

    PubMed

    Bigalke, John T; Burrill, Stephen J

    2007-08-01

    Incentives for tax-exempt healthcare organizations to comply with the Sarbanes-Oxley Act (SOX) abound from many quarters, including government, various associations, and the capital markets. New proposals from the Securities and Exchange Commission and the Public Company Accountability Oversight Board will streamline the processes of SOX compliance, even as the cost of compliance is dropping. Voluntary SOX compliance can best be achieved by adopting a four-phased control rationalization approach to implementation and maintenance.

  3. Crew Health Care System (CHeCS) Design Research, Documentations, and Evaluations

    NASA Technical Reports Server (NTRS)

    CLement, Bethany M.

    2011-01-01

    The Crew Health Care System (CHeCS) is a group within the Space Life Science Directorate (SLSD) that focuses on the overall health of astronauts by reinforcing the three divisions - the Environmental Maintenance System (EMS), the Countermeasures System (CMS), and the Health Maintenance System (HMS). This internship provided opportunity to gain knowledge, experience, and skills in CHeCS engineering and operations tasks. Various and differing tasks allowed for occasions to work independently, network to get things done, and show leadership abilities. Specific exercises included reviewing hardware certification, operations, and documentation within the ongoing Med Kit Redesign (MKR) project, and learning, writing, and working various common pieces of paperwork used in the engineering and design process. Another project focused on the distribution of various pieces of hardware to off-site research facilities with an interest in space flight health care. The main focus of this internship, though, was on a broad and encompassing understanding of the engineering process as time was spent looking at each individual step in a variety of settings and tasks.

  4. Xenopus egg extract: A powerful tool to study genome maintenance mechanisms.

    PubMed

    Hoogenboom, Wouter S; Klein Douwel, Daisy; Knipscheer, Puck

    2017-08-15

    DNA repair pathways are crucial to maintain the integrity of our genome and prevent genetic diseases such as cancer. There are many different types of DNA damage and specific DNA repair mechanisms have evolved to deal with these lesions. In addition to these repair pathways there is an extensive signaling network that regulates processes important for repair, such as cell cycle control and transcription. Despite extensive research, DNA damage repair and signaling are not fully understood. In vitro systems such as the Xenopus egg extract system, have played, and still play, an important role in deciphering the molecular details of these processes. Xenopus laevis egg extracts contain all factors required to efficiently perform DNA repair outside a cell, using mechanisms conserved in humans. These extracts have been used to study several genome maintenance pathways, including mismatch repair, non-homologous end joining, ICL repair, DNA damage checkpoint activation, and replication fork stability. Here we describe how the Xenopus egg extract system, in combination with specifically designed DNA templates, contributed to our detailed understanding of these pathways. Copyright © 2017. Published by Elsevier Inc.

  5. Reusing Information Management Services for Recommended Decadal Study Missions to Facilitate Aerosol and Cloud Studies

    NASA Technical Reports Server (NTRS)

    Kempler, Steve; Alcott, Gary; Lynnes, Chris; Leptoukh, Greg; Vollmer, Bruce; Berrick, Steve

    2008-01-01

    NASA Earth Sciences Division (ESD) has made great investments in the development and maintenance of data management systems and information technologies, to maximize the use of NASA generated Earth science data. With information management system infrastructure in place, mature and operational, very small delta costs are required to fully support data archival, processing, and data support services required by the recommended Decadal Study missions. This presentation describes the services and capabilities of the Goddard Space Flight Center (GSFC) Earth Sciences Data and Information Services Center (GES DISC) and the reusability for these future missions. The GES DISC has developed a series of modular, reusable data management components currently in use. They include data archive and distribution (Simple, Scalable, Script-based, Science [S4] Product Archive aka S4PA), data processing (S4 Processor for Measurements aka S4PM), data search (Mirador), data browse, visualization, and analysis (Giovanni), and data mining services. Information management system components are based on atmospheric scientist inputs. Large development and maintenance cost savings can be realized through their reuse in future missions.

  6. Construction and maintenance of the Ganges-Brahmaputra-Meghna delta: linking process, morphology, and stratigraphy.

    PubMed

    Wilson, Carol A; Goodbred, Steven L

    2015-01-01

    We present a review of the processes, morphology, and stratigraphy of the Ganges-Brahmaputra-Meghna delta (GBMD), including insights gained from detailed elevation data. The review shows that the GBMD is best characterized as a composite system, with different regions having morphologic and stratigraphic attributes of an upland fluvial fan delta; a lowland, backwater-reach delta; a downdrift tidal delta plain; and an offshore subaqueous-delta clinoform. These distinct areas of upland and lowland fluvial reaches and tidal dominance vary in time and space, and we distinguish late-Holocene phases of delta construction, maintenance, and decline similar to delta-lobe cycling in other systems. The overall stability of the GBMD landform, relative to many deltas, reflects the efficient, widespread dispersal of sediment by the large monsoon discharge and high-energy tides that affect this region. However, we do identify portions of the delta that are in decline and losing elevation relative to sea level owing to insufficient sediment delivery. These areas, some of which are well inland of the coast, represent those most at risk to the continued effect of sea-level rise.

  7. Real-time digital data-acquisition system for determining load characteristics. Volume 2: Operating, programming and maintenance instructions

    NASA Astrophysics Data System (ADS)

    Podesto, B.; Lapointe, A.; Larose, G.; Robichaud, Y.; Vaillancourt, C.

    1981-03-01

    The design and construction of a Real-Time Digital Data Acquisition System (RTDDAS) to be used in substations for on-site recording and preprocessing load response data were included. The gathered data can be partially processed on site to compute the apparent, active and reactive powers, voltage and current rms values, and instantaneous values of phase voltages and currents. On-site processing capability is provided for rapid monitoring of the field data to ensure that the test setup is suitable. Production analysis of field data is accomplished off-line on a central computer from data recorded on a dual-density (800/1600) magnetic tape which is IBM-compatible. Parallel channels of data can be recorded at a variable rate from 480 to 9000 samples per second per channel. The RTDDAS is housed in a 9.1 m (30-ft) trailer which is shielded from electromagnetic interference and protected by isolators from switching surges. The test must sometimes be performed. Information pertaining to the installation, software operation, and maintenance is presented.

  8. KC-46 Workforce Requirements for Depot Maintenance Activation

    DTIC Science & Technology

    2014-03-27

    commercial derivative aircraft . These are aircraft originally designed for commercial aviation but with modifications that change the aircraft to fit the... designing the process to capture the data needed to infer answers to the research questions. More needs to be understood about how aircraft maintenance...Air Force projects receiving new KC-46 aircraft in 2016 and headquarters is directing organic maintenance. Oklahoma City ALC is the depot projected

  9. Performance Evaluation of the UT Automated Road Maintenance Machine

    DOT National Transportation Integrated Search

    1997-10-01

    This final report focuses mainly on evaluating the overall performance of The University of Texas' Automated Road Maintenance Machine (ARMM). It was concluded that the introduction of automated methods to the pavement crack-sealing process will impro...

  10. ASDC Tools Temporarily Unavailable

    Atmospheric Science Data Center

    2015-12-21

    ... The ASDC will be conducting maintenance due to an unexpected power outage. The Data Pool, MISR order and browse tools, TAD, TES and ... may be unavailable during maintenance. Data processing and distribution may be impacted and systems are expected to return to normal ...

  11. 5 CFR 293.101 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL RECORDS Basic Policies on Maintenance of Personnel Records § 293.101 Purpose and scope. (a) This subpart sets forth basic policies governing the creation, development, maintenance, processing, use...

  12. Strategies for Improving Maintenance and Generalization of Academic Skills--So Students "Don't Leave Class without It."

    ERIC Educational Resources Information Center

    Gable, Robert A.; And Others

    1992-01-01

    An instructional process for facilitating maintenance and generalization of academic skills is presented, using the ABCD'S (Antecedent Events, Behavior, Consequent Events, Data, and Setting Events) Generalization Intervention Model. (JDD)

  13. The impact of cultural differences in self-representation on the neural substrates of posttraumatic stress disorder

    PubMed Central

    Liddell, Belinda J.; Jobson, Laura

    2016-01-01

    A significant body of literature documents the neural mechanisms involved in the development and maintenance of posttraumatic stress disorder (PTSD). However, there is very little empirical work considering the influence of culture on these underlying mechanisms. Accumulating cultural neuroscience research clearly indicates that cultural differences in self-representation modulate many of the same neural processes proposed to be aberrant in PTSD. The objective of this review paper is to consider how culture may impact on the neural mechanisms underlying PTSD. We first outline five key affective and cognitive functions and their underlying neural correlates that have been identified as being disrupted in PTSD: (1) fear dysregulation; (2) attentional biases to threat; (3) emotion and autobiographical memory; (4) self-referential processing; and (5) attachment and interpersonal processing. Second, we consider prominent cultural theories and review the empirical research that has demonstrated the influence of cultural variations in self-representation on the neural substrates of these same five affective and cognitive functions. Finally, we propose a conceptual model that suggests that these five processes have major relevance to considering how culture may influence the neural processes underpinning PTSD. Highlights of the article Cultural variations in individualistic-collectivistic self-representation modulate many of the same neural and psychological processes disrupted in PTSD. These commonly affected processes include fear perception and regulation mechanisms, attentional biases (to threat), emotional and autobiographical memory systems, self-referential processing and attachment systems. A conceptual model is proposed whereby culture is considered integral to the development and maintenance of PTSD and its neural substrates. PMID:27302635

  14. Power plant maintenance scheduling using ant colony optimization: an improved formulation

    NASA Astrophysics Data System (ADS)

    Foong, Wai Kuan; Maier, Holger; Simpson, Angus

    2008-04-01

    It is common practice in the hydropower industry to either shorten the maintenance duration or to postpone maintenance tasks in a hydropower system when there is expected unserved energy based on current water storage levels and forecast storage inflows. It is therefore essential that a maintenance scheduling optimizer can incorporate the options of shortening the maintenance duration and/or deferring maintenance tasks in the search for practical maintenance schedules. In this article, an improved ant colony optimization-power plant maintenance scheduling optimization (ACO-PPMSO) formulation that considers such options in the optimization process is introduced. As a result, both the optimum commencement time and the optimum outage duration are determined for each of the maintenance tasks that need to be scheduled. In addition, a local search strategy is presented in this article to boost the robustness of the algorithm. When tested on a five-station hydropower system problem, the improved formulation is shown to be capable of allowing shortening of maintenance duration in the event of expected demand shortfalls. In addition, the new local search strategy is also shown to have significantly improved the optimization ability of the ACO-PPMSO algorithm.

  15. Bringing the Adult Learning Experience of Successful Weight Loss Maintenance into Focus: A Narrative Analysis with Implications for Educators and Clinicians

    ERIC Educational Resources Information Center

    Stametz, Rebecca A.

    2013-01-01

    In light of the many social, medical, and political viewpoints on obesity, little is known of the weight loss maintenance experience and the impact on learning processes and outcomes among adults. The purpose of this study was two-fold: a) to explore the experience and meaning-making processes of individuals who have maintained a weight loss and…

  16. Targeting mitochondrial function and proteostasis to mitigate dynapenia.

    PubMed

    Musci, Robert V; Hamilton, Karyn L; Miller, Benjamin F

    2018-01-01

    Traditionally, interventions to treat skeletal muscle aging have largely targeted sarcopenia-the age-related loss of skeletal muscle mass. Dynapenia refers to the age-related loss in skeletal muscle function due to factors outside of muscle mass, which helps to inform treatment strategies for aging skeletal muscle. There is evidence that mechanisms to maintain protein homeostasis and proteostasis, deteriorate with age. One key mechanism to maintain proteostasis is protein turnover, which is an energetically costly process. When there is a mismatch between cellular energy demands and energy provision, inelastic processes related to metabolism are maintained, but there is competition for the remaining energy between the elastic processes of somatic maintenance and growth. With aging, mitochondrial dysfunction reduces ATP generation capacity, constraining the instantaneous supply of energy, thus compromising growth and somatic maintenance processes. Further, with age the need for somatic maintenance increases because of the accumulation of protein damage. In this review, we highlight the significant role mitochondria have in maintaining skeletal muscle proteostasis through increased energy provision, protein turnover, and substrate flux. In addition, we provide evidence that improving mitochondrial function could promote a cellular environment that is conducive to somatic maintenance, and consequently for mitigating dynapenia. Finally, we highlight interventions, such as aerobic exercise, that could be used to improve mitochondrial function and improve outcomes related to dynapenia.

  17. 40 CFR 1039.125 - What maintenance instructions must I give to buyers?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... maintaining and using the engine, including the emission-control system. The maintenance instructions also...,000 hours: Fuel injectors, turbochargers, catalytic converters, electronic control units, EGR systems..., catalytic converters, electronic control units, EGR systems (including related components, but excluding...

  18. 40 CFR 1039.125 - What maintenance instructions must I give to buyers?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... maintaining and using the engine, including the emission-control system. The maintenance instructions also...,000 hours: Fuel injectors, turbochargers, catalytic converters, electronic control units, EGR systems..., catalytic converters, electronic control units, EGR systems (including related components, but excluding...

  19. 40 CFR 1039.125 - What maintenance instructions must I give to buyers?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... maintaining and using the engine, including the emission-control system. The maintenance instructions also...,000 hours: Fuel injectors, turbochargers, catalytic converters, electronic control units, EGR systems..., catalytic converters, electronic control units, EGR systems (including related components, but excluding...

  20. 40 CFR 1039.125 - What maintenance instructions must I give to buyers?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... maintaining and using the engine, including the emission-control system. The maintenance instructions also...,000 hours: Fuel injectors, turbochargers, catalytic converters, electronic control units, EGR systems..., catalytic converters, electronic control units, EGR systems (including related components, but excluding...

  1. How to Cut Landscape Maintenance Costs.

    ERIC Educational Resources Information Center

    Brickman, Dick

    1982-01-01

    A landscape architect explains how maintenance requirements and costs are affected by landscape design, the physical demands of the site, and the relative use of grass, ground cover, shrubs, and trees. The relationship of these factors to initial and ongoing maintenance costs, including staff requirements, is discussed. (MLF)

  2. 50 CFR 17.43 - Special rules-amphibians.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... outbuildings; (viii) Repair and maintenance of unimproved ranch roads (This exemption does not include... of section 9 of the Act, if the take results from livestock use at or maintenance activities of... using discing and grading to destroy burrows and fill openings; (iv) Routine management and maintenance...

  3. 14 CFR Appendix G to Part 23 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Pt. 23, App... maintenance manual or section. (1) Introduction information that includes an explanation of the airplane's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  4. 77 FR 60323 - Airworthiness Directives; DASSUALT AVIATION Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... 50 (MF50) type design are included in Dassault Aviation Myst[egrave]re-Falcon 50 Aircraft Maintenance.... Compliance with this check is required by EASA AD 2010-0080. The maintenance tasks and airworthiness... manufacturer revision to the airplane maintenance manual (AMM) that introduces new or more restrictive...

  5. 14 CFR Appendix G to Part 23 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Pt. 23, App... maintenance manual or section. (1) Introduction information that includes an explanation of the airplane's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  6. 14 CFR Appendix G to Part 23 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Pt. 23, App... maintenance manual or section. (1) Introduction information that includes an explanation of the airplane's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  7. 14 CFR Appendix G to Part 23 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Pt. 23, App... maintenance manual or section. (1) Introduction information that includes an explanation of the airplane's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  8. 78 FR 58973 - Airworthiness Directives; Dassault Aviation Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ... 2000EX type design are included in Dassault Aviation Falcon 2000EX (F2000EX) Aircraft Maintenance Manual... numbers. (d) Subject Air Transport Association (ATA) of America Code 05, Time Limits/ Maintenance Checks... to introduce a corrosion prevention control program, among other changes, to the maintenance...

  9. 14 CFR Appendix G to Part 23 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Pt. 23, App... maintenance manual or section. (1) Introduction information that includes an explanation of the airplane's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  10. Highway Maintenance Equipment Operator. Miscellaneous Equipment. Training Materials.

    ERIC Educational Resources Information Center

    Perky, Sandra Dutreau; And Others

    This curriculum guide provides instructional materials to assist in training equipment operators in the safe and effective use of highway maintenance equipment. It includes six units of instruction covering the small, specialized equipment used in maintenance operations. Each unit of instruction consists of eight basic components: performance…

  11. The Politics of Budgeting for Deferred Maintenance.

    ERIC Educational Resources Information Center

    Saunders, Laura E.

    1989-01-01

    The University of Washington has addressed its deferred maintenance needs through a strategy that includes building an externally reinforced consensus, internal monitoring, a review and priority-setting system, and a conscious budget strategy that separates needs for deferred maintenance from projects that serve teaching and research directly.…

  12. The Application of the Human Engineering Modeling and Performance Laboratory for Space Vehicle Ground Processing Tasks at Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Woodbury, Sarah K.

    2008-01-01

    The introduction of United Space Alliance's Human Engineering Modeling and Performance Laboratory began in early 2007 in an attempt to address the problematic workspace design issues that the Space Shuttle has imposed on technicians performing maintenance and inspection operations. The Space Shuttle was not expected to require the extensive maintenance it undergoes between flights. As a result, extensive, costly resources have been expended on workarounds and modifications to accommodate ground processing personnel. Consideration of basic human factors principles for design of maintenance is essential during the design phase of future space vehicles, facilities, and equipment. Simulation will be needed to test and validate designs before implementation.

  13. ENERGY SYSTEM DEVELOPMENT AND LOAD MANAGEMENT THROUGH THE REHABILITATION AND RETURN TO PLAY PROCESS.

    PubMed

    Morrison, Scot; Ward, Patrick; duManoir, Gregory R

    2017-08-01

    Return-to-play from injury is a complex process involving many factors including the balancing of tissue healing rates with the development of biomotor abilities. This process requires interprofessional cooperation to ensure success. An often-overlooked aspect of return-to-play is the development and maintenance of sports specific conditioning while monitoring training load to ensure that the athlete's training stimulus over the rehabilitation period is appropriate to facilitate a successful return to play. The purpose of this clinical commentary is to address the role of energy systems training as part of the return-to-play process. Additionally the aim is to provide practitioners with an overview of practical sports conditioning training methods and monitoring strategies to allow them to direct and quantify the return-to-play process. 5.

  14. KSC-08pd0431

    NASA Image and Video Library

    2008-02-20

    KENNEDY SPACE CENTER, FLA. -- Space shuttle Atlantis is towed into the Orbiter Processing Facility, or OPF, where processing Atlantis for another flight will take place. After a round trip of nearly 5.3 million miles, Atlantis and crew returned to Earth with a landing at 9:07 a.m. EST to complete the STS-122 mission. Towing normally begins within four hours after landing and is completed within six hours unless removal of time-sensitive experiments is required on the runway. In the OPF, turnaround processing procedures on Atlantis will include various post-flight deservicing and maintenance functions, which are carried out in parallel with payload removal and the installation of equipment needed for the next mission. Photo credit: NASA/Jack Pfaller

  15. KSC-08pd0430

    NASA Image and Video Library

    2008-02-20

    KENNEDY SPACE CENTER, FLA. -- Space shuttle Atlantis is towed toward the Orbiter Processing Facility, or OPF, where processing Atlantis for another flight will take place. After a round trip of nearly 5.3 million miles, Atlantis and crew returned to Earth with a landing at 9:07 a.m. EST to complete the STS-122 mission. Towing normally begins within four hours after landing and is completed within six hours unless removal of time-sensitive experiments is required on the runway. In the OPF, turnaround processing procedures on Atlantis will include various post-flight deservicing and maintenance functions, which are carried out in parallel with payload removal and the installation of equipment needed for the next mission. Photo credit: NASA/Jack Pfaller

  16. Mechanisms of deterioration of nutrients. [retention of flavor during freeze drying

    NASA Technical Reports Server (NTRS)

    Karel, M.; Flink, J. M.

    1975-01-01

    The retention of flavor during freeze drying was studied with model systems. Mechanisms by which flavor retention phenomena is explained were developed and process conditions specified so that flavor retention is optimized. The literature is reviewed and results of studies of the flavor retention behavior of a number of real food products, including both liquid and solid foods are evaluated. Process parameters predicted by the mechanisms to be of greatest significance are freezing rate, initial solids content, and conditions which result in maintenance of sample structure. Flavor quality for the real food showed the same behavior relative to process conditions as predicted by the mechanisms based on model system studies.

  17. A cost analysis comparing xeroradiography to film technics for intraoral radiography.

    PubMed

    Gratt, B M; Sickles, E A

    1986-01-01

    In the United States during 1978 $730 million was spent on dental radiographic services. Currently there are three alternatives for the processing of intraoral radiographs: manual wet-tanks, automatic film units, or xeroradiography. It was the intent of this study to determine which processing system is the most economical. Cost estimates were based on a usage rate of 750 patient images per month and included a calculation of the average cost per radiograph over a five-year period. Capital costs included initial processing equipment and site preparation. Operational costs included labor, supplies, utilities, darkroom rental, and breakdown costs. Clinical time trials were employed to measure examination times. Maintenance logs were employed to assess labor costs. Indirect costs of training were estimated. Results indicated that xeroradiography was the most cost effective ($0.81 per image) compared to either automatic film processing ($1.14 per image) or manual processing ($1.35 per image). Variations in projected costs indicated that if a dental practice performs primarily complete-mouth surveys, exposes less than 120 radiographs per month, and pays less than +6.50 per hour in wages, then manual (wet-tank) processing is the most economical method for producing intraoral radiographs.

  18. 25 CFR 900.70 - What elements are included in the compensation for a lease entered into between the Secretary and...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... interest paid or accrued; (e) Operation and maintenance expenses, to the extent not otherwise included in...) Monitoring and preventive maintenance of building structures and systems, including but not limited to: (i) Heating/ventilation/air conditioning; (ii) Plumbing; (iii) Electrical; (iv) Elevators; (v) Boilers; (vi...

  19. 25 CFR 900.70 - What elements are included in the compensation for a lease entered into between the Secretary and...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... interest paid or accrued; (e) Operation and maintenance expenses, to the extent not otherwise included in...) Monitoring and preventive maintenance of building structures and systems, including but not limited to: (i) Heating/ventilation/air conditioning; (ii) Plumbing; (iii) Electrical; (iv) Elevators; (v) Boilers; (vi...

  20. 25 CFR 900.70 - What elements are included in the compensation for a lease entered into between the Secretary and...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... interest paid or accrued; (e) Operation and maintenance expenses, to the extent not otherwise included in...) Monitoring and preventive maintenance of building structures and systems, including but not limited to: (i) Heating/ventilation/air conditioning; (ii) Plumbing; (iii) Electrical; (iv) Elevators; (v) Boilers; (vi...

  1. 25 CFR 900.70 - What elements are included in the compensation for a lease entered into between the Secretary and...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... interest paid or accrued; (e) Operation and maintenance expenses, to the extent not otherwise included in...) Monitoring and preventive maintenance of building structures and systems, including but not limited to: (i) Heating/ventilation/air conditioning; (ii) Plumbing; (iii) Electrical; (iv) Elevators; (v) Boilers; (vi...

  2. RTEL1: an essential helicase for telomere maintenance and the regulation of homologous recombination.

    PubMed

    Uringa, Evert-Jan; Youds, Jillian L; Lisaingo, Kathleen; Lansdorp, Peter M; Boulton, Simon J

    2011-03-01

    Telomere maintenance and DNA repair are crucial processes that protect the genome against instability. RTEL1, an essential iron-sulfur cluster-containing helicase, is a dominant factor that controls telomere length in mice and is required for telomere integrity. In addition, RTEL1 promotes synthesis-dependent strand annealing to direct DNA double-strand breaks into non-crossover outcomes during mitotic repair and in meiosis. Here, we review the role of RTEL1 in telomere maintenance and homologous recombination and discuss models linking RTEL1's enzymatic activity to its function in telomere maintenance and DNA repair.

  3. Highway Maintenance Equipment Operator. Specialized Equipment. Training Materials.

    ERIC Educational Resources Information Center

    Perky, Sandra Dutreau; And Others

    This curriculum guide provides instructional materials to assist in training equipment operators in the safe and effective use of highway maintenance equipment. It includes 18 units of instruction covering the large equipment used in maintenance operations. Each unit of instruction consists of eight basic components: performance objectives,…

  4. 77 FR 68076 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Redesignation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-15

    ... redesignation. The maintenance plan includes an insignificance determination for the on-road motor vehicle... and Approval of the Associated Maintenance Plan AGENCY: Environmental Protection Agency (EPA). ACTION... proposing to approve the maintenance plan SIP revision that the State submitted in conjunction with its...

  5. 14 CFR Appendix A to Part 35 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS Pt. 35, App. A Appendix A to Part 35—Instructions for... Maintenance Section. (1) Introduction information that includes an explanation of the propeller's features and data to the extent necessary for maintenance or preventive maintenance. (2) A detailed description of...

  6. 14 CFR Appendix A to Part 29 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Pt. 29, App. A Appendix A to Part 29... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  7. 14 CFR Appendix A to Part 35 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS Pt. 35, App. A Appendix A to Part 35—Instructions for... Maintenance Section. (1) Introduction information that includes an explanation of the propeller's features and data to the extent necessary for maintenance or preventive maintenance. (2) A detailed description of...

  8. 14 CFR Appendix A to Part 27 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Pt. 27, App. A Appendix A to Part 27... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  9. 76 FR 19716 - Airworthiness Directives; BAE SYSTEMS (Operations) Limited Model 4101 Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... Jetstream J41 Aircraft Maintenance Manual (AMM), includes the following chapters: --05-10-10 ``Airworthiness... Jetstream Series 4100 Aircraft Maintenance Manual, Revision 33, dated February 15, 2010. The actions...: * * * BAE Systems (Operations) Ltd has issued Revision 33 of the AMM [airplane maintenance manual] to amend...

  10. 14 CFR Appendix A to Part 27 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Pt. 27, App. A Appendix A to Part 27... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  11. 14 CFR Appendix A to Part 27 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Pt. 27, App. A Appendix A to Part 27... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  12. 14 CFR Appendix A to Part 29 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Pt. 29, App. A Appendix A to Part 29... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  13. 14 CFR Appendix A to Part 35 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS Pt. 35, App. A Appendix A to Part 35—Instructions for... Maintenance Section. (1) Introduction information that includes an explanation of the propeller's features and data to the extent necessary for maintenance or preventive maintenance. (2) A detailed description of...

  14. 14 CFR Appendix A to Part 29 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Pt. 29, App. A Appendix A to Part 29... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  15. 76 FR 73477 - Airworthiness Directives; BAE SYSTEMS (Operations) Limited Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... of the AMM [aircraft maintenance manual] to introduce a new hydraulic filter assembly life limit and...: The BAe 146/AVRO 146-RJ Aircraft Maintenance Manual (AMM) includes chapters 05-10 ``Time Limits'', 05...'' and 05-20 ``Scheduled Maintenance Checks'', some sub-chapters of which have been identified as...

  16. 14 CFR Appendix A to Part 27 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Pt. 27, App. A Appendix A to Part 27... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  17. 14 CFR Appendix A to Part 35 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS Pt. 35, App. A Appendix A to Part 35—Instructions for... Maintenance Section. (1) Introduction information that includes an explanation of the propeller's features and data to the extent necessary for maintenance or preventive maintenance. (2) A detailed description of...

  18. 14 CFR Appendix A to Part 35 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS Pt. 35, App. A Appendix A to Part 35—Instructions for... Maintenance Section. (1) Introduction information that includes an explanation of the propeller's features and data to the extent necessary for maintenance or preventive maintenance. (2) A detailed description of...

  19. 14 CFR Appendix A to Part 29 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Pt. 29, App. A Appendix A to Part 29... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  20. 14 CFR Appendix A to Part 29 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Pt. 29, App. A Appendix A to Part 29... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  1. 14 CFR Appendix A to Part 27 - Instructions for Continued Airworthiness

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Pt. 27, App. A Appendix A to Part 27... maintenance manual or section. (1) Introduction information that includes an explanation of the rotorcraft's features and data to the extent necessary for maintenance or preventive maintenance. (2) A description of...

  2. 30 CFR 48.22 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... surface mine, including any delivery, office, or scientific worker or occasional, short-term maintenance... construction, or who is regularly exposed to mine hazards, or who is a maintenance or service worker employed by the operator or a maintenance or service worker contracted by the operator to work at the mine for...

  3. 30 CFR 48.22 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... surface mine, including any delivery, office, or scientific worker or occasional, short-term maintenance... construction, or who is regularly exposed to mine hazards, or who is a maintenance or service worker employed by the operator or a maintenance or service worker contracted by the operator to work at the mine for...

  4. 30 CFR 48.22 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... surface mine, including any delivery, office, or scientific worker or occasional, short-term maintenance... construction, or who is regularly exposed to mine hazards, or who is a maintenance or service worker employed by the operator or a maintenance or service worker contracted by the operator to work at the mine for...

  5. 30 CFR 48.22 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... surface mine, including any delivery, office, or scientific worker or occasional, short-term maintenance... construction, or who is regularly exposed to mine hazards, or who is a maintenance or service worker employed by the operator or a maintenance or service worker contracted by the operator to work at the mine for...

  6. 78 FR 42805 - HarperCollins Publishers Distribution Operations Including On-Site Leased Workers From Action...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-17

    ... Staffing, Kelly Services, Manpower, Canteen, Bulldog Maintenance Company, Inc., Action Lift, and Krayer.... The state reports that workers leased from Canteen, Bulldog Maintenance Company, Inc., Action Lift..., Bulldog Maintenance Company, Inc., Action Lift, Krayer Detective Agency, D's Packaging and Rennobs. The...

  7. Financial Reporting at the Washington Headquarters Services

    DTIC Science & Technology

    2001-03-15

    This report is the third, and last, in this series addressing the underlying financial reporting processes that cause abnormal balances on the trial...Forces, the Pentagon Reservation Maintenance Revolving Fund, and the Building Maintenance Fund. Preceding reports addressed financial reporting by the

  8. Work Flow Analysis Report Consisting of Work Management - Preventive Maintenance - Materials and Equipment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JENNINGS, T.L.

    The Work Flow analysis Report will be used to facilitate the requirements for implementing the Work Control module of Passport. The report consists of workflow integration processes for Work Management, Preventative Maintenance, Materials and Equipment

  9. 5 CFR 293.103 - Recordkeeping standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 293.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL RECORDS Basic Policies on Maintenance of Personnel Records § 293.103 Recordkeeping standards. (a) The head..., processing, use, or maintenance of personnel records are informed of pertinent recordkeeping regulations and...

  10. An evaluation of winter maintenance material metering and placement equipment : final report.

    DOT National Transportation Integrated Search

    1999-08-01

    Beginning in January, 1997, an evaluation process was undertaken by the Maine Department of : Transportation (MDOT) in an effort to determine if developing technologies in the winter : maintenance field might be viable and cost effective additions to...

  11. Fatigue in aerostructures--where structural health monitoring can contribute to a complex subject.

    PubMed

    Boller, Christian; Buderath, Matthias

    2007-02-15

    An overview of the aircraft design and maintenance process is given with specific emphasis on the fatigue design as well as the phenomenon of the ageing aircraft observed over the life cycle. The different measures taken to guarantee structural integrity along the maintenance process are addressed. The impact of structural health monitoring as a means of possibly revolutionizing the current aircraft structural monitoring and design process is emphasized and comparison is made to jet engines and helicopters, where health monitoring has already found the respective breakthrough.

  12. Analysis of microbiota involved in the aged natural fermentation of indigo.

    PubMed

    Okamoto, Takahiro; Aino, Kenichi; Narihiro, Takashi; Matsuyama, Hidetoshi; Yumoto, Isao

    2017-04-01

    Although the indigo reduction process is performed via natural fermentation and maintained under open-air condition, the indigo-reducing reactions continue for 6 months (on average) or longer. Identifying the mechanism underlying the maintenance of this process could lead to the development of a novel, long-lasting, unsterilized bioprocesses. To determine the mechanisms underlying the maintenance of the indigo fermentation system microbiota for more than 6 months in a reduced state in an anaerobic alkaline environment, we examined changes in the microbiota in one early-phase batch and two aged batches of indigo fermentation fluid. The microbiota in the aged fermentation fluid consisted mainly of the genera Alkalibacterium, Amphibacillus, Anaerobacillus and Polygonibacillus and the family Proteinivoraceae. The genera Alkalibacterium, Amphibacillus and Polygonibacillus are known to include indigo-reducing bacteria. Although the transition speed was slower in the aged fermentation fluid than in the early-stage fluid, the microbiota in the aged fermentation fluid maintained for more than 6 months was drastically changed within a period of 3 months. The results of this study indicate that the bacterial consortia consisted of various indigo-reducing species that replace the previous group of indigo-reducing bacteria. The notable transitional changes may be concomitant with changes in the environmental conditions, such as the nutritional conditions, observed over 3 months. This flexibility may lead to important changes in the microbiota that allow for the maintenance of a fermentation-reducing state over a long period.

  13. 76 FR 16447 - Lafarge North America, Inc., a Subsidiary of Lafarge, Including On-Site Leased Workers From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... that workers leased from Industrial Services, Incorporated and Summit Building Maintenance were... leased workers from Industrial Services, Incorporated and Summit Building Maintenance, Seattle..., Inc., a Subsidiary of Lafarge, Including On-Site Leased Workers From Industrial Services, Incorporated...

  14. 78 FR 45052 - Critical Parts for Airplane Propellers; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ..., early warning devices, maintenance checks, and other similar equipment or procedures. If items of the..., and maintenance processes for propeller critical parts. An unintentional error was introduced in Sec... transportation, Aircraft, Aviation safety, Safety. The Correcting Amendment In consideration of the foregoing...

  15. 5 CFR 293.108 - Rules of conduct.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL RECORDS Basic Policies on Maintenance of Personnel Records § 293.108 Rules of conduct. (a) Scope. These rules of conduct apply to all Office and agency employees responsible for creation, development, maintenance, processing...

  16. Industrial Maintenance. Ohio's Competency Analysis Profile.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. Vocational Instructional Materials Lab.

    Developed through a modified DACUM (Developing a Curriculum) process involving business, industry, labor, and community agency representatives in Ohio, this document is a comprehensive and verified employer competency profile for industrial maintenance occupations. The list contains units (with and without subunits), competencies, and competency…

  17. Effects of load and maintenance duration on the time course of information encoding and retrieval in working memory: from perceptual analysis to post-categorization processes.

    PubMed

    Pinal, Diego; Zurrón, Montserrat; Díaz, Fernando

    2014-01-01

    information encoding, maintenance, and retrieval; these are supported by brain activity in a network of frontal, parietal and temporal regions. Manipulation of WM load and duration of the maintenance period can modulate this activity. Although such modulations have been widely studied using the event-related potentials (ERP) technique, a precise description of the time course of brain activity during encoding and retrieval is still required. Here, we used this technique and principal component analysis to assess the time course of brain activity during encoding and retrieval in a delayed match to sample task. We also investigated the effects of memory load and duration of the maintenance period on ERP activity. Brain activity was similar during information encoding and retrieval and comprised six temporal factors, which closely matched the latency and scalp distribution of some ERP components: P1, N1, P2, N2, P300, and a slow wave. Changes in memory load modulated task performance and yielded variations in frontal lobe activation. Moreover, the P300 amplitude was smaller in the high than in the low load condition during encoding and retrieval. Conversely, the slow wave amplitude was higher in the high than in the low load condition during encoding, and the same was true for the N2 amplitude during retrieval. Thus, during encoding, memory load appears to modulate the processing resources for context updating and post-categorization processes, and during retrieval it modulates resources for stimulus classification and context updating. Besides, despite the lack of differences in task performance related to duration of the maintenance period, larger N2 amplitude and stronger activation of the left temporal lobe after long than after short maintenance periods were found during information retrieval. Thus, results regarding the duration of maintenance period were complex, and future work is required to test the time-based decay theory predictions.

  18. Working memory still needs verbal rehearsal.

    PubMed

    Lucidi, Annalisa; Langerock, Naomi; Hoareau, Violette; Lemaire, Benoît; Camos, Valérie; Barrouillet, Pierre

    2016-02-01

    The causal role of verbal rehearsal in working memory has recently been called into question. For example, the SOB-CS (Serial Order in a Box-Complex Span) model assumes that there is no maintenance process for the strengthening of items in working memory, but instead a process of removal of distractors that are involuntarily encoded and create interference with memory items. In the present study, we tested the idea that verbal working memory performance can be accounted for without assuming a causal role of the verbal rehearsal process. We demonstrate in two experiments using a complex span task and a Brown-Peterson paradigm that increasing the number of repetitions of the same distractor (the syllable ba that was read aloud at each of its occurrences on screen) has a detrimental effect on the concurrent maintenance of consonants whereas the maintenance of spatial locations remains unaffected. A detailed analysis of the tasks demonstrates that accounting for this effect within the SOB-CS model requires a series of unwarranted assumptions leading to undesirable further predictions contradicted by available experimental evidence. We argue that the hypothesis of a maintenance mechanism based on verbal rehearsal that is impeded by concurrent articulation still provides the simplest and most compelling account of our results.

  19. Using the intervention mapping protocol to develop a maintenance programme for the SLIMMER diabetes prevention intervention.

    PubMed

    Elsman, Ellen B M; Leerlooijer, Joanne N; Ter Beek, Josien; Duijzer, Geerke; Jansen, Sophia C; Hiddink, Gerrit J; Feskens, Edith J M; Haveman-Nies, Annemien

    2014-10-27

    Although lifestyle interventions have shown to be effective in reducing the risk for type 2 diabetes mellitus, maintenance of achieved results is difficult, as participants often experience relapse after the intervention has ended. This paper describes the systematic development of a maintenance programme for the extensive SLIMMER intervention, an existing diabetes prevention intervention for high-risk individuals, implemented in a real-life setting in the Netherlands. The maintenance programme was developed using the Intervention Mapping protocol. Programme development was informed by a literature study supplemented by various focus group discussions and feedback from implementers of the extensive SLIMMER intervention. The maintenance programme was designed to sustain a healthy diet and physical activity pattern by targeting knowledge, attitudes, subjective norms and perceived behavioural control of the SLIMMER participants. Practical applications were clustered into nine programme components, including sports clinics at local sports clubs, a concluding meeting with the physiotherapist and dietician, and a return session with the physiotherapist, dietician and physical activity group. Manuals were developed for the implementers and included a detailed time table and step-by-step instructions on how to implement the maintenance programme. The Intervention Mapping protocol provided a useful framework to systematically plan a maintenance programme for the extensive SLIMMER intervention. The study showed that planning a maintenance programme can build on existing implementation structures of the extensive programme. Future research is needed to determine to what extent the maintenance programme contributes to sustained effects in participants of lifestyle interventions.

  20. (n, N) type maintenance policy for multi-component systems with failure interactions

    NASA Astrophysics Data System (ADS)

    Zhang, Zhuoqi; Wu, Su; Li, Binfeng; Lee, Seungchul

    2015-04-01

    This paper studies maintenance policies for multi-component systems in which failure interactions and opportunistic maintenance (OM) involve. This maintenance problem can be formulated as a Markov decision process (MDP). However, since an action set and state space in MDP exponentially expand as the number of components increase, traditional approaches are computationally intractable. To deal with curse of dimensionality, we decompose such a multi-component system into mutually influential single-component systems. Each single-component system is formulated as an MDP with the objective of minimising its long-run average maintenance cost. Under some reasonable assumptions, we prove the existence of the optimal (n, N) type policy for a single-component system. An algorithm to obtain the optimal (n, N) type policy is also proposed. Based on the proposed algorithm, we develop an iterative approximation algorithm to obtain an acceptable maintenance policy for a multi-component system. Numerical examples find that failure interactions and OM pose significant effects on a maintenance policy.

  1. O/S analysis of conceptual space vehicles. Part 1

    NASA Technical Reports Server (NTRS)

    Ebeling, Charles E.

    1995-01-01

    The application of recently developed computer models in determining operational capabilities and support requirements during the conceptual design of proposed space systems is discussed. The models used are the reliability and maintainability (R&M) model, the maintenance simulation model, and the operations and support (O&S) cost model. In the process of applying these models, the R&M and O&S cost models were updated. The more significant enhancements include (1) improved R&M equations for the tank subsystems, (2) the ability to allocate schedule maintenance by subsystem, (3) redefined spares calculations, (4) computing a weighted average of the working days and mission days per month, (5) the use of a position manning factor, and (6) the incorporation into the O&S model of new formulas for computing depot and organizational recurring and nonrecurring training costs and documentation costs, and depot support equipment costs. The case study used is based upon a winged, single-stage, vertical-takeoff vehicle (SSV) designed to deliver to the Space Station Freedom (SSF) a 25,000 lb payload including passengers without a crew.

  2. Evidence that communication impairment in schizophrenia is associated with generalized poor task performance.

    PubMed

    Merrill, Anne M; Karcher, Nicole R; Cicero, David C; Becker, Theresa M; Docherty, Anna R; Kerns, John G

    2017-03-01

    People with schizophrenia exhibit wide-ranging cognitive deficits, including slower processing speed and decreased cognitive control. Disorganized speech symptoms, such as communication impairment, have been associated with poor cognitive control task performance (e.g., goal maintenance and working memory). Whether communication impairment is associated with poorer performance on a broader range of non-cognitive control measures is unclear. In the current study, people with schizophrenia (n =51) and non-psychiatric controls (n =26) completed speech interviews allowing for reliable quantitative assessment of communication impairment. Participants also completed multiple goal maintenance and working memory tasks. In addition, we also examined (a) simple measures of processing speed involving highly automatic prepotent responses and (b) a non-cognitive control measure of general task performance. Schizophrenia communication impairment was significantly associated with poor performance in all cognitive domains, with the largest association found with processing speed (r s =-0.52). Further, communication impairment was also associated with the non-cognitive control measure of poor general task performance (r s =-0.43). In contrast, alogia, a negative speech symptom, and positive symptoms were less if at all related to cognitive task performance. Overall, this study suggests that communication impairment in schizophrenia may be associated with relatively generalized poor cognitive task performance. Copyright © 2017 Elsevier Ireland Ltd. All rights reserved.

  3. The air transportation industry birthplace of reliability-centered maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matteson, T.D.

    1996-08-01

    The 1980s and 1970s provided a timely opportunity for examining and radically changing the process called {open_quotes}preventive maintenance{close_quotes} as it is applied to the aircraft used for scheduled air transportation. The Federal Aviation Administration and four major airlines, United, American, Pan American and Trans World, were the {open_quotes}principals{close_quotes} in that process. While United`s work with the FAA on the Boeing 737 had opened the door a crack, the Boeing 747 presented a major opportunity to radically improve the process for maintenance program design. That program was guided by the results of United`s analyses of failure data from operations of severalmore » fleets, each larger than 100 aircraft, and the concurrent experience of American, Pan American and Trans World. That knowledge provided the insights necessary to support an entirely different approach to maintenance program design. As a result, while United`s existing maintenance program required scheduled overhaul of 339 items on each DC-8, it required overhaul of only 8 items on the B-7471 Although the initial thrust of that work focused on components of active systems, there was concurrent work focused on items whose principal function was to carry the loads associated with operations. That program focused on the classification of structurally-significant items and their classification as {open_quotes}safe life{close_quotes} or {open_quotes}damage tolerant{close_quote} to determine what periodic replacements or repeated inspections were required. That work came to the attention of the Department of Defense which supported preparation of the book-length report by F. Stanley Nowlan and Howard F. Heap at United Airlines entitled {open_quote}Reliability-Centered maintenance{close_quotes}.« less

  4. Management, Maintenance, and Upkeep of the Baseline COMO III Air Defense Model.

    DTIC Science & Technology

    1986-10-20

    weapon subsystems. The sensor subsystems include passive, infrared (IR), television, and a nonimaging sensor and observer, typically the vehicle driver...initially scheduled from the enter game event (DGO) and is rescheduled on a cyclic basis. When radar target detection occurs, the optical search process (DG9...one search cycle in elevation by the track radar/gunner’s optics . DG1 constantly monitors the radar surveillance search volume and when a higher

  5. p63 in skin development and ectodermal dysplasias

    PubMed Central

    Koster, Maranke I.

    2010-01-01

    The transcription factor p63 is critically important for skin development and maintenance. Processes that require p63 include epidermal lineage commitment, epidermal differentiation, cell adhesion, and basement membrane formation. Not surprisingly, alterations in the p63 pathway underlie a subset of ectodermal dysplasias, developmental syndromes in which the skin and skin appendages do not develop normally. This review summarizes the current understanding of the role of p63 in normal development and ectodermal dysplasias. PMID:20445549

  6. 48 CFR 208.7400 - Scope of subpart.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OF DEFENSE ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Enterprise Software... commercial software and software maintenance, including software and software maintenance that is acquired...

  7. 48 CFR 208.7400 - Scope of subpart.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OF DEFENSE ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Enterprise Software... commercial software and software maintenance, including software and software maintenance that is acquired...

  8. 48 CFR 208.7400 - Scope of subpart.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... OF DEFENSE ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Enterprise Software... commercial software and software maintenance, including software and software maintenance that is acquired...

  9. 48 CFR 208.7400 - Scope of subpart.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... OF DEFENSE ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Enterprise Software... commercial software and software maintenance, including software and software maintenance that is acquired...

  10. Evolution of aging: individual life history trade-offs and population heterogeneity account for mortality patterns across species.

    PubMed

    Le Cunff, Y; Baudisch, A; Pakdaman, K

    2014-08-01

    A broad range of mortality patterns has been documented across species, some even including decreasing mortality over age. Whether there exist a common denominator to explain both similarities and differences in these mortality patterns remains an open question. The disposable soma theory, an evolutionary theory of aging, proposes that universal intracellular trade-offs between maintenance/lifespan and reproduction would drive aging across species. The disposable soma theory has provided numerous insights concerning aging processes in single individuals. Yet, which specific population mortality patterns it can lead to is still largely unexplored. In this article, we propose a model exploring the mortality patterns which emerge from an evolutionary process including only the disposable soma theory core principles. We adapt a well-known model of genomic evolution to show that mortality curves producing a kink or mid-life plateaus derive from a common minimal evolutionary framework. These mortality shapes qualitatively correspond to those of Drosophila melanogaster, Caenorhabditis elegans, medflies, yeasts and humans. Species evolved in silico especially differ in their population diversity of maintenance strategies, which itself emerges as an adaptation to the environment over generations. Based on this integrative framework, we also derive predictions and interpretations concerning the effects of diet changes and heat-shock treatments on mortality patterns. © 2014 The Authors. Journal of Evolutionary Biology © 2014 European Society For Evolutionary Biology.

  11. 26 CFR 1.642(i)-2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... section) have been sold; including gardening, road maintenance, water line and drain repair and other... care fund or cemetery has an obligation for care and maintenance within the meaning of § 1.642 (i)-1(c)(1). (d) Care and maintenance. For purposes of section 642(i) and this section, the term care and...

  12. 78 FR 282 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-03

    ... maintenance levels. Level one includes roads, which are closed and maintained only to protect the environment... commercial users to apply and pay for a permit to use the FS Road System. Maintenance resulting from...-41 or FS-7700-48, to identify the road maintenance that is the direct result of the applicant's...

  13. 76 FR 67670 - Basin Electric Power Cooperative, Inc.: Notice of Intent To Prepare an Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ..., modifications to 4 existing substations, a 345-kV switchyard, maintenance access roads, temporary construction... will address the construction, operation, and maintenance of Basin Electric's proposed Project. The Project includes construction, operation and maintenance of approximately 190 miles of new 345-kV single...

  14. 77 FR 36251 - Intermountain Region, Boise National Forest; Emmett Ranger District, Idaho; Scriver Creek...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... relocated segment of NFS Road 696D would be decommissioned); and (4) road maintenance activities would occur... maintenance activities may include but are not limited to road prism blading, spot aggregate placement...) Permanent national forest system (NFS) roads can increase long term resource impacts and road maintenance...

  15. 46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...

  16. 46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...

  17. 46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...

  18. 46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...

  19. 45 CFR 233.53 - Support and maintenance assistance (including home energy assistance) in AFDC.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... excluded from income and resources. (b) Definitions. The following definitions are limited to the support... income and resources support and maintenance assistance, the State plan for AFDC must as specified below..., from income and resources, support and maintenance assistance (as defined in paragraph (b) of this...

  20. 10 CFR 50.65 - Requirements for monitoring the effectiveness of maintenance at nuclear power plants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... maintenance at nuclear power plants. 50.65 Section 50.65 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC... Construction Permits § 50.65 Requirements for monitoring the effectiveness of maintenance at nuclear power..., including normal shutdown operations. (a)(1) Each holder of an operating license for a nuclear power plant...

Top