Toward a General Research Process for Using Dubin's Theory Building Model
ERIC Educational Resources Information Center
Holton, Elwood F.; Lowe, Janis S.
2007-01-01
Dubin developed a widely used methodology for theory building, which describes the components of the theory building process. Unfortunately, he does not define a research process for implementing his theory building model. This article proposes a seven-step general research process for implementing Dubin's theory building model. An example of a…
23 CFR 636.109 - How does the NEPA process relate to the design-build procurement process?
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false How does the NEPA process relate to the design-build... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.109 How does the NEPA process relate to the design-build procurement process? The purpose of this section is to ensure that...
23 CFR 636.109 - How does the NEPA process relate to the design-build procurement process?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false How does the NEPA process relate to the design-build... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.109 How does the NEPA process relate to the design-build procurement process? The purpose of this section is to ensure that...
23 CFR 636.109 - How does the NEPA process relate to the design-build procurement process?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false How does the NEPA process relate to the design-build... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.109 How does the NEPA process relate to the design-build procurement process? The purpose of this section is to ensure that...
23 CFR 636.109 - How does the NEPA process relate to the design-build procurement process?
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false How does the NEPA process relate to the design-build... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.109 How does the NEPA process relate to the design-build procurement process? The purpose of this section is to ensure that...
23 CFR 636.109 - How does the NEPA process relate to the design-build procurement process?
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false How does the NEPA process relate to the design-build... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.109 How does the NEPA process relate to the design-build procurement process? The purpose of this section is to ensure that...
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP601) BASEMENT SHOWING PROCESS ...
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601) BASEMENT SHOWING PROCESS CORRIDOR AND EIGHTEEN CELLS. TO LEFT IS LABORATORY BUILDING (CPP-602). INL DRAWING NUMBER 200-0601-00-706-051981. ALTERNATE ID NUMBER CPP-E-1981. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
BUILDING DETAILS AND SECTIONS OF MAIN PROCESSING BUILDING (CPP601). INL ...
BUILDING DETAILS AND SECTIONS OF MAIN PROCESSING BUILDING (CPP-601). INL DRAWING NUMBER 200-0601-00-291-103080. ALTERNATE ID NUMBER 542-11-B-74. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Computational Process Modeling for Additive Manufacturing
NASA Technical Reports Server (NTRS)
Bagg, Stacey; Zhang, Wei
2014-01-01
Computational Process and Material Modeling of Powder Bed additive manufacturing of IN 718. Optimize material build parameters with reduced time and cost through modeling. Increase understanding of build properties. Increase reliability of builds. Decrease time to adoption of process for critical hardware. Potential to decrease post-build heat treatments. Conduct single-track and coupon builds at various build parameters. Record build parameter information and QM Meltpool data. Refine Applied Optimization powder bed AM process model using data. Report thermal modeling results. Conduct metallography of build samples. Calibrate STK models using metallography findings. Run STK models using AO thermal profiles and report STK modeling results. Validate modeling with additional build. Photodiode Intensity measurements highly linear with power input. Melt Pool Intensity highly correlated to Melt Pool Size. Melt Pool size and intensity increase with power. Applied Optimization will use data to develop powder bed additive manufacturing process model.
PROCESS WATER BUILDING, TRA605. CONTEXTUAL VIEW, CAMERA FACING SOUTHEAST. PROCESS ...
PROCESS WATER BUILDING, TRA-605. CONTEXTUAL VIEW, CAMERA FACING SOUTHEAST. PROCESS WATER BUILDING AND ETR STACK ARE IN LEFT HALF OF VIEW. TRA-666 IS NEAR CENTER, ABUTTED BY SECURITY BUILDING; TRA-626, AT RIGHT EDGE OF VIEW BEHIND BUS. INL NEGATIVE NO. HD46-34-1. Mike Crane, Photographer, 4/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
NASA Astrophysics Data System (ADS)
Farid, V. L.; Wonorahardjo, S.
2018-05-01
The implementation of Green Building criteria is relatively new in architectural practice, especially in Indonesia. Consequently, the integration of these criteria into design process has the potential to change the design process itself. The implementation of the green building criteria into the conventional design process will be discussed in this paper. The concept of this project is to design a residential unit with a natural air-conditioning system. To achieve this purpose, the Green Building criteria has been implemented since the beginning of the design process until the detailing process on the end of the project. Several studies was performed throughout the design process, such as: (1) Conceptual review, where several professionally proved theories related to Tropical Architecture and passive design are used for a reference, and (2) Computer simulations, such as Computational Fluid Dynamics (CFD) and wind tunnel simulation, used to represent the dynamic response of the surrounding environment towards the building. Hopefully this paper may become a reference for designing a green residential building.
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP601), SECOND FLOOR SHOWING ...
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601), SECOND FLOOR SHOWING PROCESS MAKEUP AREA AND EIGHTEEN CELLS AND ADJOINING REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING COLD LAB, DECONTAMINATION ROOM, MULTICURIE CELL ROOM, AND OFFICES. TO LEFT ARE LABORATORY BUILDING (CPP-602) AND MAINTENANCE BUILDING (CPP-630). INL DRAWING NUMBER 200-0601-00-706-051980. ALTERNATE ID NUMBER CPP-E-1980. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Hoskinson, Anne-Marie
2010-01-01
Biological problems in the twenty-first century are complex and require mathematical insight, often resulting in mathematical models of biological systems. Building mathematical-biological models requires cooperation among biologists and mathematicians, and mastery of building models. A new course in mathematical modeling presented the opportunity to build both content and process learning of mathematical models, the modeling process, and the cooperative process. There was little guidance from the literature on how to build such a course. Here, I describe the iterative process of developing such a course, beginning with objectives and choosing content and process competencies to fulfill the objectives. I include some inductive heuristics for instructors seeking guidance in planning and developing their own courses, and I illustrate with a description of one instructional model cycle. Students completing this class reported gains in learning of modeling content, the modeling process, and cooperative skills. Student content and process mastery increased, as assessed on several objective-driven metrics in many types of assessments.
2010-01-01
Biological problems in the twenty-first century are complex and require mathematical insight, often resulting in mathematical models of biological systems. Building mathematical–biological models requires cooperation among biologists and mathematicians, and mastery of building models. A new course in mathematical modeling presented the opportunity to build both content and process learning of mathematical models, the modeling process, and the cooperative process. There was little guidance from the literature on how to build such a course. Here, I describe the iterative process of developing such a course, beginning with objectives and choosing content and process competencies to fulfill the objectives. I include some inductive heuristics for instructors seeking guidance in planning and developing their own courses, and I illustrate with a description of one instructional model cycle. Students completing this class reported gains in learning of modeling content, the modeling process, and cooperative skills. Student content and process mastery increased, as assessed on several objective-driven metrics in many types of assessments. PMID:20810966
29. Perimeter acquisition radar building room #318, data processing system ...
29. Perimeter acquisition radar building room #318, data processing system area; data processor maintenance and operations center, showing data processing consoles - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND
NASA Astrophysics Data System (ADS)
Chicea, Anca-Lucia
2015-09-01
The paper presents the process of building geometric and kinematic models of a technological equipment used in the process of manufacturing devices. First, the process of building the model for a six axes industrial robot is presented. In the second part of the paper, the process of building the model for a five-axis CNC milling machining center is also shown. Both models can be used for accurate cutting processes simulation of complex parts, such as prosthetic devices.
2012-08-01
Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology Innovation In fo...is unlimited. ERDC/ITL TR-12-2 August 2012 Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology...and to enhance the quality of projects through the design, construction, and handover phases. Building Information Modeling ( BIM ) is a
Using Wikis for Learning and Knowledge Building: Results of an Experimental Study
ERIC Educational Resources Information Center
Kimmerle, Joachim; Moskaliuk, Johannes; Cress, Ulrike
2011-01-01
Computer-supported learning and knowledge building play an increasing role in online collaboration. This paper outlines some theories concerning the interplay between individual processes of learning and collaborative processes of knowledge building. In particular, it describes the co-evolution model that attempts to examine processes of learning…
EAST ELEVATION OF MAIN PROCESSING BUILDING (CPP601) LOOKING NORTHWEST. MAINTENANCE ...
EAST ELEVATION OF MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTHWEST. MAINTENANCE SHOP AND OFFICE BUILDING (CPP-630) ON RIGHT IN PHOTO. INL PHOTO NUMBER HD-22-3-2. Mike Crane, Photographer, 11/1998 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
INTERIOR PHOTO OF MAIN PROCESSING BUILDING PROCESS MAKEUP AREA (CPP601) ...
INTERIOR PHOTO OF MAIN PROCESSING BUILDING PROCESS MAKEUP AREA (CPP-601) LOOKING SOUTHWEST. PHOTO TAKEN FROM NORTHEAST CORNER. INL PHOTO NUMBER HD-50-4-2. Mike Crane, Photographer, 6/2005 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
INTERIOR PHOTO OF MAIN PROCESSING BUILDING PROCESS MAKEUP AREA (CPP601) ...
INTERIOR PHOTO OF MAIN PROCESSING BUILDING PROCESS MAKEUP AREA (CPP-601) LOOKING NORTH. PHOTO TAKEN FROM SOUTHWEST CORNER. INL PHOTO NUMBER HD-50-1-3. Mike Crane, Photographer, 6/2005 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
INTERIOR PHOTO OF MAIN PROCESSING BUILDING (CPP601) PROCESS MAKEUP AREA ...
INTERIOR PHOTO OF MAIN PROCESSING BUILDING (CPP-601) PROCESS MAKEUP AREA LOOKING SOUTH. PHOTO TAKEN FROM CENTER OF WEST WALL. INL PHOTO NUMBER HD-50-1-4. Mike Crane, Photographer, 6/2005 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
INTERIOR PHOTO OF MAIN PROCESSING BUILDING PROCESS MAKEUP AREA (CPP601) ...
INTERIOR PHOTO OF MAIN PROCESSING BUILDING PROCESS MAKEUP AREA (CPP-601) LOOKING NORTHWEST. PHOTO TAKEN FROM MIDDLE OF CORRIDOR. INL PHOTO NUMBER HD-50-2-3. Mike Crane, Photographer, 6/2005 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
INTERIOR PHOTO OF MAIN PROCESSING BUILDING PROCESS MAKEUP AREA (CPP601) ...
INTERIOR PHOTO OF MAIN PROCESSING BUILDING PROCESS MAKEUP AREA (CPP-601) LOOKING SOUTH. PHOTO TAKEN FROM MIDDLE OF CORRIDOR. INL PHOTO NUMBER HD-50-3-2. Mike Crane, Photographer, 6/2005 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
EXTERIOR VIEW, THE SA WETSIDE BUILDING (ALSO KNOWN AS DISTILLATION ...
EXTERIOR VIEW, THE SA WETSIDE BUILDING (ALSO KNOWN AS DISTILLATION BUILDING OR SOLVAY TOWERS BUILDING) THE HEART OF THE SOLVAY PROCESS. VIEW LOOKING EAST. THIS BUILDING WAS BUILT IN 1954 TO REPLACE A SIMILAR STRUCTURE BUILT CIRCA 1907. - Solvay Process Company, SA Wetside Building, Between Willis & Milton Avenue, Solvay, Onondaga County, NY
Analysis of Design-Build Processes, Best Practices, and Applications to the Department of Defense
2006-06-01
NAVFAC design-build processes published in trade journals, books , magazines, internet articles, and DoD policy. In their book , Contract Management...literature review concentrates on recent articles published in books , trade magazines, and on the internet to determine design-build processes and...Keith Molenaar ) Design-build projects under the State of California’s Public Contract Code (Legaltips.org, 2006) requires the owner, for example the
CAPACITY BUILDING PROCESS IN ENVIRONMENTAL AND HEALTH IMPACT ASSESSMENT FOR A THAI COMMUNITY.
Chaithui, Suthat; Sithisarankul, Pornchai; Hengpraprom, Sarunya
2017-03-01
This research aimed at exploring the development of the capacitybuilding process in environmental and health impact assessment, including the consideration of subsequent, capacity-building achievements. Data were gathered through questionnaires, participatory observations, in-depth interviews, focus group discussions, and capacity building checklist forms. These data were analyzed using content analysis, descriptive statistics, and inferential statistics. Our study used the components of the final draft for capacity-building processes consisting of ten steps that were formulated by synthesis from each respective process. Additionally, the evaluation of capacity building levels was performed using 10-item evaluation criteria for nine communities. The results indicated that the communities performed well under these criteria. Finally, exploration of the factors influencing capacity building in environmental and health impact assessment indicated that the learning of community members by knowledge exchange via activities and study visits were the most influential factors of the capacity building processes in environmental and health impact assessment. The final revised version of capacitybuilding process in environmental and health impact assessment could serve as a basis for the consideration of interventions in similar areas, so that they increased capacity in environmental and health impact assessments.
SOUTH SECTION OF WEST ELEVATION OF MAIN PROCESSING BUILDING (CPP601) ...
SOUTH SECTION OF WEST ELEVATION OF MAIN PROCESSING BUILDING (CPP-601) LOOKING EAST. HEADEND PLANT BUILDING (CPP-640) APPEARS ON LEFT IN PHOTO. INL PHOTO NUMBER HD-22-3-3. Mike Crane, Photographer, 11/1998 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Corbie-Smith, Giselle; Bryant, Angela R; Walker, Deborah J; Blumenthal, Connie; Council, Barbara; Courtney, Dana; Adimora, Ada
2015-01-01
In health research, investigators and funders are emphasizing the importance of collaboration between communities and academic institutions to achieve health equity. Although the principles underlying community-academic partnered research have been well-articulated, the processes by which partnerships integrate these principles when working across cultural differences are not as well described. We present how Project GRACE (Growing, Reaching, Advocating for Change and Empowerment) integrated participatory research principles with the process of building individual and partnership capacity. We worked with Vigorous Interventions In Ongoing Natural Settings (VISIONS) Inc., a process consultant and training organization, to develop a capacity building model. We present the conceptual framework and multicultural process of change (MPOC) that was used to build individual and partnership capacity to address health disparities. The process and capacity building model provides a common language, approach, and toolset to understand differences and the dynamics of inequity. These tools can be used by other partnerships in the conduct of research to achieve health equity.
The Effectiveness of Full Day School System for Students’ Character Building
NASA Astrophysics Data System (ADS)
Benawa, A.; Peter, R.; Makmun, S.
2018-01-01
The study aims to put forward that full day school which was delivered in Marsudirini Elementary School in Bogor is effective for students’ character building. The study focused on the implementation of full day school system. The qualitative-based research method applied in the study is characteristic evaluation involving non-participant observation, interview, and documentation analysis. The result of this study concludes that the full day school system is significantly effective in education system for elementary students’ character building. The full day school system embraced the entire relevant processes based on the character building standard. The synergy of comprehensive components in instructional process at full day school has influenced the building of the students’ character effectively and efficiently. The relationship emerged between instructional development process in full day school system and the character building of the students. By developing instructional process through systemic and systematic process in full day school system, the support of stakeholders (leaders, human resources, students, parents’ role) and other components (learning resources, facilities, budget) provides a potent and expeditious contribution for character building among the students eventually.
Coalition, partnership, and constituency building by a state public health agency: a retrospective.
Kimbrell, J D
2000-03-01
This article is a retrospective that traces the development of an evolutionary process for a state health agency in addressing the challenge of implementing core public health functions and the provision of essential services. Coalition, partnership, and constituency building were critical elements in the process. Various initiatives are described and their importance as building blocks to a larger process of organizational change is explained. Key lessons from the process are outlined.
Passive fire building protection system evaluation (case study: millennium ict centre)
NASA Astrophysics Data System (ADS)
Rahman, Vinky; Stephanie
2018-03-01
Passive fire protection system is a system that refers to the building design, both regarding of architecture and structure. This system usually consists of structural protection that protects the structure of the building and prevents the spread of fire and facilitate the evacuation process in case of fire. Millennium ICT Center is the largest electronic shopping center in Medan, Indonesia. As a public building that accommodates the crowd, this building needs a fire protection system by the standards. Therefore, the purpose of this study is to evaluate passive fire protection system of Millennium ICT Center building. The study was conducted to describe the facts of the building as well as direct observation to the research location. The collected data is then processed using the AHP (Analytical Hierarchy Process) method in its weighting process to obtain the reliability value of passive fire protection fire system. The results showed that there are some components of passive fire protection system in the building, but some are still unqualified. The first section in your paper
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP601), FIRST FLOOR SHOWING ...
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601), FIRST FLOOR SHOWING SAMPLE CORRIDORS AND EIGHTEEN CELLS AND ADJOINING REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING REMOTE ANALYTICAL FACILITIES LAB, DECONTAMINATION ROOM, AND MULTICURIE CELL ROOM. TO LEFT ARE LABORATORY BUILDING (CPP-602) AND MAINTENANCE BUILDING (CPP-630). INL DRAWING NUMBER 200-0601-00-706-051979. ALTERNATE ID NUMBER CPP-E-1979. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Plasma technologies application for building materials surface modification
NASA Astrophysics Data System (ADS)
Volokitin, G. G.; Skripnikova, N. K.; Volokitin, O. G.; Shehovtzov, V. V.; Luchkin, A. G.; Kashapov, N. F.
2016-01-01
Low temperature arc plasma was used to process building surface materials, such as silicate brick, sand lime brick, concrete and wood. It was shown that building surface materials modification with low temperature plasma positively affects frost resistance, water permeability and chemical resistance with high adhesion strength. Short time plasma processing is rather economical than traditional processing thermic methods. Plasma processing makes wood surface uniquely waterproof and gives high operational properties, dimensional and geometrical stability. It also increases compression resistance and decreases inner tensions level in material.
CONSTRUCTION VIEW OF MAIN PROCESSING BUILDING (CPP601) LOOKING NORTHWEST. INL ...
CONSTRUCTION VIEW OF MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTHWEST. INL PHOTO NUMBER NRTS-51-1390. Unknown Photographer, 1/31/1951 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
CONSTRUCTION VIEW OF MAIN PROCESSING BUILDING (CPP601) LOOKING EAST. INL ...
CONSTRUCTION VIEW OF MAIN PROCESSING BUILDING (CPP-601) LOOKING EAST. INL PHOTO NUMBER NRTS-51-1547. Unknown Photographer, 2/28/1951 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
NORTH SECTION OF WEST ELEVATION OF MAIN PROCESSING BUILDING (CPP601) ...
NORTH SECTION OF WEST ELEVATION OF MAIN PROCESSING BUILDING (CPP-601) LOOKING EAST. HOT PILOT PLANT BUILDING (CPP-640) APPEARS IN RIGHT OF PHOTO. THE REMOTE ANALYTICAL FACILITY (CPP-627) WAS LOCATED ON CONCRETE PAD IN FOREGROUND. INL PHOTO NUMBER HD-54-33-3. Mike Crane, Photographer, 7/2006 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
WASTE TREATMENT BUILDING SYSTEM DESCRIPTION DOCUMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
F. Habashi
2000-06-22
The Waste Treatment Building System provides the space, layout, structures, and embedded subsystems that support the processing of low-level liquid and solid radioactive waste generated within the Monitored Geologic Repository (MGR). The activities conducted in the Waste Treatment Building include sorting, volume reduction, and packaging of dry waste, and collecting, processing, solidification, and packaging of liquid waste. The Waste Treatment Building System is located on the surface within the protected area of the MGR. The Waste Treatment Building System helps maintain a suitable environment for the waste processing and protects the systems within the Waste Treatment Building (WTB) from mostmore » of the natural and induced environments. The WTB also confines contaminants and provides radiological protection to personnel. In addition to the waste processing operations, the Waste Treatment Building System provides space and layout for staging of packaged waste for shipment, industrial and radiological safety systems, control and monitoring of operations, safeguards and security systems, and fire protection, ventilation and utilities systems. The Waste Treatment Building System also provides the required space and layout for maintenance activities, tool storage, and administrative facilities. The Waste Treatment Building System integrates waste processing systems within its protective structure to support the throughput rates established for the MGR. The Waste Treatment Building System also provides shielding, layout, and other design features to help limit personnel radiation exposures to levels which are as low as is reasonably achievable (ALARA). The Waste Treatment Building System interfaces with the Site Generated Radiological Waste Handling System, and with other MGR systems that support the waste processing operations. The Waste Treatment Building System interfaces with the General Site Transportation System, Site Communications System, Site Water System, MGR Site Layout, Safeguards and Security System, Site Radiological Monitoring System, Site Electrical Power System, Site Compressed Air System, and Waste Treatment Building Ventilation System.« less
Multicriteria Analysis of Assembling Buildings from Steel Frame Structures
NASA Astrophysics Data System (ADS)
Miniotaite, Ruta
2017-10-01
Steel frame structures are often used in the construction of public and industrial buildings. They are used for: all types of slope roofs; walls of newly-built public and industrial buildings; load bearing structures; roofs of renovated buildings. The process of assembling buildings from steel frame structures should be analysed as an integrated process influenced by such factors as construction materials and machinery used, the qualification level of construction workers, complexity of work, available finance. It is necessary to find a rational technological design solution for assembling buildings from steel frame structures by conducting a multiple criteria analysis. The analysis provides a possibility to evaluate the engineering considerations and find unequivocal solutions. The rational alternative of a complex process of assembling buildings from steel frame structures was found through multiple criteria analysis and multiple criteria evaluation. In multiple criteria evaluation of technological solutions for assembling buildings from steel frame structures by pairwise comparison method the criteria by significance are distributed as follows: durability is the most important criterion in the evaluation of alternatives; the price (EUR/unit of measurement) of a part of assembly process; construction workers’ qualification level (category); mechanization level of a part of assembling process (%), and complexity of assembling work (in points) are less important criteria.
CONSTRUCTION PROGRESS PHOTO SHOWING EXCAVATION PIT FOR MAIN PROCESSING BUILDING ...
CONSTRUCTION PROGRESS PHOTO SHOWING EXCAVATION PIT FOR MAIN PROCESSING BUILDING (CPP-601) LOOKING SOUTH. INL PHOTO NUMBER NRTS-50-693. Unknown Photographer, 1950 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
CONSTRUCTION PROGRESS PHOTO SHOWING MAIN PROCESSING BUILDING (CPP601) LOOKING NORTH. ...
CONSTRUCTION PROGRESS PHOTO SHOWING MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTH. INL PHOTO NUMBER NRTS-51-1387. Unknown Photographer, 1/31/1951 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
SOUTH ELEVATION OF MAIN PROCESSING BUILDING (CPP601) LOOKING NORTH. INL ...
SOUTH ELEVATION OF MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTH. INL PHOTO NUMBER HD-22-5-3. Mike Crane, Photographer, 11/1998 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
75 FR 68806 - Statement of Organization, Functions and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-09
... Agency business applications architectures, the engineering of business processes, the building and... architecture, engineers technology for business processes, builds, deploys, maintains and manages enterprise systems and data collections efforts; (5) applies business applications architecture to process specific...
76 FR 37344 - Technology Evaluation Process
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-27
...-NOA-0039] Technology Evaluation Process AGENCY: Office of Energy Efficiency and Renewable Energy... is an extension of a prior RFI seeking comment on a proposed commercial buildings technology... seeks comments and information related to a commercial buildings technology evaluation process. DOE is...
76 FR 30696 - Technology Evaluation Process
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-26
...-NOA-0039] Technology Evaluation Process AGENCY: Office of Energy Efficiency and Renewable Energy... (DOE) seeks comments and information related to a commercial buildings technology evaluation process... technologies for commercial buildings based on the voluntary submittal of product test data. The program would...
Transforming BIM to BEM: Generation of Building Geometry for the NASA Ames Sustainability Base BIM
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Donnell, James T.; Maile, Tobias; Rose, Cody
Typical processes of whole Building Energy simulation Model (BEM) generation are subjective, labor intensive, time intensive and error prone. Essentially, these typical processes reproduce already existing data, i.e. building models already created by the architect. Accordingly, Lawrence Berkeley National Laboratory (LBNL) developed a semi-automated process that enables reproducible conversions of Building Information Model (BIM) representations of building geometry into a format required by building energy modeling (BEM) tools. This is a generic process that may be applied to all building energy modeling tools but to date has only been used for EnergyPlus. This report describes and demonstrates each stage inmore » the semi-automated process for building geometry using the recently constructed NASA Ames Sustainability Base throughout. This example uses ArchiCAD (Graphisoft, 2012) as the originating CAD tool and EnergyPlus as the concluding whole building energy simulation tool. It is important to note that the process is also applicable for professionals that use other CAD tools such as Revit (“Revit Architecture,” 2012) and DProfiler (Beck Technology, 2012) and can be extended to provide geometry definitions for BEM tools other than EnergyPlus. Geometry Simplification Tool (GST) was used during the NASA Ames project and was the enabling software that facilitated semi-automated data transformations. GST has now been superseded by Space Boundary Tool (SBT-1) and will be referred to as SBT-1 throughout this report. The benefits of this semi-automated process are fourfold: 1) reduce the amount of time and cost required to develop a whole building energy simulation model, 2) enable rapid generation of design alternatives, 3) improve the accuracy of BEMs and 4) result in significantly better performing buildings with significantly lower energy consumption than those created using the traditional design process, especially if the simulation model was used as a predictive benchmark during operation. Developing BIM based criteria to support the semi-automated process should result in significant reliable improvements and time savings in the development of BEMs. In order to define successful BIMS, CAD export of IFC based BIMs for BEM must adhere to a standard Model View Definition (MVD) for simulation as provided by the concept design BIM MVD (buildingSMART, 2011). In order to ensure wide scale adoption, companies would also need to develop their own material libraries to support automated activities and undertake a pilot project to improve understanding of modeling conventions and design tool features and limitations.« less
Leading Cultural Change in a School District through a Budget Building Collaboration
ERIC Educational Resources Information Center
Radford, Ricky Warren
2009-01-01
The purpose of this study was to assess, plan, and implement a budget building process through collaboration with the stakeholders of a targeted school district. The research question of this study was, "Will allowing the stakeholders more input, autonomy, and collaboration during a budget building process build a team environment and…
PROCESS WATER BUILDING, TRA605. AERIAL TAKEN WHILE SEVERAL PIPE TRENCHES ...
PROCESS WATER BUILDING, TRA-605. AERIAL TAKEN WHILE SEVERAL PIPE TRENCHES REMAINED OPEN. CAMERA FACES EASTERLY. NOTE DUAL PIPES BETWEEN REACTOR BUILDING AND NORTH SIDE OF PROCESS WATER BUILDING. PIPING NEAR WORKING RESERVOIR HEADS FOR RETENTION RESERVOIR. PIPE FROM DEMINERALIZER ENTERS MTR FROM NORTH. SEE ALSO TRENCH FOR COOLANT AIR DUCT AT SOUTH SIDE OF MTR AND LEADING TO FAN HOUSE AND STACK. INL NEGATIVE NO. 2966-A. Unknown Photographer, 7/31/1951 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
CONSTRUCTION PROGRESS PHOTO SHOWING EXCAVATION PIT FOR MAIN PROCESSING BUILDING ...
CONSTRUCTION PROGRESS PHOTO SHOWING EXCAVATION PIT FOR MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTHWEST. INL PHOTO NUMBER NRTS-50-885. Unknown Photographer, 10/30/1950 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
SOUTH ELEVATION AND DETAILS OF MAIN PROCESSING BUILDING (CPP601). INL ...
SOUTH ELEVATION AND DETAILS OF MAIN PROCESSING BUILDING (CPP-601). INL DRAWING NUMBER 200-0601-00-291-103082. ALTERNATE ID NUMBER 542-12-B-76. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
AERIAL VIEW OF MAIN PROCESSING BUILDING SHOWING CONSTRUCTION PROGRESS AND ...
AERIAL VIEW OF MAIN PROCESSING BUILDING SHOWING CONSTRUCTION PROGRESS AND EXCAVATION FOR LABORATORY ON LEFT. INL PHOTO NUMBER NRTS-51-1759. Unknown Photographer, 3/28/1951 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
EAST AND WEST ELEVATIONS OF MAIN PROCESSING BUILDING (CPP601). INL ...
EAST AND WEST ELEVATIONS OF MAIN PROCESSING BUILDING (CPP-601). INL DRAWING NUMBER 200-0601-00-291-103081. ALTERNATE ID NUMBER 542-11-B-75. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
STRUCTURAL DETAILS AND SECTIONS OF MAIN PROCESSING BUILDING (CPP601). INL ...
STRUCTURAL DETAILS AND SECTIONS OF MAIN PROCESSING BUILDING (CPP-601). INL DRAWING NUMBER 200-0601-00-291-103079. ALTERNATE ID NUMBER 542-11-B-73. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
HACCP-Based Programs for Preventing Disease and Injury from Premise Plumbing: A Building Consensus
McCoy, William F.; Rosenblatt, Aaron A.
2015-01-01
Thousands of preventable injuries and deaths are annually caused by microbial, chemical and physical hazards from building water systems. Water is processed in buildings before use; this can degrade the quality of the water. Processing steps undertaken on-site in buildings often include conditioning, filtering, storing, heating, cooling, pressure regulation and distribution through fixtures that restrict flow and temperature. Therefore, prevention of disease and injury requires process management. A process management framework for buildings is the hazard analysis and critical control point (HACCP) adaptation of failure mode effects analysis (FMEA). It has been proven effective for building water system management. Validation is proof that hazards have been controlled under operating conditions and may include many kinds of evidence including cultures of building water samples to detect and enumerate potentially pathogenic microorganisms. However, results from culture tests are often inappropriately used because the accuracy and precision are not sufficient to support specifications for control limit or action triggers. A reliable negative screen is based on genus-level Polymerase Chain Reaction (PCR) for Legionella in building water systems; however, building water samples with positive results from this test require further analysis by culture methods. PMID:26184325
HACCP-Based Programs for Preventing Disease and Injury from Premise Plumbing: A Building Consensus.
McCoy, William F; Rosenblatt, Aaron A
2015-07-09
Thousands of preventable injuries and deaths are annually caused by microbial, chemical and physical hazards from building water systems. Water is processed in buildings before use; this can degrade the quality of the water. Processing steps undertaken on-site in buildings often include conditioning, filtering, storing, heating, cooling, pressure regulation and distribution through fixtures that restrict flow and temperature. Therefore, prevention of disease and injury requires process management. A process management framework for buildings is the hazard analysis and critical control point (HACCP) adaptation of failure mode effects analysis (FMEA). It has been proven effective for building water system management. Validation is proof that hazards have been controlled under operating conditions and may include many kinds of evidence including cultures of building water samples to detect and enumerate potentially pathogenic microorganisms. However, results from culture tests are often inappropriately used because the accuracy and precision are not sufficient to support specifications for control limit or action triggers. A reliable negative screen is based on genus-level Polymerase Chain Reaction (PCR) for Legionella in building water systems; however, building water samples with positive results from this test require further analysis by culture methods.
Building a Training and Development Program.
ERIC Educational Resources Information Center
Bare, Alan C.
An approach to building an effective training and development (T&D) process within postsecondary institutions is described. The process involves three distinct phases: developing an inservice skills training program, institutionalizing an on-the-job career development process, and conducting organizational development activities. The focus of the…
PLAN SECTIONS AND DETAILS OF CELL HATCHES MAIN PROCESSING BUILDING ...
PLAN SECTIONS AND DETAILS OF CELL HATCHES MAIN PROCESSING BUILDING (CPP-601). INL DRAWING NUMBER 200-0601-00-291-103256. ALTERNATE ID NUMBER 542-11-F-302. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Data Preparation Process for the Buildings Performance Database
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walter, Travis; Dunn, Laurel; Mercado, Andrea
2014-06-30
The Buildings Performance Database (BPD) includes empirically measured data from a variety of data sources with varying degrees of data quality and data availability. The purpose of the data preparation process is to maintain data quality within the database and to ensure that all database entries have sufficient data for meaningful analysis and for the database API. Data preparation is a systematic process of mapping data into the Building Energy Data Exchange Specification (BEDES), cleansing data using a set of criteria and rules of thumb, and deriving values such as energy totals and dominant asset types. The data preparation processmore » takes the most amount of effort and time therefore most of the cleansing process has been automated. The process also needs to adapt as more data is contributed to the BPD and as building technologies over time. The data preparation process is an essential step between data contributed by providers and data published to the public in the BPD.« less
Selected US building industry processes and characteristics. A Project SAGE report
NASA Technical Reports Server (NTRS)
Barbieri, R. H.; Schoen, R.
1978-01-01
Selected multifamily processes were examined using a primarily graphic approach to clarify some of the operational modes into which Project SAGE (solar-assisted gas energy) must fit, both as a product and a process in the U.S. building industry. What SAGE must have or do in order to fit the building industry in the short term, that is, the multifamily submarket as it is presently configured, is delineated.
Waste processing building with incineration technology
NASA Astrophysics Data System (ADS)
Wasilah, Wasilah; Zaldi Suradin, Muh.
2017-12-01
In Indonesia, waste problem is one of major problem of the society in the city as part of their life dynamics. Based on Regional Medium Term Development Plan of South Sulawesi Province in 2013-2018, total volume and waste production from Makassar City, Maros, Gowa, and Takalar Regency estimates the garbage dump level 9,076.949 m3/person/day. Additionally, aim of this design is to present a recommendation on waste processing facility design that would accommodate waste processing process activity by incineration technology and supported by supporting activity such as place of education and research on waste, and the administration activity on waste processing facility. Implementation of incineration technology would reduce waste volume up to 90% followed by relative negative impact possibility. The result planning is in form of landscape layout that inspired from the observation analysis of satellite image line pattern of planning site and then created as a building site pattern. Consideration of building orientation conducted by wind analysis process and sun path by auto desk project Vasari software. The footprint designed by separate circulation system between waste management facility interest and the social visiting activity in order to minimize the croos and thus bring convenient to the building user. Building mass designed by inseparable connection series system, from the main building that located in the Northward, then connected to a centre visitor area lengthways, and walked to the waste processing area into the residue area in the Southward area.
Process Evaluation of AISI 4340 Steel Manufactured by Laser Powder Bed Fusion
NASA Astrophysics Data System (ADS)
Jelis, Elias; Hespos, Michael R.; Ravindra, Nuggehalli M.
2018-01-01
Laser powder bed fusion (L-PBF) involves the consolidation of metal powder, layer by layer, through laser melting and solidification. In this study, process parameters are optimized for AISI 4340 steel to produce dense and homogeneous structures. The optimized process parameters produce mechanical properties at the center of the build plate that are comparable to wrought in the vertical and horizontal orientations after heat treatment and machining. Four subsequent builds are filled with specimens to evaluate the mechanical behavior as a function of location and orientation. Variations in the mechanical properties are likely due to recoater blade interactions with the powder and uneven gas flow. The results obtained in this study are analyzed to assess the reliability and reproducibility of the process. A different build evaluates the performance of near-net-shaped tensile specimens angled 35°-90° from the build plate surface (horizontal). Ductility measurements and surface roughness vary significantly as a function of the build angle. In the stress-relieved and as-built conditions, the mechanical behavior of vertically oriented specimens exhibits somewhat lower and more variable ductility than horizontally oriented specimens. Therefore, several process variables affect the mechanical properties of parts produced by the L-PBF process.
CONSTRUCTION VIEW OF MAIN PROCESSING BUILDING (CPP601) ON THE RIGHT ...
CONSTRUCTION VIEW OF MAIN PROCESSING BUILDING (CPP-601) ON THE RIGHT AND LABORATORY (CPP-602) ON THE LEFT. INL PHOTO NUMBER NRTS-51-3373. Unknown Photographer, 9/28/1951 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Improving the Learning Process in the Latest Prefabricated School Buildings
ERIC Educational Resources Information Center
Pons, Oriol; Oliva, Josep-Manuel; Maas, Sandra-Ruth
2010-01-01
Since 2000 hundreds of school centers have been constructed in Catalonia using industrialized technologies. These centers are modern, useful, educational edifices built using advantageous prefabricated technologies that improve the building process and reduce the environmental impact of the building. This article analyses whether these…
Baneyx, Audrey; Charlet, Jean; Jaulent, Marie-Christine
2007-01-01
Pathologies and acts are classified in thesauri to help physicians to code their activity. In practice, the use of thesauri is not sufficient to reduce variability in coding and thesauri are not suitable for computer processing. We think the automation of the coding task requires a conceptual modeling of medical items: an ontology. Our task is to help lung specialists code acts and diagnoses with software that represents medical knowledge of this concerned specialty by an ontology. The objective of the reported work was to build an ontology of pulmonary diseases dedicated to the coding process. To carry out this objective, we develop a precise methodological process for the knowledge engineer in order to build various types of medical ontologies. This process is based on the need to express precisely in natural language the meaning of each concept using differential semantics principles. A differential ontology is a hierarchy of concepts and relationships organized according to their similarities and differences. Our main research hypothesis is to apply natural language processing tools to corpora to develop the resources needed to build the ontology. We consider two corpora, one composed of patient discharge summaries and the other being a teaching book. We propose to combine two approaches to enrich the ontology building: (i) a method which consists of building terminological resources through distributional analysis and (ii) a method based on the observation of corpus sequences in order to reveal semantic relationships. Our ontology currently includes 1550 concepts and the software implementing the coding process is still under development. Results show that the proposed approach is operational and indicates that the combination of these methods and the comparison of the resulting terminological structures give interesting clues to a knowledge engineer for the building of an ontology.
Self-Assembly: How Nature Builds
ERIC Educational Resources Information Center
Jones, M. Gail; Falvo, Michael R.; Broadwell, Bethany; Dotger, Sharon
2006-01-01
Self-assembly or spontaneous assembly is a process in which materials build themselves without assistance. This process plays a central role in the construction of biological structures and materials such as cells, viruses, and bone, and also in abiotic processes like phase transitions and crystal formation. The principles of self-assembly help…
EQUIPMENT LAYOUT OF MAIN PROCESSING BUILDING (CPP601) LCELL PLAN AND ...
EQUIPMENT LAYOUT OF MAIN PROCESSING BUILDING (CPP-601) L-CELL PLAN AND SECTION SHOWS COMPLEXITY OF CELLS. INL DRAWING NUMBER 200-0601-00-098-105687. ALTERNATE ID NUMBER 4289-20-301. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Innovative model of business process reengineering at machine building enterprises
NASA Astrophysics Data System (ADS)
Nekrasov, R. Yu; Tempel, Yu A.; Tempel, O. A.
2017-10-01
The paper provides consideration of business process reengineering viewed as amanagerial innovation accepted by present day machine building enterprises, as well as waysto improve its procedure. A developed innovative model of reengineering measures isdescribed and is based on the process approach and other principles of company management.
[Building Process and Architectural Planning Characteristics of Daehan Hospital Main Building].
Lee, Geauchul
2016-04-01
This paper explores the introduction process of Daehan Hospital from Japan as the modern medical facility in Korea, and the architectural planning characteristics as a medical facility through the detailed building process of Daehan Hospital main building. The most noticeable characteristic of Daehan Hospital is that it was designed and constructed not by Korean engineers but by Japanese engineers. Therefore, Daehan Hospital was influenced by Japanese early modern medical facility, and Japanese engineers modeled Daehan Hospital main building on Tokyo Medical School main building which was constructed in 1876 as the first national medical school and hospital. The architectural type of Tokyo Medical School main building was a typical school architecture in early Japanese modern period which had a middle corridor and a pseudo Western-style tower, but Tokyo Medical School main building became the model of a medical facility as the symbol of the medical department in Tokyo Imperial University. This was the introduction and transplantation process of Japanese modern 'model' like as other modern systems and technologies during the Korean modern transition period. However, unlike Tokyo Medical School main building, Daehan Hospital main building was constructed not as a wooden building but as a masonry building. Comparing with the function of Daehan Hospital main building, its architectural form and construction costs was excessive scale, which was because Japanese Resident-General of Korea had the intention of ostentation that Japanese modernity was superior to Korean Empire.
Montemurro, Genevieve R; Raine, Kim D; Nykiforuk, Candace I J; Mayan, Maria
2014-09-01
Community capacity-building is a central element to health promotion. While capacity-building features, domains and relationships to program sustainability have been well examined, information on the process of capacity-building as experienced by practitioners is needed. This study examined this process as experienced by coordinators working within a community-based chronic disease prevention project implemented in four communities in Alberta (Canada) from 2005-2010 using a case study approach with a mixed-method design. Data collection involved semi-structured interviews, a focus group and program documents tracking coordinator activity. Qualitative analysis followed the constant comparative method using open, axial and selective coding. Quantitative data were analyzed for frequency of major activity distribution. Capacity-building process involves distinct stages of networking, information exchange, partnering, prioritizing, planning/implementing and supporting/ sustaining. Stages are incremental though not always linear. Contextual factors exert a great influence on the process. Implications for research, practice and policy are discussed. © The Author (2013). Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
Build MyTune: Children's Reflective Practice during Music Creativity Processes
ERIC Educational Resources Information Center
Hsu, Chia-Pao
2015-01-01
The current study examined how components of reflective practice interplay with children's music-making and sharing processes. This study employed a qualitative approach with 11 children who played classroom instruments and researcher-designed computer programs ("Build MyTune I" and "Build MyTune II") while attending music…
7. CONVEYOR DISCHARGE IN HOG HAIR PROCESSING AREA, NORTHWEST CORNER ...
7. CONVEYOR DISCHARGE IN HOG HAIR PROCESSING AREA, NORTHWEST CORNER OF LEVEL 2; HAIR WAS TRANSPORTED BY CONVEYOR FROM BUILDING 40, THEN WASHED, DRIED AND BALED IN BUILDING 148 - Rath Packing Company, Grease Interceptor Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA
ERIC Educational Resources Information Center
Greenman, Jim
1992-01-01
The process of designing a child care center is described. This process includes the conceptual and schematic design, schematic pricing, design development, and construction documents. Overall design criteria, and interior program components, are discussed. (LB)
PROCESS WATER BUILDING, TRA605. ONE OF THREE EVAPORATORS BEFORE IT ...
PROCESS WATER BUILDING, TRA-605. ONE OF THREE EVAPORATORS BEFORE IT IS INSTALLED IN UPPER LEVEL OF EAST HALF OF BUILDING. INL NEGATIVE NO. 1533. Unknown Photographer, 3/1/1951 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Mountain torrents: Quantifying vulnerability and assessing uncertainties
Totschnig, Reinhold; Fuchs, Sven
2013-01-01
Vulnerability assessment for elements at risk is an important component in the framework of risk assessment. The vulnerability of buildings affected by torrent processes can be quantified by vulnerability functions that express a mathematical relationship between the degree of loss of individual elements at risk and the intensity of the impacting process. Based on data from the Austrian Alps, we extended a vulnerability curve for residential buildings affected by fluvial sediment transport processes to other torrent processes and other building types. With respect to this goal to merge different data based on different processes and building types, several statistical tests were conducted. The calculation of vulnerability functions was based on a nonlinear regression approach applying cumulative distribution functions. The results suggest that there is no need to distinguish between different sediment-laden torrent processes when assessing vulnerability of residential buildings towards torrent processes. The final vulnerability functions were further validated with data from the Italian Alps and different vulnerability functions presented in the literature. This comparison showed the wider applicability of the derived vulnerability functions. The uncertainty inherent to regression functions was quantified by the calculation of confidence bands. The derived vulnerability functions may be applied within the framework of risk management for mountain hazards within the European Alps. The method is transferable to other mountain regions if the input data needed are available. PMID:27087696
Hosseinpoor, Ahmad Reza; Nambiar, Devaki; Tawilah, Jihane; Schlotheuber, Anne; Briot, Benedicte; Bateman, Massee; Davey, Tamzyn; Kusumawardani, Nunik; Myint, Theingi; Nuryetty, Mariet Tetty; Prasetyo, Sabarinah; Suparmi; Floranita, Rustini
Inequalities in health represent a major problem in many countries, including Indonesia. Addressing health inequality is a central component of the Sustainable Development Goals and a priority of the World Health Organization (WHO). WHO provides technical support for health inequality monitoring among its member states. Following a capacity-building workshop in the WHO South-East Asia Region in 2014, Indonesia expressed interest in incorporating health-inequality monitoring into its national health information system. This article details the capacity-building process for national health inequality monitoring in Indonesia, discusses successes and challenges, and how this process may be adapted and implemented in other countries/settings. We outline key capacity-building activities undertaken between April 2016 and December 2017 in Indonesia and present the four key outcomes of this process. The capacity-building process entailed a series of workshops, meetings, activities, and processes undertaken between April 2016 and December 2017. At each stage, a range of stakeholders with access to the relevant data and capacity for data analysis, interpretation and reporting was engaged with, under the stewardship of state agencies. Key steps to strengthening health inequality monitoring included capacity building in (1) identification of the health topics/areas of interest, (2) mapping data sources and identifying gaps, (3) conducting equity analyses using raw datasets, and (4) interpreting and reporting inequality results. As a result, Indonesia developed its first national report on the state of health inequality. A number of peer-reviewed manuscripts on various aspects of health inequality in Indonesia have also been developed. The capacity-building process undertaken in Indonesia is designed to be adaptable to other contexts. Capacity building for health inequality monitoring among countries is a critical step for strengthening equity-oriented national health information systems and eventually tackling health inequities.
Managing computer-controlled operations
NASA Technical Reports Server (NTRS)
Plowden, J. B.
1985-01-01
A detailed discussion of Launch Processing System Ground Software Production is presented to establish the interrelationships of firing room resource utilization, configuration control, system build operations, and Shuttle data bank management. The production of a test configuration identifier is traced from requirement generation to program development. The challenge of the operational era is to implement fully automated utilities to interface with a resident system build requirements document to eliminate all manual intervention in the system build operations. Automatic update/processing of Shuttle data tapes will enhance operations during multi-flow processing.
Hybrid processing of laser scanning data
NASA Astrophysics Data System (ADS)
Badenko, Vladimir; Zotov, Dmitry; Fedotov, Alexander
2018-03-01
In this article the analysis of gaps in processing of raw laser scanning data and results of bridging the gaps discovered on the base of usage of laser scanning data for historic building information modeling is presented. The results of the development of a unified hybrid technology for the processing, storage, access and visualization of combined laser scanning and photography data about historical buildings are analyzed. The first result of the technology application for the historical building of St. Petersburg Polytechnic University shows reliability of the proposed approaches.
Patriotic Acts: Five Activities for Identity Building
ERIC Educational Resources Information Center
Soetoro-Ng, Maya
2013-01-01
Building a personal identity is a lifelong, thoughtful process that takes into account not only one's race and ethnicity, but also life experiences, relationships, and communities. The process of exploring and evolving one's identity deserves a place in the classroom. Educators can play a key role in supporting their students' in this process by…
Solar Process Heat Basics | NREL
Process Heat Basics Solar Process Heat Basics Commercial and industrial buildings may use the same , black metal panel mounted on a south-facing wall to absorb the sun's heat. Air passes through the many nonresidential buildings. A typical system includes solar collectors that work along with a pump, heat exchanger
Measures of Student Learning: Building Administrator
ERIC Educational Resources Information Center
Rhode Island Department of Education, 2014
2014-01-01
The purpose of this Guidebook is to describe the process and basic requirements for the student learning measures that are used as part of the building administrator evaluation and support process. For aspects of the process that have room for flexibility and school/district-level discretion, the different options have been clearly separated and…
Multi-Criteria Approach in Multifunctional Building Design Process
NASA Astrophysics Data System (ADS)
Gerigk, Mateusz
2017-10-01
The paper presents new approach in multifunctional building design process. Publication defines problems related to the design of complex multifunctional buildings. Currently, contemporary urban areas are characterized by very intensive use of space. Today, buildings are being built bigger and contain more diverse functions to meet the needs of a large number of users in one capacity. The trends show the need for recognition of design objects in an organized structure, which must meet current design criteria. The design process in terms of the complex system is a theoretical model, which is the basis for optimization solutions for the entire life cycle of the building. From the concept phase through exploitation phase to disposal phase multipurpose spaces should guarantee aesthetics, functionality, system efficiency, system safety and environmental protection in the best possible way. The result of the analysis of the design process is presented as a theoretical model of the multifunctional structure. Recognition of multi-criteria model in the form of Cartesian product allows to create a holistic representation of the designed building in the form of a graph model. The proposed network is the theoretical base that can be used in the design process of complex engineering systems. The systematic multi-criteria approach makes possible to maintain control over the entire design process and to provide the best possible performance. With respect to current design requirements, there are no established design rules for multifunctional buildings in relation to their operating phase. Enrichment of the basic criteria with functional flexibility criterion makes it possible to extend the exploitation phase which brings advantages on many levels.
Search and Coherence-Building in Intuition and Insight Problem Solving.
Öllinger, Michael; von Müller, Albrecht
2017-01-01
Coherence-building is a key concept for a better understanding of the underlying mechanisms of intuition and insight problem solving. There are several accounts that address certain aspects of coherence-building. However, there is still no proper framework defining the general principles of coherence-building. We propose a four-stage model of coherence-building. The first stage starts with spreading activation restricted by constraints. This dynamic is a well-defined rule based process. The second stage is characterized by detecting a coherent state. We adopted a fluency account assuming that the ease of information processing indicates the realization of a coherent state. The third stage is designated to evaluate the result of the coherence-building process and assess whether the given problem is solved or not. If the coherent state does not fit the requirements of the task, the process re-enters at stage 1. These three stages characterize intuition. For insight problem solving a fourth stage is necessary, which restructures the given representation after repeated failure, so that a new search space results. The new search space enables new coherent states. We provide a review of the most important findings, outline our model, present a large number of examples, deduce potential new paradigms and measures that might help to decipher the underlying cognitive processes.
Search and Coherence-Building in Intuition and Insight Problem Solving
Öllinger, Michael; von Müller, Albrecht
2017-01-01
Coherence-building is a key concept for a better understanding of the underlying mechanisms of intuition and insight problem solving. There are several accounts that address certain aspects of coherence-building. However, there is still no proper framework defining the general principles of coherence-building. We propose a four-stage model of coherence-building. The first stage starts with spreading activation restricted by constraints. This dynamic is a well-defined rule based process. The second stage is characterized by detecting a coherent state. We adopted a fluency account assuming that the ease of information processing indicates the realization of a coherent state. The third stage is designated to evaluate the result of the coherence-building process and assess whether the given problem is solved or not. If the coherent state does not fit the requirements of the task, the process re-enters at stage 1. These three stages characterize intuition. For insight problem solving a fourth stage is necessary, which restructures the given representation after repeated failure, so that a new search space results. The new search space enables new coherent states. We provide a review of the most important findings, outline our model, present a large number of examples, deduce potential new paradigms and measures that might help to decipher the underlying cognitive processes. PMID:28611702
Predicting indoor pollutant concentrations, and applications to air quality management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lorenzetti, David M.
Because most people spend more than 90% of their time indoors, predicting exposure to airborne pollutants requires models that incorporate the effect of buildings. Buildings affect the exposure of their occupants in a number of ways, both by design (for example, filters in ventilation systems remove particles) and incidentally (for example, sorption on walls can reduce peak concentrations, but prolong exposure to semivolatile organic compounds). Furthermore, building materials and occupant activities can generate pollutants. Indoor air quality depends not only on outdoor air quality, but also on the design, maintenance, and use of the building. For example, ''sick building'' symptomsmore » such as respiratory problems and headaches have been related to the presence of air-conditioning systems, to carpeting, to low ventilation rates, and to high occupant density (1). The physical processes of interest apply even in simple structures such as homes. Indoor air quality models simulate the processes, such as ventilation and filtration, that control pollutant concentrations in a building. Section 2 describes the modeling approach, and the important transport processes in buildings. Because advection usually dominates among the transport processes, Sections 3 and 4 describe methods for predicting airflows. The concluding section summarizes the application of these models.« less
Selecting a Control Strategy for Plug and Process Loads
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lobato, C.; Sheppy, M.; Brackney, L.
2012-09-01
Plug and Process Loads (PPLs) are building loads that are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the building occupants. PPLs in commercial buildings account for almost 5% of U.S. primary energy consumption. On an individual building level, they account for approximately 25% of the total electrical load in a minimally code-compliant commercial building, and can exceed 50% in an ultra-high efficiency building such as the National Renewable Energy Laboratory's (NREL) Research Support Facility (RSF) (Lobato et al. 2010). Minimizing these loads is a primary challenge in the designmore » and operation of an energy-efficient building. A complex array of technologies that measure and manage PPLs has emerged in the marketplace. Some fall short of manufacturer performance claims, however. NREL has been actively engaged in developing an evaluation and selection process for PPLs control, and is using this process to evaluate a range of technologies for active PPLs management that will cap RSF plug loads. Using a control strategy to match plug load use to users' required job functions is a huge untapped potential for energy savings.« less
Radical Vernacular: Bacterial Architecture on Mars
NASA Astrophysics Data System (ADS)
Dade-Robertson, M.; Ramirez-Figueroa, C.; Zhang, M.
Our current speculative discourse on the colonisation of other planets tends to consider future buildings through the lens of hitech architecture. However, we suggest that developments in biotechnology will enable types of construction which are beyond even our current science fictions. The paper presents an argument for bioengineered building materials framed by the notion of constructing buildings on Mars. It introduces the concept of biomineralisation and its processes and applications, and focuses on the creation of calcium carbonate by certain strains of bacteria. We will suggest that by utilising this process in conjunction with synthetic biology (where bacteria are engineered to survive and respond to the environment on other planets) a building process emerges where the materials are adaptive and, to some extent, self-constructed in relation to their environments. The paper concludes by speculating about a building process involving the use of bioengineered bacteria to consolidate materials, found on the surface of Mars, to create materials and structures which are functionally graded.
NASA Astrophysics Data System (ADS)
Nguyen, Sy Dzung; Nguyen, Quoc Hung; Choi, Seung-Bok
2015-01-01
This paper presents a new algorithm for building an adaptive neuro-fuzzy inference system (ANFIS) from a training data set called B-ANFIS. In order to increase accuracy of the model, the following issues are executed. Firstly, a data merging rule is proposed to build and perform a data-clustering strategy. Subsequently, a combination of clustering processes in the input data space and in the joint input-output data space is presented. Crucial reason of this task is to overcome problems related to initialization and contradictory fuzzy rules, which usually happen when building ANFIS. The clustering process in the input data space is accomplished based on a proposed merging-possibilistic clustering (MPC) algorithm. The effectiveness of this process is evaluated to resume a clustering process in the joint input-output data space. The optimal parameters obtained after completion of the clustering process are used to build ANFIS. Simulations based on a numerical data, 'Daily Data of Stock A', and measured data sets of a smart damper are performed to analyze and estimate accuracy. In addition, convergence and robustness of the proposed algorithm are investigated based on both theoretical and testing approaches.
Life cycle impacts of manufacturing redwood decking in Northern California
Richard D. Bergman; Elaine Oneil; Ivan L. Eastin; Han-Sup Han
2014-01-01
Awareness of the environmental footprint of building construction and use has led to increasing interest in green building. Defining a green building is an evolving process with life cycle inventory and life cycle impact assessment (LCIA) emerging as key tools in that evolution and definition process. This study used LCIA to determine the environmental footprint...
Wolf, Matthew; Miller, Suzanne; DeJong, Doug; House, John A; Dirks, Carl; Beasley, Brent
2016-09-01
To establish a process for the development of a prioritization tool for a clinical decision support build within a computerized provider order entry system and concurrently to prioritize alerts for Saint Luke's Health System. The process of prioritizing clinical decision support alerts included (a) consensus sessions to establish a prioritization process and identify clinical decision support alerts through a modified Delphi process and (b) a clinical decision support survey to validate the results. All members of our health system's physician quality organization, Saint Luke's Care as well as clinicians, administrators, and pharmacy staff throughout Saint Luke's Health System, were invited to participate in this confidential survey. The consensus sessions yielded a prioritization process through alert contextualization and associated Likert-type scales. Utilizing this process, the clinical decision support survey polled the opinions of 850 clinicians with a 64.7 percent response rate. Three of the top rated alerts were approved for the pre-implementation build at Saint Luke's Health System: Acute Myocardial Infarction Core Measure Sets, Deep Vein Thrombosis Prophylaxis within 4 h, and Criteria for Sepsis. This study establishes a process for developing a prioritization tool for a clinical decision support build within a computerized provider order entry system that may be applicable to similar institutions. © The Author(s) 2015.
NASA Astrophysics Data System (ADS)
Moreno, Paola
Buildings, especially in hot climates, consume a lot of energy when people want to be comfortable inside them, which translates to very expensive fees each month. The most innovative response to this problem is renewable energy, that is used, in this case, to run mechanical HVAC systems. Renewable energy is the solution for many problems, but to avoid urban heat islands when using excessive HVAC systems (powered by renewables), and to solve thermal comfort-related problems, there has to be other solution. The major challenge to find it would be to have a change of thinking process. If a building in a hot-arid region uses natural processes to emulate the functions of HVAC systems, and the proper passive strategies, then, it will provide thermal comfort to its users, diminishing the need of a mechanical system. This hypothesis will be carried out by extracting the natural processes found in a specific case in nature, applying them into a building's design, and then simulating its energy efficiency with the adequate software. There will be a comparison of the same proposed building without the natural processes, to have tangible numbers showing that these proposed strategies, in fact, work. With explanatory detailed diagrams and the energy analysis, the hypothesis could be proven correct or incorrect. The significance of this approach relies on the proximity to the natural processes that have been working in different aspects of life since the beginning of time. They have been there all the time, waiting until architects, engineers, and people in general use them, instead of making more new energy-using inventions. By having the numbers from a conventional building and the ones of the proposed building, and the right environmental diagrams, the experiment should be valid. In the near future, there should be more research focused on nature and its processes, in order to be able to reduce the use of mechanical systems, and with that, reduce the energy use and the carbon footprint.
PROCESS WATER BUILDING, TRA605. INSIDE A FLASH EVAPORATOR. INL NEGATIVE ...
PROCESS WATER BUILDING, TRA-605. INSIDE A FLASH EVAPORATOR. INL NEGATIVE NO. 3323. Unknown Photographer, 9/12/1951 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Selected Problems of Applying the Law in Adaptation and Modernization of Buildings in Poland
NASA Astrophysics Data System (ADS)
Korbel, Wojciech
2016-06-01
Chosen problems of law implementation in the contemporary process of building's modernization in Poland. One of the major problems in the contemporary process of building's modernization in Poland is the pluralism of different interpretations of chosen legal terms, existing in the contemporary building code. Incorrect interpretation, results in the incorrect application to the authorities for the proper building permit and as the effect, it causes the lost of time and money. The article tries to identify some of these problems and seeks the solution to solve them, through the evolutionary method of building law creation.
2013-10-01
exchange (COBie), Building Information Modeling ( BIM ), value-added analysis, business processes, project management 16. SECURITY CLASSIFICATION OF: 17...equipment. The innovative aspect of Building In- formation Modeling ( BIM ) is that it creates a computable building descrip- tion. The ability to use a...interoperability. In order for the building information to be interoperable, it must also con- form to a common data model , or schema, that defines the class
Tawilah, Jihane; Schlotheuber, Anne; Bateman, Massee; Davey, Tamzyn; Kusumawardani, Nunik; Myint, Theingi; Nuryetty, Mariet Tetty; Prasetyo, Sabarinah; Suparmi; Floranita, Rustini
2018-01-01
ABSTRACT Background: Inequalities in health represent a major problem in many countries, including Indonesia. Addressing health inequality is a central component of the Sustainable Development Goals and a priority of the World Health Organization (WHO). WHO provides technical support for health inequality monitoring among its member states. Following a capacity-building workshop in the WHO South-East Asia Region in 2014, Indonesia expressed interest in incorporating health-inequality monitoring into its national health information system. Objectives: This article details the capacity-building process for national health inequality monitoring in Indonesia, discusses successes and challenges, and how this process may be adapted and implemented in other countries/settings. Methods: We outline key capacity-building activities undertaken between April 2016 and December 2017 in Indonesia and present the four key outcomes of this process. Results: The capacity-building process entailed a series of workshops, meetings, activities, and processes undertaken between April 2016 and December 2017. At each stage, a range of stakeholders with access to the relevant data and capacity for data analysis, interpretation and reporting was engaged with, under the stewardship of state agencies. Key steps to strengthening health inequality monitoring included capacity building in (1) identification of the health topics/areas of interest, (2) mapping data sources and identifying gaps, (3) conducting equity analyses using raw datasets, and (4) interpreting and reporting inequality results. As a result, Indonesia developed its first national report on the state of health inequality. A number of peer-reviewed manuscripts on various aspects of health inequality in Indonesia have also been developed. Conclusions: The capacity-building process undertaken in Indonesia is designed to be adaptable to other contexts. Capacity building for health inequality monitoring among countries is a critical step for strengthening equity-oriented national health information systems and eventually tackling health inequities. PMID:29569528
Design and Construction Process of Two LEED Certified University Buildings: A Collective Case Study
ERIC Educational Resources Information Center
Rich, Kim
2011-01-01
This study was conducted at the early stages of integrating LEED into the design process in which a clearer understanding of what sustainable and ecological design was about became evident through the duration of designing and building of two academic buildings on a university campus. In this case study, due to utilizing a grounded theory…
Streamlining the Design-to-Build Transition with Build-Optimization Software Tools.
Oberortner, Ernst; Cheng, Jan-Fang; Hillson, Nathan J; Deutsch, Samuel
2017-03-17
Scaling-up capabilities for the design, build, and test of synthetic biology constructs holds great promise for the development of new applications in fuels, chemical production, or cellular-behavior engineering. Construct design is an essential component in this process; however, not every designed DNA sequence can be readily manufactured, even using state-of-the-art DNA synthesis methods. Current biological computer-aided design and manufacture tools (bioCAD/CAM) do not adequately consider the limitations of DNA synthesis technologies when generating their outputs. Designed sequences that violate DNA synthesis constraints may require substantial sequence redesign or lead to price-premiums and temporal delays, which adversely impact the efficiency of the DNA manufacturing process. We have developed a suite of build-optimization software tools (BOOST) to streamline the design-build transition in synthetic biology engineering workflows. BOOST incorporates knowledge of DNA synthesis success determinants into the design process to output ready-to-build sequences, preempting the need for sequence redesign. The BOOST web application is available at https://boost.jgi.doe.gov and its Application Program Interfaces (API) enable integration into automated, customized DNA design processes. The herein presented results highlight the effectiveness of BOOST in reducing DNA synthesis costs and timelines.
NASA Astrophysics Data System (ADS)
Mohamed, Omar Ahmed; Masood, Syed Hasan; Bhowmik, Jahar Lal
2017-07-01
Fused Deposition Modeling (FDM) is one of the prominent additive manufacturing technologies for producing polymer products. FDM is a complex additive manufacturing process that can be influenced by many process conditions. The industrial demands required from the FDM process are increasing with higher level product functionality and properties. The functionality and performance of FDM manufactured parts are greatly influenced by the combination of many various FDM process parameters. Designers and researchers always pay attention to study the effects of FDM process parameters on different product functionalities and properties such as mechanical strength, surface quality, dimensional accuracy, build time and material consumption. However, very limited studies have been carried out to investigate and optimize the effect of FDM build parameters on wear performance. This study focuses on the effect of different build parameters on micro-structural and wear performance of FDM specimens using definitive screening design based quadratic model. This would reduce the cost and effort of additive manufacturing engineer to have a systematic approachto make decision among the manufacturing parameters to achieve the desired product quality.
NASA Astrophysics Data System (ADS)
Qin, Minwu
2018-05-01
With the progress of science and technology, people use more and more types of electrical equipment and the functions are more and more complicated, which put forward higher requirements on the construction quality of electrical construction. If you ignore some of the necessary quality requirements and violate the specification of operation in the process of building electrical construction, that will bring great security risks and resulting in huge economic losses, even endanger personal safety. Manage and control construction quality of building electrical construction must be carried out throughout the whole process of construction. According to the construction characteristics of building electrical construction, this article analyze the construction details that are easy to be ignored but very important in the construction, based on management theory and put forward the methods of quality management in the whole process of building electrical construction. This template explains and demonstrates how to prepare your camera-ready paper for Trans Tech Publications. The best is to read these instructions and follow the outline of this text.
Building a scholar in writing (BSW): A model for developing students' critical writing skills.
Bailey, Annette; Zanchetta, Margareth; Velasco, Divine; Pon, Gordon; Hassan, Aafreen
2015-11-01
Several authors have highlighted the importance of writing in developing reflective thinking skills, transforming knowledge, communicating expressions, and filling knowledge gaps. However, difficulties with higher order processing and critical analysis affect students' ability to write critical and thoughtful essays. The Building a Scholar in Writing (BSW) model is a 6-step process of increasing intricacies in critical writing development. Development of critical writing is proposed to occur in a processed manner that transitions from presenting simple ideas (just bones) in writing, to connecting ideas (connecting bones), to formulating a thesis and connecting key components (constructing a skeleton), to supporting ideas with evidence (adding muscle), to building creativity and originality (adding essential organs), and finally, developing strong, integrated, critical arguments (adding brain). This process symbolically represents the building of a scholar. The idea of building a scholar equates to progressively giving life and meaning to a piece of writing with unique scholarly characteristics. This progression involves a transformation in awareness, thinking, and understanding, as well as advancement in students' level of critical appraisal skills. Copyright © 2015 Elsevier Ltd. All rights reserved.
Mobile Laser Scanning for Indoor Modelling
NASA Astrophysics Data System (ADS)
Thomson, C.; Apostolopoulos, G.; Backes, D.; Boehm, J.
2013-10-01
The process of capturing and modelling buildings has gained increased focus in recent years with the rise of Building Information Modelling (BIM). At the heart of BIM is a process change for the construction and facilities management industries whereby a BIM aids more collaborative working through better information exchange, and as a part of the process Geomatic/Land Surveyors are not immune from the changes. Terrestrial laser scanning has been proscribed as the preferred method for rapidly capturing buildings for BIM geometry. This is a process change from a traditional measured building survey just with a total station and is aided by the increasing acceptance of point cloud data being integrated with parametric building models in BIM tools such as Autodesk Revit or Bentley Architecture. Pilot projects carried out previously by the authors to investigate the geometry capture and modelling of BIM confirmed the view of others that the process of data capture with static laser scan setups is slow and very involved requiring at least two people for efficiency. Indoor Mobile Mapping Systems (IMMS) present a possible solution to these issues especially in time saved. Therefore this paper investigates their application as a capture device for BIM geometry creation over traditional static methods through a fit-for-purpose test.
Portalés, Cristina; Casas, Sergio; Gimeno, Jesús; Fernández, Marcos; Poza, Montse
2018-04-19
Energy-efficient Buildings (EeB) are demanded in today’s constructions, fulfilling the requirements for green cities. Pre-fab buildings, which are modularly fully-built in factories, are a good example of this. Although this kind of building is quite new, the in situ inspection is documented using traditional tools, mainly based on paper annotations. Thus, the inspection process is not taking advantage of new technologies. In this paper, we present the preliminary results of the SIRAE project that aims to provide an Augmented Reality (AR) tool that can seamlessly aid in the regular processes of pre-fab building inspections to detect and eliminate the possible existing quality and energy efficiency deviations. In this regards, we show a description of the current inspection process and how an interactive tool can be designed and adapted to it. Our first results show the design and implementation of our tool, which is highly interactive and involves AR visualizations and 3D data-gathering, allowing the inspectors to quickly manage it without altering the way the inspection process is done. First trials on a real environment show that the tool is promising for massive inspection processes.
Fernández, Marcos; Poza, Montse
2018-01-01
Energy-efficient Buildings (EeB) are demanded in today’s constructions, fulfilling the requirements for green cities. Pre-fab buildings, which are modularly fully-built in factories, are a good example of this. Although this kind of building is quite new, the in situ inspection is documented using traditional tools, mainly based on paper annotations. Thus, the inspection process is not taking advantage of new technologies. In this paper, we present the preliminary results of the SIRAE project that aims to provide an Augmented Reality (AR) tool that can seamlessly aid in the regular processes of pre-fab building inspections to detect and eliminate the possible existing quality and energy efficiency deviations. In this regards, we show a description of the current inspection process and how an interactive tool can be designed and adapted to it. Our first results show the design and implementation of our tool, which is highly interactive and involves AR visualizations and 3D data-gathering, allowing the inspectors to quickly manage it without altering the way the inspection process is done. First trials on a real environment show that the tool is promising for massive inspection processes. PMID:29671799
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kopotic, James D.; Ferri, Mark S.; Buttram, Claude
The East Tennessee Technology Park (ETTP) is the site of five former gaseous diffusion plant (GDP) process buildings that were used to enrich uranium from 1945 to 1985. The process equipment in the original two buildings (K-25 and K-27) was used for the production of highly enriched uranium (HEU), while that in the three later buildings (K-29, K-31 and K-33) produced low enriched uranium (LEU). Equipment was contaminated primarily with uranium and to a lesser extent technetium (Tc). Decommissioning of the GDP process buildings has presented several unique challenges and produced many lessons-learned. Among these is the importance of good,more » up-front characterization in developing the best demolition approach. Also, chemical cleaning of process gas equipment and piping (PGE) prior to shutdown should be considered to minimize the amount of hold-up material that must be removed by demolition crews. Another lesson learned is to maintain shutdown buildings in a dry state to minimize structural degradation which can significantly complicate characterization, deactivation and demolition efforts. Perhaps the most important lesson learned is that decommissioning GDP process buildings is first and foremost a waste logistics challenge. Innovative solutions are required to effectively manage the sheer volume of waste generated from decontamination and demolition (D and D) of these enormous facilities. Finally, close coordination with Security is mandatory to effectively manage Special Nuclear Material (SNM) and classified equipment issues. (authors)« less
PROCESS WATER BUILDING, TRA605. FLASH EVAPORATORS ARE PLACED ON UPPER ...
PROCESS WATER BUILDING, TRA-605. FLASH EVAPORATORS ARE PLACED ON UPPER LEVEL OF EAST SIDE OF BUILDING. WALLS WILL BE FORMED AROUND THEM. WORKING RESERVOIR BEYOND. CAMERA FACING EASTERLY. EXHAUST AIR STACK IS UNDER CONSTRUCTION AT RIGHT OF VIEW. INL NEGATIVE NO. 2579. Unknown Photographer, 6/18/1951 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Engineering Change Management Method Framework in Mechanical Engineering
NASA Astrophysics Data System (ADS)
Stekolschik, Alexander
2016-11-01
Engineering changes make an impact on different process chains in and outside the company, and lead to most error costs and time shifts. In fact, 30 to 50 per cent of development costs result from technical changes. Controlling engineering change processes can help us to avoid errors and risks, and contribute to cost optimization and a shorter time to market. This paper presents a method framework for controlling engineering changes at mechanical engineering companies. The developed classification of engineering changes and accordingly process requirements build the basis for the method framework. The developed method framework comprises two main areas: special data objects managed in different engineering IT tools and process framework. Objects from both areas are building blocks that can be selected to the overall business process based on the engineering process type and change classification. The process framework contains steps for the creation of change objects (both for overall change and for parts), change implementation, and release. Companies can select singleprocess building blocks from the framework, depending on the product development process and change impact. The developed change framework has been implemented at a division (10,000 employees) of a big German mechanical engineering company.
Moore, Jenny; Crozier, Kenda; Kite, Katharine
2012-01-01
The National Health Service in the United Kingdom is committed to a process of reform centred on quality care and innovative practice. Central to this process is the need for research capacity building within the workforce. The aim of this study was to develop an infrastructure for research capacity building within one National Health Service Foundation Trust. Using an Action Research methodology, sixteen individuals were purposefully selected from a population of nurses and midwives to participate in the study. This nonprobability sampling method enabled the researchers to select participants on the basis of who would be most informative about existing research capacity building structures and processes within the Trust. Data were collected in the form of semi-structured individual interviews with each participant. The main findings were that research activity was not embedded in the culture of the organisation, and initiating and undertaking change was a complex process. As a result, a range of structures and processes which were considered necessary to enable the Trust move forward in developing capacity and capability for research were developed and implemented. This paper reports the first two stages of this process, namely: the findings from the pre-step and an outline of how these findings were used to create an infrastructure to support research capacity building within one NHS Foundation Trust Hospital in the United Kingdom. Copyright © 2011 Elsevier Ltd. All rights reserved.
50 CFR 260.99 - Buildings and structures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 50 Wildlife and Fisheries 9 2011-10-01 2011-10-01 false Buildings and structures. 260.99 Section 260.99 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE PROCESSED FISHERY PRODUCTS, PROCESSED PRODUCTS THEREOF, AND CERTAIN OTHER...
50 CFR 260.99 - Buildings and structures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 50 Wildlife and Fisheries 11 2014-10-01 2014-10-01 false Buildings and structures. 260.99 Section 260.99 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE PROCESSED FISHERY PRODUCTS, PROCESSED PRODUCTS THEREOF, AND CERTAIN OTHER...
50 CFR 260.99 - Buildings and structures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 50 Wildlife and Fisheries 11 2013-10-01 2013-10-01 false Buildings and structures. 260.99 Section 260.99 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE PROCESSED FISHERY PRODUCTS, PROCESSED PRODUCTS THEREOF, AND CERTAIN OTHER...
50 CFR 260.99 - Buildings and structures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 50 Wildlife and Fisheries 11 2012-10-01 2012-10-01 false Buildings and structures. 260.99 Section 260.99 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE PROCESSED FISHERY PRODUCTS, PROCESSED PRODUCTS THEREOF, AND CERTAIN OTHER...
Yoo, Sooyoung; Cho, Minsu; Kim, Eunhye; Kim, Seok; Sim, Yerim; Yoo, Donghyun; Hwang, Hee; Song, Minseok
2016-04-01
Many hospitals are increasing their efforts to improve processes because processes play an important role in enhancing work efficiency and reducing costs. However, to date, a quantitative tool has not been available to examine the before and after effects of processes and environmental changes, other than the use of indirect indicators, such as mortality rate and readmission rate. This study used process mining technology to analyze process changes based on changes in the hospital environment, such as the construction of a new building, and to measure the effects of environmental changes in terms of consultation wait time, time spent per task, and outpatient care processes. Using process mining technology, electronic health record (EHR) log data of outpatient care before and after constructing a new building were analyzed, and the effectiveness of the technology in terms of the process was evaluated. Using the process mining technique, we found that the total time spent in outpatient care did not increase significantly compared to that before the construction of a new building, considering that the number of outpatients increased, and the consultation wait time decreased. These results suggest that the operation of the outpatient clinic was effective after changes were implemented in the hospital environment. We further identified improvements in processes using the process mining technique, thereby demonstrating the usefulness of this technique for analyzing complex hospital processes at a low cost. This study confirmed the effectiveness of process mining technology at an actual hospital site. In future studies, the use of process mining technology will be expanded by applying this approach to a larger variety of process change situations. Copyright © 2016. Published by Elsevier Ireland Ltd.
Ostermann, Thomas; Bertram, Mathias; Büssing, Arndt
2010-03-09
Neurological rehabilitation is one of the most care-intensive challenges in the health care system requiring specialist therapeutic and nursing knowledge. In this descriptive pilot study, we investigated the effects of a team building process on perceived work environment, self-ascribed professional competence, life satisfaction, and client satisfaction in an anthroposophic specialized hospital for neurological rehabilitation. The team-building process consisted of didactic instruction and training in problem-solving, teambuilding and constructive conflict resolution. Seventy seven staff members and 44 patients' relatives were asked to complete a survey that included the Work Environment Scale (WES-10), a Life Satisfaction Scale (BMLSS), the Conviction of Therapeutic Competency (CTC) scale and the Client Satisfaction Questionnaire (CSQ-8). To evaluate the outcome of the team building process, we analyzed changes over time in the WES-10 subscales. Additionally the interrelationship between the WES-10 subscales with other subscales and with sociodemographic parameters like age, gender was calculated by means of a bivariate correlation analysis. The team building process had a significant positive effect on perceived work environment in only one area. There was a significant improvement in the ward staffs' perception of their ability to constructively resolve conflicts 3 years after inception of the team building process than there was before inception. However, even in a unit that utilized holistic treatment and nursing in the care of severely disable patients, such care necessitating a very heavy workload, the measurements on the Self Realization, Life Satisfaction and Conviction of Therapeutic Competency scales remained high and unchanged over the three year time period of the study. Strategic interventions might be an option to improve interpersonal relationships and finally quality of patient care.
2010-01-01
Background Neurological rehabilitation is one of the most care-intensive challenges in the health care system requiring specialist therapeutic and nursing knowledge. In this descriptive pilot study, we investigated the effects of a team building process on perceived work environment, self-ascribed professional competence, life satisfaction, and client satisfaction in an anthroposophic specialized hospital for neurological rehabilitation. The team-building process consisted of didactic instruction and training in problem-solving, teambuilding and constructive conflict resolution. Methods Seventy seven staff members and 44 patients' relatives were asked to complete a survey that included the Work Environment Scale (WES-10), a Life Satisfaction Scale (BMLSS), the Conviction of Therapeutic Competency (CTC) scale and the Client Satisfaction Questionnaire (CSQ-8). To evaluate the outcome of the team building process, we analyzed changes over time in the WES-10 subscales. Additionally the interrelationship between the WES-10 subscales with other subscales and with sociodemographic parameters like age, gender was calculated by means of a bivariate correlation analysis. Results The team building process had a significant positive effect on perceived work environment in only one area. There was a significant improvement in the ward staffs' perception of their ability to constructively resolve conflicts 3 years after inception of the team building process than there was before inception. However, even in a unit that utilized holistic treatment and nursing in the care of severely disable patients, such care necessitating a very heavy workload, the measurements on the Self Realization, Life Satisfaction and Conviction of Therapeutic Competency scales remained high and unchanged over the three year time period of the study. Conclusions Strategic interventions might be an option to improve interpersonal relationships and finally quality of patient care. PMID:20214789
NEET-AMM Final Technical Report on Laser Direct Manufacturing (LDM) for Nuclear Power Components
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, Scott; Baca, Georgina; O'Connor, Michael
2015-12-31
Final technical report summarizes the program progress and technical accomplishments of the Laser Direct Manufacturing (LDM) for Nuclear Power Components project. A series of experiments varying build process parameters (scan speed and laser power) were conducted at the outset to establish the optimal build conditions for each of the alloys. Fabrication was completed in collaboration with Quad City Manufacturing Laboratory (QCML). The density of all sample specimens was measured and compared to literature values. Optimal build process conditions giving fabricated part densities close to literature values were chosen for making mechanical test coupons. Test coupons whose principal axis is onmore » the x-y plane (perpendicular to build direction) and on the z plane (parallel to build direction) were built and tested as part of the experimental build matrix to understand the impact of the anisotropic nature of the process.. Investigations are described 316L SS, Inconel 600, 718 and 800 and oxide dispersion strengthed 316L SS (Yttria) alloys.« less
The study of thermal processes in control systems of heat consumption of buildings
NASA Astrophysics Data System (ADS)
Tsynaeva, E.; A, Tsynaeva
2017-11-01
The article discusses the main thermal processes in the automated control systems for heat consumption (ACSHC) of buildings, schematic diagrams of these systems, mathematical models used for description of thermal processes in ACSHC. Conducted verification represented by mathematical models. It was found that the efficiency of the operation of ACSHC depend from the external and internal factors. Numerical study of dynamic modes of operation of ACSHC.
Zhang, Pei-feng; Hu, Yuan-man; He, Hong-shi; Xiong, Zai-ping; Liu, Miao
2010-12-01
In this paper, three-dimensional building information was extracted from high resolution satellite image based on Barista software. Combined with ArcGIS software, the dynamic changes of the building landscape in Tiexi District of Shenyang City during urban renewal process were analyzed from the conversion contribution rate, building density, average building height, and built-up area rate. It was found that during this urban renewal process, four dominant landscape types (vacant lot, residential building, industrial building, and road) were the main parts of the landscape changes. The areas of vacant lot, residential building, commercial building, and road increased, while that of industrial building decreased. The building density decreased, while the average building height increased. There was an obvious regional variation in building landscape. The building density in industrial district was higher than that in residential district, while the average building height was in adverse. The further from the city center, the lower the building density and building average height.
Benedek, C; Descombes, X; Zerubia, J
2012-01-01
In this paper, we introduce a new probabilistic method which integrates building extraction with change detection in remotely sensed image pairs. A global optimization process attempts to find the optimal configuration of buildings, considering the observed data, prior knowledge, and interactions between the neighboring building parts. We present methodological contributions in three key issues: 1) We implement a novel object-change modeling approach based on Multitemporal Marked Point Processes, which simultaneously exploits low-level change information between the time layers and object-level building description to recognize and separate changed and unaltered buildings. 2) To answer the challenges of data heterogeneity in aerial and satellite image repositories, we construct a flexible hierarchical framework which can create various building appearance models from different elementary feature-based modules. 3) To simultaneously ensure the convergence, optimality, and computation complexity constraints raised by the increased data quantity, we adopt the quick Multiple Birth and Death optimization technique for change detection purposes, and propose a novel nonuniform stochastic object birth process which generates relevant objects with higher probability based on low-level image features.
Building of nested components by a double-nozzle droplet deposition process
NASA Astrophysics Data System (ADS)
Li, SuLi; Wei, ZhengYing; Du, Jun; Zhao, Guangxi; Wang, Xin; Lu, BingHeng
2016-07-01
According to the nested components jointed with multiple parts,a double-nozzle droplet deposition process was put forward in this paper, and the experimental system was developed. Through the research on the properties of support materials and the process of double-nozzle droplet deposition, the linkage control of the metal droplet deposition and the support material extrusion was realized, and a nested component with complex construction was fabricated directly. Compared with the traditional forming processes, this double-nozzle deposition process has the advantages of short cycle, low cost and so on. It can provide an approach way to build the nested parts.
Application of Fuzzy Analytic Hierarchy Process to Building Research Teams
NASA Astrophysics Data System (ADS)
Dąbrowski, Karol; Skrzypek, Katarzyna
2016-03-01
Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process) and ANFIS (Adaptive Neuro Fuzzy Inference System) methods in working groups building for R&D projects on the basis of employees skills.
Wijesiri, Buddhi; Egodawatta, Prasanna; McGree, James; Goonetilleke, Ashantha
2016-09-15
Accurate prediction of stormwater quality is essential for developing effective pollution mitigation strategies. The use of models incorporating simplified mathematical replications of pollutant processes is the common practice for determining stormwater quality. However, an inherent process uncertainty arises due to the intrinsic variability associated with pollutant processes, which has neither been comprehensively understood, nor well accounted for in uncertainty assessment of stormwater quality modelling. This review provides the context for defining and quantifying the uncertainty associated with pollutant build-up and wash-off on urban impervious surfaces based on the hypothesis that particle size is predominant in influencing process variability. Critical analysis of published research literature brings scientific evidence together in order to establish the fact that particle size changes with time, and different sized particles exhibit distinct behaviour during build-up and wash-off, resulting in process variability. Analysis of the different adsorption behaviour of particles confirmed that the variations in pollutant load and composition are influenced by particle size. Particle behaviour and variations in pollutant load and composition are related due to the strong affinity of pollutants such as heavy metals and hydrocarbons for specific particle size ranges. As such, the temporal variation in particle size is identified as the key to establishing a basis for assessing build-up and wash-off process uncertainty. Therefore, accounting for pollutant build-up and wash-off process variability, which is influenced by particle size, would facilitate the assessment of the uncertainty associated with modelling outcomes. Furthermore, the review identified fundamental knowledge gaps where further research is needed in relation to: (1) the aggregation of particles suspended in the atmosphere during build-up; (2) particle re-suspension during wash-off; (3) pollutant re-adsorption by different particle size fractions; and (4) development of evidence-based techniques for assessing uncertainty; and (5) methods for translating the knowledge acquired from the investigation of process mechanisms at small scale into catchment scale for stormwater quality modelling. Copyright © 2016 Elsevier Ltd. All rights reserved.
PROCESS WATER BUILDING, TRA605. FLASH EVAPORATOR, CONDENSER (PROJECT FROM EVAPORATOR), ...
PROCESS WATER BUILDING, TRA-605. FLASH EVAPORATOR, CONDENSER (PROJECT FROM EVAPORATOR), AND STEAM EJECTOR (ALONG REAR WALL). INL NEGATIVE NO. 4377. M.H. Bartz, Photographer, 3/5/1952 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Knowledge Building in Asynchronous Discussion Groups: Going Beyond Quantitative Analysis
ERIC Educational Resources Information Center
Schrire, Sarah
2006-01-01
This contribution examines the methodological challenges involved in defining the collaborative knowledge-building processes occurring in asynchronous discussion and proposes an approach that could advance understanding of these processes. The written protocols that are available to the analyst provide an exact record of the instructional…
12 CFR 541.16 - Improved residential real estate.
Code of Federal Regulations, 2010 CFR
2010-01-01
... improved residential real estate means residential real estate containing offsite or other improvements sufficient to make the property ready for primarily residential construction, and real estate in the process of being improved by a building or buildings to be constructed or in the process of construction for...
3. This machine in building #7 plated the hooks used ...
3. This machine in building #7 plated the hooks used on the cross chains in tire chains, by the 'pean' or mechanical process. This process was replaced when coated wire was introduced. - American Chain & Cable Company, East Princess Street (400 Block), York, York County, PA
Modern alchemy: Fred Hoyle and element building by neutron capture
NASA Astrophysics Data System (ADS)
Burbidge, E. Margaret
Fred Hoyle's fundamental work on building the chemical elements by nuclear processes in stars at various stages in their lives began with the building of elements around iron in the very dense hot interiors of stars. Later, in the paper by Burbidge, Burbidge, Fowler and Hoyle, we four showed that Hoyle's "equilibrium process" is one of eight processes required to make all of the isotopes of all the elements detected in the Sun and stars. Neutron capture reactions, which Fred had not considered in his epochal 1946 paper, but for which experimental data were just becoming available in 1957, are very important, in addition to the energy-generating reactions involving hydrogen, helium, carbon, nitrogen and oxygen, for building all of the elements. They are now providing clues to the late stages of stellar evolution and the earliest history of our Galaxy. I describe here our earliest observational work on neutron capture processes in evolved stars, some new work on stars showing the results of the neutron capture reactions, and data relating to processes ending in the production of lead, and I discuss where this fits into the history of stars in our own Galaxy.
NASA Astrophysics Data System (ADS)
Petkov, C. I.
2014-09-01
Fitch proposes an appealing hypothesis that humans are dendrophiles, who constantly build mental trees supported by analogous hierarchical brain processes [1]. Moreover, it is argued that, by comparison, nonhuman animals build flat or more compact behaviorally-relevant structures. Should we thus expect less impressive hierarchical brain processes in other animals? Not necessarily.
Retail Buildings: Assessing and Reducing Plug and Process Loads in Retail Buildings (Fact Sheet)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2013-04-01
Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly large fraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use inmore » retail spaces are poorly understood.« less
The Ames-Lockheed orbiter processing scheduling system
NASA Technical Reports Server (NTRS)
Zweben, Monte; Gargan, Robert
1991-01-01
A general purpose scheduling system and its application to Space Shuttle Orbiter Processing at the Kennedy Space Center (KSC) are described. Orbiter processing entails all the inspection, testing, repair, and maintenance necessary to prepare the Shuttle for launch and takes place within the Orbiter Processing Facility (OPF) at KSC, the Vehicle Assembly Building (VAB), and on the launch pad. The problems are extremely combinatoric in that there are thousands of tasks, resources, and other temporal considerations that must be coordinated. Researchers are building a scheduling tool that they hope will be an integral part of automating the planning and scheduling process at KSC. The scheduling engine is domain independent and is also being applied to Space Shuttle cargo processing problems as well as wind tunnel scheduling problems.
Articulating the Resources for Business Process Analysis and Design
ERIC Educational Resources Information Center
Jin, Yulong
2012-01-01
Effective process analysis and modeling are important phases of the business process management lifecycle. When many activities and multiple resources are involved, it is very difficult to build a correct business process specification. This dissertation provides a resource perspective of business processes. It aims at a better process analysis…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ivan R. Thomas
INMM Abstract 51st Annual Meeting Decommissioning the Fuel Process Building, a Shift in Paradigm for Terminating Safeguards on Process Holdup The Fuel Process Building at the Idaho Nuclear Technology and Engineering Center (INTEC) is being decommissioned after nearly four decades of recovering high enriched uranium from various government owned spent nuclear fuels. The separations process began with fuel dissolution in one of multiple head-ends, followed by three cycles of uranium solvent extraction, and ending with denitration of uranyl nitrate product. The entire process was very complex, and the associated equipment formed an extensive maze of vessels, pumps, piping, and instrumentationmore » within several layers of operating corridors and process cells. Despite formal flushing and cleanout procedures, an accurate accounting for the residual uranium held up in process equipment over extended years of operation, presented a daunting safeguards challenge. Upon cessation of domestic reprocessing, the holdup remained inaccessible and was exempt from measurement during ensuing physical inventories. In decommissioning the Fuel Process Building, the Idaho Cleanup Project, which operates the INTEC, deviated from the established requirements that all nuclear material holdup be measured and credited to the accountability books and that all nuclear materials, except attractiveness level E residual holdup, be transferred to another facility. Instead, the decommissioning involved grouting the process equipment in place, rather than measuring and removing the contained holdup for subsequent transfer. The grouting made the potentially attractiveness level C and D holdup even more inaccessible, thereby effectually converting the holdup to attractiveness level E and allowing for termination of safeguards controls. Prior to grouting the facility, the residual holdup was estimated by limited sampling and destructive analysis of solutions in process lines and by acceptable knowledge based upon the separations process, plant layout, and operating history. The use of engineering estimates, in lieu of approved measurement methods, was justified by the estimated small quantity of holdup remaining, the infeasibility of measuring the holdup in a highly radioactive background, and the perceived hazards to personnel. The alternate approach to quantifying and terminating safeguards on process holdup was approved by deviation.« less
Kayenta Township Building & Safety Department, Tribal Green Building Code Summit Presentation
Tribal Green Building Code Summit Presentation by Kayenta Township Building & Safety Department showing how they established the building department, developed a code adoption and enforcement process, and hired staff to carry out the work.
Food Processors Skills Building Project. Evaluation Report.
ERIC Educational Resources Information Center
White, Eileen Casey
The Food Processors Skills Building project was undertaken by four Oregon community colleges, with funds from the Oregon Economic Development Department and 11 local food processing companies, to address basic skills needs in the food processing industry through the development and implementation of an industry-specific curriculum. Based on…
Developing Evaluation Capacity through Process Use
ERIC Educational Resources Information Center
King, Jean A.
2007-01-01
This article discusses how to make process use an independent variable in evaluation practice: the purposeful means of building an organization's capacity to conduct and use evaluations in the long run. The goal of evaluation capacity building (ECB) is to strengthen and sustain effective program evaluation practices through a number of activities:…
10. VIEW OF PIPING. THE BUILDING HAD OVER 700 MILES ...
10. VIEW OF PIPING. THE BUILDING HAD OVER 700 MILES OF PIPING, OF WHICH 70 MILES WERE PLUTONIUM PROCESSING LINES. THESE PROCESS LINES RAN THROUGH WALLS AND TRAVERSED SEVERAL FLOORS. (6/29/78) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO
Handbook for Educational Buildings Planning. Educational Building and Equipment 9.
ERIC Educational Resources Information Center
Almeida, Rodolfo
Stages in the educational facility planning process are presented in this handbook, with a second focus on implementation. Four chapters provide information on the four cycles of the planning process, which include analysis and diagnosis, research and development, planning and programming, and implementation and evaluation. Characteristics of an…
Schools Designed with Community Participation.
ERIC Educational Resources Information Center
Sanoff, Henry
This publication presents case studies of school buildings to demonstrate the application of a post occupancy evaluation (POE) during various stages of the design and planning process. It explains that because POE is a process for gathering information about a building in use, it can be applied effectively both to renovation and expansion projects…
Credit PSR. This view shows southeast and southwest facades as ...
Credit PSR. This view shows southeast and southwest facades as seen when looking east northeast (70°). This steel frame building is clad in "Transite" board (fire- resistant, pressed asbestos composition board). This structure was built as a back-up to Building 4237/E-38, but no equipment was ever installed. It was equipped instead to conduct tensile tests on propellant samples. In 1984, it was converted into a back-up structure supporting Building 4283/E-84, Propellant Processing Building. Small amounts of HMX propellants were processed and dried here - Jet Propulsion Laboratory Edwards Facility, Oxidizer Dryer Blender Building, Edwards Air Force Base, Boron, Kern County, CA
NASA Technical Reports Server (NTRS)
Peabody, Hume L.
2017-01-01
This presentation is meant to be an overview of the model building process It is based on typical techniques (Monte Carlo Ray Tracing for radiation exchange, Lumped Parameter, Finite Difference for thermal solution) used by the aerospace industry This is not intended to be a "How to Use ThermalDesktop" course. It is intended to be a "How to Build Thermal Models" course and the techniques will be demonstrated using the capabilities of ThermalDesktop (TD). Other codes may or may not have similar capabilities. The General Model Building Process can be broken into four top level steps: 1. Build Model; 2. Check Model; 3. Execute Model; 4. Verify Results.
Characterization of Nonhomogeneous Poisson Processes Via Moment Conditions.
1986-08-01
Poisson processes play an important role in many fields. The Poisson process is one of the simplest counting processes and is a building block for...place of independent increments. This provides a somewhat different viewpoint for examining Poisson processes . In addition, new characterizations for
Process of discharging charge-build up in slag steelmaking processes
Pal, Uday B.; Gazula, Gopala K. M.; Hasham, Ali
1994-01-01
A process and apparatus for improving metal production in ironmaking and steelmaking processes is disclosed. The use of an inert metallic conductor in the slag-containing crucible and the addition of a transition metal oxide to the slag are the disclosed process improvements.
NASA Astrophysics Data System (ADS)
Gradziński, Piotr
2017-10-01
Whereas World’s climate is changing (inter alia, under the influence of architecture activity), the author attempts to reorientations design practice primarily in a direction the use and adapt to the climatic conditions. Architectural Design using in early stages of the architectural Design Process of the building, among other Life Cycle Analysis (LCA) and digital analytical tools BIM (Building Information Modelling) defines the overriding requirements which the designer/architect should meet. The first part, the text characterized the architecture activity influences (by consumption, pollution, waste, etc.) and the use of building materials (embodied energy, embodied carbon, Global Warming Potential, etc.) within the meaning of the direct negative environmental impact. The second part, the paper presents the revision of the methods and analytical techniques prevent negative influences. Firstly, showing the study of the building by using the Life Cycle Analysis of the structure (e.g. materials) and functioning (e.g. energy consumptions) of the architectural object (stages: before use, use, after use). Secondly, the use of digital analytical tools for determining the benefits of running multi-faceted simulations in terms of environmental factors (exposure to light, shade, wind) directly affecting shaping the form of the building. The conclusion, author’s research results highlight the fact that indicates the possibility of building design using the above-mentioned elements (LCA, BIM) causes correction, early designs decisions in the design process of architectural form, minimizing the impact on nature, environment. The work refers directly to the architectural-environmental dimensions, orienting the design process of buildings in respect of widely comprehended climatic changes.
Stanley, Claire; Lindsay, Sally; Parker, Kathryn; Kawamura, Anne; Samad Zubairi, Mohammad
2018-05-09
We previously reported that experienced clinicians find the process of collectively building and participating in simulations provide (1) a unique reflective opportunity; (2) a venue to identify different perspectives through discussion and action in a group; and (3) a safe environment for learning. No studies have assessed the value of collaborating with standardized patients (SPs) and patient facilitators (PFs) in the process. In this work, we describe this collaboration in building a simulation and the key elements that facilitate reflection. Three simulation scenarios surrounding communication were built by teams of clinicians, a PF, and SPs. Six build sessions were audio recorded, transcribed, and thematically analyzed through an iterative process to (1) describe the steps of building a simulation scenario and (2) identify the key elements involved in the collaboration. The five main steps to build a simulation scenario were (1) storytelling and reflection; (2) defining objectives and brainstorming ideas; (3) building a stem and creating a template; (4) refining the scenario with feedback from SPs; and (5) mock run-throughs with follow-up discussion. During these steps, the PF shared personal insights, challenging participants to reflect deeper to better understand and consider the patient's perspective. The SPs provided unique outside perspective to the group. In addition, the interaction between the SPs and the PF helped refine character roles. A collaborative approach incorporating feedback from PFs and SPs to create a simulation scenario is a valuable method to enhance reflective practice for clinicians.
Energy management study: A proposed case of government building
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tahir, Mohamad Zamhari; Nawi, Mohd Nasrun Mohd; Baharum, Mohd Faizal
Align with the current needs of the sustainable and green technology in Malaysian construction industry, this research is conducted to seek and identify opportunities to better manage energy use including the process of understand when, where, and how energy is used in a building. The purpose of this research is to provide a best practice guideline as a practical tool to assist construction industry in Malaysia to improve the energy efficiency of the office building during the post-production by reviewing the current practice of the building operation and maintenance in order to optimum the usage and reduce the amount ofmore » energy input into the building. Therefore, this paper will review the concept of maintenance management, current issue in energy management, and on how the research process will be conducted. There are several process involves and focuses on technical and management techniques such as energy metering, tracing, harvesting, and auditing based on the case study that will be accomplish soon. Accordingly, a case study is appropriate to be selected as a strategic research approach in which involves an empirical investigation of a particular contemporary phenomenon within its real life context using multiple sources of evidence for the data collection process. A Government office building will be selected as an appropriate case study for this research. In the end of this research, it will recommend a strategic approach or model in a specific guideline for enabling energy-efficient operation and maintenance in the office building.« less
Energy management study: A proposed case of government building
NASA Astrophysics Data System (ADS)
Tahir, Mohamad Zamhari; Nawi, Mohd Nasrun Mohd; Baharum, Mohd Faizal
2015-05-01
Align with the current needs of the sustainable and green technology in Malaysian construction industry, this research is conducted to seek and identify opportunities to better manage energy use including the process of understand when, where, and how energy is used in a building. The purpose of this research is to provide a best practice guideline as a practical tool to assist construction industry in Malaysia to improve the energy efficiency of the office building during the post-production by reviewing the current practice of the building operation and maintenance in order to optimum the usage and reduce the amount of energy input into the building. Therefore, this paper will review the concept of maintenance management, current issue in energy management, and on how the research process will be conducted. There are several process involves and focuses on technical and management techniques such as energy metering, tracing, harvesting, and auditing based on the case study that will be accomplish soon. Accordingly, a case study is appropriate to be selected as a strategic research approach in which involves an empirical investigation of a particular contemporary phenomenon within its real life context using multiple sources of evidence for the data collection process. A Government office building will be selected as an appropriate case study for this research. In the end of this research, it will recommend a strategic approach or model in a specific guideline for enabling energy-efficient operation and maintenance in the office building.
Assessment Processes to Increase the Burden of Existing Buildings Using BIM
NASA Astrophysics Data System (ADS)
Szeląg, Romuald
2017-10-01
The process of implementation of the reconstruction of buildings is often associated with the need to adapt them to increased loads. In the restricted access to the archive project documentation it is necessary to use technical solutions to obtain a fairly short period of time necessary to implement the technical parameters of such processes. Dissemination of BIM in the design process can also be used effectively in the processes of identification of existing facilities for the implementation of the work of strengthening or adapting objects to the increased load requirements. Obtained in the process of research and macroscopic data is then used in the processes of numerical processing aimed at developing a numerical model reflects the actual parameters of the structure of the existing structure and, therefore, allows a better look at the object and the execution of the process to strengthen future. This article will identify possibilities for the use of BIM in processes of identification technology buildings and structures and indicated the necessary data to be obtained during the preliminary work. Introduced in model solutions enable the use of multi-criteria analysis of the choice of the most optimal solutions in terms of costs or expenditures of time during the process of construction. Taking the above work by building a numerical model of the object allows every step of verification by authorized person inventoried solutions and enables tracking and changes in the situation of those found derogations in relation to the parameters established at the primary stage. In the event of significant deviations, there is the possibility of rapid changes to the completed process of calculation and presentation of alternative solutions. Availability software using BIM technology is increasingly common here knowledge of the implementation of such solutions will become in a short time, the standard for most objects or engineering structures. The use of modern solutions using the described processes will be discussed on the example of an industrial facility where there was a need for installation of new equipment and adapt it to the technical parameters.
ERIC Educational Resources Information Center
Kogan, Deborah; Koller, Vinz; Kozumplik, Richalene; Lawrence, Mary Ann
This document is part of a five-module training package to help employment and training service providers comply with the Workforce Investment Act (WIA) of 1998 and develop a one-stop training and employment services system. It consists of the participant workbook, trainer manual, and activity worksheets for a module on building a process for…
Field Trial of an Aerosol-Based Enclosure Sealing Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harrington, Curtis; Springer, David
2015-09-01
This report presents the results from several demonstrations of a new method for sealing building envelope air leaks using an aerosol sealing process developed by the Western Cooling Efficiency Center at UC Davis. The process involves pressurizing a building while applying an aerosol sealant to the interior. As air escapes through leaks in the building envelope, the aerosol particles are transported to the leaks where they collect and form a seal that blocks the leak. Standard blower door technology is used to facilitate the building pressurization, which allows the installer to track the sealing progress during the installation and automaticallymore » verify the final building tightness. Each aerosol envelope sealing installation was performed after drywall was installed and taped, and the process did not appear to interrupt the construction schedule or interfere with other trades working in the homes. The labor needed to physically seal bulk air leaks in typical construction will not be replaced by this technology.« less
A Metallurgical Evaluation of the Powder-Bed Laser Additive Manufactured 4140 Steel Material
NASA Astrophysics Data System (ADS)
Wang, Wesley; Kelly, Shawn
2016-03-01
Using laser powder bed fusion (PBF-L) additive manufacturing (AM) process for steel or iron powder has been attempted for decades. This work used a medium carbon steel (AISI 4140) powder to explore the feasibility of AM. The high carbon equivalent of 4140 steel (CEIIW ≈ 0.83) has a strong tendency toward cold cracking. As such, the process parameters must be carefully controlled to ensure the AM build quality. Through an orthogonally designed experimental matrix, a laser-welding procedure was successfully developed to produce 4140 steel AM builds with no welding defects. In addition, the microstructure and micro-cleanliness of the as-welded PBF-L AM builds were also examined. The results showed an ultra-fine martensite lath structure and an ultra-clean internal quality with minimal oxide inclusion distribution. After optimizing the PBF-L AM process parameters, including the laser power and scan speed, the as-welded AM builds yielded an average tensile strength higher than 1482 MPa and an average 33 J Charpy V-notch impact toughness at -18°C. The surface quality, tensile strength, and Charpy V-notch impact toughness of AM builds were comparable to the wrought 4140 steel. The excellent mechanical properties of 4140 steel builds created by the PBF-L AM AM process make industrial production more feasible, which shows great potential for application in the aerospace, automobile, and machinery industries.
Working Papers in Dialogue Modeling, Volume 2.
ERIC Educational Resources Information Center
Mann, William C.; And Others
The technical working papers that comprise the two volumes of this document are related to the problem of creating a valid process model of human communication in dialogue. In Volume 2, the first paper concerns study methodology, and raises such issues as the choice between system-building and process-building, and the advantages of studying cases…
PROCESS WATER BUILDING, TRA605, INTERIOR. FIRST FLOOR. ELECTRICAL EQUIPMENT IN ...
PROCESS WATER BUILDING, TRA-605, INTERIOR. FIRST FLOOR. ELECTRICAL EQUIPMENT IN LEFT HALF OF VIEW. CAMERA IS IN NORTHWEST CORNER FACING SOUTHEAST. INL NEGATIVE NO. HD46-27-1. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
CANAL EMERGES FROM EAST SIDE OF MTR BUILDING. "EXTRA" LENGTH ...
CANAL EMERGES FROM EAST SIDE OF MTR BUILDING. "EXTRA" LENGTH WAS TO STORE SPENT FUEL THAT WOULD ACCUMULATE BEFORE THE CHEMICAL PROCESSING PLANT WAS READY TO PROCESS IT. INL NEGATIVE NO. 1659. Unknown Photographer, 3/9/1951 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
10 CFR 434.517 - HVAC systems and equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... simulation, except that excess capacity provided to meet process loads need not be modeled unless the process... Reference Buildings. The zones in the simulation shall correspond to the zones provided by the controls in... simulation. Table 517.4.1—HVAC System Description for Prototype and Reference Buildings 1,2 HVAC component...
PROCESS WATER BUILDING, TRA605. CONTROL PANEL SUPPLIES STATUS INDICATORS. CARD ...
PROCESS WATER BUILDING, TRA-605. CONTROL PANEL SUPPLIES STATUS INDICATORS. CARD IN LOWER RIGHT WAS INSERTED BY INL PHOTOGRAPHER TO COVER AN OBSOLETE SECURITY RESTRICTION ON ORIGINAL NEGATIVE. INL NEGATIVE NO. 4219. Unknown Photographer, 2/13/1952 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
COMMUNITY CAPACITY BUILDING FOR REVITALIZATION AND SUSTAINABLE REDEVELOPMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Downing, Melinda; Rosenthall, John; Hudson, Michelle
2003-02-27
Capacity building programs help poor and disadvantaged communities to improve their ability to participate in the environmental decision-making processes. They encourage citizen involvement, and provide the tools that enable them to do so. Capacity building enables communities that would otherwise be excluded to participate in the process, leading to better, and more just decisions. The Department of Energy (DOE) continues to be committed to promoting environmental justice and involving its stakeholders more directly in the planning and decision-making process for environmental cleanup. DOE's Environmental Management Program (EM) is in full support of this commitment. Through its environmental justice project, EMmore » provides communities with the capacity to effectively contribute to a complex technical decision-making process by furnishing access to computers, the Internet, training and technical assistance. DOE's Dr. Samuel P. Massie Chairs of Excellence Program (Massie Chairs) function as technical advisors to many of these community projects. The Massie Chairs consist of nationally and internationally recognized engineers and scientists from nine Historically Black Colleges and Universities (HBCUs) and one Hispanic Serving Institution (HIS). This paper will discuss capacity building initiatives in various jurisdictions.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kirka, Michael M.; Medina, Frank; Dehoff, Ryan R.
Here, the electron beam melting (EBM) process was used to fabricate Inconel 718. The microstructure and tensile properties were characterized in both the as-fabricated and post-processed state transverse (T-orientation) and longitudinal (L-orientation) to the build direction. Post-processing involved both a hot isostatic pressing (HIP) and solution treatment and aging (STA) to homogenize the microstructure. In the as-fabricated state, EBM Inconel 718 exhibits a spatially dependent microstructure that is a function of build height. Spanning the last few layers is a cored dendritic structure comprised of the products (carbides and Laves phase) predicted under equilibrium solidification conditions. With increasing distance frommore » the build's top surface, the cored dendritic structure becomes increasingly homogeneous with complete dissolution of the secondary dendrite arms. Further, temporal phase kinetics are observed to lead to the dissolution of the strengthening γ"γ" and precipitation of networks of fine δ needles that span the grains. Microstructurally, post-processing resulted in dissolution of the δ networks and homogeneous precipitation of γ'"γ'" throughout the height of the build. In the as-fabricated state, the monotonic tensile behavior exhibits a height sensitivity within the T-orientation at both 20 and 650 °C. Along the L-orientation, the tensile behavior exhibits strength values comparable to the reference wrought material in the fully heat-treated state. After post-processing, the yield strength, ultimate strength, and elongation at failure for the EBM Inconel 718 were observed to have beneficially increased compared to the as-fabricated material. Further, as a result of post-processing the spatial variance of the ultimate yield strength and elongation at failure within the transverse direction decreased by 4 and 3× respectively.« less
Kirka, Michael M.; Medina, Frank; Dehoff, Ryan R.; ...
2016-10-21
Here, the electron beam melting (EBM) process was used to fabricate Inconel 718. The microstructure and tensile properties were characterized in both the as-fabricated and post-processed state transverse (T-orientation) and longitudinal (L-orientation) to the build direction. Post-processing involved both a hot isostatic pressing (HIP) and solution treatment and aging (STA) to homogenize the microstructure. In the as-fabricated state, EBM Inconel 718 exhibits a spatially dependent microstructure that is a function of build height. Spanning the last few layers is a cored dendritic structure comprised of the products (carbides and Laves phase) predicted under equilibrium solidification conditions. With increasing distance frommore » the build's top surface, the cored dendritic structure becomes increasingly homogeneous with complete dissolution of the secondary dendrite arms. Further, temporal phase kinetics are observed to lead to the dissolution of the strengthening γ"γ" and precipitation of networks of fine δ needles that span the grains. Microstructurally, post-processing resulted in dissolution of the δ networks and homogeneous precipitation of γ'"γ'" throughout the height of the build. In the as-fabricated state, the monotonic tensile behavior exhibits a height sensitivity within the T-orientation at both 20 and 650 °C. Along the L-orientation, the tensile behavior exhibits strength values comparable to the reference wrought material in the fully heat-treated state. After post-processing, the yield strength, ultimate strength, and elongation at failure for the EBM Inconel 718 were observed to have beneficially increased compared to the as-fabricated material. Further, as a result of post-processing the spatial variance of the ultimate yield strength and elongation at failure within the transverse direction decreased by 4 and 3× respectively.« less
NASA Astrophysics Data System (ADS)
Rüther, Heinz; Martine, Hagai M.; Mtalo, E. G.
This paper presents a novel approach to semiautomatic building extraction in informal settlement areas from aerial photographs. The proposed approach uses a strategy of delineating buildings by optimising their approximate building contour position. Approximate building contours are derived automatically by locating elevation blobs in digital surface models. Building extraction is then effected by means of the snakes algorithm and the dynamic programming optimisation technique. With dynamic programming, the building contour optimisation problem is realized through a discrete multistage process and solved by the "time-delayed" algorithm, as developed in this work. The proposed building extraction approach is a semiautomatic process, with user-controlled operations linking fully automated subprocesses. Inputs into the proposed building extraction system are ortho-images and digital surface models, the latter being generated through image matching techniques. Buildings are modeled as "lumps" or elevation blobs in digital surface models, which are derived by altimetric thresholding of digital surface models. Initial windows for building extraction are provided by projecting the elevation blobs centre points onto an ortho-image. In the next step, approximate building contours are extracted from the ortho-image by region growing constrained by edges. Approximate building contours thus derived are inputs into the dynamic programming optimisation process in which final building contours are established. The proposed system is tested on two study areas: Marconi Beam in Cape Town, South Africa, and Manzese in Dar es Salaam, Tanzania. Sixty percent of buildings in the study areas have been extracted and verified and it is concluded that the proposed approach contributes meaningfully to the extraction of buildings in moderately complex and crowded informal settlement areas.
CONTEXTUAL AERIAL VIEW OF "EXCLUSION" MTR AREA WITH IDAHO CHEMICAL ...
CONTEXTUAL AERIAL VIEW OF "EXCLUSION" MTR AREA WITH IDAHO CHEMICAL PROCESSING PLANT IN BACKGROUND AT CENTER TOP OF VIEW. CAMERA FACING EAST. EXCLUSION GATE HOUSE AT LEFT OF VIEW. BEYOND MTR BUILDING AND ITS WING, THE PROCESS WATER BUILDING AND WORKING RESERVOIR ARE LEFT-MOST. FAN HOUSE AND STACK ARE TO ITS RIGHT. PLUG STORAGE BUILDING IS RIGHT-MOST STRUCTURE. NOTE FAN LOFT ABOVE MTR BUILDING'S ONE-STORY WING. THIS WAS LATER CONVERTED FOR OFFICES. INL NEGATIVE NO. 3610. Unknown Photographer, 10/30/1951 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Development and validation of a building design waste reduction model.
Llatas, C; Osmani, M
2016-10-01
Reduction in construction waste is a pressing need in many countries. The design of building elements is considered a pivotal process to achieve waste reduction at source, which enables an informed prediction of their wastage reduction levels. However the lack of quantitative methods linking design strategies to waste reduction hinders designing out waste practice in building projects. Therefore, this paper addresses this knowledge gap through the design and validation of a Building Design Waste Reduction Strategies (Waste ReSt) model that aims to investigate the relationships between design variables and their impact on onsite waste reduction. The Waste ReSt model was validated in a real-world case study involving 20 residential buildings in Spain. The validation process comprises three stages. Firstly, design waste causes were analyzed. Secondly, design strategies were applied leading to several alternative low waste building elements. Finally, their potential source reduction levels were quantified and discussed within the context of the literature. The Waste ReSt model could serve as an instrumental tool to simulate designing out strategies in building projects. The knowledge provided by the model could help project stakeholders to better understand the correlation between the design process and waste sources and subsequently implement design practices for low-waste buildings. Copyright © 2016 Elsevier Ltd. All rights reserved.
Field Impact Evaluation Process on Electronic Tabular Display Subsystem (ETABS).
1979-10-01
structural and process techniques are described. These include a diagonal slice approach to team formulation and several different methods of team building, process control and conflict management . (Author)
Jones, S.A.; Braun, Christopher L.; Lee, Roger W.
2003-01-01
Concentrations of trichloroethene in ground water at the Naval Weapons Industrial Reserve Plant in Dallas, Texas, indicate three source areas of chlorinated solvents?building 1, building 6, and an off-site source west of the facility. The presence of daughter products of reductive dechlorination of trichloroethene, which were not used at the facility, south and southwest of the source areas are evidence that reductive dechlorination is occurring. In places south of the source areas, dissolved oxygen concentrations indicated that reduction of oxygen could be the dominant process, particularly south of building 6; but elevated dissolved oxygen concentrations south of building 6 might be caused by a leaking water or sewer pipe. The nitrite data indicate that denitrification is occurring in places; however, dissolved hydrogen concentrations indicate that iron reduction is the dominant process south of building 6. The distributions of ferrous iron indicate that iron reduction is occurring in places south-southwest of buildings 6 and 1; dissolved hydrogen concentrations generally support the interpretation that iron reduction is the dominant process in those places. The generally low concentrations of sulfide indicate that sulfate reduction is not a key process in most sampled areas, an interpretation that is supported by dissolved hydrogen concentrations. Ferrous iron and dissolved hydrogen concentrations indicate that ferric iron reduction is the primary oxidation-reduction process. Application of mean first-order decay rates in iron-reducing conditions for trichloroethene, dichloroethene, and vinyl chloride yielded half-lives for those solvents of 231, 347, and 2.67 days, respectively. Decay rates, and thus half-lives, at the facility are expected to be similar to those computed. A weighted scoring method to indicate sites where reductive dechlorination might be likely to occur indicated strong evidence for anaerobic biodegradation of chlorinated solvents at six sites. In general, scores were highest for samples collected on the northeast side of the facility.
Code of Federal Regulations, 2010 CFR
2010-01-01
... systems, building load simulation models, statistical regression analysis, or some combination of these..., excluding any cogeneration process for other than a federally owned building or buildings or other federally...
Myths and realities about the recovery of L׳Aquila after the earthquake
Contreras, Diana; Blaschke, Thomas; Kienberger, Stefan; Zeil, Peter
2014-01-01
There is a set of myths which are linked to the recovery of L׳Aquila, such as: the L׳Aquila recovery has come to a halt, it is still in an early recovery phase, and there is economic stagnation. The objective of this paper is threefold: (a) to identify and develop a set of spatial indicators for the case of L׳Aquila, (b) to test the feasibility of a numerical assessment of these spatial indicators as a method to monitor the progress of a recovery process after an earthquake and (c) to answer the question whether the recovery process in L׳Aquila stagnates or not. We hypothesize that after an earthquake the spatial distribution of expert defined variables can constitute an index to assess the recovery process more objectively. In these articles, we aggregated several indicators of building conditions to characterize the physical dimension, and we developed building use indicators to serve as proxies for the socio-economic dimension while aiming for transferability of this approach. The methodology of this research entailed six steps: (1) fieldwork, (2) selection of a sampling area, (3) selection of the variables and indicators for the physical and socio-economic dimensions, (4) analyses of the recovery progress using spatial indicators by comparing the changes in the restricted core area as well as building use over time; (5) selection and integration of the results through expert weighting; and (6) determining hotspots of recovery in L׳Aquila. Eight categories of building conditions and twelve categories of building use were identified. Both indicators: building condition and building use are aggregated into a recovery index. The reconstruction process in the city center of L׳Aquila seems to stagnate, which is reflected by the five following variables: percentage of buildings with on-going reconstruction, partial reconstruction, reconstruction projected residential building use and transport facilities. These five factors were still at low levels within the core area in 2012. Nevertheless, we can conclude that the recovery process in L׳Aquila did not come to a halt but is still ongoing, albeit being slow. PMID:26779431
1. VIEW LOOKING NORTHWEST AT BUILDING 701. BUILDING 701 WAS ...
1. VIEW LOOKING NORTHWEST AT BUILDING 701. BUILDING 701 WAS USED TO DESIGN, BUILD, AND EVALUATE BENCH-SCALE TECHNOLOGIES USED IN ROCKY FLATS WASTE TREATMENT PROCESSES. (1/98) - Rocky Flats Plant, Design Laboratory, Northwest quadrant of Plant, between buildings 776-777 & 771, Golden, Jefferson County, CO
SynTrack: DNA Assembly Workflow Management (SynTrack) v2.0.1
DOE Office of Scientific and Technical Information (OSTI.GOV)
MENG, XIANWEI; SIMIRENKO, LISA
2016-12-01
SynTrack is a dynamic, workflow-driven data management system that tracks the DNA build process: Management of the hierarchical relationships of the DNA fragments; Monitoring of process tasks for the assembly of multiple DNA fragments into final constructs; Creations of vendor order forms with selectable building blocks. Organizing plate layouts barcodes for vendor/pcr/fusion/chewback/bioassay/glycerol/master plate maps (default/condensed); Creating or updating Pre-Assembly/Assembly process workflows with selected building blocks; Generating Echo pooling instructions based on plate maps; Tracking of building block orders, received and final assembled for delivering; Bulk updating of colony or PCR amplification information, fusion PCR and chewback results; Updating with QA/QCmore » outcome with .csv & .xlsx template files; Re-work assembly workflow enabled before and after sequencing validation; and Tracking of plate/well data changes and status updates and reporting of master plate status with QC outcomes.« less
Continuation of research into language concepts for the mission support environment: Source code
NASA Technical Reports Server (NTRS)
Barton, Timothy J.; Ratner, Jeremiah M.
1991-01-01
Research into language concepts for the Mission Control Center is presented. A computer code for source codes is presented. The file contains the routines which allow source code files to be created and compiled. The build process assumes that all elements and the COMP exist in the current directory. The build process places as much code generation as possible on the preprocessor as possible. A summary is given of the source files as used and/or manipulated by the build routine.
7 CFR 4279.113 - Eligible loan purposes.
Code of Federal Regulations, 2013 CFR
2013-01-01
... processing of agricultural products. (1) Examples of potentially eligible production include but are not limited to: An apple orchard in conjunction with a food processing plant; poultry buildings linked to a meat processing operation; or sugar beet production coupled with storage and processing. Any...
7 CFR 4279.113 - Eligible loan purposes.
Code of Federal Regulations, 2012 CFR
2012-01-01
... processing of agricultural products. (1) Examples of potentially eligible production include but are not limited to: An apple orchard in conjunction with a food processing plant; poultry buildings linked to a meat processing operation; or sugar beet production coupled with storage and processing. Any...
7 CFR 4279.113 - Eligible loan purposes.
Code of Federal Regulations, 2014 CFR
2014-01-01
... processing of agricultural products. (1) Examples of potentially eligible production include but are not limited to: An apple orchard in conjunction with a food processing plant; poultry buildings linked to a meat processing operation; or sugar beet production coupled with storage and processing. Any...
7 CFR 4279.113 - Eligible loan purposes.
Code of Federal Regulations, 2011 CFR
2011-01-01
... processing of agricultural products. (1) Examples of potentially eligible production include but are not limited to: An apple orchard in conjunction with a food processing plant; poultry buildings linked to a meat processing operation; or sugar beet production coupled with storage and processing. Any...
PS3-21: Extracting Utilization Data from Clarity into VDW Using Oracle and SAS
Chimmula, Srivardhan
2013-01-01
Background/Aims The purpose of the presentation is to demonstrate how we use SAS and Oracle to load VDW_Utilization, VDW_DX, and VDW_PX tables from Clarity at the Kaiser Permanente Northern California (KPNC) Division of Research (DOR) site. Methods DOR uses the best of Oracle PL/ SQL and SAS capabilities in building Extract Transform and Load (ETL) processes. These processes extract patient encounter, diagnosis, and procedure data from Teradata-based Clarity. The data is then transformed to fit HMORN’s VDW definitions of the table. This data is then loaded into the Oracle-based VDW table on DOR’s research database and then finally a copy of the table is also created as a SAS dataset. Results DOR builds robust and efficient ETL processes that refresh VDW Utilization table on a monthly basis processing millions of records/observations. The ETL processes have the capability to identify daily changes in Clarity and update the VDW tables on a daily basis. Conclusions KPNC DOR combines the best of both Oracle and SAS worlds to build ETL processes that load the data into VDW Utilization tables efficiently.
NASA Astrophysics Data System (ADS)
Halbe, Johannes; Pahl-Wostl, Claudia; Adamowski, Jan
2018-01-01
Multiple barriers constrain the widespread application of participatory methods in water management, including the more technical focus of most water agencies, additional cost and time requirements for stakeholder involvement, as well as institutional structures that impede collaborative management. This paper presents a stepwise methodological framework that addresses the challenges of context-sensitive initiation, design and institutionalization of participatory modeling processes. The methodological framework consists of five successive stages: (1) problem framing and stakeholder analysis, (2) process design, (3) individual modeling, (4) group model building, and (5) institutionalized participatory modeling. The Management and Transition Framework is used for problem diagnosis (Stage One), context-sensitive process design (Stage Two) and analysis of requirements for the institutionalization of participatory water management (Stage Five). Conceptual modeling is used to initiate participatory modeling processes (Stage Three) and ensure a high compatibility with quantitative modeling approaches (Stage Four). This paper describes the proposed participatory model building (PMB) framework and provides a case study of its application in Québec, Canada. The results of the Québec study demonstrate the applicability of the PMB framework for initiating and designing participatory model building processes and analyzing barriers towards institutionalization.
NASA Astrophysics Data System (ADS)
Pasetti Monizza, G.; Matt, D. T.; Benedetti, C.
2016-11-01
According to Wortmann classification, the Building Industry (BI) can be defined as engineer-to-order (ETO) industry: the engineering-process starts only when an order is acquired. This definition implies that every final product (building) is almost unique’ and processes cannot be easily standardized or automated. Because of this, BI is one of the less efficient industries today’ mostly leaded by craftsmanship. In the last years’ several improvements in process efficiency have been made focusing on manufacturing and installation processes only. In order to improve the efficiency of design and engineering processes as well, the scientific community agrees that the most fruitful strategy should be Front-End Design (FED). Nevertheless, effective techniques and tools are missing. This paper discusses outcomes of a research activity that aims at highlighting whether Parametric and Generative Design techniques allow reducing wastes of resources and improving the overall efficiency of the BI, by pushing the Digitalization of design and engineering processes of products. Focusing on the Glued-Laminated-Timber industry, authors will show how Parametric and Generative Design techniques can be introduced in a standard supply-chain system, highlighting potentials and criticism on the supply-chain system as a whole.
Judd, Jenni; Keleher, Helen
2013-06-01
Reorienting work practices to include health promotion and prevention is complex and requires specific strategies and interventions. This paper presents original research that used 'real-world' practice to demonstrate that knowledge gathered from practice is relevant for the development of practice-based evidence. The paper shows how practitioners can inform and influence improvements in health promotion practice. Practitioner-informed evidence necessarily incorporates qualitative research to capture the richness of their reflective experiences. Using a participatory action research (PAR) approach, the research question asked 'what are the core dimensions of building health promotion capacity in a primary health care workforce in a real-world setting?' PAR is a method in which the researcher operates in full collaboration with members of the organisation being studied for the purposes of achieving some kind of change, in this case to increase the amount of health promotion and prevention practice within this community health setting. The PAR process involved six reflection and action cycles over two years. Data collection processes included: survey; in-depth interviews; a training intervention; observations of practice; workplace diaries; and two nominal groups. The listen/reflect/act process enabled lessons from practice to inform future capacity-building processes. This research strengthened and supported the development of health promotion to inform 'better health' practices through respectful change processes based on research, practitioner-informed evidence, and capacity-building strategies. A conceptual model for building health promotion capacity in the primary health care workforce was informed by the PAR processes and recognised the importance of the determinants approach. Practitioner-informed evidence is the missing link in the evidence debate and provides the links between evidence and its translation to practice. New models of health promotion service delivery can be developed in community settings recognising the importance of involving practitioners themselves in these processes.
Two Decades of Structure Building
Gernsbacher, Morton Ann
2014-01-01
During the past decade I have been developing a very simple framework for describing the cognitive processes and mechanisms involved in discourse comprehension. I call this framework the Structure Building Framework, and it is based on evidence provided during the first decade of discourse processing research. According to the Structure Building Framework, the goal of comprehension is to build coherent mental representations or structures. Comprehenders build each structure by first laying a foundation. Comprehenders develop mental structures by mapping on new information when that information coheres or relates to previous information. However, when the incoming information is less related, comprehenders shift and attach a new substructure. The building blocks of mental structures are memory nodes, which are activated by incoming stimuli and controlled by two cognitive mechanisms: suppression and enhancement. In this article, first I review the seminal work on which the Structure Building Framework is based (the first decade of structure building research); then I recount the research I have conducted to test the Structure Building Framework (the second decade of structure building research). PMID:25484476
DOE Office of Scientific and Technical Information (OSTI.GOV)
Katipamula, Srinivas; Gowri, Krishnan; Hernandez, George
This paper describes one such reference process that can be deployed to provide continuous automated conditioned-based maintenance management for buildings that have BIM, a building automation system (BAS) and a computerized maintenance management software (CMMS) systems. The process can be deployed using an open source transactional network platform, VOLTTRON™, designed for distributed sensing and controls and supports both energy efficiency and grid services.
ERIC Educational Resources Information Center
Dulaney, Shannon K.
2013-01-01
This article discusses a qualitative case study examining one middle school's response to intervention (RtI) efforts. Study participants included the principal, assistant principal, and members of the school's leadership team. A description of the RtI consensus and infrastructure-building processes, consideration of the RtI facilitators, and a…
A Descriptive Study of a Building-Based Team Problem-Solving Process
ERIC Educational Resources Information Center
Brewer, Alexander B.
2010-01-01
The purpose of this study was to empirically evaluate Building-Based Teams for General Education Intervention or BBT for GEI. BBT for GEI is a team problem-solving process designed to assist schools in conducting research-based interventions in the general education setting. Problem-solving teams are part of general education and provide support…
ERIC Educational Resources Information Center
Adanir, Gülgün Afacan
2017-01-01
This case study demonstrates the use of interaction analysis techniques to explore students' knowledge building process evidenced in time-stamped logs of a CSCL environment that consists of chat, shared whiteboard, and wiki features. The study was performed in a graduate level course, which covers online assignments that expect students to…
Building Vocabulary and Improving Writing While Developing a Tourist Brochure
ERIC Educational Resources Information Center
Johari, Siti Katijah
2008-01-01
Writing, and the vocabulary building that goes with it, is a more complex process than merely putting words on a page. In the process of acquiring vocabulary, for example, students need to understand not just what individual words mean but also which combinations of these words in sentences or paragraphs convey a meaningful message to the reader…
DOE Office of Scientific and Technical Information (OSTI.GOV)
KLEM, M.J.
2000-05-11
The purpose of these calculations is to develop the material balances for documentation of the Canister Storage Building (CSB) Process Flow Diagram (PFD) and future reference. The attached mass balances were prepared to support revision two of the PFD for the CSB. The calculations refer to diagram H-2-825869.
Building Social Capital in Groups: Facilitating Skill Development for Natural Resource Management
ERIC Educational Resources Information Center
Kilpatrick, Sue
2007-01-01
Analysis of the experiences of four farmer groups set up to learn how to jointly manage local natural resource issues shows that the groups are going though two simultaneous processes. One builds technical competency in natural resource management and the other is the underpinning social process that allows the groups to make decisions and work…
PROCESS WATER BUILDING, TRA605. CAMERA LOOKING EAST AND TO WEST ...
PROCESS WATER BUILDING, TRA-605. CAMERA LOOKING EAST AND TO WEST WALL NOW ENCLOSING FLASH EVAPORATORS. PIPES IN FOREGROUND WILL CARRY DEMINERALIZED COOLING WATER TO AND FROM THE MTR. INL NEGATIVE NO. 2937. Unknown Photographer, 7/30/1951 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
ERIC Educational Resources Information Center
Labin, Susan N.
2014-01-01
A fundamental reason for doing evaluation capacity building (ECB) is to improve program outcomes. Developing common measures of outcomes and the activities, processes, and factors that lead to these outcomes is an important step in moving the science and the practice of ECB forward. This article identifies a number of existing ECB measurement…
ERIC Educational Resources Information Center
Gijlers, H.; Saab, N.; Van Joolingen, W. R.; De Jong, T.; Van Hout-Wolters, B. H. A. M.
2009-01-01
The process of collaborative inquiry learning requires maintaining a mutual understanding of the task, along with reaching consensus on strategies, plans and domain knowledge. In this study, we explore how different supportive measures affect students' consensus-building process, based on a re-analysis of data from four studies. We distinguish…
2014-09-25
CAPE CANAVERAL, Fla. – Coupled Florida East Coast Railway, or FEC, locomotives No. 433 and No. 428 pass the Vehicle Assembly Building in Launch Complex 39 at NASA’s Kennedy Space Center in Florida on their way to NASA's Locomotive Maintenance Facility. Kennedy's Center Planning and Development Directorate has enlisted the locomotives to support a Rail Vibration Test for the Canaveral Port Authority. The purpose of the test is to collect amplitude, frequency and vibration test data utilizing two Florida East Coast locomotives operating on KSC tracks to ensure that future railroad operations will not affect launch vehicle processing at the center. Buildings instrumented for the test include the Rotation Processing Surge Facility, Thermal Protection Systems Facility, Vehicle Assembly Building, Orbiter Processing Facility and Booster Fabrication Facility. Photo credit: NASA/Daniel Casper
Design-Build Process for the Research Support Facility (RSF) (Book)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2012-06-01
An in-depth look at how the U.S. DOE and NREL used a performance-based design-build contract to build the Research Support Facility (RSF); one of the most energy efficient office buildings in the world.
Instructional Design and Directed Cognitive Processing.
ERIC Educational Resources Information Center
Bovy, Ruth Colvin
This paper argues that the information processing model provides a promising basis on which to build a comprehensive theory of instruction. Characteristics of the major information processing constructs are outlined including attention, encoding and rehearsal, working memory, long term memory, retrieval, and metacognitive processes, and a unifying…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scheib, J.; Pless, S.; Torcellini, P.
NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy usemore » requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.« less
NASA Astrophysics Data System (ADS)
Ocylok, Sörn; Alexeev, Eugen; Mann, Stefan; Weisheit, Andreas; Wissenbach, Konrad; Kelbassa, Ingomar
One major demand of today's laser metal deposition (LMD) processes is to achieve a fail-save build-up regarding changing conditions like heat accumulations. Especially for the repair of thin parts like turbine blades is the knowledge about the correlations between melt pool behavior and process parameters like laser power, feed rate and powder mass stream indispensable. The paper will show the process layout with the camera based coaxial monitoring system and the quantitative influence of the process parameters on the melt pool geometry. Therefore the diameter, length and area of the melt pool are measured by a video analytic system at various parameters and compared with the track wide in cross-sections and the laser spot diameter. The influence of changing process conditions on the melt pool is also investigated. On the base of these results an enhanced process of the build-up of a multilayer one track fillet geometry will be presented.
Landlab: A numerical modeling framework for evolving Earth surfaces from mountains to the coast
NASA Astrophysics Data System (ADS)
Gasparini, N. M.; Adams, J. M.; Tucker, G. E.; Hobley, D. E. J.; Hutton, E.; Istanbulluoglu, E.; Nudurupati, S. S.
2016-02-01
Landlab is an open-source, user-friendly, component-based modeling framework for exploring the evolution of Earth's surface. Landlab itself is not a model. Instead, it is a computational framework that facilitates the development of numerical models of coupled earth surface processes. The Landlab Python library includes a gridding engine and process components, along with support functions for tasks such as reading in DEM data and input variables, setting boundary conditions, and plotting and outputting data. Each user of Landlab builds his or her own unique model. The first step in building a Landlab model is generally initializing a grid, either regular (raster) or irregular (e.g. delaunay or radial), and process components. This initialization process involves reading in relevant parameter values and data. The process components act on the grid to alter grid properties over time. For example, a component exists that can track the growth, death, and succession of vegetation over time. There are also several components that evolve surface elevation, through processes such as fluvial sediment transport and linear diffusion, among others. Users can also build their own process components, taking advantage of existing functions in Landlab such as those that identify grid connectivity and calculate gradients and flux divergence. The general nature of the framework makes it applicable to diverse environments - from bedrock rivers to a pile of sand - and processes acting over a range of spatial and temporal scales. In this poster we illustrate how a user builds a model using Landlab and propose a number of ways in which Landlab can be applied in coastal environments - from dune migration to channelization of barrier islands. We seek input from the coastal community as to how the process component library can be expanded to explore the diverse phenomena that act to shape coastal environments.
The Building Commissioning Handbook.
ERIC Educational Resources Information Center
Heinz, John A.; Casault, Rick
This book discusses building commissioning, which is the process of certifying that a new facility meets the required specifications. As buildings have become more complex, the traditional methods for building start-up and final acceptance have been proven inadequate, and building commissioning has been developed, which often necessitates the use…
Building a competent health manager at district level: a grounded theory study from Eastern Uganda.
Tetui, Moses; Hurtig, Anna-Karin; Ekirpa-Kiracho, Elizabeth; Kiwanuka, Suzanne N; Coe, Anna-Britt
2016-11-21
Health systems in low-income countries are often characterized by poor health outcomes. While many reasons have been advanced to explain the persistently poor outcomes, management of the system has been found to play a key role. According to a WHO framework, the management of health systems is central to its ability to deliver needed health services. In this study, we examined how district managers in a rural setting in Uganda perceived existing approaches to strengthening management so as to provide a pragmatic and synergistic model for improving management capacity building. Twenty-two interviews were conducted with district level administrative and political managers, district level health managers and health facility managers to understand their perceptions and definitions of management and capacity building. Kathy Charmaz's constructive approach to grounded theory informed the data analysis process. An interative, dynamic and complex model with three sub-process of building a competent health manager was developed. A competent manager was understood as one who knew his/her roles, was well informed and was empowered to execute management functions. Professionalizing health managers which was viewed as the foundation, the use of engaging learning approaches as the inside contents and having a supportive work environment the frame of the model were the sub-processes involved in the model. The sub-processes were interconnected although the respondents agreed that having a supportive work environment was more time and effort intensive relative to the other two sub-processes. The model developed in our study makes four central contributions to enhance the WHO framework and the existing literature. First, it emphasizes management capacity building as an iterative, dynamic and complex process rather than a set of characteristics of competent managers. Second, our model suggests the need for professionalization of health managers at different levels of the health system. Third, our model underscores the benefits that could be accrued from the use of engaging learning approaches through prolonged and sustained processes that act in synergy. Lastly, our model postulates that different resource investments and a varied range of stakeholders could be required at each of the sub-processes.
TLS for generating multi-LOD of 3D building model
NASA Astrophysics Data System (ADS)
Akmalia, R.; Setan, H.; Majid, Z.; Suwardhi, D.; Chong, A.
2014-02-01
The popularity of Terrestrial Laser Scanners (TLS) to capture three dimensional (3D) objects has been used widely for various applications. Development in 3D models has also led people to visualize the environment in 3D. Visualization of objects in a city environment in 3D can be useful for many applications. However, different applications require different kind of 3D models. Since a building is an important object, CityGML has defined a standard for 3D building models at four different levels of detail (LOD). In this research, the advantages of TLS for capturing buildings and the modelling process of the point cloud can be explored. TLS will be used to capture all the building details to generate multi-LOD. This task, in previous works, involves usually the integration of several sensors. However, in this research, point cloud from TLS will be processed to generate the LOD3 model. LOD2 and LOD1 will then be generalized from the resulting LOD3 model. Result from this research is a guiding process to generate the multi-LOD of 3D building starting from LOD3 using TLS. Lastly, the visualization for multi-LOD model will also be shown.
Automated Classification of Heritage Buildings for As-Built Bim Using Machine Learning Techniques
NASA Astrophysics Data System (ADS)
Bassier, M.; Vergauwen, M.; Van Genechten, B.
2017-08-01
Semantically rich three dimensional models such as Building Information Models (BIMs) are increasingly used in digital heritage. They provide the required information to varying stakeholders during the different stages of the historic buildings life cyle which is crucial in the conservation process. The creation of as-built BIM models is based on point cloud data. However, manually interpreting this data is labour intensive and often leads to misinterpretations. By automatically classifying the point cloud, the information can be proccesed more effeciently. A key aspect in this automated scan-to-BIM process is the classification of building objects. In this research we look to automatically recognise elements in existing buildings to create compact semantic information models. Our algorithm efficiently extracts the main structural components such as floors, ceilings, roofs, walls and beams despite the presence of significant clutter and occlusions. More specifically, Support Vector Machines (SVM) are proposed for the classification. The algorithm is evaluated using real data of a variety of existing buildings. The results prove that the used classifier recognizes the objects with both high precision and recall. As a result, entire data sets are reliably labelled at once. The approach enables experts to better document and process heritage assets.
NASA Astrophysics Data System (ADS)
Lin, Feng; Chan, Carol K. K.
2018-04-01
This study examined the role of computer-supported knowledge-building discourse and epistemic reflection in promoting elementary-school students' scientific epistemology and science learning. The participants were 39 Grade 5 students who were collectively pursuing ideas and inquiry for knowledge advance using Knowledge Forum (KF) while studying a unit on electricity; they also reflected on the epistemic nature of their discourse. A comparison class of 22 students, taught by the same teacher, studied the same unit using the school's established scientific investigation method. We hypothesised that engaging students in idea-driven and theory-building discourse, as well as scaffolding them to reflect on the epistemic nature of their discourse, would help them understand their own scientific collaborative discourse as a theory-building process, and therefore understand scientific inquiry as an idea-driven and theory-building process. As hypothesised, we found that students engaged in knowledge-building discourse and reflection outperformed comparison students in scientific epistemology and science learning, and that students' understanding of collaborative discourse predicted their post-test scientific epistemology and science learning. To further understand the epistemic change process among knowledge-building students, we analysed their KF discourse to understand whether and how their epistemic practice had changed after epistemic reflection. The implications on ways of promoting epistemic change are discussed.
BUILDING PLANS OF FUEL STORAGE BUILDING (CPP603). INL DRAWING NUMBER ...
BUILDING PLANS OF FUEL STORAGE BUILDING (CPP-603). INL DRAWING NUMBER 200-0603-61-299-103029. ALTERNATE ID NUMBER 542-31-B-21. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
CALCIUM CHLORIDE PLANT LOOKING EAST. CALCIUM CHLORIDE BUILDING IN CENTER, ...
CALCIUM CHLORIDE PLANT LOOKING EAST. CALCIUM CHLORIDE BUILDING IN CENTER, CALCIUM CHLORIDE STORAGE BUILDING ON RIGHT WITH SA (SODA ASH) BUILDING IN RIGHT BACKGROUND. - Solvay Process Company, Calcium Chloride Plant, Between Willis & Milton Avenues, Solvay, Onondaga County, NY
Building trust and diversity in patient-centered oncology clinical trials: An integrated model.
Hurd, Thelma C; Kaplan, Charles D; Cook, Elise D; Chilton, Janice A; Lytton, Jay S; Hawk, Ernest T; Jones, Lovell A
2017-04-01
Trust is the cornerstone of clinical trial recruitment and retention. Efforts to decrease barriers and increase clinical trial participation among diverse populations have yielded modest results. There is an urgent need to better understand the complex interactions between trust and clinical trial participation. The process of trust-building has been a focus of intense research in the business community. Yet, little has been published about trust in oncology clinical trials or the process of building trust in clinical trials. Both clinical trials and business share common dimensions. Business strategies for building trust may be transferable to the clinical trial setting. This study was conducted to understand and utilize contemporary thinking about building trust to develop an Integrated Model of Trust that incorporates both clinical and business perspectives. A key word-directed literature search of the PubMed, Medline, Cochrane, and Google Search databases for entries dated between 1 January 1985 and 1 September 2015 was conducted to obtain information from which to develop an Integrated Model of Trust. Successful trial participation requires both participants and clinical trial team members to build distinctly different types of interpersonal trust to effect recruitment and retention. They are built under conditions of significant emotional stress and time constraints among people who do not know each other and have never worked together before. Swift Trust and Traditional Trust are sequentially built during the clinical trial process. Swift trust operates during the recruitment and very early active treatment phases of the clinical trial process. Traditional trust is built over time and operates during the active treatment and surveillance stages of clinical trials. The Psychological Contract frames the participants' and clinical trial team members' interpersonal trust relationship. The "terms" of interpersonal trust are negotiated through the psychological contract. Contract renegotiation occurs in response to cyclical changes within the trust relationship throughout trial participation. The Integrated Model of Trust offers a novel framework to interrogate the process by which diverse populations and clinical trial teams build trust. To our knowledge, this is the first model of trust-building in clinical trials that frames trust development through integrated clinical and business perspectives. By focusing on the process, rather than outcomes of trust-building diverse trial participants, clinical trials teams, participants, and cancer centers may be able to better understand, measure, and manage their trust relationships in real time. Ultimately, this may foster increased recruitment and retention of diverse populations to clinical trials.
Osman, Reham B; Alharbi, Nawal; Wismeijer, Daniel
The aim of this study was to evaluate the effect of the build orientation/build angle on the dimensional accuracy of full-coverage dental restorations manufactured using digital light-processing technology (DLP-AM). A full dental crown was digitally designed and 3D-printed using DLP-AM. Nine build angles were used: 90, 120, 135, 150, 180, 210, 225, 240, and 270 degrees. The specimens were digitally scanned using a high-resolution optical surface scanner (IScan D104i, Imetric). Dimensional accuracy was evaluated using the digital subtraction technique. The 3D digital files of the scanned printed crowns (test model) were exported in standard tessellation language (STL) format and superimposed on the STL file of the designed crown [reference model] using Geomagic Studio 2014 (3D Systems). The root mean square estimate (RMSE) values were evaluated, and the deviation patterns on the color maps were further assessed. The build angle influenced the dimensional accuracy of 3D-printed restorations. The lowest RMSE was recorded for the 135-degree and 210-degree build angles. However, the overall deviation pattern on the color map was more favorable with the 135-degree build angle in contrast with the 210-degree build angle where the deviation was observed around the critical marginal area. Within the limitations of this study, the recommended build angle using the current DLP system was 135 degrees. Among the selected build angles, it offers the highest dimensional accuracy and the most favorable deviation pattern. It also offers a self-supporting crown geometry throughout the building process.
Reactions of C1 Building Blocks
NASA Astrophysics Data System (ADS)
Stöcker, Michael
The chapter “Reactions of C1 Building Blocks” covers the direct conversion of methane to aromatics, the methanol-to-hydrocarbons (MTHC) conversion with respect to gasoline (methanol to gasoline) and olefins (methanol to olefins, methanol-to-propene) as well as some combinations like the TIGAS and Mobil's olefin-to-gasoline and distillate processes. The main focus within this chapter will be on the industrial processes, especially concerning the MTHC reactions - including catalytic systems, reaction conditions, process - and to a minor extent related to the mechanistic aspects and kinetic considerations.
PROCESS WATER BUILDING, TRA605, INTERIOR. FIRST FLOOR. CAMERA IS IN ...
PROCESS WATER BUILDING, TRA-605, INTERIOR. FIRST FLOOR. CAMERA IS IN SOUTHEAST CORNER AND FACES NORTHWEST. CONTROL ROOM AT RIGHT. CRANE MONORAIL IS OVER FLOOR HATCHES AND FLOOR OPENINGS. SIX VALVE HANDWHEELS ALONG FAR WALL IN LEFT CENTER VIEW. SEAL TANK IS ON OTHER SIDE OF WALL; PROCESS WATER PIPES ARE BELOW VALVE WHEELS. NOTE CURBS AROUND FLOOR OPENINGS. INL NEGATIVE NO. HD46-26-3. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
The lightbulb project: New music for new percussion instruments
NASA Astrophysics Data System (ADS)
Baumbusch, Brian
This thesis is about the process behind building, tuning, and composing music for a new set of metallophones called the "Lightbulb" instruments. This project began in 2011 and has continued to expand over the past two years: the first piece to be written for the instruments is titled Prana, and this thesis describes how the process of building and tuning the instruments informed the compositional process behind Prana. The premiere of Prana led to the formation of the Lightbulb Ensemble, which performs on these new instruments. The instruments and the group continue to develop.
ERIC Educational Resources Information Center
Ruh, Nina; Rahm, Benjamin; Unterrainer, Josef M.; Weiller, Cornelius; Kaller, Christoph P.
2012-01-01
In a companion study, eye-movement analyses in the Tower of London task (TOL) revealed independent indicators of functionally separable cognitive processes during problem solving, with processes of building up an internal representation of the problem preceding actual planning processes. These results imply that processes of internalization and…
Equipped for the Future Research Report: Building the Framework, 1993-1997. EFF Technical Report.
ERIC Educational Resources Information Center
Merrifield, Juliet
This report focuses on the research aspects of the Equipped for the Future (EFF) project that works toward system reform for adult literacy and lifelong learning. Section 1 describes the EFF process 1993-97, the impetus for EFF, and approaches to system reform. Section 2 explores the research processes EFF uses to build a framework that could…
The AskA Starter Kit: How To Build and Maintain Digital Reference Services.
ERIC Educational Resources Information Center
Lankes, R. David; Kasowitz, Abby S.
This Starter Kit is designed to help organizations and individuals who wish to offer human-mediated information services via the Internet to users in the K-12 community. A six-step process is proposed for organizations to follow in creating an "AskA" service. This process addresses all aspects involved in building and maintaining an AskA…
ERIC Educational Resources Information Center
Leeuwis, Cees
2004-01-01
Building on the tradition of agricultural extension, this article discusses several changes in thinking regarding the relations between communication and innovation. Starting from the idea that network building, social learning and conflict management are key processes to be supported by communication professionals, the article makes critical…
Understanding product cost vs. performance through an in-depth system Monte Carlo analysis
NASA Astrophysics Data System (ADS)
Sanson, Mark C.
2017-08-01
The manner in which an optical system is toleranced and compensated greatly affects the cost to build it. By having a detailed understanding of different tolerance and compensation methods, the end user can decide on the balance of cost and performance. A detailed phased approach Monte Carlo analysis can be used to demonstrate the tradeoffs between cost and performance. In complex high performance optical systems, performance is fine-tuned by making adjustments to the optical systems after they are initially built. This process enables the overall best system performance, without the need for fabricating components to stringent tolerance levels that often can be outside of a fabricator's manufacturing capabilities. A good performance simulation of as built performance can interrogate different steps of the fabrication and build process. Such a simulation may aid the evaluation of whether the measured parameters are within the acceptable range of system performance at that stage of the build process. Finding errors before an optical system progresses further into the build process saves both time and money. Having the appropriate tolerances and compensation strategy tied to a specific performance level will optimize the overall product cost.
Materials and Process Activities for NASA's Composite Crew Module
NASA Technical Reports Server (NTRS)
Polis, Daniel L.
2012-01-01
In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center (NESC) to design, build, and test a full-scale Composite Crew Module (CCM). The overall goal of the CCM project was to develop a team from the NASA family with hands-on experience in composite design, manufacturing, and testing in anticipation of future space exploration systems being made of composite materials. The CCM project was planned to run concurrently with the Orion project s baseline metallic design within the Constellation Program so that features could be compared and discussed without inducing risk to the overall Program. The materials and process activities were prioritized based on a rapid prototype approach. This approach focused developmental activities on design details with greater risk and uncertainty, such as out-of-autoclave joining, over some of the more traditional lamina and laminate building block levels. While process development and associated building block testing were performed, several anomalies were still observed at the full-scale level due to interactions between process robustness and manufacturing scale-up. This paper describes the process anomalies that were encountered during the CCM development and the subsequent root cause investigations that led to the final design solutions. These investigations highlight the importance of full-scale developmental work early in the schedule of a complex composite design/build project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Yixing; Zhang, Jianshun; Pelken, Michael
Executive Summary The objective of this study was to develop a “Virtual Design Studio (VDS)”: a software platform for integrated, coordinated and optimized design of green building systems with low energy consumption, high indoor environmental quality (IEQ), and high level of sustainability. This VDS is intended to assist collaborating architects, engineers and project management team members throughout from the early phases to the detailed building design stages. It can be used to plan design tasks and workflow, and evaluate the potential impacts of various green building strategies on the building performance by using the state of the art simulation toolsmore » as well as industrial/professional standards and guidelines for green building system design. Engaged in the development of VDS was a multi-disciplinary research team that included architects, engineers, and software developers. Based on the review and analysis of how existing professional practices in building systems design operate, particularly those used in the U.S., Germany and UK, a generic process for performance-based building design, construction and operation was proposed. It distinguishes the whole process into five distinct stages: Assess, Define, Design, Apply, and Monitoring (ADDAM). The current VDS is focused on the first three stages. The VDS considers building design as a multi-dimensional process, involving multiple design teams, design factors, and design stages. The intersection among these three dimensions defines a specific design task in terms of “who”, “what” and “when”. It also considers building design as a multi-objective process that aims to enhance the five aspects of performance for green building systems: site sustainability, materials and resource efficiency, water utilization efficiency, energy efficiency and impacts to the atmospheric environment, and IEQ. The current VDS development has been limited to energy efficiency and IEQ performance, with particular focus on evaluating thermal performance, air quality and lighting environmental quality because of their strong interaction with the energy performance of buildings. The VDS software framework contains four major functions: 1) Design coordination: It enables users to define tasks using the Input-Process-Output flow approach, which specifies the anticipated activities (i.e., the process), required input and output information, and anticipated interactions with other tasks. It also allows task scheduling to define the work flow, and sharing of the design data and information via the internet. 2) Modeling and simulation: It enables users to perform building simulations to predict the energy consumption and IEQ conditions at any of the design stages by using EnergyPlus and a combined heat, air, moisture and pollutant simulation (CHAMPS) model. A method for co-simulation was developed to allow the use of both models at the same time step for the combined energy and indoor air quality analysis. 3) Results visualization: It enables users to display a 3-D geometric design of the building by reading BIM (building information model) file generated by design software such as SketchUp, and the predicted results of heat, air, moisture, pollutant and light distributions in the building. 4) Performance evaluation: It enables the users to compare the performance of a proposed building design against a reference building that is defined for the same type of buildings under the same climate condition, and predicts the percent of improvements over the minimum requirements specified in ASHRAE Standard 55-2010, 62.1-2010 and 90.1-2010. An approach was developed to estimate the potential impact of a design factor on the whole building performance, and hence can assist the user to identify areas that have most pay back for investment. The VDS software was developed by using C++ with the conventional Model, View and Control (MVC) software architecture. The software has been verified by using a simple 3-zone case building. The application of the VDS concepts and framework for building design and performance analysis has been illustrated by using a medium-sized, five story office building that received LEED Platinum Certification from USGBC.« less
All for one and one for all: team building and nursing.
Ryan, T
1994-05-01
Nursing care provision has become increasingly complex with the growth of health care systems in recent years. This has resulted in a greater emphasis upon the use of team approaches to providing care. This paper explores the nature of teams within nursing and how they can be developed. The membership of nursing teams and the differences between the type of teams is also examined. The process of team building in nursing teams and the way that induction programmes can play a part in this team building process is also discussed.
2012-02-17
Industrial Area Construction: Located 5 miles south of Launch Complex 39, construction of the main buildings -- Operations and Checkout Building, Headquarters Building, and Central Instrumentation Facility – began in 1963. In 1992, the Space Station Processing Facility was designed and constructed for the pre-launch processing of International Space Station hardware that was flown on the space shuttle. Along with other facilities, the industrial area provides spacecraft assembly and checkout, crew training, computer and instrumentation equipment, hardware preflight testing and preparations, as well as administrative offices. Poster designed by Kennedy Space Center Graphics Department/Greg Lee. Credit: NASA
Managed traffic evacuation using distributed sensor processing
NASA Astrophysics Data System (ADS)
Ramuhalli, Pradeep; Biswas, Subir
2005-05-01
This paper presents an integrated sensor network and distributed event processing architecture for managed in-building traffic evacuation during natural and human-caused disasters, including earthquakes, fire and biological/chemical terrorist attacks. The proposed wireless sensor network protocols and distributed event processing mechanisms offer a new distributed paradigm for improving reliability in building evacuation and disaster management. The networking component of the system is constructed using distributed wireless sensors for measuring environmental parameters such as temperature, humidity, and detecting unusual events such as smoke, structural failures, vibration, biological/chemical or nuclear agents. Distributed event processing algorithms will be executed by these sensor nodes to detect the propagation pattern of the disaster and to measure the concentration and activity of human traffic in different parts of the building. Based on this information, dynamic evacuation decisions are taken for maximizing the evacuation speed and minimizing unwanted incidents such as human exposure to harmful agents and stampedes near exits. A set of audio-visual indicators and actuators are used for aiding the automated evacuation process. In this paper we develop integrated protocols, algorithms and their simulation models for the proposed sensor networking and the distributed event processing framework. Also, efficient harnessing of the individually low, but collectively massive, processing abilities of the sensor nodes is a powerful concept behind our proposed distributed event processing algorithms. Results obtained through simulation in this paper are used for a detailed characterization of the proposed evacuation management system and its associated algorithmic components.
Geometric Model of Induction Heating Process of Iron-Based Sintered Materials
NASA Astrophysics Data System (ADS)
Semagina, Yu V.; Egorova, M. A.
2018-03-01
The article studies the issue of building multivariable dependences based on the experimental data. A constructive method for solving the issue is presented in the form of equations of (n-1) – surface compartments of the extended Euclidean space E+n. The dimension of space is taken to be equal to the sum of the number of parameters and factors of the model of the system being studied. The basis for building multivariable dependencies is the generalized approach to n-space used for the surface compartments of 3D space. The surface is designed on the basis of the kinematic method, moving one geometric object along a certain trajectory. The proposed approach simplifies the process aimed at building the multifactorial empirical dependencies which describe the process being investigated.
Model-based tomographic reconstruction
Chambers, David H; Lehman, Sean K; Goodman, Dennis M
2012-06-26
A model-based approach to estimating wall positions for a building is developed and tested using simulated data. It borrows two techniques from geophysical inversion problems, layer stripping and stacking, and combines them with a model-based estimation algorithm that minimizes the mean-square error between the predicted signal and the data. The technique is designed to process multiple looks from an ultra wideband radar array. The processed signal is time-gated and each section processed to detect the presence of a wall and estimate its position, thickness, and material parameters. The floor plan of a building is determined by moving the array around the outside of the building. In this paper we describe how the stacking and layer stripping algorithms are combined and show the results from a simple numerical example of three parallel walls.
Building Cognition: The Construction of Computational Representations for Scientific Discovery.
Chandrasekharan, Sanjay; Nersessian, Nancy J
2015-11-01
Novel computational representations, such as simulation models of complex systems and video games for scientific discovery (Foldit, EteRNA etc.), are dramatically changing the way discoveries emerge in science and engineering. The cognitive roles played by such computational representations in discovery are not well understood. We present a theoretical analysis of the cognitive roles such representations play, based on an ethnographic study of the building of computational models in a systems biology laboratory. Specifically, we focus on a case of model-building by an engineer that led to a remarkable discovery in basic bioscience. Accounting for such discoveries requires a distributed cognition (DC) analysis, as DC focuses on the roles played by external representations in cognitive processes. However, DC analyses by and large have not examined scientific discovery, and they mostly focus on memory offloading, particularly how the use of existing external representations changes the nature of cognitive tasks. In contrast, we study discovery processes and argue that discoveries emerge from the processes of building the computational representation. The building process integrates manipulations in imagination and in the representation, creating a coupled cognitive system of model and modeler, where the model is incorporated into the modeler's imagination. This account extends DC significantly, and we present some of the theoretical and application implications of this extended account. Copyright © 2014 Cognitive Science Society, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rigsby V.P.
2009-02-12
In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitatemore » the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005); and Waste Handling Plan for Building K-25 West Wing Process Equipment and Piping at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008b).« less
The assembly and disassembly of ecological networks.
Bascompte, Jordi; Stouffer, Daniel B
2009-06-27
Global change has created a severe biodiversity crisis. Species are driven extinct at an increasing rate, and this has the potential to cause further coextinction cascades. The rate and shape of these coextinction cascades depend very much on the structure of the networks of interactions across species. Understanding network structure and how it relates to network disassembly, therefore, is a priority for system-level conservation biology. This process of network collapse may indeed be related to the process of network build-up, although very little is known about both processes and even less about their relationship. Here we review recent work that provides some preliminary answers to these questions. First, we focus on network assembly by emphasizing temporal processes at the species level, as well as the structural building blocks of complex ecological networks. Second, we focus on network disassembly as a consequence of species extinctions or habitat loss. We conclude by emphasizing some general rules of thumb that can help in building a comprehensive framework to understand the responses of ecological networks to global change.
Kumar, Sameer
2011-01-01
It is increasingly recognized that hospital operation is an intricate system with limited resources and many interacting sources of both positive and negative feedback. The purpose of this study is to design a surgical delivery process in a county hospital in the U.S where patient flow through a surgical ward is optimized. The system simulation modeling is used to address questions of capacity planning, throughput management and interacting resources which constitute the constantly changing complexity that characterizes designing a contemporary surgical delivery process in a hospital. The steps in building a system simulation model is demonstrated using an example of building a county hospital in a small city in the US. It is used to illustrate a modular system simulation modeling of patient surgery process flows. The system simulation model development will enable planners and designers how they can build in overall efficiencies in a healthcare facility through optimal bed capacity for peak patient flow of emergency and routine patients.
Walter, Alexander I; Helgenberger, Sebastian; Wiek, Arnim; Scholz, Roland W
2007-11-01
Most Transdisciplinary Research (TdR) projects combine scientific research with the building of decision making capacity for the involved stakeholders. These projects usually deal with complex, societally relevant, real-world problems. This paper focuses on TdR projects, which integrate the knowledge of researchers and stakeholders in a collaborative transdisciplinary process through structured methods of mutual learning. Previous research on the evaluation of TdR has insufficiently explored the intended effects of transdisciplinary processes on the real world (societal effects). We developed an evaluation framework for assessing the societal effects of transdisciplinary processes. Outputs (measured as procedural and product-related involvement of the stakeholders), impacts (intermediate effects connecting outputs and outcomes) and outcomes (enhanced decision making capacity) are distinguished as three types of societal effects. Our model links outputs and outcomes of transdisciplinary processes via the impacts using a mediating variables approach. We applied this model in an ex post evaluation of a transdisciplinary process. 84 out of 188 agents participated in a survey. The results show significant mediation effects of the two impacts "network building" and "transformation knowledge". These results indicate an influence of a transdisciplinary process on the decision making capacity of stakeholders, especially through social network building and the generation of knowledge relevant for action.
CALCIUM CHLORIDE PLANT LOOKING EAST. CALCIUM CHLORIDE BUILDING ON LEFT, ...
CALCIUM CHLORIDE PLANT LOOKING EAST. CALCIUM CHLORIDE BUILDING ON LEFT, CALCIUM CHLORIDE STORAGE BUILDING ON RIGHT OF CENTER WITH TOP OF SA (SODA ASH) BUILDING IN RIGHT BACKGROUND. - Solvay Process Company, Calcium Chloride Plant, Between Willis & Milton Avenues, Solvay, Onondaga County, NY
Comparative study of building footprint estimation methods from LiDAR point clouds
NASA Astrophysics Data System (ADS)
Rozas, E.; Rivera, F. F.; Cabaleiro, J. C.; Pena, T. F.; Vilariño, D. L.
2017-10-01
Building area calculation from LiDAR points is still a difficult task with no clear solution. Their different characteristics, such as shape or size, have made the process too complex to automate. However, several algorithms and techniques have been used in order to obtain an approximated hull. 3D-building reconstruction or urban planning are examples of important applications that benefit of accurate building footprint estimations. In this paper, we have carried out a study of accuracy in the estimation of the footprint of buildings from LiDAR points. The analysis focuses on the processing steps following the object recognition and classification, assuming that labeling of building points have been previously performed. Then, we perform an in-depth analysis of the influence of the point density over the accuracy of the building area estimation. In addition, a set of buildings with different size and shape were manually classified, in such a way that they can be used as benchmark.
The role of the clinical engineer in the design of new hospitals.
Decouvelaere, M; Berrard, E; Fabrega, D
2007-01-01
Hospital construction projects take place over several years, from the initial decision to build to their completion and start of service. The owner and his building and civil engineering department have to face many administrative processes and complex techniques. It is the role of the clinical engineer to furnish the new structure with medical equipment, by integrating the constraints of these devices in the building. At each stage of the building process, the clinical engineer must contribute to a specific mission of interface between the building and the equipment, identifying and anticipating constraints, and taking care of the good preparation of the integration of this equipment in existing buildings or buildings yet to be created. If the objective of optimal compatibility between the building and its equipment is not reached, then adaptations will have to be carried out either in progress, or after the completion of work, and will be opposed to the factors of success implemented by the actors.
VIEW LOOKING EAST, SA WETSIDE (DISTILLATION BUILDING) ON THE RIGHT, ...
VIEW LOOKING EAST, SA WETSIDE (DISTILLATION BUILDING) ON THE RIGHT, STD (SODA TOWER DRYERS?), SA DRYSIDE ON RIGHT. BEHIND STD BUILDING IS SHD BUILDING (SODA HORIZONTAL DRYERS?) THE ENTIRE DRYING COMPLEX WAS KNOWN AS THE DRYSIDE. - Solvay Process Company, SA Wetside Building, Between Willis & Milton Avenue, Solvay, Onondaga County, NY
Bazyk, Susan; Demirjian, Louise; LaGuardia, Teri; Thompson-Repas, Karen; Conway, Carol; Michaud, Paula
2015-01-01
We explored the meaning and outcomes of a 6-mo building capacity process designed to promote knowledge translation of a public health approach to mental health among pediatric occupational therapy practitioners participating in a Community of Practice. A one-group (N = 117) mixed-methods design using a pretest-posttest survey and qualitative analysis of written reflections was used to explore the meaning and outcomes of the building capacity process. Statistically significant improvements (p < .02) in pretest-posttest scores of knowledge, beliefs, and actions related to a public health approach to mental health were found. Qualitative findings suggest that participation resulted in a renewed commitment to addressing children's mental health. The building capacity process expanded practitioner knowledge, renewed energy, and promoted confidence, resulting in change leaders empowered to articulate, advocate for, and implement practice changes reflecting occupational therapy's role in addressing children's mental health. Copyright © 2015 by the American Occupational Therapy Association, Inc.
Demirjian, Louise; LaGuardia, Teri; Thompson-Repas, Karen; Conway, Carol; Michaud, Paula
2015-01-01
PURPOSE. We explored the meaning and outcomes of a 6-mo building capacity process designed to promote knowledge translation of a public health approach to mental health among pediatric occupational therapy practitioners participating in a Community of Practice. METHOD. A one-group (N = 117) mixed-methods design using a pretest–posttest survey and qualitative analysis of written reflections was used to explore the meaning and outcomes of the building capacity process. RESULTS. Statistically significant improvements (p < .02) in pretest–posttest scores of knowledge, beliefs, and actions related to a public health approach to mental health were found. Qualitative findings suggest that participation resulted in a renewed commitment to addressing children’s mental health. CONCLUSION. The building capacity process expanded practitioner knowledge, renewed energy, and promoted confidence, resulting in change leaders empowered to articulate, advocate for, and implement practice changes reflecting occupational therapy’s role in addressing children’s mental health. PMID:26565099
Carter, Tony
2007-01-01
To build this process it is necessary to consult customers for preferences, build familiarity and knowledge to build a relationship and conduct business in a customized fashion. The process takes every opportunity to build customer satisfaction with each customer contact. It is an important process to have, since customers today are more demanding, sophisticated, educated and comfortable speaking to the company as an equal (Belk, 2003). Customers have more customized expectations so they want to be reached as individuals (Raymond and Tanner, 1994). Also, a disproportionate search for new business is costly. The cost to cultivate new customers is more than maintaining existing customers (Cathcart, 1990). Other reasons that customer retention is necessary is because many unhappy customers will never buy again from a company that dissatisfied them and they will communicate their displeasure to other people. These dissatisfied customers may not even convey their displeasure but without saying anything just stop doing business with that company, which may keep them unaware for some time that there is any problem (Cathcart, 1990).
Research on construction quality and improvement of assembly construction
NASA Astrophysics Data System (ADS)
Cheng, Fei
2017-11-01
Based on the acceleration of the urbanization process and the improvement of the quality of life of our residents, the demand for building construction has been increasing. In this context, the construction industry in order to promote the construction efficiency, quality improvement, to meet the needs of the development of the times to strengthen the new technology, the use of new technologies. At present, China’s engineering construction units in the process of carrying out the project to strengthen the use of assembly-type construction technology, which thus achieved for the traditional construction work low-level, high time-consuming issues, and promote the steady improvement of production efficiency. Based on this, this paper focuses on the analysis of the connotation of the assembly structure and analyzes the quality problems in the construction process of the construction projects and puts forward the improvement measures to promote the improvement of the building quality and the construction of the building Construction speed. Based on this, this paper analyzes the structural system and design of prefabricated building.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2014-09-01
This brochure addresses gaps in actionable knowledge that can help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. This brochure should be used to make these decisions so systems can operate more energy efficiently; upfront capital costs will also decrease. This information can also be used to drive changes in negotiations about PPL energy demands. It should enable brokers and tenants to agree about lower PPL capacities. Owner-occupied buildings will also benefit.more » Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems.« less
Group facilitation: building that winning team.
Krumberger, J M
1992-12-01
Team building does not occur by chance; it involves using techniques to make it easier for members to contribute their expertise while working with others to achieve quality results. Evaluation of team effectiveness involves assessing both the processes (team interactions and work processes) and accomplishment of goals (out-comes; see box). Productivity and quality that could not be accomplished by individual efforts may be enhanced by effectively working teams.
Nelson, T.I.; Bolen, W.P.
2007-01-01
Construction aggregates, primarily stone, sand and gravel, are recovered from widespread naturally occurring mineral deposits and processed for use primarily in the construction industry. They are mined, crushed, sorted by size and sold loose or combined with portland cement or asphaltic cement to make concrete products to build roads, houses, buildings, and other structures. Much smaller quantities are used in agriculture, cement manufacture, chemical and metallurgical processes, glass production and many other products.
How to Build the Master Schedule in 10 Easy Steps: A Guide for Secondary School Administrators
ERIC Educational Resources Information Center
Kussin, Steven S.
2007-01-01
This book is an incredibly valuable resource to anyone involved in building a master schedule. The author provides a comprehensive description of the processes involved and makes the reader aware of what needs to be considered and done throughout the process. One of the most time-consuming tasks for school leaders is creating a master schedule…
Raymond, Nancy C; Wyman, Jean F; Dighe, Satlaj; Harwood, Eileen M; Hang, Mikow
2018-06-01
Process evaluation is an important tool in quality improvement efforts. This article illustrates how a systematic and continuous evaluation process can be used to improve the quality of faculty career development programs by using the University of Minnesota's Building Interdisciplinary Research Careers in Women's Health (BIRCWH) K12 program as an exemplar. Data from a rigorous process evaluation incorporating quantitative and qualitative measurements were analyzed and reviewed by the BIRCWH program leadership on a regular basis. Examples are provided of how this evaluation model and processes were used to improve many aspects of the program, thereby improving scholar, mentor, and advisory committee members' satisfaction and scholar outcomes. A rigorous evaluation plan can increase the effectiveness and impact of a research career development plan.
Building asynchronous geospatial processing workflows with web services
NASA Astrophysics Data System (ADS)
Zhao, Peisheng; Di, Liping; Yu, Genong
2012-02-01
Geoscience research and applications often involve a geospatial processing workflow. This workflow includes a sequence of operations that use a variety of tools to collect, translate, and analyze distributed heterogeneous geospatial data. Asynchronous mechanisms, by which clients initiate a request and then resume their processing without waiting for a response, are very useful for complicated workflows that take a long time to run. Geospatial contents and capabilities are increasingly becoming available online as interoperable Web services. This online availability significantly enhances the ability to use Web service chains to build distributed geospatial processing workflows. This paper focuses on how to orchestrate Web services for implementing asynchronous geospatial processing workflows. The theoretical bases for asynchronous Web services and workflows, including asynchrony patterns and message transmission, are examined to explore different asynchronous approaches to and architecture of workflow code for the support of asynchronous behavior. A sample geospatial processing workflow, issued by the Open Geospatial Consortium (OGC) Web Service, Phase 6 (OWS-6), is provided to illustrate the implementation of asynchronous geospatial processing workflows and the challenges in using Web Services Business Process Execution Language (WS-BPEL) to develop them.
Energy-efficient hierarchical processing in the network of wireless intelligent sensors (WISE)
NASA Astrophysics Data System (ADS)
Raskovic, Dejan
Sensor network nodes have benefited from technological advances in the field of wireless communication, processing, and power sources. However, the processing power of microcontrollers is often not sufficient to perform sophisticated processing, while the power requirements of digital signal processing boards or handheld computers are usually too demanding for prolonged system use. We are matching the intrinsic hierarchical nature of many digital signal-processing applications with the natural hierarchy in distributed wireless networks, and building the hierarchical system of wireless intelligent sensors. Our goal is to build a system that will exploit the hierarchical organization to optimize the power consumption and extend battery life for the given time and memory constraints, while providing real-time processing of sensor signals. In addition, we are designing our system to be able to adapt to the current state of the environment, by dynamically changing the algorithm through procedure replacement. This dissertation presents the analysis of hierarchical environment and methods for energy profiling used to evaluate different system design strategies, and to optimize time-effective and energy-efficient processing.
Building Assessment Survey and Evaluation Study: Quality Assurance Project Plan
This supplement describes QA/QC aspects of the implementation of the Office of Radiation and Indoor Air's BASE protocol including: recruitment of study buildings, execution of field studies in each building, and the processing and coordination of each building's ata for final submittal to EPA.
Modeling of microstructure evolution in direct metal laser sintering: A phase field approach
NASA Astrophysics Data System (ADS)
Nandy, Jyotirmoy; Sarangi, Hrushikesh; Sahoo, Seshadev
2017-02-01
Direct Metal Laser Sintering (DMLS) is a new technology in the field of additive manufacturing, which builds metal parts in a layer by layer fashion directly from the powder bed. The process occurs within a very short time period with rapid solidification rate. Slight variations in the process parameters may cause enormous change in the final build parts. The physical and mechanical properties of the final build parts are dependent on the solidification rate which directly affects the microstructure of the material. Thus, the evolving of microstructure plays a vital role in the process parameters optimization. Nowadays, the increase in computational power allows for direct simulations of microstructures during materials processing for specific manufacturing conditions. In this study, modeling of microstructure evolution of Al-Si-10Mg powder in DMLS process was carried out by using a phase field approach. A MATLAB code was developed to solve the set of phase field equations, where simulation parameters include temperature gradient, laser scan speed and laser power. The effects of temperature gradient on microstructure evolution were studied and found that with increase in temperature gradient, the dendritic tip grows at a faster rate.
Safe to Fly: Certifying COTS Hardware for Spaceflight
NASA Technical Reports Server (NTRS)
Fichuk, Jessica L.
2011-01-01
Providing hardware for the astronauts to use on board the Space Shuttle or International Space Station (ISS) involves a certification process that entails evaluating hardware safety, weighing risks, providing mitigation, and verifying requirements. Upon completion of this certification process, the hardware is deemed safe to fly. This process from start to finish can be completed as quickly as 1 week or can take several years in length depending on the complexity of the hardware and whether the item is a unique custom design. One area of cost and schedule savings that NASA implements is buying Commercial Off the Shelf (COTS) hardware and certifying it for human spaceflight as safe to fly. By utilizing commercial hardware, NASA saves time not having to develop, design and build the hardware from scratch, as well as a timesaving in the certification process. By utilizing COTS hardware, the current detailed certification process can be simplified which results in schedule savings. Cost savings is another important benefit of flying COTS hardware. Procuring COTS hardware for space use can be more economical than custom building the hardware. This paper will investigate the cost savings associated with certifying COTS hardware to NASA s standards rather than performing a custom build.
Part height control of laser metal additive manufacturing process
NASA Astrophysics Data System (ADS)
Pan, Yu-Herng
Laser Metal Deposition (LMD) has been used to not only make but also repair damaged parts in a layer-by-layer fashion. Parts made in this manner may produce less waste than those made through conventional machining processes. However, a common issue of LMD involves controlling the deposition's layer thickness. Accuracy is important, and as it increases, both the time required to produce the part and the material wasted during the material removal process (e.g., milling, lathe) decrease. The deposition rate is affected by multiple parameters, such as the powder feed rate, laser input power, axis feed rate, material type, and part design, the values of each of which may change during the LMD process. Using a mathematical model to build a generic equation that predicts the deposition's layer thickness is difficult due to these complex parameters. In this thesis, we propose a simple method that utilizes a single device. This device uses a pyrometer to monitor the current build height, thereby allowing the layer thickness to be controlled during the LMD process. This method also helps the LMD system to build parts even with complex parameters and to increase material efficiency.
Translating building information modeling to building energy modeling using model view definition.
Jeong, WoonSeong; Kim, Jong Bum; Clayton, Mark J; Haberl, Jeff S; Yan, Wei
2014-01-01
This paper presents a new approach to translate between Building Information Modeling (BIM) and Building Energy Modeling (BEM) that uses Modelica, an object-oriented declarative, equation-based simulation environment. The approach (BIM2BEM) has been developed using a data modeling method to enable seamless model translations of building geometry, materials, and topology. Using data modeling, we created a Model View Definition (MVD) consisting of a process model and a class diagram. The process model demonstrates object-mapping between BIM and Modelica-based BEM (ModelicaBEM) and facilitates the definition of required information during model translations. The class diagram represents the information and object relationships to produce a class package intermediate between the BIM and BEM. The implementation of the intermediate class package enables system interface (Revit2Modelica) development for automatic BIM data translation into ModelicaBEM. In order to demonstrate and validate our approach, simulation result comparisons have been conducted via three test cases using (1) the BIM-based Modelica models generated from Revit2Modelica and (2) BEM models manually created using LBNL Modelica Buildings library. Our implementation shows that BIM2BEM (1) enables BIM models to be translated into ModelicaBEM models, (2) enables system interface development based on the MVD for thermal simulation, and (3) facilitates the reuse of original BIM data into building energy simulation without an import/export process.
Translating Building Information Modeling to Building Energy Modeling Using Model View Definition
Kim, Jong Bum; Clayton, Mark J.; Haberl, Jeff S.
2014-01-01
This paper presents a new approach to translate between Building Information Modeling (BIM) and Building Energy Modeling (BEM) that uses Modelica, an object-oriented declarative, equation-based simulation environment. The approach (BIM2BEM) has been developed using a data modeling method to enable seamless model translations of building geometry, materials, and topology. Using data modeling, we created a Model View Definition (MVD) consisting of a process model and a class diagram. The process model demonstrates object-mapping between BIM and Modelica-based BEM (ModelicaBEM) and facilitates the definition of required information during model translations. The class diagram represents the information and object relationships to produce a class package intermediate between the BIM and BEM. The implementation of the intermediate class package enables system interface (Revit2Modelica) development for automatic BIM data translation into ModelicaBEM. In order to demonstrate and validate our approach, simulation result comparisons have been conducted via three test cases using (1) the BIM-based Modelica models generated from Revit2Modelica and (2) BEM models manually created using LBNL Modelica Buildings library. Our implementation shows that BIM2BEM (1) enables BIM models to be translated into ModelicaBEM models, (2) enables system interface development based on the MVD for thermal simulation, and (3) facilitates the reuse of original BIM data into building energy simulation without an import/export process. PMID:25309954
Field Trial of an Aerosol-Based Enclosure Sealing Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harrington, Curtis; Springer, David
2015-09-01
This report presents the results from several demonstrations of a new method for sealing building envelope air leaks using an aerosol sealing process developed by the Western Cooling Efficiency Center at UC Davis. The process involves pressurizing a building while applying an aerosol sealant to the interior. As air escapes through leaks in the building envelope, the aerosol particles are transported to the leaks where they collect and form a seal that blocks the leak. Standard blower door technology is used to facilitate the building pressurization, which allows the installer to track the sealing progress during the installation and automaticallymore » verify the final building tightness. Each aerosol envelope sealing installation was performed after drywall was installed and taped, and the process did not appear to interrupt the construction schedule or interfere with other trades working in the homes. The labor needed to physically seal bulk air leaks in typical construction will not be replaced by this technology. However, this technology is capable of bringing the air leakage of a building that was built with standard construction techniques and HERS-verified sealing down to levels that would meet DOE Zero Energy Ready Homes program requirements. When a developer is striving to meet a tighter envelope leakage specification, this technology could greatly reduce the cost to achieve that goal by providing a simple and relatively low cost method for reducing the air leakage of a building envelope with little to no change in their common building practices.« less
Architectural design of the science complex at Elizabeth City State University
NASA Technical Reports Server (NTRS)
Jahromi, Soheila
1993-01-01
This paper gives an overall view of the architectural design process and elements in taking an idea from conception to execution. The project presented is an example for this process. Once the need for a new structure is established, an architect studies the requirements, opinions and limits in creating a structure that people will exist in, move through, and use. Elements in designing a building include factors such as volume and surface, light and form changes of scale and view, movement and stasis. Some of the other factors are functions and physical conditions of construction. Based on experience, intuition, and boundaries, an architect will utilize all elements in creating a new building. In general, the design process begins with studying the spatial needs which develop into an architectural program. A comprehensive and accurate architectural program is essential for having a successful building. The most attractive building which does not meet the functional needs of its users has failed at the primary reason for its existence. To have a good program an architect must have a full understanding of the daily functions that will take place in the building. The architectural program along with site characteristics are among a few of the important guidelines in studying the form, adjacencies, and circulation for the structure itself and also in relation to the adjacent structures. Conceptual studies are part of the schematic design, which is the first milestone in the design process. The other reference points are design development and construction documents. At each milestone, review and coordination with all the consultants is established, and the user is essential in refining the project. In design development phase, conceptual diagrams take shape, and architectural, structural, mechanical, and electrical systems are developed. The final phase construction documents convey all the information required to construct the building. The design process and elements described were applied in the following project.
2014-09-25
CAPE CANAVERAL, Fla. – Coupled Florida East Coast Railway, or FEC, locomotives No. 433 and No. 428 make the first run past the Orbiter Processing Facility and Thermal Protection System Facility in Launch Complex 39 at NASA’s Kennedy Space Center in Florida during the Rail Vibration Test for the Canaveral Port Authority. Seismic monitors are collecting data as the train passes by. The purpose of the test is to collect amplitude, frequency and vibration test data utilizing two Florida East Coast locomotives operating on KSC tracks to ensure that future railroad operations will not affect launch vehicle processing at the center. Buildings instrumented for the test include the Rotation Processing Surge Facility, Thermal Protection Systems Facility, Vehicle Assembly Building, Orbiter Processing Facility and Booster Fabrication Facility. Photo credit: NASA/Daniel Casper
Materials Characterization of Additively Manufactured Components for Rocket Propulsion
NASA Technical Reports Server (NTRS)
Carter, Robert; Draper, Susan; Locci, Ivan; Lerch, Bradley; Ellis, David; Senick, Paul; Meyer, Michael; Free, James; Cooper, Ken; Jones, Zachary
2015-01-01
To advance Additive Manufacturing (AM) technologies for production of rocket propulsion components the NASA Glenn Research Center (GRC) is applying state of the art characterization techniques to interrogate microstructure and mechanical properties of AM materials and components at various steps in their processing. The materials being investigated for upper stage rocket engines include titanium, copper, and nickel alloys. Additive manufacturing processes include laser powder bed, electron beam powder bed, and electron beam wire fed processes. Various post build thermal treatments, including Hot Isostatic Pressure (HIP), have been studied to understand their influence on microstructure, mechanical properties, and build density. Micro-computed tomography, electron microscopy, and mechanical testing in relevant temperature environments has been performed to develop relationships between build quality, microstructure, and mechanical performance at temperature. A summary of GRC's Additive Manufacturing roles and experimental findings will be presented.
Material Characterization of Additively Manufactured Components for Rocket Propulsion
NASA Technical Reports Server (NTRS)
Carter, Robert; Draper, Susan; Locci, Ivan; Lerch, Bradley; Ellis, David; Senick, Paul; Meyer, Michael; Free, James; Cooper, Ken; Jones, Zachary
2015-01-01
To advance Additive Manufacturing (AM) technologies for production of rocket propulsion components the NASA Glenn Research Center (GRC) is applying state of the art characterization techniques to interrogate microstructure and mechanical properties of AM materials and components at various steps in their processing. The materials being investigated for upper stage rocket engines include titanium, copper, and nickel alloys. Additive manufacturing processes include laser powder bed, electron beam powder bed, and electron beam wire fed processes. Various post build thermal treatments, including Hot Isostatic Pressure (HIP), have been studied to understand their influence on microstructure, mechanical properties, and build density. Micro-computed tomography, electron microscopy, and mechanical testing in relevant temperature environments has been performed to develop relationships between build quality, microstructure, and mechanical performance at temperature. A summary of GRCs Additive Manufacturing roles and experimental findings will be presented.
| 303-384-7527 Noah joined NREL in 2017 after having worked as a consulting building energy analyst. His to smooth the integration of building energy modeling into the building design process. Noah applies a variety of analytical techniques to solve problems associated with building performance as they
DOE Office of Scientific and Technical Information (OSTI.GOV)
This report presents the results from several demonstrations of a new method for sealing building envelope air leaks using an aerosol sealing process developed by the Western Cooling Efficiency Center at UC Davis. The process involves pressurizing a building while applying an aerosol sealant to the interior. As air escapes through leaks in the building envelope, the aerosol particles are transported to the leaks where they collect and form a seal that blocks the leak. Standard blower door technology is used to facilitate the building pressurization, which allows the installer to track the sealing progress during the installation and automaticallymore » verify the final building tightness. Each aerosol envelope sealing installation was performed after drywall was installed and taped, and the process did not appear to interrupt the construction schedule or interfere with other trades working in the homes. The labor needed to physically seal bulk air leaks in typical construction will not be replaced by this technology. However, this technology is capable of bringing the air leakage of a building that was built with standard construction techniques and HERS-verified sealing down to levels that would meet DOE Zero Energy Ready Homes program requirements. When a developer is striving to meet a tighter envelope leakage specification, this technology could greatly reduce the cost to achieve that goal by providing a simple and relatively low cost method for reducing the air leakage of a building envelope with little to no change in their common building practices.« less
Building Green: The Adoption Process of LEED- and Energy Star-Rated Office Buildings
ERIC Educational Resources Information Center
Malkani, Arvin P.
2012-01-01
There are opportunities for green building technology in office buildings to produce energy savings and cost efficiencies that can produce a positive economic and environmental impact. In order for these opportunities to be realized, however, decision makers must appreciate the value of green building technology. The objective of this research is…
Research Progress of Building Materials Used in Construction Land
NASA Astrophysics Data System (ADS)
Niu, Yan
2018-01-01
Construction land preparation is an important aspect of land remediation project. The research of materials in the process of land improvement is the foundation and the core. Therefore, it is necessary to study the materials that may be involved in the process of building land preparation. In this paper, the research on the construction materials such as recycled concrete, geosynthetics, soil stabilizers, soil improvers, building insulation materials and inorganic fibrous insulation materials, which are commonly used in construction sites, is reviewed and discussed in this paper. Land remediation project involved in the construction of land materials to provide reference.
NASA Astrophysics Data System (ADS)
Martyniv, Oleksandra; Kinasz, Roman
2017-10-01
This material covers the row of basic factors that influence on architectonically-spatial solution formation of building of Higher educational establishments (hereinafter universities). For this purpose, the systematization process of factors that influence on the university architecture was conducted and presented. The conclusion of this article was the proposed concept of considering universities as a hierarchical system, elements of which act as factors of influence, which in the process of alternating influence lead to the main goal, namely the formation of a new university building.
PROCESS WATER BUILDING, TRA605. SECTIONS B, C AND D SHOW ...
PROCESS WATER BUILDING, TRA-605. SECTIONS B, C AND D SHOW RELATIONSHIP BETWEEN FLASH EVAPORATORS (ABOVE) AND SEAL AND SUMP TANKS (BELOW). BASEMENT FLOOR IS BELOW GRADE; FIRST FLOOR, ABOVE GRADE. SHIELDING TOLERANCES. BLAW-KNOX 3150-5-7, 8/1950. INL INDEX NO. 531-605-00-098-100012, REV. 2. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Numerical simulation of residual stress in laser based additive manufacturing process
NASA Astrophysics Data System (ADS)
Kalyan Panda, Bibhu; Sahoo, Seshadev
2018-03-01
Minimizing the residual stress build-up in metal-based additive manufacturing plays a pivotal role in selecting a particular material and technique for making an industrial part. In beam-based additive manufacturing, although a great deal of effort has been made to minimize the residual stresses, it is still elusive how to do so by simply optimizing the processing parameters, such as beam size, beam power, and scan speed. Amid different types of additive manufacturing processes, Direct Metal Laser Sintering (DMLS) process uses a high-power laser to melt and sinter layers of metal powder. The rapid solidification and heat transfer on powder bed endows a high cooling rate which leads to the build-up of residual stresses, that will affect the mechanical properties of the build parts. In the present work, the authors develop a numerical thermo-mechanical model for the measurement of residual stress in the AlSi10Mg build samples by using finite element method. Transient temperature distribution in the powder bed was assessed using the coupled thermal to structural model. Subsequently, the residual stresses were estimated with varying laser power. From the simulation result, it found that the melt pool dimensions increase with increasing the laser power and the magnitude of residual stresses in the built part increases.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2015-07-01
Air sealing of building enclosures is a difficult and time-consuming process. Current methods in new construction require laborers to physically locate small and sometimes large holes in multiple assemblies and then manually seal each of them. The innovation demonstrated under this research study was the automated air sealing and compartmentalization of buildings through the use of an aerosolized sealant, developed by the Western Cooling Efficiency Center at University of California Davis.CARB sought to demonstrate this new technology application in a multifamily building in Queens, NY. The effectiveness of the sealing process was evaluated by three methods: air leakage testing ofmore » overall apartment before and after sealing, point-source testing of individual leaks, and pressure measurements in the walls of the target apartment during sealing. Aerosolized sealing was successful by several measures in this study. Many individual leaks that are labor-intensive to address separately were well sealed by the aerosol particles. In addition, many diffuse leaks that are difficult to identify and treat were also sealed. The aerosol-based sealing process resulted in an average reduction of 71% in air leakage across three apartments and an average apartment airtightness of 0.08 CFM50/SF of enclosure area.« less
Naidu, Venkata Ramana; Deshpande, Rucha S; Syed, Moinuddin R; Wakte, Pravin S
2018-07-01
A direct imaging system (Eyecon TM ) was used as a Process Analytical Technology (PAT) tool to monitor fluid bed coating process. Eyecon TM generated real-time onscreen images, particle size and shape information of two identically manufactured laboratory-scale batches. Eyecon TM has accuracy of measuring the particle size increase of ±1 μm on particles in the size range of 50-3000 μm. Eyecon TM captured data every 2 s during the entire process. The moving average of D90 particle size values recorded by Eyecon TM were calculated for every 30 min to calculate the radial coating thickness of coated particles. After the completion of coating process, the radial coating thickness was found to be 11.3 and 9.11 μm, with a standard deviation of ±0.68 and 1.8 μm for Batch 1 and Batch 2, respectively. The coating thickness was also correlated with percent weight build-up by gel permeation chromatography (GPC) and dissolution. GPC indicated weight build-up of 10.6% and 9.27% for Batch 1 and Batch 2, respectively. In conclusion, weight build-up of 10% can also be correlated with 10 ± 2 μm increase in the coating thickness of pellets, indicating the potential applicability of real-time imaging as an endpoint determination tool for fluid bed coating process.
NaturAnalogs for the Unsaturated Zone
DOE Office of Scientific and Technical Information (OSTI.GOV)
A. Simmons; A. Unger; M. Murrell
2000-03-08
The purpose of this Analysis/Model Report (AMR) is to document natural and anthropogenic (human-induced) analog sites and processes that are applicable to flow and transport processes expected to occur at the potential Yucca Mountain repository in order to build increased confidence in modeling processes of Unsaturated Zone (UZ) flow and transport. This AMR was prepared in accordance with ''AMR Development Plan for U0135, Natural Analogs for the UZ'' (CRWMS 1999a). Knowledge from analog sites and processes is used as corroborating information to test and build confidence in flow and transport models of Yucca Mountain, Nevada. This AMR supports the Unsaturatedmore » Zone (UZ) Flow and Transport Process Model Report (PMR) and the Yucca Mountain Site Description. The objectives of this AMR are to test and build confidence in the representation of UZ processes in numerical models utilized in the UZ Flow and Transport Model. This is accomplished by: (1) applying data from Boxy Canyon, Idaho in simulations of UZ flow using the same methodologies incorporated in the Yucca Mountain UZ Flow and Transport Model to assess the fracture-matrix interaction conceptual model; (2) Providing a preliminary basis for analysis of radionuclide transport at Pena Blanca, Mexico as an analog of radionuclide transport at Yucca Mountain; and (3) Synthesizing existing information from natural analog studies to provide corroborating evidence for representation of ambient and thermally coupled UZ flow and transport processes in the UZ Model.« less
Creating "communicative spaces": a case of NGO community organizing for HIV/AIDS prevention.
de Souza, Rebecca
2009-12-01
This study uses the case study method to investigate the processes used by a local nongovernmental organization called the Society for People's Action for Development to organize sex workers in the slums of Bangalore, India, for HIV/AIDS prevention. The nongovernmental organization-facilitated HIV/AIDS program is based on the new paradigm of community organizing that encourages community participation and capacity building. Grounded in the culture-centered approach, this study documents the processes used to organize the women, while highlighting the role of communication in these processes. The study identifies 4 primary processes used to mobilize the community, namely collectivization, community awareness and sensitization, capacity building, and providing legal education and support. Each of these processes highlights the importance of attending to the economic, social, and political realities that shape the health of women. The common thread linking these processes together is the notion of "voice." More specifically, each process serves as a catalyst to produce discursive practices that enable women to provide support to each other, increase awareness in the community about the problems that they face, build self-reliance through financial skills training and communication training, and defend their legal rights. In addition, the study suggests that the primary role of nongovernmental organizations should be the creation of "communicative spaces," which are discursive and material spaces within marginalized communities and mainstream society where cultural participants can identify problems (oftentimes beyond the realm of health), manage solutions to those problems, and advocate for health and social change.
NASA Astrophysics Data System (ADS)
Li, Shuang; Yu, Xiaohui; Zhang, Yanjuan; Zhai, Changhai
2018-01-01
Casualty prediction in a building during earthquakes benefits to implement the economic loss estimation in the performance-based earthquake engineering methodology. Although after-earthquake observations reveal that the evacuation has effects on the quantity of occupant casualties during earthquakes, few current studies consider occupant movements in the building in casualty prediction procedures. To bridge this knowledge gap, a numerical simulation method using refined cellular automata model is presented, which can describe various occupant dynamic behaviors and building dimensions. The simulation on the occupant evacuation is verified by a recorded evacuation process from a school classroom in real-life 2013 Ya'an earthquake in China. The occupant casualties in the building under earthquakes are evaluated by coupling the building collapse process simulation by finite element method, the occupant evacuation simulation, and the casualty occurrence criteria with time and space synchronization. A case study of casualty prediction in a building during an earthquake is provided to demonstrate the effect of occupant movements on casualty prediction.
Community-based research in action: tales from the Ktunaxa community learning centres project.
Stacy, Elizabeth; Wisener, Katherine; Liman, Yolanda; Beznosova, Olga; Lauscher, Helen Novak; Ho, Kendall; Jarvis-Selinger, Sandra
2014-01-01
Rural communities, particularly Aboriginal communities, often have limited access to health information, a situation that can have significant negative consequences. To address the lack of culturally and geographically relevant health information, a community-university partnership was formed to develop, implement, and evaluate Aboriginal Community Learning Centres (CLCs). The objective of this paper is to evaluate the community-based research process used in the development of the CLCs. It focuses on the process of building relationships among partners and the CLC's value and sustainability. Semistructured interviews were conducted with key stakeholders, including principal investigators, community research leads, and supervisors. The interview transcripts were analyzed using an open-coding process to identify themes. Key challenges included enacting shared project governance, negotiating different working styles, and hiring practices based on commitment to project objectives rather than skill set. Technological access provided by the CLCs increased capacity for learning and collective community initiatives, as well as building community leads' skills, knowledge, and self-efficacy. An important lesson was to meet all partners "where they are" in building trusting relationships and adapting research methods to fit the project's context and strengths. Successful results were dependent upon persistence and patience in working through differences, and breaking the project into achievable goals, which collectively contributed to trust and capacity building. The process of building these partnerships resulted in increased capacity of communities to facilitate learning and change initiatives, and the capacity of the university to engage in successful research partnerships with Aboriginal communities in the future.
Code of Federal Regulations, 2010 CFR
2010-04-01
... weight is the weight of all pyrotechnic compositions, and explosive materials and fuse only. 2 The..., the distances must be doubled. 3 While consumer fireworks or articles pyrotechnic in a finished state... pyrotechnic are being processed shall meet these requirements. 4 A maximum of 500 pounds of in-process...
Code of Federal Regulations, 2011 CFR
2011-04-01
... weight is the weight of all pyrotechnic compositions, and explosive materials and fuse only. 2 The..., the distances must be doubled. 3 While consumer fireworks or articles pyrotechnic in a finished state... pyrotechnic are being processed shall meet these requirements. 4 A maximum of 500 pounds of in-process...
ERIC Educational Resources Information Center
Karmiloff-Smith, Annette; Thomas, Michael; Annaz, Dagmara; Humphreys, Kate; Ewing, Sandra; Brace, Nicola; Van Duuren, Mike; Pike, Graham; Grice, Sarah; Campbell, Ruth
2004-01-01
Background: Face processing in Williams syndrome (WS) has been a topic of heated debate over the past decade. Initial claims about a normally developing ("intact") face-processing module were challenged by data suggesting that individuals with WS used a different balance of cognitive processes from controls, even when their behavioural scores fell…
NASA Astrophysics Data System (ADS)
Wan, Chang Jin; Zhu, Li Qiang; Zhou, Ju Mei; Shi, Yi; Wan, Qing
2013-10-01
In neuroscience, signal processing, memory and learning function are established in the brain by modifying ionic fluxes in neurons and synapses. Emulation of memory and learning behaviors of biological systems by nanoscale ionic/electronic devices is highly desirable for building neuromorphic systems or even artificial neural networks. Here, novel artificial synapses based on junctionless oxide-based protonic/electronic hybrid transistors gated by nanogranular phosphorus-doped SiO2-based proton-conducting films are fabricated on glass substrates by a room-temperature process. Short-term memory (STM) and long-term memory (LTM) are mimicked by tuning the pulse gate voltage amplitude. The LTM process in such an artificial synapse is due to the proton-related interfacial electrochemical reaction. Our results are highly desirable for building future neuromorphic systems or even artificial networks via electronic elements.In neuroscience, signal processing, memory and learning function are established in the brain by modifying ionic fluxes in neurons and synapses. Emulation of memory and learning behaviors of biological systems by nanoscale ionic/electronic devices is highly desirable for building neuromorphic systems or even artificial neural networks. Here, novel artificial synapses based on junctionless oxide-based protonic/electronic hybrid transistors gated by nanogranular phosphorus-doped SiO2-based proton-conducting films are fabricated on glass substrates by a room-temperature process. Short-term memory (STM) and long-term memory (LTM) are mimicked by tuning the pulse gate voltage amplitude. The LTM process in such an artificial synapse is due to the proton-related interfacial electrochemical reaction. Our results are highly desirable for building future neuromorphic systems or even artificial networks via electronic elements. Electronic supplementary information (ESI) available. See DOI: 10.1039/c3nr02987e
Review of retrofit strategies decision system in historic perspective
NASA Astrophysics Data System (ADS)
Bostenaru Dan, M. D.
2004-06-01
Urban development is a process. In structuring and developing its phases different actors are implied, who act under different, sometimes opposite, dynamic conditions and within different reference systems. This paper aims to explore the contribution of participatism to disaster mitigation, when this concerns earthquake impact on urban settlements, through the support provided to multi-criteria decision in matters of retrofit. The research broadness in field of decision making on one side and the lack of a specific model for the retrofit of existing buildings on another side led to an extensive review of the state of the art in related models to address the issue. Core idea in the selection of existing models has been the preoccupation for collaborative issues, in other words, the consideration for the different actors implied in the planning process. The historic perspective on participative planning models is made from the view of two generations of citizen implication. The first approaches focus on the participation of the building owner/inhabitant in the planning process of building construction. As current strategies building rehabilitation and selection from alternative retrofit strategies are presented. New developments include innovative models using the internet or spatial databases. The investigated participation approaches show, that participation and communication as a more comprehensive term are an old topic in the field politics-democratisation-urbanism. In all cases it can be talked of "successful learning processes", of the improvement of the level of the professional debate. More than 30 years history of participation marked a transition in understanding the concept: from participation, based on a central decision process leading to a solution controlled and steered by the political-administrative system, to communication, characterised by simultaneous decision processes taking place outside politics and administration in co-operative procedures.
NASA Astrophysics Data System (ADS)
Hodgkins, Alex Liam; Diez, Victor; Hegner, Benedikt
2012-12-01
The Software Process & Infrastructure (SPI) project provides a build infrastructure for regular integration testing and release of the LCG Applications Area software stack. In the past, regular builds have been provided using a system which has been constantly growing to include more features like server-client communication, long-term build history and a summary web interface using present-day web technologies. However, the ad-hoc style of software development resulted in a setup that is hard to monitor, inflexible and difficult to expand. The new version of the infrastructure is based on the Django Python framework, which allows for a structured and modular design, facilitating later additions. Transparency in the workflows and ease of monitoring has been one of the priorities in the design. Formerly missing functionality like on-demand builds or release triggering will support the transition to a more agile development process.
Building configuration and seismic design: The architecture of earthquake resistance
NASA Astrophysics Data System (ADS)
Arnold, C.; Reitherman, R.; Whitaker, D.
1981-05-01
The architecture of a building in relation to its ability to withstand earthquakes was determined. Aspects of round motion which are significant to building behavior are discussed. Results of a survey of configuration decisions that affect the performance of buildings with a focus on the architectural aspects of configuration design are provided. Configuration derivation, building type as it relates to seismic design, and seismic design, and seismic issues in the design process are examined. Case studies of the Veterans' Administration Hospital in Loma Linda, California, and the Imperial Hotel in Tokyo, Japan, are presented. The seismic design process is described paying special attention to the configuration issues. The need is stressed for guidelines, codes, and regulations to ensure design solutions that respect and balance the full range of architectural, engineering, and material influences on seismic hazards.
10. Photograph of a line drawing. 'PROCESS FLOW SCHEMATIC, GAS ...
10. Photograph of a line drawing. 'PROCESS FLOW SCHEMATIC, GAS PRODUCER PROCESS, BUILDING 10A.' Holston Army Ammunition Plant, Holston Defense Corporation. August 29, 1974. Delineator: G. A. Horne. Drawing # SK-1942. - Holston Army Ammunition Plant, Producer Gas Plant, Kingsport, Sullivan County, TN
Cognitive and artificial representations in handwriting recognition
NASA Astrophysics Data System (ADS)
Lenaghan, Andrew P.; Malyan, Ron
1996-03-01
Both cognitive processes and artificial recognition systems may be characterized by the forms of representation they build and manipulate. This paper looks at how handwriting is represented in current recognition systems and the psychological evidence for its representation in the cognitive processes responsible for reading. Empirical psychological work on feature extraction in early visual processing is surveyed to show that a sound psychological basis for feature extraction exists and to describe the features this approach leads to. The first stage of the development of an architecture for a handwriting recognition system which has been strongly influenced by the psychological evidence for the cognitive processes and representations used in early visual processing, is reported. This architecture builds a number of parallel low level feature maps from raw data. These feature maps are thresholded and a region labeling algorithm is used to generate sets of features. Fuzzy logic is used to quantify the uncertainty in the presence of individual features.
Using music to study the evolution of cognitive mechanisms relevant to language.
Patel, Aniruddh D
2017-02-01
This article argues that music can be used in cross-species research to study the evolution of cognitive mechanisms relevant to spoken language. This is because music and language share certain cognitive processing mechanisms and because music offers specific advantages for cross-species research. Music has relatively simple building blocks (tones without semantic properties), yet these building blocks are combined into rich hierarchical structures that engage complex cognitive processing. I illustrate this point with regard to the processing of musical harmonic structure. Because the processing of musical harmonic structure has been shown to interact with linguistic syntactic processing in humans, it is of interest to know if other species can acquire implicit knowledge of harmonic structure through extended exposure to music during development (vs. through explicit training). I suggest that domestic dogs would be a good species to study in addressing this question.
Woods, J
2001-01-01
The third generation cardiac institute will build on the successes of the past in structuring the service line, re-organizing to assimilate specialist interests, and re-positioning to expand cardiac services into cardiovascular services. To meet the challenges of an increasingly competitive marketplace and complex delivery system, the focus for this new model will shift away from improved structures, and toward improved processes. This shift will require a sound methodology for statistically measuring and sustaining process changes related to the optimization of cardiovascular care. In recent years, GE Medical Systems has successfully applied Six Sigma methodologies to enable cardiac centers to control key clinical and market development processes through its DMADV, DMAIC and Change Acceleration processes. Data indicates Six Sigma is having a positive impact within organizations across the United States, and when appropriately implemented, this approach can serve as a solid foundation for building the next generation cardiac institute.
Statistical analysis of porosity of 17-4PH alloy processed by selective laser melting
NASA Astrophysics Data System (ADS)
Ponnusamy, P.; Masood, S. H.; Ruan, D.; Palanisamy, S.; Mohamed, O. A.
2017-07-01
Selective Laser Melting (SLM) is a powder-bed type Additive Manufacturing (AM) process, where parts are built layer-by-layer by laser melting of powder layers of metal. There are several SLM process parameters that affect the accuracy and quality of the metal parts produced by SLM. Therefore, it is essential to understand the effect of these parameters on the quality and properties of the parts built by this process. In this paper, using Taguchi design of experiments, the effect of four SLM process parameters namely laser power, defocus distance, layer thickness and build orientation are considered on the porosity of 17-4PH stainless steel parts built on ProX200 SLM direct metal printer. The porositywas found to be optimum at a defocus distance of -4mm and a laser power of 240 W with a layer thickness of 30 μm and using vertical build orientation.
Artificial intelligence support for scientific model-building
NASA Technical Reports Server (NTRS)
Keller, Richard M.
1992-01-01
Scientific model-building can be a time-intensive and painstaking process, often involving the development of large and complex computer programs. Despite the effort involved, scientific models cannot easily be distributed and shared with other scientists. In general, implemented scientific models are complex, idiosyncratic, and difficult for anyone but the original scientific development team to understand. We believe that artificial intelligence techniques can facilitate both the model-building and model-sharing process. In this paper, we overview our effort to build a scientific modeling software tool that aids the scientist in developing and using models. This tool includes an interactive intelligent graphical interface, a high-level domain specific modeling language, a library of physics equations and experimental datasets, and a suite of data display facilities.
Social network supported process recommender system.
Ye, Yanming; Yin, Jianwei; Xu, Yueshen
2014-01-01
Process recommendation technologies have gained more and more attention in the field of intelligent business process modeling to assist the process modeling. However, most of the existing technologies only use the process structure analysis and do not take the social features of processes into account, while the process modeling is complex and comprehensive in most situations. This paper studies the feasibility of social network research technologies on process recommendation and builds a social network system of processes based on the features similarities. Then, three process matching degree measurements are presented and the system implementation is discussed subsequently. Finally, experimental evaluations and future works are introduced.
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. King
2011-06-27
Building K-33 was constructed in 1954 as the final section of the five-stage uranium enrichment cascade at the Oak Ridge Gaseous Diffusion Plant (ORGDP). The two original building (K-25 and K-27) were used to produce weapons grade highly enriched uranium (HEU). Building K-29, K-31, and K-33 were added to produce low enriched uranium (LEU) for nuclear power plant fuel. During ORGDP operations K-33 produced a peak enrichment of 2.5%. Thousands of tons of reactor tails fed into gaseous diffusion plants in the 1950s and early 1960s introducing some fission products and transuranics. Building K-33 was a two-story, 25-meters (82-feet) tallmore » structure with approximately 30 hectare (64 acres) of floor space. The Operations (first) Floor contained offices, change houses, feed vaporization rooms, and auxiliary equipment to support enrichment operations. The Cell (second) Floor contained the enrichment process equipment and was divided into eight process units (designated K-902-1 through K-902-8). Each unit contained ten cells, and each cell contained eight process stages (diffusers) for a total of 640 enrichment stages. 1985: LEU buildings were taken off-line after the anticipated demand for uranium enrichment failed to materialize. 1987: LEU buildings were placed in permanent shutdown. Process equipment were maintained in a shutdown state. 1997: DOE signed an Action Memorandum for equipment removal and decontamination of Buildings K-29, K-31, K-33; BNFL awarded contract to reindustrialize the buildings under the Three Buildings D&D and Recycle Project. 2002: Equipment removal complete and effort shifts to vacuuming, chemical cleaning, scabbling, etc. 2005: Decontamination efforts in K-33 cease. Building left with significant {sup 99}Tc contamination on metal structures and PCB contamination in concrete. Uranium, transuranics, and fission products also present on building shell. 2009: DOE targets Building K-33 for demolition. 2010: ORAU contracted to characterize Building K-33 for final disposition at the Environmental Management Waste Management Facility (EMWMF) in Oak Ridge. ORAU collected 439 samples from May and June. LATA Sharp started removing transite panels in September. 2011: LATA Sharp began demolition in January and expects the last waste shipment to EMWMF in September. Approximately 237,000 m{sup 3} (310,000 yd{sup 3}, bulked) of waste taken to EMWMF in 23,000 truckloads expected by project completion.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Benson, R.L.; Brown, S.S.D.; Ferguson, S.P.
1995-12-31
The objectives of this program are to (a) develop a process for converting natural gas to methyl chloride via an oxyhydrochlorination route using highly selective, stable catalysts in a fixed-bed, (b) design a reactor capable of removing the large amount of heat generated in the process so as to control the reaction, (c) develop a recovery system capable of removing the methyl chloride from the product stream and (d) determine the economics and commercial viability of the process. The general approach has been as follows: (a) design and build a laboratory scale reactor, (b) define and synthesize suitable OHC catalystsmore » for evaluation, (c) select first generation OHC catalyst for Process Development Unit (PDU) trials, (d) design, construct and startup PDU, (e) evaluate packed bed reactor design, (f) optimize process, in particular, product recovery operations, (g) determine economics of process, (h) complete preliminary engineering design for Phase II and (i) make scale-up decision and formulate business plan for Phase II. Conclusions regarding process development and catalyst development are presented.« less
NASA Astrophysics Data System (ADS)
van Veenstra, Anne Fleur; Janssen, Marijn
One of the main challenges for e-government is to create coherent services for citizens and businesses. Realizing Integrated Service Delivery (ISD) requires government agencies to collaborate across their organizational boundaries. The coordination of processes across multiple organizations to realize ISD is called orchestration. One way of achieving orchestration is to formalize processes using architecture. In this chapter we identify architectural principles for orchestration by looking at three case studies of cross-organizational service delivery chain formation in the Netherlands. In total, six generic principles were formulated and subsequently validated in two workshops with experts. These principles are: (i) build an intelligent front office, (ii) give processes a clear starting point and end, (iii) build a central workflow application keeping track of the process, (iv) differentiate between simple and complex processes, (v) ensure that the decision-making responsibility and the overview of the process are not performed by the same process role, and (vi) create a central point where risk profiles are maintained. Further research should focus on how organizations can adapt these principles to their own situation.
Powder Bed Layer Characteristics: The Overseen First-Order Process Input
NASA Astrophysics Data System (ADS)
Mindt, H. W.; Megahed, M.; Lavery, N. P.; Holmes, M. A.; Brown, S. G. R.
2016-08-01
Powder Bed Additive Manufacturing offers unique advantages in terms of manufacturing cost, lot size, and product complexity compared to traditional processes such as casting, where a minimum lot size is mandatory to achieve economic competitiveness. Many studies—both experimental and numerical—are dedicated to the analysis of how process parameters such as heat source power, scan speed, and scan strategy affect the final material properties. Apart from the general urge to increase the build rate using thicker powder layers, the coating process and how the powder is distributed on the processing table has received very little attention to date. This paper focuses on the first step of every powder bed build process: Coating the process table. A numerical study is performed to investigate how powder is transferred from the source to the processing table. A solid coating blade is modeled to spread commercial Ti-6Al-4V powder. The resulting powder layer is analyzed statistically to determine the packing density and its variation across the processing table. The results are compared with literature reports using the so-called "rain" models. A parameter study is performed to identify the influence of process table displacement and wiper velocity on the powder distribution. The achieved packing density and how that affects subsequent heat source interaction with the powder bed is also investigated numerically.
NASA Astrophysics Data System (ADS)
McDaniels, T.; Steyn, D. G.; Johnson, M. S.; Small, M.; Leclerc, G.; Vignola, R.; Chan, K.; Grossmann, I.; Wong-Parodi, G.
2014-12-01
Improving resilience to drought in complex social-environmental systems (SES) is extraordinarily important, particularly for rural tropical locations where small changes in climate regimes can have dramatic SES impacts. Efforts to build drought resilience must necessarily be planned and implemented within SES governance systems that involve linkages in water and land use administration from local to national levels. These efforts require knowledge and understanding that links climate and weather forecasts to regional and local hydrology, to social-economic and environmental systems, and to governance processes. In order to provide structure for such complex choices and investments, we argue that a focus on structured decision processes that involve linkages among science, technological perspectives, and public values conducted with agencies and stakeholders will provide a crucial framework for comparing and building insight for pursuing alternative courses of action to build drought resilience. This paper focuses on a regional case study in the seasonally-dry northwest region of Costa Rica, in watersheds rated as most threatened in the country in terms of drought. We present the overall framework guiding the transdisciplinary efforts to link scientific and technical understanding to public values, in order to foster civil society actions that lead to improved drought resilience. Initial efforts to characterize hydrological and climate regimes will be reported along with our approach to linking natural science findings, social inventories in terms of perspectives on SES, and the psychology and patterns of reliance on forecast information that provide the basis for characterizing public understanding. The overall linkage of technical and value information is focused on creating and comparing alternative actions that can potentially build resilience in short and long time frames by building decision making processes involving stakeholders, agencies and interested parties.
Processing equipment for grinding of building powders
NASA Astrophysics Data System (ADS)
Fediuk, R. S.; Ibragimov, R. A.; Lesovik, V. S.; Pak, A. A.; Krylov, V. V.; Poleschuk, M. M.; Stoyushko, N. Y.; Gladkova, N. A.
2018-03-01
In the article questions of mechanical grinding up to nanosize of building powder materials are considered. In the process of mechanoactivation of the composite binder, active molecules of cement minerals arise when molecular packets are destroyed in the areas of defects and loosening of the metastable phase during decompensation of intermolecular forces. The process is accompanied by a change in the kinetics of hardening Portland cement. Mechanical processes in the grinding of mineral materials cause, together with an increase in their surface energy, the growth of the isobaric potential of the powders and, accordingly, their chemical activity, which also contributes to high adhesion strength when they come into contact with binders. Thus, a set of measures for mechanical activation allows more fully use the mass of components of the filled cement systems and regulate their properties. At relatively low costs, it is possible to provide an impressive and, importantly, easily repeatable in production conditions result. It is revealed that the use of a vario-planetary mill allows to achieve the best results on grinding the powder building materials.
Residual stress evaluation of components produced via direct metal laser sintering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kemerling, Brandon; Lippold, John C.; Fancher, Christopher M.
Direct metal laser sintering is an additive manufacturing process which is capable of fabricating three-dimensional components using a laser energy source and metal powder particles. Despite the numerous benefits offered by this technology, the process maturity is low with respect to traditional subtractive manufacturing methods. Relationships between key processing parameters and final part properties are generally lacking and require further development. In this study, residual stresses were evaluated as a function of key process variables. The variables evaluated included laser scan strategy and build plate preheat temperature. Residual stresses were measured experimentally via neutron diffraction and computationally via finite elementmore » analysis. Good agreement was shown between the experimental and computational results. Results showed variations in the residual stress profile as a function of laser scan strategy. Compressive stresses were dominant along the build height (z) direction, and tensile stresses were dominant in the x and y directions. Build plate preheating was shown to be an effective method for alleviating residual stress due to the reduction in thermal gradient.« less
Residual stress evaluation of components produced via direct metal laser sintering
Kemerling, Brandon; Lippold, John C.; Fancher, Christopher M.; ...
2018-03-22
Direct metal laser sintering is an additive manufacturing process which is capable of fabricating three-dimensional components using a laser energy source and metal powder particles. Despite the numerous benefits offered by this technology, the process maturity is low with respect to traditional subtractive manufacturing methods. Relationships between key processing parameters and final part properties are generally lacking and require further development. In this study, residual stresses were evaluated as a function of key process variables. The variables evaluated included laser scan strategy and build plate preheat temperature. Residual stresses were measured experimentally via neutron diffraction and computationally via finite elementmore » analysis. Good agreement was shown between the experimental and computational results. Results showed variations in the residual stress profile as a function of laser scan strategy. Compressive stresses were dominant along the build height (z) direction, and tensile stresses were dominant in the x and y directions. Build plate preheating was shown to be an effective method for alleviating residual stress due to the reduction in thermal gradient.« less
NASA Astrophysics Data System (ADS)
Siame, Lionel L.; Lee, Jian-Cheng
2016-12-01
In Taiwan, tectonic and climatic processes are exacerbated, involving deformation and erosion rates that are among the highest ones in the world. The combination of these internal and external forcing factors results in frequent and severe natural hazards in many aspects, including earthquake, landslide, mud/debris flows, floods, tsunamis, etc., which became a real concern not only for in the Taiwanese society but also applying for many countries or areas in the world. Within this general context, Taiwan orogen is thus a quite exceptional natural laboratory to study the coupling relationships between internal and external processes, and thus better cope with implications on society and economics. From a fundamental science point of view, Taiwan orogen has long been recognized as one of the best places in the world to study mountain building processes including lithosphere and crustal deformation, mechanisms of mountain building, seismic cycle and seismic behaviour of active faults. In fact, Taiwan orogen is probably one of the rare mountain belts where processes of mountain building can be apprehended from oceanic to continental subduction and post-orogenic extension.
Bin recycling strategy for improving the histogram precision on GPU
NASA Astrophysics Data System (ADS)
Cárdenas-Montes, Miguel; Rodríguez-Vázquez, Juan José; Vega-Rodríguez, Miguel A.
2016-07-01
Histogram is an easily comprehensible way to present data and analyses. In the current scientific context with access to large volumes of data, the processing time for building histogram has dramatically increased. For this reason, parallel construction is necessary to alleviate the impact of the processing time in the analysis activities. In this scenario, GPU computing is becoming widely used for reducing until affordable levels the processing time of histogram construction. Associated to the increment of the processing time, the implementations are stressed on the bin-count accuracy. Accuracy aspects due to the particularities of the implementations are not usually taken into consideration when building histogram with very large data sets. In this work, a bin recycling strategy to create an accuracy-aware implementation for building histogram on GPU is presented. In order to evaluate the approach, this strategy was applied to the computation of the three-point angular correlation function, which is a relevant function in Cosmology for the study of the Large Scale Structure of Universe. As a consequence of the study a high-accuracy implementation for histogram construction on GPU is proposed.
Review of the Application of Green Building and Energy Saving Technology
NASA Astrophysics Data System (ADS)
Tong, Zhineng
2017-12-01
The use of energy-saving technologies in green buildings should run through the entire process of building design, construction and use, enabling green energy-saving technologies to maximize their effectiveness in construction. Realize the sustainable development of green building, reduce energy consumption, reduce people’s interference with the natural environment, suitable for people living in “green” building.
Bore pile foundation tall buildings closed in the heritage building
NASA Astrophysics Data System (ADS)
Triastuti, Nusa Setiani
2017-11-01
Bore pile foundation for high building surroundings heritage building should be not damage. Construction proses must good, no necking, no mixed deep water, no sliding soil, nonporous concrete. Objective the execution of bore pile so that heritage buildings and neighboring buildings that are old do not experience cracks, damage and tilting. The survey methodology was observe the process of the implementation of the dominant silt, clay soil, in addition a limited space and to analyze the results of loading tests, investigations of soil and daily reports. Construction process determines the success of the structure bore pile in high building structure bearing, without damaging a heritage building. Attainment the hard soil depth, density concrete, observable clean reinforcement in the implementation. Monitoring the implementation of, among others, the face of the ground water little reduce in the area and outside the footprint of the building, no impact of vibration drilling equipment, watching the mud content on the water coming out at the time of drilling, concrete volume was monitored each 2 m bore depth of pile, The result researched heritage building was not damage. The test results bore pile axial, lateral analyzed the results have the appropriate force design required.
Building Fossils in the Elementary School and Writing about Them Using Computers.
ERIC Educational Resources Information Center
Schlenker, Richard M.; Yoshida, Sarah
This material describes a fossil-building activity using sea shells, chicken bones, and plaster for grade one through three students. Related process skills, vocabulary, computer principles, time requirements, and materials are listed. Two methods of building the fossils are discussed. After building the fossils, classes may be divided into pairs…
Designing and Securing an Event Processing System for Smart Spaces
ERIC Educational Resources Information Center
Li, Zang
2011-01-01
Smart spaces, or smart environments, represent the next evolutionary development in buildings, banking, homes, hospitals, transportation systems, industries, cities, and government automation. By riding the tide of sensor and event processing technologies, the smart environment captures and processes information about its surroundings as well as…
Building a Foreign Military Sales Construction Delivery Strategy Decision Support System
1991-09-01
DSS, formulates it into a computer model and produces solutions using information and expert heuristics. Using the Expert Systeic Process to Build a DSS...computer model . There are five stages in the development of an expert system. They are: 1) Identify and characterize the important aspects of the problem...and Steven A. Hidreth. U.S. Security Assistance: The Political Process. Massachusetts: Heath and Company, 1985. 19. Guirguis , Amir A., Program
PROCESS WATER BUILDING, TRA605. FLOOR AND ROOF PLANS FOR SECOND ...
PROCESS WATER BUILDING, TRA-605. FLOOR AND ROOF PLANS FOR SECOND FLOOR. DETAILS OF CONCRETE ROOF SLABS. FLASH EVAPORATOR SUPPORTS AND PIPE OPENINGS TO TANKS BELOW. NOTE SPECIFIES THAT EQUIPMENT IS TO BE INSTALLED BEFORE ERECTION OF ROOF AND WALLS. BLAW-KNOX 3150-805-4, 1/1951. INL INDEX NO. 531-0605-62-098-100660, REV. 2. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
PROCESS WATER BUILDING, TRA605. FLOOR PLAN AND SECTION OF FLASH ...
PROCESS WATER BUILDING, TRA-605. FLOOR PLAN AND SECTION OF FLASH EVAPORATOR ROOM SHOWING ITS LOCATION ABOVE THE SEAL AND SUMP TANKS. PIPING TAKES WATER FROM SEAL TANK UPWARD TO FLASH EVAPORATORS AND THEN BACK DOWN TO SUMP TANK. BLAW-KNOX 3150-5-6, 8/1950. INL INDEX NO. 531-605-00-098-100011, REV. 3. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
NASA Astrophysics Data System (ADS)
Beardsley, Sara; Stochetti, Alejandro; Cerone, Marc
2018-03-01
Akhmat Tower is a 435m supertall building designed by Adrian Smith + Gordon Gill Architecture. It is currently under construction in the city of Grozny, in the Chechen Republic, in the North Caucasus region of Russia. The design of the tower was done during a collaborative process by a multi-disciplinary architectural and engineering team, based primarily in the United States and Russia. During this process, the designers considered many factors including, most primarily, the cultural and historical context, the structural requirements given the high seismicity of the region, and the client's programmatic needs. The resulting crystalline-shaped tower is both an aesthetic statement and a performative architectural solution which will be a new landmark for Chechnya. "The Design of Akhmat Tower" describes in detail the design process including structural considerations, exterior wall design, building program, interior design, the tuned mass damper, and the use of building information modeling.
García-Ramírez, Manuel; Paloma, Virginia; Suarez-Balcazar, Yolanda; Balcazar, Fabricio
2009-09-01
Europe is in the process of building a more participative, just, and inclusive European Union. The European Social Fund, which is an initiative developed to actively promote multinational partnerships that address pressing social issues, is a good example of the European transformation. This article describes the steps taken to develop and evaluate the activities of an international network promoting collaborative capacity among regional partners involved in the prevention of labor discrimination toward immigrants in three European countries-Spain, Belgium, and Italy. An international team of community psychologists proposed an empowering approach to assess the collaborative capacity of the network. This approach consisted of three steps: (1) establishing a collaborative relationship among partners, (2) building collaborative capacity, and (3) evaluating the collaborative capacity of the network. We conclude with lessons learned from the process and provide recommendations for addressing the challenges inherent in international collaboration processes.
Appendix to HDC 2118 design criteria 100-X reactor water plant, general description - section II
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1952-03-29
The factors responsible for the advances of 100-X compared with the older areas are: Simplification of the process, such as elimination of separate process water clearwells, by having the filtered water reservoirs perform that function. Combination of separate buildings into one building, such as combining filter pump house and process pump house. Use of electric standby. Use of higher capacity pumps and filter basins, and so fewer number of units. Centralization of control and operation. More compact arrangement of plant components. Use of waste heat for space heating, recovered from reactor effluent, backed up by steam plant.
Towards Methodologies for Building Knowledge-Based Instructional Systems.
ERIC Educational Resources Information Center
Duchastel, Philippe
1992-01-01
Examines the processes involved in building instructional systems that are based on artificial intelligence and hypermedia technologies. Traditional instructional systems design methodology is discussed; design issues including system architecture and learning strategies are addressed; and a new methodology for building knowledge-based…
Drescher, Philipp; Sarhan, Mohamed; Seitz, Hermann
2016-12-01
Selective electron beam melting (SEBM) is a relatively new additive manufacturing technology for metallic materials. Specific to this technology is the sintering of the metal powder prior to the melting process. The sintering process has disadvantages for post-processing. The post-processing of parts produced by SEBM typically involves the removal of semi-sintered powder through the use of a powder blasting system. Furthermore, the sintering of large areas before melting decreases productivity. Current investigations are aimed at improving the sintering process in order to achieve better productivity, geometric accuracy, and resolution. In this study, the focus lies on the modification of the sintering process. In order to investigate and improve the sintering process, highly porous titanium test specimens with various scan speeds were built. The aim of this study was to decrease build time with comparable mechanical properties of the components and to remove the residual powder more easily after a build. By only sintering the area in which the melt pool for the components is created, an average productivity improvement of approx. 20% was achieved. Tensile tests were carried out, and the measured mechanical properties show comparatively or slightly improved values compared with the reference.
Sames, William J.; Unocic, Kinga A.; Helmreich, Grant W.; ...
2016-10-07
A novel technique was developed to control the microstructure evolution in Alloy 718 processed using Electron Beam Melting (EBM). In situ solution treatment and aging of Alloy 718 was performed by heating the top surface of the build after build completion scanning an electron beam to act as a planar heat source during the cool down process. Results demonstrate that the measured hardness (478 ± 7 HV) of the material processed using in situ heat treatment similar to that of peak-aged Inconel 718. Large solidification grains and cracks formed, which are identified as the likely mechanism leading to failure ofmore » tensile tests of the in situ heat treatment material under loading. Despite poor tensile performance, the technique proposed was shown to successively age Alloy 718 (increase precipitate size and hardness) without removing the sample from the process chamber, which can reduce the number of process steps in producing a part. Lastly, tighter controls on processing temperature during layer melting to lower process temperature and selective heating during in situ heat treatment to reduce over-sintering are proposed as methods for improving the process.« less
Mathematical Abstraction: Constructing Concept of Parallel Coordinates
NASA Astrophysics Data System (ADS)
Nurhasanah, F.; Kusumah, Y. S.; Sabandar, J.; Suryadi, D.
2017-09-01
Mathematical abstraction is an important process in teaching and learning mathematics so pre-service mathematics teachers need to understand and experience this process. One of the theoretical-methodological frameworks for studying this process is Abstraction in Context (AiC). Based on this framework, abstraction process comprises of observable epistemic actions, Recognition, Building-With, Construction, and Consolidation called as RBC + C model. This study investigates and analyzes how pre-service mathematics teachers constructed and consolidated concept of Parallel Coordinates in a group discussion. It uses AiC framework for analyzing mathematical abstraction of a group of pre-service teachers consisted of four students in learning Parallel Coordinates concepts. The data were collected through video recording, students’ worksheet, test, and field notes. The result shows that the students’ prior knowledge related to concept of the Cartesian coordinate has significant role in the process of constructing Parallel Coordinates concept as a new knowledge. The consolidation process is influenced by the social interaction between group members. The abstraction process taken place in this group were dominated by empirical abstraction that emphasizes on the aspect of identifying characteristic of manipulated or imagined object during the process of recognizing and building-with.
Alkaline fuel cell with nitride membrane
NASA Astrophysics Data System (ADS)
Sun, Shen-Huei; Pilaski, Moritz; Wartmann, Jens; Letzkus, Florian; Funke, Benedikt; Dura, Georg; Heinzel, Angelika
2017-06-01
The aim of this work is to fabricate patterned nitride membranes with Si-MEMS-technology as a platform to build up new membrane-electrode-assemblies (MEA) for alkaline fuel cell applications. Two 6-inch wafer processes based on chemical vapor deposition (CVD) were developed for the fabrication of separated nitride membranes with a nitride thickness up to 1 μm. The mechanical stability of the perforated nitride membrane has been adjusted in both processes either by embedding of subsequent ion implantation step or by optimizing the deposition process parameters. A nearly 100% yield of separated membranes of each deposition process was achieved with layer thickness from 150 nm to 1 μm and micro-channel pattern width of 1μm at a pitch of 3 μm. The process for membrane coating with electrolyte materials could be verified to build up MEA. Uniform membrane coating with channel filling was achieved after the optimization of speed controlled dip-coating method and the selection of dimethylsulfoxide (DMSO) as electrolyte solvent. Finally, silver as conductive material was defined for printing a conductive layer onto the MEA by Ink-Technology. With the established IR-thermography setup, characterizations of MEAs in terms of catalytic conversion were performed successfully. The results of this work show promise for build up a platform on wafer-level for high throughput experiments.
Rankings in Institutional Strategies and Processes: Impact or Illusion?
ERIC Educational Resources Information Center
Hazelkorn, Ellen; Loukkola, Tia; Zhang, Thérèse
2014-01-01
The "Rankings in Institutional Strategies and Processes" (RISP) project is the first pan-European study of the impact and influence of rankings on European higher education institutions. The project has sought to build understanding of how rankings impact and influence the development of institutional strategies and processes and its…
School Success as a Process of Structuration
ERIC Educational Resources Information Center
Tubin, Dorit
2015-01-01
Purpose: The purpose of the present study is to explore the process, routines, and structuration at successful schools leading their students to high achievements. Method: The approach of building a theory from case study research together with process perspective and an organizational routines model were applied to analyzing seven successful…
3. VIEW OF THE PROCESSING PLANT TO THE WEST. THE ...
3. VIEW OF THE PROCESSING PLANT TO THE WEST. THE PROCESSING PLANT IS LEFT CENTER. THE BLACKSMITH/MINE CAR REPAIR SHOP AND PARTS/SUPPLIES BUILDINGS ARE RIGHT CENTER. - Smith Mine, Bear Creek 1.5 miles West of Town of Bear Creek, Red Lodge, Carbon County, MT
Philosophic Processes and the Study of Human Moving.
ERIC Educational Resources Information Center
Bressan, Elizabeth S.; Pieter, Willy
1985-01-01
A theoretical framework describing second-order philosophical processes that can be productive for human movement studies is presented. The processes of edification and theory building can clarify issues, expand viewpoints, and establish systematic ways of dealing with a phenomenon, leading to the more mature forms of dialogues and theories. (MT)
76 FR 41297 - Grant Program To Build Tribal Energy Development Capacity
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-13
... develop energy resources on Indian land and properly accounting for resulting energy resource production and revenues. We will use a competitive evaluation process based on criteria stated in the.... Determine what process(es) and/or procedure(s) may be used to eliminate capacity gaps or sustain the...
Appreciative Inquiry as an Organizational Development Tool.
ERIC Educational Resources Information Center
Martinetz, Charles F.
2002-01-01
Defines appreciative inquiry as a change model that uses traditional organizational development processes (team building, strategic planning, business process redesign, management audits) in a new way, both as a philosophy and as a process. Emphasizes collaboration, participation of all voices, and changing the organization rather than the people.…
Integrated Survey Procedures for the Virtual Reading and Fruition of Historical Buildings
NASA Astrophysics Data System (ADS)
Scandurra, S.; Pulcrano, M.; Cirillo, V.; Campi, M.; di Luggo, A.; Zerlenga, O.
2018-05-01
This paper presents the developments of research related to the integration of digital survey methodologies with reference to image-based and range-based technologies. Starting from the processing of point clouds, the data were processed for both the geometric interpretation of the space as well as production of three-dimensional models that describe the constitutive and morphological relationships. The subject of the study was the church of San Carlo all'Arena in Naples (Italy), with a HBIM model being produced that is semantically consistent with the real building. Starting from the data acquired, a visualization system was created for the virtual exploration of the building.
SAGA: A project to automate the management of software production systems
NASA Technical Reports Server (NTRS)
Campbell, Roy H.; Beckman-Davies, C. S.; Benzinger, L.; Beshers, G.; Laliberte, D.; Render, H.; Sum, R.; Smith, W.; Terwilliger, R.
1986-01-01
Research into software development is required to reduce its production cost and to improve its quality. Modern software systems, such as the embedded software required for NASA's space station initiative, stretch current software engineering techniques. The requirements to build large, reliable, and maintainable software systems increases with time. Much theoretical and practical research is in progress to improve software engineering techniques. One such technique is to build a software system or environment which directly supports the software engineering process, i.e., the SAGA project, comprising the research necessary to design and build a software development which automates the software engineering process. Progress under SAGA is described.
United Space Alliance LLC Parachute Refurbishment Facility Model
NASA Technical Reports Server (NTRS)
Esser, Valerie; Pessaro, Martha; Young, Angela
2007-01-01
The Parachute Refurbishment Facility Model was created to reflect the flow of hardware through the facility using anticipated start and delivery times from a project level IV schedule. Distributions for task times were built using historical build data for SFOC work and new data generated for CLV/ARES task times. The model currently processes 633 line items from 14 SFOC builds for flight readiness, 16 SFOC builds returning from flight for defoul, wash, and dry operations, 12 builds for CLV manufacturing operations, and 1 ARES 1X build. Modeling the planned workflow through the PRF is providing a reliable way to predict the capability of the facility as well as the manpower resource need. Creating a real world process allows for real world problems to be identified and potential workarounds to be implemented in a safe, simulated world before taking it to the next step, implementation in the real world.
Semantic Service Design for Collaborative Business Processes in Internetworked Enterprises
NASA Astrophysics Data System (ADS)
Bianchini, Devis; Cappiello, Cinzia; de Antonellis, Valeria; Pernici, Barbara
Modern collaborating enterprises can be seen as borderless organizations whose processes are dynamically transformed and integrated with the ones of their partners (Internetworked Enterprises, IE), thus enabling the design of collaborative business processes. The adoption of Semantic Web and service-oriented technologies for implementing collaboration in such distributed and heterogeneous environments promises significant benefits. IE can model their own processes independently by using the Software as a Service paradigm (SaaS). Each enterprise maintains a catalog of available services and these can be shared across IE and reused to build up complex collaborative processes. Moreover, each enterprise can adopt its own terminology and concepts to describe business processes and component services. This brings requirements to manage semantic heterogeneity in process descriptions which are distributed across different enterprise systems. To enable effective service-based collaboration, IEs have to standardize their process descriptions and model them through component services using the same approach and principles. For enabling collaborative business processes across IE, services should be designed following an homogeneous approach, possibly maintaining a uniform level of granularity. In the paper we propose an ontology-based semantic modeling approach apt to enrich and reconcile semantics of process descriptions to facilitate process knowledge management and to enable semantic service design (by discovery, reuse and integration of process elements/constructs). The approach brings together Semantic Web technologies, techniques in process modeling, ontology building and semantic matching in order to provide a comprehensive semantic modeling framework.
20. VIEW OF WASTE TREATMENT CONTROL ROOM IN BUILDING 374. ...
20. VIEW OF WASTE TREATMENT CONTROL ROOM IN BUILDING 374. THE BUILDING 371/374 COMPLEX WAS DESIGNED TO EMPHASIZE AUTOMATICALLY CONTROLLED, REMOTELY OPERATED PROCESSES. (1/80) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO
ERIC Educational Resources Information Center
JACKSON, R. GRAHAM
CHOICES AND ISSUES IN SELECTING MATERIALS FOR MODERNIZATION OF SCHOOL BUILDINGS ARE DISCUSSED IN THIS REPORT. BACKGROUND INFORMATION IS INTRODUCED IN TERMS OF REASONS FOR ABANDONMENT, THE CAUSES AND EFFECTS OF SCHOOL BUILDING OBSOLESCENCE, AND PROBLEMS IN THE MODERNIZATION PROCESS. INTERIOR PARTITIONS ARE DISCUSSED IN TERMS OF BUILDING MATERIALS,…
Post Occupancy Evaluation of Educational Buildings and Equipment.
ERIC Educational Resources Information Center
Watson, Chris
1997-01-01
Details the post occupancy evaluation (POE) process for public buildings. POEs are used to improve design and optimize educational building and equipment use. The evaluation participants, the method used, the results and recommendations, model schools, and classroom alterations using POE are described. (9 references.) (RE)
Strategies and Challenges for Energy Efficient Retrofitting: Study of the Empire State Building
NASA Astrophysics Data System (ADS)
De, B.; Mukherjee, M.
2013-11-01
Operational and maintenance cost of existing buildings is escalating making it tough for both the owner and the tenants. Retrofitting them with state of the art technologies help them to keep pace with amended recent code provisions and thus extending the older building stocks one more chance to live responsively. Retrofitted iconic buildings can thus retain their status in commerce driven real estate sector. It helps in reducing green house gas emission as well. World's iconic skyscraper, the Empire State Building (ESB), has undergone an exemplary retrofit process since 2008 to reduce its energy demands. To achieve the goal of operational cost and energy consumption reduction, stiff challenges had taken care in a systematic manner to realize benefit throughout the entire lifespan of the ESB. Least disturbances to the tenant and on-site component handling strategies required precise planning. The present paper explores strategies and process adopted for retrofitting the ESB, and derived insightful guidelines towards operational cost savings and energy efficiency of existing buildings through retrofitting.
BIM based virtual environment for fire emergency evacuation.
Wang, Bin; Li, Haijiang; Rezgui, Yacine; Bradley, Alex; Ong, Hoang N
2014-01-01
Recent building emergency management research has highlighted the need for the effective utilization of dynamically changing building information. BIM (building information modelling) can play a significant role in this process due to its comprehensive and standardized data format and integrated process. This paper introduces a BIM based virtual environment supported by virtual reality (VR) and a serious game engine to address several key issues for building emergency management, for example, timely two-way information updating and better emergency awareness training. The focus of this paper lies on how to utilize BIM as a comprehensive building information provider to work with virtual reality technologies to build an adaptable immersive serious game environment to provide real-time fire evacuation guidance. The innovation lies on the seamless integration between BIM and a serious game based virtual reality (VR) environment aiming at practical problem solving by leveraging state-of-the-art computing technologies. The system has been tested for its robustness and functionality against the development requirements, and the results showed promising potential to support more effective emergency management.
Controlling Energy Performance on the Big Stage - The New York Times Company
DOE Office of Scientific and Technical Information (OSTI.GOV)
Settlemyre, Kevin; Regnier, Cindy
2015-08-01
The Times partnered with the U.S. Department of Energy (DOE) as part of DOE’s Commercial Building Partnerships (CBP) Program to develop a post-occupancy evaluation (POE) of three EEMs that were implemented during the construction of The Times building between 2004-2006. With aggressive goals to reduce energy use and carbon emissions at a national level, one strategy of the US Department of Energy is looking to exemplary buildings that have already invested in new approaches to achieving the energy performance goals that are now needed at scale. The Times building incorporated a number of innovative technologies, systems and processes that makemore » their project a model for widespread replication in new and existing buildings. The measured results from the post occupancy evaluation study, the tools and processes developed, and continuous improvements in the performance and cost of the systems studied suggest that these savings are scalable and replicable in a wide range of commercial buildings nationwide.« less
Influence of Building Material Solution of Structures to Effectiveness of Real Estate Development
NASA Astrophysics Data System (ADS)
Somorová, Viera
2015-11-01
Real estate development is in its essence the development process characterized by a considerable dynamics. The purpose of the development process is the creation of buildings which can be either rented by future unknown users or sold in the real estate market. A first part of the paper is dedicated to the analysis of the parameters of buildings solutions considering the future operating costs in a phase of designing. Material solution of external structures is a main factor not only in determining the future operating costs but also in achieving the subsequent economic effectiveness of the real estate development. To determine the relationship between economic efficiency criteria and determine the optimal material variant of building constructions for the specific example is the aim of the second part of paper.
Goal-oriented networks and capacity building for natural hazards - examples in the Dresden region
NASA Astrophysics Data System (ADS)
Hutter, G.
2013-04-01
Networks and networking are important to build social capacities for natural hazards. However, up to now, it is an open question which types of networks contribute to capacity building under certain circumstances. The paper focuses on the type of a goal-oriented network. The distinction between goal orientation and goal directedness is used to show the following: goal directedness of networks to build capacities for natural hazards involves intensive and continuous processes of sensemaking (Weick, 1995) to specify the network goal. This process of specifying an initial goal statement is important in small and large networks. The governance form of a lead organization network facilitates goal specification. The paper illustrates these findings through evidence from two case studies conducted in the Dresden region in Germany.
Social Network Supported Process Recommender System
Ye, Yanming; Yin, Jianwei; Xu, Yueshen
2014-01-01
Process recommendation technologies have gained more and more attention in the field of intelligent business process modeling to assist the process modeling. However, most of the existing technologies only use the process structure analysis and do not take the social features of processes into account, while the process modeling is complex and comprehensive in most situations. This paper studies the feasibility of social network research technologies on process recommendation and builds a social network system of processes based on the features similarities. Then, three process matching degree measurements are presented and the system implementation is discussed subsequently. Finally, experimental evaluations and future works are introduced. PMID:24672309
Wood as a sustainable building material
Robert H. Falk
2009-01-01
Few building materials possess the environmental benefits of wood. It is not only the most widely used building material in the United States but also one with characteristics that make it suitable for a wide range of applications. Efficient, durable, and useful wood products produced from trees range from a minimally processed log at a log-home building site to a...
3. VIEW OF ADDITION TO BUILDING 444. IN THE MID ...
3. VIEW OF ADDITION TO BUILDING 444. IN THE MID 1950s, RADIOGRAPHY VAULTS, A GRAPHITE STORAGE AND CUTTING AREA, AND A GRAPHITE PRODUCTION PROCESSING AREA WERE ADDED TO BUILDING 444. (1956) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO
Suggested Steps for Planning and Building a New School Building.
ERIC Educational Resources Information Center
Oregon State Board of Education, Salem.
Many school board members are inexperienced in the construction process and unaware of the steps to be taken in school building construction. For this reason, this step-by-step outline attempts in a few short paragraphs under each step in the planning, bonding, and building stages to offer suggestions and advice to the school board members.…
Introducing Molecular Life Science Students to Model Building Using Computer Simulations
ERIC Educational Resources Information Center
Aegerter-Wilmsen, Tinri; Kettenis, Dik; Sessink, Olivier; Hartog, Rob; Bisseling, Ton; Janssen, Fred
2006-01-01
Computer simulations can facilitate the building of models of natural phenomena in research, such as in the molecular life sciences. In order to introduce molecular life science students to the use of computer simulations for model building, a digital case was developed in which students build a model of a pattern formation process in…
Systems and methods for data quality control and cleansing
Wenzel, Michael; Boettcher, Andrew; Drees, Kirk; Kummer, James
2016-05-31
A method for detecting and cleansing suspect building automation system data is shown and described. The method includes using processing electronics to automatically determine which of a plurality of error detectors and which of a plurality of data cleansers to use with building automation system data. The method further includes using processing electronics to automatically detect errors in the data and cleanse the data using a subset of the error detectors and a subset of the cleansers.
90. View of scanner building no. 104 showing emplacement process ...
90. View of scanner building no. 104 showing emplacement process for one-half of upper radar switch housing body. RCA Services Company 6 September, 1960, official photograph BMEWS Project by unknown photograph, Photographic Services, Riverton, NJ, BMEWS, clear as negative no. a-1163. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
Image processing occupancy sensor
Brackney, Larry J.
2016-09-27
A system and method of detecting occupants in a building automation system environment using image based occupancy detection and position determinations. In one example, the system includes an image processing occupancy sensor that detects the number and position of occupants within a space that has controllable building elements such as lighting and ventilation diffusers. Based on the position and location of the occupants, the system can finely control the elements to optimize conditions for the occupants, optimize energy usage, among other advantages.
Hegarty, B; Dannemiller, K C; Peccia, J
2018-03-03
Dampness and visible mold growth in homes are associated with negative human health outcomes, but causal relationships between fungal exposure and health are not well established. The purpose of this study was to determine whether dampness in buildings impacts fungal community gene expression and how, in turn, gene expression may modulate human health impacts. A metatranscriptomic study was performed on house dust fungal communities to investigate the expression of genes and metabolic processes in chamber experiments at water activity levels of 0.5, 0.85, and 1.0. Fungi at water activities as low as 0.5 were metabolically active, focusing their transcriptional resources on primary processes essential for cell maintenance. Metabolic complexity increased with water activity where communities at 1.0 displayed more diverse secondary metabolic processes. Greater gene expression at increasing water activity has important implications for human health: Fungal communities at 1.0 a w upregulated a greater number of allergen-, mycotoxin-, and pathogenicity-encoding genes versus communities at 0.85 and 0.5 a w . In damp buildings, fungi may display increases in secondary metabolic processes with the potential for greater per-cell production of allergens, toxins, and pathogenicity. Assessments in wet versus dry buildings that do not account for this elevated health impact may not accurately reflect exposure. © 2018 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
Building new hospitals: a UK infection control perspective.
Stockley, J M; Constantine, C E; Orr, K E
2006-03-01
Infection control input is vital throughout the planning, design and building stages of a new hospital project, and must continue through the commissioning (and decommissioning) process, evaluation and putting the facility into full clinical service. Many hospitals continue to experience problems months or years after occupying the new premises; some of these could have been avoided by infection control involvement earlier in the project. The importance of infection control must be recognized by the chief executive of the hospital trust and project teams overseeing the development. Clinical user groups and contractors must also be made aware of infection control issues. It is vital that good working relationships are built up between the infection control team (ICT) and all these parties. ICTs need the authority to influence the process. This may require their specific recognition by the Private Finance Initiative National Unit, the Department of Health or other relevant authorities. ICTs need training in how to read design plans, how to write effective specifications, and in other areas with which they may be unfamiliar. The importance of documentation and record keeping is paramount. External or independent validation of processes should be available, particularly in commissioning processes. Building design in relation to infection control needs stricter national regulations, allowing ICTs to focus on more local usage issues. Further research is needed to provide evidence regarding the relationship between building design and the prevalence of infection.
Narushima, Miya; Wong, Josephine Pui-Hing; Li, Anda; Sutdhibhasilp, Noulmook
2014-03-01
The Raising Sexually Healthy Children (RSHC) program is a peer-to-peer leadership training program for immigrant parents in Toronto, Canada. It was established in 1998 with the goal of promoting family sex education and parent-child communication. This evaluative study examined the developmental processes and outcomes of the RSHC program to identify the strengths, challenges and insights that can be used to improve the program. It employed a multi-case study approach to compare the RSHC programs delivered in the Chinese, Portuguese and Tamil communities. Data collection methods included focus groups, individual interviews and document analysis. The cross-case analysis identified both common and unique capacity building processes and outcomes in the three communities. In this paper, we report factors that have enhanced and hindered sustainable capacity building at the individual, group/organizational and community levels, and the strategies used by these communities to address challenges common to immigrant families. We will discuss the ecological and synergetic, but time-consuming processes of capacity building, which contributed to the sustainability of RSHC as an empowering health promotion program for immigrant communities. We conclude the paper by noting the implications of using a capacity building approach to promote family health in ethno-racial-linguistic minority communities.
nZEB Renovation of Multi-Storey Building with Prefabricated Modular Panels
NASA Astrophysics Data System (ADS)
Pihelo, P.; Kalamees, T.; Kuusk, K.
2017-10-01
Reduction of energy use in buildings in EU is expected to be reached with help of fulfilling of requirements of low and nearly-zero energy buildings (nZEB) policy. The efficient way to accomplish the purpose of the nZEB is to apply the integrated design process, considering the long-term sustainability and building costs as a one setup. The multi-storey large concrete element building is renovated to nZEB as a Horizon2020 MORE-CONNECT project pilot in Tallinn. The study of that project includes complex of measures: hygrothermal measurements and analysis, highly insulated facade and roof elements, the full modernisation of heating and ventilation systems. Ventilation ducts are installed into the modular panels to minimize supply ductworks in apartments. Roof panels include solar panels and collectors for renewable energy production. All technical systems will be equipped with monitoring systems and data will be logged periodically. The designed thermal transmittance is U≤0.11W/m2K for walls, U≤0.10W/m2K for roof and U≤0.80W/m2K for windows and external doors. The analyse, design and renovation process of the integrated nZEB design method gave us a unique experience, showing weak links in the chain and helping to prevent faults in the whole process in the future.
Kim, Young-Chan; Hong, Won-Hwa; Zhang, Yuan-Long; Son, Byeung-Hun; Seo, Youn-Kyu; Choi, Jun-Ho
2016-01-01
When asbestos containing materials (ACM) must be removed from the building before demolition, additional greenhouse gas (GHG) emissions are generated. However, precedent studies have not considered the removal of ACM from the building. The present study aimed to develop a model for estimating GHG emissions created by the ACM removal processes, specifically the removal of asbestos cement slates (ACS). The second objective was to use the new model to predict the total GHG emission produced by ACM removal in the entire country of Korea. First, an input-equipment inventory was established for each step of the ACS removal process. Second, an energy consumption database for each equipment type was established. Third, the total GHG emission contributed by each step of the process was calculated. The GHG emissions generated from the 1,142,688 ACS-containing buildings in Korea was estimated to total 23,778 tonCO2eq to 132,141 tonCO2eq. This study was meaningful in that the emissions generated by ACS removal have not been studied before. Furthermore, the study deals with additional problems that can be triggered by the presence of asbestos in building materials. The method provided in this study is expected to contribute greatly to the calculation of GHG emissions caused by ACM worldwide. PMID:27626433
Code of Federal Regulations, 2011 CFR
2011-01-01
... domestic market, and for export, for building of reserves, and crops for soil building or conservation... maintenance of food quality after processing. (b) Establishment means an economic unit, generally at a single...
Model-Based Building Detection from Low-Cost Optical Sensors Onboard Unmanned Aerial Vehicles
NASA Astrophysics Data System (ADS)
Karantzalos, K.; Koutsourakis, P.; Kalisperakis, I.; Grammatikopoulos, L.
2015-08-01
The automated and cost-effective building detection in ultra high spatial resolution is of major importance for various engineering and smart city applications. To this end, in this paper, a model-based building detection technique has been developed able to extract and reconstruct buildings from UAV aerial imagery and low-cost imaging sensors. In particular, the developed approach through advanced structure from motion, bundle adjustment and dense image matching computes a DSM and a true orthomosaic from the numerous GoPro images which are characterised by important geometric distortions and fish-eye effect. An unsupervised multi-region, graphcut segmentation and a rule-based classification is responsible for delivering the initial multi-class classification map. The DTM is then calculated based on inpaininting and mathematical morphology process. A data fusion process between the detected building from the DSM/DTM and the classification map feeds a grammar-based building reconstruction and scene building are extracted and reconstructed. Preliminary experimental results appear quite promising with the quantitative evaluation indicating detection rates at object level of 88% regarding the correctness and above 75% regarding the detection completeness.
NASA Astrophysics Data System (ADS)
Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana
2014-11-01
Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.
The analysis of critical cooling rate for high-rise building steel S460
NASA Astrophysics Data System (ADS)
Lu, Shiping; Chen, Xia; Li, Qun; Wang, Haibao; Gu, Linhao
2017-09-01
High-rise building steel S460 is an important structure steel.The product process of the steel is Quenching&Tempering. The critical cooling rate of steel is very important in heavy plate quenching process, and it is also the basis of the cooling process[1].The critical cooling rate of HSLA steel S460 is obtained from the Thermal simulation method,and the differences about the microstructure and properties of different cooling rate is also analyzed.In this article, the angle of the grain boundary and the average grain size are analyzed by EBSD under different cooling rate. The relationship between grain boundary angle and grain size with the cooling rate is obtained. According to the experiment,it provides the basis for the formulation of the quenching process of the industrial production.
Building Budgets and Trust through Superintendent Leadership
ERIC Educational Resources Information Center
Bird, James J.; Wang, Chuang; Murray, Louise M.
2009-01-01
In this study, we surveyed school district superintendents in a southeastern state about their budget-building strategies. The majority of responding superintendents had worked with their most senior principals and business managers for less than three years. Patterns of variance along the openness of budget-building processes, information…
Collaborating in the context of co-location: a grounded theory study.
Wener, Pamela; Woodgate, Roberta L
2016-03-10
Most individuals with mental health concerns seek care from their primary care provider, who may lack comfort, knowledge, and time to provide care. Interprofessional collaboration between providers improves access to primary mental health services and increases primary care providers' comfort offering these services. Building and sustaining interprofessional relationships is foundational to collaborative practice in primary care settings. However, little is known about the relationship building process within these collaborative relationships. The purpose of this grounded theory study was to gain a theoretical understanding of the interprofessional collaborative relationship-building process to guide health care providers and leaders as they integrate mental health services into primary care settings. Forty primary and mental health care providers completed a demographic questionnaire and participated in either an individual or group interview. Interviews were audio-recorded and transcribed verbatim. Transcripts were reviewed several times and then individually coded. Codes were reviewed and similar codes were collapsed to form categories using using constant comparison. All codes and categories were discussed amongst the researchers and the final categories and core category was agreed upon using constant comparison and consensus. A four-stage developmental interprofessional collaborative relationship-building model explained the emergent core category of Collaboration in the Context of Co-location. The four stages included 1) Looking for Help, 2) Initiating Co-location, 3) Fitting-in, and 4) Growing Reciprocity. A patient-focus and communication strategies were essential processes throughout the interprofessional collaborative relationship-building process. Building interprofessional collaborative relationships amongst health care providers are essential to delivering mental health services in primary care settings. This developmental model describes the process of how these relationships are co-created and supported by the health care region. Furthermore, the model emphasizes that all providers must develop and sustain a patient-focus and communication strategies that are flexible. Applying this model, health care providers can guide the creation and sustainability of primary care interprofessional collaborative relationships. Moreover, this model may guide health care leaders and policy makers as they initiate interprofessional collaborative practice in other health care settings.
WAN Optimization: A Business Process Reengineering and Knowledge Value Added Approach
2011-03-01
processing is not affected. Reliability The Customer or Order systems are unavailable. If either fails, order processing halts and alerts are...online immediately, and sends a fax to the customer who orders the container. The whole order processing process can be completed in one day. IT plays...Messages build up in the OrderQ until the email server restarts. Messages are then sent by the SendEmail component to remove the backlog. Order
28. PENTHOUSE, ROOM 3005, LOOKING SOUTHWEST THROUGH DOUBLE DOORS. NORTH ...
28. PENTHOUSE, ROOM 3005, LOOKING SOUTHWEST THROUGH DOUBLE DOORS. NORTH SIDE OF BUILDING. - Hughes Aircraft Company, Processing & Electronics Building, 6775 Centinela Avenue, Los Angeles, Los Angeles County, CA
NASA Astrophysics Data System (ADS)
Zhang, Jun; Li, Ri Yi
2018-06-01
Building energy simulation is an important supporting tool for green building design and building energy consumption assessment, At present, Building energy simulation software can't meet the needs of energy consumption analysis and cabinet level micro environment control design of prefabricated building. thermal physical model of prefabricated building is proposed in this paper, based on the physical model, the energy consumption calculation software of prefabricated cabin building(PCES) is developed. we can achieve building parameter setting, energy consumption simulation and building thermal process and energy consumption analysis by PCES.
OVERVIEW OF REMAINS OF DEWATERING BUILDING, LOOKING SOUTH TOWARD CYANIDE ...
OVERVIEW OF REMAINS OF DEWATERING BUILDING, LOOKING SOUTH TOWARD CYANIDE PROCESSING AREA. WATER USED IN PROCESSING AT THE STAMP MILL WAS CIRCULATED HERE FOR RECLAMATION. SANDS WERE SETTLED OUT AND DEPOSITED IN ONE OF TWO TAILINGS HOLDING AREAS. CLEARED WATER WAS PUMPED BACK TO THE MILL FOR REUSE. THIS PROCESS WAS ACCOMPLISHED BY THE USE OF SETTLING CONES, EIGHT FEET IN DIAMETER AND SIX FEET HIGH. THE REMAINS OF FOUR CONES ARE AT CENTER, BEHIND THE TANK IN THE FOREGROUND. TO THE LEFT IS THE MAIN ACCESS ROAD BETWEEN THE MILL AND THE PARKING LOT. - Keane Wonder Mine, Park Route 4 (Daylight Pass Cutoff), Death Valley Junction, Inyo County, CA
Exploitation and Benefits of BIM in Construction Project Management
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
The Primary Physical Education Curriculum Process: More Complex That You Might Think!!
ERIC Educational Resources Information Center
Jess, Mike; Carse, Nicola; Keay, Jeanne
2016-01-01
In this paper, we present the curriculum development process as a complex, iterative and integrated phenomenon. Building on the early work of Stenhouse [1975, "An Introduction to Curriculum Research and Development". London: Heinemann Educational], we position the teacher at the heart of this process and extend his ideas by exploring how…
Building a Culture of Engagement through Participatory Feedback Processes
ERIC Educational Resources Information Center
Hatchimonji, Danielle R.; Linsky, Arielle V.; DeMarchena, Sarah; Nayman, Samuel J.; Kim, Sarah; Elias, Maurice J.
2018-01-01
In response to school environments in which teachers and students feel disconnected from the learning process, we developed a three-part curriculum feedback system with the goal of creating a school-wide culture of engagement through participatory feedback processes. Here we describe the barriers to participation and ownership that are addressed…
ERIC Educational Resources Information Center
Stanford, Linda
This course curriculum is intended for use by community college insructors and administrators in implementing an advanced information processing course. It builds on the skills developed in the previous information processing course but goes one step further by requiring students to perform in a simulated office environment and improve their…
AERIAL SHOWING COMPLETED REMOTE ANALYTICAL FACILITY (CPP627) ADJOINING FUEL PROCESSING ...
AERIAL SHOWING COMPLETED REMOTE ANALYTICAL FACILITY (CPP-627) ADJOINING FUEL PROCESSING BUILDING AND EXCAVATION FOR HOT PILOT PLANT TO RIGHT (CPP-640). INL PHOTO NUMBER NRTS-60-1221. J. Anderson, Photographer, 3/22/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Process Consultation: Its Role in Organization Development.
ERIC Educational Resources Information Center
Schein, Edgar H.
This volume focuses on the process by which the consultant builds readiness for organizational development (OD) programs, actually conducts training, and works with the key individuals of an organization as part of an OD program. Part I describes in some detail the human processes in organizations--communication, functional roles of group members,…
The Facilities Audit. A Process for Improving Facilities Conditions.
ERIC Educational Resources Information Center
Kaiser, Harvey H.
The problems of deferred maintenance and decaying campus infrastructure have troubled higher education for the past two decades. This book, designed to be a tool for facilities managers, describes a process for inspecting and reporting conditions of buildings and infrastructure. The audit process is meant to be a routine part of maintenance…
50% Advanced Energy Design Guides: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bonnema, E.; Leach, M.; Pless, S.
2012-07-01
This paper presents the process, methodology, and assumptions for the development of the 50% Energy Savings Advanced Energy Design Guides (AEDGs), a design guidance document that provides specific recommendations for achieving 50% energy savings above the requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004 in four building types: (1) Small to medium office buildings, (2) K-12 school buildings, (3) Medium to big box retail buildings, (4) Large hospital buildings.
2012-07-01
Information Modeling ( BIM ) is the process of generating and managing building data during a facility’s entire life cycle. New BIM standards for...cycle Building Information Modeling ( BIM ) as a new standard for building information data repositories can serve as the foun- dation for automation and... Building Information Modeling ( BIM ) is defined as “a digital representa- tion of physical and functional
Layerwise Monitoring of the Selective Laser Melting Process by Thermography
NASA Astrophysics Data System (ADS)
Krauss, Harald; Zeugner, Thomas; Zaeh, Michael F.
Selective Laser Melting is utilized to build parts directly from CAD data. In this study layerwise monitoring of the temperature distribution is used to gather information about the process stability and the resulting part quality. The heat distribution varies with different kinds of parameters including scan vector length, laser power, layer thickness and inter-part distance in the job layout. By integration of an off-axis mounted uncooled thermal detector, the solidification as well as the layer deposition are monitored and evaluated. This enables the identification of hot spots in an early stage during the solidification process and helps to avoid process interrupts. Potential quality indicators are derived from spatially resolved measurement data and are correlated to the resulting part properties. A model of heat dissipation is presented based on the measurement of the material response for varying heat input. Current results show the feasibility of process surveillance by thermography for a limited section of the building platform in a commercial system.
2. VIEW LOOKING NORTHEAST AT BUILDING 444 UNDER CONSTRUCTION. BUILDING ...
2. VIEW LOOKING NORTHEAST AT BUILDING 444 UNDER CONSTRUCTION. BUILDING 444 WAS THE PRIMARY NON-PLUTONIUM MANUFACTURING FACILITY AT THE ROCKY FLATS PLANT. MANUFACTURING PROCESSES COMPLETED IN THIS BUILDING WERE USED TO FABRICATE WEAPONS COMPONENTS AND ASSEMBLIES FOR A VARIETY OF MATERIALS, INCLUDING DEPLETED URANIUM, BERYLLIUM, STAINLESS STEEL, ALUMINUM, AND VANADIUM. (4/25/52) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lin, Guanjing; Granderson, J.; Brambley, Michael R.
2015-07-01
In the United States, small commercial buildings represent 51% of total floor space of all commercial buildings and consume nearly 3 quadrillion Btu (3.2 quintillion joule) of site energy annually, presenting an enormous opportunity for energy savings. Retro-commissioning (RCx), the process through which professional energy service providers identify and correct operational problems, has proven to be a cost-effective means to achieve median energy savings of 16%. However, retro-commissioning is not typically conducted at scale throughout the commercial stock. Very few small commercial buildings are retro-commissioned because utility expenses are relatively modest, margins are tighter, and capital for improvements is limited.more » In addition, small buildings do not have in-house staff with the expertise to identify improvement opportunities. In response, a turnkey hardware-software solution was developed to enable cost-effective, monitoring-based RCx of small commercial buildings. This highly tailored solution enables non-commissioning providers to identify energy and comfort problems, as well as associated cost impacts and remedies. It also facilitates scale by offering energy service providers the means to streamline their existing processes and reduce costs by more than half. The turnkey RCx sensor suitcase consists of two primary components: a suitcase of sensors for short-term building data collection that guides users through the process of deploying and retrieving their data and a software application that automates analysis of sensor data, identifies problems and generates recommendations. This paper presents the design and testing of prototype models, including descriptions of the hardware design, analysis algorithms, performance testing, and plans for dissemination.« less
Riley, Bettina H; Dearmon, Valorie; Mestas, Lisa; Buckner, Ellen B
2016-01-01
Improving health care quality is the responsibility of nurses at all levels of the organization. This article describes a study that examined frontline staff nurses' professional practice characteristics to advance leadership through the understanding of relationships among practice environment, quality improvement, and outcomes. The study design was a descriptive quantitative design at 2 time points. Findings support the use of research and quality processes to build leadership capacity required for positive resolution of interdisciplinary operational failures.
VIEW OF THE INTERIOR OF BUILDING 125, THE STANDARDS LABORATORY. ...
VIEW OF THE INTERIOR OF BUILDING 125, THE STANDARDS LABORATORY. THE PRIMARY FUNCTION OF THE STANDARDS LABORATORY WAS TO ENSURE AND IMPLEMENT A SYSTEM OF QUALITY CONTROL FOR INCOMING MATERIALS USED IN MANUFACTURING PROCESSES. SEVERAL ENGINEERING CONTROLS WERE USED TO ASSURE ACCURACY OF THE CALIBRATION PROCESSES INCLUDING: FLEX-FREE GRANITE TABLES, AIR LOCKED DOORS, TEMPERATURE CONTROLS, AND A SUPER-CLEAN ENVIRONMENT - Rocky Flats Plant, Standards Laboratory, Immediately north of 215A water tower & adjacent to Third Street, Golden, Jefferson County, CO
1982-12-01
features to understand the processes that created them and the patterns they make on the earth’s surface. The dwelling house is impor- tant to the...chimneys. The American frontier settlement process included an initial, or pioneer, phase of adjustment that employed whatever knowledge and re- sources...Modular construction employed in Britain was based upon the one-bay house of the Middle Ages (Field 1965). Buildings, as well as language and conmmon
Ideas that Work!. Retuning the Building Automation System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parker, Steven
A building automation system (BAS) can save considerable energy by effectively and efficiently operating building energy systems (fans, pumps, chillers boilers, etc.), but only when the BAS is properly set up and operated. Tuning, or retuning, the BAS is a cost effective process worthy of your time and attention.
Can the Computer Design a School Building?
ERIC Educational Resources Information Center
Roberts, Charles
The implications of computer technology and architecture are discussed with reference to school building design. A brief introduction is given of computer applications in other fields leading to the conclusions that computers alone cannot design school buildings but may serve as a useful tool in the overall design process. Specific examples are…
Building Face Composites Can Harm Lineup Identification Performance
ERIC Educational Resources Information Center
Wells, Gary L.; Charman, Steve D.; Olson, Elizabeth A.
2005-01-01
Face composite programs permit eyewitnesses to build likenesses of target faces by selecting facial features and combining them into an intact face. Research has shown that these composites are generally poor likenesses of the target face. Two experiments tested the proposition that this composite-building process could harm the builder's memory…
Making Visionary Design Work at Policy Level and in Practice
ERIC Educational Resources Information Center
Burgdorff, Frauke
2011-01-01
Good architecture responds to contemporary challenges, irrespective of fashionable trends, and is characterised by rigorous building processes. Office buildings, housing, stadiums and theatres offer outstanding examples of this principle. But do school buildings figure among them? Happily, in Germany they do, although they are still too rare. This…
Building Budgets and Trust through the Alchemy of Superintendent Leadership
ERIC Educational Resources Information Center
Bird, James J.
2010-01-01
Superintendents have the burden and the opportunity to exert leadership through the budget-building process. This article details a dozen tenets which can be implemented by practicing superintendents. Doing so increases the chances of building trust among the stakeholders of administrators, staff, community, and school board members. The district…
PRACTICAL EXPERIENCES WITH TECHNOLOGIES FOR DECONTAMINATION OF B. ANTHRACIS IN LARGE BUILDINGS.
In the Fall of 2001 a number of buildings were contaminated with B. anthracis (B.A.) from letters processed through United States Postal Service and other mail handling facilities. All of the buildings have now been decontaminated using a variety of technologies. In a number of...
Use of expert judgment elicitation to estimate seismic vulnerability of selected building types
Jaiswal, K.S.; Aspinall, W.; Perkins, D.; Wald, D.; Porter, K.A.
2012-01-01
Pooling engineering input on earthquake building vulnerability through an expert judgment elicitation process requires careful deliberation. This article provides an overview of expert judgment procedures including the Delphi approach and the Cooke performance-based method to estimate the seismic vulnerability of a building category.
INTERIOR OF SHT (ROTARY DRYER FOR SODA) BUILDING OR DRYSIDE ...
INTERIOR OF SHT (ROTARY DRYER FOR SODA) BUILDING OR DRYSIDE DRYERS WHICH REMOVED TRACES OF LIQUID FROM STD FILTRATE. HEAT CONVERTED SODIUM BICARBONATE TO SODIUM CARBONATE OR SODA ASH, THE PRINCIPAL PRODUCT OF THE WORKS. - Solvay Process Company, SHT Building, Between Willis & Milton Avenues, Solvay, Onondaga County, NY
Intelligent seismic risk mitigation system on structure building
NASA Astrophysics Data System (ADS)
Suryanita, R.; Maizir, H.; Yuniorto, E.; Jingga, H.
2018-01-01
Indonesia located on the Pacific Ring of Fire, is one of the highest-risk seismic zone in the world. The strong ground motion might cause catastrophic collapse of the building which leads to casualties and property damages. Therefore, it is imperative to properly design the structural response of building against seismic hazard. Seismic-resistant building design process requires structural analysis to be performed to obtain the necessary building responses. However, the structural analysis could be very difficult and time consuming. This study aims to predict the structural response includes displacement, velocity, and acceleration of multi-storey building with the fixed floor plan using Artificial Neural Network (ANN) method based on the 2010 Indonesian seismic hazard map. By varying the building height, soil condition, and seismic location in 47 cities in Indonesia, 6345 data sets were obtained and fed into the ANN model for the learning process. The trained ANN can predict the displacement, velocity, and acceleration responses with up to 96% of predicted rate. The trained ANN architecture and weight factors were later used to build a simple tool in Visual Basic program which possesses the features for prediction of structural response as mentioned previously.
Establishing a Common Definition for Zero Energy Buildings: Time to Move the Market
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, Kent; Torcellini, Paul; Taylor, Cody
To change the current paradigm from buildings being consumers of energy to producers of energy requires a common language to facilitate market transformation. Common definitions help create market movement by sharing concepts across market actors. While the term 'zero energy buildings' has been in the marketplace for over 20 years, no common definition had been established. US DOE, last year, embarked on a process to evaluate current definitions and solicit industry input to formulate a common definition and nomenclature for zero energy buildings. This definition uses commonly available site measurements and national conversion factors to define zero energy buildings onmore » a source energy basis for a variety of boundary conditions including building, portfolio, campus, and community. Issues addressed include multiple fuel types, cogeneration, and renewable energy certificates. This paper describes the process used to arrive at the definition, looks at methods of calculating site to source energy conversions, and how boundary decisions affect a robust and stable definition that can be used to direct programs and policies for many years to come. This stability is critical to move building investments towards buildings that produce as much energy as they consume.« less
23 CFR 636.304 - What process may be used to rate and score proposals?
Code of Federal Regulations, 2010 CFR
2010-04-01
... ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation Factors § 636.304 What process... any rating method or combination of methods including color or adjectival ratings, numerical weights...
Improving the Interagency Conflict Assessment Framework (ICAF) with Intellectual Habits
2012-06-08
27 Figure 4. Parson’s Fundamental Matrix of Explanation of Action .................................32 Figure...peace building process. Reconciliation, which is the process by which relationships are built between conflicting groups, must manage three paradoxes
Alternative contracting research : [project summary].
DOT National Transportation Integrated Search
2016-09-01
To conserve taxpayer money, many governmental agencies use a low-bid process for design : and construction services. The Florida Department of Transportations (FDOT) Design-Bid-Build : process falls in this category. However, a low-bid approach do...
NASA Astrophysics Data System (ADS)
Ern, Peniel Ang Soon; Kasim, Narimah; Hamid, Zuhairi Abd; Chen, Goh Kai
2017-10-01
Industrialized Building System (IBS) is one of the approaches that had been introduced as an alternative to conventional building method where it becomes the new strategy of enhancing the sustainable construction in current industries while spearheading a huge advancement of benefits with green constructions into the existing industries. The IBS approach is actively promoted through several strategies and incentives as an alternative to conventional building methods. Extensive uptakes of modern Information Communication Technology (ICT) applications are able to support the different IBS processes for effective production. However, it is argued that ICT uptake at the organisational level is still in its infancy. This raises the importance to identify critical inhibitors which are inhibing the effective uptake of ICT in the IBS production management process. Critical inhibitors to ICT uptake were identified through questionnaire survey with the IBS industry stakeholders. The mean index and critical t-values are generated with the use of the quantitative tool, Statistical Package for Social Sciences (SPSS). The top ten priority ranked inhibitors reflect the Cost, People and Process elements to ICT uptake. High costs in acquiring the technologies and resistance to change were some main concerns from the findings.
Social capital to strengthen health policy and health systems.
Ogden, Jessica; Morrison, Ken; Hardee, Karen
2014-12-01
This article recounts the development of a model for social capital building developed over the course of interventions focused on HIV-related stigma and discrimination, safe motherhood and reproductive health. Through further engagement with relevant literature, it explores the nature of social capital and suggests why undertaking such a process can enhance health policy and programmes, advocacy and governance for improved health systems strengthening (HSS) outcomes. The social capital process proposed facilitates the systematic and effective inclusion of community voices in the health policy process-strengthening programme effectiveness as well as health system accountability and governance. Because social capital building facilitates communication and the uptake of new ideas, norms and standards within and between professional communities of practice, it can provide an important mechanism for integration both within and between sectors-a process long considered a 'wicked problem' for health policy-makers. The article argues that the systematic application of social capital building, from bonding through bridging into linking social capital, can greatly enhance the ability of governments and their partners to achieve their HSS goals. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine © The Author 2013; all rights reserved.
Microgravity Manufacturing Via Fused Deposition
NASA Technical Reports Server (NTRS)
Cooper, K. G.; Griffin, M. R.
2003-01-01
Manufacturing polymer hardware during space flight is currently outside the state of the art. A process called fused deposition modeling (FDM) can make this approach a reality by producing net-shaped components of polymer materials directly from a CAE model. FDM is a rapid prototyping process developed by Stratasys, Inc.. which deposits a fine line of semi-molten polymer onto a substrate while moving via computer control to form the cross-sectional shape of the part it is building. The build platen is then lowered and the process is repeated, building a component directly layer by layer. This method enables direct net-shaped production of polymer components directly from a computer file. The layered manufacturing process allows for the manufacture of complex shapes and internal cavities otherwise impossible to machine. This task demonstrated the benefits of the FDM technique to quickly and inexpensively produce replacement components or repair broken hardware in a Space Shuttle or Space Station environment. The intent of the task was to develop and fabricate an FDM system that was lightweight, compact, and required minimum power consumption to fabricate ABS plastic hardware in microgravity. The final product of the shortened task turned out to be a ground-based breadboard device, demonstrating miniaturization capability of the system.
NASA Technical Reports Server (NTRS)
Guodace, Kimberly A.
2010-01-01
This slide presentation details shuttle processing flow which starts with wheel stop and ends with launching. The flow is from landing the orbiter is rolled into the Orbiter Processing Facility (OPF), where processing is performed, it is then rolled over to the Vehicle Assembly Building (VAB) where it is mated with the propellant tanks, and payloads are installed. A different flow is detailed if the weather at Kennedy Space Center requires a landing at Dryden.
NASA Astrophysics Data System (ADS)
Bennadji, A.
2013-07-01
The North East of Scotland's construction method is similar to most popular building typologies in the UK. This typology can vary in term of external material (Granite, brick or stone) but with a secondary, usually timber sub frame with a lining on its interior. Insulation was seldom a consideration when such buildings were completed. Statistics shows that 80% of existing buildings in the UK will need to be upgraded. The lack of knowledge in dealing with old building fabric's manipulation has a negative impact on buildings' integrity. The documentation of such process seems to be an important step that buildings' actors should undertake to communicate a practical knowledge that is still at incubation stage. We wanted for this documentation to be visual, as descriptions might mislead none specialised and specialised in the field due to the innovative approach our method was conducted with. For the Scottish context this research/experiment will concentrate on existing granite wall buildings with plastered lath internal wall. It is unfortunate to see the commonly beautiful interiors of Scottish buildings disappearing, when the internal linings are removed. Skips are filled with old Plaster and Lath and new linings have to be supplied and fitted. Excessive waste is created in this change. This paper is based on a historic building energy improvement case study financed by the European commission and the Scottish Government. The pilot study consists of insulating an 18th century house using an innovative product and method. The project was a response to a call by the CIC start (Construction Innovation Club), aiming to establish a link between SMEs and the Universities. The project saw the day in collaboration with Icynene Canada, KDL Kishorn (see full list in the acknowledgment). This paper describes the process through which the team went through to improve the building envelope without damaging the buildings original features (Loveday et all). The energy efficiency improvement consists on improving the walls U-val by introducing an insulation material Icynene (Sadineni, France & Boehm 2011) into the cavity wall. The U-val was improved by 50% and no redecoration was needed after the operation and no disturbance to the building's occupants.
Adaptive vibration control of structures under earthquakes
NASA Astrophysics Data System (ADS)
Lew, Jiann-Shiun; Juang, Jer-Nan; Loh, Chin-Hsiung
2017-04-01
techniques, for structural vibration suppression under earthquakes. Various control strategies have been developed to protect structures from natural hazards and improve the comfort of occupants in buildings. However, there has been little development of adaptive building control with the integration of real-time system identification and control design. Generalized predictive control, which combines the process of real-time system identification and the process of predictive control design, has received widespread acceptance and has been successfully applied to various test-beds. This paper presents a formulation of the predictive control scheme for adaptive vibration control of structures under earthquakes. Comprehensive simulations are performed to demonstrate and validate the proposed adaptive control technique for earthquake-induced vibration of a building.
Hollow-Wall Heat Shield for Fuel Injector Component
NASA Technical Reports Server (NTRS)
Hanson, Russell B. (Inventor)
2018-01-01
A fuel injector component includes a body, an elongate void and a plurality of bores. The body has a first surface and a second surface. The elongate void is enclosed by the body and is integrally formed between portions of the body defining the first surface and the second surface. The plurality of bores extends into the second surface to intersect the elongate void. A process for making a fuel injector component includes building an injector component body having a void and a plurality of ports connected to the void using an additive manufacturing process that utilizes a powdered building material, and removing residual powdered building material from void through the plurality of ports.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1977-08-01
Documents relevant to the development and implementation of the California energy insulation standards for new residential buildings were evaluated and a survey was conducted to determine problems encountered in the implementation, enforcement, and design aspects of the standards. The impact of the standards on enforcement agencies, designers, builders and developers, manufacturers and suppliers, consumers, and the building process in general is summarized. The impact on construction costs and energy savings varies considerably because of the wide variation in prior insulation practices and climatic conditions in California. The report concludes with a series of recommendations covering all levels of government andmore » the building process. (MCW)« less
Research Advances on Fabricated Shear Wall System
NASA Astrophysics Data System (ADS)
Liu, Xudong; Wang, Donghui; Wang, Sheng; Zhai, Yu
2018-03-01
With the rapid development of the construction industry, building energy consumption has been increasing, has become a problem that can not be ignored. It is imperative to develop energy-saving buildings. A new type of prefabricated shear wall is assembled and partially assembled by prefabricated parts, and some concrete is spliced together. The new structure has good integrity, seismic resistance and excellent energy saving and environmental protection performance. It reduces building energy consumption to a great extent. Therefore, the design method, manufacturing process, site assembly process and key technical problems of the system are discussed. For the construction industry gradually entered the energy conservation, environmental protection, safety and durability of sustainable development laid the foundation.
NASA Astrophysics Data System (ADS)
Venkrbec, Vaclav; Bittnerova, Lucie
2017-12-01
Building information modeling (BIM) can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.
Goal-oriented networks and capacity building for natural hazards - examples in the Dresden region
NASA Astrophysics Data System (ADS)
Hutter, G.
2014-01-01
Networks and networking are important for building social capacities for natural hazards. However, up to now, it has been an open question which types of networks contribute to capacity building under certain circumstances. The paper focuses on the type of a goal-oriented network. The distinction between goal orientation and goal directedness is used to show the following: goal directedness of networks to build capacities for natural hazards involves intensive and continuous processes of "sensemaking" (Weick, 1995) to specify the network goal. This process of specifying an initial goal statement is important in small and large networks at the regional level. The governance form of a lead organization network facilitates goal specification. The paper illustrates these findings through evidence from two case studies conducted in the Dresden region in Germany.
Research on key technologies of data processing in internet of things
NASA Astrophysics Data System (ADS)
Zhu, Yangqing; Liang, Peiying
2017-08-01
The data of Internet of things (IOT) has the characteristics of polymorphism, heterogeneous, large amount and processing real-time. The traditional structured and static batch processing method has not met the requirements of data processing of IOT. This paper studied a middleware that can integrate heterogeneous data of IOT, and integrated different data formats into a unified format. Designed a data processing model of IOT based on the Storm flow calculation architecture, integrated the existing Internet security technology to build the Internet security system of IOT data processing, which provided reference for the efficient transmission and processing of IOT data.
Identifying Populace Susceptible to Flooding Using ArcGIS and Remote Sensing Datasets
NASA Astrophysics Data System (ADS)
Fernandez, Sim Joseph; Milano, Alan
2016-07-01
Remote sensing technologies are growing vastly as with its various applications. The Department of Science and Technology (DOST), Republic of the Philippines, has made projects exploiting LiDAR datasets from remote sensing technologies. The Phil-LiDAR 1 project of DOST is a flood hazard mapping project. Among the project's objectives is the identification of building features which can be associated to the flood-exposed population. The extraction of building features from the LiDAR dataset is arduous as it requires manual identification of building features on an elevation map. The mapping of building footprints is made meticulous in order to compensate the accuracy between building floor area and building height both of which are crucial in flood decision making. A building identification method was developed to generate a LiDAR derivative which will serve as a guide in mapping building footprints. The method utilizes several tools of a Geographic Information System (GIS) software called ArcGIS which can operate on physical attributes of buildings such as roofing curvature, slope and blueprint area in order to obtain the LiDAR derivative from LiDAR dataset. The method also uses an intermediary process called building removal process wherein buildings and other features lying below the defined minimum building height - 2 meters in the case of Phil-LiDAR 1 project - are removed. The building identification method was developed in the hope to hasten the identification of building features especially when orthophotographs and/or satellite imageries are not made available.
Feature integration and object representations along the dorsal stream visual hierarchy
Perry, Carolyn Jeane; Fallah, Mazyar
2014-01-01
The visual system is split into two processing streams: a ventral stream that receives color and form information and a dorsal stream that receives motion information. Each stream processes that information hierarchically, with each stage building upon the previous. In the ventral stream this leads to the formation of object representations that ultimately allow for object recognition regardless of changes in the surrounding environment. In the dorsal stream, this hierarchical processing has classically been thought to lead to the computation of complex motion in three dimensions. However, there is evidence to suggest that there is integration of both dorsal and ventral stream information into motion computation processes, giving rise to intermediate object representations, which facilitate object selection and decision making mechanisms in the dorsal stream. First we review the hierarchical processing of motion along the dorsal stream and the building up of object representations along the ventral stream. Then we discuss recent work on the integration of ventral and dorsal stream features that lead to intermediate object representations in the dorsal stream. Finally we propose a framework describing how and at what stage different features are integrated into dorsal visual stream object representations. Determining the integration of features along the dorsal stream is necessary to understand not only how the dorsal stream builds up an object representation but also which computations are performed on object representations instead of local features. PMID:25140147
Andújar-Montoya, María Dolores
2017-01-01
The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work environment during the execution of tasks. Therefore, the high percentage of defects detected in buildings that have the root cause in the construction phase could be avoidable with a more accurate and efficient control of the process. The present work proposes a novel integration model based on information and communications technologies for the automation of both construction work and its management at the execution phase, specifically focused on the flat roof construction process. Roofs represent the second area where more defects are claimed. The proposed model is based on a Web system, supported by a service oriented architecture, for the integral management of tasks through the Last Planner System methodology, but incorporating the management of task restrictions from the physical environment variables by designing specific sensing systems. Likewise, all workers are integrated into the management process by Internet-of-Things solutions that guide them throughout the execution process in a non-intrusive and transparent way. PMID:28737693
Andújar-Montoya, María Dolores; Marcos-Jorquera, Diego; García-Botella, Francisco Manuel; Gilart-Iglesias, Virgilio
2017-07-22
The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work environment during the execution of tasks. Therefore, the high percentage of defects detected in buildings that have the root cause in the construction phase could be avoidable with a more accurate and efficient control of the process. The present work proposes a novel integration model based on information and communications technologies for the automation of both construction work and its management at the execution phase, specifically focused on the flat roof construction process. Roofs represent the second area where more defects are claimed. The proposed model is based on a Web system, supported by a service oriented architecture, for the integral management of tasks through the Last Planner System methodology, but incorporating the management of task restrictions from the physical environment variables by designing specific sensing systems. Likewise, all workers are integrated into the management process by Internet-of-Things solutions that guide them throughout the execution process in a non-intrusive and transparent way.
A strategic value management approach for energy and maintenance management in a building
NASA Astrophysics Data System (ADS)
Nawi, Mohd Nasrun Mohd; Dahlan, Nofri Yenita; Nadarajan, Santhirasegaran
2015-05-01
Fragmentation process is always been highlighted by the stakeholders in the construction industry as one of the `critical' issue that diminishing the opportunity for stakeholders that involved during the operation and maintenance stage to influence design decisions. Failure of design professionals to consider how a maintenance contractor or facility manager will construct the design thus results in higher operating cost, wastage, defects during the maintenance and operation process. Moving towards team integration is considered a significant strategy for overcoming the issue. Value Management is a style of management dedicated to guiding people and promoting innovation with the aim to improve overall building performance through structured, team-oriented exercises which make explicit, and appraise subsequent decisions, by reference to the value requirements of the clients. Accordingly, this paper discusses the fragmentation issue in more detail including the definition, causes and effects to the maintenance and operation of building and at the same time will highlighted the potential of VM integrated team approach as a strategic management approach for overcoming that issue. It also explores that the team integration strategy alleviates scheduling problems, delays and disputes during the construction process, and, hence, prevent harming the overall building performance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Guan, Xuefei; Zhou, S. Kevin; Rasselkorde, El Mahjoub
The study presents a data processing methodology for weld build-up using multiple scan patterns. To achieve an overall high probability of detection for flaws with different orientations, an inspection procedure with three different scan patterns is proposed. The three scan patterns are radial-tangential longitude wave pattern, axial-radial longitude wave pattern, and tangential shear wave pattern. Scientific fusion of the inspection data is implemented using volume reconstruction techniques. The idea is to perform spatial domain forward data mapping for all sampling points. A conservative scheme is employed to handle the case that multiple sampling points are mapped to one grid location.more » The scheme assigns the maximum value for the grid location to retain the largest equivalent reflector size for the location. The methodology is demonstrated and validated using a realistic ring of weld build-up. Tungsten balls and bars are embedded to the weld build-up during manufacturing process to represent natural flaws. Flat bottomed holes and side drilled holes are installed as artificial flaws. Automatic flaw identification and extraction are demonstrated. Results indicate the inspection procedure with multiple scan patterns can identify all the artificial and natural flaws.« less
NASA Astrophysics Data System (ADS)
Guan, Xuefei; Rasselkorde, El Mahjoub; Abbasi, Waheed; Zhou, S. Kevin
2015-03-01
The study presents a data processing methodology for weld build-up using multiple scan patterns. To achieve an overall high probability of detection for flaws with different orientations, an inspection procedure with three different scan patterns is proposed. The three scan patterns are radial-tangential longitude wave pattern, axial-radial longitude wave pattern, and tangential shear wave pattern. Scientific fusion of the inspection data is implemented using volume reconstruction techniques. The idea is to perform spatial domain forward data mapping for all sampling points. A conservative scheme is employed to handle the case that multiple sampling points are mapped to one grid location. The scheme assigns the maximum value for the grid location to retain the largest equivalent reflector size for the location. The methodology is demonstrated and validated using a realistic ring of weld build-up. Tungsten balls and bars are embedded to the weld build-up during manufacturing process to represent natural flaws. Flat bottomed holes and side drilled holes are installed as artificial flaws. Automatic flaw identification and extraction are demonstrated. Results indicate the inspection procedure with multiple scan patterns can identify all the artificial and natural flaws.
High-rate, roll-to-roll nanomanufacturing of flexible systems
NASA Astrophysics Data System (ADS)
Cooper, Khershed P.; Wachter, Ralph F.
2012-10-01
Since the National Nanotechnology Initiative was first announced in 2000, nanotechnology has developed an impressive catalog of nano-scale structures with building-blocks such as nanoparticles, nanotubes, nanorods, nanopillars, and quantum dots. Similarly, there are accompanying materials processes such as, atomic layer deposition, pulsed layer deposition, nanoprinting, nanoimprinting, transfer printing, nanolithography and nanopatterning. One of the challenges of nanomanufacturing is scaling up these processes reliably and affordably. Roll-to-roll manufacturing is a means for scaling up, for increasing throughput. It is high-speed production using a continuous, moving platform such as a web or a flexible substrate. The adoption of roll-to-roll to nanomanufacturing is novel. The goal is to build structures and devices with nano-scale features and specific functionality. The substrate could be a polymer, metal foil, silk, cloth or paper. The materials to build the structures and multi-level devices could be organic, inorganic or biological. Processing could be solution-based, e.g., ink-jet printing, or vacuum-based, e.g., chemical vapor deposition. Products could be electronics, optoelectronics, membranes, catalysts, microfluidics, lab-on-film, filters, etc. By this means, processing of large and conformal areas is achievable. High-throughput translates into low cost, which is the attraction of roll-to-roll nanomanufacturing. There are technical challenges requiring fundamental scientific advances in materials and process development and in manufacturing and system-integration where achieving nano-scale feature size, resolution and accuracy at high speeds can be major hurdles. We will give an overview of roll-to-roll nanomanufacturing with emphasis on the need to understand the material, process and system complexities, the need for instrumentation, measurement, and process control and describe the concept of cyber-enabled nanomanufacturing for reliable and predictable production.
Rapid Disaster Damage Estimation
NASA Astrophysics Data System (ADS)
Vu, T. T.
2012-07-01
The experiences from recent disaster events showed that detailed information derived from high-resolution satellite images could accommodate the requirements from damage analysts and disaster management practitioners. Richer information contained in such high-resolution images, however, increases the complexity of image analysis. As a result, few image analysis solutions can be practically used under time pressure in the context of post-disaster and emergency responses. To fill the gap in employment of remote sensing in disaster response, this research develops a rapid high-resolution satellite mapping solution built upon a dual-scale contextual framework to support damage estimation after a catastrophe. The target objects are building (or building blocks) and their condition. On the coarse processing level, statistical region merging deployed to group pixels into a number of coarse clusters. Based on majority rule of vegetation index, water and shadow index, it is possible to eliminate the irrelevant clusters. The remaining clusters likely consist of building structures and others. On the fine processing level details, within each considering clusters, smaller objects are formed using morphological analysis. Numerous indicators including spectral, textural and shape indices are computed to be used in a rule-based object classification. Computation time of raster-based analysis highly depends on the image size or number of processed pixels in order words. Breaking into 2 level processing helps to reduce the processed number of pixels and the redundancy of processing irrelevant information. In addition, it allows a data- and tasks- based parallel implementation. The performance is demonstrated with QuickBird images captured a disaster-affected area of Phanga, Thailand by the 2004 Indian Ocean tsunami are used for demonstration of the performance. The developed solution will be implemented in different platforms as well as a web processing service for operational uses.
Mechanisation and automation technologies development in work at construction sites
NASA Astrophysics Data System (ADS)
Sobotka, A.; Pacewicz, K.
2017-10-01
Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.
Laser Metal Deposition as Repair Technology for a Gas Turbine Burner Made of Inconel 718
NASA Astrophysics Data System (ADS)
Petrat, Torsten; Graf, Benjamin; Gumenyuk, Andrey; Rethmeier, Michael
Maintenance, repair and overhaul of components are of increasing interest for parts of high complexity and expensive manufacturing costs. In this paper a production process for laser metal deposition is presented, and used to repair a gas turbine burner of Inconel 718. Different parameters for defined track geometries were determined to attain a near net shape deposition with consistent build-up rate for changing wall thicknesses over the manufacturing process. Spot diameter, powder feed rate, welding velocity and laser power were changed as main parameters for a different track size. An optimal overlap rate for a constant layer height was used to calculate the best track size for a fitting layer width similar to the part dimension. Deviations in width and height over the whole build-up process were detected and customized build-up strategies for the 3D sequences were designed. The results show the possibility of a near net shape repair by using different track geometries with laser metal deposition.
Quality assurance of technical specification approval process
NASA Astrophysics Data System (ADS)
Antsev, V. Yu; Antseva, N. V.; Chernecova, E. A.
2018-03-01
The paper reviews the issue of increasing the efficiency of contract analysis on machine-building plants in accordance with process approach principles and on the basis of better interaction between marketing, finance and accounting, and R&D departments.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-22
... Integrated Licensing Process (ILP); (2) build on the feedback gathered through personal interviews, by-sector... Licensing Process September 14, 2010. As announced in the May 18, 2010, ``Notice of Interviews...
Challenges in Laser Sintering of Melt-Processable Thermoset Imide Resin
NASA Technical Reports Server (NTRS)
Chuang, Kathy C.; Gornet, Timothy; Koerner, Hilmar
2016-01-01
Polymer Laser Sintering (LS) is an additive manufacturing technique that builds 3D models layer by layer using a laser to selectively melt cross sections in powdered polymeric materials, following sequential slices of the CAD model. LS generally uses thermoplastic polymeric powders, such as polyamides (i.e. Nylon), and the resultant 3D objects are often weaker in their strength compared to traditionally processed materials, due to the lack of polymer inter-chain connection in the z-direction. The objective of this project is to investigate the possibility of printing a melt-processable RTM370 imide resin powder terminated with reactive phenylethynyl groups by LS, followed by a postcure in order to promote additional crosslinking to achieve higher temperature (250-300 C) capability. A preliminary study to build tensile specimens by LS and the corresponding DSC and rheology study of RTM370 during LS process is presented.
Sasanguie, Delphine; Reynvoet, Bert
2014-01-01
Several studies have shown that performance on symbolic number tasks is related to individual differences in arithmetic. However, it is not clear which process is responsible for this association, i.e. fast, automatic processing of symbols per se or access to the underlying non-symbolic representation of the symbols. To dissociate between both options, adult participants performed an audiovisual matching paradigm. Auditory presented number words needed to be matched with either Arabic digits or dot patterns. The results revealed that a distance effect was present in the dots-number word matching task and absent in the digit-number word matching task. Crucially, only performance in the digit task contributed to the variance in arithmetical abilities. This led us to conclude that adults' arithmetic builds on the ability to quickly and automatically process Arabic digits, without the underlying non-symbolic magnitude representation being activated. PMID:24505308
Modeling of electrohydrodynamic drying process using response surface methodology
Dalvand, Mohammad Jafar; Mohtasebi, Seyed Saeid; Rafiee, Shahin
2014-01-01
Energy consumption index is one of the most important criteria for judging about new, and emerging drying technologies. One of such novel and promising alternative of drying process is called electrohydrodynamic (EHD) drying. In this work, a solar energy was used to maintain required energy of EHD drying process. Moreover, response surface methodology (RSM) was used to build a predictive model in order to investigate the combined effects of independent variables such as applied voltage, field strength, number of discharge electrode (needle), and air velocity on moisture ratio, energy efficiency, and energy consumption as responses of EHD drying process. Three-levels and four-factor Box–Behnken design was employed to evaluate the effects of independent variables on system responses. A stepwise approach was followed to build up a model that can map the entire response surface. The interior relationships between parameters were well defined by RSM. PMID:24936289
Investigating Auditory Processing of Syntactic Gaps with L2 Speakers Using Pupillometry
ERIC Educational Resources Information Center
Fernandez, Leigh; Höhle, Barbara; Brock, Jon; Nickels, Lyndsey
2018-01-01
According to the Shallow Structure Hypothesis (SSH), second language (L2) speakers, unlike native speakers, build shallow syntactic representations during sentence processing. In order to test the SSH, this study investigated the processing of a syntactic movement in both native speakers of English and proficient late L2 speakers of English using…
ERIC Educational Resources Information Center
Stanford, Linda
This course curriculum is intended for use in an advanced information processing course. It builds on the skills developed in the previous information processing course but goes one step further by requiring students to perform in a simulated office environment and improve their decision-making skills. This volume contains two parts of the…
ERIC Educational Resources Information Center
Jacobs, Richard M.
2016-01-01
A 2 × 2 matrix identifying four discrete thought processes was presented. The contributions of the first three processes in developing the knowledge base of public administration were detailed as were their limitations. It was argued that the fourth process--insight and its mental powers--builds upon the strengths and overcomes the limitations…
ERIC Educational Resources Information Center
Jones, Jonathan P.
2014-01-01
This research study documents and analyzes the experience of teachers who participated in a professional development program to integrate process drama into the teaching of English language arts, social studies, and world languages and cultures. The study addresses and builds upon extant literature in process drama, arts integration, drama…
1981-05-01
coating process in Explosives Manufacturing Line 2. The end products of the initial design effort are process flow diagrams, piping and...instrumentation diagrams, motor control schedules, interlock logic diagrams, piping installation drawings, typical instrument Installation details, equipment...structures, equipment, utilities, and process piping extending 1.5 m (5 ft) beyond the building or area were not included in the scope of work. Nitrolysis
USDA-ARS?s Scientific Manuscript database
Corn zein was melt-processed with methylenediphenyl 4,4'-diisocyanate (MDI) using triethylamine (TEA) as catalyst. The objective is to construct a melt-processed, compatible blend of zein with MDI that can be used as a building block for generating bio-based thermoplastics. The impact of cross-linki...
Towards a Dialogic Understanding of Children's Art-Making Process
ERIC Educational Resources Information Center
Kim, Hyunsu
2018-01-01
This article is intended to identify the complex process of children's art making by bringing new methodologies into the analysis of children's pictures. This article analyses the art-making process of a selected drawing by a five-year-old boy. The study builds on previous findings regarding children's verbal discourses during the art-making…
Refurbishment and school buildings management in a smart building environment
NASA Astrophysics Data System (ADS)
Di Giuda, Giuseppe Martino; Villa, Valentina; Tagliabue, Lavinia Chiara; Giana, Paolo Ettore; Rinaldi, Stefano; Ciribini, Angelo Luigi Camillo
2018-05-01
Building Information Modelling is a methodology, which is able to take into account many data, both geometrical and non-geometrical, in order to evaluate at the actual condition of the asset. The project has the scope of evaluating the conditions of different school buildings, in order to develop a way to choose the best-tailored management solution to the owner. A further step is the management and planning of design solutions during the life cycle customized on monitored buildings' conditions. The research work focuses on providing a support decisions concerning the gap between the present building state laws and the current state of the existing buildings. The process will be developed in an expanded BIM environment, using sensors, which will give back the state of the consistency of the actual conditions to enable the buildings to adapt themselves in the best way into their specific constraints and boundaries. The results of the study are (i) a complete workflow to make decision and the possibility to shape the decision process on an objective through a scientific approach, (ii) evaluate the current state of the asset and (iii) manage maintenance in the lifespan. Further development will take in consideration all the aspects related to management of big data environment generated by a smart buildings system.
Technical Problems of Residential Construction
NASA Astrophysics Data System (ADS)
Nowogońska, Beata; Cibis, Jerzy
2017-10-01
Beauty, utility, durability - these are the features of good architecture and should also be the distinguishing qualities of every residential building. But do beauty and utility remain along with the passing of time? Performance characteristics are an indicator of both, the technical as well as aesthetic state of buildings. Aesthetic needs are in disagreement with the merciless aging process. The beauty of a city is formed not only by the original forms of new residential buildings, but also by existing tenement housing; thus preserving their aesthetics becomes a necessity. Time is continuously passing and along with it, aging intensifies. The aging process is a natural phenomenon for every material. The life expectancy of building materials is also limited. Along with the passing of time, the technical state of residential buildings continuously deteriorates. With the passing of time, the aesthetic values and preferences of users of flats change and the usability of the building decreases. The permanence of buildings, including residential buildings, is shaped not only by the forces of nature but also by activities of humans. A long lifespan is ensured by carrying out ongoing, systematic renovation-repair works. It is thanks to them that buildings derived from past centuries are still being used, and their market attractiveness is not decreasing.
Strategies to integrate patient and family education into patient care redesign.
Yingling, L; Trocino, L
1997-05-01
This article discusses five strategies to effectively integrate patient and family education into patient care redesign. The strategies include building the plan, building a shared mission and vision, building involvement, building collaboration through initiatives, and building accountability. Each strategy or "building block" is vital to the resulting structure of patient and family education. Effective results of the strategies are discussed as milestones. The process must be ongoing to ensure continuous improvement in quality patient care outcomes, consumer satisfaction and cost-effectiveness.
EvoBuild: A Quickstart Toolkit for Programming Agent-Based Models of Evolutionary Processes
NASA Astrophysics Data System (ADS)
Wagh, Aditi; Wilensky, Uri
2018-04-01
Extensive research has shown that one of the benefits of programming to learn about scientific phenomena is that it facilitates learning about mechanisms underlying the phenomenon. However, using programming activities in classrooms is associated with costs such as requiring additional time to learn to program or students needing prior experience with programming. This paper presents a class of programming environments that we call quickstart: Environments with a negligible threshold for entry into programming and a modest ceiling. We posit that such environments can provide benefits of programming for learning without incurring associated costs for novice programmers. To make this claim, we present a design-based research study conducted to compare programming models of evolutionary processes with a quickstart toolkit with exploring pre-built models of the same processes. The study was conducted in six seventh grade science classes in two schools. Students in the programming condition used EvoBuild, a quickstart toolkit for programming agent-based models of evolutionary processes, to build their NetLogo models. Students in the exploration condition used pre-built NetLogo models. We demonstrate that although students came from a range of academic backgrounds without prior programming experience, and all students spent the same number of class periods on the activities including the time students took to learn programming in this environment, EvoBuild students showed greater learning about evolutionary mechanisms. We discuss the implications of this work for design research on programming environments in K-12 science education.
Experiments in concept modeling for radiographic image reports.
Bell, D S; Pattison-Gordon, E; Greenes, R A
1994-01-01
OBJECTIVE: Development of methods for building concept models to support structured data entry and image retrieval in chest radiography. DESIGN: An organizing model for chest-radiographic reporting was built by analyzing manually a set of natural-language chest-radiograph reports. During model building, clinician-informaticians judged alternative conceptual structures according to four criteria: content of clinically relevant detail, provision for semantic constraints, provision for canonical forms, and simplicity. The organizing model was applied in representing three sample reports in their entirety. To explore the potential for automatic model discovery, the representation of one sample report was compared with the noun phrases derived from the same report by the CLARIT natural-language processing system. RESULTS: The organizing model for chest-radiographic reporting consists of 62 concept types and 17 relations, arranged in an inheritance network. The broadest types in the model include finding, anatomic locus, procedure, attribute, and status. Diagnoses are modeled as a subtype of finding. Representing three sample reports in their entirety added 79 narrower concept types. Some CLARIT noun phrases suggested valid associations among subtypes of finding, status, and anatomic locus. CONCLUSIONS: A manual modeling process utilizing explicitly stated criteria for making modeling decisions produced an organizing model that showed consistency in early testing. A combination of top-down and bottom-up modeling was required. Natural-language processing may inform model building, but algorithms that would replace manual modeling were not discovered. Further progress in modeling will require methods for objective model evaluation and tools for formalizing the model-building process. PMID:7719807
Nelson, David A; Simenz, Christopher J; OʼConnor, Sarah P; Greer, Yvonne D; Bachrach, Ann L; Shields, Tony; Fuller, Brett A; Horrigan, Katie; Pritchard, Kathleen; Springer, Judy B; Meurer, John R
2015-01-01
Despite increased attention, conventional views of obesity are based upon individual behaviors, and children and parents living with obesity are assumed to be the primary problem solvers. Instead of focusing exclusively on individual reduction behaviors for childhood obesity, greater focus should be placed on better understanding existing community systems and their effects on obesity. The Milwaukee Childhood Obesity Prevention Project is a community-based coalition established to develop policy and environmental change strategies to impact childhood obesity in Milwaukee, Wisconsin. The coalition conducted a Group Model Building exercise to better understand root causes of childhood obesity in its community. Group Model Building is a process by which a group systematically engages in model construction to better understand the systems that are in place. It helps participants make their mental models explicit through a careful and consistent process to test assumptions. This process has 3 main components: (1) assembling a team of participants; (2) conducting a behavior-over-time graphs exercise; and (3) drawing the causal loop diagram exercise. The behavior-over-time graph portion produced 61 graphs in 10 categories. The causal loop diagram yielded 5 major themes and 7 subthemes. Factors that influence childhood obesity are varied, and it is important to recognize that no single solution exists. The perspectives from this exercise provided a means to create a process for dialogue and commitment by stakeholders and partnerships to build capacity for change within the community.
Assessment Processes and Outcomes: Building a Folio.
ERIC Educational Resources Information Center
Barnett, Bruce G.; Lee, Patty
1994-01-01
The first step in portfolio construction is building a folio--accumulation of all possible materials documenting a person's learning. Materials may include artifacts created by the learner and attestations from other people and organizations. (SK)
VIEW OF THE PRODUCTION FLOOR OF BUILDING 460. BUILDING 460 ...
VIEW OF THE PRODUCTION FLOOR OF BUILDING 460. BUILDING 460 WAS CONSTRUCTED FOR THE MANUFACTURE OF STAINLESS STEEL COMPONENTS SUCH AS RESERVOIRS, TUBES, AND NON-FISSILE TRIGGER COMPONENTS. MANUFACTURING, TESTING, AND INSPECTION PROCESSES OCCUPIED MOST OF THE GROUND FLOOR. (2/20/96) - Rocky Flats Plant, Stainless Steel & Non-Nuclear Components Manufacturing, Southeast corner of intersection of Cottonwood & Third Avenues, Golden, Jefferson County, CO
ERIC Educational Resources Information Center
California State Legislature, Sacramento. Joint Legislative Audit Committee.
The California legislature's Joint Legislative Audit Committee has issued a report on the design-build versus the design-bid-build process and offers a hybrid approach combining the two systems as a way of achieving the greatest cost efficiency at the least risk on public agencies. The cost benefits of faster delivery of the design-build method…
Translating visions into realities.
Nesje, Arne
2006-08-01
The overall vision and the building concept. The overall vision with individual buildings that have focal points for the related medical treatment may seem to increase both investment and operational cost, especially in the period until the total hospital is finished (2014). The slogan "Better services at lower cost" is probably a vision that will prove to be hard to fulfil. But the patients will probably be the long-term winners with single rooms with bathroom, high standards of service, good architecture and a pleasant environment. The challenge will be to get the necessary funding for running the hospital. The planning process and project management Many interviewees indicate how difficult it is to combine many functions and requirements in one building concept. Different architectural, technical, functional and economic interests will often cause conflict. The project organisation HBMN was organised outside the administration of both STOLAV and HMN. A closer connection and better co-operation with STOLAV may have resulted in more influence from the medical employees. It is probably fair to anticipate that the medical employees would have felt more ownership of the process and thus be more satisfied with the concept and the result. On the other hand the organisation of the project outside the hospital administration may have contributed to better control and more professional management of the construction project. The management for planning and building (technical programme, environmental programme, aesthetical The need for control on site was probably underestimated. For STOLAV technical department (TD) the building process has been time-consuming by giving support, making controls and preparing the take-over phase. But during this process they have become better trained to run and operate the new centres. The commissioning phase has been a challenging time. There were generally more changes, supplementation and claims than anticipated. The investment costs are nearly on budget, but the concept will have a negative effect on the running costs of the hospital. The budgets for running both the old and new hospital until phase 2 is finished have not been calculated properly and can reduce the level of ambition in the further process. The moving in phase was a little postponed for some of the centres. Only the laboratory centre has moved in on time. It was realised immediately that the buildings services had not been tested out and adjusted properly. In addition it was acknowledged that there should have been a better training programme for the new organisation before moving in. This situation was extremely challenging for the medical employees. With experience from building phase 1, HBMN decided to change the contract model for building phase 2 to a partnering process. That means higher involvement of suppliers and subcontractors with a goal to improve both quality and efficiency. A greater involvement of all participants is needed to share the risk but also reduce costs.
Building Capacity for Actionable Science and Decision Making in Alaska
NASA Astrophysics Data System (ADS)
Timm, K.; Kettle, N.; Buxbaum, T. M.; Trainor, S.; Walsh, J. E.; York, A.
2017-12-01
Investigations of the processes for developing actionable science and supporting partnerships between researchers and practitioners has received increasing attention over the past decade. These studies highlight the importance of leveraging existing relationships and trust, supporting iterative interactions, and dedicating sufficient financial and human capital to the development of usable climate science. However, significant gaps remain in our understanding of how to build capacity for more effective partnerships. To meet these ends, the Alaska Center for Climate Assessment and Policy (ACCAP) is developing a series of trainings for scientists and practitioners to build capacity for producing actionable science. This process includes three phases: scoping and development, training, and evaluation. This presentation reports on the scoping and development phase of the project, which draws on an extensive web-based search of past and present capacity building and training activities, document analysis, and surveys of trainers. A synthesis of successful formats (e.g., training, placements, etc.), curriculum topics (e.g., climate science, interpersonal communication), and approaches to recruitment and curriculum development will be outlined. We then outline our approach for co-developing trainings in three different sectors, which engages other boundary organizations to leverage trust and exiting network connections to tailor the training activities. Through this effort we ultimately seek to understand how the processes and outcomes for co-developing trainings in actionable science vary across sectors and their implications for building capacity.
Building capacity for the continuous improvement of health-promoting schools.
Hoyle, Tena B; Samek, Beverly B; Valois, Robert F
2008-01-01
There has been much educational verbosity over the past decade related to building capacity for effective schools. However, there seems to be a scarcity of clarification about what is meant by school capacity building or how to accomplish and sustain this process. This article describes the preexisting conditions and ongoing processes in Pueblo, Colorado School District 60 (Pueblo 60) that built capacity for the development and continuous improvement of health-promoting schools. Capacity building strategies and a program-planning model for continuous improvement for health-promoting schools were used that included: (a) visionary/effective leadership and management structures, (b) extensive internal and external supports, (c) development and allocation of adequate resources, (d) supportive policies and procedures, and (e) ongoing, embedded professional development. Pueblo 60 strategically developed an infrastructure through which they successfully delivered a wide array of health programs and services. Through building organizational capacity at the school district and school level, additional school health programming can be developed and sustained.
Unofficial Road Building in the Amazon: Socioeconomic and Biophysical Explanations
NASA Technical Reports Server (NTRS)
Perz, Stephen G.; Caldas, Marcellus M.; Arima, Eugenio; Walker, Robert J.
2007-01-01
Roads have manifold social and environmental impacts, including regional development, social conflicts and habitat fragmentation. 'Road ecology' has emerged as an approach to evaluate the various ecological and hydrological impacts of roads. This article aims to complement road ecology by examining the socio-spatial processes of road building itself. Focusing on the Brazilian Amazon, a heavily-studied context due to forest fragmentation by roads, the authors consider non-state social actors who build 'unofficial roads' for the purpose of gaining access to natural resources to support livelihoods and community development. They examine four case studies of roads with distinct histories in order to explain the socio-spatial processes behind road building in terms of profit maximization, land tenure claims, co-operative and conflictive political ecologies, and constraints as well as opportunities afforded by the biophysical environment. The study cases illustrate the need for a multi-pronged theoretical approach to understanding road building, and call for more attention to the role of non-state actors in unofficial road construction.
Dynamic Resource Allocation to Improve Service Performance in Order Fulfillment Systems
2009-01-01
efficient system uses economies of scale at two points: orders are batched before processing, which reduces processing costs, and processed or- ders ...the ef- fects of batching on order picking processes is well-researched and well-understood ( van den Berg and Gademann, 1999). Because orders are...a final so- journ time distribution. Our work builds on existing research in matrix-geometric methods by Neuts (1981), Asmussen and M0ller (2001
A Platform Architecture for Sensor Data Processing and Verification in Buildings
ERIC Educational Resources Information Center
Ortiz, Jorge Jose
2013-01-01
This thesis examines the state of the art of building information systems and evaluates their architecture in the context of emerging technologies and applications for deep analysis of the built environment. We observe that modern building information systems are difficult to extend, do not provide general services for application development, do…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-08
..., occupational skills training, and employment services to disadvantaged youth in their communities while... Solicitation for Grant Applications for YouthBuild Grants AGENCY: Employment and Training Administration, Labor... Workforce Investment Act [29 U.S.C. 2918a]. YouthBuild grants will be awarded through a competitive process...
High-School Buildings and Grounds. Bulletin, 1922, No. 23
ERIC Educational Resources Information Center
Bureau of Education, Department of the Interior, 1922
1922-01-01
The success of any high school depends largely upon the planning of its building. The wise planning of a high-school building requires familiarity with school needs and processes, knowledge of the best approved methods of safety, lighting, sanitation, and ventilation, and ability to solve the educational, structural, and architectural problems…
Code of Federal Regulations, 2010 CFR
2010-10-01
... into a contract for the design and construction of a public building, facility, or work, if the... acquisition approach of design-bid-build established under the Brooks Architect-Engineers Act (40 U.S.C. 1101... parts of this chapter and, for DoD, the design-build process described in 10 U.S.C. 2862. [62 FR 272...
13 CFR 120.172 - Flood-plain and wetlands management.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 8-step decision making process with respect to: (1) Construction or acquisition of anything, other than a building; (2) Repair and restoration equal to more than 50% of the market value of a building... base floodplain; (2) Repairs, other than to buildings, that are less than 50% of the market value; (3...
13 CFR 120.172 - Flood-plain and wetlands management.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 8-step decision making process with respect to: (1) Construction or acquisition of anything, other than a building; (2) Repair and restoration equal to more than 50% of the market value of a building... base floodplain; (2) Repairs, other than to buildings, that are less than 50% of the market value; (3...
13 CFR 120.172 - Flood-plain and wetlands management.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 8-step decision making process with respect to: (1) Construction or acquisition of anything, other than a building; (2) Repair and restoration equal to more than 50% of the market value of a building... base floodplain; (2) Repairs, other than to buildings, that are less than 50% of the market value; (3...
13 CFR 120.172 - Flood-plain and wetlands management.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 8-step decision making process with respect to: (1) Construction or acquisition of anything, other than a building; (2) Repair and restoration equal to more than 50% of the market value of a building... base floodplain; (2) Repairs, other than to buildings, that are less than 50% of the market value; (3...
Interpretive Research Aiming at Theory Building: Adopting and Adapting the Case Study Design
ERIC Educational Resources Information Center
Diaz Andrade, Antonio
2009-01-01
Although the advantages of case study design are widely recognised, its original positivist underlying assumptions may mislead interpretive researchers aiming at theory building. The paper discusses the limitations of the case study design for theory building and explains how grounded theory systemic process adds to the case study design. The…
Digital Learning Material for Model Building in Molecular Biology
ERIC Educational Resources Information Center
Aegerter-Wilmsen, Tinri; Janssen, Fred; Hartog, Rob; Bisseling, Ton
2005-01-01
Building models to describe processes forms an essential part of molecular biology research. However, in molecular biology curricula little attention is generally being paid to the development of this skill. In order to provide students the opportunity to improve their model building skills, we decided to develop a number of digital cases about…
Building an Inclusive Research Team: The Importance of Team Building and Skills Training
ERIC Educational Resources Information Center
Strnadová, Iva; Cumming, Therese M.; Knox, Marie; Parmenter, Trevor
2014-01-01
Background: Inclusive research teams typically describe their experiences and analyse the type of involvement of researchers with disability, but the process of building research teams and the need for research training still remain underexplored in the literature. Materials and Method: Four researchers with intellectual disabilities and four…
Knotworking and the Visibilization of Learning in Building Design
ERIC Educational Resources Information Center
Kerosuo, Hannele; Mäki, Tarja; Korpela, Jenni
2015-01-01
Purpose: This paper aims to study the visibilization of learning in the context of developing a new collaborative practice, knotworking, in building design. The case under study describes the process of learning from the initiation of knotworking to its experimentation. The implementation of new building information modeling tools acted as an…
Building Regional Capacity: Lessons from Leadership South West
ERIC Educational Resources Information Center
Bolden, Richard; Bagnall, Jackie
2009-01-01
Purpose: The purpose of this paper is to present experiences and insights from an higher education-led initiative to build leadership capacity within the South West of England in order to the shed light onto the processes and mechanisms of regional capacity building. Design/methodology/approach: The approach was one of participative action…
Building Capacity for the Continuous Improvement of Health-Promoting Schools
ERIC Educational Resources Information Center
Hoyle, Tena B.; Samek, Beverly B.; Valois, Robert F.
2008-01-01
Background: There has been much educational verbosity over the past decade related to building capacity for effective schools. However, there seems to be a scarcity of clarification about what is meant by school capacity building or how to accomplish and sustain this process. This article describes the preexisting conditions and ongoing processes…
BIM Based Virtual Environment for Fire Emergency Evacuation
Rezgui, Yacine; Ong, Hoang N.
2014-01-01
Recent building emergency management research has highlighted the need for the effective utilization of dynamically changing building information. BIM (building information modelling) can play a significant role in this process due to its comprehensive and standardized data format and integrated process. This paper introduces a BIM based virtual environment supported by virtual reality (VR) and a serious game engine to address several key issues for building emergency management, for example, timely two-way information updating and better emergency awareness training. The focus of this paper lies on how to utilize BIM as a comprehensive building information provider to work with virtual reality technologies to build an adaptable immersive serious game environment to provide real-time fire evacuation guidance. The innovation lies on the seamless integration between BIM and a serious game based virtual reality (VR) environment aiming at practical problem solving by leveraging state-of-the-art computing technologies. The system has been tested for its robustness and functionality against the development requirements, and the results showed promising potential to support more effective emergency management. PMID:25197704
Sutton, Steven C; Hu, Mingxiu
2006-05-05
Many mathematical models have been proposed for establishing an in vitro/in vivo correlation (IVIVC). The traditional IVIVC model building process consists of 5 steps: deconvolution, model fitting, convolution, prediction error evaluation, and cross-validation. This is a time-consuming process and typically a few models at most are tested for any given data set. The objectives of this work were to (1) propose a statistical tool to screen models for further development of an IVIVC, (2) evaluate the performance of each model under different circumstances, and (3) investigate the effectiveness of common statistical model selection criteria for choosing IVIVC models. A computer program was developed to explore which model(s) would be most likely to work well with a random variation from the original formulation. The process used Monte Carlo simulation techniques to build IVIVC models. Data-based model selection criteria (Akaike Information Criteria [AIC], R2) and the probability of passing the Food and Drug Administration "prediction error" requirement was calculated. To illustrate this approach, several real data sets representing a broad range of release profiles are used to illustrate the process and to demonstrate the advantages of this automated process over the traditional approach. The Hixson-Crowell and Weibull models were often preferred over the linear. When evaluating whether a Level A IVIVC model was possible, the model selection criteria AIC generally selected the best model. We believe that the approach we proposed may be a rapid tool to determine which IVIVC model (if any) is the most applicable.
Wynn, Jonathan K.; Lee, Junghee; Horan, William P.; Green, Michael F.
2008-01-01
Schizophrenia patients show impairments in identifying facial affect; however, it is not known at what stage facial affect processing is impaired. We evaluated 3 event-related potentials (ERPs) to explore stages of facial affect processing in schizophrenia patients. Twenty-six schizophrenia patients and 27 normal controls participated. In separate blocks, subjects identified the gender of a face, the emotion of a face, or if a building had 1 or 2 stories. Three ERPs were examined: (1) P100 to examine basic visual processing, (2) N170 to examine facial feature encoding, and (3) N250 to examine affect decoding. Behavioral performance on each task was also measured. Results showed that schizophrenia patients’ P100 was comparable to the controls during all 3 identification tasks. Both patients and controls exhibited a comparable N170 that was largest during processing of faces and smallest during processing of buildings. For both groups, the N250 was largest during the emotion identification task and smallest for the building identification task. However, the patients produced a smaller N250 compared with the controls across the 3 tasks. The groups did not differ in behavioral performance in any of the 3 identification tasks. The pattern of intact P100 and N170 suggest that patients maintain basic visual processing and facial feature encoding abilities. The abnormal N250 suggests that schizophrenia patients are less efficient at decoding facial affect features. Our results imply that abnormalities in the later stage of feature decoding could potentially underlie emotion identification deficits in schizophrenia. PMID:18499704
2014-09-25
CAPE CANAVERAL, Fla. – Operations are underway to couple Florida East Coast Railway, or FEC, locomotives No. 433 and No. 428 on the track alongside the Indian River, north of Launch Complex 39 at NASA’s Kennedy Space Center in Florida. Kennedy's Center Planning and Development Directorate has enlisted the locomotives to support a Rail Vibration Test for the Canaveral Port Authority. The purpose of the test is to collect amplitude, frequency and vibration test data utilizing two Florida East Coast locomotives operating on KSC tracks to ensure that future railroad operations will not affect launch vehicle processing at the center. Buildings instrumented for the test include the Rotation Processing Surge Facility, Thermal Protection Systems Facility, Vehicle Assembly Building, Orbiter Processing Facility and Booster Fabrication Facility. Photo credit: NASA/Daniel Casper
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Building science research supports installing exterior (soil side) foundation insulation as the optimal method to enhance the hygrothermal performance of new homes. With exterior foundation insulation, water management strategies are maximized while insulating the basement space and ensuring a more even temperature at the foundation wall. This project describes an innovative, minimally invasive foundation insulation upgrade technique on an existing home that uses hydrovac excavation technology combined with a liquid insulating foam. Cost savings over the traditional excavation process ranged from 23% to 50%. The excavationless process could result in even greater savings since replacement of building structures, exterior features,more » utility meters, and landscaping would be minimal or non-existent in an excavationless process.« less
Bolam, Bruce; McLean, Carl; Pennington, Andrew; Gillies, Pamela
2006-03-01
The present article presents an exploratory qualitative process evaluation study of 'Ambassador' participation in CityNet, an innovative information-communication technology-based (ICT) project that aims to build aspects of social capital and improve access to information and services among disadvantaged groups in Nottingham, UK. A purposive sample of 40 'Ambassadors' interviewees was gathered in three waves of data collection. The two emergent analytic themes highlighted how improvements in confidence, self-esteem and social networks produced via participation were mitigated by structural problems in devolving power within the project. This illustrates how concepts of power are important for understanding the process of health promotion interventions using new media.
Building Diagnostic Market Deployment - Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Katipamula, S.; Gayeski, N.
2012-04-30
Operational faults are pervasive across the commercial buildings sector, wasting energy and increasing energy costs by up to about 30% (Mills 2009, Liu et al. 2003, Claridge et al. 2000, Katipamula and Brambley 2008, and Brambley and Katipamula 2009). Automated fault detection and diagnostic (AFDD) tools provide capabilities essential for detecting and correcting these problems and eliminating the associated energy waste and costs. The U.S. Department of Energy's (DOE) Building Technology Program (BTP) has previously invested in developing and testing of such diagnostic tools for whole-building (and major system) energy use, air handlers, chillers, cooling towers, chilled-water distribution systems, andmore » boilers. These diagnostic processes can be used to make the commercial buildings more energy efficient. The work described in this report was done as part of a Cooperative Research and Development Agreement (CRADA) between the U.S. Department of Energy's Pacific Northwest National Laboratory (PNNL) and KGS Building LLC (KGS). PNNL and KGS both believe that the widespread adoption of AFDD tools will result in significant reduction to energy and peak energy consumption. The report provides an introduction and summary of the various tasks performed under the CRADA. The CRADA project had three major focus areas: (1) Technical Assistance for Whole Building Energy Diagnostician (WBE) Commercialization, (2) Market Transfer of the Outdoor Air/Economizer Diagnostician (OAE), and (3) Development and Deployment of Automated Diagnostics to Improve Large Commercial Building Operations. PNNL has previously developed two diagnostic tools: (1) whole building energy (WBE) diagnostician and (2) outdoor air/economizer (OAE) diagnostician. WBE diagnostician is currently licensed non-exclusively to one company. As part of this CRADA, PNNL developed implementation documentation and provided technical support to KGS to implement the tool into their software suite, Clockworks. PNNL also provided validation data sets and the WBE software tool to validate the KGS implementation. OAE diagnostician automatically detects and diagnoses problems with outdoor air ventilation and economizer operation for air handling units (AHUs) in commercial buildings using data available from building automation systems (BASs). As part of this CRADA, PNNL developed implementation documentation and provided technical support to KGS to implement the tool into their software suite. PNNL also provided validation data sets and the OAE software tool to validate the KGS implementation. Finally, as part of this CRADA project, PNNL developed new processes to automate parts of the re-tuning process and transfer those process to KGS for integration into their software product. The transfer of DOE-funded technologies will transform the commercial buildings sector by making buildings more energy efficient and also reducing the carbon footprint from the buildings. As part of the CRADA with PNNL, KGS implemented the whole building energy diagnostician, a portion of outdoor air economizer diagnostician and a number of measures that automate the identification of re-tuning measures.« less
NASA Astrophysics Data System (ADS)
Sturm, Michael; Gems, Bernhard; Fuchs, Sven; Mazzorana, Bruno; Papathoma-Köhle, Maria; Aufleger, Markus
2016-04-01
In European mountain regions, losses due to torrential hazards are still considerable high despite the ongoing debate on an overall increasing or decreasing trend. Recent events in Austria severely revealed that due to technical and economic reasons, an overall protection of settlements in the alpine environment against torrential hazards is not feasible. On the side of the hazard process, events with unpredictable intensities may represent overload scenarios for existent protection structures in the torrent catchments. They bear a particular risk of significant losses in the living space. Although the importance of vulnerability is widely recognised, there is still a research gap concerning its assessment. Currently, potential losses at buildings due to torrential hazards and their comparison with reinstatement costs are determined by the use of empirical functions. Hence, relations of process intensities and the extent of losses, gathered by the analysis of historic hazard events and the information of object-specific restoration values, are used. This approach does not represent a physics-based and integral concept since relevant and often crucial processes, as the intrusion of the fluid-sediment-mixture into elements at risk, are not considered. Based on these findings, our work is targeted at extending these findings and models of present risk research in the context of an integral, more physics-based vulnerability analysis concept. Fluviatile torrential hazard processes and their impacts on the building envelope are experimentally modelled. Material intrusion processes are thereby explicitly considered. Dynamic impacts are gathered quantitatively and spatially distributed by the use of a large set of force transducers. The experimental tests are accomplished with artificial, vertical and skewed plates, including also openings for material intrusion. Further, the impacts on specific buildings within the test site of the work, the fan apex of the Schnannerbach torrent in Tyrol (Austria), are analysed in detail. A couple of buildings are entirely reconstructed within the physical scale model at the scale 1:30. They include basement and first floor and thereby all relevant openings on the building envelopes. The results from experimental modelling represent the data basis for further physics-based vulnerability analysis. Hence, the applied vulnerability analysis concept significantly extends the methods presently used in flood risk assessment. The results of the study are of basic importance for practical application, as they provide extensive information to support hazard zone mapping and management, as well as the planning of local technical protection measures.
The Architectural and Interior Design Planning Process.
ERIC Educational Resources Information Center
Cohen, Elaine
1994-01-01
Explains the planning process in designing effective library facilities and discusses library building requirements that result from electronic information technologies. Highlights include historical structures; Americans with Disabilities Act; resource allocation; electrical power; interior spaces; lighting; design development; the roles of…
Mechanistic design data from ODOT instrumented pavement sites : phase II report.
DOT National Transportation Integrated Search
2017-03-01
This investigation examined data obtained from three previously-instrumented pavement test sites in Oregon. Data processing algorithms and templates were developed for each test site that facilitated full processing of all the data to build databases...
Mechanistic design data from ODOT instrumented pavement sites : phase 1 report.
DOT National Transportation Integrated Search
2017-03-01
This investigation examined data obtained from three previously-instrumented pavement test sites in Oregon. Data processing algorithms and templates were developed for each test site that facilitated full processing of all the data to build databases...
Variable dynamic testbed vehicle : safety plan
DOT National Transportation Integrated Search
1997-02-01
This safety document covers the entire safety process from inception to delivery of the Variable Dynamic Testbed Vehicle. In addition to addressing the process of safety on the vehicle , it should provide a basis on which to build future safety proce...
A software architecture for automating operations processes
NASA Technical Reports Server (NTRS)
Miller, Kevin J.
1994-01-01
The Operations Engineering Lab (OEL) at JPL has developed a software architecture based on an integrated toolkit approach for simplifying and automating mission operations tasks. The toolkit approach is based on building adaptable, reusable graphical tools that are integrated through a combination of libraries, scripts, and system-level user interface shells. The graphical interface shells are designed to integrate and visually guide a user through the complex steps in an operations process. They provide a user with an integrated system-level picture of an overall process, defining the required inputs and possible output through interactive on-screen graphics. The OEL has developed the software for building these process-oriented graphical user interface (GUI) shells. The OEL Shell development system (OEL Shell) is an extension of JPL's Widget Creation Library (WCL). The OEL Shell system can be used to easily build user interfaces for running complex processes, applications with extensive command-line interfaces, and tool-integration tasks. The interface shells display a logical process flow using arrows and box graphics. They also allow a user to select which output products are desired and which input sources are needed, eliminating the need to know which program and its associated command-line parameters must be executed in each case. The shells have also proved valuable for use as operations training tools because of the OEL Shell hypertext help environment. The OEL toolkit approach is guided by several principles, including the use of ASCII text file interfaces with a multimission format, Perl scripts for mission-specific adaptation code, and programs that include a simple command-line interface for batch mode processing. Projects can adapt the interface shells by simple changes to the resources configuration file. This approach has allowed the development of sophisticated, automated software systems that are easy, cheap, and fast to build. This paper will discuss our toolkit approach and the OEL Shell interface builder in the context of a real operations process example. The paper will discuss the design and implementation of a Ulysses toolkit for generating the mission sequence of events. The Sequence of Events Generation (SEG) system provides an adaptable multimission toolkit for producing a time-ordered listing and timeline display of spacecraft commands, state changes, and required ground activities.
U.S. Team Green Building Challenge 2002
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2002-09-01
Flier about the U.S. Team and its projects participating in the International Green Building Challenge. Along with many other countries, the United States accepted the Green Building Challenge (GBC), an international effort to evaluate and improve the performance of buildings worldwide. GBC started out in 1996 as a competition to determine which country had the greenest buildings; it evolved into a cooperative process among the countries to measure the performance of green buildings. Although the auto industry can easily measure efficiency in terms of miles per gallon, the buildings industry has no standard way to quantify energy and environmental performance.more » The Green Building Challenge participants hope that better tools for measuring the energy and environmental performance of buildings will be an outcome of their efforts and that these tools will lead to higher and better performance levels in buildings around the world. The ultimate goal is to design, construct, and operate buildings that contribute to global sustainability by conserving and/or regenerating natural resources and minimizing nonrenewable energy use. The United States' Green Building Challenge Team '02 selected five buildings from around the country to serve as case studies; each of the five U.S. building designs (as well as all international case studies) were assessed using an in-depth evaluation tool, called the Green Building Assessment Tool (GBTool). The GBTool was specifically created and refined by international teams, for the GBC efforts. The goal of this collaborative effort is to improve this evaluation software tool so that it can be used globally, while taking into account regional and national conditions. The GBTool was used by the U.S. Team to assess and evaluate the energy and environmental performance of these five buildings: (1) Retail (in operation): BigHorn Home Improvement Center, Silverthorne, Colorado; (2) Office (in operation), Philip Merrill Environmental; (3) School (in construction), Clearview Elementary School, Hanover, Pennsylvania; (4) Multi-family residential (in construction), Twenty River Terrace, Battery Park City, New York; and (5) Office/lab (in design), National Oceanic Atmospheric Administration, Honolulu, Hawaii. These projects were selected, not only because they were good examples of high-performance buildings and had interested owners/design team members, but also because building data was available as inputs to test the software tool. Both the tool and the process have been repeatedly refined and enhanced since the first Green Building Challenge event in 1998; participating countries are continuously providing feedback to further improve the tool and global process for the greatest positive effect.« less
Development of an automated energy audit protocol for office buildings
NASA Astrophysics Data System (ADS)
Deb, Chirag
This study aims to enhance the building energy audit process, and bring about reduction in time and cost requirements in the conduction of a full physical audit. For this, a total of 5 Energy Service Companies in Singapore have collaborated and provided energy audit reports for 62 office buildings. Several statistical techniques are adopted to analyse these reports. These techniques comprise cluster analysis and development of prediction models to predict energy savings for buildings. The cluster analysis shows that there are 3 clusters of buildings experiencing different levels of energy savings. To understand the effect of building variables on the change in EUI, a robust iterative process for selecting the appropriate variables is developed. The results show that the 4 variables of GFA, non-air-conditioning energy consumption, average chiller plant efficiency and installed capacity of chillers should be taken for clustering. This analysis is extended to the development of prediction models using linear regression and artificial neural networks (ANN). An exhaustive variable selection algorithm is developed to select the input variables for the two energy saving prediction models. The results show that the ANN prediction model can predict the energy saving potential of a given building with an accuracy of +/-14.8%.
Modelling of Rail Vehicles and Track for Calculation of Ground-Vibration Transmission Into Buildings
NASA Astrophysics Data System (ADS)
Hunt, H. E. M.
1996-05-01
A methodology for the calculation of vibration transmission from railways into buildings is presented. The method permits existing models of railway vehicles and track to be incorporated and it has application to any model of vibration transmission through the ground. Special attention is paid to the relative phasing between adjacent axle-force inputs to the rail, so that vibration transmission may be calculated as a random process. The vehicle-track model is used in conjunction with a building model of infinite length. The tracking and building are infinite and parallel to each other and forces applied are statistically stationary in space so that vibration levels at any two points along the building are the same. The methodology is two-dimensional for the purpose of application of random process theory, but fully three-dimensional for calculation of vibration transmission from the track and through the ground into the foundations of the building. The computational efficiency of the method will interest engineers faced with the task of reducing vibration levels in buildings. It is possible to assess the relative merits of using rail pads, under-sleeper pads, ballast mats, floating-slab track or base isolation for particular applications.
Crowd-sourced data collection to support automatic classification of building footprint data
NASA Astrophysics Data System (ADS)
Hecht, Robert; Kalla, Matthias; Krüger, Tobias
2018-05-01
Human settlements are mainly formed by buildings with their different characteristics and usage. Despite the importance of buildings for the economy and society, complete regional or even national figures of the entire building stock and its spatial distribution are still hardly available. Available digital topographic data sets created by National Mapping Agencies or mapped voluntarily through a crowd via Volunteered Geographic Information (VGI) platforms (e.g. OpenStreetMap) contain building footprint information but often lack additional information on building type, usage, age or number of floors. For this reason, predictive modeling is becoming increasingly important in this context. The capabilities of machine learning allow for the prediction of building types and other building characteristics and thus, the efficient classification and description of the entire building stock of cities and regions. However, such data-driven approaches always require a sufficient amount of ground truth (reference) information for training and validation. The collection of reference data is usually cost-intensive and time-consuming. Experiences from other disciplines have shown that crowdsourcing offers the possibility to support the process of obtaining ground truth data. Therefore, this paper presents the results of an experimental study aiming at assessing the accuracy of non-expert annotations on street view images collected from an internet crowd. The findings provide the basis for a future integration of a crowdsourcing component into the process of land use mapping, particularly the automatic building classification.
EAST ELEVATION OF HIGH BAY ADDITION OF FUEL STORAGE BUILDING ...
EAST ELEVATION OF HIGH BAY ADDITION OF FUEL STORAGE BUILDING (CPP-603). INL DRAWING NUMBER 200-0603-00-706-051286. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Bai, Xiao-ping; Zhang, Xi-wei
2013-01-01
Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.
Plug and Process Loads Capacity and Power Requirements Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sheppy, M.; Gentile-Polese, L.
2014-09-01
This report addresses gaps in actionable knowledge that would help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. Limited initial data, however, suggest that actual PPL densities in leased buildings are substantially lower. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems. Better guidance will enable improved sizing and design of these systems, decrease upfront capital costs, and allow systems to operate more energy efficiently. The main focus ofmore » this report is to provide industry with reliable, objective third-party guidance to address the information gap in typical PPL densities for commercial building tenants. This could drive changes in negotiations about PPL energy demands.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2004-06-01
This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section onmore » establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.« less
NASA Astrophysics Data System (ADS)
Childs-Gleason, L. M.; Ross, K. W.; Crepps, G.; Miller, T. N.; Favors, J. E.; Rogers, L.; Allsbrook, K. N.; Bender, M. R.; Ruiz, M. L.
2015-12-01
NASA's DEVELOP National Program fosters an immersive research environment for dual capacity building. Through rapid feasibility Earth science projects, the future workforce and current decision makers are engaged in research projects to build skills and capabilities to use Earth observation in environmental management and policy making. DEVELOP conducts over 80 projects annually, successfully building skills through partnerships with over 150 organizations and providing over 350 opportunities for project participants each year. Filling a void between short-term training courses and long-term research projects, the DEVELOP model has been successful in supporting state, local, federal and international government organizations to adopt methodologies and enhance decision making processes. This presentation will highlight programmatic best practices, feedback from participants and partner organizations, and three sample case studies of successful adoption of methods in the decision making process.
A midas plugin to enable construction of reproducible web-based image processing pipelines
Grauer, Michael; Reynolds, Patrick; Hoogstoel, Marion; Budin, Francois; Styner, Martin A.; Oguz, Ipek
2013-01-01
Image processing is an important quantitative technique for neuroscience researchers, but difficult for those who lack experience in the field. In this paper we present a web-based platform that allows an expert to create a brain image processing pipeline, enabling execution of that pipeline even by those biomedical researchers with limited image processing knowledge. These tools are implemented as a plugin for Midas, an open-source toolkit for creating web based scientific data storage and processing platforms. Using this plugin, an image processing expert can construct a pipeline, create a web-based User Interface, manage jobs, and visualize intermediate results. Pipelines are executed on a grid computing platform using BatchMake and HTCondor. This represents a new capability for biomedical researchers and offers an innovative platform for scientific collaboration. Current tools work well, but can be inaccessible for those lacking image processing expertise. Using this plugin, researchers in collaboration with image processing experts can create workflows with reasonable default settings and streamlined user interfaces, and data can be processed easily from a lab environment without the need for a powerful desktop computer. This platform allows simplified troubleshooting, centralized maintenance, and easy data sharing with collaborators. These capabilities enable reproducible science by sharing datasets and processing pipelines between collaborators. In this paper, we present a description of this innovative Midas plugin, along with results obtained from building and executing several ITK based image processing workflows for diffusion weighted MRI (DW MRI) of rodent brain images, as well as recommendations for building automated image processing pipelines. Although the particular image processing pipelines developed were focused on rodent brain MRI, the presented plugin can be used to support any executable or script-based pipeline. PMID:24416016
A midas plugin to enable construction of reproducible web-based image processing pipelines.
Grauer, Michael; Reynolds, Patrick; Hoogstoel, Marion; Budin, Francois; Styner, Martin A; Oguz, Ipek
2013-01-01
Image processing is an important quantitative technique for neuroscience researchers, but difficult for those who lack experience in the field. In this paper we present a web-based platform that allows an expert to create a brain image processing pipeline, enabling execution of that pipeline even by those biomedical researchers with limited image processing knowledge. These tools are implemented as a plugin for Midas, an open-source toolkit for creating web based scientific data storage and processing platforms. Using this plugin, an image processing expert can construct a pipeline, create a web-based User Interface, manage jobs, and visualize intermediate results. Pipelines are executed on a grid computing platform using BatchMake and HTCondor. This represents a new capability for biomedical researchers and offers an innovative platform for scientific collaboration. Current tools work well, but can be inaccessible for those lacking image processing expertise. Using this plugin, researchers in collaboration with image processing experts can create workflows with reasonable default settings and streamlined user interfaces, and data can be processed easily from a lab environment without the need for a powerful desktop computer. This platform allows simplified troubleshooting, centralized maintenance, and easy data sharing with collaborators. These capabilities enable reproducible science by sharing datasets and processing pipelines between collaborators. In this paper, we present a description of this innovative Midas plugin, along with results obtained from building and executing several ITK based image processing workflows for diffusion weighted MRI (DW MRI) of rodent brain images, as well as recommendations for building automated image processing pipelines. Although the particular image processing pipelines developed were focused on rodent brain MRI, the presented plugin can be used to support any executable or script-based pipeline.
Lee, Robert H; Bott, Marjorie J; Forbes, Sarah; Redford, Linda; Swagerty, Daniel L; Taunton, Roma Lee
2003-01-01
Understanding how quality improvement affects costs is important. Unfortunately, low-cost, reliable ways of measuring direct costs are scarce. This article builds on the principles of process improvement to develop a costing strategy that meets both criteria. Process-based costing has 4 steps: developing a flowchart, estimating resource use, valuing resources, and calculating direct costs. To illustrate the technique, this article uses it to cost the care planning process in 3 long-term care facilities. We conclude that process-based costing is easy to implement; generates reliable, valid data; and allows nursing managers to assess the costs of new or modified processes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fisher, Karl A.; Candy, Jim V.; Guss, Gabe
2016-10-14
In situ real-time monitoring of the Selective Laser Melting (SLM) process has significant implications for the AM community. The ability to adjust the SLM process parameters during a build (in real-time) can save time, money and eliminate expensive material waste. Having a feedback loop in the process would allow the system to potentially ‘fix’ problem regions before a next powder layer is added. In this study we have investigated acoustic emission (AE) phenomena generated during the SLM process, and evaluated the results in terms of a single process parameter, of an in situ process monitoring technique.
Processing Strategy and PI Effects in Recognition Memory of Word Lists.
ERIC Educational Resources Information Center
Hodge, Milton H.; Britton, Bruce K.
Previous research by A. I. Schulman argued that an observed systematic decline in recognition memory in long word lists was due to the build-up of input and output proactive interference (PI). It also suggested that input PI resulted from process automatization; that is, each list item was processed or encoded in much the same way, producing a set…
NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)
NASA Technical Reports Server (NTRS)
Hoover, Jay C.
2004-01-01
Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.
Employee empowerment through team building and use of process control methods.
Willems, S
1998-02-01
The article examines the use of statistical process control and performance improvement techniques in employee empowerment. The focus is how these techniques provide employees with information to improve their productivity and become involved in the decision-making process. Findings suggest that at one Mississippi hospital employee improvement has had a positive effect on employee productivity, morale, and quality of work.
ERIC Educational Resources Information Center
Egorov, Sergey B.; Kapitanov, Alexey V.; Mitrofanov, Vladimir G.; Shvartsburg, Leonid E.; Ivanova, Natalia A.; Ryabov, Sergey A.
2016-01-01
The aim of article is to provide development of a unified assessment methodology in relation to various technological processes and the actual conditions of their implementation. To carry the energy efficiency analysis of the technological processes through comparison of the established power and the power consumed by the actual technological…
ERIC Educational Resources Information Center
Jacobus, Keith
A common theme in educational change literature is that principals do not truly understand the change process and therefore cannot successfully implement change. This paper presents findings of a study that examined the change processes that Colorado principals utilized when initiating and implementing change in their buildings. The study also…
STS-56, RSRM-031, 360L031 KSC processing configuration and data report
NASA Technical Reports Server (NTRS)
1993-01-01
KSC Processing Configuration and Data Report is being provided as a historical document and as an enhancement to future RSRM manufacturing and processing operations. The following sections provide information on segment receipt, aft booster build-up, booster assembly, and closeout for STS-56, RSRM flight set 36OL031. Section 2.0 contains a summary of RSRM-031 processing. Section 3.0 discusses any significant problems or special issues that require special attention. Sections 4.0 through 6.0 contain narrative descriptions of all key events, including any related processing problems. Appendix A provides engineering specifications and changes. A list and matrix of all problem reports (PR's) pertinent to this flight set is provided in Appendix B. The matrix was provided by the Thiokol LSS Quality Engineering office. Copies of the PR's generated during the processing of RSRM-031 will be provided upon request. Appendix C contains the motor set status matrix, which provides milestone dates for the RSRM-031 flow. Section 7.0 provides recommendations, if any, for the improvement of flight hardware processing. Section 8.0 contains data sheets that provide flight hardware parts and consumables information installed during the booster build-up and stacking operations by location, lot/serial number, expiration and cure dates/times, and installation dates.
STS-51, RSRM-033, 360T033 KSC processing configuration and data report
NASA Technical Reports Server (NTRS)
Hillard, Robert C.
1993-01-01
KSC Processing Configuration and Data Report is being provided as a historical document and as an enhancement to future RSRM manufacturing and processing operations. The following sections provide information on segment receipt, aft booster build up, motor assembly, and closeout for STS-51, RSRM flight set 360T033. Section 2.0 contains a summary of RSRM-033 processing. Section 3.0 discusses any significant problems or special issues that require special attention. Sections 4.0 through 6.0 contain narrative descriptions of all key events, including any related processing problems. Appendix A provides engineering specifications and changes. A list and matrix of all problem reports (PR's) pertinent to this flight set is provided in Appendix B. The matrix was provided by the Thiokol LSS Quality Engineering office. Copies of the PR's generated during the processing of RSRM-033 will be provided upon request. Appendix C contains the motor set status matrix, which provides milestone dates for the RSRM-033 flow. Section 7.0 provides recommendations for the improvement of flight hardware processing. Section 8.0 contains data sheets that provide flight hardware parts and consumable information installed during the booster build-up and stacking operations by location, lot/serial number, expiration and cure dates/times, and installation dates.
Tapia, Gustavo; Khairallah, Saad A.; Matthews, Manyalibo J.; ...
2017-09-22
Here, Laser Powder-Bed Fusion (L-PBF) metal-based additive manufacturing (AM) is complex and not fully understood. Successful processing for one material, might not necessarily apply to a different material. This paper describes a workflow process that aims at creating a material data sheet standard that describes regimes where the process can be expected to be robust. The procedure consists of building a Gaussian process-based surrogate model of the L-PBF process that predicts melt pool depth in single-track experiments given a laser power, scan speed, and laser beam size combination. The predictions are then mapped onto a power versus scan speed diagrammore » delimiting the conduction from the keyhole melting controlled regimes. This statistical framework is shown to be robust even for cases where experimental training data might be suboptimal in quality, if appropriate physics-based filters are applied. Additionally, it is demonstrated that a high-fidelity simulation model of L-PBF can equally be successfully used for building a surrogate model, which is beneficial since simulations are getting more efficient and are more practical to study the response of different materials, than to re-tool an AM machine for new material powder.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tapia, Gustavo; Khairallah, Saad A.; Matthews, Manyalibo J.
Here, Laser Powder-Bed Fusion (L-PBF) metal-based additive manufacturing (AM) is complex and not fully understood. Successful processing for one material, might not necessarily apply to a different material. This paper describes a workflow process that aims at creating a material data sheet standard that describes regimes where the process can be expected to be robust. The procedure consists of building a Gaussian process-based surrogate model of the L-PBF process that predicts melt pool depth in single-track experiments given a laser power, scan speed, and laser beam size combination. The predictions are then mapped onto a power versus scan speed diagrammore » delimiting the conduction from the keyhole melting controlled regimes. This statistical framework is shown to be robust even for cases where experimental training data might be suboptimal in quality, if appropriate physics-based filters are applied. Additionally, it is demonstrated that a high-fidelity simulation model of L-PBF can equally be successfully used for building a surrogate model, which is beneficial since simulations are getting more efficient and are more practical to study the response of different materials, than to re-tool an AM machine for new material powder.« less
Supporting virtual enterprise design by a web-based information model
NASA Astrophysics Data System (ADS)
Li, Dong; Barn, Balbir; McKay, Alison; de Pennington, Alan
2001-10-01
Development of IT and its applications have led to significant changes in business processes. To pursue agility, flexibility and best service to customers, enterprises focus on their core competence and dynamically build relationships with partners to form virtual enterprises as customer driven temporary demand chains/networks. Building the networked enterprise needs responsively interactive decisions instead of a single-direction partner selection process. Benefits and risks in the combination should be systematically analysed, and aggregated information about value-adding abilities and risks of networks needs to be derived from interactions of all partners. In this research, a hierarchical information model to assess partnerships for designing virtual enterprises was developed. Internet technique has been applied to the evaluation process so that interactive decisions can be visualised and made responsively during the design process. The assessment is based on the process which allows each partner responds to requirements of the virtual enterprise by planning its operational process as a bidder. The assessment is then produced by making an aggregated value to represent prospect of the combination of partners given current bidding. Final design is a combination of partners with the greatest total value-adding capability and lowest risk.
Computational Process Modeling for Additive Manufacturing (OSU)
NASA Technical Reports Server (NTRS)
Bagg, Stacey; Zhang, Wei
2015-01-01
Powder-Bed Additive Manufacturing (AM) through Direct Metal Laser Sintering (DMLS) or Selective Laser Melting (SLM) is being used by NASA and the Aerospace industry to "print" parts that traditionally are very complex, high cost, or long schedule lead items. The process spreads a thin layer of metal powder over a build platform, then melts the powder in a series of welds in a desired shape. The next layer of powder is applied, and the process is repeated until layer-by-layer, a very complex part can be built. This reduces cost and schedule by eliminating very complex tooling and processes traditionally used in aerospace component manufacturing. To use the process to print end-use items, NASA seeks to understand SLM material well enough to develop a method of qualifying parts for space flight operation. Traditionally, a new material process takes many years and high investment to generate statistical databases and experiential knowledge, but computational modeling can truncate the schedule and cost -many experiments can be run quickly in a model, which would take years and a high material cost to run empirically. This project seeks to optimize material build parameters with reduced time and cost through modeling.
Polyglot Programming in Applications Used for Genetic Data Analysis
Nowak, Robert M.
2014-01-01
Applications used for the analysis of genetic data process large volumes of data with complex algorithms. High performance, flexibility, and a user interface with a web browser are required by these solutions, which can be achieved by using multiple programming languages. In this study, I developed a freely available framework for building software to analyze genetic data, which uses C++, Python, JavaScript, and several libraries. This system was used to build a number of genetic data processing applications and it reduced the time and costs of development. PMID:25197633
2001-06-20
KENNEDY SPACE CENTER, Fla. -- An aerial view of Launch Complex 39 shows the south and west sides of the Vehicle Assembly Building. The curved roadway heading to the VAB leads to the high bay 2, the Safe Haven facility constructed in 2000. The white building in the foreground is the Processing Control Center. Beyond it is the Orbiter Processing Facility, bays 1 and 2. The OPF bay 3 is farther still, closer to the VAB. Farther in the background are the waters of Banana Creek in the Merritt Island National Wildlife Refuge
ERIC Educational Resources Information Center
Weaver, Kim M.
2005-01-01
In this unit, elementary students design and build a lunar plant growth chamber using the Engineering Design Process. The purpose of the unit is to help students understand and apply the design process as it relates to plant growth on the moon. This guide includes six lessons, which meet a number of national standards and benchmarks in…
Polyglot programming in applications used for genetic data analysis.
Nowak, Robert M
2014-01-01
Applications used for the analysis of genetic data process large volumes of data with complex algorithms. High performance, flexibility, and a user interface with a web browser are required by these solutions, which can be achieved by using multiple programming languages. In this study, I developed a freely available framework for building software to analyze genetic data, which uses C++, Python, JavaScript, and several libraries. This system was used to build a number of genetic data processing applications and it reduced the time and costs of development.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cordero, Zachary C.; Meyer, Harry M.; Nandwana, Peeyush
Electrons injected into the build envelope during powder-bed electron-beam additive manufacturing can accumulate on the irradiated particles and cause them to repel each other. Furthermore, these electrostatic forces can grow so large that they drive the particles out of the build envelope in a process known as smoking. Here, a model of powder bed charging is formulated and used to develop criteria that predict the conditions under which the powder bed will smoke. These criteria suggest dependences on particle size, pre-heat temperature, and process parameters that align closely with those observed in practice.
NASA Astrophysics Data System (ADS)
Poerbo, Heru W.; Martokusumo, Widjaja; Donny Koerniawan, M.; Aulia Ardiani, Nissa; Krisanti, Susan
2017-12-01
The Local Government of Bandung city has stipulated a Green Building regulation through the Peraturan Walikota Number 1023/2016. Signed by the mayor in October 2016, Bandung became the first city in Indonesia that put green building as mandatory requirement in the building permit (IMB) process. Green Building regulation is intended to have more efficient consumption of energy and water, improved indoor air quality, management of liquid and solid waste etc. This objective is attained through various design method in building envelope, ventilation and air conditioning system, lighting, indoor transportation system, and electrical system. To minimize energy consumption of buildings that have large openings, sun shading device is often utilized together with low-E glass panes. For buildings in hot humid tropical climate, this method reduces indoor air temperature and thus requires less energy for air conditioning. Indoor air quality is often done by monitoring the carbon dioxide levels. Application of algae as part of building system façade has recently been introduced as replacement of large glass surface in the building façade. Algae are not yet included in the green building regulation because it is relatively new. The research will investigate, with the help of the modelling process and extensive literature, how effective is the implementation of algae in building façade to reduce energy consumption and improve its indoor air quality. This paper is written based on the design of ITB Innovation Park as an ongoing architectural design-based research how the algae-integrated building façade affects the energy consumption.
Adopting software quality measures for healthcare processes.
Yildiz, Ozkan; Demirörs, Onur
2009-01-01
In this study, we investigated the adoptability of software quality measures for healthcare process measurement. Quality measures of ISO/IEC 9126 are redefined from a process perspective to build a generic healthcare process quality measurement model. Case study research method is used, and the model is applied to a public hospital's Entry to Care process. After the application, weak and strong aspects of the process can be easily observed. Access audibility, fault removal, completeness of documentation, and machine utilization are weak aspects and these aspects are the candidates for process improvement. On the other hand, functional completeness, fault ratio, input validity checking, response time, and throughput time are the strong aspects of the process.
65. BUILDING NO. 554, REWORK POWDER GRINDING HOUSE, PULVERIZING, WATER ...
65. BUILDING NO. 554, REWORK POWDER GRINDING HOUSE, PULVERIZING, WATER DRY HOUSE, LOOKING SOUTH AT NORTH SIDE (DEMOLITION IN PROGRESS) OF BUILDING ONCE USED FOR REWORK POWDER GRINDING AND PULVERIZING (SEE NJ-36-C-33 FOR DIAGRAM OF THIS RECLAMATION PROCESS). THIS BUILDING ALSO SERVED AS A WATER DRY HOUSE. - Picatinny Arsenal, 500 Area, Powder Factory & Power House, State Route 15 near I-80, Dover, Morris County, NJ
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jiang, Wei; Gowri, Krishnan; Lane, Michael D.
2009-09-28
This Technical Support Document (TSD) describes the process, methodology and assumptions for development of the 50% Energy Savings Design Technology Packages for Highway Lodging Buildings, a design guidance document intended to provide recommendations for achieving 50% energy savings in highway lodging properties over the energy-efficiency levels contained in ANSI/ASHRAE/IESNA Standard 90.1-2004, Energy Standard for Buildings Except Low-Rise Residential Buildings.
Autotune Calibrates Models to Building Use Data
None
2018-01-16
Models of existing buildings are currently unreliable unless calibrated manually by a skilled professional. Autotune, as the name implies, automates this process by calibrating the model of an existing building to measured data, and is now available as open source software. This enables private businesses to incorporate Autotune into their products so that their customers can more effectively estimate cost savings of reduced energy consumption measures in existing buildings.
DOT National Transportation Integrated Search
1999-09-01
This booklet presents some of the successes of the community-sensitive transportation facility development process. Although a comprehensive process is described here, not every project involves the full range of steps. By applying the techniques out...
Snakes in the Grass: Weaving Success for Everyone.
ERIC Educational Resources Information Center
Ide, Janet L.
2000-01-01
Describes "Snakes in the Grass," a weaving project used with special needs students. Discusses the preliminary skill-building activities used, the process for creating the students' individual snakes, and the preparation and process for how the students wove the snakes. (CMK)
An approach to separating the levels of hierarchical structure building in language and mathematics.
Makuuchi, Michiru; Bahlmann, Jörg; Friederici, Angela D
2012-07-19
We aimed to dissociate two levels of hierarchical structure building in language and mathematics, namely 'first-level' (the build-up of hierarchical structure with externally given elements) and 'second-level' (the build-up of hierarchical structure with internally represented elements produced by first-level processes). Using functional magnetic resonance imaging, we investigated these processes in three domains: sentence comprehension, arithmetic calculation (using Reverse Polish notation, which gives two operands followed by an operator) and a working memory control task. All tasks required the build-up of hierarchical structures at the first- and second-level, resulting in a similar computational hierarchy across language and mathematics, as well as in a working memory control task. Using a novel method that estimates the difference in the integration cost for conditions of different trial durations, we found an anterior-to-posterior functional organization in the prefrontal cortex, according to the level of hierarchy. Common to all domains, the ventral premotor cortex (PMv) supports first-level hierarchy building, while the dorsal pars opercularis (POd) subserves second-level hierarchy building, with lower activation for language compared with the other two tasks. These results suggest that the POd and the PMv support domain-general mechanisms for hierarchical structure building, with the POd being uniquely efficient for language.
NASA Astrophysics Data System (ADS)
Noerwasito, Vincentius Totok; Nasution, Tanti Satriana Rosary
2017-11-01
Utilization of local building materials in a residential location in mountainous area is very important, considering local material as a low-energy building material because of low transport energy. The local building materials used in this study are walls made from soil blocks. The material was made by the surrounding community from compacted soil without burning process. To maximize the potential of soil block to the outdoor temperature in the mountains, it is necessary to add non-local building materials as an insulator from the influence of the outside air. The insulator was calcium silicate panel. The location of the research is Trawas sub-district, Mojokerto regency, which is a mountainous area. The research problem is on applying the composition of local materials and calcium silicate panels that it will be able to meet the requirements as a wall building material and finding to what extent the impact of the wall against indoor temperature. The result from this research was the application of soil block walls insulated by calcium silicate panels in a building model. Besides, because of the utilization of those materials, the building has a specific difference between indoor and outdoor temperature. Thus, this model can be applied in mountainous areas in Indonesia.
Effect of processing parameters on FDM process
NASA Astrophysics Data System (ADS)
Chari, V. Srinivasa; Venkatesh, P. R.; Krupashankar, Dinesh, Veena
2018-04-01
This paper focused on the process parameters on fused deposition modeling (FDM). Infill, resolution, temperature are the process variables considered for experimental studies. Compression strength, Hardness test microstructure are the outcome parameters, this experimental study done based on the taguchi's L9 orthogonal array is used. Taguchi array used to build the 9 different models and also to get the effective output results on the under taken parameters. The material used for this experimental study is Polylactic Acid (PLA).
Making the purchase decision: factors other than price.
Lyons, D M
1992-05-01
Taking price out of the limelight and concentrating on customer relations, mutual respect, and build-in/buy-in; involving the user; developing communication and evaluation processes; and being process oriented to attain the results needed require commitment on the part of administration and materiel management. There must be a commitment of time to develop the process, commitment of resources to work through the process, and a commitment of support to enhance the process. With those three parameters in place, price will no longer be the only factor in the purchasing decision.
Generic Health Management: A System Engineering Process Handbook Overview and Process
NASA Technical Reports Server (NTRS)
Wilson, Moses Lee; Spruill, Jim; Hong, Yin Paw
1995-01-01
Health Management, a System Engineering Process, is one of those processes-techniques-and-technologies used to define, design, analyze, build, verify, and operate a system from the viewpoint of preventing, or minimizing, the effects of failure or degradation. It supports all ground and flight elements during manufacturing, refurbishment, integration, and operation through combined use of hardware, software, and personnel. This document will integrate Health Management Processes (six phases) into five phases in such a manner that it is never a stand alone task/effort which separately defines independent work functions.
Search and Determine Integrated Environment (SADIE)
NASA Astrophysics Data System (ADS)
Sabol, C.; Schumacher, P.; Segerman, A.; Coffey, S.; Hoskins, A.
2012-09-01
A new and integrated high performance computing software applications package called the Search and Determine Integrated Environment (SADIE) is being jointly developed and refined by the Air Force and Naval Research Laboratories (AFRL and NRL) to automatically resolve uncorrelated tracks (UCTs) and build a more complete space object catalog for improved Space Situational Awareness (SSA). The motivation for SADIE is to respond to very challenging needs identified and guidance received from Air Force Space Command (AFSPC) and other senior leaders to develop this technology to support the evolving Joint Space Operations Center (JSpOC) and Alternate Space Control Center (ASC2)-Dahlgren. The JSpOC and JMS SSA mission requirements and threads flow down from the United States Strategic Command (USSTRATCOM). The SADIE suite includes modification and integration of legacy applications and software components that include Search And Determine (SAD), Satellite Identification (SID), and Parallel Catalog (Parcat), as well as other utilities and scripts to enable end-to-end catalog building and maintenance in a parallel processing environment. SADIE is being developed to handle large catalog building challenges in all orbit regimes and includes the automatic processing of radar, fence, and optical data. Real data results are provided for the processing of Air Force Space Surveillance System fence observations and for the processing of Space Surveillance Telescope optical data.
Interdiffusion of Polycarbonate in Fused Deposition Modeling Welds
NASA Astrophysics Data System (ADS)
Seppala, Jonathan; Forster, Aaron; Satija, Sushil; Jones, Ronald; Migler, Kalman
2015-03-01
Fused deposition modeling (FDM), a now common and inexpensive additive manufacturing method, produces 3D objects by extruding molten polymer layer-by-layer. Compared to traditional polymer processing methods (injection, vacuum, and blow molding), FDM parts have inferior mechanical properties, surface finish, and dimensional stability. From a polymer processing point of view the polymer-polymer weld between each layer limits the mechanical strength of the final part. Unlike traditional processing methods, where the polymer is uniformly melted and entangled, FDM welds are typically weaker due to the short time available for polymer interdiffusion and entanglement. To emulate the FDM process thin film bilayers of polycarbonate/d-polycarbonate were annealed using scaled times and temperatures accessible in FDM. Shift factors from Time-Temperature Superposition, measured by small amplitude oscillatory shear, were used to calculate reasonable annealing times (min) at temperatures below the actual extrusion temperature. The extent of interdiffusion was then measured using neutron reflectivity. Analogous specimens were prepared to characterize the mechanical properties. FDM build parameters were then related to interdiffusion between welded layers and mechanical properties. Understating the relationship between build parameters, interdiffusion, and mechanical strength will allow FDM users to print stronger parts in an intelligent manner rather than using trial-and-error and build parameter lock-in.
NASA Astrophysics Data System (ADS)
Yunus, Riduan; Noor, Siti Rahimah Mohd; Halid Abdullah, Abd; Nagapan, Sasitharan; Hamid, Abdul Rahim Abdul; Tajudin, Saiful Azhar Ahmad; Rohani Mat Jusof, Siti
2017-08-01
Productivity in the manufacturing process of building components can be increased by optimising each advantage that is available in each activity. Identification of critical success factors (CSFs) for lean thinking in the Industrialised Building System (IBS) will be able to minimise cost and reduce time needed to complete a project. The focus of lean thinking in construction is on the production process and the client’s requirement. In developing countries such as Malaysia, the integration of lean thinking in IBS applications is still low and there is a shortage of comprehensive strategies to integrate lean thinking. As key stakeholders, feedback from contractors, manufacturers, developers and the local authority will be able to help the identification of CSFs in integrating lean thinking in IBS applications. The data was collected through a questionnaire survey and analysed quantitatively. There are 31 CSFs for lean thinking in IBS which have been identified in this study. A conceptual model was developed to assist researchers in investigating the influences of CSFs for lean thinking in IBS applications. This study will assist construction players to improvise their manufacturing process in the implementation of IBS to eliminate unnecessary activities and focus instead on significant processes without generating physical and non-physical waste.
Building Physics Test Cases | Buildings | NREL
building physics test cases in BESTEST-EX. In these cases, the model inputs that describe the house are programs. This diagram provides an overview of the BESTEST-EX physics case process. On the left side of the diagram is a box labeled "BESTEST-EX Document" with a list that contains two bulleted items. The
Collaborative Knowledge Building with Wikis: The Impact of Redundancy and Polarity
ERIC Educational Resources Information Center
Moskaliuk, Johannes; Kimmerle, Joachim; Cress, Ulrike
2012-01-01
Wikis as shared digital artifacts may enable users to participate in processes of knowledge building. To what extent and with which quality knowledge building can take place is assumed to depend on the interrelation between people's prior knowledge and the information available in a wiki. In two experimental studies we examined the impact on…
ERIC Educational Resources Information Center
Bhola, H. S.
The definitional and conceptual structure of the Esman model of institution building is described in great detail, emphasizing its philosophic and process assumptions and its latent dynamics. The author systematically critiques the Esman model in terms of its (1) specificity to the universe of institution building, (2) generalizability across…
Towards an Interdisciplinary Model of Practice for Participatory Building Design in Education
ERIC Educational Resources Information Center
Könings, Karen D.; Bovill, Catherine; Woolner, Pamela
2017-01-01
It is recognised that educational environments influence learning experiences, so it is important to ensure that educational buildings are designed to be fit for purpose. In order to ensure that educational buildings meet the needs of those who use them, all relevant stakeholders should be involved in the design process. However, this is not…
Wood as a sustainable building material
Robert H. Falk
2010-01-01
Few building materials possess the environmental benefits of wood. It is not only our most widely used building material but also one with characteristics that make it suitable for a wide range of applications. As described in the many chapters of this handbook, efficient, durable, and useful wood products produced from trees can range from a minimally processed log at...
Countdown to a New Library: Managing the Building Project.
ERIC Educational Resources Information Center
Woodward, Jeannette
This book outlines information needed to embark on a library building project, serving as an overview of the entire process, not merely focusing on the librarian's traditional role. The book begins by discussing ways librarians can prepare themselves and their staff to function effectively in the midst of a building project. Chapter 2 focuses on…
A Visual Information Tool for User Participation during the Lifecycle of School Building Design: BIM
ERIC Educational Resources Information Center
Koutamanis, Alexander; Heuer, Jos; Könings, Karen D.
2017-01-01
User participation is a key element in decision processes concerning the accommodation of dynamic organisations such as schools. This article addresses the discrepancy between the perspectives of the architects and engineers, as the makers of school buildings, and school management, teachers and students, as the users of the buildings, and…
OPERATOR BURDEN IN METAL ADDITIVE MANUFACTURING
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elliott, Amy M; Love, Lonnie J
2016-01-01
Additive manufacturing (AM) is an emerging manufacturing process that creates usable machine parts via layer-by-layer joining of a stock material. With this layer-wise approach, high-performance geometries can be created which are impossible with traditional manufacturing methods. Metal AM technology has the potential to significantly reduce the manufacturing burden of developing custom hardware; however, a major consideration in choosing a metal AM system is the required amount of operator involvement (i.e., operator burden) in the manufacturing process. The operator burden not only determines the amount of operator training and specialization required but also the usability of the system in a facility.more » As operators of several metal AM processes, the Manufacturing Demonstration Facility (MDF) at Oak Ridge National Labs is uniquely poised to provide insight into requirements for operator involvement in each of the three major metal AM processes. The paper covers an overview of each of the three metal AM technologies, focusing on the burden on the operator to complete the build cycle, process the part for final use, and reset the AM equipment for future builds.« less
Baum, Sarah H.; Stevenson, Ryan A.; Wallace, Mark T.
2015-01-01
Although sensory processing challenges have been noted since the first clinical descriptions of autism, it has taken until the release of the fifth edition of the Diagnostic and Statistical Manual of Mental Disorders (DSM-5) in 2013 for sensory problems to be included as part of the core symptoms of autism spectrum disorder (ASD) in the diagnostic profile. Because sensory information forms the building blocks for higher-order social and cognitive functions, we argue that sensory processing is not only an additional piece of the puzzle, but rather a critical cornerstone for characterizing and understanding ASD. In this review we discuss what is currently known about sensory processing in ASD, how sensory function fits within contemporary models of ASD, and what is understood about the differences in the underlying neural processing of sensory and social communication observed between individuals with and without ASD. In addition to highlighting the sensory features associated with ASD, we also emphasize the importance of multisensory processing in building perceptual and cognitive representations, and how deficits in multisensory integration may also be a core characteristic of ASD. PMID:26455789
Role of Process Control in Improving Space Vehicle Safety A Space Shuttle External Tank Example
NASA Technical Reports Server (NTRS)
Safie, Fayssal M.; Nguyen, Son C.; Burleson, Keith W.
2006-01-01
Developing a safe and reliable space vehicle requires good design and good manufacturing, or in other words "design it right and build it right". A great design can be hard to build or manufacture mainly due to difficulties related to quality. Specifically, process control can be a challenge. As a result, the system suffers from low quality which leads to low reliability and high system risk. The Space Shuttle has experienced some of those cases, but has overcome these difficulties through extensive redesign efforts and process enhancements. One example is the design of the hot gas temperature sensor on the Space Shuttle Main Engine (SSME), which resulted in failure of the sensor in flight and led to a redesign of the sensor. The most recent example is the Space Shuttle External Tank (ET) Thermal Protection System (TPS) reliability issues that contributed to the Columbia accident. As a result, extensive redesign and process enhancement activities have been performed over the last two years to minimize the sensitivities and difficulties of the manual TPS application process.
Building a team through a strategic planning process.
Albert, Debra; Priganc, Dave
2014-01-01
Strategic planning is a process often left to senior hospital leadership, with limited input from unit-level, bedside patient care providers. This frequent approach to strategic planning misses the opportunity to engage a wide range of employees, build a shared sense of commitment, produce a collaborative team environment, and to generate greater acceptance of the plan. The Patient Care Services division at the University of Chicago Medicine used a strategic planning process that incorporated 360-degree input from both within the Patient Care Services division and outside of the division. The result is a strategic vision and plan that, shaped by broad-based input from both internal and external constituencies, is strengthened by the team that emerged from the process. Through the process of identifying a common understanding of the group's future direction, a shared purpose was created that transcended traditional professional boundaries and shaped a cohesive team focused on effective and efficient patient care. Now, with a focused strategic plan and a team centered on a shared purpose, the team is beginning to effectively deliver on the plan.
ABM Drag_Pass Report Generator
NASA Technical Reports Server (NTRS)
Fisher, Forest; Gladden, Roy; Khanampornpan, Teerapat
2008-01-01
dragREPORT software was developed in parallel with abmREPORT, which is described in the preceding article. Both programs were built on the capabilities created during that process. This tool generates a drag_pass report that summarizes vital information from the MRO aerobreaking drag_pass build process to facilitate both sequence reviews and provide a high-level summarization of the sequence for mission management. The script extracts information from the ENV, SSF, FRF, SCMFmax, and OPTG files, presenting them in a single, easy-to-check report providing the majority of parameters needed for cross check and verification as part of the sequence review process. Prior to dragReport, all the needed information was spread across a number of different files, each in a different format. This software is a Perl script that extracts vital summarization information and build-process details from a number of source files into a single, concise report format used to aid the MPST sequence review process and to provide a high-level summarization of the sequence for mission management reference. This software could be adapted for future aerobraking missions to provide similar reports, review and summarization information.
Central Control Room in the Engine Research Building
1968-11-21
Operators in the Engine Research Building’s Central Control Room at the National Aeronautics and Space Administration (NASA) Lewis Research Center. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful a collection of compressors and exhausters located in the central portion of the basement provides process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities. The panels on the wall contain schematics with indicator lights and instrumentation for the atmospheric exhaust, altitude exhaust, refrigerated air, and process air systems. The process air equipment included twelve exhausters, four compressors, refrigeration system, cooling water, and an exhaust system. The operators in the control room kept in contact with engineers running the process air system and those conducting the tests in the test cells. The operators also coordinated with the local power companies to make sure enough electricity was available to operate the powerful compressors and exhausters.