The role of engineering in the flight equipment purchasing process
NASA Technical Reports Server (NTRS)
1977-01-01
The role of the airline engineering department in the flight equipment acquisition process is examined. The data for the study was collected from six airlines. The principal findings of the study include: (1) engineering activities permeate, but do not dominate the airline flight equipment decision process. (2) The principal criterion for the flight equipment acquisition decision is return on investment. (3) The principal sources of information for the airline engineering departments in the monitoring process are the manufacturers of equipment. Subsidiary information sources include NASA publications and conferences, among others and (4) The engineering department is the principal communication channel for technical information.
Code of Federal Regulations, 2012 CFR
2012-07-01
... subpart that references this subpart. Batch process means a process in which the equipment is fed... generally emptied. Examples of industries that use batch processes include pharmaceutical production and pesticide production. Batch product-process equipment train means the collection of equipment (e.g...
Code of Federal Regulations, 2013 CFR
2013-07-01
... subpart that references this subpart. Batch process means a process in which the equipment is fed... generally emptied. Examples of industries that use batch processes include pharmaceutical production and pesticide production. Batch product-process equipment train means the collection of equipment (e.g...
Code of Federal Regulations, 2014 CFR
2014-07-01
... subpart that references this subpart. Batch process means a process in which the equipment is fed... generally emptied. Examples of industries that use batch processes include pharmaceutical production and pesticide production. Batch product-process equipment train means the collection of equipment (e.g...
Code of Federal Regulations, 2011 CFR
2011-07-01
... subpart that references this subpart. Batch process means a process in which the equipment is fed... generally emptied. Examples of industries that use batch processes include pharmaceutical production and pesticide production. Batch product-process equipment train means the collection of equipment (e.g...
Code of Federal Regulations, 2013 CFR
2013-07-01
... to the requirements of this subpart, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for..., infrequent, and unavoidable failure of air pollution control equipment, process equipment, or a process to...
Code of Federal Regulations, 2014 CFR
2014-07-01
... to the requirements of this subpart, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for..., infrequent, and unavoidable failure of air pollution control equipment, process equipment, or a process to...
7 CFR 4284.924 - Ineligible uses of grant and matching funds.
Code of Federal Regulations, 2013 CFR
2013-01-01
... or facility (including a processing facility); (d) Purchase, lease purchase, or install fixed equipment, including processing equipment; (e) Purchase or repair vehicles, including boats; (f) Pay for the... processing and marketing of the value-added product; (h) Fund research and development; (i) Fund political or...
7 CFR 4284.924 - Ineligible uses of grant and matching funds.
Code of Federal Regulations, 2014 CFR
2014-01-01
... or facility (including a processing facility); (d) Purchase, lease purchase, or install fixed equipment, including processing equipment; (e) Purchase or repair vehicles, including boats; (f) Pay for the... processing and marketing of the value-added product; (h) Fund research and development; (i) Fund political or...
7 CFR 4284.924 - Ineligible uses of grant and matching funds.
Code of Federal Regulations, 2012 CFR
2012-01-01
... or facility (including a processing facility); (d) Purchase, lease purchase, or install fixed equipment, including processing equipment; (e) Purchase or repair vehicles, including boats; (f) Pay for the... processing and marketing of the value-added product; (h) Fund research and development; (i) Fund political or...
40 CFR 423.11 - Specialized definitions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... not included. (c) The term chemical metal cleaning waste means any wastewater resulting from the cleaning of any metal process equipment with chemical compounds, including, but not limited to, boiler tube... chemical cleaning compounds] any metal process equipment including, but not limited to, boiler tube...
40 CFR 423.11 - Specialized definitions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... not included. (c) The term chemical metal cleaning waste means any wastewater resulting from the cleaning of any metal process equipment with chemical compounds, including, but not limited to, boiler tube... chemical cleaning compounds] any metal process equipment including, but not limited to, boiler tube...
40 CFR 423.11 - Specialized definitions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... air conditioning wastes are not included. (c) The term chemical metal cleaning waste means any wastewater resulting from the cleaning of any metal process equipment with chemical compounds, including, but... from cleaning [with or without chemical cleaning compounds] any metal process equipment including, but...
Code of Federal Regulations, 2010 CFR
2010-07-01
... being used will be based on information available to the Administrator, which may include, but is not... techniques, or the control system and process monitoring equipment during a malfunction in a manner... the process and control system monitoring equipment, and shall include a standardized checklist to...
Code of Federal Regulations, 2011 CFR
2011-07-01
... being used will be based on information available to the Administrator, which may include, but is not... techniques, or the control system and process monitoring equipment during a malfunction in a manner... the process and control system monitoring equipment, and shall include a standardized checklist to...
40 CFR 60.276 - Recordkeeping and reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
...; (4) Flow diagram of process and emission capture equipment including other equipment or process(es... values exceeding ±15 percent of the value established under § 60.274(c) or operation at flow rates lower...
40 CFR 60.276 - Recordkeeping and reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
...; (4) Flow diagram of process and emission capture equipment including other equipment or process(es... values exceeding ±15 percent of the value established under § 60.274(c) or operation at flow rates lower...
40 CFR 60.276 - Recordkeeping and reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
...; (4) Flow diagram of process and emission capture equipment including other equipment or process(es... values exceeding ±15 percent of the value established under § 60.274(c) or operation at flow rates lower...
40 CFR 60.276 - Recordkeeping and reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
...; (4) Flow diagram of process and emission capture equipment including other equipment or process(es... values exceeding ±15 percent of the value established under § 60.274(c) or operation at flow rates lower...
40 CFR 60.276 - Recordkeeping and reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
...; (4) Flow diagram of process and emission capture equipment including other equipment or process(es... values exceeding ±15 percent of the value established under § 60.274(c) or operation at flow rates lower...
Silicon production process evaluations
NASA Technical Reports Server (NTRS)
1982-01-01
Chemical engineering analyses involving the preliminary process design of a plant (1,000 metric tons/year capacity) to produce silicon via the technology under consideration were accomplished. Major activities in the chemical engineering analyses included base case conditions, reaction chemistry, process flowsheet, material balance, energy balance, property data, equipment design, major equipment list, production labor and forward for economic analysis. The process design package provided detailed data for raw materials, utilities, major process equipment and production labor requirements necessary for polysilicon production in each process.
Code of Federal Regulations, 2011 CFR
2011-07-01
... shall have the meaning given them in the Act and in this section. Batch process means a process in which... which the equipment is generally emptied. Examples of industries that use batch processes include pharmaceutical production and pesticide production. Batch product-process equipment train means the collection of...
Code of Federal Regulations, 2013 CFR
2013-07-01
... shall have the meaning given them in the Act and in this section. Batch process means a process in which... which the equipment is generally emptied. Examples of industries that use batch processes include pharmaceutical production and pesticide production. Batch product-process equipment train means the collection of...
Code of Federal Regulations, 2012 CFR
2012-07-01
... shall have the meaning given them in the Act and in this section. Batch process means a process in which... which the equipment is generally emptied. Examples of industries that use batch processes include pharmaceutical production and pesticide production. Batch product-process equipment train means the collection of...
Code of Federal Regulations, 2014 CFR
2014-07-01
... shall have the meaning given them in the Act and in this section. Batch process means a process in which... which the equipment is generally emptied. Examples of industries that use batch processes include pharmaceutical production and pesticide production. Batch product-process equipment train means the collection of...
Illustrated glossary of process equipment. Chinese/English/French edition
DOE Office of Scientific and Technical Information (OSTI.GOV)
Paruit, B.
1984-01-01
Here is a volume of process equipment and terms in standard Mandarin Chinese, English, and French. As with the English/French/Spanish edition, each page illustrates a particular piece of equipment, with captions identifying the key components. Glossaries at the end of each major section include the Romanized pronunciation of the Chinese.
48 CFR 52.234-1 - Industrial Resources Developed Under Defense Production Act Title III.
Code of Federal Regulations, 2010 CFR
2010-10-01
... materials, services, processes, or manufacturing equipment (including the processes, technologies, and ancillary services for the use of such equipment) established or maintained under the authority of Title III...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-01-01
Volume 1 describes the proposed plant: KBW gasification process, ICI low-pressure methanol process and Mobil M-gasoline process, and also with ancillary processes, such as oxygen plant, shift process, RECTISOL purification process, sulfur recovery equipment and pollution control equipment. Numerous engineering diagrams are included. (LTN)
7 CFR 247.25 - Allowable uses of administrative funds and other funds.
Code of Federal Regulations, 2013 CFR
2013-01-01
... equipment include automated information systems, automated data processing equipment, and other computer... sale of packing containers or pallets, and the salvage of commodities. Program income does not include...
7 CFR 247.25 - Allowable uses of administrative funds and other funds.
Code of Federal Regulations, 2014 CFR
2014-01-01
... equipment include automated information systems, automated data processing equipment, and other computer... sale of packing containers or pallets, and the salvage of commodities. Program income does not include...
7 CFR 247.25 - Allowable uses of administrative funds and other funds.
Code of Federal Regulations, 2011 CFR
2011-01-01
... equipment include automated information systems, automated data processing equipment, and other computer... sale of packing containers or pallets, and the salvage of commodities. Program income does not include...
7 CFR 247.25 - Allowable uses of administrative funds and other funds.
Code of Federal Regulations, 2012 CFR
2012-01-01
... equipment include automated information systems, automated data processing equipment, and other computer... sale of packing containers or pallets, and the salvage of commodities. Program income does not include...
40 CFR 57.203 - Contents of the application.
Code of Federal Regulations, 2014 CFR
2014-07-01
... application shall also contain the following information: (1) A process flow diagram of the smelter, including current process and instrumentation diagrams for all processes or equipment which may emit or affect the... equipment (flow rates, temperature, volumes, compositions, and variations over time); and a list of all...
40 CFR 57.203 - Contents of the application.
Code of Federal Regulations, 2012 CFR
2012-07-01
... application shall also contain the following information: (1) A process flow diagram of the smelter, including current process and instrumentation diagrams for all processes or equipment which may emit or affect the... equipment (flow rates, temperature, volumes, compositions, and variations over time); and a list of all...
40 CFR 57.203 - Contents of the application.
Code of Federal Regulations, 2011 CFR
2011-07-01
... application shall also contain the following information: (1) A process flow diagram of the smelter, including current process and instrumentation diagrams for all processes or equipment which may emit or affect the... equipment (flow rates, temperature, volumes, compositions, and variations over time); and a list of all...
40 CFR 57.203 - Contents of the application.
Code of Federal Regulations, 2013 CFR
2013-07-01
... application shall also contain the following information: (1) A process flow diagram of the smelter, including current process and instrumentation diagrams for all processes or equipment which may emit or affect the... equipment (flow rates, temperature, volumes, compositions, and variations over time); and a list of all...
Manning, T.K.; Smith, K.E.; Wood, C.D.; Williams, J.B.
1994-01-01
Water-quality samples were collected from Chicod Creek in the Coastal Plain Province of North Carolina during the summer of 1992 as part of the U.S. Geological Survey's National Water-Quality Assessment Program. Chicod Creek is in the Albemarle-Pamlico drainage area, one of four study units designated to test equipment and procedures for collecting and processing samples for the solid-phase extraction of selected pesticides, The equipment and procedures were used to isolate 47 pesticides, including organonitrogen, carbamate, organochlorine, organophosphate, and other compounds, targeted to be analyzed by gas chromatography/mass spectrometry. Sample-collection and processing equipment equipment cleaning and set-up procedures, methods pertaining to collecting, splitting, and solid-phase extraction of samples, and water-quality data resulting from the field test are presented in this report Most problems encountered during this intensive sampling exercise were operational difficulties relating to equipment used to process samples.
77 FR 6122 - Providing Refurbishment Services to Federal Agencies
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-07
... equipment? 5. Describe the process for disposing and recycling of failed equipment. Have all facilities in your recycling and disposal process been certified to safely recycle and manage electronics? If so... firms offering refurbishment services, including those developed specifically for recycling facilities...
Space processing applications payload equipment study. Volume 2E: Commercial equipment utility
NASA Technical Reports Server (NTRS)
Smith, A. G. (Editor)
1974-01-01
Examination of commercial equipment technologies revealed that the functional performance requirements of space processing equipment could generally be met by state-of-the-art design practices. Thus, an apparatus could be evolved from a standard item or derived by custom design using present technologies. About 15 percent of the equipment needed has no analogous commercial base of derivation and requires special development. This equipment is involved primarily with contactless heating and position control. The derivation of payloads using commercial equipment sources provides a broad and potentially cost-effective base upon which to draw. The derivation of payload equipment from commercial technologies poses other issues beyond that of the identifiable functional performance, but preliminary results on testing of selected equipment testing appear quite favorable. During this phase of the SPA study, several aspects of commercial equipment utility were assessed and considered. These included safety, packaging and structural, power conditioning (electrical/electronic), thermal and materials of construction.
Practical Applications of Data Processing to School Purchasing.
ERIC Educational Resources Information Center
California Association of School Business Officials, San Diego. Imperial Section.
Electronic data processing provides a fast and accurate system for handling large volumes of routine data. If properly employed, computers can perform myriad functions for purchasing operations, including purchase order writing; equipment inventory control; vendor inventory; and equipment acquisition, transfer, and retirement. The advantages of…
21 CFR 129.40 - Equipment and procedures.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) FOOD FOR HUMAN CONSUMPTION PROCESSING AND BOTTLING OF BOTTLED DRINKING WATER Equipment § 129.40 Equipment... intended use. This includes all collection and storage tanks, piping, fittings, connections, bottle washers...
21 CFR 129.40 - Equipment and procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) FOOD FOR HUMAN CONSUMPTION PROCESSING AND BOTTLING OF BOTTLED DRINKING WATER Equipment § 129.40 Equipment... intended use. This includes all collection and storage tanks, piping, fittings, connections, bottle washers...
Illustrated field guide for assessing external and internal anomalies in fish
Smith, Stephen B.; Donahue, Anne P.; Lipkin, Robin J.; Blazer, Vicki; Schmitt, Christopher J.; Goede, Ronald W.
2002-01-01
Procedures are described for processing fish for examination of external and internal anomalies and pathologies indicative of exposure to environmental contaminants and other peturbations. For the procedures described here, fish are captured (preferably by electrofishing) and held alive until processing (generally < 1 h). Fish are weighed, measured, and necropsied, and a scale sample is obtained from for age determination. Information is given for the collection and preservation of tissue samples for histopathological analysis. Photographs of most abnormalities are included along with normal conditions for easier identification of external (oral, head, eye, gill, opercula, and fin) and internal (liver, spleen, gonad, and kidney) anomalies. The report also includes recommendations for record keeping, sample labeling, and shipping records, equipment, supplies,and samples. A list of suggested equipment and supplies for field processing is included as are instructions for cleaning equipment.
1981-05-01
coating process in Explosives Manufacturing Line 2. The end products of the initial design effort are process flow diagrams, piping and...instrumentation diagrams, motor control schedules, interlock logic diagrams, piping installation drawings, typical instrument Installation details, equipment...structures, equipment, utilities, and process piping extending 1.5 m (5 ft) beyond the building or area were not included in the scope of work. Nitrolysis
fermentation and refining process. One of his favorite topics is in the design and commissioning of custom research equipment. His areas of expertise include: Project management Process design, equipment design , and fabrication Instrumentation and controls design and programming Data analysis and presentation
NASA-STD-(I)-6016, Standard Materials and Processes Requirements for Spacecraft
NASA Technical Reports Server (NTRS)
Pedley, Michael; Griffin, Dennis
2006-01-01
This document is directed toward Materials and Processes (M&P) used in the design, fabrication, and testing of flight components for all NASA manned, unmanned, robotic, launch vehicle, lander, in-space and surface systems, and spacecraft program/project hardware elements. All flight hardware is covered by the M&P requirements of this document, including vendor designed, off-the-shelf, and vendor furnished items. Materials and processes used in interfacing ground support equipment (GSE); test equipment; hardware processing equipment; hardware packaging; and hardware shipment shall be controlled to prevent damage to or contamination of flight hardware.
10 CFR 110.1 - Purpose and scope.
Code of Federal Regulations, 2010 CFR
2010-01-01
... zirconium, rotor and bellows equipment, maraging steel, nuclear reactor related equipment, including process... 10 Energy 2 2010-01-01 2010-01-01 false Purpose and scope. 110.1 Section 110.1 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL General Provisions...
Working with the superabrasives industry to optimize tooling for grinding brittle materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, J.S.; Piscotty, M.A.; Blaedel, K.L.
1996-05-01
The optics manufacturing industry is undertaking a significant modernization, as computer-numeric-controlled (CNC) equipment is joining or replacing open-loop equipment and hand lapping/polishing on the shop floor. Several prototype CNC lens grinding platforms employing ring tools are undergoing development and demonstration at the Center for Optics Manufacturing in Rochester, NY, and several machine tool companies have CNC product lines aimed at the optics industry. Benefits to using CNC ring tool grinding equipment include: essentially unlimited flexibility in selecting radii of curvature without special radiused tooling, the potential for CIM linkages to CAD workstations, and the cultural shift from craftsmen with undocumentedmore » procedures to CNC machine operators employing computerized routines for process control. In recent years, these developments, have inspired a number of US optics companies to invest in CNC equipment and participate in process development activities involving bound diamond tooling. This modernization process,extends beyond large optics companies that have historically embraced advanced equipment, to also include smaller optical shops where a shift to CNC equipment requires a significant company commitment. This paper addresses our efforts to optimize fine grinding wheels to support the new generation of CNC equipment. We begin with a discussion of how fine grinding fits into the optical production process, and then describe an initiative for improving the linkage between optics industry and the grinding wheel industry. For the purposes of this paper, we define fine wheels to have diamond sizes below 20 micrometers, which includes wheels used for what is sometimes called medium grinding (e.g. 10-20 micrometers diamond) and for fine grinding (e.g. 2-4 micrometers diamond).« less
40 CFR 63.2986 - How do I comply with the standards?
Code of Federal Regulations, 2010 CFR
2010-07-01
... or other control device or implement a process modification that reduces formaldehyde emissions from... and maintain your affected source, including air pollution control and monitoring equipment, according... malfunctioning process and air pollution control equipment. [67 FR 17835, Apr. 11, 2002, as amended at 71 FR...
Medical equipment libraries: implementation, experience and user satisfaction.
Keay, S; McCarthy, J P; Carey-Smith, B E
2015-01-01
The hospital-wide pooling and sharing of certain types of medical equipment can lead to both significant improvements in patient safety and financial advantages when compared with a department or ward-level equipment ownership system. In September 2003, a Medical Equipment Loan Service (MELS) was established, focusing initially on infusion pumps. The aims and expected benefits included; improving availability of equipment for both patients and clinical users, managing and reducing clinical risk, reducing equipment diversity, improving equipment management and reducing the overall cost of equipment provision. A user survey was carried out in 2005 and repeated in 2011. The results showed wide and continued satisfaction with the service. The process and difficulties of establishing the service and its development to include additional types of equipment are described. The benefits of managing medical equipment which is in widespread general use, through a MELS as part of a Clinical Engineering Department, are presented.
An Analysis for Capital Expenditure Decisions at a Naval Regional Medical Center.
1981-12-01
Service Equipment Review Committee 1. Portable defibrilator Computed tomographic scanner and cardioscope 2. ECG cart Automated blood cell counter 3. Gas...system sterilizer Gas system sterilizer 4. Automated blood cell Portable defibrilator and counter cardioscope 5. Computed tomographic ECG cart scanner...dictating and automated typing) systems. e. Filing equipment f. Automatic data processing equipment including data communications equipment. g
2008-10-07
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers check the equipment in the Multi-Purpose Logistics Module Leonardo, which is the payload for the STS-126 mission to the International Space Station. The 15-day flight will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station Solar Alpha Rotary Joints. Leonardo holds supplies and equipment, including equipment for the regenerative life support system, additional crew quarters and exercise equipment and spare hardware. Photo credit: NASA/Kim Shiflett
2008-10-07
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers check the equipment in the Multi-Purpose Logistics Module Leonardo, which is the payload for the STS-126 mission to the International Space Station. The 15-day flight will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station Solar Alpha Rotary Joints. Leonardo holds supplies and equipment, including equipment for the regenerative life support system, additional crew quarters and exercise equipment and spare hardware. Photo credit: NASA/Kim Shiflett
Food processors requirements met by radiation processing
NASA Astrophysics Data System (ADS)
Durante, Raymond W.
2002-03-01
Processing food using irradiation provides significant advantages to food producers by destroying harmful pathogens and extending shelf life without any detectable physical or chemical changes. It is expected that through increased public education, food irradiation will emerge as a viable commercial industry. Food production in most countries involves state of the art manufacturing, packaging, labeling, and shipping techniques that provides maximum efficiency and profit. In the United States, food sales are extremely competitive and profit margins small. Most food producers have heavily invested in equipment and are hesitant to modify their equipment. Meat and poultry producers in particular utilize sophisticated production machinery that processes enormous volumes of product on a continuous basis. It is incumbent on the food irradiation equipment suppliers to develop equipment that can easily merge with existing processes without requiring major changes to either the final food product or the process utilized to produce that product. Before a food producer can include irradiation as part of their food production process, they must be certain the available equipment meets their needs. This paper will examine several major requirements of food processors that will most likely have to be provided by the supplier of the irradiation equipment.
Automated Power-Distribution System
NASA Technical Reports Server (NTRS)
Ashworth, Barry; Riedesel, Joel; Myers, Chris; Miller, William; Jones, Ellen F.; Freeman, Kenneth; Walsh, Richard; Walls, Bryan K.; Weeks, David J.; Bechtel, Robert T.
1992-01-01
Autonomous power-distribution system includes power-control equipment and automation equipment. System automatically schedules connection of power to loads and reconfigures itself when it detects fault. Potential terrestrial applications include optimization of consumption of power in homes, power supplies for autonomous land vehicles and vessels, and power supplies for automated industrial processes.
LSA silicon material task closed-cycle process development
NASA Technical Reports Server (NTRS)
Roques, R. A.; Wakefield, G. F.; Blocher, J. M., Jr.; Browning, M. F.; Wilson, W.
1979-01-01
The initial effort on feasibility of the closed cycle process was begun with the design of the two major items of untested equipment, the silicon tetrachloride by product converter and the rotary drum reactor for deposition of silicon from trichlorosilane. The design criteria of the initial laboratory equipment included consideration of the reaction chemistry, thermodynamics, and other technical factors. Design and construction of the laboratory equipment was completed. Preliminary silicon tetrachloride conversion experiments confirmed the expected high yield of trichlorosilane, up to 98 percent of theoretical conversion. A preliminary solar-grade polysilicon cost estimate, including capital costs considered extremely conservative, of $6.91/kg supports the potential of this approach to achieve the cost goal. The closed cycle process appears to have a very likely potential to achieve LSA goals.
Up and running. Choosing the right equipment service option.
2011-08-01
If you're trying to decide between servicing your equipment in-house or using an outside party, you know that finding the best option can be complicated. To help manage the decision process, this article includes a matrix to organize and assess all relevant factors. We also discuss equipment maintenance insurance, which allows you to cap your service costs for some or all of your equipment.
ERIC Educational Resources Information Center
LOMBARDI, JOHN; WARBURTON, T. STANLEY
A STUDY OF THE POTENTIAL APPLICATIONS OF DATA PROCESSING EQUIPMENT AND SERVICES IN THIS MULTICAMPUS DISTRICT SHOWED THAT USES COULD BE DIVIDED INTO THREE CLASSES--(1) ADMINISTRATION AND SERVICES, INCLUDING DECISION MAKING, PROCESSING, COMMUNICATING, AND SUMMARIZING, (2) DIRECT AND INDIRECT SERVICES TO FACULTY MEMBERS, AND (3) INSTRUCTION. TO…
40 CFR 65.3 - Compliance with standards and operation and maintenance requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
...)(4)(i) and (ii) do not apply to Group 2A or Group 2B process vents. Compliance with design, equipment, work practice, and operational standards, including those for equipment leaks, shall be determined... this part. (5) Design, equipment, work practice, or operational standards. Paragraphs (b)(5)(i) and (ii...
Code of Federal Regulations, 2010 CFR
2010-01-01
... performance and safety during reactor operation. Also, in all cases precise control of processes, procedures... elements include equipment that: (1) Normally comes in direct contact with, or directly processes or... pellets; (2) Automatic welding machines especially designed or prepared for welding end caps onto the fuel...
Mobile three-dimensional visualisation technologies for clinician-led fall prevention assessments.
Hamm, Julian; Money, Arthur G; Atwal, Anita; Ghinea, Gheorghita
2017-08-01
The assistive equipment provision process is routinely carried out with patients to mitigate fall risk factors via the fitment of assistive equipment within the home. However, currently, over 50% of assistive equipment is abandoned by the patients due to poor fit between the patient and the assistive equipment. This paper explores clinician perceptions of an early stage three-dimensional measurement aid prototype, which provides enhanced assistive equipment provision process guidance to clinicians. Ten occupational therapists trialled the three-dimensional measurement aid prototype application; think-aloud and semi-structured interview data was collected. Usability was measured with the System Usability Scale. Participants scored three-dimensional measurement aid prototype as 'excellent' and agreed strongly with items relating to the usability and learnability of the application. The qualitative analysis identified opportunities for improving existing practice, including, improved interpretation/recording measurements; enhanced collaborative practice within the assistive equipment provision process. Future research is needed to determine the clinical utility of this application compared with two-dimensional counterpart paper-based guidance leaflets.
Tips and traps for reapplying used process plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conder, M.W.
1999-07-01
Many gas processing projects are based on reapplying used gas processing plants and equipment. There has been little information or advice in the literature which provides practical advice for this type of project. GPA's Technical Section A Committee has been developing a monograph on experiences in reapplying used plants and equipment. This paper includes excerpts from that monograph and presents advice illustrated by recent experiences with used plants.
30 CFR 206.159 - Determination of processing allowances.
Code of Federal Regulations, 2010 CFR
2010-07-01
... processing contract includes more than one gas plant product and the processing costs attributable to each... the initial depreciable investment in the processing plant multiplied by a rate of return in... for depreciable fixed assets (including costs of delivery and installation of capital equipment) which...
Cost of ownership for inspection equipment
NASA Astrophysics Data System (ADS)
Dance, Daren L.; Bryson, Phil
1993-08-01
Cost of Ownership (CoO) models are increasingly a part of the semiconductor equipment evaluation and selection process. These models enable semiconductor manufacturers and equipment suppliers to quantify a system in terms of dollars per wafer. Because of the complex nature of the semiconductor manufacturing process, there are several key attributes that must be considered in order to accurately reflect the true 'cost of ownership'. While most CoO work to date has been applied to production equipment, the need to understand cost of ownership for inspection and metrology equipment presents unique challenges. Critical parameters such as detection sensitivity as a function of size and type of defect are not included in current CoO models yet are, without question, major factors in the technical evaluation process and life-cycle cost. This paper illustrates the relationship between these parameters, as components of the alpha and beta risk, and cost of ownership.
General RMP Guidance - Appendix D: OSHA Guidance on PSM
OSHA's Process Safety Management (PSM) Guidance on providing complete and accurate written information concerning process chemicals, process technology, and process equipment; including process hazard analysis and material safety data sheets.
Implementation plan for HANDI 2000 TWRS master equipment list
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENNION, S.I.
This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.
ERIC Educational Resources Information Center
Coursen, David
Modern educators and playground designers are increasingly recognizing that play is a part, perhaps the decisive part, of the entire learning process. Theories of playground equipment design, planning the playground, financial considerations, and equipment suggestions are featured in this review. Examples of playgrounds include innovative…
Shelton, Larry R.
1994-01-01
The U.S. Geological Survey's National Water-Quality Assessment program includes extensive data- collection efforts to assess the quality of the Nations's streams. These studies require analyses of stream samples for major ions, nutrients, sediments, and organic contaminants. For the information to be comparable among studies in different parts of the Nation, consistent procedures specifically designed to produce uncontaminated samples for trace analysis in the laboratory are critical. This field guide describes the standard procedures for collecting and processing samples for major ions, nutrients, organic contaminants, sediment, and field analyses of conductivity, pH, alkalinity, and dissolved oxygen. Samples are collected and processed using modified and newly designed equipment made of Teflon to avoid contamination, including nonmetallic samplers (D-77 and DH-81) and a Teflon sample splitter. Field solid-phase extraction procedures developed to process samples for organic constituent analyses produce an extracted sample with stabilized compounds for more accurate results. Improvements to standard operational procedures include the use of processing chambers and capsule filtering systems. A modified collecting and processing procedure for organic carbon is designed to avoid contamination from equipment cleaned with methanol. Quality assurance is maintained by strict collecting and processing procedures, replicate sampling, equipment blank samples, and a rigid cleaning procedure using detergent, hydrochloric acid, and methanol.
Open web system of Virtual labs for nuclear and applied physics
NASA Astrophysics Data System (ADS)
Saldikov, I. S.; Afanasyev, V. V.; Petrov, V. I.; Ternovykh, M. Yu
2017-01-01
An example of virtual lab work on unique experimental equipment is presented. The virtual lab work is software based on a model of real equipment. Virtual labs can be used for educational process in nuclear safety and analysis field. As an example it includes the virtual lab called “Experimental determination of the material parameter depending on the pitch of a uranium-water lattice”. This paper included general description of this lab. A description of a database on the support of laboratory work on unique experimental equipment which is included this work, its concept development are also presented.
2008-10-07
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a worker carries one of the stowage containers into the Multi-Purpose Logistics Module Leonardo for the STS-126 mission to the International Space Station. The 15-day flight will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station Solar Alpha Rotary Joints. Leonardo holds supplies and equipment, including equipment for the regenerative life support system, additional crew quarters and exercise equipment and spare hardware. Photo credit: NASA/Kim Shiflett
2008-10-07
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers place a stowage container in a rack of the Multi-Purpose Logistics Module Leonardo for the STS-126 mission to the International Space Station. The 15-day flight will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station Solar Alpha Rotary Joints. Leonardo holds supplies and equipment, including equipment for the regenerative life support system, additional crew quarters and exercise equipment and spare hardware. Photo credit: NASA/Kim Shiflett
2008-10-07
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers prepare supply packages that will be stowed in the Multi-Purpose Logistics Module Leonardo, at left, for the STS-126 mission to the International Space Station. The 15-day flight will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station Solar Alpha Rotary Joints. Leonardo holds supplies and equipment, including equipment for the regenerative life support system, additional crew quarters and exercise equipment and spare hardware. Photo credit: NASA/Kim Shiflett
2008-10-07
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Multi-Purpose Logistics Module Leonardo is open to receive the final supplies for the STS-126 mission to the International Space Station. The 15-day flight will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station Solar Alpha Rotary Joints. Leonardo holds supplies and equipment, including equipment for the regenerative life support system, additional crew quarters and exercise equipment and spare hardware. Photo credit: NASA/Kim Shiflett
2008-10-07
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers check data sheets associated with stowing supply packages in the Multi-Purpose Logistics Module Leonardo for the STS-126 mission to the International Space Station. The 15-day flight will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station Solar Alpha Rotary Joints. Leonardo holds supplies and equipment, including equipment for the regenerative life support system, additional crew quarters and exercise equipment and spare hardware. Photo credit: NASA/Kim Shiflett
Strategic planning toolset for reproduction of machinebuilding engines and equipment
NASA Astrophysics Data System (ADS)
Boyko, A. A.; Kukartsev, V. V.; Lobkov, K. Y.; Stupina, A. A.
2018-05-01
This article illustrates a replica of a dynamic model of machine-building equipment. The model was designed on the basis of a ‘system dynamics method’ including the Powersim Studio toolset. The given model provides the basis and delineates the reproduction process of equipment in its natural as well as appraisal forms. The presented model was employed as a tool to explore reproduction of a wide range of engines and equipment in machine-building industry. As a result of these experiments, a variety of reproducible options were revealed which include productive capacity and distribution of equipment among technology groups. The authors’ research concludes that the replica of the dynamic model designed by us has proved to be universal. This also opens the way for further research exploring a wide range of industrial equipment reproduction.
Automatic monitoring of vibration welding equipment
Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W
2014-10-14
A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Husler, R.O.; Weir, T.J.
1991-01-01
An enhanced maintenance program is being established to characterize and monitor cables, components, and process response at the Savannah River Site, Defense Waste Processing Facility. This facility was designed and constructed to immobilize the radioactive waste currently stored in underground storage tanks and is expected to begin operation in 1993. The plant is initiating the program to baseline and monitor instrument and control (I C) and electrical equipment, remote process equipment, embedded instrument and control cables, and in-cell jumper cables used in the facility. This program is based on the electronic characterization and diagnostic (ECAD) system which was modified tomore » include process response analysis and to meet rigid Department of Energy equipment requirements. The system consists of computer-automated, state-of-the-art electronics. The data that are gathered are stored in a computerized database for analysis, trending, and troubleshooting. It is anticipated that the data which are gathered and trended will aid in life extension for the facility.« less
Semiautomated, Reproducible Batch Processing of Soy
NASA Technical Reports Server (NTRS)
Thoerne, Mary; Byford, Ivan W.; Chastain, Jack W.; Swango, Beverly E.
2005-01-01
A computer-controlled apparatus processes batches of soybeans into one or more of a variety of food products, under conditions that can be chosen by the user and reproduced from batch to batch. Examples of products include soy milk, tofu, okara (an insoluble protein and fiber byproduct of soy milk), and whey. Most processing steps take place without intervention by the user. This apparatus was developed for use in research on processing of soy. It is also a prototype of other soy-processing apparatuses for research, industrial, and home use. Prior soy-processing equipment includes household devices that automatically produce soy milk but do not automatically produce tofu. The designs of prior soy-processing equipment require users to manually transfer intermediate solid soy products and to press them manually and, hence, under conditions that are not consistent from batch to batch. Prior designs do not afford choices of processing conditions: Users cannot use previously developed soy-processing equipment to investigate the effects of variations of techniques used to produce soy milk (e.g., cold grinding, hot grinding, and pre-cook blanching) and of such process parameters as cooking times and temperatures, grinding times, soaking times and temperatures, rinsing conditions, and sizes of particles generated by grinding. In contrast, the present apparatus is amenable to such investigations. The apparatus (see figure) includes a processing tank and a jacketed holding or coagulation tank. The processing tank can be capped by either of two different heads and can contain either of two different insertable mesh baskets. The first head includes a grinding blade and heating elements. The second head includes an automated press piston. One mesh basket, designated the okara basket, has oblong holes with a size equivalent to about 40 mesh [40 openings per inch (.16 openings per centimeter)]. The second mesh basket, designated the tofu basket, has holes of 70 mesh [70 openings per inch (.28 openings per centimeter)] and is used in conjunction with the press-piston head. Supporting equipment includes a soy-milk heat exchanger for maintaining selected coagulation temperatures, a filter system for separating okara from other particulate matter and from soy milk, two pumps, and various thermocouples, flowmeters, level indicators, pressure sensors, valves, tubes, and sample ports
45 CFR 95.613 - Procurement standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Automatic Data Processing Equipment and Services-Conditions for Federal Financial Participation (FFP... conditions for prior approval. Those standards include a requirement for maximum practical open and free... State or local agency, and the ADP services and equipment acquired by a State or local Central Data...
48 CFR 9905.502-60 - Illustrations.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... For example, the institution may use the number of transactions processed rather than its former... for the same purpose: (1) An educational institution normally allocates special test equipment costs directly to contracts. The costs of general purpose test equipment are normally included in the indirect...
48 CFR 9905.502-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... For example, the institution may use the number of transactions processed rather than its former... for the same purpose: (1) An educational institution normally allocates special test equipment costs directly to contracts. The costs of general purpose test equipment are normally included in the indirect...
48 CFR 9905.502-60 - Illustrations.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... For example, the institution may use the number of transactions processed rather than its former... for the same purpose: (1) An educational institution normally allocates special test equipment costs directly to contracts. The costs of general purpose test equipment are normally included in the indirect...
45 CFR 60.14 - Fees applicable to requests for information.
Code of Federal Regulations, 2011 CFR
2011-10-01
... equipment; (3) Agency management and supervisory costs; (4) Costs of enforcement, research, and establishment of regulations and guidance; (5) Use of electronic data processing equipment to collect and... medical insurance and retirement; (2) Physical overhead, consulting, and other indirect costs including...
7 CFR 1710.106 - Uses of loan funds.
Code of Federal Regulations, 2011 CFR
2011-01-01
... generation facilities to serve RE Act beneficiaries. (3) Warehouse and garage facilities. The purchase, remodeling, or construction of warehouse and garage facilities required for the operation of a borrower's... equipment, including furniture, office, transportation, data processing and other work equipment; and (3...
2008-10-07
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a worker, left, hands off a stowage container to another worker in the Multi-Purpose Logistics Module Leonardo for the STS-126 mission to the International Space Station. The 15-day flight will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station Solar Alpha Rotary Joints. Leonardo holds supplies and equipment, including equipment for the regenerative life support system, additional crew quarters and exercise equipment and spare hardware. Photo credit: NASA/Kim Shiflett
2008-10-07
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a worker, left, checks the manifest regarding the supply packages to be stowed in the Multi-Purpose Logistics Module Leonardo for the STS-126 mission to the International Space Station. The 15-day flight will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station Solar Alpha Rotary Joints. Leonardo holds supplies and equipment, including equipment for the regenerative life support system, additional crew quarters and exercise equipment and spare hardware. Photo credit: NASA/Kim Shiflett
24 CFR 570.202 - Eligible rehabilitation and preservation activities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... replacement of heating and cooling equipment, including the use of solar energy equipment; (5) Improvements to... objectives; (4) Improvements to increase the efficient use of energy in structures through such means as... counseling, energy auditing, preparation of work specifications, loan processing, inspections, and other...
24 CFR 570.202 - Eligible rehabilitation and preservation activities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... replacement of heating and cooling equipment, including the use of solar energy equipment; (5) Improvements to... objectives; (4) Improvements to increase the efficient use of energy in structures through such means as... counseling, energy auditing, preparation of work specifications, loan processing, inspections, and other...
24 CFR 570.202 - Eligible rehabilitation and preservation activities.
Code of Federal Regulations, 2013 CFR
2013-04-01
... replacement of heating and cooling equipment, including the use of solar energy equipment; (5) Improvements to... objectives; (4) Improvements to increase the efficient use of energy in structures through such means as... counseling, energy auditing, preparation of work specifications, loan processing, inspections, and other...
24 CFR 570.202 - Eligible rehabilitation and preservation activities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... replacement of heating and cooling equipment, including the use of solar energy equipment; (5) Improvements to... objectives; (4) Improvements to increase the efficient use of energy in structures through such means as... counseling, energy auditing, preparation of work specifications, loan processing, inspections, and other...
Code of Federal Regulations, 2010 CFR
2010-07-01
... conditioned to produce molten glass. The unit includes foundations, superstructure and retaining walls, raw... aerosols. Malfunction means any sudden failure of air pollution control equipment or process equipment or... melted by indirect heating. The openings of the vessels are in the outside wall of the furnace and are...
Intelligent Processing Equipment Projects at DLA
NASA Technical Reports Server (NTRS)
Obrien, Donald F.
1992-01-01
The Defense Logistics Agency is successfully incorporating Intelligent Processing Equipment (IPE) into each of its Manufacturing Technology thrust areas. Several IPE applications are addressed in the manufacturing of two 'soldier support' items: combat rations and military apparel. In combat rations, in-line sensors for food processing are being developed or modified from other industries. In addition, many process controls are being automated to achieve better quality and to gain higher use (soldier) acceptance. IPE applications in military apparel include: in-process quality controls for identification of sewing defects, use of robots in the manufacture of shirt collars, and automated handling of garments for pressing.
Intelligent processing equipment projects at DLA
NASA Astrophysics Data System (ADS)
Obrien, Donald F.
1992-04-01
The Defense Logistics Agency is successfully incorporating Intelligent Processing Equipment (IPE) into each of its Manufacturing Technology thrust areas. Several IPE applications are addressed in the manufacturing of two 'soldier support' items: combat rations and military apparel. In combat rations, in-line sensors for food processing are being developed or modified from other industries. In addition, many process controls are being automated to achieve better quality and to gain higher use (soldier) acceptance. IPE applications in military apparel include: in-process quality controls for identification of sewing defects, use of robots in the manufacture of shirt collars, and automated handling of garments for pressing.
The market for airline aircraft: A study of process and performance
NASA Technical Reports Server (NTRS)
1976-01-01
The key variables accounting for the nature, timing and magnitude of the equipment and re-equipment cycle are identified and discussed. Forecasts of aircraft purchases by U.S. trunk airlines over the next 10 years are included to examine the anatomy of equipment forecasts in a way that serves to illustrate how certain of these variables or determinants of aircraft demand can be considered in specific terms.
40 CFR 63.1324 - Batch process vents-monitoring equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... device (including but not limited to a thermocouple, ultra-violet beam sensor, or infrared sensor... temperature monitoring device equipped with a continuous recorder is required. (i) Where an incinerator other than a catalytic incinerator is used, the temperature monitoring device shall be installed in the...
The stem cell laboratory: design, equipment, and oversight.
Wesselschmidt, Robin L; Schwartz, Philip H
2011-01-01
This chapter describes some of the major issues to be considered when setting up a laboratory for the culture of human pluripotent stem cells (hPSCs). The process of establishing a hPSC laboratory can be divided into two equally important parts. One is completely administrative and includes developing protocols, seeking approval, and establishing reporting processes and documentation. The other part of establishing a hPSC laboratory involves the physical plant and includes design, equipment and personnel. Proper planning of laboratory operations and proper design of the physical layout of the stem cell laboratory so that meets the scope of planned operations is a major undertaking, but the time spent upfront will pay long-term returns in operational efficiency and effectiveness. A well-planned, organized, and properly equipped laboratory supports research activities by increasing efficiency and reducing lost time and wasted resources.
40 CFR 63.489 - Batch front-end process vents-monitoring equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... device (including, but not limited to, a thermocouple, ultra-violet beam sensor, or infrared sensor... temperature monitoring device equipped with a continuous recorder is required. (i) Where an incinerator other than a catalytic incinerator is used, the temperature monitoring device shall be installed in the...
40 CFR 63.489 - Batch front-end process vents-monitoring equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... device (including, but not limited to, a thermocouple, ultra-violet beam sensor, or infrared sensor... temperature monitoring device equipped with a continuous recorder is required. (i) Where an incinerator other than a catalytic incinerator is used, the temperature monitoring device shall be installed in the...
40 CFR 63.489 - Batch front-end process vents-monitoring equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... device (including, but not limited to, a thermocouple, ultra-violet beam sensor, or infrared sensor... temperature monitoring device equipped with a continuous recorder is required. (i) Where an incinerator other than a catalytic incinerator is used, the temperature monitoring device shall be installed in the...
The Stem Cell Laboratory: Design, Equipment, and Oversight
Wesselschmidt, Robin L.; Schwartz, Philip H.
2013-01-01
This chapter describes some of the major issues to be considered when setting up a laboratory for the culture of human pluripotent stem cells (hPSCs). The process of establishing a hPSC laboratory can be divided into two equally important parts. One is completely administrative and includes developing protocols, seeking approval, and establishing reporting processes and documentation. The other part of establishing a hPSC laboratory involves the physical plant and includes design, equipment and personnel. Proper planning of laboratory operations and proper design of the physical layout of the stem cell laboratory so that meets the scope of planned operations is a major undertaking, but the time spent upfront will pay long-term returns in operational efficiency and effectiveness. A well-planned, organized, and properly equipped laboratory supports research activities by increasing efficiency and reducing lost time and wasted resources. PMID:21822863
Design and optimization of integrated gas/condensate plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Root, C.R.; Wilson, J.L.
1995-11-01
An optimized design is demonstrated for combining gas processing and condensate stabilization plants into a single integrated process facility. This integrated design economically provides improved condensate recovery versus use of a simple stabilizer design. A selection matrix showing likely application of this integrated process is presented for use on future designs. Several methods for developing the fluid characterization and for using a process simulator to predict future design compositions are described, which could be useful in other designs. Optimization of flowsheet equipment choices and of design operating pressures and temperatures is demonstrated including the effect of both continuous and discretemore » process equipment size changes. Several similar designs using a turboexpander to provide refrigeration for liquids recovery and stabilizer reflux are described. Operating overthrust and from the P/15-D platform in the Dutch sector of the North Sea has proven these integrated designs are effective. Concerns do remain around operation near or above the critical pressure that should be addressed in future work including providing conservative separator designs, providing sufficient process design safety margin to meet dew point specifications, selecting the most conservative design values of predicted gas dew point and equipment size calculated with different Equations-of-State, and possibly improving the accuracy of PVT calculations in the near critical area.« less
Use of a Modern Polymerization Pilot-Plant for Undergraduate Control Projects.
ERIC Educational Resources Information Center
Mendoza-Bustos, S. A.; And Others
1991-01-01
Described is a project where students gain experience in handling large volumes of hazardous materials, process start up and shut down, equipment failures, operational variations, scaling up, equipment cleaning, and run-time scheduling while working in a modern pilot plant. Included are the system design, experimental procedures, and results. (KR)
40 CFR 63.1363 - Standards for equipment leaks.
Code of Federal Regulations, 2010 CFR
2010-07-01
... mechanical seal system that includes a barrier fluid system and meets the requirements specified in... dual mechanical seal system is: (A) Operated with the barrier fluid at a pressure that is at all times... paragraph (a)(2) of this section. (5) Lines and equipment not containing process fluids are not subject to...
The interplanetary Pioneers. Volume 2: System design and development
NASA Technical Reports Server (NTRS)
Corliss, W. R.
1972-01-01
The Pioneer systems, subsystems, and ground support activities are described. Details are given on the launch trajectory and solar orbit plans, spacecraft design approach and evolution, scientific instrument, test and ground support equipment, Delta launch vehicle, tracking and communication, and data processing equipment. Pioneer specifications, and reliability and quality assurance are also included.
Apparatus Circulates Sterilizing Gas
NASA Technical Reports Server (NTRS)
Cross, John H.; Schwarz, Ray P.
1991-01-01
Apparatus circulates sterilizing gas containing ethylene oxide and chlorofluorocarbon through laboratory or medical equipment. Confines sterilizing gas, circulating it only through parts to be treated. Consists of two units. One delivers ethylene oxide/chlorofluorocarbon gas mixture and removes gas after treatment. Other warms, humidifies, and circulates gas through equipment to be treated. Process provides reliable sterilization with negligible residual toxicity from ethylene oxide. Particularly suitable for sterilization of interiors of bioreactors, heart/lung machines, dialyzers, or other equipment including complicated tubing.
40 CFR 60.2558 - What if a chemical recovery unit is not listed in § 60.2555(n)?
Code of Federal Regulations, 2010 CFR
2010-07-01
... process flow diagram) of the process in which the materials are burned, highlighting the type, design, and operation of the equipment used in this process. (4) A description (including a process flow diagram) of the...
40 CFR 60.2558 - What if a chemical recovery unit is not listed in § 60.2555(n)?
Code of Federal Regulations, 2011 CFR
2011-07-01
... process flow diagram) of the process in which the materials are burned, highlighting the type, design, and operation of the equipment used in this process. (4) A description (including a process flow diagram) of the...
Planning for the semiconductor manufacturer of the future
NASA Technical Reports Server (NTRS)
Fargher, Hugh E.; Smith, Richard A.
1992-01-01
Texas Instruments (TI) is currently contracted by the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST, including the following: new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication. TI was awarded the contract in Oct., 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include the following: process control for dynamic control of factory processes; modular processing system for controlling the processing equipment; generic equipment model which provides an interface between processing equipment and the rest of the factory; specification system which maintains factory documents and product specifications; simulator for modelling the factory for analysis purposes; scheduler for scheduling work on the factory floor; and the planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the planner, scheduler, and simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.
40 CFR 63.3310 - What definitions are used in this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... organic HAP emissions generated by a process that is delivered to a control device, expressed as a... non-woven material made of filaments, fibers, or yarns including thread. This term includes material... into new processes and products where such equipment is operated under the close supervision of...
40 CFR 63.3310 - What definitions are used in this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... organic HAP emissions generated by a process that is delivered to a control device, expressed as a... non-woven material made of filaments, fibers, or yarns including thread. This term includes material... into new processes and products where such equipment is operated under the close supervision of...
40 CFR 63.3310 - What definitions are used in this subpart?
Code of Federal Regulations, 2010 CFR
2010-07-01
... organic HAP emissions generated by a process that is delivered to a control device, expressed as a... non-woven material made of filaments, fibers, or yarns including thread. This term includes material... into new processes and products where such equipment is operated under the close supervision of...
40 CFR 63.3310 - What definitions are used in this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... organic HAP emissions generated by a process that is delivered to a control device, expressed as a... non-woven material made of filaments, fibers, or yarns including thread. This term includes material... into new processes and products where such equipment is operated under the close supervision of...
40 CFR 63.3310 - What definitions are used in this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... organic HAP emissions generated by a process that is delivered to a control device, expressed as a... non-woven material made of filaments, fibers, or yarns including thread. This term includes material... into new processes and products where such equipment is operated under the close supervision of...
Interactive data-processing system for metallurgy
NASA Technical Reports Server (NTRS)
Rathz, T. J.
1978-01-01
Equipment indicates that system can rapidly and accurately process metallurgical and materials-processing data for wide range of applications. Advantages include increase in contract between areas on image, ability to analyze images via operator-written programs, and space available for storing images.
NASA Technical Reports Server (NTRS)
Goldman, H.; Wolf, M.
1979-01-01
The manufacturing methods for photovoltaic solar energy utilization are assessed. Economic and technical data on the current front junction formation processes of gaseous diffusion and ion implantation are presented. Future proposals, including modifying gaseous diffusion and using ion implantation, to decrease the cost of junction formation are studied. Technology developments in current processes and an economic evaluation of the processes are included.
A Review of International Space Station Habitable Element Equipment Offgassing Characteristics
NASA Technical Reports Server (NTRS)
Perry, Jay L.
2010-01-01
Crewed spacecraft trace contaminant control employs both passive and active methods to achieve acceptable cabin atmospheric quality. Passive methods include carefully selecting materials of construction, employing clean manufacturing practices, and minimizing systems and payload operational impacts to the cabin environment. Materials selection and manufacturing processes constitute the first level of equipment offgassing control. An element-level equipment offgassing test provides preflight verification that passive controls have been successful. Offgassing test results from multiple International Space Station (ISS) habitable elements and cargo vehicles are summarized and implications for active contamination control equipment design are discussed
Indigenous lunar construction materials
NASA Technical Reports Server (NTRS)
Rogers, Wayne; Sture, Stein
1991-01-01
The objectives are the following: to investigate the feasibility of the use of local lunar resources for construction of a lunar base structure; to develop a material processing method and integrate the method with design and construction of a pressurized habitation structure; to estimate specifications of the support equipment necessary for material processing and construction; and to provide parameters for systems models of lunar base constructions, supply, and operations. The topics are presented in viewgraph form and include the following: comparison of various lunar structures; guidelines for material processing methods; cast lunar regolith; examples of cast basalt components; cast regolith process; processing equipment; mechanical properties of cast basalt; material properties and structural design; and future work.
Massambu, Charles; Mwangi, Christina
2009-06-01
The rapid scale-up of the care and treatment programs in Tanzania during the preceding 4 years has greatly increased the demand for quality laboratory services for diagnosis of HIV and monitoring patients during antiretroviral therapy. Laboratory services were not in a position to cope with this demand owing to poor infrastructure, lack of human resources, erratic and/or lack of reagent supply and commodities, and slow manual technologies. With the limited human resources in the laboratory and the need for scaling up the care and treatment program, it became necessary to install automated equipment and train personnel for the increased volume of testing and new tests across all laboratory levels. With the numerous partners procuring equipment, the possibility of a multitude of equipment platforms with attendant challenges for procurement of reagents, maintenance of equipment, and quality assurance arose. Tanzania, therefore, had to harmonize laboratory tests and standardize laboratory equipment at different levels of the laboratory network. The process of harmonization of tests and standardization of equipment included assessment of laboratories, review of guidelines, development of a national laboratory operational plan, and stakeholder advocacy. This document outlines this process.
NASA Astrophysics Data System (ADS)
Brady, M. P.; Keiser, J. R.; Leonard, D. N.; Whitmer, L.; Thomson, J. K.
2014-12-01
Thermochemical liquefaction processing of biomass to produce bio-derived fuels (e.g., gasoline, jet fuel, diesel, home heating oil, etc.) is of great recent interest as a renewable energy source. Approaches under investigation include direct liquefaction, hydrothermal liquefaction, hydropyrolysis, fast pyrolysis, etc., to produce energy dense liquids that can be utilized as produced or further processed to provide products of higher value. An issue with bio-oils is that they tend to contain significant concentrations of organic oxygenates, including acids, which make the bio-oil a potential source of corrosion issues in transport, storage, and use. Efforts devoted to modified/further processing of bio-oils to make them less corrosive are currently being widely pursued. Another issue that must also be addressed in bio-oil liquefaction is potential corrosion issues in the process equipment. Depending on the specific process, bio-oil liquefaction production temperatures are typically in the 300-600°C range, and the process environment can contain aggressive sulfur and halide species from both the biomass used and/or process additives. Detailed knowledge of the corrosion resistance of candidate process equipment alloys in these bio-oil production environments is currently lacking. This paper summarizes recent, ongoing efforts to assess the extent of corrosion of bio-oil process equipment, with the ultimate goal of providing a basis for the selection of the lowest cost alloy grades capable of providing the long-term corrosion resistance needed for future bio-oil production plants.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-05
... exposure control, image processing and reconstruction programs, patient and equipment supports, component..., acquisition workstation, automatic exposure control, image processing and reconstruction programs, patient and... may include was revised by adding automatic exposure control, image processing and reconstruction...
NASA Astrophysics Data System (ADS)
Aprilia, Ayu Rizky; Santoso, Imam; Ekasari, Dhita Murita
2017-05-01
Yogurt is a product based on milk, which has beneficial effects for health. The process for the production of yogurt is very susceptible to failure because it involves bacteria and fermentation. For an industry, the risks may cause harm and have a negative impact. In order for a product to be successful and profitable, it requires the analysis of risks that may occur during the production process. Risk analysis can identify the risks in detail and prevent as well as determine its handling, so that the risks can be minimized. Therefore, this study will analyze the risks of the production process with a case study in CV.XYZ. The method used in this research is the Fuzzy Failure Mode and Effect Analysis (fuzzy FMEA) and Fault Tree Analysis (FTA). The results showed that there are 6 risks from equipment variables, raw material variables, and process variables. Those risks include the critical risk, which is the risk of a lack of an aseptic process, more specifically if starter yogurt is damaged due to contamination by fungus or other bacteria and a lack of sanitation equipment. The results of quantitative analysis of FTA showed that the highest probability is the probability of the lack of an aseptic process, with a risk of 3.902%. The recommendations for improvement include establishing SOPs (Standard Operating Procedures), which include the process, workers, and environment, controlling the starter of yogurt and improving the production planning and sanitation equipment using hot water immersion.
Small Column Ion Exchange Design and Safety Strategy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huff, T.; Rios-Armstrong, M.; Edwards, R.
2011-02-07
Small Column Ion Exchange (SCIX) is a transformational technology originally developed by the Department of Energy (DOE) Environmental Management (EM-30) office and is now being deployed at the Savannah River Site (SRS) to significantly increase overall salt processing capacity and accelerate the Liquid Waste System life-cycle. The process combines strontium and actinide removal using Monosodium Titanate (MST), Rotary Microfiltration, and cesium removal using Crystalline Silicotitanate (CST, specifically UOP IONSIV{reg_sign}IE-911 ion exchanger) to create a low level waste stream to be disposed in grout and a high level waste stream to be vitrified. The process also includes preparation of the streamsmore » for disposal, e.g., grinding of the loaded CST material. These waste processing components are technically mature and flowsheet integration studies are being performed including glass formulations studies, application specific thermal modeling, and mixing studies. The deployment program includes design and fabrication of the Rotary Microfilter (RMF) assembly, ion-exchange columns (IXCs), and grinder module, utilizing an integrated system safety design approach. The design concept is to install the process inside an existing waste tank, Tank 41H. The process consists of a feed pump with a set of four RMFs, two IXCs, a media grinder, three Submersible Mixer Pumps (SMPs), and all supporting infrastructure including media receipt and preparation facilities. The design addresses MST mixing to achieve the required strontium and actinide removal and to prevent future retrieval problems. CST achieves very high cesium loadings (up to 1,100 curies per gallon (Ci/gal) bed volume). The design addresses the hazards associated with this material including heat management (in column and in-tank), as detailed in the thermal modeling. The CST must be size reduced for compatibility with downstream processes. The design addresses material transport into and out of the grinder and includes provisions for equipment maintenance including remote handling. The design includes a robust set of nuclear safety controls compliant with DOE Standard (STD)-1189, Integration of Safety into the Design Process. The controls cover explosions, spills, boiling, aerosolization, and criticality. Natural Phenomena Hazards (NPH) including seismic event, tornado/high wind, and wildland fire are considered. In addition, the SCIX process equipment was evaluated for impact to existing facility safety equipment including the waste tank itself. SCIX is an innovative program which leverages DOE's technology development capabilities to provide a basis for a successful field deployment.« less
A manual for inexpensive methods of analyzing and utilizing remote sensor data
NASA Technical Reports Server (NTRS)
Elifrits, C. D.; Barr, D. J.
1978-01-01
Instructions are provided for inexpensive methods of using remote sensor data to assist in the completion of the need to observe the earth's surface. When possible, relative costs were included. Equipment need for analysis of remote sensor data is described, and methods of use of these equipment items are included, as well as advantages and disadvantages of the use of individual items. Interpretation and analysis of stereo photos and the interpretation of typical patterns such as tone and texture, landcover, drainage, and erosional form are described. Similar treatment is given to monoscopic image interpretation, including LANDSAT MSS data. Enhancement techniques are detailed with respect to their application and simple techniques of creating an enhanced data item. Techniques described include additive and subtractive (Diazo processes) color techniques and enlargement of photos or images. Applications of these processes, including mappings of land resources, engineering soils, geology, water resources, environmental conditions, and crops and/or vegetation, are outlined.
Sensitivity analysis of the add-on price estimate for the edge-defined film-fed growth process
NASA Technical Reports Server (NTRS)
Mokashi, A. R.; Kachare, A. H.
1981-01-01
The analysis is in terms of cost parameters and production parameters. The cost parameters include equipment, space, direct labor, materials, and utilities. The production parameters include growth rate, process yield, and duty cycle. A computer program was developed specifically to do the sensitivity analysis.
40 CFR 63.1082 - What definitions do I need to know?
Code of Federal Regulations, 2011 CFR
2011-07-01
... includes direct-contact cooling water. Spent caustic waste stream means the continuously flowing process... compounds from process streams, typically cracked gas. The spent caustic waste stream does not include spent..., and the C4 butadiene storage equipment; and spent wash water from the C4 crude butadiene carbonyl wash...
40 CFR 63.1082 - What definitions do I need to know?
Code of Federal Regulations, 2012 CFR
2012-07-01
... includes direct-contact cooling water. Spent caustic waste stream means the continuously flowing process... compounds from process streams, typically cracked gas. The spent caustic waste stream does not include spent..., and the C4 butadiene storage equipment; and spent wash water from the C4 crude butadiene carbonyl wash...
40 CFR 63.1082 - What definitions do I need to know?
Code of Federal Regulations, 2014 CFR
2014-07-01
... includes direct-contact cooling water. Spent caustic waste stream means the continuously flowing process... compounds from process streams, typically cracked gas. The spent caustic waste stream does not include spent..., and the C4 butadiene storage equipment; and spent wash water from the C4 crude butadiene carbonyl wash...
40 CFR 63.1082 - What definitions do I need to know?
Code of Federal Regulations, 2013 CFR
2013-07-01
... includes direct-contact cooling water. Spent caustic waste stream means the continuously flowing process... compounds from process streams, typically cracked gas. The spent caustic waste stream does not include spent..., and the C4 butadiene storage equipment; and spent wash water from the C4 crude butadiene carbonyl wash...
Developing a Logistics Data Process for Support Equipment for NASA Ground Operations
NASA Technical Reports Server (NTRS)
Chakrabarti, Suman
2010-01-01
The United States NASA Space Shuttle has long been considered an extremely capable yet relatively expensive rocket. A great part of the roughly US $500 million per launch expense was the support footprint: refurbishment and maintenance of the space shuttle system, together with the long list of resources required to support it, including personnel, tools, facilities, transport and support equipment. NASA determined to make its next rocket system with a smaller logistics footprint, and thereby more cost-effective and quicker turnaround. The logical solution was to adopt a standard Logistics Support Analysis (LSA) process based on GEIA-STD-0007 http://www.logisticsengineers.org/may09pres/GEIASTD0007DEXShortIntro.pdf which is the successor of MIL-STD-1388-2B widely used by U.S., NATO, and other world military services and industries. This approach is unprecedented at NASA: it is the first time a major program of programs, Project Constellation, is factoring logistics and supportability into design at many levels. This paper will focus on one of those levels NASA ground support equipment for the next generation of NASA rockets and on building a Logistics Support Analysis Record (LSAR) for developing and documenting a support solution and inventory of resources for. This LSAR is actually a standards-based database, containing analyses of the time and tools, personnel, facilities and support equipment required to assemble and integrate the stages and umbilicals of a rocket. This paper will cover building this database from scratch: including creating and importing a hierarchical bill of materials (BOM) from legacy data; identifying line-replaceable units (LRUs) of a given piece of equipment; analyzing reliability and maintainability of said LRUs; and therefore making an assessment back to design whether the support solution for a piece of equipment is too much work, i.e., too resource-intensive. If one must replace or inspect an LRU too much, perhaps a modification of the design of the equipment can make such operational effort unnecessary. Finally, this paper addresses processes of tying resources to a timeline of tasks performed in ground operations: this enables various overarching analyses, e.g., a summarization of all resources used for a given piece of equipment. Quality Control of data will also be discussed: importing and exporting data from product teams, including spreadsheets-todatabase or data exchange between databases.
NASA Technical Reports Server (NTRS)
1978-01-01
Alternate ground processing options are summarized, including installation and test requirements for payloads, space processing, combined astronomy, and life sciences. The level 4 integration resource requirements are also reviewed for: personnel, temporary relocation, transportation, ground support equipment, and Spacelab flight hardware.
SU-E-J-189: Credentialing of IGRT Equipment and Processes for Clinical Trials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Court, L; Aristophanous, M; Followill, D
2014-06-01
Purpose: Current dosimetry phantoms used for clinical trial credentialing do not directly assess IGRT processes. This work evaluates a custom-built IGRT phantom for credentialing of multiple IGRT modalities and processes. Methods: An IGRT phantom was built out of a low-density body with two inserts. Insert A is used for the CT simulation. Insert B is used for the actual treatment. The inserts contain identical targets in different locations. Relative positions are unknown to the user. The user simulates the phantom (with insert A) as they would a patient, including marking the phantom. A treatment plan is created and sent tomore » the treatment unit. The phantom (with insert B) is then positioned using local IGRT practice. Shifts (planned isocenter, if applicable, and final isocenter) are marked on the phantom using room lasers. The mechanical reproducibility of re-inserting the inserts within the phantom body was tested using repeat high-resolution CT scans. The phantom was tested at 7 centers, selected to include a wide variety of imaging equipment. Results: Mechanical reproducibility was measured as 0.5-0.9mm, depending on the direction. Approaches tested to mark (and transfer) simulation isocenter included lasers, fiducials and reflective markers. IGRT approaches included kV imaging (Varian Trilogy, Brainlab ExacTrac), kV CT (CT-on-rails), kV CBCT (Varian Trilogy, Varian Truebeam, Elekta Agility) and MV CT (Tomotherapy). Users were able to successfully use this phantom for all combinations of equipment and processes. IGRT-based shifts agreed with the truth within 0.8mm, 0.8mm and 1.9mm in the LR, AP, and SI directions, respectively. Conclusion: Based on these preliminary results, the IGRT phantom can be used for credentialing of clinical trials with an action level of 1mm in AP and LR directions, and 2mm in the SI direction, consistent with TG142. We are currently testing with additional institutions with different equipment and processes, including Cyberknife. This project was funded by the Cancer Prevention Research Institute of Texas.« less
Decontamination of metals using chemical etching
Lerch, Ronald E.; Partridge, Jerry A.
1980-01-01
The invention relates to chemical etching process for reclaiming contaminated equipment wherein a reduction-oxidation system is included in a solution of nitric acid to contact the metal to be decontaminated and effect reduction of the reduction-oxidation system, and includes disposing a pair of electrodes in the reduced solution to permit passage of an electrical current between said electrodes and effect oxidation of the reduction-oxidation system to thereby regenerate the solution and provide decontaminated equipment that is essentially radioactive contamination-free.
NASA Technical Reports Server (NTRS)
Miller, R. H.; Smith, D. B. S.
1979-01-01
Production and support equipment specifications are described for the space manufacturing facility (SMF). Defined production equipment includes electromagnetic pumps for liquid metal, metal alloying furnaces, die casters, electron beam welders and cutters, glass forming for structural elements, and rolling. A cost analysis is presented which includes the development, the aquisition of all SMF elements, initial operating cost, maintenance and logistics cost, cost of terrestrial materials, and transportation cost for each major element. Computer program listings and outputs are appended.
[Experience of importation of equipment for research in the ELSA-Brasil].
Almeida, Cristiana Paula Matos de; Aquino, Estela M L; Mota, Eduardo L A; Mota, Fábio Batista; Braga, Valéria Cerqueira Campos; Ladeira, Roberto Marini; Silva, Gabriela Feiden; Souza, Angelita Gomes de; Oliveira, Rosalba
2013-06-01
Policies that promote research in health were established in the last decade, developing the Brazilian scientific production. This development has not been accompanied by an improvement in the legal-institutional framework, thus hindering the development of research projects, including equipment importation activities. The present study aimed to analyze the equipment importation process for the Brazilian Longitudinal Study for Adult Health (ELSA-Brasil). A case study was performed with data collected from internal ELSA-Brasil documents in five Investigation Centers and their respective supporting foundations. The following importation documents were analyzed: pulse wave velocity, bioimaging and retinography. Additionally, non-structured interviews with researchers and key informers were conducted in the foundations. Data were treated and organized into three stages: administrative-operational, exchange rate, and fiscal. Lengths of duration of these stages were calculated comparatively among centers. The need to standardize equipment in a multicenter study required a joint action of implementing institutions and foundations. Of all pieces of equipment analyzed, the first stage was administrative-operational, with a varying duration (minimum of eight, maximum of 101, and mean of 55 days) which was longer when legal opinions were included. The second stage was the exchange rate, which was longer than the former and did not pose any obstacles to the process (minimum of 11, maximum of 381, and mean of 196 days). The third stage was fiscal, which was the longest one (minimum of 43, maximum of 388, and mean of 215.5 days), due to the release of equipment without registration into the country. There were other factors that posed obstacles: inexperience of investigation centers and institutions in networking; inadequacy of the national legislation on scientific research particularities; and the lack of specialized professionals in scientific project management. The results show the slowness of the equipment importation process in Brazil, especially due to legal, bureaucratic and managerial obstacles.
2008-10-15
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers prepare equipment to be used closing the hatch on the Multi-Purpose Logistics Module Leonardo. The module is the payload for space shuttle Endeavour's STS-126 mission to the International Space Station. The 15-day mission will deliver equipment and supplies to the space station in preparation for expansion from a three- to six-person resident crew aboard the complex. Leonardo holds supplies and equipment, including additional crew quarters, equipment for the regenerative life support system and spare hardware. Endeavour is targeted for launch Nov. 14. Photo credit: NASA/Jim Grossmann
[Medical Equipment Maintenance Methods].
Liu, Hongbin
2015-09-01
Due to the high technology and the complexity of medical equipment, as well as to the safety and effectiveness, it determines the high requirements of the medical equipment maintenance work. This paper introduces some basic methods of medical instrument maintenance, including fault tree analysis, node method and exclusive method which are the three important methods in the medical equipment maintenance, through using these three methods for the instruments that have circuit drawings, hardware breakdown maintenance can be done easily. And this paper introduces the processing methods of some special fault conditions, in order to reduce little detours in meeting the same problems. Learning is very important for stuff just engaged in this area.
NASA Technical Reports Server (NTRS)
Miller, L.
1980-01-01
A facility which produces electrodes for spacecraft power supplies is described. The electrode assembly procedures are discussed. A number of design features in the production process are reported including a batch operation mode and an independent equipment module design approach for transfering the electrode materials from process tank to process tank.
2004-01-22
KENNEDY SPACE CENTER, FLA. - A worker in the Orbiter Processing Facility checks the open hatch of the airlock in Discovery’s payload bay. The airlock is normally located inside the middeck of the spacecraft’s pressurized crew cabin. The airlock is sized to accommodate two fully suited flight crew members simultaneously. Support functions include airlock depressurization and repressurization, extravehicular activity equipment recharge, liquid-cooled garment water cooling, EVA equipment checkout, donning and communications. The outer hatch isolates the airlock from the unpressurized payload bay when closed and permits the EVA crew members to exit from the airlock to the payload bay when open.
40 CFR 418.11 - Specialized definitions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... STANDARDS FERTILIZER MANUFACTURING POINT SOURCE CATEGORY Phosphate Subcategory § 418.11 Specialized... including precipitation runoff which, during manufacturing or processing, comes into incidental contact with...) Precipitation runoff; (2) accidental spills; (3) accidental leaks caused by the failure of process equipment and...
40 CFR 418.11 - Specialized definitions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... STANDARDS FERTILIZER MANUFACTURING POINT SOURCE CATEGORY Phosphate Subcategory § 418.11 Specialized... including precipitation runoff which, during manufacturing or processing, comes into incidental contact with...) Precipitation runoff; (2) accidental spills; (3) accidental leaks caused by the failure of process equipment and...
40 CFR 418.11 - Specialized definitions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... STANDARDS FERTILIZER MANUFACTURING POINT SOURCE CATEGORY Phosphate Subcategory § 418.11 Specialized... including precipitation runoff which, during manufacturing or processing, comes into incidental contact with...) Precipitation runoff; (2) accidental spills; (3) accidental leaks caused by the failure of process equipment and...
NASA Technical Reports Server (NTRS)
1978-01-01
The techniques, processes, and equipment required for automatic fabrication and assembly of structural elements in space using the space shuttle as a launch vehicle and construction base were investigated. Additional construction/systems/operational techniques, processes, and equipment which can be developed/demonstrated in the same program to provide further risk reduction benefits to future large space systems were included. Results in the areas of structure/materials, fabrication systems (beam builder, assembly jig, and avionics/controls), mission integration, and programmatics are summarized. Conclusions and recommendations are given.
Ground Handling of Batteries at Test and Launch-site Facilities
NASA Technical Reports Server (NTRS)
Jeevarajan, Judith A.; Hohl, Alan R.
2008-01-01
Ground handling of flight as well as engineering batteries at test facilities and launch-site facilities is a safety critical process. Test equipment interfacing with the batteries should have the required controls to prevent a hazardous failure of the batteries. Test equipment failures should not induce catastrophic failures on the batteries. Transportation requirements for batteries should also be taken into consideration for safe transportation. This viewgraph presentation includes information on the safe handling of batteries for ground processing at test facilities as well as launch-site facilities.
Manufacturing engineering: Principles for optimization
NASA Astrophysics Data System (ADS)
Koenig, Daniel T.
Various subjects in the area of manufacturing engineering are addressed. The topics considered include: manufacturing engineering organization concepts and management techniques, factory capacity and loading techniques, capital equipment programs, machine tool and equipment selection and implementation, producibility engineering, methods, planning and work management, and process control engineering in job shops. Also discussed are: maintenance engineering, numerical control of machine tools, fundamentals of computer-aided design/computer-aided manufacture, computer-aided process planning and data collection, group technology basis for plant layout, environmental control and safety, and the Integrated Productivity Improvement Program.
Guidance on including ITS elements in transportation projects
DOT National Transportation Integrated Search
2001-01-01
The purpose of this document is to provide guidance for including ITS equipment and technologies as part of traditional transportation construction or maintenance projects. This document is not intended to simplify the planning process, rather it is ...
Code of Federal Regulations, 2011 CFR
2011-01-01
... includes furniture and equipment, leasehold improvements, and capitalized start-up costs. Data communication means transmitting and receiving of data to or from Banks, Federal Reserve offices, clearinghouse... for delivery of information; and telephone inquiry service. Data processing includes capture, storage...
Code of Federal Regulations, 2013 CFR
2013-01-01
... includes furniture and equipment, leasehold improvements, and capitalized start-up costs. Data communication means transmitting and receiving of data to or from Banks, Federal Reserve offices, clearinghouse... for delivery of information; and telephone inquiry service. Data processing includes capture, storage...
Code of Federal Regulations, 2010 CFR
2010-01-01
... includes furniture and equipment, leasehold improvements, and capitalized start-up costs. Data communication means transmitting and receiving of data to or from Banks, Federal Reserve offices, clearinghouse... for delivery of information; and telephone inquiry service. Data processing includes capture, storage...
Code of Federal Regulations, 2012 CFR
2012-01-01
... includes furniture and equipment, leasehold improvements, and capitalized start-up costs. Data communication means transmitting and receiving of data to or from Banks, Federal Reserve offices, clearinghouse... for delivery of information; and telephone inquiry service. Data processing includes capture, storage...
TDRSS S-shuttle unique receiver equipment
NASA Astrophysics Data System (ADS)
Weinberg, A.; Schwartz, J. J.; Spearing, R.
1985-01-01
Beginning with STS-9, the Tracking and Date Relay Satellite system (TDRSS) will start providing S- and Ku-band communications and tracking support to the Space Shuttle and its payloads. The most significant element of this support takes place at the TDRSS White Sands Ground Terminal, which processes the Shuttle return link S- and Ku-band signals. While Ku-band hardware available to other TDRSS users is also applied to Ku-Shuttle, stringent S-Shuttle link margins have precluded the application of the standard TDRSS S-band processing equipment to S-Shuttle. It was therfore found necessary to develop a unique S-Shuttle Receiver that embodies state-of-the-art digital technology and processing techniques. This receiver, developed by Motorola, Inc., enhances link margins by 1.5 dB relative to the standard S-band equipment and its bit error rate performance is within a few tenths of a dB of theory. An overview description of the Space Shuttle Receiver Equipment (SSRE) is presented which includes the presentation of block diagrams and salient design features. Selected, measured performance results are also presented.
Silicon production process evaluations
NASA Technical Reports Server (NTRS)
1981-01-01
Chemical engineering analysis of the HSC process (Hemlock Semiconductor Corporation) for producing silicon from dichlorosilane in a 1,000 MT/yr plant was continued. Progress and status for the chemical engineering analysis of the HSC process are reported for the primary process design engineering activities: base case conditions (85%), reaction chemistry (85%), process flow diagram (60%), material balance (60%), energy balance (30%), property data (30%), equipment design (20%) and major equipment list (10%). Engineering design of the initial distillation column (D-01, stripper column) in the process was initiated. The function of the distillation column is to remove volatile gases (such as hydrogen and nitrogen) which are dissolved in liquid chlorosilanes. Initial specifications and results for the distillation column design are reported including the variation of tray requirements (equilibrium stages) with reflux ratio for the distillation.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., transcribed or graphic matter including letters, telegrams, memoranda, reports, studies, forecasts, lists... conversations or communications; and (2) all information contained in data processing equipment or materials...
76 FR 72902 - Materials Processing Equipment Technical Advisory Committee;
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-28
... DEPARTMENT OF COMMERCE Bureau of Industry and Security Materials Processing Equipment Technical Advisory Committee; Notice of Partially Closed Meeting The Materials Processing Equipment Technical... questions that affect the level of export controls applicable to materials processing equipment and related...
Criteria for Determining whether Equipment is Air Pollution Control Equipment or Process Equipment
This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Bidirectional power converter control electronics
NASA Technical Reports Server (NTRS)
Mildice, J. W.
1987-01-01
The object of this program was to design, build, test, and deliver a set of control electronics suitable for control of bidirectional resonant power processing equipment of the direct output type. The program is described, including the technical background, and results discussed. Even though the initial program tested only the logic outputs, the hardware was subsequently tested with high-power breadboard equipment, and in the testbed of NASA contract NAS3-24399. The completed equipment is now operating as part of the Space Station Power System Test Facility at NASA Lewis Research Center.
ELECTRONIC BUSINESS DATA PROCESSING PERIPHERAL EQUIPMENT OCCUPATIONS, SUGGESTED CURRICULA.
ERIC Educational Resources Information Center
Office of Education (DHEW), Washington, DC.
VOCATIONAL CURRICULUMS ARE SUGGESTED FOR EIGHT ELECTRONIC BUSINESS DATA PROCESSING OCCUPATIONS AS A GUIDE TO TRAINING UNEMPLOYED AND UNDEREMPLOYED PERSONS. THE COURSE OUTLINES AND OTHER MATERIAL WERE PREPARED BY STAFF MEMBERS OF THE INFORMATION AND TRAINING SERVICES DIVISION OF MCGRAW-HILL, INC. CONSULTANTS INCLUDED DATA PROCESSING TRAINING…
Page, Trevor; Dubina, Henry; Fillipi, Gabriele; Guidat, Roland; Patnaik, Saroj; Poechlauer, Peter; Shering, Phil; Guinn, Martin; Mcdonnell, Peter; Johnston, Craig
2015-03-01
This white paper focuses on equipment, and analytical manufacturers' perspectives, regarding the challenges of continuous pharmaceutical manufacturing across five prompt questions. In addition to valued input from several vendors, commentary was provided from experienced pharmaceutical representatives, who have installed various continuous platforms. Additionally, a small medium enterprise (SME) perspective was obtained through interviews. A range of technical challenges is outlined, including: the presence of particles, equipment scalability, fouling (and cleaning), technology derisking, specific analytical challenges, and the general requirement of improved technical training. Equipment and analytical companies can make a significant contribution to help the introduction of continuous technology. A key point is that many of these challenges exist in batch processing and are not specific to continuous processing. Backward compatibility of software is not a continuous issue per se. In many cases, there is available learning from other industries. Business models and opportunities through outsourced development partners are also highlighted. Agile smaller companies and academic groups have a key role to play in developing skills, working collaboratively in partnerships, and focusing on solving relevant industry challenges. The precompetitive space differs for vendor companies compared with large pharmaceuticals. Currently, there is no strong consensus around a dominant continuous design, partly because of business dynamics and commercial interests. A more structured common approach to process design and hardware and software standardization would be beneficial, with initial practical steps in modeling. Conclusions include a digestible systems approach, accessible and published business cases, and increased user, academic, and supplier collaboration. This mirrors US FDA direction. The concept of silos in pharmaceutical companies is a common theme throughout the white papers. In the equipment domain, this is equally prevalent among a broad range of companies, mainly focusing on discrete areas. As an example, the flow chemistry and secondary drug product communities are almost entirely disconnected. Control and Process Analytical Technologies (PAT) companies are active in both domains. The equipment actors are a very diverse group with a few major Original Equipment Manufacturers (OEM) players and a variety of SME, project providers, integrators, upstream downstream providers, and specialist PAT. In some cases, partnerships or alliances are formed to increase critical mass. This white paper has focused on small molecules; equipment associated with biopharmaceuticals is covered in a separate white paper. More specifics on equipment detail are provided in final dosage form and drug substance white papers. The equipment and analytical development from laboratory to pilot to production is important, with a variety of sensors and complexity reducing with scale. The importance of robust processing rather than overcomplex control strategy mitigation is important. A search of nonacademic literature highlights, with a few notable exceptions, a relative paucity of material. Much focuses on the economics and benefits of continuous, rather than specifics of equipment issues. The disruptive nature of continuous manufacturing represents either an opportunity or a threat for many companies, so the incentive to change equipment varies. Also, for many companies, the pharmaceutical sector is not actually the dominant sector in terms of sales. © 2014 Wiley Periodicals, Inc. and the American Pharmacists Association. © 2014 Wiley Periodicals, Inc. and the American Pharmacists Association.
Page, Trevor; Dubina, Henry; Fillipi, Gabriele; Guidat, Roland; Patnaik, Saroj; Poechlauer, Peter; Shering, Phil; Guinn, Martin; Mcdonnell, Peter; Johnston, Craig
2015-03-01
This white paper focuses on equipment, and analytical manufacturers' perspectives, regarding the challenges of continuous pharmaceutical manufacturing across five prompt questions. In addition to valued input from several vendors, commentary was provided from experienced pharmaceutical representatives, who have installed various continuous platforms. Additionally, a small medium enterprise (SME) perspective was obtained through interviews. A range of technical challenges is outlined, including: the presence of particles, equipment scalability, fouling (and cleaning), technology derisking, specific analytical challenges, and the general requirement of improved technical training. Equipment and analytical companies can make a significant contribution to help the introduction of continuous technology. A key point is that many of these challenges exist in batch processing and are not specific to continuous processing. Backward compatibility of software is not a continuous issue per se. In many cases, there is available learning from other industries. Business models and opportunities through outsourced development partners are also highlighted. Agile smaller companies and academic groups have a key role to play in developing skills, working collaboratively in partnerships, and focusing on solving relevant industry challenges. The precompetitive space differs for vendor companies compared with large pharmaceuticals. Currently, there is no strong consensus around a dominant continuous design, partly because of business dynamics and commercial interests. A more structured common approach to process design and hardware and software standardization would be beneficial, with initial practical steps in modeling. Conclusions include a digestible systems approach, accessible and published business cases, and increased user, academic, and supplier collaboration. This mirrors US FDA direction. The concept of silos in pharmaceutical companies is a common theme throughout the white papers. In the equipment domain, this is equally prevalent among a broad range of companies, mainly focusing on discrete areas. As an example, the flow chemistry and secondary drug product communities are almost entirely disconnected. Control and Process Analytical Technologies (PAT) companies are active in both domains. The equipment actors are a very diverse group with a few major Original Equipment Manufacturers (OEM) players and a variety of SME, project providers, integrators, upstream downstream providers, and specialist PAT. In some cases, partnerships or alliances are formed to increase critical mass. This white paper has focused on small molecules; equipment associated with biopharmaceuticals is covered in a separate white paper. More specifics on equipment detail are provided in final dosage form and drug substance white papers. The equipment and analytical development from laboratory to pilot to production is important, with a variety of sensors and complexity reducing with scale. The importance of robust processing rather than overcomplex control strategy mitigation is important. A search of nonacademic literature highlights, with a few notable exceptions, a relative paucity of material. Much focuses on the economics and benefits of continuous, rather than specifics of equipment issues. The disruptive nature of continuous manufacturing represents either an opportunity or a threat for many companies, so the incentive to change equipment varies. Also, for many companies, the pharmaceutical sector is not actually the dominant sector in terms of sales. © 2014 Wiley Periodicals, Inc. and the American Pharmacists Association.
Factors influencing kenaf harvesting and processing in the United States
USDA-ARS?s Scientific Manuscript database
The selection of the appropriate kenaf (Hibiscus cannabinus L., Malvaceae) production and harvest system is dependent on many factors, including location, equipment availability, storage options, processing plants, plant utilization, and economics. Since its first domestication, kenaf has consisten...
Space transportation system payload interface verification
NASA Technical Reports Server (NTRS)
Everline, R. T.
1977-01-01
The paper considers STS payload-interface verification requirements and the capability provided by STS to support verification. The intent is to standardize as many interfaces as possible, not only through the design, development, test and evaluation (DDT and E) phase of the major payload carriers but also into the operational phase. The verification process is discussed in terms of its various elements, such as the Space Shuttle DDT and E (including the orbital flight test program) and the major payload carriers DDT and E (including the first flights). Five tools derived from the Space Shuttle DDT and E are available to support the verification process: mathematical (structural and thermal) models, the Shuttle Avionics Integration Laboratory, the Shuttle Manipulator Development Facility, and interface-verification equipment (cargo-integration test equipment).
Code of Federal Regulations, 2014 CFR
2014-01-01
.... Assets includes furniture and equipment, leasehold improvements, and capitalized start-up costs. Data communication means transmitting and receiving of data to or from Banks, Federal Reserve offices, clearinghouse... for delivery of information; and telephone inquiry service. Data processing includes capture, storage...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-06
... questions that affect the level of export controls applicable to materials processing equipment and related... DEPARTMENT OF COMMERCE Bureau of Industry and Security Materials Processing Equipment; Technical Advisory Committee; Notice of Partially Closed Meeting The Materials Processing Equipment Technical...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
... questions that affect the level of export controls applicable to materials processing equipment and related... DEPARTMENT OF COMMERCE Bureau of Industry and Security Materials Processing Equipment Technical Advisory Committee; Notice of Partially Closed Meeting The Materials Processing Equipment Technical...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... questions that affect the level of export controls applicable to materials processing equipment and related... DEPARTMENT OF COMMERCE Bureau of Industry and Security Materials Processing Equipment Technical Advisory Committee; Notice of Partially Closed Meeting The Materials Processing Equipment Technical...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-31
... questions that affect the level of export controls applicable to materials processing equipment and related... DEPARTMENT OF COMMERCE Bureau of Industry and Security Materials Processing Equipment Technical Advisory Committee; Notice of Partially Closed Meeting The Materials Processing Equipment Technical...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-14
... that affect the level of export controls applicable to materials processing equipment and related... DEPARTMENT OF COMMERCE Bureau of Industry and Security Materials Processing Equipment Technical Advisory Committee; Notice of Partially Closed Meeting The Materials Processing Equipment Technical...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-19
... questions that affect the level of export controls applicable to materials processing equipment and related... DEPARTMENT OF COMMERCE Bureau of Industry and Security Materials Processing Equipment Technical Advisory Committee; Notice of Partially Closed Meeting The Materials Processing Equipment Technical...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-24
... questions that affect the level of export controls applicable to materials processing equipment and related... DEPARTMENT OF COMMERCE Bureau of Industry and Security Materials Processing Equipment Technical Advisory Committee; Notice of Partially Closed Meeting The Materials Processing Equipment Technical...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-02
... questions that affect the level of export controls applicable to materials processing equipment and related... DEPARTMENT OF COMMERCE Bureau of Industry and Security Materials Processing Equipment Technical Advisory Committee; Notice of Partially Closed Meeting The Materials Processing Equipment Technical...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-17
... questions that affect the level of export controls applicable to materials processing equipment and related... DEPARTMENT OF COMMERCE Bureau of Industry and Security Materials Processing Equipment Technical Advisory Committee; Notice of Partially Closed Meeting The Materials Processing Equipment Technical...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-19
... questions that affect the level of export controls applicable to materials processing equipment and related... DEPARTMENT OF COMMERCE Bureau of Industry and Security Materials Processing Equipment; Technical Advisory Committee; Notice of Partially Closed Meeting The Materials Processing Equipment Technical...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-23
... questions that affect the level of export controls applicable to materials processing equipment and related... DEPARTMENT OF COMMERCE Bureau of Industry and Security Materials Processing Equipment Technical Advisory Committee; Notice of Partially Closed Meeting The Materials Processing Equipment Technical...
NASA Astrophysics Data System (ADS)
Tan, Samantha H.; Chen, Ning; Liu, Shi; Wang, Kefei
2003-09-01
As part of the semiconductor industry "contamination-free manufacturing" effort, significant emphasis has been placed on reducing potential sources of contamination from process equipment and process equipment components. Process tools contain process chambers and components that are exposed to the process environment or process chemistry and in some cases are in direct contact with production wafers. Any contamination from these sources must be controlled or eliminated in order to maintain high process yields, device performance, and device reliability. This paper discusses new nondestructive analytical methods for quantitative measurement of the cleanliness of metal, quartz, polysilicon and ceramic components that are used in process equipment tools. The goal of these new procedures is to measure the effectiveness of cleaning procedures and to verify whether a tool component part is sufficiently clean for installation and subsequent routine use in the manufacturing line. These procedures provide a reliable "qualification method" for tool component certification and also provide a routine quality control method for reliable operation of cleaning facilities. Cost advantages to wafer manufacturing include higher yields due to improved process cleanliness and elimination of yield loss and downtime resulting from the installation of "bad" components in process tools. We also discuss a representative example of wafer contamination having been linked to a specific process tool component.
Facility Systems, Ground Support Systems, and Ground Support Equipment General Design Requirements
NASA Technical Reports Server (NTRS)
Thaxton, Eric A.; Mathews, Roger E.
2014-01-01
This standard establishes requirements and guidance for design and fabrication of ground systems (GS) that includes: ground support equipment (GSE), ground support systems (GSS), and facility ground support systems (F GSS) to provide uniform methods and processes for design and development of robust, safe, reliable, maintainable, supportable, and cost-effective GS in support of space flight and institutional programs and projects.
2008-10-15
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a worker prepares the equipment to help close the hatch on the Multi-Purpose Logistics Module Leonardo before it is transferred to a payload canister. Leonardo is the payload for space shuttle Endeavour's STS-126 mission to the International Space Station. The 15-day mission will deliver equipment and supplies to the space station in preparation for expansion from a three- to six-person resident crew aboard the complex. Leonardo holds supplies and equipment, including additional crew quarters, equipment for the regenerative life support system and spare hardware. Endeavour is targeted for launch Nov. 14. Photo credit: NASA/Troy Cryder
Oh, Ching Mien; Guo, Qiyun; Wan Sia Heng, Paul; Chan, Lai Wah
2014-07-01
In any manufacturing process, the success of producing an end product with the desired properties and yield depends on a range of factors that include the equipment, process and formulation variables. It is the interest of manufacturers and researchers to understand each manufacturing process better and ascertain the effects of various manufacturing-associated factors on the properties of the end product. Unless the manufacturing process is well understood, it would be difficult to set realistic limits for the process variables and raw material specifications to ensure consistently high-quality and reproducible end products. Over the years, spray congealing has been used to produce particulates by the food and pharmaceutical industries. The latter have used this technology to develop specialized drug delivery systems. In this review, basic principles as well as advantages and disadvantages of the spray congealing process will be covered. Recent developments in spray congealing equipment, process variables and formulation variables such as the matrix material, encapsulated material and additives will also be discussed. Innovative equipment designs and formulations for spray congealing have emerged. Judicious choice of atomizers, polymers and additives is the key to achieve the desired properties of the microparticles for drug delivery.
Mathaes, Roman; Mahler, Hanns-Christian; Buettiker, Jean-Pierre; Roehl, Holger; Lam, Philippe; Brown, Helen; Luemkemann, Joerg; Adler, Michael; Huwyler, Joerg; Streubel, Alexander; Mohl, Silke
2016-02-01
Parenteral drug products are protected by appropriate primary packaging to protect against environmental factors, including potential microbial contamination during shelf life duration. The most commonly used CCS configuration for parenteral drug products is the glass vial, sealed with a rubber stopper and an aluminum crimp cap. In combination with an adequately designed and controlled aseptic fill/finish processes, a well-designed and characterized capping process is indispensable to ensure product quality and integrity and to minimize rejections during the manufacturing process. In this review, the health authority requirements and expectations related to container closure system quality and container closure integrity are summarized. The pharmaceutical vial, the rubber stopper, and the crimp cap are described. Different capping techniques are critically compared: The most common capping equipment with a rotating capping plate produces the lowest amount of particle. The strength and challenges of methods to control the capping process are discussed. The residual seal force method can characterize the capping process independent of the used capping equipment or CCS. We analyze the root causes of several cosmetic defects associated with the vial capping process. Copyright © 2015 Elsevier B.V. All rights reserved.
Resistance of Listeria monocytogenes biofilms to sanitizing agents
USDA-ARS?s Scientific Manuscript database
Listeria monocytogenes is notorious for its capacity to colonize the environment and equipment of food processing facilities and to persist in the processing plant ecosystem, sometimes for decades. Such persistence is mediated by multiple attributes of L. monocytogenes, including the pathogen’s capa...
Code of Federal Regulations, 2010 CFR
2010-01-01
... allocable to a particular cost objective (i.e., a specific function, project, process, or organization) if...) Direct materials. (4) Other direct costs. (5) Processing materials and chemicals. (6) Power and other... equipment. (10) Added factor includes general and administrative costs and other support costs that are...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2010 CFR
2010-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2011 CFR
2011-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2012 CFR
2012-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2014 CFR
2014-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2013 CFR
2013-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
Microwave heating: Industrial applications. Citations from the Engineering Index data base
NASA Astrophysics Data System (ADS)
Reed, W. E.
1980-06-01
Industrialized uses of microwave heating are covered in 225 citations, 22 of which are new entries. The topics include industrial heating and drying for processes such as paper drying, vulcanization, and textile processing. Equipment design and safety are also cited.
40 CFR 62.14490 - Definitions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND... living organisms and their products, including vaccines, cultures, etc., intended for use in diagnosing..., process equipment, or a process to operate in a normal or usual manner. Failures that are caused, in part...
40 CFR 62.14490 - Definitions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND... living organisms and their products, including vaccines, cultures, etc., intended for use in diagnosing..., process equipment, or a process to operate in a normal or usual manner. Failures that are caused, in part...
40 CFR 62.14490 - Definitions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND..., including vaccines, cultures, etc., intended for use in diagnosing, immunizing, or treating humans or..., process equipment, or a process to operate in a normal or usual manner. Failures that are caused, in part...
Sprung, Charles L; Kesecioglu, Jozef
2010-04-01
To provide recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza pandemic or mass disaster with a specific focus on essential equipment, pharmaceuticals and supplies. Based on a literature review and expert opinion, a Delphi process was used to define the essential topics including essential equipment, pharmaceuticals and supplies. Key recommendations include: (1) ensure that adequate essential medical equipment, pharmaceuticals and important supplies are available during a disaster; (2) develop a communication and coordination system between health care facilities and local/regional/state/country governmental authorities for the provision of additional support; (3) determine the required resources, order and stockpile adequate resources, and judiciously distribute them; (4) acquire additional mechanical ventilators that are portable, provide adequate gas exchange for a range of clinical conditions, function with low-flow oxygen and without high pressure, and are safe for patients and staff; (5) provide advanced ventilatory support and rescue therapies including high levels of inspired oxygen and positive end-expiratory pressure, volume and pressure control ventilation, inhaled nitric oxide, high-frequency ventilation, prone positioning ventilation and extracorporeal membrane oxygenation; (6) triage scarce resources including equipment, pharmaceuticals and supplies based on those who are likely to benefit most or on a 'first come, first served' basis. Judicious planning and adoption of protocols for providing adequate equipment, pharmaceuticals and supplies are necessary to optimize outcomes during a pandemic.
Shuttle/payload communications and data systems interface analysis
NASA Technical Reports Server (NTRS)
Huth, G. K.
1980-01-01
The payload/orbiter functional command signal flow and telemetry signal flow are discussed. Functional descriptions of the various orbiter communication/avionic equipment involved in processing a command to a payload either from the ground through the orbiter by the payload specialist on the orbiter are included. Functional descriptions of the various orbiter communication/avionic equipment involved in processing telemetry data by the orbiter and transmitting the processed data to the ground are presented. The results of the attached payload/orbiter single processing and data handling system evaluation are described. The causes of the majority of attached payload/orbiter interface problems are delineated. A refined set of required flux density values for a detached payload to communicate with the orbiter is presented.
Automatic monitoring of the alignment and wear of vibration welding equipment
Spicer, John Patrick; Cai, Wayne W.; Chakraborty, Debejyo; Mink, Keith
2017-05-23
A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host machine, a check station, and a welding robot. At least one displacement sensor is positioned with respect to one of the welding equipment and the check station. The robot moves the horn and anvil via an arm to the check station, when a threshold condition is met, i.e., a predetermined amount of time has elapsed or a predetermined number of welds have been completed. The robot moves the horn and anvil to the check station, activates the at least one displacement sensor, at the check station, and determines a status condition of the welding equipment by processing the received signals. The status condition may be one of the alignment of the vibration welding equipment and the wear or degradation of the vibration welding equipment.
40 CFR 61.144 - Standard for manufacturing.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., twine, rope, thread, yarn, roving, lap, or other textile materials. (2) The manufacture of cement... manufacturing facility, including air cleaning devices, process equipment, and buildings housing material...
40 CFR 61.144 - Standard for manufacturing.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., twine, rope, thread, yarn, roving, lap, or other textile materials. (2) The manufacture of cement... manufacturing facility, including air cleaning devices, process equipment, and buildings housing material...
40 CFR 61.144 - Standard for manufacturing.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., twine, rope, thread, yarn, roving, lap, or other textile materials. (2) The manufacture of cement... manufacturing facility, including air cleaning devices, process equipment, and buildings housing material...
40 CFR 61.144 - Standard for manufacturing.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., twine, rope, thread, yarn, roving, lap, or other textile materials. (2) The manufacture of cement... manufacturing facility, including air cleaning devices, process equipment, and buildings housing material...
40 CFR 61.144 - Standard for manufacturing.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., twine, rope, thread, yarn, roving, lap, or other textile materials. (2) The manufacture of cement... manufacturing facility, including air cleaning devices, process equipment, and buildings housing material...
Recovery and Utilization of Extraterrestrial Resources
NASA Technical Reports Server (NTRS)
2004-01-01
This special bibliography includes the extraction, processing, and utilization of lunar, planetary, and asteroid resources; mining and excavation equipment, oxygen and propellant production; and in situ resource utilization.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Widergren, Steven E.; Knight, Mark R.; Melton, Ronald B.
The Interoperability Strategic Vision whitepaper aims to promote a common understanding of the meaning and characteristics of interoperability and to provide a strategy to advance the state of interoperability as applied to integration challenges facing grid modernization. This includes addressing the quality of integrating devices and systems and the discipline to improve the process of successfully integrating these components as business models and information technology improve over time. The strategic vision for interoperability described in this document applies throughout the electric energy generation, delivery, and end-use supply chain. Its scope includes interactive technologies and business processes from bulk energy levelsmore » to lower voltage level equipment and the millions of appliances that are becoming equipped with processing power and communication interfaces. A transformational aspect of a vision for interoperability in the future electric system is the coordinated operation of intelligent devices and systems at the edges of grid infrastructure. This challenge offers an example for addressing interoperability concerns throughout the electric system.« less
Underground coal mining section data
NASA Technical Reports Server (NTRS)
Gabrill, C. P.; Urie, J. T.
1981-01-01
A set of tables which display the allocation of time for ten personnel and eight pieces of underground coal mining equipment to ten function categories is provided. Data from 125 full shift time studies contained in the KETRON database was utilized as the primary source data. The KETRON activity and delay codes were mapped onto JPL equipment, personnel and function categories. Computer processing was then performed to aggregate the shift level data and generate the matrices. Additional, documented time study data were analyzed and used to supplement the KETRON databased. The source data including the number of shifts are described. Specific parameters of the mines from which there data were extracted are presented. The result of the data processing including the required JPL matrices is presented. A brief comparison with a time study analysis of continuous mining systems is presented. The procedures used for processing the source data are described.
Low-cost high purity production
NASA Technical Reports Server (NTRS)
Kapur, V. K.
1978-01-01
Economical process produces high-purity silicon crystals suitable for use in solar cells. Reaction is strongly exothermic and can be initiated at relatively low temperature, making it potentially suitable for development into low-cost commercial process. Important advantages include exothermic character and comparatively low process temperatures. These could lead to significant savings in equipment and energy costs.
40 CFR 60.103a - Design, equipment, work practice or operational standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Description and simple process flow diagram showing the interconnection of the following components of the... rate. (iv) Description and simple process flow diagram showing all gas lines (including flare, purge... which lines are monitored and identify on the process flow diagram the location and type of each monitor...
40 CFR 60.103a - Design, equipment, work practice or operational standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Description and simple process flow diagram showing the interconnection of the following components of the... rate. (iv) Description and simple process flow diagram showing all gas lines (including flare, purge... which lines are monitored and identify on the process flow diagram the location and type of each monitor...
Abatement of waste gases and water during the processes of semiconductor fabrication.
Wen, Rui-mei; Liang, Jun-wu
2002-10-01
The purpose of this article is to examine the methods and equipment for abating waste gases and water produced during the manufacture of semiconductor materials and devices. Three separating methods and equipment are used to control three different groups of electronic wastes. The first group includes arsine and phosphine emitted during the processes of semiconductor materials manufacture. The abatement procedure for this group of pollutants consists of adding iodates, cupric and manganese salts to a multiple shower tower (MST) structure. The second group includes pollutants containing arsenic, phosphorus, HF, HCl, NO2, and SO3 emitted during the manufacture of semiconductor materials and devices. The abatement procedure involves mixing oxidants and bases in an oval column with a separator in the middle. The third group consists of the ions of As, P and heavy metals contained in the waste water. The abatement procedure includes adding CaCO3 and ferric salts in a flocculation-sedimentation compact device equipment. Test results showed that all waste gases and water after the abatement procedures presented in this article passed the discharge standards set by the State Environmental Protection Administration of China.
Technical information report: Plasma melter operation, reliability, and maintenance analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hendrickson, D.W.
1995-03-14
This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.
Suzuki, Kazumichi; Gillin, Michael T; Sahoo, Narayan; Zhu, X Ronald; Lee, Andrew K; Lippy, Denise
2011-07-01
To evaluate patient census, equipment clinical availability, maximum daily treatment capacity, use factor for major beam delivery parameters, and treatment process time for actual treatments delivered by proton therapy systems. The authors have been recording all beam delivery parameters, including delivered dose, energy, range, spread-out Bragg peak widths, gantry angles, and couch angles for every treatment field in an electronic medical record system. We analyzed delivery system downtimes that had been recorded for every equipment failure and associated incidents. These data were used to evaluate the use factor of beam delivery parameters, the size of the patient census, and the equipment clinical availability of the facility. The duration of each treatment session from patient walk-in and to patient walk-out of the treatment room was measured for 82 patients with cancers at various sites. The yearly average equipment clinical availability in the last 3 yrs (June 2007-August 2010) was 97%, which exceeded the target of 95%. Approximately 2200 patients had been treated as of August 2010. The major disease sites were genitourinary (49%), thoracic (25%), central nervous system (22%), and gastrointestinal (2%). Beams have been delivered in approximately 8300 treatment fields. The use factor for six beam delivery parameters was also evaluated. Analysis of the treatment process times indicated that approximately 80% of this time was spent for patient and equipment setup. The other 20% was spent waiting for beam delivery and beam on. The total treatment process time can be expressed by a quadratic polynomial of the number of fields per session. The maximum daily treatment capacity of our facility using the current treatment processes was estimated to be 133 +/- 35 patients. This analysis shows that the facility has operated at a high performance level and has treated a large number of patients with a variety of diseases. The use factor of beam delivery parameters varies by disease site. Further improvements in efficiency may be realized in the equipment- and patient-related processes of treatment.
Trade Study of Excavation Tools and Equipment for Lunar Outpost Development and ISRU
NASA Astrophysics Data System (ADS)
Mueller, R. P.; King, R. H.
2008-01-01
The NASA Lunar Architecture Team (LAT) has developed a candidate architecture to establish a lunar outpost that includes in-situ resource utilization (ISRU). Outpost development requires excavation for landing and launch sites, roads, trenches, foundations, radiation and thermal shielding, etc. Furthermore, ISRU requires excavation as feed stock for water processing and oxygen production plants. The design environment for lunar excavation tools and equipment including low gravity, cost of launching massive equipment, limited power, limited size, high reliability, and extreme temperatures is significantly different from terrestrial excavation equipment design environment. Consequently, the lunar application requires new approaches to developing excavation tools and equipment in the context of a systems engineering approach to building a Lunar Outpost. Several authors have proposed interesting and innovative general excavation approaches in the literature, and the authors of this paper will propose adaptations and/or new excavation concepts specific to the Lunar Outpost. The requirements for excavation from the LAT architecture will be examined and quantified with corresponding figures of merit and evaluation criteria. This paper will evaluate the proposed approaches using traditional decision making with uncertainty techniques.
USDA-ARS?s Scientific Manuscript database
First-generation (ie., corn-based) fuel ethanol production processes provide several advantages which could be synergistically applied to overcome limitations of second-generation biofuel processes from lignocellulose. These include resources such as equipment, manpower, nutrients, water, and heat....
USDA-ARS?s Scientific Manuscript database
Corn-based fuel ethanol production processes provide several advantages which could be synergistically applied to overcome limitations of biofuel processes based on lignocellulose. These include resources such as equipment, manpower, nutrients, water, and heat. The fact that several demonstration-...
40 CFR 418.11 - Specialized definitions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... including precipitation runoff which, during manufacturing or processing, comes into incidental contact with...) Precipitation runoff; (2) accidental spills; (3) accidental leaks caused by the failure of process equipment and... shall mean the maximum 24-hour precipitation event with a probable recurrence interval of once in 10...
A Competency-Based Instructional Program for Plant Process Operations.
ERIC Educational Resources Information Center
McDaniel, Joy; Mills, Steven
This program guide provides materials to prepare learners for employment as Process Plant Operators through classroom instruction and practical shop experience. Contents include instructional goal and subgoals, an instructional analysis that describes development of the materials and instructional equipment and supplies and facilities…
ERIC Educational Resources Information Center
Natale, Joseph L.
This chapter of "Principles of School Business Management" discusses the effective management of purchasing processes in a school district. These processes include obtaining materials, supplies, and equipment of maximum value for the least expense, and receiving, storing, and distributing the items obtained. The chapter opens with an overview of…
Free-world microelectronic manufacturing equipment
NASA Astrophysics Data System (ADS)
Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.
1988-12-01
Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.
2004-01-22
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, a cameraman films part of Discovery’s payload bay for a special feature on the KSC Web. In the background is the open hatch of the airlock, located inside the middeck of the spacecraft’s pressurized crew cabin. The airlock is sized to accommodate two fully suited flight crew members simultaneously. Support functions include airlock depressurization and repressurization, extravehicular activity equipment recharge, liquid-cooled garment water cooling, EVA equipment checkout, donning and communications. The outer hatch isolates the airlock from the unpressurized payload bay when closed and permits the EVA crew members to exit from the airlock to the payload bay when open.
2008-10-15
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers prepare to close the hatch on the Multi-Purpose Logistics Module Leonardo. The module is the payload for space shuttle Endeavour's STS-126 mission to the International Space Station. The 15-day mission will deliver equipment and supplies to the space station in preparation for expansion from a three- to six-person resident crew aboard the complex. Leonardo holds supplies and equipment, including additional crew quarters, equipment for the regenerative life support system and spare hardware. Endeavour is targeted for launch Nov. 14. Photo credit: NASA/Jim Grossmann
2008-10-15
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, this worker helps prepare the hatch on the Multi-Purpose Logistics Module Leonardo for closure. Leonardo is the payload for space shuttle Endeavour's STS-126 mission to the International Space Station. The 15-day mission will deliver equipment and supplies to the space station in preparation for expansion from a three- to six-person resident crew aboard the complex. Leonardo holds supplies and equipment, including additional crew quarters, equipment for the regenerative life support system and spare hardware. Endeavour is targeted for launch Nov. 14. Photo credit: NASA/Jim Grossmann
2008-10-15
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers prepare to close the hatch on the Multi-Purpose Logistics Module Leonardo. The module is the payload for space shuttle Endeavour's STS-126 mission to the International Space Station. The 15-day mission will deliver equipment and supplies to the space station in preparation for expansion from a three- to six-person resident crew aboard the complex. Leonardo holds supplies and equipment, including additional crew quarters, equipment for the regenerative life support system and spare hardware. Endeavour is targeted for launch Nov. 14. Photo credit: NASA/Jim Grossmann
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. -- Technicians in the Orbiter Processing Facility attach a crane to Discoverys airlock before lifting it for installation. The airlock is located inside the orbiters payload bay and is sized to accommodate two fully suited flight crew members simultaneously. Support functions include airlock depressurization and repressurization, extravehicular activity equipment recharge, liquid-cooled garment water cooling, EVA equipment checkout, and communications. Discovery is designated as the Return to Flight vehicle for mission STS-114, no earlier than March 2005. STS-114 mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment plus the external stowage platform to the International Space Station.
Surface electrical properties experiment, part 1. [flown on Apollo 17
NASA Technical Reports Server (NTRS)
Strangway, D. W.; Annan, A. P.; Redman, J. D.; Rossiter, J. R.; Rylaarsdam, J. A.; Watts, R. D.
1974-01-01
The work is reported which was performed on the Surface Electrical Properties Experiment Data Acquisition System. Areas discussed include: data handling and processing, installation and external signal application, operation of the equipment, and digital output. Detailed circuit descriptions are included.
Lokhandwala, Kaaeid A.
2000-01-01
A process for conditioning natural gas containing C.sub.3+ hydrocarbons and/or acid gas, so that it can be used as combustion fuel to run gas-powered equipment, including compressors, in the gas field or the gas processing plant. Compared with prior art processes, the invention creates lesser quantities of low-pressure gas per unit volume of fuel gas produced. Optionally, the process can also produce an NGL product.
Process feasibility study in support of silicon material task 1
NASA Technical Reports Server (NTRS)
Fang, C. S.; Hansen, K. C.; Miller, J. W., Jr.; Yaws, C. L.
1978-01-01
Initial results for gas thermal conductivity of silicon tetrafluoride and trichlorosilane are reported in respective temperature ranges of 25 to 400 C and 50 to 400 C. For chemical engineering analyses, the preliminary process design for the original silane process of Union Carbide was completed for Cases A and B, Regular and Minimum Process Storage. Included are raw material usage, utility requirements, major process equipment lists, and production labor requirements. Because of the large differences in surge tankage between major unit operations the fixed capital investment varied from $19,094,000 to $11,138,000 for Cases A and B, respectively. For the silane process the original flowsheet was revised for a more optimum arrangement of major equipment, raw materials and operating conditions. The initial issue of the revised flowsheet (Case C) for the silane process indicated favorable cost benefits over the original scheme.
Web-Based Requesting and Scheduling Use of Facilities
NASA Technical Reports Server (NTRS)
Yeager, Carolyn M.
2010-01-01
Automated User's Training Operations Facility Utilization Request (AutoFUR) is prototype software that administers a Web-based system for requesting and allocating facilities and equipment for astronaut-training classes in conjunction with scheduling the classes. AutoFUR also has potential for similar use in such applications as scheduling flight-simulation equipment and instructors in commercial airplane-pilot training, managing preventive- maintenance facilities, and scheduling operating rooms, doctors, nurses, and medical equipment for surgery. Whereas requesting and allocation of facilities was previously a manual process that entailed examination of documents (including paper drawings) from different sources, AutoFUR partly automates the process and makes all of the relevant information available via the requester s computer. By use of AutoFUR, an instructor can fill out a facility-utilization request (FUR) form on line, consult the applicable flight manifest(s) to determine what equipment is needed and where it should be placed in the training facility, reserve the corresponding hardware listed in a training-hardware inventory database, search for alternative hardware if necessary, submit the FUR for processing, and cause paper forms to be printed. Auto-FUR also maintains a searchable archive of prior FURs.
Plasma Diagnostics: Use and Justification in an Industrial Environment
NASA Astrophysics Data System (ADS)
Loewenhardt, Peter
1998-10-01
The usefulness and importance of plasma diagnostics have played a major role in the development of plasma processing tools in the semiconductor industry. As can be seen through marketing materials from semiconductor equipment manufacturers, results from plasma diagnostic equipment can be a powerful tool in selling the technological leadership of tool design. Some diagnostics have long been used for simple process control such as optical emission for endpoint determination, but in recent years more sophisticated and involved diagnostic tools have been utilized in chamber and plasma source development and optimization. It is now common to find an assortment of tools at semiconductor equipment companies such as Langmuir probes, mass spectrometers, spatial optical emission probes, impedance, ion energy and ion flux probes. An outline of how the importance of plasma diagnostics has grown at an equipment manufacturer over the last decade will be given, with examples of significant and useful results obtained. Examples will include the development and optimization of an inductive plasma source, trends and hardware effects on ion energy distributions, mass spectrometry influences on process development and investigations of plasma-wall interactions. Plasma diagnostic focus, in-house development and proliferation in an environment where financial justification requirements are both strong and necessary will be discussed.
[A design of software for management of hospital equipment maintenance process].
Xie, Haiyuan; Liu, Yiqing
2010-03-01
According to the circumstance of hospital equipment maintenance, we designed a computer program for management of hospital equipment maintenance process by Java programming language. This program can control the maintenance process, increase the efficiency; and be able to fix the equipment location.
NASA Technical Reports Server (NTRS)
Haratunian, M.
1985-01-01
A system of access platforms and equipment within the space shuttle orbiter processing facility at Kennedy Space Center is described. The design challenges of the platforms, including clearance envelopes, load criteria, and movement, are discussed. Various applications of moveable platforms are considered.
48 CFR 52.234-1 - Industrial Resources Developed Under Defense Production Act Title III.
Code of Federal Regulations, 2011 CFR
2011-10-01
... materials, services, processes, or manufacturing equipment (including the processes, technologies, and... project contractor for testing and qualification of a Title III industrial resource to the Contracting... Contracting Officer modifies the contract to direct testing pursuant to this clause, the Government will...
45 CFR 1355.57 - Cost allocation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... collection and information retrieval system described in § 1355.53 of this part shall be treated as necessary... includes functions, processing, information collection and management, equipment or services that are not...
45 CFR 1355.57 - Cost allocation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... collection and information retrieval system described in § 1355.53 of this part shall be treated as necessary... includes functions, processing, information collection and management, equipment or services that are not...
Analysis of flow field characteristics in IC equipment chamber based on orthogonal design
NASA Astrophysics Data System (ADS)
Liu, W. F.; Yang, Y. Y.; Wang, C. N.
2017-01-01
This paper aims to study the influence of the configuration of processing chamber as a part of IC equipment on flow field characteristics. Four parameters, including chamber height, chamber diameter, inlet mass flow rate and outlet area, are arranged using orthogonally design method to study their influence on flow distribution in the processing chamber with the commercial software-Fluent. The velocity, pressure and temperature distribution above the holder were analysed respectively. The velocity difference value of the gas flow above the holder is defined as the evaluation criteria to evaluate the uniformity of the gas flow. The quantitative relationship between key parameters and the uniformity of gas flow was found through analysis of experimental results. According to our study, the chamber height is the most significant factor, and then follows the outlet area, chamber diameter and inlet mass flow rate. This research can provide insights into the study and design of configuration of etcher, plasma enhanced chemical vapor deposition (PECVD) equipment, and other systems with similar configuration and processing condition.
49 CFR 178.61 - Specification 4BW welded steel cylinders with electric-arc welded longitudinal seam.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... Cylinders closed in by spinning process are not authorized. (b) Authorized steel. Steel used in the.... Cylinders must be manufactured using equipment and processes adequate to ensure that each cylinder produced... seams must be of the butt welded type. Welds must be made by a machine process including automatic feed...
49 CFR 178.61 - Specification 4BW welded steel cylinders with electric-arc welded longitudinal seam.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... Cylinders closed in by spinning process are not authorized. (b) Authorized steel. Steel used in the.... Cylinders must be manufactured using equipment and processes adequate to ensure that each cylinder produced... seams must be of the butt welded type. Welds must be made by a machine process including automatic feed...
49 CFR 178.61 - Specification 4BW welded steel cylinders with electric-arc welded longitudinal seam.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... Cylinders closed in by spinning process are not authorized. (b) Authorized steel. Steel used in the.... Cylinders must be manufactured using equipment and processes adequate to ensure that each cylinder produced... seams must be of the butt welded type. Welds must be made by a machine process including automatic feed...
Orbital construction support equipment
NASA Technical Reports Server (NTRS)
1977-01-01
Approximately 200 separate construction steps were defined for the three solar power satellite (SPS) concepts. Detailed construction scenarios were developed which describe the specific tasks to be accomplished, and identify general equipment requirements. The scenarios were used to perform a functional analysis, which resulted in the definition of 100 distinct SPS elements. These elements are the components, parts, subsystems, or assemblies upon which construction activities take place. The major SPS elements for each configuration are shown. For those elements, 300 functional requirements were identified in seven generic processes. Cumulatively, these processes encompass all functions required during SPS construction/assembly. Individually each process is defined such that it includes a specific type of activity. Each SPS element may involve activities relating to any or all of the generic processes. The processes are listed, and examples of the requirements defined for a typical element are given.
The effect of using bomb calorimeter in improving science process skills of physics students
NASA Astrophysics Data System (ADS)
Edie, S. S.; Masturi; Safitri, H. N.; Alighiri, D.; Susilawati; Sari, L. M. E. K.; Marwoto, P.; Iswari, R. S.
2018-03-01
The bomb calorimeter is laboratory equipment which serves to calculate the value of combustion heat or heat capacity of a sample in excess oxygen combustion. This study aims to determine the effect of using bomb calorimeter on science process skill of physics students. Influences include the effectiveness of using the equipment and knowing the improvement of students’ science process skills before and after using tools. The sample used simple random sampling with one group pretest-posttest research design. The instrument that used is written test that adjusts with science process skills aspect. Analysis of the effectiveness of bomb calorimeter showed useful result 87.88%, while the study of science skill improvement showed n-gain value 0.64 that is the medium category.
Remote Sensing as a Demonstration of Applied Physics.
ERIC Educational Resources Information Center
Colwell, Robert N.
1980-01-01
Provides information about the field of remote sensing, including discussions of geo-synchronous and sun-synchronous remote-sensing platforms, the actual physical processes and equipment involved in sensing, the analysis of images by humans and machines, and inexpensive, small scale methods, including aerial photography. (CS)
Flexible distributed architecture for semiconductor process control and experimentation
NASA Astrophysics Data System (ADS)
Gower, Aaron E.; Boning, Duane S.; McIlrath, Michael B.
1997-01-01
Semiconductor fabrication requires an increasingly expensive and integrated set of tightly controlled processes, driving the need for a fabrication facility with fully computerized, networked processing equipment. We describe an integrated, open system architecture enabling distributed experimentation and process control for plasma etching. The system was developed at MIT's Microsystems Technology Laboratories and employs in-situ CCD interferometry based analysis in the sensor-feedback control of an Applied Materials Precision 5000 Plasma Etcher (AME5000). Our system supports accelerated, advanced research involving feedback control algorithms, and includes a distributed interface that utilizes the internet to make these fabrication capabilities available to remote users. The system architecture is both distributed and modular: specific implementation of any one task does not restrict the implementation of another. The low level architectural components include a host controller that communicates with the AME5000 equipment via SECS-II, and a host controller for the acquisition and analysis of the CCD sensor images. A cell controller (CC) manages communications between these equipment and sensor controllers. The CC is also responsible for process control decisions; algorithmic controllers may be integrated locally or via remote communications. Finally, a system server images connections from internet/intranet (web) based clients and uses a direct link with the CC to access the system. Each component communicates via a predefined set of TCP/IP socket based messages. This flexible architecture makes integration easier and more robust, and enables separate software components to run on the same or different computers independent of hardware or software platform.
49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).
Code of Federal Regulations, 2012 CFR
2012-10-01
... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2012-10-01 2012-10-01 false Computers and data processing equipment (account...
49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).
Code of Federal Regulations, 2013 CFR
2013-10-01
... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2013-10-01 2013-10-01 false Computers and data processing equipment (account...
49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).
Code of Federal Regulations, 2011 CFR
2011-10-01
... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2011-10-01 2011-10-01 false Computers and data processing equipment (account...
49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).
Code of Federal Regulations, 2014 CFR
2014-10-01
... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2014-10-01 2014-10-01 false Computers and data processing equipment (account...
49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).
Code of Federal Regulations, 2010 CFR
2010-10-01
... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2010-10-01 2010-10-01 false Computers and data processing equipment (account...
32 CFR 855.14 - Unauthorized landings.
Code of Federal Regulations, 2012 CFR
2012-07-01
... equipment and tools, and so forth, to include, but not limited to: (A) Spreading foam on the runway. (B... increase reporting, processing, and staffing costs; therefore, the unauthorized landing fee for paragraph...
NASA Technical Reports Server (NTRS)
1975-01-01
A comparison was made between the environmental impact of the present nuclear-heated process and the currently commercial hydrogen-producing process utilizing coal for heating, i.e., the Lurgi coal gasification process. This comparison is based on the assumption that both plants produce the same quantity of H2, i.e., 269 cu m/sec of approximately the same purity, that all pollution abatement equipment is of the same design and efficiency for both the Lurgi process and the nuclear process, and that the energy required for the fresh nuclear fuel and the fuel recycle is generated in a power plant which is also provided with pollution abatement equipment. The pollution caused by the auxiliary units is also taken into account. As regards process water usage, the data show that the water required for the nuclear route, including the nuclear fuel production, is approximately 78% of that required for the Lurgi route.
Commercial Digital/ADP Equipment in the Ocean Environment. Volume 2. User Appendices
1978-12-15
is that the LINDA system uses a mini computer with a time sharing system software which allows several terminals to be operated at the same time...Acquisition System (ODAS) consists of sensors, computer hardware and computer software . Certain sensors are interfaced to the computers for real time...on USNS KANE, USNS BENT, and USKS WILKES. Commercial automatic data processing equipment used in ODAS includes: Item Model Computer PDP-9 Tape
12 CFR 7.5006 - Data processing.
Code of Federal Regulations, 2014 CFR
2014-01-01
... services, facilities (including equipment, technology, and personnel), data bases, advice and access to such services, facilities, data bases and advice, for itself and for others, where the data is banking... 12 Banks and Banking 1 2014-01-01 2014-01-01 false Data processing. 7.5006 Section 7.5006 Banks...
12 CFR 7.5006 - Data processing.
Code of Federal Regulations, 2013 CFR
2013-01-01
... services, facilities (including equipment, technology, and personnel), data bases, advice and access to such services, facilities, data bases and advice, for itself and for others, where the data is banking... 12 Banks and Banking 1 2013-01-01 2013-01-01 false Data processing. 7.5006 Section 7.5006 Banks...
12 CFR 7.5006 - Data processing.
Code of Federal Regulations, 2012 CFR
2012-01-01
... services, facilities (including equipment, technology, and personnel), data bases, advice and access to such services, facilities, data bases and advice, for itself and for others, where the data is banking... 12 Banks and Banking 1 2012-01-01 2012-01-01 false Data processing. 7.5006 Section 7.5006 Banks...
Handbook for Educational Buildings Planning. Educational Building and Equipment 9.
ERIC Educational Resources Information Center
Almeida, Rodolfo
Stages in the educational facility planning process are presented in this handbook, with a second focus on implementation. Four chapters provide information on the four cycles of the planning process, which include analysis and diagnosis, research and development, planning and programming, and implementation and evaluation. Characteristics of an…
Displays, memories, and signal processing: A compilation
NASA Technical Reports Server (NTRS)
1975-01-01
Articles on electronics systems and techniques were presented. The first section is on displays and other electro-optical systems; the second section is devoted to signal processing. The third section presented several new memory devices for digital equipment, including articles on holographic memories. The latest patent information available is also given.
Anaerobic Digestion. Student Manual. Biological Treatment Process Control.
ERIC Educational Resources Information Center
Carnegie, John W., Ed.
This student manual contains the textual material for a four-lesson unit on anaerobic digestion control. Areas addressed include: (1) anaerobic sludge digestion (considering the nature of raw sludge, purposes of anaerobic digestion, the results of digestion, types of equipment, and other topics); (2) digester process control (considering feeding…
Choi, Kwang-Min; An, Hee-Chul; Kim, Kwan-Sick
2015-01-01
Semiconductor manufacturing processes generate powder particles as byproducts which potentially could affect workers' health. The chemical composition, size, shape, and crystal structure of these powder particles were investigated by scanning electron microscopy equipped with an energy dispersive spectrometer, Fourier transform infrared spectrometry, and X-ray diffractometry. The powders generated in diffusion and chemical mechanical polishing processes were amorphous silica. The particles in the chemical vapor deposition (CVD) and etch processes were TiO(2) and Al(2)O(3), and Al(2)O(3) particles, respectively. As for metallization, WO(3), TiO(2), and Al(2)O(3) particles were generated from equipment used for tungsten and barrier metal (TiN) operations. In photolithography, the size and shape of the powder particles showed 1-10 μm and were of spherical shape. In addition, the powders generated from high-current and medium-current processes for ion implantation included arsenic (As), whereas the high-energy process did not include As. For all samples collected using a personal air sampler during preventive maintenance of process equipment, the mass concentrations of total airborne particles were < 1 μg, which is the detection limit of the microbalance. In addition, the mean mass concentrations of airborne PM10 (particles less than 10 μm in diameter) using direct-reading aerosol monitor by area sampling were between 0.00 and 0.02 μg/m(3). Although the exposure concentration of airborne particles during preventive maintenance is extremely low, it is necessary to make continuous improvements to the process and work environment, because the influence of chronic low-level exposure cannot be excluded.
Integrated Glass Coating Manufacturing Line
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brophy, Brenor
2015-09-30
This project aims to enable US module manufacturers to coat glass with Enki’s state of the art tunable functionalized AR coatings at the lowest possible cost and highest possible performance by encapsulating Enki’s coating process in an integrated tool that facilitates effective process improvement through metrology and data analysis for greater quality and performance while reducing footprint, operating and capital costs. The Phase 1 objective was a fully designed manufacturing line, including fully specified equipment ready for issue of purchase requisitions; a detailed economic justification based on market prices at the end of Phase 1 and projected manufacturing costs andmore » a detailed deployment plan for the equipment.« less
Advances in Thermal Spray Coatings for Gas Turbines and Energy Generation: A Review
NASA Astrophysics Data System (ADS)
Hardwicke, Canan U.; Lau, Yuk-Chiu
2013-06-01
Functional coatings are widely used in energy generation equipment in industries such as renewables, oil and gas, propulsion engines, and gas turbines. Intelligent thermal spray processing is vital in many of these areas for efficient manufacturing. Advanced thermal spray coating applications include thermal management, wear, oxidation, corrosion resistance, sealing systems, vibration and sound absorbance, and component repair. This paper reviews the current status of materials, equipment, processing, and properties' aspects for key coatings in the energy industry, especially the developments in large-scale gas turbines. In addition to the most recent industrial advances in thermal spray technologies, future technical needs are also highlighted.
Breckinridge Project, initial effort
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1982-01-01
Report V, Volume 4 provides descriptions, data, and drawings pertaining to Instrument and Plant Air Systems (Plant 36), Telecommunication Systems (Plant 37), Inert Gas Systems (Plant 38), Purge and Flush Oil Systems (Plant 39), Site Development and Roads (Plant 40), Buildings (Plant 41), Solid Waste Management (Plant 42), and Landfill (Plant 44). Instrument and Plant Air Systems (Plant 36) includes all equipment and piping necessary to supply instrument and utility air to the process plants and offsite facilities. Telecommunication Systems (Plant 37) includes the equipment and wiring for: communication throughout the facility; communication between plant data processing systems and offsitemore » computing facilities; and communication with transportation carriers. Inert Gas Systems (Plant 38) provides high purity and low purity nitrogen streams for plant startup and normal operation. Purge and Flush Oil Systems (Plant 39) provides purge and flush oils to various plants. Site Development and Roads (Plant 40) provides site leveling, the addition of roads, fencing, and drainage, and the placement of fills, pilings, footings, and foundations for plants. Buildings (Plant 41) provides buildings for equipment and for personnel, including utilities, lighting, sanitary facilities, heating, air conditioning, and ventilation. Solid Waste Management (Plant 42) identifies, characterizes, segregates, and transports the various types of solid wastes to either Landfill (Plant 44) or outside disposal sites. Landfill (Plant 44) provides disposal of both nonhazardous and hazardous solid wastes. Information is included (as applicable) for each of the eight plants described.« less
2008-10-15
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers begin closing the hatch on the Multi-Purpose Logistics Module Leonardo before it is transferred to a payload canister. Leonardo is the payload for space shuttle Endeavour's STS-126 mission to the International Space Station. The 15-day mission will deliver equipment and supplies to the space station in preparation for expansion from a three- to six-person resident crew aboard the complex. Leonardo holds supplies and equipment, including additional crew quarters, equipment for the regenerative life support system and spare hardware. Endeavour is targeted for launch Nov. 14. Photo credit: NASA/Troy Cryder
2008-10-15
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers close the hatch on the Multi-Purpose Logistics Module Leonardo before it is transferred to a payload canister. Leonardo is the payload for space shuttle Endeavour's STS-126 mission to the International Space Station. The 15-day mission will deliver equipment and supplies to the space station in preparation for expansion from a three- to six-person resident crew aboard the complex. Leonardo holds supplies and equipment, including additional crew quarters, equipment for the regenerative life support system and spare hardware. Endeavour is targeted for launch Nov. 14. Photo credit: NASA/Troy Cryder
2008-10-15
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers begin closing the hatch on the Multi-Purpose Logistics Module Leonardo before it is transferred to a payload canister. Leonardo is the payload for space shuttle Endeavour's STS-126 mission to the International Space Station. The 15-day mission will deliver equipment and supplies to the space station in preparation for expansion from a three- to six-person resident crew aboard the complex. Leonardo holds supplies and equipment, including additional crew quarters, equipment for the regenerative life support system and spare hardware. Endeavour is targeted for launch Nov. 14. Photo credit: NASA/Troy Cryder
2008-10-15
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers are closing the hatch on the Multi-Purpose Logistics Module Leonardo before it is transferred to a payload canister. Leonardo is the payload for space shuttle Endeavour's STS-126 mission to the International Space Station. The 15-day mission will deliver equipment and supplies to the space station in preparation for expansion from a three- to six-person resident crew aboard the complex. Leonardo holds supplies and equipment, including additional crew quarters, equipment for the regenerative life support system and spare hardware. Endeavour is targeted for launch Nov. 14. Photo credit: NASA/Troy Cryder
2008-10-15
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Multi-Purpose Logistics Module Leonardo is being prepared for hatch closure before it is transferred to a payload canister. Leonardo is the payload for space shuttle Endeavour's STS-126 mission to the International Space Station. The 15-day mission will deliver equipment and supplies to the space station in preparation for expansion from a three- to six-person resident crew aboard the complex. Leonardo holds supplies and equipment, including additional crew quarters, equipment for the regenerative life support system and spare hardware. Endeavour is targeted for launch Nov. 14. Photo credit: NASA/Jim Grossmann
Safety in the Chemical Laboratory: Fire Safety and Fire Control in the Chemistry Laboratory.
ERIC Educational Resources Information Center
Wilbraham, A. C.
1979-01-01
Discusses fire safety and fire control in the chemistry laboratory. The combustion process, extinguishing equipment, extinguisher maintenance and location, and fire safety and practices are included. (HM)
SLOPE STABILITY EVALUATION AND EQUIPMENT SETBACK DISTANCES FOR BURIAL GROUND EXCAVATIONS
DOE Office of Scientific and Technical Information (OSTI.GOV)
MCSHANE DS
2010-03-25
After 1970 Transuranic (TRU) and suspect TRU waste was buried in the ground with the intention that at some later date the waste would be retrieved and processed into a configuration for long term storage. To retrieve this waste the soil must be removed (excavated). Sloping the bank of the excavation is the method used to keep the excavation from collapsing and to provide protection for workers retrieving the waste. The purpose of this paper is to document the minimum distance (setback) that equipment must stay from the edge of the excavation to maintain a stable slope. This evaluation examinesmore » the equipment setback distance by dividing the equipment into two categories, (1) equipment used for excavation and (2) equipment used for retrieval. The section on excavation equipment will also discuss techniques used for excavation including the process of benching. Calculations 122633-C-004, 'Slope Stability Analysis' (Attachment A), and 300013-C-001, 'Crane Stability Analysis' (Attachment B), have been prepared to support this evaluation. As shown in the calculations the soil has the following properties: Unit weight 110 pounds per cubic foot; and Friction Angle (natural angle of repose) 38{sup o} or 1.28 horizontal to 1 vertical. Setback distances are measured from the top edge of the slope to the wheels/tracks of the vehicles and heavy equipment being utilized. The computer program utilized in the calculation uses the center of the wheel or track load for the analysis and this difference is accounted for in this evaluation.« less
NASA Technical Reports Server (NTRS)
Schwarz, F. C.
1971-01-01
Processing of electric power has been presented as a discipline that draws on almost every field of electrical engineering, including system and control theory, communications theory, electronic network design, and power component technology. The cost of power processing equipment, which often equals that of expensive, sophisticated, and unconventional sources of electrical energy, such as solar batteries, is a significant consideration in the choice of electric power systems.
[Hygienic assessment of conditions of the exploitation of facilities of the urban drainage system].
Alikbayeva, L A; Iakubova, I Sh; Ryzhkov, A L; Lavrinova, A A; Sidorov, A A
The aim of the study was the hygienic characteristics of the location of sewage pumping stations (SPSs) in the residential area of the city and the assessment of working conditions for the staff. The features of the technological process at the SPSs resulted in the formation of specific working conditions characterized by the presence of a cooling microclimate, noise production, technological vibration, air pollution by microorganisms. The assessment of working conditions has allowed to refer them to the 3 class (harmful working conditions) of the 2 and 3 degree. Preventive measures for SPSs should include the use of equipment for cleaning the air of working zone, having a combined odourremoving and microbicidal action; the automation of the labor process; the installation of additional equipment for filtering air circulating in workplaces and emitting into the atmosphere; provision of sealing equipment with the use of noise insulating materials.
High level radioactive waste vitrification process equipment component testing
NASA Astrophysics Data System (ADS)
Siemens, D. H.; Health, W. C.; Larson, D. E.; Craig, S. N.; Berger, D. N.; Goles, R. W.
1985-04-01
Remote operability and maintainability of vitrification equipment were assessment under shielded cell conditions. The equipment tested will be applied to immobilize high level and transuranic liquid waste slurries that resulted from plutonium production for defense weapons. Equipment tested included: a turntable for handling waste canisters under the melter; a removable discharge cone in the melter overflow section; a thermocouple jumper that extends into a shielded cell; remote instrument and electrical connectors; remote, mechanical, and heat transfer aspects of the melter glass overflow section; a reamer to clean out plugged nozzles in the melter top; a closed circuit camera to view the melter interior; and a device to retrieve samples of the glass product. A test was also conduucted to evaluate liquid metals for use in a liquid metal sealing system.
ERIC Educational Resources Information Center
Turkington, B. A.
This autoinstructional lesson deals with the study of the human body with emphasis on the life process of reproduction. It is a learning activity included in high school biology or health education classes. The behavioral objectives are listed and the equipment and materials needed to help the student gain these objectives are also included in the…
Efficiency improvement of technological preparation of power equipment manufacturing
NASA Astrophysics Data System (ADS)
Milukov, I. A.; Rogalev, A. N.; Sokolov, V. P.; Shevchenko, I. V.
2017-11-01
Competitiveness of power equipment primarily depends on speeding-up the development and mastering of new equipment samples and technologies, enhancement of organisation and management of design, manufacturing and operation. Actual political, technological and economic conditions cause the acute need in changing the strategy and tactics of process planning. At that the issues of maintenance of equipment with simultaneous improvement of its efficiency and compatibility to domestically produced components are considering. In order to solve these problems, using the systems of computer-aided process planning for process design at all stages of power equipment life cycle is economically viable. Computer-aided process planning is developed for the purpose of improvement of process planning by using mathematical methods and optimisation of design and management processes on the basis of CALS technologies, which allows for simultaneous process design, process planning organisation and management based on mathematical and physical modelling of interrelated design objects and production system. An integration of computer-aided systems providing the interaction of informative and material processes at all stages of product life cycle is proposed as effective solution to the challenges in new equipment design and process planning.
Procurement of a fully licensed radioisotope thermoelectric generator transportation system
NASA Astrophysics Data System (ADS)
Adkins, Harold E.; Bearden, Thomas E.
The present transportation system for radioisotope thermoelectric generators and heater units is being developed to comply with all applicable U.S. DOT regulations, including a doubly-contained 'bell jar' concept for the required double-containment of plutonium. Modifications in handling equipment and procedures are entailed by this novel packaging design, and will affect high-capacity forklifts, overhead cranes, He-backfilling equipment, etc. Attention is given to the design constraints involved, and to the Federal procurement process.
Accommodation requirements for microgravity science and applications research on space station
NASA Technical Reports Server (NTRS)
Uhran, M. L.; Holland, L. R.; Wear, W. O.
1985-01-01
Scientific research conducted in the microgravity environment of space represents a unique opportunity to explore and exploit the benefits of materials processing in the virtual abscence of gravity induced forces. NASA has initiated the preliminary design of a permanently manned space station that will support technological advances in process science and stimulate the development of new and improved materials having applications across the commercial spectrum. A study is performed to define from the researchers' perspective, the requirements for laboratory equipment to accommodate microgravity experiments on the space station. The accommodation requirements focus on the microgravity science disciplines including combustion science, electronic materials, metals and alloys, fluids and transport phenomena, glasses and ceramics, and polymer science. User requirements have been identified in eleven research classes, each of which contain an envelope of functional requirements for related experiments having similar characteristics, objectives, and equipment needs. Based on these functional requirements seventeen items of experiment apparatus and twenty items of core supporting equipment have been defined which represent currently identified equipment requirements for a pressurized laboratory module at the initial operating capability of the NASA space station.
Composition of plastics from waste electrical and electronic equipment (WEEE) by direct sampling.
Martinho, Graça; Pires, Ana; Saraiva, Luanha; Ribeiro, Rita
2012-06-01
This paper describes a direct analysis study carried out in a recycling unit for waste electrical and electronic equipment (WEEE) in Portugal to characterize the plastic constituents of WEEE. Approximately 3400 items, including cooling appliances, small WEEE, printers, copying equipment, central processing units, cathode ray tube (CRT) monitors and CRT televisions were characterized, with the analysis finding around 6000 kg of plastics with several polymer types. The most common polymers are polystyrene, acrylonitrile-butadiene-styrene, polycarbonate blends, high-impact polystyrene and polypropylene. Additives to darken color are common contaminants in these plastics when used in CRT televisions and small WEEE. These additives can make plastic identification difficult, along with missing polymer identification and flame retardant identification marks. These drawbacks contribute to the inefficiency of manual dismantling of WEEE, which is the typical recycling process in Portugal. The information found here can be used to set a baseline for the plastics recycling industry and provide information for ecodesign in electrical and electronic equipment production. Copyright © 2012 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Guzman-Leong, Consuelo E.; Bredt, Ofelia P.; Burns, Carolyn A.
2009-12-04
Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed and constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.”(a) The PEP, located in the Process Engineering Laboratory-West (PDLW) located in Richland, Washington, is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes.more » The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.« less
Analysis of flight equipment purchasing practices of representative air carriers
NASA Technical Reports Server (NTRS)
1977-01-01
The process through which representative air carriers decide whether or not to purchase flight equipment was investigated as well as their practices and policies in retiring surplus aircraft. An analysis of the flight equipment investment decision process in ten airlines shows that for the airline industry as a whole, the flight equipment investment decision is in a state of transition from a wholly informal process in earliest years to a much more organized and structured process in the future. Individual air carriers are in different stages with respect to the formality and sophistication associated with the flight equipment investment decision.
Pervaporation process and assembly
Wynn, Nicholas P.; Huang, Yu; Aldajani, Tiem; Fulton, Donald A.
2010-07-20
The invention is a pervaporation process and pervaporation equipment, using a series of membrane modules, and including inter-module reheating of the feed solution under treatment. The inter-module heating is achieved within the tube or vessel in which the modules are housed, thereby avoiding the need to repeatedly extract the feed solution from the membrane module train.
Puerto Rico's PLATO Learning Program: An Independent Evaluation of the PLATO Learning Model
ERIC Educational Resources Information Center
Shillady, Lucinda; Miller, Libbie
2004-01-01
The Comprehensive School Reform (CSR) program has become a valuable resource in the implementation of the Puerto Rico Department of Education's educational reform process. To support the process, the Commonwealth of Puerto Rico granted computerized equipment, reading and mathematics software and training designed for schools. This included reading…
NASA Technical Reports Server (NTRS)
Chamberlain, R. G.; Aster, R. W.; Firnett, P. J.; Miller, M. A.
1985-01-01
Improved Price Estimation Guidelines, IPEG4, program provides comparatively simple, yet relatively accurate estimate of price of manufactured product. IPEG4 processes user supplied input data to determine estimate of price per unit of production. Input data include equipment cost, space required, labor cost, materials and supplies cost, utility expenses, and production volume on industry wide or process wide basis.
Using the Internet and Computer Technologies in Learning/Teaching Process
ERIC Educational Resources Information Center
Geladze, Darejan
2015-01-01
According to the new national curriculum innovations are in a successful outcome for the introduction of many factors, the most important things are learning environment, which includes the suitable equipment, place, space utilization, and the selection of learning resources to support teaching and learning problem solving process, by creating the…
CAPABILITY TO RECOVER PLUTONIUM-238 IN H-CANYON/HB-LINE
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fuller, Kenneth S. Jr.; Smith, Robert H. Jr.; Goergen, Charles R.
2013-01-09
Plutonium-238 is used in Radioisotope Thermoelectric Generators (RTGs) to generate electrical power and in Radioisotope Heater Units (RHUs) to produce heat for electronics and environmental control for deep space missions. The domestic supply of Pu-238 consists of scrap material from previous mission production or material purchased from Russia. Currently, the United States has no significant production scale operational capability to produce and separate new Pu-238 from irradiated neptunium-237 targets. The Department of Energy - Nuclear Energy is currently evaluating and developing plans to reconstitute the United States capability to produce Pu-238 from irradiated Np-237 targets. The Savannah River Site hadmore » previously produced and/or processed all the Pu-238 utilized in Radioisotope Thermoelectric Generators (RTGs) for deep space missions up to and including the majority of the plutonium for the Cassini Mission. The previous full production cycle capabilities included: Np-237 target fabrication, target irradiation, target dissolution and Np-237 and Pu-238 separation and purification, conversion of Np-237 and Pu-238 to oxide, scrap recovery, and Pu-238 encapsulation. The capability and equipment still exist and could be revitalized or put back into service to recover and purify Pu-238/Np-237 or broken General Purpose Heat Source (GPHS) pellets utilizing existing process equipment in HB-Line Scrap Recovery, and H-anyon Frame Waste Recovery processes. The conversion of Np-237 and Pu-238 to oxide can be performed in the existing HB-Line Phase-2 and Phase-3 Processes. Dissolution of irradiated Np-237 target material, and separation and purification of Np-237 and Pu-238 product streams would be possible at production rates of ~ 2 kg/month of Pu-238 if the existing H-Canyon Frames Process spare equipment were re-installed. Previously, the primary H-Canyon Frames equipment was removed to be replaced: however, the replacement project was stopped. The spare equipment is stored and still available for installation. Out of specification Pu-238 scrap material can be purified and recovered by utilizing the HB-Line Phase-1 Scrap Recovery Line and the Phase-3 Pu-238 Oxide Conversion Line along with H-Canyon Frame Waste Recovery process. In addition, it also covers and describes utilizing the Phase-2 Np-237 Oxide Conversion Line, in conjunction with the H-Canyon Frames Process to restore the H-Canyon capability to process and recover Np-237 and Pu-238 from irradiated Np-237 targets and address potential synergies with other programs like recovery of Pu-244 and heavy isotopes of curium from other target material.« less
In vitro motility evaluation of aggregated cancer cells by means of automatic image processing.
De Hauwer, C; Darro, F; Camby, I; Kiss, R; Van Ham, P; Decaesteker, C
1999-05-01
Set up of an automatic image processing based method that enables the motility of in vitro aggregated cells to be evaluated for a number of hours. Our biological model included the PC-3 human prostate cancer cell line growing as a monolayer on the bottom of Falcon plastic dishes containing conventional culture media. Our equipment consisted of an incubator, an inverted phase contrast microscope, a Charge Coupled Device (CCD) video camera, and a computer equipped with an image processing software developed in our laboratory. This computer-assisted microscope analysis of aggregated cells enables global cluster motility to be evaluated. This analysis also enables the trajectory of each cell to be isolated and parametrized within a given cluster or, indeed, the trajectories of individual cells outside a cluster. The results show that motility inside a PC-3 cluster is not restricted to slight motion due to cluster expansion, but rather consists of a marked cell movement within the cluster. The proposed equipment enables in vitro aggregated cell motility to be studied. This method can, therefore, be used in pharmacological studies in order to select anti-motility related compounds. The compounds selected by the equipment described could then be tested in vivo as potential anti-metastatic.
40 CFR 52.385 - EPA-approved Connecticut regulations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Defines TSP RACT for fuel burning equipment and process sources including cupolas, foundries, and hot mix... Corticelli Thread Company. 5/28/86 2/17/88 51 FR 4621 (c) 41 Effective date clarification for Connecticut...
SOLVENT WASTE REDUCTION ALTERNATIVES
This publication contains edited versions of presentations on this subject made at five Technology Transfer seminars in 1988. Chapters are included on land disposal regulations and requirements; waste solvent disposal alternatives from various industries such as process equipment...
ERIC Educational Resources Information Center
Musgrave, Chuck; Spencer-Workman, Sarah
2000-01-01
Provides a nine-step process in designing athletic facility laundry rooms that are attractive and functional. Steps include determining the level of laundry services needed, ensuring adequate storage and compatible delivery systems, selecting laundry equipment, and choosing suitable flooring. (GR)
Decontamination of minimally invasive surgical endoscopes and accessories.
Ayliffe, G
2000-08-01
(1) Infections following invasive endoscopy are rare and are usually of endogenous origin. Nevertheless, infections do occur due to inadequate cleaning and disinfection and the use of contaminated rinse water and processing equipment. (2) Rigid and flexible operative endoscopes and accessories should be thoroughly cleaned and preferably sterilized using properly validated processes. (3) Heat tolerant operative endoscopes and accessories should be sterilized using a vacuum assisted steam sterilizer. Use autoclavable instrument trays or containers to protect equipment during transit and processing. Small bench top sterilizers without vacuum assisted air removal are unsuitable for packaged and lumened devices. (4) Heat sensitive rigid and flexible endoscopes and accessories should preferably be sterilized using ethylene oxide, low temperature steam and formaldehyde (rigid only) or gas plasma (if appropriate). (5) If there are insufficient instruments or time to sterilize invasive endoscopes, or if no suitable method is available locally, they may be disinfected by immersion in 2% glutaraldehyde or a suitable alternative. An immersion time of at least 10 min should be adopted for glutaraldehyde. This is sufficient to inactivate most vegetative bacteria and viruses including HIV and hepatitis B virus (HBV). Longer contact times of 20 min or more may be necessary if a mycobacterial infection is known or suspected. At least 3 h immersion in glutaraldehyde is required to kill spores. (6) Glutaraldehyde is irritant and sensitizing to the skin, eyes and respiratory tract. Measures must be taken to ensure glutaraldehyde is used in a safe manner, i.e., total containment and/or extraction of harmful vapour and the provision of suitable personal protective equipment, i.e., gloves, apron and eye protection if splashing could occur. Health surveillance of staff is recommended and should include a pre-employment enquiry regarding asthma, skin and mucosal sensitivity problems and lung function testing by spirometry. (7) Possible alternative disinfectants to glutaraldehyde include peracetic acid (0.2-0.35%), chlorine dioxide (700-1100 ppm) and superoxidized water. These are very effective, killing vegetative bacteria, including mycobacteria, and viruses in 5 min and bacterial spores in 10 min. An endorsement of compatibility with endoscopes, accessories and processing equipment is required from both the solution/device manufacturer and the endoscope manufacturer. Other important considerations are stability, cost and safety from the user and environmental standpoints. (8) Cleaning and disinfection or sterilization should be undertaken by trained staff in a dedicated area, e.g., SSD or TSSU. A suitable training programme is described. (9) If endoscopes are processed by immersion in disinfectants, harmful residues must be removed by thorough rinsing. Sterile or bacteria free water is essential for rinsing all invasive endoscopes and accessories to prevent recontamination. (10) If an automated washer disinfector is used it must be effective, non-damaging, reliable, easy to use and its performance regularly monitored. (11) If used, washer disinfectors and other processing equipment should be disinfected on a regular basis, i.e., between patients or at the start of each session. This will prevent biofilm formation and recontamination of instruments during rinsing. Disinfection should include the water treatment system, if present. (12) To comply with the Medical Devices Directive, manufacturers are obliged to provide full details on how to decontaminate the reusable devices they supply. This should include details of compatibility with heat, pressure, moisture, processing chemicals and ultrasonics. (13) The Infection Control Team should always be involved in the formulation and implementation of decontamination policies. Wherever possible, the national good practice guidelines produced by the Medical Devices Agency and/or professional societies shoul
Mushroom cultivation, processing and value added products: a patent based review.
Singhal, Somya; Rasane, Prasad; Kaur, Sawinder; Garba, Umar; Singh, Jyoti; Raj, Nishant; Gupta, Neeru
2018-06-03
Edible mushrooms are an abundant source of carbohydrates, proteins, and multiple antioxidants and phytonutrients. This paper presents a general overview on the edible fungus describing the inventions made in the field of its cultivation, equipment and value added products. To understand and review the innovations and nutraceutical benefits of mushrooms as well as to develop interest regarding the edible mushrooms. Information provided in this review is based on the available research investigations and patents. Mushrooms are an edible source of a wide variety of antioxidants and phytonutrients with a number of nutraceutical properties including anti-tumor and anti-carcinogenic. Thus, several investigations are made for cultivation and improvement of the yield of mushrooms through improvisation of growth substrates and equipment used for mushroom processing. The mushroom has been processed into various products to increase its consumption, providing the health and nutritional benefit to mankind. This paper summarizes the cultivation practices of mushroom, its processing equipments, methods of preservation, value added based products, and its nutraceutical properties. The review also highlights the various scientific feats achieved in terms of patents and research publications promoting mushroom as a wholesome food. Copyright© Bentham Science Publishers; For any queries, please email at epub@benthamscience.org.
New Materials for Electric Drive Vehicles - Final CRADA Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carter, J. David
This project was sponsored by the US DOE Global Initiatives for Proliferation Prevention. The object was for Ukrainian and US partners, including Argonne, AETC, and Dontech to develop special carbon materials and factory production equipment with the goal of making better car batteries to achieve DOE's goals for all-electric and plug-in hybrid electric vehicles. Carbon materials are used in designs for lithium-ion batteries and metal-air batteries, both leading contenders for future electric cars. Specifically, the collaborators planned to use the equipment derived from this project to develop a rechargeable battery system that will use the carbon materials produced by themore » innovative factory process equipment. The final outcome of the project was that the Ukrainian participants consisting of the Kharkov Institute of Physics and Technology (KIPT), the Institute of Gas of National Academy of Sciences of Ukraine and the Materials Research Center, Ltd. designed, built, tested and delivered 14 pieces of processing equipment for pilot scale carbon production lines at the AETC, Arlington Heights facilities. The pilot scale equipment will be used to process materials such as activated carbon, thermally expanded graphite and carbon coated nano-particles. The equipment was shipped from Ukraine to the United States and received by AETC on December 3, 2013. The equipment is on loan from Argonne, control # 6140. Plug-in hybrid electric vehicles (PHEV) and all-electric vehicles have already demostrated success in the U.S. as they begin to share the market with older hybrid electric designs. When the project was conceived, PHEV battery systems provided a ~40 mile driving range (2011 figures). DOE R&D targets increased this to >100 miles at reduced cost less than $250/kWh (2011 figures.) A 2016 Tesla model S has boasted 270 miles. The project object was to develop pilot-production line equipment for advanced hybrid battery system that achieves cycle life of 1000, an energy density of 280 Wh/kg and specific density of 600Wh/l. This project delivers factory equipment to produce these advanced battery materials.« less
Hangiandreou, Nicholas J
2003-01-01
Ultrasonography (US) has been used in medical imaging for over half a century. Current US scanners are based largely on the same basic principles used in the initial devices for human imaging. Modern equipment uses a pulse-echo approach with a brightness-mode (B-mode) display. Fundamental aspects of the B-mode imaging process include basic ultrasound physics, interactions of ultrasound with tissue, ultrasound pulse formation, scanning the ultrasound beam, and echo detection and signal processing. Recent technical innovations that have been developed to improve the performance of modern US equipment include the following: tissue harmonic imaging, spatial compound imaging, extended field of view imaging, coded pulse excitation, electronic section focusing, three-dimensional and four-dimensional imaging, and the general trend toward equipment miniaturization. US is a relatively inexpensive, portable, safe, and real-time modality, all of which make it one of the most widely used imaging modalities in medicine. Although B-mode US is sometimes referred to as a mature technology, this modality continues to experience a significant evolution in capability with even more exciting developments on the horizon. Copyright RSNA, 2003
Yaw rate control of an air bearing vehicle
NASA Technical Reports Server (NTRS)
Walcott, Bruce L.
1989-01-01
The results of a 6 week project which focused on the problem of controlling the yaw (rotational) rate the air bearing vehicle used on NASA's flat floor facility are summarized. Contained within is a listing of the equipment available for task completion and an evaluation of the suitability of this equipment. The identification (modeling) process of the air bearing vehicle is detailed as well as the subsequent closed-loop control strategy. The effectiveness of the solution is discussed and further recommendations are included.
Computing Properties Of Chemical Mixtures At Equilibrium
NASA Technical Reports Server (NTRS)
Mcbride, B. J.; Gordon, S.
1995-01-01
Scientists and engineers need data on chemical equilibrium compositions to calculate theoretical thermodynamic properties of chemical systems. Information essential in design and analysis of such equipment as compressors, turbines, nozzles, engines, shock tubes, heat exchangers, and chemical-processing equipment. CET93 is general program that calculates chemical equilibrium compositions and properties of mixtures for any chemical system for which thermodynamic data are available. Includes thermodynamic data for more than 1,300 gaseous and condensed species and thermal-transport data for 151 gases. Written in FORTRAN 77.
Hanford spent nuclear fuel hot conditioning system test procedure
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cleveland, K.J.
1997-09-16
This document provides the test procedures for cold testing of the prototype Hot Conditioning System (HCS) at the 306E Facility. The primary objective of this testing is to confirm design choices and provide data for the detailed design package prior to procurement of the process equipment. The current scope of testing in this document includes a fabricability study of the HCS, equipment performance testing of the HCS components, heat-up and cool-down cycle simulation, and robotic arm testing.
Pritchard, T J; Flanders, K J; Donnelly, C W
1995-08-01
This study was undertaken to compare the incidence of Listeria contamination of processing equipment with that of the general dairy processing environment. A total of 378 sponge samples obtained from 21 dairy plants were analyzed for Listeria using three different enrichment media. Use of extended microbiological analysis allowed us to identify 26 Listeria positive sites which would have not been identified had a single test format been employed. Eighty (80) of 378 sites (21.2%) were identified as Listeria positive. Listeria innocua was isolated from 59 of the 80 (73.8%) positive samples, L. monocytogenes was identified in 35 (43.8%) of the positive samples, and L. seeligeri was isolated from 5 (6.3%) of the Listeria positive samples. Positive equipment samples were obtained from 6 of the 21 (28.6%) plants and 19 of the 21 (90.5%) plants had positive environmental sites. Seventeen of the 215 (7.9%) samples from equipment were positive for Listeria species. Eleven of these sites, including 3 holding tanks, 2 table tops, 3 conveyor/chain systems, a pasta filata wheel, a pint milk filler and a brine pre-filter machine, were positive for L. monocytogenes. Nineteen of the 21 (90.5%) plants had positive environmental sites. Sixty-three of the 163 (41.1%) samples from environmental sites were Listeria positive and 24 were positive for L. monocytogenes. Two-tailed student t-test analysis of the mean frequencies indicated that the level of contamination was significantly higher (p < 0.001) in 'environmental' (49.7%) as opposed to 'equipment' samples (7.0%). Our study indicates that environmental contamination with Listeria does not necessarily translate into contamination of equipment within the same plant, and that greater emphasis needs to be placed on the cleaning and sanitizing of the plant environment.
Satellite services system analysis study. Volume 3: Service equipment requirements
NASA Technical Reports Server (NTRS)
1981-01-01
Service equipment mission requirements are discussed. On-orbit operations, satellite classes, and reference missions are included. Service equipment usage and requirements are considered. Equipment identification methodology is discussed. Service equipment usage is analyzed, including initial launch, revisit, Earth return, and orbital storage. A summary of service requirements and equipment is presented, including service equipment status, even interaction, satellite features, and observations.
Component-Level Electronic-Assembly Repair (CLEAR) System Architecture
NASA Technical Reports Server (NTRS)
Oeftering, Richard C.; Bradish, Martin A.; Juergens, Jeffrey R.; Lewis, Michael J.; Vrnak, Daniel R.
2011-01-01
This document captures the system architecture for a Component-Level Electronic-Assembly Repair (CLEAR) capability needed for electronics maintenance and repair of the Constellation Program (CxP). CLEAR is intended to improve flight system supportability and reduce the mass of spares required to maintain the electronics of human rated spacecraft on long duration missions. By necessity it allows the crew to make repairs that would otherwise be performed by Earth based repair depots. Because of practical knowledge and skill limitations of small spaceflight crews they must be augmented by Earth based support crews and automated repair equipment. This system architecture covers the complete system from ground-user to flight hardware and flight crew and defines an Earth segment and a Space segment. The Earth Segment involves database management, operational planning, and remote equipment programming and validation processes. The Space Segment involves the automated diagnostic, test and repair equipment required for a complete repair process. This document defines three major subsystems including, tele-operations that links the flight hardware to ground support, highly reconfigurable diagnostics and test instruments, and a CLEAR Repair Apparatus that automates the physical repair process.
Use of Flowtran Simulation in Education
ERIC Educational Resources Information Center
Clark, J. Peter; Sommerfeld, Jude T.
1976-01-01
Describes the use in chemical engineering education of FLOWTRAN, a large steady-state simulator of chemical processes with extensive facilities for physical and thermodynamic data-handling and a large library of equipment modules, including cost estimation capability. (MLH)
40 CFR 52.385 - EPA-approved Connecticut regulations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... equipment and process sources including cupolas, foundries, and hot mix asphalt plants. 22a-174-19 Control... Corticelli Thread Company. 5/28/86 2/17/88 51 FR 4621 (c) 41 Effective date clarification for Connecticut...
40 CFR 52.385 - EPA-approved Connecticut regulations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... equipment and process sources including cupolas, foundries, and hot mix asphalt plants. 22a-174-19 Control... Corticelli Thread Company. 5/28/86 2/17/88 51 FR 4621 (c) 41 Effective date clarification for Connecticut...
40 CFR 52.385 - EPA-approved Connecticut regulations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... equipment and process sources including cupolas, foundries, and hot mix asphalt plants. 22a-174-19 Control... Corticelli Thread Company. 5/28/86 2/17/88 51 FR 4621 (c) 41 Effective date clarification for Connecticut...
40 CFR 52.385 - EPA-approved Connecticut regulations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... equipment and process sources including cupolas, foundries, and hot mix asphalt plants. 22a-174-19 Control... Corticelli Thread Company. 5/28/86 2/17/88 51 FR 4621 (c) 41 Effective date clarification for Connecticut...
40 CFR 1068.20 - May EPA enter my facilities for inspections?
Code of Federal Regulations, 2010 CFR
2010-07-01
..., manufacturing processes, storage facilities (including port facilities for imported engines and equipment or... inspect if we learn that local law prohibits it, but we may suspend your certificate if we are not allowed...
Zone radiometer measurements on a model rocket exhaust plume
NASA Technical Reports Server (NTRS)
1972-01-01
Radiometer for analytical prediction of rocket plume-to-booster thermal radiation and convective heating is described. Applications for engine combustion analysis, incineration, and pollution control by high temperature processing are discussed. Illustrations of equipment are included.
ERIC Educational Resources Information Center
Aviation/Space, 1982
1982-01-01
Spurred by National Aeronautics and Space Administration (NASA) technological advances, a budding industry is manufacturing equipment and providing services toward better management of earth's resources. Topics discussed include image processing, multispectral photography, ground use sensor, and weather data receiver. (Author/JN)
Zero-G life support for Space Station Freedom
NASA Technical Reports Server (NTRS)
Kolodney, Matthew; Dall-Bauman, L.
1992-01-01
Optimal design of spacecraft environmental control and life support systems (ECLSS) for long duration missions requires an understanding of microgravity and its long-term influence on ECLSS performance characteristics. This understanding will require examination of the fundamental processes associated with air revitalization and water recovery in a microgravity environment. Short term testing can be performed on NASA's reduced gravity aircraft (a KC-135), but longer tests will need to be conducted on the shuttle or Space Station Freedom. Conceptual designs have been prepared for ECLSS test beds that will allow extended testing of equipment under microgravity conditions. Separate designs have been formulated for air revitalization and water recovery test beds. In order to allow testing of a variety of hardware with minimal alteration of the beds themselves, the designs include storage tanks, plumbing, and limited instrumentation that would be expected to be common to all air (or water) treatment equipment of interest. In the interest of minimizing spacecraft/test bed interface requirements, the beds are designed to recycle process fluids to the greatest extent possible. In most cases, only cooling water and power interfaces are required. A volume equal to that of two SSF lockers was allowed for each design. These bed dimensions would limit testing to equipment with a 0.5- to 1.5-person-equivalent throughput. The mass, volume, and power requirements for the air revitalization test bed are estimated at 125-280 kg, 1.0- 1.4 cubic meters, and 170 min 1070 W. Corresponding ranges for the water recovery test bed are 325-375 kg, 1.0- 1.1 cubic meters, and 350-850 W. These figures include individual test articles and accompanying hardware as well as the tanks, plumbing, and instrumentation included in the bed designs. Process fluid weight (i.e., water weight) is also included.
Submerged arc welding of heavy plate
NASA Technical Reports Server (NTRS)
Wilson, R. A.
1972-01-01
The submerged arc process is particularly suitable for heavy plate welding because of its ability to combine very high deposit rates along with excellent quality. It does these things without the smoke and spatter often accompanying other processes. It is available today in several forms that are pointed to the fabricators of heavy sections with long, short or round about welds. Tandem arc full automatic equipment is particularly suitable for those long heavy welds where speed and deposit rate are of the first order. An attachment called long stick-out which makes use of the IR drop on long electrode extensions can be included on this equipment to increase deposition rates 50% or more.
Evaluation of Consumer Health Training and Education Programs.
ERIC Educational Resources Information Center
Kellogg, Muriel; And Others
PL89-749, passed in 1966, included a number of provisions for increasing participation of consumers in the improvement of the health care delivery system, including development of training programs to equip consumers for participation in the health planning process. The evaluation attempts to ascertain the direct effect of training programs on…
Automation Challenges of the 80's: What to Do until Your Integrated Library System Arrives.
ERIC Educational Resources Information Center
Allan, Ferne C.; Shields, Joyce M.
1986-01-01
A medium-sized aerospace library has developed interim solutions to automation needs by using software and equipment that were available in-house in preparation for an expected integrated library system. Automated processes include authors' file of items authored by employees, journal routing (including routing slips), statistics, journal…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-17
... critical use included ``processed food, cheese, herbs and spices, and spaces and equipment in associated... inadequately justified and recommended only cheese storage facilities for consideration by the Parties as a... include only ``Members of the National Pest Management Association treating cheese storage facilities...
ELIMINATE TABOOS, OUTFIT YOUR LIBRARY IN SIX MONTHS.
ERIC Educational Resources Information Center
NEWMAN, MAYRELEE
DURING A 6-MONTH PERIOD, EL CENTRO JUNIOR COLLEGE, DALLAS, TEXAS, ESTABLISHED A LEARNING RESOURCES LIBRARY FOR A 2,000-STUDENT POPULATION IN A FORMER DEPARTMENT STORE. THE TASK INCLUDED THREE GROUPS OF ACTIVITIES--(1) FACILITY PLANNING AND OBTAINING FURNITURE AND EQUIPMENT, (2) ACQUISITION AND PROCESSING OF A BASIC COLLECTION, INCLUDING PRINTED…
NASA Astrophysics Data System (ADS)
Clark, T. L.; McCollum, M. B.; Trout, D. H.; Javor, K.
1995-06-01
The purpose of the MEDIC Handbook is to provide practical and helpful information in the design of electrical equipment for electromagnetic compatibility (EMS). Included is the definition of electromagnetic interference (EMI) terms and units as well as an explanation of the basic EMI interactions. An overview of typical NASA EMI test requirements and associated test setups is given. General design techniques to minimize the risk of EMI and EMI suppression techniques at the board and equipment interface levels are presented. The Handbook contains specific EMI test compliance design techniques and retrofit fixes for noncompliant equipment. Also presented are special tests that are useful in the design process or in instances of specification noncompliance.
NASA Technical Reports Server (NTRS)
Clark, T. L.; Mccollum, M. B.; Trout, D. H.; Javor, K.
1995-01-01
The purpose of the MEDIC Handbook is to provide practical and helpful information in the design of electrical equipment for electromagnetic compatibility (EMS). Included is the definition of electromagnetic interference (EMI) terms and units as well as an explanation of the basic EMI interactions. An overview of typical NASA EMI test requirements and associated test setups is given. General design techniques to minimize the risk of EMI and EMI suppression techniques at the board and equipment interface levels are presented. The Handbook contains specific EMI test compliance design techniques and retrofit fixes for noncompliant equipment. Also presented are special tests that are useful in the design process or in instances of specification noncompliance.
A 3D Model to Compute Lightning and HIRF Coupling Effects on Avionic Equipment of an Aircraft
NASA Astrophysics Data System (ADS)
Perrin, E.; Tristant, F.; Guiffaut, C.; Terrade, F.; Reineix, A.
2012-05-01
This paper describes the 3D FDTD model of an aircraft developed to compute the lightning and HIRF (High Intentity Radiated Fields) coupling effects on avionic equipment and all the wire harness associated. This virtual prototype aims at assisting the aircraft manufacturer during the lightning and HIRF certification processes. The model presented here permits to cover a frequency range from lightning spectrum to the low frequency HIRF domain, i.e. 0 to 100 MHz. Moreover, the entire aircraft, including the frame, the skin, the wire harness and the equipment are taken into account in only one model. Results obtained are compared to measurements on a real aircraft.
Brady, Michael P.; Keiser, James R.; Leonard, Donovan N.; ...
2014-11-11
Thermochemical liquifaction processing of biomass to produce bio-derived fuels (e.g. gasoline, jet fuel, diesel, home heating oil, etc.) is of great recent interest as a renewable energy source. Approaches under investigation include direct liquefaction, hydrothermal liquefaction, hydropyrolysis, fast pyrolysis, etc. to produce energy dense liquids that can be utilized as produced or further processed to provide products of higher value. An issue with bio-oils is that they tend to contain significant concentrations of organic compounds, which make the bio-oil acidic and a potential source of corrosion issues in in transport, storage, and use. Efforts devoted to modified/further processing of bio-oilsmore » to make them less corrosive are currently being widely pursued. Another aspect that must also be addressed is potential corrosion issues in the bio-oil liquefaction process equipment itself. Depending on the specific process, bio-oil liquefaction production temperatures can reach up to 400-600 °C, and involve the presence of aggressive sulfur, and halide species from both the biomass used and/or process additives. Detailed knowledge of the corrosion resistance of candidate process equipment alloys in these bio-oil production environments is currently lacking. Lastly, this paper summarizes our recent, ongoing efforts to assess the extent to which corrosion of bio-oil process equipment may be an issue, with the ultimate goal of providing the basis to select the lowest cost alloy grades capable of providing the long-term corrosion resistance needed for future bio-oil production plants.« less
Perspectives on the design of safer nanomaterials and manufacturing processes
NASA Astrophysics Data System (ADS)
Geraci, Charles; Heidel, Donna; Sayes, Christie; Hodson, Laura; Schulte, Paul; Eastlake, Adrienne; Brenner, Sara
2015-09-01
A concerted effort is being made to insert Prevention through Design principles into discussions of sustainability, occupational safety and health, and green chemistry related to nanotechnology. Prevention through Design is a set of principles, which includes solutions to design out potential hazards in nanomanufacturing including the design of nanomaterials, and strategies to eliminate exposures and minimize risks that may be related to the manufacturing processes and equipment at various stages of the lifecycle of an engineered nanomaterial.
Artificial Intelligence Tools for Scaling Up of High Shear Wet Granulation Process.
Landin, Mariana
2017-01-01
The results presented in this article demonstrate the potential of artificial intelligence tools for predicting the endpoint of the granulation process in high-speed mixer granulators of different scales from 25L to 600L. The combination of neurofuzzy logic and gene expression programing technologies allowed the modeling of the impeller power as a function of operation conditions and wet granule properties, establishing the critical variables that affect the response and obtaining a unique experimental polynomial equation (transparent model) of high predictability (R 2 > 86.78%) for all size equipment. Gene expression programing allowed the modeling of the granulation process for granulators of similar and dissimilar geometries and can be improved by implementing additional characteristics of the process, as composition variables or operation parameters (e.g., batch size, chopper speed). The principles and the methodology proposed here can be applied to understand and control manufacturing process, using any other granulation equipment, including continuous granulation processes. Copyright © 2016 American Pharmacists Association®. Published by Elsevier Inc. All rights reserved.
Tri-Service Construction Guide Specifications
1992-04-01
Equipment 11474 NN 9102 11757 Radiographic Darkroom Equipment 11476 VA 8202 11471 Revolving Darkroom Doors 11494 VA 8201 11491 Hydrotherapy Equipment...11494 NN 9102 11716 Hydrotherapy Equipment 11500 CE 9105 11500 Air Pollution Control 11500 NS 9103 13255 Cleaning for Process Piping Systems 11600 NN...Doors (11471) 4 11494 - Hydrotherapy Equipment (11491) 0 0 11500 - Air Pollution Control 0 11500 - Cleaning for Process Piping Systems (13255) 0 11600
The potential of telehealth for 'business as usual' in outpatient clinics.
Day, Karen; Kerr, Patricia
2012-04-01
A six-month pilot study was conducted to ascertain the value of using high-definition videoconferencing equipment in an outpatients' setting. The videoconferencing equipment, which included digital biometric equipment, was installed in the outpatient clinics of a remote health service in New Zealand. Use of the equipment was evaluated using action research techniques. Clinicians were interviewed about their assessment of the equipment's usefulness. Patients and their carers completed questionnaires about their clinic experience. During the pilot trial, 109 patients were seen in 25 clinics of six different specialities. Questionnaire results showed that patients and their companions had a good user experience, similar to a face-to-face appointment. Clinicians found that the large screen, sense of proximity, video clarity and definition, and lack of sound/picture lag worked well for certain types of outpatients' clinics, e.g. methadone maintenance clinics. The need for process changes made it difficult to turn telehealth into business as usual in an environment built for face-to-face appointments. We conclude that videoconference equipment has potential to become integral to outpatients' clinics.
Innovation design of medical equipment based on TRIZ.
Gao, Changqing; Guo, Leiming; Gao, Fenglan; Yang, Bo
2015-01-01
Medical equipment is closely related to personal health and safety, and this can be of concern to the equipment user. Furthermore, there is much competition among medical equipment manufacturers. Innovative design is the key to success for those enterprises. The design of medical equipment usually covers vastly different domains of knowledge. The application of modern design methodology in medical equipment and technology invention is an urgent requirement. TRIZ (Russian abbreviation of what can be translated as `theory of inventive problem solving') was born in Russia, which contain some problem-solving methods developed by patent analysis around the world, including Conflict Matrix, Substance Field Analysis, Standard Solution, Effects, etc. TRIZ is an inventive methodology for problems solving. As an Engineering example, infusion system is analyzed and re-designed by TRIZ. The innovative idea is generated to liberate the caretaker from the infusion bag watching out. The research in this paper shows the process of the application of TRIZ in medical device inventions. It is proved that TRIZ is an inventive methodology for problems solving and can be used widely in medical device development.
Choosing a Geothermal as an HVAC System.
ERIC Educational Resources Information Center
Lensenbigler, John D.
2002-01-01
Describes the process of selecting and installing geothermal water source heat pumps for new residence halls at Johnson Bible College in Knoxville, Tennessee, including choosing the type of geothermal design, contractors, and interior equipment, and cost and payback. (EV)
Market development directory for solar industrial process heat systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The purpose of this directory is to provide a basis for market development activities through a location listing of key trade associations, trade periodicals, and key firms for three target groups. Potential industrial users and potential IPH system designers were identified as the prime targets for market development activities. The bulk of the directory is a listing of these two groups. The third group, solar IPH equipment manufacturers, was included to provide an information source for potential industrial users and potential IPH system designers. Trade associates and their publications are listed for selected four-digit Standard Industrial Code (SIC) industries. Sincemore » industries requiring relatively lower temperature process heat probably will comprise most of the near-term market for solar IPH systems, the 80 SIC's included in this chapter have process temperature requirements less than 350/sup 0/F. Some key statistics and a location list of the largest plants (according to number of employees) in each state are included for 15 of the 80 SIC's. Architectural/engineering and consulting firms are listed which are known to have solar experience. Professional associated and periodicals to which information on solar IPH sytstems may be directed also are included. Solar equipment manufacturers and their associations are listed. The listing is based on the SERI Solar Energy Information Data Base (SEIDB).« less
Image acquisition device of inspection robot based on adaptive rotation regulation of polarizer
NASA Astrophysics Data System (ADS)
Dong, Maoqi; Wang, Xingguang; Liang, Tao; Yang, Guoqing; Zhang, Chuangyou; Gao, Faqin
2017-12-01
An image processing device of inspection robot with adaptive polarization adjustment is proposed, that the device includes the inspection robot body, the image collecting mechanism, the polarizer and the polarizer automatic actuating device. Where, the image acquisition mechanism is arranged at the front of the inspection robot body for collecting equipment image data in the substation. Polarizer is fixed on the automatic actuating device of polarizer, and installed in front of the image acquisition mechanism, and that the optical axis of the camera vertically goes through the polarizer and the polarizer rotates with the optical axis of the visible camera as the central axis. The simulation results show that the system solves the fuzzy problems of the equipment that are caused by glare, reflection of light and shadow, and the robot can observe details of the running status of electrical equipment. And the full coverage of the substation equipment inspection robot observation target is achieved, which ensures the safe operation of the substation equipment.
Intentional defect array wafers: their practical use in semiconductor control and monitoring systems
NASA Astrophysics Data System (ADS)
Emami, Iraj; McIntyre, Michael; Retersdorf, Michael
2003-07-01
In the competitive world of semiconductor manufacturing today, control of the process and manufacturing equipment is paramount to success of the business. Consistent with the need for rapid development of process technology, is a need for development wiht respect to equipment control including defect metrology tools. Historical control methods for defect metrology tools included a raw count of defects detected on a characterized production or test wafer with little or not regard to the attributes of the detected defects. Over time, these characterized wafers degrade with multiple passes on the tools and handling requiring the tool owner to create and characterize new samples periodically. With the complex engineering software analysis systems used today, there is a strong reliance on the accuracy of defect size, location, and classification in order to provide the best value when correlating the in line to sort type of data. Intentional Defect Array (IDA) wafers were designed and manufacturered at International Sematech (ISMT) in Austin, Texas and is a product of collaboration between ISMT member companies and suppliers of advanced defect inspection equipment. These wafers provide the use with known defect types and sizes in predetermined locations across the entire wafer. The wafers are designed to incorporate several desired flows and use critical dimensions consistent with current and future technology nodes. This paper briefly describes the design of the IDA wafer and details many practical applications in the control of advanced defect inspection equipment.
Weather satellite picture receiving stations, APT digital scan converter
NASA Technical Reports Server (NTRS)
Vermillion, C. H.; Kamowski, J. C.
1975-01-01
The automatic picture transmission digital scan converter is used at ground stations to convert signals received from scanning radiometers to data compatible with ground equipment designed to receive signals from vidicons aboard operational meteorological satellites. Information necessary to understand the circuit theory, functional operation, general construction and calibration of the converter is provided. Brief and detailed descriptions of each of the individual circuits are included, accompanied by a schematic diagram contained at the end of each circuit description. Listings of integral parts and testing equipment required as well as an overall wiring diagram are included. This unit will enable the user to readily accept and process weather photographs from the operational meteorological satellites.
2008-10-01
CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-127 crew members become familiar with the payload and hardware for their mission. Here they are looking at the Experiment Logistics Module - Exposed Section, or ELM-ES, berthing mechanism, including the longeron trunnion/scuff plate, Payload Disconnect Assembly and WIF socket. The mission payload also includes the Extended Facility and the Inter Orbit Communication System Extended Facility, or ICS-EF. Equipment familiarization is part of a Crew Equipment Interface Test. The payload will be launched to the International Space Station aboard the space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Kim Shiflett
Spacelab Mission Implementation Cost Assessment (SMICA)
NASA Technical Reports Server (NTRS)
Guynes, B. V.
1984-01-01
A total savings of approximately 20 percent is attainable if: (1) mission management and ground processing schedules are compressed; (2) the equipping, staffing, and operating of the Payload Operations Control Center is revised, and (3) methods of working with experiment developers are changed. The development of a new mission implementation technique, which includes mission definition, experiment development, and mission integration/operations, is examined. The Payload Operations Control Center is to relocate and utilize new computer equipment to produce cost savings. Methods of reducing costs by minimizing the Spacelab and payload processing time during pre- and post-mission operation at KSC are analyzed. The changes required to reduce costs in the analytical integration process are studied. The influence of time, requirements accountability, and risk on costs is discussed. Recommendation for cost reductions developed by the Spacelab Mission Implementation Cost Assessment study are listed.
Expert system prototype developments for NASA-KSC business and engineering applications
NASA Technical Reports Server (NTRS)
Ragusa, James M.; Gonzalez, Avelino J.
1988-01-01
Prototype expert systems developed for a variety of NASA projects in the business/management and engineering domains are discussed. Business-related problems addressed include an assistant for simulating launch vehicle processing, a plan advisor for the acquisition of automated data processing equipment, and an expert system for the identification of customer requirements. Engineering problems treated include an expert system for detecting potential ignition sources in LOX and gaseous-oxygen transportation systems and an expert system for hazardous-gas detection.
1998-09-02
Around a table in Orbiter Processing Facility Bay 2 , STS-95 crew members look over equipment during the Crew Equipment Interface Test (CEIT) for their mission. From left, they are Mission Specialist Pedro Duque, of the European Space Agency; Payload Specialist Chiaki Mukai, of the National Space Development Agency of Japan (NASDA); Mission Specialist Scott E. Parazynski, M.D.; Pilot Steven W. Lindsey; Payload Specialist John H. Glenn Jr., senator from Ohio; Mission Specialist Stephen K. Robinson; and Mission Commander Curtis L. Brown Jr. Behind them is Adam Flagan, United Space Alliance-Houston. The CEIT gives astronauts an opportunity for a hands-on look at the payloads and equipment with which they will be working on orbit. The launch of the STS-95 mission, aboard Space Shuttle Discovery, is scheduled for Oct. 29, 1998. The mission includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process
ERIC Educational Resources Information Center
Arasmith, E. E.
This lesson is the first of a two-part series on anaerobic digestion. Topics discussed include the five basic functions of an anaerobic digester, basic theory of the biological processes involved, basic equipment necessary for digestion, and the products of digestion. The lesson includes an instructor's guide and student workbook. The instructor's…
Investigate zero-stress replicated optics
NASA Technical Reports Server (NTRS)
Engelhaupt, Darell; Rood, Robert
1993-01-01
The contracted activities for the procurement of 'Investigate Zero-Stress Replicated Optics' to support the AXAF-S x-ray spectrometer mirrors has been completed. To date four large Wolter I grazing incidence x-ray optical shells have been electroformed from nickel. The mirrors were fabricated utilizing each of two nickel alloy plated aluminum substrates twice. A wide variety of testing has been completed by NASA MSFC and UAH. This testing includes heat treatment control tests, subscale plating and fixture testing, alloy control of the electroless nickel, adhesion and release testing of the gold to electroless nickel, electroforming instrumentation and software and fabrication of subscale models. The full scale shells are one millimeter thick nickel electrodeposited over a thin gold layer which in turn has the optical surface on the inside. The optical surface is the replicate of the surface prepared on the substrate. Appendix I briefly outlines the fabrication process. Major objectives which were shared by UAH and MSFC include the design of facilities, equipment and tooling and procurement of materials and equipment. Process development followed with the fabrication of small scale pilot units. Procurement commenced immediately and equipment and materials were ordered to implement the fabrication of first surface full scale substrates (mandrels) and the second surface electroformed optical components. All principal objectives have been achieved. Inspection of the mirrors in visible and x-ray modes validates that the required performance and the quality can be achieved by an electroforming replication process. A very distinct progressive improvement has been achieved with each of the four mirrors produced. The final mirror exceeded the original goals and set an improved standard for flight hardware. The future goal of a 30 arc second resolution at 8 KEV x-ray appears to be achievable by this process when proper cleanliness and process control is utilized.
Glossary of Motion Picture Terminology.
ERIC Educational Resources Information Center
Jordan, Thurston C., Jr., Ed.
Over 500 terms used in the film industry are defined in non-technical language. The terms include both technical and common names for equipment, processes, occupations, and organizations. Some of the terms are illustrated with photographs. Cross Referencing is provided where appropriate. (JY)
21 CFR 892.1715 - Full-field digital mammography system.
Code of Federal Regulations, 2012 CFR
2012-04-01
... planar digital x-ray images of the entire breast. This generic type of device may include digital mammography acquisition software, full-field digital image receptor, acquisition workstation, automatic exposure control, image processing and reconstruction programs, patient and equipment supports, component...
21 CFR 892.1715 - Full-field digital mammography system.
Code of Federal Regulations, 2013 CFR
2013-04-01
... planar digital x-ray images of the entire breast. This generic type of device may include digital mammography acquisition software, full-field digital image receptor, acquisition workstation, automatic exposure control, image processing and reconstruction programs, patient and equipment supports, component...
21 CFR 892.1715 - Full-field digital mammography system.
Code of Federal Regulations, 2014 CFR
2014-04-01
... planar digital x-ray images of the entire breast. This generic type of device may include digital mammography acquisition software, full-field digital image receptor, acquisition workstation, automatic exposure control, image processing and reconstruction programs, patient and equipment supports, component...
21 CFR 892.1715 - Full-field digital mammography system.
Code of Federal Regulations, 2011 CFR
2011-04-01
... planar digital x-ray images of the entire breast. This generic type of device may include digital mammography acquisition software, full-field digital image receptor, acquisition workstation, automatic exposure control, image processing and reconstruction programs, patient and equipment supports, component...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
Monolayer boron-aluminum compacted sheet material
NASA Technical Reports Server (NTRS)
Sumner, E. V.
1973-01-01
The manufacturing techniques, basic materials used, and equipment required to produce monolayer boron-aluminum composites are described. Tentative materials and process specifications are included. Improvements in bonding and filament spacing obtained through use of brazing powder in the fugitive binder are discussed.
The Early Development of Programmable Machinery.
ERIC Educational Resources Information Center
Collins, Martin D.
1985-01-01
Programmable equipment innovations, precursors of today's technology, are examined, including the development of the binary code and feedback control systems, such as temperature sensing devices, interchangeable parts, punched cards carrying instructions, continuous flow oil refining process, assembly lines for mass production, and the…
ERIC Educational Resources Information Center
Terry, John
1987-01-01
Discusses the feasibility of using fermenters in secondary school laboratories. Includes discussions of equipment, safety, and computer interfacing. Describes how a simple fermenter could be used to simulate large-scale processes. Concludes that, although teachers and technicians will require additional training, the prospects for biotechnology in…
40 CFR 63.11395 - What are the standards and compliance requirements for existing sources?
Code of Federal Regulations, 2013 CFR
2013-07-01
... routine and long-term maintenance) and continuous monitoring system. (4) A list of operating parameters... polymerization process equipment and monomer recovery process equipment and convey the collected gas stream.... (2) 0.05 lb/hr of AN from the control device for monomer recovery process equipment. (3) If you do...
40 CFR 63.11395 - What are the standards and compliance requirements for existing sources?
Code of Federal Regulations, 2012 CFR
2012-07-01
... routine and long-term maintenance) and continuous monitoring system. (4) A list of operating parameters... polymerization process equipment and monomer recovery process equipment and convey the collected gas stream.... (2) 0.05 lb/hr of AN from the control device for monomer recovery process equipment. (3) If you do...
40 CFR 63.11395 - What are the standards and compliance requirements for existing sources?
Code of Federal Regulations, 2014 CFR
2014-07-01
... routine and long-term maintenance) and continuous monitoring system. (4) A list of operating parameters... polymerization process equipment and monomer recovery process equipment and convey the collected gas stream.... (2) 0.05 lb/hr of AN from the control device for monomer recovery process equipment. (3) If you do...
Listing of Food Service Equipment.
ERIC Educational Resources Information Center
National Sanitation Foundation, Ann Arbor, MI. Testing Lab.
A comprehensive listing of food service equipment including--(1) companies authorized to use the National Sanitation Foundation seal of approval, and (2) equipment listed as meeting NSF standards including soda fountains, spray-type dishwashers, dishwashing equipment, cooking equipment, commerical cooking and warming equipment, freezers,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Korsah, K.; Wood, R.T.; Hassan, M.
This document presents the results of studies sponsored by the Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. The studies were conducted by Oak Ridge National Laboratory (ORNL), Sandia National Laboratories (SNL), and Brookhaven National Laboratory (BNL). The studies address the following: (1) adequacy of the present test methods for qualification of digital I and C systems; (2) preferred (i.e., Regulatory Guide-endorsed) standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging for equipment to be locatedmore » in a benign environment; and (5) determination of an appropriate approach for addressing the impact of smoke in digital equipment qualification programs. Significant findings from the studies form the technical basis for a recommended approach to the environmental qualification of microprocessor-based safety-related equipment in nuclear power plants.« less
Mingguang, Zhang; Juncheng, Jiang
2008-10-30
Overpressure is one important cause of domino effect in accidents of chemical process equipments. Damage probability and relative threshold value are two necessary parameters in QRA of this phenomenon. Some simple models had been proposed based on scarce data or oversimplified assumption. Hence, more data about damage to chemical process equipments were gathered and analyzed, a quantitative relationship between damage probability and damage degrees of equipment was built, and reliable probit models were developed associated to specific category of chemical process equipments. Finally, the improvements of present models were evidenced through comparison with other models in literatures, taking into account such parameters: consistency between models and data, depth of quantitativeness in QRA.
EnergySolution's Clive Disposal Facility Operational Research Model - 13475
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nissley, Paul; Berry, Joanne
2013-07-01
EnergySolutions owns and operates a licensed, commercial low-level radioactive waste disposal facility located in Clive, Utah. The Clive site receives low-level radioactive waste from various locations within the United States via bulk truck, containerised truck, enclosed truck, bulk rail-cars, rail boxcars, and rail inter-modals. Waste packages are unloaded, characterized, processed, and disposed of at the Clive site. Examples of low-level radioactive waste arriving at Clive include, but are not limited to, contaminated soil/debris, spent nuclear power plant components, and medical waste. Generators of low-level radioactive waste typically include nuclear power plants, hospitals, national laboratories, and various United States government operatedmore » waste sites. Over the past few years, poor economic conditions have significantly reduced the number of shipments to Clive. With less revenue coming in from processing shipments, Clive needed to keep its expenses down if it was going to maintain past levels of profitability. The Operational Research group of EnergySolutions were asked to develop a simulation model to help identify any improvement opportunities that would increase overall operating efficiency and reduce costs at the Clive Facility. The Clive operations research model simulates the receipt, movement, and processing requirements of shipments arriving at the facility. The model includes shipment schedules, processing times of various waste types, labor requirements, shift schedules, and site equipment availability. The Clive operations research model has been developed using the WITNESS{sup TM} process simulation software, which is developed by the Lanner Group. The major goals of this project were to: - identify processing bottlenecks that could reduce the turnaround time from shipment arrival to disposal; - evaluate the use (or idle time) of labor and equipment; - project future operational requirements under different forecasted scenarios. By identifying processing bottlenecks and unused equipment and/or labor, improvements to operating efficiency could be determined and appropriate cost saving measures implemented. Model runs forecasting various scenarios helped illustrate potential impacts of certain conditions (e.g. 20% decrease in shipments arrived), variables (e.g. 20% decrease in labor), or other possible situations. (authors)« less
Improvements to the Processing and Characterization of Needled Composite Laminates
2014-01-01
the automated processing equipment are shown and discussed. The modifications allow better spatial control at the penetration sites and the ability... automated processing equipment are shown and discussed. The modifications allow better spatial control at the penetration sites and the ability to...semi- automated processing equipment, commercial off-the-shelf (COTS) needles and COTS aramid mat designed for other applications. Needled material
Hee Han; Woodam Chung; Lucas Wells; Nathaniel Anderson
2018-01-01
An important task in forest residue recovery operations is to select the most cost-efficient feedstock logistics system for a given distribution of residue piles, road access, and available machinery. Notable considerations include inaccessibility of treatment units to large chip vans and frequent, long-distance mobilization of forestry equipment required to process...
Capability to Recover Plutonium-238 in H-Canyon/HB-Line - 13248
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fuller, Kenneth S. Jr.; Smith, Robert H. Jr.; Goergen, Charles R.
2013-07-01
Plutonium-238 is used in Radioisotope Thermoelectric Generators (RTGs) to generate electrical power and in Radioisotope Heater Units (RHUs) to produce heat for electronics and environmental control for deep space missions. The domestic supply of Pu-238 consists of scrap material from previous mission production or material purchased from Russia. Currently, the United States has no significant production scale operational capability to produce and separate new Pu-238 from irradiated neptunium-237 targets. The Department of Energy - Nuclear Energy is currently evaluating and developing plans to reconstitute the United States capability to produce Pu-238 from irradiated Np-237 targets. The Savannah River Site hadmore » previously produced and/or processed all the Pu-238 utilized in Radioisotope Thermoelectric Generators (RTGs) for deep space missions up to and including the majority of the plutonium for the Cassini Mission. The previous full production cycle capabilities included: Np- 237 target fabrication, target irradiation, target dissolution and Np-237 and Pu-238 separation and purification, conversion of Np-237 and Pu-238 to oxide, scrap recovery, and Pu-238 encapsulation. The capability and equipment still exist and could be revitalized or put back into service to recover and purify Pu-238/Np-237 or broken General Purpose Heat Source (GPHS) pellets utilizing existing process equipment in HB-Line Scrap Recovery, and H-Canyon Frame Waste Recovery processes. The conversion of Np-237 and Pu-238 to oxide can be performed in the existing HB-Line Phase-2 and Phase- 3 Processes. Dissolution of irradiated Np-237 target material, and separation and purification of Np-237 and Pu-238 product streams would be possible at production rates of ∼2 kg/month of Pu-238 if the existing H-Canyon Frames Process spare equipment were re-installed. Previously, the primary H-Canyon Frames equipment was removed to be replaced: however, the replacement project was stopped. The spare equipment is stored and still available for installation. Out of specification Pu-238 scrap material can be purified and recovered by utilizing the HB-Line Phase- 1 Scrap Recovery Line and the Phase-3 Pu-238 Oxide Conversion Line along with H-Canyon Frame Waste Recovery process. In addition, it also covers and describes utilizing the Phase-2 Np-237 Oxide Conversion Line, in conjunction with the H-Canyon Frames Process to restore the H-Canyon capability to process and recover Np-237 and Pu-238 from irradiated Np-237 targets and address potential synergies with other programs like recovery of Pu-244 and heavy isotopes of curium from other target material. (authors)« less
Patterning of Indium Tin Oxide Films
NASA Technical Reports Server (NTRS)
Immer, Christopher
2008-01-01
A relatively rapid, economical process has been devised for patterning a thin film of indium tin oxide (ITO) that has been deposited on a polyester film. ITO is a transparent, electrically conductive substance made from a mixture of indium oxide and tin oxide that is commonly used in touch panels, liquid-crystal and plasma display devices, gas sensors, and solar photovoltaic panels. In a typical application, the ITO film must be patterned to form electrodes, current collectors, and the like. Heretofore it has been common practice to pattern an ITO film by means of either a laser ablation process or a photolithography/etching process. The laser ablation process includes the use of expensive equipment to precisely position and focus a laser. The photolithography/etching process is time-consuming. The present process is a variant of the direct toner process an inexpensive but often highly effective process for patterning conductors for printed circuits. Relative to a conventional photolithography/ etching process, this process is simpler, takes less time, and is less expensive. This process involves equipment that costs less than $500 (at 2005 prices) and enables patterning of an ITO film in a process time of less than about a half hour.
Orbital transfer vehicle launch operations study. Volume 2: Detailed summary
NASA Technical Reports Server (NTRS)
1986-01-01
A series of Operational Design Drivers were identified. Several of these could have significant impact(s) on program costs. These recommendations, for example, include such items as: complete factory assembly and checkout prior to shipment to the ground launch site to make significant reductions in time required at the launch site as well as overall manpower required to do this work; minimize use of nonstandard equipment when orbiter provided equipment is available; and require commonality (or interchangeability) of subsystem equipment elements that are common to the space station, Orbit Maneuvering Vehicles, and/or Orbit Transfer Vehicles. Several additional items were identified that will require a significant amount of management attention (and direction) to resolve. Key elements of the space based processing plans are discussed.
Energy utilization: municipal waste incineration. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaBeck, M.F.
An assessment is made of the technical and economical feasibility of converting municipal waste into useful and useable energy. The concept presented involves retrofitting an existing municipal incinerator with the systems and equipment necessary to produce process steam and electric power. The concept is economically attractive since the cost of necessary waste heat recovery equipment is usually a comparatively small percentage of the cost of the original incinerator installation. Technical data obtained from presently operating incinerators designed specifically for generating energy, documents the technical feasibility and stipulates certain design constraints. The investigation includes a cost summary; description of process andmore » facilities; conceptual design; economic analysis; derivation of costs; itemized estimated costs; design and construction schedule; and some drawings.« less
NASA Technical Reports Server (NTRS)
Hamm, J. R.
1976-01-01
Information is presented on the design, performance, operating characteristics, cost, and development status of coal preparation equipment, combustion equipment, furnaces, low-Btu gasification processes, low-temperature carbonization processes, desulfurization processes, and pollution particulate removal equipment. The information was compiled for use by the various cycle concept leaders in determining the performance, capital costs, energy costs, and natural resource requirements of each of their system configurations.
Mathaes, Roman; Mahler, Hanns-Christian; Roggo, Yves; Huwyler, Joerg; Eder, Juergen; Fritsch, Kamila; Posset, Tobias; Mohl, Silke; Streubel, Alexander
2016-01-01
Capping equipment used in good manufacturing practice manufacturing features different designs and a variety of adjustable process parameters. The overall capping result is a complex interplay of the different capping process parameters and is insufficiently described in literature. It remains poorly studied how the different capping equipment designs and capping equipment process parameters (e.g., pre-compression force, capping plate height, turntable rotating speed) contribute to the final residual seal force of a sealed container closure system and its relation to container closure integrity and other drug product quality parameters. Stopper compression measured by computer tomography correlated to residual seal force measurements.In our studies, we used different container closure system configurations from different good manufacturing practice drug product fill & finish facilities to investigate the influence of differences in primary packaging, that is, vial size and rubber stopper design on the capping process and the capped drug product. In addition, we compared two large-scale good manufacturing practice manufacturing capping equipment and different capping equipment settings and their impact on product quality and integrity, as determined by residual seal force.The capping plate to plunger distance had a major influence on the obtained residual seal force values of a sealed vial, whereas the capping pre-compression force and the turntable rotation speed showed only a minor influence on the residual seal force of a sealed vial. Capping process parameters could not easily be transferred from capping equipment of different manufacturers. However, the residual seal force tester did provide a valuable tool to compare capping performance of different capping equipment. No vial showed any leakage greater than 10(-8)mbar L/s as measured by a helium mass spectrometry system, suggesting that container closure integrity was warranted in the residual seal force range tested for the tested container closure systems. Capping equipment used in good manufacturing practice manufacturing features different designs and a variety of adjustable process parameters. The overall capping result is a complex interplay of the different capping process parameters and is insufficiently described in the literature. It remains poorly studied how the different capping equipment designs and capping equipment process parameters contribute to the final capping result.In this study, we used different container closure system configurations from different good manufacturing process drug product fill & finish facilities to investigate the influence of the vial size and the rubber stopper design on the capping process. In addition, we compared two examples of large-scale good manufacturing process capping equipment and different capping equipment settings and their impact on product quality and integrity, as determined by residual seal force. © PDA, Inc. 2016.
Sample selection and testing of separation processes
NASA Technical Reports Server (NTRS)
Karr, L. J.
1985-01-01
Phase partitioning, which has become an important tool for the separation and purification of biological materials, was studied. Instruments available for this technique were researched and a countercurrent distribution apparatus, the Biosheff MK2N, was purchased. Various proteins, polysaccharides and cells were studied as models to determine operating procedures and conditions for this piece of equipment. Results were compared with those obtained from other similar equipment, including a nonsynchronous coil planet centrifuge device. Additionally, work was done with affinity ligands attached to PEG, which can further enhance the separation capabilities of phase partitioning.
Space Power Management and Distribution Status and Trends
NASA Technical Reports Server (NTRS)
Reppucci, G. M.; Biess, J. J.; Inouye, L.
1984-01-01
An overview of space power management and distribution (PMAD) is provided which encompasses historical and current technology trends. The PMAD components discussed include power source control, energy storage control, and load power processing electronic equipment. The status of distribution equipment comprised of rotary joints and power switchgear is evaluated based on power level trends in the public, military, and commercial sectors. Component level technology thrusts, as driven by perceived system level trends, are compared to technology status of piece-parts such as power semiconductors, capacitors, and magnetics to determine critical barriers.
STS-113 Mission Specialists review data on the P1 Truss
NASA Technical Reports Server (NTRS)
2002-01-01
KENNEDY SPACE CENTER, FLA. - STS-113 Mission Specialists Michael Lopez-Alegria (left) and John Herrington (center) review data on the P1 Integrated Truss Structure with a technician in the Space Station Processing Facility. During the mission, the P1 truss will be attached to the central truss segment, S0 Truss, during spacewalks. The payload also includes the Crew and Equipment Translation Aid (CETA) Cart B that can be used by spacewalkers to move along the truss with equipment. STS-113 is scheduled to launch Oct. 6, 2002.
Deburring: an annotated bibliography. Volume V
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gillespie, L.K.
1978-01-01
An annotated summary of 204 articles and publications on burrs, burr prevention and deburring is presented. Thirty-seven deburring processes are listed. Entries cited include English, Russian, French, Japanese and German language articles. Entries are indexed by deburring processes, author, and language. Indexes also indicate which references discuss equipment and tooling, how to use a process, economics, burr properties, and how to design to minimize burr problems. Research studies are identified as are the materials deburred.
Study on processing immiscible materials in zero gravity
NASA Technical Reports Server (NTRS)
Reger, J. L.; Mendelson, R. A.
1975-01-01
An experimental investigation was conducted to evaluate mixing immiscible metal combinations under several process conditions. Under one-gravity, these included thermal processing, thermal plus electromagnetic mixing, and thermal plus acoustic mixing. The same process methods were applied during free fall on the MSFC drop tower facility. The design is included of drop tower apparatus to provide the electromagnetic and acoustic mixing equipment, and a thermal model was prepared to design the specimen and cooling procedure. Materials systems studied were Ca-La, Cd-Ga and Al-Bi; evaluation of the processed samples included the morphology and electronic property measurements. The morphology was developed using optical and scanning electron microscopy and microprobe analyses. Electronic property characterization of the superconducting transition temperatures were made using an impedance change-tuned coil method.
NASA Astrophysics Data System (ADS)
Tarasov, V. N.; Boyarkina, I. V.
2017-06-01
Analytical calculation methods of dynamic processes of the self-propelled boom hydraulic machines working equipment are more preferable in comparison with numerical methods. The analytical research method of dynamic processes of the boom hydraulic machines working equipment by means of differential equations of acceleration and braking of the working equipment is proposed. The real control law of a hydraulic distributor electric spool is considered containing the linear law of the electric spool activation and stepped law of the electric spool deactivation. Dependences of dynamic processes of the working equipment on reduced mass, stiffness of hydraulic power cylinder, viscous drag coefficient, piston acceleration, pressure in hydraulic cylinders, inertia force are obtained. Definite recommendations relative to the reduction of dynamic loads, appearing during the working equipment control are considered as the research result. The nature and rate of parameter variations of the speed and piston acceleration dynamic process depend on the law of the ports opening and closure of the hydraulic distributor electric spool. Dynamic loads in the working equipment are decreased during a smooth linear activation of the hydraulic distributor electric spool.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-01-01
Descriptions are given of 42 processes which use biomass to produce chemical products. Marketing and economic background, process description, flow sheets, costs, major equipment, and availability of technology are given for each of the 42 processes. Some of the chemicals discussed are: ethanol, ethylene, acetaldehyde, butanol, butadiene, acetone, citric acid, gluconates, itaconic acid, lactic acid, xanthan gum, sorbitol, starch polymers, fatty acids, fatty alcohols, glycerol, soap, azelaic acid, perlargonic acid, nylon-11, jojoba oil, furfural, furfural alcohol, tetrahydrofuran, cellulose polymers, products from pulping wastes, and methane. Processes include acid hydrolysis, enzymatic hydrolysis, fermentation, distillation, Purox process, and anaerobic digestion.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., threaded, socket, or compression fittings. Gaskets and thread sealants shall be suitable for hydrogen... closures. (v) Piping, tubing, and fittings. (a) Piping, tubing, and fittings and gasket and thread sealants... including process or analytical equipment. (c) Be located 25 feet from concentrations of people. (d) Be...
ERGONOMICS ABSTRACTS 48347-48982.
ERIC Educational Resources Information Center
Ministry of Technology, London (England). Warren Spring Lab.
IN THIS COLLECTION OF ERGONOMICS ABSTRACTS AND ANNOTATIONS THE FOLLOWING AREAS OF CONCERN ARE REPRESENTED--GENERAL REFERENCES, METHODS, FACILITIES, AND EQUIPMENT RELATING TO ERGONOMICS, SYSTEMS OF MAN AND MACHINES, VISUAL, AUDITORY, AND OTHER SENSORY INPUTS AND PROCESSES (INCLUDING SPEECH AND INTELLIGIBILITY), INPUT CHANNELS, BODY MEASUREMENTS,…
40 CFR 423.11 - Specialized definitions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... chemical metal cleaning waste means any wastewater resulting from the cleaning of any metal process equipment with chemical compounds, including, but not limited to, boiler tube cleaning. (d) The term metal cleaning waste means any wastewater resulting from cleaning [with or without chemical cleaning compounds...
18 CFR 367.9310 - Account 931, Rents.
Code of Federal Regulations, 2010 CFR
2010-04-01
... NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF..., including taxes, paid for the property of others used, occupied or operated in connection with service... structure, office furniture, fixtures, computers, data processing equipment, microwave and telecommunication...
18 CFR 367.9310 - Account 931, Rents.
Code of Federal Regulations, 2011 CFR
2011-04-01
... NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF..., including taxes, paid for the property of others used, occupied or operated in connection with service... structure, office furniture, fixtures, computers, data processing equipment, microwave and telecommunication...
18 CFR 367.9310 - Account 931, Rents.
Code of Federal Regulations, 2012 CFR
2012-04-01
... NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF..., including taxes, paid for the property of others used, occupied or operated in connection with service... structure, office furniture, fixtures, computers, data processing equipment, microwave and telecommunication...
18 CFR 367.9310 - Account 931, Rents.
Code of Federal Regulations, 2014 CFR
2014-04-01
... NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF..., including taxes, paid for the property of others used, occupied or operated in connection with service... structure, office furniture, fixtures, computers, data processing equipment, microwave and telecommunication...
18 CFR 367.9310 - Account 931, Rents.
Code of Federal Regulations, 2013 CFR
2013-04-01
... NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF..., including taxes, paid for the property of others used, occupied or operated in connection with service... structure, office furniture, fixtures, computers, data processing equipment, microwave and telecommunication...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-30
... process. Key components of the antitheft device will include a passive immobilizer, a warning message... feature as standard equipment. When the system is activated, the alarm will trigger if one of the doors...
40 CFR 423.11 - Specialized definitions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... chemical metal cleaning waste means any wastewater resulting from the cleaning of any metal process equipment with chemical compounds, including, but not limited to, boiler tube cleaning. (d) The term metal cleaning waste means any wastewater resulting from cleaning [with or without chemical cleaning compounds...
12 CFR 7.5006 - Data processing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... banking functions. A national bank may produce, market, or sell software that performs services or... services, facilities (including equipment, technology, and personnel), data bases, advice and access to such services, facilities, data bases and advice, for itself and for others, where the data is banking...
30 CFR 250.1910 - What safety and environmental information is required?
Code of Federal Regulations, 2013 CFR
2013-07-01
... appropriate, a simplified process flow diagram and acceptable upper and lower limits, where applicable, for items such as temperature, pressure, flow and composition; and (3) mechanical design information including, as appropriate, piping and instrument diagrams; electrical area classifications; equipment...
30 CFR 250.1910 - What safety and environmental information is required?
Code of Federal Regulations, 2012 CFR
2012-07-01
... appropriate, a simplified process flow diagram and acceptable upper and lower limits, where applicable, for items such as temperature, pressure, flow and composition; and (3) mechanical design information including, as appropriate, piping and instrument diagrams; electrical area classifications; equipment...
30 CFR 250.1910 - What safety and environmental information is required?
Code of Federal Regulations, 2014 CFR
2014-07-01
... appropriate, a simplified process flow diagram and acceptable upper and lower limits, where applicable, for items such as temperature, pressure, flow and composition; and (3) mechanical design information including, as appropriate, piping and instrument diagrams; electrical area classifications; equipment...
A Selected Bibliography on Microbiological Laboratory Design.
ERIC Educational Resources Information Center
Laboratory Design Notes, 1967
1967-01-01
Reference sources on microbiological laboratory design are cited. Subjects covered include--(1) policies and general requirements, (2) ventilated cabinets, (3) animal isolation equipment, (4) air handling, ventilation, and filtration, (5) germicidal ultraviolet irradiation, (6) aerosol test facilities, (7) process production of microorganisms, and…
High density circuit technology, part 3
NASA Technical Reports Server (NTRS)
Wade, T. E.
1982-01-01
Dry processing - both etching and deposition - and present/future trends in semiconductor technology are discussed. In addition to a description of the basic apparatus, terminology, advantages, glow discharge phenomena, gas-surface chemistries, and key operational parameters for both dry etching and plasma deposition processes, a comprehensive survey of dry processing equipment (via vendor listing) is also included. The following topics are also discussed: fine-line photolithography, low-temperature processing, packaging for dense VLSI die, the role of integrated optics, and VLSI and technology innovations.
Precision Cleaning - Path to Premier
NASA Technical Reports Server (NTRS)
Mackler, Scott E.
2008-01-01
ITT Space Systems Division s new Precision Cleaning facility provides critical cleaning and packaging of aerospace flight hardware and optical payloads to meet customer performance requirements. The Precision Cleaning Path to Premier Project was a 2007 capital project and is a key element in the approved Premier Resource Management - Integrated Supply Chain Footprint Optimization Project. Formerly precision cleaning was located offsite in a leased building. A new facility equipped with modern precision cleaning equipment including advanced process analytical technology and improved capabilities was designed and built after outsourcing solutions were investigated and found lacking in ability to meet quality specifications and schedule needs. SSD cleans parts that can range in size from a single threaded fastener all the way up to large composite structures. Materials that can be processed include optics, composites, metals and various high performance coatings. We are required to provide verification to our customers that we have met their particulate and molecular cleanliness requirements and we have that analytical capability in this new facility. The new facility footprint is approximately half the size of the former leased operation and provides double the amount of throughput. Process improvements and new cleaning equipment are projected to increase 1st pass yield from 78% to 98% avoiding $300K+/yr in rework costs. Cost avoidance of $350K/yr will result from elimination of rent, IT services, transportation, and decreased utility costs. Savings due to reduced staff expected to net $4-500K/yr.
Food equipment manufacturer takes a slice out of its scrap rate
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bernard, D.; Hannahs, J.; Carter, M.
1996-09-01
The PMI Food Equipment Group began manufacturing circular slicer knives for its commercial Hobart line of slicers in the early 1930s. The company manufacturers the only cast knife in the food industry. The cast knives offer superior edge retention and overall corrosion resistance. The slicer knives are cast in PMI`s foundry. The casting process sometimes produces shrinkage voids or gas bubbles in the knife blank. Surface discontinuities often do not appear until rough cutting or final machining, i.e., after several hours of value-added manufacturing. Knife blanks with these discontinuities were scrapped and sent back to the foundry for remelting. Tomore » scrap the knives at that point meant the cost for casting plus the value-added machining added up to a considerable amount. Weld repair allows the recovery of casting and machining expenses equal to a significant percentage of the total manufacturing cost of slicer knives. Repair costs include welding, grinding, shipping, surface finishing and material handling. Other good applications for this GMAW-P process include repair of jet engine components, rotating process industry equipment, and hardfacing of cutting tools and dies. In addition, dissimilar metals and any material that is heat treated to develop its properties such as precision investment castings are excellent applications. The low resultant distortion, elimination of postweld heat treatment and non-line-of-site welding capability solves thin wall, limited access and precision machined component repair challenges.« less
K basins sludge removal sludge pretreatment system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chang, H.L.
1997-06-12
The Spent Nuclear Fuels Program is in the process of planning activities to remove spent nuclear fuel and other materials from the 100-K Basins as a remediation effort for clean closure. The 105 K- East and K-West Basins store spent fuel, sludge, and debris. Sludge has accumulated in the 1 00 K Basins as a result of fuel oxidation and a slight amount of general debris being deposited, by settling, in the basin water. The ultimate intent in removing the sludge and fuel is to eliminate the environmental risk posed by storing fuel at the K Basins. The task formore » this project is to disposition specific constituents of sludge (metallic fuel) to produce a product stream through a pretreatment process that will meet the requirements, including a final particle size acceptable to the Tank Waste Remediation System (TWRS). The purpose of this task is to develop a preconceptual design package for the K Basin sludge pretreatment system. The process equipment/system is at a preconceptual stage, as shown in sketch ES-SNF-01 , while a more refined process system and material/energy balances are ongoing (all sketches are shown in Appendix C). Thus, the overall process and 0535 associated equipment have been conservatively selected and sized, respectively, to establish the cost basis and equipment layout as shown in sketches ES- SNF-02 through 08.« less
Beyond good intentions: lessons on equipment donation from an African hospital.
Howie, Stephen R C; Hill, Sarah E; Peel, David; Sanneh, Momodou; Njie, Malick; Hill, Philip C; Mulholland, Kim; Adegbola, Richard A
2008-01-01
In 2000, a referral hospital in the Gambia accepted a donation of oxygen concentrators to help maintain oxygen supplies. The concentrators broke down and were put into storage. A case study was done to find the reasons for the problem and to draw lessons to help improve both oxygen supplies and the success of future equipment donations. A technical assessment of the concentrators was carried out by a biomedical engineer with relevant expertise. Semi-structured interviews were undertaken with key informants, and content analysis and inductive approaches were applied to construct the history of the episode and the reasons for the failure. Interviews confirmed the importance of technical problems with the equipment. They also revealed that the donation process was flawed, and that the hospital did not have the expertise to assess or maintain the equipment. Technical assessment showed that all units had the wrong voltage and frequency, leading to overheating and breakdown. Subsequently a hospital donations committee was established to oversee the donations process. On-site biomedical engineering expertise was arranged with a nongovernmental organization (NGO) partner. Appropriate donations of medical equipment, including oxygen concentrators, can be of benefit to hospitals in resource-poor settings, but recipients and donors need to actively manage donations to ensure that the donations are beneficial. Success requires planning, technical expertise and local participation. Partners with relevant skills and resources may also be needed. In 2002, WHO produced guidelines for medical equipment donations, which address problems that might be encountered. These guidelines should be publicized and used.
Beyond good intentions: lessons on equipment donation from an African hospital
Hill, Sarah E; Peel, David; Sanneh, Momodou; Njie, Malick; Hill, Philip C; Mulholland, Kim; Adegbola, Richard A
2008-01-01
Abstract Objective In 2000, a referral hospital in the Gambia accepted a donation of oxygen concentrators to help maintain oxygen supplies. The concentrators broke down and were put into storage. A case study was done to find the reasons for the problem and to draw lessons to help improve both oxygen supplies and the success of future equipment donations. Methods A technical assessment of the concentrators was carried out by a biomedical engineer with relevant expertise. Semi-structured interviews were undertaken with key informants, and content analysis and inductive approaches were applied to construct the history of the episode and the reasons for the failure. Findings Interviews confirmed the importance of technical problems with the equipment. They also revealed that the donation process was flawed, and that the hospital did not have the expertise to assess or maintain the equipment. Technical assessment showed that all units had the wrong voltage and frequency, leading to overheating and breakdown. Subsequently a hospital donations committee was established to oversee the donations process. On-site biomedical engineering expertise was arranged with a nongovernmental organization (NGO) partner. Conclusion Appropriate donations of medical equipment, including oxygen concentrators, can be of benefit to hospitals in resource-poor settings, but recipients and donors need to actively manage donations to ensure that the donations are beneficial. Success requires planning, technical expertise and local participation. Partners with relevant skills and resources may also be needed. In 2002, WHO produced guidelines for medical equipment donations, which address problems that might be encountered. These guidelines should be publicized and used. PMID:18235890
Jones, A Kyle; Heintz, Philip; Geiser, William; Goldman, Lee; Jerjian, Khachig; Martin, Melissa; Peck, Donald; Pfeiffer, Douglas; Ranger, Nicole; Yorkston, John
2015-11-01
Quality control (QC) in medical imaging is an ongoing process and not just a series of infrequent evaluations of medical imaging equipment. The QC process involves designing and implementing a QC program, collecting and analyzing data, investigating results that are outside the acceptance levels for the QC program, and taking corrective action to bring these results back to an acceptable level. The QC process involves key personnel in the imaging department, including the radiologist, radiologic technologist, and the qualified medical physicist (QMP). The QMP performs detailed equipment evaluations and helps with oversight of the QC program, the radiologic technologist is responsible for the day-to-day operation of the QC program. The continued need for ongoing QC in digital radiography has been highlighted in the scientific literature. The charge of this task group was to recommend consistency tests designed to be performed by a medical physicist or a radiologic technologist under the direction of a medical physicist to identify problems with an imaging system that need further evaluation by a medical physicist, including a fault tree to define actions that need to be taken when certain fault conditions are identified. The focus of this final report is the ongoing QC process, including rejected image analysis, exposure analysis, and artifact identification. These QC tasks are vital for the optimal operation of a department performing digital radiography.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, A. Kyle, E-mail: kyle.jones@mdanderson.org; Geiser, William; Heintz, Philip
Quality control (QC) in medical imaging is an ongoing process and not just a series of infrequent evaluations of medical imaging equipment. The QC process involves designing and implementing a QC program, collecting and analyzing data, investigating results that are outside the acceptance levels for the QC program, and taking corrective action to bring these results back to an acceptable level. The QC process involves key personnel in the imaging department, including the radiologist, radiologic technologist, and the qualified medical physicist (QMP). The QMP performs detailed equipment evaluations and helps with oversight of the QC program, the radiologic technologist ismore » responsible for the day-to-day operation of the QC program. The continued need for ongoing QC in digital radiography has been highlighted in the scientific literature. The charge of this task group was to recommend consistency tests designed to be performed by a medical physicist or a radiologic technologist under the direction of a medical physicist to identify problems with an imaging system that need further evaluation by a medical physicist, including a fault tree to define actions that need to be taken when certain fault conditions are identified. The focus of this final report is the ongoing QC process, including rejected image analysis, exposure analysis, and artifact identification. These QC tasks are vital for the optimal operation of a department performing digital radiography.« less
Code of Federal Regulations, 2011 CFR
2011-07-01
... cooled, condensed, and removed in a solid form. Control device means the air pollution control equipment... failure of air pollution control equipment or process equipment or of a process to operate in a normal or... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL...
Code of Federal Regulations, 2010 CFR
2010-07-01
... cooled, condensed, and removed in a solid form. Control device means the air pollution control equipment... failure of air pollution control equipment or process equipment or of a process to operate in a normal or... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL...
Code of Federal Regulations, 2014 CFR
2014-07-01
... cooled, condensed, and removed in a solid form. Control device means the air pollution control equipment... failure of air pollution control equipment or process equipment or of a process to operate in a normal or... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL...
Code of Federal Regulations, 2013 CFR
2013-07-01
... cooled, condensed, and removed in a solid form. Control device means the air pollution control equipment... failure of air pollution control equipment or process equipment or of a process to operate in a normal or... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL...
Code of Federal Regulations, 2012 CFR
2012-07-01
... cooled, condensed, and removed in a solid form. Control device means the air pollution control equipment... failure of air pollution control equipment or process equipment or of a process to operate in a normal or... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL...
Electric power processing, distribution and control for advanced aerospace vehicles.
NASA Technical Reports Server (NTRS)
Krausz, A.; Felch, J. L.
1972-01-01
The results of a current study program to develop a rational basis for selection of power processing, distribution, and control configurations for future aerospace vehicles including the Space Station, Space Shuttle, and high-performance aircraft are presented. Within the constraints imposed by the characteristics of power generation subsystems and the load utilization equipment requirements, the power processing, distribution and control subsystem can be optimized by selection of the proper distribution voltage, frequency, and overload/fault protection method. It is shown that, for large space vehicles which rely on static energy conversion to provide electric power, high-voltage dc distribution (above 100 V dc) is preferable to conventional 28 V dc and 115 V ac distribution per MIL-STD-704A. High-voltage dc also has advantages over conventional constant frequency ac systems in many aircraft applications due to the elimination of speed control, wave shaping, and synchronization equipment.
Space processing applications payload equipment study. Volume 2A: Experiment requirements
NASA Technical Reports Server (NTRS)
Smith, A. G.; Anderson, W. T., Jr.
1974-01-01
An analysis of the space processing applications payload equipment was conducted. The primary objective was to perform a review and an update of the space processing activity research equipment requirements and specifications that were derived in the first study. The analysis is based on the six major experimental classes of: (1) biological applications, (2) chemical processes in fluids, (3) crystal growth, (4) glass technology, (5) metallurgical processes, and (6) physical processes in fluids. Tables of data are prepared to show the functional requirements for the areas of investigation.
Numerical Control/Computer Aided Manufacturing (NC/CAM), A Descom Study
1979-07-01
CAM machines operate directly from computers, but most get instructions in the form of punched tape. The applications of NC/CAM are virtually...Although most NC/CAM equipment is metal working, its applications include electronics manufacturing, glass making, food processing, materiel handling...drafting, woodworking, plastics and inspection, just to name a few. Numerical control, like most technologies, is an advancing and evolutionary process
Process methods and levels of automation of wood pallet repair in the United States
Jonghun Park; Laszlo Horvath; Robert J. Bush
2016-01-01
This study documented the current status of wood pallet repair in the United States by identifying the types of processing and equipment usage in repair operations from an automation prespective. The wood pallet repair firms included in the sudy received an average of approximately 1.28 million cores (i.e., used pallets) for recovery in 2012. A majority of the cores...
Diaconu, Karin; Chen, Yen-Fu; Cummins, Carole; Jimenez Moyao, Gabriela; Manaseki-Holland, Semira; Lilford, Richard
2017-08-18
Forty to 70 % of medical devices and equipment in low- and middle-income countries are broken, unused or unfit for purpose; this impairs service delivery to patients and results in lost resources. Undiscerning procurement processes are at the heart of this issue. We conducted a systematic review of the literature to August 2013 with no time or language restrictions to identify what product selection or prioritization methods are recommended or used for medical device and equipment procurement planning within low- and middle-income countries. We explore the factors/evidence-base proposed for consideration within such methods and identify prioritization criteria. We included 217 documents (corresponding to 250 texts) in the narrative synthesis. Of these 111 featured in the meta-summary. We identify experience and needs-based methods used to reach procurement decisions. Equipment costs (including maintenance) and health needs are the dominant issues considered. Extracted data suggest that procurement officials should prioritize devices with low- and middle-income country appropriate technical specifications - i.e. devices and equipment that can be used given available human resources, infrastructure and maintenance capacity. Suboptimal device use is directly linked to incomplete costing and inadequate consideration of maintenance services and user training during procurement planning. Accurate estimation of life-cycle costing and careful consideration of device servicing are of crucial importance.
Welding at the Kennedy Space Center.
NASA Technical Reports Server (NTRS)
Clautice, W. E.
1973-01-01
Brief description of the nature of the mechanical equipment at a space launch complex from a welding viewpoint. including an identification of the major welding applications used in the construction of this complex. The role played by welding in the ground support equipment is noted, including the welded structures and systems required in the vehicle assembly building, the mobile launchers, transporters, mobile service structure, launch pad and launch site, the propellants system, the pneumatics system, and the environmental control system. The welding processes used at the Kennedy Space Center are reviewed, and a particularly detailed account is given of the design and fabrication of the liquid hydrogen and liquid oxygen storage spheres and piping. Finally, the various methods of testing and inspecting the storage spheres are cited.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-24
... space heating equipment, thermal household equipment, thermal kitchen equipment, uninterruptible power.../or odors from interior dwelling spaces and furniture. Example products include steam cleaners and... equipment. f. Personal Space Heating Equipment This category includes electrical devices that primarily...
Code of Federal Regulations, 2010 CFR
2010-07-01
... hydrogen ratio. It is essentially non-volatile at ambient temperatures with closed cup flash point of 445... recordkeeping and reporting only, compressors are considered equipment. In hydrogen service means that a... sufficient storage facilities for the product. For the purpose of this subpart, process unit includes any...
Apollo experiment S-211 low brightness, astronomical photography
NASA Technical Reports Server (NTRS)
Mercer, R. D.
1974-01-01
The low brightness image analysis for the Apollo flights is reported. The objectives of Experiment S-21 are discussed along with the photographic equipment, and the data processing and analysis flow are presented. Photographic data for Apollo 14, 15, 16, and 17 are included.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (subpart F) Incinerator (subpart G) Major source (subpart A) Malfunction (subpart A) Oil-water separator or organic-water separator (subpart G) Open-ended valve or line (subpart H) Operating permit (subpart F... process unit consists of more than one unit operation. This collection of equipment includes purification...
Code of Federal Regulations, 2013 CFR
2013-07-01
... (subpart F) Incinerator (subpart G) Major source (subpart A) Malfunction (subpart A) Oil-water separator or organic-water separator (subpart G) Open-ended valve or line (subpart H) Operating permit (subpart F... process unit consists of more than one unit operation. This collection of equipment includes purification...
40 CFR 52.134 - Compliance schedules.
Code of Federal Regulations, 2013 CFR
2013-07-01
... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...
40 CFR 52.134 - Compliance schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...
40 CFR 52.134 - Compliance schedules.
Code of Federal Regulations, 2012 CFR
2012-07-01
... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...
40 CFR 52.134 - Compliance schedules.
Code of Federal Regulations, 2014 CFR
2014-07-01
... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...
40 CFR 52.134 - Compliance schedules.
Code of Federal Regulations, 2011 CFR
2011-07-01
... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...
Code of Federal Regulations, 2013 CFR
2013-10-01
... any emergency, natural or man-made (this includes programs that help to plan, equip, train, and... communities; (7) Programs that foster opportunities for Americans born in the post-World War II baby boom to...
Code of Federal Regulations, 2011 CFR
2011-10-01
... any emergency, natural or man-made (this includes programs that help to plan, equip, train, and... communities; (7) Programs that foster opportunities for Americans born in the post-World War II baby boom to...
Code of Federal Regulations, 2014 CFR
2014-10-01
... any emergency, natural or man-made (this includes programs that help to plan, equip, train, and... communities; (7) Programs that foster opportunities for Americans born in the post-World War II baby boom to...
Code of Federal Regulations, 2012 CFR
2012-10-01
... any emergency, natural or man-made (this includes programs that help to plan, equip, train, and... communities; (7) Programs that foster opportunities for Americans born in the post-World War II baby boom to...
INTEGRATED POWER GENERATION SYSTEMS FOR COAL MINE WASTE METHANE UTILIZATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peet M. Soot; Dale R. Jesse; Michael E. Smith
2005-08-01
An integrated system to utilize the waste coal mine methane (CMM) at the Federal No. 2 Coal Mine in West Virginia was designed and built. The system includes power generation, using internal combustion engines, along with gas processing equipment to upgrade sub-quality waste methane to pipeline quality standards. The power generation has a nominal capacity of 1,200 kw and the gas processing system can treat about 1 million cubic feet per day (1 MMCFD) of gas. The gas processing is based on the Northwest Fuel Development, Inc. (NW Fuel) proprietary continuous pressure swing adsorption (CPSA) process that can remove nitrogenmore » from CMM streams. The two major components of the integrated system are synergistic. The byproduct gas stream from the gas processing equipment can be used as fuel for the power generating equipment. In return, the power generating equipment provides the nominal power requirements of the gas processing equipment. This Phase III effort followed Phase I, which was comprised of a feasibility study for the project, and Phase II, where the final design for the commercial-scale demonstration was completed. The fact that NW Fuel is desirous of continuing to operate the equipment on a commercial basis provides the validation for having advanced the project through all of these phases. The limitation experienced by the project during Phase III was that the CMM available to operate the CPSA system on a commercial basis was not of sufficiently high quality. NW Fuel's CPSA process is limited in its applicability, requiring a relatively high quality of gas as the feed to the process. The CPSA process was demonstrated during Phase III for a limited time, during which the processing capabilities met the expected results, but the process was never capable of providing pipeline quality gas from the available low quality CMM. The NW Fuel CPSA process is a low-cost ''polishing unit'' capable of removing a few percent nitrogen. It was never intended to process CMM streams containing high levels of nitrogen, as is now the case at the Federal No.2 Mine. Even lacking the CPSA pipeline delivery demonstration, the project was successful in laying the groundwork for future commercial applications of the integrated system. This operation can still provide a guide for other coal mines which need options for utilization of their methane resources. The designed system can be used as a complete template, or individual components of the system can be segregated and utilized separately at other mines. The use of the CMM not only provides an energy fuel from an otherwise wasted resource, but it also yields an environmental benefit by reducing greenhouse gas emissions. The methane has twenty times the greenhouse effect as compared to carbon dioxide, which the combustion of the methane generates. The net greenhouse gas emission mitigation is substantial.« less
Immunity of medical electrical equipment to radiated RF disturbances
NASA Astrophysics Data System (ADS)
Mocha, Jan; Wójcik, Dariusz; Surma, Maciej
2018-04-01
Immunity of medical equipment to radiated radio frequency (RF) electromagnetic (EM) fields is a priority issue owing to the functions that the equipment is intended to perform. This is reflected in increasingly stringent normative requirements that medical electrical equipment has to conform to. A new version of the standard concerning electromagnetic compatibility of medical electrical equipment IEC 60601-1-2:2014 has recently been published. The paper discusses major changes introduced in this edition of the standard. The changes comprise more rigorous immunity requirements for medical equipment as regards radiated RF EM fields and a new requirement for testing the immunity of medical electrical equipment to disturbances coming from digital radio communication systems. Further on, the paper presents two typical designs of the input block: involving a multi-level filtering and amplification circuit and including a solution which integrates an input amplifier and an analog-to-digital converter in one circuit. Regardless of the applied solution, presence of electromagnetic disturbances in the input block leads to demodulation of the disturbance signal envelope. The article elaborates on mechanisms of amplitude detection occurring in such cases. Electromagnetic interferences penetration from the amplifier's input to the output is also described in the paper. If the aforementioned phenomena are taken into account, engineers will be able to develop a more conscious approach towards the issue of immunity to RF EM fields in the process of designing input circuits in medical electrical equipment.
Radar image processing module development program, phase 3
NASA Technical Reports Server (NTRS)
1977-01-01
The feasibility of using charge coupled devices in an IPM for processing synthetic aperture radar signals onboard the NASA Convair 990 (CV990) aircraft was demonstrated. Radar data onboard the aircraft was recorded and processed using a CCD sampler and digital tape recorder. A description of equipment and testing was provided. The derivation of the digital presum filter was documented. Photographs of the sampler/tape recorder, real time display and circuit boards in the IPM were also included.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Aden, A.; Ruth, M.; Ibsen, K.
This report is an update of NREL's ongoing process design and economic analyses of processes related to developing ethanol from lignocellulosic feedstocks. The U.S. Department of Energy (DOE) is promoting the development of ethanol from lignocellulosic feedstocks as an alternative to conventional petroleum-based transportation fuels. DOE funds both fundamental and applied research in this area and needs a method for predicting cost benefits of many research proposals. To that end, the National Renewable Energy Laboratory (NREL) has modeled many potential process designs and estimated the economics of each process during the last 20 years. This report is an update ofmore » the ongoing process design and economic analyses at NREL. We envision updating this process design report at regular intervals; the purpose being to ensure that the process design incorporates all new data from NREL research, DOE funded research and other sources, and that the equipment costs are reasonable and consistent with good engineering practice for plants of this type. For the non-research areas this means using equipment and process approaches as they are currently used in industrial applications. For the last report, published in 1999, NREL performed a complete review and update of the process design and economic model for the biomass-to-ethanol process utilizing co-current dilute acid prehydrolysis with simultaneous saccharification (enzymatic) and co-fermentation. The process design included the core technologies being researched by the DOE: prehydrolysis, simultaneous saccharification and co-fermentation, and cellulase enzyme production. In addition, all ancillary areas--feed handling, product recovery and purification, wastewater treatment (WWT), lignin combustor and boiler-turbogenerator, and utilities--were included. NREL engaged Delta-T Corporation (Delta-T) to assist in the process design evaluation, the process equipment costing, and overall plant integration. The process design and costing for the lignin combustor and boiler turbogenerator was reviewed by Reaction Engineering Inc. (REI) and Merrick & Company reviewed the wastewater treatment. Since then, NREL has engaged Harris Group (Harris) to perform vendor testing, process design, and costing of critical equipment identified during earlier work. This included solid/liquid separation and pretreatment reactor design and costing. Corn stover handling was also investigated to support DOE's decision to focus on corn stover as a feedstock for lignocellulosic ethanol. Working with Harris, process design and costing for these areas were improved through vendor designs, costing, and vendor testing in some cases. In addition to this work, enzyme costs were adjusted to reflect collaborative work between NREL and enzyme manufacturers (Genencor International and Novozymes Biotech) to provide a delivered enzyme for lignocellulosic feedstocks. This report is the culmination of our work and represents an updated process design and cost basis for the process using a corn stover feedstock. The process design and economic model are useful for predicting the cost benefits of proposed research. Proposed research results can be translated into modifications of the process design, and the economic impact can be assessed. This allows DOE, NREL, and other researchers to set priorities on future research with an understanding of potential reductions to the ethanol production cost. To be economically viable, ethanol production costs must be below market values for ethanol. DOE has chosen a target ethanol selling price of $1.07 per gallon as a goal for 2010. The conceptual design and costs presented here are based on a 2010 plant start-up date. The key research targets required to achieve this design and the $1.07 value are discussed in the report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blum, T.W.; Selvage, R.D.; Courtney, K.H.
This manual is the guide for initiating change at the Plutonium Facility, which handles the processing of plutonium as well as research on plutonium metallurgy. It describes the change and work control processes employed at TA-55 to ensure that all proposed changes are properly identified, reviewed, approved, implemented, tested, and documented so that operations are maintained within the approved safety envelope. All Laboratory groups, their contractors, and subcontractors doing work at TA-55 follow requirements set forth herein. This manual applies to all new and modified processes and experiments inside the TA-55 Plutonium Facility; general plant project (GPP) and line itemmore » funded construction projects at TA-55; temporary and permanent changes that directly or indirectly affect structures, systems, or components (SSCs) as described in the safety analysis, including Facility Control System (FCS) software; and major modifications to procedures. This manual does not apply to maintenance performed on process equipment or facility SSCs or the replacement of SSCs or equipment with documented approved equivalents.« less
Lessons learned: design, start-up, and operation of cryogenic systems
NASA Astrophysics Data System (ADS)
Bell, W. M.; Bagley, R. E.; Motew, S.; Young, P.-W.
2014-11-01
Cryogenic systems involving a pumped cryogenic fluid, such as liquid nitrogen (LN2), require careful design since the cryogen is close to its boiling point and cold. At 1 atmosphere, LN2 boils at 77.4 K (-320.4 F). These systems, typically, are designed to transport the cryogen, use it for process heat removal, or for generation of gas (GN2) for process use. As the design progresses, it is important to consider all aspects of the design including, cryogen storage, pressure control and safety relief systems, thermodynamic conditions, equipment and instrument selection, materials, insulation, cooldown, pump start-up, maximum design and minimum flow rates, two phase flow conditions, heat flow, process control to meet and maintain operating conditions, piping integrity, piping loads on served equipment, warm-up, venting, and shut-down. "Cutting corners" in the design process can result in stalled start-ups, field rework, schedule hits, or operational restrictions. Some of these "lessoned learned" are described in this paper.
Cost Factors in Scaling in SfM Collections and Processing Solutions
NASA Astrophysics Data System (ADS)
Cherry, J. E.
2015-12-01
In this talk I will discuss the economics of scaling Structure from Motion (SfM)-style collections from 1 km2 and below to 100's and 1000's of square kilometers. Considerations include the costs of the technical equipment: comparisons of small, medium, and large-format camera systems, as well as various GPS-INS systems and their impact on processing accuracy for various Ground Sampling Distances. Tradeoffs between camera formats and flight time are central. Weather conditions and planning high altitude versus low altitude flights are another economic factor, particularly in areas of persistently bad weather and in areas where ground logistics (i.e. hotel rooms and pilot incidentals) are expensive. Unique costs associated with UAS collections and experimental payloads will be discussed. Finally, the costs of equipment and labor differs in SfM processing than in conventional orthomosaic and LiDAR processing. There are opportunities for 'economies of scale' in SfM collections under certain circumstances but whether the accuracy specifications are firm/fixed or 'best effort' makes a difference.
Managing the replacement cycle of laser inventory.
Davis, C E
1992-01-01
Medical lasers are quickly moving into the replacement phase of technology management. Barnes Hospital (St. Louis, MO) is using its laser team to define a process of planned laser replacement using the experience gained from traditional medical equipment replacement cycles, quality improvement principles and tools, and other formalized interdisciplinary teams. The process described in this paper has six basic steps: (1) A decision is made to request a replacement laser. (2) An appropriation request form is completed and submitted with the clinical and/or technical justifications. (3) Those requests initiated outside of the Clinical Engineering Department are reviewed by the Clinical Engineer/Medical Laser Safety Officer (CE/MLSO). (4) The CE/MLSO presents the requests to the hospital Laser Committee, and (5) then to the Laser Users' Group. (6) Finally, an Expenditure Authorization Committee reviews all capital expense requests, including those for replacement lasers, and allocates funds for the next fiscal year. This paper illustrates and evaluates the process, using an example from the review process for 1993 equipment purchases at Barnes Hospital.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tang, A; Samost, A; Viswanathan, A
Purpose: To investigate the hazards in cervical-cancer HDR brachytherapy using a novel hazard-analysis technique, System Theoretic Process Analysis (STPA). The applicability and benefit of STPA to the field of radiation oncology is demonstrated. Methods: We analyzed the tandem and ring HDR procedure through observations, discussions with physicists and physicians, and the use of a previously developed process map. Controllers and their respective control actions were identified and arranged into a hierarchical control model of the system, modeling the workflow from applicator insertion through initiating treatment delivery. We then used the STPA process to identify potentially unsafe control actions. Scenarios weremore » then generated from the identified unsafe control actions and used to develop recommendations for system safety constraints. Results: 10 controllers were identified and included in the final model. From these controllers 32 potentially unsafe control actions were identified, leading to more than 120 potential accident scenarios, including both clinical errors (e.g., using outdated imaging studies for planning), and managerial-based incidents (e.g., unsafe equipment, budget, or staffing decisions). Constraints identified from those scenarios include common themes, such as the need for appropriate feedback to give the controllers an adequate mental model to maintain safe boundaries of operations. As an example, one finding was that the likelihood of the potential accident scenario of the applicator breaking during insertion might be reduced by establishing a feedback loop of equipment-usage metrics and equipment-failure reports to the management controller. Conclusion: The utility of STPA in analyzing system hazards in a clinical brachytherapy system was demonstrated. This technique, rooted in system theory, identified scenarios both technical/clinical and managerial in nature. These results suggest that STPA can be successfully used to analyze safety in brachytherapy and may prove to be an alternative to other hazard analysis techniques.« less
41 CFR 109-50.203 - Eligible equipment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 50-SPECIAL DOE DISPOSAL AUTHORITIES 50.2-Math and Science Equipment Gift Program § 109-50.203... and Laboratory Equipment. 67Photographic Equipment. 70General Purpose Automatic Data Processing...
41 CFR 109-50.203 - Eligible equipment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 50-SPECIAL DOE DISPOSAL AUTHORITIES 50.2-Math and Science Equipment Gift Program § 109-50.203... and Laboratory Equipment. 67Photographic Equipment. 70General Purpose Automatic Data Processing...
41 CFR 109-50.203 - Eligible equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 50-SPECIAL DOE DISPOSAL AUTHORITIES 50.2-Math and Science Equipment Gift Program § 109-50.203... and Laboratory Equipment. 67Photographic Equipment. 70General Purpose Automatic Data Processing...
41 CFR 109-50.203 - Eligible equipment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 50-SPECIAL DOE DISPOSAL AUTHORITIES 50.2-Math and Science Equipment Gift Program § 109-50.203... and Laboratory Equipment. 67Photographic Equipment. 70General Purpose Automatic Data Processing...
U.S. Rep. Dave Weldon looks at the U.S. Lab Destiny in the SSPF.
NASA Technical Reports Server (NTRS)
1999-01-01
Inside the U.S. Lab, called 'Destiny,' which is in the Space Station Processing Facility, U.S. Rep. Dave Weldon (right) looks over equipment. In the background (center) is Thomas R. 'Randy' Galloway, with the Space Station Hardware Integration Office. Weldon is on the House Science Committee and vice chairman of the Space and Aeronautics Subcommittee. Destiny is scheduled to be launched on Space Shuttle Endeavour in early 2000. It will become the centerpiece of scientific research on the ISS, with five equipment racks aboard to provide essential functions for station systems, including high data-rate communications, and to maintain the station's orientation using control gyroscopes launched earlier. Additional equipment and research racks will be installed in the laboratory on subsequent Shuttle flights.
Modernizing the automatic temperature-regulating systems for electric resistor furnaces
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anchevskii, I.V.; Afanasiadi, N.G.; Demin, V.P.
An analysis of the technical level of heat-treating equipment at the sector's plants showed that automation was either insufficient or completely lacking. Modern heat-treating technology makes stringent demands on heat-treating equipment, including electric resistor furnaces. Therefore, it became necessary to modernize these furnaces and equip them with modern automatic temperature control systems (ATCSs). This is most urgent for furnaces which handle nuclear-power-station parts, which must not only be held at a certain temperature for a definite time, but which also require a complex process with established heating rates in each time period. The heat-treatment data are recorded in the part'smore » passport certificate, and the temperatures of both the heatingzone atmosphere and the heat-treated part are monitored.« less
Strategic national stockpile: overview and ventilator assets.
Malatino, Eileen M
2008-01-01
Acquiring a resupply of critical medical assets following a national emergency will be crucial to saving lives. The Strategic National Stockpile is a national repository of various medications, vaccines, antidotes, and medical/surgical equipment that would be used to augment federal, state, and local public health agencies in the event of a terrorist attack or other public health emergency. Portable ventilators are included in the stockpile Managed Inventory. These ventilators and the ancillary equipment needed for one adult or one pediatric patient are kitted in a durable case that is staged and ready for deployment. A state that requires these assets initiates a request for federal assistance through established guidelines. This paper provides an overview of the Strategic National Stockpile, the types of ventilators and ancillary equipment currently available, and the process for requesting these assets.
ERIC Educational Resources Information Center
Joint Economic Committee, Washington, DC.
This report is based on hearings that the subcommittee held on July 1, 1970, entitled "Economy in Government Property Management--Procurement of Data Processing Equipment" as well as General Accounting Office and General Services Administration reports. It focuses upon the phenomenal growth in the use of automatic data processing equipment by the…
Computer software configuration description, 241-AY and 241-AZ tank farm MICON automation system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Winkelman, W.D.
This document describes the configuration process, choices and conventions used during the configuration activities, and issues involved in making changes to the configuration. Includes the master listings of the Tag definitions, which should be revised to authorize any changes. Revision 2 incorporates minor changes to ensure the document setpoints accurately reflect limits (including exhaust stack flow of 800 scfm) established in OSD-T-151-00019. The MICON DCS software controls and monitors the instrumentation and equipment associated with plant systems and processes.
Silicon production process evaluations
NASA Technical Reports Server (NTRS)
1982-01-01
Engineering design of the third distillation column in the process was accomplished. The initial design is based on a 94.35% recovery of dichlorosilane in the distillate and a 99.9% recovery of trichlorosilane in the bottoms. The specified separation is achieved at a reflux ratio of 15 with 20 trays (equilibrium stages). Additional specifications and results are reported including equipment size, temperatures and pressure. Specific raw material requirements necessary to produce the silicon in the process are presented. The primary raw materials include metallurgical grade silicon, silicon tetrachloride, hydrogen, copper (catalyst) and lime (waste treatment). Hydrogen chloride is produced as by product in the silicon deposition. Cost analysis of the process was initiated during this reporting period.
NASA Technical Reports Server (NTRS)
Taylor, R. E.; Sennott, J. W. (Inventor)
1984-01-01
In a global positioning system (GPS), such as the NAVSTAR/GPS system, wherein the position coordinates of user terminals are obtained by processing multiple signals transmitted by a constellation of orbiting satellites, an acquisition-aiding signal generated by an earth-based control station is relayed to user terminals via a geostationary satellite to simplify user equipment. The aiding signal is FSK modulated on a reference channel slightly offset from the standard GPS channel. The aiding signal identifies satellites in view having best geometry and includes Doppler prediction data as well as GPS satellite coordinates and identification data associated with user terminals within an area being served by the control station and relay satellite. The aiding signal significantly reduces user equipment by simplifying spread spectrum signal demodulation and reducing data processing functions previously carried out at the user terminals.
ERIC Educational Resources Information Center
Honeywell, Inc., Minneapolis, Minn.
A number of different automation systems for use in monitoring and controlling building equipment are described in this brochure. The system functions include--(1) collection of information, (2) processing and display of data at a central panel, and (3) taking corrective action by sounding alarms, making adjustments, or automatically starting and…
Getting Everybody Involved: Cooperative PowerPoint Creations Benefit Inclusion Students.
ERIC Educational Resources Information Center
Kelly, Rebecca
1999-01-01
Describes the use of PowerPoint software in a cooperative setting that allows inclusion students to create presentations as part of the learning process. Discusses equipment needed, audience, teacher and student preparation, and student evaluation, and includes examples of storyboards and worksheets. (Author/LRW)
Vietnam PNTR Status and WTO Accession: Issues and Implications for the United States
2006-08-02
footwear, wooden furniture, frozen shrimp, petroleum products, cashew nuts , coffee Major Exports to Vietnam aircraft, mining equipment, electronic...agricultural products (including beef, pork, dairy, fruits, nuts , processed foods, soybean products, cotton and hides and skins, and grains) to rates of 15% or
Adapting for Impaired Patrons.
ERIC Educational Resources Information Center
Schuyler, Michael
1999-01-01
Describes how a library, with an MCI Corporation grant, approached the process of setting up computers for the visually impaired. Discusses preparations, which included hiring a visually-impaired user as a consultant and contacting the VIP (Visually Impaired Persons) group; equipment; problems with the graphical user interface; and training.…
Restoring Western Ranges and Wildlands, vol. 2
Stephen B. Monsen; Richard Stevens; Nancy L. Shaw
2004-01-01
This work, in three volumes, provides background on philosophy, processes, plant materials selection, site preparation, and seed and seeding equipment for revegetating disturbed rangelands, emphasizing use of native species. The 29 chapters include guidelines for planning, conducting, and managing, and contain a compilation of rangeland revegetation research conducted...
Materials for Space Exploration
NASA Technical Reports Server (NTRS)
Robertson, Luke B.; Williams, Martha
2010-01-01
Topics include a lab overview, testing and processing equipment, hemochromic hydrogen sensors, antimicrobial materials, wire system materials, CNT ink formulations, CNT ink dust screens, CNT ink printed circuitry, cryogenic materials development, fire and polymers, the importance of lighting, electric lighting systems, LED for plant growth, and carbon nanotube fiber filaments.
40 CFR 65.119 - Recordkeeping provisions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... agitators equipped with a dual mechanical seal system that includes barrier fluid system, the owner or... assessment that identifies the representative composition of the process fluid. The assessment shall be based... pump visual inspections as specified in § 65.107(b)(4). (ii) Documentation of dual mechanical seal pump...
Study of Mechanization in DOD Libraries and Information Centers.
ERIC Educational Resources Information Center
Booz, Allen Applied Research, Inc., Bethesda, MD.
This report summarizes the on-site study of mechanization in DoD libraries and information centers. Included are presentations and evaluations on thesaurus building, file structure, input processing, serial control, selective dissemination of information, circulation control, equipments being used, recommendations on information retrieval systems,…
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Incinerator (subpart G) Major source (subpart A) Malfunction (subpart A) Oil-water separator or organic-water... process unit consists of more than one unit operation. This collection of equipment includes purification... feed tank drawdown; water formed during a chemical reaction or used as a reactant; water used to wash...
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Incinerator (subpart G) Major source (subpart A) Malfunction (subpart A) Oil-water separator or organic-water... process unit consists of more than one unit operation. This collection of equipment includes purification... feed tank drawdown; water formed during a chemical reaction or used as a reactant; water used to wash...
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Incinerator (subpart G) Major source (subpart A) Malfunction (subpart A) Oil-water separator or organic-water... process unit consists of more than one unit operation. This collection of equipment includes purification... feed tank drawdown; water formed during a chemical reaction or used as a reactant; water used to wash...
40 CFR 63.1031 - Compressors standards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... specified in the referencing subpart. (b) Seal system standard. Each compressor shall be equipped with a seal system that includes a barrier fluid system and that prevents leakage of process fluid to the.... Each compressor seal system shall meet the applicable requirements specified in paragraph (b)(1), (b)(2...
40 CFR 63.1031 - Compressors standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... specified in the referencing subpart. (b) Seal system standard. Each compressor shall be equipped with a seal system that includes a barrier fluid system and that prevents leakage of process fluid to the.... Each compressor seal system shall meet the applicable requirements specified in paragraph (b)(1), (b)(2...
Restoring Western Ranges and Wildlands, vol. 3
Stephen B. Monsen; Richard Stevens; Nancy L. Shaw
2004-01-01
This work, in three volumes, provides background on philosophy, processes, plant materials selection, site preparation, and seed and seeding equipment for revegetating disturbed rangelands, emphasizing use of native species. The 29 chapters include guidelines for planning, conducting, and managing, and contain a compilation of rangeland revegetation research conducted...
Restoring Western Ranges and Wildlands, vol. 1
Stephen B. Monsen; Richard Stevens; Nancy L. Shaw
2004-01-01
This work, in three volumes, provides background on philosophy, processes, plant materials selection, site preparation, and seed and seeding equipment for revegetating disturbed rangelands, emphasizing use of native species. The 29 chapters include guidelines for planning, conducting, and managing, and contain a compilation of rangeland revegetation research conducted...
7 CFR 54.1021 - Request for appeal service.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Sanitary Design and Fabrication of Equipment Used in the Slaughter, Processing, and Packaging of Livestock... appeal service shall be filed with the Chief, directly or through the design review specialist who... telephone) or in writing (including by facsimile transmission). If made orally, the Dairy Grading Branch...
7 CFR 54.1021 - Request for appeal service.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Sanitary Design and Fabrication of Equipment Used in the Slaughter, Processing, and Packaging of Livestock... appeal service shall be filed with the Chief, directly or through the design review specialist who... telephone) or in writing (including by facsimile transmission). If made orally, the Dairy Grading Branch...
7 CFR 54.1021 - Request for appeal service.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Sanitary Design and Fabrication of Equipment Used in the Slaughter, Processing, and Packaging of Livestock... appeal service shall be filed with the Chief, directly or through the design review specialist who... telephone) or in writing (including by facsimile transmission). If made orally, the Dairy Grading Branch...
7 CFR 54.1021 - Request for appeal service.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Sanitary Design and Fabrication of Equipment Used in the Slaughter, Processing, and Packaging of Livestock... appeal service shall be filed with the Chief, directly or through the design review specialist who... telephone) or in writing (including by facsimile transmission). If made orally, the Dairy Grading Branch...
7 CFR 54.1021 - Request for appeal service.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Sanitary Design and Fabrication of Equipment Used in the Slaughter, Processing, and Packaging of Livestock... appeal service shall be filed with the Chief, directly or through the design review specialist who... telephone) or in writing (including by facsimile transmission). If made orally, the Dairy Grading Branch...
Extraterrestrial processing and manufacturing of large space systems. Volume 3: Executive summary
NASA Technical Reports Server (NTRS)
Miller, R. H.; Smith, D. B. S.
1979-01-01
Facilities and equipment are defined for refining processes to commercial grade of lunar material that is delivered to a 'space manufacturing facility' in beneficiated, primary processed quality. The manufacturing facilities and the equipment for producing elements of large space systems from these materials and providing programmatic assessments of the concepts are also defined. In-space production processes of solar cells (by vapor deposition) and arrays, structures and joints, conduits, waveguides, RF equipment radiators, wire cables, converters, and others are described.
Options for organization and operation of space applications transfer centers
NASA Technical Reports Server (NTRS)
Robinson, A. C.; Madigan, J. A.
1976-01-01
The benefits of developing regional facilities for transfer of NASA developed technology are discussed. These centers are designed to inform, persuade, and serve users. Included will be equipment for applications and demonstrations of the processes, a library, training facilities, and meeting rooms. The staff will include experts in the various techniques, as well as personnel involved in finding and persuading potential users.
2000-09-16
KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility (OPF) bay 2 during Crew Equipment Interface Test (CEIT), Mission Specialists Joe Tanner (left) and Carlos Noriega (right) practice working parts of the Orbital Docking System (ODS) in Endeavour’s payload bay. The CEIT provides an opportunity for crew members to check equipment and facilities that will be on board the orbiter during their mission. The STS-97 mission will be the sixth construction flight to the International Space Station. The payload includes a photovoltaic (PV) module, providing solar power to the Station. STS-97 is scheduled to launch Nov. 30 from KSC for the 10-day mission
2000-09-16
In Orbiter Processing Facility bay 2 during a Crew Equipment Interface Test (CEIT), STS-97 Pilot Michael Bloomfied (left) and Commander Brent Jett (right) check out the cockpit of orbiter Endeavour as part of preflight preparations. The CEIT provides an opportunity for crew members to check equipment and facilities that will be on board the orbiter during their mission. The STS-97 mission will be the sixth construction flight to the International Space Station. The payload includes a photovoltaic (PV) module, providing solar power to the Station. STS-97 is scheduled to launch Nov. 30 from KSC for the 10-day mission
2000-09-16
In Orbiter Processing Facility bay 2 during a Crew Equipment Interface Test (CEIT), STS-97 Pilot Michael Bloomfied (left) and Commander Brent Jett (right) check out the cockpit of orbiter Endeavour as part of preflight preparations. The CEIT provides an opportunity for crew members to check equipment and facilities that will be on board the orbiter during their mission. The STS-97 mission will be the sixth construction flight to the International Space Station. The payload includes a photovoltaic (PV) module, providing solar power to the Station. STS-97 is scheduled to launch Nov. 30 from KSC for the 10-day mission
2000-09-16
In Orbiter Processing Facility bay 2 during a Crew Equipment Interface Test (CEIT), STS-97 Commander Brent Jett (left) and Pilot Michael Bloomfied (right) check out the cockpit of orbiter Endeavour as part of preflight preparations. The CEIT provides an opportunity for crew members to check equipment and facilities that will be on board the orbiter during their mission. The STS-97 mission will be the sixth construction flight to the International Space Station. The payload includes a photovoltaic (PV) module, providing solar power to the Station. STS-97 is scheduled to launch Nov. 30 from KSC for the 10-day mission
2000-09-16
During a Crew Equipment Interface Test (CEIT), STS-97 Commander Brent Jett (left) and Pilot Michael Bloomfied (right) check out the cockpit of orbiter Endeavour in Orbiter Processing Facility bay 2 as part of preflight preparations. The CEIT provides an opportunity for crew members to check equipment and facilities that will be on board the orbiter during their mission. The STS-97 mission will be the sixth construction flight to the International Space Station. The payload includes a photovoltaic (PV) module, providing solar power to the Station. STS-97 is scheduled to launch Nov. 30 from KSC for the 10-day mission
2000-09-16
KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility (OPF) bay 2 during Crew Equipment Interface Test (CEIT), Mission Specialists Joe Tanner (left) and Carlos Noriega (right) practice working parts of the Orbital Docking System (ODS) in Endeavour’s payload bay. The CEIT provides an opportunity for crew members to check equipment and facilities that will be on board the orbiter during their mission. The STS-97 mission will be the sixth construction flight to the International Space Station. The payload includes a photovoltaic (PV) module, providing solar power to the Station. STS-97 is scheduled to launch Nov. 30 from KSC for the 10-day mission
2000-09-16
During a Crew Equipment Interface Test (CEIT), STS-97 Commander Brent Jett (left) and Pilot Michael Bloomfied (right) check out the cockpit of orbiter Endeavour in Orbiter Processing Facility bay 2 as part of preflight preparations. The CEIT provides an opportunity for crew members to check equipment and facilities that will be on board the orbiter during their mission. The STS-97 mission will be the sixth construction flight to the International Space Station. The payload includes a photovoltaic (PV) module, providing solar power to the Station. STS-97 is scheduled to launch Nov. 30 from KSC for the 10-day mission
2000-09-16
In Orbiter Processing Facility bay 2 during a Crew Equipment Interface Test (CEIT), STS-97 Commander Brent Jett (left) and Pilot Michael Bloomfied (right) check out the cockpit of orbiter Endeavour as part of preflight preparations. The CEIT provides an opportunity for crew members to check equipment and facilities that will be on board the orbiter during their mission. The STS-97 mission will be the sixth construction flight to the International Space Station. The payload includes a photovoltaic (PV) module, providing solar power to the Station. STS-97 is scheduled to launch Nov. 30 from KSC for the 10-day mission
2008-10-01
CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-127 crew members become familiar with the payload and hardware for their mission. Here they are looking at the Experiment Logistics Module - Exposed Section, or ELM-ES, berthing mechanism. The mission payload also includes the Extended Facility and the Inter Orbit Communication System Extended Facility, or ICS-EF. Equipment familiarization is part of a Crew Equipment Interface Test. The payload will be launched to the International Space Station aboard the space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Kim Shiflett
2008-10-01
CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-127 crew members become familiar with the payload and hardware for their mission. Here they are looking at the Experiment Logistics Module - Exposed Section, or ELM-ES, berthing mechanism. The mission payload also includes the Extended Facility and the Inter Orbit Communication System Extended Facility, or ICS-EF. Equipment familiarization is part of a Crew Equipment Interface Test. The payload will be launched to the International Space Station aboard the space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Kim Shiflett
The STS-97 crew take part in CEIT
NASA Technical Reports Server (NTRS)
2000-01-01
In Orbiter Processing Facility (OPF) bay 2 during Crew Equipment Interface Test (CEIT), Mission Specialists Joe Tanner (left) and Carlos Noriega (right) practice working parts of the Orbital Docking System (ODS) in Endeavour's payload bay. The CEIT provides an opportunity for crew members to check equipment and facilities that will be on board the orbiter during their mission. The STS-97 mission will be the sixth construction flight to the International Space Station. The payload includes a photovoltaic (PV) module, providing solar power to the Station. STS-97 is scheduled to launch Nov. 30 from KSC for the 10-day mission.
NASA Technical Reports Server (NTRS)
1975-01-01
Facilities are described on which detailed preliminary design was undertaken and which may be used on early space shuttle missions in the 1979-1982 time-frame. The major hardware components making up each facility are identified, and development schedules for the major hardware items and the payload buildup are included. Cost data for the facilities, and the assumptions and ground rules supporting these data are given along with a recommended listing of supporting research and technology needed to ensure confidence in the ability to achieve successful development of the equipment and technology.
Acceptance Equipment System Data Acquisition and Processing Utility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fakhro, Rowan
2015-02-01
My internship at Sandia National Laboratories took place in the Department of Sensors and Embedded Systems, which is tasked with, among many things, the non-destructive testing of thermal batteries. The Acceptance Equipment System (AES) is a flexible rack system designed to electrically test thermal batteries individually for internal defects before they are stored in the battery stock pile. Aside from individual testing, data acquired by the AES is used for many things including trending and catching outliers within the tolerance levels of a particular battery type, allowing for the development of more refined acceptance requirements and testing procedures.
NASA Astrophysics Data System (ADS)
Cho, Byoung-Kwan; Kim, Moon S.; Chen, Yud-Ren
2005-11-01
Emerging concerns about safety and security in current mass production of food products necessitate rapid and reliable inspection for contaminant-free products. Diluted fecal residues on poultry processing plant equipment surface, not easily discernable from water by human eye, are contamination sources for poultry carcasses. Development of sensitive detection methods for fecal residues is essential to ensure safe production of poultry carcasses. Hyperspectral imaging techniques have shown good potential for detecting of the presence of fecal and other biological substances on food and processing equipment surfaces. In this study, use of high spatial resolution hyperspectral reflectance and fluorescence imaging (with UV-A excitation) is presented as a tool for selecting a few multispectral bands to detect diluted fecal and ingesta residues on materials used for manufacturing processing equipment. Reflectance and fluorescence imaging methods were compared for potential detection of a range of diluted fecal residues on the surfaces of processing plant equipment. Results showed that low concentrations of poultry feces and ingesta, diluted up to 1:100 by weight with double distilled water, could be detected using hyperspectral fluorescence images with an accuracy of 97.2%. Spectral bands determined in this study could be used for developing a real-time multispectral inspection device for detection of harmful organic residues on processing plant equipment.
Powder compaction in systems of bimodal distribution
NASA Technical Reports Server (NTRS)
Chattopadhyay, A. K.; Whittemore, O. J., Jr.
1973-01-01
The compaction of mixtures involving different particle sizes is discussed. The various stages of the compaction process include the rearrangement of particles, the filling of the interstices of the large particles by the smaller ones, and the change in particle size and shape upon further densification through the application of pressure. Experimental approaches and equipment used for compacting material are discussed together with the theoretical relations of the compacting process.
NASA Technical Reports Server (NTRS)
1980-01-01
The design and development of an advanced Czochralski crystal grower are described. Several exhaust gas analysis system equipment specifications studied are discussed. Process control requirements were defined and design work began on the melt temperature, melt level, and continuous diameter control. Sensor development included assembly and testing of a bench prototype of a diameter scanner system.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., special test equipment or special tooling. Government-furnished property means property in the possession... contractor-acquired property. Government property includes material, equipment, special tooling, special test... end-item. Material does not include equipment, special tooling, special test equipment or real...
NASA Astrophysics Data System (ADS)
Karmazikov, Y. V.; Fainberg, E. M.
2005-06-01
Work with DICOM compatible equipment integrated into hardware and software systems for medical purposes has been considered. Structures of process of reception and translormation of the data are resulted by the example of digital rentgenography and angiography systems, included in hardware-software complex DIMOL-IK. Algorithms of reception and the analysis of the data are offered. Questions of the further processing and storage of the received data are considered.
Automated Space Processing Payloads Study. Volume 1: Executive Summary
NASA Technical Reports Server (NTRS)
1975-01-01
An investigation is described which examined the extent to which the experiment hardware and operational requirements can be met by automatic control and material handling devices; payload and system concepts are defined which make extensive use of automation technology. Topics covered include experiment requirements and hardware data, capabilities and characteristics of industrial automation equipment and controls, payload grouping, automated payload conceptual design, space processing payload preliminary design, automated space processing payloads for early shuttle missions, and cost and scheduling.
Zimmerman, Janice L; Sprung, Charles L
2010-04-01
To provide recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza pandemic or mass disaster with a specific focus on ensuring that adequate resources are available and appropriate protocols are developed to safely perform procedures in patients with and without influenza illness. Based on a literature review and expert opinion, a Delphi process was used to define the essential topics including performing medical procedures. Key recommendations include: (1) specify high-risk procedures (aerosol generating-procedures); (2) determine if certain procedures will not be performed during a pandemic; (3) develop protocols for safe performance of high-risk procedures that include appropriateness, qualifications of personnel, site, personal protection equipment, safe technique and equipment needs; (4) ensure adequate training of personnel in high-risk procedures; (5) procedures should be performed at the bedside whenever possible; (6) ensure safe respiratory therapy practices to avoid aerosols; (7) provide safe respiratory equipment; and (8) determine criteria for cancelling and/or altering elective procedures. Judicious planning and adoption of protocols for safe performance of medical procedures are necessary to optimize outcomes during a pandemic.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keck, R.D.
1997-01-21
The purpose of this document is to record the technical evaluation of the Limiting Condition for Operation (LCO) described in the Plutonium Finishing Plant (PFP) Operational Safety Requirements, WHC-SD-CP-OSR- 010, Rev. 0. Kay 1994, Section 3.2.3, `Supply Ventilation System Seismic Shutdown.` This document, with its appendices, provides the following: 1. The system functional requirements for determining system operability (Section 3). 2. Evaluations of equipment to determine the safety boundary for the system (Section 4). 3. A list of annotated drawings which show the safety envelope boundaries (Appendix C). 4. A list of the safety envelope equipment (Appendix B). 5. Functionalmore » requirements for the individual safety envelope equipment, including appropriate setpoints and process parameters (Section 4.1). 6. A list of the operational, maintenance and surveillance procedures necessary to operate and maintain the system equipment within the safety envelope (Sections 5 and 6 and Appendix A).« less
An optimization tool for satellite equipment layout
NASA Astrophysics Data System (ADS)
Qin, Zheng; Liang, Yan-gang; Zhou, Jian-ping
2018-01-01
Selection of the satellite equipment layout with performance constraints is a complex task which can be viewed as a constrained multi-objective optimization and a multiple criteria decision making problem. The layout design of a satellite cabin involves the process of locating the required equipment in a limited space, thereby satisfying various behavioral constraints of the interior and exterior environments. The layout optimization of satellite cabin in this paper includes the C.G. offset, the moments of inertia and the space debris impact risk of the system, of which the impact risk index is developed to quantify the risk to a satellite cabin of coming into contact with space debris. In this paper an optimization tool for the integration of CAD software as well as the optimization algorithms is presented, which is developed to automatically find solutions for a three-dimensional layout of equipment in satellite. The effectiveness of the tool is also demonstrated by applying to the layout optimization of a satellite platform.
Development of pulsed processes for the manufacture of solar cells
NASA Technical Reports Server (NTRS)
Minnucci, J. A.
1978-01-01
The results of a 1-year program to develop the processes required for low-energy ion implantation for the automated production of silicon solar cells are described. The program included: (1) demonstrating state-of-the-art ion implantation equipment and designing an automated ion implanter, (2) making efforts to improve the performance of ion-implanted solar cells to 16.5 percent AM1, (3) developing a model of the pulse annealing process used in solar cell production, and (4) preparing an economic analysis of the process costs of ion implantation.
1. VIEW OF A PORTION OF THE HYDRIDE PROCESSING LABORATORY. ...
1. VIEW OF A PORTION OF THE HYDRIDE PROCESSING LABORATORY. OPERATIONS IN THE GLOVE BOX IN THE BACKGROUND OF THE PHOTOGRAPH INCLUDED HYDRIDING OF PLUTONIUM AND HYDRIDE SEPARATION. IN THE FOREGROUND, THE VACUUM MONITOR CONTROL PANEL MEASURED TEMPERATURES WITHIN THE GLOVEBOX. THE CENTER CONTROL PANEL REGULATED THE FURNACE INSIDE THE GLOVE BOX USED IN THE HYDRIDING PROCESSES. THIS EQUIPMENT WAS ESSENTIAL TO THE HYDRIDING PROCESS, AS WELL AS OTHER GLOVE BOX OPERATIONS. - Rocky Flats Plant, Plutonium Laboratory, North-central section of industrial area at 79 Drive, Golden, Jefferson County, CO
Reactor Operations Monitoring System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, M.M.
1989-01-01
The Reactor Operations Monitoring System (ROMS) is a VME based, parallel processor data acquisition and safety action system designed by the Equipment Engineering Section and Reactor Engineering Department of the Savannah River Site. The ROMS will be analyzing over 8 million signal samples per minute. Sixty-eight microprocessors are used in the ROMS in order to achieve a real-time data analysis. The ROMS is composed of multiple computer subsystems. Four redundant computer subsystems monitor 600 temperatures with 2400 thermocouples. Two computer subsystems share the monitoring of 600 reactor coolant flows. Additional computer subsystems are dedicated to monitoring 400 signals from assortedmore » process sensors. Data from these computer subsystems are transferred to two redundant process display computer subsystems which present process information to reactor operators and to reactor control computers. The ROMS is also designed to carry out safety functions based on its analysis of process data. The safety functions include initiating a reactor scram (shutdown), the injection of neutron poison, and the loadshed of selected equipment. A complete development Reactor Operations Monitoring System has been built. It is located in the Program Development Center at the Savannah River Site and is currently being used by the Reactor Engineering Department in software development. The Equipment Engineering Section is designing and fabricating the process interface hardware. Upon proof of hardware and design concept, orders will be placed for the final five systems located in the three reactor areas, the reactor training simulator, and the hardware maintenance center.« less
Ultra-high pressure water jetting for coating removal and surface preparation
NASA Technical Reports Server (NTRS)
Johnson, Spencer T.
1995-01-01
This paper shall examine the basics of water technology with particular attention paid to systems currently in use and some select new applications. By providing an overview of commercially available water jet systems in the context of recent case histories, potential users may evaluate the process for future applications. With the on going introduction of regulations prohibiting the use of chemical paint strippers, manual scrapping and dry abrasive media blasting, the need for an environmentally compliant coating removal process has been mandated. Water jet cleaning has been a traditional part of many industrial processed for year, although it has only been in the last few years that reliable pumping equipment capable of ultra-high pressure operation have become available. With the advent of water jet pumping equipment capable of sustaining pressures in excess of 36,000 psi. there has been shift away from lower pressure, high water volume systems. One of the major factors in driving industry to seek higher pressures is the ability to offer higher productivity rates while lowering the quantity of water used and subsequently reprocessed. Among benefits of the trend toward higher pressure/lower volume systems is the corresponding reduction in water jet reaction forces making hand held water jetting practical and safe. Other unique applications made possible by these new generation pumping systems include the use of alternative fluids including liquid ammonia for specialized and hazardous material removal applications. A review of the equipment used and the required modifications will be presented along with the conclusions reached reached during this test program.
Building laboratory capacity to support HIV care in Nigeria: Harvard/APIN PEPFAR, 2004-2012.
Hamel, Donald J; Sankalé, Jean-Louis; Samuels, Jay Osi; Sarr, Abdoulaye D; Chaplin, Beth; Ofuche, Eke; Meloni, Seema T; Okonkwo, Prosper; Kanki, Phyllis J
From 2004-2012, the Harvard/AIDS Prevention Initiative in Nigeria, funded through the US President's Emergency Plan for AIDS Relief programme, scaled up HIV care and treatment services in Nigeria. We describe the methodologies and collaborative processes developed to improve laboratory capacity significantly in a resource-limited setting. These methods were implemented at 35 clinic and laboratory locations. Systems were established and modified to optimise numerous laboratory processes. These included strategies for clinic selection and management, equipment and reagent procurement, supply chains, laboratory renovations, equipment maintenance, electronic data management, quality development programmes and trainings. Over the eight-year programme, laboratories supported 160 000 patients receiving HIV care in Nigeria, delivering over 2.5 million test results, including regular viral load quantitation. External quality assurance systems were established for CD4+ cell count enumeration, blood chemistries and viral load monitoring. Laboratory equipment platforms were improved and standardised and use of point-of-care analysers was expanded. Laboratory training workshops supported laboratories toward increasing staff skills and improving overall quality. Participation in a World Health Organisation-led African laboratory quality improvement system resulted in significant gains in quality measures at five laboratories. Targeted implementation of laboratory development processes, during simultaneous scale-up of HIV treatment programmes in a resource-limited setting, can elicit meaningful gains in laboratory quality and capacity. Systems to improve the physical laboratory environment, develop laboratory staff, create improvements to reduce costs and increase quality are available for future health and laboratory strengthening programmes. We hope that the strategies employed may inform and encourage the development of other laboratories in resource-limited settings.
9 CFR 71.21 - Tissue and blood testing at slaughter.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., taking into account whether APHIS will be conducting complete tests at the facility, or only collecting..., until after the post-mortem examination is completed; (4) Includes tables, benches, and other equipment on which sample collection and processing are to be performed, of such design, material, and...
Appropriate Programs for Foreign Students in U.S. Chemical Engineering Curricula.
ERIC Educational Resources Information Center
Findley, M. E.
Chemical engineers in developing countries may need abilities in a number of diverse areas including management, planning, chemistry, equipment, processes, politics, and improvisation. Chemical engineering programs for foreign students can be arranged by informed advisers with student input for inclusion of some of these areas in addition to…
40 CFR 63.1324 - Batch process vents-monitoring equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... installed in the gas stream immediately before and after the catalyst bed. (2) Where a flare is used, a device (including but not limited to a thermocouple, ultra-violet beam sensor, or infrared sensor... scrubber influent for liquid flow. Gas stream flow shall be determined using one of the procedures...
40 CFR 63.1324 - Batch process vents-monitoring equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... installed in the gas stream immediately before and after the catalyst bed. (2) Where a flare is used, a device (including but not limited to a thermocouple, ultra-violet beam sensor, or infrared sensor... scrubber influent for liquid flow. Gas stream flow shall be determined using one of the procedures...
Biotechnology Process Engineering Center at MIT - Overview
laboratories. Biotechnology-related research in the labs of over 15 faculty members in the Biological 60,000 square feet for biotechnology-related engineering research. This centralization and consolidation wider array of equipment and facilities available in other MIT labs and Centers. Some examples include
Code of Federal Regulations, 2014 CFR
2014-01-01
... emergency power to instruments, utility service systems, and operating systems important to safety if there... include: (a) A general description of the structures, systems, components, equipment, and process... of the performance of the structures, systems, and components to identify those that are important to...
Code of Federal Regulations, 2013 CFR
2013-01-01
... emergency power to instruments, utility service systems, and operating systems important to safety if there... include: (a) A general description of the structures, systems, components, equipment, and process... of the performance of the structures, systems, and components to identify those that are important to...
Code of Federal Regulations, 2012 CFR
2012-01-01
... emergency power to instruments, utility service systems, and operating systems important to safety if there... include: (a) A general description of the structures, systems, components, equipment, and process... of the performance of the structures, systems, and components to identify those that are important to...
Code of Federal Regulations, 2011 CFR
2011-01-01
... emergency power to instruments, utility service systems, and operating systems important to safety if there... include: (a) A general description of the structures, systems, components, equipment, and process... of the performance of the structures, systems, and components to identify those that are important to...
ERIC Educational Resources Information Center
WHITING, RICHARD; AND OTHERS
NOVA IS AN EXPERIMENTAL, 6-YEAR JUNIOR-SENIOR HIGH SCHOOL. ASPECTS OF THE PROGRAM INCLUDE THE TRIMESTER SYSTEM, THE CONTINUOUS PROGRESS CURRICULUM, TEAM TEACHING, A CLASS SCHEDULE OF FOUR 70-MINUTE PERIODS PER WEEK, THE USE OF DATA-PROCESSING EQUIPMENT, AND MODERN INSTRUCTIONAL AIDS. NOVA IS ORGANIZED CAMPUS-STYLE WITH INDIVIDUAL BUILDINGS DEVOTED…
Burlakov, R I; Iurevich, V M
1981-01-01
The authors proved the advisability of complex technical provision for certain functional cycles, or parts of medical technological process. The example given is a modification of working place for anesthesiologist at the operating theatre. Principle and additional devices included in the complex are specified.
Low-cost solar array project and Proceedings of the 15th Project Integration Meeting
NASA Technical Reports Server (NTRS)
1980-01-01
Progress made by the Low-Cost Solar Array Project during the period December 1979 to April 1980 is described. Project analysis and integration, technology development in silicon material, large area silicon sheet and encapsulation, production process and equipment development, engineering, and operation are included.
32 CFR Appendix A to Part 223 - Procedures for Identifying and Controlling DoD UCNI
Code of Federal Regulations, 2011 CFR
2011-07-01
... security measures, including security plans, procedures, and equipment, for the physical protection of DoD... stand-alone personal computers, or shared-logic work processing systems, if protection from unauthorized... and security by increasing significantly the likelihood of the illegal production of nuclear weapons...
Safety Analysis of Soybean Processing for Advanced Life Support
NASA Technical Reports Server (NTRS)
Hentges, Dawn L.
1999-01-01
Soybeans (cv. Hoyt) is one of the crops planned for food production within the Advanced Life Support System Integration Testbed (ALSSIT), a proposed habitat simulation for long duration lunar/Mars missions. Soybeans may be processed into a variety of food products, including soymilk, tofu, and tempeh. Due to the closed environmental system and importance of crew health maintenance, food safety is a primary concern on long duration space missions. Identification of the food safety hazards and critical control points associated with the closed ALSSIT system is essential for the development of safe food processing techniques and equipment. A Hazard Analysis Critical Control Point (HACCP) model was developed to reflect proposed production and processing protocols for ALSSIT soybeans. Soybean processing was placed in the type III risk category. During the processing of ALSSIT-grown soybeans, critical control points were identified to control microbiological hazards, particularly mycotoxins, and chemical hazards from antinutrients. Critical limits were suggested at each CCP. Food safety recommendations regarding the hazards and risks associated with growing, harvesting, and processing soybeans; biomass management; and use of multifunctional equipment were made in consideration of the limitations and restraints of the closed ALSSIT.
Strategies for Buying and Maintaining Audio Visual Equipment.
ERIC Educational Resources Information Center
Kalmbach, John A.; Kruzel, Richard D.
1989-01-01
Presents guidelines for purchasing and maintaining audiovisual equipment most often used in the classroom. Highlights include selecting a vendor; purchasing associations; preventive maintenance; optical equipment, including overhead projectors, slide projectors, movie projectors, and filmstrip projectors; and electromagnetic equipment, including…
Code of Federal Regulations, 2010 CFR
2010-07-01
... equipment used in research and development if the reactor used to polymerize the vinyl chloride processed in the equipment has a capacity of no more than 0.19 m 3 (50 gal). (c) Sections of this subpart other... equipment used in research and development if the reactor used to polymerize the vinyl chloride processed in...
Automated Rapid Prototyping of 3D Ceramic Parts
NASA Technical Reports Server (NTRS)
McMillin, Scott G.; Griffin, Eugene A.; Griffin, Curtis W.; Coles, Peter W. H.; Engle, James D.
2005-01-01
An automated system of manufacturing equipment produces three-dimensional (3D) ceramic parts specified by computational models of the parts. The system implements an advanced, automated version of a generic rapid-prototyping process in which the fabrication of an object having a possibly complex 3D shape includes stacking of thin sheets, the outlines of which closely approximate the horizontal cross sections of the object at their respective heights. In this process, the thin sheets are made of a ceramic precursor material, and the stack is subsequently heated to transform it into a unitary ceramic object. In addition to the computer used to generate the computational model of the part to be fabricated, the equipment used in this process includes: 1) A commercially available laminated-object-manufacturing machine that was originally designed for building woodlike 3D objects from paper and was modified to accept sheets of ceramic precursor material, and 2) A machine designed specifically to feed single sheets of ceramic precursor material to the laminated-object-manufacturing machine. Like other rapid-prototyping processes that utilize stacking of thin sheets, this process begins with generation of the computational model of the part to be fabricated, followed by computational sectioning of the part into layers of predetermined thickness that collectively define the shape of the part. Information about each layer is transmitted to rapid-prototyping equipment, where the part is built layer by layer. What distinguishes this process from other rapid-prototyping processes that utilize stacking of thin sheets are the details of the machines and the actions that they perform. In this process, flexible sheets of ceramic precursor material (called "green" ceramic sheets) suitable for lamination are produced by tape casting. The binder used in the tape casting is specially formulated to enable lamination of layers with little or no applied heat or pressure. The tape is cut into individual sheets, which are stacked in the sheet-feeding machine until used. The sheet-feeding machine can hold enough sheets for about 8 hours of continuous operation.
UOE Pipe Manufacturing Process Simulation: Equipment Designing and Construction
NASA Astrophysics Data System (ADS)
Delistoian, Dmitri; Chirchor, Mihael
2017-12-01
UOE pipe manufacturing process influence directly on pipeline resilience and operation capacity. At present most spreaded pipe manufacturing method is UOE. This method is based on cold forming. After each technological step appears a certain stress and strain level. For pipe stress strain study is designed and constructed special equipment that simulate entire technological process.UOE pipe equipment is dedicated for manufacturing of longitudinally submerged arc welded DN 400 (16 inch) steel pipe.
NASA Technical Reports Server (NTRS)
1986-01-01
Activities that will be conducted in support of the development and verification of the Block 2 Solid Rocket Motor (SRM) are described. Development includes design, fabrication, processing, and testing activities in which the results are fed back into the project. Verification includes analytical and test activities which demonstrate SRM component/subassembly/assembly capability to perform its intended function. The management organization responsible for formulating and implementing the verification program is introduced. It also identifies the controls which will monitor and track the verification program. Integral with the design and certification of the SRM are other pieces of equipment used in transportation, handling, and testing which influence the reliability and maintainability of the SRM configuration. The certification of this equipment is also discussed.
"Reliability Of Fiber Optic Lans"
NASA Astrophysics Data System (ADS)
Code n, Michael; Scholl, Frederick; Hatfield, W. Bryan
1987-02-01
Fiber optic Local Area Network Systems are being used to interconnect increasing numbers of nodes. These nodes may include office computer peripherals and terminals, PBX switches, process control equipment and sensors, automated machine tools and robots, and military telemetry and communications equipment. The extensive shared base of capital resources in each system requires that the fiber optic LAN meet stringent reliability and maintainability requirements. These requirements are met by proper system design and by suitable manufacturing and quality procedures at all levels of a vertically integrated manufacturing operation. We will describe the reliability and maintainability of Codenoll's passive star based systems. These include LAN systems compatible with Ethernet (IEEE 802.3) and MAP (IEEE 802.4), and software compatible with IBM Token Ring (IEEE 802.5). No single point of failure exists in this system architecture.
Medical technology management: from planning to application.
David, Y; Jahnke, E
2005-01-01
Appropriate deployment of technological innovation contributes to improvement in the quality of healthcare delivered, the containment of cost, and access to the healthcare system. Hospitals have been allocating a significant portion of their resources to procuring and managing capital assets; they are continuously faced with demands for new medical equipment and are asked to manage existing inventory for which they are not well prepared. To objectively manage their investment, hospitals are developing medical technology management programs that need pertinent information and planning methodology for integrating new equipment into existing operations as well as for optimizing costs of ownership of all equipment. Clinical engineers can identify technological solutions based on the matching of new medical equipment with hospital's objectives. They can review their institution's overall technological position, determine strengths and weaknesses, develop equipment-selection criteria, supervise installations, train users and monitor post procurement performance to assure meeting of goals. This program, together with cost accounting analysis, will objectively guide the capital assets decision-making process. Cost accounting analysis is a multivariate function that includes determining the amount, based upon a strategic plan and financial resources, of funding to be allocated annually for medical equipment acquisition and replacement. Often this function works closely with clinical engineering to establish equipment useful life and prioritization of acquisition, upgrade, and replacement of inventory within budget confines and without conducting time consuming, individual financial capital project evaluations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... automatic data processing equipment, word processing, and similar types of commercially available equipment... CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Purchase Orders 1513.507 Clauses. (a) It is the general...
14. Implementation, execution, and completion of projects.
2014-05-01
Once an intervention has been selected for implementation, it becomes a project. Implementation of a project is a complex process and requires completion of a host of tasks. The implementation process has been deconstructed into its components so that it can be analysed and evaluated. A prerequisite for implementation is an operational plan. The tasks that require completion include: (1) reassessing current status and verifying the needs; (2) activating the operational plan; (3) setting-up and operating an administrative structure; (4) identifying, acquiring, and organising resources (including human resources); (5) assigning roles and responsibilities; (6) educating and training personnel (including mission-specific); (7) briefing staff; (8) preparing/readying resources for transport; (9) assuring project self-sufficiency; (10) arranging for personal necessities; (11) ensuring the safety of personnel and the security of equipment and supplies; (12) insuring personnel; (13) coordinating with other projects/actors; (14) coordinating with other BSF systems (role of the coordination and control centre); (15) communicating with community leaders; (16) initiating the use of standardised progress reports; (17) deploying personnel, equipment, and supplies; (18) initiating the intervention(s); (19) executing the intervention(s); (20) reporting start of interventions; (21) completing the project; and (22) completing and submitting a formal report. This deconstruction is essential in order to study the process and identify critical points of success and failure. It also is recognised that many interventions consist of many components (subfunctions), each of which may be considered a production process.
1998-12-01
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, Center Director Roy Bridges (left), Program Manager of the International Space Station (ISS) Randy Brinkley (second from left) and STS-98 Commander Ken Cockrell (right) applaud the unveiling of the name "Destiny" for the U.S. Laboratory module. The lab, which is behnd them on a workstand, is scheduled to be launched on STS-98 on Space Shuttle Endeavour in early 2000. It will become the centerpiece of scientific research on the ISS. The Shuttle will spend six days docked to the Station while the laboratory is attached and three spacewalks are conducted to compete its assembly. The laboratory will be launched with five equipment racks aboard, which will provide essential functions for Station systems, including high data-rate communications, and maintain the Station's orientation using control gyroscopes launched earlier. Additional equipment and research racks will be installed in the laboratory on subsequent Shuttle flights.
2007-09-28
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-122 crew members practice working with equipment for the mission. From left are Commander Stephen Frick and Mission Specialists Hans Schlegel, Rex Walheim and Stanley Love. Schlegel represents the European Space Agency. The crew is at Kennedy Space Center to take part in a crew equipment interface test, which includes equipment familiarization. The mission will carry and install the Columbus Lab, a multifunctional, pressurized laboratory that will be permanently attached to Node 2 of the space station to carry out experiments in materials science, fluid physics and biosciences, as well as to perform a number of technological applications. It is Europe’s largest contribution to the construction of the International Space Station and will support scientific and technological research in a microgravity environment. STS-122 is targeted for launch in December. Photo credit: NASA/Kim Shiflett