Procurement Work Directive ( PWV ) Procurement Army, CostL to Procure Cost Differential Secondary (PAS) Cost to Buy Economic Order Quantity Procurement...and Assignment of Buyer h. Solicitation Fffort . ) (1) Procurement Planning ( ) ( ) (?) PWV Review and Small Business Coordination ( (3) Determination
Annual Procurement Report, Fiscal Year 1997
NASA Technical Reports Server (NTRS)
1997-01-01
This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1997. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during Fiscal Year 1997. However, these larger procurements accounted for only 43 percent of the total actions. Procurement action, as used in this report means contractual actions to obtain supplies, services or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or termination's to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract. The Annual Procurement Report is also available via the internet on the Procurement homepage.
78 FR 46239 - Designations of Chief Acquisition Officer and Senior Procurement Executive
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
... Designations of Chief Acquisition Officer and Senior Procurement Executive and Delegation of Procurement... No. FR-5701-D-01] Designations of Chief Acquisition Officer and Senior Procurement Executive AGENCY... Procurement Officer as the Senior Procurement Executive. DATES: Effective Date: July 24, 2013. FOR FURTHER...
48 CFR 752.225-71 - Local procurement.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...
48 CFR 752.225-71 - Local procurement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...
NASA procurement report, FY 1992
NASA Technical Reports Server (NTRS)
1992-01-01
This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during the first six months of Fiscal Year 1992. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during the first six months of Fiscal Year 1992. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplementary agreements, change orders, or terminations to a contract that change the total amount of funds obligated.
Transformation of fraud activities in procurement system in Indonesia
NASA Astrophysics Data System (ADS)
Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.
2017-03-01
E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.
Sørensen, Nina N; Lassen, Anne D; Løje, Hanne; Tetens, Inge
2015-09-01
With political support from the Danish Organic Action Plan 2020, organic public procurement in Denmark is expected to increase. In order to evaluate changes in organic food procurement in Danish public kitchens, reliable methods are needed. The present study aimed to compare organic food procurement measurements by two methods and to collect and discuss baseline organic food procurement measurements from public kitchens participating in the Danish Organic Action Plan 2020. Comparison study measuring organic food procurement by applying two different methods, one based on the use of procurement invoices (the Organic Cuisine Label method) and the other on self-reported procurement (the Dogme method). Baseline organic food procurement status was based on organic food procurement measurements and background information from public kitchens. Public kitchens participating in the six organic food conversion projects funded by the Danish Organic Action Plan 2020 during 2012 and 2013. Twenty-six public kitchens (comparison study) and 345 public kitchens (baseline organic food procurement status). A high significant correlation coefficient was found between the two organic food procurement measurement methods (r=0·83, P<0·001) with measurements relevant for the baseline status. Mean baseline organic food procurement was found to be 24 % when including measurements from both methods. The results indicate that organic food procurement measurements by both methods were valid for the baseline status report of the Danish Organic Action Plan 2020. Baseline results in Danish public kitchens suggest there is room for more organic as well as sustainable public procurement in Denmark.
NASA procurement report, FY 1993
NASA Technical Reports Server (NTRS)
1993-01-01
Summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during fiscal year 1993. The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during fiscal year 1993. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractural actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
DOT National Transportation Integrated Search
2007-09-01
Traditional state procurement processes are not well-suited to the procurement of Intelligent Transportation Systems (ITS). The objective of this study was to analyze Kentuckys existing procurement processes, identify strengths and weaknesses of e...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
23 CFR 172.5 - Methods of procurement.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated... negotiation. Contracting agencies shall use competitive negotiation for the procurement of engineering and...
22 CFR 201.23 - Procurement under private sector procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement under private sector procedures... § 201.23 Procurement under private sector procedures. (a) General requirements. Procurements under private sector procedures will normally be carried out by importers using negotiated procurement...
Summary data on all NASA procurement actions
NASA Technical Reports Server (NTRS)
1992-01-01
This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1992 (FY-92). The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during FY-92. However, these larger procurements accounted for only 28 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.
75 FR 13262 - Procurement List Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
...: Additions to and deletions from the Procurement List. SUMMARY: This action adds to the Procurement List a... severe disabilities, and deletes from the Procurement List services previously furnished by such agencies... Severely Disabled published notices of proposed additions to the Procurement List. After consideration of...
75 FR 49481 - Procurement List; Additions and Deletion
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-13
... added to the Procurement List: Services Service Type/Locations: Laundry Service, Atlanta VA Medical...: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities and deletes a service from the Procurement List previously furnished by such agency. DATES...
Public perspectives on biospecimen procurement: what biorepositories should consider.
L'Heureux, Jamie; Murray, Jeffrey C; Newbury, Elizabeth; Shinkunas, Laura; Simon, Christian M
2013-06-01
Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus "direct" procurement strategies such as the drawing of blood. Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens.
77 FR 11071 - Procurement List; Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
...: Additions to and Deletions from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies... People Who Are Blind or Severely Disabled published notices of proposed additions to the Procurement List...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
75 FR 4784 - Procurement List; Addition
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
... Procurement List. SUMMARY: This action adds to the Procurement List a service to be furnished by a nonprofit... Who Are Blind or Severely Disabled published a notice of proposed addition to the Procurement List... Committee has determined that the service listed below is suitable for procurement by the Federal Government...
14 CFR § 1201.400 - NASA procurement program.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NASA procurement program. § 1201.400... ORGANIZATION AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
22 CFR 1006.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Are any procurement contracts included as... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1006.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
21 CFR 1404.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
21 CFR 1404.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
34 CFR 85.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 1 2010-07-01 2010-07-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 85.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
Public Perspectives on Biospecimen Procurement: What Biorepositories Should Consider
L'Heureux, Jamie; Murray, Jeffrey C.; Newbury, Elizabeth; Shinkunas, Laura
2013-01-01
Purpose Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus “direct” procurement strategies such as the drawing of blood. Methods Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. Results The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Conclusion Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens. PMID:24850089
13 CFR 121.407 - What are the size procedures for multiple item procurements?
Code of Federal Regulations, 2010 CFR
2010-01-01
... Requirements for Government Procurement § 121.407 What are the size procedures for multiple item procurements? If a procurement calls for two or more specific end items or types of services with different size... multiple item procurements? 121.407 Section 121.407 Business Credit and Assistance SMALL BUSINESS...
Baughn, Daniel; Auerbach, Stephen M; Siminoff, Laura A
2010-09-01
Interpersonal relations with health care providers influence families' decisions to consent to solid-organ donation. However, previous research has been based on retrospective interviews with donation-eligible families and has not directly examined the interpersonal interactions between families and organ procurement coordinators. To increase understanding of the interpersonal interaction between procurement coordinators and families during the organ donation discussion, with special attention to the influence of the sex and race of the procurement coordinator and the race of the potential donor's family. A descriptive study in which standardized patients portrayed family members interacting with actual procurement coordinators in simulated donation request scenarios. Thirty-three videotaped interactions between standardized patients and 17 procurement coordinators involving 2 different scenarios depicting deceased donation were evaluated. Video recordings were rated by independent coders. Coders completed the Impact Message Inventory-Form C, the Participatory Style of Physician Scale, and the Siminoff Communication and Content and Affect Program-Global Observer Ratings scale. African American procurement coordinators, particularly African American women, were rated as more controlling and work-oriented than white procurement coordinators. Male procurement coordinators were more affiliative with the white family than the African American family, whereas female procurement coordinators were slightly less affiliative with the white family. African American procurement coordinators expressed more positive affect when interacting with the African American family than the white family, whereas the opposite was true for white procurement coordinators. Research is needed to cross-validate these exploratory findings and further examine cultural mistrust between procurement coordinators and families of ethnic minorities, especially given the negative attitudes of many minorities toward donation.
Acquisition-Management Program
NASA Technical Reports Server (NTRS)
Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.
1987-01-01
NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.
Chokshi, Maulik; Farooqui, Habib Hasan; Selvaraj, Sakthivel; Kumar, Preeti
2015-01-01
In India, access to medicine in the public sector is significantly affected by the efficiency of the drug procurement system and allied processes and policies. This study was conducted in two socioeconomically different states: Bihar and Tamil Nadu. Both have a pooled procurement system for drugs but follow different models. In Bihar, the volumes of medicines required are pooled at the state level and rate contracted (an open tender process invites bidders to quote for the lowest rate for the list of medicines), while actual invoicing and payment are done at district level. In Tamil Nadu, medicine quantities are also pooled at state level but payments are also processed at state level upon receipt of laboratory quality-assurance reports on the medicines. In this cross-sectional survey, a range of financial and non-financial data related to procurement and distribution of medicine, such as budget documents, annual reports, tender documents, details of orders issued, passbook details and policy and guidelines for procurement were analysed. In addition, a so-called ABC analysis of the procurement data was done to to identify high-value medicines. It was observed that Tamil Nadu had suppliers for 100% of the drugs on their procurement list at the end of the procurement processes in 2006, 2007 and 2008, whereas Bihar's procurement agency was only able to get suppliers for 56%, 59% and 38% of drugs during the same period. Further, it was observed that Bihar's system was fuelling irrational procurement; for example, fluconazole (antifungal) alone was consuming 23.4% of the state's drug budget and was being procured by around 34% of the districts during 2008-2009. Also, the ratios of procurement prices for Bihar compared with Tamil Nadu were in the range of 1.01 to 22.50. For 50% of the analysed drugs, the price ratio was more than 2, that is, Bihar's procurement system was procuring the same medicines at more than twice the prices paid by Tamil Nadu. Centralized, automated pooled procurement models like that of Tamil Nadu are key to achieving the best procurement prices and highest possible access to medicines.
41 CFR 101-26.505-3 - Requests to procure similar items from sources other than GSA supply sources.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requests to procure... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26...
Donor and procurement related issues in vascularized composite allograft transplantation.
McDiarmid, Sue V
2013-12-01
To understand the unique requirements of vascularized composite allograft (VCA) donation and procurement practices and the integral role of the established nationwide organ procurement organizations in organ procurement. The recent issuance of a Final Rule (July 2013) by the United States Secretary of Health that redefines VCAs as organs rather than tissues, opens up the potential to formalize policies and procedures, under the auspices of the Organ Procurement and Transplantation Network, that can improve VCA donation, procurement practices, develop allocation algorithms and provide transparent oversight. Improved VCA donation rates, procurement procedures and broader sharing nationwide of VCA donors will have important implications in advancing the emerging field of VCA transplantation.
Ohkawara, H; Fukushima, N; Kitagawa, T; Ito, T; Masutani, Y; Sawa, Y
2010-01-01
Although organ procurement has been regulated by The Organ Transplantation Law (brain-dead donors since 1997, donors after cardiac death since 1979), there has been no law or governmental procurement network (except for cornea) in Japan. Since the late 1980s, some university hospitals have developed original banks. Finally, in 2001 guidelines for tissue procurement were established by The Japanese Society of Tissue Transplantation and Japan Tissue Transplant Network (JTTN) to coordinate tissue harvesting. Five tissue banks were joined to the tissue transplant network (skin in one, heart valves in two, and bone in two). As the number of tissue banks is small, each bank cooperates on procurement, but cannot cover the entire country. With regard to skin transplantation, only one skin bank-The Japan Skin Bank Network (JSBN), which is located in Tokyo-has organized skin procurement. Therefore, it has been difficult to procure skin in areas distant from Tokyo, especially around Osaka. In order to improve such a situation, a tissue bank collaborating with the JSBN was established at The Medical Center for Translational Research (MTR), Osaka University Hospital in April 2008. The bank has played a role in skin procurement center in western Japan and supported procurement and preservation at the time of the skin procurement. Between April 2008 and September 2009, the bank participated in eight tissue procurements in the western area. In the future, the bank is planning to procure and preserve pancreatic islets and bones. Moreover, there is a plan to set up an induced pluripotent stem cells center and stem cell bank in MTR. This tissue bank may play a role to increase tissue procurement in Japan, especially in the western area. .
1985-09-01
courses for a concentration in procurement and materials management: Procurement and Materials Management Procurement Contract Law Systems Procurement...for contracting in the public sector (Procurement Contract Law ). The respondents did not agree as much with this question as they did with the...the results of this section proved quite different from the group as a whole. Contract Law , Contract Negotiations, Pricing, Procurement Management
Thrailkill, Eric A.; Bouton, Mark E.
2015-01-01
Instrumental behavior often consists of sequences or chains of responses that minimally include procurement behaviors that enable subsequent consumption behaviors. In such chains, behavioral units are linked by access to one another and eventually to a primary reinforcer, such as food or a drug. The present experiments examined the effects of extinguishing procurement responding on consumption responding after training of a discriminated heterogeneous instrumental chain. Rats learned to make a procurement response (e.g., pressing a lever) in the presence of a distinctive discriminative stimulus; making that response led to the presentation of a second discriminative stimulus that set the occasion for a consumption response (e.g., pulling a chain), which then produced a food-pellet reinforcer. Experiment 1 showed that extinction of either the full procurement-consumption chain or procurement alone weakened the consumption response tested in isolation. Experiment 2 replicated the procurement extinction effect and further demonstrated that the opportunity to make the procurement response, as opposed to simple exposure to the procurement stimulus alone, was required. In Experiment 3, rats learned 2 distinct discriminated heterogeneous chains; extinction of 1 procurement response specifically weakened the consumption response that had been associated with it. The results suggest that learning to inhibit the procurement response may produce extinction of consumption responding through mediated extinction. The experiments suggest the importance of an associative analysis of instrumental behavior chains. PMID:25915751
Lannau, B; Van Geyt, C; Van Maele, G; Beele, H
2015-03-01
During the procurement of musculoskeletal grafts contamination may occur. As this might be detrimental for the acceptor, it is important to know which variables influence this occurrence and to alter procurement protocols accordingly. From 2004 to 2012 we gathered information on 6,428 allografts obtained from 291 donors. Using a multiple regression model we attempted to determine the factors that influence the contamination risk during procurement. We used the following variables: cause of death, type of hospital (i.e. university hospital vs. general hospital), previous blood vessel donation, previous organ donation, donor age, time between death and the start of the procurement, duration of the procurement, number of people attending the procurement and the number of procured grafts. The multiple regression model was only able to explain 5 % of the variability of the used outcome variable. None of the variables examined appear to have an important influence on the contamination risk.
Tissue procurement and transplantation: a Tuscany perspective.
Filipponi, F; De Simone, P; Saviozzi, A; Bozzi, G
2008-01-01
Tissue procurement and transplantation are rarely taken into account as indicators of the efficiency of a regional donor procurement network. We present herein a retrospective review on Tuscany tissue procurement activities from 2004 until 2006. In 2003 the Tuscan Regional Government appointed a transplantation service authority to reorganize all regional donation and transplantation activities: the Organizzazione Toscana Trapianti (OTT). The regional tissue procurement network was based on either brain death (BD) and cardiac death (CD) donors under the responsibility of in-hospital transplantation coordinators (IHTCs). From 2004 to 2006, a total of 397 tissue donors were procured in Tuscany, and 4151 tissue transplantations were performed: 2909 skin grafts, 1209 bone grafts, and 33 heart valves. Over the same period, a total of 2116 cornea donors were procured; 4117 corneas were retrieved; 1779 were fit for transplantation, and 1418 were transplanted. Based on our experience, implementation of tissue procurement requires use of BD donors and paramount organizational efforts from IHTCs.
Procurement Procurement The National Renewable Energy Laboratory (NREL) offers numerous procurement source of biofuels. Register Your Small Business NREL welcomes small, disadvantaged, HUBzone, veteran -owned, and women-owned business vendors and subcontractors. Register today
DOT National Transportation Integrated Search
2013-04-01
Established in 1995 as the Florida Vehicle : Procurement Program (FVPP), Florida Transit : Research Inspection Procurement Services (TRIPS) : is a vehicle sourcing and procurement system for : Floridas public transit agencies that integrates : ins...
Applying e-procurement system in the healthcare: the EPOS paradigm
NASA Astrophysics Data System (ADS)
Ketikidis, Panayiotis H.; Kontogeorgis, Apostolos; Stalidis, George; Kaggelides, Kostis
2010-03-01
One of the goals of procurement is to establish a competitive price, while e-procurement utilises electronic commerce to identify potential sources of supply, to purchase goods and services, to exchange contractual information and to interact with suppliers. Extensive academic work has been extensively devoted to e-procurement in diverse industries. However, applying e-procurement in the healthcare sector remains unexplored. It lacks an efficient e-procurement mechanism that will enable hospitals and healthcare suppliers to electronically exchange contractual information, aided by the technologies of optimisation and business rules. The development and deployment of e-procurement requires a major effort in the coordination of complex interorganisational business process. This article presents an e-procurement optimised system (EPOS) for the healthcare marketplace, a complete methodological approach for deploying and operating such system, as piloted in public and private hospitals in three European countries (Greece, Spain and Belgium) and suppliers of healthcare items in the fourth country (Italy). The efficient e-procurement mechanism that EPOS suggests enables hospitals and pharmaceutical and medical equipment suppliers to electronically exchange contractual information.
NASA Astrophysics Data System (ADS)
Alard, Robert; Gustafsson, Martin; Nienhaus, Jörg
The management of buyer-supplier relations is a major topic for many enterprises today. Modern Information and Communication Technologies (ICT) offer interesting perspectives on opportunities and implementation approaches. Today, logistics and procurement departments of numerous enterprises are evaluating the possibilities and opportunities of new ICT solutions and especially of internet-based electronic procurement solutions for the optimisation and re-engineering of their buyer-supplier relationships. Due to the highly innovative character of the new ICT solutions and the scarcely available operational examples in the industry, only little guidance exists to support responsible managers during the evaluation, planning and designing of internet-based electronic procurement solutions. This paper describes a framework for the strategic evaluation and planning of the deployment of internet-based procurement solutions for direct materials. The presented approach supports enterprises in the analysis of procurement objects and procurement structuring, in the definition and management of buyer-supplier-relationships, in the requirements analysis of ICT solutions as well as the assessment of the potential to support procurement with innovative ICT and internet-based electronic procurement solutions.
24 CFR 963.12 - Alternative procurement process.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT PUBLIC HOUSING-CONTRACTING WITH RESIDENT-OWNED BUSINESSES Contracting With Resident-Owned Businesses § 963.12 Alternative procurement process. (a) Method of procurement. In contracting with resident-owned businesses, the PHA shall follow the applicable method of procurement as set forth...
Caremans, Jeroen; Hamans, Evert; Muylle, Ludo; Van de Heyning, Paul; Van Rompaey, Vincent
2016-06-01
Allograft tympano-ossicular systems (ATOS) have proven their use over many decades in tympanoplasty and reconstruction after resection of cholesteatoma. The transcranial bone plug technique has been used in the past 50 years to procure en bloc ATOS (tympanic membrane with malleus, incus and stapes attached). Recently, our group reported the feasibility of the endoscopic procurement technique. The aim of this study was to assess whether clinical outcome is equivalent in ATOS acquired by using the endoscopic procurement technique compared to ATOS acquired by using the transcranial technique. A double-blind randomized controlled audit was performed in a tertiary referral center in patients that underwent allograft tympanoplasty because of chronic otitis media with and without cholesteatoma. Allograft epithelialisation was evaluated at the short-term postoperative visit by microscopic examination. Failures were reported if reperforation was observed. Fifty patients underwent allograft tympanoplasty: 34 received endoscopically procured ATOS and 16 received transcranially procured ATOS. One failed case was observed, in the endoscopic procurement group. We did not observe a statistically significant difference between the two groups in failure rate. This study demonstrates equivalence of the clinical outcome of allograft tympanoplasty using either endoscopic or transcranial procured ATOS and therefore indicates that the endoscopic technique can be considered the new standard procurement technique. Especially because the endoscopic procurement technique has several advantages compared to the former transcranial procurement technique: it avoids risk of prion transmission and it is faster while lacking any noticeable incision.
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 12 2012-01-01 2012-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 12 2013-01-01 2013-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 12 2014-01-01 2013-01-01 true Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 12 2011-01-01 2011-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
22 CFR 226.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement records. 226.46 Section 226.46 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.46 Procurement records...
76 FR 12016 - Local and Regional Food Aid Procurement Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-04
... DEPARTMENT OF AGRICULTURE Foreign Agricultural Service Local and Regional Food Aid Procurement... field-based projects under the USDA Local and Regional Food Aid Procurement Pilot Project (USDA LRP..., 2011. FOR FURTHER INFORMATION CONTACT: Jamie Fisher, Chief, Local and Regional Procurement, Food...
48 CFR 2401.601-70 - Senior Procurement Executive.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Senior Procurement... Authority, and Responsibilities 2401.601-70 Senior Procurement Executive. Unless otherwise designated by the Secretary through a delegation of authority, the Chief Procurement Officer is the Department's Senior...
78 FR 20783 - Designation of Product Categories for Federal Procurement; Withdrawal
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-08
... Designation of Product Categories for Federal Procurement; Withdrawal AGENCY: Office of Procurement and.... Department of Agriculture (USDA) is withdrawing the final rule ``Designation of Product Categories for... product categories within which biobased products will be afforded Federal procurement preference, was...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 2 2010-07-01 2010-07-01 false Procurement. 203.13 Section 203.13 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS... small businesses, and will be conducted as competitive procurements. Procurements below a value of $2...
48 CFR 702.170-13 - Procurement Executive.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Procurement Executive. 702.170-13 Section 702.170-13 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL DEFINITIONS OF WORDS AND TERMS Definitions 702.170-13 Procurement Executive. “Procurement...
10 CFR 436.43 - Procurement planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Procurement planning. 436.43 Section 436.43 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Agency Procurement of Energy Efficient Products § 436.43 Procurement planning. (a) Agencies should consider the...
23 CFR 172.5 - Methods of procurement.
Code of Federal Regulations, 2010 CFR
2010-04-01
... proposal solicitation (project, task, or service) process shall be by public announcement, advertisement... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated...
Code of Federal Regulations, 2011 CFR
2011-07-01
... LITIGATION Remedies in Procurement Fraud and Corruption § 516.58 Policies. (a) Procurement fraud and... administrative remedies in significant cases of fraud or corruption relating to Army procurement. (d) The key... of fraud or corruption involving procurement. (g) Coordination on the status and disposition of cases...
Ethics and regulation in organ procurement research.
Ackerman, Terrence F; Winsett, Rebecca P
2002-12-01
This article explores the role of ethics and regulation in human research conducted by organ procurement agencies; basic ethical principles for human research are outlined. Organ procurement agencies are not required to observe federal regulations; however, voluntary adherence will ensure that procurement research is conducted according to current standards of ethical practice. Although most organ procurement research will qualify for exempt status, this determination should be made by an institutional review board. Even if studies qualify for exempt status, there is a moral presumption that informed consent should be sought, unless certain narrow conditions for waiver of consent are satisfied. Finally, when future research utilizing organ procurement records is anticipated, procurement coordinators should provide sufficiently detailed information to families about such plans to permit their advance informed consent to research activities.
7 CFR 1778.22 - Planning development and procurement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 12 2011-01-01 2011-01-01 false Planning development and procurement. 1778.22 Section 1778.22 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE... Planning development and procurement. Planning development and procurement for grants made under this part...
Procurement Career Management Handbook.
ERIC Educational Resources Information Center
Department of the Treasury, Washington, DC.
This handbook is the result of the Treasury Department's efforts to increase professionalism among its procurement employees nationwide through its Procurement Career Management Program. First, the scope and objectives of the Procurement Career Management Program are discussed. The remaining sections of the handbook deal with the following program…
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 3 2014-07-01 2014-07-01 false Procurement. 553.11 Section 553.11 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES ARMY NATIONAL CEMETERIES § 553.11 Procurement. Cemetery supplies and services will be procured in...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data... close of the fourth quarter. Specific preparation procedures are contained in the FPDS Reporting Manual...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data... close of the fourth quarter. Specific preparation procedures are contained in the FPDS Reporting Manual...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...
Proceedings: 1990 EPRI gas turbine procurement seminar
DOE Office of Scientific and Technical Information (OSTI.GOV)
McDonald, B.L.; Miller, M.N.
1991-06-01
This seminar presents information that enables utilities to implement more cost-effective procurements for gas turbine and combined-cycle power generation equipment. A systematic approach to specification and permitting procedures can lower unit life-cycle cost. APPROACH. Thirty-two staff members from 25 utilities met in Danvers, Massachusetts, October 9--11, 1990. Speakers representing utilities, vendors, and EPRI contractors presented material on recent procurement and startup experiences, permitting considerations, specification strategy, bid evaluation techniques, and a vendor's perspective of utility procurements. KEY POINTS. The seminar focused on specification features, procurement procedures, and bid evaluation techniques designed to implement life-cycle cost-effective procurement consistent with the plantmore » mission. Speakers highlighted the following issues: Experiential case histories of recent procurements and startups, emphasizing how to design procurement procedures that improve plant operating economics; Current trends in permitting for NO{sub x} compliance and recent permitting experience; Quantifiable evaluations of vendors' bids for RAM-related characteristics; The means to obtain specifically desired but nonstandard equipment features.« less
Survey of U.S. Organ Procurement Organizations Regarding Pediatric Organ Donor Management.
Ream, Robert S; Armbrecht, Eric S
2016-10-01
To describe the current practice of pediatric organ donor management in the United States for donors declared dead based upon neurologic criteria. The study directs particular attention to how pediatric donors are defined, the use of donor management guidelines, the use of donor management goals, and the involvement of pediatric critical care or transplantation expertise. Cross-sectional observational study using a web-based survey and follow-up telephone interview with respondents from U.S. organ procurement organizations. The study also incorporated organ procurement organization-specific data on organ yield for the 4-year period (2010-2013) preceding the study. The 58 U.S. organ procurement organizations. Respondents chosen by each organ procurement organization. None. All 58 U.S. organ procurement organizations participated in the study. Fifty-two respondents (90%) indicated that their organ procurement organization distinguished pediatric from adult donors resulting in 28 unique pediatric definitions. Thirty-nine organ procurement organizations utilized some form of written pediatric management guidelines, and 27 (47%) maintained pediatric donor management goals; compliance was infrequently monitored for both guidelines (28%) and goals (33%). A pediatric intensivist was always or usually involved in pediatric donor management at 47 organ procurement organizations (81%); transplant/organ recovery surgeons were always or usually involved at 12 organ procurement organizations (21%). There was an increase in the number of organs transplanted per donor among donors 11-17 years old for organ procurement organizations that used donor management goals for the duration of the period studied (p < 0.01). There was also an increase in the ratio of observed/expected organs transplanted among donors of 0-10 years old for organ procurement organizations that always or usually consulted a transplant/organ recovery surgeon (p = 0.02) although this did not reach our threshold for statistical significance.. There is little consensus among organ procurement organizations regarding the definition of "pediatric" during organ donor management. Most organ procurement organizations employ written pediatric guidelines and use pediatric intensive care physicians for assistance in managing these donors. There is a positive association between the use of donor management goals and organ yield among pediatric donors in the 11- to 17-year age group.
Lingg, Myriam; Wyss, Kaspar; Durán-Arenas, Luis
2016-08-08
We know little about how procurement of a high-risk medical device (HRMD) affects clinical practice and outcomes. In health systems in high-income countries, and specifically those that maintain a national arthroplasty registry, procurement decisions are frequently guided by long-term clinical results, with the goal of ensuring at least standard quality of HRMDs. But in countries like Mexico, decision-making is often dominated by lowest acquisition price. We set out to study the impact of procurement for orthopaedic HRMDs on clinical procedures and outcomes. We based our qualitative study on 59 in-depth interviews with stakeholders from Mexico, Switzerland, Germany, and UK: orthopaedic specialists, government officials, other experts, and social security system managers or administrators. We took a healthcare delivery approach to capturing and comparing factors that affected the regulations of HRMDs and procurement processes, and to understanding connections between procurement and clinical practice. Our findings demonstrate for procurement processes that the three European countries compared to Mexico don't have similar concerns with regards to their procurement processes. Deficiencies of procurement regulations and practices identified from representatives in Mexico were almost absent in European countries. We identified three areas of deficiency: 1) HRMD regulations based on insufficiently robust clinical evidence (mainly noted by European countries); 2) Follow-up on Health Technology Assessments is inadequate (noted by Mexico) and methodology not always good enough (noted by European countries); and, 3) Lowest-acquisition price often guides procurement decisions and thus may not align with needs of clinical procedures (noted by Mexico and some European countries). Procurement processes for orthopaedic HRMDs may have an impact on clinical procedures and outcomes. A favourable approach is one where orthopaedic specialists are parties to the procurement process, and post-market surveillance data informs decision-making. Actors in the procurement process can improve their impact on clinical procedures and outcomes by developing specific strategies that better align the needs of both, procurement and clinical procedures.
Toward a Framework for Dynamic Service Binding in E-Procurement
NASA Astrophysics Data System (ADS)
Ashoori, Maryam; Eze, Benjamin; Benyoucef, Morad; Peyton, Liam
In an online environment, an E-Procurement process should be able to react and adapt in near real-time to changes in suppliers, requirements, and regulations. WS-BPEL is an emerging standard for process automation, but is oriented towards design-time binding of services. This missing issue can be resolved through designing an extension to WS-BPEL to support automation of flexible e-Procurement processes. Our proposed framework will support dynamic acquisition of procurement services from different suppliers dealing with changing procurement requirements. The proposed framework is illustrated by applying it to health care where different health insurance providers could be involved to procure the medication for patients.
Potential fraudulent behaviors in e-procurement implementation in Indonesia
NASA Astrophysics Data System (ADS)
Huda, S. N.; Setiani, N.; Pulungan, R.; Winarko, E.
2017-03-01
Corruptions in public procurement have occurred in various parts of the world, especially in developing countries. Implementation of SPSE (electronic procurement system) as the e-procurement system in Indonesia is based on the government’s intentions towards clean and good governance by fighting corruption, collusion, and nepotism. Procurement in Indonesia is carried out through SPSE, which is developed by LKPP (Government Policy on Procurement of Goods/Services). Although this system has brought many positive effects, there are still found many practices of fraud occurring in the implementation of the system. In this paper, we try to identify these practices and then to systematically categorize and analyze them.
Terzaghi, Clara; Longo, Alessia; Legnani, Claudio; Bernasconi, Davide Paolo; Faré, Maristella
2015-03-01
The aim of this study was to analyze factors contributing to bacteriological contamination of bone and tendon allograft. Between 2008 and 2011, 2,778 bone and tendon allografts obtained from 196 organ and tissue donors or tissue donors only were retrospectively analysed. Several variables were taken into account: donor type (organ and tissue donors vs. tissue donor), cause of death, time interval between death and tissue procurement, duration of the procurement procedure, type of allografts, number of team members, number of trainees members, associated surgical procedures, positivity to haemoculture, type of procurement. The overall incidence of graft contamination was 23 %. The cause of death, the procurement time, the duration of procurement, the associated surgical procedures were not associated with increased risk of contamination. Significant effect on contamination incidence was observed for the number of staff members performing the procurement. In addition, our study substantiated significantly higher contamination rate among bone allografts than from tendon grafts. According to these observations, in order to minimize the contamination rate of procured musculoskeletal allografts, we recommend appropriate donor selection, use of standard sterile techniques, immediate packaging of each allograft to reduce graft exposure. Allograft procurement should be performed by a small surgical team.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-19
... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-23
... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...
41 CFR 101-26.501-5 - Procurement time schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedules. 101-26.501-5 Section 101-26.501-5 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...
77 FR 65500 - Extension of Suspension and Debarment Exclusions, Grants and Cooperative Agreements
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-29
... Government procurement. William P. McNally, Assistant Administrator for Procurement. Accordingly, 2 CFR Part... proposes to extend coverage of nonprocurement suspension and debarment to all-tier procurement and non-procurement actions under all grants and cooperative agreements. DATES: Interested parties should submit...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... DEPARTMENT OF AGRICULTURE 48 CFR Part 422 RIN 0599-AA19 Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law Violations AGENCY: Office of Procurement and Property Management, Department of Agriculture. ACTION: Proposed rule. SUMMARY: The Office of Procurement...
78 FR 70022 - Procurement List; Proposed Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-22
.... ACTION: Proposed Additions to and Deletions from the Procurement List. SUMMARY: The Committee is proposing to add products and a service to the Procurement List that will be furnished by nonprofit agencies... the Procurement List for production by the nonprofit agencies listed: Products Kit, Paint...
77 FR 60969 - Procurement List; Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
... Procurement List. Notice Correction: On 9/28/2012 (77 FR 59595), the Committee for Purchase From People Who Are Blind or Severely Disabled published a notice for additions to the Procurement List with the... and services to the Procurement List that will be furnished by nonprofit agencies employing persons...
75 FR 1355 - Procurement List Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-11
...: Additions to and deletions from Procurement List. SUMMARY: This action adds to the Procurement List services... disabilities, and deletes from the Procurement List products and services previously furnished by such agencies... [email protected] . SUPPLEMENTARY INFORMATION: Additions On 11/6/2009 (74 FR 57453-57454), the...
76 FR 78248 - Procurement List; Addition and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
.... Service Type/Location: Laundry Service, Stratton Medical Center, 113 Holland Ave, Albany, NY. [[Page 78249...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...
24 CFR 84.84 - Procurement standards.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Procurement standards. 84.84... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Use of Lump Sum Grants § 84.84 Procurement standards. (a) Purpose of procurement standards. Paragraphs (b) through (i) of this section set forth...
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may use alternate construction procurement methods to the traditional design/bid/build procedures... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Allowable methods of procurement...
7 CFR 235.9 - Procurement and property management standards.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Federal authority that has proper jurisdiction. (c) Procurement procedure. The State agency may use its... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management standards. 235.9... Procurement and property management standards. (a) Requirements. State agencies shall comply with the...
7 CFR 3565.257 - Procurement actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...
7 CFR 3565.257 - Procurement actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...
41 CFR 101-26.507-2 - Procurement time schedule.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedule. 101-26.507-2 Section 101-26.507-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-28
... Agreement. The Republic of Korea is already party to the World Trade Organization Government Procurement...) Agreement on Government Procurement (GPA). Although the rule now opens up Government procurement to the... 48 CFR Parts 225 and 252 Government procurement. Kortnee Stewart, Editor, Defense Acquisition...
10 CFR 1021.216 - Procurement, financial assistance, and joint ventures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... a decision on proposals and will include: (1) A brief discussion of the purpose of the procurement... 10 Energy 4 2010-01-01 2010-01-01 false Procurement, financial assistance, and joint ventures... POLICY ACT IMPLEMENTING PROCEDURES DOE Decisionmaking § 1021.216 Procurement, financial assistance, and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 2 2010-10-01 2010-10-01 false Payment of independent organ procurement... SKILLED NURSING FACILITIES Payment for End-Stage Renal Disease (ESRD) Services and Organ Procurement Costs § 413.200 Payment of independent organ procurement organizations and histocompatibility laboratories. (a...
7 CFR 225.17 - Procurement standards.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) Procurements by public sponsors comply with applicable State or local laws and the standards set forth in 7 CFR part 3016; and (2) Procurements by private nonprofit sponsors comply with standards set forth in 7 CFR... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement standards. 225.17 Section 225.17...
77 FR 37659 - Procurement List; Proposed Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
... additions to the procurement list. SUMMARY: The Committee is proposing to add products and services to the...- 598-5067 and 1670-01-598-5071 to its Procurement List. The Coverage statement associated with this... connection with the products and services proposed for addition to the Procurement List. Comments on this...
32 CFR 37.1330 - Procurement contract.
Code of Federal Regulations, 2010 CFR
2010-07-01
... REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in This Part § 37.1330 Procurement contract. A Federal Government procurement contract. It is a legal instrument which, consistent with 31 U.S... 32 National Defense 1 2010-07-01 2010-07-01 false Procurement contract. 37.1330 Section 37.1330...
10 CFR 603.1300 - Procurement contract.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Used in this Part § 603.1300 Procurement contract. A Federal Government procurement contract. It is a... 10 Energy 4 2010-01-01 2010-01-01 false Procurement contract. 603.1300 Section 603.1300 Energy... Government and a State, a local government, or other non-government entity when the principal purpose of the...
31 CFR 19.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Are any procurement contracts....220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2...
29 CFR 98.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 1 2011-07-01 2011-07-01 false Are any procurement contracts included as covered... SUSPENSION (NONPROCUREMENT) Covered Transactions § 98.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded...
29 CFR 98.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 1 2010-07-01 2010-07-01 true Are any procurement contracts included as covered... SUSPENSION (NONPROCUREMENT) Covered Transactions § 98.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded...
29 CFR 1471.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 4 2011-07-01 2011-07-01 false Are any procurement contracts included as covered... Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do...
29 CFR 1471.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 4 2010-07-01 2010-07-01 false Are any procurement contracts included as covered... Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do...
48 CFR 2406.304-70 - Approval of the justification-field procurements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Other Than Full and Open Competition 2406.304-70 Approval of the justification—field procurements. (a) The justification for other than full and open competition for field procurements shall be approved in... justification-field procurements. 2406.304-70 Section 2406.304-70 Federal Acquisition Regulations System...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Procurement. 627.420 Section 627.420... PROGRAMS UNDER TITLES I, II, AND III OF THE ACT Administrative Standards § 627.420 Procurement. (a) General. (1) For purposes of this section, the term procurement means the process which leads to any award of...
ERIC Educational Resources Information Center
Owusu-Manu, D.; Badu, E.; Edwards, D. J.
2011-01-01
Procurement in the corporate world is increasingly complex, multi-faceted and interdisciplinary. This paper explores existing knowledge specifications relating to procurement management competencies and proposes a new procurement management competency framework (PMCF) and a competency-based postgraduate programme for postgraduate students in…
Information Requirements for a Procurement Management Information System.
1975-08-01
Management Information System is...described and some justification for this type of procurement management information system is presented. A literature search was made to determine...information systems. If information requirements are correctly identified and satisfied by a procurement management information system , contract administration and procurement management can be
NRC assessment of improvements in licensee procurement and dedication programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grimes, B.K.; Potapovs, U.; Campbell, L.L.
1991-01-01
The US Nuclear Regulatory Commission (NRC) recently conducted a series of on-site assessments at selected nuclear plants to review improvements that the licenses had made to their procurement and dedication activities. The assessments included an evaluation of the progress made by licensees to strengthen their commercial-grade dedication programs to comply with 10CRF50, Appendix B, and to implement the comprehensive procurement improvements suggested in Nuclear Management and Resource Council (NUMARC) publication 901-3. This paper discusses the overall purpose of the assessments, procurement areas assessed, major strengths and weaknesses identified in licensee procurement programs, and the NRC's perspective of the industry's responsemore » to NUMARC procurement initiatives.« less
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
Greening Operations Management: An Online Sustainable Procurement Course for Practitioners
ERIC Educational Resources Information Center
Walker, Helen L.; Gough, Stephen; Bakker, Elmer F.; Knight, Louise A.; McBain, Darian
2009-01-01
In the Operations Management field, sustainable procurement has emerged as a way to green the purchasing and supply process. This paper explores issues in sustainable procurement training. The authors formed an interdisciplinary team to design, deliver and evaluate a training programme to promote and develop sustainable procurement in the United…
Code of Federal Regulations, 2010 CFR
2010-01-01
... unrestricted procurement for Certificate of Competency purposes? 121.409 Section 121.409 Business Credit and... an unrestricted procurement for Certificate of Competency purposes? For the purpose of receiving a Certificate of Competency in an unrestricted procurement, the applicable size standard is that corresponding...
The NGST Science Instrument Procurement Plan
NASA Astrophysics Data System (ADS)
Greenhouse, M. A.; NGST Project Office Team
1998-12-01
We display the top level plan for procurement of science instruments for NGST. The procurement process and time line schedule leading to a NASA AO solicitation for flight instruments is presented and discussed. This procurement schedule includes important milestones that will be reached during 1999 and that are of potential interest to NGST instrument offerors.
Code of Federal Regulations, 2014 CFR
2014-01-01
... justified); is for construction and seeks to package or consolidate discrete construction projects; or if a... alternatives may include: (A) Breaking up the procurement into smaller discrete procurements, especially construction acquisitions that can be procured as separate projects; (B) Breaking out one or more discrete...
22 CFR 208.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
22 CFR 208.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
22 CFR 1508.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
5 CFR 919.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Are any procurement contracts included as...) Covered Transactions § 919.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency...
A Blueprint for Effective and Adaptable School District Procurement
ERIC Educational Resources Information Center
Maas, Tricia; Lake, Robin
2015-01-01
In public education, procurement reform has been all but ignored in policy discussions and procurement policies have remained virtually untouched. But the high price of ignoring procurement is becoming clear to people trying to reform education on the ground. Often involving long, cumbersome processes and risk-averse central office cultures,…
eProcurement: The Technology of Smart Shopping
ERIC Educational Resources Information Center
Briggs, Linda L.
2006-01-01
This article talks about eProcurement and examines why school districts are so slow to make the transition. Despite the billions of dollars that flow from schools each year in procurement spending, most K-12 districts in the United States, especially smaller ones, persist in using paperbased procurement models in which supplies are identified in…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-13
... Guidance on Government-Wide Debarment and Suspension (Non-procurement) AGENCY: U.S. Agency for...-procurement), currently located in Part 208 of Title 22 of the Code of Federal Regulations (CFR), and [email protected] , fax (202) 567-4695 FOR FURTHER INFORMATION CONTACT: Melita E. Yearwood, Procurement Analyst...
48 CFR 217.172 - Multiyear contracts for supplies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of units to be procured through the contract; and (2) In the case of a contract for procurement of aircraft, the budget request includes full funding of procurement funds for production beyond advance procurement activities of aircraft units to be produced in the fiscal year covered by the budget. (d)(1) The...
NASA Astrophysics Data System (ADS)
Candra, S.; E Gunawan, F.
2017-01-01
In digital economy, government of Indonesia uses the internet to deliver services and to communicate with citizens and organizations. One of applications are e-Procurement and LPSE is a unit to hold the service system of e-Procurement. Procurement of goods and services electronically in addition will increase transparency and accountability, improve market access and healthy competition, as well as improving the efficiency of the procurement process. Based on the background and specific objectives to be achieved, then the research will be viewed from e-Marketplace participation, Trust and its impact on the performance of existing procurement within the institution. Methods of data analysis used in this research is by using analysis of Structural Equation Modelling (SEM) by using the program Partial Least Square (PLS) to examine the relationship between variables. The population used in this study is an enterprise as well as other clients using the system LPSE Bekasi District. There are three part in this study population, namely the provision of a company, customer, and supplier of LPSE users amounted to 60 users. From data analysis, there are one hypothesis that rejected. The implication of this study are implementation of e-procurement and e-marketplace participation giving impact to procurement performance.
Critical factors for sustainable food procurement in zoological collections.
Hanson, Jonathan H
2015-01-01
Food procurement can play an important role in sustainable food supply chain management by zoos, linking organizational operations to the biodiversity conservation and sustainability mission of zoological collections. This study therefore examines the critical factors that shape sustainable food procurement in zoo and aquariums. Using a web-based survey data was collected from 41 members of the British and Irish Association of Zoos and Aquariums (BIAZA). This included information on the sustainable food procurement practices of these institutions for both their human and animal food supply chains, as well as profile information and data on the factors contributing to and inhibiting sustainable procurement practices. Zoological collections operated by charities, and those with a certified sustainability standard, were found to have significantly higher levels of sustainable food procurement. Zoos and aquariums whose human food operations were not contracted to an external party were also found to have significantly higher levels of sustainable food procurement in their human food supply chain. The most important drivers of sustainable food procurement were cost savings, adequate financial support and improved product quality. The highest ranking barriers were higher costs, other issues taking priority and a lack of alternative suppliers. The results suggest that a number of critical factors shape sustainable food procurement in zoological collections in the British Isles. Financial factors, such as cost savings, were important considerations. The significance of mission-related factors, such as charity status, indicated that core values held by zoos and aquariums can also influence their food procurement practices. © 2015 Wiley Periodicals, Inc.
Ewen, Margaret; Al Sakit, Maisa; Saadeh, Rawan; Laing, Richard; Vialle-Valentin, Catherine; Seita, Akihiro; Bunders, Joske
2014-01-01
The United Nations Relief and Works Agency for Palestine Refugees in the Near East (UNRWA), the main primary healthcare provider for 4.9 million Palestinian refugees, spent USD18.3 million on essential medicines dispensed free-of-charge through clinics in five areas of operation ('fields'): Gaza, Jordan, Lebanon, Syria, and the West Bank (2010). Faced with budget contraints and an increasing demand for medicines to treat chronic conditions, the objective of our study was to assess UNRWA's medicine procurement prices to see if savings could be possible. In July 2011, data was collected from UNRWA headquarters in Jordan. Price analyses focused on the top 80 medicines by value, accounting for 93% of pharmaceutical expenditure from the General Fund, with comparisons to international, regional and national references. Prices were also compared for the few medicines procured both through UNRWA's central tender (centrally) and by the fields directly (locally). Central procurement prices did not differ markedly from reference prices: median ratios of UNRWA prices to Management Sciences for Health's International Drug Price Indicator Guide, Jordan's Joint Procurement Department, Gulf Cooperation Council, and IDA Foundation bulk packs were 0.99, 1.00, 0.98 and 1.12 respectively. Applying the lowest comparator price to five comparatively higher priced medicines would yield savings of USD1.4 million. Local procurements were generally less cost-effective than central tender procurement, with notable differences across fields and medicines. Overall, UNRWA's procurement prices were competitive despite the relatively small quantities procured. Regular monitoring of procurement prices and quantities is needed in order to make informed decisions. Our evaluation also underscores the heavy burden of antidiabetic medicines and antimicrobials on UNRWA procurement expenditure.
Shrestha, Mina; Moles, Rebekah; Ranjit, Eurek; Chaar, Betty
2018-01-01
Accessibility and affordability of evidence-based medicines are issues of global concern. For low-income countries like Nepal, it is crucial to have easy and reliable access to affordable, good-quality, evidence-based medicines, especially in the aftermath of natural or manmade disasters. Availability of affordable and evidence-based high quality medicines depends on the medicine procurement procedure, which makes it an important aspect of healthcare delivery. In this study, we aimed to investigate medicine procurement practices in hospital pharmacies of Nepal within the framework of International Pharmaceutical Federation [FIP] hospital pharmacy guidelines "the Basel Statements". We conducted semi-structured interviews with hospital pharmacists or procurement officers in hospital pharmacies of four major regions in Nepal to explore procurement practices. Data were collected until saturation of themes, analysed using the framework approach, and organised around the statements within the procurement theme of the Basel Statements. Interviews conducted with 53 participants revealed that the procurement guidelines of the Basel Statements were adopted to a certain extent in hospital pharmacies of Nepal. It was found that the majority of hospital pharmacies in Nepal reported using an expensive direct-procurement model for purchasing medicines. Most had no formulary and procured medicines solely based on doctors' prescriptions, which were heavily influenced by pharmaceutical companies' marketing strategies. Whilst most procured only registered medicines, a minority reported purchasing unregistered medicines through unauthorised supply-chains. And although the majority of hospital pharmacies had some contingency plans for managing medicine shortages, a few had none. Procurement guidelines of the Basel Statements were thus found to be partially adopted; however, there is room for improvement in current procurement practices in hospital pharmacies of Nepal. Adoption and regulation of national and international policies is recommended for enhancing medicine accessibility, as well as improving preparedness for health emergencies during natural disasters and health epidemics.
Ranjit, Eurek
2018-01-01
Background Accessibility and affordability of evidence-based medicines are issues of global concern. For low-income countries like Nepal, it is crucial to have easy and reliable access to affordable, good-quality, evidence-based medicines, especially in the aftermath of natural or manmade disasters. Availability of affordable and evidence-based high quality medicines depends on the medicine procurement procedure, which makes it an important aspect of healthcare delivery. In this study, we aimed to investigate medicine procurement practices in hospital pharmacies of Nepal within the framework of International Pharmaceutical Federation [FIP] hospital pharmacy guidelines “the Basel Statements”. Method We conducted semi-structured interviews with hospital pharmacists or procurement officers in hospital pharmacies of four major regions in Nepal to explore procurement practices. Data were collected until saturation of themes, analysed using the framework approach, and organised around the statements within the procurement theme of the Basel Statements. Results Interviews conducted with 53 participants revealed that the procurement guidelines of the Basel Statements were adopted to a certain extent in hospital pharmacies of Nepal. It was found that the majority of hospital pharmacies in Nepal reported using an expensive direct-procurement model for purchasing medicines. Most had no formulary and procured medicines solely based on doctors’ prescriptions, which were heavily influenced by pharmaceutical companies’ marketing strategies. Whilst most procured only registered medicines, a minority reported purchasing unregistered medicines through unauthorised supply-chains. And although the majority of hospital pharmacies had some contingency plans for managing medicine shortages, a few had none. Conclusions Procurement guidelines of the Basel Statements were thus found to be partially adopted; however, there is room for improvement in current procurement practices in hospital pharmacies of Nepal. Adoption and regulation of national and international policies is recommended for enhancing medicine accessibility, as well as improving preparedness for health emergencies during natural disasters and health epidemics. PMID:29401474
Code of Federal Regulations, 2010 CFR
2010-07-01
... MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement... contracts will not adequately serve the end-use purpose. GSA will notify the requesting agency in writing of... in which the requisitioner is located. GSA will either arrange for procurement of the items or...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-5 - Procurement of natural gas from the wellhead and other supply sources.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-26.602-5 Procurement of natural gas from the wellhead and other supply sources. (a) Natural gas... natural gas procurements at a facility exceed 20,000 mcf annually and the facility can accept... natural gas shall be forwarded to the Public Utilities Division (PPU), Office of Procurement, General...
ERIC Educational Resources Information Center
Federal Library Committee, Washington, DC.
The Federal Library Committee through the Task Force on Procurement Procedures in Federal Libraries is examining all problems and is recommending policies, procedures, and practices which will maximize the efficient procurement of library materials. It is suggested that the vehicle for this investigation be the appropriate Commission on Government…
Determinants of Non-Compliance of Public Procurement Regulations in Kenyan Secondary Schools
ERIC Educational Resources Information Center
Migosi, Joash; Ombuki, Charles; Ombuki, Kennedy N.; Evusa, Zablon
2013-01-01
Kenya's public procurement and disposal Act of 2005 sets out clear rules and procedures for public procurement entities to follow; however this does not seem to be the case. This study sought to examine determinants of Non-compliance to the Public Procurement Regulations in Kenyan Secondary Schools. The study adopted a descriptive survey research.…
41 CFR 101-26.602-5 - Procurement of natural gas from the wellhead and other supply sources.
Code of Federal Regulations, 2011 CFR
2011-07-01
...-26.602-5 Procurement of natural gas from the wellhead and other supply sources. (a) Natural gas... natural gas procurements at a facility exceed 20,000 mcf annually and the facility can accept... natural gas shall be forwarded to the Public Utilities Division (PPU), Office of Procurement, General...
1986-06-01
financial reporting in Republic of Korea Army (ROKA) procurement. A discussion of the nature of the ROKA procurement system and two alternatives to historical cost financial statements are presented. The concepts, methods and procedures of the historical cost/constant dollars financial statements are described. The proposal for current cost/constant dollars financial statements is presented and emphasis is given to the description of four problems in existing ROKA procurement due to using inadequate accounting information. Keywords: Cost accounting, Procurement, Current
BIM-Based E-Procurement: An Innovative Approach to Construction E-Procurement
2015-01-01
This paper presents an innovative approach to e-procurement in construction, which uses building information models (BIM) to support the construction procurement process. The result is an integrated and electronic instrument connected to a rich knowledge base capable of advanced operations and able to strengthen transaction relationships and collaboration throughout the supply chain. The BIM-based e-procurement prototype has been developed using distinct existing electronic solutions and an IFC server and was tested in a pilot case study, which supported further discussions of the results of the research. PMID:26090518
Wafula, Francis; Agweyu, Ambrose; Macintyre, Kate
2014-04-01
Nearly 40% of Global Fund money goes toward procurement. However, no analyses have been published to show how costs vary across regions and time, despite the availability of procurement data collected through the Global Fund's price and quality reporting system. We analyzed data for the 3 most widely procured commodities for the prevention, diagnosis, and treatment of HIV. These were male condoms, HIV rapid tests, and the antiretroviral (ARV) combination of lamivudine/nevirapine/zidovudine. The compared costs, first across time (2005-2012), then across regions, and finally, between individual procurement reported through the price and quality reporting and pooled procurement reported through the Global Fund's voluntary pooled procurement system. All costs were adjusted for inflation and reported in US dollars. There were 2337 entries from 578 grants in 125 countries. The procurement cost for the ARV dropped substantially over the period, whereas those for condoms and HIV tests remained relatively stable. None of the commodity prices increased. Regional variations were pronounced for HIV tests, but minimal for condoms and the ARV. The unit cost for the 3-table ARV combination, for instance, varied between US$0.15 and US$0.23 in South Asia and the Eastern Europe/Central Asia regions, respectively, compared with a range of $0.23 (South Asia)-$1.50 (Eastern Europe/Central Asia) for a single diagnostic test. Pooled procurement lowered costs for condoms but not the other commodities. We showed how global procurement costs vary by region and time. Such analyses should be done more often to identify and correct market insufficiencies.
The procurement of NHS dental services--a guide.
Jones, C L; Rooney, E
2009-05-23
This paper gives an overview of the strategic background for procurement of NHS primary care dental services and an outline of the processes involved in procurement. The main aim is to bring procurement to the attention of a wider audience of dental practitioners and provide advice for potential primary care dental service providers. The move towards local procurement of healthcare services, including primary care dental services, has been shaped by a number of strategic Government publications and is supported by law. In line with other public bodies, the NHS is subject to the European Union and international rules regarding procurement and awarding contracts. Primary Care Trust (PCT) Dental Service Commissioners have to ensure that their procurement strategy is transparent and non-discriminatory so that all providers have an equal opportunity to compete for contracts. In order to successfully tender for future service provision contracts, dental practitioners not only need to be aware of the process of procurement and its associated legal requirements. It is also important that they have a grasp of the expectations of PCTs. Commissioning services via procurement is set to become more commonplace and it is likely, in time, that competition for some contracts will increase in intensity. The importance of researching proposals thoroughly and adopting a professional, businesslike approach to tendering cannot be understated as this maximises chance of success in the new commissioning environment.
Berkeley Lab - Materials Sciences Division
MSD Support Human Resources Facilities & Space Planning Procurement and Property Proposals & Planning Procurement and Property Proposals & Finance Templates Travel Procurement and Property This
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
7 CFR 226.22 - Procurement standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... affirmative action in support of women's business enterprises. (g) All procurement transactions, regardless of... history of a procurement. These records shall include, but are not necessarily limited to information...
24 CFR 943.150 - What procurement standards apply to a PHA's joint venture partner?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false What procurement standards apply to... Subsidiaries, Affiliates, Joint Ventures in Public Housing § 943.150 What procurement standards apply to a PHA..., accordingly, is not required to comply with part 84 or part 85 of this title in its procurement of goods and...
NASA Astrophysics Data System (ADS)
Morel de Westgaver, Eric; van Beekhuizen, Pieter; Fiorilli, Stefano M.
2007-02-01
Space projects are marked by their high technologies and their lengthy development and operations. The procurement process is a critical element that must adapt to a changing industrial landscape and new methods and tools, such as electronic procurement. ESA will host an international symposium in May [2007] to bring all the major players together.
The model and moral justification for organ procurement in Japan.
Bagheri, Alireza; Shoji, Shin'ichi
2005-01-01
Organ replacement therapy is a part of medical practice in today's world and many countries have adopted the required guidelines and regulations. Establishing the basis on which organs can be removed, is still one of the most controversial issues of health policy making in the debate. The critical disparity between supply and demand in organ replacement therapy, even with the existence of social acceptance and organ transplantation law, turns attention towards the importance of an appropriate model of organ procurement. This model should be able to expand the donor pool and increase the organ retrieval rate by converting potential donors to actual ones. In Japan the organ transplantation law which was enacted in 1997 allows organ procurement from brain death as well as non-heart beating cadavers according to restricted conditions. One such condition includes the necessity of both the donor's and the family's written consent. Under current organ procurement policy, organs from only 29 brain death cases have been so far procured. In this paper after examining the current organ procurement system in Japan and the moral justifications behind different organ procurement models we conclude that the Japanese system does not clearly fall into one of the popular organ procurement models.
Cost effective nuclear commercial grade dedication
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maletz, J.J.; Marston, M.J.
1991-01-01
This paper describes a new computerized database method to create/edit/view specification technical data sheets (mini-specifications) for procurement of spare parts for nuclear facility maintenance and to develop information that could support possible future facility life extension efforts. This method may reduce cost when compared with current manual methods. The use of standardized technical data sheets (mini-specifications) for items of the same category improves efficiency. This method can be used for a variety of tasks, including: Nuclear safety-related procurement; Non-safety related procurement; Commercial grade item procurement/dedication; Evaluation of replacement items. This program will assist the nuclear facility in upgrading its procurementmore » activities consistent with the recent NUMARC Procurement Initiative. Proper utilization of the program will assist the user in assuring that the procured items are correct for the applications, provide data to assist in detecting fraudulent materials, minimize human error in withdrawing database information, improve data retrievability, improve traceability, and reduce long-term procurement costs.« less
22 CFR 201.22 - Procurement under public sector procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... procurement. Purchasing by brand or trade name or by a restrictive specification (proprietary procurement) may... by operating personnel, can be achieved through standardizing on a particular brand; (2...
Code of Federal Regulations, 2012 CFR
2012-04-01
.... (1) For purposes of this section, the term procurement means the process which leads to any award of... shall maintain records sufficient to detail the significant history of a procurement. These records...
41 CFR 101-26.501-3 - Consolidated purchase program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT..., purchased in the aggregate by group to the extent practical. These procurements are designed to obtain the...
13 CFR 125.15 - What requirements must an SDVO SBC meet to submit an offer on a contract?
Code of Federal Regulations, 2010 CFR
2010-01-01
... corresponding to the NAICS code assigned to the contract, provided: (A) For a procurement having a revenue-based... to the contract; or (B) For a procurement having an employee-based size standard, the procurement... specific contract: (1) It is an SDVO SBC; (2) It is small under the NAICS code assigned to the procurement...
17 CFR 200.13 - Executive Director.
Code of Federal Regulations, 2010 CFR
2010-04-01
... AND ETHICS; AND INFORMATION AND REQUESTS Organization and Program Management General Organization... procurement regulations, enters into contracts, designates contracting officers, and makes procurement...-specific application of performance measures, procurement reforms, personnel reductions, financial...
2014-01-01
Background Previous studies have described expenditures for antiretroviral (ARV) medicines in Brazil through 2005. While prior studies examined overall expenditures, they have not have analyzed drug procurement data in order to describe the role of court litigation on access and pricing. Methods ARV drug procurement from private sector sources for the years 2004–2011 was obtained through the general procurement database of the Brazilian Federal Government (SIASG). Procurement was measured in Defined Daily Doses (DDD) per 1000 persons-under-treatment per day. Expenditures and price per DDD were calculated and expressed in U.S. Dollars. Justifications for ARV purchases were examined in order to determine the relationship between health litigation and incorporation into Brazil’s national treatment guidelines. Results Drug procurement of ARVs from private sources underwent marked expansion in 2005, peaked in 2009, and stabilized to 2008 levels by 2011. Expenditures followed procurement curves. Medications which were procured for the first time after 2007 cost more than medicines which were introduced before 2007. Judicial actions initially resulted in purchases of newer medications for a select number of patients in Brazil but ultimately expanded availability to a larger population through incorporation into the national treatment guidelines. Conclusions Drug procurement and expenditures for ARVs in Brazil varied between 2004–2011. The procurement of some drugs from the private sector ceased after public manufacturers started producing them locally. Judicial demand has resulted in the incorporation of newer drugs into the national treatment guidelines. In order for the AIDS treatment program to remain sustainable, efforts should be pursued to reduce prices through generic drugs, price negotiation and other public health flexibilities such as compulsory licensing. PMID:24735589
Luo, Jing; Oliveira, Maria A; Ramos, Mariana B C; Maia, Aurélio; Osorio-de-Castro, Claudia G S
2014-04-16
Previous studies have described expenditures for antiretroviral (ARV) medicines in Brazil through 2005. While prior studies examined overall expenditures, they have not have analyzed drug procurement data in order to describe the role of court litigation on access and pricing. ARV drug procurement from private sector sources for the years 2004-2011 was obtained through the general procurement database of the Brazilian Federal Government (SIASG). Procurement was measured in Defined Daily Doses (DDD) per 1000 persons-under-treatment per day. Expenditures and price per DDD were calculated and expressed in U.S. Dollars. Justifications for ARV purchases were examined in order to determine the relationship between health litigation and incorporation into Brazil's national treatment guidelines. Drug procurement of ARVs from private sources underwent marked expansion in 2005, peaked in 2009, and stabilized to 2008 levels by 2011. Expenditures followed procurement curves. Medications which were procured for the first time after 2007 cost more than medicines which were introduced before 2007. Judicial actions initially resulted in purchases of newer medications for a select number of patients in Brazil but ultimately expanded availability to a larger population through incorporation into the national treatment guidelines. Drug procurement and expenditures for ARVs in Brazil varied between 2004-2011. The procurement of some drugs from the private sector ceased after public manufacturers started producing them locally. Judicial demand has resulted in the incorporation of newer drugs into the national treatment guidelines. In order for the AIDS treatment program to remain sustainable, efforts should be pursued to reduce prices through generic drugs, price negotiation and other public health flexibilities such as compulsory licensing.
Integrated Procurement Management System, Version II
NASA Technical Reports Server (NTRS)
Collier, L. J.
1985-01-01
Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zaeh, R.A.
1993-04-01
This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1992. Activities for both the New Mexico and California locations are included. Topics covered in this report include highlights for fiscal year 1992, personnel, procurements (small business procurements, disadvantaged business procurements, woman-owned business procurements, New Mexico commercial business procurements, Bay area commercial business procurements), commitments by states and foreign countries, and transportation activities. Also listed are the twenty-five commercial contractors receiving the largest dollar commitments, commercial contractors receiving commitments of $1,000 or more, integrated contractor and federal agency commitments of $1,000 ormore » more from Sandia National Laboratories/New Mexico and California, and transportation commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California.« less
Technology-neutral green procurement in practice - an example from Swedish waste management.
Arvidsson, Anders; Stage, Jesper
2012-05-01
Green public procurement has been criticized for its excessive reliance on detailed technology specifications, which can distort incentives in the short term and discourage innovation in the longer term. Economists therefore tend to prefer technology-neutral procurement, which rewards outcomes rather than technologies. However, technology-neutral procurement can also be problematic in practice. The present study investigated green public procurement of waste management, a rapidly growing field. In one of the most sophisticated models for technology-neutral procurement applied in Sweden in recent years, different environmental impacts were assigned weights, but no weight was given to the particular technology employed. Even here, however, potential inefficiencies were found where the scoring rule could have led to arbitrary, and presumably unwanted, outcomes. Explicitly assigning monetary surcharges to desirable and undesirable environmental effects may be a better way to reach environmental targets.
Lung Focused Resuscitation at a Specialized Donor Care Facility Improves Lung Procurement Rates.
Chang, Stephanie H; Kreisel, Daniel; Marklin, Gary F; Cook, Lindsey; Hachem, Ramsey; Kozower, Benjamin D; Balsara, Keki R; Bell, Jennifer M; Frederiksen, Christine; Meyers, Bryan F; Patterson, G Alexander; Puri, Varun
2018-05-01
Lung procurement for transplantation occurs in approximately 20% of brain dead donors and is a major impediment to wider application of lung transplantation. We investigated the effect of lung protective management at a specialized donor care facility on lung procurement rates from brain dead donors. Our local organ procurement organization instituted a protocol of lung protective management at a freestanding specialized donor care facility in 2008. Brain dead donors from 2001 to 2007 (early period) were compared with those from 2009 to 2016 (current period) for lung procurement rates and other solid-organ procurement rates using a prospectively maintained database. An overall increase occurred in the number of brain dead donors during the study period (early group, 791; late group, 1,333; p < 0.0001). The lung procurement rate (lung donors/all brain dead donors) improved markedly after the introduction of lung protective management (early group, 157 of 791 [19.8%]; current group, 452 of 1,333 [33.9%]; p < 0.0001). The overall organ procurement rate (total number of organs procured/donor) also increased during the study period (early group, 3.5 organs/donor; current group, 3.8 organs/donor; p = 0.006). Lung protective management in brain dead donors at a specialized donor care facility is associated with higher lung utilization rates compared with conventional management. This strategy does not adversely affect the utilization of other organs in a multiorgan donor. Copyright © 2018 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.
Singh, Prabal Vikram; Tatambhotla, Anand; Kalvakuntla, Rohini; Chokshi, Maulik
2013-01-01
Objective To perform an initial qualitative comparison of the different procurement models in India to frame questions for future research in this area; to capture the finer differences between the state models through 53 process and price parameters to determine their functional efficiencies. Design Qualitative analysis is performed for the study. Five states: Tamil Nadu, Kerala, Odisha, Punjab and Maharashtra were chosen to ensure heterogeneity in a number of factors such as procurement type (centralised, decentralised or mixed); autonomy of the procurement organisation; state of public health infrastructure; geography and availability of data through Right to Information Act (RTI). Data on procurement processes were collected through key informant analysis by way of semistructured interviews with leadership teams of procuring organisations. These process data were validated through interviews with field staff (stakeholders of district hospitals, taluk hospitals, community health centres and primary health centres) in each state. A total of 30 actors were interviewed in all five states. The data collected are analysed against 52 process and price parameters to determine the functional efficiency of the model. Results The analysis indicated that autonomous procurement organisations were more efficient in relation to payments to suppliers, had relatively lower drug procurement prices and managed their inventory more scientifically. Conclusions The authors highlight critical success factors that significantly influence the outcome of any procurement model. In a way, this study raises more questions and seeks the need for further research in this arena to aid policy makers. PMID:23388196
Medical technology procurement in Europe: a cross-country comparison of current practice and policy.
Sorenson, Corinna; Kanavos, Panos
2011-04-01
Procurement policy can influence the diffusion of medical devices into national health systems, but limited comparative evidence exists on how countries procure such technologies. This paper discusses the procurement of select medical devices across five countries (England, France, Germany, Italy, and Spain) based on a review of published and grey literature and policy documents, as well as expert interviews. All countries have introduced various regulatory or policy measures that implicitly or explicitly influence device procurement, from lists of devices for purchase to changes in financing mechanisms. There has also been movement toward more centralized procurement with the introduction of purchasing groups or consortiums, notably in England, France, Germany, and Italy. While a number of stakeholder groups are involved in purchasing activities, a greater, more formalized role for physicians and governments is needed to ensure that technologies procured best meet patient needs and align with national health care priorities and other sectoral objectives. A general theme across all national procurement systems was a focus on cost-containment, but like other areas of technology policy (e.g., coverage), basing purchasing decisions on a broader range of criteria, such as quality and health outcomes, might better allow governments to achieve value for money and support patient access to beneficial innovations. More research is needed, however, to substantiate the role and influence of procurement on balancing the adoption and affordability of medical technologies. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.
Singh, Prabal Vikram; Tatambhotla, Anand; Kalvakuntla, Rohini; Chokshi, Maulik
2013-01-01
To perform an initial qualitative comparison of the different procurement models in India to frame questions for future research in this area; to capture the finer differences between the state models through 53 process and price parameters to determine their functional efficiencies. Qualitative analysis is performed for the study. Five states: Tamil Nadu, Kerala, Odisha, Punjab and Maharashtra were chosen to ensure heterogeneity in a number of factors such as procurement type (centralised, decentralised or mixed); autonomy of the procurement organisation; state of public health infrastructure; geography and availability of data through Right to Information Act (RTI). Data on procurement processes were collected through key informant analysis by way of semistructured interviews with leadership teams of procuring organisations. These process data were validated through interviews with field staff (stakeholders of district hospitals, taluk hospitals, community health centres and primary health centres) in each state. A total of 30 actors were interviewed in all five states. The data collected are analysed against 52 process and price parameters to determine the functional efficiency of the model. The analysis indicated that autonomous procurement organisations were more efficient in relation to payments to suppliers, had relatively lower drug procurement prices and managed their inventory more scientifically. The authors highlight critical success factors that significantly influence the outcome of any procurement model. In a way, this study raises more questions and seeks the need for further research in this arena to aid policy makers.
2016-03-23
Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress Ronald O’Rourke Specialist...Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition Congressional Research Service Summary Multiyear procurement (MYP) and... block buy contracting (BBC) are special contracting mechanisms that Congress permits the Department of Defense (DOD) to use for a limited number of
Federal procurement metrication appropriateness and methods
NASA Astrophysics Data System (ADS)
Coella, M. A.
1982-09-01
This study was designed to provide the USMB with a clearer understanding of the basic relationships between the Federal procurement process and private sector suppliers. This was done to gain an understanding of the ways in which Federal procurement can encourage and accommodate initiatives of the private sector and to ensure that the effects of conversion on the Federal and private sectors are understood prior to implementation of procurement decisions and actions.
Recommendations of the Commission on Government Procurement: A Final Assessment
1979-05-31
Assessment TECHNICAi; LIBRARY Important structural changes are now in place on procurement reforms first proposed in 1972, but the program is far...COMPTROLLER GENERAL’S REPORT TO THE CONGRESS RECOMMENDATIONS OF THE COMMISSION ON GOVERNMENT PROCUREMENT: A FINAL ASSESSMENT DIGEST As Federal...legislation and —the Office of Federal Procurement Policy (OFPP) to lead in making needed changes. OVERALL ASSESSMENT Success of the reform program is still
2016-07-25
Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress Ronald O’Rourke Specialist...Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition Congressional Research Service Summary Multiyear procurement (MYP) and... block buy contracting (BBC) are special contracting mechanisms that Congress permits the Department of Defense (DOD) to use for a limited number of
GPP Webinar: Solar Procurement Templates and Tools for Higher Education
Green Power Partnership webinar on solar procurement for Higher Education which features various tools and templates that schools can use to shape and manage the solar procurement process to a successful outcome.
Pooling procurement in the Belgian hospital sector.
Hebert, Guy
2011-01-01
The Belgian hospital sector is following the example of a number of other European countries and for more than ten years now, has been striving to pool its medical supplies and equipment purchases in a bid to reduce costs. The various experiments of which we are aware come under both opportunist purchases and initiatives which are designed to encourage local-regional contracts. These attempts have now all come to nothing or are struggling in the absence of a structured and professional approach. In 2005, the Saint Luc University Clinic in Brussels decided to set up a high-performance purchasing department, the aim being to centre its initiatives around TCO or Total Cost of Ownership. Following an analysis of the various experiments into pooling procurement in hospitals in Europe, the Saint Luc University Clinic decided on a central procurement agency model, in accordance with new legislation on public procurement. This article seeks to highlight the prerequisites which are vital for a procurement pooling initiative, without underestimating the risks and limitations of implementing such a change in procurement practices. The Mercure central procurement agency is now the largest interhospital purchasing structure in Belgium.
NASA Technical Reports Server (NTRS)
Rao, Gopalakrishna M.; Vaidyanathan, Hari
2007-01-01
This viewgraph presentation reviews the use of the binding procurement process in purchasing Aerospace Flight Battery Systems. NASA Engineering and Safety Center (NESC) requested NASA Aerospace Flight Battery Systems Working Group to develop a set of guideline requirements document for Binding Procurement Contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... guidelines for procurement to the overseas Missions. Administrative and local support services include the... uniform procurement policies, procedures, and standards; (2) Providing assistance to the contracting activities as appropriate; (3) Keeping the Administrator and Executive Staff fully informed on procurement...
Portable device technology in organ donation: new "app" for procurement coordinators.
Cavallin, M; Bertini, P; Lopane, P; Guarracino, F
2014-09-01
Portable devices are commonly used at bedside in everyday practice. Transplant procurement coordinators routinely have to deal with protocols and flow charts and need to assess the donor condition several times. In our experience, a great part of the organ procurement management work is provided by nurses "on call." We developed an application for iOS devices to facilitate their approach to relatives and procedures for organ donation. The application, which includes algorithms, tutorials, and simple calculators, has been designed by transplant procurement coordinators to speed up the process of organ donation and at the same time to be as accurate as possible for the process. It can be used alongside all of the procedures for procurement in the emergency room, intensive care unit, operating room, and morgue in both brainstem-dead and cadaver organ donors. The application could be effective in organ procurement management for everyday practice. Copyright © 2014 Elsevier Inc. All rights reserved.
Sequential improvements in organ procurement increase the organ donation rate.
Billeter, Adrian T; Sklare, Seth; Franklin, Glen A; Wright, Jerry; Morgan, Gary; O'Flynn, Paul E; Polk, Hiram C
2012-11-01
Organ demand exceeds availability of transplantable organs. Organ procurement continues to suffer from failures to identify potential donors, inability to obtain consent for donation, as well as failures to retrieve certain organs as donor demographics change. The purpose of this article is to propose how sequentially introduced measures can increase organ donation rates as well as improve organ procurement. We analysed the effect of stepwise improvements in the organ procurement process patients in a university-based surgical intensive care unit over a 20-year period. We related newly introduced measures in the organ retrieval process with changes in donation rates. We specifically targeted these three main steps in the donation process: donor identification, conversion of potential donors to actual donors, and organ protection during the procurement process. Finally, we assessed the effect of the same measures on organ procurement after introduction in other hospitals of the same organ procurement region. Introduction of quality improvement steps increased all of the observed parameters. The number of organ donors was stabilised due to a better identification of potential donors, a major increase in conversion from potential to actual donors, and an increase in extended criteria donor. Improvements in organ protection led to higher rates of organs transplanted per donor and increased recovery of lungs and hearts despite increasing donor age. The same measures were introduced successfully in other hospitals in our organ procurement region. Sequential improvements in organ procurement can increase the yield of retrieved organs. The same measures can be applied to other hospitals and lead to comparable improvements in organ donation. Published by Elsevier Ltd.
Scientific, legal, and ethical challenges of end-of-life organ procurement in emergency medicine.
Rady, Mohamed Y; Verheijde, Joseph L; McGregor, Joan L
2010-09-01
We review (1) scientific evidence questioning the validity of declaring death and procuring organs in heart-beating (i.e., neurological standard of death) and non-heart-beating (i.e., circulatory-respiratory standard of death) donation; (2) consequences of collaborative programs realigning hospital policies to maximize access of procurement coordinators to critically and terminally ill patients as potential donors on arrival in emergency departments; and (3) ethical and legal ramifications of current practices of organ procurement on patients and their families. Relevant publications in peer-reviewed journals and government websites. Scientific evidence undermines the biological criteria of death that underpin the definition of death in heart-beating (i.e., neurological standard) and non-heart-beating (i.e., circulatory-respiratory standard) donation. Philosophical reinterpretation of the neurological and circulatory-respiratory standards in the death statute, to avoid the appearance of organ procurement as an active life-ending intervention, lacks public and medical consensus. Collaborative programs bundle procurement coordinators together with hospital staff for a team-huddle and implement a quality improvement tool for a Rapid Assessment of Hospital Procurement Barriers in Donation. Procurement coordinators have access to critically ill patients during the course of medical treatment with no donation consent and with family or surrogates unaware of their roles. How these programs affect the medical care of these patients has not been studied. Policies enforcing end-of-life organ procurement can have unintended consequences: (1) erosion of care in the patient's best interests, (2) lack of transparency, and (3) ethical and legal ramifications of flawed standards of declaring death. Copyright 2010 Elsevier Ireland Ltd. All rights reserved.
22 CFR 226.44 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.44 Procurement procedures. (a... and assistance, as appropriate, of such organizations as the Small Business Administration and the...
48 CFR 1323.204 - Procurement exemptions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 1323.204 Procurement exemptions. The designee authorized to exempt the procurement of an ENERGY STAR or Federal Energy Management...
48 CFR 1323.204 - Procurement exemptions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 1323.204 Procurement exemptions. The designee authorized to exempt the procurement of an ENERGY STAR or Federal Energy Management...
48 CFR 1323.204 - Procurement exemptions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 1323.204 Procurement exemptions. The designee authorized to exempt the procurement of an ENERGY STAR or Federal Energy Management...
48 CFR 1323.204 - Procurement exemptions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 1323.204 Procurement exemptions. The designee authorized to exempt the procurement of an ENERGY STAR or Federal Energy Management...
48 CFR 1323.204 - Procurement exemptions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 1323.204 Procurement exemptions. The designee authorized to exempt the procurement of an ENERGY STAR or Federal Energy Management...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-15
... DEPARTMENT OF AGRICULTURE Forest Service Information Collection; Virtual Incident Procurement... from all interested individuals and organizations on the new information collection, Virtual Incident....t., Monday through Friday. SUPPLEMENTARY INFORMATION: Title: Virtual Incident Procurement (VIPR...
Incardona, Sandra; Serra-Casas, Elisa; Champouillon, Nora; Nsanzabana, Christian; Cunningham, Jane; González, Iveth J
2017-05-15
Malaria rapid diagnostic tests (RDTs) play a critical role in malaria case management, and assurance of quality is a key factor to promote good adherence to test results. Since 2007, the World Health Organization (WHO) and the Foundation for Innovative New Diagnostics (FIND) have coordinated a Malaria RDT Evaluation Programme, comprising a pre-purchase performance evaluation (product testing, PT) and a pre-distribution quality control of lots (lot testing, LT), the former being the basis of WHO recommendations for RDT procurement. Comprehensive information on malaria RDTs sold worldwide based on manufacturers' data and linked to independent performance data is currently not available, and detailed knowledge of procurement practices remains limited. The use of the PT/LT Programme results as well as procurement and lot verification practices were assessed through a large-scale survey, gathering product-specific RDT sales and procurement data (2011-14 period) from a total of 32 manufacturers, 12 procurers and 68 National Malaria Control Programmes (NMCPs). Manufacturers' reports showed that RDT sales had more than doubled over the four years, and confirmed a trend towards increased compliance with the WHO procurement criteria (from 83% in 2011 to 93% in 2014). Country-level reports indicated that 74% of NMCPs procured only 'WHO-compliant' RDT products, although procurers' transactions datasets revealed a surprisingly frequent overlap of different products and even product types (e.g., Plasmodium falciparum-only and Plasmodium-pan) in the same year and country (60 and 46% of countries, respectively). Importantly, the proportion of 'non-complying' (i.e., PT low scored or not evaluated) products was found to be higher in the private health care sector than in the public sector (32% vs 5%), and increasing over time (from 22% of private sector sales in 2011 to 39% in 2014). An estimated 70% of the RDT market was covered by the LT programme. The opinion about the PT/LT Programmes was positive overall, and quality of RDTs as per the PT Programme was rated as the number one procurement criteria. This survey provided in-depth information on RDT sales and procurement dynamics, including the largely unstudied private sector, and demonstrated how the WHO-FIND Programme has positively influenced procurement practices in the public sector.
NASA Astrophysics Data System (ADS)
Wahid, Fathul
This study aims to examine factors affecting adoption of e-procurement in public sector with special reference to Indonesian context. The Perceived Characteristics of Innovating defined by Moore and Benbasat [1] used as the framework. Based on a survey to 87 contractors/suppliers in the city of Yogyakarta, the study finds that only trialability that affects use intention of e-procurement among the contractors/suppliers. The survey conducted in the early stage of e-procurement implementation is of the possible explanations. Government policy that forces the contractors/suppliers to use the e-procurement also partakes in this context. Practical implication of the findings are also discussed in the paper.
Thrailkill, Eric A.; Bouton, Mark E.
2015-01-01
Operant behavior is typically organized into sequences of responses that eventually lead to a reinforcer. Response elements can be categorized as those that directly lead to reward consumption (i.e., a consumption response), and those that lead to the opportunity to make the consumption response (i.e., a procurement response). These responses often differ topographically and in terms of the discriminative stimuli that set the occasion for them. We have recently shown that extinction of the procurement response acts to weaken the specific associated consumption response, and that active inhibition of the procurement response is required for this effect. To expand the analysis of the associative structure of chains, the present experiments asked the reverse question of whether extinction of consumption behavior results in a decrease in the associated procurement response in a discriminated heterogeneous chain. In Experiment 1, extinction of consumption alone led to an attenuation of the associated procurement response only when rats were allowed to make the consumption response in extinction. Exposure to the consumption stimulus alone was not sufficient to produce weakened procurement responding. In Experiment 2, rats learned two distinct heterogeneous chains; extinction of one consumption response specifically weakened the procurement response associated with it. The results add to evidence suggesting that rats learn a highly specific associative structure in behavior chains, and emphasize the role of learning response inhibition in extinction. PMID:26276367
Thrailkill, Eric A; Bouton, Mark E
2016-03-01
Operant behavior is typically organized into sequences of responses that eventually lead to a reinforcer. Response elements can be categorized as those that directly lead to reward consumption (i.e., a consumption response) and those that lead to the opportunity to make the consumption response (i.e., a procurement response). These responses often differ topographically and in terms of the discriminative stimuli that set the occasion for them. We have recently shown that extinction of the procurement response acts to weaken the specific associated consumption response, and that active inhibition of the procurement response is required for this effect. To expand the analysis of the associative structure of chains, in the present experiments we asked the reverse question: whether extinction of consumption behavior results in a decrease in the associated procurement response in a discriminated heterogeneous chain. In Experiment 1, extinction of consumption alone led to an attenuation of the associated procurement response only when rats were allowed to make the consumption response in extinction. Exposure to the consumption stimulus alone was not sufficient to produce weakened procurement responding. In Experiment 2, rats learned two distinct heterogeneous chains, and extinction of one consumption response specifically weakened the procurement response associated with it. The results add to the evidence suggesting that rats learn a highly specific associative structure in behavior chains, emphasizing the role of learning response inhibition in extinction.
Prevalence and correlates of hospital-based autologous blood programs: a statewide survey.
Hull, A L; Neuhauser, D V; Goodnough, L T
1992-05-01
To identify potential barriers to use of autologous blood procurement to minimize homologous blood transfusion needs during elective surgery, the authors conducted a telephone survey of 120 blood bank directors, representing 138 Ohio hospitals. The prevalence of autologous blood procurement facilities, estimated volume of autologous blood, and attitudes and perceptions of the directors toward autologous blood predeposit programs were assessed. Analysis of the data indicated that 30% of Ohio hospitals have autologous blood procurement facilities; larger hospitals were more likely to have this facility. Overall, 5.5% of transfusions involve predeposited autologous blood. No significant differences were found according to hospital bed size or whether the hospital had a procurement facility. Blood bank directors perceived surgeons to be knowledgeable about autologous predeposit; patient demand and surgical practice were felt to be more effective in promoting the use of autologous blood at the hospital than were blood bank efforts. Directors who had autologous predeposit procurement facilities perceived that the facility provided a marketing advantage. Respondents from larger hospitals were more likely to perceive that these programs could be financially self-sufficient. The authors conclude that an economic cost-benefit analysis of hospital-based autologous blood procurement programs is important. Positive findings may influence transfusion services to adopt autologous blood procurement programs, whereas negative findings may convince hospitals that community blood donor facilities can provide better autologous blood procurement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Head of the Agency for all purposes described in the Federal Acquisition Regulation (FAR, 48 CFR... procurement related aspects of the Foreign Assistance Act, Executive Order 11223, the Office of Federal Procurement Policy Act, and other statutory and Executive Branch procurement policies and requirements...
Code of Federal Regulations, 2011 CFR
2011-10-01
... management and administration—(1) Assisted acquisitions. (i) Prior to the issuance of a solicitation, the...) Determination of best procurement approach—(1) Assisted acquisitions. Prior to requesting that another agency... interagency acquisition represents the best procurement approach. As part of the best procurement approach...
76 FR 39234 - Federal Acquisition Regulation; Unique Procurement Instrument Identifier
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-05
...-AL70 Federal Acquisition Regulation; Unique Procurement Instrument Identifier AGENCIES: Department of... Acquisition Regulation (FAR) to standardize use of unique Procurement Instrument Identifiers (PIID) throughout... Acquisition Council and the Defense Acquisition Regulations Council (the Councils) reviewed the public...
78 FR 20620 - Procurement List; Additions to and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions to and Deletions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to and Deletions from the Procurement List. [[Page 20621
7 CFR 220.16 - Procurement standards.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM § 220.16 Procurement standards. (a) General... and Budget Circulars, concerning the procurement of all goods and services with nonprofit school food...
7 CFR 220.16 - Procurement standards.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM § 220.16 Procurement standards. (a) General... and Budget Circulars, concerning the procurement of all goods and services with nonprofit school food...
7 CFR 220.16 - Procurement standards.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM § 220.16 Procurement standards. (a) General... and Budget Circulars, concerning the procurement of all goods and services with nonprofit school food...
7 CFR 220.16 - Procurement standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM § 220.16 Procurement standards. (a) General... and Budget Circulars, concerning the procurement of all goods and services with nonprofit school food...
40 CFR 247.6 - Affirmative procurement programs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Affirmative procurement programs. 247.6 Section 247.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS General § 247.6 Affirmative...
Tang, Yuqing; Liu, Chaojie; Zhang, Xinping
2017-02-01
The low availability of essential medicines is a worldwide issue of concern. In 2009, China introduced a National Essential Medicines List (NEML), with NEML medicines being purchased in bulk at contracted prices established by tenders conducted at the provincial level. The availability of essential medicines in the public sector largely relies on commercial supply chains. The objectives of this paper were to analyze the delivery performance of essential medicines under NEML provincial procurement arrangements, and to determine whether the procurement volume and price of medicines are associated with the delivery performance of suppliers. We reviewed 9390 recorded orders of 1099 essential medicines in Hubei province from August 2011 to April 2012. The reliability of medicine delivery in-full and on-time (DIFOT) was considered the performance indicator, and we used Spearman correlation analyses to explore whether there were any associations between DIFOT and procurement price and volume. Quantile regressions were performed to determine such associations. The DIFOT had positive correlations with procurement price and volume. The Spearman rank correlation coefficients between price and DIFOT were 0.114, 0.34 and 0.25 for medicines with low one-third, middle one-third and high one-third procurement volumes, respectively. The quantile regression analysis revealed a positive association between price and DIFOT across all quantiles of DIFOT, and although significant positive associations between volume and DIFOT were only found at the 25th percentile of DIFOT, volume showed significant interactions with price for both the 25th and 50th percentiles of DIFOT. Higher procurement price is associated with better delivery performance of essential medicines; however, it is important to link procurement price with procurement volume. Increasing procurement volume may alleviate the negative effect of low price on delivery performance. Variation in volumes of repeated orders imposes uncertainties and may jeopardize the delivery of essential medicines.
38 CFR 41.305 - Auditor selection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Auditor selection. 41.305... OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS Auditees § 41.305 Auditor selection. (a) Auditor procurement. In procuring audit services, auditees shall follow the procurement standards...
41 CFR 101-26.501-2 - Standardized buying programs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.501-2 Standardized buying programs. Wherever... school age passenger. (4) Sedans and station wagons (based on standardized, consolidated requirements...
5 CFR 300.506 - Requirements of procurement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Requirements of procurement. 300.506 Section 300.506 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EMPLOYMENT (GENERAL) Use of Private Sector Temporaries § 300.506 Requirements of procurement. (a) Agencies...
An Analysis of Bid Evaluation Procedures of Contemporary Models for Procurement in Pakistan
2016-12-01
21 E. COMPONENTS FOR BID EVALUATION .........................................21 1. Market Intelligence...PROCUREMENT SYSTEM ...............................................23 1. Basic Principles ...43 1. Principles of Procurement and Prequalification .......................43 2. Contract Types
76 FR 13297 - Defense Federal Acquisition Regulation Supplement; Technical Amendments
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-11
... 215 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations System... Director, Defense Procurement and Acquisition Policy. DATES: Effective Date: March 11, 2011. Applicability... adding a section at 215.300 with a reference to Director, Defense Procurement and Acquisition Policy...
41 CFR 101-26.301 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Section 101-26.301 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301 Applicability. All executive agencies within the United States...
48 CFR 404.602 - Federal Procurement Data System.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Federal Procurement Data System. 404.602 Section 404.602 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE MATTERS Contract Reporting 404.602 Federal Procurement Data System. (a) Contracting activities...
48 CFR 309.404 - List of parties excluded from Federal procurement and non-procurement programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-procurement programs. (c) The ASFR/OGAPA/DA shall perform the actions required by FAR 9.404(c). (4) The ASFR/OGAPA/DA shall maintain all documentation the initiating official submits to recommend the debarment or...
78 FR 21348 - Procurement List; Additions and Deletions; Recissions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-10
... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions and Deletions; Recissions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Rescission of Previous Procurement List Decision. SUMMARY: The Committee for Purchase...
1988-05-23
Unclass) 12. PERSONAL AUTHOR(S) % Priest, Jolene J., McIllece, Raymond P. I 13a. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF REPORT (Year, Month...and identify by block number) FIELD GROUP SUB-GROUP Procurement (u), Procurement Work Directive (PWD) (u), Administrative Lead Time (ALT) (u...Procurement Administra-( A A o e e e time Lead Time (PALf) (u) "p 19. ABSTRACT (Continue on reverse if necessary and identify by block number) The practice of
Summary data on all NASA procurement actions
NASA Technical Reports Server (NTRS)
1990-01-01
Summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during the first six months on fiscal year 1990 are presented. Areas addressed include competition in NASA awards, awards to business firms, awards to educational and other nonprofit institutions, contract for operation of Jet Propulsion Laboratory, and awards through other government agencies. Other topics covered are the U.S. geographical distribution of awards, awards placed outside the U.S., and procurement activity by installation.
Advance Planning Briefing for Industry: Information Dominance for the Full Spectrum Force.
1997-05-29
Electronic Order Processing is projected. The procurement will be a FFP ID/IQ award. BRIEFER: LTC Mary Fuller, Product Manager, Army Small Computer Program...will be a Best Value evaluation with a minimum of 2 awards. The procurement is planned to run for 2 years for ordering, Electronic Order Processing is...procurement is planned to run for three years for ordering, Electronic Order Processing is projected. The procurement will be a FFP ID/IQ award. BRIEFER
Navy DDG-1000 Destroyer Program: Background, Oversight Issues, and Options for Congress
2007-10-25
production quantity of eight ships (one more than the Navy currently plans to procure). Shared Production Arrangement. NGSS and GD/BIW have agreed on a...X)). Navy plans call for procuring 7 DDG-1000s between FY2007 and FY2013. The first two DDG-1000s were procured in FY2007 and are being split...Congress for the DDG-1000 program include supporting the Navy’s proposed plans , using a block-buy arrangement for procuring several DDG-1000s, and
1976-11-01
Federal Procurement Policy Mr. Fred Bunke - Assistant Commissioner for Procurement, General Services Administration 5:00 - 6:00 p.m. No host cocktail party...Research Specialist General Services Administration -3- 71 Symposium Agenda 8:30 - 10:15 a.m. Concurrent Session II (cont’d.) WORKING GROUP E... Services Administration . From 1950 - 1960, Mr. Bunke held various supply and procurement billets at sea and ashore as a Navy Supply Corps Officer. From
Medical device procurement in low- and middle-income settings: protocol for a systematic review.
Diaconu, Karin; Chen, Yen-Fu; Manaseki-Holland, Semira; Cummins, Carole; Lilford, Richard
2014-10-21
Medical device procurement processes for low- and middle-income countries (LMICs) are a poorly understood and researched topic. To support LMIC policy formulation in this area, international public health organizations and research institutions issue a large body of predominantly grey literature including guidelines, manuals and recommendations. We propose to undertake a systematic review to identify and explore the medical device procurement methodologies suggested within this and further literature. Procurement facilitators and barriers will be identified, and methodologies for medical device prioritization under resource constraints will be discussed. Searches of both bibliographic and grey literature will be conducted to identify documents relating to the procurement of medical devices in LMICs. Data will be extracted according to protocol on a number of pre-specified issues and variables. First, data relating to the specific settings described within the literature will be noted. Second, information relating to medical device procurement methodologies will be extracted, including prioritization of procurement under resource constraints, the use of evidence (e.g. cost-effectiveness evaluations, burden of disease data) as well as stakeholders participating in procurement processes. Information relating to prioritization methodologies will be extracted in the form of quotes or keywords, and analysis will include qualitative meta-summary. Narrative synthesis will be employed to analyse data otherwise extracted. The PRISMA guidelines for reporting will be followed. The current review will identify recommended medical device procurement methodologies for LMICs. Prioritization methods for medical device acquisition will be explored. Relevant stakeholders, facilitators and barriers will be discussed. The review is aimed at both LMIC decision makers and the international research community and hopes to offer a first holistic conceptualization of this topic.
Loor, Gabriel; Shumway, Sara J; McCurry, Kenneth R; Keshavamurthy, Suresh; Hussain, Syed; Weide, Garry D; Spratt, John R; Al Salihi, Mazin; Koch, Colleen G
2016-12-01
Donor organs are often procured by junior staff in stressful, unfamiliar environments where a single adverse event can be catastrophic. A formalized checklist focused on preprocedural processes related to thoracic donor organ procurement could improve detection and prevention of near miss events. A checklist was developed centered on patient identifiers, organ compatibility and quality, and team readiness. It went through five cycles of feedback and revision using a panel of expert procurement surgeons. Educational in-service sessions were held on the use of the checklist as well as best organ assessment practices. Near miss events before the survey were tallied by retrospective review of 20 procurements, and near misses after checklist implementation were prospectively recorded. We implemented the checklist for 40 donor lung and heart procurements: 20 from Cleveland Clinic and 20 from the University of Minnesota. A final survey assessment was used to determine ease of use. Nine near miss events were reported in 20 procurements before use of the checklist. Thirty-one near miss events of 40 organ procurements were identified and potentially prevented by the checklist. Eighty-seven percent of fellows found the checklist to be unobtrusive to work flow, and 100% believed its use should be mandatory. Mortality was the same before and after implementation of the checklist despite increased patient volumes. Implementation of a simple checklist for use during thoracic organ procurement uncovered a substantial number of near miss events. A preprocedural checklist for all thoracic organ transplants in the United States and abroad is feasible and would likely reduce adverse events. Copyright © 2016 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.
Factors influencing global antiretroviral procurement prices.
Wirtz, Veronika J; Forsythe, Steven; Valencia-Mendoza, Atanacio; Bautista-Arredondo, Sergio
2009-11-18
Antiretroviral medicines (ARVs) are one of the most costly parts of HIV/AIDS treatment. Many countries are struggling to provide universal access to ARVs for all people living with HIV and AIDS. Although substantial price reductions of ARVs have occurred, especially between 2002 and 2008, achieving sustainable access for the next several decades remains a major challenge for most low- and middle-income countries. The objectives of the present study were twofold: first, to analyze global ARV prices between 2005 and 2008 and associated factors, particularly procurement methods and key donor policies on ARV procurement efficiency; second, to discuss the options of procurement processes and policies that should be considered when implementing or reforming access to ARV programs. An ARV-medicines price-analysis was carried out using the Global Price Reporting Mechanism from the World Health Organization. For a selection of 12 ARVs, global median prices and price variation were calculated. Linear regression models for each ARV were used to identify factors that were associated with lower procurement prices. Logistic regression models were used to identify the characteristics of those countries which procure below the highest and lowest direct manufactured costs. Three key factors appear to have an influence on a country's ARV prices: (a) whether the product is generic or not; (b) the socioeconomic status of the country; (c) whether the country is a member of the Clinton HIV/AIDS Initiative. Factors which did not influence procurement below the highest direct manufactured costs were HIV prevalence, procurement volume, whether the country belongs to the least developed countries or a focus country of the United States President's Emergency Plan For AIDS Relief. One of the principal mechanisms that can help to lower prices for ARV over the next several decades is increasing procurement efficiency. Benchmarking prices could be one useful tool to achieve this.
Medical device procurement in low- and middle-income settings: protocol for a systematic review
2014-01-01
Background Medical device procurement processes for low- and middle-income countries (LMICs) are a poorly understood and researched topic. To support LMIC policy formulation in this area, international public health organizations and research institutions issue a large body of predominantly grey literature including guidelines, manuals and recommendations. We propose to undertake a systematic review to identify and explore the medical device procurement methodologies suggested within this and further literature. Procurement facilitators and barriers will be identified, and methodologies for medical device prioritization under resource constraints will be discussed. Methods/design Searches of both bibliographic and grey literature will be conducted to identify documents relating to the procurement of medical devices in LMICs. Data will be extracted according to protocol on a number of pre-specified issues and variables. First, data relating to the specific settings described within the literature will be noted. Second, information relating to medical device procurement methodologies will be extracted, including prioritization of procurement under resource constraints, the use of evidence (e.g. cost-effectiveness evaluations, burden of disease data) as well as stakeholders participating in procurement processes. Information relating to prioritization methodologies will be extracted in the form of quotes or keywords, and analysis will include qualitative meta-summary. Narrative synthesis will be employed to analyse data otherwise extracted. The PRISMA guidelines for reporting will be followed. Discussion The current review will identify recommended medical device procurement methodologies for LMICs. Prioritization methods for medical device acquisition will be explored. Relevant stakeholders, facilitators and barriers will be discussed. The review is aimed at both LMIC decision makers and the international research community and hopes to offer a first holistic conceptualization of this topic. PMID:25336161
Municipal consortia for medicine procurement: impact on the stock-out and budget.
Amaral, Silvâni Maria Sehnem de; Blatt, Carine Raquel
2011-08-01
The study evaluated the impact of the consortia on the budget and shortage of medicines for the basic pharmaceutical assistance component in Indaial municipality, Southern Brazil. The number of items with a stock out for at least one day decreased by 12% from 2008 to 2007 and 48% from 2009 to 2007; total costs decreased by 33%, when comparing procurement by consortia (2009) to municipal procurement (2007), and by 18% when compared to the average values of the 2009 Health Prices Database from the Ministry of Health. The procurement of medicines by the consortia decreased stock outs and represented an economy of scale, allowing for the procurement of a greater quantity of products with the same budget.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.936 Procurement. (a) Sections 35.936 through 35.939 set forth policies and minimum standards for procurement of architectural or... under all steps of grants for construction of treatment works. Acquisition of real property shall be...
22 CFR 226.40 - Purpose of procurement standards.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Purpose of procurement standards. 226.40 Section 226.40 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.40 Purpose...
22 CFR 226.49 - USAID-Specific procurement requirements
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false USAID-Specific procurement requirements 226.49 Section 226.49 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.49 USAID...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
... Organization Government Procurement Agreement. DATES: Effective date: June 11, 2010. FOR FURTHER INFORMATION..., Taiwan became a designated country under the World Trade Organization Government Procurement Agreement... World Trade Organization Government Procurement Agreement countries in the trade agreement provisions...
48 CFR 23.204 - Procurement exemptions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR ® or FEMP-designated product if the head of the agency...
48 CFR 23.204 - Procurement exemptions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR® or FEMP-designated product if the head of the agency...
48 CFR 23.204 - Procurement exemptions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR ® or FEMP-designated product if the head of the agency...
48 CFR 23.204 - Procurement exemptions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR® or FEMP-designated product if the head of the agency...
48 CFR 23.204 - Procurement exemptions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR ® or FEMP-designated product if the head of the agency...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-06
... DEPARTMENT OF AGRICULTURE 48 CFR Part 422 RIN 0599-AA19 Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law Violations; Withdrawal AGENCY: Office of Procurement and Property Management, Departmental Management, Department of Agriculture. ACTION: Proposed rule...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-06
... DEPARTMENT OF AGRICULTURE 48 CFR Part 422 RIN 0599-AA19 Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law Violations; Withdrawal AGENCY: Office of Procurement and Property Management, Departmental Management, Department of Agriculture. ACTION: Direct Final...
77 FR 42339 - Improving Contracting Officers' Access to Relevant Integrity Information
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-18
... OFFICE OF MANAGEMENT AND BUDGET Office of Federal Procurement Policy Improving Contracting Officers' Access to Relevant Integrity Information AGENCY: Office of Federal Procurement Policy, Office of Management and Budget. ACTION: Notice of Request for Comment. SUMMARY: The Office of Federal Procurement...
48 CFR 1302.101 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... and Assistant Secretary for Administration, the head of the agency for procurement matters shall be... means an individual designated authority by the Senior Bureau Procurement Official (BPO) to enter into... positions, the Head of the Agency, the Procurement Executive, and the Heads of Operating Units are also...
48 CFR 3.104-5 - Disqualification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... notice of disqualification from further participation in the procurement to the contracting officer, the... supervisor. As a minimum, the notice must— (1) Identify the procurement; (2) Describe the nature of the agency official's participation in the procurement and specify the approximate dates or time period of...
48 CFR 725.705 - Local procurement-contract clause.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Local procurement-contract... DEVELOPMENT SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.705 Local procurement—contract clause. Local procurement may be undertaken in accordance with the provisions of 22 CFR...
48 CFR 725.705 - Local procurement-contract clause.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Local procurement-contract... DEVELOPMENT SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.705 Local procurement—contract clause. Local procurement may be undertaken in accordance with the provisions of 22 CFR...
75 FR 58366 - Procurement List Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-24
... Center, Great Lakes, IL. NPA: Challenge Unlimited, Inc., Alton, IL. Contracting Activity: Dept of the... AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to the Procurement List. SUMMARY: This action adds services to the Procurement List that will be provided by...
1999-10-26
The audit objective was to determine whether violations of procurement regulations occurred regarding procurement of selected components of the Army...Crusader vehicle and the Joint Strike Fighter aircraft. However, during the audit , we determined that the allegations involved the Army Composite
75 FR 56996 - Procurement List Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-17
... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List Additions and Deletions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION... the Procurement List that will be furnished by nonprofit agencies employing persons who are blind or...
76 FR 72908 - Procurement List Proposed Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-28
... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed... Procurement List that will be furnished by nonprofit agencies employing persons who are blind or have other...
78 FR 12296 - Procurement List; Proposed Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-22
... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed Additions to the Procurement List. SUMMARY: The Committee is proposing to add products and services to the...
5 CFR 300.506 - Requirements of procurement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... must follow the Federal procurement laws and the Federal Acquisition Regulation, as applicable, in... Federal procurement system to make clear that the firm is the legally responsible employer and to specify... the types and levels of skills to be provided, deadlines for providing service, liability insurance...
76 FR 56883 - Designation of Product Categories for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-14
... and should document exceptions taken for price, performance, and availability. USDA recognizes that...) requires USDA to provide information to procuring agencies on the availability, relative price, performance... a product designated by EPA generally to procure such a product composed of the highest percentage...
76 FR 14572 - Federal Acquisition Regulation; Technical Amendments
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... Acquisition Regulations. List of Subjects in 48 CFR Parts 18, 19, and 52 Government procurement. Dated: March... in paragraph (b) by removing ``http:// www.whitehouse.gov/omb/procurement/guides/emergency_acquisitions_ guide.pdf'' and adding ``http://www.whitehouse.gov/sites/default/files/ omb/assets/procurement...
75 FR 36362 - Procurement List Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-25
... additions to the Procurement List. Glove, Mechanic's A commercial company submitted comments objecting to... provide the mechanic's gloves in compliance with the Acts cited by CamelBak in its correspondence to the... Accordingly, the following products and services are added to the Procurement List: Products Glove, Mechanic's...
7 CFR 215.14a - Procurement standards.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.14a Procurement standards. (a... Management and Budget Circulars, concerning the procurement of all goods and services with nonprofit school...
7 CFR 215.14a - Procurement standards.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.14a Procurement standards. (a... Management and Budget Circulars, concerning the procurement of all goods and services with nonprofit school...
7 CFR 215.14a - Procurement standards.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.14a Procurement standards. (a... Management and Budget Circulars, concerning the procurement of all goods and services with nonprofit school...
7 CFR 215.14a - Procurement standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.14a Procurement standards. (a... Management and Budget Circulars, concerning the procurement of all goods and services with nonprofit school...
7 CFR 215.14a - Procurement standards.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.14a Procurement standards. (a... Management and Budget Circulars, concerning the procurement of all goods and services with nonprofit school...
7 CFR 226.22 - Procurement standards.
Code of Federal Regulations, 2010 CFR
2010-01-01
... pertinent to the following: rationale for the method of procurement, selection of contract type, contractor... competition. The description may include a statement of the qualitative nature of the material, product or... technical resources. (i) Program procurements shall be made by one of the following methods: (1) Small...
13 CFR 124.507 - What procedures apply to competitive 8(a) procurements?
Code of Federal Regulations, 2010 CFR
2010-01-01
... boundaries are eligible to submit offers. (3) Competition for all non-construction requirements. Except for... procedures. Procuring activities will conduct competitions among and evaluate offers received from... the Participant submitted its initial offer which includes price. (5) If the procuring activity...
The Wheelchair Procurement Process: Perspectives of Clients and Prescribers
Mortenson, William B; Miller, William C
2014-01-01
Back ground Increasing choices in assistive technology has made the process of procuring a wheelchair more complex and challenging. Purpose To explore the intricacies of the procurement process from the perspectives of clients and therapists. Methods Thirty-four participants were interviewed, including 13 wheelchair prescribers, 14 wheelchair users, and 7 wheelchair associates (family members and caregivers). Findings Analysis revealed five main themes. 1) “Who decides?” described varying degrees of client involvement in the procurement process. 2) “Expert knowledge” reflected the expert knowledge that all parties possessed. 3) “Form versus function” captured the primary and, at times, conflicting outcomes that participants wanted to achieve. 4) “Fitting in” depicted the environmental factors that affected wheelchair procurement. 5) “(Re)solutions” illustrated strategies that participants felt improved the process. Implications This study reveals clients’ experiences with wheelchair procurement, identifies potential issues therapists may encounter, and suggests possible remedies they might consider when prescribing wheelchairs within a client-centred framework. PMID:18615928
Theodorou, Mamas; Georgiou, Marina; Nikolentzos, Athanasios; Bellali, Thalia
2015-04-19
Hospital procurement is a crucial field for any health care system, not only for economic reasons but also for reasons related to the quality and safety of the services provided. That is why the process of procurement is, in most countries, governed by a strict legal framework and policy mechanisms. This study investigates the problems and inefficiencies associated with the procurement of medical devices in public hospitals in Cyprus and formulates empirically documented proposals for improvement. Using the Delphi method, a group of 38 experts approach the procurement system in Cyprus from different angles, achieving high rates of consensus on 35 different statements on the weaknesses and problems of the current medical device procurement system, as well as presenting proposals and recommendations for improvement. The findings are highly valuable for future policy initiatives in Cyprus in the light of the economic crisis and the expected implementation of the new General Health Insurance System (GeSY), which the Government of the Republic of Cyprus and the Troika has agreed.
Critical analysis of procurement techniques in construction management sectors
NASA Astrophysics Data System (ADS)
Tiwari, Suman Tiwari Suresh; Chan, Shiau Wei; Faraz Mubarak, Muhammad
2018-04-01
Over the last three decades, numerous procurement techniques have been one of the highlights of the Construction Management (CM) for ventures, administration contracting, venture management as well as design and construct. Due to the development and utilization of those techniques, various researchers have explored the criteria for their choice and their execution in terms of time, cost and quality. Nevertheless, there is a lack of giving an account on the relationship between the procurement techniques and the progressed related issues, for example, supply chain, sustainability, innovation and technology development, lean construction, constructability, value management, Building Information Modelling (BIM) as well as e-procurement. Through chosen papers from the reputable CM-related academic journals, the specified scopes of these issues are methodically assessed with the objective to explore the status and trend in procurement related research. The result of this paper contributes theoretically as well as practically to the researchers and industrialist in order to be aware and appreciate the development of procurement techniques.
Changes in the organ procurement system in South Korea: effects on brain-dead donor numbers.
Lee, S D; Kim, J H
2009-11-01
In Korea, the Organ Transplantation Act came into effect in 2000, establishing the Korean Network for Organ Sharing (KONOS) with centralized authority for organ procurement as well as for approval of donors and recipients to ensure fair organ allocation. However, the number of brain-dead donors decreased sharply, and the organ allocation system proved inefficient. The government revised the Organ Transplantation Act in August 2002, introducing an incentive system. If a transplantation hospital formed a Committee for Brain Death Evaluation and a Hospital Organ Procurement Organization, it could receive a kidney from a brain dead-donor as an incentive to foster organ procurement regardless of the KONOS wait list. The government also launched a pilot brain-dead donor registry program to strengthen Hospital Organ Procurement Organization activity. If local hospitals collaborated with specialized hospitals in organ procurement, local hospitals obtained financial incentives. But because the organ shortage problem has not been resolved, the government has proposed four initiatives: first, broadening the incentive system, which makes it possible to give each specialized hospital a choice of one of eight organs from each donor as an incentive; second, development of an Independent Organ Procurement Organization; third introduction of an opt-out system; and last, improvement of the Committee for Brain Death Evaluation system. It is uncertain which initiatives will be adopted, but changes in organ procurement systems are nonetheless considered a key to solve the organ shortage problem in Korea.
Kim D., Raine; Kayla, Atkey; Dana Lee, Dana Lee; Alexa R., Ferdinands; Dominique, Beaulieu; Susan, Buhler; Norm, Campbell; Brian, Cook; Mary, L’Abbé; Ashley, Lederer; David, Mowat; Joshna, Maharaj; Candace, Nykiforuk; Jacob, Shelley; Jacqueline, Street
2018-01-01
Abstract Introduction: Unhealthy foods are widely available in public settings across Canada, contributing to diet-related chronic diseases, such as obesity. This is a concern given that public facilities often provide a significant amount of food for consumption by vulnerable groups, including children and seniors. Healthy food procurement policies, which support procuring, distributing, selling, and/or serving healthier foods, have recently emerged as a promising strategy to counter this public health issue by increasing access to healthier foods. Although numerous Canadian health and scientific organizations have recommended such policies, they have not yet been broadly implemented in Canada. Methods: To inform further policy action on healthy food procurement in a Canadian context, we: (1) conducted an evidence synthesis to assess the impact of healthy food procurement policies on health outcomes and sales, intake, and availability of healthier food, and (2) hosted a consensus conference in September 2014. The consensus conference invited experts with public health/nutrition policy research expertise, as well as health services and food services practitioner experience, to review evidence, share experiences, and develop a consensus statement/recommendations on healthy food procurement in Canada. Results: Findings from the evidence synthesis and consensus recommendations for healthy food procurement in Canada are described. Specifically, we outline recommendations for governments, publicly funded institutions, decision-makers and professionals, citizens, and researchers. Conclusion: Implementation of healthy food procurement policies can increase Canadians’ access to healthier foods as part of a broader vision for food policy in Canada. PMID:29323862
Procurement Cards Pave the Way to Efficient Purchasing.
ERIC Educational Resources Information Center
Enos, Eileen D.
1999-01-01
As educators battle restricted budgets, inflation, and enrollment changes, strategic sourcing management is replacing traditional transaction-based procurement. Procurement-card programs, allowing organizations to use credit cards for small purchases or low-value items, save time and enhance controls over merchants, credit limits, issuance limits,…
ERIC Educational Resources Information Center
Briggs, Linda L.
2007-01-01
This article describes the benefits one gets when big schools roll out highly effective eProcurement systems--strategic improvements and savings. eProcurement systems are hot again in higher education, driven by unrelenting cost containment demands, along with industry shifts that have consolidated choices and brought top products to the…
77 FR 12816 - Procurement List; Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-02
... Procurement List. SUMMARY: This action adds products to the Procurement List that will be furnished by... capability of qualified nonprofit agencies to provide the products and impact of the additions on the current or most recent contractors, the Committee has determined that the products listed below are suitable...
40 CFR 35.6550 - Procurement system standards.
Code of Federal Regulations, 2010 CFR
2010-07-01
...'s procurement system or procurement action under a Cooperative Agreement. (3) Code of conduct. The recipient must comply with the requirements of 40 CFR 31.36(b)(3), which describes standards of conduct for... release must include EPA concurrence. (3) Certification of independent price determination. The recipient...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... Procurement of Major Systems of the Department of Defense.'' DATES: Effective Date: September 8, 2010. FOR... 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations System. 0... funding or reprogramming for procurement of a major system under a multiyear contract authorized under...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-22
... Subjects in 48 CFR Part 217 Government procurement. Mary Overstreet, Editor, Defense Acquisition... Federal Acquisition Regulation Supplement; Limitations on Procurements With Non-Defense Agencies (DFARS...: Final rule. SUMMARY: DoD is adopting without change an interim rule amending the Defense Federal...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... DEPARTMENT OF AGRICULTURE 48 CFR Part 422 RIN 0599-AA19 Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law Violations AGENCY: Office of Procurement and Property Management, Department of Agriculture. ACTION: Direct final rule. SUMMARY: The Office of...
48 CFR 403.101-3 - Agency regulations.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) The standards of conduct for USDA procurement officials are the uniform standards established by the Office of Government Ethics in 5 CFR Part 2635, Standards of Ethical Conduct for Employees of the Executive Branch, and FAR 3.104, Procurement integrity. (b) Procurement officials and other employees who...
Code of Federal Regulations, 2010 CFR
2010-10-01
... a contract from the policy in FAR 3.601, after the Procurement Review Board and the agency ethics... agency ethics official, the Procurement Review Board, and written approval by the Assistant Secretary for... director of the cognizant program office to the HCA. In the procurement request, the director must describe...
75 FR 6869 - Procurement List; Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-12
... documents other than rules #0;or proposed rules that are applicable to the public. Notices of hearings #0... Blind or Severely Disabled. ACTION: Additions to the Procurement List. SUMMARY: This action adds to the... Procurement List. After consideration of the material presented to it concerning capability of qualified...
42 CFR 486.320 - Condition: Participation in Organ Procurement and Transplantation Network.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Condition: Participation in Organ Procurement and Transplantation Network. 486.320 Section 486.320 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES....320 Condition: Participation in Organ Procurement and Transplantation Network. After being designated...
42 CFR 486.320 - Condition: Participation in Organ Procurement and Transplantation Network.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 5 2011-10-01 2011-10-01 false Condition: Participation in Organ Procurement and Transplantation Network. 486.320 Section 486.320 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES....320 Condition: Participation in Organ Procurement and Transplantation Network. After being designated...
48 CFR 908.7107 - Procurement and use of industrial alcohol.
Code of Federal Regulations, 2011 CFR
2011-10-01
... industrial alcohol. 908.7107 Section 908.7107 Federal Acquisition Regulations System DEPARTMENT OF ENERGY....7107 Procurement and use of industrial alcohol. (a) This section covers the procurement of industrial alcohol by DOE or authorized contractors and the applicable policies and delegations of authority to...
77 FR 53802 - Procurement, Management, and Administration of Engineering and Design Related Services
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-04
...-2012-0043] RIN 2125-AF44 Procurement, Management, and Administration of Engineering and Design Related... regulations governing the procurement, management, and administration of engineering and design related... . Background The FHWA proposes to modify existing regulations for the administration of engineering and design...
41 CFR 101-26.302 - Standard and optional forms.
Code of Federal Regulations, 2013 CFR
2013-07-01
... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...
41 CFR 101-26.301-1 - Similar items.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...
41 CFR 101-26.301-1 - Similar items.
Code of Federal Regulations, 2012 CFR
2012-07-01
....301-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...
41 CFR 101-26.301-1 - Similar items.
Code of Federal Regulations, 2011 CFR
2011-07-01
...-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...
41 CFR 101-26.302 - Standard and optional forms.
Code of Federal Regulations, 2011 CFR
2011-07-01
... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...
41 CFR 101-26.301-1 - Similar items.
Code of Federal Regulations, 2014 CFR
2014-07-01
...-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...
41 CFR 101-26.301-1 - Similar items.
Code of Federal Regulations, 2013 CFR
2013-07-01
...-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...
41 CFR 101-26.302 - Standard and optional forms.
Code of Federal Regulations, 2012 CFR
2012-07-01
... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...
41 CFR 101-26.302 - Standard and optional forms.
Code of Federal Regulations, 2010 CFR
2010-07-01
... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...
41 CFR 101-26.302 - Standard and optional forms.
Code of Federal Regulations, 2014 CFR
2014-07-01
... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...
78 FR 23542 - Procurement List Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
...: Federal Acquisition Service, GSA/FSS OFC SUP CTR--Paper Products, New York, NY Coverage: A-List for the..., NY Contracting Activity: Federal Acquisition Service, GSA/FSS OFC SUP CTR--Paper Products, New York... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be...
77 FR 29596 - Procurement List Proposed Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
.../Location: Laundry Service, Veterans Administration Medical Center (VAMC), (offsite: 1809 W 2nd Avenue... Additions to the Procurement List. SUMMARY: The Committee is proposing to add products and services to the... identified in this notice will be required to procure the products and services listed below from nonprofit...
7 CFR 277.14 - Procurement standards.
Code of Federal Regulations, 2013 CFR
2013-01-01
... must fulfill and all other factors to be used in evaluating bids or proposals. (2) State agencies shall... simple and informal procurement methods that are sound and appropriate for a procurement of services... negotiation, proposals are requested from a number of sources and the Request for Proposal is publicized...
77 FR 40343 - Procurement List; Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-09
... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be... concerning capability of qualified nonprofit agencies to provide the products and services and impact of the additions on the current or most recent contractors, the Committee has determined that products and services...
76 FR 57719 - Procurement List; Proposed Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... the Federal Government identified in this notice will be required to procure the products and services... to furnish the products and services to the Government. 3. There are no known regulatory alternatives... with the products and services proposed for addition to the Procurement List. Comments on this...
7 CFR 277.14 - Procurement standards.
Code of Federal Regulations, 2010 CFR
2010-01-01
... qualitative nature of the material, product or service desired and, when necessary, shall set forth those... technical resources. (g) Procurement methods. State agency procurements made in whole or in part with program funds shall be by one of the following methods: (1) Small purchase procedures are those relatively...
32 CFR 516.62 - PFD and HQ USACIDC coordination.
Code of Federal Regulations, 2011 CFR
2011-07-01
... AUTHORITIES AND PUBLIC RELATIONS LITIGATION Remedies in Procurement Fraud and Corruption § 516.62 PFD and HQ... procurement fraud or corruption investigations being conducted by USACIDC and possible remedies. These... affected by a significant investigation of fraud or corruption that relates to DOD procurement activities...
7 CFR 1407.3 - Procurement debarment and suspension.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Procurement debarment and suspension. CCC will proceed under this part when taking action to debar or suspend contractors with CCC or participants or potential participants in CCC's procurement activities. CCC will apply... debarring and suspending official will be the Executive Vice President, CCC, or a designee. ...
7 CFR 1407.3 - Procurement debarment and suspension.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Procurement debarment and suspension. CCC will proceed under this part when taking action to debar or suspend contractors with CCC or participants or potential participants in CCC's procurement activities. CCC will apply... debarring and suspending official will be the Executive Vice President, CCC, or a designee. ...
7 CFR 1407.3 - Procurement debarment and suspension.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Procurement debarment and suspension. CCC will proceed under this part when taking action to debar or suspend contractors with CCC or participants or potential participants in CCC's procurement activities. CCC will apply... debarring and suspending official will be the Executive Vice President, CCC, or a designee. ...
7 CFR 1407.3 - Procurement debarment and suspension.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Procurement debarment and suspension. CCC will proceed under this part when taking action to debar or suspend contractors with CCC or participants or potential participants in CCC's procurement activities. CCC will apply... debarring and suspending official will be the Executive Vice President, CCC, or a designee. ...
7 CFR 1407.3 - Procurement debarment and suspension.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Procurement debarment and suspension. CCC will proceed under this part when taking action to debar or suspend contractors with CCC or participants or potential participants in CCC's procurement activities. CCC will apply... debarring and suspending official will be the Executive Vice President, CCC, or a designee. ...
32 CFR 516.60 - Procurement fraud and irregularities programs at MACOMs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 3 2010-07-01 2010-07-01 true Procurement fraud and irregularities programs at MACOMs. 516.60 Section 516.60 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES AND PUBLIC RELATIONS LITIGATION Remedies in Procurement Fraud and Corruption...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requisitioning data...
19 CFR 111.38 - False representation to procure employment.
Code of Federal Regulations, 2012 CFR
2012-04-01
... procure employment in any customs matter. In addition, a broker must not represent to a client or... 19 Customs Duties 1 2012-04-01 2012-04-01 false False representation to procure employment. 111.38 Section 111.38 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY...
19 CFR 111.38 - False representation to procure employment.
Code of Federal Regulations, 2011 CFR
2011-04-01
... procure employment in any customs matter. In addition, a broker must not represent to a client or... 19 Customs Duties 1 2011-04-01 2011-04-01 false False representation to procure employment. 111.38 Section 111.38 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY...
19 CFR 111.38 - False representation to procure employment.
Code of Federal Regulations, 2013 CFR
2013-04-01
... procure employment in any customs matter. In addition, a broker must not represent to a client or... 19 Customs Duties 1 2013-04-01 2013-04-01 false False representation to procure employment. 111.38 Section 111.38 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY...
19 CFR 111.38 - False representation to procure employment.
Code of Federal Regulations, 2014 CFR
2014-04-01
... procure employment in any customs matter. In addition, a broker must not represent to a client or... 19 Customs Duties 1 2014-04-01 2014-04-01 false False representation to procure employment. 111.38 Section 111.38 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY...
19 CFR 111.38 - False representation to procure employment.
Code of Federal Regulations, 2010 CFR
2010-04-01
... procure employment in any customs matter. In addition, a broker must not represent to a client or... 19 Customs Duties 1 2010-04-01 2010-04-01 false False representation to procure employment. 111.38 Section 111.38 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-24
... Best Practices for Interaction Between Medical Examiner/Coroner and Organ and Tissue Procurement... titled ``Organ and Tissue Procurement Committee Standards and Best Practices for Interaction Between Medical Examiner/Coroner Offices and Organ Tissue Procurement Organizations'' from May 12, 2012, to June...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-19
... DEPARTMENT OF DEFENSE Negotiation of a Reciprocal Defense Procurement Memorandum of Understanding With the Czech Republic AGENCY: Department of Defense (DoD). ACTION: Request for public comments. SUMMARY: DoD is contemplating a Reciprocal Defense Procurement Memorandum of Understanding with the Czech...
76 FR 54242 - Agency Information Collection Activities: Post-Award Contract Information
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-31
... Information AGENCY: Office of Chief Procurement Officer, DHS. ACTION: 60-Day notice and request for comments; Extension without change. SUMMARY: The Department of Homeland Security, Office of Chief Procurement Officer... about this Information Collection Request should be forwarded to the Office of Chief Procurement Officer...
75 FR 34282 - Federal Acquisition Regulation; FAR Case 2009-014, New Designated Country-Taiwan
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-16
... Government Procurement. DATES: Effective Date: June 16, 2010. FOR FURTHER INFORMATION CONTACT: Ms. Lori... Government Procurement. The interim rule added Taiwan to the list of World Trade Organization Government... seq., because, although this rule opens up Government procurement to the goods and services of Taiwan...
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may... design/build, construction management at risk and force account. If an alternate method is used, the... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Allowable methods of procurement...
A STUDY OF FORMALLY ADVERTISED PROCUREMENT
As a method of procuring goods and services, formally advertised procurement offers a number of advantages. These include the prevention of fraud and...two-thirds of all contracts are let in these cases. This is done by examining over 2,300 contracts let under formal advertising procedures. A measure of
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-31
... discriminatory barriers to procurements of supplies and services produced by industrial enterprises of the other... a designated country under the World Trade Organization Government Procurement Agreement. II..., the U.S. Secretary of Defense signed a new reciprocal defense procurement agreement with the Polish...
Code of Federal Regulations, 2013 CFR
2013-07-01
... procurements, contain features which unduly restrict competition. The description may include a statement of... requirements of a procurement. The specific features of the named brand which must be met by offerors shall be...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American...
Code of Federal Regulations, 2012 CFR
2012-07-01
... procurements, contain features which unduly restrict competition. The description may include a statement of... requirements of a procurement. The specific features of the named brand which must be met by offerors shall be...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American...
Code of Federal Regulations, 2014 CFR
2014-07-01
... procurements, contain features which unduly restrict competition. The description may include a statement of... requirements of a procurement. The specific features of the named brand which must be met by offerors shall be...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American...
49 CFR 624.9 - Grant requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF TRANSPORTATION CLEAN FUELS GRANT PROGRAM § 624.9 Grant requirements. A grant under this section... under lease or otherwise. (f) Use of competitive procurements. Pursuant to 49 U.S.C. 5307(d)(1)(E), the grant applicant shall certify that it will use competitive procurements and will not use procurements...
48 CFR 3.104-3 - Statutory and related prohibitions, restrictions, and requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... disclosing procurement information (subsection 27(a) of the Act). (1) A person described in paragraph (a)(2... proposal information or source selection information before the award of a Federal agency procurement... to, a Federal agency procurement; and (ii) By virtue of that office, employment, or relationship, has...
75 FR 7450 - Procurement List: Proposed Addition and Deletion
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List: Proposed Addition and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION... Procurement List a service to be furnished by a nonprofit agency employing persons who are blind or have other...
42 CFR 457.940 - Procurement standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Procurement standards. 457.940 Section 457.940... Integrity § 457.940 Procurement standards. (a) A State must submit to CMS a written assurance that title XXI... public or private payment rates for comparable services for comparable populations, consistent with...
78 FR 56680 - Procurement List; Proposed Addition and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-13
..., Santurce, PR. NPA: The Corporate Source, Inc., New York, NY. Contracting Activity: GSA/Public Buildings.... ACTION: Proposed Addition to and Deletions from the Procurement List. SUMMARY: The Committee is proposing to add a service to the Procurement List that will be provided by a nonprofit agency employing...
76 FR 27274 - Defense Federal Acquisition Regulation Supplement; Technical Amendment
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-11
... procurement programs, it must provide written notice of the determination to the GSA Suspension and Debarment Official. List of Subjects in 48 CFR Part 209 Government procurement. Ynette R. Shelkin, Editor, Defense... suspended from procurement programs, it must provide written notice of the determination to the General...
77 FR 15736 - Procurement List; Proposed Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-16
... additions to the Procurement List. SUMMARY: The Committee is proposing to add a product and services to the... identified in this notice will be required to procure the product and services listed below from nonprofit... entities other than the small organizations that will furnish the product and services to the Government. 2...
48 CFR 504.602-71 - Federal Procurement Data System-Public access to data.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Procurement Data System—Public access to data. (a) The FPDS database. The General Services Administration awarded a contract for creation and operation of the Federal Procurement Data System (FPDS) database. That database includes information reported by departments and agencies as required by Federal Acquisition...
48 CFR 504.602-71 - Federal Procurement Data System-Public access to data.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Procurement Data System—Public access to data. (a) The FPDS database. The General Services Administration awarded a contract for creation and operation of the Federal Procurement Data System (FPDS) database. That database includes information reported by departments and agencies as required by Federal Acquisition...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-16
... general, to provide the public the option of submitting information or transacting business electronically... Office of Procurement and Property Management; Guidelines for the Transfer of Excess Computers or Other... Property Management, USDA. ACTION: Proposed rule. SUMMARY: The Office of Procurement and Property...
76 FR 37069 - Procurement List; Proposed Additions and Deletion
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
... products and a service to the Procurement List that will be furnished by nonprofit agencies employing... will be required to procure the products and service listed below from nonprofit agencies employing... other than the small organizations that will furnish the products and service to the Government. 2. If...
76 FR 29210 - Procurement List; Proposed Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... Type/Location: Laundry Services, U.S. Naval Hospital & Naval Dental Clinic Base, Farenholt Road, Agana... additions to the Procurement List. SUMMARY: The Committee is proposing to add products and services to the... identified in this notice will be required to procure the products and services listed below from nonprofit...
75 FR 14576 - Procurement List Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-26
... Inspection Service, Minneapolis, MN. M.R. Laundry Products NSN: MR 1103--Heavy Duty Laundry Bag. NSN: MR 1104... procurement list. SUMMARY: This action adds to the Procurement List products and services to be furnished by... products and services and impact of the additions on the current or most recent contractors, the Committee...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-29
... Procurement Service Area AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS. ACTION: Notice with... require the hospital to enter into an agreement with its designated Organ Procurement Organization (OPO... Organ Procurement Organizations (OPOs) are not-for-profit organizations that are responsible for the...
19 CFR 162.11 - Authority to procure warrants.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 19 Customs Duties 2 2010-04-01 2010-04-01 false Authority to procure warrants. 162.11 Section 162.11 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) INSPECTION, SEARCH, AND SEIZURE Search Warrants § 162.11 Authority to procure...
49 CFR 661.6 - Certification requirements for procurement of steel or manufactured products.
Code of Federal Regulations, 2010 CFR
2010-10-01
... § 661.6 Certification requirements for procurement of steel or manufactured products. If steel, iron, or... 49 Transportation 7 2010-10-01 2010-10-01 false Certification requirements for procurement of steel or manufactured products. 661.6 Section 661.6 Transportation Other Regulations Relating to...
75 FR 54115 - Procurement List: Proposed Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
... proposing to add services to the Procurement List that will be furnished by nonprofit agencies employing persons who are blind or have other severe disabilities and to delete products previously furnished by... Government identified in this notice will be required to procure the services listed below from nonprofit...
76 FR 53113 - Guidelines for Designating Biobased Products for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-25
.... Information regarding the Federal biobased preferred procurement program (one part of the BioPreferred Program... Request: Extension of a currently approved information collection. Abstract: The USDA BioPreferred Program... that then permit USDA to designate items for preferred procurement under the BioPreferred Program. Once...
32 CFR 507.17 - Procurement and wear of heraldic items.
Code of Federal Regulations, 2010 CFR
2010-07-01
... controlled heraldic items, when authorized by local procurement procedures, may forward a sample insignia to... 32 National Defense 3 2010-07-01 2010-07-01 true Procurement and wear of heraldic items. 507.17... AUTHORITIES AND PUBLIC RELATIONS MANUFACTURE AND SALE OF DECORATIONS, MEDALS, BADGES, INSIGNIA, COMMERCIAL USE...
40 CFR 35.936-21 - Delegation to State agencies; certification of procurement systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
...; certification of procurement systems. 35.936-21 Section 35.936-21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.936-21 Delegation to State agencies; certification of procurement...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-11
... follows: 1. Compliance With Financial Management Regulations Comment: Public Law 110-181 states that the...] RIN 0750-AG24 Defense Federal Acquisition Regulation Supplement; Limitation on Procurements on Behalf... Acquisition Regulation Supplement (DFARS) to address statutory provisions relating to interagency procurements...
32 CFR 516.60 - Procurement fraud and irregularities programs at MACOMs.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 3 2011-07-01 2009-07-01 true Procurement fraud and irregularities programs at MACOMs. 516.60 Section 516.60 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES AND PUBLIC RELATIONS LITIGATION Remedies in Procurement Fraud and Corruption...
48 CFR 19.403 - Small Business Administration breakout procurement center representatives.
Code of Federal Regulations, 2013 CFR
2013-10-01
... center, technical data necessary for the preparation of a competitive solicitation package for any item... arising out of restrictions on the rights of the United States in technical data and, when appropriate... data; (5) Have access to procurement records and other data of the procurement center commensurate with...
Procurement of prescriber support systems.
Kajbjer, Karin
2008-01-01
Supporting the process of medication selection and electronic management of prescriptions is a high priority issue in the eHealth strategies of many countries today. Procuring such systems can be quite difficult, especially if one should encourage suppliers from different countries to participate. The new ISO Technical Report 22,790 provides a new approach to facilitate this process by giving an international basis for specifying the functional characteristics desired. The paper describes the content of the report and discusses the procurement process in the light of the European public procurement directive and patient safety.
Industrial application experiment series
NASA Technical Reports Server (NTRS)
Bluhm, S. A.
1981-01-01
Two procurements within the Industrial Application Experiment Series of the Thermal Power Systems Project are discussed. The first procurement, initiated in April 1980, resulted in an award to the Applied Concepts Corporation for the Capital Concrete Experiment: two Fresnel concentrating collectors will be evaluated in single-unit installations at the Jet Propulsion Laboratory Parabolic Dish Test Site and at Capitol Concrete Products, Topeka, Kansas. The second procurement, initiated in March 1981, is titled, "Thermal System Engineering Experiment B." The objective of the procurement is the rapid deployment of developed parabolic dish collectors.
1984-02-01
for tactical air power projection. The F/A-18 will replace aging F-4 and A-7 aircraft. The total programed procurement of F/A-18 aircraft is 1,377...inner zone anti-submarine .arfars helicopter which is needed to modernize aging CV assets. P-3C (Patrol) ORION (Dollars in Millions) FY 1985 FY 1986...tE MAVERICK modification. By modifying the Armament Station Control Unit ( ASCU ), procuring single rail launchers (iAU-117) and interfacing MAVERICT
Consolidation Needed for Procurements of DoD H-60 Helicopter Spare Parts (REDACTED)
2016-10-12
Information Act. Report No. DODIG-2017-002 O C T O B E R 1 2 , 2 0 1 6 Consolidation Needed for Procurements of DoD H -60 Helicopter Spare Parts I N T E G R...Brief Consolidation Needed for Procurements of DoD H -60 Helicopter Spare Parts October 12, 2016 Visit us at www.dodig.mil Objective We determined...whether DoD was effectively managing the procurement of H -60 helicopter ( H -60) spare parts. The Army, Navy, Air Force, and U.S. Special Operations
Optimal Black Start Resource Allocation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Qiu, Feng; Wang, Jianhui; Chen, Chen
The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. Achieving this goal requires that resource procurement planning takes the restoration process into account. In this study, we integrate the BS resource procurement decision with a restoration planning model and develop an optimization model that produces a minimal cost procurement plan that satisfies the restoration time requirement.
Organ procurement: Spanish transplant procurement management.
Manyalich, Martí; Mestres, Carlos A; Ballesté, Chloë; Páez, Gloria; Valero, Ricard; Gómez, María Paula
2011-06-01
Transplantation is an accepted therapeutic option to save or improve the quality of life when organ failure occurs or tissue replacements are needed. However, the lack of organs is the major limitation. The deceased organ procurement organization and professionals provide the solution to this international problem. In this review, we identify the elements involved in the organ procurement management process to analyze the possibility of implementation of deceased organ procurement for a transplantation program. While the donation rates are subject to several negative factors including religious, economic, cultural, and legal issues, the existence of well-trained professionals may considerably increase them. Professional training in organ donation along with the establishment of a solid organizational system has been identified as the crucial factor in developing efficient organ donation and transplantation programs.
PROMIS (Procurement Management Information System)
NASA Technical Reports Server (NTRS)
1987-01-01
The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.
Tyllinen, Mari; Kaipio, Johanna; Lääveri, Tinja; Nieminen, Marko
2017-01-01
This paper describes the development of a questionnaire for evaluating usability during EHR system procurement (DPUQ). Established usability questionnaires can be used to gather user feedback after using the systems. However, during procurement, experimenting with real system use is practical only with a limited number of system candidates. There is a need for less resource-demanding usability evaluation in the early stages of procurement in cases with several vendors. DPUQ has been designed for usability evaluation by end-users during special scenario-based vendor demonstrations. The questionnaire includes three sets of questions to be used during and after the vendor demonstration. DPUQ delivers specific usability scores and can be used to compare system candidates in procurement complementing other evaluation methods.
ProCure21+ should speed scheme starts.
Baillie, Jonathan
2010-11-01
This October saw the launch of the new ProCure21+ National Framework under which, the Department of Health (DH) team behind the new scheme claims, the NHS can potentially save a further pound 200 million of public money on top of the substantial sums saved under predecessor, ProCure21, via faster, more streamlined procurement, design, planning, and construction, of publicly-funded healthcare schemes. HEJ editor Jonathan Baillie discussed, with the DH's senior responsible officer (SRO) and P21+ team leader Peter Sellars, the background to the new Framework's introduction, the success of its forerunner, and the additional benefits that ProCure21 + (which is backed by organisations incuding HM Treasury, the National Audit Office, and the Office of Government Commerce) should bring to the entire healthcare building supply chain.
Transplant Tourism to China: The Impact on Domestic Patient Care Decisions
Biggins, Scott W.; Bambha, Kiran; Terrault, Norah; Inadomi, John; Roberts, John P.; Bass, Nathan
2009-01-01
Organ procurement in China has been criticized because of its reliance on executed prisoners as donors. We aimed to assess the influence of perceptions about organ procurement practices in China on domestic patient care decisions. Methods An anonymous Internet administered case-based questionnaire was used to survey an sample of healthcare professionals with affiliations to hepatology and transplantation professional societies. Results Of 674 completed surveys, the vast majority (93%) of the respondents were physicians, surgeons or allied transplant professionals actively caring for liver transplant patients and 81% practiced in the United States (US). A strong majority believed procurement practices were ethically sound in the US and Europe (87% and 73%) but fare fewer believed that procurement practices were ethically sound in China (4%, p<0.001). In case-based questions, lack of confidence in the ethical standards of organ procurement in China predicted patient-care decisions. The majority would provide post-transplantation care for patients who underwent liver transplantation at another domestic center, in a foreign country and in China (90%,78%,63%, respectively, p<0.001) yet respondents who suspected unethical procurement practices in China were more reluctant to do so (p<0.001). Conclusions Transplant professionals expressed concern about organ procurement practices in China which influenced their patient care decision-making. PMID:19191815
Transplant tourism to China: the impact on domestic patient-care decisions.
Biggins, Scott W; Bambha, Kiran; Terrault, Norah; Inadomi, John; Roberts, John P; Bass, Nathan
2009-01-01
Organ procurement in China has been criticized because of its reliance on executed prisoners as donors. We aimed to assess the influence of perceptions about organ procurement practices in China on domestic patient-care decisions. An anonymous internet administered case-based questionnaire was used to survey a sample of healthcare professionals with affiliations to hepatology and transplantation professional societies. Of 674 completed surveys, the vast majority (93%) of the respondents were physicians, surgeons or allied transplant professionals actively caring for liver transplant patients and 81% practiced in the US. A strong majority believed procurement practices were ethically sound in the US and Europe (87% and 73%) but fare fewer believed that procurement practices were ethically sound in China (4%, p < 0.001). In case-based questions, lack of confidence in the ethical standards of organ procurement in China predicted patient-care decisions. The majority would provide post-transplantation care for patients who underwent liver transplantation at another domestic center, in a foreign country and in China (90%, 78%, and 63%, respectively, p < 0.001) yet respondents who suspected unethical procurement practices in China were more reluctant to do so (p < 0.001). Transplant professionals expressed concern about organ procurement practices in China which influenced their patient-care decision-making.
Energy-efficient Public Procurement: Best Practice in Program Delivery
DOE Office of Scientific and Technical Information (OSTI.GOV)
Payne, Christopher; Weber, Andrew; Semple, Abby
2013-02-15
This document illustrates the key issues and considerations involved in implementing energy-efficient public procurement. Our primary sources of information have been our partners in the Super Efficient Equipment and Appliance Deployment (SEAD) Initiative Procurement Working Group. Where applicable, we have highlighted specific ways in which working group participants have successfully overcome barriers to delivering effective programs. The following key points emerge from this analysis of programs for energy-efficient public procurement. Lessons for both developed and developing programs are highlighted throughout the guide. 1. Policy: Policy provides the initiative to begin a transition from first cost to life-cycle cost based purchasingmore » methods and culture. Effective policy is well-communicated, establishes accountability from top to bottom of organizations and simplifies the processes necessary to comply. Flexibility and responsiveness are essential in policy development and implementation. Mandatory and voluntary policies may complement one another. 2. Procurement Criteria: Procurement staff must be confident that energy-efficient procurement criteria offer the best long-term value for their organization’s money and represent real environmental gains. Involving multiple stakeholders at the early stages of the criteria creation process can result in greater levels of cooperation from private industry. Criteria should make comparison of products easy for purchasers and require minimal additional calculations. Criteria will need to be regularly updated to reflect market developments. 3. Training: Resources for the creation of training programs are usually very limited, but well-targeted training is necessary in order for a program to be effective. Training must emphasize a process that is efficient for purchasers and simplifies compliance. Purchaser resources and policy must be well designed for training to be effective. Training program development is an excellent opportunity for collaboration amongst public authorities. 4. Procurement Processes: Many tools and guides intended to help buyers comply with energy-efficient procurement policy are designed without detailed knowledge of the procurement process. A deeper understanding of purchasing pathways allows resources to be better directed. Current research by national and international bodies aims to analyze purchasing pathways and can assist in developing future resources.« less
Strategic contracting practices to improve procurement of health commodities
Arney, Leslie; Yadav, Prashant; Miller, Roger; Wilkerson, Taylor
2014-01-01
ABSTRACT Public-sector entities responsible for procurement of essential medicines and health commodities in developing countries often lack the technical capacity to efficiently ensure supply security. Under strict public scrutiny and pressures to be transparent, many agencies continue to use archaic procurement methods and to depend on inflexible forecasts and cumbersome tendering processes. On the basis of semi-structured literature reviews and interviews, we identified framework agreements as a strategic procurement practice used by the U.S. federal government that may also be suitable for global health supply chains. Framework agreements are long-term contracts that provide the terms and conditions under which smaller repeat purchasing orders may be issued for a defined period of time. Such agreements are common in U.S. and United Nations procurement systems and in other developed countries and multilateral organizations. In contrast, framework agreements appear to be seldom used in procurement of health commodities in countries of sub-Saharan Africa. The current practice of floating tenders multiple times a year contributes to long lead times and stock-outs, and it hampers the manufacturer's or supplier's ability to plan and respond to the government's needs. To date, government's use of strategic contracting practices in public procurement of health commodities has not received much attention in most developing countries. It may present an opportunity for substantial improvements in procurement efficiency and commodity availability. Enabling legislation and strengthened technical capacity to develop and manage long-term contracts could facilitate the use of framework contracts in sub-Saharan Africa, with improved supply security and cost savings likely to result. PMID:25276589
Strategic contracting practices to improve procurement of health commodities.
Arney, Leslie; Yadav, Prashant; Miller, Roger; Wilkerson, Taylor
2014-08-01
Public-sector entities responsible for procurement of essential medicines and health commodities in developing countries often lack the technical capacity to efficiently ensure supply security. Under strict public scrutiny and pressures to be transparent, many agencies continue to use archaic procurement methods and to depend on inflexible forecasts and cumbersome tendering processes. On the basis of semi-structured literature reviews and interviews, we identified framework agreements as a strategic procurement practice used by the U.S. federal government that may also be suitable for global health supply chains. Framework agreements are long-term contracts that provide the terms and conditions under which smaller repeat purchasing orders may be issued for a defined period of time. Such agreements are common in U.S. and United Nations procurement systems and in other developed countries and multilateral organizations. In contrast, framework agreements appear to be seldom used in procurement of health commodities in countries of sub-Saharan Africa. The current practice of floating tenders multiple times a year contributes to long lead times and stock-outs, and it hampers the manufacturer's or supplier's ability to plan and respond to the government's needs. To date, government's use of strategic contracting practices in public procurement of health commodities has not received much attention in most developing countries. It may present an opportunity for substantial improvements in procurement efficiency and commodity availability. Enabling legislation and strengthened technical capacity to develop and manage long-term contracts could facilitate the use of framework contracts in sub-Saharan Africa, with improved supply security and cost savings likely to result.
41 CFR 101-26.301-2 - Issue of used, repaired, and rehabilitated items in serviceable condition.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Issue of used, repaired... and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items...
76 FR 67370 - Federal Property Management Regulation (FPMR); Procurement Sources and Programs
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-01
... to agency management and personnel. List of Subjects in 41 CFR Part 101-26 Procurement sources and... MANAGEMENT REGULATIONS PART 101-26--PROCUREMENT SOURCES AND PROGRAMS 0 1. The authority for 41 CFR part 101...; Docket Number 2011-017; Sequence 1] RIN 3090-AJ19 Federal Property Management Regulation (FPMR...
41 CFR 101-26.507-4 - Quantities in excess of the maximum order limitation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Quantities in excess of... Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.507-4 Quantities in...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requisitioning data... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26...
41 CFR 101-27.206 - Procurement of shelf-life materials.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of shelf-life materials. 101-27.206 Section 101-27.206 Public Contracts and Property Management Federal Property... MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-27.206 Procurement of shelf-life materials. ...
41 CFR 101-27.206 - Procurement of shelf-life materials.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Procurement of shelf-life materials. 101-27.206 Section 101-27.206 Public Contracts and Property Management Federal Property... MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-27.206 Procurement of shelf-life materials. ...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-10
... Government procurement. Dated: May 17, 2010. Rodney P. Lantier, Acting Senior Procurement Executive, Office... (Change 45) Docket 2008- 0007; Sequence 11] RIN 3090-AI71 General Services Administration Acquisition... CONTACT: For clarification of content, contact Beverly Cromer, Procurement Analyst, at (202) 501-1448. For...
12 CFR 328.2 - Display and procurement of official sign.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Display and procurement of official sign. 328.2 Section 328.2 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY ADVERTISEMENT OF MEMBERSHIP § 328.2 Display and procurement of official sign. (a) Display...
49 CFR 19.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Cost and price analysis. 19.45 Section 19.45... Requirements Procurement Standards § 19.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price...
76 FR 53938 - Order of Succession for the Office of the Chief Procurement Officer
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-30
... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5561-D-02] Order of Succession for the...: Notice of Order of Succession. SUMMARY: In this notice, the Chief Procurement Officer designates the Order of Succession for the Office of the Chief Procurement Officer. DATES: Effective Date: August 19...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-11
... redesignated as 901.103 to conform to the FAR. It also is revised to add ``Senior'' before ``Procurement Executive'' and to clarify that there are two Senior Procurement Executives, one for the National Nuclear... Procurement Executive from the Administrator of the NNSA, and update citation references to the United States...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
... the subject line of the message. Mail to: U.S. Department of Energy, Office of Procurement and.... It also is revised to add ``Senior'' before ``Procurement Executive'' and to clarify that there are two Senior Procurement Executives, one for the National Nuclear Security Administration (NNSA) and the...
Report on the Audit of the Procurement of the Combined Arms Training-Integrated Evaluation System
1990-05-23
This is our final report on the Audit of the Procurement of the Combined Arms Training-Integrated Evaluation System (CATIES). We made the audit from...January through September 1989 in response to a Hotline complaint alleging irregularities in the procurement of CATIES. The audit objectives were to
48 CFR 926.7003 - Review of the procurement request.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7003 Review of the procurement request. Any Energy Policy Act procurement, including basic... potential for making Energy Policy Act awards. [60 FR 22300, May 5, 1995, as amended at 61 FR 21977, May 13...
48 CFR 926.7003 - Review of the procurement request.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7003 Review of the procurement request. Any Energy Policy Act procurement, including basic... potential for making Energy Policy Act awards. [60 FR 22300, May 5, 1995, as amended at 61 FR 21977, May 13...
48 CFR 926.7003 - Review of the procurement request.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7003 Review of the procurement request. Any Energy Policy Act procurement, including basic... potential for making Energy Policy Act awards. [60 FR 22300, May 5, 1995, as amended at 61 FR 21977, May 13...
48 CFR 926.7004 - Size standard for Energy Policy Act procurements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Policy Act of 1992 926.7004 Size standard for Energy Policy Act procurements. The size standard for Energy Policy Act engineering services procurements (SIC 8711) shall be the size standard specified for... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Size standard for Energy...
48 CFR 926.7003 - Review of the procurement request.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7003 Review of the procurement request. Any Energy Policy Act procurement, including basic... potential for making Energy Policy Act awards. [60 FR 22300, May 5, 1995, as amended at 61 FR 21977, May 13...
48 CFR 926.7003 - Review of the procurement request.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7003 Review of the procurement request. Any Energy Policy Act procurement, including basic... potential for making Energy Policy Act awards. [60 FR 22300, May 5, 1995, as amended at 61 FR 21977, May 13...
Systems Analysis Directorate Activities Summary August 1977
1977-09-01
are: x a. Cataloging direction b. Requirements computation c. Procurement direction d. Distribution management e. Disposal direction f...34inventory management," as a responsibility of NICP’s, includes cataloging, requirements computation, procurement direction, distribution management , maintenance...functions are cataloging, major item management, secondary item management, procurement direction, distribution management , overhaul and rebuild
48 CFR 227.7011 - Procurement of rights in inventions, patents, and copyrights.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the Government's interest to do so and the desired rights can be obtained at a fair price. The... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Procurement of rights in... COPYRIGHTS Infringement Claims, Licenses, and Assignments 227.7011 Procurement of rights in inventions...
1985-10-01
significant contributions to eliminating obstacles in production and business , stimulating the development of production, intensifying procurements in...views or attitudes of the U.S. Government. PROCUREMENT OF PUBLICATIONS JPRS publications may be ordered from the National Technical Information...Washington, D.C. 20402. Correspondence pertaining to matters other than procurement may be addressed to Joint Publications Research Service, 1000
Remote sensing procurement package: A technical guide for state and local governments
NASA Technical Reports Server (NTRS)
1981-01-01
The guide provides the tools and techniques for procuring remote sensing products and services. It is written for administrators, procurement officials and line agency staff who are directly involved in identifying information needs; defining remote sensing project requirements; soliciting and evaluating contract responses and negotiating, awarding, and administering contracts.
48 CFR 504.605-70 - Federal Procurement Data System-Public access to data.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Procurement Data System—Public access to data. (a) The FPDS database. The General Services Administration awarded a contract for creation and operation of the Federal Procurement Data System (FPDS) database. That database includes information reported by departments and agencies as required by FAR subpart 4.6. One of...
48 CFR 504.605-70 - Federal Procurement Data System-Public access to data.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Procurement Data System—Public access to data. (a) The FPDS database. The General Services Administration awarded a contract for creation and operation of the Federal Procurement Data System (FPDS) database. That database includes information reported by departments and agencies as required by FAR subpart 4.6. One of...
48 CFR 504.605-70 - Federal Procurement Data System-Public access to data.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Procurement Data System—Public access to data. (a) The FPDS database. The General Services Administration awarded a contract for creation and operation of the Federal Procurement Data System (FPDS) database. That database includes information reported by departments and agencies as required by FAR subpart 4.6. One of...
41 CFR 105-68.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are any procurement contracts included as covered transactions? 105-68.220 Section 105-68.220 Public Contracts and Property...) Covered Transactions § 105-68.220 Are any procurement contracts included as covered transactions? (a...
41 CFR 105-68.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-01-01
... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Are any procurement contracts included as covered transactions? 105-68.220 Section 105-68.220 Public Contracts and Property...) Covered Transactions § 105-68.220 Are any procurement contracts included as covered transactions? (a...
41 CFR 101-27.206 - Procurement of shelf-life materials.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Procurement of shelf-life materials. 101-27.206 Section 101-27.206 Public Contracts and Property Management Federal Property... MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-27.206 Procurement of shelf-life materials. ...
41 CFR 101-27.206 - Procurement of shelf-life materials.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Procurement of shelf-life materials. 101-27.206 Section 101-27.206 Public Contracts and Property Management Federal Property... MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-27.206 Procurement of shelf-life materials. ...
41 CFR 101-27.206 - Procurement of shelf-life materials.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Procurement of shelf-life materials. 101-27.206 Section 101-27.206 Public Contracts and Property Management Federal Property... MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-27.206 Procurement of shelf-life materials. ...
U.S. Hardwood sawmill log procurement practices
Adrienn Andersch; Iris Montague; Urs Buehlmann; Janice K. Wiedenbeck
2015-01-01
U.S. hardwood sawmill log procurement practices are evolving because of the recent economic recession, market and supply chain shifts, and changing landowner objectives, among other factors. The objective of this study was to characterize the log procurement practices of hardwood sawmills and to characterize the role that log brokers play in supplying the sawmill...
17 CFR 256.01-4 - Construction or service contracts, and centralized procurement accounting.
Code of Federal Regulations, 2010 CFR
2010-04-01
... expenses directly attributable to construction work shall be excluded from the accounting system of the... companies. Cost of goods procured shall be excluded from the accounting system of the service company and... contracts, and centralized procurement accounting. 256.01-4 Section 256.01-4 Commodity and Securities...
ERIC Educational Resources Information Center
Dzeng, Ren-Jye; Lin, Ken-Yu; Wang, Pei-Ru
2014-01-01
Game-based education is a promising method for encouraging student learning. Although learning construction procurement and negotiation require hands-on practice, in most construction management courses at the college level, this subject is taught by using lectures and case studies. In this study, a construction procurement and negotiation game…
31 CFR Appendix C to Part 560 - Eligible Procurement Bodies
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Eligible Procurement Bodies C Appendix C to Part 560 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued..., App. C Appendix C to Part 560—Eligible Procurement Bodies This Appendix C sets forth eligible...
Hurst, David; Sharpe, Sharon; Yeager, Valerie A
We assessed whether administrative preparedness processes that were intended to expedite the acquisition of goods and services during a public health emergency affect estimated procurement and contracting cycle times. We obtained data from 2014-2015 applications to the Hospital Preparedness Program and Public Health Emergency Preparedness (HPP-PHEP) cooperative agreements. We compared the estimated procurement and contracting cycle times of 61 HPP-PHEP awardees that did and did not have certain administrative processes in place. Certain processes, such as statutes allowing for procuring and contracting on the open market, had an effect on reducing the estimated cycle times for obtaining goods and services. Other processes, such as cooperative purchasing agreements, also had an effect on estimated procurement time. For example, awardees with statutes that permitted them to obtain goods and services in the open market had an average procurement cycle time of 6 days; those without such statutes had a cycle time of 17 days ( P = .04). PHEP awardees should consider adopting these or similar processes in an effort to reduce cycle times.
Killing by organ procurement: brain-based death and legal fictions.
Veatch, Robert M
2015-06-01
The dead donor rule (DDR) governs procuring life-prolonging organs. They should be taken only from deceased donors. Miller and Truog have proposed abandoning the rule when patients have decided to forgo life-sustaining treatment and have consented to procurement. Organs could then be procured from living patients, thus killing them by organ procurement. This proposal warrants careful examination. They convincingly argue that current brain or circulatory death pronouncement misidentifies the biologically dead. After arguing convincingly that physicians already cause death by withdrawing treatment, they claim no bright-line differences preclude organ removal from the living. The argument fails for those who accept the double effect doctrine or other grounds for distinguishing forgoing life support from active, intentional killing. If the goal is determining irreversible loss of somatic function, they correctly label current death pronouncement a "legal fiction." Recognizing a second, public policy meaning of the term death provides grounds for maintaining the DDR without jeopardizing procurement. © The Author 2015. Published by Oxford University Press, on behalf of the Journal of Medicine and Philosophy Inc. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.
Challenges in developing e-government for good governance in North Sumatra
NASA Astrophysics Data System (ADS)
Siahaan, AY
2017-01-01
E-government as one form of public administration reform in Indonesia is increasingly related to the pursuance of good governance. This paper examines the relationship between of e-government and good governance by utilizing the case study design on the implementation of e-procurement in North Sumatra. It reveals centrality of local politics and business culture in understanding resistances of both local government officials and local business which creates loopholes’ for the practice of ‘bad governance’ in all phases of e-procurement in North Sumatra province. Data transparency does not equate and guarantee the realization of good governance. Public knowledge and understanding on government decision making processes and accountability (process and policy transparency) are central to achieve good governance through e-procurement. E-procurement system does not automatically change organizational and working culture of the implementers and suppliers. This paper provides insight to the attitude and the perception of private sector engage in e-procurement towards government in implementing e-government. Resistance, digital divide and local politics interrelatedly obstruct the realization of pursuing good governance through e-procurement.
Theodorou, Mamas; Georgiou, Marina; Nikolentzos, Athanasios; Bellali, Thalia
2015-01-01
Hospital procurement is a crucial field for any health care system, not only for economic reasons but also for reasons related to the quality and safety of the services provided. That is why the process of procurement is, in most countries, governed by a strict legal framework and policy mechanisms. This study investigates the problems and inefficiencies associated with the procurement of medical devices in public hospitals in Cyprus and formulates empirically documented proposals for improvement. Using the Delphi method, a group of 38 experts approach the procurement system in Cyprus from different angles, achieving high rates of consensus on 35 different statements on the weaknesses and problems of the current medical device procurement system, as well as presenting proposals and recommendations for improvement. The findings are highly valuable for future policy initiatives in Cyprus in the light of the economic crisis and the expected implementation of the new General Health Insurance System (GeSY), which the Government of the Republic of Cyprus and the Troika has agreed. PMID:26153175
E-Procurement, from Project to Practice: Empirical Evidence from the French Public Sector
NASA Astrophysics Data System (ADS)
Beauvallet, Godefroy; Boughzala, Younès; Assar, Saïd
Public procurement constitutes a significant portion of national PIB in all countries and electronic platforms for supporting public transactions are an important application of e-government. In France, new regulations since 2005 are pushing public and private actors to adopt electronic means for handling all steps of the purchase process in public organisations. Based on quantitative and qualitative surveys made between 2005 and 2008, this chapter presents the general topic of e-procurement and specifically discusses the problem of e-procurement adoption in public institutions in France. The conclusions of these investigations spanning a three years period, are that public e-procurement is constantly progressing, although difficulties related to insufficient technical skills and the complexity of the juridical context hinder seriously its full adoption. They also show that a digital and an organisational divide is appearing between big administrations which have the adequate resources and skills to fully adopt e-procurement, and small administration (i.e. local authorities) which are still reluctant or unable to conduct a purchase in a digital manner.
Nelson, E. A. S.; Bloom, David E.; Mahoney, Richard T.
2014-01-01
Background The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments – both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. Objective To determine realistic targets for VPA and VPB. Methods Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. Findings In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Conclusions Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs. PMID:24586899
Nelson, E A S; Bloom, David E; Mahoney, Richard T
2014-01-01
The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. To determine realistic targets for VPA and VPB. Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs.
Exploring the relationship between planning and procurement in Western U.S. electric utilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carvallo Bodelon, Juan Pablo; Sanstad, Alan H.; Larsen, Peter H.
Integrated resource planning (IRP) is an important regulatory process used in many U.S. states to formulate and evaluate least-cost and risk-assessed portfolios to meet future load requirements for electric utilities. In principle, effective implementation of IRP seeks to assure regulators and the public that utility investment decisions, given uncertainty, are as cost-effective as possible. However, to date, there is no empirical assessment on the effectiveness of IRP implementation. In this analysis, we compare planning, procurement processes and actual decisions for a sample of twelve load serving entities (LSEs) across the Western U. S. from 2003-2014. The 2008/2009 recession provides amore » unique “stress test” to the planning process and offers an excellent opportunity to trace how procurement decisions responded to this largely unforeseen event. In aggregate, there is a general alignment between planned and procured supply-side capacity. However, there are significant differences in the choice of supply-side resources and type of ownership for individual LSEs. We develop case studies for three LSEs and find that subsequent plans differ significantly due to changes in the planning environment and that procurement decisions in some cases are impacted by factors that are not accounted for in the planning process. Our results reveal that a limited amount of information produced during the long-term planning process (e.g., forecasts, methods, and least cost/risk portfolios) are ultimately used during the procurement process, and that the latter process relies extensively on the most recent information available for decision making. These findings suggest that states' IRP rules and regulations mandating long-term planning horizons with the same analytical complexity throughout the planning period may not create useful information for the procurement process. The social value of a long-term planning process that departs from procurement and the balance between transparency and complexity of the planning and procurement processes is an open question.« less
Factors influencing global antiretroviral procurement prices
2009-01-01
Background Antiretroviral medicines (ARVs) are one of the most costly parts of HIV/AIDS treatment. Many countries are struggling to provide universal access to ARVs for all people living with HIV and AIDS. Although substantial price reductions of ARVs have occurred, especially between 2002 and 2008, achieving sustainable access for the next several decades remains a major challenge for most low- and middle-income countries. The objectives of the present study were twofold: first, to analyze global ARV prices between 2005 and 2008 and associated factors, particularly procurement methods and key donor policies on ARV procurement efficiency; second, to discuss the options of procurement processes and policies that should be considered when implementing or reforming access to ARV programs. Methods An ARV-medicines price-analysis was carried out using the Global Price Reporting Mechanism from the World Health Organization. For a selection of 12 ARVs, global median prices and price variation were calculated. Linear regression models for each ARV were used to identify factors that were associated with lower procurement prices. Logistic regression models were used to identify the characteristics of those countries which procure below the highest and lowest direct manufactured costs. Results Three key factors appear to have an influence on a country's ARV prices: (a) whether the product is generic or not; (b) the socioeconomic status of the country; (c) whether the country is a member of the Clinton HIV/AIDS Initiative. Factors which did not influence procurement below the highest direct manufactured costs were HIV prevalence, procurement volume, whether the country belongs to the least developed countries or a focus country of the United States President's Emergency Plan For AIDS Relief. Conclusion One of the principal mechanisms that can help to lower prices for ARV over the next several decades is increasing procurement efficiency. Benchmarking prices could be one useful tool to achieve this. PMID:19922690
Lingg, Myriam; Wyss, Kaspar; Durán-Arenas, Luis
2016-07-08
In organisational theory there is an assumption that knowledge is used effectively in healthcare systems that perform well. Actors in healthcare systems focus on managing knowledge of clinical processes like, for example, clinical decision-making to improve patient care. We know little about connecting that knowledge to administrative processes like high-risk medical device procurement. We analysed knowledge-related factors that influence procurement and clinical procedures for orthopaedic medical devices in Mexico. We based our qualitative study on 48 semi-structured interviews with various stakeholders in Mexico: orthopaedic specialists, government officials, and social security system managers or administrators. We took a knowledge-management related perspective (i) to analyse factors of managing knowledge of clinical procedures, (ii) to assess the role of this knowledge and in relation to procurement of orthopaedic medical devices, and (iii) to determine how to improve the situation. The results of this study are primarily relevant for Mexico but may also give impulsion to other health systems with highly standardized procurement practices. We found that knowledge of clinical procedures in orthopaedics is generated inconsistently and not always efficiently managed. Its support for procuring orthopaedic medical devices is insufficient. Identified deficiencies: leaders who lack guidance and direction and thus use knowledge poorly; failure to share knowledge; insufficiently defined formal structures and processes for collecting information and making it available to actors of health system; lack of strategies to benefit from synergies created by information and knowledge exchange. Many factors are related directly or indirectly to technological aspects, which are insufficiently developed. The content of this manuscript is novel as it analyses knowledge-related factors that influence procurement of orthopaedic medical devices in Mexico. Based on our results we recommend that the procurement mechanism should integrate knowledge from clinical procedures adequately in their decision-making. Without strong guidance, organisational changes, and support by technological solutions to improve the generation and management of knowledge, procurement processes for orthopaedic high-risk medical devices will remain sub-optimal.
Donor conversion and procurement failure: the fate of our potential organ donors.
Branco, Bernardino C; Inaba, Kenji; Lam, Lydia; Salim, Ali; Barmparas, Galinos; Teixeira, Pedro G R; Talving, Peep; Demetriades, Demetrios
2011-02-01
Donor availability remains the primary limiting factor for organ transplantation today. The purpose of this study was to examine the causes of procurement failure amongst potential organ donors. After Institutional Review Board approval, all surgical intensive care unit (SICU) patients admitted to the LAC+USC Medical Center from 01/2006 to 12/2008 who became potential organ donors were identified. Demographics, clinical data, and procurement data were abstracted. In non-donors, the causes of procurement failure were documented. During the 3-year study period, a total of 254 patients were evaluated for organ donation. Mean age was 44.8±18.7 years; 191 (75.2%) were male, 136 (53.5%) were Hispanic, and 148 (58.3%) were trauma patients. Of the 254 patients, 116 (45.7%) were not eligible for donation: 34 had multi-system organ failure, 24 did not progress to brain death and had support withdrawn, 18 had uncontrolled sepsis, 15 had malignancy, 6 had human immunodeficiency virus or hepatitis B or C, and 19 patients had other contraindications to organ donation. Of the remaining 138 eligible patients, 83 (60.2%) did not donate: 56 because the family denied consent, 9 by their own choice. In six, next of kin could not be located, five died because of hemodynamic instability before organ procurement was possible, four had organs that could not be placed, and three had their organs declined by the organ procurement organization. The overall consent rate was 57.5% (n=67). From the 55 donors, 255 organs were procured (yield 4.6 organs/donor). Of all patients screened for organ donation, only a fifth actually donated. Denial of consent was the major potentially preventable cause of procurement failure, whereas hemodynamic instability accounted for only a small percentage of donor losses. With such low conversion rates, the preventable causes of procurement failure warrant further study.
1968-06-01
procurement of 19,000 new rifles and 1.9 million rounds of 5.56mm am:nunition ;Jere requested in the Air Force 1962 budget. The Department of Defense at...the Department of Defense inventories was not desirable. Air Force Histcry of the ARIS Rifle (Mid-1960 tc Yid- 1962 ), undated. Adoption of a .223 caliber...discussions on the Air Force procurement.3/ Final Congressional authorization for the Air Force procurement was granted 15 May 1962 . The 8,500 rifles
Use of commercial grade item dedication to reduce procurement costs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rosch, F.
1995-09-01
In the mid-1980s, the Nuclear Regulatory Industry (NRC) began inspecting utility practices of procuring and dedicating commercial grade items intended for plant safety-related applications. As a result of the industry efforts to address NRC concerns, nuclear utilities have enhanced existing programs and procedures for dedication of commercial grade items. Though these programs were originally enhanced to meet NRC concerns, utilities have discovered that the dedication of commercial grade items can also reduce overall procurement costs. This paper will discuss the enhancement of utility dedication programs and demonstrates how utilities have utilized them to reduce procurement costs.
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
2017-03-21
the 75th and 76th ships in the class. The 10 DDG-51s programmed for procurement in FY2013-FY2017 (in annual quantities of 3-1-2-2-2) are being...procured under the 10- ship MYP contract for FY2013-FY2017. The Navy, in its budget submission, notes this additional $1 billion in funding for the DDG...two DDG-51s requested for procurement in FY2017 at $3,393.9 million. The ships have received a total of $182.6 million in prior-year advance procurement
A Framework for Usability Evaluation in EHR Procurement.
Tyllinen, Mari; Kaipio, Johanna; Lääveri, Tinja
2018-01-01
Usability should be considered already by the procuring organizations when selecting future systems. In this paper, we present a framework for usability evaluation during electronic health record (EHR) system procurement. We describe the objectives of the evaluation, the procedure, selected usability attributes and the evaluation methods to measure them. We also present the emphasis usability had in the selection process. We do not elaborate on the details of the results, the application of methods or gathering of data. Instead we focus on the components of the framework to inform and give an example to other similar procurement projects.
Procurement engineering - the productivity factor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bargerstock, S.B.
1993-01-01
The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment.more » Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station.« less
An evaluation of transit procurement training.
Noland, Robert B; Weiner, Marc D; Klein, Nicholas J; Puniello, Orin D
2017-04-01
We evaluated a training course called "Orientation to Transit Procurement", designed and conducted by the National Transit Institute. This course is designed to provide Federal Transit Administration (FTA) grantees an overview of regulations and best practices related to the procurement process. Our objective in conducting the evaluation was to understand how transit agency staff made changes in procurement practices in response to the course training. The evaluation was mixed mode: an Internet survey followed by in-depth interviews with a small group of respondents. Survey respondents were also provided with an open-ended question providing us with additional context for our evaluation. Results show that the training is substantially successful at meeting the goal of improving procurement practices at transit agencies; indeed, most respondents report making changes at their agencies as the proximate result of the training. This was at odds with our exploration of knowledge of procurement topics, as most respondents gave inaccurate answers on multiple-choice "knowledge questions". This may have been due to question structure or, more likely, the nature of online surveys. Suitable training on the procurement of information technology was also a main concern. The lack of training in this area is indicative of the broader challenge facing public transit agencies in how to incorporate new forms of technology into their existing practices and bureaucratic structures. Copyright © 2016 Elsevier Ltd. All rights reserved.
Smith, Zaneta; Leslie, Gavin; Wynaden, Dianne
2015-12-01
Perioperative nurses play a vital role in assisting in surgical procedures for multiorgan procurement, receiving little education apart from on-the-job experiential learning when they are asked to participate in these procedures. Within an Australian context and as part of a larger study, this article describes issues that hindered perioperative nurses' participatory experiences as a result of lacking education, previous exposure, and preparation for assisting in surgical procedures for organ procurement. The grounded theory method was used to develop a substantive theory of perioperative nurses' experiences of participating in surgical procedures for multiorgan procurement. Thirty-five perioperative nurses who had experience in surgical procedures for organ procurement from regional, rural, and metropolitan hospitals of 2 Australian states, New South Wales and Western Australia, participated in the research. Levels of knowledge and experience emerged from the data as an influencing condition and was reported to affect the perioperative nurses' participatory experiences when assisting in procurement surgical procedures. Six components of levels of knowledge and experience were identified and are described. The findings from this study provide a unique contribution to the existing literature by providing an in-depth understanding of the educational needs of perioperative nurses in order to assist successfully in multiorgan procurement procedures. These findings could guide further research with implications for clinical initiatives or education programs specifically targeting the perioperative nursing profession both locally and internationally.
The organization of organ procurement.
Prottas, J M
1989-01-01
The American organ procurement system has improved and matured in the last five years. At the same time, the basic challenges facing it have remained substantially the same because the moral and legal framework of the system has not changed. Success at organ procurement continues to depend on the voluntary cooperation of medical professionals and the families of potential organ donors. The generosity of the American public is so great that the primary challenge facing organ procurement agencies is obtaining cooperation from hospitals and medical professionals. This calls for a "marketing" orientation aimed at those hospitals and professionals who are most likely to treat potential donors. The last five years have seen a more general acceptance of this appreciation of the central task of organ procurement. As a result, the overall effectiveness of the system has improved, as measured by the number of organs procured on a per capita basis and by the number of multiorgan donors obtained. Much of this improvement can be attributed to the diffusion of organizational techniques and approaches, and this diffusion has been encouraged by the involvement of national organizations and public bodies in the organ procurement community. The system remains uneven in its effectiveness and further improvement is possible. It is also possible that the next general round of improvement will result from the application of businesslike information management and marketing techniques.
13 CFR 124.513 - Under what circumstances can a joint venture be awarded an 8(a) contract?
Code of Federal Regulations, 2010 CFR
2010-01-01
...; and (ii)(A) For a procurement having a revenue-based size standard, the procurement exceeds half the... an employee-based size standard, the procurement exceeds $10 million; (2) For sole source and... the purpose of performing one or more specific 8(a) contracts. (2) A joint venture agreement is...
2 CFR 180.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Are any procurement contracts included as... contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts awarded by non... expected to equal or exceed $25,000. (2) The contract requires the consent of an official of a Federal...
29 CFR 95.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 1 2010-07-01 2010-07-01 true Cost and price analysis. 95.45 Section 95.45 Labor Office of... Procurement Standards § 95.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...
9 CFR 2.132 - Procurement of dogs, cats, and other animals; dealers.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Procurement of dogs, cats, and other... SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Miscellaneous § 2.132 Procurement of dogs, cats, and other animals; dealers. (a) A class “B” dealer may obtain live random source dogs and cats...
9 CFR 2.132 - Procurement of dogs, cats, and other animals; dealers.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Procurement of dogs, cats, and other... SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Miscellaneous § 2.132 Procurement of dogs, cats, and other animals; dealers. (a) A class “B” dealer may obtain live random source dogs and cats...
9 CFR 2.132 - Procurement of dogs, cats, and other animals; dealers.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Procurement of dogs, cats, and other... SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Miscellaneous § 2.132 Procurement of dogs, cats, and other animals; dealers. (a) A class “B” dealer may obtain live random source dogs and cats...
32 CFR 644.104 - Procurement of deed and title assembly.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 4 2013-07-01 2013-07-01 false Procurement of deed and title assembly. 644.104... Procurement of deed and title assembly. In any case in which the Court determines that the United States has... Division, Department of Justice. The title assembly and final title opinion should be forwarded to HQDA...
32 CFR 644.104 - Procurement of deed and title assembly.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 4 2014-07-01 2013-07-01 true Procurement of deed and title assembly. 644.104... Procurement of deed and title assembly. In any case in which the Court determines that the United States has... Division, Department of Justice. The title assembly and final title opinion should be forwarded to HQDA...
32 CFR 644.104 - Procurement of deed and title assembly.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 4 2012-07-01 2011-07-01 true Procurement of deed and title assembly. 644.104... Procurement of deed and title assembly. In any case in which the Court determines that the United States has... Division, Department of Justice. The title assembly and final title opinion should be forwarded to HQDA...
32 CFR 644.104 - Procurement of deed and title assembly.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 4 2011-07-01 2011-07-01 false Procurement of deed and title assembly. 644.104... Procurement of deed and title assembly. In any case in which the Court determines that the United States has... Division, Department of Justice. The title assembly and final title opinion should be forwarded to HQDA...
32 CFR 644.104 - Procurement of deed and title assembly.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 4 2010-07-01 2010-07-01 true Procurement of deed and title assembly. 644.104... Procurement of deed and title assembly. In any case in which the Court determines that the United States has... Division, Department of Justice. The title assembly and final title opinion should be forwarded to HQDA...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 2 2013-04-01 2013-04-01 false When procuring property or services with self-determination contract funds, can an Indian tribe or tribal organization follow the same procurement policies and procedures applicable to other Indian tribe or tribal organization funds? 900.47 Section 900.47...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 2 2011-04-01 2011-04-01 false When procuring property or services with self-determination contract funds, can an Indian tribe or tribal organization follow the same procurement policies and procedures applicable to other Indian tribe or tribal organization funds? 900.47 Section 900.47...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 2 2014-04-01 2014-04-01 false When procuring property or services with self-determination contract funds, can an Indian tribe or tribal organization follow the same procurement policies and procedures applicable to other Indian tribe or tribal organization funds? 900.47 Section 900.47...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false When procuring property or services with self-determination contract funds, can an Indian tribe or tribal organization follow the same procurement policies and procedures applicable to other Indian tribe or tribal organization funds? 900.47 Section 900.47...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 2 2012-04-01 2012-04-01 false When procuring property or services with self-determination contract funds, can an Indian tribe or tribal organization follow the same procurement policies and procedures applicable to other Indian tribe or tribal organization funds? 900.47 Section 900.47...
9 CFR 2.132 - Procurement of dogs, cats, and other animals; dealers.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Procurement of dogs, cats, and other... SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Miscellaneous § 2.132 Procurement of dogs, cats, and other animals; dealers. (a) A class “B” dealer may obtain live random source dogs and cats...
44 CFR 150.6 - Design and procurement of awards.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Design and procurement of awards. 150.6 Section 150.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY FIRE PREVENTION AND CONTROL PUBLIC SAFETY AWARDS TO PUBLIC SAFETY OFFICERS § 150.6 Design and procurement of awards. (a...
44 CFR 150.6 - Design and procurement of awards.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Design and procurement of awards. 150.6 Section 150.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY FIRE PREVENTION AND CONTROL PUBLIC SAFETY AWARDS TO PUBLIC SAFETY OFFICERS § 150.6 Design and procurement of awards. (a...
44 CFR 150.6 - Design and procurement of awards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Design and procurement of awards. 150.6 Section 150.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY FIRE PREVENTION AND CONTROL PUBLIC SAFETY AWARDS TO PUBLIC SAFETY OFFICERS § 150.6 Design and procurement of awards. (a...
78 FR 37697 - Federal Acquisition Regulation; Technical Amendments
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-21
... changes to the FAR. List of Subject in 48 CFR Parts 8 and 52 Government procurement. Dated: June 13, 2013... SERVICES 0 2. Amend section 8.703 by revising the third sentence to read as follows: 8.703 Procurement list. * * * Questions concerning whether a supply item or service is on the Procurement List may be submitted at...
40 CFR 35.4205 - How does my group procure a technical advisor or any other contractor?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false How does my group procure a technical... PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4205 How does my group...
A Technical Description of the Officer Procurement Model (TOPOPS). Final Report.
ERIC Educational Resources Information Center
Akman, Allan; And Others
The Total Objective Plan for the Officer Procurement System (TOPOPS) is an aggregate-level, computer-based model of the Air Force Officer procurement system developed to operate on the UNIVAC 1108 system. It is designed to simulate officer accession and training and achieve optimal solutions in terms of either cost minimization or accession…
Code of Federal Regulations, 2010 CFR
2010-10-01
... 27 of the Office of Federal Procurement Policy Act (the Procurement Integrity Act) (41 U.S.C. 423... approved by the senior procurement executive of the agency, unless a law establishes a higher level of... bribe or gratuity is prohibited by 18 U.S.C. 201 and 10 U.S.C. 2207. The acceptance of a gift, under...
A Conceptual View of the Officer Procurement Model (TOPOPS). Technical Report No. 73-73.
ERIC Educational Resources Information Center
Akman, Allan; Nordhauser, Fred
This report presents the conceptual design of a computer-based linear programing model of the Air Force officer procurement system called TOPOPS. The TOPOPS model is an aggregate model which simulates officer accession and training and is directed at optimizing officer procurement in terms of either minimizing cost or maximizing accession quality…
Code of Federal Regulations, 2010 CFR
2010-04-01
... Actions by the United States § 301.7456-1 Administration of oaths and procurement of testimony; production... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Administration of oaths and procurement of testimony; production of records of foreign corporations, foreign trusts or estates and nonresident alien...
21 CFR 1303.12 - Procurement quotas.
Code of Federal Regulations, 2011 CFR
2011-04-01
... purposes of manufacturing, shall apply on DEA Form 250 for a procurement quota for such basic class. A... specified unit of the second basic class. DEA Form 250 shall be filed on or before April 1 of the year preceding the calendar year for which the procurement quota is being applied. Copies of DEA Form 250 may be...
9 CFR 2.132 - Procurement of dogs, cats, and other animals; dealers.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Procurement of dogs, cats, and other... SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Miscellaneous § 2.132 Procurement of dogs, cats, and other animals; dealers. (a) A class “B” dealer may obtain live random source dogs and cats...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Short selection process for procurements not to exceed the simplified acquisition threshold. 736.602-5 Section 736.602-5... selection process for procurements not to exceed the simplified acquisition threshold. References to FAR 36...
NASA's Electronic Procurement System and the Impact on Small Business
NASA Technical Reports Server (NTRS)
Dozier, Ken
1998-01-01
Three workshops, held in Lancaster, Orange County and Compton, were produced by the Los Angeles Regional Technology Alliance (LARTA) and NASA Far West Technology Transfer Center (FWRTTC). The workshops were held on December 12, 1997, February 5, 1998, and March 30, 1998, respectively. The purpose behind these workshops was to spread information regarding NASA procurement opportunities to small businesses in the region. This was accomplished by inviting economic and business development organizations to the three workshops, presenting NASA procurement resources to them, and asking them to distribute this information to the small businesses in their communities. With the assistance of LARTA, marketing and publicity in the form of direct mail, telemarketing, and promotion via a web site was implemented to publicize the workshops. These methods were remarkably effective because they enabled the workshops to attain its full capacity. Further publicity was provided by Wendy Reed of Valley Focus Magazine, an Antelope Valley Magazine aimed at business people. Her article entitled, "Doing Business with the Government" recapped the Lancaster workshop that she had attended and made references to several presentations. In the article, she discussed selling to the government via electronic commerce, and specifically mentioned Robert Medina, the NASA Dryden Small Business Specialist, as a contact person for those interested in pursuing procurement opportunities. The feedback provided by the participants is illustrated by the enclosed graphs and charts. These figures represent the number of participants who have frequented web sites presented at workshops, specifically the NASA procurement resources, and how extensive information dissemination was. Input from participants was favorable and encouraged more NASA Dryden workshops directly to the small business communities. There was an overwhelming response to the benefit of the NASA procurement opportunities presented at the workshops. Ninety-nine percent of participants who responded to surveys expressed that the NASA procurement information was beneficial. By the fifth month after the start of the workshops, NASA procurement resource inquiries peaked at 100%. Also during this time, 100% of respondents to a survey mentioned that they had passed along information from workshops to other small businesses or organizations that could benefit from it. These results indicate successful implementation of the Dryden Workshops. The objective of spreading NASA procurement opportunities throughout small businesses in the region was achieved through the three workshops. In conclusion, we recommend that further NASA procurement workshops be funded to continue the education and outreach that has been started. We also feel that in addition to targeting economic development service providers, Dryden procurement should also be provided directly to small business communities.
Hsu, Ya-Chi; Jerng, Jih-Shuin; Chang, Ching-Wen; Chen, Li-Chin; Hsieh, Ming-Yuan; Huang, Szu-Fen; Liu, Yueh-Ping; Hung, Kuan-Yu
2014-08-11
The process involved in organ procurement and transplantation is very complex that requires multidisciplinary coordination and teamwork. To prevent error during the processes, teamwork education and training might play an important role. We wished to evaluate the efficacy of implementing a Team Resource Management (TRM) program on patient safety and the behaviors of the team members involving in the process. We implemented a TRM training program for the organ procurement and transplantation team members of the National Taiwan University Hospital (NTUH), a teaching medical center in Taiwan. This 15-month intervention included TRM education and training courses for the healthcare workers, focused group skill training for the procurement and transplantation team members, video demonstration and training, and case reviews with feedbacks. Teamwork culture was evaluated and all procurement and transplantation cases were reviewed to evaluate the application of TRM skills during the actual processes. During the intervention period, a total of 34 staff members participated the program, and 67 cases of transplantations were performed. Teamwork framework concept was the most prominent dimension that showed improvement from the participants for training. The team members showed a variety of teamwork behaviors during the process of procurement and transplantation during the intervention period. Of note, there were two potential donors with a positive HIV result, for which the procurement processed was timely and successfully terminated by the team. None of the recipients was transplanted with an infected organ. No error in communication or patient identification was noted during review of the case records. Implementation of a Team Resource Management program improves the teamwork culture as well as patient safety in organ procurement and transplantation.
Wells, Christopher J.; Alano, Abraham
2013-01-01
Introduction Risky sexual behavior among Ethiopian university students, especially females, is a major contributor to young adult morbidity and mortality. Ambaw et al. found that female university students in Ethiopia may fear the humiliation associated with procuring condoms. A study in Thailand suggests condom machines may provide comfortable condom procurement, but the relevance to a high-risk African context is unknown. The objective of this study was to examine if the installation of condom machines in Ethiopia predicts changes in student condom uptake and use, as well as changes in procurement related stigma. Methods Students at a large urban university in Southern Ethiopia completed self reported surveys in 2010 (N = 2,155 surveys) and again in 2011 (N = 2,000), six months after the installation of condom machines. Mann-Whitney and Chi-square tests were conducted to evaluate significant changes in student sexual behavior, as well as condom procurement and associated stigma over the subsequent one year period. Results After installing condom machines, the average number of trips made to procure condoms on-campus significantly increased 101% for sexually active females and significantly decreased 36% for sexually active males. Additionally, reports of condom use during last sexual intercourse showed a non-significant 4.3% increase for females and a significant 9.0% increase for males. During this time, comfort procuring condoms and ability to convince sexual partners to use condoms were significantly higher for sexually active male students. There was no evidence that the condom machines led to an increase in promiscuity. Conclusions The results suggest that condom machines may be associated with more condom procurement among vulnerable female students in Ethiopia and could be an important component of a comprehensive university health policy. PMID:23565272
Abandon the dead donor rule or change the definition of death?
Veatch, Robert M
2004-09-01
Research by Siminoff and colleagues reveals that many lay people in Ohio classify legally living persons in irreversible coma or persistent vegetative state (PVS) as dead that additional respondents, although classifying such patients as living, would be willing to procure organs from them. This paper analyzes possible implications of these findings for public policy. A majority would procure organs from those in irreversible coma or in PVS. Two strategies for legitimizing such procurement are suggested. One strategy would be to make exceptions to the dead donor rule permitting procurement from those in PVS or at least those who are in irreversible coma while continuing to classify them as living. Another strategy would be to further amend the definition of death to classify one or both groups as deceased, thus permitting procurement without violation of the dead donor rule. Permitting exceptions to the dead donor rule would require substantial changes in law--such as authorizing procuring surgeons to end the lives of patients by means of organ procurement--and would weaken societal prohibitions on killing. The paper suggests that it would be easier and less controversial to further amend the definition of death to classify those in irreversible coma and PVS as dead. Incorporation of a conscience clause to permit those whose religious or philosophical convictions support whole-brain or cardiac-based death pronouncement would avoid violating their beliefs while causing no more than minimal social problems. The paper questions whether those who would support an exception to the dead donor rule in these cases and those who would support a further amendment to the definition of death could reach agreement to adopt a public policy permitting organ procurement of those in irreversible coma or PVS when proper consent is obtained.
2014-01-01
Background The process involved in organ procurement and transplantation is very complex that requires multidisciplinary coordination and teamwork. To prevent error during the processes, teamwork education and training might play an important role. We wished to evaluate the efficacy of implementing a Team Resource Management (TRM) program on patient safety and the behaviors of the team members involving in the process. Methods We implemented a TRM training program for the organ procurement and transplantation team members of the National Taiwan University Hospital (NTUH), a teaching medical center in Taiwan. This 15-month intervention included TRM education and training courses for the healthcare workers, focused group skill training for the procurement and transplantation team members, video demonstration and training, and case reviews with feedbacks. Teamwork culture was evaluated and all procurement and transplantation cases were reviewed to evaluate the application of TRM skills during the actual processes. Results During the intervention period, a total of 34 staff members participated the program, and 67 cases of transplantations were performed. Teamwork framework concept was the most prominent dimension that showed improvement from the participants for training. The team members showed a variety of teamwork behaviors during the process of procurement and transplantation during the intervention period. Of note, there were two potential donors with a positive HIV result, for which the procurement processed was timely and successfully terminated by the team. None of the recipients was transplanted with an infected organ. No error in communication or patient identification was noted during review of the case records. Conclusion Implementation of a Team Resource Management program improves the teamwork culture as well as patient safety in organ procurement and transplantation. PMID:25115403
Rethinking health sector procurement as developmental linkages in East Africa.
Mackintosh, Maureen; Tibandebage, Paula; Karimi Njeru, Mercy; Kariuki Kungu, Joan; Israel, Caroline; Mujinja, Phares G M
2018-03-01
Health care forms a large economic sector in all countries, and procurement of medicines and other essential commodities necessarily creates economic linkages between a country's health sector and local and international industrial development. These procurement processes may be positive or negative in their effects on populations' access to appropriate treatment and on local industrial development, yet procurement in low and middle income countries (LMICs) remains under-studied: generally analysed, when addressed at all, as a public sector technical and organisational challenge rather than a social and economic element of health system governance shaping its links to the wider economy. This article uses fieldwork in Tanzania and Kenya in 2012-15 to analyse procurement of essential medicines and supplies as a governance process for the health system and its industrial links, drawing on aspects of global value chain theory. We describe procurement work processes as experienced by front line staff in public, faith-based and private sectors, linking these experiences to wholesale funding sources and purchasing practices, and examining their implications for medicines access and for local industrial development within these East African countries. We show that in a context of poor access to reliable medicines, extensive reliance on private medicines purchase, and increasing globalisation of procurement systems, domestic linkages between health and industrial sectors have been weakened, especially in Tanzania. We argue in consequence for a more developmental perspective on health sector procurement design, including closer policy attention to strengthening vertical and horizontal relational working within local health-industry value chains, in the interests of both wider access to treatment and improved industrial development in Africa. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.
[Posthumous sperm procurement and use--ethical and legal dilemmas].
Crha, I; Dostál, J; Ventruba, P; Kudela, M; Záková, J
2004-07-01
To present a review of bioethical discussion and recommendations concerning posthumous sperm procurement and postmortem parenthood. Review article. Department of Obstetrics and Gynecology, Masaryk University, Brno, Department of Obstetrics and Gynecology, Palacky University, Olomouc. Literature search in Database of Abstracts of Reviews of the Evidence (DARE) and MEDLINEplus. Posthumous sperm procurement and cryopreservation must be performed within 36 hours after death. To established appropriate medical practice, it is important to consider all stakeholders in the decision-making process: the deceased, the requesting party, the child, the physician and the society. There are only few legislative measures concerning postmortem parenthood and posthumous sperm procurement. The essential elements for postmortem reproduction are: judicial order, ethics committee approval, bereavement period of at least 6 month before use. Posthumous sperm procurement is fraught with ethical and legal implications. All stakeholder should be considered. Society for reproductive medicine should prepare acceptable standard protocol.
Lives and choices, give and take: Altruism and organ procurement.
Thornton, Vicky
2017-01-01
In 2015, Wales introduced a deemed consent: soft opt-out system for organ procurement in order to address the chronic shortage of organs for transplant. Early statistical evidence suggests that this has had a positive impact on cadaveric organ donation. Such a system for procurement has previously been dismissed by the Organ Donation Taskforce, who suggested that opting out could potentially undermine the concept of donated organs as gifts and this could then negatively impact the number of organs offered for transplant. Considerable weight was placed upon the need to retain the altruistic gift element associated with an opt-in system. This article will consider the role of altruism in an organ procurement policy. A broad utilitarian approach will be taken when putting forward the arguments in favour of adopting a weak altruism position in a soft opt-out system for procurement with a combined registry.
Remote sensing procurement package: A management report for state and local governments
NASA Technical Reports Server (NTRS)
1981-01-01
An overview of the remote sensing procurement process is presented for chief executives, senior administrators, and other local and state officials responsible for purchasing remote sensing products, services, or equipment. Guidelines are provided for planning, organizing, staffing, and implementing such a procurement project. Other sections of the four-volume package are described and their benefits examined.
75 FR 54560 - Federal Acquisition Regulation; Clarification of Standard Form 26-Award/Contract
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... changes will not prohibit the use of the SF 26 for awarding negotiated procurements; it will only prohibit... Budget under 44 U.S.C. chapter 35, et seq. List of Subjects in 48 CFR Part 53 Government procurement... be used when awarding a negotiated procurement and should only be checked when awarding a sealed-bid...
Code of Federal Regulations, 2010 CFR
2010-01-01
... procurement having a revenue-based size standard, the procurement exceeds half the size standard corresponding to the NAICS code assigned to the contract; and (ii) For a procurement having an employee-based size... for the purpose of submitting an offer for a HUBZone contract. The joint venture itself need not be...
A Handbook for Automatic Data Processing Equipment Acquisition.
1981-12-01
Navy ADPE Procurement Policies (Automatic Data Processing Equipment (ADPE) procurement by federal agencies is governed by an interlocking network of...ADPE) procurement by federal agencies is governed by an interlocking network of policies and directives issued by federal agencies, the Department...SECNAVINST) and local procedures governing the acquisition of ADPE. Obtaining and understanding this interlocking network of policies is often difficult
Code of Federal Regulations, 2010 CFR
2010-01-01
... as provided in paragraph (c)(2) of this section, adverse impact does not apply to “new” requirements. A new requirement is one which has not been previously procured by the relevant procuring activity. (A) Where a requirement is new, no small business could have previously performed the requirement and...
Contracting Processes, Internal Controls, and Procurement Fraud: A Knowledge Assessment
2015-04-30
ååì~ä=^Åèìáëáíáçå= oÉëÉ~êÅÜ=póãéçëáìã= qÜìêëÇ~ó=pÉëëáçåë= sçäìãÉ=ff= = Contracting Processes, Internal Controls, and Procurement Fraud: A Knowledge...DATES COVERED 00-00-2015 to 00-00-2015 4. TITLE AND SUBTITLE Contracting Processes, Internal Controls, and Procurement Fraud: A Knowledge...capable processes, and effective internal controls result in the DoD having a higher level of vulnerability for procurement fraud (Rendon & Rendon, in
Toxic substances alert program
NASA Technical Reports Server (NTRS)
Junod, T. L.
1978-01-01
A toxicity profile is provided, of 187 toxic substances procured by NASA Lewis Research Center during a 3 1/2 year period, including 27 known or suspected carcinogens. The goal of the program is to assure that the center's health and safety personnel are aware of the procurement and use of toxic substances and to alert and inform the users of these materials as to the toxic characteristics and the control measures needed to ensure their safe use. The program also provides a continuing record of the toxic substances procured, who procured them, what other toxic substances the user has obtained in the past, and where similar materials have been used elsewhere at the center.
Procuring load curtailment from local customers under uncertainty.
Mijatović, Aleksandar; Moriarty, John; Vogrinc, Jure
2017-08-13
Demand side response (DSR) provides a flexible approach to managing constrained power network assets. This is valuable if future asset utilization is uncertain. However there may be uncertainty over the process of procurement of DSR from customers. In this context we combine probabilistic modelling, simulation and optimization to identify economically optimal procurement policies from heterogeneous customers local to the asset, under chance constraints on the adequacy of the procured DSR. Mathematically this gives rise to a search over permutations, and we provide an illustrative example implementation and case study.This article is part of the themed issue 'Energy management: flexibility, risk and optimization'. © 2017 The Author(s).
Informed consent in posthumous sperm procurement.
Hostiuc, Sorin; Curca, Cristian George
2010-10-01
Assisted reproductive technologies are increasingly more present in our everyday life: from classical sperm/egg donation or in vitro fertilization to newer, more controversial methods such as surrogate motherhood, male pregnancies or posthumous sperm procurement. Every year, new concepts are emerging in this field and the medical world is not always prepared to deal with them. The greatest problem of using posthumous sperm procurement as an assisted reproductive method resides in analyzing consent related. An extensive research of the scientific literature revealed eight possible situations which we will present and analyze in this article. By analyzing consent related issues we present a decision making algorithm for posthumous sperm procurement.
Willging, Cathleen E; Aarons, Gregory A; Trott, Elise M; Green, Amy E; Finn, Natalie; Ehrhart, Mark G; Hecht, Debra B
2016-09-01
Sustainment of evidence-based interventions (EBIs) in human services depends on the inner context of community-based organizations (CBOs) that provide services and the outer context of their broader environment. Increasingly, public officials are experimenting with contracting models from for-profit industries to procure human services. In this case study, we conducted qualitative interviews with key government and CBO stakeholders to examine implementation of the Best Value-Performance Information Procurement System to contract for EBIs in a child welfare system. Findings suggest that stakeholder relationships may be compromised when procurement disregards local knowledge, communication, collaboration, and other factors supporting EBIs and public health initiatives.
Improving organ procurement practices in Michigan
Lynch, RJ; Mathur, AK; Hundley, JC; Kubus, J; Pietroski, RE; Mattice, BJ; Punch, JD; Englesbe, MJ
2015-01-01
Travel to procure deceased donor organs is associated with risk to transplant personnel. In many instances, multiple teams are present for a given operation. We studied our statewide experience to determine how much excess travel this redundancy entails, and generated alternate models for organ recovery. We reviewed our organ procurement organization’s experience with deceased donor operations between 2002 and 2008. Travel was expressed as cumulative person-miles between procurement team origin and donor hospital. A model of minimal travel was created, using thoracic and abdominal teams from the closest in-state center. A second model involved transporting donors to a dedicated procurement facility. Travel distance was recalculated using these models, and mode and cost of travel extrapolated from current practices. In 654 thoracic and 1469 abdominal donors studied, mean travel for thoracic teams was 1066 person-miles, and for abdominal teams was 550 person-miles. The mean distance traveled by thoracic and abdominal organs was 223 miles and 142 miles, respectively. Both hypothetical models showed reductions in team travel and reliance on air transport, with favorable costs and organ transport times compared to historical data. In summary, we found significant inefficiency in current practice, which may be alleviated using new paradigms for donor procurement. PMID:19656129
Public procurement of health technologies in Greece in an era of economic crisis.
Kastanioti, Catherine; Kontodimopoulos, Nick; Stasinopoulos, Dionysis; Kapetaneas, Nikolaos; Polyzos, Nikolaos
2013-01-01
Public procurement is generally an important sector of the economy and, in most countries, is controlled by the introduction of regulatory and policy mechanisms. In the Greek healthcare sector, recent legislation redefined centralized procurement through the reestablishment of a state Health Procurement Committee (EPY), with an aim to formulate a plan to reduce procurement costs of medical devices and pharmaceuticals, improve payment time, make uniform medical requests, transfer redundant materials from one hospital to another and improve management of expired products. The efforts described in this paper began in early 2010, under the co-ordination of the Ministry of Health (MoH) and with the collaboration of senior staff from the International Monetary Fund (IMF), the European Commission (EC) and the European Central Bank (ECB). The procurement practices and policies set forth by EPY and the first measurable outcomes, in terms of cost savings, resulting from these policies are presented. The importance of these measures is discussed in light of the worst economic crisis faced by Greece since the restoration of democracy in 1974, as a result of both the world financial crisis and uncontrolled government spending. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.
de Bucourt, Maximilian; Busse, Reinhard; Güttler, Felix; Wintzer, Christian; Collettini, Federico; Kloeters, Christian; Hamm, Bernd; Teichgräber, Ulf K
2011-08-01
OBJECTIVES: To apply the economic terminology of lean manufacturing and the Toyota Production System to the procurement of vascular stents in interventional radiology. METHODS: The economic- and process-driven terminology of lean manufacturing and the Toyota Production System is first presented, including information and product flow as well as value stream mapping (VSM), and then applied to an interdisciplinary setting of physicians, nurses and technicians from different medical departments to identify wastes in the process of endovascular stent procurement in interventional radiology. RESULTS: Using the so-called seven wastes approach of the Toyota Production System (waste of overproducing, waiting, transport, processing, inventory, motion and waste of defects and spoilage) as well as further waste characteristics (gross waste, process and method waste, and micro waste), wastes in the process of endovascular stent procurement in interventional radiology were identified and eliminated to create an overall smoother process from the procurement as well as from the medical perspective. CONCLUSION: Economic terminology of lean manufacturing and the Toyota Production System, especially VSM, can be used to visualise and better understand processes in the procurement of vascular stents in interventional radiology from an economic point of view.
An analysis of disruptions in aerospace/defense organizations that affect the supply chain
NASA Astrophysics Data System (ADS)
Dickerson, Toscha L.
The purpose of this quantitative study was to determine whether or not functions of procurement organizations structures' and aerospace suppliers were perceived as disruptions and to identify their effects on lead time and costs within a supply chain. An analysis of employees' perception of centralized and decentralized procurement functions, aerospace and defense suppliers, lead times of goods and services, price increases, and schedule delays was conducted. Prior studies are limited in regards to understanding how specific procurement functions affects an organization procurement structure. This non-experimental quantitative study allowed for a survey to be administered to aerospace and defense companies throughout the United States to obtain information from sourcing and procurement professionals with 5 or more years of experience. The current study utilized a 10 question survey based on the 5- point Likert -type scale to determine the findings. Through descriptive and inferential statistics, using regression analysis, standard deviation, and P-value; findings indicated that the majority of the participants surveyed perceived both centralized and decentralized procurement functions affected lead time and cost of goods and services resulted in a positive effect and were considered as supply chain disruptions.
Optimizing Eco-Efficiency Across the Procurement Portfolio.
Pelton, Rylie E O; Li, Mo; Smith, Timothy M; Lyon, Thomas P
2016-06-07
Manufacturing organizations' environmental impacts are often attributable to processes in the firm's upstream supply chain. Environmentally preferable procurement (EPP) and the establishment of environmental purchasing criteria can potentially reduce these indirect impacts. Life-cycle assessment (LCA) can help identify the purchasing criteria that are most effective in reducing environmental impacts. However, the high costs of LCA and the problems associated with the comparability of results have limited efforts to integrate procurement performance with quantitative organizational environmental performance targets. Moreover, environmental purchasing criteria, when implemented, are often established on a product-by-product basis without consideration of other products in the procurement portfolio. We develop an approach that utilizes streamlined LCA methods, together with linear programming, to determine optimal portfolios of product impact-reduction opportunities under budget constraints. The approach is illustrated through a simulated breakfast cereal manufacturing firm procuring grain, containerboard boxes, plastic packaging, electricity, and industrial cleaning solutions. Results suggest that extending EPP decisions and resources to the portfolio level, recently made feasible through the methods illustrated herein, can provide substantially greater CO2e and water-depletion reductions per dollar spend than a product-by-product approach, creating opportunities for procurement organizations to participate in firm-wide environmental impact reduction targets.
Organ procurement after euthanasia: Belgian experience.
Ysebaert, D; Van Beeumen, G; De Greef, K; Squifflet, J P; Detry, O; De Roover, A; Delbouille, M-H; Van Donink, W; Roeyen, G; Chapelle, T; Bosmans, J-L; Van Raemdonck, D; Faymonville, M E; Laureys, S; Lamy, M; Cras, P
2009-03-01
Euthanasia was legalized in Belgium in 2002 for adults under strict conditions. The patient must be in a medically futile condition and of constant and unbearable physical or mental suffering that cannot be alleviated, resulting from a serious and incurable disorder caused by illness or accident. Between 2005 and 2007, 4 patients (3 in Antwerp and 1 in Liège) expressed their will for organ donation after their request for euthanasia was granted. Patients were aged 43 to 50 years and had a debilitating neurologic disease, either after severe cerebrovascular accident or primary progressive multiple sclerosis. Ethical boards requested complete written scenario with informed consent of donor and relatives, clear separation between euthanasia and organ procurement procedure, and all procedures to be performed by senior staff members and nursing staff on a voluntary basis. The euthanasia procedure was performed by three independent physicians in the operating room. After clinical diagnosis of cardiac death, organ procurement was performed by femoral vessel cannulation or quick laparotomy. In 2 patients, the liver, both kidneys, and pancreatic islets (one case) were procured and transplanted; in the other 2 patients, there was additional lung procurement and transplantation. Transplant centers were informed of the nature of the case and the elements of organ procurement. There was primary function of all organs. The involved physicians and transplant teams had the well-discussed opinion that this strong request for organ donation after euthanasia could not be waived. A clear separation between the euthanasia request, the euthanasia procedure, and the organ procurement procedure is necessary.
NASA Astrophysics Data System (ADS)
Ninomiya, Hitoshi; Nanerikawa, Susumu
Public procurement system such as Overall-Evaluation dynamically has been changed on local public works in Japan. However some characteristics of Bidding-Strategy and procurement system have not enough clarified. This paper attempt to analysis for a syatem dynamics and mechanisum of Overall-Evaluation by developing new simulation model focused on Bidding-Strategy, to propose some improvement scenario.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... at FAR 53.215-1(a) to read ``Block 18 may not be used for negotiated procurements.'' This change does... U.S.C. chapter 35, et seq. List of Subjects in 48 CFR Parts 15 and 53 Government procurement. [[Page... negotiated procurement and emphasize that block 18 should only be checked when awarding a sealed bid contract...
Long-Term Implications of the 2016 Future Years Defense Program
2016-01-01
operation and maintenance activities; acquisition includes research, development, test, and evaluation as well as procurement of weapon systems and other...group includes procurement and research, development, test, and evaluation (RDT&E). Appropriations for procurement fund the purchase of new weapon...and Evaluation Military Construction Family Housing OCO Funding Actual FYDP Period Beyond the FYDP PeriodDoD’s Estimates For 2017 through 2020 DoD
2015-12-01
in driving arms procurements in Malaysia , Indonesia, and Singapore: availability of resources, domestic politics, external threats, and force...could incite more frequent excursions toward competitive arms dynamics. 14. SUBJECT TERMS Malaysia , Indonesia, Singapore, Southeast Asia, arms...This thesis investigates the following four factors to determine which are most powerful in driving arms procurements in Malaysia , Indonesia, and
Pros and Cons of International Weapons Procurement Collaboration.
1995-01-01
ad- vanced U.S. industry. Greater risk of cost growth and schedule slippage. Pro: U.S. and partners share common equip- ment. Con : U.S. require...Mark A., 1947- Pros and cons of international weapons procurement collaboration / Mark Lorell, Julia Lowell, p. cm "Prepared for the Office...one/ Cons of International Weapons Procurement Collaboration Mark Lorell Julia Lowell National Defense Research Institute Prepared for the
Government Furnished Property: Management and Accounting.
1986-06-01
PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION I(if applicable) %J 8c ADDRESS (City. State, anid ZIP Code) 10 SOURCE OF FUNDING NUMBERS e...DAR), Armed Services Procurement Regulation (ASPR), GAO aid service comptroller guidelines, and contract administration procedures. D. SCOPE OF STUDY...Contractor-acquired property is property procured or otherwise provided by the contractor for the performance of a . contract, title to which is vested in
Code of Federal Regulations, 2011 CFR
2011-01-01
.... (a) Reservation as small business or SDB set-aside. The procuring activity issued a solicitation for... small disadvantaged business (SDB) set-aside prior to offering the requirement to SBA for award as an 8... the requirement be procured as a small business or, if authorized, an SDB set-aside. [63 FR 35739...
Private Industry Support to Defense Needs.
1982-04-19
especially private industry, must fully understand that defense procurement is changing drastically and it will no longer be looking for all its...products on the leading edge of technology. The price in time and money dictates this changed procure - ment strategy immediately. Private industry would...A process to stablize procurements and breakdown the barriers that are stopping new firms from entering into defense business; private industry
One-year assessment of joint procurement of pharmaceuticals in the public health sector in Jordan.
Al-Abbadi, Ibrahim; Qawwas, Abdelraouf; Jaafreh, Mahmoud; Abosamen, Taher; Saket, Maisa
2009-06-01
About 10% of the gross domestic product in Jordan is spent on health care, and almost one third of that is spent on pharmaceuticals. The public health sector in Jordan has 4 main governmental parties that purchase medicines independently through annual tenders (ie, the process of bidding, being awarded, ordering, paying for, and receiving drugs) issued in the generic (or scientific) name of the medicines or therapeutic groups. Double purchasing is a problem that leads to higher spending on drugs and poor availability of medicines throughout the year. To remedy this problem, a joint procurement process was established in Jordan in 2004 and went into practice in 2006. The aim of this research was to assess the first year of purchasing pharmaceuticals in the public health sector in Jordan through the joint procurement process for the 4 participating parties in comparison with purchasing pharmaceuticals independently before the institution of joint procurement. The first tender under the joint procurement process was issued in 2007 for antibiotics, anti-HIV medications, and antituberculosis agents, which represent 15% of the annual pharmaceutical public-sector purchases in Jordan. A research committee solicited lists of purchased quantities and final purchase prices of these pharmaceuticals obtained in 2006 by each participating group and in 2007 through the joint procurement process. The quantity-comparison method was used to compare the costs of drugs purchased in 2006 and 2007, and estimated cost savings were calculated for each product for each party for 2006 and 2007 under the assumption that the same quantities purchased by each participating party in 2006 would be purchased through joint procurement (prices of 2007). Purchasing through the joint procurement process achieved an estimated savings of 2.4%. This savings increased to 8.9% after excluding 1 item (a cephalosporin), the raw material price of which increased markedly in 2007 compared with 2006 because of an international shortage of raw materials. Based on these initial findings, applying a joint procurement system for pharmaceuticals in the public health sector in Jordan has potential to reduce expenditures for the purchase of medicines and provide treatment continuously throughout the year.
Willging, Cathleen E.; Aarons, Gregory A.; Trott, Elise M.; Green, Amy E.; Finn, Natalie; Ehrhart, Mark G.; Hecht, Debra B.
2016-01-01
Sustainment of evidence-based interventions (EBIs) in human services depends on the inner context of community-based organizations (CBOs) that provide services and the outer context of their broader environment. Increasingly, public officials are experimenting with contracting models from for-profit industries to procure human services. In this case study, we conducted qualitative interviews with key government and CBO stakeholders to examine implementation of the Best Value-Performance Information Procurement System to contract for EBIs in a child welfare system. Findings suggest that stakeholder relationships may be compromised when procurement disregards local knowledge, communication, collaboration, and other factors supporting EBIs and public health initiatives. PMID:26386977
Mechanism Design for Task Procurement with Flexible Quality of Service
NASA Astrophysics Data System (ADS)
Gerding, Enrico H.; Larson, Kate; Rogers, Alex; Jennings, Nicholas R.
In this paper, we consider the problem where an agent wishes to complete a single computational task, but lacks the required resources. Instead, it must contract self-interested service providers, who are able to flexibly manipulate the quality of service they deliver, in order to maximise their own utility. We extend an existing model to allow for multiple such service providers to be contracted for the same task, and derive optimal task procurement mechanisms in the setting where the agent has full knowledge of the cost functions of these service providers (considering both simultaneous and sequential procurement). We then extend these results to the incomplete information setting where the agent must elicit cost information from the service providers, and we characterise a family of incentive-compatible and individually-rational mechanisms. We show empirically that sequential procurement always generates greater utility for the agent compared to simultaneous procurement, and that over a range of settings, contracting multiple providers is preferable to contracting just one.
High profile backing for GS1 drive.
Hodgson, Glen
2016-09-01
At the 2016 GS1 UK Healthcare Conference in London, delegates heard from speakers including Pat Mills, the Department of Health's commercial director, on the ongoing work to embed GS1 standards throughout the NHS in England in line with the DH's eProcurement Strategy, published in April 2014. This mandated that any service or product procured by an English NHS acute Trust comply with the standards--one of the most obvious representations of which is on barcodes--'to enable Trusts to manage their non-pay spending by adopting master procurement data, automating the exchange of such data, and benchmarking their procurement against other Trusts and healthcare providers'. One of six 'demonstrator site' Trusts to provide a speaker at the 2016 GS1 UK national conference to report on their progress to date was Leeds Teaching Hospitals NHS Trust. Shortly after, HEJ editor, Jonathan Baillie, spoke to the Trust's associate director, Commercial and Procurement, Chris Slater, and to head of Healthcare at GS1 UK, Glen Hodgson.
Innovating the Standard Procurement System Utilizing Intelligent Agent Technologies
1999-12-01
36 C. STANDARD PROCUREMENT SYSTEM 36 1. OVERVIEW 36 2. SPS FUNCTIONS , 37 3. SPS ADVANTAGES 39 4. SPS DISADVANTAGES 40 5. SPS SUMMARY 41 D...PROCUREMENT PROCESS INNOVATION RESULTS ’. 52 E. INTELLIGENT AGENT (IA) TECHNOLOGY 53 1. OVERVIEW 54 viii 2. ADVANTAGES 58 3. DISADVANTAGES 58 F...Electronic Mall (EMALL), GSA Advantage , etc. • Web invoicing Electronic Funds Transfer (EFT) • • International Merchant Purchase Authorization Card (IMPAC
Code of Federal Regulations, 2010 CFR
2010-01-01
... conditions of a particular 8(a) contract or a procuring activity decision not to reserve a requirement for...) contract or a procuring activity decision not to reserve a requirement for the 8(a) BD program? (a) What... an 8(a) contract after SBA's acceptance of the requirement for the 8(a) BD program; and (3) The terms...
1987-06-01
37 D ALTERNATIVE vlEwS ...... .............. 37 I E. PROCUREMENT INITIATIVES TO PROFESSIONALIZE THE WORKFORCE... 38 F. PROFESSIONALISM...Procurement Research The objective of this element is to identify sources for completed research, list alternatives for conducting further research, and...year depending on what new program starts occur, however the general pattern is relatively representative through FY1986. With the MLCs coming online in
Use of Commercial ’Off-the-Shelf’ Equipment in Military Aircraft
1976-05-01
never been intended as a procurement document. The airline industry benefits from the standarization of equipment. Aeronautical Radio Inc. (ARINC) is...are not intended for nor are they suitable for use as procurement specifications. 2. Airframe manufacturers and commercial airlines purchase avionics...may be suitable for military procurements but a careful review must be made to ensure that the performance and environmental testing specified is
Code of Federal Regulations, 2014 CFR
2014-01-01
... be identified as an EDWOSB or WOSB in any Federal procurement databases? 127.701 Section 127.701... Federal procurement databases? (a) In order to be identified as an EDWOSB or WOSB in the System for Award Management (SAM) database (or any successor thereto), a concern must certify its EDWOSB or WOSB status in...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false What must a concern do in order to be identified as a SDB in any Federal procurement database? 124.1016 Section 124.1016 Business Credit... procurement database? (a) In order to be identified as a SDB in the System for Award Management (SAM) database...
Performance of the Defense Acquisition System, 2015 Annual report
2015-09-16
Planned Total (From Start to Completion) Quantity-Adjusted Unit -Procurement Recurring-Flyaway Funding (1999–2014) NOTE: This measures biennial...PAUC is a different funding measure define by statute (10 United States Code [U.S.C.], sections 2430a and 2432) consisting of the total acquisition... measures that (unlike PAUC and APUC) are fully adjusted for any changes in procurement quantity. These results help compare procurement unit costs
Market Research: Better Documentation Needed to Inform Future Procurements at Selected Agencies
2014-10-01
MARKET RESEARCH Better Documentation Needed to Inform Future Procurements at Selected Agencies Report to the...currently valid OMB control number. 1. REPORT DATE OCT 2014 2. REPORT TYPE 3. DATES COVERED 00-00-2014 to 00-00-2014 4. TITLE AND SUBTITLE Market ...2014 MARKET RESEARCH Better Documentation Needed to Inform Future Procurements at Selected Agencies is Why GAO Did This Study The federal
ERIC Educational Resources Information Center
General Accounting Office, Washington, DC. Div. of Human Resources.
This document comprises the General Accounting Office's (GAO) report to the House Subcommittee on Intergovernmental Relations concerning the GAO's review of the contract awarding process of the National Institute of Education (NIE) for fiscal year 1983. The review focused on 39 of NIE's 52 newly negotiated procurement contracts; a sample of…
Design and engineering analysis of material procurement mobile operation platform
NASA Astrophysics Data System (ADS)
Ding, H.; Li, J.
2014-03-01
The material procurement mobile operation platform (MPMOP) consists of six modules, including network operation, truck transportation, remote communication, satellite positioning, power supply and environment regulation. The MPMOP is designed to have six major functions, including online procurement, command control, remote communication, satellite positioning, information management and auxiliary decision. The paper implements an engineering analysis on the MPMOP from three aspects, including transportation transfinite, centroid, and power dissipation.
One-on-one care management and procurement of Naloxone for ambulatory use.
Whittington, Richard; Whittington, Kathleen; Whittington, John; Porter, Joel; Zimmermann, Karla; Case, Holly; Berg, Stacey
2018-02-16
Morbidity and mortality from prescription opioids has reached unprecedented levels. Opioids remain part of chronic pain treatment in primary care. This study was designed to determine whether one-on-one care management increases procurement of Naloxone, an opioid antagonist shown to reduce morbidity and mortality in opioid overdoses. Participants included all patients ≥18 years enrolled in a primary care-based chronic pain management program and who were prescribed a daily dose of opioids for treatment of chronic pain. In total, 153 patients chose to participate. Each had a 1 h one-on-one education meeting with a registered nurse. Among the enrolled, eight patients (5.2%) had procured Naloxone prior to intervention. Overall, 31 additional patients (20.2%) procured Naloxone after intervention, a 288% relative improvement in the attainment of Naloxone (P < 0.0001) (χ2 = 29.032 with 1 degree freedom). Of the 114 participants who never procured Naloxone, 69.3% believed it was unnecessary, 20% forgot about Naloxone, 8% said it was cost prohibitive, 3.5% had access concerns and 0.9% had concerns about side effects. Direct one-on-one nurse care management sessions were associated with an increased procurement of Naloxone in a primary care-based pain management program. A significant number of patients believed Naloxone was unnecessary after the intervention.
Beall, Reed F; Kuhn, Randall; Attaran, Amir
2015-03-01
Compulsory licensing has been widely suggested as a legal mechanism for bypassing patents to introduce lower-cost generic antiretrovirals for HIV/AIDS in developing countries. Previous studies found that compulsory licensing can reduce procurement prices for drugs, but it is unknown how the resulting prices compare to procurements through the Global Fund to Fight AIDS, Tuberculosis, and Malaria; UNICEF; and other international channels. For this study we systematically constructed a case-study database of compulsory licensing activity for antiretrovirals and compared compulsory license prices to those in the World Health Organization's (WHO's) Global Price Reporting Mechanism and the Global Fund's Price and Quality Reporting Tool. Thirty compulsory license cases were analyzed with 673 comparable procurements from WHO and Global Fund data. Compulsory license prices exceeded the median international procurement prices in nineteen of the thirty case studies, often with a price gap of more than 25 percent. Compulsory licensing often delivered suboptimal value when compared to the alternative of international procurement, especially when used by low-income countries to manufacture medicines locally. There is an ongoing need for multilateral and charitable actors to work collectively with governments and medicine suppliers on policy options. Project HOPE—The People-to-People Health Foundation, Inc.
Continuous Positive Airway Pressure Device Time to Procurement in a Disadvantaged Population.
DelRosso, Lourdes M; Hoque, Romy; Chesson, Andrew L
2015-01-01
Introduction. The management of obstructive sleep apnea (OSA) in patients who cannot afford a continuous positive airway pressure (CPAP) device is challenging. In this study we compare time to CPAP procurement in three groups of patients diagnosed with OSA: uninsured subsidized by a humanitarian grant (Group 1), uninsured unsubsidized (Group 2), and those with Medicare or Medicaid (Group 3). We evaluate follow-up and adherence in Group 1. We hypothesize that additional factors, rather than just the ability to obtain CPAP, may uniquely affect follow-up and adherence in uninsured patients. Methods. 30 patients were in Groups 1 and 2, respectively. 12 patients were in Group 3. Time of CPAP procurement from OSA diagnosis to CPAP initiation was assessed in all groups. CPAP adherence data was collected for Group 1 patients at 1, 3, 6, and 9 months. Results. There were no significant differences between groups in gender, age, body mass index, or apnea hypopnea index. The mean time to procurement in Group 1 was shorter compared to Group 2 but not significant. Compared to both Group 1 and Group 2, Group 3 patients had significantly shorter times to device procurement. Conclusion. Time to procurement of CPAP was significantly shorter in those with Medicaid/Medicare insurance compared to the uninsured.
Gonçalves, Michele Martins; Leles, Cláudio Rodrigues; Freire, Maria do Carmo Matias
2013-01-01
The objective of this ecological study was to investigate the association between caries experience in 5- and 12-year-old Brazilian children in 2010 and household sugar procurement in 2003 and the effects of exposure to water fluoridation and socioeconomic indicators. Sample units were all 27 Brazilian capital cities. Data were obtained from the National Surveys of Oral Health; the National Household Food Budget Survey; and the United Nations Program for Development. Data analysis included correlation coefficients, exploratory factor analysis, and linear regression. There were significant negative associations between caries experience and procurement of confectionery, fluoridated water, HDI, and per capita income. Procurement of confectionery and soft drinks was positively associated with HDI and per capita income. Exploratory factor analysis grouped the independent variables by reducing highly correlated variables into two uncorrelated component variables that explained 86.1% of total variance. The first component included income, HDI, water fluoridation, and procurement of confectionery, while the second included free sugar and procurement of soft drinks. Multiple regression analysis showed that caries is associated with the first component. Caries experience was associated with better socioeconomic indicators of a city and exposure to fluoridated water, which may affect the impact of sugars on the disease. PMID:24307900
Smith, Alan D; Flanegin, Frank R
2004-01-01
The concepts of automated e-procurement, or electronic B2B (business-to-business) trade, are grounded in the strategic leveraging of both tangible/intangible assets for successful implementation and execution of electronic trade, resulting in significant financial benefits for firms. Some of the major reasons for this growth include significant process savings from automation, compliance, and purchasing advantage; and reduced costs that organisations can experience by conducting transactions electronically. Although these are the basic benefits associated with generic e-commerce strategies, a majority of these B2B transactions have focused on the purchase of indirect materials (especially office products and travel services). In fact, more than 93% of medical supplies on hospital shelves appear to have universal product numbers on them--at least while still in their boxes and there is a great potential for huge savings in e-procurement in the healthcare field. However, other types of supply chain-related purchases, including maintenance, repair, and operating and replacement parts, and direct material purchases, are becoming more important operational management considerations. In addition, several other key considerations are: existing procurement strategy, the vendor, technology, suppliers, and total costs of ownership. Companies need to analyse their current procurement strategy before developing an e-procurement plan.
The transformation of the tender evaluation process in public procurement in Poland
NASA Astrophysics Data System (ADS)
Plebankiewicz, E.; Kozik, R.
2017-10-01
Procedures regarding the evaluation of tenders have been changed since the public procurement law was enacted (it came into force in January 1, 1995). The contracting authority could apply both the criteria related to the qualities of the contractor and those related to the to the subject - matter of public contract. Two extensive amendments in 2001 and a government project introduced vital regulations and excluded the possibility of applying criteria related to the qualities of the contractor. Act of 29 January 2004 Public Procurement Law allowed to use price as the sole contract award criterion. The changes in the Law in 2014 restricted that possibility to the situation in which the subject matter of a contract is commonly available and has established quality standards. The Act of 22 June 2016 amending the Public Procurement Law Act and some other laws introduced the new criteria list and limited the importance of the price criterion in the certain situations. Instead of price, the cost can also be a criterion for tender evaluation. The cost criterion can be determined using life cycle costing. In the paper, based on contract notices of open tendering published in the Public Procurement Bulletin, the criteria of construction contract selection will be analysed. In particular the effectiveness of changes in the Procurement Law will be researched.
Benchmarking in national health service procurement in Scotland.
Walker, Scott; Masson, Ron; Telford, Ronnie; White, David
2007-11-01
The paper reports the results of a study on benchmarking activities undertaken by the procurement organization within the National Health Service (NHS) in Scotland, namely National Procurement (previously Scottish Healthcare Supplies Contracts Branch). NHS performance is of course politically important, and benchmarking is increasingly seen as a means to improve performance, so the study was carried out to determine if the current benchmarking approaches could be enhanced. A review of the benchmarking activities used by the private sector, local government and NHS organizations was carried out to establish a framework of the motivations, benefits, problems and costs associated with benchmarking. This framework was used to carry out the research through case studies and a questionnaire survey of NHS procurement organizations both in Scotland and other parts of the UK. Nine of the 16 Scottish Health Boards surveyed reported carrying out benchmarking during the last three years. The findings of the research were that there were similarities in approaches between local government and NHS Scotland Health, but differences between NHS Scotland and other UK NHS procurement organizations. Benefits were seen as significant and it was recommended that National Procurement should pursue the formation of a benchmarking group with members drawn from NHS Scotland and external benchmarking bodies to establish measures to be used in benchmarking across the whole of NHS Scotland.
Yoshikawa, M; Yoshinaga, K; Imamura, Y; Hayashi, T; Osako, T; Takahashi, K; Kaneko, M; Fujisawa, M; Kamidono, S
2016-09-01
The organ donation rate in Japan is much lower than that in other developed countries for several reasons. An advanced educational program for in-hospital procurement coordinators is a possible solution for this. We introduced a Transplant Procurement Management (TPM) educational program at Hyogo Prefecture, Japan. Ten healthcare professionals at Hyogo Prefecture participated in the Advanced International TPM course to educate themselves on TPM and held 2 TPM Model Organ Procurement Training Workshops at Hyogo Prefecture for in-hospital procurement coordinators. Furthermore, we held 2 workshops outside Hyogo Prefecture and at the same time undertook a pre-workshop questionnaire survey to evaluate the ability and motivation with respect to organ donation. To evaluate the effectiveness of the workshops, we conducted post-workshop and 3-months-after workshop questionnaire surveys. The results of the pre-workshop survey revealed that in-hospital procurement coordinators lacked the knowledge regarding the entire organ donation process, the current status of organ donation in Japan, and the definition of brain death. Moreover, they did not completely understand the meaning of "organ donation." The results of the post-workshop questionnaire survey showed that the educational program was effective to improve the knowledge and skills of organ donation and motivated behavioral changes among the participants. The survey results showed that our TPM model educational program offered sufficient knowledge and skills to increase organ donation at Hyogo Prefecture. We will continue this program and make an effort to further contribute to the Japanese organ donation activities. Copyright © 2016 Elsevier Inc. All rights reserved.
Management of Powdery Mildew in Squash by Plant and Alga Extract Biopesticides
Zhang, Shouan; Mersha, Zelalem; Vallad, Gary E.; Huang, Cheng-Hua
2016-01-01
Although many fungicides are registered for use to control powdery mildew on cucurbits, management of resistance to fungicides in pathogen populations still remains a major challenge. Two biopesticides Regalia SC and HMO 736 were evaluated in the greenhouse and field for their efficacy against powdery mildew in squash. In greenhouses, Regalia SC alone significantly (P < 0.05) reduced powdery mildew compared to the nontreated control, and was as effective as the chemical standard Procure 480SC (triflumizole). In alternation with Procure 480SC, Regalia SC demonstrated greater or equivalent effects on reducing the disease. HMO 736 alone showed varying levels of disease control, but alternating with Procure 480SC significantly improved control efficacy. In addition, application of Regalia SC or HMO 736 each in alternation with Procure 480SC significantly increased the chlorophyll content in leaves and the total fresh weight of squash plants, when compared with the water control, Regalia SC and HMO 736 alone. In field trials, application of Regalia SC and HMO 736 each alone significantly reduced disease severity in one of two field trials during the early stage of disease development, but not during later stages when disease pressure became high. Both Regalia SC and HMO 736 each applied in alternation with Procure 480SC significantly improved the control efficacy compared to Procure 480SC alone. Results from this study demonstrated that an integrated management program can be developed for powdery mildew in squash by integrating the biopesticides Regalia SC, HMO 736 with the chemical fungicide Procure 480SC. PMID:27904459
Management of Powdery Mildew in Squash by Plant and Alga Extract Biopesticides.
Zhang, Shouan; Mersha, Zelalem; Vallad, Gary E; Huang, Cheng-Hua
2016-12-01
Although many fungicides are registered for use to control powdery mildew on cucurbits, management of resistance to fungicides in pathogen populations still remains a major challenge. Two biopesticides Regalia SC and HMO 736 were evaluated in the greenhouse and field for their efficacy against powdery mildew in squash. In greenhouses, Regalia SC alone significantly ( P < 0.05) reduced powdery mildew compared to the nontreated control, and was as effective as the chemical standard Procure 480SC (triflumizole). In alternation with Procure 480SC, Regalia SC demonstrated greater or equivalent effects on reducing the disease. HMO 736 alone showed varying levels of disease control, but alternating with Procure 480SC significantly improved control efficacy. In addition, application of Regalia SC or HMO 736 each in alternation with Procure 480SC significantly increased the chlorophyll content in leaves and the total fresh weight of squash plants, when compared with the water control, Regalia SC and HMO 736 alone. In field trials, application of Regalia SC and HMO 736 each alone significantly reduced disease severity in one of two field trials during the early stage of disease development, but not during later stages when disease pressure became high. Both Regalia SC and HMO 736 each applied in alternation with Procure 480SC significantly improved the control efficacy compared to Procure 480SC alone. Results from this study demonstrated that an integrated management program can be developed for powdery mildew in squash by integrating the biopesticides Regalia SC, HMO 736 with the chemical fungicide Procure 480SC.
reduction opportunities Domestic electricity markets Corporate renewable procurement Research Interests State and Local Clean Energy Policy Impact Analysis Corporate Renewable Energy Procurement Strategies
21 CFR 1315.30 - Procurement and import quotas.
Code of Federal Regulations, 2014 CFR
2014-04-01
... PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Procurement and Import Quotas... adequate and uninterrupted supply of, ephedrine, pseudoephedrine, and phenylpropanolamine the Administrator...
21 CFR 1315.30 - Procurement and import quotas.
Code of Federal Regulations, 2011 CFR
2011-04-01
... PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Procurement and Import Quotas... adequate and uninterrupted supply of, ephedrine, pseudoephedrine, and phenylpropanolamine the Administrator...
21 CFR 1315.30 - Procurement and import quotas.
Code of Federal Regulations, 2010 CFR
2010-04-01
... PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Procurement and Import Quotas... adequate and uninterrupted supply of, ephedrine, pseudoephedrine, and phenylpropanolamine the Administrator...
21 CFR 1315.30 - Procurement and import quotas.
Code of Federal Regulations, 2012 CFR
2012-04-01
... PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Procurement and Import Quotas... adequate and uninterrupted supply of, ephedrine, pseudoephedrine, and phenylpropanolamine the Administrator...
21 CFR 1315.30 - Procurement and import quotas.
Code of Federal Regulations, 2013 CFR
2013-04-01
... PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Procurement and Import Quotas... adequate and uninterrupted supply of, ephedrine, pseudoephedrine, and phenylpropanolamine the Administrator...
Prime Contract Awards by State, Fiscal Year 1988
1988-01-01
information on Department of Defense procurement actions. Data are broken down into three categories: 1) Total U.S. Actions, 2) Actions Not Distributed...and civil functions (i.e., US. Army Corps of Engineers--Civil Works) procurements are represented- The data are presented by state and include the...also provide, for comparison purposes, data for the fourth quarters of FY 1988 and FY 1987. The total net value of military procurement actions for
Addendum to the Final Audit Report on Procurement of Spare Parts and Supplies
1993-06-04
Contraves USA, Simulation and Systems Integration, Tampa, FL Contract No.: N00104-89-G-A050-4009 Awarded: April 20, 1990 Procurement Method...awarded sole source to Contraves . The amplifier is a source-controlled item, and Contraves is the only approved source. There are no commercial...The total contract value was $69,552. Contraves assembled and tested the amplifiers. For the subject procurement, Contraves paid $* per unit for the
Competitive Advantage, Uncertainty, and Weapons Procurement: Striking Balance for the Future
2009-05-02
position of the Department of the Army, Department of Defense, or the U.S. Government. COMPETITIVE ADVANTAGE , UNCERTAINTY, AND WEAPONS PROCUREMENT: STRIKING...Competitive Advantage , Uncertainty, and Weapons Procurement: Striking Balance for the Future 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...the right balance of investments all leading to a sustained competitive advantage . This paper presents an analysis of how effective this overhaul has