NASA Astrophysics Data System (ADS)
Ninomiya, Hitoshi; Nanerikawa, Susumu
Public procurement system such as Overall-Evaluation dynamically has been changed on local public works in Japan. However some characteristics of Bidding-Strategy and procurement system have not enough clarified. This paper attempt to analysis for a syatem dynamics and mechanisum of Overall-Evaluation by developing new simulation model focused on Bidding-Strategy, to propose some improvement scenario.
An Analysis of Bid Evaluation Procedures of Contemporary Models for Procurement in Pakistan
2016-12-01
21 E. COMPONENTS FOR BID EVALUATION .........................................21 1. Market Intelligence...PROCUREMENT SYSTEM ...............................................23 1. Basic Principles ...43 1. Principles of Procurement and Prequalification .......................43 2. Contract Types
Proceedings: 1990 EPRI gas turbine procurement seminar
DOE Office of Scientific and Technical Information (OSTI.GOV)
McDonald, B.L.; Miller, M.N.
1991-06-01
This seminar presents information that enables utilities to implement more cost-effective procurements for gas turbine and combined-cycle power generation equipment. A systematic approach to specification and permitting procedures can lower unit life-cycle cost. APPROACH. Thirty-two staff members from 25 utilities met in Danvers, Massachusetts, October 9--11, 1990. Speakers representing utilities, vendors, and EPRI contractors presented material on recent procurement and startup experiences, permitting considerations, specification strategy, bid evaluation techniques, and a vendor's perspective of utility procurements. KEY POINTS. The seminar focused on specification features, procurement procedures, and bid evaluation techniques designed to implement life-cycle cost-effective procurement consistent with the plantmore » mission. Speakers highlighted the following issues: Experiential case histories of recent procurements and startups, emphasizing how to design procurement procedures that improve plant operating economics; Current trends in permitting for NO{sub x} compliance and recent permitting experience; Quantifiable evaluations of vendors' bids for RAM-related characteristics; The means to obtain specifically desired but nonstandard equipment features.« less
Bidding: Getting the Best Price for School Foodservice.
ERIC Educational Resources Information Center
DiBella, Cecilia M.
1998-01-01
Sharon (Massachusetts) Public Schools developed an alternative procurement process for school food services that complies with state public bidding laws while evading "low-bid" constraints. The new process features evaluative criteria covering nutrition education, community outreach, management expertise, site visits, and price…
24 CFR 135.11 - Other laws governing training, employment, and contracting.
Code of Federal Regulations, 2011 CFR
2011-04-01
... preference in the evaluation of bids or proposals. (2) Flexible Subsidy Program. Multifamily project... practices it selects provide preference to section 3 business concerns. (b) Procurement standards for other... statute that expressly encourages a geographic preference in the evaluation of bids or proposals. (c...
7 CFR 277.14 - Procurement standards.
Code of Federal Regulations, 2013 CFR
2013-01-01
... must fulfill and all other factors to be used in evaluating bids or proposals. (2) State agencies shall... simple and informal procurement methods that are sound and appropriate for a procurement of services... negotiation, proposals are requested from a number of sources and the Request for Proposal is publicized...
Cross-national research on contractor evaluation procedures in public works procurement
NASA Astrophysics Data System (ADS)
Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya
Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.
Myths, Misconceptions, and Realities about Public Procurement Automation.
ERIC Educational Resources Information Center
Bonner, Larry
1989-01-01
Meaningful public procurement and inventory management automation encompasses all purchasing and materials management processes, including bidder selection; bidder responsiveness tracking; preparation of bid solicitations; bid tabulation; the tracking of requisitions, bid solicitations, and deliveries; and item purchasing history reports. (MLH)
7 CFR 226.22 - Procurement standards.
Code of Federal Regulations, 2013 CFR
2013-01-01
... which offerors must fulfill and all other factors to be used in evaluating bids or proposals. (2) Awards... purchase procedures are those relatively simple and informal procurement methods that are sound and... documented business reasons in the best interest of the Program. (3) In competitive negotiation, proposals...
7 CFR 226.22 - Procurement standards.
Code of Federal Regulations, 2012 CFR
2012-01-01
... which offerors must fulfill and all other factors to be used in evaluating bids or proposals. (2) Awards... purchase procedures are those relatively simple and informal procurement methods that are sound and... documented business reasons in the best interest of the Program. (3) In competitive negotiation, proposals...
NASA Astrophysics Data System (ADS)
Oo, B. L.; Yan, Y.
2018-04-01
There are many variables that public clients need to consider in their bidding procedure to enhance efficiency in their procurement for construction services. This paper focusses on the competitive bidding process for public sector procurement of construction services in Singapore. A distinctive feature of the Singapore government competitive bidding process is that full bidding feedback information is released to all competing bidders (and public). The specific objectives are: (i) to examine the degree of competition in the construction markets; and (ii) to examine the bidding performance of competing bidders. Based on a collection of bidding data for a 15-month period, the results show the market environment of the Singapore public sector construction contracting is highly competitive with long bidder lists. In selection of contractors, only 50% of the contracts were awarded to lowest bidders. The results also show that the competing contractors can be broadly classified into three groups based on their bidding performance in terms of number of bidding attempts, bidding success rate and bidding competitiveness. These results provide a useful insight into the bidding competition in the Singapore public sector construction contracting, especially to new market entrants and foreign contractors who want to bid for jobs in Singapore.
Designing a Successful Bidding Strategy Using Fuzzy Sets and Agent Attitudes
NASA Astrophysics Data System (ADS)
Ma, Jun; Goyal, Madhu Lata
To be successful in a multi-attribute auction, agents must be capable of adapting to continuously changing bidding price. This chapter presents a novel fuzzy attitude-based bidding strategy (FA-Bid), which employs dual assessment technique, i.e., assessment of multiple attributes of the goods as well as assessment of agents' attitude (eagerness) to procure an item in automated auction. The assessment of attributes adapts the fuzzy sets technique to handle uncertainty of the bidding process as well use heuristic rules to determine the attitude of bidding agents in simulated auctions to procure goods. The overall assessment is used to determine a price range based on current bid, which finally selects the best one as the new bid.
Competition in the economic crisis: Analysis of procurement auctions.
Gugler, Klaus; Weichselbaumer, Michael; Zulehner, Christine
2015-01-01
We study the effects of the recent economic crisis on firms׳ bidding behavior and markups in sealed bid auctions. Using data from Austrian construction procurements, we estimate bidders׳ construction costs within a private value auction model. We find that markups of all bids submitted decrease by 1.5 percentage points in the recent economic crisis, markups of winning bids decrease by 3.3 percentage points. We also find that without the government stimulus package this decrease would have been larger. These two pieces of evidence point to pro-cyclical markups.
Code of Federal Regulations, 2011 CFR
2011-01-01
... evaluation preference is not applied to change an offer and benefit a non-HUBZone SBC. Example 3: In a full... be awarded that is not greater than 25% of the total volume being procured for each commodity in a... than 25%, but not greater than 40%, of the total volume being procured for each commodity in a single...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.420 Accounting for independent research and development costs and bid and proposal costs. ...
14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements
Code of Federal Regulations, 2014 CFR
2014-01-01
.... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...
14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements
Code of Federal Regulations, 2010 CFR
2010-01-01
.... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...
14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements
Code of Federal Regulations, 2012 CFR
2012-01-01
.... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...
14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements
Code of Federal Regulations, 2013 CFR
2013-01-01
.... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...
14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements
Code of Federal Regulations, 2011 CFR
2011-01-01
.... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...
7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.
Code of Federal Regulations, 2013 CFR
2013-01-01
... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...
7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.
Code of Federal Regulations, 2012 CFR
2012-01-01
... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...
7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.
Code of Federal Regulations, 2010 CFR
2010-01-01
... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...
7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.
Code of Federal Regulations, 2011 CFR
2011-01-01
... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...
7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.
Code of Federal Regulations, 2014 CFR
2014-01-01
... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...
Procurement and Contracting, Transportation & Public Facilities, State of
Calendar Bid Opening Results Contract Award Status AASHTOWare Project Vendor List Contractor Bidding List Contractor Bidding Information Requests for Proposals Professional Services Request for Proposals
1992-10-01
sealed bidding and competitive proposals. governed by the same regulations and laws The sealed bidding procedure requires ade- that govern procurement ...Summary xiv NDI ACQUISITION: An Alternative to "Business as Usual" to successful, effective government procure - posal Cover Sheet). Moreover, the...became policy when the OPlP ;,;sued the first opment costs. These benefits may be offset by in a series of memoranda governing procure - performance
Marginal Bidding: An Application of the Equimarginal Principle to Bidding in TAC SCM
NASA Astrophysics Data System (ADS)
Greenwald, Amy; Naroditskiy, Victor; Odean, Tyler; Ramirez, Mauricio; Sodomka, Eric; Zimmerman, Joe; Cutler, Clark
We present a fast and effective bidding strategy for the Trading Agent Competition in Supply Chain Management (TAC SCM). In TAC SCM, manufacturers compete to procure computer parts from suppliers (the procurement problem), and then sell assembled computers to customers in reverse auctions (the bidding problem). This paper is concerned only with bidding, in which an agent must decide how many computers to sell and at what prices to sell them. We propose a greedy solution, Marginal Bidding, inspired by the Equimarginal Principle, which states that revenue is maximized among possible uses of a resource when the return on the last unit of the resource is the same across all areas of use. We show experimentally that certain variations of Marginal Bidding can compute bids faster than our ILP solution, which enables Marginal Bidders to consider future demand as well as current demand, and hence achieve greater revenues when knowledge of the future is valuable.
Pavement marking demonstration projects : state of Alaska and state of Tennessee.
DOT National Transportation Integrated Search
2013-11-01
This project evaluates the safety impacts, environmental impacts, and cost effectiveness of different pavement marking : systems as well as the effect of State bidding and procurement processes on the quality of pavement marking material : employed i...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 12 2012-01-01 2012-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 12 2013-01-01 2013-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 12 2014-01-01 2013-01-01 true Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 12 2011-01-01 2011-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1726.201 - Formal competitive bidding.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...
7 CFR 1726.201 - Formal competitive bidding.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...
7 CFR 1726.201 - Formal competitive bidding.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...
7 CFR 1726.201 - Formal competitive bidding.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...
7 CFR 1726.201 - Formal competitive bidding.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may use alternate construction procurement methods to the traditional design/bid/build procedures... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Allowable methods of procurement...
7 CFR 3565.257 - Procurement actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...
7 CFR 3565.257 - Procurement actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...
7 CFR 1753.48 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
...' qualifications for all types of construction and for the required information on the bidder and subcontractors... qualified to submit bids, RUS written approval must be obtained to proceed with requesting bids. (4) Bid...) Materials on hand to be furnished by the borrower shall be released to the contractor at the start of...
Competitive negotiation: the Virginia SCC's model for procurement of generating capacity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Virginia SCC, in approving competitive alternatives to avoided costs under PURPA, rejected competitive bidding in favor of competitive negotiation for power sales contracts. The difference is important, and points in the direction of increased discretion for utilities seeking new generating capacity from independents. The distinction between competitive bidding, and competitive negotiation, in a nutshell, is that in a bid, the low price bidder wins. In a negotiation, the offeror of the most-meritorious proposals are ranked, and an attempt to reach agreement on price is made with the high-ranked offeror. Only if there is no agreement on price will themore » most-meritorious bid be rejected, and negotiations with the offeror of the next best proposal begun. The Virginia Public Procurement Act, Sec. II-37, Definitions, Parts 1, 2, and 3.a. is included.« less
40 CFR 30.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-07-01
... competition when competitive bids or offers are not obtained; and basis for award cost or price. ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 30.46...
14 CFR 1260.146 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260.146... of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...
7 CFR 3019.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) Justification for lack of competition bids or offers are not obtained, and (c) Basis for award cost or price. ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement...
36 CFR 1210.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-07-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards...) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...
2 CFR 215.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... NON-PROFIT ORGANIZATIONS (OMB CIRCULAR A-110) Post Award Requirements Procurement Standards § 215.46... of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...
22 CFR 145.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145... for lack of competition when competitive bids or offers are not obtained, and (c) basis for award cost or price. ...
24 CFR 84.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84... for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...
32 CFR 32.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 32.46... for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...
41 CFR 105-72.506 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-07-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.50-Post-Award Requirements/Procurement Standards...) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...
38 CFR 49.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 49.46... of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. (Authority: Pub. L. 104-156; 110 Stat. 1396) ...
Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method
NASA Astrophysics Data System (ADS)
Alptekin, Orkun; Alptekin, Nesrin
2017-10-01
Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.
75 FR 54560 - Federal Acquisition Regulation; Clarification of Standard Form 26-Award/Contract
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... changes will not prohibit the use of the SF 26 for awarding negotiated procurements; it will only prohibit... Budget under 44 U.S.C. chapter 35, et seq. List of Subjects in 48 CFR Part 53 Government procurement... be used when awarding a negotiated procurement and should only be checked when awarding a sealed-bid...
14 CFR 1274.507 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Procurement records. 1274.507 Section 1274.507 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH...) Basis for contractor selection. (b) Justification for lack of competition when competitive bids or...
Code of Federal Regulations, 2011 CFR
2011-07-01
... complainant, the grantee's procurement action (for example, contract award) must be taken in accordance with...) of this section should be made as early as possible during the procurement process (for example... grantee proposes to award a formally advertised, competitively bid, fixed price contract to a party who...
DOT National Transportation Integrated Search
2000-03-01
Procurement of Intelligent Transportation System (ITS) projects using Federal-aid funds can present challenges that are not typically observed in traditional transportation projects. Many roadway improvement projects involve the two-step "Design-Bid-...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... at FAR 53.215-1(a) to read ``Block 18 may not be used for negotiated procurements.'' This change does... U.S.C. chapter 35, et seq. List of Subjects in 48 CFR Parts 15 and 53 Government procurement. [[Page... negotiated procurement and emphasize that block 18 should only be checked when awarding a sealed bid contract...
24 CFR 1000.52 - What Indian preference requirements apply to IHBG procurement?
Code of Federal Regulations, 2010 CFR
2010-04-01
... requirements of this section); or (2) Advertise for bids or proposals limited to qualified Indian organizations... responses are received from more than one Indian enterprise found to be qualified, advertise for bids or... reasonable cost, then the recipient shall: (1) Re-advertise the contract, using any of the methods described...
7 CFR 226.21 - Food service management companies.
Code of Federal Regulations, 2011 CFR
2011-01-01
... procurements of meals from food service management companies shall adhere to the procurement standards set... provisions set forth in § 226.22, the State agency may mandate that each institution with Program meal... shall include the time and place of the bid opening; (2) The institution shall notify the State agency...
Code of Federal Regulations, 2010 CFR
2010-10-01
... a particular procurement: (1) Individuals who generate contract requirements, including program and... the contracting activity directly involved in the procurement; (4) Supervisors in the CO's chain of... ethics official and servicing Ethics Counselors; (17) Members of Congress and members of their staff...
40 CFR 35.4210 - Must my group solicit and document bids for our procurements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4210 Must my group solicit and... the work; (ii) Provide potential sources in the scope of work to be performed and the criteria your...
ERIC Educational Resources Information Center
Donaldosn, William S.; Stephens, Thomas M.
1979-01-01
Sections address the RFP/IFB (Request for Proposals/Invitation for Bids) process and procedures for selecting the "best" contract. In reviewing the federal procurement code, and the recent decision of the Government Accounting Office, particularly regarding the NIMIS (National Instructional Materials Information System contract), inconsistencies…
Cost containment through pharmaceutical procurement: a Caribbean case study.
Huff-Rousselle, M; Burnett, F
1996-01-01
This article discusses the potential for health sector cost containment in developing countries through improved pharmaceutical procurement. By describing the specific example of the Eastern Caribbean Drug Service (ECDS), which provides a pooled procurement service to nine ministries of health in the small island nations of the Caribbean, it examines the elements of the procurement operation that allowed ECDS to reduce unit costs for pharmaceuticals by over 50 per cent during its first procurement cycle. The analysis of ECDS considers: (1) political will, institutional alliances, and the creation of a public sector monopsony; (2) pooling demand; (3) restricted international tendering and the pharmaceutical industry; (4) estimating demand and supplier guarantees; (5) reducing variety and increasing volume through standardizing pack sizes, dosage forms and strengths; (6) generic bidding and therapeutic alternative bidding; (7) mode of transport from foreign suppliers; (8) financing mechanisms, including choice of currency, foreign exchange, and terms of payment; (9) market conditions and crafting and enforcing supplier contracts; and, (10) the adjudication process, including consideration of suppliers' past performance, precision requirements in the manufacturing process, number of products awarded to suppliers, and issues of judgment. The authors consider the relevance of this agency's experience to other developing countries by providing a blueprint that can be adopted or modified to suit other situations.
Transformation of fraud activities in procurement system in Indonesia
NASA Astrophysics Data System (ADS)
Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.
2017-03-01
E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.
The Political Economy of the Munitions Supply Program
2014-05-01
franchisees bid their true costs.47 Third, once supply is forthcoming, the franchisee has an incentive to minimize costs unless the franchiser is known... franchisee skimps on quality. In this regard, the franchiser has an incentive to preserve its “smart customer” capabilities, particularly if bids...term procurement program that sustains a domestic munitions industrial base that consists of a group of government- franchised mo- nopolies contracted
15 CFR 14.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ... FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND...
Armed Services Pricing Manual (ASPM)
1986-01-01
NOTES 14. ABSTRACT 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as Report (SAR) 18. NUMBER OF PAGES 361...f. National security . g. Public interest. Two kinds of solicitations are equally acceptable: invitations for bids Fl3s), for sealed bidding, and...2.12 2-14 2-14 2-15 2-15 The objective of procurement is to secure needed supplies and services fr( nsi b I e at fair and reasonable prices calculated
43 CFR 12.946 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... With Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations Post-Award...) Justification for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...
7 CFR 550.48 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements... selection; (b) Justification for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-18
... comments on or before: June 17, 2011. FOR FURTHER INFORMATION CONTACT: Michael O. Jackson, Procurement Analyst, Contract Policy Branch, at telephone (202) 208-4949 or michaelo.jackson@gsa.gov . ADDRESSES...
22 CFR 518.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-04-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award... selection, (b) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...
49 CFR 19.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award... selection, (b) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...
13 CFR 121.1004 - What time limits apply to size protests?
Code of Federal Regulations, 2010 CFR
2010-01-01
..., Sundays, and legal holidays, after bid or proposal opening. (2) Negotiated procurement. A protest must be... paragraph (e), for purposes of the SBIR program the contracting officer and SBA may file a protest in...
13 CFR 121.1004 - What time limits apply to size protests?
Code of Federal Regulations, 2011 CFR
2011-01-01
..., Sundays, and legal holidays, after bid or proposal opening. (2) Negotiated procurement. A protest must be... paragraph (e), for purposes of the SBIR program the contracting officer and SBA may file a protest in...
13 CFR 121.1004 - What time limits apply to size protests?
Code of Federal Regulations, 2012 CFR
2012-01-01
..., Sundays, and legal holidays, after bid or proposal opening. (2) Negotiated procurement. A protest must be... paragraph (e), for purposes of the SBIR program the contracting officer and SBA may file a protest in...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-03
... comments on or before: September 2, 2011. FOR FURTHER INFORMATION CONTACT: Michael O. Jackson, Procurement Analyst, Contract Policy Branch, at telephone (202) 208-4949 or michaelo.jackson@gsa.gov . ADDRESSES...
Contracting Officer Workload and Contractual Terms: Theory and Evidence
2012-08-30
should be conducted in accordance with simplified acquisitions procedures and are explicitly set aside for small businesses . These awards are known as...analyze a set of California Highway Procurement auctions and find that the ex-post adaptation costs make up between 7 and 13% of the winning bid...and simply assume he is facing some set of incentives that leads him to value saving time and money on the project and on its procurement . Having him
45 CFR 2543.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...: (a) Basis for contractor selection; (b) Justification for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...
Wang, Y Claire; Hsiao, Amber; Chamberlin, Peter; Largay, McKenzie; Archibald, Abbie; Malone, Andrew; Stevelos, JoAnn
2017-01-01
As part of the Healthy, Hunger-Free Kids Act, snacks, and desserts sold in K-12 schools as of the 2014-2015 school year are required to meet the "Smart Snacks" nutritional guidelines. Although studies exist in tracking progress in local and national efforts, the proportion of snack food procured by school districts compliant with the Smart Snacks standard prior to its full implementation is unknown. We repurposed a previously untapped database, Interflex, of public bid records to examine the nutritional quality of snacks and desserts procured by school districts. We selected 8 school districts with at least 90% complete data each year during 2011-2012, 2012-2013, and 2013-2014 school years and at locations across different regions of the United States. We quantified the amount of calories and sugar of each product contained in the won bids based on available online sources and determined whether the produce complied with Smart Snack guidelines. In all 8 districts (snack expenditure analyzed ranging from $152,000 to $4.4 million), at least 50% of snack bids were compliant with the US Department of Agriculture Smart Snacks standard during the 2013-2014 school year. Across sampled districts, we observed a general trend in lower caloric density (kcal per product) and sugar density (grams of sugar per product) over a 3-year period. Many districts across the country have made headway in complying with the Smart Snack guidelines, though gaps remain. © 2016, American School Health Association.
42 CFR 495.348 - Procurement standards.
Code of Federal Regulations, 2011 CFR
2011-10-01
... specifications, requirements, statements of work, invitations for bids and requests for proposals must be... small businesses, minority-owned firms, and women's business enterprises, whenever possible. Grantees of..., minority-owned firms, and women's business enterprises are used to the fullest extent practicable. (ii...
DOT National Transportation Integrated Search
2000-03-01
Procurement of Intelligent Transportation System (ITS) projects using Federal-aid funds can present challenges that are not typically observed in traditional transportation projects. Many roadway improvement projects involve the two-step "Design-Bid-...
Study on Comparison of Bidding and Pricing Behavior Distinction between Estimate Methods
NASA Astrophysics Data System (ADS)
Morimoto, Emi; Namerikawa, Susumu
The most characteristic trend on bidding and pricing behavior distinction in recent years is the increasing number of bidders just above the criteria for low-price bidding investigations. The contractor's markup is the difference between the bidding price and the execution price. Therefore, the contractor's markup is the difference between criteria for low-price bidding investigations price and the execution price in the public works bid in Japan. Virtually, bidder's strategies and behavior have been controlled by public engineer's budgets. Estimation and bid are inseparably linked in the Japanese public works procurement system. The trial of the unit price-type estimation method begins in 2004. On another front, accumulated estimation method is one of the general methods in public works. So, there are two types of standard estimation methods in Japan. In this study, we did a statistical analysis on the bid information of civil engineering works for the Ministry of Land, Infrastructure, and Transportation in 2008. It presents several issues that bidding and pricing behavior is related to an estimation method (several estimation methods) for public works bid in Japan. The two types of standard estimation methods produce different results that number of bidders (decide on bid-no bid strategy) and distribution of bid price (decide on mark-up strategy).The comparison on the distribution of bid prices showed that the percentage of the bid concentrated on the criteria for low-price bidding investigations have had a tendency to get higher in the large-sized public works by the unit price-type estimation method, comparing with the accumulated estimation method. On one hand, the number of bidders who bids for public works estimated unit-price tends to increase significantly Public works estimated unit-price is likely to have been one of the factors for the construction companies to decide if they participate in the biddings.
28 CFR 70.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON... following at a minimum: (a) Basis for contractor selection, (b) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...
34 CFR 74.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-07-01
... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements... selection; (b) Justification for lack of competition when competitive bids or offers are not obtained; (c) Basis for award cost or price. (Approved by the Office of Management and Budget under control number...
Code of Federal Regulations, 2010 CFR
2010-07-01
... (generally, for formally advertised procurement, after bid opening, within 1 week after the basis for the...'s written or other formal notice is first received. (2) A protest appeal authorized by paragraph (e... constitute final agency action, from which there shall be no further administrative appeal. The Regional...
Pooling procurement in the Belgian hospital sector.
Hebert, Guy
2011-01-01
The Belgian hospital sector is following the example of a number of other European countries and for more than ten years now, has been striving to pool its medical supplies and equipment purchases in a bid to reduce costs. The various experiments of which we are aware come under both opportunist purchases and initiatives which are designed to encourage local-regional contracts. These attempts have now all come to nothing or are struggling in the absence of a structured and professional approach. In 2005, the Saint Luc University Clinic in Brussels decided to set up a high-performance purchasing department, the aim being to centre its initiatives around TCO or Total Cost of Ownership. Following an analysis of the various experiments into pooling procurement in hospitals in Europe, the Saint Luc University Clinic decided on a central procurement agency model, in accordance with new legislation on public procurement. This article seeks to highlight the prerequisites which are vital for a procurement pooling initiative, without underestimating the risks and limitations of implementing such a change in procurement practices. The Mercure central procurement agency is now the largest interhospital purchasing structure in Belgium.
1991-12-01
associated with ADP/FIP protests. Navy and Marine Corps contracting agencies w\\ere contacted to determine their current experience in ADP/’FIP contracting...an emphasis on the GSBCA. A protestor has many options in vhich to "avenge" their wrong. A Contracting Officer can therefore expect a variety of...subject to their exclusive procurement authority. The term ADPE and ADP/FIP will be used somewhat loosely. In most cases, the acronyms include
40 CFR 35.936-18 - Negotiation of subagreements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Negotiation of subagreements. 35.936-18... Negotiation of subagreements. (a) Formal advertising, with adequate purchase descriptions, sealed bids, and public openings shall be the required method of procurement unless negotiation under paragraph (b) of...
40 CFR 35.936-18 - Negotiation of subagreements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Negotiation of subagreements. 35.936-18... Negotiation of subagreements. (a) Formal advertising, with adequate purchase descriptions, sealed bids, and public openings shall be the required method of procurement unless negotiation under paragraph (b) of...
40 CFR 35.936-18 - Negotiation of subagreements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Negotiation of subagreements. 35.936-18... Negotiation of subagreements. (a) Formal advertising, with adequate purchase descriptions, sealed bids, and public openings shall be the required method of procurement unless negotiation under paragraph (b) of...
Supply Chain Management: Are You Maximizing Your Procurement Activity?
ERIC Educational Resources Information Center
Dobbin, James; Jenkins, Mike
2000-01-01
Today's purchasing professionals recognize the need to reduce non-value-added procedures (clerical functions) while emphasizing strategic planning. Results-oriented supply-chain managers need superb communication, negotiation, and leadership skills to achieve long-term value and resist the lowest, first- cost bids. (Contains 13 references.) (MLH)
ERIC Educational Resources Information Center
Schreyer, Paul R.
2012-01-01
Given our aging and crowded schools, today's administrators have to focus their attention on modernizing facilities. The Job Order Contracting (JOC) procurement method allows school administrators to complete a large number of high quality maintenance projects quickly with a single, competitively bid contract. The JOC process fits schools' unique…
40 CFR 35.936-18 - Negotiation of subagree-ments.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Negotiation of subagree-ments. 35.936... § 35.936-18 Negotiation of subagree-ments. (a) Formal advertising, with adequate purchase descriptions, sealed bids, and public openings shall be the required method of procurement unless negotiation under...
40 CFR 35.936-18 - Negotiation of subagree-ments.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Negotiation of subagree-ments. 35.936... § 35.936-18 Negotiation of subagree-ments. (a) Formal advertising, with adequate purchase descriptions, sealed bids, and public openings shall be the required method of procurement unless negotiation under...
Code of Federal Regulations, 2013 CFR
2013-10-01
... BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 3.104-1 Definitions. As used in this... proposal information means any of the following information submitted to a Federal agency as part of or in connection with a bid or proposal to enter into a Federal agency procurement contract, if that information...
Code of Federal Regulations, 2012 CFR
2012-10-01
... BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 3.104-1 Definitions. As used in this... proposal information means any of the following information submitted to a Federal agency as part of or in connection with a bid or proposal to enter into a Federal agency procurement contract, if that information...
Code of Federal Regulations, 2014 CFR
2014-10-01
... BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 3.104-1 Definitions. As used in this... proposal information means any of the following information submitted to a Federal agency as part of or in connection with a bid or proposal to enter into a Federal agency procurement contract, if that information...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-16
...: Notice of request for public comments regarding an extension to an existing OMB clearance. SUMMARY: Under...: Ms. Cecelia L. Davis, Procurement Analyst, Acquisition Policy Division, GSA (202) 219-0202 or email... to obtaining financial protection against damages under Government contracts (e.g., use of bonds, bid...
29 CFR 95.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Secretary of Labor GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON..., (b) justification for lack of competition when competitive bids or offers are not obtained, and (c) basis for award cost or price. [59 FR 38271, July 27, 1994, as amended at 72 FR 37104, July 9, 2007] ...
41 CFR 101-26.501-7 - Sale of vehicles.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Sale of vehicles. 101-26... PROGRAM 26.5-GSA Procurement Programs § 101-26.501-7 Sale of vehicles. GSA will not solicit trade-in bids when purchasing new motor vehicles for replacement purposes because experience has shown that suppliers...
41 CFR 101-26.501-7 - Sale of vehicles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Sale of vehicles. 101-26... PROGRAM 26.5-GSA Procurement Programs § 101-26.501-7 Sale of vehicles. GSA will not solicit trade-in bids when purchasing new motor vehicles for replacement purposes because experience has shown that suppliers...
22 CFR 201.14 - Eligibility of bid and performance bonds and guaranties.
Code of Federal Regulations, 2010 CFR
2010-04-01
... APPLICABLE TO COMMODITY TRANSACTIONS FINANCED BY USAID Conditions Governing the Eligibility of Procurement... international trade for the type of transaction and commodity involved. Bonds or guaranties may be payable in U.S. dollars, or a freely convertible currency or local currency, and shall be posted in favor of the...
22 CFR 201.14 - Eligibility of bid and performance bonds and guaranties.
Code of Federal Regulations, 2011 CFR
2011-04-01
... APPLICABLE TO COMMODITY TRANSACTIONS FINANCED BY USAID Conditions Governing the Eligibility of Procurement... international trade for the type of transaction and commodity involved. Bonds or guaranties may be payable in U.S. dollars, or a freely convertible currency or local currency, and shall be posted in favor of the...
4 CFR 21.1 - Filing a protest.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 4 Accounts 1 2010-01-01 2010-01-01 false Filing a protest. 21.1 Section 21.1 Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES BID PROTEST REGULATIONS § 21.1 Filing a protest. (a) An interested party... 20548, Attention: Procurement Law Control Group. (c) A protest filed with GAO shall: (1) Include the...
13 CFR 121.1004 - What time limits apply to size protests?
Code of Federal Regulations, 2013 CFR
2013-01-01
..., after bid or proposal opening. (2) Negotiated procurement. A protest must be received by the contracting... paragraph (e), for purposes of the SBIR program the contracting officer and SBA may file a protest in... purposes of the SBIR and STTR programs. Notwithstanding paragraph (e), for purposes of the SBIR and STTR...
29 CFR 4.141 - General criteria for measuring amount.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Government for such work under his contract or may even agree to pay the Government in return for the right... formal advertising, in arriving at the aggregate amount involved, there must be included all property and... single advertisement for bids if the procurement were being effected by formal advertising. Therefore, if...
ERIC Educational Resources Information Center
Goldblatt, Steven M.; Wood, R. Craig
Construction management is utilized when a school district engages a firm to coordinate a total project. The construction management seeks to save an owner time and cost primarily through better contractor coordination and project management. These services may include the planning and design phases of the project as well as the actual…
NASA Astrophysics Data System (ADS)
Takahashi, Kenta; Hara, Ryoichi; Kita, Hiroyuki; Hasegawa, Jun
In recent years, as the deregulation in electric power industry has advanced in many countries, a spot market trading of electricity has been done. Generation companies are allowed to purchase the electricity through the electric power market and supply electric power for their bilateral customers. Under this circumstance, it is important for the generation companies to procure the required electricity with cheaper cost to increase their profit. The market price is volatile since it is determined by bidding between buyer and seller. The pumped storage power plant, one of the storage facilities is promising against such volatile market price since it can produce a profit by purchasing electricity with lower-price and selling it with higher-price. This paper discusses the optimal operation of the pumped storage power plants considering bidding strategy to an uncertain spot market. The volatilities in market price and demand are represented by the Vasicek model in our estimation. This paper also discusses the allocation of operational reserve to the pumped storage power plant.
41 CFR 101-26.501-7 - Sale of vehicles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Sale of vehicles. 101-26... PROGRAM 26.5-GSA Procurement Programs § 101-26.501-7 Sale of vehicles. GSA will not solicit trade-in bids... that are being replaced will be disposed of by sale as set forth in Part 101-46. [57 FR 47779, Oct. 20...
41 CFR 101-26.501-7 - Sale of vehicles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Sale of vehicles. 101-26... PROGRAM 26.5-GSA Procurement Programs § 101-26.501-7 Sale of vehicles. GSA will not solicit trade-in bids... that are being replaced will be disposed of by sale as set forth in Part 101-46. [57 FR 47779, Oct. 20...
Competitive bidding for health insurance contracts: lessons from the online HMO auctions.
Gupta, Alok; Parente, Stephen T; Sanyal, Pallab
2012-12-01
Healthcare is an important social and economic component of modern society, and the effective use of information technology in this industry is critical to its success. As health insurance premiums continue to rise, competitive bidding may be useful in generating stronger price competition and lower premium costs for employers and possibly, government agencies. In this paper, we assess an endeavor by several Fortune 500 companies to reduce healthcare procurement costs for their employees by having HMOs compete in open electronic auctions. Although the auctions were successful in generating significant cost savings for the companies in the first year, i.e., 1999, they failed to replicate the success and were eventually discontinued after two more years. Over the past decade since the failed auction experiment, effective utilization of information technologies have led to significant advances in the design of complex electronic markets. Using this knowledge, and data from the auctions, we point out several shortcomings of the auction design that, we believe, led to the discontinuation of the market after three years. Based on our analysis, we propose several actionable recommendations that policy makers can use to design a sustainable electronic market for procuring health insurance.
48 CFR 2052.214-72 - Bid evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Bid evaluation. 2052.214-72... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 2052.214-72 Bid evaluation. As... invitations for bids (paragraph “(f)” of this provision is optional): Bid Evaluation (JAN 1993) (a) Award will...
ERIC Educational Resources Information Center
Wang, Y. Claire; Hsiao, Amber; Chamberlin, Peter; Largay, McKenzie; Archibald, Abbie; Malone, Andrew; Stevelos, JoAnn
2017-01-01
Background:As part of the Healthy, Hunger-Free Kids Act, snacks, and desserts sold in K-12 schools as of the 2014-2015 school year are required to meet the "Smart Snacks" nutritional guidelines. Although studies exist in tracking progress in local and national efforts, the proportion of snack food procured by school districts compliant…
NASA Astrophysics Data System (ADS)
Satyaramesh, P. V.; RadhaKrishna, C.
2013-06-01
A generalized pricing structure for procurement of power under frequency ancillary service is developed in this paper. It is a frequency linked-price model and suitable for deregulation market environment. This model takes into consideration: governor characteristics and frequency characteristics of generator as additional parameters in load flow method. The main objective of the new approach proposed in this paper is to establish bidding price structure for frequency regulation services in competitive ancillary electrical markets under steady state condition. Lot of literatures are available for calculating the frequency deviations with respect to load changes by using dynamic simulation methods. But in this paper, the model computes the frequency deviations for additional requirements of power under steady state with considering power system network topology. An attempt is also made in this paper to develop optimal bidding price structure for the frequency-regulated systems. It gives a signal to traders or bidders that the power demand can be assessed more accurately much closer to real time and helps participants bid more accurate quantities on day-ahead market. The recent trends of frequency linked-price model existing in Indian power systems issues required for attention are also dealt in this paper. Test calculations have been performed on 30-bus system. The paper also explains adoptability of 33 this model to practical Indian power system. The results presented are analyzed and useful conclusions are drawn.
Competition in Weapon Systems Acquisition: Cost Analyses of Some Issues
1990-09-01
10% increments , also known as the step-ladder bids) submitted by the contractor in the first year of dual source procurement. The triangles represent...savings by subtracting annual incremental government costs, stated in constant dollars, from (3). (5) Estimate nonrecurring start-up costs, stated in...constant dollars, by fiscal year. (6) Estimate incremental logistic support costs, stated in constant dollars. by fiscal year. (7) Calculate a net
Naval Supply Systems Command Fleet Logistics Center
2012-08-08
Partial small business set - aside is a potential consideration 12-month Base plus two options Synopsis N00604-11-R-3006 on NECO and FedBizOpps...2012 Navy Gold Coast Small Business Procurement Event 8 August 2012 #1 PRIORITY = Operating Forces Support …while ensuring Joint...while ensuring Joint Base Success FedBid.com Reverse Auction Website 8 Small Business Assistance #1 PRIORITY = Operating Forces
An analysis of 1986 drug procurement practices in hospitals within the United States.
Smolarek, R T; Powell, M F; Solomon, D K; Boike, S C
1989-09-01
The purpose of this study was to statistically answer a set of predefined objectives concerning pharmaceutical procurement. The key indicators were assumed to be cost per patient day and turnover rate. Of the 5,911 surveys mailed, 709 surveys were returned for a 12% response rate. The following statements were based on attempts to answer the six predetermined objectives. Pharmaceutical purchasing is controlled by pharmacy departments to the extent that comparisons to pharmaceutical purchasing by materials management departments was not possible. Prime vendor purchasing is the procurement method of choice. Competitive bidding through a group process is so popular that a valid comparison to nongroup bidding could not be accomplished with the results of this survey. Certain variables of group purchasing such as group age, contract adherence, and volume commitment, do not appear to be correlated to purchasing outcomes in this study. When comparing government to private hospitals, the private sector seems to have an advantage in managing turnover rates. Cost per patient day results were less conclusive. As single and multiple hospital systems were compared for purchasing outcomes, the results were not totally conclusive. Although, multiple hospital systems had a significantly higher turnover rate. Finally, a comparison based on the use, or lack of use, of prime vendor arrangements demonstrated interesting results. The duration of contract did not significantly affect the purchasing outcomes. Other hospital variables such as size, type, ownership, and organization, demonstrated notable trends. The importance of examining hospitals based on case mix and mission seems to be most important. Also, the ability to relate purchasing outcomes with formulary management strategies needs further study before conclusive statements can be adopted.
Supporting SMEs in public sector bids.
James, Edward
2016-03-01
Edward James, workstream lead, Estates, Facilities and Professional Services Workstream, at NHS London Procurement Partnership (pictured), looks at the workings and benefits of Dynamic Purchasing Systems--electronic systems used by a public bodies to purchase commonly used goods, works, or services. One of the major benefits, he explains, is that under a 'DPS'--an 'open market' system revised in 2015--smaller businesses have a greater opportunity to win business than in traditional ('closed') framework agreements.
Design-Build vs Design-Bid-Build: A Procurement Method Selection Framework
2006-08-01
Kumaraswamy and Dissanayaka [16,17], Molenaar [12], Love, Skitmore, and Earl [3], and Konchar and Sanvido [ 13]. Kumaraswamy and Dissanayaka explored the...measuring 11 performance areas [ 16, 17]. Love, Skitmore, and Earl used expert surveys to poll attitudes toward different delivery options [3], while Molenaar ... Molenaar , Keith R., and Robinson, Graham D., Selection Factors and Success Criteria for Design-Build in the U.S. and U.K., University of Colorado, 1997
A New Paradigm to Address Bid Protests
2010-08-02
A two- player game model is being developed by members of the NPS Protest Project team that allows for shared awards (split buys). Split-buy remedies...11 - k^s^i=mlpqdo^ar^qb=p`elli= = The literature generally focuses on two players : a disappointed bidder20 and the government. In fact, the...government can be broken into several distinct players , each of which might expect a challenge from a disappointed bidder: procurement officials (POs) and
An Assessment of the Armed Forces of the Philippines Modernization Program
2007-12-14
Sayaff Group BAC Bids and Awards Committee BCDA Bases Conversion and Development Authority BEP Bid Evaluation Plan BIR Bureau of Internal Revenue...contractor execute the requirements of the contract with regard to cost, schedule and performance (Sammet and Green 1990, 136) Bid Evaluation Plan or BEP is...adopted in the evaluation and assessment of bidders’ statements and the method and criteria for the evaluation and assessment of bids. The BEP also
48 CFR 852.247-70 - Determining transportation costs for bid evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... costs for bid evaluation. 852.247-70 Section 852.247-70 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses 852.247-70 Determining transportation costs for bid evaluation. As prescribed in 847...
Drug procurement, the Global Fund and misguided competition policies
2009-01-01
In an effort to increase competition and decrease price, the Global Fund to Fight AIDS, Tuberculosis and Malaria recently began asking some grant recipients to use international competitive bidding processes for certain drug purchases. Unfortunately, for countries like Kenya, this request has caused more harm than good. After awarding the tender for its annual supply of the anti-malarial artemether-lumefantrine to the lowest bidder, Ajanta Pharma, Kenya experienced wide stock-outs in part due to the company's inability to supply the order in full and on time. Similar problems could arise in Uganda. Despite Kenya's experience, Uganda has awarded its next tender for artemether-lumefantrine to Ajanta Pharma. Uganda is already facing wide stock-outs and risks exacerbating an already dire situation the longer it takes to fulfil the procurement contract. A tender process based primarily on price cannot account for a company's ability to consistently supply sufficient product in time. PMID:20028536
Special experimental project (SEP-14) alternate surfacing bidding.
DOT National Transportation Integrated Search
2008-03-01
This report contains a discussion of the alternate bidding process used on a highway project in Kansas. : It discusses the background, bidding process, evaluation of the bids, and conclusions drawn from the : experience. It also includes a customer s...
One-year assessment of joint procurement of pharmaceuticals in the public health sector in Jordan.
Al-Abbadi, Ibrahim; Qawwas, Abdelraouf; Jaafreh, Mahmoud; Abosamen, Taher; Saket, Maisa
2009-06-01
About 10% of the gross domestic product in Jordan is spent on health care, and almost one third of that is spent on pharmaceuticals. The public health sector in Jordan has 4 main governmental parties that purchase medicines independently through annual tenders (ie, the process of bidding, being awarded, ordering, paying for, and receiving drugs) issued in the generic (or scientific) name of the medicines or therapeutic groups. Double purchasing is a problem that leads to higher spending on drugs and poor availability of medicines throughout the year. To remedy this problem, a joint procurement process was established in Jordan in 2004 and went into practice in 2006. The aim of this research was to assess the first year of purchasing pharmaceuticals in the public health sector in Jordan through the joint procurement process for the 4 participating parties in comparison with purchasing pharmaceuticals independently before the institution of joint procurement. The first tender under the joint procurement process was issued in 2007 for antibiotics, anti-HIV medications, and antituberculosis agents, which represent 15% of the annual pharmaceutical public-sector purchases in Jordan. A research committee solicited lists of purchased quantities and final purchase prices of these pharmaceuticals obtained in 2006 by each participating group and in 2007 through the joint procurement process. The quantity-comparison method was used to compare the costs of drugs purchased in 2006 and 2007, and estimated cost savings were calculated for each product for each party for 2006 and 2007 under the assumption that the same quantities purchased by each participating party in 2006 would be purchased through joint procurement (prices of 2007). Purchasing through the joint procurement process achieved an estimated savings of 2.4%. This savings increased to 8.9% after excluding 1 item (a cephalosporin), the raw material price of which increased markedly in 2007 compared with 2006 because of an international shortage of raw materials. Based on these initial findings, applying a joint procurement system for pharmaceuticals in the public health sector in Jordan has potential to reduce expenditures for the purchase of medicines and provide treatment continuously throughout the year.
7 CFR 1726.202 - Informal competitive bidding.
Code of Federal Regulations, 2010 CFR
2010-01-01
... persons or organizations on its qualified bidder list for the specific project (see § 1726.23). (b... a responsive bid. (d) Evaluation basis. Any factors, other than lowest dollar amount of the bid, which are to be considered in evaluating the proposals of qualified bidders (e.g., power consumption...
7 CFR 1753.8 - Contract construction procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... of all bids including “Buy American” evaluations, if any, and all other evaluations required by law... Contract construction procedures. (a) Sealed, competitive bidding—(1) Bid opening date. The borrower is responsible for scheduling the bid opening date. If RUS review of P&S is required by § 1753.7, the borrower...
10 CFR 452.5 - Bidding procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... cellulosic biofuels producers during the open window established in the solicitation. The open window shall.... (d) All bids will be confidential until 45 days after the close of the window for submission of bids... following: (1) After DOE evaluates the bids received during the open window, it shall, within 45 days...
Mukherjee, Pranab K; Chen, Huichao; Patton, Lauren L; Evans, Scott; Lee, Anthony; Kumwenda, Johnstone; Hakim, James; Masheto, Gaerolwe; Sawe, Frederick; Pho, Mai T; Freedberg, Kenneth A; Shiboski, Caroline H; Ghannoum, Mahmoud A; Salata, Robert A
2017-01-02
Compare the safety and efficacy of topical gentian violet with that of nystatin oral suspension (NYS) for the treatment of oropharyngeal candidiasis in HIV-1-infected adults in resource-limited settings. Multicenter, open-label, evaluator-blinded, randomized clinical trial at eight international sites, within the AIDS Clinical Trials Group. Adult HIV-infected participants with oropharyngeal candidiasis, stratified by CD4 cell counts and antiretroviral therapy status at study entry, were randomized to receive either gentian violet (0.00165%, BID) or NYS (500 000 units, QID) for 14 days. Cure or improvement after 14 days of treatment. Signs and symptoms of oropharyngeal candidiasis were evaluated in an evaluator-blinded manner. The study was closed early per Data Safety Monitoring Board after enrolling 221 participants (target = 494). Among the 182 participants eligible for efficacy analysis, 63 (68.5%) in the gentian violet arm had cure or improvement of oropharyngeal candidiasis versus 61 (67.8%) in the NYS arm, resulting in a nonsizable difference of 0.007 (95% confidence interval: -0.129, 0.143). There was no sizable difference in cure rates between the two arms (-0.0007; 95% confidence interval: -0.146, 0.131). No gentian violet-related adverse events were noted. No sizable differences were identified in tolerance, adherence, quality of life, or acceptability of study drugs. In gentian violet arm, 61 and 39% of participants reported 'no' and 'mild-to-moderate' staining, respectively. Cost for medication procurement was significantly lower for gentian violet versus NYS (median $2.51 and 19.42, respectively, P = 0.01). Efficacy of gentian violet was not statistically different than NYS, was well tolerated, and its procurement cost was substantially less than NYS.
Mukherjee, Pranab K; Chen, Huichao; Patton, Lauren L; Evans, Scott; Lee, Anthony; Kumwenda, Johnstone; Hakim, James; Masheto, Gaerolwe; Sawe, Frederick; Pho, Mai T; Freedberg, Kenneth A; Shiboski, Caroline H; Ghannoum, Mahmoud A; Salata, Robert A
2016-01-01
Objective Compare the safety and efficacy of topical gentian violet (GV) to that of nystatin oral suspension (NYS) for the treatment of oropharyngeal candidiasis (OC) in HIV-1 infected adults in resource-limited settings. Design Multicenter, open-label, evaluator-blinded, randomized clinical trial at 8 international sites, within the AIDS Clinical Trials Group. Study participants and Intervention Adult HIV-infected participants with OC, stratified by CD4 cell counts and antiretroviral therapy status at study entry, were randomized to receive either GV (0.00165%, BID) or NYS (500,000 units, QID) for 14 days. Main outcome measure(s) Cure or improvement after 14 days of treatment. Signs and symptoms of OC were evaluated in an evaluator-blinded manner. Results The study was closed early per DSMB after enrolling 221 participants (target = 494). Among the 182 participants eligible for efficacy analysis, 63 (68.5%) in the GV arm had cure or improvement of OC versus 61 (67.8%) in the NYS arm, resulting in a non-sizable difference of 0.007 (95% CI: -0.129, 0.143). There was no sizable difference in cure rates between the two arms (-0.0007; 95% CI: -0.146, 0.131). No GV-related adverse events were noted. No sizable differences were identified in tolerance, adherence, quality of life, or acceptability of study drugs. In GV arm, 61% and 39% of participants reported “no” and “mild-to-moderate” staining, respectively. Cost for medication procurement was significantly lower for GV versus NYS [Median $2.51 and $19.42, respectively, P = 0.01]. Conclusions Efficacy of GV was not statistically different than NYS, was well-tolerated, and its procurement cost was substantially less than NYS. PMID:27677161
Bid purchasing of pharmaceuticals.
Swift, R G; Ryan, M R
1978-11-01
The effects of bid purchasing of drug products by hospitals and the factors to consider in bid purchasing of pharmaceuticals are reviewed; further, the prices available with bid purchasing to a specific hospital in 1974 and 1977 are presented. Factors important for a successful bid purchasing system of pharmaceuticals are: (1) use of a formulary policy, (2) an effective procedure for handling bid purchasing and (3) criteria for evaluation of drug products. Significant differences were found between prices available with and without bid purchasing for 50 nonproprietary drug products in 1974 and for 19 products in 1977. Although monetary savings to hospitals do exist with bid purchasing of pharmaceuticals, the degree of savings is dependent upon the drug usage for that hospital.
48 CFR 811.104-74 - Bid evaluation and award.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 811.104-74 Bid evaluation and award. (a) A bid offering products that differ from brand name products referenced in a “brand name or equal” purchase description must be considered for award if the contracting officer determines in accordance with the terms of the clause at 852.211-73, Brand name or equal, that the...
76 FR 73654 - Notice of Single Family Loan Sales (SFLS 2012-1)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-29
... will evaluate the bids submitted and determine the successful bid, in terms of the best value to HUD... Sales (SFLS 2012-1) AGENCY: Office of the Assistant Secretary for Housing--Federal Housing Commissioner... describes the bidding process for the sale and certain persons who are ineligible to bid. This first sale of...
76 FR 55936 - Notice of Single Family Loan Sales (SFLS 2011-3)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-09
... will evaluate the bids submitted and determine the successful bid, in terms of the best value to HUD... Sales (SFLS 2011-3) AGENCY: Office of the Assistant Secretary for Housing--Federal Housing Commissioner... describes the bidding process for the sale and certain persons who are ineligible to bid. This third sale of...
A Technique for Evaluating Vendor Bids for Stock Replenishment of a Consumable Item.
1985-06-01
RD-A159 957 A TECHNIQUE FOR EVALUATING VENDOR BIDS FOR STOCK 1/1 REPLENISHMENT OF A CONSUMABLE I TEM(U) NAVAL POSTGRADUATE SCHOOL MONTEREY CA J...REPORT II PER106 COVERED *A Technique for Evaluating Vendor Bids Juner’ 1985 i for Stock Replenishment of a Consumable tern 6. PERFORMING ORG. REPORT...Control Center (SPCC) Uniform Inventory Control Program (UICP) wholesale replenishment model for 1H cognizance symbol ( consumable ) material is an order
Douglas, Thomas M; Douglas, Nicholas M
2009-10-01
New Zealand's organ donation rates are among the lowest in the OECD. In a bid to increase organ availability, the New Zealand Human Tissue Act 2008 introduces new consent arrangements for deceased donor organ procurement. This article assesses these new arrangements and presents the case for further reform. Our assessment and arguments are based on philosophical analysis informed by empirical data on the effectiveness of alternative consent systems. We: 1) Identify widely held ethical judgments about policies and practices relevant to organ donation (e.g. those relating to coronial post-mortems), 2) Assess the implications of these judgments for the Human Tissue Act and the assumptions that underpin it, and 3) Derive policy recommendations that are consistent with the judgments. The Human Tissue Act 2008 retains a strong consent requirement for organ procurement: organs may not be transplanted unless either the deceased or the family consents. We argue that organ availability could and should be increased by shifting from a model that requires consent to one that requires the absence of significant dissent. We recommend that New Zealand adopt either 1) an organ donation system similar to the existing system for ordering coronial post-mortems, or 2) a variant of the 'opt-out' system already in place in several other countries.
Three essays on auction markets
NASA Astrophysics Data System (ADS)
Shunda, Nicholas James
This dissertation contains a series of theoretical investigations of auction markets. The essays it contains cover wholesale electricity markets, a popular selling mechanism on eBay, and supplier entry into multi-unit procurement auctions. The study in Chapter 1 compares the procurement cost-minimizing and productive efficiency performance of the auction mechanism used by independent system operators in wholesale electricity auction markets in the U.S. with that of a proposed alternative. The current practice allocates energy contracts as if the auction featured a discriminatory final payment method when, in fact, the markets are uniform price auctions. The proposed alternative explicitly accounts for the market-clearing price during the allocation phase. We find that the proposed alternative largely outperforms the current practice on the basis of procurement costs in the context of simple auction markets featuring both day-ahead and real-time auctions and that the procurement cost advantage of the alternative is complete when we simulate the effects of increased competition. We also find that a tradeoff between the objectives of procurement cost minimization and productive efficiency emerges in our simple auction markets and persists in the face of increased competition. The study in Chapter 2 considers a possible rationale for an auction with a buy price. In an auction with a buy price, the seller provides bidders with an option to end the auction early by accepting a transaction at a posted price. The "Buy-It-Now" option on eBay is a leading example of an auction with a buy price. The study develops a model of an auction with a buy price in which bidders use the auction's reserve price and buy price to formulate a reference price. The model both explains why a revenue-maximizing seller would want to augment her auction with a buy price and demonstrates that the seller sets a higher reserve price when she can affect the bidders' reference price through the auction's reserve price and buy price than when she can affect the bidders' reference price through the auction's reserve price only. Introducing a small reference-price effect can shrink the range of buy prices bidders are willing to exercise. The comparative statics properties of bidding behavior are in sharp contrast to equilibrium behavior in other models where the existence and size of the auction's buy price have no effect on bidding behavior. The study in Chapter 3 investigates endogenous entry in multi-unit auctions. We formulate and study models of multi-unit discriminatory and uniform price auctions and investigate the entry incentives and procurement costs they generate in equilibrium. We study two types of endogenous entry: in auctions with "interim entry costs," suppliers know their private cost information before deciding whether or not to undertake entry; in auctions with ex ante entry costs, suppliers do not know their private cost information before deciding whether or not to enter. The discriminatory and uniform price auctions are efficient and procurement cost equivalent in all the environments we study. With interim entry costs, the two auctions provide identical entry incentives. In contrast, with ex ante entry costs, suppliers enter the discriminatory auction at a higher rate than they enter the uniform price auction.
Body Image Disturbance in 1000 Male Appearance and Performance Enhancing Drug Users
Hildebrandt, Tom; Alfano, Lauren; Langenbucher, James W.
2010-01-01
Body image disturbance (BID) among men has only recently become a phenomenon of clinical significance with noted heterogeneity in the behavioral consequences of these disturbances. The degree of heterogeneity among appearance and performance enhancing drug (APED) users is unknown and an empirically derived framework for studying BID is necessary. 1000 APED users were recruited via the Internet and they completed a comprehensive online assessment APED use patterns, motivations, consequences, and BID. Data were evaluated using latent trait, latent class, and factor mixture models. Model results were validated using a range of covariates including cycle characteristics, age, APED history, and APED risk. A 1-Factor, 4-Class model provided the best fit to the data with Class 1 scoring the highest on all measures of BID and Class 4 the lowest on all measures. Class 2 differed in their preference for being lean over muscular and Class 3 preferred adding mass and size. Each class was associated with unique risks, APED history, and training identity. Not all APED users suffer from significant BID and there are unique profiles for those with elevated BID. Future research on male BID should account for this structure in order to better define relevant diagnostic categories and evaluate the clinical significance of BID. PMID:20110092
2010-04-30
regarding production capabilities and costs, but must somehow form beliefs about the likelihood of a bid being accepted. We facilitate formulation...which both vendors believe the buyer places equal weight on the two attributes, but the vendors differ in their capabilities of producing those...exchange—the future of B2B . Harvard Business Review, 78(6), 86-96. = ^Åèìáëáíáçå=oÉëÉ~êÅÜ=mêçÖê~ã= do^ar^qb=p`elli=lc=_rpfkbpp=C=mr_if`=mlif`v= 444= k^s^i
47 CFR 1.2202 - Competitive bidding design options.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 1.2202 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Grants...) Procedures that utilize mathematical computer optimization software, such as integer programming, to evaluate... evaluating bids using a ranking based on specified factors. (B) Procedures that combine computer optimization...
48 CFR 552.236-73 - Basis of Award-Construction Contract.
Code of Federal Regulations, 2010 CFR
2010-10-01
... applicable number of units shown on the bid form) plus (2) all options designated to be evaluated. The... applicable number of units shown on the bid form) plus (2) those alternates in the order of priority listed.... For example, when the amount available is $100,000 and a bidder's base bid is $85,000, with its...
Franchina, Flavio A; Maimone, Mariarosa; Sciarrone, Danilo; Purcaro, Giorgia; Tranchida, Peter Q; Mondello, Luigi
2015-07-10
The present research is focused on the use and evaluation of a novel helium ionization detector, defined as barrier discharge ionization detector (BID), within the context of (low-)flow modulation comprehensive two-dimensional gas chromatography (FM GC×GC). The performance of the BID device was compared to that of a flame ionization detector (FID), under similar FM GC×GC conditions. Following development and optimization of the FM GC×GC method, the BID was subjected to fine tuning in relation to acquisition frequency and discharge flow. Moreover, the BID performance was measured and compared to that of the FID, in terms of extra-column band broadening, sensitivity and dynamic range. The comparative study was carried out by using standard compounds belonging to different chemical classes, along with a sample of diesel fuel. Advantages and disadvantages of the BID system, also within the context of FM GC×GC, are critically discussed. In general, the BID system was characterized by a more limited dynamic range and increased sensitivity, compared to the FID. Additionally, BID and FID contribution to band broadening was found to be similar under the operational conditions applied. Particular attention was devoted to the behaviour of the FM GC×GC-BID system toward saturated and aromatic hydrocarbons, for a possible future use in the field of mineral-oil food contamination research. Copyright © 2015 Elsevier B.V. All rights reserved.
Li, Xiaoyan; Keshishian, Allison; Hamilton, Melissa; Horblyuk, Ruslan; Gupta, Kiran; Luo, Xuemei; Mardekian, Jack; Friend, Keith; Nadkarni, Anagha; Pan, Xianying; Lip, Gregory Y H; Deitelzweig, Steve
2018-01-01
Prior real-world studies have shown that apixaban is associated with a reduced risk of stroke/systemic embolism (stroke/SE) and major bleeding versus warfarin. However, few studies evaluated the effectiveness and safety of apixaban according to its dosage, and most studies contained limited numbers of patients prescribed 2.5 mg twice-daily (BID) apixaban. Using pooled data from 4 American claims database sources, baseline characteristics and outcomes for patients prescribed 5 mg BID and 2.5 mg BID apixaban versus warfarin were compared. After 1:1 propensity-score matching, 31,827 5 mg BID apixaban-matched warfarin patients and 6600 2.5 mg BID apixaban-matched warfarin patients were identified. Patients prescribed 2.5 mg BID apixaban were older, had clinically more severe comorbidities, and were more likely to have a history of stroke and bleeding compared with 5 mg BID apixaban patients. Compared with warfarin, 5 mg BID apixaban was associated with a lower risk of stroke/SE (hazard ratio [HR]: 0.70, 95% confidence interval [CI]: 0.60-0.81) and major bleeding (HR: 0.59, 95% CI: 0.53-0.66). Compared with warfarin, 2.5 mg BID apixaban was also associated with a lower risk of stroke/SE (HR: 0.63, 95% CI: 0.49-0.81) and major bleeding (HR: 0.59, 95% CI: 0.49-0.71). In this real-world study, both apixaban doses were assessed in 2 patient groups differing in age and clinical characteristics. Each apixaban dose was associated with a lower risk of stroke/SE and major bleeding compared with warfarin in the distinct population for which it is being prescribed in United States clinical practice. Clinicaltrials.Gov Identifier: NCT03087487.
Robust Multi-unit Auction Protocol against False-name Bids
NASA Astrophysics Data System (ADS)
Yokoo, Makoto; Sakurai, Yuko; Matsubara, Shigeo
This paper presents a new multi-unit auction protocol (IR protocol) that is robust against false-name bids. Internet auctions have become an integral part of Electronic Commerce and a promising field for applying agent and Artificial Intelligence technologies. Although the Internet provides an excellent infrastructure for executing auctions, the possibility of a new type of cheating called false-name bids has been pointed out. A false-name bid is a bid submitted under a fictitious name. A protocol called LDS has been developed for combinatorial auctions of multiple different items and has proven to be robust against false-name bids. Although we can modify the LDS protocol to handle multi-unit auctions, in which multiple units of an identical item are auctioned, the protocol is complicated and requires the auctioneer to carefully pre-determine the combination of bundles to obtain a high social surplus or revenue. For the auctioneer, our newly developed IR protocol is easier to use than the LDS, since the combination of bundles is automatically determined in a flexible manner according to the declared evaluation values of agents. The evaluation results show that the IR protocol can obtain a better social surplus than that obtained by the LDS protocol.
A False-name-Proof Double Auction Protocol for Arbitrary Evaluation Values
NASA Astrophysics Data System (ADS)
Sakurai, Yuko; Yokoo, Makoto
We develop a new false-name-proof double auction protocol called the Generalized Threshold Price Double auction (GTPD) protocol. False-name-proofness generalizes strategy-proofness by incorporating the possibility of false-name bids, e.g., bids submitted using multiple e-mail addresses. An existing protocol called TPD protocol is false-name-proof but can handle only the cases where marginal utilities of each agent always decrease, while our new GTPD protocol can handle arbitrary evaluation values. When marginal utilities can increase, some bids cannot be divided into a single unit (e.g., an all-or-nothing bid). Due to the existence of such indivisible bids, meeting supply/demand becomes difficult. Furthermore, a seller/buyer can submit a false-name-bid by pretending to be a potential buyer/seller to manipulate allocations and payments. In the GTPD protocol, the auctioneer is required to absorb the supply-demand imbalance up to a given upper-bound. Also, the GTPD incorporate a new false-name-proof one-sided auction protocol that is guaranteed to sell/buy a certain number of units. Simulation results show that when the threshold price is set appropriately, this protocol can obtain a good social surplus, and the number of absorbed units is much smaller than the given upper-bound.
NASA Astrophysics Data System (ADS)
Fujishima, Hirohide; Yanase, Norihiko
About 70% of local governments in Japan, endeavored to introduce overall evaluation bidding method for their public works in 2011 and each authority ordered one or some projects in according to the new bidding process. That is, their enforcement was an only trial level and they say that the reason why is long-term procedure and heavily administrative load of the system. The author think that such burden has relationship of human affairs of local govern ments, practical problems on kinds and price of constructions and the officers' experience on the new bidding method. The aim of this study is to analyze such problems among the officers' profession, posts and experience of administrative matter by statistical data, questionnaire and hearing to the officers. The result could indicate that a group of small local governments uses the method appropriately and that another group of medium-sized rejects to increase more contracts in according to the new bidding system because of unbalance between the stuffs' ability and order quantity of public works.
Ravandi, Farhad; Gojo, Ivana; Patnaik, Mrinal M.; Minden, Mark D.; Kantarjian, Hagop; Johnson-Levonas, Amy O.; Fancourt, Craig; Lam, Raymond; Jones, Mary Beth; Knox, Clayton D.; Rose, Shelonitda; Patel, Payal Shah; Tibes, Raoul
2017-01-01
Objective Evaluate safety/tolerability/efficacy of MK-8242 in subjects with refractory/recurrent AML. Methods MK-8242 was dosed p.o. QD (30–250 mg) or BID (120–250 mg) for 7on/7off in 28-day cycle. Dosing was modified to 7on/14off, in 21-day cycle (210 or 300 mg BID). Results 26 subjects enrolled (24 evaluable for response); 5/26 discontinued due to AEs. There were 7 deaths; 1 (fungal pneumonia due to marrow aplasia) possibly drug-related. With the 7on/7off regimen, 2 subjects had DLTs in the 250 mg BID group (both bone marrow failure and prolonged cytopenia). With the 7on/14off, no DLTs were observed in 210 mg BID or 300 mg BID (doses >300 mg not tested). Best responses were: 1/24 PR (11 weeks;120 mg QD, 7on/7off); 1/24 CRi (2 weeks;210 mg BID, 7on/14off); 1/24 morphologic leukemia-free state (4 weeks; 250 mg BID, 7on/7off). PK on Day7 at 210 mg BID revealed AUC0-12hr 8.7 μM*hr, Cmax 1.5 μM (n=5, Tmax, 2–6 hr), T1/2 7.9 hr, CLss/F 28.8 L/hr, and Vss/F 317 L. Conclusions The 7on/14off regimen showed a more favorable safety profile; no MTD was established. Efficacy was seen using both regimens providing impetus for further study of HDM2 inhibitors in subjects with AML. PMID:27544076
NASA Astrophysics Data System (ADS)
Alard, Robert; Gustafsson, Martin; Nienhaus, Jörg
The management of buyer-supplier relations is a major topic for many enterprises today. Modern Information and Communication Technologies (ICT) offer interesting perspectives on opportunities and implementation approaches. Today, logistics and procurement departments of numerous enterprises are evaluating the possibilities and opportunities of new ICT solutions and especially of internet-based electronic procurement solutions for the optimisation and re-engineering of their buyer-supplier relationships. Due to the highly innovative character of the new ICT solutions and the scarcely available operational examples in the industry, only little guidance exists to support responsible managers during the evaluation, planning and designing of internet-based electronic procurement solutions. This paper describes a framework for the strategic evaluation and planning of the deployment of internet-based procurement solutions for direct materials. The presented approach supports enterprises in the analysis of procurement objects and procurement structuring, in the definition and management of buyer-supplier-relationships, in the requirements analysis of ICT solutions as well as the assessment of the potential to support procurement with innovative ICT and internet-based electronic procurement solutions.
Keshishian, Allison; Hamilton, Melissa; Horblyuk, Ruslan; Gupta, Kiran; Luo, Xuemei; Mardekian, Jack; Friend, Keith; Nadkarni, Anagha; Pan, Xianying; Lip, Gregory Y. H.; Deitelzweig, Steve
2018-01-01
Prior real-world studies have shown that apixaban is associated with a reduced risk of stroke/systemic embolism (stroke/SE) and major bleeding versus warfarin. However, few studies evaluated the effectiveness and safety of apixaban according to its dosage, and most studies contained limited numbers of patients prescribed 2.5 mg twice-daily (BID) apixaban. Using pooled data from 4 American claims database sources, baseline characteristics and outcomes for patients prescribed 5 mg BID and 2.5 mg BID apixaban versus warfarin were compared. After 1:1 propensity-score matching, 31,827 5 mg BID apixaban-matched warfarin patients and 6600 2.5 mg BID apixaban-matched warfarin patients were identified. Patients prescribed 2.5 mg BID apixaban were older, had clinically more severe comorbidities, and were more likely to have a history of stroke and bleeding compared with 5 mg BID apixaban patients. Compared with warfarin, 5 mg BID apixaban was associated with a lower risk of stroke/SE (hazard ratio [HR]: 0.70, 95% confidence interval [CI]: 0.60–0.81) and major bleeding (HR: 0.59, 95% CI: 0.53–0.66). Compared with warfarin, 2.5 mg BID apixaban was also associated with a lower risk of stroke/SE (HR: 0.63, 95% CI: 0.49–0.81) and major bleeding (HR: 0.59, 95% CI: 0.49–0.71). In this real-world study, both apixaban doses were assessed in 2 patient groups differing in age and clinical characteristics. Each apixaban dose was associated with a lower risk of stroke/SE and major bleeding compared with warfarin in the distinct population for which it is being prescribed in United States clinical practice. Trial registration: Clinicaltrials.Gov Identifier: NCT03087487. PMID:29373602
Landbloom, Ronald; Mackle, Mary; Wu, Xiao; Kelly, Linda; Snow-Adami, Linda; McIntyre, Roger S; Mathews, Maju; Hundt, Carla
2017-08-01
Evaluate the efficacy and safety of asenapine 2.5 mg twice daily (bid; n=97) or 5 mg bid (n=113) versus placebo (n=101) in adults with acute exacerbation of schizophrenia. Adults with Diagnostic and Statistical Manual of Mental Disorders, Fourth Edition, Text Revision (DSM-IV-TR) schizophrenia diagnosis were randomized to asenapine 2.5 mg bid, 5 mg bid, placebo, or olanzapine 15 mg once daily. The primary objective was to test superiority of asenapine versus placebo as measured by the change from baseline to day 42 in the Positive and Negative Syndrome Scale (PANSS) total score. The key safety objective was to evaluate weight change in asenapine versus olanzapine at day 42. The primary efficacy endpoint was met; the difference in least squares mean change from baseline to day 42 in PANSS total score between asenapine 5 mg bid and placebo was -5.5 points (unadjusted 95% CI: -10.1, -1.0; multiplicity adjusted P=0.0356). Neither asenapine 2.5 mg bid nor olanzapine 15mg were superior to placebo. Both asenapine groups demonstrated significantly less weight gain than olanzapine at day 42. Significantly higher incidences of oral hypoesthesia and dysgeusia (combined) for asenapine 2.5 mg bid (5.2% vs 0.0%; P=0.0217) and 5 mg bid (7.1% vs 0.0%; P=0.0033) were observed versus placebo. There were no significant differences between asenapine and placebo for insomnia, extrapyramidal symptoms, akathisia, dizziness, or combination of somnolence/sedation/hypersomnia. This study supports previous efficacy and safety findings of asenapine; asenapine 5 mg bid is the lowest effective dose in adults with schizophrenia. Asenapine was associated with significantly less weight gain than olanzapine at day 42.
23 CFR 172.5 - Methods of procurement.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated... negotiation. Contracting agencies shall use competitive negotiation for the procurement of engineering and...
Martin, Nellie Anne; Bonner, Helena; Elkjær, Maria Louise; D’Orsi, Beatrice; Chen, Gang; König, Hans Georg; Svensson, Martina; Deierborg, Tomas; Pfeiffer, Shona; Prehn, Jochen H.; Lambertsen, Kate Lykke
2016-01-01
The BH3 interacting-domain death agonist (BID) is a pro-apoptotic protein involved in death receptor-induced and mitochondria-mediated apoptosis. Recently, it has also been suggested that BID is involved in the regulation of inflammatory responses in the central nervous system. We found that BID deficiency protected organotypic hippocampal slice cultures in vitro from neuronal injury induced by oxygen-glucose deprivation. In vivo, BID-knockout (KO) mice and wild type (WT) mice were subjected to 60 min of transient middle cerebral artery occlusion (tMCAO) to induce focal cerebral ischemia, and allowed to recover for 24 h. Infarct volumes and functional outcome were assessed and the inflammatory response was evaluated using immunofluorescence, Western blotting, quantitative PCR (qPCR) and Mesoscale multiplex analysis. We observed no difference in the infarct volume or neurological outcome between BID-KO and WT mice. The inflammatory response was reduced by BID deficiency as indicated by a change in microglial/leukocyte response. In conclusion, our data suggest that BID deficiency is neuroprotective in an in vitro model and modulates the inflammatory response to focal cerebral ischemia in vivo. However, this is not translated into a robust neuroprotection in vivo. PMID:26869884
A Framework for Usability Evaluation in EHR Procurement.
Tyllinen, Mari; Kaipio, Johanna; Lääveri, Tinja
2018-01-01
Usability should be considered already by the procuring organizations when selecting future systems. In this paper, we present a framework for usability evaluation during electronic health record (EHR) system procurement. We describe the objectives of the evaluation, the procedure, selected usability attributes and the evaluation methods to measure them. We also present the emphasis usability had in the selection process. We do not elaborate on the details of the results, the application of methods or gathering of data. Instead we focus on the components of the framework to inform and give an example to other similar procurement projects.
Vargas, Cristian; Pineda, Julián; Calvo, Víctor; López-Jaramillo, Carlos
2014-01-01
As there are still doubts about brain connectivity in type I bipolar disorder (BID), resting-state functional magnetic resonance imaging (RS-fMRI) studies are necessary during euthymia for a better control of confounding factors. To evaluate the differences in brain activation between euthymic BID patients and control subjects using resting state- functional-magnetic resonance imaging (RS-fMRI), and to identify the lithium effect in these activations. A cross-sectional study was conducted on 21 BID patients (10 receiving lithium only, and 11 non-medicated) and 12 healthy control subjects, using RS fMRI and independent component analysis (ICA). Increased activation was found in the right hippocampus (P=.049) and posterior cingulate (P=.040) within the Default Mode Network (DMN) when BID and control group were compared. No statistically significant differences were identified between BID on lithium only therapy and non-medicated BID patients. The results suggest that there are changes in brain activation and connectivity in BID even during euthymic phase and mainly within the DMN network, which could be relevant in affect regulation. Copyright © 2013 Asociación Colombiana de Psiquiatría. Publicado por Elsevier España. All rights reserved.
Tyllinen, Mari; Kaipio, Johanna; Lääveri, Tinja; Nieminen, Marko
2017-01-01
This paper describes the development of a questionnaire for evaluating usability during EHR system procurement (DPUQ). Established usability questionnaires can be used to gather user feedback after using the systems. However, during procurement, experimenting with real system use is practical only with a limited number of system candidates. There is a need for less resource-demanding usability evaluation in the early stages of procurement in cases with several vendors. DPUQ has been designed for usability evaluation by end-users during special scenario-based vendor demonstrations. The questionnaire includes three sets of questions to be used during and after the vendor demonstration. DPUQ delivers specific usability scores and can be used to compare system candidates in procurement complementing other evaluation methods.
1984-03-01
with GAO; GAO sustained only 1. The Maybank Amendment also complicates both the bidding and award process. Normally, the DoD Appropriation Act...precludes DoD from paying a price differential on contracts awarded for labor surplus area (LSA) set-asides. This restriction, known as the Maybank Amendment...personnel believe that the frequency of bid protests has increased as a consequence of the bidding complica- tions introduced by the Maybank revision
Cosme, Angel; Montes, Milagrosa; Ibarra, Begoña; Tamayo, Esther; Alonso, Horacio; Mendarte, Usua; Lizasoan, Jacobo; Herreros-Villanueva, Marta; Bujanda, Luis
2017-05-14
To evaluate the efficacy of antimicrobial susceptibility-guided therapy before first-line treatment for infection in patients with dual or triple antibiotic resistance. A total of 1034 patients infected by Helicobacter pylori ( H. pylori ) during 2013-2014 were tested for antimicrobial susceptibility. 157 of 1034 (15%) patients showed resistance to two (127/1034; 12%) and to three (30/1034; 3%) antibiotics. Sixty-eight patients with dual H. pylori -resistance (clarithromycin, metronidazole or levofloxacin) were treated for 10 d with triple therapies: OAL (omeprazole 20 mg b.i.d., amoxicillin 1 g b.i.d., and levofloxacin 500 mg b.i.d.) 43 cases, OAM (omeprazole 20 mg b.i.d., amoxicillin 1 g b.i.d., and metronidazole 500 mg b.i.d.) 12 cases and OAC (omeprazole 20 mg b.id., amoxicillin 1 g b.i.d., and clarithromycin 500 mg b.i.d.) 13 cases based on the antimicrobial susceptibility testing. Twelve patients showed triple H. pylori -resistance (clarithromycin, metronidazole and levofloxacin) and received for 10 d triple therapy with OAR (omeprazole 20 mg b.id., amoxicillin 1 g b.i.d., and rifabutin 150 mg b.i.d.). Eradication was confirmed by 13C-urea breath test. Adverse effects and compliance were assessed by a questionnaire. Intention-to-treat eradication rates were: OAL (97.6%), OAM (91.6%), OAC (92.3%) and OAR (58.3%). Cure rate was significantly higher in naïve patients treated with OAR-10 compared to patients who had two or three previous treatment failures (83% vs 33%). Adverse events rates for OAL, OAM, OAC and OAR were 22%, 25%, 23% and 17%, respectively, all of them mild-moderate. Antimicrobial susceptibility-guided triple therapies during 10 d for first-line treatment leads to an eradication rate superior to 90% in patients with dual antibiotic H. pylori resistance.
Ullmann, A. J.; Cornely, O. A.; Burchardt, A.; Hachem, R.; Kontoyiannis, D. P.; Töpelt, K.; Courtney, R.; Wexler, D.; Krishna, G.; Martinho, M.; Corcoran, G.; Raad, I.
2006-01-01
The pharmacokinetic profiles, safety, and efficacies of different dosing schedules of posaconazole oral suspension in patients with possible, probable, and proven refractory invasive fungal infection (rIFI) or febrile neutropenia (FN) were evaluated in a multicenter, open-label, parallel-group study. Sixty-six patients with FN and 32 patients with rIFI were randomly assigned to one of three posaconazole regimens: 200 mg four times a day (q.i.d.) for nine doses, followed by 400 mg twice a day (b.i.d.); 400 mg q.i.d. for nine doses, followed by 600 mg b.i.d.; or 800 mg b.i.d. for five doses, followed by 800 mg once a day (q.d.). Therapy was continued for up to 6 months in patients with rIFI or until neutrophil recovery occurred in patients with FN. The 400-mg-b.i.d. dose provided the highest overall mean exposure, with 135% (P = 0.0004) and 182% (P < 0.0001) greater exposure than the 600-mg-b.i.d. and 800-mg-q.d. doses, respectively. However, exposure in allogeneic bone marrow transplant (BMT) recipients (n = 12) was 52% lower than in non-BMT patients. Treatment-related adverse events (occurring in 24% of patients) were mostly gastrointestinal in nature. Twenty-four percent of patients had adverse events leading to premature discontinuation (none were treatment related). In efficacy-evaluable patients, successful clinical response was observed in 43% with rIFI (56% of patients receiving 400 mg b.i.d., 17% receiving 600 mg b.i.d., and 50% receiving 800 mg q.d.) and 77% with FN (74% receiving 400 mg b.i.d., 78% receiving 600 mg b.i.d., and 81% receiving 800 mg q.d.). Posaconazole is well tolerated and absorbed. Divided doses of 800 mg (400 mg b.i.d.) provide the greatest posaconazole exposure. PMID:16436724
Teng, Renli; Maya, Juan; Butler, Kathleen
2013-01-01
The results of two independent, randomized, two-period crossover, single-center studies, conducted to assess the pharmacokinetics of ticagrelor ± aspirin, inhibition of platelet aggregation (IPA) with ticagrelor/aspirin vs. clopidogrel/aspirin, and safety, tolerability, and bleeding times are reported here. In Study A (open-label), 16 volunteers received ticagrelor (50 mg bid Days 1-5; 200 mg bid Days 6-9; one 200 mg dose on Day 10) ± 300 mg qd aspirin (Days 1-10). In Study B (double-blind, double-dummy), 16 volunteers received aspirin (300 mg loading dose/75 mg qd Days 2-9) with either ticagrelor (200 mg bid Days 4-8, one 200 mg dose on Day 9) or clopidogrel (300 mg loading dose Day 4, 75 mg qd Days 5-9). At steady-state ticagrelor (50 mg bid, or 200 mg bid), concomitant aspirin (300 mg qd) had no effect on mean maximum plasma concentration (Cmax), median time to Cmax (tmax), or mean area under the plasma concentration-time curve for the dosing interval (AUC0-τ) for ticagrelor and its primary metabolite, AR-C124910XX. Following 200 mg bid ticagrelor, mean Cmax and AUC0-τ for both parent and metabolite were comparable with co-administration of aspirin at 75 mg and 300 mg qd. Aspirin (300 mg qd) had no effect on IPA (ADP-induced) by ticagrelor. However, aspirin and ticagrelor had an additive effect on IPA (collagen-induced). Ticagrelor/aspirin increased bleeding times vs. baseline. Ticagrelor/aspirin co-administration was well tolerated at all dose combinations evaluated. In summary, the findings of this study demonstrate that co-administration of aspirin (300 mg qd) with ticagrelor (50 mg bid, or 200 mg bid) had no effect on ticagrelor pharmacokinetics or IPA (ADP-induced) by ticagrelor.
Optimal strategies for electric energy contract decision making
NASA Astrophysics Data System (ADS)
Song, Haili
2000-10-01
The power industry restructuring in various countries in recent years has created an environment where trading of electric energy is conducted in a market environment. In such an environment, electric power companies compete for the market share through spot and bilateral markets. Being profit driven, electric power companies need to make decisions on spot market bidding, contract evaluation, and risk management. New methods and software tools are required to meet these upcoming needs. In this research, bidding strategy and contract pricing are studied from a market participant's viewpoint; new methods are developed to guide a market participant in spot and bilateral market operation. A supplier's spot market bidding decision is studied. Stochastic optimization is formulated to calculate a supplier's optimal bids in a single time period. This decision making problem is also formulated as a Markov Decision Process. All the competitors are represented by their bidding parameters with corresponding probabilities. A systematic method is developed to calculate transition probabilities and rewards. The optimal strategy is calculated to maximize the expected reward over a planning horizon. Besides the spot market, a power producer can also trade in the bilateral markets. Bidding strategies in a bilateral market are studied with game theory techniques. Necessary and sufficient conditions of Nash Equilibrium (NE) bidding strategy are derived based on the generators' cost and the loads' willingness to pay. The study shows that in any NE, market efficiency is achieved. Furthermore, all Nash equilibria are revenue equivalent for the generators. The pricing of "Flexible" contracts, which allow delivery flexibility over a period of time with a fixed total amount of electricity to be delivered, is analyzed based on the no-arbitrage pricing principle. The proposed algorithm calculates the price based on the optimality condition of the stochastic optimization formulation. Simulation examples illustrate the tradeoffs between prices and scheduling flexibility. Spot bidding and contract pricing are not independent decision processes. The interaction between spot bidding and contract evaluation is demonstrated with game theory equilibrium model and market simulation results. It leads to the conclusion that a market participant's contract decision making needs to be further investigated as an integrated optimization formulation.
48 CFR 252.247-7008 - Evaluation of bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
....247-7008 Section 252.247-7008 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of... accomplishment of any item in the bid schedule, the Offeror shall include in the unit price any costs for bridge...
48 CFR 252.247-7008 - Evaluation of bids.
Code of Federal Regulations, 2011 CFR
2011-10-01
....247-7008 Section 252.247-7008 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of... accomplishment of any item in the bid schedule, the Offeror shall include in the unit price any costs for bridge...
48 CFR 252.247-7008 - Evaluation of bids.
Code of Federal Regulations, 2013 CFR
2013-10-01
....247-7008 Section 252.247-7008 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of... accomplishment of any item in the bid schedule, the Offeror shall include in the unit price any costs for bridge...
48 CFR 252.247-7008 - Evaluation of bids.
Code of Federal Regulations, 2012 CFR
2012-10-01
....247-7008 Section 252.247-7008 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of... accomplishment of any item in the bid schedule, the Offeror shall include in the unit price any costs for bridge...
23 CFR 172.5 - Methods of procurement.
Code of Federal Regulations, 2010 CFR
2010-04-01
... proposal solicitation (project, task, or service) process shall be by public announcement, advertisement... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated...
Long-Term Implications of the 2016 Future Years Defense Program
2016-01-01
operation and maintenance activities; acquisition includes research, development, test, and evaluation as well as procurement of weapon systems and other...group includes procurement and research, development, test, and evaluation (RDT&E). Appropriations for procurement fund the purchase of new weapon...and Evaluation Military Construction Family Housing OCO Funding Actual FYDP Period Beyond the FYDP PeriodDoD’s Estimates For 2017 through 2020 DoD
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Step one. 14.503-1 Section... AND CONTRACT TYPES SEALED BIDDING Two-Step Sealed Bidding 14.503-1 Step one. (a) Requests for... use the two step method. (3) The requirements of the technical proposal. (4) The evaluation criteria...
Report on the Audit of the Procurement of the Combined Arms Training-Integrated Evaluation System
1990-05-23
This is our final report on the Audit of the Procurement of the Combined Arms Training-Integrated Evaluation System (CATIES). We made the audit from...January through September 1989 in response to a Hotline complaint alleging irregularities in the procurement of CATIES. The audit objectives were to
An evaluation of transit procurement training.
Noland, Robert B; Weiner, Marc D; Klein, Nicholas J; Puniello, Orin D
2017-04-01
We evaluated a training course called "Orientation to Transit Procurement", designed and conducted by the National Transit Institute. This course is designed to provide Federal Transit Administration (FTA) grantees an overview of regulations and best practices related to the procurement process. Our objective in conducting the evaluation was to understand how transit agency staff made changes in procurement practices in response to the course training. The evaluation was mixed mode: an Internet survey followed by in-depth interviews with a small group of respondents. Survey respondents were also provided with an open-ended question providing us with additional context for our evaluation. Results show that the training is substantially successful at meeting the goal of improving procurement practices at transit agencies; indeed, most respondents report making changes at their agencies as the proximate result of the training. This was at odds with our exploration of knowledge of procurement topics, as most respondents gave inaccurate answers on multiple-choice "knowledge questions". This may have been due to question structure or, more likely, the nature of online surveys. Suitable training on the procurement of information technology was also a main concern. The lack of training in this area is indicative of the broader challenge facing public transit agencies in how to incorporate new forms of technology into their existing practices and bureaucratic structures. Copyright © 2016 Elsevier Ltd. All rights reserved.
Rebello, Candida J; Nikonova, Elena V; Zhou, Sharon; Aronne, Louis J; Fujioka, Ken; Garvey, W Timothy; Smith, Steven R; Coulter, Ann A; Greenway, Frank L
2018-02-01
This study evaluated the effect of lorcaserin 10 mg twice daily (LOR BID), or with phentermine 15 mg once daily (LOR BID + PHEN QD) and 15 mg twice daily (LOR BID + PHEN BID), in conjunction with energy restriction on food cravings. Two hundred and thirty-five patients without diabetes but with obesity or overweight and ≥ 1 comorbidity received LOR BID, LOR BID + PHEN QD, or LOR BID + PHEN BID for 12 weeks in a randomized double-blind study. The Food Craving Inventory (FCI) and the Control of Eating Questionnaire (COEQ) were administered over 12 weeks. The FCI total score and the subscale scores reduced from baseline in all groups. The least squares means (95% confidence intervals) for the total scores were -0.65 (-0.75 to -0.55), -0.75 (-0.84 to -0.65), and -0.84 (-0.95 to -0.74) in the LOR BID, LOR BID + PHEN QD, and LOR BID + PHEN BID groups, respectively. Cravings assessed by COEQ reduced from baseline in all groups. In general, the combination treatments were more effective than lorcaserin alone. At week 12, except for fruit juice and dairy products, general and specific cravings reduced in LOR BID + PHEN BID compared with LOR BID (P < 0.05). Lorcaserin in combination with phentermine improves control of food cravings during short-term energy restriction. © 2018 The Obesity Society.
76 FR 35461 - Notice of Single Family Loan Sales (SFLS 2011-2)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
... the toll-free Federal Relay Service at 1-800-877-8339. SUPPLEMENTARY INFORMATION: HUD announces its... price. HUD will evaluate the bids submitted and determine the successful bid, in terms of the best value... Sales (SFLS 2011-2) AGENCY: Office of the Assistant Secretary for Housing--Federal Housing Commissioner...
NASA Astrophysics Data System (ADS)
Satyaramesh, P. V.
2014-01-01
This paper presents an application of finite n-person non-cooperative game theory for analyzing bidding strategies of generators in a deregulated energy marketplace with Pool Bilateral contracts so as to maximize their net profits. A new methodology to build bidding methodology for generators participating in oligopoly electricity market has been proposed in this paper. It is assumed that each generator bids a supply function. This methodology finds out the coefficients in the supply function of generators in order to maximize benefits in an environment of competing rival bidders. A natural choice for developing strategies is Nash Equilibrium (NE) model incorporating mixed strategies, for solving the bidding problem of electrical market. Associated optimal profits are evaluated for a combination of set of pure strategies of bidding of generators, and payoff matrix has been constructed. The optimal payoff is calculated by using NE. An attempt has also been made to minimize the gap between the optimal payoff and the payoff obtained by a possible mixed strategies combination. The algorithm is coded in MATLAB. A numerical example is used to illustrate the essential features of the approach and the results are proved to be the optimal values.
Kent, Jeffery D; Holt, Robert J; Jung, Donald; Tidmarsh, George F; Grahn, Amy Y; Ball, Julie; Peura, David A
2014-01-01
Famotidine given at a dose of 80 mg/day is effective in preventing NSAID-induced gastropathy. The aim of this proof of concept study was to compare twice a day (BID) vs 3-times a day (TID) administration of this total dose of famotidine on intragastric pH in healthy volunteers. Two analyses were undertaken: (1) a 13 subject controlled cross-over 24-h intragastric pH evaluation of the BID and TID administration of 80 mg/day of famotidine, as well as measures for drug accumulation over 5 days (EudraCT, number 2006-002930-39); and (2) a pharmacokinetic (PK)/pharmacodynamic (PD) model which predicted steady-state famotidine plasma concentrations and pH of the two regimens. For the cross-over study, gastric pH was above 3.5 for a mean of 20 min longer for TID dosing compared to BID dosing on Day 1. On Day 5, the mean time above this threshold was higher with the BID regimen by ∼25 min. For pH 4, subjects' gastric pH was above this pH value for a mean of 25 min longer for TID dosing compared to BID dosing on Day 1. For Day 5, the pH was above 4 for ∼45 min longer with the TID regimen as compared with the BID regimen. The mean 24-h gastric pH values when taken in the upright position trended higher for the TID dosing period compared to the BID regimen on Day 1. The steady-state simulation model indicated that, following TID dosing, intragastric pH will be above 3 for 24 h vs 16 h for the BID regimen. There was no evidence for plasma accumulation of famotidine with TID dosing as compared to BID dosing from either analysis. The data indicate that overall more time is spent above the acidic threshold pH values when 80 mg/day of famotidine is administered TID vs BID. Key limitations included small study size with a short duration and lack of a baseline examination, but was compensated for by the cross-over and PK/PD modeling design. Although most of the comparisons in this proof of concept study were not statistically significant these results have important implications for future research on gastric acid lowering agents used for the prevention of NSAID-induced gastropathy.
Further studies on lead compounds containing the opioid pharmacophore Dmt-Tic.
Balboni, Gianfranco; Fiorini, Stella; Baldisserotto, Anna; Trapella, Claudio; Sasaki, Yusuke; Ambo, Akihiro; Marczak, Ewa D; Lazarus, Lawrence H; Salvadori, Severo
2008-08-28
Some reference opioids containing the Dmt-Tic pharmacophore, especially the delta agonists H-Dmt-Tic-Gly-NH-Ph (1) and H-Dmt-Tic-NH-(S)CH(CH2-COOH)-Bid (4) (UFP-512) were evaluated for the influence of the substitution of Gly with aspartic acid, its chirality, and the importance of the -NH-Ph and N(1)H-Bid hydrogens in the inductions of delta agonism. The results provide the following conclusions: (i) Asp increases delta selectivity by lowering the mu affinity; (ii) -NH-Ph and N(1)H-Bid nitrogens methylation transforms the delta agonists into delta antagonists; (iii) the substitution of Gly with L-Asp/D-Asp in the delta agonist H-Dmt-Tic-Gly-NH-Ph gave delta antagonists; the same substitution in the delta agonist H-Dmt-Tic-NH-CH2-Bid yielded more selective agonists, H-Dmt-Tic-NH-(S)CH(CH2-COOH)-Bid and H-Dmt-Tic-NH-(R)CH(CH2-COOH)-Bid; (iv) L-Asp seems important only in functional bioactivity, not in receptor affinity; (v) H-Dmt-Tic-NH-(S)CH(CH2-COOH)-Bid(N(1)-Me) (10) evidenced analgesia similar to 4, which was reversed by naltrindole only in the tail flick. 4 and 10 had opposite behaviours in mice; 4 caused agitation, 10 gave sedation and convulsions.
Carroll, Thomas L; Werner, Astrid; Nahikian, Kael; Dezube, Aaron; Roth, Douglas F
2017-10-01
Empiric proton pump inhibitor (PPI) trials for laryngopharyngeal reflux (LPR) are common. A majority of the patients respond to acid suppression. This work intends to evaluate once-daily, 40 mg omeprazole and once-nightly, 300 mg ranitidine (QD/QHS) dosing as an alternative regimen, and use this study's cohort to evaluate empiric regimens prescribed for LPR as compared to up-front testing with pH impedance multichannel intraluminal impedance (MII) with dual pH probes and high-resolution manometry (HRM) for potential cost minimization. Retrospective cohort review and cost minimization study. A chart review identified patients diagnosed with LPR. All subjects were treated sequentially and outcomes recorded. Initial QD/QHS dosing increased after 3 months to BID if no improvement and ultimately prescribed MII and HRM if they failed BID dosing. Decision tree diagrams were constructed to determine costs of two empiric regimens and up-front MII and HRM. Ninety-seven subjects met the criteria. Responders and nonresponders to empiric therapy were identified. Seventy-two subjects (74%) responded. Forty-eight (67% of responders and 49% of all) improved with QD/QHS dosing. Forty-nine (51%) subjects escalated to BID dosing. Twenty-four subjects (33% of responders and 25% of all) improved on BID therapy. Twenty-five subjects (26%) did not respond to acid suppression. Average weighted cost was $1,897.00 per patient for up-front testing, $3,033.00 for initial BID, and $3,366.00 for initial QD/QHS. An alternate QD/QHS regimen improved the majority who presented with presumed LPR. Cost estimates demonstrate that the QD/QHS regimen was more expensive than the initial BID high-dose PPI for 6 months. Overall per-patient cost appears less with up-front MII and HRM. 4. Laryngoscope, 127:S1-S13, 2017. © 2017 The American Laryngological, Rhinological and Otological Society, Inc.
Sherman, Kerry A; Przezdziecki, Astrid; Alcorso, Jessica; Kilby, Christopher Jon; Elder, Elisabeth; Boyages, John; Koelmeyer, Louise; Mackie, Helen
2018-07-01
Purpose Breast cancer treatment adverse effects result in one in three survivors experiencing body image-related distress (BID) that negatively impacts on a woman's ability to recover after cancer and into survivorship. My Changed Body (MyCB) is a Web-based psychological intervention to alleviate BID and improve body appreciation in survivors of breast cancer (BCSs) through a single-session, self-compassion focused writing activity. This randomized controlled trial evaluated the impact of MyCB on BID and body appreciation in BCSs. The moderating effect of lymphedema status (affected or unaffected) and appearance investment (self-importance placed on personal appearance) and the mediating effect of self-compassion were evaluated. Patients and Methods Women (disease-free stage I to III BCSs who had experienced at least one negative event related to bodily changes after breast cancer) were randomly assigned to MyCB (n = 149) or an expressive writing control arm (n = 155). Primary outcomes were reduction in BID and improvement in body appreciation 1 week after intervention. Secondary outcomes included psychological distress (depression and anxiety) and self-compassion. Follow-up assessments occurred 1 week, 1 month, and 3 months after writing. Results Compliance with the MyCB intervention was 88%, and attrition was 9.2%. Intent-to-treat linear mixed models indicated that participants who received MyCB reported significantly less BID ( P = .035) and greater body appreciation ( P = .004) and self-compassion ( P < .001) than expressive writing participants. Intervention effects on BID were moderated by lymphedema status ( P = .007) and appearance investment ( P = .042). Self-compassion mediated effects on both primary outcomes. Therapeutic effects were maintained at 1 month (BID and body appreciation) and 3 months (body appreciation) after intervention. Significant reductions in psychological distress (1-month depression, P = .001; 1-week and 1-month anxiety, P = .007) were evident for MyCB participants with lymphedema. Conclusion This study supports the efficacy of MyCB for reducing BID and enhancing body appreciation among BCSs.
Teng, Renli; Maya, Juan; Butler, Kathleen
2013-01-01
The results of two independent, randomized, two-period crossover, single-center studies, conducted to assess the pharmacokinetics of ticagrelor ± aspirin, inhibition of platelet aggregation (IPA) with ticagrelor/aspirin vs. clopidogrel/aspirin, and safety, tolerability, and bleeding times are reported here. In Study A (open-label), 16 volunteers received ticagrelor (50 mg bid Days 1–5; 200 mg bid Days 6–9; one 200 mg dose on Day 10) ± 300 mg qd aspirin (Days 1–10). In Study B (double-blind, double-dummy), 16 volunteers received aspirin (300 mg loading dose/75 mg qd Days 2–9) with either ticagrelor (200 mg bid Days 4–8, one 200 mg dose on Day 9) or clopidogrel (300 mg loading dose Day 4, 75 mg qd Days 5–9). At steady-state ticagrelor (50 mg bid, or 200 mg bid), concomitant aspirin (300 mg qd) had no effect on mean maximum plasma concentration (C max), median time to C max (t max), or mean area under the plasma concentration-time curve for the dosing interval (AUC0– τ) for ticagrelor and its primary metabolite, AR-C124910XX. Following 200 mg bid ticagrelor, mean C max and AUC0– τ for both parent and metabolite were comparable with co-administration of aspirin at 75 mg and 300 mg qd. Aspirin (300 mg qd) had no effect on IPA (ADP-induced) by ticagrelor. However, aspirin and ticagrelor had an additive effect on IPA (collagen-induced). Ticagrelor/aspirin increased bleeding times vs. baseline. Ticagrelor/aspirin co-administration was well tolerated at all dose combinations evaluated. In summary, the findings of this study demonstrate that co-administration of aspirin (300 mg qd) with ticagrelor (50 mg bid, or 200 mg bid) had no effect on ticagrelor pharmacokinetics or IPA (ADP-induced) by ticagrelor. PMID:23249161
Greening Operations Management: An Online Sustainable Procurement Course for Practitioners
ERIC Educational Resources Information Center
Walker, Helen L.; Gough, Stephen; Bakker, Elmer F.; Knight, Louise A.; McBain, Darian
2009-01-01
In the Operations Management field, sustainable procurement has emerged as a way to green the purchasing and supply process. This paper explores issues in sustainable procurement training. The authors formed an interdisciplinary team to design, deliver and evaluate a training programme to promote and develop sustainable procurement in the United…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, Carl J.
2004-07-13
BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-15
... investigating and evaluating all technical and marketplace factors that may have a bearing on the value of the... cooperate, collaborate, or communicate, including discussing bids, bidding strategies, or post-auction... schedule in order to foster an auction pace that reasonably balances speed with the bidders' need to study...
Incardona, Sandra; Serra-Casas, Elisa; Champouillon, Nora; Nsanzabana, Christian; Cunningham, Jane; González, Iveth J
2017-05-15
Malaria rapid diagnostic tests (RDTs) play a critical role in malaria case management, and assurance of quality is a key factor to promote good adherence to test results. Since 2007, the World Health Organization (WHO) and the Foundation for Innovative New Diagnostics (FIND) have coordinated a Malaria RDT Evaluation Programme, comprising a pre-purchase performance evaluation (product testing, PT) and a pre-distribution quality control of lots (lot testing, LT), the former being the basis of WHO recommendations for RDT procurement. Comprehensive information on malaria RDTs sold worldwide based on manufacturers' data and linked to independent performance data is currently not available, and detailed knowledge of procurement practices remains limited. The use of the PT/LT Programme results as well as procurement and lot verification practices were assessed through a large-scale survey, gathering product-specific RDT sales and procurement data (2011-14 period) from a total of 32 manufacturers, 12 procurers and 68 National Malaria Control Programmes (NMCPs). Manufacturers' reports showed that RDT sales had more than doubled over the four years, and confirmed a trend towards increased compliance with the WHO procurement criteria (from 83% in 2011 to 93% in 2014). Country-level reports indicated that 74% of NMCPs procured only 'WHO-compliant' RDT products, although procurers' transactions datasets revealed a surprisingly frequent overlap of different products and even product types (e.g., Plasmodium falciparum-only and Plasmodium-pan) in the same year and country (60 and 46% of countries, respectively). Importantly, the proportion of 'non-complying' (i.e., PT low scored or not evaluated) products was found to be higher in the private health care sector than in the public sector (32% vs 5%), and increasing over time (from 22% of private sector sales in 2011 to 39% in 2014). An estimated 70% of the RDT market was covered by the LT programme. The opinion about the PT/LT Programmes was positive overall, and quality of RDTs as per the PT Programme was rated as the number one procurement criteria. This survey provided in-depth information on RDT sales and procurement dynamics, including the largely unstudied private sector, and demonstrated how the WHO-FIND Programme has positively influenced procurement practices in the public sector.
Cutolo, Maurizio; Myerson, Gary E; Fleischmann, Roy M; Lioté, Frédéric; Díaz-González, Federico; Van den Bosch, Filip; Marzo-Ortega, Helena; Feist, Eugen; Shah, Kamal; Hu, ChiaChi; Stevens, Randall M; Poder, Airi
2016-09-01
Apremilast, an oral phosphodiesterase 4 inhibitor, downregulates intracellular inflammatory mediator synthesis by elevating cyclic adenosine monophosphate levels. The PALACE 2 trial evaluated apremilast efficacy and safety in patients with active psoriatic arthritis (PsA) despite prior conventional disease-modifying antirheumatic drugs and/or biologic therapy. Eligible patients were randomized (1:1:1) to placebo, apremilast 20 mg BID, or apremilast 30 mg BID. At Week 16, patients with swollen and tender joint count improvement < 20% entered early escape, with placebo patients rerandomized (1:1) to apremilast 20 mg BID or 30 mg BID while apremilast patients continued on their initial apremilast dose. At Week 24, patients remaining on placebo were rerandomized to apremilast 20 mg BID or 30 mg BID. The primary endpoint was the proportion of patients achieving > 20% improvement in American College of Rheumatology response criteria (ACR20) at Week 16. In the intent-to-treat population (N = 484), ACR20 at Week 16 was achieved by more patients receiving apremilast 20 mg BID [37.4% (p = 0.0002)] and 30 mg BID [32.1% (p = 0.0060)] versus placebo (18.9%). Clinically meaningful improvements in signs and symptoms of PsA, physical function, and psoriasis were observed with apremilast through Week 52. The most common adverse events were diarrhea, nausea, headache, and upper respiratory tract infection. Diarrhea and nausea generally occurred early and usually resolved spontaneously with continued treatment. Laboratory abnormalities were infrequent and transient. Apremilast demonstrated clinical improvements in PsA for up to 52 weeks, including signs and symptoms, physical function, and psoriasis. No new safety signals were observed. ClinicalTrials.gov identifier: NCT01212757.
Neßler, Jasmin; Rundfeldt, Chris; Löscher, Wolfgang; Kostic, Draginja; Keefe, Thomas; Tipold, Andrea
2017-01-25
Imepitoin was tested as a combination treatment with phenobarbital in an open-label mono-centre cohort study in dogs with drug-resistant epilepsy. Diagnosis of idiopathic epilepsy was based on clinical findings, magnetic resonance imaging and cerebrospinal fluid analysis. Three cohorts were treated. In cohort A, dogs not responding to phenobarbital with or without established add-on treatment of potassium bromide or levetiracetam were treated add-on with imepitoin, starting at 10 mg/kg BID, with titration allowed to 30 mg/kg BID. In cohort B, the only difference to cohort A was that the starting dose of imepitoin was reduced to 5 mg/kg BID. In cohort C, animals not responding to imepitoin at >20 mg/kg BID were treated with phenobarbital add-on starting at 0.5 mg/kg BID. The add-on treatment resulted in a reduction in monthly seizure frequency (MSF) in all three cohorts. A reduction of ≥50% was obtained in 36-42% of all animals, without significant difference between cohorts. The lower starting dose of 5 mg/kg BID imepitoin was better tolerated, and an up-titration to on average of 15 mg/kg BID was sufficient in cohort A and B. In cohort C, a mean add-on dose of 1.5 mg/kg BID phenobarbital was sufficient to achieve a clinically meaningful effect. Six dogs developed a clinically meaningful increase in MSF of ≥ 50%, mostly in cohort A. Neither imepitoin nor phenobarbital add-on treatment was capable of suppressing cluster seizure activity, making cluster seizure activity an important predictor for drug-resistance. A combination treatment of imepitoin and phenobarbital is a useful treatment option for a subpopulation of dogs with drug-resistant epilepsy, a low starting dose with 5 mg/kg BID is recommended.
2016-01-01
evaluation method that identifies the root causes of an undesired outcome and the Summary xix Root Cause of the JPALS Nunn-McCurdy Breach Under current... evaluation (RDT&E) unit (from 12 to 11) and an increase of one procurement unit for a new total of 27 procurement units. The revised procurement quantity...from the status of the overall portfolio of MDAPs and the status of other subportfolios. In assessing a portfolio, analysts may need to evaluate the
Welfare Impact of Virtual Trading on Wholesale Electricity Markets
NASA Astrophysics Data System (ADS)
Giraldo, Juan S.
Virtual bidding has become a standard feature of multi-settlement wholesale electricity markets in the United States. Virtual bids are financial instruments that allow market participants to take financial positions in the Day-Ahead (DA) market that are automatically reversed/closed in the Real-Time (RT) market. Most U.S. wholesale electricity markets only have two types of virtual bids: a decrement bid (DEC), which is virtual load, and an increment offer (INC), which is virtual generation. In theory, financial participants create benefits by seeking out profitable bidding opportunities through arbitrage or speculation. Benefits have been argued to take the form of increased competition, price convergence, increased market liquidity, and a more efficient dispatch of generation resources. Studies have found that price convergence between the DA and RT markets improved following the introduction of virtual bidding into wholesale electricity markets. The improvement in price convergence was taken as evidence that market efficiency had increased and many of the theoretical benefits realized. Persistent price differences between the DA and RT markets have led to calls to further expand virtual bidding as a means to address remaining market inefficiencies. However, the argument that price convergence is beneficial is extrapolated from the study of commodity and financial markets and the role of futures for increasing market efficiency in that context. This viewpoint largely ignores details that differentiate wholesale electricity markets from other commodity markets. This dissertation advances the understanding of virtual bidding by evaluating the impact of virtual bidding based on the standard definition of economic efficiency which is social welfare. In addition, an examination of the impacts of another type of virtual bid, up-to-congestion (UTC) transactions is presented. This virtual product significantly increased virtual bidding activity in the PJM interconnection market since it became available to be used by financial traders in September 2010. Stylized models are used to determine the optimal bidding strategy for the different virtual bids under different scenarios. The welfare analysis shows that the main impact of virtual bidding is surplus reallocation and that the impact on market efficiency is small by comparison. The market structure is such that it is more likely to see surplus transfers from consumers to producers. The results also show that outcomes with greater price convergence as a result of virtual bidding activity were not necessarily more efficient, nor do they always correct surplus distribution distortions that result from bias in the DA expectation of RT load. Compared to INCs and DECs, the UTC analysis showed that UTCs do not have the same self-corrective incentives towards price convergence and are less likely to lead to nodal price convergence or correct for surplus distribution distortions caused by uncertainty and bias in the DA expectation of RT load. Additionally, the analysis showed that UTCs allow financial traders to engage in low risk high volume trading strategies that, while profitable, may have little to no impact on price convergence or market efficiency.
DeRoeck, Denise; Bawazir, Saleh A; Carrasco, Peter; Kaddar, Miloud; Brooks, Alan; Fitzsimmons, John; Andrus, Jon
2006-01-01
This paper reviews the key design features, accomplishments of and lessons learned from two regional group procurement mechanisms dealing with vaccines that have been in operation for more than 25 years. The Pan American Health Organization (PAHO) EPI Revolving Fund purchases vaccines and immunization supplies on behalf of more than 35 countries in the Latin American and Caribbean region. Based on a 'central contracting' model, the program handles most aspects of procurement-from tendering to contracting with and paying producers--using a common fund to pay producers before being reimbursed by countries once goods are received in-country. The Gulf Cooperation Council (GCC) Group Purchasing Program among seven Persian Gulf States issues joint tenders for vaccines, as well as drugs and other medical goods. Through this 'group contracting' program, countries are responsible for contracting with and paying producers on their own, once the group has selected winning bids. Both programs have experienced substantial growth in the past two decades and are considered to have contributed to or accelerated achievements of immunization programs in both regions, including the introduction of new vaccines. The paper identifies several features of both programs--both those designed to attract country participation and those designed to ensure the programs' financial viability--which help explain their success and longevity.
13 CFR 124.507 - What procedures apply to competitive 8(a) procurements?
Code of Federal Regulations, 2010 CFR
2010-01-01
... boundaries are eligible to submit offers. (3) Competition for all non-construction requirements. Except for... procedures. Procuring activities will conduct competitions among and evaluate offers received from... the Participant submitted its initial offer which includes price. (5) If the procuring activity...
Procurement engineering - the productivity factor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bargerstock, S.B.
1993-01-01
The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment.more » Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station.« less
Vecchi, Veronica; Hellowell, Mark; Gatti, Stefano
2013-05-01
This paper is concerned with the cost-efficiency of Private Finance Initiatives (PFIs) in the delivery of hospital facilities in the UK. We outline a methodology for identifying the "fair" return on equity, based on the Weighted Average Cost of Capital (WACC) of each investor. We apply this method to assess the expected returns on a sample of 77 contracts signed between 1997 and 2011 by health care provider organisations in the UK. We show that expected returns are in general in excess of the WACC benchmarks. The findings highlight significant problems in current procurement practices and the methodologies by which bids are assessed. To minimise the financial impact of hospital investments on health care systems, a regulatory regime must ensure that expected returns are set at the "fair" rate. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.
Lessons learned from Ontario wind energy disputes
NASA Astrophysics Data System (ADS)
Fast, Stewart; Mabee, Warren; Baxter, Jamie; Christidis, Tanya; Driver, Liz; Hill, Stephen; McMurtry, J. J.; Tomkow, Melody
2016-02-01
Issues concerning the social acceptance of wind energy are major challenges for policy-makers, communities and wind developers. They also impact the legitimacy of societal decisions to pursue wind energy. Here we set out to identify and assess the factors that lead to wind energy disputes in Ontario, Canada, a region of the world that has experienced a rapid increase in the development of wind energy. Based on our expertise as a group comprising social scientists, a community representative and a wind industry advocate engaged in the Ontario wind energy situation, we explore and suggest recommendations based on four key factors: socially mediated health concerns, the distribution of financial benefits, lack of meaningful engagement and failure to treat landscape concerns seriously. Ontario's recent change from a feed-in-tariff-based renewable electricity procurement process to a competitive bid process, albeit with more attention to community engagement, will only partially address these concerns.
Optical fiber sensors: Accelerating applications in Navy ships
NASA Astrophysics Data System (ADS)
Day, G. W.; Lovely, P. S.; Whitesel, H. K.; Hickernell, R. K.
1994-05-01
The Navy needs new sensors for shipboard machinery monitoring and control, condition-based maintenance, and damage assessment. Optical fiber sensors are strongly preferred because of their immunity to electrical disturbances, as well as potential size, weight, and performance advantages. But despite well over a decade of development and promise, relatively few optical fiber sensors available today can meet the Navy's needs with acceptable performance and cost. This report examines the reasons and recommends strategies to help the Navy achieve its goals. Some of the recommendations confirm approaches that the Navy is already implementing. Optical fiber sensors have very valuable potential advantages, but those that the Navy can use may remain too expensive to be deployed if the Navy uses traditional methods of writing specifications and soliciting development and procurement bids. For this reason, the study focuses on cooperation with industry and promoting commercial off-the-shelf and dual-use technology.
Blast-Induced Color Change in Photonic Crystals Corresponds with Brain Pathology
Cullen, D. Kacy; Browne, Kevin D.; Xu, Yongan; Adeeb, Saleena; Wolf, John A.; McCarron, Richard M.; Yang, Shu; Chavko, Mikulas
2011-01-01
Abstract A high incidence of blast exposure is a 21st century reality in counter-insurgency warfare. However, thresholds for closed-head blast-induced traumatic brain injury (bTBI) remain unknown. Moreover, without objective information about relative blast exposure, warfighters with bTBI may not receive appropriate medical care and may remain in harm's way. Accordingly, we have engineered a blast injury dosimeter (BID) using a photonic crystalline material that changes color following blast exposure. The photonic crystals are fabricated using SU-8 via multi-beam interference laser lithography. The final BID is similar in appearance to an array of small colored stickers that may be affixed to uniforms or helmets in multiple locations. Although durable under normal conditions, the photonic crystalline micro- and nano-structure are precisely altered by blast to create a color change. These BIDs were evaluated using a rat model of bTBI, for which blast shockwave exposure was generated via a compressed air-driven shock tube. With prototype BID arrays affixed to the animals, we found that BID color changes corresponded with subtle brain pathologies, including neuronal degeneration and reactive astrocytosis. These subtle changes were most notable in the dentate gyrus of the hippocampus, cerebral cortex, and cerebellum. These data demonstrate the feasibility of using a materials-based, power-free colorimetric BID as the first self-contained blast sensor calibrated to correspond with brain pathology. PMID:22082449
Choi, Hyo Sun; Park, Dong Il; Hwang, Sang Jun; Park, Jung Sik; Kim, Hong Joo; Cho, Yong Kyun; Sohn, Chong Il; Jeon, Woo Kyu; Kim, Byung Ik
2007-12-01
Up to present, omeprazole plus two antibiotics are used for Helicobacter pylori eradication therapy . Few studies have compared double-dose new-generation, proton pump inhibitors (PPI) with omeprazole. Therefore, we conducted a randomized, prospective study to evaluate differences in H. pylori eradication rates by PPI type. Between January 2006 and December 2006, 576 consecutive patients with proven H. pylori infection were enrolled prospectively. Four different PPIs [omeprazole 20 mg b.i.d. (old generation), or pantoprazole 40 mg b.i.d., rabeprazole 20 mg b.i.d., or esomeprazole 40 mg b.i.d. (new generation)] were added to clarithromycin (500 mg b.i.d.) and amoxicillin (1 g b.i.d.) for 1 week. By intention-to-treat analysis, no difference was found between the eradication rates of these four PPIs: 64.9% (omeprazole, n = 148), 69.3% (pantoprazole, n = 140), 69.3% (rabeprazole, n = 140), and 72.9% (esomoprazole, n = 148). When eradication rates were analyzed according to whether patients had an ulcer or not on a per-protocol basis, no difference was found between the eradication rates of the four PPIs. However, side-effects were more common in the esomeprazole-based triple therapy group than in the other groups (p < .05). No convincing evidence was obtained that double-dose new-generation PPIs have better H. pylori eradication rates and tolerability than omeprazole.
48 CFR 19.201 - General policy.
Code of Federal Regulations, 2013 CFR
2013-10-01
... authorized small disadvantaged business (SDB) procurement mechanisms and applicable factors (percentages... shall not affect ongoing acquisitions. The SDB procurement mechanisms are a price evaluation adjustment for SDB concerns (see Subpart 19.11), an evaluation factor or subfactor for participation of SDB...
48 CFR 19.201 - General policy.
Code of Federal Regulations, 2011 CFR
2011-10-01
... authorized small disadvantaged business (SDB) procurement mechanisms and applicable factors (percentages... shall not affect ongoing acquisitions. The SDB procurement mechanisms are a price evaluation adjustment for SDB concerns (see Subpart 19.11), an evaluation factor or subfactor for participation of SDB...
48 CFR 19.201 - General policy.
Code of Federal Regulations, 2012 CFR
2012-10-01
... authorized small disadvantaged business (SDB) procurement mechanisms and applicable factors (percentages... shall not affect ongoing acquisitions. The SDB procurement mechanisms are a price evaluation adjustment for SDB concerns (see Subpart 19.11), an evaluation factor or subfactor for participation of SDB...
A new quantum sealed-bid auction protocol with secret order in post-confirmation
NASA Astrophysics Data System (ADS)
Wang, Jing-Tao; Chen, Xiu-Bo; Xu, Gang; Meng, Xiang-Hua; Yang, Yi-Xian
2015-10-01
A new security protocol for quantum sealed-bid auction is proposed to resist the collusion attack from some malicious bidders. The most significant feature of this protocol is that bidders prepare their particles with secret order in post-confirmation for encoding bids. In addition, a new theorem and its proof are given based on the theory of combinatorial mathematics, which can be used as evaluation criteria for the collusion attack. It is shown that the new protocol is immune to the collusion attack and meets the demand for a secure auction. Compared with those previous protocols, the security, efficiency and availability of the proposed protocol are largely improved.
Garvey, W. Timothy; Greenway, Frank L.; Zhou, Sharon; Fain, Randi; Pilson, Robert; Fujioka, Ken; Aronne, Louis J.
2017-01-01
Objective To assess the short‐term tolerability of lorcaserin alone or with two dose regimens of phentermine. Methods This was a 12‐week, randomized, double‐blind, pilot safety study of N = 238 nondiabetic patients with obesity or overweight with ≥1 comorbidity randomized to lorcaserin 10 mg twice daily (BID; LOR BID) alone or with phentermine 15 mg once daily (QD; LOR BID+PHEN QD) or 15 mg twice daily (LOR BID+PHEN BID). Patients reporting ≥ 1 of 9 potentially serotonergic adverse events (AEs), mean weight loss (WL), and ≥5% WL are reported. Results N = 238 were randomized, and N = 235 were treated. N = 94 reported potentially serotonergic AEs: 37.2% LOR BID, 42.3% LOR BID+PHEN QD, and 40.5% LOR BID+PHEN BID. AEs leading to discontinuation were reported approximately twice as often in the LOR BID+PHEN BID group versus the LOR BID group. Mean WL was 3.5 kg/3.3%, 7.0 kg/6.7%, and 7.6 kg/7.2% for LOR BID, LOR BID+PHEN QD, and LOR BID+PHEN BID, respectively. At least 5% WL was achieved by 28.2% LOR BID, 59.0% LOR BID+PHEN QD (P = 0.0002 vs. LOR BID), and 70.9% LOR BID+PHEN BID (P < 0.0001 vs. LOR BID) patients. Conclusions Phentermine added to lorcaserin enhanced short‐term weight loss but did not increase incidence of potentially serotonergic AEs; however, phentermine twice daily increased discontinuation compared to both lorcaserin alone and lorcaserin plus phentermine once daily. PMID:28440045
Smith, Steven R; Garvey, W Timothy; Greenway, Frank L; Zhou, Sharon; Fain, Randi; Pilson, Robert; Fujioka, Ken; Aronne, Louis J
2017-05-01
To assess the short-term tolerability of lorcaserin alone or with two dose regimens of phentermine. This was a 12-week, randomized, double-blind, pilot safety study of N = 238 nondiabetic patients with obesity or overweight with ≥1 comorbidity randomized to lorcaserin 10 mg twice daily (BID; LOR BID) alone or with phentermine 15 mg once daily (QD; LOR BID+PHEN QD) or 15 mg twice daily (LOR BID+PHEN BID). Patients reporting ≥ 1 of 9 potentially serotonergic adverse events (AEs), mean weight loss (WL), and ≥5% WL are reported. N = 238 were randomized, and N = 235 were treated. N = 94 reported potentially serotonergic AEs: 37.2% LOR BID, 42.3% LOR BID+PHEN QD, and 40.5% LOR BID+PHEN BID. AEs leading to discontinuation were reported approximately twice as often in the LOR BID+PHEN BID group versus the LOR BID group. Mean WL was 3.5 kg/3.3%, 7.0 kg/6.7%, and 7.6 kg/7.2% for LOR BID, LOR BID+PHEN QD, and LOR BID+PHEN BID, respectively. At least 5% WL was achieved by 28.2% LOR BID, 59.0% LOR BID+PHEN QD (P = 0.0002 vs. LOR BID), and 70.9% LOR BID+PHEN BID (P < 0.0001 vs. LOR BID) patients. Phentermine added to lorcaserin enhanced short-term weight loss but did not increase incidence of potentially serotonergic AEs; however, phentermine twice daily increased discontinuation compared to both lorcaserin alone and lorcaserin plus phentermine once daily. © 2017 The Authors. Obesity published by Wiley Periodicals, Inc. on behalf of The Obesity Society (TOS).
Bidding cost evaluation with fuzzy methods on building project in Jakarta
NASA Astrophysics Data System (ADS)
Susetyo, Budi; Utami, Tin Budi
2017-11-01
National construction companies today demanded to become more competitive to face increasingly competition. Every construction company especially the contractor must work better than ever. Ability to prepare cost of the work that represents the efficiency and effectiveness of the implementation of the work necessary to produce cost - competitive. The project is considered successful if the target meets the quality, cost and time. From the aspect of cost, the project has been designed in accordance with certain technical criteria to be taken into account based on standard costs. To ensure the cost efficiency of the bidding process carried out meet the rules of a fairly and competitive. The research objective is to formulate the proper way to compare several deals with the standard cost of the work. The fuzzy technique is used as a evaluation methods to decision making. The evaluation not merely based on the lowest prices. The methods is looking for the most valuable and reasonable prices. The comparison is conducted to determine the most cost-competitive and reasonable as the winner of the bidding.
Huang, Kai; Zhang, Jingjing; O'Neill, Katelyn L.; Gurumurthy, Channabasavaiah B.; Quadros, Rolen M.; Tu, Yaping; Luo, Xu
2016-01-01
The BH3-only protein Bid is known as a critical mediator of the mitochondrial pathway of apoptosis following death receptor activation. However, since full-length Bid possesses potent apoptotic activity, the role of a caspase-mediated Bid cleavage is not established in vivo. In addition, due to the fact that multiple caspases cleave Bid at the same site in vitro, the identity of the Bid-cleaving caspase during death receptor signaling remains uncertain. Moreover, as Bid maintains its overall structure following its cleavage by caspase 8, it remains unclear how Bid is activated upon cleavage. Here, Bid-deficient (Bid KO) colon cancer cells were generated by gene editing, and were reconstituted with wild-type or mutants of Bid. While the loss of Bid blocked apoptosis following treatment by TNF-related apoptosis inducing ligand (TRAIL), this blockade was relieved by re-introduction of the wild-type Bid. In contrast, the caspase-resistant mutant BidD60E and a BH3 defective mutant BidG94E failed to restore TRAIL-induced apoptosis. By generating Bid/Bax/Bak-deficient (TKO) cells, we demonstrated that Bid is primarily cleaved by caspase 8, not by effector caspases, to give rise to truncated Bid (tBid) upon TRAIL treatment. Importantly, despite the presence of an intact BH3 domain, a tBid mutant lacking the mitochondrial targeting helices (α6 and α7) showed diminished apoptotic activity. Together, these results for the first time establish that cleavage by caspase 8 and the subsequent association with the outer mitochondrial membrane are two critical events that activate Bid during death receptor-mediated apoptosis. PMID:27053107
Huang, Kai; Zhang, Jingjing; O'Neill, Katelyn L; Gurumurthy, Channabasavaiah B; Quadros, Rolen M; Tu, Yaping; Luo, Xu
2016-05-27
The BH3-only protein Bid is known as a critical mediator of the mitochondrial pathway of apoptosis following death receptor activation. However, since full-length Bid possesses potent apoptotic activity, the role of a caspase-mediated Bid cleavage is not established in vivo In addition, due to the fact that multiple caspases cleave Bid at the same site in vitro, the identity of the Bid-cleaving caspase during death receptor signaling remains uncertain. Moreover, as Bid maintains its overall structure following its cleavage by caspase 8, it remains unclear how Bid is activated upon cleavage. Here, Bid-deficient (Bid KO) colon cancer cells were generated by gene editing, and were reconstituted with wild-type or mutants of Bid. While the loss of Bid blocked apoptosis following treatment by TNF-related apoptosis inducing ligand (TRAIL), this blockade was relieved by re-introduction of the wild-type Bid. In contrast, the caspase-resistant mutant Bid(D60E) and a BH3 defective mutant Bid(G94E) failed to restore TRAIL-induced apoptosis. By generating Bid/Bax/Bak-deficient (TKO) cells, we demonstrated that Bid is primarily cleaved by caspase 8, not by effector caspases, to give rise to truncated Bid (tBid) upon TRAIL treatment. Importantly, despite the presence of an intact BH3 domain, a tBid mutant lacking the mitochondrial targeting helices (α6 and α7) showed diminished apoptotic activity. Together, these results for the first time establish that cleavage by caspase 8 and the subsequent association with the outer mitochondrial membrane are two critical events that activate Bid during death receptor-mediated apoptosis. © 2016 by The American Society for Biochemistry and Molecular Biology, Inc.
NRC assessment of improvements in licensee procurement and dedication programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grimes, B.K.; Potapovs, U.; Campbell, L.L.
1991-01-01
The US Nuclear Regulatory Commission (NRC) recently conducted a series of on-site assessments at selected nuclear plants to review improvements that the licenses had made to their procurement and dedication activities. The assessments included an evaluation of the progress made by licensees to strengthen their commercial-grade dedication programs to comply with 10CRF50, Appendix B, and to implement the comprehensive procurement improvements suggested in Nuclear Management and Resource Council (NUMARC) publication 901-3. This paper discusses the overall purpose of the assessments, procurement areas assessed, major strengths and weaknesses identified in licensee procurement programs, and the NRC's perspective of the industry's responsemore » to NUMARC procurement initiatives.« less
Fuller, Jason C.; Chassin, David P.; Pratt, Robert G.; Hauer, Matthew; Tuffner, Francis K.
2017-03-07
Disclosed herein are representative embodiments of methods, apparatus, and systems for distributing a resource (such as electricity) using a resource allocation system. One of the disclosed embodiments is a method for operating a transactive thermostatic controller configured to submit bids to a market-based resource allocation system. According to the exemplary method, a first bid curve is determined, the first bid curve indicating a first set of bid prices for corresponding temperatures and being associated with a cooling mode of operation for a heating and cooling system. A second bid curve is also determined, the second bid curve indicating a second set of bid prices for corresponding temperatures and being associated with a heating mode of operation for a heating and cooling system. In this embodiment, the first bid curve, the second bid curve, or both the first bid curve and the second bid curve are modified to prevent overlap of any portion of the first bid curve and the second bid curve.
The transformation of the tender evaluation process in public procurement in Poland
NASA Astrophysics Data System (ADS)
Plebankiewicz, E.; Kozik, R.
2017-10-01
Procedures regarding the evaluation of tenders have been changed since the public procurement law was enacted (it came into force in January 1, 1995). The contracting authority could apply both the criteria related to the qualities of the contractor and those related to the to the subject - matter of public contract. Two extensive amendments in 2001 and a government project introduced vital regulations and excluded the possibility of applying criteria related to the qualities of the contractor. Act of 29 January 2004 Public Procurement Law allowed to use price as the sole contract award criterion. The changes in the Law in 2014 restricted that possibility to the situation in which the subject matter of a contract is commonly available and has established quality standards. The Act of 22 June 2016 amending the Public Procurement Law Act and some other laws introduced the new criteria list and limited the importance of the price criterion in the certain situations. Instead of price, the cost can also be a criterion for tender evaluation. The cost criterion can be determined using life cycle costing. In the paper, based on contract notices of open tendering published in the Public Procurement Bulletin, the criteria of construction contract selection will be analysed. In particular the effectiveness of changes in the Procurement Law will be researched.
DOT National Transportation Integrated Search
2009-04-01
This project evaluates the process that was followed by MDOT and other stakeholders for the acquisition : of new Advanced Traffic Management System (ATMS) software aiming to integrate and facilitate the : management of various Intelligent Transportat...
Sheu, Wayne H-H; Brunell, Steven C; Blase, Erich
2016-04-01
The efficacy and safety of exenatide twice daily (BID) and once weekly (QW) were assessed in Asian versus White patients with type 2 diabetes mellitus (T2DM). This post-hoc pooled analysis evaluated patients receiving 10μg exenatide BID for 12-30 weeks or 2mg exenatide QW for 24-30 weeks in exenatide clinical development program trials. Race was self-identified. A total of 4625 patients were included (exenatide BID: Asian, n=787; White, n=2223; exenatide QW: Asian, n=511; White, n=1104). At study end, glycated hemoglobin (HbA1c), fasting glucose (FG), body weight, post-prandial glucose (PPG), and PPG excursions were significantly reduced (all P<0.0001 vs baseline). For exenatide BID, HbA1c reduction was greater in Asians (P<0.0001 vs Whites), whereas HbA1c reduction did not differ by race for exenatide QW. FG reduction did not differ by race for either exenatide formulation. Weight reduction was significantly greater in Whites (P<0.0001 vs Asians), regardless of exenatide formulation. PPG reduction was greater in Asians (P<0.0001 vs Whites) for exenatide BID but did not differ by race for exenatide QW. For exenatide BID, reductions in PPG excursions for all meals were significantly greater in Asians (P<0.0001 vs Whites), whereas only post-breakfast and post-lunch excursions were significantly greater in Asians for exenatide QW (P=0.0009 and P=0.0189 vs Whites, respectively). Common adverse events included nausea, headache, and diarrhea. Exenatide BID and QW improved glycemic control, including PPG, in Asian and White patients with T2DM. With exenatide BID, Asian patients exhibited significantly greater reductions in HbA1c and PPG than White patients. Both exenatide formulations were well tolerated in both groups. Copyright © 2016 The Authors. Published by Elsevier Ireland Ltd.. All rights reserved.
Panés, Julian; Vermeire, Séverine; Lindsay, James O; Sands, Bruce E; Su, Chinyu; Friedman, Gary; Zhang, Haiying; Yarlas, Aaron; Bayliss, Martha; Maher, Stephen; Cappelleri, Joseph C; Bushmakin, Andrew G; Rubin, David T
2018-01-24
Tofacitinib is an oral, small molecule Janus kinase [JAK] inhibitor that is being investigated for ulcerative colitis [UC]. We evaluated health-related quality of life [HRQoL] in tofacitinib UC Phase 3 studies. Patients ≥ 18 years old in OCTAVE Induction 1 [N = 598] and 2 [N = 541] with moderately to severely active UC were randomised [1:4] to placebo or tofacitinib 10 mg twice daily [BID] for 8 weeks. Subsequently, OCTAVE Sustain re-randomised [1:1:1] clinical responders [N = 593] from induction studies to placebo, tofacitinib 5 mg BID, or 10 mg BID, for 52 weeks. Inflammatory Bowel Disease Questionnaire [IBDQ] and SF-36v2® Health Survey [SF-36v2] assessed HRQoL. In OCTAVE Induction 1 and 2, mean changes from baseline IBDQ were greater with tofacitinib 10 mg BID at Week 8 [28.9 and 31.5] versus placebo [15.4 and 17.2; p < 0.0001]; mean changes from baseline SF-36v2 Physical and Mental Component Summaries [PCS/MCS] were also greater with 10 mg BID [PCS: 6.8 and 6.8; MCS: 6.8 and 7.6] versus placebo [PCS: 2.5 and 4.6; MCS: 3.5 and 4.4; p < 0.01]. In OCTAVE Sustain atWeek 52, changes in IBDQ were maintained with tofacitinib 5 mg [-1.3] and 10 mg BID [0.6], and larger with placebo [-20.2; p < 0.0001]. Changes in SF-36v2 PCS/MCS were also maintained with 5 mg [PCS: 0.0; MCS: -1.0] and 10 mg BID [PCS: 0.3; MCS: 0.1] versus placebo [PCS: -5.2; MCS: -6.7; p < 0.0001] at Week 52 in OCTAVE Sustain. Tofacitinib 10 mg BID induction therapy significantly improved HRQoL versus placebo at Week 8. Improvements were maintained through 52 weeks' maintenance therapy with tofacitinib 5 mg and 10 mg BID. NCT01465763, NCT01458951 and NCT01458574. © European Crohn’s and Colitis Organisation (ECCO) 2017.
Panés, Julian; Vermeire, Séverine; Lindsay, James O; Sands, Bruce E; Su, Chinyu; Friedman, Gary; Zhang, Haiying; Yarlas, Aaron; Bayliss, Martha; Maher, Stephen; Cappelleri, Joseph C; Bushmakin, Andrew G; Rubin, David T
2018-01-01
Abstract Background and Aims Tofacitinib is an oral, small molecule Janus kinase [JAK] inhibitor that is being investigated for ulcerative colitis [UC]. We evaluated health-related quality of life [HRQoL] in tofacitinib UC Phase 3 studies. Methods Patients ≥ 18 years old in OCTAVE Induction 1 [N = 598] and 2 [N = 541] with moderately to severely active UC were randomised [1:4] to placebo or tofacitinib 10 mg twice daily [BID] for 8 weeks. Subsequently, OCTAVE Sustain re-randomised [1:1:1] clinical responders [N = 593] from induction studies to placebo, tofacitinib 5 mg BID, or 10 mg BID, for 52 weeks. Inflammatory Bowel Disease Questionnaire [IBDQ] and SF-36v2® Health Survey [SF-36v2] assessed HRQoL. Results In OCTAVE Induction 1 and 2, mean changes from baseline IBDQ were greater with tofacitinib 10 mg BID at Week 8 [28.9 and 31.5] versus placebo [15.4 and 17.2; p < 0.0001]; mean changes from baseline SF-36v2 Physical and Mental Component Summaries [PCS/MCS] were also greater with 10 mg BID [PCS: 6.8 and 6.8; MCS: 6.8 and 7.6] versus placebo [PCS: 2.5 and 4.6; MCS: 3.5 and 4.4; p < 0.01]. In OCTAVE Sustain atWeek 52, changes in IBDQ were maintained with tofacitinib 5 mg [-1.3] and 10 mg BID [0.6], and larger with placebo [-20.2; p < 0.0001]. Changes in SF-36v2 PCS/MCS were also maintained with 5 mg [PCS: 0.0; MCS: -1.0] and 10 mg BID [PCS: 0.3; MCS: 0.1] versus placebo [PCS: -5.2; MCS: -6.7; p < 0.0001] at Week 52 in OCTAVE Sustain. Conclusions Tofacitinib 10 mg BID induction therapy significantly improved HRQoL versus placebo at Week 8. Improvements were maintained through 52 weeks’ maintenance therapy with tofacitinib 5 mg and 10 mg BID. ClinicalTrials.gov registration numbers NCT01465763, NCT01458951 and NCT01458574 PMID:29028981
Models for electricity market efficiency and bidding strategy analysis
NASA Astrophysics Data System (ADS)
Niu, Hui
This dissertation studies models for the analysis of market efficiency and bidding behaviors of market participants in electricity markets. Simulation models are developed to estimate how transmission and operational constraints affect the competitive benchmark and market prices based on submitted bids. This research contributes to the literature in three aspects. First, transmission and operational constraints, which have been neglected in most empirical literature, are considered in the competitive benchmark estimation model. Second, the effects of operational and transmission constraints on market prices are estimated through two models based on the submitted bids of market participants. Third, these models are applied to analyze the efficiency of the Electric Reliability Council Of Texas (ERCOT) real-time energy market by simulating its operations for the time period from January 2002 to April 2003. The characteristics and available information for the ERCOT market are considered. In electricity markets, electric firms compete through both spot market bidding and bilateral contract trading. A linear asymmetric supply function equilibrium (SFE) model with transmission constraints is proposed in this dissertation to analyze the bidding strategies with forward contracts. The research contributes to the literature in several aspects. First, we combine forward contracts, transmission constraints, and multi-period strategy (an obligation for firms to bid consistently over an extended time horizon such as a day or an hour) into the linear asymmetric supply function equilibrium framework. As an ex-ante model, it can provide qualitative insights into firms' behaviors. Second, the bidding strategies related to Transmission Congestion Rights (TCRs) are discussed by interpreting TCRs as linear combination of forwards. Third, the model is a general one in the sense that there is no limitation on the number of firms and scale of the transmission network, which can have asymmetric linear marginal cost structures. In addition to theoretical analysis, we apply our model to simulate the ERCOT real-time market from January 2002 to April 2003. The effects of forward contracts on the ERCOT market are evaluated through the results. It is shown that the model is able to capture features of bidding behavior in the market.
Daga, Haruko; Takeda, Koji; Okada, Hideaki; Miyazaki, Masaki; Ueda, Shinya; Kaneda, Hiroyasu; Okamoto, Isamu; Yoh, Kiyotaka; Goto, Koichi; Konishi, Koichi; Sarashina, Akiko; Tanaka, Tetsuya; Kaiser, Rolf; Nakagawa, Kazuhiko
2015-12-01
This open-label, phase I, dose-escalation part of a phase I/II study evaluated the safety, pharmacokinetics, and preliminary efficacy of nintedanib, a triple angiokinase inhibitor, combined with pemetrexed in Japanese patients with advanced non-small cell lung cancer (NSCLC) after first-line chemotherapy. A fixed dose of pemetrexed (500 mg/m(2) iv) was administered on Day 1 of each 21-day cycle followed by oral nintedanib twice daily (bid) on days 2-21, starting at 100 mg bid and escalating to 200 mg bid in 50-mg intervals, using a standard 3 + 3 design. After ≥4 cycles of combination therapy, patients could continue nintedanib monotherapy until disease progression or undue adverse events (AEs). Primary endpoints were maximum tolerated dose (MTD), defined as the highest dose at which the incidence of dose-limiting toxicities (DLTs) was <33.3 % during the first treatment course, and AEs (CTCAE v3.0). DLTs were primarily defined as grade ≥3 non-hematologic or grade 4 hematologic AEs. Eighteen patients were included in the analysis. DLTs were experienced by 2/9 patients receiving 200 mg bid, 1/6 receiving 150 mg bid, and 0/3 receiving the lowest dose. The MTD of nintedanib plus pemetrexed was 200 mg bid. The most common drug-related AEs were elevated liver enzymes and gastrointestinal AEs. Two patients achieved partial response, and 10 had stable disease. Nintedanib plus pemetrexed had a manageable safety profile and showed promising signs of efficacy in previously treated Japanese patients with advanced NSCLC. As in Caucasian patients, the MTD of nintedanib was 200 mg bid. Clinical trial information NCT00979576.
Nations, Kari R; Dogterom, Peter; Bursi, Roberta; Schipper, Jacques; Greenwald, Scott; Zraket, David; Gertsik, Lev; Johnstone, Jack; Lee, Allen; Pande, Yogesh; Ruigt, Ge; Ereshefsky, Larry
2012-12-01
Org 26576 acts by modulating ionotropic AMPA-type glutamate receptors to enhance glutamatergic neurotransmission. The aim of this Phase 1b study (N=54) was to explore safety, tolerability, pharmacokinetics, and pharmacodynamics of Org 26576 in depressed patients. Part I (N=24) evaluated the maximum tolerated dose (MTD) and optimal titration schedule in a multiple rising dose paradigm (range 100 mg BID to 600 mg BID); Part II (N=30) utilized a parallel groups design (100 mg BID, 400 mg BID, placebo) to examine all endpoints over a 28-day dosing period. Based on the number of moderate intensity adverse events reported at the 600 mg BID dose level, the MTD established in Part I was 450 mg BID. Symptomatic improvement as measured by the Montgomery-Asberg Depression Rating Scale was numerically greater in the Org 26576 groups than in the placebo group in both study parts. In Part II, the 400 mg BID dose was associated with improvements in executive functioning and speed of processing cognitive tests. Org 26576 was also associated with growth hormone increases and cortisol decreases at the end of treatment but did not influence prolactin or brain-derived neurotrophic factor. The quantitative electroencephalogram index Antidepressant Treatment Response at Week 1 was able to significantly predict symptomatic response at endpoint in the active treatment group, as was early improvement in social acuity. Overall, Org 26576 demonstrated good tolerability and pharmacokinetic properties in depressed patients, and pharmacodynamic endpoints suggested that it may show promise in future well-controlled, adequately powered proof of concept trials.
Feldman, Howard H; Lane, Roger
2007-10-01
To evaluate the efficacy and safety of rapidly titrated rivastigmine administered twice (BID) or three times (TID) daily in patients with mild to moderate Alzheimer's disease (AD). This was a 26 week international, randomised, double blind, placebo controlled study in which 678 patients with probable AD received placebo or rivastigmine 2-12 mg/day BID or TID. Primary outcome measures included the cognitive subscale of the AD Assessment Scale (ADAS-cog) and categorical analysis of the Clinician Interview Based Impression of Change incorporating caregiver information (CIBIC-Plus). Secondary outcomes were the CIBIC-Plus change from baseline, Progressive Deterioration Scale, ADAS-cogA, Mini-Mental State Examination and Global Deterioration Scale. At week 26, mean rivastigmine dose was 9.6 (2.76) mg/day in the TID group and 8.9 (2.93) mg/day in the BID group. Mean ADAS-cog changes from baseline in the TID and BID rivastigmine treated groups were -0.2 (SD 7.3) and 1.2 (SD 7.2) versus 2.8 (SD 7.2) for the placebo group (p<0.05). Differences between rivastigmine TID and placebo on the CIBIC-Plus categorical responder analysis were significant (31% vs 19%; p<0.05, intention to treat). No significant differences were seen between BID and placebo for this outcome measure. Adverse events were predominantly gastrointestinal, occurring mainly during dose titration. Withdrawal because of adverse events accounted for 17% of BID, 11% of TID and 9% of placebo patients. Rivastigmine administered as a BID or TID regimen significantly benefited cognitive, function and global performances in AD patients. The TID regimen showed a tendency for superior tolerability and permitted titration to higher doses, an outcome that is significant as the efficacy of rivastigmine is dose related.
Hsu, Ya-Chi; Jerng, Jih-Shuin; Chang, Ching-Wen; Chen, Li-Chin; Hsieh, Ming-Yuan; Huang, Szu-Fen; Liu, Yueh-Ping; Hung, Kuan-Yu
2014-08-11
The process involved in organ procurement and transplantation is very complex that requires multidisciplinary coordination and teamwork. To prevent error during the processes, teamwork education and training might play an important role. We wished to evaluate the efficacy of implementing a Team Resource Management (TRM) program on patient safety and the behaviors of the team members involving in the process. We implemented a TRM training program for the organ procurement and transplantation team members of the National Taiwan University Hospital (NTUH), a teaching medical center in Taiwan. This 15-month intervention included TRM education and training courses for the healthcare workers, focused group skill training for the procurement and transplantation team members, video demonstration and training, and case reviews with feedbacks. Teamwork culture was evaluated and all procurement and transplantation cases were reviewed to evaluate the application of TRM skills during the actual processes. During the intervention period, a total of 34 staff members participated the program, and 67 cases of transplantations were performed. Teamwork framework concept was the most prominent dimension that showed improvement from the participants for training. The team members showed a variety of teamwork behaviors during the process of procurement and transplantation during the intervention period. Of note, there were two potential donors with a positive HIV result, for which the procurement processed was timely and successfully terminated by the team. None of the recipients was transplanted with an infected organ. No error in communication or patient identification was noted during review of the case records. Implementation of a Team Resource Management program improves the teamwork culture as well as patient safety in organ procurement and transplantation.
2014-01-01
Background The process involved in organ procurement and transplantation is very complex that requires multidisciplinary coordination and teamwork. To prevent error during the processes, teamwork education and training might play an important role. We wished to evaluate the efficacy of implementing a Team Resource Management (TRM) program on patient safety and the behaviors of the team members involving in the process. Methods We implemented a TRM training program for the organ procurement and transplantation team members of the National Taiwan University Hospital (NTUH), a teaching medical center in Taiwan. This 15-month intervention included TRM education and training courses for the healthcare workers, focused group skill training for the procurement and transplantation team members, video demonstration and training, and case reviews with feedbacks. Teamwork culture was evaluated and all procurement and transplantation cases were reviewed to evaluate the application of TRM skills during the actual processes. Results During the intervention period, a total of 34 staff members participated the program, and 67 cases of transplantations were performed. Teamwork framework concept was the most prominent dimension that showed improvement from the participants for training. The team members showed a variety of teamwork behaviors during the process of procurement and transplantation during the intervention period. Of note, there were two potential donors with a positive HIV result, for which the procurement processed was timely and successfully terminated by the team. None of the recipients was transplanted with an infected organ. No error in communication or patient identification was noted during review of the case records. Conclusion Implementation of a Team Resource Management program improves the teamwork culture as well as patient safety in organ procurement and transplantation. PMID:25115403
Remote sensing procurement package: A technical guide for state and local governments
NASA Technical Reports Server (NTRS)
1981-01-01
The guide provides the tools and techniques for procuring remote sensing products and services. It is written for administrators, procurement officials and line agency staff who are directly involved in identifying information needs; defining remote sensing project requirements; soliciting and evaluating contract responses and negotiating, awarding, and administering contracts.
TACtic- A Multi Behavioral Agent for Trading Agent Competition
NASA Astrophysics Data System (ADS)
Khosravi, Hassan; Shiri, Mohammad E.; Khosravi, Hamid; Iranmanesh, Ehsan; Davoodi, Alireza
Software agents are increasingly being used to represent humans in online auctions. Such agents have the advantages of being able to systematically monitor a wide variety of auctions and then make rapid decisions about what bids to place in what auctions. They can do this continuously and repetitively without losing concentration. To provide a means of evaluating and comparing (benchmarking) research methods in this area the trading agent competition (TAC) was established. This paper describes the design, of TACtic. Our agent uses multi behavioral techniques at the heart of its decision making to make bidding decisions in the face of uncertainty, to make predictions about the likely outcomes of auctions, and to alter the agent's bidding strategy in response to the prevailing market conditions.
23 CFR 635.113 - Bid opening and bid tabulations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.113 Bid opening and bid tabulations. (a) All bids... contractors, during the period following the opening of bids and before the award of the contract shall not be...
Advance Planning Briefing for Industry: Information Dominance for the Full Spectrum Force.
1997-05-29
Electronic Order Processing is projected. The procurement will be a FFP ID/IQ award. BRIEFER: LTC Mary Fuller, Product Manager, Army Small Computer Program...will be a Best Value evaluation with a minimum of 2 awards. The procurement is planned to run for 2 years for ordering, Electronic Order Processing is...procurement is planned to run for three years for ordering, Electronic Order Processing is projected. The procurement will be a FFP ID/IQ award. BRIEFER
Abbas, Richat; Hug, Bruce A; Leister, Cathie; Sonnichsen, Daryl
2012-07-01
Neratinib, a potent, low-molecular-weight, orally administered, irreversible, pan-ErbB receptor tyrosine kinase inhibitor has antitumor activity in ErbB2 + breast cancer. The objective of this study was to characterize the onset, severity, and duration of diarrhea after administration of neratinib 240 mg once daily (QD) and 120 mg twice daily (BID) for ≤14 days in healthy subjects. A randomized, double-blind, parallel-group, inpatient study was conducted in 50 subjects given oral neratinib either 240 mg QD or 120 mg BID with food for ≤14 days. The primary endpoint was the proportion of subjects with diarrhea of at least moderate severity (grade 2; 5-7 loose stools/day). In subjects with grade 2 diarrhea, fecal analytes were determined. Pharmacokinetic profiles were characterized for neratinib on Days 1 and 7. No severe (grade 3) diarrhea was reported. By Day 4, all subjects had grade 1 diarrhea. Grade 2 diarrhea occurred in 11/22 evaluable subjects (50 % [90 % confidence interval (CI): 28-72 %]) in the QD group and 17/23 evaluable subjects (74 % [90 % CI: 52-90 %]) in the BID group (P = 0.130). In fecal analyses, 18 % tested positive for hemoglobin and 46 % revealed fecal lactoferrin. Specimen pH was neutral to slightly alkaline. In pharmacokinetic analyses, Day 1 peak plasma concentration and Day 7 steady-state exposure were higher with the QD regimen than the BID regimen. In an exploratory analysis, ABCG2 genotype showed no correlation with severity or onset of diarrhea. Incidences and onsets of at least grade 1 and at least grade 2 diarrhea were not improved on BID dosing compared with QD dosing.
Falchook, Gerald; Kurzrock, Razelle; Gouw, Launce; Hong, David; McGregor, Kimberly A.; Zhou, Xiaofei; Shi, Hongliang; Fingert, Howard; Sharma, Sunil
2014-01-01
Background This phase 1b study evaluated an enteric-coated tablet (ECT) formulation of the investigational Aurora A kinase inhibitor, alisertib (MLN8237). Methods Patients with advanced, non-hematologic malignancies received oral alisertib ECT for 7 days BID followed by 14 days treatment-free (21-day cycles; 3+3 dose escalation schema). Objectives were to assess safety, pharmacokinetics, and antitumor activity, and to define a recommended phase 2 dose (RP2D) of alisertib. Results 24 patients were treated. Median age was 57 years. Patients received a median of 2 cycles (range 1–12). The RP2D was determined as 50 mg BID for 7 days (21-day cycles). A cycle 1 dose-limiting toxicity of grade 4 febrile neutropenia was observed in 1 of 13 patients at RP2D. The most common drug-related adverse event (AE) was neutropenia (50%). At doses ≥40 mg BID, 7 patients had drug-related AEs that were serious but largely reversible/manageable by dose reduction and supportive care, including 3 with febrile neutropenia. Pharmacokinetic data were available in 24 patients. Following administration of alisertib ECT, the plasma peak concentration of alisertib was achieved at ~3 h; systemic exposure increased with increasing dose over 10–60 mg BID. Mean t½ was ~21 h following multiple dosing. Renal clearance was negligible. Nine patients achieved stable disease (3.98*, 5.59, 1.28*, 2.56, 5.45*, 3.48, 3.15, 8.31, and 6.93* months; *censored). Conclusions Alisertib ECT was generally well tolerated in adults with advanced, non-hematologic malignancies. The RP2D is 50 mg BID for 7 days and is being evaluated in ongoing phase 2 studies. PMID:24879333
Fakih, Marwan G.; Pendyala, Lakshmi; Fetterly, Gerald; Toth, Karoli; Zwiebel, James A; Espinoza-Delgado, Igor; Litwin, Alan; Rustum, Youcef M.; Ross, Mary Ellen; Holleran, Julianne L.; Egorin, Merrill J.
2014-01-01
Purpose We conducted a phase I study to determine the maximum tolerated dose (MTD) of vorinostat in combination with fixed doses of 5-Fluorouracil (5-FU), leucovorin, and oxaliplatin (FOLFOX). Experimental Design Vorinostat was given PO BID for 1 week every 2 weeks. FOLFOX was given on days 4 and 5 of vorinostat. The vorinostat starting dose was 100 mg BID. Escalation occurred in cohorts of 3–6 patients. Pharmacokinetics of vorinostat, 5-FU, and oxaliplatin were studied. Results Twenty-one patients were enrolled. Thrombocytopenia, neutropenia, gastrointestinal toxicities, and fatigue increased in frequency and severity at higher dose-levels (DL) of vorinostat. Two of 4 evaluable patients at DL 4 (vorinostat 400 mg PO BID) developed dose-limiting fatigue. One of 10 evaluable patients at DL3 (vorinostat 300 mg PO BID) had dose-limiting fatigue, anorexia, and dehydration. There were significant relationships between vorinostat dose and AUC on days 1 and 5 (Pearson, < 0.001). Vorinostat AUC increased (p = 0.005) and clearance decreased (p = 0.003) on day 5 compared to day 1. The median Cmax of 5-FU at each DL increased significantly with increasing doses of vorinostat, suggesting a pharmacokinetic interaction between 5-FU and vorinostat. Vorinostat-induced thymidylate synthase modulation was not consistent; only two of six patients had a decrease in intra-tumoral thymidylate synthase expression by RT-PCR. Conclusions The MTD of vorinostat in combination with FOLFOX is 300 mg PO BID x 1 week every two weeks. Alternative vorinostat dosing schedules may be needed for optimal down-regulation of thymidylate synthase expression. PMID:19383814
The limits of market-based reforms in the NHS: the case of alternative providers in primary care.
Coleman, Anna; Checkland, Kath; McDermott, Imelda; Harrison, Stephen
2013-01-01
Historically, primary medical care in the UK has been delivered by general practitioners who are independent contractors, operating under a contract, which until 2004 was subject to little performance management. In keeping with the wider political impetus to introduce markets and competition into the NHS, reforms were introduced to allow new providers to bid for contracts to provide primary care services in England. These contracts known as 'Alternative Provider Medical Services', were encouraged by two centrally-driven rounds of procurement (2007/8 and 2008/9). This research investigated the commissioning and operation of such Alternative Providers of Primary Care (APPCs). Two qualitative case studies were undertaken in purposively sampled English Primary Care Trusts (PCTs) and their associated APPCs over 14 months (2009-10). We observed 65 hours of meetings, conducted 23 interviews with PCT and practice staff, and gathered relevant associated documentation. We found that the procurement and contracting process was costly and time-consuming. Extensive local consultation was undertaken, and there was considerable opposition in some areas. Many APPCs struggled to build up their patient list sizes, whilst over-performing on walk-in contracts. Contracting for APPCs was 'transactional', in marked contrast to the 'relational' contracting usually found in the NHS, with APPCs subject to tight performance management. These complicated and costly processes contrast to those experienced by traditionally owned GP partnerships. However, managers reported that the perception of competition had led existing practices to improve their services. The Coalition Government elected in 2010 is committed to 'Any Qualified Provider' of secondary care, and some commentators argue that this should also be applied to primary care. Our research suggests that, if this is to happen, a debate is needed about the operation of a market in primary care provision, including the trade-offs between transparent processes, fair procurement, performance assurance and cost.
The limits of market-based reforms in the NHS: the case of alternative providers in primary care
2013-01-01
Background Historically, primary medical care in the UK has been delivered by general practitioners who are independent contractors, operating under a contract, which until 2004 was subject to little performance management. In keeping with the wider political impetus to introduce markets and competition into the NHS, reforms were introduced to allow new providers to bid for contracts to provide primary care services in England. These contracts known as ‘Alternative Provider Medical Services’, were encouraged by two centrally-driven rounds of procurement (2007/8 and 2008/9). This research investigated the commissioning and operation of such Alternative Providers of Primary Care (APPCs). Methods Two qualitative case studies were undertaken in purposively sampled English Primary Care Trusts (PCTs) and their associated APPCs over 14 months (2009-10). We observed 65 hours of meetings, conducted 23 interviews with PCT and practice staff, and gathered relevant associated documentation. Results and conclusions We found that the procurement and contracting process was costly and time-consuming. Extensive local consultation was undertaken, and there was considerable opposition in some areas. Many APPCs struggled to build up their patient list sizes, whilst over-performing on walk-in contracts. Contracting for APPCs was ‘transactional’, in marked contrast to the ‘relational’ contracting usually found in the NHS, with APPCs subject to tight performance management. These complicated and costly processes contrast to those experienced by traditionally owned GP partnerships. However, managers reported that the perception of competition had led existing practices to improve their services. The Coalition Government elected in 2010 is committed to ‘Any Qualified Provider’ of secondary care, and some commentators argue that this should also be applied to primary care. Our research suggests that, if this is to happen, a debate is needed about the operation of a market in primary care provision, including the trade-offs between transparent processes, fair procurement, performance assurance and cost. PMID:23735051
Code of Federal Regulations, 2011 CFR
2011-10-01
... donors and organ placement and recovery. 486.344 Section 486.344 Public Health CENTERS FOR MEDICARE... Designation and Conditions for Coverage: Organ Procurement Organizations Organ Procurement Organization... placement and recovery. The OPO must have written protocols for donor evaluation and management and organ...
Code of Federal Regulations, 2010 CFR
2010-10-01
... donors and organ placement and recovery. 486.344 Section 486.344 Public Health CENTERS FOR MEDICARE... Designation and Conditions for Coverage: Organ Procurement Organizations Organ Procurement Organization... placement and recovery. The OPO must have written protocols for donor evaluation and management and organ...
42 CFR 423.286 - Rules regarding premiums.
Code of Federal Regulations, 2011 CFR
2011-10-01
... section for the difference between the bid and the national average monthly bid amount, any supplemental... percentage as specified in paragraph (b) of this section; and (2) National average monthly bid amount... reflect difference between bid and national average bid. If the amount of the standardized bid amount...
Sørensen, Nina N; Lassen, Anne D; Løje, Hanne; Tetens, Inge
2015-09-01
With political support from the Danish Organic Action Plan 2020, organic public procurement in Denmark is expected to increase. In order to evaluate changes in organic food procurement in Danish public kitchens, reliable methods are needed. The present study aimed to compare organic food procurement measurements by two methods and to collect and discuss baseline organic food procurement measurements from public kitchens participating in the Danish Organic Action Plan 2020. Comparison study measuring organic food procurement by applying two different methods, one based on the use of procurement invoices (the Organic Cuisine Label method) and the other on self-reported procurement (the Dogme method). Baseline organic food procurement status was based on organic food procurement measurements and background information from public kitchens. Public kitchens participating in the six organic food conversion projects funded by the Danish Organic Action Plan 2020 during 2012 and 2013. Twenty-six public kitchens (comparison study) and 345 public kitchens (baseline organic food procurement status). A high significant correlation coefficient was found between the two organic food procurement measurement methods (r=0·83, P<0·001) with measurements relevant for the baseline status. Mean baseline organic food procurement was found to be 24 % when including measurements from both methods. The results indicate that organic food procurement measurements by both methods were valid for the baseline status report of the Danish Organic Action Plan 2020. Baseline results in Danish public kitchens suggest there is room for more organic as well as sustainable public procurement in Denmark.
Changes in the organ procurement system in South Korea: effects on brain-dead donor numbers.
Lee, S D; Kim, J H
2009-11-01
In Korea, the Organ Transplantation Act came into effect in 2000, establishing the Korean Network for Organ Sharing (KONOS) with centralized authority for organ procurement as well as for approval of donors and recipients to ensure fair organ allocation. However, the number of brain-dead donors decreased sharply, and the organ allocation system proved inefficient. The government revised the Organ Transplantation Act in August 2002, introducing an incentive system. If a transplantation hospital formed a Committee for Brain Death Evaluation and a Hospital Organ Procurement Organization, it could receive a kidney from a brain dead-donor as an incentive to foster organ procurement regardless of the KONOS wait list. The government also launched a pilot brain-dead donor registry program to strengthen Hospital Organ Procurement Organization activity. If local hospitals collaborated with specialized hospitals in organ procurement, local hospitals obtained financial incentives. But because the organ shortage problem has not been resolved, the government has proposed four initiatives: first, broadening the incentive system, which makes it possible to give each specialized hospital a choice of one of eight organs from each donor as an incentive; second, development of an Independent Organ Procurement Organization; third introduction of an opt-out system; and last, improvement of the Committee for Brain Death Evaluation system. It is uncertain which initiatives will be adopted, but changes in organ procurement systems are nonetheless considered a key to solve the organ shortage problem in Korea.
48 CFR 14.202-8 - Electronic bids.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Electronic bids. 14.202-8... AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 14.202-8 Electronic bids. In accordance with subpart 4.5, contracting officers may authorize use of electronic commerce for submission of bids. If...
48 CFR 14.202-8 - Electronic bids.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Electronic bids. 14.202-8... AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 14.202-8 Electronic bids. In accordance with subpart 4.5, contracting officers may authorize use of electronic commerce for submission of bids. If...
48 CFR 14.202-8 - Electronic bids.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Electronic bids. 14.202-8... AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 14.202-8 Electronic bids. In accordance with subpart 4.5, contracting officers may authorize use of electronic commerce for submission of bids. If...
48 CFR 14.202-8 - Electronic bids.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Electronic bids. 14.202-8... AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 14.202-8 Electronic bids. In accordance with subpart 4.5, contracting officers may authorize use of electronic commerce for submission of bids. If...
48 CFR 14.202-8 - Electronic bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Electronic bids. 14.202-8... AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 14.202-8 Electronic bids. In accordance with subpart 4.5, contracting officers may authorize use of electronic commerce for submission of bids. If...
48 CFR 14.202-1 - Bidding time.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Bidding time. 14.202-1... AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 14.202-1 Bidding time. (a) Policy. A reasonable time for prospective bidders to prepare and submit bids shall be allowed in all invitations, consistent...
48 CFR 14.202-1 - Bidding time.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Bidding time. 14.202-1... AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 14.202-1 Bidding time. (a) Policy. A reasonable time for prospective bidders to prepare and submit bids shall be allowed in all invitations, consistent...
48 CFR 14.202-1 - Bidding time.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Bidding time. 14.202-1... AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 14.202-1 Bidding time. (a) Policy. A reasonable time for prospective bidders to prepare and submit bids shall be allowed in all invitations, consistent...
48 CFR 14.202-1 - Bidding time.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Bidding time. 14.202-1... AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 14.202-1 Bidding time. (a) Policy. A reasonable time for prospective bidders to prepare and submit bids shall be allowed in all invitations, consistent...
48 CFR 14.202-1 - Bidding time.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Bidding time. 14.202-1... AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 14.202-1 Bidding time. (a) Policy. A reasonable time for prospective bidders to prepare and submit bids shall be allowed in all invitations, consistent...
Nustad, Jill; Adams, Troy; Moore, Monique
2008-01-01
This study examined and compared sources of health-related information accessed by female college students with and without body image distortions, and the believability of those sources. Survey data from the American College Health Association, National College Health Assessment were studied retrospectively (N = 27,648). Body image distorted (BID) and non-BID students' most frequent health information sources were parents (76.1% BID; 77.1% non-BID) and internet (70.3% BID; 69.5% non-BID). Believability was greatest for health educators (90.6% BID; 91.1% non-BID) and lowest for television (14.4% BID; 14.5% non-BID). Health intervention strategies for college women should market to parents and teach recognition of credible internet sources of health information.
Dynamic imaging of interaction between protein 14-3-3 and Bid in living cells
NASA Astrophysics Data System (ADS)
Chen, Tongsheng; Xing, Da; Wang, Jinjun
2006-02-01
The 14-3-3 proteins are known to sequester certain pro-apoptotic members of this family. BH3- interacting domain death agonist (Bid) may contribute to tumor necrosis factor α(TNF-α)-induced neuronal death, although regulation by 14-3-3 has not been reported. In this study we examined whether 14-3-3 proteins interact with Bid/tBid during TNF-α-induced cell death. The TNF-αtriggered Bid cleavage and tBid translocated to mitochondria. Human lung adenocarcinoma cells were co-transfected with both CFP-Bid and 14-3-3-YFP plasmids, and the dynamical interaction between the Bid/tBid and 14-3-3 were performed on laser confocal fluorescence microscope in single living cell during TNF-α-induced cell apoptosis. The Bid distribute equally only in the cytoplasm of healthy cells, and the 14-3-3 protein distribute not only in the cytoplasm but also in the nucleus of healthy cells. Our data showed that the tBid aggregate, but the 14-3-3 protein does not aggregate as the tBid, and the 14-3-3 protein separate from the aggregated tBid, implying that the 14-3-3 proteins do not interact with the aggregated tBid after TNF-αtreatment.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-10
... of their bids or bidding strategies from the short-form application filing deadline to the post... communication of bids or bidding strategies is limited to one applicant's bids or bidding strategies, it may unfairly disadvantage the other bidders in the market by creating an asymmetry of information. Section 1...
Strand, Vibeke; van Vollenhoven, Ronald F; Lee, Eun Bong; Fleischmann, Roy; Zwillich, Samuel H; Gruben, David; Koncz, Tamas; Wilkinson, Bethanie; Wallenstein, Gene
2016-06-01
To evaluate effects of tofacitinib or adalimumab on patient-reported outcomes (PROs) in patients with moderate to severe RA and inadequate responses to MTX. In this 12-month, phase 3, randomized controlled trial (ORAL Standard), patients (n = 717) receiving background MTX were randomized to tofacitinib 5 or 10 mg twice daily (BID), adalimumab 40 mg once every 2 weeks or placebo. PROs included HAQ-Disability Index, Patient Global Assessment of Arthritis, Patient Assessment of Arthritis Pain, health-related quality of life (Short Form-36 [SF-36]), fatigue (Functional Assessment of Chronic Illness Therapy-Fatigue) and sleep (Medical Outcomes Study-Sleep). At month 3, tofacitinib 10 mg BID treatment resulted in significant changes from baseline vs placebo across all PROs, sustained to month 12, with the highest number of patients reporting improvements ⩾minimum clinically important differences vs placebo (P < 0.05). Changes from baseline at month 3 with tofacitinib 5 mg BID and adalimumab were similar and statistically significant vs placebo across most PROs, excluding SF-36 Mental Component Score and Social Functioning, Role Emotional, and Mental Health domains, with significantly more patients reporting improvements ⩾minimum clinically important differences. Numbers Needed to Treat were lowest for tofacitinib 10 mg BID and similar between tofacitinib 5 mg BID and adalimumab. Patients with moderate to severe RA and inadequate responses to MTX reported improvements across a broad range of PROs with tofacitinib 5 and 10 mg BID and adalimumab that were significantly superior to placebo. © The Author 2016. Published by Oxford University Press on behalf of the British Society for Rheumatology.
Strand, Vibeke; van Vollenhoven, Ronald F.; Lee, Eun Bong; Fleischmann, Roy; Zwillich, Samuel H.; Gruben, David; Koncz, Tamas; Wilkinson, Bethanie
2016-01-01
Objective. To evaluate effects of tofacitinib or adalimumab on patient-reported outcomes (PROs) in patients with moderate to severe RA and inadequate responses to MTX. Methods. In this 12-month, phase 3, randomized controlled trial (ORAL Standard), patients (n = 717) receiving background MTX were randomized to tofacitinib 5 or 10 mg twice daily (BID), adalimumab 40 mg once every 2 weeks or placebo. PROs included HAQ-Disability Index, Patient Global Assessment of Arthritis, Patient Assessment of Arthritis Pain, health-related quality of life (Short Form-36 [SF-36]), fatigue (Functional Assessment of Chronic Illness Therapy-Fatigue) and sleep (Medical Outcomes Study-Sleep). Results. At month 3, tofacitinib 10 mg BID treatment resulted in significant changes from baseline vs placebo across all PROs, sustained to month 12, with the highest number of patients reporting improvements ⩾minimum clinically important differences vs placebo (P < 0.05). Changes from baseline at month 3 with tofacitinib 5 mg BID and adalimumab were similar and statistically significant vs placebo across most PROs, excluding SF-36 Mental Component Score and Social Functioning, Role Emotional, and Mental Health domains, with significantly more patients reporting improvements ⩾minimum clinically important differences. Numbers Needed to Treat were lowest for tofacitinib 10 mg BID and similar between tofacitinib 5 mg BID and adalimumab. Conclusion. Patients with moderate to severe RA and inadequate responses to MTX reported improvements across a broad range of PROs with tofacitinib 5 and 10 mg BID and adalimumab that were significantly superior to placebo. PMID:26929445
Industrial application experiment series
NASA Technical Reports Server (NTRS)
Bluhm, S. A.
1981-01-01
Two procurements within the Industrial Application Experiment Series of the Thermal Power Systems Project are discussed. The first procurement, initiated in April 1980, resulted in an award to the Applied Concepts Corporation for the Capital Concrete Experiment: two Fresnel concentrating collectors will be evaluated in single-unit installations at the Jet Propulsion Laboratory Parabolic Dish Test Site and at Capitol Concrete Products, Topeka, Kansas. The second procurement, initiated in March 1981, is titled, "Thermal System Engineering Experiment B." The objective of the procurement is the rapid deployment of developed parabolic dish collectors.
Terror in the Board Room: The Bid-Opening Process
ERIC Educational Resources Information Center
Shoop, James
2009-01-01
Competitive bids and the bid-opening process are the cornerstones of public school purchasing. The bid-opening process does not begin on the day of the bid opening. It begins with good planning by the purchasing agent to ensure that the advertised bid complies with the public school contracts law. In New Jersey, that raises the following…
48 CFR 14.408-6 - Equal low bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Equal low bids. 14.408-6... AND CONTRACT TYPES SEALED BIDDING Opening of Bids and Award of Contract 14.408-6 Equal low bids. (a) Contracts shall be awarded in the following order of priority when two or more low bids are equal in all...
COMPETITIVE BIDDING IN MEDICARE ADVANTAGE: EFFECT OF BENCHMARK CHANGES ON PLAN BIDS
Song, Zirui; Landrum, Mary Beth; Chernew, Michael E.
2013-01-01
Bidding has been proposed to replace or complement the administered prices in Medicare pays to hospitals and health plans. In 2006, the Medicare Advantage program implemented a competitive bidding system to determine plan payments. In perfectly competitive models, plans bid their costs and thus bids are insensitive to the benchmark. Under many other models of competition, bids respond to changes in the benchmark. We conceptualize the bidding system and use an instrumental variable approach to study the effect of benchmark changes on bids. We use 2006–2010 plan payment data from the Centers for Medicare and Medicaid Services, published county benchmarks, actual realized fee-for-service costs, and Medicare Advantage enrollment. We find that a $1 increase in the benchmark leads to about a $0.53 increase in bids, suggesting that plans in the Medicare Advantage market have meaningful market power. PMID:24308881
Competitive bidding in Medicare Advantage: effect of benchmark changes on plan bids.
Song, Zirui; Landrum, Mary Beth; Chernew, Michael E
2013-12-01
Bidding has been proposed to replace or complement the administered prices that Medicare pays to hospitals and health plans. In 2006, the Medicare Advantage program implemented a competitive bidding system to determine plan payments. In perfectly competitive models, plans bid their costs and thus bids are insensitive to the benchmark. Under many other models of competition, bids respond to changes in the benchmark. We conceptualize the bidding system and use an instrumental variable approach to study the effect of benchmark changes on bids. We use 2006-2010 plan payment data from the Centers for Medicare and Medicaid Services, published county benchmarks, actual realized fee-for-service costs, and Medicare Advantage enrollment. We find that a $1 increase in the benchmark leads to about a $0.53 increase in bids, suggesting that plans in the Medicare Advantage market have meaningful market power. Copyright © 2013 Elsevier B.V. All rights reserved.
Competitive bidding for Medicare Part B clinical laboratory services.
Kautter, John; Pope, Gregory C
2014-06-01
The traditional Medicare fee-for-service program may be able to purchase clinical laboratory test services at a lower cost through competitive bidding. Demonstrations of competitive bidding for clinical laboratory tests have been twice mandated or authorized by Congress but never implemented. This article provides a summary and review of the final design of the laboratory competitive bidding demonstration mandated by the Medicare Modernization Act of 2003. The design was analogous to a sealed bid (first price), clearing price auction. Design elements presented include covered laboratory tests and beneficiaries, laboratory bidding and payment status under the demonstration, composite bids, determining bidding winners and the demonstration fee schedule, and quality under the demonstration. Expanded use of competitive bidding in Medicare, including specifically for clinical laboratory tests, has been recommended in some proposals for Medicare reform. The presented design may be a useful point of departure if Medicare clinical laboratory competitive bidding is revived in the future.
Fidler, Meredith C; Sanchez, Matilde; Raether, Brian; Weissman, Neil J; Smith, Steven R; Shanahan, William R; Anderson, Christen M
2011-10-01
Lorcaserin is a novel selective agonist of the serotonin 2C receptor. Our objective was to evaluate the effects of lorcaserin on body weight, cardiovascular risk factors, and safety in obese and overweight patients. This randomized, placebo-controlled, double-blind, parallel arm trial took place at 97 U.S. research centers. Patients included 4008 patients, aged 18-65 yr, with a body mass index between 30 and 45 kg/m(2) or between 27 and 29.9 kg/m(2) with an obesity-related comorbid condition. Patients were randomly assigned in a 2:1:2 ratio to receive lorcaserin 10 mg twice daily (BID), lorcaserin 10 mg once daily (QD), or placebo. All patients received diet and exercise counseling. The ordered primary endpoints were proportion of patients achieving at least 5% reduction in body weight, mean change in body weight, and proportion of patients achieving at least 10% reduction in body weight at 1 yr. Serial echocardiograms monitored heart valve function. Significantly more patients treated with lorcaserin 10 mg BID and QD lost at least 5% of baseline body weight (47.2 and 40.2%, respectively) as compared with placebo (25.0%, P < 0.001 vs. lorcaserin BID). Least squares mean (95% confidence interval) weight loss with lorcaserin BID and QD was 5.8% (5.5-6.2%) and 4.7% (4.3-5.2%), respectively, compared with 2.8% (2.5-3.2%) with placebo (P < 0.001 vs. lorcaserin BID; least squares mean difference, 3.0%). Weight loss of at least 10% was achieved by 22.6 and 17.4% of patients receiving lorcaserin 10 mg BID and QD, respectively, and 9.7% of patients in the placebo group (P < 0.001 vs. lorcaserin BID). Headache, nausea, and dizziness were the most common lorcaserin-related adverse events. U.S. Food and Drug Administration-defined echocardiographic valvulopathy occurred in 2.0% of patients on placebo and 2.0% on lorcaserin 10 mg BID. Lorcaserin administered in conjunction with a lifestyle modification program was associated with dose-dependent weight loss that was significantly greater than with placebo.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What criteria does MMS use for selecting bidding systems and bidding system components? 260.130 Section 260.130 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OUTER CONTINENTAL SHELF OIL AND GAS LEASING Bidding Systems Bidding System Selection Criteria §...
The development of the Garden Banks block 388 FPF mooring system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dove, P.G.S.; Librino, F.; Scovell, D.C.
1995-12-01
This paper discusses work conducted during the design, procurement and installation of Enserch Exploration, Inc.`s Garden Banks 388 FPF mooring system. The design began with the execution of a trade-off study evaluating and comparing previously installed floating production moorings in the Gulf of Mexico, coupled with evaluation of new concepts and emphasis on cost effective solutions. The design effort involved dynamic analysis and wind tunnel and model tank testing, all in accordance with the newly completed API document RP 2FP1. Inspection of various components from the Placid GC-29 FPS moorings (installed in 1987 and recovered in 1990) determined that sectionsmore » of chain, jacketed spiral strand wire rope, submersible buoys and connectors could be reused with suitable refurbishment. The excellent condition of the rig`s onboard winching system also resulted in the reuse of the windlasses, with specified upgrades. Because a sufficient amount of used wire was not available, a bare spiral strand wire rope construction was adopted, including zinc anodes in the new sections, rather than jacketed strand. The lack of cost effective installation vessels in the Gulf of Mexico at the time of the installation bid posed challenges to Enserch. However, an innovative preset mooring installation scheme involving Heeremac`s SSCV Balder on its own moorings was adopted. Since the vessel was already in the Gulf of Mexico on contract for other projects, a cost effective contract was negotiated. The results of this effort led to considerable cost savings for Enserch, compared to conventional FPF mooring systems previously installed in the Gulf of Mexico.« less
Real-time single cell analysis of Bid cleavage and translocation in cisplatin-induced apoptosis
NASA Astrophysics Data System (ADS)
Liu, Lei; Xing, Da; Pei, Yihui; Chen, Wei R.
2007-02-01
Cancer cell apoptosis can be induced by cisplatin, an efficient anticancer agent. However, its mechanism is not fully understood. Bcl-2 homology domain (BH) 3-only proteins couple stress signals to mitochondrial apoptotic pathways. Calpain-mediated cleavage of the BH3-only protein Bid into a 14 kD truncated protein (tBid) has been implicated in cisplatin-induced apoptotic pathway. We utilized a recombinant fluorescence resonance energy transfer (FRET) Bid probe to determine the kinetics of Bid cleavage during cisplatin-induced apoptosis in ASTC-a-1 cells. The cells were also co-transfected with Bid-CFP and DsRed-Mit to dynamically detect tBid translocation. Cells showed a cleavage of the Bid-FRET probe occurring at about 4-5 h after treated with 20 µM cisplatin. Cleavage of the Bid-FRET probe coincided with a translocation of tBid from the cytosolic to the mitochondria, and the translocation lasted about 1.5 h. Using real-time single-cell analysis, we first observed the kinetics of Bid cleavage and translocation to mitochondria in living cells during cisplatin-induced apoptosis.
Baughn, Daniel; Auerbach, Stephen M; Siminoff, Laura A
2010-09-01
Interpersonal relations with health care providers influence families' decisions to consent to solid-organ donation. However, previous research has been based on retrospective interviews with donation-eligible families and has not directly examined the interpersonal interactions between families and organ procurement coordinators. To increase understanding of the interpersonal interaction between procurement coordinators and families during the organ donation discussion, with special attention to the influence of the sex and race of the procurement coordinator and the race of the potential donor's family. A descriptive study in which standardized patients portrayed family members interacting with actual procurement coordinators in simulated donation request scenarios. Thirty-three videotaped interactions between standardized patients and 17 procurement coordinators involving 2 different scenarios depicting deceased donation were evaluated. Video recordings were rated by independent coders. Coders completed the Impact Message Inventory-Form C, the Participatory Style of Physician Scale, and the Siminoff Communication and Content and Affect Program-Global Observer Ratings scale. African American procurement coordinators, particularly African American women, were rated as more controlling and work-oriented than white procurement coordinators. Male procurement coordinators were more affiliative with the white family than the African American family, whereas female procurement coordinators were slightly less affiliative with the white family. African American procurement coordinators expressed more positive affect when interacting with the African American family than the white family, whereas the opposite was true for white procurement coordinators. Research is needed to cross-validate these exploratory findings and further examine cultural mistrust between procurement coordinators and families of ethnic minorities, especially given the negative attitudes of many minorities toward donation.
Management systems research study
NASA Technical Reports Server (NTRS)
Bruno, A. V.
1975-01-01
The development of a Monte Carlo simulation of procurement activities at the NASA Ames Research Center is described. Data cover: simulation of the procurement cycle, construction of a performance evaluation model, examination of employee development, procedures and review of evaluation criteria for divisional and individual performance evaluation. Determination of the influences and apparent impact of contract type and structure and development of a management control system for planning and controlling manpower requirements.
Cost effective nuclear commercial grade dedication
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maletz, J.J.; Marston, M.J.
1991-01-01
This paper describes a new computerized database method to create/edit/view specification technical data sheets (mini-specifications) for procurement of spare parts for nuclear facility maintenance and to develop information that could support possible future facility life extension efforts. This method may reduce cost when compared with current manual methods. The use of standardized technical data sheets (mini-specifications) for items of the same category improves efficiency. This method can be used for a variety of tasks, including: Nuclear safety-related procurement; Non-safety related procurement; Commercial grade item procurement/dedication; Evaluation of replacement items. This program will assist the nuclear facility in upgrading its procurementmore » activities consistent with the recent NUMARC Procurement Initiative. Proper utilization of the program will assist the user in assuring that the procured items are correct for the applications, provide data to assist in detecting fraudulent materials, minimize human error in withdrawing database information, improve data retrievability, improve traceability, and reduce long-term procurement costs.« less
Shimizu, Toshio; Fukuoka, Kazuya; Takeda, Masayuki; Iwasa, Tutomu; Yoshida, Takeshi; Horobin, Joanna; Keegan, Mitchell; Vaickus, Lou; Chavan, Ajit; Padval, Mahesh; Nakagawa, Kazuhiko
2016-05-01
VS-6063 (also known as defactinib or PF-04554878) is a second-generation inhibitor of focal adhesion kinase and proline-rich tyrosine kinase-2. This phase 1 study evaluated the safety and tolerability, pharmacokinetics, and clinical activity of VS-6063 in Japanese subjects with advanced solid tumor malignancies in a first-in-Asian study setting. VS-6063 was administered orally twice daily (b.i.d.) in 21-day cycles to cohorts of three subjects each with a standard 3 + 3 dose-escalation design until disease progression or unacceptable toxicity. Blood samples for pharmacokinetics were collected on Day 1 and 15. The assessments were performed using CTCAE v4.0 for adverse events (AEs), and the Response Evaluation Criteria In Solid Tumors, version v1.1 (RECIST v1.1) for tumor response. Nine patients were treated across three dose levels (200-600 mg BID). No dose-limiting toxicities were observed at any dose level. Most frequent treatment-related AEs were Grade 1/2 unconjugated hyperbilirubinemia, fatigue, decreased appetite, and diarrhea. Only one subject in the 200 mg BID cohort experienced reversible and transient Grade 3 unconjugated hyperbilirubinemia. PK analyses confirmed that the exposure at the recommended Phase 2 dose (RP2D) of 400 mg BID was comparable with exposures previously reported in non-Japanese subjects. Durable stable disease of approximately 24 weeks was confirmed in two subjects (malignant mesothelioma and rectal cancer). VS-6063 was well tolerated at all dose levels investigated in this first-in-Asian study. These data support the administration of VS-6063 to Japanese subjects at the RP2D in clinical trials involving solid tumor malignancies.
48 CFR 14.203 - Methods of soliciting bids.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Methods of soliciting bids. 14.203 Section 14.203 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 14.203 Methods of soliciting bids. ...
48 CFR 14.203 - Methods of soliciting bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Methods of soliciting bids. 14.203 Section 14.203 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 14.203 Methods of soliciting bids. ...
Field evaluation of roller integrated intelligent compaction monitoring
DOT National Transportation Integrated Search
2016-05-01
DOTD conducted a demonstration : project to evaluate intelligent compaction (IC). The : project developed specifications, which allo : wed and incorporated : the IC rollers on the : project. The specification went through th : e competitive bidding p...
Municipal consortia for medicine procurement: impact on the stock-out and budget.
Amaral, Silvâni Maria Sehnem de; Blatt, Carine Raquel
2011-08-01
The study evaluated the impact of the consortia on the budget and shortage of medicines for the basic pharmaceutical assistance component in Indaial municipality, Southern Brazil. The number of items with a stock out for at least one day decreased by 12% from 2008 to 2007 and 48% from 2009 to 2007; total costs decreased by 33%, when comparing procurement by consortia (2009) to municipal procurement (2007), and by 18% when compared to the average values of the 2009 Health Prices Database from the Ministry of Health. The procurement of medicines by the consortia decreased stock outs and represented an economy of scale, allowing for the procurement of a greater quantity of products with the same budget.
Concannon, Caoimhin G.; Rehm, Markus; Kögel, Donat; Prehn, Jochen H. M.
2008-01-01
Background The BH3-only protein Bid is an important component of death receptor-mediated caspase activation. Bid is cleaved by caspase-8 or -10 into t-Bid, which translocates to mitochondria and triggers the release of caspase-activating factors. Bid has also been reported to be cleaved by other proteases. Methodology/Principal Findings To test the hypothesis that Bid is a central mediator of stress-induced apoptosis, we investigated the effects of a small molecule Bid inhibitor on stress-induced apoptosis, and generated HeLa cells deficient for Bid. Stable knockdown of bid lead to a pronounced resistance to Fas/CD95- and TRAIL-induced caspase activation and apoptosis, and significantly increased clonogenic survival. While Bid-deficient cells were equally sensitive to ER stress-induced apoptosis, they showed moderate, but significantly reduced levels of apoptosis, as well as increased clonogenic survival in response to the genotoxic drugs Etoposide, Oxaliplatin, and Doxorubicin. Similar effects were observed using the Bid inhibitor BI6C9. Interestingly, Bid-deficient cells were dramatically protected from apoptosis when subtoxic concentrations of ER stressors, Etoposide or Oxaliplatin were combined with subtoxic TRAIL concentrations. Conclusions/Significance Our data demonstrate that Bid is central for death receptor-induced cell death and participates in anti-cancer drug-induced apoptosis in human cervical cancer HeLa cells. They also show that the synergistic effects of TRAIL in combination with either ER stressors or genotoxic anti-cancer drugs are nearly exclusively mediated via an increased activation of Bid-induced apoptosis signalling. PMID:18665234
Dynamic Interaction of cBid with Detergents, Liposomes and Mitochondria
Bleicken, Stephanie; García-Sáez, Ana J.; Conte, Elena; Bordignon, Enrica
2012-01-01
The BH3-only protein Bid plays a key role in the induction of mitochondrial apoptosis, but its mechanism of action is still not completely understood. Here we studied the two main activation events of Bid: Caspase-8 cleavage and interaction with the membrane bilayer. We found a striking reversible behaviour of the dissociation-association events between the Bid fragments p15 and p7. Caspase-8 cleavage does not induce per se separation of the two Bid fragments, which remain in a stable complex resembling the full length Bid. Detergents trigger a complete dissociation, which can be fully reversed by detergent removal in a range of protein concentrations from 100 µM down to 500 nM. Incubation of cBid with cardiolipin-containing liposomes leads to partial dissociation of the complex. Only p15 (tBid) fragments are found at the membrane, while p7 shows no tendency to interact with the bilayer, but complete removal of p7 strongly increases the propensity of tBid to become membrane-associated. Despite the striking structural similarities of inactive Bid and Bax, Bid does not form oligomers and reacts differently in the presence of detergents and membranes, highlighting clear differences in the modes of action of the two proteins. The partial dissociation of cBid triggered by the membrane is suggested to depend on the strong and specific interaction between p15 and p7. The reversible disassembly and re-assembly of the cBid molecules at the membrane was as well proven by EPR using spin labeled cBid in the presence of isolated mitochondria. The observed dynamic dissociation of the two Bid fragments could allow the assistance to the pore-forming Bax to occur repeatedly and may explain the proposed “hit-and-run" mode of action of Bid at the bilayer. PMID:22540011
DuBois, Janet; Dover, Jeffrey S; Jones, Terry M; Weiss, Robert A; Berk, David R; Ahluwalia, Gurpreet
2018-03-01
Rosacea is a chronic dermatologic condition with limited treatment options. This phase 2 study evaluated the optimal oxymetazoline dosing regimen in patients with moderate to severe persistent facial erythema of rosacea. Patients were randomly assigned to oxymetazoline cream, 0.5%, 1.0%, or 1.5%, or vehicle, administered once daily (QD) or twice daily (BID) for 28 consecutive days. The primary efficacy endpoint was the proportion of patients with ≥2-grade improvement from baseline on the Clinician Erythema Assessment (CEA) and the Subject Self-Assessment of erythema (SSA-1) on day 28. Safety assessments included treatment-emergent adverse events and dermal tolerability. A total of 356 patients were treated (mean age, 50.0 years; 80.1% female). The proportions of patients achieving the primary endpoint were significantly higher with oxymetazoline 0.5% QD (P=0.049), 1.0% QD (P=0.006), 1.5% QD (P=0.012), 1.0% BID (P=0.021), and 1.5% BID (P=0.006) versus their respective vehicles. For both QD and BID dosing, the efficacy of oxymetazoline 1.0% was greater than the 0.5% dose and comparable to the 1.5% dose. Safety and application-site tolerability were similar across groups. Short-term treatment period. Oxymetazoline 1.0% QD provided the optimal dosing regimen and was selected for evaluation in phase 3 clinical studies. J Drugs Dermatol. 2018;17(3):308-316.
48 CFR 14.101 - Elements of sealed bidding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Elements of sealed bidding. 14.101 Section 14.101 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Use of Sealed Bidding 14.101 Elements of sealed bidding...
48 CFR 14.101 - Elements of sealed bidding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Elements of sealed bidding. 14.101 Section 14.101 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Use of Sealed Bidding 14.101 Elements of sealed bidding...
48 CFR 14.101 - Elements of sealed bidding.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Elements of sealed bidding. 14.101 Section 14.101 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Use of Sealed Bidding 14.101 Elements of sealed bidding...
48 CFR 14.101 - Elements of sealed bidding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Elements of sealed bidding. 14.101 Section 14.101 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Use of Sealed Bidding 14.101 Elements of sealed bidding...
48 CFR 14.101 - Elements of sealed bidding.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Elements of sealed bidding. 14.101 Section 14.101 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Use of Sealed Bidding 14.101 Elements of sealed bidding...
48 CFR 2014.407 - Mistakes in bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Mistakes in bids. 2014.407 Section 2014.407 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Opening of Bids and Award of Contract 2014.407 Mistakes in bids. ...
Compare, Debora; Rocco, Alba; Sgamato, Costantino; Coccoli, Pietro; Campo, Salvatore Maria Antonio; Nazionale, Immacolata; Larussa, Tiziana; Luzza, Francesco; Chiodini, Paolo; Nardone, Gerardo
2015-04-01
Proton pump inhibitors may foster intestinal dysbiosis and related bowel symptoms. To evaluate the effect of Lactobacillus paracasei F19 on bowel symptom onset in patients on long-term proton pump inhibitors. In this randomized, double-blind, placebo-controlled study, patients with typical gastroesophageal reflux disease symptoms receiving pantoprazole 40 mg/d for six months were randomly assigned to receive: (A) Lactobacillus paracasei F19 bid for three days/week for six months; (B) placebo bid for three days/week for six months; (C) Lactobacillus paracasei F19 bid for three days/week for three months and placebo bid for three days/week for the following three months; (D) placebo bid for three days/week for three months and Lactobacillus paracasei F19 bid for three days/week for the following three months. Bloating, flatulence, abdominal pain and bowel habit were assessed monthly. 100/312 patients were enrolled. In the parallel groups, the treatment-by-time interaction affected bloating (p = 0.015), while Lactobacillus paracasei F19 treatment alone affected flatulence (p = 0.011). Moreover, the treatment-by-time interaction significantly affected the mean score of bloating (p = 0.01) and flatulence (p < 0.0001), the mean stool form (p = 0.03) and mean stool frequency/week (p = 0.016). Analysis of the cross-over groups, limited to the first three months because of carry-over effect, confirmed these results. Lactobacillus paracasei F19 supplementation prevents bowel symptom onset in patients on long-term proton pump inhibitors. Copyright © 2015 Editrice Gastroenterologica Italiana S.r.l. Published by Elsevier Ltd. All rights reserved.
36 CFR 223.88 - Bidding methods.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Bidding methods. 223.88... Sale Contracts Advertisement and Bids § 223.88 Bidding methods. (a) Competitive sales of National Forest timber shall be offered through either sealed or oral auction bidding. The method chosen for each...
36 CFR 223.88 - Bidding methods.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Bidding methods. 223.88... Sale Contracts Advertisement and Bids § 223.88 Bidding methods. (a) Competitive sales of National Forest timber shall be offered through either sealed or oral auction bidding. The method chosen for each...
ERIC Educational Resources Information Center
Meister, J. Patrick
2011-01-01
Consider an auction in which one potential buyer wishes to participate, but the other potential buyer would rather the bidding not start. However, once bidding starts, the reluctant firm participates (submits "bluff bids") simply to make the eventual winner pay more. This incentive exists when the marginal effect of the winning bid is to increase…
36 CFR 223.88 - Bidding methods.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Bidding methods. 223.88... Sale Contracts Advertisement and Bids § 223.88 Bidding methods. (a) Competitive sales of National Forest timber shall be offered through either sealed or oral auction bidding. The method chosen for each...
36 CFR 223.88 - Bidding methods.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Bidding methods. 223.88... Sale Contracts Advertisement and Bids § 223.88 Bidding methods. (a) Competitive sales of National Forest timber shall be offered through either sealed or oral auction bidding. The method chosen for each...
24 CFR 291.304 - Bidding process.
Code of Federal Regulations, 2012 CFR
2012-04-01
... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF HUD-ACQUIRED SINGLE FAMILY PROPERTY Sale of HUD-Held Single... HUD in accordance with instructions in the bid package for a particular sale. (b) Effect of bid. By... bid package. Along with the bid, the bidder must submit an executed copy of the Loan Sale Agreement...
24 CFR 291.304 - Bidding process.
Code of Federal Regulations, 2014 CFR
2014-04-01
... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF HUD-ACQUIRED SINGLE FAMILY PROPERTY Sale of HUD-Held Single... HUD in accordance with instructions in the bid package for a particular sale. (b) Effect of bid. By... bid package. Along with the bid, the bidder must submit an executed copy of the Loan Sale Agreement...
24 CFR 291.304 - Bidding process.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF HUD-ACQUIRED SINGLE FAMILY PROPERTY Sale of HUD-Held Single... HUD in accordance with instructions in the bid package for a particular sale. (b) Effect of bid. By... bid package. Along with the bid, the bidder must submit an executed copy of the Loan Sale Agreement...
48 CFR 814.404-2 - Rejection of individual bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Rejection of individual... Rejection of individual bids. (a) When a contracting officer finds a bid that is being considered for an... nonresponsive an individual bid that is not in compliance with the Government's bid acceptance time, since...
24 CFR 291.304 - Bidding process.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Bidding process. 291.304 Section 291.304 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Family Mortgage Loans § 291.304 Bidding process. (a) Submission of bids. All bids must be submitted to...
Research on Bidding Decision-making of International Public-Private Partnership Projects
NASA Astrophysics Data System (ADS)
Hu, Zhen Yu; Zhang, Shui Bo; Liu, Xin Yan
2018-06-01
In order to select the optimal quasi-bidding project for an investment enterprise, a bidding decision-making model for international PPP projects was established in this paper. Firstly, the literature frequency statistics method was adopted to screen out the bidding decision-making indexes, and accordingly the bidding decision-making index system for international PPP projects was constructed. Then, the group decision-making characteristic root method, the entropy weight method, and the optimization model based on least square method were used to set the decision-making index weights. The optimal quasi-bidding project was thus determined by calculating the consistent effect measure of each decision-making index value and the comprehensive effect measure of each quasi-bidding project. Finally, the bidding decision-making model for international PPP projects was further illustrated by a hypothetical case. This model can effectively serve as a theoretical foundation and technical support for the bidding decision-making of international PPP projects.
Caremans, Jeroen; Hamans, Evert; Muylle, Ludo; Van de Heyning, Paul; Van Rompaey, Vincent
2016-06-01
Allograft tympano-ossicular systems (ATOS) have proven their use over many decades in tympanoplasty and reconstruction after resection of cholesteatoma. The transcranial bone plug technique has been used in the past 50 years to procure en bloc ATOS (tympanic membrane with malleus, incus and stapes attached). Recently, our group reported the feasibility of the endoscopic procurement technique. The aim of this study was to assess whether clinical outcome is equivalent in ATOS acquired by using the endoscopic procurement technique compared to ATOS acquired by using the transcranial technique. A double-blind randomized controlled audit was performed in a tertiary referral center in patients that underwent allograft tympanoplasty because of chronic otitis media with and without cholesteatoma. Allograft epithelialisation was evaluated at the short-term postoperative visit by microscopic examination. Failures were reported if reperforation was observed. Fifty patients underwent allograft tympanoplasty: 34 received endoscopically procured ATOS and 16 received transcranially procured ATOS. One failed case was observed, in the endoscopic procurement group. We did not observe a statistically significant difference between the two groups in failure rate. This study demonstrates equivalence of the clinical outcome of allograft tympanoplasty using either endoscopic or transcranial procured ATOS and therefore indicates that the endoscopic technique can be considered the new standard procurement technique. Especially because the endoscopic procurement technique has several advantages compared to the former transcranial procurement technique: it avoids risk of prion transmission and it is faster while lacking any noticeable incision.
Code of Federal Regulations, 2011 CFR
2011-07-01
... SALES OF SURPLUS PERSONAL PROPERTY § 172.5 Procedures. (a) Required bid deposits. When a sale conducted... apply: (1) Term bid. This type of bid deposit is applicable when the sale involves the purchase of scrap... of 20 percent of the bid shall accompany the bid. (b) Payment terms. When a sale conducted by a DoD...
7 CFR 1780.95 - Public bidding on bonds.
Code of Federal Regulations, 2010 CFR
2010-01-01
... public bidding. The Agency will not submit a bid at the advertised sale unless required by State law, nor... 7 Agriculture 12 2010-01-01 2010-01-01 false Public bidding on bonds. 1780.95 Section 1780.95... Bonds and Bond Transcript Documents for Public Body Applicants § 1780.95 Public bidding on bonds. Bonds...
31 CFR 356.14 - What are the requirements for submitting bids for customers?
Code of Federal Regulations, 2010 CFR
2010-07-01
... submitting bids for customers? 356.14 Section 356.14 Money and Finance: Treasury Regulations Relating to... requirements for submitting bids for customers? (a) Institutions that may submit bids for customers. Only depository institutions or dealers may submit bids for customers (see definitions at § 356.2), or for...
Bidding Agents That Perpetrate Auction Fraud
NASA Astrophysics Data System (ADS)
Trevathan, Jarrod; McCabe, Alan; Read, Wayne
This paper presents a software bidding agent that inserts fake bids on the seller's behalf to inflate an auction's price. This behaviour is referred to as shill bidding. Shill bidding is strictly prohibited by online auctioneers, as it defrauds unsuspecting buyers by forcing them to pay more for the item. The malicious bidding agent was constructed to aid in developing shill detection techniques. We have previously documented a simple shill bidding agent that incrementally increases the auction price until it reaches the desired profit target, or it becomes too risky to continue bidding. This paper presents an adaptive shill bidding agent which when used over a series of auctions with substitutable items, can revise its strategy based on bidding behaviour in past auctions. The adaptive agent applies a novel prediction technique referred to as the Extremum Consistency (EC) algorithm, to determine the optimal price to aspire for. The EC algorithm has successfully been used in handwritten signature verification for determining the maximum and minimum values in an input stream. The agent's ability to inflate the price has been tested in a simulated marketplace and experimental results are presented.
Competitive Bidding in a Certain Class of Auctions
NASA Astrophysics Data System (ADS)
Johansson, Mathias
2006-11-01
We consider the problem of determining the amount to bid in a certain type of auctions in which customers submit one sealed bid. The bid reflects the price a customer is willing to pay for one unit of the offered goods. The auction is repeated and at each auction each customer requests a certain amount of goods, an amount that we call the capacity of the customer and that varies among customers and over time. At each auction, only the customer with the largest bid-capacity product obtains any goods. The price paid by the winner equals his/her bid-capacity product, and the amount of goods obtained in return equals the winner's capacity. The auction is repeated many times, with only limited information concerning winning bid-capacity products being announced to the customers. This situation is motivated in for example wireless communication networks in which a possible way of obtaining a desired service level is to use dynamic pricing and competitive bidding. In this application, the capacity is typically uncertain when the bid is made. We derive bidding rules and loss functions for a few typical service requirements.
An analysis of competitive bidding by providers for indigent medical care contracts.
Kirkman-Liff, B L; Christianson, J B; Hillman, D G
1985-01-01
This article develops a model of behavior in bidding for indigent medical care contracts in which bidders set bid prices to maximize their expected utility, conditional on estimates of variables which affect the payoff associated with winning or losing a contract. The hypotheses generated by this model are tested empirically using data from the first round of bidding in the Arizona indigent health care experiment. The behavior of bidding organizations in Arizona is found to be consistent in most respects with the predictions of the model. Bid prices appear to have been influenced by estimated costs and by expectations concerning the potential loss from not securing a contract, the initial wealth of the bidding organization, and the expected number of competitors in the bidding process. PMID:4086301
2014-01-01
Background BID functions as a bridge molecule between death-receptor and mitochondrial related apoptotic pathways to amplify apoptotic signaling. Our previous studies have demonstrated a substantial increase in BID expression in primary normal thyroid epithelia cells treated with inflammatory cytokines, including the combination of IFNγ and IL-1β or IFNγ and TNFα. The aim of this study was to determine whether an increase in BID expression in thyroid can induce autoimmune thyroiditis. Methods A transgenic mouse line that expresses human BID in thyroid cells was established by fusing a mouse thyroglobulin (Tg) promoter upstream of human BID (Tg-BID). We tested whether the increased expression of pro-apoptotic BID in thyroid would induce autoimmune thyroiditis, both in the presence and absence of 0.3% iodine water. Results Our data show that Tg-BID mice in a CBA/J (H-2 k) background do not spontaneously develop autoimmune thyroiditis for over a year. However, upon ingestion of iodine in the drinking water, autoimmune thyroiditis does develop in Tg-BID transgenic mice, as shown by a significant increase in anti-Tg antibody and mononuclear cell infiltration in the thyroid glands in 30% of mice tested. Serum T4 levels, however, were similar between iodine-treated Tg-BID transgenic mice and the wild type mice. Conclusions Our data demonstrate that increased thyroid expression of BID facilitates the development of autoimmune thyroiditis induced by iodine uptake. However, the overexpression of BID itself is not sufficient to initiate thyroiditis in CBA/J (H-2 k) mice. PMID:24957380
Rousu, Matthew C.; Thrasher, James F.
2014-01-01
Experimental and observational research often involves asking consumers to self-report the impact of some proposed option. Because self-reported responses involve no consequence to the respondent for falsely revealing how he or she feels about an issue, self-reports may be subject to social desirability and other influences that bias responses in important ways. In this article, we analyzed data from an experiment on the impact of cigarette packaging and pack warnings, comparing smokers’ self-reported impact (four-item scale) and the bids they placed in experimental auctions to estimate differences in demand. The results were consistent across methods; however, the estimated effect size associated with different warning labels was two times greater for the four-item self-reported response scale when compared to the change in demand as indicated by auction bids. Our study provides evidence that self-reported psychosocial responses provide a valid proxy for behavioral change as reflected by experimental auction bidding behavior. More research is needed to better understand the advantages and disadvantages of behavioral economic methods and traditional self-report approaches to evaluating health behavior change interventions. PMID:24399267
The mean, the median, and the St. Petersburg paradox
Hayden, Benjamin Y.; Platt, Michael L.
2013-01-01
The St. Petersburg Paradox is a famous economic and philosophical puzzle that has generated numerous conflicting explanations. To shed empirical light on this phenomenon, we examined subjects’ bids for one St. Petersburg gamble with a real monetary payment. We found that bids were typically lower than twice the smallest payoff, and thus much lower than is generally supposed. We also examined bids offered for several hypothetical variants of the St. Petersburg Paradox. We found that bids were weakly affected by truncating the gamble, were strongly affected by repeats of the gamble, and depended linearly on the initial “seed” value of the gamble. One explanation, which we call the median heuristic, strongly predicts these data. Subjects following this strategy evaluate a gamble as if they were taking the median rather than the mean of the payoff distribution. Finally, we argue that the distribution of outcomes embodied in the St. Petersburg paradox is so divergent from the Gaussian form that the statistical mean is a poor estimator of expected value, so that the expected value of the St. Petersburg gamble is undefined. These results suggest that this classic paradox has a straightforward explanation rooted in the use of a statistical heuristic. PMID:24179560
The mean, the median, and the St. Petersburg paradox.
Hayden, Benjamin Y; Platt, Michael L
2009-06-01
The St. Petersburg Paradox is a famous economic and philosophical puzzle that has generated numerous conflicting explanations. To shed empirical light on this phenomenon, we examined subjects' bids for one St. Petersburg gamble with a real monetary payment. We found that bids were typically lower than twice the smallest payoff, and thus much lower than is generally supposed. We also examined bids offered for several hypothetical variants of the St. Petersburg Paradox. We found that bids were weakly affected by truncating the gamble, were strongly affected by repeats of the gamble, and depended linearly on the initial "seed" value of the gamble. One explanation, which we call the median heuristic , strongly predicts these data. Subjects following this strategy evaluate a gamble as if they were taking the median rather than the mean of the payoff distribution. Finally, we argue that the distribution of outcomes embodied in the St. Petersburg paradox is so divergent from the Gaussian form that the statistical mean is a poor estimator of expected value, so that the expected value of the St. Petersburg gamble is undefined. These results suggest that this classic paradox has a straightforward explanation rooted in the use of a statistical heuristic.
Code of Federal Regulations, 2011 CFR
2011-07-01
... system or tract, or may present a conflict that we will have to resolve in the process of bidding system... bidding systems and bidding system components? 260.130 Section 260.130 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OUTER CONTINENTAL...
Auctions to Reinforce Understanding
ERIC Educational Resources Information Center
Flores, Haynet Rivera
2018-01-01
An auction is a process of buying and selling goods or services by offering them up for bid, taking bids, and then selling each good or service to the highest bidder. Participants bid openly against one another; each bid must be higher than the previous bid. In the activity described rather than goods or services, English teachers sell sentences!…
48 CFR 14.401 - Receipt and safeguarding of bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Opening of Bids and Award of Contract 14.401 Receipt and... identification, and then only by an official designated for this purpose. If a sealed bid is opened by mistake (e.g., because it is not marked as being a bid), the envelope shall be signed by the opener, whose...
30 CFR 260.111 - What conditions apply to the bidding systems that MMS uses?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What conditions apply to the bidding systems... INTERIOR OFFSHORE OUTER CONTINENTAL SHELF OIL AND GAS LEASING Bidding Systems General Provisions § 260.111 What conditions apply to the bidding systems that MMS uses? (a) For each of the bidding systems in...
Contracts for dispatchable power
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kahn, E.P.; Stoft, S.; Marnay, C.
1990-10-01
Competitive bidding for electric power is maturing. Increasing numbers of utilities are soliciting proposals from private suppliers. The amount of capacity being sought is increasing, and potential suppliers appear to be abundant. Analysis of these developments still remains limited. Evidence on the behavior of this market is scarce and sketchy. The underlying economic principles that are shaping the market have not clearly been articulated. In this report we examine the economics of competitive bidding both empirically and analytically. Previous study of this market has focused on the evaluation criteria specified in Requests for Proposals (RFPs), and highly aggregated summary statisticsmore » on participation and results. We continue the examination of RFPs, but also survey the details of long term contracts that have emerged from competitive bidding. Contracts provide a new level of specific detail that has not been previously available. 68 refs., 13 figs., 25 tabs.« less
MEG-BIDS, the brain imaging data structure extended to magnetoencephalography
Niso, Guiomar; Gorgolewski, Krzysztof J.; Bock, Elizabeth; Brooks, Teon L.; Flandin, Guillaume; Gramfort, Alexandre; Henson, Richard N.; Jas, Mainak; Litvak, Vladimir; T. Moreau, Jeremy; Oostenveld, Robert; Schoffelen, Jan-Mathijs; Tadel, Francois; Wexler, Joseph; Baillet, Sylvain
2018-01-01
We present a significant extension of the Brain Imaging Data Structure (BIDS) to support the specific aspects of magnetoencephalography (MEG) data. MEG measures brain activity with millisecond temporal resolution and unique source imaging capabilities. So far, BIDS was a solution to organise magnetic resonance imaging (MRI) data. The nature and acquisition parameters of MRI and MEG data are strongly dissimilar. Although there is no standard data format for MEG, we propose MEG-BIDS as a principled solution to store, organise, process and share the multidimensional data volumes produced by the modality. The standard also includes well-defined metadata, to facilitate future data harmonisation and sharing efforts. This responds to unmet needs from the multimodal neuroimaging community and paves the way to further integration of other techniques in electrophysiology. MEG-BIDS builds on MRI-BIDS, extending BIDS to a multimodal data structure. We feature several data-analytics software that have adopted MEG-BIDS, and a diverse sample of open MEG-BIDS data resources available to everyone. PMID:29917016
MEG-BIDS, the brain imaging data structure extended to magnetoencephalography.
Niso, Guiomar; Gorgolewski, Krzysztof J; Bock, Elizabeth; Brooks, Teon L; Flandin, Guillaume; Gramfort, Alexandre; Henson, Richard N; Jas, Mainak; Litvak, Vladimir; T Moreau, Jeremy; Oostenveld, Robert; Schoffelen, Jan-Mathijs; Tadel, Francois; Wexler, Joseph; Baillet, Sylvain
2018-06-19
We present a significant extension of the Brain Imaging Data Structure (BIDS) to support the specific aspects of magnetoencephalography (MEG) data. MEG measures brain activity with millisecond temporal resolution and unique source imaging capabilities. So far, BIDS was a solution to organise magnetic resonance imaging (MRI) data. The nature and acquisition parameters of MRI and MEG data are strongly dissimilar. Although there is no standard data format for MEG, we propose MEG-BIDS as a principled solution to store, organise, process and share the multidimensional data volumes produced by the modality. The standard also includes well-defined metadata, to facilitate future data harmonisation and sharing efforts. This responds to unmet needs from the multimodal neuroimaging community and paves the way to further integration of other techniques in electrophysiology. MEG-BIDS builds on MRI-BIDS, extending BIDS to a multimodal data structure. We feature several data-analytics software that have adopted MEG-BIDS, and a diverse sample of open MEG-BIDS data resources available to everyone.
47 CFR 25.403 - Bidding application and certification procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CARRIER SERVICES SATELLITE COMMUNICATIONS Competitive Bidding Procedures for DARS § 25.403 Bidding...'s name; (b) Mailing Address (no Post Office boxes); (c) City; (d) State; (e) ZIP Code; (f) Auction...
47 CFR 25.403 - Bidding application and certification procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... CARRIER SERVICES SATELLITE COMMUNICATIONS Competitive Bidding Procedures for DARS § 25.403 Bidding...'s name; (b) Mailing Address (no Post Office boxes); (c) City; (d) State; (e) ZIP Code; (f) Auction...
Research on bidding quotation game of international project
NASA Astrophysics Data System (ADS)
Lin, Tao; Xu, Xin
2017-04-01
Bidding competition of international projects is more and more fierce currently. However, China started late relatively in the field, it is still lack of experience in the aspect of participation in bidding of international projects, and more effective bidding quotation system is not formed till present. Therefore, China can not win through systemic bidding quotation methods compared with many powerful bidding enterprises in the international field. Research on the field is also focused by many aspects as a result. It is urgent to solve related problems. Game theory is combined for analyzing the effectiveness and operability of bidding quotation models mainly based on current situation of bidding market in China international projects during research process in the paper. The research starts with the perspective of bidders for analyzing their game with tenderers and other bidders. The results have operational value aiming at bidders.
48 CFR 514.270-3 - Evaluation factors for award.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Evaluation factors for award. 514.270-3 Section 514.270-3 Federal Acquisition Regulations System GENERAL SERVICES... factors for award. The solicitation should clearly state the basis for evaluating bids for aggregate award...
Hermida, Ramón C; Ríos, María T; Crespo, Juan J; Moyá, Ana; Domínguez-Sardiña, Manuel; Otero, Alfonso; Sánchez, Juan J; Mojón, Artemio; Fernández, José R; Ayala, Diana E
2013-03-01
Patients with resistant hypertension (RH) are at greater risk for stroke, renal insufficiency, and cardiovascular disease (CVD) events than are those for whom blood pressure (BP) is responsive to and well controlled by therapeutic interventions. Although all chronotherapy trials have compared the effects on BP regulation of full daily doses of medications when ingested in the morning versus at bedtime, prescription of the same medications in divided doses twice daily (BID) is frequent. Here, we investigated the influence of hypertension treatment-time regimen on the circadian BP pattern, degree of BP control, and relevant clinical and laboratory medicine parameters of RH patients evaluated by 48-h ambulatory BP monitoring (ABPM). This cross-sectional study evaluated 2899 such patients (1701 men/1198 women), 64.2 ± 11.8 (mean ± SD) yrs of age, enrolled in the Hygia Project. Among the participants, 1084 were ingesting all hypertension medications upon awakening (upon-awakening regimen), 1436 patients were ingesting the full daily dose of ≥1 of them at bedtime (bedtime regimen), and 379 were ingesting split doses of ≥1 medications BID upon awakening and at bedtime (BID regimen). Patients of the bedtime regimen compared with the other two treatment-time regimens had lower likelihood of microalbuminuria and chronic kidney disease; significantly lower albumin/creatinine ratio, glucose, total cholesterol, and low-density lipoprotein (LDL) cholesterol; plus higher estimated glomerular filtration rate and high-density lipoprotein (HDL) cholesterol. The bedtime regimen was also significantly associated with lower asleep systolic (SBP) and diastolic (DBP) BP means than the upon-awakening and BID regimens. The sleep-time relative SBP and DBP decline was significantly attenuated by the upon-awakening and BID regimens (p < .001), resulting in significantly higher prevalence of non-dipping in these two treatment-time regimen groups (80.5% and 77.3%, respectively) than in the bedtime regimen (54.4%; p < .001 between groups). Additionally, the prevalence of the riser BP pattern, associated with highest CVD risk, was much greater, 31.0% and 29.8%, respectively, among patients of the upon-awakening and BID-treatment regimens, compared with the bedtime regimen (17.6%; p < .001 between groups). Patients of the bedtime regimen also showed significantly higher prevalence of properly controlled ambulatory BP (p < .001) as a result of a greater proportion of them showing complete control of asleep SBP and DBP means. Our findings demonstrate significantly lower asleep SBP and DBP means and attenuated prevalence of blunted nighttime BP decline, i.e., lower prevalence of CVD risk markers, in RH patients ingesting the full daily dose of ≥1 hypertension medications at bedtime than in those ingesting all of them upon awakening or ≥1 of them as split doses BID. In RH, ingesting the same medications BID neither improves ambulatory BP control nor reduces the prevalence of non-dipping, and cannot be considered chronotherapy. Collectively, findings of this study indicate that a bedtime hypertension medication regimen, in conjunction with proper patient evaluation by ABPM to corroborate the diagnosis of true RH and avoid treatment-induced nocturnal hypotension, should be the therapeutic scheme of choice for patients who, by conventional cuff methods (and in the absence of ABPM) and the morning-treatment regimen, have been mistakenly judged to be resistant to therapy.
NASA Astrophysics Data System (ADS)
Tseng, Paoshan; Wang, Hanhsiang; Chen, Pingfu; Yeh, Lihsu
2018-01-01
Commonly seen tender bid price information of the public works in Taiwan are the budget amount, floor price, awarding price and so on. The ratio of the awarding price to the floor price or budget price is the so-called bidding price ratio. This ratio is influenced by multifaceted factor interactions and is significant to decision making management in engineering projects. Low bidding price ratio may imply that the budget allocation by the tendering agency is inconsiderate or due to the improper market competition of low price bid rigging. High bidding price ratio in turn may indicate that the allocated budget is relatively low, bidder risks in increased contract execution uncertainty or even exclusive bidding scenario. Therefore, the correlation between the bidding price ratio and the aforementioned tender award information is the key issue of this study. This study gathered the tender information of the civil engineering projects in Taiwan within the past seven years. By performing statistical analysis and clustering the gathered data by bidding price ratio, this study investigated the influencing factors and regulations of bidding price ratio using data mining approach.
46 CFR Sec. 2 - Description of NSA-WORKSMALREP Contract.
Code of Federal Regulations, 2010 CFR
2010-10-01
... competitive bids, spot bids, or by negotiation for the performance of ship repair work. NSA Order No. 46 (SRM... bids, spot bids or negotiation, therefore, further reference thereto will not be made herein. ...
Developing Medicare Competitive Bidding: A Study of Clinical Laboratories
Hoerger, Thomas J.; Meadow, Ann
1997-01-01
Competitive bidding to derive Medicare fees promises several advantages over administered fee systems. The authors show how incentives for cost savings, quality, and access can be incorporated into bidding schemes, and they report on a study of the clinical laboratory industry conducted in preparation for a bidding demonstration. The laboratory industry is marked by variable concentration across geographic markets and, among firms themselves, by social and economic heterogeneity. The authors conclude that these conditions can be accommodated by available bidding design options and by careful selection of bidding markets. PMID:10180003
Yoshikawa, M; Yoshinaga, K; Imamura, Y; Hayashi, T; Osako, T; Takahashi, K; Kaneko, M; Fujisawa, M; Kamidono, S
2016-09-01
The organ donation rate in Japan is much lower than that in other developed countries for several reasons. An advanced educational program for in-hospital procurement coordinators is a possible solution for this. We introduced a Transplant Procurement Management (TPM) educational program at Hyogo Prefecture, Japan. Ten healthcare professionals at Hyogo Prefecture participated in the Advanced International TPM course to educate themselves on TPM and held 2 TPM Model Organ Procurement Training Workshops at Hyogo Prefecture for in-hospital procurement coordinators. Furthermore, we held 2 workshops outside Hyogo Prefecture and at the same time undertook a pre-workshop questionnaire survey to evaluate the ability and motivation with respect to organ donation. To evaluate the effectiveness of the workshops, we conducted post-workshop and 3-months-after workshop questionnaire surveys. The results of the pre-workshop survey revealed that in-hospital procurement coordinators lacked the knowledge regarding the entire organ donation process, the current status of organ donation in Japan, and the definition of brain death. Moreover, they did not completely understand the meaning of "organ donation." The results of the post-workshop questionnaire survey showed that the educational program was effective to improve the knowledge and skills of organ donation and motivated behavioral changes among the participants. The survey results showed that our TPM model educational program offered sufficient knowledge and skills to increase organ donation at Hyogo Prefecture. We will continue this program and make an effort to further contribute to the Japanese organ donation activities. Copyright © 2016 Elsevier Inc. All rights reserved.
New capacity bidding in Hungary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bakacs, I.
The paper gives a description of the regulatory and legal fundamentals of the new capacity bidding launched in 1997 in Hungary by MVM Rt, the transmission system operator. Some details of the regulations relevant to new generating capacity licensing are discussed with regard to the implementation of the new formal competitive bidding for the right to establish new or retrofitted (repowered) generating capacity. The paper presents the major tender rules and conditions. The bidding has attracted considerable interest. Because of the confidentiality of information no details are given on individual Bidders or bids, only some general statistical information is available.more » Due to the unexpectedly large interest and number of bids in the first stage of the bidding closed in January 1998 and some other events MVM has to change slightly some of the tender rules for the second stage announced in February. Final bids should be submitted by September 1998.« less
Liarozole (R75251) in hormone-resistant prostate cancer patients.
Dijkman, G A; Fernandez del Moral, P; Bruynseels, J; de Porre, P; Denis, L; Debruyne, F M
1997-09-15
Liarozole is an imidazole derivative that has been identified as an inhibitor of the cytochrome P450-dependent all-trans retinoid acid (RA) breakdown. RA is one of the principal endogenous compounds that controls growth and differentiation of epithelial tissues in mammals. Fifty-five patients with hormone-resistant prostate cancer in progression, following at least first-line androgen ablation therapy, were evaluated. Thirty-one patients were treated with liarozole 300 mg b.i.d., while 24 patients started with 150 mg b.i.d., which was increased to 300 mg b.i.d. after 4 or 8 weeks. Two patients were not evaluable because they withdrew after initial consent. The WHO performance status was 0 (n = 18), 1 (n = 22), 2 (n = 17), and 3 (n = 6). Most patients (80%) used analgesics. For 11 out of the 53 patients, treatment lasted less than 1 month (they were therefore not evaluable for response) due to: poor compliance (n = 1); early death (n = 3); side-effects (n = 2); and decline of physical condition and continuous progression (n = 4). One patient refused to report for follow-up. In all responders, except one, the dose was increased to 300 mg b.i.d. In 23 of the 42 patients evaluable for response, the pain score improved. In 5 patients the pain score had reduced from 2 or 3 to 0. In 11 out of the 42 patients there was a 1-point improvement of WHO performance status. The prostatic-specific antigen (PSA) response rate was 41%; 15 out of 42 evaluable patients presented a decrease of > or = 50%, whereas PSA normalized in 2 further patients. Most of the side effects mimicked retinoid acid toxicity: cutaneous manifestations (such as dry skin, dry lips, sticky skin, brittle nails, erythema, or itch). All patients experienced one or more of these side effects. Other side effects include nausea, fatigue, and slight alopecia. Liarozole can be an enrichment of the therapeutic armamentarium for treatment of hormone-resistant prostate cancer patients after first-line androgen ablation therapy without serious toxicity.
48 CFR 2901.603-72 - Administrative procurement management reviews.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Authority, and Responsibilities 2901.603-72 Administrative procurement management reviews. (a) The Senior..., policies, procedures and applicable directives. The reviews are to emphasize the development and... quality reviews and assessment techniques. This system is required to: (1) Evaluate the effectiveness and...
Competitive bidding in Medicare: who benefits from competition?
Song, Zirui; Landrum, Mary Beth; Chernew, Michael E
2012-09-01
To conduct the first empirical study of competitive bidding in Medicare. We analyzed 2006-2010 Medicare Advantage data from the Centers for Medicare and Medicaid Services using longitudinal models adjusted for market and plan characteristics. A $1 increase in Medicare's payment to health maintenance organization (HMO) plans led to a $0.49 (P <.001) increase in plan bids, with $0.34 (P <.001) going to beneficiaries in the form of extra benefits or lower cost sharing. With preferred provider organization and private fee-for-service plans included, higher Medicare payments increased bids less ($0.33 per dollar), suggesting more competition among these latter plans. As a market-based alternative to cost control through administrative pricing, competitive bidding relies on private insurance plans proposing prices they are willing to accept for insuring a beneficiary. However, competition is imperfect in the Medicare bidding market. As much as half of every dollar in increased plan payment went to higher bids rather than to beneficiaries. While having more insurers in a market lowered bids, the design of any bidding system for Medicare should recognize this shortcoming of competition.
48 CFR 6.401 - Sealed bidding and competitive proposals.
Code of Federal Regulations, 2010 CFR
2010-10-01
... competitive proposals. 6.401 Section 6.401 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING COMPETITION REQUIREMENTS Sealed Bidding and Competitive Proposals 6.401 Sealed bidding and competitive proposals. Sealed bidding and competitive proposals, as described in Parts...
48 CFR 6.401 - Sealed bidding and competitive proposals.
Code of Federal Regulations, 2011 CFR
2011-10-01
... competitive proposals. 6.401 Section 6.401 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING COMPETITION REQUIREMENTS Sealed Bidding and Competitive Proposals 6.401 Sealed bidding and competitive proposals. Sealed bidding and competitive proposals, as described in Parts...
47 CFR 1.2103 - Competitive bidding design options.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Competitive bidding design options. 1.2103 Section 1.2103 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Competitive Bidding Proceedings General Procedures § 1.2103 Competitive bidding design options. (a) The...
47 CFR 54.603 - Competitive bid requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 3 2011-10-01 2011-10-01 false Competitive bid requirements. 54.603 Section 54...) UNIVERSAL SERVICE Universal Service Support for Health Care Providers § 54.603 Competitive bid requirements. (a) Competitive bidding requirement. To select the telecommunications carriers that will provide...
The BCL-2 family protein Bid is critical for pro-inflammatory signaling in astrocytes.
König, Hans-Georg; Coughlan, Karen S; Kinsella, Sinéad; Breen, Bridget A; Prehn, Jochen H M
2014-10-01
Amyotrophic lateral sclerosis (ALS) is a fatal neurodegenerative disease characterized by the loss of motoneurons in the spinal cord, brainstem and motor cortex. Mutations in the superoxide dismutase 1 (SOD1) gene represent a frequent genetic determinant and recapitulate a disease phenotype similar to ALS when expressed in mice. Previous studies using SOD1(G93A) transgenic mice have suggested a paracrine mechanism of neuronal loss, in which cytokines and other toxic factors released from astroglia or microglia trigger motoneuron degeneration. Several pro-inflammatory cytokines activate death receptors and may downstream from this activate the Bcl-2 family protein, Bid. We here sought to investigate the role of Bid in astrocyte activation and non-cell autonomous motoneuron degeneration. We found that spinal cord Bid protein levels increased significantly during disease progression in SOD1(G93A) mice. Subsequent experiments in vitro indicated that Bid was expressed at relatively low levels in motoneurons, but was enriched in astrocytes and microglia. Bid was strongly induced in astrocytes in response to pro-inflammatory cytokines or exposure to lipopolysaccharide. Experiments in bid-deficient astrocytes or astrocytes treated with a small molecule Bid inhibitor demonstrated that Bid was required for the efficient activation of transcription factor nuclear factor-κB in response to these pro-inflammatory stimuli. Finally, we found that conditioned medium from wild-type astrocytes, but not from bid-deficient astrocytes, was toxic when applied to primary motoneuron cultures. Collectively, our data demonstrate a new role for the Bcl-2 family protein Bid as a mediator of astrocyte activation during neuroinflammation, and suggest that Bid activation may contribute to non-cell autonomous motoneuron degeneration in ALS. Copyright © 2014 Elsevier Inc. All rights reserved.
Ewen, Margaret; Al Sakit, Maisa; Saadeh, Rawan; Laing, Richard; Vialle-Valentin, Catherine; Seita, Akihiro; Bunders, Joske
2014-01-01
The United Nations Relief and Works Agency for Palestine Refugees in the Near East (UNRWA), the main primary healthcare provider for 4.9 million Palestinian refugees, spent USD18.3 million on essential medicines dispensed free-of-charge through clinics in five areas of operation ('fields'): Gaza, Jordan, Lebanon, Syria, and the West Bank (2010). Faced with budget contraints and an increasing demand for medicines to treat chronic conditions, the objective of our study was to assess UNRWA's medicine procurement prices to see if savings could be possible. In July 2011, data was collected from UNRWA headquarters in Jordan. Price analyses focused on the top 80 medicines by value, accounting for 93% of pharmaceutical expenditure from the General Fund, with comparisons to international, regional and national references. Prices were also compared for the few medicines procured both through UNRWA's central tender (centrally) and by the fields directly (locally). Central procurement prices did not differ markedly from reference prices: median ratios of UNRWA prices to Management Sciences for Health's International Drug Price Indicator Guide, Jordan's Joint Procurement Department, Gulf Cooperation Council, and IDA Foundation bulk packs were 0.99, 1.00, 0.98 and 1.12 respectively. Applying the lowest comparator price to five comparatively higher priced medicines would yield savings of USD1.4 million. Local procurements were generally less cost-effective than central tender procurement, with notable differences across fields and medicines. Overall, UNRWA's procurement prices were competitive despite the relatively small quantities procured. Regular monitoring of procurement prices and quantities is needed in order to make informed decisions. Our evaluation also underscores the heavy burden of antidiabetic medicines and antimicrobials on UNRWA procurement expenditure.
Taieb, Alain; Stein Gold, Linda; Feldman, Steven R; Dansk, Viktor; Bertranou, Evelina
2016-06-01
Papulopustular rosacea is a chronic skin disease involving central facial erythema in combination with papules and pustules. Papulopustular rosacea is treated with topical, systemic, or a combination of topical and systemic therapies. Currently approved topical therapies include azelaic acid gel/cream/foam twice daily (BID) and metronidazole cream/gel/lotion BID. Ivermectin 1% cream once daily (QD) is a new topical agent for the treatment of papulopustular rosacea that has been approved for the management of inflammatory lesions of rosacea and offers an alternative to current treatments. To evaluate the cost-effectiveness of ivermectin 1% cream QD compared with current topical treatments in order to understand the cost of adding ivermectin as a treatment option that would bring additional clinical benefit for adults with papulopustular rosacea in the United States. The cost-effectiveness of ivermectin 1% cream QD was compared with metronidazole 0.75% cream BID and azelaic acid 15% gel BID for adults in the United States with moderate-to-severe papulopustular rosacea using a Markov cohort state transition structure with 2 mutually exclusive health states (rosacea and no rosacea) and 5 phases. Patients could succeed or fail to respond to treatment and experience a relapse after treatment success. The model took a health care payer perspective (direct medical costs of topical and/or systemic therapy plus health care costs for physician and specialist visits) and used a 3-year time horizon. The model was run for a cohort of 1,000 patients. Costs (2014 U.S. dollars) and benefits (disease-free days and quality-adjusted life-years [QALYs]) were discounted at a rate of 3% per annum. Cost-effectiveness was determined by the incremental cost-effectiveness ratio (ICER) and measured in terms of incremental cost per QALY gained (estimated from health state utilities for patients with and without rosacea). Univariate and probabilistic sensitivity analyses (PSA) were conducted to assess the robustness of model outcomes. Compared with metronidazole 0.75% cream BID, ivermectin 1% cream QD was associated with higher costs but provided greater clinical benefit, with an ICER of $13,211 per QALY gained. For a cohort of 1,000 patients, ivermectin 1% cream QD provided an additional 72,922 disease-free days (200 years) over a 3-year period compared with metronidazole 0.75% cream BID, leading to a lower cost per disease-free day for ivermectin 1% cream QD ($4.54) compared with metronidazole 0.75% cream BID ($4.85). Ivermectin 1% cream QD was associated with lower total costs and greater clinical benefit compared with azelaic acid 15% gel BID at year 3 and dominated this treatment. After 3 years, ivermectin 1% cream QD was associated with the lowest health care costs ($62,767 compared with $73,284 for metronidazole 0.75% cream BID and $77,208 for azelaic acid 15% gel BID), reflecting a 15% reduction in physician visit costs, when compared with metronidazole 0.75% cream BID, and almost a 20% reduction, when compared with azelaic acid 15% gel BID. The univariate sensitivity analyses indicated that the results are sensitive to the time horizon selected: the longer the time horizon, the more beneficial the results for ivermectin 1% cream QD relative to the comparators, although even at 1 year, ivermectin 1% cream QD dominated azelaic acid 15% gel BID. The PSA suggested that ivermectin 1% cream QD was the most likely treatment to be cost-effective at a willingness-to-pay threshold of $15,000 and above. Ivermectin 1% cream QD had favorable incremental cost-effectiveness when compared with metronidazole 0.75% cream BID and dominated azelaic acid 15% gel BID in the treatment of papulopustular rosacea in the United States. Therefore, ivermectin 1% cream QD may be a good first-line treatment for papulopustular rosacea, providing additional clinical benefit at no or low additional cost. This study was sponsored by Galderma Laboratories. The sponsor was involved in the design of the model structure but not in the collection of the data used to populate the m
Healthy food procurement policies and their impact.
Niebylski, Mark L; Lu, Tammy; Campbell, Norm R C; Arcand, Joanne; Schermel, Alyssa; Hua, Diane; Yeates, Karen E; Tobe, Sheldon W; Twohig, Patrick A; L'Abbé, Mary R; Liu, Peter P
2014-03-03
Unhealthy eating is the leading risk for death and disability globally. As a result, the World Health Organization (WHO) has called for population health interventions. One of the proposed interventions is to ensure healthy foods are available by implementing healthy food procurement policies. The objective of this systematic review was to evaluate the evidence base assessing the impact of such policies. A comprehensive review was conducted by searching PubMed and Medline for policies that had been implemented and evaluated the impact of food purchases, food consumption, and behaviors towards healthy foods. Thirty-four studies were identified and found to be effective at increasing the availability and purchases of healthy food and decreasing purchases of unhealthy food. Most policies also had other components such as education, price reductions, and health interventions. The multiple gaps in research identified by this review suggest that additional research and ongoing evaluation of food procurement programs is required. Implementation of healthy food procurement policies in schools, worksites, hospitals, care homes, correctional facilities, government institutions, and remote communities increase markers of healthy eating. Prior or simultaneous implementation of ancillary education about healthy eating, and rationale for the policy may be critical success factors and additional research is needed.
Healthy Food Procurement Policies and Their Impact
Niebylski, Mark L.; Lu, Tammy; Campbell, Norm R. C.; Arcand, Joanne; Schermel, Alyssa; Hua, Diane; Yeates, Karen E.; Tobe, Sheldon W.; Twohig, Patrick A.; L’Abbé, Mary R.; Liu, Peter P.
2014-01-01
Unhealthy eating is the leading risk for death and disability globally. As a result, the World Health Organization (WHO) has called for population health interventions. One of the proposed interventions is to ensure healthy foods are available by implementing healthy food procurement policies. The objective of this systematic review was to evaluate the evidence base assessing the impact of such policies. A comprehensive review was conducted by searching PubMed and Medline for policies that had been implemented and evaluated the impact of food purchases, food consumption, and behaviors towards healthy foods. Thirty-four studies were identified and found to be effective at increasing the availability and purchases of healthy food and decreasing purchases of unhealthy food. Most policies also had other components such as education, price reductions, and health interventions. The multiple gaps in research identified by this review suggest that additional research and ongoing evaluation of food procurement programs is required. Implementation of healthy food procurement policies in schools, worksites, hospitals, care homes, correctional facilities, government institutions, and remote communities increase markers of healthy eating. Prior or simultaneous implementation of ancillary education about healthy eating, and rationale for the policy may be critical success factors and additional research is needed. PMID:24595213
42 CFR 422.254 - Submission of bids.
Code of Federal Regulations, 2011 CFR
2011-10-01
... part or may choose not to renew the contract. (4) Substantial differences between bids. An MA organization's bid submissions must reflect differences in benefit packages or plan costs that CMS determines to represent substantial differences relative to a sponsor's other bid submissions. (5) CMS may...
42 CFR 422.254 - Submission of bids.
Code of Federal Regulations, 2012 CFR
2012-10-01
... this part or may choose not to renew the contract. (4) Substantial differences between bids. An MA organization's bid submissions must reflect differences in benefit packages or plan costs that CMS determines to represent substantial differences relative to a sponsor's other bid submissions. (5) CMS may...
42 CFR 422.254 - Submission of bids.
Code of Federal Regulations, 2013 CFR
2013-10-01
... this part or may choose not to renew the contract. (4) Substantial differences between bids. An MA organization's bid submissions must reflect differences in benefit packages or plan costs that CMS determines to represent substantial differences relative to a sponsor's other bid submissions. (5) CMS may...
48 CFR 2014.201 - Preparation of invitation for bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Preparation of invitation for bids. 2014.201 Section 2014.201 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 2014.201 Preparation of...
Elger, Christian; Bialer, Meir; Falcão, Amílcar; Vaz-da-Silva, Manuel; Nunes, Teresa; Almeida, Luís; Soares-da-Silva, Patrício
2013-08-01
Investigate the pharmacokinetics of once-daily (QD; 900 mg) and twice-daily (BID; 450 mg) regimens of eslicarbazepine acetate (ESL) and BID (450 mg) regimen of oxcarbazepine (OXC) at steady state in healthy volunteers. Single-center, open-label, randomized, three-way (n = 12) crossover studies in healthy volunteers. Mean eslicarbazepine Cmax,ss (in μm) following ESL QD (87.3) was 33.3% higher (p < 0.05) compared to ESL BID (65.5) and 82.1% higher (p < 0.05) compared to OXC BID (48.0). The mean area under the curve (AUC)ss,0-τ (in μmol h/L) following the last dose of an 8-day repeated dosing was 1156.3, 1117.6, and 968.4 for ESL QD, ESL BID, and OXC BID, respectively. The ratio eslicarbazepine plasma exposure (μmol h/L) to ESL daily-dose (μmol) was 0.381 (1156.3:3037.3), 0.368 (1117.6:3037.3), and 0.271 (968.4:3567.6) for ESL-QD, ESL-BID, and OXC-BID, respectively, which translates into a 40.6% increase in the ability of ESL-QD compared to OXC-BID to deliver into the plasma their major active entity eslicarbazepine. The extent of plasma exposure to ESL minor metabolites: (R)-licarbazepine and oxcarbazepine after ESL-QD was 71.5% and 61.1% lower, respectively, than after OXC-BID. Twenty, 24 and 38 treatment emergent adverse events were reported with ESL-QD, ESL-BID, and OXC-BID, respectively. ESL-QD resulted in 33.3% higher peak plasma concentration (Cmax,ss ) of eslicarbazepine and similar extent of plasma exposure (AUCss,0-τ ) when compared to ESL-BID, which may contribute to the efficacy profile reported with once-daily ESL. In comparison to OXC-BID, administration of ESL-QD resulted in 40.6% increase in the delivery of eslicarbazepine into the plasma as well as a significantly lower systemic exposure to (R)-licarbazepine and oxcarbazepine. Wiley Periodicals, Inc. © 2013 International League Against Epilepsy.
Ji, Linong; Li, Ling; Kuang, Jian; Yang, Tao; Kim, Dong-Jun; Kadir, Azidah A; Huang, Chien-Ning; Lee, Douglas
2017-05-01
This study evaluated the efficacy and safety of 26 weeks of twice-daily (BID) alogliptin + metformin fixed-dose combination (FDC) therapy in Asian patients with type 2 diabetes. Patients aged 18 to 75 years with hemoglobin A1c (HbA1c) of 7.5% to 10.0% after ≥2 months of diet and exercise and a 4-week placebo run-in were enrolled. Eligible patients were randomized (1:1:1:1) to placebo, alogliptin 12.5 mg BID, metformin 500 mg BID or alogliptin 12.5 mg plus metformin 500 mg FDC BID. The primary endpoint was change in HbA1c from baseline to end of treatment (Week 26). In total, 647 patients were randomized. The least-squares mean change in HbA1c from baseline to Week 26 was -0.19% with placebo, -0.86% with alogliptin, -1.04% with metformin and -1.53% with alogliptin + metformin FDC. Alogliptin + metformin FDC was significantly more effective ( P < .0001) in lowering HbA1c than either alogliptin or metformin alone. The safety profile of alogliptin + metformin FDC was similar to that of the individual components alogliptin and metformin. The study demonstrated that treatment with alogliptin + metformin FDC BID resulted in better glycaemic control than either monotherapy and was well tolerated in Asian patients with type 2 diabetes. © 2017 The Authors. Diabetes, Obesity and Metabolism published by John Wiley & Sons Ltd.
Ng, Juki; Chwalisz, Kristof; Carter, David C; Klein, Cheri E
2017-05-01
Elagolix is a nonpeptide, oral gonadotropin-releasing hormone (GnRH) antagonist being developed for sex-hormone-dependent diseases in women. We evaluated the pharmacokinetics and pharmacodynamics of elagolix. This study was a randomized, double-blind, placebo-controlled, multiple-ascending dose study in 45 healthy premenopausal women at a research unit. Elagolix [150 mg once daily or 100, 200, 300, or 400 mg twice daily (BID)] or placebo was administered for 21 days. Main outcome measures were elagolix pharmacokinetics, suppression of gonadotropics [follicle-stimulating hormone (FSH), luteinizing hormone (LH)] and ovarian hormones [estradiol (E2), progesterone (P)], and adverse events. Elagolix was rapidly absorbed after oral dosing, reaching maximum concentrations at 1.0 to 1.5 hours, with a half-life of 4 to 6 hours. FSH, LH, and E2 were suppressed within hours of elagolix administration on day 1. Dose-dependent suppression of E2 was observed, with maximum suppression achieved with elagolix 200 mg BID. Dose-dependent suppression of FSH and LH was also observed, with maximal or near-maximal suppression achieved at 300 mg BID and 200 mg BID, respectively. At elagolix doses ≥100 mg BID, P concentrations remained at anovulatory levels throughout 21 days of dosing. The most frequently reported adverse events were headache and hot flush. Elagolix administration allows for modulation of gonadotropin and ovarian hormone concentrations, from partial suppression at lower doses to nearly full suppression at higher doses. The results of this study provide a rationale for elagolix dose selection for treatment of sex hormone-dependent diseases in women. Copyright © 2017 Endocrine Society
75 FR 63695 - Designation of Biobased Items for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-18
... manufacturing in rural communities; and to enhance the Nation's energy security by substituting biobased... items used in products or systems designed or procured for combat or combat-related missions, which will... least part of its environmental information responsibilities. The BEES tool is designed to evaluate...
Competitive Bidding in Medicare: Who Benefits From Competition?
Song, Zirui; Landrum, Mary Beth; Chernew, Michael E.
2012-01-01
Objectives To conduct the first empirical study of competitive bidding in Medicare. Study Design and Methods We analyzed 2006–2010 Medicare Advantage data from the Centers for Medicare & Medicaid Services using longitudinal models adjusted for market and plan characteristics. Results A $1 increase in Medicare's payment to health maintenance organization (HMO) plans led to a $0.49 (P <.001) increase in plan bids, with $0.34 (P <.001) going to beneficiaries in the form of extra benefits or lower cost sharing. With preferred provider organization and private fee-for-service plans included, higher Medicare payments increased bids less ($0.33 per dollar), suggesting more competition among these latter plans. Conclusions As a market-based alternative to cost control through administrative pricing, competitive bidding relies on private insurance plans proposing prices they are willing to accept for insuring a beneficiary. However, competition is imperfect in the Medicare bidding market. As much as half of every dollar in increased plan payment went to higher bids rather than to beneficiaries. While having more insurers in a market lowered bids, the design of any bidding system for Medicare should recognize this shortcoming of competition. PMID:23009305
Bimatoprost 0.03% for the Treatment of Eyebrow Hypotrichosis
Beer, Kenneth; Carruthers, Alastair; Coleman, William P.; Draelos, Zoe Diana; Jones, Derek; Goldman, Mitchel P.; Pucci, Michael L.; VanDenburgh, Amanda; Weng, Emily; Whitcup, Scott M.
2016-01-01
BACKGROUND Eyebrow loss may have substantial negative functional and social consequences. OBJECTIVE Evaluate the safety and efficacy of bimatoprost 0.03% in subjects with eyebrow hypotrichosis. METHODS This multicenter, double-masked study randomized adult females or males with eyebrow hypotrichosis to receive bimatoprost 0.03% twice (BID) or once daily (QD) or vehicle BID for 7 months. Primary endpoint was overall eyebrow fullness at Month 7. Secondary endpoints included eyebrow fullness (mm2), darkness (intensity units), and subject satisfaction with treatment. Safety was also assessed. RESULTS At Month 7, the proportion of subjects with improvement was significantly higher in bimatoprost groups versus vehicle (both, p < .001). Improvements occurred in both bimatoprost groups versus vehicle after Month 1 and continued through follow-up; eyebrow fullness and darkness improved as early as Months 2 and 1, respectively (both, p < .001). Greater satisfaction was reported with bimatoprost versus vehicle at Month 2 and all subsequent time points. Overall, 38.1%, 42.4%, and 35.5% of subjects in the bimatoprost BID, QD, and vehicle groups, respectively, experienced ≥1 treatment-emergent adverse event (TEAE). Most frequent TEAEs were similar across groups. No skin or iris hyperpigmentation or conjunctival hyperemia occurred. CONCLUSION Bimatoprost 0.03% BID and QD is safe, well tolerated, and effective for eyebrow hypotrichosis. PMID:27124878
36 CFR 223.231 - Bidding methods.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Bidding methods. 223.231... methods. The Contracting Officer or designated forest officer shall offer advertised sales of special forest products through sealed bid or sealed bid followed by oral auction. The method selected shall: (a...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Minimum bid. 3923.10 Section 3923.10 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL SHALE LEASING Minimum Bid § 3923.10 Minimum bid...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Minimum bid. 3923.10 Section 3923.10 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL SHALE LEASING Minimum Bid § 3923.10 Minimum bid...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Minimum bid. 3923.10 Section 3923.10 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL SHALE LEASING Minimum Bid § 3923.10 Minimum bid...
48 CFR 814.304 - Submission, modification, and withdrawal of bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Submission, modification, and withdrawal of bids. 814.304 Section 814.304 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Submission of Bids 814.304...
36 CFR 223.51 - Bid monitoring.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Bid monitoring. 223.51 Section 223.51 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND... Bid monitoring. Each Regional Forester shall monitor bidding patterns on timber sales to determine if...
48 CFR 3414.406 - Mistakes in bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Mistakes in bids. 3414.406 Section 3414.406 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Opening of Bids and Award of Contract 3414.406 Mistakes...
Archer, David F; Stewart, Elizabeth A; Jain, Rita I; Feldman, Robert A; Lukes, Andrea S; North, Janine D; Soliman, Ahmed M; Gao, Jingjing; Ng, Juki W; Chwalisz, Kristof
2017-07-01
To evaluate the safety and efficacy of elagolix vs. placebo and elagolix with low-dose E 2 /progestogen add-back therapy. Proof-of-concept, dose-ranging, multiple-cohort study. Clinics. Premenopausal women with fibroids and heavy menstrual bleeding (menstrual blood loss [MBL] >80 mL per cycle). Three months' treatment with elagolix alone: 100 mg twice daily (BID), 200 mg BID, 300 mg BID, 400 mg once daily (QD), or 600 mg QD (all but the 600 mg QD arm were placebo controlled); or elagolix plus add-back therapy: 200 mg BID plus continuous low-dose E 2 0.5 mg/norethindrone acetate 0.1 mg or elagolix 300 mg BID plus E 2 1 mg continuously and cyclical P 200 mg. Least-squares mean percentage change in MBL; adverse events (AEs). Mean age was 41.8 years; 73.8% were black; mean baseline MBL was 267 mL. Of randomized women (elagolix alone, n = 160; placebo, n = 50; elagolix with add-back therapy, n = 61), 228 of 271 completed the 3-month treatment period. The MBL percentage change from baseline to last 28 days was significantly greater with elagolix alone (range, -72% to -98%; dose-dependent reduction was highest with 300 mg BID) vs. placebo (range, -8% to -41%); mean percentage changes with add-back regimens were -80% to -85%. Overall AEs were dose independent (elagolix alone, 70.0%-81.3%) but lower with placebo (56.0%) and add-back regimens (55.6%-70.6%). Hot flush was the most common AE (elagolix alone, 45.5%-62.5%; placebo, 12.0%; add-back regimens, 18.5%-26.5%). Elagolix significantly reduced heavy menstrual bleeding in women with fibroids. Low-dose add-back regimens substantially reduced flushing. NCT01441635. Copyright © 2017 American Society for Reproductive Medicine. Published by Elsevier Inc. All rights reserved.
Adler, Lenard A; Kroon, René A; Stein, Mark; Shahid, Mohammed; Tarazi, Frank I; Szegedi, Armin; Schipper, Jacques; Cazorla, Pilar
2012-12-01
It has been posited that glutamate dysregulation contributes to the pathophysiology of attention-deficit/hyperactivity disorder (ADHD). Modulation of glutamate neurotransmission may provide alternative therapeutic options. The novel 2-amino-3-(5-methyl-3-oxo-1,2-oxazol-4-yl)propanoic acid receptor positive allosteric modulator Org 26576 was investigated with a translational approach including preclinical and clinical testing. Neonatal rat 6-hydroxydopamine lesion-induced hyperactivity was used as preclinical model. Seventy-eight ADHD adults entered a multicenter, double-blind, placebo-controlled, two-period crossover trial. After 1 week placebo lead-in, 67 subjects were randomized into one of four treatment sequences: sequence A (n = 15) Org 26576 (100 mg b.i.d.) for 3 weeks, followed by a 2-week placebo crossover and 3 weeks placebo; sequence B (n = 16) 5 weeks placebo followed by 3 weeks Org 26576 (100 mg b.i.d.); sequence C (n = 18) Org 26576 flexible dose (100-300 mg b.i.d.) for 3 weeks, then 5 weeks placebo; sequence D (n = 18) 5 weeks placebo followed by 3 weeks Org 26576 (100-300 mg b.i.d.). The Adult ADHD Investigator Symptom Rating Scale was used to assess changes in ADHD symptomatology. Org 26576 (1, 3, 10 mg/kg intraperitoneal) produced dose-dependent inhibition of locomotor hyperactivity in 6-hydroxydopamine-lesioned rats. Org 26576 (100 mg b.i.d.) was superior to placebo in treating symptoms of adult ADHD subjects. The primary Adult ADHD Investigator Symptom Rating Scale results were supported by some secondary analyses. However, Org 26576 (100-300 mg b.i.d.) did not confirm these results. Most frequently reported adverse events were nausea, dizziness, and headache. These preclinical and clinical findings suggest that Org 25676 may have utility in the treatment of ADHD. Copyright © 2012 Society of Biological Psychiatry. Published by Elsevier Inc. All rights reserved.
Application of BIM technology in construction bidding
NASA Astrophysics Data System (ADS)
wei, Li
2017-12-01
bidding is a very important step of construction project. For the owners, bidding is the key link of selecting the best construction plan and saving the project cost to the maximum extent. For Construction Corporation, it is the key to show their construction technology which can improve the probability of winning the bid. this paper researches on the application of BIM technology in bidding process of construction project in detail, and discussesthe application of BIM technology in construction field comprehensively.
Pro-apoptotic Bid induces membrane perturbation by inserting selected lysolipids into the bilayer.
Goonesinghe, Alexander; Mundy, Elizabeth S; Smith, Melanie; Khosravi-Far, Roya; Martinou, Jean-Claude; Esposti, Mauro D
2005-04-01
Bid is a BH3-only member of the Bcl-2 family that regulates cell death at the level of mitochondrial membranes. Bid appears to link the mitochondrial pathway with the death receptor-mediated pathway of cell death. It is generally assumed that the f.l. (full-length) protein becomes activated after proteolytic cleavage, especially by apical caspases like caspase 8. The cleaved protein then relocates to mitochondria and promotes membrane permeabilization, presumably by interaction with mitochondrial lipids and other Bcl-2 proteins that facilitate the release of apoptogenic proteins like cytochrome c. Although the major action may reside in the C-terminus part, tBid (cleaved Bid), un-cleaved Bid also has pro-apoptotic potential when ectopically expressed in cells or in vitro. This pro-apoptotic action of f.l. Bid has remained unexplained, especially at the biochemical level. In the present study, we show that f.l. (full-length) Bid can insert specific lysolipids into the membrane surface, thereby priming mitochondria for the release of apoptogenic factors. This is most effective for lysophosphatidylcholine species that we report to accumulate in mitochondria during apoptosis induction. A Bid mutant that is not pro-apoptotic in vivo is defective in lysophosphatidylcholine-mediated membrane perturbation in vitro. Our results thus provide a biochemical explanation for the pro-apoptotic action of f.l. Bid.
Shehata, Mona Ah; Talaat, Raghda; Soliman, Samah; Elmesseri, Huda; Soliman, Shaimaa; Abd-Elsalam, Sherief
2017-10-01
Helicobacter pylori infection has become more and more resistant to conventional first-line treatment regimens. So, there is a considerable interest in evaluating new antibiotic combinations and regimens. Nitazoxanide is an anti-infective drug with demonstrated activity against protozoa and anaerobic bacteria including H. pylori. This work is designed to evaluate the efficacy and safety of a unique triple nitazoxanide-containing regimen as a treatment regimen in Egyptian patients with H. pylori infection. Two hundred and 24 patients with upper gastrointestinal tract (GIT) dyspeptic symptoms in whom H. pylori -induced GIT disease was confirmed were included in the study. They have been randomized to receive either nitazoxanide 500 mg b.i.d., clarithromycin 500 mg b.i.d., and omeprazole 40 mg twice daily for 14 days or metronidazole 500 mg b.i.d., clarithromycin 500 mg b.i.d., and omeprazole 40 mg twice daily for 14 days. Laboratory evaluation for H. pylori antigen within the stool was performed 6 weeks after cessation of H. pylori treatment regimens to assess the response. The response to treatment was significantly higher in group 1 of nitazoxanide treatment regimen than group 2 of traditional treatment regimen. One hundred and six cases (94.6%) of 112 patients who completed the study in group 1 showed complete cure, while only 63 cases (60.6%) of 104 patients who completed the study in group 2 showed the same response according to per-protocol (PP) analysis (P<.001). The regimen was well tolerated by all the patients enrolled in the study. Nitazoxanide-containing triple therapy is a promising therapy for the first-line eradication of H. pylori. (ClinicalTrials.gov Identifier: NCT02422706). © 2017 John Wiley & Sons Ltd.
Improving the design of competitive bidding in Medicare Advantage.
Cawley, John H; Whitford, Andrew B
2007-04-01
In 2003, Congress passed the Medicare Prescription Drug, Improvement, and Modernization Act, which required that in 2006 the Centers for Medicare and Medicaid Services (CMS) implement a system of competitive bids to set payments for the Medicare Advantage program. Managed care plans now bid for the right to enroll Medicare beneficiaries. Data from the first year of bidding suggest that imperfect competition is limiting the success of the bidding system. This article offers suggestions to improve this system based on findings from auction theory and previous government-run auctions. In particular, CMS can benefit by adjusting its system of competitive bids in four ways: credibly committing to regulations governing bidding; limiting the scope for collusion, entry deterrence, and predatory behavior among bidders; adjusting how benchmark reimbursement rates are set; and accounting for asymmetric information among bidders.
42 CFR 423.265 - Submission of bids and related information.
Code of Federal Regulations, 2014 CFR
2014-10-01
... to offer in the subsequent calendar year. (2) Substantial differences between bids. Potential Part D sponsors' bid submissions must reflect differences in benefit packages or plan costs that CMS determines to...) Bid submission—(1) General. Not later than the first Monday in June, each potential Part D sponsor...
42 CFR 423.265 - Submission of bids and related information.
Code of Federal Regulations, 2013 CFR
2013-10-01
... to offer in the subsequent calendar year. (2) Substantial differences between bids. Potential Part D sponsors' bid submissions must reflect differences in benefit packages or plan costs that CMS determines to...) Bid submission—(1) General. Not later than the first Monday in June, each potential Part D sponsor...
42 CFR 423.265 - Submission of bids and related information.
Code of Federal Regulations, 2012 CFR
2012-10-01
... to offer in the subsequent calendar year. (2) Substantial differences between bids. Potential Part D sponsors' bid submissions must reflect differences in benefit packages or plan costs that CMS determines to...) Bid submission—(1) General. Not later than the first Monday in June, each potential Part D sponsor...
42 CFR 423.265 - Submission of bids and related information.
Code of Federal Regulations, 2010 CFR
2010-10-01
... calendar year. (2) Substantial differences between bids. Potential Part D sponsors' bid submissions must reflect differences in benefit packages or plan costs that CMS determines to represent substantial...) General. Not later than the first Monday in June, each potential Part D sponsor must submit bids and...
42 CFR 423.265 - Submission of bids and related information.
Code of Federal Regulations, 2011 CFR
2011-10-01
... calendar year. (2) Substantial differences between bids. Potential Part D sponsors' bid submissions must reflect differences in benefit packages or plan costs that CMS determines to represent substantial...) General. Not later than the first Monday in June, each potential Part D sponsor must submit bids and...
77 FR 61001 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
... currently approved collection; Title of Information Collection: Bid Pricing Tool (BPT) for Medicare... organizations (MAO) and Prescription Drug Plans (PDP) are required to submit an actuarial pricing ``bid'' for... PDPs use the Bid Pricing Tool (BPT) software to develop their actuarial pricing bid. The information...
36 CFR 223.231 - Bidding methods.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Bidding methods. 223.231... Forest Products Advertisement and Bids § 223.231 Bidding methods. The Contracting Officer or designated... followed by oral auction. The method selected shall: (a) Ensure open and fair competition; (b) Ensure that...
36 CFR 223.231 - Bidding methods.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Bidding methods. 223.231... Forest Products Advertisement and Bids § 223.231 Bidding methods. The Contracting Officer or designated... followed by oral auction. The method selected shall: (a) Ensure open and fair competition; (b) Ensure that...
36 CFR 223.231 - Bidding methods.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Bidding methods. 223.231... Forest Products Advertisement and Bids § 223.231 Bidding methods. The Contracting Officer or designated... followed by oral auction. The method selected shall: (a) Ensure open and fair competition; (b) Ensure that...
36 CFR 223.231 - Bidding methods.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Bidding methods. 223.231... Forest Products Advertisement and Bids § 223.231 Bidding methods. The Contracting Officer or designated... followed by oral auction. The method selected shall: (a) Ensure open and fair competition; (b) Ensure that...
48 CFR 252.236-7008 - Contract prices-bidding schedules.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract prices-bidding... of Provisions And Clauses 252.236-7008 Contract prices—bidding schedules. As prescribed in 236.570(b)(6), use the following provision: Contract Prices—Bidding Schedules (DEC 1991) (a) The Government's...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Minimum bid. 3923.10 Section 3923.10 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR RANGE MANAGEMENT (4000) OIL SHALE LEASING Minimum Bid § 3923.10 Minimum bid. The...
47 CFR 90.801 - 900 MHz SMR spectrum subject to competitive bidding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Competitive Bidding Procedures for 900 MHz Specialized Mobile Radio Service § 90.801 900 MHz SMR spectrum subject to competitive bidding. Mutually exclusive initial applications for 900 MHz SMR service licenses are subject to competitive bidding. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-01
...; Submission for OMB Review; Bid Guarantees, Performance and Payment Bonds, and Alternative Payment Protections... concerning bid guarantees, performance and payment bonds, and alternative payment protections. A notice was...- 0045, Bid Guarantees, Performance, and Payment Bonds, and Alternative Payment Protections by any of the...
7 CFR 1435.502 - Bid selection procedures.
Code of Federal Regulations, 2013 CFR
2013-01-01
... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Processor Sugar Payment-In-Kind... acreage of sugar beets or sugarcane from production, CCC will rank bids on the basis of the bid amount as a percentage of the expected sugar produced from the retired acreage. Bids with the lowest of such...
48 CFR 14.401 - Receipt and safeguarding of bids.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Receipt and safeguarding of bids. 14.401 Section 14.401 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... bids shall be kept secure. Except as provided in paragraph (b) of this section, the bids shall not be...
48 CFR 14.401 - Receipt and safeguarding of bids.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Receipt and safeguarding of bids. 14.401 Section 14.401 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... bids shall be kept secure. Except as provided in paragraph (b) of this section, the bids shall not be...
75 FR 4701 - In the Matter of Procedural Amendments to Commission Part 1 Competitive Bidding Rules
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
... Procedural Amendments to Commission Part 1 Competitive Bidding Rules AGENCY: Federal Communications... bidding rules. The Commission amends the rule specifying how to report potential violations of the prohibition on certain communications in order to reduce the risk that bidding-related information might be...
Code of Federal Regulations, 2010 CFR
2010-10-01
... surety (see also power of attorney at 2.101). Bid means any response to a solicitation, including a... acquisition. Bid guarantee means a form of security assuring that the bidder (1) will not withdraw a bid... bid, unless a longer time is allowed, after receipt of the specified forms. Bond means a written...
48 CFR 52.219-2 - Equal Low Bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Equal Low Bids. 52.219-2 Section 52.219-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES... Low Bids. As prescribed in 19.308(c), insert the following provision: Equal Low Bids (OCT 1995) (a...
Fiscal Year 2012 United States Air Force Agency Financial Report
2012-01-01
Air Force Research Laboratory (AFRL) and Lawrence Livermore National Laboratory (LLNL) aggressively designed and tested an advanced warhead to...Reaper procurement & RPA capabilities, Light Attack Armed Reconnaissance buys, Joint Strike Fighter, satellites). Research , Development, Test and...Military Personnel Operations, Readiness & Support Procurement Research , Development, Test & Evaluation
Evaluation of Electric Power Procurement Strategies by Stochastic Dynamic Programming
NASA Astrophysics Data System (ADS)
Saisho, Yuichi; Hayashi, Taketo; Fujii, Yasumasa; Yamaji, Kenji
In deregulated electricity markets, the role of a distribution company is to purchase electricity from the wholesale electricity market at randomly fluctuating prices and to provide it to its customers at a given fixed price. Therefore the company has to take risk stemming from the uncertainties of electricity prices and/or demand fluctuation instead of the customers. The way to avoid the risk is to make a bilateral contact with generating companies or install its own power generation facility. This entails the necessity to develop a certain method to make an optimal strategy for electric power procurement. In such a circumstance, this research has the purpose for proposing a mathematical method based on stochastic dynamic programming and additionally considering the characteristics of the start-up cost of electric power generation facility to evaluate strategies of combination of the bilateral contract and power auto-generation with its own facility for procuring electric power in deregulated electricity market. In the beginning we proposed two approaches to solve the stochastic dynamic programming, and they are a Monte Carlo simulation method and a finite difference method to derive the solution of a partial differential equation of the total procurement cost of electric power. Finally we discussed the influences of the price uncertainty on optimal strategies of power procurement.
Analysis of non-melanoma skin cancer across the tofacitinib rheumatoid arthritis clinical programme.
Curtis, Jeffrey R; Lee, Eun Bong; Martin, George; Mariette, Xavier; Terry, Ketti K; Chen, Yan; Geier, Jamie; Andrews, John; Kaur, Mandeep; Fan, Haiyun; Nduaka, Chudy I
2017-01-01
Tofacitinib is an oral Janus kinase inhibitor for the treatment of rheumatoid arthritis (RA). We evaluated the incidence of non-melanoma skin cancer (NMSC) across the tofacitinib RA development programme. NMSC events (through August 2013) were identified in patients receiving tofacitinib in two Phase (P)1, eight P2, six P3 and two long-term extension (LTE) studies. In P123 studies, tofacitinib was administered at various doses (1-30 mg twice daily [BID], 20 mg once daily), as monotherapy or with conventional synthetic disease-modifying anti-rheumatic drugs, mainly methotrexate. In LTE studies, patients from qualifying P123 studies received tofacitinib 5 or 10 mg BID. Crude incidence rates (IRs; patients with events/100 patient-years) for first NMSC event were evaluated across doses and over time. In the overall population, comprising data from 18 studies (15,103 patient-years), 83 of 6092 tofacitinib-treated patients had NMSC events. The IR for NMSC (0.55 [95% confidence interval, 0.45-0.69] overall population) was stable up to 84 months of observation. IRs for tofacitinib 5 and 10 mg BID in combined P123 trials were 0.61 (0.34-1.10) and 0.47 (0.24-0.90), respectively. Corresponding IRs for LTE studies were 0.41 (0.26-0.66) and 0.79 (0.60-1.05). The IR for NMSC across the tofacitinib RA clinical development programme was low and remained stable over time. The IR for NMSC in LTE studies was numerically but not significantly higher with tofacitinib 10 versus 5 mg BID; an inverse dose relationship was observed in P123 trials. Longer follow-up is required to confirm these results.
NASA Technical Reports Server (NTRS)
1981-01-01
This phase consists of the engineering design, fabrication, assembly, operation, economic analysis, and process support R&D for an Experimental Process System Development Unit (EPSDU). The mechanical bid package was issued and the bid responses are under evaluation. Similarly, the electrical bid package was issued, however, responses are not yet due. The majority of all equipment is on order or has been received at the EPSDU site. The pyrolysis/consolidation process design package was issued. Preparation of process and instrumentation diagram for the free-space reactor was started. In the area of melting/consolidation, Kayex successfully melted chunk silicon and have produced silicon shot. The free-space reactor powder was successfully transported pneumatically from a storage bin to the auger feeder twenty-five feet up and was melted. The fluid-bed PDU has successfully operated at silane feed concentrations up to 21%. The writing of the operating manual has started. Overall, the design phase is nearing completion.
48 CFR 970.3102-05-18 - Independent research and development and bid and proposal costs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... development and bid and proposal costs. 970.3102-05-18 Section 970.3102-05-18 Federal Acquisition Regulations... Contract Cost Principles and Procedures 970.3102-05-18 Independent research and development and bid and proposal costs. (c) Independent Research and Development and Bid and Proposal costs are unallowable...
23 CFR 635.113 - Bid opening and bid tabulations.
Code of Federal Regulations, 2013 CFR
2013-04-01
... permitted. (b) The STD shall prepare and forward tabulations of bids to the Division Administrator. These tabulations shall be certified by a responsible STD official and shall show: (1) Bid item details for at least... opened and reviewed in accordance with the terms of the solicitation. The STD must use its own procedures...
23 CFR 635.113 - Bid opening and bid tabulations.
Code of Federal Regulations, 2014 CFR
2014-04-01
... permitted. (b) The STD shall prepare and forward tabulations of bids to the Division Administrator. These tabulations shall be certified by a responsible STD official and shall show: (1) Bid item details for at least... opened and reviewed in accordance with the terms of the solicitation. The STD must use its own procedures...
23 CFR 635.113 - Bid opening and bid tabulations.
Code of Federal Regulations, 2012 CFR
2012-04-01
... permitted. (b) The STD shall prepare and forward tabulations of bids to the Division Administrator. These tabulations shall be certified by a responsible STD official and shall show: (1) Bid item details for at least... opened and reviewed in accordance with the terms of the solicitation. The STD must use its own procedures...
23 CFR 635.113 - Bid opening and bid tabulations.
Code of Federal Regulations, 2011 CFR
2011-04-01
... permitted. (b) The STD shall prepare and forward tabulations of bids to the Division Administrator. These tabulations shall be certified by a responsible STD official and shall show: (1) Bid item details for at least... opened and reviewed in accordance with the terms of the solicitation. The STD must use its own procedures...
Code of Federal Regulations, 2010 CFR
2010-10-01
... marking of contractor bid or proposal information and source selection information. 1303.104-4 Section... PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 1303.104-4 Disclosure, protection and marking of contractor bid or proposal information and source selection information. Contractor bid or proposal...
42 CFR 422.256 - Review, negotiation, and approval of bids.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 3 2013-10-01 2013-10-01 false Review, negotiation, and approval of bids. 422.256..., and Related Information and Plan Approval § 422.256 Review, negotiation, and approval of bids. (a... aggregate bid amounts submitted under § 422.252 and conduct negotiations with MA organizations regarding...
42 CFR 422.256 - Review, negotiation, and approval of bids.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 3 2012-10-01 2012-10-01 false Review, negotiation, and approval of bids. 422.256..., and Related Information and Plan Approval § 422.256 Review, negotiation, and approval of bids. (a... aggregate bid amounts submitted under § 422.252 and conduct negotiations with MA organizations regarding...
42 CFR 422.256 - Review, negotiation, and approval of bids.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 3 2014-10-01 2014-10-01 false Review, negotiation, and approval of bids. 422.256..., and Related Information and Plan Approval § 422.256 Review, negotiation, and approval of bids. (a... aggregate bid amounts submitted under § 422.252 and conduct negotiations with MA organizations regarding...
42 CFR 422.256 - Review, negotiation, and approval of bids.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 3 2011-10-01 2011-10-01 false Review, negotiation, and approval of bids. 422.256... Information and Plan Approval § 422.256 Review, negotiation, and approval of bids. (a) Authority. Subject to... submitted under § 422.252 and conduct negotiations with MA organizations regarding these bids (including the...
42 CFR 422.256 - Review, negotiation, and approval of bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false Review, negotiation, and approval of bids. 422.256... Information and Plan Approval § 422.256 Review, negotiation, and approval of bids. (a) Authority. Subject to... submitted under § 422.252 and conduct negotiations with MA organizations regarding these bids (including the...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., and marking of contractor bid or proposal information and source selection information. 603.104-4... contractor bid or proposal information and source selection information. (a) The following classes of persons may be authorized to receive contractor bid or proposal information or source selection information by...
43 CFR 3422.3-1 - Bidding systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Bidding systems. 3422.3-1 Section 3422.3-1... systems. (a) The provisions of 10 CFR part 378 1 are not applicable to this part. 1 Redesignated as 30 CFR... cash bonus—fixed royalty bidding systems or any other bidding system adopted through rulemaking...
43 CFR 3422.3-1 - Bidding systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Bidding systems. 3422.3-1 Section 3422.3-1... systems. (a) The provisions of 10 CFR part 378 1 are not applicable to this part. 1 Redesignated as 30 CFR... cash bonus—fixed royalty bidding systems or any other bidding system adopted through rulemaking...
48 CFR 14.302 - Bid submission.
Code of Federal Regulations, 2010 CFR
2010-10-01
... paragraphs (b) and (c) below as the designated office) not later than the exact time set for opening of bids... later than the time set for the bid opening; (4) The telegraph office that received the telegraphic bid... indicates on its face that it was received in the telegraph office before the telephone call was received by...
75 FR 57052 - Notice of Single Family Loan Sale (SFLS 2010)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-17
... submitted and determine the successful bid or bids, in terms of the best value to HUD, in its sole and... Sale (SFLS 2010) AGENCY: Office of the Assistant Secretary for Housing--Federal Housing Commissioner... insurance, in a competitive, sealed bid sale (SFLS 2010). This notice also generally describes the bidding...
23 CFR 635.112 - Advertising for bids and proposals.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Advertising for bids and proposals. 635.112 Section 635... OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.112 Advertising for bids and proposals. (a) No work shall be undertaken on any Federal-aid project, nor shall any project be advertised for bids...
47 CFR 22.217 - Bidding credit for small businesses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Bidding credit for small businesses. 22.217... Bidding credit for small businesses. A winning bidder that qualifies as a small business, as defined in § 22.223(b)(1), or a consortium of small businesses may use a bidding credit of thirty-five (35...
43 CFR 5442.3 - Rejection of bids; waiver of minor deficiencies.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Rejection of bids; waiver of minor... Procedure § 5442.3 Rejection of bids; waiver of minor deficiencies. When the authorized officer determines... minor deficiencies in the bids or the timber sale advertisement. [38 FR 6280, Mar. 8, 1973] ...
47 CFR 22.217 - Bidding credit for small businesses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Bidding credit for small businesses. 22.217... Bidding credit for small businesses. A winning bidder that qualifies as a small business, as defined in § 22.223(b)(1), or a consortium of small businesses may use a bidding credit of thirty-five (35...
47 CFR 22.217 - Bidding credit for small businesses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Bidding credit for small businesses. 22.217... Bidding credit for small businesses. A winning bidder that qualifies as a small business, as defined in § 22.223(b)(1), or a consortium of small businesses may use a bidding credit of thirty-five (35...
47 CFR 22.217 - Bidding credit for small businesses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Bidding credit for small businesses. 22.217... Bidding credit for small businesses. A winning bidder that qualifies as a small business, as defined in § 22.223(b)(1), or a consortium of small businesses may use a bidding credit of thirty-five (35...
47 CFR 22.217 - Bidding credit for small businesses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Bidding credit for small businesses. 22.217... Bidding credit for small businesses. A winning bidder that qualifies as a small business, as defined in § 22.223(b)(1), or a consortium of small businesses may use a bidding credit of thirty-five (35...
22 CFR 201.25 - Bid and performance bonds and guaranties.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Bid and performance bonds and guaranties. 201... § 201.25 Bid and performance bonds and guaranties. Whenever the importer requires the posting of a bid bond or guaranty or performance bond or guaranty, the type of bond or guaranty (certified check...
Central Gulf of Mexico lease sale draws weak industry response
DOE Office of Scientific and Technical Information (OSTI.GOV)
Koen, A.D.
This paper reports that interest in oil and gas leases in the Gulf of Mexico continued spiraling downward at the latest Minerals Management Service offshore sale. Companies participating in Outer Continental Shelf Sale 139 last week in New Orleans offered 196 bids for 151 blocks in the central Gulf of Mexico. MMS offered 5,213 blocks for lease. The number of tracts receiving bids was the fewest at a central gulf lease sale since 114 tracts garnered high bids totaling $146.4 million at Sale 104 in April 1986. Apparent high bids in Sale 139 totaled $56,195,552, and all bids offered totaledmore » just $65,300,864. Both bidding totals were the lowest in a Gulf of Mexico lease sale since MMS began area-wide gulf leasing at Sale 72 in May 1983. Only 64 of 93 qualified companies participated in Sale 139. Fifty-five companies offered apparent winning bids. By comparison, 123 companies at central gulf lease Sale 131 in March 1991 offered 637 bids totaling $320.5 million for 464 tracts. Apparent high bids last spring totaled $259.9 million. At central gulf lease Sale 123 in March 1990, high bids totaled $427.4 million for 538 tracts. In that sale, BP Exploration Inc. led all bidders, exposing $78 million in 79 high bids, including 60 for deepwater tracts. Since then, interest in deepwater tracts has waned in part because of sagging oil and gas prices as U.S. operators sought bigger prospects outside the U.S. Ironically, Sale 139 was dominated by the U.S. subsidiary of an Italian holding company.« less
Mundorf, Thomas K; Ogawa, Takahiro; Inui, Noritsugu; Naka, Hiroaki; Novack, Gary D; Crockett, R Stephens
2005-03-01
A new formulation of timolol with sorbic acid, timolol-LA (TLA) (Istaloldagger), has been developed which increases its ocular bioavailability. In the present study, we desired to evaluate the ocular comfort and systemic bioavailability of TLA in healthy volunteers in comparison to standard timolol maleate ophthalmic solution (TIM). This study was a randomized, double-masked, active-controlled, crossover evaluation of 0.5% TLA and 0.5% TIM, bid, in 12 normal healthy volunteers. Visits were at Days 0, 1, 2, 4 and 8 in each period, and there was a minimum 7 day interperiod washout. At all three post-dosing evaluation times (Day 1: Peak, Day 8: Trough, and Day 8: Peak), the 95% confidence interval for the difference between TLA and TIM was not more than 0.37 ng/mL. After administration of TLA, there was a greater incidence of burning/stinging and tearing, but not foreign body sensation, relative to TIM. In general, most symptoms were mild in intensity, and no subject discontinued treatment due to ocular discomfort. Both treatments decreased IOP to a similar level. TLA was relatively comfortable, with a safety profile consistent with further clinical development, and, with bid dosing (exaggerated [2X] that anticipated for clinical use), had a systemic bioavailability similar to that of TIM 0.5%, bid. The incidence of burning and stinging was higher with TLA than with TIM, although reports were mild in severity and did not result in any patient discontin uations. Although the results are of interest, further evaluation in a larger trial may be warranted.
Pharmacoeconomic comparison of Helicobacter pylori eradication regimens.
Sancar, Mesut; Izzettin, Fikret Vehbi; Apikoglu-Rabus, Sule; Besisik, Fatih; Tozun, Nurdan; Dulger, Gul
2006-08-01
Helicobacter pylori is the most important etiologic agent for development of peptic ulcer, chronic gastritis and gastric carcinomas. It is now well established that H. pylori eradication treatment is more cost-effective than acid suppressing therapies alone for the treatment of peptic ulcer disease. However, the comparative cost-effectiveness of various H. pylori eradication regimens is still not clear. This study was designed to make a pharmacoeconomic comparison of different H. pylori eradication regimens in patients with peptic ulcer disease or chronic gastritis, using real-world cost and effectiveness data. Istanbul University Hospital and Marmara University Hospital. A total of 75 patients diagnosed as H. pylori (+) by endoscopy were randomized to receive one of the seven H. pylori treatment protocols. These protocols were as follows: (LAC) = 'lansoprazole 30 mg bid + amoxicillin 1 g bid + clarithromycin 500 mg bid' for 7 days and (OCM) = 'omeprazole 20 mg bid + clarithromycin 250 mg bid + metronidazole 500 mg bid'; (OAM) = 'omeprazole 40 mg qd + amoxicillin 500 mg tid + metronidazole 500 mg tid'; (MARB) = 'metronidazole 250 mg tid + amoxicillin 500 mg qid + ranitidine 300 mg hs + bismuth 300 mg qid'; (OAC) = omeprazole 20 mg bid + amoxicillin 1 g bid + clarithromycin 500 mg bid'; (OCA) = omeprazole 40 mg bid + clarithromycin 500 mg bid + amoxicillin 1 g bid'; (OAB) = 'omeprazole 20 mg bid + amoxicillin 500 mg tid + bismuth 300 mg qid' each for 14 days. Only direct costs were included in the analysis. Effectiveness was measured in terms of "successful eradication". The cost-effectiveness ratios of the regimens were calculated using these effectiveness and cost data. The perspective of the study was assumed as the Government's perspective. Cost-effectiveness ratios of eradication regimens. MARB and OCA regimens were found to be more cost-effective than the other treatment regimens. The eradication rates and cost-effectiveness ratios calculated for these protocols were 90% (158.7 euros) for MARB and 90% (195.8 euros) for OCA regimen. This study confirms the importance of using local pharmacoeconomic data. Analyses such as this give decision-makers the tools to choose a better treatment option which is both highly effective yet and has a low cost.
NASA Astrophysics Data System (ADS)
Myers, Erica Catherine
This dissertation combines research on three topics in applied energy economics. The first two papers investigate whether consumers are informed about and pay attention to energy costs in residential housing. The first paper explores this issue in the rental housing market, while the second paper focuses on housing purchases. The third paper, based on joint work with AJ Bostian and Harrison Fell, uses a laboratory experiment to test the effects of positive versus negative cost shocks on mulit-unit procurement auction performance. The first paper explores whether there are energy cost information asymmetries between landlords and tenants. If tenants are uninformed about energy costs, landlords cannot capitalize energy efficiency investments into higher rents, leading to under-investment. I exploit variation in energy costs in the form of relative heating fuel price changes in the northeastern United States where some apartment units heat with oil and some units heat with natural gas. I develop a search model to describe the matching of landlords and tenants, and derive predictions about the incidence of relative fuel price changes, tenant turnover, and efficiency investments under both symmetric and asymmetric information. My model predicts that, under symmetric full information, these outcomes will not differ depending on whether landlords or tenants pay for energy. In contrast, under asymmetric information, the demand of uninformed tenants for units that heat with oil rather than gas will not shift when oil prices rise relative to gas prices. In a search model, this leads to different market outcomes when landlords, rather than tenants, pay for energy. I find that the capitalization of energy prices into rents, turnover rates, and energy efficiency investments differ between the two payment regimes in ways that are consistent with asymmetric information. The second paper explores whether home buyers are myopic about future energy costs. I exploit variation in energy costs in the form of fuel price changes in Massachusetts where there is an even distribution of homes that heat with oil and homes that heat with natural gas. I find that relative fuel price shifts cause relative changes in housing transaction prices that are consistent with full capitalization of the present value of future energy cost differences under low discount rates. These findings are consistent with home buyers being attentive to energy costs at point of sale and are not consistent with myopia. The third paper uses a laboratory experiment to test the effects of positive versus negative costs shocks on multi-unit procurement auction performance. Output prices tend to respond more quickly to increases in input prices than to decreases in input prices. While standard economic theory would not predict this pattern, it is found in many market settings. We compare outcomes in uniform price and discriminatory (pay-as-bid) auctions for two different kinds of costs shocks. First we look at ''industry wide'' cost shocks where the cost of a common input changes uniformly for all bidders. We also look at idiosyncratic cost shocks, where bidders' individual costs are changing, but the expected Walrasian price remains fixed. We find evidence for a new explanation of asymmetric passthrough in multi-unit procurement auctions related to the bidding incentives in discriminatory auctions. Discriminatory auctions may be worse than uniform at ''tracking'' shifts in underlying costs, leading to price adjustment asymmetries and production inefficiencies.
Materials characterization studies on LANA75/85 materials for replacement beds
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shanahan, Kirk L.
2016-12-30
During FY15 and FY16, a purchase order (PO) was placed with Japan Metals and Chemicals, USA after an open bidding procurement process for 282 kg of LaNi 4.25Al 0.75 and 226 kg. of LaNi 4.15Al 0.85. These materials were to be used in Tritium Facility replacement beds for existing beds that have reached the end of their useful life. As part of the PO, a 100 g. sample of each material was delivered to the SRNL Hydrogen Processing Group for characterization studies as is typically done for all newly acquired hydride materials. The PO actually employed a “trust but verify”more » approach where JMCUSA was allowed to ship materials it felt met specifications without SRS confirmation, as long as the data used to do so was delivered to SRS as part of the PO documentation package. Subsequent SRNL analysis revealed that the material met all specifications and was of very high quality. This report documents those findings.« less
25 CFR 166.221 - How do I acquire an advertised permit through competitive bidding?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false How do I acquire an advertised permit through competitive... permit through competitive bidding? (a) As part of the negotiation of a permit, Indian landowners may... responsible bidder(s), which may require further competitive bidding after the bid opening; and (4) Prepare...
25 CFR 166.221 - How do I acquire an advertised permit through competitive bidding?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false How do I acquire an advertised permit through competitive... permit through competitive bidding? (a) As part of the negotiation of a permit, Indian landowners may... responsible bidder(s), which may require further competitive bidding after the bid opening; and (4) Prepare...
26 CFR 403.61 - Sale on open, competitive bids.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 26 Internal Revenue 18 2013-04-01 2013-04-01 false Sale on open, competitive bids. 403.61 Section... open, competitive bids. If forfeited property is to be sold at public auction to the highest bidder on open, competitive bids, the notice of sale shall so specify, and state the date, hour, and place of...
26 CFR 403.61 - Sale on open, competitive bids.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Sale on open, competitive bids. 403.61 Section... open, competitive bids. If forfeited property is to be sold at public auction to the highest bidder on open, competitive bids, the notice of sale shall so specify, and state the date, hour, and place of...
26 CFR 403.61 - Sale on open, competitive bids.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 26 Internal Revenue 18 2012-04-01 2012-04-01 false Sale on open, competitive bids. 403.61 Section... open, competitive bids. If forfeited property is to be sold at public auction to the highest bidder on open, competitive bids, the notice of sale shall so specify, and state the date, hour, and place of...
26 CFR 403.61 - Sale on open, competitive bids.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 26 Internal Revenue 18 2011-04-01 2011-04-01 false Sale on open, competitive bids. 403.61 Section... open, competitive bids. If forfeited property is to be sold at public auction to the highest bidder on open, competitive bids, the notice of sale shall so specify, and state the date, hour, and place of...
26 CFR 403.61 - Sale on open, competitive bids.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 26 Internal Revenue 18 2014-04-01 2014-04-01 false Sale on open, competitive bids. 403.61 Section... open, competitive bids. If forfeited property is to be sold at public auction to the highest bidder on open, competitive bids, the notice of sale shall so specify, and state the date, hour, and place of...
25 CFR 215.8 - Submission of bids.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Submission of bids. 215.8 Section 215.8 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS LEAD AND ZINC MINING OPERATIONS AND LEASES, QUAPAW AGENCY § 215.8 Submission of bids. At the time of public auction bidders may submit their bids in...
47 CFR 101.1208 - Bidding credits for small businesses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bidding credits for small businesses. 101.1208... Bidding credits for small businesses. A winning bidder that qualifies as a small business or a consortium of small businesses, (as defined in § 101.1209(b)(1)(i) may use a bidding credit of 25 percent to...
47 CFR 90.810 - Bidding credits for small businesses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bidding credits for small businesses. 90.810... Radio Service § 90.810 Bidding credits for small businesses. A winning bidder that qualifies as a small business, as defined in § 90.814(b)(1), or a consortium of small businesses may use a bidding credit of 15...
Code of Federal Regulations, 2010 CFR
2010-10-01
....2110, a statement to that effect and a declaration, under penalty of perjury, that the applicant is... the post-auction market structure. (ix) Certification under penalty of perjury that it has not entered... amount of their bids, bidding strategies or the particular licenses on which they will or will not bid...
47 CFR 90.810 - Bidding credits for small businesses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Bidding credits for small businesses. 90.810... Radio Service § 90.810 Bidding credits for small businesses. A winning bidder that qualifies as a small business, as defined in § 90.814(b)(1), or a consortium of small businesses may use a bidding credit of 15...
47 CFR 90.810 - Bidding credits for small businesses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Bidding credits for small businesses. 90.810... Radio Service § 90.810 Bidding credits for small businesses. A winning bidder that qualifies as a small business, as defined in § 90.814(b)(1), or a consortium of small businesses may use a bidding credit of 15...
47 CFR 101.1208 - Bidding credits for small businesses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 5 2013-10-01 2013-10-01 false Bidding credits for small businesses. 101.1208... Bidding credits for small businesses. A winning bidder that qualifies as a small business or a consortium of small businesses, (as defined in § 101.1209(b)(1)(i) may use a bidding credit of 25 percent to...
47 CFR 90.810 - Bidding credits for small businesses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 5 2013-10-01 2013-10-01 false Bidding credits for small businesses. 90.810... Radio Service § 90.810 Bidding credits for small businesses. A winning bidder that qualifies as a small business, as defined in § 90.814(b)(1), or a consortium of small businesses may use a bidding credit of 15...
47 CFR 101.1208 - Bidding credits for small businesses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Bidding credits for small businesses. 101.1208... Bidding credits for small businesses. A winning bidder that qualifies as a small business or a consortium of small businesses, (as defined in § 101.1209(b)(1)(i) may use a bidding credit of 25 percent to...
47 CFR 90.810 - Bidding credits for small businesses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Bidding credits for small businesses. 90.810... Radio Service § 90.810 Bidding credits for small businesses. A winning bidder that qualifies as a small business, as defined in § 90.814(b)(1), or a consortium of small businesses may use a bidding credit of 15...
47 CFR 101.1208 - Bidding credits for small businesses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Bidding credits for small businesses. 101.1208... Bidding credits for small businesses. A winning bidder that qualifies as a small business or a consortium of small businesses, (as defined in § 101.1209(b)(1)(i) may use a bidding credit of 25 percent to...
47 CFR 101.1208 - Bidding credits for small businesses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Bidding credits for small businesses. 101.1208... Bidding credits for small businesses. A winning bidder that qualifies as a small business or a consortium of small businesses, (as defined in § 101.1209(b)(1)(i) may use a bidding credit of 25 percent to...
Hospital materials managers need to be aware of actions that constitute legal acceptance.
Decker, R
1990-12-01
A hospital invited bids for building materials for a hospital construction project. A supplier submitted a bid which asked the hospital to sign and return a trade association form contract. The hospital didn't return the form but used the supplier's bid as part of the general contract for the entire project and notified the supplier and the general contractor. Later, the supplier submitted a higher bid for the same material contending that the hospital hadn't accepted the first bid as they hadn't followed the instructions. The hospital materials manager feels that the bid was properly accepted. In this dialogue, Dr. Decker reviews the legal issues involved in the different ways of accepting an offer.
Giovannoni, Gavin; Gold, Ralf; Fox, Robert J; Kappos, Ludwig; Kita, Mariko; Yang, Minhua; Sarda, Sujata P; Zhang, Ray; Viglietta, Vissia; Havrdova, Eva
2015-11-01
The purpose was to report the effects of delayed-release dimethyl fumarate (DMF; also known as gastro-resistant DMF) on the number of relapses requiring intravenous (IV) steroids and multiple sclerosis (MS)-related hospitalizations using integrated data from the Phase III DEFINE and CONFIRM studies. DEFINE and CONFIRM were randomized, double-blind, placebo-controlled, multicenter studies that evaluated the efficacy and safety of DMF over a 2-year period in patients with relapsing-remitting MS (RRMS). Patients were randomized (1:1:1) to receive oral DMF 240 mg BID or TID, placebo, or glatiramer acetate (CONFIRM only). Eligible subjects (aged 18-55 years) had an EDSS score of 0-5.0 and experienced either ≥1 relapse in the 12 months or had ≥1 gadolinium-enhanced lesion on brain MRI in the 6 weeks, before randomization. Data DEFINE and CONFIRM were pooled and analyzed using a negative binomial regression model (adjusted for study and region). Data obtained after subjects switched to an alternative MS therapy were not included in the analysis. Only relapses confirmed by the Independent Neurology Evaluation Committee were included in the analysis of relapses requiring IV steroids. The study population (intention-to-treat) comprised 2301 patients who received either placebo (n = 771), DMF BID (n = 769), or DMF TID (n = 761). Baseline demographic and disease characteristics were generally well balanced among treatment groups. Throughout the 2-year studies, the total number of relapses treated with methylprednisolone was 402, 221, and 209 in the placebo, DMF BID, and DMF TID groups, respectively. A smaller proportion of patients in the DMF BID (168 of 769 [21.8%]) and DMF TID (151 of 761 [19.8%]) groups experienced ≥1 relapse requiring IV steroids compared with the placebo group (284 of 771 [36.8%]). The total number of MS-related hospitalizations over 2 years was 136, 94, and 74 in the placebo, DMF BID, and DMF TID groups. A smaller proportion of patients in the DMF BID (73 of 769 [9.5%]) and DMF TID (57 of 761 [7.5%]) groups had ≥1 MS-related hospitalization compared with the placebo group (104 of 771 [13.5%]). DMF is an effective and well tolerated therapy for RRMS. In addition to clinical benefits, the use of DMF may be associated with reduced patient burden and health economic savings, resulting from a decrease in resource utilization associated with relapses. ClinicalTrials.gov identifiers: NCT00420212 and NCT00451451. Copyright © 2015 Elsevier HS Journals, Inc. All rights reserved.
Management of hyperglycemia associated with pasireotide (SOM230): healthy volunteer study.
Breitschaft, Astrid; Hu, Ke; Hermosillo Reséndiz, Karina; Darstein, Christelle; Golor, Georg
2014-03-01
Pasireotide, a multireceptor-targeted somatostatin analogue with efficacy in Cushing's disease and acromegaly, can affect glucose metabolism due to inhibition of insulin secretion and incretin hormone responses. A study was therefore conducted to evaluate different antihyperglycemic drugs in the management of pasireotide-associated hyperglycemia. This was a 1-week, Phase I, open-label study. Healthy male volunteers were randomized to pasireotide 600 μg sc bid alone or co-administered with metformin 500 mg po bid, nateglinide 60 mg po tid, vildagliptin 50mg po bid, or liraglutide 0.6 mg sc qd. An oral glucose tolerance test (OGTT) was performed on days 1 and 7 to evaluate effects on serum insulin, plasma glucose and glucagon levels. Safety/tolerability and pharmacokinetic effects were also evaluated. Ninety healthy male volunteers were enrolled (n=18 per arm). After 7 days of treatment, plasma glucose AUC post-OGTT increased by 69% with pasireotide alone. The effect was reduced by 13%, 29%, 45% and 72% with co-administration of metformin, nateglinide, vildagliptin and liraglutide, respectively. On day 7, compared with pasireotide alone, the decrease in serum insulin was attenuated with nateglinide, metformin, liraglutide and vildagliptin co-administration (levels were 3%, 6%, 34% and 71% higher, respectively). Minimal changes in plasma glucagon were observed. Adverse events were consistent with the safety profiles of the drugs used. Vildagliptin and liraglutide were most effective in minimizing pasireotide-associated hyperglycemia in healthy volunteers. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.
Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction
NASA Astrophysics Data System (ADS)
Trusaji, Wildan; Akbar, Muhammad; Sukoyo; Irianto, Dradjad
2018-03-01
In making bearing procurement analysis, price and its reliability must be considered as decision criteria, since price determines the direct cost as acquisition cost and reliability of bearing determine the indirect cost such as maintenance cost. Despite the indirect cost is hard to identify and measured, it has high contribution to overall cost that will be incurred. So, the indirect cost of reliability must be considered when making bearing procurement analysis. This paper tries to explain bearing evaluation method with the total cost of ownership analysis to consider price and maintenance cost as decision criteria. Furthermore, since there is a lack of failure data when bearing evaluation phase is conducted, reliability prediction method is used to predict bearing reliability from its dynamic load rating parameter. With this method, bearing with a higher price but has higher reliability is preferable for long-term planning. But for short-term planning the cheaper one but has lower reliability is preferable. This contextuality can give rise to conflict between stakeholders. Thus, the planning horizon needs to be agreed by all stakeholder before making a procurement decision.
An assessment of the net value of CSP systems integrated with thermal energy storage
Mehos, M.; Jorgenson, J.; Denholm, P.; ...
2015-05-01
Within this study, we evaluate the operational and capacity value—or total system value—for multiple concentrating solar power (CSP) plant configurations under an assumed 33% renewable penetration scenario in California. We calculate the first-year bid price for two CSP plants, including a 2013 molten-salt tower integrated with a conventional Rankine cycle and a hypothetical 2020 molten-salt tower system integrated with an advanced supercritical carbon-dioxide power block. The overall benefit to the regional grid, defined in this study as the net value, is calculated by subtracting the first-year bid price from the total system value.
Evaluation of Selected Chemical Processes for Production of Low-cost Silicon, Phase 3
NASA Technical Reports Server (NTRS)
Blocher, J. M.; Browning, M. F.
1979-01-01
Refinements of the design of the 50 MT/year Experimental Process System Development Unit were made and competitive bids were received from mechanical, electrical, and structural contractors. Bids on most of the equipment were received and cataloged. Emergency procedures were defined to counter a variety of contingencies disclosed in operations and safety reviews. Experimental work with an electrolytic cell for zinc chloride disclosed no significant increase in power efficiency by steps taken to increase electrolyte circulation. On the basis of materials compatibility and permeability tests, 310 stainless steel was chosen for the shell of the fluidized-bed reactor and SiC-coated graphite for the liner.
Zhu, X Y; Du, J; Wu, J; Zhao, L W; Meng, X; Liu, G F
2017-08-08
Objective: To evaluate the efficacy and safety of Saccharomyces boulardii Sachets combined with bismuth quadruple therapy for initial Helicobacter pylori ( H . pylori ) eradication. Methods: From March 2014 to March 2015, 240 participants from the third hospital of Hebei medical university with H . pylori infection were recruited and randomized into three groups: Quadruple therapy group received bismuth potassium citrate 220 mg bid + Rabeprazole 10 mg bid + amoxicillin 1 000 mg bid+ furazolidone 100 mg bid for 10 days. Short-term group and long-term group received the same quadruple therapy for 10 days as above, as well as Saccharomyces boulardii Sachets 500 mg bid for 14 days and 28 days, respectively. H . pylori eradication was confirmed by (13)C/(14)C-UBT at least 4 weeks after completion of therapy. And side effects were investigated during the therapy. Results: The H . pylori eradication rates in quadruple therapy, short-term and long-term group were 80%, 87.5% and 87.5% by ITT analysis ( P =0.321) and 92.8%, 94.6% and 95.9% by PP analysis ( P =0.717), respectively. The overall side effect rate and occurrence of diarrhea and abdominal distension were significantly lower in short-term or long-term group as compared with quadruple therapy group( P =0.007, 0.003, 0.004), but there was no significant difference between the two probiotics groups. Conclusions: Both short and long-term Saccharomyces boulardii Sachets reduced the overall side effect rate and occurrence of diarrhea or abdominal distension when combined with bismuth quadruple therapy for initial H . pylori eradication and no difference was observed in efficacy or safety between the two groups.
Stein Gold, Linda F; Spelman, Lynda; Spellman, Mary C; Hughes, Matilda H; Zane, Lee T
2015-12-01
Crisaborole is a novel, boron-based, small-molecule, topical phosphodiesterase-4 inhibitor in development for the treatment of patients with mild to moderate atopic dermatitis (AD). In this multicenter, randomized, double-blind, dose-ranging, phase 2 study, adolescent patients 12 to 17 years of age with mild to moderate AD and 2 distinct target AD lesions were randomized to once-daily (QD) or twice-daily (BID) treatment with crisaborole topical ointment. For each patient, 2 target lesions were randomized to receive 29 days of treatment with 0.5% or 2% crisaborole topical ointment. The primary endpoint was change from baseline in AD severity index (ADSI) score for each lesion. Exploratory efficacy endpoints and safety were also assessed. A total of 86 patients were enrolled and received crisaborole topical ointment 0.5% or 2% QD (n=44) or BID (n=42). All dosing regimens produced dose-related improvements in ADSI as well as in all 5 component signs and symptoms of AD (erythema, excoriation, exudation, lichenification, and pruritus). The greatest improvements were consistently observed with crisaborole topical ointment, 2% applied BID. With this regimen, ADSI improved from baseline by 71%, and total or partial clearance of target lesions (ADSI ≤ 2) was achieved by 62% of patients after 29 days of treatment. Both doses of crisaborole topical ointment were well tolerated; mild application site reactions were the only treatment-related adverse events (QD, n=3; BID, n=1). These results provide preliminary evidence of the efficacy and safety of crisaborole topical ointment, 2% applied topically BID in adolescents with mild to moderate AD.
One-year treatment with mometasone furoate in chronic obstructive pulmonary disease
Calverley, Peter MA; Rennard, Stephen; Nelson, Harold S; Karpel, Jill P; Abbate, Eduardo H; Stryszak, Paul; Staudinger, Heribert
2008-01-01
Many patients with chronic obstructive pulmonary disease (COPD) are treated with twice daily (BID) inhaled corticosteroids (ICS). This study evaluated whether daily PM mometasone furoate administered via a dry powder inhaler (MF-DPI) was equally effective compared to twice daily dosing. In a 52-week, randomized, double-blind, placebo-controlled study, 911 subjects with moderate-to-severe COPD managed without ICS received MF-DPI 800 μg QD PM, MF-DPI 400 μg BID, or placebo. The change from baseline in postbronchodilator forced expiratory volume in 1 second (FEV1), total COPD symptom scores, and health status as well as the percentage of subjects with a COPD exacerbation were assessed. Adverse events were recorded. Mometasone furoate administered via a dry powder inhaler 800 μg QD PM and 400 μg BID significantly increased postbronchodilator FEV1 from baseline (50 mL and 53 mL, respectively, versus a 19 mL decrease for placebo; P < 0.001). The percentage of subjects exacerbating was significantly lower in the pooled MF-DPI groups than in the placebo group (P = 0.043). Subjects receiving MF-DPI 400 μg BID reported a statistically significant (19%) reduction in COPD symptom scores compared with placebo (P < 0.001). Health status as measured with St. George's Respiratory Questionnaire (SGRQ) improved significantly in all domains (Total, Activity, Impacts, and Symptoms) in the pooled MF-DPI groups versus placebo (P ≤ 0.031). MF-DPI treatment was well tolerated. Once-daily MF-DPI improved lung function and health status in subjects with moderate-to-severe COPD and was comparable to BID MF-DPI. PMID:19014549
Rampurwala, Murtuza; Wisinski, Kari B; Burkard, Mark E; Ehsani, Sima; O’Regan, Ruth M; Carmichael, Lakeesha; Kim, KyungMann; Kolesar, Jill; Tevaarwerk, Amye J
2017-01-01
Intro Suppressing both androgens and estrogens may circumvent hormone receptor resistance in breast cancer by reducing androgen receptor stimulation. Selective inhibition of the 17, 20-lyase enzyme by orteronel leads to decreased androgen production in men and would be anticipated to reduce estrogen and androgen production in women. Thus, we conducted a phase 1b study of orteronel in postmenopausal women with hormone-receptor positive (HR+) metastatic breast cancer. Methods The primary objective was to identify the recommended phase 2 dose (R2PD) of orteronel in women; escalation was via standard 3+3 design. The initial dose was 300 mg BID and escalated to 400 mg BID. Cycle length was 28 days. Enrolled patients had HR+ metastatic breast cancer and were evaluated every 8 weeks for disease progression. Results Eight heavily pre-treated women enrolled [median age: 57 yo (range 47–73)]. Four received 300 mg BID at dose level 1; 4 received 400 mg BID at dose level 2. No dose limiting toxicities (DLTs) were observed. Adverse events (AE) at least possibly related to orteronel included grade 1–2 nausea (n=4) and bone pain (n=3), and grade 1 hypokalemia, hot flashes, myalgia and AST elevation (n=2). The only grade 3 AE was hypertension (n=2) with 8 patients receiving 34 cycles of treatment. No objective responses were seen; clinical benefit was seen in 2 patients with stable disease for more than 6 months. Serum estrogens and testosterone were suppressed from baseline on both doses of orteronel. Conclusions Orteronel 400 mg BID is well tolerated in postmenopausal women, and significantly suppresses serum estrogens and testosterone. Clinical benefit was seen among heavily pretreated postmenopausal women with HR+ metastatic breast cancer. PMID:27826831
Reiffel, James A; Camm, A John; Belardinelli, Luiz; Zeng, Dewan; Karwatowska-Prokopczuk, Ewa; Olmsted, Ann; Zareba, Wojciech; Rosero, Spencer; Kowey, Peter
2015-10-01
Atrial fibrillation (AF) requires arrhythmogenic changes in atrial ion channels/receptors and usually altered atrial structure. AF is commonly treated with antiarrhythmic drugs; the most effective block many ion channels/receptors. Modest efficacy, intolerance, and safety concerns limit current antiarrhythmic drugs. We hypothesized that combining agents with multiple anti-AF mechanisms at reduced individual drug doses might produce synergistic efficacy plus better tolerance/safety. HARMONY tested midrange ranolazine (750 mg BID) combined with 2 reduced dronedarone doses (150 mg BID and 225 mg BID; chosen to reduce dronedarone's negative inotropic effect-see text below) over 12 weeks in 134 patients with paroxysmal AF and implanted pacemakers where AF burden (AFB) could be continuously assessed. Patients were randomized double-blind to placebo, ranolazine alone (750 mg BID), dronedarone alone (225 mg BID), or one of the combinations. Neither placebo nor either drugs alone significantly reduced AFB. Conversely, ranolazine 750 mg BID/dronedarone 225 mg BID reduced AFB by 59% versus placebo (P=0.008), whereas ranolazine 750 mg BID/dronedarone 150 mg BID reduced AFB by 43% (P=0.072). Both combinations were well tolerated. HARMONY showed synergistic AFB reduction by moderate dose ranolazine plus reduced dose dronedarone, with good tolerance/safety, in the population enrolled. ClinicalTrials.gov; Unique identifier: NCT01522651. © 2015 American Heart Association, Inc.
Gavin, Amelia R.; Simon, Greg E.; Ludman, Evette J.
2011-01-01
Objective We examine the mediating role of body image dissatisfaction (BID) on the association between obesity and depression and the variation of this association as a function of years of education among a population-based sample of women aged 40–65 years. Methods A series of sample-weighted logistic regression models were used to estimate the associations between obesity, BID, and depression, stratified by educational attainment. Data were obtained from a structured telephone interview of 4543 female health plan enrollees, including self-reported height and weight, the Patient Health Questionnaire assessment of depression, and a single-item measure of BID. Results Among those with <16 years of education, in both the unadjusted and adjusted models, obesity and BID were significantly associated with depression. Similarly, among those with ≥16 years of education, obesity and BID were significantly associated with depression in the unadjusted models. However, in the adjusted model, only BID was associated with depression. A formal test for mediation suggests that the association between obesity and depression was mediated by BID regardless of level of education. Conclusions Our data suggest that BID-mediated the obesity-depression association. In addition, obesity and BID may be salient risk factors for depression among middle-aged women as a function of the level of education. PMID:21109045
Evolutionary Dynamics of Biological Auctions
Chatterjee, Krishnendu; Reiter, Johannes G.; Nowak, Martin A.
2011-01-01
Many scenarios in the living world, where individual organisms compete for winning positions (or resources), have properties of auctions. Here we study the evolution of bids in biological auctions. For each auction n individuals are drawn at random from a population of size N. Each individual makes a bid which entails a cost. The winner obtains a benefit of a certain value. Costs and benefits are translated into reproductive success (fitness). Therefore, successful bidding strategies spread in the population. We compare two types of auctions. In “biological all-pay auctions” the costs are the bid for every participating individual. In “biological second price all-pay auctions” the cost for everyone other than the winner is the bid, but the cost for the winner is the second highest bid. Second price all-pay auctions are generalizations of the “war of attrition” introduced by Maynard Smith. We study evolutionary dynamics in both types of auctions. We calculate pairwise invasion plots and evolutionarily stable distributions over the continuous strategy space. We find that the average bid in second price all-pay auctions is higher than in all-pay auctions, but the average cost for the winner is similar in both auctions. In both cases the average bid is a declining function of the number of participants, n. The more individuals participate in an auction the smaller is the chance of winning, and thus expensive bids must be avoided. PMID:22120126
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-05
... bid is received or the sale is cancelled. Sealed bid envelopes must be clearly marked on the front lower left-hand corner with ``SEALED BID BLM LAND SALE, MNES-056512''. The bid envelope must contain a... of Land Management. Personal checks will not be accepted. Failure to submit the remainder of the full...
46 CFR Sec. 4 - Procedure for securing competitive bids.
Code of Federal Regulations, 2013 CFR
2013-10-01
... not subject to the Davis-Bacon Act. (g) The Invitations for Bids shall also include a statement of the... Authority may orally contact as many qualified contractors as is feasible, in order to obtain written “Spot... contractor shall be verbally advised of a time and place for the submission of the “Spot Bids.” If such bids...
46 CFR Sec. 4 - Procedure for securing competitive bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... not subject to the Davis-Bacon Act. (g) The Invitations for Bids shall also include a statement of the... Authority may orally contact as many qualified contractors as is feasible, in order to obtain written “Spot... contractor shall be verbally advised of a time and place for the submission of the “Spot Bids.” If such bids...
46 CFR Sec. 4 - Procedure for securing competitive bids.
Code of Federal Regulations, 2011 CFR
2011-10-01
... not subject to the Davis-Bacon Act. (g) The Invitations for Bids shall also include a statement of the... Authority may orally contact as many qualified contractors as is feasible, in order to obtain written “Spot... contractor shall be verbally advised of a time and place for the submission of the “Spot Bids.” If such bids...
46 CFR Sec. 4 - Procedure for securing competitive bids.
Code of Federal Regulations, 2014 CFR
2014-10-01
... not subject to the Davis-Bacon Act. (g) The Invitations for Bids shall also include a statement of the... Authority may orally contact as many qualified contractors as is feasible, in order to obtain written “Spot... contractor shall be verbally advised of a time and place for the submission of the “Spot Bids.” If such bids...
46 CFR Sec. 4 - Procedure for securing competitive bids.
Code of Federal Regulations, 2012 CFR
2012-10-01
... not subject to the Davis-Bacon Act. (g) The Invitations for Bids shall also include a statement of the... Authority may orally contact as many qualified contractors as is feasible, in order to obtain written “Spot... contractor shall be verbally advised of a time and place for the submission of the “Spot Bids.” If such bids...
48 CFR 52.214-25 - Step Two of Two-Step Sealed Bidding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Step Two of Two-Step... Clauses 52.214-25 Step Two of Two-Step Sealed Bidding. As prescribed in 14.201-6(t), insert the following provision: Step Two of Two-Step Sealed Bidding (APR 1985) (a) This invitation for bids is issued to initiate...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-24
... current National Best Bid and National Best Offer, or if no National Best Bid or National Best Offer, at... the System to the Designated Percentage away from the then current National Best Bid and National Best Offer, or, if no National Best Bid or National Best Offer, to the Designated Percentage away from the...
NASA Astrophysics Data System (ADS)
Wang, Jinjun; Chen, Tongsheng; Xing, Da; Wang, Fang
2005-01-01
Caspase8 is activated and cleaves Bid into two fragments when cells are exposed to death-inducing molecules such as tumor necrosis factor-α (TNF-α). Then the C-terminal fragment relocates from cytosol to mitochondria and promotes the release of cytochrome c, in the final cellular apoptosis is induced. Despite recent progress in the study of Bid during apoptosis induction, it remains unclear how C-terminal fragment of Bid cleaved moves to mitochondria and then induces the release of cytochrome c and so on. The 14-3-3 proteins are known to sequester certain pro-apoptotic members of Bcl-2 family. In order to further study the biological action of Bid during apoptosis, especially under physiological condition of living cell, the plasmids pBid-CFP and pYFP-14-3-3 were constructed. By the transient transfection of pBid-CFP and pYFP-14-3-3, the dynamic process of interaction of Bid and 14-3-3 protein in individual living cell during the apoptosis was primarily investigated with FRET (fluorescent resonance energy transfer) technique by the use of fluorescence microscopy.
The effect of business improvement districts on the incidence of violent crimes
Golinelli, Daniela; Stokes, Robert J; Bluthenthal, Ricky
2010-01-01
Objective To examine whether business improvement districts (BID) contributed to greater than expected declines in the incidence of violent crimes in affected neighbourhoods. Method A Bayesian hierarchical model was used to assess the changes in the incidence of violent crimes between 1994 and 2005 and the implementation of 30 BID in Los Angeles neighbourhoods. Results The implementation of BID was associated with a 12% reduction in the incidence of robbery (95% posterior probability interval −2 to 24) and an 8% reduction in the total incidence of violent crimes (95% posterior probability interval −5 to 21). The strength of the effect of BID on robbery crimes varied by location. Conclusion These findings indicate that the implementation of BID can reduce the incidence of violent crimes likely to result in injury to individuals. The findings also indicate that the establishment of a BID by itself is not a panacea, and highlight the importance of targeting BID efforts to crime prevention interventions that reduce violence exposure associated with criminal behaviours. PMID:20587814
The effect of business improvement districts on the incidence of violent crimes.
MacDonald, John; Golinelli, Daniela; Stokes, Robert J; Bluthenthal, Ricky
2010-10-01
To examine whether business improvement districts (BID) contributed to greater than expected declines in the incidence of violent crimes in affected neighbourhoods. A Bayesian hierarchical model was used to assess the changes in the incidence of violent crimes between 1994 and 2005 and the implementation of 30 BID in Los Angeles neighbourhoods. The implementation of BID was associated with a 12% reduction in the incidence of robbery (95% posterior probability interval -2 to 24) and an 8% reduction in the total incidence of violent crimes (95% posterior probability interval -5 to 21). The strength of the effect of BID on robbery crimes varied by location. These findings indicate that the implementation of BID can reduce the incidence of violent crimes likely to result in injury to individuals. The findings also indicate that the establishment of a BID by itself is not a panacea, and highlight the importance of targeting BID efforts to crime prevention interventions that reduce violence exposure associated with criminal behaviours.
Bidding process in online auctions and winning strategy: Rate equation approach
NASA Astrophysics Data System (ADS)
Yang, I.; Kahng, B.
2006-06-01
Online auctions have expanded rapidly over the last decade and have become a fascinating new type of business or commercial transaction in this digital era. Here we introduce a master equation for the bidding process that takes place in online auctions. We find that the number of distinct bidders who bid k times up to the t th bidding progresses, called the k -frequent bidder, seems to scale as nk(t)˜tk-2.4 . The successfully transmitted bidding rate by the k -frequent bidder is likely to scale as qk(t)˜k-1.4 , independent of t for large t . This theoretical prediction is close to empirical data. These results imply that bidding at the last moment is a rational and effective strategy to win in an eBay auction.
Role of 2',6'-dimethyl-l-tyrosine (Dmt) in some opioid lead compounds.
Balboni, Gianfranco; Marzola, Erika; Sasaki, Yusuke; Ambo, Akihiro; Marczak, Ewa D; Lazarus, Lawrence H; Salvadori, Severo
2010-08-15
Here we evaluated how the interchange of the amino acids 2',6'-dimethyl-L-tyrosine (Dmt), 2',6'-difluoro-L-tyrosine (Dft), and tyrosine in position 1 can affect the pharmacological characterization of some reference opioid peptides and pseudopeptides. Generally, Dft and Tyr provide analogues with a similar pharmacological profile, despite different pK(a) values. Dmt/Tyr(Dft) replacement gives activity changes depending on the reference opioid in which the modification was made. Whereas, H-Dmt-Tic-Asp *-Bid is a potent and selective delta agonist (MVD, IC(50)=0.12nM); H-Dft-Tic-Asp *-Bid and H-Tyr-Tic-Asp *-Bid are potent and selective delta antagonists (pA(2)=8.95 and 8.85, respectively). When these amino acids are employed in the synthesis of deltorphin B and its Dmt(1) and Dft(1) analogues, the three compounds maintain a very similar delta agonism (MVD, IC(50) 0.32-0.53 nM) with a decrease in selectivity relative to the Dmt(1) analogue. In the less selective H-Dmt-Tic-Gly *-Bid the replacement of Dmt with Dft and Tyr retains the delta agonism but with a decrease in potency. Antagonists containing the Dmt-Tic pharmacophore do not support the exchange of Dmt with Dft or Tyr. Copyright 2010 Elsevier Ltd. All rights reserved.
Kinsella, Sinéad; Fichtner, Michael; Watters, Orla; König, Hans-Georg; Prehn, Jochen H M
2018-05-02
Chronic pro-inflammatory signaling propagates damage to neural tissue and affects the rate of disease progression. Increased activation of Toll-like receptors (TLRs), master regulators of the innate immune response, is implicated in the etiology of several neuropathologies including amyotrophic lateral sclerosis, Alzheimer's disease, and Parkinson's disease. Previously, we identified that the Bcl-2 family protein BH3-interacting domain death agonist (Bid) potentiates the TLR4-NF-κB pro-inflammatory response in glia, and specifically characterized an interaction between Bid and TNF receptor associated factor 6 (TRAF6) in microglia in response to TLR4 activation. We assessed the activation of mitogen-activated protein kinase (MAPK) and interferon regulatory factor 3 (IRF3) inflammatory pathways in response to TLR3 and TLR4 agonists in wild-type (wt) and bid-deficient microglia and macrophages, using Western blot and qPCR, focusing on the response of the E3 ubiquitin ligases Pellino 1 (Peli1) and TRAF3 in the absence of microglial and astrocytic Bid. Additionally, by Western blot, we investigated the Bid-dependent turnover of Peli1 and TRAF3 in wt and bid -/- microglia using the proteasome inhibitor Bortezomib. Interactions between the de-ubiquitinating Smad6-A20 and the E3 ubiquitin ligases, TRAF3 and TRAF6, were determined by FLAG pull-down in TRAF6-FLAG or Smad6-FLAG overexpressing wt and bid-deficient mixed glia. We elucidated a positive role of Bid in both TIR-domain-containing adapter-inducing interferon-β (TRIF)- and myeloid differentiation primary response 88 (MyD88)-dependent pathways downstream of TLR4, concurrently implicating TLR3-induced inflammation. We identified that Peli1 mRNA levels were significantly reduced in PolyI:C- and lipopolysaccharide (LPS)-stimulated bid-deficient microglia, suggesting disturbed IRF3 activation. Differential regulation of TRAF3 and Peli1, both essential E3 ubiquitin ligases facilitating TRIF-dependent signaling, was observed between wt and bid -/- microglia and astrocytes. bid deficiency resulted in increased A20-E3 ubiquitin ligase protein interactions in glia, specifically A20-TRAF6 and A20-TRAF3, implicating enhanced de-ubiquitination as the mechanism of action by which E3 ligase activity is perturbed. Furthermore, Smad6-facilitated recruitment of the de-ubiquitinase A20 to E3-ligases occurred in a bid-dependent manner. This study demonstrates that Bid promotes E3 ubiquitin ligase-mediated signaling downstream of TLR3 and TLR4 and provides further evidence for the potential of Bid inhibition as a therapeutic for the attenuation of the robust pro-inflammatory response culminating in TLR activation.
A comparison of pay-as-bid and marginal pricing in electricity markets
NASA Astrophysics Data System (ADS)
Ren, Yongjun
This thesis investigates the behaviour of electricity markets under marginal and pay-as-bid pricing. Marginal pricing is believed to yield the maximum social welfare and is currently implemented by most electricity markets. However, in view of recent electricity market failures, pay-as-bid has been extensively discussed as a possible alternative to marginal pricing. In this research, marginal and pay-as-bid pricing have been analyzed in electricity markets with both perfect and imperfect competition. The perfect competition case is studied under both exact and uncertain system marginal cost prediction. The comparison of the two pricing methods is conducted through two steps: (i) identify the best offer strategy of the generating companies (gencos); (ii) analyze the market performance under these optimum genco strategies. The analysis results together with numerical simulations show that pay-as-bid and marginal pricing are equivalent in a perfect market with exact system marginal cost prediction. In perfect markets with uncertain demand prediction, the two pricing methods are also equivalent but in an expected value sense. If we compare from the perspective of second order statistics, all market performance measures exhibit much lower values under pay-as-bid than under marginal pricing. The risk of deviating from the mean is therefore much higher under marginal pricing than under pay-as-bid. In an imperfect competition market with exact demand prediction, the research shows that pay-as-bid pricing yields lower consumer payments and lower genco profits. This research provides quantitative evidence that challenges some common claims about pay-as-bid pricing. One is that under pay-as-bid, participants would soon learn how to offer so as to obtain the same or higher profits than what they would have obtained under marginal pricing. This research however shows that, under pay-as-bid, participants can at best earn the same profit or expected profit as under marginal pricing. A second common claim refuted by this research is that pay-as-bid does not provide correct price signals if there is a scarcity of generation resources. We show that pay-as-bid does provide a price signal with such characteristics and furthermore argue that the price signal under marginal pricing with gaming may not necessarily be correct since it would then not reflect a lack of generation capacity but a desire to increase profit.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hu, Bao-guang; Department of Gastrointestinal Surgery, the Affiliated Hospital of Binzhou Medical University, Binzhou, Shandong; Liu, Li-ping
SNPs in human AFP promoter are associated with serum AFP levels in hepatocellular carcinoma (HCC), suggesting that AFP promoter variants may generate better transcriptional activities while retaining high specificity to AFP-producing cells. We sequenced human AFP promoters, cloned 15 different genotype promoters and tested their reporter activities in AFP-producing and non-producing cells. Among various AFP variant fragments tested, EA4D exhibited the highest reporter activity and thus was selected for the further study. EA4D was fused with tBid and coupled with nano-particle vector (H1) to form pGL3-EA4D-tBid/H1. pGL3-EA4D-tBid/H1 could express a high level of tBid while retain the specificity to AFP-producingmore » cells. In a HCC tumor model, application of pGL3-EA4D-tBid/H1 significantly inhibited the growth of AFP-producing-implanted tumors with minimal side-effects, but had no effect on non-AFP-producing tumors. Furthermore, pGL3-EA4D-tBid/H1 could significantly sensitize HCC cells to sorafenib, an approved anti-HCC agent. Collectively, pGL3-EA4D-tBid/H1, a construct with the AFP promoter EA4D and the novel H1 delivery system, can specifically target and effectively suppress the AFP-producing HCC. This new therapeutic tool shows little toxicity in vitro and in vivo and it should thus be safe for further clinical tests. - Highlights: • The nano-particle vector H1 has advantages in mediating gene therapy construct pGL3-EA4D-tBid for HCC treatment. • pGL3-EA4D-tBid/H1, a construct with the AFP promoter EA4D, can specifically target the AFP-producing HCC. • pGL3-EA4D-tBid/H1effectively suppresses the proliferation and growth of AFP-producing HCC. • This novel pGL3-EA4D-tBid/H1 therapeutic tool shows little toxicity in vitro and in vivo.« less
Raskin, P; Lewin, A; Reinhardt, R; Lyness, W
2009-09-01
To assess the use of a new repaglinide/metformin fixed-dose combination (FDC) tablet for the treatment of type 2 diabetes. In this 26-week, multicentre, open-label, parallel-group trial, subjects poorly controlled with mono- or dual-oral antidiabetic therapy were randomized 1 : 1 : 1 to receive a repaglinide/metformin FDC tablet either two times daily (BID) or three times daily (TID) or a rosiglitazone/metformin FDC tablet BID. The primary objective comprised two hypotheses tested in a hierarchical order: (i) that treatment with the repaglinide/metformin FDC BID is non-inferior to that of a rosiglitazone/metformin FDC tablet BID as measured by changes in haemoglobin A1c (HbA1c) (results presented here) and (ii) if true, that treatment with the repaglinide/metformin FDC BID was non-inferior to that of the repaglinide/metformin FDC TID as measured by changes in HbA1c (results presented in a companion paper). Additional efficacy and safety end-points were also assessed. Of the 561 subjects randomized, 383 completed the study. Reductions in HbA1c values became apparent at earlier times for repaglinide/metformin FDC BID treatment than rosiglitazone/metformin FDC BID, and final changes in HbA1c were not significantly different between treatment arms (p = 0.8186); thus, the predefined statistical criterion for non-inferiority was met. Overall adverse event profiles were comparable between treatment groups, and no major hypoglycaemic episodes were reported during the study. The repaglinide/metformin FDC BID regimen showed efficacy that was non-inferior to that of the rosiglitazone/metformin FDC BID regimen currently in clinical use and a more rapid reduction of HbA1c values. Thus, repaglinide/metformin FDC BID is a clinically feasible alternative to rosiglitazone/metformin FDC BID.
47 CFR 22.228 - Cellular rural service area licenses subject to competitive bidding.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Licensing Requirements and Procedures Competitive Bidding... initial applications for Cellular Rural Service Area licenses are subject to competitive bidding. The...
Materiel Acquisition Management Guide
1980-02-11
Ii-n manager and his staff, hiqhlighted by the specific de - tails provided in tabbea one-sheet descriptions. • Part III - Areas of Aco-uisition...support program requirements? Support and Test Equipment (S/TE)? Spares Support (SS)? Storage and transportation ? training? o Have test and...PACKAGES PROCUREMENT PLANNING/ PROCUREMENT pLANS TEST AND EVALUATION - PLANNING PRODUCIBILITY ENGINEERING AND TRAINING PLANNING (PEP) TRANSPORTABILITY
Human islet cells are killed by BID-independent mechanisms in response to FAS ligand.
Joglekar, Mugdha V; Trivedi, Prerak M; Kay, Thomas W; Hawthorne, Wayne J; O'Connell, Philip J; Jenkins, Alicia J; Hardikar, Anandwardhan A; Thomas, Helen E
2016-04-01
Cell death via FAS/CD95 can occur either by activation of caspases alone (extrinsic) or by activation of mitochondrial death signalling (intrinsic) depending on the cell type. The BH3-only protein BID is activated in the BCL-2-regulated or mitochondrial apoptosis pathway and acts as a switch between the extrinsic and intrinsic cell death pathways. We have previously demonstrated that islets from BID-deficient mice are protected from FAS ligand-mediated apoptosis in vitro. However, it is not yet known if BID plays a similar role in human beta cell death. We therefore aimed to test the role of BID in human islet cell apoptosis immediately after isolation from human cadaver donors, as well as after de-differentiation in vitro. Freshly isolated human islets or 10-12 day cultured human islet cells exhibited BID transcript knockdown after BID siRNA transfection, however they were not protected from FAS ligand-mediated cell death in vitro as determined by DNA fragmentation analysis using flow cytometry. On the other hand, the same cells transfected with siRNA for FAS-associated via death domain (FADD), a molecule in the extrinsic cell death pathway upstream of BID, showed significant reduction in cell death. De-differentiated islets (human islet-derived progenitor cells) also demonstrated similar results with no difference in cell death after BID knockdown as compared to scramble siRNA transfections. Our results indicate that BID-independent pathways are responsible for FAS-dependent human islet cell death. These results are different from those observed in mouse islets and therefore demonstrate potentially alternate pathways of FAS ligand-induced cell death in human and mouse islet cells.
Medical device procurement in low- and middle-income settings: protocol for a systematic review.
Diaconu, Karin; Chen, Yen-Fu; Manaseki-Holland, Semira; Cummins, Carole; Lilford, Richard
2014-10-21
Medical device procurement processes for low- and middle-income countries (LMICs) are a poorly understood and researched topic. To support LMIC policy formulation in this area, international public health organizations and research institutions issue a large body of predominantly grey literature including guidelines, manuals and recommendations. We propose to undertake a systematic review to identify and explore the medical device procurement methodologies suggested within this and further literature. Procurement facilitators and barriers will be identified, and methodologies for medical device prioritization under resource constraints will be discussed. Searches of both bibliographic and grey literature will be conducted to identify documents relating to the procurement of medical devices in LMICs. Data will be extracted according to protocol on a number of pre-specified issues and variables. First, data relating to the specific settings described within the literature will be noted. Second, information relating to medical device procurement methodologies will be extracted, including prioritization of procurement under resource constraints, the use of evidence (e.g. cost-effectiveness evaluations, burden of disease data) as well as stakeholders participating in procurement processes. Information relating to prioritization methodologies will be extracted in the form of quotes or keywords, and analysis will include qualitative meta-summary. Narrative synthesis will be employed to analyse data otherwise extracted. The PRISMA guidelines for reporting will be followed. The current review will identify recommended medical device procurement methodologies for LMICs. Prioritization methods for medical device acquisition will be explored. Relevant stakeholders, facilitators and barriers will be discussed. The review is aimed at both LMIC decision makers and the international research community and hopes to offer a first holistic conceptualization of this topic.
Medical device procurement in low- and middle-income settings: protocol for a systematic review
2014-01-01
Background Medical device procurement processes for low- and middle-income countries (LMICs) are a poorly understood and researched topic. To support LMIC policy formulation in this area, international public health organizations and research institutions issue a large body of predominantly grey literature including guidelines, manuals and recommendations. We propose to undertake a systematic review to identify and explore the medical device procurement methodologies suggested within this and further literature. Procurement facilitators and barriers will be identified, and methodologies for medical device prioritization under resource constraints will be discussed. Methods/design Searches of both bibliographic and grey literature will be conducted to identify documents relating to the procurement of medical devices in LMICs. Data will be extracted according to protocol on a number of pre-specified issues and variables. First, data relating to the specific settings described within the literature will be noted. Second, information relating to medical device procurement methodologies will be extracted, including prioritization of procurement under resource constraints, the use of evidence (e.g. cost-effectiveness evaluations, burden of disease data) as well as stakeholders participating in procurement processes. Information relating to prioritization methodologies will be extracted in the form of quotes or keywords, and analysis will include qualitative meta-summary. Narrative synthesis will be employed to analyse data otherwise extracted. The PRISMA guidelines for reporting will be followed. Discussion The current review will identify recommended medical device procurement methodologies for LMICs. Prioritization methods for medical device acquisition will be explored. Relevant stakeholders, facilitators and barriers will be discussed. The review is aimed at both LMIC decision makers and the international research community and hopes to offer a first holistic conceptualization of this topic. PMID:25336161
Code of Federal Regulations, 2010 CFR
2010-07-01
... solicited and selected if the Director issues a Request for Bids? 18.7 Section 18.7 Parks, Forests, and... § 18.7 How are lease proposals solicited and selected if the Director issues a Request for Bids? (a) If the amount of the rent is the only criterion for award of a lease, the Director may solicit bids...
ERIC Educational Resources Information Center
Black, Sally; Washington, Ericka
2008-01-01
The Olweus Bullying Prevention Program (BPP) is an internationally recognized school-based bullying prevention program. This project sought to evaluate pilot implementation of the program in one urban district using fidelity of implementation, bullying incident density (BID), student surveys, and serious incident reports as process and outcome…
A Robust Open Ascending-price Multi-unit Auction Protocol against False-name Bids
NASA Astrophysics Data System (ADS)
Iwasaki, Atsushi; Yokoo, Makoto; Terada, Kenji
This paper develops a new ascending-price multi-unit auction protocol that has following characteristics: (i) it has an open format, (ii) sincere bidding is an equilibrium strategy even if the marginal utilities of each agent can increase and agents can submit false-name bids. False-name bids are bids submitted under fictitious names such as multiple e-mail addresses, which can be done easily in the Internet. This is the first protocol that has these two characteristics. We show that our new protocol outperforms an existing protocol, which satisfies (ii), with respect to the social surplus and the seller's revenue.
Valenzuela, F; Paul, C; Mallbris, L; Tan, H; Papacharalambous, J; Valdez, H; Mamolo, C
2016-10-01
Tofacitinib is an oral Janus kinase inhibitor that is being investigated for psoriasis. Psoriasis impacts on physical and psychological well-being; improvements in health-related quality of life (HRQoL) with etanercept in psoriasis are well documented. To evaluate HRQoL with tofacitinib, vs. placebo or etanercept, in the Phase 3, randomized, placebo-controlled, non-inferiority, Oral-treatment Psoriasis Trial (OPT) Compare Study (NCT01241591). Adults with moderate to severe chronic plaque psoriasis were randomized 3:3:3:1 to tofacitinib 10 or 5 mg twice daily (BID), etanercept 50 mg twice weekly or placebo, for 12 weeks. Patient-reported outcomes (PROs) included Dermatology Life Quality Index (DLQI), Itch Severity Item and Patient Global Assessment of psoriasis. At baseline, 83.4% (911/1092) of patients had a DLQI score ranging between 6 and 30, indicating a substantial burden of disease. By Week 12, 47.3%, 43.6% and 30.9% of patients in the tofacitinib 10 mg BID, etanercept and tofacitinib 5 mg BID groups, respectively, had a DLQI score of 0 or 1 (no effect of psoriasis on QoL) vs. 7.8% for placebo (all P < 0.0001). Tofacitinib significantly reduced itch vs. placebo (P < 0.05 both doses) and etanercept (P < 0.0001 both doses) within 1 day of starting treatment. Furthermore, reductions in itch were greater with tofacitinib 10 mg BID, vs. etanercept, at Weeks 2-12 (all time points P < 0.05). At Week 2, an Itch Severity Item score of 'little or no itch' was more frequent with tofacitinib 10 mg (68.6%) vs. etanercept (57.4%) and placebo (12.2%), and the PtGA response rate was significantly greater with tofacitinib 10 mg vs. placebo (P < 0.05). Oral tofacitinib provided significant improvements across multiple PROs by Week 12. Improvements with tofacitinib 10 mg BID were comparable to etanercept, and improvements in itch were greater and more rapid with tofacitinib 10 mg BID. © 2016 The Authors. Journal of the European Academy of Dermatology and Venereology published by John Wiley & Sons Ltd on behalf of European Academy of Dermatology and Venereology.
Alternative contracting research : [project summary].
DOT National Transportation Integrated Search
2016-09-01
To conserve taxpayer money, many governmental agencies use a low-bid process for design : and construction services. The Florida Department of Transportations (FDOT) Design-Bid-Build : process falls in this category. However, a low-bid approach do...
Auer, Tibor; Churchill, Nathan W.; Flandin, Guillaume; Guntupalli, J. Swaroop; Raffelt, David; Quirion, Pierre-Olivier; Smith, Robert E.; Strother, Stephen C.; Varoquaux, Gaël
2017-01-01
The rate of progress in human neurosciences is limited by the inability to easily apply a wide range of analysis methods to the plethora of different datasets acquired in labs around the world. In this work, we introduce a framework for creating, testing, versioning and archiving portable applications for analyzing neuroimaging data organized and described in compliance with the Brain Imaging Data Structure (BIDS). The portability of these applications (BIDS Apps) is achieved by using container technologies that encapsulate all binary and other dependencies in one convenient package. BIDS Apps run on all three major operating systems with no need for complex setup and configuration and thanks to the comprehensiveness of the BIDS standard they require little manual user input. Previous containerized data processing solutions were limited to single user environments and not compatible with most multi-tenant High Performance Computing systems. BIDS Apps overcome this limitation by taking advantage of the Singularity container technology. As a proof of concept, this work is accompanied by 22 ready to use BIDS Apps, packaging a diverse set of commonly used neuroimaging algorithms. PMID:28278228
Experience of public procurement of Open Compute servers
NASA Astrophysics Data System (ADS)
Bärring, Olof; Guerri, Marco; Bonfillou, Eric; Valsan, Liviu; Grigore, Alexandru; Dore, Vincent; Gentit, Alain; Clement, Benoît; Grossir, Anthony
2015-12-01
The Open Compute Project. OCP (http://www.opencompute.org/). was launched by Facebook in 2011 with the objective of building efficient computing infrastructures at the lowest possible cost. The technologies are released as open hardware. with the goal to develop servers and data centres following the model traditionally associated with open source software projects. In 2013 CERN acquired a few OCP servers in order to compare performance and power consumption with standard hardware. The conclusions were that there are sufficient savings to motivate an attempt to procure a large scale installation. One objective is to evaluate if the OCP market is sufficiently mature and broad enough to meet the constraints of a public procurement. This paper summarizes this procurement. which started in September 2014 and involved the Request for information (RFI) to qualify bidders and Request for Tender (RFT).
41 CFR 102-38.225 - What are the additional requirements in the bid process?
Code of Federal Regulations, 2010 CFR
2010-07-01
... bid process? All sales except fixed price sales must contain a certification of independent price... matter to the Department of Justice or your agency's Office of the Inspector General. Bid Deposits ...
48 CFR 14.304 - Submission, modification, and withdrawal of bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... transmitted bid, the data received must not be viewed and, where practicable, must be purged from primary and backup data storage systems. (f) The contracting officer must promptly notify any bidder if its bid...
48 CFR 14.304 - Submission, modification, and withdrawal of bids.
Code of Federal Regulations, 2014 CFR
2014-10-01
... transmitted bid, the data received must not be viewed and, where practicable, must be purged from primary and backup data storage systems. (f) The contracting officer must promptly notify any bidder if its bid...
48 CFR 14.303 - Modification or withdrawal of bids.
Code of Federal Regulations, 2013 CFR
2013-10-01
... for the bid. (c) Upon withdrawal of an electronically transmitted bid, the data received shall not be viewed and shall be purged from primary and backup data storage systems. [48 FR 42171, Sept. 19, 1983, as...
48 CFR 14.303 - Modification or withdrawal of bids.
Code of Federal Regulations, 2012 CFR
2012-10-01
... for the bid. (c) Upon withdrawal of an electronically transmitted bid, the data received shall not be viewed and shall be purged from primary and backup data storage systems. [48 FR 42171, Sept. 19, 1983, as...
48 CFR 14.304 - Submission, modification, and withdrawal of bids.
Code of Federal Regulations, 2011 CFR
2011-10-01
... transmitted bid, the data received must not be viewed and, where practicable, must be purged from primary and backup data storage systems. (f) The contracting officer must promptly notify any bidder if its bid...
48 CFR 14.304 - Submission, modification, and withdrawal of bids.
Code of Federal Regulations, 2013 CFR
2013-10-01
... transmitted bid, the data received must not be viewed and, where practicable, must be purged from primary and backup data storage systems. (f) The contracting officer must promptly notify any bidder if its bid...
48 CFR 14.304 - Submission, modification, and withdrawal of bids.
Code of Federal Regulations, 2012 CFR
2012-10-01
... transmitted bid, the data received must not be viewed and, where practicable, must be purged from primary and backup data storage systems. (f) The contracting officer must promptly notify any bidder if its bid...
48 CFR 14.303 - Modification or withdrawal of bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for the bid. (c) Upon withdrawal of an electronically transmitted bid, the data received shall not be viewed and shall be purged from primary and backup data storage systems. [48 FR 42171, Sept. 19, 1983, as...
48 CFR 14.303 - Modification or withdrawal of bids.
Code of Federal Regulations, 2014 CFR
2014-10-01
... for the bid. (c) Upon withdrawal of an electronically transmitted bid, the data received shall not be viewed and shall be purged from primary and backup data storage systems. [48 FR 42171, Sept. 19, 1983, as...
48 CFR 14.303 - Modification or withdrawal of bids.
Code of Federal Regulations, 2011 CFR
2011-10-01
... for the bid. (c) Upon withdrawal of an electronically transmitted bid, the data received shall not be viewed and shall be purged from primary and backup data storage systems. [48 FR 42171, Sept. 19, 1983, as...
Advertising and Sealed Bid Auctions in a Transshipment Game
1996-06-01
distributors promote their sales by advertising . While the maximum quantity demanded by each customer is fixed and given, his bids on the various...brands are determined by the advertising and other promotional efforts. The bid response function for each consumer is supposed to be given and known. The...the optimal distribution of the product, and the bids of the consumers . A numerical example is provided and the solution routine is discussed.
Smarter than others? Conjectures in lowest unique bid auctions.
Zhou, Cancan; Dong, Hongguang; Hu, Rui; Chen, Qinghua
2015-01-01
Research concerning various types of auctions, such as English auctions, Dutch auctions, highest-price sealed-bid auctions, and second-price sealed-bid auctions, is always a topic of considerable interest in interdisciplinary fields. The type of auction, known as a lowest unique bid auction (LUBA), has also attracted significant attention. Various models have been proposed, but they often fail to explain satisfactorily the real bid-distribution characteristics. This paper discusses LUBA bid-distribution characteristics, including the inverted-J shape and the exponential decrease in the upper region. The authors note that this type of distribution, which initially increases and later decreases, cannot be derived from the symmetric Nash equilibrium framework based on perfect information that has previously been used. A novel optimization model based on non-perfect information is presented. The kernel of this model is the premise that agents make decisions to achieve maximum profit based on imaginary information or assumptions regarding the behavior of others.
Evaluating Software Assurance Knowledge and Competency of Acquisition Professionals
2014-10-01
of ISO 12207 -2008, both internationally and in the United States [7]. That standard documents a comprehensive set of activities and supporting...grows, organizations must ensure that their procurement agents acquire high quality, secure software. ISO 12207 and the Software Assurance Competency...cyberattacks grows, organizations must ensure that their procurement agents acquire high quality, secure software. ISO 12207 and the Software Assurance
Evaluation of Ammunition Data Cards (REDACTED)
2016-04-29
Procuring Contracting Officer ( PCO ), the manufacturer shall include, in the components sections on ADC representing the munition, all assemblies...lot components or evidence of PCO waiver approval. As a result, ADCs did not consistently include component items that make up the ammunition, and...Energetics PCO Procuring Contract Officer PQM Product Quality Manager QALI Quality Assurance Letter of Instruction QAR Quality Assurance Representative
Open system environment procurement
NASA Technical Reports Server (NTRS)
Fisher, Gary
1994-01-01
Relationships between the request for procurement (RFP) process and open system environment (OSE) standards are described. A guide was prepared to help Federal agency personnel overcome problems in writing an adequate statement of work and developing realistic evaluation criteria when transitioning to an OSE. The guide contains appropriate decision points and transition strategies for developing applications that are affordable, scalable and interoperable across a broad range of computing environments. While useful, the guide does not eliminate the requirement that agencies posses in-depth expertise in software development, communications, and database technology in order to evaluate open systems.
Minimizing forced outage risk in generator bidding
NASA Astrophysics Data System (ADS)
Das, Dibyendu
Competition in power markets has exposed the participating companies to physical and financial uncertainties. Generator companies bid to supply power in a day-ahead market. Once their bids are accepted by the ISO they are bound to supply power. A random outage after acceptance of bids forces a generator to buy power from the expensive real-time hourly spot market and sell to the ISO at the set day-ahead market clearing price, incurring losses. A risk management technique is developed to assess this financial risk associated with forced outages of generators and then minimize it. This work presents a risk assessment module which measures the financial risk of generators bidding in an open market for different bidding scenarios. The day-ahead power market auction is modeled using a Unit Commitment algorithm and a combination of Normal and Cauchy distributions generate the real time hourly spot market. Risk profiles are derived and VaRs are calculated at 98 percent confidence level as a measure of financial risk. Risk Profiles and VaRs help the generators to analyze the forced outage risk and different factors affecting it. The VaRs and the estimated total earning for different bidding scenarios are used to develop a risk minimization module. This module will develop a bidding strategy of the generator company such that its estimated total earning is maximized keeping the VaR below a tolerable limit. This general framework of a risk management technique for the generating companies bidding in competitive day-ahead market can also help them in decisions related to building new generators.
Hybrid promoters directed tBid gene expression to breast cancer cells by transcriptional targeting.
Farokhimanesh, Samila; Rahbarizadeh, Fatemeh; Rasaee, Mohammad J; Kamali, Abbas; Mashkani, Baratali
2010-01-01
Developing cancer gene therapy constructs based on transcriptional targeting of genes to cancer cells is a new and promising modality for treatment of cancer. Introducing truncated Bid (tBid), a recently known member of the Bcl-2 family, eradicates cancer cells efficiently. For transcriptional targeting of tBid, two dual-specificity promoters, combining cancer specific core promoters and response modules, were designed. These two core promoter modules contained cancer specific promoters of MUC1 and Survivin genes accompanied by hypoxia-responsive elements and estrogen responsive elements (microenvironment condition of breast cancer cells) which were employed to achieve a higher and more specific level of tBid expression in breast cancer cells. Correlation of the level of tBid expression in normal and cancer cell lines with promoter activity was measured by RT-PCR after treatment with hypoxia and estrogen. The level of tBid expression under control of new hybrid promoters was compared with its expression under control of cytomegalovirus (CMV) promoter as a control. Our data revealed that the level of tBid expression in breast cancer cells were nearly 11 times more than normal cells because of the cancer specific promoters, although tBid expression under control of CMV promoter was almost the same in normal and cancer cell lines. Increased apoptosis was detected in the transfected breast cancer cell lines by the Caspase-3 activity assay. The application of these promoters may prove to have the advantage of tumor selective gene therapy in breast cancer cells and low-potential toxicity for normal tissues.
48 CFR 614.402-70 - Waiver of public opening of bids.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of public opening of bids. Overseas posts may request waiver of the public opening of bids if that activity is inconsistent with local law or legal practice, or with post security. For that purpose, the...
47 CFR 90.910 - Bidding credits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... cost of its winning bid on Spectrum Blocks A through V. A winning bidder that qualifies as a small... percent to lower the cost of its winning bid on Spectrum Blocks A through V. [68 FR 43001, July 21, 2003] ...
47 CFR 90.910 - Bidding credits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... cost of its winning bid on Spectrum Blocks A through V. A winning bidder that qualifies as a small... percent to lower the cost of its winning bid on Spectrum Blocks A through V. [68 FR 43001, July 21, 2003] ...
47 CFR 90.910 - Bidding credits.
Code of Federal Regulations, 2013 CFR
2013-10-01
... cost of its winning bid on Spectrum Blocks A through V. A winning bidder that qualifies as a small... percent to lower the cost of its winning bid on Spectrum Blocks A through V. [68 FR 43001, July 21, 2003] ...
47 CFR 90.910 - Bidding credits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... cost of its winning bid on Spectrum Blocks A through V. A winning bidder that qualifies as a small... percent to lower the cost of its winning bid on Spectrum Blocks A through V. [68 FR 43001, July 21, 2003] ...
24 CFR 891.535 - Requirements for awarding construction contracts.
Code of Federal Regulations, 2012 CFR
2012-04-01
... be an opportunity for minority owned and women owned businesses to be awarded a contract. (1) Bids... the right to reject any or all bids and to waive any informality. (3) The bid form, which must be...
Evaluation of fuel usage factors in highway construction in Oregon.
DOT National Transportation Integrated Search
2010-05-01
Prices for different construction materials change frequently. In recent years, the price for these different materials has dramatically increased. This result leads contractors to inflate the bid price for a construction project in order to cover th...
O'Neil, Patrick M; Smith, Steven R; Weissman, Neil J; Fidler, Meredith C; Sanchez, Matilde; Zhang, Jinkun; Raether, Brian; Anderson, Christen M; Shanahan, William R
2012-07-01
The BLOOM-DM (Behavioral Modification and Lorcaserin for Obesity and Overweight Management in Diabetes Mellitus) study evaluated efficacy and safety of lorcaserin for weight loss in patients with type 2 diabetes. Secondary objectives included evaluations of glycemic control, lipids, blood pressure, and quality of life. This 1-year, randomized, placebo-controlled trial enrolled 604 patients 1:1:1 to placebo, lorcaserin 10 mg once daily (QD) or lorcaserin 10 mg twice daily (BID). Patients were treated with metformin, a sulfonylurea (SFU) or both; had glycated hemoglobin (HbA(1c)) 7-10%; were 18-65 years old; and had BMI 27-45 kg/m(2). Patients received diet and exercise counseling. Safety monitoring included serial echocardiograms. Mean (± SD) age was 52.7 ± 8.7; 54.2% were women; 60.5% were white, 20.9% were African American, and 13.8% were Hispanic. Mean (± SD) weight was 103.6 ± 17.8 kg; BMI was 36.0 ± 4.5 kg/m(2). Most patients (91.7%) took metformin; 50.2% took a SFU. More patients lost ≥5% body weight with lorcaserin BID (37.5%; P < 0.001) or lorcaserin QD (44.7%; P < 0.001) vs. placebo (16.1%; modified intent to treat (MITT)/last observation carried forward (LOCF)). Least square mean (± SEM) weight change was -4.5 ± 0.35% with lorcaserin BID and -5.0 ± 0.5% with lorcaserin QD vs. -1.5 ± 0.36% with placebo (P < 0.001 for each). HbA(1c) decreased 0.9 ± 0.06 with lorcaserin BID, 1.0 ± 0.09 with lorcaserin QD, and 0.4 ± 0.06 with placebo (P < 0.001 for each); fasting glucose decreased 27.4 ± 2.5 mg/dl, -28.4 ± 3.8 mg/dl, and 11.9 ± 2.5 mg/dl, respectively (P < 0.001 for each). Symptomatic hypoglycemia occurred in 7.4% of patients on lorcaserin BID, 10.5% on lorcaserin QD, and 6.3% on placebo. Common adverse events were headache, back pain, nasopharyngitis, and nausea. Lorcaserin was associated with significant weight loss and improvement in glycemic control in patients with type 2 diabetes.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of public lands under this section shall be conducted under competitive bidding procedures... competitive bidding or without competitive bidding. In recognizing public policies, the Secretary shall give... considered in determining the method of sale. These factors include, but are not limited to: Competitive...
47 CFR 90.1021 - Definitions concerning competitive bidding process.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Definitions concerning competitive bidding process. 90.1021 Section 90.1021 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY... 220 MHz Service § 90.1021 Definitions concerning competitive bidding process. (a) Scope. The...
48 CFR 245.7304 - Informal bid procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Inventory 245.7304 Informal bid procedures. (a) Upon approval of the plant clearance officer, the contractor...— (1) Maximum practical competition is maintained; (2) Sources solicited are recorded; and (3) Informal... plant clearance officer prior to soliciting bids from other prospective bidders. ...
Ruane, Peter; Lang, Joseph; DeJesus, Edwin; Berger, Daniel S; Dretler, Robin; Rodriguez, Allan; Ward, Douglas J; Lim, Michael L; Liao, Qiming; Reddy, Sunila; Clair, Marty St; Vila, Tania; Shaefer, Mark S
2006-01-01
The purpose of this pilot study was to explore the efficacy and safety of the abacavir/lamivudine/zidovudine fixed-dose combination tablet administered as two tablets once daily (qd) versus one tablet twice daily (bid) in combination with efavirenz (EFV). This was a prospective, randomized, open-label, multicenter study with a 24-week treatment period in 7 outpatient HIV clinics in the United States. Patients currently receiving an initial regimen of abacavir/lamivudine/zidovudine bid plus EFV qd for at least 6 months with HIV-1 RNA <50 copies/mL for at least 3 months and a screening CD4+ cell count > or = 200 cells/mm3 were eligible. Thirty-six patients enrolled, and 35 (97%) completed the study. Participants were randomized to switch to 2 tablets of abacavir/lamivudine/zidovudine qd plus EFV qd (QD arm) or continue current treatment (BID arm) for 24 weeks. Efficacy, safety, and adherence were evaluated. Median baseline CD4+ cell count was 521 cells/mm3. At week 24, HIV-1 RNA <50 copies/mL was achieved for 94% of participants in the QD arm and 89% in the BID arm by intent-to-treat, missing = failure analysis (95% confidence interval for difference: > or = 0.29 to +0.18, p = 1.000). At week 24, median CD4+ cell count change from baseline was +26 cells/mm3 for the QD arm and -39 cells/mm3 for BID arm. One patient randomized to the QD arm met virologic failure criteria (confirmed HIV-1 RNA >120 copies/mL) at week 20 and viral genotype showed M184V. After failure, this patient revealed he never took EFV throughout the entire study after randomization, effectively receiving only abacavir/lamivudine/zidovudine qd alone. Median adherence was slightly higher in the QD arm, although both arms had broad variability and overlapping interquartile ranges. Adverse events were infrequent and occurred with similar frequency between arms; treatment-related adverse events were abdominal pain, flatulence, nausea, headache, and abnormal dreams (1 patient [3%] for each adverse event). No patients withdrew due to adverse events, and no abacavir hypersensitivity reactions were reported. In this pilot study of patients suppressed on abacavir/lamivudine/zidovudine bid plus EFV, 94% of participants switching to abacavir/lamivudine/zidovudine qd plus EFV maintained virologic suppression, compared to 89% of participants continuing abacavir/lamivudine/zidovudine bid plus EFV.
Optimal GENCO bidding strategy
NASA Astrophysics Data System (ADS)
Gao, Feng
Electricity industries worldwide are undergoing a period of profound upheaval. The conventional vertically integrated mechanism is being replaced by a competitive market environment. Generation companies have incentives to apply novel technologies to lower production costs, for example: Combined Cycle units. Economic dispatch with Combined Cycle units becomes a non-convex optimization problem, which is difficult if not impossible to solve by conventional methods. Several techniques are proposed here: Mixed Integer Linear Programming, a hybrid method, as well as Evolutionary Algorithms. Evolutionary Algorithms share a common mechanism, stochastic searching per generation. The stochastic property makes evolutionary algorithms robust and adaptive enough to solve a non-convex optimization problem. This research implements GA, EP, and PS algorithms for economic dispatch with Combined Cycle units, and makes a comparison with classical Mixed Integer Linear Programming. The electricity market equilibrium model not only helps Independent System Operator/Regulator analyze market performance and market power, but also provides Market Participants the ability to build optimal bidding strategies based on Microeconomics analysis. Supply Function Equilibrium (SFE) is attractive compared to traditional models. This research identifies a proper SFE model, which can be applied to a multiple period situation. The equilibrium condition using discrete time optimal control is then developed for fuel resource constraints. Finally, the research discusses the issues of multiple equilibria and mixed strategies, which are caused by the transmission network. Additionally, an advantage of the proposed model for merchant transmission planning is discussed. A market simulator is a valuable training and evaluation tool to assist sellers, buyers, and regulators to understand market performance and make better decisions. A traditional optimization model may not be enough to consider the distributed, large-scale, and complex energy market. This research compares the performance and searching paths of different artificial life techniques such as Genetic Algorithm (GA), Evolutionary Programming (EP), and Particle Swarm (PS), and look for a proper method to emulate Generation Companies' (GENCOs) bidding strategies. After deregulation, GENCOs face risk and uncertainty associated with the fast-changing market environment. A profit-based bidding decision support system is critical for GENCOs to keep a competitive position in the new environment. Most past research do not pay special attention to the piecewise staircase characteristic of generator offer curves. This research proposes an optimal bidding strategy based on Parametric Linear Programming. The proposed algorithm is able to handle actual piecewise staircase energy offer curves. The proposed method is then extended to incorporate incomplete information based on Decision Analysis. Finally, the author develops an optimal bidding tool (GenBidding) and applies it to the RTS96 test system.
Continuous Positive Airway Pressure Device Time to Procurement in a Disadvantaged Population.
DelRosso, Lourdes M; Hoque, Romy; Chesson, Andrew L
2015-01-01
Introduction. The management of obstructive sleep apnea (OSA) in patients who cannot afford a continuous positive airway pressure (CPAP) device is challenging. In this study we compare time to CPAP procurement in three groups of patients diagnosed with OSA: uninsured subsidized by a humanitarian grant (Group 1), uninsured unsubsidized (Group 2), and those with Medicare or Medicaid (Group 3). We evaluate follow-up and adherence in Group 1. We hypothesize that additional factors, rather than just the ability to obtain CPAP, may uniquely affect follow-up and adherence in uninsured patients. Methods. 30 patients were in Groups 1 and 2, respectively. 12 patients were in Group 3. Time of CPAP procurement from OSA diagnosis to CPAP initiation was assessed in all groups. CPAP adherence data was collected for Group 1 patients at 1, 3, 6, and 9 months. Results. There were no significant differences between groups in gender, age, body mass index, or apnea hypopnea index. The mean time to procurement in Group 1 was shorter compared to Group 2 but not significant. Compared to both Group 1 and Group 2, Group 3 patients had significantly shorter times to device procurement. Conclusion. Time to procurement of CPAP was significantly shorter in those with Medicaid/Medicare insurance compared to the uninsured.
de Lapertosa, Silvia Beatriz Gorban; Frechtel, Gustavo; Hardy, Elise; Sauque-Reyna, Leobardo
2016-12-01
Socioeconomic changes in Latin American countries have led to an increased prevalence of type 2 diabetes (T2D). We examined the effects of exenatide twice daily (BID) or insulin lispro, each added to insulin glargine, in Latin American patients with T2D. This was a subgroup analysis of patients from Argentina and Mexico in the 4B study (N=114). Patients with glycated hemoglobin (HbA1c) of 7.0-10.0% (53-86mmol/mol) after 12weeks of intensive basal insulin optimization were randomized to exenatide BID or thrice-daily insulin lispro added to insulin glargine and metformin. After 30weeks, addition of exenatide BID or insulin lispro resulted in significant (P<0.0001) reductions in HbA1c (exenatide BID: -0.9% [-10mmol/mol]; insulin lispro: -1.2% [-13mmol/mol]). Weight was stable in the exenatide BID group (-0.1kg) and increased significantly (+3.4kg; P<0.0001) with insulin lispro. Major and minor hypoglycemia occurred less frequently (40 vs. 253 events) with exenatide BID compared with insulin lispro. Gastrointestinal adverse events of nausea, diarrhea, and vomiting occurred more frequently with exenatide BID than with insulin lispro. Both exenatide BID and prandial insulin lispro, each added to basal insulin glargine, were effective at reducing HbA1c in Latin American patients. Treatment with exenatide BID resulted in stable weight but more gastrointestinal adverse events. Treatment with insulin lispro resulted in weight gain and an increased risk of hypoglycemia. These findings support the addition of exenatide BID to insulin glargine as an option for Latin American patients unable to achieve glycemic control on basal insulin alone. Copyright © 2016 The Authors. Published by Elsevier Ireland Ltd.. All rights reserved.
Driak, D; Dvorska, M; Bolehovska, P; Svandova, I; Novotny, J; Halaska, M
2014-01-01
The most common malignancies of the female genital tract are endometrial carcinomas, whose are generally proceeded by hyperplasia. The maintenance of tissue homeostasis is to great extent governed by apoptosis, whose defects can lead to the preneoplastic and/or cancerous changes. Endometrial apoptosis involves among others three groups of proteins of the Bcl-2 family. First group contains anti-apoptotic proteins (e. g. Bcl-2, Bcl-xL). The other two groups belong to the pro-apoptotic proteins with three (e. g. Bax, Bak) or one (e. g. Bad, Bid) so-called BH domains. Bad and Bid trigger the oligomerization of Bak and Bax protein, which permeabilize the outer mitochondrial wall. Unlike Bid, Bad cannot directly trigger apoptosis. Instead, Bad lowers the threshold at which apoptosis is induced, by binding anti-apoptotic Bcl-2 proteins. However, their mutual counterbalance or synergism in the human endometrium has not been reported yet.In this study, the levels of Bid and Bad were measured using SDS-PAGE and Western blotting with specific antibodies, with the aim to analyse expression of Bid and Bad proteins in normal (NE), hyperplastic (HE) and cancerous (CE) endometrium. We demonstrated that Bid expression in CE reached only 47% and 50% of this observed in NE and HE. Conversely, Bad expression in HE reached only 40% and 36% of this observed in NE and CE, respectively. We detected no significant changes of Bid expression between HE and NE, and levels of Bad protein were not different between CE and NE.Trend of Bid and Bad protein expression is clearly opposite in HE and CE. We hypothesise that disrupted apoptotic program in CE seems to be reduced further by lowering levels of direct apoptotic trigger protein Bid. We suggest that the adenocarcinoma tissue of human endometrium thus tries to strengthen its apoptotic effort by lowering the apoptotic threshold via higher Bad levels.
Jang, Mi Heui; Lee, Gyungjoo
2013-04-01
This study was done to examine not only the relationships between body mass index (BMI), self-esteem, body image dissatisfaction (BID) and mental health, according to gender, but the mediating role of BID on mental health in relation to BMI and self-esteem among early adolescents. Data from 576 (296 boys and 280 girls) elementary school students in grades 5 to 6 were collected. A multiple-group path analysis was utilized to examine the relationships between BMI, self-esteem, BID and mental health by gender. In the path analysis for all students, poor mental health was related directly to BID, while it was indirectly related to BMI and self-esteem. In the multiple-group path analysis of both genders, BID was found to have a significant direct and indirect effect on mental health for girls alone. The findings suggested that BID should be examined early to prevent poor mental health in early adolescent girls. This study helps to elucidate the role of early adolescent BID on mental health and provides insight for further prevention and intervention programs in school and community mental health settings.
Switch from type II to I Fas/CD95 death signaling upon in vitro culturing of primary hepatocytes
Walter, Dorothée; Schmich, Kathrin; Vogel, Sandra; Pick, Robert; Kaufmann, Thomas; Hochmuth, Florian Christoph; Haber, Angelika; Neubert, Karin; McNelly, Sabine; von Weizsäcker, Fritz; Merfort, Irmgard; Maurer, Ulrich; Strasser, Andreas; Borner, Christoph
2010-01-01
Fas/CD95-induced apoptosis of hepatocytes in vivo proceeds through the so-called type II pathway, requiring the pro-apoptotic BH3-only Bcl-2 family member Bid for mitochondrial death signaling. Consequently, Bid-deficient mice are protected from anti-Fas antibody injection induced fatal hepatitis. Here we report the unexpected finding that freshly isolated mouse hepatocytes, cultured on collagen or Matrigel™, become independent of Bid for Fas-induced apoptosis, thereby switching death signaling from type II to type I. In such in vitro cultures, FasL activates caspase-3 without Bid cleavage, Bax/Bak activation or cytochrome c release, and neither Bid ablation nor Bcl-2 overexpression is protective. The type II to type I switch depends on extracellular matrix adhesion, as primary hepatocytes in suspension die in a Bid-dependent manner. Moreover, the switch is specific for FasL-induced apoptosis as collagen-plated Bid-deficient hepatocytes are protected from TNFα/ActD-induced apoptosis. Conclusion Our data suggest a selective crosstalk between extracellular matrix and Fas-mediated signaling which favours mitochondria-independent type I apoptosis induction. PMID:19003879
Switch from type II to I Fas/CD95 death signaling on in vitro culturing of primary hepatocytes.
Walter, Dorothée; Schmich, Kathrin; Vogel, Sandra; Pick, Robert; Kaufmann, Thomas; Hochmuth, Florian Christoph; Haber, Angelika; Neubert, Karin; McNelly, Sabine; von Weizsäcker, Fritz; Merfort, Irmgard; Maurer, Ulrich; Strasser, Andreas; Borner, Christoph
2008-12-01
Fas/CD95-induced apoptosis of hepatocytes in vivo proceeds through the so-called type II pathway, requiring the proapoptotic BH3-only Bcl-2 family member Bid for mitochondrial death signaling. Consequently, Bid-deficient mice are protected from anti-Fas antibody injection induced fatal hepatitis. We report the unexpected finding that freshly isolated mouse hepatocytes, cultured on collagen or Matrigel, become independent of Bid for Fas-induced apoptosis, thereby switching death signaling from type II to type I. In such in vitro cultures, Fas ligand (FasL) activates caspase-3 without Bid cleavage, Bax/Bak activation or cytochrome c release, and neither Bid ablation nor Bcl-2 overexpression is protective. The type II to type I switch depends on extracellular matrix adhesion, as primary hepatocytes in suspension die in a Bid-dependent manner. Moreover, the switch is specific for FasL-induced apoptosis as collagen-plated Bid-deficient hepatocytes are protected from tumor necrosis factor alpha/actinomycin D (TNFalpha/ActD)-induced apoptosis. Our data suggest a selective crosstalk between extracellular matrix and Fas-mediated signaling that favors mitochondria-independent type I apoptosis induction.