Sample records for procurement construction test

  1. BIM-Based E-Procurement: An Innovative Approach to Construction E-Procurement

    PubMed Central

    2015-01-01

    This paper presents an innovative approach to e-procurement in construction, which uses building information models (BIM) to support the construction procurement process. The result is an integrated and electronic instrument connected to a rich knowledge base capable of advanced operations and able to strengthen transaction relationships and collaboration throughout the supply chain. The BIM-based e-procurement prototype has been developed using distinct existing electronic solutions and an IFC server and was tested in a pilot case study, which supported further discussions of the results of the research. PMID:26090518

  2. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  3. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  4. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  5. Long-Term Implications of the 2016 Future Years Defense Program

    DTIC Science & Technology

    2016-01-01

    operation and maintenance activities; acquisition includes research, development, test, and evaluation as well as procurement of weapon systems and other...group includes procurement and research, development, test, and evaluation (RDT&E). Appropriations for procurement fund the purchase of new weapon...and Evaluation Military Construction Family Housing OCO Funding Actual FYDP Period Beyond the FYDP PeriodDoD’s Estimates For 2017 through 2020 DoD

  6. Price vs. Performance: The Value of Next Generation Fighter Aircraft

    DTIC Science & Technology

    2007-03-01

    forms. Both the semi-log and log-log forms were plagued with heteroskedasticity (according to the Breusch - Pagan /Cook-Weisberg test ). The RDT&E models...from 1949-present were used to construct two models – one based on procurement costs and one based on research, design, test , and evaluation (RDT&E...fighter aircraft hedonic models include several different categories of variables. Aircraft procurement costs and research, design, test , and

  7. 13 CFR 305.6 - Allowable methods of procurement for construction services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may use alternate construction procurement methods to the traditional design/bid/build procedures... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Allowable methods of procurement...

  8. 13 CFR 125.2 - What are SBA's and the procuring agency's responsibilities when providing contracting assistance...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... justified); is for construction and seeks to package or consolidate discrete construction projects; or if a... alternatives may include: (A) Breaking up the procurement into smaller discrete procurements, especially construction acquisitions that can be procured as separate projects; (B) Breaking out one or more discrete...

  9. Building a Construction Procurement Negotiation Training Game Model: Learning Experiences and Outcomes

    ERIC Educational Resources Information Center

    Dzeng, Ren-Jye; Lin, Ken-Yu; Wang, Pei-Ru

    2014-01-01

    Game-based education is a promising method for encouraging student learning. Although learning construction procurement and negotiation require hands-on practice, in most construction management courses at the college level, this subject is taught by using lectures and case studies. In this study, a construction procurement and negotiation game…

  10. 13 CFR 305.6 - Allowable methods of procurement for construction services.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may... design/build, construction management at risk and force account. If an alternate method is used, the... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Allowable methods of procurement...

  11. Critical analysis of procurement techniques in construction management sectors

    NASA Astrophysics Data System (ADS)

    Tiwari, Suman Tiwari Suresh; Chan, Shiau Wei; Faraz Mubarak, Muhammad

    2018-04-01

    Over the last three decades, numerous procurement techniques have been one of the highlights of the Construction Management (CM) for ventures, administration contracting, venture management as well as design and construct. Due to the development and utilization of those techniques, various researchers have explored the criteria for their choice and their execution in terms of time, cost and quality. Nevertheless, there is a lack of giving an account on the relationship between the procurement techniques and the progressed related issues, for example, supply chain, sustainability, innovation and technology development, lean construction, constructability, value management, Building Information Modelling (BIM) as well as e-procurement. Through chosen papers from the reputable CM-related academic journals, the specified scopes of these issues are methodically assessed with the objective to explore the status and trend in procurement related research. The result of this paper contributes theoretically as well as practically to the researchers and industrialist in order to be aware and appreciate the development of procurement techniques.

  12. 40 CFR 35.936 - Procurement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.936 Procurement. (a) Sections 35.936 through 35.939 set forth policies and minimum standards for procurement of architectural or... under all steps of grants for construction of treatment works. Acquisition of real property shall be...

  13. QA program plan plutonium stabilization and handling project W-460

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, J.W.

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Audette, L.G.

    As originally conceived, the project called for modification of existing, commercially available stoker components. We experienced substantial delays in procurement, caused by supply backlogs and a major fire at the plant which ultimately provided the main stoker frame. Added to the problems was the bankruptcy of the L.W. Gay Stoveworks, where the project was to be located. Ultimately, parts were assembled and a combustion chamber was constructed at the Leyden Energy Corporation of Shelburne Falls, Massachusetts. A firing chamber with provision for measuring various physical and combustion parameters was constructed. The stoker, with appropriate modifications, was installed. Combustion analysis equipmentmore » was procured, and coal and wood pellets were stoked in order to test the effectiveness of the modifications. This report describes the configuration of the demonstration stoker and its modifications, as well as the testing exercise performed over the course of the project. 10 figs.« less

  15. 17 CFR 256.01-4 - Construction or service contracts, and centralized procurement accounting.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... expenses directly attributable to construction work shall be excluded from the accounting system of the... companies. Cost of goods procured shall be excluded from the accounting system of the service company and... contracts, and centralized procurement accounting. 256.01-4 Section 256.01-4 Commodity and Securities...

  16. 45 CFR 1309.52 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION Construction and Major Renovation § 1309.52 Procurement procedures. (a) All facility construction and major renovation transactions...

  17. 45 CFR 1309.52 - Procurement procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION Construction and Major Renovation § 1309.52 Procurement procedures. (a) All facility construction and major renovation transactions...

  18. 13 CFR 305.6 - Allowable methods of procurement for construction services.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... design/build, construction management at risk and force account. If an alternate method is used, the... for construction services. 305.6 Section 305.6 Business Credit and Assistance ECONOMIC DEVELOPMENT... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may...

  19. 13 CFR 305.6 - Allowable methods of procurement for construction services.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... design/build, construction management at risk and force account. If an alternate method is used, the... for construction services. 305.6 Section 305.6 Business Credit and Assistance ECONOMIC DEVELOPMENT... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may...

  20. 13 CFR 305.6 - Allowable methods of procurement for construction services.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... design/build, construction management at risk and force account. If an alternate method is used, the... for construction services. 305.6 Section 305.6 Business Credit and Assistance ECONOMIC DEVELOPMENT... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may...

  1. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  2. 10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...

  3. 10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...

  4. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  5. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 12 2013-01-01 2013-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  6. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 12 2014-01-01 2013-01-01 true Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  7. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  8. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  9. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  10. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  11. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  12. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  13. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  14. Green related practices for construction procurement

    NASA Astrophysics Data System (ADS)

    Bidin, Z. A.; Bohari, A. A. M.; Rais, S. L. A.; Saferi, M. M.

    2018-04-01

    Environment degradation issue has been a worldwide problem and various efforts have been done to minimise the problem. Construction sectors are pointed as one of the major contributors to its construction activities. Green-oriented procurement [GP] is considered as an environmental strategy to integrate the environmental practices into the construction delivery. Thus, this paper reviews the concept of GP and the practices related to it. The outcome of this research findings provides a basis for understanding the concept of GP and the further development of GP. The listed GP practices identified from this paper can serve as guidelines for industry practitioners to design, implement, and benchmarking the green practices in their procurement delivery.

  15. 7 CFR 3565.257 - Procurement actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...

  16. 7 CFR 3565.257 - Procurement actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...

  17. 48 CFR 52.223-2 - Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Biobased Products Under Service and Construction Contracts. 52.223-2 Section 52.223-2 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. As prescribed in 23.406(b), insert the following clause: Affirmative...

  18. A STUDY ON IMPLEMENTATION OF PROCUREMENT MANAGEMENT METHOD THAT DELIVERLY'S UNCERTAINTY OF EQUIPMENTS, MATERIALS AND INSTRUCTIONS

    NASA Astrophysics Data System (ADS)

    Asaine, Keita; Asaine, Wataru; Shiratsuchi, Ryoma; Yoshida, Takaichi; Hashimoto, Masaaki

    This paper highlights the issues of procurement management in construction projects, such as late delivery of purchased equipments/materials and missing instructions from customers, which cause delays of construction schedule and over-budget cost. We point that most of these problems are caused by lack of synchronization between procurement activities and process control. Therefore, we propose a managerial method which enables better synchronization between the two by applying this method to a construction company. We discuss the necessary conditions and validity of incorporating it and show the way how to establish the mechanics through the case study. Furthermore, we analyze that the feature of this method is not only addressing procurement issues but also bringing additional benefits, such as shortening project lead time and reducing project cost.

  19. Waste-efficient materials procurement for construction projects: A structural equation modelling of critical success factors.

    PubMed

    Ajayi, Saheed O; Oyedele, Lukumon O

    2018-05-01

    Albeit the understanding that construction waste is caused by activities ranging from all stages of project delivery process, research efforts have been concentrated on design and construction stages, while the possibility of reducing waste through materials procurement process is widely neglected. This study aims at exploring and confirming strategies for achieving waste-efficient materials procurement in construction activities. The study employs sequential exploratory mixed method approach as its methodological framework, using focus group discussion, statistical analysis and structural equation modelling. The study suggests that for materials procurement to enhance waste minimisation in construction projects, the procurement process would be characterised by four features. These include suppliers' commitment to low waste measures, low waste purchase management, effective materials delivery management and waste-efficient Bill of Quantity, all of which have significant impacts on waste minimisation. This implies that commitment of materials suppliers to such measures as take back scheme and flexibility in supplying small materials quantity, among others, are expected of materials procurement. While low waste purchase management stipulates the need for such measures as reduced packaging and consideration of pre-assembled/pre-cut materials, efficient delivery management entails effective delivery and storage system as well as adequate protection of materials during the delivery process, among others. Waste-efficient specification and bill of quantity, on the other hand, requires accurate materials take-off and ordering of materials based on accurately prepared design documents and bill of quantity. Findings of this study could assist in understanding a set of measures that should be taken during materials procurement process, thereby corroborating waste management practices at other stages of project delivery process. Copyright © 2018. Published by Elsevier Ltd.

  20. 13 CFR 125.2 - Prime contracting assistance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... participation unlikely; (ii) Seeks to package or consolidate discrete construction projects; or (iii) Meets the... participation unlikely, or if a proposed procurement for construction seeks to package or consolidate discrete... discrete projects. (5) In conjunction with their duties to promote the set-aside of procurements for small...

  1. 13 CFR 125.2 - Prime contracting assistance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... participation unlikely; (ii) Seeks to package or consolidate discrete construction projects; or (iii) Meets the... participation unlikely, or if a proposed procurement for construction seeks to package or consolidate discrete... discrete projects. (5) In conjunction with their duties to promote the set-aside of procurements for small...

  2. 13 CFR 125.2 - Prime contracting assistance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... participation unlikely; (ii) Seeks to package or consolidate discrete construction projects; or (iii) Meets the... participation unlikely, or if a proposed procurement for construction seeks to package or consolidate discrete... discrete projects. (5) In conjunction with their duties to promote the set-aside of procurements for small...

  3. 41 CFR 61-300.1 - What are the purpose and scope of this part?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... States for the procurement of personal property and non-personal services (including construction), and... for the procurement of personal property and non-personal services (including construction) was... Relating to Public Contracts OFFICE OF THE ASSISTANT SECRETARY FOR VETERANS' EMPLOYMENT AND TRAINING...

  4. 41 CFR 61-300.1 - What are the purpose and scope of this part?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... States for the procurement of personal property and non-personal services (including construction), and... for the procurement of personal property and non-personal services (including construction) was... Relating to Public Contracts OFFICE OF THE ASSISTANT SECRETARY FOR VETERANS' EMPLOYMENT AND TRAINING...

  5. 41 CFR 61-300.1 - What are the purpose and scope of this part?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... States for the procurement of personal property and non-personal services (including construction), and... for the procurement of personal property and non-personal services (including construction) was... Relating to Public Contracts OFFICE OF THE ASSISTANT SECRETARY FOR VETERANS' EMPLOYMENT AND TRAINING...

  6. 41 CFR 61-300.1 - What are the purpose and scope of this part?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... States for the procurement of personal property and non-personal services (including construction), and... for the procurement of personal property and non-personal services (including construction) was... Relating to Public Contracts OFFICE OF THE ASSISTANT SECRETARY FOR VETERANS' EMPLOYMENT AND TRAINING...

  7. 41 CFR 61-300.1 - What are the purpose and scope of this part?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... States for the procurement of personal property and non-personal services (including construction), and... for the procurement of personal property and non-personal services (including construction) was... Relating to Public Contracts OFFICE OF THE ASSISTANT SECRETARY FOR VETERANS' EMPLOYMENT AND TRAINING...

  8. 76 FR 29728 - Notice of Intent To Prepare an Environmental Impact Statement and Notice of Potential Floodplain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... 2.0 program would proceed through 2020 with design, construction, operation, and monitoring... of this test includes project definition, design, procurement, manufacture, installation, startup... the repowered oxy-combustion design. The station contains existing infrastructure that could support...

  9. 13 CFR 124.507 - What procedures apply to competitive 8(a) procurements?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... boundaries are eligible to submit offers. (3) Competition for all non-construction requirements. Except for... procedures. Procuring activities will conduct competitions among and evaluate offers received from... the Participant submitted its initial offer which includes price. (5) If the procuring activity...

  10. NASA procurement report, FY 1992

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during the first six months of Fiscal Year 1992. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during the first six months of Fiscal Year 1992. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplementary agreements, change orders, or terminations to a contract that change the total amount of funds obligated.

  11. 40 CFR 31.36 - Procurement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... procurements, contain features which unduly restrict competition. The description may include a statement of... requirements of a procurement. The specific features of the named brand which must be met by offerors shall be...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American...

  12. 40 CFR 31.36 - Procurement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... procurements, contain features which unduly restrict competition. The description may include a statement of... requirements of a procurement. The specific features of the named brand which must be met by offerors shall be...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American...

  13. 40 CFR 31.36 - Procurement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... procurements, contain features which unduly restrict competition. The description may include a statement of... requirements of a procurement. The specific features of the named brand which must be met by offerors shall be...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American...

  14. 40 CFR 35.936-21 - Delegation to State agencies; certification of procurement systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; certification of procurement systems. 35.936-21 Section 35.936-21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.936-21 Delegation to State agencies; certification of procurement...

  15. NASA procurement report, FY 1993

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during fiscal year 1993. The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during fiscal year 1993. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractural actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.

  16. Annual Procurement Report, Fiscal Year 1997

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1997. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during Fiscal Year 1997. However, these larger procurements accounted for only 43 percent of the total actions. Procurement action, as used in this report means contractual actions to obtain supplies, services or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or termination's to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract. The Annual Procurement Report is also available via the internet on the Procurement homepage.

  17. 49 CFR 238.103 - Fire safety.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Fire safety. 238.103 Section 238.103... § 238.103 Fire safety. (a) Materials. (1) Materials used in constructing a passenger car or a cab of a... section at the time it was tested. (c) Fire safety analysis for procuring new passenger cars and...

  18. 49 CFR 238.103 - Fire safety.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Fire safety. 238.103 Section 238.103... § 238.103 Fire safety. (a) Materials. (1) Materials used in constructing a passenger car or a cab of a... section at the time it was tested. (c) Fire safety analysis for procuring new passenger cars and...

  19. 49 CFR 238.103 - Fire safety.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Fire safety. 238.103 Section 238.103... § 238.103 Fire safety. (a) Materials. (1) Materials used in constructing a passenger car or a cab of a... section at the time it was tested. (c) Fire safety analysis for procuring new passenger cars and...

  20. Tank farms pump critical characteristic and specification guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Titzler, P.A.

    The Design Authority group for Tank Farms, in conjunction with the Construction Projects organization, have recognized that there is a need to provide consistency in the procurement and testing of pumps and to assure that known critical attributes and features are included with each pump order as well as to reduce potential confusion by pump suppliers. As a result, a panel of pump experts representing Lockheed Martin Hanford Company (LMHC), Fluor Daniel Northwest (FDNW), Numatec Hanford Corporation (NHC), SGN Eurisys Services Corporation (SESC), and ARES Corporation has been assembled to prepare a guide for pump specifications. This document contains themore » consensus listing of critical characteristics and procurement recommendations of the panel. It is intended to be used as a guide for future pump procurement activities. If followed, it will help reduce cleanup costs at the Hanford Site and promote prompt approval of pumping system designs and procurement specifications. Alternate criteria may be specified on a case by case basis if deviation from the requirements contained herein is merited due to special circumstances.« less

  1. Summary data on all NASA procurement actions

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1992 (FY-92). The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during FY-92. However, these larger procurements accounted for only 28 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.

  2. Creating Cost Growth Models for the Engineering and Manufacturing Development Phase of Acquisition Using Logistic and Multiple Regression

    DTIC Science & Technology

    2004-03-01

    constant variance via an analysis of the residuals, as well as the Breusch - Pagan test (see Figure 3 below). As a result, we follow the footsteps of...reasonably normal, which ensures that our residuals meet the assumption of constant variance by passing the Breusch - Pagan test (see Figure 4 below...sections for Research and Development, Test and Evaluation (RDT&E), procurement and military construction (Jarvaise, 1996:3). While differing

  3. Energy Systems Integration Newsletter | Energy Systems Integration Facility

    Science.gov Websites

    simulated sequences based on a model network. The competitive procurement process provided comparative , procurement help, design reviews, and now construction support. Miramar project support is part of integrated

  4. ITS procurement : analysis and recommendations.

    DOT National Transportation Integrated Search

    1994-01-01

    Virginia has met with a variety of difficulties and delays in its procurement of intelligent transportation systems, components, and studies. The Fastoll Automatic Toll System was initiated in 1987, and construction has still not begun. It has been t...

  5. An Analytic Model for DoD Divestments

    DTIC Science & Technology

    2015-04-30

    Modernization (Research, Development, Test, & Evaluation [RDT&E], Procurement, Military Construction, Science , & Technology, and Weapons Acquisition), and...from the insurance industry as variables that impact actuarial calculations are also worth considering here. For example, as the insurer of national...initiatives (GAO-14-134). Washington, DC: Author. Hardin, G. (1968). The tragedy of the commons. Science , 162, 1243–1248. Harrison, T. (2012, August

  6. 76 FR 81940 - Submission for OMB Review; Biobased Procurements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Procurements AGENCY: Department of Defense (DOD), General Services Administration (GSA), and National... Products Under Service and Construction Contracts, is being revised to require prime contractors to report...

  7. Photovoltaic balance-of-system designs and costs at PVUSA

    NASA Astrophysics Data System (ADS)

    Reyes, A. B.; Jennings, C.

    1995-05-01

    This report is one in a series of 1994-1995 PVUSA reports that document PVUSA lessons learned at demonstration sites in California and Texas. During the last 7 years (1988 to 1994), 16 PV systems ranging from 20 kW to 500 kW have been installed. Six 20-kW emerging module technology (EMT) arrays and three turnkey (i.e., vendor designed and integrated) utility-scale systems were procured and installed at PVUSA's main test site in Davis, California. PVUSA host utilities have installed a total of seven EMT arrays and utility-scale systems in their service areas. Additional systems at Davis and host utility sites are planned. One of PVUSA's key objectives is to evaluate the performance, reliability, and cost of PV balance-of-system (BOS). In the procurement stage PVUSA encouraged innovative design to improve upon present practice by reducing maintenance, improving reliability, or lowering manufacturing or construction costs. The project team worked closely with suppliers during the design stage not only to ensure designs met functional and safety specifications, but to provide suggestions for improvement. This report, intended for the photovoltaic (PV) industry and for utility project managers and engineers considering PV plant construction and ownership, documents PVUSA utility-scale system design and cost lessons learned. Complementary PVUSA topical reports document: construction and safety experience; five-year assessment of EMTs; validation of the Kerman 500-kW grid-support PV plant benefits; PVUSA instrumentation and data analysis techniques; procurement, acceptance, and rating practices for PV power plants; experience with power conditioning units and power quality.

  8. Procurement of novel microanalysis equipment for construction materials.

    DOT National Transportation Integrated Search

    2012-02-01

    The equipment procured (i.e. an Orbis micro X-ray Fluorescence (MXRF) and an APSEX personal Scanning Electron Microscope (PSEM)) is part of the next generation of micro analytical equipment. These tools have the ability to make large volumes of...

  9. 78 FR 41694 - Final Priority and Requirements; Education Facilities Clearinghouse

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... the collection and dissemination of best practices for the planning, design, financing, procurement... Facilities Clearinghouse program is to provide technical assistance and training on the planning, design... dissemination of best practices for the planning, design, financing, procurement, construction, improvement...

  10. ITER Construction—Plant System Integration

    NASA Astrophysics Data System (ADS)

    Tada, E.; Matsuda, S.

    2009-02-01

    This brief paper introduces how the ITER will be built in the international collaboration. The ITER Organization plays a central role in constructing ITER and leading it into operation. Since most of the ITER components are to be provided in-kind from the member countries, integral project management should be scoped in advance of real work. Those include design, procurement, system assembly, testing, licensing and commissioning of ITER.

  11. Procurement of construction services: a case study on bidding competition in Singapore public sector contracts

    NASA Astrophysics Data System (ADS)

    Oo, B. L.; Yan, Y.

    2018-04-01

    There are many variables that public clients need to consider in their bidding procedure to enhance efficiency in their procurement for construction services. This paper focusses on the competitive bidding process for public sector procurement of construction services in Singapore. A distinctive feature of the Singapore government competitive bidding process is that full bidding feedback information is released to all competing bidders (and public). The specific objectives are: (i) to examine the degree of competition in the construction markets; and (ii) to examine the bidding performance of competing bidders. Based on a collection of bidding data for a 15-month period, the results show the market environment of the Singapore public sector construction contracting is highly competitive with long bidder lists. In selection of contractors, only 50% of the contracts were awarded to lowest bidders. The results also show that the competing contractors can be broadly classified into three groups based on their bidding performance in terms of number of bidding attempts, bidding success rate and bidding competitiveness. These results provide a useful insight into the bidding competition in the Singapore public sector construction contracting, especially to new market entrants and foreign contractors who want to bid for jobs in Singapore.

  12. Protecting the Environment Through Public Procurement Law - The Case of Poland

    NASA Astrophysics Data System (ADS)

    Kozik, Renata; Karasińska-Jaśkowiec, Izabela

    2016-10-01

    The article presents the results of studies whose aim was to analyse public procurement procedures in the context of environmental protection, especially wastewater infrastructure, performed in the selected Polish municipalities. The selection criterions were the time of public procurement procedure - from 2009 until 2015 and that the contract was cofinanced by the European Union funds. The contracting authorities responsible for awarding specific contracts, were asked series of detailed questions about the environmental criteria and requirements contained in the tender documents for the construction contracts related to the wastewater infrastructure. The aim of the detailed study was to determine whether the actions taken by the contracting authorities in a tender procedure for the construction or operation of wastewater infrastructure include environmental issues. Authors examine also the applicable public procurement law regulation in Poland and Europe in the context of sustainable development and environmental protection. The study of public procurement law was to check whether the law regulation fully takes into account the environmental aspects of the planned investments. On this basis, conclusions have been made that laws are consistent and do not constitute an obstacle to awarding a contract positively affecting the environment.

  13. 40 CFR 35.925-20 - Procurement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Procurement. 35.925-20 Section 35.925-20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-20...

  14. 40 CFR 35.925-20 - Procurement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement. 35.925-20 Section 35.925-20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-20...

  15. An Overview of Follow-On Testing Activities of the A-3 Subscale Diffuser Test Project

    NASA Technical Reports Server (NTRS)

    Ryan, James E.

    2009-01-01

    An overview of NASA Stennis Space Center's (SSC) A-3 Subscale Diffuser Test (SDT) Project is presented. The original scope of the SDT Project, conducted from April 2007 to January 2008, collected data to support mitigation of risk associated with design and procurement activities of the A-3 Test Stand Project, an effort to construct a simulated altitude test facility at SSC in support of NASA's Constellation Program. Follow-on tests were conducted from May 2008 through August 2009, utilizing the SDT test setup as a testbed for additional risk mitigation activities. Included are descriptions of the Subscale Diffuser (SD) test article, the test facility configuration, and test approaches.

  16. The optimal hormonal replacement modality selection for multiple organ procurement from brain-dead organ donors

    PubMed Central

    Mi, Zhibao; Novitzky, Dimitri; Collins, Joseph F; Cooper, David KC

    2015-01-01

    The management of brain-dead organ donors is complex. The use of inotropic agents and replacement of depleted hormones (hormonal replacement therapy) is crucial for successful multiple organ procurement, yet the optimal hormonal replacement has not been identified, and the statistical adjustment to determine the best selection is not trivial. Traditional pair-wise comparisons between every pair of treatments, and multiple comparisons to all (MCA), are statistically conservative. Hsu’s multiple comparisons with the best (MCB) – adapted from the Dunnett’s multiple comparisons with control (MCC) – has been used for selecting the best treatment based on continuous variables. We selected the best hormonal replacement modality for successful multiple organ procurement using a two-step approach. First, we estimated the predicted margins by constructing generalized linear models (GLM) or generalized linear mixed models (GLMM), and then we applied the multiple comparison methods to identify the best hormonal replacement modality given that the testing of hormonal replacement modalities is independent. Based on 10-year data from the United Network for Organ Sharing (UNOS), among 16 hormonal replacement modalities, and using the 95% simultaneous confidence intervals, we found that the combination of thyroid hormone, a corticosteroid, antidiuretic hormone, and insulin was the best modality for multiple organ procurement for transplantation. PMID:25565890

  17. Environmental Criteria in the Spanish Public Works Procurement Process.

    PubMed

    Fuentes-Bargues, José Luis; González-Cruz, Mª Carmen; González-Gaya, Cristina

    2017-02-18

    Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group of countries, known as "Green 7", in the European Union. Environmental criteria is the fourth criterion in importance, but its weight in the global of the process is much lower than other criteria such as price, memory of the construction process and the delivery time. National administrations use environmental criteria more frequently because they have more resources and staff training about environmental issues. Environmental criteria are more used in the tendering of civil projects and works whose budget exceeds ten million euro due to the environmental impact of these kind and/or size of projects.

  18. Special Operations Forces: Opportunities Exist to Improve Transparency of Funding and Assess Potential to Lessen Some Deployments

    DTIC Science & Technology

    2015-07-01

    pace of special operations deployments, but opportunities may exist to better balance the workload across the joint force because activities...executes funding in operation and maintenance; procurement; research , development, test, and evaluation; and military construction accounts.13 SOCOM...regional awareness. Moreover, officials noted that increases in civilian positions were driven partly by DOD’s attempts to rebalance workload and become a

  19. 77 FR 44065 - Federal Acquisition Regulation; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... FAR. List of Subjects in 48 CFR Parts 1, 16, 22, and 52 Government procurement. Dated: July 16, 2012...--APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS 22.1801 [Amended] 0 4. Amend section 22.1801 by-- 0 a... Affirmative Procurement of Biobased Products Under Service and Construction Contracts. * * * * * Affirmative...

  20. Procurement Forms | NREL

    Science.gov Websites

    Certificate of Current Cost or Pricing Data Construction Specific Forms Pre-Award Documents Construction and manuals) Cost and Pricing Data Definitions Design-Build / Price Proposal Form Information

  1. ProCure21+ should speed scheme starts.

    PubMed

    Baillie, Jonathan

    2010-11-01

    This October saw the launch of the new ProCure21+ National Framework under which, the Department of Health (DH) team behind the new scheme claims, the NHS can potentially save a further pound 200 million of public money on top of the substantial sums saved under predecessor, ProCure21, via faster, more streamlined procurement, design, planning, and construction, of publicly-funded healthcare schemes. HEJ editor Jonathan Baillie discussed, with the DH's senior responsible officer (SRO) and P21+ team leader Peter Sellars, the background to the new Framework's introduction, the success of its forerunner, and the additional benefits that ProCure21 + (which is backed by organisations incuding HM Treasury, the National Audit Office, and the Office of Government Commerce) should bring to the entire healthcare building supply chain.

  2. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  3. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  4. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  5. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  6. Competition in the economic crisis: Analysis of procurement auctions.

    PubMed

    Gugler, Klaus; Weichselbaumer, Michael; Zulehner, Christine

    2015-01-01

    We study the effects of the recent economic crisis on firms׳ bidding behavior and markups in sealed bid auctions. Using data from Austrian construction procurements, we estimate bidders׳ construction costs within a private value auction model. We find that markups of all bids submitted decrease by 1.5 percentage points in the recent economic crisis, markups of winning bids decrease by 3.3 percentage points. We also find that without the government stimulus package this decrease would have been larger. These two pieces of evidence point to pro-cyclical markups.

  7. A Conceptual Framework for Procurement Decision Making Model to Optimize Supplier Selection: The Case of Malaysian Construction Industry

    NASA Astrophysics Data System (ADS)

    Chuan, Ngam Min; Thiruchelvam, Sivadass; Nasharuddin Mustapha, Kamal; Che Muda, Zakaria; Mat Husin, Norhayati; Yong, Lee Choon; Ghazali, Azrul; Ezanee Rusli, Mohd; Itam, Zarina Binti; Beddu, Salmia; Liyana Mohd Kamal, Nur

    2016-03-01

    This paper intends to fathom the current state of procurement system in Malaysia specifically in the construction industry in the aspect of supplier selection. This paper propose a comprehensive study on the supplier selection metrics for infrastructure building, weight the importance of each metrics assigned and to find the relationship between the metrics among initiators, decision makers, buyers and users. With the metrics hierarchy of criteria importance, a supplier selection process can be defined, repeated and audited with lesser complications or difficulties. This will help the field of procurement to improve as this research is able to develop and redefine policies and procedures that have been set in supplier selection. Developing this systematic process will enable optimization of supplier selection and thus increasing the value for every stakeholders as the process of selection is greatly simplified. With a new redefined policy and procedure, it does not only increase the company’s effectiveness and profit, but also make it available for the company to reach greater heights in the advancement of procurement in Malaysia.

  8. Cell module and fuel conditioner

    NASA Technical Reports Server (NTRS)

    Hoover, D. Q., Jr.

    1980-01-01

    Measurements of stack height changes with temperature and cell material characteristics were made. Stack 559 was assembled and components were fabricated for 560, 561, and 562. Stack 425 was transferred from the parallel DOE program and installed in the OS/IES simulation loop for mechanical and electrical testing. Construction and preliminary checkout of the 2 kW test facility was completed and design and procurement of the 8 kW test facility was initiated. The fuel conditioning subsystem design continued to evolve and the state points for the current design were calculated at full and part load conditions. Steam reforming catalyst activity tests were essentially completed and aging tests and CO shift converter tests were initiated.

  9. Trends in procurement costs for HIV commodities: a 7-year retrospective analysis of global fund data across 125 countries.

    PubMed

    Wafula, Francis; Agweyu, Ambrose; Macintyre, Kate

    2014-04-01

    Nearly 40% of Global Fund money goes toward procurement. However, no analyses have been published to show how costs vary across regions and time, despite the availability of procurement data collected through the Global Fund's price and quality reporting system. We analyzed data for the 3 most widely procured commodities for the prevention, diagnosis, and treatment of HIV. These were male condoms, HIV rapid tests, and the antiretroviral (ARV) combination of lamivudine/nevirapine/zidovudine. The compared costs, first across time (2005-2012), then across regions, and finally, between individual procurement reported through the price and quality reporting and pooled procurement reported through the Global Fund's voluntary pooled procurement system. All costs were adjusted for inflation and reported in US dollars. There were 2337 entries from 578 grants in 125 countries. The procurement cost for the ARV dropped substantially over the period, whereas those for condoms and HIV tests remained relatively stable. None of the commodity prices increased. Regional variations were pronounced for HIV tests, but minimal for condoms and the ARV. The unit cost for the 3-table ARV combination, for instance, varied between US$0.15 and US$0.23 in South Asia and the Eastern Europe/Central Asia regions, respectively, compared with a range of $0.23 (South Asia)-$1.50 (Eastern Europe/Central Asia) for a single diagnostic test. Pooled procurement lowered costs for condoms but not the other commodities. We showed how global procurement costs vary by region and time. Such analyses should be done more often to identify and correct market insufficiencies.

  10. Environmental Criteria in the Spanish Public Works Procurement Process

    PubMed Central

    Fuentes-Bargues, José Luis; González-Cruz, Mª Carmen; González-Gaya, Cristina

    2017-01-01

    Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group of countries, known as “Green 7”, in the European Union. Environmental criteria is the fourth criterion in importance, but its weight in the global of the process is much lower than other criteria such as price, memory of the construction process and the delivery time. National administrations use environmental criteria more frequently because they have more resources and staff training about environmental issues. Environmental criteria are more used in the tendering of civil projects and works whose budget exceeds ten million euro due to the environmental impact of these kind and/or size of projects. PMID:28218706

  11. 78 FR 76700 - Procurement Thresholds for Implementation of the Trade Agreements Act of 1979

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-18

    ...-Oman Free Trade Agreement (United States-Oman FTA), Chapter 9 of the United States- Panama Trade... FTA, Chapter 10 of NAFTA, Chapter 9 of the United States-Oman FTA, Chapter 9 of the United States...) Procurement of construction services--$12,721,740. IX. United States-Oman FTA, Chapter 9 A. Central Level...

  12. 48 CFR 736.602-5 - Short selection process for procurements not to exceed the simplified acquisition threshold.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Short selection process for procurements not to exceed the simplified acquisition threshold. 736.602-5 Section 736.602-5 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACT...

  13. 48 CFR 736.602-5 - Short selection process for procurements not to exceed the simplified acquisition threshold.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Short selection process for procurements not to exceed the simplified acquisition threshold. 736.602-5 Section 736.602-5 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACT...

  14. 48 CFR 736.602-5 - Short selection process for procurements not to exceed the simplified acquisition threshold.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Short selection process for procurements not to exceed the simplified acquisition threshold. 736.602-5 Section 736.602-5 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACT...

  15. Department of the Army Justification of Estimates for Fiscal Year 1986. Procurement Appropriations-Construction Program Submitted to Congress February 1985. Part 1. DD Forms 1391.

    DTIC Science & Technology

    1985-02-01

    CATALOG NUMBER 4. TITLE (and Subtitle)(in 6 parts) Department of the Army S. TYPE OF REPORT & PERIOD COVERED Justification of Estimates for Fiscal Year... 6 - PERFORMING ORG. REPORT NUMBER Veh., Ammunition, Other Procurement & Constr Proer ms 7. AUTHOR(a) 8. CONTRACT OR GRANT NUMBER(&) 5 Department of...I ry 19e 6 MILITAP. Y CONSTRUCTION PRO3[CT DATA I-.-1 005 I .. . . .. . .LL .... _ I . a,.-ta13st an and toction I A.. Project Title St rttford Arcy

  16. Construction and Testing of an 80C86 Based Communications Controller for the Petite Amateur Navy Satellite (PANSAT)

    DTIC Science & Technology

    1990-12-01

    S) Naval Postgraduate School 6a. NAME OF PERFORMING ORGANIZATION 6b OFFICE SYMBOL 7a NAME OF MONITORING ORGANIZATION (if applicable ) Code 33 6c...FUNDING/SPONSORING Bb. OFFICE SYMBOL 9. PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION (If applicable ) 8c. ADDRESS (City, State, and ZIP Code...system’s individual components. Then one derives the overall system reliability from that information, using a simple mathematical model, to be

  17. Codes Don't Always Get Enforced, But Contracts Do: Changing the Procurement Paradigm to Drive Building Energy Performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Torcellini, Paul A; Scheib, Jennifer G; Pless, Shanti

    New construction could account for more than 25% of the U.S. energy consumption by 2030. Millions of square feet are built every year that will not perform as expected - despite advancing codes, rating systems, super-efficient technologies, and advanced utility programs. With retrofits of these under-performers decades away, savings potential will be lost for years to come. Only the building owner is in the driver's seat to demand - and verify - higher-performing buildings. Yet our current policy and market interventions really target the design team, not the owner. Accelerate Performance, a U.S. Department of Energy funded initiative, is changingmore » the building procurement approach to drive deeper, verified savings in three pilot states: Illinois, Minnesota, and Connecticut. Performance-based procurement ties energy performance to design and contractor team compensation while freeing them to meet energy targets with strategies most familiar to them. The process teases out the creativity of the design and contracting teams to deliver energy performance - without driving up the construction cost. The paper will share early results and lessons learned from new procurement and contract approaches in government, public, and private sector building projects. The paper provides practical guidance for building owners, facilities managers, design, and contractor teams who wish to incorporate effective performance-based procurement for deeper energy savings in their buildings.« less

  18. 13 CFR 124.507 - What procedures apply to competitive 8(a) procurements?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... developmental and transitional stages of program participation. (2) Construction competitions. Based on its knowledge of the 8(a) BD portfolio, SBA will determine whether a competitive 8(a) construction requirement... construction. (3) If SBA determines that the apparent successful offeror is ineligible, SBA will notify the...

  19. 22 CFR 228.17 - Special procurement rules for construction and engineering services.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... engineering services. 228.17 Section 228.17 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES FOR... construction and engineering services. Advanced developing countries, as defined in § 228.01, which USAID has... engineering services are not eligible to furnish USAID-financed construction and engineering services unless...

  20. 22 CFR 228.17 - Special procurement rules for construction and engineering services.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... engineering services. 228.17 Section 228.17 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES FOR... construction and engineering services. Advanced developing countries, as defined in § 228.01, which USAID has... engineering services are not eligible to furnish USAID-financed construction and engineering services unless...

  1. 22 CFR 228.17 - Special procurement rules for construction and engineering services.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... engineering services. 228.17 Section 228.17 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES FOR... construction and engineering services. Advanced developing countries, as defined in § 228.01, which USAID has... engineering services are not eligible to furnish USAID-financed construction and engineering services unless...

  2. Global survey of malaria rapid diagnostic test (RDT) sales, procurement and lot verification practices: assessing the use of the WHO-FIND Malaria RDT Evaluation Programme (2011-2014).

    PubMed

    Incardona, Sandra; Serra-Casas, Elisa; Champouillon, Nora; Nsanzabana, Christian; Cunningham, Jane; González, Iveth J

    2017-05-15

    Malaria rapid diagnostic tests (RDTs) play a critical role in malaria case management, and assurance of quality is a key factor to promote good adherence to test results. Since 2007, the World Health Organization (WHO) and the Foundation for Innovative New Diagnostics (FIND) have coordinated a Malaria RDT Evaluation Programme, comprising a pre-purchase performance evaluation (product testing, PT) and a pre-distribution quality control of lots (lot testing, LT), the former being the basis of WHO recommendations for RDT procurement. Comprehensive information on malaria RDTs sold worldwide based on manufacturers' data and linked to independent performance data is currently not available, and detailed knowledge of procurement practices remains limited. The use of the PT/LT Programme results as well as procurement and lot verification practices were assessed through a large-scale survey, gathering product-specific RDT sales and procurement data (2011-14 period) from a total of 32 manufacturers, 12 procurers and 68 National Malaria Control Programmes (NMCPs). Manufacturers' reports showed that RDT sales had more than doubled over the four years, and confirmed a trend towards increased compliance with the WHO procurement criteria (from 83% in 2011 to 93% in 2014). Country-level reports indicated that 74% of NMCPs procured only 'WHO-compliant' RDT products, although procurers' transactions datasets revealed a surprisingly frequent overlap of different products and even product types (e.g., Plasmodium falciparum-only and Plasmodium-pan) in the same year and country (60 and 46% of countries, respectively). Importantly, the proportion of 'non-complying' (i.e., PT low scored or not evaluated) products was found to be higher in the private health care sector than in the public sector (32% vs 5%), and increasing over time (from 22% of private sector sales in 2011 to 39% in 2014). An estimated 70% of the RDT market was covered by the LT programme. The opinion about the PT/LT Programmes was positive overall, and quality of RDTs as per the PT Programme was rated as the number one procurement criteria. This survey provided in-depth information on RDT sales and procurement dynamics, including the largely unstudied private sector, and demonstrated how the WHO-FIND Programme has positively influenced procurement practices in the public sector.

  3. 76 FR 76808 - Procurement Thresholds for Implementation of the Trade Agreements Act of 1979

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ...), Chapter 9 of the United States-Peru Trade Promotion Agreement (U.S.-Peru TPA), and Chapter 13 of the..., Chapter 9 of the U.S.-Peru TPA, and Chapter 13 of the U.S.-Singapore FTA, do hereby determine, effective... Entities-- $622,000; (2) Procurement of construction services--$12,399,671. IX. U.S.-Peru TPA, Chapter 9 A...

  4. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  5. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  6. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  7. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  8. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  9. A Cost-Minimization Analysis of Tissue-Engineered Constructs for Corneal Endothelial Transplantation

    PubMed Central

    Tan, Tien-En; Peh, Gary S. L.; George, Benjamin L.; Cajucom-Uy, Howard Y.; Dong, Di; Finkelstein, Eric A.; Mehta, Jodhbir S.

    2014-01-01

    Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses. PMID:24949869

  10. A cost-minimization analysis of tissue-engineered constructs for corneal endothelial transplantation.

    PubMed

    Tan, Tien-En; Peh, Gary S L; George, Benjamin L; Cajucom-Uy, Howard Y; Dong, Di; Finkelstein, Eric A; Mehta, Jodhbir S

    2014-01-01

    Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses.

  11. 48 CFR 9904.417 - Cost of money as an element of the cost of capital assets under construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... element of the cost of capital assets under construction. 9904.417 Section 9904.417 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT... of money as an element of the cost of capital assets under construction. ...

  12. 75 FR 13765 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... a project labor agreement (PLA), as they may decide appropriate, on large-scale construction... efficiency in Federal procurement. A PLA is a pre-hire collective bargaining agreement with one or more labor...

  13. Vietnam Report, Number 2393, Tap Chi Cong San, Number 6, June 1982.

    DTIC Science & Technology

    1982-09-14

    PROCUREMENT OF PUBLICATIONS JPRS publications may be ordered from the National Technical Information Service, Springfield, Virginia 22161. In order- ing, it...to matters other than procurement may be addressed to Joint Publications Research Service, 1000 North Glebe Road, Arlington, Virginia 22201. JPRS...concentrate all efforts on preventing the other side from making a wrong move, thereby formulating a constructive solution to the replacement of the arms

  14. Management systems research study

    NASA Technical Reports Server (NTRS)

    Bruno, A. V.

    1975-01-01

    The development of a Monte Carlo simulation of procurement activities at the NASA Ames Research Center is described. Data cover: simulation of the procurement cycle, construction of a performance evaluation model, examination of employee development, procedures and review of evaluation criteria for divisional and individual performance evaluation. Determination of the influences and apparent impact of contract type and structure and development of a management control system for planning and controlling manpower requirements.

  15. Current Chinese Leadership Update

    DTIC Science & Technology

    1985-08-01

    Horst Soelle fontacts East German Minister for the Construction of Heavy Machinery and Equipment Rolf Kersten 6 Contacts East German Deputy Minister for...Minister for Defense for Procurement Adam Butler Ana_1sis Commander of the CPLA Air Force Zhang Tingfa visited 9 France (29 May-9 June 1985) and the...Chief Marshal Sir Keith Williamson, MinisteL of Defense for Procurement Adam Butler, and other unidentified British military officials. Zhang visited

  16. Loglines. May - June 2010

    DTIC Science & Technology

    2010-06-01

    able to get construction materials, food and spare parts into a land-locked country . More than 80 percent of the containers shipped through this...procurement management at DLA Oklahoma City, has developed a strategic roadmap for DLR decision-makers. “Trying to get our arms around all the contracts...currently in place and develop - ing a comprehensive approach to future support has been challenging,” Yort said. Transferring procurement of DLRs to

  17. 7 CFR 1726.301 - Borrower contractual obligations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES RUS Standard Forms § 1726.301... which the borrower agrees to use RUS standard forms of contracts for construction, procurement... agreements as implemented by this part, borrowers must use those forms of contract (hereinafter sometimes...

  18. Construction Management for Educational Facilities: Professional Services' Procurement and Competitive Bid Statutes.

    ERIC Educational Resources Information Center

    Goldblatt, Steven M.; Wood, R. Craig

    Construction management is utilized when a school district engages a firm to coordinate a total project. The construction management seeks to save an owner time and cost primarily through better contractor coordination and project management. These services may include the planning and design phases of the project as well as the actual…

  19. 7 CFR 1726.250 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Modifications to RUS Standard Contract Forms § 1726.250 General. RUS provides standard forms of contract for the procurement of materials, equipment, and construction and for contract amendments and various related forms for use by RUS borrowers. See § 1726.304 for...

  20. Perimeter intrusion detection and assessment system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eaton, M.J.; Jacobs, J.; McGovern, D.E.

    1977-11-01

    To obtain an effective perimeter intrusion detection system requires careful sensor selection, procurement, and installation. The selection process involves a thorough understanding of the unique site features and how these features affect the performance of each type of sensor. It is necessary to develop procurement specifications to establish acceptable sensor performance limits. Careful explanation and inspection of critical installation dimensions is required during on-site construction. The implementation of these activities at a particular site is discussed.

  1. An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)

    DTIC Science & Technology

    2013-03-01

    Corps of Engineers (USACE) or the Naval Facilities Engineering Command (NAVFAC) for design and construction of the annual military construction...AFCEC in lieu of AFCEE or AFCESA. The selection, and policies, of design and construction agents may cause cost premiums for Air Force MILCON...private industry best practices such as relational contracting, schedule performance, and design -build procurement methods. All of these research

  2. A case study : Michigan Intelligent Transportation System Center : use of a design/build/warranty contract

    DOT National Transportation Integrated Search

    2000-03-01

    Many ITS projects are stand-alone in nature, and do not have to be procured under rules for construction. The installation of field devices and communications infrastructure often meets the definition of construction. However, if a project involves t...

  3. Interval linear programming model for long-term planning of vehicle recycling in the Republic of Serbia under uncertainty.

    PubMed

    Simic, Vladimir; Dimitrijevic, Branka

    2015-02-01

    An interval linear programming approach is used to formulate and comprehensively test a model for optimal long-term planning of vehicle recycling in the Republic of Serbia. The proposed model is applied to a numerical case study: a 4-year planning horizon (2013-2016) is considered, three legislative cases and three scrap metal price trends are analysed, availability of final destinations for sorted waste flows is explored. Potential and applicability of the developed model are fully illustrated. Detailed insights on profitability and eco-efficiency of the projected contemporary equipped vehicle recycling factory are presented. The influences of the ordinance on the management of end-of-life vehicles in the Republic of Serbia on the vehicle hulks procuring, sorting generated material fractions, sorted waste allocation and sorted metals allocation decisions are thoroughly examined. The validity of the waste management strategy for the period 2010-2019 is tested. The formulated model can create optimal plans for procuring vehicle hulks, sorting generated material fractions, allocating sorted waste flows and allocating sorted metals. Obtained results are valuable for supporting the construction and/or modernisation process of a vehicle recycling system in the Republic of Serbia. © The Author(s) 2015.

  4. Fiscal Year 2012 United States Air Force Agency Financial Report

    DTIC Science & Technology

    2012-01-01

    Air Force Research Laboratory (AFRL) and Lawrence Livermore National Laboratory (LLNL) aggressively designed and tested an advanced warhead to...Reaper procurement & RPA capabilities, Light Attack Armed Reconnaissance buys, Joint Strike Fighter, satellites). Research , Development, Test and...Military Personnel Operations, Readiness & Support Procurement Research , Development, Test & Evaluation

  5. U.S.-Coalition Forces and Host Nations: DOTmLPF-P for Contingency Procurements. Part 2. Conclusion

    DTIC Science & Technology

    2014-08-01

    doesn’t have to be stood up. Examples include textile/cloth- ing/ footwear , construction, and furniture, industries that usu- ally exist in some...meet its needs but be within the HNVs’ capability to manufacture. Finally, materials used by HNVs to manufacture products under U.S. or HNG...procurement efforts should come from reliable sources with processes and physical features in place to prevent substandard or fake material from entering the

  6. 3 CFR 13502 - Executive Order 13502 of February 6, 2009. Use of Project Labor Agreements for Federal...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... developing by providing structure and stability to large-scale construction projects, thereby promoting the... procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing... construction projects receiving Federal financial assistance, would help to promote the economical, efficient...

  7. 40 CFR 31.36 - Procurement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... waste-water treatment works project and wishes to retain that firm or individual during construction of...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American” requirements in paragraphs (c)(5) (i)-(iii) of this section. Section 215 of the Clean Water Act requires that...

  8. 76 FR 28333 - Electric Engineering, Architectural Services, Design Policies and Construction Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ... CFR Parts 1724 and 1726 RIN 0572-AC20 Electric Engineering, Architectural Services, Design Policies... standard forms of contracts promulgated by RUS for construction, procurement, engineering services and... XVII of title 7 of the Code of Federal Regulations as follows: PART 1724--ELECTRIC ENGINEERING...

  9. 7 CFR 2902.17 - Plastic insulating foam for residential and commercial construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Plastic insulating foam for residential and... BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 2902.17 Plastic insulating foam for residential and commercial construction. (a) Definition. Spray-in-place plastic foam products designed to...

  10. 7 CFR 3201.17 - Plastic insulating foam for residential and commercial construction.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Plastic insulating foam for residential and... DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.17 Plastic insulating foam for residential and commercial construction. (a) Definition. Spray-in-place plastic foam products designed to...

  11. 7 CFR 3201.17 - Plastic insulating foam for residential and commercial construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Plastic insulating foam for residential and... DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.17 Plastic insulating foam for residential and commercial construction. (a) Definition. Spray-in-place plastic foam products designed to...

  12. 7 CFR 3201.17 - Plastic insulating foam for residential and commercial construction.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Plastic insulating foam for residential and... DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.17 Plastic insulating foam for residential and commercial construction. (a) Definition. Spray-in-place plastic foam products designed to...

  13. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    NASA Astrophysics Data System (ADS)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  14. Compulsory licensing often did not produce lower prices for antiretrovirals compared to international procurement.

    PubMed

    Beall, Reed F; Kuhn, Randall; Attaran, Amir

    2015-03-01

    Compulsory licensing has been widely suggested as a legal mechanism for bypassing patents to introduce lower-cost generic antiretrovirals for HIV/AIDS in developing countries. Previous studies found that compulsory licensing can reduce procurement prices for drugs, but it is unknown how the resulting prices compare to procurements through the Global Fund to Fight AIDS, Tuberculosis, and Malaria; UNICEF; and other international channels. For this study we systematically constructed a case-study database of compulsory licensing activity for antiretrovirals and compared compulsory license prices to those in the World Health Organization's (WHO's) Global Price Reporting Mechanism and the Global Fund's Price and Quality Reporting Tool. Thirty compulsory license cases were analyzed with 673 comparable procurements from WHO and Global Fund data. Compulsory license prices exceeded the median international procurement prices in nineteen of the thirty case studies, often with a price gap of more than 25 percent. Compulsory licensing often delivered suboptimal value when compared to the alternative of international procurement, especially when used by low-income countries to manufacture medicines locally. There is an ongoing need for multilateral and charitable actors to work collectively with governments and medicine suppliers on policy options. Project HOPE—The People-to-People Health Foundation, Inc.

  15. The transformation of the tender evaluation process in public procurement in Poland

    NASA Astrophysics Data System (ADS)

    Plebankiewicz, E.; Kozik, R.

    2017-10-01

    Procedures regarding the evaluation of tenders have been changed since the public procurement law was enacted (it came into force in January 1, 1995). The contracting authority could apply both the criteria related to the qualities of the contractor and those related to the to the subject - matter of public contract. Two extensive amendments in 2001 and a government project introduced vital regulations and excluded the possibility of applying criteria related to the qualities of the contractor. Act of 29 January 2004 Public Procurement Law allowed to use price as the sole contract award criterion. The changes in the Law in 2014 restricted that possibility to the situation in which the subject matter of a contract is commonly available and has established quality standards. The Act of 22 June 2016 amending the Public Procurement Law Act and some other laws introduced the new criteria list and limited the importance of the price criterion in the certain situations. Instead of price, the cost can also be a criterion for tender evaluation. The cost criterion can be determined using life cycle costing. In the paper, based on contract notices of open tendering published in the Public Procurement Bulletin, the criteria of construction contract selection will be analysed. In particular the effectiveness of changes in the Procurement Law will be researched.

  16. 77 FR 34025 - Procurement List; Addition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ..., Engineering Research & Development Center (ERDC), Construction Engineering Research Lab (CERL), 2902 Newmark... W2R2 Const Engrg Lab, Champaign, IL Patricia Briscoe, Deputy Director, Business Operations (Pricing and...

  17. 76 FR 71121 - Notice of Proposed Buy America Waiver

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... seeking a waiver for the procurement of glass panels needed to construct two structural glass pavilions... produced in the United States. 49 CFR 661.7(c)(1). Structural glass is a manufactured product. As such, it.... The proposals included glass panels to be utilized in the construction of two structural glass...

  18. 75 FR 16825 - Notice of Modifications to U.S. Commitments Under the World Trade Organization Government...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... hearing- or speech-impairments may access this number through TTY by calling the toll-free Federal... construction project, and the total construction project has an estimated value of more than $7,804,000....S. Commitments Under the World Trade Organization Government Procurement Agreement To Implement...

  19. Sandia National Laboratories: Working with Sandia: Procurement:

    Science.gov Websites

    Payrolls Before you can submit a timecard you must enter your employees. Please see the Contractor Job Aid link for that specific contract. Please refer to the Contractor Job Aid (MS Word)for further @sandia.gov. Contractor ES&H ES&H for Construction & Service Contracts 01065 Construction Standard

  20. Materiel Acquisition Management Guide

    DTIC Science & Technology

    1980-02-11

    Ii-n manager and his staff, hiqhlighted by the specific de - tails provided in tabbea one-sheet descriptions. • Part III - Areas of Aco-uisition...support program requirements? Support and Test Equipment (S/TE)? Spares Support (SS)? Storage and transportation ? training? o Have test and...PACKAGES PROCUREMENT PLANNING/ PROCUREMENT pLANS TEST AND EVALUATION - PLANNING PRODUCIBILITY ENGINEERING AND TRAINING PLANNING (PEP) TRANSPORTABILITY

  1. 7 CFR 3201.68 - Erosion control materials.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...

  2. 7 CFR 3201.68 - Erosion control materials.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...

  3. 7 CFR 3201.68 - Erosion control materials.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...

  4. 7 CFR 1726.204 - Multiparty unit price quotations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.204 Multiparty unit price quotations. The borrower or its engineer must contact a sufficient number of...

  5. 7 CFR 1726.205 - Multiparty lump sum quotations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.205 Multiparty lump sum quotations. The borrower or its engineer must contact a sufficient number of...

  6. 7 CFR 1726.205 - Multiparty lump sum quotations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.205 Multiparty lump sum quotations. The borrower or its engineer must contact a sufficient number of...

  7. 7 CFR 1726.204 - Multiparty unit price quotations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.204 Multiparty unit price quotations. The borrower or its engineer must contact a sufficient number of...

  8. 7 CFR 1726.204 - Multiparty unit price quotations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.204 Multiparty unit price quotations. The borrower or its engineer must contact a sufficient number of...

  9. 7 CFR 1726.205 - Multiparty lump sum quotations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.205 Multiparty lump sum quotations. The borrower or its engineer must contact a sufficient number of...

  10. 7 CFR 1726.205 - Multiparty lump sum quotations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.205 Multiparty lump sum quotations. The borrower or its engineer must contact a sufficient number of...

  11. 7 CFR 1726.204 - Multiparty unit price quotations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.204 Multiparty unit price quotations. The borrower or its engineer must contact a sufficient number of...

  12. 7 CFR 1726.205 - Multiparty lump sum quotations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.205 Multiparty lump sum quotations. The borrower or its engineer must contact a sufficient number of...

  13. 7 CFR 1726.204 - Multiparty unit price quotations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.204 Multiparty unit price quotations. The borrower or its engineer must contact a sufficient number of...

  14. 77 FR 22289 - Procurement List Proposed Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ...-McChord, WA. Stryker National Logistics Center, Building 2701 C Street SW., Auburn, WA. NPA: Skookum... Center, Construction Engineering Research Lab (ERDC-CERL), 2902 Newmark Drive, Champaign, IL. AT&T...

  15. Construction Quality Assurance Act of 2009

    THOMAS, 111th Congress

    Rep. Kanjorski, Paul E. [D-PA-11

    2009-07-31

    House - 10/23/2009 Referred to the Subcommittee on Government Management, Organization, and Procurement. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  16. Organ procurement from executed prisoners in China.

    PubMed

    Sharif, A; Singh, M Fiatarone; Trey, T; Lavee, J

    2014-10-01

    Organ procurement from executed prisoners in China is internationally condemned, yet this practice continues unabated in 2014. This is despite repeated announcements from Chinese authorities that constructive measures have been undertaken to conform to accepted ethical standards. While there is unanimous agreement on the unethical nature of using organs from executed prisoners, due to its limitations on voluntary and informed consent, there is insufficient coverage of forced organ procurement from prisoners of conscience without consent. Strategies to influence positive change in China over the last few decades have failed to bring this practice to an end. While organ donation and transplantation services in China have undergone considerable structural changes in the last few years, fundamental attempts to shift practice to ethically sourced organs have floundered. In this article, we discuss the organ trade in China, reflect upon organ procurement from executed prisoners (including both capital prisoners and prisoners of conscience) and provide an overview of contradictory Chinese efforts to halt forced organ procurement from executed prisoners. Finally, we highlight current actions being taken to address this issue and offer comprehensive recommendations to bring this ethically indefensible practice to an immediate end. © Copyright 2014 The American Society of Transplantation and the American Society of Transplant Surgeons.

  17. Eleventh-century shift in timber procurement areas for the great houses of Chaco Canyon

    PubMed Central

    Guiterman, Christopher H.; Dean, Jeffrey S.

    2016-01-01

    An enduring mystery from the great houses of Chaco Canyon is the origin of more than 240,000 construction timbers. We evaluate probable timber procurement areas for seven great houses by applying tree-ring width-based sourcing to a set of 170 timbers. To our knowledge, this is the first use of tree rings to assess timber origins in the southwestern United States. We found that the Chuska and Zuni Mountains (>75 km distant) were the most likely sources, accounting for 70% of timbers. Most notably, procurement areas changed through time. Before 1020 Common Era (CE) nearly all timbers originated from the Zunis (a previously unrecognized source), but by 1060 CE the Chuskas eclipsed the Zuni area in total wood imports. This shift occurred at the onset of Chaco florescence in the 11th century, a time with substantial expansion of existing great houses and the addition of seven new great houses in the Chaco Core area. It also coincides with the proliferation of Chuskan stone tools and pottery in the archaeological record of Chaco Canyon, further underscoring the link between land use and occupation in the Chuska area and the peak of great house construction. Our findings, based on the most temporally specific and replicated evidence of Chacoan resource procurement obtained to date, corroborate the long-standing but recently challenged interpretation that large numbers of timbers were harvested and transported from distant mountain ranges to build the great houses at Chaco Canyon. PMID:26644552

  18. Eleventh-century shift in timber procurement areas for the great houses of Chaco Canyon.

    PubMed

    Guiterman, Christopher H; Swetnam, Thomas W; Dean, Jeffrey S

    2016-02-02

    An enduring mystery from the great houses of Chaco Canyon is the origin of more than 240,000 construction timbers. We evaluate probable timber procurement areas for seven great houses by applying tree-ring width-based sourcing to a set of 170 timbers. To our knowledge, this is the first use of tree rings to assess timber origins in the southwestern United States. We found that the Chuska and Zuni Mountains (>75 km distant) were the most likely sources, accounting for 70% of timbers. Most notably, procurement areas changed through time. Before 1020 Common Era (CE) nearly all timbers originated from the Zunis (a previously unrecognized source), but by 1060 CE the Chuskas eclipsed the Zuni area in total wood imports. This shift occurred at the onset of Chaco florescence in the 11th century, a time with substantial expansion of existing great houses and the addition of seven new great houses in the Chaco Core area. It also coincides with the proliferation of Chuskan stone tools and pottery in the archaeological record of Chaco Canyon, further underscoring the link between land use and occupation in the Chuska area and the peak of great house construction. Our findings, based on the most temporally specific and replicated evidence of Chacoan resource procurement obtained to date, corroborate the long-standing but recently challenged interpretation that large numbers of timbers were harvested and transported from distant mountain ranges to build the great houses at Chaco Canyon.

  19. Cross-national research on contractor evaluation procedures in public works procurement

    NASA Astrophysics Data System (ADS)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  20. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... agreement (PLA), as they may decide appropriate, on large-scale construction projects, where the total cost... procurement. A PLA is a pre-hire collective bargaining agreement with one or more labor organizations that... the use of a project labor agreement (PLA), as they may decide appropriate, on large-scale...

  1. 40 CFR 33.301 - What does this subpart require?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... AGENCY PROGRAMS Good Faith Efforts § 33.301 What does this subpart require? A recipient, including one... good faith efforts whenever procuring construction, equipment, services and supplies under an EPA...

  2. 40 CFR 33.301 - What does this subpart require?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AGENCY PROGRAMS Good Faith Efforts § 33.301 What does this subpart require? A recipient, including one... good faith efforts whenever procuring construction, equipment, services and supplies under an EPA...

  3. 40 CFR 33.301 - What does this subpart require?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGENCY PROGRAMS Good Faith Efforts § 33.301 What does this subpart require? A recipient, including one... good faith efforts whenever procuring construction, equipment, services and supplies under an EPA...

  4. 40 CFR 33.301 - What does this subpart require?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY PROGRAMS Good Faith Efforts § 33.301 What does this subpart require? A recipient, including one... good faith efforts whenever procuring construction, equipment, services and supplies under an EPA...

  5. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  6. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  7. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  8. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  9. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  10. United States Special Operations Command (USSOCOM): Construction Management Handbook

    DTIC Science & Technology

    2010-02-11

    installation B-Hut Road Work Sea-Hut Water Well and Pump House Brick and Mortar billets D. Oversight Program Oversight of contracts is critical to the...often asked to fulfill construction requirements in austere locations with little or no training in construction terminology, concepts, and protocols...contracting arm of SOAL is the Director of Procurement (also known as SOAL-K), located within the USSOCOM Headquarters on MacDill AFB, Florida. SOAL-K

  11. Industrial application experiment series

    NASA Technical Reports Server (NTRS)

    Bluhm, S. A.

    1981-01-01

    Two procurements within the Industrial Application Experiment Series of the Thermal Power Systems Project are discussed. The first procurement, initiated in April 1980, resulted in an award to the Applied Concepts Corporation for the Capital Concrete Experiment: two Fresnel concentrating collectors will be evaluated in single-unit installations at the Jet Propulsion Laboratory Parabolic Dish Test Site and at Capitol Concrete Products, Topeka, Kansas. The second procurement, initiated in March 1981, is titled, "Thermal System Engineering Experiment B." The objective of the procurement is the rapid deployment of developed parabolic dish collectors.

  12. Construction Quality Assurance Act of 2011

    THOMAS, 112th Congress

    Rep. Maloney, Carolyn B. [D-NY-14

    2011-05-05

    House - 05/13/2011 Referred to the Subcommittee on Technology, Information Policy, Intergovernmental Relations and Procurement Reform . (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  13. Quality assurance program guidelines for application to and use by manufacturers of rail/guideway vehicles, buses, automatic train control systems, and their major subsystems

    NASA Technical Reports Server (NTRS)

    Witkin, S. A.

    1976-01-01

    Guidelines are presented for a quality assurance system to be implemented by the manufacturer in support of designing, developing, fabricating, assembling, inspecting, testing, handling, and delivery of equipment being procured for use in public urban mass transit systems. The guidelines apply to this equipment when being procured for: (1) use in revenue service; (2) demonstration of systems that will be revenue producing or used by the public; (3) use as a prototype for follow-on operational/revenue producing equipment procurements; and (4) qualification tests.

  14. Extinction of Chained Instrumental Behaviors: Effects of Procurement Extinction on Consumption Responding

    PubMed Central

    Thrailkill, Eric A.; Bouton, Mark E.

    2015-01-01

    Instrumental behavior often consists of sequences or chains of responses that minimally include procurement behaviors that enable subsequent consumption behaviors. In such chains, behavioral units are linked by access to one another and eventually to a primary reinforcer, such as food or a drug. The present experiments examined the effects of extinguishing procurement responding on consumption responding after training of a discriminated heterogeneous instrumental chain. Rats learned to make a procurement response (e.g., pressing a lever) in the presence of a distinctive discriminative stimulus; making that response led to the presentation of a second discriminative stimulus that set the occasion for a consumption response (e.g., pulling a chain), which then produced a food-pellet reinforcer. Experiment 1 showed that extinction of either the full procurement-consumption chain or procurement alone weakened the consumption response tested in isolation. Experiment 2 replicated the procurement extinction effect and further demonstrated that the opportunity to make the procurement response, as opposed to simple exposure to the procurement stimulus alone, was required. In Experiment 3, rats learned 2 distinct discriminated heterogeneous chains; extinction of 1 procurement response specifically weakened the consumption response that had been associated with it. The results suggest that learning to inhibit the procurement response may produce extinction of consumption responding through mediated extinction. The experiments suggest the importance of an associative analysis of instrumental behavior chains. PMID:25915751

  15. Professional services contract manager development and certification strategy : spr 696 : final report.

    DOT National Transportation Integrated Search

    2013-02-27

    SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...

  16. Evaluation of the towplow for Caltrans operations.

    DOT National Transportation Integrated Search

    2015-09-30

    Caltrans requested that the Advanced Highway Maintenance and Construction Technology Research Center (AHMCT) research center configure, procure, and deploy two Viking-Cives TowPlow systems and conduct an extensive evaluation to determine the most ben...

  17. 40 CFR 35.936 - Procurement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... engineering services as defined in § 35.937 and construction contracts as described in § 35.938 by grantees... does not apply to work beyond the scope of the project for which grant assistance is awarded (i.e...

  18. 40 CFR 35.936 - Procurement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... engineering services as defined in § 35.937 and construction contracts as described in § 35.938 by grantees... does not apply to work beyond the scope of the project for which grant assistance is awarded (i.e...

  19. 40 CFR 35.936 - Procurement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... engineering services as defined in § 35.937 and construction contracts as described in § 35.938 by grantees... does not apply to work beyond the scope of the project for which grant assistance is awarded (i.e...

  20. Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province

    NASA Astrophysics Data System (ADS)

    Rani, Hafnidar A.

    2016-11-01

    The possibility of errors in the process of offer price determination could be enormous, so it can affect the possibility of project underestimate cost which can impact and reduce the profit if being implementing. Government Equipment/Service Procurement Policy Institution (LKPP) assesses that the practices of cheaper price in the government equipment/service procurement are still highly found and can be potential to decrease the project quality. This study aimed to analyze the most dominant factors happened in underestimate cost offer practice, to analyze the relationship of underestimate cost offer risk factors to road construction project quality in Aceh Province and to analyze the most potential factors of underestimate cost offer risk affecting road construction project quality in Aceh Province. Road construction projects observed the projects which have been implemented in Aceh Province since 2013 - 2015. This study conducted by interviewing Government Budget Authority (KPA), and distributing the questionnaire to the road construction contractors with the qualification of K1, K2, K3, M1, M2 and B1. Based on the data from Construction Service Development Institution (LPJK) of Aceh Province on 2016, the populations obtained are 2,717 constructors. By using Slovin Equation, the research samples obtained are 97 contractors. The most dominant factors in underestimate cost offer risk of the road construction projects in Aceh Province is Contingency Cost Factor which the mean is 4.374.

  1. [Consequence of European Directive 2004/23/EC for bone banks in Germany].

    PubMed

    Pruss, A; Knaepler, H; Katthagen, B-D; Frommelt, L

    2005-11-01

    Allogenic bone grafting is an established method in revision surgery of artificial joint replacement and spinal surgery in case of bone defects. In Germany, femoral heads from living donors undergoing total hip replacement are frequently used. These grafts are processed according to the "Guidelines for the management of bone banking" issued by the Federal Medical Board. Bone grafts are drugs according to German law. Local bone banks are excluded from the regulations of the federal law on drugs [Arzneimittelgesetz (AMG) section sign 4a (4)] if certain requirements are fulfilled. The Directive 2004/23/EC of the European Parliament and of The Council on Setting Standards of Quality and Safety for the Donation, Procurement, Testing, Processing, Preservation, Storage and Distribution of Human Tissues and Cells has to be implemented into national law within 2 years. The exception of section sign 4a (4) will no longer be possible. Thus a legal construction has to be found which allows running local bone banks in compliance with the new legal settings. Three conditions will be possible: (1) a single physician procures a graft for another patient of his, (2) grafts are procured in one hospital and are used exclusively in this hospital: a license from the local authorities and a strict quality assessment according to GMP-rules is required, (3) if the grafts are distributed to other hospitals, a license from the local authorities and registration as a drug by the federal authorities are necessary.

  2. Use of Commercial ’Off-the-Shelf’ Equipment in Military Aircraft

    DTIC Science & Technology

    1976-05-01

    never been intended as a procurement document. The airline industry benefits from the standarization of equipment. Aeronautical Radio Inc. (ARINC) is...are not intended for nor are they suitable for use as procurement specifications. 2. Airframe manufacturers and commercial airlines purchase avionics...may be suitable for military procurements but a careful review must be made to ensure that the performance and environmental testing specified is

  3. 77 FR 63669 - Notice of FTA Transit Program Changes, Authorized Funding Levels and Implementation of the Moving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... Testing 11. Buy America 12. Corridor Preservation 13. Rail Car Procurements 14. Veterans Preference... transit assistance; to conduct State Safety Oversight, drug and alcohol, civil rights, procurement systems...

  4. Warranties in Weapon System Procurement: An Analysis of Practice and Theory.

    DTIC Science & Technology

    1987-04-01

    MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF SIANDARDS 1963 A fD r ILE GW cm AD-A190 933 IDA PAPER P-2024 WARRANTIES IN WEAPON SYSTEM PROCUREMENT...EPWT Essential Performance Warranty Test FAR Federal Acquisition Regulation GCS Guidance Control Section GLD Ground Laser Locator Designator GS General...Service IDA Institute for Defense Analyses I&L Installations and Logistics IPT Initial Production Test LDR Laser Designator Rangefimder MLDT Mean

  5. 40 CFR 40.145-3 - Projects involving construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... competition. “Brand name or equal” description may be used as a means to define the performance or other salient requirements of a procurement, and when so used the specific features of the named brand which...

  6. Detection performance assessment of hand-held mine detection systems in a procurement process: test set-up for MDs and MD/GPRs

    NASA Astrophysics Data System (ADS)

    Schoolderman, Arnold J.; Roosenboom, Jacques H. J.

    2005-06-01

    The Engineers Centre of Expertise of the Royal Netherlands Army (RNLA) has conducted a study on countermine in peace operations. This study, finished in 2002, concluded that the final solution to countermine will depend in the first place on better detection of buried low-metal mines, e.g. by direct detection of the explosive components in mines. Until such detection systems are available, intermediate solutions are necessary in order to assure freedom of movement in peace operations. Because countermine operations consist of a number of different activities (area preparation, detection, clearance, etc) and the suitability of the different types of available equipment depends on the scenario, the toolbox concept for countermine equipment was adopted. In 2003 a procurement process was started in order to fill this toolbox with commercial-off-the-shelf and military-off-the-shelf equipment. The paper gives a concise description of the study on countermine operations and the procurement process, and subsequently focuses on the set-up of the tests that were conducted in the framework of the procurement of hand-held mine detection systems, like metal detectors and dual-sensor mine detectors. Programs of requirements for these systems were drawn up, aiming at systems for general use and special purpose systems. Blind tests to check the compliancy to the detection performance requirements were designed and conducted in the short timeframe that was available in the procurement process. These tests are discussed in this paper, including the set-up of the test lanes, the targets used and their depths, and the role of the operator. The tests of the capability of the detectors to discriminate small targets adjacent to large targets were conducted according the guidelines of the CEN Workshop Agreement on metal detector tests. Although the results of the tests are commercially confidential, conclusions and lessons learned from the execution of these tests are presented.

  7. A Study on Market-based Strategic Procurement Planning in Convergent Supply Networks

    NASA Astrophysics Data System (ADS)

    Opadiji, Jayeola Femi; Kaihara, Toshiya

    We present a market-based decentralized approach which uses a market-oriented programming algorithm to obtain Pareto-optimal allocation of resources traded among agents which represent enterprise units in a supply network. The proposed method divides the network into a series of Walrsian markets in order to obtain procurement budgets for enterprises in the network. An interaction protocol based on market value propagation is constructed to coordinate the flow of resources across the network layers. The method mitigates the effect of product complementarity in convergent network by allowing for enterprises to hold private valuations of resources in the markets.

  8. Addendum to the Final Audit Report on Procurement of Spare Parts and Supplies

    DTIC Science & Technology

    1993-06-04

    Contraves USA, Simulation and Systems Integration, Tampa, FL Contract No.: N00104-89-G-A050-4009 Awarded: April 20, 1990 Procurement Method...awarded sole source to Contraves . The amplifier is a source-controlled item, and Contraves is the only approved source. There are no commercial...The total contract value was $69,552. Contraves assembled and tested the amplifiers. For the subject procurement, Contraves paid $* per unit for the

  9. Moving Equipment and Workers to Mine Construction Site at a Logistically Challenged Area

    NASA Astrophysics Data System (ADS)

    Tikasz, Laszlo; Biroscak, Dennis; Pentiah, Scheale Duvah; McCulloch, Robert I.

    Social sensitivity of habitants, minimal impact on the environment, low-grade infrastructure, high altitude, frequent rock slides combined with expectations for the timely moving of equipment and workers are some of the challenges emerging from the current construction of a mine. Starting with traditional planning, and experiencing issues in the early phase of the construction, a traffic simulator was requested by the Procurement Department in order to validate daily-weekly schedules and predict likely delays or blockages on the long-term.

  10. Procurement Without Problems: Preparing the RFP.

    ERIC Educational Resources Information Center

    Epstein, Susan Baerg

    1983-01-01

    Discussion of factors contributing to successful procurement of automated library system focuses on preparation of Request for Proposal (RFP) and elements included in the RFP--administrative requirements, functional requirements, performance requirements, reliability requirements, testing procedures, standardized response language, location table,…

  11. Procurement of Architectural and Engineering Services for Sustainable Buildings: A Guide for Federal Project Managers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2004-06-01

    This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section onmore » establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.« less

  12. Procurement Opportunitites in: Afghanistan and the Central Asian States (CAS)

    DTIC Science & Technology

    2012-08-01

    barriers) Furniture (office and household) Prefabricated Structures (CONEXs, containerized housing units, re-locatable buildings) Office Supplies... Concrete Foundation and Structure Road Support Activities Minor Building Renovation Water and Sewer Line and Related Construction Heavy and Civil

  13. Minority Business Enterprises and Woman Business Enterprises Grant Utilization

    EPA Pesticide Factsheets

    The policy goal of the MBE/WBE Programs is to assure that minority business enterprises and woman business enterprises are given the opportunity to participate in contract and procurement for supplies, construction, equipment & services under any EPA grant

  14. Construction site Voice Operated Information System (VOIS) test

    NASA Astrophysics Data System (ADS)

    Lawrence, Debbie J.; Hettchen, William

    1991-01-01

    The Voice Activated Information System (VAIS), developed by USACERL, allows inspectors to verbally log on-site inspection reports on a hand held tape recorder. The tape is later processed by the VAIS, which enters the information into the system's database and produces a written report. The Voice Operated Information System (VOIS), developed by USACERL and Automated Sciences Group, through a ESACERL cooperative research and development agreement (CRDA), is an improved voice recognition system based on the concepts and function of the VAIS. To determine the applicability of the VOIS to Corps of Engineers construction projects, Technology Transfer Test Bad (T3B) funds were provided to the Corps of Engineers National Security Agency (NSA) Area Office (Fort Meade) to procure and implement the VOIS, and to train personnel in its use. This report summarizes the NSA application of the VOIS to quality assurance inspection of radio frequency shielding and to progress payment logs, and concludes that the VOIS is an easily implemented system that can offer improvements when applied to repetitive inspection procedures. Use of VOIS can save time during inspection, improve documentation storage, and provide flexible retrieval of stored information.

  15. 7 CFR 1724.70 - Standard forms of contracts for borrowers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND... construction, procurement, engineering services, and architectural services financed by a loan made or... prescribes RUS procedures in promulgating electric program standard contract forms and identifies those forms...

  16. 77 FR 69627 - Information Collection; Use of Project Labor Agreements for Federal Construction Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... agencies to consider the use of a project labor agreement (PLA), as they may decide appropriate, on large... to promote economy and efficiency in Federal procurement. A PLA is a pre-hire collective bargaining...

  17. The NASA Langley building solar project and the supporting Lewis solar technology program

    NASA Technical Reports Server (NTRS)

    Ragsdale, R. G.; Namkoong, D.

    1974-01-01

    The use of solar energy to heat and cool a new office building that is now under construction is reported. Planned for completion in December 1975, the 53,000 square foot, single story building will utilize 15,000 square feet of various types of solar collectors in a test bed to provide nearly all of the heating demand and over half of the air conditioning demand. Drawing on its space-program-developed skills and resources in heat transfer, materials, and systems studies, NASA-Lewis will provide technology support for the Langley building project. A solar energy technology program underway at Lewis includes solar collector testing in an indoor solar simulator facility and in an outdoor test facility, property measurements of solar panel coatings, and operation of a laboratory-scale solar model system test facility. Based on results obtained in this program, NASA-Lewis will select and procure the solar collectors for the Langley test bed.

  18. The ITER project construction status

    NASA Astrophysics Data System (ADS)

    Motojima, O.

    2015-10-01

    The pace of the ITER project in St Paul-lez-Durance, France is accelerating rapidly into its peak construction phase. With the completion of the B2 slab in August 2014, which will support about 400 000 metric tons of the tokamak complex structures and components, the construction is advancing on a daily basis. Magnet, vacuum vessel, cryostat, thermal shield, first wall and divertor structures are under construction or in prototype phase in the ITER member states of China, Europe, India, Japan, Korea, Russia, and the United States. Each of these member states has its own domestic agency (DA) to manage their procurements of components for ITER. Plant systems engineering is being transformed to fully integrate the tokamak and its auxiliary systems in preparation for the assembly and operations phase. CODAC, diagnostics, and the three main heating and current drive systems are also progressing, including the construction of the neutral beam test facility building in Padua, Italy. The conceptual design of the Chinese test blanket module system for ITER has been completed and those of the EU are well under way. Significant progress has been made addressing several outstanding physics issues including disruption load characterization, prediction, avoidance, and mitigation, first wall and divertor shaping, edge pedestal and SOL plasma stability, fuelling and plasma behaviour during confinement transients and W impurity transport. Further development of the ITER Research Plan has included a definition of the required plant configuration for 1st plasma and subsequent phases of ITER operation as well as the major plasma commissioning activities and the needs of the accompanying R&D program to ITER construction by the ITER parties.

  19. 42 CFR 121.6 - Organ procurement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... laboratory tests and clinical examinations of potential organ donors are performed to determine any... 42 Public Health 1 2010-10-01 2010-10-01 false Organ procurement. 121.6 Section 121.6 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT ORGAN...

  20. General Services Administration Streamlines the Procurement of Construction Services

    DTIC Science & Technology

    2010-05-01

    successful. The system must be changed to increase performance, and have a sustainable performance measurement system that results in an increase...currently employ, and what is needed to employ a sustainable performance measurement system that has accompanying increase in performance and value

  1. 7 CFR 1726.201 - Formal competitive bidding.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...

  2. 7 CFR 1726.201 - Formal competitive bidding.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...

  3. 7 CFR 1726.201 - Formal competitive bidding.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...

  4. 7 CFR 1726.201 - Formal competitive bidding.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...

  5. 7 CFR 1726.201 - Formal competitive bidding.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...

  6. 7 CFR 1753.1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... unacceptable loan security risks to RUS. (4) The P&S or contract have been modified. (e) The requirements and... Telecommunications Loan Documents contain provisions regarding procurement of materials and equipment and... and procedures whenever using loan funds to purchase materials and equipment or perform construction...

  7. 7 CFR 1755.27 - Borrower contractual obligations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS, AND STANDARD CONTRACT FORMS § 1755.27 Borrower contractual obligations. (a) Loan agreement. As a condition of a loan or... pursuant to which the borrowers agree to use RUS standard contract forms for construction, procurement...

  8. Low-carbon building assessment and multi-scale input-output analysis

    NASA Astrophysics Data System (ADS)

    Chen, G. Q.; Chen, H.; Chen, Z. M.; Zhang, Bo; Shao, L.; Guo, S.; Zhou, S. Y.; Jiang, M. M.

    2011-01-01

    Presented as a low-carbon building evaluation framework in this paper are detailed carbon emission account procedures for the life cycle of buildings in terms of nine stages as building construction, fitment, outdoor facility construction, transportation, operation, waste treatment, property management, demolition, and disposal for buildings, supported by integrated carbon intensity databases based on multi-scale input-output analysis, essential for low-carbon planning, procurement and supply chain design, and logistics management.

  9. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-06-10

    Background, Issues, and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK...out of sequence and significant rework has been required, disrupting the optimal construction sequence and application of lessons learned for...concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to construction

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configurationmore » management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.« less

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.« less

  12. State Requirements for Educational Facilities, 1997.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This document updates Florida's deregulation of construction of educational facilities guidelines, while keeping as the primary focus the safety of the students in pre-K through community college facilities. Organized by the sequence of steps required in the facilities procurement process, it covers general definitions, property…

  13. 40 CFR 247.10 - Paper and paper products.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Paper and paper products. 247.10... COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS Item Designations § 247.10 Paper and paper products. Paper and paper products, excluding building and construction paper grades. ...

  14. 40 CFR 247.10 - Paper and paper products.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Paper and paper products. 247.10... COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS Item Designations § 247.10 Paper and paper products. Paper and paper products, excluding building and construction paper grades. ...

  15. Association between Organ Procurement Organization Social Network Centrality and Kidney Discard and Transplant Outcomes1

    PubMed Central

    Butala, Neel M.; King, Marissa D.; Reitsma, William; Formica, Richard N.; Abt, Peter L.; Reese, Peter P.; Parikh, Chirag R.

    2015-01-01

    Background Given growth in kidney transplant waitlists and discard rates, donor kidney acceptance is an important problem. We used network analysis to examine whether organ procurement organization (OPO) network centrality affects discard and outcomes. Methods We identified 106,160 deceased-donor kidneys recovered for transplant from 2000–2010 in SRTR. We constructed the transplant network by year with each OPO representing a node and each kidney-sharing relationship between OPOs representing a directed tie between nodes. Primary exposures were the number of different OPOs to which an OPO has given a kidney or from which an OPO has received a kidney in year preceding procurement year. Primary outcomes were discard, cold-ischemia time, delayed graft function, and 1-year graft loss. We used multivariable regression, restricting analysis to the 50% of OPOs with highest discard and stratifying remaining OPOs by kidney volume. Models controlled for kidney donor risk index, waitlist time, and kidney pumping. Results An increase in one additional OPO to which a kidney was given by a procuring OPO in a year was associated with 1.4% lower likelihood of discard for a given kidney (odds ratio, 0.986; 95% confidence interval, 0.974-0.998) among OPOs procuring high kidney volume, but 2% higher likelihood of discard (OR:1.021, CI:1.006, 1.037) among OPOs procuring low kidney volume, with mixed associations with recipient outcomes. Conclusions Our study highlights the value of network analysis in revealing how broader kidney sharing is associated with levels of organ acceptance. We conclude interventions to promote broader inter-OPO sharing could be developed to reduce discard for a subset of OPOs. PMID:26102610

  16. Environmental testing of block 2 solar cell modules

    NASA Technical Reports Server (NTRS)

    Griffith, J. S.

    1979-01-01

    The testing procedures and results of samples of the LSA Project Block 2 procurement of silicon solar cell modules are described. Block 2 was the second large scale procurement of silicon solar cell modules made by the JPL Low-cost Solar Array Project with deliveries in 1977 and early 1978. The results showed that the Block 2 modules were greatly improved over Block 1 modules. In several cases it was shown that design improvements were needed to reduce environmental test degradation. These improvements were incorporated during this production run.

  17. Marketing human organs: the autonomy paradox.

    PubMed

    Marshall, P A; Thomasma, D C; Daar, A S

    1996-03-01

    The severe shortage of organs for transplantation and the continual reluctance of the public to voluntarily donate has prompted consideration of alternative strategies for organ procurement. This paper explores the development of market approaches for procuring human organs for transplantation and considers the social and moral implications of organ donation as both a "gift of life" and a "commodity exchange." The problematic and paradoxical articulation of individual autonomy in relation to property rights and marketing human body parts is addressed. We argue that beliefs about proprietorship over human body parts and the capacity to provide consent for organ donation are culturally constructed. We contend that the political and economic framework of biomedicine, in western and non-western nations, influences access to transplantation technology and shapes the form and development of specific market approaches. Finally, we suggest that marketing approaches for organ procurement are and will be negotiated within cultural parameters constrained by several factors: beliefs about the physical body and personhood, religious traditions, economic conditions, and the availability of technological resources.

  18. Donor Indocyanine Green Clearance Test Predicts Graft Quality and Early Graft Prognosis After Liver Transplantation.

    PubMed

    Tang, Yunhua; Han, Ming; Chen, Maogen; Wang, Xiaoping; Ji, Fei; Zhao, Qiang; Zhang, Zhiheng; Ju, Weiqiang; Wang, Dongping; Guo, Zhiyong; He, Xiaoshun

    2017-11-01

    Transplantation centers have given much attention to donor availability. However, no reliable quantitative methods have been employed to accurately assess graft quality before transplantation. Here, we report that the indocyanine green (ICG) clearance test is a valuable index for liver grafts. We performed the ICG clearance test on 90 brain-dead donors within 6 h before organ procurement between March 2015 and November 2016. We also analyzed the relationship between graft liver function and early graft survival after liver transplantation (LT). Our results suggest that the ICG retention rate at 15 min (ICGR15) of donors before procurement was independently associated with 3-month graft survival after LT. The best donor ICGR15 cutoff value was 11.0%/min, and we observed a significant increase in 3-month graft failure among patients with a donor ICGR15 above this value. On the other hand, a donor ICGR15 value of ≤ 11.0%/min could be used as an early assessment index of graft quality because it provides additional information to the transplant surgeon or organ procurement organization members who must maintain or improve organ function to adapt the LT. An ICG clearance test before liver procurement might be an effective quantitative method to predict graft availability and improve early graft prognosis after LT.

  19. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the employment of minorities and women and the utilization of MBE's and FBE's in the construction and... women, by each job group. (3) Goals should be set in proportion to the group's general availability in... dissemination of information on business opportunities and procurement practices to minority and women's...

  20. 7 CFR 1717.608 - RUS approval of contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... engineering services, and in 7 CFR part 1726 for construction and procurement. (b) Large retail power contracts. RUS approval of contracts to sell electric power to retail customers is required only if the... AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Operational...

  1. 7 CFR 1717.608 - RUS approval of contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... engineering services, and in 7 CFR part 1726 for construction and procurement. (b) Large retail power contracts. RUS approval of contracts to sell electric power to retail customers is required only if the... AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Operational...

  2. 7 CFR 1717.608 - RUS approval of contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... engineering services, and in 7 CFR part 1726 for construction and procurement. (b) Large retail power contracts. RUS approval of contracts to sell electric power to retail customers is required only if the... AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Operational...

  3. 7 CFR 1726.175 - General plant materials.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false General plant materials. 1726.175 Section 1726.175... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General Plant § 1726.175 General plant... determine the procurement method that best meets its needs for purchase of general plant material and...

  4. 7 CFR 1726.175 - General plant materials.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false General plant materials. 1726.175 Section 1726.175... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General Plant § 1726.175 General plant... determine the procurement method that best meets its needs for purchase of general plant material and...

  5. 7 CFR 1726.175 - General plant materials.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false General plant materials. 1726.175 Section 1726.175... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General Plant § 1726.175 General plant... determine the procurement method that best meets its needs for purchase of general plant material and...

  6. 7 CFR 1726.175 - General plant materials.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false General plant materials. 1726.175 Section 1726.175... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General Plant § 1726.175 General plant... determine the procurement method that best meets its needs for purchase of general plant material and...

  7. INNOVATIVE FOSSIL FUEL FIRED VITRIFICATION TECHNOLOGY FOR SOIL REMEDIATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. Hnat; L.M. Bartone; M. Pineda

    2001-07-13

    This Summary Report summarizes the progress of Phases 3, 3A and 4 of a waste technology Demonstration Project sponsored under a DOE Environmental Management Research and Development Program and administered by the U.S. Department of Energy National Energy Technology Laboratory-Morgantown (DOE-NETL) for an ''Innovative Fossil Fuel Fired Vitrification Technology for Soil Remediation''. The Summary Reports for Phases 1 and 2 of the Program were previously submitted to DOE. The total scope of Phase 3 was to have included the design, construction and demonstration of Vortec's integrated waste pretreatment and vitrification process for the treatment of low level waste (LLW), TSCA/LLWmore » and mixed low-level waste (MLLW). Due to funding limitations and delays in the project resulting from a law suit filed by an environmental activist and the extended time for DOE to complete an Environmental Assessment for the project, the scope of the project was reduced to completing the design, construction and testing of the front end of the process which consists of the Material Handling and Waste Conditioning (MH/C) Subsystem of the vitrification plant. Activities completed under Phases 3A and 4 addressed completion of the engineering, design and documentation of the Material Handling and Conditioning System such that final procurement of the remaining process assemblies can be completed and construction of a Limited Demonstration Project be initiated in the event DOE elects to proceed with the construction and demonstration testing of the MH/C Subsystem.« less

  8. Department of the Army Justification of Estimates for Fiscal Year 1985. Procurement Appropriations-Construction Program Submitted to Congress February 1984. DD Forms 1391.

    DTIC Science & Technology

    1984-02-01

    REQUIREMENT FOR CONSTRUCTION PROJECT: These buildings house electronic equipment, irreplaceable rocket motor design and performance records, a...consists of five subprojects which are to provide modern facilities designed for rocket motor production. These production efficient buildings will...replace facilities which were designed and built in 1930-1942 for artillery shell loading. Four of the sub- projects are for buildings while the fifth

  9. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)« less

  10. FRIB cryogenic system status

    NASA Astrophysics Data System (ADS)

    Casagrande, F.; Ganni, V.; Knudsen, P.; Jones, S.; Sidi-Yekhlef, A.; Tatsumoto, H.; Nguyen, C.; Fila, A.; Vargas, G.; Dudley, C.; Joseph, N.; Stanley, S.; Dixon, K.; Norton, R.; Laverdure, N.; Yang, S.

    2017-12-01

    Construction and installation of the FRIB 4.5 K helium refrigeration system is nearing completion, with compressor system commissioning and 4.5 K refrigerator commissioning on schedule to occur in late 2017. The LINAC 4.5 K helium distribution system, all major process equipment, and the cryogenic distribution for the sub-systems have been procured and delivered. The sub-atmospheric cold box fabrication is planned to begin the summer of 2017, which is on schedule for commissioning in the spring of 2018. Commissioning of the support systems, such as the helium gas storage, helium purifier, and oil processor is planned to be complete by the summer of 2017. This paper presents details of the equipment procured, installation status and commissioning plans.

  11. Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

  12. Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

  13. Qualification test results for DOE solar photovoltaic flat panel procurement - PRDA 38

    NASA Technical Reports Server (NTRS)

    Griffith, J. S.

    1980-01-01

    Twelve types of prototypes modules for the DOE Photovoltaic Flat Panel Procurement (PRDA 38) were subjected to qualification tests at the Jet Propulsion Laboratory according to a new specification. Environmental exposures were carried out separately and included temperature cycling, humidity, wind simulation, and hail. The most serious problems discovered were reduced insulation resistance to ground and ground continuity of the metal frames, electrical degradation, erratic power readings, and delamination. The electrical and physical characteristics of the newly received modules are also given.

  14. 7 CFR 1753.48 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...' qualifications for all types of construction and for the required information on the bidder and subcontractors... qualified to submit bids, RUS written approval must be obtained to proceed with requesting bids. (4) Bid...) Materials on hand to be furnished by the borrower shall be released to the contractor at the start of...

  15. 40 CFR 80.1352 - What are the pre-compliance reporting requirements for the gasoline benzene program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Benzene concentration. An estimate of the average gasoline benzene concentration corresponding to the time... engineering and permitting, Procurement and Construction, and Commissioning and startup. (7) Basic information regarding the selected technology pathway for compliance (e.g., precursor re-routing or other technologies...

  16. 23 CFR 140.908 - Materials and supplies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Reimbursement for Railroad Work § 140.908 Materials and supplies. (a) Procurement. Materials and supplies, if... job, less a consideration for loss in service life at 10 percent for rails, angle bars, tie plates and... measures for restoration of affected areas as required by the physical construction or by reason of safety...

  17. 24 CFR 570.611 - Conflict of interest.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Conflict of interest. 570.611... § 570.611 Conflict of interest. (a) Applicability. (1) In the procurement of supplies, equipment, construction, and services by recipients and by subrecipients, the conflict of interest provisions in 24 CFR 85...

  18. 24 CFR 1003.606 - Conflict of interest.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Conflict of interest. 1003.606... Requirements § 1003.606 Conflict of interest. (a) Applicability. (1) In the procurement of supplies, equipment, construction, and services by grantees and subgrantees, the conflict of interest provisions in 24 CFR 85.36 and...

  19. Selling to NASA

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The prospective NASA contractor is provided with information that describes the agency and its procurement practices. Products include ideas, manufacturing capabilities, fabricated components, construction, basic materials, and specialized services. NASA assistance in marketing these and other products is emphasized. Small and minority business enterprises are discussed. The agency's scientific and technical information activities are also discussed.

  20. 75 FR 59102 - Defense Federal Acquisition Regulation Supplement; Government-Assigned Serial Number Marking...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... requires agreement between the Government and contractor prior to use of the serial numbers in constructing... Parts 211 and 252 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations... revising the introductory text to read as follows: 252.211-7007 Reporting of Government-Furnished Equipment...

  1. 48 CFR 536.271 - Project labor agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... significant project means a Federal construction project with a total cost to the Federal Government of more... framework for labor-management cooperation to advance the Government's procurement interest in cost, efficiency, and quality. (d) Policy. (1) You may, on a project-by-project basis, use a PLA on a large and...

  2. 48 CFR 752.7009 - Marking.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... sites and other project locations be suitably marked with the USAID emblem. Shipping containers are also..., marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semifinished... procurement of commodities to be shipped, and as early as possible for project construction sites and other...

  3. 48 CFR 752.7009 - Marking.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... sites and other project locations be suitably marked with the USAID emblem. Shipping containers are also..., marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semifinished... procurement of commodities to be shipped, and as early as possible for project construction sites and other...

  4. 48 CFR 752.7009 - Marking.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... sites and other project locations be suitably marked with the USAID emblem. Shipping containers are also..., marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semifinished... procurement of commodities to be shipped, and as early as possible for project construction sites and other...

  5. 48 CFR 752.7009 - Marking.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... sites and other project locations be suitably marked with the USAID emblem. Shipping containers are also..., marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semifinished... procurement of commodities to be shipped, and as early as possible for project construction sites and other...

  6. 48 CFR 752.7009 - Marking.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... sites and other project locations be suitably marked with the USAID emblem. Shipping containers are also..., marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semifinished... procurement of commodities to be shipped, and as early as possible for project construction sites and other...

  7. 48 CFR 552.236-83 - Requirement for a Project Labor Agreement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... interest and concern, including productivity, quality of work, safety, and health. (4) The PLA shall fully... cooperation to advance the Government's procurement interest in cost, efficiency, and quality. (b) The...]. The PLA binds the Contractor and subcontractors of whatever tier engaged in onsite construction work...

  8. Cell module and fuel conditioner development

    NASA Astrophysics Data System (ADS)

    Hoover, D. Q., Jr.

    1980-01-01

    Components for the first 5 cell stack (no cooling plates) of the MK-2 design were fabricated. Preliminary specfications and designs for the components of a 23 cell MK-1 stack with four DIGAS cooling plates were developed. The MK-2 was selected as a bench mark design and a preliminary design of the facilities required for high rate manufacture of fuel cell modules was developed. Two stands for testing 5 cell stacks were built and design work for modifying existing stands and building new stands for 23 and 80 cell stacks was initiated. Design and procurement of components and materials for the catalyst test stand were completed and construction initiated. Work on the specifications of pipeline gas, tap water and recovered water and definition of equipment required for treatment was initiated. An innovative geometry for the reformer was conceived and modifications of the computer program to be used in its design were stated.

  9. V/STOL tilt rotor aircraft study. Volume 2: Preliminary design of research aircraft

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A preliminary design study was conducted to establish a minimum sized, low cost V/STOL tilt-rotor research aircraft with the capability of performing proof-of-concept flight research investigations applicable to a wide range of useful military and commercial configurations. The analysis and design approach was based on state-of-the-art methods and maximum use of off-the-shelf hardware and systems to reduce development risk, procurement cost and schedules impact. The rotors to be used are of 26 foot diameter and are the same as currently under construction and test as part of NASA Tilt-Rotor Contract NAS2-6505. The aircraft has a design gross weight of 12,000 lbs. The proposed engines to be used are Lycoming T53-L-13B rated at 1550 shaft horsepower which are fully qualified. A flight test investigation is recommended which will determine the capabilities and limitations of the research aircraft.

  10. Standard spacecraft procurement analysis: A case study in NASA-DoD coordination in space programs. Ph.D. Thesis - Rand Graduate Inst.

    NASA Technical Reports Server (NTRS)

    Harris, E. D.

    1980-01-01

    The Space Test Program Standard Satellite (STPSS), a design proposed by the Air Force, and two NASA candidates, the Applications Explorer Mission spacecraft (AEM) and the Multimission Modular Spacecraft (MMS), were considered during the first phase. During the second phase, a fourth candidate was introduced, a larger, more capable AEM (L-AEM), configured by the Boeing Company under NASA sponsorship to meet the specifications jointly agreed upon by NASA and the Air Force. Total program costs for a variety of procurement options, each of which is capable of performing all of the Air Force Space Test Program missions during the 1980-1990 time period, were used as the principal measure for distinguishing among procurement options. Program cost does not provide a basis for choosing among the AEM, STPSS, and MMS spacecraft, given their present designs. The availability of the L-AEM spacecraft, or some very similar design, would provide a basis for minimizing the cost of the Air Force Space Test Program.

  11. Special Inspector General for Iraq Reconstruction: Quarterly Report and Semiannual Report to the United States Congress

    DTIC Science & Technology

    2007-07-30

    enacted November 14, 2005 • P.L. 109-148, Department of Defense, Emergency Supplemental Appropria- tions To Address Hurricanes in the Gulf of Mexico ...CEFMS IRRF NON- CONSTRUCTION THROUGH JUNE 2007 4256 W91GET-07-C-0301-NA-0001 FALCON SECURITY LTD *URI#27076* PROVIDE PERSONNEL ADN EQUIPMENT WITH... TUBERCULOSIS SCREENING EQUIPMENT FOR CTRS NC-EQUIPMENT PROCUREMENT AND MODERNIZATION NON-CONSTRUCTION $1,363,058.43 $1,363,058.43 $0.00 CEFMS IRRF NON

  12. Special Inspector General for Iraq Reconstruction. Quarterly and Semiannual Report to the United States Congress

    DTIC Science & Technology

    2007-07-30

    of Mexico , and Pandemic Influenza Act, 2006, enacted December 30, 2005 • P.L. 109-234, The Emergency Supplemental Appropriations Act for Defense...1,561,750.00 $0.00 CEFMS IRRF NON- CONSTRUCTION THROUGH JUNE 2007 4256 W91GET-07-C-0301-NA-0001 FALCON SECURITY LTD *URI#27076* PROVIDE PERSONNEL ADN EQUIPMENT... TUBERCULOSIS SCREENING EQUIPMENT FOR CTRS NC-EQUIPMENT PROCUREMENT AND MODERNIZATION NON-CONSTRUCTION $1,363,058.43 $1,363,058.43 $0.00 CEFMS IRRF

  13. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-08-02

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...has been required, disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs... NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to construction of LPD 17 Class vessels.” • “I am equally

  14. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-07-07

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...has been required, disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs... NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to construction of LPD 17 Class vessels.” • “I am equally

  15. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-10-04

    Issues, and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...rework has been required, disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs...Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to construction of LPD 17 Class vessels.” • “I am

  16. The PRIMA Test Facility: SPIDER and MITICA test-beds for ITER neutral beam injectors

    NASA Astrophysics Data System (ADS)

    Toigo, V.; Piovan, R.; Dal Bello, S.; Gaio, E.; Luchetta, A.; Pasqualotto, R.; Zaccaria, P.; Bigi, M.; Chitarin, G.; Marcuzzi, D.; Pomaro, N.; Serianni, G.; Agostinetti, P.; Agostini, M.; Antoni, V.; Aprile, D.; Baltador, C.; Barbisan, M.; Battistella, M.; Boldrin, M.; Brombin, M.; Dalla Palma, M.; De Lorenzi, A.; Delogu, R.; De Muri, M.; Fellin, F.; Ferro, A.; Fiorentin, A.; Gambetta, G.; Gnesotto, F.; Grando, L.; Jain, P.; Maistrello, A.; Manduchi, G.; Marconato, N.; Moresco, M.; Ocello, E.; Pavei, M.; Peruzzo, S.; Pilan, N.; Pimazzoni, A.; Recchia, M.; Rizzolo, A.; Rostagni, G.; Sartori, E.; Siragusa, M.; Sonato, P.; Sottocornola, A.; Spada, E.; Spagnolo, S.; Spolaore, M.; Taliercio, C.; Valente, M.; Veltri, P.; Zamengo, A.; Zaniol, B.; Zanotto, L.; Zaupa, M.; Boilson, D.; Graceffa, J.; Svensson, L.; Schunke, B.; Decamps, H.; Urbani, M.; Kushwah, M.; Chareyre, J.; Singh, M.; Bonicelli, T.; Agarici, G.; Garbuglia, A.; Masiello, A.; Paolucci, F.; Simon, M.; Bailly-Maitre, L.; Bragulat, E.; Gomez, G.; Gutierrez, D.; Mico, G.; Moreno, J.-F.; Pilard, V.; Kashiwagi, M.; Hanada, M.; Tobari, H.; Watanabe, K.; Maejima, T.; Kojima, A.; Umeda, N.; Yamanaka, H.; Chakraborty, A.; Baruah, U.; Rotti, C.; Patel, H.; Nagaraju, M. V.; Singh, N. P.; Patel, A.; Dhola, H.; Raval, B.; Fantz, U.; Heinemann, B.; Kraus, W.; Hanke, S.; Hauer, V.; Ochoa, S.; Blatchford, P.; Chuilon, B.; Xue, Y.; De Esch, H. P. L.; Hemsworth, R.; Croci, G.; Gorini, G.; Rebai, M.; Muraro, A.; Tardocchi, M.; Cavenago, M.; D'Arienzo, M.; Sandri, S.; Tonti, A.

    2017-08-01

    The ITER Neutral Beam Test Facility (NBTF), called PRIMA (Padova Research on ITER Megavolt Accelerator), is hosted in Padova, Italy and includes two experiments: MITICA, the full-scale prototype of the ITER heating neutral beam injector, and SPIDER, the full-size radio frequency negative-ions source. The NBTF realization and the exploitation of SPIDER and MITICA have been recognized as necessary to make the future operation of the ITER heating neutral beam injectors efficient and reliable, fundamental to the achievement of thermonuclear-relevant plasma parameters in ITER. This paper reports on design and R&D carried out to construct PRIMA, SPIDER and MITICA, and highlights the huge progress made in just a few years, from the signature of the agreement for the NBTF realization in 2011, up to now—when the buildings and relevant infrastructures have been completed, SPIDER is entering the integrated commissioning phase and the procurements of several MITICA components are at a well advanced stage.

  17. Sharing University Intellectual Capital: The Role of Continuing Education

    ERIC Educational Resources Information Center

    O'Neill, Hugh

    2005-01-01

    New England's research universities are widely recognized as major contributors to the region's economy. In many of the communities in which they are located, they rank among the largest employers. They purchase goods and services from New England companies, and are often among the leading procurers of construction activity. Each year, they bring…

  18. EPA Form 5700‑52A: United States Environmental Protection Agency Minority Business Enterprise/Woman Business Enterprise Utilization under Federal Grants and Cooperative Agreements

    EPA Pesticide Factsheets

    MBE/WBE utilization is based on 40 CFR Part 33. EPA Form 5700-52A must be completed by recipients of Federal grants, cooperative agreements, or other Federal financial assistance which involve procurement of supplies, equipment, construction, etc.

  19. 7 CFR 1753.48 - Procurement procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... that is estimated to cost $250,000, or less, inclusive of labor and materials. (2) The procedures to be...) Materials on hand, until released to the contractor, shall be covered by fire and either wind-storm or... construction are necessary, and the cost of such changes or corrections is properly chargeable to the borrower...

  20. 7 CFR 1753.48 - Procurement procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... that is estimated to cost $250,000, or less, inclusive of labor and materials. (2) The procedures to be...) Materials on hand, until released to the contractor, shall be covered by fire and either wind-storm or... construction are necessary, and the cost of such changes or corrections is properly chargeable to the borrower...

  1. 7 CFR 1753.48 - Procurement procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... that is estimated to cost $250,000, or less, inclusive of labor and materials. (2) The procedures to be...) Materials on hand, until released to the contractor, shall be covered by fire and either wind-storm or... construction are necessary, and the cost of such changes or corrections is properly chargeable to the borrower...

  2. 7 CFR 1753.48 - Procurement procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... that is estimated to cost $250,000, or less, inclusive of labor and materials. (2) The procedures to be...) Materials on hand, until released to the contractor, shall be covered by fire and either wind-storm or... construction are necessary, and the cost of such changes or corrections is properly chargeable to the borrower...

  3. 45 CFR 1357.32 - State fiscal requirements (title IV-B, subpart 2, family preservation and family support services).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following: Procurement; payroll; personnel functions; management, maintenance and operation of space and... SERVICES THE ADMINISTRATION ON CHILDREN, YOUTH AND FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION... title IV-B may not be used for the purchase or construction of facilities. (f) Maintenance of effort...

  4. 48 CFR 252.225-7045 - Balance of Payments Program-Construction Material Under Trade Agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty.... Designated country means— (1) A World Trade Organization Government Procurement Agreement (WTO GPA) country..., Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan (known in the World Trade...

  5. 48 CFR 252.225-7045 - Balance of Payments Program-Construction Material Under Trade Agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty.... Designated country means— (1) A World Trade Organization Government Procurement Agreement (WTO GPA) country..., Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan (known in the World Trade...

  6. 48 CFR 252.225-7045 - Balance of Payments Program-Construction Material Under Trade Agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty.... Designated country means— (1) A World Trade Organization Government Procurement Agreement (WTO GPA) country..., Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan (known in the World...

  7. A three-model comparison of the relationship between quality, satisfaction and loyalty: an empirical study of the Chinese healthcare system

    PubMed Central

    2012-01-01

    Background Previous research has addressed the relationship between customer satisfaction, perceived quality and customer loyalty intentions in consumer markets. In this study, we test and compare three theoretical models of the quality–satisfaction–loyalty relationship in the Chinese healthcare system. Methods This research focuses on hospital patients as participants in the process of healthcare procurement. Empirical data were obtained from six Chinese public hospitals in Shanghai. A total of 630 questionnaires were collected in two studies. Study 1 tested the research instruments, and Study 2 tested the three models. Confirmatory factor analysis was used to assess the scales’ construct validity by testing convergent and discriminant validity. A structural equation model (SEM) specified the distinctions between each construct. A comparison of the three theoretical models was conducted via AMOS analysis. Results The results of the SEM demonstrate that quality and satisfaction are distinct concepts and that the first model (satisfaction mediates quality and loyalty) is the most appropriate one in the context of the Chinese healthcare environment. Conclusions In this study, we test and compare three theoretical models of the quality–satisfaction–loyalty relationship in the Chinese healthcare system. Findings show that perceived quality improvement does not lead directly to customer loyalty. The strategy of using quality improvement to maintain patient loyalty depends on the level of patient satisfaction. This implies that the measurement of patient experiences should include topics of importance for patients’ satisfaction with health care services. PMID:23198824

  8. A three-model comparison of the relationship between quality, satisfaction and loyalty: an empirical study of the Chinese healthcare system.

    PubMed

    Lei, Ping; Jolibert, Alain

    2012-11-30

    Previous research has addressed the relationship between customer satisfaction, perceived quality and customer loyalty intentions in consumer markets. In this study, we test and compare three theoretical models of the quality-satisfaction-loyalty relationship in the Chinese healthcare system. This research focuses on hospital patients as participants in the process of healthcare procurement. Empirical data were obtained from six Chinese public hospitals in Shanghai. A total of 630 questionnaires were collected in two studies. Study 1 tested the research instruments, and Study 2 tested the three models. Confirmatory factor analysis was used to assess the scales' construct validity by testing convergent and discriminant validity. A structural equation model (SEM) specified the distinctions between each construct. A comparison of the three theoretical models was conducted via AMOS analysis. The results of the SEM demonstrate that quality and satisfaction are distinct concepts and that the first model (satisfaction mediates quality and loyalty) is the most appropriate one in the context of the Chinese healthcare environment. In this study, we test and compare three theoretical models of the quality-satisfaction-loyalty relationship in the Chinese healthcare system. Findings show that perceived quality improvement does not lead directly to customer loyalty. The strategy of using quality improvement to maintain patient loyalty depends on the level of patient satisfaction. This implies that the measurement of patient experiences should include topics of importance for patients' satisfaction with health care services.

  9. Assessing bone banking activities at University of Malaya medical centre.

    PubMed

    Mohd, Suhaili; Samsuddin, Sharifah Mazni; Ramalingam, Saravana; Min, Ng Wuey; Yusof, Norimah; Zaman, T Kamarul; Mansor, Azura

    2015-12-01

    The main advantage of establishing in-house bone banks is its ability to readily provide allograft bones for local surgeries. Bone procurement activities of our university bone bank during the 10 years of operation were reviewed. Socio-demographic data of donors, types of bone procured, cases of rejected bones and types of allograft bones transplanted are presented. From 179 potential donors, 73 % were accepted with 213 procured bones. Femoral head was the common bone transplanted (45 %), as it was also the most common procured (82 %). Bones were rejected mainly due to non-technical reasons (83 %) rather than positive results of microbiological (13 %) and serological (4 %) tests. Comprehensive data could not be obtained for further analysis due to difficulties in retrieving information. Therefore, quality assurance system was improved to establish more systematic documentations, as the basis of good banking practice with process control hence allowing traceability.

  10. Prophylactic Procurement of University Students in Southern Ethiopia: Stigma and the Value of Condom Machines on Campus

    PubMed Central

    Wells, Christopher J.; Alano, Abraham

    2013-01-01

    Introduction Risky sexual behavior among Ethiopian university students, especially females, is a major contributor to young adult morbidity and mortality. Ambaw et al. found that female university students in Ethiopia may fear the humiliation associated with procuring condoms. A study in Thailand suggests condom machines may provide comfortable condom procurement, but the relevance to a high-risk African context is unknown. The objective of this study was to examine if the installation of condom machines in Ethiopia predicts changes in student condom uptake and use, as well as changes in procurement related stigma. Methods Students at a large urban university in Southern Ethiopia completed self reported surveys in 2010 (N  = 2,155 surveys) and again in 2011 (N =  2,000), six months after the installation of condom machines. Mann-Whitney and Chi-square tests were conducted to evaluate significant changes in student sexual behavior, as well as condom procurement and associated stigma over the subsequent one year period. Results After installing condom machines, the average number of trips made to procure condoms on-campus significantly increased 101% for sexually active females and significantly decreased 36% for sexually active males. Additionally, reports of condom use during last sexual intercourse showed a non-significant 4.3% increase for females and a significant 9.0% increase for males. During this time, comfort procuring condoms and ability to convince sexual partners to use condoms were significantly higher for sexually active male students. There was no evidence that the condom machines led to an increase in promiscuity. Conclusions The results suggest that condom machines may be associated with more condom procurement among vulnerable female students in Ethiopia and could be an important component of a comprehensive university health policy. PMID:23565272

  11. User evaluation of photovoltaic-powered vaccine refrigerator/freezer systems

    NASA Technical Reports Server (NTRS)

    Ratajczak, Anthony F.

    1987-01-01

    The NASA Lewis Research Center has concluded a project to develop and field test photovoltaic-powered refrigerator/freezers for vaccine storage in remote areas of developing countries. As a conclusion to this project, questionnaires were sent to the in-country administrators for each test site probing user acceptance of the systems and attitudes regarding procurement of additional systems. Responses indicate that the systems had a positive effect on the local communities, that they made a positive impression on the local health authorities, and that system cost and scarcity of funds are the major barriers to procurements of additional systems.

  12. User evaluation of photovoltaic-powered vaccine refrigerator/freezer systems

    NASA Astrophysics Data System (ADS)

    Ratajczak, Anthony F.

    1987-03-01

    The NASA Lewis Research Center has concluded a project to develop and field test photovoltaic-powered refrigerator/freezers for vaccine storage in remote areas of developing countries. As a conclusion to this project, questionnaires were sent to the in-country administrators for each test site probing user acceptance of the systems and attitudes regarding procurement of additional systems. Responses indicate that the systems had a positive effect on the local communities, that they made a positive impression on the local health authorities, and that system cost and scarcity of funds are the major barriers to procurements of additional systems.

  13. Results of module electrical measurement of the DOE 46-kilowatt procurement

    NASA Technical Reports Server (NTRS)

    Curtis, H. B.

    1978-01-01

    Current-voltage measurements have been made on terrestrial solar cell modules of the DOE/JPL Low Cost Silicon Solar Array procurement. Data on short circuit current, open circuit voltage, and maximum power for the four types of modules are presented in normalized form, showing distribution of the measured values. Standard deviations from the mean values are also given. Tests of the statistical significance of the data are discussed.

  14. Annexin II-Dependent Mechanism of Breast Cancer Progression

    DTIC Science & Technology

    2010-11-01

    of the effects of tranexamic acid and urokinase on metastasis of Lewis lung carcinoma. Br. J. Cancer 46, 428–435. Tarui, T., et al., 2002. Plasmin...Lysine–Sepharose and ε- aminocaproic acid (ε-ACA)were procured from Sigma (St. Louis, MO). Chromatography and electrophoretic reagents were procured from...μl) with medium containing 10% fetal bovine serum (FBS). Test reagents (plasminogen, plasmin, angiostatin, ε-aminocaproic acid , or antibo- dies) were

  15. Selection, procurement and description of Salem Limestone samples used to study the effects of acid rain

    NASA Astrophysics Data System (ADS)

    Ross, M.; Knab, L.

    1984-07-01

    The selection, procurement, and description of the Salem Limestone to be used in field exposure tests to assess the effects of acid rain on building stone are described. The rationale for choosing Salem Limestone is given and a brief geological description of the stone is provided. Preparation of the stone samples for field exposure, including cutting, surface finishing and labelling is presented.

  16. Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study

    NASA Astrophysics Data System (ADS)

    Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan

    2010-05-01

    Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.

  17. The PNC-CAT insertion device beamline at the Advanced Photon Source

    NASA Astrophysics Data System (ADS)

    Heald, S. M.; Stern, E. A.; Brown, F. C.; Kim, K. H.; Barg, B.; Crozier, E. D.

    1996-09-01

    The PNC-CAT is a consortium of Pacific Northwest institutions formed to instrument a sector (number 20) at the Advanced Photon Source (APS). Research is planned in a variety of areas, with an emphasis on environmentally based problems. The insertion device beamline is based on the APS undulator A and will be optimized for producing microbeams as well as for applications requiring energy scanning capabilities. This paper describes the basic layout and some special features of the beamline. Two experimental stations are planned: one general purpose and one dedicated to MBE and surface science problems. Both tapered capillaries and Kirkpatrick-Baez optics will be used for producing microbeams, and a large optical bench is planned for the main station to allow for easy accommodation of new optics developments. Design calculations and initial capillary tests indicate that flux densities exceeding 1011 photons/sec/mm2 should be achievable. All major components are under construction or in procurement, and initial testing is planned for late 1996.

  18. 76 FR 68027 - Federal Acquisition Regulation; Certification Requirement and Procurement Prohibition Relating to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    .... Applicability to Construction Comment: One respondent was concerned that the prescription at FAR 25.1103, which.... 121(c); 10 U.S.C. chapter 137; and 42 U.S.C. 2473(c). 0 2. Amend section 25.1103 by revising paragraph (e) to read as follows: 25.1103 Other provisions and clauses. * * * * * (e) The contracting officer...

  19. Evaluating All-Metal Valves for Use in a Tritium Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Houk, L.; Payton, A.

    In the tritium gas processing system, it is desired to minimize polymer components due to their degradation from tritium exposure (beta decay). One source of polymers in the tritium process is valve components. A vendor has been identified that manufactures a valve that is marketed as being made from all-metal construction. This manufacturer, Ham-Let Group, manufactures a diaphragm valve (3LE series) that claims to be made entirely of metal. SRNL procured twelve (12) Ham-Let diaphragm valves for characterization and evaluation. The characterization tests include identification of the maximum pressure of these valves by performing pressure and burst tests. Leak testsmore » were performed to ensure the valves do not exceed the acceptable leak rate for tritium service. These valves were then cycled in a nitrogen gas and/or vacuum environment to ensure they would be durable in a process environment. They were subsequently leak tested per ASTM protocol to ensure that the valves maintained their leak tight integrity. A detailed material analysis was also conducted to determine hydrogen and tritium compatibility.« less

  20. CFM technologies for space transportation: Multipurpose hydrogen testbed system definition and tank procurement

    NASA Technical Reports Server (NTRS)

    Fox, E. C.; Kiefel, E. R.; Mcintosh, G. L.; Sharpe, J. B.; Sheahan, D. R.; Wakefield, M. E.

    1993-01-01

    The development of a test bed tank and system for evaluating cryogenic fluid management technologies in a simulated upper stage liquid hydrogen tank is covered. The tank is 10 ft long and is 10 ft in diameter, and is an ASME certified tank constructed of 5083 aluminum. The tank is insulated with a combination of sprayed on foam insulation, covered by 45 layers of double aluminized mylar separated by dacron net. The mylar is applied by a continuous wrap system adapted from commercial applications, and incorporates variable spacing between the mylar to provide more space between those layers having a high delta temperature, which minimizes heat leak. It also incorporates a unique venting system which uses fewer large holes in the mylar rather than the multitude of small holes used conventionally. This significantly reduces radiation heat transfer. The test bed consists of an existing vacuum chamber at MSFC, the test bed tank and its thermal control system, and a thermal shroud (which may be heated) surrounding the tank. Provisions are made in the tank and chamber for inclusion of a variety of cryogenic fluid management experiments.

  1. Department of the Air Force Justification of Estimates for Fiscal Year 1981, Submitted to Congress January 1980, Aircraft Procurement, Air Force, Missile Procurement, Air Force, Other Procurement, Air Force.

    DTIC Science & Technology

    1980-01-01

    10-0 6 EL4 -022 8L LLý 0 0 a 0 CLcc - 3 E CL 0 ;i *1 XO go10 ,* . , -8 rt -C CL.* L. OLc L ’i go 0 0 0 L +1%- 00 00I :) I.- I - - 51 .0 Cc a,,0 c0...of Test Cells M34 and M35. The bldg will be a prefabri- cated steel structure with several work stations. The work stations will have hoist systems...mate/demate the engine to its mount. The work stations will incorporate cell type interfaces for a limited checkout of engine in- strumentation. These

  2. Application of multi-criteria decision analysis in selecting of sustainable investments

    NASA Astrophysics Data System (ADS)

    Kozik, Renata

    2017-07-01

    Investors of construction projects, especially financed with public money, quite slowly adapt environmentally friendly solutions, e.g. passive buildings. Practice shows that the use of green public procurement among the public investors is negligible. Energy-saving technologies and equipment are expensive at the construction phase and investors less or not at all take into account the future operating costs. The aim of this article is to apply the method of multi-criteria analysis ELECTRE to select the best investment in terms of cost of implementation, operation, as well as the impact on the environment.

  3. The interplay between academic performance and quality of life among preclinical students.

    PubMed

    Shareef, Mohammad Abrar; AlAmodi, Abdulhadi A; Al-Khateeb, Abdulrahman A; Abudan, Zainab; Alkhani, Mohammed A; Zebian, Sanderlla I; Qannita, Ahmed S; Tabrizi, Mariam J

    2015-10-31

    The high academic performance of medical students greatly influences their professional competence in long term career. Meanwhile, medical students greatly demand procuring a good quality of life that can help them sustain their medical career. This study examines validity and reliability of the tool among preclinical students and testifies the influence of their scholastic performance along with gender and academic year on their quality of life. A cross sectional study was conducted by distributing World Health Organization Quality of Life, WHOQOL-BREF, survey among medical students of year one to three at Alfaisal University. For validity, item discriminate validity(IDV) and confirmatory factor analysis were measured and for reliability, Cronbach's α test and internal item consistency(IIC) were examined. The association of GPA, gender and academic year with all major domains was drawn using Pearson's correlation, independent samples t-test and one-way ANOVA, respectively. A total of 335 preclinical students have responded to this questionnaire. The construct has demonstrated an adequate validity and good reliability. The high academic performance of students positively correlated with physical (r = 0.23, p < 0.001), psychological health (r = 0.29, p < 0.001), social relations (r = 0.11, p = 0.03) and environment (r = 0.23, p < 0.001). Male student scored higher than female peers in physical and psychological health. This study has identified a direct relationship between the academic performance of preclinical students and their quality of life. The WHOQOL-BREF is a valid and reliable tool among preclinical students and the positive direction of high academic performance with greater QOL suggests that academic achievers procure higher satisfaction and poor achievers need a special attention for the improvement of their quality of life.

  4. The Quantitative Analysis of Chennai Automotive Industry Cluster

    NASA Astrophysics Data System (ADS)

    Bhaskaran, Ethirajan

    2016-07-01

    Chennai, also called as Detroit of India due to presence of Automotive Industry producing over 40 % of the India's vehicle and components. During 2001-2002, the Automotive Component Industries (ACI) in Ambattur, Thirumalizai and Thirumudivakkam Industrial Estate, Chennai has faced problems on infrastructure, technology, procurement, production and marketing. The objective is to study the Quantitative Performance of Chennai Automotive Industry Cluster before (2001-2002) and after the CDA (2008-2009). The methodology adopted is collection of primary data from 100 ACI using quantitative questionnaire and analyzing using Correlation Analysis (CA), Regression Analysis (RA), Friedman Test (FMT), and Kruskall Wallis Test (KWT).The CA computed for the different set of variables reveals that there is high degree of relationship between the variables studied. The RA models constructed establish the strong relationship between the dependent variable and a host of independent variables. The models proposed here reveal the approximate relationship in a closer form. KWT proves, there is no significant difference between three locations clusters with respect to: Net Profit, Production Cost, Marketing Costs, Procurement Costs and Gross Output. This supports that each location has contributed for development of automobile component cluster uniformly. The FMT proves, there is no significant difference between industrial units in respect of cost like Production, Infrastructure, Technology, Marketing and Net Profit. To conclude, the Automotive Industries have fully utilized the Physical Infrastructure and Centralised Facilities by adopting CDA and now exporting their products to North America, South America, Europe, Australia, Africa and Asia. The value chain analysis models have been implemented in all the cluster units. This Cluster Development Approach (CDA) model can be implemented in industries of under developed and developing countries for cost reduction and productivity increase.

  5. Information sharing model in supporting implementation of e-procurement service: Case of Bandung city

    NASA Astrophysics Data System (ADS)

    Ramantoko, Gadang; Irawan, Herry

    2017-10-01

    This research examines the factors influencing the Information Sharing Model in Supporting Implementation of e-Procurement Services: Case of Bandung City in its early maturity stage. The early maturity of information sharing stage was determined using e-Government Maturity Stage Conceptual Framework from Estevez. Bandung City e-Procurement Information Sharing system was categorized at stage 1 in Estevez' model where the concern was mainly on assessing the benefit and risk of implementing the system. The Authors were using DeLone & McLean (D&M) Information System Success model to study benefit and risk of implementing the system in Bandung city. The model was then empirically tested by employing survey data that was collected from the available 40 listed supplier firms. D&M's model adjusted by Klischewski's description was introducing Information Quality, System Quality, and Service Quality as independent variable; Usability and User Satisfaction as intermediate dependent variable; and Perceived Net Benefit as final dependent variable. The findings suggested that, all of the predictors in D&M's model significantly influenced the net perceived benefit of implementing the e-Procurement system in the early maturity stage. The theoretical contribution of this research suggested that D&M's model might find useful in modeling complex information technology successfulness such as the one used in e-Procurement service. This research could also have implications for policy makers (LPSE) and system providers (LKPP) following the introduction of the service. However, the small number of respondent might be considered limitation of the study. The model needs to be further tested using larger number of respondents by involving the population of the firms in extended boundary/municipality area around Bandung.

  6. The NASA Experience

    NASA Technical Reports Server (NTRS)

    Ramos, Alberto

    2011-01-01

    Projects assigned to: (1) Testing, fixing, and procuring enclosure systems and components for Kennedy Ground Controls Systems at launch pad B. (2) Organizational spreadsheets for all subsystems involved in the project. (Procurement, parts lists, drawings, purchase requests, etc) (3) Resolve is a project devoted to the lunar rover that will sample lunar soil in an effort to remove the moister and separate the metal from the oxygen to produce drinkable water. I helped with the humidity environmental generator for the experiment (moister detector).

  7. Characterization Tests of WFC3 Filters

    NASA Technical Reports Server (NTRS)

    Baggett, S.; Boucarut, R.; Telfer, R.; Quijano, J. Kim; Quijada, M.; Arsenovic, P.; Brown, T.; Dailey, M.; Figer, D.; Hilbert, B.

    2006-01-01

    The WFC3 instrument to be installed on HST during the next servicing mission consists of a UVIS and an IR channel. Each channel is allocated its own complement of filters: 48 elements for the UVIS (42 filters, 5 quads, and 1 UV grism) and 17 slots for the IR (15 filters and 2 grisms). While a majority of the UVIS filters exhibit excellent performance consistent with or exceeding expectations, a subset show significant filter ghosts. Procurement of improved replacement filters is in progress and a summary of the characterization tests being performed on the new filters is presented. In the IR channel, while no filter ghosting was detected in any of the filters during thermal vacuum testing, the grisms were found to be installed incorrectly; they have been removed and will be reinstalled. In addition, due to the significantly improved response blueward of 800nm expected in the new substrate-removed IR detector (see Invited talk by R.A.Kimble, this volume), two IR filters originally constructed on a fused silica substrate are being remade using an IR transmitting color glass to block any visible light transmission. Tests of the new IR filters and preparations for the grism reinstallation are summarized

  8. A commercial project for private investments. Update of the 280 MW api Energia IGCC plant construction in central Italy.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Del Bravo, R.; Pinacci, P.; Trifilo, R.

    1998-07-01

    This paper has the aim to give a general overview of the api Energia IGCC project starting from the project background in 1992 and ending with the progress of construction. api Energia S.p.A., a joint VENTURE between api anonima petroli italiana S.p.A., Roma, Italy (51%), ABB Sae Sadelmi S.p.A., Milano, Italy (25%) and Texaco Development Corporation (24%), is building a 280 MW Integrated Gasification Combined Cycle plant in the api refinery at Falconara Marittima, on Italy' s Adriatic coast, using heavy oil residues. The plant is based on the modern concept of employing a highly efficient combined cycle power plantmore » fed with a low heating value fuel gas produced by gasifying heavy refinery residues. This scheme provides consistent advantages in terms of efficiency and environmental impact over alternative applications of the refinery residues. The electric power produced will feed the national grid. The project has been financed using the ``project financing'' scheme: over 1,000 billion Lira, representing 75% of the overall capital requirement, have been provided by a pool of international banks. In November 1996 the project reached financial closure and immediately after the detailed design and procurement activities started. Engineering, Procurement and Construction activities, carried out by a Consortium of companies of the ABB group, are totally in line with the schedule. Commercial operation of the plant, is scheduled for November 1999.« less

  9. Title I preliminary engineering for: A. S. E. F. solid waste to methane gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1976-01-01

    An assignment to provide preliminary engineering of an Advanced System Experimental Facility for production of methane gas from urban solid waste by anaerobic digestion is documented. The experimental facility will be constructed on a now-existing solid waste shredding and landfill facility in Pompano Beach, Florida. Information is included on: general description of the project; justification of basic need; process design; preliminary drawings; outline specifications; preliminary estimate of cost; and time schedules for design and construction of accomplishment of design and construction. The preliminary cost estimate for the design and construction phases of the experimental program is $2,960,000, based on Dec.more » 1975 and Jan. 1976 costs. A time schedule of eight months to complete the Detailed Design, Equipment Procurement and the Award of Subcontracts is given.« less

  10. The cost risk implementation on design-build project of integrated public spaces child friendly in capital of Jakarta

    NASA Astrophysics Data System (ADS)

    Mardiaman, Mubarok, Abdul

    2017-11-01

    Jakarta area of 662.33 km2 with a population of 10,075,030 inhabitants and green open spaces 9.98%. The Jakarta government built a child-friendly integrated open space as facilities for playing. Providing of facilities was hoped suitable with time, cost, quality, accountability and proper financial governance. Based on the PU ministerial regulation number 19/PRT/M/2015 on the standards and guidelines for procurement the design and construction work on the integrated build and the PU ministerial regulation No. 07/PRT/M/2011 on standards and guidelines for procurement of construction works and consulting services of public works and the ministry of housing. RPTRA development at 123 locations in Jakarta was implemented base on the contract of design and build. The design study was influenced by the cost elements; the main strength (expert), skilled personnel, support personnel, major equipment and support. The construction fee relies on; expert implementation, hardware implementation, preparation work, land, buildings, courtyards, fences, complementary and governance capabilities for human resources in completing the construction activities to minimize the cost risk. Montecarlo simulations was conducted to determine the average unit price, model and analyze systems. In the cost contract, the percentage of design work stipulated 2.5%, build 97.5%. Base on regulation the minister of public work for design work cost 2.72%, build 97.28%. Then, actual cost for design 2.67% and build 97.33%. From the three reference was shown that there are differentiation one another. The acceleration of planning able to make the cost and time more efficient that impact on the implementation margin.

  11. Status of the Perpendicular Biased 2nd Harmonic Cavity for the Fermilab Booster

    DOE PAGES

    Tan, C. Y.; Dey, J. E.; Duel, K. L.; ...

    2017-05-01

    This is a status report on the 2nd harmonic cavity for the Fermilab Booster as part of the Proton Improvement Plan (PIP) for increasing beam transmission efficiency, and thus reducing losses. A set of tuner rings has been procured and is undergoing quality control tests. The Y567 tube for driving the cavity has been successfully tested at both injection and extraction frequencies. A cooling scheme for the tuner and cavity has been developed after a thorough thermal analysis of the system. RF windows have been procured and substantial progress has been made on the mechanical designs of the cavity andmore » the bias solenoid. Finally, the goal is to have a prototype cavity ready for testing by the end of 2017.« less

  12. Status of the Perpendicular Biased 2nd Harmonic Cavity for the Fermilab Booster

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tan, C. Y.; Dey, J. E.; Duel, K. L.

    This is a status report on the 2nd harmonic cavity for the Fermilab Booster as part of the Proton Improvement Plan (PIP) for increasing beam transmission efficiency, and thus reducing losses. A set of tuner rings has been procured and is undergoing quality control tests. The Y567 tube for driving the cavity has been successfully tested at both injection and extraction frequencies. A cooling scheme for the tuner and cavity has been developed after a thorough thermal analysis of the system. RF windows have been procured and substantial progress has been made on the mechanical designs of the cavity andmore » the bias solenoid. Finally, the goal is to have a prototype cavity ready for testing by the end of 2017.« less

  13. The Application of Quantity Discounts in Army Procurements (Field Test).

    DTIC Science & Technology

    1980-04-01

    Work Directive (PWD). d. The amended PWD is forwarded to the Procurement and Production (PP) control where quantity increments and delivery schedules are...counts on 97 Army Stock Fund small purchases (less than $10,000) and received 10 I be * 0p cebe * )~ Cb 111 cost effective discounts on 46 or 47.4% of...discount but the computed annualized cost for the QD increment was larger than the computed annualized cost for the EOQ, this was not a cost effective

  14. Standard spacecraft economic analysis. Volume 2: Findings and conclusions

    NASA Technical Reports Server (NTRS)

    Harris, E. D.; Large, J. P.

    1976-01-01

    The comparative program costs associated with use of various standardized spacecraft for Air Force space test program missions to be flown on the space shuttle were studied in two phases. In the first phase, a variety of procurement mixes composed of existing or programmed NASA standard spacecraft designs and an Air Force standard spacecraft design were considered. The second phase dealt with additional procurement options using an upgraded version of an existing NASA design. The results of both phases are discussed.

  15. Management and Capability ot the Major Range and Test Facility Bases

    DTIC Science & Technology

    1995-07-27

    The audit objective was to evaluate management oversight provided to the test ranges and determine whether management oversight could be streamlined... The audit also evaluated whether program managers were procuring test resources that already existed at the test ranges. Management controls related to the objectives were also evaluated.

  16. Direct procurement of wound management products.

    PubMed

    Jenkins, Trevor

    2014-03-01

    This article describes a collaborative project between Bedfordshire Community Health Services and Primary Care Trusts/Clinical Commissioning Groups to improve provision of dressings to nurses for the patients they treat. Commissioners have facilitated a transformational approach and encouraged development of efficient systems of increased cost-effectiveness rather than a transactional approach based on opportunistic cost improvement plans. Reconfiguration to direct procurement from GP prescribing has reduced wastage, released nurse time from processes to spend on clinical contact time with patients, increased efficiency, and reduced prescription workload for GPs, all without adverse effects on expenditure. Establishing a wound care products formulary placed control under the nurses treating patients and facilitated decision-making based on cost-effectiveness in clinical use. Nurses now manage 60% of expenditure in the local community health economy, and this is increasing. Relationships with the dressings manufacturing industry have also changed in a positive, constructive direction.

  17. Goddard Space Flight Center specification for Helical-Scan 8-millimeter (mm) magnetic digital data tape cartridge

    NASA Technical Reports Server (NTRS)

    Perry, Jimmy L.

    1992-01-01

    The same kind of standard and controls are established that are currently in use for the procurement of new analog, digital, and IBM/IBM compatible 3480 tape cartridges, and 1 in wide channel video magnetic tapes. The Magnetic Tape Certification Facility (MTCF) maintains a Qualified Products List (QPL) for the procurement of new magnetic media and uses the following specifications for the QPL and Acceptance Tests: (1) NASA TM-79724 is used for the QPL and Acceptance Testing of new analog magnetic tapes; (2) NASA TM-80599 is used for the QPL and Acceptance Testing of new digital magnetic tapes; (3) NASA TM-100702 is used for the QPL and Acceptance Testing of new IBM/IBM compatible 3840 magnetic tape cartridges; and (4) NASA TM-100712 is used for the QPL and Acceptance Testing of new 1 in wide channel video magnetic tapes. This document will be used for the QPL and Acceptance Testing of new Helical Scan 8 mm digital data tape cartridges.

  18. Benchmarking organ procurement organizations: a national study.

    PubMed Central

    Ozcan, Y A; Begun, J W; McKinney, M M

    1999-01-01

    OBJECTIVE: An exploratory examination of the technical efficiency of organ procurement organizations (OPOs) relative to optimal patterns of production in the population of OPOs in the United States. DATA SOURCES: A composite data set with the OPO as the unit of analysis, constructed from a 1995 national survey of OPOs (n = 64), plus secondary data from the Association of Organ Procurement Organizations and the United Network for Organ Sharing. STUDY DESIGN: The study uses data envelopment analysis (DEA) to evaluate the technical efficiency of all OPOs. PRINCIPAL FINDINGS: Overall, six of the 22 larger OPOs (27 percent) are classified as inefficient, while 23 of the 42 smaller OPOs (55 percent) are classified as inefficient. Efficient OPOs recover significantly more kidneys and extrarenal organs; have higher operating expenses; and have more referrals, donors, extrarenal transplants, and kidney transplants. The quantities of hospital development personnel and other personnel, and formalization of hospital development activities in both small and large OPOs, do not significantly differ. CONCLUSIONS: Indications that larger OPOs are able to operate more efficiently relative to their peers suggest that smaller OPOs are more likely to benefit from technical assistance. More detailed information on the activities of OPO staff would help pinpoint activities that can increase OPO efficiency and referrals, and potentially improve outcomes for large numbers of patients awaiting transplants. PMID:10536974

  19. Department of the Army Justification of Estimates for Fiscal Years 1988/1989. Procurement/Appropriations-Construction Program Submitted to Congress.

    DTIC Science & Technology

    1987-01-01

    e4run stoag :ahbl’ -ss to -ervice the, IDS equipment a-nd1 tho liFr . F)- fencing ;haill bo prov.id-d iroun,! the IDS area with necessary gats nd roa1d I...will provide enhanced and expanded capabilities. The EMCS (with 2,000 points) will control package boilers at 24 locations, one furnace, chiller

  20. A Systems Approach to Military Construction.

    DTIC Science & Technology

    1982-11-01

    Unclassi fled I150. OECL ASSI F1C ATI ON/ DOWNGRADING I SCHEDULE IS. DISYR1EUTION STATEMENT (ot this Repo"t) Approved for public release; distribution...30 Procurement Alternatives 30 Design Alternatives 33 Preconcept Control Data 34 AE Selection Procedure 36 Scheduling 40 Cost Estimating 44 4...data, scheduling , and cost estimating. The objectives of project coordination for a systems-oriented project do not differ from those of a

  1. Stakeholder Alignment for Requirements in GEOValue

    NASA Astrophysics Data System (ADS)

    Cutcher-Gershenfeld, J.; King, J. L.

    2016-12-01

    Observation systems that collect information on environmental parameters relevant to biological and physical earth resources provide value. This has been demonstrated so many times in so many ways that it is not worth deliberating. Earlier projects for research (whether it is possible to do this or that), or for "dual use," typically involving defense, have been successful. Wealthy parties have built their own systems. Less wealthy parties seek to sustain the systems they have built. The history of systems suggests that "requirements" will be the next step. The objective is to maximize the "return" on the substantial investment required for construction, deployment, maintenance and renewal of observation systems. Stakeholders and their interests are assessed to construct the requirements from which specifications are built. Specifications drive procurement, and procurement produces built systems. Complicated (e.g. space-based) systems have long times between requirements analysis and deployment. It all depends on getting the requirements right, which depends on understanding stakeholders and requirements. And this is where things get complicated. Stakeholders and interests change, sometimes rapidly, as what is possible is altered. It becomes increasingly difficult to achieve stakeholder alignment required for effective management of constituent politics at the heart of any expensive endeavor. This paper presents results from a major study of stakeholder alignment in the Earth Sciences, focused especially on EarthCube.

  2. Calibration of a magnetic induction system for measurement of hypervelocities

    NASA Astrophysics Data System (ADS)

    Breeze, S. P.

    1993-03-01

    A device to measure the velocity and to determine the character of a material launched in a flight tube during the execution of an experiment has been constructed. This measurement device provides a self generating signal, is nonintrusive, compact, and accurate. The signals are reproducible, and it is relatively inexpensive to procure. The MAgnetic Velocity Induction System (MAVIS) has been the technique used to measure projectile velocities in the two-stage light gas gun at Sandia for many years. Several experiments were conducted to study the MAVIS data signatures produced by various metal projectiles at velocities raging from 0.8 km/sec to nearly 7.0 km/sec, as well as fragmented metal projectiles, and a highly conductive carbon plasma. This report deals with the results of those calibration experiments. The data signature study may be used as an aid in the interpretation of the other test data records.

  3. Variable Cost to Procure

    DTIC Science & Technology

    1981-03-12

    Procurement Work Directive ( PWV ) Procurement Army, CostL to Procure Cost Differential Secondary (PAS) Cost to Buy Economic Order Quantity Procurement...and Assignment of Buyer h. Solicitation Fffort . ) (1) Procurement Planning ( ) ( ) (?) PWV Review and Small Business Coordination ( (3) Determination

  4. 241-AZ-101 Waste Tank Color Video Camera System Shop Acceptance Test Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WERRY, S.M.

    2000-03-23

    This report includes shop acceptance test results. The test was performed prior to installation at tank AZ-101. Both the camera system and camera purge system were originally sought and procured as a part of initial waste retrieval project W-151.

  5. Improving donation outcomes: hospital development and the Rapid Assessment of Hospital Procurement Barriers in Donation.

    PubMed

    Siminoff, Laura A; Traino, Heather M

    2009-06-01

    Deficiencies in the donation process continue to contribute to the shortage of organs available for transplant. Continuous quality improvement of hospitals' donation processes is needed to identify and correct the problems. To test the Rapid Assessment of Hospital Procurement Barriers in Donation (RAPiD), a direct observation technique with a focused ethnographic strategy, for assessing hospitals' donation processes and identifying areas in need of continuous quality improvement interventions. A pre-post assessment of hospitals' barriers to patient identification and referral, and family consent to donation. Seventeen hospitals within the catchment area of a Northeastern organ procurement organization were assessed by using the RAPiD method. Hospital administrators, health care providers, and staff (N = 537) were interviewed as part of the assessments. Interventions, including on-site training and education, and the use of in-house coordinators, were specifically tailored to each hospital's unique set of barriers to donation. The interventions were delivered to the hospitals in the form of recommendations. The participating organ procurement organization was responsible for implementation of the interventions. The RAPiD hospital evaluations revealed gaps in respondents' knowledge of organ donation, brain death, and referral criteria; a reluctance to declare brain death; and a rocky relationship between the hospitals and the organ procurement organization. As a result of the interventions, 9 hospitals' environments for organ donation improved, 7 showed no change, and 1 was worse.

  6. Impact of highway construction on water bodies: a geospatial assessment.

    PubMed

    Vijay, Ritesh; Kushwaha, Vikash K; Mardikar, Trupti; Labhasetwar, P K

    2017-08-01

    India has witnessed a massive infrastructure boom in the past few years. One of such projects is National Highway-7 (NH-7), a North-South highway connecting Kanyakumari, Tamil Nadu, to Varanasi, Uttar Pradesh, traversing many water bodies. The present study aims to assess the pre- and post-construction impact due to existing, new and widened NH-7 on the physical status of the water bodies, using remote sensing techniques. Satellite images spanning 22 years were procured and analysed for change detection in land use and land cover within the waterbodies. The study indicates that construction activities have led to transformation within the water bodies regarding reduction in area and inter-changing of land use and land cover classes, in turn leading to siltation and reduction of recharge.

  7. Long life monopropellant hydrazine thruster evaluation for Space Station Freedom application - Test results

    NASA Technical Reports Server (NTRS)

    Popp, Christopher G.; Cook, Joseph C.; Ragland, Brenda L.; Pate, Leah R.

    1992-01-01

    In support of propulsion system thruster development activity for Space Station Freedom (SSF), NASA Johnson Space Center (JSC) conducted a hydrazine thruster technology demonstration program. The goal of this program was to identify impulse life capability of state-of-the-art long life hydrazine thrusters nominally rated for 50 pounds thrust at 300 psia supply pressure. The SSF propulsion system requirement for impulse life of this thruster class is 1.5 million pounds-seconds, corresponding to a throughput of approximately 6400 pounds of propellant. Long life thrusters were procured from The Marquardt Company, Hamilton Standard, and Rocket Research Company, Testing at JSC was completed on the thruster designs to quantify life while simulating expected thruster firing duty cycles and durations for SSF. This paper presents a review of the SSF propulsion system hydrazine thruster requirements, summaries of the three long life thruster designs procured by JSC and acceptance test results for each thruster, the JSC thruster life evaluation test program, and the results of the JSC test program.

  8. The impact of HTA and procurement practices on the selection and prices of medical devices.

    PubMed

    Callea, Giuditta; Armeni, Patrizio; Marsilio, Marta; Jommi, Claudio; Tarricone, Rosanna

    2017-02-01

    Technological innovation in healthcare yields better health outcomes but also drives healthcare expenditure, and governments are struggling to maintain an appropriate balance between patient access to modern care and the economic sustainability of healthcare systems. Health Technology Assessment (HTA) and centralized procurement are increasingly used to govern the introduction and diffusion of new technologies in an effort to make access to innovation financially sustainable. However, little empirical evidence is available to determine how they affect the selection of new technologies and unit prices. This paper focuses on medical devices (MDs) and investigates the combined effect of various HTA governance models and procurement practices on the two steps of the MD purchasing process (i.e., selecting the product and setting the unit price). Our analyses are based on primary data collected through a national survey of Italian public hospitals. The Italian National Health Service is an ideal case study because it is highly decentralized and because regions have adopted different HTA governance models (i.e., regional, hospital-based, double-level or no HTA), often in combination with centralized regional procurement programs. Hence, the Italian case allows us to test the impact of different combinations of HTA models and procurement programs in the various regions. The results show that regional HTA increases the probability of purchasing the costliest devices, whereas hospital-based HTA functions more like a cost-containment unit. Centralized regional procurement does not significantly affect MD selection and is associated with a reduction in the MD unit price: on average, hospitals located in regions with centralized procurement pay 10.1% less for the same product. Hospitals located in regions with active regional HTA programs pay higher prices for the same device (+23.2% for inexpensive products), whereas hospitals that have developed internal HTA programs pay 8.3% on average more for the same product. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    This report is concerned with the nature and scope of the technical services to be rendered and the general plan proposed for operation of Building 3525, High Radiation Level Examination Laboratory (HRLEL). The role of postirradiation examination in implementing the over- all task of irradiation testing for various programs under way at the Oak Ridge National Laboratory (ORNL) and the importance of this effort to the United Stat es reactor development program are stressed . The shielded-cell complex with provisions for remote decontamination, hot-equipment storage, and maintenance is described, as well as other supporting activities which are incorporated into themore » facility. The proposed technical functions include general observation, mensuration, nondestructive testing, burnup and induced-activity measurements, fission-gas sampling and analysis, corrosion evaluation and related measurements, disassembly and cutup, metallographic examination, mechanical-property determinations , and x -ray diffraction analyses. Equipment design and operational features to improve detection and measurement of selected properties in radioactive material s are described, also. The current status on design, procurement, construction, and preoperational testing of in- cell equipment in the mockup is presented along with a forecast of future needs. The mode of operation, manpower requirements, and management of the facility are discussed.« less

  10. 42 CFR 121.9 - Designated transplant program requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.9 Designated transplant program...) Has immediate access to microbiology, clinical chemistry, histocompatibility testing, radiology, and...

  11. 42 CFR 121.9 - Designated transplant program requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.9 Designated transplant program...) Has immediate access to microbiology, clinical chemistry, histocompatibility testing, radiology, and...

  12. 42 CFR 121.9 - Designated transplant program requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.9 Designated transplant program...) Has immediate access to microbiology, clinical chemistry, histocompatibility testing, radiology, and...

  13. 78 FR 46239 - Designations of Chief Acquisition Officer and Senior Procurement Executive

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Designations of Chief Acquisition Officer and Senior Procurement Executive and Delegation of Procurement... No. FR-5701-D-01] Designations of Chief Acquisition Officer and Senior Procurement Executive AGENCY... Procurement Officer as the Senior Procurement Executive. DATES: Effective Date: July 24, 2013. FOR FURTHER...

  14. 48 CFR 752.225-71 - Local procurement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...

  15. 48 CFR 752.225-71 - Local procurement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...

  16. Technical specification for vacuum systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Khaw, J.

    The vacuum systems at the Stanford Linear Accelerator Center (SLAC) are primarily of all-metal construction and operate at pressures from 10/sup -5/ to 10/sup -11/ Torr. The primary gas loads during operation result from thermal desorption and beam-induced desorption from the vacuum chamber walls. These desorption rates can be extremely high in the case of hydrocarbons and other contaminants. These specifications place a major emphasis on eliminating contamination sources. The specifications and procedures have been written to insure the cleanliness and vacuum integrity of all SLAC vacuum systems, and to assist personnel involved with SLAC vacuum systems in choosing andmore » designing components that are compatible with existing systems and meet the quality and reliability of SLAC vacuum standards. The specification includes requirements on design, procurement, fabrication, chemical cleaning, clean room practices, welding and brazing, helium leak testing, residual gas analyzer testing, bakeout, venting, and pumpdown. Also appended are specifications regarding acceptable vendors, isopropyl alcohol, bakeable valve cleaning procedure, mechanical engineering safety inspection, notes on synchrotron radiation, and specifications of numerous individual components. (LEW)« less

  17. Professional education and hospital development for organ donation.

    PubMed

    Fukushima, N; Konaka, S; Kato, O; Ashikari, J

    2012-05-01

    Because of the strict Organ Transplantation Act, only 81 brain dead (BD) organ donations had been performed in Japan for 13 years since 1997. The Act was revised on July 17, 2010, allowing, organs to be donated after BD with consent from the family, if the subject had not denied organ donation previously. This act has lead to an expectation of a 6-7-fold increase in BD donation. The 82 organ procurement coordinators (OPC) in Japan include 32 belonging to the Japanese Organ Network (JOT) and the others to each administrative division. JOT has guideline manuals of standard roles and procedures of OPC during organ procurement from BD and cardiac death donors. To manage the increased organ donations after the revision of the act, we have modified the education system. First, we modified the guideline manuals for OPC to correspond to the revised Transplant Act and governmental guidelines. Second, all OPC gathered in a meeting room to learn the new organ procurement system to deal with the revised Transplant Act and guidelines. Third, a special education program for 2 months was provided for the 10 newcomers. Last, the practical training in each donor case for newcomers was performed by older OPC. Topics of the education program were the revised transplant act and guidelines, family approach to organ donation, BD diagnosis, donor evaluation and management, organ procurement and preservation, allocation system, hospital development and family care. In the future, each OPC will be divided into special categories, such as the donor family OPC, the donor management OPC, and the operating room OPC. Therefore, we need to construct separate special education programs for each category. Copyright © 2012 Elsevier Inc. All rights reserved.

  18. Justification of Estimates for Fiscal Year 1984 Submitted to Congress January 1983: Missile Procurement.

    DTIC Science & Technology

    1983-01-01

    for procurement of the first operational SRAM/ Altair /MV. (RDTE PE 64406F, 1 245JF) Space Suttle - Tne Space Shuttle is a NASA development program to...ACQUISITION IA.. R STUART IINCIASSIFIED JAN 83 RO.J- AC-64- FIG 5/ 1 NL IIIIIIIIIIIIIu IIIIIIIIIIIIIl IIIIIIIIIIIIIhl IIIhhhhmh ii1w 1112., 0 1111Ŗ--5, I i...MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF STANARS - 963 -A ’!/ 1 JA 12 5955 DEPARTMENT OF THE AIR FORCE JUSTIFICATION OF E&IMATES FOR FISCAL YEAR

  19. Auctions vs negotiations: a study of price differentials.

    PubMed

    Kjerstad, Egil

    2005-12-01

    Recent contributions in auction and bargaining theory suggest that a procurer should place more faith in the power of competition among alternative suppliers than in his or her own negotiating skill. Based on data from 216 contracts between procurers and suppliers of medical and surgical articles, we test whether auctions and bargaining result in significantly different prices. The main results are that auctions give 'thicker' markets compared with negotiations, as expected, but that auctions do not result in significantly lower prices compared with negotiations. Copyright (c) 2005 John Wiley & Sons, Ltd.

  20. Flat panel display test and evaluation: procedures, standards, and facilities

    NASA Astrophysics Data System (ADS)

    Jackson, Timothy W.; Daniels, Reginald; Hopper, Darrel G.

    1997-07-01

    This paper addresses flat panel display test and evaluation via a discussion of procedures, standards and facilities. Procedures need to be carefully developed and documented to ensure that test accomplished in separate laboratories produce comparable results. The tests themselves must not be a source of inconsistency in test results when such comparisons are made in the course of procurements or new technology prototype evaluations. Standards are necessary to expedite the transition of the new display technologies into applications and to lower the costs of custom parts applied across disparate applications. The flat panel display industry is in the course of ascertaining and formulating such standards as they are of value to designers, manufacturers, marketers and users of civil and military products and equipment. Additionally, in order to inform the DoD and industry, the test and evaluation facilities of the Air Force Research Laboratory Displays Branch are described. These facilities are available to support procurements involving flat panel displays and to examine new technology prototypes. Finally, other government display testing facilities within the Navy and the Army are described.

  1. The Challenge of Access: Using Road Construction as a Tool in Counterinsurgency

    DTIC Science & Technology

    2011-06-10

    northward, as shown in figure 9. Built by the United States in the 1950s, the dam and its downstream channels provide water for irrigation across the...12. DISTRIBUTION / AVAILABILITY STATEMENT Approved for Public Release; Distribution is Unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT This...consolidated Russian control. It also brought Russia closer to an overriding strategic objective, the procurement of a warm water port from which to project

  2. Naval Procurement Problems: Theory and Practice

    DTIC Science & Technology

    1982-01-01

    contrast when construction is contracted for the product may be modified before delivery and new information of relevance to both parties may be learned en...defense policy which may be desirable. For example, what price are we willing to pay for flexibility and surge capacity is a defense policy question...work force by an order of magnitude and achieve the productivity used as a basis for contract pricing was a primary factor in the schedule slippage

  3. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2009-04-07

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs...statements among others, although not necessarily in the order shown below: • “I am deeply concerned about Northrop Grumman Ship Systems’ ( NGSS

  4. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-07-01

    Background, Issues, and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK...performed out of sequence and significant rework has been required, disrupting the optimal construction sequence and application of lessons learned...deeply concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to

  5. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-03-29

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...performed out of sequence and significant rework has been required, disrupting the optimal construction sequence and application of lessons learned...deeply concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to

  6. Technical change in US industry: A cross-industry analysis

    NASA Technical Reports Server (NTRS)

    Nelson, R. R. (Editor)

    1981-01-01

    The nature of the public policies which have influenced the pace and pattern of technical progress in a number of American industries is studied with the view of assessing the broad effects of these policies. The industries studied are agriculture, pharmaceuticals, semiconductors, computers, civil aircraft, automobiles and residential construction. The policies considered include research and development funding as well as government procurement, education, information dissemination, patent protection, licensing, regulations, and anti-trust policies.

  7. NATO Phase Zero Contracting - A Proposed Strategic and Operational Planning Construct Within the NATO Framework for Defense Planning and Standardization

    DTIC Science & Technology

    2015-02-12

    become better stewards of scarce resources, to eliminate potential waste, and to reduce abuse of taxpayer money due to poor management, operational...stewards of scarce resources, to eliminate potential waste, and to reduce abuse of taxpayer money due to poor management, operational redundancy and...Conference—Best Practices and Lessons Learned and Training and Educating for Acquisition, Procurement and Contracting in Defense Institutions

  8. The highly successful safe remediation of the Fernald waste pits undertaken under the privatization model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cherry, Mark; Lojek, Dave; Murphy, Con

    2003-02-23

    Remediation of eight waste pits at the Department of Energy (DOE) Fernald site, located northwest of Cincinnati, Ohio, involves excavating approximately one million tonnes in-situ of low-level waste which were placed in pits during Fernald's production era. This unique project, one of the largest in the history of CERCLA/Superfund, includes uranium and thorium contaminated waste, soils and sludges. These wet soils and sludges are thermally dried in a processing facility to meet Department of Transportation (DOT) transportation and disposal facility waste acceptance criteria, loaded into railcars and shipped to the Envirocare waste disposal facility at Clive, Utah. This project ismore » now approximately 60% complete with more than 415,000 tonnes (460,000 tons) of waste material safely shipped in 74 unit trains to Envirocare. Work is scheduled to be completed in early 2005. Success to date demonstrates that a major DOE site remediation project can be safely and successfully executed in partnership with private industry, utilizing proven commercial best practices, existing site labor resources and support of local stakeholders. In 1997 under the DOE's privatization initiative, Fluor Fernald, Inc. (Fluor Fernald) solicited the services of the remediation industry to design, engineer, procure, construct, own and operate a facility that would undertake the remediation of the waste pits. The resulting procurement was awarded to IT Corporation, currently Shaw Environmental and Infrastructure, Inc. (Shaw). The contractor was required to finance the procurement and construction of its facilities and infrastructure. The contract was performance-based and payment would be made on the successful loadout of the waste from the facility on a per-ton basis meeting the Envirocare waste acceptance criteria. This paper details the performance to date, the challenges encountered, and the seamless partnering between DOE, the Environmental Protection Agency (EPA), Fluor Fernald, Shaw, labor un ions, and the local community in creating and executing a successful project.« less

  9. SMEX-Lite Modular Solar Array Architecture

    NASA Technical Reports Server (NTRS)

    Lyons, John W.; Day, John (Technical Monitor)

    2002-01-01

    The NASA Small Explorer (SMEX) missions have typically had three years between mission definition and launch. This short schedule has posed significant challenges with respect to solar array design and procurement. Typically, the solar panel geometry is frozen prior to going out with a procurement. However, with the SMEX schedule, it has been virtually impossible to freeze the geometry in time to avoid scheduling problems with integrating the solar panels to the spacecraft. A modular solar array architecture was developed to alleviate this problem. This approach involves procuring sufficient modules for multiple missions and assembling the modules onto a solar array framework that is unique to each mission. The modular approach removes the solar array from the critical path of the SMEX integration and testing schedule. It also reduces the cost per unit area of the solar arrays and facilitates the inclusion of experiments involving new solar cell or panel technologies in the SMEX missions.

  10. Computerized engineering logic for nuclear procurement and dedication processes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tulay, M.P.

    1996-12-31

    In an attempt to better meet the needs of operations and maintenance organizations, many nuclear utility procurement engineering groups have simplified their procedures, developed on-line tools for performing the specification of replacement items, and developed relational databases containing part-level information necessary to automate the procurement process. Although these improvements have helped to reduce the engineering necessary to properly specify and accept/dedicate items for nuclear safety-related applications, a number of utilities have recognized that additional long-term savings can be realized by integrating a computerized logic to assist technical procurement engineering personnel. The most commonly used logic follows the generic processes containedmore » in Electric Power Research Institute (EPRI) published guidelines. The processes are typically customized to some extent to accommodate each utility`s organizational structure, operating procedures, and strategic goals. This paper will discuss a typical logic that integrates the technical evaluation, acceptance, and receipt inspection and testing processes. The logic this paper will describe has been successfully integrated at a growing number of nuclear utilities and has produced numerous positive results. The application of the logic ensures that utility-wide standards or procedures, common among multi-site utilities, are followed.« less

  11. FY94 CAG trip reports, CAG memos and other products: Volume 2. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-15

    The Yucca Mountain Site Characterization Project (YMP) of the US DOE is tasked with designing, constructing, and operating an Exploratory Studies Facility (ESF) at Yucca Mountain, Nevada. The purpose of the YMP is to provide detailed characterization of the Yucca Mountain site for the potential mined geologic repository for permanent disposal of high-level radioactive waste. Detailed characterization of properties of the site are to be conducted through a wide variety of short-term and long-term in-situ tests. Testing methods require the installation of a large number of test instruments and sensors with a variety of functions. These instruments produce analog andmore » digital data that must be collected, processed, stored, and evaluated in an attempt to predict performance of the repository. The Integrated Data and Control System (IDCS) is envisioned as a distributed data acquisition that electronically acquires and stores data from these test instruments. IDCS designers are responsible for designing and overseeing the procurement of the system, IDCS Operation and Maintenance operates and maintains the installed system, and the IDCS Data Manager is responsible for distribution of IDCS data to participants. This report is a compilation of trip reports, interoffice memos, and other memos relevant to Computer Applications Group, Inc., work on this project.« less

  12. Transformation of fraud activities in procurement system in Indonesia

    NASA Astrophysics Data System (ADS)

    Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.

    2017-03-01

    E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.

  13. Operating a petabyte class archive at ESO

    NASA Astrophysics Data System (ADS)

    Suchar, Dieter; Lockhart, John S.; Burrows, Andrew

    2008-07-01

    The challenges of setting up and operating a Petabyte Class Archive will be described in terms of computer systems within a complex Data Centre environment. The computer systems, including the ESO Primary and Secondary Archive and the associated computational environments such as relational databases will be explained. This encompasses the entire system project cycle, including the technical specifications, procurement process, equipment installation and all further operational phases. The ESO Data Centre construction and the complexity of managing the environment will be presented. Many factors had to be considered during the construction phase, such as power consumption, targeted cooling and the accumulated load on the building structure to enable the smooth running of a Petabyte class Archive.

  14. The Danish Organic Action Plan 2020: assessment method and baseline status of organic procurement in public kitchens.

    PubMed

    Sørensen, Nina N; Lassen, Anne D; Løje, Hanne; Tetens, Inge

    2015-09-01

    With political support from the Danish Organic Action Plan 2020, organic public procurement in Denmark is expected to increase. In order to evaluate changes in organic food procurement in Danish public kitchens, reliable methods are needed. The present study aimed to compare organic food procurement measurements by two methods and to collect and discuss baseline organic food procurement measurements from public kitchens participating in the Danish Organic Action Plan 2020. Comparison study measuring organic food procurement by applying two different methods, one based on the use of procurement invoices (the Organic Cuisine Label method) and the other on self-reported procurement (the Dogme method). Baseline organic food procurement status was based on organic food procurement measurements and background information from public kitchens. Public kitchens participating in the six organic food conversion projects funded by the Danish Organic Action Plan 2020 during 2012 and 2013. Twenty-six public kitchens (comparison study) and 345 public kitchens (baseline organic food procurement status). A high significant correlation coefficient was found between the two organic food procurement measurement methods (r=0·83, P<0·001) with measurements relevant for the baseline status. Mean baseline organic food procurement was found to be 24 % when including measurements from both methods. The results indicate that organic food procurement measurements by both methods were valid for the baseline status report of the Danish Organic Action Plan 2020. Baseline results in Danish public kitchens suggest there is room for more organic as well as sustainable public procurement in Denmark.

  15. LSST telescope and site status

    NASA Astrophysics Data System (ADS)

    Gressler, William J.

    2016-07-01

    The Large Synoptic Survey Telescope (LSST) Project1 received its construction authorization from the National Science Foundation in August 2014. The Telescope and Site (T and S) group has made considerable progress towards completion in subsystems required to support the scope of the LSST science mission. The LSST goal is to conduct a wide, fast, deep survey via a 3-mirror wide field of view optical design, a 3.2-Gpixel camera, and an automated data processing system. The summit facility is currently under construction on Cerro Pachón in Chile, with major vendor subsystem deliveries and integration planned over the next several years. This paper summarizes the status of the activities of the T and S group, tasked with design, analysis, and construction of the summit and base facilities and infrastructure necessary to control the survey, capture the light, and calibrate the data. All major telescope work package procurements have been awarded to vendors and are in varying stages of design and fabrication maturity and completion. The unique M1M3 primary/tertiary mirror polishing effort is completed and the mirror now resides in storage waiting future testing. Significant progress has been achieved on all the major telescope subsystems including the summit facility, telescope mount assembly, dome, hexapod and rotator systems, coating plant, base facility, and the calibration telescope. In parallel, in-house efforts including the software needed to control the observatory such as the scheduler and the active optics control, have also seen substantial advancement. The progress and status of these subsystems and future LSST plans during this construction phase are presented.

  16. Microprocessor Seminar, phase 2

    NASA Technical Reports Server (NTRS)

    Scott, W. R.

    1977-01-01

    Workshop sessions and papers were devoted to various aspects of microprocessor and large scale integrated circuit technology. Presentations were made on advanced LSI developments for high reliability military and NASA applications. Microprocessor testing techniques were discussed, and test data were presented. High reliability procurement specifications were also discussed.

  17. The trajectories of Prevention through Design in construction.

    PubMed

    Toole, T Michael; Gambatese, John

    2008-01-01

    Construction Hazards Prevention through Design (CHPtD) is a process in which engineers and architects explicitly consider the safety of construction workers during the design process. Although articles on CHPtD have appeared in top construction journals, the literature has not addressed technical principles underlying CHPtD to help designers better perform CHPtD, to facilitate the development of additional CHPtD tools, and to predict the future path of CHPtD. This theoretical paper uses the existing literature on CHPtD and current action research associated with several CHPtD workgroups to analyze how CHPtD will likely evolve over the coming decades. There are four trajectories along which CHPtD will progress. (a) Designs will increasingly facilitate prefabricated construction; (b) designers will increasingly choose materials and systems that are inherently safer than alternatives; (c) designers will increasingly perform construction engineering; and (d) designers will increasingly apply spatial considerations to reduce worker hazards. By understanding how CHPtD may be manifested in the engineering-procurement-construction (EPC) industry, practitioners can better prepare for adopting CHPtD within their organizations and construction and engineering educators can better prepare their graduates to perform CHPtD.

  18. A (13)C NMR analysis of the effects of electron radiation on graphite/polyetherimide composites

    NASA Technical Reports Server (NTRS)

    Ferguson, Milton W.

    1989-01-01

    Initial investigations have been made into the use of high resolution nuclear magnetic resonance (NMR) for the characterization of radiation effects in graphite and Kevlar fibers, polymers, and the fiber/matrix interface in graphite/polyetherimide composites. Sample preparation techniques were refined. Essential equipment has been procured. A new NMR probe was constructed to increase the proton signal-to-noise ratio. Problem areas have been identified and plans developed to resolve them.

  19. Navy DDG-1000 and DDG-51 Destroyer Programs: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2009-06-04

    Aegis combat system and the arming of the ship with the SM-3, a version of the Navy’s Standard Missile that is designed for BMD operations.6 Total...and assigning the construction of those ships to GD/BIW and/or NGSB; • procuring AGS- armed versions of the basic LPD-17 class hull—another option...subcommittee of the House Armed Services Committee.24 22 Christopher P. Cavas, “All

  20. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  1. Analysis of procurement processes and development of recommendations for intelligent transportation systems (ITS) procurements : final report.

    DOT National Transportation Integrated Search

    2007-09-01

    Traditional state procurement processes are not well-suited to the procurement of Intelligent Transportation Systems (ITS). The objective of this study was to analyze Kentuckys existing procurement processes, identify strengths and weaknesses of e...

  2. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  3. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  4. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  5. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  6. 23 CFR 172.5 - Methods of procurement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated... negotiation. Contracting agencies shall use competitive negotiation for the procurement of engineering and...

  7. 22 CFR 201.23 - Procurement under private sector procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement under private sector procedures... § 201.23 Procurement under private sector procedures. (a) General requirements. Procurements under private sector procedures will normally be carried out by importers using negotiated procurement...

  8. 76 FR 53419 - Procurement List; Proposed Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    ...., Farmville, VA. Service Type/Location: Grounds Maintenance, Air Force Research Laboratory Stockbridge Test... Activity: Dept. of the Air Force, FA8751 AFRL RIKO, Rome, NY. Patricia Briscoe, Deputy Director, Business...

  9. Life sciences flight experiments program, life sciences project division, procurement quality provisions

    NASA Technical Reports Server (NTRS)

    House, G.

    1980-01-01

    Methods are defined for implementing quality assurance policy and requirements for life sciences laboratory equipment, experimental hardware, integration and test support equipment, and integrated payloads.

  10. 75 FR 13262 - Procurement List Additions and Deletions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ...: Additions to and deletions from the Procurement List. SUMMARY: This action adds to the Procurement List a... severe disabilities, and deletes from the Procurement List services previously furnished by such agencies... Severely Disabled published notices of proposed additions to the Procurement List. After consideration of...

  11. 75 FR 49481 - Procurement List; Additions and Deletion

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... added to the Procurement List: Services Service Type/Locations: Laundry Service, Atlanta VA Medical...: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities and deletes a service from the Procurement List previously furnished by such agency. DATES...

  12. Encapsulation of a Decision-Making Model to Optimize Supplier Selection via Structural Equation Modeling (SEM)

    NASA Astrophysics Data System (ADS)

    Sahul Hameed, Ruzanna; Thiruchelvam, Sivadass; Nasharuddin Mustapha, Kamal; Che Muda, Zakaria; Mat Husin, Norhayati; Ezanee Rusli, Mohd; Yong, Lee Choon; Ghazali, Azrul; Itam, Zarina; Hakimie, Hazlinda; Beddu, Salmia; Liyana Mohd Kamal, Nur

    2016-03-01

    This paper proposes a conceptual framework to compare criteria/factor that influence the supplier selection. A mixed methods approach comprising qualitative and quantitative survey will be used. The study intend to identify and define the metrics that key stakeholders at Public Works Department (PWD) believed should be used for supplier. The outcomes would foresee the possible initiatives to bring procurement in PWD to a strategic level. The results will provide a deeper understanding of drivers for supplier’s selection in the construction industry. The obtained output will benefit many parties involved in the supplier selection decision-making. The findings provides useful information and greater understanding of the perceptions that PWD executives hold regarding supplier selection and the extent to which these perceptions are consistent with findings from prior studies. The findings from this paper can be utilized as input for policy makers to outline any changes in the current procurement code of practice in order to enhance the degree of transparency and integrity in decision-making.

  13. Standard spacecraft economic analysis. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Harris, E. D.; Large, J. P.

    1976-01-01

    A study of the comparative program costs associated with use of various standardized spacecraft for Air Force space test program missions to be flown on the space shuttle during the 1980-1990 time period is reviewed. The first phase of the study considered a variety of procurement mixes composed of existing or programmed NASA standard spacecraft designs and a Air Force standard spacecraft design. The results were briefed to a joint NASA/Air Force audience on July 11, 1976. The second phase considered additional procurement options using an upgraded version of an existing NASA design. The results of both phases are summarized.

  14. Public perspectives on biospecimen procurement: what biorepositories should consider.

    PubMed

    L'Heureux, Jamie; Murray, Jeffrey C; Newbury, Elizabeth; Shinkunas, Laura; Simon, Christian M

    2013-06-01

    Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus "direct" procurement strategies such as the drawing of blood. Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens.

  15. SMEX-Lite Modular Solar Array Architecture

    NASA Technical Reports Server (NTRS)

    Lyons, John

    2002-01-01

    For the most part, Goddard solar arrays have been custom designs that are unique to each mission. The solar panel design has been frozen prior to issuing an RFP for their procurement. There has typically been 6-9 months between RFP release and contract award, followed by an additional 24 months for performance of the contract. For Small Explorer (SMEX) missions, with three years between mission definition and launch, this has been a significant problem. The SMEX solar panels have been sufficiently small that the contract performance period has been reduced to 12-15 months. The bulk of this time is used up in the final design definition and fabrication of flight solar cell assemblies. Even so, it has been virtually impossible to have the spacecraft design at a level of maturity sufficient to freeze the solar panel geometry and release the RFP in time to avoid schedule problems with integrating the solar panels to the spacecraft. With that in mind, the SMEX-Lite project team developed a modular architecture for the assembly of solar arrays to greatly reduce the cost and schedule associated with the development of a mission- specific solar array. In the modular architecture, solar cells are fabricated onto small substrate panels. This modular panel (approximately 8.5" x 17" in this case) becomes the building block for constructing solar arrays for multiple missions with varying power requirements and geometrical arrangements. The mechanical framework that holds these modules together as a solar array is the only mission-unique design, changing in size and shape as required for each mission. There are several advantages to this approach. First, the typical solar array development cycle requires a mission unique design, procurement, and qualification including a custom qualification panel. With the modular architecture, a single qualification of the SMEX-Lite modules and the associated mechanical framework in a typical configuration provided a qualification by similarity to multiple missions. It then becomes possible to procure solar array modules in advance of mission definition and respond quickly and inexpensively to a selected mission's unique requirements. The solar array modular architecture allows the procurement of solar array modules before the array geometry has been frozen. This reduces the effect of procurement lead-time on the mission integration and test flow by as much as 50%. Second, by spreading the non-recurring costs over multiple missions, the cost per unit area is also reduced. In the case of the SMEX-Lite procurement, this reduction was by about one third of the cost per unit area compared to previous SMEX mission-unique procurements. Third, the modular architecture greatly facilitates the infusion of new solar cell technologies into flight programs as these technologies become available. New solar cell technologies need only be fabricated onto a standard-sized module to be incorporated into the next available mission. The modular solar array can be flown in a mixed configuration with some new and some standard cell technologies. Since each module has its own wiring terminals, the array can be arranged as desired electrically with little impact to cost and schedule. The solar array modular architecture does impose some additional constraints on systems and subsystem engineers. First, they must work with discrete solar array modules rather than size the array to fit exactly within an available envelope. The array area is constrained to an integer multiple of the module area. Second, the modular design is optimized for space radiation and thermal environments not greatly different from a typical SMEX LEO environment. For example, a mission with a highly elliptical orbit (e.g., Polar, SMEX/FAST) would require thicker coverglasses to protect the solar cells from the more intense radiation environment.

  16. 77 FR 11071 - Procurement List; Additions and Deletions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ...: Additions to and Deletions from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies... People Who Are Blind or Severely Disabled published notices of proposed additions to the Procurement List...

  17. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  18. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  19. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  20. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  1. Investigate zero-stress replicated optics

    NASA Technical Reports Server (NTRS)

    Engelhaupt, Darell; Rood, Robert

    1993-01-01

    The contracted activities for the procurement of 'Investigate Zero-Stress Replicated Optics' to support the AXAF-S x-ray spectrometer mirrors has been completed. To date four large Wolter I grazing incidence x-ray optical shells have been electroformed from nickel. The mirrors were fabricated utilizing each of two nickel alloy plated aluminum substrates twice. A wide variety of testing has been completed by NASA MSFC and UAH. This testing includes heat treatment control tests, subscale plating and fixture testing, alloy control of the electroless nickel, adhesion and release testing of the gold to electroless nickel, electroforming instrumentation and software and fabrication of subscale models. The full scale shells are one millimeter thick nickel electrodeposited over a thin gold layer which in turn has the optical surface on the inside. The optical surface is the replicate of the surface prepared on the substrate. Appendix I briefly outlines the fabrication process. Major objectives which were shared by UAH and MSFC include the design of facilities, equipment and tooling and procurement of materials and equipment. Process development followed with the fabrication of small scale pilot units. Procurement commenced immediately and equipment and materials were ordered to implement the fabrication of first surface full scale substrates (mandrels) and the second surface electroformed optical components. All principal objectives have been achieved. Inspection of the mirrors in visible and x-ray modes validates that the required performance and the quality can be achieved by an electroforming replication process. A very distinct progressive improvement has been achieved with each of the four mirrors produced. The final mirror exceeded the original goals and set an improved standard for flight hardware. The future goal of a 30 arc second resolution at 8 KEV x-ray appears to be achievable by this process when proper cleanliness and process control is utilized.

  2. 75 FR 4784 - Procurement List; Addition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... Procurement List. SUMMARY: This action adds to the Procurement List a service to be furnished by a nonprofit... Who Are Blind or Severely Disabled published a notice of proposed addition to the Procurement List... Committee has determined that the service listed below is suitable for procurement by the Federal Government...

  3. 14 CFR § 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NASA procurement program. § 1201.400... ORGANIZATION AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  4. 22 CFR 1006.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Are any procurement contracts included as... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1006.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  5. 21 CFR 1404.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  6. 21 CFR 1404.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  7. 34 CFR 85.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 85.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  8. Regional and temporal trends in malaria commodity costs: an analysis of Global Fund data for 79 countries.

    PubMed

    Wafula, Francis; Agweyu, Ambrose; Macintyre, Kate

    2013-12-30

    Although procurement consumes nearly 40% of Global Fund's money, no analyses have been published to show how costs vary across regions and time. This paper presents an analysis of malaria-related commodity procurement data from 79 countries, as reported through the Global Fund's price and quality reporting (PQR) system for the 2005-2012 period. Data were analysed for the three most widely procured commodities for prevention, diagnosis and treatment of malaria. These were long-lasting insecticide-treated nets (LLINs), malaria rapid diagnostic tests (RDTs) and the artemether/lumefantrine (AL) combination treatment. Costs were compared across time (2005-2012), regions, and between individual procurement reported through the PQR and pooled procurement reported through the Global Fund's voluntary pooled procurement (VPP) system. All costs were adjusted for inflation and reported in US dollars. The data included 1,514 entries reported from 79 countries over seven years. Of these, 492 entries were for LLINs, 330 for RDTs and 692 for AL. Considerable variations were seen by commodity, although none showed an increase in cost. The costs for LLINs, RDTs and AL all dropped significantly over the period of analysis. Regional variations were also seen, with the cost for all three commodities showing significant variations. The median cost for a single LLIN ranged from USD 4.3 in East Asia to USD 5.0 in West and Central Africa. The cost of a single RDT was lowest in West and Central Africa at US$ 0.57, and highest in the Latin American region at US$ 1.1. AL had the narrowest margin of between US$ 0.06 per tablet in sub-Saharan Africa and South Asia, and US$ 0.08 in the Latin American and Eastern Europe regions. This paper concludes that global procurement costs do vary by region and have reduced overall over time. This suggests a mature market is operating when viewed from the global level, but regional variation needs further attention. Such analyses should be done more often to identify and correct market insufficiencies.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.

    The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release frommore » Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design or Safety Analyses.”« less

  10. 78 FR 34867 - Designation of Product Categories for Federal Procurement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... products for which USDA has biobased content test data. Because the submission of product samples for... certification to use the USDA Certified Biobased Product label. These test results are also considered when.... Outreach. To augment its own research, USDA consults with industry and Federal stakeholders to the...

  11. 41 CFR 101-25.101-2 - Supply through storage and issue.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 25-GENERAL 25.1... close inspection or testing is necessary to secure quality, or where repetitive inspection and test of... distribution system does not exist to assure availability at use point. (6) Where volume purchases are...

  12. 41 CFR 101-25.101-2 - Supply through storage and issue.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 25-GENERAL 25.1... close inspection or testing is necessary to secure quality, or where repetitive inspection and test of... distribution system does not exist to assure availability at use point. (6) Where volume purchases are...

  13. 78 FR 19393 - Designation of Product Categories for Federal Procurement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... products for which USDA has biobased content test data. Because the submission of product samples for... certification to use the USDA Certified Biobased Product label. These test results are also considered when.... Outreach. To augment its own research, USDA consults with industry and Federal stakeholders to the...

  14. Public Perspectives on Biospecimen Procurement: What Biorepositories Should Consider

    PubMed Central

    L'Heureux, Jamie; Murray, Jeffrey C.; Newbury, Elizabeth; Shinkunas, Laura

    2013-01-01

    Purpose Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus “direct” procurement strategies such as the drawing of blood. Methods Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. Results The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Conclusion Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens. PMID:24850089

  15. 14 CFR 29.621 - Casting factors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...

  16. 14 CFR 27.621 - Casting factors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...

  17. 14 CFR 29.621 - Casting factors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...

  18. 14 CFR 27.621 - Casting factors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...

  19. Advocating mindset for cooperative partnership for better future of construction industry

    NASA Astrophysics Data System (ADS)

    Omar, Datuk Wahid

    2017-11-01

    Construction industry players are known for their low acceptance on the changes. Hence, it is identified that the biggest challenge in the industry is changing the mindset. This paper highlights the importance of transformation in shaping for better future of the industry. Transformation favors innovation and progressive development in the industry and specifically in managing a project. Thus changes in mindset of players with an eye to the future and focus on what is coming are paramount in inculcating the transformation culture in construction eco-system. The key to the success of transformation is the collaborative and cooperative partnering which ensuring the performance of every stage of project delivery. The collaborative, cooperative and concerted effort of all parties involved in the project creates mutual understanding on mission and vision of project. Adopting healthy and harmonious project culture, implementing innovative procurement that emphasis on fair risk sharing should be a working culture. This cooperative partnership should be the future of the project undertaking in the construction industry.

  20. 13 CFR 121.407 - What are the size procedures for multiple item procurements?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Requirements for Government Procurement § 121.407 What are the size procedures for multiple item procurements? If a procurement calls for two or more specific end items or types of services with different size... multiple item procurements? 121.407 Section 121.407 Business Credit and Assistance SMALL BUSINESS...

  1. Design progress of cryogenic hydrogen system for China Spallation Neutron Source

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, G. P.; Zhang, Y.; Xiao, J.

    2014-01-29

    China Spallation Neutron Source (CSNS) is a large proton accelerator research facility with 100 kW beam power. Construction started in October 2011 and is expected to last 6.5 years. The cryogenic hydrogen circulation is cooled by a helium refrigerator with cooling capacity of 2200 W at 20 K and provides supercritical hydrogen to neutron moderating system. Important progresses of CSNS cryogenic system were concluded as follows. Firstly, process design of cryogenic system has been completed including helium refrigerator, hydrogen loop, gas distribution, and safety interlock. Secondly, an accumulator prototype was designed to mitigate pressure fluctuation caused by dynamic heat loadmore » from neutron moderation. Performance test of the accumulator has been carried out at room and liquid nitrogen temperature. Results show the accumulator with welding bellows regulates hydrogen pressure well. Parameters of key equipment have been identified. The contract for the helium refrigerator has been signed. Mechanical design of the hydrogen cold box has been completed, and the hydrogen pump, ortho-para hydrogen convertor, helium-hydrogen heat exchanger, hydrogen heater, and cryogenic valves are in procurement. Finally, Hydrogen safety interlock has been finished as well, including the logic of gas distribution, vacuum, hydrogen leakage and ventilation. Generally, design and construction of CSNS cryogenic system is conducted as expected.« less

  2. Archaeological investigations at a toolstone source area and temporary camp: Sample Unit 19-25, Nevada Test Site, Nye County, Nevada. Technical report No. 77

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, R.C.; DuBarton, A.; Edwards, S.

    1993-12-31

    Archaeological investigations were initiated at Sample Unit 19--25 to retrieve information concerning settlement and subsistence data on the aboriginal hunter and gatherers in the area. Studies included collection and mapping of 35.4 acres at site 26NY1408 and excavation and mapping of 0.02 acres at site 26NY7847. Cultural resources include two rock and brush structures and associated caches and a large lithic toolstone source area and lithic artifact scatter. Temporally diagnostic artifacts indicate periodic use throughout the last 12,000 years; however dates associated with projectile points indicate most use was in the Middle and Late Archaic. Radiocarbon dates from the rockmore » and brush structures at site 26NY7847 indicate a construction date of A.D. 1640 and repair between A.D. 1800 and 1950 for feature 1 and between A.D. 1330 and 1390 and repair at A.D. 1410 for feature 2. The dates associated with feature 2 place its construction significantly earlier than similar structures found elsewhere on Pahute Mesa. Activity areas appear to reflect temporary use of the area for procurement of available lithic and faunal resources and the manufacture of tools.« less

  3. Roles of sex and ethnicity in procurement coordinator--family communication during the organ donation discussion.

    PubMed

    Baughn, Daniel; Auerbach, Stephen M; Siminoff, Laura A

    2010-09-01

    Interpersonal relations with health care providers influence families' decisions to consent to solid-organ donation. However, previous research has been based on retrospective interviews with donation-eligible families and has not directly examined the interpersonal interactions between families and organ procurement coordinators. To increase understanding of the interpersonal interaction between procurement coordinators and families during the organ donation discussion, with special attention to the influence of the sex and race of the procurement coordinator and the race of the potential donor's family. A descriptive study in which standardized patients portrayed family members interacting with actual procurement coordinators in simulated donation request scenarios. Thirty-three videotaped interactions between standardized patients and 17 procurement coordinators involving 2 different scenarios depicting deceased donation were evaluated. Video recordings were rated by independent coders. Coders completed the Impact Message Inventory-Form C, the Participatory Style of Physician Scale, and the Siminoff Communication and Content and Affect Program-Global Observer Ratings scale. African American procurement coordinators, particularly African American women, were rated as more controlling and work-oriented than white procurement coordinators. Male procurement coordinators were more affiliative with the white family than the African American family, whereas female procurement coordinators were slightly less affiliative with the white family. African American procurement coordinators expressed more positive affect when interacting with the African American family than the white family, whereas the opposite was true for white procurement coordinators. Research is needed to cross-validate these exploratory findings and further examine cultural mistrust between procurement coordinators and families of ethnic minorities, especially given the negative attitudes of many minorities toward donation.

  4. Interim Results of a National Test of the Rapid Assessment of Hospital Procurement Barriers in Donation (RAPiD)

    PubMed Central

    Traino, H. M.; Alolod, G. P.; Shafer, T.; Siminoff, L. A.

    2012-01-01

    Organ donation remains a major public health challenge with over 114 000 people on the waitlist in the United States. Among other factors, extant research highlights the need to improve the identification and timely referral of potential donors by hospital health-care providers (HCPs) to organ procurement organizations (OPOs). We implemented a national test of the Rapid Assessment of hospital Procurement barriers in Donation (RAPiD) to identify assets and barriers to the organ donation and patient referral processes; assess hospital–OPO relationships and offer tailored recommendations for improving these processes. Having partnered with seven OPOs, data were collected at 70 hospitals with high donor potential in the form of direct observations and interviews with 2358 HCPs. We found that donation attitudes and knowledge among HCPs were high, but use of standard referral criteria was lacking. Significant differences were found in the donation-related attitudes, knowledge and behaviors of physicians and emergency department staff as compared to other staff in intensive care units with high organ donor potential. Also, while OPO staff were generally viewed positively, they were often perceived as outsiders rather than members of healthcare teams. Recommendations for improving the referral and donation processes are discussed. PMID:22900761

  5. Acquisition-Management Program

    NASA Technical Reports Server (NTRS)

    Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.

    1987-01-01

    NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.

  6. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2008-11-21

    PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...optimal construction sequence and application of lessons learned for follow-on vessels in these programs. In the LPD 17 program, the Navy’s reliance on an...I am deeply concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to

  7. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2009-07-20

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...overall. “While we agree on requirements—and the Navy and Marine Corps are pretty aligned on that—we have to balance the capability and the capacity...sequence and significant rework has been required, disrupting the optimal construction sequence and application of lessons learned for follow-on

  8. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-10-15

    Issues, And Options For Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...19 has been required, disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs. In...although not necessarily in the order shown below: • “I am deeply concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the

  9. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2009-12-22

    Issues, and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...balance of the force overall. “While we agree on requirements—and the Navy and Marine Corps are pretty aligned on that—we have to balance the...and significant rework has been required, disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in

  10. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2011-04-20

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...construction sequence and application of lessons learned for follow-on vessels in these programs. In the LPD 17 program, the Navy’s reliance on an immature...deeply concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to

  11. WEAVE an overview and status update

    NASA Astrophysics Data System (ADS)

    Bonifacio, P.; Dalton, G.; Trager, S.; Aguerri, A. L.; Carrasco, E.; Vallenari, A.; Abrams, D. C.; Middleton, K.; Sayède, F.

    2016-12-01

    The WHT Enhanced Area Velocity Explorer is a high multiplex, multi-object spectrograph that will equip the prime focus of the WHT 4.2m telescope. The instrument is currently in the construction phase and several components have already been procured. I will give a short overview of the instrument and of the project and its status. The French participation is done through CNRS - Institut National des Sciences de l'Univers and the technical activity is carried out, at this stage, at GEPI, Observatoire de Paris.

  12. Nondestructive Testing of Additive Manufactured Metal Parts Used in Aerospace Applications

    NASA Technical Reports Server (NTRS)

    Waller, Jess M.

    2018-01-01

    NDE inspectors, QA/QE professionals, and program managers responsible for the out-sourcing, procurement, fabrication, finishing, inspection, and qualification and certification of additively manufactured (AM) parts should attend this course.

  13. A quantitative analysis study on the implementation of partnering in the design and build construction project

    NASA Astrophysics Data System (ADS)

    Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.

    2018-02-01

    Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.

  14. Air Force Logistics Command (AFLC) solar thermal plant

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The plant proved its capability to deliver the desired energy product in a USAF industrial environment. The collector proved capable of energy conversion at insolation levels up to 25% below design minimum. The plant and the project were negatively affected by severe winter weather, with total insolation during the test period 60 percent less than the expected value. Environmental effects reduced plant availability to 55 percent. Only five, minimally good operating days were experienced during the test period. The subsequent lack of performance data prohibits the drawing of general conclusions regarding system performance. System operability was rated generally high. The only inhibiting factor was the difficulty in procuring replacement parts for rapid repair under USAF stockage and procurement policies. No inherently serious system failures were recorded, although a thermostatic valve malfunction in the freeze protection system ultimately took 30 days to repair.

  15. A cross-sectional survey of the models in Bihar and Tamil Nadu, India for pooled procurement of medicines.

    PubMed

    Chokshi, Maulik; Farooqui, Habib Hasan; Selvaraj, Sakthivel; Kumar, Preeti

    2015-01-01

    In India, access to medicine in the public sector is significantly affected by the efficiency of the drug procurement system and allied processes and policies. This study was conducted in two socioeconomically different states: Bihar and Tamil Nadu. Both have a pooled procurement system for drugs but follow different models. In Bihar, the volumes of medicines required are pooled at the state level and rate contracted (an open tender process invites bidders to quote for the lowest rate for the list of medicines), while actual invoicing and payment are done at district level. In Tamil Nadu, medicine quantities are also pooled at state level but payments are also processed at state level upon receipt of laboratory quality-assurance reports on the medicines. In this cross-sectional survey, a range of financial and non-financial data related to procurement and distribution of medicine, such as budget documents, annual reports, tender documents, details of orders issued, passbook details and policy and guidelines for procurement were analysed. In addition, a so-called ABC analysis of the procurement data was done to to identify high-value medicines. It was observed that Tamil Nadu had suppliers for 100% of the drugs on their procurement list at the end of the procurement processes in 2006, 2007 and 2008, whereas Bihar's procurement agency was only able to get suppliers for 56%, 59% and 38% of drugs during the same period. Further, it was observed that Bihar's system was fuelling irrational procurement; for example, fluconazole (antifungal) alone was consuming 23.4% of the state's drug budget and was being procured by around 34% of the districts during 2008-2009. Also, the ratios of procurement prices for Bihar compared with Tamil Nadu were in the range of 1.01 to 22.50. For 50% of the analysed drugs, the price ratio was more than 2, that is, Bihar's procurement system was procuring the same medicines at more than twice the prices paid by Tamil Nadu. Centralized, automated pooled procurement models like that of Tamil Nadu are key to achieving the best procurement prices and highest possible access to medicines.

  16. 41 CFR 101-26.505-3 - Requests to procure similar items from sources other than GSA supply sources.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requests to procure... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26...

  17. Statistical analysis of the Nb3Sn strand production for the ITER toroidal field coils

    NASA Astrophysics Data System (ADS)

    Vostner, A.; Jewell, M.; Pong, I.; Sullivan, N.; Devred, A.; Bessette, D.; Bevillard, G.; Mitchell, N.; Romano, G.; Zhou, C.

    2017-04-01

    The ITER toroidal field (TF) strand procurement initiated the largest Nb3Sn superconducting strand production hitherto. The industrial-scale production started in Japan in 2008 and finished in summer 2015. Six ITER partners (so-called Domestic Agencies, or DAs) are in charge of the procurement and involved eight different strand suppliers all over the world, of which four are using the bronze route (BR) process and four the internal-tin (IT) process. In total more than 500 tons have been produced including excess material covering losses during the conductor manufacturing process, in particular the cabling. The procurement is based on a functional specification where the main strand requirements like critical current, hysteresis losses, Cu ratio and residual resistance ratio are specified but not the strand production process or layout. This paper presents the analysis on the data acquired during the quality control (QC) process that was carried out to ensure the same conductor performance requirements are met by the different strand suppliers regardless of strand design. The strand QC is based on 100% billet testing and on applying statistical process control (SPC) limits. Throughout the production, samples adjacent to the strand pieces tested by the suppliers are cross-checked (‘verified’) by their respective DAs reference labs. The level of verification was lowered from 100% at the beginning of the procurement progressively to approximately 25% during the final phase of production. Based on the complete dataset of the TF strand production, an analysis of the SPC limits of the critical strand parameters is made and the related process capability indices are calculated. In view of the large-scale production and costs, key manufacturing parameters such as billet yield, number of breakages and piece-length distribution are also discussed. The results are compared among all the strand suppliers, focusing on the difference between BR and IT processes. Following the completion of the largest Nb3Sn strand production, our experience gained from monitoring the execution of the QC activities and from auditing the results from the measurements is summarised for future superconducting strand material procurement activities.

  18. Roland: A Case for or Against NATO Standardization?

    DTIC Science & Technology

    1980-05-01

    with often competing, even opposing, objectives in testing, financial auditing , cost estimating, reliability, value engineering, maintenance, training...supposedly mature system. Multilocation tests, early in the program when test beds and spare parts availability would be at a minimum, would require...Similar institutionalized conflicts resided in the audit community, which, under the Armed Services Procurement Regulation, was required to audit and

  19. Donor and procurement related issues in vascularized composite allograft transplantation.

    PubMed

    McDiarmid, Sue V

    2013-12-01

    To understand the unique requirements of vascularized composite allograft (VCA) donation and procurement practices and the integral role of the established nationwide organ procurement organizations in organ procurement. The recent issuance of a Final Rule (July 2013) by the United States Secretary of Health that redefines VCAs as organs rather than tissues, opens up the potential to formalize policies and procedures, under the auspices of the Organ Procurement and Transplantation Network, that can improve VCA donation, procurement practices, develop allocation algorithms and provide transparent oversight. Improved VCA donation rates, procurement procedures and broader sharing nationwide of VCA donors will have important implications in advancing the emerging field of VCA transplantation.

  20. Tissue procurement system in Japan: the role of a tissue bank in medical center for translational research, Osaka University Hospital.

    PubMed

    Ohkawara, H; Fukushima, N; Kitagawa, T; Ito, T; Masutani, Y; Sawa, Y

    2010-01-01

    Although organ procurement has been regulated by The Organ Transplantation Law (brain-dead donors since 1997, donors after cardiac death since 1979), there has been no law or governmental procurement network (except for cornea) in Japan. Since the late 1980s, some university hospitals have developed original banks. Finally, in 2001 guidelines for tissue procurement were established by The Japanese Society of Tissue Transplantation and Japan Tissue Transplant Network (JTTN) to coordinate tissue harvesting. Five tissue banks were joined to the tissue transplant network (skin in one, heart valves in two, and bone in two). As the number of tissue banks is small, each bank cooperates on procurement, but cannot cover the entire country. With regard to skin transplantation, only one skin bank-The Japan Skin Bank Network (JSBN), which is located in Tokyo-has organized skin procurement. Therefore, it has been difficult to procure skin in areas distant from Tokyo, especially around Osaka. In order to improve such a situation, a tissue bank collaborating with the JSBN was established at The Medical Center for Translational Research (MTR), Osaka University Hospital in April 2008. The bank has played a role in skin procurement center in western Japan and supported procurement and preservation at the time of the skin procurement. Between April 2008 and September 2009, the bank participated in eight tissue procurements in the western area. In the future, the bank is planning to procure and preserve pancreatic islets and bones. Moreover, there is a plan to set up an induced pluripotent stem cells center and stem cell bank in MTR. This tissue bank may play a role to increase tissue procurement in Japan, especially in the western area. .

  1. A Comparative Study of the Perceived Usefulness of Civilian Institution Contracting-Related Graduate Programs by Graduates and the Perceived Usefulness of the AFIT CAM (Air Force Institute of Technology Contracting and Manufacturing) Program by Graduates

    DTIC Science & Technology

    1985-09-01

    courses for a concentration in procurement and materials management: Procurement and Materials Management Procurement Contract Law Systems Procurement...for contracting in the public sector (Procurement Contract Law ). The respondents did not agree as much with this question as they did with the...the results of this section proved quite different from the group as a whole. Contract Law , Contract Negotiations, Pricing, Procurement Management

  2. A normal incidence, high resolution X-ray telescope for solar coronal observations

    NASA Technical Reports Server (NTRS)

    Golub, L.

    1984-01-01

    Efforts directed toward the completion of an X-ray telescope assembly design, the procurement of major components, and the coordination of optical fabrication and X-ray multilayer testing are reported.

  3. 32 CFR Appendix B to Part 286 - Addressing FOIA Requests

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (International & Commercial Programs) Deputy Under Secretary of Defense (Industrial Affairs & Installations... Research & Engineering Director, Small & Disadvantaged Business Utilization Director, Defense Procurement Director, Test Systems Engineering & Evaluation Director, Strategic & Tactical Systems DoD Radiation...

  4. Analysis of potential factors affecting microbiological cultures in tissue donors during procurement.

    PubMed

    Lannau, B; Van Geyt, C; Van Maele, G; Beele, H

    2015-03-01

    During the procurement of musculoskeletal grafts contamination may occur. As this might be detrimental for the acceptor, it is important to know which variables influence this occurrence and to alter procurement protocols accordingly. From 2004 to 2012 we gathered information on 6,428 allografts obtained from 291 donors. Using a multiple regression model we attempted to determine the factors that influence the contamination risk during procurement. We used the following variables: cause of death, type of hospital (i.e. university hospital vs. general hospital), previous blood vessel donation, previous organ donation, donor age, time between death and the start of the procurement, duration of the procurement, number of people attending the procurement and the number of procured grafts. The multiple regression model was only able to explain 5 % of the variability of the used outcome variable. None of the variables examined appear to have an important influence on the contamination risk.

  5. Tissue procurement and transplantation: a Tuscany perspective.

    PubMed

    Filipponi, F; De Simone, P; Saviozzi, A; Bozzi, G

    2008-01-01

    Tissue procurement and transplantation are rarely taken into account as indicators of the efficiency of a regional donor procurement network. We present herein a retrospective review on Tuscany tissue procurement activities from 2004 until 2006. In 2003 the Tuscan Regional Government appointed a transplantation service authority to reorganize all regional donation and transplantation activities: the Organizzazione Toscana Trapianti (OTT). The regional tissue procurement network was based on either brain death (BD) and cardiac death (CD) donors under the responsibility of in-hospital transplantation coordinators (IHTCs). From 2004 to 2006, a total of 397 tissue donors were procured in Tuscany, and 4151 tissue transplantations were performed: 2909 skin grafts, 1209 bone grafts, and 33 heart valves. Over the same period, a total of 2116 cornea donors were procured; 4117 corneas were retrieved; 1779 were fit for transplantation, and 1418 were transplanted. Based on our experience, implementation of tissue procurement requires use of BD donors and paramount organizational efforts from IHTCs.

  6. Surface electrical properties experiment study phase, volume 3

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The reliability and quality assurance system and procedures used in developing test equipment for the Lunar Experiment projects are described. The subjects discussed include the following: (1) documentation control, (2) design review, (3) parts and materials selection, (4) material procurement, (5) inspection procedures, (6) qualification and special testing, and failure modes and effects analysis.

  7. Operation HARDTACK. Phase 2

    DTIC Science & Technology

    1959-07-01

    Nevada Test Site. ditions, available equipment and material , and late criteria changes requesifd by the partici- "The Nevada tests will e held during...by visory personnel. H&N Field Engineers or the H&N Material TestsResident Engineer. The majority of material tests consisted of 3. Reports and...procurement of material and hol, date of request, date rquired, work to be equipment to be used in the test facilities pro- performed, and site or station

  8. Identifying behaviour patterns of construction safety using system archetypes.

    PubMed

    Guo, Brian H W; Yiu, Tak Wing; González, Vicente A

    2015-07-01

    Construction safety management involves complex issues (e.g., different trades, multi-organizational project structure, constantly changing work environment, and transient workforce). Systems thinking is widely considered as an effective approach to understanding and managing the complexity. This paper aims to better understand dynamic complexity of construction safety management by exploring archetypes of construction safety. To achieve this, this paper adopted the ground theory method (GTM) and 22 interviews were conducted with participants in various positions (government safety inspector, client, health and safety manager, safety consultant, safety auditor, and safety researcher). Eight archetypes were emerged from the collected data: (1) safety regulations, (2) incentive programs, (3) procurement and safety, (4) safety management in small businesses (5) production and safety, (6) workers' conflicting goals, (7) blame on workers, and (8) reactive and proactive learning. These archetypes capture the interactions between a wide range of factors within various hierarchical levels and subsystems. As a free-standing tool, they advance the understanding of dynamic complexity of construction safety management and provide systemic insights into dealing with the complexity. They also can facilitate system dynamics modelling of construction safety process. Copyright © 2015 Elsevier Ltd. All rights reserved.

  9. Procurement | NREL

    Science.gov Websites

    Procurement Procurement The National Renewable Energy Laboratory (NREL) offers numerous procurement source of biofuels. Register Your Small Business NREL welcomes small, disadvantaged, HUBzone, veteran -owned, and women-owned business vendors and subcontractors. Register today

  10. Quantifying the benefits of the Florida Transit Research Inspection Procurement Services (TRIPS) program : [research summary].

    DOT National Transportation Integrated Search

    2013-04-01

    Established in 1995 as the Florida Vehicle : Procurement Program (FVPP), Florida Transit : Research Inspection Procurement Services (TRIPS) : is a vehicle sourcing and procurement system for : Floridas public transit agencies that integrates : ins...

  11. Applying e-procurement system in the healthcare: the EPOS paradigm

    NASA Astrophysics Data System (ADS)

    Ketikidis, Panayiotis H.; Kontogeorgis, Apostolos; Stalidis, George; Kaggelides, Kostis

    2010-03-01

    One of the goals of procurement is to establish a competitive price, while e-procurement utilises electronic commerce to identify potential sources of supply, to purchase goods and services, to exchange contractual information and to interact with suppliers. Extensive academic work has been extensively devoted to e-procurement in diverse industries. However, applying e-procurement in the healthcare sector remains unexplored. It lacks an efficient e-procurement mechanism that will enable hospitals and healthcare suppliers to electronically exchange contractual information, aided by the technologies of optimisation and business rules. The development and deployment of e-procurement requires a major effort in the coordination of complex interorganisational business process. This article presents an e-procurement optimised system (EPOS) for the healthcare marketplace, a complete methodological approach for deploying and operating such system, as piloted in public and private hospitals in three European countries (Greece, Spain and Belgium) and suppliers of healthcare items in the fourth country (Italy). The efficient e-procurement mechanism that EPOS suggests enables hospitals and pharmaceutical and medical equipment suppliers to electronically exchange contractual information.

  12. A Planning Framework for the Deployment of Innovative Information and Communication Technologies in Procurement

    NASA Astrophysics Data System (ADS)

    Alard, Robert; Gustafsson, Martin; Nienhaus, Jörg

    The management of buyer-supplier relations is a major topic for many enterprises today. Modern Information and Communication Technologies (ICT) offer interesting perspectives on opportunities and implementation approaches. Today, logistics and procurement departments of numerous enterprises are evaluating the possibilities and opportunities of new ICT solutions and especially of internet-based electronic procurement solutions for the optimisation and re-engineering of their buyer-supplier relationships. Due to the highly innovative character of the new ICT solutions and the scarcely available operational examples in the industry, only little guidance exists to support responsible managers during the evaluation, planning and designing of internet-based electronic procurement solutions. This paper describes a framework for the strategic evaluation and planning of the deployment of internet-based procurement solutions for direct materials. The presented approach supports enterprises in the analysis of procurement objects and procurement structuring, in the definition and management of buyer-supplier-relationships, in the requirements analysis of ICT solutions as well as the assessment of the potential to support procurement with innovative ICT and internet-based electronic procurement solutions.

  13. Welding consumable selection for cryogenic (4{degrees}K) application

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kane, S.F.; Siewert, T.A.

    1994-12-31

    Brookhaven National Laboratory (BNL) has begun construction of a large (3.8 kilometer circumference) heavy ion collider for the Department of Energy. The collider uses superconducting magnets, operating at 4{degrees}K in supercritical helium, which meets the definition of a pressure vessel. The ASME Boiler & Pressure Vessel Code grants an exemption from impact testing to certain metals, but only for operating temperatures down to 20{degrees}K. Research and the latest change to ASTM Standard E23 have invalidated Charpy testing at 4{degrees}K, thus compliance with the Code is not possible. This effort was undertaken to identify the weld process and weld material necessarymore » to comply with the intent of the Code (impact test) requirements, that is, to design a weld joint that will assure adequate fracture toughness. We will report the results of this development and testing, and conclude that nitrogen and maganese enhanced 385L provides a superior weld metal for 4{degrees}K cryogenic applications without the exaggerated purity concerns normally associated with superaustenitic weld materials. This development has been so successful that BNL has procured 15,000 pounds of this material for magnet production. Oxygen content, manifested as inclusion density, has the single most significant effect upon fracture toughness and impact strength. Finally, we report that GMAW is a viable welding process, using off-the-shelf equipment, for 4{degrees}K cryogenic applications.« less

  14. Adoption of Rapid Diagnostic Tests for the Diagnosis of Malaria, a Preliminary Analysis of the Global Fund Program Data, 2005 to 2010

    PubMed Central

    Zhao, Jinkou; Lama, Marcel; Korenromp, Eline; Aylward, Patrick; Shargie, Estifanos; Filler, Scott; Komatsu, Ryuichi; Atun, Rifat

    2012-01-01

    Introduction The World Health Organization Guidelines for the Treatment of Malaria, in 2006 and 2010, recommend parasitological confirmation of malaria before commencing treatment. Although microscopy has been the mainstay of malaria diagnostics, the magnitude of diagnostic scale up required to follow the Guidelines suggests that rapid diagnostic tests (RDTs) will be a large component. This study analyzes the adoption of rapid diagnostic testing in malaria programs supported by the Global Fund to fight AIDS, Tuberculosis and Malaria (Global Fund), the leading international funder of malaria control globally. Methods and Findings We analyzed, for the period 2005 to 2010, Global Fund programmatic data for 81 countries on the quantity of RDTs planned; actual quantities of RDTs and artemisinin-based combination treatments (ACTs) procured in 2009 and 2010; RDT-related activities including RDTs distributed, RDTs used, total diagnostic tests including RDTs and microscopy performed, health facilities equipped with RDTs; personnel trained to perform rapid diagnostic malaria test; and grant budgets allocated to malaria diagnosis. In 2010, diagnosis accounted for 5.2% of malaria grant budget. From 2005 to 2010, the procurement plans include148 million RDTs through 96 malaria grants in 81 countries. Around 115 million parasitological tests, including RDTs, had reportedly been performed from 2005 to 2010. Over this period, 123,132 health facilities were equipped with RDTs and 137,140 health personnel had been trained to perform RDT examinations. In 2009 and 2010, 41 million RDTs and 136 million ACTs were purchased. The ratio of procured RDTs to ACTs was 0.26 in 2009 and 0.34 in 2010. Conclusions/significance Global Fund financing has enabled 81 malaria-endemic countries to adopt WHO guidelines by investing in RDTs for malaria diagnosis, thereby helping improve case management of acute febrile illness in children. However, roll-out of parasitological diagnosis lags behind the roll-out of ACT-based treatment, and will require prioritization of investments. PMID:22952703

  15. 24 CFR 963.12 - Alternative procurement process.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT PUBLIC HOUSING-CONTRACTING WITH RESIDENT-OWNED BUSINESSES Contracting With Resident-Owned Businesses § 963.12 Alternative procurement process. (a) Method of procurement. In contracting with resident-owned businesses, the PHA shall follow the applicable method of procurement as set forth...

  16. Endoscopic versus transcranial procurement of allograft tympano-ossicular systems: a prospective double-blind randomized controlled audit.

    PubMed

    Caremans, Jeroen; Hamans, Evert; Muylle, Ludo; Van de Heyning, Paul; Van Rompaey, Vincent

    2016-06-01

    Allograft tympano-ossicular systems (ATOS) have proven their use over many decades in tympanoplasty and reconstruction after resection of cholesteatoma. The transcranial bone plug technique has been used in the past 50 years to procure en bloc ATOS (tympanic membrane with malleus, incus and stapes attached). Recently, our group reported the feasibility of the endoscopic procurement technique. The aim of this study was to assess whether clinical outcome is equivalent in ATOS acquired by using the endoscopic procurement technique compared to ATOS acquired by using the transcranial technique. A double-blind randomized controlled audit was performed in a tertiary referral center in patients that underwent allograft tympanoplasty because of chronic otitis media with and without cholesteatoma. Allograft epithelialisation was evaluated at the short-term postoperative visit by microscopic examination. Failures were reported if reperforation was observed. Fifty patients underwent allograft tympanoplasty: 34 received endoscopically procured ATOS and 16 received transcranially procured ATOS. One failed case was observed, in the endoscopic procurement group. We did not observe a statistically significant difference between the two groups in failure rate. This study demonstrates equivalence of the clinical outcome of allograft tympanoplasty using either endoscopic or transcranial procured ATOS and therefore indicates that the endoscopic technique can be considered the new standard procurement technique. Especially because the endoscopic procurement technique has several advantages compared to the former transcranial procurement technique: it avoids risk of prion transmission and it is faster while lacking any noticeable incision.

  17. Hanford spent nuclear fuel hot conditioning system test procedure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cleveland, K.J.

    1997-09-16

    This document provides the test procedures for cold testing of the prototype Hot Conditioning System (HCS) at the 306E Facility. The primary objective of this testing is to confirm design choices and provide data for the detailed design package prior to procurement of the process equipment. The current scope of testing in this document includes a fabricability study of the HCS, equipment performance testing of the HCS components, heat-up and cool-down cycle simulation, and robotic arm testing.

  18. 40 CFR 86.1838-01 - Small volume manufacturer certification procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... paragraph (c)(2). (i) Small volume in-use verification test vehicles may be procured from customers or may... miles, a manufacturer may demonstrate to the satisfaction of the Agency that, based on owner survey data...

  19. 77 FR 1396 - Procurement of Commodities and Services Financed by USAID Federal Program Funds.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-10

    ... Agriculture Commodities, has been revised to state that USAID provides a list of restricted agricultural... salts, biologicals, and some in-vitro diagnostic reagents/test kits; but does not include devices or...

  20. Wheelchair Lifts on Transit Buses : Summary of U.S. Experience

    DOT National Transportation Integrated Search

    1983-01-01

    The overall objective of this project was to develop information and guidance for the transit industry concerning wheelchair lifts on transit buses in the areas of lift procurement, testing and acceptance, training, and maintenance.

  1. 76 FR 13880 - Disclosure of Return Information in Connection With Written Contracts Among the IRS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ..., maintenance, repair, testing, and procurement of equipment; and (3) the providing of other services. On March... Employment taxes, Estate taxes, Excise taxes, Gift taxes, Income taxes, Penalties, Reporting and...

  2. Transferring new technologies within the federal sector: The New Technology Demonstration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conover, D.R.; Hunt, D.M.

    1994-08-01

    The federal sector is the largest consumer of products in the United States and annually purchases almost 1.5 quads of energy measured at the building site at a cost of almost $10 billion (U.S. Department of Energy 1991). A review of design, construction, and procurement practices in the federal sector, as well as discussions with manufacturers and vendors, indicated that new technologies are not utilized in as timely a manner as possible. As a consequence of this technology transfer lag, the federal sector loses valuable energy and environmental benefits that can be derived through the application of new technologies. Inmore » addition, opportunities are lost to reduce federal energy expenditures and spur U.S. economic growth through the procurement of such technologies. In 1990, under the direction of the U.S. Department of Energy (DOE) Federal Energy Management Program, the Pacific Northwest Laboratory began the design of a program to accelerate the introduction of new U.S. technologies into the federal sector. Designated first as the Test Bed Demonstration Program and more recently the New Technology Demonstration Program, it sought to shorten the acceptance period of new technologies within the federal sector. By installing and evaluating various new technologies at federal facilities, the Program attempts to increase the acceptance of those new technologies through the results of {open_quotes}real-world{close_quotes} federal installations. Since that time, the Program has conducted new technology demonstrations and evaluations, evolved to address the need for more timely information transfer, and explored collaborative opportunities with other DOE offices and laboratories. This paper explains the processes by which a new technology demonstration project is implemented and presents a general description of the Program results to date.« less

  3. 22 CFR 226.46 - Procurement records.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement records. 226.46 Section 226.46 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.46 Procurement records...

  4. 76 FR 12016 - Local and Regional Food Aid Procurement Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... DEPARTMENT OF AGRICULTURE Foreign Agricultural Service Local and Regional Food Aid Procurement... field-based projects under the USDA Local and Regional Food Aid Procurement Pilot Project (USDA LRP..., 2011. FOR FURTHER INFORMATION CONTACT: Jamie Fisher, Chief, Local and Regional Procurement, Food...

  5. 48 CFR 2401.601-70 - Senior Procurement Executive.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Senior Procurement... Authority, and Responsibilities 2401.601-70 Senior Procurement Executive. Unless otherwise designated by the Secretary through a delegation of authority, the Chief Procurement Officer is the Department's Senior...

  6. 78 FR 20783 - Designation of Product Categories for Federal Procurement; Withdrawal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-08

    ... Designation of Product Categories for Federal Procurement; Withdrawal AGENCY: Office of Procurement and.... Department of Agriculture (USDA) is withdrawing the final rule ``Designation of Product Categories for... product categories within which biobased products will be afforded Federal procurement preference, was...

  7. 32 CFR 203.13 - Procurement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Procurement. 203.13 Section 203.13 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS... small businesses, and will be conducted as competitive procurements. Procurements below a value of $2...

  8. 48 CFR 702.170-13 - Procurement Executive.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Procurement Executive. 702.170-13 Section 702.170-13 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL DEFINITIONS OF WORDS AND TERMS Definitions 702.170-13 Procurement Executive. “Procurement...

  9. 10 CFR 436.43 - Procurement planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Procurement planning. 436.43 Section 436.43 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Agency Procurement of Energy Efficient Products § 436.43 Procurement planning. (a) Agencies should consider the...

  10. 23 CFR 172.5 - Methods of procurement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... proposal solicitation (project, task, or service) process shall be by public announcement, advertisement... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated...

  11. 32 CFR 516.58 - Policies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... LITIGATION Remedies in Procurement Fraud and Corruption § 516.58 Policies. (a) Procurement fraud and... administrative remedies in significant cases of fraud or corruption relating to Army procurement. (d) The key... of fraud or corruption involving procurement. (g) Coordination on the status and disposition of cases...

  12. Procuring interoperability at the expense of usability: a case study of UK National Programme for IT assurance process.

    PubMed

    Krause, Paul; de Lusignan, Simon

    2010-01-01

    The allure of interoperable systems is that they should improve patient safety and make health services more efficient. The UK's National Programme for IT has made great strides in achieving interoperability; through linkage to a national electronic spine. However, there has been criticism of the usability of the applications in the clinical environment. Analysis of the procurement and assurance process to explore whether they predetermine usability. Processes separate developers from users, and test products against theoretical assurance models of use rather than simulate or pilot in a clinical environment. The current process appears to be effective for back office systems and high risk applications, but too inflexible for developing applications for the clinical setting. For clinical applications agile techniques are more appropriate. Usability testing should become an integrated part of the contractual process and be introduced earlier in the development process.

  13. Ethics and regulation in organ procurement research.

    PubMed

    Ackerman, Terrence F; Winsett, Rebecca P

    2002-12-01

    This article explores the role of ethics and regulation in human research conducted by organ procurement agencies; basic ethical principles for human research are outlined. Organ procurement agencies are not required to observe federal regulations; however, voluntary adherence will ensure that procurement research is conducted according to current standards of ethical practice. Although most organ procurement research will qualify for exempt status, this determination should be made by an institutional review board. Even if studies qualify for exempt status, there is a moral presumption that informed consent should be sought, unless certain narrow conditions for waiver of consent are satisfied. Finally, when future research utilizing organ procurement records is anticipated, procurement coordinators should provide sufficiently detailed information to families about such plans to permit their advance informed consent to research activities.

  14. Value-based procurement of medical devices: Application to devices for mechanical thrombectomy in ischemic stroke.

    PubMed

    Trippoli, Sabrina; Caccese, Erminia; Marinai, Claudio; Messori, Andrea

    2018-03-01

    In the acute ischemic stroke, endovascular devices have shown promising clinical results and are also likely to represent value for money, as several modeling studies have shown. Pharmacoeconomic evaluations in this field, however, have little impact on the procurement of these devices. The present study explored how complex pharmacoeconomic models that evaluate effectiveness and cost can be incorporated into the in-hospital procurement of thrombectomy devices. As regards clinical modeling, we extracted outcomes at three months from randomized trials conducted for four thrombectomy devices, and we projected long-term results using standard Markov modeling. In estimating QALYs, the same model was run for the four devices. As regards economic modeling, we firstly estimated for each device the net monetary benefit (NMB) per patient (threshold = $60,000 per QALY); then, we simulated a competitive tender across the four products by determining the tender-based score (on a 0-to-100 scale). Prices of individual devices were obtained from manufacturers. Extensive sensitivity testing was applied to our analyses. For the four devices (Solitaire, Trevo, Penumbra, Solumbra), QALYs were 1.86, 1.52, 1,79, 1.35, NMB was $101,824, $83,546, $101,923, $69,440, and tender-based scores were 99.70, 43.43, 100, 0, respectively. Sensitivity analysis confirmed findings from base-case. Our results indicate that, in the field of thrombectomy devices, incorporating the typical tools of cost-effectiveness into the processes of tenders and procurement is feasible. Bridging the methodology of cost-effectiveness with the every-day practice of in-hospital procurement can contribute to maximizing the health returns that are generated by in-hospital expenditures for medical devices. Copyright © 2018 Elsevier B.V. All rights reserved.

  15. Challenging Pneumatic Requirements for Acoustic Testing of the Cryogenic Second Stage for the New Delta 3 Rocket

    NASA Technical Reports Server (NTRS)

    Webb, Andrew T.

    1998-01-01

    The paper describes the unique pneumatic test requirements for the acoustic and shock separation testing of the Second Stage for the new Delta III Rocket at the Goddard Space Flight Center in Greenbelt, Maryland. The testing was conducted in the 45,000 cu ft (25-feet wide by 30-feet deep by 50-foot high) Acoustic Facility. The acoustic testing required that the liquid oxygen (LOX) and liquid hydrogen (LH2) tanks be filled with enough liquid nitrogen (LN2) to simulate launch fuel masses during testing. The challenge for this test dealt with designing, procuring, and fabricating the pneumatic supply systems for quick assembly while maintaining the purity requirements and minimizing costs. The pneumatic systems were designed to fill and drain the both LOX and LH2 tanks as well as to operate the fill/drain and vent valves for each of the tanks. The test criteria for the pneumatic sub-systems consisted of function, cleanliness, availability, and cost. The first criteria, function, required the tanks to be filled and drained in an efficient manner while preventing them from seeing pressures greater than 9 psig which would add a pressure cycle to the tank. An LN2 tanker, borrowed from another NASA facility, served as the pre-cool and drain tanker. Pre-cooling the tanks allowed for more efficient and cost effective transfer from the LN2 delivery tankers. Helium gas, supplied from a high purity tube trailer, was used to pressurize the vapor space above the LN2 pushing it into the drain tanker. The tube trailer also supplied high pressure helium to the vehicle for valve control and component purges. Cleanliness was maintained by proper component selection, end-use particle filtration, and any on-site cleaning determined necessary by testing. In order to meet the availability/cost juggling act, products designed for LOX delivery systems were procured to ensure system compatibility while off the shelf valves and tubing designed for the semiconductor industry were procured for the gas systems.

  16. The Tanzania experience: clinical laboratory testing harmonization and equipment standardization at different levels of a tiered health laboratory system.

    PubMed

    Massambu, Charles; Mwangi, Christina

    2009-06-01

    The rapid scale-up of the care and treatment programs in Tanzania during the preceding 4 years has greatly increased the demand for quality laboratory services for diagnosis of HIV and monitoring patients during antiretroviral therapy. Laboratory services were not in a position to cope with this demand owing to poor infrastructure, lack of human resources, erratic and/or lack of reagent supply and commodities, and slow manual technologies. With the limited human resources in the laboratory and the need for scaling up the care and treatment program, it became necessary to install automated equipment and train personnel for the increased volume of testing and new tests across all laboratory levels. With the numerous partners procuring equipment, the possibility of a multitude of equipment platforms with attendant challenges for procurement of reagents, maintenance of equipment, and quality assurance arose. Tanzania, therefore, had to harmonize laboratory tests and standardize laboratory equipment at different levels of the laboratory network. The process of harmonization of tests and standardization of equipment included assessment of laboratories, review of guidelines, development of a national laboratory operational plan, and stakeholder advocacy. This document outlines this process.

  17. 7 CFR 1778.22 - Planning development and procurement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Planning development and procurement. 1778.22 Section 1778.22 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE... Planning development and procurement. Planning development and procurement for grants made under this part...

  18. Procurement Career Management Handbook.

    ERIC Educational Resources Information Center

    Department of the Treasury, Washington, DC.

    This handbook is the result of the Treasury Department's efforts to increase professionalism among its procurement employees nationwide through its Procurement Career Management Program. First, the scope and objectives of the Procurement Career Management Program are discussed. The remaining sections of the handbook deal with the following program…

  19. 32 CFR 553.11 - Procurement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 3 2014-07-01 2014-07-01 false Procurement. 553.11 Section 553.11 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES ARMY NATIONAL CEMETERIES § 553.11 Procurement. Cemetery supplies and services will be procured in...

  20. 48 CFR 2804.602 - Federal Procurement Data System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data... close of the fourth quarter. Specific preparation procedures are contained in the FPDS Reporting Manual...

  1. 48 CFR 2804.602 - Federal Procurement Data System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data... close of the fourth quarter. Specific preparation procedures are contained in the FPDS Reporting Manual...

  2. 48 CFR 2804.602 - Federal Procurement Data System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...

  3. 48 CFR 2804.602 - Federal Procurement Data System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...

  4. 48 CFR 2804.602 - Federal Procurement Data System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...

  5. Proceedings: 1990 EPRI gas turbine procurement seminar

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDonald, B.L.; Miller, M.N.

    1991-06-01

    This seminar presents information that enables utilities to implement more cost-effective procurements for gas turbine and combined-cycle power generation equipment. A systematic approach to specification and permitting procedures can lower unit life-cycle cost. APPROACH. Thirty-two staff members from 25 utilities met in Danvers, Massachusetts, October 9--11, 1990. Speakers representing utilities, vendors, and EPRI contractors presented material on recent procurement and startup experiences, permitting considerations, specification strategy, bid evaluation techniques, and a vendor's perspective of utility procurements. KEY POINTS. The seminar focused on specification features, procurement procedures, and bid evaluation techniques designed to implement life-cycle cost-effective procurement consistent with the plantmore » mission. Speakers highlighted the following issues: Experiential case histories of recent procurements and startups, emphasizing how to design procurement procedures that improve plant operating economics; Current trends in permitting for NO{sub x} compliance and recent permitting experience; Quantifiable evaluations of vendors' bids for RAM-related characteristics; The means to obtain specifically desired but nonstandard equipment features.« less

  6. Dependence and power in healthcare equipment supply chains.

    PubMed

    de Jong, Jurriaan L; Benton, W C

    2018-03-05

    Most healthcare organizations (HCOs) engage Group Purchasing Organizations (GPOs) as an outsourcing strategy to secure their supplies and materials. When an HCO outsources the procurement function to a GPO, this GPO will directly interact with the HCO's supplier on the HCO's behalf. This study investigates how an HCO's dependence on a GPO affects supply chain relationships and power in the healthcare medical equipment supply chain. Hypotheses are tested through factor analysis and structural equation modeling, using primary survey data from HCO procurement managers. An HCO's dependence on a GPO is found to be positively associated with a GPO's reliance on mediated power, but, surprisingly, negatively associated with a GPO's mediated power. Furthermore, analysis indicates that an HCO's dependence on a GPO is positively associated with an HCO's dependence on a GPO-contracted Original Equipment Manufacturer (OEM). HCO reliance on GPOs may lead to a buyer's dependence trap, where HCOs are increasingly dependent on GPOs and OEMs. Implications for HCO procurement managers and recommended steps for mitigation are offered. Power-dependence relationships in the medical equipment supply chain are not consistent with relationships in other, more traditional, supply chains. While dependence in a supply chain relationship typically leads to an increase in reliance on mediated power, GPO-dependent HCOs instead perceive a decrease in GPO mediated power. Furthermore, HCOs that rely on procurement service from GPOs are increasingly dependent on the OEMs.

  7. Organ donor screening practices for Strongyloides stercoralis infection among US organ procurement organizations.

    PubMed

    Abanyie, Francisca A; Valice, Emily; Delli Carpini, Kristin W; Gray, Elizabeth B; McAuliffe, Isabel; Chin-Hong, Peter V; Handali, Sukwan; Montgomery, Susan P; Huprikar, Shirish

    2018-03-07

    Targeted donor screening for strongyloidiasis performed at the time of organ procurement can prevent this life-threatening donor-derived infection. The Association of Organ Procurement Organizations surveyed members to determine the number of US organ procurement organizations (OPOs) performing donor screening for Strongyloides infection and their screening practices. All 58 OPOs responded to the survey. Only 6 (10%) currently screen donors for strongyloidiasis; most OPOs started 6-36 months before the survey and one started 6 years prior. All used risk-based criteria to determine which donors to screen, though the criteria varied among OPOs. A median of 56 donors have been screened at each OPO since initiating their screening programs, with a median of 2 infected donors (range 0-13) identified. Overall, 53 organs have been transplanted from 22 infected donors, including hearts, lungs, kidneys, and livers. Of 52 OPOs not currently screening, 20 had considered screening and one plans to start screening in the near future. Of those considering risk-based screening, most had not decided on the criteria. Uncertainty about the benefits of and guidelines for screening and misconceptions about the interpretation of test results were concerns shared by non-screening OPOs. Continued education and advocacy on the importance of targeted donor screening are needed. Published 2018. This article is a U.S. Government work and is in the public domain in the USA.

  8. Survey of U.S. Organ Procurement Organizations Regarding Pediatric Organ Donor Management.

    PubMed

    Ream, Robert S; Armbrecht, Eric S

    2016-10-01

    To describe the current practice of pediatric organ donor management in the United States for donors declared dead based upon neurologic criteria. The study directs particular attention to how pediatric donors are defined, the use of donor management guidelines, the use of donor management goals, and the involvement of pediatric critical care or transplantation expertise. Cross-sectional observational study using a web-based survey and follow-up telephone interview with respondents from U.S. organ procurement organizations. The study also incorporated organ procurement organization-specific data on organ yield for the 4-year period (2010-2013) preceding the study. The 58 U.S. organ procurement organizations. Respondents chosen by each organ procurement organization. None. All 58 U.S. organ procurement organizations participated in the study. Fifty-two respondents (90%) indicated that their organ procurement organization distinguished pediatric from adult donors resulting in 28 unique pediatric definitions. Thirty-nine organ procurement organizations utilized some form of written pediatric management guidelines, and 27 (47%) maintained pediatric donor management goals; compliance was infrequently monitored for both guidelines (28%) and goals (33%). A pediatric intensivist was always or usually involved in pediatric donor management at 47 organ procurement organizations (81%); transplant/organ recovery surgeons were always or usually involved at 12 organ procurement organizations (21%). There was an increase in the number of organs transplanted per donor among donors 11-17 years old for organ procurement organizations that used donor management goals for the duration of the period studied (p < 0.01). There was also an increase in the ratio of observed/expected organs transplanted among donors of 0-10 years old for organ procurement organizations that always or usually consulted a transplant/organ recovery surgeon (p = 0.02) although this did not reach our threshold for statistical significance.. There is little consensus among organ procurement organizations regarding the definition of "pediatric" during organ donor management. Most organ procurement organizations employ written pediatric guidelines and use pediatric intensive care physicians for assistance in managing these donors. There is a positive association between the use of donor management goals and organ yield among pediatric donors in the 11- to 17-year age group.

  9. Effects of procurement practices on quality of medical device or service received: a qualitative study comparing countries.

    PubMed

    Lingg, Myriam; Wyss, Kaspar; Durán-Arenas, Luis

    2016-08-08

    We know little about how procurement of a high-risk medical device (HRMD) affects clinical practice and outcomes. In health systems in high-income countries, and specifically those that maintain a national arthroplasty registry, procurement decisions are frequently guided by long-term clinical results, with the goal of ensuring at least standard quality of HRMDs. But in countries like Mexico, decision-making is often dominated by lowest acquisition price. We set out to study the impact of procurement for orthopaedic HRMDs on clinical procedures and outcomes. We based our qualitative study on 59 in-depth interviews with stakeholders from Mexico, Switzerland, Germany, and UK: orthopaedic specialists, government officials, other experts, and social security system managers or administrators. We took a healthcare delivery approach to capturing and comparing factors that affected the regulations of HRMDs and procurement processes, and to understanding connections between procurement and clinical practice. Our findings demonstrate for procurement processes that the three European countries compared to Mexico don't have similar concerns with regards to their procurement processes. Deficiencies of procurement regulations and practices identified from representatives in Mexico were almost absent in European countries. We identified three areas of deficiency: 1) HRMD regulations based on insufficiently robust clinical evidence (mainly noted by European countries); 2) Follow-up on Health Technology Assessments is inadequate (noted by Mexico) and methodology not always good enough (noted by European countries); and, 3) Lowest-acquisition price often guides procurement decisions and thus may not align with needs of clinical procedures (noted by Mexico and some European countries). Procurement processes for orthopaedic HRMDs may have an impact on clinical procedures and outcomes. A favourable approach is one where orthopaedic specialists are parties to the procurement process, and post-market surveillance data informs decision-making. Actors in the procurement process can improve their impact on clinical procedures and outcomes by developing specific strategies that better align the needs of both, procurement and clinical procedures.

  10. Toward a Framework for Dynamic Service Binding in E-Procurement

    NASA Astrophysics Data System (ADS)

    Ashoori, Maryam; Eze, Benjamin; Benyoucef, Morad; Peyton, Liam

    In an online environment, an E-Procurement process should be able to react and adapt in near real-time to changes in suppliers, requirements, and regulations. WS-BPEL is an emerging standard for process automation, but is oriented towards design-time binding of services. This missing issue can be resolved through designing an extension to WS-BPEL to support automation of flexible e-Procurement processes. Our proposed framework will support dynamic acquisition of procurement services from different suppliers dealing with changing procurement requirements. The proposed framework is illustrated by applying it to health care where different health insurance providers could be involved to procure the medication for patients.

  11. Potential fraudulent behaviors in e-procurement implementation in Indonesia

    NASA Astrophysics Data System (ADS)

    Huda, S. N.; Setiani, N.; Pulungan, R.; Winarko, E.

    2017-03-01

    Corruptions in public procurement have occurred in various parts of the world, especially in developing countries. Implementation of SPSE (electronic procurement system) as the e-procurement system in Indonesia is based on the government’s intentions towards clean and good governance by fighting corruption, collusion, and nepotism. Procurement in Indonesia is carried out through SPSE, which is developed by LKPP (Government Policy on Procurement of Goods/Services). Although this system has brought many positive effects, there are still found many practices of fraud occurring in the implementation of the system. In this paper, we try to identify these practices and then to systematically categorize and analyze them.

  12. Incidence of bacterial contamination and predisposing factors during bone and tendon allograft procurement.

    PubMed

    Terzaghi, Clara; Longo, Alessia; Legnani, Claudio; Bernasconi, Davide Paolo; Faré, Maristella

    2015-03-01

    The aim of this study was to analyze factors contributing to bacteriological contamination of bone and tendon allograft. Between 2008 and 2011, 2,778 bone and tendon allografts obtained from 196 organ and tissue donors or tissue donors only were retrospectively analysed. Several variables were taken into account: donor type (organ and tissue donors vs. tissue donor), cause of death, time interval between death and tissue procurement, duration of the procurement procedure, type of allografts, number of team members, number of trainees members, associated surgical procedures, positivity to haemoculture, type of procurement. The overall incidence of graft contamination was 23 %. The cause of death, the procurement time, the duration of procurement, the associated surgical procedures were not associated with increased risk of contamination. Significant effect on contamination incidence was observed for the number of staff members performing the procurement. In addition, our study substantiated significantly higher contamination rate among bone allografts than from tendon grafts. According to these observations, in order to minimize the contamination rate of procured musculoskeletal allografts, we recommend appropriate donor selection, use of standard sterile techniques, immediate packaging of each allograft to reduce graft exposure. Allograft procurement should be performed by a small surgical team.

  13. 78 FR 11646 - Public Availability of Federal Election Commission, Procurement Division FY 2012 Service Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...

  14. 78 FR 77450 - Public Availability of Federal Election Commission, Procurement Division FY2013 Service Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...

  15. 77 FR 14522 - Public Availability of Federal Election Commission, Procurement Division FY 2011 Service Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...

  16. 41 CFR 101-26.501-5 - Procurement time schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedules. 101-26.501-5 Section 101-26.501-5 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...

  17. 77 FR 65500 - Extension of Suspension and Debarment Exclusions, Grants and Cooperative Agreements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... Government procurement. William P. McNally, Assistant Administrator for Procurement. Accordingly, 2 CFR Part... proposes to extend coverage of nonprocurement suspension and debarment to all-tier procurement and non-procurement actions under all grants and cooperative agreements. DATES: Interested parties should submit...

  18. 76 FR 74755 - Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... DEPARTMENT OF AGRICULTURE 48 CFR Part 422 RIN 0599-AA19 Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law Violations AGENCY: Office of Procurement and Property Management, Department of Agriculture. ACTION: Proposed rule. SUMMARY: The Office of Procurement...

  19. 78 FR 70022 - Procurement List; Proposed Additions and Deletions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    .... ACTION: Proposed Additions to and Deletions from the Procurement List. SUMMARY: The Committee is proposing to add products and a service to the Procurement List that will be furnished by nonprofit agencies... the Procurement List for production by the nonprofit agencies listed: Products Kit, Paint...

  20. 77 FR 60969 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... Procurement List. Notice Correction: On 9/28/2012 (77 FR 59595), the Committee for Purchase From People Who Are Blind or Severely Disabled published a notice for additions to the Procurement List with the... and services to the Procurement List that will be furnished by nonprofit agencies employing persons...

  1. 75 FR 1355 - Procurement List Additions and Deletions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ...: Additions to and deletions from Procurement List. SUMMARY: This action adds to the Procurement List services... disabilities, and deletes from the Procurement List products and services previously furnished by such agencies... [email protected] . SUPPLEMENTARY INFORMATION: Additions On 11/6/2009 (74 FR 57453-57454), the...

  2. 76 FR 78248 - Procurement List; Addition and Deletions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    .... Service Type/Location: Laundry Service, Stratton Medical Center, 113 Holland Ave, Albany, NY. [[Page 78249...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...

  3. 24 CFR 84.84 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Procurement standards. 84.84... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Use of Lump Sum Grants § 84.84 Procurement standards. (a) Purpose of procurement standards. Paragraphs (b) through (i) of this section set forth...

  4. 7 CFR 235.9 - Procurement and property management standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Federal authority that has proper jurisdiction. (c) Procurement procedure. The State agency may use its... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management standards. 235.9... Procurement and property management standards. (a) Requirements. State agencies shall comply with the...

  5. Contribution by Departments of Forensic Medicine to Tissue Donation for Transplant Purposes.

    PubMed

    Malm, Torsten; Sandgren Åkerman, Åsa; Greby, Jesper; Odö, Björn; Henriksson, Bengt-Åke

    2016-12-01

    A department of forensic medicine (DFM) can be a valuable source for tissue donation, but logistics can prove difficult to overcome as it pertains to obtaining tissues for donation. This article describes the potential of tissues that can be procured for transplantation. Sweden has 9.7 million inhabitants, with an annual mortality rate of 90 000 and 5500 medicolegal autopsies per year. Cooperation between tissue banking and 2 DFMs began in the mid-1980s. Recently, cooperation has expanded to include all six DFMs. All tissue establishments (TEs) were asked to complete a questionnaire concerning their cooperation with DFMs from 2011 through 2013. A total of 298 actual donors were identified; 1090 tissues were procured including cardiovascular tissue, cornea, sclera, ear bones, and skin for transplantation. Of the tissues distributed, 553 were for transplantation and 72 for other medical purposes. Twenty-three percent of the tissues were discarded. Reasons for tissue rejection included deficient tissue quality (65%), positive serology tests (9%), positive bacteriology tests after decontamination procedures (7%), technical errors (<1%), and other reasons (18%). Nineteen percent of all tissues distributed for transplantation came from donors in DFMs. The cooperation between DFMs and TEs was described as well functioning and excellent. Education and national courses in tissue procurement for employees in DFMs are contributing factors to such positive interactions. The support from the National Board of Forensic Medicine is an important factor for sustainable progress.

  6. Production of Copper-Plated Beamline Bellows and Spools for LCLS-II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, Katherine M.; Carpenter, Brian C.; Daly, Ed

    The SLAC National Accelerator Laboratory is currently constructing a major upgrade to its accelerator, the Linac Coherent Light Source II (LCLS-II). Several Department of Energy national laboratories, including the Thomas Jefferson National Accelerator Facility (JLab) and Fermi National Accelerator Laboratory (FNAL), are participating in this project. The 1.3-GHz cryomodules for this project consist of eight cavities separated by bellows (expansion joints) and spools (tube sections), which are copper plated for RF conduction. JLab is responsible for procurement of these bellows and spools, which are delivered to JLab and FNAL for assembly into cryomodules. Achieving accelerator-grade copper plating is always amore » challenge and requires careful specification of requirements and application of quality control processes. Due to the demanding technical requirements of this part, JLab implemented procurement strategies to make the process more efficient as well as provide process redundancy. This paper discusses the manufacturing challenges that were encountered and resolved, as well as the strategies that were employed to minimize the impact of any technical issues.« less

  7. Passive cooling and heating program at Oak Ridge National Laboratory for FY-1981

    NASA Astrophysics Data System (ADS)

    Shapira, H. B.; Kaplan, S. I.; Chester, C. V.

    Construction was completed of an earth-sheltered, passively solar heated office-dormitory, the Joint Institute for Heavy Ion Research, designed at ORNL. Instrumentation of the building was designed, procured, and installed. Building performance will be monitored and compared with predictions of the DOE-2 code. A study of the incorporation of vegetation on architecture was conducted by the Harvard School of Design. A final report was issued which is a prototype handbook for the use of vegetation to reduce cooling loads in structures. An experiment to reduce the cooling requirement of mobile homes by shading with fast-growing vines was begun: a maintenance-oriented trellis was constructed and vines were planted. An RFP for the production of a prototype set of reflective insulating blinds was issued.

  8. 41 CFR 101-26.507-2 - Procurement time schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedule. 101-26.507-2 Section 101-26.507-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...

  9. 78 FR 18876 - Defense Federal Acquisition Regulation Supplement: United States-Korea Free Trade Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... Agreement. The Republic of Korea is already party to the World Trade Organization Government Procurement...) Agreement on Government Procurement (GPA). Although the rule now opens up Government procurement to the... 48 CFR Parts 225 and 252 Government procurement. Kortnee Stewart, Editor, Defense Acquisition...

  10. 10 CFR 1021.216 - Procurement, financial assistance, and joint ventures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... a decision on proposals and will include: (1) A brief discussion of the purpose of the procurement... 10 Energy 4 2010-01-01 2010-01-01 false Procurement, financial assistance, and joint ventures... POLICY ACT IMPLEMENTING PROCEDURES DOE Decisionmaking § 1021.216 Procurement, financial assistance, and...

  11. 42 CFR 413.200 - Payment of independent organ procurement organizations and histocompatibility laboratories.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Payment of independent organ procurement... SKILLED NURSING FACILITIES Payment for End-Stage Renal Disease (ESRD) Services and Organ Procurement Costs § 413.200 Payment of independent organ procurement organizations and histocompatibility laboratories. (a...

  12. 7 CFR 225.17 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Procurements by public sponsors comply with applicable State or local laws and the standards set forth in 7 CFR part 3016; and (2) Procurements by private nonprofit sponsors comply with standards set forth in 7 CFR... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement standards. 225.17 Section 225.17...

  13. 77 FR 37659 - Procurement List; Proposed Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... additions to the procurement list. SUMMARY: The Committee is proposing to add products and services to the...- 598-5067 and 1670-01-598-5071 to its Procurement List. The Coverage statement associated with this... connection with the products and services proposed for addition to the Procurement List. Comments on this...

  14. 32 CFR 37.1330 - Procurement contract.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in This Part § 37.1330 Procurement contract. A Federal Government procurement contract. It is a legal instrument which, consistent with 31 U.S... 32 National Defense 1 2010-07-01 2010-07-01 false Procurement contract. 37.1330 Section 37.1330...

  15. 10 CFR 603.1300 - Procurement contract.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Used in this Part § 603.1300 Procurement contract. A Federal Government procurement contract. It is a... 10 Energy 4 2010-01-01 2010-01-01 false Procurement contract. 603.1300 Section 603.1300 Energy... Government and a State, a local government, or other non-government entity when the principal purpose of the...

  16. 31 CFR 19.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Are any procurement contracts....220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2...

  17. 29 CFR 98.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Are any procurement contracts included as covered... SUSPENSION (NONPROCUREMENT) Covered Transactions § 98.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded...

  18. 29 CFR 98.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Are any procurement contracts included as covered... SUSPENSION (NONPROCUREMENT) Covered Transactions § 98.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded...

  19. 29 CFR 1471.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 4 2011-07-01 2011-07-01 false Are any procurement contracts included as covered... Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do...

  20. 29 CFR 1471.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Are any procurement contracts included as covered... Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do...

  1. 48 CFR 2406.304-70 - Approval of the justification-field procurements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Other Than Full and Open Competition 2406.304-70 Approval of the justification—field procurements. (a) The justification for other than full and open competition for field procurements shall be approved in... justification-field procurements. 2406.304-70 Section 2406.304-70 Federal Acquisition Regulations System...

  2. 20 CFR 627.420 - Procurement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Procurement. 627.420 Section 627.420... PROGRAMS UNDER TITLES I, II, AND III OF THE ACT Administrative Standards § 627.420 Procurement. (a) General. (1) For purposes of this section, the term procurement means the process which leads to any award of...

  3. Development of a Procurement Management Framework in Ghana: A New Paradigm for Interdisciplinary Postgraduate Education

    ERIC Educational Resources Information Center

    Owusu-Manu, D.; Badu, E.; Edwards, D. J.

    2011-01-01

    Procurement in the corporate world is increasingly complex, multi-faceted and interdisciplinary. This paper explores existing knowledge specifications relating to procurement management competencies and proposes a new procurement management competency framework (PMCF) and a competency-based postgraduate programme for postgraduate students in…

  4. Information Requirements for a Procurement Management Information System.

    DTIC Science & Technology

    1975-08-01

    Management Information System is...described and some justification for this type of procurement management information system is presented. A literature search was made to determine...information systems. If information requirements are correctly identified and satisfied by a procurement management information system , contract administration and procurement management can be

  5. Department of the Army Justification of Estimates for Fiscal Year 1984, Procurement Appropriations-Construction Program Submitted to Congress January 1983.

    DTIC Science & Technology

    1983-01-01

    unloaded through the bottom discharge gates of the railtoad cars, into a portable conveyor , to a front end loader and then to the pile. A bulldozer than...locomotive to move the cars. At the Powerhouse, the coal is unloaded througb the railroad car discharge gates and into a bucket conveyor that carries the...structures by design are semi-permanent, i.e., they can be dismantled andelastalled elsewhere. Protection must be provided for these structures. P# : a

  6. Development of the Pipe Loop System for Determining Effectiveness of Corrosion Control Chemicals in Potable Water Systems

    DTIC Science & Technology

    1988-08-01

    OFFICE SYMBOL 7a NAME OF MONITORING ORGANIZATION U.S. Army Construction (if applicable) Engr Research Laboratory CECER-EN 6c. ADDRESS (City, State...and ZIP Code) 7b ADDRESS (City, State, and ZIP Code) P.O. Box 4005 Champaign, IL 61821 8a. NAME OF FUNDING/SPONSORING 8b OFFICE SYMBOL 9 PROCUREMENT...NAME OF RESPONSIBLE INDIVIDUAL 22b TELEPHONE (Include Area Code) 22c OFFICE SYMBOL Jane Andrew 1(217) 352-6511, x388 CECER-IMT DD FORM 1473. 84 MAR 83

  7. NRC assessment of improvements in licensee procurement and dedication programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grimes, B.K.; Potapovs, U.; Campbell, L.L.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) recently conducted a series of on-site assessments at selected nuclear plants to review improvements that the licenses had made to their procurement and dedication activities. The assessments included an evaluation of the progress made by licensees to strengthen their commercial-grade dedication programs to comply with 10CRF50, Appendix B, and to implement the comprehensive procurement improvements suggested in Nuclear Management and Resource Council (NUMARC) publication 901-3. This paper discusses the overall purpose of the assessments, procurement areas assessed, major strengths and weaknesses identified in licensee procurement programs, and the NRC's perspective of the industry's responsemore » to NUMARC procurement initiatives.« less

  8. Progress in Design and Construction of the Optical Communications Laser Laboratory

    NASA Technical Reports Server (NTRS)

    Wilson, K. E.; Britcliffe, M.; Golshan, N.

    1999-01-01

    The deployment of advanced hyperspectral imaging and other Earth sensing instruments on board Earth observing satellites is driving the demand for high-data-rate communications. Optical communications meet the required data rates with small, low mass, and low-power communications packages. JPL, as NASA's lead center in optical communications, plans to construct a 1-m Optical Communications Telescope Laboratory (OCTL) at its Table Mountain Facility (TMF) complex in the San Gabriel Mountains of Southern California. The design of the building has been completed, and the construction contractor has been selected. Ground breaking is expected to start at the beginning of the 1999 TMF construction season. A request for proposal (RFP) has been issued for the procurement of the telescope system. Prior to letting the RFP we conducted a request for information with industry for the telescope system. Several vendors responded favorably and provided information on key elements of the proposed design. These inputs were considered in developing the final requirements in the RFP. Keywords: Free space optical communications, lasercom, telescopes, ground stations, adaptive optics, astrometry, Table Mountain Facility

  9. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  10. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  11. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  12. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  13. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  14. Greening Operations Management: An Online Sustainable Procurement Course for Practitioners

    ERIC Educational Resources Information Center

    Walker, Helen L.; Gough, Stephen; Bakker, Elmer F.; Knight, Louise A.; McBain, Darian

    2009-01-01

    In the Operations Management field, sustainable procurement has emerged as a way to green the purchasing and supply process. This paper explores issues in sustainable procurement training. The authors formed an interdisciplinary team to design, deliver and evaluate a training programme to promote and develop sustainable procurement in the United…

  15. 13 CFR 121.409 - What size standard applies in an unrestricted procurement for Certificate of Competency purposes?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... unrestricted procurement for Certificate of Competency purposes? 121.409 Section 121.409 Business Credit and... an unrestricted procurement for Certificate of Competency purposes? For the purpose of receiving a Certificate of Competency in an unrestricted procurement, the applicable size standard is that corresponding...

  16. The NGST Science Instrument Procurement Plan

    NASA Astrophysics Data System (ADS)

    Greenhouse, M. A.; NGST Project Office Team

    1998-12-01

    We display the top level plan for procurement of science instruments for NGST. The procurement process and time line schedule leading to a NASA AO solicitation for flight instruments is presented and discussed. This procurement schedule includes important milestones that will be reached during 1999 and that are of potential interest to NGST instrument offerors.

  17. 22 CFR 208.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  18. 22 CFR 208.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  19. 22 CFR 1508.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  20. 5 CFR 919.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Are any procurement contracts included as...) Covered Transactions § 919.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency...

Top