Sample records for procurement programs aircraft

  1. Guidebook for preparation of aircraft-system survivability requirements for procurement documents. Final report, October 1975-October 1976

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morrow, J.J.; Burris, R.A.; Watson, D.J.

    1977-05-01

    This report is intended to provide guidelines for the preparation of procurements specifications for aircraft survivability enhancement equipment, for the survivability/vulnerability (S/V) tasks associated with the procurement of a total aircraft system or its relate subsystems, and also for the modification of current fleet aircraft to their related subsystems. It is intended that these S/V procurement guidelines be applied to the procurement of all military aircraft, aircraft subsystems, and aircraft componenets which can either lose their functional capability of have their performance degraded as a result of interactions with the damage mechanisms of threat weapons. The guidelines should be appliedmore » to preliminary design programs, to production programs, and to programs that will retrofit or modify existing systems. These guidelines include general requirements statements for the establishment of an S/V program, requirements statements for reducing the susceptibility of the system to the threat weapons, and requirements for the reduction of vulnerability to nonnuclear, nuclear, and laser weapon effects. Requirements for S/V assessments and the verification of vulnerability levels and survival enhancement features are also included. Although nuclear and laser weapon effects are included, the major emphasis is on the reduction of susceptibility and vulnerability to conventional weapons and the establishment of the S/V program.« less

  2. Department of the Navy Justification of Estimates for Fiscal Year 1985. Submitted to Congress February 1984. Procurement, Aircraft Procurement, Navy

    DTIC Science & Technology

    1984-02-01

    for tactical air power projection. The F/A-18 will replace aging F-4 and A-7 aircraft. The total programed procurement of F/A-18 aircraft is 1,377...inner zone anti-submarine .arfars helicopter which is needed to modernize aging CV assets. P-3C (Patrol) ORION (Dollars in Millions) FY 1985 FY 1986...tE MAVERICK modification. By modifying the Armament Station Control Unit ( ASCU ), procuring single rail launchers (iAU-117) and interfacing MAVERICT

  3. Procurement Practices for the Composite Armored Vehicle and Composite Affordability Initiative Programs

    DTIC Science & Technology

    1999-10-26

    The audit objective was to determine whether violations of procurement regulations occurred regarding procurement of selected components of the Army...Crusader vehicle and the Joint Strike Fighter aircraft. However, during the audit , we determined that the allegations involved the Army Composite

  4. 41 CFR 101-26.602-1 - Procurement of lubricating oils, greases, and gear lubricants.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (nonaircraft) equipment and of aircraft engine oils on an annual program basis. Estimates of requirements for... program Due on or before Lubricating oils (nonaircraft) 4.1 November 15. Aircraft engine oils 4.2 June 15... lubricating oils, greases, and gear lubricants. 101-26.602-1 Section 101-26.602-1 Public Contracts and...

  5. 41 CFR 101-26.602-1 - Procurement of lubricating oils, greases, and gear lubricants.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (nonaircraft) equipment and of aircraft engine oils on an annual program basis. Estimates of requirements for... program Due on or before Lubricating oils (nonaircraft) 4.1 November 15. Aircraft engine oils 4.2 June 15... lubricating oils, greases, and gear lubricants. 101-26.602-1 Section 101-26.602-1 Public Contracts and...

  6. 41 CFR 101-26.602-1 - Procurement of lubricating oils, greases, and gear lubricants.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (nonaircraft) equipment and of aircraft engine oils on an annual program basis. Estimates of requirements for... program Due on or before Lubricating oils (nonaircraft) 4.1 November 15. Aircraft engine oils 4.2 June 15... lubricating oils, greases, and gear lubricants. 101-26.602-1 Section 101-26.602-1 Public Contracts and...

  7. 41 CFR 101-26.602-1 - Procurement of lubricating oils, greases, and gear lubricants.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (nonaircraft) equipment and of aircraft engine oils on an annual program basis. Estimates of requirements for... program Due on or before Lubricating oils (nonaircraft) 4.1 November 15. Aircraft engine oils 4.2 June 15... lubricating oils, greases, and gear lubricants. 101-26.602-1 Section 101-26.602-1 Public Contracts and...

  8. 41 CFR 101-26.602-1 - Procurement of lubricating oils, greases, and gear lubricants.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (nonaircraft) equipment and of aircraft engine oils on an annual program basis. Estimates of requirements for... program Due on or before Lubricating oils (nonaircraft) 4.1 November 15. Aircraft engine oils 4.2 June 15... lubricating oils, greases, and gear lubricants. 101-26.602-1 Section 101-26.602-1 Public Contracts and...

  9. Department of the Army Justification of Estimates for Fiscal Year 1985 Submitted to Congress February 1984, Procurement, Programs, Aircraft, Missiles, Weapons & Tracked Combat Vehicles. Part 1. Aircraft

    DTIC Science & Technology

    1984-02-01

    1,813,700 2,184,600 1,835,000 Direct Obligation Section 1 - PURPOSE AND SCOPE Provides for procurement and manufacture of airplates, helicopters, and...installation unless the item is furnished to a manufacturer , who provides parts and labor under a single contract (excluding normal GFE). This...of $17.0 milion is requested in FY 1985 to fund long leand items associated with the JOINT STABS ground stations, These ground stations will provide

  10. Department of Defense Annual Report to Congress on Defense Acquisition Challenge Program for FY 2006

    DTIC Science & Technology

    2007-06-01

    Synthetic Instrument Measurement and Stimulus System – Improves aircraft avionics and electronic attack pod testing to expedite repair of critical...integration into CIWS • Navy requirement Cancelled / Not procured Air Force (4 Projects) • Quiet Eyes • On Aircraft (B-2) Laser Additive...System • Met Requirement/Rolled into FY07 Cost Effective Light Aircraft Missile Protect DAC for Army, Navy and Air Force helicopters • Did Not

  11. Department of the Air Force Justification of Estimates for Fiscal Year 1983 Submitted to Congress February 1982. Aircraft Procurement, Missile Procurement, Other Procurement

    DTIC Science & Technology

    1982-02-01

    SUPPORT EQUIP. .1 TOTAL 2 1.4 190 4.5 82 2.1 274 8.c METTHOD OF IIIPLE14ENTATIOI: IIUSTALLATION -. DEPOT/FIELD TEAl! LEAD TI:.E - 9 ,,O,|TIS * LESS THAN...Mobility Equipmnent 287 97.14 427 Scientific /Technical Intelligence 292 5.6 4128 Air Force Technical Application Center* 295 15.8 � Photo Processing...Line Item: 292 Nomenclature: Scientific /Technical Lnteliigerce Mission/Description: Thic program provide. data reduction, photo processing. and printing

  12. 48 CFR 217.172 - Multiyear contracts for supplies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of units to be procured through the contract; and (2) In the case of a contract for procurement of aircraft, the budget request includes full funding of procurement funds for production beyond advance procurement activities of aircraft units to be produced in the fiscal year covered by the budget. (d)(1) The...

  13. Historical Inflation Program. A Computer Program Generating Historical Inflation Indices for Army Aircraft. Revision.

    DTIC Science & Technology

    1984-01-01

    data comes in three published formats: (1) a cumulative history coverina past years on a monthly basis, 5 (2) yearly supplements (such as wage and...all fisca. ea’r :. ma. Outzu: _ dNx’resse as monthly, quarterly, fiscal vear, and .-r ear 4n- :~n.e (in calen- dar year 1967 base) and inflation faCt...These indices and factors provide a means of adjusting historical cost data for the procurement of Army aircraft to constant year dollars. Additional

  14. Preliminary design study of advanced composite blade and hub and nonmechanical control system for the tilt-rotor aircraft. Volume 2: Project planning data

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Project planning data for a rotor and control system procurement and testing program for modifications to the XV-15 tilt-rotor research demonstrator aircraft is presented. The design, fabrication, and installation of advanced composite blades compatible with the existing hub, an advanced composite hub, and a nonmechanical control system are required.

  15. Applications of advanced electric/electronic technology to conventional aircraft

    NASA Technical Reports Server (NTRS)

    Heimbold, R. L.

    1980-01-01

    The desirability of seven advanced technologies as applied to three commercial aircraft of 1985 to 1995 was investigated. Digital fly by wire, multiplexing, ring laser gyro, integrated avionics, all electric airplane, electric load management, and fiber optics were considered for 500 passenger, 50 passenger, and 30 passenger aircraft. The major figure of merit used was Net Value of Technology based on procurement and operating cost over the life of the aircraft. An existing computer program, ASSET, was used to resize the aircraft and evalute fuel usage and maintenance costs for each candidate configuration. Conclusions were that, for the 500 passenger aircraft, all candidates had a worthwhile payoff with the all electric airplane having a large payoff.

  16. Counterinsurgency Aircraft Procurement Options: Processes, Methods, Alternatives, and Estimates

    DTIC Science & Technology

    2009-08-01

    4. TITLE AND SUBTITLE Counterinsurgency Aircraft Procurement Options: Processes, Methods, Alternatives, and Estimates 5a. CONTRACT NUMBER 5b...Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT A call is being made for an aircraft dedicated to the...counterinsurgency (COIN) mission within military academic circles and the special operations community. Support for a COIN aircraft needs hard numbers, given

  17. Coast guard : as deepwater systems integrator, coast guard Is reassessing costs and capabilities but lags in applying its disciplined acquisition approach.

    DOT National Transportation Integrated Search

    2009-07-01

    The Deepwater Program includes efforts to build or modernize ships and aircraft and to procure other capabilities. In 2002, the Coast Guard contracted with Integrated Coast Guard Systems (ICGS) to manage the acquisition as systems integrator. After a...

  18. Price vs. Performance: The Value of Next Generation Fighter Aircraft

    DTIC Science & Technology

    2007-03-01

    forms. Both the semi-log and log-log forms were plagued with heteroskedasticity (according to the Breusch - Pagan /Cook-Weisberg test ). The RDT&E models...from 1949-present were used to construct two models – one based on procurement costs and one based on research, design, test , and evaluation (RDT&E...fighter aircraft hedonic models include several different categories of variables. Aircraft procurement costs and research, design, test , and

  19. Aircraft modifications: Assessing the current state of Air Force aircraft modifications and the implications for future military capability

    NASA Astrophysics Data System (ADS)

    Hill, Owen Jacob

    How prepared is the U.S. Air Force to modify its aircraft fleet in upcoming years? Aircraft modernization is a complex interaction of new and legacy aircraft, organizational structure, and planning policy. This research will take one component of modernization: aircraft modification, and apply a new method of analysis in order to help formulate policy to promote modernization. Departing from previous small-sample studies dependent upon weight as a chief explanatory variable, this dissertation incorporates a comprehensive dataset that was constructed for this research of all aircraft modifications from 1996 through 2005. With over 700 modification programs, this dataset is used to examine changes to the current modification policy using policy-response regression models. These changes include separating a codependent procurement and installation schedule, reducing the documentation requirements for safety modifications, and budgeting for aging aircraft modifications. The research then concludes with predictive models for the F-15 and F-16 along with their replacements: the F-22 and F-35 Joint Strike Fighter.

  20. P-8A Poseidon Multi Mission Maritime Aircraft (P-8A)

    DTIC Science & Technology

    2015-12-01

    focus also includes procurement of depot and intermediate level maintenance capabilities, full scale fatigue testing, and continued integration and... Level Confidence Level of cost estimate for current APB: 50% The current APB cost estimate provided sufficient resources to execute the program under...normal conditions, encountering average levels of technical, schedule, and programmatic risk and external interference. It was consistent with

  1. Streamlining Software Aspects of Certification: Technical Team Report on the First Industry Workshop

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J.; Holloway, C. Michael; Knight, John C.; Leveson, Nancy G.; Yang, Jeffrey C.; Dorsey, Cheryl A.; McCormick, G. Frank

    1998-01-01

    To address concerns about time and expense associated with software aspects of certification, the Federal Aviation Administration (FAA) began the Streamlining Software Aspects of Certification (SSAC) program. As part of this program, a Technical Team was established to determine whether the cost and time associated with certifying aircraft can be reduced while maintaining or improving safety, with the intent of impacting the FAA's Flight 2000 program. The Technical Team conducted a workshop to gain a better understanding of the major concerns in industry about software cost and schedule. Over 120 people attended the workshop, including representatives from the FAA,commercial transport and general aviation aircraft manufacturers and suppliers, and procurers and developers of non-airborne systems; and, more than 200 issues about software aspects of certification were recorded. This paper provides an overview of the SSAC program, motivation for the workshop, details of the workshop activities and outcomes, and recommendations for follow-on work.

  2. Flight testing the Digital Electronic Engine Control (DEEC) A unique management experience

    NASA Technical Reports Server (NTRS)

    Putnam, T. W.; Burcham, F. W., Jr.; Kock, B. M.

    1983-01-01

    The concept for the DEEC had its origin in the early 1970s. At that time it was recognized that the F100 engine performance, operability, reliability, and cost could be substantially improved by replacing the original mechanical/supervisory electronic control system with a full-authority digital control system. By 1978, the engine manufacturer had designed and initiated the procurement of flight-qualified control system hardware. As a precursor to an integrated controls program, a flight evaluation of the DEEC system on the F-15 aircraft was proposed. Questions regarding the management of the DEEC flight evaluation program are discussed along with the program elements, the technical results of the F-15 evaluation, and the impact of the flight evaluation on after-burning turbofan controls technology and its use in and application to military aircraft. The lessons learned through the conduct of the program are discussed.

  3. Final Environmental Assessment of the Joint Air-to-Surface Stand-Off Missile (JASSM) Development and Evaluation Testing, White Sands Missile Range, New Mexico

    DTIC Science & Technology

    2001-12-01

    Explosive Test Site Program Definition and Risk Reduction Permissible Exposure Limit Program Executive Office Propellants, Explosives, and...each test vehicle is flown in the captive mode and critical systems are functioned to further remove risk of failure due to the flight environment...of other inferior missiles would require a larger number of missiles, at increased procurement costs and risk to aircraft and crew, in order to

  4. Comparison of Military and Commercial Design-to-Cost Aircraft Procurement and Operational Support Practices

    DTIC Science & Technology

    1975-07-01

    the product , including its operational and maintenance requirements . However, there are many other program elements that are equally critical, i.e...customer needs into meaningful, practical requirements which can be met by the designer, verified in the product and used effectively by the operator. The...and government) and H- Production Verification Testing Requirements , spread over longer delivery periods, causing problems of shop load, high cash

  5. Specialty Metals: DOD Dissemination of National Security Waiver Information Could Enhance Awareness and Compliance with Restrictions

    DTIC Science & Technology

    2014-10-01

    the following elements: aluminum, chromium , cobalt, columbium, molybdenum, nickel , titanium, tungsten, or vanadium. Specialty metals were added... stainless steel , and some engine parts metals. Table 2 summarizes the six prime contractors’ planning activities for procuring specialty metals and the...periodic briefings. Titanium is forecast for the entire program schedule; five year forecasts are provided by aircraft. Stainless steel usage is not

  6. Optimization models for flight test scheduling

    NASA Astrophysics Data System (ADS)

    Holian, Derreck

    As threats around the world increase with nations developing new generations of warfare technology, the Unites States is keen on maintaining its position on top of the defense technology curve. This in return indicates that the U.S. military/government must research, develop, procure, and sustain new systems in the defense sector to safeguard this position. Currently, the Lockheed Martin F-35 Joint Strike Fighter (JSF) Lightning II is being developed, tested, and deployed to the U.S. military at Low Rate Initial Production (LRIP). The simultaneous act of testing and deployment is due to the contracted procurement process intended to provide a rapid Initial Operating Capability (IOC) release of the 5th Generation fighter. For this reason, many factors go into the determination of what is to be tested, in what order, and at which time due to the military requirements. A certain system or envelope of the aircraft must be assessed prior to releasing that capability into service. The objective of this praxis is to aide in the determination of what testing can be achieved on an aircraft at a point in time. Furthermore, it will define the optimum allocation of test points to aircraft and determine a prioritization of restrictions to be mitigated so that the test program can be best supported. The system described in this praxis has been deployed across the F-35 test program and testing sites. It has discovered hundreds of available test points for an aircraft to fly when it was thought none existed thus preventing an aircraft from being grounded. Additionally, it has saved hundreds of labor hours and greatly reduced the occurrence of test point reflight. Due to the proprietary nature of the JSF program, details regarding the actual test points, test plans, and all other program specific information have not been presented. Generic, representative data is used for example and proof-of-concept purposes. Apart from the data correlation algorithms, the optimization associated with restriction removal is based on heuristic approaches to support the reality of flight test in both solution space and computational time. Exact methods for yielding an optimized solution will be discussed however they are not directly applicable to the flight test problem and therefore have not been included in the system.

  7. Department of the Navy Justification of Estimates for Fiscal Year 1984 Submitted to Congress January 1983. Procurement. Aircraft Procurement, Navy

    DTIC Science & Technology

    1983-01-01

    is anti-submarine warfare ’(ASW): o de -ct, classify, track, localize, and destroy conventional and high performance .3ubmarines; to conauct long...powered personnel/cargo transport type aircraft, capable of all weather carrier operatluns. The internal payload configuration is variable, allowing...several modifications to the VH-3D (Executive transport ) he]icopters. Foremost among them is the Main Gear Box Improvements ($11.8 million in FY 1984

  8. Department of the Navy Justification of Estimates for Fiscal Year 1983 Submitted to Congress February 1982. Procurement, Book 1. Aircraft Procurement, Navy; Weapons Procurement, Navy

    DTIC Science & Technology

    1982-02-01

    m• OSI ? 1-78 ?roje-t Financial rlan: FY 1971 FY 19S0 FY 1981 18 2ý cost 2ty Cost 9r- Coat aty- cost * APN-5 CO0 $4~,200 16 $1,748 ýf I $2,T30 41...nd No.: Improvement of Fuel Q .antity Gaging System ( OSI " ,)-𔃼) Models o: Airc.-aft Affeted: A-7C/E and TA-7C leseriptlon/Justification: A The 3M...t 1-159 .TV N 7 •ODIFICATION OF AIRCRAFT FISCAL YEAR 1983 Appropriation: APN - Activity 5 Modification Title and K.. : A-?E FLIR ( OSI • 23-•9) Models

  9. 14 CFR Section 03 - Definitions for Purposes of This System of Accounts and Reports

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., aircraft miles flown are determined by multiplying the normal crusing speed for the aircraft type by the... property or consolidated shipments of property for transportation upon the aircraft of an air carrier subject to this part, or (2) procures or arranges for air transportation of property upon aircraft of an...

  10. 14 CFR Section 03 - Definitions for Purposes of This System of Accounts and Reports

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., aircraft miles flown are determined by multiplying the normal crusing speed for the aircraft type by the... property or consolidated shipments of property for transportation upon the aircraft of an air carrier subject to this part, or (2) procures or arranges for air transportation of property upon aircraft of an...

  11. 14 CFR Section 03 - Definitions for Purposes of This System of Accounts and Reports

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., aircraft miles flown are determined by multiplying the normal crusing speed for the aircraft type by the... property or consolidated shipments of property for transportation upon the aircraft of an air carrier subject to this part, or (2) procures or arranges for air transportation of property upon aircraft of an...

  12. Tactical Aircraft Modernization: Issues for Congress

    DTIC Science & Technology

    2007-06-08

    Investigations into the V-22 program, its crashes, and allegations of malfeasance came to a head in the spring of 2001. On May 1, 2001, a Blue...procurement of all weapons through FY2003 and would rise to 16% through FY2009 and 18% through FY2015. Representative Curt Weldon stated that since...the FY2000 defense budget. In the spring of 2003 F-22 affordability was again at issue. During an April 11 hearing of the House Government Reform

  13. Use of Commercial ’Off-the-Shelf’ Equipment in Military Aircraft

    DTIC Science & Technology

    1976-05-01

    never been intended as a procurement document. The airline industry benefits from the standarization of equipment. Aeronautical Radio Inc. (ARINC) is...are not intended for nor are they suitable for use as procurement specifications. 2. Airframe manufacturers and commercial airlines purchase avionics...may be suitable for military procurements but a careful review must be made to ensure that the performance and environmental testing specified is

  14. USAF shale oil program status

    NASA Technical Reports Server (NTRS)

    Delaney, C. L.

    1984-01-01

    The test and evaluation program on shale derived fuel being conducted by the Air Force is intended to accomplish the minimum amount of testing necessary to assure both the safe use of shale oil derived turbine fuels in operational USAF aircraft and its compatibility with USAF handling systems. This program, which was designed to take advantage of existing R&D testing programs, began in 1981. However, due to a problem in acquiring the necessary fuel, the testing program was suspended until July 1983 when an additional sample of shale derived fuel was received. Tentatively, the Air Force is planning to make three relatively minor revisions to the procurement specifications requirements for the production shale derived fuel. These are: (1) Aromatic Contest (min) - 9% (by volume); (2) Nitrogen (max - 20 ppm by weight); and (3) Antioxidants - 9.1 g/100 gal (U.S.)

  15. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  16. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  17. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  18. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  19. 14 CFR § 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NASA procurement program. § 1201.400... ORGANIZATION AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  20. Acquisition-Management Program

    NASA Technical Reports Server (NTRS)

    Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.

    1987-01-01

    NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.

  1. Don't Look Now - Tiltrotors Are Coming!

    NASA Technical Reports Server (NTRS)

    Dugan, Daniel C.; Hindson, William S. (Technical Monitor)

    1997-01-01

    This paper traces the history of tiltrotors, beginning with the XV-3 and XV-15, to the Marine's V-22 Osprey. The design of the first civil tiltrotor, the Bell-Boeing 609, is now complete and the revolutionary aircraft will debut in 2001 after completion of a rigorous test program. The XV-3 proved the safety and ease of transition from the helicopter mode to the airplane mode; however, it had aeroelastic stability and performance problems. The XV-15 was the tiltrotor of the late 70s and the 80s. In 1981, it was demonstrated to the international aviation community at the Paris Air Show. Its success led to the development of the V-22 Osprey and it returned to Paris in 1995 in the livery of a civil tiltrotor. There, it flew joint demonstrations with the Osprey. One is still flying today as a Civil Tiltrotor (CTR) demonstrator. The V-22 first flew in Mar 1989. After a stormy procurement cycle, the Full Scale Development (FSD) aircraft were superseded by the improved Engineering and Manufacturing Development (EMD) aircraft. The #7 Osprey made its first flight eight years later. Many highlights of the FSD and EMD flight test programs will be covered and illustrated with video clips. The Bell-Boeing 609 design was unveiled at the Smithsonian in November, 1996 and the first orders have been taken for this 250 knot, corporate size tiltrotor. Flight testing of this innovative aircraft will commence in 1999.

  2. Aircraft

    DTIC Science & Technology

    2002-01-01

    electronics, systems integration and information technology company.39 Northrop Grumman no longer seeks a position as a prime contractor/integrator of fixed...of the spares procurement and distribution processes. Finally, they recognize that excellence in Information Technology (IT) is a strategic advantage...business in export dollars, the industry has been forced to look for new markets as worldwide aircraft sales have dropped. Because the U.S. national

  3. Application of a cost/performance measurement system on a research aircraft project

    NASA Technical Reports Server (NTRS)

    Diehl, J. J.

    1978-01-01

    The fundamentals of the cost/performance management system used in the procurement of two tilt rotor aircraft for a joint NASA/Army research project are discussed. The contractor's reporting system and the GPO's analyses are examined. The use of this type of reporting system is assessed. Recommendations concerning the use of like systems on future projects are included.

  4. Quantifying the benefits of the Florida Transit Research Inspection Procurement Services (TRIPS) program : [research summary].

    DOT National Transportation Integrated Search

    2013-04-01

    Established in 1995 as the Florida Vehicle : Procurement Program (FVPP), Florida Transit : Research Inspection Procurement Services (TRIPS) : is a vehicle sourcing and procurement system for : Floridas public transit agencies that integrates : ins...

  5. 41 CFR 101-26.501-2 - Standardized buying programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.501-2 Standardized buying programs. Wherever... school age passenger. (4) Sedans and station wagons (based on standardized, consolidated requirements...

  6. 41 CFR 101-26.505-3 - Requests to procure similar items from sources other than GSA supply sources.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requests to procure... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26...

  7. DEVELOPMENT OF IMPROVED FABRICATION METHODS, PROCESS AND TECHNIQUES FOR PRODUCING TYPICAL AIRCRAFT SHAPES FROM BERYLLIUM. Interim Technical Documentary Progress Report for the Period ending October 31, 1962

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jenkins, R.G.; Siergiej, J.M.

    1962-12-28

    In a program to develop a complete manufacturing process for ihe production of beryllium channels, techniques are being sought for drawing to obtain a flnal product meeting specifications more rigorous than are obtainable by direct extrusion. Progress in designing and procuring the special tooling required to draw complex shapes at elevated temperature is described, and the flrst set of draw dies is evaluated with respect to design and quality. Three experimental draw attempts have been made on U-channels, in addition to draw tests on flats. (auth)

  8. Department of the Army Justification of Estimates for Fiscal Year 1985 Submitted to Congress February 1984, Procurement, Programs, Aircraft, Missiles, Weapons & Tracked Combat Vehicles. Part 4. Ammunition.

    DTIC Science & Technology

    1984-02-01

    Bushmaster 5860108 - Volunteer AN - Intermolecular - Ethylenediamine 5.7 dinitrate/ amonium nitrate (M) 5860122 - X-Facility: I1W - Mine MM139 Volcano...1 40 13 0001 AdJullan te prior yew truat fund or d e -3,41 17.0001 Mece feeia of prior y Otlgtte -l -56,606 Unoba Igeted balane evatIlell. MY 21...transfarred 10.000 10,000 IobiIgst d balance allloe. MO 𔃾.40M2 For completles of prior year budgt plane *1 In 39.0001 Itdgot authrlIty 4-6 Fe’ tory

  9. Procurement Career Management Handbook.

    ERIC Educational Resources Information Center

    Department of the Treasury, Washington, DC.

    This handbook is the result of the Treasury Department's efforts to increase professionalism among its procurement employees nationwide through its Procurement Career Management Program. First, the scope and objectives of the Procurement Career Management Program are discussed. The remaining sections of the handbook deal with the following program…

  10. 76 FR 53113 - Guidelines for Designating Biobased Products for Federal Procurement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    .... Information regarding the Federal biobased preferred procurement program (one part of the BioPreferred Program... Request: Extension of a currently approved information collection. Abstract: The USDA BioPreferred Program... that then permit USDA to designate items for preferred procurement under the BioPreferred Program. Once...

  11. 76 FR 60809 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... Agriculture, Agricultural Marketing Service, Washington, DC. Services Service Type/Locations: Grounds... Activity: Department of Agriculture, Agricultural Marketing Service, Washington, DC. Coverage: C-List for... Atmospheric Administration, Norfolk, VA. Service Type/Location: Transient Aircraft Services. Moody AFB, GA...

  12. NRC assessment of improvements in licensee procurement and dedication programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grimes, B.K.; Potapovs, U.; Campbell, L.L.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) recently conducted a series of on-site assessments at selected nuclear plants to review improvements that the licenses had made to their procurement and dedication activities. The assessments included an evaluation of the progress made by licensees to strengthen their commercial-grade dedication programs to comply with 10CRF50, Appendix B, and to implement the comprehensive procurement improvements suggested in Nuclear Management and Resource Council (NUMARC) publication 901-3. This paper discusses the overall purpose of the assessments, procurement areas assessed, major strengths and weaknesses identified in licensee procurement programs, and the NRC's perspective of the industry's responsemore » to NUMARC procurement initiatives.« less

  13. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  14. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  15. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  16. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  17. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  18. A Comparative Study of the Perceived Usefulness of Civilian Institution Contracting-Related Graduate Programs by Graduates and the Perceived Usefulness of the AFIT CAM (Air Force Institute of Technology Contracting and Manufacturing) Program by Graduates

    DTIC Science & Technology

    1985-09-01

    courses for a concentration in procurement and materials management: Procurement and Materials Management Procurement Contract Law Systems Procurement...for contracting in the public sector (Procurement Contract Law ). The respondents did not agree as much with this question as they did with the...the results of this section proved quite different from the group as a whole. Contract Law , Contract Negotiations, Pricing, Procurement Management

  19. Department of the Air Force Justification of Estimates for Fiscal Year 1981, Submitted to Congress January 1980, Aircraft Procurement, Air Force, Missile Procurement, Air Force, Other Procurement, Air Force.

    DTIC Science & Technology

    1980-01-01

    10-0 6 EL4 -022 8L LLý 0 0 a 0 CLcc - 3 E CL 0 ;i *1 XO go10 ,* . , -8 rt -C CL.* L. OLc L ’i go 0 0 0 L +1%- 00 00I :) I.- I - - 51 .0 Cc a,,0 c0...of Test Cells M34 and M35. The bldg will be a prefabri- cated steel structure with several work stations. The work stations will have hoist systems...mate/demate the engine to its mount. The work stations will incorporate cell type interfaces for a limited checkout of engine in- strumentation. These

  20. Department of the Army Justification of Estimates for Fiscal Year 1984 Submitted to Congress January 1983. Procurement Programs, Aircraft, Missiles, Weapons & Tracked Combat Vehicles, Ammunition and Other National Guard Equipment. Part 3.

    DTIC Science & Technology

    1983-01-01

    Massachusetts Avenue ASA(RDI&A) (21672) 1 APA only Washington, DC 20314 ASA(M&RA) (21594) 1 DANA-WSN (3B455) 6 SALL (2C638) 24 MIPA only Comander 2 DACA ...BUL (3A652) 14 DAA-WSW (3D455) 7 US Army Material & Readiness DACA -BUF (33663) 10 PWTCV only Comand DACA -ZIA (23664) 1 DANA-CS (31432) 2 ATTN: DRCSM...mount for Obtigntiost Idwaitflaoan Gada Its2I-20.01 06 procwaaont actions prormodi -- ............ ---- 119112 actual 120 oat. 2664 at. 2061 actual 12663

  1. Changing Aircraft Carrier Procurement Schedules: Effects that a Five-Year Procurement Cycle would have on Cost, Availability, and Shipyard Manpower and Workload

    DTIC Science & Technology

    2011-01-01

    Staff, the Unified Combatant Commands, the Navy, the Marine Corps, the defense agencies, and the defense Intelligence Community under Contract W74V8H...Unified Combatant Commands, the Navy, the Marine Corps, the defense agencies, and the defense Intel- ligence Community . For more information on the...the Cuban missile crisis of October 1962. The newest active air- craft carrier, the Nimitz-class USS George H. W. Bush (CVN 77), was 1 CVN is an

  2. 7 CFR 220.16 - Procurement standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM § 220.16 Procurement standards. (a) General... and Budget Circulars, concerning the procurement of all goods and services with nonprofit school food...

  3. 7 CFR 220.16 - Procurement standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM § 220.16 Procurement standards. (a) General... and Budget Circulars, concerning the procurement of all goods and services with nonprofit school food...

  4. 7 CFR 220.16 - Procurement standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM § 220.16 Procurement standards. (a) General... and Budget Circulars, concerning the procurement of all goods and services with nonprofit school food...

  5. 7 CFR 220.16 - Procurement standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM § 220.16 Procurement standards. (a) General... and Budget Circulars, concerning the procurement of all goods and services with nonprofit school food...

  6. 40 CFR 247.6 - Affirmative procurement programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Affirmative procurement programs. 247.6 Section 247.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS General § 247.6 Affirmative...

  7. Study to develop improved fire resistant aircraft passenger seat materials, phase 1

    NASA Technical Reports Server (NTRS)

    Trabold, E. L.

    1977-01-01

    The procurement and testing of a wide range of candidate materials is reported. Improved fire resistant nonmetallic materials were subjected to tests to evaluate their thermal characteristics, such as burn, smoke generation, heat release rate and toxicity. In addition, candidate materials were evaluated for mechanical, physical and aesthetic properties. Other properties considered included safety, comfort, durability and maintainability. The fiscal year 1977 and the projected 1980 cost data were obtained for aircraft seat materials.

  8. Annual Report Number 3, 1986.

    DTIC Science & Technology

    1986-01-01

    REPORT 1986 as DISTPJUtIoN STATE’Tr A Agpprovod for public reI~laeC D is riL u ti o ’ Uni e L h i DIRECTORATE SJUN 109 OF D MANAGEMENT SCIENCES AFLC/XRS...21 2. Incorporate Aircraft Availability Into D041 . 22 3. Weapon System Phase In/Out And The Aircraft Availability Procurement Model (AAPM...Capabilities .. ......... 43 2. Evaluation Of CONUS Cargo Movement Requirements ........ ................. 4 3. Material Management Manpower Standars . 4.....44 V

  9. Prevalence and correlates of hospital-based autologous blood programs: a statewide survey.

    PubMed

    Hull, A L; Neuhauser, D V; Goodnough, L T

    1992-05-01

    To identify potential barriers to use of autologous blood procurement to minimize homologous blood transfusion needs during elective surgery, the authors conducted a telephone survey of 120 blood bank directors, representing 138 Ohio hospitals. The prevalence of autologous blood procurement facilities, estimated volume of autologous blood, and attitudes and perceptions of the directors toward autologous blood predeposit programs were assessed. Analysis of the data indicated that 30% of Ohio hospitals have autologous blood procurement facilities; larger hospitals were more likely to have this facility. Overall, 5.5% of transfusions involve predeposited autologous blood. No significant differences were found according to hospital bed size or whether the hospital had a procurement facility. Blood bank directors perceived surgeons to be knowledgeable about autologous predeposit; patient demand and surgical practice were felt to be more effective in promoting the use of autologous blood at the hospital than were blood bank efforts. Directors who had autologous predeposit procurement facilities perceived that the facility provided a marketing advantage. Respondents from larger hospitals were more likely to perceive that these programs could be financially self-sufficient. The authors conclude that an economic cost-benefit analysis of hospital-based autologous blood procurement programs is important. Positive findings may influence transfusion services to adopt autologous blood procurement programs, whereas negative findings may convince hospitals that community blood donor facilities can provide better autologous blood procurement.

  10. 48 CFR 309.404 - List of parties excluded from Federal procurement and non-procurement programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-procurement programs. (c) The ASFR/OGAPA/DA shall perform the actions required by FAR 9.404(c). (4) The ASFR/OGAPA/DA shall maintain all documentation the initiating official submits to recommend the debarment or...

  11. 7 CFR 215.14a - Procurement standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.14a Procurement standards. (a... Management and Budget Circulars, concerning the procurement of all goods and services with nonprofit school...

  12. 7 CFR 215.14a - Procurement standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.14a Procurement standards. (a... Management and Budget Circulars, concerning the procurement of all goods and services with nonprofit school...

  13. 7 CFR 215.14a - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.14a Procurement standards. (a... Management and Budget Circulars, concerning the procurement of all goods and services with nonprofit school...

  14. 7 CFR 215.14a - Procurement standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.14a Procurement standards. (a... Management and Budget Circulars, concerning the procurement of all goods and services with nonprofit school...

  15. 7 CFR 215.14a - Procurement standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.14a Procurement standards. (a... Management and Budget Circulars, concerning the procurement of all goods and services with nonprofit school...

  16. Recommendations of the Commission on Government Procurement: A Final Assessment

    DTIC Science & Technology

    1979-05-31

    Assessment TECHNICAi; LIBRARY Important structural changes are now in place on procurement reforms first proposed in 1972, but the program is far...COMPTROLLER GENERAL’S REPORT TO THE CONGRESS RECOMMENDATIONS OF THE COMMISSION ON GOVERNMENT PROCUREMENT: A FINAL ASSESSMENT DIGEST As Federal...legislation and —the Office of Federal Procurement Policy (OFPP) to lead in making needed changes. OVERALL ASSESSMENT Success of the reform program is still

  17. Logistics Aloft

    DTIC Science & Technology

    2011-02-17

    inefficient. While the initial purchase cost of the CH-47 and UH-60 can be significantly less than the C-130J or C-27J (the C-27J is in procurement...to replace the C-23), the operating costs of the UH-60 is approximately equal to a small fixed wing aircraft such as the C-23, C-130J, or C-27J...Furthermore, CH-47 operating costs are four to five times that of these fixed wing aircraft.19 In fact, when comparing the increased lift capacity

  18. Transformation of the People’s Army of Vietnam, 1954-1975

    DTIC Science & Technology

    2016-05-26

    career. My family, both at home and the Army, are the reason I come to work. vi Acronyms AAA Anti-Aircraft Artillery ARVN Army of the...transformation in response to the United States war effort was the modernization of their Anti-Aircraft Artillery ( AAA ). On 2 March 1965, the United States...the AAA into a capable force, the north sought external support. The DRV turned to the USSR to procure equipment to combat the air threat from the

  19. 32 CFR 516.60 - Procurement fraud and irregularities programs at MACOMs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Procurement fraud and irregularities programs at MACOMs. 516.60 Section 516.60 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES AND PUBLIC RELATIONS LITIGATION Remedies in Procurement Fraud and Corruption...

  20. 76 FR 27274 - Defense Federal Acquisition Regulation Supplement; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... procurement programs, it must provide written notice of the determination to the GSA Suspension and Debarment Official. List of Subjects in 48 CFR Part 209 Government procurement. Ynette R. Shelkin, Editor, Defense... suspended from procurement programs, it must provide written notice of the determination to the General...

  1. 32 CFR 516.60 - Procurement fraud and irregularities programs at MACOMs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 3 2011-07-01 2009-07-01 true Procurement fraud and irregularities programs at MACOMs. 516.60 Section 516.60 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES AND PUBLIC RELATIONS LITIGATION Remedies in Procurement Fraud and Corruption...

  2. Energy-efficient Public Procurement: Best Practice in Program Delivery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Payne, Christopher; Weber, Andrew; Semple, Abby

    2013-02-15

    This document illustrates the key issues and considerations involved in implementing energy-efficient public procurement. Our primary sources of information have been our partners in the Super Efficient Equipment and Appliance Deployment (SEAD) Initiative Procurement Working Group. Where applicable, we have highlighted specific ways in which working group participants have successfully overcome barriers to delivering effective programs. The following key points emerge from this analysis of programs for energy-efficient public procurement. Lessons for both developed and developing programs are highlighted throughout the guide. 1. Policy: Policy provides the initiative to begin a transition from first cost to life-cycle cost based purchasingmore » methods and culture. Effective policy is well-communicated, establishes accountability from top to bottom of organizations and simplifies the processes necessary to comply. Flexibility and responsiveness are essential in policy development and implementation. Mandatory and voluntary policies may complement one another. 2. Procurement Criteria: Procurement staff must be confident that energy-efficient procurement criteria offer the best long-term value for their organization’s money and represent real environmental gains. Involving multiple stakeholders at the early stages of the criteria creation process can result in greater levels of cooperation from private industry. Criteria should make comparison of products easy for purchasers and require minimal additional calculations. Criteria will need to be regularly updated to reflect market developments. 3. Training: Resources for the creation of training programs are usually very limited, but well-targeted training is necessary in order for a program to be effective. Training must emphasize a process that is efficient for purchasers and simplifies compliance. Purchaser resources and policy must be well designed for training to be effective. Training program development is an excellent opportunity for collaboration amongst public authorities. 4. Procurement Processes: Many tools and guides intended to help buyers comply with energy-efficient procurement policy are designed without detailed knowledge of the procurement process. A deeper understanding of purchasing pathways allows resources to be better directed. Current research by national and international bodies aims to analyze purchasing pathways and can assist in developing future resources.« less

  3. Use of commercial grade item dedication to reduce procurement costs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosch, F.

    1995-09-01

    In the mid-1980s, the Nuclear Regulatory Industry (NRC) began inspecting utility practices of procuring and dedicating commercial grade items intended for plant safety-related applications. As a result of the industry efforts to address NRC concerns, nuclear utilities have enhanced existing programs and procedures for dedication of commercial grade items. Though these programs were originally enhanced to meet NRC concerns, utilities have discovered that the dedication of commercial grade items can also reduce overall procurement costs. This paper will discuss the enhancement of utility dedication programs and demonstrates how utilities have utilized them to reduce procurement costs.

  4. The DOE ARM Aerial Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schmid, Beat; Tomlinson, Jason M.; Hubbe, John M.

    2014-05-01

    The Department of Energy Atmospheric Radiation Measurement (ARM) Program is a climate research user facility operating stationary ground sites that provide long-term measurements of climate relevant properties, mobile ground- and ship-based facilities to conduct shorter field campaigns (6-12 months), and the ARM Aerial Facility (AAF). The airborne observations acquired by the AAF enhance the surface-based ARM measurements by providing high-resolution in-situ measurements for process understanding, retrieval-algorithm development, and model evaluation that are not possible using ground- or satellite-based techniques. Several ARM aerial efforts were consolidated into the AAF in 2006. With the exception of a small aircraft used for routinemore » measurements of aerosols and carbon cycle gases, AAF at the time had no dedicated aircraft and only a small number of instruments at its disposal. In this "virtual hangar" mode, AAF successfully carried out several missions contracting with organizations and investigators who provided their research aircraft and instrumentation. In 2009, AAF started managing operations of the Battelle-owned Gulfstream I (G-1) large twin-turboprop research aircraft. Furthermore, the American Recovery and Reinvestment Act of 2009 provided funding for the procurement of over twenty new instruments to be used aboard the G-1 and other AAF virtual-hangar aircraft. AAF now executes missions in the virtual- and real-hangar mode producing freely available datasets for studying aerosol, cloud, and radiative processes in the atmosphere. AAF is also engaged in the maturation and testing of newly developed airborne sensors to help foster the next generation of airborne instruments.« less

  5. 76 FR 67370 - Federal Property Management Regulation (FPMR); Procurement Sources and Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... to agency management and personnel. List of Subjects in 41 CFR Part 101-26 Procurement sources and... MANAGEMENT REGULATIONS PART 101-26--PROCUREMENT SOURCES AND PROGRAMS 0 1. The authority for 41 CFR part 101...; Docket Number 2011-017; Sequence 1] RIN 3090-AJ19 Federal Property Management Regulation (FPMR...

  6. 41 CFR 101-26.507-4 - Quantities in excess of the maximum order limitation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Quantities in excess of... Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.507-4 Quantities in...

  7. 41 CFR 101-26.508-1 - Requisitioning data processing tape available through Federal Supply Schedule contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requisitioning data... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26...

  8. 48 CFR 926.7003 - Review of the procurement request.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7003 Review of the procurement request. Any Energy Policy Act procurement, including basic... potential for making Energy Policy Act awards. [60 FR 22300, May 5, 1995, as amended at 61 FR 21977, May 13...

  9. 48 CFR 926.7003 - Review of the procurement request.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7003 Review of the procurement request. Any Energy Policy Act procurement, including basic... potential for making Energy Policy Act awards. [60 FR 22300, May 5, 1995, as amended at 61 FR 21977, May 13...

  10. 48 CFR 926.7003 - Review of the procurement request.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7003 Review of the procurement request. Any Energy Policy Act procurement, including basic... potential for making Energy Policy Act awards. [60 FR 22300, May 5, 1995, as amended at 61 FR 21977, May 13...

  11. 48 CFR 926.7003 - Review of the procurement request.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7003 Review of the procurement request. Any Energy Policy Act procurement, including basic... potential for making Energy Policy Act awards. [60 FR 22300, May 5, 1995, as amended at 61 FR 21977, May 13...

  12. 48 CFR 926.7003 - Review of the procurement request.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7003 Review of the procurement request. Any Energy Policy Act procurement, including basic... potential for making Energy Policy Act awards. [60 FR 22300, May 5, 1995, as amended at 61 FR 21977, May 13...

  13. V/STOL tilt rotor aircraft study. Volume 2: Preliminary design of research aircraft

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A preliminary design study was conducted to establish a minimum sized, low cost V/STOL tilt-rotor research aircraft with the capability of performing proof-of-concept flight research investigations applicable to a wide range of useful military and commercial configurations. The analysis and design approach was based on state-of-the-art methods and maximum use of off-the-shelf hardware and systems to reduce development risk, procurement cost and schedules impact. The rotors to be used are of 26 foot diameter and are the same as currently under construction and test as part of NASA Tilt-Rotor Contract NAS2-6505. The aircraft has a design gross weight of 12,000 lbs. The proposed engines to be used are Lycoming T53-L-13B rated at 1550 shaft horsepower which are fully qualified. A flight test investigation is recommended which will determine the capabilities and limitations of the research aircraft.

  14. Navy DDG-1000 Destroyer Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2007-10-25

    production quantity of eight ships (one more than the Navy currently plans to procure). Shared Production Arrangement. NGSS and GD/BIW have agreed on a...X)). Navy plans call for procuring 7 DDG-1000s between FY2007 and FY2013. The first two DDG-1000s were procured in FY2007 and are being split...Congress for the DDG-1000 program include supporting the Navy’s proposed plans , using a block-buy arrangement for procuring several DDG-1000s, and

  15. Progress Toward a Format Standard for Flight Dynamics Models

    NASA Technical Reports Server (NTRS)

    Jackson, E. Bruce; Hildreth, Bruce L.

    2006-01-01

    In the beginning, there was FORTRAN, and it was... not so good. But it was universal, and all flight simulator equations of motion were coded with it. Then came ACSL, C, Ada, C++, C#, Java, FORTRAN-90, Matlab/Simulink, and a number of other programming languages. Since the halcyon punch card days of 1968, models of aircraft flight dynamics have proliferated in training devices, desktop engineering and development computers, and control design textbooks. With the rise of industry teaming and increased reliance on simulation for procurement decisions, aircraft and missile simulation models are created, updated, and exchanged with increasing frequency. However, there is no real lingua franca to facilitate the exchange of models from one simulation user to another. The current state-of-the-art is such that several staff-months if not staff-years are required to 'rehost' each release of a flight dynamics model from one simulation environment to another one. If a standard data package or exchange format were to be universally adopted, the cost and time of sharing and updating aerodynamics, control laws, mass and inertia, and other flight dynamic components of the equations of motion of an aircraft or spacecraft simulation could be drastically reduced. A 2002 paper estimated over $ 6 million in savings could be realized for one military aircraft type alone. This paper describes the efforts of the American Institute of Aeronautics and Astronautics (AIAA) to develop a standard flight dynamic model exchange standard based on XML and HDF-5 data formats.

  16. Toxic substances alert program

    NASA Technical Reports Server (NTRS)

    Junod, T. L.

    1978-01-01

    A toxicity profile is provided, of 187 toxic substances procured by NASA Lewis Research Center during a 3 1/2 year period, including 27 known or suspected carcinogens. The goal of the program is to assure that the center's health and safety personnel are aware of the procurement and use of toxic substances and to alert and inform the users of these materials as to the toxic characteristics and the control measures needed to ensure their safe use. The program also provides a continuing record of the toxic substances procured, who procured them, what other toxic substances the user has obtained in the past, and where similar materials have been used elsewhere at the center.

  17. 48 CFR 1323.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Use of Recovered Materials 1323.404 Agency affirmative procurement...

  18. 10 CFR 436.43 - Procurement planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Procurement planning. 436.43 Section 436.43 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Agency Procurement of Energy Efficient Products § 436.43 Procurement planning. (a) Agencies should consider the...

  19. 48 CFR Appendix A to Part 1219 - Appendix A to Part 1219

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Rebuilding of engines, turbines, components and weapons equipment J028/J010 (5) ADP Central Processing Units... Engines, Aircraft; and Components 2840 (10) Radar Equipment (except airborne) and Navigation and Navigational Aids (basic research) 5840/AT31 * The industry categories were derived from Federal Procurement...

  20. 48 CFR Appendix A to Part 1219 - Appendix A to Part 1219

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Rebuilding of engines, turbines, components and weapons equipment J028/J010 (5) ADP Central Processing Units... Engines, Aircraft; and Components 2840 (10) Radar Equipment (except airborne) and Navigation and Navigational Aids (basic research) 5840/AT31 * The industry categories were derived from Federal Procurement...

  1. 48 CFR Appendix A to Part 1219 - Appendix A to Part 1219

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Rebuilding of engines, turbines, components and weapons equipment J028/J010 (5) ADP Central Processing Units... Engines, Aircraft; and Components 2840 (10) Radar Equipment (except airborne) and Navigation and Navigational Aids (basic research) 5840/AT31 * The industry categories were derived from Federal Procurement...

  2. 48 CFR Appendix A to Part 1219 - Appendix A to Part 1219

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Rebuilding of engines, turbines, components and weapons equipment J028/J010 (5) ADP Central Processing Units... Engines, Aircraft; and Components 2840 (10) Radar Equipment (except airborne) and Navigation and Navigational Aids (basic research) 5840/AT31 * The industry categories were derived from Federal Procurement...

  3. 78 FR 28785 - Defense Federal Acquisition Regulation Supplement: Only One Offer-Further Implementation (DFARS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ...-- Obtaining Greater Efficiency and Productivity in Defense Spending. DFARS Case 2011-D049 was initiated to...-Owned Small Business Procurement Program, and the Women-Owned Small Business Program. The 8(a) Program... Small Business Procurement Program (see FAR 19.1405(c)), or the Women-Owned Small Business Program (see...

  4. 41 CFR 101-26.501-9 - Centralized motor vehicle leasing program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Centralized motor vehicle...-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.501-9 Centralized motor vehicle leasing program. GSA has a centralized leasing program to provide an additional source of motor vehicle support to...

  5. 48 CFR 1323.404-70 - DOC affirmative procurement program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Use of Recovered Materials 1323.404-70 DOC affirmative procurement...

  6. Integrating team resource management program into staff training improves staff's perception and patient safety in organ procurement and transplantation: the experience in a university-affiliated medical center in Taiwan.

    PubMed

    Hsu, Ya-Chi; Jerng, Jih-Shuin; Chang, Ching-Wen; Chen, Li-Chin; Hsieh, Ming-Yuan; Huang, Szu-Fen; Liu, Yueh-Ping; Hung, Kuan-Yu

    2014-08-11

    The process involved in organ procurement and transplantation is very complex that requires multidisciplinary coordination and teamwork. To prevent error during the processes, teamwork education and training might play an important role. We wished to evaluate the efficacy of implementing a Team Resource Management (TRM) program on patient safety and the behaviors of the team members involving in the process. We implemented a TRM training program for the organ procurement and transplantation team members of the National Taiwan University Hospital (NTUH), a teaching medical center in Taiwan. This 15-month intervention included TRM education and training courses for the healthcare workers, focused group skill training for the procurement and transplantation team members, video demonstration and training, and case reviews with feedbacks. Teamwork culture was evaluated and all procurement and transplantation cases were reviewed to evaluate the application of TRM skills during the actual processes. During the intervention period, a total of 34 staff members participated the program, and 67 cases of transplantations were performed. Teamwork framework concept was the most prominent dimension that showed improvement from the participants for training. The team members showed a variety of teamwork behaviors during the process of procurement and transplantation during the intervention period. Of note, there were two potential donors with a positive HIV result, for which the procurement processed was timely and successfully terminated by the team. None of the recipients was transplanted with an infected organ. No error in communication or patient identification was noted during review of the case records. Implementation of a Team Resource Management program improves the teamwork culture as well as patient safety in organ procurement and transplantation.

  7. Integrating team resource management program into staff training improves staff’s perception and patient safety in organ procurement and transplantation: the experience in a university-affiliated medical center in Taiwan

    PubMed Central

    2014-01-01

    Background The process involved in organ procurement and transplantation is very complex that requires multidisciplinary coordination and teamwork. To prevent error during the processes, teamwork education and training might play an important role. We wished to evaluate the efficacy of implementing a Team Resource Management (TRM) program on patient safety and the behaviors of the team members involving in the process. Methods We implemented a TRM training program for the organ procurement and transplantation team members of the National Taiwan University Hospital (NTUH), a teaching medical center in Taiwan. This 15-month intervention included TRM education and training courses for the healthcare workers, focused group skill training for the procurement and transplantation team members, video demonstration and training, and case reviews with feedbacks. Teamwork culture was evaluated and all procurement and transplantation cases were reviewed to evaluate the application of TRM skills during the actual processes. Results During the intervention period, a total of 34 staff members participated the program, and 67 cases of transplantations were performed. Teamwork framework concept was the most prominent dimension that showed improvement from the participants for training. The team members showed a variety of teamwork behaviors during the process of procurement and transplantation during the intervention period. Of note, there were two potential donors with a positive HIV result, for which the procurement processed was timely and successfully terminated by the team. None of the recipients was transplanted with an infected organ. No error in communication or patient identification was noted during review of the case records. Conclusion Implementation of a Team Resource Management program improves the teamwork culture as well as patient safety in organ procurement and transplantation. PMID:25115403

  8. 7 CFR 3565.257 - Procurement actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...

  9. 7 CFR 3565.257 - Procurement actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...

  10. 48 CFR 423.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Agency affirmative procurement programs. 423.404 Section 423.404 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...

  11. 48 CFR 423.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Agency affirmative procurement programs. 423.404 Section 423.404 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...

  12. 48 CFR 423.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Agency affirmative procurement programs. 423.404 Section 423.404 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...

  13. 48 CFR 423.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Agency affirmative procurement programs. 423.404 Section 423.404 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...

  14. 48 CFR 423.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Agency affirmative procurement programs. 423.404 Section 423.404 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...

  15. 48 CFR 1323.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Agency affirmative procurement programs. 1323.404 Section 1323.404 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...

  16. 48 CFR 1323.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Agency affirmative procurement programs. 1323.404 Section 1323.404 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...

  17. 48 CFR 1323.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Agency affirmative procurement programs. 1323.404 Section 1323.404 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...

  18. Quantifying the benefits of the Florida Transit Research Inspection Procurement Services (TRIPS) program.

    DOT National Transportation Integrated Search

    2013-04-01

    This study details the analysis of the Florida Transit Research Inspection Procurement Services (TRIPS) Program. It provides a comparative assessment of the program with respect to out-of-state practice, provides recommendations to improve life cycle...

  19. 41 CFR 101-26.501-3 - Consolidated purchase program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT..., purchased in the aggregate by group to the extent practical. These procurements are designed to obtain the...

  20. The new millennium program: Fast-track procurements

    NASA Astrophysics Data System (ADS)

    Metzger, Robert M.

    1996-11-01

    The National Aeronautics and Space Administration's (NASA's) New Millennium Program (NMP) has embarked on a technology flight-validation demonstration program to enable the kinds of missions that NASA envisions for the 21st century. Embedded in this program is the concept of rapid mission development supported by a fast-track procurement process. This process begins with the decision to initiate a procurement very early in the program along with the formation of a technical acquisition team. A close working relationship among the team members is essential to avoiding delays and developing a clear acquisition plan. The request for proposal (RFP) that is subsequently issued seeks a company with proven capabilities, so that the time allotted for responses from proposers and the length of proposals they submit can be shortened. The fast-track procurement process has been demonstrated during selection of NMP's industrial partners and has been proven to work.

  1. 20 CFR 627.420 - Procurement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Procurement. 627.420 Section 627.420... PROGRAMS UNDER TITLES I, II, AND III OF THE ACT Administrative Standards § 627.420 Procurement. (a) General. (1) For purposes of this section, the term procurement means the process which leads to any award of...

  2. 7 CFR 246.24 - Procurement and property management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS... lobbying restrictions as required in 7 CFR part 3018 concerning the procurement and allowability of food in...

  3. 48 CFR 1323.404-70 - DOC affirmative procurement program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false DOC affirmative procurement program. 1323.404-70 Section 1323.404-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES...

  4. 48 CFR 1323.404-70 - DOC affirmative procurement program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOC affirmative procurement program. 1323.404-70 Section 1323.404-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES...

  5. 48 CFR 1323.404-70 - DOC affirmative procurement program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false DOC affirmative procurement program. 1323.404-70 Section 1323.404-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES...

  6. 17 CFR 200.13 - Executive Director.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AND ETHICS; AND INFORMATION AND REQUESTS Organization and Program Management General Organization... procurement regulations, enters into contracts, designates contracting officers, and makes procurement...-specific application of performance measures, procurement reforms, personnel reductions, financial...

  7. Measurement Capabilities of the DOE ARM Aerial Facility

    NASA Astrophysics Data System (ADS)

    Schmid, B.; Tomlinson, J. M.; Hubbe, J.; Comstock, J. M.; Kluzek, C. D.; Chand, D.; Pekour, M. S.

    2012-12-01

    The Department of Energy Atmospheric Radiation Measurement (ARM) Program is a climate research user facility operating stationary ground sites in three important climatic regimes that provide long-term measurements of climate relevant properties. ARM also operates mobile ground- and ship-based facilities to conduct shorter field campaigns (6-12 months) to investigate understudied climate regimes around the globe. Finally, airborne observations by ARM's Aerial Facility (AAF) enhance the surface-based ARM measurements by providing high-resolution in situ measurements for process understanding, retrieval algorithm development, and model evaluation that is not possible using ground-based techniques. AAF started out in 2007 as a "virtual hangar" with no dedicated aircraft and only a small number of instruments owned by ARM. In this mode, AAF successfully carried out several missions contracting with organizations and investigators who provided their research aircraft and instrumentation. In 2009, the Battelle owned G-1 aircraft was included in the ARM facility. The G-1 is a large twin turboprop aircraft, capable of measurements up to altitudes of 7.5 km and a range of 2,800 kilometers. Furthermore the American Recovery and Reinvestment Act of 2009 provided funding for the procurement of seventeen new instruments to be used aboard the G-1 and other AAF virtual-hangar aircraft. AAF now executes missions in the virtual- and real-hangar mode producing freely available datasets for studying aerosol, cloud, and radiative processes in the atmosphere. AAF is also heavily engaged in the maturation and testing of newly developed airborne sensors to help foster the next generation of airborne instruments. In the presentation we will showcase science applications based on measurements from recent field campaigns such as CARES, CALWATER and TCAP.

  8. DOD-Wide Civilian Career Program for Procurement Personnel.

    ERIC Educational Resources Information Center

    Office of the Assistant Secretary of Defense for Manpower and Reserve Affairs (DOD), Washington, DC.

    The manual, which supersedes the August 4, 1966 manual, is designed to aid in program improvement for career development and advancement opportunities of Department of Defense (DOD) civilian procurement personnel. Program elements covered include: career patterns, career counseling and appraisal, training and development, registration, referral…

  9. Transplant Procurement Management Model Training: Marked Improvement in the Mindset of In-Hospital Procurement Coordinators at Hyogo Prefecture, Japan.

    PubMed

    Yoshikawa, M; Yoshinaga, K; Imamura, Y; Hayashi, T; Osako, T; Takahashi, K; Kaneko, M; Fujisawa, M; Kamidono, S

    2016-09-01

    The organ donation rate in Japan is much lower than that in other developed countries for several reasons. An advanced educational program for in-hospital procurement coordinators is a possible solution for this. We introduced a Transplant Procurement Management (TPM) educational program at Hyogo Prefecture, Japan. Ten healthcare professionals at Hyogo Prefecture participated in the Advanced International TPM course to educate themselves on TPM and held 2 TPM Model Organ Procurement Training Workshops at Hyogo Prefecture for in-hospital procurement coordinators. Furthermore, we held 2 workshops outside Hyogo Prefecture and at the same time undertook a pre-workshop questionnaire survey to evaluate the ability and motivation with respect to organ donation. To evaluate the effectiveness of the workshops, we conducted post-workshop and 3-months-after workshop questionnaire surveys. The results of the pre-workshop survey revealed that in-hospital procurement coordinators lacked the knowledge regarding the entire organ donation process, the current status of organ donation in Japan, and the definition of brain death. Moreover, they did not completely understand the meaning of "organ donation." The results of the post-workshop questionnaire survey showed that the educational program was effective to improve the knowledge and skills of organ donation and motivated behavioral changes among the participants. The survey results showed that our TPM model educational program offered sufficient knowledge and skills to increase organ donation at Hyogo Prefecture. We will continue this program and make an effort to further contribute to the Japanese organ donation activities. Copyright © 2016 Elsevier Inc. All rights reserved.

  10. Optimizing national immunization program supply chain management in Thailand: an economic analysis.

    PubMed

    Riewpaiboon, A; Sooksriwong, C; Chaiyakunapruk, N; Tharmaphornpilas, P; Techathawat, S; Rookkapan, K; Rasdjarmrearnsook, A; Suraratdecha, C

    2015-07-01

    This study aimed to conduct an economic analysis of the transition of the conventional vaccine supply and logistics systems to the vendor managed inventory (VMI) system in Thailand. Cost analysis of health care program. An ingredients based approach was used to design the survey and collect data for an economic analysis of the immunization supply and logistics systems covering procurement, storage and distribution of vaccines from the central level to the lowest level of vaccine administration facility. Costs were presented in 2010 US dollar. The total cost of the vaccination program including cost of vaccine procured and logistics under the conventional system was US$0.60 per packed volume procured (cm(3)) and US$1.35 per dose procured compared to US$0.66 per packed volume procured (cm(3)) and US$1.43 per dose procured under the VMI system. However, the findings revealed that the transition to the VMI system and outsourcing of the supply chain system reduced the cost of immunization program at US$6.6 million per year because of reduction of un-opened vaccine wastage. The findings demonstrated that the new supply chain system would result in efficiency improvement and potential savings to the immunization program compared to the conventional system. Copyright © 2015 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.

  11. Strategies for success among OPOs: a study of three organ procurement organizations.

    PubMed

    Shafer, T J; Kappel, D F; Heinrichs, D F

    1997-03-01

    Productivity among organ procurement organizations varies widely in the US, and the pressure to determine critical success factors increases as the organ pool shrinks and managed care expands. This study compared three successful organ procurement organizations, identified commonalities among them in cost of doing business, and examined direct and indirect expenses, staffing, specialized requestor programs, and professional and public education programs. The three organ procurement organizations were chosen because of their performance in terms of donors per million population, complexity, and size. The following key indicators were compared and analyzed: annual operating budget, size and composition of staff, funds and resources invested in professional education versus public education, tissue recovery operations, results of minority initiatives, and employee compensation programs.

  12. Cost effective nuclear commercial grade dedication

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maletz, J.J.; Marston, M.J.

    1991-01-01

    This paper describes a new computerized database method to create/edit/view specification technical data sheets (mini-specifications) for procurement of spare parts for nuclear facility maintenance and to develop information that could support possible future facility life extension efforts. This method may reduce cost when compared with current manual methods. The use of standardized technical data sheets (mini-specifications) for items of the same category improves efficiency. This method can be used for a variety of tasks, including: Nuclear safety-related procurement; Non-safety related procurement; Commercial grade item procurement/dedication; Evaluation of replacement items. This program will assist the nuclear facility in upgrading its procurementmore » activities consistent with the recent NUMARC Procurement Initiative. Proper utilization of the program will assist the user in assuring that the procured items are correct for the applications, provide data to assist in detecting fraudulent materials, minimize human error in withdrawing database information, improve data retrievability, improve traceability, and reduce long-term procurement costs.« less

  13. Two Rotor Stratified Charge Rotary Engine (SCRE) Engine System Technology Evaluation

    NASA Technical Reports Server (NTRS)

    Hoffman, T.; Mack, J.; Mount, R.

    1994-01-01

    This report summarizes results of an evaluation of technology enablement component technologies as integrated into a two rotor Stratified Charge Rotary Engine (SCRE). The work constitutes a demonstration of two rotor engine system technology, utilizing upgraded and refined component technologies derived from prior NASA Contracts NAS3-25945, NAS3-24628 and NAS-23056. Technical objectives included definition of, procurement and assembly of an advanced two rotor core aircraft engine, operation with Jet-A fuel at Take-Off rating of 340 BHP (254kW) and operation at a maximum cruise condition of 255 BHP (190kW), 75% cruise. A fuel consumption objective of 0.435 LBS/BHP-Hr (265 GRS/kW-Hr) was identified for the maximum cruise condition. A critical technology component item, a high speed, unit injector fuel injection system with electronic control was defined, procured and tested in conjunction with this effort. The two rotor engine configuration established herein defines an affordable, advanced, Jet-A fuel capability core engine (not including reduction gear, propeller shaft and some aircraft accessories) for General Aviation of the mid-1990's and beyond.

  14. Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress

    DTIC Science & Technology

    2017-03-21

    the 75th and 76th ships in the class. The 10 DDG-51s programmed for procurement in FY2013-FY2017 (in annual quantities of 3-1-2-2-2) are being...procured under the 10- ship MYP contract for FY2013-FY2017. The Navy, in its budget submission, notes this additional $1 billion in funding for the DDG...two DDG-51s requested for procurement in FY2017 at $3,393.9 million. The ships have received a total of $182.6 million in prior-year advance procurement

  15. 13 CFR 124.505 - When will SBA appeal the terms or conditions of a particular 8(a) contract or a procuring...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... conditions of a particular 8(a) contract or a procuring activity decision not to reserve a requirement for...) contract or a procuring activity decision not to reserve a requirement for the 8(a) BD program? (a) What... an 8(a) contract after SBA's acceptance of the requirement for the 8(a) BD program; and (3) The terms...

  16. Suggestions for Enhancing the Procurement Career Management Program in the United States Coast Guard.

    DTIC Science & Technology

    1987-06-01

    37 D ALTERNATIVE vlEwS ...... .............. 37 I E. PROCUREMENT INITIATIVES TO PROFESSIONALIZE THE WORKFORCE... 38 F. PROFESSIONALISM...Procurement Research The objective of this element is to identify sources for completed research, list alternatives for conducting further research, and...year depending on what new program starts occur, however the general pattern is relatively representative through FY1986. With the MLCs coming online in

  17. 13 CFR 121.401 - What procurement programs are subject to size determinations?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... program, the Women-Owned Small Business (WOSB) Federal Contract Assistance Procedures, SBA's Service... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What procurement programs are subject to size determinations? 121.401 Section 121.401 Business Credit and Assistance SMALL BUSINESS...

  18. 41 CFR 101-26.509-2 - Requisitioning tabulating machine cards not available from Federal Supply Schedule contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement... contracts will not adequately serve the end-use purpose. GSA will notify the requesting agency in writing of... in which the requisitioner is located. GSA will either arrange for procurement of the items or...

  19. Scientific, legal, and ethical challenges of end-of-life organ procurement in emergency medicine.

    PubMed

    Rady, Mohamed Y; Verheijde, Joseph L; McGregor, Joan L

    2010-09-01

    We review (1) scientific evidence questioning the validity of declaring death and procuring organs in heart-beating (i.e., neurological standard of death) and non-heart-beating (i.e., circulatory-respiratory standard of death) donation; (2) consequences of collaborative programs realigning hospital policies to maximize access of procurement coordinators to critically and terminally ill patients as potential donors on arrival in emergency departments; and (3) ethical and legal ramifications of current practices of organ procurement on patients and their families. Relevant publications in peer-reviewed journals and government websites. Scientific evidence undermines the biological criteria of death that underpin the definition of death in heart-beating (i.e., neurological standard) and non-heart-beating (i.e., circulatory-respiratory standard) donation. Philosophical reinterpretation of the neurological and circulatory-respiratory standards in the death statute, to avoid the appearance of organ procurement as an active life-ending intervention, lacks public and medical consensus. Collaborative programs bundle procurement coordinators together with hospital staff for a team-huddle and implement a quality improvement tool for a Rapid Assessment of Hospital Procurement Barriers in Donation. Procurement coordinators have access to critically ill patients during the course of medical treatment with no donation consent and with family or surrogates unaware of their roles. How these programs affect the medical care of these patients has not been studied. Policies enforcing end-of-life organ procurement can have unintended consequences: (1) erosion of care in the patient's best interests, (2) lack of transparency, and (3) ethical and legal ramifications of flawed standards of declaring death. Copyright 2010 Elsevier Ireland Ltd. All rights reserved.

  20. 48 CFR 1323.204 - Procurement exemptions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 1323.204 Procurement exemptions. The designee authorized to exempt the procurement of an ENERGY STAR or Federal Energy Management...

  1. 48 CFR 1323.204 - Procurement exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 1323.204 Procurement exemptions. The designee authorized to exempt the procurement of an ENERGY STAR or Federal Energy Management...

  2. 48 CFR 1323.204 - Procurement exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 1323.204 Procurement exemptions. The designee authorized to exempt the procurement of an ENERGY STAR or Federal Energy Management...

  3. 48 CFR 1323.204 - Procurement exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 1323.204 Procurement exemptions. The designee authorized to exempt the procurement of an ENERGY STAR or Federal Energy Management...

  4. 48 CFR 1323.204 - Procurement exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 1323.204 Procurement exemptions. The designee authorized to exempt the procurement of an ENERGY STAR or Federal Energy Management...

  5. Small Business Procurement Event

    DTIC Science & Technology

    2014-08-13

    Small Business Procurement Event 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Department of the Navy,Office of Small Business Programs,720 Kennon...distribution unlimited 13. SUPPLEMENTARY NOTES NDIA 27th Navy Gold Coast Small Business Procurement Event, 12-13 Aug 2014, San Diego, CA. 14. ABSTRACT

  6. NASA Procurement Career Development Program

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.

  7. 48 CFR 619.402 - Small Business Administration procurement center representatives.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Small Business... DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation with the Small Business Administration 619.402 Small Business Administration procurement center representatives. ...

  8. 7 CFR 210.21 - Procurement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NATIONAL SCHOOL LUNCH PROGRAM State Agency and School Food Authority... the applicable Office of Management and Budget Circulars, concerning the procurement of all goods and...

  9. 7 CFR 210.21 - Procurement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NATIONAL SCHOOL LUNCH PROGRAM State Agency and School Food Authority... the applicable Office of Management and Budget Circulars, concerning the procurement of all goods and...

  10. 7 CFR 210.21 - Procurement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NATIONAL SCHOOL LUNCH PROGRAM State Agency and School Food Authority... the applicable Office of Management and Budget Circulars, concerning the procurement of all goods and...

  11. 7 CFR 210.21 - Procurement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NATIONAL SCHOOL LUNCH PROGRAM State Agency and School Food Authority... the applicable Office of Management and Budget Circulars, concerning the procurement of all goods and...

  12. 48 CFR 619.402 - Small Business Administration procurement center representatives.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Small Business... DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation with the Small Business Administration 619.402 Small Business Administration procurement center representatives. ...

  13. 48 CFR 619.402 - Small Business Administration procurement center representatives.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Small Business... DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation with the Small Business Administration 619.402 Small Business Administration procurement center representatives. ...

  14. 48 CFR 619.402 - Small Business Administration procurement center representatives.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Small Business... DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation with the Small Business Administration 619.402 Small Business Administration procurement center representatives. ...

  15. 48 CFR 619.402 - Small Business Administration procurement center representatives.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Small Business... DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation with the Small Business Administration 619.402 Small Business Administration procurement center representatives. ...

  16. Organ procurement: Spanish transplant procurement management.

    PubMed

    Manyalich, Martí; Mestres, Carlos A; Ballesté, Chloë; Páez, Gloria; Valero, Ricard; Gómez, María Paula

    2011-06-01

    Transplantation is an accepted therapeutic option to save or improve the quality of life when organ failure occurs or tissue replacements are needed. However, the lack of organs is the major limitation. The deceased organ procurement organization and professionals provide the solution to this international problem. In this review, we identify the elements involved in the organ procurement management process to analyze the possibility of implementation of deceased organ procurement for a transplantation program. While the donation rates are subject to several negative factors including religious, economic, cultural, and legal issues, the existence of well-trained professionals may considerably increase them. Professional training in organ donation along with the establishment of a solid organizational system has been identified as the crucial factor in developing efficient organ donation and transplantation programs.

  17. 41 CFR 301-71.106 - Who must sign a trip-by-trip authorization?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... authorization is Use of cash to procure common carrier transportation An official at as low an administrative.... Travel on a Government aircraft Determined under 41 CFR 101-37.405. Acceptance of payment from a non-Federal source for travel expenses An official at as low an administrative level as permitted by 41 CFR...

  18. 41 CFR 101-26.301 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 101-26.301 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301 Applicability. All executive agencies within the United States...

  19. 7 CFR 249.21 - Procurement and property management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Procurement and property management. 249.21 Section 249.21 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP...

  20. 7 CFR 249.21 - Procurement and property management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Procurement and property management. 249.21 Section 249.21 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP...

  1. 7 CFR 249.21 - Procurement and property management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Procurement and property management. 249.21 Section 249.21 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP...

  2. 7 CFR 225.17 - Procurement standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Procurement standards. 225.17 Section 225.17 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM General Administrative Provisions § 225.17...

  3. 7 CFR 225.17 - Procurement standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Procurement standards. 225.17 Section 225.17 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM General Administrative Provisions § 225.17...

  4. 7 CFR 225.17 - Procurement standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Procurement standards. 225.17 Section 225.17 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM General Administrative Provisions § 225.17...

  5. 7 CFR 225.17 - Procurement standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Procurement standards. 225.17 Section 225.17 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM General Administrative Provisions § 225.17...

  6. 48 CFR 19.402 - Small Business Administration procurement center representatives.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Small Business... FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation With the Small Business Administration 19.402 Small Business Administration procurement center representatives. (a)(1) The...

  7. 7 CFR 249.21 - Procurement and property management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Procurement and property management. 249.21 Section 249.21 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP...

  8. 7 CFR 249.21 - Procurement and property management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management. 249.21 Section 249.21 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP...

  9. 48 CFR 19.402 - Small Business Administration procurement center representatives.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Small Business... FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation With the Small Business Administration 19.402 Small Business Administration procurement center representatives. (a)(1) The...

  10. 48 CFR 19.402 - Small Business Administration procurement center representatives.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Small Business... FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation With the Small Business Administration 19.402 Small Business Administration procurement center representatives. (a)(1) The...

  11. 48 CFR 19.402 - Small Business Administration procurement center representatives.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Small Business... FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation With the Small Business Administration 19.402 Small Business Administration procurement center representatives. (a)(1) The...

  12. 48 CFR 19.402 - Small Business Administration procurement center representatives.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Small Business... FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation With the Small Business Administration 19.402 Small Business Administration procurement center representatives. (a)(1) The...

  13. 48 CFR 23.204 - Procurement exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR ® or FEMP-designated product if the head of the agency...

  14. 48 CFR 23.204 - Procurement exemptions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR® or FEMP-designated product if the head of the agency...

  15. 48 CFR 23.204 - Procurement exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR ® or FEMP-designated product if the head of the agency...

  16. 48 CFR 23.204 - Procurement exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR® or FEMP-designated product if the head of the agency...

  17. 48 CFR 23.204 - Procurement exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR ® or FEMP-designated product if the head of the agency...

  18. 48 CFR 725.705 - Local procurement-contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Local procurement-contract... DEVELOPMENT SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.705 Local procurement—contract clause. Local procurement may be undertaken in accordance with the provisions of 22 CFR...

  19. 48 CFR 725.705 - Local procurement-contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Local procurement-contract... DEVELOPMENT SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.705 Local procurement—contract clause. Local procurement may be undertaken in accordance with the provisions of 22 CFR...

  20. 7 CFR 226.22 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... pertinent to the following: rationale for the method of procurement, selection of contract type, contractor... competition. The description may include a statement of the qualitative nature of the material, product or... technical resources. (i) Program procurements shall be made by one of the following methods: (1) Small...

  1. Entrepreneurial ventures and whole-body donations: a regional perspective from the United States.

    PubMed

    Anteby, Michel; Hyman, Mikell

    2008-02-01

    Human cadavers are crucial to medical science. While the debate on how to secure sufficient cadavers has focused primarily on donors' behaviors, procuring organizations' roles in increasing donations remain less explored. The United States offers a unique setting in which to examine this question since entrepreneurial ventures supplying cadavers for medical science have recently emerged alongside traditional academic-housed programs, raising both hopes and fears about their impact on whole-body donations. To assess their potential impact, an archival survey of voluntary, in-state whole-body donors to two programs procuring in the same U.S. state was conducted. The programs' specimen recipients were also analyzed. One program is academic-housed and the other is an entrepreneurial venture. Both offered equal levels of financial support to donating parties. Eighty donations and 120 specimen shipping invoices from 2005 were analyzed in each program. Donations to the two programs did not significantly differ in terms of donors' sex, marital status, maximum educational level, and estimated hourly wage. The entrepreneurial venture's donors were, however, significantly younger, more likely to be from a minority group, and more likely to have died from cancer. For-profit organizations, continuing medical training organizations, and medical device companies were more likely recipients of the entrepreneurial venture's specimens. Non-profit and academic organizations were more likely recipients of the academic-housed program's specimens. These findings suggest that although the programs procured from a somewhat similar pool of donors, they also complemented one another. The entrepreneurial program procured donations that the academic-housed program often did not attract. Specimen recipients' distinct demands partly explain these procurement behaviors. Thus, organizational efforts to meet demands seem to shape the supply. Examining organizations alongside donors might provide new answers to secure donations.

  2. 7 CFR 248.21 - Procurement and property management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Procurement and property management. 248.21 Section 248.21 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) Miscellaneous...

  3. 7 CFR 248.21 - Procurement and property management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Procurement and property management. 248.21 Section 248.21 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) Miscellaneous...

  4. 7 CFR 248.21 - Procurement and property management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Procurement and property management. 248.21 Section 248.21 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) Miscellaneous...

  5. 7 CFR 248.21 - Procurement and property management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management. 248.21 Section 248.21 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) Miscellaneous...

  6. 7 CFR 248.21 - Procurement and property management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Procurement and property management. 248.21 Section 248.21 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) Miscellaneous...

  7. Procurement Cards Pave the Way to Efficient Purchasing.

    ERIC Educational Resources Information Center

    Enos, Eileen D.

    1999-01-01

    As educators battle restricted budgets, inflation, and enrollment changes, strategic sourcing management is replacing traditional transaction-based procurement. Procurement-card programs, allowing organizations to use credit cards for small purchases or low-value items, save time and enhance controls over merchants, credit limits, issuance limits,…

  8. 48 CFR 2903.602 - Exceptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... a contract from the policy in FAR 3.601, after the Procurement Review Board and the agency ethics... agency ethics official, the Procurement Review Board, and written approval by the Assistant Secretary for... director of the cognizant program office to the HCA. In the procurement request, the director must describe...

  9. 41 CFR 101-26.302 - Standard and optional forms.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...

  10. 41 CFR 101-26.301-1 - Similar items.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...

  11. 41 CFR 101-26.301-1 - Similar items.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....301-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...

  12. 41 CFR 101-26.301-1 - Similar items.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...

  13. 41 CFR 101-26.302 - Standard and optional forms.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...

  14. 41 CFR 101-26.301-1 - Similar items.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...

  15. 41 CFR 101-26.301-1 - Similar items.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...

  16. 41 CFR 101-26.302 - Standard and optional forms.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...

  17. 41 CFR 101-26.302 - Standard and optional forms.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...

  18. 41 CFR 101-26.302 - Standard and optional forms.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...

  19. 7 CFR 277.14 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... qualitative nature of the material, product or service desired and, when necessary, shall set forth those... technical resources. (g) Procurement methods. State agency procurements made in whole or in part with program funds shall be by one of the following methods: (1) Small purchase procedures are those relatively...

  20. 13 CFR 121.402 - What size standards are applicable to Federal Government Contracting programs?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Size Eligibility Requirements for Government Procurement § 121.402 What size standards are applicable... being purchased. Other factors considered include previous Government procurement classifications of the... to Federal Government Contracting programs? 121.402 Section 121.402 Business Credit and Assistance...

  1. 41 CFR 101-26.508-2 - Requisitioning data processing tape not available from Federal Supply Schedule contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requisitioning data...

  2. 49 CFR 624.9 - Grant requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF TRANSPORTATION CLEAN FUELS GRANT PROGRAM § 624.9 Grant requirements. A grant under this section... under lease or otherwise. (f) Use of competitive procurements. Pursuant to 49 U.S.C. 5307(d)(1)(E), the grant applicant shall certify that it will use competitive procurements and will not use procurements...

  3. 78 FR 19269 - Medicare and Medicaid Programs; Announcement of Application From a Hospital Requesting Waiver for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... Procurement Service Area AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS. ACTION: Notice with... require the hospital to enter into an agreement with its designated Organ Procurement Organization (OPO... Organ Procurement Organizations (OPOs) are not-for-profit organizations that are responsible for the...

  4. Army Tactical Missile System and Fixed-Wing Aircraft Capabilities in the Joint Time-Sensitive Targeting Process

    DTIC Science & Technology

    2006-01-01

    Air Force recently introduced the guided bomb unit ( GBU )- 39 small diameter bomb (SDB). This 250-pound class bomb is accurate and minimizes CD compared...munitions dispenser. The Navy has procured the AGM-154C, which carries a 500-pound unitary warhead. The Air Force expects to field the GBU - 39 SDB in

  5. The military operator's experience of reliability and maintainability characteristics

    NASA Astrophysics Data System (ADS)

    Jones, R. Mcc.

    An account is given of the British Army's approach to the achievement of high reliability and maintainability in rotorcraft during the procurement process. Attention is given to experience accumulated to date with the Gazelle, Scout, Agusta A109A, and Lynx helicopters; these offer lessons with respect to the Gem engine, fuel filtering, vibration, and an aircraft flight control system.

  6. 41 CFR 109-26.501-51 - Used vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Used vehicles. 109-26...-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 109-26.501-51 Used vehicles. Normally, DOE does not purchase or authorize contractors to purchase used motor vehicles. However, the Director...

  7. 41 CFR 109-26.501-51 - Used vehicles.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Used vehicles. 109-26...-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 109-26.501-51 Used vehicles. Normally, DOE does not purchase or authorize contractors to purchase used motor vehicles. However, the Director...

  8. 41 CFR 109-26.501-51 - Used vehicles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Used vehicles. 109-26...-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 109-26.501-51 Used vehicles. Normally, DOE does not purchase or authorize contractors to purchase used motor vehicles. However, the Director...

  9. 41 CFR 109-26.501-51 - Used vehicles.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Used vehicles. 109-26...-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 109-26.501-51 Used vehicles. Normally, DOE does not purchase or authorize contractors to purchase used motor vehicles. However, the Director...

  10. 41 CFR 109-26.501-51 - Used vehicles.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Used vehicles. 109-26...-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 109-26.501-51 Used vehicles. Normally, DOE does not purchase or authorize contractors to purchase used motor vehicles. However, the Director...

  11. Coast Guard Cutter Procurement: Background and Issues for Congress

    DTIC Science & Technology

    2013-07-24

    strategy for the OPC; Coast Guard Cutter Procurement: Background and Issues for Congress Congressional Research Service • the potential for using...Acquisition Strategy ........................................................... 24 2012 Testimony...Guard’s funding requests and acquisition strategies for the NSC, OPC, and FRC programs. Congress’s decisions on these three programs could

  12. 41 CFR 101-26.100-1 - Procurement of lowest cost items.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... similar items to meet particular end-use requirements under the GSA stock program, special order program... functional end-use procurement needs of the various ordering agencies. Therefore, in submitting requisitions... source from which the lowest cost item can be obtained which will adequately serve the functional end-use...

  13. 38 CFR 49.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... comply with Section 6002. Section 6002 requires that preference be given in procurement programs to the... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of... Federal funds shall give preference in their procurement programs funded with Federal funds to the...

  14. 48 CFR 926.7004 - Size standard for Energy Policy Act procurements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Size standard for Energy... ENERGY SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7004 Size standard for Energy Policy Act procurements. The size standard for...

  15. 48 CFR 926.7004 - Size standard for Energy Policy Act procurements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Size standard for Energy... ENERGY SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7004 Size standard for Energy Policy Act procurements. The size standard for...

  16. 48 CFR 926.7004 - Size standard for Energy Policy Act procurements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Size standard for Energy... ENERGY SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7004 Size standard for Energy Policy Act procurements. The size standard for...

  17. 48 CFR 926.7004 - Size standard for Energy Policy Act procurements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Size standard for Energy... ENERGY SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7004 Size standard for Energy Policy Act procurements. The size standard for...

  18. 41 CFR 101-26.301-2 - Issue of used, repaired, and rehabilitated items in serviceable condition.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Issue of used, repaired... and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items...

  19. Farmers’ Perceptions of Local Food Procurement, Mississippi, 2013

    PubMed Central

    Rosenberg, Nathan; Truong, Nhan L.; Russell, Tyler; Abdul-Haqq, Deja; Gipson, June A.

    2014-01-01

    We sought to understand the experiences and perceptions of food producers regarding food procurement programs for local institutions. A total of 72 (45%) Mississippi fruit and vegetable growers completed a mailed survey, and of those that reported selling to local businesses and institutions (54%), few were selling to schools (13%). The primary motivations to sell to institutions were to increase profits (67%) and to improve nutrition within their communities (57%), while the most commonly reported barrier was a lack of knowledge about how to sell to institutions (39%). Farm to institution programs must develop evidence-based practices designed to address barriers to producers’ participation in local institutional food procurement programs. PMID:24967828

  20. An Analysis of Department Of Defense Policy and Guidance for Implementation of Performance-Based Logistics

    DTIC Science & Technology

    2015-09-01

    agreement PBL performance based logistics PCO procuring contracting officer PHS&T packaging, handling, storage & transportation PM program manager...from which a program manager must decide, with the assistance of the program’s Procurement Contracting Officer ( PCO ). As one of the key tenets of PBL, a

  1. 41 CFR 101-26.501 - Purchase of new motor vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Purchase of new motor... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.501 Purchase of new motor vehicles. (a) It shall be the policy to procure commercially available motor vehicles, unless other vehicles are...

  2. 77 FR 20281 - Designation of Product Categories for Federal Procurement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... Security and Rural Investment Act of 2002, as amended by the Food, Conservation, and Energy Act of 2008.... Information regarding the Federal biobased preferred procurement program (one part of the BioPreferred Program... of 2002 (FSRIA), as amended by the Food, Conservation, and Energy Act of 2008 (FCEA), 7 U.S.C. 8102...

  3. Association between Travel Times and Food Procurement Practices among Female Supplemental Nutrition Assistance Program Participants in Eastern North Carolina

    ERIC Educational Resources Information Center

    Jilcott, Stephanie B.; Moore, Justin B.; Wall-Bassett, Elizabeth D.; Liu, Haiyong; Saelens, Brian E.

    2011-01-01

    Objective: To examine associations between self-reported vehicular travel behaviors, perceived stress, food procurement practices, and body mass index among female Supplemental Nutrition Assistance Program (SNAP) participants. Analysis: The authors used correlation and regression analyses to examine cross-sectional associations between travel time…

  4. 41 CFR 101-26.509 - Tabulating machine cards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Tabulating machine cards... PROGRAM 26.5-GSA Procurement Programs § 101-26.509 Tabulating machine cards. Procurement by Federal agencies of tabulating machine cards shall be made in accordance with the provisions of this § 101-26.509...

  5. The Potential Impact of Collaborative and Three-Dimensional Imaging Technology on SHIPMAIN Fleet Modernization Plan

    DTIC Science & Technology

    2008-01-01

    Degree in Business Administration and was commissioned an Ensign in April of 2002 via the Inservice Procurement Program. LT Seaman reported for duty as...Florida for duty as an instructor/trainer and ran the Emergency Medical Technician training program and served as an Affiliate Faculty for the American...Heart Association’s Basic Life Support Program. Through the Inservice Procurement Program, he was commissioned as an Ensign in the Medical Service

  6. The Potential Impact of Collaborative and Three-dimensional Imaging Technology on SHIPMAIN Fleet Modernization Plan

    DTIC Science & Technology

    2007-10-26

    Ensign in April of 2002 via the Inservice Procurement Program. LT Seaman reported for duty as a staff hospital corpsman assigned to Naval Hospital Camp...Emergency Medical Technician training program and served as an Affiliate Faculty for the American Heart Association’s Basic Life Support Program. Through...the Inservice Procurement Program, he was commissioned as an Ensign in the Medical Service Corps in April of 2002 and completed Officer

  7. Project CHECO Southeast Asia Report. SEAsia Glossary, 1961-1970

    DTIC Science & Technology

    1970-02-01

    47 conducted reconnaissance approximately three times a month over the Gulf of Tonkin. 3 BPE Best Preliminary Estimate BPP Border Patrol Police (Thai...education, training, public works, agriculture, transportation, communications, health, and other areas. Military and civic leaders work with local...VC term for Strategic Village captured and fortified for VC purposes. COMBAT HORNET (S) CONUS tests, training, and procurement for AC-119/K aircraft

  8. Analysis of the JSF Engine Competition

    DTIC Science & Technology

    2012-09-01

    even 25 Competition for Support Services  Support costs are typically more than half of life-cycle costs and normally incurred in a sole-source...Strike Fighter), Aircraft Engines, Competition, Military Procurement, Defense Industry, Cost Analysis Analysis of the JSF Engine Competition James...different designs to meet the same functional requirements. Such a case was examined by the Institute for Defense Analyses in a forward-looking cost and

  9. A Conceptual View of the Officer Procurement Model (TOPOPS). Technical Report No. 73-73.

    ERIC Educational Resources Information Center

    Akman, Allan; Nordhauser, Fred

    This report presents the conceptual design of a computer-based linear programing model of the Air Force officer procurement system called TOPOPS. The TOPOPS model is an aggregate model which simulates officer accession and training and is directed at optimizing officer procurement in terms of either minimizing cost or maximizing accession quality…

  10. Advance Planning Briefing for Industry: Information Dominance for the Full Spectrum Force.

    DTIC Science & Technology

    1997-05-29

    Electronic Order Processing is projected. The procurement will be a FFP ID/IQ award. BRIEFER: LTC Mary Fuller, Product Manager, Army Small Computer Program...will be a Best Value evaluation with a minimum of 2 awards. The procurement is planned to run for 2 years for ordering, Electronic Order Processing is...procurement is planned to run for three years for ordering, Electronic Order Processing is projected. The procurement will be a FFP ID/IQ award. BRIEFER

  11. 78 FR 54250 - Notice of Debarment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... procurement and non- procurement programs. Both the debarment and Voluntary Exclusion are for a period of ten... period of ten years. FOR FURTHER INFORMATION CONTACT: Hillary B. Burchuk, Trial Attorney, Federal...

  12. DOD can save millions by using energy efficient centralized aircraft support systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-05-07

    The ways the Department of Defense can save millions of dollars annually by using new energy efficient centralized aircraft support systems at certain Air Force and Navy bases are discussed. The Air Force and Navy have developed and installed several different systems and have realized some degree of success. However, each service has developed its systems independently. Consequently, there is no commonality between the services' systems which could permit economical procurements for standard servicewide systems. Standardization would also prevent duplication of design efforts by the services and minimize proliferation of aircraft support equipment. It also would allow the services tomore » further reduce costs by combining requirements to assure the most economical quantities for buying system components. GAO makes specific recommendations to the Secretaries of Defense and the Air Force to develop standard systems and to install them at all bases where feasible and practical.« less

  13. The impact of HTA and procurement practices on the selection and prices of medical devices.

    PubMed

    Callea, Giuditta; Armeni, Patrizio; Marsilio, Marta; Jommi, Claudio; Tarricone, Rosanna

    2017-02-01

    Technological innovation in healthcare yields better health outcomes but also drives healthcare expenditure, and governments are struggling to maintain an appropriate balance between patient access to modern care and the economic sustainability of healthcare systems. Health Technology Assessment (HTA) and centralized procurement are increasingly used to govern the introduction and diffusion of new technologies in an effort to make access to innovation financially sustainable. However, little empirical evidence is available to determine how they affect the selection of new technologies and unit prices. This paper focuses on medical devices (MDs) and investigates the combined effect of various HTA governance models and procurement practices on the two steps of the MD purchasing process (i.e., selecting the product and setting the unit price). Our analyses are based on primary data collected through a national survey of Italian public hospitals. The Italian National Health Service is an ideal case study because it is highly decentralized and because regions have adopted different HTA governance models (i.e., regional, hospital-based, double-level or no HTA), often in combination with centralized regional procurement programs. Hence, the Italian case allows us to test the impact of different combinations of HTA models and procurement programs in the various regions. The results show that regional HTA increases the probability of purchasing the costliest devices, whereas hospital-based HTA functions more like a cost-containment unit. Centralized regional procurement does not significantly affect MD selection and is associated with a reduction in the MD unit price: on average, hospitals located in regions with centralized procurement pay 10.1% less for the same product. Hospitals located in regions with active regional HTA programs pay higher prices for the same device (+23.2% for inexpensive products), whereas hospitals that have developed internal HTA programs pay 8.3% on average more for the same product. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  14. REDUCTIONS WITHOUT REGRET: DEFINING THE NEEDED CAPABILITIES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swegle, J.; Tincher, D.

    This is the second of three papers (in addition to an introductory summary) aimed at providing a framework for evaluating future reductions or modifications of the U.S. nuclear force, first by considering previous instances in which nuclear-force capabilities were eliminated; second by looking forward into at least the foreseeable future at the features of global and regional deterrence (recognizing that new weapon systems currently projected will have expected lifetimes stretching beyond our ability to predict the future); and third by providing examples of past or possible undesirable outcomes in the shaping of the future nuclear force, as well as somemore » closing thoughts for the future. This paper begins with a discussion of the current nuclear force and the plans and procurement programs for the modernization of that force. Current weapon systems and warheads were conceived and built decades ago, and procurement programs have begun for the modernization or replacement of major elements of the nuclear force: the heavy bomber, the air-launched cruise missile, the ICBMs, and the ballistic-missile submarines. In addition, the Nuclear Weapons Council has approved a new framework for nuclear-warhead life extension not fully fleshed out yet that aims to reduce the current number of nuclear explosives from seven to five, the so-called 3+2 vision. This vision includes three interoperable warheads for both ICBMs and SLBMs (thus eliminating one backup weapon) and two warheads for aircraft delivery (one gravity bomb and one cruise-missile, eliminating a second backup gravity bomb). This paper also includes a discussion of the current and near-term nuclear-deterrence mission, both global and regional, and offers some observations on future of the strategic deterrence mission and the challenges of regional and extended nuclear deterrence.« less

  15. Standard spacecraft procurement analysis: A case study in NASA-DoD coordination in space programs. Ph.D. Thesis - Rand Graduate Inst.

    NASA Technical Reports Server (NTRS)

    Harris, E. D.

    1980-01-01

    The Space Test Program Standard Satellite (STPSS), a design proposed by the Air Force, and two NASA candidates, the Applications Explorer Mission spacecraft (AEM) and the Multimission Modular Spacecraft (MMS), were considered during the first phase. During the second phase, a fourth candidate was introduced, a larger, more capable AEM (L-AEM), configured by the Boeing Company under NASA sponsorship to meet the specifications jointly agreed upon by NASA and the Air Force. Total program costs for a variety of procurement options, each of which is capable of performing all of the Air Force Space Test Program missions during the 1980-1990 time period, were used as the principal measure for distinguishing among procurement options. Program cost does not provide a basis for choosing among the AEM, STPSS, and MMS spacecraft, given their present designs. The availability of the L-AEM spacecraft, or some very similar design, would provide a basis for minimizing the cost of the Air Force Space Test Program.

  16. Economic Effects of Noise Abatement Regulations on the Helicopter Industry.

    DTIC Science & Technology

    1982-12-01

    industry is heavily subsidized through government procurement , and aircraft models are tailored to meet commercial and military applications. U.S...EFFECTS OF NOISE ABATEMENT REGULATIONS ON THE HELICOPTER INDUSTRY by Alexander Nicholson Conner December, 1982 _J LA.. Thesis Advisor: M. G. Sovereiqn...Master’s thesis; * ~ECONOMIC EFFECTS OF NOISE ABATDEMT REGULATIONS ~ *18 S. pp@gwe 000. 46060T ftuee ON THE HELICOPTER INDUSTRY -T. Amse U.CMYAY NSNK

  17. Guidebook for Preparation of Aircraft System Survivability Requirements for Procurement Documents.

    DTIC Science & Technology

    1977-05-01

    Hardening for Electrical arid Electronic EqJuipment .. ... .... .... ..... 91 8.6.5~ Crew Protection from Radioactive Particulate Matter .. ... ..... 93...compatible with the subject matter of the individual sections. These guidelines present alternate language for both general requirements and specific...relation to the threat." 18 I. # . .. . ..o JTCG/AS-77-D-001 "’ Pasive IR suppression will be designed into the air vehicle utilizing a combination of hot

  18. Public perspectives on biospecimen procurement: what biorepositories should consider.

    PubMed

    L'Heureux, Jamie; Murray, Jeffrey C; Newbury, Elizabeth; Shinkunas, Laura; Simon, Christian M

    2013-06-01

    Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus "direct" procurement strategies such as the drawing of blood. Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens.

  19. Evaluation of Electric Power Procurement Strategies by Stochastic Dynamic Programming

    NASA Astrophysics Data System (ADS)

    Saisho, Yuichi; Hayashi, Taketo; Fujii, Yasumasa; Yamaji, Kenji

    In deregulated electricity markets, the role of a distribution company is to purchase electricity from the wholesale electricity market at randomly fluctuating prices and to provide it to its customers at a given fixed price. Therefore the company has to take risk stemming from the uncertainties of electricity prices and/or demand fluctuation instead of the customers. The way to avoid the risk is to make a bilateral contact with generating companies or install its own power generation facility. This entails the necessity to develop a certain method to make an optimal strategy for electric power procurement. In such a circumstance, this research has the purpose for proposing a mathematical method based on stochastic dynamic programming and additionally considering the characteristics of the start-up cost of electric power generation facility to evaluate strategies of combination of the bilateral contract and power auto-generation with its own facility for procuring electric power in deregulated electricity market. In the beginning we proposed two approaches to solve the stochastic dynamic programming, and they are a Monte Carlo simulation method and a finite difference method to derive the solution of a partial differential equation of the total procurement cost of electric power. Finally we discussed the influences of the price uncertainty on optimal strategies of power procurement.

  20. Defense Procurement: An Analysis of Contract Management Internal Controls

    DTIC Science & Technology

    2015-03-22

    monitoring activities component of the internal control framework. Acquisition Research Program Graduate School of Business & Public Policy - 7...Research Program Graduate School of Business & Public Policy - 24 - Naval Postgraduate School Tan, L. H. J. (2013). An analysis of internal controls and...Naval Postgraduate School, Monterey, CA 93943. Defense Procurement: An Analysis of Contract Management Internal Controls 22 March 2015 Dr. Juanita

  1. 13 CFR 124.503 - How does SBA accept a procurement for award through the 8(a) BD program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false How does SBA accept a procurement for award through the 8(a) BD program? 124.503 Section 124.503 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION 8(a) BUSINESS DEVELOPMENT/SMALL DISADVANTAGED BUSINESS STATUS DETERMINATIONS 8(a...

  2. Long-Term Implications of the 2016 Future Years Defense Program

    DTIC Science & Technology

    2016-01-01

    operation and maintenance activities; acquisition includes research, development, test, and evaluation as well as procurement of weapon systems and other...group includes procurement and research, development, test, and evaluation (RDT&E). Appropriations for procurement fund the purchase of new weapon...and Evaluation Military Construction Family Housing OCO Funding Actual FYDP Period Beyond the FYDP PeriodDoD’s Estimates For 2017 through 2020 DoD

  3. Benefits of Transplant Procurement Management (TPM) specialized training on professional competence development and career evolutions of health care workers in organ donation and transplantation.

    PubMed

    Istrate, Melania G; Harrison, Tyler R; Valero, Ricard; Morgan, Susan E; Páez, Gloria; Zhou, Quan; Rébék-Nagy, Gábor; Manyalich, Martí

    2015-04-01

    Training on organ donation and transplantation is relevant for transplantation improvement. This study aimed at investigating the perceived benefits of Transplant Procurement Management training programs on professional competence development and career evolutions of health care workers in organ donation and transplantation. An online survey was developed in 5 languages (Spanish, English, Italian, French, and Portuguese) and its link was emailed to 6839 individuals. They were asked to forward it to other professionals in organ donation and transplantation. The link was also shared on Facebook and at relevant congresses. Two research questions on the perceived influence of specialized training programs were identified. A total of 1102 participants (16.1%) took the survey; 87% reported participating in Transplant Procurement Management training programs, of which 95% selected Transplant Procurement Management courses as the most influential training they had participated in. For research question one, 98% reported influence on knowledge (score 4.5 [out of 5]), 93% on technical (4.2) and communication skills (4.1), 89% on attitude toward organ donation and transplantation (4.1), 92% on motivation to work (4.2), 91% on desire to innovate (4.0), 87% and 79% on ability to change organ donation and trans plantation practices (3.9) and policies (3.5). For research question 2, main and interaction effects for position at the time of training and type of training were reported. Transplant Procurement Management training programs had positive perceived effects.

  4. Food commodity pipeline management in transitional settings: challenges and lessons learned from the first USAID food development program in South Sudan

    PubMed Central

    Tappis, Hannah; Doocy, Shannon; Amoako, Stephen

    2013-01-01

    ABSTRACT Despite decades of support for international food assistance programs by the U.S. Agency for International Development (USAID) Office of Food for Peace, relatively little is known about the commodity pipeline and management issues these programs face in post-conflict and politically volatile settings. Based on an audit of the program's commodity tracking system and interviews with 13 key program staff, this case study documents the experiences of organizations implementing the first USAID-funded non-emergency (development) food assistance program approved for Sudan and South Sudan. Key challenges and lessons learned in this experience about food commodity procurement, transport, and management may help improve the design and implementation of future development food assistance programs in a variety of complex, food-insecure settings around the world. Specifically, expanding shipping routes in complex political situations may facilitate reliable and timely commodity delivery. In addition, greater flexibility to procure commodities locally, rather than shipping U.S.-procured commodities, may avoid unnecessary shipping delays and reduce costs. PMID:25276532

  5. Evaluation of the Advanced Subsonic Technology Program Noise Reduction Benefits

    NASA Technical Reports Server (NTRS)

    Golub, Robert A.; Rawls, John W., Jr.; Russell, James W.

    2005-01-01

    This report presents a detailed evaluation of the aircraft noise reduction technology concepts developed during the course of the NASA/FAA Advanced Subsonic Technology (AST) Noise Reduction Program. In 1992, NASA and the FAA initiated a cosponsored, multi-year program with the U.S. aircraft industry focused on achieving significant advances in aircraft noise reduction. The program achieved success through a systematic development and validation of noise reduction technology. Using the NASA Aircraft Noise Prediction Program, the noise reduction benefit of the technologies that reached a NASA technology readiness level of 5 or 6 were applied to each of four classes of aircraft which included a large four engine aircraft, a large twin engine aircraft, a small twin engine aircraft and a business jet. Total aircraft noise reductions resulting from the implementation of the appropriate technologies for each class of aircraft are presented and compared to the AST program goals.

  6. 77 FR 63669 - Notice of FTA Transit Program Changes, Authorized Funding Levels and Implementation of the Moving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... Testing 11. Buy America 12. Corridor Preservation 13. Rail Car Procurements 14. Veterans Preference... transit assistance; to conduct State Safety Oversight, drug and alcohol, civil rights, procurement systems...

  7. Issues With Access to Acquisition Data and Information in the Department of Defense

    DTIC Science & Technology

    2017-01-01

    both procurement and operations), technical performance, contracts and contractor performance, and program decision memo- randa. These data are...the cost of weapon systems (both procurement and operations), techni- cal performance, contracts and contractor performance, and program decision...and tracking sensitive data, and 19 percent have no method at all (Trustwave, 2014, p. 4; Kerner, 2014). U.S. defense contractors face similar

  8. Standard spacecraft economic analysis. Volume 2: Findings and conclusions

    NASA Technical Reports Server (NTRS)

    Harris, E. D.; Large, J. P.

    1976-01-01

    The comparative program costs associated with use of various standardized spacecraft for Air Force space test program missions to be flown on the space shuttle were studied in two phases. In the first phase, a variety of procurement mixes composed of existing or programmed NASA standard spacecraft designs and an Air Force standard spacecraft design were considered. The second phase dealt with additional procurement options using an upgraded version of an existing NASA design. The results of both phases are discussed.

  9. 14 CFR 91.1109 - Aircraft maintenance: Inspection program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Aircraft maintenance: Inspection program... Ownership Operations Program Management § 91.1109 Aircraft maintenance: Inspection program. Each program... conduct of inspections for the particular make and model aircraft, including necessary tests and checks...

  10. 14 CFR 91.1109 - Aircraft maintenance: Inspection program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Aircraft maintenance: Inspection program... Ownership Operations Program Management § 91.1109 Aircraft maintenance: Inspection program. Each program... conduct of inspections for the particular make and model aircraft, including necessary tests and checks...

  11. 14 CFR 91.1109 - Aircraft maintenance: Inspection program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Aircraft maintenance: Inspection program... Ownership Operations Program Management § 91.1109 Aircraft maintenance: Inspection program. Each program... conduct of inspections for the particular make and model aircraft, including necessary tests and checks...

  12. One-on-one care management and procurement of Naloxone for ambulatory use.

    PubMed

    Whittington, Richard; Whittington, Kathleen; Whittington, John; Porter, Joel; Zimmermann, Karla; Case, Holly; Berg, Stacey

    2018-02-16

    Morbidity and mortality from prescription opioids has reached unprecedented levels. Opioids remain part of chronic pain treatment in primary care. This study was designed to determine whether one-on-one care management increases procurement of Naloxone, an opioid antagonist shown to reduce morbidity and mortality in opioid overdoses. Participants included all patients ≥18 years enrolled in a primary care-based chronic pain management program and who were prescribed a daily dose of opioids for treatment of chronic pain. In total, 153 patients chose to participate. Each had a 1 h one-on-one education meeting with a registered nurse. Among the enrolled, eight patients (5.2%) had procured Naloxone prior to intervention. Overall, 31 additional patients (20.2%) procured Naloxone after intervention, a 288% relative improvement in the attainment of Naloxone (P < 0.0001) (χ2 = 29.032 with 1 degree freedom). Of the 114 participants who never procured Naloxone, 69.3% believed it was unnecessary, 20% forgot about Naloxone, 8% said it was cost prohibitive, 3.5% had access concerns and 0.9% had concerns about side effects. Direct one-on-one nurse care management sessions were associated with an increased procurement of Naloxone in a primary care-based pain management program. A significant number of patients believed Naloxone was unnecessary after the intervention.

  13. Teal Ruby Experiment. Phase I Definition Study. Volume I. Part 2. Appendixes

    DTIC Science & Technology

    1977-05-01

    degree, Engineering Mechanics, Stanford University; M.S., Physics, New Mexico State University; B.A., Mathematics, Uaiversity of California atLos...Receiving Inspection Supervisor, military aircraft parts and materials * M.B.A., Mexico City College; Industrial Engineering, General Motors Institute A...S$Act ..MCA!y. f A SuiSn.•..v Of t¢OCtNI1 AI*CIATf COIOV*A,*ON LMSC-5699533 RICHARD- C. SEXT -ON -. Material Procurement Responsibilities

  14. Business Process Reengineering in the Inventory Management to Improve Aircraft Maintenance Operations in the Indonesian Air Force

    DTIC Science & Technology

    2006-06-01

    Headquarters ( MABES TNI) for priority analysis. After that, MABES TNI submits the proposals to the DOD for procurement processes. (Republic of Indonesia... James E., Ernst and Young, “The New Industrial Engineering: Information Technology and Business Process Redesign.” In Business Process Reengineering...The Art of Balancing, Harvard Business Review, November-December 1993. Grover, Varun, Teng, James T.C., and Fiedler, Kirk D., “Technological and

  15. Technical change in US industry: A cross-industry analysis

    NASA Technical Reports Server (NTRS)

    Nelson, R. R. (Editor)

    1981-01-01

    The nature of the public policies which have influenced the pace and pattern of technical progress in a number of American industries is studied with the view of assessing the broad effects of these policies. The industries studied are agriculture, pharmaceuticals, semiconductors, computers, civil aircraft, automobiles and residential construction. The policies considered include research and development funding as well as government procurement, education, information dissemination, patent protection, licensing, regulations, and anti-trust policies.

  16. Hybrid Aircraft for Heavy Lift / High Speed Strategic Mobility

    DTIC Science & Technology

    2011-04-01

    Those advancements that reduce onboard power requirements are beneficial, whether high efficiency lighting or computing, innovative cargo management ...of operations projected to become more common in the 2035 time frame. This paper proposes that the US military procure a new class of vehicle to...first attempt to fly a HA was made by Alberto Santos-Dumont, a Brazilian living in France and a pioneer in the controlled flight of airships. In 1905

  17. Navy Did Not Develop Processes in the Navy Enterprise Resource Planning System to Account for Military Equipment Assets

    DTIC Science & Technology

    2013-07-18

    Department of the Navy ERP Enterprise Resource Planning FMO Office of Financial Operations NAVAIR Naval Air Systems Command NAVSEA Naval...supported by business processes in the Navy Enterprise Resource Planning ( ERP ) system for the Aircraft, Shipbuilding, and Weapons Procurement...appropriations. What We Found Department of the Navy Office of Financial Operations officials did not use the Navy ERP system to support $416 billion in

  18. F-15E Beddown at Seymour Johnson AFB, North Carolina

    DTIC Science & Technology

    1988-03-01

    fuel tanks for extended range, an expanded weapons capacity, and LANTIRN for enhanced night operations. Procurement of 392 F-15Es is required to address...target recognizer. These capabilities permit the pilot of a single or dual seat aircraft to deliver guided and 1.1-i unguided weapons under day/night...functional subsystems. The targeting pod permits day or night precision delivery of conventional, laser guided bomb, and electro-optical weapons . The

  19. Public Perspectives on Biospecimen Procurement: What Biorepositories Should Consider

    PubMed Central

    L'Heureux, Jamie; Murray, Jeffrey C.; Newbury, Elizabeth; Shinkunas, Laura

    2013-01-01

    Purpose Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus “direct” procurement strategies such as the drawing of blood. Methods Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. Results The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Conclusion Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens. PMID:24850089

  20. Study of education program of in-hospital procurement transplant coordinators in Japan.

    PubMed

    Fukushima, N; Konaka, S; Yasuhira, M; Izawa, M

    2014-01-01

    As the number of donated organs is still extremely small in Japan compared with other developed countries, in-hospital procurement transplant coordinators (In-Hp PTC) may play an important role in increasing organ donation and making the procurement procedure smoother. In this study, our education program of In-Hp PTC is described. In May 2012, our department started the In-Hp PTC Education Program. In the first semester, a 2-hour lecture is provided every 2 weeks for 5 months to 15 In-Hp PTCs working near Osaka. In the second semester, 20 lectures were provided for 3 consecutive days to 31 In Hp PTCs, more than 80% of whom work far from Osaka. Lecture topics were the history and current status of organ donation in Japan, social regulation of organ donation, care of transplant recipients, overall procedures of organ donation, the role of In-Hp PTC, donor family care, donor indications, and donor assessment and management. Lectures also included simulations of the organ donation process. Participants were surveyed for their opinions after the program, Most participants were satisfied with the program, topics and duration. As most of them are not full-time In-Hp PTCs, they preferred to attend the 3-day program. Many participants are currently working as main In-Hp PTCs and establishing their own organ donation system in their hospital. In-Hp PTCs have an important role to play in establishing an organ procurement system and increasing organ donation in Japan. This program may help establish a systematic education program for this occupation in Japan. Copyright © 2014 Elsevier Inc. All rights reserved.

  1. 45 CFR 1309.52 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION Construction and Major Renovation § 1309.52 Procurement procedures. (a) All facility construction and major renovation transactions...

  2. 45 CFR 1309.52 - Procurement procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION Construction and Major Renovation § 1309.52 Procurement procedures. (a) All facility construction and major renovation transactions...

  3. 13 CFR 124.502 - How does an agency offer a procurement to SBA for award through the 8(a) BD program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... history, if any, of the requirement; (10) The names and addresses of any small business contractors which... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false How does an agency offer a procurement to SBA for award through the 8(a) BD program? 124.502 Section 124.502 Business Credit and...

  4. 78 FR 41694 - Final Priority and Requirements; Education Facilities Clearinghouse

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... the collection and dissemination of best practices for the planning, design, financing, procurement... Facilities Clearinghouse program is to provide technical assistance and training on the planning, design... dissemination of best practices for the planning, design, financing, procurement, construction, improvement...

  5. 13 CFR 121.410 - What are the size standards for SBA's Section 8(d) Subcontracting Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Size Eligibility Requirements for Government Procurement § 121.410 What are the size standards for SBA... Small Business Act, a concern is small for subcontracts which relate to Government procurements if it...

  6. FY 1978 aeronautics and space technology program summary

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Highlights of the aeronautics program include research on aircraft energy efficiency, supersonic cruise aircraft, vertical takeoff and landing aircraft, short haul/short takeoff and landing aircraft, and general aviation aircraft. The space technology program includes work on space structures, propulsion systems, power systems, materials, and electronics.

  7. Competitive Advantage, Uncertainty, and Weapons Procurement: Striking Balance for the Future

    DTIC Science & Technology

    2009-05-02

    position of the Department of the Army, Department of Defense, or the U.S. Government. COMPETITIVE ADVANTAGE , UNCERTAINTY, AND WEAPONS PROCUREMENT: STRIKING...Competitive Advantage , Uncertainty, and Weapons Procurement: Striking Balance for the Future 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...the right balance of investments all leading to a sustained competitive advantage . This paper presents an analysis of how effective this overhaul has

  8. M2-F1 mounted in NASA Ames Research Center 40x80 foot wind tunnel

    NASA Technical Reports Server (NTRS)

    1962-01-01

    After the first attempted ground-tow tests of the M2-F1 in March 1963, the vehicle was taken to the Ames Research Center, Mountain View, CA, for wind-tunnel testing. During these tests, Milt Thompson and others were in the M2-F1 to position the control surfaces for each test. The wingless, lifting body aircraft design was initially conceived as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  9. M2-F1 on lakebed with pilot Milt Thompson

    NASA Technical Reports Server (NTRS)

    1963-01-01

    NASA Flight Research Pilot Milt Thompson, shown here on the lakebed with the M2-F1 lifting body, was an early backer of R. Dale Reed's lifting-body proposal. He urged Flight Research Center director Paul Bikle to approve the M2-F1's construction. Thompson also made the first glide flights in both the M2-F1 and its successor, the heavyweight M2-F2. The wingless, lifting body aircraft design was initially conceived as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, NASA Flight Research Center (later Dryden Flight Research Center, Edwards, CA) management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  10. Wooden shell of M2-F1 being assembled at El Mirage

    NASA Technical Reports Server (NTRS)

    1962-01-01

    Wooden shell of the M2-F1 being assembled at El Mirage, CA. While Flight Research Center technicians built the internal steel structure of the M2-F1, sailplane builder Gus Briegleb built the vehicle's outer wooden shell. Its skin was 3/32-inch mahogany plywood, with 1/8-inch mahogany rib sections reinforced with spruce. The wingless, lifting body aircraft design was initially conceived as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  11. M2-F1 simulator cockpit

    NASA Technical Reports Server (NTRS)

    1963-01-01

    This early simulator of the M2-F1 lifting body was used for pilot training, to test landing techniques before the first ground tow attempts, and to test new control configurations after the first tow attempts and wind-tunnel tests. The M2-F1 simulator was limited in some ways by its analog simulator. It had only limited visual display for the pilot, as well. The wingless, lifting body aircraft design was initially conceived as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  12. M2-F1 in flight during low-speed car tow

    NASA Technical Reports Server (NTRS)

    1963-01-01

    The M2-F1 shown in flight during a low-speed car tow runs across the lakebed. Such tests allowed about two minutes to test the vehicle's handling in flight. NASA Flight Research Center (later redesignated the Dryden Flight Research Center) personnel conducted as many as 8 to 14 ground-tow flights in a single day either to test the vehicle in preparation for air tows or to train pilots to fly the vehicle before they undertook air tows. The wingless, lifting body aircraft design was initially concieved as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  13. M2-F1 cockpit

    NASA Technical Reports Server (NTRS)

    1963-01-01

    This photo shows the cockpit configuration of the M2-F1 wingless lifting body. With a top speed of about 120 knots, the M2-F1 had a simple instrument panel. Besides the panel itself, the ribs of the wooden shell (left) and the control stick (center) are also visible. The wingless, lifting body aircraft design was initially conceived as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  14. M2-F1 in flight over lakebed on tow line

    NASA Technical Reports Server (NTRS)

    1963-01-01

    After initial ground-tow flights of the M2-F1 using the Pontiac as a tow vehicle, the way was clear to make air tows behind a C-47. The first air tow took place on 16 August 1963. Pilot Milt Thompson found that the M2-F1 flew well, with good control. This first flight lasted less than two minutes from tow-line release to touchdown. The descent rate was 4,000 feet per minute. The wingless, lifting body aircraft design was initially concieved as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  15. M2-F1 fabrication by Grierson Hamilton, Bob Green, and Ed Browne

    NASA Technical Reports Server (NTRS)

    1962-01-01

    Flight Research Center discretionary funds paid for the M2-F-1's construction. NASA mechanics, sheet-metal smiths, and technicians did much of the work in a curtained-off area of a hangar called the 'Wright Bicycle Shop.' The wingless, lifting body aircraft design was initially conceived as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  16. Internal steel structure of M2-F1

    NASA Technical Reports Server (NTRS)

    1963-01-01

    The internal steel structure for the M2-F1 was built at the Flight Research Center (predecessor of the Dryden Flight Research Center, Edwards, CA) in a section of the calibration hangar dubbed 'Wright Bicycle Shop.' Visible are the stick, rudder pedals, and ejection seat. The external wooden shell was attached to the steel structure. The wingless, lifting body aircraft design was initially conceived as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  17. Program to compute the positions of the aircraft and of the aircraft sensor footprints

    NASA Technical Reports Server (NTRS)

    Paris, J. F. (Principal Investigator)

    1982-01-01

    The positions of the ground track of the aircraft and of the aircraft sensor footprints, in particular the metric camera and the radar scatterometer on the C-130 aircraft, are estimated by a program called ACTRK. The program uses the altitude, speed, and attitude informaton contained in the radar scatterometer data files to calculate the positions. The ACTRK program is documented.

  18. M2-F1 lifting body aircraft on a flatbed truck

    NASA Technical Reports Server (NTRS)

    1997-01-01

    After the grounding of the M2-F1 in 1966, it was kept in outside storage on the Dryden complex. After several years, its fabric and plywood structure was damaged by the sun and weather. Restoration of the vehicle began in February 1994 under the leadership of NASA retiree Dick Fischer, with other retirees who had originally worked on the M2-F1's construction and flight research three decades before also participating. The photo shows the now-restored M2-F1 returning to the site of its flight research, now called the Dryden Flight Research Center, on 22 August 1997. The wingless, lifting body aircraft design was initially conceived as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, NASA Flight Research Center (later Dryden Flight Research Center, Edwards, CA) management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  19. NASA aeronautics

    NASA Technical Reports Server (NTRS)

    Anderton, D. A.

    1982-01-01

    Aeronautical research programs are discussed in relation to research methods and the status of the programs. The energy efficient aircraft, STOL aircraft and general aviation aircraft are considered. Aerodynamic concepts, rotary wing aircraft, aircraft safety, noise reduction, and aircraft configurations are among the topics included.

  20. 7 CFR 2902.4 - Procurement programs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF ENERGY POLICY AND NEW USES... Federal Procurement Policy, in cooperation with USDA, has the responsibility to coordinate this policy's... policy of awarding contracts to the vendor offering a designated item composed of the highest percentage...

  1. 7 CFR 2902.4 - Procurement programs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF ENERGY POLICY AND NEW USES... Federal Procurement Policy, in cooperation with USDA, has the responsibility to coordinate this policy's... policy of awarding contracts to the vendor offering a designated item composed of the highest percentage...

  2. Human Body Size in Military Aircraft and Personal Equipment

    DTIC Science & Technology

    1946-06-01

    manufacturers and others for use in the manufacti or purchase of supplies, or for any other purpose, the Goernment assumes responsibility nor obligation... responsibility ’ of the designer and the manufacturer to h’ave provided:tolerancesin the plane in’ order to insure efficient installation of the equipment...ional dependability. At the out-break of Y;orld Tar II, the Army Air Forces had no responsibility .n the development and procurement of flying clothing

  3. Particulate Characterization and Control Evaluation for Carbon Fiber Composite Aircraft Crash Recovery Operations

    DTIC Science & Technology

    2010-03-01

    Advanced Composite Office, Wright-Patterson BEE Flight, and USAFSAM for their help procuring the materials and supplies needed to perform this study...through the cyclone. (Cohen & Charles S . McCammonn, 2001) The major limitation of the cyclone is that the cut curve of the cyclone does not precisely...If the pump is not precisely calibrated to the specified flow the cut point will be altered. (Cohen & Charles S . McCammonn, 2001) Once the sample

  4. RADC Thermal Guide for Reliability Engineers.

    DTIC Science & Technology

    1982-06-01

    sis in government procurements has been to tailor the (e.g., cockpit or crew area) environmental definition to the equipment’s intended use, thereby...AD- AIIB 839 HUGHES AIRCRAFT CO CULVER CITY CA F/G 20/13 ,RAUC THERMAL GUIDE FOR RELIABILITY ENSINEERS (U)’ JUN 82 6 N MORRISON. J N KALLIS. L A...Yet many a reliability engineer has little or no knowledge of thermal design and analysis. Moreover, texts and government handbooks published to

  5. The C-17: An Attempt at Increased Airlift Versatility.

    DTIC Science & Technology

    1985-06-07

    prevented the C-5A from completely fulfilling its original concept goals. While instituting the strategic role of the giant aircraft, the Air Force...expected to close its Marietta, Georgia facility as the C-130 and C-141 . prgrams wound to a close. It can be speculated that cost, idle production...Package Procurement Process 58 * 1’ was precisely what it was designed to prevent ; uncontrolled cost in defense weapons acquisition. In spite of all

  6. Evolution of Flying Qualities Analysis: Problems for a New Generation of Aircraft

    DTIC Science & Technology

    2010-03-29

    reflect further acquisition strategy changes in 2002.31 These changes reflected a desire by procurement agencies to keep up with the ever changing and more...scientists, . . . ”79 By using a Learner -Centered approach,80 and Problem Based Learning (PBL)81,82 as a baseline pedagogy, the authors have been...response is required, the boundaries for LOES would have to be redefined. The use of nonconventional response types to best meet different mission task

  7. Navy Ship Names: Background for Congress

    DTIC Science & Technology

    2009-11-17

    eventually fuel the steam-powered navy of the United States. (11) The first Pope to set foot on United States sovereign territory was Pius IX onboard...ships were named for World War II -era Navy aircraft carriers and earlier Navy ships. • Lewis and Clark (TAKE-1) class cargo and ammunition ships are...the Pacific in World War II . Nimitz died in 1966, the same year that Congress considered the FY1967 defense budget that funded the procurement of

  8. Roles of sex and ethnicity in procurement coordinator--family communication during the organ donation discussion.

    PubMed

    Baughn, Daniel; Auerbach, Stephen M; Siminoff, Laura A

    2010-09-01

    Interpersonal relations with health care providers influence families' decisions to consent to solid-organ donation. However, previous research has been based on retrospective interviews with donation-eligible families and has not directly examined the interpersonal interactions between families and organ procurement coordinators. To increase understanding of the interpersonal interaction between procurement coordinators and families during the organ donation discussion, with special attention to the influence of the sex and race of the procurement coordinator and the race of the potential donor's family. A descriptive study in which standardized patients portrayed family members interacting with actual procurement coordinators in simulated donation request scenarios. Thirty-three videotaped interactions between standardized patients and 17 procurement coordinators involving 2 different scenarios depicting deceased donation were evaluated. Video recordings were rated by independent coders. Coders completed the Impact Message Inventory-Form C, the Participatory Style of Physician Scale, and the Siminoff Communication and Content and Affect Program-Global Observer Ratings scale. African American procurement coordinators, particularly African American women, were rated as more controlling and work-oriented than white procurement coordinators. Male procurement coordinators were more affiliative with the white family than the African American family, whereas female procurement coordinators were slightly less affiliative with the white family. African American procurement coordinators expressed more positive affect when interacting with the African American family than the white family, whereas the opposite was true for white procurement coordinators. Research is needed to cross-validate these exploratory findings and further examine cultural mistrust between procurement coordinators and families of ethnic minorities, especially given the negative attitudes of many minorities toward donation.

  9. FY 1972-1976 Defense Program and the 1972 Defense Budget.

    DTIC Science & Technology

    1971-03-01

    Thai Government. This assessment was given me by Thai officials during my recent visit there. Insurgents along the Thai/ Malaysian border are under the...Development and Initial Procurement of Maverick Air-to-Ground Missile 31 87 Air Superiority and Air Defense Continued Procurement of F-4 Air Force Fighter... MAVERICK . The MAVERICK is another program that is of importance in providing increased capabilities for support of troops on the battlefield. MAVERICK is

  10. University Program Management Information System

    NASA Technical Reports Server (NTRS)

    2001-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA' objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  11. University Program Management Information System

    NASA Technical Reports Server (NTRS)

    Gans, Gary (Technical Monitor)

    2004-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  12. U.S. FMS (Foreign Military Sales) and ROK (Republic of Korea) Economic Acquisition of Weapon Systems.

    DTIC Science & Technology

    1987-06-01

    of Defense sells military equipment and services to foreign governments and international organizations. DOD may order and buy ( procure ) the... procurement , the U.S. government agency or military department assigned cognizance for this "case" is authorized to enter into a subsequent contractional...the item but are handled in the same way as regular U.S. government procurement , with program directors and systems managers as needed dealing with the

  13. Monitoring What Governments “Give for” and “Spend on” Vaccine Procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline

    PubMed Central

    Nelson, E. A. S.; Bloom, David E.; Mahoney, Richard T.

    2014-01-01

    Background The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments – both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. Objective To determine realistic targets for VPA and VPB. Methods Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. Findings In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Conclusions Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs. PMID:24586899

  14. Monitoring what governments "give for" and "spend on" vaccine procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline.

    PubMed

    Nelson, E A S; Bloom, David E; Mahoney, Richard T

    2014-01-01

    The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. To determine realistic targets for VPA and VPB. Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs.

  15. 41 CFR 101-26.607-2 - Adjustments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Adjustments. 101-26.607-2 Section 101-26.607-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM...

  16. 41 CFR 101-26.501-8 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true [Reserved] 101-26.501-8 Section 101-26.501-8 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM...

  17. 41 CFR 101-26.506-2 - Limitations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Limitations. 101-26.506-2 Section 101-26.506-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM...

  18. 41 CFR 101-26.504 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true [Reserved] 101-26.504 Section 101-26.504 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA...

  19. 41 CFR 101-26.607-1 - Payments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Payments. 101-26.607-1 Section 101-26.607-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM...

  20. 41 CFR 101-26.601 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true [Reserved] 101-26.601 Section 101-26.601 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.6...

  1. 41 CFR 101-26.301 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Applicability. 101-26.301 Section 101-26.301 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3...

  2. 76 FR 8720 - Notice of Proposed Solicitation for Cooperative Agreement Applications (SCAA)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... Procurement Technical Assistance Program (PTAP) by awarding cost sharing cooperative agreements to assist eligible entities in establishing or maintaining procurement technical assistance centers (PTACs) pursuant... available for distribution. Written comments regarding this proposed SCAA may be submitted via mail to...

  3. 75 FR 24663 - Notice of Proposed Solicitation for Cooperative Agreement Applications (SCAA)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... Procurement Technical Assistance Program (PTAP) by awarding cost sharing cooperative agreements to assist eligible entities in establishing or maintaining procurement technical assistance centers (PTACs) pursuant... recipients'' at the bottom of the page). Printed copies are not available for distribution. Written comments...

  4. 41 CFR 101-26.301 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Applicability. 101-26.301 Section 101-26.301 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3...

  5. Sustainable Procurement: Integrating Classroom Learning with University Sustainability Programs

    ERIC Educational Resources Information Center

    Goldschmidt, Kyle; Harrison, Terry; Holtry, Matthew; Reeh, Jeremy

    2013-01-01

    Organizations are facing increased pressure from various stakeholders to address issues of sustainability, resulting in a growing demand for sustainability education and training. Procurement groups remain the key drivers of many sustainability-related strategies, placing pressure on universities to integrate sustainability concepts into the…

  6. 14 CFR 152.119 - Contract requirements and procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Contract requirements and procurement standards. 152.119 Section 152.119 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152...

  7. 7 CFR 226.22 - Procurement standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... which offerors must fulfill and all other factors to be used in evaluating bids or proposals. (2) Awards... purchase procedures are those relatively simple and informal procurement methods that are sound and... documented business reasons in the best interest of the Program. (3) In competitive negotiation, proposals...

  8. 7 CFR 226.22 - Procurement standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... which offerors must fulfill and all other factors to be used in evaluating bids or proposals. (2) Awards... purchase procedures are those relatively simple and informal procurement methods that are sound and... documented business reasons in the best interest of the Program. (3) In competitive negotiation, proposals...

  9. 77 FR 1657 - Profit and Fee Under Federal Financial Assistance Awards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... of Procurement, Contract Management Division, Washington, DC 20546. Comments may also be submitted by..., Office of Procurement, Contract Management Division, Room 5J75; telephone: (202) 358-0799; email: todd... and Industry, Grant programs, Grants administration, Cooperative agreements, State and local...

  10. 41 CFR 101-26.802 - Exclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Exclusions. 101-26.802 Section 101-26.802 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.8...

  11. 41 CFR 101-26.802 - Exclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Exclusions. 101-26.802 Section 101-26.802 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.8...

  12. 48 CFR 22.1021 - Requests for hearing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Service Contract Act of 1965, as... services to be performed under the contract; (4) The status of the procurement and any estimated... length negotiations; (2) A statement regarding the status of the procurement and any estimated...

  13. An interactive computer approach to performing resource analysis for a multi-resource/multi-project problem. [Spacelab inventory procurement planning

    NASA Technical Reports Server (NTRS)

    Schlagheck, R. A.

    1977-01-01

    New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.

  14. The impact of e-Procurement practice in Indonesia government: A Preliminary Study (The case of Electronic Procurement Service at Bekasi District)

    NASA Astrophysics Data System (ADS)

    Candra, S.; E Gunawan, F.

    2017-01-01

    In digital economy, government of Indonesia uses the internet to deliver services and to communicate with citizens and organizations. One of applications are e-Procurement and LPSE is a unit to hold the service system of e-Procurement. Procurement of goods and services electronically in addition will increase transparency and accountability, improve market access and healthy competition, as well as improving the efficiency of the procurement process. Based on the background and specific objectives to be achieved, then the research will be viewed from e-Marketplace participation, Trust and its impact on the performance of existing procurement within the institution. Methods of data analysis used in this research is by using analysis of Structural Equation Modelling (SEM) by using the program Partial Least Square (PLS) to examine the relationship between variables. The population used in this study is an enterprise as well as other clients using the system LPSE Bekasi District. There are three part in this study population, namely the provision of a company, customer, and supplier of LPSE users amounted to 60 users. From data analysis, there are one hypothesis that rejected. The implication of this study are implementation of e-procurement and e-marketplace participation giving impact to procurement performance.

  15. University Program Management Information System: NASA's University Program Active Projects

    NASA Technical Reports Server (NTRS)

    Gans, Gary (Technical Monitor)

    2003-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Office of Education/N.

  16. 25 CFR 273.53 - Applicable procurement regulations.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Applicable procurement regulations. 273.53 Section 273.53 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT General Contract Requirements § 273.53...

  17. 25 CFR 273.53 - Applicable procurement regulations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Applicable procurement regulations. 273.53 Section 273.53 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT General Contract Requirements § 273.53...

  18. 25 CFR 273.53 - Applicable procurement regulations.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Applicable procurement regulations. 273.53 Section 273.53 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT General Contract Requirements § 273.53...

  19. 25 CFR 273.53 - Applicable procurement regulations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Applicable procurement regulations. 273.53 Section 273.53 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT General Contract Requirements § 273.53...

  20. 25 CFR 273.53 - Applicable procurement regulations.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Applicable procurement regulations. 273.53 Section 273.53 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT General Contract Requirements § 273.53...

  1. 77 FR 23631 - Defense Federal Acquisition Regulation Supplement; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ..., 217, 242, 245, and 252 Government procurement. Mary Overstreet, Editor, Defense Acquisition... ``Deputy Assistant Secretary of the Army (Procurement)'' in alphabetical order; 0 b. In the Army list by... purchase, travel, and fuel card programs is available in the ``Department of Defense Government Charge Card...

  2. 20 CFR 638.806 - Property management and procurement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Section 638.806 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.806 Property management and procurement. The Job Corps Director shall develop procedures to establish and maintain a...

  3. 77 FR 33269 - Designation of Product Categories for Federal Procurement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... under such a contract.'' Thus, Federal contractors, as well as Federal agencies, are expressly subject... generally to procure such a product composed of the highest percentage of recovered materials content... those product categories that contain the highest biobased content. In addition, as the program matures...

  4. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2005-05-31

    building a new amphibious assault ship called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned ...but the FY2006-FY2011 Future Years Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007...Three developments have caused the Navy to reconsider its plans for procuring amphibious ships, maritime prepositioning ships, and connector ships

  5. Department of the Army Justification of Estimates for Fiscal Year 1983 Submitted to Congress February 1982. Part 2 (Missiles).

    DTIC Science & Technology

    1982-02-01

    STINGER missiles and ground support equipment. The program for FY 1983 represents the sixth year of a planned eleven-year procurement effort designed ...planned eleven year procurement effort designed t., fill the Army’s inventory objective. The STINER, scheduled to replace the obsolete RED-YI, has greater...equipment. This is the fifth year of procurement designed to fill the Army inventory objective. MIRES is a self-propelled, fast- reacting, multiple rocket

  6. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Approved aircraft inspection program. 135...

  7. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Approved aircraft inspection program. 135...

  8. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Approved aircraft inspection program. 135...

  9. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Approved aircraft inspection program. 135...

  10. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Approved aircraft inspection program. 135...

  11. Review of V/STOL lift/cruise fan technology

    NASA Technical Reports Server (NTRS)

    Rolls, L. S.; Quigley, H. C.; Perkins, R. G., Jr.

    1976-01-01

    This paper presents an overview of supporting technology programs conducted to reduce the risk in the joint NASA/Navy Lift/Cruise Fan Research and Technology Aircraft Program. The aeronautical community has endeavored to combine the low-speed and lifting capabilities of the helicopter with the high-speed capabilities of the jet aircraft; recent developments have indicated a lift/cruise fan propulsion system may provide these desired characteristics. NASA and the Navy have formulated a program that will provide a research and technology aircraft to furnish viability of the lift/cruise fan aircraft through flight experiences and obtain data on designs for future naval and civil V/STOL aircraft. The supporting technology programs discussed include: (1) design studies for operational aircraft, a research and technology aircraft, and associated propulsion systems; (2) wind-tunnel tests of several configurations; (3) propulsion-system thrust vectoring tests; and (4) simulation. These supporting technology programs have indicated that a satisfactory research and technology aircraft program can be accomplished within the current level of technology.

  12. Status report on the land processes aircraft science management operations working group

    NASA Technical Reports Server (NTRS)

    Lawless, James G.; Mann, Lisa J.

    1991-01-01

    Since its inception three years ago, the Land Processes Aircraft Science Management Operations Working Group (MOWG) provided recommendations on the optimal use of the Agency's aircraft in support of the Land Processes Science Program. Recommendations covered topics such as aircraft and sensor usage, development of long-range plans, Multisensor Airborne Campaigns (MAC), program balance, aircraft sensor databases, new technology and sensor development, and increased University scientist participation in the program. Impacts of these recommendations improved the efficiency of various procedures including the flight request process, tracking of flight hours, and aircraft usage. The group also created a bibliography focused on publications produced by Land Processes scientists from the use of the aircraft program, surveyed NASA funded PI's on their participation in the aircraft program, and developed a planning template for multi-sensor airborne campaigns. Benefits from these activities are summarized.

  13. Improvements Needed on DoD Procurements from Robertson Fuel Systems (REDACTED)

    DTIC Science & Technology

    2015-06-25

    reasonable price, but is not certified. 4 A ballistically self-sealing tank is designed to prevent fuel loss and a fire after damage. FOR OFFICIAL USE ONLY...pubs/index.cfm. DoD IG DODIG-2015-120, “Defense Logistics Agency Did Not Obtain Fair and Reasonable Prices from Meggitt Aircraft Braking System for...Mobility Multipurpose Wheeled Vehicle Repair Parts,” April 4, 2014 DODIG-2014-020, “U.S. Army Contracting Command Did Not Obtain Fair and Reasonable

  14. Joint Service Aircrew Mask (JSAM) - Tactical Aircraft (TA) Modified A/P22P-14A (V)3: Noise Attenuation and Speech Intelligibility Performance

    DTIC Science & Technology

    2015-07-01

    PAGE Using Government drawings, specifications, or other data included in this document for any purpose other than Government procurement does...not in any way obligate the U.S. Government. The fact that the Government formulated or supplied the drawings, specifications, or other data does...this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data

  15. Changing the Introduction to Fighter Fundamentals Course for 21st Century F-15C Pilots

    DTIC Science & Technology

    2016-01-01

    IFF model based on the success the USAF has enjoyed in establishing Air Superiority. There is no argument the United States has enjoyed the blanket ...dangerous place and so is the air superiority domain. Our country has gone to great lengths procuring new advanced weapons such as the F-22A and...F-35A, meanwhile updating older aircraft with advanced technology to ensure air dominance.9 So have her near peer adversaries, such as Russia and

  16. Operation CHROMITE (INCHON), Offensive, Amphibious Assault, Joint, 15 September 1950

    DTIC Science & Technology

    1984-05-23

    veterans and supported by over 210 [103 pI combat aircraft. (O’Ballance, p. 25) So this was the military system that procured the North Korean military...one; and, the commander then decides which course to adopt. INCHON was a product of MacArthur’s strategic vision. To K make that vision a reality he... systems radiate from Seoul to the east, north, and south. A force which controls Seoul controls the transportation arteries. (X Corps, p. 5) Seoul

  17. 41 CFR 101-26.000 - Scope of part.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope of part. 101-26.000 Section 101-26.000 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM § 101-26...

  18. 41 CFR 109-26.501-50 - Authority and allocations for the acquisition of passenger motor vehicles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Authority and...

  19. 48 CFR 606.370 - Department of State standardization program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 606.370... competition in all procurement actions. The authority at 41 U.S.C. 253(c)(1) shall be used with respect to... activity competition advocate, and the Procurement Executive shall approve all Justifications for Other...

  20. 48 CFR 606.370 - Department of State standardization program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 606.370... competition in all procurement actions. The authority at 41 U.S.C. 253(c)(1) shall be used with respect to... activity competition advocate, and the Procurement Executive shall approve all Justifications for Other...

  1. 7 CFR 226.21 - Food service management companies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... procurements of meals from food service management companies shall adhere to the procurement standards set... provisions set forth in § 226.22, the State agency may mandate that each institution with Program meal... shall include the time and place of the bid opening; (2) The institution shall notify the State agency...

  2. 78 FR 45182 - Clarification of Sourcing Requirements for the Procurement List

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ...) 4140.1-R, DoD Supply Chain Materiel Management Regulation, the AbilityOne Program is designating the... Defense and the General Services Administration Governing Supply Management Relationships Under the National Supply System provides DLA the authority to procure and supply certain assigned products for the...

  3. 41 CFR 101-26.200 - Scope of subpart.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Scope of subpart. 101-26... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.2-Federal Requisitioning System § 101-26.200 Scope of subpart. This subpart prescribes a...

  4. 41 CFR 101-26.200 - Scope of subpart.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Scope of subpart. 101-26... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.2-Federal Requisitioning System § 101-26.200 Scope of subpart. This subpart prescribes a...

  5. 41 CFR 101-26.200 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope of subpart. 101-26... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.2-Federal Requisitioning System § 101-26.200 Scope of subpart. This subpart prescribes a...

  6. 41 CFR 101-26.200 - Scope of subpart.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Scope of subpart. 101-26... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.2-Federal Requisitioning System § 101-26.200 Scope of subpart. This subpart prescribes a...

  7. 48 CFR 1403.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... a particular procurement: (1) Individuals who generate contract requirements, including program and... the contracting activity directly involved in the procurement; (4) Supervisors in the CO's chain of... ethics official and servicing Ethics Counselors; (17) Members of Congress and members of their staff...

  8. 13 CFR 124.503 - How does SBA accept a procurement for award through the 8(a) BD program?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... take SDB or small business credit for an order where the concern has been asked by the procuring agency to recertify its size, 8(a) or SDB status and is unable to do so (see § 121.404(g)), or where...

  9. Selection and procurement of commercial parts for microsat product line

    NASA Astrophysics Data System (ADS)

    Lay, P.; Cavalin, O.; Chaminade, C.; Mouton, A.

    2002-12-01

    For the microsatellite product line named Myriade using, on a large scale, commercial parts, this paper presents the parts management strategy. The paper describes the adapted methodology with respect to the program risk/cost ratio and identifies the lessons learned from the selection and procurement process.

  10. 48 CFR 225.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 225.403 Section 225.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements...

  11. 77 FR 25632 - Guidelines for Designating Biobased Products for Federal Procurement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    ... guidelines will not affect products that have already been designated for Federal procurement preference. Any... technological limitations. USDA recognizes that, in general, the Federal government does not purchase large... decision to clarify the terminology used in the BioPreferred program by avoiding, to the extent possible...

  12. 77 FR 74164 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... represent accurately whether they do or do not have any qualifying convictions or tax delinquencies which...-procurement program whether they have any felony convictions or tax delinquencies that would prevent USDA or...-procurement transactions do not have any felony convictions or tax delinquencies. The AD 3030/3030-FS are...

  13. 48 CFR 225.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 225.403 Section 225.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements...

  14. 48 CFR 225.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 225.403 Section 225.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements...

  15. 48 CFR 225.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 225.403 Section 225.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements...

  16. 48 CFR 225.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 225.403 Section 225.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements...

  17. Standard spacecraft economic analysis. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Harris, E. D.; Large, J. P.

    1976-01-01

    A study of the comparative program costs associated with use of various standardized spacecraft for Air Force space test program missions to be flown on the space shuttle during the 1980-1990 time period is reviewed. The first phase of the study considered a variety of procurement mixes composed of existing or programmed NASA standard spacecraft designs and a Air Force standard spacecraft design. The results were briefed to a joint NASA/Air Force audience on July 11, 1976. The second phase considered additional procurement options using an upgraded version of an existing NASA design. The results of both phases are summarized.

  18. Summary of development and recommendations for a quality assurance program for the procurement and manufacture of urban mass transit operating equipment and systems

    NASA Technical Reports Server (NTRS)

    Witkin, S. A.

    1976-01-01

    A viable quality program for the urban mass transit industry, and a management approach to ensure compliance with the program are outlined. Included are: (1) a set of guidelines for quality assurance to be imposed on transit authorities, and a management approach to ensure compliance with them; (2) a management approach to be used by the transit authorities (properties) for assuring compliance with the QA guidelines; and (3) quality assurance guidelines to be imposed by properties and umta for procurement of hardware and systems.

  19. Improvements to the adaptive maneuvering logic program

    NASA Technical Reports Server (NTRS)

    Burgin, George H.

    1986-01-01

    The Adaptive Maneuvering Logic (AML) computer program simulates close-in, one-on-one air-to-air combat between two fighter aircraft. Three important improvements are described. First, the previously available versions of AML were examined for their suitability as a baseline program. The selected program was then revised to eliminate some programming bugs which were uncovered over the years. A listing of this baseline program is included. Second, the equations governing the motion of the aircraft were completely revised. This resulted in a model with substantially higher fidelity than the original equations of motion provided. It also completely eliminated the over-the-top problem, which occurred in the older versions when the AML-driven aircraft attempted a vertical or near vertical loop. Third, the requirements for a versatile generic, yet realistic, aircraft model were studied and implemented in the program. The report contains detailed tables which make the generic aircraft to be either a modern, high performance aircraft, an older high performance aircraft, or a previous generation jet fighter.

  20. Update of aircraft profile data for the Integrated Noise Model computer program, vol. 3 : appendix B aircraft performance coefficients

    DOT National Transportation Integrated Search

    1992-03-01

    This report provides aircraft takeoff and landing profiles, : aircraft aerodynamic performance coefficients and engine : performance coefficients for the aircraft data base : (Database 9) in the Integrated Noise Model (INM) computer : program. Flight...

  1. Report to the President and the Secretary of Defense on the Department of Defense by the Blue Ribbon Defense Panel

    DTIC Science & Technology

    1970-07-01

    scientific and industrial community. (3) The Defense procurement policies and practices, par•icularly as they relate to costs , time and quality. (4) Such...procurements. Military hardware development programs continue to be plagued by the now familiar symptoms of trouble: (I ) Major cost growths or overruns...and this uncertainty makes it inevitable that some degree of cost growth, delays and short-falls in desired perfornmance will occur in sonme programs

  2. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2007-06-12

    up Northrop Grumman Ship Systems ( NGSS ). Table 2. FY2008-FY2013 Amphibious and MPF(F) Ship Procurement Plan (Ships fully funded in FY2006 shown for... Plan . . 13 Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress Introduction The...is whether to approve, modify, or reject the Navy’s plans for procuring amphibious and MPF(F) ships. Decisions that Congress makes on this CRS-2 1 The

  3. Advanced turboprop testbed systems study. Volume 1: Testbed program objectives and priorities, drive system and aircraft design studies, evaluation and recommendations and wind tunnel test plans

    NASA Technical Reports Server (NTRS)

    Bradley, E. S.; Little, B. H.; Warnock, W.; Jenness, C. M.; Wilson, J. M.; Powell, C. W.; Shoaf, L.

    1982-01-01

    The establishment of propfan technology readiness was determined and candidate drive systems for propfan application were identified. Candidate testbed aircraft were investigated for testbed aircraft suitability and four aircraft selected as possible propfan testbed vehicles. An evaluation of the four candidates was performed and the Boeing KC-135A and the Gulfstream American Gulfstream II recommended as the most suitable aircraft for test application. Conceptual designs of the two recommended aircraft were performed and cost and schedule data for the entire testbed program were generated. The program total cost was estimated and a wind tunnel program cost and schedule is generated in support of the testbed program.

  4. University Program Management Information System

    NASA Technical Reports Server (NTRS)

    Gans, Gary (Technical Monitor)

    2002-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Education Division/FE, Office of Human Resources and Education.

  5. Technical and Economic Aspects of Designing an Efficient Room Air-Conditioner Program in India

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abhyankar, Nikit; Shah, Nihar; Phadke, Amol

    Several studies have projected a massive increase in the demand for air conditioners (ACs) over the next two decades in India. By 2030, room ACs could add 140 GW to the peak load, equivalent to over 30% of the total projected peak load. Therefore, there is significant interest among policymakers, regulators, and utilities in managing room AC demand by enhancing energy efficiency. Building on the historical success of the Indian Bureau of Energy Efficiency’s star-labeling program, Energy Efficiency Services Limited recently announced a program to accelerate the sale of efficient room ACs using bulk procurement, similar to their successful UJALAmore » light-emitting diode (LED) bulk procurement program. This report discusses some of the key considerations in designing a bulk procurement or financial incentive program for enhancing room AC efficiency in India. We draw upon our previous research to demonstrate the overall technical potential and price impact of room AC efficiency improvement and its technical feasibility in India. We also discuss the importance of using low global warming potential (GWP) refrigerants and smart AC equipment that is demand response (DR) ready.« less

  6. Conceptual Design Optimization of an Augmented Stability Aircraft Incorporating Dynamic Response and Actuator Constraints

    NASA Technical Reports Server (NTRS)

    Welstead, Jason; Crouse, Gilbert L., Jr.

    2014-01-01

    Empirical sizing guidelines such as tail volume coefficients have long been used in the early aircraft design phases for sizing stabilizers, resulting in conservatively stable aircraft. While successful, this results in increased empty weight, reduced performance, and greater procurement and operational cost relative to an aircraft with optimally sized surfaces. Including flight dynamics in the conceptual design process allows the design to move away from empirical methods while implementing modern control techniques. A challenge of flight dynamics and control is the numerous design variables, which are changing fluidly throughout the conceptual design process, required to evaluate the system response to some disturbance. This research focuses on addressing that challenge not by implementing higher order tools, such as computational fluid dynamics, but instead by linking the lower order tools typically used within the conceptual design process so each discipline feeds into the other. In thisresearch, flight dynamics and control was incorporated into the conceptual design process along with the traditional disciplines of vehicle sizing, weight estimation, aerodynamics, and performance. For the controller, a linear quadratic regulator structure with constant gains has been specified to reduce the user input. Coupling all the disciplines in the conceptual design phase allows the aircraft designer to explore larger design spaces where stabilizers are sized according to dynamic response constraints rather than historical static margin and volume coefficient guidelines.

  7. Update of aircraft profile data for the Integrated Noise Model computer program, vol. 2 : appendix A aircraft takeoff and landing profiles

    DOT National Transportation Integrated Search

    1992-03-01

    This report provides aircraft takeoff and landing profiles, aircraft aerodynamic performance coefficients and engine performance coefficients for the aircraft data base (Database 9) in the Integrated Noise Model (INM) computer program. Flight profile...

  8. M2-F1 in flight

    NASA Technical Reports Server (NTRS)

    1964-01-01

    The M2-F1 Lifting Body is seen here under tow by an unseen C-47 at the NASA Flight Research Center (later redesignated the Dryden Flight Research Center), Edwards, California. The low-cost vehicle was the first piloted lifting body to be test flown. The lifting-body concept originated in the mid-1950s at the National Advisory Committee for Aeronautics' Ames Aeronautical Laboratory, Mountain View California. By February 1962, a series of possible shapes had been developed, and R. Dale Reed was working to gain support for a research vehicle. The wingless, lifting body aircraft design was initially concieved as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. These initial tests produced enough flight data about the M2-F1 to proceed with flights behind a NASA C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting-body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight research vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  9. M2-F1 in flight

    NASA Technical Reports Server (NTRS)

    1965-01-01

    The M2-F1 Lifting Body is seen here under tow, high above Rogers Dry Lake near the Flight Research Center (later redesignated the Dryden Flight Research Center), Edwards, California. R. Dale Reed effectively advocated the project with the support of NASA research pilot Milt Thompson. Together, they gained the support of Flight Research Center Director Paul Bikle. After a six-month feasibility study, Bikle gave approval in the fall of 1962 for the M2-F1 to be built. The wingless, lifting body aircraft design was initially concieved as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Flight Research Center management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. These initial tests produced enough flight data about the M2-F1 to proceed with flights behind a NASA C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight research vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  10. 48 CFR 25.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 25.403 Section 25.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements 25.403 World Trade Organization...

  11. Secretary | Center for Cancer Research

    Cancer.gov

    We are looking for a pleasant, organized, dependable person to serve as a full-time secretary in the Basic Science Program (BSP) at the Frederick National Laboratory for Cancer Research (FNCLR).  The BSP provides procurement and logistical support to the laboratories of the Center for Cancer Research.  Tasks include high volume procurement (blanket orders, purchase requests,

  12. 48 CFR 25.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 25.403 Section 25.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements 25.403 World Trade Organization...

  13. 48 CFR 25.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 25.403 Section 25.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements 25.403 World Trade Organization...

  14. 48 CFR 25.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 25.403 Section 25.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements 25.403 World Trade Organization...

  15. 48 CFR 25.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 25.403 Section 25.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements 25.403 World Trade Organization...

  16. 41 CFR 101-26.803-3 - Reporting of discrepancies in transportation, shipments, material, or billings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... discrepancies in transportation, shipments, material, or billings. 101-26.803-3 Section 101-26.803-3 Public... REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.8-Discrepancies or Deficiencies in GSA or DOD Shipments, Material, or Billings § 101-26.803-3 Reporting of discrepancies in...

  17. 48 CFR 2801.603-1 - Department of Justice Acquisition Career Management Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... employee's skill level to an appropriate level in each area of competence necessary to perform his or her... an appropriate level of skill in all necessary competencies in the field of procurement. In general, a proficiency skill level of 3, as defined in Attachment 1 to Office of Federal Procurement Policy...

  18. 41 CFR 101-26.505 - Office and household furniture and furnishings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Office and household furniture and furnishings. 101-26.505 Section 101-26.505 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA...

  19. Review of TESS internal controls over financial management and procurement activities. [TRW Environmental Safety Syatems (TESS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-11-25

    The Department of Energy's (DOE) civilian radioactive waste program is responsible for the safe disposal of highly radioactive nuclear waste. In February 1991, TRW Environmental Safety Systems (TESS) became the Management and operating contractor for this program. The value of the TESS contract was placed at $1 billion over a 10-year period. In October 1991, we made a review of financial controls in place at TESS. This audit was limited to an evaluation of the internal controls for financial management and procurement. We found that although TESS had made progress in establishing the necessary financial management structure, more effective controlsmore » were needed in certain areas. Specifically, TESS used a method for computing business license taxes that resulted in overpayment; they put into effect a policy to reimburse employees the maximum allowable rate for lodging rather than the actual costs; they did not always obtain the most economical airfares for travel; and, they did not utilize the most effective procurement methods. The Headquarters Procurement Office agreed with our findings and developed an action plan which addresses our recommendations.« less

  20. Review of TESS internal controls over financial management and procurement activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-11-25

    The Department of Energy`s (DOE) civilian radioactive waste program is responsible for the safe disposal of highly radioactive nuclear waste. In February 1991, TRW Environmental Safety Systems (TESS) became the Management and operating contractor for this program. The value of the TESS contract was placed at $1 billion over a 10-year period. In October 1991, we made a review of financial controls in place at TESS. This audit was limited to an evaluation of the internal controls for financial management and procurement. We found that although TESS had made progress in establishing the necessary financial management structure, more effective controlsmore » were needed in certain areas. Specifically, TESS used a method for computing business license taxes that resulted in overpayment; they put into effect a policy to reimburse employees the maximum allowable rate for lodging rather than the actual costs; they did not always obtain the most economical airfares for travel; and, they did not utilize the most effective procurement methods. The Headquarters Procurement Office agreed with our findings and developed an action plan which addresses our recommendations.« less

  1. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2005-08-02

    called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned , but the FY2006-FY2011 Future Years...Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007. The FY2006-FY2011 FYDP also calls...developments have caused the Navy to reconsider its plans for procuring amphibious ships and maritime prepositioning ships. One is a new concept of operations

  2. Challenges for the aircraft structural integrity program

    NASA Technical Reports Server (NTRS)

    Lincoln, John W.

    1994-01-01

    Thirty-six years ago the United States Air Force established the USAF Aircraft Structural Integrity Program (ASIP) because flight safety had been degraded by fatigue failures of operational aircraft. This initial program evolved, but has been stable since the issuance of MIL-STD-1530A in 1975. Today, the program faces new challenges because of a need to maintain aircraft longer in an environment of reduced funding levels. Also, there is increased pressure to reduce cost of the acquisition of new aircraft. It is the purpose of this paper to discuss the challenges for the ASIP and identify the changes in the program that will meet these challenges in the future.

  3. Vehicle Design Evaluation Program (VDEP). A computer program for weight sizing, economic, performance and mission analysis of fuel-conservative aircraft, multibodied aircraft and large cargo aircraft using both JP and alternative fuels

    NASA Technical Reports Server (NTRS)

    Oman, B. H.

    1977-01-01

    The NASA Langley Research Center vehicle design evaluation program (VDEP-2) was expanded by (1) incorporating into the program a capability to conduct preliminary design studies on subsonic commercial transport type aircraft using both JP and such alternate fuels as hydrogen and methane;(2) incorporating an aircraft detailed mission and performance analysis capability; and (3) developing and incorporating an external loads analysis capability. The resulting computer program (VDEP-3) provides a preliminary design tool that enables the user to perform integrated sizing, structural analysis, and cost studies on subsonic commercial transport aircraft. Both versions of the VDEP-3 Program which are designated preliminary Analysis VDEP-3 and detailed Analysis VDEP utilize the same vehicle sizing subprogram which includes a detailed mission analysis capability, as well as a geometry and weight analysis for multibodied configurations.

  4. 78 FR 12259 - Unmanned Aircraft System Test Site Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ...-0061] Unmanned Aircraft System Test Site Program AGENCY: Federal Aviation Administration (FAA), DOT... Defense, develop a test site program for the integration of unmanned aircraft systems in to the National Airspace System. The overall purpose of this test site program is to develop a body of data and operational...

  5. Design and Development of the Aircraft Instrument Comprehension Program.

    ERIC Educational Resources Information Center

    Higgins, Norman C.

    The Aircraft Instrument Comprehension (AIC) Program is a self-instructional program designed to teach undergraduate student pilots to read instruments that indicate the position of the aircraft in flight, based on sequential instructional stages of information, prompted practice, and unprompted practice. The program includes a 36-item multiple…

  6. Quiet powered-lift propulsion

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Latest results of programs exploring new propulsion technology for powered-lift aircraft systems are presented. Topics discussed include results from the 'quiet clean short-haul experimental engine' program and progress reports on the 'quiet short-haul research aircraft' and 'tilt-rotor research aircraft' programs. In addition to these NASA programs, the Air Force AMST YC 14 and YC 15 programs were reviewed.

  7. The global, centralized approach of the GAIN Premix Facility has made oil fortification in Indonesia more affordable.

    PubMed

    Jallier, Vincent; Guyondet, Christophe; Provent, Adeline; Laillou, Arnaud; Soekirman; Moench-Pfanner, Regina

    2013-06-01

    Access to high-grade micronutrients is a recurring challenge that often threatens the long-term sustainability of food fortification programs. To assess the efficiency of the Global Alliance for Improved Nutrition (GAIN) Premix Facility in procuring quality, affordable vitamin A for fortification of edible oil in Indonesia. A global approach to procurement of standard items was used by combining volumes across various demand streams in order to reduce the total cost of acquisition through economies of scale. The GAIN Premix Facility undertook a detailed analysis of vitamin A requirements across its existing customer base, which served as a basis for developing a reliable demand forecast. A consolidated, competitive tender was launched that resulted in the setting up of a long-term commercial agreement with the selected supplier to lock in the most competitive price for a given period of time. The direct benefit to oil manufacturers of fortifying with vitamin A is that the cost of fortification went down significantly compared with prices they would have been offered had they ordered vitamin A individually. In Indonesia, this consolidated procurement approach has allowed a 14.5% decrease in the unit price of vitamin A. The GAIN Premix Facility demonstrated its effectiveness in acting as a global procurement platform by aggregating demand across different customers and leveraging improved prices through increased volumes. Building on the success of this effort, the GAIN Premix Facility is replicating this global approach for procurement of other standard items being procured across fortification programs worldwide.

  8. Administrative Preparedness Strategies: Expediting Procurement and Contracting Cycle Times During an Emergency.

    PubMed

    Hurst, David; Sharpe, Sharon; Yeager, Valerie A

    We assessed whether administrative preparedness processes that were intended to expedite the acquisition of goods and services during a public health emergency affect estimated procurement and contracting cycle times. We obtained data from 2014-2015 applications to the Hospital Preparedness Program and Public Health Emergency Preparedness (HPP-PHEP) cooperative agreements. We compared the estimated procurement and contracting cycle times of 61 HPP-PHEP awardees that did and did not have certain administrative processes in place. Certain processes, such as statutes allowing for procuring and contracting on the open market, had an effect on reducing the estimated cycle times for obtaining goods and services. Other processes, such as cooperative purchasing agreements, also had an effect on estimated procurement time. For example, awardees with statutes that permitted them to obtain goods and services in the open market had an average procurement cycle time of 6 days; those without such statutes had a cycle time of 17 days ( P = .04). PHEP awardees should consider adopting these or similar processes in an effort to reduce cycle times.

  9. Update of aircraft profile data for the Integrated Noise Model computer program, vol 1: final report

    DOT National Transportation Integrated Search

    1992-03-01

    This report provides aircraft takeoff and landing profiles, aircraft aerodynamic performance coefficients and engine performance coefficients for the aircraft data base (Database 9) in the Integrated Noise Model (INM) computer program. Flight profile...

  10. QA program plan plutonium stabilization and handling project W-460

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, J.W.

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

  11. Design definition study of NASA/Navy lift/cruise fan V/STOL aircraft

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Assessed are the risks associated with the lift/cruise fan technology V/STOL aircraft program. Three candidate concepts for the technology aircraft design approach are considered: the lowspeed only modification, the full performance modification, and the all new aircraft concepts. Survey results indicate that the lift/cruise fan technology aircraft program is feasible, from the standpoint of technical risk, with some evidence of uncertainty of meeting the planned schedule and relatively minor impact on estimated program costs.

  12. VASCOMP 2. The V/STOL aircraft sizing and performance computer program. Volume 6: User's manual, revision 3

    NASA Technical Reports Server (NTRS)

    Schoen, A. H.; Rosenstein, H.; Stanzione, K.; Wisniewski, J. S.

    1980-01-01

    This report describes the use of the V/STOL Aircraft Sizing and Performance Computer Program (VASCOMP II). The program is useful in performing aircraft parametric studies in a quick and cost efficient manner. Problem formulation and data development were performed by the Boeing Vertol Company and reflects the present preliminary design technology. The computer program, written in FORTRAN IV, has a broad range of input parameters, to enable investigation of a wide variety of aircraft. User oriented features of the program include minimized input requirements, diagnostic capabilities, and various options for program flexibility.

  13. Coast Guard Cutter Procurement: Background and Issues for Congress

    DTIC Science & Technology

    2015-07-28

    Research Service Summary The Coast Guard’s program of record (POR) calls for procuring 8 National Security Cutters (NSCs), 25 Offshore Patrol Cutters...3 Figure 2. Offshore Patrol Cutter (Generic Conceptual... Offshore Patrol Cutters (OPCs), and 58 Fast Response Cutters (FRCs). These 91 planned cutters are intended as replacements for 90 aging Coast Guard cutters

  14. Materiel Acquisition Management Guide

    DTIC Science & Technology

    1980-02-11

    Ii-n manager and his staff, hiqhlighted by the specific de - tails provided in tabbea one-sheet descriptions. • Part III - Areas of Aco-uisition...support program requirements? Support and Test Equipment (S/TE)? Spares Support (SS)? Storage and transportation ? training? o Have test and...PACKAGES PROCUREMENT PLANNING/ PROCUREMENT pLANS TEST AND EVALUATION - PLANNING PRODUCIBILITY ENGINEERING AND TRAINING PLANNING (PEP) TRANSPORTABILITY

  15. 41 CFR 101-26.309 - Cancellation of orders for GSA stock items.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Cancellation of orders for GSA stock items. 101-26.309 Section 101-26.309 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3...

  16. 48 CFR 470.202 - Acquisition of commodities for United States Agency for International Development (USAID) programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... to foreign destinations and related freight to transport such commodities under Title II of Public... respect to a commodity procurement or a freight procurement will specify that in the event an offer... offer if the acceptance of another offer for the commodity or freight, when combined with other offers...

  17. 48 CFR 470.202 - Acquisition of commodities for United States Agency for International Development (USAID) programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... to foreign destinations and related freight to transport such commodities under Title II of Public... respect to a commodity procurement or a freight procurement will specify that in the event an offer... offer if the acceptance of another offer for the commodity or freight, when combined with other offers...

  18. 48 CFR 470.202 - Acquisition of commodities for United States Agency for International Development (USAID) programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to foreign destinations and related freight to transport such commodities under Title II of Public... respect to a commodity procurement or a freight procurement will specify that in the event an offer... offer if the acceptance of another offer for the commodity or freight, when combined with other offers...

  19. 48 CFR 470.202 - Acquisition of commodities for United States Agency for International Development (USAID) programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... to foreign destinations and related freight to transport such commodities under Title II of Public... respect to a commodity procurement or a freight procurement will specify that in the event an offer... offer if the acceptance of another offer for the commodity or freight, when combined with other offers...

  20. 13 CFR 124.503 - How does SBA accept a procurement for award through the 8(a) BD program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... market research, the contracting officer shall first consider a set-aside or sole source award (if the... market research conducted. In addition, the contracting officer must document the contract file showing... factors such as the results of market research, programmatic needs specific to the procuring agency...

  1. 41 CFR 101-26.505-2 - Description of office and household furnishings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Description of office and household furnishings. 101-26.505-2 Section 101-26.505-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5...

  2. 41 CFR 101-26.505-1 - Description of office and household furniture.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Description of office and household furniture. 101-26.505-1 Section 101-26.505-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GS...

  3. 13 CFR 124.502 - How does an agency offer a procurement to SBA for award through the 8(a) BD program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Assistance SMALL BUSINESS ADMINISTRATION 8(a) BUSINESS DEVELOPMENT/SMALL DISADVANTAGED BUSINESS STATUS DETERMINATIONS 8(a) Business Development Contractual Assistance § 124.502 How does an agency offer a procurement... competitive 8(a) requirements and those sole source requirements for which no specific Participant is...

  4. 42 CFR 121.9 - Designated transplant program requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.9 Designated transplant program...) Has immediate access to microbiology, clinical chemistry, histocompatibility testing, radiology, and...

  5. 42 CFR 121.9 - Designated transplant program requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.9 Designated transplant program...) Has immediate access to microbiology, clinical chemistry, histocompatibility testing, radiology, and...

  6. 42 CFR 121.9 - Designated transplant program requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.9 Designated transplant program...) Has immediate access to microbiology, clinical chemistry, histocompatibility testing, radiology, and...

  7. 49 CFR 1544.205 - Acceptance and screening of cargo.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Preventing or deterring the carriage of any explosive or incendiary. Each aircraft operator operating under a... operator operating under a full program or a full all-cargo program, or a twelve-five program in an all... program, before loading it on its aircraft. (c) Control. Each aircraft operator operating under a full...

  8. The Path to Savings: Understanding the Federal Purchase of Energy-Consuming Products

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, Margaret; Fujita, K. Sydny

    Energy efficiency has been a federal procurement policy objective since at least 1992, with the origin of the Energy Efficient Product Procurement (EEPP) program within the larger Federal Energy Management Program (FEMP). Today, the EEPP program’s mandate is based on requirements that 95% of new contract actions, task orders, and delivery orders for products and services be energy and water efficient, as laid out in Executive Order 13514 in 2009. Facilitating full compliance with EO 13514 presents a significant strategic planning challenge to the FEMP EEPP program, given the size of the federal government, the range of missions of itsmore » many agencies, the mix of management approaches for its buildings, and the diverse set of roughly 80 energy efficient products which has been established through preceding legislation and executive orders. The goal of this report is to aid the program in prioritizing its resources by providing an overview of how the purchase of energy-consuming products occurs in today’s evolving federal procurement system, as well as identify likely intervention points and compliance review mechanisms. Through a synthesis of the literature on U.S. federal sector procurement and two dozen primary interviews, the report particularly focuses on the importance of price in determining the actor(s) responsible for any given purchase of an energy-consuming product. This identification is important, as the relevant actors are trained and reviewed in different ways that the FEMP EEPP program can prioritize for targeting, based on the decision criteria such as the potential energy savings associated with the actor’s purchases or the administrative ease of the intervention.« less

  9. 48 CFR 23.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES... meet the requirement that renewable agricultural materials or forestry materials in such product must...

  10. 48 CFR 23.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES... biobased product, except that the products need not meet the requirement that renewable agricultural...

  11. 48 CFR 23.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES... meet the requirement that renewable agricultural materials or forestry materials in such product must...

  12. Army Transportation Systems in a Twenty-First Century Joint Operational Environment

    DTIC Science & Technology

    2013-03-01

    182, C-20B, 0-2A, T-34, TG-14, U-21, UV-18, UV-20, UC -35, and T-6 fixed-wing aircraft. This fleet totals 2,799 airframes, distributed to all of the...Sealift Command ( MSC ) fielded the first of ten projected Joint High Speed Vessels (JHSV) in February 2013. The JHSV can move 600 tons over 1,200...110 14 Merchant Marine crewed ships under MSC control.36 This initiative prompted the Army to cancel its plan to procure seven JSHV on its own

  13. Quality assurance program guidelines for application to and use by manufacturers of rail/guideway vehicles, buses, automatic train control systems, and their major subsystems

    NASA Technical Reports Server (NTRS)

    Witkin, S. A.

    1976-01-01

    Guidelines are presented for a quality assurance system to be implemented by the manufacturer in support of designing, developing, fabricating, assembling, inspecting, testing, handling, and delivery of equipment being procured for use in public urban mass transit systems. The guidelines apply to this equipment when being procured for: (1) use in revenue service; (2) demonstration of systems that will be revenue producing or used by the public; (3) use as a prototype for follow-on operational/revenue producing equipment procurements; and (4) qualification tests.

  14. 14 CFR 119.49 - Contents of operations specifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... markings, and serial number of each aircraft that is subject to an airworthiness maintenance program..., and emergency equipment of aircraft that are subject to an airworthiness maintenance program required... Transportation, if required. (4) Type of aircraft, registration markings, and serial numbers of each aircraft...

  15. 14 CFR 119.49 - Contents of operations specifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... markings, and serial number of each aircraft that is subject to an airworthiness maintenance program..., and emergency equipment of aircraft that are subject to an airworthiness maintenance program required... Transportation, if required. (4) Type of aircraft, registration markings, and serial numbers of each aircraft...

  16. 14 CFR 119.49 - Contents of operations specifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... markings, and serial number of each aircraft that is subject to an airworthiness maintenance program..., and emergency equipment of aircraft that are subject to an airworthiness maintenance program required... Transportation, if required. (4) Type of aircraft, registration markings, and serial numbers of each aircraft...

  17. 14 CFR 119.49 - Contents of operations specifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... markings, and serial number of each aircraft that is subject to an airworthiness maintenance program..., and emergency equipment of aircraft that are subject to an airworthiness maintenance program required... Transportation, if required. (4) Type of aircraft, registration markings, and serial numbers of each aircraft...

  18. 41 CFR 101-26.506-1 - Types of service.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAM 26.5-GSA Procurement Programs § 101-26.506-1 Types of service. GSA interior planning and design...; softline space plans; development of an interior design program (to include finish materials, furniture and...

  19. Propeller aircraft interior noise model utilization study and validation

    NASA Technical Reports Server (NTRS)

    Pope, L. D.

    1984-01-01

    Utilization and validation of a computer program designed for aircraft interior noise prediction is considered. The program, entitled PAIN (an acronym for Propeller Aircraft Interior Noise), permits (in theory) predictions of sound levels inside propeller driven aircraft arising from sidewall transmission. The objective of the work reported was to determine the practicality of making predictions for various airplanes and the extent of the program's capabilities. The ultimate purpose was to discern the quality of predictions for tonal levels inside an aircraft occurring at the propeller blade passage frequency and its harmonics. The effort involved three tasks: (1) program validation through comparisons of predictions with scale-model test results; (2) development of utilization schemes for large (full scale) fuselages; and (3) validation through comparisons of predictions with measurements taken in flight tests on a turboprop aircraft. Findings should enable future users of the program to efficiently undertake and correctly interpret predictions.

  20. Donor Lung Procurement by Surgical Fellow with an Expectation of High Rate of Lung Utilisation.

    PubMed

    Smail, Hassiba; Saxena, Pankaj; Wallinder, Andreas; Lin, Enjarn; Snell, Gregory I; Hobson, Jamie; Zimmet, Adam D; Marasco, Silvana F; McGiffin, David C

    2017-12-22

    There is an ever increasing demand for donor lungs in patients waiting for transplantation. Lungs of many potential donors will be rejected if the standard criteria for donor assessment are followed. We have expanded our donor lung pool by accepting marginal donors and establishing a donation after circulatory death program. We have achieved comparable results using marginal donors and accepting donor lungs following donation after circulatory death. We present our assessment and technical guidelines on lung procurement taking into consideration an increasingly complex cohort of lung donors. These guidelines form the basis of the lung procurement training program involving surgical Fellows at the Alfred Hospital in Melbourne, Australia. Copyright © 2017 Australian and New Zealand Society of Cardiac and Thoracic Surgeons (ANZSCTS) and the Cardiac Society of Australia and New Zealand (CSANZ). Published by Elsevier B.V. All rights reserved.

  1. Computer programs for estimating civil aircraft economics

    NASA Technical Reports Server (NTRS)

    Maddalon, D. V.; Molloy, J. K.; Neubawer, M. J.

    1980-01-01

    Computer programs for calculating airline direct operating cost, indirect operating cost, and return on investment were developed to provide a means for determining commercial aircraft life cycle cost and economic performance. A representative wide body subsonic jet aircraft was evaluated to illustrate use of the programs.

  2. The NASA Aircraft Energy Efficiency program

    NASA Technical Reports Server (NTRS)

    Klineberg, J. M.

    1979-01-01

    A review is provided of the goals, objectives, and recent progress in each of six aircraft energy efficiency programs aimed at improved propulsive, aerodynamic and structural efficiency for future transport aircraft. Attention is given to engine component improvement, an energy efficient turbofan engine, advanced turboprops, revolutionary gains in aerodynamic efficiency for aircraft of the late 1990s, laminar flow control, and composite primary aircraft structures.

  3. Meeting the challenges with the Douglas Aircraft Company Aeroelastic Design Optimization Program (ADOP)

    NASA Technical Reports Server (NTRS)

    Rommel, Bruce A.

    1989-01-01

    An overview of the Aeroelastic Design Optimization Program (ADOP) at the Douglas Aircraft Company is given. A pilot test program involving the animation of mode shapes with solid rendering as well as wire frame displays, a complete aircraft model of a high-altitude hypersonic aircraft to test ADOP procedures, a flap model, and an aero-mesh modeler for doublet lattice aerodynamics are discussed.

  4. United States Air Force Statistical Digest, Fiscal Year 1960. Fifteenth Edition

    DTIC Science & Technology

    1960-09-30

    USAF CIVILIAN EMPLOYEES IN SALARIED AND WAGE BOARD GROUPS EMPLOYED UNDER MILITARY , ASSISTANCE PROGRAM (MAP), AT END OF QUARTER - FY � (Previous year...provide summary data on all aspects of the Mlli_ 165 tary Assistance program administered by the Air Force. The data were compiled from progress reports...Military Assistance . MAP AIRCRAFT - Aircraft in foreign countries provided by the USAF under Military Assistance Program . AIRCRAFT ATTRITION - Aircraft

  5. A review of NASA's propulsion programs for aviation

    NASA Technical Reports Server (NTRS)

    Stewart, W. L.; Johnson, H. W.; Weber, R. J.

    1978-01-01

    A review of five NASA engine-oriented propulsion programs of major importance to civil aviation are presented and discussed. Included are programs directed at exploring propulsion system concepts for (1) energy conservation subsonic aircraft (improved current turbofans, advanced turbofans, and advanced turboprops); (2) supersonic cruise aircraft (variable cycle engines); (3) general aviation aircraft (improved reciprocating engines and small gas turbines); (4) powered lift aircraft (advanced turbofans); and (5) advanced rotorcraft.

  6. The NASA Aircraft Energy Efficiency Program

    NASA Technical Reports Server (NTRS)

    Klineberg, J. M.

    1978-01-01

    The objective of the NASA Aircraft Energy Efficiency Program is to accelerate the development of advanced technology for more energy-efficient subsonic transport aircraft. This program will have application to current transport derivatives in the early 1980s and to all-new aircraft of the late 1980s and early 1990s. Six major technology projects were defined that could result in fuel savings in commercial aircraft: (1) Engine Component Improvement, (2) Energy Efficient Engine, (3) Advanced Turboprops, (4) Energy Efficiency Transport (aerodynamically speaking), (5) Laminar Flow Control, and (6) Composite Primary Structures.

  7. City and County Solar PV Training Program, Module 1: Goal Setting and Clarification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McLaren, Joyce A.

    This module will help attendees understand nuances between different types of renewable energy goals, the importance of terminology when setting and announcing goals, the value of formally clarifying priorities, and how priorities may impact procurement options. It is the first training in a series intended to help municipal staff procure solar PV for their land and buildings.

  8. CMS Software: Installation Guide and User Manual.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Straut, Christine

    A Chemical Inventory Management System (CIMS) is a system or program that is used to track chemicals at a facility or institution. An effective CIMS begins tracking these chemicals at the point of procurement and continues through use and disposal. The management of chemicals throughout the life cycle (procurement to disposal) is a key concept for the secure management of chemicals at any institution.

  9. Antiretroviral drug expenditure, pricing and judicial demand: an analysis of federal procurement data in Brazil from 2004–2011

    PubMed Central

    2014-01-01

    Background Previous studies have described expenditures for antiretroviral (ARV) medicines in Brazil through 2005. While prior studies examined overall expenditures, they have not have analyzed drug procurement data in order to describe the role of court litigation on access and pricing. Methods ARV drug procurement from private sector sources for the years 2004–2011 was obtained through the general procurement database of the Brazilian Federal Government (SIASG). Procurement was measured in Defined Daily Doses (DDD) per 1000 persons-under-treatment per day. Expenditures and price per DDD were calculated and expressed in U.S. Dollars. Justifications for ARV purchases were examined in order to determine the relationship between health litigation and incorporation into Brazil’s national treatment guidelines. Results Drug procurement of ARVs from private sources underwent marked expansion in 2005, peaked in 2009, and stabilized to 2008 levels by 2011. Expenditures followed procurement curves. Medications which were procured for the first time after 2007 cost more than medicines which were introduced before 2007. Judicial actions initially resulted in purchases of newer medications for a select number of patients in Brazil but ultimately expanded availability to a larger population through incorporation into the national treatment guidelines. Conclusions Drug procurement and expenditures for ARVs in Brazil varied between 2004–2011. The procurement of some drugs from the private sector ceased after public manufacturers started producing them locally. Judicial demand has resulted in the incorporation of newer drugs into the national treatment guidelines. In order for the AIDS treatment program to remain sustainable, efforts should be pursued to reduce prices through generic drugs, price negotiation and other public health flexibilities such as compulsory licensing. PMID:24735589

  10. Antiretroviral drug expenditure, pricing and judicial demand: an analysis of federal procurement data in Brazil from 2004-2011.

    PubMed

    Luo, Jing; Oliveira, Maria A; Ramos, Mariana B C; Maia, Aurélio; Osorio-de-Castro, Claudia G S

    2014-04-16

    Previous studies have described expenditures for antiretroviral (ARV) medicines in Brazil through 2005. While prior studies examined overall expenditures, they have not have analyzed drug procurement data in order to describe the role of court litigation on access and pricing. ARV drug procurement from private sector sources for the years 2004-2011 was obtained through the general procurement database of the Brazilian Federal Government (SIASG). Procurement was measured in Defined Daily Doses (DDD) per 1000 persons-under-treatment per day. Expenditures and price per DDD were calculated and expressed in U.S. Dollars. Justifications for ARV purchases were examined in order to determine the relationship between health litigation and incorporation into Brazil's national treatment guidelines. Drug procurement of ARVs from private sources underwent marked expansion in 2005, peaked in 2009, and stabilized to 2008 levels by 2011. Expenditures followed procurement curves. Medications which were procured for the first time after 2007 cost more than medicines which were introduced before 2007. Judicial actions initially resulted in purchases of newer medications for a select number of patients in Brazil but ultimately expanded availability to a larger population through incorporation into the national treatment guidelines. Drug procurement and expenditures for ARVs in Brazil varied between 2004-2011. The procurement of some drugs from the private sector ceased after public manufacturers started producing them locally. Judicial demand has resulted in the incorporation of newer drugs into the national treatment guidelines. In order for the AIDS treatment program to remain sustainable, efforts should be pursued to reduce prices through generic drugs, price negotiation and other public health flexibilities such as compulsory licensing.

  11. 48 CFR 23.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Use of Recovered Materials and Biobased Products 23.404 Agency...

  12. 48 CFR 23.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Use of Recovered Materials and Biobased Products 23.404 Agency...

  13. 14 CFR 135.421 - Additional maintenance requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... programs, or a program approved by the Administrator, for each aircraft engine, propeller, rotor, and each... instructions set forth by the manufacturer as required by this chapter for the aircraft, aircraft engine, propeller, rotor or item of emergency equipment. (c) For each single engine aircraft to be used in passenger...

  14. 14 CFR 135.421 - Additional maintenance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... programs, or a program approved by the Administrator, for each aircraft engine, propeller, rotor, and each... instructions set forth by the manufacturer as required by this chapter for the aircraft, aircraft engine, propeller, rotor or item of emergency equipment. (c) For each single engine aircraft to be used in passenger...

  15. 14 CFR 135.421 - Additional maintenance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... programs, or a program approved by the Administrator, for each aircraft engine, propeller, rotor, and each... instructions set forth by the manufacturer as required by this chapter for the aircraft, aircraft engine, propeller, rotor or item of emergency equipment. (c) For each single engine aircraft to be used in passenger...

  16. 14 CFR 135.421 - Additional maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... programs, or a program approved by the Administrator, for each aircraft engine, propeller, rotor, and each... instructions set forth by the manufacturer as required by this chapter for the aircraft, aircraft engine, propeller, rotor or item of emergency equipment. (c) For each single engine aircraft to be used in passenger...

  17. 14 CFR 135.421 - Additional maintenance requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... programs, or a program approved by the Administrator, for each aircraft engine, propeller, rotor, and each... instructions set forth by the manufacturer as required by this chapter for the aircraft, aircraft engine, propeller, rotor or item of emergency equipment. (c) For each single engine aircraft to be used in passenger...

  18. Small unmanned aircraft and the U.S. Forest Service : benefits, costs, and recommendations for using small unmanned aircraft in Forest Service operations

    DOT National Transportation Integrated Search

    2016-08-01

    This paper provides information to Forest Service leadership about how the agency could use unmanned aircraft across different programs, especially in program areas where aircraft use is currently limited. It draws from published uses of unmanned air...

  19. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement Advocacy...

  20. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement Advocacy...

  1. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement Advocacy...

  2. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement Advocacy...

  3. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement Advocacy...

  4. 48 CFR 19.203 - Relationship among small business programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 19.203 Relationship among small business... (subpart 19.13), Service-Disabled Veteran-Owned Small Business (SDVOSB) Procurement Program (subpart 19.14), or the Women-Owned Small Business (WOSB) Program (subpart 19.15). (b) At or below the simplified...

  5. 48 CFR 19.203 - Relationship among small business programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 19.203 Relationship among small business... (subpart 19.13), Service-Disabled Veteran-Owned Small Business (SDVOSB) Procurement Program (subpart 19.14), or the Women-Owned Small Business (WOSB) Program (subpart 19.15). (b) At or below the simplified...

  6. 48 CFR 19.203 - Relationship among small business programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 19.203 Relationship among small business... (subpart 19.13), Service-Disabled Veteran-Owned Small Business (SDVOSB) Procurement Program (subpart 19.14), or the Women-Owned Small Business (WOSB) Program (subpart 19.15). (b) At or below the simplified...

  7. Analysis of the Effectiveness of F-15E Risk Management during Peacetime Operations

    DTIC Science & Technology

    2015-06-18

    of aircraft or life . These results were compared with existing risk management programs in the form of unit worksheet assessments. This study found...Force risk management program across all fixed-wing aircraft. Rotary wing aircraft will have their own unique challenges . However, for all its...the loss of aircraft or life . These results were compared with existing risk management programs in the form of unit worksheet assessments. This

  8. Proposed Ames M2-F1, M1-L half-cone, and Langley lenticular bodies.

    NASA Technical Reports Server (NTRS)

    1962-01-01

    Dale Reed, who inaugurated the lifting-body flight research at NASA's Flight Research Center (later, Dryden Flight Research Center, Edwards, CA), originally proposed that three wooden outer shells be built. These would then be attached to the single internal steel structure. The three shapes were (viewer's left to right) the M2-F1, the M1-L, and a lenticular shape. Milt Thompson, who supported Reed's advocacy for a lifting-body research project, recommended that only the M2-F1 shell be built, believing that the M1-L shape was 'too radical,' while the lenticular one was 'too exotic.' Although the lenticular shape was often likened to that of a flying saucer, Reed's wife Donna called it the 'powder puff.' The wingless, lifting body aircraft design was initially conceived as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  9. M2-F1 ejection seat test at South Edwards

    NASA Technical Reports Server (NTRS)

    1963-01-01

    The M2-F1 was fitted with an ejection seat before the airtow flights began. The project selected the seat used in the T-37 as modified by the Weber Company to use a rocket rather than a ballistic charge for ejection. To test the ejection seat, the Flight Research Center's Dick Klein constructed a plywood mockup of the M2-F1's top deck and canopy. On the first firings, the test was unsuccessful, but on the final test the dummy in the seat landed safely. The M2-F1 ejection seat was later used in the two Lunar Landing Research Vehicles and the three Lunar Landing Training Vehicles. Three of them crashed, but in each case the pilot ejected from the vehicle successfully. The wingless, lifting body aircraft design was initially conceived as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  10. M2-F1 in flight over lakebed on tow line

    NASA Technical Reports Server (NTRS)

    1963-01-01

    Following the first M2-F1 airtow flight on 16 August 1963, the Flight Research Center used the vehicle for both research flights and to check out new lifting-body pilots. These included Bruce Peterson, Don Mallick, Fred Haise, and Bill Dana from NASA. Air Force pilots who flew the M2-F1 included Chuck Yeager, Jerry Gentry, Joe Engle, Jim Wood, and Don Sorlie, although Wood, Haise, and Engle only flew on car tows. In the three years between the first and last flights of the M2-F1, it made about 400 car tows and 77 air tows. The wingless, lifting body aircraft design was initially concieved as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  11. M2-F1 in hangar with Pontiac tow vehicle

    NASA Technical Reports Server (NTRS)

    1963-01-01

    The M2-F1 Lifting Body is seen here in a hangar with its hotrod Pontiac convertible tow vehicle at the Flight Research Center (later the Dryden Flight Research Center), Edwards, California. The car was a 1963 Pontiac Catalina convertible, fitted with a 421-cubic-inch tripower engine like those being run at the Daytona 500 auto race. The vehicle also had a four-speed transmission and a heavy-duty suspension and cooling system. A roll bar was also added and the passenger seat turned around so an observer could watch the M2-F1 while it was being towed. The rear seat was removed and a second, side-facing seat installed. The lifting-body team used the Pontiac for all the ground-tow flights over the next three years. The wingless, lifting body aircraft design was initially conceived as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. This vehicle needed to be able to tow the M2-F1 on the Rogers Dry Lakebed adjacent to NASA's Flight Research Center (FRC) at a minimum speed of 100 miles per hour. To do that, it had to handle the 400-pound pull of the M2-F1. Walter 'Whitey' Whiteside, who was a retired Air Force maintenance officer working in the FRC's Flight Operations Division, was a dirt-bike rider and hot-rodder. Together with Boyden 'Bud' Bearce in the Procurement and Supply Branch of the FRC, Whitey acquired a Pontiac Catalina convertible with the largest engine available. He took the car to Bill Straup's renowned hot-rod shop near Long Beach for modification. With a special gearbox and racing slicks, the Pontiac could tow the 1,000-pound M2-F1 110 miles per hour in 30 seconds. It proved adequate for the roughly 400 car tows that got the M2-F1 airborne to prove it could fly safely and to train pilots before they were towed behind a C-47 aircraft and released. These initial car-tow tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. A small solid landing rocket, referred to as the 'instant L/D rocket,' was installed in the rear base of the M2-F1. This rocket, which could be ignited by the pilot, provided about 250 pounds of thrust for about 10 seconds. The rocket could be used to extend the flight time near landing if needed. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program, with an X-24A and -B built by Martin. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  12. NASA Aerospace Flight Battery Program: Recommendations for Technical Requirements for Inclusion in Aerospace Battery Procurements. Volume 1, Part 2

    NASA Technical Reports Server (NTRS)

    Jung, David S.; Manzo, Michelle A.

    2010-01-01

    This NASA Aerospace Flight Battery Systems Working Group was chartered within the NASA Engineering and Safety Center (NESC). The Battery Working Group was tasked to complete tasks and to propose proactive work to address battery related, agency-wide issues on an annual basis. In its first year of operation, this proactive program addressed various aspects of the validation and verification of aerospace battery systems for NASA missions. Studies were performed, issues were discussed and in many cases, test programs were executed to generate recommendations and guidelines to reduce risk associated with various aspects of implementing battery technology in the aerospace industry. This document contains Part 2 - Volume I: Recommendations for Technical Requirements for Inclusion in Aerospace Battery Procurements of the program's operations.

  13. GASP- General Aviation Synthesis Program. Volume 1: Main program. Part 1: Theoretical development

    NASA Technical Reports Server (NTRS)

    Hague, D.

    1978-01-01

    The General Aviation synthesis program performs tasks generally associated with aircraft preliminary design and allows an analyst the capability of performing parametric studies in a rapid manner. GASP emphasizes small fixed-wing aircraft employing propulsion systems varying froma single piston engine with fixed pitch propeller through twin turboprop/ turbofan powered business or transport type aircraft. The program, which may be operated from a computer terminal in either the batch or interactive graphic mode, is comprised of modules representing the various technical disciplines integrated into a computational flow which ensures that the interacting effects of design variables are continuously accounted for in the aircraft sizing procedure. The model is a useful tool for comparing configurations, assessing aircraft performance and economics, performing tradeoff and sensitivity studies, and assessing the impact of advanced technologies on aircraft performance and economics.

  14. Optimizing Eco-Efficiency Across the Procurement Portfolio.

    PubMed

    Pelton, Rylie E O; Li, Mo; Smith, Timothy M; Lyon, Thomas P

    2016-06-07

    Manufacturing organizations' environmental impacts are often attributable to processes in the firm's upstream supply chain. Environmentally preferable procurement (EPP) and the establishment of environmental purchasing criteria can potentially reduce these indirect impacts. Life-cycle assessment (LCA) can help identify the purchasing criteria that are most effective in reducing environmental impacts. However, the high costs of LCA and the problems associated with the comparability of results have limited efforts to integrate procurement performance with quantitative organizational environmental performance targets. Moreover, environmental purchasing criteria, when implemented, are often established on a product-by-product basis without consideration of other products in the procurement portfolio. We develop an approach that utilizes streamlined LCA methods, together with linear programming, to determine optimal portfolios of product impact-reduction opportunities under budget constraints. The approach is illustrated through a simulated breakfast cereal manufacturing firm procuring grain, containerboard boxes, plastic packaging, electricity, and industrial cleaning solutions. Results suggest that extending EPP decisions and resources to the portfolio level, recently made feasible through the methods illustrated herein, can provide substantially greater CO2e and water-depletion reductions per dollar spend than a product-by-product approach, creating opportunities for procurement organizations to participate in firm-wide environmental impact reduction targets.

  15. NASA's program on icing research and technology

    NASA Technical Reports Server (NTRS)

    Reinmann, John J.; Shaw, Robert J.; Ranaudo, Richard J.

    1989-01-01

    NASA's program in aircraft icing research and technology is reviewed. The program relies heavily on computer codes and modern applied physics technology in seeking icing solutions on a finer scale than those offered in earlier programs. Three major goals of this program are to offer new approaches to ice protection, to improve our ability to model the response of an aircraft to an icing encounter, and to provide improved techniques and facilities for ground and flight testing. This paper reviews the following program elements: (1) new approaches to ice protection; (2) numerical codes for deicer analysis; (3) measurement and prediction of ice accretion and its effect on aircraft and aircraft components; (4) special wind tunnel test techniques for rotorcraft icing; (5) improvements of icing wind tunnels and research aircraft; (6) ground de-icing fluids used in winter operation; (7) fundamental studies in icing; and (8) droplet sizing instruments for icing clouds.

  16. The Aircraft Morphing Program

    NASA Technical Reports Server (NTRS)

    Wlezien, R. W.; Horner, G. C.; McGowan, A. R.; Padula, S. L.; Scott, M. A.; Silcox, R. J.; Simpson, J. O.

    1998-01-01

    In the last decade smart technologies have become enablers that cut across traditional boundaries in materials science and engineering. Here we define smart to mean embedded actuation, sensing, and control logic in a tightly coupled feedback loop. While multiple successes have been achieved in the laboratory, we have yet to see the general applicability of smart devices to real aircraft systems. The NASA Aircraft Morphing program is an attempt to couple research across a wide range of disciplines to integrate smart technologies into high payoff aircraft applications. The program bridges research in seven individual disciplines and combines the effort into activities in three primary program thrusts. System studies are used to assess the highest- payoff program objectives, and specific research activities are defined to address the technologies required for development of smart aircraft systems. In this paper we address the overall program goals and programmatic structure, and discuss the challenges associated with bringing the technologies to fruition.

  17. Changes in the organ procurement system in South Korea: effects on brain-dead donor numbers.

    PubMed

    Lee, S D; Kim, J H

    2009-11-01

    In Korea, the Organ Transplantation Act came into effect in 2000, establishing the Korean Network for Organ Sharing (KONOS) with centralized authority for organ procurement as well as for approval of donors and recipients to ensure fair organ allocation. However, the number of brain-dead donors decreased sharply, and the organ allocation system proved inefficient. The government revised the Organ Transplantation Act in August 2002, introducing an incentive system. If a transplantation hospital formed a Committee for Brain Death Evaluation and a Hospital Organ Procurement Organization, it could receive a kidney from a brain dead-donor as an incentive to foster organ procurement regardless of the KONOS wait list. The government also launched a pilot brain-dead donor registry program to strengthen Hospital Organ Procurement Organization activity. If local hospitals collaborated with specialized hospitals in organ procurement, local hospitals obtained financial incentives. But because the organ shortage problem has not been resolved, the government has proposed four initiatives: first, broadening the incentive system, which makes it possible to give each specialized hospital a choice of one of eight organs from each donor as an incentive; second, development of an Independent Organ Procurement Organization; third introduction of an opt-out system; and last, improvement of the Committee for Brain Death Evaluation system. It is uncertain which initiatives will be adopted, but changes in organ procurement systems are nonetheless considered a key to solve the organ shortage problem in Korea.

  18. A Historical Review of Training Requirements for Unmanned Aircraft Systems, Small Unmanned Aircraft Systems, and Manned Operations (1997-2014)

    DOT National Transportation Integrated Search

    2017-08-01

    There are several mature Unmanned Aircraft System (UAS) and Small Unmanned Aircraft System (sUAS) training programs available for analysis. Many of these programs were developed by the various branches with the U.S. Department of Defense (DoD) in con...

  19. STOVL aircraft simulation for integrated flight and propulsion control research

    NASA Technical Reports Server (NTRS)

    Mihaloew, James R.; Drummond, Colin K.

    1989-01-01

    The United States is in the initial stages of committing to a national program to develop a supersonic short takeoff and vertical landing (STOVL) aircraft. The goal of the propulsion community in this effort is to have the enabling propulsion technologies for this type aircraft in place to permit a low risk decision regarding the initiation of a research STOVL supersonic attack/fighter aircraft in the late mid-90's. This technology will effectively integrate, enhance, and extend the supersonic cruise, STOVL and fighter/attack programs to enable U.S. industry to develop a revolutionary supersonic short takeoff and vertical landing fighter/attack aircraft in the post-ATF period. A joint NASA Lewis and NASA Ames research program, with the objective of developing and validating technology for integrated-flight propulsion control design methodologies for short takeoff and vertical landing (STOVL) aircraft, was planned and is underway. This program, the NASA Supersonic STOVL Integrated Flight-Propulsion Controls Program, is a major element of the overall NASA-Lewis Supersonic STOVL Propulsion Technology Program. It uses an integrated approach to develop an integrated program to achieve integrated flight-propulsion control technology. Essential elements of the integrated controls research program are realtime simulations of the integrated aircraft and propulsion systems which will be used in integrated control concept development and evaluations. This paper describes pertinent parts of the research program leading up to the related realtime simulation development and remarks on the simulation structure to accommodate propulsion system hardware drop-in for real system evaluation.

  20. East Europe Report, Economic and Industrial Affairs

    DTIC Science & Technology

    1984-07-23

    publication in no way represent the poli- cies, views or attitudes of the U.S. Government. PROCUREMENT OF PUBLICATIONS JPRS publications may be ordered...U.S. Government Printing Office, Washington, D.C. 20402. Correspondence pertaining to matters other than procurement * may be addressed to Joint...formulation and coordination of joint programs for cooperation and inte- gration in basic subsectors and production facilities and the solution of

  1. United Nations: Progress on Management Reform Efforts has Varied

    DTIC Science & Technology

    2007-11-01

    this review, GAO was asked to (1) determine the progress of UN management reform initiatives in five key areas—ethics, oversight , procurement... oversight , procurement, management operations of the Secretariat, and review of programs and activities (known as mandates). To determine the...forms. Member states made some progress in improving oversight at the UN when they created an Independent Audit Advisory Committee, which is expected

  2. Analysis of Critical Parts and Materials

    DTIC Science & Technology

    1980-12-01

    1 1 1% 1% 1% 1% Large Orders Manual Ordering of Some Critical Parts Order Spares with Original Order Incentives Belter Capital Investment...demand 23 Large orders 24 Long lead procurement funding (including raw materials, facility funding) 25 Manpower analysis and training 26 Manual ... ordering of some critical parts 27 More active role in schedule negotiation 28 Multiple source procurements 29 Multi-year program funding 30 Order

  3. 78 FR 18932 - Public Meeting: Unmanned Aircraft Systems Test Site Program; Privacy Approach

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... operation of the UAS Test Sites. They are not intended to pre-determine the long- term policy and regulatory...-0061] Public Meeting: Unmanned Aircraft Systems Test Site Program; Privacy Approach AGENCY: Federal... the unmanned aircraft systems (UAS) test site program. The FAA is seeking the views from the public...

  4. 76 FR 22603 - Geographic Preference Option for the Procurement of Unprocessed Agricultural Products in Child...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Program, Special Milk Program for Children, Child and Adult Care Food Program and Summer Food Service... Program, Fresh Fruit and Vegetable Program, Special Milk Program, Child and Adult Care Food Program and... and 10.553, respectively. The Special Milk Program is listed under No. 10.556. The Child and Adult...

  5. Effectiveness evaluation of STOL transport operations (phase 2). [computer simulation program of commercial short haul aircraft operations

    NASA Technical Reports Server (NTRS)

    Welp, D. W.; Brown, R. A.; Ullman, D. G.; Kuhner, M. B.

    1974-01-01

    A computer simulation program which models a commercial short-haul aircraft operating in the civil air system was developed. The purpose of the program is to evaluate the effect of a given aircraft avionics capability on the ability of the aircraft to perform on-time carrier operations. The program outputs consist primarily of those quantities which can be used to determine direct operating costs. These include: (1) schedule reliability or delays, (2) repairs/replacements, (3) fuel consumption, and (4) cancellations. More comprehensive models of the terminal area environment were added and a simulation of an existing airline operation was conducted to obtain a form of model verification. The capability of the program to provide comparative results (sensitivity analysis) was then demonstrated by modifying the aircraft avionics capability for additional computer simulations.

  6. Technology for reducing aircraft engine pollution

    NASA Technical Reports Server (NTRS)

    Rudey, R. A.; Kempke, E. E., Jr.

    1975-01-01

    Programs have been initiated by NASA to develop and demonstrate advanced technology for reducing aircraft gas turbine and piston engine pollutant emissions. These programs encompass engines currently in use for a wide variety of aircraft from widebody-jets to general aviation. Emission goals for these programs are consistent with the established EPA standards. Full-scale engine demonstrations of the most promising pollutant reduction techniques are planned within the next three years. Preliminary tests of advanced technology gas turbine engine combustors indicate that significant reductions in all major pollutant emissions should be attainable in present generation aircraft engines without adverse effects on fuel consumption. Fundamental-type programs are yielding results which indicate that future generation gas turbine aircraft engines may be able to utilize extremely low pollutant emission combustion systems.

  7. Impact and promise of NASA aeropropulsion technology

    NASA Technical Reports Server (NTRS)

    Saunders, Neal T.; Bowditch, David N.

    1987-01-01

    The aeropropulsion industry in the United States has established an enviable record of leading the world in aeropropulsion for commercial and military aircraft. The NASA aeropropulsion propulsion program (primarily conducted through the Lewis Research Center) has significantly contributed to that success through research and technology advances and technology demonstrations such as the Refan, Engine Component Improvement, and the Energy Efficient Engine Programs. Some past NASA contributions to engines in current aircraft are reviewed, and technologies emerging from current research programs for the aircraft of the 1990's are described. Finally, current program thrusts toward improving propulsion systems in the 2000's for subsonic commercial aircraft and higher speed aircraft such as the High-Speed Civil Transport and the National Aerospace Plane (NASP) are discussed.

  8. The atmospheric effects of stratospheric aircraft: A third program report

    NASA Technical Reports Server (NTRS)

    Stolarski, Richard S. (Editor); Wesoky, Howard L. (Editor)

    1993-01-01

    A third report from the Atmospheric Effects of Stratospheric Aircraft (AESA) component of NASA's High-Speed Research Program (HSRP) is presented. Market and technology considerations continue to provide an impetus for high-speed civil transport research. A recent United Nations Environment Program scientific assessment showed that considerable uncertainty still exists about the possible impact of aircraft on the atmosphere. The AESA was designed to develop the body of scientific knowledge necessary for the evaluation of the impact of stratospheric aircraft on the atmosphere. The first Program report presented the basic objectives and plans for AESA. This third report marks the midpoint of the program and presents the status of the ongoing research on the impact of stratospheric aircraft on the atmosphere as reported at the third annual AESA Program meeting in June 1993. The focus of the program is on predicted atmospheric changes resulting from projected HSCT emissions. Topics reported on cover how high-speed civil transports (HSCT) might affect stratospheric ozone, emissions scenarios and databases to assess potential atmospheric effects from HSCT's, calculated results from 2-D zonal mean models using emissions data, engine trace constituent measurements, and exhaust plume/aircraft wake vortex interactions.

  9. Analysis and calculation of lightning-induced voltages in aircraft electrical circuits

    NASA Technical Reports Server (NTRS)

    Plumer, J. A.

    1974-01-01

    Techniques to calculate the transfer functions relating lightning-induced voltages in aircraft electrical circuits to aircraft physical characteristics and lightning current parameters are discussed. The analytical work was carried out concurrently with an experimental program of measurements of lightning-induced voltages in the electrical circuits of an F89-J aircraft. A computer program, ETCAL, developed earlier to calculate resistive and inductive transfer functions is refined to account for skin effect, providing results more valid over a wider range of lightning waveshapes than formerly possible. A computer program, WING, is derived to calculate the resistive and inductive transfer functions between a basic aircraft wing and a circuit conductor inside it. Good agreement is obtained between transfer inductances calculated by WING and those reduced from measured data by ETCAL. This computer program shows promise of expansion to permit eventual calculation of potential lightning-induced voltages in electrical circuits of complete aircraft in the design stage.

  10. Role of research aircraft in technology development

    NASA Technical Reports Server (NTRS)

    Szalai, K. J.

    1984-01-01

    The United States's aeronautical research program has been rich in the use of research aircraft to explore new flight regimes, develop individual aeronautical concepts, and investigate new vehicle classes and configurations. This paper reviews the NASA supercritical wing, digital fly-by-wire, HiMAT, and AD-1 oblique-wing flight research programs, and draws from these examples general conclusions regarding the role and impact of research aircraft in technology development. The impact of a flight program on spinoff technology is also addressed. The secondary, serendipitous results are often highly significant. Finally, future research aircraft programs are examined for technology trends and expected results.

  11. A computer program for detailed analysis of the takeoff and approach performance capabilities of transport category aircraft

    NASA Technical Reports Server (NTRS)

    Foss, W. E., Jr.

    1979-01-01

    The takeoff and approach performance of an aircraft is calculated in accordance with the airworthiness standards of the Federal Aviation Regulations. The aircraft and flight constraints are represented in sufficient detail to permit realistic sensitivity studies in terms of either configuration modifications or changes in operational procedures. The program may be used to investigate advanced operational procedures for noise alleviation such as programmed throttle and flap controls. Extensive profile time history data are generated and are placed on an interface file which can be input directly to the NASA aircraft noise prediction program (ANOPP).

  12. NASA Boeing 737 Aircraft Test Results from 1996 Joint Winter Runway Friction Measurement Program

    NASA Technical Reports Server (NTRS)

    Yager, Thomas J.

    1996-01-01

    A description of the joint test program objectives and scope is given together with the performance capability of the NASA Langley B-737 instrumented aircraft. The B-737 test run matrix conducted during the first 8 months of this 5-year program is discussed with a description of the different runway conditions evaluated. Some preliminary test results are discussed concerning the Electronic Recording Decelerometer (ERD) readings and a comparison of B-737 aircraft braking performance for different winter runway conditions. Detailed aircraft parameter time history records, analysis of ground vehicle friction measurements and harmonization with aircraft braking performance, assessment of induced aircraft contaminant drag, and evaluation of the effects of other factors on aircraft/ground vehicle friction performance will be documented in a NASA Technical Report which is being prepared for publication next year.

  13. Identifying new technologies that save energy and reduce costs to the Federal sector: The New Technology Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunt, W.D.M.; Conover, D.R.; Stockmeyer, M.K.

    1995-11-01

    In 1990 the New Technology Demonstration Program (formerly the Test Bed Demonstration Program) was initiated by the US Department of Energy`s Office (DOE`s) of Federal Energy Management Programs with the purpose of accelerating the introduction of new technologies into the Federal sector. The program has since expanded into a multi-laboratory collaborative effort that evaluates new technologies and shares the results with the Federal design and procurement communities. These evaluations are performed on a collaborative basis which typically includes technology manufacturers, Federal facilities, utilities, trade associations, research institutes, and other in partnership with DOE. The end result is a range ofmore » effective technology transfer tools that provide operations and performance data on new technologies to Federal designers, building managers, and procurement officials. These tools assist in accelerating a technology`s Federal application and realizing reductions in energy consumption and costs.« less

  14. Experiential learning not enough for organ procurement surgery: implications for perioperative nursing education.

    PubMed

    Smith, Zaneta; Leslie, Gavin; Wynaden, Dianne

    2015-12-01

    Perioperative nurses play a vital role in assisting in surgical procedures for multiorgan procurement, receiving little education apart from on-the-job experiential learning when they are asked to participate in these procedures. Within an Australian context and as part of a larger study, this article describes issues that hindered perioperative nurses' participatory experiences as a result of lacking education, previous exposure, and preparation for assisting in surgical procedures for organ procurement. The grounded theory method was used to develop a substantive theory of perioperative nurses' experiences of participating in surgical procedures for multiorgan procurement. Thirty-five perioperative nurses who had experience in surgical procedures for organ procurement from regional, rural, and metropolitan hospitals of 2 Australian states, New South Wales and Western Australia, participated in the research. Levels of knowledge and experience emerged from the data as an influencing condition and was reported to affect the perioperative nurses' participatory experiences when assisting in procurement surgical procedures. Six components of levels of knowledge and experience were identified and are described. The findings from this study provide a unique contribution to the existing literature by providing an in-depth understanding of the educational needs of perioperative nurses in order to assist successfully in multiorgan procurement procedures. These findings could guide further research with implications for clinical initiatives or education programs specifically targeting the perioperative nursing profession both locally and internationally.

  15. Biofuels, Biolubricants and the BioPreferred(SM) Program

    USDA-ARS?s Scientific Manuscript database

    The BioPreferred(SM) Program is a U.S. government initiative intended to encourage the development and widespread use of biofuels, biolubricants, and other biobased products in the U.S. The program consists of the preferred procurement and the voluntary labeling programs. Companies wishing to have t...

  16. M2-F1 in flight being towed by a C-47

    NASA Technical Reports Server (NTRS)

    1964-01-01

    The M2-F1 Lifting Body is seen here being towed behind a C-47 at the Flight Research Center (later redesignated the Dryden Flight Research Center), Edwards, California. In this rear view, the M2-F1 is flying above and to one side of the C-47. This was done to avoid wake turbulence from the towplane. Lacking wings, the M2-F1 used an unusual configuration for its control surfaces. It had two rudders on the fins, two elevons (called 'elephant ears') mounted on the outsides of the fins, and two body flaps on the upper rear fuselage. The wingless, lifting body aircraft design was initially concieved as a means of landing an aircraft horizontally after atmospheric reentry. The absence of wings would make the extreme heat of re-entry less damaging to the vehicle. In 1962, Dryden management approved a program to build a lightweight, unpowered lifting body as a prototype to flight test the wingless concept. It would look like a 'flying bathtub,' and was designated the M2-F1, the 'M' referring to 'manned' and 'F' referring to 'flight' version. It featured a plywood shell placed over a tubular steel frame crafted at Dryden. Construction was completed in 1963. The first flight tests of the M2-F1 were over Rogers Dry Lake at the end of a tow rope attached to a hopped-up Pontiac convertible driven at speeds up to about 120 mph. These initial tests produced enough flight data about the M2-F1 to proceed with flights behind the C-47 tow plane at greater altitudes. The C-47 took the craft to an altitude of 12,000 where free flights back to Rogers Dry Lake began. Pilot for the first series of flights of the M2-F1 was NASA research pilot Milt Thompson. Typical glide flights with the M2-F1 lasted about two minutes and reached speeds of 110 to l20 mph. More than 400 ground tows and 77 aircraft tow flights were carried out with the M2-F1. The success of Dryden's M2-F1 program led to NASA's development and construction of two heavyweight lifting bodies based on studies at NASA's Ames and Langley research centers--the M2-F2 and the HL-10, both built by the Northrop Corporation, and the U.S. Air Force's X-24 program. The Lifting Body program also heavily influenced the Space Shuttle program. The M2-F1 program demonstrated the feasibility of the lifting body concept for horizontal landings of atmospheric entry vehicles. It also demonstrated a procurement and management concept for prototype flight test vehicles that produced rapid results at very low cost (approximately $50,000, excluding salaries of government employees assigned to the project).

  17. Factors influencing global antiretroviral procurement prices.

    PubMed

    Wirtz, Veronika J; Forsythe, Steven; Valencia-Mendoza, Atanacio; Bautista-Arredondo, Sergio

    2009-11-18

    Antiretroviral medicines (ARVs) are one of the most costly parts of HIV/AIDS treatment. Many countries are struggling to provide universal access to ARVs for all people living with HIV and AIDS. Although substantial price reductions of ARVs have occurred, especially between 2002 and 2008, achieving sustainable access for the next several decades remains a major challenge for most low- and middle-income countries. The objectives of the present study were twofold: first, to analyze global ARV prices between 2005 and 2008 and associated factors, particularly procurement methods and key donor policies on ARV procurement efficiency; second, to discuss the options of procurement processes and policies that should be considered when implementing or reforming access to ARV programs. An ARV-medicines price-analysis was carried out using the Global Price Reporting Mechanism from the World Health Organization. For a selection of 12 ARVs, global median prices and price variation were calculated. Linear regression models for each ARV were used to identify factors that were associated with lower procurement prices. Logistic regression models were used to identify the characteristics of those countries which procure below the highest and lowest direct manufactured costs. Three key factors appear to have an influence on a country's ARV prices: (a) whether the product is generic or not; (b) the socioeconomic status of the country; (c) whether the country is a member of the Clinton HIV/AIDS Initiative. Factors which did not influence procurement below the highest direct manufactured costs were HIV prevalence, procurement volume, whether the country belongs to the least developed countries or a focus country of the United States President's Emergency Plan For AIDS Relief. One of the principal mechanisms that can help to lower prices for ARV over the next several decades is increasing procurement efficiency. Benchmarking prices could be one useful tool to achieve this.

  18. Integrated Research/Education University Aircraft Design Program Development

    DTIC Science & Technology

    2017-04-06

    iterations and loop shaping compared to MIMO control methods. Despite the drawbacks, loop closure and classical methods are the design methods most commonly...AFRL-AFOSR-VA-TR-2017-0077 Integrated Research/Education University Aircraft Design Program Development Eli Livne UNIVERSITY OF WASHINGTON 4333...SUBTITLE Integrated Research/Education University Aircraft Design Program Development 5a.  CONTRACT NUMBER 5b.  GRANT NUMBER FA9550-14-1-0027 5c.  PROGRAM

  19. NASA Aeronautics: Research and Technology Program Highlights

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This report contains numerous color illustrations to describe the NASA programs in aeronautics. The basic ideas involved are explained in brief paragraphs. The seven chapters deal with Subsonic aircraft, High-speed transport, High-performance military aircraft, Hypersonic/Transatmospheric vehicles, Critical disciplines, National facilities and Organizations & installations. Some individual aircraft discussed are : the SR-71 aircraft, aerospace planes, the high-speed civil transport (HSCT), the X-29 forward-swept wing research aircraft, and the X-31 aircraft. Critical disciplines discussed are numerical aerodynamic simulation, computational fluid dynamics, computational structural dynamics and new experimental testing techniques.

  20. Aircraft noise source and computer programs - User's guide

    NASA Technical Reports Server (NTRS)

    Crowley, K. C.; Jaeger, M. A.; Meldrum, D. F.

    1973-01-01

    The application of computer programs for predicting the noise-time histories and noise contours for five types of aircraft is reported. The aircraft considered are: (1) turbojet, (2) turbofan, (3) turboprop, (4) V/STOL, and (5) helicopter. Three principle considerations incorporated in the design of the noise prediction program are core effectiveness, limited input, and variable output reporting.

  1. Simulating a Direction-Finder Search for an ELT

    NASA Technical Reports Server (NTRS)

    Bream, Bruce

    2005-01-01

    A computer program simulates the operation of direction-finding equipment engaged in a search for an emergency locator transmitter (ELT) aboard an aircraft that has crashed. The simulated equipment is patterned after the equipment used by the Civil Air Patrol to search for missing aircraft. The program is designed to be used for training in radio direction-finding and/or searching for missing aircraft without incurring the expense and risk of using real aircraft and ground search resources. The program places a hidden ELT on a map and enables the user to search for the location of the ELT by moving a 14 NASA Tech Briefs, March 2005 small aircraft image around the map while observing signal-strength and direction readings on a simulated direction- finding locator instrument. As the simulated aircraft is turned and moved on the map, the program updates the readings on the direction-finding instrument to reflect the current position and heading of the aircraft relative to the location of the ELT. The software is distributed in a zip file that contains an installation program. The software runs on the Microsoft Windows 9x, NT, and XP operating systems.

  2. Green Power Partnership Basic Program Information

    EPA Pesticide Factsheets

    EPA's Green Power Partnership is a voluntary program designed to reduce the environmental impact of electricity generation by promoting renewable energy. Partners commit to procuring green power that meets EPA's requirements and receive recognition.

  3. Impact and promise of NASA aeropropulsion technology

    NASA Technical Reports Server (NTRS)

    Saunders, Neal T.; Bowditch, David N.

    1990-01-01

    The aeropropulsion industry in the U.S. has established an enviable record of leading the world in aeropropulsion for commercial and military aircraft. NASA's aeropropulsion program (primarily conducted through the Lewis Research Center) has significantly contributed to that success through research and technology advances and technology demonstration. Some past NASA contributions to engines in current aircraft are reviewed, and technologies emerging from current research programs for the aircraft of the 1990's are described. Finally, current program thrusts toward improving propulsion systems in the 2000's for subsonic commercial aircraft and higher speed aircraft such as the High-Speed Civil Transport and the National Aerospace Plane are discussed.

  4. NASA University Program Management Information System

    NASA Technical Reports Server (NTRS)

    1999-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. (See the bar chart on the next page). This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  5. 76 FR 3789 - Voluntary Labeling Program for Biobased Products

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... manufacturer or vendor has provided relevant information on the product for the USDA BioPreferred Program Web... labeling component of the BioPreferred Program. The final rule also applies to other entities (e.g., trade... Procurement Program (one part of the BioPreferred\\SM\\ Program) is available on the Internet at http://www...

  6. Developing an Intergenerational Program.

    ERIC Educational Resources Information Center

    Brummel, Steven W.

    1989-01-01

    Steps in the development of intergenerational programs include the following: (1) needs assessment; (2) planning; (3) implementation; (4) assuring program longevity; and (5) establishing a national focus. Detailed description of such stages as facility and site procurement, recruitment, orientation, training, maintenance, and support is provided.…

  7. Quiet Short-Haul Research Aircraft Joint Navy/NASA Sea Trials

    NASA Technical Reports Server (NTRS)

    Queen, S.; Cochrane, J.

    1982-01-01

    The Quiet Short-Haul Research Aircraft (QSRA) is a flight facility which Ames Research Center is using to conduct a broad program of terminal area and low-speed, propulsive-life flight research. A joint Navy/NASA flight research program used the QSRA to investigate the application of advanced propulsive-lift technology to the naval aircraft-carrier environment. Flight performance of the QSRA is presented together with the results or the joint Navy/NASA flight program. During the joint program, the QSRA operated aboard the USS Kitty Hawk for 4 days, during which numerous unarrested landings and free deck takeoffs were accomplished. These operations demonstrated that a large aircraft incorporating upper-surface-blowing, propulsive-life technology can be operated in the aircraft-carrier environment without any unusual problems.

  8. Secretary | Center for Cancer Research

    Cancer.gov

    We are looking for a pleasant, organized, dependable person to serve as a full-time secretary in the Basic Science Program (BSP) at the Frederick National Laboratory for Cancer Research (FNCLR).  The BSP provides procurement and logistical support to the laboratories of the Center for Cancer Research.  Tasks include high volume procurement (blanket orders, purchase requests, credit card), sorting and distributing mail, travel coordination, and spending/budget monitoring. 

  9. Airworthiness criteria development for powered-lift aircraft: A program summary

    NASA Technical Reports Server (NTRS)

    Heffley, R. K.; Stapleford, R. L.; Rumold, R. C.

    1977-01-01

    A four-year simulation program to develop airworthiness criteria for powered-lift aircraft is summarized. All flight phases affected by use of powered lift (approach, landing, takeoff) are treated with regard to airworthiness problem areas (limiting flight conditions and safety margins: stability, control, and performance; and systems failure). The general features of powered-lift aircraft are compared to conventional aircraft.

  10. Computer program to predict noise of general aviation aircraft: User's guide

    NASA Technical Reports Server (NTRS)

    Mitchell, J. A.; Barton, C. K.; Kisner, L. S.; Lyon, C. A.

    1982-01-01

    Program NOISE predicts General Aviation Aircraft far-field noise levels at FAA FAR Part 36 certification conditions. It will also predict near-field and cabin noise levels for turboprop aircraft and static engine component far-field noise levels.

  11. Design of a high-performance rotary stratified-charge research aircraft engine

    NASA Technical Reports Server (NTRS)

    Jones, C.; Mount, R. E.

    1984-01-01

    The power section for an advanced rotary stratified-charge general aviation engine has been designed under contract to NASA. The single-rotor research engine of 40 cubic-inches displacement (RCI-40), now being procured for test initiation this summer, is targeted for 320 T.O. horse-power in a two-rotor production engine. The research engine is designed for operating on jet-fuel, gasoline or diesel fuel and will be used to explore applicable advanced technologies and to optimize high output performance variables. Design of major components of the engine is described in this paper.

  12. Studies of aircraft differential maneuvering. Report 75-27: Calculating of differential-turning barrier surfaces. Report 75-26: A user's guide to the aircraft energy-turn and tandem-motion computer programs. Report 75-7: A user's guide to the aircraft energy-turn hodograph program. [numerical analysis of tactics and aircraft maneuvers of supersonic attack aircraft

    NASA Technical Reports Server (NTRS)

    Kelley, H. J.; Lefton, L.

    1976-01-01

    The numerical analysis of composite differential-turn trajectory pairs was studied for 'fast-evader' and 'neutral-evader' attitude dynamics idealization for attack aircraft. Transversality and generalized corner conditions are examined and the joining of trajectory segments discussed. A criterion is given for the screening of 'tandem-motion' trajectory segments. Main focus is upon the computation of barrier surfaces. Fortunately, from a computational viewpoint, the trajectory pairs defining these surfaces need not be calculated completely, the final subarc of multiple-subarc pairs not being required. Some calculations for pairs of example aircraft are presented. A computer program used to perform the calculations is included.

  13. Integrating sodium reduction strategies in the procurement process and contracting of food venues in the County of Los Angeles government, 2010-2012.

    PubMed

    Cummings, Patricia L; Kuo, Tony; Gase, Lauren N; Mugavero, Kristy

    2014-01-01

    Since sodium is ubiquitous in the food supply, recent approaches to sodium reduction have focused on increasing the availability of lower-sodium products through system-level and environmental changes. This article reviews integrated efforts by the Los Angeles County Sodium Reduction Initiative to implement these strategies at food venues in the County of Los Angeles government. The review used mixed methods, including a scan of the literature, key informant interviews, and lessons learned during 2010-2012 to assess program progress. Leveraging technical expertise and shared resources, the initiative strategically incorporated sodium reduction strategies into the overall work plan of a multipartnership food procurement program in Los Angeles County. To date, 3 County departments have incorporated new or updated nutrition requirements that included sodium limits and other strategies. The strategic coupling of sodium reduction to food procurement and general health promotion allowed for simultaneous advancement and acceleration of the County's sodium reduction agenda.

  14. Integrating Sodium Reduction Strategies in the Procurement Process and Contracting of Food Venues in the County of Los Angeles Government, 2010–2012

    PubMed Central

    Cummings, Patricia L.; Kuo, Tony; Gase, Lauren N.; Mugavero, Kristy

    2015-01-01

    Since sodium is ubiquitous in the food supply, recent approaches to sodium reduction have focused on increasing the availability of lower-sodium products through system-level and environmental changes. This article reviews integrated efforts by the Los Angeles County Sodium Reduction Initiative to implement these strategies at food venues in the County of Los Angeles government. The review used mixed methods, including a scan of the literature, key informant interviews, and lessons learned during 2010–2012 to assess program progress. Leveraging technical expertise and shared resources, the initiative strategically incorporated sodium reduction strategies into the overall work plan of a multipartnership food procurement program in Los Angeles County. To date, 3 County departments have incorporated new or updated nutrition requirements that included sodium limits and other strategies. The strategic coupling of sodium reduction to food procurement and general health promotion allowed for simultaneous advancement and acceleration of the County’s sodium reduction agenda. PMID:24322811

  15. Aircraft operations management manual

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The NASA aircraft operations program is a multifaceted, highly diverse entity that directly supports the agency mission in aeronautical research and development, space science and applications, space flight, astronaut readiness training, and related activities through research and development, program support, and mission management aircraft operations flights. Users of the program are interagency, inter-government, international, and the business community. This manual provides guidelines to establish policy for the management of NASA aircraft resources, aircraft operations, and related matters. This policy is an integral part of and must be followed when establishing field installation policy and procedures covering the management of NASA aircraft operations. Each operating location will develop appropriate local procedures that conform with the requirements of this handbook. This manual should be used in conjunction with other governing instructions, handbooks, and manuals.

  16. 32 CFR 516.68 - Program Fraud Civil Remedies Act (PFCRA).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AUTHORITIES AND PUBLIC RELATIONS LITIGATION Remedies in Procurement Fraud and Corruption § 516.68 Program Fraud Civil Remedies Act (PFCRA). (a) PFCRA was enacted on 21 October 1986 (Public Law 99-509) and...

  17. Aeronautics research and technology program and specific objectives

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Aeronautics research and technology program objectives in fluid and thermal physics, materials and structures, controls and guidance, human factors, multidisciplinary activities, computer science and applications, propulsion, rotorcraft, high speed aircraft, subsonic aircraft, and rotorcraft and high speed aircraft systems technology are addressed.

  18. Associations between Caries among Children and Household Sugar Procurement, Exposure to Fluoridated Water and Socioeconomic Indicators in the Brazilian Capital Cities

    PubMed Central

    Gonçalves, Michele Martins; Leles, Cláudio Rodrigues; Freire, Maria do Carmo Matias

    2013-01-01

    The objective of this ecological study was to investigate the association between caries experience in 5- and 12-year-old Brazilian children in 2010 and household sugar procurement in 2003 and the effects of exposure to water fluoridation and socioeconomic indicators. Sample units were all 27 Brazilian capital cities. Data were obtained from the National Surveys of Oral Health; the National Household Food Budget Survey; and the United Nations Program for Development. Data analysis included correlation coefficients, exploratory factor analysis, and linear regression. There were significant negative associations between caries experience and procurement of confectionery, fluoridated water, HDI, and per capita income. Procurement of confectionery and soft drinks was positively associated with HDI and per capita income. Exploratory factor analysis grouped the independent variables by reducing highly correlated variables into two uncorrelated component variables that explained 86.1% of total variance. The first component included income, HDI, water fluoridation, and procurement of confectionery, while the second included free sugar and procurement of soft drinks. Multiple regression analysis showed that caries is associated with the first component. Caries experience was associated with better socioeconomic indicators of a city and exposure to fluoridated water, which may affect the impact of sugars on the disease. PMID:24307900

  19. Department of the Army Procurement Programs, Committee Staff Procurement Backup Book FY 2001 Budget Estimate, Other Procurement, Army Activity 2, Communications and Electronics

    DTIC Science & Technology

    2000-02-01

    CON -^OOCOOOOOOCMCM^t...0 (D 3 5 o o .C CO o £- U >- u. a CO W ,_ O S N N CO o a> CON in s o CO s o co CM in co en o i- o CO CM §1 Ü O CO •* 3 O to 8 ,o CO...34* *-■ S « CO ~ -— CD CD E Ü •*= CD TO .2> 2 £ g O T3 T3 ■i °. 1 8 E o O p Ü fc. _- >» Pro O (0 »1 0- (D If E ° S £

  20. Department of the Army Procurement Programs. Committee Staff Procurement Backup Book FY 2001 Budget Estimate. Procurement of Ammunition, Army.

    DTIC Science & Technology

    2000-02-01

    tD c...UJ _i UJ 2 o o UJ 1- 2 O o 2 o w «N o 0. § >- u. Ü u z til < V 3 _i < 2 u. a. -b o 3 CN i 0. o a. CO ci a. T- T- 1^ tD ...Tf <=f >- CM CN CN u_ © CD •a a> J3 o o CD CO to Z c CM Ö Ö Ö £ E >• "*" T~ JB tD u_ ~ UJ a. E E ɘ o a. o c i o o CM CM CM W a CM

Top