Sample records for procurement specification phase

  1. Arizona TeleMedicine Network: System Procurement Specifications, Phase 1.

    ERIC Educational Resources Information Center

    Atlantic Research Corp., Alexandria, VA.

    Defining the system procurement specifications for a telecommunications system designed to provide health services to rurally isolated American Indians living on reservations in Arizona, this document presents detailed specifications for: (1) a complete communications facility; (2) a mobile health communications treatment and diagnosis unit; (3)…

  2. Procurement specifications report. IMBLS phase B-4

    NASA Technical Reports Server (NTRS)

    1970-01-01

    Procurement specifications to provide vendors of space systems with supporting information to accurately price the selected major buy items are illustrated. In performing this task, rigid constraints on specifications and drawing details are avoided beyond those necessary to define basic requirements. Described are digital processing equipment, mass spectrometer, body mass measuring device, sensors, bio-belt power source, vision tester and instrumentation for a biochemical station.

  3. Standard spacecraft procurement analysis: A case study in NASA-DoD coordination in space programs. Ph.D. Thesis - Rand Graduate Inst.

    NASA Technical Reports Server (NTRS)

    Harris, E. D.

    1980-01-01

    The Space Test Program Standard Satellite (STPSS), a design proposed by the Air Force, and two NASA candidates, the Applications Explorer Mission spacecraft (AEM) and the Multimission Modular Spacecraft (MMS), were considered during the first phase. During the second phase, a fourth candidate was introduced, a larger, more capable AEM (L-AEM), configured by the Boeing Company under NASA sponsorship to meet the specifications jointly agreed upon by NASA and the Air Force. Total program costs for a variety of procurement options, each of which is capable of performing all of the Air Force Space Test Program missions during the 1980-1990 time period, were used as the principal measure for distinguishing among procurement options. Program cost does not provide a basis for choosing among the AEM, STPSS, and MMS spacecraft, given their present designs. The availability of the L-AEM spacecraft, or some very similar design, would provide a basis for minimizing the cost of the Air Force Space Test Program.

  4. The logistics management and coordination in procurement phase of organ transplantation.

    PubMed

    Genç, Ruhet

    2008-12-01

    The number of organ transplantation surgeries has increased particularly in the last decade due to technological and scientific advances in medicine. Despite this increase, many patients, however, remain in waiting lists for transplantation surgery. Main reasons for these waiting lists are that there are limited number of organ donations and specifically problems in the management of organ transplantation activities. An efficient management of the allocation and transportation of organs (in other words, logistics management of organ transplantation) are thus extremely important. The aim of the paper is to review current practices of logistics management in the procurement phase of organ transplantation. It initially reviews the organizational structures of the international and national coordination centres, which are founded to coordinate organ transplantation activities and to enhance collaboration among physicians and medical staff. The paper, then, focuses on the possible managerial problems encountered during the procurement phase of organ transplantation. With this respect, common transportation difficulties from global and local perspective are also analyzed. This paper tries to take attention to a systematic regard of the organ transplantation from logistics point of view, thus providing applicable solutions to managerial problems in terms of allocation and transportation of organs.

  5. Microprocessor Seminar, phase 2

    NASA Technical Reports Server (NTRS)

    Scott, W. R.

    1977-01-01

    Workshop sessions and papers were devoted to various aspects of microprocessor and large scale integrated circuit technology. Presentations were made on advanced LSI developments for high reliability military and NASA applications. Microprocessor testing techniques were discussed, and test data were presented. High reliability procurement specifications were also discussed.

  6. Proceedings: 1990 EPRI gas turbine procurement seminar

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDonald, B.L.; Miller, M.N.

    1991-06-01

    This seminar presents information that enables utilities to implement more cost-effective procurements for gas turbine and combined-cycle power generation equipment. A systematic approach to specification and permitting procedures can lower unit life-cycle cost. APPROACH. Thirty-two staff members from 25 utilities met in Danvers, Massachusetts, October 9--11, 1990. Speakers representing utilities, vendors, and EPRI contractors presented material on recent procurement and startup experiences, permitting considerations, specification strategy, bid evaluation techniques, and a vendor's perspective of utility procurements. KEY POINTS. The seminar focused on specification features, procurement procedures, and bid evaluation techniques designed to implement life-cycle cost-effective procurement consistent with the plantmore » mission. Speakers highlighted the following issues: Experiential case histories of recent procurements and startups, emphasizing how to design procurement procedures that improve plant operating economics; Current trends in permitting for NO{sub x} compliance and recent permitting experience; Quantifiable evaluations of vendors' bids for RAM-related characteristics; The means to obtain specifically desired but nonstandard equipment features.« less

  7. STP 4-06 Model-Based Technical Data in Procurement, 3D PDF Technology Data Demonstration Project. Phase 1 Summary

    DTIC Science & Technology

    2015-07-01

    O R G STP 4-06 MODEL-BASED TECHNICAL DATA IN PROCUREMENT 3D PDF TECHNOLOGY DATA DEMONSTRATION PROJECT PHASE 1 SUMMARY REPORT DL309T2...LMI’s ISO- certified quality management procedures. J U L Y 2 0 1 5 STP 4-06 MODEL-BASED TECHNICAL DATA IN PROCUREMENT 3D PDF TECHNICAL DATA...Based Technical Data ..................................................................................... 5 3D PDF Demonstration Team

  8. Transformation of fraud activities in procurement system in Indonesia

    NASA Astrophysics Data System (ADS)

    Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.

    2017-03-01

    E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.

  9. Standard spacecraft economic analysis. Volume 2: Findings and conclusions

    NASA Technical Reports Server (NTRS)

    Harris, E. D.; Large, J. P.

    1976-01-01

    The comparative program costs associated with use of various standardized spacecraft for Air Force space test program missions to be flown on the space shuttle were studied in two phases. In the first phase, a variety of procurement mixes composed of existing or programmed NASA standard spacecraft designs and an Air Force standard spacecraft design were considered. The second phase dealt with additional procurement options using an upgraded version of an existing NASA design. The results of both phases are discussed.

  10. 22 CFR 226.49 - USAID-Specific procurement requirements

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false USAID-Specific procurement requirements 226.49 Section 226.49 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.49 USAID...

  11. Cost effective nuclear commercial grade dedication

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maletz, J.J.; Marston, M.J.

    1991-01-01

    This paper describes a new computerized database method to create/edit/view specification technical data sheets (mini-specifications) for procurement of spare parts for nuclear facility maintenance and to develop information that could support possible future facility life extension efforts. This method may reduce cost when compared with current manual methods. The use of standardized technical data sheets (mini-specifications) for items of the same category improves efficiency. This method can be used for a variety of tasks, including: Nuclear safety-related procurement; Non-safety related procurement; Commercial grade item procurement/dedication; Evaluation of replacement items. This program will assist the nuclear facility in upgrading its procurementmore » activities consistent with the recent NUMARC Procurement Initiative. Proper utilization of the program will assist the user in assuring that the procured items are correct for the applications, provide data to assist in detecting fraudulent materials, minimize human error in withdrawing database information, improve data retrievability, improve traceability, and reduce long-term procurement costs.« less

  12. 13 CFR 121.407 - What are the size procedures for multiple item procurements?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Requirements for Government Procurement § 121.407 What are the size procedures for multiple item procurements? If a procurement calls for two or more specific end items or types of services with different size... multiple item procurements? 121.407 Section 121.407 Business Credit and Assistance SMALL BUSINESS...

  13. Notification: Methods for Procuring Supplies and Services Under Simplified Acquisition Procedures

    EPA Pesticide Factsheets

    Project #OA-FY15-0193, June 18, 2015. The EPA OIG plans to begin the preliminary research phase of auditing the methods used in procuring supplies and services under simplified acquisition procedures.

  14. 48 CFR 2804.602 - Federal Procurement Data System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data... close of the fourth quarter. Specific preparation procedures are contained in the FPDS Reporting Manual...

  15. 48 CFR 2804.602 - Federal Procurement Data System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data... close of the fourth quarter. Specific preparation procedures are contained in the FPDS Reporting Manual...

  16. Consortia for Known Good Die (KGD), phase 1

    NASA Astrophysics Data System (ADS)

    Andrews, Marshall; Carey, David; Fellows, Mary M.; Gilg, Larry; Murphy, Cindy; Noddings, Chad; Pitts, Greg; Rathmell, Claude; Spooner, Charles

    1994-02-01

    This report describes the results of Phase 1 of the Infrastructure for KGD program at MCC. The objective of the work is to resolve the issues for supplying and procuring Known Good Die (KGD) in a way that fosters industry acceptance and confidence in Application Specific Electronic Modules (ASEM's for military systems) and MultiChip Modules (MCM's for commercial systems). This report is divided into four sections. Section 1 describes the technical assessment of proposed industry approaches to KGD implementation. Section 2 of the report contains an outline for the plan for industry and government cooperation for the demonstration, validation, and implementation of KGD methodologies identified in this Phase 1 study. Section 3 of the report contains the industry-generated requirements for KGD implementation. Section IV of the report contains the KGD specifications for TAB and flip chip IC's.

  17. 22 CFR 201.22 - Procurement under public sector procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... procurement. Purchasing by brand or trade name or by a restrictive specification (proprietary procurement) may... by operating personnel, can be achieved through standardizing on a particular brand; (2...

  18. Development of a Procurement Management Framework in Ghana: A New Paradigm for Interdisciplinary Postgraduate Education

    ERIC Educational Resources Information Center

    Owusu-Manu, D.; Badu, E.; Edwards, D. J.

    2011-01-01

    Procurement in the corporate world is increasingly complex, multi-faceted and interdisciplinary. This paper explores existing knowledge specifications relating to procurement management competencies and proposes a new procurement management competency framework (PMCF) and a competency-based postgraduate programme for postgraduate students in…

  19. Project FIRES - Firefighters Integrated Response Equipment System. Volume 3: Protective Ensemble Design and Procurement Specification, Phase 1B

    NASA Technical Reports Server (NTRS)

    Abeles, F. J.

    1980-01-01

    Each of the subsystems comprising the protective ensemble for firefighters is described. These include: (1) the garment system which includes turnout gear, helmets, faceshields, coats, pants, gloves, and boots; (2) the self-contained breathing system; (3) the lighting system; and (4) the communication system. The design selection rationale is discussed and the drawings used to fabricate the prototype ensemble are provided. The specifications presented were developed using the requirements and test method of the protective ensemble standard. Approximate retail prices are listed.

  20. 17 CFR 200.13 - Executive Director.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AND ETHICS; AND INFORMATION AND REQUESTS Organization and Program Management General Organization... procurement regulations, enters into contracts, designates contracting officers, and makes procurement...-specific application of performance measures, procurement reforms, personnel reductions, financial...

  1. 23 CFR 172.5 - Methods of procurement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and ranked by the contracting agency using one of the following procedures: (1) Competitive negotiation. Contracting agencies shall use competitive negotiation for the procurement of engineering and... and selection phase. Alternatively, a formal procedure adopted by State Statute enacted into law prior...

  2. Extinction of chained instrumental behaviors: Effects of consumption extinction on procurement responding

    PubMed Central

    Thrailkill, Eric A.; Bouton, Mark E.

    2015-01-01

    Operant behavior is typically organized into sequences of responses that eventually lead to a reinforcer. Response elements can be categorized as those that directly lead to reward consumption (i.e., a consumption response), and those that lead to the opportunity to make the consumption response (i.e., a procurement response). These responses often differ topographically and in terms of the discriminative stimuli that set the occasion for them. We have recently shown that extinction of the procurement response acts to weaken the specific associated consumption response, and that active inhibition of the procurement response is required for this effect. To expand the analysis of the associative structure of chains, the present experiments asked the reverse question of whether extinction of consumption behavior results in a decrease in the associated procurement response in a discriminated heterogeneous chain. In Experiment 1, extinction of consumption alone led to an attenuation of the associated procurement response only when rats were allowed to make the consumption response in extinction. Exposure to the consumption stimulus alone was not sufficient to produce weakened procurement responding. In Experiment 2, rats learned two distinct heterogeneous chains; extinction of one consumption response specifically weakened the procurement response associated with it. The results add to evidence suggesting that rats learn a highly specific associative structure in behavior chains, and emphasize the role of learning response inhibition in extinction. PMID:26276367

  3. Extinction of chained instrumental behaviors: Effects of consumption extinction on procurement responding.

    PubMed

    Thrailkill, Eric A; Bouton, Mark E

    2016-03-01

    Operant behavior is typically organized into sequences of responses that eventually lead to a reinforcer. Response elements can be categorized as those that directly lead to reward consumption (i.e., a consumption response) and those that lead to the opportunity to make the consumption response (i.e., a procurement response). These responses often differ topographically and in terms of the discriminative stimuli that set the occasion for them. We have recently shown that extinction of the procurement response acts to weaken the specific associated consumption response, and that active inhibition of the procurement response is required for this effect. To expand the analysis of the associative structure of chains, in the present experiments we asked the reverse question: whether extinction of consumption behavior results in a decrease in the associated procurement response in a discriminated heterogeneous chain. In Experiment 1, extinction of consumption alone led to an attenuation of the associated procurement response only when rats were allowed to make the consumption response in extinction. Exposure to the consumption stimulus alone was not sufficient to produce weakened procurement responding. In Experiment 2, rats learned two distinct heterogeneous chains, and extinction of one consumption response specifically weakened the procurement response associated with it. The results add to the evidence suggesting that rats learn a highly specific associative structure in behavior chains, emphasizing the role of learning response inhibition in extinction.

  4. Possible Gravitational Anomalies in Quantum Materials. Phase 1: Experiment Definition and Design

    DTIC Science & Technology

    2007-02-01

    temperature achievable with the experiment at liquid nitrogen . The signal of the superconducting ring when decelerating from a mean rotational speed...temperatures below 50 K (see Figure 2.2-5). This experiments would require liquid He, as nitrogen solidifies at 63 K, therefore a temperature lowering... Using Government drawings, specifications, or other data included in this document for any purpose other than Government procurement does not in any way

  5. Michigan Department of Transportation statewide advanced traffic management system (ATMS) procurement evaluation - phase I : software procurement.

    DOT National Transportation Integrated Search

    2009-04-01

    This project evaluates the process that was followed by MDOT and other stakeholders for the acquisition : of new Advanced Traffic Management System (ATMS) software aiming to integrate and facilitate the : management of various Intelligent Transportat...

  6. Standard spacecraft economic analysis. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Harris, E. D.; Large, J. P.

    1976-01-01

    A study of the comparative program costs associated with use of various standardized spacecraft for Air Force space test program missions to be flown on the space shuttle during the 1980-1990 time period is reviewed. The first phase of the study considered a variety of procurement mixes composed of existing or programmed NASA standard spacecraft designs and a Air Force standard spacecraft design. The results were briefed to a joint NASA/Air Force audience on July 11, 1976. The second phase considered additional procurement options using an upgraded version of an existing NASA design. The results of both phases are summarized.

  7. Extinguishing agent for magnesium fire, phases 5 and 6

    NASA Astrophysics Data System (ADS)

    Beeson, H. D.; Tapscott, R. E.; Mason, B. E.

    1987-07-01

    This report documents the validation testing of the extinguishing system for metal fires developed as part of Phases 1 to 4. The results of this validation testing form the basis of information from which draft military specifications necessary to procure the agent and the agent delivery system may be developed. The developed system was tested against a variety of large-scale metal fire scenarios and the capabilities of the system were assessed. In addition the response of the system to storage and to changes in ambient conditions was tested. Results of this testing revealed that the developed system represented a reliable metal fire extinguishing system that could control and extinguish very large metal fires. The specifications developed for the agent and for the delivery system are discussed in detail.

  8. CAD/CAM data management needs, requirements and options

    NASA Technical Reports Server (NTRS)

    Lopatka, R. S.; Johnson, T. G.

    1978-01-01

    The requirements for a data management system in support of technical or scientific applications and possible courses of action were reviewed. Specific requirements were evolved while working towards higher level integration impacting all phases of the current design process and through examination of commercially marketed systems and related data base research. Arguments are proposed for varied approaches in implementing data base systems ranging from no action necessary to immediate procurement of an existing data base management system.

  9. 13 CFR 125.15 - What requirements must an SDVO SBC meet to submit an offer on a contract?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... corresponding to the NAICS code assigned to the contract, provided: (A) For a procurement having a revenue-based... to the contract; or (B) For a procurement having an employee-based size standard, the procurement... specific contract: (1) It is an SDVO SBC; (2) It is small under the NAICS code assigned to the procurement...

  10. Hospital-based expert model for health technology procurement planning in hospitals.

    PubMed

    Miniati, R; Cecconi, G; Frosini, F; Dori, F; Regolini, J; Iadanza, E; Biffi Gentili, G

    2014-01-01

    Although in the last years technology innovation in healthcare brought big improvements in care level and patient quality of life, hospital complexity and management cost became higher. For this reason, necessity of planning for medical equipment procurement within hospitals is getting more and more important in order to sustainable provide appropriate technology for both routine activity and innovative procedures. In order to support hospital decision makers for technology procurement planning, an expert model was designed as reported in the following paper. It combines the most widely used approaches for technology evaluation by taking into consideration Health Technology Assessment (HTA) and Medical Equipment Replacement Model (MERM). The designing phases include a first definition of prioritization algorithms, then the weighting process through experts' interviews and a final step for the model validation that included both statistical testing and comparison with real decisions. In conclusion, the designed model was able to provide a semi-automated tool that through the use of multidisciplinary information is able to prioritize different requests of technology acquisition in hospitals. Validation outcomes improved the model accuracy and created different "user profiles" according to the specific needs of decision makers.

  11. The effect of inhalational anaesthesia during deceased donor organ procurement on post-transplantation graft survival.

    PubMed

    Perez-Protto, S; Nazemian, R; Matta, M; Patel, P; Wagner, K J; Latifi, S Q; Lebovitz, D J; Reynolds, J D

    2018-03-01

    Many deceased by neurologic criteria donors are administered inhalational agents during organ recovery surgery-a process that is characterised by warm and cold ischaemia followed by warm reperfusion. In certain settings, volatile anaesthetics (VA) are known to precondition organs to protect them from subsequent ischaemia-reperfusion injury. As such, we hypothesised that exposure to VA during organ procurement would improve post-graft survival. Lifebanc (organ procurement organisation [OPO] for NE Ohio) provided the investigators with a list of death by neurologic criteria organ donors cared for at three large tertiary hospitals in Cleveland between 2006 and 2016-details about the surgical recovery phase were extracted from the organ donors' medical records. De-identified data on graft survival were obtained from the United Network for Organ Sharing (UNOS). The collated data underwent comparative analysis based on whether or not VA were administered during procurement surgery. Records from 213 donors were obtained for analysis with 138 exposed and 75 not exposed. Demographics, medical histories, and organ procurement rates were similar between the two cohorts. For the primary endpoint, there were no significant differences observed in either early (30-day) or late (five-year) graft survival rates for kidney, liver, lung, or heart transplants. Our findings from this retrospective review of a relatively small cohort do not support the hypothesis that the use of VA during the surgical procurement phase improves graft survival. Reviews of larger datasets and/or a prospective study may be required to provide a definitive answer.

  12. 40 CFR 31.36 - Procurement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... procurements, contain features which unduly restrict competition. The description may include a statement of... requirements of a procurement. The specific features of the named brand which must be met by offerors shall be...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American...

  13. 40 CFR 31.36 - Procurement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... procurements, contain features which unduly restrict competition. The description may include a statement of... requirements of a procurement. The specific features of the named brand which must be met by offerors shall be...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American...

  14. 40 CFR 31.36 - Procurement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... procurements, contain features which unduly restrict competition. The description may include a statement of... requirements of a procurement. The specific features of the named brand which must be met by offerors shall be...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American...

  15. Operating a petabyte class archive at ESO

    NASA Astrophysics Data System (ADS)

    Suchar, Dieter; Lockhart, John S.; Burrows, Andrew

    2008-07-01

    The challenges of setting up and operating a Petabyte Class Archive will be described in terms of computer systems within a complex Data Centre environment. The computer systems, including the ESO Primary and Secondary Archive and the associated computational environments such as relational databases will be explained. This encompasses the entire system project cycle, including the technical specifications, procurement process, equipment installation and all further operational phases. The ESO Data Centre construction and the complexity of managing the environment will be presented. Many factors had to be considered during the construction phase, such as power consumption, targeted cooling and the accumulated load on the building structure to enable the smooth running of a Petabyte class Archive.

  16. Effects of procurement practices on quality of medical device or service received: a qualitative study comparing countries.

    PubMed

    Lingg, Myriam; Wyss, Kaspar; Durán-Arenas, Luis

    2016-08-08

    We know little about how procurement of a high-risk medical device (HRMD) affects clinical practice and outcomes. In health systems in high-income countries, and specifically those that maintain a national arthroplasty registry, procurement decisions are frequently guided by long-term clinical results, with the goal of ensuring at least standard quality of HRMDs. But in countries like Mexico, decision-making is often dominated by lowest acquisition price. We set out to study the impact of procurement for orthopaedic HRMDs on clinical procedures and outcomes. We based our qualitative study on 59 in-depth interviews with stakeholders from Mexico, Switzerland, Germany, and UK: orthopaedic specialists, government officials, other experts, and social security system managers or administrators. We took a healthcare delivery approach to capturing and comparing factors that affected the regulations of HRMDs and procurement processes, and to understanding connections between procurement and clinical practice. Our findings demonstrate for procurement processes that the three European countries compared to Mexico don't have similar concerns with regards to their procurement processes. Deficiencies of procurement regulations and practices identified from representatives in Mexico were almost absent in European countries. We identified three areas of deficiency: 1) HRMD regulations based on insufficiently robust clinical evidence (mainly noted by European countries); 2) Follow-up on Health Technology Assessments is inadequate (noted by Mexico) and methodology not always good enough (noted by European countries); and, 3) Lowest-acquisition price often guides procurement decisions and thus may not align with needs of clinical procedures (noted by Mexico and some European countries). Procurement processes for orthopaedic HRMDs may have an impact on clinical procedures and outcomes. A favourable approach is one where orthopaedic specialists are parties to the procurement process, and post-market surveillance data informs decision-making. Actors in the procurement process can improve their impact on clinical procedures and outcomes by developing specific strategies that better align the needs of both, procurement and clinical procedures.

  17. 13 CFR 124.513 - Under what circumstances can a joint venture be awarded an 8(a) contract?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...; and (ii)(A) For a procurement having a revenue-based size standard, the procurement exceeds half the... an employee-based size standard, the procurement exceeds $10 million; (2) For sole source and... the purpose of performing one or more specific 8(a) contracts. (2) A joint venture agreement is...

  18. Development of simulation computer complex specification

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The Training Simulation Computer Complex Study was one of three studies contracted in support of preparations for procurement of a shuttle mission simulator for shuttle crew training. The subject study was concerned with definition of the software loads to be imposed on the computer complex to be associated with the shuttle mission simulator and the development of procurement specifications based on the resulting computer requirements. These procurement specifications cover the computer hardware and system software as well as the data conversion equipment required to interface the computer to the simulator hardware. The development of the necessary hardware and software specifications required the execution of a number of related tasks which included, (1) simulation software sizing, (2) computer requirements definition, (3) data conversion equipment requirements definition, (4) system software requirements definition, (5) a simulation management plan, (6) a background survey, and (7) preparation of the specifications.

  19. 48 CFR 1852.217-72 - Phased acquisition using progressive competition down-selection procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to and including the date upon which Phase 2 proposals are requested. Any such changes in evaluation... procurement using a progressive competition down-selection technique between phases. In this technique, two or more contractors will be selected for Phase 1. It is expected that the single contractor for Phase 2...

  20. 48 CFR 1852.217-72 - Phased acquisition using progressive competition down-selection procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Phase 2 synopsis, and NASA will provide that source to all the material furnished to the Phase 1... the date upon which Phase 2 proposals are requested. Any such changes in evaluation factors will not... procurement using a progressive competition down-selection technique between phases. In this technique, two or...

  1. 48 CFR 1852.217-72 - Phased acquisition using progressive competition down-selection procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Phase 2 synopsis, and NASA will provide that source to all the material furnished to the Phase 1... the date upon which Phase 2 proposals are requested. Any such changes in evaluation factors will not... procurement using a progressive competition down-selection technique between phases. In this technique, two or...

  2. Selection, production, procurement, and use of preservative treated wood : supplementing federal specification TT-W-571

    Treesearch

    Lee R. Gjovik; Roy H. Baechler

    1977-01-01

    This report has been prepared to supplement Federal Specification TT-W-571 “Wood Preservation: Treating Practices.” developed for the General Services Administration by the U.S. Department of Agriculture, Forest Service, Forest Products Laboratory, the Specification is used by Federal agencies, State agencies, and private users in procuring preservative-treated wood....

  3. Challenges in developing e-government for good governance in North Sumatra

    NASA Astrophysics Data System (ADS)

    Siahaan, AY

    2017-01-01

    E-government as one form of public administration reform in Indonesia is increasingly related to the pursuance of good governance. This paper examines the relationship between of e-government and good governance by utilizing the case study design on the implementation of e-procurement in North Sumatra. It reveals centrality of local politics and business culture in understanding resistances of both local government officials and local business which creates loopholes’ for the practice of ‘bad governance’ in all phases of e-procurement in North Sumatra province. Data transparency does not equate and guarantee the realization of good governance. Public knowledge and understanding on government decision making processes and accountability (process and policy transparency) are central to achieve good governance through e-procurement. E-procurement system does not automatically change organizational and working culture of the implementers and suppliers. This paper provides insight to the attitude and the perception of private sector engage in e-procurement towards government in implementing e-government. Resistance, digital divide and local politics interrelatedly obstruct the realization of pursuing good governance through e-procurement.

  4. 48 CFR 2901.603-71 - Contracting Officer's Technical Representatives (COTR).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maintained by the COTR; (5) Reference to meeting applicable requirements for ethics, procurement integrity... training specifically in procurement ethics, either through courses offered periodically by the Department...

  5. Domestic mobile satellite systems in North America

    NASA Technical Reports Server (NTRS)

    Wachira, Muya

    1990-01-01

    Telest Mobile Inc. (TMI) and the American Mobile Satellite Corporation (AMSC) are authorized to provide mobile satellite services (MSS) in Canada and the United States respectively. They are developing compatible systems and are undertaking joint specification and procurement of spacecraft and ground segment with the aim of operational systems by late 1993. Early entry (phase 1) mobile data services are offered in 1990 using space segment capacity leased from Inmarsat. Here, an overview is given of these domestic MSS with an emphasis on the TMI component of the MSAT systen.

  6. 19 CFR 177.28 - Issuance of advisory rulings and final determinations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) ADMINISTRATIVE RULINGS Government Procurement; Country-of...(b)(5) (relating to a specific procurement) will be considered by Customs before all other requests...

  7. AdaNET Dynamic Software Inventory (DSI) prototype component acquisition plan

    NASA Technical Reports Server (NTRS)

    Hanley, Lionel

    1989-01-01

    A component acquisition plan contains the information needed to evaluate, select, and acquire software and hardware components necessary for successful completion of the AdaNET Dynamic Software Inventory (DSI) Management System Prototype. This plan will evolve and be applicable to all phases of the DSI prototype development. Resources, budgets, schedules, and organizations related to component acquisition activities are provided. A purpose and description of a software or hardware component which is to be acquired are presented. Since this is a plan for acquisition of all components, this section is not applicable. The procurement activities and events conducted by the acquirer are described and who is responsible is identified, where the activity will be performed, and when the activities will occur for each planned procurement. Acquisition requirements describe the specific requirements and standards to be followed during component acquisition. The activities which will take place during component acquisition are described. A list of abbreviations and acronyms, and a glossary are contained.

  8. Joint Tactical Radio System Handheld, Manpack, and Small Form Fit Radios (JTRS HMS)

    DTIC Science & Technology

    2013-12-01

    requisitions through the Standard Army Supply System ( SASS ). All radios procured under the Full Rate Production (FRP) phase that become unserviceable...will be turned-in to TYAD through the SASS . Radios will be returned to the original equipment manufacturer vendor for warranty repair, or replacement...procure sustainment spares to replace unserviceable radios and ancillary items requisitioned through SASS , operations, maintenance, training

  9. Maintenance Training Equipment: Design Specification Based on Instructional System Development. Revision

    DTIC Science & Technology

    1984-12-01

    model pr, vides a method for communicating a specific training equipment design to the procurement office after A"~- ISD ana lysis has est~blished a...maintenance trainer has been identified. The model provides a method by which a training equipment design can be communicated to the System Project Office...ensure * ase of development of procurement specifications and consistency between different documented designs. A completed application of this maodel

  10. Technology-neutral green procurement in practice - an example from Swedish waste management.

    PubMed

    Arvidsson, Anders; Stage, Jesper

    2012-05-01

    Green public procurement has been criticized for its excessive reliance on detailed technology specifications, which can distort incentives in the short term and discourage innovation in the longer term. Economists therefore tend to prefer technology-neutral procurement, which rewards outcomes rather than technologies. However, technology-neutral procurement can also be problematic in practice. The present study investigated green public procurement of waste management, a rapidly growing field. In one of the most sophisticated models for technology-neutral procurement applied in Sweden in recent years, different environmental impacts were assigned weights, but no weight was given to the particular technology employed. Even here, however, potential inefficiencies were found where the scoring rule could have led to arbitrary, and presumably unwanted, outcomes. Explicitly assigning monetary surcharges to desirable and undesirable environmental effects may be a better way to reach environmental targets.

  11. Use of Commercial ’Off-the-Shelf’ Equipment in Military Aircraft

    DTIC Science & Technology

    1976-05-01

    never been intended as a procurement document. The airline industry benefits from the standarization of equipment. Aeronautical Radio Inc. (ARINC) is...are not intended for nor are they suitable for use as procurement specifications. 2. Airframe manufacturers and commercial airlines purchase avionics...may be suitable for military procurements but a careful review must be made to ensure that the performance and environmental testing specified is

  12. Extinction of Chained Instrumental Behaviors: Effects of Procurement Extinction on Consumption Responding

    PubMed Central

    Thrailkill, Eric A.; Bouton, Mark E.

    2015-01-01

    Instrumental behavior often consists of sequences or chains of responses that minimally include procurement behaviors that enable subsequent consumption behaviors. In such chains, behavioral units are linked by access to one another and eventually to a primary reinforcer, such as food or a drug. The present experiments examined the effects of extinguishing procurement responding on consumption responding after training of a discriminated heterogeneous instrumental chain. Rats learned to make a procurement response (e.g., pressing a lever) in the presence of a distinctive discriminative stimulus; making that response led to the presentation of a second discriminative stimulus that set the occasion for a consumption response (e.g., pulling a chain), which then produced a food-pellet reinforcer. Experiment 1 showed that extinction of either the full procurement-consumption chain or procurement alone weakened the consumption response tested in isolation. Experiment 2 replicated the procurement extinction effect and further demonstrated that the opportunity to make the procurement response, as opposed to simple exposure to the procurement stimulus alone, was required. In Experiment 3, rats learned 2 distinct discriminated heterogeneous chains; extinction of 1 procurement response specifically weakened the consumption response that had been associated with it. The results suggest that learning to inhibit the procurement response may produce extinction of consumption responding through mediated extinction. The experiments suggest the importance of an associative analysis of instrumental behavior chains. PMID:25915751

  13. 48 CFR 1852.217-72 - Phased acquisition using progressive competition down-selection procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... responding to the Phase 2 synopsis, and NASA will provide that source to all the material furnished to the... to and including the date upon which Phase 2 proposals are requested. Any such changes in evaluation... procurement using a progressive competition down-selection technique between phases. In this technique, two or...

  14. Tank farms pump critical characteristic and specification guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Titzler, P.A.

    The Design Authority group for Tank Farms, in conjunction with the Construction Projects organization, have recognized that there is a need to provide consistency in the procurement and testing of pumps and to assure that known critical attributes and features are included with each pump order as well as to reduce potential confusion by pump suppliers. As a result, a panel of pump experts representing Lockheed Martin Hanford Company (LMHC), Fluor Daniel Northwest (FDNW), Numatec Hanford Corporation (NHC), SGN Eurisys Services Corporation (SESC), and ARES Corporation has been assembled to prepare a guide for pump specifications. This document contains themore » consensus listing of critical characteristics and procurement recommendations of the panel. It is intended to be used as a guide for future pump procurement activities. If followed, it will help reduce cleanup costs at the Hanford Site and promote prompt approval of pumping system designs and procurement specifications. Alternate criteria may be specified on a case by case basis if deviation from the requirements contained herein is merited due to special circumstances.« less

  15. Recommendations and Ongoing Efforts within the NASA Data Quality Working Group

    NASA Astrophysics Data System (ADS)

    Moroni, D. F.; Ramapriyan, H.; Bagwell, R.; Downs, R. R.

    2015-12-01

    Since its inception in March 2014, the NASA Data Quality Working Group (DQWG) has procured a set of 12 high level recommendations which had been sifted from and aggregated from a prioritized subset of nearly 100 unique recommendations spanning four unique data quality management phases and distributed between two actionable categories. The four data quality management phases as identified by the DQWG are: 1. Capturing (i.e., deriving, collecting and organizing the information), 2. Describing (i.e., documenting and procuring the information for public consumption), 3. Facilitating Discovery (i.e., publishing and providing access to the information), and 4. Enabling Use (i.e., enhancing the utility of the information). Mapping each of our recommendations to one or more of the above management phases is intended to enable improved assessment of cost, feasibility, and relevancy to the entities responsible for implementing such recommendations. The DQWG further defined two distinct actionable categories: 1) Data Systems and 2) Science. The purpose of these actionable categories is to define specifically who is responsible for the implementation and adherence toward these recommendations; we refer to the responsible entities as the "actionees". Here we will summarize each of the high level recommendations along with their corresponding management phases and actionees. We will present what has recently been identified as our set of "low-hanging fruit" recommendations, which are intended for near-term implementation. Finally, we will present the status and motivation for continuing and future planned activities, which include but are not limited to: engaging inter-agency and international communities, more direct feedback from Earth observation missions, and mapping of "low-hanging fruit" recommendations to existing solutions.

  16. A Phase II Immunotherapeutic Trial: Combination Androgen Ablative Therapy Treatment for Advanced Prostate Cancer

    DTIC Science & Technology

    2008-03-01

    two study statisticians; d) the filing of an investigator IND with the FDA; e) procurement of local IRB approvals; f) procurement of FDA-approval to...compromising the interpretation of outcome data pertaining to the treatment of patients with local or advanced prostate cancer receiving treatment on...patients prior treatment (radiation or cryotherapy ) • 1 patient taking Saw Palmetto (before criteria changed) • 5 patients taking Proscar/Avodart • 2

  17. 48 CFR 9904.403-60 - Illustrations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING... Illustrative allocation bases Staff management or specific activities: 1. Personnel management 1. Number of.... Marketing policies 5. Sales, segment marketing costs. Central payments or accruals: 1. Pension expenses 1...

  18. End-Users' Voice in EHR Selection: Development of a Usability Questionnaire for Demonstrations in Procurement (DPUQ).

    PubMed

    Tyllinen, Mari; Kaipio, Johanna; Lääveri, Tinja; Nieminen, Marko

    2017-01-01

    This paper describes the development of a questionnaire for evaluating usability during EHR system procurement (DPUQ). Established usability questionnaires can be used to gather user feedback after using the systems. However, during procurement, experimenting with real system use is practical only with a limited number of system candidates. There is a need for less resource-demanding usability evaluation in the early stages of procurement in cases with several vendors. DPUQ has been designed for usability evaluation by end-users during special scenario-based vendor demonstrations. The questionnaire includes three sets of questions to be used during and after the vendor demonstration. DPUQ delivers specific usability scores and can be used to compare system candidates in procurement complementing other evaluation methods.

  19. The impact of e-Procurement practice in Indonesia government: A Preliminary Study (The case of Electronic Procurement Service at Bekasi District)

    NASA Astrophysics Data System (ADS)

    Candra, S.; E Gunawan, F.

    2017-01-01

    In digital economy, government of Indonesia uses the internet to deliver services and to communicate with citizens and organizations. One of applications are e-Procurement and LPSE is a unit to hold the service system of e-Procurement. Procurement of goods and services electronically in addition will increase transparency and accountability, improve market access and healthy competition, as well as improving the efficiency of the procurement process. Based on the background and specific objectives to be achieved, then the research will be viewed from e-Marketplace participation, Trust and its impact on the performance of existing procurement within the institution. Methods of data analysis used in this research is by using analysis of Structural Equation Modelling (SEM) by using the program Partial Least Square (PLS) to examine the relationship between variables. The population used in this study is an enterprise as well as other clients using the system LPSE Bekasi District. There are three part in this study population, namely the provision of a company, customer, and supplier of LPSE users amounted to 60 users. From data analysis, there are one hypothesis that rejected. The implication of this study are implementation of e-procurement and e-marketplace participation giving impact to procurement performance.

  20. NASA/MSFC Large Stretch Press Study

    NASA Technical Reports Server (NTRS)

    Choate, M. W.; Nealson, W. P.; Jay, G. C.; Buss, W. D.

    1985-01-01

    The purpose of this study was to: A. assess and document the advantages/disadvantages of a government agency investment in a large stretch form press on the order of 5000 tons capacity (per jaw); B. develop a procurement specification for the press; and C. provide trade study data that will permit an optimum site location. Tasks were separated into four major elements: cost study, user survey, site selection, and press design/procurement specification.

  1. 33 CFR 203.21 - Disaster preparedness responsibilities of non-Federal interests.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... burrowing animals, and longer term activities such as repair or replacement of structural components (e.g., culverts) of the project. (b) Procurement/stockpiling. Procurement and stockpiling of sandbags, pumps, and... control projects during crisis situations is a non-Federal responsibility. Specific plans should be...

  2. 75 FR 71562 - Defense Federal Acquisition Regulation Supplement; Contract Authority for Advanced Component...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... Development or Prototype Units (DFARS Case 2009-D034) AGENCY: Defense Acquisition Regulations System... the procurement of prototype units. The DFARS implementation places specific limits, in accordance... components or the procurement of prototype units. IV. Paperwork Reduction Act The Paperwork Reduction Act...

  3. History of deceased organ donation, transplantation, and organ procurement organizations.

    PubMed

    Howard, Richard J; Cornell, Danielle L; Cochran, Larry

    2012-03-01

    The historical development of deceased organ donation, transplantation, and organ procurement organizations is reviewed. The concept of transplantation, taking parts from one animal or person and putting them into another animal or person, is ancient. The development of organ transplantation brought on the need for a source of organs. Although many early kidney transplants used kidneys from living donors, these donors could not satisfy the ever-growing need for organs, and extrarenal organs were recovered only from deceased donors. This need for organs to satisfy the great demand led to specialized organizations to identify deceased donors, manage them until recovery occurred, and to notify transplant centers that organs were available for their patients. The functions of these organ procurement organizations expanded to include other required functions such as education, accounting, and compliance with state and federal requirements. Because of the shortage of organs relative to the demand, lack of a unified organ allocation system, the perception that organs are a national resource and should be governed by national regulations, and to improve results of organ procurement organizations and transplant centers, the federal government has regulated virtually all phases of organ procurement and transplantation.

  4. Defense Communications Agency Cost and Planning Factors Manual. Revised

    DTIC Science & Technology

    1983-03-01

    the Time-Phased Fiscal Year Funding Schedule. Using estimated leadtimes required for each identifiable milestone, estimate the funding to be incurred...for each fiscal year, making sure to back off the time required for the conceptual phase, the procurement phase, and the training and operational...39-1 (To be published later) 40. FISCAL -YEAR TIME PHASING OF COST ESTIMATE ........... 40-1 (To be published later) 41. DISCOUNTING

  5. 78 FR 18325 - Defense Transportation Regulation, Part IV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... received in connection with the Defense Personal Property Program (DP3) Phase III Direct Procurement Method... at http://www.transcom.mil/dtr/part-iv/phaseiii.cfm (DPM SECTION). All identified changes will be... Defense Personal Property System (DPS) Phase III programming projected for FY17. FOR FURTHER INFORMATION...

  6. Statistical analysis of the Nb3Sn strand production for the ITER toroidal field coils

    NASA Astrophysics Data System (ADS)

    Vostner, A.; Jewell, M.; Pong, I.; Sullivan, N.; Devred, A.; Bessette, D.; Bevillard, G.; Mitchell, N.; Romano, G.; Zhou, C.

    2017-04-01

    The ITER toroidal field (TF) strand procurement initiated the largest Nb3Sn superconducting strand production hitherto. The industrial-scale production started in Japan in 2008 and finished in summer 2015. Six ITER partners (so-called Domestic Agencies, or DAs) are in charge of the procurement and involved eight different strand suppliers all over the world, of which four are using the bronze route (BR) process and four the internal-tin (IT) process. In total more than 500 tons have been produced including excess material covering losses during the conductor manufacturing process, in particular the cabling. The procurement is based on a functional specification where the main strand requirements like critical current, hysteresis losses, Cu ratio and residual resistance ratio are specified but not the strand production process or layout. This paper presents the analysis on the data acquired during the quality control (QC) process that was carried out to ensure the same conductor performance requirements are met by the different strand suppliers regardless of strand design. The strand QC is based on 100% billet testing and on applying statistical process control (SPC) limits. Throughout the production, samples adjacent to the strand pieces tested by the suppliers are cross-checked (‘verified’) by their respective DAs reference labs. The level of verification was lowered from 100% at the beginning of the procurement progressively to approximately 25% during the final phase of production. Based on the complete dataset of the TF strand production, an analysis of the SPC limits of the critical strand parameters is made and the related process capability indices are calculated. In view of the large-scale production and costs, key manufacturing parameters such as billet yield, number of breakages and piece-length distribution are also discussed. The results are compared among all the strand suppliers, focusing on the difference between BR and IT processes. Following the completion of the largest Nb3Sn strand production, our experience gained from monitoring the execution of the QC activities and from auditing the results from the measurements is summarised for future superconducting strand material procurement activities.

  7. The learning curves in living donor hemiliver graft procurement using small upper midline incision.

    PubMed

    Ikegami, Toru; Harimoto, Norifumi; Shimokawa, Masahiro; Yoshizumi, Tomoharu; Uchiyama, Hideaki; Itoh, Shinji; Okabe, Norihisa; Sakata, Kazuhito; Nagatsu, Akihisa; Soejima, Yuji; Maehara, Yoshihiko

    2016-12-01

    The learning curve for performing living donor hemiliver procurement (LDHP) via small upper midline incision (UMI) has not been determined. Living donors (n=101) who underwent LDHP via UMI were included to investigate the learning curve using cumulative sum analysis. The cumulative sum analysis showed that nine cases for right lobe (case #23) and 19 cases for left lobe (case #32 in the whole series) are needed for stable and acceptable surgical outcomes in LDHP via UMI. The established phase (n=69, since case #33) had a significantly shorter operative time, a smaller incision size, and less blood loss than the previous learning phase (n=32, serial case number up to the last 19th left lobe case). Multivariate analysis showed that the learning phase, high body mass index ≥25 kg/m 2 , and left lobe graft procurement are the factors associated with surgical events including operative blood loss ≥400 mL, operative time ≥300 minutes, or surgical complications ≥Clavien-Dindo grade II. There is an obvious learning curve in performing LDHP via UMI, and 32 cases including both 19 cases for left lobe and nine cases for right lobe are needed for having stable and acceptable surgical outcomes. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  8. Computerized engineering logic for procurement and dedication processes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tulay, M.P.

    1996-12-31

    This paper summarizes the work performed for designing the system and especially for calculating on-line expected performance and gives some significant results. In an attempt to better meet the needs of operations and maintenance organizations, many nuclear utility procurement engineering groups have simplified their procedures, developed on-line tools for performing the specification of replacement items, and developed relational databases containing part-level information necessary to automate the procurement process. Although these improvements have helped to reduce the engineering necessary to properly specify and accept/dedicate items for nuclear safety-related applications, a number of utilities have recognized that additional long-term savings can bemore » realized by integrating a computerized logic to assist technical procurement engineering personnel.« less

  9. E-Procurement, from Project to Practice: Empirical Evidence from the French Public Sector

    NASA Astrophysics Data System (ADS)

    Beauvallet, Godefroy; Boughzala, Younès; Assar, Saïd

    Public procurement constitutes a significant portion of national PIB in all countries and electronic platforms for supporting public transactions are an important application of e-government. In France, new regulations since 2005 are pushing public and private actors to adopt electronic means for handling all steps of the purchase process in public organisations. Based on quantitative and qualitative surveys made between 2005 and 2008, this chapter presents the general topic of e-procurement and specifically discusses the problem of e-procurement adoption in public institutions in France. The conclusions of these investigations spanning a three years period, are that public e-procurement is constantly progressing, although difficulties related to insufficient technical skills and the complexity of the juridical context hinder seriously its full adoption. They also show that a digital and an organisational divide is appearing between big administrations which have the adequate resources and skills to fully adopt e-procurement, and small administration (i.e. local authorities) which are still reluctant or unable to conduct a purchase in a digital manner.

  10. NASA's Electronic Procurement System and the Impact on Small Business

    NASA Technical Reports Server (NTRS)

    Dozier, Ken

    1998-01-01

    Three workshops, held in Lancaster, Orange County and Compton, were produced by the Los Angeles Regional Technology Alliance (LARTA) and NASA Far West Technology Transfer Center (FWRTTC). The workshops were held on December 12, 1997, February 5, 1998, and March 30, 1998, respectively. The purpose behind these workshops was to spread information regarding NASA procurement opportunities to small businesses in the region. This was accomplished by inviting economic and business development organizations to the three workshops, presenting NASA procurement resources to them, and asking them to distribute this information to the small businesses in their communities. With the assistance of LARTA, marketing and publicity in the form of direct mail, telemarketing, and promotion via a web site was implemented to publicize the workshops. These methods were remarkably effective because they enabled the workshops to attain its full capacity. Further publicity was provided by Wendy Reed of Valley Focus Magazine, an Antelope Valley Magazine aimed at business people. Her article entitled, "Doing Business with the Government" recapped the Lancaster workshop that she had attended and made references to several presentations. In the article, she discussed selling to the government via electronic commerce, and specifically mentioned Robert Medina, the NASA Dryden Small Business Specialist, as a contact person for those interested in pursuing procurement opportunities. The feedback provided by the participants is illustrated by the enclosed graphs and charts. These figures represent the number of participants who have frequented web sites presented at workshops, specifically the NASA procurement resources, and how extensive information dissemination was. Input from participants was favorable and encouraged more NASA Dryden workshops directly to the small business communities. There was an overwhelming response to the benefit of the NASA procurement opportunities presented at the workshops. Ninety-nine percent of participants who responded to surveys expressed that the NASA procurement information was beneficial. By the fifth month after the start of the workshops, NASA procurement resource inquiries peaked at 100%. Also during this time, 100% of respondents to a survey mentioned that they had passed along information from workshops to other small businesses or organizations that could benefit from it. These results indicate successful implementation of the Dryden Workshops. The objective of spreading NASA procurement opportunities throughout small businesses in the region was achieved through the three workshops. In conclusion, we recommend that further NASA procurement workshops be funded to continue the education and outreach that has been started. We also feel that in addition to targeting economic development service providers, Dryden procurement should also be provided directly to small business communities.

  11. Survey of U.S. Organ Procurement Organizations Regarding Pediatric Organ Donor Management.

    PubMed

    Ream, Robert S; Armbrecht, Eric S

    2016-10-01

    To describe the current practice of pediatric organ donor management in the United States for donors declared dead based upon neurologic criteria. The study directs particular attention to how pediatric donors are defined, the use of donor management guidelines, the use of donor management goals, and the involvement of pediatric critical care or transplantation expertise. Cross-sectional observational study using a web-based survey and follow-up telephone interview with respondents from U.S. organ procurement organizations. The study also incorporated organ procurement organization-specific data on organ yield for the 4-year period (2010-2013) preceding the study. The 58 U.S. organ procurement organizations. Respondents chosen by each organ procurement organization. None. All 58 U.S. organ procurement organizations participated in the study. Fifty-two respondents (90%) indicated that their organ procurement organization distinguished pediatric from adult donors resulting in 28 unique pediatric definitions. Thirty-nine organ procurement organizations utilized some form of written pediatric management guidelines, and 27 (47%) maintained pediatric donor management goals; compliance was infrequently monitored for both guidelines (28%) and goals (33%). A pediatric intensivist was always or usually involved in pediatric donor management at 47 organ procurement organizations (81%); transplant/organ recovery surgeons were always or usually involved at 12 organ procurement organizations (21%). There was an increase in the number of organs transplanted per donor among donors 11-17 years old for organ procurement organizations that used donor management goals for the duration of the period studied (p < 0.01). There was also an increase in the ratio of observed/expected organs transplanted among donors of 0-10 years old for organ procurement organizations that always or usually consulted a transplant/organ recovery surgeon (p = 0.02) although this did not reach our threshold for statistical significance.. There is little consensus among organ procurement organizations regarding the definition of "pediatric" during organ donor management. Most organ procurement organizations employ written pediatric guidelines and use pediatric intensive care physicians for assistance in managing these donors. There is a positive association between the use of donor management goals and organ yield among pediatric donors in the 11- to 17-year age group.

  12. NASA Procurement Career Development Program

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.

  13. Sequential improvements in organ procurement increase the organ donation rate.

    PubMed

    Billeter, Adrian T; Sklare, Seth; Franklin, Glen A; Wright, Jerry; Morgan, Gary; O'Flynn, Paul E; Polk, Hiram C

    2012-11-01

    Organ demand exceeds availability of transplantable organs. Organ procurement continues to suffer from failures to identify potential donors, inability to obtain consent for donation, as well as failures to retrieve certain organs as donor demographics change. The purpose of this article is to propose how sequentially introduced measures can increase organ donation rates as well as improve organ procurement. We analysed the effect of stepwise improvements in the organ procurement process patients in a university-based surgical intensive care unit over a 20-year period. We related newly introduced measures in the organ retrieval process with changes in donation rates. We specifically targeted these three main steps in the donation process: donor identification, conversion of potential donors to actual donors, and organ protection during the procurement process. Finally, we assessed the effect of the same measures on organ procurement after introduction in other hospitals of the same organ procurement region. Introduction of quality improvement steps increased all of the observed parameters. The number of organ donors was stabilised due to a better identification of potential donors, a major increase in conversion from potential to actual donors, and an increase in extended criteria donor. Improvements in organ protection led to higher rates of organs transplanted per donor and increased recovery of lungs and hearts despite increasing donor age. The same measures were introduced successfully in other hospitals in our organ procurement region. Sequential improvements in organ procurement can increase the yield of retrieved organs. The same measures can be applied to other hospitals and lead to comparable improvements in organ donation. Published by Elsevier Ltd.

  14. A Quest for Excellence. Appendix

    DTIC Science & Technology

    1986-06-01

    the Joint Staff should be removed to permit the Chairman a staff sufficient to discharge his responsibilities. The Secretary of Defense should direct...better coordinated among DoD agencies and Congress. Guidelines must be developed to remove undesirable duplication of official effort and, when...specifically for commercial overall procurement system, with particular procurement are inconsistent and ineffective, attention given to the removal

  15. Materiel Acquisition Management Guide

    DTIC Science & Technology

    1980-02-11

    Ii-n manager and his staff, hiqhlighted by the specific de - tails provided in tabbea one-sheet descriptions. • Part III - Areas of Aco-uisition...support program requirements? Support and Test Equipment (S/TE)? Spares Support (SS)? Storage and transportation ? training? o Have test and...PACKAGES PROCUREMENT PLANNING/ PROCUREMENT pLANS TEST AND EVALUATION - PLANNING PRODUCIBILITY ENGINEERING AND TRAINING PLANNING (PEP) TRANSPORTABILITY

  16. 13 CFR 124.503 - How does SBA accept a procurement for award through the 8(a) BD program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... market research, the contracting officer shall first consider a set-aside or sole source award (if the... market research conducted. In addition, the contracting officer must document the contract file showing... factors such as the results of market research, programmatic needs specific to the procuring agency...

  17. 13 CFR 124.502 - How does an agency offer a procurement to SBA for award through the 8(a) BD program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Assistance SMALL BUSINESS ADMINISTRATION 8(a) BUSINESS DEVELOPMENT/SMALL DISADVANTAGED BUSINESS STATUS DETERMINATIONS 8(a) Business Development Contractual Assistance § 124.502 How does an agency offer a procurement... competitive 8(a) requirements and those sole source requirements for which no specific Participant is...

  18. Pricing structures in US coal supply contracts

    NASA Astrophysics Data System (ADS)

    Kacker, Kanishka

    The subject of my dissertation is the study of coal procurement by electric utilities in the US over 2 decades, from 1979 to 2000. Energy markets are typically characterized by severe contracting problems. Buyers and sellers therefore employ various instruments, such as contract length or complex pricing arrangements, to restrict these problems. Relationship specific investment, wherein buyers make investments specific to their suppliers, has been advanced as a prominent explanation for contractual length. Investment decisions are however endogenous in length or pricing, making causal identification of the role of investment specificity difficult. In my first chapter, I attempt a resolution. I use the 1990 Clean Air Act Amendment as an exogenous shifter of the extent of relationship specific investment. A key feature of the Amendment's design helps me define a difference-in-difference model arguably free of the endogeneity issues discussed above. I find that the plants forced into switching - Phase I plants located in the US Midwest - are more likely to choose fixed price contracts than those that were not. Further they also write contracts of shorter terms, with the reduction being approximately 30%. Considerably little is known about the performance implications of contractual choices. These form the basis for Chapter 2. Here I find prices to be lower, by between 5% to 20% of the total transaction price, but the probability of renegotiation higher, under fixed price contracts than under escalator or cost-plus contracts. Contract choices appear consistent with a trade-off between establishing incentives ex-ante and lowering negotiation costs ex-post, with relationship specific investments in particular making such a trade-off compelling. Chapter 3 considers the regulatory environment these utilities were subject to. Both incentive based regulation as well as the restructuring of electricity generation are smaller in comparison to relationship specific investment in terms of their effects on contractual decisions. Consequently, when evaluating the effect of these reforms, ignoring the contractual structure of fuel procurement - and therefore investment specificity - leads to large and significant biases in their impacts.

  19. Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction

    NASA Astrophysics Data System (ADS)

    Trusaji, Wildan; Akbar, Muhammad; Sukoyo; Irianto, Dradjad

    2018-03-01

    In making bearing procurement analysis, price and its reliability must be considered as decision criteria, since price determines the direct cost as acquisition cost and reliability of bearing determine the indirect cost such as maintenance cost. Despite the indirect cost is hard to identify and measured, it has high contribution to overall cost that will be incurred. So, the indirect cost of reliability must be considered when making bearing procurement analysis. This paper tries to explain bearing evaluation method with the total cost of ownership analysis to consider price and maintenance cost as decision criteria. Furthermore, since there is a lack of failure data when bearing evaluation phase is conducted, reliability prediction method is used to predict bearing reliability from its dynamic load rating parameter. With this method, bearing with a higher price but has higher reliability is preferable for long-term planning. But for short-term planning the cheaper one but has lower reliability is preferable. This contextuality can give rise to conflict between stakeholders. Thus, the planning horizon needs to be agreed by all stakeholder before making a procurement decision.

  20. Healthy food procurement and nutrition standards in public facilities: evidence synthesis and consensus policy recommendations

    PubMed Central

    Kim D., Raine; Kayla, Atkey; Dana Lee, Dana Lee; Alexa R., Ferdinands; Dominique, Beaulieu; Susan, Buhler; Norm, Campbell; Brian, Cook; Mary, L’Abbé; Ashley, Lederer; David, Mowat; Joshna, Maharaj; Candace, Nykiforuk; Jacob, Shelley; Jacqueline, Street

    2018-01-01

    Abstract Introduction: Unhealthy foods are widely available in public settings across Canada, contributing to diet-related chronic diseases, such as obesity. This is a concern given that public facilities often provide a significant amount of food for consumption by vulnerable groups, including children and seniors. Healthy food procurement policies, which support procuring, distributing, selling, and/or serving healthier foods, have recently emerged as a promising strategy to counter this public health issue by increasing access to healthier foods. Although numerous Canadian health and scientific organizations have recommended such policies, they have not yet been broadly implemented in Canada. Methods: To inform further policy action on healthy food procurement in a Canadian context, we: (1) conducted an evidence synthesis to assess the impact of healthy food procurement policies on health outcomes and sales, intake, and availability of healthier food, and (2) hosted a consensus conference in September 2014. The consensus conference invited experts with public health/nutrition policy research expertise, as well as health services and food services practitioner experience, to review evidence, share experiences, and develop a consensus statement/recommendations on healthy food procurement in Canada. Results: Findings from the evidence synthesis and consensus recommendations for healthy food procurement in Canada are described. Specifically, we outline recommendations for governments, publicly funded institutions, decision-makers and professionals, citizens, and researchers. Conclusion: Implementation of healthy food procurement policies can increase Canadians’ access to healthier foods as part of a broader vision for food policy in Canada. PMID:29323862

  1. An analysis of disruptions in aerospace/defense organizations that affect the supply chain

    NASA Astrophysics Data System (ADS)

    Dickerson, Toscha L.

    The purpose of this quantitative study was to determine whether or not functions of procurement organizations structures' and aerospace suppliers were perceived as disruptions and to identify their effects on lead time and costs within a supply chain. An analysis of employees' perception of centralized and decentralized procurement functions, aerospace and defense suppliers, lead times of goods and services, price increases, and schedule delays was conducted. Prior studies are limited in regards to understanding how specific procurement functions affects an organization procurement structure. This non-experimental quantitative study allowed for a survey to be administered to aerospace and defense companies throughout the United States to obtain information from sourcing and procurement professionals with 5 or more years of experience. The current study utilized a 10 question survey based on the 5- point Likert -type scale to determine the findings. Through descriptive and inferential statistics, using regression analysis, standard deviation, and P-value; findings indicated that the majority of the participants surveyed perceived both centralized and decentralized procurement functions affected lead time and cost of goods and services resulted in a positive effect and were considered as supply chain disruptions.

  2. Ethical and practical considerations concerning perimortem sperm procurement in a severe neurologically damaged patient and the apparent discrepancy in validation of proxy consent in various postmortem procedures.

    PubMed

    Epker, J L; de Groot, Y J; Kompanje, E J O

    2012-06-01

    Although sperm procurement and preservation has been become commonplace in situations in which infertility can be easily foreseen, peri- or postmortem sperm procurement for reproductive use in unexpected coma or death is not generally accepted. There are no laws and regulations for this kind of intervention in all countries and they may also differ from country to country. Intensive care specialists can be confronted with a request for peri- or postmortem sperm procurement, while not being aware of the country-specific provisions. A young male patient who suffered 17 L blood loss and half an hour of cardiopulmonary resuscitation was admitted to a university hospital for an ill-understood unstoppable abdominal bleed. After rapid deterioration of the neurological situation, due to severe post-anoxic damage, the decision was made to withdraw life-sustaining treatment. At that moment the partner of the patient asked for perimortem sperm procurement, which was denied, on the basis of the ethical reasoning that consent of the man involved was lacking. Retrospectively the decision was right according to Dutch regulations; however, with more time for elaborate ethical reasoning, the decision outcome, without the awareness of an existing prohibition, also could have been different. Guidelines and laws for peri- or postmortem sperm procurement differ from country to country, so any intensive care specialist should have knowledge from the latest legislation for this specific subject in his/her country. An overview is provided. A decision based on ethical reasoning may appear satisfying, but can unfortunately be in full contrast with the existing laws.

  3. Translations on USSR Military Affairs, Number 1261

    DTIC Science & Technology

    1977-02-16

    committee directors down to the sports shooters themselves in the process of the business like discussion worked out specific solutions aimed at...poli- cies, views or attitudes of the U.S. Government. PROCUREMENT OF PUBLICATIONS JPRS publications may be ordered from the National Technical...Old Mansfield Road, Wooster, Ohio, 44691. Correspondence pertaining to matters other than procurement may be addressed to Joint Publications

  4. Medical device procurement in low- and middle-income settings: protocol for a systematic review.

    PubMed

    Diaconu, Karin; Chen, Yen-Fu; Manaseki-Holland, Semira; Cummins, Carole; Lilford, Richard

    2014-10-21

    Medical device procurement processes for low- and middle-income countries (LMICs) are a poorly understood and researched topic. To support LMIC policy formulation in this area, international public health organizations and research institutions issue a large body of predominantly grey literature including guidelines, manuals and recommendations. We propose to undertake a systematic review to identify and explore the medical device procurement methodologies suggested within this and further literature. Procurement facilitators and barriers will be identified, and methodologies for medical device prioritization under resource constraints will be discussed. Searches of both bibliographic and grey literature will be conducted to identify documents relating to the procurement of medical devices in LMICs. Data will be extracted according to protocol on a number of pre-specified issues and variables. First, data relating to the specific settings described within the literature will be noted. Second, information relating to medical device procurement methodologies will be extracted, including prioritization of procurement under resource constraints, the use of evidence (e.g. cost-effectiveness evaluations, burden of disease data) as well as stakeholders participating in procurement processes. Information relating to prioritization methodologies will be extracted in the form of quotes or keywords, and analysis will include qualitative meta-summary. Narrative synthesis will be employed to analyse data otherwise extracted. The PRISMA guidelines for reporting will be followed. The current review will identify recommended medical device procurement methodologies for LMICs. Prioritization methods for medical device acquisition will be explored. Relevant stakeholders, facilitators and barriers will be discussed. The review is aimed at both LMIC decision makers and the international research community and hopes to offer a first holistic conceptualization of this topic.

  5. Medical device procurement in low- and middle-income settings: protocol for a systematic review

    PubMed Central

    2014-01-01

    Background Medical device procurement processes for low- and middle-income countries (LMICs) are a poorly understood and researched topic. To support LMIC policy formulation in this area, international public health organizations and research institutions issue a large body of predominantly grey literature including guidelines, manuals and recommendations. We propose to undertake a systematic review to identify and explore the medical device procurement methodologies suggested within this and further literature. Procurement facilitators and barriers will be identified, and methodologies for medical device prioritization under resource constraints will be discussed. Methods/design Searches of both bibliographic and grey literature will be conducted to identify documents relating to the procurement of medical devices in LMICs. Data will be extracted according to protocol on a number of pre-specified issues and variables. First, data relating to the specific settings described within the literature will be noted. Second, information relating to medical device procurement methodologies will be extracted, including prioritization of procurement under resource constraints, the use of evidence (e.g. cost-effectiveness evaluations, burden of disease data) as well as stakeholders participating in procurement processes. Information relating to prioritization methodologies will be extracted in the form of quotes or keywords, and analysis will include qualitative meta-summary. Narrative synthesis will be employed to analyse data otherwise extracted. The PRISMA guidelines for reporting will be followed. Discussion The current review will identify recommended medical device procurement methodologies for LMICs. Prioritization methods for medical device acquisition will be explored. Relevant stakeholders, facilitators and barriers will be discussed. The review is aimed at both LMIC decision makers and the international research community and hopes to offer a first holistic conceptualization of this topic. PMID:25336161

  6. Procurement engineering - the productivity factor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bargerstock, S.B.

    1993-01-01

    The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment.more » Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station.« less

  7. Experiential learning not enough for organ procurement surgery: implications for perioperative nursing education.

    PubMed

    Smith, Zaneta; Leslie, Gavin; Wynaden, Dianne

    2015-12-01

    Perioperative nurses play a vital role in assisting in surgical procedures for multiorgan procurement, receiving little education apart from on-the-job experiential learning when they are asked to participate in these procedures. Within an Australian context and as part of a larger study, this article describes issues that hindered perioperative nurses' participatory experiences as a result of lacking education, previous exposure, and preparation for assisting in surgical procedures for organ procurement. The grounded theory method was used to develop a substantive theory of perioperative nurses' experiences of participating in surgical procedures for multiorgan procurement. Thirty-five perioperative nurses who had experience in surgical procedures for organ procurement from regional, rural, and metropolitan hospitals of 2 Australian states, New South Wales and Western Australia, participated in the research. Levels of knowledge and experience emerged from the data as an influencing condition and was reported to affect the perioperative nurses' participatory experiences when assisting in procurement surgical procedures. Six components of levels of knowledge and experience were identified and are described. The findings from this study provide a unique contribution to the existing literature by providing an in-depth understanding of the educational needs of perioperative nurses in order to assist successfully in multiorgan procurement procedures. These findings could guide further research with implications for clinical initiatives or education programs specifically targeting the perioperative nursing profession both locally and internationally.

  8. 40 CFR 35.6570 - Use of the same engineer during subsequent phases of response.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Use of the same engineer during... Agreement § 35.6570 Use of the same engineer during subsequent phases of response. (a) If the public notice... CERCLA remedial response Cooperative Agreement may use the engineer procured to conduct any or all of the...

  9. 40 CFR 35.6570 - Use of the same engineer during subsequent phases of response.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Use of the same engineer during... Agreement § 35.6570 Use of the same engineer during subsequent phases of response. (a) If the public notice... CERCLA remedial response Cooperative Agreement may use the engineer procured to conduct any or all of the...

  10. 40 CFR 35.6570 - Use of the same engineer during subsequent phases of response.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Use of the same engineer during... Agreement § 35.6570 Use of the same engineer during subsequent phases of response. (a) If the public notice... CERCLA remedial response Cooperative Agreement may use the engineer procured to conduct any or all of the...

  11. Data Specifications for the Landsat Data Continuity Mission

    USGS Publications Warehouse

    Irons, J.R.; Speciale, N.J.; Douglas, McCuistion J.; Masek, J.G.; Markham, B.L.; Storey, James C.; Lencioni, D.E.; Ryan, R.E.

    2003-01-01

    The National Aeronautics and Space Administration (NASA) plans to procure data from a privately-owned and commercially-operated remote sensing system for the next Landsat mission, the Landsat Data Continuity Mission (LDCM). Data requirements are documented in an LDCM Data Specification. The specifications require delivery of data covering 250 Landsat scenes on a daily basis. The data are to be acquired in a manner that affords seasonal coverage of the global land mass. Data are required for the heritage reflective Thematic Mapper (TM) spectral bands plus two new bands, a blue band for coastal zone observations and a short wave infrared band for cirrus cloud detection. The specifications do not require thermal data, representing a departure from the TM heritage. The specification also requires data providing a 30 m ground sample distance for each of the spectral bands with the exception of the new cirrus cloud band at 120 m. An absolute uncertainty of 5 percent or less is required for radiometrically corrected LDCM data and the commercial operator is required to deliver data that can be registered to a cartographic projection with an uncertainty of 65 m or less. Procuring data from a commercial operator represents a new approach for the 30-year-old Landsat Program. The LDCM Data Specification will ensure that the procured data provides continuity of the Landsat data stream and advances the mission.

  12. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  13. RASSP final technical report

    NASA Astrophysics Data System (ADS)

    1992-10-01

    The overall objective of the DARPA/Tri-Service RASSP program is to demonstrate a capability to rapidly specify, produce, and yield domain-specific, affordable signal processors for use in Department of Defense systems such as automatic target acquisition, tracking, and recognition, electronic countermeasures, communications, and SIGINT. The objective of the study phase is to specify a recommended program plan for the government to use as a template for procurement of the RASSP design system and demonstration program. To accomplish that objective, the study phase program tasks are to specify a development methodology for signal processors (adaptable to various organizational design styles, and application areas), analyze the requirements in CAD/CAE tools to support the development methodology, identify the state and development plans of the industry relative to this area, and to recommend the additional developments not currently being addressed by the industry, which are recommended as RASSP developments. In addition, the RASSP study phase will define a linking approach for electronically linking design centers to manufacturing centers so a complete cycle for prototyping can be accomplished with significantly reduced cycle time.

  14. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  15. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  16. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  17. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  18. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  19. Two-Step Formal Advertisement: An Examination.

    DTIC Science & Technology

    1976-10-01

    The purpose of this report is to examine the potential application of the Two-Step Formal Advertisement method of procurement. Emphasis is placed on...Step formal advertising is a method of procurement designed to take advantage of negotiation flexibility and at the same time obtain the benefits of...formal advertising . It is used where the specifications are not sufficiently definite or may be too restrictive to permit full and free competition

  20. Introduction to Acquisition Management.

    DTIC Science & Technology

    1987-12-01

    reported to the SECDEF and the Defense Acquisition Executive. During this phase (the third of the life cycle), the systera, including all essential...will not be enough. R&M 2000 is a those military and civilian maintenance people cultural change within the Air Force and what they find frustrating or...Contracting Officer position. Respon- sibilities of contracting officers are divided : kud thne-phased; the contract is awarded by the Procuring Contracting

  1. Management approach recommendations. Earth Observatory Satellite system definition study (EOS)

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Management analyses and tradeoffs were performed to determine the most cost effective management approach for the Earth Observatory Satellite (EOS) Phase C/D. The basic objectives of the management approach are identified. Some of the subjects considered are as follows: (1) contract startup phase, (2) project management control system, (3) configuration management, (4) quality control and reliability engineering requirements, and (5) the parts procurement program.

  2. Demand-pull and environmental innovations: Estimating the effects of innovative public procurement.

    PubMed

    Ghisetti, Claudia

    2017-12-01

    This paper contributes to the emerging literature on the adoption of environmental innovation, by investigating the so far unexplored role of governmental demand in stimulating 'greener' production choices. Specifically, the role of innovative public procurement in driving the adoption and diffusion of sustainable manufacturing technologies is analysed. Results, based on firm-level data in the 28 Member States of the European Union, Switzerland and the USA, are obtained through non-parametric matching techniques. Those outline the crucial role of innovative public procurement in the uptake of environmental innovations. This confirms the relevance of such policy instrument in allowing countries to achieve a decarbonised and sustainable growth path which is compatible with competitiveness goals.

  3. Global survey of malaria rapid diagnostic test (RDT) sales, procurement and lot verification practices: assessing the use of the WHO-FIND Malaria RDT Evaluation Programme (2011-2014).

    PubMed

    Incardona, Sandra; Serra-Casas, Elisa; Champouillon, Nora; Nsanzabana, Christian; Cunningham, Jane; González, Iveth J

    2017-05-15

    Malaria rapid diagnostic tests (RDTs) play a critical role in malaria case management, and assurance of quality is a key factor to promote good adherence to test results. Since 2007, the World Health Organization (WHO) and the Foundation for Innovative New Diagnostics (FIND) have coordinated a Malaria RDT Evaluation Programme, comprising a pre-purchase performance evaluation (product testing, PT) and a pre-distribution quality control of lots (lot testing, LT), the former being the basis of WHO recommendations for RDT procurement. Comprehensive information on malaria RDTs sold worldwide based on manufacturers' data and linked to independent performance data is currently not available, and detailed knowledge of procurement practices remains limited. The use of the PT/LT Programme results as well as procurement and lot verification practices were assessed through a large-scale survey, gathering product-specific RDT sales and procurement data (2011-14 period) from a total of 32 manufacturers, 12 procurers and 68 National Malaria Control Programmes (NMCPs). Manufacturers' reports showed that RDT sales had more than doubled over the four years, and confirmed a trend towards increased compliance with the WHO procurement criteria (from 83% in 2011 to 93% in 2014). Country-level reports indicated that 74% of NMCPs procured only 'WHO-compliant' RDT products, although procurers' transactions datasets revealed a surprisingly frequent overlap of different products and even product types (e.g., Plasmodium falciparum-only and Plasmodium-pan) in the same year and country (60 and 46% of countries, respectively). Importantly, the proportion of 'non-complying' (i.e., PT low scored or not evaluated) products was found to be higher in the private health care sector than in the public sector (32% vs 5%), and increasing over time (from 22% of private sector sales in 2011 to 39% in 2014). An estimated 70% of the RDT market was covered by the LT programme. The opinion about the PT/LT Programmes was positive overall, and quality of RDTs as per the PT Programme was rated as the number one procurement criteria. This survey provided in-depth information on RDT sales and procurement dynamics, including the largely unstudied private sector, and demonstrated how the WHO-FIND Programme has positively influenced procurement practices in the public sector.

  4. Light Rail Transit Car Specification Guide

    DOT National Transportation Integrated Search

    1981-12-01

    This Light Rail Transit Car Specification Guide is not a procurement document in itself. It is intended to be used as a guide by light rail transit operators and purchasers of such equipment in the preparation of technical specifications. Because of ...

  5. Asking the difficult questions: message strategies used by organ procurement coordinators in requesting familial consent to organ donation.

    PubMed

    Anker, Ashley E; Feeley, Thomas Hugh

    2011-07-01

    The present study provides an in-depth examination of the messages used by organ procurement coordinators (OPCs) in shaping familial requests for organ donation. OPCs (N = 102), recruited from a national sample of 16 organ procurement organizations, participated in a structured interview designed to uncover the communication strategies used in obtaining familial consent for donation. Analysis of interviews indicates OPCs' messages cover 4 domain areas. Specifically, OPCs report use of messages intended to (a) provide education, (b) discuss the benefits to donation, (c) learn about potential donor families, and (d) persuade families to engage in donation. Within the 4 domain areas, OPCs report use of 15 specific messages (e.g., "positively framing the donor," "social proof," "discuss the benefit of donation to grieving") in requesting consent. The present study provides a detailed examination of strategies and offers recommendations for using message strategies to explore the effectiveness of the consent process from the perspective of OPCs in approaching donor families.

  6. Evaluation of the Cape Cod Advanced Public Transit System : phase 1 and 2

    DOT National Transportation Integrated Search

    2000-03-01

    This case study is one of a series of case studies that examine procurement approaches used to deliver Intelligent Transportation System (ITS) projects. ITS projects are often complex and leverage the latest technology in telecommunications, computer...

  7. Monitoring What Governments “Give for” and “Spend on” Vaccine Procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline

    PubMed Central

    Nelson, E. A. S.; Bloom, David E.; Mahoney, Richard T.

    2014-01-01

    Background The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments – both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. Objective To determine realistic targets for VPA and VPB. Methods Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. Findings In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Conclusions Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs. PMID:24586899

  8. Monitoring what governments "give for" and "spend on" vaccine procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline.

    PubMed

    Nelson, E A S; Bloom, David E; Mahoney, Richard T

    2014-01-01

    The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. To determine realistic targets for VPA and VPB. Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs.

  9. 40 CFR 247.5 - Specifications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Specifications. 247.5 Section 247.5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS General § 247.5 Specifications. (a) RCRA section 6002...

  10. Factors to consider in developing individual pharmaceutical product quality risk profiles useful to government procurement agencies

    PubMed Central

    Xu, Wei; Boehm, Garth; Zheng, Qiang

    2015-01-01

    Governments that procure pharmaceutical products from an Essential Medicine List (EML) bear special responsibility for the quality of these products. In this article we examine the possibility of developing a pharmaceutical product quality risk assessment scheme for use by government procurement officials. We use the Chinese EML as a basis, and US recall data is examined as it is publically available.This is justified as the article is only concerned with inherent product quality risks. After establishing a link between Chinese essential medicines and those available in the US, we examine US recall data to separate product specific recalls. We conclude that, in addition to existing manufacturing based risks, there are two other product specific risks that stand out from all others, degradation and dissolution failure. Methodology for relative product risk for degradation is needed to be developed and further work is required to better understand dissolution failures which largely occur with modified-release solid oral products. We conclude that a product specific quality risk profile would be enhanced by including a risk assessment for degradation for all products, and in the case of solid oral products, dissolution. PMID:26904402

  11. Factors to consider in developing individual pharmaceutical product quality risk profiles useful to government procurement agencies.

    PubMed

    Xu, Wei; Boehm, Garth; Zheng, Qiang

    2016-01-01

    Governments that procure pharmaceutical products from an Essential Medicine List (EML) bear special responsibility for the quality of these products. In this article we examine the possibility of developing a pharmaceutical product quality risk assessment scheme for use by government procurement officials. We use the Chinese EML as a basis, and US recall data is examined as it is publically available.This is justified as the article is only concerned with inherent product quality risks. After establishing a link between Chinese essential medicines and those available in the US, we examine US recall data to separate product specific recalls. We conclude that, in addition to existing manufacturing based risks, there are two other product specific risks that stand out from all others, degradation and dissolution failure. Methodology for relative product risk for degradation is needed to be developed and further work is required to better understand dissolution failures which largely occur with modified-release solid oral products. We conclude that a product specific quality risk profile would be enhanced by including a risk assessment for degradation for all products, and in the case of solid oral products, dissolution.

  12. Perimeter intrusion detection and assessment system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eaton, M.J.; Jacobs, J.; McGovern, D.E.

    1977-11-01

    To obtain an effective perimeter intrusion detection system requires careful sensor selection, procurement, and installation. The selection process involves a thorough understanding of the unique site features and how these features affect the performance of each type of sensor. It is necessary to develop procurement specifications to establish acceptable sensor performance limits. Careful explanation and inspection of critical installation dimensions is required during on-site construction. The implementation of these activities at a particular site is discussed.

  13. The Photovolatic Manufacturing Technology project (PVMaT) after three years

    NASA Astrophysics Data System (ADS)

    Witt, C. Edwin; Mitchell, Richard L.; Thomas, Holly; Herwig, Lloyd O.

    1994-08-01

    The Photovoltaic Manufacturing Technology project (PVMaT) is a government/industry research and development (R&D) partnership involving joint efforts between the federal government (through the US Department of Energy (DOE)) and members of the US photovoltaic (PV) industry. The project's goal is to assist US industry in retaining and extending its world leadership role in the manufacture and commercial development of PV components and systems. PVMaT is being carried out in three separate phases, each designed to address separate R&D requirements for achieving PVMaT goals. Phase 1 was a problem identification phase of about 3 months duration. In Phase 1, the status and needs of the US PV manufacturing industry were identified, and the development of a Phase 2 procurement responsive to the industry's needs was begun. Phase 1 was completed in 1991. Problem solution began in 1992, under Phase 2A, when DOE awarded multiyear subcontracts. Technical accomplishments for PVMaT 2A are presented in this paper. Subcontracts were recently awarded for a second, overlapping, and similar process-specific solicitation (PVMaT 2B). The activities of these new subcontracts are also described. Two subcontracts presently comprise the Phase 3 effort. Phase 3 addresses R&D problems that are relatively common to a number of PV companies or the PV industry as a whole. A teamed research approach is being used to improve automated module manufacturing lines and encapsulation materials used in module manufacturing. The first year's work on these subcontracts is also described in this paper.

  14. Methods for medical device and equipment procurement and prioritization within low- and middle-income countries: findings of a systematic literature review.

    PubMed

    Diaconu, Karin; Chen, Yen-Fu; Cummins, Carole; Jimenez Moyao, Gabriela; Manaseki-Holland, Semira; Lilford, Richard

    2017-08-18

    Forty to 70 % of medical devices and equipment in low- and middle-income countries are broken, unused or unfit for purpose; this impairs service delivery to patients and results in lost resources. Undiscerning procurement processes are at the heart of this issue. We conducted a systematic review of the literature to August 2013 with no time or language restrictions to identify what product selection or prioritization methods are recommended or used for medical device and equipment procurement planning within low- and middle-income countries. We explore the factors/evidence-base proposed for consideration within such methods and identify prioritization criteria. We included 217 documents (corresponding to 250 texts) in the narrative synthesis. Of these 111 featured in the meta-summary. We identify experience and needs-based methods used to reach procurement decisions. Equipment costs (including maintenance) and health needs are the dominant issues considered. Extracted data suggest that procurement officials should prioritize devices with low- and middle-income country appropriate technical specifications - i.e. devices and equipment that can be used given available human resources, infrastructure and maintenance capacity. Suboptimal device use is directly linked to incomplete costing and inadequate consideration of maintenance services and user training during procurement planning. Accurate estimation of life-cycle costing and careful consideration of device servicing are of crucial importance.

  15. Human rights violations in organ procurement practice in China.

    PubMed

    Paul, Norbert W; Caplan, Arthur; Shapiro, Michael E; Els, Charl; Allison, Kirk C; Li, Huige

    2017-02-08

    Over 90% of the organs transplanted in China before 2010 were procured from prisoners. Although Chinese officials announced in December 2014 that the country would completely cease using organs harvested from prisoners, no regulatory adjustments or changes in China's organ donation laws followed. As a result, the use of prisoner organs remains legal in China if consent is obtained. We have collected and analysed available evidence on human rights violations in the organ procurement practice in China. We demonstrate that the practice not only violates international ethics standards, it is also associated with a large scale neglect of fundamental human rights. This includes organ procurement without consent from prisoners or their families as well as procurement of organs from incompletely executed, still-living prisoners. The human rights critique of these practices will also address the specific situatedness of prisoners, often conditioned and traumatized by a cascade of human rights abuses in judicial structures. To end the unethical practice and the abuse associated with it, we suggest to inextricably bind the use of human organs procured in the Chinese transplant system to enacting Chinese legislation prohibiting the use of organs from executed prisoners and making explicit rules for law enforcement. Other than that, the international community must cease to abet the continuation of the present system by demanding an authoritative ban on the use of organs from executed Chinese prisoners.

  16. Protecting the Environment Through Public Procurement Law - The Case of Poland

    NASA Astrophysics Data System (ADS)

    Kozik, Renata; Karasińska-Jaśkowiec, Izabela

    2016-10-01

    The article presents the results of studies whose aim was to analyse public procurement procedures in the context of environmental protection, especially wastewater infrastructure, performed in the selected Polish municipalities. The selection criterions were the time of public procurement procedure - from 2009 until 2015 and that the contract was cofinanced by the European Union funds. The contracting authorities responsible for awarding specific contracts, were asked series of detailed questions about the environmental criteria and requirements contained in the tender documents for the construction contracts related to the wastewater infrastructure. The aim of the detailed study was to determine whether the actions taken by the contracting authorities in a tender procedure for the construction or operation of wastewater infrastructure include environmental issues. Authors examine also the applicable public procurement law regulation in Poland and Europe in the context of sustainable development and environmental protection. The study of public procurement law was to check whether the law regulation fully takes into account the environmental aspects of the planned investments. On this basis, conclusions have been made that laws are consistent and do not constitute an obstacle to awarding a contract positively affecting the environment.

  17. Energy-efficient Public Procurement: Best Practice in Program Delivery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Payne, Christopher; Weber, Andrew; Semple, Abby

    2013-02-15

    This document illustrates the key issues and considerations involved in implementing energy-efficient public procurement. Our primary sources of information have been our partners in the Super Efficient Equipment and Appliance Deployment (SEAD) Initiative Procurement Working Group. Where applicable, we have highlighted specific ways in which working group participants have successfully overcome barriers to delivering effective programs. The following key points emerge from this analysis of programs for energy-efficient public procurement. Lessons for both developed and developing programs are highlighted throughout the guide. 1. Policy: Policy provides the initiative to begin a transition from first cost to life-cycle cost based purchasingmore » methods and culture. Effective policy is well-communicated, establishes accountability from top to bottom of organizations and simplifies the processes necessary to comply. Flexibility and responsiveness are essential in policy development and implementation. Mandatory and voluntary policies may complement one another. 2. Procurement Criteria: Procurement staff must be confident that energy-efficient procurement criteria offer the best long-term value for their organization’s money and represent real environmental gains. Involving multiple stakeholders at the early stages of the criteria creation process can result in greater levels of cooperation from private industry. Criteria should make comparison of products easy for purchasers and require minimal additional calculations. Criteria will need to be regularly updated to reflect market developments. 3. Training: Resources for the creation of training programs are usually very limited, but well-targeted training is necessary in order for a program to be effective. Training must emphasize a process that is efficient for purchasers and simplifies compliance. Purchaser resources and policy must be well designed for training to be effective. Training program development is an excellent opportunity for collaboration amongst public authorities. 4. Procurement Processes: Many tools and guides intended to help buyers comply with energy-efficient procurement policy are designed without detailed knowledge of the procurement process. A deeper understanding of purchasing pathways allows resources to be better directed. Current research by national and international bodies aims to analyze purchasing pathways and can assist in developing future resources.« less

  18. Small-Angle Neutron Scattering on Crosslink Distribution of Epoxy Networks.

    DTIC Science & Technology

    1985-10-01

    distinct second phase or heterogeneity has been detected. Small- angle X-ray scattering (SAXS), 1 nuclear magnetic resonance (NMR) ,2 electron ... paramagnetic resonance (EPR),3 and glass transition 4temperature (Tg) measurements reveal a second phase which is attri- . buted to a heterogeneous...FUNDING/SPONSORING lab. OFFICE SYMBOL 9. PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER * ORGANIZATION I (If applticable)j F3361 5-84-C-5020 * Bc ADDRESS

  19. [Organ procurement and transplantation from non-heart-beating donors].

    PubMed

    Antoine, Corinne; Brun, Frédéric; Tenaillon, Alain; Loty, Bernard

    2008-02-01

    Despite a significant increase in procurement and transplantation activities observed in France in the last eight years, the shortage in grafts is on the rise and demand keeps being much higher than supply. Since 1968 and until now, procurement was limited to heart beating brain donors. The results of kidneys transplanted from non-heart-beating donors have significantly improved and are nowadays comparable to those of kidney transplantations from brain death donors, thanks to a more accurate selection of donors and recipients, to better respect of preventing cold and warm ischemia times and to several major therapeutic innovations. Procurement on non-heart-beating donors are therefore being reconsidered under considerations of feasibility, results and ethical and legal consequences, under a specific medical protocol issued by the agency of biomedicine with the pilot hospital center agreement to comply with the protocol. Referring to foreign experiences, this program is likely to decrease the organ shortage, which is jeopardizing the treatment of a large number of patients awaiting transplantation.

  20. Synthesis of methods for developing transit vehicle specifications.

    DOT National Transportation Integrated Search

    2014-06-01

    The Michigan Department of Transportation (MDOT) has the objective to thoroughly assess its : transit vehicle specification and procurement program in order to compare best practices from : peer states and identify recommendations for improved effici...

  1. Do changes to supply chains and procurement processes yield cost savings and improve availability of pharmaceuticals, vaccines or health products? A systematic review of evidence from low-income and middle-income countries

    PubMed Central

    Atun, Rifat

    2017-01-01

    Introduction Improving health systems performance, especially in low-resource settings facing complex disease burdens, can improve population health. Specifically, the efficiency and effectiveness of supply chains and procurement processes for pharmaceuticals, vaccines and other health products has important implications for health system performance. Pharmaceuticals, vaccines and other health products make up a large share of total health expenditure in low-income and middle-income countries (LMICs), and they are critical for delivering health services. Therefore, programmes which achieve cost savings on these expenditures may help improve a health system's efficiency, whereas programmes that increase availability of health products may improve a health system's effectiveness. This systematic review investigates whether changes to supply chains and procurement processes can achieve cost savings and/or improve the availability of drugs in LMICs. Methods Using the PRISMA guidelines for systematic reviews, we searched PubMed, Embase, CINAHL and the Health Economic Evaluation Database to identify. Results We identified 1264 articles, of which 38 were included in our study. We found evidence that centralised procurement and tendering can achieve direct cost savings, while supply chain management programmes can reduce drug stock outs and increase drug availability for populations. Conclusions This research identifies a broad set of programmes which can improve the ways that health systems purchase and delivery health products. On the basis of this evidence, policymakers and programme managers should examine the root causes of inefficiencies in pharmaceutical supply chain and procurement processes in order to determine how best to improve health systems performance in their specific contexts. PMID:28589028

  2. Do changes to supply chains and procurement processes yield cost savings and improve availability of pharmaceuticals, vaccines or health products? A systematic review of evidence from low-income and middle-income countries.

    PubMed

    Seidman, Gabriel; Atun, Rifat

    2017-01-01

    Improving health systems performance, especially in low-resource settings facing complex disease burdens, can improve population health. Specifically, the efficiency and effectiveness of supply chains and procurement processes for pharmaceuticals, vaccines and other health products has important implications for health system performance. Pharmaceuticals, vaccines and other health products make up a large share of total health expenditure in low-income and middle-income countries (LMICs), and they are critical for delivering health services. Therefore, programmes which achieve cost savings on these expenditures may help improve a health system's efficiency, whereas programmes that increase availability of health products may improve a health system's effectiveness. This systematic review investigates whether changes to supply chains and procurement processes can achieve cost savings and/or improve the availability of drugs in LMICs. Using the PRISMA guidelines for systematic reviews, we searched PubMed, Embase, CINAHL and the Health Economic Evaluation Database to identify. We identified 1264 articles, of which 38 were included in our study. We found evidence that centralised procurement and tendering can achieve direct cost savings, while supply chain management programmes can reduce drug stock outs and increase drug availability for populations. This research identifies a broad set of programmes which can improve the ways that health systems purchase and delivery health products. On the basis of this evidence, policymakers and programme managers should examine the root causes of inefficiencies in pharmaceutical supply chain and procurement processes in order to determine how best to improve health systems performance in their specific contexts.

  3. 41 CFR 101-30.703 - Program objectives.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... the Federal catalog system data base; and (e) Phasing out of the Government supply system those items... management, and warehousing costs; then following through to eliminate the items from agency catalog systems...

  4. 41 CFR 101-30.703 - Program objectives.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... the Federal catalog system data base; and (e) Phasing out of the Government supply system those items... management, and warehousing costs; then following through to eliminate the items from agency catalog systems...

  5. 41 CFR 101-30.703 - Program objectives.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... the Federal catalog system data base; and (e) Phasing out of the Government supply system those items... management, and warehousing costs; then following through to eliminate the items from agency catalog systems...

  6. 41 CFR 101-30.703 - Program objectives.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... the Federal catalog system data base; and (e) Phasing out of the Government supply system those items... management, and warehousing costs; then following through to eliminate the items from agency catalog systems...

  7. 41 CFR 101-30.703 - Program objectives.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... the Federal catalog system data base; and (e) Phasing out of the Government supply system those items... management, and warehousing costs; then following through to eliminate the items from agency catalog systems...

  8. Evaluation of advanced microelectronics for inclusion in MIL-STD-975

    NASA Technical Reports Server (NTRS)

    Scott, W. Richard

    1991-01-01

    The approach taken by NASA and JPL (Jet Propulsion Laboratory) in the development of a MIL-STD-975 section which contains advanced technology such as Large Scale Integration and Very Large Scale Integration (LSI/VLSI) microelectronic devices is described. The parts listed in this section are recommended as satisfactory for NASA flight applications, in the absence of alternate qualified devices, based on satisfactory results of a vendor capability audit, the availability of sufficient characterization and reliability data from the manufacturers and users and negotiated detail procurement specifications. The criteria used in the selection and evaluation of the vendors and candidate parts, the preparation of procurement specifications, and the status of this activity are discussed.

  9. Waste-efficient materials procurement for construction projects: A structural equation modelling of critical success factors.

    PubMed

    Ajayi, Saheed O; Oyedele, Lukumon O

    2018-05-01

    Albeit the understanding that construction waste is caused by activities ranging from all stages of project delivery process, research efforts have been concentrated on design and construction stages, while the possibility of reducing waste through materials procurement process is widely neglected. This study aims at exploring and confirming strategies for achieving waste-efficient materials procurement in construction activities. The study employs sequential exploratory mixed method approach as its methodological framework, using focus group discussion, statistical analysis and structural equation modelling. The study suggests that for materials procurement to enhance waste minimisation in construction projects, the procurement process would be characterised by four features. These include suppliers' commitment to low waste measures, low waste purchase management, effective materials delivery management and waste-efficient Bill of Quantity, all of which have significant impacts on waste minimisation. This implies that commitment of materials suppliers to such measures as take back scheme and flexibility in supplying small materials quantity, among others, are expected of materials procurement. While low waste purchase management stipulates the need for such measures as reduced packaging and consideration of pre-assembled/pre-cut materials, efficient delivery management entails effective delivery and storage system as well as adequate protection of materials during the delivery process, among others. Waste-efficient specification and bill of quantity, on the other hand, requires accurate materials take-off and ordering of materials based on accurately prepared design documents and bill of quantity. Findings of this study could assist in understanding a set of measures that should be taken during materials procurement process, thereby corroborating waste management practices at other stages of project delivery process. Copyright © 2018. Published by Elsevier Ltd.

  10. Total Face, Eyelids, Ears, Scalp, and Skeletal Subunit Transplant Research Procurement: A Translational Simulation Model.

    PubMed

    Sosin, Michael; Ceradini, Daniel J; Hazen, Alexes; Sweeney, Nicole G; Brecht, Lawrence E; Levine, Jamie P; Staffenberg, David A; Saadeh, Pierre B; Bernstein, G Leslie; Rodriguez, Eduardo D

    2016-05-01

    Cadaveric face transplant models are routinely used for technical allograft design, perfusion assessment, and transplant simulation but are associated with substantial limitations. The purpose of this study was to describe the experience of implementing a translational donor research facial procurement and solid organ allograft recovery model. Institutional review board approval was obtained, and a 49-year-old, brain-dead donor was identified for facial vascularized composite allograft research procurement. The family generously consented to donation of solid organs and the total face, eyelids, ears, scalp, and skeletal subunit allograft. The successful sequence of computed tomographic scanning, fabrication and postprocessing of patient-specific cutting guides, tracheostomy placement, preoperative fluorescent angiography, silicone mask facial impression, donor facial allograft recovery, postprocurement fluorescent angiography, and successful recovery of kidneys and liver occurred without any donor instability. Preservation of the bilateral external carotid arteries, facial arteries, occipital arteries, and bilateral thyrolinguofacial and internal jugular veins provided reliable and robust perfusion to the entirety of the allograft. Total time of facial procurement was 10 hours 57 minutes. Essential to clinical face transplant outcomes is the preparedness of the institution, multidisciplinary face transplant team, organ procurement organization, and solid organ transplant colleagues. A translational facial research procurement and solid organ recovery model serves as an educational experience to modify processes and address procedural, anatomical, and logistical concerns for institutions developing a clinical face transplantation program. This methodical approach best simulates the stressors and challenges that can be expected during clinical face transplantation. Therapeutic, V.

  11. Qualification test results for DOE solar photovoltaic flat panel procurement - PRDA 38

    NASA Technical Reports Server (NTRS)

    Griffith, J. S.

    1980-01-01

    Twelve types of prototypes modules for the DOE Photovoltaic Flat Panel Procurement (PRDA 38) were subjected to qualification tests at the Jet Propulsion Laboratory according to a new specification. Environmental exposures were carried out separately and included temperature cycling, humidity, wind simulation, and hail. The most serious problems discovered were reduced insulation resistance to ground and ground continuity of the metal frames, electrical degradation, erratic power readings, and delamination. The electrical and physical characteristics of the newly received modules are also given.

  12. Guidebook for preparation of aircraft-system survivability requirements for procurement documents. Final report, October 1975-October 1976

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morrow, J.J.; Burris, R.A.; Watson, D.J.

    1977-05-01

    This report is intended to provide guidelines for the preparation of procurements specifications for aircraft survivability enhancement equipment, for the survivability/vulnerability (S/V) tasks associated with the procurement of a total aircraft system or its relate subsystems, and also for the modification of current fleet aircraft to their related subsystems. It is intended that these S/V procurement guidelines be applied to the procurement of all military aircraft, aircraft subsystems, and aircraft componenets which can either lose their functional capability of have their performance degraded as a result of interactions with the damage mechanisms of threat weapons. The guidelines should be appliedmore » to preliminary design programs, to production programs, and to programs that will retrofit or modify existing systems. These guidelines include general requirements statements for the establishment of an S/V program, requirements statements for reducing the susceptibility of the system to the threat weapons, and requirements for the reduction of vulnerability to nonnuclear, nuclear, and laser weapon effects. Requirements for S/V assessments and the verification of vulnerability levels and survival enhancement features are also included. Although nuclear and laser weapon effects are included, the major emphasis is on the reduction of susceptibility and vulnerability to conventional weapons and the establishment of the S/V program.« less

  13. [Critical appraisal of organ procurement under Maastricht 3 condition].

    PubMed

    Puybasset, L; Bazin, J-E; Beloucif, S; Bizouarn, P; Crozier, S; Devalois, B; Eon, B; Fieux, F; Gisquet, E; Guibet-Lafaye, C; Kentish, N; Lienhart, A; Nicolas-Robin, A; Otero Lopez, M; Pelluchon, C; Roussin, F; Beydon, L

    2012-05-01

    The ethics committee of the French Society of Anesthesia and Intensive Care (Sfar) has been requested by the French Biomedical Agency to consider the issue of organ donation in patients after a decision of withdrawing life supporting therapies has been taken. This category of organ donation is performed in the USA, Canada, United Kingdom, the Netherlands and Belgium. The three former countries have published recommendations, which formalize procedures and operations. The Sfar ethics committee has considered this issue and envisioned the different aspects of the whole process. Consequently, it sounds a note of caution regarding the applicability of this type of organ procurement in unselected patient following a decision to withdraw life supporting therapies. According to the French regulation concerning organ procurement in brain dead patients, the committee stresses the need to restrict this specific way of procurement to severely brain injured patients, once confirmatory investigations predicting a catastrophic prognosis have been performed. It suggests that the nature of the confirmatory investigation required should be formalized by the French Biomedical Agency on behalf of the French parliamentarians. This should help preserving population trust regarding organ procurement and provide a framework to medical decision. This text has been endorsed by the Sfar. Copyright © 2012. Published by Elsevier SAS.

  14. Cost containment through pharmaceutical procurement: a Caribbean case study.

    PubMed

    Huff-Rousselle, M; Burnett, F

    1996-01-01

    This article discusses the potential for health sector cost containment in developing countries through improved pharmaceutical procurement. By describing the specific example of the Eastern Caribbean Drug Service (ECDS), which provides a pooled procurement service to nine ministries of health in the small island nations of the Caribbean, it examines the elements of the procurement operation that allowed ECDS to reduce unit costs for pharmaceuticals by over 50 per cent during its first procurement cycle. The analysis of ECDS considers: (1) political will, institutional alliances, and the creation of a public sector monopsony; (2) pooling demand; (3) restricted international tendering and the pharmaceutical industry; (4) estimating demand and supplier guarantees; (5) reducing variety and increasing volume through standardizing pack sizes, dosage forms and strengths; (6) generic bidding and therapeutic alternative bidding; (7) mode of transport from foreign suppliers; (8) financing mechanisms, including choice of currency, foreign exchange, and terms of payment; (9) market conditions and crafting and enforcing supplier contracts; and, (10) the adjudication process, including consideration of suppliers' past performance, precision requirements in the manufacturing process, number of products awarded to suppliers, and issues of judgment. The authors consider the relevance of this agency's experience to other developing countries by providing a blueprint that can be adopted or modified to suit other situations.

  15. Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to managemore » and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.« less

  16. The 30/20 GHz flight experiment system, phase 2. Volume 3: Experiment system requirement document

    NASA Technical Reports Server (NTRS)

    Bronstein, L.; Kawamoto, Y.; Ribarich, J. J.; Scope, J. R.; Forman, B. J.; Berman, S. G.; Reisenfeld, S.

    1981-01-01

    An approach to the requirements document to be used to procure the system by NASA is presented. The basic approach is similar to the requirements document used in the commercial communication satellite. Enough detail requirements are given to define the system without tight constraints.

  17. A Proposed Framework of Institutional Research Development Phases

    ERIC Educational Resources Information Center

    Bosch, Anita; Taylor, John

    2011-01-01

    Globally, research has become a key driver for the achievement of status and the procurement of funding for higher education institutions. Although there is mounting pressure on institutions to become research active, many institutions are rooted in a strong tradition of teaching. These institutions find it challenging to develop research capacity…

  18. Low-cost Engineering of Laser Rods and Slabs with Liquid Phase Epitaxy

    DTIC Science & Technology

    2011-09-01

    SUPPLEMENTARY NOTES 14. ABSTRACT We investigated the use of a liquid phase epitaxial ( LPE ) coating to improve the performance of a rod or slab laser. A...single crystal erbium-doped yttrium aluminum garnet (Er:YAG) rod coated with undoped YAG, and an uncoated sample were procured, then compared on the...the whispering gallery modes, which otherwise would deplete the gain in ~50% of the rod volume. We also investigated LPE growth on a ceramic sample

  19. Significance of ITER IWS Material Selection and Qualification

    NASA Astrophysics Data System (ADS)

    Mehta, Bhoomi K.; Raval, Jigar; Maheshwari, Abha; Laad, Rahul; Singh, Gurlovleen; Pathak, Haresh

    2017-04-01

    In-Wall Shielding (IWS) is one of the important components of ITER Vacuum Vessel (VV) which fills the space between double walls of VV with cooling water. Procurement Arrangement (PA) for IWS has been signed with Indian Domestic Agency (INDA). Procurement of IWS materials, fabrication of IWS blocks and its delivery to respective Domestic Agency (DA) and ITER Organization (IO) are the main scope of this PA. Hence, INDIA is the only country which is contributing to VV IWS among all seven ITER partners. The main functions of the IWS are to provide Neutron Shielding with blanket, VV shells and water during plasma operations and to reduce ripple of the Toroidal Magnetic Field. To meet these functional requirements IWS blocks are made up of special materials (Borated Steels SS304 B4 & SS304 B7, Ferritic Steels SS 430, Austenitic Steel SS 316 L (N)-IG, XM-19 and Inconel-625) which are qualified, reliable and traceable for the design assessment. The choice of these materials has a significant influence on performance, maintainability, licensing, detailed design parameters and waste disposal. The main reasons for the materials selected for IWS are its high mechanical strength at operating temperatures, water chemistry properties, excellent fabrication characteristics and low cost relative to other similar materials. All the materials are qualified with respect to their respective codes (ASTM/EN standards with additional requirements as described in RCC-MR code 2007) and ITER requirements. Agreed Notified Body (ANB) has control conformity of materials certificates with approved material specification and traceability procedure for Safety Important Component (SIC). The procurement strategy for all the IWS materials has been developed in close collaboration with IO, ANB and Industries as per Product Procurement Specification (PPS). The R&D for sample, bulk material production, testing, inspection and handling as required are carried out by IN DA and IO. At present almost all IWS materials (∼2500 Tons) has been procured by IN DA with spares to manufacture ∼9000 IWS blocks. This paper summarizes IWS material selection, qualification and procurement processes in detail.

  20. A Conceptual Framework for Procurement Decision Making Model to Optimize Supplier Selection: The Case of Malaysian Construction Industry

    NASA Astrophysics Data System (ADS)

    Chuan, Ngam Min; Thiruchelvam, Sivadass; Nasharuddin Mustapha, Kamal; Che Muda, Zakaria; Mat Husin, Norhayati; Yong, Lee Choon; Ghazali, Azrul; Ezanee Rusli, Mohd; Itam, Zarina Binti; Beddu, Salmia; Liyana Mohd Kamal, Nur

    2016-03-01

    This paper intends to fathom the current state of procurement system in Malaysia specifically in the construction industry in the aspect of supplier selection. This paper propose a comprehensive study on the supplier selection metrics for infrastructure building, weight the importance of each metrics assigned and to find the relationship between the metrics among initiators, decision makers, buyers and users. With the metrics hierarchy of criteria importance, a supplier selection process can be defined, repeated and audited with lesser complications or difficulties. This will help the field of procurement to improve as this research is able to develop and redefine policies and procedures that have been set in supplier selection. Developing this systematic process will enable optimization of supplier selection and thus increasing the value for every stakeholders as the process of selection is greatly simplified. With a new redefined policy and procedure, it does not only increase the company’s effectiveness and profit, but also make it available for the company to reach greater heights in the advancement of procurement in Malaysia.

  1. Review of TESS internal controls over financial management and procurement activities. [TRW Environmental Safety Syatems (TESS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-11-25

    The Department of Energy's (DOE) civilian radioactive waste program is responsible for the safe disposal of highly radioactive nuclear waste. In February 1991, TRW Environmental Safety Systems (TESS) became the Management and operating contractor for this program. The value of the TESS contract was placed at $1 billion over a 10-year period. In October 1991, we made a review of financial controls in place at TESS. This audit was limited to an evaluation of the internal controls for financial management and procurement. We found that although TESS had made progress in establishing the necessary financial management structure, more effective controlsmore » were needed in certain areas. Specifically, TESS used a method for computing business license taxes that resulted in overpayment; they put into effect a policy to reimburse employees the maximum allowable rate for lodging rather than the actual costs; they did not always obtain the most economical airfares for travel; and, they did not utilize the most effective procurement methods. The Headquarters Procurement Office agreed with our findings and developed an action plan which addresses our recommendations.« less

  2. Review of TESS internal controls over financial management and procurement activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-11-25

    The Department of Energy`s (DOE) civilian radioactive waste program is responsible for the safe disposal of highly radioactive nuclear waste. In February 1991, TRW Environmental Safety Systems (TESS) became the Management and operating contractor for this program. The value of the TESS contract was placed at $1 billion over a 10-year period. In October 1991, we made a review of financial controls in place at TESS. This audit was limited to an evaluation of the internal controls for financial management and procurement. We found that although TESS had made progress in establishing the necessary financial management structure, more effective controlsmore » were needed in certain areas. Specifically, TESS used a method for computing business license taxes that resulted in overpayment; they put into effect a policy to reimburse employees the maximum allowable rate for lodging rather than the actual costs; they did not always obtain the most economical airfares for travel; and, they did not utilize the most effective procurement methods. The Headquarters Procurement Office agreed with our findings and developed an action plan which addresses our recommendations.« less

  3. A Novel Approach to High-Quality Postmortem Tissue Procurement: The GTEx Project.

    PubMed

    Carithers, Latarsha J; Ardlie, Kristin; Barcus, Mary; Branton, Philip A; Britton, Angela; Buia, Stephen A; Compton, Carolyn C; DeLuca, David S; Peter-Demchok, Joanne; Gelfand, Ellen T; Guan, Ping; Korzeniewski, Greg E; Lockhart, Nicole C; Rabiner, Chana A; Rao, Abhi K; Robinson, Karna L; Roche, Nancy V; Sawyer, Sherilyn J; Segrè, Ayellet V; Shive, Charles E; Smith, Anna M; Sobin, Leslie H; Undale, Anita H; Valentino, Kimberly M; Vaught, Jim; Young, Taylor R; Moore, Helen M

    2015-10-01

    The Genotype-Tissue Expression (GTEx) project, sponsored by the NIH Common Fund, was established to study the correlation between human genetic variation and tissue-specific gene expression in non-diseased individuals. A significant challenge was the collection of high-quality biospecimens for extensive genomic analyses. Here we describe how a successful infrastructure for biospecimen procurement was developed and implemented by multiple research partners to support the prospective collection, annotation, and distribution of blood, tissues, and cell lines for the GTEx project. Other research projects can follow this model and form beneficial partnerships with rapid autopsy and organ procurement organizations to collect high quality biospecimens and associated clinical data for genomic studies. Biospecimens, clinical and genomic data, and Standard Operating Procedures guiding biospecimen collection for the GTEx project are available to the research community.

  4. Deriving a Set of Privacy Specific Heuristics for the Assessment of PHRs (Personal Health Records).

    PubMed

    Furano, Riccardo F; Kushniruk, Andre; Barnett, Jeff

    2017-01-01

    With the emergence of personal health record (PHR) platforms becoming more widely available, this research focused on the development of privacy heuristics to assess PHRs regarding privacy. Existing sets of heuristics are typically not application specific and do not address patient-centric privacy as a main concern prior to undergoing PHR procurement. A set of privacy specific heuristics were developed based on a scoping review of the literature. An internet-based commercially available, vendor specific PHR application was evaluated using the derived set of privacy specific heuristics. The proposed set of privacy specific derived heuristics is explored in detail in relation to ISO 29100. The assessment of the internet-based commercially available, vendor specific PHR application indicated numerous violations. These violations were noted within the study. It is argued that the new derived privacy heuristics should be used in addition to Nielsen's well-established set of heuristics. Privacy specific heuristics could be used to assess PHR portal system-level privacy mechanisms in the procurement process of a PHR application and may prove to be a beneficial form of assessment to prevent the selection of a PHR platform with a poor privacy specific interface design.

  5. Research on noise and vibration reduction at DB to improve the environmental friendliness of railway traffic

    NASA Astrophysics Data System (ADS)

    Schulte-Werning, B.; Beier, M.; Degen, K. G.; Stiebel, D.

    2006-06-01

    One of the most prominent keywords relating to the environmental friendliness of railway traffic is noise reduction. Thus, the research and development programme "Low Noise Railway" of Deutsche Bahn (DB) is under way to treat the noise of the vehicles and infrastructure. The noise reduction of the trains and the rail/wheel system are being tackled within several projects. The direct noise experienced by railway-lineside residents due to train movements on the track can be reduced by minimising the sound radiation directly at the source. This is the first-choice solution, as it proves to be the most effective countermeasure regarding a cost-benefit relation. The limit values for the noise emission as specified in the technical specification for interoperability are an essential criterion to be confirmed during the procurement process of railway vehicles. A recently developed acoustical quality management scheme establishes systematic noise management to complete the vehicle procurement process in the phases of concept, design, construction and manufacturing. In freight traffic quiet railway wheels for block brake operation will play an important role in the future to meet the goal of a low-noise railway system. A first attempt to realise successfully the low-noise potential of such optimised wheels was performed, even if with mixed results. To show ways of reducing the noise of the cooling ventilation in locomotives, DB is a partner in a development project led by Siemens. A notable 8 dB(A) noise reduction was measured. Concerning bridge noise, a project was started based on an effective and cost-efficient combination of experiments and simulations in order to develop specifications for the construction of generic low-noise bridges.

  6. Procurement Forms | NREL

    Science.gov Websites

    Certificate of Current Cost or Pricing Data Construction Specific Forms Pre-Award Documents Construction and manuals) Cost and Pricing Data Definitions Design-Build / Price Proposal Form Information

  7. Improving donation outcomes: hospital development and the Rapid Assessment of Hospital Procurement Barriers in Donation.

    PubMed

    Siminoff, Laura A; Traino, Heather M

    2009-06-01

    Deficiencies in the donation process continue to contribute to the shortage of organs available for transplant. Continuous quality improvement of hospitals' donation processes is needed to identify and correct the problems. To test the Rapid Assessment of Hospital Procurement Barriers in Donation (RAPiD), a direct observation technique with a focused ethnographic strategy, for assessing hospitals' donation processes and identifying areas in need of continuous quality improvement interventions. A pre-post assessment of hospitals' barriers to patient identification and referral, and family consent to donation. Seventeen hospitals within the catchment area of a Northeastern organ procurement organization were assessed by using the RAPiD method. Hospital administrators, health care providers, and staff (N = 537) were interviewed as part of the assessments. Interventions, including on-site training and education, and the use of in-house coordinators, were specifically tailored to each hospital's unique set of barriers to donation. The interventions were delivered to the hospitals in the form of recommendations. The participating organ procurement organization was responsible for implementation of the interventions. The RAPiD hospital evaluations revealed gaps in respondents' knowledge of organ donation, brain death, and referral criteria; a reluctance to declare brain death; and a rocky relationship between the hospitals and the organ procurement organization. As a result of the interventions, 9 hospitals' environments for organ donation improved, 7 showed no change, and 1 was worse.

  8. Arizona TeleMedicine Network: System Procurement Specifications.

    ERIC Educational Resources Information Center

    Atlantic Research Corp., Alexandria, VA.

    Providing general specifications and system descriptions for segments within the Arizona TeleMedicine Project (a telecommunication system designed to deliver health services to rurally isolated American Indians in Arizona), this document, when used with the appropriate route segment document, will completely describe the project's required…

  9. Tuberculosis drug issues: prices, fixed-dose combination products and second-line drugs.

    PubMed

    Laing, R O; McGoldrick, K M

    2000-12-01

    Access to tuberculosis drugs depends on multiple factors. Selection of a standard list of TB drugs to procure is the first step. This paper reviews the advantages and disadvantages of procuring and using fixed-dose combination (FDC) products for both the intensive and continuation phases of treatment. The major advantages are to prevent the emergence of resistance, to simplify logistic management and to reduce costs. The major disadvantage is the need for the manufacturers to assure the quality of these FDCs by bioavailability testing. The paper reports on the inclusion of second-line TB drugs in the 1999 WHO Essential Drug List (EDL). The need to ensure that these drugs are used within established DOTS-Plus programs is stressed. The price of TB drugs is determined by many factors, including producer prices, local taxes and duties as well as mark-ups and fees. TB drug prices for both the public and private sectors from industrialized and developing countries are reported. Price trends over time are also reported. The key findings of this study are that TB drug prices have generally declined in developing countries while they have increased in developed countries, both for the public and private sectors. Prices vary between countries, with the US paying as much as 95 times the price paid in a specific developing country. The prices of public sector first-line TB drugs vary little between countries, although differences do exist due to the procurement methods used. The price of tuberculin, a diagnostic agent, has increased dramatically in the US, with substantial inter-country variations in price. The paper suggests that further research is necessary to identify the reasons for the price disparities and changes over time, and suggests methods which can be used by National Tuberculosis Programme managers to ensure availability of quality assured TB drugs at low prices.

  10. 41 CFR 101-26.506 - Interior planning and design services.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...

  11. 41 CFR 101-26.506 - Interior planning and design services.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...

  12. 41 CFR 101-26.506 - Interior planning and design services.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...

  13. 41 CFR 101-26.506 - Interior planning and design services.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...

  14. 41 CFR 101-26.506 - Interior planning and design services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interior planning and...

  15. Solution-Space Screening of a Hypersonic Endurance Demonstrator

    NASA Technical Reports Server (NTRS)

    Chudoba, Bernd; Coleman, Gary; Oza, Amit; Gonzalez, Lex; Czysz, Paul

    2012-01-01

    This report documents a parametric sizing study performed to develop a program strategy for research and development and procurement of a feasible next-generation hypersonic air-breathing endurance demonstrator. Overall project focus has been on complementing technical and managerial decision-making during the earliest conceptual design phase towards minimization of operational, technical, and managerial risks.

  16. Surface electrical properties experiment study phase, volume 3

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The reliability and quality assurance system and procedures used in developing test equipment for the Lunar Experiment projects are described. The subjects discussed include the following: (1) documentation control, (2) design review, (3) parts and materials selection, (4) material procurement, (5) inspection procedures, (6) qualification and special testing, and failure modes and effects analysis.

  17. Reflection of induced and amplified food motivation in impulse activity of the masticatory muscles during electrostimulation of the "hunger center" in the lateral hypothalamus in rabbits.

    PubMed

    Ignatova, J P; Kromin, A A

    2012-04-01

    We studied reflection of artificially induced and amplified food motivation in impulse activity of the masticatory muscles during electrostimulation of "hunger center" of the lateral hypothalamus in the absence and presence of food. The threshold stimulation of the lateral hypothalamus in hungry and satiated animals in the absence of food induced incessant food-procuring behavior paralleled by regular generation of spike bursts in masticatory muscles with biomodal distributions of intervals between pulses. This reaction of masticatory muscles during stimulation of the lateral hypothalamus in the absence of food was an example of the anticipatory reaction reflecting characteristics of the action result acceptor. Higher level of hunger motivation during threshold stimulation of the lateral hypothalamus in hungry and satiated rabbits in the course of effective food-procuring behavior increased the incidence of spike burst generation during the food capture phase, but did not modify this parameter during the chewing phase. Impulse activity of the masticatory muscles reflected convergent interactions of food motivation and support excitation on neurons of the central generator of chewing pattern.

  18. Evaluation of the national Cleanyourhands campaign to reduce Staphylococcus aureus bacteraemia and Clostridium difficile infection in hospitals in England and Wales by improved hand hygiene: four year, prospective, ecological, interrupted time series study

    PubMed Central

    Fuller, Christopher; Savage, Joan; Cookson, Barry; Hayward, Andrew; Cooper, Ben; Duckworth, Georgia; Michie, Susan; Murray, Miranda; Jeanes, Annette; Roberts, J; Teare, Louise; Charlett, Andre

    2012-01-01

    Objective To evaluate the impact of the Cleanyourhands campaign on rates of hospital procurement of alcohol hand rub and soap, report trends in selected healthcare associated infections, and investigate the association between infections and procurement. Design Prospective, ecological, interrupted time series study from 1 July 2004 to 30 June 2008. Setting 187 acute trusts in England and Wales. Intervention Installation of bedside alcohol hand rub, materials promoting hand hygiene and institutional engagement, regular hand hygiene audits, rolled out nationally from 1 December 2004. Main outcome measures Quarterly (that is, every three months) rates for each trust of hospital procurement of alcohol hand rub and liquid soap; Staphylococcus aureus bacteraemia (meticillin resistant (MRSA) and meticillin sensitive (MSSA)) and Clostridium difficile infection for each trust. Associations between procurement and infection rates assessed by mixed effect Poisson regression model (which also accounted for effect of bed occupancy, hospital type, and timing of other national interventions targeting these infections). Results Combined procurement of soap and alcohol hand rub tripled from 21.8 to 59.8 mL per patient bed day; procurement rose in association with each phase of the campaign. Rates fell for MRSA bacteraemia (1.88 to 0.91 cases per 10 000 bed days) and C difficile infection (16.75 to 9.49 cases). MSSA bacteraemia rates did not fall. Increased procurement of soap was independently associated with reduced C difficile infection throughout the study (adjusted incidence rate ratio for 1 mL increase per patient bed day 0.993, 95% confidence interval 0.990 to 0.996; P<0.0001). Increased procurement of alcohol hand rub was independently associated with reduced MRSA bacteraemia, but only in the last four quarters of the study (0.990, 0.985 to 0.995; P<0.0001). Publication of the Health Act 2006 was strongly associated with reduced MRSA bacteraemia (0.86, 0.75 to 0.98; P=0.02) and C difficile infection (0.75, 0.67 to 0.84; P<0.0001). Trust visits by Department of Health improvement teams were also associated with reduced MRSA bacteraemia (0.91, 0.83 to 0.99; P=0.03) and C difficile infection (0.80, 0.71 to 0.90; P=0.01), for at least two quarters after each visit. Conclusions The Cleanyourhands campaign was associated with sustained increases in hospital procurement of alcohol rub and soap, which the results suggest has an important role in reducing rates of some healthcare associated infections. National interventions for infection control undertaken in the context of a high profile political drive can reduce selected healthcare associated infections. PMID:22556101

  19. Evaluation of the national Cleanyourhands campaign to reduce Staphylococcus aureus bacteraemia and Clostridium difficile infection in hospitals in England and Wales by improved hand hygiene: four year, prospective, ecological, interrupted time series study.

    PubMed

    Stone, Sheldon Paul; Fuller, Christopher; Savage, Joan; Cookson, Barry; Hayward, Andrew; Cooper, Ben; Duckworth, Georgia; Michie, Susan; Murray, Miranda; Jeanes, Annette; Roberts, J; Teare, Louise; Charlett, Andre

    2012-05-03

    To evaluate the impact of the Cleanyourhands campaign on rates of hospital procurement of alcohol hand rub and soap, report trends in selected healthcare associated infections, and investigate the association between infections and procurement. Prospective, ecological, interrupted time series study from 1 July 2004 to 30 June 2008. 187 acute trusts in England and Wales. Installation of bedside alcohol hand rub, materials promoting hand hygiene and institutional engagement, regular hand hygiene audits, rolled out nationally from 1 December 2004. Quarterly (that is, every three months) rates for each trust of hospital procurement of alcohol hand rub and liquid soap; Staphylococcus aureus bacteraemia (meticillin resistant (MRSA) and meticillin sensitive (MSSA)) and Clostridium difficile infection for each trust. Associations between procurement and infection rates assessed by mixed effect Poisson regression model (which also accounted for effect of bed occupancy, hospital type, and timing of other national interventions targeting these infections). Combined procurement of soap and alcohol hand rub tripled from 21.8 to 59.8 mL per patient bed day; procurement rose in association with each phase of the campaign. Rates fell for MRSA bacteraemia (1.88 to 0.91 cases per 10,000 bed days) and C difficile infection (16.75 to 9.49 cases). MSSA bacteraemia rates did not fall. Increased procurement of soap was independently associated with reduced C difficile infection throughout the study (adjusted incidence rate ratio for 1 mL increase per patient bed day 0.993, 95% confidence interval 0.990 to 0.996; P < 0.0001). Increased procurement of alcohol hand rub was independently associated with reduced MRSA bacteraemia, but only in the last four quarters of the study (0.990, 0.985 to 0.995; P < 0.0001). Publication of the Health Act 2006 was strongly associated with reduced MRSA bacteraemia (0.86, 0.75 to 0.98; P = 0.02) and C difficile infection (0.75, 0.67 to 0.84; P < 0.0001). Trust visits by Department of Health improvement teams were also associated with reduced MRSA bacteraemia (0.91, 0.83 to 0.99; P=0.03) and C difficile infection (0.80, 0.71 to 0.90; P=0.01), for at least two quarters after each visit. The Cleanyourhands campaign was associated with sustained increases in hospital procurement of alcohol rub and soap, which the results suggest has an important role in reducing rates of some healthcare associated infections. National interventions for infection control undertaken in the context of a high profile political drive can reduce selected healthcare associated infections.

  20. Feed-pump hydraulic performance and design improvement, Phase I: research program design. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, W.H.; Gopalakrishnan, S.; Fehlau, R.

    1982-03-01

    As a result of prior EPRI-sponsored studies, it was concluded that a research program should be designed and implemented to provide an improved basis for the design, procurement, testing, and operation of large feed pumps with increased reliability and stability over the full range of operating conditions. This two-volume report contains a research plan which is based on a review of the present state of the art and which defines the necessary R and D program and estimates the benefits and costs of the program. The recommended research program consists of 30 interrelated tasks. It is designed to perform themore » needed research; to verify the results; to develop improved components; and to publish computer-aided design methods, pump specification guidelines, and a troubleshooting manual. Most of the technology proposed in the research plan is applicable to nuclear power plants as well as to fossil-fired plants. This volume contains appendixes on pump design, cavitation damage, performance testing, hydraulics, two-phase flow in pumps, flow stability, and rotor dynamics.« less

  1. Title I preliminary engineering for: A. S. E. F. solid waste to methane gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1976-01-01

    An assignment to provide preliminary engineering of an Advanced System Experimental Facility for production of methane gas from urban solid waste by anaerobic digestion is documented. The experimental facility will be constructed on a now-existing solid waste shredding and landfill facility in Pompano Beach, Florida. Information is included on: general description of the project; justification of basic need; process design; preliminary drawings; outline specifications; preliminary estimate of cost; and time schedules for design and construction of accomplishment of design and construction. The preliminary cost estimate for the design and construction phases of the experimental program is $2,960,000, based on Dec.more » 1975 and Jan. 1976 costs. A time schedule of eight months to complete the Detailed Design, Equipment Procurement and the Award of Subcontracts is given.« less

  2. Governing the postmortem procurement of human body material for research.

    PubMed

    Van Assche, Kristof; Capitaine, Laura; Pennings, Guido; Sterckx, Sigrid

    2015-03-01

    Human body material removed post mortem is a particularly valuable resource for research. Considering the efforts that are currently being made to study the biochemical processes and possible genetic causes that underlie cancer and cardiovascular and neurodegenerative diseases, it is likely that this type of research will continue to gain in importance. However, post mortem procurement of human body material for research raises specific ethical concerns, more in particular with regard to the consent of the research participant. In this paper, we attempt to determine which consent regime should govern the post mortem procurement of body material for research. In order to do so, we assess the various arguments that could be put forward in support of a duty to make body material available for research purposes after death. We argue that this duty does in practice not support conscription but is sufficiently strong to defend a policy of presumed rather than explicit consent.

  3. Guidelines for the Procurement of Aerospace Nickel Cadmium Cells

    NASA Technical Reports Server (NTRS)

    Thierfelder, Helmut

    1997-01-01

    NASA has been using a Modular Power System containing "standard" nickel cadmium (NiCd) batteries, composed of "standard" NiCd cells. For many years the only manufacturer of the NASA "standard" NiCd cells was General Electric Co. (subsequently Gates Aerospace and now SAFT). This standard cell was successfully used in numerous missions. However, uncontrolled technical changes, and changes in industrial restructuring require a new approach. General Electric (now SAFT Aerospace Batteries) had management changes, new manufacturers entered the market (Eagle-Picher Industries, ACME Electric Corporation, Aerospace Division, Sanyo Electric Co.) and battery technology advanced. New NASA procurements for aerospace NiCd cells will have specifications unique to the spacecraft and mission requirements. This document provides the user/customer guidelines for the new approach to procuring of and specifying performance requirements for highly reliable NiCd cells and batteries. It includes details of key parameters and their importance. The appendices contain a checklist, detailed calculations, and backup information.

  4. Postmortem sperm procurement: a legal perspective.

    PubMed

    Kahan, S E; Seftel, A D; Resnick, M I

    1999-06-01

    Postmortem sperm procurement with subsequent artificial insemination has become a technically feasible method for posthumous conception. A variety of legal questions exist involving the rights and relationships of the deceased, his family and his issue. We addressed these questions and designed a workable protocol for postmortem sperm procurement. MEDLINE, WESTLAW and LEXIS medical literature, and case law searches were conducted. United States and international case law, United States (federal and state) statutes, Uniform Law Commissions Acts, and law review commentaries and articles were reviewed. While postmortem sperm procurement is being requested throughout the United States, no standard protocol or procedural guidelines have been established by federal or state statute. Furthermore, the courts have not yet addressed this specific scenario in reported case law. Statutes and case law do address related factual scenarios and issues, including property rights in human bodies, rules governing transplantation of human organs/body parts, rights of parties in in vivo sperm bank donations and responsibilities of parents to the conceptus of artificial insemination. A workable protocol can be established by analyzing case law and statutes addressing factually similar scenarios. Urologists must focus on the express intent of the decedent and limit any postmortem sperm retrieval to the specific requests made by the decedent. Decedent requests should be documented in writing. The decedent must be competent and of majority age. In the absence of decedent expressed affirmative directive calling for sperm retrieval, no other relative or guardian may authorize this retrieval. Issues regarding the legitimacy and inheritance rights of the conceptus will most consistently be addressed when explicitly provided for in the will of the decedent.

  5. Method for procuring specific populations of viable human prostate cells for research.

    PubMed

    Fischer, A H; Philips, A; Taysavang, P; McKenney, J K; Amin, M B

    2001-04-01

    A wider range of research can be conducted on viable tissue samples than on fixed or frozen samples. A major obstacle to studying viable prostate tissue samples is the inability to accurately identify cancer on direct examination of unembedded tissue. We used a dissecting microscope to identify cancer in unfixed prostate tissue samples stained on the cut surface with 0.5% aqueous toluidine blue. We measured the diagnostic accuracy of this technique in 25 consecutive prostatectomies, determined the viability of procured samples, and estimated the effect on final pathologic assessment. Both surfaces of a 3- to 5-mm thick cross-section taken midway between base and apex of the prostate were examined. A 4-mm punch biopsy was directed to one benign and one malignant area when clearly present. The dissecting microscope allowed clearcut recognition of carcinoma in 17 of the 25 cross-sections, and carcinoma was confirmed in all 17 (100%). In 8 of 25 cases, no procurement was attempted because no carcinoma was evident in the one cross-section studied. Twenty of 25 cross-sections were adequate for benign tissue procurement; five of the cross-sections were not suitable for procurement because of the presence of extensive carcinoma or atrophy. Seventeen of the 20 were accurately diagnosed as benign (85%); one showed pseudohyperplastic adenocarcinoma, one showed focal high-grade prostatic intraepithelial neoplasia, and one showed urothelial carcinoma in situ. Prostatic epithelium obtained with the technique remains viable and can be separated from stroma. The dissecting microscope technique appears to facilitate rather than interfere with accurate pathologic assessment: extraprostatic extension or positive margins were correctly identified during tissue procurement in three cases. The procedure takes only about 30 minutes.

  6. Qualitative analysis of vendor discussions on the procurement of Computerised Physician Order Entry and Clinical Decision Support systems in hospitals

    PubMed Central

    Cresswell, Kathrin M; Lee, Lisa; Slee, Ann; Coleman, Jamie; Bates, David W; Sheikh, Aziz

    2015-01-01

    Objectives We studied vendor perspectives about potentially transferable lessons for implementing organisations and national strategies surrounding the procurement of Computerised Physician Order Entry (CPOE)/Clinical Decision Support (CDS) systems in English hospitals. Setting Data were collected from digitally audio-recorded discussions from a series of CPOE/CDS vendor round-table discussions held in September 2014 in the UK. Participants Nine participants, representing 6 key vendors operating in the UK, attended. The discussions were transcribed verbatim and thematically analysed. Results Vendors reported a range of challenges surrounding the procurement and contracting processes of CPOE/CDS systems, including hospitals’ inability to adequately assess their own needs and then select a suitable product, rushed procurement and implementation processes that resulted in difficulties in meaningfully engaging with vendors, as well as challenges relating to contracting leading to ambiguities in implementation roles. Consequently, relationships between system vendors and hospitals were often strained, the vendors attributing this to a lack of hospital management's appreciation of the complexities associated with implementation efforts. Future anticipated challenges included issues surrounding the standardisation of data to enable their aggregation across systems for effective secondary uses, and implementation of data exchange with providers outside the hospital. Conclusions Our results indicate that there are significant issues surrounding capacity to procure and optimise CPOE/CDS systems among UK hospitals. There is an urgent need to encourage more synergistic and collaborative working between providers and vendors and for a more centralised support for National Health Service hospitals, which draws on a wider body of experience, including a formalised procurement framework with value-based product specifications. PMID:26503385

  7. The personal computer and GP-B management. [Gravity Probe experiment

    NASA Technical Reports Server (NTRS)

    Neighbors, A. K.

    1986-01-01

    The Gravity Probe-B (GP-B) experiment is one of the most sophisticated and challenging developments to be undertaken by NASA. Its objective is to measure the relativistic drift of gyroscopes in orbit about the earth. In this paper, the experiment is described, and the strategy of phased procurements for accomplishing the engineering development of the hardware is discussed. The microcomputer is a very convenient and powerful tool in the management of GP-B. It is used in creating and monitoring such project data as schedules, budgets, hardware procurements and technical and interface requirements. Commercially available software in word processing, database management, communications, spreadsheet, graphics and program management are used. Examples are described of the efficacy of the application of the computer by the management team.

  8. 32 CFR 32.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... acceptable characteristics or minimum acceptable standards. (iv) The specific features of “brand name or... expected to exceed the simplified acquisition threshold, specifies a “brand name” product. (4) The proposed...

  9. Computerized engineering logic for nuclear procurement and dedication processes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tulay, M.P.

    1996-12-31

    In an attempt to better meet the needs of operations and maintenance organizations, many nuclear utility procurement engineering groups have simplified their procedures, developed on-line tools for performing the specification of replacement items, and developed relational databases containing part-level information necessary to automate the procurement process. Although these improvements have helped to reduce the engineering necessary to properly specify and accept/dedicate items for nuclear safety-related applications, a number of utilities have recognized that additional long-term savings can be realized by integrating a computerized logic to assist technical procurement engineering personnel. The most commonly used logic follows the generic processes containedmore » in Electric Power Research Institute (EPRI) published guidelines. The processes are typically customized to some extent to accommodate each utility`s organizational structure, operating procedures, and strategic goals. This paper will discuss a typical logic that integrates the technical evaluation, acceptance, and receipt inspection and testing processes. The logic this paper will describe has been successfully integrated at a growing number of nuclear utilities and has produced numerous positive results. The application of the logic ensures that utility-wide standards or procedures, common among multi-site utilities, are followed.« less

  10. Development of standardized specifications for silicon solar cells

    NASA Technical Reports Server (NTRS)

    Scott-Monck, J. A.

    1977-01-01

    A space silicon solar cell assembly (cell and coverglass) specification aimed at standardizing the diverse requirements of current cell or assembly specifications was developed. This specification was designed to minimize both the procurement and manufacturing costs for space qualified silicon solar cell assembilies. In addition, an impact analysis estimating the technological and economic effects of employing a standardized space silicon solar cell assembly was performed.

  11. 40 CFR 35.4235 - Are there specific provisions my group's contract(s) must contain?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4235 Are there specific... progress reports; (3) Expenditures; and (4) Commitments indicating their relationship to established costs...

  12. 48 CFR 3025.7002-3 - Specific application of trade agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... trade agreements. 3025.7002-3 Section 3025.7002-3 Federal Acquisition Regulations System DEPARTMENT OF... ACQUISITION 3025.7002-3 Specific application of trade agreements. (a) For covered items entitled to non-discriminatory treatment under the World Trade Organization Agreement on Government Procurement (WTO GPA), or any...

  13. 7 CFR 1728.70 - Procurement of materials.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...

  14. 7 CFR 1728.70 - Procurement of materials.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...

  15. 7 CFR 1728.70 - Procurement of materials.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...

  16. 7 CFR 1728.70 - Procurement of materials.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...

  17. 7 CFR 1728.70 - Procurement of materials.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...

  18. Construction Management for Educational Facilities: Professional Services' Procurement and Competitive Bid Statutes.

    ERIC Educational Resources Information Center

    Goldblatt, Steven M.; Wood, R. Craig

    Construction management is utilized when a school district engages a firm to coordinate a total project. The construction management seeks to save an owner time and cost primarily through better contractor coordination and project management. These services may include the planning and design phases of the project as well as the actual…

  19. Variable Cost to Procure

    DTIC Science & Technology

    1981-03-12

    Procurement Work Directive ( PWV ) Procurement Army, CostL to Procure Cost Differential Secondary (PAS) Cost to Buy Economic Order Quantity Procurement...and Assignment of Buyer h. Solicitation Fffort . ) (1) Procurement Planning ( ) ( ) (?) PWV Review and Small Business Coordination ( (3) Determination

  20. Impact of interfacial imperfection on transverse wave in a functionally graded piezoelectric material structure with corrugated boundaries

    NASA Astrophysics Data System (ADS)

    Kumar Singh, Abhishek; Kumar, Santan; Kumari, Richa

    2018-03-01

    The propagation behavior of Love-type wave in a corrugated functionally graded piezoelectric material layered structure has been taken into account. Concretely, the layered structure incorporates a corrugated functionally graded piezoelectric material layer imperfectly bonded to a functionally graded piezoelectric material half-space. An analytical treatment has been employed to determine the dispersion relation for both cases of electrically open condition and electrically short condition. The phase velocity of the Love-type wave has been computed numerically and its dependence on the wave number has been depicted graphically for a specific type of corrugated boundary surfaces for both said conditions. The crux of the study lies in the fact that the imperfect bonding of the interface, the corrugated boundaries present in the layer, and the material properties of the layer and the half-space strongly influence the phase velocity of the Love-type wave. It can be remarkably noted that the imperfect bonding of the interface reduces the phase velocity of the Love-type wave significantly. As a special case of the problem, it is noticed that the procured dispersion relation for both cases of electrically open and electrically short conditions is in accordance with the classical Love wave equation.

  1. Procurement of a more efficient railroad system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detmold, P.J.

    An analysis of how new technology penetrates the railroad system and who initiates the changes suggests ways for improving the procedures. The author identifies a six-step process in transport development which includes invention, innovation, information dissemination, and persuasion. He concludes that poor economic justification and the lack of capital explain the low rate of equipment replacement. The nature of the market and the need for standardized specification appear to influence procurement changes, but both suppliers and transport operators must be convinced of the need for change. The Advanced Train Control Systems Project illustrates how the initiation process works.

  2. The co-existence of life and death for the perioperative nurse.

    PubMed

    Perrin, Karen; Jones, Barbara; Winkelman, Cecelia

    2013-10-01

    Death and life co-exist in organ procurement surgery; untimely death for one provides hope for continued life for others. Drawing from interactionist theory, the impact of personal and environmental forces and functions specific to organ procurement surgery were examined. Seven nurses (6 women, 1 man aged 34-58 years) were provided with an opportunity to describe their experiences. Three core themes emerged from the qualitative analysis of the interviews: existential issues, coping strategies, and support for each other. Nurses spoke of ways in which they contribute to this challenging work and draw on inner resources.

  3. Critical appraisal of organ procurement under Maastricht 3 condition.

    PubMed

    Puybasset, L; Bazin, J-E; Beloucif, S; Bizouarn, P; Crozier, S; Devalois, B; Eon, B; Fieux, F; Gisquet, E; Guibet-Lafaye, C; Kentish, N; Lienhart, A; Nicolas-Robin, A; Otero Lopez, M; Pelluchon, C; Roussin, F; Beydon, L

    2014-02-01

    The ethics committee of the French Society of Anesthesia and Intensive Care (Sfar) has been requested by the French Biomedical Agency to consider the issue of organ donation in patients after the decision to withdraw life-supportive therapies has been taken. This type of organ donation is performed in the USA, Canada, the United Kingdom, the Netherlands and Belgium. The three former countries have published recommendations formalizing procedures and operations. The French Society of Anesthesia and Intensive Care (Société française d'anesthésie et de reanimation [Sfar]) ethics committee has considered this issue and envisioned the different aspects of the whole process. Consequently, it sounded a note of caution regarding the applicability of this type of organ procurement in unselected patients following a decision to withdraw life-supportive therapies. According to French regulations concerning organ procurement in brain-dead patients, the committee stresses the need to restrict this specific way of procurement to severely brain-injured patients, once confirmatory investigations predicting a catastrophic prognosis have been performed. This suggests that the nature of the confirmatory investigation required should be formalized by the French Biomedical Agency on behalf of the French parliamentarians, which should help preserve population trust regarding organ procurement and provide a framework for medical decision. This text has been endorsed by the Sfar. Copyright © 2013 Société française d’anesthésie et de réanimation (Sfar). Published by Elsevier SAS. All rights reserved.

  4. 14 CFR 29.621 - Casting factors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...

  5. 14 CFR 27.621 - Casting factors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...

  6. 14 CFR 29.621 - Casting factors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...

  7. 14 CFR 27.621 - Casting factors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...

  8. Green Power Partnership Program Initiatives

    EPA Pesticide Factsheets

    EPA's Green Power Partnership has a number of initiatives that focus on the collective green power efforts within specific sectors and renewable energy procurement strategies, which provide recognition opportunities for Partners and increase awareness.

  9. Development of an All-Metal Thick Film Cost Effective Metallization System for Solar Cells

    NASA Technical Reports Server (NTRS)

    Ross, B.

    1980-01-01

    Materials including copper powders, silver-fluoride, and silicon wafers were procured and copper pastes were prepared. Electrodes made with copper pastes were analyzed and compared with the raw materials. A needle-like structure was observed on the electroded solar cells, and was identified as eutectic copper-silicon by electron probe X-ray spectroscopy. The existence of this phase was thought to benefit electrical and metallurgical properties of the contact. Subsequently electrodes made from new material were also shown to contain this phase while simultaneously having poor adhesion.

  10. 45 CFR 74.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... specific features of “brand name or equal” descriptions that bidders are required to meet when such items... “brand name” product. (4) The proposed award over the simplified acquisition threshold is to be awarded...

  11. 38 CFR 49.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... standards. (iv) The specific features of “brand name or equal” descriptions that bidders are required to... threshold, specifies a “brand name” product. (4) The proposed award over the small purchase threshold is to...

  12. 40 CFR 30.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... characteristics or minimum acceptable standards. (iv) The specific features of “brand name or equal” descriptions..., specifies a “brand name” product. (4) The proposed award over the small purchase threshold is to be awarded...

  13. 22 CFR 145.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... characteristics or minimum acceptable standards. (iv) The specific features of “brand name or equal” descriptions... “brand name” product. (4) The proposed award over the small purchase limitation is to be awarded to other...

  14. 22 CFR 201.22 - Procurement under public sector procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...-restrictive manner and in sufficient detail to permit maximum response from prospective suppliers. The metric system of measurements shall be used for specifications unless USAID determines in writing that such use...

  15. 22 CFR 201.22 - Procurement under public sector procedures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...-restrictive manner and in sufficient detail to permit maximum response from prospective suppliers. The metric system of measurements shall be used for specifications unless USAID determines in writing that such use...

  16. 22 CFR 201.22 - Procurement under public sector procedures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...-restrictive manner and in sufficient detail to permit maximum response from prospective suppliers. The metric system of measurements shall be used for specifications unless USAID determines in writing that such use...

  17. 22 CFR 201.22 - Procurement under public sector procedures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...-restrictive manner and in sufficient detail to permit maximum response from prospective suppliers. The metric system of measurements shall be used for specifications unless USAID determines in writing that such use...

  18. WHO Expert Committee on Specifications for Pharmaceutical Preparations.

    PubMed

    2014-01-01

    The Expert Committee on Specifications for Pharmaceutical Preparations works towards clear, independent and practical standards and guidelines for the quality assurance of medicines. Standards are developed by the Committee through worldwide consultation and an international consensus-building process. The following new guidelines were adopted and recommended for use, in addition to 20 monographs and general texts for inclusion in The International Pharmacopoeia and 11 new International Chemical Reference Substances. The International Pharmacopoeia--updating mechanism for the section on radiopharmaceuticals; WHO good manufacturing practices for pharmaceutical products: main principles; Model quality assurance system for procurement agencies; Assessment tool based on the model quality assurance system for procurement agencies: aide-memoire for inspection; Guidelines on submission of documentation for prequalification of finished pharmaceutical products approved by stringent regulatory authorities; and Guidelines on submission of documentation for a multisource (generic) finished pharmaceutical product: quality part.

  19. Homeopathic treatment in emergency medicine: a case series.

    PubMed

    Oberbaum, M; Schreiber, R; Rosenthal, C; Itzchaki, M

    2003-01-01

    Following a multiple-casualty construction disaster in Israel, members of The Center of Integrated Complementary Medicine joined in the emergency activity of the Shaare Zedek Medical Center. They administered homeopathic treatment to injured patients to supplement conventional orthopaedic treatment. This was to our knowledge the first time that complementary medicine had been used officially in conjunction with conventional medicine in an emergency situation. Our objective is to report and summarize the rationale, procedures and outcome of the complementary medicine intervention. Fifteen orthopaedic patients were included. They were treated by homeopathy in two phases starting 24 h post-trauma. All patients initially received Arnica montana 200CH in a single dose. Anxiety was treated with Aconite 200CH in nine patients, Opium 200CH in three, Ignatia 200CH in two and Arsenicum album 200CH in one according to type of anxiety. One day later, most patients reported a lessening of pain, 58% felt improvement, 89% had reduced anxiety, and overall, 61% felt that homeopathic treatment was helpful. In the second phase, 48 h post-trauma, specific complaints were addressed with classical homeopathy. At discharge patients rated the homeopathic treatment successful in 67% of the specific complaints. Several issues relating to the use of homeopathy in emergency medicine and its relation to conventional treatment are discussed. These include compliance, the conduct of rounds, shortage of time and staff, and the procurement of medicines.

  20. E-ELT requirements management

    NASA Astrophysics Data System (ADS)

    Schneller, D.

    2014-08-01

    The E-ELT has completed its design phase and is now entering construction. ESO is acting as prime contractor and usually procures subsystems, including their design, from industry. This, in turn, leads to a large number of requirements, whose validity, consistency and conformity with user needs requires extensive management. Therefore E-ELT Systems Engineering has chosen to follow a systematic approach, based on a reasoned requirement architecture that follows the product breakdown structure of the observatory. The challenge ahead is the controlled flow-down of science user needs into engineering requirements, requirement specifications and system design documents. This paper shows how the E-ELT project manages this. The project has adopted IBM DOORTM as a supporting requirements management tool. This paper deals with emerging problems and pictures potential solutions. It shows trade-offs made to reach a proper balance between the effort put in this activity and potential overheads, and the benefit for the project.

  1. 13 CFR 126.607 - When must a contracting officer set aside a requirement for qualified HUBZone SBCs?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... and award will be made at fair market prices. However, after conducting market research, the... rationale used to support the specific set-aside, including the type and extent of market research conducted... market research, programmatic needs specific to the procuring agency, anticipated award price, and the...

  2. Annual Procurement Report, Fiscal Year 1997

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1997. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during Fiscal Year 1997. However, these larger procurements accounted for only 43 percent of the total actions. Procurement action, as used in this report means contractual actions to obtain supplies, services or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or termination's to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract. The Annual Procurement Report is also available via the internet on the Procurement homepage.

  3. 78 FR 46239 - Designations of Chief Acquisition Officer and Senior Procurement Executive

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Designations of Chief Acquisition Officer and Senior Procurement Executive and Delegation of Procurement... No. FR-5701-D-01] Designations of Chief Acquisition Officer and Senior Procurement Executive AGENCY... Procurement Officer as the Senior Procurement Executive. DATES: Effective Date: July 24, 2013. FOR FURTHER...

  4. 48 CFR 752.225-71 - Local procurement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...

  5. 48 CFR 752.225-71 - Local procurement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...

  6. Ultraviolet Communication for Medical Applications

    DTIC Science & Technology

    2015-06-01

    DEI procured several UVC phosphors and tested them with vacuum UV (VUV) excitation. Available emission peaks include: 226 nm, 230 nm, 234 nm, 242...SUPPLEMENTARY NOTES Report contains color. 14. ABSTRACT Under this Phase II SBIR effort, Directed Energy Inc.’s (DEI) proprietary ultraviolet ( UV ...15. SUBJECT TERMS Non-line-of-sight (NLOS), networking, optical communication, plasma-shells, short range, ultraviolet ( UV ) light 16. SECURITY

  7. Large space telescope engineering scale model optical design

    NASA Technical Reports Server (NTRS)

    Facey, T. A.

    1973-01-01

    The objective is to develop the detailed design and tolerance data for the LST engineering scale model optical system. This will enable MSFC to move forward to the optical element procurement phase and also to evaluate tolerances, manufacturing requirements, assembly/checkout procedures, reliability, operational complexity, stability requirements of the structure and thermal system, and the flexibility to change and grow.

  8. Superintendents' Perceptions about Social Distance, Succession, and "Sunset" Provisions for Asian, Latino, and Native American Candidates Seeking Building-Level Administrator Positions

    ERIC Educational Resources Information Center

    Young, I. Phillip; De La Torre, Guadalupe Xavier

    2006-01-01

    Research addressing the attraction and selection of individuals for administrator positions is encapsulated in a structural model that depicts different phases of the employee procurement process. Within the present study, attention is devoted to the prescreening stage of the selection process, and screening decisions of superintendents are…

  9. Electrical Ground Support Equipment Fabrication, Specification for

    NASA Technical Reports Server (NTRS)

    Denson, Erik C.

    2014-01-01

    This document specifies parts, materials, and processes used in the fabrication, maintenance, repair, and procurement of electrical and electronic control and monitoring equipment associated with ground support equipment (GSE) at the Kennedy Space Center (KSC).

  10. Design data brochure: SIMS prototype system 3

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A closed hydronic solar system is reported for space and hot water heating. Design, performance, and hardware specifications are presented sufficient for architectural engineers and contractors to procure, install, operate, and maintain a similar solar application.

  11. 13 CFR 121.1007 - Must a protest of size status relate to a particular procurement and be specific?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... contracts in excess of $5 million last year is sufficiently specific. [61 FR 3286, Jan. 31, 1996, as amended... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Must a protest of size status... following are examples of allegation specificity: Example 1: An allegation that concern X is large because...

  12. 13 CFR 121.1007 - Must a protest of size status relate to a particular procurement and be specific?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... contracts in excess of $5 million last year is sufficiently specific. [61 FR 3286, Jan. 31, 1996, as amended... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Must a protest of size status... following are examples of allegation specificity: Example 1: An allegation that concern X is large because...

  13. 13 CFR 121.1007 - Must a protest of size status relate to a particular procurement and be specific?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... contracts in excess of $5 million last year is sufficiently specific. [61 FR 3286, Jan. 31, 1996, as amended... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Must a protest of size status... following are examples of allegation specificity: Example 1: An allegation that concern X is large because...

  14. 13 CFR 121.1007 - Must a protest of size status relate to a particular procurement and be specific?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... contracts in excess of $5 million last year is sufficiently specific. [61 FR 3286, Jan. 31, 1996, as amended... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Must a protest of size status... following are examples of allegation specificity: Example 1: An allegation that concern X is large because...

  15. 13 CFR 121.1007 - Must a protest of size status relate to a particular procurement and be specific?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contracts in excess of $5 million last year is sufficiently specific. [61 FR 3286, Jan. 31, 1996, as amended... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Must a protest of size status... following are examples of allegation specificity: Example 1: An allegation that concern X is large because...

  16. Organ procurement expenditures and the role of financial incentives.

    PubMed

    Evans, R W

    To evaluate the billed charges for organ procurement and to consider the role of financial incentives to encourage organ donation. Observational study. Data were obtained on donor organ acquisition charges from a random sample of kidney, heart, liver, heart-lung, and pancreas transplants. The data were based on 28.7% of all transplants performed in the United States in 1988. Total charges for donor organ acquisition. The median charges (1988 dollars) for donor organs were as follows: kidney, $12,290; heart, $12,578; liver, $16,281; heart-lung, $12,028; and pancreas, $15,400. Since 1983, kidney acquisition charges have increased by 12.9%, heart charges by 64.1%, and liver charges by 61.8%, after adjusting for inflation. Between 9% and 31% of total transplant procedure-specific charges were associated with donor organ acquisition. There is wide unexplained variation in organ procurement charges. Data on actual costs are required to establish the appropriateness of current charges. Prevailing billing and payment methods should be reevaluated in an effort to address a variety of issues related to reimbursement. Current payment methods may actually contribute to cost inefficiency. Finally, while financial incentives may enhance the efficiency of organ procurement efforts, they will adversely affect the cost-effectiveness of transplantation.

  17. Atmospheric, Magnetospheric and Plasmas in Space (AMPS) spacelab payload definition study; volume 4: Part 2, Labcraft payload general specification

    NASA Technical Reports Server (NTRS)

    Keeley, J. T.

    1976-01-01

    The Labcraft Payload General Specification (LPGS) amplifies those general requirements in the Labcraft Program Specification (LPS) to ensure that all hardware, software, and STS elements will successfully function as an integrated system to accomplish the objectives of the first Labcraft mission. Contract End Item Specifications (CEIS) and Procurement Drawings (PDs) prepared and implemented for all deliverable hardware and software elements are discussed.

  18. NASA procurement report, FY 1992

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during the first six months of Fiscal Year 1992. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during the first six months of Fiscal Year 1992. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplementary agreements, change orders, or terminations to a contract that change the total amount of funds obligated.

  19. Marketing human organs: the autonomy paradox.

    PubMed

    Marshall, P A; Thomasma, D C; Daar, A S

    1996-03-01

    The severe shortage of organs for transplantation and the continual reluctance of the public to voluntarily donate has prompted consideration of alternative strategies for organ procurement. This paper explores the development of market approaches for procuring human organs for transplantation and considers the social and moral implications of organ donation as both a "gift of life" and a "commodity exchange." The problematic and paradoxical articulation of individual autonomy in relation to property rights and marketing human body parts is addressed. We argue that beliefs about proprietorship over human body parts and the capacity to provide consent for organ donation are culturally constructed. We contend that the political and economic framework of biomedicine, in western and non-western nations, influences access to transplantation technology and shapes the form and development of specific market approaches. Finally, we suggest that marketing approaches for organ procurement are and will be negotiated within cultural parameters constrained by several factors: beliefs about the physical body and personhood, religious traditions, economic conditions, and the availability of technological resources.

  20. The Danish Organic Action Plan 2020: assessment method and baseline status of organic procurement in public kitchens.

    PubMed

    Sørensen, Nina N; Lassen, Anne D; Løje, Hanne; Tetens, Inge

    2015-09-01

    With political support from the Danish Organic Action Plan 2020, organic public procurement in Denmark is expected to increase. In order to evaluate changes in organic food procurement in Danish public kitchens, reliable methods are needed. The present study aimed to compare organic food procurement measurements by two methods and to collect and discuss baseline organic food procurement measurements from public kitchens participating in the Danish Organic Action Plan 2020. Comparison study measuring organic food procurement by applying two different methods, one based on the use of procurement invoices (the Organic Cuisine Label method) and the other on self-reported procurement (the Dogme method). Baseline organic food procurement status was based on organic food procurement measurements and background information from public kitchens. Public kitchens participating in the six organic food conversion projects funded by the Danish Organic Action Plan 2020 during 2012 and 2013. Twenty-six public kitchens (comparison study) and 345 public kitchens (baseline organic food procurement status). A high significant correlation coefficient was found between the two organic food procurement measurement methods (r=0·83, P<0·001) with measurements relevant for the baseline status. Mean baseline organic food procurement was found to be 24 % when including measurements from both methods. The results indicate that organic food procurement measurements by both methods were valid for the baseline status report of the Danish Organic Action Plan 2020. Baseline results in Danish public kitchens suggest there is room for more organic as well as sustainable public procurement in Denmark.

  1. 40 CFR 40.145-3 - Projects involving construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... competition. “Brand name or equal” description may be used as a means to define the performance or other salient requirements of a procurement, and when so used the specific features of the named brand which...

  2. EPA Solar Utilization in Higher Education Networking and Information Sharing Group

    EPA Pesticide Factsheets

    EPA's Green Power Partnership has a number of initiatives that focus on the collective green power efforts within specific sectors and renewable energy procurement strategies, which provide recognition opportunities for Partners and increase awareness.

  3. Truck side guard specifications : recommended standard

    DOT National Transportation Integrated Search

    2016-09-01

    This document is intended to be used by (1) public or private medium/heavy-duty truck fleets considering adding side guards; (2) jurisdictions or customers that require side guards through policy or procurement; (3) manufacturers of side guards; and ...

  4. FGC Webinar: Simplifying Sustainable Purchasing Through Guidelines and Standards

    EPA Pesticide Factsheets

    This Webinar covered EPA’s effort to simplify green purchasing through recommendations of specifications, standards, and ecolabels. EPA’s work in this area is intended to help federal purchasers identify and procure environmentally sustainable products.

  5. Plutonium Finishing Plant (PFP) HVAC System Component Index

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DICK, J.D.

    2000-02-28

    The Plutonium Finishing Plant (PFP) WAC System includes sub-systems 25A through 25K. Specific system boundaries and justifications are contained in HNF-SD-CP-SDD-005, ''Definition and Means of Maintaining the Ventilation System Confinement Portion of the PFP Safety Envelope.'' The procurement requirements associated with the system necessitates procurement of some system equipment as Commercial Grade Items in accordance with HNF-PRO-268, ''Control of Purchased Items and Services.'' This document lists safety class and safety significant components for the Heating Ventilation Air Conditioning and specifies the critical characteristics for Commercial Grade Items, as required by HNF-PRO-268 and HNF-PRO-1819. These are the minimum specifications that themore » equipment must meet in order to properly perform its safety function. There may be several manufacturers or models that meet the critical characteristics for any one item.« less

  6. NASA procurement report, FY 1993

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during fiscal year 1993. The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during fiscal year 1993. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractural actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.

  7. The MUSE project face to face with reality

    NASA Astrophysics Data System (ADS)

    Caillier, P.; Accardo, M.; Adjali, L.; Anwand, H.; Bacon, Roland; Boudon, D.; Brotons, L.; Capoani, L.; Daguisé, E.; Dupieux, M.; Dupuy, C.; François, M.; Glindemann, A.; Gojak, D.; Hansali, G.; Hahn, T.; Jarno, A.; Kelz, A.; Koehler, C.; Kosmalski, J.; Laurent, F.; Le Floch, M.; Lizon, J.-L.; Loupias, M.; Manescau, A.; Migniau, J. E.; Monstein, C.; Nicklas, H.; Parès, L.; Pécontal-Rousset, A.; Piqueras, L.; Reiss, R.; Remillieux, A.; Renault, E.; Rupprecht, G.; Streicher, O.; Stuik, R.; Valentin, H.; Vernet, J.; Weilbacher, P.; Zins, G.

    2012-09-01

    MUSE (Multi Unit Spectroscopic Explorer) is a second generation instrument built for ESO (European Southern Observatory) to be installed in Chile on the VLT (Very Large Telescope). The MUSE project is supported by a European consortium of 7 institutes. After the critical turning point of shifting from the design to the manufacturing phase, the MUSE project has now completed the realization of its different sub-systems and should finalize its global integration and test in Europe. To arrive to this point many challenges had to be overcome, many technical difficulties, non compliances or procurements delays which seemed at the time overwhelming. Now is the time to face the results of our organization, of our strategy, of our choices. Now is the time to face the reality of the MUSE instrument. During the design phase a plan was provided by the project management in order to achieve the realization of the MUSE instrument in specification, time and cost. This critical moment in the project life when the instrument takes shape and reality is the opportunity to look not only at the outcome but also to see how well we followed the original plan, what had to be changed or adapted and what should have been.

  8. Definitional-mission report: Combined-cycle power plant, Sultan Iskandar Power Station Phase 2-B, Tenaga Nasional BHD, Malaysia. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kadagathur, G.

    1990-12-10

    Tenaga Nasional BHD (TEN) formerly known as National Electricity Board of Malaysia is proposing to construct a Combined Cycle Power Plant at Pasir Gudang. The project is known as Sultan Iskandar Power Station Phase 2 (SIPS-2). U.S. engineering companies and U.S. equipment manufacturers are having difficulty in procuring contracts from the Malaysian Power Industry. To date, the industry is dominated by consortia with British and Swiss participation. Several U.S. engineering companies have approached the US Trade and Development Program (TDP) to assist them in breaking into the Malaysian utility market by supporting their effort on their current proposals for SIPS-2more » project. It is recommended that TDP should approve a grant to TEN that would provide funds for engineering upto the preparation of equipment specifications and associated technology transfer. The grant along with the weak dollar should be attractive enough for TEN to strongly consider consortia with U.S. companies very favorably. The project also offers a potential for the export of U.S. manufactured equipment in the range of $170 million.« less

  9. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  10. Analysis of procurement processes and development of recommendations for intelligent transportation systems (ITS) procurements : final report.

    DOT National Transportation Integrated Search

    2007-09-01

    Traditional state procurement processes are not well-suited to the procurement of Intelligent Transportation Systems (ITS). The objective of this study was to analyze Kentuckys existing procurement processes, identify strengths and weaknesses of e...

  11. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  12. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  13. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  14. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  15. 23 CFR 172.5 - Methods of procurement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated... negotiation. Contracting agencies shall use competitive negotiation for the procurement of engineering and...

  16. 22 CFR 201.23 - Procurement under private sector procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement under private sector procedures... § 201.23 Procurement under private sector procedures. (a) General requirements. Procurements under private sector procedures will normally be carried out by importers using negotiated procurement...

  17. East Europe Report, Scientific Affairs, No. 776.

    DTIC Science & Technology

    1983-05-11

    Washington, D.C. 20402. Correspondence pertaining to matters other than procurement may be addressed to Joint Publications Research Service, 1000...the beginning of neutrons physics--the science of the properties of the neutron and its interactions-with the nucleus and matter . The science has...media, the magnetic properties of matter and phase transitions; in the physics of nuclear reactors and nuclear technology; in developing and applying

  18. Extending the Thin Blue Line: Constabulary Police Development in Phase Zero Operations

    DTIC Science & Technology

    2015-05-16

    procure intelligence and support from local nationals. This participatory community approach to policing promotes a lasting sense of security and safety...conflict by posturing the Germans to establish law and order and internal and border security.92 The participatory police partnership also resulted in...host nation police forces supported the expansion of democracy and promoted safe overseas economic transactions. Consequently, government officials

  19. Technical Advancements in Simulator-Based Weapons Team Training.

    DTIC Science & Technology

    1991-04-01

    Acting Head H.C. OKRASKI, Director Advanced Simulation Concepts Research and Engineering Division Department SPECIAL REPORT 91-003 GOVERNMENT RIGHTS...City. State, and ZWCode)I12350 Research Parkway Orlando-, FL 32826-3224 SS... NAME OF FUNDING / SPONSORING 8 b. OFFICE SYMBOL 9. PROCUREMENT INSTRUMENT...necessary and idmntify’ by block number) The research and development reported here represents one phase of a broader effort to improve the

  20. Quantitative Determination of Compound Classes in Jet Turbine Fuels by High Performance Liquid Chromatography/Differential Refractive Index Detection. Part 2.

    DTIC Science & Technology

    1984-12-31

    Code) Washington, DC 20375-5000 8a AEO UDN POSRN FIESMO 9. PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION (if aplicable ) Naa i ~ Proulion...pentane mobile phase was maintained at a flow rate of 6.0 ml/min with a Milton Roy Constametric pump operating in the 400-600 psi range. The injector was

  1. Waste Management Information System (WMIS) User Guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. E. Broz

    2008-12-22

    This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data throuh the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal.

  2. Interleaved arrays antenna technology development

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Phase one and two of a program to further develop and investigate advanced graphite epoxy waveguides, radiators, and components with application to space antennas are discussed. The objective of the two phases were to demonstrate mechanical integrity of a small panel of radiators and parts procured under a previous contract and to develop alternate designs and applications of the technology. Most of the emphasis was on the assembly and test of a 5 x 5 element module. This effort was supported by evaluation of adhesives and waveguide joint configurations. The evaluation and final assembly considered not only mechanical performance but also producibility in large scale.

  3. Summary data on all NASA procurement actions

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1992 (FY-92). The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during FY-92. However, these larger procurements accounted for only 28 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.

  4. 75 FR 13262 - Procurement List Additions and Deletions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ...: Additions to and deletions from the Procurement List. SUMMARY: This action adds to the Procurement List a... severe disabilities, and deletes from the Procurement List services previously furnished by such agencies... Severely Disabled published notices of proposed additions to the Procurement List. After consideration of...

  5. 75 FR 49481 - Procurement List; Additions and Deletion

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... added to the Procurement List: Services Service Type/Locations: Laundry Service, Atlanta VA Medical...: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities and deletes a service from the Procurement List previously furnished by such agency. DATES...

  6. Public perspectives on biospecimen procurement: what biorepositories should consider.

    PubMed

    L'Heureux, Jamie; Murray, Jeffrey C; Newbury, Elizabeth; Shinkunas, Laura; Simon, Christian M

    2013-06-01

    Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus "direct" procurement strategies such as the drawing of blood. Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens.

  7. 48 CFR 870.112 - Telecommunications equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Telecommunications... DEPARTMENT SUPPLEMENTARY REGULATIONS SPECIAL PROCUREMENT CONTROLS Controls 870.112 Telecommunications... specifications for telecommunications equipment, as defined in VA manual MP-6, Part VIII (available at any VA...

  8. 48 CFR 870.112 - Telecommunications equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Telecommunications... DEPARTMENT SUPPLEMENTARY REGULATIONS SPECIAL PROCUREMENT CONTROLS Controls 870.112 Telecommunications... specifications for telecommunications equipment, as defined in VA manual MP-6, Part VIII (available at any VA...

  9. 7 CFR 1486.303 - What specific contracting procedures must be adhered to?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... claims resulting from suits, challenges, or other disputes based on contracts entered into by the... description of the requirements for the services to be procured; (5) Perform some form of fee, price, or cost...

  10. 7 CFR 1486.303 - What specific contracting procedures must be adhered to?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... claims resulting from suits, challenges, or other disputes based on contracts entered into by the... description of the requirements for the services to be procured; (5) Perform some form of fee, price, or cost...

  11. 7 CFR 1486.303 - What specific contracting procedures must be adhered to?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... claims resulting from suits, challenges, or other disputes based on contracts entered into by the... description of the requirements for the services to be procured; (5) Perform some form of fee, price, or cost...

  12. 77 FR 11071 - Procurement List; Additions and Deletions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ...: Additions to and Deletions from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies... People Who Are Blind or Severely Disabled published notices of proposed additions to the Procurement List...

  13. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  14. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  15. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  16. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  17. 75 FR 4784 - Procurement List; Addition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... Procurement List. SUMMARY: This action adds to the Procurement List a service to be furnished by a nonprofit... Who Are Blind or Severely Disabled published a notice of proposed addition to the Procurement List... Committee has determined that the service listed below is suitable for procurement by the Federal Government...

  18. 14 CFR § 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NASA procurement program. § 1201.400... ORGANIZATION AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  19. 22 CFR 1006.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Are any procurement contracts included as... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1006.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  20. 21 CFR 1404.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  1. 21 CFR 1404.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  2. 34 CFR 85.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 85.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  3. LANGUAGE LABORATORY SPECIFICATIONS. A PROCUREMENT GUIDE FOR THE PURCHASE OF LANGUAGE LABORATORY INSTALLATIONS IN WISCONSIN, NDEA, TITLE III.

    ERIC Educational Resources Information Center

    GRITTNER, FRANK; PAVLAT, RUSSELL

    THE KNOWLEDGE ACCUMULATED FROM THE EXPERIENCE OF INSTALLING MANY LANGUAGE LABORATORIES UNDER THE TITLE III, NDEA PROGRAM FORMS THE BASIS FOR THE GUIDELINES PRESENTED IN THIS BULLETIN. THE DOCUMENT INCLUDES A SUMMARY OF CONDITIONS DESIRABLE PRIOR TO THE PURCHASE OF A LABORATORY, SAMPLE SPECIFICATIONS FOR EACH COMPONENT OF THE LAB, SPECIFICATIONS…

  4. Public Perspectives on Biospecimen Procurement: What Biorepositories Should Consider

    PubMed Central

    L'Heureux, Jamie; Murray, Jeffrey C.; Newbury, Elizabeth; Shinkunas, Laura

    2013-01-01

    Purpose Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus “direct” procurement strategies such as the drawing of blood. Methods Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. Results The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Conclusion Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens. PMID:24850089

  5. Ionospheric Monitoring and Specification Utilizing Data from the Defense Meteorological Satellite Program

    DTIC Science & Technology

    2010-12-01

    Government drawings, specifications, or other data included in this document for any purpose other than Government procurement does not in any way obligate...the U.S. Government . The fact that the Government formulated or supplied the drawings, specifications, or other data, does not license the holder...cannot be recovered. However, when these photo-currents are comparable to the ambient ion current, a degraded performance of the sensors results and

  6. Weld procedure produces quality welds for thick sections of Hastelloy-X

    NASA Technical Reports Server (NTRS)

    Flens, F. J.; Fletcher, C. W.; Glasier, L. F., Jr.

    1967-01-01

    Welding program produces premium quality, multipass welds in heavy tube sections of Hastelloy-X. It develops semiautomatic tungsten/inert gas procedures, weld wire procurement specifications material weld properties, welder-operator training, and nondestructive testing inspection techniques and procedures.

  7. Procurement procedures and specifications for performance measure capable traffic infrastructure data collection systems.

    DOT National Transportation Integrated Search

    2012-01-01

    Traffic signal systems represent a substantial component of the highway transportation network in the United : States. It is challenging for most agencies to find engineering resources to properly update signal policies and : timing plans to accommod...

  8. 42 CFR 495.348 - Procurement standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... specifications, requirements, statements of work, invitations for bids and requests for proposals must be... small businesses, minority-owned firms, and women's business enterprises, whenever possible. Grantees of..., minority-owned firms, and women's business enterprises are used to the fullest extent practicable. (ii...

  9. Report of the Task Force on Specifications and Standards

    DTIC Science & Technology

    1977-04-01

    pro- cedures covering interim changes or corrections to specifications and standar (ls required to effect a procurement . A language change was proposed...DEFENSE SCIENCE BOARD SREPORT OF THE TASK FORCE ON 0 ’SPECIFICATIONS AND STANDARDS APRIL 1977 I S-J APPROVED FOR PUBLIC RELEASE; DISTRIBUTION...FORCE ON SPECIFICATIONS aSTANDARDS :::nm,1UTION STA T,~~ i vl for public Weeae; .-Aibution Ulnlimited Office of, 11h1 I irel-4,r. I )eh- iss R se rc

  10. Roles of sex and ethnicity in procurement coordinator--family communication during the organ donation discussion.

    PubMed

    Baughn, Daniel; Auerbach, Stephen M; Siminoff, Laura A

    2010-09-01

    Interpersonal relations with health care providers influence families' decisions to consent to solid-organ donation. However, previous research has been based on retrospective interviews with donation-eligible families and has not directly examined the interpersonal interactions between families and organ procurement coordinators. To increase understanding of the interpersonal interaction between procurement coordinators and families during the organ donation discussion, with special attention to the influence of the sex and race of the procurement coordinator and the race of the potential donor's family. A descriptive study in which standardized patients portrayed family members interacting with actual procurement coordinators in simulated donation request scenarios. Thirty-three videotaped interactions between standardized patients and 17 procurement coordinators involving 2 different scenarios depicting deceased donation were evaluated. Video recordings were rated by independent coders. Coders completed the Impact Message Inventory-Form C, the Participatory Style of Physician Scale, and the Siminoff Communication and Content and Affect Program-Global Observer Ratings scale. African American procurement coordinators, particularly African American women, were rated as more controlling and work-oriented than white procurement coordinators. Male procurement coordinators were more affiliative with the white family than the African American family, whereas female procurement coordinators were slightly less affiliative with the white family. African American procurement coordinators expressed more positive affect when interacting with the African American family than the white family, whereas the opposite was true for white procurement coordinators. Research is needed to cross-validate these exploratory findings and further examine cultural mistrust between procurement coordinators and families of ethnic minorities, especially given the negative attitudes of many minorities toward donation.

  11. Acquisition-Management Program

    NASA Technical Reports Server (NTRS)

    Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.

    1987-01-01

    NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.

  12. A cross-sectional survey of the models in Bihar and Tamil Nadu, India for pooled procurement of medicines.

    PubMed

    Chokshi, Maulik; Farooqui, Habib Hasan; Selvaraj, Sakthivel; Kumar, Preeti

    2015-01-01

    In India, access to medicine in the public sector is significantly affected by the efficiency of the drug procurement system and allied processes and policies. This study was conducted in two socioeconomically different states: Bihar and Tamil Nadu. Both have a pooled procurement system for drugs but follow different models. In Bihar, the volumes of medicines required are pooled at the state level and rate contracted (an open tender process invites bidders to quote for the lowest rate for the list of medicines), while actual invoicing and payment are done at district level. In Tamil Nadu, medicine quantities are also pooled at state level but payments are also processed at state level upon receipt of laboratory quality-assurance reports on the medicines. In this cross-sectional survey, a range of financial and non-financial data related to procurement and distribution of medicine, such as budget documents, annual reports, tender documents, details of orders issued, passbook details and policy and guidelines for procurement were analysed. In addition, a so-called ABC analysis of the procurement data was done to to identify high-value medicines. It was observed that Tamil Nadu had suppliers for 100% of the drugs on their procurement list at the end of the procurement processes in 2006, 2007 and 2008, whereas Bihar's procurement agency was only able to get suppliers for 56%, 59% and 38% of drugs during the same period. Further, it was observed that Bihar's system was fuelling irrational procurement; for example, fluconazole (antifungal) alone was consuming 23.4% of the state's drug budget and was being procured by around 34% of the districts during 2008-2009. Also, the ratios of procurement prices for Bihar compared with Tamil Nadu were in the range of 1.01 to 22.50. For 50% of the analysed drugs, the price ratio was more than 2, that is, Bihar's procurement system was procuring the same medicines at more than twice the prices paid by Tamil Nadu. Centralized, automated pooled procurement models like that of Tamil Nadu are key to achieving the best procurement prices and highest possible access to medicines.

  13. 41 CFR 101-26.505-3 - Requests to procure similar items from sources other than GSA supply sources.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requests to procure... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26...

  14. Monolithic GaAs dual-gate FET phase shifter

    NASA Astrophysics Data System (ADS)

    Kumar, M.; Subbarao, S. N.; Menna, R.

    1981-09-01

    The objective of this program is to develop a monolithic GaAs dual-gate FET phase shifter, operating over the 4- to 8-GHz frequency band and capable of a continuously programmable phase shift from 0 deg through N times 360 deg where N is an integer. The phase shift is to be controllable to within +3 deg. This phase shifter will be capable of delivering an output power up to 0 dBm with an input and output VSWR of less than 1.5:1. Progress 1: The photomask of a 0 to 90 deg monolithic GaAs dual-gate FET phase shifter has been procured, and we are in the process of fabricating the phase shifter. 2: We have designed and fabricated a 50 ohm, 4-line interdigitated coupler. Also, we have designed and fabricated a 25-ohm, 6-line interdigitated coupler. The performance of both couplers agrees quite well with the theoretical results. Technical Problems: there was no major problem during this period.

  15. Joint Land Attack Cruise Missile Defense Elevated Netted Sensor System Not Ready for Production Decision (REDACTED)

    DTIC Science & Technology

    2012-09-07

    Average Procurement Unit Cost CMDS Cruise Missile Defense Systems CPD Capability Production Document EMD Engineering and Manufacturing...Defense for Acquisition, Technology and Logistics also determined that continuing test and evaluation of the two JLENS Engineering and Manufacturing...Program (Category ID) that was established in January 1996 and, during the audit, was in the Engineering and Manufacturing Development (EMD) phase of

  16. The Air Force Aviation Investment Challenge

    DTIC Science & Technology

    2015-12-11

    Report R42136, U.S. Unmanned Aerial Systems. 6 Procurement percentage excludes modification funding. 7 IOC from Department of Defense, Annual Aviation...different picture. Spending for the LRS-B, following its recent contract award and entering its engineering and manufacturing development phase, is...Budget As part of its markup of the Navy’s proposed FY2015 budget, Congress created the National Sea- Based Deterrence Fund (NSBDF), a fund in the DOD

  17. The Air Force Aviation Investment Challenge

    DTIC Science & Technology

    2015-12-17

    7 Procurement percentage excludes modification funding. 8 IOC from Department of Defense, Annual Aviation Inventory and Funding Plan, Fiscal Years...its engineering and manufacturing development phase, is projected to triple over the course of the FYDP. 9 The newer programs begin with relatively...Through a Non-Air Force Budget As part of its markup of the Navy’s proposed FY2015 budget, Congress created the National Sea- Based Deterrence Fund

  18. Donor and procurement related issues in vascularized composite allograft transplantation.

    PubMed

    McDiarmid, Sue V

    2013-12-01

    To understand the unique requirements of vascularized composite allograft (VCA) donation and procurement practices and the integral role of the established nationwide organ procurement organizations in organ procurement. The recent issuance of a Final Rule (July 2013) by the United States Secretary of Health that redefines VCAs as organs rather than tissues, opens up the potential to formalize policies and procedures, under the auspices of the Organ Procurement and Transplantation Network, that can improve VCA donation, procurement practices, develop allocation algorithms and provide transparent oversight. Improved VCA donation rates, procurement procedures and broader sharing nationwide of VCA donors will have important implications in advancing the emerging field of VCA transplantation.

  19. 49 CFR 19.44 - Procurement procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... specific features of “brand name or equal” descriptions that bidders are required to meet when such items... to utilize small businesses, minority-owned firms, and women's business enterprises, whenever...) Ensure that small businesses, minority-owned firms, and women's business enterprises are used to the...

  20. 10 CFR 470.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Energy Procurement Regulations (41 CFR part 9). Indian tribe means any tribe band, nation, or other... government including specifically a county, municipality, city, town, township, local public authority... no part of the net earnings of which insure to the benefit of any private shareholder or individual...

  1. 7 CFR 1755.27 - Borrower contractual obligations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS, AND STANDARD CONTRACT FORMS § 1755.27 Borrower contractual obligations. (a) Loan agreement. As a condition of a loan or... pursuant to which the borrowers agree to use RUS standard contract forms for construction, procurement...

  2. Knowledge management in healthcare: towards 'knowledge-driven' decision-support services.

    PubMed

    Abidi, S S

    2001-09-01

    In this paper, we highlight the involvement of Knowledge Management in a healthcare enterprise. We argue that the 'knowledge quotient' of a healthcare enterprise can be enhanced by procuring diverse facets of knowledge from the seemingly placid healthcare data repositories, and subsequently operationalising the procured knowledge to derive a suite of Strategic Healthcare Decision-Support Services that can impact strategic decision-making, planning and management of the healthcare enterprise. In this paper, we firstly present a reference Knowledge Management environment-a Healthcare Enterprise Memory-with the functionality to acquire, share and operationalise the various modalities of healthcare knowledge. Next, we present the functional and architectural specification of a Strategic Healthcare Decision-Support Services Info-structure, which effectuates a synergy between knowledge procurement (vis-à-vis Data Mining) and knowledge operationalisation (vis-à-vis Knowledge Management) techniques to generate a suite of strategic knowledge-driven decision-support services. In conclusion, we argue that the proposed Healthcare Enterprise Memory is an attempt to rethink the possible sources of leverage to improve healthcare delivery, hereby providing a valuable strategic planning and management resource to healthcare policy makers.

  3. Food commodity pipeline management in transitional settings: challenges and lessons learned from the first USAID food development program in South Sudan

    PubMed Central

    Tappis, Hannah; Doocy, Shannon; Amoako, Stephen

    2013-01-01

    ABSTRACT Despite decades of support for international food assistance programs by the U.S. Agency for International Development (USAID) Office of Food for Peace, relatively little is known about the commodity pipeline and management issues these programs face in post-conflict and politically volatile settings. Based on an audit of the program's commodity tracking system and interviews with 13 key program staff, this case study documents the experiences of organizations implementing the first USAID-funded non-emergency (development) food assistance program approved for Sudan and South Sudan. Key challenges and lessons learned in this experience about food commodity procurement, transport, and management may help improve the design and implementation of future development food assistance programs in a variety of complex, food-insecure settings around the world. Specifically, expanding shipping routes in complex political situations may facilitate reliable and timely commodity delivery. In addition, greater flexibility to procure commodities locally, rather than shipping U.S.-procured commodities, may avoid unnecessary shipping delays and reduce costs. PMID:25276532

  4. Application of Kanban System on a hospital pharmacy.

    PubMed

    Mitka, Eleftheria

    2015-01-01

    This is a brief overview of principles, views and methods, of the Kanban System for the pharmacy of a general hospital. The main goal is the reduction of stores managed by the pharmacy, as well as improvement of the mode of operation. Solutions to problems, such as inadequate storage space, the delay in serving patients or clinics and the expiration of various pharmaceutical formulations, stored for so long time, are provided. The philosophy behind the Kanban procurement System and specifically its applicability to a pharmacy underperforming in terms of efficiency, in Greece, are described. Based on the analysis of stock requirement, item stock prices and demand, it is concluded that a significant percentage of the stocked drugs can be procured using the Kanban System. Significant cost savings and operational advantages following the Kanban System will take place. The challenging endeavor is the analysis, design and application of a system that supports the proposed procurement method. Hospital pharmacies in Greece and in other countries that face an economic crisis may largely benefit after using the Kanban System.

  5. Tissue procurement system in Japan: the role of a tissue bank in medical center for translational research, Osaka University Hospital.

    PubMed

    Ohkawara, H; Fukushima, N; Kitagawa, T; Ito, T; Masutani, Y; Sawa, Y

    2010-01-01

    Although organ procurement has been regulated by The Organ Transplantation Law (brain-dead donors since 1997, donors after cardiac death since 1979), there has been no law or governmental procurement network (except for cornea) in Japan. Since the late 1980s, some university hospitals have developed original banks. Finally, in 2001 guidelines for tissue procurement were established by The Japanese Society of Tissue Transplantation and Japan Tissue Transplant Network (JTTN) to coordinate tissue harvesting. Five tissue banks were joined to the tissue transplant network (skin in one, heart valves in two, and bone in two). As the number of tissue banks is small, each bank cooperates on procurement, but cannot cover the entire country. With regard to skin transplantation, only one skin bank-The Japan Skin Bank Network (JSBN), which is located in Tokyo-has organized skin procurement. Therefore, it has been difficult to procure skin in areas distant from Tokyo, especially around Osaka. In order to improve such a situation, a tissue bank collaborating with the JSBN was established at The Medical Center for Translational Research (MTR), Osaka University Hospital in April 2008. The bank has played a role in skin procurement center in western Japan and supported procurement and preservation at the time of the skin procurement. Between April 2008 and September 2009, the bank participated in eight tissue procurements in the western area. In the future, the bank is planning to procure and preserve pancreatic islets and bones. Moreover, there is a plan to set up an induced pluripotent stem cells center and stem cell bank in MTR. This tissue bank may play a role to increase tissue procurement in Japan, especially in the western area. .

  6. A Comparative Study of the Perceived Usefulness of Civilian Institution Contracting-Related Graduate Programs by Graduates and the Perceived Usefulness of the AFIT CAM (Air Force Institute of Technology Contracting and Manufacturing) Program by Graduates

    DTIC Science & Technology

    1985-09-01

    courses for a concentration in procurement and materials management: Procurement and Materials Management Procurement Contract Law Systems Procurement...for contracting in the public sector (Procurement Contract Law ). The respondents did not agree as much with this question as they did with the...the results of this section proved quite different from the group as a whole. Contract Law , Contract Negotiations, Pricing, Procurement Management

  7. Are farm-to-school programs more common in states with farm-to-school-related laws?

    PubMed

    Schneider, Linda; Chriqui, Jamie; Nicholson, Lisa; Turner, Lindsey; Gourdet, Camille; Chaloupka, Frank

    2012-05-01

    Farm-to-School programs (FTSPs) connect schools with locally grown food. This article examines whether FTSPs are more common in public elementary schools (ESs) in states with a formal, FTSP law or with a related, locally grown procurement law. A pooled, cross-sectional analysis linked nationally representative samples of 1872 public ESs (across 47 states) for the 2006-2007, 2007-2008, and 2008-2009 school years with state laws effective as of the beginning of September of each year that were collected and analyzed for all states. Multivariate logistic regression models examined the impact of state law on school FTSP participation, controlling for year and school-level race/ethnicity, region, locale, free-reduced lunch participation, and school size. The percentage of schools located in a state with a FTSP-specific law increased from 7.3% to 20.4% over the 3-year period, while the percentage of schools located in a state with a locally grown procurement law was approximately 30% across all years. The percentage of schools with FTSPs has more than tripled over the last 3 years (from 4.9% to 17.7%). After adjusting for all covariates except year, FTSPs were significantly more likely in states with a FTSP-specific law (OR = 2.45, 95% CI = 1.28-4.67); once adjusting for year, the results were marginally significant (OR = 1.72, 95% CI = .91-3.25). School-level FTSPs were not related to state locally grown procurement laws. Although the percentage of schools with FTSPs is relatively small, these programs are becoming more common, particularly in states with FTSP-specific laws. © 2012, American School Health Association.

  8. Jumbo Space Environment Simulation and Spacecraft Charging Chamber Characterization

    DTIC Science & Technology

    2015-04-09

    PAGE Using Government drawings, specifications, or other data included in this document for any purpose other than Government procurement does not...in any way obligate the U.S. Government. The fact that the Government formulated or supplied the drawings, specifications, or other data does not...including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing

  9. Does Pharmaceutical Pricing Transparency Matter? Examining Brazil's Public Procurement System.

    PubMed

    Kohler, Jillian Clare; Mitsakakis, Nicholas; Saadat, Faridah; Byng, Danalyn; Martinez, Martha Gabriela

    2015-08-04

    We review procurement and pricing transparency practices for pharmaceutical products. We specifically focus on Brazil and examine its approach to increasing pricing transparency, with the aim of determining the level of effectiveness in lower prices using a tool (Banco de Preços em Saúde, BPS) that only reveals purchase prices as compared to other tools (in other countries) that establish a greater degree of price transparency. A general report of Preços em Saúde (BPS) and Sistema Integrado de Administração de Serviços Gerais (SIASG) pricing data was created for 25 drugs that met specific criteria. To explore the linear time trend of each of the drugs, separate regression models were fitted for each drug, resulting in a total of 19 models. Each model controlled for the state variable and the interaction between state and time, in order to accommodate expected heterogeneity in the data. Additionally, the models controlled for procurement quantities and the effect they have on the unit price. Secondary analysis using mixed effects models was also carried out to account for the impact that institutions and suppliers may have upon the unit price. Adjusting for these predictor variables (procurement quantities, supplier, purchasing institution) was important to determine the sole effect that time has had on unit prices. A total of 2 x 19 = 38 models were estimated to explore the overall effect of time on changes in unit price. All statistical analyses were performed using the R statistical software, while the linear mixed effects models were fitted using the lme4 R package. The findings from our analysis suggest that there is no pattern of consistent price decreases within the two Brazilian states during the five-year period for which the prices were analyzed. While the BPS does allow for an increase in transparency and information on drug purchase prices in Brazil, it has not shown to lead to consistent reductions in drug purchase prices for some of the most widely used medicines. This is indicative of a limited model for addressing the challenges in pharmaceutical procurement and puts into question the value of tools used globally to improve transparency in pharmaceutical pricing.

  10. Analysis of potential factors affecting microbiological cultures in tissue donors during procurement.

    PubMed

    Lannau, B; Van Geyt, C; Van Maele, G; Beele, H

    2015-03-01

    During the procurement of musculoskeletal grafts contamination may occur. As this might be detrimental for the acceptor, it is important to know which variables influence this occurrence and to alter procurement protocols accordingly. From 2004 to 2012 we gathered information on 6,428 allografts obtained from 291 donors. Using a multiple regression model we attempted to determine the factors that influence the contamination risk during procurement. We used the following variables: cause of death, type of hospital (i.e. university hospital vs. general hospital), previous blood vessel donation, previous organ donation, donor age, time between death and the start of the procurement, duration of the procurement, number of people attending the procurement and the number of procured grafts. The multiple regression model was only able to explain 5 % of the variability of the used outcome variable. None of the variables examined appear to have an important influence on the contamination risk.

  11. Tissue procurement and transplantation: a Tuscany perspective.

    PubMed

    Filipponi, F; De Simone, P; Saviozzi, A; Bozzi, G

    2008-01-01

    Tissue procurement and transplantation are rarely taken into account as indicators of the efficiency of a regional donor procurement network. We present herein a retrospective review on Tuscany tissue procurement activities from 2004 until 2006. In 2003 the Tuscan Regional Government appointed a transplantation service authority to reorganize all regional donation and transplantation activities: the Organizzazione Toscana Trapianti (OTT). The regional tissue procurement network was based on either brain death (BD) and cardiac death (CD) donors under the responsibility of in-hospital transplantation coordinators (IHTCs). From 2004 to 2006, a total of 397 tissue donors were procured in Tuscany, and 4151 tissue transplantations were performed: 2909 skin grafts, 1209 bone grafts, and 33 heart valves. Over the same period, a total of 2116 cornea donors were procured; 4117 corneas were retrieved; 1779 were fit for transplantation, and 1418 were transplanted. Based on our experience, implementation of tissue procurement requires use of BD donors and paramount organizational efforts from IHTCs.

  12. Treatment 2.0: catalyzing the next phase of treatment, care and support.

    PubMed

    Duncombe, Chris; Ball, Andrew; Passarelli, Carlos; Hirnschall, Gottfried

    2013-01-01

    This review provides an update on the WHO/UNAIDS Treatment 2.0 strategy by reviewing the documents and technical updates issued under the initiative. Launched in 2010, this global initiative provides a framework for the continued scale-up of access to HIV care and treatment. WHO has prioritized once daily fixed-dose combination as the preferred antiretroviral (ARV) regimen to initiate HIV treatment, paving the way for programmatic simplification, with reduced toxicity and improved adherence. WHO also recommends the use of point-of-care diagnostics, with CD4 cell count technologies being implemented in the field and progress towards improving access to simplified viral load testing. The strategy also seeks mechanisms that can contribute to reducing treatment costs, such as pooled commodity procurement and public health-oriented licensing approaches. Improved service delivery, specifically through decentralization, task shifting, integration and community mobilization also has the potential to reduce costs and improve access. Support to countries has been provided through the timely release of a series of programmatic and technical updates on specific treatment-related topics. The Treatment 2.0 strategy articulates how innovation and greater efficiency can make HIV care and treatment more accessible and affordable, and guide treatment and prevention scale-up.

  13. Procurement | NREL

    Science.gov Websites

    Procurement Procurement The National Renewable Energy Laboratory (NREL) offers numerous procurement source of biofuels. Register Your Small Business NREL welcomes small, disadvantaged, HUBzone, veteran -owned, and women-owned business vendors and subcontractors. Register today

  14. Quantifying the benefits of the Florida Transit Research Inspection Procurement Services (TRIPS) program : [research summary].

    DOT National Transportation Integrated Search

    2013-04-01

    Established in 1995 as the Florida Vehicle : Procurement Program (FVPP), Florida Transit : Research Inspection Procurement Services (TRIPS) : is a vehicle sourcing and procurement system for : Floridas public transit agencies that integrates : ins...

  15. Applying e-procurement system in the healthcare: the EPOS paradigm

    NASA Astrophysics Data System (ADS)

    Ketikidis, Panayiotis H.; Kontogeorgis, Apostolos; Stalidis, George; Kaggelides, Kostis

    2010-03-01

    One of the goals of procurement is to establish a competitive price, while e-procurement utilises electronic commerce to identify potential sources of supply, to purchase goods and services, to exchange contractual information and to interact with suppliers. Extensive academic work has been extensively devoted to e-procurement in diverse industries. However, applying e-procurement in the healthcare sector remains unexplored. It lacks an efficient e-procurement mechanism that will enable hospitals and healthcare suppliers to electronically exchange contractual information, aided by the technologies of optimisation and business rules. The development and deployment of e-procurement requires a major effort in the coordination of complex interorganisational business process. This article presents an e-procurement optimised system (EPOS) for the healthcare marketplace, a complete methodological approach for deploying and operating such system, as piloted in public and private hospitals in three European countries (Greece, Spain and Belgium) and suppliers of healthcare items in the fourth country (Italy). The efficient e-procurement mechanism that EPOS suggests enables hospitals and pharmaceutical and medical equipment suppliers to electronically exchange contractual information.

  16. A Planning Framework for the Deployment of Innovative Information and Communication Technologies in Procurement

    NASA Astrophysics Data System (ADS)

    Alard, Robert; Gustafsson, Martin; Nienhaus, Jörg

    The management of buyer-supplier relations is a major topic for many enterprises today. Modern Information and Communication Technologies (ICT) offer interesting perspectives on opportunities and implementation approaches. Today, logistics and procurement departments of numerous enterprises are evaluating the possibilities and opportunities of new ICT solutions and especially of internet-based electronic procurement solutions for the optimisation and re-engineering of their buyer-supplier relationships. Due to the highly innovative character of the new ICT solutions and the scarcely available operational examples in the industry, only little guidance exists to support responsible managers during the evaluation, planning and designing of internet-based electronic procurement solutions. This paper describes a framework for the strategic evaluation and planning of the deployment of internet-based procurement solutions for direct materials. The presented approach supports enterprises in the analysis of procurement objects and procurement structuring, in the definition and management of buyer-supplier-relationships, in the requirements analysis of ICT solutions as well as the assessment of the potential to support procurement with innovative ICT and internet-based electronic procurement solutions.

  17. 34 CFR 74.44 - Procurement procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... standards. (iv) The specific features of brand name or equal descriptions that bidders are required to meet... made by recipients to utilize small businesses, minority-owned firms, and women's business enterprises...: (1) Ensure that small businesses, minority-owned firms, and women's business enterprises are used to...

  18. 78 FR 4133 - Procurement List; Proposed Additions and Deletion

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ... specific tasks including preparation of menu boards, table bussing service, guest flow rate, service of food, replenishing of food, unloading, storing, and shelving of supplies, food preparation, cashier... the event of contingency, perform all required tasks to include cooking to ensure continued service...

  19. Goddard Space Flight Center specification for Helical-Scan 8-millimeter (mm) magnetic digital data tape cartridge

    NASA Technical Reports Server (NTRS)

    Perry, Jimmy L.

    1992-01-01

    The same kind of standard and controls are established that are currently in use for the procurement of new analog, digital, and IBM/IBM compatible 3480 tape cartridges, and 1 in wide channel video magnetic tapes. The Magnetic Tape Certification Facility (MTCF) maintains a Qualified Products List (QPL) for the procurement of new magnetic media and uses the following specifications for the QPL and Acceptance Tests: (1) NASA TM-79724 is used for the QPL and Acceptance Testing of new analog magnetic tapes; (2) NASA TM-80599 is used for the QPL and Acceptance Testing of new digital magnetic tapes; (3) NASA TM-100702 is used for the QPL and Acceptance Testing of new IBM/IBM compatible 3840 magnetic tape cartridges; and (4) NASA TM-100712 is used for the QPL and Acceptance Testing of new 1 in wide channel video magnetic tapes. This document will be used for the QPL and Acceptance Testing of new Helical Scan 8 mm digital data tape cartridges.

  20. 24 CFR 963.12 - Alternative procurement process.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT PUBLIC HOUSING-CONTRACTING WITH RESIDENT-OWNED BUSINESSES Contracting With Resident-Owned Businesses § 963.12 Alternative procurement process. (a) Method of procurement. In contracting with resident-owned businesses, the PHA shall follow the applicable method of procurement as set forth...

  1. Handling the procurement of prostheses for total hip replacement: description of an original value based approach and application to a real-life dataset reported in the UK

    PubMed Central

    Messori, Andrea; Trippoli, Sabrina; Marinai, Claudio

    2017-01-01

    Objectives In most European countries, innovative medical devices are not managed according to cost–utility methods, the reason being that national agencies do not generally evaluate these products. The objective of our study was to investigate the cost-utility profile of prostheses for hip replacement and to calculate a value-based score to be used in the process of procurement and tendering for these devices. Methods The first phase of our study was aimed at retrieving the studies reporting the values of QALYs, direct cost, and net monetary benefit (NMB) from patients undergoing total hip arthroplasty (THA) with different brands of hip prosthesis. The second phase was aimed at calculating, on the basis of the results of cost–utility analysis, a tender score for each device (defined according to standard tendering equations and adapted to a 0–100 scale). This allowed us to determine the ranking of each device in the simulated tender. Results We identified a single study as the source of information for our analysis. Nine device brands (cemented, cementless, or hybrid) were evaluated. The cemented prosthesis Exeter V40/Elite Plus Ogee, the cementless device Taperloc/Exceed, and the hybrid device Exeter V40/Trident had the highest NMB (£152 877, £156 356, and £156 210, respectively) and the best value-based tender score. Conclusions The incorporation of value-based criteria in the procurement process can contribute to optimising the value for money for THA devices. According to the approach described herein, the acquisition of these devices does not necessarily converge on the product with the lowest cost; in fact, more costly devices should be preferred when their increased cost is offset by the monetary value of the increased clinical benefit. PMID:29259062

  2. Supplement Analysis for the Watershed Management Program Final EIS (DOE EIS /SA-156) - Upper Salmon River Anadromous Fish Passage Improvement Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keller, Carl J.

    2004-07-13

    BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less

  3. Cryogenic fluid management experiment

    NASA Technical Reports Server (NTRS)

    Eberhardt, R. N.; Bailey, W. J.; Fester, D. A.

    1981-01-01

    The cryogenic fluid management experiment (CFME), designed to characterize subcritical liquid hydrogen storage and expulsion in the low-q space environment, is discussed. The experiment utilizes a fine mesh screen fluid management device to accomplish gas-free liquid expulsion and a thermodynamic vent system to intercept heat leak and control tank pressure. The experiment design evolved from a single flight prototype to provision for a multimission (up to 7) capability. A detailed design of the CFME, a dynamic test article, and dedicated ground support equipment were generated. All materials and parts were identified, and components were selected and specifications prepared. Long lead titanium pressurant spheres and the flight tape recorder and ground reproduce unit were procured. Experiment integration with the shuttle orbiter, Spacelab, and KSC ground operations was coordinated with the appropriate NASA centers, and experiment interfaces were defined. Phase 1 ground and flight safety reviews were conducted. Costs were estimated for fabrication and assembly of the CFME, which will become the storage and supply tank for a cryogenic fluid management facility to investigate fluid management in space.

  4. SEVIRI, the imaging radiometer on Meteosat second generation: in-orbit results and first assessment

    NASA Astrophysics Data System (ADS)

    Coste, P.; Pasternak, F.; Faure, F.; Jacquet, B.; Bianchi, S.; Aminou, Donny M. A.; Luhmann, H. J.; Hanson, C.; Pili, P.; Fowler, G.

    2017-11-01

    Meteosat Second Generation (MSG) is a series of 3 geo-stationary satellites developed and procured by the European Space Agency (ESA) on behalf of the European Organisation for the Exploitation of Meteorological Satellites (EUMETSAT). The first satellite (MSG-1) was launched on August 29, 2002 by an Ariane 5 rocket. SEVIRI is the main MSG payload and produces 12 channels imaging in visible and IR range. The 8 Infrared Channels in the 3.9-13.4 mm band benefit from high radiometric performances thanks to the use of detectors operating at 95K and cooled by specifically designed passive radiator. During the commissioning phase, dedicated tests have been conducted to verify the SEVIRI functionality and performances. This paper presents briefly the SEVIRI design and highlights the correlation of data obtained in-flight by EUMETSAT with the ground predictions. A particular emphasis is put on the in-orbit evolution of the IR channel gains and on the instrument decontamination.

  5. Endoscopic versus transcranial procurement of allograft tympano-ossicular systems: a prospective double-blind randomized controlled audit.

    PubMed

    Caremans, Jeroen; Hamans, Evert; Muylle, Ludo; Van de Heyning, Paul; Van Rompaey, Vincent

    2016-06-01

    Allograft tympano-ossicular systems (ATOS) have proven their use over many decades in tympanoplasty and reconstruction after resection of cholesteatoma. The transcranial bone plug technique has been used in the past 50 years to procure en bloc ATOS (tympanic membrane with malleus, incus and stapes attached). Recently, our group reported the feasibility of the endoscopic procurement technique. The aim of this study was to assess whether clinical outcome is equivalent in ATOS acquired by using the endoscopic procurement technique compared to ATOS acquired by using the transcranial technique. A double-blind randomized controlled audit was performed in a tertiary referral center in patients that underwent allograft tympanoplasty because of chronic otitis media with and without cholesteatoma. Allograft epithelialisation was evaluated at the short-term postoperative visit by microscopic examination. Failures were reported if reperforation was observed. Fifty patients underwent allograft tympanoplasty: 34 received endoscopically procured ATOS and 16 received transcranially procured ATOS. One failed case was observed, in the endoscopic procurement group. We did not observe a statistically significant difference between the two groups in failure rate. This study demonstrates equivalence of the clinical outcome of allograft tympanoplasty using either endoscopic or transcranial procured ATOS and therefore indicates that the endoscopic technique can be considered the new standard procurement technique. Especially because the endoscopic procurement technique has several advantages compared to the former transcranial procurement technique: it avoids risk of prion transmission and it is faster while lacking any noticeable incision.

  6. Space shuttle main engine controller assembly, phase C-D. [with lagging system design and analysis

    NASA Technical Reports Server (NTRS)

    1973-01-01

    System design and system analysis and simulation are slightly behind schedule, while design verification testing has improved. Input/output circuit design has improved, but digital computer unit (DCU) and mechanical design continue to lag. Part procurement was impacted by delays in printed circuit board, assembly drawing releases. These are the result of problems in generating suitable printed circuit artwork for the very complex and high density multilayer boards.

  7. Avionics Integrity Program (AVIP). Volume 1. Procurement Phase Issues - Design, Manufacturing, and Integration

    DTIC Science & Technology

    1984-03-01

    Engineering initiative to develop an orderly plan and procedure to assure that USAF acquire reliable, high quality, supportable avionics with a higher avail...susceptibility te~t~ (radiated and conducted), and emission of radio frequency energy tests."l6) Other electrical stresses can include over/under voltage...jo ints, poor welds, and dielectric defects. Also, instruments with components unable to endu very high temperatures can be safely tested. 1-19

  8. Study Techniques for Controlling Flavor Intensity in Compressed Foods (Phase 2)

    DTIC Science & Technology

    1976-06-10

    and gravies were prepared as cooked materials, freeze- dried and chopped . The mushroom soup ingredients were all used as procured in their dry...This material, after blending with the soup base, was free£e= dried and chopped prior to blending with the re- maining components in preparation of...Exec- utive Chef, using the following formula: TABLE XII Onion Gravy Formula Ingredients % Onions, Chopped Tomato Paste Hard Wheat Flour Beef

  9. Teal Ruby Experiment. Phase I Definition Study. Volume I. Part 2. Appendixes

    DTIC Science & Technology

    1977-05-01

    degree, Engineering Mechanics, Stanford University; M.S., Physics, New Mexico State University; B.A., Mathematics, Uaiversity of California atLos...Receiving Inspection Supervisor, military aircraft parts and materials * M.B.A., Mexico City College; Industrial Engineering, General Motors Institute A...S$Act ..MCA!y. f A SuiSn.•..v Of t¢OCtNI1 AI*CIATf COIOV*A,*ON LMSC-5699533 RICHARD- C. SEXT -ON -. Material Procurement Responsibilities

  10. NATO Phase Zero Contracting - A Proposed Strategic and Operational Planning Construct Within the NATO Framework for Defense Planning and Standardization

    DTIC Science & Technology

    2015-02-12

    become better stewards of scarce resources, to eliminate potential waste, and to reduce abuse of taxpayer money due to poor management, operational...stewards of scarce resources, to eliminate potential waste, and to reduce abuse of taxpayer money due to poor management, operational redundancy and...Conference—Best Practices and Lessons Learned and Training and Educating for Acquisition, Procurement and Contracting in Defense Institutions

  11. Operation HARDTACK. Phase 2

    DTIC Science & Technology

    1959-07-01

    Nevada Test Site. ditions, available equipment and material , and late criteria changes requesifd by the partici- "The Nevada tests will e held during...by visory personnel. H&N Field Engineers or the H&N Material TestsResident Engineer. The majority of material tests consisted of 3. Reports and...procurement of material and hol, date of request, date rquired, work to be equipment to be used in the test facilities pro- performed, and site or station

  12. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  13. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 12 2013-01-01 2013-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  14. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 12 2014-01-01 2013-01-01 true Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  15. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  16. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  17. 22 CFR 226.46 - Procurement records.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement records. 226.46 Section 226.46 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.46 Procurement records...

  18. 76 FR 12016 - Local and Regional Food Aid Procurement Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... DEPARTMENT OF AGRICULTURE Foreign Agricultural Service Local and Regional Food Aid Procurement... field-based projects under the USDA Local and Regional Food Aid Procurement Pilot Project (USDA LRP..., 2011. FOR FURTHER INFORMATION CONTACT: Jamie Fisher, Chief, Local and Regional Procurement, Food...

  19. 48 CFR 2401.601-70 - Senior Procurement Executive.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Senior Procurement... Authority, and Responsibilities 2401.601-70 Senior Procurement Executive. Unless otherwise designated by the Secretary through a delegation of authority, the Chief Procurement Officer is the Department's Senior...

  20. 78 FR 20783 - Designation of Product Categories for Federal Procurement; Withdrawal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-08

    ... Designation of Product Categories for Federal Procurement; Withdrawal AGENCY: Office of Procurement and.... Department of Agriculture (USDA) is withdrawing the final rule ``Designation of Product Categories for... product categories within which biobased products will be afforded Federal procurement preference, was...

  1. 32 CFR 203.13 - Procurement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Procurement. 203.13 Section 203.13 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS... small businesses, and will be conducted as competitive procurements. Procurements below a value of $2...

  2. 48 CFR 702.170-13 - Procurement Executive.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Procurement Executive. 702.170-13 Section 702.170-13 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL DEFINITIONS OF WORDS AND TERMS Definitions 702.170-13 Procurement Executive. “Procurement...

  3. 10 CFR 436.43 - Procurement planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Procurement planning. 436.43 Section 436.43 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Agency Procurement of Energy Efficient Products § 436.43 Procurement planning. (a) Agencies should consider the...

  4. 23 CFR 172.5 - Methods of procurement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... proposal solicitation (project, task, or service) process shall be by public announcement, advertisement... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated...

  5. 32 CFR 516.58 - Policies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... LITIGATION Remedies in Procurement Fraud and Corruption § 516.58 Policies. (a) Procurement fraud and... administrative remedies in significant cases of fraud or corruption relating to Army procurement. (d) The key... of fraud or corruption involving procurement. (g) Coordination on the status and disposition of cases...

  6. Ethics and regulation in organ procurement research.

    PubMed

    Ackerman, Terrence F; Winsett, Rebecca P

    2002-12-01

    This article explores the role of ethics and regulation in human research conducted by organ procurement agencies; basic ethical principles for human research are outlined. Organ procurement agencies are not required to observe federal regulations; however, voluntary adherence will ensure that procurement research is conducted according to current standards of ethical practice. Although most organ procurement research will qualify for exempt status, this determination should be made by an institutional review board. Even if studies qualify for exempt status, there is a moral presumption that informed consent should be sought, unless certain narrow conditions for waiver of consent are satisfied. Finally, when future research utilizing organ procurement records is anticipated, procurement coordinators should provide sufficiently detailed information to families about such plans to permit their advance informed consent to research activities.

  7. Eleventh-century shift in timber procurement areas for the great houses of Chaco Canyon

    PubMed Central

    Guiterman, Christopher H.; Dean, Jeffrey S.

    2016-01-01

    An enduring mystery from the great houses of Chaco Canyon is the origin of more than 240,000 construction timbers. We evaluate probable timber procurement areas for seven great houses by applying tree-ring width-based sourcing to a set of 170 timbers. To our knowledge, this is the first use of tree rings to assess timber origins in the southwestern United States. We found that the Chuska and Zuni Mountains (>75 km distant) were the most likely sources, accounting for 70% of timbers. Most notably, procurement areas changed through time. Before 1020 Common Era (CE) nearly all timbers originated from the Zunis (a previously unrecognized source), but by 1060 CE the Chuskas eclipsed the Zuni area in total wood imports. This shift occurred at the onset of Chaco florescence in the 11th century, a time with substantial expansion of existing great houses and the addition of seven new great houses in the Chaco Core area. It also coincides with the proliferation of Chuskan stone tools and pottery in the archaeological record of Chaco Canyon, further underscoring the link between land use and occupation in the Chuska area and the peak of great house construction. Our findings, based on the most temporally specific and replicated evidence of Chacoan resource procurement obtained to date, corroborate the long-standing but recently challenged interpretation that large numbers of timbers were harvested and transported from distant mountain ranges to build the great houses at Chaco Canyon. PMID:26644552

  8. Eleventh-century shift in timber procurement areas for the great houses of Chaco Canyon.

    PubMed

    Guiterman, Christopher H; Swetnam, Thomas W; Dean, Jeffrey S

    2016-02-02

    An enduring mystery from the great houses of Chaco Canyon is the origin of more than 240,000 construction timbers. We evaluate probable timber procurement areas for seven great houses by applying tree-ring width-based sourcing to a set of 170 timbers. To our knowledge, this is the first use of tree rings to assess timber origins in the southwestern United States. We found that the Chuska and Zuni Mountains (>75 km distant) were the most likely sources, accounting for 70% of timbers. Most notably, procurement areas changed through time. Before 1020 Common Era (CE) nearly all timbers originated from the Zunis (a previously unrecognized source), but by 1060 CE the Chuskas eclipsed the Zuni area in total wood imports. This shift occurred at the onset of Chaco florescence in the 11th century, a time with substantial expansion of existing great houses and the addition of seven new great houses in the Chaco Core area. It also coincides with the proliferation of Chuskan stone tools and pottery in the archaeological record of Chaco Canyon, further underscoring the link between land use and occupation in the Chuska area and the peak of great house construction. Our findings, based on the most temporally specific and replicated evidence of Chacoan resource procurement obtained to date, corroborate the long-standing but recently challenged interpretation that large numbers of timbers were harvested and transported from distant mountain ranges to build the great houses at Chaco Canyon.

  9. 7 CFR 1778.22 - Planning development and procurement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Planning development and procurement. 1778.22 Section 1778.22 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE... Planning development and procurement. Planning development and procurement for grants made under this part...

  10. Procurement Career Management Handbook.

    ERIC Educational Resources Information Center

    Department of the Treasury, Washington, DC.

    This handbook is the result of the Treasury Department's efforts to increase professionalism among its procurement employees nationwide through its Procurement Career Management Program. First, the scope and objectives of the Procurement Career Management Program are discussed. The remaining sections of the handbook deal with the following program…

  11. 32 CFR 553.11 - Procurement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 3 2014-07-01 2014-07-01 false Procurement. 553.11 Section 553.11 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES ARMY NATIONAL CEMETERIES § 553.11 Procurement. Cemetery supplies and services will be procured in...

  12. 48 CFR 2804.602 - Federal Procurement Data System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...

  13. 48 CFR 2804.602 - Federal Procurement Data System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...

  14. 48 CFR 2804.602 - Federal Procurement Data System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...

  15. Navigation and Guidance for Low-Thrust Trajectories, LOTNAV

    NASA Astrophysics Data System (ADS)

    Cano, J. L.; Bello, M.; Rodriguez-Canabal, J.

    A number of interplanetary low-thrust missions have already been flown by many space agencies. Examples of already flown missions based on the use of electric propulsion are Deep Space 1, Hayabusa and SMART-1. Many others are already in the assessment phase or in the development phase itself. In such perspective, it is required by the space agencies the procurement and utilisation of assessment tools for fast prototyping in the areas of mission design and navigation. The Low-Thrust Interplanetary Navigation Tool, which is the subject of this paper, allows the mission analyst performing such type of quick assessment studies for the early phases in the development of low-thrust missions. A number of test cases on low-thrust missions are also presented along with the utilities composing the LOTNAV tool.

  16. Growing and Funding Experiential Learning Programs: A Recipe for Success

    ERIC Educational Resources Information Center

    Cowart, Monica R.

    2010-01-01

    While numerous professors and administrators can agree upon the benefits of infusing the curriculum with experiential learning, a commonly stated obstacle to widespread curricular reform is funding. Specifically, given that external institutional support can be difficult to procure, especially in uncertain economic times, institutions might…

  17. Change as a Constant: Organizational Restructuring at Carnegie Mellon University.

    ERIC Educational Resources Information Center

    Keating, Patrick J.; And Others

    1996-01-01

    The origins and strategies for change in the administrative structure of Carnegie Mellon University (Pennsylvania) are discussed, including trends within all of higher education and conditions specific to the university. Quality improvement efforts are described briefly. Special attention is given to the institution's procurement-disbursement…

  18. 32 CFR 22.205 - Distinguishing assistance from procurement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... research and development, the appropriate use of grants and cooperative agreements therefore is almost... principal purpose is the acquisition of specific deliverable items (e.g., prototypes or other hardware) for... benefit or use of the United States Government, rather than an activity whose principal purpose is...

  19. Gender and Ethnicity Classification from Small Subsets of Human Body Measurements

    DTIC Science & Technology

    2014-03-01

    SIGNATURE PAGE Using Government drawings, specifications, or other data included in this document for any purpose other than Government procurement...does not in any way obligate the U.S. Government. The fact that the Government formulated or supplied the drawings, specifications, or other data does...collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources

  20. Cloud Library for Directed Probabilistic Graphical Models

    DTIC Science & Technology

    2014-10-01

    integrated into popular big - data analytical software like Hive to lower developer friction, leveraging both the data access primitives in Hive and BayesDB...Government drawings, specifications, or other data included in this document for any purpose other than Government procurement does not in any way...obligate the U.S. Government. The fact that the Government formulated or supplied the drawings, specifications, or other data does not license the holder

  1. Specification for procurement of water-level sensing instrumentation, specification number HIF-I-1

    USGS Publications Warehouse

    Rapp, D.H.

    1982-01-01

    This specification is to communicate to instrument manufacturers the U.S. Geological Survey 's requirements. It covers systems for sensing the elevation of the water surface on open channels, rivers, lakes, reservoirs, storm-sewer pipes, and observation wells at Survey data-collection sites. The signal output (mechanical or electrical) must meet the signal input requirements of analog to digital and digital input recorders in use by the Survey. A classification of stage-sensing systems by common characteristics is used to aid Survey people making system selections. These characteristics are (1) system type (contact or noncontact), (2) sensor type and sensing distance, (3) accuracy, (4) range, (5) power requirements, (6) system size and weight, and (7) data output signal. Acceptable system requirements cover system configurations, signal outputs, materials, operation manuals, detailed environmental conditions, calibration procedures, system accuracy, power requirements, installation limitations, maintainability, safety, and workmanship. An outline of the qualification test procedures and failure criteria are also given. The Hydrologic Instrumentation Facility at NSTL Station, Mississippi will test available systems to determine if they meet the specification in this report for inclusion in the Survey 's 'Qualified Products List'. This list will be used for future procurement of water-level sensing systems by the Survey. (USGS)

  2. Toward a Framework for Dynamic Service Binding in E-Procurement

    NASA Astrophysics Data System (ADS)

    Ashoori, Maryam; Eze, Benjamin; Benyoucef, Morad; Peyton, Liam

    In an online environment, an E-Procurement process should be able to react and adapt in near real-time to changes in suppliers, requirements, and regulations. WS-BPEL is an emerging standard for process automation, but is oriented towards design-time binding of services. This missing issue can be resolved through designing an extension to WS-BPEL to support automation of flexible e-Procurement processes. Our proposed framework will support dynamic acquisition of procurement services from different suppliers dealing with changing procurement requirements. The proposed framework is illustrated by applying it to health care where different health insurance providers could be involved to procure the medication for patients.

  3. Potential fraudulent behaviors in e-procurement implementation in Indonesia

    NASA Astrophysics Data System (ADS)

    Huda, S. N.; Setiani, N.; Pulungan, R.; Winarko, E.

    2017-03-01

    Corruptions in public procurement have occurred in various parts of the world, especially in developing countries. Implementation of SPSE (electronic procurement system) as the e-procurement system in Indonesia is based on the government’s intentions towards clean and good governance by fighting corruption, collusion, and nepotism. Procurement in Indonesia is carried out through SPSE, which is developed by LKPP (Government Policy on Procurement of Goods/Services). Although this system has brought many positive effects, there are still found many practices of fraud occurring in the implementation of the system. In this paper, we try to identify these practices and then to systematically categorize and analyze them.

  4. Incidence of bacterial contamination and predisposing factors during bone and tendon allograft procurement.

    PubMed

    Terzaghi, Clara; Longo, Alessia; Legnani, Claudio; Bernasconi, Davide Paolo; Faré, Maristella

    2015-03-01

    The aim of this study was to analyze factors contributing to bacteriological contamination of bone and tendon allograft. Between 2008 and 2011, 2,778 bone and tendon allografts obtained from 196 organ and tissue donors or tissue donors only were retrospectively analysed. Several variables were taken into account: donor type (organ and tissue donors vs. tissue donor), cause of death, time interval between death and tissue procurement, duration of the procurement procedure, type of allografts, number of team members, number of trainees members, associated surgical procedures, positivity to haemoculture, type of procurement. The overall incidence of graft contamination was 23 %. The cause of death, the procurement time, the duration of procurement, the associated surgical procedures were not associated with increased risk of contamination. Significant effect on contamination incidence was observed for the number of staff members performing the procurement. In addition, our study substantiated significantly higher contamination rate among bone allografts than from tendon grafts. According to these observations, in order to minimize the contamination rate of procured musculoskeletal allografts, we recommend appropriate donor selection, use of standard sterile techniques, immediate packaging of each allograft to reduce graft exposure. Allograft procurement should be performed by a small surgical team.

  5. 78 FR 11646 - Public Availability of Federal Election Commission, Procurement Division FY 2012 Service Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...

  6. 78 FR 77450 - Public Availability of Federal Election Commission, Procurement Division FY2013 Service Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...

  7. 77 FR 14522 - Public Availability of Federal Election Commission, Procurement Division FY 2011 Service Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...

  8. 41 CFR 101-26.501-5 - Procurement time schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedules. 101-26.501-5 Section 101-26.501-5 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...

  9. 77 FR 65500 - Extension of Suspension and Debarment Exclusions, Grants and Cooperative Agreements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... Government procurement. William P. McNally, Assistant Administrator for Procurement. Accordingly, 2 CFR Part... proposes to extend coverage of nonprocurement suspension and debarment to all-tier procurement and non-procurement actions under all grants and cooperative agreements. DATES: Interested parties should submit...

  10. 76 FR 74755 - Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... DEPARTMENT OF AGRICULTURE 48 CFR Part 422 RIN 0599-AA19 Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law Violations AGENCY: Office of Procurement and Property Management, Department of Agriculture. ACTION: Proposed rule. SUMMARY: The Office of Procurement...

  11. 78 FR 70022 - Procurement List; Proposed Additions and Deletions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    .... ACTION: Proposed Additions to and Deletions from the Procurement List. SUMMARY: The Committee is proposing to add products and a service to the Procurement List that will be furnished by nonprofit agencies... the Procurement List for production by the nonprofit agencies listed: Products Kit, Paint...

  12. 77 FR 60969 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... Procurement List. Notice Correction: On 9/28/2012 (77 FR 59595), the Committee for Purchase From People Who Are Blind or Severely Disabled published a notice for additions to the Procurement List with the... and services to the Procurement List that will be furnished by nonprofit agencies employing persons...

  13. 75 FR 1355 - Procurement List Additions and Deletions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ...: Additions to and deletions from Procurement List. SUMMARY: This action adds to the Procurement List services... disabilities, and deletes from the Procurement List products and services previously furnished by such agencies... [email protected] . SUPPLEMENTARY INFORMATION: Additions On 11/6/2009 (74 FR 57453-57454), the...

  14. 76 FR 78248 - Procurement List; Addition and Deletions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    .... Service Type/Location: Laundry Service, Stratton Medical Center, 113 Holland Ave, Albany, NY. [[Page 78249...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...

  15. 24 CFR 84.84 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Procurement standards. 84.84... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Use of Lump Sum Grants § 84.84 Procurement standards. (a) Purpose of procurement standards. Paragraphs (b) through (i) of this section set forth...

  16. 13 CFR 305.6 - Allowable methods of procurement for construction services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may use alternate construction procurement methods to the traditional design/bid/build procedures... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Allowable methods of procurement...

  17. 7 CFR 235.9 - Procurement and property management standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Federal authority that has proper jurisdiction. (c) Procurement procedure. The State agency may use its... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management standards. 235.9... Procurement and property management standards. (a) Requirements. State agencies shall comply with the...

  18. 7 CFR 3565.257 - Procurement actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...

  19. 7 CFR 3565.257 - Procurement actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...

  20. 41 CFR 101-26.507-2 - Procurement time schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedule. 101-26.507-2 Section 101-26.507-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...

  1. 78 FR 18876 - Defense Federal Acquisition Regulation Supplement: United States-Korea Free Trade Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... Agreement. The Republic of Korea is already party to the World Trade Organization Government Procurement...) Agreement on Government Procurement (GPA). Although the rule now opens up Government procurement to the... 48 CFR Parts 225 and 252 Government procurement. Kortnee Stewart, Editor, Defense Acquisition...

  2. 10 CFR 1021.216 - Procurement, financial assistance, and joint ventures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... a decision on proposals and will include: (1) A brief discussion of the purpose of the procurement... 10 Energy 4 2010-01-01 2010-01-01 false Procurement, financial assistance, and joint ventures... POLICY ACT IMPLEMENTING PROCEDURES DOE Decisionmaking § 1021.216 Procurement, financial assistance, and...

  3. 42 CFR 413.200 - Payment of independent organ procurement organizations and histocompatibility laboratories.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Payment of independent organ procurement... SKILLED NURSING FACILITIES Payment for End-Stage Renal Disease (ESRD) Services and Organ Procurement Costs § 413.200 Payment of independent organ procurement organizations and histocompatibility laboratories. (a...

  4. 7 CFR 225.17 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Procurements by public sponsors comply with applicable State or local laws and the standards set forth in 7 CFR part 3016; and (2) Procurements by private nonprofit sponsors comply with standards set forth in 7 CFR... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement standards. 225.17 Section 225.17...

  5. 77 FR 37659 - Procurement List; Proposed Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... additions to the procurement list. SUMMARY: The Committee is proposing to add products and services to the...- 598-5067 and 1670-01-598-5071 to its Procurement List. The Coverage statement associated with this... connection with the products and services proposed for addition to the Procurement List. Comments on this...

  6. 32 CFR 37.1330 - Procurement contract.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in This Part § 37.1330 Procurement contract. A Federal Government procurement contract. It is a legal instrument which, consistent with 31 U.S... 32 National Defense 1 2010-07-01 2010-07-01 false Procurement contract. 37.1330 Section 37.1330...

  7. 10 CFR 603.1300 - Procurement contract.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Used in this Part § 603.1300 Procurement contract. A Federal Government procurement contract. It is a... 10 Energy 4 2010-01-01 2010-01-01 false Procurement contract. 603.1300 Section 603.1300 Energy... Government and a State, a local government, or other non-government entity when the principal purpose of the...

  8. 31 CFR 19.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Are any procurement contracts....220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2...

  9. 29 CFR 98.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Are any procurement contracts included as covered... SUSPENSION (NONPROCUREMENT) Covered Transactions § 98.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded...

  10. 29 CFR 98.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Are any procurement contracts included as covered... SUSPENSION (NONPROCUREMENT) Covered Transactions § 98.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded...

  11. 29 CFR 1471.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 4 2011-07-01 2011-07-01 false Are any procurement contracts included as covered... Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do...

  12. 29 CFR 1471.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Are any procurement contracts included as covered... Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do...

  13. 48 CFR 2406.304-70 - Approval of the justification-field procurements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Other Than Full and Open Competition 2406.304-70 Approval of the justification—field procurements. (a) The justification for other than full and open competition for field procurements shall be approved in... justification-field procurements. 2406.304-70 Section 2406.304-70 Federal Acquisition Regulations System...

  14. 20 CFR 627.420 - Procurement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Procurement. 627.420 Section 627.420... PROGRAMS UNDER TITLES I, II, AND III OF THE ACT Administrative Standards § 627.420 Procurement. (a) General. (1) For purposes of this section, the term procurement means the process which leads to any award of...

  15. Information Requirements for a Procurement Management Information System.

    DTIC Science & Technology

    1975-08-01

    Management Information System is...described and some justification for this type of procurement management information system is presented. A literature search was made to determine...information systems. If information requirements are correctly identified and satisfied by a procurement management information system , contract administration and procurement management can be

  16. Setting up a clinical trial for a novel disease: a case study of the Doxycycline for the Treatment of Nodding Syndrome Trial – challenges, enablers and lessons learned

    PubMed Central

    Anguzu, Ronald; Akun, Pamela R; Ogwang, Rodney; Shour, Abdul Rahman; Sekibira, Rogers; Ningwa, Albert; Nakamya, Phellister; Abbo, Catherine; Mwaka, Amos D; Opar, Bernard; Idro, Richard

    2018-01-01

    ABSTRACT A large amount of preparation goes into setting up trials. Different challenges and lessons are experienced. Our trial, testing a treatment for nodding syndrome, an acquired neurological disorder of unknown cause affecting thousands of children in Eastern Africa, provides a unique case study. As part of a study to determine the aetiology, understand pathogenesis and develop specific treatment, we set up a clinical trial in a remote district hospital in Uganda. This paper describes our experiences and documents supportive structures (enablers), challenges faced and lessons learned during set-up of the trial. Protocol development started in September 2015 with phased recruitment of a critical study team. The team spent 12 months preparing trial documents, procurement and training on procedures. Potential recruitment sites were pre-visited, and district and local leaders met as key stakeholders. Key enablers were supportive local leadership and investment by the district and Ministry of Health. The main challenges were community fears about nodding syndrome, adverse experiences of the community during previous research and political involvement. Other challenges included the number and delays in protocol approvals and lengthy procurement processes. This hard-to-reach area has frequent power and Internet fluctuations, which may affect cold chains for study samples, communication and data management. These concerns decreased with a pilot community engagement programme. Experiences and lessons learnt can reduce the duration of processes involved in trial-site set-up. A programme of community engagement and local leader involvement may be key to the success of a trial and in reducing community opposition towards participation in research. PMID:29382251

  17. Setting up a clinical trial for a novel disease: a case study of the Doxycycline for the Treatment of Nodding Syndrome Trial - challenges, enablers and lessons learned.

    PubMed

    Anguzu, Ronald; Akun, Pamela R; Ogwang, Rodney; Shour, Abdul Rahman; Sekibira, Rogers; Ningwa, Albert; Nakamya, Phellister; Abbo, Catherine; Mwaka, Amos D; Opar, Bernard; Idro, Richard

    2018-01-01

    A large amount of preparation goes into setting up trials. Different challenges and lessons are experienced. Our trial, testing a treatment for nodding syndrome, an acquired neurological disorder of unknown cause affecting thousands of children in Eastern Africa, provides a unique case study. As part of a study to determine the aetiology, understand pathogenesis and develop specific treatment, we set up a clinical trial in a remote district hospital in Uganda. This paper describes our experiences and documents supportive structures (enablers), challenges faced and lessons learned during set-up of the trial. Protocol development started in September 2015 with phased recruitment of a critical study team. The team spent 12 months preparing trial documents, procurement and training on procedures. Potential recruitment sites were pre-visited, and district and local leaders met as key stakeholders. Key enablers were supportive local leadership and investment by the district and Ministry of Health. The main challenges were community fears about nodding syndrome, adverse experiences of the community during previous research and political involvement. Other challenges included the number and delays in protocol approvals and lengthy procurement processes. This hard-to-reach area has frequent power and Internet fluctuations, which may affect cold chains for study samples, communication and data management. These concerns decreased with a pilot community engagement programme. Experiences and lessons learnt can reduce the duration of processes involved in trial-site set-up. A programme of community engagement and local leader involvement may be key to the success of a trial and in reducing community opposition towards participation in research.

  18. NRC assessment of improvements in licensee procurement and dedication programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grimes, B.K.; Potapovs, U.; Campbell, L.L.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) recently conducted a series of on-site assessments at selected nuclear plants to review improvements that the licenses had made to their procurement and dedication activities. The assessments included an evaluation of the progress made by licensees to strengthen their commercial-grade dedication programs to comply with 10CRF50, Appendix B, and to implement the comprehensive procurement improvements suggested in Nuclear Management and Resource Council (NUMARC) publication 901-3. This paper discusses the overall purpose of the assessments, procurement areas assessed, major strengths and weaknesses identified in licensee procurement programs, and the NRC's perspective of the industry's responsemore » to NUMARC procurement initiatives.« less

  19. Report: Examination of Costs Claimed Under EPA Cooperative Agreements CB-97324701 Through CB-97324705 Awarded to Alliance for the Chesapeake Bay, Inc.

    EPA Pesticide Factsheets

    Report #12-4-0720, August 22, 2012. The recipient did not comply with the Code of Federal Regulations (CFR)—specifically, 40 CFR Part 30 and 2 CFR Part 230—regarding procurement and financial management requirements.

  20. 13 CFR 125.5 - Certificate of Competency Program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the type of product being procured or the specific contract at issue. (iv) A non-manufacturer making... application. (1) The COC review process is not limited to the areas of nonresponsibility cited by the contracting officer. SBA may, at its discretion, independently evaluate the COC applicant for all elements of...

  1. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  2. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  3. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  4. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  5. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  6. 7 CFR 1599.7 - Transportation of goods.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... other goods such as bags that may be provided by FAS under the McGovern-Dole Program will be acquired under a specific agreement in the manner determined by FAS. Such transportation will be acquired by: (1) FAS in accordance with the Federal Acquisition Regulations (FAR), the Department's procurement...

  7. 7 CFR 1599.7 - Transportation of goods.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... other goods such as bags that may be provided by FAS under the McGovern-Dole Program will be acquired under a specific agreement in the manner determined by FAS. Such transportation will be acquired by: (1) FAS in accordance with the Federal Acquisition Regulations (FAR), the Department's procurement...

  8. 7 CFR 1599.7 - Transportation of goods.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... other goods such as bags that may be provided by FAS under the McGovern-Dole Program will be acquired under a specific agreement in the manner determined by FAS. Such transportation will be acquired by: (1) FAS in accordance with the Federal Acquisition Regulations (FAR), the Department's procurement...

  9. 10 CFR 33.15 - Requirements for the issuance of a Type C specific license of broad scope.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... bachelor level, or equivalent training and experience, in the physical or biological sciences or in..., radiation detection instrumentation, and biological hazards of exposure to radiation appropriate to the type... controls and provisions relating to procurement of byproduct material, procedures, record keeping, material...

  10. The European Mobile System (EMS)

    NASA Technical Reports Server (NTRS)

    Jongejans, A.; Rogard, R.; Mistretta, I.; Ananasso, F.

    1993-01-01

    The European Space Agency is presently procuring an L band payload in order to promote a regional European L band system coping with the specific needs of the European market. The payload, and the two communications systems to be supported, are described below. The potential market for EMS in Europe is discussed.

  11. 78 FR 13706 - Public Availability of FY 2011 Service Contract Inventory Analysis, FY 2012 Service Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... analysis provides information on specific service contract actions that were analyzed as part of the FY... analysis at the following link: http://www.usitc.gov/procurement/ . FOR FURTHER INFORMATION CONTACT... INTERNATIONAL TRADE COMMISSION Public Availability of FY 2011 Service Contract Inventory Analysis...

  12. 78 FR 40033 - Organ Procurement and Transplantation Network

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... regarding OPTN policy development for VCAs. They noted that VCA transplantation remains an experimental... best use of organs; shall be specific for each organ type; shall be designed to avoid wasting organs... suggested that, as an experimental field and given the small number of VCA transplants at this time, VCA...

  13. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  14. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  15. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  16. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  17. 41 CFR 101-26.602-4 - Procurement of coal.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  18. Greening Operations Management: An Online Sustainable Procurement Course for Practitioners

    ERIC Educational Resources Information Center

    Walker, Helen L.; Gough, Stephen; Bakker, Elmer F.; Knight, Louise A.; McBain, Darian

    2009-01-01

    In the Operations Management field, sustainable procurement has emerged as a way to green the purchasing and supply process. This paper explores issues in sustainable procurement training. The authors formed an interdisciplinary team to design, deliver and evaluate a training programme to promote and develop sustainable procurement in the United…

  19. 13 CFR 121.409 - What size standard applies in an unrestricted procurement for Certificate of Competency purposes?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... unrestricted procurement for Certificate of Competency purposes? 121.409 Section 121.409 Business Credit and... an unrestricted procurement for Certificate of Competency purposes? For the purpose of receiving a Certificate of Competency in an unrestricted procurement, the applicable size standard is that corresponding...

  20. The NGST Science Instrument Procurement Plan

    NASA Astrophysics Data System (ADS)

    Greenhouse, M. A.; NGST Project Office Team

    1998-12-01

    We display the top level plan for procurement of science instruments for NGST. The procurement process and time line schedule leading to a NASA AO solicitation for flight instruments is presented and discussed. This procurement schedule includes important milestones that will be reached during 1999 and that are of potential interest to NGST instrument offerors.

  1. 13 CFR 125.2 - What are SBA's and the procuring agency's responsibilities when providing contracting assistance...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... justified); is for construction and seeks to package or consolidate discrete construction projects; or if a... alternatives may include: (A) Breaking up the procurement into smaller discrete procurements, especially construction acquisitions that can be procured as separate projects; (B) Breaking out one or more discrete...

  2. 22 CFR 208.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  3. 22 CFR 208.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  4. 22 CFR 1508.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  5. 5 CFR 919.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Are any procurement contracts included as...) Covered Transactions § 919.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency...

  6. A Blueprint for Effective and Adaptable School District Procurement

    ERIC Educational Resources Information Center

    Maas, Tricia; Lake, Robin

    2015-01-01

    In public education, procurement reform has been all but ignored in policy discussions and procurement policies have remained virtually untouched. But the high price of ignoring procurement is becoming clear to people trying to reform education on the ground. Often involving long, cumbersome processes and risk-averse central office cultures,…

  7. eProcurement: The Technology of Smart Shopping

    ERIC Educational Resources Information Center

    Briggs, Linda L.

    2006-01-01

    This article talks about eProcurement and examines why school districts are so slow to make the transition. Despite the billions of dollars that flow from schools each year in procurement spending, most K-12 districts in the United States, especially smaller ones, persist in using paperbased procurement models in which supplies are identified in…

  8. 76 FR 34143 - Implementation of OMB Guidance on Government-Wide Debarment and Suspension (Non-procurement)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-13

    ... Guidance on Government-Wide Debarment and Suspension (Non-procurement) AGENCY: U.S. Agency for...-procurement), currently located in Part 208 of Title 22 of the Code of Federal Regulations (CFR), and [email protected] , fax (202) 567-4695 FOR FURTHER INFORMATION CONTACT: Melita E. Yearwood, Procurement Analyst...

  9. 48 CFR 217.172 - Multiyear contracts for supplies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of units to be procured through the contract; and (2) In the case of a contract for procurement of aircraft, the budget request includes full funding of procurement funds for production beyond advance procurement activities of aircraft units to be produced in the fiscal year covered by the budget. (d)(1) The...

  10. Study to develop improved fire resistant aircraft passenger seat materials, phase 1

    NASA Technical Reports Server (NTRS)

    Trabold, E. L.

    1977-01-01

    The procurement and testing of a wide range of candidate materials is reported. Improved fire resistant nonmetallic materials were subjected to tests to evaluate their thermal characteristics, such as burn, smoke generation, heat release rate and toxicity. In addition, candidate materials were evaluated for mechanical, physical and aesthetic properties. Other properties considered included safety, comfort, durability and maintainability. The fiscal year 1977 and the projected 1980 cost data were obtained for aircraft seat materials.

  11. Unsteady Viscous Flow in a High Speed Core Compressor

    DTIC Science & Technology

    1990-12-01

    in a High Speed Core Compressor by M. A. Cherrett DTICJ. D.Bryc ELECTE J. D. Bryce MAR 2 81991 ED Procurement Executive, Ministry of Defence...ESTABLISHMENT Technical Memorandum P 1198 Received for printing 10 December 1990 UNSTEADY VISCOUS FLOW IN A HIGH SPEED CORE COMPRESSOR by M. A. Cherrett J. D...processed in the Compressor," ASME PaperNo 89-GT-24 following manner to determine the periodic (phase-locked Cherrett , MA, 1990, Temperature Error

  12. Annual Report Number 3, 1986.

    DTIC Science & Technology

    1986-01-01

    REPORT 1986 as DISTPJUtIoN STATE’Tr A Agpprovod for public reI~laeC D is riL u ti o ’ Uni e L h i DIRECTORATE SJUN 109 OF D MANAGEMENT SCIENCES AFLC/XRS...21 2. Incorporate Aircraft Availability Into D041 . 22 3. Weapon System Phase In/Out And The Aircraft Availability Procurement Model (AAPM...Capabilities .. ......... 43 2. Evaluation Of CONUS Cargo Movement Requirements ........ ................. 4 3. Material Management Manpower Standars . 4.....44 V

  13. Creating Cost Growth Models for the Engineering and Manufacturing Development Phase of Acquisition Using Logistic and Multiple Regression

    DTIC Science & Technology

    2004-03-01

    constant variance via an analysis of the residuals, as well as the Breusch - Pagan test (see Figure 3 below). As a result, we follow the footsteps of...reasonably normal, which ensures that our residuals meet the assumption of constant variance by passing the Breusch - Pagan test (see Figure 4 below...sections for Research and Development, Test and Evaluation (RDT&E), procurement and military construction (Jarvaise, 1996:3). While differing

  14. Influences on the Timing and Frequency of Cancellations and Truncations of Major Defense Acquisition Programs

    DTIC Science & Technology

    2017-03-01

    the start of the bust phase following the Carter-Reagan boom. From peak procurement Budget Authority of $183.9 billion (FY 2017 dollars) in FY 1985...to close a funding gap involves choices among bad alternatives—cancellations, delays in new starts , stretches of existing programs, acceptance of...less capable alternatives in some cases, and adoption of very optimistic costing and programmatic decisions for both new starts and—to the extent

  15. Market size and sales pattern of tuberculosis drugs in the Philippines.

    PubMed

    Islam, T; van Weezenbeek, C; Vianzon, R; Garfin, A M C G; Hiatt, T; Lew, W J; Tisocki, K

    2013-12-21

    To identify the availability, types and quantity of anti-tuberculosis drugs in the public and private sectors from 2007 to 2011 in the Philippines. Analysis of the procurement of and sales data on anti-tuberculosis drugs from both the public and private sectors from 2007 to 2011. Publicly procured anti-tuberculosis drugs were sufficient to treat all reported new tuberculosis (TB) cases from 2007 to 2011 in the Philippines. Nevertheless, the volume of anti-tuberculosis drugs in the private sector would have sufficed for the intensive phase of treatment for an additional 250 000 TB patients annually, assuming compliance with national treatment guidelines. Fixed-dose combination drugs comprised the main bulk (81%) of private market sales, while sales of loose drugs decreased over the years. Combining public and private sales in 2011, 484 725 new TB patients, i.e., 2.4 times the number of notified cases, could have been placed on treatment and treated for at least the intensive phase. Key second-line drugs are not available in the private market, making it impossible to design an adequate treatment regimen for multidrug-resistant TB (MDR-TB) in the private sector. An enormous quantity of anti-tuberculosis drugs was channelled through the private market outside the purview of the Philippine National Tuberculosis Control Program, suggesting significant out-of-pocket expenditure, severe underreporting of TB cases and/or misuse of drugs due to overdiagnosis and overtreatment.

  16. Critical factors for sustainable food procurement in zoological collections.

    PubMed

    Hanson, Jonathan H

    2015-01-01

    Food procurement can play an important role in sustainable food supply chain management by zoos, linking organizational operations to the biodiversity conservation and sustainability mission of zoological collections. This study therefore examines the critical factors that shape sustainable food procurement in zoo and aquariums. Using a web-based survey data was collected from 41 members of the British and Irish Association of Zoos and Aquariums (BIAZA). This included information on the sustainable food procurement practices of these institutions for both their human and animal food supply chains, as well as profile information and data on the factors contributing to and inhibiting sustainable procurement practices. Zoological collections operated by charities, and those with a certified sustainability standard, were found to have significantly higher levels of sustainable food procurement. Zoos and aquariums whose human food operations were not contracted to an external party were also found to have significantly higher levels of sustainable food procurement in their human food supply chain. The most important drivers of sustainable food procurement were cost savings, adequate financial support and improved product quality. The highest ranking barriers were higher costs, other issues taking priority and a lack of alternative suppliers. The results suggest that a number of critical factors shape sustainable food procurement in zoological collections in the British Isles. Financial factors, such as cost savings, were important considerations. The significance of mission-related factors, such as charity status, indicated that core values held by zoos and aquariums can also influence their food procurement practices. © 2015 Wiley Periodicals, Inc.

  17. Comparative assessment of medicine procurement prices in the United Nations Relief and Works Agency for Palestine Refugees in the Near East (UNRWA).

    PubMed

    Ewen, Margaret; Al Sakit, Maisa; Saadeh, Rawan; Laing, Richard; Vialle-Valentin, Catherine; Seita, Akihiro; Bunders, Joske

    2014-01-01

    The United Nations Relief and Works Agency for Palestine Refugees in the Near East (UNRWA), the main primary healthcare provider for 4.9 million Palestinian refugees, spent USD18.3 million on essential medicines dispensed free-of-charge through clinics in five areas of operation ('fields'): Gaza, Jordan, Lebanon, Syria, and the West Bank (2010). Faced with budget contraints and an increasing demand for medicines to treat chronic conditions, the objective of our study was to assess UNRWA's medicine procurement prices to see if savings could be possible. In July 2011, data was collected from UNRWA headquarters in Jordan. Price analyses focused on the top 80 medicines by value, accounting for 93% of pharmaceutical expenditure from the General Fund, with comparisons to international, regional and national references. Prices were also compared for the few medicines procured both through UNRWA's central tender (centrally) and by the fields directly (locally). Central procurement prices did not differ markedly from reference prices: median ratios of UNRWA prices to Management Sciences for Health's International Drug Price Indicator Guide, Jordan's Joint Procurement Department, Gulf Cooperation Council, and IDA Foundation bulk packs were 0.99, 1.00, 0.98 and 1.12 respectively. Applying the lowest comparator price to five comparatively higher priced medicines would yield savings of USD1.4 million. Local procurements were generally less cost-effective than central tender procurement, with notable differences across fields and medicines. Overall, UNRWA's procurement prices were competitive despite the relatively small quantities procured. Regular monitoring of procurement prices and quantities is needed in order to make informed decisions. Our evaluation also underscores the heavy burden of antidiabetic medicines and antimicrobials on UNRWA procurement expenditure.

  18. Medicine procurement in hospital pharmacies of Nepal: A qualitative study based on the Basel Statements.

    PubMed

    Shrestha, Mina; Moles, Rebekah; Ranjit, Eurek; Chaar, Betty

    2018-01-01

    Accessibility and affordability of evidence-based medicines are issues of global concern. For low-income countries like Nepal, it is crucial to have easy and reliable access to affordable, good-quality, evidence-based medicines, especially in the aftermath of natural or manmade disasters. Availability of affordable and evidence-based high quality medicines depends on the medicine procurement procedure, which makes it an important aspect of healthcare delivery. In this study, we aimed to investigate medicine procurement practices in hospital pharmacies of Nepal within the framework of International Pharmaceutical Federation [FIP] hospital pharmacy guidelines "the Basel Statements". We conducted semi-structured interviews with hospital pharmacists or procurement officers in hospital pharmacies of four major regions in Nepal to explore procurement practices. Data were collected until saturation of themes, analysed using the framework approach, and organised around the statements within the procurement theme of the Basel Statements. Interviews conducted with 53 participants revealed that the procurement guidelines of the Basel Statements were adopted to a certain extent in hospital pharmacies of Nepal. It was found that the majority of hospital pharmacies in Nepal reported using an expensive direct-procurement model for purchasing medicines. Most had no formulary and procured medicines solely based on doctors' prescriptions, which were heavily influenced by pharmaceutical companies' marketing strategies. Whilst most procured only registered medicines, a minority reported purchasing unregistered medicines through unauthorised supply-chains. And although the majority of hospital pharmacies had some contingency plans for managing medicine shortages, a few had none. Procurement guidelines of the Basel Statements were thus found to be partially adopted; however, there is room for improvement in current procurement practices in hospital pharmacies of Nepal. Adoption and regulation of national and international policies is recommended for enhancing medicine accessibility, as well as improving preparedness for health emergencies during natural disasters and health epidemics.

  19. Medicine procurement in hospital pharmacies of Nepal: A qualitative study based on the Basel Statements

    PubMed Central

    Ranjit, Eurek

    2018-01-01

    Background Accessibility and affordability of evidence-based medicines are issues of global concern. For low-income countries like Nepal, it is crucial to have easy and reliable access to affordable, good-quality, evidence-based medicines, especially in the aftermath of natural or manmade disasters. Availability of affordable and evidence-based high quality medicines depends on the medicine procurement procedure, which makes it an important aspect of healthcare delivery. In this study, we aimed to investigate medicine procurement practices in hospital pharmacies of Nepal within the framework of International Pharmaceutical Federation [FIP] hospital pharmacy guidelines “the Basel Statements”. Method We conducted semi-structured interviews with hospital pharmacists or procurement officers in hospital pharmacies of four major regions in Nepal to explore procurement practices. Data were collected until saturation of themes, analysed using the framework approach, and organised around the statements within the procurement theme of the Basel Statements. Results Interviews conducted with 53 participants revealed that the procurement guidelines of the Basel Statements were adopted to a certain extent in hospital pharmacies of Nepal. It was found that the majority of hospital pharmacies in Nepal reported using an expensive direct-procurement model for purchasing medicines. Most had no formulary and procured medicines solely based on doctors’ prescriptions, which were heavily influenced by pharmaceutical companies’ marketing strategies. Whilst most procured only registered medicines, a minority reported purchasing unregistered medicines through unauthorised supply-chains. And although the majority of hospital pharmacies had some contingency plans for managing medicine shortages, a few had none. Conclusions Procurement guidelines of the Basel Statements were thus found to be partially adopted; however, there is room for improvement in current procurement practices in hospital pharmacies of Nepal. Adoption and regulation of national and international policies is recommended for enhancing medicine accessibility, as well as improving preparedness for health emergencies during natural disasters and health epidemics. PMID:29401474

  20. Making a case for controlled organ donation after cardiac death: the story of Italy's first experience.

    PubMed

    Vergano, Marco; Magavern, Emma; Baroncelli, Francesca; Frisenda, Valeria; Fonsato, Alessia; Artusio, Diego; Castioni, Carlo Alberto; De Piero, Maria Elena; Abelli, Massimo; Ticozzelli, Elena; Livigni, Sergio

    2017-04-01

    Donation after circulatory death (DCD) is a valuable option for the procurement of organs for transplantation. In Italy, organ procurement after controlled DCD is legally and ethically conceivable within the current legislative framework. However, although formal impediments do not exist, the health care team is faced with many obstacles that may hinder the implementation of such programs. We report the case of Italy's first controlled DCD, specifically discussing the role of the patient's family in the shared decision-making process. In our case, the death of the patient subsequent to the withdrawal of life-sustaining therapies was consistent with the patient's wishes, showing respect for his dignity and honoring his autonomy, as expressed to his family previously. By making donation possible, the medical team was able to fulfill the family's last request on behalf of the patient. This case should stimulate deliberation regarding the potential to shorten the 20-minute no-touch period currently in place in Italy. Such an action would not have injured this patient and would certainly have increased the quality of the procured organs. Copyright © 2016 Elsevier Inc. All rights reserved.

  1. Subscale Diffuser Testing, E-3 produces first steam

    NASA Image and Video Library

    2007-10-25

    Phase 2 of the A-3 Test Facility Subscale Diffuser Risk Mitigation Project at Stennis Space Center reached a milestone Oct. 25 when the E-3 Test Facility produced superheated (500+ degrees) steam for approximately 3 seconds at more than 400 psi. The test team, led by Barry Robinson of NASA's Test Projects Office, followed that success with further tests to lengthen the duration of steam production. On Nov. 1, they were able to maintain a consistent pressure and temperature of steam for 60 seconds. In December, the team began Phase 3 of the testing, providing data for the design and procurement to build the full-scale version of the steam diffuser for SSC's A-3 Test Stand.

  2. Subscale Diffuser Testing, E-3 produces first steam

    NASA Technical Reports Server (NTRS)

    2007-01-01

    Phase 2 of the A-3 Test Facility Subscale Diffuser Risk Mitigation Project at Stennis Space Center reached a milestone Oct. 25 when the E-3 Test Facility produced superheated (500+ degrees) steam for approximately 3 seconds at more than 400 psi. The test team, led by Barry Robinson of NASA's Test Projects Office, followed that success with further tests to lengthen the duration of steam production. On Nov. 1, they were able to maintain a consistent pressure and temperature of steam for 60 seconds. In December, the team began Phase 3 of the testing, providing data for the design and procurement to build the full-scale version of the steam diffuser for SSC's A-3 Test Stand.

  3. Effect of reinforcement learning on coordination of multiangent systems

    NASA Astrophysics Data System (ADS)

    Bukkapatnam, Satish T. S.; Gao, Greg

    2000-12-01

    For effective coordination of distributed environments involving multiagent systems, learning ability of each agent in the environment plays a crucial role. In this paper, we develop a simple group learning method based on reinforcement, and study its effect on coordination through application to a supply chain procurement scenario involving a computer manufacturer. Here, all parties are represented by self-interested, autonomous agents, each capable of performing specific simple tasks. They negotiate with each other to perform complex tasks and thus coordinate supply chain procurement. Reinforcement learning is intended to enable each agent to reach a best negotiable price within a shortest possible time. Our simulations of the application scenario under different learning strategies reveals the positive effects of reinforcement learning on an agent's as well as the system's performance.

  4. Report on the Installation and Preparedness of a Protochips Fusion in-situ Heating Holder for TEM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Edmondson, Philip D.

    2017-03-01

    This brief report documents the procurement and installation of a Protochips Fusion (formerly Aduro) high-temperature, high stability transmission electron microscopy (TEM) specimen holder that allows for the high spatial resolution characterization of material specimens at high temperature in situ of an electron microscope. This specimen holder was specifically procured for use with The FEI Talos F200X Scanning/Transmission Electron Microscope (STEM) in Oak Ridge National Laboratory’s (ORNL’s) Low Activation Materials Development and Analysis (LAMDA) Laboratory. The Protochips Fusion holder will enable high-resolution structural and chemical analysis of irradiated materials at high temperature, becoming a unique capability worldwide, and would encourage high-qualitymore » in situ experiments to be conducted on irradiated materials.« less

  5. 41 CFR 101-26.509-2 - Requisitioning tabulating machine cards not available from Federal Supply Schedule contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement... contracts will not adequately serve the end-use purpose. GSA will notify the requesting agency in writing of... in which the requisitioner is located. GSA will either arrange for procurement of the items or...

  6. 41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...

  7. 41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...

  8. 41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...

  9. 41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...

  10. 41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...

  11. 41 CFR 101-26.602-5 - Procurement of natural gas from the wellhead and other supply sources.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-26.602-5 Procurement of natural gas from the wellhead and other supply sources. (a) Natural gas... natural gas procurements at a facility exceed 20,000 mcf annually and the facility can accept... natural gas shall be forwarded to the Public Utilities Division (PPU), Office of Procurement, General...

  12. An Identification of Problems Relating to Federal Procurement of Library Materials Prepared for Commission on Government Procurement.

    ERIC Educational Resources Information Center

    Federal Library Committee, Washington, DC.

    The Federal Library Committee through the Task Force on Procurement Procedures in Federal Libraries is examining all problems and is recommending policies, procedures, and practices which will maximize the efficient procurement of library materials. It is suggested that the vehicle for this investigation be the appropriate Commission on Government…

  13. Determinants of Non-Compliance of Public Procurement Regulations in Kenyan Secondary Schools

    ERIC Educational Resources Information Center

    Migosi, Joash; Ombuki, Charles; Ombuki, Kennedy N.; Evusa, Zablon

    2013-01-01

    Kenya's public procurement and disposal Act of 2005 sets out clear rules and procedures for public procurement entities to follow; however this does not seem to be the case. This study sought to examine determinants of Non-compliance to the Public Procurement Regulations in Kenyan Secondary Schools. The study adopted a descriptive survey research.…

  14. 41 CFR 101-26.602-5 - Procurement of natural gas from the wellhead and other supply sources.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-26.602-5 Procurement of natural gas from the wellhead and other supply sources. (a) Natural gas... natural gas procurements at a facility exceed 20,000 mcf annually and the facility can accept... natural gas shall be forwarded to the Public Utilities Division (PPU), Office of Procurement, General...

  15. A Study of the Implementation of Current Cost Accounting in the Republic of Korea Army Procurement Systems.

    DTIC Science & Technology

    1986-06-01

    financial reporting in Republic of Korea Army (ROKA) procurement. A discussion of the nature of the ROKA procurement system and two alternatives to historical cost financial statements are presented. The concepts, methods and procedures of the historical cost/constant dollars financial statements are described. The proposal for current cost/constant dollars financial statements is presented and emphasis is given to the description of four problems in existing ROKA procurement due to using inadequate accounting information. Keywords: Cost accounting, Procurement, Current

  16. BIM-Based E-Procurement: An Innovative Approach to Construction E-Procurement

    PubMed Central

    2015-01-01

    This paper presents an innovative approach to e-procurement in construction, which uses building information models (BIM) to support the construction procurement process. The result is an integrated and electronic instrument connected to a rich knowledge base capable of advanced operations and able to strengthen transaction relationships and collaboration throughout the supply chain. The BIM-based e-procurement prototype has been developed using distinct existing electronic solutions and an IFC server and was tested in a pilot case study, which supported further discussions of the results of the research. PMID:26090518

  17. Trends in procurement costs for HIV commodities: a 7-year retrospective analysis of global fund data across 125 countries.

    PubMed

    Wafula, Francis; Agweyu, Ambrose; Macintyre, Kate

    2014-04-01

    Nearly 40% of Global Fund money goes toward procurement. However, no analyses have been published to show how costs vary across regions and time, despite the availability of procurement data collected through the Global Fund's price and quality reporting system. We analyzed data for the 3 most widely procured commodities for the prevention, diagnosis, and treatment of HIV. These were male condoms, HIV rapid tests, and the antiretroviral (ARV) combination of lamivudine/nevirapine/zidovudine. The compared costs, first across time (2005-2012), then across regions, and finally, between individual procurement reported through the price and quality reporting and pooled procurement reported through the Global Fund's voluntary pooled procurement system. All costs were adjusted for inflation and reported in US dollars. There were 2337 entries from 578 grants in 125 countries. The procurement cost for the ARV dropped substantially over the period, whereas those for condoms and HIV tests remained relatively stable. None of the commodity prices increased. Regional variations were pronounced for HIV tests, but minimal for condoms and the ARV. The unit cost for the 3-table ARV combination, for instance, varied between US$0.15 and US$0.23 in South Asia and the Eastern Europe/Central Asia regions, respectively, compared with a range of $0.23 (South Asia)-$1.50 (Eastern Europe/Central Asia) for a single diagnostic test. Pooled procurement lowered costs for condoms but not the other commodities. We showed how global procurement costs vary by region and time. Such analyses should be done more often to identify and correct market insufficiencies.

  18. The procurement of NHS dental services--a guide.

    PubMed

    Jones, C L; Rooney, E

    2009-05-23

    This paper gives an overview of the strategic background for procurement of NHS primary care dental services and an outline of the processes involved in procurement. The main aim is to bring procurement to the attention of a wider audience of dental practitioners and provide advice for potential primary care dental service providers. The move towards local procurement of healthcare services, including primary care dental services, has been shaped by a number of strategic Government publications and is supported by law. In line with other public bodies, the NHS is subject to the European Union and international rules regarding procurement and awarding contracts. Primary Care Trust (PCT) Dental Service Commissioners have to ensure that their procurement strategy is transparent and non-discriminatory so that all providers have an equal opportunity to compete for contracts. In order to successfully tender for future service provision contracts, dental practitioners not only need to be aware of the process of procurement and its associated legal requirements. It is also important that they have a grasp of the expectations of PCTs. Commissioning services via procurement is set to become more commonplace and it is likely, in time, that competition for some contracts will increase in intensity. The importance of researching proposals thoroughly and adopting a professional, businesslike approach to tendering cannot be understated as this maximises chance of success in the new commissioning environment.

  19. GAIN Premix Facility: an innovative approach for improving access to quality vitamin and mineral premix in fortification initiatives.

    PubMed

    Guinot, Philippe; Jallier, Vincent; Blasi, Alessandro; Guyondet, Christophe; Van Ameringen, Marc

    2012-12-01

    Vitamin and mineral premix is one of the most significant recurring input costs for large-scale food fortification programs. A number of barriers exist to procuring adequate quality premix, including accessing suppliers, volatile prices for premix, lack of quality assurance and monitoring of delivered products, and lack of funds to purchase premix. To develop and test a model to procure premix through a transparent and efficient process in which an adequate level of quality is guaranteed and a financial mechanism is in place to support countries or specific target groups when there are insufficient resources to cover the cost of premix. Efforts focused on premixes used to fortify flour, such as wheat or maize (iron, zinc, B vitamins, and vitamin A), edible oils (vitamins A and D), and other food vehicles, such as fortified complementary foods, complementary food supplements, and condiments. A premix procurement model was set up with three distinct components: a certification process that establishes industry-wide standards and guidelines for premix, a procurement facility that makes premix more accessible to countries and private industry engaged in fortification, and a credit facility mechanism that helps projects finance premix purchases. After three years of operation, 15 premix suppliers and 29 micronutrient manufacturers have been certified, and more than US$23 million worth of premix that met quality standards has been supplied in 34 countries in Africa, Central and Southern Asia, and Eastern Europe, reaching an estimated 242 million consumers. The Premix Facility demonstrated its effectiveness in ensuring access to high-quality premixes, therefore enabling the success of various fortification programs.

  20. Berkeley Lab - Materials Sciences Division

    Science.gov Websites

    MSD Support Human Resources Facilities & Space Planning Procurement and Property Proposals & Planning Procurement and Property Proposals & Finance Templates Travel Procurement and Property This

  1. 48 CFR 219.201 - General policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...

  2. 48 CFR 219.201 - General policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...

  3. 48 CFR 219.201 - General policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...

  4. 48 CFR 219.201 - General policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...

  5. 48 CFR 219.201 - General policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...

  6. 7 CFR 226.22 - Procurement standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... affirmative action in support of women's business enterprises. (g) All procurement transactions, regardless of... history of a procurement. These records shall include, but are not necessarily limited to information...

  7. 24 CFR 943.150 - What procurement standards apply to a PHA's joint venture partner?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false What procurement standards apply to... Subsidiaries, Affiliates, Joint Ventures in Public Housing § 943.150 What procurement standards apply to a PHA..., accordingly, is not required to comply with part 84 or part 85 of this title in its procurement of goods and...

  8. Developing trends in public procurement and auditing - a unique symposium for space and defence procurement

    NASA Astrophysics Data System (ADS)

    Morel de Westgaver, Eric; van Beekhuizen, Pieter; Fiorilli, Stefano M.

    2007-02-01

    Space projects are marked by their high technologies and their lengthy development and operations. The procurement process is a critical element that must adapt to a changing industrial landscape and new methods and tools, such as electronic procurement. ESA will host an international symposium in May [2007] to bring all the major players together.

  9. The model and moral justification for organ procurement in Japan.

    PubMed

    Bagheri, Alireza; Shoji, Shin'ichi

    2005-01-01

    Organ replacement therapy is a part of medical practice in today's world and many countries have adopted the required guidelines and regulations. Establishing the basis on which organs can be removed, is still one of the most controversial issues of health policy making in the debate. The critical disparity between supply and demand in organ replacement therapy, even with the existence of social acceptance and organ transplantation law, turns attention towards the importance of an appropriate model of organ procurement. This model should be able to expand the donor pool and increase the organ retrieval rate by converting potential donors to actual ones. In Japan the organ transplantation law which was enacted in 1997 allows organ procurement from brain death as well as non-heart beating cadavers according to restricted conditions. One such condition includes the necessity of both the donor's and the family's written consent. Under current organ procurement policy, organs from only 29 brain death cases have been so far procured. In this paper after examining the current organ procurement system in Japan and the moral justifications behind different organ procurement models we conclude that the Japanese system does not clearly fall into one of the popular organ procurement models.

  10. Specifications of the International Cooperation Administration for DDT water-dispersible powder for use in malaria control programmes

    PubMed Central

    Pearce, George W.; Gooden, E. L.; Johnson, Donald R.

    1959-01-01

    Background information is presented on the development of specifications for 75% DDT water-dispersible powder for use in malaria control programmes supported by the International Cooperation Administration (ICA) of the United States Government. Early difficulties with DDT powders used in these programmes were investigated and it was found that the most critical requirements involved packaging, suspensibility and storage stability. ICA specifications were evolved to meet these requirements. The suspensibility test developed is described, and the importance of inspection of the material procured is discussed. PMID:14431217

  11. Proposed seed collection zones for the central states

    Treesearch

    Gustaf A. Limstrom

    1963-01-01

    Seed collection zones have been established in several regions and countries to insure that the sources of seed used in tree planting are properly selected. Use of such zones has undoubtedly improved the survival and growth of trees in plantations and has also facilitated the establishment of specifications for seed procurement and seed certification.

  12. 75 FR 50731 - Federal Acquisition Regulation; Unique Procurement Instrument Identifiers (PIID)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-17

    ... accordance with FAR 4.605(a), agencies are required to have in place a process that ensures that each PIID... standardization of contract data beyond FPDS, thereby causing the potential for duplication of contract data... lack of specific policies and procedures necessary to ensure standardization of unique PIIDs identified...

  13. 7 CFR 1753.38 - Procurement procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... specifications and equipment requirements (required only for projects expected to exceed $500,000 or 25% of the... technology. (ii) The borrower shall review in detail all exceptions to the P&S. No exceptions will be... only for projects that are expected to exceed $500,000 or 25% of the loan, whichever is less), sealed...

  14. Application of a Taxonomical Structure for Classifying Goods Procured by the Federal Government

    DTIC Science & Technology

    1991-12-01

    between all pairs of objects. Also called a "tree" or "phenogram". "• UPGMA Clustering Method- (Un--weighted pair-group method using weighted averages...clustering arrangement, specifically, the unweighted pair-group method using arithmetic averages ( UPGMA ) (more commonly known as the 49 average linkage method

  15. 7 CFR 1753.38 - Procurement procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... specifications and equipment requirements (required only for projects expected to exceed $500,000 or 25% of the... technology. (ii) The borrower shall review in detail all exceptions to the P&S. No exceptions will be... only for projects that are expected to exceed $500,000 or 25% of the loan, whichever is less), sealed...

  16. 7 CFR 1753.38 - Procurement procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... specifications and equipment requirements (required only for projects expected to exceed $500,000 or 25% of the... technology. (ii) The borrower shall review in detail all exceptions to the P&S. No exceptions will be... only for projects that are expected to exceed $500,000 or 25% of the loan, whichever is less), sealed...

  17. 7 CFR 1753.38 - Procurement procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... specifications and equipment requirements (required only for projects expected to exceed $500,000 or 25% of the... technology. (ii) The borrower shall review in detail all exceptions to the P&S. No exceptions will be... only for projects that are expected to exceed $500,000 or 25% of the loan, whichever is less), sealed...

  18. Sandia National Laboratories: Working with Sandia: Procurement:

    Science.gov Websites

    Payrolls Before you can submit a timecard you must enter your employees. Please see the Contractor Job Aid link for that specific contract. Please refer to the Contractor Job Aid (MS Word)for further @sandia.gov. Contractor ES&H ES&H for Construction & Service Contracts 01065 Construction Standard

  19. Food Products Procurement, Receiving and Storage Guide.

    ERIC Educational Resources Information Center

    Kansas Association of School Business Officials, Haysville.

    This guide is intended as a resource document for the beginner in food services and food purchasing. The publication is divided topically by (1) purchasing procedures, (2) specifications and evaluation, (3) sources for purchasing food products, (4) storage of food products and inventory procedures, (5) type of food service management, and (6)…

  20. 20 CFR 627.420 - Procurement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    .... (1) For purposes of this section, the term procurement means the process which leads to any award of... shall maintain records sufficient to detail the significant history of a procurement. These records...

  1. General presentation including new structure

    NASA Astrophysics Data System (ADS)

    Soons, A.

    2002-12-01

    Electrical, electronic and electro-mechanical components play an essential role in the functional performance, quality, life cycle and costs of space systems. Their standardisation, product specification, development, evaluation, qualification and procurement must be based on a coherent and efficient approach, paying due attention to present and prospective European space policies and must be commensurate with user needs, market developments and technology trends. The European Space Components Coordination (ESCC) is established with the objective of harmonising the efforts concerning the various aspects of EEE space components by ESA. European national and international public space organisations, the component manufacturers and the user industries. The goal of the ESCC is to improve the availability of strategic EEE space components with the required performance and at affordable costs for institutional and commercial space programmes. It is the objective of ESCC to achieve this goal by harmonising the resources and development efforts for space components in the ESA Member States and by providing a single and unified system for the standardisation, product specification, evaluation, qualification and procurement of European EEE space components and for the certification of components and component manufacturers.

  2. A Review Of Innovative International Financing Mechanisms To Address Noncommunicable Diseases.

    PubMed

    Meghani, Ankita; Basu, Sanjay

    2015-09-01

    Noncommunicable diseases have become prevalent in low- and middle-income countries. A key question that remains unresolved is how to support the development of systems to prevent and treat noncommunicable disease through international financing mechanisms. We conducted a review of articles and grey literature published from 2000 through 2014 on innovative financing models proposed or used for other disease control efforts. We found that the greatest available evidence supported pooled funding models, where funding from multiple groups is combined for a specific investment, with such models previously deployed in vaccine and infectious disease funding areas. Robust evidence also supported the viability of international transactions taxes or levies placed on specific transactions to fund investments in drug procurement and supply, and of the front-loading of development aid through bond sales, particularly to stabilize funding and subsidize drug procurement. Far less compelling evidence was available to support diaspora bonds or debt reduction programs as mechanisms to aid low- and middle-income countries' health systems in financing noncommunicable disease prevention and care services. Project HOPE—The People-to-People Health Foundation, Inc.

  3. Status of the LCLS-II Accelerating Cavity Production

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daly, Ed; Marhauser, Frank; Fitzpatrick, Jarrod A.

    Cavity serial production for the LCLS-II 4 GeV CM SRF linac has started. A quantity of 266 accelerating cavities has been ordered from two industrial vendors. Jefferson Laboratory leads the cavity procurement activities for the project and has successfully transferred the Nitrogen-Doping process to the industrial partners in the initial phase, which is now being applied for the production cavities. We report on the results from vendor qualification and the status of the cavity production for LCLS-II.

  4. Phase Zero Operations for Contingency and Expeditionary Contracting-Keys to Fully Integrating Contracting into Operational Planning and Execution

    DTIC Science & Technology

    2010-08-02

    Cost and Price Analysis & Negotiations (5-2)—DAU CON 217 & CON 218 Certified; MN3318 Contingency Contracting (3-0)—DAU CON 234 Certified; and...MN3315 Advanced Contract Management (4-0)—DAU CON 214 & CON 215 Certified. CDR (Ret) Yoder has recently been published or cited in the following works...certified as the primary guide for all DAU CON 234 course deliveries. Contracting Out Government Procurement Functions: An Analysis (NPS-CM-07-105), E

  5. Navy MANTECH Fiscal Year 2003 Annual Report

    DTIC Science & Technology

    2004-03-01

    CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...at five Northrop Grumman Ship Systems ( NGSS ) suppliers Suppliers comprise up to 80% of the cost for the LPD 17. Phase I of this effort received...systems and a " lessons learned" overview. Procurement specialists will have knowledge and experience necessary to be a "smart buyer" of fiber optic

  6. Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2006-03-07

    PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service The...New Orleans and a third facility at Gulfport, MS, form Northrop Grumman’s Ship Systems ( NGSS ) division. The Navy has not procured any frigates since...the program, it had decided to award the contract for the next phase on a sole-source basis to Northrop Grumman’s Ship Systems ( NGSS ) division, which

  7. WEAVE an overview and status update

    NASA Astrophysics Data System (ADS)

    Bonifacio, P.; Dalton, G.; Trager, S.; Aguerri, A. L.; Carrasco, E.; Vallenari, A.; Abrams, D. C.; Middleton, K.; Sayède, F.

    2016-12-01

    The WHT Enhanced Area Velocity Explorer is a high multiplex, multi-object spectrograph that will equip the prime focus of the WHT 4.2m telescope. The instrument is currently in the construction phase and several components have already been procured. I will give a short overview of the instrument and of the project and its status. The French participation is done through CNRS - Institut National des Sciences de l'Univers and the technical activity is carried out, at this stage, at GEPI, Observatoire de Paris.

  8. Phase II - Procurement of State of the Art Research Equipment to Support Faculty Members with the RNA Therapeutics Institute, a component of the Advanced Therapeutics Cluster at the University of Massachusetts Medical School

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moore, Melissa

    2011-10-14

    This project supported the continued development of the RNA Therapeutics Institute at the UMass Medical School. This funding allows for the purchase of critical equipment that will enable faculty members to develop RNA technology in order to better understand the complexity that separates genome sequence from biological function, as well as to reduce the hyperactivity of harmful genes.

  9. Moving Equipment and Workers to Mine Construction Site at a Logistically Challenged Area

    NASA Astrophysics Data System (ADS)

    Tikasz, Laszlo; Biroscak, Dennis; Pentiah, Scheale Duvah; McCulloch, Robert I.

    Social sensitivity of habitants, minimal impact on the environment, low-grade infrastructure, high altitude, frequent rock slides combined with expectations for the timely moving of equipment and workers are some of the challenges emerging from the current construction of a mine. Starting with traditional planning, and experiencing issues in the early phase of the construction, a traffic simulator was requested by the Procurement Department in order to validate daily-weekly schedules and predict likely delays or blockages on the long-term.

  10. 41 CFR 101-26.501-3 - Consolidated purchase program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT..., purchased in the aggregate by group to the extent practical. These procurements are designed to obtain the...

  11. Antiretroviral drug expenditure, pricing and judicial demand: an analysis of federal procurement data in Brazil from 2004–2011

    PubMed Central

    2014-01-01

    Background Previous studies have described expenditures for antiretroviral (ARV) medicines in Brazil through 2005. While prior studies examined overall expenditures, they have not have analyzed drug procurement data in order to describe the role of court litigation on access and pricing. Methods ARV drug procurement from private sector sources for the years 2004–2011 was obtained through the general procurement database of the Brazilian Federal Government (SIASG). Procurement was measured in Defined Daily Doses (DDD) per 1000 persons-under-treatment per day. Expenditures and price per DDD were calculated and expressed in U.S. Dollars. Justifications for ARV purchases were examined in order to determine the relationship between health litigation and incorporation into Brazil’s national treatment guidelines. Results Drug procurement of ARVs from private sources underwent marked expansion in 2005, peaked in 2009, and stabilized to 2008 levels by 2011. Expenditures followed procurement curves. Medications which were procured for the first time after 2007 cost more than medicines which were introduced before 2007. Judicial actions initially resulted in purchases of newer medications for a select number of patients in Brazil but ultimately expanded availability to a larger population through incorporation into the national treatment guidelines. Conclusions Drug procurement and expenditures for ARVs in Brazil varied between 2004–2011. The procurement of some drugs from the private sector ceased after public manufacturers started producing them locally. Judicial demand has resulted in the incorporation of newer drugs into the national treatment guidelines. In order for the AIDS treatment program to remain sustainable, efforts should be pursued to reduce prices through generic drugs, price negotiation and other public health flexibilities such as compulsory licensing. PMID:24735589

  12. Antiretroviral drug expenditure, pricing and judicial demand: an analysis of federal procurement data in Brazil from 2004-2011.

    PubMed

    Luo, Jing; Oliveira, Maria A; Ramos, Mariana B C; Maia, Aurélio; Osorio-de-Castro, Claudia G S

    2014-04-16

    Previous studies have described expenditures for antiretroviral (ARV) medicines in Brazil through 2005. While prior studies examined overall expenditures, they have not have analyzed drug procurement data in order to describe the role of court litigation on access and pricing. ARV drug procurement from private sector sources for the years 2004-2011 was obtained through the general procurement database of the Brazilian Federal Government (SIASG). Procurement was measured in Defined Daily Doses (DDD) per 1000 persons-under-treatment per day. Expenditures and price per DDD were calculated and expressed in U.S. Dollars. Justifications for ARV purchases were examined in order to determine the relationship between health litigation and incorporation into Brazil's national treatment guidelines. Drug procurement of ARVs from private sources underwent marked expansion in 2005, peaked in 2009, and stabilized to 2008 levels by 2011. Expenditures followed procurement curves. Medications which were procured for the first time after 2007 cost more than medicines which were introduced before 2007. Judicial actions initially resulted in purchases of newer medications for a select number of patients in Brazil but ultimately expanded availability to a larger population through incorporation into the national treatment guidelines. Drug procurement and expenditures for ARVs in Brazil varied between 2004-2011. The procurement of some drugs from the private sector ceased after public manufacturers started producing them locally. Judicial demand has resulted in the incorporation of newer drugs into the national treatment guidelines. In order for the AIDS treatment program to remain sustainable, efforts should be pursued to reduce prices through generic drugs, price negotiation and other public health flexibilities such as compulsory licensing.

  13. Integrated Procurement Management System, Version II

    NASA Technical Reports Server (NTRS)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  14. Annual report: Purchasing and Materials Management Organization, Sandia National Laboratories, fiscal year 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zaeh, R.A.

    1993-04-01

    This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1992. Activities for both the New Mexico and California locations are included. Topics covered in this report include highlights for fiscal year 1992, personnel, procurements (small business procurements, disadvantaged business procurements, woman-owned business procurements, New Mexico commercial business procurements, Bay area commercial business procurements), commitments by states and foreign countries, and transportation activities. Also listed are the twenty-five commercial contractors receiving the largest dollar commitments, commercial contractors receiving commitments of $1,000 or more, integrated contractor and federal agency commitments of $1,000 ormore » more from Sandia National Laboratories/New Mexico and California, and transportation commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California.« less

  15. Lung Focused Resuscitation at a Specialized Donor Care Facility Improves Lung Procurement Rates.

    PubMed

    Chang, Stephanie H; Kreisel, Daniel; Marklin, Gary F; Cook, Lindsey; Hachem, Ramsey; Kozower, Benjamin D; Balsara, Keki R; Bell, Jennifer M; Frederiksen, Christine; Meyers, Bryan F; Patterson, G Alexander; Puri, Varun

    2018-05-01

    Lung procurement for transplantation occurs in approximately 20% of brain dead donors and is a major impediment to wider application of lung transplantation. We investigated the effect of lung protective management at a specialized donor care facility on lung procurement rates from brain dead donors. Our local organ procurement organization instituted a protocol of lung protective management at a freestanding specialized donor care facility in 2008. Brain dead donors from 2001 to 2007 (early period) were compared with those from 2009 to 2016 (current period) for lung procurement rates and other solid-organ procurement rates using a prospectively maintained database. An overall increase occurred in the number of brain dead donors during the study period (early group, 791; late group, 1,333; p < 0.0001). The lung procurement rate (lung donors/all brain dead donors) improved markedly after the introduction of lung protective management (early group, 157 of 791 [19.8%]; current group, 452 of 1,333 [33.9%]; p < 0.0001). The overall organ procurement rate (total number of organs procured/donor) also increased during the study period (early group, 3.5 organs/donor; current group, 3.8 organs/donor; p = 0.006). Lung protective management in brain dead donors at a specialized donor care facility is associated with higher lung utilization rates compared with conventional management. This strategy does not adversely affect the utilization of other organs in a multiorgan donor. Copyright © 2018 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  16. Understanding public drug procurement in India: a comparative qualitative study of five Indian states

    PubMed Central

    Singh, Prabal Vikram; Tatambhotla, Anand; Kalvakuntla, Rohini; Chokshi, Maulik

    2013-01-01

    Objective To perform an initial qualitative comparison of the different procurement models in India to frame questions for future research in this area; to capture the finer differences between the state models through 53 process and price parameters to determine their functional efficiencies. Design Qualitative analysis is performed for the study. Five states: Tamil Nadu, Kerala, Odisha, Punjab and Maharashtra were chosen to ensure heterogeneity in a number of factors such as procurement type (centralised, decentralised or mixed); autonomy of the procurement organisation; state of public health infrastructure; geography and availability of data through Right to Information Act (RTI). Data on procurement processes were collected through key informant analysis by way of semistructured interviews with leadership teams of procuring organisations. These process data were validated through interviews with field staff (stakeholders of district hospitals, taluk hospitals, community health centres and primary health centres) in each state. A total of 30 actors were interviewed in all five states. The data collected are analysed against 52 process and price parameters to determine the functional efficiency of the model. Results The analysis indicated that autonomous procurement organisations were more efficient in relation to payments to suppliers, had relatively lower drug procurement prices and managed their inventory more scientifically. Conclusions The authors highlight critical success factors that significantly influence the outcome of any procurement model. In a way, this study raises more questions and seeks the need for further research in this arena to aid policy makers. PMID:23388196

  17. Medical technology procurement in Europe: a cross-country comparison of current practice and policy.

    PubMed

    Sorenson, Corinna; Kanavos, Panos

    2011-04-01

    Procurement policy can influence the diffusion of medical devices into national health systems, but limited comparative evidence exists on how countries procure such technologies. This paper discusses the procurement of select medical devices across five countries (England, France, Germany, Italy, and Spain) based on a review of published and grey literature and policy documents, as well as expert interviews. All countries have introduced various regulatory or policy measures that implicitly or explicitly influence device procurement, from lists of devices for purchase to changes in financing mechanisms. There has also been movement toward more centralized procurement with the introduction of purchasing groups or consortiums, notably in England, France, Germany, and Italy. While a number of stakeholder groups are involved in purchasing activities, a greater, more formalized role for physicians and governments is needed to ensure that technologies procured best meet patient needs and align with national health care priorities and other sectoral objectives. A general theme across all national procurement systems was a focus on cost-containment, but like other areas of technology policy (e.g., coverage), basing purchasing decisions on a broader range of criteria, such as quality and health outcomes, might better allow governments to achieve value for money and support patient access to beneficial innovations. More research is needed, however, to substantiate the role and influence of procurement on balancing the adoption and affordability of medical technologies. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.

  18. Understanding public drug procurement in India: a comparative qualitative study of five Indian states.

    PubMed

    Singh, Prabal Vikram; Tatambhotla, Anand; Kalvakuntla, Rohini; Chokshi, Maulik

    2013-01-01

    To perform an initial qualitative comparison of the different procurement models in India to frame questions for future research in this area; to capture the finer differences between the state models through 53 process and price parameters to determine their functional efficiencies. Qualitative analysis is performed for the study. Five states: Tamil Nadu, Kerala, Odisha, Punjab and Maharashtra were chosen to ensure heterogeneity in a number of factors such as procurement type (centralised, decentralised or mixed); autonomy of the procurement organisation; state of public health infrastructure; geography and availability of data through Right to Information Act (RTI). Data on procurement processes were collected through key informant analysis by way of semistructured interviews with leadership teams of procuring organisations. These process data were validated through interviews with field staff (stakeholders of district hospitals, taluk hospitals, community health centres and primary health centres) in each state. A total of 30 actors were interviewed in all five states. The data collected are analysed against 52 process and price parameters to determine the functional efficiency of the model. The analysis indicated that autonomous procurement organisations were more efficient in relation to payments to suppliers, had relatively lower drug procurement prices and managed their inventory more scientifically. The authors highlight critical success factors that significantly influence the outcome of any procurement model. In a way, this study raises more questions and seeks the need for further research in this arena to aid policy makers.

  19. Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress

    DTIC Science & Technology

    2016-03-23

    Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress Ronald O’Rourke Specialist...Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition Congressional Research Service Summary Multiyear procurement (MYP) and... block buy contracting (BBC) are special contracting mechanisms that Congress permits the Department of Defense (DOD) to use for a limited number of

  20. Federal procurement metrication appropriateness and methods

    NASA Astrophysics Data System (ADS)

    Coella, M. A.

    1982-09-01

    This study was designed to provide the USMB with a clearer understanding of the basic relationships between the Federal procurement process and private sector suppliers. This was done to gain an understanding of the ways in which Federal procurement can encourage and accommodate initiatives of the private sector and to ensure that the effects of conversion on the Federal and private sectors are understood prior to implementation of procurement decisions and actions.

  1. Recommendations of the Commission on Government Procurement: A Final Assessment

    DTIC Science & Technology

    1979-05-31

    Assessment TECHNICAi; LIBRARY Important structural changes are now in place on procurement reforms first proposed in 1972, but the program is far...COMPTROLLER GENERAL’S REPORT TO THE CONGRESS RECOMMENDATIONS OF THE COMMISSION ON GOVERNMENT PROCUREMENT: A FINAL ASSESSMENT DIGEST As Federal...legislation and —the Office of Federal Procurement Policy (OFPP) to lead in making needed changes. OVERALL ASSESSMENT Success of the reform program is still

  2. Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress

    DTIC Science & Technology

    2016-07-25

    Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress Ronald O’Rourke Specialist...Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition Congressional Research Service Summary Multiyear procurement (MYP) and... block buy contracting (BBC) are special contracting mechanisms that Congress permits the Department of Defense (DOD) to use for a limited number of

  3. GPP Webinar: Solar Procurement Templates and Tools for Higher Education

    EPA Pesticide Factsheets

    Green Power Partnership webinar on solar procurement for Higher Education which features various tools and templates that schools can use to shape and manage the solar procurement process to a successful outcome.

  4. Pooling procurement in the Belgian hospital sector.

    PubMed

    Hebert, Guy

    2011-01-01

    The Belgian hospital sector is following the example of a number of other European countries and for more than ten years now, has been striving to pool its medical supplies and equipment purchases in a bid to reduce costs. The various experiments of which we are aware come under both opportunist purchases and initiatives which are designed to encourage local-regional contracts. These attempts have now all come to nothing or are struggling in the absence of a structured and professional approach. In 2005, the Saint Luc University Clinic in Brussels decided to set up a high-performance purchasing department, the aim being to centre its initiatives around TCO or Total Cost of Ownership. Following an analysis of the various experiments into pooling procurement in hospitals in Europe, the Saint Luc University Clinic decided on a central procurement agency model, in accordance with new legislation on public procurement. This article seeks to highlight the prerequisites which are vital for a procurement pooling initiative, without underestimating the risks and limitations of implementing such a change in procurement practices. The Mercure central procurement agency is now the largest interhospital purchasing structure in Belgium.

  5. Energy from biomass and wastes V; Proceedings of the Fifth Symposium, Lake Buena Vista, FL, January 26-30, 1981

    NASA Astrophysics Data System (ADS)

    Papers are presented in the areas of biomass production and procurement, biomass and waste combustion, gasification processes, liquefaction processes, environmental effects and government programs. Specific topics include a water hyacinth wastewater treatment system with biomass production, the procurement of wood as an industrial fuel, the cofiring of densified refuse-derived fuel and coal, the net energy production in anaerobic digestion, photosynthetic hydrogen production, the steam gasification of manure in a fluidized bed, and biomass hydroconversion to synthetic fuels. Attention is also given to the economics of deriving alcohol for power applications from grain, ethanol fermentation in a yeast-immobilized column fermenter, a solar-fired biomass flash pyrolysis reactor, particulate emissions from controlled-air modular incinerators, and the DOE program for energy recovery from urban wastes.

  6. Product Quality Assurance for Off-Grid Lighting in Africa

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    World Bank; Mills, Evan; Mills, Evan

    Although the emergence of markets for high efficiency off-grid lighting technologies holds promise, realizing the potential of this opportunity on a long-term, sustainable basis requires careful attention to issues of product quality, consumer protection, and the potential for significant 'market spoiling', in anticipation of increases of sales of low cost, low performance off-grid lighting products. The goal of the Lighting Africa quality assurance workshop was to articulate strategies to mitigate the dangers of market spoiling and to explore ways to protect consumers from misleading advertising for sales of inferior, off-grid lighting products in the context of Lighting Africa's overarching objectivemore » to support the industry in developing a robust off-grid lighting market in Africa. The workshop resulted in the identification of two strategic approaches for meeting Lighting Africa quality assurance programmatic needs. The first strategy is intended to meet a short-term programmatic need for quality associated with requests for lighting products by bulk procurement agents, such as in a World Bank-financed project. The development of procurement specifications and test procedures that could be used in a quality/usability screening method in order to provide guidance for forthcoming large volume purchases emerged as the best solution to meet this need. Such approaches are used in World Bank-financed solar home systems (SHSs) projects in Bangladesh, Sri Lanka, and China, among others. However, unlike the SHSs which have multiple balance-of-system (BOS) components warranting the need for an array of specifications for individual components, stand alone lighting systems require specifications that are amenable to individual light points. To test this approach, Lighting Africa elected to use the technical specifications issued by the Photovoltaic Global Approval Program for solar lanterns that use CFL bulbs (PVRS11A) as the basis of qualifying such products. A contract has been competitively awarded to the Global Approval Program for Photovoltaics (PV GAP) under the Lighting Africa Program to select and test ten solar lantern product models. Lantern selection will be determined based on a number of criteria, among them, the ability to provide a daily duty cycle of at least 3 hours of light, the number of days of autonomy of battery, the volume of sales (especially in Africa), and whether or not the manufacturing facility is ISO 9000 certified. Those that are confirmed as meeting the specifications may be eligible to receive a PVGAP quality seal. The work is being carried out in partnership with the Photovoltaic and Wind Quality Test Center in Beijing, China and TUV Rhineland in Koeln, Germany. As off-grid LED-based stand-alone lighting products is in a nascent stage of development compared to CFL-based lanterns, Lighting Africa will support the development of a 'Quality Screening' approach to selecting LED lighting, in order not to delay consumers benefiting from such advances. The screening methodology could be used by procurement agencies to qualify LED lighting products for bulk or programmatic procurements. The main elements of this work comprises of developing a procurement specification and test procedure for undertaking a 'quick' quality/usability screening to be used for procuring LED lights and to test up to 30 LED-based lights to screen products that meet the requirement. The second strategy is intended to meet a longer-term need associated with creating a self-sustaining product quality assurance program that will effectively protect the African consumer, prevent significant market spoiling, adapt with expected technological advancements over the long-term--in other words, give consumers the ability to detect quality products and the information needed to find products that meet their specific needs from among the myriad of lighting products that become available commercially. Workshop discussions and the discussions evolving from the workshop led the Lighting Africa team to opt for an approach similar to that of the 'Fair Trade' model, involving the creation of a set of voluntary criteria which companies can elect to subscribe to in order to receive a product evaluation/certification. This solution was proposed as it has the widest capacity to incorporate the largest number of recommendations from the workshop sessions. This code of conduct will be made available for companies to comment on later in 2008. These workshop proceedings provide an overview of workshop discussions and a summary of the key points identified around various workshop topic areas, contributing to the two strategy approach Lighting Africa will take as it moves forward with developing its quality assurance program.« less

  7. Extraction of ECG signal with adaptive filter for hearth abnormalities detection

    NASA Astrophysics Data System (ADS)

    Turnip, Mardi; Saragih, Rijois. I. E.; Dharma, Abdi; Esti Kusumandari, Dwi; Turnip, Arjon; Sitanggang, Delima; Aisyah, Siti

    2018-04-01

    This paper demonstrates an adaptive filter method for extraction ofelectrocardiogram (ECG) feature in hearth abnormalities detection. In particular, electrocardiogram (ECG) is a recording of the heart's electrical activity by capturing a tracingof cardiac electrical impulse as it moves from the atrium to the ventricles. The applied algorithm is to evaluate and analyze ECG signals for abnormalities detection based on P, Q, R and S peaks. In the first phase, the real-time ECG data is acquired and pre-processed. In the second phase, the procured ECG signal is subjected to feature extraction process. The extracted features detect abnormal peaks present in the waveform. Thus the normal and abnormal ECG signal could be differentiated based on the features extracted.

  8. Binding Procurement

    NASA Technical Reports Server (NTRS)

    Rao, Gopalakrishna M.; Vaidyanathan, Hari

    2007-01-01

    This viewgraph presentation reviews the use of the binding procurement process in purchasing Aerospace Flight Battery Systems. NASA Engineering and Safety Center (NESC) requested NASA Aerospace Flight Battery Systems Working Group to develop a set of guideline requirements document for Binding Procurement Contracts.

  9. 48 CFR 701.301 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... guidelines for procurement to the overseas Missions. Administrative and local support services include the... uniform procurement policies, procedures, and standards; (2) Providing assistance to the contracting activities as appropriate; (3) Keeping the Administrator and Executive Staff fully informed on procurement...

  10. Portable device technology in organ donation: new "app" for procurement coordinators.

    PubMed

    Cavallin, M; Bertini, P; Lopane, P; Guarracino, F

    2014-09-01

    Portable devices are commonly used at bedside in everyday practice. Transplant procurement coordinators routinely have to deal with protocols and flow charts and need to assess the donor condition several times. In our experience, a great part of the organ procurement management work is provided by nurses "on call." We developed an application for iOS devices to facilitate their approach to relatives and procedures for organ donation. The application, which includes algorithms, tutorials, and simple calculators, has been designed by transplant procurement coordinators to speed up the process of organ donation and at the same time to be as accurate as possible for the process. It can be used alongside all of the procedures for procurement in the emergency room, intensive care unit, operating room, and morgue in both brainstem-dead and cadaver organ donors. The application could be effective in organ procurement management for everyday practice. Copyright © 2014 Elsevier Inc. All rights reserved.

  11. Cellular Therapies Clinical Research Roadmap: Lessons learned on how to move a cellular therapy into a clinical trial

    PubMed Central

    Ouseph, Stacy; Tappitake, Darah; Armant, Myriam; Wesselschmidt, Robin; Derecho, Ivy; Draxler, Rebecca; Wood, Deborah; Centanni, John M.

    2014-01-01

    A clinical research roadmap has been developed as a resource for researchers to identify critical areas and potential pitfalls when transitioning a cellular therapy product from the research laboratory, via and Investigational New Drug (IND) application, into early phase clinical trials. The roadmap describes four key areas; basic and preclinical research, resource development, translational research and good manufacturing practice (GMP), and IND assembly and submission. Basic and preclinical research identifies a new therapeutic concept and demonstrates its potential value using a model of the relevant disease. During resource development the appropriate specialists and the required expertise to bring this product into the clinic are identified (e.g., researchers, regulatory specialists, GMP manufacturing staff, clinicians, and clinical trials staff, etc.). Additionally, the funds required to achieve this goal (or a plan to procure them) are identified. In the next phase the plan to translate the research product into a clinical grade therapeutic is developed. Finally regulatory approval to start the trial must be obtained. In the United States this is done by filing an IND application with the Food and Drug Administration. The NHLBI-funded Production Assistance for Cellular Therapies (PACT) program has facilitated the transition of a variety of cellular therapy products from the laboratory into Phase1/2 trials. The five PACT facilities have assisted investigators by performing translational studies and GMP manufacturing to ensure that cellular products met release specifications and were manufactured safely, reproducibly, and at the appropriate scale. The roadmap resulting from this experience is the focus of this article. PMID:25484311

  12. Scientific, legal, and ethical challenges of end-of-life organ procurement in emergency medicine.

    PubMed

    Rady, Mohamed Y; Verheijde, Joseph L; McGregor, Joan L

    2010-09-01

    We review (1) scientific evidence questioning the validity of declaring death and procuring organs in heart-beating (i.e., neurological standard of death) and non-heart-beating (i.e., circulatory-respiratory standard of death) donation; (2) consequences of collaborative programs realigning hospital policies to maximize access of procurement coordinators to critically and terminally ill patients as potential donors on arrival in emergency departments; and (3) ethical and legal ramifications of current practices of organ procurement on patients and their families. Relevant publications in peer-reviewed journals and government websites. Scientific evidence undermines the biological criteria of death that underpin the definition of death in heart-beating (i.e., neurological standard) and non-heart-beating (i.e., circulatory-respiratory standard) donation. Philosophical reinterpretation of the neurological and circulatory-respiratory standards in the death statute, to avoid the appearance of organ procurement as an active life-ending intervention, lacks public and medical consensus. Collaborative programs bundle procurement coordinators together with hospital staff for a team-huddle and implement a quality improvement tool for a Rapid Assessment of Hospital Procurement Barriers in Donation. Procurement coordinators have access to critically ill patients during the course of medical treatment with no donation consent and with family or surrogates unaware of their roles. How these programs affect the medical care of these patients has not been studied. Policies enforcing end-of-life organ procurement can have unintended consequences: (1) erosion of care in the patient's best interests, (2) lack of transparency, and (3) ethical and legal ramifications of flawed standards of declaring death. Copyright 2010 Elsevier Ireland Ltd. All rights reserved.

  13. Joint Service Aircrew Mask (JSAM) - Tactical Aircraft (TA) Modified A/P22P-14A (V)3: Noise Attenuation and Speech Intelligibility Performance

    DTIC Science & Technology

    2015-07-01

    PAGE Using Government drawings, specifications, or other data included in this document for any purpose other than Government procurement does...not in any way obligate the U.S. Government. The fact that the Government formulated or supplied the drawings, specifications, or other data does...this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data

  14. The Alaska experience

    NASA Technical Reports Server (NTRS)

    Mutter, D. L.

    1981-01-01

    The management responsibilities of the Alaska Department of Natural Resources are summarized and the establishment of a geoprocessor system is described. Specific capabilities were defined based on surveys of potential users and pre-existing systems. The procurement process, the initially purchased equipment, and system upgrading are described. Cost, installation and maintenance, site location, training, and staffing of the system are examined.

  15. 13 CFR 125.19 - When may a contracting officer set-aside a procurement for SDVO SBCs?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... be made at fair market prices. This requirement does not preclude a contracting officer from making... delivery and award will be made at fair market prices. However, after conducting market research, the... rationale used to support the specific set-aside, including the type and extent of market research conducted...

  16. The Alaska experience

    NASA Astrophysics Data System (ADS)

    Mutter, D. L.

    1981-09-01

    The management responsibilities of the Alaska Department of Natural Resources are summarized and the establishment of a geoprocessor system is described. Specific capabilities were defined based on surveys of potential users and pre-existing systems. The procurement process, the initially purchased equipment, and system upgrading are described. Cost, installation and maintenance, site location, training, and staffing of the system are examined.

  17. Characterization of ZrO2-Y2O3 thermal spray powder systems

    NASA Technical Reports Server (NTRS)

    Mantkowski, Thomas E.; Rigney, David V.; Froning, Marc J.; Jayaraman, N.

    1985-01-01

    The overall objective is to establish the interrelation between the raw material in the coating process and the performance of the coating deposit. It is anticipated that these interrelations will help establish more precise specifications for the procurement of the raw materials. Some of the preliminary results of the program are presented.

  18. Building Social Infrastructure through Public-Private Partnerships: The Case of Student Housing in Public Higher Education

    ERIC Educational Resources Information Center

    Cole, Bruce Kevin

    2012-01-01

    Evaluations of Public-Private Partnership arrangements as alternatives to traditional government procurement methods for the delivery of public infrastructure projects have been anecdotal at best. This paper proposes a framework to evaluate a public university's infrastructure asset management performance and a specific measure based on a new…

  19. Primary utilization of birch

    Treesearch

    Henry W. Saunders

    1969-01-01

    From an industry point-of-view, procurement of raw material and primary manufacture present problems today and challenges for tomorrow. So that you may become more familiar with the white birch industry and more specifically with Saunders Brothers, I will briefly explain some of the products we manufacture and some of the methods we use to make them. In some ways, we...

  20. Procurement of construction services: a case study on bidding competition in Singapore public sector contracts

    NASA Astrophysics Data System (ADS)

    Oo, B. L.; Yan, Y.

    2018-04-01

    There are many variables that public clients need to consider in their bidding procedure to enhance efficiency in their procurement for construction services. This paper focusses on the competitive bidding process for public sector procurement of construction services in Singapore. A distinctive feature of the Singapore government competitive bidding process is that full bidding feedback information is released to all competing bidders (and public). The specific objectives are: (i) to examine the degree of competition in the construction markets; and (ii) to examine the bidding performance of competing bidders. Based on a collection of bidding data for a 15-month period, the results show the market environment of the Singapore public sector construction contracting is highly competitive with long bidder lists. In selection of contractors, only 50% of the contracts were awarded to lowest bidders. The results also show that the competing contractors can be broadly classified into three groups based on their bidding performance in terms of number of bidding attempts, bidding success rate and bidding competitiveness. These results provide a useful insight into the bidding competition in the Singapore public sector construction contracting, especially to new market entrants and foreign contractors who want to bid for jobs in Singapore.

Top